Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-082 STATE OF ALASKA
A OIL AND GAS CONSERVATION COMMON
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other:Scale Inhibitor Treatment D
2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development 0 Exploratory Cl 204-082
3.Address: Stratigraphic❑ Service ❑ 6.API Number:
P.O. Box 100360, Anchorage, AK 99510 50-103-20493-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL 380075, 387207 CRU CD2-31
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s):
None Colville River Field/Alpine Oil Pool
11. Present Well Condition Summary:
Total Depth measured 18131 feet Plugs measured None feet
true vertical 7311 feet Junk measured None feet
Effective Depth measured 18131 feet Packer measured 12629 feet
true vertical 7311 feet true vertical 7071 feet
Casing Length Size MD TVD SCAl��tt�t1 'ER 2 2017 Collapse
Structural ! i1l�aBB��CC��d i1 [ CC�a 7 1
Conductor 81' 16" 114' 114'
Surface 3265' 9.625" 3302' 2364'
Intermediate
Production 13564' 7" 13598' 7340' RECEIVED
Liner 5490' 4.5" 18119' 7312'
OCT 21 2016
Perforation depth Measured Depth: Slotted Liner Completion, 12629'- 18119'
True Vertical Depth: 7071'-7312' AOGCC
Tubing(size,grade,measured and true vertical depth) 4.5"x 3.5", L-80, 12679' MD, 7093'TVD
Packers and SSSV(type,measured and true vertical depth) Packer: Baker ZXP Liner Top Packer, 12629' MD, 7071'TVD
SSSV: Camco TRM-4E SCSSV, 2307' MD, 1878'TVD
12.Stimulation or cement squeeze summary:
Intervals treated(measured): 13598'- 18131' MD
Treatment descriptions including volumes used and final pressure: Please see attached summary
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 399 166 772 1186 213
Subsequent to operation: 404 99 795 1168 207
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations D Exploratory❑ Development0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil LI Gas ❑ WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑ _
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Anu Sood Email Anu.Sood@cop.com
Printed Name Anu Sood Title Production Engineer
Signature .......4:10' Phone 263-4802 Date t(4,24)6
V t- bo/zf//L
^Of Y/i6 RBDMS 1,v OCT 2 4 2016
Form 10-404 Revised 5/2015 Submit Original Only
• !
CD2-31 Scale Inhibition Treatment
9/22/16
Hybrid Scale Inhibitor Squeeze Job pumped from 07:45 to 17:15 hrs on 9/22/16.
LRS= Little Red Services
- Initial pressure TBG/IA/OA=801/1011/852
- LRS pumped 165 bbls Diesel/WAW5206/M209 preflush at 1-2.5 bpm,TBG/IA/OA= 2/1031/814
- LRS pumped 165 bbls Seawater/SCW3001 scale inhibitor main treatment at 2.5 bpm,TBG/IA/OA
= 6/1002/771
- LRS pumped 1781 bbls dead crude overflush at 3.5 -4 bpm,TBG/IA/OA=0/986/757
Interval treated (MD): 13598'—18131'
y. ,; WNS • CD2-31
ConocoP Ii lips " Well Attributes Max Angle&MD TD
Alaska,Inc. "� Wellbore API/UWI Field Name Well Status Incl(-) MD(ftKB) Act Btm(RKB)
canocaafemp: - 501032049300 ALPINE PROD 94.22 13,885.24 18,131.0
Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date
••• Well C0009.-CD291,4/11120137:16'02AM SSSV:TRDP Last WO: 44.05 7/2/2004
Schematic-Actual Annotation Depth(ROB) End Date Annotation Last Mod...End Date
Last Tag: Rev Reason:WELL REVIEW osborl 4/11/2013
Casing Strings
5_ / Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt..String...String Top Thrd
HANGER,33 A CONDUCTOR 16 15.062 33.0 114.0 114.0 62.50 H-40 WELDED
R ` ' Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt..String...String Top Thrd
SURFACE 95/8 8.92136.7 3,301.9 2,363.7 36.00 J-55 BTC
• '�£ Cuing Description String 0... String ID.._Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd
PRODUCTION 7 6.276 34.8 13,598.4 7,339.5 26.00 L-80 BTCM
- Casing Description String 0... String ID...Top)RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd
'' ..! LINER 41/2 3.958 12,628.5 18,119.0 7,311.6 12.60 L-80 IBTM
IF
CONDUCTOR. Liner Details
33-714 Top Depth
(TVD) Top Incl Nome...
SAFETY VLV, Top(RKB) (RKB) (°) Item Description Comment ID lin)
2,307 Cle7:
111 12,628.5 7,071.4 64.48 PACKER BAKER ZXP LINER TOP PACKER 4.940
12,647.5 7,079.3 64.94 HANGER BAKER FLEX LOCK LINER HANGER 4.853
12,659.3 7,084.3 65.23 SBE BAKER SEAL BORE EXTENSION 4.750
SURFACE ,e Tubing Strings _
37-3'302 Tubing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd
GAS LIFT, TUBING 4.5x3.5" I 3 1/2 2.992 32.6 12,678.5 7,092.5 9.30 L-80 EUE-MOD
5.384ii Completion Details
Top Depth
(TVD) Top Incl Nome...
Top(RKB) (RKB) (°) Item Description Comment ID(In)
GAS LIFT, 1- 32.6 32.6 0.50 HANGER FMC4.5"TUBING HANGER 4.500
9,909 4
r 84.4 84.4 0.39 XO Reducing CROSSOVER 4.5 x 3.5" 3.500
[ -11 2,307.1 1,877.9 60.45 SAFETY VLV CAMCO TRM-4E SCSSV 2.812
12,518.2 7,020.2 61.80 SLEEVE-C BAKER CMPA SLIDING SLEEVE w/2.81"X PROFILE;CLOSED 2.812
GAS LIFT, 7/6/2004
12,430
MI12,596.0 7,057.3 63.69 NIPPLE HES XN NIPPLE w/NO GO 2.75"PROFILE 2.750
12,634.6 7,074.0 64.63 LOCATOR LOCATOR SUB 3.000
SLEEVE-c,$518 12,635.9 7,074.5 64.66 SEAL ASSY BAKER PBR 80/40 SEAL ASSEMBLY 3.000
AL
IA Perforations&Slots
NIPPLE,12,596 ilIC. Shot
ir Top(TVD) Btm(TVD) Dens
I j ... q Top(RKB)Btm(RKB) (RKB) (RKB) Zone Date Oh.. Type Comment
LOCATOR, BE 13,811.0 18,073.0 7,351.5 7,312.0 ALPA,CD2-31 7/1/2004 6.0 PERFP Slotted Liner,1 Perf Pup joint every 4
.835
i-
S
SEAL ASSY, joints of blank,w/eight 1/2"holes
12.636 '' 1 Stimulations&Treatments
Bottom
Min Top Max Btm Top Depth Depth
Depth Depth (TVD) (TVD)
(ftKB) (RKB) (RKB) IRKS) Typo Date Comment
13,811.0 18,073.0 7,351.5 7,312.0 FRAC 3/19/2007
Notes:General&Safety
End Date Annotation
PRODUCTION, A ' 7/1/2004 NOTE:TREE:FMC 4-1/16"5K-TREE CAP CONNECTION: 7"OTIS
35-13698 2/1/2011 NOTE:View Schematic w/Alaska Schematic9.0
T e
?
I b .
i
PERFP,
13,811-18,073
FRAC,13,811 - av 7..3
I
Mandrel Details
Top Depth Top Port
I- 1 5... (TVD) Incl OD Valve Latch Size TRO Run
N...Top(RKB) (RKB) (') Make Model (In) Sere Type Type (in) (psi) Run Date Com...
1 5,383.9 3,399.5 59.05vCAMCO KBUG 1 GAS LIFT DMY BK-5 0.000 0.0 7/1/2004
=
2 9,909.0 5,697.8 58.77 CAMCO KBUG 1 GAS LIFT DMY BK-5 0.000 0.0 3/162007
3 12,430.2 6,981.6 62.11 CAMCO KBUG 1 GAS LIFT OV BK-5 0.250 0.0 3212007 -
LINER,
12,629-18,119
TD(CD2-31),� :J I.
18,131
_ e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ () Id- 0 13 ~ Well History File Identifier
Organizing (done)
o Two-sided "' 11111111 ""1111
o Rescan Needed 111111111111111I111
RESCAN
~Ior Items:
o Greyscale Items:
DIGITAL DATA
~kettes, No. t!-
O Other, NofType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
BY: ~
Date cg ~ cdo
Date <ö ~ vb
o Other::
Project Proofing
BY: ~
151 lL11-P
11111111111I11 11111
151 mp
BY:
.:3 x 30 =.!1..!?-- + :J. 0 = TOTAL PAGES--1lD
(Count does not include cover sheet) D
Date: 151 IT
1111111111111/11111
Scanning Preparation
Production Scanning
Stage 1 Page Count from Scanned File: lU- (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ YES
BY: c:Yaria ) Date: 1) / I Lf I 00
Stage 1 If NO in stage 1 page(s) discrepancies were found: YES
NO
151 01 P
NO
BY:
Maria
Date:
151
11111111111I1111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11111111111I 111111I
10/6/2005 Well History File Cover Page.doc
STATE OF ALASKA
ALAS~IL AND GAS CONSERVATION COMMI~N
REPORT OF SUNDRY WELL OPERATIONS
1. OperationsPertormed: Abandon Re airwell ~~iea°y~ s ~~~~ {'~;~s• ~Gf>liltlS~iOr
p Rug Perforations ~'°' Stimulate ~' Ofhe~ ~`"= `
After Casing '"' FUII Tubing ~°" Perforate New Pool "" Waiver r Time Extension ` ,~"-
Change Approved Program """ Operat. Shutdow n Perforate ~ Re-enter uspended Well ~""
2. Operator Name: 4. Current Well Status: .Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development r Exploratory ""` 204-082
3. Address:
Stratigraphic ~ Service API Number:
P. O. Box 100360, Anchora e, Alaska 99510 50-103-20493-00
7. Property Designation: 8. Well Name and umber:
~
ADL 380075, 387207, ASRCNPR1 CD2-31
. Field/Pool(s):
Colville River Field /Alpine Oil Pool
10. Present Well Condition Summary:
Total Depth measured ~ 18131 feet Plugs (measured) None
true vertical ~ 7311 feet .sunk (measured) None
Effective Depth measured 18131' feet Packer (measured) 12629
true vertical 7311' feet (true vertucal) 7072
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 109 16 109 109'
SURFACE 3302 9.625 3302 2364'
PRODUCTION 13598 7 13598 7339'
LINER 5441 4.5 18119 7311'
'
'
'
Perforation depth: Measured depth: 13811 -14850
, 15245
-18073
True Vertical Depth: 7349'-7336', 7325'-7312'
Tubing (size, grade, MD, and TVD) 3.5, L-80, 12628 MD, 7071 TVD
Packers &SSSV (type, MD, and TVD) PACKER - ZXP LINER TOP PACKER @ 12629 MD and 7072 TVD
TRDP - CAMCO TRM-4E SSSV @ 2307 MD and 1878 TVD
11. Stimulation or cement squeeze summary:
Intervals treated (measured): 13811'-14850', 15245'-18073'
Treatment descriptions including volumes used and final pressure: 131 bbl hybrid SC81e
12. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 945 1746 123 -- 289
Subsequent to operation 1136 206 1991 -- 269
13. Attachments .Well Class after proposed work:
Copies of Logs and Surveys run Exploratory Development Service
Well Status after work: Oil I/', Gas WDSPL
Daily Report of Well Operations XX
GSTOR '"` WAG ~""" GASINJ ~ WINJ SPLUG
16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
none
contact Tim Schneider
Printed Name Tim Schne' er _ Title Alpine Production Engineer
Signature ) Phone: 265-6859 Date
~D
RBDMS JAN i 12010 G~'~ ///lam `~' ~~`'~~'
Form 10-404 Revised 7/2009 ~ Submit Original Only
L~
CD2-31: 1/2/10:
Pumped a 131 bbl Hybrid Scale squeeze treatment containing 825 gallons SCW-3001 WC SI. An 3 bbl crude pre &
post flushed each stage with 10% WAW5206 (26 gallons/stage). Pumped squeeze in 7 stages diverted withl.l SG
bio-balls. Displaced with 306 bbls crude. Treating pressure started at 700 psi dropping to a vacuum at the end of
stage 1. SI for 12 hours.
TUBING
(80-12628,
OD:3.500,
ID:2.992)
SURFACE
(0-3302,
OD:9.625,
Wf:36.00)
PRODUCTION
(0-13598,
OD:7.000,
Wt26.00)
SLEEVE-C --
(12518-12519,
OD:5.323)
PUP
(12597-12635,
OD:3.500)
PACKER
(12629-12630,
OD:6.540)
SEAL
(12635-12636,
OD:4.000)
SBE
(12659-12660,
OD:6.250)
FRAC
(13811-18073)
Perf
(13811-14850)
Perf
(15245-18073)
ALPINE CD2-31
:7
•
CD2-31 Details
~-~~.~®~
-~
~~ ~. ~ ~ ~r
~~~NNE®APR 2 9 2008
•
~Ot1~C~ h!~'~ ~ Casing Detail
9 5/8 ` Surface Casin
Well: CD2-31
Date: 6/7/2004
Jt Number Num of Jts COIVIPLETE DESCRIPTION OF EQUIPMENT RUN
DEPTH
LENGTH TOPS
Doyon 19 RKB to Landing Ring 36.70
FMC Gen V Hanger 2.19 36.70
Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg 3175.15 38.89
Davis Lynch Float Coilar 1.48 3214.04
Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 84.11 3215.52
Ray Oil Tools "Silver Bullet" Float Shoe 2.30 3299.63
3301.93
TD 12 1/4" Surface Hole 3312.00
RUN TOTAL 45 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - #12 (One stop ring on Jt #2)
and over collars on jts# 14, 16, 18, 20, 22, 24, 26, 28, 30,
32, 34, 36, 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58, 60, 62
64, 64, 66, 613,70,72,74,76,78
I (86 joints in the pipe shed. Run 79 joints -7 -joints stay out I I I
Use Best-o=~Lifie 2000 i e do e
Remarks: Up Wt - 175 k
Dn Wt - 125 k
Block Wt - 75k
•
Supervisor.' D. Burley / D.
ConocoPhillips Alaska Page 1 flf 1
Casing Report
Legal Well Name: CD2-31PB1 Spud Date: 6/5!2004
Common Well Name: CD2-31 P61 Report #: 1 Report Date: 6/7/2004
Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004
General Information
String Type: Surface Casing Permanent Datum: Rotary Table Hole Size: 12.250 {in) Hole TMD: 3,312.0 (ft)
Hole TVD: 2,372.0 (ft) KB-Datum: 0.84 (ft) Water TMD: (ft) Str Wt on Slips: (Ibs)
-Ground Level: - 15:90 (ft) ~ •••- • CF F!e~ration: (ft) ~ • - Liner••weriap: (ft) •• Max Hole Angle: 61.81 (°)
Circ Hours: 2.00 (hr) Mud Lost: (bbl) KB to Cutoff: 36.70 (ft) Days From Spud: 2.25 (days)
Casing Flange / Wellhead
Manufacturer: FMC Model: Producer Top Hub/Flange: (in) / (psi)
Hanger Model: Packoff Model: BTM Hub/Flange: (in) / (psi)
Actual TMD Set: 3,301.93 (ft)
Integral Casing Detail
Item Slze Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer Model Cond. Max OD Min ID Comp. Name
(in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) (in) (in)
Casing Hanger 9.625 8.765 2.19 36.70 Casing Hanger
Casing 9,625 36.00 J-55 8.765 BTC 77 3,175.15 38.89 8.921 9 5/8" 36# J-55
Float Collar 9.625 BTC 1.48 3,214.04 Y WEATHERFORD Float Collar
Casing 9.625 36.00 J-55 8.765 BTC 2 84.i 1 3,215.52 Y 8.921 9 5/8" 36# J-55
Float Shoe 9.625 BTC 2.30 3,299.63 Y RAY OIL TOOLS Float Shoe
3,301.93
Non-Integral Casing Accessories
Accessory Manufacturer Number Spacing Interval How Fixed
(ft) Top (ft) Bottam (ft)
Bowspring Centralizer WEATHERFORD 12 2,838.0 3,292.0 OverCollar
Bowspring Centralizer WEATHERFORD 33 77.0 2,760.0 OverCollar
Remarks
Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections -fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' -Circulate btms up 4 bbls/min @
260 psi - PU .130 SO 100 -Continue running csg f/ 1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. -Land casing w! FMC fluted hanger w/shoe @ 3302' - FC @ 3214'
v
Printed: 8!16/2005 7:04:00 AM
• •
ConocoPhillips Alaska Page 1 of 3
Cementing Report
Legal Well Name: CD2-31 PB1 Spud Date: _ 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004
Event Name: ROT -DRILLING Start: 6/5/2004 End: 7!2!2004
Cement Job Type: Primary
Prima 5 ueeze O en Hole S ueeze Casin Plu
Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 3,302 (ft) SQ TMD: (ft) TMD Set: Top Set: (ft}
Date Set: 6/7/2004 SQ Date: Date Set: BTM set: (ft)
Csg Type: Surface Casing S4 Type: Csg Type: Plug Date:
Csg Size: 9.625 (in.) SQ TMD: Plug Type:
• SQ Date: Drilled Out:
Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: Dowell Schlumberger Cementer: Steve Daughton Pipe Movement: Reciprocating
Pipe Movement
Rot Time Start: Time End: RPM: !nit Torque: (ft-Ibf) Avg Torque: (ft-Ibt] Max Torque: (ft-ibf)
Rec Time Start:21:00 Time End: 00:30 SPM: 1 Stroke Length: 25.0 (ft) Drag Up: 150,000 (Ibs} Drag Down: 125,000 (Ibs)
Stage No: 1 of 1
Type: Cement Casing Start Mix Cmt: 23:07 Disp Avg Rate: 7.00 (bbl/min) Returns: 100
Volume Excess %: 167.00 Start Slurry Disp1 : 23:07 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost:. (bbl)
Meas. From: 130 Start Displ: 00:14 Bump Plug: Y Gmt Voi to Surf: 1130.00 (bbl)
Time Circ Prior End Pumping: 00:53 Press Prior: 700 (psi)
To Cementing: 1.50 End Pump Date: 6/8/2004 Press Bumped: 1,100 (psi) Ann Flow After: N
Mud Circ Rate: 252 (gpm} Top Plug: Y Press Held: 10 {min) Mixing Method:
Mud Circ Press: 260 (psi} Bottom Plug: Y Float Held: Y Density Meas By: Densemeter
Mud Data
Type: Spud Mud Density: 9.6 (ppg) Visc: 55 (s/qt) PV/YP: 23 (cp)/16 (Ib/100ftz) Gels 10 sec: 5 (ib/100ft~) Gels 10 min: 10 (Ib/100ftz)
Bottom Hole Circulating Temperature: (°F) Bottom Hole Static Temperature: (°F}
Displacement Fluid Type:Mud Density: 9.6 (ppg) Volume: 228.40 (bbl)
Stage No: 1 Slurry No: 1 of 4
Slurry Data
Fluid Type: FLUSH Description: Biozan water w/ nut plug Class: Purpose: Flush & marke
Slurry Interval: (ft) To: (ft) Cmt Vol: 40.0 {bbl) Density: 8.30 (ppg) Yield: (ft'/sk) Mix Water: (gal)
Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: Q Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi)
Free Water. (%) Temperature: (°F) Compressive Strength 2: (°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: {°F) ~.
Printed: BJ76/2005 7:0322 AM
•
ConocoPhillips Alaska Page 2 of 3
Cementing ReporE
Legal Well Name: CD2-31 P61 Spud Date: 6/5/2004
Common Well Name: CD2-31PB1 Report#: 1 Report Date: 6/7/2004
Event Name: ROT - DRrLLING Start: 6/5/2004 End: 7!2/2004
Stage No: 1 Slurry No: 2 of 4
Slurry Data
Fluid Type: Spaces Description: MUDPUSH XL Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 44.0 (bbl) Density: 10.50 (ppg) Yield: (ft'/s k) Mix Water. (gal)
Water Source: lake Slurry Vof: (sk) Water Vol: (bbi) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) {psi)
Free Water: (%) .Temperature: (°F) Compressive Strength 2: {°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: (°F)
Stage No: 1 Slurry No: 3 of 4
Slurry Data
Fluid Type: LEAD Description: ASLite Class: Purpose: PRIMARY
Siuny Interval: 2,802.00 (ft}To: (ft) ~ Cmt Vol: 394.0 (bbl) Density: 10.70 (ppg} Yield: 4.28 {fN/sk) Mix Water:20.00 {gal}
Water Source: lake Slurry Vola07 (sk) Water Vo1:243.0 (bbi) Other Vof: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi)
Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: (°F)
Stage No: 1 Slurry No: 4 of 4
Slurry Data
Fluid Type: TAIL ~ Description: Class: G Purpose: PRIMARY
Slurry Interval: 3,302.00 (ft)fo: 2,802.00 (ft) Cmt Vol: 50.0 (bbi) Density: 15.80 (ppg) Yield: 1.17 (ft'/sk) Mix Water: 5.00 (gal)
Water Source: lake Slurry VQ 240 (skl Water Vo1:30.0 (bbl) Other Vol: {} Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: {°F) (psi)
Free Water. (%) Temperature: (°F) Compressive Strength 2: {°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: {°F)
Stage No: 1 Slurry No: 4 of 4 -Additives
Trade Name T e Concentration. Units Li uid Conc. Units
D-46 ~ DEFOAMER 0.2 %BWOC
D-65 DISPERSANT 0.3 %BWOC
S1 ACCELERATOR 1.0 %BWOC
Printed: 6116/2005 7:1)3:22 AM
• •
ConocoPhillips Alaska Page 3 of 3
Cementing Report
Legal Well Name: CD2-31 P61 Spud Date: 6/5/2004
Common Well Name: CD2-31PB1 Report #: 1 Report Date: 6/7/2004
Event Name: ROT -DRILLING Start: 6!5/2004 End: 7/2/2004
Casing Test Shoe Test Liner Top Test
Test Press: 2,500 {psi) Pressure: (ppge) Liner Lap:
For: 30 (min) Too{: N Pos Test: (ppge) Tool: N
Cement Found between Open Hole: (ft) Neg Test: (ppge) Tool: N
Shoe and Collar: N Hrs Before Test: Hrs Before Test:
Cement Found on Tool: N
Log/Survey Evaluation Interpretation Summary
CBL Run: N Cement Top: (ft)
Under Pressure: {psi} How Determined:
Bond Quality: TOC Sufficient: N
Cet Run: N Job Rating:
Bond Quality: If Unsuccessful Detection Indicator:
Temp Survey: N Remedial Cementing Required: N
Hrs Prior to Log: Number of Remedial Squeezes:
Remarks
Cement 9 5/8" casing as follows: Pumped 40 bbis Biozan water w/ nut plug for marker w/ rig pumps -Switch to Dowell -Pumped 2 bbis
water -Test lines to 2500 psi -Drop bottom plug -Mixed & pumped 50 bbis Mud Push XL @ .10.5 ppg -Mixed & pumped Lead slurry
AS lite3) @ 10.7 ppg -Observed nut plug marker @ sharkers w! 375 bbis lead pumped -pumped 394 bbis tots{ of lead slurry -Prep to
switch to tail slurry
Mixed & pumped Tail slurry (G w/ .2% D046, .3% D065, & 1 % S002) @ 15.8 ppg -Dropped top plug w/ 20 bbis water f/ Dowell -Switch
to rig pumps & displace cement w! 228.4 bbis 9.6 ppg mud @ 7 B/M f/ 420 to 790 psi -slowed pumps to 3 1!2 B/M for last 18.4 bbis of
displacment -Bumped plug w/ 1100 psi - C1P @ 0053 hrs. -Full circulation throughout w/ 130 bbis. 10.7 ppg cement reutms to surface
Printed: 8/162005 7:03:22 AM
•
Page 1 of 3
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME ~
CD2-31 JOB NUMBER E VENT CODE
ODR 24 HRS PROG
149.0 TMD
3,312.0 ND
2,368.0 DFS REPT NO.
2.25 3 DATE
6!7/2004
SUPERVISOR
D. Burie / D. Micke RIG NAME & NO.
Do on Driilin Inc 19 FIELD NAME I OCS NO.
ALPINE AUTH MO D
18,682.0 AILY TANG
0 CUM. TANG
0
CURRENT STATUS
Pre tD test BOPS ACCIDENTS LAST 24 HRS.? DAILY lNT W!O MUD
0 CUM INTANG W/MUD
0
24 HR FORECAST
Test BOPE- PU DP - MU BHA#2 - RIH -FIT - Drill 8 1/2" hole DATE OF LAST SAFETY MEETING
6/7/2004 DAILY TOTAL
205 298 CUM COST W/MUD
581,605
LITHOLOGY JAR tlRS OF SERVICE BHA HRS SINCE INSP LEAKOFF AFE
10034643 AUTH.
LAST SURVEY: DATE TMD INC AZIM
6R/2004 3 262.53 61.257 266.810 LAST CASING
9.625 in 3,302.0 ft NEXT CASING
7.000 In 13,737.0 ft LAST BOP PRES TEST
DENSITY(ppg) 9.60 PP ECD MUD DATA DAILY COST D GUM COST 0
FV PV/YP GELS WUHTHP FC/T.SOL OILNVAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S LIME ES
300 34/82 42/95 7.4/ 3/ / 0.5/27.5 8.7/ 0.01/0 20
BHA NO. 1 BHA i HOLE CONDITIONS BrrNO. 1
BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE /UNITS BHA LENGTH
24,568 140 120 130 8,500 ft-Ibf 977.28
ITEM DESCRIPTION NO JTS LENGTH O,D. I.D. CONN SIZE CONN TYPE
Bit ~ 1 1.00 12.250 4.500
Mud Motor 1 31.10 8.000 5.000
Sub -Float 1 2.47 8.000 2.870
Stabilizer 1 5.92 8.150 2.875
Crossover -NonMag 1 2.44 8.140 2.875
MWD 1 9.17 8.020 3.500
MWD 1 8.70 8.020 1.920
MWD 1 9.90 8.090 1.900
Sub - Bottam Hole Orienting 1 3.00 8.100 2.813
Drill Collar -NonMag 1 31.03 2.812 2.875
Drill Collar -NonMag 1 31.03 8.062 2.880
Drill Collar -NonMag 1 30.80 8.062 2.880
Crossover 1 3.02 6.750 2.780
Drill Pipe -Heavy Wgt 3 89.85 5.000 3.000
Jars 1 32.70 6.130 2.500
Drill Pipe -Heavy Wgt 23 685.15 5.000 3.000
BITS
BIT! RUN SIZE MANUF. ~ TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN I.O-D-L-B-G-O-R
1 / 1 12.250 HUGHES-CHR MX-C1 5044528 12!16!16/181/ 114.0 6/5!20 1-1-WT-A-E-1-NO-TD
BIT OPERATIONS
BIT /RUN WOB RPM GPM PRESS P 81T HRS 24Hr D15T 24Hr ROP CUM HRS CUM DEPTH CUM ROP
1 / 1 20 / 30 / 84 656 2,600 673 1.04 149.0 143.27 21.56 3,198.0 148.33
SURVEY DATA
M:D. INCL. AZIMUTH T.V.D. ~ N/S CUM EM/ CUM SECTION M.D. INCL AZIMUTH T.V.D. N/S CUM EIW CUM SECTION
3,209.94 60.927 266.030 2,319.17 -59.69 -1,807.4 1,678.38 3,262.53 61.257 266.810 2,344.60 -61.76 -1,853.4 1,720.90
PUMP / HYDRAULEC DATA
NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q (gpm) PRESS. (psi ) TOTAL Q KILLSPM /PRESSURE
1 Continenta{ Emsco 12.000 6.000 75 317.26 2,600 655.67
2 Continental Emsco 12.000 6.000 80 338.41 2,600 655.67
rnntea: wieiwun /:UL:Z3 AM
•
•
' Page 2 of 3
ConocoPhiNips Alaska, {nc.
Daily Drilling Report
WELL NAME JOB NUMBER EVENT CODE 24 NRS PROG TMD TVD DFS REPT NO. DATE
CD2-31 ODR 149.0 3 312.0 2,368.0 2.25 3 6/7/2004
O PERAT IONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 01:15 1.25 DRILL P DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD
WOB 20/30 k RPM 80 GPM 650 @ 2500 psi
String wL PU 140 SO 120 Rot. 130
Torque on/off btm - 8,500/7,500 ft. lbs.
ADT - 1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs.
01:15 02:30 1.25 DRILL P CIRC SURFAC CBU @ 650 gpm / 2400 psi / 80 rpm, pumped 40 bbis low vis sweep and circ
. hole clean.
02:30 04:15 1.75 DRILL P ~ WIPR SURFAC Backream from 3312' to 2270' - 400 gpm / 1120 psi / 80 rpm. Circ BU to clean
hole while Backreaming from 2270' to 2175'.
04:15 05:30 1.25 DRILL P WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm / 1100 psi / 80 rpm. CBU
on last stand to clean up hole.
05:30 06:30 1.00 DRILL P WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'.
06:30 08:00 1.50 DRILL P CIRC SURFAC CBU - 675 gpm / 2600 psi / 80 rpm, pumped 40 bblls high vis sweep and circ
hole clean. Flow check well, static.
08:00 09:00 1.00 DRILL P TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-SK over, began pulling tight @
1650'.Worked up to 1640' with several attempts to 50k over.
09:00 11:00 2.00 DRILL Np DH TRIP SURFAC Backream from 1670' to 970' - 500 gpm / 1400 psi ! 80 rpm. CBU on last stand
-heavy cuttings load back. Flow check well, static.
11:00 14:15 3.25 DRILL P PULD SURFAC Stand back hwdp and flex collars -lay down UBHO, mwd, stab, motor and bit.
Clean up trip mess and clear tools from rig floor.
14:15 15:15 1.00 CASE P KURD SURFAC RU to run 9 5/8" surtace casing
15:15 15:30 0.25 CASE P SFTY SURFAC Held PJSM with crew.
15:30 21:00 5.50 CASE P RUNG SURFAC Run 9 5f8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1st
four connections -fill pipe -circ & check floats) - 36 jts. (40 total) to 1624' -
Circulate btms up 4 bbis/min @ 260 psi - PU 130 SO 100 -Continue running
csg f! 1624' to 3263` - 39 jis (79 total) - PU hanger & landing jt. -Land casing
w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214'
21:00 22:30 1.50 CEMENT ~ CIRC SURFAC Rig down casing equipment - RU cmt head & fines -Circulate & condition for
cement job - ICP 300 psi @ 3 8/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125
22:30 00:00 1.50 CEMENT PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbis Biozan water w[ nut plug for
marker w/ rig pumps -Switch to Dowell -Pumped 2 bbls water -Test lines to
2500 psi -Drop bottom plug -Mixed & pumped 50 bbis Mud Push XL @ 10.5
ppg -Mixed & pumped Lead slurry (AS lite3) @ 10.7 ppg -Observed nut plug
marker @ sharkers w/ 375 bbis lead pumped -pumped 394 bbls total of lead
slurry -Prep to switch to tail slurry
24 HR SUMMARY: Drill 12 1/4" hole f! 3162' to 3312' MD -Pump sweep & circulate hole clean -Wiper trip to 1670' -RIH -pump sweep and
circ clean- POOH, lay down BHA - RU and Run 9 5/8" casing - Cmt csg.
PERSON NEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhillips Company 1 Halliburton -Sperry-Sun 2
Fairweather E&P Service 1 Halliburton -Sperry-Sun 1
Doyon Drilling Inc 27 M-I Grilling Fluids 3
Arctic Catering Inc. 5 Swaco 4
Dowell 2 FMC Corporation Wellhe 1
Halliburton -Sperry-Sun 2
• •
ConocoPhillips Alaska, Inc.
Daily Drilling Report Page 3 of 3
WELL NAME
CD2-31 JOB NUMBER EVENT CODE
ODR 24 HRS PROG ~
149.0 TMD
3,312.0 TVD
2,368.0 DFS
2.25 REPT NO.
3 DATE
6/7/2004
' MATERIALS /CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
Fuel gals 1,344 -3,815 Water, Potable bbts 120 -360
Water, Drilling bbls 350 -3,370 Fuel, Camp gals
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME ZONE TOP BASE COMMENTS
CD2-12 CD2-31 933 3.5 1440
rnntea: w iorzu~a ruc.~o nrv~
PRESSURE_INTEGRITYTEST
CONOCOPHILLIPS Alaska, Inc.
Weii dame: CD2-31 Rig: Doyon 19 Date: 6/9/2004
Drilling Supervisor: Burley /Mickey Pump used: #2 Mud Pump ~
Type of Test: OpenholeTest LOT/F1T ~i" Pumping down annulus and DP. •
Hole Size: 8-i/2" ~' Casing Shoe De th Hole De th
RKB-CHF: 36.7 Ft 3,302 Ft-MD 2,367 Ft-ND 3,332 Ft-MD 2,378 Ft-TVD
Casina Size and Description: 9-5/8" 36#/Ft ]-55 el'C ~
Casin Test Pressure Inte rit Test
Mud Weight: 9.6 ppg Mud Weight: 9.5 ppg
Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2
Test Pressure: 2,500 psi Rotating Weight: 115,000 Lbs
Rotating Weight: 75,000 Lbs Blocks/Top Drive Weight: 75,000 Lbs
BlockslTop Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg
Estimates for Test: 2.4 bbls Estimates for Test: 1046 si 1 bbis
v, ~
EMW =Leak-off Pressure + Mud Weight = 850 ,~ 9 5 PI715 Second
0.052 x TVD 0.052 x 2367 Shut-in Pressure, psi
EMW at 3302 Ft-MD (2367 Ft-TVD) = 16.4 650
Volume In ut Volume/Stroke Pum Rate:
strokes • 0.1000 13b1s/Strk • 6.0 Strk/min
Casing Test Pressure Integrit Test
Pum in Shut-in Pum ing Shut-in
Strks si Min si Strks si Min
0 0 0 2500 0 0 0
2 50 1 2500 2 60 0.25
4 150 2 2500 4 205 0.5
6 300 3 2500 6 400 1
8 500 4 2500 8 600 1.5
10 700 5 2500 10 750 2
12 900 6 2500 12 850 2.5
14 1100 7 2500 14 870 3
16 1240 8 2500 16 900 3.5
18 1400 9 2500 18 4
20 1550 10 2500 20 4.5
22 1700 15 2500 5
i
800
650
610
580
570
560
555
550
545
540
540
540
_ . . _. ~ _„.,. ,.~, 24 1900 20 2500 5.5 540
sooo
26
2050
25
2500
6
540
6
5 535
28 2250 30 2500 ..
7 530
5oo 30 2450
z 31 2500 7
5 520
.
8 515
8
5 515
20°0 .
9 515
w
9
5 515
~ .
~ 1500 10 510
w
a
1000
500
0
°
1 Barrel
s
3
4 0
S
5 1
hut-
0
In tim
16
e, M
20 2
inut
5
es
30
Vol
PU
ume
m ed
Vol
Bled
ume
Back
Volume
PUm ed
Volume
Bled Back
~~CASING TEST -t~~--LEAK-O FF TEST O P IT Poi nt 3.1 Bbls Bbis 2.0 Bbls Bbis
Comments: Tested 9 518" casin after bum ing lugs on cement job.
• •
Conoc Phl~~~ ~ ~ Casing Detail
7" Casing
Well: CD2-31
Date: 6/19/2004
DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to Landing Ring 34.84
FMC Gen V Hanger 2.40 34.84
Jts 3 to 321 319 Jts 7" 26# L-80 BTCM Csg 13471.62 37.24
Davis Lynch Float Collar 1.30 13508.86
Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 86.15 13510.16
Ray Oil Tools "Silver Bullet" Float Shoe 2.10 13596.31
13598.41
TD 8 1/2" Hale 13608.00
Total Centralizers: 94
Straight blade centralizer one per jt on jts # 1-14
Straight blade centralizer one per jt on jts. # 243, 244, 245
Straight blade centralizer one per jt on every other joint
Starting @ # 247 to # 279
Straight blade centralizer 2 per jt on jts 282 - 303 w/ stop
collars
Straight blade centralizer one per jt on jts # 303 - 319 **
330 joints in shed - 321 total jts. to run
Last 9 jts. out
Use Best-o-Life 2000 i e do e
Remarks: Up Wt - 350 + k
Dn Wt - 145 `k
Block Wt - 75k
** Did not install stop rings on jts #304 - 319 due to csg trying to stick in hole. Only 1 cent perjt.
Supervisor. D. Lufrick / L. Hill
• •
ConocoPhiliips Alaska Page 1 of 3
` Cementing Report
Legal Well Name: CD2-31 PB1 Spud Date: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004
Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004
Cement Job Type: Primary
Prima S ueeze O en Hole S ueeze Casin Plu
Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 13,598 (ft) SO TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 6/19/2004 SQ Date: Date Set: BTM set: (ft)
Csg Type: Production Casing SQ Type: Csg Type: Plug Date:
Csg Size: 7.000 (in.) SQ 7MD: Plug Type:
SQ Date: Drilled Out:
Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Go: Dowel{ Schlumberger Cementer: Jim Thompson Pipe Movement:
Pipe Movement
Rot Time Start: Time End: ; RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibt) Max Torque: (ft-ibt)
Rec Time Start: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs)
Stage No: 1 of 1
Type: Cement Casing Start Mix Cmt: 03:38 Disp Avg Rate: 7.00 (bbl/min} Returns: 100
Volume Excess %: 40.00 Start Slurry Displ : 03:38 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl)
Meas. From: N/A Start Displ: 03:50 Bump Plug: Y Cmt Vol to Surf: (bbl}
Time Circ Prior End Pumping: 05:05 Press Prior. 900 (psi}
To Cementing: End ~'ump Date: 6!19/2004 Press Bumped: 1,400 (psi) Ann Flow After: N
Mud Circ Rate: 294 (gprn) Top Plug: Y Press Held: 1,400 (min) Mixing Method: Tub
Mud Circ Press: 1,000 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densometer
Mud Data
Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 40 (s/qt) PV/YP: 8 (cp}/16 (Ib/100ft2} Gels 10 sec: 8 (Ib/100ft2 ) Gels 10 min: 11 (Ib/100ftZ)
Bottom Hole Circulating Temperature: (°F`. Bottom Hole Static Temperature: (°F)
Displacement Fluid Type:Mud Density: 9.8 (ppg) Volume: 516.00 (bbl)
Stage No: 1 Slurry No: 1 of 3
Slurry Data
Fluid Type: FLUSH Description: CW 100 Class: Purpose: Chemical was
Slurry Interval: (ft) To: (ft) Cmt Vol : 20.0 (bbl) Density: 8.30 (ppg) Yield: (ft'/sk) Mix Water. (gal)
Water Source: lake Slurry Vol: (sk) Water Vol: (bbl} Other Vol: Q Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi)
Free Water. (%) Temperature: (°F) Compressive Strength 2: (°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: (°F)
Printetl: 8l76I2005 7:03:47 AM
~i
ConocoPhillips Alaska Page Z of 3
Cementing Report
Legal Weli Name: CD2-31PB1 Spud D ate: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004
Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004
Stage No:1 Slurry No: 2 0# 3
Slurry Data
Fluid Type: FLUSH Description: MUDPUSH XL Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft'/sk) Mix Water: (gal)
Water Source: Slurry Vol: (sk) Water Voi: (bbl) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: {°F) Compressive Strength 1: (°F) (psi)
Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: (°F)
Stage No: 1 Slurry No: 3 of 3
Slurry Data
Fluid Type: TAIL Description: Class: G Purpose: PRIMARY
S1uny Interval: 13,598.00 (ft)o: 12,126.OG (ft~mt Vol: 47.0 (bbl) Density: 15.80 (ppg) Yield: 1.16 (ft'/sk) Mix Water. 5.09 (gat)
Water Source: lake water Slurry Vo1234 (sk) Water Vo1:27.8 (bbl) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (°F) Compressive Strength 1: {°F) (psi)
Free Water: {%) Temperature: (°F) Compressive Strength 2: (°F) (psi)
Fluid Loss: (cc) Temperature: (°F)
Fluid Loss Pressure: (°F}
Stage No: 1 Slurry No: 3 of 3 -Additives
Trade Name T e Concentration Units Li uid Conc. Units
D-65 DISPERSANT 0.3 %BWOC
B-155 retarder 0.0 ~°BWOC
D-46 DEFOAMER 0.2 %BWOC
D-167 Fluid loss 0.4 %BWOC
Printed: 8/76/2005 7:03:47 AM19
• ~
ConocoPhillips Alaska Page 3 of 3
. Cementing Report
Legal Well Name: CD2-31PE1 .Spud Date: 6/5/2004
Common Wel{ Name: CD2-31PB1 Report#: 3 Report Date: 6/19/2004
Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004
Casing Test Shoe Test Liner Top Test
Test Press: (psi) Pressure: (ppge) Liner Lap:
For: (min) Tool: Pos Test: (ppge) Tool:
Cement Found between Open Hole: (ft) Neg Test: (ppge) Tool:
Shoe and Collar: I ors Before Test: Hrs Before Test:
Cement Found on Tool:
Log/Survey Evaluation ~ Interpretation Summary
CBL Run: Cement Top: (ft)
Under Pressure: (psi) How Determined:
Bond Quality: TOC Sufficient:
Cet Run: Job Rating:
Bond Quality: If Unsuccessful Detection Indicator:
Temp Surrey: ~ Remedial Cementing Required:
Hrs Prior to Log: ~ Number of Remedial Squeezes:
Remarks
Pump 5 bbls CW 100. Test tines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8
cement. Drop top plug. Dowell pumped 20 bbls H2O. Rig displaced with 497 bbls 9.8 mud. Bumped plug. Check floats OK. Test csg to
3500 psi.
rnn[ea: wiorcuvo rv~.wr r.rvi
• •
Page 1 of 1
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME
CD2-31 JOB NUMBER EVENT CODE
ODR 24 HRS PROG TMD
13,608.0 TVD
7,342.0 OFS
13.25 KEPT NO.
14 DATE
6/18/2004
SUPERVISOR
Donnie Lutrick / La Hil R1G NAME & NO.
Do on Drillin
Inc 19 FlELD NAME ! OCS NO.
ALPINE AUTH MD
18,682.0 pA1LY FANG
0 CUM. TANG
0
CURRENT STATUS
Ri down after cement ob. ACCIDENTS LAST 24 HRS.1 DAILY INT W/O MUD
0 CUM INTANG W! MUD
0
24 HR FORECAST
Run 7". Cement 7". Test 80P. DATE OF LAST SAFETY MEETING
6/14/2004 DAILY TOTAL
87 503 CUM COST W/MUD
2 379,807
LITHOLOGY
FINE SAND JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF
16.38 AFE
10034643 AUTH.
LAST SURVEY: DATE TMO INC
6/16/2004 13,533.65 80.320 AZIM
318.950 LAST CASING
9.625 In 3,302.0 ft NEXT CASING
7.000 in 13,737.0 ft LAST BOP PRES TEST
6/14/2004
DENStTY(ppg) 9.80 PP ECD 9.80 MUD DATA DAILY COST 0 CUM COST 0
FV PV/YP GELS WLlHTHP FC(f.SOL OILNVAT 9roSandJMBT Ph/pM Pf/!V{f C) Ca H2S LIME ES
42 7120 8112 4.OR.2 ~ 1/ / 0.2(18.0 9.0/ 0.05/2 4
OPERATIONS SUMMARY
FROM- TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 02:15 2.25 CASE P RUNC INTRM1 Rih w/ 7" csg from 250' to 3261'.
02:15 02:45 0.50 CASE P CIRC INTRMI Circ 1 csg volume at 5 bpm at 310 psi.
02:45 03:30 0.75 CASE T EQ1P OTHR INTRMI Change out Franks fill up tool. Cup was leaking.
03:30 07:45 4.25 CASE P RUNC INTRMI RIH wi 7" csg from 3261' to 7590'.
07:45 08:45 1.00 CASE P CIRC INTRMI Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. Dn wt -120k.
08:45 13:00 4.25 CASE P RUNC 1NTRM1 RIH w/ 7" csg from 7590' to 11,816'.
13:00 15:00 2.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. Dn wt - 145 k.
15:00 00:00 9.00 CASE P RUNC INTRM1 RIH w! 7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight
460 K up and All of weight down to make a few feet at a time. Attempts to
circulate tried to pack off.
24 HR SUMMARY: Ran casing from 250' to 13515'.
PERSON NEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhil{ips Company 1 Halliburton -Sperry-Sun 2
Fairweather E&P Service 1 Haliiburton -Sperry-Sun
Doyon Drilling lnc 27 M-I Drilling Fluids 3
Arctic Catering inc. ~ 5 Swaco 4
Dowell 2 FMC Corporation Wellhe 1
Ha{liburton -Sperry-Sun 2
MATERIALS /CONSUMPTION
{TEM UNITS USAGE ON HAND ITEM UN1TS USAGE ON HAND
Fuel gals 750 9,075 Water, Potable bbis 120 680
Water, Drilling bbis 250 820 Fuei, Camp gals 2,080
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME ZONE TOP BASE COMMENTS
GD2-36 Cd2-31 20 2 1470
YMI20: Ol-10/LWD /:UL:4O HIVI
• •
Page 1 of 2
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME
CD2-31 JOB NUMBER E VENT CODE
ODR 24 HRS PROG TMD
13,608.0 TVD
7,342.0 DFS
14.25 REPT NO.
15 GATE
6/19/2004
SUPERVISOR
Donnie Lutrick / La Hi RIG NAME & NO.
l Do on Drillin Inc 19 FIELD NAME i OCS NO.
ALPINE AUTH MD
18,682.0 OAILY TANG
0 CUM. TANG
0
CURRENT STATUS
Circulatin rior to doin FIT. ACCIDENTS LAST 24 HRS.? DAILY INT W/0 MUD
0 CUM INTANG W! MUD
0
24 HR FORECAST
FIT. Chan a out mud s stem to fv106M and drill. DATE OF LAST SAFETY MEETING
6!14!2004 DAILY TOTAL
449,583 CUM COST W! MUD
2 829,390
LITHOLOGY
FINE SAND JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF
16.38 AFE
10034643 AUTH.
LAST SURVEY: DATE TMD INC AZIM
6/16/2004 13,533.65 80.320 318.950 LAST CASING
7.000 in 13 598.0 ft NEXT CASING
4.500 in 18,682.0 ft LAST BOP PRES TEST
6/19/2004
DENSITY(ppg) 9.80 PP ECD 9.80 MUD DATA DAILY COST 0 CUM COST 0
FV PVlYP GELS WLMTHP FC/T.50L OILNVAT °J°Sand/M8T PhipM PfiMf Cf Ca H2S LIME ES
40 8/16 8/11 5.2/7.2 1/ 1 0.2/15.0 9.0/ 0.05/2 4
BHA NO. 4 BHA /HOLE CONDITIONS BR No. 4
BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE /UNITS BHA LENGTH
376.78
ITEM DESCRIPTION NO JTS LENGTH O.D. LD. CONN SIZE CONK TYPE
Bit 1 0.75 6.125 2.250
Motor 1 32.48 4.974 2.794
6" Stab 1 5.53 4.790 2.256
Sub -Float 1 2.40 4.625 2.250
MWD 1 8.56 4.720 2.625
MWD 1 24.47 4.750 1.250
MWD 1 10.86 4.700 1.250
MWD 1 11.01 4.630 2.815
NM Flex DC's 3 93.84 4.700 2.250
Crossover 1.16 4.770 2.625
3 X HWDP 3 91.95 3.500 2.060
Jar DNT 32.46 4.750 2.000
2 X HWDP 2 61.31 3.500 2.063
BITS
BIT I RUN SIZE MANUF. TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN i-O-D-L-B-G-O-R
4 / 4 6.125 HUGHES-CHR HC 306 7102089RB 12/12/13/13/13!13 13,608.0 6/191200 1-1-CT-M-D-I-EC-TD
BIT OPERATIONS
BIT /RUN WOB RPM GPM PRESS P BIT HRS 24Hr DIST 24Hr ROP CUM HRS CUM DEPTH CUM ROP
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 00:30 fl.50 CASE P RUNG 1NTRM1 Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and
landed casing @ 13598'.
00:30 01:00 0.50 CASE P RURD INTRM1 Rigged down fill up tool and made up cement head and lines.
01:00 03:15 2.25 CEMENT CIRC (NTRM1 Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure
and flow stabilized. Final circulating pressure 1000 PS{ @ 7 BPM with full
returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back
on hanger. PJSM for cement job.
03:15 05:15 2.00 CEMENT PUMP INTRMI Pump 5 hbis CW100. Test lines to 3500 psi. Pump 15 bb)s CW100, 50 bbis
12.5 mud push. Drop bottom plug and 47 bbis 15.8 cement. Drop top plug.
Dowell pumped 20 bbis H2O. Rig displaced with 497 bbis 9.8 mud. Bumped
plug with 1400 PSI. Check floats OK. CIP @ 0505Hrs. 6H 9/04.
Printed: 8116/2005 7:02:56 AM
• •
Page 2 of 2
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME
CD2-31 JOB NUMBER EVENT CODE
ODR 24 HRS PROG TMD
13,608.0 TVD
7,342.0 DFS
14.25 KEPT NO.
15 DATE
6/19/2004
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
05:15 06:00 0.75 CASE P MIT INTRM1 Rigged up and tested casing 3500 PS{ for 30 miniutes.
06:00 06:45 0.75 CASE P RURD INTRMI Rigged down cement and casing tools.
06:45 07:45 1.00 CASE P DEQT INTRMI Laid down landing joint. Installed and tested packoff.
07:45 08:45 1.00 WELCTL EQRP INTRM1 Changed out rams from 7" to VBR.
08:45 13:00 4.25 WELCTL BOPE INTRMI Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke lines,
kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP
to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing
tests. Pull test plug and install wear bushing.
13:00 13:30 0.50 DRILL P RIRD ~ INTRM1 Picked up bales and elevators.
13:30 17:30 4.00 DRILL P PULD INTRMI Made up BHA and RIH. Shallow tested MWD.
17:30 20:30 3.00 DRILL P PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'.
20:30 00:00 3.50 DRILL P TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'.
24 HR SUMMARY: Ran and landed casing at 13598'. Circulated. Cemented casing. Tested casing to 3500 PSI. Rigged down tools and tested
BOP. Made up and RIH with BHA and 150 Jts. DP from pipe shed. RIH with DP from derrick to 12500'.
PERSON NEL DATA
COMPANY SERVIf:E NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhillips Company 1 Hailiburton -Sperry-Sun
Fairweather E&P Service 1 M-I Drilling Fluids 3
Doyon Drilling Inc 27 Swaco 4
Arctic Catering Inc. 5 FMC Corporation Wellhe 1
Dowell 2 ASRC Energy Services ( 2
Halliburton -Sperry-Sun 2 Epoch Well Services Inc 2
Halliburton - Sperry-Sun 2
MATERIALS /CONSUMPTION
ITEM UNITS USAGE ON NAND ITEM UNITS USAGE ON HAND
Fuel gals 560 8,515 Water, Potable bbls 120 960
Water, Drilling bbls 950 1,070 Fuel, Camp gals 2,080
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME .ZONE TOP BASE COMMENTS
CD2-36 Cd2-31 1449 3.5 1420
CD2-31 CD2-31 392 4.3 1400
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
Well Name: CD2 -31 Rig: Doyon 19 Date: 6/19/2004 Volume Input Pum Rate:
Drilling Supervisor: Lutrick /Hill Pump used: Cement unit ~ Barrels •' ebls/stsk • 0~8 ab1/mtn
Type of Test: Annulus Leak Off Test for Disposal Adequacy • Pumping down annulus. ~ Casin g Test Pressure In tegrit Test
Hofe Size: s-1/z"
8 Ft
RKB-CHF: 34 ~ Casin Shoe De th
302 Ft-MD 2,367 Ft-TVD
3 hole De th
12,126 Ft-MD 6,828 Ft-TVD Pum
Bbls ing
si Shu
Min t-in
si Pum
Bbls in
si Shu
Min t-in
si
,
.
Casinq Size and Description: 9-5/8" 36#/Ft J-55 gTC •
Chan es for Annular Ade uac Test Pressure Inte rit Test 0.5
1 25
56 0
0.25 480
460
shoe test results
c
in
t in comments Mud Weight: 9.8 ppg 1.5 86 0.5 450
as
g
er
u
tion references outer
i
D casing string Inner casing OD: 7.0 In. 2 116 1 444
p
escr
t drilled below outer
th
i
i .
casing 2.5 147 1.5 444
a
ze
s
th
d TOC for Hofe De
t
ti . 3 177 2 444
.
p
e
ma
OD at ri
ht
a
in
i
E
t Desired PIT EMW: 15.5 ppg 3.5 212 2.5 439
g
s
g
er
nner c
n Estimates for Test: 702 si 0.8 bbis 4 242 3 439
.r • 4.5 268 3.5 439
EMW =Leak-off Pressure + Mud Weight = 606 PIT 15 Second 5 298 4 439
+ 9 8
052 x ND 0.052 x 2367
0 Shut-in Pressure, si 5.5 328 4.5 434
.
EMW at 3302 Ft-MD (2367 Ft-ND) = 14.7. 460 6 353 5 434
6.5 384 5.5 429
,oo0 ~ ~ 7 409 6 429
5 434 6
5 429
7. .
8 464 7 429
8.5 485 7.5 424
9 510 8 424
9.5 540 8.5 424
w ~ 0 60 9 419
p, c 1 5
a 10.5 586 9.5 419
w soo 11 606 10 419
'"""'`' " G 11
5 555
~ - .
I~
fi. 9
12
520
12.5 515
13 515
13.5 525
14 530
14.5 535
0
z
z
s
so
o z a s
Barrel s ,
s a , z , a ,s o
S s ,
hut-I a
n tim
T P s
e, M
t
i o
inut
es Volume
PUm ed Vol
Bled ume
Back Vo
PU lume
m ed Volume
Bled Back
~t~r CASiNG TEST ~ -LEAK- OFF TEST O P I
o n s s s s
Comments: 9 5/8 LOT =16.4 PPG EM
•
•
• i
;`-~ -
MICROFILMED
03/01/2008
DO NOT PLACE
`:,
""~
:--:
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc
~
1. Operations Performed:
~;1
h-:'-t(~ .APR I 9 2007
Alaska 011 & Gas Cons. Commission
REPORT OF SUNDRY WELL OPERATIONS Anchorage
o
Time Extension 0
Re-enter Suspended Well 0
Abandon 0
Alter Casing 0
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
"'-','
Repair Well 0
Pull Tubing 0
Operat. ShutdownD
Change Approved Program 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 53'
8. Property Designation:
ADL 380075, 387207, ASRCNPR1 I
11. Present Well Condition Summary:
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE
PRODUCTION
SLOTTED LINER
Perforation depth:
measured
true vertical
measured
true vertical
Length
109'
3249'
13545'
5441'
Measured depth:
true vertical depth:
18131' /
7311' /
Size
16"
9-5/8"
7"
4-1/2"
Plug Perforations 0
Perforate New Pool 0
Perforate 0
4. Current Well Status:
Development [2]
Stratigraphic 0
Stimulate [2]
Waiver 0
Other
Exploratory
Service
o
o
. 5. Permit to Drill Number:
204-082 (
6. API Number:
50-1 03-20493-00 .-
9. Well Name and Number:
CD2-31 <"
10. Field/Pool(s):
Colville River Field 1 Alpine Oil Pool r
feet
feet
Plugs (measured)
Junk (measured)
7980'-8480'
feet
feet
MD
TVD
Burst
Collapse
109'
3302'
13598'
18119'
sCANNED APR 262007
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 12628' MD.
Packers & SSSV (type & measured depth) No packer
Cameo TRM-4E SSSV @ 2307'
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl
2262 1
2855 19
15. Well Class after proposed work:
Exploratory 0 Development [2] Service 0
16. Well Status after proposed work:
Oil [2] GasD WAGD GINJD WINJ 0
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
307-079
13.
Prior to well operation
Subsequent to operation
14. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations _X
Contact
Printed Name
Signature
Tim Schneider
T~7Scþ'neider
I f/Sc0r¡{lô
Form 10-404 Revised 04/2004
Oil-Bbl
2511
3,497
Casinç¡ Pressure
Tubing Pressure
286
313
1179
1444
WDSPLD
Title
Phone
Production Engineer
265-6859 Date
~v -( f-() l
n P I ~ r K'M BFl APR 2 4 2007
Prepared bv Jeanne L Haas 263-4470
,# t¡!zJØ7ubmiIOriQinaIOnIY
0/'
'-
'-"
CD2-31 Stimulation results:
Summary of stimulation job:
3-19-07:
Pump 9 frac stages in stair steps; 2, 4, 7 & (12 PPA + 15 Bio-balls pumped between stages for
diversion), 3704 bbls total slurry, 200 bbls diesel for freeze protect. AIR-25 BPM, AIP-1 000 psi,
ISIP-2095 psi, 431,098 Ibs.16/30 White Sand in perfs.
Well test:
4/6/07: 3497 bopd, 19 bwpd, 2.9 mmcfpd, 313 WHP
.~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 11, 2007
SCANNED APR 2 7 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West th Avenue, Suite 100
Anchorage, AK 99501
aðlt- O'b ()-
Dear Mr. Maunder:
Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated
3/31/07 was incomplete.
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was
noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07.
Please find enclosed updated spreadsheet, and replace. As per previous agreement with the
AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~.z::~---_/
ConocoPhillips Well Integrity Project Supervisor
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTO# cement pumped cement date inhibitor sealant date
ft bbls ft <:Ial
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-109 6" na 6" na 2.5 2/18/2007
C02-404 206-054 6" na 6" na 1.8 3/22/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
C02-30 203-135 8" na 8" na 3 3/8/2007
CD2-31 204-082 15" na 15" na 6 3/8/2007
C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
C02-37 202-211 29" na 29" na 13.8 2/18/2007
C02-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 .8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 3/8/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 3/8/2007
Alpine Field
March 31,2007
.
~
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
March 31,2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
.....,..,..'jIIII'_...........,
Dear Mr. Maunder:
$rNDIEÐ APR fj {) 20D7
.
...olò~
~ö4
, ,-..
i~\ ',..J
;ì
<~¡
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these wells were found to have a void in the condqçJAr.hy surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered
to prevent water from entering the annular space. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place and meets the
requirements of form 10-404, Report of Sundry Operations.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions.
Sincerely,
~~C
Jerry Dethlefs
ConocoPhillips Well Integrity Proj Supervisor
Attachment
.
.
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTO# cement pumped cement date inhibitor sealant date
ft bbls ft gal
C02-1 205-118 4" na 4" na 2 2/18/2007
C02-2 205-1 09 6" na 6" na 2.5 2/18/2007
C02-7 203-187 16" na 16" na 7.5 2/17/2007
C02-9 202-129 22" na 22" na 10.5 2/17/2007
C02-12 203-073 16" na 16" na 7.5 2/17/2007
C02-14 201-177 4" na 4" na 2 2/17/2007
C02-15 201-159 12" na 12" na 5.7 2/17/2007
C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007
C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007
C02-18 203-151 36" na 36" na 17 2/17/2007
C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007
C02-21 204-245 6" na 6" na 2.5 2/18/2007
C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007
C02-24 201-095 6" na 6" na 1 3/8/2007
C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007
C02-28 202-217 29" na 29" na 11 3/8/2007
C02-30 203-135 8" na 8" na 3 3/8/2007
C02-31 204-082 15" na 15" na 6 3/8/2007
C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007
C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007
C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007
C02-37 202-211 29" na 29" na 13.8 2/18/2007
C02-38 202-171 18" na 18" na 8.5 2/18/2007
C02-39 201-160 34" na 34" na 16.2 2/18/2007
C02-44 202-165 13" na 13" na 6.2 2/18/2007
C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007
C02-47 201-205 25" na 25" na 11.9 2/18/2007
C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007
C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007
CO2-53 204-089 4" na 4" na 2 2/18/2007
CO2-54 204-178 8" na 8" na 3.7 2/18/2007
CO2-55 203-118 13" na 13" na 6 2/18/2007
CO2-57 204-072 8" na 8" na 1 3/8/2007
CO2-58 203-085 6" na 6" na 1 318/2007
CO2-59 204-248 6" na 6" na 1.5 3/8/2007
C02-60 205-068 6" na 6" na 1 318/2007
Alpine Field
March 31,2007
.
.
SARAH PALIN, GOVERNOR
A.1~A.SIiA OIL AlO) GAS
CONSERVATION COMMISSION
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Tim Schneider
Production Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510
Re: Colville River Field, Alpine Oil Pool, CD2-31
Sundry Number: 307-079
"OlÖy
~oq
~MAR 062007
Dear Mr. Schneider:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED this 6' day of March, 2007
Encl.
".
.
œr,/),o1 D?:::J ..5' /
STATE OF ALASKA /?
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
Operational Shutdown 0
Plug Perforations 0
Perforate New Pool 0
1. Type of Request:
o
o
o
Pull Tubing
Abandon
Suspend
Alter casing
Repair well
Change approved program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
RECEIVED
MAR 0 1 2007
Alaska ŒI & Gas Cons. Comm;' .
A 1St
nch
o
Time Extension 0
Re-enter Suspended Well 0
o
o
o
Perforate 0
o
Stimulate
Waiver
Other 0
4. Current Well Class:
Development 0
Stratigraphic 0
Exploratory 0
Service 0
5. Permit to Drill Number:
204-082
6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510
7. If perforating, closest approach in pool(s) opened by this operation to nearest property line
where ownership or landownership changes:
Spacing Exception Required? Yes 0 No 0 CD2-31
9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s):
ADL 380075; 387207,'ASRCNPR1 . RKB 53' Colville River Field/ Alpine Oil Pool
12. PRESENT WELL CONDITION SUMMARY
Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
18131' , 7311' . 7980'-8480'
Casing Length Size MD TVD
CONDUCTOR
SURFACE
PRODUCTION
SLOTTED LINER
109'
3249'
13545'
5441'
16"
9-5/8"
7"
4-112"
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Date:
Signature
50-103-20493-00
8. Well Name and Number:
109'
3302'
13598'
18119'
Tubing Size:
3-1/2"
Packers and SSSV MD (ft)
Packer = 12629'
SSSV= 2307'
14. Well Class after proposed work:
Exploratory 0 Development 0
16. Well Status after proposed work:
Oil 0 Gas 0
WAG 0 GINJ 0
Contact:
Title:
Phone 265-6859
Commission Use Only
Conditions of approval: Notify Commission so that a representative may witness
Packers and SSSV Type:
Packer = ZXP Liner packer (38' of 43' seal
SSSV= Cameo TRM-4E assy. In seal bore)
13. Attachments: Description Summary of Proposal 0
Detailed Operations Program 0 BOP Sketch 0
15. Estimated Date for
Commencing Operations: April 2007
17. Verbal Approval:
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name neider
Plug Integrity 0 BOP Test 0
Mechanical Integrity Test 0
Location Clearance 0
Other:
Subsequent Form Required: l-\.a
Approved by:
Form 10-403 Revised 06/2006 n R I
Burst
Collapse
Tubing Grade:
L-80
Tubing MD (ft):
12628'
Service 0
Plugged 0
WINJ 0
Abandoned 0
WDSPL 0
Tim Schneider @ 265-6859
Production Engineer
Date J-/0;Z
RBDMS BFt MAR 0 6 2007
Date: ß.. 5"",.01"
';,46 7 submi~uPIi~t.e '2..' 07
"~
.
.
Overview:
CD2-31: A hydraulic fracture treatment will be performed in the open hole horizontal section to
establish communication vertically and longitudinally throughout the Alpine "An and "C" sands. A
4-1/2" liner is inside the open hole interval with perforated 5' pups spaced throughout the liner
section. Bio-balls will be used to divert the sand stages and 3 RA tracers; Ir-192, Sc-46 , and Sb-
124 will be added to determine the effectiveness of diversion in an effort to create multiple
fractures along the openhole interval.
This treatment will increase the wells production rate and reserves. A coil clean out will only be
performed should it be necessary post-frac. "
./
Procedure:
1. MIRU seven clean insulated frac tanks with a berm surrounding the tanks that holds the tank
volume plus 10%. Load tanks with seawater from the injection system (approximately 2500
bbls are required for the treatment)
2. Rig up stimulation equipment and stab Tree Saver. (Test tree saver seals to expected
pressure using warm diesel to insure seal integrity in tubing hanger).
3. Pressure test surface lines to 9500 psi
4. Pump the 100 bbl Breakdown with Schlumberger's borate x-link fluid system (YF125ST).
Bring pumps up to maximum rate ASAP.
-- 5; Pump the following schedute at 25 BPMwithamaximum pressure of 9000 psI, addbre:aker
as per lab results. Maintain 3000 þsion the IA during the treatment. K
· 100 bbls YF125ST Pad (\O""'~\ ~..:>~\"'~ ~\,,;)~-\ ~ \O~O~\
· 35 bbls YF125ST wI 2 ppa 16/30 White Sand JJ1~
· 70 bbls YF125ST wI 4 ppa 16/30 White Sand ~ 15"
· 100 bbls YF125ST wI 7 ppa 16/30 White Sand
· 25 bbls YF125ST w/12 ppa 16/30 White Sand
· Pump 20 balls in the next stages pad fluid.
Repeat treatment above 8 times.
· Flush the last stage with linear YF125ST and freeze protect
Total Sand: -400,000Ibs.
6. Monitor the surface pressure fall-off at the end of the job for 30 min (or until closure is
verified) if the well does not screen out.
7. Rig down equipment, (and prep for next well frac after evaluation by Engineering) move off
location.
FCO if required with slick diesel.
~~.i-
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2006
Permit to Drill 2040820,
Well Name/No. COLVILLE RIV UNIT CD2-31
Operator CONOCOPHILLlPS ALASKA INC
J>rzJ çj ~ ÀN:J Y
API No. 50-103-20493-00-00
MD 18131""/
TVD 7311 ~ Completion Date 7/2/2004 /
Completion Status 1-01 L
Current Status 1-01L
UIC N
----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey ~
DATA INFORMATION
Types Electric or Other Logs Run: Gr/ReslDens/Neu
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint
12685 Gamma Ray
200
Interval OH /
Start Stop CH Received Comments
7956 18131 7/16/2004 IIFR
7956 18131 7/16/2004 IIFR
7956 18131 7/16/2004 MWD
7956 18131 7/16/2004 MWD
0 13245 7/16/2004 IIFR PB1
0 13245 7/16/2004 IIFR PB1
0 13245 7/16/2004 MWD PB1
0 13245 7/16/2004 MWD PB1
3288 13161 Open 9/28/2004 PB 1, GR, NEUTRON,
DENSITY,
3250 13245 Open 9/28/2004 PB 1, GR, NEUTRON,
DENSITY, MWD/MAD
3274 18131 Open 9/28/2004 EWR4, DGR, CTN, ACAL,
ASLD,ROP,GRC,FET
3312 13245 DUAL GAMMA RAY,
THERMAL NEUTRON
POROSITY, ASLD, ACAL
.
Log/ Electr
Data Digital Dataset Log Log Run
Type Med/Frmt Number Name Scale Media No
I ED . aI Asc Directional Survey
I~ Directional Survey
! ED ã;/ Asc Directional Survey
-RPt Directional Survey
ÉD 'Et" Asc Directional Survey
cI Asc Directional Survey
ED Directional Survey
.RØ1 Directional Survey
ED V1IF 12685 Induction/Resistivity
12685 LIS Verification
12697 Induction/Resistivity
.
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
Permit to Drill 2040820
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2006
Well Name/No. COLVILLE RIV UNIT CD2-31
Operator CONOCOPHILLlPS ALASKA INC
MD 18131 TVD 7311
ADDITIONAL INFORMATION
Well Cored? Y Æi:)
Chips Received? ~
Analysis
Received?
Y'"1-N-
Completion Date 7/2/2004
Completion Status 1-01L
Current Status 1-01L
API No. 50-103-20493-00-00
UIC N
Comments:
-~--
Compliance Reviewed By:
Daily History Received?
~/N
~
Formation Tops
mi-o
Date: 7~ ~'c
.
.
e
-
ConocJPt,illips
Casing Detail
9518" Surface Casino
(=704-oB-ð-
Well:
Date:
CD2-31
6/7/2004
DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
,
Doyon 19 RKB to Landing Ring 36.70
I FMC Gen V Hanger 2.19 36.70
I
I
, Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg 3175.15 38.89
Davis Lynch Float Collar 1.48 3214.04
Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 84.11 3215.52
Ray Oil Tools "Silver Bullet" Float Shoe 2.30 3299.63
3301.93
TD 12 1/4" Surface Hole 3312.00
RUN TOTAL 45 BOWSPRING CENTRALIZERS -
1 per jt on Jt #1 - #12 (One stop ring on Jt #2)
and over co.llars on jts# 14,16,18,20,22,24,26,28,30,
32, 34, 36, 3ß,40, 42, 44,46, 48, 50, 52, 54, 56, 58,60,62
64,64,66,613,70,72,74,76,78
86 joints in the pipe shed. Run 79 joints -7 - joints stay out
f"..
c...,.,J ~ ""- '\ ~'r' \. "'- C:::-\.. \. _-l
,
(', , ,
ÐT'-\)~Q \ P\~ o.~(')\\ 1....
,
1\ " \~ \~. ~- . '.~"~~\\ ,
'Y\,o ,,-- - '- . ¡; ~"-" .. -., ..........,
~ ~c r}'\l\ \~l. -f"\ E...
, r '(5
.
Use Best-o-Ufe 2000 pipe dope
Remarks: Up Wt - 175 k
On Wt - 125 k
Block Wt - 75k
Supervisor: D. Bur/ey / D. Mickey
ConocoPhillips Alaska Page 1 of 1
Casing Report
Legal Well Name: CD2-31 PB1 Spud Date: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004
Event Name: ROT - DRILLING Start: 6/5/2004 End: 7/2/2004
General Information
String Type: Surface Casing Permanent Datum: Rotary Table Hole Size: 12.250 (in) Hole TMD: 3,312.0 (ft)
Hole TVD: 2,372.0 (ft) KB-Datum: 0.84 (ft) Water TMD: (ft) Str Wt on Slips: (Ibs)
Ground Level: 15:90 (ft) " ,~- " CF E!evation: (ft) Liner..Overlap: (ft) Max Hole Ang!o: 61.81 n
Circ Hours: 2.00 (hr) Mud Lost: (bbl) KB to Cutoff: 36.70 (ft) Days From Spud: 2.25 (days)
Casing Flange / Wellhead
Manufacturer: FMC Model: Producer Top Hub/Flange: (in) / (psi)
Hanger Model: Packoff Model: BTM Hub/Flange: (in) / (psi)
Actual TMD Set: 3,301.93 (ft)
Integral Casing Detail
Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THO Manufacturer Model Condo Max 00 Min 10 Compo Name
(in.) (Ibltt) (in) (ft) (ft) (ft-Ibf) (in) (in)
Casing Hanger 9.625 8.765 2.19 36.70 Casing Hanger
Casing 9.625 36.00 J-55 8.765 BTC 77 3,175.15 38.89 8.921 9 5/8" 36# J·55
Float Collar 9.625 BTC 1.48 3,214.04 Y WEATHERFORD Float Collar
Casing 9.625 36.00 J-55 8.765 BTC 2 84.11 3,215.52 Y 8.921 9 5/8" 36# J-55
Float Shoe 9.625 BTC 2.30 3,299.63 y RAY OIL TOOLS Float Shoe
3,301.93
-.-
Non-Integral· Casing Accessories
Accessory Manufacturer Number Spacing Interval How Fixed
(ft) Top (ft) Bottom (ft)
Bowspring Centralizer WEATHERFORD 12 2,838.0 3,292.0 OverCollar
Bowspring Centralizer WEATHERFORD 33 no 2,760.0 OverCollar
Remarks
Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbls/min @
260 psi - PU 130 SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. - Land casing w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214'
e
e
Printed: 8/16/2005 7:04:00 AM
e
e
GonocoPhillips Alaska Page 1 of 3
Cementing. Report
Legal Well Name: CD2-31PB1 Spud Date: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004
Event Name: ROT ~ DRILLING Start: 6/5/2004 End: 7/2/2004
Cement Job Type: Primary
Primary Squeeze Open Hole Squeeze Casing Plua
Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 3,302 (ft) sa TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 6/7/2004 sa Date: Date Set: BTM set: (ft)
Csg Type: Surface Casing sa Type: Csg Type: Plug Date:
Csg Size: 9.625 (in.) sa TMD: Plug Type:
sa Date: Drilled Out:
Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: Dowell Schlumberger Cementer: Steve Daughton Pipe Movement: Reciprocating
Pipe Movement
Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Rec Time Start:21 :00 Time End: 00:30 SPM: 1 Stroke Length: 25.0 (ft) Drag Up: 150,000 (Ibs) Drag Down: 125,000 (Ibs)
Stage No: 1 of 1
Type: Cement Casing Start Mix Cmt: 23:07 Disp Avg Rate: 7.00 (bbl/min) Returns: 100
Volume Excess %: 167.00 Start Slurry Displ: 23:07 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl)
Meas. From: 130 Start Displ: 00:14 Bump Plug: Y Cmt Vol to Surf: 130.00 (bbl)
Time Circ Prior End Pumping: 00:53 Press Prior: 700 (psi)
To Cementing: 1.50 End Pump Date: 6/8/2004 Press Bumped: 1,100 (psi) Ann Flow After: N
Mud Circ Rate: 252 (gpm) Top Plug: Y Press Held: 10 (min) Mixing Method:
Mud Circ Press: 260 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densemeter
Mud Data
Type: Spud Mud Density: 9.6 (ppg) Vise: ;)5 (s/qt) PVIYP: 23 (cp)/16 (lb/100ft2) Gels 10 sec: 5 (lb/100ft2) Gels 10 min: 10 (lb/100ft2)
Bottom Hole Circulating Temperature: ("F) Bottom Hole Static Temperature: ("F)
Displacement Fluid Type:Mud Density: 9.6 (ppg) Volume: 228.40 (bbl)
Stage No: 1 Slurry No: 1 of 4
Slurry Data
Fluid Type: FLUSH Description: Biozan water w/ nut plug Class: Purpose: Flush & marke
Slurry Interval: (ft) To: (ft) Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: ("F) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: (OF)
Printed: 8/16/2005 7:03:22 AM
e
e
ConocoPhillips Alaska Page 2 of 3
Cementing Reþort
Legal Well Name: CD2-31 PB 1 Spud Date: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004
Event Name: ROT - DRJLLlNG Start: 6/5/2004 End: 7/2/2004
Stage No: 1 Slurry No: 2 of 4
Slurry Data
Fluid Type: Spacer Description: MUDPUSH XL Class: Purpose: SPACER
Slurry Interval: (ft) To: (ft) Cmt Vol: 44.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: (OF) Compressive Strength 1: ("F) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: ("F) (psi)
Fluid Loss: (cc) Temperature: ("F)
Fluid Loss Pressure: (OF)
Stage No: 1 Slurry No: 3 of 4
Slurry Data
Fluid Type: LEAD Description: ASLite Class: Purpose: PRIMARY
Slurry Interval: 2,802.00 (ft)To: (ft) Cmt Vol: 394.0 (bbl) Density: 10.70 (ppg) Yield: 4.28 (ft3/sk) Mix Water: 20.00 (gal)
Water Source: lake Slurry Vol507 (sk) Water Vol: 243.0 (bbl) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: ("F)
Stage No: 1 Slurry No: 40f4
Slurry Data
Fluid Type: TAIL Description: Class: G Purpose: PRIMARY
Slurry Interval: 3,302.00 (ft)To: 2,802.00 (ft) Cmt Vol: 50.0 (bbl) Density: 15.80 (ppg) Yield: 1.17 (ft3/sk) Mix Water: 5.00 (gal)
Water Source: lake Slurry Vol:240 (sk) Water Vol: 30.0 (bbl) Other Vol: () Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi)
Fluid Loss: (cc) Temper3ture: (OF)
Fluid Loss Pressure: (OF)
Stage No: 1 Slurry No: 4 of 4 - Additives
Trade Name Type Concentration Units Liauid Conc. Units
D-46 DEFOAMER 0.2C %BWOC
D-65 DISPERSANT 0.3C %BWOC
S1 ACCELERATOR 1.0C %BWOC
Printed: 8/16/2005 7:03:22 AM
e
e
ConocoPhillips.Alaska
Cementi ngReport
Page 3 of 3
Legal Well Name: CD2-31 PB1
Common Well Name: CD2-31PB1
Event Name: ROT - DRILLING
Report #:
Start:
1
6/5/2004
Spud Date: 6/5/2004
Report Date: 6/7/2004
End: 7/2/2004
Casing Test
Shoe Test
Liner Top Test
Test Press: 2,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: N
Pressure: (ppge)
Tool: N
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
LoglSurvey Evaluation
Interpretation Summary
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pumps - Switch to Dowell - Pumped 2 bbls
water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry (
AS lite3) @ 10.7 ppg - Observed nut plug marker @ sharkers w/375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to
switch to tail slurry
Mixed & pumped Tail slurry (G w/ .2% 0046, .3% D065, & 1 % S002) @ 15.8 ppg - Dropped top plug w/20 bbls water f/ Dowell - Switch
to rig pumps & displace cement w/228.4 bbls 9.6 ppg mud @ 7 B/M f/420 to 790 psi - slowed pumps to 3 1/2 B/M for last 18.4 bbls of
displacment - Bumped plug w/1100 psi - CIP @ 0053 hrs. - Full circulation throughout w/130 bbls. 10.7 ppg cement reutrns to surface
Printed: 8/1612005 7:03:22 AM
e
e
Page 1 of 3
ConocoPhiUips Alãskä,lnc.
DailyDrHlingR~port
.
WELL NAME JOB NUMBER EVENT CODE 24 HRS PROG TMD I TVD I DFS I REPT ~O. ¡DATE
CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 6/7/2004
SUPERVISOR I RIG NAME & NO. . FIELD NAME I OCS NO. AUTH MD DAILY TANG ¡CUM. TANGO
D. Burley / D. Mickey Doyon Driilina Inc 19 ALPINE 18,682.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD
Prep to test BOPE 0 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Test BOPE- PU DP - MU BHA#2 - RIH - FIT - Drill 8 1/2" hole 6/7/2004 205,298 581,605
LITHOLOGY I JAR iiRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
10034643
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST
6/7/2004 3,262.53 61.257 266.810 9.625 (in) (iù 3,302.0 (ft) 7.000 (in) (iù 13,737.0 (ft)
DENSITY(ppg) 9.60 I PP I ECDI MUD DATAl DAILY COST 1 0 I CUM COST I 0
FV PVIYP GELS I WLJHTHP I FCIT.SOL OILJWAT I %Sand/MBT I Ph/pM I Pf/Mf CI Ca I H2S I LIME I ES
300 34/82 42/95 I 7.4/ I 3/ / I 0.5/27.5 I 8.7/ ¡ 0.01/0 20 1 I I
BHA NO. I 1 I BHA I HOLE CONDITIONS I BIT NO. I 1
BHA WT.BELOW JARS I STRING WT. UP STRING WT. DN STRING WT. ROT I TORQUE / UNITS BHA LENGTH
24,568 I 140 120 130 I 8,500 ft-Ibf 977.28
ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. CONN SIZE CONN TYPE
Bit 1 1.00 12.250 4.500
Mud Motor 1 31.10 8.000 5.000
Sub - Float 1 2.47 8.000 2.870
Stabilizer 1 5.92 8.150 2.875
Crossover - Non Mag 1 2.44 8.140 2.875
MWD 1 9.17 8.020 3.500
MWD 1 8.70 8.020 1.920
MWD 1 9.90 8.090 1.900
Sub - Bottom Hole Orienting 1 3.00 8.100 2.813
Drill Collar - Non Mag 1 31.03 2.812 2.875
Drill Collar - Non Mag 1 31.03 8.062 2.880
Drill Collar - Non Mag 1 30.80 8.062 2.880
Crossover 1 3.02 6.750 2.780
Drill Pipe - Heavy Wgt 3 89.85 5.000 3.000
Jars 1 32.70 6.130 2.500
Drill Pipe - Heavy Wgt 23 685.15 5.000 3.000
BITS
BIT / RUN SIZE I MANUF. 1 TYPE I SERIAL NO. I JETS OR TFA I DEPTH IN DATE IN I I-O·D-L-B-G-O-R
1/ 1 12.250 I HUGHES-CHR I MX-C1 15044528 I 12/16/16/18// I 114.0 6/5/20041 1-1-WT-A-E-1-NO-TD
BIT OPERATIONS
BIT / RUN WOB I RPM I GPM I PRESS PBIT HRS I 24HrDIST I 24Hr ROP I CUM HRS CUM DEPTH I CUM ROP
1/ 1 20/30 I /80 I 656 I 2,600 673 1.04 I 149.0 I 143.27 I 21.56 3,198.0 I 148.33
SURVEY DATA
M.D. I INCL. I AZIMUTH I T.V.D.· I N/S CUM ¡EIW CUM SECTION M.D. I INCL.I AZIMUTH T.V.D. I N/S CUM ¡EIW CUMI SECTION
3,209.941 60.9271 268.03012,319.171 -59.691-1,807.4 1,678.38113,262.531 61.2571 266.810 2,344.60 I -61.761-1,853.411,720.90
PUMP I HYDRAULIC DATA
NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q(gpm) PRESS. (psi) TOTALQ KILL SPM / PRESSURE
1 Continental Emsco 12.000 6.000 75 317.26 2,600 655.67
2 Continental Emsco 12.000 6.000 80 338.41 2,600 655.67
Printed: 8/16/2005 7:02:23 AM
e
e
Page 2 of 3
ConocoPhilUps Alaska, Inc.
Daily ÐriUingReport
WELL NAME I JOB NUMBER I EVENT CODE 124 HRS PROG ITMD JTVD jDFS IREPT NO. I DATE
CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 3 I 6/7/2004
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 01:15 1.25 DRILL P DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD
WOB 20/30 k RPM 80 GPM 650 @ 2500 psi
String wt. PU 140 SO 120 Rot. 130
Torque on/off btm - 8,500/7,500 ft. Ibs.
ADT -1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs.
01:15 02:30 1.25 DRILL P CIRC SURFAC CBU @ 650 gpm / 2400 psi / 80 rpm, pumped 40 bbls low vis sweep and circ
hole clean.
02:30 04:15 1.75 DRILL P WIPR SURFAC Backream from 3312' to 2270' - 400 gpm /1120 psi /80 rpm. Circ BU to clean
hole while Backreaming from 2270' to 2175'.
04:15 05:30 1.25 DRILL P WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm /1100 psi /80 rpm. CBU
on last stand to clean up hole.
05:30 06:30 1.00 DRILL P WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'.
06:30 08:00 1.50 DRILL P CIRC SURFAC CBU - 675 gpm / 2600 psi / 80 rpm, pumped 40 bblls high vis sweep and circ
hole clean. Flow check well, static.
08:00 09:00 1.00 DRILL P TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-8K over, began pulling tight @
1650'.Worked up to 1640' with several attempts to 50k over.
09:00 11:00 2.00 DRILL Np DH TRIP SURFAC Backream from 1670' to 970' - 500 gpm /1400 psi /80 rpm. CBU on last stand
- heavy cuttings load back. Flow check well, static.
11:00 14:15 3.25 DRILL P PULD SURFAC Stand back hwdp and flex collars - lay down UBHO, mwd, stab, motor and bit.
Clean up trip mess and clear tools from rig floor.
14:15 15:15 1.00 CASE P RURD SURFAC RU to run 9 5/8" surface casing
15:15 15:30 0.25 CASE P SFTY SURFAC Held PJSM with crew.
15:30 21:00 5.50 CASE P RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st
I four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' -
Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running
csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jl. - Land casing
w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214'
21:00 22:30 1.50 CEMENTF CIRC SURFAC Rig down casing equipment - RU cmt head & lines - Circulate & condition for
cement job - ICP 300 psi @ 3 B/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125
22:30 00:00 1.50 CEMENT F PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for
marker w/ rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to
2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5
ppg - Mixed & pumped Lead slurry (AS Iite3) @ 10.7 ppg - Observed nut plug
marker @ sharkers w/ 375 bbls lead pumped - pumped 394 bbls total of lead
slurry - Prep to switch to tail slurry
24 HR SUMMARY: Drill 12 1/4" hole f/3162' to 3312' MD - Pump sweep & circulate hole clean - Wiper trip to 1670' -RIH - pump sweep and
circ clean- POOH, lay down BHA - RU and Run 9 5/8" casing.- Cmt csg.
PERSONNEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhillips Company 1 Halliburton - Sperry-Sun 2
Fairweather E&P Service 1 Halliburton - Sperry-Sun 1
Doyon Drilling Inc 27 M-I Drilling Fluids 3
Arctic Catering Inc. 5 Swaco 4
Dowell 2 FMC Corporation Wellhe 1
Halliburton - Sperry-Sun 2
Printed: 811612005 7:02:23 AM
e
e
Page 3 of 3
ConocoPhiUips Alaska,lnc.
Daily DriUing Report
WELL NAME I JOB NUMBER! EVENT CODE 24 HRS PROG ·!TMD ITVD DFS I REPT ~O. JDATE
CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 6/7/2004
MATERIALS 1 CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
Fuel gals 1,344 -3,815 Water, Potable bbls 120 -360
Water, Drilling bbls 350 -3,370 Fuel, Camp gals
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME I ZONE I TOP BASE I COMMENTS
CD2-12 I CD2-31 I 933 3.5 11440
Printed: 8/16/2005 7:02:23 AM
·---
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Well Name: I CD2-31 I Rig: Doyon 19 Date: 6/9/2004 Volume Input Volume/Stroke Pump Rate:
Drilling Supervisor: Burley / Mickey Pump used: I #2 Mud Pump I... Strokes .... 0.1000 Bbls/Strk .... 6.0 Strk/min ...
Type of Test: I OpenholeTest LOT/FIT I... Pumping down I annulus and DP. I...
Casin Test Pressure Integrity Test
Hole Size: 18-1/2" I... Casing Shoe Depth I I Hole Depth PumpinQ Shut-in Pumping Shut-in
RKB-CHF:I 36.71Ft 3,302 IFt-MD 2,367Ft-TVD I 3.332 I Ft-MD I 2,378IFt-TVD Strks psi Min psi Strks psi Min psi
Casina Size and DescriDtion: 19-5/8" 36#/Ft J-55 BTC 1...1 0 0 0 2500 0 0 0 800
Casino Test Pressure InteoritvTest 2 50 1 2500 2 60 0.25 650
Mud Weight: 9.6 ppg Mud Weight: 9.5 ppg 4 150 2 2500 4 205 0.5 610
Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2 6 300 3 2500 6 400 1 580
Test Pressure: 2,500 psi Rotating Weight: 115.000 Lbs 8 500 4 2500 8 600 1.5 570
Rotating Weight: 75,000 Lbs Blocksrrop Drive Weight: 75,000 Lbs 10 700 5 2500 10 750 2 560
Blocksrrop Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg 12 900 6 2500 12 850 2.5 55
Estimates for Test: 2.4 bbls Estimates for Test: 1046 psi 1 bbls 14 1100 7 2500 14 870 3 550
1"'[ ... 16 1240 8 2500 16 900 3.5 545
EMW = Leak-off Pressure + Mud Weight = 850 2367 + 9.5 PIT 15 Second 18 1400 9 2500 18 4 540
0.052 x TVD 0.052 x Shut-in Pressure, psi 20 1550 10 2500 20 4.5 540
EMW at 3302 Ft-MD (2367 Ft-TVD) = 16.4 ppg 650 22 1700 15 2500 5 540
3000 ~,tO ~d~"g œ" ~1~1 24 1900 20 2500 5.5 540
--~--- ._...~------ -- of test pressure. 26 2050 25 2500
- 6 540
-- 28 2250 30 2500 6.5 535
-- --
2500 -- -------- .. -- .."..,,,. .."...". . 30 2450
-- ---- 7 530
.----------.--. -- , .._--~ 31 2500 7.5 520
Æ --------
----- --- AC"·- -------_._-~ ~- -~ -- .-- 8 515
2000 -- --- .I' I----- -_._~ - --
w "" .-----.-- 8.5 515
a::: ~- , -_o- f----- r-- -. -~'-_.. 9 515
-- f---------- r--. ---
::;) ..,.. -- I--~- 9.5
U) 1500 r--------- ,---- ----~-- .-- 515
U) .- -- 10 510
w f-
a::: - --
f---
Q. .I" - --
1000 ¡-----. "" -- --
I-- ., - -- I--
jjJf .- ---
-- -- -_.'_.._--~ -~ rt\:::
--- - -- \ f ..., I \:.- .
500 .--
-I" , ( .
~ -- -- JJ ,"11& 11\
~ -- -- ".", "'- Il"'Yi
-.---.- ~" í\
--
0
0 1 2 3 4 0 5 10 15 20 25 30
Barrels Shut-In time, Minutes Volume Volume Volume Volume
.......CASING TEST -LEAK-OFF TEST 0 PIT Point Pumped Bled Back Pumped Bled Back
3.1 Bbls IBbls 2.0 Bbls Bbls
Comments: Tested 9 5/8" casing after bumping plugs on cement job.
e
e
Conoc6Phillips
Casing Detail
7" Casina
Well:
Date:
CD2-31
6/19/2004
DEPTH
Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS
Doyon 19 RKB to Landing Ring 34.84
FMC Gen V Hanger 2.40 34.84
Jts 3 to 321 319 Jts 7" 26# L-80 BTCM Csg 13471.62 37.24
Davis Lynch Float Collar 1.30 13508.86
Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 86.15 13510.16
Ray Oil Tools "Silver Bullet" Float Shoe 2.10 13596.31
13598.41
TD 8 1/2" Hole 13608.00
Total Centralizers: 94
Straight blade centralizer one per jt on jts # 1-14
Straight blade centralizer one per jt on jts. # 243, 244, 245
Straight blade centralizer one per jt on every other joint
Starting @ # 247 to # 279
Straight bla.de centralizer 2 per jt on jts 282 - 303 wI stop
collars
Straight blade centralizer one per jt on jts # 303 - 319 **
-
330 joints in shed - 321 total jts. to run
Last 9 jts. out
Use Best-a-Life 2000 pipe dope
Remarks: Up Wt - 350.+ k
Dn Wt - 145'k
Block Wt - 75k
,
** Did not install stop rings on jts #304 - 319 due to csg trying to stick in hole. Only 1 cent per jt.
Supervisor: D. Lutrick / L. Hill
e
e
ConocoPhillips Alaska Page 1 of 3
; Cementing Report
Legal Well Name: CD2-31 PE.1 Spud Date: 6/5/2004
Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004
Event Name: ROT - DRILLING Start: 6/5/2004 End: 7/2/2004
Cement Job Type: Primary
Primary Saueeze Open Hole Saueeze Casino Plug
Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 13,598 (ft) sa TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 6/19/2004 sa Cate: Date Set: BTM set: (ft)
Csg Type: Production Casing sa Týpe: Csg Type: Plug Date:
Csg Size: 7.000 (in.) sa TMD: Plug Type:
sa Date: Drilled Out:
Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: Dowell Schlumberger Cementer: Jim Thompson Pipe Movement:
Pipe Movement
Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf)
Rec Time Start: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs)
Stage No: 1 of 1
Type: Cement Casing Start Mix Cmt: 03:38 Disp Avg Rate: 7.00 (bbl/min) Returns: 100
Volume Excess %: 40.00 Start Slurry Displ: 03:38 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl)
Meas. From: N/A Start Displ: 03:50 Bump Plug: Y Cmt Vol to Surf: (bbl)
Time Circ Prior End Pumping: 05:05 Press Prior: 900 (psi)
To Cementing: End Ij'ump Date: 6/19/2004 I Press Bumped: 1,400 (psi) Ann Flow After: N
Mud Circ Rate: 294 (gpm) Top Plug: Y I Press Held: 1,400 (min) Mixing Method: Tub
Mud Circ Press: 1,000 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densometer
Mud Data
Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 40 (s/qt) PVIYP: 8 (cp)/16 (lb/100ft2) Gels 10 see: 8 (lb/100ft2) Gels 10 min: 11 (lb/100ft2)
Bottom Hole Circulating Temperature: (OF:, Bottom Hole Static Temperature: (OF)
Displacement Fluid Type:Mud Density: 9.8 (ppg) Volume: 516.00 (bbl)
, Stage No: 1 Slurry No: 1 of 3
Slurry Data
Fluid Type: FLUSH Description: CW 1 00 Class: Purpose: Chemical was
Slurry Interval: (ft) To: (ft) Cmt Vol: 20.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk) Mix Water: (gal)
Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N
Test Data Time Temp Pressure
Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi)
Free Water: (%) Temperature: ("F) Compressive Strength 2: ("F) (psi)
Fluid Loss: (cc) Temperature: (OF)
Fluid Loss Pressure: ("F) .'
,
Printed: 6/16/2005 7:03:47 AM
e
e
ConocoPhillips Alaska
Cerraenting.Report
Legal Well Name: CD2-31 PB1
Common Well Name: CD2-31PB1
Event Name: ROT - DRILLING
Slurry Data
Fluid Type: FLUSH
Slurry Interval: (ft) To: (ft)
Water Source:
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Slurry Data
Fluid Type: TAIL
Slurry Interval: 13,598.00 (ff)o:
Water Source: lake water
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Trade Name
D-65
B-155
D-46
0-167
Report #:
Start:
3
6/5/2004
Stage No: 1 Slurry No: 2 of 3
Page 2 of 3
Spud Date: 6/5/2004
Report Date: 6/19/2004
End: 7/2/2004
Description: MUDPUSH XL Class:
Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ff'/sk)
Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0
Temperature: (OF)
Temperature: (OF)
Temperature: ("F)
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No: 30f 3
Description:
12,126.00 (ft~mt Vol: 47.0 (bbl)
Slurry Vol230 (sk)
Temperature: (OF)
Temper:3ture: ("F)
Temperature: (OF)
Temp
(OF)
(OF)
Class: G
Density: 15.80 (ppg) Yield: 1.16 (ft3/sk)
Water Vol: 27.8 (bbl) Other Vol: 0
Time
Compressive Strength 1:
Compressive Strength 2:
Stage No: 1 Slurry No: 3 of 3 - Additives
Tvpe
DISPERSANT
retarder
DEFOAMER
Fluid loss
..
I
Concentration Units
0.3C %BWOC
0.01 %BWOC
0.2C %BWOC
OAC %BWOC
Temp
(OF)
(OF)
Liquid Conc.
!
Purpose: SPACER
Mix Water: (gal)
Foam Job: N
Pressure
(psi)
(psi)
Purpose: PRIMARY
Mix Water: 5.09 (gal)
Foam Job: N
Pressure
(psi)
(psi)
Units
Printed: 811612005 7:03:47 AM
e
e
ConocoPhillips Alaska
Cementing Report
Page 3 of 3
Legal Well Name: CD2-31 PE1
Common Well Name: CD2-31PB1
Event Name: ROT - DRILLING
Report #:
Start:
3
6/5/2004
Spud Date: 6/5/2004
Report Date: 6/19/2004
End: 7/2/2004
.
Casing Test
Shoe Test
Liner Top Test
Test Press: (psi)
For: (min)
Cement Found between
Shoe and Collar:
Pressure: (ppge)
Tool:
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool:
Tool:
Tool:
Log/Survey Evaluation
Interpretation Summary
CBL Run:
Under Pressure: (psi)
Bond Quality:
Cet Run:
Bond Quality:
Temp Survey:
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient:
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required:
Number of Remedial Squeezes:
Remarks
Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8
cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug. Check floats OK. Test csg to
3500 psi.
Printed: 811612005 7:03:47 AM
e
e
Page 1 of 1
ConocoPhillips Alaska, Inc.
Daily Drilling Report
WELL NAME JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS REPT NO. DATE
CD2-31 ODR 13,608.0 7,342.0 13.25 14 6/18/2004
SUPERVISOR RIG NAME & NO. FIELD NAME / OCS NO. AUTH MD _IDAlLYTAN~ CUM. TANG
Donnie Lutrick I Larry Hil Doyon Drilling Inc 19 ALPINE 18,682.0 0
CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD
Rig down after cement job. 0 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD
Run 7". Cement 7". Test BOP. 6/14/2004 87,503 2,379,807
LITHOLOGY JAR HRS OF SERVICE BHA HRS SINCE INSP I LEAKOFF AFE AUTH.
FINE SAND 16.38 10034643
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST
6/16/2004 13,533.65 80.320 318.950 9.625 (in) @ 3,302.0 (ft) 7.000 (in) @ 13,737.0 (ft) 6/14/2004
DENSITY(ppg) 9.80 I PP I ECD19.80 IMUD DATAl DAILY COST I 0 CUM COST 0
FV PVNpl GELS WUHTHP FCiT.SOL OIUWAT I %SandIMBT I Ph/pM I Pf/Mf I CI I Ca H2S I LIME I ES
42 7/20 I 8/12 4.0/7.2 11 I I 0.2118.0 I 9.01 I 0.05/2 I I 4 I I I
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
00:00 02:15 2.25 CASE P RUNC INTRM1 Rih wI 7" csg from 250' to 3261'.
02:15 02:45 0.50 CASE P CIRC INTRM1 Circ 1 csg volume at 5 bpm at 310 psi.
02:45 03:30 0.75 CASE T EQIP OTHR INTRM1 Change out Franks fill up tool. Cup was leaking.
03:30 07:45 4.25 CASE P RUNC INTRM1 RIH wI 7" csg from 3261' to 7590'.
07:45 08:45 1.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. On wt - 120k.
08:45 13:00 4.25 CASE P RUNC INTRM1 RIH wI 7" csg from 7590' to 11,816'.
13:00 15:00 2.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. On wt - 145 k.
15:00 00:00 9.00 CASE P RUNC ·INTRM1 RIH wI 7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight
460 K up and All of weight down to make a few feet at a time. Attempts to
circulate tried to pack off.
24 HR SUMMARY: Ran casing from 250' to 13515'.
PERSONNEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhillips Company 1 Halliburton - Sperry-Sun 2
Fairweather E&P Service 1 Halliburton - Sperry-Sun
Doyon Drilling Inc 27 M-I Drilling Fluids 3
Arctic Catering Inc. 5 Swaco 4
Dowell 2 FMC Corporation Wellhe 1
Halliburton - Sperry-Sun 2 I
MATERIALS I CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
Fuel gals 750 9,075 Water, Potable bbls 120 680
Water, Drilling bbls 250 820 Fuel, Camp gals 2,080
RESERVOIR ANDINTERVALDAT A
RESERVOIR NAME I ZONE I TOP BASE I COMMENTS
CD2-36 I Cd2-31 1 20 2 11470
Printed: 6/16/2005 7:02:43 AM
e
e
Page 1 of 2
CD2-31
SUPERVISOR I RIG NAME & NO.
Donnie Lutrick I Larry Hill Doyon Drilling Inc 19
CURRENT STATUS
ConocoPhillipsAlaska, Inc.
Daily DrilHngReport
JOB NUMBER ¡EVENT CODE 124 HRS PROG TMD I TVD ¡ DFS
ODR 13,608.0 I 7,342.0 I 14.25
I FIELD NAME I OCS NO. AUTH MD DAilY TANG
1 ALPINE 18,682.0 0
ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD
IREPT NO. 10ATE
15 16/19/2004
¡CUM. TANGO
CUM INTANG WI MUD
o
CUM COST WI MUD
2,829,390
WEll NAME
Circulating prior to doing FIT. 0
24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL
FIT. Change out mud system to MOBM and drill. 6/14/2004 449,583
LITHOLOGY ¡JAR HRS OF SERVICE BHA HRS SINCE INSP IlEAKOFF AFE
FINE SAND 16.38 10034643
LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING
6/16/2004 13,533.65 80.320 318.950 i 7.000 (in) @ 13,598.0 (ft) 4.500 (in) CW
DENSITY(ppg) 9.80 I PP I ECD 19.80 I MUD DATAl DAlLYCOST I 0
FV PVlYP GELS WUHTHP I FC/T.SOL OIUWAT I %SandlMBT I Ph/pM I Pf/Mf I
40 8116 8/11 5.2/7.2 I 11 I I 0.2/15.0 I 9.01 I 0.05/2 I
AUTH.
LAST BOP PRES TEST
18,682.0 (ft) 6/19/2004
I CUM COST I 0
CI I Ca I H2S I LIME I ES
I 4 I ¡ I
BHA NO. I 4 I BHAI HOLE CONDITIONS I BIT NO. I 4
BHA WT.BELOW JARS STRING WT~ UP STRING WT. ON I STRING WT. ROT I TORQUE I UNITS BHA LENGTH
I I 376.78
ITEM DESCRIPTION NO JTS LENGTH O~D. 1.0. CONN SIZE CONN TYPE
Bit 1 0.75 6.125 2.250
Motor 1 32.48 4.974 2.794
6" Stab 1 5.53 4.790 2.256
Sub - Float 1 2.40 4.625 2.250
MWD 1 8.56 4.720 2.625
MWD 1 24.47 I 4.750 1.250
MWD 1 10.86 4.700 1.250
MWD 1 11.01 4.630 2.815
NM Flex DC's 3 93.84 4.700 2.250
Crossover 1.16 4.770 2.625
3 X HWDP 3 91.95 3.500 2.060
Jar DNT 32.46 4.750 2.000
2 X HWDP 2 61.31 3.500 2.063
BIT I RUN
41 4
BITS
SIZE I MANUF. I TYPE I SERIAL NO. I JETS OR TFA
6.125 I HUGHES-CHR IHC 306 17102089RB I 12/12/13/13/13/13
I DEPTH IN DATE IN I I-O-D-L-B-G-O-R
113,608.0 6/19/20041 1-1-CT-M-D-I-EC-TD
BIT! RUN
BIT OPERATIONS
WOB I RPM J GPM I PRESS I P BIT I HRS I 24Hr DIST I 24Hr ROP CUM HRS CUM DEPTH I CUM ROP
FROM TO
00:00 00:30
HOURS
0.50
CODE
CASE P
TROUBLE SUB
RUNC
OPERATIONS SUMMARY
PHASE
INTRM1
DESCRIPTION
Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and
landed casing @ 13598'.
Rigged down fill up tool and made up cement head and lines.
Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure
and flow stabilized. Final circulating pressure 1000 PSI @ 7 BPM with full
returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back
on hanger. PJSM for cement job.
Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls
12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug.
Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped
plug with 1400 PSI. Check floats OK. CIP @ 0505Hrs. 6/19/04.
00:30 01:00 0.50 CASE P RURD INTRM1
01:00 03:15 2.25 I CEMENT F CIRC INTRM1
I I
I
03:15 05:15 2.00 CEMENT F PUMP INTRM1
Printed: BJ16/2005 7:02:58 AM
e
e
Page 2 of 2
ConocoPhillips Alaska, Inc.
Dêlily DrilUngReport
WELL NAME I JOB NUMBER EVENT CODE 124 HRS PROG TMD ¡TVD IDFS I REPT NO. DATE
CD2-31 ODR 13,608.0 7,342.0 14.25 15 6/19/2004
OPERATIONS SUMMARY
FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION
05:15 06:00 0.75 CASE P MIT INTRM1 Rigged up and tested casing 3500 PSI for 30 miniutes.
06:00 06:45 0.75 CASE P RURD INTRM1 Rigged down cement and casing tools.
06:45 07:45 1.00 CASE P DEQT INTRM1 Laid down landing joint. Installed and tested packoff.
07:45 08:45 1.00 WELCTL F EQRP INTRM1 Changed out rams from 7" to VBR.
08:45 13:00 4.25 WELCTL F BOPE INTRM1 Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke lines,
kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP
to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing
tests. Pull test plug and install wear bushing.
13:00 13:30 0.50 DRILL P RIRD INTRM1 Picked up bales and elevators.
13:30 17:30 4.00 DRILL P PULD INTRM1 Made up BHA and RIH. Shallow tested MWD.
17:30 20:30 3.00 DRILL P ., PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'.
20:30 00:00 3.50 DRILL P TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'.
24 HR SUMMARY: Ran and landed casing at 13598'. Circulated. Cemented casing. Tested casing to 3500 PSI. Rigged down tools and tested
BOP. Made up and RIH with BHA and 150 Jts. DP from pipe shed. RIH with DP from derrick to 12500'.
PERSONNEL DATA
COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
ConocoPhillips Company 1 Halliburton - Sperry-Sun
Fairweather E&P Service 1 M-I Drilling Fluids 3
Doyon Drilling Inc 27 Swaco 4
Arctic Catering Inc. 5 FMC Corporation Wellhe 1
Dowell 2 ASRC Energy Services ( 2
Halliburton - Sperry-Sun 2 Epoch Well Services Inc 2
Halliburton - Sperry-Sun 2
MATERIALS I CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
Fuel gals 560 8,515 Water, Potable bbls 120 960
Water, Drilling bbls 950 1,070 Fuel, Camp gals 2,080
RESERVOIR AND INTERVAL DATA
RESERVOIR NAME ZONE TOP BASE COMMENTS
CD2-36 Cd2-31 1449 3.5 1420
CD2-31 CD2-31 392 4.3 1400
Printed: 8/16/2005 7:02:58 AM
PRESSURE INTEGRITY TEST
CONOCOPHILLlPS Alaska, Inc.
Nell Name: I C02 -31 TRig: Doyon 19 Date: 6/19/2004 Volume Input Pump Rate:
Drilling Supervisor: Lutrick I Hill Pump used: I Cement Unit I.... ~ ~ 0.8
Barrels Bbls/Strk Bbl/min .....
Type of Test: \ Annulus Leak Off Test for Disposal Adequacy I ... I Pumping down I annulus. I...
Casin Test Pressure IntearitvTest
Hole Size: 18-1/2" I... Casina Shoe Depth I I Hole Depth Pumping Shut-in Pumping Shut-in
RKB-CHF: I 34.8 Ft I 3,302 1Ft-MOl 2,367IFt-TVD I 12,1261Ft-MD 6,8281 Ft-TVD I Bbls psi Min psi Bbls psi Min psi
Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC I.... 0.5 25 0 480
Chanaes for Annular Adeauacv Test Pressure IntearitvTest 1 56 0.25 460
)uter casing shoe test results in comments Mud Weight: 9.8 ppg 1.5 86 0.5 450
Description references outer casing string. Inner casing 00: 7.0 In. 2 116 1 444
i¡ze is that drilled below outer casing. 2.5 147 1.5 444
;timated TOC for Hole Depth. 3 177 2 444
Enter inner casing OD at right Desired PIT EMW: 15.5 ppg 3.5 212 2.5 439
Estimates for Test: 702 psi 0.8 bbls 4 242 3 439
1...1 ... 4.5 268 3.5 439
EMW = Leak-off Pressure + Mud Weight = 606 2367 + 9.8 PIT 15 Second 5 298 4 439
0.052 x TVD 0.052 x Shut-in Pressure, psi 5.5 328 4.5 434
EMW at 3302 Ft-MD (2367 Ft-TVD) = 14.7 460 6 353 5 434
1000 - 6.5 384 5.5 429
7 409 6 429
~---_._- ------- --~_.~---- f----~-~ ~~- -- e-- ~ ~0- 7.5 434
6.5 429
--~-- 8 464 7 429
r\~ ~ 8.5 485 7.5 424
Ah. . .C
----- ---~_._- _c. -- -_._~- --- ---1 ~, - 9 510 8 424
Ll j}-- ....\, ,
IiiIi\ ~ 9.5 540 8.5 424
w ---
0::: -' ........ ,/ 10 560 9 419
::) ~-
(/) 500 f--- - " -.- -----~ ----- -- 10.5 586 9.5 419
(/) ..¡; .. \"'", 11 606 10 419
w . ,..
0::: ".- -- c- 11.5 555
---- ,¡r k~ ~
Q. ~ f"2.. .-::1~
12 520
,.,- -- ~---- ----.--..- ---~ ~ -~ ~Jf 12.5 515
~ 13 515
-- . ,.. --- ---.-.---.-- -~ , 1;& -\\ <
\ 13.5 525
14 530
... --- --------- ---
14.5 535
0
0 2 4 6 8 10 12 14 16 0 5 10 15 20 25 30
Barrels Shut-In time, Minutes Volume Volume Volume Volume
........CASING TEST _LEAK-OFF TEST 0 PIT Point Pumped Bled Back Pumped Bled Back
0.0 Bbls IBbls 14.5 Bbls ItsDls
Comments: 9 5/8 LOT = 16.4 PPG EMW
12/20104
Schlumberger
NO. 3287
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
~,.
(b
¡~~'
\~-
-)If-
\q~
¡.rf>
~
\~
e 0 OQ escnptlon ate ue me rm s
~ L5-05 10662986 RST-SIGMA 01/28/04 1 1 /"?c ?-ð(¡,CY
\5~ L3-02 10679068 RST -SIGMA 04/03/04 1 1 ?G-/:J1f
L3-02 10900108 RST -SIGMA 10/29/04 1 1 I ~ -/3'(
fÞ'\~ L5-05 10674383 RST -SIGMA 10105/03 1 1 It ÌI 7-CXd1
.~ DS 06-23B 10715411 MCNL 06/15/04 1 1 ~ 0'(- m
,vV 02-06A 10621750 SCMT 12/01/03 1 I rt:. -I Ji'
-~~ Z-39 10900123 PROD PROF W/DEFT 11/27/04 1 .2l~ -:ztn
1-¡¿ W-17 10889187 TEMPERATURE PROFILE 11/08/04 1 ... Q' _0_
~ 02-29C 10889185 DOWN HOLE SAMPLE LOG 11/07/04 1 2. 0'1- 05'1
,~ X-04 10919925 PROD PROF WIDEFT 12/15/04 1 / 79- ðl?-'t
'1;%'I¡ W-31 10877807 PROD PROF W/DEFT/GHOST 12/15/04 1 /~/Ycf
WII
J b #
L D
D
BI r
Color
p' t
CD
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
/þ;ts-
/
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, 99503-2
ATTN' eth
Date Delivered:
.
-~r,f-"fIi ¡..
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Robin Deason
333 West 7ili Avenue, Suite 100
Anchorage, Alaska 99501-3539
RE: MWD Formation Evaluation Logs: CD2-31 PBl,
/?-~~~
RECEIVED
0rD rì () {';I"04
0D L 0 1...\.1
.. ¡'~¢1¡'"" ("Iii X. Gas Cons, Comrmssíof!
\¡?)oilr-.¡C")' ;J __ i.,.~
R.f¡r;\1orage
September 14, 2004
AK-MW-3109992
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of
Rob Kalish, Sperry-Sun, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted CD Rom with verification listing.
API#: 50-103-20493-70.
~
.~
11/o~
RECEIVE~
.
~o <f-o 'ðl-
/zr;'i~
C;r.D :) p 00 ì4
vt.....l t.. ¡) I: 0
'l1¡jska Oil & GM C . C '. WELL LOG TRANSMITTAL
d~ ons. ommiSS!Of
Anr.horage
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: 1tub~1f DUi:18ft
333 West 7tll Avenue, Suite 100
Anchorage, Alaska 99501-3539
September 14,2004
RE: MWD Formation Evaluation Logs: CD2-3],
AK-MW-3109992
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Speny-Sun, 6900 Arctic Blvd., Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-103-20493-00.
d~J.aJ~
I ð¡;- f t(
.
~
ConocoPhillips
.
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
September 29,2004
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West ¡th Avenue Suite 100
Anchorage, Alaska 99501
RECEIVED
SEP 2 9 2004
Alaska Oil & Gas Cons. Commission
Anchorage
Subject: Well Completion Report for CD2-31 / CD2-31 PB1 (APD 204-082)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD2-31 / CD2-31 PB1.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
4 c-~ 0tZ-
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCA/skad
OR\G\NAL
· STATE OF ALASKA ..
ALA Oil AND GAS CONSERVATION COM~ON
R,EtË'VED
tH,P 2 9 2004
WELL COMPLETION OR RECOMPLETION REPORT A ",-.0(1
1a. Well Status: Oil 0 Gas U Plugged 0 Abandoned 0 Suspended 0 WAG 0 1b}Wèû:tilaM!' ';¡e,""'" - .'
20AAC 25.105 20AAC 25.110 Development 0" nc!1OfªWfuratory 0
GINJ 0 WINJ 0 WDSPL 0 No. of Completions _ Other _ Service 0 Stratigraphic Test 0
2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number:
./
ConocoPhillips Alaska, Inc. or Aband.: July 2,2004 204-082 I
3. Address: 6. Date Spudded: 13. API Number.
P. O. Box 100360, Anchorage, AK 99510-0360 June 5, 2004 , 50-103-20493-00 I 50-103-20493-70
4a. Location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number:
/ CD2-31I CD2-31 PB1
Surface: 1875' FNL, 1526' FEL, Sec. 2, T11N, R4E, UM June 24, 2004
At Top Productive 8. KB Elevation (It): 15. Field/Pool(s):
Horizon: 1746' FNL, 1450' FEL, Sec. 4, T11N, R4E, UM 36.9' RKB I 52.8' AMSL Colville River Field
Total Depth: 9. Plug Back Depth (MD + TVD): Alpine Oil Pool
2902' FNL, 3804' FEL, Sec. 33, T12N, R4E, UM 18131' MD 17311' TVD
4b. Location of Well (State Base Plane Coordinates): / 10. Total Depth (MD + TVD): 16. Property Designation:
/
Surface: x- 371713 ,¡ y- 5974483 Zone-4 I 18131' MD 17311' TVD ADL 380075, 387207, ASRCNPR1
TPI: x- 361234 y- 5974798 Zone- 4 11. Depth where SSSV set: 17. Land Use Permit:
Total Depth: x- 358947 y- 5978965 Zone-4 SSSV @ 2307' ALK NIA
18. Directional Survey: Yes 0 NoU 19. Water Depth, if Offshore: 20. Thickness of
NIA feet MSL Permafrost: 1795' MD
21. Logs Run:
G RIRes/Dens/Neu
22. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CASING SIZE CEMENTING RECORD PULLED
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE
16" 62.5# H-40 36.9' 109' 36.9' 109' 42" pre-installed
9.625" 36# J-55 36.9' 3302' 36.9' 2364' 12.25" 507 sx AS Lite, 240 sx Class G
7" 26# L-80 36.9' 13598' 36.9' 7339' 8.5" 230 sx Class G
4.5" 12.6# L-80 12688' 18119' 7096' 7311' perf'd pups 1 per 4 jts
sidetrack plug from 12745'-13245'
23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD
Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET
4.5" I 3.5" 12679' 12629'
13811 '-14850' MD 7348'-7336' TVD * ./
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
15245'-18073' MD 7325'- 7311' TVD * DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
12745'-13245' 195 sx Class G
7980'-8480' 253 sx Class G (sidetrack plug)
. 1 perf'd pup every 4 jts of blank w/(8) 1/2" holes
26. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lilt, etc.)
August20,2004 Gas Lift Oil
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
9/4/2004 6 hours Test Period --> 1059 742 0 74% 886
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - API (corr)
press. 247 psi 1241 24-Hour Rate -> 3733 3309 0 not available
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
!';:',;c': c;,,·
u' ,,' ..._
'1.\ -,~
NONE .2:2. ~'<2.i
VE-~i j ¿:; E r:"
ORIGI~~I~L -~--_.
0P'G
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
f~Bfl
~~
OCT06~
28.
29.
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None'.
CD2-31
Seabee Formation
Nanushuk
Gamma Ray Shale
Kalubik
Kuparuk Formation
Miluveach
Top Alpine 0
Top Alpine C
Base Alpine C
TO
not present
6210'
12271'
12649'
12724'
12810'
12958'
12986'
13110'
18131 '
3838'
6903'
7027'
7058'
7089'
7135'
7143'
7230'
7311'
NIA
RECE\VE,Q
SEP'2 9 1004 .
'"' ''''I· "stOr.
. G COilS. \,;om,¡, '" .
A\aska 0'\ & as
þ.t"Ichorage
CD2-31 PB1
TO
13245'
7429'
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Vern Johnson @ 265-6081
Printed Name C. Alvord
Signature -A-..( .(),Á..
Title:
Phone
Alcine Drillina Team Leader
2<.,.s- - (¡, 1"l..O
Date ~L (2.- \ ( @e¡....
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRilLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/5/2004 00:00 - 04:00 4.00 MOVE MOVE MOVE Moving rig fl C02-57 to CD2-31 - Move ball mill - PJSM - Move pit &
motor complex - Skid derrick & floor over sub - retract feet - move sub
off C02-57 - tum tires - lay mats for sub move.
04:00 - 09:00 5.00 MOVE MOVE MOVE Move rig to well slot CD2-31, spot and level subbase. Skid rig floor to
drill position - move in pits & motor complexes- spot pipe shed. Hook up
sevice lines, highline power on @ 0845 hrs. Accepted rig @ 0900 hrs.
09:00 - 11 :00 2.00 MOVE RURD MOVE NU riser and flowline, take on spud mud and rig up.
11 :00 - 12:00 1.00 MOVE RURD MOVE Move BHA components to rig floor - MU motor and bit.
12:00 - 13:30 1.50 RIGMNT RSRV MOVE Cut and slip drilling line - service rig.
13:30 - 14:30 1.00 MOVE RURD MOVE MU HWDP on top of motor - fill conductor with mud - check for leaks -
test mud lines to 3000 psi. - Drill out ice plug and clean out conductor
from 40' to 114'.
14:30 - 16:00 1.50 MOVE RURD MOVE MU BHA - scribe tools and initiate MWD tools.
16:00 - 16:15 0.25 MOVE SFTY MOVE Held Pre-Spud meeting with Drilling Crew and Rig Team.
16:15 - 16:30 0.25 MOVE RURD MOVE MU 8" flex collars and wash down to 114'.
16:30 - 00:00 7.50 DRILL DRLG SURFAC Spud well @ 1630 hrs - Drill 12 1/4" hole from 114' to 758' MD -754'
TVD
WOB 10/25 k RPM 0170 GPM 420 @ 950 psi
String wt. PU 110 SO 110 Rot 110
ADT - 3.0 hrs. = ART - .8 hrs. AST - 2.2 hrs.
6/6/2004 00:00 - 12:00 12.00 DRILL DRLH SURFAC Drill 12 1/4" hole from 758' to 2305' MD 1868' TVD
WOB 10/35 k RPM 70 GPM 630 @ 1880 psi
String wt. PU 135 SO 125 Rot 130
Torque onloff btm - 7,50017,500 Wlbs
Total ADT 8.9 hrs = ART - 4.21 hrs AST - 4.69
12:00 - 00:00 12.00 DRILL DRLG SURFAC Drill 12 1/4" hole from 2305' to 3162' MD 2296' TVD
WOB 15/35 k RPM 80 GPM 650 @ 2500 psi
String wt. PU 135 SO 115 Rot. 125
Torque onloff btm - 9,000/8,000 ft. Ibs.
ADT - 8.62 hrs.= ART - 7.35 hrs. AST - 1.27 hrs.
6/7/2004 00:00-01:15 1.25 DRILL DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD
WOB 20/30 k RPM 80 GPM 650 @ 2500 psi
String wt. PU 140 SO 120 Rot. 130
Torque on/off btm - 8,50017,500 ft. Ibs.
ADT - 1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs.
01:15 - 02:30 1.25 DRILL CIRC SURFAC CBU @ 650 gpm 12400 psi I 80 rpm, pumped 40 bbls low vis sweep
and circ hole clean.
02:30 - 04:15 1.75 DRILL WIPR SURFAC Backream from 3312' to 2270' - 400 gpm 11120 psi 180 rpm. Circ BU to
clean hole while Backreaming from 2270' to 2175'.
04:15 - 05:30 1.25 DRILL WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm 11100 psi I 80
rpm. CBU on last stand to clean up hole.
05:30 - 06:30 1.00 DRILL WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'.
06:30 - 08:00 1.50 DRILL CIRC SURFAC CBU - 675 gpm 12600 psi 180 rpm, pumped 40 bblls high vis sweep
and circ hole clean. Flow check well, static.
08:00 - 09:00 1.00 DRILL TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-8K over, began pulling
tight @ 1650'.worked up to 1640' with several attempts to 50k over.
09:00 - 11 :00 2.00 DRILL TRIP SURFAC Backream from 1670' to 970' - 500 gpm 11400 psi /80 rpm. CBU on
last stand - heavy cuttings load back. Flow check well, static.
11 :00 - 14:15 3.25 DRILL PULD SURFAC Stand back hwdp and flex collars - lay down UBHO, mwd, stab, motor
and bit. Clean up trip mess and clear tools from rig floor.
14:15 - 15:15 1.00 CASE RURD SURFAC RU to run 9 5/8" surface casing
15:15 - 15:30 0.25 CASE SFTY SURFAC Held PJSM with crew.
15:30 - 21 :00 5.50 CASE RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts.
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
5.50 CASE RUNC SURFAC (BakerLoc 1 st four connections - fill pipe - circ & check floats) . 36 jts.
(40 total) to 1624' . Circulate btms up 4 bbls/min @ 260 psi - PU 130
SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU
hanger & landing jt. - Land casing wI FMC fluted hanger wI shoe @
3302' - FC @ 3214'
1.50 CEMEN CIRC SURFAC Rig down casing equipment - RU cmt head & lines - Circulate &
condition for cement job - ICP 300 psi @ 3 B/M - FCR - 270 psi @ 6
B/M - PU 150 SO 125
1.50 CEMEN PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wI nut
plug for marker wI rig pumps - Switch to Dowell - Pumped 2 bbls water
- Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls
Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry ( AS lite3) @
10.7 ppg - Observed nut plug marker @ sharkers wI 375 bbls lead
pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail
slurry
1.00 CEMEN PUMP SURFAC Mixed & pumped Tail slurry (G wI .2% D046, .3% 0065, & 1% S002)
@ 15.8 ppg - Dropped top plug wI 20 bbls water fl Dowell - Switch to rig
pumps & displace cement wI 228.4 bbls 9.6 ppg mud @ 7 B/M fl 420 to
790 psi - slowed pumps to 3112 B/M for last 18.4 bbls of displacment-
Bumped plug w/11 00 psi - CIP @ 0053 hrs. - Full circulation
throughout wI 130 bbls. 10.7 ppg cement reutrns to surface
Check floats, held. Test casing to 2500 psi for 30 minutes.
LD cement head - landing joint, elevators and long bails
ND flowline, riser and FMC speed head. Install FMC Unibody Wellhead
- test MIM seal to 1000 psi. NU BOPE, flow nipple and flowline.
Set test plug and test BOPE 250/5000 psi, Annular preventer 250/3500
psi.
AOGCC (John Crisp) waived witnessing tests. Pull test plug and install
wear bushing.
Install drilling bails and 4" elevators
Rigged up and picked up drillpipe from pipeshed and stood back in the
derrick.
Picked up BHA and tested Geo Span.
Installed guide wheels on top drive dolly.
Serviced rig.
RIH picking up DP to 2470'.
RIH -= PU 23 jts. of 4" drill pipe - wash down from 3067' - tagged
cement @ 3193'
Drill out cement, FC, FS and rathole to 3312' - 504 gpm 12250 psi I
50-80 rpm
Drill 20' of new hole to 3332' - ADT =0.15 hrs.
CBU - condition mud for FIT
RU and perform LOT, established LO @ 16.4 ppg EMW.
Drill 8 1/2" hole from 3332' to 4304' MD - 2865' TVD
Displaced to 9.6 ppg LSND mud while drilling ahead.
WOB 4/20 k RPM 120/150 GPM 650 @ 2450 psi
String wt. PU 148 SO 110 Rot. 1120
Torque on/off btm - 10,500 I 8,000 ft. Ibs.
ADT = 4.45 hrs ECD 10.6 ppg - 11.1 ppg
12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 4304' to 5832' MD - 3637' TVD
WOB 10/20 k RPM 150 GPM 650 @ 3150 psi
String wt. PU 160 SO 110 Rot. 130
Torque on/off btm - 10,000/8,500 ft. Ibs.
6/7/2004
15:30 - 21 :00
21 :00 - 22:30
22:30 - 00:00
6/8/2004
00:00 - 01 :00
01 :00 - 01 :45 0.75 CASE DEQT SURFAC
01 :45 - 02:45 1.00 CEMEN PULD SURFAC
02:45 - 05:30 2.75 WELCT NUND SURFAC
05:30 - 10:00 4.50 WELCT BOPE SURFAC
10:00 - 10:30 0.50 DRILL RIRD SURFAC
10:30 - 16:15 5.75 DRILL PULD SURFAC
16:15 - 21:00 4.75 DRILL PULD SURFAC
21 :00 - 21 :30 0.50 RIGMNT RGRP SURFAC
21 :30 - 22:00 0.50 RIGMNT RSRV SURFAC
22:00 - 00:00 2.00 DRILL TRIP SURFAC
6/9/2004 00:00 - 01 :30 1.50 DRILL TRIP SURFAC
01 :30 - 02:45 1.25 CEMEN DSHO SURFAC
02:45 - 03:00 0.25 DRILL DRLG SURFAC
03:00 - 03:30 0.50 DRILL CIRC SURFAC
03:30 - 04:00 0.50 DRILL LOT SURFAC
04:00 - 12:00 8.00 DRILL DRLG INTRM1
12:00 - 00:00
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/9/2004 12:00 - 00:00 12.00 DRILL DRLG INTRM1 ADT = 7.2 hrs ECD 10.6 ppg - 11.6 ppg
6/10/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 5832' to 7331' MD - 4369' TVD
WOB 10/30 k RPM 150 GPM 650 @ 2810 psi
String wt. PU 200 SO 120 Rot. 145
Torque on/off btm - 13,000/10,500 ft. Ibs.
ADT = 7.3 hrs ECD 10.6 ppg - 11.2 ppg
12:00 - 20:00 8.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 7331' to 8500' MD - 4979' TVD
WOB 15/30 k RPM 150 GPM 650 @ 3800 psi
String wt. PU 210 SO 120 Rot. 150
Torque on/off btm - 14,000/12,500 ft. Ibs.
ADT = 5.5 hrs ECD 10.6 ppg - 11.1 ppg
20:00 - 21 :00 1.00 DRILL SURV INTRM1 Had 12 Deg/100' Dog leg (20 Deg over 30') Azm turned from 266 to 277
while building 2 Deg. of angle. Surveyed 30 Ft. stations @ 8409',8442',
8462', and 8473'.
21 :00 - 00:00 3.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 8500' to 8696' MD - 5074' TVD Survey 30'
stations.
WOB 15/30 k RPM 150 GPM 650 @ 3800 psi
String wt. PU 215 SO 120 Rot. 153
Torque on/off btm - 14,000/13,000 ft. Ibs.
ADT= 1.5 hrs ECD 10.6 ppg
6/11/2004 00:00 - 14:00 14.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 8696' to 10511' MD - 6005' TVD
WOB 15/25 k RPM 150 GPM 630 @ 3600 psi
String wt. PU 250 SO 125 Rot. 165
Torque on/off btm - 16,000/14,000 ft. Ibs.
ADT = 9.2 hrs ECD 10.7 ppg - 10.9 ppg
14:00 - 14:45 0.75 DRILL SURV INTRM1 8 Deg/100' Right turn. Surveyed @ 10382',10350', and 10319' (Bit
depths.).
14:45 - 16:45 2.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 10511' to 10797' MD - 6160' TVD
WOB 15/25 k RPM 150 GPM 630 @ 3620 psi
String wt. PU 250 SO 125 Rot. 165
Torque on/off btm - 16,000/14,000 ft. Ibs.
ADT= 1.4 hrs ECD 10.7 ppg - 10.9 ppg
16:45 - 17:30 0.75 DRILL SURV INTRM1 11 Deg/100' Left turn. Surveyed @ 10637', 10669', and 10700' (Bit
depths.).
17:30 - 00:00 6.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 10797' to 11551' MD - 6547' TVD
WOB 20/25 k RPM 150 GPM 630 @ 3650 psi
String wt. PU 250 SO 135 Rot. 170
Torque on/off btm - 18,000/16,500 ft. Ibs.
ADT = 4 hrs ECD 10.7 ppg -11 ppg
6/12/2004 00:00 - 17:30 17.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 11551' to 13245' MD - 7428' TVD
WOB 20/25 k RPM 150 GPM 600 @ 3980 psi
String wt. PU 260 SO 145 Rot. 180
Torque on/off btm - 18,000/15,000 ft. Ibs.
ADT = 11.7 hrs ECD 10.8 ppg - 11 ppg
17:30 - 19:45 2.25 DRILL CIRC INTRM1 Pumped pill and circulated hole clean.
19:45 - 21 :00 1.25 DRILL TRIP INTRM1 POOH with pump to 12200'. Pumping 5 BPM.
21 :00 - 23:00 2.00 DRILL TRIP INTRM1 POOH on trip tank to 8500'.
23:00 - 23:30 0.50 DRILL SURV INTRM1 Re surveyed dog leg @ 8504',8473', and 8442'. Max DLS 16.47
Deg/30' .
23:30 - 00:00 0.50 DRILL CIRC INTRM1 Pumped dry job and blew down top drive.
6/13/2004 00:00 - 04:15 4.25 DRILL TRIP INTRM1 POOH from 8510' to 3258', wiped tight spots @ 7444', 6876' and 5202'
25-40 k over.
Monitor well @ shoe, static. POOH to 673', lay down ghost reamer and
Printed: 7/2912004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
xo, change running tools to 5" and stand back hwdp & jars.
UD stab, stand back dc's, remove source and download LWD. Lat
down LWD tools, service and lay down Geopilot and bit. Clear tools
from floor.
RU and pick up 30 joints of 3 1/2" tubing - rig down power tongs -
change elevators to 4".
RIH with tubing tail below 4" drill pipe, tag bottom @ 13,245'.
Space out and RU circulating hose.
Stage pumps up to 10 bpm 12250 psi, reciprocate pipe 255K up I 140k
dn - circ and condition mud for cementing. PJSM. Flow check well,
static.
With tubing tail @ 13243', plugged back 81/2" open hole with 40 bbls
of class G cement displaced to equalization - ETOC 12745' with 15%
excess.
POOH 10 stands to 12226'.
Rigged up and Circulated 50 Sbls mud.
POOH to 8831'.
Spotted 38 Sbls Hi vis mud and displaced with 89 Sbls. mud.
POOH to 8480'.
Circulated and conditioned mud. PJSM.
With tubing tail @ 8480', plugged back 81/2" open hole with 46 bbls of
class G cement mixed at 17 PPG. displaced to equalization - ETOC
7970' with 15% excess. CIP @ 2337 Hrs. 6/13/04.
POOH to 7970'.
Circulated hole clean.
POOH to 6212'.
DP overpulled 50 to 60 K from 6212' to 5409' and had to be pulled
through tight spots with pump @ 10 -12 SPM.
POOH on trip tank to 940'. Tight spot @ 5055' 25 K.
Rigged up and POOH laying down 3.5" tubing tail.
Pulled wear bushing and ran test plug.
Tested SOPE 250/5000 psi, Annular preventer 250/3500 psi. Tested
Closing unit and floor valves 250/5000.
AOGCC (John Crisp) waived witnessing tests. Pull test plug and install
wear bushing.
Made up SHA #3 and RIH to 1800'. Shollow tested MWD.
RIH to 3000'.
Slipped and cut Drilling line.
RIH to 7812' filling pipe every 2000'.
Washed and reamed to 8000' took check shots to tie in surveys.
Dressed plug to 8020'
Drill and side track 8 1/2" hole from 8020' to 8080' MD - 4756' TVD
WOS 10/25 k RPM 100 GPM 504 @ 2400 psi
String wt. PU 155 SO 120 Rot. 130
Torque on/off btm - 12,000/10,500 ft. Ibs.
ADT = .5 hrs ECD 10.4 ppg - 10.6 ppg
12.00 DRILL DRLG INTRM1 Drill and side track 81/2" hole from 8080' to 9488' MD - 5487' TVD
WOB 10/25 k RPM 100 GPM 650 @ 3320 psi
String wt. PU 230 SO 125 Rot. 163
Torque on/off btm - 15,500/14,500 ft. Ibs.
ADT= 7.8 hrs ECD 10.4 ppg - 10.8 ppg
12.00 DRILL DRLG INTRM1 Drill 81/2" hole from 9488' to 11020' MD - 6266' TVD
WOB 10/25 k RPM 100 GPM 650 @ 3650 psi
07:45 - 09:10 ASANDN
09:10 - 15:00 ASANDN
15:00 - 15:30 ASANDN
15:30 - 17:30 ASANDN
17:30 - 18:15 0.75 CEMEN PLUG ABANDN
18:15-18:45 0.50 CEMEN TRIP ASANDN
18:45 - 19:15 0.50 CEMEN CIRC ASANDN
19:15 - 21:30 2.25 CEMEN TRIP ASANDN
21 :30 - 21 :45 0.25 CEMEN CIRC ASANDN
21 :45 - 22:00 0.25 CEMEN TRIP ASANDN
22:00 - 23:00 1.00 CEMEN CIRC ASANDN
23:00 - 00:00 1.00 CEMEN PUMP ASANDN
6/14/2004 00:00 - 00:15 0.25 CEMEN TRIP ASANDN
00:15 - 01 :30 1.25 CEMEN CIRC ABANDN
01 :30 - 02:00 0.50 CEMEN TRIP ABANDN
02:00 - 04:30 2.50 CEMEN TRIP ASANDN
04:30 - 07:15 2.75 CEMEN TRIP ASANDN
07:15 - 09:00 1.75 CEMEN PULD ASANDN
09:00 - 09:30 0.50 WELCT BOPE ASANDN
09:30 - 13:30 4.00 WELCT SOPE ASANDN
13:30 - 16:45 3.25 DRILL PULD ASANDN
16:45 - 17:45 1.00 DRILL TRIP ASANDN
17:45 - 18:45 1.00 RIGMNT RSRV ASANDN
18:45 - 21:45 3.00 DRILL TRIP ASANDN
21:45 - 23:15 1.50 DRILL REAM ABANDN
23:15 - 00:00 0.75 DRILL DRLG INTRM1
6/15/2004
00:00 - 12:00
12:00 - 00:00
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/15/2004 12:00 - 00:00 12.00 DRILL DRLG INTRM1 String wt. PU 265 SO 125 Rot. 168
Torque on/off btm - 16,500/15,000 ft. Ibs.
ADT = 7.6 hrs ECD 10.6 ppg - 11 ppg
6/16/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 81/2" hole from 11020' to 12582' MD -7047' TVD
WOB 20/25 k RPM 170 GPM 600 @ 3930 psi
String wt. PU 245 SO 145 Rot. 185
Torque on/off btm - 17,000/16,000 ft. Ibs.
ADT = 7.7 hrs ECD 10.6 ppg - 11 ppg
12:00 - 22:15 10.25 DRILL DRLG INTRM1 Drill 81/2" hole from 12582' to 13608' MD -7342' TVD
WOB 20/30 k RPM 170 GPM 600 @ 4050 psi
String wt. PU 270 SO 135 Rot. 185
Torque on/off btm - 19,000/18,000 ft. Ibs.
ADT = 7.2 hrs ECD 10.6 ppg - 11 ppg
22:15 - 00:00 1.75 DRILL CIRC INTRM1 Pumped sweep and circulated hole clean.
6/17/2004 00:00 - 02:15 2.25 DRILL WIPR INTRM1 POOH with pump @ 4 BPM to 11,965'. Had overpull to 35 K in HRZ
with minor packing off.
02:15 - 03:15 1.00 DRILL WIPR INTRM1 RIH and washed down last stand (precaution).
03:15 - 05:30 2.25 DRILL CIRC INTRM1 Pumped sweep and circulated hole clean.
05:30 - 07:30 2.00 DRILL TRIP INTRM1 POOH to 12,158' spotting pill on bottom.
07:30 - 15:45 8.25 DRILL TRIP INTRM1 POOH to 1,146' max overpull 60 K @ 11890'.
15:45 - 19:30 3.75 DRILL PULD INTRM1 POOH and laid down BHA.
19:30 - 21 :00 1.50 DRILL OTHR INTRM1 Pulled wear bushing and flushed stack. Ran Thin ring and test plug.
21 :00 - 22:00 1.00 WELCT BOPE INTRM1 Changed rams to 7" and tested rams.
22:00 - 23:00 1.00 CASE RURD INTRM1 Rigged up to run casing.
23:00 - 00:00 1.00 CASE RUNC INTRM1 PJSM and ran 6 Jts. of 7" 26# L-80 BTCM casing.
6/18/2004 00:00 - 02:15 2.25 CASE RUNC INTRM1 Rih wI 7" csg from 250' to 3261'.
02:15 - 02:45 0.50 CASE CIRC INTRM1 Circ 1 csg volume at 5 bpm at 310 psi.
02:45 - 03:30 0.75 CASE OTHR INTRM1 Change out Franks fill up tool. Cup was leaking.
03:30 - 07:45 4.25 CASE RUNC INTRM1 RIH wI 7" csg from 3261' to 7590'.
07:45 - 08:45 1.00 CASE CIRC INTRM1 Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. Dn wt - 120k.
08:45 - 13:00 4.25 CASE RUNC INTRM1 RI H wI 7" csg from 7590' to 11 ,816'.
13:00 - 15:00 2.00 CASE CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. On wt - 145
k.
15:00 - 00:00 9.00 CASE RUNC INTRM1 RIH w/7" csg from 11816' to 12,750'. From 12750' to 13515' casing
was tight 460 K up and All of weight down to make a few feet at a time.
Attempts to circulate tried to pack off.
6/19/2004 00:00 - 00:30 0.50 CASE RUNC INTRM1 Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger
and landed casing @ 13598'.
00:30 - 01 :00 0.50 CASE RURD INTRM1 Rigged down fill up tool and made up cement head and lines.
01:00-03:15 2.25 CEMEN CIRC INTRM1 Broke circulation with 1 BPM and worked up in stages to 7 BPM as
pressure and flow stabilized. Final circulating pressure 1000 PSI @ 7
BPM with full returns. Attempted to work pipe pulled up to 475 K. Pipe
stuck. Seweight back on hanger. PJSM for cement job.
03:15 - 05:15 2.00 CEMEN PUMP INTRM1 Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100,
50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement.
Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls
9.8 mud. Bumped plug with 1400 PSI. Check floats OK. CIP @
0505Hrs. 6/19/04.
05:15 - 06:00 0.75 CASE MIT INTRM1 Rigged up and tested casing 3500 PSI for 30 miniutes.
06:00 - 06:45 0.75 CASE RURD INTRM1 Rigged down cement and casing tools.
06:45 - 07:45 1.00 CASE DEQT INTRM1 Laid down landing joint. Installed and tested packoff.
07:45 - 08:45 1.00 WELCT EQRP INTRM1 Changed out rams from 7" to VBR.
08:45 - 13:00 4.25 WELCT BOPE INTRM1 Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
lines, kill lines, choke and kill valves and floor valves to 250/5000 PSI.
Tested IBOP to 250/5000 PSI. State inspecter. AOGCC (Chuck
Scheve) waived witnessing tests. Pull test plug and install wear
bushing.
13:00 - 13:30 0.50 DRILL RIRD INTRM1 Picked up bales and elevators.
13:30 - 17:30 4.00 DRILL PULD INTRM1 Made up BHA and RIH. Shallow tested MWD.
17:30 - 20:30 3.00 DRILL PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at
4000'.
20:30 - 00:00 3.50 DRILL TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'.
6/20/2004 00:00 - 00:30 0.50 DRILL TRIP INTRM1 RIH to 13,358'.
00:30 - 01 :30 1.00 RIGMNT RSRV INTRM1 Slipped and cut drilling line.
01 :30 - 04:30 3.00 CEMEN DSHO INTRM1 Drilled out shoe track and cleaned out rat hole to 13,608'.
04:30 - 05:00 0.50 DRILL DRLG INTRM1 Drill 61/8" hole from 13608' to 13628' MD - 7342' TVD
WOB 6/10 k TO RPM 50 GPM 200 @ 1530 psi
String wt. PU 240 SO 130 Rot. 175
Torque on/off btm - 19,000/18,000 ft. Ibs.
ADT = .3 hrs ECD 10. ppg - 11 ppg
05:00 - 06:15 1.25 CEMEN CIRC INTRM1 Circulated and conditioned mud for FIT.
06:15 - 07:00 0.75 CEMEN FIT INTRM1 FITto 12.5 PPG EMW.
07:00 - 07:15 0.25 DRILL SFTY PROD PJSM for mud change out.
07:15 - 09:15 2.00 DRILL CIRC PROD Changed out mud system displaced 9.8 PPG LSND with 8.5 PPG
MOBM.
09:15 - 12:00 2.75 DRILL DRLH PROD Drill 61/8" hole from 13628' to 13700' MD -7348' TVD
WOB 6/10 k TO RPM 50 GPM 200 @ 1530 psi
String wt. PU 240 SO 130 Rot. 175
Torque on/off btm - 19,000/18,000 ft. Ibs.
ADT = 1.4 hrs AST 1.2 ART .2 ECD 10. ppg - 11 ppg
12:00 - 00:00 12.00 DRILL DRLH PROD Drill 61/8" hole from 13700' to 14312' MD - 7334' TVD
WOB 6/10 k TO RPM 50 GPM 220 @ 2750 psi
String wt. PU 265 SO 120 Rot. 175
Torque on/off btm - 17,000/17,000 ft. Ibs.
ADT = 8.8 hrs AST 4.5 ART 4.3 ECD 9.6. ppg - 10.2 ppg
6/21/2004 00:00 - 04:30 4.50 DRILL DRLH PROD Drill 61/8" hole from 14312' to 14598' MD -7330' TVD
WOB 6/10 k TO RPM 90 GPM 220 @ 2800 psi
String wt. PU 265 SO 120 Rot. 175
Torque on/off btm - 17,000/17,000 ft. Ibs.
ADT = 4.0 hrs AST .5 ART 3.5 ECD 9.6. ppg - 10.2 ppg /
04:30 - 05:15 0.75 DRILL CIRC PROD Circulate while raising MW to 8.7 PPG to counter Connection gas.
05:15 - 05:45 0.50 DRILL DRLH PROD Drill 61/8" hole from 14598' to 14618' MD - 7330' TVD
WOB 6/10 k TO RPM 90 GPM 220 @ 2750 psi
String wt. PU 265 SO 120 Rot. 175
Torque on/off btm - 16,000/16,000 ft. Ibs.
ADT = .5 hrs AST 0 ART .5 ECD 9.6. ppg - 10.2 ppg
05:45 - 06:15 0.50 DRILL CIRC PROD Attempted to slide. Circulate and spotted nut plug pill.
06:15 - 07:30 1.25 DRILL DRLH PROD Drill 6 1/8" hole from 14618' to 14694' MD - 7332' TVD
WOB 6/10 k TD RPM 90 GPM 220 @ 2750 psi
String wt. PU 265 SO 120 Rot. 175
Torque on/off btm - 17,000/17,000 ft. Ibs.
ADT = .75 hrs AST 0 ART .75 ECD 9.6. ppg - 10.2 ppg
07:30 - 08:45 1.25 DRILL CIRC PROD Checked well slight flow. Circulated and raised MW to 8.8 PPG. j
08:45 - 12:00 3.25 DRILL DRLH PROD Drill 61/8" hole from 14694' to 14885' MD - 7337' TVD
WOB 6/10 k TO RPM 90 GPM 220 @ 2950 psi
String wt. PU 270 SO 125 Rot. 177
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/21/2004
08:45 - 12:00
3.25 DRILL DRLH PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
6/22/2004
00:00 - 12:00
12.00 DRILL DRLG PROD
12:00 - 19:30
7.50 DRILL DRLH PROD
19:30 - 20:30 1.00 DRILL OTHR PROD
20:30 - 22:30 2.00 DRILL CIRC PROD
22:30 - 00:00 1.50 DRILL DRLH PROD
6/23/2004
00:00 - 12:00
12.00 DRILL DRLG PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
6/24/2004
00:00 - 08:30
8.50 DRILL DRLG PROD
08:30 - 11 :00
11 :00 - 18:30
2.50 DRILL CIRC PROD
7.50 DRILL WIPR PROD
Torque on/off btm - 16,000/16,000 ft. Ibs.
ADT = 1.45 hrs AST .15 ART 1.3 ECD 9.6. ppg - 10.2 ppg
Drill 61/8" hole from 14885' to 15480' MD -7317' TVD
WOB 6/10 k TO RPM 90 GPM 220 @ 3160 psi
String wt. PU 265 SO 120 Rot. 175
Torque on/off btm - 16,500/16,000 ft. Ibs.
ADT = 8.3 hrs AST 2.06 ART 6.24 ECD 9.6. ppg - 10.2 ppg
Drill 6 1/8" horizontal section f/ 15,480' to 16,126' MD 7311' TVD
WOB 5/12 k RPM 100 GPM 220 @ 3100 psi
String wt. PU 265 SO 120 Rot 174
Torque on/off btm - 17,500/17,000 ftllbs
Total ADT 8.50 hrs = ART - 7.03 hrs AST - 1.47 hrs
Drill 6 1/8" horizontal section f/16, 126' to 16,508' MD 7306' TVD
WOB 9/11 k RPM 90 GPM 220 @ 3200 psi
Stringwt. PU210 SO 115 Rot 174
Torque on/off btm - 17000/17000 ft,/Ibs
ADT - 5.27 hrs. = ART - 4.14 hrs. AST - 1.13 hrs.
. Note - MWD failed @ kelly down
Trouble shoot MWD - Pumped 5 bbls minerial oil sweep - Unable to get
MWD to respond
Circulate & weight up to 9.0 ppg for trip out - MWD tool began working
again - Make connection & check out tool - tool responding
Drill 6 1/8" hole f/16,508' to 16,554' MD 7307' TVD
WOB 7/9 k RPM 90 GPM 220 @ 3100 psi
String wt. pu 270 SO 115 Rot 174
Torque on/off btm. - 17,000/17,000 ftllbs.
ADT -.63 hrs. = ART - .25 hrs. AST - .38 hrs.
Bringing mud wt. back to 8.9 ppg
Drill 6 1/8" horizontal section f/16,554' to 17,093' MD 7309' TVD
WOB 7/11 k RPM 100 GPM 220 @ 3260 psi
String wt. PU 275 SO 115 Rot 170
Torque on/off btm - 17,500/17,500 ftllbs
Total ADT 8.20 hrs = ART - 6.69 hrs AST - 1.51 hrs
Drill 6 1/8" horizontal section f/17,093' to 17,665' MD 7311' TVD
WOB 7/10 k RPM 100 GPM 220 @ 3260 psi
String wt. PU 275 SO 110 Rot 170
Torque on/off btm - 17,000/17,000 ftllbs.
Total ADT -8.32 hrs. = ART - 7.2 hrs AST - 1.12 hrs.
Average ECD past 24 hrs. - 10.8 to 11.3
Drill 6 118" horizontal section f/17,665' to 18,131' MD 7311' TVD
WOB 7/10 k RPM 100 GPM 220 @ 3440 psi
String wt. PU 275 SO 105 Rot 170
Torque on/off btm - 18,000/18,000 ftllbs
Total ADT- 6.98 hrs = ART - 6.24 hrs AST - .74 hrs
ECD at TO - 11.5 - 11.6
Circ and condition mud. Increase mud wt to 9.0 ppg for trip margin.
Monitor well. (Static) POH wI pump from 18,131' to 13,544' 207 gpm
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/24/2004 11 :00 - 18:30 7.50 DRILL WIPR PROD with 90 rpms.
18:30 - 19:00 0.50 DRILL OBSV PROD Monitor well -(static) - Clean up rig floor of OBM for TIH
19:00 - 21 :30 2.50 DRILL TRIP PROD RIH f/13,544' to 18,035'
21 :30 - 00:00 2.50 DRILL CIRC PROD Wash & ream f/18,035' to 18,131' - Circulate hole clean for trip out
207 gpm @ 2800 psi 90 rpm
6/25/2004 00:00 - 00:30 0.50 DRILL CIRC PROD Finish circ 2X bottoms up to clean hole. 207 gpm - 2790 psi - 90 rpm's
00:30 - 08:30 8.00 DRILL TRIP PROD Check flow. Static. POH wI pump and rotary from 18,131' to 13,548'.
207 gpm - 2720 psi - 90 rpm's.
08:30 - 10:00 1.50 DRILL CIRC PROD Check flow. Static. CBU. 210 gpm - 2580 psi -70 rpm's. Check flow.
Static. Drop 2.25" rabbit w/11 0' tail.
10:00 - 14:30 4.50 DRILL TRIP PROD POH wI pump from 13,548' to 10,206. Hole taking proper fill.
14:30 - 15:30 1.00 DRILL OBSV PROD Attempt to POH without pump. Well is static with no pipe movement.
Moving pipe up or down or pipe rotation will cause well to flow.
15:30 - 17:00 1.50 DRILL TRIP PROD RIH f/10,206' to 13,550'
17:00 - 19:00 2.00 DRILL CIRC PROD Circulate bottoms - 5 BPM wI 20 RPM - ICP 2560 FCP 2450 - monitor
well - still slight flow - Continue to circulate for surface to surface .;
strokes - monitor well - still slight flow
19:00 - 20:00 1.00 WELCT OBSV PROD Shut in well & monitor pressures for 20 mins. ISIDDP 10 psi ISICPO
FSIDDP - 10 psi FSICP - 0
Open well obsevered slight flow
Notified Weekend duty Supervisor - discussed options
20:00 - 21 :30 1.50 RIGMNT RSRV PROD Change out saver sub in top drive - monitored well on trip tank - no gain
- pulled slips & observed slight flow
21 :30 - 00:00 2.50 DRILL TRIP PROD RIH f/13,550' to 17,750'
6/26/2004 00:00 - 00:30 0.50 DRILL TRIP PROD Finish RIH from 17,750' to 18,131'. No hole problems.
00:30 - 02:30 2.00 DRILL CIRC PROD Circ 2X bottoms up at 200 gpm - 2600 psi - 90 rpms. No gas, crude or
gas cut mud in returns.
02:30 - 10:30 8.00 DRILL TRIP PROD Monitor well. (static). POH wI pump and rotary from 18,131' to 13,596'.
200 gpm - 2300 psi - 90 rpms.
10:30 - 11 :00 0.50 DRILL OBSV PROD Monitor well at shoe. (static). Rotate pipe at 20 rpms. Well is staic.
11 :00 - 15:45 4.75 DRILL TRIP PROD POH wI pump and rotary from 13,596' to 10,206'. 200 gpm - 2000 psi -
30 rpms
15:45 - 21 :00 5.25 DRILL TRIP PROD Continue to POH wI pump f/1 0,206' to 6575' - 202 gpm @ 1600 psi wI
30 rpm
Hole taking proper fill v'
21 :00 - 21 :30 0.50 DRILL OBSV PROD Monitor well - observed slight flow ( same as before)
21 :30 - 22:00 0.50 DRILL TRIP PROD Continue POH wI pump f/6575' to 6100' - as parameters as before
22:00 - 23:30 1.50 DRILL CIRC PROD Monitor well - observed slight flow - circulate 2 x btms up - Go gas -
mud wt. 9.1 ppg
Notified weekend supervisor & discussed options
23:30 - 00:00 0.50 DRILL OBSV PROD Monitor well for flow - slight flow
6/27/2004 00:00 - 01 :30 1.50 DRILL OBSV PROD Cont' to observe well. Small flow. < 2 bbls in two hours into trip tank
01 :30 - 07:00 5.50 DRILL TRIP PROD POH wI pump f/6035' to 3044' - 202 gpm @ 1400 psi wI 30 rpm. Last 5
stds had 0 hole fill.
07:00 - 08:30 1.50 DRILL OBSV PROD Observe well. Had small flow. Close annular. Circ well to fill choke lines
and gas buster. Shut well in. Monitor pressures. Initial - DP - 20 psi
Annulus - 0 psi. I hr SIP - DP - 20 psi Annulus - 15 psi.
08:30 - 10:00 1.50 DRILL CIRC PROD Circ and increase mud wt to 10.0 ppg.
10:00 - 10:30 0.50 DRILL OBSV PROD Observe well (static). POH w/1 std DP. Fluid level dropped in bell
nipple.
10:30 - 17:30 7.00 DRILL TRIP PROD RIH wI 4" DP from 3044' to 13,550'. Fill pipe every 20 stds wI 9.5 ppg
mud.
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
6/27/2004 17:30 - 19:00 1.50 DRILL CIRC PROD Circulate to 9.4+ ppg - 4 BPM @ 1820 pis wI 30 rpm - flow check - well
static
19:00 - 20:30 1.50 RIGMNT RSRV PROD Cut & slip 60' drilling line - (monitor well - fluid level 6" below flow line
after 1.5 hrs.)
20:30 - 21 :00 0.50 DRILL CIRC PROD Began to circulate to POOH - Observed gas breaking out of mud @
possium belly - mud wt. 9.4+ ppg - checked mud wI hand held gas
monitor - showed 24 ppm C02-
Circulate out - flow check (static)
21 :00 - 00:00 3.00 DRILL TRIP PROD POOH wI pump f/13,550' to 12,115' - 4 BPM @ 1600 pis psi wI 30 rpm
- hole taking proper fill
6/28/2004 00:00 - 03:30 3.50 DRILL TRIP PROD POOH wI pump f/12, 115' to 9733' - 4 BPM @ 1300 psi wI 30 rpm -
hole taking proper fill
03:30 - 04:00 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking
fluid.
04:00 - 05:30 1.50 DRILL TRIP PROD POOH wI pump f/9733' to 8788' - 4 BPM @ 1200 psi wI 30 rpm - hole
taking proper fill
05:30 - 06:00 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking
proper fill.
06:00 - 08:00 2.00 DRILL TRIP PROD POOH wI pump f/8788' to 6700' - 4 BPM @ 1100 psi wI 30 rpm - hole
taking proper fill
08:00 - 08:30 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking
proper fill.
08:30 - 12:00 3.50 DRILL TRIP PROD POOH wI pump fl 6700' to 4950' - 4 BPM @ 1000 psi wI 30 rpm - hole
taking proper fill
12:00 - 13:30 1.50 DRILL TRIP PROD Observe well. (static). POH on trip tank from 4950' to 3044'.
13:30 - 15:30 2.00 DRILL TRIP PROD POH on TT fl 3044' to 376' - hole took proper fill
15:30 - 17:00 1.50 DRILL TRIP PROD Handle BHA - stand back HWDP & jars, NM flex DC's, MWD & motor -
break off bit
17:00 - 17:30 0.50 CMPL TN OTHR CMPL TN Clean up rig floor fl OBM for liner run
17:30 - 18:00 0.50 CMPL TN RURD CMPL TN RU to run 4 1/2" liner
18:00 - 00:00 6.00 CMPL T RUNT CMPL TN PJSM - Run 41/2" 12.6# L-80 IBTM liner w/4 1/2" tbg pup jts wI (8)
1/2" holes as follows: Baker Float shoe - 1 jt tbg - pup - 4 jts tbg - pup -
4 jts tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts.
tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg -
pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup -
4 jts. tbg - pup - 3 jts. tbg - pup - 9 jts tbg - pup - 4 jts. tbg - pup - 4 jts.
tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 3 jts. tbg -
pup - 26 jts tbg.
Ran 122 jts. total wI 24 total pup jts. w/8 - 1/2" holes
6/29/2004 00:00 - 02:00 2.00 CMPL TN RUNT CMPL TN PU & MU Baker Seal bore extension, Baker Flex Loc liner hanger,
Baker ZXP liner top packer
02:00 - 13:30 11.50 CMPL TN RUNT CMPL TN RIH w/41/2" liner assembly on 4" DP f/5430' to 13511'.
13:30 - 13:45 0.25 CMPL TN CIRC CMPL TN Establish circulating rates I pressures - 2 bpm @ 800 psi, 3 bpm @
1000 psi and 4 bpm @ 1250 psi.
13:45 - 20:00 6.25 CMPL TN RUNT CMPL TN Continue running 4 1/2" liner assembly 0 4" DP from 13511' to 18,121'
20:00 - 21 :30 1.50 CMPL TN PCKR CMPL TN PJSM - Drop hanger setting ball & pump down @ 3 BPM @ 1300 psi -
Pressure up to 2700 psi to set liner hanger - slacked off wI 50 k to verify
hanger set - Pressure up to 4000 psi to relaese running tools - rotate &
set down to set ZXP liner top packer - Test annulus to 1000 psi
Top of liner - 12,628' Tail @ 18,119'
21 :30 - 22:00 0.50 CMPL TN PCKR CMPL TN Attempt to shear ball seat - pressure up DP to 5000 psi wI Dowell ( ball
shear pinned for 4800 psi) made 5 attempts to shear out - unsuccessful
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
Pull up to clear running tools f/liner top - LD top single - Monitor well
(static) - Blow down Dowell lines & kill line - Circulate bottoms up @ 4
BPM ICP 1500 - FCP 1250 psi
Monitor well, static. Pump out of hole from 12603' to 5347' @ 4 bpm I
1150 - 460 psi. Attempted to pull with out pumps @ 9643',7300',5347',
swabbing hole.
Pump out from 5347' to 3436' @ 4 bpm 1460 psi.
Monitor well, static. POOH on trip tank from 3436' to 1520' - Flow check
-static - POOH on TT f/ 1520' to 40'
Change out elevatores & LD Baker liner running tool - Flow check -
static
Pull wear bushing - clean up rig floor - Blow down TO
RU to run 3 1/2" tbg - PJSM
Run 3 1/2" 9.3# L-80 EUE Mod tbg as follows: Baker 80/40 Seal
Assembly -locator sub w/3 1/2" pup jt. - 1 jt. tbg - XN nipple wI RHC
plug installed - 2 jts. tbg - Baker CMPA sliding sleeve - 2 jts tbg -
Cameo KBUG GLM wI dummy - 68 jts tbg to 2350'
Run 3 1/2" 9.3# L-80 EUE Mod tbg from 2350' to 10324' (total of 331
jts).
MU TRM4E SSSV - RU control line spooler - attach and test single
control line to 5000 psi 110 min.
Continue to run tubing - installing one band per joint - RU pump down
hose on jnt. # 406 - establish circ with 1.5 bpm 1740 psi - located top of
PBR, shut down and bleed off pump. Slack off and tag down with
locator sub.
2.00 CMPL TN OTHR CMPL TN lay down 3 joints of 31/2" tubing - change running tools to 4 1/2" - MU
XO sub - (1) 41/2" pup joint - 1 joint of 4 1/2", 12.6#, L-80, IBTM tbg
and FMC tubing hanger. Attach Control line to hanger and test
connection to 5000 psi. MU landing joint A and land hanger in wellhead
with tail @ 12678' (locator sub 4' above no go).
RILDS - LD LJa - install TWC - MU LJb and test hanger seals to 5000
psi. LD LJb.
RU & flush BOP stack - kill & choke lines - gas buster - blow down TO
ND flow line - bell nipple - turn buckles - ND & set back BOP stack -
Change saver sub in TD
NU tree - test seals to 5000 psi - RU FMC lubicator - Test tree &
lubicator to 5000 psi -Pull TWC - RU Doyon lubicator & drop rod & ball -
6/29/2004 22:00 - 00:00 2.00 CMPL TN CIRC CMPL TN
6/30/2004 00:00 - 11 :30 11.50 CMPL TN TRI P CMPL TN
11 :30 - 14:00 2.50 CMPL TN TRI P CMPL TN
14:00 - 18:30 4.50 CMPL TN TRI P CMPL TN
18:30 - 19:00 0.50 CMPL TN PULD CMPL TN
19:00 - 20:00 1.00 CMPL TN OTHR CMPL TN
20:00 - 20:30 0.50 CMPL TN RURD CMPL TN
20:30 - 00:00 3.50 CMPL TN RUNT CMPL TN
7/1/2004 00:00 - 07:30 7.50 CMPL TN RUNT CMPL TN
07:30 - 08:30 1.00 CMPL TN RUNT CMPL TN
08:30 - 13:30 5.00 CMPL TN RUNT CMPL TN
13:30 - 15:30
15:30 - 16:30 1.00 CMPL TN SEaT CMPL TN
16:30 - 18:00 1.50 CMPL TN OTHR CMPL TN
18:00 - 19:30 1.50 CMPL TN NUND CMPL TN
19:30 - 22:00 2.50 CMPL TN SEaT CMPL TN
22:00 - 00:00 2.00 CMPL TN OTHR CMPL TN
7/2/2004 00:00 - 01 :00 1.00 CMPL TN DEaT CMPL TN
01 :00 - 02:00 1.00 CMPL TN RURD CMPL TN
02:00 - 03:00 1.00 CMPL TN OTHR CMPL TN
03:00 - 04:00 1.00 CMPL TN OTHR CMPL TN
04:00 - 05:30 1.50 CMPL TN OTHR CMPL TN
05:30 - 06:30 1.00 RIGMNT RGRP CMPL TN
06:30 - 15:30 9.00 CMPL TN OTHR CMPL TN
15:30 - 17:30 2.00 CMPL TN OTHR CMPL TN
RU hard line to tree - PJSM - Test lines to 4000 psi - Test tbg to 3500
psi for 30 mins.-
Bleed tbg to 2500 psi & pressure up on to annulus to 3500 psi
Pressure test Annulus to 3500 psi for 30 min - bled off annulus and
tubing.
Made four attempts with 3500 psi on annulus to shift sliding open,
unable (S/S pinned for 2800 psi).
Flush and vac out circ lines and manifold, RD same.
RU and test FMC lubricator - install BPV - RD lubricator and secure
wellhead.
Lay down BHA #4 from derrick.
Lay down excess 4" drill pipe from Derrick for rig move.
Drawworks electric brake tripped off - Troubleshoot Baylor Brake.
Continue to lay down 4" drill pipe from derrick - Total of 354 joints.
Remove excess equipment from rig floor - clean drill pipe and rig floor
Printed: 7/29/2004 11 :08:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD2-31
CD2-31
ROT - DRILLING
doyon1 @ppco.com
Doyon 19
Start: 6/5/2004
Rig Release: 7/2/2004
Rig Number:
Spud Date: 6/5/2004
End: 7/2/2004
Group:
71212004
15:30 - 17:30
2.00 CMPL TN OTHR CMPL TN drip pans of MOBM residue
Released Rig @ 1800 hrs. - Move to C02-53
Printed: 7/29/2004 11 :08:38 AM
.
.
16-Jul-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-31
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
7,956.83' MD
8,021.41' MD
18,131.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
'U oJiJ
I
DateJ ~ j JÎ~ v1- Signed
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
EÀ()'\J~'~-~"~'~
.
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-31
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
Survey Report
14 July, 2004
.
Your Ref: API 501032049300
Surface Coordinates: 5974482.74 N, 371713.04 E (70020'18.6650" N, 151002'27.5128" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Survey Ref: svy406
Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid)
Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True)
Kelly Bushing Elevation: 52.84ft above Mean Sea Level
Kelly Bushing Elevation: 52.84ft above Project V Reference
Kelly Bushing Elevation: 52. 84ft above Structure
sper"r"y-suil!
DFU........ING seRVices
A Halliburton Company
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31
Your Ref: API 501032049300
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7956.83 57.230 261.820 4636.72 4689.56 134.88 S 5911.10 W 5974449.01 N 365800.49 E 5509.61 Tie On Point
8021.41 56.780 262.640 4671 .89 4724.73 142.21 S 5964.77 W 5974442.60 N 365746.71 E 1.273 5557.55 Window Point
8069.56 56.200 264.800 4698.47 4751.31 146.60 S 6004.67 W 5974438.89 N 365706.74 E 3.929 5593.55
8118.37 55.970 265.570 4725.71 4778.55 150.00 S 6045.03 W 5974436.18 N 365666.32 E 1.391 5630.33
8213.55 55.730 265.230 4779.14 4831.98 156.32 S 6123.55 W 5974431.21 N 365587.71 E 0.389 5701.96 .
8309.15 56.260 267.590 4832.61 4885.45 161.27 S 6202.64 W 5974427.61 N 365508.55 E 2.120 5774.60
8404.48 57.380 270.200 4884.78 4937.62 162.80 S 6282.40 W 5974427.45 N 365428.78 E 2.575 5849.04
8499.78 58.690 269.770 4935.24 4988.08 162.82 S 6363.24 W 5974428.81 N 365347.94 E 1 .427 5925.02
8595.16 61.170 269.620 4983.02 5035.86 163.26 S 6445.78 W 5974429.78 N 365265.41 E 2.604 6002.44
8690.48 61.860 268.410 5028.48 5081.32 164.71 S 6529.54 W 5974429.77 N 365181.63 E 1.330 6080.68
8786.82 60.890 266.940 5074.64 5127.48 168.13 S 6614.04 W 5974427.79 N 365097.10 E 1.676 6158.92
8881.55 59.110 266.240 5122.00 5174.84 173.01 S 6695.92 W 5974424.32 N 365015.14 E 1.985 6234.22
8977.23 58.900 265.100 5171.28 5224.12 179.20 S 6777.71 W 5974419.52 N 364933.26 E 1.045 6308.97
9072.58 59.050 264.760 5220.42 5273.26 186.42 S 6859.10 W 5974413.70 N 364851.76 E 0.344 6383.00
9167.88 58.660 265.650 5269.71 5322.55 193.24 S 6940.37 W 5974408.27 N 364770.38 E 0.898 6457.06
9263.39 58.810 266.640 5319.28 5372.12 198.73 S 7021.83 W 5974404.18 N 364688.84 E 0.900 6531.74
9358.66 59.260 267.420 5368.30 5421.14 202.96 S 7103.41 W 5974401.34 N 364607.20 E 0.846 6606.97
9454.30 59.750 268.320 5416.83 5469.67 206.02 S 7185.76 W 5974399.69 N 364524.81 E 0.959 6683.33
9550.41 60.240 268.190 5464.90 5517.74 208.55 S 7268.95 W 5974398.58 N 364441.59 E 0.523 6760.65
9645.56 60.170 267.990 5512.18 5565.02 211.31 S 7351.48 W 5974397.24 N 364359.02 E 0.197 6837.28
9741.12 59.990 266.860 5559.84 5612.68 215.03 S 7434.21 W 5974394.93 N 364276.23 E 1.042 6913.77
9836.10 59.530 266.650 5607.68 5660.52 219.67 S 7516.14 W 5974391.69 N 364194.24 E 0.521 6989.18 .
9932.11 58.670 266.400 5656.98 5709.82 224.66 S 7598.37 W 5974388.11 N 364111.94 E 0.923 7064.76
10027.76 58.270 265.180 5707.00 5759.84 230.65 S 7679.68 W 5974383.51 N 364030.54 E 1.165 7139.14
10123.37 58.260 265.690 5757.29 5810.13 237.12 S 7760.73 W 5974378.43 N 363949.39 E 0.454 7213.11
10218.84 58.020 266.390 5807.69 5860.53 242.72 S 7841.62 W 5974374.21 N 363868.41 E 0.672 7287.22
10314.51 58.090 266.580 5858.31 5911.15 247.70 S 7922.65 W 5974370.62 N 363787.31 E 0.184 7361.68
10410.35 58.330 265.920 5908.80 5961.64 253.03 S 8003.94 W 5974366.69 N 363705.94 E 0.637 7436.26
10506.24 59.330 266.540 5958.43 6011.27 258.42 S 8085.81 W 5974362.70 N 363623.99 E 1.181 7511.36
10601.97 60.100 268.450 6006.71 6059.55 262.02 S 8168.39 W 5974360.50 N 363541.36 E 1.901 7587.75
10696.52 60.540 269.110 6053.52 6106.36 263.77 S 8250.51 W 5974360.16 N 363459.22 E 0.764 7664.34
10792.48 60.690 268.330 6100.61 6153.45 265.64 S 8334.11 W 5974359.72 N 363375.61 E 0.725 7742.27
10887.42 60.330 268.050 6147.34 6200.18 268.25 S 8416.70 W 5974358.53 N 363292.98 E 0.458 7819.01
10983.24 60.530 267.940 6194.63 6247.47 271.17 S 8499.99 W 5974357.04 N 363209.65 E 0.231 7896.29
11078.47 60.390 268.070 6241.58 6294.42 274.05 S 8582.79 W 5974355.57 N 363126.81 E 0.189 7973.13
14 July, 2004 - 8:16 Page 2 of 6 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31
Your Ref: API 501032049300
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) CO 11 OOft)
11173.82 60.030 268.350 6288.95 6341.79 276.64 S 8665.50 W 5974354.40 N 363044.07 E 0.456 8049.98
11269.44 59.870 269.320 6336.84 6389.68 278.32 S 8748.25 W 5974354.13 N 362961.31 E 0.894 8127.18
11364.77 59.750 269.170 6384.78 6437.62 279.40 S 8830.64 W 5974354.46 N 362878.91 E 0.185 8204.25
11459.97 60.110 267.880 6432.48 6485.32 281.53 S 8913.00 W 5974353.74 N 362796.53 E 1.232 8280.93
11555.73 60.400 265.550 6479.99 6532.83 286.29 S 8996.00 W 5974350.40 N 362713.46 E 2.134 8357.31 .
11651.20 59.340 264.280 6527.92 6580.76 293.61 S 9078.24 W 5974344.49 N 362631 .10 E 1.599 8432.11
11746.75 59.100 264.650 6576.81 6629.65 301.53 S 9159.95 W 5974337.97 N 362549.27 E 0.417 8506.20
11842.31 58.680 264.620 6626.19 6679.03 309.17 S 9241.41 W 5974331.72 N 362467.70 E 0.440 8580.14
11938.12 58.770 264.840 6675.93 6728.77 316.70 S 9322.95 W 5974325.59 N 362386.04 E 0.218 8654.21
12032.57 58.180 265.570 6725.31 6778.15 323.43 S 9403.18 W 5974320.23 N 362305.71 E 0.908 8727.32
12128.18 58.040 266.770 6775.82 6828.66 328.85 S 9484.17 W 5974316.20 N 362224.63 E 1.076 8801.59
12223.23 58.180 271.220 6826.06 6878.90 330.26 S 9564.83 W 5974316.17 N 362143.96 E 3.978 8876.92
12319.40 60.170 275.980 6875.35 6928.19 325.04 S 9647.21 W 5974322.79 N 362061.68 E 4.727 8956.13
12414.94 62.000 286.290 6921.64 6974.48 308.86 S 9729.09 W 5974340.37 N 361980.09 E 9.635 9038.61
12510.64 62.710 291.050 6966.07 7018.91 281.72 S 9809.36 W 5974368.88 N 361900.29 E 4.468 9123.33
12606.23 63.940 293.410 7008.98 7061.82 249.40 S 9888.42 W 5974402.55 N 361821.80 E 2.554 9208.66
12701.58 66.260 295.970 7049.13 7101.97 213.27 S 9966.98 W 5974440.02 N 361743.87 E 3.442 9294.84
12797.36 69.400 297.030 7085.27 7138.11 173.69 S 10046.34 W 5974480.96 N 361665.20 E 3.435 9382.95
12892.02 72.970 299.510 7115.80 7168.64 131.24S 10125.22 W 5974524.74 N 361587.05 E 4.513 9471.59
12987.76 73.860 304.040 7143.14 7195.98 82.93 S 10203.20 W 5974574.38 N 361509.91 E 4.629 9561.37
13081.54 73.610 306.050 7169.41 7222.25 31 .24 S 10276.90 W 5974627.33 N 361437.11 E 2.075 9648.30
13179.13 73.930 304.840 7196.68 7249.52 23.10 N 10353.24 W 5974682.96 N 361361.71 E 1.235 9738.60 .
13274.43 75.400 308.380 7221.89 7274.73 77.90 N 10426.99 W 5974739.02 N 361288.91 E 3.900 9826.64
13366.95 76.930 311.670 7244.02 7296.86 135.67 N 10495.76 W 5974797.96 N 361221.13 E 3.828 9911.01
13462.63 78.690 316.330 7264.24 7317.08 200.63 N 10563.01 W 5974864.05 N 361155.01 E 5.103 9996.39
13533.65 80.320 318.950 7277.17 7330.01 252.22 N 10610.05 W 5974916.45 N 361108.86 E 4.292 10058.23
13598.62 82.780 320.870 7286.72 7339.56 301.38 N 10651.43 W 5974966.31 N 361068.33 E 4.783 10113.91
13694.35 87.050 323.700 7295.21 7348.05 376.79 N 10709.73 W 5975042.71 N 361011.32E 5.344 10194.46
13789.54 90.880 324.330 7296.93 7349.77 453.79 N 10765.64 W 5975120.65 N 360956.74 E 4.078 10273.31
13885.23 94.220 325.520 7292.67 7345.51 532.01 N 10820.57 W 5975199.80 N 360903.16 E 3.705 10351.64
13980.96 93.660 329.120 7286.09 7338.93 612.39 N 10872.13 W 5975281.04 N 360852.98 E 3.797 10427.55
14076.73 89.210 330.620 7283.69 7336.53 695.17 N 10920.17 W 5975364.63 N 360806.36 E 4.903 10500.98
14171.86 90.450 329.600 7283.97 7336.81 777.64 N 10967.58 W 5975447.91 N 360760.37 E 1.688 10573.70
14267.46 90.700 329.650 7283.01 7335.85 860.11 N 11015.91 W 5975531.19 N 360713.45 E 0.267 10647.30
14362.98 91.260 330.350 7281.38 7334.22 942.82 N 11063.67 W 5975614.71 N 360667.12 E 0.938 10720.43
14 July, 2004 - 8:16 Page 3 of 6 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 . CD2-31
Your Ref: API 501032049300
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
14457.69 90.700 332.220 7279.76 7332.60 1025.87 N 11109.16W 5975698.52 N 360623.06 E 2.061 10791.55
14553.76 91.560 332.070 7277.87 7330.71 1110.79 N 11154.04 W 5975784.20 N 360579.64 E 0.909 10862.73
14649.34 88.290 333.000 7277.99 7330.83 1195.59 N 11198.12W 5975869.74 N 360537.02 E 3.557 10933.12
14744.44 88.420 332.470 7280.72 7333.56 1280.09 N 11241.66 W 5975954.97 N 360494.92 E 0.574 11002.91
14840.50 89.150 332.320 7282.76 7335.60 1365.19 N 11286.16 W 5976040.82 N 360451.88 E 0.776 11073.80 .
14934.74 90.210 332.990 7283.28 7336.12 1448.90 N 11329.45 W 5976125.26 N 360410.03 E 1.331 11143.07
15030.46 91.130 333.590 7282.16 7335.00 1534.40 N 11372.47 W 5976211.48 N 360368.48 E 1.147 11212.70
15125.90 92.730 333.810 7278.95 7331.79 1619.91 N 11414.73 W 5976297.70 N 360327.69 E 1.692 11281.63
15221.57 93.290 333.940 7273.93 7326.77 1705.68 N 11456.80 W 5976384.18 N 360287.10 E 0.601 11350.46
15317.07 93.100 333.680 7268.60 7321.44 1791.24 N 11498.89 W 5976470.45 N 360246.48 E 0.337 11419.24
15412.51 91 .430 333.440 7264.83 7317.67 1876.63 N 11541.35 W 5976556.55 N 360205.49 E 1.768 11488.31
15508.13 91.740 332.880 7262.19 7315.03 1961.92 N 11584.50 W 5976642.56 N 360163.80 E 0.669 11557.99
15603.99 90.820 330.880 7260.05 7312.89 2046.44 N 11629.67W 5976727.84 N 360120.08 E 2.296 11629.31
15699.04 90.320 330.970 7259.10 7311.94 2129.50 N 11675.86 W 5976811.69 N 360075.33 E 0.534 11701.09
15794.78 89.150 331.340 7259.54 7312.38 2213.36 N 11722.04 W 5976896.33 N 360030.58 E 1.282 11773.14
15890.61 89.770 331.000 7260.45 7313.29 2297.31 N 11768.25 W 5976981.05 N 359985.81 E 0.738 11845.24
15986.44 90.460 331.110 7260.25 7313.09 2381.17 N 11814.63 W 5977065.69 N 359940.88 E 0.729 11917.47
16082.00 91.010 331.100 7259.03 7311.87 2464.83 N 11860.80 W 5977150.13 N 359896.14 E 0.576 11989.44
16176.31 91.740 331.190 7256.77 7309.61 2547.40 N 11906.30 W 5977233.47 N 359852.06 E 0.780 12060.40
16272.23 90.390 331.360 7254.98 7307.82 2631.50 N 11952.39 W 5977318.34 N 359807.42 E 1.419 12132.45
16365.68 90.940 331.120 7253.90 7306.74 2713.42 N 11997.35 W 5977401.02 N 359763.87 E 0.642 12202.68
16461.12 89.650 331.930 7253.41 7306.25 2797.31 N 12042.85 W 5977485.67 N 359719.81 E 1.596 12274.09 .
16558.30 89.340 331.130 7254.26 7307.10 2882.73 N 12089.18 W 5977571.88 N 359674.95 E 0.883 12346.81
16654.05 90.020 331.030 7254.80 7307.64 2966.54 N 12135.48 W 5977656.47 N 359630.09 E 0.718 12418.95
16747.20 90.260 330.170 7254.57 7307.41 3047.69 N 12181.21 W 5977738.39 N 359585.76 E 0.959 12489.64
16843.12 90.630 329.630 7253.83 7306.67 3130.67 N 12229.31 W 5977822.18 N 359539.08 E 0.682 12563.19
16939.80 88.980 331.540 7254.15 7306.99 3214.88 N 12276.79 W 5977907.19 N 359493.05 E 2.611 12636.58
17035.46 89.340 331.300 7255.56 7308.40 3298.88 N 12322.55 W 5977991.96 N 359448.74 E 0.452 12708.27
17130.81 88.530 332.800 7257.33 7310.17 3383.09 N 12367.23 W 5978076.92 N 359405.50 E 1.788 12779.02
17226.33 88.970 332.620 7259.41 7312.25 3467.96 N 12411.01 W 5978162.52 N 359363.18 E 0.498 12849.16
17321.88 89.520 332.920 7260.67 7313.51 3552.91 N 12454.73 W 5978248.21 N 359320.92 E 0.656 12919.26
17417.25 90.020 332.310 7261.05 7313.89 3637.59 N 12498.59 W 5978333.63 N 359278.51 E 0.827 12989.41
17510.94 90.390 331.760 7260.72 7313.56 3720.34 N 12542.53 W 5978417.12 N 359236.00 E 0.708 13058.97
17606.48 91.000 331.610 7259.56 7312.40 3804.44 N 12587.84 W 5978501.99 N 359192.13 E 0.657 13130.28
17700.90 90.080 331.570 7258.67 7311.51 3887.49 N 12632.76 W 5978585.79 N 359148.64 E 0.975 13200.86
14 July, 2004 - 8:16 Page 4 of 6 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31
Your Ref: API 501032049300
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
17796.72 90.510 330.270 7258.18 7311.02 3971.22 N 12679.33 W 5978670.31 N 359103.51 E
17890.92 89.090 331.510 7258.51 7311.35 4053.52 N 12725.16 W 5978753.38 N 359059.10 E
17989.77 89.900 331 .260 7259.38 7312.22 4140.29 N 12772.49 W 5978840.95 N 359013.25 E
18085.12 90.520 330.790 7259.03 7311.87 4223.71 N 12818.68 W 5978925.14 N 358968.49 E
v 18131.00 90.520 330.790 7258.61 .,/ 7311.45 4263.75 N 12841.07 W 5978965.56 N 358946.79 E
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 289.970° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 18131.00ft.,
The Bottom Hole Displacement is 13530.44ft., in the Direction of 288.368° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7956.83
8021.41
18131.00
134.88 S
142.21 S
4263.75 N
Tie On Point
Window Point
Projected Survey
4689.56
4724.73
7311.45
5911.10W
5964.77 W
12841.07 W
North Slope, Alaska
Dogleg Vertical
Rate Section Comment
(0/100ft)
1 .429 13273.23
2.001 13344.40
0.858 13418.53
0.816 13490.43
0.000 13525.15 Projected Survey .
.
14 July, 2004 - 8:16
Page 5 of 6
DrillQuest 3.03.06.002
Alaska North Slope
Survey tool program for CD2-31
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
0.00
712.00
0.00
709.81
To
Measured Vertical
Depth Depth
(ft) (ft)
712.00
18131.00
709.81
7311.45
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2·31
Your Ref: API 501032049300
Job No. AKZZ0003109992, Surveyed: 24 June, 2004
North Slope, Alaska
Survey Tool Description
CB-SS-Gyro (CD2-31 PB1)
MWD+IIFR+MS+SAG (CD2-31 PB1)
.
.
14 July, 2004 - 8:16
Page 6 of 6
Dril/Quest 3.03.06.002
.
.
16-Jul-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD2-31 PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
13,245.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
DateJCn \"'~ ~ Signed
??LUJ OfLI
I
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
:iÀ?!() 'vf-,03'·2-
Attachment(s)
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-31PB1
.
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
Survey Report
14 July, 2004
Your Ref: API 501032049370
Surface Coordinates: 5974482.74 N, 371713.04 E (70020' 18.6650" N, 151002'27.5128" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid)
Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True)
Kelly Bushing Elevation: 52. 84ft above Mean Sea Level
Kelly Bushing Elevation: 52. 84ft above Project V Reference
Kelly Bushing Elevation: 52. 84ft above Structure
spe..........y-suil'!
DFUL.L.ING SERVICES
A Halliburton Company
SurveyRe~svy405
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.84 0.00 0.00 N 0.00 E 5974482.74 N 371713.04 E 0.00 CB-SS-Gyro
78.00 0.400 23.000 25.16 78.00 0.25 N 0.11 E 5974482.99 N 371713.15 E 0.513 -0.01
170.00 0.200 295.000 117.16 170.00 0.61 N 0.09 E 5974483.35 N 371713.14 E 0.479 0.13
263.00 0.300 222.000 210.16 263.00 0.50 N 0.22W 5974483.25 N 371712.82 E 0.331 0.38
353.00 1.000 297.000 300.15 352.99 0.68 N 1.08W 5974483.44 N 371711.97 E 1.074 1.25 .
443.00 4.150 302.000 390.05 442.89 2.77 N 4.54W 5974485.58 N 371708.54 E 3.506 5.21
534.00 5.400 290.000 480.73 533.57 5.98 N 11.36 W 5974488.91 N 371701.78 E 1.751 12.72
623.00 7.800 274.000 569.15 621.99 7.83 N 21.32 W 5974490.93 N 371691.85 E 3.373 22.71
712.00 10.800 266.000 656.97 709.81 7.67 N 35.67 W 5974491.02 N 371677.51 E 3.663 36.14 MWD+IIFR+MS+SAG
792.16 11 .190 267.220 735.66 788.50 6.77 N 50.93 W 5974490.38 N 371662.23 E 0.567 50.18
834.97 12.600 264.480 777.55 830.39 6.12 N 59.73 W 5974489.88 N 371653.43 E 3.547 58.22
924.52 15.480 266.460 864.41 917.25 4.44 N 81.38 W 5974488.57 N 371631.75 E 3.260 78.00
1019.76 21.130 269.440 954.80 1007.64 3.49 N 111.26 W 5974488.13 N 371601.86 E 6.011 105.76
1114.92 27.250 270.530 1041.56 1094.40 3.52 N 150.23 W 5974488.83 N 371562.89 E 6.448 142.40
1208.98 32.860 268.220 1122.95 1175.79 2.93 N 197.31 W 5974489.04 N 371515.81 E 6.089 186.44
1304.65 34.700 266.760 1202.46 1255.30 0.58 N 250.44 W 5974487.61 N 371462.64 E 2.102 235.58
1400.37 37.100 267.850 1280.00 1332.84 2.04S 306.50 W 5974485.94 N 371406.55 E 2.595 287.38
1495.23 41 .460 268.440 1353.41 1406.25 3.97 S 366.51 W 5974485.04 N 371346.51 E 4.613 343.12
1590.73 45.170 269.010 1422.88 1475.72 5.42 S 432.00 W 5974484.71 N 371281.01 E 3.906 404.17
1686.37 48.020 268.830 1488.59 1541.43 6.73 S 501.46 W 5974484.59 N 371211.53 E 2.983 469.01
1780.65 51.240 267.490 1549.65 1602.49 9.06 S 573.24 W 5974483.49 N 371139.72 E 3.583 535.68
1876.17 55.230 266.940 1606.81 1659.65 12.78 S 649.66 W 5974481.07 N 371063.26 E 4.202 606.23 .
1971.57 58.600 268.110 1658.88 1711.72 16.22 S 729.50 W 5974479.00 N 370983.37 E 3.679 680.10
2066.87 60.390 266.040 1707.26 1760.10 20.42 S 811.49W 5974476.20 N 370901.32 E 2.651 755.73
2161.94 60.850 266.140 1753.90 1806.74 26.07 S 894.14 W 5974471.97 N 370818.58 E 0.492 831.48
2257.64 60.630 265.490 1800.68 1853.52 32.16 S 977.41 W 5974467.30 N 370735.22 E 0.636 907.66
2353.13 60.290 267.600 1847.76 1900.60 37.17 S 1060.33 W 5974463.71 N 370652.23 E 1.955 983.88
2448.59 59.710 267.080 1895.49 1948.33 41.01 S 1142.91 W 5974461.29 N 370569.60 E 0.769 1060.18
2543.66 61.290 267.720 1942.31 1995.15 44.76 S 1225.57 W 5974458.96 N 370486.89 E 1.762 1136.59
2639.10 61.550 266.940 1987.96 2040.80 48.66 S 1309.29 W 5974456.49 N 370403.11 E 0.768 1213.94
2733.58 61.200 267.980 2033.23 2086.07 52.34 S 1392.13 W 5974454.23 N 370320.21 E 1.035 1290.55
2828.97 61.810 268.140 2078.74 2131.58 55.18 S 1475.92 W 5974452.82 N 370236.39 E 0.656 1368.33
2924.20 59.960 269.340 2125.07 2177.91 57.01 S 1559.09 W 5974452.41 N 370153.20 E 2.233 1445.87
3019.69 60.300 269.560 2172.63 2225.47 57.81 S 1641.89 W 5974453.03 N 370070.40 E 0.408 1523.42
3115.56 60.400 269.900 2220.06 2272.90 58.20 S 1725.21 W 5974454.06 N 369987.09 E 0.325 1601.60
14 July, 2004 - 8:14 Page 2 of 7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3209.94 60.930 268.030 2266.30 2319.14 59.69 S 1807.47 W 5974453.98 N 369904.82 E 1.816 1678.40
3262.53 61.260 266.810 2291.72 2344.56 61.76 S 1853.46 W 5974452.70 N 369858.80 E 2.126 1720.92
3373.87 61.030 266.760 2345.45 2398.29 67.23 S 1950.82 W 5974448.89 N 369761.36 E 0.210 1810.56
3469.58 60.680 266.730 2392.06 2444.90 71.98 S 2034.28 W 5974445.58 N 369677.83 E 0.367 1887.38
3564.74 60.460 267.500 2438.82 2491.66 76.15 S 2117.05 W 5974442.82 N 369595.00 E 0.742 1963.75 .
3660.61 60.350 267.690 2486.17 2539.01 79.65 S 2200.34 W 5974440.75 N 369511.66 E 0.207 2040.84
3756.06 60.210 268.000 2533.49 2586.33 82.77 S 2283.18 W 5974439.05 N 369428.78 E 0.318 2117.63
3851.63 59.750 268.160 2581.30 2634.14 85.54 S 2365.88 W 5974437.69 N 369346.04 E 0.503 2194.41
3946.90 59.600 268.340 2629.40 2682.24 88.05 S 2448.07 W 5974436.59 N 369263.82 E 0.227 2270.80
4041.91 59.470 269.250 2677.58 2730.42 89.77 S 2529.95 W 5974436.26 N 369181.93 E 0.837 2347.17
4137.49 59.160 269.670 2726.35 2779.19 90.55 S 2612.14 W 5974436.90 N 369099.73 E 0.498 2424.15
4232.83 59.290 269.820 2775.13 2827.97 90.91 S 2694.06 W 5974437.93 N 369017.82 E 0.192 2501.02
4328.69 59.190 269.520 2824.16 2877.00 91.39 S 2776.43 W 5974438.87 N 368935.46 E 0.288 2578.27
4424.35 60.320 268.280 2872.35 2925.19 92.98 S 2859.05 W 5974438.69 N 368852.82 E 1.628 2655.38
4517.66 62.040 268.940 2917.33 2970.17 94.96 S 2940.77 W 5974438.11 N 368771.07 E 1.945 2731.52
4615.56 61.920 269.640 2963.32 3016.16 96.03 S 3027.19 W 5974438.52 N 368684.65 E 0.643 2812.37
4711.34 60.890 269.310 3009.16 3062.00 96.80 S 3111.28W 5974439.19 N 368600.56 E 1.117 2891.15
4805.90 60.220 269.670 3055.64 3108.48 97.53 S 3193.62 W 5974439.86 N 368518.22 E 0.782 2968.29
4901.41 60.380 269.000 3102.96 3155.80 98.49 S 3276.58 W 5974440.32 N 368435.25 E 0.632 3045.93
4996.70 60.510 269.720 3149.97 3202.81 99.42 S 3359.47 W 5974440.81 N 368352.37 E 0.671 3123.51
5092.46 60.150 269.830 3197.37 3250.21 99.75 S 3442.67 W 5974441.91 N 368269.17 E 0.389 3201.60
5187.64 59.650 269.540 3245.10 3297.94 100.20 S 3525.01 W 5974442.86 N 368186.83 E 0.588 3278.84 .
5283.32 59.000 269.480 3293.92 3346.76 100.90 S 3607.30 W 5974443.57 N 368104.54 E 0.681 3355.94
5378.99 58.690 269.690 3343.41 3396.25 101.50 S 3689.17 W 5974444.38 N 368022.67 E 0.375 3432.68
5475.40 58.440 270.860 3393.69 3446.53 101.10 S 3771.43 W 5974446.18 N 367940.43 E 1.067 3510.13
5569.84 57.810 270.620 3443.56 3496.40 1 00.Q7 S 3851.62 W 5974448.58 N 367860.27 E 0.701 3585.85
5665.09 57.550 270.600 3494.49 3547.33 99.21 S 3932.11 W 5974450.82 N 367779.81 E 0.274 3661.79
5760.69 57.540 271.450 3545.79 3598.63 97.77 S 4012.76 W 5974453.64 N 367699.19 E 0.750 3738.09
5855.70 57.560 271.000 3596.77 3649.61 96.05 S 4092.92 W 5974456.73 N 367619.08 E 0.400 3814.01
5951 .24 57.740 271.380 3647.89 3700.73 94.38 S 4173.61 W 5974459.78 N 367538.42 E 0.385 3890.43
6046.24 57.820 272.640 3698.55 3751.39 91.56 S 4253.93 W 5974463.98 N 367458.16 E 1.125 3966.88
6141.67 58.090 272.740 3749.18 3802.02 87.76 S 4334.73 W 5974469.15 N 367377.44 E 0.297 4044.12
6237.02 58.270 273.530 3799.45 3852.29 83.33 S 4415.63 W 5974474.97 N 367296.63 E 0.729 4121.67
6330.82 60.110 272.670 3847.50 3900.34 78.98 S 4496.07 W 5974480.70 N 367216.28 E 2.114 4198.75
6426.58 60.950 273.730 3894.61 3947.45 74.32 S 4579.31 W 5974486.78 N 367133.13 E 1.303 4278.58
14 July, 2004 - 8:14 Page 3 of 7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2· CD2-31PB1
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6523.77 60.860 273.880 3941 .87 3994.71 68.69 S 4664.04 W 5974493.86 N 367048.50 E 0.164 4360.15
6618.80 61.450 273.350 3987.71 4040.55 63.44 S 4747.12 W 5974500.53 N 366965.53 E 0.790 4440.02
6714.10 61.650 273.290 4033.11 4085.95 58.59 S 4830.77 W 5974506.81 N 366881.98 E 0.217 4520.29
6810.30 61.680 273.440 4078.77 4131.61 53.62 S 4915.30 W 5974513.23 N 366797.55 E 0.141 4601.44
6905.71 63.300 269.200 4122.86 4175.70 51.69 S 4999.87 W 5974516.60 N 366713.02 E 4.291 4681.58 .
7001.05 63.770 267.890 4165.35 4218.19 53.86 S 5085.18 W 5974515.89 N 366627.68 E 1.325 4761.03
7096.58 63.210 267.970 4207.99 4260.83 56.95 S 5170.61 W 5974514.26 N 366542.21 E 0.591 4840.26
7192.30 62.520 267.180 4251.64 4304.48 60.55 S 5255.72 W 5974512.12 N 366457.05 E 1.029 4919.02
7287.93 62.080 266.840 4296.10 4348.94 64.97 S 5340.28 W 5974509.15 N 366372.43 E 0.557 4996.99
7383.57 61.740 266.090 4341.13 4393.97 70.17 S 5424.49 W 5974505.39 N 366288.14 E 0.778 5074.36
7479.17 60.320 263.650 4387.44 4440.28 77.63 S 5507.78 W 5974499.35 N 366204.74 E 2.682 5150.09
7574.75 58.880 262.900 4435.80 4488.64 87.28 S 5589.65 W 5974491.10 N 366122.71 E 1.652 5223.74
7670.32 58.790 261.890 4485.26 4538.10 98.10 S 5670.71 W 5974481.67 N 366041.48 E 0.909 5296.23
7765.96 58.260 261.070 4535.20 4588.04 110.19 S 5751.37 W 5974470.97 N 365960.62 E 0.917 5367.92
7861.34 57.990 260.980 4585.57 4638.41 122.82 S 5831.38 W 5974459.70 N 365880.41 E 0.294 5438.80
7956.83 57.230 261.820 4636.72 4689.56 134.88 S 5911.10 W 5974449.01 N 365800.49 E 1.089 5509.61
8051.23 56.990 262.320 4687.98 4740.82 145.82 S 5989.61 W 5974439.42 N 365721.81 E 0.512 5579.67
8147.52 57.040 262.230 4740.40 4793.24 156.68 S 6069.65 W 5974429.93 N 365641.60 E 0.094 5651.18
8243.20 57.270 263.510 4792.30 4845.14 166.65 S 6149.41 W 5974421.32 N 365561.68 E 1.149 5722.74
8338.88 57.730 264.110 4843.71 4896.55 175.35 S 6229.64 W 5974413.99 N 365481.32 E 0.715 5795.17
8370.99 59.990 267.350 4860.31 4913.15 177.39 S 6257.04 W 5974412.43 N 365453.88 E 11.140 5820.23 .
8402.18 62.220 274.110 4875.40 4928.24 177.02 S 6284.32 W 5974413.26 N 365426.62 E 20.273 5845.99
8433.50 62.030 276.220 4890.04 4942.88 174.53 S 6311.89 W 5974416.22 N 365399.09 E 5.986 5872.76
8529.88 60.620 275.830 4936.29 4989.13 165.65 S 6395.98 W 5974426.54 N 365315.16 E 1.505 5954.82
8625.33 59.700 275.480 4983.78 5036.62 157.49 S 6478.37 W 5974436.10 N 365232.93 E 1.015 6035.05
8720.62 60.100 269.640 5031.60 5084.44 153.82 S 6560.67 W 5974441.18 N 365150.70 E 5.318 6113.65
8816.11 61.650 263.950 5078.11 5130.95 158.52 S 6643.90 W 5974437.92 N 365067.40 E 5.452 6190.28
8909.37 61.270 263.560 5122.66 5175.50 167.43 S 6725.34 W 5974430.40 N 364985.82 E 0.549 6263.78
9004.61 60.630 262.980 5168.91 5221.75 177.18 S 6808.03 W 5974422.06 N 364902.98 E 0.857 6338.16
9099.34 59.350 262.790 5216.29 5269.13 187.34 S 6889.43 W 5974413.29 N 364821.42 E 1.362 6411.19
9198.67 58.450 262.570 5267.60 5320.44 198.18 S 6973.78 W 5974403.90 N 364736.89 E 0.926 6486.78
9292.94 57.620 263.180 5317.50 5370.34 208.10 S 7053.14 W 5974395.34 N 364657.37 E 1.038 6557.98
9389.34 56.960 263.090 5369.59 5422.43 217.79 S 7133.67 W 5974387.02 N 364576.69 E 0.689 6630.35
9485.09 56.740 263.820 5421.95 5474.79 226.93 S 7213.31 W 5974379.25 N 364496.90 E 0.678 6702.09
9580.66 56.880 263.330 5474.27 5527.11 235.88 S 7292.79 W 5974371.66 N 364417.28 E 0.453 6773.73
14 July, 2004 - 8:14 Page 4 of 7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9676.04 57.170 263.460 5526.18 5579.02 245.09 S 7372.27 W 5974363.82 N 364337.65 E 0.325 6845.29
9771.46 57.120 264.100 5577.95 5630.79 253.77 S 7451.96 W 5974356.50 N 364257.83 E 0.566 6917.21
9866.78 57.100 264.800 5629.71 5682.55 261.51 S 7531.62 W 5974350.12 N 364178.04 E 0.617 6989.45
9962.39 57.030 266.130 5681.70 5734.54 267.86 S 7611.61 W 5974345.15 N 364097.96 E 1.170 7062.46
10058.09 57.270 267.970 5733.61 5786.45 271.99 S 7691.90 W 5974342.38 N 364017.61 E 1.635 7136.50 .
10153.22 57.650 267.700 5784.78 5837.62 275.02 S 7772.04 W 5974340.73 N 363937.43 E 0.466 7210.79
10248.93 58.060 268.520 5835.71 5888.55 277.69 S 7853.03 W 5974339.44 N 363856.41 E 0.842 7286.00
10280.31 59.770 271.090 5851.91 5904.75 277.78 S 7879.90 W 5974339.81 N 363829.54 E 8.881 7311.22
10311.83 62.070 275.170 5867.23 5920.07 276.27 S 7907.39 W 5974341.80 N 363802.08 E 13.460 7337.58
10344.01 61.900 276.030 5882.35 5935.19 273.49 S 7935.67 W 5974345.05 N 363773.85 E 2.418 7365.10
10436.78 60.710 276.380 5926.89 5979.73 264.70 S 8016.57 W 5974355.23 N 363693.12 E 1.325 7444.14
10535.08 60.800 273.480 5974.92 6027.76 257.33 S 8102.01 W 5974364.06 N 363607.82 E 2.576 7526.96
10566.93 61.150 268.250 5990.38 6043.22 256.91 S 8129.84 W 5974364.96 N 363580.00 E 14.399 7553.26
10598.40 61.240 264.730 6005.55 6058.39 258.60 S 8157.36 W 5974363.74 N 363552.45 E 9.805 7578.55
10630.70 60.740 264.370 6021.21 6074.05 261.28 S 8185.48 W 5974361.54 N 363524.29 E 1.829 7604.06
10662.47 60.460 263.670 6036.81 6089.65 264.17 S 8213.00 W 5974359.13 N 363496.72 E 2.112 7628.95
10694.33 59.550 262.780 6052.74 6105.58 267.42 S 8240.40 W 5974356.34 N 363469.27 E 3.743 7653.59
10726.18 59.140 262.410 6068.98 6121.82 270.95 S 8267.57 W 5974353.27 N 363442.04 E 1.630 7677.92
10821.68 59.250 262.200 6117.88 6170.72 281.93 S 8348.86 W 5974343.68 N 363360.58 E 0.221 7750.57
10916.54 59.160 263.380 6166.45 6219.29 292.16 S 8429.70 W 5974334.84 N 363279.57 E 1.073 7823.05
11010.53 59.330 263.930 6214.51 6267.35 301.09 S 8509.98 W 5974327.29 N 363199.16 E 0.534 7895.46
11107.44 58.970 263.930 6264.21 6317.05 309.89 S 8592.71 W 5974319.91 N 363116.29 E 0.371 7970.21 .
11203.25 58.670 265.600 6313.82 6366.66 317.37 S 8674.33 W 5974313.83 N 363034.55 E 1.524 8044.37
11298.46 58.270 266.440 6363.61 6416.45 323.00 S 8755.29 W 5974309.58 N 362953.51 E 0.861 8118.53
11394.25 58.790 267.260 6413.61 6466.45 327.49 S 8836.86 W 5974306.49 N 362871.87 E 0.910 8193.67
11489.58 58.490 266.830 6463.22 6516.06 331.68 S 8918.16 W 5974303.68 N 362790.51 E 0.497 8268.65
11585.35 58.330 266.810 6513.39 6566.23 336.21 S 8999.61 W 5974300.55 N 362708.99 E 0.168 8343.66
11680.87 57.920 268.420 6563.84 6616.68 339.59 S 9080.65 W 5974298.56 N 362627.91 E 1.494 8418.67
11776.13 58.180 269.100 6614.25 6667.09 341.34 S 9161 .46 W 5974298.19 N 362547.08 E 0.664 8494.02
11871.52 59.080 269.890 6663.90 6716.74 342.05 S 9242.90 W 5974298.87 N 362465.64 E 1.179 8570.32
11966.84 59.730 271.010 6712.42 6765.26 341 .40 S 9324.95 W 5974300.92 N 362383.61 E 1.220 8647.66
12062.80 60.400 271.030 6760.30 6813.14 339.92 S 9408.09 W 5974303.83 N 362300.51 E 0.698 8726.31
12158.31 59.870 271 .970 6807.86 6860.70 337.76 S 9490.89 W 5974307.41 N 362217.76 E 1.018 8804.86
12251.25 59.690 271.040 6854.64 6907.48 335.65 S 9571.17W 5974310.89 N 362137.53 E 0.886 8881.04
12348.66 60.040 270.880 6903.55 6956.39 334.24 S 9655.40 W 5974313.74 N 362053.33 E 0.386 8960.69
14 July, 2004 - 8:14 Page 5 of 7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/10aft)
12444.38 60.420 270.800 6951.07 7003.91 333.02 S 9738.48 W 5974316.38 N 361970.29 E 0.404 9039.19
12539.84 60.100 270.240 6998.43 7051.27 332.26 S 9821.36 W 5974318.55 N 361887.43 E 0.610 9117.34
12635.42 58.830 269.400 7046.99 7099.83 332.52 S 9903.69 W 5974319.71 N 361805.11 E 1.529 9194.63
12731.23 58.580 267.780 7096.76 7149.60 334.53 S 9985.53 W 5974319.09 N 361723.25 E 1 .468 9270.86
12826.42 57.780 266.670 7146.95 7199.79 338.44 S 10066.31 W 5974316.56 N 361642.41 E 1.299 9345.45 .
12922.05 57.010 266.510 7198.48 7251.32 343.24 S 10146.73 W 5974313.15 N 361561.92 E 0.817 9419.40
13017.50 56.980 267.000 7250.47 7303.31 347.77 S 10226.65 W 5974309.99 N 361481.94 E 0.432 9492.96
13113.03 56.400 268.280 7302.93 7355.77 351.06 S 10306.41 W 5974308.06 N 361402.13 E 1.274 9566.81
13172.00 56.120 267.650 7335.69 7388.53 352.80 S 10355.42 W 5974307.16 N 361353.10 E 1.007 9612.27
13245.00 56.120 267.650 7376.38 7429.22 355.28 S 10415.97 W 5974305.71 N 361292.51 E 0.000 9668.34 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 289.970° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13245.00ft.,
The Bottom Hole Displacement is 1 0422.03ft., in the Direction of 268.046° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
.
Comment
13245.00
7429.22
355.28 S
10415.97 W Projected Survey
14 July, 2004 - 8:14
Page 6 of 7
DrillQuest 3.03.06.002
Alaska North Slope
Survey tool program for CD2-31 PS1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
0.00
712.00
0.00
709.81
To
Measured Vertical
Depth Depth
(ft) (ft)
712.00
13245.00
709.81
7429.22
Halliburton Sperry-Sun
Survey Report for Alpine CD-2· CD2-31P81
Your Ref: API 501032049370
Job No. AKZZ0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Survey Tool Description
CB-SS-Gyro
MWD+IIFR+MS+SAG
.
.
14 July, 2004 . 8:14
Page 7 of 7
DrillQuest 3.03.06.002
.
.
16-Jul-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD2-31 PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
13,245.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
::Ojn~~9¡;L Signed LJ ðiLI
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~"O¥l--:O:~)....
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
Alpine CD-2
CD2-31PB1 MWD
.
Job No. AKMW0003109992, Surveyed: 12 June, 2004
Survey Report
13 July, 2004
:0
c')
("
_.
Your Ref: AP/501032049370
Surface Coordinates: 5974482.74 N, 371713.04 E (70· 20'18.6650" N, 151· 02' 27.5128" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
I
ð
C>()
V
Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid)
Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True)
Kelly Bushing Elevation: 52.84ft above Mean Sea Level
Kelly Bushing Elevation: 52.84ft above Project V Reference
Kel/y Bushing Elevation: 52.84ft above Structure
SpE!.F'""F'""'J-SU·1"1
DRIL.L.ING seRVices
A Halliburton Company
Survey Ref: svy413
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -52.84 0.00 0.00 N 0.00 E 5974482.74 N 371713.04 E 0.00 CB-SS-Gyro
78.00 0.400 23.000 25.16 78.00 0.25 N 0.11 E 5974482.99 N 371713.15 E 0.513 -0.01
170.00 0.200 295.000 117.16 170.00 0.61 N 0.09 E 5974483.35 N 371713.14 E 0.479 0.13
263.00 0.300 222.000 210.16 263.00 0.50 N 0.22W 5974483.25 N 371712.82 E 0.331 0.38
353.00 1.000 297.000 300.15 352.99 0.68 N 1.08W 5974483.44 N 371711.97 E 1.074 1.25 .
443.00 4.150 302.000 390.05 442.89 2.77 N 4.54W 5974485.58 N 371708.54 E 3.506 5.21
534.00 5.400 290.000 480.73 533.57 5.98 N 11.36 W 5974488.91 N 371701.78 E 1.751 12.72
623.00 7.800 274.000 569.15 621.99 7.83 N 21.32 W 5974490.93 N 371691.85 E 3.373 22.71
712.00 10.800 266.000 656.97 709.81 7.67 N 35.67 W 5974491.02 N 371677.51 E 3.663 36.14 MWD Magnetic
792.16 11.380 267.750 735.63 788.47 6.83 N 51.06 W 5974490.45 N 371662.10 E 0.837 50.33
834.97 12.790 264.950 777.49 830.33 6.25 N 60.00 W 5974490.02 N 371653.15 E 3.566 58.53
924.52 15.680 267.180 864.29 917.13 4.78N 81.97 W 5974488.93 N 371631.16 E 3.284 78.67
1019.76 21.340 270.120 954.56 1 007.40 4.19 N 112.18 W 5974488.84 N 371600.95 E 6.021 106.86
1114.92 27.480 271.360 1041.18 1094.02 4.74 N 151.48 W 5974490.08 N 371561.66 E 6.474 143.99
1208.98 33.100 268.620 1122.37 1175.21 4.64 N 198.89 W 5974490.78 N 371514.26 E 6.152 188.52
1304.65 34.950 266.470 1201.66 1254.50 2.32 N 252.36 W 5974489.38 N 371460.75 E 2.306 237.98
1400.37 37.350 267.650 1278.94 1331.78 0.56 S 308.75 W 5974487.47 N 371404.33 E 2.611 289.99
1495.23 41.720 268.260 1352.09 1404.93 2.69S 369.08 W 5974486.36 N 371343.97 E 4.625 345.97
1590.73 45.430 268.990 1421.26 1474.10 4.26S 434.88 W 5974485.92 N 371278.15 E 3.920 407.27
1686.37 48.290 268.920 1486.65 1539.49 5.53 S 504.64 W 5974485.84 N 371208.37 E 2.991 472.41
1780.65 51.510 267.320 1547.37 1600.21 7.92 S 576.71 W 5974484.69 N 371136.28 E 3.654 539.33
1876.17 55.500 267.010 1604.17 1657.01 11.73 S 653.39 W 5974482.20 N 371059.55 E 4.185 610.10 .
1971.57 58.880 268.060 1655.86 1708.70 15.16 S 733.48 W 5974480.13 N 370979.41 E 3.662 684.20
2066.87 60.660 266.950 1703.84 1756.68 18.75 S 815.74 W 5974477.95 N 370897.10 E 2.122 760.29
2161.94 61.140 266.960 1750.08 1802.92 23.16 S 898.69 W 5974474.96 N 370814.09 E 0.505 836.74
2257.64 60.910 265.010 1796.44 1849.28 29.02 S 982.20 W 5974470.53 N 370730.49 E 1.799 913.23
2353.13 60.580 267.550 1843.11 1895.95 34.43 S 1065.32 W 5974466.54 N 370647.28 E 2.346 989.51
2448.59 60.000 267.740 1890.42 1943.26 37.84 S 1148.17 W 5974464.55 N 370564.40 E 0.632 1066.21
2543.66 61.580 268.340 1936.82 1989.66 40.67 S 1231.09W 5974463.14 N 370481.43 E 1.751 1143.18
2639.10 61.830 267.640 1982.06 2034.90 43.62 S 1315.08 W 5974461.62 N 370397.41 E 0.697 1221.11
2733.58 61.490 269.320 2026.91 2079.75 45.83 S 1398.20 W 5974460.84 N 370314.26 E 1.606 1298.48
2828.97 62.110 270.140 2071.98 2124.82 46.22 S 1482.27 W 5974461.88 N 370230.20 E 0.998 1377.35
2924.20 60.240 270.190 2117.90 2170.74 45.98 S 1565.69 W 5974463.55 N 370146.79 E 1.964 1455.85
3019.69 60.580 271.180 2165.05 2217.89 44.99 S 1648.72 W 5974465.97 N 370063.79 E 0.969 1534.22
3115.56 60.680 271.870 2212.07 2264.91 42.77 S 1732.24 W 5974469.62 N 369980.32 E 0.636 1613.48
13 July, 2004· 16:56
Page 2 of7
DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3209.94 61.220 269.110 2257.90 2310.74 42.06 S 1814.73 W 5974471.73 N 369897.86 E 2.620 1691.25
3262.53 61.550 268.020 2283.09 2335.93 43.22 S 1860.88 W 5974471.36 N 369851.69 E 1.925 1734.23
3373.87 61.030 265.790 2336.58 2389.42 48.49 S 1958.38 W 5974467.76 N 369754.11 E 1.818 1824.07
3469.58 60.680 265.770 2383.19 2436.03 54.64 S 2041.75 W 5974463.04 N 369670.66 E 0.366 1900.32
3564.74 60.460 267.480 2429.95 2482.79 59.52 S 2124.48 W 5974459.58 N 369587.85 E 1.582 1976.41 .
3660.61 60.350 268.370 2477.30 2530.14 62.54 S 2207.79 W 5974457.98 N 369504.51 E 0.815 2053.68
3756.06 60.200 265.670 2524.64 2577.48 66.85 S 2290.55 W 5974455.09 N 369421.68 E 2.461 2130.00
3851.63 59.750 267.250 2572.46 2625.30 71.96 S 2373.14 W 5974451.39 N 369339.02 E 1.507 2205.87
3946.90 59.600 266.540 2620.56 2673.40 76.41 S 2455.25 W 5974448.35 N 369256.84 E 0.662 2281.52
4041.91 59.460 267.750 2668.74 2721.58 80.49 S 2537.03 W 5974445.67 N 369175.00 E 1.108 2357.00
4137.49 59.150 270.570 2717.54 2770.38 81.70 S 2619.20 W 5974445.86 N 369092.82 E 2.558 2433.81
4232.83 59.290 271.570 2766.33 2819.17 80.17 S 2701.10 W 5974448.79 N 369010.97 E 0.913 2511.30
4328.69 59.190 271.290 2815.36 2868.20 78.11 S 2783.44 W 5974452.26 N 368928.67 E 0.272 2589.40
4424.35 60.320 270.590 2863.54 2916.38 76.76 S 2866.07 W 5974455.03 N 368846.08 E 1.340 2667.52
4517.66 62.040 268.290 2908.52 2961.36 77.57 S 2947.81 W 5974455.61 N 368764.34 E 2.839 2744.07
4615.56 61.910 269.070 2954.52 3007.36 79.56 S 3034.20 W 5974455.10 N 368677.92 E 0.716 2824.59
4711.34 60.880 269.340 3000.38 3053.22 80.73 S 3118.28W 5974455.37 N 368593.83 E 1.103 2903.21
4805.90 60.220 272.150 3046.88 3099.72 79.67 S 3200.60 W 5974457.84 N 368511.54 E 2.680 2980.95
4901.41 60.380 271.330 3094.20 3147.04 77.15 S 3283.53 W 5974461.78 N 368428.67 E 0.764 3059.75
4996.70 60.500 271.710 3141.21 3194.05 74.95 S 3366.39 W 5974465.39 N 368345.86 E 0.369 3138.37
5092.46 60.150 272.030 3188.62 3241.46 72.24 S 3449.54 W 5974469.53 N 368262.77 E 0.467 3217.46
5187.64 59.640 270.300 3236.36 3289.20 70.56 S 3531.86 W 5974472.62 N 368180.49 E 1.661 3295.40 .
5283.32 59.000 273.300 3285.19 3338.03 67.98 S 3614.09 W 5974476.60 N 368098.31 E 2.778 3373.57
5378.99 58.680 271.360 3334.70 3387.54 64.65 S 3695.89 W 5974481.33 N 368016.59 E 1.767 3451.58
5475.40 58.430 272.040 3384.99 3437.83 62.21 S 3778.10 W 5974485.18 N 367934.43 E 0.655 3529.68
5569.84 57.810 270.500 3434.87 3487.71 60.43 S 3858.27 W 5974488.33 N 367854.30 E 1.532 3605.64
5665.09 57.540 270.560 3485.80 3538.64 59.69 S 3938.76 W 5974490.45 N 367773.84 E 0.288 3681.54
5760.69 57.530 274.600 3537.14 3589.98 56.06 S 4019.31 W 5974495.46 N 367693.36 E 3.565 3758.49
5855.70 57.560 272.010 3588.13 3640.97 51.44 S 4099.34 W 5974501.45 N 367613.42 E 2.300 3835.28
5951.24 57.730 272.190 3639.26 3692.10 48.48 S 4179.99 W 5974505.78 N 367532.83 E 0.239 3912.10
6046.24 57.820 274.770 3689.92 3742.76 43.60 S 4260.20 W 5974512.03 N 367452.72 E 2.299 3989.15
6141.67 58.090 272.460 3740.56 3793.40 38.50 S 4340.92 W 5974518.51 N 367372.10 E 2.071 4066.75
6237.02 58.270 275.470 3790.84 3843.68 32.90 S 4421.73 W 5974525.50 N 367291.40 E 2.689 4144.62
6330.82 60.110 272.050 3838.89 3891.73 27.64 S 4502.10 W 5974532.13 N 367211.13 E 3.695 4221.95
6426.58 60.950 275.470 3886.02 3938.86 22.16 S 4585.27 W 5974539.03 N 367128.07 E 3.231 4301.99
13 July, 2004 - 16:56
Page 3 of7
DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6523.77 60.860 273.560 3933.28 3986.12 15.48 S 4669.92 W 5974547.16 N 367043.54 E 1.720 4383.84
6618.80 61.450 274.970 3979.13 4031.97 9.29 S 4752.93 W 5974554.77 N 366960.65 E 1 .440 4463.97
6714.10 61.640 275.030 4024.53 4077.37 1.98 S 4836.40 W 5974563.50 N 366877.32 E 0.207 4544.91
6810.30 61.680 274.820 4070.20 4123.04 5.29 N 4920.75 W 5974572.21 N 366793.10 E 0.197 4626.68
6905.71 63.300 270.360 4114.29 4167.13 9.08 N 5005.26 W 5974577.46 N 366708.67 E 4.480 4707.40 .
7001.05 63.770 269.560 4156.77 4209.61 9.02 N 5090.61 W 5974578.86 N 366623.33 E 0.898 4787.60
7096.58 63.200 269.600 4199.42 4252.26 8.40 N 5176.08 W 5974579.69 N 366537.86 E 0.598 4867.72
7192.30 62.510 266.700 4243.10 4295.94 5.65N 5261.20 W 5974578.41 N 366452.70 E 2.791 4946.79
7287.93 62.070 266.430 4287.57 4340.41 0.58 N 5345.71 W 5974574.78 N 366368.12 E 0.524 5024.48
7383.57 61.730 266.530 4332.62 4385.46 4.60 S 5429.92 W 5974571.04 N 366283.84 E 0.367 5101.86
7479.17 60.320 263.680 4378.93 4431.77 11.72 S 5513.24 W 5974565.35 N 366200.41 E 2.996 5177.73
7574.75 58.870 264.710 4427.31 4480.15 20.06 S 5595.24 W 5974558.41 N 366118.27 E 1.779 5251.96
7670.32 58.790 262.000 4476.78 4529.62 29.52 S 5676.46 W 5974550.34 N 366036.91 E 2.428 5325.06
7765.96 58.260 260.840 4526.72 4579.56 41.69 S 5757.11 W 5974539.55 N 365956.06 E 1.174 5396.71
7861.34 57.990 262.450 4577.09 4629.93 53.46S 5837.24 W 5974529.16 N 365875.74 E 1.461 5468.00
7956.83 57.220 261.670 4628.25 4681.09 64.59 S 5917.10 W 5974519.39 N 365795.70 E 1.061 5539.25
8051.23 56.990 262.860 4679.52 4732.36 75.26 S 5995.64 W 5974510.06 N 365716.99 E 1.086 5609.43
8147.52 57.040 263.390 4731.94 4784.78 84.93 S 6075.83 W 5974501.77 N 365636.65 E 0.465 5681.49
8243.20 57.270 264.550 4783.83 4836.67 93.37 S 6155.76 W 5974494.70 N 365556.58 E 1.047 5753.74
8338.88 57.730 264.760 4835.24 4888.08 100.89 S 6236.11 W 5974488.55 N 365476.12 E 0.515 5826.68
8370.99 59.990 266.730 4851.85 4904.69 102.92 S 6263.51 W 5974486.99 N 365448.68 E 8.781 5851.75
8402.18 62.210 274.680 4866.94 4919.78 102.57 S 6290.78 W 5974487.81 N 365421.42 E 23.416 5877.50 .
8433.50 62.030 276.220 4881.58 4934.42 99.94 S 6318.34 W 5974490.91 N 365393.91 E 4.384 5904.30
8529.88 60.610 278.190 4927.84 4980.68 89.35 S 6402.22 W 5974502.94 N 365310.23 E 2.321 5986.75
8625.33 59.690 277.680 4975.35 5028.19 77.92 S 6484.21 W 5974515.77 N 365228.44 E 1.069 6067.72
8720.62 60.090 271.540 5023.19 5076.03 71.30 S 6566.32 W 5974523.79 N 365146.46 E 5.589 6147.15
8816.11 61.640 267.070 5069.69 5122.53 72.34 S 6649.69 W 5974524.18 N 365063.09 E 4.399 6225.15
8909.37 61.260 266.360 5114.27 5167.11 77.03 S 6731.47 W 5974520.88 N 364981.23 E 0.783 6300.41
9004.61 60.620 263.130 5160.54 5213.38 84.65 S 6814.36 W 5974514.69 N 364898.23 E 3.040 6375.71
9099.34 59.340 262.050 5207.93 5260.77 95.22 S 6895.69 W 5974505.51 N 364816.73 E 1.673 6448.54
9198.67 58.440 262.910 5259.25 5312.09 106.35 S 6980.00 W 5974495.82 N 364732.24 E 1.171 6523.98
9292.94 57.610 262.800 5309.17 5362.01 116.30 S 7059.35 W 5974487.23 N 364652.74 E 0.886 6595.16
9389.34 56.960 262.630 5361.27 5414.11 126.58 S 7139.80 W 5974478.33 N 364572.12 E 0.690 6667.26
9485.09 56.730 265.430 5413.65 5466.49 134.92 S 7219.51 W 5974471.35 N 364492.27 E 2.460 6739.34
9580.66 56.870 262.850 5465.98 5518.82 143.09 S 7299.05 W 5974464.55 N 364412.61 E 2.264 6811.31
13 July, 2004 - 16:56 Page 40f7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
9676.04 57.160 264.440 5517.91 5570.75 151.94 S 7378.57 W 5974457.06 N 364332.96 E 1.431 6883.01
9771.46 57.120 264.990 5569.69 5622.53 159.32 S 7458.38 W 5974451.04 N 364253.03 E 0.486 6955.50
9866.78 57.090 263.220 5621.46 5674.30 167.54 S 7537.99 W 5974444.18 N 364173.29 E 1.559 7027.52
9962.39 57.020 266.890 5673.46 5726.30 174.46 S 7617.90 W 5974438.64 N 364093.27 E 3.222 7100.27
10058.09 57.270 269.090 5725.39 5778.23 177.28 S 7698.24 W 5974437.19 N 364012.90 E 1.949 7174.81 .
10153.22 57.650 268.810 5776.56 5829.40 178.75 S 7778.42 W 5974437.10 N 363932.70 E 0.470 7249.67
10248.93 58.060 269.960 5827.48 5880.32 179.61 S 7859.45 W 5974437.62 N 363851.67 E 1.104 7325.53
10280.31 59.770 271.060 5843.68 5896.52 179.37 S 7886.32 W 5974438.32 N 363824.81 E 6.221 7350.87
10311.83 62.060 274.850 5859.01 5911.85 177.94 S 7913.82 W 5974440.22 N 363797.33 E 12.773 7377.20
10344.01 61.900 277.310 5874.13 5926.97 174.94 S 7942.06 W 5974443.71 N 363769.15 E 6.767 7404.77
1 0436.78 60.710 276.420 5918.67 5971.51 165.21 S 8022.85 W 5974454.82 N 363688.53 E 1.534 7484.03
10535.08 60.800 275.310 5966.70 6019.54 156.44 S 8108.17 W 5974465.04 N 363603.38 E 0.990 7567.21
10566.93 61.140 270.880 5982.16 6035.00 154.94 S 8135.97 W 5974467.02 N 363575.61 E 12.208 7593.85
10598.40 61.240 265.700 5997.33 6050.17 155.76 S 8163.52 W 5974466.67 N 363548.05 E 14.425 7619.46
10630.70 60.740 264.580 6013.00 6065.84 158.16 S 8191.67 W 5974464.76 N 363519.87 E 3.405 7645.10
1 0662.47 60.460 263.830 6028.59 6081.43 160.95 S 8219.20 W 5974462.43 N 363492.29 E 2.238 7670.03
10694.33 59.550 263.280 6044.52 6097.36 164.05 S 8246.62 W 5974459.81 N 363464.82 E 3.224 7694.74
10726.18 59.130 262.800 6060.76 6113.60 167.37 S 8273.82 W 5974456.95 N 363437.57 E 1.849 7719.16
10821.68 59.240 263.070 6109.68 6162.52 177.45 S 8355.21 W 5974448.26 N 363356.02 E 0.269 7792.22
10916.54 59.160 264.300 6158.26 6211.10 186.42 S 8436.20 W 5974440.68 N 363274.89 E 1.117 7865.27
11010.53 59.320 265.260 6206.33 6259.17 193.76 S 8516.63 W 5974434.71 N 363194.35 E 0.894 7938.36
11107.44 58.960 264.810 6256.04 6308.88 200.96 S 8599.50 W 5974428.93 N 363111.36 E 0.545 8013.79 .
11203.25 58.670 267.920 6305.66 6358.50 206.16 S 8681.29 W 5974425.13 N 363029.50 E 2.793 8088.89
11298.46 58.270 269.030 6355.45 6408.29 208.32 S 8762.41 W 5974424.36 N 362948.35 E 1.079 8164.39
11394.25 58.790 269.830 6405.46 6458.30 209.13 S 8844.11 W 5974424.95 N 362866.65 E 0.896 8240.90
11489.58 58.490 267.170 6455.07 6507.91 211.26 S 8925.47 W 5974424.21 N 362785.26 E 2.403 8316.64
11585.35 58.320 268.260 6505.25 6558.09 214.52 S 9006.98 W 5974422.35 N 362703.71 E 0.986 8392.14
11680.87 57.920 271.240 6555.71 6608.55 214.87 S 9088.07 W 5974423.38 N 362622.62 E 2.682 8468.24
11776.13 58.180 271.520 6606.12 6658.96 212.93 S 9168.88 W 5974426.71 N 362541.86 E 0.370 8544.85
11871.52 59.080 272.450 6655.77 6708.61 210.10 S 9250.27 W 5974430.93 N 362460.52 E 1.258 8622.31
11966.84 59.730 272.810 6704.29 6757.13 206.34 S 9332.24 W 5974436.09 N 362378.64 E 0.755 8700.64
12062.80 60.400 271.860 6752.17 6805.01 202.95 S 9415.33 W 5974440.90 N 362295.62 E 1.106 8779.88
12158.31 59.860 273.450 6799.74 6852.58 199.12 S 9498.05 W 5974446.15 N 362212.97 E 1.550 8858.95
12251.25 59.690 270.530 6846.54 6899.38 196.33 S 9578.30 W 5974450.31 N 362132.78 E 2.721 8935.32
12348.66 60.030 270.340 6895.45 6948.29 195.69 S 9662.54 W 5974452.39 N 362048.57 E 0.388 9014.71
13 July, 2004 - 16:56 Page 5 of7 DrillQuest 3.03.06.002
Halliburton Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
12444.38 60.420 270.140 6942.98 6995.82 195.34 S 9745.62 W 5974454.16 N 361965.51 E 0.446 9092.91
12539.84 60.100 271.480 6990.34 7043.18 194.17 S 9828.49 W 5974456.75 N 361882.66 E 1.264 9171.21
12635.42 58.820 271.080 7038.90 7091.74 192.33 S 9910.79 W 5974460.00 N 361800.41 E 1.387 9249.19
12731.23 58.580 267.210 7088.69 7141.53 193.55 S 9992.62 W 5974460.18 N 361718.57 E 3.460 9325.68
12826.42 57.770 266.160 7138.89 7191.73 198.22 S 10073.37 W 5974456.89 N 361637.76 E 1.266 9399.97 .
12922.05 57.000 267.100 7190.43 7243.27 202.96 S 10153.77 W 5974453.53 N 361557.28 E 1.155 9473.93
13017.50 56.980 266.990 7242.43 7295.27 207.09 S 10233.71 W 5974450.77 N 361477.28 E 0.099 9547.65
13113.03 56.390 269.920 7294.91 7347.75 209.24 S 10313.50 W 5974449.98 N 361397.47 E 2.636 9621.90
13172.00 56.120 268.010 7327.67 7380.51 210.13 S 10362.52 W 5974449.93 N 361348.44 E 2.732 9667.67
13245.00 56.120 268.010 7368.36 7421.20 212.23 S 10423.09 W 5974448.86 N 361287.85 E 0.000 9723.88 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 289.970° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 13245.00ft.,
The Bottom Hole Displacement is 10425.25ft., in the Direction of 268.834° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
.
Comment
13245.00
7421.20
212.23 S
10423.09 W Projected Survey
13 July, 2004 - 16:56
Page 60f7
DrillQuest 3.03.06.002
Halliburlon Sperry-Sun
Survey Report for Alpine CD-2 - CD2-31PB1 MWD
Your Ref: API 501032049370
Job No. AKMW0003109992, Surveyed: 12 June, 2004
North Slope, Alaska
Alaska North Slope
Survey too/program for CD2-31 PB1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
712.00
0.00 712.00
709.81 13245.00
709.81 CB-SS-Gyro
7421.20 MWD Magnetic
.
.
13 July, 2004 - 16:56
Page 70f7
DrillQuest 3.03.06.002
Re: CD2-31 (204-082) plug back operations
.
Subject: Re: CD2-31 (204-082) plug back operations
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Mon, 14 Jun 2004 13:44:07 -0800
To: "Johnson, Vern" <Vern.Johnson@conocophillips.com>
CC: winton_aubert@admin.state.ak.us, "Kuenzler, Zane A"
<Zane.A.Kuenzler@conocophillips.com>, "Alvord, Chip" <Chip.Alvord@conocophillips.com>,
"Noel, Brian" <Brian.Noel@conocophillips.com>
.
Vern, et al:
Winton and I have discussed this matter and we conclude that no sundry notice will
be required for this activity. You will be accomplishing the operations which you
described in you application, although the plug back depth will be shallower due to
the high dog-legs. This is a mechanical consideration and such operations have not
traditionally required a sundry.
Since there will now be some length between the plugs, attention must be given to
the placement of the deep plug. Commission practice has been to waive witnessing
the tag of a deep plug when it is set on bottom and no problems such as lost
circulation are encountered. If the placement of the bottom plug is suspect, plans
should be made to tag the TOC and verify its location. Performing the sidetrack
will accomplish the tag of the second plug.
You have approval to proceed with your operations as planned. Please call with any
questions.
Tom Maunder, PE
AOGCC
Johnson, Vern wrote:
Tom/Winton,
This weekend we changed the plan for drilling and plugback operations on CD2-31.
The original plan was to drill 8-1/2" pilot hole through the Alpine for logging
purposes, then plug back with a continuous plug from TD to ± 12100' MD. Then the
well was to be sidetracked and landed horizontally in the Alpine reservoir.
While drilling the pilot hole at ± 8300' MD, several unexpected high dogleg (up
to 20°/100) sections were drilled. The decision was made to move the kick off
point and plug back depth up hole to mitigate problems associated with the high
dog leg. The revised plan was to place a plug on bottom to isolate the Alpine
(planned TOC 12745' MD, 242' MD above the top Alpine C). A second plug was to be
placed from ± 8500 to 8000' MD to be used as a kick off plug. There are no
significant hydrocarbon bearing zones between the plugs.
I spoke to Winton Saturday afternoon, we discussed the plan and he gave verbal
approval to continue. He suggested that I follow up with an email today.
Let me know if you have any questions, or if you need further paperwork on this
issue.
Vern Johnson
CPAI Alpine Drilling
907-265-6081 (w)
907-748-3906 (c)
907-265-1515 (fx)
«Johnson, Vern.vcf»
I of I
6/21/2004 I :57 PM
.
.
FRANK H. MURKOWSKI, GOVERNOR
AI1ASIiA. OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'H AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
C. Alvord
Alpine Drilling Team Leader
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Re: Colville River CD2-31 & CD2-31PBl
ConocoPhillips Alaska, Inc.
Permit No: 204-082
Surface Location: 1875' FNL, 1526' FEL, SEe. 2, TIIN, R4E, UM
Bottomhole Location: 2420' FNL, 1255' FWL, SEe. 33, T12N, R4E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must
be clearly differentiated in both name CD2-31PH and API number 50-103-20493-70 :&om
records, data and logs acquired for Colville River well CD2- 31.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 9 7 (pager).
BY ORDER qf. .1HE COMMISSION
DATED thisL.2{day of May, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~.
'tECEIVED
MAY 1 4 2004
ßsJ
1\'6
STATE OF ALASKA
ALASKA OIL & GAS COMMISSION
PERMIT TO DRILL
1a. Type of Work: Drill ~ Redrill [J
Re-entry 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
1b. Current Well Class:
Stratigraphic Test 0
P.O. Box 100360 Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface: 1875' FNL, 1526' FEL, Sec. 2, T11 N, R4E, UM /
Top of Productive Horizon:
1495'FNL, 1694'FEL,Sec.4, T11N, R4E, UM
Total Depth:
2420' FNL, 1255' FWL, Sec. 33, T12N, R4E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 371713.04
16. Deviated wells:
Kickoff depth: 400 ¡
18. Casing Program
Size
Hole
42"
12.25"
8.5"
6.125"
6.125
Casing
16"
9.625"
7"
3.5"
4.5
19
Total Depth MD (It):
Casing
Structural
Conductor
Detailed Operations
Intermediate
Production
Uner
Perforation Depth MD (ft):
20. Attachments: Filing Fee 0
Property Plat 0
/
./
y- 5974482.7 Zone-
ft.
Maximum Hole Angle:
91°
Soecifications
Weight Grade Coupling Length
62.5# H-40 Weld 77'
36# J-55 BTC 3272
26# L-80 BTC-M 13700'
9.3# L-80 EUE-M 13512'
12.6# L-80 IBT-M 5135
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (It): Plugs (measured)
Length
Size
BOP SketchL:)
Diverter Sketch 0
Drilling program~
Seabed Report 0
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name ~.. C. Alvord
Signature d~ r). V7 ~
ExploratoryU Alas¡Br~ftP&e[1J¡§'~ 8Tns. CommÎ~~ Zone 0
Service 0 Developmegt Gas r¡' Single Zone 0
5. Bond: ~ Blanket U Single wf1l1 VTlW1Iæñ Name and Number:
Bond No. 59-52-180 CD2-31 & CD2-31 PB1
6. Proposed Depth: 12. FieldlPool(s):
MD: 18682' TVD: 7247' Colville River Field
7. Property DeSignation~ . .A7.01
ADL 380075, 387207, ,1M f!t! ç. Álpine River Pool
8. Land Use Permit: /Vrl';..L 13. Approximate Spud Date:
6/4/2004
na
9. Acres in Property:
2560
14. Distance to
Nearest Property: 1255' FWL, Sec. 33
10. KB Elevation
15. Distance to Nearest
Well within Pool:
CD2-30 , 1945
4 (Height above GL): 52 feet
17. Anticipated Pressure (see 20 AAC 25.035)
Max. Downhole Pressure: 3324 psig I Max. Surface Pressure: 2561 psig
Setting Depth Quantity of Cement
Bottom c. f. or sacks
TVD MD TVD (including stage data)
37' 114' 114'
37' 3309' 2390' 613 sx AS Lite & 230 sx LiteCrete
37' 13737' 7345' (149 sx 11 ppg LiteCrete, 150 sx 15.8
32' 13544' 7330' ppg G) sx Class G
7329 18672 7310 uncemented
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (It): Effective Depth TVD (It): Junk (measured)
Top
MD
37'
37'
37'
32'
13537
Cement Volume
MD
TVD
Perforation Depth TVD (ft):
Time v. Depth Plot 0
Drilling Fluid Program 0
Date:
Shallow Hazard Analysis [J
20 AAC 25.050 requirements 0
Contact Vem Johnson @ 265-6081
Title Alpine Drilling Team Leader
Phone Zed- r.17tt Date 5/1'1/0'"(
r
r
Commission Use Only
Permit to Drill .. I I ... _ I API Num. ber: ..., . . . .. Permit APP. roval . / See cover letter
Number: 2.CJ Lf -Cß 2-t 50- /ó ::.) ~ æ L/ '13- Cø Date: 5, I ¿?J ¿¡ ¿.f- for other requirements
Conditions of approval: Samples required 0 Yes r;;;;rNo Mud log required ( 0 Yes g No
. _ J",~g," "lfide m~",," ~ Y". ¡¡¡¡NO 0;,""",0" :~Y '"";'~ ~Y" 0 No .
Other:~, -:f~/~~~ à()~~'-ðl>\a3S<",,\\.ð'. ß~oafS\ \~\~\~\J\V\ \Sà~ ~ \-
( (_ J. Vj./~_ BY ORDER OF "'-/,1>/-' /
Approvedl5'f: 'j V}<.(A COMMISSIONER THE COMMISSION Date: ~ /16)' bY'"
\...../ V '-- I 7 7
Form 10-401 Revised 3/2003, Submit In Duplicate ~
ORIGINAL
re
.
CD2-31 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
121/411H I 195/8"C
- oe - aSlna nterva
Event Risk Level Mitigation Strategy
Conductor Broach Low Monitor cellar continuously during interval.
Well Collision Low Gyro single shots as required
Gas Hydrates Low Monitor well at base of permafrost, increased mud
weight, decreased mud viscosity, increased
circulating times, controlled drilling rates, low mud
temperatures
Running Sands and Gravel Low Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Abnormal Pressure in Low Increase mud weight
Surface Formations /
>2000' TVD
Lost Circulation Low Reduce pump rates, mud rheology, lost circulation
material, use of low density cement slurries
8 1/2" H I 1 7" C I t
- oe aSI na n erva
Event Risk Level Mitigation Strategy
Abnormal Pressure in low BOPE drills, Keep mud weight above 9.6 ppg.
Surface Formations ./ Check for flow during connections and if needed,
>2000' TVD increase mud weight.
Lost circulation Low Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring, mud
rheology, lost circulation material
Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECD) monitoring, weighted
sweeps.
Abnormal Reservoir low Well control drills, increased mud weight. No
Pressure mapped faults occur within 700' of the planned
wellbore.
Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well
control practices, mud scavengers
6-1/8" Hole 1 Horizontal Production Hole
Event Risk Level
Lost circulation Low
Hydrogen Sulfide gas
Low
Miti ation Strate
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECD) monitoring, mud
rheolo ,lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECD)
monitorin , wei hted swee s.
BOPE drills, Keep mud weight above 8.8 ppg. .0/
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud wei ht.
H2S drills, detection systems, alarms, standard well
control ractices, mud scaven ers /
Hole swabbing on trips
Moderate
Abnormal Reservoir
Pressure
Medium .¡
.I
ORIGINAL
·
'.
Alpine: CD2-31 & CD2-31 PB1 Procedure
1. Move on Doyon 19.
2. Drill 12 1,4" hole to the surface casing point as per the directional plan.
3. Run and cement 9 5/8" surface casing.
4. Pressure test casing to 2500 psi.
5. Install and test BOPE to minimum 5000 psi.
6. Drill out 20' of new hole. Perform leak off test.
7. Drill 8-1/2" hole through the Alpine interval (LWD: GR/RES/DENSITY/POROSITYPWD) r/
8. Plug back the pilot hole with two cement plugs
9. Kick off the cement plug with 8-1/2" drilling assembly.
10. Drill 8 W' hole to the intermediate casing point in the Alpine Sand. (LWD tools, GR/RES/PWD)
./
11. Run and cement 7" casing as per program. Top of cement +1 500 feet MD above Albian 96 formation.
Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to
the casing shoe. Freeze protect casing annulus.
12. Pressure test casing to 3500 psi.
13. BOPE Test to 5000 psi.
14. Run drilling assembly. Drill out and perform FIT to 12.5 ppg EMW. Minimum acceptable leak off for drilling
ahead is 11.5 ppg.
15. Drill 6-1/8" horizontal section to well TD. (LWD: GR/RES/PWD)
16. Circulate the hole clean and POOH.
17. Pick up and run 4-1/2" 12.6 #, L-80 liner with perforated pup joints and centralization.
18. Pick up liner hanger and liner top packer. Run in hole on drill pipe.
19. Set liner hanger and liner top packer. Pull out of hole
20. Run 3-%", 9.3 #, L-80 tubing with SSSV nipple, gas lift mandrels, sliding sleeve and seal assembly. Space
out in liner top packer.
21. Sting in and land hanger.
22. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
23. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
24. Test tubing-casing annulus separately to 3500 psi I 30 mins.
25. Open CMPA sliding sleeve and circulate tubing and annulus to diesel.
26. Set BPV and secure well. Move rig off.
ORIGINAL
~
.
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD2-32 will be the closest well to CD2-31. Well separation is 11.9' @ 500' MD.
Accounting for survey uncertainties, the ellipse-to-ellipse separation is 2.4' @ 500' MD.
Drillina Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated. ¡/
Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular PumpinQ Operations:
Incidental fluids developed from drilling operations on well CD2-31 will be injected into a permitted annulus
on C02 pad or the class 2 disposal well on CD1 pad.
The CD2-31 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500' of cement fill above the top of the Alpine as per regulations.
Upon completion of CD2-31 form 10-403, Application for Sundry Operations, will be filed. Annular pumping
of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly
permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating
annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within
one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers
in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick
shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
OD (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1 ,717 psi 3,520 psi 2.992 psi
7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 psi 7,240 psi 6,154 psi
ORfGINAL
/.
.
CD2-31
DRILLING FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 W' Section - 6 1/8"
point - 12 W'
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 8.1-8.8 ppg v
PV 10 - 25 10 -15
YP 20 - 60 15 - 25 25-30
Funnel Viscosity 100 - 200
Initial Gels 4-8 10-15
10 minute gels <18 12-20
API Filtrate NC - 10 cc I 30 min 4 - 12 cc/30 min (drilling) NA
HPHT Fluid Loss at 160 12-14 cc/30 min
PH 8.5-9.0 9.0 -10.0 9.0-9.5
KCL 6%
Oil Iwater ratio Approx. 80/20
Suñace Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining well bore stability.
Production Hole Section :
The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based
drill-in fluid. The base fluid will consist of high flashpoint (>200 F) mineral oil with 25% by weight calcium
chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation
damage.
ORIGINAL
Colville River Field
CD2-31 PH Pilot Hole - Prior to Sidetracking
RKB - GL = 37'
Wellhead
16" Conductor to 114'
9-5/8" 36 ppf J-55 BTC
Surface Casing
@ 3309' MD I 2390' TVD
cemented to surface
9.8 ppg drilling mud in hole
PluQ #2: 600' (11915' 11II1:1), 17 PPQ~ºco¥~r tòeHRZ
when in place (HRZ toe at +1-12291' Mp16933' TVe)
Cement Plug
Top of cement plug dressed
off to 12160' MD / 6866' TVD
(+/- 59.6º inc.)
Top Alpine Reservoir at
13034' MD / 7309' TVD
Top of Cement Plug #1 at +/- 12515' MDI 7035' TVD
Pilot Hole TD at 13515' MD / 7552' TVD
(+/- 59.6º inc.)
II
Colville River Field
CD2-31 Production Well Completion Plan
16" Conductor to 114'
3-16" x 4-16" cross-over, 2 jts below 4-16 Dhanger
3-1/2" Camco TRM-4E SSSV Nipple (2.813" ID) at 1900' TVD=2342' MD
-2.813" X-Over
-Single 1j.¡"xO.049" 5/5 control line
9-5/8" 36 ppf J-55 BTC
Surface Casing
@ 3314' MD / 2390' TVD
cemented to surface
Cameo KBG-2 GLM (2.867" 10)
at 3400' TVD for
E Dummy with 1" BK-2 Latch
3-1/2" 9.3 ppf L-80 EUEM R3
tubing run with Jet Lube Run'n'Seal
pipe dope
Cameo KBG-2 GLM (2.867" ID)
at 5700' TVD for
E Dummy with 1" BK-2 Latch
Cameo KBG-2 GLM (2.867" 10)
2 joints above sliding sleeve
E Dummy with 1" BK-2 Latch
Baker 3-%" CMD sliding sleeve
with 2.81 "[)([::Profile set 2
joints above Seal assembly
Packer Fh,Jid mix:
Diesel in tubing and annulus
Upper Completion MD TVD
Tubing Hanger 32' 32'
4-W' 12.6 #/ft IBT-Mod Tubing (2)
Crossover
3-1/2", 9.3#/ft, EUE-Mod Tubing
Camco BAL-O SSSV Nipple 2340' 1900'
3-1/2", 9.3#/ft, EUE-Mod Tubing
Camco KBG-2 GLM (2.867" ID) 5306' 3400'
3-1/2", 9.3#/ft, EUE-Mod Tubing
Camco KBG-2 GLM (2.867" ID) 9854' 5100'
3-1/2", 9.3#/ft, EUE-Mod Tubing
Camco KBG-2 GLM (2.867" ID) 12400' 6983'
3-1/2" tubing joints (2)
Baker 3-1/2" CMPA sliding sleeve 12500' 1028'
wI 2.81 " X Profile
3-1/2", 9.3#/ft, 1ST-Mod Tubing
Seal assembly and no-go shoulder 13534' 7329'
Muleshoe 13544' 7330'
Lower ComDh;!tion
ZXP liner top packer 13531' 1329'
Flexloc liner hanger 13547' 7330
4-W', 12.6 #/ft, IBTM tubing 2 jts
HES "XN" (2.75" ID) 13647' 7340'
4-]6",12.6 #/ft, ISTM tubing
Perforated pups 1 per 4 jtts
Baker guide shoe 18672' 7310'
Baker ZXP liner top packer Flexloc
liner hanger+/- 13537' MD
+/-200 MD from the 7" casing shoe
TOC @ +/- 9838' MD / 5692' TVD
(500' MD above top Albian 96)
7" 26 ppf L-80 BTC Mod
Production Casing @
13737' MD / 7345' TVD
@ 85º
I 1
Well TD at
18682' MD !
7310' TVD
4- W' 12.6#/ft L-80 ISTM liner, 1 5ft
perforated pup with rigid straight
centralizer per 4 joints
.
.
CD2-31
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (Ibs. I (psi) (psi)
MDfTVD(ft) gal)
16 114/114 10.9 52 53
9 5/8 3309 I 2390 14.5 1081 1525
7" 13737 I 7345 16.0 3324 2590
N/A 18682 I 7310 16.0 3308 ./ N/A
. NOTE: The Doyon 195000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib.lgal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1081 - (0.1 x 2390) = 842 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] D
= [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi
OR
ASP = FPP - (0.1 x D)
= 3324 - (0.1 x 7345') = 2590 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3288 - (0.1 x 7310') = 2576 psi
ORIGINAL
.
.
9 5/8" Surface Casinl! run to 3309' MD 12390' TVD.
Cement from 3309' MD to 2809' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2807' to surface with
Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost
(1795' MD).
Lead slurry:
System:
Tail slurry:
System:
(2809'-1795') X 0.3132 fe/ft X 1.5 (50% excess) = 476.4 fe below permafrost
1795' X 0.3132 fe/ft X 4 (300% excess) = 2248.8 fe above permafrost
Total volume = 476.4 + 2248.8 = 2725.2 fe => 613 Sx @ 4.45 fe/sk
613 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 fe/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9%
BWOW1 D044 freeze suppressant
500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 fe annular volume
80' X 0.4341 fe 1ft = 34.7 fe shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % S002 accelerator @ 15.8
PPG yielding 1.17 ft3/sk
Pilot Hole Cementinl! Reauirements
Cement Plug #1: 13515' MD to 12515' MD = 1000'.
Cement with Class G + additives @ 15.8 ppg. Assume 15 % excess on open hole volume.
Slurry: 1000' X 0.3941 fe/ft X 1.15 (15% excess) = 353.2 ft3 => 395 Sx @ 1.15 ft3/sk
Cement Plug #2 : 12515' MD to 11915' MD = 600'.
Cement with Class G + additives @ 17 ppg. Assume 15 % excess on open hole volume.
Slurry: 600' X 0.3941 fe/ftX 1.15 (15% excess) = 271.9 fe => 237 Sx @ 1.00 fe/sk
7" Intermediate Casinl! run to 13737 MD 17345' TVD
Lead cement from 12867' MD to +1- 9838' MD (minimum 500' MD above top of Albian 96 Formation) with 11
PPG LiteCrete. Assume 30% excess annular volume.
Tail cement from 13737' MD to +1- 12867' MD (minimum 500' MD above top of Alpine C Formation) with
Class G + adds @ 15.8 PPG. Assume 40% excess annular volume.
Lead:
System:
Tail:
System:
(12867'-9838') X 0.1268 ft3/ft X 1.3 (30% excess) = 499.3 fe annular vol
Total volume = 499.3 ft3 = 149 Sx @ 3.35 fe/sk
149 Sx 11 ppg LiteCrete 0.4% D046 antifoamer, 1 % D065 dispersant, 0.01 % B155 retarder and
0.25% D167 fluid loss additive @ 11 PPG yielding 3.35 fe/sk
(13737' - 12867') X 0.1268 fe/ft X 1.4 (40% excess) = 154.4 fe annular vol.
80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume
Total volume = 154.4 + 17.2 = 171.6 fe => ISO Sx @ 1.16 ft3/sk
150 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant, 0.07% B155 retarder and 0.4%
DI67 fluid loss additive @ 15.8 PPG yielding 1.15 fe/sk
1 By Weight Of mix Water, all other additiveor~i0r1':rÄ L
.
.
Conoc;pí,illips
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-31
Plan: CD2-31 (ST Pilot)
Plan: CD2-31 ST (wp03)
Standard Planning Report
13 May, 2004
spar"r"y-sun
DAIL-LING SERViCeS
A HALUBURTON COMPANY
ORIGINAL
~Þ'
ConocoPhilUps
Engineering
Alpine
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cylinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
-750
o
ê
=ê
o
o
LO
:s.
..c:
15.
<D
o
ëiJ
Q
12
<D
>
<D
::::¡
....
I-
Co
illi
Engineering
Calculation Method:
Error System:
Scan Method:
Error Surface:
Warning Method:
Alpine
Minimum Curvature
ISCWSA
Elliptical Conic
Rules Based
Trav. Cylinder North
"2
~
-6000 -5000
o
o
o
~
"'+
::c
t
o
Z
--
"7' -1000
::c
"5
o
(j)
West(-)/East(+) (2000 ftlìn)
55
}~ HALUnt:'fff(tt" (-()MP,,,,,'~,i',\
.
.
C<>nocJ'Phillips
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
SPERRY SUN HES
Planning Report
spar"'r"'y-sun
DRILL.ING SERVices
A HALUBURTON COMPANY
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine C02
Plan: CD2-31
Plan: CD2-31 (ST Pilot)
CD2-31 ST (wp03)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
Project
Map System:
Geo Datum:
Map Zone:
Colville River Unit, North Slope Alaska, United States
US State Plane 1927 (Exact solution)
NAD 1927 (NADCON CONUS)
Alaska Zone 04
System Datum:
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site
Alpine C02
Site Position:
From: Map
Position Uncertainty:
0.000 ft
Northing:
Easting:
Slot Radius:
5974641.660usft
371696.240 usft
O.OOOin
Latitude:
Longitude:
Grid Convergence:
70° 20' 020" N
151° 02' 028" W
-0.98 °
Well
Plan: CD2-31
---'^'---'-~-
.~-----~~--
0.000 ft
0.000 ft
0.000 ft
70° 20' 018" N
151° 02' 027" W
0.000 ft
Well Position +N/-S
+EI-W
Position Uncertainty
5974482.770 usfl
371713.040 usfl
ft
Latitude:
Longitude:
Ground Level:
Northing:
Easting:
Wellhead Elevation:
Well bore
'-------_.^---~._----~-.._---------^---_.,'-~----
Plan: CD2-31 (ST Pilot)
Magnetics
------~-
Model Name
Field Strength
(nT)
Sample Date
Declination
(0)
Dip Angle
(0)
bggm2003
57424
8/15/2002
24.75
80.59
-------_._._--_.._._-----~_.,_._-~--
CD2-31 ST (wp03)
Design
Audit Notes:
Version:
Vertical Section:
---~-~~
_._----,_.~-~~
2 Phase: PLAN Tie On Depth: 36.100
Depth From (TVD) +N/·S +EI-W Direction
(ft) (ft) (ft) (0)
36.100 0.000 0.000 331.860
.--'.----.,---....--------.---.-
Plan Sections
Measured Vertical Dogleg Build Turn
Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO
(ft) (0) (0) (ft) (ft) (ft) (0/10Dft) (0/100ft) (°/1 DOft) (0) Target
36.100 0.000 0.000 36.100 0.000 0.000 0.00 0.00 0.00 0.00
400.000 0.000 0.000 400.000 0.000 0.000 0.00 0.00 0.00 0.00
700.000 9.000 270.000 698.768 0.000 -23.514 3.00 3.00 0.00 270.00
1965.580 59.617 267.984 1710.508 -20.559 -713.534 4.00 4.00 -0.16 357.75
12159.710 59.617 267.984 6866.473 -329.923 -9502.198 0.00 0.00 0.00 0.00
13064.310 59.617 267.984 7324.000 -357.375 -10282.081 0.00 0.00 0.00 0.00
13515.101 59.617 267.984 7552.000 -371.055 -10670.721 0.00 0.00 0.00 0.00
---~._-- ._---~,-~--
5/13/200412:18:17PM
Page 2 of 7
COMPASS 2003.5
ORIGINAL
y
ConocoPhillips
.
.
SPERRY_SUN HES
Planning Report
spel"""l"""y-sun
DRILLING seRVices
A HALUBURTON COMPANY
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine C02
Plan: CD2-31
Plan: CD2-31 (ST Pilot)
CD2-31 ST (wp03)
Local Co-ordinate Reference:
TVD Reference:
MDReference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
Planned Survey
Measured Vertical Vertical Dogleg Build
Depth Inclination Azimuth Depth +N/-S +E/-W Section Ràte Rate
(ft) (0) (0) (ft) (ft) (ft) (ft) (o/100ft) (0/100ft)
36.100 0.000 0.000 36.100 0.000 0.000 0.000 0.00 0.00 0.00
SHL (1875'FNL & 1526'FEL; Sec2-T11N-R4E)
100.000 0.000 0.000 100.000 0.000 0.000 0.000 0.00 0.00 0.00
200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00
300.000 0.000 0.000 300.000 0.000 0.000 0.000 0.00 0.00 0.00
400.000 0.000 0.000 400.000 0.000 0.000 0.000 0.00 0.00 0.00
Begin Dir @ 3.00; 400.010'MD,400.010'TVD
500.000 3.000 270.000 499.954 0.000 -2.617 1.234 3.00 3.00 0.00
600.000 6.000 270.000 599.635 0.000 -10.462 4.934 3.00 3.00 0.00
700.000 9.000 270.000 698.768 0.000 -23.514 11.090 3.00 3.00 0.00
Continue Dir @ 4.00: 700.001'MD, 698.769' TVD
800.000 12.998 269.302 796.911 -0.137 -42.588 19.965 4.00 4.00 -0.70
900.000 16.997 268.929 893.485 -0.547 -68.457 31.803 4.00 4.00 -0.37
1000.000 20.996 268.695 988.020 -1.229 -100.994 46.548 4.00 4.00 -0.23
1100.000 24.995 268.532 1080.055 -2.178 -140.040 64.126 4.00 4.00 -0.16
1200.000 28.995 268.413 1169.141 -3.391 -185.407 84.452 4.00 4.00 -0.12
1300.000 32.995 268.320 1254.845 -4.862 -236.871 107.428 4.00 4.00 -0.09
1400.000 36.995 268.245 1336.749 -6.582 -294.184 132.941 4.00 4.00 -0.07
1500.000 40.994 268.183 1414.454 -8.545 -357.065 160.867 4.00 4.00 -0.06
1600.000 44.994 268.130 1487.581 -10.740 -425.209 191.070 4.00 4.00 -0.05
1700.000 48.994 268.084 1555.774 -13.157 -498.282 223.402 4.00 4.00 -0.05
1800.000 52.994 268.043 1618.702 -15.783 -575.930 257.707 4.00 4.00 -0.04
1900.000 56.994 268.006 1676.056 -18.607 -657.774 293.817 4.00 4.00 -0.04
1965.580 59.617 267.984 1710.508 -20.559 -713.534 318.394 4.00 4.00 -0.03
End Dir, Start Sail @ 59.617; 1965.580' MD, 1710.508' TVD
2000.000 59.617 267.984 1727.917 -21.603 -743.209 331 .468 0.00 0.00 0.00
2100.000 59.617 267.984 1778.495 -24.638 -829.422 369.453 0.00 0.00 0.00
2200.000 59.617 267.984 1829.073 -27.673 -915.635 407.437 0.00 0.00 0.00
2300.000 59.617 267.984 1879.651 -30.707 -1001.848 445.421 0.00 0.00 0.00
2400.000 59.617 267.984 1930.228 -33.742 -1088.061 483.406 0.00 0.00 0.00
2500.000 59.617 267.984 1980.806 -36.777 -1174.274 521.390 0.00 0.00 0.00
2600.000 59.617 267.984 2031.384 -39.812 -1260.487 559.375 0.00 0.00 0.00
2700.000 59.617 267.984 2081.962 -42.846 -1346.700 597.359 0.00 0.00 0.00
2800.000 59.617 267.984 2132.539 -45.881 -1432.913 635.343 0.00 0.00 0.00
2900.000 59.617 267.984 2183.117 -48.916 -1519.126 673.328 0.00 0.00 0.00
3000.000 59.617 267.984 2233.695 -51.950 -1605.339 711.312 0.00 0.00 0.00
3063.872 59.617 267.984 2266.000 -53.889 -1660.405 735.574 0.00 0.00 0.00
C-40
3100.000 59.617 267.984 2284.273 -54.985 -1691.552 749.297 0.00 0.00 0.00
3200.000 59.617 267.984 2334.851 -58.020 -1777.765 787.281 0.00 0.00 0.00
3300.000 59.617 267.984 2385.428 -61.055 -1863.978 825.266 0.00 0.00 0.00
3309.048 59.617 267.984 2390.005 -61.329 -1871.778 828.702 0.00 0.00 0.00
95/8"
3400.000 59.617 267.984 2436.006 -64.089 -1950.191 863.250 0.00 0.00 0.00
3465.234 59.617 267.984 2469.000 -66.069 -2006.431 888.029 0.00 0.00 0.00
C-30
3500.000 59.617 267.984 2486.584 -67.124 -2036.404 901.234 0.00 0.00 0.00
3600.000 59.617 267.984 2537.162 -70.159 -2122.617 939.219 0.00 0.00 0.00
3700.000 59.617 267.984 2587.740 -73.194 -2208.830 977.203 0.00 0.00 0.00
3800.000 59.617 267.984 2638.317 -76.228 -2295.043 1015.188 0.00 0.00 0.00
3900.000 59.617 267.984 2688.895 -79.263 -2381.256 1053.172 0.00 0.00 0.00
4000.000 59.617 267.984 2739.473 -82.298 -2467.469 1091.156 0.00 0.00 0.00
5/13/200412:18:17PM Page 3 of 7 COMPASS 2003.5
ORIGINAL
. .
¥ SPERRY SUN HES spe,..,,..,v-sun
ConocoPhillips Planning Report
DRIL..L..ING seRVices
A HAlLIBURTON COMPANY
Database: EDM 2003.5 Single User Db Local Co-ordinate Reference: Well Plan: CD2-31
Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52 @ 52.000ft (52)
PrOject: Colville River Unit MD Reference: 52 @ 52.000ft (52)
Site: Alpine CD2 North Reference: True
Well: Plan: CD2-31 Survey Calculation Method: Minimum Curvature
Wellbore: Plan: CD2-31 (ST Pilot)
De$ign: CD2-31 ST (wp03)
4100.000 59.617 267.984 2790.051 -----=85.3"32- -2553.682 1129.141 0.00 0.00 0.00
4186.895 59.617 267.984 2834.000 -87.969 -2628.596 1162.147 0.00 0.00 0.00
C-20
4200.000 59.617 267.984 2840.628 -88.367 -2639.895 1167.125 0.00 0.00 0.00
4300.000 59.617 267.984 2891.206 -91.402 -2726.108 1205.110 0.00 0.00 0.00
4400.000 59.617 267.984 2941.784 -94.437 -2812.321 1243.094 0.00 0.00 0.00
4500.000 59.617 267.984 2992.362 -97.471 -2898.534 1281.078 0.00 0.00 0.00
4600.000 59.617 267.984 3042.940 -100.506 -2984.747 1319.063 0.00 0.00 0.00
4700.000 59.617 267.984 3093.517 -103.541 -3070.959 1357.047 0.00 0.00 0.00
4800.000 59.617 267.984 3144.095 -106.576 -3157.172 1395.032 0.00 0.00 0.00
4900.000 59.617 267.984 3194.673 -109.610 -3243.385 1433.016 0.00 0.00 0.00
5000.000 59.617 267.984 3245.251 -112.645 -3329.598 1471.000 0.00 0.00 0.00
5100.000 59.617 267.984 3295.828 -115.680 -3415.811 1508.985 0.00 0.00 0.00
5200.000 59.617 267.984 3346.406 -118.714 -3502.024 1546.969 0.00 0.00 0.00
5300.000 59.617 267.984 3396.984 -121.749 -3588.237 1584.954 0.00 0.00 0.00
5400.000 59.617 267.984 3447.562 -124.784 -3674.450 1622.938 0.00 0.00 0.00
5500.000 59.617 267.984 3498.140 -127.819 -3760.663 1660.922 0.00 0.00 0.00
5600.000 59.617 267.984 3548.717 -130.853 -3846.876 1698.907 0.00 0.00 0.00
5700.000 59.617 267.984 3599.295 -133.888 -3933.089 1736.891 0.00 0.00 0.00
5800.000 59.617 267.984 3649.873 -136.923 -4019.302 1774.876 0.00 0.00 0.00
5900.000 59.617 267.984 3700.451 -139.958 -4105.515 1812.860 0.00 0.00 0.00
6000.000 59.617 267.984 3751.029 -142.992 -4191.728 1850.844 0.00 0.00 0.00
6100.000 59.617 267.984 3801.606 -146.027 -4277.941 1888.829 0.00 0.00 0.00
6200.000 59.617 267.984 3852.184 -149.062 -4364.154 1926.813 0.00 0.00 0.00
6286.631 59.617 267.984 3896.000 -151.691 -4438.841 1959.720 0.00 0.00 0.00
K-3 MARKER
6300.000 59.617 267.984 3902.762 -152.096 -4450.367 1964.798 0.00 0.00 0.00
6400.000 59.617 267.984 3953.340 -155.131 -4536.580 2002.782 0.00 0.00 0.00
6500.000 59.617 267.984 4003.917 -158.166 -4622.793 2040.767 0.00 0.00 0.00
6600.000 59.617 267.984 4054.495 -161.201 -4709.006 2078.751 0.00 0.00 0.00
6666.244 59.617 267.984 4088.000 -163.211 -4766.117 2103.913 0.00 0.00 0.00
BASAL K-3 SS
6700.000 59.617 267.984 4105.073 -164.235 -4795.219 2116.735 0.00 0.00 0.00
6721.605 59.617 267.984 4116.000 -164.891 -4813.845 2124.942 0.00 0.00 0.00
K-2 MARKER
6800.000 59.617 267.984 4155.651 -167.270 -4881 .432 2154.720 0.00 0.00 0.00
6891.640 59.617 267.984 4202.000 -170.051 -4960.437 2189.529 0.00 0.00 0.00
BASE K-2 SEQUENCE
6900.000 59.617 267.984 4206.229 -170.305 -4967.645 2192.704 0.00 0.00 0.00
7000.000 59.617 267.984 4256.806 -173.340 -5053.858 2230.689 0.00 0.00 0.00
7100.000 59.617 267.984 4307.384 -176.374 -5140.071 2268.673 0.00 0.00 0.00
7200.000 59.617 267.984 4357.962 -179.409 -5226.284 2306.657 0.00 0.00 0.00
7300.000 59.617 267.984 4408.540 -182.444 -5312.497 2344.642 0.00 0.00 0.00
7400.000 59.617 267.984 4459.117 -185.478 -5398.710 2382.626 0.00 0.00 0.00
7500.000 59.617 267.984 4509.695 -188.513 -5484.923 2420.611 0.00 0.00 0.00
7600.000 59.617 267.984 4560.273 -191.548 -5571.136 2458.595 0.00 0.00 0.00
7700.000 59.617 267.984 4610.851 -194.583 -5657.349 2496.579 0.00 0.00 0.00
7800.000 59.617 267.984 4661.429 -197.617 -5743.562 2534.564 0.00 0.00 0.00
7900.000 59.617 267.984 4712.006 -200.652 -5829.775 2572.548 0.00 0.00 0.00
8000.000 59.617 267.984 4762.584 -203.687 -5915.988 2610.533 0.00 0.00 0.00
8100.000 59.617 267.984 4813.162 -206.722 -6002.201 2648.517 0.00 0.00 0.00
8200.000 59.617 267.984 4863.740 -209.756 -6088.414 2686.501 0.00 0.00 0.00
8300.000 59.617 267.984 4914.318 -212.791 -6174.627 2724.486 0.00 0.00 0.00
8400.000 59.617 267.984 4964.895 -215.826 -6260.840 2762.470 0.00 0.00 0.00
8500.000 59.617 267.984 5015.473 -218.861 -6347.053 2800.455 0.00 0.00 0.00
8600.000 59.617 267.984 5066.051 -221.895 -6433.266 2838.439 0.00 0.00 0.00
8700.000 59.617 267.984 5116.629 -224.930 -6519.479 2876.423 0.00 0.00 0.00
8800.000 59.617 267.984 5167.206 . ~27 .965 __ -6605.692 2914.40-ª----- 0.00 0.00 0.00
5/13/200412:18:17PM Page 4 of 7 COMPASS 2003.5
ORIGINAL
y . SPERRY SUN HES . spel""'l""'y-sun
ConocoPhillips Planning Report DRILL.ING SERVICES
A HALLIBURTON COMPANY
Database: EDM 2003.5 Single User Db Local Co-ordinate Reference: Well Plan: CD2-31
Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52 @ 52.000ft (52)
Project: Colville River Unit MD Reference: 52 @ 52.000ft (52)
Site: Alpine CO2 North Reference: True
Well: Plan: CD2-31 Survey Calculation Method: Minimum Curvature
Wellbore: Plan: CD2-31 (ST Pilot)
Design: CD2-31 ST (wp03)
8900.000 59.617 267.984 5217.784 -230.999 -6691.905 2952~392 0.00 0.00 0.00
. 9000.000 59.617 267.984 5268.362 -234.034 -6778.118 2990.377 0.00 0.00 0.00
9034.873 59.617 267.984 5286.000 -235.092 -6808.183 3003.623 0.00 0.00 0.00
ALBIAN 97
9100.000 59.617 267.984 5318.940 -237.069 -6864.331 3028.361 0.00 0.00 0.00
9200.000 59.617 267.984 5369.518 -240.104 -6950.544 3066.345 0.00 0.00 0.00
9300.000 59.617 267.984 5420.095 -243.138 -7036.757 3104.330 0.00 0.00 0.00
9400.000 59.617 267.984 5470.673 -246.173 -7122.970 3142.314 0.00 0.00 0.00
9500.000 59.617 267.984 5521.251 -249.208 -7209.183 3180.299 0.00 0.00 0.00
9600.000 59.617 267.984 5571.829 -252.243 -7295.396 3218.283 0.00 0.00 0.00
9700.000 59.617 267.984 5622.406 -255.277 -7381.609 3256.267 0.00 0.00 0.00
9800.000 59.617 267.984 5672.984 -258.312 -7467.822 3294.252 0.00 0.00 0.00
9900.000 59.617 267.984 5723.562 -261.347 -7554.035 3332.236 0.00 0.00 0.00
10000.000 59.617 267.984 5774.140 -264.381 -7640.248 3370.221 0.00 0.00 0.00
10100.000 59.617 267.984 5824.718 -267.416 -7726.461 3408.205 0.00 0.00 0.00
10200.000 59.617 267.984 5875.295 -270.451 -7812.674 3446.190 0.00 0.00 0.00
10300.000 59.617 267.984 5925.873 -273.486 -7898.887 3484.174 0.00 0.00 0.00
10345.725 59.617 267.984 5949.000 -274.873 -7938.308 3501.542 0.00 0.00 0.00
ALBIAN 96
10400.000 59.617 267.984 5976.451 -276.520 -7985.099 3522.158 0.00 0.00 0.00
10500.000 59.617 267.984 6027.029 -279.555 -8071.312 3560.143 0.00 0.00 0.00
10600.000 59.617 267.984 6077.607 -282.590 -8157.525 3598.127 0.00 0.00 0.00
10700.000 59.617 267.984 6128.184 -285.625 -8243.738 3636.112 0.00 0.00 0.00
10800.000 59.617 267.984 6178.762 -288.659 -8329.951 3674.096 0.00 0.00 0.00
10900.000 59.617 267.984 6229.340 -291.694 -8416.164 3712.080 0.00 0.00 0.00
, 11000.000 59.617 267.984 6279.918 -294.729 -8502.377 3750.065 0.00 0.00 0.00
11100.000 59.617 267.984 6330.495 -297.763 -8588.590 3788.049 0.00 0.00 0.00
11200.000 59.617 267.984 6381.073 -300.798 -8674.803 3826.034 0.00 0.00 0.00
11300.000 59.617 267.984 6431.651 -303.833 -8761.016 3864.018 0.00 0.00 0.00
11400.000 59.617 267.984 6482.229 -306.868 -884 7 .229 3902.002 0.00 0.00 0.00
11500.000 59.617 267.984 6532.807 -309.902 -8933.442 3939.987 0.00 0.00 0.00
11600.000 59.617 267.984 6583.384 -312.937 -9019.655 3977.971 0.00 0.00 0.00
11700.000 59.617 267.984 6633.962 -315.972 -9105.868 4015.956 0.00 0.00 0.00
11800.000 59.617 267.984 6684.540 -319.007 -9192.081 4053.940 0.00 0.00 0.00
11900.000 59.617 267.984 6735.118 -322.041 -9278.294 4091.924 0.00 0.00 0.00
12000.000 59.617 267.984 6785.695 -325.076 -9364.507 4129.909 0.00 0.00 0.00
12100.000 59.617 267.984 6836.273 -328.111 -9450.720 4167.893 0.00 0.00 0.00
12159.710 59.617 267.984 6866.473 -329.923 -9502.198 4190.574 0.00 0.00 0.00
Begin Dir Sidetrack point for Horizontal Section of Hole
12200.000 59.617 267.984 6886.851 -331.145 -9536.933 4205.878 0.00 0.00 0.00
12291.244 59.617 267.984 6933.000 -333.914 -9615.597 4240.536 0.00 0.00 0.00
TOP HRZ
12300.000 59.617 267.984 6937.429 -334.180 -9623.146 4243.862 0.00 0.00 0.00
12400.000 59.617 267.984 6988.007 -337.215 -9709.359 4281.846 0.00 0.00 0.00
12500.000 59.617 267.984 7038.584 -340.250 -9795.572 4319.831 0.00 0.00 0.00
12600.000 59.617 267.984 7089.162 -343.284 -9881.785 4357.815 0.00 0.00 0.00
12605.611 59.617 267.984 7092.000 -343.455 -9886.622 4359.947 0.00 0.00 0.00
BASE HRZ
12694.583 59.617 267.984 7137.000 -346.155 -9963.328 4393.742 0.00 0.00 0.00
K-1 MARKER
12700.000 59.617 267.984 7139.740 -346.319 -9967.998 4395.800 0.00 0.00 0.00
12777.623 59.617 267.984 7179.000 -348.675 -10034.919 4425.284 0.00 0.00 0.00
TOP KUPARUK
- 12800.000 59.617 267.984 7190.318 -349.354 -10054.211 4433.784 0.00 0.00 0.00
12870.549 59.617 267.984 7226.000 -351.495 -10115.034 4460.582 0.00 0.00 0.00
LCU
12900.000 59.617 267.984 7240.896 -352.389 -10140.424 4471.768 0.00 0.00 0.00
12971.384 59.617 267.984 7277.000 -~54.555 -10201.967 4498.883 0.00 0.00 0.00
5/13/200412:18:17PM Page 5 of 7 COMPASS 2003.5
ORIGINAL
.
.
. ~·II·
Conocur.JI. IPS
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Plan: Plan: CD2-31 (wp05)
Standard Planning Report
10 May, 2004
spe,-,,-,v-sun
DRILLING SERViCeS
A HALLIBURTON COMPANY
ORIGINAL
IlIips
Engineering
Alpine
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cylinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
¡Iii
Engineering
Calculation Method:
Error System:
Scan Method:
Error Surface:
Warning Method:
Alpine
Minimum Curvature
ISCWSA
Elliptical Conic
Rules Based
Trav. Cylinder North
ê
~
o
o
o
~
+-
'1:
1:::
o
Z
::;:-
'1:
'5
o
(f)
West(-)/East(+) (2000 ftlin)
A UAI,UnÆllrr-o:s t::o,\W,\;,\,\'
.
ConocÓÁ,illips
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
SPERRY_SUN HES
Planning Report
.
sper"r"y-sun
DRILLING SERVICES
A HALLIBURTON COMPANY
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
Project
Map System:
Geo Datum:
Map Zone:
Colville River Unit, North Slope Alaska, United States
US State Plane 1927 (Exact solution)
NAD 1927 (NADCON CONUS)
Alaska Zone 04
System Datum:
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
Site
Alpine CD2
Site Position:
From: Map
Position Uncertainty:
0.000 ft
Northing:
Easting:
Slot Radius:
5974641.660usft
371696.240 usft
O.OOOin
Latitude:
Longitude:
Grid Convergence:
700 20' 020" N
151002' 028" W
-0.98 0
Wen Plan: CD2-31
Well Position +N/-5
+E!-W
Position Uncertainty
0.000 ft
0.000 ft
0.000 ft
Northing:
Easting:
Wellhead Elevation:
Latitude:
Longitude:
Ground Level:
Well bore
PLAN: CD2-31
Magnetics
Model Name
Sample Date
5974482.770 usfl
371713.040 usfl
ft
70020' 018" N
151002' 027" W
0.000 ft
bggm2003
Declination
(")
Dip Angle
(0)
8/12/2002
80.59
57424
------'""--
24.75
Design
Audit Notes:
Version:
Vertical Section:
Plan: CD2-31 (wp05)
12
Phase:
PLAN
36.100
Depth From (TVD)
(ft)
36.100
Tie On Depth:
+E!-W
(ft)
0.000
Direction
(0)
289.968
+N/-5
(ft)
0.000
-~
Plal1 Sections
Measured Vertical Dogleg Build Turn
Depth Inclination Azimuth Depth +N/-5 +E!-W Rate Râte Rate
(ft) (0) (0) (ft) (ft) (ft) (0/100ft) (0/100ft) (o/~OOft)
36.100 0.000 0.000 36.100 0.000 0.000 0.00 0.00 0.00 0.00
400.001 0.000 0.000 400.001 0.000 0.000 0.00 0.00 0.00 0.00
700.001 9.000 270.000 698.769 0.000 -23.514 3.00 3.00 0.00 270.00
1965.592 59.617 267.985 1710.515 -20.549 -713.544 4.00 4.00 -0.16 -2.25
12159.776 59.617 267.985 6866.438 -329.767 -9502.300 0.00 0.00 0.00 0.00
13857.885 90.439 331.870 7347.000 491.772 -10788.931 4.00 1.82 3.76 75.68 CD2-31 (Heel)
18681.879 90.439 331.870 7310.000 4745.842 -13063.229 0.00 0.00 0.00 0.00 CD2-31 (New Toe)
5/10/2004 10:28:44AM
Page 2 of 8
COMPASS 2003.5
ORIG\NAL
y
ConocoPhillips
e
SPERRY_SUN HES
Planning Report
.
spe...,...,v-sun
DAIL.L.ING seFlVlces
/4. HAWBURTON COMPANY
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine C02
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
Planned Survey
M"asured Vertical Vertic~tI [)ogleg
Depth Inclination Azimuth Depth +N/..s +E/..W Section Rate
(ft) (") (") (ft) (ft) (ft) (ft) ("Ii OOft)
36.100 0.000 0.000 36.100 0.000 0.000 0.000 0.00 0.00 0.00
SHL=1875'FNL&1526'FEL; Sec2-T11 N-R4E
100.000 0.000 0.000 100.000 0.000 0.000 0.000 0.00 0.00 0.00
200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00
300.000 0.000 0.000 300.000 0.000 0.000 0.000 0.00 0.00 0.00
400.001 0.000 0.000 400.001 0.000 0.000 0.000 0.00 0.00 0.00
Begin Dir@ 3.00; 400.010'MD,400.010'TVD .'
500.000 3.000 270.000 499.954 0.000 -2.617 2.460 3.00 3.00 0.00
600.000 6.000 270.000 599.635 0.000 -10.462 9.833 3.00 3.00 0.00
700.001 9.000 270.000 698.769 0.000 -23.514 22.100 3.00 3.00 0.00
Continue Dir @ 4.00: 700.010'MD, 698.778' TVD
800.000 12.998 269.303 796.911 -0.137 -42.588 39.981 4.00 4.00 -0.70
900.000 16.997 268.930 893.485 -0.547 -68.456 64.154 4.00 4.00 -0.37
1000.000 20.996 268.695 988.020 -1.228 -100.993 94.503 4.00 4.00 -0.23
1100.000 24.995 268.533 1080.055 -2.177 -140.040 130.878 4.00 4.00 -0.16
1200.000 28.995 268.413 1169.141 -3.390 -185.406 173.103 4.00 4.00 -0.12
1300.000 32.995 268.320 1254.845 -4.859 -236.871 220.972 4.00 4.00 -0.09
1400.000 36.995 268.246 1336.749 -6.579 -294.184 274.252 4.00 4.00 -0.07
1500.000 40.994 268.183 1414.454 -8.541 -357.065 332.684 4.00 4.00 -0.06
1600.000 44.994 268.131 1487.581 -10.735 -425.208 395.981 4.00 4.00 -0.05
1700.000 48.994 268.085 1555.775 -13.150 -498.282 463.837 4.00 4.00 -0.05
1800.000 52.994 268.044 1618.702 -15.775 -575.930 535.921 4.00 4.00 -0.04
1900.000 56.994 268.007 1676.057 -18.598 -657.773 611.881 4.00 4.00 -0.04
1965.592 59.617 267.985 1710.515 -20.549 -713.544 663.633 4.00 4.00 -0.03
End Dir, Start Sail @59.617; 1965.600' MD, 1710.519' TVD
2000.000 59.617 267.985 1727.917 -21.593 -743.209 691.158 0.00 0.00 0.00
2100.000 59.617 267.985 1778.495 -24.626 -829.422 771.153 0.00 0.00 0.00
2200.000 59.617 267.985 1829.072 -27.659 -915.635 851.148 0.00 0.00 0.00
2300.000 59.617 267.985 1879.649 -30.693 -1001.849 931.143 0.00 0.00 0.00
2400.000 59.617 267.985 1930.226 -33.726 -1088.062 1011.138 0.00 0.00 0.00
2500.000 59.617 267.985 1980.803 -36.759 -1174.276 1091.133 0.00 0.00 0.00
2600.000 59.617 267.985 2031.380 -39.792 -1260.489 1171.128 0.00 0.00 0.00
2700.000 59.617 267.985 2081.957 -42.826 -1346.703 1251.123 0.00 0.00 0.00
2800.000 59.617 267.985 2132.534 -45.859 -1432.916 1331.117 0.00 0.00 0.00
2900.000 59.617 267.985 2183.111 -48.892 -1519.129 1411.112 0.00 0.00 0.00
3000.000 59.617 267.985 2233.689 -51.926 -1605.343 1491.107 0.00 0.00 0.00
3063.886 59.617 267.985 2266.000 -53.863 -1660.421 1542.213 0.00 0.00 0.00
C-40
3100.000 59.617 267.985 2284.266 -54.959 -1691.556 1571.102 0.00 0.00 0.00
3200.000 59.617 267.985 2334.843 -57.992 -1777.770 1651.097 0.00 0.00 0.00
3300.000 59.617 267.985 2385.420 -61.025 -1863.983 1731.092 0.00 0.00 0.00
3309.056 59.617 267.985 2390.000 -61.300 -1871.790 1738.337 0.00 0.00 0.00
9-5/8" Csg Pt...Drill out 8·1/2" Hole: 3314'MD, 2390.000'TVD - 95/8" @ 3309' MD
3400.000 59.617 267.985 2435.997 -64.059 -1950.197 1811.087 0.00 0.00 0.00
3465.253 59.617 267.985 2469.000 -66.038 -2006.454 1863.287 0.00 0.00 0.00
C-30
3500.000 59.617 267.985 2486.574 -67.092 -2036.410 1891.082 0.00 0.00 0.00
3600.000 59.617 267.985 2537.151 -70.125 -2122.623 1971.077 0.00 0.00 0.00
3700.000 59.617 267.985 2587.728 -73.159 -2208.837 2051.072 0.00 0.00 0.00
3800.000 59.617 267.985 2638.305 -76.192 -2295.050 2131.067 0.00 0.00 0.00
3900.000 59.617 267.985 2688.882 -79.225 -2381.264 2211.062 0.00 0.00 0.00
4000.000 59.617 267.985 2739.460 -82.258 -2467.477 2291.057 0.00 0.00 0.00
5/10/200410:28:44AM Page 3 of 8 COMPASS 2003.5
ORIGINAL
~
ConocoPhillips
.
SPERRY_SUN HES
Planning Report
.
5pe~~Y-5un
DRIL.L.ING seRVices
A HALUBURTON COMPANY
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
4100.000 59.617 267.985 2790.037 -85.292 -2553.691 2371.052 0.00 0.00 0.00
4186.924 59.617 267.985 2834.000 -87.928 -2628.630 2440.587 0.00 0.00 0.00
C-20
4200.000 59.617 267.985 2840.614 -88.325 -2639.904 2451.047 0.00 0.00 0.00
4300.000 59.617 267.985 2891.191 -91.358 -2726.117 2531.042 0.00 0.00 0.00
4400.000 59.617 267.985 2941.768 -94.391 -2812.331 2611.037 0.00 0.00 0.00
4500.000 59.617 267.985 2992.345 -97.425 -2898.544 2691.032 0.00 0.00 0.00
4600.000 59.617 267.985 3042.922 -100.458 -2984.758 2771.027 0.00 0.00 0.00
4700.000 59.617 267.985 3093.499 -103.491 -3070.971 2851.022 0.00 0.00 0.00
4800.000 59.617 267.985 3144.076 -106.525 -3157.185 2931.017 0.00 0.00 0.00
4900.000 59.617 267.985 3194.654 -109.558 -3243.398 3011.012 0.00 0.00 0.00
5000.000 59.617 267.985 3245.231 -112.591 -3329.611 3091.007 0.00 0.00 0.00
5100.000 59.617 267.985 3295.808 -115.624 -3415.825 3171.002 0.00 0.00 0.00
5200.000 59.617 267.985 3346.385 -118.658 -3502.038 3250.997 0.00 0.00 0.00
5300.000 59.617 267.985 3396.962 -121.691 -3588.252 3330.992 0.00 0,00 0.00
5400.000 59.617 267.985 3447.539 -124.724 -3674.465 3410.987 0.00 0.00 0.00
5500.000 59.617 267.985 3498.116 -127.758 -3760.679 3490.982 0.00 0.00 0.00
5600.000 59.617 267.985 3548.693 -130.791 -3846.892 3570.977 0.00 0.00 0.00
5700.000 59.617 267.985 3599.270 -133.824 -3933.105 3650.972 0.00 0.00 0.00
5800.000 59.617 267.985 3649.848 -136.857 -4019.319 3730.967 0.00 0.00 0.00
5900.000 59.617 267.985 3700.425 -139.891 -4105.532 3810.962 0.00 0.00 0.00
. 6000.000 59.617 267.985 3751.002 -142.924 -4191.746 3890.957 0.00 0.00 0.00
6100.000 59.617 267.985 3801.579 -145.957 -4277.959 3970.952 0.00 0.00 0.00
6200.000 59.617 267.985 3852.156 -148.991 -4364.173 4050.947 0.00 0.00 0.00
6286.688 59.617 267.985 3896.000 -151.620 -4438.909 4120.292 0.00 0.00 0.00
K-3 MARKER
6300.000 59.617 267.985 3902.733 -152.024 -4450.386 4130.941 0.00 0.00 0.00
6400.000 59.617 267.985 3953.310 -155.057 -4536.599 4210.936 0.00 0.00 0.00
6500.000 59.617 267.985 4003.887 -158.090 -4622.813 4290.931 0.00 0.00 0.00
6600.000 59.617 267.985 4054.464 -161.124 -4709.026 4370.926 0.00 0.00 0.00
6666.306 59.617 267.985 4088.000 -163.135 -4766.191 4423.968 0.00 0.00 0.00
BASAL K-3 SS
6700.000 59.617 267.985 4105.041 -164.157 -4795.240 4450.921 0.00 0.00 0.00
6721.667 59.617 267.985 4116.000 -164.814 -4813.920 4468.254 0.00 0.00 0.00
K-2 MARKER
6800.000 59.617 267.985 4155.619 -167.190 -4881.453 4530.916 0.00 0.00 0.00
6891.705 59.617 267.985 4202.000 -169.972 -4960.515 4604.275 0.00 0.00 0.00
BASE K-2 SEQUENCE
6900.000 59.617 267.985 4206.196 -170.224 -4967.667 4610.911 0.00 0.00 0.00
" 7000.000 59.617 267.985 4256.773 -173.257 -5053.880 4690.906 0.00 0.00 0.00
7100.000 59.617 267.985 4307.350 -176.290 -5140.093 4770.901 0.00 0.00 0.00
7200.000 59.617 267.985 4357.927 -179.323 -5226.307 4850.896 0.00 0.00 0.00
7300.000 59.617 267.985 4408.504 -182.357 -5312.520 4930.891 0.00 0.00 0.00
7400.000 59.617 267.985 4459.081 -185.390 -5398.734 5010.886 0.00 0.00 0.00
7500.000 59.617 267.985 4509.658 -188.423 -5484.947 5090.881 0.00 0.00 0.00
7600.000 59.617 267.985 4560.235 -191.457 -5571.161 5170.876 0.00 0.00 0.00
7700.000 59.617 267.985 4610.813 -194.490 -5657.374 5250.871 0.00 0.00 0.00
7800.000 59.617 267.985 4661.390 -197.523 -5743.587 5330.866 0.00 0.00 0.00
7900.000 59.617 267.985 4711.967 -200.556 -5829.801 5410.861 0.00 0.00 0.00
- 8000.000 59.617 267.985 4762.544 -203.590 -5916.014 5490.856 0.00 0.00 0.00
8100.000 59.617 267.985 4813.121 -206.623 -6002.228 5570.851 0.00 0.00 0.00
8200.000 59.617 267.985 4863.698 -209.656 -6088.441 5650.846 0.00 0.00 0.00
8300.000 59.617 267.985 4914.275 -212.690 -6174.655 5730.841 0.00 0.00 0.00
8400.000 59.617 267.985 4964.852 -215.723 -6260.868 5810.836 0.00 0.00 0.00
8500.000 59.617 267.985 5015.429 -218.756 -6347.081 5890.831 0.00 0.00 0.00
8600.000 59.617 267.985 5066.007 -221.789 -6433.295 5970.826 0.00 0.00 0.00
8700.000 59.617 267.985 5116.584 -224.823 -6519.508 6050.821 0.00 0.00 0.00
8800.000 59.617 267.985 5167.161 -227.856 -6605.722 6130.816 0.00 0.00 0.00
5/10/200410:28:44AM
Page 4 of 8
COMPASS 2003.5
ORIGINAL
.
.
y
ConocoPhillips
Database:
Company:
Project:
Site:
Well:
Wel/bore:
Design:
SPERRY_SUN HES
Planning Report
spe...,...,v-sun
DRIL.L.ING seRVices
À HALLIBURTON COMPANY
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
8900.000 59.617 267.985 5217.738 -230.889 -6691.935 6210.811 0.00 0.00 0.00
9000.000 59.617 267.985 5268.315 -233.922 -6778.149 6290.806 0.00 0.00 0.00
9034.967 59.617 267.985 5286.000 -234.983 -6808.295 6318.777 0.00 0.00 0.00
ALBIAN 97
9100.000 59.617 267.985 5318.892 -236.956 -6864.362 6370.801 0.00 0.00 0.00
9200.000 59.617 267.985 5369.469 -239.989 -6950.575 6450.796 0.00 0.00 0.00
9300.000 59.617 267.985 5420.046 -243.022 -7036.789 6530.791 0.00 0.00 0.00
9400.000 59.617 267.985 5470.623 -246.056 -7123.002 6610.786 0.00 0.00 0.00
9500.000 59.617 267.985 5521.200 -249.089 -7209.216 6690.781 0.00 0.00 0.00
9600.000 59.617 267.985 5571.778 -252.122 -7295.429 6770.776 0.00 0.00 0.00
9700.000 59.617 267.985 5622.355 -255.155 -7381.643 6850.771 0.00 0.00 0.00
9800.000 59.617 267.985 5672.932 -258.189 -7467.856 6930.766 0.00 0.00 0.00
9900.000 59.617 267.985 5723.509 -261.222 -7554.069 7010.760 0.00 0.00 0.00
10000.000 59.617 267.985 5774.086 -264.255 -7640.283 7090.755 0.00 0.00 0.00
10100.000 59.617 267.985 5824.663 -267.289 -7726.496 7170.750 0.00 0.00 0.00
10200.000 59.617 267.985 5875.240 -270.322 -7812.710 7250.745 0.00 0.00 0.00
10300.000 59.617 267.985 5925.817 -273.355 -7898.923 7330.740 0.00 0.00 0.00
10337.928 59.617 267.985 5945.000 -274.506 -7931.622 7361.081 0.00 0.00 0.00
ALBIAN 96
10400.000 59.617 267.985 5976.394 -276.388 -7985.137 7410.735 0.00 0.00 0.00
10500.000 59.617 267.985 6026.972 -279.422 -8071.350 7490.730 0.00 0.00 0.00
10600.000 59.617 267.985 6077.549 -282.455 -8157.563 7570.725 0.00 0.00 0.00
10700.000 59.617 267.985 6128.126 -285.488 -8243.777 7650.720 0.00 0.00 0.00
10800.000 59.617 267.985 6178.703 -288.522 -8329.990 7730.715 0.00 0.00 0.00
10900.000 59.617 267.985 6229.280 -291.555 -8416.204 7810.710 0.00 0.00 0.00
11000.000 59.617 267.985 6279.857 -294.588 -8502.417 7890.705 0.00 0.00 0.00
11100.000 59.617 267.985 6330.434 -297.621 -8588.631 7970.700 0.00 0.00 0.00
11200.000 59.617 267.985 6381.011 -300.655 -8674.844 8050.695 0.00 0.00 0.00
11300.000 59.617 267.985 6431.588 -303.688 -8761.057 8130.690 0.00 0.00 0.00
11400.000 59.617 267.985 6482.166 -306.721 -8847.271 8210.685 0.00 0.00 0.00
11500.000 59.617 267.985 6532.743 -309.755 -8933.484 8290.680 0.00 0.00 0.00
11600.000 59.617 267.985 6583.320 -312.788 -9019.698 8370.675 0.00 0.00 0.00
11700.000 59.617 267.985 6633.897 -315.821 -9105.911 8450.670 0.00 0.00 0.00
11800.000 59.617 267.985 6684.474 -318.854 -9192.125 8530.665 0.00 0.00 0.00
11900.000 59.617 267.985 6735.051 -321.888 -9278.338 8610.660 0.00 0.00 0.00
12000.000 59.617 267.985 6785.628 -324.921 -9364.551 8690.655 0.00 0.00 0.00
12100.000 59.617 267.985 6836.205 -327.954 -9450.765 8770.650 0.00 0.00 0.00
'. 12159.776 59.617 267.985 6866.438 -329.767 -9502.300 8818.468 0.00 0.00 0.00
Begin Dir @ 4.00; 12159.780'MD,6866.440'TVD
12200.000 60.028 269.785 6886.659 -330.443 -9537.064 8850.911 4.00 1.02 4.47
12285.980 60.985 273.580 6929.000 -328.235 -9611.847 8921.953 4.00 1.11 4.41
TOP HRZ
12300.000 61.152 274.192 6935.783 -327.403 -9624.090 8933.744 4.00 1.19 4.36
12400.000 62.416 278.499 6983.079 -317.648 -9711.633 9019.356 4.00 1.26 4.31
12500.000 63.809 282.703 7028.318 -301 .226 -9799.267 9107.329 4.00 1.39 4.20
12600.000 65.322 286.804 7071.280 -278.216 -9886.564 9197.237 4.00 1.51 4.10
12640.543 65.967 288.437 7088.000 -267.034 -9921.764 9234.139 4.00 1.59 4.03
BASE HRZ
12700.000 66.944 290.803 7111.754 -248.730 -9973.099 9288.639 4.00 1.64 3.98
12755.313 67.883 292.972 7133.000 -229.690 -10020.483 9339.676 4.00 1.70 3.92
K·1 MARKER
12800.000 68.663 294.704 7149.543 -212.912 -10058.452 9381.092 4.00 1.75 3.87
12872.042 69.957 297.456 7175.000 -183.281 -10118.973 9448.094 4.00 1.80 3.82
TOP KUPARUK
- 12900.000 70.471 298.512 7184.465 -170.937 -10142.204 9474.144 4.00 1.84 3.78
13000.000 72.356 302.234 7216.347 -123.009 -10223.950 9567.342 4.00 1.89 3.72
13018.838 72.719 302.926 7222.000 -113.333 -10239.092 9584.878 4.00 1.93 3.67
LCU
5/10/200410:28:44AM
Page 5 of 8
ORIGINAL
COMPASS 2003.5
Co~illips
.
.
SPERRY_SUN HES
Planning Report
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True
Minimum Curvature
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine C02
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
SpE!r'r'y-sun
DRIL.L.ING seRVices
A HALLIBURTON COMPANY
13100.000 74.310 305.878 7245.036 -69.362 -10303.290 9660.233 4.00
13126.175 74.831 306.820 7252.000 -54.407 -10323.612 9684.440 4.00
CD2-31 (Toe)
13200.000 76.323 309.452 7270.391 -10.256 -10379.838 9752.363 4.00
13211.125 76.550 309.845 7273.000 -3.355 -10388.165 9762.546 4.00
MILUVEACH A
13288.744 78.151 312.571 7290.000 46.536 -10445.131 9833.124 4.00
ALPINE D
13300.000 78.386 312.964 7292.289 54.020 -10453.221 9843.284 4.00
13367.157 79.795 315.293 7305.000 99.931 -10500.547 9903.443 4.00
ALPINE C
13400.000 80.491 316.424 7310.623 123.152 -10523.082 9932.553 4.00
13440.414 81.351 317.810 7317.000 152.394 -10550.238 9968.062 4.00
UJU
13500.000 82.629 319.842 7325.303 196.805 -10589.079 10019.735 4.00
13600.000 84.794 323.226 7336.259 274.619 -10650.893 10104.405 4.00
13700.000 86.976 326.587 7343.437 356.215 -10708.221 10186.151 4.00
13737.000 87.786 327.827 7345.128 387.285 -10728.238 10215.575 4.00
7" Csg pt...Continue Dir@4.00: Begin 6-1/8" Hole: 13737.000' MD, 7345' TVD - 7" @ 13737' MD
13800.000 89.168 329.935 7346.802 441.196 -10760.784 10264.574 4.00
13857.885 90.439 331.870 7347.000 491.772 -10788.931 10308.300 4.00
Target Heel: Begin GeoSteer; 13858' MD, 7347' TVD, (1391FNL & 1753FEL, Sec4-T11N-R4E) - CD2-31 (Heel)
13900.000 90.439 331.870 7346.677 528.911 -10808.786 10339.644 0.00
14000.000 90.439 331.870 7345.910 617.097 -10855.932 10414.070 0.00
14100.000 90.439 331.870 7345.143 705.282 -10903.077 10488.496 0.00
14200.000 90.439 331.870 7344.376 793.468 -10950.223 10562.922 0.00
14300.000 90.439 331.870 7343.609 881.654 -10997.368 10637.348 0.00
14400.000 90.439 331.870 7342.842 969.839 -11044.514 10711.773 0.00
14500.000 90.439 331.870 7342.075 1058.025 -11091.659 10786.199 0.00
14600.000 90.439 331.870 7341.308 1146.211 -11138.805 10860.625 0.00
14700.000 90.439 331.870 7340.541 1234.396 -11185.950 10935.051 0.00
14800.000 90.439 331.870 7339.774 1322.582 -11233.096 11009.477 0.00
14900.000 90.439 331.870 7339.007 1410.767 -11280.242 11083.902 0.00
15000.000 90.439 331.870 7338.240 1498.953 -11327.387 11158.328 0.00
15100.000 90.439 331.870 7337.473 1587.139 -11374.533 11232.754 0.00
15200.000 90.439 331.870 7336.706 1675.324 -11421.678 11307.180 0.00
15300.000 90.439 331.870 7335.939 1763.510 -11468.824 11381.606 0.00
15400.000 90.439 331.870 7335.172 1851.696 -11515.969 11456.031 0.00
15500.000 90.439 331.870 7334.405 1939.881 -11563.115 11530.457 0.00
15600.000 90.439 331.870 7333.638 2028.067 -11610.261 11604.883 0.00
15700.000 90.439 331.870 7332.871 2116.253 -11657.406 11679.309 0.00
15800.000 90.439 331.870 7332.104 2204.438 -11704.552 11753.735 0.00
15900.000 90.439 331.870 7331.337 2292.624 -11751.697 11828.160 0.00
16000.000 90.439 331.870 7330.570 2380.810 -11798.843 11902.586 0.00
16100.000 90.439 331.870 7329.803 2468.995 -11845.988 11977.012 0.00
16200.000 90.439 331.870 7329.036 2557.181 -11893.134 12051.438 0.00
16300.000 90.439 331.870 7328.269 2645.367 -11940.279 12125.864 0.00
16400.000 90.439 331.870 7327.502 2733.552 -11987.425 12200.290 0.00
16500.000 90.439 331.870 7326.735 2821.738 -12034.571 12274.715 0.00
16600.000 90.439 331.870 7325.968 2909.923 -12081.716 12349.141 0.00
16700.000 90.439 331.870 7325.201 2998.109 -12128.862 12423.567 0.00
16800.000 90.439 331.870 7324.434 3086.295 -12176.007 12497.993 0.00
16900.000 90.439 331.870 7323.667 3174.480 -12223.153 12572.419 0.00
17000.000 90.439 331.870 7322.900 3262.666 -12270.298 12646.844 0.00
17100.000 90.439 331.870 7322.133 3350.852 -12317.444 12721.270 0.00
17200.000 90.439 331.870 7321.366 3439.037 -12364.589 12795.696 0.00
17300.000 90.439 331.870 7320.599 3527.223 -12411.735 12870.122 0.00
17400.000 90.439 331.870 7319.832 3615.409 -12458.881 12944.548 0.00
5/10/200410:28:44AM
Page 6 of 8
ORIGINAL
1.96 3.64
1.99 3.60
2.02 3.56
2.04 3.54
2.06 3.51
2.08 3.49
2.10 3.47
2.12 3.44
2.13 3.43
2.14 3.41
2.16 3.38
2.18 3.36
2.19 3.35
2.19 3.35
2.20 3.34
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
COMPASS 2003.5
conocJ.Phillips
.
SPERRY_SUN HES
Planning Report
.
spel""'I""'v-sun
DRILLING seRVices
A HAWBURTON COMPANY
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
EDM 2003.5 Single User Db
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Plan: CD2-31 (wp05)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD2-31
52 @ 52.000ft (52)
52 @ 52.000ft (52)
True /
Minimum Curvature
17500.000 90.439 331.870 7319.065 3703.594 -12506.026 13018.973 0.00 0.00 0.00
17600.000 90.439 331.870 7318.298 3791.780 -12553.172 13093.399 0.00 0.00 0.00
17700.000 90.439 331.870 7317.531 3879.966 -12600.317 13167.825 0.00 0.00 0.00
17800.000 90.439 331.870 7316.764 3968.151 -12647.463 13242.251 0.00 0.00 0.00
17900.000 90.439 331.870 7315.997 4056.337 -12694.608 13316.677 0.00 0.00 0.00
18000.000 90.439 331.870 7315.230 4144.522 -12741.754 13391.102 0.00 0.00 0.00
18100.000 90.439 331.870 7314.463 4232.708 -12788.899 13465.528 0.00 0.00 0.00
18200.000 90.439 331.870 7313.696 4320.894 -12836.045 13539.954 0.00 0.00 0.00
18300.000 90.439 331.870 7312.929 4409.079 -12883.191 13614.380 0.00 0.00 0.00
18400.000 90.439 331.870 7312.162 4497.265 -12930.336 13688.806 0.00 0.00 0.00
18500.000 90.439 331.870 7311.395 4585.451 -12977.482 13763.231 0.00 0.00 0.00
18600.000 90.439 331.870 7310.628 4673.636 -13024.627 13837.657 0.00 0.00 0.00
~·18681.879 90.439 331.870 7310.000 4745.842 -13063.229 13898.596 0.00 0.00 0.00
Target Toe: 18681'MD, 7310'TVD; (2420FNL & 4024FEL, Sec33-T12N_R4E) _ 61/8" Open Hole _ CD2-31 (New Toe)
Targets
Target Name
Shape
TVD Northing Eastirìg +N/oS +EI-W
(ft) (usft) (usft) ft ft
7310.000 5979451.000 358734.000 4745.842 -13063.229 4/27/2004 5/612004
7347.000 5975159.000 360935.000 491.772 -10788.931 2/23/2004 5/6/2004
7252.000 5977674.000 359645.000 2984.541 -12121.882 2/23/2004 4/29/2004
CD2-31 (New Toe)
CD2-31 (Heel)
CD2-31 (Toe)
Point
Rectangle
Point
Casing Points
Measurèd
Depth
(ft)
3309.065
13737.000
18681.800
Vertical
Depth
(ft)
2390.005 95/8" @ 3309' MD
7345.128 7" @ 13737' MD
7310.001 61/8" Open Hole
Name
Casing
Diameter
(in)
9.625
7.000
6.125
12.250
8.500
6.125
5I10/200410:28:44AM
Page 70r8
COMPASS 2003.5
ORIGINAL
ANTI-COLLISION SETTINGS
Noohing
¡9.~2 5974482.170
""""
Ùl.1i1Id" l.o~ Sb
70"20'18.665N 151"02'27513W
Interpolation Method:MD
Depth Range From: 36.10
Maximum Range: 1978.97
COllOcoPhilipsAlaskaInc
Engineering
A\>fu<
PLAN: CD2-31
Rig:
Ref Datum " 52.00ft
V.Seçtion Origm Origm ~~
Anglo +NI-S +EJ-W
289.96T 0.00 0.00 36.lO
Interval: 50.00
To; 18681.74
Reference: Plan: CD2·31 (wp05)
CaJcuhoon Method: Miuiumlll CQrvalllre
=t;::~~ ¥';V~~eT Nonh
&rer $urnu:e: EUiptk-a1 + Casing
WarningMi>thod: Rules Based
Colour To MD
300
400
500
750
1000
1250
1500
1750
2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
1??oo
10500
11000
12000
13000
24
48
-72
-96
100
SECTION DETAILS
See MD Ine A2i TVD +N/-S +EI-W DLeg TFace VSee Target
36.10 0.000 0.000 36.10 0.00 0.00 0.00 0.000 0.00
400_00 0_000 0.000 400.00 0.00 0.00 0.00 0.000 0.00
700.00 9.000 270_000 Œ8_77 0.00 -23.51 3.00 270.000 22.10
1965-59 59.617 267.984 1710.51 -20.56 -713.54 4.00 -2.250 663.64
12159.71 59.617 267.984 6866.40 -329.89 -9502.24 0.00 0.000 8818.44
13857.93 90.439 331.875 7347.00 491.74 -10788.91 4.00 75_681 10308.33 CD2-3! (Heel)
!8681.74 90.439 331.875 7310.00 4745.82 -13062.80 0.00 0.000 13898.18 CD2-31 (New Toe)
Travelling Cylinder Azimuth (1:'FO+AZI) [deg] VS Ce¡¡tretÓ Centre $epar<tÜon [ft]
CD2-29 (CD2-29)
C
Colour To
.7
0.0
·15.0
750
1000
1250
1500
!750
2000
2500
3000
3500
4000
4500
5000
5500
6500
7500
8500
9500
10000
10500
11000
12000
13000
5.0
0 27
5.0
~JO.O
-15.0
28-0
_7
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in]
. .
Halliburton Sperry-Sun
Anticollision Report
sp.PPY-1&U"1
D..ILLING ....vle..
.\uuu..,.O'I(O'...".....
ce Site:
eWell:
. Reference Wellpath:
Co-ordinate(NE) Reference;
Vertical (TVD) Reference:
Plan: CD2-31 (wp05) & NOT PLANNED P
ISCW SA Ellipse
Trav Cyfinder North
Ellipse + Casing
Company:
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31
Date: 5/10/2004
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 36.10 to 18681.74 ft
Maximum Radius: 1978.97 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Casing Points
MD TVD Diameter Hole Size NlìIJ1e
ft ft in in
3309.06 2390.00 9.625 12.250 95/8" @ 3314' MD
13723.00 7344.55 7.000 8.500 7' @ 13723' MD
18666.75 7310.11 6.125 6.125 61/8" Open Hole
Plan: CD2-31 (wp05) Date Composed: 5/312004
Version: 24
Principal: Yes Tied·to: User Defined
Sununary
<...-."-....----..-.-.. Offset WeUpath -...--.--...-...--....> Reference Offset Ctr-Ctr No.Go
Site Well Wellpath MD MD Distance. Area
ft ft ft ft
Alpine CO2 CD2-07 CD2-07 V2 149.22 150.00 241.04 3.05 237.99 Pass: Major Risk
Alpine CD2 CD2-07 CD2-07PB1 V4 149.22 150.00 241.04 2.94 238.10 Pass: Major Risk
Alpine CD2 CD2-07 CD2-07PB2 V2 149.22 150.00 241.04 2.94 238.10 Pass: Major Risk
Alpine CD2 CD2-08 CD2-D8 V9 Plan: CD2-OB 299.58 300.00 231.17 6.31 224.86 Pass: Major Risk
Alpine CD2 CD2-10 CD2-10 V2 551.35 550.00 210.36 9.57 200.79 Pass: Major Risk
Alpine CD2 CD2-10 CD2-10PB1 V6 551.35 550.00 210.36 9.46 200.90 Pass: Major Risk
Alpine CD2 CD2-12 CD2-12 V7 299.76 300.00 190.23 5.72 184.51 Pass: Major Risk
Alpine CO2 CD2-13 CD2-13 V1 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk
Alpine CD2 CD2-13 CD2-13PB1 V10 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk
Alpine CD2 CD2-13 CD2-13PB2 V4 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk
Alpine CD2 CD2·14 CD2-14 V1 549.87 550.00 170.01 9.06 160.96 Pass: Major Risk
Alpine CO2 CD2·15 CD2-15 V3 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk
Alpine CD2 CD2-15 CD2-15PB1 V1 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk
Alpine CD2 CD2-15 CD2-15PB2 V2 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk
Alpine CD2 CD2-16 CD2-16 (Sag) VO 499.44 500.00 151.24 8.46 142.78 Pass: Major Risk
Alpine CD2 CD2-16 CD2-16 V7 499.40 500.00 151.29 9.01 142.27 Pass: Major Risk
Alpine CD2 CD2-17 CD2-17 VO 649.33 650.00 140.15 10.69 129.46 Pass: Major Risk
Alpine CD2 CD2-18 CD2-18 (sag) VO 349.68 350.00 131.44 6.28 125.16 Pass: Major Risk
Alpine CD2 CD2-18 CD2-18 V7 399.59 400.00 132.45 7.95 124.50 Pass: Major Risk
Alpine CO2 CD2-18 CD2-18PB1 (Sag) VO 349.68 350.00 131.44 6.28 125.16 Pass: Major Risk
Alpine CO2 CD2-18 CD2-18PB1 V3 399.59 400.00 132.45 7.95 124.50 Pass: Major Risk
Alpine CD2 CD2-19 CD2-19 V8 598.16 600.00 115.29 9.81 105.48 Pass: Major Risk
Alpine CD2 CD2-2O CD2-2O V4 299.51 300.00 111.57 5.77 105.80 Pass: Major Risk
Alpine CD2 CD2-22 CD2-22 V1 698.38 700.00 84.82 10.95 73.87 Pass: Major Risk
Alpine CD2 CD2-23 CD2-23 V2 803.30 800.00 88.27 12.78 75.49 Pass: Major Risk
Alpine CD2 CD2-23 CD2-23PB1 V12 803.30 800.00 88.27 12.89 75.38 Pass: Major Risk
Alpine CO2 CD2-24 CD2-24 VO 749.53 750.00 71.21 12.70 58.51 Pass: Major Risk
Alpine CD2 CD2-24 CD2-24PB1 V1 749.53 750.00 71.21 12.70 58.51 Pass: Major Risk
Alpine CD2 CD2-25 CD2-25 V1 698.51 700.00 58.06 11.23 46.83 Pass: Major Risk
Alpine CD2 CD2-26 CD2-26 V4 250.09 250.00 49.98 4.52 45.46 Pass: Major Risk
Alpine CD2 CD2-26 CD2-26PB1 V2 700.32 700.00 37.83 11.22 26.61 Pass: Major Risk
Alpine CD2 CD2-26 CD2-26PB2 V3 490.33 490.00 40.54 No Offset Errors
Alpine CD2 CD2-27 CD2-27 V6 497.23 500.00 30.60 10.35 20.25 Pass: Major Risk
Alpine CD2 CD2-28 CD2-28 V3 399.33 400.00 31.62 7.44 24.18 Pass: Major Risk
Alpine CD2 CD2-28 CD2-28PB1 V13 399.33 400.00 31.62 7.55 24.07 Pass: Major Risk
Alpine CD2 CD2-29 CD2-29 V1 449.39 450.00 21.51 7.78 13.73 Pass: Major Risk
Alpine CD2 CD2-3O CD2-3O V8 249.26 250.00 10.41 4.51 5.90 Pass: Major Risk
Alpine CD2 CD2-32 CD2-32 PB1 VO 498.99 500.00 10.96 8.60 2.36 Pass: Major Risk
Alpine CD2 CD2-32 CD2-32 VO 498.99 500.00 10.96 8.49 2.47 Pass: Major Risk
Alpine CD2 CD2-33 CD2-33 V2 449.88 450.00 21.22 7.48 13.75 Pass: Major Risk
Alpine CD2 CD2-33 CD2-33A V1 449.88 450.00 21.22 7.43 13.79 Pass: Major Risk
Alpine CD2 CD2-33 CD2-34B V1 449.88 450.00 21.22 7.48 13.75 Pass: Major Risk
Alpine CD2 CD2-34 CD2-34 V3 399.69 400.00 25.22 7.62 17.60 Pass: Major Risk
Alpine CD2 CD2-34 CD2-34PB1 V2 399.69 400.00 25.22 7.73 17.49 Pass: Major Risk
Alpine CD2 CD2-35 CD2-35 V1 413.28 400.00 42.05 7.17 34.88 Pass: Major Risk
Alpine CD2 CD2-35 CD2-35A V1 449.16 450.00 42.59 7.61 34.98 Pass: Major Risk
ORIGINAL
-Halliburton - .p. . y-~
Sperry-SUD
D..ILLIND: ....VIC..
Anticollision Report ~ U'U'''1ntrt n-.~"
C~mIJ!!)Jy: COI'lOé()Phillips Alaska Inc. Date: 5/10/2004 Time: 10:25:06
Cþ\lillêRiver Unit
ncêSite: AlpinaCD2 Co-ordinate(NE) Rererence:
nceWelh Plan:CD2-31 Vel:1ical(TVI»ReferenÇe:
~efeJ:"~nÇeWeUI>atb; P!.AN: CD2-31
Summary
<-~---.;---.._-----.---- Offset WeUpatb -----_____________> Reference Offset CIr-ClrNo-Go
Site Well WeUpatb MÐ MÐ ÐiStaDceArea
ft ft ft ft
Alpine CD2 CD2-36 CD2-36 Lat 1 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-36 CD2-36 Lat 2 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-36 CD2-36 Lat 3 V2 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-36 CD2-36 Lat 4 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-36 CD2-36 PB1 V5 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-36 CD2-36 V5 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk
Alpine CD2 CD2-37 CD2-37 Lat 1 V2 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk
Alpine CD2 CD2-37 CD2-37 Lat 2 V1 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk
Alpine CO2 CD2-37 CD2-37 Lat 3 V1 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk
Alpine CD2 CD2-37 CD2-37 V16 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk
Alpine CD2 CD2-38 CD2-38 (Sag) VO 399.49 400.00 72.00 6.90 65.10 Pass: Major Risk
Alpine CD2 CD2-38 CD2-38 V5 349.49 350.00 71.11 6.24 64.87 Pass: Major Risk
Alpine CD2 CD2-39 CD2-39 V1 249.99 250.00 81.01 4.23 76.77 Pass: Major Risk
Alpine CD2 CD2-39 CD2-39PB1 VO 249.09 250.00 80.99 4.22 76.77 Pass: Major Risk
Alpine CO2 CD2-40 CD2-40 V7 499.04 500.00 90.87 8.23 82.65 Pass: Major Risk
Alpine CD2 CD2-40 CD2-40PB1 V9 499.04 500.00 90.87 8.23 82.65 Pass: Major Risk
Alpine CD2 CD2-41 CD2-41 V9 547.76 550.00 101.75 9.78 91.97 Pass: Major Risk
Alpine CD2 CD2-42 CD2-42 VO 499.24 500.00 111.59 8.28 103.31 Pass: Major Risk
Alpine CD2 CD2-42 CD2-42PB1 VO 499.24 500.00 111.59 8.28 103.31 Pass: Major Risk
Alpine CD2 CD2-43 CD2-43 (Sag) VO 399.13 400.00 119.37 6.88 112.49 Pass: Major Risk
Alpine CD2 CD2-43 C02-43 V8 399.13 400.00 119.37 7.26 112.10 Pass: Major Risk
Alpine CD2 CD2-43 CD2-43PB1 (Sag) VO 399.13 400.00 119.37 6.88 112.49 Pass: Major Risk
Alpine CD2 CD2-43 CD2-43PB1 V8 399.13 400.00 119.37 7.26 112.10 Pass: Major Risk
Alpine CD2 CD2-44 CD2-44 V15 498.30 500.00 130.87 9.15 121.72 Pass: Major Risk
Alpine CO2 CD2-45 CD2-45 V5 349.27 350.00 139.24 6.18 133.07 Pass: Major Risk
Alpine CD2 CD2-46 CD2-46 V2 448.93 450.00 151.62 7.37 144.24 Pass: Major Risk
Alpine CO2 CD2-47 CD2-47 V2 349.36 350.00 161.08 6.12 154.96 Pass: Major Risk
Alpine CD2 CD2-48 C02-48 V1 449.10 450.00 170.10 8.23 161.87 Pass: Major Risk
Alpine CD2 CD2-49 CD2-49 V1 249.29 250.00 180.84 4.23 176.61 Pass: Major Risk
Alpine CD2 CD2-50 CD2-50 V2 449.01 450.00 189.68 8.35 181.33 Pass: Major Risk
Alpine CD2 CO2-50 CD2-50PB1 V2 449.01 450.00 189.68 8.35 181.33 Pass: Major Risk
Alpine CD2 CO2-51 CD2-51 V8 497.42 500.00 197.61 9.64 187.97 Pass: Major Risk
Alpine CO2 CD2-52 CD2-52 V6 249.54 250.00 211.19 5.09 206.10 Pass: Major Risk
Alpine CD2 CD2-55 CD2-55 V5 249.58 250.00 241.11 4.84 236.27 Pass: Major Risk
Alpine CO2 Plan: CD2-05 Plan: CD2-o5 V5 Plan: 1853.42 1900.00 118.47 29.82 88.65 Pass: Major Risk
Alpine CD2 Plan: CD2-09 Plan: CD2-09 VO Plan: 349.99 350.00 220.63 6.62 214.02 Pass: Major Risk
Alpine CD2 Plan: CD2-11 Plan: CD2-11 V2 Plan: 399.63 400.00 201.52 7.32 194.20 Pass: Major Risk
Alpine CD2 Plan: CD2-21 Plan C02-21 A VO Plan: 349.99 350.00 100.51 6.49 94.01 Pass: Major Risk
Alpine CD2 Plan: CD2-21 Plan CD2-21 B VO Plan: 349.99 350.00 100.51 6.49 94.01 Pass: Major Risk
Alpine CD2 Plan: CD2-21 Plan: CD2-21 VO Plan: 349.99 350.00 100.51 6.60 93.90 Pass: Major Risk
Alpine CD2 Plan: CD2-54 Plan: CD2-54 VO Plan: 299.92 300.00 231.00 5.52 225.48 Pass: Major Risk
Alpine CD2 Plan: CD2-56 Plan: CD2-56 VO Plan: 249.99 250.00 250.26 4.66 245.60 Pass: Major Risk
Alpine CD2 Prelim: CD2-53 CD2-53 VO Plan: CO2-53 349.99 350.00 220.54 7.20 213.34 Pass: Major Risk
Alpine Satellites Alpine West 1 VO Plan: (Prelim) V1 18678.27 13450.00 1432.56 443.37 989.19 Pass: Major Risk
Alpine Satellites Alpine West 2 VO Plan: (Prelim) V1 14381.99 11100.00 1459.55 278.16 1181.39 Pass: Major Risk
ORIGINAL
.
.
GLOBAL SCAN:
Interpolation Method: TVO
Depth Range:to 7300.(1) ft
Maximum Radius: 2000.00 ft
Casing Points
SPERRY SUN
Anticollision Report
Interval:
7357.00
1.00 ft
Plan: C02-31 (wp05) & NOT PLANNEO P
ISCWSA Ellipse
Horizontal Plane
Ellipse + Casing
3309.06 2390.00 9.625
13737.00 7345.13 7.000
18681.74 7310.00 6.125
Plan: C02-31 (wp05)
Principal: Yes
Summary
12.250
8.500
6.125
9 5/8" @ 3309' MD
7" @ 13737' MD
Open Hole
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine CD2
Alpine CD2
Alpine C02
Alpine CD2
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
Alpine C02
C02-08
C02-12
C02-13
C02-13
C02-13
C02-14
CD2-15
C02-15
CD2-15
C02-16
C02-16
C02-17
C02-18
C02-18
C02-19
C02-20
C02-22
C02-23
CD2-23
CD2-24
C02-24
CD2-25
C02-26
C02-26
C02-26
C02-28
CD2-28
C02-29
C02-30
CD2-32
C02-32
CD2-33
C02-33
C02-33
C02-34
C02-34
C02-35
C02-35
C02-36
C02-36
C02-37
C02-38
C02-39
C02-39
C02-41
C02-42
Date Composed:
Version:
Tied-to:
05/03/2004
24
From Well Ref. Point
CD2-08 V8
C02-12 V7
C02-13 V1
C02-13PB1 V10
CD2-13PB2 V4
C02-14 V1
CD2-15 V3
CD2-15PB1 V1
CD2-15PB2 V2
CD2-16 (Rig Surveys) V
CD2-16 V7
CD2-17 VO
CD2~18 V7
CD2-18PB1 V3
C02-19 V8
CD2-20 V4
CD2-22 V1
CD2-23 V2
C02-23PB1 V12
CD2-24 VO
CD2-24PB1 V1
CD2-25 V1
CD2-26 V4
CD2-26PB1 V2
CD2-26PB2 V3
C02-28 V3
C02'-28PB1 V13
C02-29 V1
Plan: C02-30 V4 Plan: 12845.70 15094.87 1944.08 187.98 1756.10
CD2-32 PB1 VO
CD2-32 VO
C02-33 V2
C02-33A V1
C02-34B V1
C02-34 V3
CD2-34PB1 V2
CD2·35 V1
C02-35A V1
CD2-36 PB1 V5
CD2-36 V5
CD2-37 V16
CD2-38 V5
C02-39 V1
C02-39PB1 VO
C02-41 V9
C02-42 VO
n rR I G·.···'1 I NJA L
Vii g _¡~
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Pass: Major Risk
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
ConocoPhillips Alaska Inc. (Alpine)
Colville River Unit
Alpine CD2
Plan: CD2-31
PLAN: CD2-31 (wp05)
MD Inc Azim. SSTVD TVD N/S EIW Y X DLS V.S. Comment
36.10 0.00 0.00 -15.90 36.10 0.00 N 0.00 5974482.77 N 371713.04 E 0.00 0.00 SHL=1875'FNL&1526'FEL; Sec2-'
100.00 0.00 0.00 48.00 100.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 CB-GYRO-SS (1)
200.00 0.00 0.00 148.00 200.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00
300.00 0.00 0.00 248.00 300.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00
400.00 0.00 0.00 348.00 400.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 Begin Dir ~400.010'TVD
500.00 3.00 270.00 447.95 499.95 0.00 S 2.62W 5974482.82 N 371710.42 E 3.00 2.46
600.00 6.00 270.00 547.64 599.64 0.00 S 10.46 W 5974482.95 N 371702.58 E 3.00 9.83 .
700.00 9.00 270.00 646.77 698.77 0.00 S 23.51 W 5974483.17 N 371689.53 E 3.00 22.10 Continue D 698.778' TVD
800.00 13.00 269.30 744.91 796.91 0.14 S 42.59 W 5974483.36 N 371670.46 E 4.00 39.98
900.00 17.00 268.93 . 841.49 893.49 0.55S 68.46 W 5974483.39 N 371644.59 E 4.00 64.15
t-«:) 1 000.00 21.00 268.70 936.02 988.02 1.23 S 100.99 W 5974483.27 N 371612.05 E 4.00 94.50
~w 1100.00 25.00 268.53 1028.06 1080.06 2.18 S 140.04 W 5974482.99 N 371573.00 E 4.00 130.88
""""1"'., 1200.00 29.00 268.41 1117.14 1169.14 3.39 S 185.41 W 5974482.55 N 371527.62 E 4.00 173.10 MWD+IFR-AK-CAZ-SC (2)
oÞ~ 1300.00 33.00 268.32 1202.85 1254.85 4.86 S 236.87 W 5974481.96 N 371476.14 E 4.00 220.97
f"~~.:;p 1400.00 37.00 268.25 1284.75 1336.75 6.58 S 294.18 W 5974481.23 N 371418.81 E 4.00 274.25
"j) 1500.00 40.99 268.18 1362.45 1414.45 8.54 S 357.07 W 5974480.34 N 371355.91 E 4.00 332.68
ß ¡ . 1600.00 44.99 268.13 1435.58 1487.58 10.74 S 425.21 W 5974479.31 N 371287.75 E 4.00 395.98
'"'" .
1700.00 48.99 268.09 1503.77 1555.78 13.15 S 498.28 W 5974478.15 N 371214.65 E 4.00 463.84
Z 1800.00 52.99 268.04 1566.70 1618.70 15.78 S 575.93 W 5974476.85 N 371136.97 E 4.00 535.92
1'".~ 1900.00 56.99 268.01 1624.06 1676.06 18.60 S 657.77 W 5974475.43 N 371055.10 E 4.00 611.88
):> 1965.59 59.62 267.99 1658.52 1710.52 20.55 S 713.54 W 5974474.43 N 370999.31 E 4.00 663.63 End Dir Start Sail I 1710.519'
2000.00 59.62 267.99 1675.92 1727.92 21.59 S 743.21 W 5974473.90 N 370969.63 E 0.00 691.16
r 2100.00 59.62 267.99 1726.49 1778.50 24.63 S 829.42 W 5974472.34 N 370883.39 E 0.00 771.15
2200.00 59.62 267.99 1777.07 1829.07 27.66 S 915.64 W 5974470.78 N 370797.14 E 0.00 851.15
2300.00 59.62 267.99 1827.65 1879.65 30.69 S 1001.85 W 5974469.22 N 370710.90 E 0.00 931.14
2400.00 59.62 267.99 1878.23 1930.23 33.73 S 1088.06 W 5974467.67 N 370624.65 E 0.00 1011.14
2500.00 59.62 267.99 1928.80 1980.80 36.76 S 1174.28 W 5974466.11 N 370538.41 E 0.00 1091.13
2600.00 59.62 267.99 1979.38 2031.38 39.79 S 1260.49 W 5974464.55 N 370452.16 E 0.00 1171.13
2700.00 59.62 267.99 2029.96 2081 .96 42.83 S 1346.70 W 5974462.99 N 370365.91 E 0.00 1251.12
2800.00 59.62 267.99 2080.53 2132.53 45.86 S 1432.92 W 5974461.44 N 370279.67 E 0.00 1331.12 .
2900.00 59.62 267.99 2131.11 2183.11 48.89 S 1519.13 W 5974459.88 N 370193.42 E 0.00 1411.11
3000.00 59.62 267.99 2181.69 2233.69 51.93 S 1605.34 W 5974458.32 N 370107.18 E 0.00 1491.11
3063.89 59.62 267.99 2214.00 2266.00 53.86 S 1660.42 W 5974457.33 N 370052.08 E 0.00 1542.21 C-40
3100.00 59.62 267.99 2232.27 2284.27 54.96 S 1691.56 W 5974456.76 N 370020.93 E 0.00 1571.10
3200.00 59.62 267.99 2282.84 2334.84 57.99 S 1777.77 W 5974455.20 N 369934.69 E 0.00 1651.10
3300.00 59.62 267.99 2333.42 2385.42 61.03 S 1863.98 W 5974453.65 N 369848.44 E 0.00 1731.09
3309.06 59.62 267.99 2338.00 2390.00 61.30 S 1871.79 W 5974453.51 N 369840.63 E 0.00 1738.34 9-5/8'" Csg 2390.000'TVD - 9 5/8'
3400.00 59.62 267.99 2384.00 2436.00 64.06 S 1950.20 W 5974452.09 N 369762.20 E 0.00 1811.09
3465.25 59.62 267.99 2417.00 2469.00 66.04 S 2006.45 W 5974451.07 N 369705.92 E 0.00 1863.29 C-30
3500.00 59.62 267.99 2434.57 2486.57 67.09 S 2036.41 W 5974450.53 N 369675.95 E 0.00 1891.08
3600.00 59.62 267.99 2485.15 2537.15 70.13 S 2122.62 W 5974448.97 N 369589.70 E 0.00 1971.08
3700.00 59.62 267.99 2535.73 2587.73 73.16 S 2208.84 W 5974447.42 N 369503.46 E 0.00 2051.07
3800.00 59.62 267.99 2586.31 2638.31 76.19 S 2295.05 W 5974445.86 N 369417.21 E 0.00 2131.07
3900.00 59.62 267.99 2636.88 2688.88 79.23 S 2381.26 W 5974444.30 N 369330.97 E 0.00 2211.06
4000.00 59.62 267.99 2687.46 2739.46 82.26 S 2467.48 W 5974442.74 N 369244.72 E 0.00 2291.06
4100.00 59.62 267.99 2738.04 2790.04 85.29 S 2553.69 W 5974441.19 N 369158.48 E 0.00 2371.05
4186.92 59.62 267.99 2782.00 2834.00 87.938 2628.63 W 5974439.83 N 369083.51 E 0.00 2440.59 C-20
4200.00 59.62 267.99 2788.61 2840.61 88.33 8 2639.90 W 5974439.63 N 369072.23 E 0.00 2451.05
4300.00 59.62 267.99 2839.19 2891.19 91.368 2726.12 W 5974438.07 N 368985.99 E 0.00 2531.04
4400.00 59.62 267.99 2889.77 2941.77 94.39 8 2812.33 W 5974436.51 N 368899.74 E 0.00 2611.04
4500.00 59.62 267.99 2940.35 2992.35 97.43 8 2898.54 W 5974434.95 N 368813.50 E 0.00 2691.03
4600.00 59.62 267.99 2990.92 3042.92 100.46 8 2984.76 W 5974433.40 N 368727.25 E 0.00 2771.03
4700.00 59.62 267.99 3041.50 3093.50 103.498 3070.97 W 5974431.84 N 368641.00 E 0.00 2851.02
4800.00 59.62 267.99 3092.08 3144.08 106.538 3157.19 W 5974430.28 N 368554.76 E 0.00 2931.02
4900.00 59.62 267.99 3142.65 3194.65 109.568 3243.40 W 5974428.72 N 368468.51 E 0.00 3011.01
5000.00 59.62 267.99 3193.23 3245.23 112.598 3329.61 W 5974427.17 N 368382.27 E 0.00 3091.01
5100.00 59.62 267.99 3243.81 3295.81 115.628 3415.83 W 5974425.61 N 368296.02 E 0.00 3171.00
5200.00 59.62 267.99 3294.39 3346.39 118.668 3502.04 W 5974424.05 N 368209.78 E 0.00 3251.00
5300.00 59.62 267.99 3344.96 3396.96 121.69 8 3588.25 W 5974422.49 N 368123.53 E 0.00 3330.99
5400.00 59.62 267.99 3395.54 3447.54 124.72 8 3674.47 W 5974420.94 N 368037.29 E 0.00 3410.99
5500.00 59.62 267.99 3446.12 3498.12 127.76 8 3760.68 W 5974419.38 N 367951.04 E 0.00 3490.98 .
5600.00 59.62 267.99 3496.69 3548.69 130.79 8 3846.89 W 5974417.82 N 367864.79 E 0.00 3570.98
5700.00 59.62 267.99 3547.27 3599.27 133.828 3933.11 W 5974416.26 N 367778.55 E 0.00 3650.97
5500.00 59.62 267.99 3597.85 3649.85 136.868 4019.32 W 5974414.70 N 367692.30 E 0.00 3730.97
5900.00 59.62 267.99 3648.43 3700.43 139.898 4105.53 W 5974413.15 N 367606.06 E 0.00 3810.96
6000.00 59.62 267.99 3699.00 3751.00 142.928 4191.75 W 5974411.59 N 367519.81 E 0.00 3890.96
6100.00 59.62 267.99 3749.58 3801 .58 145.968 4277.96 W 5974410.03 N 367433.57 E 0.00 3970.95
6200.00 59.62 267.99 3800.16 3852.16 148.998 4364.17 W 5974408.47 N 367347.32 E 0.00 4050.95
~.~"/L'.:."~~",,,,_. 6286.69 59.62 267.99 3844.00 3896.00 151.628 4438.91 W 5974407.12 N 367272.56 E 0.00 4120.29 K-3 MARKER
6300.00 59.62 267.99 3850.73 3902.73 152.02 8 4450.39 W 5974406.92 N 367261.08 E 0.00 4130.94
6400.00 59.62 267.99 3901.31 3953.31 155.068 4536.60 W 5974405.36 N 367174.83 E 0.00 4210.94
!;,"';~,.. 6500.00 59.62 267.99 3951.89 4003.89 158.09 8 4622.81 W 5974403.80 N 367088.58 E 0.00 4290.93
6600.00 59.62 267.99 4002.46 4054.46 161.128 4709.03 W 5974402.24 N 367002.34 E 0.00 4370.93
6666.31 59.62 267.99 4036.00 4088.00 163.148 4766.19 W 5974401.21 N 366945.15 E 0.00 4423.97 BA8AL K-3 88
):> 6700.00 59.62 267.99 4053.04 4105.04 164.168 4795.24 W 5974400.69 N 366916.09 E 0.00 4450.92
6721.67 59.62 267.99 4064.00 4116.00 164.81 8 4813.92 W 5974400.35 N 366897.41 E 0.00 4468.25 K-2 MARKER
i' 6800.00 59.62 267.99 4103.62 4155.62 167.198 4881.45 W 5974399.13 N 366829.85 E 0.00 4530.92
6891.71 59.62 267.99 4150.00 4202.00 169.97 8 4960.52 W 5974397.70 N 366750.76 E 0.00 4604.28 BA8E K-2 8EQUENCE
6900.00 59.62 267.99 4154.20 4206.20 170.22 8 4967.67 W 5974397.57 N 366743.60 E 0.00 4610.91
7000.00 59.62 267.99 4204.77 4256.77 173.26 8 5053.88 W 5974396.01 N 366657.36 E 0.00 4690.91
7100.00 59.62 267.99 4255.35 4307.35 176.29 8 5140.09 W 5974394.45 N 366571.11 E 0.00 4770.90
7200.00 59.62 267.99 4305.93 4357.93 179.32 8 5226.31 W 5974392.90 N 366484.87 E 0.00 4850.90
7300.00 59.62 267.99 4356.50 4408.50 182.36 8 5312.52 W 5974391.34 N 366398.62 E 0.00 4930.89
7400.00 59.62 267.99 4407.08 4459.08 185.39 8 5398.73 W 5974389.78 N 366312.38 E 0.00 5010.89 .
7500.00 59.62 267.99 4457.66 4509.66 188.42 8 5484.95 W 5974388.22 N 366226.13 E 0.00 5090.88
7600.00 59.62 267.99 4508.24 4560.24 191.46 8 5571.16 W 5974386.67 N 366139.88 E 0.00 5170.88
7700.00 59.62 267.99 4558.81 4610.81 194.498 5657.37 W 5974385.11 N 366053.64 E 0.00 5250.87
7800.00 59.62 267.99 4609.39 4661.39 197.52 8 5743.59 W 5974383.55 N 365967.39 E 0.00 5330.87
7900.00 59.62 267.99 4659.97 4711.97 200.56 8 5829.80 W 5974381.99 N 365881.15 E 0.00 5410.86
8000.00 59.62 267.99 4710.54 4762.54 203.59 8 5916.01 W 5974380.44 N 365794.90 E 0.00 5490.86
8100.00 59.62 267.99 4761.12 4813.12 206.62 8 6002.23 W 5974378.88 N 365708.66 E 0.00 5570.85
8200.00 59.62 267.99 4811.70 4863.70 209.66 8 6088.44 W 5974377.32 N 365622.41 E 0.00 5650.85
8300.00 59.62 267.99 4862.28 4914.28 212.69 8 6174.66 W 5974375.76 N 365536.17 E 0.00 5730.84
8400.00 59.62 267.99 4912.85 4964.85 215.72 8 6260.87 W 5974374.20 N 365449.92 E 0.00 5810.84
8500.00 59.62 267.99 4963.43 5015.43 218.768 6347.08 W 5974372.65 N 365363.67 E 0.00 5890.83
8600.00 59.62 267.99 5014.01 5066.01 221.79 8 6433.30 W 5974371.09 N 365277.43 E 0.00 5970.83
8700.00 59.62 267.99 5064.58 5116.58 224.82 8 6519.51 W 5974369.53 N 365191.18E 0.00 6050.82
8800.00 59.62 267.99 5115.16 5167.16 227.868 6605.72 W 5974367.97 N 365104.94 E 0.00 6130.82
8900.00 59.62 267.99 5165.74 5217.74 230.898 6691.94 W 5974366.42 N 365018.69 E 0.00 6210.81
9000.00 59.62 267.99 5216.32 5268.32 233.92 8 6778.15 W 5974364.86 N 364932.45 E 0.00 6290.81
9034.97 59.62 267.99 5234.00 5286.00 234.98 8 6808.30 W 5974364.31 N 364902.29 E 0.00 6318.78 ALBIAN 97
9100.00 59.62 267.99 5266.89 5318.89 236.96 8 6864.36 W 5974363.30 N 364846.20 E 0.00 6370.80
9200.00 59.62 267.99 5317.47 5369.47 239.99 8 6950.58 W 5974361.74 N 364759.96 E 0.00 6450.80
9300.00 59.62 267.99 5368.05 5420.05 243.02 8 7036.79 W 5974360.19 N 364673.71 E 0.00 6530.79
9400.00 59.62 267.99 5418.62 5470.62 246.06 8 7123.00 W 5974358.63 N 364587.46 E 0.00 6610.79
9500.00 59.62 267.99 5469.20 5521.20 249.09 8 7209.22 W 5974357.07 N 364501.22 E 0.00 6690.78
9600.00 59.62 267.99 5519.78 5571.78 252.128 7295.43 W 5974355.51 N 364414.97 E 0.00 6770.78
9700.00 59.62 267.99 5570.36 5622.36 255.168 7381.64 W 5974353.95 N 364328.73 E 0.00 6850.77
9800.00 59.62 267.99 5620.93 5672.93 258.198 7467.86 W 5974352.40 N 364242.48 E 0.00 6930.77
9900.00 59.62 267.99 5671.51 5723.51 261.22 8 7554.07 W 5974350.84 N 364156.24 E 0.00 7010.76
10000.00 59.62 267.99 5722.09 5774.09 264.268 7640.28 W 5974349.28 N 364069.99 E 0.00 7090.76
10100.00 59.62 267.99 5772.66 5824.66 267.29 8 7726.50 W 5974347.72 N 363983.75 E 0.00 7170.75
10200.00 59.62 267.99 5823.24 5875.24 270.32 8 7812.71 W 5974346.17 N 363897.50 E 0.00 7250.75
10300.00 59.62 267.99 5873.82 5925.82 273.36 8 7898.92 W 5974344.61 N 363811.26 E 0.00 7330.74
10337.93 59.62 267.99 5893.00 5945.00 274.51 8 7931.62 W 5974344.02 N 363778.54 E 0.00 7361.08 ALBIAN 96 .
10400.00 59.62 267.99 5924.39 5976.39 276.39 8 7985.14 W 5974343.05 N 363725.01 E 0.00 7410.74
10500.00 59.62 267.99 5974.97 6026.97 279.42 8 8071.35 W 5974341.49 N 363638.76 E 0.00 7490.73
'10600.00 59.62 261.99-- 6025.55 6077.55 282.46 $ 8157.56 W .. 5974339.94 N 363552:52 E 0.00 7570.73
(0 10700.00 59.62 267.99 6076.13 6128.13 285.49 8 8243.78 W 5974338.38 N 363466.27 E 0.00 7650.72
10800.00 59.62 267.99 6126.70 6178.70 288.52 8 8329.99 W 5974336.82 N 363380.03 E 0.00 7730.72
;0 10900.00 59.62 267.99 6177.28 6229.28 291.56 8 8416.20 W 5974335.26 N 363293.78 E 0.00 7810.71
11000.00 59.62 267.99 6227.86 6279.86 294.59 8 8502.42 W 5974333.70 N 363207.54 E 0.00 7890.71
~ 11100.00 59.62 267.99 6278.43 6330.43 297.628 8588.63 W 5974332.15 N 363121.29 E 0.00 7970.70
ø 11200.00 59.62 267.99 6329.01 6381.01 300.66 8 8674.84 W 5974330.59 N 363035.05 E 0.00 8050.70
11300.00 59.62 267.99 6379.59 6431.59 303.69 8 8761.06 W 5974329.03 N 362948.80 E 0.00 8130.69
t!"~ 11400.00 59.62 267.99 6430.17 6482.17 306.72 8 8847.27 W 5974327.47 N 362862.55 E 0.00 8210.69
Z 11500.00 59.62 267.99 6480.74 6532.74 309.76 8 8933.48 W 5974325.92 N 362776.31 E 0.00 8290.68
11600.00 59.62 267.99 6531 .32 6583.32 312.798 9019.70 W 5974324.36 N 362690.06 E 0.00 8370.68
» 11700.00 59.62 267.99 6581 .90 6633.90 315.828 9105.91 W 5974322.80 N 362603.82 E 0.00 8450.67
11800.00 59.62 267.99 6632.47 6684.47 318.858 9192.13 W 5974321.24 N 362517.57 E 0.00 8530.67
r- 11900.00 59.62 267.99 6683.05 6735.05 321.898 9278.34 W 5974319.69 N 362431.33 E 0.00 8610.66
12000.00 59.62 267.99 6733.63 6785.63 324.92 8 9364.55 W 5974318.13 N 362345.08 E 0.00 8690.66
12100.00 59.62 267.99 6784.21 6836.21 327.95 8 9450.77 W 5974316.57 N 362258.84 E 0.00 8770.65
12159.78 59.62 267.99 6814.44 6866.44 329.77 8 9502.30 W 5974315.64 N 362207.28 E 0.00 8818.47 Begin Dir ~6866.440'TVD
12200.00 60.03 269.79 6834.66 6886.66 330.44 8 9537.06 W 5974315.56 N 362172.51 E 4.00 8850.91
12285.98 60.99 273.58 6877.00 6929.00 328.24 8 9611.85 W 5974319.05 N 362097.79 E 4.00 8921.95 TOP HRZ
12300.00 61.15 274.19 6883.78 6935.78 327.40 8 9624.09 W 5974320.09 N 362085.56 E 4.00 8933.74
12400.00 62.42 278.50 6931.08 6983.08 317.658 9711.63 W 5974331.34 N 361998.20 E 4.00 9019.36 .
12500.00 63.81 282.70 6976.32 7028.32 301.23 8 9799.27 W 5974349.25 N 361910.87 E 4.00 9107.33
12600.00 65.32 286.80 7019.28 7071.28 278.22 8 9886.56 W 5974373.75 N 361823.99 E 4.00 9197.24
12640.54 65.97 288.44 7036.00 7088.00 267.03 8 9921.76 W 5974385.53 N 361788.99 E 4.00 9234.14 BA8E HRZ
12700.00 66.94 290.80 7059.75 7111.75 248.73 8 9973.10 W 5974404.71 N 361737.98 E 4.00 9288.64
12755.31 67.88 292.97 7081.00 7133.00 229.69 8 10020.48 W 5974424.56 N 361690.93 E 4.00 9339.68 K-1 MARKER
12800.00 68.66 294.70 7097.54 7149.54 212.91 8 10058.45 W 5974441.98 N 361653.26 E 4.00 9381.09
12872.04 69.96 297.46 7123.00 7175.00 183.288 10118.97 W 5974472.64 N 361593.26 E 4.00 9448.09 TOP KUPARUK
12900.00 70.47 298.51 7132.46 7184.47 170.94 8 10142.20 W 5974485.38 N 361570.24 E 4.00 9474.14
13000.00 72.36 302.23 7164.35 7216.35 123.01 8 10223.95 W 5974534.70 N 361489.33 E 4.00 9567.34
13018.84 72.72 302.93 7170.00 7222.00 113.338 10239.09 W 5974544.63 N 361474.36 E 4.00 9584.88 LCU
13100.00 74.31 305.88 7193.04 7245.04 69.36 8 10303.29 W 5974589.69 N 361410.93 E 4.00 9660.23
13126.18 74.83 306.82 7200.00 7252.00 54.418 10323.61 W 5974604.99 N 361390.87 E 4.00 9684.44 CD2-31 (Toe)
13200.00 76.32 309.45 7218.39 7270.39 10.268 10379.84 W 5974650.09 N 361335.41 E 4.00 9752.36
13211.13 76.55 309.85 7221.00 7273.00 3.368 10388.17 W 5974657.13 N 361327.20 E 4.00 9762.55 MILUVEACH A
13288.74 78.15 312.57 7238.00 7290.00 46.54 N 10445.13 W 5974707.99 N 361271.11 E 4.00 9833.12 ALPINE 0
13300.00 78.39 312.96 7240.29 7292.29 54.02 N 10453.22 W 5974715.61 N 361263.14 E 4.00 9843.28
13367.16 79.80 315.29 7253.00 7305.00 99.93 N 10500.55 W 5974762.32 N 361216.61 E 4.00 9903.44 ALPINE C
13400.00 80.49 316.42 7258.62 7310.62 123.15 N 10523.08 W 5974785.92 N 361194.48 E 4.00 9932.55
13440.41 81.35 317.81 7265.00 7317.00 152.39 N 10550.24 W 5974815.62 N 361167.83 E 4.00 9968.06 UJU
13500.00 82.63 319.84 7273.30 7325.30 196.81 N 10589.08 W 5974860.68 N 361129.76 E 4.00 10019.74
13600.00 84.79 323.23 7284.26 7336.26 274.62 N 10650.89 W 5974939.54 N 361069.29 E 4.00 10104.41
13700.00 86.98 326.59 7291.44 7343.44 356.22 N 10708.22 W 5975022.09 N 361013.37 E 4.00 10186.15
13737.00 87.79 327.83 7293.13 7345.13 387.29 N 10728.24 W 5975053.50 N 360993.89 E 4.00 10215.587" Csg Pt... 7345' TVD - 7" @ 137
13800.00 89.17 329.94 7294.80 7346.80 441.20 N 10760.78 W 5975107.95 N 360962.28 E 4.00 10264.57
13857.89 90.44 331.87 7295.00 7347.00 491.77 N 10788.93 W 5975159.00 N 360935.00 E 4.00 10308.30 Target Hee 7347' TVD (1391 FNL
13900.00 90.44 331.87 7294.68 7346.68 528.91 N 10808.79 W 5975196.47 N 360915.79 E 0.00 10339.64
14000.00 90.44 331.87 7293.91 7345.91 617.10 N 10855.93 W 5975285.44 N 360870.16 E 0.00 10414.07
14100.00 90.44 331.87 7293.14 7345.14 705.28 N 10903.08 W 5975374.41 N 360824.53 E 0.00 10488.50
14200.00 90.44 331.87 7292.38 7344.38 793.47 N 10950.22 W 5975463.39 N 360778.91 E 0.00 10562.92
14300.00 90.44 331.87 7291.61 7343.61 881.65 N 10997.37 W 5975552.36 N 360733.28 E 0.00 10637.35
14400.00 90.44 331.87 7290.84 7342.84 969.84 N 11044.51 W 5975641 .33 N 360687.65 E 0.00 10711.77 .
14500.00 90.44 331.87 7290.08 7342.08 1058.03 N 11091.66 W 5975730.30 N 360642.03 E 0.00 10786.20
14600.00 90.44 331.87 7289.31 7341.31 1146.21 N 11138.81 W 5975819.27 N 360596.40 E 0.00 10860.63
14700.00 90.44 331.87 7288.54 7340.54 1234.40 N 11185.95 W 5975908.25 N 360550.78 E 0.00 10935.05
C.:> 14800.00 90.44 331.87 7287.77 7339.77 1322.58 N 11233.10 W 5975997.22 N 360505.15 E 0.00 11009.48
14900.00 90.44 331.87 7287.01 7339.01 1410.77 N 11280.24 W 5976086.19 N 360459.52 E 0.00 11083.90
:;0 15000.00 90.44 331.87 7286.24 7338.24 1498.95 N 11327.39 W 5976175.16 N 360413.90 E 0.00 11158.33
15100.00 90.44 331.87 7285.47 7337.47 1587.14 N 11374.53 W 5976264.13 N 360368.27 E 0.00 11232.75
15200.00 90.44 331.87 7284.71 7336.71 1675.32 N 11421.68 W 5976353.11 N 360322.65 E 0.00 11307.18
~~;) 15300.00 90.44 331.87 7283.94 7335.94 1763.51 N 11468.82 W 5976442.08 N 360277.02 E 0.00 11381.61
~'
",j¡ . 15400.00 90.44 331.87 7283.17 7335.17 1851.70 N 11515.97W 5976531.05 N 360231.39 E 0.00 11456.03
15500.00 90.44 331.87 7282.41 7334.41 1939.88 N 11563.12 W 5976620.02 N 360185.77 E 0.00 11530.46
'~;.? 15600.00 90.44 331.87 7281.64 7333.64 2028.07 N 11610.26 W 5976708.99 N 360140.14 E 0.00 11604.88
<~.-
::1> 15700.00 90.44 331.87 7280.87 7332.87 2116.25 N 11657.41 W 5976797.97 N 360094.52 E 0.00 11679.31
15800.00 90.44 331.87 7280.10 7332.10 2204.44 N 11704.55 W 5976886.94 N 360048.89 E 0.00 11753.74
~~ 15900.00 90.44 331.87 7279.34 7331.34 2292.62 N 11751.70 W 5976975.91 N 360003.26 E 0.00 11828.16
g 16000.00 90.44 331.87 7278.57 7330.57 2380.81 N 11798.84 W 5977064.88 N 359957.64 E 0.00 11902.59
16100.00 90.44 331.87 7277.80 7329.80 2469.00 N 11845.99 W 5977153.85 N 359912.01 E 0.00 11977.01
16200.00 90.44 331.87 7277.04 7329.04 2557.18 N 11893.13 W 5977242.83 N 359866.38 E 0.00 12051.44
16300.00 90.44 331.87 7276.27 7328.27 2645.37 N 11940.28 W 5977331.80 N 359820.76 E 0.00 12125.86
16400.00 90.44 331.87 7275.50 7327.50 2733.55 N 11987.43 W 5977420.77 N 359775.13 E 0.00 12200.29
16500.00 90.44 331.87 7274.74 7326.74 2821.74 N 12034.57 W 5977509.74 N 359729.51 E 0.00 12274.72
16600.00 90.44 331.87 7273.97 7325.97 2909.92 N 12081.72 W 5977598.71 N 359683.88 E 0.00 12349.14
16700.00 90.44 331.87 7273.20 7325.20 2998.11 N 12128.86 W 5977687.68 N 359638.25 E 0.00 12423.57 .
16800.00 90.44 331.87 7272.43 7324.43 3086.30 N 12176.01 W 5977776.66 N 359592.63 E 0.00 12497.99
16900.00 90.44 331.87 7271.67 7323.67 3174.48 N 12223.15 W 5977865.63 N 359547.00 E 0.00 12572.42
17000.00 90.44 331.87 7270.90 7322.90 3262.67 N 12270.30 W 5977954.60 N 359501.38 E 0.00 12646.84
17100.00 90.44 331.87 7270.13 7322.13 3350.85 N 12317.44 W 5978043.57 N 359455.75 E 0.00 12721 .27
17200.00 90.44 331.87 7269.37 7321.37 3439.04 N 12364.59 W 5978132.54 N 359410.12 E 0.00 12795.70
17300.00 90.44 331.87 7268.60 7320.60 3527.22 N 12411.74 W 5978221.52 N 359364.50 E 0.00 12870.12
17400.00 90.44 331.87 7267.83 7319.83 3615.41 N 12458.88 W 5978310.49 N 359318.87 E 0.00 12944.55
17500.00 90.44 331.87 7267.07 7319.07 3703.59 N 12506.03 W 5978399.46 N 359273.25 E 0.00 13018.97
17600.00 90.44 331.87 7266.30 7318.30 3791.78 N 12553.17 W 5978488.43 N 359227.62 E 0.00 13093.40
17700.00 90.44 331.87 7265.53 7317.53 3879.97 N 12600.32 W 5978577.40 N 359181.99 E 0.00 13167.83
17800.00 90.44 331.87 7264.76 7316.76 3968.15 N 12647.46 W 5978666.38 N 359136.37 E 0.00 13242.25
17900.00 90.44 331.87 7264.00 7316.00 4056.34 N 12694.61 W 5978755.35 N 359090.74 E 0.00 13316.68
18000.00 90.44 331.87 7263.23 7315.23 4144.52 N 12741.75 W 5978844.32 N 359045.12 E 0.00 13391.10
18100.00 90.44 331.87 7262.46 7314.46 4232.71 N 12788.90 W 5978933.29 N 358999.49 E 0.00 13465.53
18200.00 90.44 331.87 7261.70 7313.70 4320.89 N 12836.05 W 5979022.26 N 358953.86 E 0.00 13539.95
18300.00 90.44 331.87 7260.93 7312.93 4409.08 N 12883.19 W 5979111.24 N 358908.24 E 0.00 13614.38
-- ".
'~
4~J
','''T.".'iÐ.~)
l'~~~~)
\\_ ß
f,~"·.'t:"'.;Qft<mJ>.
0.,'7'
~-
):>
r
18400.00
18500.00
18600.00
18681.88
90.44
90.44
90.44
90.44
331.87
331.87
331.87
331.87
7260.16
7259.40
7258.63
7258.00
7312.16
7311.40
7310.63
7310.00
4497.27 N
4585.45 N
4673.64 N
4745.84 N
12930.34 W
12977.48 W
13024.63 W
13063.23 W
5979200.21 N
5979289.18 N
5979378.15 N
5979451.00 N
358862.61 E
358816.98 E
358771.36 E
358734.00 E
0.00 13688.81
0.00 13763.23
0.00 13837.66
0.00 13898.60 TargetToe 7310'TVD: Sec33-T1:
.
.
ConocoPhillips Alaska, Inc..
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
· V
ConocoPhillips
May 13, 2004
Alaska Oil and Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill
CD2-31
RECEIVED
MAY 1 4 2004
Alaska Oil & Gas Gons Com . .
. miSSIOn
Anchorage
Dear Sir or Madam:
Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from
the Alpine CD2 drilling pad. The intended spud date for this well is June 5, 2004. It is
intended that Doyon Rig 19 drill the well.
The pilot hole well, CD2-31 PB1 will be drilled through the Alpine C sand at +/-60°
inclination for logging and evaluation purposes. The well will be plugged back above the
HRZ with cement. The well CD2-31 will then be drilled off the cement plug and landed
in the Alpine sand horizontally. 7" casing will then be run and cemented in place. The
horizontal section will be drilled with oil based mud using mineral oil as the base fluid.
CD2-31 will be completed as producer with a perforated liner. At the end of the work
program the well will be shut in awaiting surface connection.
Note that it is planned to drill the surface hole without a diverter. There have been 41
wells drilled on CD1 pad and 45 wells drilled on CD2 pad with no significant indication of
gas or shallow gas hydrates.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program
4. A drilling fluids program summary.
5. Proposed pilot hole plug back diagram.
6. Proposed completion diagram.
7. Pressure information as required by 20 ACC 25.035 (d)(2).
8. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser setup which replaces diverter
ORIGINAL
\.
.
If you have any questions or require further information, please contact Vern Johnson at
265-6081 or Chip Alvord at 265-6120.
~~I? ) ¡; 7 ky
~ohnson
Drilling Engineer
Attachments
cc:
CD2-31 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson
Cliff Crabtree
Steve Moothart/Jeff Yeaton
Nancy Lambert
Lanston Chin
e-mail:
ATO 1530
ATO 1700
ATO 1702
ATO 1768
A TO 1756/1752
Anadarko - Houston
Kuukpik Corporation
Tommy_Thompson @anadarko.com
RECEIVED
MAY 14 2004
C mmissíon
ì! & Gas Cons. 0
Alaska 0" Anchorage
.
SHARON K. ALLSUP-DRAKE 1054
CONOCOPHILLlPS
~~~~ET ""'~"'-, æJ04- 62-"~,,
ANOH""GE AK 9950, ~
;~~i~J:!' Ç1í11 E tJr U'/s 1':1'1 IÎQ:7c- $ /à;J 00
~~cL(¡.£,/,,-- ~'~"A.S 6J
,a.. CHASE Chose ManltO"on Bank USA, N.A. Valid Up To 5000 DOllars
' 200 White C¡ay Center Dr., Newark, D£19711
... - , -
~~~ 40/· -- ~L
.""'- -- ---.---- --- ----. ------- ----- -_n_ _
': 0 3 · · DOH ~ ': i' . B ~ ? . '10 ? 'I i' ?¡; 1/' .0 5 ~
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME CRt{, (!])z -3/ ~ 3/f)!-
PTD# 2Dc/-ó82-
/ Development
Service
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API num ber
last two (2) digits
are between 60-69)
Exploration
Stratigraphic
"CLUE"
The permit is for a new weJJbore segment of
existing well ,
Permit No, API No. .
Production. should continue to be reported as
a function 'of the original API number. stated
above.
/
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
bole must be clearly differentiated In both
name (name on permit plus PH) B::).
¿D2.'?JI{?lIand API number (50'IOÓ"'2D4r/3-7ö
70/80) from records, data and logs acquired
for we)) (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
"".
DRY DITCH
SAMPLE
The permit is approved subject ·to fun
compliance with 20 AAC 25.0SS~ Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing e:xception.
(Company Name) assumes the liability of any
protest to tbe spacing . exception that may
occur.
AlJ dry ditcb sample sets submitted to the
Commission must be in no greater than 30'
sample inten'als from below tbe permafrost
or from where samples are first caught and
10' sample intervals througb target zones.
Field & Pool COLVILLE RIVER, ALPINE OIL -120100 Well Name: COLVILLE RIV UNIT CD2-31 Program DEV __ Well bore seg
PTD#: 2040820 Company CONOCOPHILLlPS ALASKA INC nitial Classrrype DEVIPEND GeoArea 890 Unit 50360 __ On/Off Shore ~_ Annular Disposal D
Administration 1 Pe UTj it fee attache~_ - - - - Yes_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 _Lease number _approwiate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No _ _ Surtace LOcÇItion jn_ ADL 380015; wellpaS5- t/1(ough ADL_ 3872Q7; top Of pJQd ilJterval_and TD lie within_an
3 _U_nique welln_ame_and lJumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ Yes__ _ _ _ ASRG leª5-e_(#~I:R1) th<lt is located withjnJbe CQhÔlleRi",er Uoit ",n!:UheAlpineJ:'A. _ _ - - - . . . . . . - - - - - - -
,4 WelUQcated inadefine_d_pOQI _ _ _ _ _ _ _ - - - - - - Yes_ _ _ _ Alpine OiJ PooLC_onseJ'v'atiQn_ QrderNo, 443 _ - - - - - - -
5 WeJUQcated proper _distance from driJling unit boundary_ - - - - Yes _ _ CO .443: ~(ÏII unit .si~e IJQt .specified. butweJls mU5-t Þe > 50Q' from eachoth_er 8. _exleriQrboundªry pf -
6 WeJUocated prpperdistance_ from Qtber wells_ _ - - - - _ _Yes_ _ affected ªreª UstedJn CO 4<13_A.s prop05-ed,_ tbe welln:1E~ets_ tbeseconditioos_. Neares_t offset welL
7 Sutficientacreag.e_aYail<lble indJiUiog unjt _ _ _ _ - - - - - - Yes _ _ is 2.000' NE. Pro_d. inte(\/¡¡L& TD are >sQO' frQm the eJrteriou( bO!Jodary of COA43's ¡¡ffected <lrea.
8 Jfdeviated, js weJlbore pl¡¡tincJuded _ _ _ - - - - - - Y_es _ _ They <I(eaJsp >500' from thee~erior bQundary ofJbe CRU ,uld_ tbe Alpine PA._
9 _Ope(ator only affected p",rty _ _Yes _ _ - - - - - - - - - - - - - - - - - - - - - - - -
10 _Ope(ator b",s_apprppriateJ:!ond inJorce _ . _ _ _ . . _ _ . _ . . . _ .__.____Yes._ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + - - -
11 Permit can be issued witbQut conservation order_ _ _ _ _ _ Yes __ - - - - - - - - - - - - - - - - - - - - - - -
Appr Date 12 Permit can Þe issued witbout administrati",eapprpvaJ _ Yes - - - - - - - - - - - - - - - - - - - - - - - - - -
SFD 5/18/2004 13 Can permit be approved before 15-day wait Yes .
14 WeJIJQc¡¡ted within area and str¡¡ta authorized by_lnjectiolJ Ord_er # (putlO# in_commelJtsUfor NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 .AJI welJs_withinJl4.mile_are_a_of reyiew id_eot[fied (Fp( 5-ervjce.weU only). . _ _ . . . . . . . .NA _. - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - -
116 Pre-produ_ced injector; 9ur<ltionof pre-production less than_:3 montbs (for_se(\/ice well QnJy) NA - - - - - - - - - - - - - - - - - - - - - - - - -
I
17 ACMP F:indjngof Consistency_ has bee_n J5-sued for_ tbis project NA · . WelJ driJled from exisJiog pad
-
Engineering 18 _Cooductor stringpJovided _ - - - - - - Yes_ _ - - - - - - - - - - - - - - - - - - -
19 Su(Íace_c¡¡5-ingpJotecJ5- all known USDWs . NA · .1\10 ¡¡quiferS,pe( AIO 18,11. çonclusion 3._ - - - - - -
20 CMT vol adeQuate_ to circulate o_n _conductor & $urf c.sg _ Yes __ - - - - - - - -
21 CMT v_ol adeQuate_ to tie-inJong _string tos!J(Í csg_ No · _ Annular disp9sal m_ay be prpposed. . - - - - --
22 CMTwill coyer_aJl known-Pfo_ductive bQri~Qns . No_ · . Open_h_ole completion planne_d._ - - - - -
123 Casing de_signs adequa_te fpr C,T, B_&_ permafrost. _ Yes_ - - - - - - - - - - - -
24 A~equatetan_k¡¡geor reserve pit. - - - - - - - Yes_ . · . Rig iSßquippedwith $teelpjts. No reser\le_pjtplanlJed, Waste to ¡¡n approved anMIU$..
25 JtaJe-drilt has_a_ to-403 for abandonment beeo ¡¡PPJQved _ NA - - - - - - - - - - - - - - - - - - - - - - - - - -
26 _Mequ<ltewe!ll:¡ore separ¡¡tjo.n_proP95-ed _ _ . _ . . . . . . _ _ . _ . _ _ _ . Yes. . _ . _ !?rpximity an<llysi$ perfwme.d, Jrayeling cylinder patb calc;uJate_d, GyrO$ pos.si.ble. _ _ _ . _ . . . . _ _ - . . - _ _ - -
27 Jfdivecter required, doe$ it meet reguJations_ _ . - - - - NA _ _ _ Diverter wai",er has !:¡eeo given o_n _c.D-2 pa_d, _ - - - - - - - - - - - - - - - - - - -
Appr Date 28 _DriUilJg fluid prog.ram schem¡¡tic_& e(tuip Jistadequate_ - - - - - - - - Yes __ _ _ . Maximum expected fo(maJion pre5-sure8J_ EMW. MW planned 9.6 - 9.8ppg in 8-1/2" hole. 8.1 - 8.8 ppg in sand.
TEM 5/1812004 129 BOPEs,_ d_o they meet reguJation . - - - - -- - - - - - - Yes. . - - - - - - - - - - - - - - - -- -
~ 1l~ '¡3D _BOPEpress raJilJg appropriate; test to_(put psig in_comments) Yes. _ · . MAS!? calcuJated_at 2561 psi. 3SQOp~iappr9prjate. CPN usually te_ststQ SQOO psi._ _ - - - - - - - - -
31 Choke manifold cQmpJie5- w/API RI:-s3. (May 84)_ . - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
32 Work will PcCU( withoytoperatjon _shutdown_ _ _ _ _ - - - - - - - Yes __ - - - - - - - - - - - - - - - - - - -
33 J5- pres.ence Qf H2S gas probable _ _ - - - - - - - - - - No_ __ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
34 MeçbanicaLC9ndíUon p{ we.lls within AOR verified (For s_e(\/jce welJ onJy) NA - - - - - - - - - - - - - - - - -
-
Geology i35 Permit c.ao be issued w/o hyd(ogen_ sulfide meas_ures Yes __ - - - - - - - - - - - - - - - - - -
136 _D_ata_preselJted Qn pote_ntial oveJPres_sure _zones_ Yes · . Expected reservoir pre_ssure i.s8,7ppg EMW; will be _drilled witb 8.8 ppg myd. .
Appr Date 37 Seismic_analysis Qf sbaJlow gas_zolJes . NA - - - - - - - - - - -
SFD 5/17/2004 138 Se¡¡l:¡ed _condjtjpo survey -(if off-shpre) NA
- - - - - - - - - - -
39 _ Contact namelphoneJor_weekly progre$sreports [1 NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-
Geologic Date: Engineering Date Proposal includes a pilot hole that will be drilled, plugged back, and then the well will be sidetracked as a horizontal
Commissioner: Commissioner:
DTS Jf J ctY /1- production well.
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, infonnation of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
.
2o'f - 03 ¿
)2&8'S-
Sperry-Sun Drilling Services
LIS Scan Utility
RECEIVED
$Revision: 3 $
LisLib $Revision: 4 $
Tue Sep 14 09:21:01 2004
{"'·r'"' ~~ í) A"~4
,')~-...~_J/ r' jlll!
'-,-, ..... U Llv
A'ð.ska Oil &: Gas Cons. Commission
Anchorage
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/09/14
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.... . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/09/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Coville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD2-31 PB1
501032049370
ConocoPhillips Alaska, Inc.
Sperry Sun
23-AUG-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0003109992
R. KRELL
D. BURLEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
llN
4E
1875
1526
.00
52.84
15.90
#
WELL CASING RECORD
1ST STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 3302.0
.
.
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) REFERENCED TO
BIT, UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED.
4. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR),
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL
NEUTRON POROSITY (CTN)
WITH INTEGRAL ACOUSTIC CALIPER (ACAL), AND AZIMUTHAL
STABILIZED LITHO-
DENSITY (ASLD).
5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE
LOGGING
REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26
SEPTEMBER 2001.
6. MWD RUN 2 REPRESENTS WELL CD2-31 PB1 WITH API#
50-103-20493-70.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 13245'MD,
7429'TVD.
CALA
ADBQ
ADTQ
ADLQ
ADRQ
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING
SGRC SMOOTHED GAMMA RAY COMBINED
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING)
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY)
TNPS = SMOOTHED COMPENSATED THERMAL NEUTRON POROSITY -
SANDSTONE LITHOLOGY
CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE
(NEUTRON)
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE
(NEUTRON)
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW
COUNT-RATE BIN)
SC02 = SMOOTHED STANDOFF CORRECTION (LOW COUNT-RATE
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW COUNT-RATE BIN)
SMOOTHED ACOUSTIC CALIPER
AZIMUTHAL DENSITY - BOTTOM QUADRANT DATA
AZIMUTHAL DENSITY - TOP QUADRANT DATA
AZIMUTHAL DENSITY - LEFT QUADRANT DATA
AZIMUTHAL DENSITY - RIGHT QUADRANT DATA
PARAMETERS USED IN POROSITY LOG CALCULATIONS:
· .
HOLE SIZE: ACAL - VARIABLE
MUD WEIGHT: 9.6-9.8 PPG
MUD SALINITY: 300 PPM CHLORIDES
FORMATION WATER SALINITY: 25000 PPM CHLORIDES
FLUID DENSITY: 1.0 G/GG
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/09/14
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
CALA
FET
GR
PEF
DRHO
RHOB
RH04
RH02
RH01
FCNT
NCNT
NPHI
RPD
RPM
RPS
RPX
RHO 3
ROP
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
3250.0
3267.0
3274.5
3288.5
3288.5
3288.5
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3312.5
STOP DEPTH
13145.5
13199.0
13207.0
13161. 5
13161. 5
13161.5
13161.5
13161.5
13161.5
13148.0
13148.0
13148.0
13199.0
13199.0
13199.0
13199.0
13161.5
13245.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------.
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
#
REMARKS:
BIT RUN NO MERGE TOP
2 3250.0
MERGE BASE
13245.0
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type........... .......0
.
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units........ ...Feet
Data Reference Point........... ...Undefined
Frame Spacing................ .... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999.25
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
CALA
RH01
RH02
RH03
RH04
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
CALA
RH01
RH02
RH03
RH04
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
PU-S
CNTS
CNTS
G/CM
G/CM
B/E
IN
G/CM
G/CM
G/CM
G/CM
Units
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
PU-S
CNTS
CNTS
G/CM
G/CM
B/E
IN
G/CM
G/CM
G/CM
G/CM
Size
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Nsam
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Rep
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
Code
Offset
o
4
8
12
16
20
24
28
32
36
40
44
48
52
56
60
64
68
72
Min
3250
5
43.82
0.58
0.07
0.14
0.09
0.16
8.4
487
100564
0.568
-2.285
2.03
8.45
1. 322
1.313
0.971
1.392
Max
13245
466
401.18
1489.81
1499.94
2000
2000
51.78
65.15
4548
201311
3.082
0.222
13 .47
10.21
3.089
3.03
2.974
2.994
Mean
8247.5
201.775
114.622
5.82583
5.8331
6.06316
8.19053
0.635673
33.0811
1065.99
134296
2.41749
0.0507752
3.3255
9.17693
2.41542
2.37747
2.40899
2.39961
First Reading For Entire File... ...... .3250
Last Reading For Entire File...... .... .13245
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Channel
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Nsam
19991
19866
19866
19821
19821
19821
19821
19865
19719
19719
19719
19747
19747
19747
18899
19746
19746
19746
19746
.
First
Reading
3250
3312.5
3274.5
3289
3289
3289
3289
3267
3289
3289
3289
3288.5
3288.5
3288.5
3250
3289
3289
3289
3289
Last
Reading
13245
13245
13207
13199
13199
13199
13199
13199
13148
13148
13148
13161.5
13161.5
13161.5
13145.5
13161. 5
13161.5
13161.5
13161.5
.
Date of Generation...... .04/09/14
Maximum Physical Record. .65535
Fi1e Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name. ........... .STSLIB.002
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .04/09/14
Maximum Physical Record. .65535
File Type....... . . . . . . . . .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
CALA
FET
GR
PEF
RHOB
DRHO
RH04
RH03
RH02
RHO 1
FCNT
NCNT
NPHI
RPD
RPM
RPS
RPX
ROP
$
2
.
header data for each bit run in separate files.
2
.5000
START DEPTH
3250.0
3267.0
3274.5
3288.5
3288.5
3288.5
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3289.0
3312.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
STOP DEPTH
13145.5
13199.0
13207.0
13161.5
13161.5
13161.5
13161.5
13161.5
13161.5
13161.5
13148.0
13148.0
13148.0
13199.0
13199.0
13199.0
13199.0
13245.0
12-JUN-04
Insite
0.43
Memory
13245.0
3250.0
13245.0
56.1
63.8
TOOL NUMBER
.
DGR
EWR4
CTN
ASLD
$
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMP THERMAL NEUTRON
AZIMUTHAL LITHO-DENS
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Da ta Record Type. . . . . . . . . . . . . . . . . . 0
Data Specification Block Type... ..0
Logging Direction....... ........ ..Down
Optical log depth units. . . . . . . . . . .Feet
Data Reference Point............ ..Undefined
Frame Spacing........... ......... .60 .1IN
Max frames per record........... ..Undefined
Absent value.................... ..-999.25
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
124725
151812
185457
105075
8.500
3302.0
LSND
9.70
36.0
9.3
250
7.0
5.000
2.561
5.200
4.000
72.0
147.0
7.2
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
NPHI MWD020 PU-S 4 1 68 32 9
FCNT MWD020 CNTS 4 1 68 36 10
NCNT MWD020 CNTS 4 1 68 40 11
RHOB MWD020 G/CM 4 1 68 44 12
DRHO MWD020 G/CM 4 1 68 48 13
PEF MWD020 B/E 4 1 68 52 14
CALA MWD020 IN 4 1 68 56 15
RH01 MWD020 G/CM 4 1 68 60 16
RH02 MWD020 G/CM 4 1 68 64 17
. .
RH03 MWD020 G/CM 4 1 68 68 18
RH04 MWD020 G/CM 4 1 68 72 19
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3250 13245 8247.5 19991 3250 13245
ROP MWD020 FT/H 5 466 201.775 19866 3312.5 13245
GR MWD020 API 43.82 401.18 114.622 19866 3274.5 13207
RPX MWD020 OHMM 0.58 1489.81 5.82583 19821 3289 13199
RPS MWD020 OHMM 0.07 1499.94 5.8331 19821 3289 13199
RPM MWD020 OHMM 0.14 2000 6.06316 19821 3289 13199
RPD MWD020 OHMM 0.09 2000 8.19053 19821 3289 13199
FET MWD020 HOUR 0.16 51.78 0.635673 19865 3267 13199
NPHI MWD020 PU-S 8.4 65.15 33.0811 19719 3289 13148
FCNT MWD020 CNTS 487 4548 1065.99 19719 3289 13148
NCNT MWD020 CNTS 100564 201311 134296 19719 3289 13148
RHOB MWD020 G/CM 0.568 3.082 2.41749 19747 3288.5 13161.5
DRHO MWD020 G/CM -2.285 0.222 0.0507752 19747 3288.5 13161.5
PEF MWD020 B/E 2.03 13 .47 3.3255 19747 3288.5 13161.5
CALA MWD020 IN 8.45 10.21 9.17693 18899 3250 13145.5
RHOl MWD020 G/CM 1. 322 3.089 2.41542 19746 3289 13161.5
RH02 MWD020 G/CM 1.313 3.03 2.37747 19746 3289 13161.5
RH03 MWD020 G/CM 0.971 2.974 2.40899 19746 3289 13161. 5
RH04 MWD020 G/CM 1. 392 2.994 2.39961 19746 3289 13161.5
First Reading For Entire File..... .... .3250
Last Reading For Entire File.......... .13245
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..04/09/14
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
Tape Trailer
Service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/09/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/09/14
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.... . . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
.
.
Physical EOF
Physical EOF
End Of LIS File