Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-082 STATE OF ALASKA A OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other:Scale Inhibitor Treatment D 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development 0 Exploratory Cl 204-082 3.Address: Stratigraphic❑ Service ❑ 6.API Number: P.O. Box 100360, Anchorage, AK 99510 50-103-20493-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 380075, 387207 CRU CD2-31 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): None Colville River Field/Alpine Oil Pool 11. Present Well Condition Summary: Total Depth measured 18131 feet Plugs measured None feet true vertical 7311 feet Junk measured None feet Effective Depth measured 18131 feet Packer measured 12629 feet true vertical 7311 feet true vertical 7071 feet Casing Length Size MD TVD SCAl��tt�t1 'ER 2 2017 Collapse Structural ! i1l�aBB��CC��d i1 [ CC�a 7 1 Conductor 81' 16" 114' 114' Surface 3265' 9.625" 3302' 2364' Intermediate Production 13564' 7" 13598' 7340' RECEIVED Liner 5490' 4.5" 18119' 7312' OCT 21 2016 Perforation depth Measured Depth: Slotted Liner Completion, 12629'- 18119' True Vertical Depth: 7071'-7312' AOGCC Tubing(size,grade,measured and true vertical depth) 4.5"x 3.5", L-80, 12679' MD, 7093'TVD Packers and SSSV(type,measured and true vertical depth) Packer: Baker ZXP Liner Top Packer, 12629' MD, 7071'TVD SSSV: Camco TRM-4E SCSSV, 2307' MD, 1878'TVD 12.Stimulation or cement squeeze summary: Intervals treated(measured): 13598'- 18131' MD Treatment descriptions including volumes used and final pressure: Please see attached summary 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 399 166 772 1186 213 Subsequent to operation: 404 99 795 1168 207 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations D Exploratory❑ Development0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil LI Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP❑ SPLUG❑ _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Anu Sood Email Anu.Sood@cop.com Printed Name Anu Sood Title Production Engineer Signature .......4:10' Phone 263-4802 Date t(4,24)6 V t- bo/zf//L ^Of Y/i6 RBDMS 1,v OCT 2 4 2016 Form 10-404 Revised 5/2015 Submit Original Only • ! CD2-31 Scale Inhibition Treatment 9/22/16 Hybrid Scale Inhibitor Squeeze Job pumped from 07:45 to 17:15 hrs on 9/22/16. LRS= Little Red Services - Initial pressure TBG/IA/OA=801/1011/852 - LRS pumped 165 bbls Diesel/WAW5206/M209 preflush at 1-2.5 bpm,TBG/IA/OA= 2/1031/814 - LRS pumped 165 bbls Seawater/SCW3001 scale inhibitor main treatment at 2.5 bpm,TBG/IA/OA = 6/1002/771 - LRS pumped 1781 bbls dead crude overflush at 3.5 -4 bpm,TBG/IA/OA=0/986/757 Interval treated (MD): 13598'—18131' y. ,; WNS • CD2-31 ConocoP Ii lips " Well Attributes Max Angle&MD TD Alaska,Inc. "� Wellbore API/UWI Field Name Well Status Incl(-) MD(ftKB) Act Btm(RKB) canocaafemp: - 501032049300 ALPINE PROD 94.22 13,885.24 18,131.0 Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date ••• Well C0009.-CD291,4/11120137:16'02AM SSSV:TRDP Last WO: 44.05 7/2/2004 Schematic-Actual Annotation Depth(ROB) End Date Annotation Last Mod...End Date Last Tag: Rev Reason:WELL REVIEW osborl 4/11/2013 Casing Strings 5_ / Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt..String...String Top Thrd HANGER,33 A CONDUCTOR 16 15.062 33.0 114.0 114.0 62.50 H-40 WELDED R ` ' Casing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt..String...String Top Thrd SURFACE 95/8 8.92136.7 3,301.9 2,363.7 36.00 J-55 BTC • '�£ Cuing Description String 0... String ID.._Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd PRODUCTION 7 6.276 34.8 13,598.4 7,339.5 26.00 L-80 BTCM - Casing Description String 0... String ID...Top)RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd '' ..! LINER 41/2 3.958 12,628.5 18,119.0 7,311.6 12.60 L-80 IBTM IF CONDUCTOR. Liner Details 33-714 Top Depth (TVD) Top Incl Nome... SAFETY VLV, Top(RKB) (RKB) (°) Item Description Comment ID lin) 2,307 Cle7: 111 12,628.5 7,071.4 64.48 PACKER BAKER ZXP LINER TOP PACKER 4.940 12,647.5 7,079.3 64.94 HANGER BAKER FLEX LOCK LINER HANGER 4.853 12,659.3 7,084.3 65.23 SBE BAKER SEAL BORE EXTENSION 4.750 SURFACE ,e Tubing Strings _ 37-3'302 Tubing Description String 0... String ID...Top(RKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top Thrd GAS LIFT, TUBING 4.5x3.5" I 3 1/2 2.992 32.6 12,678.5 7,092.5 9.30 L-80 EUE-MOD 5.384ii Completion Details Top Depth (TVD) Top Incl Nome... Top(RKB) (RKB) (°) Item Description Comment ID(In) GAS LIFT, 1- 32.6 32.6 0.50 HANGER FMC4.5"TUBING HANGER 4.500 9,909 4 r 84.4 84.4 0.39 XO Reducing CROSSOVER 4.5 x 3.5" 3.500 [ -11 2,307.1 1,877.9 60.45 SAFETY VLV CAMCO TRM-4E SCSSV 2.812 12,518.2 7,020.2 61.80 SLEEVE-C BAKER CMPA SLIDING SLEEVE w/2.81"X PROFILE;CLOSED 2.812 GAS LIFT, 7/6/2004 12,430 MI12,596.0 7,057.3 63.69 NIPPLE HES XN NIPPLE w/NO GO 2.75"PROFILE 2.750 12,634.6 7,074.0 64.63 LOCATOR LOCATOR SUB 3.000 SLEEVE-c,$518 12,635.9 7,074.5 64.66 SEAL ASSY BAKER PBR 80/40 SEAL ASSEMBLY 3.000 AL IA Perforations&Slots NIPPLE,12,596 ilIC. Shot ir Top(TVD) Btm(TVD) Dens I j ... q Top(RKB)Btm(RKB) (RKB) (RKB) Zone Date Oh.. Type Comment LOCATOR, BE 13,811.0 18,073.0 7,351.5 7,312.0 ALPA,CD2-31 7/1/2004 6.0 PERFP Slotted Liner,1 Perf Pup joint every 4 .835 i- S SEAL ASSY, joints of blank,w/eight 1/2"holes 12.636 '' 1 Stimulations&Treatments Bottom Min Top Max Btm Top Depth Depth Depth Depth (TVD) (TVD) (ftKB) (RKB) (RKB) IRKS) Typo Date Comment 13,811.0 18,073.0 7,351.5 7,312.0 FRAC 3/19/2007 Notes:General&Safety End Date Annotation PRODUCTION, A ' 7/1/2004 NOTE:TREE:FMC 4-1/16"5K-TREE CAP CONNECTION: 7"OTIS 35-13698 2/1/2011 NOTE:View Schematic w/Alaska Schematic9.0 T e ? I b . i PERFP, 13,811-18,073 FRAC,13,811 - av 7..3 I Mandrel Details Top Depth Top Port I- 1 5... (TVD) Incl OD Valve Latch Size TRO Run N...Top(RKB) (RKB) (') Make Model (In) Sere Type Type (in) (psi) Run Date Com... 1 5,383.9 3,399.5 59.05vCAMCO KBUG 1 GAS LIFT DMY BK-5 0.000 0.0 7/1/2004 = 2 9,909.0 5,697.8 58.77 CAMCO KBUG 1 GAS LIFT DMY BK-5 0.000 0.0 3/162007 3 12,430.2 6,981.6 62.11 CAMCO KBUG 1 GAS LIFT OV BK-5 0.250 0.0 3212007 - LINER, 12,629-18,119 TD(CD2-31),� :J I. 18,131 _ e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ () Id- 0 13 ~ Well History File Identifier Organizing (done) o Two-sided "' 11111111 ""1111 o Rescan Needed 111111111111111I111 RESCAN ~Ior Items: o Greyscale Items: DIGITAL DATA ~kettes, No. t!- O Other, NofType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: BY: ~ Date cg ~ cdo Date <ö ~ vb o Other:: Project Proofing BY: ~ 151 lL11-P 11111111111I11 11111 151 mp BY: .:3 x 30 =.!1..!?-- + :J. 0 = TOTAL PAGES--1lD (Count does not include cover sheet) D Date: 151 IT 1111111111111/11111 Scanning Preparation Production Scanning Stage 1 Page Count from Scanned File: lU- (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ YES BY: c:Yaria ) Date: 1) / I Lf I 00 Stage 1 If NO in stage 1 page(s) discrepancies were found: YES NO 151 01 P NO BY: Maria Date: 151 11111111111I1111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 11111111111I 111111I 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N REPORT OF SUNDRY WELL OPERATIONS 1. OperationsPertormed: Abandon Re airwell ~~iea°y~ s ~~~~ {'~;~s• ~Gf>liltlS~iOr p Rug Perforations ~'°' Stimulate ~' Ofhe~ ~`"= ` After Casing '"' FUII Tubing ~°" Perforate New Pool "" Waiver r Time Extension ` ,~"- Change Approved Program """ Operat. Shutdow n Perforate ~ Re-enter uspended Well ~"" 2. Operator Name: 4. Current Well Status: .Permit to Drill Number: ConocoPhillips Alaska, Inc. Development r Exploratory ""` 204-082 3. Address: Stratigraphic ~ Service API Number: P. O. Box 100360, Anchora e, Alaska 99510 50-103-20493-00 7. Property Designation: 8. Well Name and umber: ~ ADL 380075, 387207, ASRCNPR1 CD2-31 . Field/Pool(s): Colville River Field /Alpine Oil Pool 10. Present Well Condition Summary: Total Depth measured ~ 18131 feet Plugs (measured) None true vertical ~ 7311 feet .sunk (measured) None Effective Depth measured 18131' feet Packer (measured) 12629 true vertical 7311' feet (true vertucal) 7072 Casing Length Size MD TVD Burst Collapse CONDUCTOR 109 16 109 109' SURFACE 3302 9.625 3302 2364' PRODUCTION 13598 7 13598 7339' LINER 5441 4.5 18119 7311' ' ' ' Perforation depth: Measured depth: 13811 -14850 , 15245 -18073 True Vertical Depth: 7349'-7336', 7325'-7312' Tubing (size, grade, MD, and TVD) 3.5, L-80, 12628 MD, 7071 TVD Packers &SSSV (type, MD, and TVD) PACKER - ZXP LINER TOP PACKER @ 12629 MD and 7072 TVD TRDP - CAMCO TRM-4E SSSV @ 2307 MD and 1878 TVD 11. Stimulation or cement squeeze summary: Intervals treated (measured): 13811'-14850', 15245'-18073' Treatment descriptions including volumes used and final pressure: 131 bbl hybrid SC81e 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 945 1746 123 -- 289 Subsequent to operation 1136 206 1991 -- 269 13. Attachments .Well Class after proposed work: Copies of Logs and Surveys run Exploratory Development Service Well Status after work: Oil I/', Gas WDSPL Daily Report of Well Operations XX GSTOR '"` WAG ~""" GASINJ ~ WINJ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: none contact Tim Schneider Printed Name Tim Schne' er _ Title Alpine Production Engineer Signature ) Phone: 265-6859 Date ~D RBDMS JAN i 12010 G~'~ ///lam `~' ~~`'~~' Form 10-404 Revised 7/2009 ~ Submit Original Only L~ CD2-31: 1/2/10: Pumped a 131 bbl Hybrid Scale squeeze treatment containing 825 gallons SCW-3001 WC SI. An 3 bbl crude pre & post flushed each stage with 10% WAW5206 (26 gallons/stage). Pumped squeeze in 7 stages diverted withl.l SG bio-balls. Displaced with 306 bbls crude. Treating pressure started at 700 psi dropping to a vacuum at the end of stage 1. SI for 12 hours. TUBING (80-12628, OD:3.500, ID:2.992) SURFACE (0-3302, OD:9.625, Wf:36.00) PRODUCTION (0-13598, OD:7.000, Wt26.00) SLEEVE-C -- (12518-12519, OD:5.323) PUP (12597-12635, OD:3.500) PACKER (12629-12630, OD:6.540) SEAL (12635-12636, OD:4.000) SBE (12659-12660, OD:6.250) FRAC (13811-18073) Perf (13811-14850) Perf (15245-18073) ALPINE CD2-31 :7 • CD2-31 Details ~-~~.~®~ -~ ~~ ~. ~ ~ ~r ~~~NNE®APR 2 9 2008 • ~Ot1~C~ h!~'~ ~ Casing Detail 9 5/8 ` Surface Casin Well: CD2-31 Date: 6/7/2004 Jt Number Num of Jts COIVIPLETE DESCRIPTION OF EQUIPMENT RUN DEPTH LENGTH TOPS Doyon 19 RKB to Landing Ring 36.70 FMC Gen V Hanger 2.19 36.70 Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg 3175.15 38.89 Davis Lynch Float Coilar 1.48 3214.04 Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 84.11 3215.52 Ray Oil Tools "Silver Bullet" Float Shoe 2.30 3299.63 3301.93 TD 12 1/4" Surface Hole 3312.00 RUN TOTAL 45 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - #12 (One stop ring on Jt #2) and over collars on jts# 14, 16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36, 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58, 60, 62 64, 64, 66, 613,70,72,74,76,78 I (86 joints in the pipe shed. Run 79 joints -7 -joints stay out I I I Use Best-o=~Lifie 2000 i e do e Remarks: Up Wt - 175 k Dn Wt - 125 k Block Wt - 75k • Supervisor.' D. Burley / D. ConocoPhillips Alaska Page 1 flf 1 Casing Report Legal Well Name: CD2-31PB1 Spud Date: 6/5!2004 Common Well Name: CD2-31 P61 Report #: 1 Report Date: 6/7/2004 Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004 General Information String Type: Surface Casing Permanent Datum: Rotary Table Hole Size: 12.250 {in) Hole TMD: 3,312.0 (ft) Hole TVD: 2,372.0 (ft) KB-Datum: 0.84 (ft) Water TMD: (ft) Str Wt on Slips: (Ibs) -Ground Level: - 15:90 (ft) ~ •••- • CF F!e~ration: (ft) ~ • - Liner••weriap: (ft) •• Max Hole Angle: 61.81 (°) Circ Hours: 2.00 (hr) Mud Lost: (bbl) KB to Cutoff: 36.70 (ft) Days From Spud: 2.25 (days) Casing Flange / Wellhead Manufacturer: FMC Model: Producer Top Hub/Flange: (in) / (psi) Hanger Model: Packoff Model: BTM Hub/Flange: (in) / (psi) Actual TMD Set: 3,301.93 (ft) Integral Casing Detail Item Slze Weight Grade Drift Threads JTS Length Top MU Torq. THD Manufacturer Model Cond. Max OD Min ID Comp. Name (in.) (Ib/ft) (in) (ft) (ft) (ft-Ibf) (in) (in) Casing Hanger 9.625 8.765 2.19 36.70 Casing Hanger Casing 9,625 36.00 J-55 8.765 BTC 77 3,175.15 38.89 8.921 9 5/8" 36# J-55 Float Collar 9.625 BTC 1.48 3,214.04 Y WEATHERFORD Float Collar Casing 9.625 36.00 J-55 8.765 BTC 2 84.i 1 3,215.52 Y 8.921 9 5/8" 36# J-55 Float Shoe 9.625 BTC 2.30 3,299.63 Y RAY OIL TOOLS Float Shoe 3,301.93 Non-Integral Casing Accessories Accessory Manufacturer Number Spacing Interval How Fixed (ft) Top (ft) Bottam (ft) Bowspring Centralizer WEATHERFORD 12 2,838.0 3,292.0 OverCollar Bowspring Centralizer WEATHERFORD 33 77.0 2,760.0 OverCollar Remarks Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections -fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' -Circulate btms up 4 bbls/min @ 260 psi - PU .130 SO 100 -Continue running csg f/ 1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. -Land casing w! FMC fluted hanger w/shoe @ 3302' - FC @ 3214' v Printed: 8!16/2005 7:04:00 AM • • ConocoPhillips Alaska Page 1 of 3 Cementing Report Legal Well Name: CD2-31 PB1 Spud Date: _ 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004 Event Name: ROT -DRILLING Start: 6/5/2004 End: 7!2!2004 Cement Job Type: Primary Prima 5 ueeze O en Hole S ueeze Casin Plu Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size: TMD Set: 3,302 (ft) SQ TMD: (ft) TMD Set: Top Set: (ft} Date Set: 6/7/2004 SQ Date: Date Set: BTM set: (ft) Csg Type: Surface Casing S4 Type: Csg Type: Plug Date: Csg Size: 9.625 (in.) SQ TMD: Plug Type: • SQ Date: Drilled Out: Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: Dowell Schlumberger Cementer: Steve Daughton Pipe Movement: Reciprocating Pipe Movement Rot Time Start: Time End: RPM: !nit Torque: (ft-Ibf) Avg Torque: (ft-Ibt] Max Torque: (ft-ibf) Rec Time Start:21:00 Time End: 00:30 SPM: 1 Stroke Length: 25.0 (ft) Drag Up: 150,000 (Ibs} Drag Down: 125,000 (Ibs) Stage No: 1 of 1 Type: Cement Casing Start Mix Cmt: 23:07 Disp Avg Rate: 7.00 (bbl/min) Returns: 100 Volume Excess %: 167.00 Start Slurry Disp1 : 23:07 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost:. (bbl) Meas. From: 130 Start Displ: 00:14 Bump Plug: Y Gmt Voi to Surf: 1130.00 (bbl) Time Circ Prior End Pumping: 00:53 Press Prior: 700 (psi) To Cementing: 1.50 End Pump Date: 6/8/2004 Press Bumped: 1,100 (psi) Ann Flow After: N Mud Circ Rate: 252 (gpm} Top Plug: Y Press Held: 10 {min) Mixing Method: Mud Circ Press: 260 (psi} Bottom Plug: Y Float Held: Y Density Meas By: Densemeter Mud Data Type: Spud Mud Density: 9.6 (ppg) Visc: 55 (s/qt) PV/YP: 23 (cp)/16 (Ib/100ftz) Gels 10 sec: 5 (ib/100ft~) Gels 10 min: 10 (Ib/100ftz) Bottom Hole Circulating Temperature: (°F) Bottom Hole Static Temperature: (°F} Displacement Fluid Type:Mud Density: 9.6 (ppg) Volume: 228.40 (bbl) Stage No: 1 Slurry No: 1 of 4 Slurry Data Fluid Type: FLUSH Description: Biozan water w/ nut plug Class: Purpose: Flush & marke Slurry Interval: (ft) To: (ft) Cmt Vol: 40.0 {bbl) Density: 8.30 (ppg) Yield: (ft'/sk) Mix Water: (gal) Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: Q Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi) Free Water. (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: {°F) ~. Printed: BJ76/2005 7:0322 AM • ConocoPhillips Alaska Page 2 of 3 Cementing ReporE Legal Well Name: CD2-31 P61 Spud Date: 6/5/2004 Common Well Name: CD2-31PB1 Report#: 1 Report Date: 6/7/2004 Event Name: ROT - DRrLLING Start: 6/5/2004 End: 7!2/2004 Stage No: 1 Slurry No: 2 of 4 Slurry Data Fluid Type: Spaces Description: MUDPUSH XL Class: Purpose: SPACER Slurry Interval: (ft) To: (ft) Cmt Vol: 44.0 (bbl) Density: 10.50 (ppg) Yield: (ft'/s k) Mix Water. (gal) Water Source: lake Slurry Vof: (sk) Water Vol: (bbi) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) {psi) Free Water: (%) .Temperature: (°F) Compressive Strength 2: {°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Stage No: 1 Slurry No: 3 of 4 Slurry Data Fluid Type: LEAD Description: ASLite Class: Purpose: PRIMARY Siuny Interval: 2,802.00 (ft}To: (ft) ~ Cmt Vol: 394.0 (bbl) Density: 10.70 (ppg} Yield: 4.28 {fN/sk) Mix Water:20.00 {gal} Water Source: lake Slurry Vola07 (sk) Water Vo1:243.0 (bbi) Other Vof: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi) Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Stage No: 1 Slurry No: 4 of 4 Slurry Data Fluid Type: TAIL ~ Description: Class: G Purpose: PRIMARY Slurry Interval: 3,302.00 (ft)fo: 2,802.00 (ft) Cmt Vol: 50.0 (bbi) Density: 15.80 (ppg) Yield: 1.17 (ft'/sk) Mix Water: 5.00 (gal) Water Source: lake Slurry VQ 240 (skl Water Vo1:30.0 (bbl) Other Vol: {} Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: {°F) (psi) Free Water. (%) Temperature: (°F) Compressive Strength 2: {°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: {°F) Stage No: 1 Slurry No: 4 of 4 -Additives Trade Name T e Concentration. Units Li uid Conc. Units D-46 ~ DEFOAMER 0.2 %BWOC D-65 DISPERSANT 0.3 %BWOC S1 ACCELERATOR 1.0 %BWOC Printed: 6116/2005 7:1)3:22 AM • • ConocoPhillips Alaska Page 3 of 3 Cementing Report Legal Well Name: CD2-31 P61 Spud Date: 6/5/2004 Common Well Name: CD2-31PB1 Report #: 1 Report Date: 6/7/2004 Event Name: ROT -DRILLING Start: 6!5/2004 End: 7/2/2004 Casing Test Shoe Test Liner Top Test Test Press: 2,500 {psi) Pressure: (ppge) Liner Lap: For: 30 (min) Too{: N Pos Test: (ppge) Tool: N Cement Found between Open Hole: (ft) Neg Test: (ppge) Tool: N Shoe and Collar: N Hrs Before Test: Hrs Before Test: Cement Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (ft) Under Pressure: {psi} How Determined: Bond Quality: TOC Sufficient: N Cet Run: N Job Rating: Bond Quality: If Unsuccessful Detection Indicator: Temp Survey: N Remedial Cementing Required: N Hrs Prior to Log: Number of Remedial Squeezes: Remarks Cement 9 5/8" casing as follows: Pumped 40 bbis Biozan water w/ nut plug for marker w/ rig pumps -Switch to Dowell -Pumped 2 bbis water -Test lines to 2500 psi -Drop bottom plug -Mixed & pumped 50 bbis Mud Push XL @ .10.5 ppg -Mixed & pumped Lead slurry AS lite3) @ 10.7 ppg -Observed nut plug marker @ sharkers w! 375 bbis lead pumped -pumped 394 bbis tots{ of lead slurry -Prep to switch to tail slurry Mixed & pumped Tail slurry (G w/ .2% D046, .3% D065, & 1 % S002) @ 15.8 ppg -Dropped top plug w/ 20 bbis water f/ Dowell -Switch to rig pumps & displace cement w! 228.4 bbis 9.6 ppg mud @ 7 B/M f/ 420 to 790 psi -slowed pumps to 3 1!2 B/M for last 18.4 bbis of displacment -Bumped plug w/ 1100 psi - C1P @ 0053 hrs. -Full circulation throughout w/ 130 bbis. 10.7 ppg cement reutms to surface Printed: 8/162005 7:03:22 AM • Page 1 of 3 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME ~ CD2-31 JOB NUMBER E VENT CODE ODR 24 HRS PROG 149.0 TMD 3,312.0 ND 2,368.0 DFS REPT NO. 2.25 3 DATE 6!7/2004 SUPERVISOR D. Burie / D. Micke RIG NAME & NO. Do on Driilin Inc 19 FIELD NAME I OCS NO. ALPINE AUTH MO D 18,682.0 AILY TANG 0 CUM. TANG 0 CURRENT STATUS Pre tD test BOPS ACCIDENTS LAST 24 HRS.? DAILY lNT W!O MUD 0 CUM INTANG W/MUD 0 24 HR FORECAST Test BOPE- PU DP - MU BHA#2 - RIH -FIT - Drill 8 1/2" hole DATE OF LAST SAFETY MEETING 6/7/2004 DAILY TOTAL 205 298 CUM COST W/MUD 581,605 LITHOLOGY JAR tlRS OF SERVICE BHA HRS SINCE INSP LEAKOFF AFE 10034643 AUTH. LAST SURVEY: DATE TMD INC AZIM 6R/2004 3 262.53 61.257 266.810 LAST CASING 9.625 in 3,302.0 ft NEXT CASING 7.000 In 13,737.0 ft LAST BOP PRES TEST DENSITY(ppg) 9.60 PP ECD MUD DATA DAILY COST D GUM COST 0 FV PV/YP GELS WUHTHP FC/T.SOL OILNVAT %Sand/MBT Ph/pM Pf/Mf CI Ca H2S LIME ES 300 34/82 42/95 7.4/ 3/ / 0.5/27.5 8.7/ 0.01/0 20 BHA NO. 1 BHA i HOLE CONDITIONS BrrNO. 1 BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE /UNITS BHA LENGTH 24,568 140 120 130 8,500 ft-Ibf 977.28 ITEM DESCRIPTION NO JTS LENGTH O,D. I.D. CONN SIZE CONN TYPE Bit ~ 1 1.00 12.250 4.500 Mud Motor 1 31.10 8.000 5.000 Sub -Float 1 2.47 8.000 2.870 Stabilizer 1 5.92 8.150 2.875 Crossover -NonMag 1 2.44 8.140 2.875 MWD 1 9.17 8.020 3.500 MWD 1 8.70 8.020 1.920 MWD 1 9.90 8.090 1.900 Sub - Bottam Hole Orienting 1 3.00 8.100 2.813 Drill Collar -NonMag 1 31.03 2.812 2.875 Drill Collar -NonMag 1 31.03 8.062 2.880 Drill Collar -NonMag 1 30.80 8.062 2.880 Crossover 1 3.02 6.750 2.780 Drill Pipe -Heavy Wgt 3 89.85 5.000 3.000 Jars 1 32.70 6.130 2.500 Drill Pipe -Heavy Wgt 23 685.15 5.000 3.000 BITS BIT! RUN SIZE MANUF. ~ TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN I.O-D-L-B-G-O-R 1 / 1 12.250 HUGHES-CHR MX-C1 5044528 12!16!16/181/ 114.0 6/5!20 1-1-WT-A-E-1-NO-TD BIT OPERATIONS BIT /RUN WOB RPM GPM PRESS P 81T HRS 24Hr D15T 24Hr ROP CUM HRS CUM DEPTH CUM ROP 1 / 1 20 / 30 / 84 656 2,600 673 1.04 149.0 143.27 21.56 3,198.0 148.33 SURVEY DATA M:D. INCL. AZIMUTH T.V.D. ~ N/S CUM EM/ CUM SECTION M.D. INCL AZIMUTH T.V.D. N/S CUM EIW CUM SECTION 3,209.94 60.927 266.030 2,319.17 -59.69 -1,807.4 1,678.38 3,262.53 61.257 266.810 2,344.60 -61.76 -1,853.4 1,720.90 PUMP / HYDRAULEC DATA NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q (gpm) PRESS. (psi ) TOTAL Q KILLSPM /PRESSURE 1 Continenta{ Emsco 12.000 6.000 75 317.26 2,600 655.67 2 Continental Emsco 12.000 6.000 80 338.41 2,600 655.67 rnntea: wieiwun /:UL:Z3 AM • • ' Page 2 of 3 ConocoPhiNips Alaska, {nc. Daily Drilling Report WELL NAME JOB NUMBER EVENT CODE 24 NRS PROG TMD TVD DFS REPT NO. DATE CD2-31 ODR 149.0 3 312.0 2,368.0 2.25 3 6/7/2004 O PERAT IONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 01:15 1.25 DRILL P DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD WOB 20/30 k RPM 80 GPM 650 @ 2500 psi String wL PU 140 SO 120 Rot. 130 Torque on/off btm - 8,500/7,500 ft. lbs. ADT - 1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs. 01:15 02:30 1.25 DRILL P CIRC SURFAC CBU @ 650 gpm / 2400 psi / 80 rpm, pumped 40 bbis low vis sweep and circ . hole clean. 02:30 04:15 1.75 DRILL P ~ WIPR SURFAC Backream from 3312' to 2270' - 400 gpm / 1120 psi / 80 rpm. Circ BU to clean hole while Backreaming from 2270' to 2175'. 04:15 05:30 1.25 DRILL P WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm / 1100 psi / 80 rpm. CBU on last stand to clean up hole. 05:30 06:30 1.00 DRILL P WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'. 06:30 08:00 1.50 DRILL P CIRC SURFAC CBU - 675 gpm / 2600 psi / 80 rpm, pumped 40 bblls high vis sweep and circ hole clean. Flow check well, static. 08:00 09:00 1.00 DRILL P TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-SK over, began pulling tight @ 1650'.Worked up to 1640' with several attempts to 50k over. 09:00 11:00 2.00 DRILL Np DH TRIP SURFAC Backream from 1670' to 970' - 500 gpm / 1400 psi ! 80 rpm. CBU on last stand -heavy cuttings load back. Flow check well, static. 11:00 14:15 3.25 DRILL P PULD SURFAC Stand back hwdp and flex collars -lay down UBHO, mwd, stab, motor and bit. Clean up trip mess and clear tools from rig floor. 14:15 15:15 1.00 CASE P KURD SURFAC RU to run 9 5/8" surtace casing 15:15 15:30 0.25 CASE P SFTY SURFAC Held PJSM with crew. 15:30 21:00 5.50 CASE P RUNG SURFAC Run 9 5f8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1st four connections -fill pipe -circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbis/min @ 260 psi - PU 130 SO 100 -Continue running csg f! 1624' to 3263` - 39 jis (79 total) - PU hanger & landing jt. -Land casing w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214' 21:00 22:30 1.50 CEMENT ~ CIRC SURFAC Rig down casing equipment - RU cmt head & fines -Circulate & condition for cement job - ICP 300 psi @ 3 8/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125 22:30 00:00 1.50 CEMENT PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbis Biozan water w[ nut plug for marker w/ rig pumps -Switch to Dowell -Pumped 2 bbls water -Test lines to 2500 psi -Drop bottom plug -Mixed & pumped 50 bbis Mud Push XL @ 10.5 ppg -Mixed & pumped Lead slurry (AS lite3) @ 10.7 ppg -Observed nut plug marker @ sharkers w/ 375 bbis lead pumped -pumped 394 bbls total of lead slurry -Prep to switch to tail slurry 24 HR SUMMARY: Drill 12 1/4" hole f! 3162' to 3312' MD -Pump sweep & circulate hole clean -Wiper trip to 1670' -RIH -pump sweep and circ clean- POOH, lay down BHA - RU and Run 9 5/8" casing - Cmt csg. PERSON NEL DATA COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhillips Company 1 Halliburton -Sperry-Sun 2 Fairweather E&P Service 1 Halliburton -Sperry-Sun 1 Doyon Drilling Inc 27 M-I Grilling Fluids 3 Arctic Catering Inc. 5 Swaco 4 Dowell 2 FMC Corporation Wellhe 1 Halliburton -Sperry-Sun 2 • • ConocoPhillips Alaska, Inc. Daily Drilling Report Page 3 of 3 WELL NAME CD2-31 JOB NUMBER EVENT CODE ODR 24 HRS PROG ~ 149.0 TMD 3,312.0 TVD 2,368.0 DFS 2.25 REPT NO. 3 DATE 6/7/2004 ' MATERIALS /CONSUMPTION ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND Fuel gals 1,344 -3,815 Water, Potable bbts 120 -360 Water, Drilling bbls 350 -3,370 Fuel, Camp gals RESERVOIR AND INTERVAL DATA RESERVOIR NAME ZONE TOP BASE COMMENTS CD2-12 CD2-31 933 3.5 1440 rnntea: w iorzu~a ruc.~o nrv~ PRESSURE_INTEGRITYTEST CONOCOPHILLIPS Alaska, Inc. Weii dame: CD2-31 Rig: Doyon 19 Date: 6/9/2004 Drilling Supervisor: Burley /Mickey Pump used: #2 Mud Pump ~ Type of Test: OpenholeTest LOT/F1T ~i" Pumping down annulus and DP. • Hole Size: 8-i/2" ~' Casing Shoe De th Hole De th RKB-CHF: 36.7 Ft 3,302 Ft-MD 2,367 Ft-ND 3,332 Ft-MD 2,378 Ft-TVD Casina Size and Description: 9-5/8" 36#/Ft ]-55 el'C ~ Casin Test Pressure Inte rit Test Mud Weight: 9.6 ppg Mud Weight: 9.5 ppg Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2 Test Pressure: 2,500 psi Rotating Weight: 115,000 Lbs Rotating Weight: 75,000 Lbs Blocks/Top Drive Weight: 75,000 Lbs BlockslTop Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg Estimates for Test: 2.4 bbls Estimates for Test: 1046 si 1 bbis v, ~ EMW =Leak-off Pressure + Mud Weight = 850 ,~ 9 5 PI715 Second 0.052 x TVD 0.052 x 2367 Shut-in Pressure, psi EMW at 3302 Ft-MD (2367 Ft-TVD) = 16.4 650 Volume In ut Volume/Stroke Pum Rate: strokes • 0.1000 13b1s/Strk • 6.0 Strk/min Casing Test Pressure Integrit Test Pum in Shut-in Pum ing Shut-in Strks si Min si Strks si Min 0 0 0 2500 0 0 0 2 50 1 2500 2 60 0.25 4 150 2 2500 4 205 0.5 6 300 3 2500 6 400 1 8 500 4 2500 8 600 1.5 10 700 5 2500 10 750 2 12 900 6 2500 12 850 2.5 14 1100 7 2500 14 870 3 16 1240 8 2500 16 900 3.5 18 1400 9 2500 18 4 20 1550 10 2500 20 4.5 22 1700 15 2500 5 i 800 650 610 580 570 560 555 550 545 540 540 540 _ . . _. ~ _„.,. ,.~, 24 1900 20 2500 5.5 540 sooo 26 2050 25 2500 6 540 6 5 535 28 2250 30 2500 .. 7 530 5oo 30 2450 z 31 2500 7 5 520 . 8 515 8 5 515 20°0 . 9 515 w 9 5 515 ~ . ~ 1500 10 510 w a 1000 500 0 ° 1 Barrel s 3 4 0 S 5 1 hut- 0 In tim 16 e, M 20 2 inut 5 es 30 Vol PU ume m ed Vol Bled ume Back Volume PUm ed Volume Bled Back ~~CASING TEST -t~~--LEAK-O FF TEST O P IT Poi nt 3.1 Bbls Bbis 2.0 Bbls Bbis Comments: Tested 9 518" casin after bum ing lugs on cement job. • • Conoc Phl~~~ ~ ~ Casing Detail 7" Casing Well: CD2-31 Date: 6/19/2004 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to Landing Ring 34.84 FMC Gen V Hanger 2.40 34.84 Jts 3 to 321 319 Jts 7" 26# L-80 BTCM Csg 13471.62 37.24 Davis Lynch Float Collar 1.30 13508.86 Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 86.15 13510.16 Ray Oil Tools "Silver Bullet" Float Shoe 2.10 13596.31 13598.41 TD 8 1/2" Hale 13608.00 Total Centralizers: 94 Straight blade centralizer one per jt on jts # 1-14 Straight blade centralizer one per jt on jts. # 243, 244, 245 Straight blade centralizer one per jt on every other joint Starting @ # 247 to # 279 Straight blade centralizer 2 per jt on jts 282 - 303 w/ stop collars Straight blade centralizer one per jt on jts # 303 - 319 ** 330 joints in shed - 321 total jts. to run Last 9 jts. out Use Best-o-Life 2000 i e do e Remarks: Up Wt - 350 + k Dn Wt - 145 `k Block Wt - 75k ** Did not install stop rings on jts #304 - 319 due to csg trying to stick in hole. Only 1 cent perjt. Supervisor. D. Lufrick / L. Hill • • ConocoPhiliips Alaska Page 1 of 3 ` Cementing Report Legal Well Name: CD2-31 PB1 Spud Date: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004 Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004 Cement Job Type: Primary Prima S ueeze O en Hole S ueeze Casin Plu Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 13,598 (ft) SO TMD: (ft) TMD Set: Top Set: (ft) Date Set: 6/19/2004 SQ Date: Date Set: BTM set: (ft) Csg Type: Production Casing SQ Type: Csg Type: Plug Date: Csg Size: 7.000 (in.) SQ 7MD: Plug Type: SQ Date: Drilled Out: Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Go: Dowel{ Schlumberger Cementer: Jim Thompson Pipe Movement: Pipe Movement Rot Time Start: Time End: ; RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibt) Max Torque: (ft-ibt) Rec Time Start: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs) Stage No: 1 of 1 Type: Cement Casing Start Mix Cmt: 03:38 Disp Avg Rate: 7.00 (bbl/min} Returns: 100 Volume Excess %: 40.00 Start Slurry Displ : 03:38 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl) Meas. From: N/A Start Displ: 03:50 Bump Plug: Y Cmt Vol to Surf: (bbl} Time Circ Prior End Pumping: 05:05 Press Prior. 900 (psi} To Cementing: End ~'ump Date: 6!19/2004 Press Bumped: 1,400 (psi) Ann Flow After: N Mud Circ Rate: 294 (gprn) Top Plug: Y Press Held: 1,400 (min) Mixing Method: Tub Mud Circ Press: 1,000 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densometer Mud Data Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 40 (s/qt) PV/YP: 8 (cp}/16 (Ib/100ft2} Gels 10 sec: 8 (Ib/100ft2 ) Gels 10 min: 11 (Ib/100ftZ) Bottom Hole Circulating Temperature: (°F`. Bottom Hole Static Temperature: (°F) Displacement Fluid Type:Mud Density: 9.8 (ppg) Volume: 516.00 (bbl) Stage No: 1 Slurry No: 1 of 3 Slurry Data Fluid Type: FLUSH Description: CW 100 Class: Purpose: Chemical was Slurry Interval: (ft) To: (ft) Cmt Vol : 20.0 (bbl) Density: 8.30 (ppg) Yield: (ft'/sk) Mix Water. (gal) Water Source: lake Slurry Vol: (sk) Water Vol: (bbl} Other Vol: Q Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi) Free Water. (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Printetl: 8l76I2005 7:03:47 AM ~i ConocoPhillips Alaska Page Z of 3 Cementing Report Legal Weli Name: CD2-31PB1 Spud D ate: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004 Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004 Stage No:1 Slurry No: 2 0# 3 Slurry Data Fluid Type: FLUSH Description: MUDPUSH XL Class: Purpose: SPACER Slurry Interval: (ft) To: (ft) Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ft'/sk) Mix Water: (gal) Water Source: Slurry Vol: (sk) Water Voi: (bbl) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: {°F) Compressive Strength 1: (°F) (psi) Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Stage No: 1 Slurry No: 3 of 3 Slurry Data Fluid Type: TAIL Description: Class: G Purpose: PRIMARY S1uny Interval: 13,598.00 (ft)o: 12,126.OG (ft~mt Vol: 47.0 (bbl) Density: 15.80 (ppg) Yield: 1.16 (ft'/sk) Mix Water. 5.09 (gat) Water Source: lake water Slurry Vo1234 (sk) Water Vo1:27.8 (bbl) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: {°F) (psi) Free Water: {%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F} Stage No: 1 Slurry No: 3 of 3 -Additives Trade Name T e Concentration Units Li uid Conc. Units D-65 DISPERSANT 0.3 %BWOC B-155 retarder 0.0 ~°BWOC D-46 DEFOAMER 0.2 %BWOC D-167 Fluid loss 0.4 %BWOC Printed: 8/76/2005 7:03:47 AM19 • ~ ConocoPhillips Alaska Page 3 of 3 . Cementing Report Legal Well Name: CD2-31PE1 .Spud Date: 6/5/2004 Common Wel{ Name: CD2-31PB1 Report#: 3 Report Date: 6/19/2004 Event Name: ROT -DRILLING Start: 6/5/2004 End: 7/2/2004 Casing Test Shoe Test Liner Top Test Test Press: (psi) Pressure: (ppge) Liner Lap: For: (min) Tool: Pos Test: (ppge) Tool: Cement Found between Open Hole: (ft) Neg Test: (ppge) Tool: Shoe and Collar: I ors Before Test: Hrs Before Test: Cement Found on Tool: Log/Survey Evaluation ~ Interpretation Summary CBL Run: Cement Top: (ft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: Cet Run: Job Rating: Bond Quality: If Unsuccessful Detection Indicator: Temp Surrey: ~ Remedial Cementing Required: Hrs Prior to Log: ~ Number of Remedial Squeezes: Remarks Pump 5 bbls CW 100. Test tines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H2O. Rig displaced with 497 bbls 9.8 mud. Bumped plug. Check floats OK. Test csg to 3500 psi. rnn[ea: wiorcuvo rv~.wr r.rvi • • Page 1 of 1 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME CD2-31 JOB NUMBER EVENT CODE ODR 24 HRS PROG TMD 13,608.0 TVD 7,342.0 OFS 13.25 KEPT NO. 14 DATE 6/18/2004 SUPERVISOR Donnie Lutrick / La Hil R1G NAME & NO. Do on Drillin Inc 19 FlELD NAME ! OCS NO. ALPINE AUTH MD 18,682.0 pA1LY FANG 0 CUM. TANG 0 CURRENT STATUS Ri down after cement ob. ACCIDENTS LAST 24 HRS.1 DAILY INT W/O MUD 0 CUM INTANG W! MUD 0 24 HR FORECAST Run 7". Cement 7". Test 80P. DATE OF LAST SAFETY MEETING 6/14/2004 DAILY TOTAL 87 503 CUM COST W/MUD 2 379,807 LITHOLOGY FINE SAND JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF 16.38 AFE 10034643 AUTH. LAST SURVEY: DATE TMO INC 6/16/2004 13,533.65 80.320 AZIM 318.950 LAST CASING 9.625 In 3,302.0 ft NEXT CASING 7.000 in 13,737.0 ft LAST BOP PRES TEST 6/14/2004 DENStTY(ppg) 9.80 PP ECD 9.80 MUD DATA DAILY COST 0 CUM COST 0 FV PV/YP GELS WLlHTHP FC(f.SOL OILNVAT 9roSandJMBT Ph/pM Pf/!V{f C) Ca H2S LIME ES 42 7120 8112 4.OR.2 ~ 1/ / 0.2(18.0 9.0/ 0.05/2 4 OPERATIONS SUMMARY FROM- TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 02:15 2.25 CASE P RUNC INTRM1 Rih w/ 7" csg from 250' to 3261'. 02:15 02:45 0.50 CASE P CIRC INTRMI Circ 1 csg volume at 5 bpm at 310 psi. 02:45 03:30 0.75 CASE T EQ1P OTHR INTRMI Change out Franks fill up tool. Cup was leaking. 03:30 07:45 4.25 CASE P RUNC INTRMI RIH wi 7" csg from 3261' to 7590'. 07:45 08:45 1.00 CASE P CIRC INTRMI Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. Dn wt -120k. 08:45 13:00 4.25 CASE P RUNC 1NTRM1 RIH w/ 7" csg from 7590' to 11,816'. 13:00 15:00 2.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. Dn wt - 145 k. 15:00 00:00 9.00 CASE P RUNC INTRM1 RIH w! 7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight 460 K up and All of weight down to make a few feet at a time. Attempts to circulate tried to pack off. 24 HR SUMMARY: Ran casing from 250' to 13515'. PERSON NEL DATA COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhil{ips Company 1 Halliburton -Sperry-Sun 2 Fairweather E&P Service 1 Haliiburton -Sperry-Sun Doyon Drilling lnc 27 M-I Drilling Fluids 3 Arctic Catering inc. ~ 5 Swaco 4 Dowell 2 FMC Corporation Wellhe 1 Ha{liburton -Sperry-Sun 2 MATERIALS /CONSUMPTION {TEM UNITS USAGE ON HAND ITEM UN1TS USAGE ON HAND Fuel gals 750 9,075 Water, Potable bbis 120 680 Water, Drilling bbis 250 820 Fuei, Camp gals 2,080 RESERVOIR AND INTERVAL DATA RESERVOIR NAME ZONE TOP BASE COMMENTS GD2-36 Cd2-31 20 2 1470 YMI20: Ol-10/LWD /:UL:4O HIVI • • Page 1 of 2 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME CD2-31 JOB NUMBER E VENT CODE ODR 24 HRS PROG TMD 13,608.0 TVD 7,342.0 DFS 14.25 REPT NO. 15 GATE 6/19/2004 SUPERVISOR Donnie Lutrick / La Hi RIG NAME & NO. l Do on Drillin Inc 19 FIELD NAME i OCS NO. ALPINE AUTH MD 18,682.0 OAILY TANG 0 CUM. TANG 0 CURRENT STATUS Circulatin rior to doin FIT. ACCIDENTS LAST 24 HRS.? DAILY INT W/0 MUD 0 CUM INTANG W! MUD 0 24 HR FORECAST FIT. Chan a out mud s stem to fv106M and drill. DATE OF LAST SAFETY MEETING 6!14!2004 DAILY TOTAL 449,583 CUM COST W! MUD 2 829,390 LITHOLOGY FINE SAND JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF 16.38 AFE 10034643 AUTH. LAST SURVEY: DATE TMD INC AZIM 6/16/2004 13,533.65 80.320 318.950 LAST CASING 7.000 in 13 598.0 ft NEXT CASING 4.500 in 18,682.0 ft LAST BOP PRES TEST 6/19/2004 DENSITY(ppg) 9.80 PP ECD 9.80 MUD DATA DAILY COST 0 CUM COST 0 FV PVlYP GELS WLMTHP FC/T.50L OILNVAT °J°Sand/M8T PhipM PfiMf Cf Ca H2S LIME ES 40 8/16 8/11 5.2/7.2 1/ 1 0.2/15.0 9.0/ 0.05/2 4 BHA NO. 4 BHA /HOLE CONDITIONS BR No. 4 BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE /UNITS BHA LENGTH 376.78 ITEM DESCRIPTION NO JTS LENGTH O.D. LD. CONN SIZE CONK TYPE Bit 1 0.75 6.125 2.250 Motor 1 32.48 4.974 2.794 6" Stab 1 5.53 4.790 2.256 Sub -Float 1 2.40 4.625 2.250 MWD 1 8.56 4.720 2.625 MWD 1 24.47 4.750 1.250 MWD 1 10.86 4.700 1.250 MWD 1 11.01 4.630 2.815 NM Flex DC's 3 93.84 4.700 2.250 Crossover 1.16 4.770 2.625 3 X HWDP 3 91.95 3.500 2.060 Jar DNT 32.46 4.750 2.000 2 X HWDP 2 61.31 3.500 2.063 BITS BIT I RUN SIZE MANUF. TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN i-O-D-L-B-G-O-R 4 / 4 6.125 HUGHES-CHR HC 306 7102089RB 12/12/13/13/13!13 13,608.0 6/191200 1-1-CT-M-D-I-EC-TD BIT OPERATIONS BIT /RUN WOB RPM GPM PRESS P BIT HRS 24Hr DIST 24Hr ROP CUM HRS CUM DEPTH CUM ROP OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 00:30 fl.50 CASE P RUNG 1NTRM1 Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and landed casing @ 13598'. 00:30 01:00 0.50 CASE P RURD INTRM1 Rigged down fill up tool and made up cement head and lines. 01:00 03:15 2.25 CEMENT CIRC (NTRM1 Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure and flow stabilized. Final circulating pressure 1000 PS{ @ 7 BPM with full returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back on hanger. PJSM for cement job. 03:15 05:15 2.00 CEMENT PUMP INTRMI Pump 5 hbis CW100. Test lines to 3500 psi. Pump 15 bb)s CW100, 50 bbis 12.5 mud push. Drop bottom plug and 47 bbis 15.8 cement. Drop top plug. Dowell pumped 20 bbis H2O. Rig displaced with 497 bbis 9.8 mud. Bumped plug with 1400 PSI. Check floats OK. CIP @ 0505Hrs. 6H 9/04. Printed: 8116/2005 7:02:56 AM • • Page 2 of 2 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME CD2-31 JOB NUMBER EVENT CODE ODR 24 HRS PROG TMD 13,608.0 TVD 7,342.0 DFS 14.25 KEPT NO. 15 DATE 6/19/2004 OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 05:15 06:00 0.75 CASE P MIT INTRM1 Rigged up and tested casing 3500 PS{ for 30 miniutes. 06:00 06:45 0.75 CASE P RURD INTRMI Rigged down cement and casing tools. 06:45 07:45 1.00 CASE P DEQT INTRMI Laid down landing joint. Installed and tested packoff. 07:45 08:45 1.00 WELCTL EQRP INTRM1 Changed out rams from 7" to VBR. 08:45 13:00 4.25 WELCTL BOPE INTRMI Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke lines, kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing tests. Pull test plug and install wear bushing. 13:00 13:30 0.50 DRILL P RIRD ~ INTRM1 Picked up bales and elevators. 13:30 17:30 4.00 DRILL P PULD INTRMI Made up BHA and RIH. Shallow tested MWD. 17:30 20:30 3.00 DRILL P PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'. 20:30 00:00 3.50 DRILL P TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'. 24 HR SUMMARY: Ran and landed casing at 13598'. Circulated. Cemented casing. Tested casing to 3500 PSI. Rigged down tools and tested BOP. Made up and RIH with BHA and 150 Jts. DP from pipe shed. RIH with DP from derrick to 12500'. PERSON NEL DATA COMPANY SERVIf:E NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhillips Company 1 Hailiburton -Sperry-Sun Fairweather E&P Service 1 M-I Drilling Fluids 3 Doyon Drilling Inc 27 Swaco 4 Arctic Catering Inc. 5 FMC Corporation Wellhe 1 Dowell 2 ASRC Energy Services ( 2 Halliburton -Sperry-Sun 2 Epoch Well Services Inc 2 Halliburton - Sperry-Sun 2 MATERIALS /CONSUMPTION ITEM UNITS USAGE ON NAND ITEM UNITS USAGE ON HAND Fuel gals 560 8,515 Water, Potable bbls 120 960 Water, Drilling bbls 950 1,070 Fuel, Camp gals 2,080 RESERVOIR AND INTERVAL DATA RESERVOIR NAME .ZONE TOP BASE COMMENTS CD2-36 Cd2-31 1449 3.5 1420 CD2-31 CD2-31 392 4.3 1400 PRESSURE INTEGRITY TEST CONOCOPHILLIPS Alaska, Inc. Well Name: CD2 -31 Rig: Doyon 19 Date: 6/19/2004 Volume Input Pum Rate: Drilling Supervisor: Lutrick /Hill Pump used: Cement unit ~ Barrels •' ebls/stsk • 0~8 ab1/mtn Type of Test: Annulus Leak Off Test for Disposal Adequacy • Pumping down annulus. ~ Casin g Test Pressure In tegrit Test Hofe Size: s-1/z" 8 Ft RKB-CHF: 34 ~ Casin Shoe De th 302 Ft-MD 2,367 Ft-TVD 3 hole De th 12,126 Ft-MD 6,828 Ft-TVD Pum Bbls ing si Shu Min t-in si Pum Bbls in si Shu Min t-in si , . Casinq Size and Description: 9-5/8" 36#/Ft J-55 gTC • Chan es for Annular Ade uac Test Pressure Inte rit Test 0.5 1 25 56 0 0.25 480 460 shoe test results c in t in comments Mud Weight: 9.8 ppg 1.5 86 0.5 450 as g er u tion references outer i D casing string Inner casing OD: 7.0 In. 2 116 1 444 p escr t drilled below outer th i i . casing 2.5 147 1.5 444 a ze s th d TOC for Hofe De t ti . 3 177 2 444 . p e ma OD at ri ht a in i E t Desired PIT EMW: 15.5 ppg 3.5 212 2.5 439 g s g er nner c n Estimates for Test: 702 si 0.8 bbis 4 242 3 439 .r • 4.5 268 3.5 439 EMW =Leak-off Pressure + Mud Weight = 606 PIT 15 Second 5 298 4 439 + 9 8 052 x ND 0.052 x 2367 0 Shut-in Pressure, si 5.5 328 4.5 434 . EMW at 3302 Ft-MD (2367 Ft-ND) = 14.7. 460 6 353 5 434 6.5 384 5.5 429 ,oo0 ~ ~ 7 409 6 429 5 434 6 5 429 7. . 8 464 7 429 8.5 485 7.5 424 9 510 8 424 9.5 540 8.5 424 w ~ 0 60 9 419 p, c 1 5 a 10.5 586 9.5 419 w soo 11 606 10 419 '"""'`' " G 11 5 555 ~ - . I~ fi. 9 12 520 12.5 515 13 515 13.5 525 14 530 14.5 535 0 z z s so o z a s Barrel s , s a , z , a ,s o S s , hut-I a n tim T P s e, M t i o inut es Volume PUm ed Vol Bled ume Back Vo PU lume m ed Volume Bled Back ~t~r CASiNG TEST ~ -LEAK- OFF TEST O P I o n s s s s Comments: 9 5/8 LOT =16.4 PPG EM • • • i ;`-~ - MICROFILMED 03/01/2008 DO NOT PLACE `:, ""~ :--: ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc ~ 1. Operations Performed: ~;1 h-:'-t(~ .APR I 9 2007 Alaska 011 & Gas Cons. Commission REPORT OF SUNDRY WELL OPERATIONS Anchorage o Time Extension 0 Re-enter Suspended Well 0 Abandon 0 Alter Casing 0 ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION "'-',' Repair Well 0 Pull Tubing 0 Operat. ShutdownD Change Approved Program 0 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: P. O. Box 100360, Anchorage, Alaska 99510 7. KB Elevation (ft): RKB 53' 8. Property Designation: ADL 380075, 387207, ASRCNPR1 I 11. Present Well Condition Summary: Total Depth Effective Depth Casing Structural CONDUCTOR SURFACE PRODUCTION SLOTTED LINER Perforation depth: measured true vertical measured true vertical Length 109' 3249' 13545' 5441' Measured depth: true vertical depth: 18131' / 7311' / Size 16" 9-5/8" 7" 4-1/2" Plug Perforations 0 Perforate New Pool 0 Perforate 0 4. Current Well Status: Development [2] Stratigraphic 0 Stimulate [2] Waiver 0 Other Exploratory Service o o . 5. Permit to Drill Number: 204-082 ( 6. API Number: 50-1 03-20493-00 .- 9. Well Name and Number: CD2-31 <" 10. Field/Pool(s): Colville River Field 1 Alpine Oil Pool r feet feet Plugs (measured) Junk (measured) 7980'-8480' feet feet MD TVD Burst Collapse 109' 3302' 13598' 18119' sCANNED APR 262007 Tubing (size, grade, and measured depth) 3-1/2" , L-80, 12628' MD. Packers & SSSV (type & measured depth) No packer Cameo TRM-4E SSSV @ 2307' 12. Stimulation or cement squeeze summary: Intervals treated (measured) Treatment descriptions including volumes used and final pressure: Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl 2262 1 2855 19 15. Well Class after proposed work: Exploratory 0 Development [2] Service 0 16. Well Status after proposed work: Oil [2] GasD WAGD GINJD WINJ 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 307-079 13. Prior to well operation Subsequent to operation 14. Attachments Copies of Logs and Surveys run _ Daily Report of Well Operations _X Contact Printed Name Signature Tim Schneider T~7Scþ'neider I f/Sc0r¡{lô Form 10-404 Revised 04/2004 Oil-Bbl 2511 3,497 Casinç¡ Pressure Tubing Pressure 286 313 1179 1444 WDSPLD Title Phone Production Engineer 265-6859 Date ~v -( f-() l n P I ~ r K'M BFl APR 2 4 2007 Prepared bv Jeanne L Haas 263-4470 ,# t¡!zJØ7ubmiIOriQinaIOnIY 0/' '- '-" CD2-31 Stimulation results: Summary of stimulation job: 3-19-07: Pump 9 frac stages in stair steps; 2, 4, 7 & (12 PPA + 15 Bio-balls pumped between stages for diversion), 3704 bbls total slurry, 200 bbls diesel for freeze protect. AIR-25 BPM, AIP-1 000 psi, ISIP-2095 psi, 431,098 Ibs.16/30 White Sand in perfs. Well test: 4/6/07: 3497 bopd, 19 bwpd, 2.9 mmcfpd, 313 WHP .~ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 11, 2007 SCANNED APR 2 7 2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West th Avenue, Suite 100 Anchorage, AK 99501 aðlt- O'b ()- Dear Mr. Maunder: Sorry for the inconvenience, however it was observed that a spreadsheet sent to you and dated 3/31/07 was incomplete. Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). It was noticed that Alpine well CD2-404 was unintentionally left out of spreadsheet dated 3/31/07. Please find enclosed updated spreadsheet, and replace. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~.z::~---_/ ConocoPhillips Well Integrity Project Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft <:Ial C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-109 6" na 6" na 2.5 2/18/2007 C02-404 206-054 6" na 6" na 1.8 3/22/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/17/2007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 C02-21 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 CD2-31 204-082 15" na 15" na 6 3/8/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 .8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 3/8/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 3/8/2007 Alpine Field March 31,2007 . ~ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 31,2007 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West ih Avenue, Suite 100 Anchorage, AK 99501 .....,..,..'jIIII'_..........., Dear Mr. Maunder: $rNDIEÐ APR fj {) 20D7 . ...olò~ ~ö4 , ,-.. i~\ ',..J ;ì <~¡ Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of these wells were found to have a void in the condqçJAr.hy surface casing annulus. The voids that were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The remaining volume of annular void subsequently was filled with a corrosion inhibiter engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any questions. Sincerely, ~~C Jerry Dethlefs ConocoPhillips Well Integrity Proj Supervisor Attachment . . ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# cement pumped cement date inhibitor sealant date ft bbls ft gal C02-1 205-118 4" na 4" na 2 2/18/2007 C02-2 205-1 09 6" na 6" na 2.5 2/18/2007 C02-7 203-187 16" na 16" na 7.5 2/17/2007 C02-9 202-129 22" na 22" na 10.5 2/17/2007 C02-12 203-073 16" na 16" na 7.5 2/17/2007 C02-14 201-177 4" na 4" na 2 2/17/2007 C02-15 201-159 12" na 12" na 5.7 2/17/2007 C02-16 202-144 11 '7" 1.6 4" 4/16/2003 1 3/8/2007 C02-17 205-017 18' 2.5 4" 4/16/2003 1 3/8/2007 C02-18 203-151 36" na 36" na 17 2/17/2007 C02-19 202-112 11'5" 1.6 4" 4/16/2003 1.5 3/8/2007 C02-21 204-245 6" na 6" na 2.5 2/18/2007 C02-22 202-092 13'6" 1.8 4" 4/16/2003 1.5 3/8/2007 C02-24 201-095 6" na 6" na 1 3/8/2007 C02-26 201-232 10'5" na 4" 4/16/2003 1 3/8/2007 C02-28 202-217 29" na 29" na 11 3/8/2007 C02-30 203-135 8" na 8" na 3 3/8/2007 C02-31 204-082 15" na 15" na 6 3/8/2007 C02-32 202-029 8'6" 1.2 4" 4/16/2003 1 3/8/2007 C02-33 201-125 7' 1.0 4" 4/16/2003 1 3/8/2007 C02-34 202-126 4' 0.6 4" 4/16/2003 1 3/8/2007 C02-37 202-211 29" na 29" na 13.8 2/18/2007 C02-38 202-171 18" na 18" na 8.5 2/18/2007 C02-39 201-160 34" na 34" na 16.2 2/18/2007 C02-44 202-165 13" na 13" na 6.2 2/18/2007 C02-46 202-082 7'4" 1.0 12" 4/16/2003 5.7 2/18/2007 C02-47 201-205 25" na 25" na 11.9 2/18/2007 C02-48 202-108 10'6" 1.4 7" 4/16/2003 3.3 2/18/2007 C02-49 201-249 9'11" 1.3 8" 4/16/2003 3.5 2/18/2007 CO2-53 204-089 4" na 4" na 2 2/18/2007 CO2-54 204-178 8" na 8" na 3.7 2/18/2007 CO2-55 203-118 13" na 13" na 6 2/18/2007 CO2-57 204-072 8" na 8" na 1 3/8/2007 CO2-58 203-085 6" na 6" na 1 318/2007 CO2-59 204-248 6" na 6" na 1.5 3/8/2007 C02-60 205-068 6" na 6" na 1 318/2007 Alpine Field March 31,2007 . . SARAH PALIN, GOVERNOR A.1~A.SIiA OIL AlO) GAS CONSERVATION COMMISSION 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Tim Schneider Production Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Colville River Field, Alpine Oil Pool, CD2-31 Sundry Number: 307-079 "OlÖy ~oq ~MAR 062007 Dear Mr. Schneider: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). . As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this 6' day of March, 2007 Encl. ". . œr,/),o1 D?:::J ..5' / STATE OF ALASKA /? ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 Operational Shutdown 0 Plug Perforations 0 Perforate New Pool 0 1. Type of Request: o o o Pull Tubing Abandon Suspend Alter casing Repair well Change approved program 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: RECEIVED MAR 0 1 2007 Alaska ŒI & Gas Cons. Comm;' . A 1St nch o Time Extension 0 Re-enter Suspended Well 0 o o o Perforate 0 o Stimulate Waiver Other 0 4. Current Well Class: Development 0 Stratigraphic 0 Exploratory 0 Service 0 5. Permit to Drill Number: 204-082 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 7. If perforating, closest approach in pool(s) opened by this operation to nearest property line where ownership or landownership changes: Spacing Exception Required? Yes 0 No 0 CD2-31 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADL 380075; 387207,'ASRCNPR1 . RKB 53' Colville River Field/ Alpine Oil Pool 12. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 18131' , 7311' . 7980'-8480' Casing Length Size MD TVD CONDUCTOR SURFACE PRODUCTION SLOTTED LINER 109' 3249' 13545' 5441' 16" 9-5/8" 7" 4-112" Perforation Depth MD (ft): Perforation Depth TVD (ft): Date: Signature 50-103-20493-00 8. Well Name and Number: 109' 3302' 13598' 18119' Tubing Size: 3-1/2" Packers and SSSV MD (ft) Packer = 12629' SSSV= 2307' 14. Well Class after proposed work: Exploratory 0 Development 0 16. Well Status after proposed work: Oil 0 Gas 0 WAG 0 GINJ 0 Contact: Title: Phone 265-6859 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Packers and SSSV Type: Packer = ZXP Liner packer (38' of 43' seal SSSV= Cameo TRM-4E assy. In seal bore) 13. Attachments: Description Summary of Proposal 0 Detailed Operations Program 0 BOP Sketch 0 15. Estimated Date for Commencing Operations: April 2007 17. Verbal Approval: Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name neider Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 Other: Subsequent Form Required: l-\.a Approved by: Form 10-403 Revised 06/2006 n R I Burst Collapse Tubing Grade: L-80 Tubing MD (ft): 12628' Service 0 Plugged 0 WINJ 0 Abandoned 0 WDSPL 0 Tim Schneider @ 265-6859 Production Engineer Date J-/0;Z RBDMS BFt MAR 0 6 2007 Date: ß.. 5"",.01" ';,46 7 submi~uPIi~t.e '2..' 07 "~ . . Overview: CD2-31: A hydraulic fracture treatment will be performed in the open hole horizontal section to establish communication vertically and longitudinally throughout the Alpine "An and "C" sands. A 4-1/2" liner is inside the open hole interval with perforated 5' pups spaced throughout the liner section. Bio-balls will be used to divert the sand stages and 3 RA tracers; Ir-192, Sc-46 , and Sb- 124 will be added to determine the effectiveness of diversion in an effort to create multiple fractures along the openhole interval. This treatment will increase the wells production rate and reserves. A coil clean out will only be performed should it be necessary post-frac. " ./ Procedure: 1. MIRU seven clean insulated frac tanks with a berm surrounding the tanks that holds the tank volume plus 10%. Load tanks with seawater from the injection system (approximately 2500 bbls are required for the treatment) 2. Rig up stimulation equipment and stab Tree Saver. (Test tree saver seals to expected pressure using warm diesel to insure seal integrity in tubing hanger). 3. Pressure test surface lines to 9500 psi 4. Pump the 100 bbl Breakdown with Schlumberger's borate x-link fluid system (YF125ST). Bring pumps up to maximum rate ASAP. -- 5; Pump the following schedute at 25 BPMwithamaximum pressure of 9000 psI, addbre:aker as per lab results. Maintain 3000 þsion the IA during the treatment. K · 100 bbls YF125ST Pad (\O""'~\ ~..:>~\"'~ ~\,,;)~-\ ~ \O~O~\ · 35 bbls YF125ST wI 2 ppa 16/30 White Sand JJ1~ · 70 bbls YF125ST wI 4 ppa 16/30 White Sand ~ 15" · 100 bbls YF125ST wI 7 ppa 16/30 White Sand · 25 bbls YF125ST w/12 ppa 16/30 White Sand · Pump 20 balls in the next stages pad fluid. Repeat treatment above 8 times. · Flush the last stage with linear YF125ST and freeze protect Total Sand: -400,000Ibs. 6. Monitor the surface pressure fall-off at the end of the job for 30 min (or until closure is verified) if the well does not screen out. 7. Rig down equipment, (and prep for next well frac after evaluation by Engineering) move off location. FCO if required with slick diesel. ~~.i- DATA SUBMITTAL COMPLIANCE REPORT 8/2/2006 Permit to Drill 2040820, Well Name/No. COLVILLE RIV UNIT CD2-31 Operator CONOCOPHILLlPS ALASKA INC J>rzJ çj ~ ÀN:J Y API No. 50-103-20493-00-00 MD 18131""/ TVD 7311 ~ Completion Date 7/2/2004 / Completion Status 1-01 L Current Status 1-01L UIC N ---- REQUIRED INFORMATION Mud Log No Samples No Directional Survey ~ DATA INFORMATION Types Electric or Other Logs Run: Gr/ReslDens/Neu Well Log Information: (data taken from Logs Portion of Master Well Data Maint 12685 Gamma Ray 200 Interval OH / Start Stop CH Received Comments 7956 18131 7/16/2004 IIFR 7956 18131 7/16/2004 IIFR 7956 18131 7/16/2004 MWD 7956 18131 7/16/2004 MWD 0 13245 7/16/2004 IIFR PB1 0 13245 7/16/2004 IIFR PB1 0 13245 7/16/2004 MWD PB1 0 13245 7/16/2004 MWD PB1 3288 13161 Open 9/28/2004 PB 1, GR, NEUTRON, DENSITY, 3250 13245 Open 9/28/2004 PB 1, GR, NEUTRON, DENSITY, MWD/MAD 3274 18131 Open 9/28/2004 EWR4, DGR, CTN, ACAL, ASLD,ROP,GRC,FET 3312 13245 DUAL GAMMA RAY, THERMAL NEUTRON POROSITY, ASLD, ACAL . Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No I ED . aI Asc Directional Survey I~ Directional Survey ! ED ã;/ Asc Directional Survey -RPt Directional Survey ÉD 'Et" Asc Directional Survey cI Asc Directional Survey ED Directional Survey .RØ1 Directional Survey ED V1IF 12685 Induction/Resistivity 12685 LIS Verification 12697 Induction/Resistivity . Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments Permit to Drill 2040820 DATA SUBMITTAL COMPLIANCE REPORT 8/2/2006 Well Name/No. COLVILLE RIV UNIT CD2-31 Operator CONOCOPHILLlPS ALASKA INC MD 18131 TVD 7311 ADDITIONAL INFORMATION Well Cored? Y Æi:) Chips Received? ~ Analysis Received? Y'"1-N- Completion Date 7/2/2004 Completion Status 1-01L Current Status 1-01L API No. 50-103-20493-00-00 UIC N Comments: -~-- Compliance Reviewed By: Daily History Received? ~/N ~ Formation Tops mi-o Date: 7~ ~'c . . e - ConocJPt,illips Casing Detail 9518" Surface Casino (=704-oB-ð- Well: Date: CD2-31 6/7/2004 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS , Doyon 19 RKB to Landing Ring 36.70 I FMC Gen V Hanger 2.19 36.70 I I , Jts 3 to 79 77 Jts 9-5/8" 36# J-55 BTC Csg 3175.15 38.89 Davis Lynch Float Collar 1.48 3214.04 Jts 1 to 2 2 Jts 9-5/8" 36# J-55 BTC Csg 84.11 3215.52 Ray Oil Tools "Silver Bullet" Float Shoe 2.30 3299.63 3301.93 TD 12 1/4" Surface Hole 3312.00 RUN TOTAL 45 BOWSPRING CENTRALIZERS - 1 per jt on Jt #1 - #12 (One stop ring on Jt #2) and over co.llars on jts# 14,16,18,20,22,24,26,28,30, 32, 34, 36, 3ß,40, 42, 44,46, 48, 50, 52, 54, 56, 58,60,62 64,64,66,613,70,72,74,76,78 86 joints in the pipe shed. Run 79 joints -7 - joints stay out f".. c...,.,J ~ ""- '\ ~'r' \. "'- C:::-\.. \. _-l , (', , , ÐT'-\)~Q \ P\~ o.~(')\\ 1.... , 1\ " \~ \~. ~- . '.~"~~\\ , 'Y\,o ,,-- - '- . ¡; ~"-" .. -., .........., ~ ~c r}'\l\ \~l. -f"\ E... , r '(5 . Use Best-o-Ufe 2000 pipe dope Remarks: Up Wt - 175 k On Wt - 125 k Block Wt - 75k Supervisor: D. Bur/ey / D. Mickey ConocoPhillips Alaska Page 1 of 1 Casing Report Legal Well Name: CD2-31 PB1 Spud Date: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004 Event Name: ROT - DRILLING Start: 6/5/2004 End: 7/2/2004 General Information String Type: Surface Casing Permanent Datum: Rotary Table Hole Size: 12.250 (in) Hole TMD: 3,312.0 (ft) Hole TVD: 2,372.0 (ft) KB-Datum: 0.84 (ft) Water TMD: (ft) Str Wt on Slips: (Ibs) Ground Level: 15:90 (ft) " ,~- " CF E!evation: (ft) Liner..Overlap: (ft) Max Hole Ang!o: 61.81 n Circ Hours: 2.00 (hr) Mud Lost: (bbl) KB to Cutoff: 36.70 (ft) Days From Spud: 2.25 (days) Casing Flange / Wellhead Manufacturer: FMC Model: Producer Top Hub/Flange: (in) / (psi) Hanger Model: Packoff Model: BTM Hub/Flange: (in) / (psi) Actual TMD Set: 3,301.93 (ft) Integral Casing Detail Item Size Weight Grade Drift Threads JTS Length Top MU Torq. THO Manufacturer Model Condo Max 00 Min 10 Compo Name (in.) (Ibltt) (in) (ft) (ft) (ft-Ibf) (in) (in) Casing Hanger 9.625 8.765 2.19 36.70 Casing Hanger Casing 9.625 36.00 J-55 8.765 BTC 77 3,175.15 38.89 8.921 9 5/8" 36# J·55 Float Collar 9.625 BTC 1.48 3,214.04 Y WEATHERFORD Float Collar Casing 9.625 36.00 J-55 8.765 BTC 2 84.11 3,215.52 Y 8.921 9 5/8" 36# J-55 Float Shoe 9.625 BTC 2.30 3,299.63 y RAY OIL TOOLS Float Shoe 3,301.93 -.- Non-Integral· Casing Accessories Accessory Manufacturer Number Spacing Interval How Fixed (ft) Top (ft) Bottom (ft) Bowspring Centralizer WEATHERFORD 12 2,838.0 3,292.0 OverCollar Bowspring Centralizer WEATHERFORD 33 no 2,760.0 OverCollar Remarks Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. - Land casing w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214' e e Printed: 8/16/2005 7:04:00 AM e e GonocoPhillips Alaska Page 1 of 3 Cementing. Report Legal Well Name: CD2-31PB1 Spud Date: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004 Event Name: ROT ~ DRILLING Start: 6/5/2004 End: 7/2/2004 Cement Job Type: Primary Primary Squeeze Open Hole Squeeze Casing Plua Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size: TMD Set: 3,302 (ft) sa TMD: (ft) TMD Set: Top Set: (ft) Date Set: 6/7/2004 sa Date: Date Set: BTM set: (ft) Csg Type: Surface Casing sa Type: Csg Type: Plug Date: Csg Size: 9.625 (in.) sa TMD: Plug Type: sa Date: Drilled Out: Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: Dowell Schlumberger Cementer: Steve Daughton Pipe Movement: Reciprocating Pipe Movement Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Rec Time Start:21 :00 Time End: 00:30 SPM: 1 Stroke Length: 25.0 (ft) Drag Up: 150,000 (Ibs) Drag Down: 125,000 (Ibs) Stage No: 1 of 1 Type: Cement Casing Start Mix Cmt: 23:07 Disp Avg Rate: 7.00 (bbl/min) Returns: 100 Volume Excess %: 167.00 Start Slurry Displ: 23:07 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl) Meas. From: 130 Start Displ: 00:14 Bump Plug: Y Cmt Vol to Surf: 130.00 (bbl) Time Circ Prior End Pumping: 00:53 Press Prior: 700 (psi) To Cementing: 1.50 End Pump Date: 6/8/2004 Press Bumped: 1,100 (psi) Ann Flow After: N Mud Circ Rate: 252 (gpm) Top Plug: Y Press Held: 10 (min) Mixing Method: Mud Circ Press: 260 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densemeter Mud Data Type: Spud Mud Density: 9.6 (ppg) Vise: ;)5 (s/qt) PVIYP: 23 (cp)/16 (lb/100ft2) Gels 10 sec: 5 (lb/100ft2) Gels 10 min: 10 (lb/100ft2) Bottom Hole Circulating Temperature: ("F) Bottom Hole Static Temperature: ("F) Displacement Fluid Type:Mud Density: 9.6 (ppg) Volume: 228.40 (bbl) Stage No: 1 Slurry No: 1 of 4 Slurry Data Fluid Type: FLUSH Description: Biozan water w/ nut plug Class: Purpose: Flush & marke Slurry Interval: (ft) To: (ft) Cmt Vol: 40.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk) Mix Water: (gal) Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (OF) Compressive Strength 1: (OF) (psi) Free Water: (%) Temperature: (OF) Compressive Strength 2: ("F) (psi) Fluid Loss: (cc) Temperature: (OF) Fluid Loss Pressure: (OF) Printed: 8/16/2005 7:03:22 AM e e ConocoPhillips Alaska Page 2 of 3 Cementing Reþort Legal Well Name: CD2-31 PB 1 Spud Date: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 1 Report Date: 6/7/2004 Event Name: ROT - DRJLLlNG Start: 6/5/2004 End: 7/2/2004 Stage No: 1 Slurry No: 2 of 4 Slurry Data Fluid Type: Spacer Description: MUDPUSH XL Class: Purpose: SPACER Slurry Interval: (ft) To: (ft) Cmt Vol: 44.0 (bbl) Density: 10.50 (ppg) Yield: (ft3/sk) Mix Water: (gal) Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (OF) Compressive Strength 1: ("F) (psi) Free Water: (%) Temperature: (OF) Compressive Strength 2: ("F) (psi) Fluid Loss: (cc) Temperature: ("F) Fluid Loss Pressure: (OF) Stage No: 1 Slurry No: 3 of 4 Slurry Data Fluid Type: LEAD Description: ASLite Class: Purpose: PRIMARY Slurry Interval: 2,802.00 (ft)To: (ft) Cmt Vol: 394.0 (bbl) Density: 10.70 (ppg) Yield: 4.28 (ft3/sk) Mix Water: 20.00 (gal) Water Source: lake Slurry Vol507 (sk) Water Vol: 243.0 (bbl) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi) Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi) Fluid Loss: (cc) Temperature: (OF) Fluid Loss Pressure: ("F) Stage No: 1 Slurry No: 40f4 Slurry Data Fluid Type: TAIL Description: Class: G Purpose: PRIMARY Slurry Interval: 3,302.00 (ft)To: 2,802.00 (ft) Cmt Vol: 50.0 (bbl) Density: 15.80 (ppg) Yield: 1.17 (ft3/sk) Mix Water: 5.00 (gal) Water Source: lake Slurry Vol:240 (sk) Water Vol: 30.0 (bbl) Other Vol: () Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi) Free Water: (%) Temperature: (OF) Compressive Strength 2: (OF) (psi) Fluid Loss: (cc) Temper3ture: (OF) Fluid Loss Pressure: (OF) Stage No: 1 Slurry No: 4 of 4 - Additives Trade Name Type Concentration Units Liauid Conc. Units D-46 DEFOAMER 0.2C %BWOC D-65 DISPERSANT 0.3C %BWOC S1 ACCELERATOR 1.0C %BWOC Printed: 8/16/2005 7:03:22 AM e e ConocoPhillips.Alaska Cementi ngReport Page 3 of 3 Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Report #: Start: 1 6/5/2004 Spud Date: 6/5/2004 Report Date: 6/7/2004 End: 7/2/2004 Casing Test Shoe Test Liner Top Test Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: N Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N LoglSurvey Evaluation Interpretation Summary CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry ( AS lite3) @ 10.7 ppg - Observed nut plug marker @ sharkers w/375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail slurry Mixed & pumped Tail slurry (G w/ .2% 0046, .3% D065, & 1 % S002) @ 15.8 ppg - Dropped top plug w/20 bbls water f/ Dowell - Switch to rig pumps & displace cement w/228.4 bbls 9.6 ppg mud @ 7 B/M f/420 to 790 psi - slowed pumps to 3 1/2 B/M for last 18.4 bbls of displacment - Bumped plug w/1100 psi - CIP @ 0053 hrs. - Full circulation throughout w/130 bbls. 10.7 ppg cement reutrns to surface Printed: 8/1612005 7:03:22 AM e e Page 1 of 3 ConocoPhiUips Alãskä,lnc. DailyDrHlingR~port . WELL NAME JOB NUMBER EVENT CODE 24 HRS PROG TMD I TVD I DFS I REPT ~O. ¡DATE CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 6/7/2004 SUPERVISOR I RIG NAME & NO. . FIELD NAME I OCS NO. AUTH MD DAILY TANG ¡CUM. TANGO D. Burley / D. Mickey Doyon Driilina Inc 19 ALPINE 18,682.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD Prep to test BOPE 0 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD Test BOPE- PU DP - MU BHA#2 - RIH - FIT - Drill 8 1/2" hole 6/7/2004 205,298 581,605 LITHOLOGY I JAR iiRS OF SERVICE I BHA HRS SINCE INSP I LEAKOFF AFE AUTH. 10034643 LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST 6/7/2004 3,262.53 61.257 266.810 9.625 (in) (iù 3,302.0 (ft) 7.000 (in) (iù 13,737.0 (ft) DENSITY(ppg) 9.60 I PP I ECDI MUD DATAl DAILY COST 1 0 I CUM COST I 0 FV PVIYP GELS I WLJHTHP I FCIT.SOL OILJWAT I %Sand/MBT I Ph/pM I Pf/Mf CI Ca I H2S I LIME I ES 300 34/82 42/95 I 7.4/ I 3/ / I 0.5/27.5 I 8.7/ ¡ 0.01/0 20 1 I I BHA NO. I 1 I BHA I HOLE CONDITIONS I BIT NO. I 1 BHA WT.BELOW JARS I STRING WT. UP STRING WT. DN STRING WT. ROT I TORQUE / UNITS BHA LENGTH 24,568 I 140 120 130 I 8,500 ft-Ibf 977.28 ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. CONN SIZE CONN TYPE Bit 1 1.00 12.250 4.500 Mud Motor 1 31.10 8.000 5.000 Sub - Float 1 2.47 8.000 2.870 Stabilizer 1 5.92 8.150 2.875 Crossover - Non Mag 1 2.44 8.140 2.875 MWD 1 9.17 8.020 3.500 MWD 1 8.70 8.020 1.920 MWD 1 9.90 8.090 1.900 Sub - Bottom Hole Orienting 1 3.00 8.100 2.813 Drill Collar - Non Mag 1 31.03 2.812 2.875 Drill Collar - Non Mag 1 31.03 8.062 2.880 Drill Collar - Non Mag 1 30.80 8.062 2.880 Crossover 1 3.02 6.750 2.780 Drill Pipe - Heavy Wgt 3 89.85 5.000 3.000 Jars 1 32.70 6.130 2.500 Drill Pipe - Heavy Wgt 23 685.15 5.000 3.000 BITS BIT / RUN SIZE I MANUF. 1 TYPE I SERIAL NO. I JETS OR TFA I DEPTH IN DATE IN I I-O·D-L-B-G-O-R 1/ 1 12.250 I HUGHES-CHR I MX-C1 15044528 I 12/16/16/18// I 114.0 6/5/20041 1-1-WT-A-E-1-NO-TD BIT OPERATIONS BIT / RUN WOB I RPM I GPM I PRESS PBIT HRS I 24HrDIST I 24Hr ROP I CUM HRS CUM DEPTH I CUM ROP 1/ 1 20/30 I /80 I 656 I 2,600 673 1.04 I 149.0 I 143.27 I 21.56 3,198.0 I 148.33 SURVEY DATA M.D. I INCL. I AZIMUTH I T.V.D.· I N/S CUM ¡EIW CUM SECTION M.D. I INCL.I AZIMUTH T.V.D. I N/S CUM ¡EIW CUMI SECTION 3,209.941 60.9271 268.03012,319.171 -59.691-1,807.4 1,678.38113,262.531 61.2571 266.810 2,344.60 I -61.761-1,853.411,720.90 PUMP I HYDRAULIC DATA NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q(gpm) PRESS. (psi) TOTALQ KILL SPM / PRESSURE 1 Continental Emsco 12.000 6.000 75 317.26 2,600 655.67 2 Continental Emsco 12.000 6.000 80 338.41 2,600 655.67 Printed: 8/16/2005 7:02:23 AM e e Page 2 of 3 ConocoPhilUps Alaska, Inc. Daily ÐriUingReport WELL NAME I JOB NUMBER I EVENT CODE 124 HRS PROG ITMD JTVD jDFS IREPT NO. I DATE CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 3 I 6/7/2004 OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 01:15 1.25 DRILL P DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD WOB 20/30 k RPM 80 GPM 650 @ 2500 psi String wt. PU 140 SO 120 Rot. 130 Torque on/off btm - 8,500/7,500 ft. Ibs. ADT -1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs. 01:15 02:30 1.25 DRILL P CIRC SURFAC CBU @ 650 gpm / 2400 psi / 80 rpm, pumped 40 bbls low vis sweep and circ hole clean. 02:30 04:15 1.75 DRILL P WIPR SURFAC Backream from 3312' to 2270' - 400 gpm /1120 psi /80 rpm. Circ BU to clean hole while Backreaming from 2270' to 2175'. 04:15 05:30 1.25 DRILL P WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm /1100 psi /80 rpm. CBU on last stand to clean up hole. 05:30 06:30 1.00 DRILL P WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'. 06:30 08:00 1.50 DRILL P CIRC SURFAC CBU - 675 gpm / 2600 psi / 80 rpm, pumped 40 bblls high vis sweep and circ hole clean. Flow check well, static. 08:00 09:00 1.00 DRILL P TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-8K over, began pulling tight @ 1650'.Worked up to 1640' with several attempts to 50k over. 09:00 11:00 2.00 DRILL Np DH TRIP SURFAC Backream from 1670' to 970' - 500 gpm /1400 psi /80 rpm. CBU on last stand - heavy cuttings load back. Flow check well, static. 11:00 14:15 3.25 DRILL P PULD SURFAC Stand back hwdp and flex collars - lay down UBHO, mwd, stab, motor and bit. Clean up trip mess and clear tools from rig floor. 14:15 15:15 1.00 CASE P RURD SURFAC RU to run 9 5/8" surface casing 15:15 15:30 0.25 CASE P SFTY SURFAC Held PJSM with crew. 15:30 21:00 5.50 CASE P RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. (BakerLoc 1 st I four connections - fill pipe - circ & check floats) - 36 jts. (40 total) to 1624' - Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jl. - Land casing w/ FMC fluted hanger w/ shoe @ 3302' - FC @ 3214' 21:00 22:30 1.50 CEMENTF CIRC SURFAC Rig down casing equipment - RU cmt head & lines - Circulate & condition for cement job - ICP 300 psi @ 3 B/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125 22:30 00:00 1.50 CEMENT F PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water w/ nut plug for marker w/ rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry (AS Iite3) @ 10.7 ppg - Observed nut plug marker @ sharkers w/ 375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail slurry 24 HR SUMMARY: Drill 12 1/4" hole f/3162' to 3312' MD - Pump sweep & circulate hole clean - Wiper trip to 1670' -RIH - pump sweep and circ clean- POOH, lay down BHA - RU and Run 9 5/8" casing.- Cmt csg. PERSONNEL DATA COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhillips Company 1 Halliburton - Sperry-Sun 2 Fairweather E&P Service 1 Halliburton - Sperry-Sun 1 Doyon Drilling Inc 27 M-I Drilling Fluids 3 Arctic Catering Inc. 5 Swaco 4 Dowell 2 FMC Corporation Wellhe 1 Halliburton - Sperry-Sun 2 Printed: 811612005 7:02:23 AM e e Page 3 of 3 ConocoPhiUips Alaska,lnc. Daily DriUing Report WELL NAME I JOB NUMBER! EVENT CODE 24 HRS PROG ·!TMD ITVD DFS I REPT ~O. JDATE CD2-31 ODR 149.0 3,312.0 2,368.0 2.25 6/7/2004 MATERIALS 1 CONSUMPTION ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND Fuel gals 1,344 -3,815 Water, Potable bbls 120 -360 Water, Drilling bbls 350 -3,370 Fuel, Camp gals RESERVOIR AND INTERVAL DATA RESERVOIR NAME I ZONE I TOP BASE I COMMENTS CD2-12 I CD2-31 I 933 3.5 11440 Printed: 8/16/2005 7:02:23 AM ·--- PRESSURE INTEGRITY TEST CONOCOPHILLlPS Alaska, Inc. Well Name: I CD2-31 I Rig: Doyon 19 Date: 6/9/2004 Volume Input Volume/Stroke Pump Rate: Drilling Supervisor: Burley / Mickey Pump used: I #2 Mud Pump I... Strokes .... 0.1000 Bbls/Strk .... 6.0 Strk/min ... Type of Test: I OpenholeTest LOT/FIT I... Pumping down I annulus and DP. I... Casin Test Pressure Integrity Test Hole Size: 18-1/2" I... Casing Shoe Depth I I Hole Depth PumpinQ Shut-in Pumping Shut-in RKB-CHF:I 36.71Ft 3,302 IFt-MD 2,367 Ft-TVD I 3.332 I Ft-MD I 2,378IFt-TVD Strks psi Min psi Strks psi Min psi Casina Size and DescriDtion: 19-5/8" 36#/Ft J-55 BTC 1...1 0 0 0 2500 0 0 0 800 Casino Test Pressure InteoritvTest 2 50 1 2500 2 60 0.25 650 Mud Weight: 9.6 ppg Mud Weight: 9.5 ppg 4 150 2 2500 4 205 0.5 610 Mud 10 min Gel: 13.0 Lb/100 Ft2 Mud 10 min Gel: 13.0 Lb/100 Ft2 6 300 3 2500 6 400 1 580 Test Pressure: 2,500 psi Rotating Weight: 115.000 Lbs 8 500 4 2500 8 600 1.5 570 Rotating Weight: 75,000 Lbs Blocksrrop Drive Weight: 75,000 Lbs 10 700 5 2500 10 750 2 560 Blocksrrop Drive Weight: 75,000 Lbs Desired PIT EMW: 18.0 ppg 12 900 6 2500 12 850 2.5 55 Estimates for Test: 2.4 bbls Estimates for Test: 1046 psi 1 bbls 14 1100 7 2500 14 870 3 550 1"'[ ... 16 1240 8 2500 16 900 3.5 545 EMW = Leak-off Pressure + Mud Weight = 850 2367 + 9.5 PIT 15 Second 18 1400 9 2500 18 4 540 0.052 x TVD 0.052 x Shut-in Pressure, psi 20 1550 10 2500 20 4.5 540 EMW at 3302 Ft-MD (2367 Ft-TVD) = 16.4 ppg 650 22 1700 15 2500 5 540 3000 ~,tO ~d~"g œ" ~1~1 24 1900 20 2500 5.5 540 --~--- ._...~------ -- of test pressure. 26 2050 25 2500 - 6 540 -- 28 2250 30 2500 6.5 535 -- -- 2500 -- -------- .. -- .."..,,,. .."...". . 30 2450 -- ---- 7 530 .----------.--. -- , .._--~ 31 2500 7.5 520 Æ -------- ----- --- AC"·- -------_._-~ ~- -~ -- .-- 8 515 2000 -- --- .I' I----- -_._~ - -- w "" .-----.-- 8.5 515 a::: ~- , -_o- f----- r-- -. -~'-_.. 9 515 -- f---------- r--. --- ::;) ..,.. -- I--~- 9.5 U) 1500 r--------- ,---- ----~-- .-- 515 U) .- -- 10 510 w f- a::: - -- f--- Q. .I" - -- 1000 ¡-----. "" -- -- I-- ., - -- I-- jjJf .- --- -- -- -_.'_.._--~ -~ rt\::: --- - -- \ f ..., I \:.- . 500 .-- -I" , ( . ~ -- -- JJ ,"11& 11\ ~ -- -- ".", "'- Il"'Yi -.---.- ~ " í\ -- 0 0 1 2 3 4 0 5 10 15 20 25 30 Barrels Shut-In time, Minutes Volume Volume Volume Volume .......CASING TEST -LEAK-OFF TEST 0 PIT Point Pumped Bled Back Pumped Bled Back 3.1 Bbls IBbls 2.0 Bbls Bbls Comments: Tested 9 5/8" casing after bumping plugs on cement job. e e Conoc6Phillips Casing Detail 7" Casina Well: Date: CD2-31 6/19/2004 DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to Landing Ring 34.84 FMC Gen V Hanger 2.40 34.84 Jts 3 to 321 319 Jts 7" 26# L-80 BTCM Csg 13471.62 37.24 Davis Lynch Float Collar 1.30 13508.86 Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 86.15 13510.16 Ray Oil Tools "Silver Bullet" Float Shoe 2.10 13596.31 13598.41 TD 8 1/2" Hole 13608.00 Total Centralizers: 94 Straight blade centralizer one per jt on jts # 1-14 Straight blade centralizer one per jt on jts. # 243, 244, 245 Straight blade centralizer one per jt on every other joint Starting @ # 247 to # 279 Straight bla.de centralizer 2 per jt on jts 282 - 303 wI stop collars Straight blade centralizer one per jt on jts # 303 - 319 ** - 330 joints in shed - 321 total jts. to run Last 9 jts. out Use Best-a-Life 2000 pipe dope Remarks: Up Wt - 350.+ k Dn Wt - 145'k Block Wt - 75k , ** Did not install stop rings on jts #304 - 319 due to csg trying to stick in hole. Only 1 cent per jt. Supervisor: D. Lutrick / L. Hill e e ConocoPhillips Alaska Page 1 of 3 ; Cementing Report Legal Well Name: CD2-31 PE.1 Spud Date: 6/5/2004 Common Well Name: CD2-31 PB1 Report #: 3 Report Date: 6/19/2004 Event Name: ROT - DRILLING Start: 6/5/2004 End: 7/2/2004 Cement Job Type: Primary Primary Saueeze Open Hole Saueeze Casino Plug Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 13,598 (ft) sa TMD: (ft) TMD Set: Top Set: (ft) Date Set: 6/19/2004 sa Cate: Date Set: BTM set: (ft) Csg Type: Production Casing sa Týpe: Csg Type: Plug Date: Csg Size: 7.000 (in.) sa TMD: Plug Type: sa Date: Drilled Out: Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: Dowell Schlumberger Cementer: Jim Thompson Pipe Movement: Pipe Movement Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Rec Time Start: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs) Stage No: 1 of 1 Type: Cement Casing Start Mix Cmt: 03:38 Disp Avg Rate: 7.00 (bbl/min) Returns: 100 Volume Excess %: 40.00 Start Slurry Displ: 03:38 Disp Max Rate: 7.00 (bbl/min) Total Mud Lost: (bbl) Meas. From: N/A Start Displ: 03:50 Bump Plug: Y Cmt Vol to Surf: (bbl) Time Circ Prior End Pumping: 05:05 Press Prior: 900 (psi) To Cementing: End Ij'ump Date: 6/19/2004 I Press Bumped: 1,400 (psi) Ann Flow After: N Mud Circ Rate: 294 (gpm) Top Plug: Y I Press Held: 1,400 (min) Mixing Method: Tub Mud Circ Press: 1,000 (psi) Bottom Plug: Y Float Held: Y Density Meas By: Densometer Mud Data Type: Non-Disp. LS Density: 9.8 (ppg) Visc: 40 (s/qt) PVIYP: 8 (cp)/16 (lb/100ft2) Gels 10 see: 8 (lb/100ft2) Gels 10 min: 11 (lb/100ft2) Bottom Hole Circulating Temperature: (OF:, Bottom Hole Static Temperature: (OF) Displacement Fluid Type:Mud Density: 9.8 (ppg) Volume: 516.00 (bbl) , Stage No: 1 Slurry No: 1 of 3 Slurry Data Fluid Type: FLUSH Description: CW 1 00 Class: Purpose: Chemical was Slurry Interval: (ft) To: (ft) Cmt Vol: 20.0 (bbl) Density: 8.30 (ppg) Yield: (ft3/sk) Mix Water: (gal) Water Source: lake Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: ("F) Compressive Strength 1: (OF) (psi) Free Water: (%) Temperature: ("F) Compressive Strength 2: ("F) (psi) Fluid Loss: (cc) Temperature: (OF) Fluid Loss Pressure: ("F) .' , Printed: 6/16/2005 7:03:47 AM e e ConocoPhillips Alaska Cerraenting.Report Legal Well Name: CD2-31 PB1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Slurry Data Fluid Type: FLUSH Slurry Interval: (ft) To: (ft) Water Source: Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Slurry Data Fluid Type: TAIL Slurry Interval: 13,598.00 (ff)o: Water Source: lake water Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Trade Name D-65 B-155 D-46 0-167 Report #: Start: 3 6/5/2004 Stage No: 1 Slurry No: 2 of 3 Page 2 of 3 Spud Date: 6/5/2004 Report Date: 6/19/2004 End: 7/2/2004 Description: MUDPUSH XL Class: Cmt Vol: 50.0 (bbl) Density: 10.50 (ppg) Yield: (ff'/sk) Slurry Vol: (sk) Water Vol: (bbl) Other Vol: 0 Temperature: (OF) Temperature: (OF) Temperature: ("F) Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No: 30f 3 Description: 12,126.00 (ft~mt Vol: 47.0 (bbl) Slurry Vol230 (sk) Temperature: (OF) Temper:3ture: ("F) Temperature: (OF) Temp (OF) (OF) Class: G Density: 15.80 (ppg) Yield: 1.16 (ft3/sk) Water Vol: 27.8 (bbl) Other Vol: 0 Time Compressive Strength 1: Compressive Strength 2: Stage No: 1 Slurry No: 3 of 3 - Additives Tvpe DISPERSANT retarder DEFOAMER Fluid loss .. I Concentration Units 0.3C %BWOC 0.01 %BWOC 0.2C %BWOC OAC %BWOC Temp (OF) (OF) Liquid Conc. ! Purpose: SPACER Mix Water: (gal) Foam Job: N Pressure (psi) (psi) Purpose: PRIMARY Mix Water: 5.09 (gal) Foam Job: N Pressure (psi) (psi) Units Printed: 811612005 7:03:47 AM e e ConocoPhillips Alaska Cementing Report Page 3 of 3 Legal Well Name: CD2-31 PE1 Common Well Name: CD2-31PB1 Event Name: ROT - DRILLING Report #: Start: 3 6/5/2004 Spud Date: 6/5/2004 Report Date: 6/19/2004 End: 7/2/2004 . Casing Test Shoe Test Liner Top Test Test Press: (psi) For: (min) Cement Found between Shoe and Collar: Pressure: (ppge) Tool: Open Hole: (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: Tool: Tool: Log/Survey Evaluation Interpretation Summary CBL Run: Under Pressure: (psi) Bond Quality: Cet Run: Bond Quality: Temp Survey: Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: Number of Remedial Squeezes: Remarks Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug. Check floats OK. Test csg to 3500 psi. Printed: 811612005 7:03:47 AM e e Page 1 of 1 ConocoPhillips Alaska, Inc. Daily Drilling Report WELL NAME JOB NUMBER I EVENT CODE 124 HRS PROG TMD I TVD I DFS REPT NO. DATE CD2-31 ODR 13,608.0 7,342.0 13.25 14 6/18/2004 SUPERVISOR RIG NAME & NO. FIELD NAME / OCS NO. AUTH MD _IDAlLYTAN~ CUM. TANG Donnie Lutrick I Larry Hil Doyon Drilling Inc 19 ALPINE 18,682.0 0 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT WIO MUD CUM INTANG WI MUD Rig down after cement job. 0 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST WI MUD Run 7". Cement 7". Test BOP. 6/14/2004 87,503 2,379,807 LITHOLOGY JAR HRS OF SERVICE BHA HRS SINCE INSP I LEAKOFF AFE AUTH. FINE SAND 16.38 10034643 LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING LAST BOP PRES TEST 6/16/2004 13,533.65 80.320 318.950 9.625 (in) @ 3,302.0 (ft) 7.000 (in) @ 13,737.0 (ft) 6/14/2004 DENSITY(ppg) 9.80 I PP I ECD19.80 IMUD DATAl DAILY COST I 0 CUM COST 0 FV PVNpl GELS WUHTHP FCiT.SOL OIUWAT I %SandIMBT I Ph/pM I Pf/Mf I CI I Ca H2S I LIME I ES 42 7/20 I 8/12 4.0/7.2 11 I I 0.2118.0 I 9.01 I 0.05/2 I I 4 I I I OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 00:00 02:15 2.25 CASE P RUNC INTRM1 Rih wI 7" csg from 250' to 3261'. 02:15 02:45 0.50 CASE P CIRC INTRM1 Circ 1 csg volume at 5 bpm at 310 psi. 02:45 03:30 0.75 CASE T EQIP OTHR INTRM1 Change out Franks fill up tool. Cup was leaking. 03:30 07:45 4.25 CASE P RUNC INTRM1 RIH wI 7" csg from 3261' to 7590'. 07:45 08:45 1.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. On wt - 120k. 08:45 13:00 4.25 CASE P RUNC INTRM1 RIH wI 7" csg from 7590' to 11,816'. 13:00 15:00 2.00 CASE P CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. On wt - 145 k. 15:00 00:00 9.00 CASE P RUNC ·INTRM1 RIH wI 7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight 460 K up and All of weight down to make a few feet at a time. Attempts to circulate tried to pack off. 24 HR SUMMARY: Ran casing from 250' to 13515'. PERSONNEL DATA COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhillips Company 1 Halliburton - Sperry-Sun 2 Fairweather E&P Service 1 Halliburton - Sperry-Sun Doyon Drilling Inc 27 M-I Drilling Fluids 3 Arctic Catering Inc. 5 Swaco 4 Dowell 2 FMC Corporation Wellhe 1 Halliburton - Sperry-Sun 2 I MATERIALS I CONSUMPTION ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND Fuel gals 750 9,075 Water, Potable bbls 120 680 Water, Drilling bbls 250 820 Fuel, Camp gals 2,080 RESERVOIR ANDINTERVALDAT A RESERVOIR NAME I ZONE I TOP BASE I COMMENTS CD2-36 I Cd2-31 1 20 2 11470 Printed: 6/16/2005 7:02:43 AM e e Page 1 of 2 CD2-31 SUPERVISOR I RIG NAME & NO. Donnie Lutrick I Larry Hill Doyon Drilling Inc 19 CURRENT STATUS ConocoPhillipsAlaska, Inc. Daily DrilHngReport JOB NUMBER ¡EVENT CODE 124 HRS PROG TMD I TVD ¡ DFS ODR 13,608.0 I 7,342.0 I 14.25 I FIELD NAME I OCS NO. AUTH MD DAilY TANG 1 ALPINE 18,682.0 0 ACCIDENTS LAST 24 HRS. ? DAILY INT WIO MUD IREPT NO. 10ATE 15 16/19/2004 ¡CUM. TANGO CUM INTANG WI MUD o CUM COST WI MUD 2,829,390 WEll NAME Circulating prior to doing FIT. 0 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL FIT. Change out mud system to MOBM and drill. 6/14/2004 449,583 LITHOLOGY ¡JAR HRS OF SERVICE BHA HRS SINCE INSP IlEAKOFF AFE FINE SAND 16.38 10034643 LAST SURVEY: DATE TMD INC AZIM I LAST CASING NEXT CASING 6/16/2004 13,533.65 80.320 318.950 i 7.000 (in) @ 13,598.0 (ft) 4.500 (in) CW DENSITY(ppg) 9.80 I PP I ECD 19.80 I MUD DATAl DAlLYCOST I 0 FV PVlYP GELS WUHTHP I FC/T.SOL OIUWAT I %SandlMBT I Ph/pM I Pf/Mf I 40 8116 8/11 5.2/7.2 I 11 I I 0.2/15.0 I 9.01 I 0.05/2 I AUTH. LAST BOP PRES TEST 18,682.0 (ft) 6/19/2004 I CUM COST I 0 CI I Ca I H2S I LIME I ES I 4 I ¡ I BHA NO. I 4 I BHAI HOLE CONDITIONS I BIT NO. I 4 BHA WT.BELOW JARS STRING WT~ UP STRING WT. ON I STRING WT. ROT I TORQUE I UNITS BHA LENGTH I I 376.78 ITEM DESCRIPTION NO JTS LENGTH O~D. 1.0. CONN SIZE CONN TYPE Bit 1 0.75 6.125 2.250 Motor 1 32.48 4.974 2.794 6" Stab 1 5.53 4.790 2.256 Sub - Float 1 2.40 4.625 2.250 MWD 1 8.56 4.720 2.625 MWD 1 24.47 I 4.750 1.250 MWD 1 10.86 4.700 1.250 MWD 1 11.01 4.630 2.815 NM Flex DC's 3 93.84 4.700 2.250 Crossover 1.16 4.770 2.625 3 X HWDP 3 91.95 3.500 2.060 Jar DNT 32.46 4.750 2.000 2 X HWDP 2 61.31 3.500 2.063 BIT I RUN 41 4 BITS SIZE I MANUF. I TYPE I SERIAL NO. I JETS OR TFA 6.125 I HUGHES-CHR IHC 306 17102089RB I 12/12/13/13/13/13 I DEPTH IN DATE IN I I-O-D-L-B-G-O-R 113,608.0 6/19/20041 1-1-CT-M-D-I-EC-TD BIT! RUN BIT OPERATIONS WOB I RPM J GPM I PRESS I P BIT I HRS I 24Hr DIST I 24Hr ROP CUM HRS CUM DEPTH I CUM ROP FROM TO 00:00 00:30 HOURS 0.50 CODE CASE P TROUBLE SUB RUNC OPERATIONS SUMMARY PHASE INTRM1 DESCRIPTION Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and landed casing @ 13598'. Rigged down fill up tool and made up cement head and lines. Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure and flow stabilized. Final circulating pressure 1000 PSI @ 7 BPM with full returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back on hanger. PJSM for cement job. Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug with 1400 PSI. Check floats OK. CIP @ 0505Hrs. 6/19/04. 00:30 01:00 0.50 CASE P RURD INTRM1 01:00 03:15 2.25 I CEMENT F CIRC INTRM1 I I I 03:15 05:15 2.00 CEMENT F PUMP INTRM1 Printed: BJ16/2005 7:02:58 AM e e Page 2 of 2 ConocoPhillips Alaska, Inc. Dêlily DrilUngReport WELL NAME I JOB NUMBER EVENT CODE 124 HRS PROG TMD ¡TVD IDFS I REPT NO. DATE CD2-31 ODR 13,608.0 7,342.0 14.25 15 6/19/2004 OPERATIONS SUMMARY FROM TO HOURS CODE TROUBLE SUB PHASE DESCRIPTION 05:15 06:00 0.75 CASE P MIT INTRM1 Rigged up and tested casing 3500 PSI for 30 miniutes. 06:00 06:45 0.75 CASE P RURD INTRM1 Rigged down cement and casing tools. 06:45 07:45 1.00 CASE P DEQT INTRM1 Laid down landing joint. Installed and tested packoff. 07:45 08:45 1.00 WELCTL F EQRP INTRM1 Changed out rams from 7" to VBR. 08:45 13:00 4.25 WELCTL F BOPE INTRM1 Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke lines, kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing tests. Pull test plug and install wear bushing. 13:00 13:30 0.50 DRILL P RIRD INTRM1 Picked up bales and elevators. 13:30 17:30 4.00 DRILL P PULD INTRM1 Made up BHA and RIH. Shallow tested MWD. 17:30 20:30 3.00 DRILL P ., PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'. 20:30 00:00 3.50 DRILL P TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'. 24 HR SUMMARY: Ran and landed casing at 13598'. Circulated. Cemented casing. Tested casing to 3500 PSI. Rigged down tools and tested BOP. Made up and RIH with BHA and 150 Jts. DP from pipe shed. RIH with DP from derrick to 12500'. PERSONNEL DATA COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS ConocoPhillips Company 1 Halliburton - Sperry-Sun Fairweather E&P Service 1 M-I Drilling Fluids 3 Doyon Drilling Inc 27 Swaco 4 Arctic Catering Inc. 5 FMC Corporation Wellhe 1 Dowell 2 ASRC Energy Services ( 2 Halliburton - Sperry-Sun 2 Epoch Well Services Inc 2 Halliburton - Sperry-Sun 2 MATERIALS I CONSUMPTION ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND Fuel gals 560 8,515 Water, Potable bbls 120 960 Water, Drilling bbls 950 1,070 Fuel, Camp gals 2,080 RESERVOIR AND INTERVAL DATA RESERVOIR NAME ZONE TOP BASE COMMENTS CD2-36 Cd2-31 1449 3.5 1420 CD2-31 CD2-31 392 4.3 1400 Printed: 8/16/2005 7:02:58 AM PRESSURE INTEGRITY TEST CONOCOPHILLlPS Alaska, Inc. Nell Name: I C02 -31 TRig: Doyon 19 Date: 6/19/2004 Volume Input Pump Rate: Drilling Supervisor: Lutrick I Hill Pump used: I Cement Unit I.... ~ ~ 0.8 Barrels Bbls/Strk Bbl/min ..... Type of Test: \ Annulus Leak Off Test for Disposal Adequacy I ... I Pumping down I annulus. I... Casin Test Pressure IntearitvTest Hole Size: 18-1/2" I... Casina Shoe Depth I I Hole Depth Pumping Shut-in Pumping Shut-in RKB-CHF: I 34.8 Ft I 3,302 1Ft-MOl 2,367IFt-TVD I 12,1261Ft-MD 6,8281 Ft-TVD I Bbls psi Min psi Bbls psi Min psi Casina Size and Description: 19-5/8" 36#/Ft J-55 BTC I.... 0.5 25 0 480 Chanaes for Annular Adeauacv Test Pressure IntearitvTest 1 56 0.25 460 )uter casing shoe test results in comments Mud Weight: 9.8 ppg 1.5 86 0.5 450 Description references outer casing string. Inner casing 00: 7.0 In. 2 116 1 444 i¡ze is that drilled below outer casing. 2.5 147 1.5 444 ;timated TOC for Hole Depth. 3 177 2 444 Enter inner casing OD at right Desired PIT EMW: 15.5 ppg 3.5 212 2.5 439 Estimates for Test: 702 psi 0.8 bbls 4 242 3 439 1...1 ... 4.5 268 3.5 439 EMW = Leak-off Pressure + Mud Weight = 606 2367 + 9.8 PIT 15 Second 5 298 4 439 0.052 x TVD 0.052 x Shut-in Pressure, psi 5.5 328 4.5 434 EMW at 3302 Ft-MD (2367 Ft-TVD) = 14.7 460 6 353 5 434 1000 - 6.5 384 5.5 429 7 409 6 429 ~---_._- ------- --~_.~---- f----~-~ ~~- -- e-- ~ ~0- 7.5 434 6.5 429 --~-- 8 464 7 429 r\~ ~ 8.5 485 7.5 424 Ah. . .C ----- ---~_._- _c. -- -_._~- --- ---1 ~, - 9 510 8 424 Ll j}-- ....\, , IiiIi\ ~ 9.5 540 8.5 424 w --- 0::: -' ........ ,/ 10 560 9 419 ::) ~- (/) 500 f--- - " -.- -----~ ----- -- 10.5 586 9.5 419 (/) ..¡; .. \"'", 11 606 10 419 w . ,.. 0::: ".- -- c- 11.5 555 ---- ,¡r k~ ~ Q. ~ f"2.. .-::1~ 12 520 ,.,- -- ~---- ----.--..- ---~ ~ -~ ~Jf 12.5 515 ~ 13 515 -- . ,.. --- ---.-.---.-- -~ , 1;& -\\ < \ 13.5 525 14 530 ... --- --------- --- 14.5 535 0 0 2 4 6 8 10 12 14 16 0 5 10 15 20 25 30 Barrels Shut-In time, Minutes Volume Volume Volume Volume ........CASING TEST _LEAK-OFF TEST 0 PIT Point Pumped Bled Back Pumped Bled Back 0.0 Bbls IBbls 14.5 Bbls ItsDls Comments: 9 5/8 LOT = 16.4 PPG EMW 12/20104 Schlumberger NO. 3287 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay ~,. (b ¡~~' \~- -)If- \q~ ¡.rf> ~ \~ e 0 OQ escnptlon ate ue me rm s ~ L5-05 10662986 RST-SIGMA 01/28/04 1 1 /"?c ?-ð(¡,CY \5~ L3-02 10679068 RST -SIGMA 04/03/04 1 1 ?G-/:J1f L3-02 10900108 RST -SIGMA 10/29/04 1 1 I ~ -/3'( fÞ'\~ L5-05 10674383 RST -SIGMA 10105/03 1 1 It ÌI 7-CXd1 .~ DS 06-23B 10715411 MCNL 06/15/04 1 1 ~ 0'(- m ,vV 02-06A 10621750 SCMT 12/01/03 1 I rt:. -I Ji' -~~ Z-39 10900123 PROD PROF W/DEFT 11/27/04 1 .2l~ -:ztn 1-¡¿ W-17 10889187 TEMPERATURE PROFILE 11/08/04 1 ... Q' _0_ ~ 02-29C 10889185 DOWN HOLE SAMPLE LOG 11/07/04 1 2. 0'1- 05'1 ,~ X-04 10919925 PROD PROF WIDEFT 12/15/04 1 / 79- ðl?-'t '1;%'I¡ W-31 10877807 PROD PROF W/DEFT/GHOST 12/15/04 1 /~/Ycf WII J b # L D D BI r Color p' t CD PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 /þ;ts- / Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, 99503-2 ATTN' eth Date Delivered: . -~r,f-"fIi ¡.. . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Robin Deason 333 West 7ili Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Logs: CD2-31 PBl, /?-~~~ RECEIVED 0rD rì () {';I"04 0D L 0 1...\.1 .. ¡'~¢1¡'"" ("Iii X. Gas Cons, Comrmssíof! \¡?)oilr-.¡C")' ;J __ i.,.~ R.f¡r;\1orage September 14, 2004 AK-MW-3109992 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of Rob Kalish, Sperry-Sun, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted CD Rom with verification listing. API#: 50-103-20493-70. ~ .~ 11/o~ RECEIVE~ . ~o <f-o 'ðl- /zr;'i~ C;r.D :) p 00 ì4 vt.....l t.. ¡) I: 0 'l1¡jska Oil & GM C . C '. WELL LOG TRANSMITTAL d~ ons. ommiSS!Of Anr.horage To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: 1tub~1f DUi:18ft 333 West 7tll Avenue, Suite 100 Anchorage, Alaska 99501-3539 September 14,2004 RE: MWD Formation Evaluation Logs: CD2-3], AK-MW-3109992 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Rob Kalish, Speny-Sun, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-103-20493-00. d~J.aJ~ I ð¡;- f t( . ~ ConocoPhillips . G. C. Alvord Alpine Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360 Phone: 907-265-6120 September 29,2004 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West ¡th Avenue Suite 100 Anchorage, Alaska 99501 RECEIVED SEP 2 9 2004 Alaska Oil & Gas Cons. Commission Anchorage Subject: Well Completion Report for CD2-31 / CD2-31 PB1 (APD 204-082) Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the recent drilling operations on the Alpine well CD2-31 / CD2-31 PB1. If you have any questions regarding this matter, please contact me at 265-6120. Sincerely, 4 c-~ 0tZ- G. C. Alvord Alpine Drilling Team Leader CPAI Drilling and Wells GCA/skad OR\G\NAL · STATE OF ALASKA .. ALA Oil AND GAS CONSERVATION COM~ON R,EtË'VED tH,P 2 9 2004 WELL COMPLETION OR RECOMPLETION REPORT A ",-.0(1 1a. Well Status: Oil 0 Gas U Plugged 0 Abandoned 0 Suspended 0 WAG 0 1b}Wèû:tilaM!' ';¡e,""'" - .' 20AAC 25.105 20AAC 25.110 Development 0" nc!1OfªWfuratory 0 GINJ 0 WINJ 0 WDSPL 0 No. of Completions _ Other _ Service 0 Stratigraphic Test 0 2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number: ./ ConocoPhillips Alaska, Inc. or Aband.: July 2,2004 204-082 I 3. Address: 6. Date Spudded: 13. API Number. P. O. Box 100360, Anchorage, AK 99510-0360 June 5, 2004 , 50-103-20493-00 I 50-103-20493-70 4a. Location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number: / CD2-31I CD2-31 PB1 Surface: 1875' FNL, 1526' FEL, Sec. 2, T11N, R4E, UM June 24, 2004 At Top Productive 8. KB Elevation (It): 15. Field/Pool(s): Horizon: 1746' FNL, 1450' FEL, Sec. 4, T11N, R4E, UM 36.9' RKB I 52.8' AMSL Colville River Field Total Depth: 9. Plug Back Depth (MD + TVD): Alpine Oil Pool 2902' FNL, 3804' FEL, Sec. 33, T12N, R4E, UM 18131' MD 17311' TVD 4b. Location of Well (State Base Plane Coordinates): / 10. Total Depth (MD + TVD): 16. Property Designation: / Surface: x- 371713 ,¡ y- 5974483 Zone-4 I 18131' MD 17311' TVD ADL 380075, 387207, ASRCNPR1 TPI: x- 361234 y- 5974798 Zone- 4 11. Depth where SSSV set: 17. Land Use Permit: Total Depth: x- 358947 y- 5978965 Zone-4 SSSV @ 2307' ALK NIA 18. Directional Survey: Yes 0 NoU 19. Water Depth, if Offshore: 20. Thickness of NIA feet MSL Permafrost: 1795' MD 21. Logs Run: G RIRes/Dens/Neu 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING SIZE CEMENTING RECORD PULLED WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE 16" 62.5# H-40 36.9' 109' 36.9' 109' 42" pre-installed 9.625" 36# J-55 36.9' 3302' 36.9' 2364' 12.25" 507 sx AS Lite, 240 sx Class G 7" 26# L-80 36.9' 13598' 36.9' 7339' 8.5" 230 sx Class G 4.5" 12.6# L-80 12688' 18119' 7096' 7311' perf'd pups 1 per 4 jts sidetrack plug from 12745'-13245' 23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET 4.5" I 3.5" 12679' 12629' 13811 '-14850' MD 7348'-7336' TVD * ./ 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 15245'-18073' MD 7325'- 7311' TVD * DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 12745'-13245' 195 sx Class G 7980'-8480' 253 sx Class G (sidetrack plug) . 1 perf'd pup every 4 jts of blank w/(8) 1/2" holes 26. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lilt, etc.) August20,2004 Gas Lift Oil Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 9/4/2004 6 hours Test Period --> 1059 742 0 74% 886 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - API (corr) press. 247 psi 1241 24-Hour Rate -> 3733 3309 0 not available 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". !';:',;c': c;,,· u' ,,' ..._ '1.\ -,~ NONE .2:2. ~'<2.i VE-~i j ¿:; E r:" ORIGI~~I~L -~--_. 0P'G Form 10-407 Revised 12/2003 CONTINUED ON REVERSE f~Bfl ~~ OCT06~ 28. 29. GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None'. CD2-31 Seabee Formation Nanushuk Gamma Ray Shale Kalubik Kuparuk Formation Miluveach Top Alpine 0 Top Alpine C Base Alpine C TO not present 6210' 12271' 12649' 12724' 12810' 12958' 12986' 13110' 18131 ' 3838' 6903' 7027' 7058' 7089' 7135' 7143' 7230' 7311' NIA RECE\VE,Q SEP'2 9 1004 . '"' ''''I· "stOr. . G COilS. \,;om,¡, '" . A\aska 0'\ & as þ.t"Ichorage CD2-31 PB1 TO 13245' 7429' 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Vern Johnson @ 265-6081 Printed Name C. Alvord Signature -A-..( .(),Á.. Title: Phone Alcine Drillina Team Leader 2<.,.s- - (¡, 1"l..O Date ~L (2.- \ ( @e¡.... Prepared by Sharon Allsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRilLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/5/2004 00:00 - 04:00 4.00 MOVE MOVE MOVE Moving rig fl C02-57 to CD2-31 - Move ball mill - PJSM - Move pit & motor complex - Skid derrick & floor over sub - retract feet - move sub off C02-57 - tum tires - lay mats for sub move. 04:00 - 09:00 5.00 MOVE MOVE MOVE Move rig to well slot CD2-31, spot and level subbase. Skid rig floor to drill position - move in pits & motor complexes- spot pipe shed. Hook up sevice lines, highline power on @ 0845 hrs. Accepted rig @ 0900 hrs. 09:00 - 11 :00 2.00 MOVE RURD MOVE NU riser and flowline, take on spud mud and rig up. 11 :00 - 12:00 1.00 MOVE RURD MOVE Move BHA components to rig floor - MU motor and bit. 12:00 - 13:30 1.50 RIGMNT RSRV MOVE Cut and slip drilling line - service rig. 13:30 - 14:30 1.00 MOVE RURD MOVE MU HWDP on top of motor - fill conductor with mud - check for leaks - test mud lines to 3000 psi. - Drill out ice plug and clean out conductor from 40' to 114'. 14:30 - 16:00 1.50 MOVE RURD MOVE MU BHA - scribe tools and initiate MWD tools. 16:00 - 16:15 0.25 MOVE SFTY MOVE Held Pre-Spud meeting with Drilling Crew and Rig Team. 16:15 - 16:30 0.25 MOVE RURD MOVE MU 8" flex collars and wash down to 114'. 16:30 - 00:00 7.50 DRILL DRLG SURFAC Spud well @ 1630 hrs - Drill 12 1/4" hole from 114' to 758' MD -754' TVD WOB 10/25 k RPM 0170 GPM 420 @ 950 psi String wt. PU 110 SO 110 Rot 110 ADT - 3.0 hrs. = ART - .8 hrs. AST - 2.2 hrs. 6/6/2004 00:00 - 12:00 12.00 DRILL DRLH SURFAC Drill 12 1/4" hole from 758' to 2305' MD 1868' TVD WOB 10/35 k RPM 70 GPM 630 @ 1880 psi String wt. PU 135 SO 125 Rot 130 Torque onloff btm - 7,50017,500 Wlbs Total ADT 8.9 hrs = ART - 4.21 hrs AST - 4.69 12:00 - 00:00 12.00 DRILL DRLG SURFAC Drill 12 1/4" hole from 2305' to 3162' MD 2296' TVD WOB 15/35 k RPM 80 GPM 650 @ 2500 psi String wt. PU 135 SO 115 Rot. 125 Torque onloff btm - 9,000/8,000 ft. Ibs. ADT - 8.62 hrs.= ART - 7.35 hrs. AST - 1.27 hrs. 6/7/2004 00:00-01:15 1.25 DRILL DRLG SURFAC Drill 12 1/4" hole from 3162' to 3312' MD 2368' TVD WOB 20/30 k RPM 80 GPM 650 @ 2500 psi String wt. PU 140 SO 120 Rot. 130 Torque on/off btm - 8,50017,500 ft. Ibs. ADT - 1.04 hrs.= ART - 0.7 hrs. AST - 0.34 hrs. 01:15 - 02:30 1.25 DRILL CIRC SURFAC CBU @ 650 gpm 12400 psi I 80 rpm, pumped 40 bbls low vis sweep and circ hole clean. 02:30 - 04:15 1.75 DRILL WIPR SURFAC Backream from 3312' to 2270' - 400 gpm 11120 psi 180 rpm. Circ BU to clean hole while Backreaming from 2270' to 2175'. 04:15 - 05:30 1.25 DRILL WIPR SURFAC Continue to backream from 2175' to 1670' - 400 gpm 11100 psi I 80 rpm. CBU on last stand to clean up hole. 05:30 - 06:30 1.00 DRILL WIPR SURFAC RIH, precautionary wash and ream from 3230' to 3312'. 06:30 - 08:00 1.50 DRILL CIRC SURFAC CBU - 675 gpm 12600 psi 180 rpm, pumped 40 bblls high vis sweep and circ hole clean. Flow check well, static. 08:00 - 09:00 1.00 DRILL TRIP SURFAC POOH on trip tank from 3312' to 1650' with 5-8K over, began pulling tight @ 1650'.worked up to 1640' with several attempts to 50k over. 09:00 - 11 :00 2.00 DRILL TRIP SURFAC Backream from 1670' to 970' - 500 gpm 11400 psi /80 rpm. CBU on last stand - heavy cuttings load back. Flow check well, static. 11 :00 - 14:15 3.25 DRILL PULD SURFAC Stand back hwdp and flex collars - lay down UBHO, mwd, stab, motor and bit. Clean up trip mess and clear tools from rig floor. 14:15 - 15:15 1.00 CASE RURD SURFAC RU to run 9 5/8" surface casing 15:15 - 15:30 0.25 CASE SFTY SURFAC Held PJSM with crew. 15:30 - 21 :00 5.50 CASE RUNC SURFAC Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts. Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 5.50 CASE RUNC SURFAC (BakerLoc 1 st four connections - fill pipe - circ & check floats) . 36 jts. (40 total) to 1624' . Circulate btms up 4 bbls/min @ 260 psi - PU 130 SO 100 - Continue running csg f/1624' to 3263' - 39 jts (79 total) - PU hanger & landing jt. - Land casing wI FMC fluted hanger wI shoe @ 3302' - FC @ 3214' 1.50 CEMEN CIRC SURFAC Rig down casing equipment - RU cmt head & lines - Circulate & condition for cement job - ICP 300 psi @ 3 B/M - FCR - 270 psi @ 6 B/M - PU 150 SO 125 1.50 CEMEN PUMP SURFAC Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wI nut plug for marker wI rig pumps - Switch to Dowell - Pumped 2 bbls water - Test lines to 2500 psi - Drop bottom plug - Mixed & pumped 50 bbls Mud Push XL @ 10.5 ppg - Mixed & pumped Lead slurry ( AS lite3) @ 10.7 ppg - Observed nut plug marker @ sharkers wI 375 bbls lead pumped - pumped 394 bbls total of lead slurry - Prep to switch to tail slurry 1.00 CEMEN PUMP SURFAC Mixed & pumped Tail slurry (G wI .2% D046, .3% 0065, & 1% S002) @ 15.8 ppg - Dropped top plug wI 20 bbls water fl Dowell - Switch to rig pumps & displace cement wI 228.4 bbls 9.6 ppg mud @ 7 B/M fl 420 to 790 psi - slowed pumps to 3112 B/M for last 18.4 bbls of displacment- Bumped plug w/11 00 psi - CIP @ 0053 hrs. - Full circulation throughout wI 130 bbls. 10.7 ppg cement reutrns to surface Check floats, held. Test casing to 2500 psi for 30 minutes. LD cement head - landing joint, elevators and long bails ND flowline, riser and FMC speed head. Install FMC Unibody Wellhead - test MIM seal to 1000 psi. NU BOPE, flow nipple and flowline. Set test plug and test BOPE 250/5000 psi, Annular preventer 250/3500 psi. AOGCC (John Crisp) waived witnessing tests. Pull test plug and install wear bushing. Install drilling bails and 4" elevators Rigged up and picked up drillpipe from pipeshed and stood back in the derrick. Picked up BHA and tested Geo Span. Installed guide wheels on top drive dolly. Serviced rig. RIH picking up DP to 2470'. RIH -= PU 23 jts. of 4" drill pipe - wash down from 3067' - tagged cement @ 3193' Drill out cement, FC, FS and rathole to 3312' - 504 gpm 12250 psi I 50-80 rpm Drill 20' of new hole to 3332' - ADT =0.15 hrs. CBU - condition mud for FIT RU and perform LOT, established LO @ 16.4 ppg EMW. Drill 8 1/2" hole from 3332' to 4304' MD - 2865' TVD Displaced to 9.6 ppg LSND mud while drilling ahead. WOB 4/20 k RPM 120/150 GPM 650 @ 2450 psi String wt. PU 148 SO 110 Rot. 1120 Torque on/off btm - 10,500 I 8,000 ft. Ibs. ADT = 4.45 hrs ECD 10.6 ppg - 11.1 ppg 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 4304' to 5832' MD - 3637' TVD WOB 10/20 k RPM 150 GPM 650 @ 3150 psi String wt. PU 160 SO 110 Rot. 130 Torque on/off btm - 10,000/8,500 ft. Ibs. 6/7/2004 15:30 - 21 :00 21 :00 - 22:30 22:30 - 00:00 6/8/2004 00:00 - 01 :00 01 :00 - 01 :45 0.75 CASE DEQT SURFAC 01 :45 - 02:45 1.00 CEMEN PULD SURFAC 02:45 - 05:30 2.75 WELCT NUND SURFAC 05:30 - 10:00 4.50 WELCT BOPE SURFAC 10:00 - 10:30 0.50 DRILL RIRD SURFAC 10:30 - 16:15 5.75 DRILL PULD SURFAC 16:15 - 21:00 4.75 DRILL PULD SURFAC 21 :00 - 21 :30 0.50 RIGMNT RGRP SURFAC 21 :30 - 22:00 0.50 RIGMNT RSRV SURFAC 22:00 - 00:00 2.00 DRILL TRIP SURFAC 6/9/2004 00:00 - 01 :30 1.50 DRILL TRIP SURFAC 01 :30 - 02:45 1.25 CEMEN DSHO SURFAC 02:45 - 03:00 0.25 DRILL DRLG SURFAC 03:00 - 03:30 0.50 DRILL CIRC SURFAC 03:30 - 04:00 0.50 DRILL LOT SURFAC 04:00 - 12:00 8.00 DRILL DRLG INTRM1 12:00 - 00:00 Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/9/2004 12:00 - 00:00 12.00 DRILL DRLG INTRM1 ADT = 7.2 hrs ECD 10.6 ppg - 11.6 ppg 6/10/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 5832' to 7331' MD - 4369' TVD WOB 10/30 k RPM 150 GPM 650 @ 2810 psi String wt. PU 200 SO 120 Rot. 145 Torque on/off btm - 13,000/10,500 ft. Ibs. ADT = 7.3 hrs ECD 10.6 ppg - 11.2 ppg 12:00 - 20:00 8.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 7331' to 8500' MD - 4979' TVD WOB 15/30 k RPM 150 GPM 650 @ 3800 psi String wt. PU 210 SO 120 Rot. 150 Torque on/off btm - 14,000/12,500 ft. Ibs. ADT = 5.5 hrs ECD 10.6 ppg - 11.1 ppg 20:00 - 21 :00 1.00 DRILL SURV INTRM1 Had 12 Deg/100' Dog leg (20 Deg over 30') Azm turned from 266 to 277 while building 2 Deg. of angle. Surveyed 30 Ft. stations @ 8409',8442', 8462', and 8473'. 21 :00 - 00:00 3.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 8500' to 8696' MD - 5074' TVD Survey 30' stations. WOB 15/30 k RPM 150 GPM 650 @ 3800 psi String wt. PU 215 SO 120 Rot. 153 Torque on/off btm - 14,000/13,000 ft. Ibs. ADT= 1.5 hrs ECD 10.6 ppg 6/11/2004 00:00 - 14:00 14.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 8696' to 10511' MD - 6005' TVD WOB 15/25 k RPM 150 GPM 630 @ 3600 psi String wt. PU 250 SO 125 Rot. 165 Torque on/off btm - 16,000/14,000 ft. Ibs. ADT = 9.2 hrs ECD 10.7 ppg - 10.9 ppg 14:00 - 14:45 0.75 DRILL SURV INTRM1 8 Deg/100' Right turn. Surveyed @ 10382',10350', and 10319' (Bit depths.). 14:45 - 16:45 2.00 DRILL DRLG INTRM1 Drill 8 1/2" hole from 10511' to 10797' MD - 6160' TVD WOB 15/25 k RPM 150 GPM 630 @ 3620 psi String wt. PU 250 SO 125 Rot. 165 Torque on/off btm - 16,000/14,000 ft. Ibs. ADT= 1.4 hrs ECD 10.7 ppg - 10.9 ppg 16:45 - 17:30 0.75 DRILL SURV INTRM1 11 Deg/100' Left turn. Surveyed @ 10637', 10669', and 10700' (Bit depths.). 17:30 - 00:00 6.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 10797' to 11551' MD - 6547' TVD WOB 20/25 k RPM 150 GPM 630 @ 3650 psi String wt. PU 250 SO 135 Rot. 170 Torque on/off btm - 18,000/16,500 ft. Ibs. ADT = 4 hrs ECD 10.7 ppg -11 ppg 6/12/2004 00:00 - 17:30 17.50 DRILL DRLG INTRM1 Drill 8 1/2" hole from 11551' to 13245' MD - 7428' TVD WOB 20/25 k RPM 150 GPM 600 @ 3980 psi String wt. PU 260 SO 145 Rot. 180 Torque on/off btm - 18,000/15,000 ft. Ibs. ADT = 11.7 hrs ECD 10.8 ppg - 11 ppg 17:30 - 19:45 2.25 DRILL CIRC INTRM1 Pumped pill and circulated hole clean. 19:45 - 21 :00 1.25 DRILL TRIP INTRM1 POOH with pump to 12200'. Pumping 5 BPM. 21 :00 - 23:00 2.00 DRILL TRIP INTRM1 POOH on trip tank to 8500'. 23:00 - 23:30 0.50 DRILL SURV INTRM1 Re surveyed dog leg @ 8504',8473', and 8442'. Max DLS 16.47 Deg/30' . 23:30 - 00:00 0.50 DRILL CIRC INTRM1 Pumped dry job and blew down top drive. 6/13/2004 00:00 - 04:15 4.25 DRILL TRIP INTRM1 POOH from 8510' to 3258', wiped tight spots @ 7444', 6876' and 5202' 25-40 k over. Monitor well @ shoe, static. POOH to 673', lay down ghost reamer and Printed: 7/2912004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: xo, change running tools to 5" and stand back hwdp & jars. UD stab, stand back dc's, remove source and download LWD. Lat down LWD tools, service and lay down Geopilot and bit. Clear tools from floor. RU and pick up 30 joints of 3 1/2" tubing - rig down power tongs - change elevators to 4". RIH with tubing tail below 4" drill pipe, tag bottom @ 13,245'. Space out and RU circulating hose. Stage pumps up to 10 bpm 12250 psi, reciprocate pipe 255K up I 140k dn - circ and condition mud for cementing. PJSM. Flow check well, static. With tubing tail @ 13243', plugged back 81/2" open hole with 40 bbls of class G cement displaced to equalization - ETOC 12745' with 15% excess. POOH 10 stands to 12226'. Rigged up and Circulated 50 Sbls mud. POOH to 8831'. Spotted 38 Sbls Hi vis mud and displaced with 89 Sbls. mud. POOH to 8480'. Circulated and conditioned mud. PJSM. With tubing tail @ 8480', plugged back 81/2" open hole with 46 bbls of class G cement mixed at 17 PPG. displaced to equalization - ETOC 7970' with 15% excess. CIP @ 2337 Hrs. 6/13/04. POOH to 7970'. Circulated hole clean. POOH to 6212'. DP overpulled 50 to 60 K from 6212' to 5409' and had to be pulled through tight spots with pump @ 10 -12 SPM. POOH on trip tank to 940'. Tight spot @ 5055' 25 K. Rigged up and POOH laying down 3.5" tubing tail. Pulled wear bushing and ran test plug. Tested SOPE 250/5000 psi, Annular preventer 250/3500 psi. Tested Closing unit and floor valves 250/5000. AOGCC (John Crisp) waived witnessing tests. Pull test plug and install wear bushing. Made up SHA #3 and RIH to 1800'. Shollow tested MWD. RIH to 3000'. Slipped and cut Drilling line. RIH to 7812' filling pipe every 2000'. Washed and reamed to 8000' took check shots to tie in surveys. Dressed plug to 8020' Drill and side track 8 1/2" hole from 8020' to 8080' MD - 4756' TVD WOS 10/25 k RPM 100 GPM 504 @ 2400 psi String wt. PU 155 SO 120 Rot. 130 Torque on/off btm - 12,000/10,500 ft. Ibs. ADT = .5 hrs ECD 10.4 ppg - 10.6 ppg 12.00 DRILL DRLG INTRM1 Drill and side track 81/2" hole from 8080' to 9488' MD - 5487' TVD WOB 10/25 k RPM 100 GPM 650 @ 3320 psi String wt. PU 230 SO 125 Rot. 163 Torque on/off btm - 15,500/14,500 ft. Ibs. ADT= 7.8 hrs ECD 10.4 ppg - 10.8 ppg 12.00 DRILL DRLG INTRM1 Drill 81/2" hole from 9488' to 11020' MD - 6266' TVD WOB 10/25 k RPM 100 GPM 650 @ 3650 psi 07:45 - 09:10 ASANDN 09:10 - 15:00 ASANDN 15:00 - 15:30 ASANDN 15:30 - 17:30 ASANDN 17:30 - 18:15 0.75 CEMEN PLUG ABANDN 18:15-18:45 0.50 CEMEN TRIP ASANDN 18:45 - 19:15 0.50 CEMEN CIRC ASANDN 19:15 - 21:30 2.25 CEMEN TRIP ASANDN 21 :30 - 21 :45 0.25 CEMEN CIRC ASANDN 21 :45 - 22:00 0.25 CEMEN TRIP ASANDN 22:00 - 23:00 1.00 CEMEN CIRC ASANDN 23:00 - 00:00 1.00 CEMEN PUMP ASANDN 6/14/2004 00:00 - 00:15 0.25 CEMEN TRIP ASANDN 00:15 - 01 :30 1.25 CEMEN CIRC ABANDN 01 :30 - 02:00 0.50 CEMEN TRIP ABANDN 02:00 - 04:30 2.50 CEMEN TRIP ASANDN 04:30 - 07:15 2.75 CEMEN TRIP ASANDN 07:15 - 09:00 1.75 CEMEN PULD ASANDN 09:00 - 09:30 0.50 WELCT BOPE ASANDN 09:30 - 13:30 4.00 WELCT SOPE ASANDN 13:30 - 16:45 3.25 DRILL PULD ASANDN 16:45 - 17:45 1.00 DRILL TRIP ASANDN 17:45 - 18:45 1.00 RIGMNT RSRV ASANDN 18:45 - 21:45 3.00 DRILL TRIP ASANDN 21:45 - 23:15 1.50 DRILL REAM ABANDN 23:15 - 00:00 0.75 DRILL DRLG INTRM1 6/15/2004 00:00 - 12:00 12:00 - 00:00 Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/15/2004 12:00 - 00:00 12.00 DRILL DRLG INTRM1 String wt. PU 265 SO 125 Rot. 168 Torque on/off btm - 16,500/15,000 ft. Ibs. ADT = 7.6 hrs ECD 10.6 ppg - 11 ppg 6/16/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 81/2" hole from 11020' to 12582' MD -7047' TVD WOB 20/25 k RPM 170 GPM 600 @ 3930 psi String wt. PU 245 SO 145 Rot. 185 Torque on/off btm - 17,000/16,000 ft. Ibs. ADT = 7.7 hrs ECD 10.6 ppg - 11 ppg 12:00 - 22:15 10.25 DRILL DRLG INTRM1 Drill 81/2" hole from 12582' to 13608' MD -7342' TVD WOB 20/30 k RPM 170 GPM 600 @ 4050 psi String wt. PU 270 SO 135 Rot. 185 Torque on/off btm - 19,000/18,000 ft. Ibs. ADT = 7.2 hrs ECD 10.6 ppg - 11 ppg 22:15 - 00:00 1.75 DRILL CIRC INTRM1 Pumped sweep and circulated hole clean. 6/17/2004 00:00 - 02:15 2.25 DRILL WIPR INTRM1 POOH with pump @ 4 BPM to 11,965'. Had overpull to 35 K in HRZ with minor packing off. 02:15 - 03:15 1.00 DRILL WIPR INTRM1 RIH and washed down last stand (precaution). 03:15 - 05:30 2.25 DRILL CIRC INTRM1 Pumped sweep and circulated hole clean. 05:30 - 07:30 2.00 DRILL TRIP INTRM1 POOH to 12,158' spotting pill on bottom. 07:30 - 15:45 8.25 DRILL TRIP INTRM1 POOH to 1,146' max overpull 60 K @ 11890'. 15:45 - 19:30 3.75 DRILL PULD INTRM1 POOH and laid down BHA. 19:30 - 21 :00 1.50 DRILL OTHR INTRM1 Pulled wear bushing and flushed stack. Ran Thin ring and test plug. 21 :00 - 22:00 1.00 WELCT BOPE INTRM1 Changed rams to 7" and tested rams. 22:00 - 23:00 1.00 CASE RURD INTRM1 Rigged up to run casing. 23:00 - 00:00 1.00 CASE RUNC INTRM1 PJSM and ran 6 Jts. of 7" 26# L-80 BTCM casing. 6/18/2004 00:00 - 02:15 2.25 CASE RUNC INTRM1 Rih wI 7" csg from 250' to 3261'. 02:15 - 02:45 0.50 CASE CIRC INTRM1 Circ 1 csg volume at 5 bpm at 310 psi. 02:45 - 03:30 0.75 CASE OTHR INTRM1 Change out Franks fill up tool. Cup was leaking. 03:30 - 07:45 4.25 CASE RUNC INTRM1 RIH wI 7" csg from 3261' to 7590'. 07:45 - 08:45 1.00 CASE CIRC INTRM1 Circ and condition mud at 4 bpm at 430 psi. Upwt - 220 k. Dn wt - 120k. 08:45 - 13:00 4.25 CASE RUNC INTRM1 RI H wI 7" csg from 7590' to 11 ,816'. 13:00 - 15:00 2.00 CASE CIRC INTRM1 Circ and condition mud at 4 bpm at 580 psi. Upwt - 325 k. On wt - 145 k. 15:00 - 00:00 9.00 CASE RUNC INTRM1 RIH w/7" csg from 11816' to 12,750'. From 12750' to 13515' casing was tight 460 K up and All of weight down to make a few feet at a time. Attempts to circulate tried to pack off. 6/19/2004 00:00 - 00:30 0.50 CASE RUNC INTRM1 Ran 7" 26# L-80 BTCM casing from 13515' to 13561'. Made up hanger and landed casing @ 13598'. 00:30 - 01 :00 0.50 CASE RURD INTRM1 Rigged down fill up tool and made up cement head and lines. 01:00-03:15 2.25 CEMEN CIRC INTRM1 Broke circulation with 1 BPM and worked up in stages to 7 BPM as pressure and flow stabilized. Final circulating pressure 1000 PSI @ 7 BPM with full returns. Attempted to work pipe pulled up to 475 K. Pipe stuck. Seweight back on hanger. PJSM for cement job. 03:15 - 05:15 2.00 CEMEN PUMP INTRM1 Pump 5 bbls CW100. Test lines to 3500 psi. Pump 15 bbls CW100, 50 bbls 12.5 mud push. Drop bottom plug and 47 bbls 15.8 cement. Drop top plug. Dowell pumped 20 bbls H20. Rig displaced with 497 bbls 9.8 mud. Bumped plug with 1400 PSI. Check floats OK. CIP @ 0505Hrs. 6/19/04. 05:15 - 06:00 0.75 CASE MIT INTRM1 Rigged up and tested casing 3500 PSI for 30 miniutes. 06:00 - 06:45 0.75 CASE RURD INTRM1 Rigged down cement and casing tools. 06:45 - 07:45 1.00 CASE DEQT INTRM1 Laid down landing joint. Installed and tested packoff. 07:45 - 08:45 1.00 WELCT EQRP INTRM1 Changed out rams from 7" to VBR. 08:45 - 13:00 4.25 WELCT BOPE INTRM1 Set test plug and Tested Annular to 250/3500 PSI. Tested rams,choke Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: lines, kill lines, choke and kill valves and floor valves to 250/5000 PSI. Tested IBOP to 250/5000 PSI. State inspecter. AOGCC (Chuck Scheve) waived witnessing tests. Pull test plug and install wear bushing. 13:00 - 13:30 0.50 DRILL RIRD INTRM1 Picked up bales and elevators. 13:30 - 17:30 4.00 DRILL PULD INTRM1 Made up BHA and RIH. Shallow tested MWD. 17:30 - 20:30 3.00 DRILL PULD INTRM1 Picked up and RIH 150 Jts. 4" DP from pipe shed. Broke circulation at 4000'. 20:30 - 00:00 3.50 DRILL TRIP INTRM1 RIH to 12500'. Broke circulation @ 9000'. 6/20/2004 00:00 - 00:30 0.50 DRILL TRIP INTRM1 RIH to 13,358'. 00:30 - 01 :30 1.00 RIGMNT RSRV INTRM1 Slipped and cut drilling line. 01 :30 - 04:30 3.00 CEMEN DSHO INTRM1 Drilled out shoe track and cleaned out rat hole to 13,608'. 04:30 - 05:00 0.50 DRILL DRLG INTRM1 Drill 61/8" hole from 13608' to 13628' MD - 7342' TVD WOB 6/10 k TO RPM 50 GPM 200 @ 1530 psi String wt. PU 240 SO 130 Rot. 175 Torque on/off btm - 19,000/18,000 ft. Ibs. ADT = .3 hrs ECD 10. ppg - 11 ppg 05:00 - 06:15 1.25 CEMEN CIRC INTRM1 Circulated and conditioned mud for FIT. 06:15 - 07:00 0.75 CEMEN FIT INTRM1 FITto 12.5 PPG EMW. 07:00 - 07:15 0.25 DRILL SFTY PROD PJSM for mud change out. 07:15 - 09:15 2.00 DRILL CIRC PROD Changed out mud system displaced 9.8 PPG LSND with 8.5 PPG MOBM. 09:15 - 12:00 2.75 DRILL DRLH PROD Drill 61/8" hole from 13628' to 13700' MD -7348' TVD WOB 6/10 k TO RPM 50 GPM 200 @ 1530 psi String wt. PU 240 SO 130 Rot. 175 Torque on/off btm - 19,000/18,000 ft. Ibs. ADT = 1.4 hrs AST 1.2 ART .2 ECD 10. ppg - 11 ppg 12:00 - 00:00 12.00 DRILL DRLH PROD Drill 61/8" hole from 13700' to 14312' MD - 7334' TVD WOB 6/10 k TO RPM 50 GPM 220 @ 2750 psi String wt. PU 265 SO 120 Rot. 175 Torque on/off btm - 17,000/17,000 ft. Ibs. ADT = 8.8 hrs AST 4.5 ART 4.3 ECD 9.6. ppg - 10.2 ppg 6/21/2004 00:00 - 04:30 4.50 DRILL DRLH PROD Drill 61/8" hole from 14312' to 14598' MD -7330' TVD WOB 6/10 k TO RPM 90 GPM 220 @ 2800 psi String wt. PU 265 SO 120 Rot. 175 Torque on/off btm - 17,000/17,000 ft. Ibs. ADT = 4.0 hrs AST .5 ART 3.5 ECD 9.6. ppg - 10.2 ppg / 04:30 - 05:15 0.75 DRILL CIRC PROD Circulate while raising MW to 8.7 PPG to counter Connection gas. 05:15 - 05:45 0.50 DRILL DRLH PROD Drill 61/8" hole from 14598' to 14618' MD - 7330' TVD WOB 6/10 k TO RPM 90 GPM 220 @ 2750 psi String wt. PU 265 SO 120 Rot. 175 Torque on/off btm - 16,000/16,000 ft. Ibs. ADT = .5 hrs AST 0 ART .5 ECD 9.6. ppg - 10.2 ppg 05:45 - 06:15 0.50 DRILL CIRC PROD Attempted to slide. Circulate and spotted nut plug pill. 06:15 - 07:30 1.25 DRILL DRLH PROD Drill 6 1/8" hole from 14618' to 14694' MD - 7332' TVD WOB 6/10 k TD RPM 90 GPM 220 @ 2750 psi String wt. PU 265 SO 120 Rot. 175 Torque on/off btm - 17,000/17,000 ft. Ibs. ADT = .75 hrs AST 0 ART .75 ECD 9.6. ppg - 10.2 ppg 07:30 - 08:45 1.25 DRILL CIRC PROD Checked well slight flow. Circulated and raised MW to 8.8 PPG. j 08:45 - 12:00 3.25 DRILL DRLH PROD Drill 61/8" hole from 14694' to 14885' MD - 7337' TVD WOB 6/10 k TO RPM 90 GPM 220 @ 2950 psi String wt. PU 270 SO 125 Rot. 177 Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/21/2004 08:45 - 12:00 3.25 DRILL DRLH PROD 12:00 - 00:00 12.00 DRILL DRLH PROD 6/22/2004 00:00 - 12:00 12.00 DRILL DRLG PROD 12:00 - 19:30 7.50 DRILL DRLH PROD 19:30 - 20:30 1.00 DRILL OTHR PROD 20:30 - 22:30 2.00 DRILL CIRC PROD 22:30 - 00:00 1.50 DRILL DRLH PROD 6/23/2004 00:00 - 12:00 12.00 DRILL DRLG PROD 12:00 - 00:00 12.00 DRILL DRLH PROD 6/24/2004 00:00 - 08:30 8.50 DRILL DRLG PROD 08:30 - 11 :00 11 :00 - 18:30 2.50 DRILL CIRC PROD 7.50 DRILL WIPR PROD Torque on/off btm - 16,000/16,000 ft. Ibs. ADT = 1.45 hrs AST .15 ART 1.3 ECD 9.6. ppg - 10.2 ppg Drill 61/8" hole from 14885' to 15480' MD -7317' TVD WOB 6/10 k TO RPM 90 GPM 220 @ 3160 psi String wt. PU 265 SO 120 Rot. 175 Torque on/off btm - 16,500/16,000 ft. Ibs. ADT = 8.3 hrs AST 2.06 ART 6.24 ECD 9.6. ppg - 10.2 ppg Drill 6 1/8" horizontal section f/ 15,480' to 16,126' MD 7311' TVD WOB 5/12 k RPM 100 GPM 220 @ 3100 psi String wt. PU 265 SO 120 Rot 174 Torque on/off btm - 17,500/17,000 ftllbs Total ADT 8.50 hrs = ART - 7.03 hrs AST - 1.47 hrs Drill 6 1/8" horizontal section f/16, 126' to 16,508' MD 7306' TVD WOB 9/11 k RPM 90 GPM 220 @ 3200 psi Stringwt. PU210 SO 115 Rot 174 Torque on/off btm - 17000/17000 ft,/Ibs ADT - 5.27 hrs. = ART - 4.14 hrs. AST - 1.13 hrs. . Note - MWD failed @ kelly down Trouble shoot MWD - Pumped 5 bbls minerial oil sweep - Unable to get MWD to respond Circulate & weight up to 9.0 ppg for trip out - MWD tool began working again - Make connection & check out tool - tool responding Drill 6 1/8" hole f/16,508' to 16,554' MD 7307' TVD WOB 7/9 k RPM 90 GPM 220 @ 3100 psi String wt. pu 270 SO 115 Rot 174 Torque on/off btm. - 17,000/17,000 ftllbs. ADT -.63 hrs. = ART - .25 hrs. AST - .38 hrs. Bringing mud wt. back to 8.9 ppg Drill 6 1/8" horizontal section f/16,554' to 17,093' MD 7309' TVD WOB 7/11 k RPM 100 GPM 220 @ 3260 psi String wt. PU 275 SO 115 Rot 170 Torque on/off btm - 17,500/17,500 ftllbs Total ADT 8.20 hrs = ART - 6.69 hrs AST - 1.51 hrs Drill 6 1/8" horizontal section f/17,093' to 17,665' MD 7311' TVD WOB 7/10 k RPM 100 GPM 220 @ 3260 psi String wt. PU 275 SO 110 Rot 170 Torque on/off btm - 17,000/17,000 ftllbs. Total ADT -8.32 hrs. = ART - 7.2 hrs AST - 1.12 hrs. Average ECD past 24 hrs. - 10.8 to 11.3 Drill 6 118" horizontal section f/17,665' to 18,131' MD 7311' TVD WOB 7/10 k RPM 100 GPM 220 @ 3440 psi String wt. PU 275 SO 105 Rot 170 Torque on/off btm - 18,000/18,000 ftllbs Total ADT- 6.98 hrs = ART - 6.24 hrs AST - .74 hrs ECD at TO - 11.5 - 11.6 Circ and condition mud. Increase mud wt to 9.0 ppg for trip margin. Monitor well. (Static) POH wI pump from 18,131' to 13,544' 207 gpm Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/24/2004 11 :00 - 18:30 7.50 DRILL WIPR PROD with 90 rpms. 18:30 - 19:00 0.50 DRILL OBSV PROD Monitor well -(static) - Clean up rig floor of OBM for TIH 19:00 - 21 :30 2.50 DRILL TRIP PROD RIH f/13,544' to 18,035' 21 :30 - 00:00 2.50 DRILL CIRC PROD Wash & ream f/18,035' to 18,131' - Circulate hole clean for trip out 207 gpm @ 2800 psi 90 rpm 6/25/2004 00:00 - 00:30 0.50 DRILL CIRC PROD Finish circ 2X bottoms up to clean hole. 207 gpm - 2790 psi - 90 rpm's 00:30 - 08:30 8.00 DRILL TRIP PROD Check flow. Static. POH wI pump and rotary from 18,131' to 13,548'. 207 gpm - 2720 psi - 90 rpm's. 08:30 - 10:00 1.50 DRILL CIRC PROD Check flow. Static. CBU. 210 gpm - 2580 psi -70 rpm's. Check flow. Static. Drop 2.25" rabbit w/11 0' tail. 10:00 - 14:30 4.50 DRILL TRIP PROD POH wI pump from 13,548' to 10,206. Hole taking proper fill. 14:30 - 15:30 1.00 DRILL OBSV PROD Attempt to POH without pump. Well is static with no pipe movement. Moving pipe up or down or pipe rotation will cause well to flow. 15:30 - 17:00 1.50 DRILL TRIP PROD RIH f/10,206' to 13,550' 17:00 - 19:00 2.00 DRILL CIRC PROD Circulate bottoms - 5 BPM wI 20 RPM - ICP 2560 FCP 2450 - monitor well - still slight flow - Continue to circulate for surface to surface .; strokes - monitor well - still slight flow 19:00 - 20:00 1.00 WELCT OBSV PROD Shut in well & monitor pressures for 20 mins. ISIDDP 10 psi ISICPO FSIDDP - 10 psi FSICP - 0 Open well obsevered slight flow Notified Weekend duty Supervisor - discussed options 20:00 - 21 :30 1.50 RIGMNT RSRV PROD Change out saver sub in top drive - monitored well on trip tank - no gain - pulled slips & observed slight flow 21 :30 - 00:00 2.50 DRILL TRIP PROD RIH f/13,550' to 17,750' 6/26/2004 00:00 - 00:30 0.50 DRILL TRIP PROD Finish RIH from 17,750' to 18,131'. No hole problems. 00:30 - 02:30 2.00 DRILL CIRC PROD Circ 2X bottoms up at 200 gpm - 2600 psi - 90 rpms. No gas, crude or gas cut mud in returns. 02:30 - 10:30 8.00 DRILL TRIP PROD Monitor well. (static). POH wI pump and rotary from 18,131' to 13,596'. 200 gpm - 2300 psi - 90 rpms. 10:30 - 11 :00 0.50 DRILL OBSV PROD Monitor well at shoe. (static). Rotate pipe at 20 rpms. Well is staic. 11 :00 - 15:45 4.75 DRILL TRIP PROD POH wI pump and rotary from 13,596' to 10,206'. 200 gpm - 2000 psi - 30 rpms 15:45 - 21 :00 5.25 DRILL TRIP PROD Continue to POH wI pump f/1 0,206' to 6575' - 202 gpm @ 1600 psi wI 30 rpm Hole taking proper fill v' 21 :00 - 21 :30 0.50 DRILL OBSV PROD Monitor well - observed slight flow ( same as before) 21 :30 - 22:00 0.50 DRILL TRIP PROD Continue POH wI pump f/6575' to 6100' - as parameters as before 22:00 - 23:30 1.50 DRILL CIRC PROD Monitor well - observed slight flow - circulate 2 x btms up - Go gas - mud wt. 9.1 ppg Notified weekend supervisor & discussed options 23:30 - 00:00 0.50 DRILL OBSV PROD Monitor well for flow - slight flow 6/27/2004 00:00 - 01 :30 1.50 DRILL OBSV PROD Cont' to observe well. Small flow. < 2 bbls in two hours into trip tank 01 :30 - 07:00 5.50 DRILL TRIP PROD POH wI pump f/6035' to 3044' - 202 gpm @ 1400 psi wI 30 rpm. Last 5 stds had 0 hole fill. 07:00 - 08:30 1.50 DRILL OBSV PROD Observe well. Had small flow. Close annular. Circ well to fill choke lines and gas buster. Shut well in. Monitor pressures. Initial - DP - 20 psi Annulus - 0 psi. I hr SIP - DP - 20 psi Annulus - 15 psi. 08:30 - 10:00 1.50 DRILL CIRC PROD Circ and increase mud wt to 10.0 ppg. 10:00 - 10:30 0.50 DRILL OBSV PROD Observe well (static). POH w/1 std DP. Fluid level dropped in bell nipple. 10:30 - 17:30 7.00 DRILL TRIP PROD RIH wI 4" DP from 3044' to 13,550'. Fill pipe every 20 stds wI 9.5 ppg mud. Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 6/27/2004 17:30 - 19:00 1.50 DRILL CIRC PROD Circulate to 9.4+ ppg - 4 BPM @ 1820 pis wI 30 rpm - flow check - well static 19:00 - 20:30 1.50 RIGMNT RSRV PROD Cut & slip 60' drilling line - (monitor well - fluid level 6" below flow line after 1.5 hrs.) 20:30 - 21 :00 0.50 DRILL CIRC PROD Began to circulate to POOH - Observed gas breaking out of mud @ possium belly - mud wt. 9.4+ ppg - checked mud wI hand held gas monitor - showed 24 ppm C02- Circulate out - flow check (static) 21 :00 - 00:00 3.00 DRILL TRIP PROD POOH wI pump f/13,550' to 12,115' - 4 BPM @ 1600 pis psi wI 30 rpm - hole taking proper fill 6/28/2004 00:00 - 03:30 3.50 DRILL TRIP PROD POOH wI pump f/12, 115' to 9733' - 4 BPM @ 1300 psi wI 30 rpm - hole taking proper fill 03:30 - 04:00 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking fluid. 04:00 - 05:30 1.50 DRILL TRIP PROD POOH wI pump f/9733' to 8788' - 4 BPM @ 1200 psi wI 30 rpm - hole taking proper fill 05:30 - 06:00 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking proper fill. 06:00 - 08:00 2.00 DRILL TRIP PROD POOH wI pump f/8788' to 6700' - 4 BPM @ 1100 psi wI 30 rpm - hole taking proper fill 08:00 - 08:30 0.50 DRILL OBSV PROD Observe well. (static). Attempt to POH without pump. Hole not taking proper fill. 08:30 - 12:00 3.50 DRILL TRIP PROD POOH wI pump fl 6700' to 4950' - 4 BPM @ 1000 psi wI 30 rpm - hole taking proper fill 12:00 - 13:30 1.50 DRILL TRIP PROD Observe well. (static). POH on trip tank from 4950' to 3044'. 13:30 - 15:30 2.00 DRILL TRIP PROD POH on TT fl 3044' to 376' - hole took proper fill 15:30 - 17:00 1.50 DRILL TRIP PROD Handle BHA - stand back HWDP & jars, NM flex DC's, MWD & motor - break off bit 17:00 - 17:30 0.50 CMPL TN OTHR CMPL TN Clean up rig floor fl OBM for liner run 17:30 - 18:00 0.50 CMPL TN RURD CMPL TN RU to run 4 1/2" liner 18:00 - 00:00 6.00 CMPL T RUNT CMPL TN PJSM - Run 41/2" 12.6# L-80 IBTM liner w/4 1/2" tbg pup jts wI (8) 1/2" holes as follows: Baker Float shoe - 1 jt tbg - pup - 4 jts tbg - pup - 4 jts tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 3 jts. tbg - pup - 9 jts tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 4 jts. tbg - pup - 3 jts. tbg - pup - 26 jts tbg. Ran 122 jts. total wI 24 total pup jts. w/8 - 1/2" holes 6/29/2004 00:00 - 02:00 2.00 CMPL TN RUNT CMPL TN PU & MU Baker Seal bore extension, Baker Flex Loc liner hanger, Baker ZXP liner top packer 02:00 - 13:30 11.50 CMPL TN RUNT CMPL TN RIH w/41/2" liner assembly on 4" DP f/5430' to 13511'. 13:30 - 13:45 0.25 CMPL TN CIRC CMPL TN Establish circulating rates I pressures - 2 bpm @ 800 psi, 3 bpm @ 1000 psi and 4 bpm @ 1250 psi. 13:45 - 20:00 6.25 CMPL TN RUNT CMPL TN Continue running 4 1/2" liner assembly 0 4" DP from 13511' to 18,121' 20:00 - 21 :30 1.50 CMPL TN PCKR CMPL TN PJSM - Drop hanger setting ball & pump down @ 3 BPM @ 1300 psi - Pressure up to 2700 psi to set liner hanger - slacked off wI 50 k to verify hanger set - Pressure up to 4000 psi to relaese running tools - rotate & set down to set ZXP liner top packer - Test annulus to 1000 psi Top of liner - 12,628' Tail @ 18,119' 21 :30 - 22:00 0.50 CMPL TN PCKR CMPL TN Attempt to shear ball seat - pressure up DP to 5000 psi wI Dowell ( ball shear pinned for 4800 psi) made 5 attempts to shear out - unsuccessful Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: Pull up to clear running tools f/liner top - LD top single - Monitor well (static) - Blow down Dowell lines & kill line - Circulate bottoms up @ 4 BPM ICP 1500 - FCP 1250 psi Monitor well, static. Pump out of hole from 12603' to 5347' @ 4 bpm I 1150 - 460 psi. Attempted to pull with out pumps @ 9643',7300',5347', swabbing hole. Pump out from 5347' to 3436' @ 4 bpm 1460 psi. Monitor well, static. POOH on trip tank from 3436' to 1520' - Flow check -static - POOH on TT f/ 1520' to 40' Change out elevatores & LD Baker liner running tool - Flow check - static Pull wear bushing - clean up rig floor - Blow down TO RU to run 3 1/2" tbg - PJSM Run 3 1/2" 9.3# L-80 EUE Mod tbg as follows: Baker 80/40 Seal Assembly -locator sub w/3 1/2" pup jt. - 1 jt. tbg - XN nipple wI RHC plug installed - 2 jts. tbg - Baker CMPA sliding sleeve - 2 jts tbg - Cameo KBUG GLM wI dummy - 68 jts tbg to 2350' Run 3 1/2" 9.3# L-80 EUE Mod tbg from 2350' to 10324' (total of 331 jts). MU TRM4E SSSV - RU control line spooler - attach and test single control line to 5000 psi 110 min. Continue to run tubing - installing one band per joint - RU pump down hose on jnt. # 406 - establish circ with 1.5 bpm 1740 psi - located top of PBR, shut down and bleed off pump. Slack off and tag down with locator sub. 2.00 CMPL TN OTHR CMPL TN lay down 3 joints of 31/2" tubing - change running tools to 4 1/2" - MU XO sub - (1) 41/2" pup joint - 1 joint of 4 1/2", 12.6#, L-80, IBTM tbg and FMC tubing hanger. Attach Control line to hanger and test connection to 5000 psi. MU landing joint A and land hanger in wellhead with tail @ 12678' (locator sub 4' above no go). RILDS - LD LJa - install TWC - MU LJb and test hanger seals to 5000 psi. LD LJb. RU & flush BOP stack - kill & choke lines - gas buster - blow down TO ND flow line - bell nipple - turn buckles - ND & set back BOP stack - Change saver sub in TD NU tree - test seals to 5000 psi - RU FMC lubicator - Test tree & lubicator to 5000 psi -Pull TWC - RU Doyon lubicator & drop rod & ball - 6/29/2004 22:00 - 00:00 2.00 CMPL TN CIRC CMPL TN 6/30/2004 00:00 - 11 :30 11.50 CMPL TN TRI P CMPL TN 11 :30 - 14:00 2.50 CMPL TN TRI P CMPL TN 14:00 - 18:30 4.50 CMPL TN TRI P CMPL TN 18:30 - 19:00 0.50 CMPL TN PULD CMPL TN 19:00 - 20:00 1.00 CMPL TN OTHR CMPL TN 20:00 - 20:30 0.50 CMPL TN RURD CMPL TN 20:30 - 00:00 3.50 CMPL TN RUNT CMPL TN 7/1/2004 00:00 - 07:30 7.50 CMPL TN RUNT CMPL TN 07:30 - 08:30 1.00 CMPL TN RUNT CMPL TN 08:30 - 13:30 5.00 CMPL TN RUNT CMPL TN 13:30 - 15:30 15:30 - 16:30 1.00 CMPL TN SEaT CMPL TN 16:30 - 18:00 1.50 CMPL TN OTHR CMPL TN 18:00 - 19:30 1.50 CMPL TN NUND CMPL TN 19:30 - 22:00 2.50 CMPL TN SEaT CMPL TN 22:00 - 00:00 2.00 CMPL TN OTHR CMPL TN 7/2/2004 00:00 - 01 :00 1.00 CMPL TN DEaT CMPL TN 01 :00 - 02:00 1.00 CMPL TN RURD CMPL TN 02:00 - 03:00 1.00 CMPL TN OTHR CMPL TN 03:00 - 04:00 1.00 CMPL TN OTHR CMPL TN 04:00 - 05:30 1.50 CMPL TN OTHR CMPL TN 05:30 - 06:30 1.00 RIGMNT RGRP CMPL TN 06:30 - 15:30 9.00 CMPL TN OTHR CMPL TN 15:30 - 17:30 2.00 CMPL TN OTHR CMPL TN RU hard line to tree - PJSM - Test lines to 4000 psi - Test tbg to 3500 psi for 30 mins.- Bleed tbg to 2500 psi & pressure up on to annulus to 3500 psi Pressure test Annulus to 3500 psi for 30 min - bled off annulus and tubing. Made four attempts with 3500 psi on annulus to shift sliding open, unable (S/S pinned for 2800 psi). Flush and vac out circ lines and manifold, RD same. RU and test FMC lubricator - install BPV - RD lubricator and secure wellhead. Lay down BHA #4 from derrick. Lay down excess 4" drill pipe from Derrick for rig move. Drawworks electric brake tripped off - Troubleshoot Baylor Brake. Continue to lay down 4" drill pipe from derrick - Total of 354 joints. Remove excess equipment from rig floor - clean drill pipe and rig floor Printed: 7/29/2004 11 :08:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: CD2-31 CD2-31 ROT - DRILLING doyon1 @ppco.com Doyon 19 Start: 6/5/2004 Rig Release: 7/2/2004 Rig Number: Spud Date: 6/5/2004 End: 7/2/2004 Group: 71212004 15:30 - 17:30 2.00 CMPL TN OTHR CMPL TN drip pans of MOBM residue Released Rig @ 1800 hrs. - Move to C02-53 Printed: 7/29/2004 11 :08:38 AM . . 16-Jul-04 AOGCC Robin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-31 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 7,956.83' MD 8,021.41' MD 18,131.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 'U oJiJ I DateJ ~ j JÎ~ v1- Signed Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) EÀ()'\J~'~-~"~'~ . Halliburton Sperry-Sun Alaska North Slope North Slope, Alaska Alpine CD-2 CD2-31 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 Survey Report 14 July, 2004 . Your Ref: API 501032049300 Surface Coordinates: 5974482.74 N, 371713.04 E (70020'18.6650" N, 151002'27.5128" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Survey Ref: svy406 Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid) Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True) Kelly Bushing Elevation: 52.84ft above Mean Sea Level Kelly Bushing Elevation: 52.84ft above Project V Reference Kelly Bushing Elevation: 52. 84ft above Structure sper"r"y-suil! DFU........ING seRVices A Halliburton Company Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31 Your Ref: API 501032049300 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7956.83 57.230 261.820 4636.72 4689.56 134.88 S 5911.10 W 5974449.01 N 365800.49 E 5509.61 Tie On Point 8021.41 56.780 262.640 4671 .89 4724.73 142.21 S 5964.77 W 5974442.60 N 365746.71 E 1.273 5557.55 Window Point 8069.56 56.200 264.800 4698.47 4751.31 146.60 S 6004.67 W 5974438.89 N 365706.74 E 3.929 5593.55 8118.37 55.970 265.570 4725.71 4778.55 150.00 S 6045.03 W 5974436.18 N 365666.32 E 1.391 5630.33 8213.55 55.730 265.230 4779.14 4831.98 156.32 S 6123.55 W 5974431.21 N 365587.71 E 0.389 5701.96 . 8309.15 56.260 267.590 4832.61 4885.45 161.27 S 6202.64 W 5974427.61 N 365508.55 E 2.120 5774.60 8404.48 57.380 270.200 4884.78 4937.62 162.80 S 6282.40 W 5974427.45 N 365428.78 E 2.575 5849.04 8499.78 58.690 269.770 4935.24 4988.08 162.82 S 6363.24 W 5974428.81 N 365347.94 E 1 .427 5925.02 8595.16 61.170 269.620 4983.02 5035.86 163.26 S 6445.78 W 5974429.78 N 365265.41 E 2.604 6002.44 8690.48 61.860 268.410 5028.48 5081.32 164.71 S 6529.54 W 5974429.77 N 365181.63 E 1.330 6080.68 8786.82 60.890 266.940 5074.64 5127.48 168.13 S 6614.04 W 5974427.79 N 365097.10 E 1.676 6158.92 8881.55 59.110 266.240 5122.00 5174.84 173.01 S 6695.92 W 5974424.32 N 365015.14 E 1.985 6234.22 8977.23 58.900 265.100 5171.28 5224.12 179.20 S 6777.71 W 5974419.52 N 364933.26 E 1.045 6308.97 9072.58 59.050 264.760 5220.42 5273.26 186.42 S 6859.10 W 5974413.70 N 364851.76 E 0.344 6383.00 9167.88 58.660 265.650 5269.71 5322.55 193.24 S 6940.37 W 5974408.27 N 364770.38 E 0.898 6457.06 9263.39 58.810 266.640 5319.28 5372.12 198.73 S 7021.83 W 5974404.18 N 364688.84 E 0.900 6531.74 9358.66 59.260 267.420 5368.30 5421.14 202.96 S 7103.41 W 5974401.34 N 364607.20 E 0.846 6606.97 9454.30 59.750 268.320 5416.83 5469.67 206.02 S 7185.76 W 5974399.69 N 364524.81 E 0.959 6683.33 9550.41 60.240 268.190 5464.90 5517.74 208.55 S 7268.95 W 5974398.58 N 364441.59 E 0.523 6760.65 9645.56 60.170 267.990 5512.18 5565.02 211.31 S 7351.48 W 5974397.24 N 364359.02 E 0.197 6837.28 9741.12 59.990 266.860 5559.84 5612.68 215.03 S 7434.21 W 5974394.93 N 364276.23 E 1.042 6913.77 9836.10 59.530 266.650 5607.68 5660.52 219.67 S 7516.14 W 5974391.69 N 364194.24 E 0.521 6989.18 . 9932.11 58.670 266.400 5656.98 5709.82 224.66 S 7598.37 W 5974388.11 N 364111.94 E 0.923 7064.76 10027.76 58.270 265.180 5707.00 5759.84 230.65 S 7679.68 W 5974383.51 N 364030.54 E 1.165 7139.14 10123.37 58.260 265.690 5757.29 5810.13 237.12 S 7760.73 W 5974378.43 N 363949.39 E 0.454 7213.11 10218.84 58.020 266.390 5807.69 5860.53 242.72 S 7841.62 W 5974374.21 N 363868.41 E 0.672 7287.22 10314.51 58.090 266.580 5858.31 5911.15 247.70 S 7922.65 W 5974370.62 N 363787.31 E 0.184 7361.68 10410.35 58.330 265.920 5908.80 5961.64 253.03 S 8003.94 W 5974366.69 N 363705.94 E 0.637 7436.26 10506.24 59.330 266.540 5958.43 6011.27 258.42 S 8085.81 W 5974362.70 N 363623.99 E 1.181 7511.36 10601.97 60.100 268.450 6006.71 6059.55 262.02 S 8168.39 W 5974360.50 N 363541.36 E 1.901 7587.75 10696.52 60.540 269.110 6053.52 6106.36 263.77 S 8250.51 W 5974360.16 N 363459.22 E 0.764 7664.34 10792.48 60.690 268.330 6100.61 6153.45 265.64 S 8334.11 W 5974359.72 N 363375.61 E 0.725 7742.27 10887.42 60.330 268.050 6147.34 6200.18 268.25 S 8416.70 W 5974358.53 N 363292.98 E 0.458 7819.01 10983.24 60.530 267.940 6194.63 6247.47 271.17 S 8499.99 W 5974357.04 N 363209.65 E 0.231 7896.29 11078.47 60.390 268.070 6241.58 6294.42 274.05 S 8582.79 W 5974355.57 N 363126.81 E 0.189 7973.13 14 July, 2004 - 8:16 Page 2 of 6 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31 Your Ref: API 501032049300 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) CO 11 OOft) 11173.82 60.030 268.350 6288.95 6341.79 276.64 S 8665.50 W 5974354.40 N 363044.07 E 0.456 8049.98 11269.44 59.870 269.320 6336.84 6389.68 278.32 S 8748.25 W 5974354.13 N 362961.31 E 0.894 8127.18 11364.77 59.750 269.170 6384.78 6437.62 279.40 S 8830.64 W 5974354.46 N 362878.91 E 0.185 8204.25 11459.97 60.110 267.880 6432.48 6485.32 281.53 S 8913.00 W 5974353.74 N 362796.53 E 1.232 8280.93 11555.73 60.400 265.550 6479.99 6532.83 286.29 S 8996.00 W 5974350.40 N 362713.46 E 2.134 8357.31 . 11651.20 59.340 264.280 6527.92 6580.76 293.61 S 9078.24 W 5974344.49 N 362631 .10 E 1.599 8432.11 11746.75 59.100 264.650 6576.81 6629.65 301.53 S 9159.95 W 5974337.97 N 362549.27 E 0.417 8506.20 11842.31 58.680 264.620 6626.19 6679.03 309.17 S 9241.41 W 5974331.72 N 362467.70 E 0.440 8580.14 11938.12 58.770 264.840 6675.93 6728.77 316.70 S 9322.95 W 5974325.59 N 362386.04 E 0.218 8654.21 12032.57 58.180 265.570 6725.31 6778.15 323.43 S 9403.18 W 5974320.23 N 362305.71 E 0.908 8727.32 12128.18 58.040 266.770 6775.82 6828.66 328.85 S 9484.17 W 5974316.20 N 362224.63 E 1.076 8801.59 12223.23 58.180 271.220 6826.06 6878.90 330.26 S 9564.83 W 5974316.17 N 362143.96 E 3.978 8876.92 12319.40 60.170 275.980 6875.35 6928.19 325.04 S 9647.21 W 5974322.79 N 362061.68 E 4.727 8956.13 12414.94 62.000 286.290 6921.64 6974.48 308.86 S 9729.09 W 5974340.37 N 361980.09 E 9.635 9038.61 12510.64 62.710 291.050 6966.07 7018.91 281.72 S 9809.36 W 5974368.88 N 361900.29 E 4.468 9123.33 12606.23 63.940 293.410 7008.98 7061.82 249.40 S 9888.42 W 5974402.55 N 361821.80 E 2.554 9208.66 12701.58 66.260 295.970 7049.13 7101.97 213.27 S 9966.98 W 5974440.02 N 361743.87 E 3.442 9294.84 12797.36 69.400 297.030 7085.27 7138.11 173.69 S 10046.34 W 5974480.96 N 361665.20 E 3.435 9382.95 12892.02 72.970 299.510 7115.80 7168.64 131.24S 10125.22 W 5974524.74 N 361587.05 E 4.513 9471.59 12987.76 73.860 304.040 7143.14 7195.98 82.93 S 10203.20 W 5974574.38 N 361509.91 E 4.629 9561.37 13081.54 73.610 306.050 7169.41 7222.25 31 .24 S 10276.90 W 5974627.33 N 361437.11 E 2.075 9648.30 13179.13 73.930 304.840 7196.68 7249.52 23.10 N 10353.24 W 5974682.96 N 361361.71 E 1.235 9738.60 . 13274.43 75.400 308.380 7221.89 7274.73 77.90 N 10426.99 W 5974739.02 N 361288.91 E 3.900 9826.64 13366.95 76.930 311.670 7244.02 7296.86 135.67 N 10495.76 W 5974797.96 N 361221.13 E 3.828 9911.01 13462.63 78.690 316.330 7264.24 7317.08 200.63 N 10563.01 W 5974864.05 N 361155.01 E 5.103 9996.39 13533.65 80.320 318.950 7277.17 7330.01 252.22 N 10610.05 W 5974916.45 N 361108.86 E 4.292 10058.23 13598.62 82.780 320.870 7286.72 7339.56 301.38 N 10651.43 W 5974966.31 N 361068.33 E 4.783 10113.91 13694.35 87.050 323.700 7295.21 7348.05 376.79 N 10709.73 W 5975042.71 N 361011.32E 5.344 10194.46 13789.54 90.880 324.330 7296.93 7349.77 453.79 N 10765.64 W 5975120.65 N 360956.74 E 4.078 10273.31 13885.23 94.220 325.520 7292.67 7345.51 532.01 N 10820.57 W 5975199.80 N 360903.16 E 3.705 10351.64 13980.96 93.660 329.120 7286.09 7338.93 612.39 N 10872.13 W 5975281.04 N 360852.98 E 3.797 10427.55 14076.73 89.210 330.620 7283.69 7336.53 695.17 N 10920.17 W 5975364.63 N 360806.36 E 4.903 10500.98 14171.86 90.450 329.600 7283.97 7336.81 777.64 N 10967.58 W 5975447.91 N 360760.37 E 1.688 10573.70 14267.46 90.700 329.650 7283.01 7335.85 860.11 N 11015.91 W 5975531.19 N 360713.45 E 0.267 10647.30 14362.98 91.260 330.350 7281.38 7334.22 942.82 N 11063.67 W 5975614.71 N 360667.12 E 0.938 10720.43 14 July, 2004 - 8:16 Page 3 of 6 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 . CD2-31 Your Ref: API 501032049300 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 14457.69 90.700 332.220 7279.76 7332.60 1025.87 N 11109.16W 5975698.52 N 360623.06 E 2.061 10791.55 14553.76 91.560 332.070 7277.87 7330.71 1110.79 N 11154.04 W 5975784.20 N 360579.64 E 0.909 10862.73 14649.34 88.290 333.000 7277.99 7330.83 1195.59 N 11198.12W 5975869.74 N 360537.02 E 3.557 10933.12 14744.44 88.420 332.470 7280.72 7333.56 1280.09 N 11241.66 W 5975954.97 N 360494.92 E 0.574 11002.91 14840.50 89.150 332.320 7282.76 7335.60 1365.19 N 11286.16 W 5976040.82 N 360451.88 E 0.776 11073.80 . 14934.74 90.210 332.990 7283.28 7336.12 1448.90 N 11329.45 W 5976125.26 N 360410.03 E 1.331 11143.07 15030.46 91.130 333.590 7282.16 7335.00 1534.40 N 11372.47 W 5976211.48 N 360368.48 E 1.147 11212.70 15125.90 92.730 333.810 7278.95 7331.79 1619.91 N 11414.73 W 5976297.70 N 360327.69 E 1.692 11281.63 15221.57 93.290 333.940 7273.93 7326.77 1705.68 N 11456.80 W 5976384.18 N 360287.10 E 0.601 11350.46 15317.07 93.100 333.680 7268.60 7321.44 1791.24 N 11498.89 W 5976470.45 N 360246.48 E 0.337 11419.24 15412.51 91 .430 333.440 7264.83 7317.67 1876.63 N 11541.35 W 5976556.55 N 360205.49 E 1.768 11488.31 15508.13 91.740 332.880 7262.19 7315.03 1961.92 N 11584.50 W 5976642.56 N 360163.80 E 0.669 11557.99 15603.99 90.820 330.880 7260.05 7312.89 2046.44 N 11629.67W 5976727.84 N 360120.08 E 2.296 11629.31 15699.04 90.320 330.970 7259.10 7311.94 2129.50 N 11675.86 W 5976811.69 N 360075.33 E 0.534 11701.09 15794.78 89.150 331.340 7259.54 7312.38 2213.36 N 11722.04 W 5976896.33 N 360030.58 E 1.282 11773.14 15890.61 89.770 331.000 7260.45 7313.29 2297.31 N 11768.25 W 5976981.05 N 359985.81 E 0.738 11845.24 15986.44 90.460 331.110 7260.25 7313.09 2381.17 N 11814.63 W 5977065.69 N 359940.88 E 0.729 11917.47 16082.00 91.010 331.100 7259.03 7311.87 2464.83 N 11860.80 W 5977150.13 N 359896.14 E 0.576 11989.44 16176.31 91.740 331.190 7256.77 7309.61 2547.40 N 11906.30 W 5977233.47 N 359852.06 E 0.780 12060.40 16272.23 90.390 331.360 7254.98 7307.82 2631.50 N 11952.39 W 5977318.34 N 359807.42 E 1.419 12132.45 16365.68 90.940 331.120 7253.90 7306.74 2713.42 N 11997.35 W 5977401.02 N 359763.87 E 0.642 12202.68 16461.12 89.650 331.930 7253.41 7306.25 2797.31 N 12042.85 W 5977485.67 N 359719.81 E 1.596 12274.09 . 16558.30 89.340 331.130 7254.26 7307.10 2882.73 N 12089.18 W 5977571.88 N 359674.95 E 0.883 12346.81 16654.05 90.020 331.030 7254.80 7307.64 2966.54 N 12135.48 W 5977656.47 N 359630.09 E 0.718 12418.95 16747.20 90.260 330.170 7254.57 7307.41 3047.69 N 12181.21 W 5977738.39 N 359585.76 E 0.959 12489.64 16843.12 90.630 329.630 7253.83 7306.67 3130.67 N 12229.31 W 5977822.18 N 359539.08 E 0.682 12563.19 16939.80 88.980 331.540 7254.15 7306.99 3214.88 N 12276.79 W 5977907.19 N 359493.05 E 2.611 12636.58 17035.46 89.340 331.300 7255.56 7308.40 3298.88 N 12322.55 W 5977991.96 N 359448.74 E 0.452 12708.27 17130.81 88.530 332.800 7257.33 7310.17 3383.09 N 12367.23 W 5978076.92 N 359405.50 E 1.788 12779.02 17226.33 88.970 332.620 7259.41 7312.25 3467.96 N 12411.01 W 5978162.52 N 359363.18 E 0.498 12849.16 17321.88 89.520 332.920 7260.67 7313.51 3552.91 N 12454.73 W 5978248.21 N 359320.92 E 0.656 12919.26 17417.25 90.020 332.310 7261.05 7313.89 3637.59 N 12498.59 W 5978333.63 N 359278.51 E 0.827 12989.41 17510.94 90.390 331.760 7260.72 7313.56 3720.34 N 12542.53 W 5978417.12 N 359236.00 E 0.708 13058.97 17606.48 91.000 331.610 7259.56 7312.40 3804.44 N 12587.84 W 5978501.99 N 359192.13 E 0.657 13130.28 17700.90 90.080 331.570 7258.67 7311.51 3887.49 N 12632.76 W 5978585.79 N 359148.64 E 0.975 13200.86 14 July, 2004 - 8:16 Page 4 of 6 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31 Your Ref: API 501032049300 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 17796.72 90.510 330.270 7258.18 7311.02 3971.22 N 12679.33 W 5978670.31 N 359103.51 E 17890.92 89.090 331.510 7258.51 7311.35 4053.52 N 12725.16 W 5978753.38 N 359059.10 E 17989.77 89.900 331 .260 7259.38 7312.22 4140.29 N 12772.49 W 5978840.95 N 359013.25 E 18085.12 90.520 330.790 7259.03 7311.87 4223.71 N 12818.68 W 5978925.14 N 358968.49 E v 18131.00 90.520 330.790 7258.61 .,/ 7311.45 4263.75 N 12841.07 W 5978965.56 N 358946.79 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 289.970° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 18131.00ft., The Bottom Hole Displacement is 13530.44ft., in the Direction of 288.368° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7956.83 8021.41 18131.00 134.88 S 142.21 S 4263.75 N Tie On Point Window Point Projected Survey 4689.56 4724.73 7311.45 5911.10W 5964.77 W 12841.07 W North Slope, Alaska Dogleg Vertical Rate Section Comment (0/100ft) 1 .429 13273.23 2.001 13344.40 0.858 13418.53 0.816 13490.43 0.000 13525.15 Projected Survey . . 14 July, 2004 - 8:16 Page 5 of 6 DrillQuest 3.03.06.002 Alaska North Slope Survey tool program for CD2-31 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 712.00 0.00 709.81 To Measured Vertical Depth Depth (ft) (ft) 712.00 18131.00 709.81 7311.45 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2·31 Your Ref: API 501032049300 Job No. AKZZ0003109992, Surveyed: 24 June, 2004 North Slope, Alaska Survey Tool Description CB-SS-Gyro (CD2-31 PB1) MWD+IIFR+MS+SAG (CD2-31 PB1) . . 14 July, 2004 - 8:16 Page 6 of 6 Dril/Quest 3.03.06.002 . . 16-Jul-04 AOGCC Robin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well CD2-31 PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 13,245.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 DateJCn \"'~ ~ Signed ??LUJ OfLI I Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager :iÀ?!() 'vf-,03'·2- Attachment(s) Halliburton Sperry-Sun Alaska North Slope North Slope, Alaska Alpine CD-2 CD2-31PB1 . Job No. AKZZ0003109992, Surveyed: 12 June, 2004 Survey Report 14 July, 2004 Your Ref: API 501032049370 Surface Coordinates: 5974482.74 N, 371713.04 E (70020' 18.6650" N, 151002'27.5128" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid) Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True) Kelly Bushing Elevation: 52. 84ft above Mean Sea Level Kelly Bushing Elevation: 52. 84ft above Project V Reference Kelly Bushing Elevation: 52. 84ft above Structure spe..........y-suil'! DFUL.L.ING SERVICES A Halliburton Company SurveyRe~svy405 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -52.84 0.00 0.00 N 0.00 E 5974482.74 N 371713.04 E 0.00 CB-SS-Gyro 78.00 0.400 23.000 25.16 78.00 0.25 N 0.11 E 5974482.99 N 371713.15 E 0.513 -0.01 170.00 0.200 295.000 117.16 170.00 0.61 N 0.09 E 5974483.35 N 371713.14 E 0.479 0.13 263.00 0.300 222.000 210.16 263.00 0.50 N 0.22W 5974483.25 N 371712.82 E 0.331 0.38 353.00 1.000 297.000 300.15 352.99 0.68 N 1.08W 5974483.44 N 371711.97 E 1.074 1.25 . 443.00 4.150 302.000 390.05 442.89 2.77 N 4.54W 5974485.58 N 371708.54 E 3.506 5.21 534.00 5.400 290.000 480.73 533.57 5.98 N 11.36 W 5974488.91 N 371701.78 E 1.751 12.72 623.00 7.800 274.000 569.15 621.99 7.83 N 21.32 W 5974490.93 N 371691.85 E 3.373 22.71 712.00 10.800 266.000 656.97 709.81 7.67 N 35.67 W 5974491.02 N 371677.51 E 3.663 36.14 MWD+IIFR+MS+SAG 792.16 11 .190 267.220 735.66 788.50 6.77 N 50.93 W 5974490.38 N 371662.23 E 0.567 50.18 834.97 12.600 264.480 777.55 830.39 6.12 N 59.73 W 5974489.88 N 371653.43 E 3.547 58.22 924.52 15.480 266.460 864.41 917.25 4.44 N 81.38 W 5974488.57 N 371631.75 E 3.260 78.00 1019.76 21.130 269.440 954.80 1007.64 3.49 N 111.26 W 5974488.13 N 371601.86 E 6.011 105.76 1114.92 27.250 270.530 1041.56 1094.40 3.52 N 150.23 W 5974488.83 N 371562.89 E 6.448 142.40 1208.98 32.860 268.220 1122.95 1175.79 2.93 N 197.31 W 5974489.04 N 371515.81 E 6.089 186.44 1304.65 34.700 266.760 1202.46 1255.30 0.58 N 250.44 W 5974487.61 N 371462.64 E 2.102 235.58 1400.37 37.100 267.850 1280.00 1332.84 2.04S 306.50 W 5974485.94 N 371406.55 E 2.595 287.38 1495.23 41 .460 268.440 1353.41 1406.25 3.97 S 366.51 W 5974485.04 N 371346.51 E 4.613 343.12 1590.73 45.170 269.010 1422.88 1475.72 5.42 S 432.00 W 5974484.71 N 371281.01 E 3.906 404.17 1686.37 48.020 268.830 1488.59 1541.43 6.73 S 501.46 W 5974484.59 N 371211.53 E 2.983 469.01 1780.65 51.240 267.490 1549.65 1602.49 9.06 S 573.24 W 5974483.49 N 371139.72 E 3.583 535.68 1876.17 55.230 266.940 1606.81 1659.65 12.78 S 649.66 W 5974481.07 N 371063.26 E 4.202 606.23 . 1971.57 58.600 268.110 1658.88 1711.72 16.22 S 729.50 W 5974479.00 N 370983.37 E 3.679 680.10 2066.87 60.390 266.040 1707.26 1760.10 20.42 S 811.49W 5974476.20 N 370901.32 E 2.651 755.73 2161.94 60.850 266.140 1753.90 1806.74 26.07 S 894.14 W 5974471.97 N 370818.58 E 0.492 831.48 2257.64 60.630 265.490 1800.68 1853.52 32.16 S 977.41 W 5974467.30 N 370735.22 E 0.636 907.66 2353.13 60.290 267.600 1847.76 1900.60 37.17 S 1060.33 W 5974463.71 N 370652.23 E 1.955 983.88 2448.59 59.710 267.080 1895.49 1948.33 41.01 S 1142.91 W 5974461.29 N 370569.60 E 0.769 1060.18 2543.66 61.290 267.720 1942.31 1995.15 44.76 S 1225.57 W 5974458.96 N 370486.89 E 1.762 1136.59 2639.10 61.550 266.940 1987.96 2040.80 48.66 S 1309.29 W 5974456.49 N 370403.11 E 0.768 1213.94 2733.58 61.200 267.980 2033.23 2086.07 52.34 S 1392.13 W 5974454.23 N 370320.21 E 1.035 1290.55 2828.97 61.810 268.140 2078.74 2131.58 55.18 S 1475.92 W 5974452.82 N 370236.39 E 0.656 1368.33 2924.20 59.960 269.340 2125.07 2177.91 57.01 S 1559.09 W 5974452.41 N 370153.20 E 2.233 1445.87 3019.69 60.300 269.560 2172.63 2225.47 57.81 S 1641.89 W 5974453.03 N 370070.40 E 0.408 1523.42 3115.56 60.400 269.900 2220.06 2272.90 58.20 S 1725.21 W 5974454.06 N 369987.09 E 0.325 1601.60 14 July, 2004 - 8:14 Page 2 of 7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3209.94 60.930 268.030 2266.30 2319.14 59.69 S 1807.47 W 5974453.98 N 369904.82 E 1.816 1678.40 3262.53 61.260 266.810 2291.72 2344.56 61.76 S 1853.46 W 5974452.70 N 369858.80 E 2.126 1720.92 3373.87 61.030 266.760 2345.45 2398.29 67.23 S 1950.82 W 5974448.89 N 369761.36 E 0.210 1810.56 3469.58 60.680 266.730 2392.06 2444.90 71.98 S 2034.28 W 5974445.58 N 369677.83 E 0.367 1887.38 3564.74 60.460 267.500 2438.82 2491.66 76.15 S 2117.05 W 5974442.82 N 369595.00 E 0.742 1963.75 . 3660.61 60.350 267.690 2486.17 2539.01 79.65 S 2200.34 W 5974440.75 N 369511.66 E 0.207 2040.84 3756.06 60.210 268.000 2533.49 2586.33 82.77 S 2283.18 W 5974439.05 N 369428.78 E 0.318 2117.63 3851.63 59.750 268.160 2581.30 2634.14 85.54 S 2365.88 W 5974437.69 N 369346.04 E 0.503 2194.41 3946.90 59.600 268.340 2629.40 2682.24 88.05 S 2448.07 W 5974436.59 N 369263.82 E 0.227 2270.80 4041.91 59.470 269.250 2677.58 2730.42 89.77 S 2529.95 W 5974436.26 N 369181.93 E 0.837 2347.17 4137.49 59.160 269.670 2726.35 2779.19 90.55 S 2612.14 W 5974436.90 N 369099.73 E 0.498 2424.15 4232.83 59.290 269.820 2775.13 2827.97 90.91 S 2694.06 W 5974437.93 N 369017.82 E 0.192 2501.02 4328.69 59.190 269.520 2824.16 2877.00 91.39 S 2776.43 W 5974438.87 N 368935.46 E 0.288 2578.27 4424.35 60.320 268.280 2872.35 2925.19 92.98 S 2859.05 W 5974438.69 N 368852.82 E 1.628 2655.38 4517.66 62.040 268.940 2917.33 2970.17 94.96 S 2940.77 W 5974438.11 N 368771.07 E 1.945 2731.52 4615.56 61.920 269.640 2963.32 3016.16 96.03 S 3027.19 W 5974438.52 N 368684.65 E 0.643 2812.37 4711.34 60.890 269.310 3009.16 3062.00 96.80 S 3111.28W 5974439.19 N 368600.56 E 1.117 2891.15 4805.90 60.220 269.670 3055.64 3108.48 97.53 S 3193.62 W 5974439.86 N 368518.22 E 0.782 2968.29 4901.41 60.380 269.000 3102.96 3155.80 98.49 S 3276.58 W 5974440.32 N 368435.25 E 0.632 3045.93 4996.70 60.510 269.720 3149.97 3202.81 99.42 S 3359.47 W 5974440.81 N 368352.37 E 0.671 3123.51 5092.46 60.150 269.830 3197.37 3250.21 99.75 S 3442.67 W 5974441.91 N 368269.17 E 0.389 3201.60 5187.64 59.650 269.540 3245.10 3297.94 100.20 S 3525.01 W 5974442.86 N 368186.83 E 0.588 3278.84 . 5283.32 59.000 269.480 3293.92 3346.76 100.90 S 3607.30 W 5974443.57 N 368104.54 E 0.681 3355.94 5378.99 58.690 269.690 3343.41 3396.25 101.50 S 3689.17 W 5974444.38 N 368022.67 E 0.375 3432.68 5475.40 58.440 270.860 3393.69 3446.53 101.10 S 3771.43 W 5974446.18 N 367940.43 E 1.067 3510.13 5569.84 57.810 270.620 3443.56 3496.40 1 00.Q7 S 3851.62 W 5974448.58 N 367860.27 E 0.701 3585.85 5665.09 57.550 270.600 3494.49 3547.33 99.21 S 3932.11 W 5974450.82 N 367779.81 E 0.274 3661.79 5760.69 57.540 271.450 3545.79 3598.63 97.77 S 4012.76 W 5974453.64 N 367699.19 E 0.750 3738.09 5855.70 57.560 271.000 3596.77 3649.61 96.05 S 4092.92 W 5974456.73 N 367619.08 E 0.400 3814.01 5951 .24 57.740 271.380 3647.89 3700.73 94.38 S 4173.61 W 5974459.78 N 367538.42 E 0.385 3890.43 6046.24 57.820 272.640 3698.55 3751.39 91.56 S 4253.93 W 5974463.98 N 367458.16 E 1.125 3966.88 6141.67 58.090 272.740 3749.18 3802.02 87.76 S 4334.73 W 5974469.15 N 367377.44 E 0.297 4044.12 6237.02 58.270 273.530 3799.45 3852.29 83.33 S 4415.63 W 5974474.97 N 367296.63 E 0.729 4121.67 6330.82 60.110 272.670 3847.50 3900.34 78.98 S 4496.07 W 5974480.70 N 367216.28 E 2.114 4198.75 6426.58 60.950 273.730 3894.61 3947.45 74.32 S 4579.31 W 5974486.78 N 367133.13 E 1.303 4278.58 14 July, 2004 - 8:14 Page 3 of 7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2· CD2-31PB1 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6523.77 60.860 273.880 3941 .87 3994.71 68.69 S 4664.04 W 5974493.86 N 367048.50 E 0.164 4360.15 6618.80 61.450 273.350 3987.71 4040.55 63.44 S 4747.12 W 5974500.53 N 366965.53 E 0.790 4440.02 6714.10 61.650 273.290 4033.11 4085.95 58.59 S 4830.77 W 5974506.81 N 366881.98 E 0.217 4520.29 6810.30 61.680 273.440 4078.77 4131.61 53.62 S 4915.30 W 5974513.23 N 366797.55 E 0.141 4601.44 6905.71 63.300 269.200 4122.86 4175.70 51.69 S 4999.87 W 5974516.60 N 366713.02 E 4.291 4681.58 . 7001.05 63.770 267.890 4165.35 4218.19 53.86 S 5085.18 W 5974515.89 N 366627.68 E 1.325 4761.03 7096.58 63.210 267.970 4207.99 4260.83 56.95 S 5170.61 W 5974514.26 N 366542.21 E 0.591 4840.26 7192.30 62.520 267.180 4251.64 4304.48 60.55 S 5255.72 W 5974512.12 N 366457.05 E 1.029 4919.02 7287.93 62.080 266.840 4296.10 4348.94 64.97 S 5340.28 W 5974509.15 N 366372.43 E 0.557 4996.99 7383.57 61.740 266.090 4341.13 4393.97 70.17 S 5424.49 W 5974505.39 N 366288.14 E 0.778 5074.36 7479.17 60.320 263.650 4387.44 4440.28 77.63 S 5507.78 W 5974499.35 N 366204.74 E 2.682 5150.09 7574.75 58.880 262.900 4435.80 4488.64 87.28 S 5589.65 W 5974491.10 N 366122.71 E 1.652 5223.74 7670.32 58.790 261.890 4485.26 4538.10 98.10 S 5670.71 W 5974481.67 N 366041.48 E 0.909 5296.23 7765.96 58.260 261.070 4535.20 4588.04 110.19 S 5751.37 W 5974470.97 N 365960.62 E 0.917 5367.92 7861.34 57.990 260.980 4585.57 4638.41 122.82 S 5831.38 W 5974459.70 N 365880.41 E 0.294 5438.80 7956.83 57.230 261.820 4636.72 4689.56 134.88 S 5911.10 W 5974449.01 N 365800.49 E 1.089 5509.61 8051.23 56.990 262.320 4687.98 4740.82 145.82 S 5989.61 W 5974439.42 N 365721.81 E 0.512 5579.67 8147.52 57.040 262.230 4740.40 4793.24 156.68 S 6069.65 W 5974429.93 N 365641.60 E 0.094 5651.18 8243.20 57.270 263.510 4792.30 4845.14 166.65 S 6149.41 W 5974421.32 N 365561.68 E 1.149 5722.74 8338.88 57.730 264.110 4843.71 4896.55 175.35 S 6229.64 W 5974413.99 N 365481.32 E 0.715 5795.17 8370.99 59.990 267.350 4860.31 4913.15 177.39 S 6257.04 W 5974412.43 N 365453.88 E 11.140 5820.23 . 8402.18 62.220 274.110 4875.40 4928.24 177.02 S 6284.32 W 5974413.26 N 365426.62 E 20.273 5845.99 8433.50 62.030 276.220 4890.04 4942.88 174.53 S 6311.89 W 5974416.22 N 365399.09 E 5.986 5872.76 8529.88 60.620 275.830 4936.29 4989.13 165.65 S 6395.98 W 5974426.54 N 365315.16 E 1.505 5954.82 8625.33 59.700 275.480 4983.78 5036.62 157.49 S 6478.37 W 5974436.10 N 365232.93 E 1.015 6035.05 8720.62 60.100 269.640 5031.60 5084.44 153.82 S 6560.67 W 5974441.18 N 365150.70 E 5.318 6113.65 8816.11 61.650 263.950 5078.11 5130.95 158.52 S 6643.90 W 5974437.92 N 365067.40 E 5.452 6190.28 8909.37 61.270 263.560 5122.66 5175.50 167.43 S 6725.34 W 5974430.40 N 364985.82 E 0.549 6263.78 9004.61 60.630 262.980 5168.91 5221.75 177.18 S 6808.03 W 5974422.06 N 364902.98 E 0.857 6338.16 9099.34 59.350 262.790 5216.29 5269.13 187.34 S 6889.43 W 5974413.29 N 364821.42 E 1.362 6411.19 9198.67 58.450 262.570 5267.60 5320.44 198.18 S 6973.78 W 5974403.90 N 364736.89 E 0.926 6486.78 9292.94 57.620 263.180 5317.50 5370.34 208.10 S 7053.14 W 5974395.34 N 364657.37 E 1.038 6557.98 9389.34 56.960 263.090 5369.59 5422.43 217.79 S 7133.67 W 5974387.02 N 364576.69 E 0.689 6630.35 9485.09 56.740 263.820 5421.95 5474.79 226.93 S 7213.31 W 5974379.25 N 364496.90 E 0.678 6702.09 9580.66 56.880 263.330 5474.27 5527.11 235.88 S 7292.79 W 5974371.66 N 364417.28 E 0.453 6773.73 14 July, 2004 - 8:14 Page 4 of 7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9676.04 57.170 263.460 5526.18 5579.02 245.09 S 7372.27 W 5974363.82 N 364337.65 E 0.325 6845.29 9771.46 57.120 264.100 5577.95 5630.79 253.77 S 7451.96 W 5974356.50 N 364257.83 E 0.566 6917.21 9866.78 57.100 264.800 5629.71 5682.55 261.51 S 7531.62 W 5974350.12 N 364178.04 E 0.617 6989.45 9962.39 57.030 266.130 5681.70 5734.54 267.86 S 7611.61 W 5974345.15 N 364097.96 E 1.170 7062.46 10058.09 57.270 267.970 5733.61 5786.45 271.99 S 7691.90 W 5974342.38 N 364017.61 E 1.635 7136.50 . 10153.22 57.650 267.700 5784.78 5837.62 275.02 S 7772.04 W 5974340.73 N 363937.43 E 0.466 7210.79 10248.93 58.060 268.520 5835.71 5888.55 277.69 S 7853.03 W 5974339.44 N 363856.41 E 0.842 7286.00 10280.31 59.770 271.090 5851.91 5904.75 277.78 S 7879.90 W 5974339.81 N 363829.54 E 8.881 7311.22 10311.83 62.070 275.170 5867.23 5920.07 276.27 S 7907.39 W 5974341.80 N 363802.08 E 13.460 7337.58 10344.01 61.900 276.030 5882.35 5935.19 273.49 S 7935.67 W 5974345.05 N 363773.85 E 2.418 7365.10 10436.78 60.710 276.380 5926.89 5979.73 264.70 S 8016.57 W 5974355.23 N 363693.12 E 1.325 7444.14 10535.08 60.800 273.480 5974.92 6027.76 257.33 S 8102.01 W 5974364.06 N 363607.82 E 2.576 7526.96 10566.93 61.150 268.250 5990.38 6043.22 256.91 S 8129.84 W 5974364.96 N 363580.00 E 14.399 7553.26 10598.40 61.240 264.730 6005.55 6058.39 258.60 S 8157.36 W 5974363.74 N 363552.45 E 9.805 7578.55 10630.70 60.740 264.370 6021.21 6074.05 261.28 S 8185.48 W 5974361.54 N 363524.29 E 1.829 7604.06 10662.47 60.460 263.670 6036.81 6089.65 264.17 S 8213.00 W 5974359.13 N 363496.72 E 2.112 7628.95 10694.33 59.550 262.780 6052.74 6105.58 267.42 S 8240.40 W 5974356.34 N 363469.27 E 3.743 7653.59 10726.18 59.140 262.410 6068.98 6121.82 270.95 S 8267.57 W 5974353.27 N 363442.04 E 1.630 7677.92 10821.68 59.250 262.200 6117.88 6170.72 281.93 S 8348.86 W 5974343.68 N 363360.58 E 0.221 7750.57 10916.54 59.160 263.380 6166.45 6219.29 292.16 S 8429.70 W 5974334.84 N 363279.57 E 1.073 7823.05 11010.53 59.330 263.930 6214.51 6267.35 301.09 S 8509.98 W 5974327.29 N 363199.16 E 0.534 7895.46 11107.44 58.970 263.930 6264.21 6317.05 309.89 S 8592.71 W 5974319.91 N 363116.29 E 0.371 7970.21 . 11203.25 58.670 265.600 6313.82 6366.66 317.37 S 8674.33 W 5974313.83 N 363034.55 E 1.524 8044.37 11298.46 58.270 266.440 6363.61 6416.45 323.00 S 8755.29 W 5974309.58 N 362953.51 E 0.861 8118.53 11394.25 58.790 267.260 6413.61 6466.45 327.49 S 8836.86 W 5974306.49 N 362871.87 E 0.910 8193.67 11489.58 58.490 266.830 6463.22 6516.06 331.68 S 8918.16 W 5974303.68 N 362790.51 E 0.497 8268.65 11585.35 58.330 266.810 6513.39 6566.23 336.21 S 8999.61 W 5974300.55 N 362708.99 E 0.168 8343.66 11680.87 57.920 268.420 6563.84 6616.68 339.59 S 9080.65 W 5974298.56 N 362627.91 E 1.494 8418.67 11776.13 58.180 269.100 6614.25 6667.09 341.34 S 9161 .46 W 5974298.19 N 362547.08 E 0.664 8494.02 11871.52 59.080 269.890 6663.90 6716.74 342.05 S 9242.90 W 5974298.87 N 362465.64 E 1.179 8570.32 11966.84 59.730 271.010 6712.42 6765.26 341 .40 S 9324.95 W 5974300.92 N 362383.61 E 1.220 8647.66 12062.80 60.400 271.030 6760.30 6813.14 339.92 S 9408.09 W 5974303.83 N 362300.51 E 0.698 8726.31 12158.31 59.870 271 .970 6807.86 6860.70 337.76 S 9490.89 W 5974307.41 N 362217.76 E 1.018 8804.86 12251.25 59.690 271.040 6854.64 6907.48 335.65 S 9571.17W 5974310.89 N 362137.53 E 0.886 8881.04 12348.66 60.040 270.880 6903.55 6956.39 334.24 S 9655.40 W 5974313.74 N 362053.33 E 0.386 8960.69 14 July, 2004 - 8:14 Page 5 of 7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/10aft) 12444.38 60.420 270.800 6951.07 7003.91 333.02 S 9738.48 W 5974316.38 N 361970.29 E 0.404 9039.19 12539.84 60.100 270.240 6998.43 7051.27 332.26 S 9821.36 W 5974318.55 N 361887.43 E 0.610 9117.34 12635.42 58.830 269.400 7046.99 7099.83 332.52 S 9903.69 W 5974319.71 N 361805.11 E 1.529 9194.63 12731.23 58.580 267.780 7096.76 7149.60 334.53 S 9985.53 W 5974319.09 N 361723.25 E 1 .468 9270.86 12826.42 57.780 266.670 7146.95 7199.79 338.44 S 10066.31 W 5974316.56 N 361642.41 E 1.299 9345.45 . 12922.05 57.010 266.510 7198.48 7251.32 343.24 S 10146.73 W 5974313.15 N 361561.92 E 0.817 9419.40 13017.50 56.980 267.000 7250.47 7303.31 347.77 S 10226.65 W 5974309.99 N 361481.94 E 0.432 9492.96 13113.03 56.400 268.280 7302.93 7355.77 351.06 S 10306.41 W 5974308.06 N 361402.13 E 1.274 9566.81 13172.00 56.120 267.650 7335.69 7388.53 352.80 S 10355.42 W 5974307.16 N 361353.10 E 1.007 9612.27 13245.00 56.120 267.650 7376.38 7429.22 355.28 S 10415.97 W 5974305.71 N 361292.51 E 0.000 9668.34 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 289.970° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13245.00ft., The Bottom Hole Displacement is 1 0422.03ft., in the Direction of 268.046° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) . Comment 13245.00 7429.22 355.28 S 10415.97 W Projected Survey 14 July, 2004 - 8:14 Page 6 of 7 DrillQuest 3.03.06.002 Alaska North Slope Survey tool program for CD2-31 PS1 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 712.00 0.00 709.81 To Measured Vertical Depth Depth (ft) (ft) 712.00 13245.00 709.81 7429.22 Halliburton Sperry-Sun Survey Report for Alpine CD-2· CD2-31P81 Your Ref: API 501032049370 Job No. AKZZ0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Survey Tool Description CB-SS-Gyro MWD+IIFR+MS+SAG . . 14 July, 2004 . 8:14 Page 7 of 7 DrillQuest 3.03.06.002 . . 16-Jul-04 AOGCC Robin Deason 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well CD2-31 PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 13,245.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. ::Ojn~~9¡;L Signed LJ ðiLI Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~"O¥l--:O:~).... Halliburton Sperry-Sun Alaska North Slope North Slope, Alaska Alpine CD-2 CD2-31PB1 MWD . Job No. AKMW0003109992, Surveyed: 12 June, 2004 Survey Report 13 July, 2004 :0 c') (" _. Your Ref: AP/501032049370 Surface Coordinates: 5974482.74 N, 371713.04 E (70· 20'18.6650" N, 151· 02' 27.5128" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . I ð C>() V Surface Coordinates relative to Project H Reference: 974482.74 N, 128286.96 W (Grid) Surface Coordinates relative to Structure: 39.75 N, 5.13 W (True) Kelly Bushing Elevation: 52.84ft above Mean Sea Level Kelly Bushing Elevation: 52.84ft above Project V Reference Kel/y Bushing Elevation: 52.84ft above Structure SpE!.F'""F'""'J-SU·1"1 DRIL.L.ING seRVices A Halliburton Company Survey Ref: svy413 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -52.84 0.00 0.00 N 0.00 E 5974482.74 N 371713.04 E 0.00 CB-SS-Gyro 78.00 0.400 23.000 25.16 78.00 0.25 N 0.11 E 5974482.99 N 371713.15 E 0.513 -0.01 170.00 0.200 295.000 117.16 170.00 0.61 N 0.09 E 5974483.35 N 371713.14 E 0.479 0.13 263.00 0.300 222.000 210.16 263.00 0.50 N 0.22W 5974483.25 N 371712.82 E 0.331 0.38 353.00 1.000 297.000 300.15 352.99 0.68 N 1.08W 5974483.44 N 371711.97 E 1.074 1.25 . 443.00 4.150 302.000 390.05 442.89 2.77 N 4.54W 5974485.58 N 371708.54 E 3.506 5.21 534.00 5.400 290.000 480.73 533.57 5.98 N 11.36 W 5974488.91 N 371701.78 E 1.751 12.72 623.00 7.800 274.000 569.15 621.99 7.83 N 21.32 W 5974490.93 N 371691.85 E 3.373 22.71 712.00 10.800 266.000 656.97 709.81 7.67 N 35.67 W 5974491.02 N 371677.51 E 3.663 36.14 MWD Magnetic 792.16 11.380 267.750 735.63 788.47 6.83 N 51.06 W 5974490.45 N 371662.10 E 0.837 50.33 834.97 12.790 264.950 777.49 830.33 6.25 N 60.00 W 5974490.02 N 371653.15 E 3.566 58.53 924.52 15.680 267.180 864.29 917.13 4.78N 81.97 W 5974488.93 N 371631.16 E 3.284 78.67 1019.76 21.340 270.120 954.56 1 007.40 4.19 N 112.18 W 5974488.84 N 371600.95 E 6.021 106.86 1114.92 27.480 271.360 1041.18 1094.02 4.74 N 151.48 W 5974490.08 N 371561.66 E 6.474 143.99 1208.98 33.100 268.620 1122.37 1175.21 4.64 N 198.89 W 5974490.78 N 371514.26 E 6.152 188.52 1304.65 34.950 266.470 1201.66 1254.50 2.32 N 252.36 W 5974489.38 N 371460.75 E 2.306 237.98 1400.37 37.350 267.650 1278.94 1331.78 0.56 S 308.75 W 5974487.47 N 371404.33 E 2.611 289.99 1495.23 41.720 268.260 1352.09 1404.93 2.69S 369.08 W 5974486.36 N 371343.97 E 4.625 345.97 1590.73 45.430 268.990 1421.26 1474.10 4.26S 434.88 W 5974485.92 N 371278.15 E 3.920 407.27 1686.37 48.290 268.920 1486.65 1539.49 5.53 S 504.64 W 5974485.84 N 371208.37 E 2.991 472.41 1780.65 51.510 267.320 1547.37 1600.21 7.92 S 576.71 W 5974484.69 N 371136.28 E 3.654 539.33 1876.17 55.500 267.010 1604.17 1657.01 11.73 S 653.39 W 5974482.20 N 371059.55 E 4.185 610.10 . 1971.57 58.880 268.060 1655.86 1708.70 15.16 S 733.48 W 5974480.13 N 370979.41 E 3.662 684.20 2066.87 60.660 266.950 1703.84 1756.68 18.75 S 815.74 W 5974477.95 N 370897.10 E 2.122 760.29 2161.94 61.140 266.960 1750.08 1802.92 23.16 S 898.69 W 5974474.96 N 370814.09 E 0.505 836.74 2257.64 60.910 265.010 1796.44 1849.28 29.02 S 982.20 W 5974470.53 N 370730.49 E 1.799 913.23 2353.13 60.580 267.550 1843.11 1895.95 34.43 S 1065.32 W 5974466.54 N 370647.28 E 2.346 989.51 2448.59 60.000 267.740 1890.42 1943.26 37.84 S 1148.17 W 5974464.55 N 370564.40 E 0.632 1066.21 2543.66 61.580 268.340 1936.82 1989.66 40.67 S 1231.09W 5974463.14 N 370481.43 E 1.751 1143.18 2639.10 61.830 267.640 1982.06 2034.90 43.62 S 1315.08 W 5974461.62 N 370397.41 E 0.697 1221.11 2733.58 61.490 269.320 2026.91 2079.75 45.83 S 1398.20 W 5974460.84 N 370314.26 E 1.606 1298.48 2828.97 62.110 270.140 2071.98 2124.82 46.22 S 1482.27 W 5974461.88 N 370230.20 E 0.998 1377.35 2924.20 60.240 270.190 2117.90 2170.74 45.98 S 1565.69 W 5974463.55 N 370146.79 E 1.964 1455.85 3019.69 60.580 271.180 2165.05 2217.89 44.99 S 1648.72 W 5974465.97 N 370063.79 E 0.969 1534.22 3115.56 60.680 271.870 2212.07 2264.91 42.77 S 1732.24 W 5974469.62 N 369980.32 E 0.636 1613.48 13 July, 2004· 16:56 Page 2 of7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3209.94 61.220 269.110 2257.90 2310.74 42.06 S 1814.73 W 5974471.73 N 369897.86 E 2.620 1691.25 3262.53 61.550 268.020 2283.09 2335.93 43.22 S 1860.88 W 5974471.36 N 369851.69 E 1.925 1734.23 3373.87 61.030 265.790 2336.58 2389.42 48.49 S 1958.38 W 5974467.76 N 369754.11 E 1.818 1824.07 3469.58 60.680 265.770 2383.19 2436.03 54.64 S 2041.75 W 5974463.04 N 369670.66 E 0.366 1900.32 3564.74 60.460 267.480 2429.95 2482.79 59.52 S 2124.48 W 5974459.58 N 369587.85 E 1.582 1976.41 . 3660.61 60.350 268.370 2477.30 2530.14 62.54 S 2207.79 W 5974457.98 N 369504.51 E 0.815 2053.68 3756.06 60.200 265.670 2524.64 2577.48 66.85 S 2290.55 W 5974455.09 N 369421.68 E 2.461 2130.00 3851.63 59.750 267.250 2572.46 2625.30 71.96 S 2373.14 W 5974451.39 N 369339.02 E 1.507 2205.87 3946.90 59.600 266.540 2620.56 2673.40 76.41 S 2455.25 W 5974448.35 N 369256.84 E 0.662 2281.52 4041.91 59.460 267.750 2668.74 2721.58 80.49 S 2537.03 W 5974445.67 N 369175.00 E 1.108 2357.00 4137.49 59.150 270.570 2717.54 2770.38 81.70 S 2619.20 W 5974445.86 N 369092.82 E 2.558 2433.81 4232.83 59.290 271.570 2766.33 2819.17 80.17 S 2701.10 W 5974448.79 N 369010.97 E 0.913 2511.30 4328.69 59.190 271.290 2815.36 2868.20 78.11 S 2783.44 W 5974452.26 N 368928.67 E 0.272 2589.40 4424.35 60.320 270.590 2863.54 2916.38 76.76 S 2866.07 W 5974455.03 N 368846.08 E 1.340 2667.52 4517.66 62.040 268.290 2908.52 2961.36 77.57 S 2947.81 W 5974455.61 N 368764.34 E 2.839 2744.07 4615.56 61.910 269.070 2954.52 3007.36 79.56 S 3034.20 W 5974455.10 N 368677.92 E 0.716 2824.59 4711.34 60.880 269.340 3000.38 3053.22 80.73 S 3118.28W 5974455.37 N 368593.83 E 1.103 2903.21 4805.90 60.220 272.150 3046.88 3099.72 79.67 S 3200.60 W 5974457.84 N 368511.54 E 2.680 2980.95 4901.41 60.380 271.330 3094.20 3147.04 77.15 S 3283.53 W 5974461.78 N 368428.67 E 0.764 3059.75 4996.70 60.500 271.710 3141.21 3194.05 74.95 S 3366.39 W 5974465.39 N 368345.86 E 0.369 3138.37 5092.46 60.150 272.030 3188.62 3241.46 72.24 S 3449.54 W 5974469.53 N 368262.77 E 0.467 3217.46 5187.64 59.640 270.300 3236.36 3289.20 70.56 S 3531.86 W 5974472.62 N 368180.49 E 1.661 3295.40 . 5283.32 59.000 273.300 3285.19 3338.03 67.98 S 3614.09 W 5974476.60 N 368098.31 E 2.778 3373.57 5378.99 58.680 271.360 3334.70 3387.54 64.65 S 3695.89 W 5974481.33 N 368016.59 E 1.767 3451.58 5475.40 58.430 272.040 3384.99 3437.83 62.21 S 3778.10 W 5974485.18 N 367934.43 E 0.655 3529.68 5569.84 57.810 270.500 3434.87 3487.71 60.43 S 3858.27 W 5974488.33 N 367854.30 E 1.532 3605.64 5665.09 57.540 270.560 3485.80 3538.64 59.69 S 3938.76 W 5974490.45 N 367773.84 E 0.288 3681.54 5760.69 57.530 274.600 3537.14 3589.98 56.06 S 4019.31 W 5974495.46 N 367693.36 E 3.565 3758.49 5855.70 57.560 272.010 3588.13 3640.97 51.44 S 4099.34 W 5974501.45 N 367613.42 E 2.300 3835.28 5951.24 57.730 272.190 3639.26 3692.10 48.48 S 4179.99 W 5974505.78 N 367532.83 E 0.239 3912.10 6046.24 57.820 274.770 3689.92 3742.76 43.60 S 4260.20 W 5974512.03 N 367452.72 E 2.299 3989.15 6141.67 58.090 272.460 3740.56 3793.40 38.50 S 4340.92 W 5974518.51 N 367372.10 E 2.071 4066.75 6237.02 58.270 275.470 3790.84 3843.68 32.90 S 4421.73 W 5974525.50 N 367291.40 E 2.689 4144.62 6330.82 60.110 272.050 3838.89 3891.73 27.64 S 4502.10 W 5974532.13 N 367211.13 E 3.695 4221.95 6426.58 60.950 275.470 3886.02 3938.86 22.16 S 4585.27 W 5974539.03 N 367128.07 E 3.231 4301.99 13 July, 2004 - 16:56 Page 3 of7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6523.77 60.860 273.560 3933.28 3986.12 15.48 S 4669.92 W 5974547.16 N 367043.54 E 1.720 4383.84 6618.80 61.450 274.970 3979.13 4031.97 9.29 S 4752.93 W 5974554.77 N 366960.65 E 1 .440 4463.97 6714.10 61.640 275.030 4024.53 4077.37 1.98 S 4836.40 W 5974563.50 N 366877.32 E 0.207 4544.91 6810.30 61.680 274.820 4070.20 4123.04 5.29 N 4920.75 W 5974572.21 N 366793.10 E 0.197 4626.68 6905.71 63.300 270.360 4114.29 4167.13 9.08 N 5005.26 W 5974577.46 N 366708.67 E 4.480 4707.40 . 7001.05 63.770 269.560 4156.77 4209.61 9.02 N 5090.61 W 5974578.86 N 366623.33 E 0.898 4787.60 7096.58 63.200 269.600 4199.42 4252.26 8.40 N 5176.08 W 5974579.69 N 366537.86 E 0.598 4867.72 7192.30 62.510 266.700 4243.10 4295.94 5.65N 5261.20 W 5974578.41 N 366452.70 E 2.791 4946.79 7287.93 62.070 266.430 4287.57 4340.41 0.58 N 5345.71 W 5974574.78 N 366368.12 E 0.524 5024.48 7383.57 61.730 266.530 4332.62 4385.46 4.60 S 5429.92 W 5974571.04 N 366283.84 E 0.367 5101.86 7479.17 60.320 263.680 4378.93 4431.77 11.72 S 5513.24 W 5974565.35 N 366200.41 E 2.996 5177.73 7574.75 58.870 264.710 4427.31 4480.15 20.06 S 5595.24 W 5974558.41 N 366118.27 E 1.779 5251.96 7670.32 58.790 262.000 4476.78 4529.62 29.52 S 5676.46 W 5974550.34 N 366036.91 E 2.428 5325.06 7765.96 58.260 260.840 4526.72 4579.56 41.69 S 5757.11 W 5974539.55 N 365956.06 E 1.174 5396.71 7861.34 57.990 262.450 4577.09 4629.93 53.46S 5837.24 W 5974529.16 N 365875.74 E 1.461 5468.00 7956.83 57.220 261.670 4628.25 4681.09 64.59 S 5917.10 W 5974519.39 N 365795.70 E 1.061 5539.25 8051.23 56.990 262.860 4679.52 4732.36 75.26 S 5995.64 W 5974510.06 N 365716.99 E 1.086 5609.43 8147.52 57.040 263.390 4731.94 4784.78 84.93 S 6075.83 W 5974501.77 N 365636.65 E 0.465 5681.49 8243.20 57.270 264.550 4783.83 4836.67 93.37 S 6155.76 W 5974494.70 N 365556.58 E 1.047 5753.74 8338.88 57.730 264.760 4835.24 4888.08 100.89 S 6236.11 W 5974488.55 N 365476.12 E 0.515 5826.68 8370.99 59.990 266.730 4851.85 4904.69 102.92 S 6263.51 W 5974486.99 N 365448.68 E 8.781 5851.75 8402.18 62.210 274.680 4866.94 4919.78 102.57 S 6290.78 W 5974487.81 N 365421.42 E 23.416 5877.50 . 8433.50 62.030 276.220 4881.58 4934.42 99.94 S 6318.34 W 5974490.91 N 365393.91 E 4.384 5904.30 8529.88 60.610 278.190 4927.84 4980.68 89.35 S 6402.22 W 5974502.94 N 365310.23 E 2.321 5986.75 8625.33 59.690 277.680 4975.35 5028.19 77.92 S 6484.21 W 5974515.77 N 365228.44 E 1.069 6067.72 8720.62 60.090 271.540 5023.19 5076.03 71.30 S 6566.32 W 5974523.79 N 365146.46 E 5.589 6147.15 8816.11 61.640 267.070 5069.69 5122.53 72.34 S 6649.69 W 5974524.18 N 365063.09 E 4.399 6225.15 8909.37 61.260 266.360 5114.27 5167.11 77.03 S 6731.47 W 5974520.88 N 364981.23 E 0.783 6300.41 9004.61 60.620 263.130 5160.54 5213.38 84.65 S 6814.36 W 5974514.69 N 364898.23 E 3.040 6375.71 9099.34 59.340 262.050 5207.93 5260.77 95.22 S 6895.69 W 5974505.51 N 364816.73 E 1.673 6448.54 9198.67 58.440 262.910 5259.25 5312.09 106.35 S 6980.00 W 5974495.82 N 364732.24 E 1.171 6523.98 9292.94 57.610 262.800 5309.17 5362.01 116.30 S 7059.35 W 5974487.23 N 364652.74 E 0.886 6595.16 9389.34 56.960 262.630 5361.27 5414.11 126.58 S 7139.80 W 5974478.33 N 364572.12 E 0.690 6667.26 9485.09 56.730 265.430 5413.65 5466.49 134.92 S 7219.51 W 5974471.35 N 364492.27 E 2.460 6739.34 9580.66 56.870 262.850 5465.98 5518.82 143.09 S 7299.05 W 5974464.55 N 364412.61 E 2.264 6811.31 13 July, 2004 - 16:56 Page 40f7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 9676.04 57.160 264.440 5517.91 5570.75 151.94 S 7378.57 W 5974457.06 N 364332.96 E 1.431 6883.01 9771.46 57.120 264.990 5569.69 5622.53 159.32 S 7458.38 W 5974451.04 N 364253.03 E 0.486 6955.50 9866.78 57.090 263.220 5621.46 5674.30 167.54 S 7537.99 W 5974444.18 N 364173.29 E 1.559 7027.52 9962.39 57.020 266.890 5673.46 5726.30 174.46 S 7617.90 W 5974438.64 N 364093.27 E 3.222 7100.27 10058.09 57.270 269.090 5725.39 5778.23 177.28 S 7698.24 W 5974437.19 N 364012.90 E 1.949 7174.81 . 10153.22 57.650 268.810 5776.56 5829.40 178.75 S 7778.42 W 5974437.10 N 363932.70 E 0.470 7249.67 10248.93 58.060 269.960 5827.48 5880.32 179.61 S 7859.45 W 5974437.62 N 363851.67 E 1.104 7325.53 10280.31 59.770 271.060 5843.68 5896.52 179.37 S 7886.32 W 5974438.32 N 363824.81 E 6.221 7350.87 10311.83 62.060 274.850 5859.01 5911.85 177.94 S 7913.82 W 5974440.22 N 363797.33 E 12.773 7377.20 10344.01 61.900 277.310 5874.13 5926.97 174.94 S 7942.06 W 5974443.71 N 363769.15 E 6.767 7404.77 1 0436.78 60.710 276.420 5918.67 5971.51 165.21 S 8022.85 W 5974454.82 N 363688.53 E 1.534 7484.03 10535.08 60.800 275.310 5966.70 6019.54 156.44 S 8108.17 W 5974465.04 N 363603.38 E 0.990 7567.21 10566.93 61.140 270.880 5982.16 6035.00 154.94 S 8135.97 W 5974467.02 N 363575.61 E 12.208 7593.85 10598.40 61.240 265.700 5997.33 6050.17 155.76 S 8163.52 W 5974466.67 N 363548.05 E 14.425 7619.46 10630.70 60.740 264.580 6013.00 6065.84 158.16 S 8191.67 W 5974464.76 N 363519.87 E 3.405 7645.10 1 0662.47 60.460 263.830 6028.59 6081.43 160.95 S 8219.20 W 5974462.43 N 363492.29 E 2.238 7670.03 10694.33 59.550 263.280 6044.52 6097.36 164.05 S 8246.62 W 5974459.81 N 363464.82 E 3.224 7694.74 10726.18 59.130 262.800 6060.76 6113.60 167.37 S 8273.82 W 5974456.95 N 363437.57 E 1.849 7719.16 10821.68 59.240 263.070 6109.68 6162.52 177.45 S 8355.21 W 5974448.26 N 363356.02 E 0.269 7792.22 10916.54 59.160 264.300 6158.26 6211.10 186.42 S 8436.20 W 5974440.68 N 363274.89 E 1.117 7865.27 11010.53 59.320 265.260 6206.33 6259.17 193.76 S 8516.63 W 5974434.71 N 363194.35 E 0.894 7938.36 11107.44 58.960 264.810 6256.04 6308.88 200.96 S 8599.50 W 5974428.93 N 363111.36 E 0.545 8013.79 . 11203.25 58.670 267.920 6305.66 6358.50 206.16 S 8681.29 W 5974425.13 N 363029.50 E 2.793 8088.89 11298.46 58.270 269.030 6355.45 6408.29 208.32 S 8762.41 W 5974424.36 N 362948.35 E 1.079 8164.39 11394.25 58.790 269.830 6405.46 6458.30 209.13 S 8844.11 W 5974424.95 N 362866.65 E 0.896 8240.90 11489.58 58.490 267.170 6455.07 6507.91 211.26 S 8925.47 W 5974424.21 N 362785.26 E 2.403 8316.64 11585.35 58.320 268.260 6505.25 6558.09 214.52 S 9006.98 W 5974422.35 N 362703.71 E 0.986 8392.14 11680.87 57.920 271.240 6555.71 6608.55 214.87 S 9088.07 W 5974423.38 N 362622.62 E 2.682 8468.24 11776.13 58.180 271.520 6606.12 6658.96 212.93 S 9168.88 W 5974426.71 N 362541.86 E 0.370 8544.85 11871.52 59.080 272.450 6655.77 6708.61 210.10 S 9250.27 W 5974430.93 N 362460.52 E 1.258 8622.31 11966.84 59.730 272.810 6704.29 6757.13 206.34 S 9332.24 W 5974436.09 N 362378.64 E 0.755 8700.64 12062.80 60.400 271.860 6752.17 6805.01 202.95 S 9415.33 W 5974440.90 N 362295.62 E 1.106 8779.88 12158.31 59.860 273.450 6799.74 6852.58 199.12 S 9498.05 W 5974446.15 N 362212.97 E 1.550 8858.95 12251.25 59.690 270.530 6846.54 6899.38 196.33 S 9578.30 W 5974450.31 N 362132.78 E 2.721 8935.32 12348.66 60.030 270.340 6895.45 6948.29 195.69 S 9662.54 W 5974452.39 N 362048.57 E 0.388 9014.71 13 July, 2004 - 16:56 Page 5 of7 DrillQuest 3.03.06.002 Halliburton Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 12444.38 60.420 270.140 6942.98 6995.82 195.34 S 9745.62 W 5974454.16 N 361965.51 E 0.446 9092.91 12539.84 60.100 271.480 6990.34 7043.18 194.17 S 9828.49 W 5974456.75 N 361882.66 E 1.264 9171.21 12635.42 58.820 271.080 7038.90 7091.74 192.33 S 9910.79 W 5974460.00 N 361800.41 E 1.387 9249.19 12731.23 58.580 267.210 7088.69 7141.53 193.55 S 9992.62 W 5974460.18 N 361718.57 E 3.460 9325.68 12826.42 57.770 266.160 7138.89 7191.73 198.22 S 10073.37 W 5974456.89 N 361637.76 E 1.266 9399.97 . 12922.05 57.000 267.100 7190.43 7243.27 202.96 S 10153.77 W 5974453.53 N 361557.28 E 1.155 9473.93 13017.50 56.980 266.990 7242.43 7295.27 207.09 S 10233.71 W 5974450.77 N 361477.28 E 0.099 9547.65 13113.03 56.390 269.920 7294.91 7347.75 209.24 S 10313.50 W 5974449.98 N 361397.47 E 2.636 9621.90 13172.00 56.120 268.010 7327.67 7380.51 210.13 S 10362.52 W 5974449.93 N 361348.44 E 2.732 9667.67 13245.00 56.120 268.010 7368.36 7421.20 212.23 S 10423.09 W 5974448.86 N 361287.85 E 0.000 9723.88 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to RKB = 52.84' MSL. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 289.970° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13245.00ft., The Bottom Hole Displacement is 10425.25ft., in the Direction of 268.834° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) . Comment 13245.00 7421.20 212.23 S 10423.09 W Projected Survey 13 July, 2004 - 16:56 Page 60f7 DrillQuest 3.03.06.002 Halliburlon Sperry-Sun Survey Report for Alpine CD-2 - CD2-31PB1 MWD Your Ref: API 501032049370 Job No. AKMW0003109992, Surveyed: 12 June, 2004 North Slope, Alaska Alaska North Slope Survey too/program for CD2-31 PB1 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 712.00 0.00 712.00 709.81 13245.00 709.81 CB-SS-Gyro 7421.20 MWD Magnetic . . 13 July, 2004 - 16:56 Page 70f7 DrillQuest 3.03.06.002 Re: CD2-31 (204-082) plug back operations . Subject: Re: CD2-31 (204-082) plug back operations From: Thomas Maunder <tom_maunder@admin.state.ak.us> Date: Mon, 14 Jun 2004 13:44:07 -0800 To: "Johnson, Vern" <Vern.Johnson@conocophillips.com> CC: winton_aubert@admin.state.ak.us, "Kuenzler, Zane A" <Zane.A.Kuenzler@conocophillips.com>, "Alvord, Chip" <Chip.Alvord@conocophillips.com>, "Noel, Brian" <Brian.Noel@conocophillips.com> . Vern, et al: Winton and I have discussed this matter and we conclude that no sundry notice will be required for this activity. You will be accomplishing the operations which you described in you application, although the plug back depth will be shallower due to the high dog-legs. This is a mechanical consideration and such operations have not traditionally required a sundry. Since there will now be some length between the plugs, attention must be given to the placement of the deep plug. Commission practice has been to waive witnessing the tag of a deep plug when it is set on bottom and no problems such as lost circulation are encountered. If the placement of the bottom plug is suspect, plans should be made to tag the TOC and verify its location. Performing the sidetrack will accomplish the tag of the second plug. You have approval to proceed with your operations as planned. Please call with any questions. Tom Maunder, PE AOGCC Johnson, Vern wrote: Tom/Winton, This weekend we changed the plan for drilling and plugback operations on CD2-31. The original plan was to drill 8-1/2" pilot hole through the Alpine for logging purposes, then plug back with a continuous plug from TD to ± 12100' MD. Then the well was to be sidetracked and landed horizontally in the Alpine reservoir. While drilling the pilot hole at ± 8300' MD, several unexpected high dogleg (up to 20°/100) sections were drilled. The decision was made to move the kick off point and plug back depth up hole to mitigate problems associated with the high dog leg. The revised plan was to place a plug on bottom to isolate the Alpine (planned TOC 12745' MD, 242' MD above the top Alpine C). A second plug was to be placed from ± 8500 to 8000' MD to be used as a kick off plug. There are no significant hydrocarbon bearing zones between the plugs. I spoke to Winton Saturday afternoon, we discussed the plan and he gave verbal approval to continue. He suggested that I follow up with an email today. Let me know if you have any questions, or if you need further paperwork on this issue. Vern Johnson CPAI Alpine Drilling 907-265-6081 (w) 907-748-3906 (c) 907-265-1515 (fx) «Johnson, Vern.vcf» I of I 6/21/2004 I :57 PM . . FRANK H. MURKOWSKI, GOVERNOR AI1ASIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. 7'H AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 C. Alvord Alpine Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: Colville River CD2-31 & CD2-31PBl ConocoPhillips Alaska, Inc. Permit No: 204-082 Surface Location: 1875' FNL, 1526' FEL, SEe. 2, TIIN, R4E, UM Bottomhole Location: 2420' FNL, 1255' FWL, SEe. 33, T12N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name CD2-31PH and API number 50-103-20493-70 :&om records, data and logs acquired for Colville River well CD2- 31. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 9 7 (pager). BY ORDER qf. .1HE COMMISSION DATED thisL.2{day of May, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~. 'tECEIVED MAY 1 4 2004 ßsJ 1\'6 STATE OF ALASKA ALASKA OIL & GAS COMMISSION PERMIT TO DRILL 1a. Type of Work: Drill ~ Redrill [J Re-entry 0 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: 1b. Current Well Class: Stratigraphic Test 0 P.O. Box 100360 Anchorage, AK 99510-0360 4a. Location of Well (Governmental Section): Surface: 1875' FNL, 1526' FEL, Sec. 2, T11 N, R4E, UM / Top of Productive Horizon: 1495'FNL, 1694'FEL,Sec.4, T11N, R4E, UM Total Depth: 2420' FNL, 1255' FWL, Sec. 33, T12N, R4E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 371713.04 16. Deviated wells: Kickoff depth: 400 ¡ 18. Casing Program Size Hole 42" 12.25" 8.5" 6.125" 6.125 Casing 16" 9.625" 7" 3.5" 4.5 19 Total Depth MD (It): Casing Structural Conductor Detailed Operations Intermediate Production Uner Perforation Depth MD (ft): 20. Attachments: Filing Fee 0 Property Plat 0 / ./ y- 5974482.7 Zone- ft. Maximum Hole Angle: 91° Soecifications Weight Grade Coupling Length 62.5# H-40 Weld 77' 36# J-55 BTC 3272 26# L-80 BTC-M 13700' 9.3# L-80 EUE-M 13512' 12.6# L-80 IBT-M 5135 PRESENT WELL CONDITION SUMMARY Total Depth TVD (It): Plugs (measured) Length Size BOP SketchL:) Diverter Sketch 0 Drilling program~ Seabed Report 0 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name ~.. C. Alvord Signature d~ r). V7 ~ ExploratoryU Alas¡Br~ftP&e[1J¡§'~ 8Tns. CommÎ~~ Zone 0 Service 0 Developmegt Gas r¡' Single Zone 0 5. Bond: ~ Blanket U Single wf1l1 VTlW1Iæñ Name and Number: Bond No. 59-52-180 CD2-31 & CD2-31 PB1 6. Proposed Depth: 12. FieldlPool(s): MD: 18682' TVD: 7247' Colville River Field 7. Property DeSignation~ . .A7.01 ADL 380075, 387207, ,1M f!t! ç. Álpine River Pool 8. Land Use Permit: /Vrl';..L 13. Approximate Spud Date: 6/4/2004 na 9. Acres in Property: 2560 14. Distance to Nearest Property: 1255' FWL, Sec. 33 10. KB Elevation 15. Distance to Nearest Well within Pool: CD2-30 , 1945 4 (Height above GL): 52 feet 17. Anticipated Pressure (see 20 AAC 25.035) Max. Downhole Pressure: 3324 psig I Max. Surface Pressure: 2561 psig Setting Depth Quantity of Cement Bottom c. f. or sacks TVD MD TVD (including stage data) 37' 114' 114' 37' 3309' 2390' 613 sx AS Lite & 230 sx LiteCrete 37' 13737' 7345' (149 sx 11 ppg LiteCrete, 150 sx 15.8 32' 13544' 7330' ppg G) sx Class G 7329 18672 7310 uncemented (To be completed for Redrill and Re-Entry Operations) Effective Depth MD (It): Effective Depth TVD (It): Junk (measured) Top MD 37' 37' 37' 32' 13537 Cement Volume MD TVD Perforation Depth TVD (ft): Time v. Depth Plot 0 Drilling Fluid Program 0 Date: Shallow Hazard Analysis [J 20 AAC 25.050 requirements 0 Contact Vem Johnson @ 265-6081 Title Alpine Drilling Team Leader Phone Zed- r.17tt Date 5/1'1/0'"( r r Commission Use Only Permit to Drill .. I I ... _ I API Num. ber: ..., . . . .. Permit APP. roval . / See cover letter Number: 2.CJ Lf -Cß 2-t 50- /ó ::.) ~ æ L/ '13- Cø Date: 5, I ¿?J ¿¡ ¿.f- for other requirements Conditions of approval: Samples required 0 Yes r;;;;rNo Mud log required ( 0 Yes g No . _ J",~g," "lfide m~",," ~ Y". ¡¡¡¡NO 0;,""",0" :~Y '"";'~ ~Y" 0 No . Other:~, -:f~/~~~ à()~~'-ðl>\a3S<",,\\.ð'. ß~oafS\ \~\~\~\J\V\ \Sà~ ~ \- ( (_ J. Vj./~_ BY ORDER OF "'-/,1>/-' / Approvedl5'f: 'j V}<.(A COMMISSIONER THE COMMISSION Date: ~ /16)' bY'" \...../ V '-- I 7 7 Form 10-401 Revised 3/2003, Submit In Duplicate ~ ORIGINAL re . CD2-31 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 121/411H I 195/8"C - oe - aSlna nterva Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots as required Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Abnormal Pressure in Low Increase mud weight Surface Formations / >2000' TVD Lost Circulation Low Reduce pump rates, mud rheology, lost circulation material, use of low density cement slurries 8 1/2" H I 1 7" C I t - oe aSI na n erva Event Risk Level Mitigation Strategy Abnormal Pressure in low BOPE drills, Keep mud weight above 9.6 ppg. Surface Formations ./ Check for flow during connections and if needed, >2000' TVD increase mud weight. Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir low Well control drills, increased mud weight. No Pressure mapped faults occur within 700' of the planned wellbore. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole 1 Horizontal Production Hole Event Risk Level Lost circulation Low Hydrogen Sulfide gas Low Miti ation Strate Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheolo ,lost circulation material Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitorin , wei hted swee s. BOPE drills, Keep mud weight above 8.8 ppg. .0/ Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud wei ht. H2S drills, detection systems, alarms, standard well control ractices, mud scaven ers / Hole swabbing on trips Moderate Abnormal Reservoir Pressure Medium .¡ .I ORIGINAL · '. Alpine: CD2-31 & CD2-31 PB1 Procedure 1. Move on Doyon 19. 2. Drill 12 1,4" hole to the surface casing point as per the directional plan. 3. Run and cement 9 5/8" surface casing. 4. Pressure test casing to 2500 psi. 5. Install and test BOPE to minimum 5000 psi. 6. Drill out 20' of new hole. Perform leak off test. 7. Drill 8-1/2" hole through the Alpine interval (LWD: GR/RES/DENSITY/POROSITYPWD) r/ 8. Plug back the pilot hole with two cement plugs 9. Kick off the cement plug with 8-1/2" drilling assembly. 10. Drill 8 W' hole to the intermediate casing point in the Alpine Sand. (LWD tools, GR/RES/PWD) ./ 11. Run and cement 7" casing as per program. Top of cement +1 500 feet MD above Albian 96 formation. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus. 12. Pressure test casing to 3500 psi. 13. BOPE Test to 5000 psi. 14. Run drilling assembly. Drill out and perform FIT to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg. 15. Drill 6-1/8" horizontal section to well TD. (LWD: GR/RES/PWD) 16. Circulate the hole clean and POOH. 17. Pick up and run 4-1/2" 12.6 #, L-80 liner with perforated pup joints and centralization. 18. Pick up liner hanger and liner top packer. Run in hole on drill pipe. 19. Set liner hanger and liner top packer. Pull out of hole 20. Run 3-%", 9.3 #, L-80 tubing with SSSV nipple, gas lift mandrels, sliding sleeve and seal assembly. Space out in liner top packer. 21. Sting in and land hanger. 22. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 23. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 24. Test tubing-casing annulus separately to 3500 psi I 30 mins. 25. Open CMPA sliding sleeve and circulate tubing and annulus to diesel. 26. Set BPV and secure well. Move rig off. ORIGINAL ~ . Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-32 will be the closest well to CD2-31. Well separation is 11.9' @ 500' MD. Accounting for survey uncertainties, the ellipse-to-ellipse separation is 2.4' @ 500' MD. Drillina Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. ¡/ Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular PumpinQ Operations: Incidental fluids developed from drilling operations on well CD2-31 will be injected into a permitted annulus on C02 pad or the class 2 disposal well on CD1 pad. The CD2-31 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 500' of cement fill above the top of the Alpine as per regulations. Upon completion of CD2-31 form 10-403, Application for Sundry Operations, will be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2390') + 1,500 psi = 2,990 psi Pore Pressure = 1,081 psi Therefore Differential = 2991 - 1081 = 1910 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: Wt Connection 85% of 85% of OD (ppf) Grade Range Type Collapse Collapse Burst Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1 ,717 psi 3,520 psi 2.992 psi 7" 26 L-80 3 BTC-Mod 5,410 psi 4.599 psi 7,240 psi 6,154 psi ORfGINAL /. . CD2-31 DRILLING FLUID PROGRAM SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 W' Section - 6 1/8" point - 12 W' Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 8.1-8.8 ppg v PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25-30 Funnel Viscosity 100 - 200 Initial Gels 4-8 10-15 10 minute gels <18 12-20 API Filtrate NC - 10 cc I 30 min 4 - 12 cc/30 min (drilling) NA HPHT Fluid Loss at 160 12-14 cc/30 min PH 8.5-9.0 9.0 -10.0 9.0-9.5 KCL 6% Oil Iwater ratio Approx. 80/20 Suñace Hole: A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining well bore stability. Production Hole Section : The horizontal production interval will be drilled with a 80/20 oil/water ratio M-I Versa-Pro mineral oil based drill-in fluid. The base fluid will consist of high flashpoint (>200 F) mineral oil with 25% by weight calcium chloride as the internal phase. Calcium carbonate bridging material will be added to minimize formation damage. ORIGINAL Colville River Field CD2-31 PH Pilot Hole - Prior to Sidetracking RKB - GL = 37' Wellhead 16" Conductor to 114' 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3309' MD I 2390' TVD cemented to surface 9.8 ppg drilling mud in hole PluQ #2: 600' (11915' 11II1:1), 17 PPQ~ºco¥~r tòeHRZ when in place (HRZ toe at +1-12291' Mp16933' TVe) Cement Plug Top of cement plug dressed off to 12160' MD / 6866' TVD (+/- 59.6º inc.) Top Alpine Reservoir at 13034' MD / 7309' TVD Top of Cement Plug #1 at +/- 12515' MDI 7035' TVD Pilot Hole TD at 13515' MD / 7552' TVD (+/- 59.6º inc.) II Colville River Field CD2-31 Production Well Completion Plan 16" Conductor to 114' 3-16" x 4-16" cross-over, 2 jts below 4-16 Dhanger 3-1/2" Camco TRM-4E SSSV Nipple (2.813" ID) at 1900' TVD=2342' MD -2.813" X-Over -Single 1j.¡"xO.049" 5/5 control line 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3314' MD / 2390' TVD cemented to surface Cameo KBG-2 GLM (2.867" 10) at 3400' TVD for E Dummy with 1" BK-2 Latch 3-1/2" 9.3 ppf L-80 EUEM R3 tubing run with Jet Lube Run'n'Seal pipe dope Cameo KBG-2 GLM (2.867" ID) at 5700' TVD for E Dummy with 1" BK-2 Latch Cameo KBG-2 GLM (2.867" 10) 2 joints above sliding sleeve E Dummy with 1" BK-2 Latch Baker 3-%" CMD sliding sleeve with 2.81 "[)([::Profile set 2 joints above Seal assembly Packer Fh,Jid mix: Diesel in tubing and annulus Upper Completion MD TVD Tubing Hanger 32' 32' 4-W' 12.6 #/ft IBT-Mod Tubing (2) Crossover 3-1/2", 9.3#/ft, EUE-Mod Tubing Camco BAL-O SSSV Nipple 2340' 1900' 3-1/2", 9.3#/ft, EUE-Mod Tubing Camco KBG-2 GLM (2.867" ID) 5306' 3400' 3-1/2", 9.3#/ft, EUE-Mod Tubing Camco KBG-2 GLM (2.867" ID) 9854' 5100' 3-1/2", 9.3#/ft, EUE-Mod Tubing Camco KBG-2 GLM (2.867" ID) 12400' 6983' 3-1/2" tubing joints (2) Baker 3-1/2" CMPA sliding sleeve 12500' 1028' wI 2.81 " X Profile 3-1/2", 9.3#/ft, 1ST-Mod Tubing Seal assembly and no-go shoulder 13534' 7329' Muleshoe 13544' 7330' Lower ComDh;!tion ZXP liner top packer 13531' 1329' Flexloc liner hanger 13547' 7330 4-W', 12.6 #/ft, IBTM tubing 2 jts HES "XN" (2.75" ID) 13647' 7340' 4-]6",12.6 #/ft, ISTM tubing Perforated pups 1 per 4 jtts Baker guide shoe 18672' 7310' Baker ZXP liner top packer Flexloc liner hanger+/- 13537' MD +/-200 MD from the 7" casing shoe TOC @ +/- 9838' MD / 5692' TVD (500' MD above top Albian 96) 7" 26 ppf L-80 BTC Mod Production Casing @ 13737' MD / 7345' TVD @ 85º I 1 Well TD at 18682' MD ! 7310' TVD 4- W' 12.6#/ft L-80 ISTM liner, 1 5ft perforated pup with rigid straight centralizer per 4 joints . . CD2-31 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (Ibs. I (psi) (psi) MDfTVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 3309 I 2390 14.5 1081 1525 7" 13737 I 7345 16.0 3324 2590 N/A 18682 I 7310 16.0 3308 ./ N/A . NOTE: The Doyon 195000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in Ib/gal 0.052 = Conversion from Ib.lgal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1] D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1081 - (0.1 x 2390) = 842 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1] D = [(14.5 x 0.052) - 0.1] x 2390 = 1563 psi OR ASP = FPP - (0.1 x D) = 3324 - (0.1 x 7345') = 2590 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3288 - (0.1 x 7310') = 2576 psi ORIGINAL . . 9 5/8" Surface Casinl! run to 3309' MD 12390' TVD. Cement from 3309' MD to 2809' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2807' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost (1795' MD). Lead slurry: System: Tail slurry: System: (2809'-1795') X 0.3132 fe/ft X 1.5 (50% excess) = 476.4 fe below permafrost 1795' X 0.3132 fe/ft X 4 (300% excess) = 2248.8 fe above permafrost Total volume = 476.4 + 2248.8 = 2725.2 fe => 613 Sx @ 4.45 fe/sk 613 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 fe/sk, Class G + 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9% BWOW1 D044 freeze suppressant 500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 fe annular volume 80' X 0.4341 fe 1ft = 34.7 fe shoe joint volume Total volume = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % S002 accelerator @ 15.8 PPG yielding 1.17 ft3/sk Pilot Hole Cementinl! Reauirements Cement Plug #1: 13515' MD to 12515' MD = 1000'. Cement with Class G + additives @ 15.8 ppg. Assume 15 % excess on open hole volume. Slurry: 1000' X 0.3941 fe/ft X 1.15 (15% excess) = 353.2 ft3 => 395 Sx @ 1.15 ft3/sk Cement Plug #2 : 12515' MD to 11915' MD = 600'. Cement with Class G + additives @ 17 ppg. Assume 15 % excess on open hole volume. Slurry: 600' X 0.3941 fe/ftX 1.15 (15% excess) = 271.9 fe => 237 Sx @ 1.00 fe/sk 7" Intermediate Casinl! run to 13737 MD 17345' TVD Lead cement from 12867' MD to +1- 9838' MD (minimum 500' MD above top of Albian 96 Formation) with 11 PPG LiteCrete. Assume 30% excess annular volume. Tail cement from 13737' MD to +1- 12867' MD (minimum 500' MD above top of Alpine C Formation) with Class G + adds @ 15.8 PPG. Assume 40% excess annular volume. Lead: System: Tail: System: (12867'-9838') X 0.1268 ft3/ft X 1.3 (30% excess) = 499.3 fe annular vol Total volume = 499.3 ft3 = 149 Sx @ 3.35 fe/sk 149 Sx 11 ppg LiteCrete 0.4% D046 antifoamer, 1 % D065 dispersant, 0.01 % B155 retarder and 0.25% D167 fluid loss additive @ 11 PPG yielding 3.35 fe/sk (13737' - 12867') X 0.1268 fe/ft X 1.4 (40% excess) = 154.4 fe annular vol. 80' X 0.2148 ft3/ft = 17.2 ft3 shoe joint volume Total volume = 154.4 + 17.2 = 171.6 fe => ISO Sx @ 1.16 ft3/sk 150 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant, 0.07% B155 retarder and 0.4% DI67 fluid loss additive @ 15.8 PPG yielding 1.15 fe/sk 1 By Weight Of mix Water, all other additiveor~i0r1':rÄ L . . Conoc;pí,illips ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-31 Plan: CD2-31 (ST Pilot) Plan: CD2-31 ST (wp03) Standard Planning Report 13 May, 2004 spar"r"y-sun DAIL-LING SERViCeS A HALUBURTON COMPANY ORIGINAL ~Þ' ConocoPhilUps Engineering Alpine Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Trav. Cylinder North Error Surface: Elliptical Conic Warning Method: Rules Based -750 o ê =ê o o LO :s. ..c: 15. <D o ëiJ Q 12 <D > <D ::::¡ .... I- Co illi Engineering Calculation Method: Error System: Scan Method: Error Surface: Warning Method: Alpine Minimum Curvature ISCWSA Elliptical Conic Rules Based Trav. Cylinder North "2 ~ -6000 -5000 o o o ~ "'+ ::c t o Z -- "7' -1000 ::c "5 o (j) West(-)/East(+) (2000 ftlìn) 55 }~ HALUnt:'fff(tt" (-()MP,,,,,'~,i',\ . . C<>nocJ'Phillips Database: Company: Project: Site: Well: Wellbore: Design: SPERRY SUN HES Planning Report spar"'r"'y-sun DRILL.ING SERVices A HALUBURTON COMPANY EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-31 Plan: CD2-31 (ST Pilot) CD2-31 ST (wp03) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature Project Map System: Geo Datum: Map Zone: Colville River Unit, North Slope Alaska, United States US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Alaska Zone 04 System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Alpine C02 Site Position: From: Map Position Uncertainty: 0.000 ft Northing: Easting: Slot Radius: 5974641.660usft 371696.240 usft O.OOOin Latitude: Longitude: Grid Convergence: 70° 20' 020" N 151° 02' 028" W -0.98 ° Well Plan: CD2-31 ---'^'---'-~- .~-----~~-- 0.000 ft 0.000 ft 0.000 ft 70° 20' 018" N 151° 02' 027" W 0.000 ft Well Position +N/-S +EI-W Position Uncertainty 5974482.770 usfl 371713.040 usfl ft Latitude: Longitude: Ground Level: Northing: Easting: Wellhead Elevation: Well bore '-------_.^---~._----~-.._---------^---_.,'-~---- Plan: CD2-31 (ST Pilot) Magnetics ------~- Model Name Field Strength (nT) Sample Date Declination (0) Dip Angle (0) bggm2003 57424 8/15/2002 24.75 80.59 -------_._._--_.._._-----~_.,_._-~-- CD2-31 ST (wp03) Design Audit Notes: Version: Vertical Section: ---~-~~ _._----,_.~-~~ 2 Phase: PLAN Tie On Depth: 36.100 Depth From (TVD) +N/·S +EI-W Direction (ft) (ft) (ft) (0) 36.100 0.000 0.000 331.860 .--'.----.,---....--------.---.- Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO (ft) (0) (0) (ft) (ft) (ft) (0/10Dft) (0/100ft) (°/1 DOft) (0) Target 36.100 0.000 0.000 36.100 0.000 0.000 0.00 0.00 0.00 0.00 400.000 0.000 0.000 400.000 0.000 0.000 0.00 0.00 0.00 0.00 700.000 9.000 270.000 698.768 0.000 -23.514 3.00 3.00 0.00 270.00 1965.580 59.617 267.984 1710.508 -20.559 -713.534 4.00 4.00 -0.16 357.75 12159.710 59.617 267.984 6866.473 -329.923 -9502.198 0.00 0.00 0.00 0.00 13064.310 59.617 267.984 7324.000 -357.375 -10282.081 0.00 0.00 0.00 0.00 13515.101 59.617 267.984 7552.000 -371.055 -10670.721 0.00 0.00 0.00 0.00 ---~._-- ._---~,-~-- 5/13/200412:18:17PM Page 2 of 7 COMPASS 2003.5 ORIGINAL y ConocoPhillips . . SPERRY_SUN HES Planning Report spel"""l"""y-sun DRILLING seRVices A HALUBURTON COMPANY Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-31 Plan: CD2-31 (ST Pilot) CD2-31 ST (wp03) Local Co-ordinate Reference: TVD Reference: MDReference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Depth Inclination Azimuth Depth +N/-S +E/-W Section Ràte Rate (ft) (0) (0) (ft) (ft) (ft) (ft) (o/100ft) (0/100ft) 36.100 0.000 0.000 36.100 0.000 0.000 0.000 0.00 0.00 0.00 SHL (1875'FNL & 1526'FEL; Sec2-T11N-R4E) 100.000 0.000 0.000 100.000 0.000 0.000 0.000 0.00 0.00 0.00 200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00 300.000 0.000 0.000 300.000 0.000 0.000 0.000 0.00 0.00 0.00 400.000 0.000 0.000 400.000 0.000 0.000 0.000 0.00 0.00 0.00 Begin Dir @ 3.00; 400.010'MD,400.010'TVD 500.000 3.000 270.000 499.954 0.000 -2.617 1.234 3.00 3.00 0.00 600.000 6.000 270.000 599.635 0.000 -10.462 4.934 3.00 3.00 0.00 700.000 9.000 270.000 698.768 0.000 -23.514 11.090 3.00 3.00 0.00 Continue Dir @ 4.00: 700.001'MD, 698.769' TVD 800.000 12.998 269.302 796.911 -0.137 -42.588 19.965 4.00 4.00 -0.70 900.000 16.997 268.929 893.485 -0.547 -68.457 31.803 4.00 4.00 -0.37 1000.000 20.996 268.695 988.020 -1.229 -100.994 46.548 4.00 4.00 -0.23 1100.000 24.995 268.532 1080.055 -2.178 -140.040 64.126 4.00 4.00 -0.16 1200.000 28.995 268.413 1169.141 -3.391 -185.407 84.452 4.00 4.00 -0.12 1300.000 32.995 268.320 1254.845 -4.862 -236.871 107.428 4.00 4.00 -0.09 1400.000 36.995 268.245 1336.749 -6.582 -294.184 132.941 4.00 4.00 -0.07 1500.000 40.994 268.183 1414.454 -8.545 -357.065 160.867 4.00 4.00 -0.06 1600.000 44.994 268.130 1487.581 -10.740 -425.209 191.070 4.00 4.00 -0.05 1700.000 48.994 268.084 1555.774 -13.157 -498.282 223.402 4.00 4.00 -0.05 1800.000 52.994 268.043 1618.702 -15.783 -575.930 257.707 4.00 4.00 -0.04 1900.000 56.994 268.006 1676.056 -18.607 -657.774 293.817 4.00 4.00 -0.04 1965.580 59.617 267.984 1710.508 -20.559 -713.534 318.394 4.00 4.00 -0.03 End Dir, Start Sail @ 59.617; 1965.580' MD, 1710.508' TVD 2000.000 59.617 267.984 1727.917 -21.603 -743.209 331 .468 0.00 0.00 0.00 2100.000 59.617 267.984 1778.495 -24.638 -829.422 369.453 0.00 0.00 0.00 2200.000 59.617 267.984 1829.073 -27.673 -915.635 407.437 0.00 0.00 0.00 2300.000 59.617 267.984 1879.651 -30.707 -1001.848 445.421 0.00 0.00 0.00 2400.000 59.617 267.984 1930.228 -33.742 -1088.061 483.406 0.00 0.00 0.00 2500.000 59.617 267.984 1980.806 -36.777 -1174.274 521.390 0.00 0.00 0.00 2600.000 59.617 267.984 2031.384 -39.812 -1260.487 559.375 0.00 0.00 0.00 2700.000 59.617 267.984 2081.962 -42.846 -1346.700 597.359 0.00 0.00 0.00 2800.000 59.617 267.984 2132.539 -45.881 -1432.913 635.343 0.00 0.00 0.00 2900.000 59.617 267.984 2183.117 -48.916 -1519.126 673.328 0.00 0.00 0.00 3000.000 59.617 267.984 2233.695 -51.950 -1605.339 711.312 0.00 0.00 0.00 3063.872 59.617 267.984 2266.000 -53.889 -1660.405 735.574 0.00 0.00 0.00 C-40 3100.000 59.617 267.984 2284.273 -54.985 -1691.552 749.297 0.00 0.00 0.00 3200.000 59.617 267.984 2334.851 -58.020 -1777.765 787.281 0.00 0.00 0.00 3300.000 59.617 267.984 2385.428 -61.055 -1863.978 825.266 0.00 0.00 0.00 3309.048 59.617 267.984 2390.005 -61.329 -1871.778 828.702 0.00 0.00 0.00 95/8" 3400.000 59.617 267.984 2436.006 -64.089 -1950.191 863.250 0.00 0.00 0.00 3465.234 59.617 267.984 2469.000 -66.069 -2006.431 888.029 0.00 0.00 0.00 C-30 3500.000 59.617 267.984 2486.584 -67.124 -2036.404 901.234 0.00 0.00 0.00 3600.000 59.617 267.984 2537.162 -70.159 -2122.617 939.219 0.00 0.00 0.00 3700.000 59.617 267.984 2587.740 -73.194 -2208.830 977.203 0.00 0.00 0.00 3800.000 59.617 267.984 2638.317 -76.228 -2295.043 1015.188 0.00 0.00 0.00 3900.000 59.617 267.984 2688.895 -79.263 -2381.256 1053.172 0.00 0.00 0.00 4000.000 59.617 267.984 2739.473 -82.298 -2467.469 1091.156 0.00 0.00 0.00 5/13/200412:18:17PM Page 3 of 7 COMPASS 2003.5 ORIGINAL . . ¥ SPERRY SUN HES spe,..,,..,v-sun ConocoPhillips Planning Report DRIL..L..ING seRVices A HAlLIBURTON COMPANY Database: EDM 2003.5 Single User Db Local Co-ordinate Reference: Well Plan: CD2-31 Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52 @ 52.000ft (52) PrOject: Colville River Unit MD Reference: 52 @ 52.000ft (52) Site: Alpine CD2 North Reference: True Well: Plan: CD2-31 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD2-31 (ST Pilot) De$ign: CD2-31 ST (wp03) 4100.000 59.617 267.984 2790.051 -----=85.3"32- -2553.682 1129.141 0.00 0.00 0.00 4186.895 59.617 267.984 2834.000 -87.969 -2628.596 1162.147 0.00 0.00 0.00 C-20 4200.000 59.617 267.984 2840.628 -88.367 -2639.895 1167.125 0.00 0.00 0.00 4300.000 59.617 267.984 2891.206 -91.402 -2726.108 1205.110 0.00 0.00 0.00 4400.000 59.617 267.984 2941.784 -94.437 -2812.321 1243.094 0.00 0.00 0.00 4500.000 59.617 267.984 2992.362 -97.471 -2898.534 1281.078 0.00 0.00 0.00 4600.000 59.617 267.984 3042.940 -100.506 -2984.747 1319.063 0.00 0.00 0.00 4700.000 59.617 267.984 3093.517 -103.541 -3070.959 1357.047 0.00 0.00 0.00 4800.000 59.617 267.984 3144.095 -106.576 -3157.172 1395.032 0.00 0.00 0.00 4900.000 59.617 267.984 3194.673 -109.610 -3243.385 1433.016 0.00 0.00 0.00 5000.000 59.617 267.984 3245.251 -112.645 -3329.598 1471.000 0.00 0.00 0.00 5100.000 59.617 267.984 3295.828 -115.680 -3415.811 1508.985 0.00 0.00 0.00 5200.000 59.617 267.984 3346.406 -118.714 -3502.024 1546.969 0.00 0.00 0.00 5300.000 59.617 267.984 3396.984 -121.749 -3588.237 1584.954 0.00 0.00 0.00 5400.000 59.617 267.984 3447.562 -124.784 -3674.450 1622.938 0.00 0.00 0.00 5500.000 59.617 267.984 3498.140 -127.819 -3760.663 1660.922 0.00 0.00 0.00 5600.000 59.617 267.984 3548.717 -130.853 -3846.876 1698.907 0.00 0.00 0.00 5700.000 59.617 267.984 3599.295 -133.888 -3933.089 1736.891 0.00 0.00 0.00 5800.000 59.617 267.984 3649.873 -136.923 -4019.302 1774.876 0.00 0.00 0.00 5900.000 59.617 267.984 3700.451 -139.958 -4105.515 1812.860 0.00 0.00 0.00 6000.000 59.617 267.984 3751.029 -142.992 -4191.728 1850.844 0.00 0.00 0.00 6100.000 59.617 267.984 3801.606 -146.027 -4277.941 1888.829 0.00 0.00 0.00 6200.000 59.617 267.984 3852.184 -149.062 -4364.154 1926.813 0.00 0.00 0.00 6286.631 59.617 267.984 3896.000 -151.691 -4438.841 1959.720 0.00 0.00 0.00 K-3 MARKER 6300.000 59.617 267.984 3902.762 -152.096 -4450.367 1964.798 0.00 0.00 0.00 6400.000 59.617 267.984 3953.340 -155.131 -4536.580 2002.782 0.00 0.00 0.00 6500.000 59.617 267.984 4003.917 -158.166 -4622.793 2040.767 0.00 0.00 0.00 6600.000 59.617 267.984 4054.495 -161.201 -4709.006 2078.751 0.00 0.00 0.00 6666.244 59.617 267.984 4088.000 -163.211 -4766.117 2103.913 0.00 0.00 0.00 BASAL K-3 SS 6700.000 59.617 267.984 4105.073 -164.235 -4795.219 2116.735 0.00 0.00 0.00 6721.605 59.617 267.984 4116.000 -164.891 -4813.845 2124.942 0.00 0.00 0.00 K-2 MARKER 6800.000 59.617 267.984 4155.651 -167.270 -4881 .432 2154.720 0.00 0.00 0.00 6891.640 59.617 267.984 4202.000 -170.051 -4960.437 2189.529 0.00 0.00 0.00 BASE K-2 SEQUENCE 6900.000 59.617 267.984 4206.229 -170.305 -4967.645 2192.704 0.00 0.00 0.00 7000.000 59.617 267.984 4256.806 -173.340 -5053.858 2230.689 0.00 0.00 0.00 7100.000 59.617 267.984 4307.384 -176.374 -5140.071 2268.673 0.00 0.00 0.00 7200.000 59.617 267.984 4357.962 -179.409 -5226.284 2306.657 0.00 0.00 0.00 7300.000 59.617 267.984 4408.540 -182.444 -5312.497 2344.642 0.00 0.00 0.00 7400.000 59.617 267.984 4459.117 -185.478 -5398.710 2382.626 0.00 0.00 0.00 7500.000 59.617 267.984 4509.695 -188.513 -5484.923 2420.611 0.00 0.00 0.00 7600.000 59.617 267.984 4560.273 -191.548 -5571.136 2458.595 0.00 0.00 0.00 7700.000 59.617 267.984 4610.851 -194.583 -5657.349 2496.579 0.00 0.00 0.00 7800.000 59.617 267.984 4661.429 -197.617 -5743.562 2534.564 0.00 0.00 0.00 7900.000 59.617 267.984 4712.006 -200.652 -5829.775 2572.548 0.00 0.00 0.00 8000.000 59.617 267.984 4762.584 -203.687 -5915.988 2610.533 0.00 0.00 0.00 8100.000 59.617 267.984 4813.162 -206.722 -6002.201 2648.517 0.00 0.00 0.00 8200.000 59.617 267.984 4863.740 -209.756 -6088.414 2686.501 0.00 0.00 0.00 8300.000 59.617 267.984 4914.318 -212.791 -6174.627 2724.486 0.00 0.00 0.00 8400.000 59.617 267.984 4964.895 -215.826 -6260.840 2762.470 0.00 0.00 0.00 8500.000 59.617 267.984 5015.473 -218.861 -6347.053 2800.455 0.00 0.00 0.00 8600.000 59.617 267.984 5066.051 -221.895 -6433.266 2838.439 0.00 0.00 0.00 8700.000 59.617 267.984 5116.629 -224.930 -6519.479 2876.423 0.00 0.00 0.00 8800.000 59.617 267.984 5167.206 . ~27 .965 __ -6605.692 2914.40-ª----- 0.00 0.00 0.00 5/13/200412:18:17PM Page 4 of 7 COMPASS 2003.5 ORIGINAL y . SPERRY SUN HES . spel""'l""'y-sun ConocoPhillips Planning Report DRILL.ING SERVICES A HALLIBURTON COMPANY Database: EDM 2003.5 Single User Db Local Co-ordinate Reference: Well Plan: CD2-31 Company: ConocoPhillips Alaska Inc. (Alpine) TVD Reference: 52 @ 52.000ft (52) Project: Colville River Unit MD Reference: 52 @ 52.000ft (52) Site: Alpine CO2 North Reference: True Well: Plan: CD2-31 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD2-31 (ST Pilot) Design: CD2-31 ST (wp03) 8900.000 59.617 267.984 5217.784 -230.999 -6691.905 2952~392 0.00 0.00 0.00 . 9000.000 59.617 267.984 5268.362 -234.034 -6778.118 2990.377 0.00 0.00 0.00 9034.873 59.617 267.984 5286.000 -235.092 -6808.183 3003.623 0.00 0.00 0.00 ALBIAN 97 9100.000 59.617 267.984 5318.940 -237.069 -6864.331 3028.361 0.00 0.00 0.00 9200.000 59.617 267.984 5369.518 -240.104 -6950.544 3066.345 0.00 0.00 0.00 9300.000 59.617 267.984 5420.095 -243.138 -7036.757 3104.330 0.00 0.00 0.00 9400.000 59.617 267.984 5470.673 -246.173 -7122.970 3142.314 0.00 0.00 0.00 9500.000 59.617 267.984 5521.251 -249.208 -7209.183 3180.299 0.00 0.00 0.00 9600.000 59.617 267.984 5571.829 -252.243 -7295.396 3218.283 0.00 0.00 0.00 9700.000 59.617 267.984 5622.406 -255.277 -7381.609 3256.267 0.00 0.00 0.00 9800.000 59.617 267.984 5672.984 -258.312 -7467.822 3294.252 0.00 0.00 0.00 9900.000 59.617 267.984 5723.562 -261.347 -7554.035 3332.236 0.00 0.00 0.00 10000.000 59.617 267.984 5774.140 -264.381 -7640.248 3370.221 0.00 0.00 0.00 10100.000 59.617 267.984 5824.718 -267.416 -7726.461 3408.205 0.00 0.00 0.00 10200.000 59.617 267.984 5875.295 -270.451 -7812.674 3446.190 0.00 0.00 0.00 10300.000 59.617 267.984 5925.873 -273.486 -7898.887 3484.174 0.00 0.00 0.00 10345.725 59.617 267.984 5949.000 -274.873 -7938.308 3501.542 0.00 0.00 0.00 ALBIAN 96 10400.000 59.617 267.984 5976.451 -276.520 -7985.099 3522.158 0.00 0.00 0.00 10500.000 59.617 267.984 6027.029 -279.555 -8071.312 3560.143 0.00 0.00 0.00 10600.000 59.617 267.984 6077.607 -282.590 -8157.525 3598.127 0.00 0.00 0.00 10700.000 59.617 267.984 6128.184 -285.625 -8243.738 3636.112 0.00 0.00 0.00 10800.000 59.617 267.984 6178.762 -288.659 -8329.951 3674.096 0.00 0.00 0.00 10900.000 59.617 267.984 6229.340 -291.694 -8416.164 3712.080 0.00 0.00 0.00 , 11000.000 59.617 267.984 6279.918 -294.729 -8502.377 3750.065 0.00 0.00 0.00 11100.000 59.617 267.984 6330.495 -297.763 -8588.590 3788.049 0.00 0.00 0.00 11200.000 59.617 267.984 6381.073 -300.798 -8674.803 3826.034 0.00 0.00 0.00 11300.000 59.617 267.984 6431.651 -303.833 -8761.016 3864.018 0.00 0.00 0.00 11400.000 59.617 267.984 6482.229 -306.868 -884 7 .229 3902.002 0.00 0.00 0.00 11500.000 59.617 267.984 6532.807 -309.902 -8933.442 3939.987 0.00 0.00 0.00 11600.000 59.617 267.984 6583.384 -312.937 -9019.655 3977.971 0.00 0.00 0.00 11700.000 59.617 267.984 6633.962 -315.972 -9105.868 4015.956 0.00 0.00 0.00 11800.000 59.617 267.984 6684.540 -319.007 -9192.081 4053.940 0.00 0.00 0.00 11900.000 59.617 267.984 6735.118 -322.041 -9278.294 4091.924 0.00 0.00 0.00 12000.000 59.617 267.984 6785.695 -325.076 -9364.507 4129.909 0.00 0.00 0.00 12100.000 59.617 267.984 6836.273 -328.111 -9450.720 4167.893 0.00 0.00 0.00 12159.710 59.617 267.984 6866.473 -329.923 -9502.198 4190.574 0.00 0.00 0.00 Begin Dir Sidetrack point for Horizontal Section of Hole 12200.000 59.617 267.984 6886.851 -331.145 -9536.933 4205.878 0.00 0.00 0.00 12291.244 59.617 267.984 6933.000 -333.914 -9615.597 4240.536 0.00 0.00 0.00 TOP HRZ 12300.000 59.617 267.984 6937.429 -334.180 -9623.146 4243.862 0.00 0.00 0.00 12400.000 59.617 267.984 6988.007 -337.215 -9709.359 4281.846 0.00 0.00 0.00 12500.000 59.617 267.984 7038.584 -340.250 -9795.572 4319.831 0.00 0.00 0.00 12600.000 59.617 267.984 7089.162 -343.284 -9881.785 4357.815 0.00 0.00 0.00 12605.611 59.617 267.984 7092.000 -343.455 -9886.622 4359.947 0.00 0.00 0.00 BASE HRZ 12694.583 59.617 267.984 7137.000 -346.155 -9963.328 4393.742 0.00 0.00 0.00 K-1 MARKER 12700.000 59.617 267.984 7139.740 -346.319 -9967.998 4395.800 0.00 0.00 0.00 12777.623 59.617 267.984 7179.000 -348.675 -10034.919 4425.284 0.00 0.00 0.00 TOP KUPARUK - 12800.000 59.617 267.984 7190.318 -349.354 -10054.211 4433.784 0.00 0.00 0.00 12870.549 59.617 267.984 7226.000 -351.495 -10115.034 4460.582 0.00 0.00 0.00 LCU 12900.000 59.617 267.984 7240.896 -352.389 -10140.424 4471.768 0.00 0.00 0.00 12971.384 59.617 267.984 7277.000 -~54.555 -10201.967 4498.883 0.00 0.00 0.00 5/13/200412:18:17PM Page 5 of 7 COMPASS 2003.5 ORIGINAL . . . ~·II· Conocur.JI. IPS ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Plan: Plan: CD2-31 (wp05) Standard Planning Report 10 May, 2004 spe,-,,-,v-sun DRILLING SERViCeS A HALLIBURTON COMPANY ORIGINAL IlIips Engineering Alpine Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Trav. Cylinder North Error Surface: Elliptical Conic Warning Method: Rules Based ¡Iii Engineering Calculation Method: Error System: Scan Method: Error Surface: Warning Method: Alpine Minimum Curvature ISCWSA Elliptical Conic Rules Based Trav. Cylinder North ê ~ o o o ~ +- '1: 1::: o Z ::;:- '1: '5 o (f) West(-)/East(+) (2000 ftlin) A UAI,UnÆllrr-o:s t::o,\W,\;,\,\' . ConocÓÁ,illips Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) SPERRY_SUN HES Planning Report . sper"r"y-sun DRILLING SERVICES A HALLIBURTON COMPANY Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature Project Map System: Geo Datum: Map Zone: Colville River Unit, North Slope Alaska, United States US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Alaska Zone 04 System Datum: Mean Sea Level Using Well Reference Point Using geodetic scale factor Site Alpine CD2 Site Position: From: Map Position Uncertainty: 0.000 ft Northing: Easting: Slot Radius: 5974641.660usft 371696.240 usft O.OOOin Latitude: Longitude: Grid Convergence: 700 20' 020" N 151002' 028" W -0.98 0 Wen Plan: CD2-31 Well Position +N/-5 +E!-W Position Uncertainty 0.000 ft 0.000 ft 0.000 ft Northing: Easting: Wellhead Elevation: Latitude: Longitude: Ground Level: Well bore PLAN: CD2-31 Magnetics Model Name Sample Date 5974482.770 usfl 371713.040 usfl ft 70020' 018" N 151002' 027" W 0.000 ft bggm2003 Declination (") Dip Angle (0) 8/12/2002 80.59 57424 ------'""-- 24.75 Design Audit Notes: Version: Vertical Section: Plan: CD2-31 (wp05) 12 Phase: PLAN 36.100 Depth From (TVD) (ft) 36.100 Tie On Depth: +E!-W (ft) 0.000 Direction (0) 289.968 +N/-5 (ft) 0.000 -~ Plal1 Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-5 +E!-W Rate Râte Rate (ft) (0) (0) (ft) (ft) (ft) (0/100ft) (0/100ft) (o/~OOft) 36.100 0.000 0.000 36.100 0.000 0.000 0.00 0.00 0.00 0.00 400.001 0.000 0.000 400.001 0.000 0.000 0.00 0.00 0.00 0.00 700.001 9.000 270.000 698.769 0.000 -23.514 3.00 3.00 0.00 270.00 1965.592 59.617 267.985 1710.515 -20.549 -713.544 4.00 4.00 -0.16 -2.25 12159.776 59.617 267.985 6866.438 -329.767 -9502.300 0.00 0.00 0.00 0.00 13857.885 90.439 331.870 7347.000 491.772 -10788.931 4.00 1.82 3.76 75.68 CD2-31 (Heel) 18681.879 90.439 331.870 7310.000 4745.842 -13063.229 0.00 0.00 0.00 0.00 CD2-31 (New Toe) 5/10/2004 10:28:44AM Page 2 of 8 COMPASS 2003.5 ORIG\NAL y ConocoPhillips e SPERRY_SUN HES Planning Report . spe...,...,v-sun DAIL.L.ING seFlVlces /4. HAWBURTON COMPANY Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature Planned Survey M"asured Vertical Vertic~tI [)ogleg Depth Inclination Azimuth Depth +N/..s +E/..W Section Rate (ft) (") (") (ft) (ft) (ft) (ft) ("Ii OOft) 36.100 0.000 0.000 36.100 0.000 0.000 0.000 0.00 0.00 0.00 SHL=1875'FNL&1526'FEL; Sec2-T11 N-R4E 100.000 0.000 0.000 100.000 0.000 0.000 0.000 0.00 0.00 0.00 200.000 0.000 0.000 200.000 0.000 0.000 0.000 0.00 0.00 0.00 300.000 0.000 0.000 300.000 0.000 0.000 0.000 0.00 0.00 0.00 400.001 0.000 0.000 400.001 0.000 0.000 0.000 0.00 0.00 0.00 Begin Dir@ 3.00; 400.010'MD,400.010'TVD .' 500.000 3.000 270.000 499.954 0.000 -2.617 2.460 3.00 3.00 0.00 600.000 6.000 270.000 599.635 0.000 -10.462 9.833 3.00 3.00 0.00 700.001 9.000 270.000 698.769 0.000 -23.514 22.100 3.00 3.00 0.00 Continue Dir @ 4.00: 700.010'MD, 698.778' TVD 800.000 12.998 269.303 796.911 -0.137 -42.588 39.981 4.00 4.00 -0.70 900.000 16.997 268.930 893.485 -0.547 -68.456 64.154 4.00 4.00 -0.37 1000.000 20.996 268.695 988.020 -1.228 -100.993 94.503 4.00 4.00 -0.23 1100.000 24.995 268.533 1080.055 -2.177 -140.040 130.878 4.00 4.00 -0.16 1200.000 28.995 268.413 1169.141 -3.390 -185.406 173.103 4.00 4.00 -0.12 1300.000 32.995 268.320 1254.845 -4.859 -236.871 220.972 4.00 4.00 -0.09 1400.000 36.995 268.246 1336.749 -6.579 -294.184 274.252 4.00 4.00 -0.07 1500.000 40.994 268.183 1414.454 -8.541 -357.065 332.684 4.00 4.00 -0.06 1600.000 44.994 268.131 1487.581 -10.735 -425.208 395.981 4.00 4.00 -0.05 1700.000 48.994 268.085 1555.775 -13.150 -498.282 463.837 4.00 4.00 -0.05 1800.000 52.994 268.044 1618.702 -15.775 -575.930 535.921 4.00 4.00 -0.04 1900.000 56.994 268.007 1676.057 -18.598 -657.773 611.881 4.00 4.00 -0.04 1965.592 59.617 267.985 1710.515 -20.549 -713.544 663.633 4.00 4.00 -0.03 End Dir, Start Sail @59.617; 1965.600' MD, 1710.519' TVD 2000.000 59.617 267.985 1727.917 -21.593 -743.209 691.158 0.00 0.00 0.00 2100.000 59.617 267.985 1778.495 -24.626 -829.422 771.153 0.00 0.00 0.00 2200.000 59.617 267.985 1829.072 -27.659 -915.635 851.148 0.00 0.00 0.00 2300.000 59.617 267.985 1879.649 -30.693 -1001.849 931.143 0.00 0.00 0.00 2400.000 59.617 267.985 1930.226 -33.726 -1088.062 1011.138 0.00 0.00 0.00 2500.000 59.617 267.985 1980.803 -36.759 -1174.276 1091.133 0.00 0.00 0.00 2600.000 59.617 267.985 2031.380 -39.792 -1260.489 1171.128 0.00 0.00 0.00 2700.000 59.617 267.985 2081.957 -42.826 -1346.703 1251.123 0.00 0.00 0.00 2800.000 59.617 267.985 2132.534 -45.859 -1432.916 1331.117 0.00 0.00 0.00 2900.000 59.617 267.985 2183.111 -48.892 -1519.129 1411.112 0.00 0.00 0.00 3000.000 59.617 267.985 2233.689 -51.926 -1605.343 1491.107 0.00 0.00 0.00 3063.886 59.617 267.985 2266.000 -53.863 -1660.421 1542.213 0.00 0.00 0.00 C-40 3100.000 59.617 267.985 2284.266 -54.959 -1691.556 1571.102 0.00 0.00 0.00 3200.000 59.617 267.985 2334.843 -57.992 -1777.770 1651.097 0.00 0.00 0.00 3300.000 59.617 267.985 2385.420 -61.025 -1863.983 1731.092 0.00 0.00 0.00 3309.056 59.617 267.985 2390.000 -61.300 -1871.790 1738.337 0.00 0.00 0.00 9-5/8" Csg Pt...Drill out 8·1/2" Hole: 3314'MD, 2390.000'TVD - 95/8" @ 3309' MD 3400.000 59.617 267.985 2435.997 -64.059 -1950.197 1811.087 0.00 0.00 0.00 3465.253 59.617 267.985 2469.000 -66.038 -2006.454 1863.287 0.00 0.00 0.00 C-30 3500.000 59.617 267.985 2486.574 -67.092 -2036.410 1891.082 0.00 0.00 0.00 3600.000 59.617 267.985 2537.151 -70.125 -2122.623 1971.077 0.00 0.00 0.00 3700.000 59.617 267.985 2587.728 -73.159 -2208.837 2051.072 0.00 0.00 0.00 3800.000 59.617 267.985 2638.305 -76.192 -2295.050 2131.067 0.00 0.00 0.00 3900.000 59.617 267.985 2688.882 -79.225 -2381.264 2211.062 0.00 0.00 0.00 4000.000 59.617 267.985 2739.460 -82.258 -2467.477 2291.057 0.00 0.00 0.00 5/10/200410:28:44AM Page 3 of 8 COMPASS 2003.5 ORIGINAL ~ ConocoPhillips . SPERRY_SUN HES Planning Report . 5pe~~Y-5un DRIL.L.ING seRVices A HALUBURTON COMPANY Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature 4100.000 59.617 267.985 2790.037 -85.292 -2553.691 2371.052 0.00 0.00 0.00 4186.924 59.617 267.985 2834.000 -87.928 -2628.630 2440.587 0.00 0.00 0.00 C-20 4200.000 59.617 267.985 2840.614 -88.325 -2639.904 2451.047 0.00 0.00 0.00 4300.000 59.617 267.985 2891.191 -91.358 -2726.117 2531.042 0.00 0.00 0.00 4400.000 59.617 267.985 2941.768 -94.391 -2812.331 2611.037 0.00 0.00 0.00 4500.000 59.617 267.985 2992.345 -97.425 -2898.544 2691.032 0.00 0.00 0.00 4600.000 59.617 267.985 3042.922 -100.458 -2984.758 2771.027 0.00 0.00 0.00 4700.000 59.617 267.985 3093.499 -103.491 -3070.971 2851.022 0.00 0.00 0.00 4800.000 59.617 267.985 3144.076 -106.525 -3157.185 2931.017 0.00 0.00 0.00 4900.000 59.617 267.985 3194.654 -109.558 -3243.398 3011.012 0.00 0.00 0.00 5000.000 59.617 267.985 3245.231 -112.591 -3329.611 3091.007 0.00 0.00 0.00 5100.000 59.617 267.985 3295.808 -115.624 -3415.825 3171.002 0.00 0.00 0.00 5200.000 59.617 267.985 3346.385 -118.658 -3502.038 3250.997 0.00 0.00 0.00 5300.000 59.617 267.985 3396.962 -121.691 -3588.252 3330.992 0.00 0,00 0.00 5400.000 59.617 267.985 3447.539 -124.724 -3674.465 3410.987 0.00 0.00 0.00 5500.000 59.617 267.985 3498.116 -127.758 -3760.679 3490.982 0.00 0.00 0.00 5600.000 59.617 267.985 3548.693 -130.791 -3846.892 3570.977 0.00 0.00 0.00 5700.000 59.617 267.985 3599.270 -133.824 -3933.105 3650.972 0.00 0.00 0.00 5800.000 59.617 267.985 3649.848 -136.857 -4019.319 3730.967 0.00 0.00 0.00 5900.000 59.617 267.985 3700.425 -139.891 -4105.532 3810.962 0.00 0.00 0.00 . 6000.000 59.617 267.985 3751.002 -142.924 -4191.746 3890.957 0.00 0.00 0.00 6100.000 59.617 267.985 3801.579 -145.957 -4277.959 3970.952 0.00 0.00 0.00 6200.000 59.617 267.985 3852.156 -148.991 -4364.173 4050.947 0.00 0.00 0.00 6286.688 59.617 267.985 3896.000 -151.620 -4438.909 4120.292 0.00 0.00 0.00 K-3 MARKER 6300.000 59.617 267.985 3902.733 -152.024 -4450.386 4130.941 0.00 0.00 0.00 6400.000 59.617 267.985 3953.310 -155.057 -4536.599 4210.936 0.00 0.00 0.00 6500.000 59.617 267.985 4003.887 -158.090 -4622.813 4290.931 0.00 0.00 0.00 6600.000 59.617 267.985 4054.464 -161.124 -4709.026 4370.926 0.00 0.00 0.00 6666.306 59.617 267.985 4088.000 -163.135 -4766.191 4423.968 0.00 0.00 0.00 BASAL K-3 SS 6700.000 59.617 267.985 4105.041 -164.157 -4795.240 4450.921 0.00 0.00 0.00 6721.667 59.617 267.985 4116.000 -164.814 -4813.920 4468.254 0.00 0.00 0.00 K-2 MARKER 6800.000 59.617 267.985 4155.619 -167.190 -4881.453 4530.916 0.00 0.00 0.00 6891.705 59.617 267.985 4202.000 -169.972 -4960.515 4604.275 0.00 0.00 0.00 BASE K-2 SEQUENCE 6900.000 59.617 267.985 4206.196 -170.224 -4967.667 4610.911 0.00 0.00 0.00 " 7000.000 59.617 267.985 4256.773 -173.257 -5053.880 4690.906 0.00 0.00 0.00 7100.000 59.617 267.985 4307.350 -176.290 -5140.093 4770.901 0.00 0.00 0.00 7200.000 59.617 267.985 4357.927 -179.323 -5226.307 4850.896 0.00 0.00 0.00 7300.000 59.617 267.985 4408.504 -182.357 -5312.520 4930.891 0.00 0.00 0.00 7400.000 59.617 267.985 4459.081 -185.390 -5398.734 5010.886 0.00 0.00 0.00 7500.000 59.617 267.985 4509.658 -188.423 -5484.947 5090.881 0.00 0.00 0.00 7600.000 59.617 267.985 4560.235 -191.457 -5571.161 5170.876 0.00 0.00 0.00 7700.000 59.617 267.985 4610.813 -194.490 -5657.374 5250.871 0.00 0.00 0.00 7800.000 59.617 267.985 4661.390 -197.523 -5743.587 5330.866 0.00 0.00 0.00 7900.000 59.617 267.985 4711.967 -200.556 -5829.801 5410.861 0.00 0.00 0.00 - 8000.000 59.617 267.985 4762.544 -203.590 -5916.014 5490.856 0.00 0.00 0.00 8100.000 59.617 267.985 4813.121 -206.623 -6002.228 5570.851 0.00 0.00 0.00 8200.000 59.617 267.985 4863.698 -209.656 -6088.441 5650.846 0.00 0.00 0.00 8300.000 59.617 267.985 4914.275 -212.690 -6174.655 5730.841 0.00 0.00 0.00 8400.000 59.617 267.985 4964.852 -215.723 -6260.868 5810.836 0.00 0.00 0.00 8500.000 59.617 267.985 5015.429 -218.756 -6347.081 5890.831 0.00 0.00 0.00 8600.000 59.617 267.985 5066.007 -221.789 -6433.295 5970.826 0.00 0.00 0.00 8700.000 59.617 267.985 5116.584 -224.823 -6519.508 6050.821 0.00 0.00 0.00 8800.000 59.617 267.985 5167.161 -227.856 -6605.722 6130.816 0.00 0.00 0.00 5/10/200410:28:44AM Page 4 of 8 COMPASS 2003.5 ORIGINAL . . y ConocoPhillips Database: Company: Project: Site: Well: Wel/bore: Design: SPERRY_SUN HES Planning Report spe...,...,v-sun DRIL.L.ING seRVices À HALLIBURTON COMPANY EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature 8900.000 59.617 267.985 5217.738 -230.889 -6691.935 6210.811 0.00 0.00 0.00 9000.000 59.617 267.985 5268.315 -233.922 -6778.149 6290.806 0.00 0.00 0.00 9034.967 59.617 267.985 5286.000 -234.983 -6808.295 6318.777 0.00 0.00 0.00 ALBIAN 97 9100.000 59.617 267.985 5318.892 -236.956 -6864.362 6370.801 0.00 0.00 0.00 9200.000 59.617 267.985 5369.469 -239.989 -6950.575 6450.796 0.00 0.00 0.00 9300.000 59.617 267.985 5420.046 -243.022 -7036.789 6530.791 0.00 0.00 0.00 9400.000 59.617 267.985 5470.623 -246.056 -7123.002 6610.786 0.00 0.00 0.00 9500.000 59.617 267.985 5521.200 -249.089 -7209.216 6690.781 0.00 0.00 0.00 9600.000 59.617 267.985 5571.778 -252.122 -7295.429 6770.776 0.00 0.00 0.00 9700.000 59.617 267.985 5622.355 -255.155 -7381.643 6850.771 0.00 0.00 0.00 9800.000 59.617 267.985 5672.932 -258.189 -7467.856 6930.766 0.00 0.00 0.00 9900.000 59.617 267.985 5723.509 -261.222 -7554.069 7010.760 0.00 0.00 0.00 10000.000 59.617 267.985 5774.086 -264.255 -7640.283 7090.755 0.00 0.00 0.00 10100.000 59.617 267.985 5824.663 -267.289 -7726.496 7170.750 0.00 0.00 0.00 10200.000 59.617 267.985 5875.240 -270.322 -7812.710 7250.745 0.00 0.00 0.00 10300.000 59.617 267.985 5925.817 -273.355 -7898.923 7330.740 0.00 0.00 0.00 10337.928 59.617 267.985 5945.000 -274.506 -7931.622 7361.081 0.00 0.00 0.00 ALBIAN 96 10400.000 59.617 267.985 5976.394 -276.388 -7985.137 7410.735 0.00 0.00 0.00 10500.000 59.617 267.985 6026.972 -279.422 -8071.350 7490.730 0.00 0.00 0.00 10600.000 59.617 267.985 6077.549 -282.455 -8157.563 7570.725 0.00 0.00 0.00 10700.000 59.617 267.985 6128.126 -285.488 -8243.777 7650.720 0.00 0.00 0.00 10800.000 59.617 267.985 6178.703 -288.522 -8329.990 7730.715 0.00 0.00 0.00 10900.000 59.617 267.985 6229.280 -291.555 -8416.204 7810.710 0.00 0.00 0.00 11000.000 59.617 267.985 6279.857 -294.588 -8502.417 7890.705 0.00 0.00 0.00 11100.000 59.617 267.985 6330.434 -297.621 -8588.631 7970.700 0.00 0.00 0.00 11200.000 59.617 267.985 6381.011 -300.655 -8674.844 8050.695 0.00 0.00 0.00 11300.000 59.617 267.985 6431.588 -303.688 -8761.057 8130.690 0.00 0.00 0.00 11400.000 59.617 267.985 6482.166 -306.721 -8847.271 8210.685 0.00 0.00 0.00 11500.000 59.617 267.985 6532.743 -309.755 -8933.484 8290.680 0.00 0.00 0.00 11600.000 59.617 267.985 6583.320 -312.788 -9019.698 8370.675 0.00 0.00 0.00 11700.000 59.617 267.985 6633.897 -315.821 -9105.911 8450.670 0.00 0.00 0.00 11800.000 59.617 267.985 6684.474 -318.854 -9192.125 8530.665 0.00 0.00 0.00 11900.000 59.617 267.985 6735.051 -321.888 -9278.338 8610.660 0.00 0.00 0.00 12000.000 59.617 267.985 6785.628 -324.921 -9364.551 8690.655 0.00 0.00 0.00 12100.000 59.617 267.985 6836.205 -327.954 -9450.765 8770.650 0.00 0.00 0.00 '. 12159.776 59.617 267.985 6866.438 -329.767 -9502.300 8818.468 0.00 0.00 0.00 Begin Dir @ 4.00; 12159.780'MD,6866.440'TVD 12200.000 60.028 269.785 6886.659 -330.443 -9537.064 8850.911 4.00 1.02 4.47 12285.980 60.985 273.580 6929.000 -328.235 -9611.847 8921.953 4.00 1.11 4.41 TOP HRZ 12300.000 61.152 274.192 6935.783 -327.403 -9624.090 8933.744 4.00 1.19 4.36 12400.000 62.416 278.499 6983.079 -317.648 -9711.633 9019.356 4.00 1.26 4.31 12500.000 63.809 282.703 7028.318 -301 .226 -9799.267 9107.329 4.00 1.39 4.20 12600.000 65.322 286.804 7071.280 -278.216 -9886.564 9197.237 4.00 1.51 4.10 12640.543 65.967 288.437 7088.000 -267.034 -9921.764 9234.139 4.00 1.59 4.03 BASE HRZ 12700.000 66.944 290.803 7111.754 -248.730 -9973.099 9288.639 4.00 1.64 3.98 12755.313 67.883 292.972 7133.000 -229.690 -10020.483 9339.676 4.00 1.70 3.92 K·1 MARKER 12800.000 68.663 294.704 7149.543 -212.912 -10058.452 9381.092 4.00 1.75 3.87 12872.042 69.957 297.456 7175.000 -183.281 -10118.973 9448.094 4.00 1.80 3.82 TOP KUPARUK - 12900.000 70.471 298.512 7184.465 -170.937 -10142.204 9474.144 4.00 1.84 3.78 13000.000 72.356 302.234 7216.347 -123.009 -10223.950 9567.342 4.00 1.89 3.72 13018.838 72.719 302.926 7222.000 -113.333 -10239.092 9584.878 4.00 1.93 3.67 LCU 5/10/200410:28:44AM Page 5 of 8 ORIGINAL COMPASS 2003.5 Co~illips . . SPERRY_SUN HES Planning Report Database: Company: Project: Site: Well: Wellbore: Design: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True Minimum Curvature EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine C02 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: SpE!r'r'y-sun DRIL.L.ING seRVices A HALLIBURTON COMPANY 13100.000 74.310 305.878 7245.036 -69.362 -10303.290 9660.233 4.00 13126.175 74.831 306.820 7252.000 -54.407 -10323.612 9684.440 4.00 CD2-31 (Toe) 13200.000 76.323 309.452 7270.391 -10.256 -10379.838 9752.363 4.00 13211.125 76.550 309.845 7273.000 -3.355 -10388.165 9762.546 4.00 MILUVEACH A 13288.744 78.151 312.571 7290.000 46.536 -10445.131 9833.124 4.00 ALPINE D 13300.000 78.386 312.964 7292.289 54.020 -10453.221 9843.284 4.00 13367.157 79.795 315.293 7305.000 99.931 -10500.547 9903.443 4.00 ALPINE C 13400.000 80.491 316.424 7310.623 123.152 -10523.082 9932.553 4.00 13440.414 81.351 317.810 7317.000 152.394 -10550.238 9968.062 4.00 UJU 13500.000 82.629 319.842 7325.303 196.805 -10589.079 10019.735 4.00 13600.000 84.794 323.226 7336.259 274.619 -10650.893 10104.405 4.00 13700.000 86.976 326.587 7343.437 356.215 -10708.221 10186.151 4.00 13737.000 87.786 327.827 7345.128 387.285 -10728.238 10215.575 4.00 7" Csg pt...Continue Dir@4.00: Begin 6-1/8" Hole: 13737.000' MD, 7345' TVD - 7" @ 13737' MD 13800.000 89.168 329.935 7346.802 441.196 -10760.784 10264.574 4.00 13857.885 90.439 331.870 7347.000 491.772 -10788.931 10308.300 4.00 Target Heel: Begin GeoSteer; 13858' MD, 7347' TVD, (1391FNL & 1753FEL, Sec4-T11N-R4E) - CD2-31 (Heel) 13900.000 90.439 331.870 7346.677 528.911 -10808.786 10339.644 0.00 14000.000 90.439 331.870 7345.910 617.097 -10855.932 10414.070 0.00 14100.000 90.439 331.870 7345.143 705.282 -10903.077 10488.496 0.00 14200.000 90.439 331.870 7344.376 793.468 -10950.223 10562.922 0.00 14300.000 90.439 331.870 7343.609 881.654 -10997.368 10637.348 0.00 14400.000 90.439 331.870 7342.842 969.839 -11044.514 10711.773 0.00 14500.000 90.439 331.870 7342.075 1058.025 -11091.659 10786.199 0.00 14600.000 90.439 331.870 7341.308 1146.211 -11138.805 10860.625 0.00 14700.000 90.439 331.870 7340.541 1234.396 -11185.950 10935.051 0.00 14800.000 90.439 331.870 7339.774 1322.582 -11233.096 11009.477 0.00 14900.000 90.439 331.870 7339.007 1410.767 -11280.242 11083.902 0.00 15000.000 90.439 331.870 7338.240 1498.953 -11327.387 11158.328 0.00 15100.000 90.439 331.870 7337.473 1587.139 -11374.533 11232.754 0.00 15200.000 90.439 331.870 7336.706 1675.324 -11421.678 11307.180 0.00 15300.000 90.439 331.870 7335.939 1763.510 -11468.824 11381.606 0.00 15400.000 90.439 331.870 7335.172 1851.696 -11515.969 11456.031 0.00 15500.000 90.439 331.870 7334.405 1939.881 -11563.115 11530.457 0.00 15600.000 90.439 331.870 7333.638 2028.067 -11610.261 11604.883 0.00 15700.000 90.439 331.870 7332.871 2116.253 -11657.406 11679.309 0.00 15800.000 90.439 331.870 7332.104 2204.438 -11704.552 11753.735 0.00 15900.000 90.439 331.870 7331.337 2292.624 -11751.697 11828.160 0.00 16000.000 90.439 331.870 7330.570 2380.810 -11798.843 11902.586 0.00 16100.000 90.439 331.870 7329.803 2468.995 -11845.988 11977.012 0.00 16200.000 90.439 331.870 7329.036 2557.181 -11893.134 12051.438 0.00 16300.000 90.439 331.870 7328.269 2645.367 -11940.279 12125.864 0.00 16400.000 90.439 331.870 7327.502 2733.552 -11987.425 12200.290 0.00 16500.000 90.439 331.870 7326.735 2821.738 -12034.571 12274.715 0.00 16600.000 90.439 331.870 7325.968 2909.923 -12081.716 12349.141 0.00 16700.000 90.439 331.870 7325.201 2998.109 -12128.862 12423.567 0.00 16800.000 90.439 331.870 7324.434 3086.295 -12176.007 12497.993 0.00 16900.000 90.439 331.870 7323.667 3174.480 -12223.153 12572.419 0.00 17000.000 90.439 331.870 7322.900 3262.666 -12270.298 12646.844 0.00 17100.000 90.439 331.870 7322.133 3350.852 -12317.444 12721.270 0.00 17200.000 90.439 331.870 7321.366 3439.037 -12364.589 12795.696 0.00 17300.000 90.439 331.870 7320.599 3527.223 -12411.735 12870.122 0.00 17400.000 90.439 331.870 7319.832 3615.409 -12458.881 12944.548 0.00 5/10/200410:28:44AM Page 6 of 8 ORIGINAL 1.96 3.64 1.99 3.60 2.02 3.56 2.04 3.54 2.06 3.51 2.08 3.49 2.10 3.47 2.12 3.44 2.13 3.43 2.14 3.41 2.16 3.38 2.18 3.36 2.19 3.35 2.19 3.35 2.20 3.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COMPASS 2003.5 conocJ.Phillips . SPERRY_SUN HES Planning Report . spel""'I""'v-sun DRILLING seRVices A HAWBURTON COMPANY Database: Company: Project: Site: Well: Wellbore: Design: EDM 2003.5 Single User Db ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Plan: CD2-31 (wp05) Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well Plan: CD2-31 52 @ 52.000ft (52) 52 @ 52.000ft (52) True / Minimum Curvature 17500.000 90.439 331.870 7319.065 3703.594 -12506.026 13018.973 0.00 0.00 0.00 17600.000 90.439 331.870 7318.298 3791.780 -12553.172 13093.399 0.00 0.00 0.00 17700.000 90.439 331.870 7317.531 3879.966 -12600.317 13167.825 0.00 0.00 0.00 17800.000 90.439 331.870 7316.764 3968.151 -12647.463 13242.251 0.00 0.00 0.00 17900.000 90.439 331.870 7315.997 4056.337 -12694.608 13316.677 0.00 0.00 0.00 18000.000 90.439 331.870 7315.230 4144.522 -12741.754 13391.102 0.00 0.00 0.00 18100.000 90.439 331.870 7314.463 4232.708 -12788.899 13465.528 0.00 0.00 0.00 18200.000 90.439 331.870 7313.696 4320.894 -12836.045 13539.954 0.00 0.00 0.00 18300.000 90.439 331.870 7312.929 4409.079 -12883.191 13614.380 0.00 0.00 0.00 18400.000 90.439 331.870 7312.162 4497.265 -12930.336 13688.806 0.00 0.00 0.00 18500.000 90.439 331.870 7311.395 4585.451 -12977.482 13763.231 0.00 0.00 0.00 18600.000 90.439 331.870 7310.628 4673.636 -13024.627 13837.657 0.00 0.00 0.00 ~·18681.879 90.439 331.870 7310.000 4745.842 -13063.229 13898.596 0.00 0.00 0.00 Target Toe: 18681'MD, 7310'TVD; (2420FNL & 4024FEL, Sec33-T12N_R4E) _ 61/8" Open Hole _ CD2-31 (New Toe) Targets Target Name Shape TVD Northing Eastirìg +N/oS +EI-W (ft) (usft) (usft) ft ft 7310.000 5979451.000 358734.000 4745.842 -13063.229 4/27/2004 5/612004 7347.000 5975159.000 360935.000 491.772 -10788.931 2/23/2004 5/6/2004 7252.000 5977674.000 359645.000 2984.541 -12121.882 2/23/2004 4/29/2004 CD2-31 (New Toe) CD2-31 (Heel) CD2-31 (Toe) Point Rectangle Point Casing Points Measurèd Depth (ft) 3309.065 13737.000 18681.800 Vertical Depth (ft) 2390.005 95/8" @ 3309' MD 7345.128 7" @ 13737' MD 7310.001 61/8" Open Hole Name Casing Diameter (in) 9.625 7.000 6.125 12.250 8.500 6.125 5I10/200410:28:44AM Page 70r8 COMPASS 2003.5 ORIGINAL ANTI-COLLISION SETTINGS Noohing ¡9.~2 5974482.170 """" Ùl.1i1Id" l.o~ Sb 70"20'18.665N 151"02'27513W Interpolation Method:MD Depth Range From: 36.10 Maximum Range: 1978.97 COllOcoPhilipsAlaskaInc Engineering A\>fu< PLAN: CD2-31 Rig: Ref Datum " 52.00ft V.Seçtion Origm Origm ~~ Anglo +NI-S +EJ-W 289.96T 0.00 0.00 36.lO Interval: 50.00 To; 18681.74 Reference: Plan: CD2·31 (wp05) CaJcuhoon Method: Miuiumlll CQrvalllre =t;::~~ ¥';V~~eT Nonh &rer $urnu:e: EUiptk-a1 + Casing WarningMi>thod: Rules Based Colour To MD 300 400 500 750 1000 1250 1500 1750 2000 2500 3000 3500 4000 4500 5000 5500 6500 7500 8500 9500 1??oo 10500 11000 12000 13000 24 48 -72 -96 100 SECTION DETAILS See MD Ine A2i TVD +N/-S +EI-W DLeg TFace VSee Target 36.10 0.000 0.000 36.10 0.00 0.00 0.00 0.000 0.00 400_00 0_000 0.000 400.00 0.00 0.00 0.00 0.000 0.00 700.00 9.000 270_000 Œ8_77 0.00 -23.51 3.00 270.000 22.10 1965-59 59.617 267.984 1710.51 -20.56 -713.54 4.00 -2.250 663.64 12159.71 59.617 267.984 6866.40 -329.89 -9502.24 0.00 0.000 8818.44 13857.93 90.439 331.875 7347.00 491.74 -10788.91 4.00 75_681 10308.33 CD2-3! (Heel) !8681.74 90.439 331.875 7310.00 4745.82 -13062.80 0.00 0.000 13898.18 CD2-31 (New Toe) Travelling Cylinder Azimuth (1:'FO+AZI) [deg] VS Ce¡¡tretÓ Centre $epar<tÜon [ft] CD2-29 (CD2-29) C Colour To .7 0.0 ·15.0 750 1000 1250 1500 !750 2000 2500 3000 3500 4000 4500 5000 5500 6500 7500 8500 9500 10000 10500 11000 12000 13000 5.0 0 27 5.0 ~JO.O -15.0 28-0 _7 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in] . . Halliburton Sperry-Sun Anticollision Report sp.PPY-1&U"1 D..ILLING ....vle.. .\uuu..,.O'I(O'..."..... ce Site: eWell: . Reference Wellpath: Co-ordinate(NE) Reference; Vertical (TVD) Reference: Plan: CD2-31 (wp05) & NOT PLANNED P ISCW SA Ellipse Trav Cyfinder North Ellipse + Casing Company: ConocoPhillips Alaska Inc. Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 Date: 5/10/2004 NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 50.00 ft Depth Range: 36.10 to 18681.74 ft Maximum Radius: 1978.97 ft Reference: Error Model: Scan Method: Error Surface: Casing Points MD TVD Diameter Hole Size NlìIJ1e ft ft in in 3309.06 2390.00 9.625 12.250 95/8" @ 3314' MD 13723.00 7344.55 7.000 8.500 7' @ 13723' MD 18666.75 7310.11 6.125 6.125 61/8" Open Hole Plan: CD2-31 (wp05) Date Composed: 5/312004 Version: 24 Principal: Yes Tied·to: User Defined Sununary <...-."-....----..-.-.. Offset WeUpath -...--.--...-...--....> Reference Offset Ctr-Ctr No.Go Site Well Wellpath MD MD Distance. Area ft ft ft ft Alpine CO2 CD2-07 CD2-07 V2 149.22 150.00 241.04 3.05 237.99 Pass: Major Risk Alpine CD2 CD2-07 CD2-07PB1 V4 149.22 150.00 241.04 2.94 238.10 Pass: Major Risk Alpine CD2 CD2-07 CD2-07PB2 V2 149.22 150.00 241.04 2.94 238.10 Pass: Major Risk Alpine CD2 CD2-08 CD2-D8 V9 Plan: CD2-OB 299.58 300.00 231.17 6.31 224.86 Pass: Major Risk Alpine CD2 CD2-10 CD2-10 V2 551.35 550.00 210.36 9.57 200.79 Pass: Major Risk Alpine CD2 CD2-10 CD2-10PB1 V6 551.35 550.00 210.36 9.46 200.90 Pass: Major Risk Alpine CD2 CD2-12 CD2-12 V7 299.76 300.00 190.23 5.72 184.51 Pass: Major Risk Alpine CO2 CD2-13 CD2-13 V1 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk Alpine CD2 CD2-13 CD2-13PB1 V10 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk Alpine CD2 CD2-13 CD2-13PB2 V4 299.45 300.00 181.85 6.15 175.71 Pass: Major Risk Alpine CD2 CD2·14 CD2-14 V1 549.87 550.00 170.01 9.06 160.96 Pass: Major Risk Alpine CO2 CD2·15 CD2-15 V3 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk Alpine CD2 CD2-15 CD2-15PB1 V1 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk Alpine CD2 CD2-15 CD2-15PB2 V2 752.86 750.00 162.60 13.04 149.56 Pass: Major Risk Alpine CD2 CD2-16 CD2-16 (Sag) VO 499.44 500.00 151.24 8.46 142.78 Pass: Major Risk Alpine CD2 CD2-16 CD2-16 V7 499.40 500.00 151.29 9.01 142.27 Pass: Major Risk Alpine CD2 CD2-17 CD2-17 VO 649.33 650.00 140.15 10.69 129.46 Pass: Major Risk Alpine CD2 CD2-18 CD2-18 (sag) VO 349.68 350.00 131.44 6.28 125.16 Pass: Major Risk Alpine CD2 CD2-18 CD2-18 V7 399.59 400.00 132.45 7.95 124.50 Pass: Major Risk Alpine CO2 CD2-18 CD2-18PB1 (Sag) VO 349.68 350.00 131.44 6.28 125.16 Pass: Major Risk Alpine CO2 CD2-18 CD2-18PB1 V3 399.59 400.00 132.45 7.95 124.50 Pass: Major Risk Alpine CD2 CD2-19 CD2-19 V8 598.16 600.00 115.29 9.81 105.48 Pass: Major Risk Alpine CD2 CD2-2O CD2-2O V4 299.51 300.00 111.57 5.77 105.80 Pass: Major Risk Alpine CD2 CD2-22 CD2-22 V1 698.38 700.00 84.82 10.95 73.87 Pass: Major Risk Alpine CD2 CD2-23 CD2-23 V2 803.30 800.00 88.27 12.78 75.49 Pass: Major Risk Alpine CD2 CD2-23 CD2-23PB1 V12 803.30 800.00 88.27 12.89 75.38 Pass: Major Risk Alpine CO2 CD2-24 CD2-24 VO 749.53 750.00 71.21 12.70 58.51 Pass: Major Risk Alpine CD2 CD2-24 CD2-24PB1 V1 749.53 750.00 71.21 12.70 58.51 Pass: Major Risk Alpine CD2 CD2-25 CD2-25 V1 698.51 700.00 58.06 11.23 46.83 Pass: Major Risk Alpine CD2 CD2-26 CD2-26 V4 250.09 250.00 49.98 4.52 45.46 Pass: Major Risk Alpine CD2 CD2-26 CD2-26PB1 V2 700.32 700.00 37.83 11.22 26.61 Pass: Major Risk Alpine CD2 CD2-26 CD2-26PB2 V3 490.33 490.00 40.54 No Offset Errors Alpine CD2 CD2-27 CD2-27 V6 497.23 500.00 30.60 10.35 20.25 Pass: Major Risk Alpine CD2 CD2-28 CD2-28 V3 399.33 400.00 31.62 7.44 24.18 Pass: Major Risk Alpine CD2 CD2-28 CD2-28PB1 V13 399.33 400.00 31.62 7.55 24.07 Pass: Major Risk Alpine CD2 CD2-29 CD2-29 V1 449.39 450.00 21.51 7.78 13.73 Pass: Major Risk Alpine CD2 CD2-3O CD2-3O V8 249.26 250.00 10.41 4.51 5.90 Pass: Major Risk Alpine CD2 CD2-32 CD2-32 PB1 VO 498.99 500.00 10.96 8.60 2.36 Pass: Major Risk Alpine CD2 CD2-32 CD2-32 VO 498.99 500.00 10.96 8.49 2.47 Pass: Major Risk Alpine CD2 CD2-33 CD2-33 V2 449.88 450.00 21.22 7.48 13.75 Pass: Major Risk Alpine CD2 CD2-33 CD2-33A V1 449.88 450.00 21.22 7.43 13.79 Pass: Major Risk Alpine CD2 CD2-33 CD2-34B V1 449.88 450.00 21.22 7.48 13.75 Pass: Major Risk Alpine CD2 CD2-34 CD2-34 V3 399.69 400.00 25.22 7.62 17.60 Pass: Major Risk Alpine CD2 CD2-34 CD2-34PB1 V2 399.69 400.00 25.22 7.73 17.49 Pass: Major Risk Alpine CD2 CD2-35 CD2-35 V1 413.28 400.00 42.05 7.17 34.88 Pass: Major Risk Alpine CD2 CD2-35 CD2-35A V1 449.16 450.00 42.59 7.61 34.98 Pass: Major Risk ORIGINAL -Halliburton - .p. . y-~ Sperry-SUD D..ILLIND: ....VIC.. Anticollision Report ~ U'U'''1ntrt n-.~" C~mIJ!!)Jy: COI'lOé()Phillips Alaska Inc. Date: 5/10/2004 Time: 10:25:06 Cþ \lillêRiver Unit ncêSite: AlpinaCD2 Co-ordinate(NE) Rererence: nceWelh Plan:CD2-31 Vel:1ical(TVI»ReferenÇe: ~efeJ:"~nÇeWeUI>atb; P!.AN: CD2-31 Summary <-~---.;---.._-----.---- Offset WeUpatb -----_____________> Reference Offset CIr-ClrNo-Go Site Well WeUpatb MÐ MÐ ÐiStaDceArea ft ft ft ft Alpine CD2 CD2-36 CD2-36 Lat 1 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 Lat 2 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 Lat 3 V2 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 Lat 4 V1 Plan: 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 PB1 V5 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-36 CD2-36 V5 299.73 300.00 50.01 5.42 44.60 Pass: Major Risk Alpine CD2 CD2-37 CD2-37 Lat 1 V2 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk Alpine CD2 CD2-37 CD2-37 Lat 2 V1 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk Alpine CO2 CD2-37 CD2-37 Lat 3 V1 Plan: 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk Alpine CD2 CD2-37 CD2-37 V16 349.32 350.00 61.19 6.89 54.30 Pass: Major Risk Alpine CD2 CD2-38 CD2-38 (Sag) VO 399.49 400.00 72.00 6.90 65.10 Pass: Major Risk Alpine CD2 CD2-38 CD2-38 V5 349.49 350.00 71.11 6.24 64.87 Pass: Major Risk Alpine CD2 CD2-39 CD2-39 V1 249.99 250.00 81.01 4.23 76.77 Pass: Major Risk Alpine CD2 CD2-39 CD2-39PB1 VO 249.09 250.00 80.99 4.22 76.77 Pass: Major Risk Alpine CO2 CD2-40 CD2-40 V7 499.04 500.00 90.87 8.23 82.65 Pass: Major Risk Alpine CD2 CD2-40 CD2-40PB1 V9 499.04 500.00 90.87 8.23 82.65 Pass: Major Risk Alpine CD2 CD2-41 CD2-41 V9 547.76 550.00 101.75 9.78 91.97 Pass: Major Risk Alpine CD2 CD2-42 CD2-42 VO 499.24 500.00 111.59 8.28 103.31 Pass: Major Risk Alpine CD2 CD2-42 CD2-42PB1 VO 499.24 500.00 111.59 8.28 103.31 Pass: Major Risk Alpine CD2 CD2-43 CD2-43 (Sag) VO 399.13 400.00 119.37 6.88 112.49 Pass: Major Risk Alpine CD2 CD2-43 C02-43 V8 399.13 400.00 119.37 7.26 112.10 Pass: Major Risk Alpine CD2 CD2-43 CD2-43PB1 (Sag) VO 399.13 400.00 119.37 6.88 112.49 Pass: Major Risk Alpine CD2 CD2-43 CD2-43PB1 V8 399.13 400.00 119.37 7.26 112.10 Pass: Major Risk Alpine CD2 CD2-44 CD2-44 V15 498.30 500.00 130.87 9.15 121.72 Pass: Major Risk Alpine CO2 CD2-45 CD2-45 V5 349.27 350.00 139.24 6.18 133.07 Pass: Major Risk Alpine CD2 CD2-46 CD2-46 V2 448.93 450.00 151.62 7.37 144.24 Pass: Major Risk Alpine CO2 CD2-47 CD2-47 V2 349.36 350.00 161.08 6.12 154.96 Pass: Major Risk Alpine CD2 CD2-48 C02-48 V1 449.10 450.00 170.10 8.23 161.87 Pass: Major Risk Alpine CD2 CD2-49 CD2-49 V1 249.29 250.00 180.84 4.23 176.61 Pass: Major Risk Alpine CD2 CD2-50 CD2-50 V2 449.01 450.00 189.68 8.35 181.33 Pass: Major Risk Alpine CD2 CO2-50 CD2-50PB1 V2 449.01 450.00 189.68 8.35 181.33 Pass: Major Risk Alpine CD2 CO2-51 CD2-51 V8 497.42 500.00 197.61 9.64 187.97 Pass: Major Risk Alpine CO2 CD2-52 CD2-52 V6 249.54 250.00 211.19 5.09 206.10 Pass: Major Risk Alpine CD2 CD2-55 CD2-55 V5 249.58 250.00 241.11 4.84 236.27 Pass: Major Risk Alpine CO2 Plan: CD2-05 Plan: CD2-o5 V5 Plan: 1853.42 1900.00 118.47 29.82 88.65 Pass: Major Risk Alpine CD2 Plan: CD2-09 Plan: CD2-09 VO Plan: 349.99 350.00 220.63 6.62 214.02 Pass: Major Risk Alpine CD2 Plan: CD2-11 Plan: CD2-11 V2 Plan: 399.63 400.00 201.52 7.32 194.20 Pass: Major Risk Alpine CD2 Plan: CD2-21 Plan C02-21 A VO Plan: 349.99 350.00 100.51 6.49 94.01 Pass: Major Risk Alpine CD2 Plan: CD2-21 Plan CD2-21 B VO Plan: 349.99 350.00 100.51 6.49 94.01 Pass: Major Risk Alpine CD2 Plan: CD2-21 Plan: CD2-21 VO Plan: 349.99 350.00 100.51 6.60 93.90 Pass: Major Risk Alpine CD2 Plan: CD2-54 Plan: CD2-54 VO Plan: 299.92 300.00 231.00 5.52 225.48 Pass: Major Risk Alpine CD2 Plan: CD2-56 Plan: CD2-56 VO Plan: 249.99 250.00 250.26 4.66 245.60 Pass: Major Risk Alpine CD2 Prelim: CD2-53 CD2-53 VO Plan: CO2-53 349.99 350.00 220.54 7.20 213.34 Pass: Major Risk Alpine Satellites Alpine West 1 VO Plan: (Prelim) V1 18678.27 13450.00 1432.56 443.37 989.19 Pass: Major Risk Alpine Satellites Alpine West 2 VO Plan: (Prelim) V1 14381.99 11100.00 1459.55 278.16 1181.39 Pass: Major Risk ORIGINAL . . GLOBAL SCAN: Interpolation Method: TVO Depth Range:to 7300.(1) ft Maximum Radius: 2000.00 ft Casing Points SPERRY SUN Anticollision Report Interval: 7357.00 1.00 ft Plan: C02-31 (wp05) & NOT PLANNEO P ISCWSA Ellipse Horizontal Plane Ellipse + Casing 3309.06 2390.00 9.625 13737.00 7345.13 7.000 18681.74 7310.00 6.125 Plan: C02-31 (wp05) Principal: Yes Summary 12.250 8.500 6.125 9 5/8" @ 3309' MD 7" @ 13737' MD Open Hole Alpine C02 Alpine C02 Alpine C02 Alpine CD2 Alpine CD2 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine CD2 Alpine CD2 Alpine C02 Alpine CD2 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 Alpine C02 C02-08 C02-12 C02-13 C02-13 C02-13 C02-14 CD2-15 C02-15 CD2-15 C02-16 C02-16 C02-17 C02-18 C02-18 C02-19 C02-20 C02-22 C02-23 CD2-23 CD2-24 C02-24 CD2-25 C02-26 C02-26 C02-26 C02-28 CD2-28 C02-29 C02-30 CD2-32 C02-32 CD2-33 C02-33 C02-33 C02-34 C02-34 C02-35 C02-35 C02-36 C02-36 C02-37 C02-38 C02-39 C02-39 C02-41 C02-42 Date Composed: Version: Tied-to: 05/03/2004 24 From Well Ref. Point CD2-08 V8 C02-12 V7 C02-13 V1 C02-13PB1 V10 CD2-13PB2 V4 C02-14 V1 CD2-15 V3 CD2-15PB1 V1 CD2-15PB2 V2 CD2-16 (Rig Surveys) V CD2-16 V7 CD2-17 VO CD2~18 V7 CD2-18PB1 V3 C02-19 V8 CD2-20 V4 CD2-22 V1 CD2-23 V2 C02-23PB1 V12 CD2-24 VO CD2-24PB1 V1 CD2-25 V1 CD2-26 V4 CD2-26PB1 V2 CD2-26PB2 V3 C02-28 V3 C02'-28PB1 V13 C02-29 V1 Plan: C02-30 V4 Plan: 12845.70 15094.87 1944.08 187.98 1756.10 CD2-32 PB1 VO CD2-32 VO C02-33 V2 C02-33A V1 C02-34B V1 C02-34 V3 CD2-34PB1 V2 CD2·35 V1 C02-35A V1 CD2-36 PB1 V5 CD2-36 V5 CD2-37 V16 CD2-38 V5 C02-39 V1 C02-39PB1 VO C02-41 V9 C02-42 VO n rR I G·.···'1 I NJA L Vii g _¡~ Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range ConocoPhillips Alaska Inc. (Alpine) Colville River Unit Alpine CD2 Plan: CD2-31 PLAN: CD2-31 (wp05) MD Inc Azim. SSTVD TVD N/S EIW Y X DLS V.S. Comment 36.10 0.00 0.00 -15.90 36.10 0.00 N 0.00 5974482.77 N 371713.04 E 0.00 0.00 SHL=1875'FNL&1526'FEL; Sec2-' 100.00 0.00 0.00 48.00 100.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 CB-GYRO-SS (1) 200.00 0.00 0.00 148.00 200.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 300.00 0.00 0.00 248.00 300.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 400.00 0.00 0.00 348.00 400.00 0.00 N 0.00 E 5974482.77 N 371713.04 E 0.00 0.00 Begin Dir ~400.010'TVD 500.00 3.00 270.00 447.95 499.95 0.00 S 2.62W 5974482.82 N 371710.42 E 3.00 2.46 600.00 6.00 270.00 547.64 599.64 0.00 S 10.46 W 5974482.95 N 371702.58 E 3.00 9.83 . 700.00 9.00 270.00 646.77 698.77 0.00 S 23.51 W 5974483.17 N 371689.53 E 3.00 22.10 Continue D 698.778' TVD 800.00 13.00 269.30 744.91 796.91 0.14 S 42.59 W 5974483.36 N 371670.46 E 4.00 39.98 900.00 17.00 268.93 . 841.49 893.49 0.55S 68.46 W 5974483.39 N 371644.59 E 4.00 64.15 t-«:) 1 000.00 21.00 268.70 936.02 988.02 1.23 S 100.99 W 5974483.27 N 371612.05 E 4.00 94.50 ~w 1100.00 25.00 268.53 1028.06 1080.06 2.18 S 140.04 W 5974482.99 N 371573.00 E 4.00 130.88 """"1"'., 1200.00 29.00 268.41 1117.14 1169.14 3.39 S 185.41 W 5974482.55 N 371527.62 E 4.00 173.10 MWD+IFR-AK-CAZ-SC (2) oÞ~ 1300.00 33.00 268.32 1202.85 1254.85 4.86 S 236.87 W 5974481.96 N 371476.14 E 4.00 220.97 f"~~.:;p 1400.00 37.00 268.25 1284.75 1336.75 6.58 S 294.18 W 5974481.23 N 371418.81 E 4.00 274.25 "j) 1500.00 40.99 268.18 1362.45 1414.45 8.54 S 357.07 W 5974480.34 N 371355.91 E 4.00 332.68 ß ¡ . 1600.00 44.99 268.13 1435.58 1487.58 10.74 S 425.21 W 5974479.31 N 371287.75 E 4.00 395.98 '"'" . 1700.00 48.99 268.09 1503.77 1555.78 13.15 S 498.28 W 5974478.15 N 371214.65 E 4.00 463.84 Z 1800.00 52.99 268.04 1566.70 1618.70 15.78 S 575.93 W 5974476.85 N 371136.97 E 4.00 535.92 1'".~ 1900.00 56.99 268.01 1624.06 1676.06 18.60 S 657.77 W 5974475.43 N 371055.10 E 4.00 611.88 ):> 1965.59 59.62 267.99 1658.52 1710.52 20.55 S 713.54 W 5974474.43 N 370999.31 E 4.00 663.63 End Dir Start Sail I 1710.519' 2000.00 59.62 267.99 1675.92 1727.92 21.59 S 743.21 W 5974473.90 N 370969.63 E 0.00 691.16 r 2100.00 59.62 267.99 1726.49 1778.50 24.63 S 829.42 W 5974472.34 N 370883.39 E 0.00 771.15 2200.00 59.62 267.99 1777.07 1829.07 27.66 S 915.64 W 5974470.78 N 370797.14 E 0.00 851.15 2300.00 59.62 267.99 1827.65 1879.65 30.69 S 1001.85 W 5974469.22 N 370710.90 E 0.00 931.14 2400.00 59.62 267.99 1878.23 1930.23 33.73 S 1088.06 W 5974467.67 N 370624.65 E 0.00 1011.14 2500.00 59.62 267.99 1928.80 1980.80 36.76 S 1174.28 W 5974466.11 N 370538.41 E 0.00 1091.13 2600.00 59.62 267.99 1979.38 2031.38 39.79 S 1260.49 W 5974464.55 N 370452.16 E 0.00 1171.13 2700.00 59.62 267.99 2029.96 2081 .96 42.83 S 1346.70 W 5974462.99 N 370365.91 E 0.00 1251.12 2800.00 59.62 267.99 2080.53 2132.53 45.86 S 1432.92 W 5974461.44 N 370279.67 E 0.00 1331.12 . 2900.00 59.62 267.99 2131.11 2183.11 48.89 S 1519.13 W 5974459.88 N 370193.42 E 0.00 1411.11 3000.00 59.62 267.99 2181.69 2233.69 51.93 S 1605.34 W 5974458.32 N 370107.18 E 0.00 1491.11 3063.89 59.62 267.99 2214.00 2266.00 53.86 S 1660.42 W 5974457.33 N 370052.08 E 0.00 1542.21 C-40 3100.00 59.62 267.99 2232.27 2284.27 54.96 S 1691.56 W 5974456.76 N 370020.93 E 0.00 1571.10 3200.00 59.62 267.99 2282.84 2334.84 57.99 S 1777.77 W 5974455.20 N 369934.69 E 0.00 1651.10 3300.00 59.62 267.99 2333.42 2385.42 61.03 S 1863.98 W 5974453.65 N 369848.44 E 0.00 1731.09 3309.06 59.62 267.99 2338.00 2390.00 61.30 S 1871.79 W 5974453.51 N 369840.63 E 0.00 1738.34 9-5/8'" Csg 2390.000'TVD - 9 5/8' 3400.00 59.62 267.99 2384.00 2436.00 64.06 S 1950.20 W 5974452.09 N 369762.20 E 0.00 1811.09 3465.25 59.62 267.99 2417.00 2469.00 66.04 S 2006.45 W 5974451.07 N 369705.92 E 0.00 1863.29 C-30 3500.00 59.62 267.99 2434.57 2486.57 67.09 S 2036.41 W 5974450.53 N 369675.95 E 0.00 1891.08 3600.00 59.62 267.99 2485.15 2537.15 70.13 S 2122.62 W 5974448.97 N 369589.70 E 0.00 1971.08 3700.00 59.62 267.99 2535.73 2587.73 73.16 S 2208.84 W 5974447.42 N 369503.46 E 0.00 2051.07 3800.00 59.62 267.99 2586.31 2638.31 76.19 S 2295.05 W 5974445.86 N 369417.21 E 0.00 2131.07 3900.00 59.62 267.99 2636.88 2688.88 79.23 S 2381.26 W 5974444.30 N 369330.97 E 0.00 2211.06 4000.00 59.62 267.99 2687.46 2739.46 82.26 S 2467.48 W 5974442.74 N 369244.72 E 0.00 2291.06 4100.00 59.62 267.99 2738.04 2790.04 85.29 S 2553.69 W 5974441.19 N 369158.48 E 0.00 2371.05 4186.92 59.62 267.99 2782.00 2834.00 87.938 2628.63 W 5974439.83 N 369083.51 E 0.00 2440.59 C-20 4200.00 59.62 267.99 2788.61 2840.61 88.33 8 2639.90 W 5974439.63 N 369072.23 E 0.00 2451.05 4300.00 59.62 267.99 2839.19 2891.19 91.368 2726.12 W 5974438.07 N 368985.99 E 0.00 2531.04 4400.00 59.62 267.99 2889.77 2941.77 94.39 8 2812.33 W 5974436.51 N 368899.74 E 0.00 2611.04 4500.00 59.62 267.99 2940.35 2992.35 97.43 8 2898.54 W 5974434.95 N 368813.50 E 0.00 2691.03 4600.00 59.62 267.99 2990.92 3042.92 100.46 8 2984.76 W 5974433.40 N 368727.25 E 0.00 2771.03 4700.00 59.62 267.99 3041.50 3093.50 103.498 3070.97 W 5974431.84 N 368641.00 E 0.00 2851.02 4800.00 59.62 267.99 3092.08 3144.08 106.538 3157.19 W 5974430.28 N 368554.76 E 0.00 2931.02 4900.00 59.62 267.99 3142.65 3194.65 109.568 3243.40 W 5974428.72 N 368468.51 E 0.00 3011.01 5000.00 59.62 267.99 3193.23 3245.23 112.598 3329.61 W 5974427.17 N 368382.27 E 0.00 3091.01 5100.00 59.62 267.99 3243.81 3295.81 115.628 3415.83 W 5974425.61 N 368296.02 E 0.00 3171.00 5200.00 59.62 267.99 3294.39 3346.39 118.668 3502.04 W 5974424.05 N 368209.78 E 0.00 3251.00 5300.00 59.62 267.99 3344.96 3396.96 121.69 8 3588.25 W 5974422.49 N 368123.53 E 0.00 3330.99 5400.00 59.62 267.99 3395.54 3447.54 124.72 8 3674.47 W 5974420.94 N 368037.29 E 0.00 3410.99 5500.00 59.62 267.99 3446.12 3498.12 127.76 8 3760.68 W 5974419.38 N 367951.04 E 0.00 3490.98 . 5600.00 59.62 267.99 3496.69 3548.69 130.79 8 3846.89 W 5974417.82 N 367864.79 E 0.00 3570.98 5700.00 59.62 267.99 3547.27 3599.27 133.828 3933.11 W 5974416.26 N 367778.55 E 0.00 3650.97 5500.00 59.62 267.99 3597.85 3649.85 136.868 4019.32 W 5974414.70 N 367692.30 E 0.00 3730.97 5900.00 59.62 267.99 3648.43 3700.43 139.898 4105.53 W 5974413.15 N 367606.06 E 0.00 3810.96 6000.00 59.62 267.99 3699.00 3751.00 142.928 4191.75 W 5974411.59 N 367519.81 E 0.00 3890.96 6100.00 59.62 267.99 3749.58 3801 .58 145.968 4277.96 W 5974410.03 N 367433.57 E 0.00 3970.95 6200.00 59.62 267.99 3800.16 3852.16 148.998 4364.17 W 5974408.47 N 367347.32 E 0.00 4050.95 ~.~"/L'.:."~~",,,,_. 6286.69 59.62 267.99 3844.00 3896.00 151.628 4438.91 W 5974407.12 N 367272.56 E 0.00 4120.29 K-3 MARKER 6300.00 59.62 267.99 3850.73 3902.73 152.02 8 4450.39 W 5974406.92 N 367261.08 E 0.00 4130.94 6400.00 59.62 267.99 3901.31 3953.31 155.068 4536.60 W 5974405.36 N 367174.83 E 0.00 4210.94 !;,"';~,.. 6500.00 59.62 267.99 3951.89 4003.89 158.09 8 4622.81 W 5974403.80 N 367088.58 E 0.00 4290.93 6600.00 59.62 267.99 4002.46 4054.46 161.128 4709.03 W 5974402.24 N 367002.34 E 0.00 4370.93 6666.31 59.62 267.99 4036.00 4088.00 163.148 4766.19 W 5974401.21 N 366945.15 E 0.00 4423.97 BA8AL K-3 88 ):> 6700.00 59.62 267.99 4053.04 4105.04 164.168 4795.24 W 5974400.69 N 366916.09 E 0.00 4450.92 6721.67 59.62 267.99 4064.00 4116.00 164.81 8 4813.92 W 5974400.35 N 366897.41 E 0.00 4468.25 K-2 MARKER i' 6800.00 59.62 267.99 4103.62 4155.62 167.198 4881.45 W 5974399.13 N 366829.85 E 0.00 4530.92 6891.71 59.62 267.99 4150.00 4202.00 169.97 8 4960.52 W 5974397.70 N 366750.76 E 0.00 4604.28 BA8E K-2 8EQUENCE 6900.00 59.62 267.99 4154.20 4206.20 170.22 8 4967.67 W 5974397.57 N 366743.60 E 0.00 4610.91 7000.00 59.62 267.99 4204.77 4256.77 173.26 8 5053.88 W 5974396.01 N 366657.36 E 0.00 4690.91 7100.00 59.62 267.99 4255.35 4307.35 176.29 8 5140.09 W 5974394.45 N 366571.11 E 0.00 4770.90 7200.00 59.62 267.99 4305.93 4357.93 179.32 8 5226.31 W 5974392.90 N 366484.87 E 0.00 4850.90 7300.00 59.62 267.99 4356.50 4408.50 182.36 8 5312.52 W 5974391.34 N 366398.62 E 0.00 4930.89 7400.00 59.62 267.99 4407.08 4459.08 185.39 8 5398.73 W 5974389.78 N 366312.38 E 0.00 5010.89 . 7500.00 59.62 267.99 4457.66 4509.66 188.42 8 5484.95 W 5974388.22 N 366226.13 E 0.00 5090.88 7600.00 59.62 267.99 4508.24 4560.24 191.46 8 5571.16 W 5974386.67 N 366139.88 E 0.00 5170.88 7700.00 59.62 267.99 4558.81 4610.81 194.498 5657.37 W 5974385.11 N 366053.64 E 0.00 5250.87 7800.00 59.62 267.99 4609.39 4661.39 197.52 8 5743.59 W 5974383.55 N 365967.39 E 0.00 5330.87 7900.00 59.62 267.99 4659.97 4711.97 200.56 8 5829.80 W 5974381.99 N 365881.15 E 0.00 5410.86 8000.00 59.62 267.99 4710.54 4762.54 203.59 8 5916.01 W 5974380.44 N 365794.90 E 0.00 5490.86 8100.00 59.62 267.99 4761.12 4813.12 206.62 8 6002.23 W 5974378.88 N 365708.66 E 0.00 5570.85 8200.00 59.62 267.99 4811.70 4863.70 209.66 8 6088.44 W 5974377.32 N 365622.41 E 0.00 5650.85 8300.00 59.62 267.99 4862.28 4914.28 212.69 8 6174.66 W 5974375.76 N 365536.17 E 0.00 5730.84 8400.00 59.62 267.99 4912.85 4964.85 215.72 8 6260.87 W 5974374.20 N 365449.92 E 0.00 5810.84 8500.00 59.62 267.99 4963.43 5015.43 218.768 6347.08 W 5974372.65 N 365363.67 E 0.00 5890.83 8600.00 59.62 267.99 5014.01 5066.01 221.79 8 6433.30 W 5974371.09 N 365277.43 E 0.00 5970.83 8700.00 59.62 267.99 5064.58 5116.58 224.82 8 6519.51 W 5974369.53 N 365191.18E 0.00 6050.82 8800.00 59.62 267.99 5115.16 5167.16 227.868 6605.72 W 5974367.97 N 365104.94 E 0.00 6130.82 8900.00 59.62 267.99 5165.74 5217.74 230.898 6691.94 W 5974366.42 N 365018.69 E 0.00 6210.81 9000.00 59.62 267.99 5216.32 5268.32 233.92 8 6778.15 W 5974364.86 N 364932.45 E 0.00 6290.81 9034.97 59.62 267.99 5234.00 5286.00 234.98 8 6808.30 W 5974364.31 N 364902.29 E 0.00 6318.78 ALBIAN 97 9100.00 59.62 267.99 5266.89 5318.89 236.96 8 6864.36 W 5974363.30 N 364846.20 E 0.00 6370.80 9200.00 59.62 267.99 5317.47 5369.47 239.99 8 6950.58 W 5974361.74 N 364759.96 E 0.00 6450.80 9300.00 59.62 267.99 5368.05 5420.05 243.02 8 7036.79 W 5974360.19 N 364673.71 E 0.00 6530.79 9400.00 59.62 267.99 5418.62 5470.62 246.06 8 7123.00 W 5974358.63 N 364587.46 E 0.00 6610.79 9500.00 59.62 267.99 5469.20 5521.20 249.09 8 7209.22 W 5974357.07 N 364501.22 E 0.00 6690.78 9600.00 59.62 267.99 5519.78 5571.78 252.128 7295.43 W 5974355.51 N 364414.97 E 0.00 6770.78 9700.00 59.62 267.99 5570.36 5622.36 255.168 7381.64 W 5974353.95 N 364328.73 E 0.00 6850.77 9800.00 59.62 267.99 5620.93 5672.93 258.198 7467.86 W 5974352.40 N 364242.48 E 0.00 6930.77 9900.00 59.62 267.99 5671.51 5723.51 261.22 8 7554.07 W 5974350.84 N 364156.24 E 0.00 7010.76 10000.00 59.62 267.99 5722.09 5774.09 264.268 7640.28 W 5974349.28 N 364069.99 E 0.00 7090.76 10100.00 59.62 267.99 5772.66 5824.66 267.29 8 7726.50 W 5974347.72 N 363983.75 E 0.00 7170.75 10200.00 59.62 267.99 5823.24 5875.24 270.32 8 7812.71 W 5974346.17 N 363897.50 E 0.00 7250.75 10300.00 59.62 267.99 5873.82 5925.82 273.36 8 7898.92 W 5974344.61 N 363811.26 E 0.00 7330.74 10337.93 59.62 267.99 5893.00 5945.00 274.51 8 7931.62 W 5974344.02 N 363778.54 E 0.00 7361.08 ALBIAN 96 . 10400.00 59.62 267.99 5924.39 5976.39 276.39 8 7985.14 W 5974343.05 N 363725.01 E 0.00 7410.74 10500.00 59.62 267.99 5974.97 6026.97 279.42 8 8071.35 W 5974341.49 N 363638.76 E 0.00 7490.73 '10600.00 59.62 261.99-- 6025.55 6077.55 282.46 $ 8157.56 W .. 5974339.94 N 363552:52 E 0.00 7570.73 (0 10700.00 59.62 267.99 6076.13 6128.13 285.49 8 8243.78 W 5974338.38 N 363466.27 E 0.00 7650.72 10800.00 59.62 267.99 6126.70 6178.70 288.52 8 8329.99 W 5974336.82 N 363380.03 E 0.00 7730.72 ;0 10900.00 59.62 267.99 6177.28 6229.28 291.56 8 8416.20 W 5974335.26 N 363293.78 E 0.00 7810.71 11000.00 59.62 267.99 6227.86 6279.86 294.59 8 8502.42 W 5974333.70 N 363207.54 E 0.00 7890.71 ~ 11100.00 59.62 267.99 6278.43 6330.43 297.628 8588.63 W 5974332.15 N 363121.29 E 0.00 7970.70 ø 11200.00 59.62 267.99 6329.01 6381.01 300.66 8 8674.84 W 5974330.59 N 363035.05 E 0.00 8050.70 11300.00 59.62 267.99 6379.59 6431.59 303.69 8 8761.06 W 5974329.03 N 362948.80 E 0.00 8130.69 t!"~ 11400.00 59.62 267.99 6430.17 6482.17 306.72 8 8847.27 W 5974327.47 N 362862.55 E 0.00 8210.69 Z 11500.00 59.62 267.99 6480.74 6532.74 309.76 8 8933.48 W 5974325.92 N 362776.31 E 0.00 8290.68 11600.00 59.62 267.99 6531 .32 6583.32 312.798 9019.70 W 5974324.36 N 362690.06 E 0.00 8370.68 » 11700.00 59.62 267.99 6581 .90 6633.90 315.828 9105.91 W 5974322.80 N 362603.82 E 0.00 8450.67 11800.00 59.62 267.99 6632.47 6684.47 318.858 9192.13 W 5974321.24 N 362517.57 E 0.00 8530.67 r- 11900.00 59.62 267.99 6683.05 6735.05 321.898 9278.34 W 5974319.69 N 362431.33 E 0.00 8610.66 12000.00 59.62 267.99 6733.63 6785.63 324.92 8 9364.55 W 5974318.13 N 362345.08 E 0.00 8690.66 12100.00 59.62 267.99 6784.21 6836.21 327.95 8 9450.77 W 5974316.57 N 362258.84 E 0.00 8770.65 12159.78 59.62 267.99 6814.44 6866.44 329.77 8 9502.30 W 5974315.64 N 362207.28 E 0.00 8818.47 Begin Dir ~6866.440'TVD 12200.00 60.03 269.79 6834.66 6886.66 330.44 8 9537.06 W 5974315.56 N 362172.51 E 4.00 8850.91 12285.98 60.99 273.58 6877.00 6929.00 328.24 8 9611.85 W 5974319.05 N 362097.79 E 4.00 8921.95 TOP HRZ 12300.00 61.15 274.19 6883.78 6935.78 327.40 8 9624.09 W 5974320.09 N 362085.56 E 4.00 8933.74 12400.00 62.42 278.50 6931.08 6983.08 317.658 9711.63 W 5974331.34 N 361998.20 E 4.00 9019.36 . 12500.00 63.81 282.70 6976.32 7028.32 301.23 8 9799.27 W 5974349.25 N 361910.87 E 4.00 9107.33 12600.00 65.32 286.80 7019.28 7071.28 278.22 8 9886.56 W 5974373.75 N 361823.99 E 4.00 9197.24 12640.54 65.97 288.44 7036.00 7088.00 267.03 8 9921.76 W 5974385.53 N 361788.99 E 4.00 9234.14 BA8E HRZ 12700.00 66.94 290.80 7059.75 7111.75 248.73 8 9973.10 W 5974404.71 N 361737.98 E 4.00 9288.64 12755.31 67.88 292.97 7081.00 7133.00 229.69 8 10020.48 W 5974424.56 N 361690.93 E 4.00 9339.68 K-1 MARKER 12800.00 68.66 294.70 7097.54 7149.54 212.91 8 10058.45 W 5974441.98 N 361653.26 E 4.00 9381.09 12872.04 69.96 297.46 7123.00 7175.00 183.288 10118.97 W 5974472.64 N 361593.26 E 4.00 9448.09 TOP KUPARUK 12900.00 70.47 298.51 7132.46 7184.47 170.94 8 10142.20 W 5974485.38 N 361570.24 E 4.00 9474.14 13000.00 72.36 302.23 7164.35 7216.35 123.01 8 10223.95 W 5974534.70 N 361489.33 E 4.00 9567.34 13018.84 72.72 302.93 7170.00 7222.00 113.338 10239.09 W 5974544.63 N 361474.36 E 4.00 9584.88 LCU 13100.00 74.31 305.88 7193.04 7245.04 69.36 8 10303.29 W 5974589.69 N 361410.93 E 4.00 9660.23 13126.18 74.83 306.82 7200.00 7252.00 54.418 10323.61 W 5974604.99 N 361390.87 E 4.00 9684.44 CD2-31 (Toe) 13200.00 76.32 309.45 7218.39 7270.39 10.268 10379.84 W 5974650.09 N 361335.41 E 4.00 9752.36 13211.13 76.55 309.85 7221.00 7273.00 3.368 10388.17 W 5974657.13 N 361327.20 E 4.00 9762.55 MILUVEACH A 13288.74 78.15 312.57 7238.00 7290.00 46.54 N 10445.13 W 5974707.99 N 361271.11 E 4.00 9833.12 ALPINE 0 13300.00 78.39 312.96 7240.29 7292.29 54.02 N 10453.22 W 5974715.61 N 361263.14 E 4.00 9843.28 13367.16 79.80 315.29 7253.00 7305.00 99.93 N 10500.55 W 5974762.32 N 361216.61 E 4.00 9903.44 ALPINE C 13400.00 80.49 316.42 7258.62 7310.62 123.15 N 10523.08 W 5974785.92 N 361194.48 E 4.00 9932.55 13440.41 81.35 317.81 7265.00 7317.00 152.39 N 10550.24 W 5974815.62 N 361167.83 E 4.00 9968.06 UJU 13500.00 82.63 319.84 7273.30 7325.30 196.81 N 10589.08 W 5974860.68 N 361129.76 E 4.00 10019.74 13600.00 84.79 323.23 7284.26 7336.26 274.62 N 10650.89 W 5974939.54 N 361069.29 E 4.00 10104.41 13700.00 86.98 326.59 7291.44 7343.44 356.22 N 10708.22 W 5975022.09 N 361013.37 E 4.00 10186.15 13737.00 87.79 327.83 7293.13 7345.13 387.29 N 10728.24 W 5975053.50 N 360993.89 E 4.00 10215.587" Csg Pt... 7345' TVD - 7" @ 137 13800.00 89.17 329.94 7294.80 7346.80 441.20 N 10760.78 W 5975107.95 N 360962.28 E 4.00 10264.57 13857.89 90.44 331.87 7295.00 7347.00 491.77 N 10788.93 W 5975159.00 N 360935.00 E 4.00 10308.30 Target Hee 7347' TVD (1391 FNL 13900.00 90.44 331.87 7294.68 7346.68 528.91 N 10808.79 W 5975196.47 N 360915.79 E 0.00 10339.64 14000.00 90.44 331.87 7293.91 7345.91 617.10 N 10855.93 W 5975285.44 N 360870.16 E 0.00 10414.07 14100.00 90.44 331.87 7293.14 7345.14 705.28 N 10903.08 W 5975374.41 N 360824.53 E 0.00 10488.50 14200.00 90.44 331.87 7292.38 7344.38 793.47 N 10950.22 W 5975463.39 N 360778.91 E 0.00 10562.92 14300.00 90.44 331.87 7291.61 7343.61 881.65 N 10997.37 W 5975552.36 N 360733.28 E 0.00 10637.35 14400.00 90.44 331.87 7290.84 7342.84 969.84 N 11044.51 W 5975641 .33 N 360687.65 E 0.00 10711.77 . 14500.00 90.44 331.87 7290.08 7342.08 1058.03 N 11091.66 W 5975730.30 N 360642.03 E 0.00 10786.20 14600.00 90.44 331.87 7289.31 7341.31 1146.21 N 11138.81 W 5975819.27 N 360596.40 E 0.00 10860.63 14700.00 90.44 331.87 7288.54 7340.54 1234.40 N 11185.95 W 5975908.25 N 360550.78 E 0.00 10935.05 C.:> 14800.00 90.44 331.87 7287.77 7339.77 1322.58 N 11233.10 W 5975997.22 N 360505.15 E 0.00 11009.48 14900.00 90.44 331.87 7287.01 7339.01 1410.77 N 11280.24 W 5976086.19 N 360459.52 E 0.00 11083.90 :;0 15000.00 90.44 331.87 7286.24 7338.24 1498.95 N 11327.39 W 5976175.16 N 360413.90 E 0.00 11158.33 15100.00 90.44 331.87 7285.47 7337.47 1587.14 N 11374.53 W 5976264.13 N 360368.27 E 0.00 11232.75 15200.00 90.44 331.87 7284.71 7336.71 1675.32 N 11421.68 W 5976353.11 N 360322.65 E 0.00 11307.18 ~~;) 15300.00 90.44 331.87 7283.94 7335.94 1763.51 N 11468.82 W 5976442.08 N 360277.02 E 0.00 11381.61 ~' ",j¡ . 15400.00 90.44 331.87 7283.17 7335.17 1851.70 N 11515.97W 5976531.05 N 360231.39 E 0.00 11456.03 15500.00 90.44 331.87 7282.41 7334.41 1939.88 N 11563.12 W 5976620.02 N 360185.77 E 0.00 11530.46 '~;.? 15600.00 90.44 331.87 7281.64 7333.64 2028.07 N 11610.26 W 5976708.99 N 360140.14 E 0.00 11604.88 <~.- ::1> 15700.00 90.44 331.87 7280.87 7332.87 2116.25 N 11657.41 W 5976797.97 N 360094.52 E 0.00 11679.31 15800.00 90.44 331.87 7280.10 7332.10 2204.44 N 11704.55 W 5976886.94 N 360048.89 E 0.00 11753.74 ~~ 15900.00 90.44 331.87 7279.34 7331.34 2292.62 N 11751.70 W 5976975.91 N 360003.26 E 0.00 11828.16 g 16000.00 90.44 331.87 7278.57 7330.57 2380.81 N 11798.84 W 5977064.88 N 359957.64 E 0.00 11902.59 16100.00 90.44 331.87 7277.80 7329.80 2469.00 N 11845.99 W 5977153.85 N 359912.01 E 0.00 11977.01 16200.00 90.44 331.87 7277.04 7329.04 2557.18 N 11893.13 W 5977242.83 N 359866.38 E 0.00 12051.44 16300.00 90.44 331.87 7276.27 7328.27 2645.37 N 11940.28 W 5977331.80 N 359820.76 E 0.00 12125.86 16400.00 90.44 331.87 7275.50 7327.50 2733.55 N 11987.43 W 5977420.77 N 359775.13 E 0.00 12200.29 16500.00 90.44 331.87 7274.74 7326.74 2821.74 N 12034.57 W 5977509.74 N 359729.51 E 0.00 12274.72 16600.00 90.44 331.87 7273.97 7325.97 2909.92 N 12081.72 W 5977598.71 N 359683.88 E 0.00 12349.14 16700.00 90.44 331.87 7273.20 7325.20 2998.11 N 12128.86 W 5977687.68 N 359638.25 E 0.00 12423.57 . 16800.00 90.44 331.87 7272.43 7324.43 3086.30 N 12176.01 W 5977776.66 N 359592.63 E 0.00 12497.99 16900.00 90.44 331.87 7271.67 7323.67 3174.48 N 12223.15 W 5977865.63 N 359547.00 E 0.00 12572.42 17000.00 90.44 331.87 7270.90 7322.90 3262.67 N 12270.30 W 5977954.60 N 359501.38 E 0.00 12646.84 17100.00 90.44 331.87 7270.13 7322.13 3350.85 N 12317.44 W 5978043.57 N 359455.75 E 0.00 12721 .27 17200.00 90.44 331.87 7269.37 7321.37 3439.04 N 12364.59 W 5978132.54 N 359410.12 E 0.00 12795.70 17300.00 90.44 331.87 7268.60 7320.60 3527.22 N 12411.74 W 5978221.52 N 359364.50 E 0.00 12870.12 17400.00 90.44 331.87 7267.83 7319.83 3615.41 N 12458.88 W 5978310.49 N 359318.87 E 0.00 12944.55 17500.00 90.44 331.87 7267.07 7319.07 3703.59 N 12506.03 W 5978399.46 N 359273.25 E 0.00 13018.97 17600.00 90.44 331.87 7266.30 7318.30 3791.78 N 12553.17 W 5978488.43 N 359227.62 E 0.00 13093.40 17700.00 90.44 331.87 7265.53 7317.53 3879.97 N 12600.32 W 5978577.40 N 359181.99 E 0.00 13167.83 17800.00 90.44 331.87 7264.76 7316.76 3968.15 N 12647.46 W 5978666.38 N 359136.37 E 0.00 13242.25 17900.00 90.44 331.87 7264.00 7316.00 4056.34 N 12694.61 W 5978755.35 N 359090.74 E 0.00 13316.68 18000.00 90.44 331.87 7263.23 7315.23 4144.52 N 12741.75 W 5978844.32 N 359045.12 E 0.00 13391.10 18100.00 90.44 331.87 7262.46 7314.46 4232.71 N 12788.90 W 5978933.29 N 358999.49 E 0.00 13465.53 18200.00 90.44 331.87 7261.70 7313.70 4320.89 N 12836.05 W 5979022.26 N 358953.86 E 0.00 13539.95 18300.00 90.44 331.87 7260.93 7312.93 4409.08 N 12883.19 W 5979111.24 N 358908.24 E 0.00 13614.38 -- ". '~ 4~J ','''T.".'iÐ.~) l'~~~~) \\_ ß f,~"·.'t:"'.;Qft<mJ>. 0.,'7' ~- ):> r 18400.00 18500.00 18600.00 18681.88 90.44 90.44 90.44 90.44 331.87 331.87 331.87 331.87 7260.16 7259.40 7258.63 7258.00 7312.16 7311.40 7310.63 7310.00 4497.27 N 4585.45 N 4673.64 N 4745.84 N 12930.34 W 12977.48 W 13024.63 W 13063.23 W 5979200.21 N 5979289.18 N 5979378.15 N 5979451.00 N 358862.61 E 358816.98 E 358771.36 E 358734.00 E 0.00 13688.81 0.00 13763.23 0.00 13837.66 0.00 13898.60 TargetToe 7310'TVD: Sec33-T1: . . ConocoPhillips Alaska, Inc.. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 · V ConocoPhillips May 13, 2004 Alaska Oil and Gas Conservation Commission 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CD2-31 RECEIVED MAY 1 4 2004 Alaska Oil & Gas Gons Com . . . miSSIOn Anchorage Dear Sir or Madam: Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the Alpine CD2 drilling pad. The intended spud date for this well is June 5, 2004. It is intended that Doyon Rig 19 drill the well. The pilot hole well, CD2-31 PB1 will be drilled through the Alpine C sand at +/-60° inclination for logging and evaluation purposes. The well will be plugged back above the HRZ with cement. The well CD2-31 will then be drilled off the cement plug and landed in the Alpine sand horizontally. 7" casing will then be run and cemented in place. The horizontal section will be drilled with oil based mud using mineral oil as the base fluid. CD2-31 will be completed as producer with a perforated liner. At the end of the work program the well will be shut in awaiting surface connection. Note that it is planned to drill the surface hole without a diverter. There have been 41 wells drilled on CD1 pad and 45 wells drilled on CD2 pad with no significant indication of gas or shallow gas hydrates. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program 4. A drilling fluids program summary. 5. Proposed pilot hole plug back diagram. 6. Proposed completion diagram. 7. Pressure information as required by 20 ACC 25.035 (d)(2). 8. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setup which replaces diverter ORIGINAL \. . If you have any questions or require further information, please contact Vern Johnson at 265-6081 or Chip Alvord at 265-6120. ~~I? ) ¡; 7 ky ~ohnson Drilling Engineer Attachments cc: CD2-31 Well File / Sharon Allsup Drake Chip Alvord Vern Johnson Cliff Crabtree Steve Moothart/Jeff Yeaton Nancy Lambert Lanston Chin e-mail: ATO 1530 ATO 1700 ATO 1702 ATO 1768 A TO 1756/1752 Anadarko - Houston Kuukpik Corporation Tommy_Thompson @anadarko.com RECEIVED MAY 14 2004 C mmissíon ì! & Gas Cons. 0 Alaska 0" Anchorage . SHARON K. ALLSUP-DRAKE 1054 CONOCOPHILLlPS ~~~~ET ""'~"'-, æJ04- 62-"~,, ANOH""GE AK 9950, ~ ;~~i~J:!' Ç1í11 E tJr U'/s 1':1'1 IÎQ:7c- $ /à;J 00 ~~cL(¡.£,/,,-- ~'~"A.S 6J ,a.. CHASE Chose ManltO"on Bank USA, N.A. Valid Up To 5000 DOllars ' 200 White C¡ay Center Dr., Newark, D£19711 ... - , - ~~~ 40/· -- ~L .""'- -- ---.---- --- ----. ------- ----- -_n_ _ ': 0 3 · · DOH ~ ': i' . B ~ ? . '10 ? 'I i' ?¡; 1/' .0 5 ~ . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME CRt{, (!])z -3/ ~ 3/f)!- PTD# 2Dc/-ó82- / Development Service CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API num ber last two (2) digits are between 60-69) Exploration Stratigraphic "CLUE" The permit is for a new weJJbore segment of existing well , Permit No, API No. . Production. should continue to be reported as a function 'of the original API number. stated above. / HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot bole must be clearly differentiated In both name (name on permit plus PH) B::). ¿D2.'?JI{?lIand API number (50'IOÓ"'2D4r/3-7ö 70/80) from records, data and logs acquired for we)) (name on permit). PILOT (PH) SPACING EXCEPTION "". DRY DITCH SAMPLE The permit is approved subject ·to fun compliance with 20 AAC 25.0SS~ Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing e:xception. (Company Name) assumes the liability of any protest to tbe spacing . exception that may occur. AlJ dry ditcb sample sets submitted to the Commission must be in no greater than 30' sample inten'als from below tbe permafrost or from where samples are first caught and 10' sample intervals througb target zones. Field & Pool COLVILLE RIVER, ALPINE OIL -120100 Well Name: COLVILLE RIV UNIT CD2-31 Program DEV __ Well bore seg PTD#: 2040820 Company CONOCOPHILLlPS ALASKA INC nitial Classrrype DEVIPEND GeoArea 890 Unit 50360 __ On/Off Shore ~_ Annular Disposal D Administration 1 Pe UTj it fee attache~_ - - - - Yes_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 _Lease number _approwiate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No _ _ Surtace LOcÇItion jn_ ADL 380015; wellpaS5- t/1(ough ADL_ 3872Q7; top Of pJQd ilJterval_and TD lie within_an 3 _U_nique welln_ame_and lJumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ Yes__ _ _ _ ASRG leª5-e_(#~I:R1) th<lt is located withjnJbe CQhÔlleRi",er Uoit ",n!:UheAlpineJ:'A. _ _ - - - . . . . . . - - - - - - - ,4 WelUQcated inadefine_d_pOQI _ _ _ _ _ _ _ - - - - - - Yes_ _ _ _ Alpine OiJ PooLC_onseJ'v'atiQn_ QrderNo, 443 _ - - - - - - - 5 WeJUQcated proper _distance from driJling unit boundary_ - - - - Yes _ _ CO .443: ~(ÏII unit .si~e IJQt .specified. butweJls mU5-t Þe > 50Q' from eachoth_er 8. _exleriQrboundªry pf - 6 WeJUocated prpperdistance_ from Qtber wells_ _ - - - - _ _Yes_ _ affected ªreª UstedJn CO 4<13_A.s prop05-ed,_ tbe welln:1E~ets_ tbeseconditioos_. Neares_t offset welL 7 Sutficientacreag.e_aYail<lble indJiUiog unjt _ _ _ _ - - - - - - Yes _ _ is 2.000' NE. Pro_d. inte(\/¡¡L& TD are >sQO' frQm the eJrteriou( bO!Jodary of COA43's ¡¡ffected <lrea. 8 Jfdeviated, js weJlbore pl¡¡tincJuded _ _ _ - - - - - - Y_es _ _ They <I(eaJsp >500' from thee~erior bQundary ofJbe CRU ,uld_ tbe Alpine PA._ 9 _Ope(ator only affected p",rty _ _Yes _ _ - - - - - - - - - - - - - - - - - - - - - - - - 10 _Ope(ator b",s_apprppriateJ:!ond inJorce _ . _ _ _ . . _ _ . _ . . . _ .__.____Yes._ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + - - - 11 Permit can be issued witbQut conservation order_ _ _ _ _ _ Yes __ - - - - - - - - - - - - - - - - - - - - - - - Appr Date 12 Permit can Þe issued witbout administrati",eapprpvaJ _ Yes - - - - - - - - - - - - - - - - - - - - - - - - - - SFD 5/18/2004 13 Can permit be approved before 15-day wait Yes . 14 WeJIJQc¡¡ted within area and str¡¡ta authorized by_lnjectiolJ Ord_er # (putlO# in_commelJtsUfor NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 .AJI welJs_withinJl4.mile_are_a_of reyiew id_eot[fied (Fp( 5-ervjce.weU only). . _ _ . . . . . . . .NA _. - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - 116 Pre-produ_ced injector; 9ur<ltionof pre-production less than_:3 montbs (for_se(\/ice well QnJy) NA - - - - - - - - - - - - - - - - - - - - - - - - - I 17 ACMP F:indjngof Consistency_ has bee_n J5-sued for_ tbis project NA · . WelJ driJled from exisJiog pad - Engineering 18 _Cooductor stringpJovided _ - - - - - - Yes_ _ - - - - - - - - - - - - - - - - - - - 19 Su(Íace_c¡¡5-ingpJotecJ5- all known USDWs . NA · .1\10 ¡¡quiferS,pe( AIO 18,11. çonclusion 3._ - - - - - - 20 CMT vol adeQuate_ to circulate o_n _conductor & $urf c.sg _ Yes __ - - - - - - - - 21 CMT v_ol adeQuate_ to tie-inJong _string tos!J(Í csg_ No · _ Annular disp9sal m_ay be prpposed. . - - - - -- 22 CMTwill coyer_aJl known-Pfo_ductive bQri~Qns . No_ · . Open_h_ole completion planne_d._ - - - - - 123 Casing de_signs adequa_te fpr C,T, B_&_ permafrost. _ Yes_ - - - - - - - - - - - - 24 A~equatetan_k¡¡geor reserve pit. - - - - - - - Yes_ . · . Rig iSßquippedwith $teelpjts. No reser\le_pjtplanlJed, Waste to ¡¡n approved anMIU$.. 25 JtaJe-drilt has_a_ to-403 for abandonment beeo ¡¡PPJQved _ NA - - - - - - - - - - - - - - - - - - - - - - - - - - 26 _Mequ<ltewe!ll:¡ore separ¡¡tjo.n_proP95-ed _ _ . _ . . . . . . _ _ . _ . _ _ _ . Yes. . _ . _ !?rpximity an<llysi$ perfwme.d, Jrayeling cylinder patb calc;uJate_d, GyrO$ pos.si.ble. _ _ _ . _ . . . . _ _ - . . - _ _ - - 27 Jfdivecter required, doe$ it meet reguJations_ _ . - - - - NA _ _ _ Diverter wai",er has !:¡eeo given o_n _c.D-2 pa_d, _ - - - - - - - - - - - - - - - - - - - Appr Date 28 _DriUilJg fluid prog.ram schem¡¡tic_& e(tuip Jistadequate_ - - - - - - - - Yes __ _ _ . Maximum expected fo(maJion pre5-sure8J_ EMW. MW planned 9.6 - 9.8ppg in 8-1/2" hole. 8.1 - 8.8 ppg in sand. TEM 5/1812004 129 BOPEs,_ d_o they meet reguJation . - - - - -- - - - - - - Yes. . - - - - - - - - - - - - - - - -- - ~ 1l~ '¡3D _BOPEpress raJilJg appropriate; test to_(put psig in_comments) Yes. _ · . MAS!? calcuJated_at 2561 psi. 3SQOp~iappr9prjate. CPN usually te_ststQ SQOO psi._ _ - - - - - - - - - 31 Choke manifold cQmpJie5- w/API RI:-s3. (May 84)_ . - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 32 Work will PcCU( withoytoperatjon _shutdown_ _ _ _ _ - - - - - - - Yes __ - - - - - - - - - - - - - - - - - - - 33 J5- pres.ence Qf H2S gas probable _ _ - - - - - - - - - - No_ __ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 34 MeçbanicaLC9ndíUon p{ we.lls within AOR verified (For s_e(\/jce welJ onJy) NA - - - - - - - - - - - - - - - - - - Geology i35 Permit c.ao be issued w/o hyd(ogen_ sulfide meas_ures Yes __ - - - - - - - - - - - - - - - - - - 136 _D_ata_preselJted Qn pote_ntial oveJPres_sure _zones_ Yes · . Expected reservoir pre_ssure i.s8,7ppg EMW; will be _drilled witb 8.8 ppg myd. . Appr Date 37 Seismic_analysis Qf sbaJlow gas_zolJes . NA - - - - - - - - - - - SFD 5/17/2004 138 Se¡¡l:¡ed _condjtjpo survey -(if off-shpre) NA - - - - - - - - - - - 39 _ Contact namelphoneJor_weekly progre$sreports [1 NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geologic Date: Engineering Date Proposal includes a pilot hole that will be drilled, plugged back, and then the well will be sidetracked as a horizontal Commissioner: Commissioner: DTS Jf J ctY /1- production well. e e Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, infonnation of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . . 2o'f - 03 ¿ )2&8'S- Sperry-Sun Drilling Services LIS Scan Utility RECEIVED $Revision: 3 $ LisLib $Revision: 4 $ Tue Sep 14 09:21:01 2004 {"'·r'"' ~~ í) A"~4 ,')~-...~_J/ r' jlll! '-,-, ..... U Llv A'ð.ska Oil &: Gas Cons. Commission Anchorage Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/14 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name.... . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/14 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Coville River Unit (Alpine) MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA CD2-31 PB1 501032049370 ConocoPhillips Alaska, Inc. Sperry Sun 23-AUG-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 MW0003109992 R. KRELL D. BURLEY # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 2 llN 4E 1875 1526 .00 52.84 15.90 # WELL CASING RECORD 1ST STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3302.0 . . 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) REFERENCED TO BIT, UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD). 3. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 4. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR), ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN) WITH INTEGRAL ACOUSTIC CALIPER (ACAL), AND AZIMUTHAL STABILIZED LITHO- DENSITY (ASLD). 5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE LOGGING REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26 SEPTEMBER 2001. 6. MWD RUN 2 REPRESENTS WELL CD2-31 PB1 WITH API# 50-103-20493-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13245'MD, 7429'TVD. CALA ADBQ ADTQ ADLQ ADRQ SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING SGRC SMOOTHED GAMMA RAY COMBINED SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) SFXE = SMOOTHED FORMATION EXPOSURE TIME (RESISTIVITY) TNPS = SMOOTHED COMPENSATED THERMAL NEUTRON POROSITY - SANDSTONE LITHOLOGY CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE (NEUTRON) CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE (NEUTRON) SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW COUNT-RATE BIN) SC02 = SMOOTHED STANDOFF CORRECTION (LOW COUNT-RATE BIN) SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW COUNT-RATE BIN) SMOOTHED ACOUSTIC CALIPER AZIMUTHAL DENSITY - BOTTOM QUADRANT DATA AZIMUTHAL DENSITY - TOP QUADRANT DATA AZIMUTHAL DENSITY - LEFT QUADRANT DATA AZIMUTHAL DENSITY - RIGHT QUADRANT DATA PARAMETERS USED IN POROSITY LOG CALCULATIONS: · . HOLE SIZE: ACAL - VARIABLE MUD WEIGHT: 9.6-9.8 PPG MUD SALINITY: 300 PPM CHLORIDES FORMATION WATER SALINITY: 25000 PPM CHLORIDES FLUID DENSITY: 1.0 G/GG MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/14 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE CALA FET GR PEF DRHO RHOB RH04 RH02 RH01 FCNT NCNT NPHI RPD RPM RPS RPX RHO 3 ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 3250.0 3267.0 3274.5 3288.5 3288.5 3288.5 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3312.5 STOP DEPTH 13145.5 13199.0 13207.0 13161. 5 13161. 5 13161.5 13161.5 13161.5 13161.5 13148.0 13148.0 13148.0 13199.0 13199.0 13199.0 13199.0 13161.5 13245.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------. BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD $ # REMARKS: BIT RUN NO MERGE TOP 2 3250.0 MERGE BASE 13245.0 MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type........... .......0 . Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units........ ...Feet Data Reference Point........... ...Undefined Frame Spacing................ .... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999.25 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Name DEPT ROP GR RPX RPS RPM RPD FET NPHI FCNT NCNT RHOB DRHO PEF CALA RH01 RH02 RH03 RH04 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Name DEPT ROP GR RPX RPS RPM RPD FET NPHI FCNT NCNT RHOB DRHO PEF CALA RH01 RH02 RH03 RH04 MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR PU-S CNTS CNTS G/CM G/CM B/E IN G/CM G/CM G/CM G/CM Units FT FT/H API OHMM OHMM OHMM OHMM HOUR PU-S CNTS CNTS G/CM G/CM B/E IN G/CM G/CM G/CM G/CM Size 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Nsam 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Rep 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 Code Offset o 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 Min 3250 5 43.82 0.58 0.07 0.14 0.09 0.16 8.4 487 100564 0.568 -2.285 2.03 8.45 1. 322 1.313 0.971 1.392 Max 13245 466 401.18 1489.81 1499.94 2000 2000 51.78 65.15 4548 201311 3.082 0.222 13 .47 10.21 3.089 3.03 2.974 2.994 Mean 8247.5 201.775 114.622 5.82583 5.8331 6.06316 8.19053 0.635673 33.0811 1065.99 134296 2.41749 0.0507752 3.3255 9.17693 2.41542 2.37747 2.40899 2.39961 First Reading For Entire File... ...... .3250 Last Reading For Entire File...... .... .13245 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Channel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Nsam 19991 19866 19866 19821 19821 19821 19821 19865 19719 19719 19719 19747 19747 19747 18899 19746 19746 19746 19746 . First Reading 3250 3312.5 3274.5 3289 3289 3289 3289 3267 3289 3289 3289 3288.5 3288.5 3288.5 3250 3289 3289 3289 3289 Last Reading 13245 13245 13207 13199 13199 13199 13199 13199 13148 13148 13148 13161.5 13161.5 13161.5 13145.5 13161. 5 13161.5 13161.5 13161.5 . Date of Generation...... .04/09/14 Maximum Physical Record. .65535 Fi1e Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name. ........... .STSLIB.002 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .04/09/14 Maximum Physical Record. .65535 File Type....... . . . . . . . . .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE CALA FET GR PEF RHOB DRHO RH04 RH03 RH02 RHO 1 FCNT NCNT NPHI RPD RPM RPS RPX ROP $ 2 . header data for each bit run in separate files. 2 .5000 START DEPTH 3250.0 3267.0 3274.5 3288.5 3288.5 3288.5 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3289.0 3312.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE STOP DEPTH 13145.5 13199.0 13207.0 13161.5 13161.5 13161.5 13161.5 13161.5 13161.5 13161.5 13148.0 13148.0 13148.0 13199.0 13199.0 13199.0 13199.0 13245.0 12-JUN-04 Insite 0.43 Memory 13245.0 3250.0 13245.0 56.1 63.8 TOOL NUMBER . DGR EWR4 CTN ASLD $ DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMP THERMAL NEUTRON AZIMUTHAL LITHO-DENS # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Da ta Record Type. . . . . . . . . . . . . . . . . . 0 Data Specification Block Type... ..0 Logging Direction....... ........ ..Down Optical log depth units. . . . . . . . . . .Feet Data Reference Point............ ..Undefined Frame Spacing........... ......... .60 .1IN Max frames per record........... ..Undefined Absent value.................... ..-999.25 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 124725 151812 185457 105075 8.500 3302.0 LSND 9.70 36.0 9.3 250 7.0 5.000 2.561 5.200 4.000 72.0 147.0 7.2 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 NPHI MWD020 PU-S 4 1 68 32 9 FCNT MWD020 CNTS 4 1 68 36 10 NCNT MWD020 CNTS 4 1 68 40 11 RHOB MWD020 G/CM 4 1 68 44 12 DRHO MWD020 G/CM 4 1 68 48 13 PEF MWD020 B/E 4 1 68 52 14 CALA MWD020 IN 4 1 68 56 15 RH01 MWD020 G/CM 4 1 68 60 16 RH02 MWD020 G/CM 4 1 68 64 17 . . RH03 MWD020 G/CM 4 1 68 68 18 RH04 MWD020 G/CM 4 1 68 72 19 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3250 13245 8247.5 19991 3250 13245 ROP MWD020 FT/H 5 466 201.775 19866 3312.5 13245 GR MWD020 API 43.82 401.18 114.622 19866 3274.5 13207 RPX MWD020 OHMM 0.58 1489.81 5.82583 19821 3289 13199 RPS MWD020 OHMM 0.07 1499.94 5.8331 19821 3289 13199 RPM MWD020 OHMM 0.14 2000 6.06316 19821 3289 13199 RPD MWD020 OHMM 0.09 2000 8.19053 19821 3289 13199 FET MWD020 HOUR 0.16 51.78 0.635673 19865 3267 13199 NPHI MWD020 PU-S 8.4 65.15 33.0811 19719 3289 13148 FCNT MWD020 CNTS 487 4548 1065.99 19719 3289 13148 NCNT MWD020 CNTS 100564 201311 134296 19719 3289 13148 RHOB MWD020 G/CM 0.568 3.082 2.41749 19747 3288.5 13161.5 DRHO MWD020 G/CM -2.285 0.222 0.0507752 19747 3288.5 13161.5 PEF MWD020 B/E 2.03 13 .47 3.3255 19747 3288.5 13161.5 CALA MWD020 IN 8.45 10.21 9.17693 18899 3250 13145.5 RHOl MWD020 G/CM 1. 322 3.089 2.41542 19746 3289 13161.5 RH02 MWD020 G/CM 1.313 3.03 2.37747 19746 3289 13161.5 RH03 MWD020 G/CM 0.971 2.974 2.40899 19746 3289 13161. 5 RH04 MWD020 G/CM 1. 392 2.994 2.39961 19746 3289 13161.5 First Reading For Entire File..... .... .3250 Last Reading For Entire File.......... .13245 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/09/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF Tape Trailer Service name........... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/14 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/14 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.... . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services . . Physical EOF Physical EOF End Of LIS File