Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-100 e -- Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 0 y.. - j CJ () Well History File Identifier Organizing (done) o Two-sided 11111111111 ""1111 o Rescan Needed """1111111111111 R9CAN \6' Color Items: o Greyscale Items: DIGITAL DATA ~skettes No. ~ o Other, NofType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: o Other:: BY: ~ Date cr /1S'/D0 Isl Mf Project Proofing 11111111111111 11II1 BY: ~ Date q IISf Ob ..2... X 30 = (p 0 Date 1/1S-/Dh /sl rvlP Scanning Preparation BY: ~ + J LJ. = TOTAL PAGES 7lf (Count does not include cover sheet) IA A.f) 151 r vvl Production Scanning Stage 1 Page Count from Scanned File: 75 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: VÝES Date: q lIS/Db If NO in stage 1, page(s) discrepancies were found: 1111111111111111111 Stage 1 YES NO 151 /M P NO BY: ~ BY: Maria Date: /5/ 1/11/111111I1111111 Scanning is complete at this point unless rescanning is required. ReScanned 11111111111111 1111I BY: Maria Date: /5/ Comments about this file: Quality Checked 11/111/1111I 111111I 10/6/2005 Well History File Cover Page. doc • • -.g~~ _ MICROFILMED 03/01 /2008 DO NOT PLACE ~: -. ~:. ~. ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc I~ DATA SUBMITTAL COMPLIANCE REPORT 9/11/2006 Permit to Drill 2041000 Well Name/No. MILNE PT UNIT SB 1-17L2 Operator BP EXPLORATION (ALASKA) INC 5,1 u J.. :¿J .JfJ¡~ ~ '1 API No. 50-029-23212-61-00 MD 9226' TVD 3836'; Completion Date 8/1/2004 / Completion Status 1-01L Current Status 1-01L UIC N .~---~ ~_._~-~~ -- ~--'._~~~ ~,-~. REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes -'~~~- -~-~~ -,~~- DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, IFR/CASANDRA, ABI, GYRO Well Log Information: (data taken from Logs Portion of Master Well Data Maint Log/ Electr Data Digital Dataset Log Log Run Interval OH/ ~ed/Frmt Number Name Scale Media No Start Stop CH Received Comments - C Lis 13528 Induction/Resistivity 112 9226 Open 2/22/2006 ROP DGR EWR plus ¥D Graphics Asc Directional Survey 4791 9226 9/3/2004 /,:t Directional Survey 4791 9226 9/3/2004 fli Directional Survey 4791 9226 9/3/2004 IIFR SURVEY ~ D Asc Directional Survey 4791 9226 9/3/2004 IIFR SURVEY ~ D Lis 12773 Gamma Ray 267 9165 9/14/2004 MPT, GR, EWR4, ROP 12773 LIS Verification 267 9165 9/14/2004 MPT, GR, EWR4, ROP ED D Li!. 12774 ~a Ray 2~7 768? ~/14/2004- MPT, GR,..EWR'I, ROP Rpt 12774 Lt3 Vé'hfication 26'7'- 7G02 9/14/2004 MP I , ~, EWR4, ROP -_.~-~~_.~--, Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments . . ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? v J t4 Daily History Received? ~N Formation Tops '(Jy N Analysis Received? ~ ~--~---~---~ _'w__..__·__._~ ~---,_._---,._.._--_. Comments: DATA SUBMITTAL COMPLIANCE REPORT 9/11/2006 Permit to Drill 2041000 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23212-61-00 Well Name/No. MILNE PT UNIT SB 1-17L2 MD 9226 TVD 3836 Completion Date 8/1/2004 ~om;'~" R.vlewed BY'· _ .~ _ UIC N Completion Status 1-01L Current Status 1-01L Dot., ItJif ~-þ -~--- . . · . WELL LOG TRANSMITTAL ()C1- OCJg ¡tJs~1 ~04 - I 00 f35d~ To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 RE: MWDFonnationEvaluationLogs MPI-17L1 +L1 PB1 +L2, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPI-17 Ll + Ll PBl + L2: LAS Data & Digital Log Images: 50-029-23212-60, 70, 61 1 CD Rom ~~ 9-!9-0/O{j) ~tJ cf- 10-0 . . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Robin Deason 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 September 07, 2004 RE: MWD Fonnation Evaluation Logs MPI-17 L2, AK-MW-3171003 1 LIS fonnatted Disc with verification listing. API#: 50-029-23212-61 'I' dv JJ) ~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-66~2 Date Iff Qo/~ RECEIVED SEP 1 .~ 2004 RECEIVED SEP \ . 2004 Alaska Oil & Gas Cons. CommîSS!(Jf; AnchorÐge .Alaska 01. <. ." .'\il¡~ ....,"'lIlmssion ;\(,;-jv¡f~ge · STATE OF ALASKA I ALASKA~L AND GAS CONSERVATION COM 'SION WEll COMPLETION OR RECOMPlETION REPORT AND lOG 1a. Well Status: IBI Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 One Other 5. Date Comp., Susp., or Aband. 8/1/2004 / 6. Date Spudded 7/27/2004 ./ 7. Date T.D. Reached 7/29/2004 8. KB Elevation (ft): KBE = 68.35' 21. Logs Run: MWD , GR , RES, IFRlCASANDRA , ABI , GYRO CASING, LINER AND CEMENTING RECORD SETTINGDEF'TtfMD S¡:;TTINGæ!>1"HTV\) H()ÞE;: BoTTOM Top ~OTTOM Size 112' 34' 112' 42" 2378' 35" 2339' 13-1/2" 4840' 33' 3887' 9-7/8" 9188' 3872' 3871' 6-3/4" o GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2323' NSL, 3581' WEL, SEC. 33, T13N, R10E, UM Top of Productive Horizon: 2379' NSL, 95' WEL, SEC. 32, T13N, R10E, UM (OA) Total Depth: 3273' NSL, 4373' WEL, SEC. 32, T13N, R10E, UM (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 551790 y- 6009440 Zone- ASP4 " - TPI: x- 549996 y- 6009483 Zone- ASP4 Total Depth: x- 545709 ~ y- 6010350 - Zone- ASP4 18. Directional Survey IBI Yes 0 No No. of Completions 22. CASING SIZE 20" 92# 45.5# 29.7# 12.6# H-40 L-80 L-80 L-80 34' 35' 33' 4794' 10-3/4 " 7-5/8" 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Liner MD TVD MD TVD 4904' - 9145' 3905' - 3877' 26. Date First Production: August20,2004 Date of Test Hours Tested 8/19/2004 12 Flow Tubing Casing Pressure Press. 9. Plug Back Depth (MD+ TVD) · 9226 + 3867 10. Total Depth (MD+TVD) .¡ 9226 + 3867'¡ 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL SIZE 2-7/8", 6.5# x 12.6#, L-80 DEPTH INTERVAL (MD) PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Electric Submersible Pump Oll-Bsl GAs-McF WATER-Bsl 1177 227 0 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none"í"'êôWlr".:ŒHCi1f1.; E- ('E IVED. t I!MTI-" .. ..- \J l~~~,~;~-:'- ¡ 0 R 1 G t N ^ L 1 2004 SEP ~ 1 lÛÙ1 \f'l".': I., . /-\ SEP 6 . '.:.¿~:;~:.-_:J PRODUCTION FOR TEST PERIOD ... CALCULATED ....... 24-HoUR RATE""'" Oil -Bsl 2354 27. None RßDYSBtL Form 10-407 Revised 12/2003 GAs-McF 454 WATER-Bsl o CONTINUED ON REVERSE SIDE 1b. Well Class: IBI Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 204-100 13. API Number 50-029-23212-61-00 14. Well Name and Number: MPI-17L2 15. Field I Pool(s): Milne Point Unit / Schrader Bluff Ft Ft 16. Property Designation: ADL 025517 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) r-/l"'¡¡~.;."W t./Bl¡c' "'')1> ¡c :6 f'S7''f'I/p Ät> ~~<f~ 260 sx Arctic Set (Approx.) 396 sx AS Lite, 257 sx Class 'G' 765 sx Class 'G' Uncemented Slotted Liner DEPTH SET (MD) 4738' PACKER SET (MD) AMOUNT & KIND OF MATERIAL USED I GAS-Oil RATIO 193 Oil GRAVITY-API (CORR) CHOKE SIZE ''1<;i<a Oil & Gas Cons. Commi: ~ r- Am:tmritge 28. . GEOLOGIC MARKERS 29. 4ItORMATION TESTS NAME MD rvD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBD-OA 4410' 4430' 4469' 4486' 4545' 4569' 4581' 4591' 4616' 4744' 4844' 9151' 3735' 3743' 3758' 3764' 3785' 3794' 3798' 3802' 3811' 3855' 3888 3876' None . 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Technical Assistant Date C51 - Il:) - ut Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Skip Coyner, 564-4395 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only Tree: 2-9/16" - 5M FMC t Wellhead: 11" x 7-1/16" 5M Gen 5A, w 2-7/8" FMC Tbg, gr., 3" LH Acme on top and 2-7/8" EU 8rd on bottom, 2.5" CIW BPV Profile ~ 20" x 34" insulated, 215 lIft A-53 OJÐ 103/4" 45.5 ppf K-55 BTRC (Drift ID = 9.794, cap. = .0961 bpf) 10 3/4" Howco Float Shoe I 2378' I ~ 75/8" 29.7 ppf, L-80, BTRC-mod casing (Drift ID = 6.750", cap = 0.0459 bpf) (Cap wI tbg = .0379 bpf) 2-7/8" 6.5 ppf, L-80 8rd eue tbg. (drift id '= 2.347" cap'" .00592 bpf) KOP @ 450' 50+ degree from 3200' Max hole angle'" 69 degrees @ +4460' Window in 75/8" Casing @ 4840' - 4852' Well Angle @ window'" 70° Baker Tie Back Sleeve 4794' Baker ZXP Liner Top Packer 4805' Baker Hook Hanger LEM 4828' - 4860' Baker Hook Wall Hanger inside 7·5/8" Window 4835' Baker Hook Wall Hanger outside 7·5/8" Window 4852' Window in 7-5/8" Casing @ 5053' - 5065' Well Angle @ window'" 78° Baker Tie Back Sleeve 4991' Baker ZXP Liner Top Packer 5002' Baker Hook Hanger LEM 5038' - 5073' Baker Hook Wall Hanger inside 7-5/8" Window 5048' Baker Hook Wall Hanger outside 7-5/8" Window 5071' Baker Tie Back Sleeve 5213' Baker ZXP Liner Top Packer 5224' Baker 7-5/8" x 5" HMC Liner Hanger 5231' ~ ~~ /~ 7-5/8" Weatherford Float Collar 5688' 7-5/8" Weatherford Float Shoe 5775' MPI-17!LI! Q.~.e~~:~.: l C,moo 2-7m" ,," KBMM Gas lift mandrel 69.30' (Doyon 14) 30.40' (Doyon 14) 146' Camco 2-7/8" x1" KBMM Gas lift mandrel 2022' .. Camco 2-7/8" x1" KBMM Gas lift mandrel 4470' HES XN-Nipple (2.250" id) 4626' Tandem Pump, 122 stg. GC2200 GPMTAR 1:1 4679' Tandem Intake - Gas Separator Model - GRSTXBARH6 Tandem Seal Section, Series 513 GSB3 DB UT/L T IL H6 PFS AFLAS IHSN 4700' 4705' Motor, 152 KMH 2325 volt 140 amp, 4719' PumpMate w/6 fin centralizer 4733' l... 6 1/8" Hole td @ 9225' HES "V" Float shoe 9188' "V""",,! . OA Lateral 102 jts. - 4 1/2" Slotted liner Rat Hole 12.6# L-80 IBT ('-') 37' rssssss<.<r 1""'''''''''1 OB Lateral ~ 1/ /' /' / /' / / /' /' I 98 jts. - 4 1/2" Slotted liner 12.6# L-80 IBT (5116'-9190') rSSSSS>S1 I , , , , , , , , fI 61/8" Hole td @ 9260' Btm Baker Float Shoe 9230' . Rat Hole 30' ~ :t6 1/8" Hole td @9253' Btm Baker 41/2" "V" Float Shoe 9232' ~ I"/Y/'/'U/'/'/'/'/'ff//'//'///'/'..v//////~. Rat Hole NB Lateral 47 jts. - 4", 9.5# L-80, IBT Blanks and 20' 39 jts Baker Med Excluder Screen (6245' - 9190') V////H//////// // h'/ / h'///// //J ~ DATE 0812/04 REV. BY COMMENTS Lee Hulme Drilled & Completed Doyon 14 MILNE POINT UNIT WELL 1-17!LJ/LZ API NO: 50-029-2321 2-00 BP EXPLORATION (AI<) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 7/11/2004 8/1/2004 Spud Date: 7/11/2004 End: 7/10/2004 00:00 - 01 :00 1.00 MOB P PRE Get floor ready to skid for move 01 :00 - 02:00 1.00 MOB P PRE Skid rig floor from drlg position to move position 02:00 - 05:30 3.50 MOB P PRE Drillers side front steering rams not moving to 90 degree angle - Mechanic diagnose problem 05:30 - 08:30 3.00 MOB P PRE Move rig off well MPJ-25 08:30 - 09:30 1.00 MOB P PRE Install back boosters 09:30 - 11 :00 1.50 MOB P PRE Pick up matting boards and herculite around well MPJ-25 11 :00 - 15:00 4.00 MOB P PRE Front boosters will only turn one way - Electrican diagnose problem 15:00 - 18:00 3.00 MOB P PRE Move rig from J-Pad to I-Pad 18:00 - 19:30 1.50 MOB P PRE Remove Front boosters 19:30 - 20:00 0.50 MOB P PRE Finish laying rig mats 20:00 - 21 :00 1.00 MOB P PRE Move rig on mats to other side of I-Pad 21 :00 - 22:00 1.00 MOB P PRE Pick up double mats 22:00 - 00:00 2.00 MOB P PRE Lay herculite and mats for well MPI -17 7/11/2004 00:00 - 01 :00 1.00 MOB P PRE Spot Rig Over Well - Accept Rig For Well Work At 00:01 hrs On 7/11/04 - Time Moved Back 3 Hours Due To Time Spent Removing Double Matting Boards - Laying Herculite And Single Matting Boards Because Of Poor Pad Conditions. 01 :00 - 02:00 1.00 MOB P PRE Skid rig floor from move position to drlg position 02:00 - 03:00 1.00 MOB P PRE Rig up rig floor - Spot rock washer and berm - spot tiger tank and hook up 03:00 - 05:00 2.00 RIGU P PRE Nipple up Divertor 05:00 - 08:30 3.50 RIGU P PRE Install Divertor line - Mix spud mud - Load pipe shed 08:30 - 17:30 9.00 DRILL P SURF Pick up 4" dp - Stand back in derrick - Pick up 5" HWT / Jars - Stand back in derrick 17:30 - 18:30 1.00 DRILL P SURF Pick up BHA to rig floor - Perform Derrick Inspection 18:30 - 19:30 1.00 DRILL P SURF Make up bit - motor - Stand HWT - Rig up HOWCO slickline for gyro runs 19:30 - 20:00 0.50 BOPSUF P SURF Function Test Divertor / Knife Valve - Perform Accumulator test - Gas Monitor Test - Witness of test waived by Chuck Sheave with AOGCC 20:00 - 20:30 0.50 DRILL P SURF Pre Spud meeting with all personnel on rig - Check mud system - Check surface lines for leaks - Fill Riser check for leaks - 20:30 - 22:30 2.00 DRILL P SURF Spud in well - Directional Drill from 114' to 314' - WOB 20 - RPM 70 - Ta on 2 - off 2 - GPM 395 - PP on 1250 - off 1050- PU 80 - SO 80 - ROT 80 22:30 - 00:00 1.50 DRILL P SURF POH - Make up MWD - Flex DC's - Orient - RIH to 314' 7/12/2004 00:00 - 06:00 6.00 DRILL P SURF Directional Drill from 314' to 728' - WOB 20 - RPM 70 - Ta on 2 - off 2 - GPM 395 - PP on 1250 - off 1050 - PU 80 - SO 80- ROT 80 06:00 - 07:30 1.50 DRILL P SURF Circ and reciprocate pipe while conference call to town on Directional Work - GPM 150 - PP 260 07:30 - 19:30 12.00 DRILL P SURF Directional Drill from 728' to 1972' - WOB 30 - RPM 80 - Ta on 4.5 - off 2 - GPM 500 - PP on 2030 - off 1870 - PU 97 - SO 90- ROT 93 - Hydrates encountered @ 1780' to 1950' mud cut from 9.4 to 8.7+ 19:30 - 20:30 1.00 DRILL P SURF CBU 3 X - GPM 500 - PP 1950 20:30 - 21 :30 1.00 DRILL P SURF Pump out to HWT - From 1972' to 444' - (No Problems) 21 :30 - 22:00 0.50 DRILL P SURF RIH from 444' to 1972' - Hole good 22:00 - 00:00 2.00 DRILL P SURF Directional Drill from 1972' to 2262' - WOB 15 to 30 - RPM 80 - Ta on 5 - off 2 - GPM 500 - PP on 1950 - off 1980 - PU 103- Printed: 8/3/2004 9:14:56 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/12/2004 22:00 - 00:00 2.00 DRILL P SURF SO 92 - ROT 95 7/13/2004 00:00 - 02:30 2.50 DRILL P SURF Directional Drill From 2262' to 2388' - T.D. 131/2" hole - WOB 15 to 30 - RPM 80 - TO on 5 - off 3 - GPM 500 - PP 2050 on - 1780 off - PU 105 - SO 93 - ROT 96 02:30 - 04:00 1.50 DRILL P SURF CBU 3 X - GPM 500 - PP 2000 - RPM 80 - TO 2 04:00 - 06:00 2.00 DRILL P SURF Flow Check - Pump out to HWT - From 2388' to 444' @ drilling rate 500 gpm - No Problems 06:00 - 06:30 0.50 CASE P SURF Flow Check - RIH tag bridge @ 851' 06:30 - 07:00 0.50 CASE P SURF Work through bridge from 851 to 855' 07:00 - 08:00 1.00 CASE P SURF RIH from 855' to 2388' - Hit soft bridges @ 1550',1814', and 2085' 08:00 - 10:00 2.00 CASE P SURF CBU 3 X - 80 RPM TO 2K - GPM 500 - PP 1830 10:00 - 11 :30 1.50 CASE P SURF Pump out from 2388' to HWT @ 444' - No problems 11 :30 - 13:00 1.50 CASE P SURF Lay down BHA - 13:00 - 13:30 0.50 CASE P SURF Clear rig floor 13:30 - 15:00 1.50 CASE P SURF Rig up to run 103/4" casing - PJSM 15:00 - 17:30 2.50 CASE P SURF Run 6 Joints L-80 45.5# BTC casing and 50 joints K-55 45.5" BTc casing total 56 jts 45.5# BTC 103/4" ran - Bridge at 852'- Beat casing through bridge - taking weigth from 2050' to 2343' - Break circ and circulate last joint down - Pick up landing joint 1 casg hanger - Make up RIH from 2343' to 2378' land. 17:30 - 18:00 0.50 CASE P SURF Lay down Franks fill up tool - Make up Dowell Schlumberger cementing head - cement lines 18:00 - 20:00 2.00 CASE P SURF Circulate and condition for cement job - stage up from 3 bpm to 8 bpm @ 340 psi 20:00 - 22:00 2.00 CEMT P SURF Give to Dowell - Pump 5 bbls water - Test lines to 3500 psi - Pump 25 bbls water (one gallon dye in first 5 bbls pumped) 5 bpm @ 170 psi- Swap to rig pumps flush with 20 bbls treated water 5 bpm 170 psi - Swap to Dowell pump 20 bbls CW-100 5 bpm @ 200 psi - Pump 75 bbls Mud Push mixed at 10.3 ppg 5 bpm @ 200 psi - Drop Top plug last 5 bbls pumped Pump 313 bbls Type "ASL" yield 4.44 cflsx mixed @ 10.7 ppg 6.5 bpm @ 350 psi - Dye back after pumping 296 bbls Lead - Switch to Class "G" after 313 bbls pumped Pump 53.5 bbls Class "G" yield 1.17 cflsx mixed @ 15.8 ppg 5.5 bpm @ 500 psi - Kick out Bottom plug with 20 bbls water with Dowell 5 bpm @ 450 psi - Give to Rig - Displace with 190 bbls mud 8 bpm @ 500 psi - Bump plug with 1500 psi 1000 psi over Hold pressure for 2 mins - Bleed off - Floats holding - 87 bbls good cement to surface Cement in place 22:00 hrs 22:00 - 23:30 1.50 CASE P SURF Rig down Cementing Head 1 Cementing lines - Clear rig floor - Flush Divertor - Lay down landing joint - Lay down Casing tools 23:30 - 00:00 0.50 CASE P SURF ND Divertor 7/14/2004 00:00 - 00:30 0.50 CASE P SURF Nipple Down Divertor 00:30 - 01 :00 0.50 CASE P SURF Install Tubing 1 Casing heads - Test to 1000 psi for 10 mins 01 :00 - 03:00 2.00 CASE P SURF Nipple up BOP's 03:00 - 03:30 0.50 CASE P SURF Rig up to test BOP's - Install test plug - Open annulus valve Printed: 8/312004 9:14:56 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/14/2004 03:30 - 07:00 3.50 CASE P SURF Test BOP's - Annular 250 low 2500 high for 5 mins each test- Pipe rams - Blind rams - Choke manifold - HCR Kill I Choke - Manual Kill / Choke· Upper IBOP / Lower IBOP - Floor safety valves to 250 low 3500 high for 5 mis each test - Perform Accumulator test - Witness of BOP test waived by Lou Grimaldi with AOGCC. 07:00 - 07:30 0.50 CASE P SURF Pull test plug - Install wear ring - Close annulus valve 07:30 - 09:30 2.00 CASE P SURF Make up BHA - Surface test MWD 402 gpm @ 1540 psi 09:30 - 10:30 1.00 CASE P SURF RIH to 2265' - Break circulation - Rig up testing equipment 10:30 - 11 :00 0.50 CASE P SURF Test 10.75" casing to 2000 psi for 30 mins - Test good 11 :00 - 12:30 1.50 DRILL P SURF Drill float collar @ 2290' - Float shoe 2376' - Clean out to 2388' - Drill from 2388' to 2408' - Circ hole clean 12:30 - 13:00 0.50 DRILL P SURF FIT - Mud weight 9.2 ppg - surface pressure 340 psi - Pressure bleed off to 110 psi EMW = 10.2 ppg 13:00 - 13:30 0.50 DRILL P INT1 Drill from 2408' to 2438' 13:30 - 15:00 1.50 DRILL P INT1 Circulate and condition hole for FIT 15:00 - 15:30 0.50 DRILL N DPRB INT1 FIT - Mud weight 9.3 ppg - surface pressure 340 psi - Pressure bleed off to 120 psi EMW = 10.3 ppg 15:30 - 00:00 8.50 DRILL P INT1 Directional Drill from 2438' to 3416' - WOB 15 to 25 - RPM 80- TO on 5k - off 3k - GPM 460 - PP on 2740 - off 2500 - PU 120- so 90 - ROT 106 7/15/2004 00:00 - 01 :00 1.00 DRILL P INT1 CBU 2 X - GPM 453 . PP 2440 - RPM 84 - TO 5K 01 :00 - 02:00 1.00 DRILL P INT1 Pump out to shoe - from 3416' to 2350' at drlg rate 02:00 - 03:00 1.00 DRILL P INT1 CBU 1 X - GPM 453 - PP - RPM 40 - TO 3k GPM 168 to 450- PP 600 to 1700 - Clay balls - Plugging flow line - augar line 03:00 - 03:30 0.50 DRILL N DPRB INT1 FIT - Mud weight 9.3 ppg - MD 2378' - TVD 2339' - Surface pressure 250 bled to 150 in 10 mins EMW = 10.53 - Bump up pressure from 150 to 270 psi - bled to 170 in 10 mins EMW = 10.69 03:30 - 05:00 1.50 DRILL P INT1 Cut Drlg line - Top Drive Service - Rig Service 05:00 - 05:30 0.50 DRILL P INT1 RIH From 2350' to 3416' 05:30 - 12:00 6.50 DRILL P INT1 Directional Drill from 3416' to 4183' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2740 - off 2500 - PU 130 - SO 90 - ROT 106 - POH due to lost signal from pulsar 12:00 - 13:30 1.50 DRILL N DFAL INT1 CBU 3 X - GPM 500 - PP 2500· RPM 80 -TO 5 13:30 - 14:30 1.00 DRILL N DFAL INT1 Pump out ot shoe from 4183' to 2370' 14:30 - 15:00 0.50 DRILL N DFAL INT1 CBU 1 X - Flow check well - Well static - Pump dry job 15:00 - 15:30 0.50 DRILL N DFAL INT1 POH to HWT from 2370' to 445' 15:30 - 18:00 2.50 DRILL N DFAL INT1 BHA stand back HWT - Flex De's - Down load MWD Check out problem of not getting signal - Found clay and two fairly large pieces of shale on top of pulsar - change out pulsar - Install smaller screens in suction pods - Circulated across shaker screens while gunning up suction pit - Make up bit - BHA - MWD - Surface test MWD - Install 5" DP screen in 5" HWT while surface test MWD to see if any more shale I clay is captured in screen - Pull DP screen out of 5" HWT 18:00 - 20:00 2.00 DRILL N DFAL INT1 RIH from 445' to 4100' - filling pipe every 25 std - Precauctionary wash from 4100' to 4183' 20:00 - 22:00 2.00 DRILL P INT1 Direcrtional Drill from 4183' to 4375' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2540 - off 2300 - PU 130 - SO 94 - ROT 106 22:00 - 23:30 1.50 DRILL P INT1 Circulate hole clean on top N-sands - GPM 500 - RPM 80 - PP 2300 Printed: 8/312004 9:14:56 AM e 4t Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/15/2004 23:30 - 00:00 0.50 DRILL P 7/16/2004 00:00 - 17:00 17.00 DRILL P 17:00 - 19:00 2.00 CASE P INT1 19:00 - 20:30 1.50 CASE P INT1 20:30 - 21 :30 1.00 CASE P INT1 21 :30 - 00:00 2.50 CASE P INT1 7/17/2004 00:00 - 03:00 3.00 CASE P INT1 03:00 - 04:00 1.00 CASE P INT1 04:00 - 04:30 0.50 CASE P INn 04:30 - 06:00 1.50 CASE P INT1 06:00 - 07:00 1.00 CASE P INT1 07:00 - 08:30 1.50 CASE P INT1 08:30 - 11 :30 3.00 CASE P INT1 11 :30 - 12:00 0.50 CASE P INT1 12:00 - 16:00 4.00 CASE P INT1 16:00 - 16:30 0.50 CASE P INT1 16:30 - 18:30 2.00 CASE P INT1 18:30 - 21:00 2.50 CEMT P INT1 INT1 INT1 Directional Drill from 4375' to 4445' - WOB 15 to 25 - RPM 80 - TO on 5 to 10 - off 4 - GPM 500 - PP on 2550 - off 2300 - PU 150 - SO 90 - ROT 110 - (Top NA 4414' MD) Directional Drill from 4445' to 5785' T.D. 97/8" hole - (NB top sand 4475')(OA Sand Top 4848')(OB Sand Top 5066') - WOB 15 to 25 - RPM 80 - TO on 7 - off 5 - GPM 500 - PP on 2650- off 2540 - PU 125 - SO 85 - ROT 100 CBU 2 X - RPM 100 - TO 5k - GPM 460 - PP 2070 Flow check - Pump out to 4100' - Pump @ drilling rate - Hole good no problems - Flow check well RIH from 4100' to 5725' - Wash from 5725' to 5785' - No Problems CBU 3 X - RPM 100 - TO 5k - GPM 500 - PP 2519 - Heavy thick mud back while circulating bottoms up - 10.2 ppg Vis 130 with lots of cuttings - Dump 40 bbls heavy mud Flow Check - Pump out to shoe from 5785' to 2360' - Pump at drlg rate - No Problems CBU 2 X - Lots cuttings - Circulate hole clean - GPM 500 - PP 1900 - RPM 60 - TO 3k Flow check - Pump dry job - POH from 2360' to 444' Stand 1 HWT back in derrick - Lay down 9 7/8" BHA Pull wear ring - Install test plug - Change rams to 7 5/8" - Test door seal to 1500 psi Rig up 7 5/8" casing equipment Pick up and run 58 jts of 7 5/8" L-80 BTC-M 29.7# casing to shoe @ 2370' Circulate one casing volume Staging up from 2 bpm @ 250 psi to 6 bpm @ 380 psi PJSM - Con't RIH with 7 5/8" L-80 BTC-M 29.7# casing to 5739' - Total joints ran 140 plus two pup joints - Make up hanger and landing joint - RIH land casing on hanger @ 5774' - On trip in with casing break Circulation @ 3481',4502',5739'- (Shoe 5774.87' - Float collar 5688.37') Lay down Franks fill up tool - Make up Schlumberger Dowell cementing head - cementing lines Circulate two casing volumes - Condition mud for cement job - 6 bpm @ 350 psi - Reciprocate 15 foot strokes 1 stroke per min - PU 195 - SO 115 Give to Schlumberger Dowell - Pump 5 bbls CW-100 2 bpm @ 200 psi Test lines to 4000 psi Pump 20 bbls CW-100 3.5 bpm @ 300 psi Pump 35 bbls Mud push 3.5 bpm @ 280 psi Drop Bottom Plug Pump 158 bbls Class "G" cement mixed at 15.8 yield 1.16 cuftlsx - 760 sxs 6.2 bpm @ 750 psi Drop Top Plug Displace with Oil base mud - 6.4 bpm 1150 psi - Slow last 15 bbls to 2 bpm @ 825 psi - Bumped plug with 1825 psi - Pumped 262.5 bbls - Hold pressure for 5 mins - Bleed off - Floats holding - Reciprocated string while cementing and 165 bbls of displacement - String taking weight PU 220 - SO 100 - at 165 bbls displacement string taking weight down to 85 - set Printed: 8/3/2004 9: 14:56 AM e e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 7/11/2004 8/1/2004 Spud Date: 7/11/2004 End: 7/17/2004 18:30 . 21 :00 2.50 CEMT P INT1 on hanger for rest of displacement 21 :00 - 21 :30 0.50 CASE P INT1 Flush Cement line with 15 bbl water - Blow back to Schlumberger - Rig down cement lines - Cementing head 21 :30 - 22:30 1.00 CASE P INT1 Lay casing / cementing equipment down beaver slide 22:30 - 23:00 0.50 CASE P INT1 Rig up to void casg of Oil base mud to 60' - Void casg - Rig down same 23:00 - 23:30 0.50 CASE P INT1 Back out landing joint - Lay down same - Change out long bails - Change out to 5" elevators 23:30 - 00:00 0.50 CASE P INT1 Pick up 1 stand 5" HWT - Install 10 3/4" X 7 5/8" packoff as per FMC Tech - Lay down 1 stand 5" HWT 7/18/2004 00:00 - 00:30 0.50 CASE P INT1 Con't to install 10 3/4" X 7 5/8" packoff and test to 5000 psi for 10 mins - test good 00:30 - 01 :00 0.50 CASE P INT1 Inject 20 bbls water in outer annulus - 3 bpm @ 1050 ICP injection rate - FCP injection 900 psi 01 :00 - 02:00 1.00 CASE P INT1 Change casg rams to Drill Pipe Rams 2 7/8" X 5" - Change drill pipe saver sub on top drive 02:00 - 02:30 0.50 CASE P INT1 Test rams 2 7/8" X 5" rams to 250 low 3500 high 5 mins each test 02:30 - 03:00 0.50 CASE P INT1 Pull test plug - Install wear ring - Lay down test joint - Close annulus valves 03:00 - 05:30 2.50 CASE P INT1 Make up 6 3/4" BHA - Surface test MWD - GPM 276 @ 1960 psi 05:30 - 07:00 1.50 CASE P INT1 RIH to 5644' 07:00 - 08:00 1.00 CASE P INT1 Cut - drlg line - Top drive service 08:00 - 10:00 2.00 CASE P INT1 Test 7 5/8" casing to 2500 for 30 mins leaked off 100 psi 10:00 - 10:30 0.50 CASE P INT1 CBU - GPM 276 @ 2850 - RPM 40 - TO 2K 10:30 - 11:30 1.00 CASE P INT1 Test 7 5/8" casing to 2500 for 60 mins lost 150 psi 11 :30 - 13:00 1.50 DRILL P INT1 Drill F/C @ 5688' - Shoe tract - F/S - Clean out 10' rathole from 5775' to 5785' - 20' new hole from 5785' to 5805' 13:00 - 14:00 1.00 CASE P INT1 CBU - Condition mud for FIT - GPM 300 - @ 2600 psi - RPM 40 - TO 2K 14:00 - 15:00 1.00 EVAL P INT1 Rig up testing equipment for FIT - MD 5775' - TVD 3867' - Mud weight 9.6 - Surface pressure 480 psi = EMW 12.0 ppg - Rig down testing equipment 15:00 - 00:00 9.00 DRILL P PROD1 Directional Drill from 5805' to 6749' - WOB 2 to 5 - RPM 85- TO on 4.5k - off 2.5k - GPM 300 - PP on 3250 - off 3130 - PU 115 - SO - 80 - ROT 100 7/19/2004 00:00 - 08:30 8.50 DRILL P PROD1 Directional Drill from 6749' to 7656' - WOB 5 - RPM 80 - TO on 4.5 - off 3.5 - GPM 275 - PP on 3200 - off 3100 - PU 120 - SO 82 - ROT 103 08:30 - 10:00 1.50 DRILL P PROD1 CBU 3 X - GPM 275 - PP 2770 - RPM 80 - TO 3K - Flow check - Well static 10:00 - 12:00 2.00 DRILL P PROD1 Pump out at drlg rate from 7656' to 7276' - Back ream out from 7276' to 5741' (Shoe at 5775') 12:00 - 12:30 0.50 DRILL P PROD1 CBU - RPM 40 - TO 3K - GPM 330 - PP 3500 - Did not see any excessive cuttings on bottoms up 12:30 - 13:00 0.50 DRILL P PROD1 Rig service - Top Drive service 13:00 - 14:00 1.00 DRILL P PROD1 RIH from 5741' to 7563' - Precauctionary wash from 7563' to 7656' . Hole in good shape - No Problems 14:00 - 00:00 10.00 DRILL P PROD1 Drill From 7656' to 8617 - WOB 5 - RPM 80 - TO on 5.5 - off 4.5 - GPM 275 - PP on 3090 - off 2910 - PU 130 - SO 75- ROT 105 7/20/2004 00:00 - 06:00 6.00 DRILL P PROD1 Directional Drill from 8617 to 9253' with 275 GPM, 3100 psi, Printed: 8/312004 9: 14:56 AM e e legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRlll+COMPlETE DOYON DRilLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/20/2004 00:00 - 06:00 6.00 DRILL P PROD1 80 RPMs, 5K bit wt. 06:00 - 08:00 2.00 CASE P LNR1 Circ. Three bottoms up, with 100 RPMs, 315 GPM, 3900 psi 08:00 - 11 :00 3.00 CASE P LNR1 Pumping out to 7276, Back ream from 7276' to shoe 5,774, at full drilling rate. Hole in good condition. No packoff or drags. 11 :00 - 11 :30 0.50 CASE P LNR1 Circ bottoms up from csg shoe 5774, with 315 Gpm 3100 psi, 50 rpms. No increase in cutting with bottoms up. 11 :30 - 13:30 2.00 CASE P LNR1 Trip to bottom 9253', wash last stand to bottom 13:30 - 15:30 2.00 CASE P LNR1 Circ Three bottoms up with 100 rpms, 297 GPM, 3500 psi, 15:30 - 16:30 1.00 CASE P LNR1 Displace well with Excluder screen 9.60BM 16:30 - 19:30 3.00 CASE P LNR1 Pumping out of hole 9253 to 5775 with full drilling rate 19:30 - 20:00 0.50 CASE P LNR1 Circ bottoms up from csg shoe 5775 with 300 GPM, 2800 psi, 40 rpms 20:00 - 22:30 2.50 CASE P LNR1 Tripping out to BHA 22:30 - 00:00 1.50 CASE P LNR1 Lay down 3.5 hWdp, Jars Mwd,Mud motor 7/21/2004 00:00 - 01 :00 1.00 CASE P LNR1 Rig up to pickup 4" screen liner, PJSM 01 :00 - 06:00 5.00 CASE P LNR1 Picking up 4" screen and 4" blank liner with 4-1/2" space out tubing. Made up Baker Seal Bore Extension, Baker 7-5/8" liner hanger and ZXP liner top packer. 06:00 - 10:00 4.00 CASE P LNR1 Run in hole slowly with screen liner on 4" drill pipe. No problems. Tagged bottom at 9253' and pick up to set liner shoe at 9232'. PU weight 130K Slack off weight 78K. 10:00 - 11 :00 1.00 CASE P LNR1 Dropped 29/32" ball and pumped down at 3 bpm at 500 psi. Ball on seat - pressure up to 2200 psi to set liner hanger. Set down 20K to ensure hanger was set. Pressured up to 3500 psi to set ZXP packer. Bled off pressure. Closed annular preventer and attempted to test ZXP packer - would not test. Pressured up on drill pipe to 4000 psi. Closed annular preventer and tested ZXP packer to 1500 psi. Rotated 12 rounds to the right and released from liner. PU weight 115K. 11 :00 - 12:00 1.00 CASE P LNR1 Displaced out new OBM out of hole with old OBM at 70 spm @ 1220 psi. 12:00 - 14:30 2.50 CASE P LNR1 Flow check - negative. Pulled out of hole with 4" drill pipe and liner setting tool. 14:30 - 15:00 0.50 CASE P LNR1 Clear floor, pull wear ring 15:00 - 16:00 1.00 CASE P LNR1 Rig up and testing BOPS and manifold 250-3500 psi 5 min per test, Hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC., #3 valve leaking on choke manifold 16:00 - 17:30 1.50 CASE N SFAL LNR1 Repair # 3 Valve on Choke manifold 17:30 - 21 :00 3.50 CASE P LNR1 Finish testing BOPS and manifold 250-3500 psi 5 min per test, Hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC, install wear ring 21 :00 - 23:00 2.00 STWHIP P PROD2 Picking up 4 3/4 de and 3.5 hwdp and stand in derrick 23:00 - 00:00 1.00 STWHIP P PROD2 Slip and cut drilling line, service top drive 7/22/2004 00:00 - 00:30 0.50 STWHIP P PROD2 Finish cutting Drill line 00:30 - 03:30 3.00 STWHIP P PROD2 Picking up Whipstock BHA and space out 3.5 pipe, test MWD 03:30 - 05:30 2.00 STWHIP P PROD2 Tripping in with Whipstock to 5000' 05:30 - 06:00 0.50 STWHIP P PAOD2 Orient Whipstock 15 degrees to the right and set anchor with 10K down. Picked 8K over pickup weight to assure anchor was set. Set down 38K and shear running bolt on whipstock. 06:00 - 10:30 4.50 STWHIP P PAOD2 Milled window from 5053' to 5065' with 100 APM 270 GPM and 1700 psi. Continued with mills to 5077'. 10:30 - 11 :30 1.00 STWHIP P PAOD2 Pumped sweep and circulated 2 bottoms up 100 APM 340 Printed: 8/312004 9: 14:56 AM e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/22/2004 10:30 -11:30 1.00 STWHIP P PROD2 GPM 2710 PSI and 4K torque. Good cutting circulated out with sweep. 11 :30 - 13:30 2.00 STWHIP P PROD2 Monitor well - negative. Pulled out of hole with 4" drill pipe. 13:30 - 14:30 1.00 STWHIP P PROD2 Standing back 3.5 hwdp,and 4 3/4 DC,Laying down mills 14:30 - 15:30 1.00 STWHIP P PROD2 Clear floor, picked up stack flusher, flush Bop stack 15:30 - 16:30 1.00 STWHIP P PROD2 Picking up BHA # 6,6314 DS146H bit wi 6- 10 jets, 43/4 motor with 1.5 bend,float sub,stab,Mwd,3 flex dc,jars,2 3.5 Hwdp 16:30 - 18:30 2.00 STWHIP P PROD2 Test MWD tool, Trip in to 4966' 18:30 - 19:00 0.50 STWHIP P PROD2 Service top drive 19:00 - 19:30 0.50 STWHIP P PROD2 Orient to 15 degrees to right of high side, Slide thru window @ 5053 to 5064 19:30 - 00:00 4.50 DRILL P PROD2 Directional Drill 5077' to 5540' with 80 rpms, 275 GPM, 2900 psi, AST .76, ART 2.34, TO 3K, P/U 115K, Slo 88K.R/T 102K 7/23/2004 00:00 - 18:30 18.50 DRILL P PROD2 Directional Drill 5540' to 7746' with 80 rpms, 275 GPM, 3000 psi, out of sand @ 7746, AST 2.5, Art 7.27 18:30 - 19:00 0.50 DRILL N DPRB PROD2 Circ bottoms up 19:00 - 19:30 0.50 DRILL N DPRB PROD2 Pumped out to 7450 19:30 - 20:00 0.50 DRILL N DPRB PROD2 Working lowside trought to side track well, side track well @ 7462 20:00 - 21 :30 1.50 DRILL N DPRB PROD2 Time Drill from 7462 to 7555' 21 :30 - 00:00 2.50 DRILL P PROD2 Directional Drill 7555' to 7842' with 80 rpms, 275 GPM, 3000 ps, AST 1.54, ART 1.31, TO 3500, P/u 11 OK. S/o 80K, R/t 100K 7/24/2004 00:00 - 11 :30 11.50 DRILL P PROD2 Directional Drill 7842' to 9260' with 80 rpms, 275 GPM, 3200 psi, hole taking mud slow 11 :30 - 13:00 1.50 DRILL P PROD2 Circ and Reciprocate, with 310 gpm 3840 psi, 80 Rpms, treating mud, lower YP 13:00 - 15:00 2.00 DRILL P PROD2 Flow check, well breathing gave back 13 bbls in 10 min., pump out of well from 9260 to 7450 with 200 gpm 15:00 - 16:00 1.00 DRILL P PROD2 Worked side track, orient motor to high side, attempt to slide in to side track, went into old hole,worked in to new hole, orient to high side and back ream thru side track 16:00 - 16:30 0.50 DRILL P PROD2 Trip back to bottom, no problems 16:30 - 19:00 2.50 DRILL P PROD2 Circ three bottoms up with 297 gpm, 3270 psi, 80 Rpms, hole not taking any mud 19:00 - 23:30 4.50 CASE P PROD2 Flow check, well breathing small stream of mud, Pumping out with 200 gpm, orient to high side @ side track and back ream side track @ 7462, small packoff @ 7400, Pumping out to window, @ 5053, pull thru window with out pumping, flow check @ window well static 23:30 - 00:00 0.50 CASE P PROD2 Circ bottom up @ 5030, with 297 gpm 2770 psi, 40 rpms 7/25/2004 00:00 - 00:30 0.50 CASE P PROD2 Finish, Circ bottom up @ 5030, with 297 gpm 2770 psi, 40 rpms 00:30 - 02:00 1.50 CASE P PROD2 Tripping out to BHA 02:00 - 03:00 1.00 CASE P PROD2 Std back HWdp, Jars, flex dc, lay down MWD and Motor 03:00 - 03:30 0.50 CASE P PROD2 Clear rig floor, moblize whipstock Bha 03:30 - 04:00 0.50 CASE P PROD2 Service top drive 04:00 - 05:00 1.00 CASE P PROD2 Picking up whipstock retrival BHA, Hook, 1 jt drlg pipe,float sub, MWD,bumper sub, jars,11 dc, 15 hwdp, xo surface test MWD 05:00 - 06:30 1.50 CASE P PROD2 Trip in with whipstock hook to 5020 filling drillpipe every 25 stands Printed: 8/312004 9: 14:56 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/25/2004 06:30 - 07:00 0.50 CASE P PROD2 Oreint 15 degrees to the right and latch whipstock. Pulled free with 190K (70K overpull). Observed well. Hole took fluid to BOP stack. Monitor well. Well stable. 07:00 - 07:30 0.50 CASE P PROD2 Circulated bottoms up 07:30 - 09:30 2.00 CASE P PROD2 Pulled out of hole from 5080' at controlled speed 09:30 - 11 :30 2.00 CASE P PROD2 Stand back HWDP, Des and MWD. Laid down whipstock and seal assembly. 11 :30 - 13:00 1.50 CASE P PROD2 Clear floor, rig up to pickup 4.5 slotted liner, PJSM 13:00 - 16:30 3.50 CASE P PROD2 Pickup 98- 4.512.6# L-80 slotted liner and 2 -4.5 12.6# 1-80 blank jts, Baker Hook wall hanger 16:30 - 19:30 3.00 CASE P PROD2 Trip in with liner, went out window on first try, went in to 9229 with no problems,pickup wt 124k, slack off wt 87K, block wt. 50 K 19:30 - 20:00 0.50 CASE P PROD2 Hook liner after Three trys,@ 5065, shoe @ 9229' top liner 5048' 20:00 - 20:30 0.50 CASE P PROD2 Drop ball, pumped down @ 3 bbls min. 630 psi, pressure to 4250 to shear, and release liner, pull one stand to 4969' 20:30 - 22:00 1.50 CASE P PROD2 Slip and cut drilling line, service rig 22:00 - 00:00 2.00 CASE P PROD2 Tripping out with running tools, lay down same 7/26/2004 00:00 - 01 :00 1.00 CASE P PROD2 Clear rig floor, Rig up to pickup LEM tools,PJSM 01 :00 - 02:00 1.00 CASE P PROD2 Picking up Seals, 3 jts 4.512.6# L-80, Baker LEM tool and ZXP liner top packer 02:00 - 05:00 3.00 CASE P PROD2 Tripping in with LEM tool 05:00 - 06:30 1.50 CASE N DPRB PROD2 Trying to work LEM tool thru O-B hook wall hanger, going to 5078' 06:30 - 10:30 4.00 CASE N DPRB PROD2 Tripping out with LEM and lay down same, found scarring on mule shoe 10:30 - 15:30 5.00 CASE P PROD2 Pull wear ring, rig up, Test BOPS and manifold 250-3500psi 5 min. per test, Hydril 250-2500psi 5 min per test, the right to witness test was wavier by Jeff Jones AOOGC, install wear ring 15:30 - 19:00 3.50 CASE N DPRB PROD2 Waiting on New LEM tools, taking off Csg Swivel, putting bend in seal jt. 19:00 - 19:30 0.50 CASE N DPRB PROD2 Mobilize New LEM to pipe shed 19:30 - 20:30 1.00 CASE N DPRB PROD2 Pickup LEM and ZXP packer 20:30 - 23:30 3.00 CASE N DPRB PROD2 Tripping in to 5050 23:30 - 00:00 0.50 CASE P PROD2 Tag up @ 5078, pickup and turn 1/2 turn,tag same spot,pickup and turn 1/4 turn, tag same spot, pickup and turn 1/4 turn, tag same spot, pickup turn 1/4 turn went in to Latch point, Pick up wt. 11 OK, slack off 95K 7/27/2004 00:00 - 00:30 0.50 CASE P PROD2 Rig up pup jt and pump in subs, Latched in collet in O-B hook hanger, pull to 125K, slacked off with 25k on hanger, Seals @ 5246, Lem 5073 to 5037, Csg seal bore 5010, ZXP packer 4991' 00:30 - 01 :00 0.50 CASE P PROD2 Drop ball, pumped to seat with rig pump @ 3 bbls min. 650 psi, pump with First Energy and set packer with 3500 psi, Release from LEM with 3800 psi 01 :00 - 02:00 1.00 CASE P PROD2 Bleed drill pipe pressure to 500 psi, rig and test annulus to 2500 psi to test packer 02:00 - 03:00 1.00 CASE P PROD2 Attempt to shear ball with First Energy put 5100 psi on ball, 5 times wouldn't shear, rig down pump in sub and First Energy 03:00 - 05:30 2.50 CASE P PROD2 Tripping out wet with running tools, Laying down same 05:30 - 08:00 2.50 STWHIP P PROD3 Pickup up space out jts,whipstock,MWD,Orient same 11 dC,13 hwdp, surface test MWD Printed: 8/312004 9:14:56 AM Legal Well Name: Common Well Name; Event Name; Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 7/11 /2004 8/1/2004 Spud Date: 7/11/2004 End: 7/27/2004 08:00 - 10:00 2.00 STWHIP P PROD3 Trip in with whipstock 10:00 - 10:30 0.50 STWHIP P PROD3 Orient 17 degree to left of high side, set whipstock trip anchor w/22K, shear off 35K :9 p~ ~ V1: - \ ì l. 'Z... 10:30 - 15:30 5.00 STWHIP P PROD3 Mill window with 3-5K 65-100 rpms, 300 gpm, 2100 psi, Top of window 4840', Bottom window 4852', Drill to 4866' 15:30 - 16:30 1.00 STWHIP P PROD3 Pump sweep, Circ 1.5 bottoms up, work window 16:30 - 18:00 1.50 STWHIP P PROD3 Trip out to BHA 18:00 - 19:00 1.00 STWHIP P PROD3 Stand back DC and Hwdp, Lay down mills, mills full gauge 19:00 - 19:30 0.50 STWHIP P PROD3 Pickup Johnny Wacker, flush BOP stack 19:30 - 21 :30 2.00 STWHIP P PROD3 Clear floor, Pick up BHA #9 6 3/4 Bit with 6X10s, 5" sperry drii w/1.5 bend, float sub,stab,4 3/4 HCIM/RES/GR,4 3/4 DM,4 3/4 TM, 3 flex dc,jars,2 hwdp 21 :30 - 23:00 1.50 STWHIP P PROD3 Tripping in to 4774 23:00 - 00:00 1.00 STWHIP P PROD3 Slip and cut drilling line, service top drive 7/28/2004 00:00 - 00:30 0.50 DRILL P PROD3 Orient and slide thru window 00:30 - 20:30 20.00 DRILL P PROD3 Drilling 4856' to 6979' with 280 gpm, 2900 psi, 90 rpms, 3-10K J bit wt, P/U wt 120K, S/o 85K, R/t 100K, TQ 4K, Control drill, max 200 ft. per hr., AST 3.39, ART 8.53 20:30 - 22:00 1.50 DRILL P PROD3 Circ, three bottoms up,with 280 gpm, 2800 psi, 90 rpms 22:00 - 00:00 2.00 DRILL P PROD3 Pumping out to window @ 4869' with full drilling rate, pull thru window @ 4840-4852 with out pumping, pull to 4473, with out problems 7/29/2004 00:00 - 00:30 0.50 DRILL P PROD3 Circ bottoms up @ 4773 00:30 - 01 :00 0.50 DRILL P PROD3 Service top drive 01 :00 - 02:00 1.00 DRILL P PROD3 Trip to bottom, wash last stand to bottom 02:00 - 22:30 20.50 DRILL P PROD3 Drilling 6979' to 9225' with 280 gpm, 3200 psi, 90 rpms, 3-10K ... bit wt., Control drill, max 200 ft per hr, Drilled out of the top of the OA sand at 9155'. At 8700', the hole started taking mud 5- 8 bbls hr. 22:30 - 00:00 1.50 CASE P PROD3 Circ, three bottoms up with, 280 gpm, 3000 psi, 100 rpms 7/30/2004 00:00 - 01 :00 1.00 CASE P PROD3 Finish Circ three bottoms up with, 280 gpm, 3000 psi, 100 rpms 01 :00 - 04:30 3.50 CASE P PROD3 Pumping out to Window @ 4840-4852 with full drilling rate, pull thru window with out pumping, no problems 04:30 - 05:30 1.00 CASE P PROD3 Monitor well, Circ bottoms up, @ 4735 05:30 - 07:00 1.50 CASE P PROD3 POH 07:00 - 09:00 2.00 CASE P PROD3 Stand back BHA, Download MWD 09:00 - 10:00 1.00 CASE P PROD3 Pickup whipstock Hook and mwd BHA, orient same, surface test MW D 10:00 - 11 :00 1.00 CASE P PROD3 Rih with whipstock hook to 4780 11 :00 - 12:00 1.00 CASE P PROD3 Orient Hook and latch on to whipstock, pulled free 12:00 - 12:30 0.50 CASE P PROD3 Circ bottoms up 250gpm, 1700 psi 12:30 - 16:00 3.50 CASE P PROD3 Tripping out with whipstock, lay down same 16:00 - 17:00 1.00 CASE P PROD3 Clean floor, rig up to run slotted Iiner,PJSM 17:00 - 21 :00 4.00 CASE P PROD3 Picking up 4.5 Slotted liner, 102Jts, 4.5,12.6#, L-80, Slotted, 2 jts 4.512.6# L-80 Blanks jts, baker hook wall hanger, P/U wt. 97K, S/O 85K 21 :00 - 00:00 3.00 CASE P PROD3 Tripping in with liner, went thru window on first try,P/U 130K, S/o 80K, hooked window on on fourth try, Shoe 9188', top of hook wall hanger 4835' 7/31/2004 00:00 - 01 :30 1.50 CASE P PROD3 Pumped ball down 3 bbls min. pressure up, release from liner, pressure to 4,000 with rig pump couldn't shear ball, pull one stand rigged up test pump, shear ball with 4500 psi, P/U wt Printed: 8/312004 9: 14:56 AM e e Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-17 MPI-17 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 7/11/2004 Rig Release: 8/1/2004 Rig Number: Spud Date: 7/11/2004 End: 7/31/2004 00:00 - 01 :30 1.50 CASE P PROD3 115K 01 :30 - 03:30 2.00 CASE P PROD3 POH with running tools, lay down same 03:30 - 04:00 0.50 CASE P PROD3 Rig up to pickup LEM, PJSM 04:00 - 05:00 1.00 CASE P PROD3 Picking up LEM, Seal jt, 3 jts 4.512.6# L-80 tubing, LEM, CSG swivel,ZXP packer 05:00 - 07:30 2.50 CASE P PROD3 RIH with LEM, Landed on Hgr. 4835, seals @ 5024 07:30 - 08:00 0.50 CASE P PROD3 Drop ball, pump to seat @ 3 bbls min., 550 psi,pressure up to 2800psi for pusher tool, 3200 psi to set ZXP packer 08:00 - 09:00 1.00 CASE P PROD3 R/U First Engergy, shear ball with 5200 psi 09:00 - 11 :30 2.50 CASE P PROD3 Poh, lay down running tools 11 :30 - 13:00 1.50 CASE P PROD3 Pick up Johnny Wacker, Trip in to 4762' 13:00 - 15:00 2.00 CASE P PROD3 Displace well with 40 bbls LVT, 25 bbls HiV spacer, 40 bbls Safesurf, 25 bbls HIV spacer,9.6 brine inhibiter treated 15:00 - 16:00 1.00 CASE P PROD3 Slip and cut drill line 16:00 - 23:30 7.50 CASE P PROD3 Laying down drill pipe 23:30 - 00:00 0.50 CASE P PROD3 Clear rig floor, pull wear ring 8/1/2004 00:00 - 01 :00 1.00 RUNCOMP RUNCMP Change saver sub on topdrive 01 :00 - 03:00 2.00 RUNCOMP RUNCMP Moblize tubing to pipe shed, rig up to run tubing, PJSM, (waiting on ESP sheave, oil for motor) 03:00 - 08:00 5.00 RUNCOMP RUNCMP Picking up ESP assy, fill with oil, found broken wire on the end of motor, Repair same 08:00 - 14:00 6.00 RUNCOMP RUNCMP Picking up 2 7/8 1-80 1ST tbg., check conductivity and circ ever 1500', pickup total 144 jts, 14:00 - 16:30 2.50 RUNCONP RUNCMP make up to hanger, P/U 82K,S/0 72, 82 lesalle clamps run 16:30 - 17:00 0.50 RUNCOMP RUNCMP Land tubing with TWC in place,test twc to 1000 psi,End of I pump 4736, Top of pump 4678,XN 4626,GLM 4470,GLM 2022, GLM 145 17:00 - 18:00 1.00 RUNCOMP RUNCMP Nipple down SOPS, 18:00 - 21 :00 3.00 RUNCONP RUNCMP Nipple up 11" x 2 9/16 ESP adapter flange (had to change out dummy Penetrator) and CIW 2 9/16 5K tree, test both to 5000 psi, " 21 :00 - 22:00 1.00 RUNCONP RUNCMP Pull TWC and Set CIW 21/2 type H SPY, pump out cellar, secure well, Rig release for rig move @ 2200 hrs 8/1/2004 Printed: 8/312004 9: 14:56 AM REC~ED e ;<.~~¡ ¡1fO "l .J ,~ ;'1-- ~¡:D ·0 "; 0004 .....'....f ,J t.... AI_a Oil & GasQ>ns.CommiIiOn AnrA1cø9O 17 -Aug-04 AOGCC ,Robin D~ãðon 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITVE Re: Distribution of Survey Data for Well MPI-17 L2 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 4,791.87' MD 4,840.00' MD 9,226.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage,AK99518 4. / L ;:::e C:~¿~~-3545 ~:~ou :ave a~~D~~;:~~ Regards, William T. Allen Survey Manager Attachment(s) DEFINITIV Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17L2 e Job No. AKZZ3171003, Surveyed: 29 July, 2004 Survey Report 17 August, 2004 Your Ref: API 500292321261 Surface Coordinates: 6009439.29 N, 551789.57 E (70· 26'11.5176" N, 149· 34' 39.9045" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68. 35ft above Structure Reference SPElï'ï'\f-SUr, DRILLING sERViCeS A Halliburton Company Survey Ref: svy1447 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 Your Ref: API 500292321261 Job No. AKZZ3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin9s Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 4791.87 70.040 286.510 3802.46 3870.81 41.59 N 1747.17 W 6009468.75 N 550042.15 E 1732.85 Tie On Point 4840.00 70.300 285.540 3818.79 3887.14 ~ 54.09 N 1790.69 W 6009480.94 N 549998.55 E 1.971 1777.77 Window Point 4893.56 76.790 283.390 3833.96 3902.31 66.89 N 1840.40 W 6009493.40 N 549948.75 E 12.713 1828.86 4944.18 84.630 281.360 3842.12 3910.47 77.58 N 1889.16 W 6009503.75 N 549899.92 E 15.985 1878.68 4988.81 92.100 279.570 3843.40 3911.75 85.68 N 1932.99 W 6009511.54 N 549856.03 E 17.21 0 1923.24 e 5037.81 91.790 279.740 3841.73 3910.08 93.89 N 1981.27W 6009519.42 N 549807.69 E 0.721 1972.20 5085.20 91.230 279.890 3840.48 3908.83 101.97 N 2027.95 W 6009527.17 N 549760.96 E 1.223 2019.57 5134.44 91.670 280.060 3839.24 3907.59 110.49 N 2076.43 W 6009535.36 N 549712.42 E 0.958 2068.78 5181.48 89.510 277.760 3838.75 3907.10 117.78 N 2122.90 W 6009542.32 N 549665.91 E 6.707 2115.81 5230.16 91.910 275.630 3838.15 3906.50 123.45 N 2171.23 W 6009547.66 N 549617.53 E 6.591 2164.45 5278.17 91.670 275.100 3836.65 3905.00 127.94 N 2219.01 W 6009551.82 N 549569.73 E 1.211 2212.35 5325.50 91.420 274.720 3835.37 3903.72 131.99 N 2266.15 W 6009555.54 N 549522.56 E 0.961 2259.55 5373.13 90.680 272.330 3834.50 3902.85 134.92 N 2313.68 W 6009558.14 N 549475.01 E 5.252 2306.97 5421.98 89.320 274.290 3834.50 3902.85 137.74 N 2362.44 W 6009560.62 N 549426.23 E 4.883 2355.59 5469.34 88.760 275.290 3835.29 3903.64 141.69N 2409.63 W 6009564.24 N 549379.02 E 2.420 2402.82 5518.21 88.700 274.610 3836.38 3904.73 145.91 N 2458.30 W 6009568.12 N 549330.31 E 1.397 2451.57 5565.63 89.200 277.960 3837.25 3905.60 151.10 N 2505.42 W 6009572.98 N 549283.16 E 7.142 2498.92 5615.08 89.200 281.610 3837.94 3906.29 159.50 N 2554.14 W 6009581.05 N 549234.38 E 7.380 2548.35 5662.28 90.370 282.320 3838.11 3906.46 169.28 N 2600.32 W 6009590.51 N 549188.14 E 2.900 2595.48 5711.46 90.370 282.480 3837.80 3906.15 179.84 N 2648.35 W 6009600.74 N 549140.04 E 0.325 2644.57 5759.10 90.310 281.900 3837.51 3905.86 189.90 N 2694.91 W 6009610.47 N 549093.40 E 1.224 2692.12 5806.31 90.190 281.410 3837.31 3905.66 199.44 N 2741.15 W 6009619.69 N 549047.10 E 1.069 2739.27 e 5854.86 90.190 280.870 3837.15 3905.50 208.82 N 2788.78 W 6009628.74 N 548999.40 E 1.112 2787.79 5901.90 90.120 280.180 3837.02 3905.37 217.41 N 2835.03 W 6009637.01 N 548953.10 E 1.474 2834.80 5950.83 90.000 279.320 3836.97 3905.32 225.70 N 2883.25 W 6009644.96 N 548904.82 E 1.775 2883.73 5999.61 90.120 280.510 3836.92 3905.27 234.10 N 2931.30 W 6009653.03 N 548856.71 E 2.452 2932.50 6046.69 90.190 280.940 3836.79 3905.14 242.86 N 2977.56 W 6009661.47 N 548810.39 E 0.925 2979.55 6095.47 89.810 280.180 3836.79 3905.14 251.80 N 3025.51 W 6009670.07 N 548762.38 E 1.742 3028.31 6142.03 91.300 281.930 3836.34 3904.69 260.72 N 3071.21 W 6009678.68 N 548716.63 E 4.936 3074.83 6191.78 90.990 281.930 3835.35 3903.70 271.01 N 3119.87 W 6009688.63 N 548667.89 E 0.623 3124.50 6238.20 90.680 280.930 3834.67 3903.02 280.20 N 3165.37 W 6009697.51 N 548622.34 E 2.255 3170.86 6287.71 90.560 280.740 3834.13 3902.48 289.51 N 3213.99 W 6009706.48 N 548573.65 E 0.454 3220.34 6333.71 90.120 279.700 3833.86 3902.21 297.67 N 3259.26 W 6009714.32 N 548528.32 E 2.455 3266.32 6383.63 89.810 278.960 3833.89 3902.24 305.77 N 3308.52 W 6009722.07 N 548479.01 E 1.607 3316.24 6429.79 87.900 281.870 3834.81 3903.16 314.11 N 3353.90 W 6009730.10 N 548433.57 E 7.540 3362.37 17 August, 2004 - 10:12 Page 20f5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 Your Ref: API 500292321261 Job No. AKZZ3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin9s Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 DOft) 6479.37 89.260 283.480 3836.04 3904.39 324.98 N 3402.26 W 6009740.64 N 548385.14 E 4.250 3411.82 6524.55 90.000 283.750 3836.33 3904.68 335.62 N 3446.16 W 6009750.97 N 548341.16 E 1.744 3456.84 6574.30 89.880 283.390 3836.39 3904.74 347.29 N 3494.53 W 6009762.30 N 548292.72 E 0.763 3506.42 6620.25 89.690 283.020 3836.56 3904.91 357.79 N 3539.26 W 6009772.49 N 548247.91 E 0.905 3552.23 6670.61 89.200 282.510 3837.05 3905.40 368.91 N 3588.37 W 6009783.28 N 548198.72 E 1.404 3602.47 It 6716.33 90.740 282.650 3837.07 3905.42 378.87 N 3632.99 W 6009792.92 N 548154.03 E 3.382 3648.09 6768.69 90.620 282.620 3836.45 3904.80 390.32 N 3684.08 W 6009804.02 N 548102.87 E 0.236 3700.33 6812.15 90.250 282.570 3836.12 3904.47 399.80 N 3726.50 W 6009813.20 N 548060.39 E 0.859 3743.70 6861.96 89.630 281.040 3836.17 3904.52 409.99 N 3775.25 W 6009823.05 N 548011.56 E 3.314 3793.44 6908.49 89.140 280.020 3836.67 3905.02 418.49 N 3820.99 W 6009831.24 N 547965.76 E 2.432 3839.95 6956.48 88.890 279.610 3837.50 3905.85 426.67 N 3868.27 W 6009839.09 N 547918.43 E 1.001 3887.92 7004.47 88.830 282.400 3838.45 3906.80 435.83 N 3915.37 W 6009847.92 N 547871.27 E 5.814 3935.86 7053.39 88.090 284.210 3839.76 3908.11 447.08 N 3962.95 W 6009858.84 N 547823.61 E 3.996 3984.61 7100.78 87.780 283.670 3841.47 3909.82 458.49 N 4008.92 W 6009869.93 N 547777.56 E 1.313 4031.79 7149.68 88.760 283.950 3842.95 3911.30 470.16 N 4056.38 W 6009881.27 N 547730.02 E 2.084 4080.48 7196.36 89.510 284.210 3843.65 3912.00 481.51 N 4101.65 W 6009892.31 N 547684.67 E 1.700 4126.96 7245.18 90.060 284.550 3843.84 3912.19 493.64 N 4148.94 W 6009904.11 N 547637.30 E 1.324 4175.55 7291.97 89.940 284.400 3843.84 3912.19 505.33 N 4194.25 W 6009915.49 N 547591.91 E 0.411 4222.11 7340.95 89.810 283.680 3843.94 3912.29 517.22 N 4241.77 W 6009927.04 N 547544.31 E 1 .494 4270.89 7388.31 89.750 283.940 3844.13 3912.48 528.52 N 4287.76 W 6009938.02 N 547498.25 E 0.563 4318.07 7437.42 90.120 283.380 3844.18 3912.53 540.12 N 4335.48 W 6009949.29 N 547450.45 E 1.367 4367.00 7482.31 90.000 282.180 3844.13 3912.48 550.05 N 4379.25 W 6009958.92 N 547406.60 E 2.687 4411.79 e 7532.17 90.190 282.370 3844.05 3912.40 560.65 N 4427.97 W 6009969.18 N 547357.81 E 0.539 4461.56 7578.12 90.120 282.040 3843.93 3912.28 570.36 N 4472.89 W 6009978.58 N 547312.83 E 0.734 4507.43 7636.79 89.810 280.510 3843.96 3912.31 581.83 N 4530.42 W 6009989.65 N 547255.22 E 2.661 4566.04 7674.44 90.490 282.650 3843.86 3912.21 589.39 N 4567.30 W 6009996.95 N 547218.29 E 5.964 4603.64 7722.68 91.050 283.340 3843.22 3911.57 600.24 N 4614.30 W 6010007.47 N 547171.21 E 1.842 4651.75 7771.01 90.620 282.620 3842.51 3910.86 611.09N 4661.39 W 6010018.00 N 547124.05 E 1.735 4699.95 7819.68 90.930 283.260 3841.85 3910.20 621.99 N 4708.82 W 6010028.57 N 547076.54 E 1.461 4748.49 7867.38 90.800 282.480 3841.13 3909.48 632.61 N 4755.32 W 6010038.87 N 547029.97 E 1.658 4796.07 7915.99 91.670 283.860 3840.09 3908.44 643.69 N 4802.64 W 6010049.61 N 546982.58 E 3.355 4844.52 7963.38 91.290 282.950 3838.86 3907.21 654.67 N 4848.72 W 6010060.27 N 546936.42 E 2.080 4891.75 8012.18 90.800 282.200 3837.97 3906.32 665.29 N 4896.34 W 6010070.56 N 546888.73 E 1.836 4940.43 8059.44 91.730 283.290 3836.93 3905.28 675.71 N 4942.42 W 6010080.67 N 546842.57 E 3.031 4987.57 81 08.11 91.300 282.760 3835.64 3903.99 686.68 N 4989.82 W 6010091.30 N 546795.10 E 1.402 5036.09 17 August, 2004 - 10:12 Page 3 of5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 Your Ref: API 500292321261 Job No. AKZZ3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 8156.21 92.220 282.950 3834.16 3902.51 697.38 N 5036.70 W 6010101.67 N 546748.15 E 1.953 5084.05 8206.13 91.910 282.440 3832.37 3900.72 708.34 N 5085.36 W 6010112.30 N 546699.41 E 1.195 5133.83 8252.69 92.470 282.050 3830.59 3898.94 718.21 N 5130.83 W 6010121.85 N 546653.88 E 1 .465 5180.27 8303.72 91.970 281.790 3828.61 3896.96 728.74 N 5180.72 W 6010132.04 N 546603.91 E 1.104 5231.19 8348.10 91.300 280.480 3827.34 3895.69 737.31 N 5224.25 W 6010140.30 N 546560.33 E 3.314 5275.51 e 8392.70 92.960 281.890 3825.69 3894.04 745.95 N 5267.97 W 6010148.64 N 546516.55 E 4.882 5320.04 8442.97 93.150 282.260 3823.01 3891.36 756.45 N 5317.06 W 6010158.80 N 546467.39 E 0.826 5370.16 8492.15 90.680 283.090 3821.36 3889.71 767.24 N 5365.01 W 6010169.25 N 546419.36 E 5.298 5419.19 8538.72 91.110 283.900 3820.64 3888.99 778.10 N 5410.29 W 6010179.80 N 546374.01 E 1.969 5465.60 8588.84 91.550 284.200 3819.47 3887.82 790.27 N 5458.89 W 6010191.63 N 546325.32 E 1.062 5515.50 8635.05 91.670 285.120 3818.17 3886.52 801.96 N 5503.58 W 6010203.01 N 546280.55 E 2.007 5561.46 8684.60 90.990 284.570 3817.02 3885.37 814.65 N 5551.46 W 6010215.37 N 546232.58 E 1.765 5610.72 8730.44 90.120 283.880 3816.58 3884.93 825.91 N 5595.89 W 6010226.32 N 546188.08 E 2.422 5656.35 8775.81 89.750 283.660 3816.63 3884.98 836.71 N 5639.96 W 6010236.82 N 546143.94 E 0.949 5701.55 8826.21 88.950 283.440 3817.20 3885.55 848.52 N 5688.95 W 6010248.28 N 546094.86 E 1.646 5751.78 8876.14 89.070 284.490 3818.07 3886.42 860.57 N 5737.40 W 6010259.99 N 546046.33 E 2.116 5801.50 8923.01 91 .480 286.520 3817.84 3886.19 873.09 N 5782.56 W 6010272.21 N 546001.09 E 6.723 5848.05 8972.16 91.050 287.010 3816.76 3885.11 887.27 N 5829.61 W 6010286.05 N 545953.94 E 1.326 5896.71 9019.55 90.370 286.370 3816.17 3884.52 900.88 N 5875.00 W 6010299.35 N 545908.46 E 1.970 5943.65 9068.73 92.350 285.290 3815.00 3883.35 914.29 N 5922.30 W 6010312.43 N 545861.07 E 4.586 5992.45 9115.27 95.630 284.140 3811.76 3880.11 926.08 N 5967.19 W 6010323.91 N 545816.09 E 7.466 6038.63 9155.12 97.300 284.180 3807.28 3875.63 935.77 N 6005.58 W 6010333.33 N 545777.63 E 4.192 6078.05 It 9226.00 97.300 284.180 3798.27 3866.62 952.99 N 6073.75 W 6010350.08 N 545709.35 E 0.000 6148.05 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9226.00ft., The Bottom Hole Displacement is 6148.06ft., in the Direction of 278.917° (True). 17 August, 2004 - 10:12 Page 4 of 5 DrillQuest 3.03.06.006 Milne Point Unit Comments Measured Depth (ft) 4791.87 4840.00 9226.00 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 Your Ref: API 500292321261 Job No. AKZZ3171003, Surveyed: 29 July, 2004 BPXA Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 3870.81 3887.14 3866.62 Comment 41.59 N 54.09 N 952.99 N 1747.17 W 1790.69 W 6073.75 W Tie On Point Window Point Projected Survey e Survey tool program for MPI-17L2 From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 17 August, 2004 - 10:12 0.00 449.96 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 9226.00 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17) 3866.62 AK-6 BP JFR-AK - MWD-IIFR-MS (MPI-17) e Page 50f5 DrillQuest 3.03.06.006 e e AOGCC ì RuLíl) Deä::¡OII 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 RECE.\\JED S£P 0 ~~ ZQ04 þlØ/lf.rJit.=f;¡ØIiIIIØ' 17 -Aug-04 Re: Distribution of Survey Data for Well MPI-17 L2 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 4,791.87' MD 4,840.00' MD 9,226.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 -?7Ý Date 1(9:!~ ¡ Signe~ Q~ . Please call me at 273-3545 if you have any que i s or concerns. Regards, .tJ~ William T. Allen Survey Manager Attachment(s) ;+f! '~ftJIif!Þ ILCv·fY Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPI MPI-17L2 MWD e Job No. AKMW3171003, Surveyed: 29 July, 2004 Survey Report 17 August, 2004 Your Ref: API 500292321261 Surface Coordinates: 6009439.29 N, 551789.57 E (70· 26'11.5176" N, 149· 34' 39.9045" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 It Surface Coordinates relative to Project H Reference: 1009439.29 N, 51789.57 E (Grid) Surface Coordinates relative to Structure Reference: 350.50 S, 388.52 W (True) Kelly Bushing Elevation: 68.35ft above Mean Sea Level Kelly Bushing Elevation: 68.35ft above Project V Reference Kelly Bushing Elevation: 68.35ft above Structure Reference SpEr"'r"'Y-SUI'1 OFtfL.L^ING seRVices A Halliburton Company Survey Ref: svy1451 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 MWD Your Ref: API 500292321261 Job No. AKMW3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastin9s Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft) 4791.87 70.040 286.180 3802.48 3870.83 44.58 N 1745.99 W 6009471.75 N 550043.31 E 1732.14 Tie On Point ". 4840.00 70.300 285.540 3818.81 3887.16 - 56.96 N 1789.55 W 6009483.82 N 549999.67 E 1.363 1777.08 Window Point 4893.56 76.790 283.390 3833.97 3902.32 69.76 N 1839.26 W 6009496.28 N 549949.87 E 12.713 1828.17 4944.18 84.630 261.980 3842.23 3910.58 71.98 N 1888.82 W 6009498.15 N 549900.30 E 44.482 1877.48 4988.81 92.100 279.570 3843.52 3911.87 72.60 N 1933.22 W 6009498.46 N 549855.89 E 42.779 1921.45 e 5037.81 91.790 283.990 3841.85 3910.20 82.59 N 1981.15 W 6009508.12 N 549807.89 E 9.037 1970.35 5085.20 91.230 282.100 3840.60 3908.95 93.28 N 2027.30 W 6009518.49 N 549761.67 E 4.158 2017.59 5134.44 91.670 280.550 3839.36 3907.71 102.95 N 2075.56 W 6009527.82 N 549713.34 E 3.271 2066.77 5181.48 89.510 278.250 3838.87 3907.22 110.63N 2121.96W 6009535.18 N 549666.89 E 6.707 2113.80 5230.16 91.910 276.020 3838.27 3906.62 116.68 N 2170.26 W 6009540.89 N 549618.56 E 6.729 2162.44 5278.17 91.670 275.490 3836.77 3905.12 121.49N 2218.00 W 6009545.37 N 549570.78 E 1.211 2210.36 5325.50 91.420 274.930 3835.49 3903.84 125.78 N 2265.12 W 6009549.34 N 549523.63 E 1.295 2257.58 5373.13 90.680 272.330 3834.62 3902.97 128.80 N 2312.64 W 6009552.03 N 549476.09 E 5.675 2305.00 5421.98 89.320 274.800 3834.62 3902.97 131.84N 2361.39 W 6009554.73 N 549427.32 E 5.772 2353.64 5469.34 88.760 275.170 3835.41 3903.76 135.95 N 2408.56 W 6009558.51 N 549380.12 E 1.417 2400.89 5518.21 88.700 274.650 3836.50 3904.85 140.13 N 2457.24 W 6009562.36 N 549331.41 E 1.071 2449.63 5565.63 89.200 277.780 3837.37 3905.72 145.27 N 2504.37 W 6009567.16 N 549284.25 E 6.683 2496.99 5615.08 89.200 281.240 3838.06 3906.41 153.43 N 2553.13 W 6009574.99 N 549235.44 E 6.996 2546.42 5662.28 90.370 281.410 3838.23 3906.58 162.70 N 2599.41 W 6009583.94 N 549189.10 E 2.505 2593.57 5711.46 90.370 282.210 3837.92 3906.27 172.77 N 2647.54 W 6009593.67 N 549140.89 E 1.627 2642.69 5759.10 90.310 281.490 3837.63 3905.98 182.55 N 2694.17 W 6009603.13 N 549094.20 E 1.517 2690.26 5806.31 90.190 281.030 3837.43 3905.78 191.77 N 2740.47 W 6009612.02 N 549047.84 E 1.007 2737.43 e 5854.86 90.190 280.310 3837.27 3905.62 200.76 N 2788.18 W 6009620.68 N 549000.06 E 1 .483 2785.95 5901.90 90.120 279.700 3837.14 3905.49 208.93 N 2834.50 W 6009628.53 N 548953.68 E 1.305 2832.98 5950.83 90.000 278.700 3837.09 3905.44 216.75 N 2882.80 W 6009636.02 N 548905.33 E 2.058 2881.91 5999.61 90.120 280.510 3837.04 3905.39 224.89 N 2930.90 W 6009643.82 N 548857.18 E 3.719 2930.68 6046.69 90.190 280.620 3836.91 3905.26 233.52 N 2977.18 W 6009652.13 N 548810.84 E 0.277 2977.74 6095.47 89.810 279.950 3836.91 3905.26 242.23 N 3025.17 W 6009660.51 N 548762.79 E 1.579 3026.50 6142.03 91.300 281.690 3836.46 3904.81 250.97 N 3070.90 W 6009668.93 N 548717.00 E 4.920 3073.03 6191.78 90.990 281.840 3835.46 3903.81 261.11 N 3119.60W 6009678.74 N 548668.24 E 0.692 3122.71 6238.20 90.680 280.680 3834.79 3903.14 270.18 N 3165.12 W 6009687.48 N 548622.65 E 2.586 3169.08 6287.71 90.560 280.740 3834.25 3902.60 279.38 N 3213.76 W 6009696.34 N 548573.94 E 0.271 3218.56 6333.71 90.120 279.340 3833.98 3902..33 287.40 N 3259.06 W 6009704.05 N 548528.60 E 3.190 3264.55 6383.63 89.810 278.780 3834.01 3902.36 295.26 N 3308.35 W 6009711.57 N 548479.25 E 1.282 3314.47 6429.79 87.900 282.040 3834.93 3903.28 303.59 N 3353.74 W 6009719.59 N 548433.81 E 8.184 3360.59 17 August, 2004 - 10:16 Page 20f5 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 MWD Your Ref: API 500292321261 Job No. AKMW3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 6479.37 89.260 283.600 3836.16 3904.51 314.59 N 3402.06 W 6009730.25 N 548385.40 E 4.173 3410.03 6524.55 90.000 284.090 3836.45 3904.80 325.40 N 3445.93 W 6009740.76 N 548341 .46 E 1.964 3455.04 6574.30 89.880 283.660 3836.50 3904.85 337.33 N 3494.23 W 6009752.35 N 548293.09 E 0.897 3504.60 6620.25 89.690 283.210 3836.68 3905.03 348.01 N 3538.92 W 6009762.72 N 548248.32 E 1.063 3550.40 6670.61 89.200 282.800 3837.16 3905.51 359.34 N 3587.98 W 6009773.71 N 548199.18 E 1.269 3600.62 e 6716.33 90.740 283.100 3837.19 3905.54 369.59 N 3632.54 W 6009783.64 N 548154.55 E 3.432 3646.22 6768.69 90.620 283.160 3836.57 3904.92 381.48 N 3683.53 W 6009795.18 N 548103.48 E 0.256 3698.43 6812.15 90.250 283.120 3836.24 3904.59 391.36 N 3725.85 W 6009804.77 N 548061.09 E 0.856 3741.77 6861.96 89.630 281.480 3836.29 3904.64 401.97 N 3774.51 W 6009815.04 N 548012.36 E 3.520 3791.48 6908.49 89.140 280.120 3836.79 3905.14 410.69 N 3820.22 W 6009823.44 N 547966.59 E 3.107 3837.98 6956.48 88.890 280.550 3837.61 3905.96 419.30 N 3867.42 W 6009831.72 N 547919.33 E 1.036 3885.95 7004.47 88.830 282.980 3838.57 3906.92 429.08 N 3914.39 W 6009841.18 N 547872.30 E 5.064 3933.86 7053.39 88.090 284.600 3839.88 3908.23 440.74 N 3961.88 W 6009852.50 N 547824.73 E 3.640 3982.58 7100.78 87.780 284.180 3841.59 3909.94 452.50 N 4007.75 W 6009863.95 N 547778.77 E 1.101 4029.71 7149.68 88.760 284.490 3843.07 3911.42 464.61 N 4055.11 W 6009875.73 N 547731.33 E 2.102 4078.37 7196.36 89.510 284.520 3843.77 3912.12 476.30 N 4100.29 W 6009887.10 N 547686.07 E 1.608 4124.81 7245.18 90.060 284.900 3843.96 3912.31 488.69 N 4147.51 W 6009899.17 N 547638.76 E 1.369 4173.37 7291.97 89.940 284.650 3843.96 3912.31 500.63 N 4192.76 W 6009910.79 N 547593.44 E 0.593 4219.91 7340.95 89.810 283.950 3844.06 3912.41 512.72 N 4240.22 W 6009922.56 N 547545.89 E 1 .454 4268.67 7388.31 89.750 284.290 3844.24 3912.59 524.28 N 4286.15 W . 6009933.79 N 547499.89 E 0.729 4315.83 7437.42 90.120 283.680 3844.30 3912.65 536.15 N 4333.80 W 6009945.33 N 547452.15 E 1.453 4364.74 7482.31 90.000 282.500 3844.25 3912.60 546.31 N 4377.52 W 6009955.19 N 547408.36 E 2.642 4409.50 e 7532.17 90.190 282.550 3844.17 3912.52 557.12 N 4426.20 W 6009965.67 N 547359.61 E 0.394 4459.26 7578.12 90.120 282.090 3844.05 3912.40 566.93 N 4471.09 W 6009975.16 N 547314.65 E 1.013 4505.12 7636.79 89.810 280.420 3844.08 3912.43 578.38 N 4528.63 W 6009986.21 N 547257.03 E 2.895 4563.74 7674.44 90.490 282.610 3843.98 3912.33 585.90 N 4565.52 W 6009993.47 N 547220.09 E 6.091 4601.35 7722.68 91.050 283.350 3843.33 3911.68 596.73 N 4612.52 W 6010003.97 N 547173.02 E 1.924 4649.45 7771.01 90.620 282.730 3842.63 3910.98 607.63 N 4659.60 W 6010014.55 N 547125.86 E 1.561 4697.65 7819.68 90.930 283.230 3841.97 3910.32 618.56 N 4707.02 W 6010025.15 N 547078.37 E 1.209 4746.19 7867.38 90.800 282.860 3841.25 3909.60 629.33 N 4753.48 W 6010035.59 N 547031.83 E 0.822 4793.75 7915.99 91.670 283.850 3840.20 3908.55 640.55 N 4800.77 W 6010046.49 N 546984.47 E 2.711 4842.20 7963.38 91.290 282.900 3838.98 3907.33 651.51 N 4846.86 W 6010057.13 N 546938.31 E 2.158 4889.42 8012.18 90.800 282.210 3838.09 3906.44 662.12 N 4894.48 W 6010067.40 N 546890.61 E 1.734 4938.11 8059.44 91.730 283.400 3837.05 3905.40 672.59 N 4940.55 W 6010077.56 N 546844.46 E 3.195 4985.24 8108.11 91.300 283.030 3835.76 3904.11 683.71 N 4987.92 W 6010088.35 N 546797.02 E 1.165 5033.75 17 August, 2004 - 10:16 Page 3 of5 Dri/lQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for Milne Point MPI- MPI-17L2 MWD Your Ref: API 500292321261 Job No. AKMW3171003, Surveyed: 29 July, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 8156.21 92.220 283.110 3834.28 3902.63 694.58 N 5034.75 W 6010098.90 N 546750.12 E 1.920 5081.70 8206.13 91.910 282.510 3832.48 3900.83 705.65 N 5083.39 W 6010109.62 N 546701.40 E 1.352 5131.47 8252.69 92.470 282.370 3830.70 3899.05 715.67 N 5128.83 W 6010119.33 N 546655.90 E 1.240 5177.90 8303.72 91.970 281.950 3828.73 3897.08 726.41 N 5178.68 W 6010129.72 N 546605.97 E 1.279 5228.81 8348.10 91.300 280.810 3827.46 3895.81 735.16 N 5222.16 W 6010138.17 N 546562.43 E 2.979 5273.12 e 8392.70 92.960 282.160 3825.80 3894.15 744.04 N 5265.84 W 6010146.74 N 546518.69 E 4.796 5317.64 8442.97 93.150 282.660 3823.13 3891.48 754.82 N 5314.86 W 6010157.19 N 546469.59 E 1.063 5367.74 8492.15 90.680 283.520 3821.48 3889.83 765.95 N 5362.74 W 6010167.99 N 546421.64 E 5.318 5416.75 8538.72 91.110 284.200 3820.75 3889.10 777.11 N 5407.94 W 6010178.83 N 546376.36 E 1.727 5463.14 8588.84 91.550 284.410 3819.59 3887.94 789.49 N 5456.50 W 6010190.87 N 546327.72 E 0.973 5513.02 8635.05 91.670 285.510 3818.29 3886.64 801.41 N 5501.12 W 6010202.48 N 546283.02 E 2.394 5558.94 8684.60 90.990 284.830 3817.14 3885.49 814.38 N 5548.93 W 6010215.11 N 546235.12 E 1.941 5608.18 8730.44 90.120 284.300 3816.70 3885.05 825.90 N 5593.30 W 6010226.33 N 546190.67 E 2.222 5653.78 8775.81 89.750 283.820 3816.75 3885.10 836.93 N 5637.31 W 6010237.05 N 546146.59 E 1.336 5698.96 8826.21 88.950 283.670 3817.32 3885.67 848.90 N 5686.26 W 6010248.68 N 546097.55 E 1.615 5749.18 8876.14 89.070 284.740 3818.18 3886.53 861.15 N 5734.66 W 6010260.60 N 546049.07 E 2.156 5798.88 8923.01 91.480 286.840 3817.96 3886.31 873.90 N 5779.75 W 6010273.04 N 546003.89 E 6.820 5845.40 8972.16 91.050 287.330 3816.87 3885.22 888.34 N 5826.72 W 6010287.15 N 545956.82 E 1.326 5894.02 9019.55 90.370 286.730 3816.29 3884.64 902.22 N 5872.03 W 6010300.71 N 545911.42 E 1.914 5940.93 9068.73 92.350 285.670 3815.12 3883.47 915.93 N 5919.24 W 6010314.10 N 545864.11 E 4.566 5989.68 9115.27 95.630 284.530 3811.88 3880.23 928.03 N 5964.06 W 6010325.88 N 545819.21 E 7.459 6035.83 9155.12 97.300 284.600 3807.40 3875.75 937.98 N 6002.38 W 6010335.57 N 545780.82 E 4.194 6075.22 e v 9226.00 97.300 284.600 3798.39 3866.74 v 955.71 N 6070.41 W 6010352.82 N 545712.67 E 0.000 6145.17 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.830° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9226.0Oft., The Bottom Hole Displacement is 6145.18ft., in the Direction of 278.947° (True). 17 August, 2004 - 10:16 Page 4 of5 DrillQuest 3.03.06.006 Milne Point Unit Comments Measured Depth (ft) 4791.87 4840.00 9226.00 Halliburton Sperry-Sun Survey Report for Milne Point MPI - MPI-17L2 MWD Your Ref: API 500292321261 Job No. AKMW3171003, Surveyed: 29 July, 2004 BPXA Station Coordinates TVD Northings Eastings ~) ~) ~) 3870.83 3887.16 3866.74 Comment 44.58 N 56.96 N 955.71 N Tie On Point Window Point Projected Survey e 1745.99 W 1789.55 W 6070.41 W Survev tool prOQram for MPI-17L2 MWD From Measured Vertical Depth Depth (ft) (ft) 0.00 450.00 17 August, 2004 - 10:16 0.00 449.96 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 450.00 9226.00 449.96 Tolerable Gyro - CB-SS-Gyro (MPI-17 MWD) 3866.74 MWD Magnetic (MPI-17 MWD) e Page 50f5 DrillQuest 3.03.06.006 Legal Name: MPI-17 Common Name: MPI-17 7/14/2004 7/15/2004 7/18/2004 FIT FIT FIT 2,378.0 (ft) 2,378.0 (ft) 5,774.0 (ft) 2.339.0 (ft) 2.339.0 (ft) 3,867.0 (ft) 9.30 (ppg) 9.30 (ppg) 9.60 (ppg) 120 (psi) 170 (psi) 480 (psi) 1,250 (psi) 1,300 (psi) 2,408 (psi) 10.29 (ppg) 10.70 (ppg) 11.99 (ppg) . e Printed: 8/3/2004 9: 14:42 AM . . FRANK H. MURKOWSKI, GOVERNOR A.I,ASKA. ORAND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point MPI-17L2 BP Exploration (Alaska) Inc. Permit No: 204-100 Surface Location: 2323' NSL, 3581' WEL, SEC. 33, T13N, RlOE, UM Bottomhole Location: 3306' NSL, 4361' WEL, SEC. 32, T13N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to redrill the above development well. The permit is for a new wellbore segment of existing well MPU I -17, Permit No, 204-098, API No. 50-029-23212-00. Production should continue to be reported as a function of the original API number stated above. This permit to redrill does not exempt you fÌ'om obtaining additional permits or approvals required by law fÌ'om other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission witness any required test. Contact the Commission's petroleum field inspector at (907) 65 6 7 (pager). BY ORDER OF THE COMMISSION DATED this1:!1tay of June, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. o Drill III Redrill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2323' NSL, 3581' WEL, SEC. 33, T13N, R10E, UM / Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2376' NSL, 136' WEL, SEC. 32, T13N, R10E, UM .' June 30,2004 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3306' NSL, 4361' WEL, SEC. 32, T13N, R10E, UM ,/ 2560 2030' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: x-551790" y-6009440 ,I Zone-ASP4 (Height above GL): Plan 69 feet MPI-10 is 1050' away .16·~~cV~~~~~:~IS: 4865~ Maximum HOI:}n~I:4~ 17. ~;~~~~:An~~~;~~:~essures in PSi~~~:~:O ~~5;5Y~~~ 18.C(lsing.PrqgralTl Spe¿ifications ...... .......> . . . S~tting D~pth\.... .... .\< .... .Quanti!yof9~m7P....·~· Size . . · '. TOP .' .. . .... ... ...... ..' .... .. Bottom" . . .' ...... . (c. f;Qr sacks) Casinç¡ Weiç¡ht Grade Couplinç¡ Length MD TVD MD TVD (includinç¡ staç¡e data) 4-1/2" 12.6# L-80 BTC 4340' 4750' 3899' 9205' 3879' Uncemented Slotted Liner .. STATE OF ALASKA I ALAS~IL AND GAS CONSERVATION CO MISSION PERMIT TO DRILL 20 MC 25.005 1b. Current Well Class 0 Exploratory o Stratigraphic Test 0 Service 5. Bond: 181 Blanket 0 Single Well Bond No. 2S100302630-277 6. Proposed Depth: MD 9205' " TVD 3879' 7. Property Designation: ADL 025517 k ft <'( JUN n:J ¿UU4 III Development Oil 0 Multipl~,Zone o De!fe!?~mant~slJ êiPSle f'Åìiïi . <;",. 11.:Wé¡¡'N~~~ ~'M~r: MÞI~17L2 ,¡ 12. Field I Pool(s): Milne Point Unit I Schrader Bluff Hole 6-3/4" . PRESENT WELL CONDlnONSI,jMMARY(To be completed for Redrill AND Re..entryQperations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD 9237 3734' None 9237 3734 Structural Conductor 80' 20" 260 sx Arctic Set (Approx.) 114' 114' Surface 2320' 10-3/4" 417 sx AS Lite, 273 sx Class 'G' 2350' 2319' Intermediate 5950' 7-5/8" 762 sx Class 'G' 5980' 3880' Production Liner 3962' 4"x5" Screen Assembly 5275' - 9237' 3989' - 3734' Liner 4090' 4-1/2" Uncemented Slotted Liner 5015' - 9215' 3944' - 3954' 20. Attachments 0 $100 Filing Fee 0 BOP Sketch 181 Property Plat 0 Diverter Sketch perfOration Depth TVD (ft): None 181 Drilling Program 0 Time vs Depth Plot o Seabed Report 181 Drilling Fluid Program o Shallow Hazard Analysis 18120 MC 25.050 Requirements Date: Contact Skip Coyner, 564-4395 Perforation Depth MD (ft): None 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Pat Archey Title Senior Drilling Engineer Phone Prepared By Name/Number: Terrie Hubble, 564-4628 Permit To Drill . . Number: 2L)t.¡-ICô 50- C.':>Z-9 - Z- '32/ 2... -~, / Conditions of Approval: Samples Required 0 Yes gNo Hydro en Sulfide Measures 0 Yes ~No Other: st)aa ~-;\ ' t'"\.\~""'Ü\¡"-'\.. ~\?>~s*- Permit AIoval 'I Date: aa, fD Mud Log equired Directional Survey Required See cover letter for other requirements DYes ßJ No ~es 0 No -- ORIGtN,l\L BY ORDER OF THE COMMISSION Date ~i1::: . . - bp IWell Name: IMPI-17 L2 OA Lateral Drill and Complete Plan Summary I Type of Well (service I producer I injector): 1 Schrader Bluff Tri-Lateral Producer Suñace Location: 2,323' FSL, 3,581' FEL, SEC. 33, T13N, R10E (As Staked) E = 551,790' N = 6,009,440' Target location: 2,720' FSl, 1,610' FEl, SEC. 32, T13N, R10E Top NB E = 548,477' N = 6,009,814' Z = 3,779' TVD Target Location: 3,306' FSl, 4,361' FEL, SEC. 32, T13N, R10E BHL NB lateral E = 545,721' N = 6,010,382' Z = 3,954' TVD . Target location: 2,452' FSL, 374' FEl, SEC. 32, T13N, R10E Top OB E = 549,716' N = 6,009,554' Z = 3,969' TVD Target location: 3,306' FSl, 4,361' FEl, SEC. 32, T13N, R10E _ R~(O~,215~:= 545 721' , N = 6,010,382' .7 7 3.954' nIt) _ r Target Location: 2-;376' FSL, L.f-36' FEL, SEC. 32 , T13N, R10E ,/ ~ / Top OA E = 549,955' N = 6,009,480' Z = 3,899' TVD I \. Target Location: 3,306' FSL, 4,361' FEL, SEC. 32, T13N, R10E ,/ J ) BHL L2 (OA) 9,205' E = 545.721' N = 6.010,382' Z = 3.8~9' ~ C-- Diätance to t'roperty line 2030' ~ - Distance to nearest pool 1050' from MPI-10 I AFE Number: 1 I . Estimated Start Date: 110 June 04 I Ria: 1 Doyon 14 Rig days to complete: 121 MD: 19205' I I TVD: 13899' I I Max Inc: 1910 I 1 KOP: 14865' I I KBE: 169 Well Design (conventional, slimhole, etc.): 1 Tri-Lateral Producer Objective: 1 Schrader Bluff NB, OB & OA 1 . Mud Program: 13-1/2" Surface Hole (0 - 2350'): fDensity(ppg)l PV 'I"" YP 9.0-9.3 10-20, 25-30 9-7/8" Intermediate Hole (2350 - 5980'): I Density (Ppg) i' ,PV· I· " VP 9.4-9.6 10-20 25-30 6-3/4" NB Production Hole (5980 - 9237'): I Density (ppg) 1 ' PV . ./. YP . 9.4-9.6 10-20 25-30 . LSND 1~~~ 9.0P~ 9.5 1 API ~I:at~ ILG ~~~ds LSND 1~~~ ·1 9.0P~9.5 1 API ~I~rate II..G ~~dS MOBM ~T~~ 1 9.0P~9.5 1 API ~':ate· rLG ~':S> 6-3/4" OB Production Hole (5125- 9215'): MOBM Density ~ PV YP HTHP pH API Filtrate \LG Solids / ~-.-9,.~~-2Q...:---:2¿-~ 10-1,~0-9.5,- <6 <15 ì _ 6-3/4" OA Production Hole (4865 - 9205'): MOBM-l ~~~ 10~ 25~O 1~f1~O~9.5IØI~~ M3~~I/ ) lCM Restrictions: No Organic LCM products in the Schrader Bluff f~ .- -------' Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. (~men~røgnfm:-------------- _.~----------------~-- CasinQ Size 10-3/4",45.5#, L-80, BTC Surface Casing at 2,350' MD ~ Basis Ы:ess \'tom BlPermafrost to Surface = 175% o.ver g¡¡uge IIole. Use 40% excess below the B/Permafrost. Tail cement = 500' MD. Total Cement 10 bbl water Volume: 387 bbl Wash 25 bbl CW 100 Spacer 75 bbl of MudPush Lead 330 bbl, 417 sx of Arctic Set Lite: 10.7 ppg and 4.44 fe/sx Tail 57 bbl, 273 sx "G" mixed at 15.8 Ib/gal & 1.17 ft"/sx . Temp Casing Point BHST 450 F (estimated by Dowell) 7-518",29.7#, L-80, BTC-M Intermediate Casing at 5,980' MD Top of cement to be 500' MD above Ugnu sands: 40% excess. Shoe Joint = 85 ft. 5-bbl water Wash 25 bbl PW 100 Spacer 40 bbl of MudPush Tail 158 bbl, 762 sx UGH mixed at 15.8 Ib/gal & 1.16 ft3/sx Temp BHST ==80°F from SOR ------ Casing Size Basis Total Cement ~olume: 158 bbl \ ."'-.. \ ----"' --------.- ~ ....... "---'. L<:J.c;\ "\. "'-> ~*,. \ ~~.. \¡""".Z,:\.-\---GÆ·· \:'D(((: ( k ~ .L- \'"( 2 . Evaluation Program: 13-1/2" Section Open Hole: Cased Hole: MWD/GR IFRlCASANDRA Sperry InSite N/A 9-7/8" Section Open Hole: MWDIGRlRES IFRlCASANDRA Sperry InSite Cased Hole: N/A 6-3/4" Section Open Hole: MWD/GRlRES/ABI IFRlCASANDRA Sperry InSite Cased Hole: N/A . Formation Markers: Formation Tops MD rvD (ft) Pore Pressure (ft) (psi) BPRF 1,809 1,789 TUZC 3,600 3,294 1400 Ugnu-MA 3,982 3,522 1499 Uqnu-MB1 4,000 3,533 1504 Ugnu-MB2 4,071 3,575 1522 Uønu-YC 4,310 3,700 1577· SBF2-NA 4,421 3,746 1768 SBF1-NB 4,468 3,763 1776 SBE4-NC 4,561 3,795 1791 SBE2-NE 4,617 3,814 1800 .......,. S~='CMN.. "' ~760 ~63 1R?,4 <¿- TSBD-Top OA 4,877 3,9o:r 1843 ( TSBC-Base OA 4.984 3,936 1859 T§.p~ T ()~ On.....---- 5,12Š'- 3,969 1~/S """"'- SBAS-Base OB 5,248 3,987 1884 TSBB-Top OB Upgo;ng 5,730 3,954 1868 TSBC-Base OA Upgo;ng 5,850 3,919 1851 TSBD-Top OA Upgo;ng 5,970 3,882 1833 SBEI-NFUpgo;ng 6,110 3,842 1814 SBE2-NE Upgo;ng 6,295 3,796 1792 SBE4-NC Upgo;ng 6,420 3,779 1783 SBF12-Base NB Sand Upgo;ng 6,565 3,771 1779 NB owe 4,163 OA owe 4,189 OBowe 4,167 3 EMW (Ib/gal)* 8.2 8.2 8.2 8.2 8.2 9.1 9,1 9.1 9.1 " 9.1 9.1 9.1 1.1: ~ ~ 9.1 ;> .-' 9.1 9.1 9.1 9.1 9.1 9.1 9.1 >/' . CasinglTubing Program Hole Size ··Csgl Wt/Ft···· Grade Tbg O.D. 42-in 20-in* 92# 13.5 in 10.75-in 45.5# 9.875 in7.625-in 29.7# 6.75 in 4" X 5" Screens L-80 4" IBT NB and 4" Blanks 6.75 in 4.5-in 126# L-80 /\ OB Slotted . 76.7~ 4~~ '--- OA Slotted 12.6# L-80 ~~ Recommended Bit Program: BHA .. Hole. Size Depth (MD) Footage 1 13.50 in Surf - 2,350' 2,320' 2 9.875 in 2,350' - 5,980' 3,630' 3NB 6.750 in 5,980' - 9,237' 3,257' 30B 6.750 in 5,125' - 9,215' 4,090' 30A 6.750 in 4,865' - 9,205' 4,340' Well Control: Intermediate/Production hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity tests: Kick tolerance: · Planned completion fluid: H-40 Welded l-80 . BTC-M L-80 BTC-M BTC \..- BTC '- . . Bòtto MDI 80' 34' 114'/114' 2,320' 30' 2,350' /2,319' 5,950' 30' 5,980' 1 3,880' 3,962' 5,275' 13,989' 9,237' 13,734' 4,090' 5,015' /3,944' 9,215' 13,954' ------, ~ '~. ~ , 4,340' 4,750' / 3,899' 9,205' / 3,879' ( / ~ L--r~ Bit Type . MXC1 PDC PDC PDC PDC ..·.TEA. .85 - 1.0 .60 - .85 .35 - .50 .35 - .50 .35 - .50 ···GPM. 450 - 650 500 - 600 275 - 325 275 - 325 275 - 325 ~'\\\ ~~ 1,843 psi at 3,903' TVD (Top of the OA sand) v 1,453 psi at surface (Based on a full column of gas at 0.1 psi/ft) ./ 3,000 psi FIT to 12.0 Ib/gaI20' below the 10-3/4" shoe. 38-bbl with 9.3 Ib/gal mud at below the 10-3/4" shoe. MOBM in Laterals with 9.8 ppg Brine and Diesel above. Drilling Hazards & Contingencies: . Hydrates have been encountered on I-Pad wells between 1,700' and 2,300' TVD. · Tight hole and packing off due to clays and poor hole cleaning has occurred on I Pad wells. . Sloughing / caving coal beds have been encountered on I Pad. · Over-Pressured sands have been encountered on I Pad due to offset injection wells. ( 4 Lost Circulation · We do not expect losses while drilling this well. · Offset wells have not reported losses while drilling. However if seepage and/or losses occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. . . Expected Pressures · The Schrader Bluff sands were over-pressured from offset injection wells while drilling 1-12 & 1- ;/ 13. That situation has since been rectified. Pad Data Sheet · Please Read the I-Pad Data Sheet thoroughly. Breathing . Not expected or predicted. Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Faults · Four faults are mapped that intersect the "OA" lateral: one at ± 5360' MD, one at ± 6560' MD, v/ one at ± 8,040' MD, and the final fault at ± 8640' MD. Hydrogen Sulfide · MPI Pad is not designated as an H2S Pad. ./ Anti-collision Issues · The only anti-collision issue for the OB lateral is its proximity to the main wellbore and to the NB lateral. Distance to Nearest Property · MPI-17 is 2,030 ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPI-17 is 1,050 ft from the nearest Schrader Bluff NB sand penetration in MPI-10. ./ 5 · . DRILL & COMPLETION PROCEDURE Pre-Ria Operations 1. The 20" conductor will be installed pre-rig. Drillina o 'o""o"''''''¡¡¡:KaÀI'~~~I!Mi.'~_~ ,_-~':~;i~l:.gj'; ,'_~¡~1!h_~~..B\_ 1,,"J¡""~\;~óìi\~.'::'\:Îf_.")IId¡e&IJ! ··fII13'¡.t:_r:~:~ Iff~~i.Rdif,nð;~~1S-~~Jii((ij1 "\\\H"~\"IDo·¡¡,ii{;.¡.;..!.ío_..\j~ t'";.,¡.....~NI"i__~iillììa _~;;~y~t~yiil~w~t. _' ~'.__,~_.~&~,'''I'''_.i~__,' ..1\...... 11~~\I:\%1\:J:j~\~:r!~lIli.~...i 'U.\F o\\j\\n..ai*&¡\/tiIAø ~\""~;.;r~~'I;";",,,,"4Y:~~,t~ ð\\~1 ,---.;:t*_.~i~š:17~\*I-:!!~~.'r:~~"._j:-_I¡I_~¡{~1:5~_ -~-- ',', --~--":~ it ~\i"\lil\ 11itn'4;'~'Miið'~^" il;:.~~~'*I%I\tl'i0,;~~:-_-_ -. '- .'I.'-<-,_jiôllll1\IaB~ _\i\\"j\IfI1f'!t:'~';'" À~~~¡¡í¡¡~n'~~\'Dit~.~_~ R4~:¿:-~:~¡~}~~-~~¡..ï~Bt;~_.UiWf"~-\\/':::::,)\__,_,,:~:__~;;~n~~~~k::~::~~.'lt_.~\iill.di..à~j'I,¡¡2"'~_ 14. Run whipstock and mill window for OA lateral. 15. Drill 6-3/4" OA horizontal production hole. 16. Retrieve whipstock. 17. Run 4.5" slotted liner and hang off in 7.625" casing 18. Displace MOBM with Brine 19. RU and Run 2.875" ESP Completion. 20. ND BOP/NU Tree 21. Freeze Protect. 22. RDMO Doyon 14. 6 . "CO ~D: \j ~ ~.YJ-<~~ fl ~œ~ " '~~1 o~ . ('ID íì,Ct ¥ ~.~ 0 '\);~ ' !>' ~'~~ '" .0 I).. \. . "/I ,<j H-P ~~ ~ \) 1) . '\o~~ ~~~I\ ~ .c ß~ /" (i]";(ì \ , ASP GRID - Z 2'34'41" , I-PAD PLANT ÇT1: - -1 - - A -- Á- -r- - -C -"1l I I ¡-< 1 I 1 f.< I I ¡< I I k I 1 I r I I f-< I I 1--< I I I f-< I I I r I 1 k I 1 I ¡< 1 I r ¡ i k i I I >-I I I J 1 I >-i I I I I I I >-I I I J I I I >-¡ I I >-i I 1 I I 1 I >-i I I J I I 1 I >-j : >-: : >i : , , , >-< : ,_ __'1.._ _ _ _ y _ _ _ __'1..__ _ _ 'L _ __ _ '( _ ___ __'I.. j: .14 .13 .12 .11 · 8 · 7 .4 .6 · 3 · 5 · 2 · 9 .1 MAP N.T.S. LEGEND + AS-STAKED CONDUCTOR . EXISTING CONDUCTOR o EXISTING AS-STAKED CONDUCTOR LOCATION .10 .15 +1-16 +1-17 018 019 NOTES 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, ALASKA, NAD 27. 2. PAD SCALE FACTOR IS 0.9999031 3. HORIZONTAL & VERTICAL CONTROL IS BASED ON MPU I-PAD MONUMENTS 1-1 AND 1-2. 4. DATE OF SURVEY: MAY 9, 2004. 5. REFERENCE FIELD BOOK: MP04-03 PAGES 58-59. MPU I-PAD ../ LOCA TED WITHIN PROTRACTED SEC. 33, T. 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.s.P. PLANT GEODETIC GEODETIC PAD SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS I 16 Y= 6,009,440.87 N 1,120.00 70'26'11.535" 70.4365375' 34.7' 2,324' FSL - X= 551,759.58 E 1,465.00 149'34'40.784" 149.5779956' 3,611' FEL Y= 6,009,439.52 N 1,120.00 70'26'11.520" 70.4365333' 34.7' 2,323' FSL ../ 1-17 X= 551,789.55 E 1,495.00 149'34'39.905" 149.5777514' 3,581' FEL ,/ ~ ~ o 5/10/04 ISSUEO FOR INFORMATION NO. DATE REVISION ~œ~~' ORAINN: ObP JACOBS CHECKED: ALLISON DATE: 5/10/04 DRAWING: MILNE POINT UNIT I-PAD SHEET: FRB04 MPI 02-00 ~ åJ~~[I]œo JOB NO: SCALE: AS-STAKED CONDUCTORS EHGINEERSAHOLN«ISURYEVORS 1 OF 1 JJ RFA 1101 WEST F11iE'IIEED I.H4E 1'=150' WELLS MPI-16 & MPI-17 BY CHK ANCHORAGE. ALASKA 9t5OJ L1 "08" Lateral j l 10-3/4",40.5#, L-80, BTC at 2350' MD MPI...1 Inverted Tri-lateral NB, OA & OB 2·7/8" Tubing & ESP 7·5/8" Baker HGR & UP TOL == 4750' MD NB Sand: . 3780' TVD MD 7 -5If3" Shoe set 5890' MD ____1IIIIIIiIØ - __.._:!IIII!IIIIIi!._ --_._- S COMP!~.NY DETAILS REFERENCE fNFORMA nON SURVEY PROGRAM Plan: MPI-I7 L2WP03 (Plan MPi-17 Thor/Plan MP1-17 L2) BPA!Uù{:o IÂ--pth Fro Depth To SutV~.'YjpJan 4865.00 9205.13 Planned: MPI-!7 L2 WP03 V20 Tool Created By: Troy Jakabosky Checked: Date: 4/17/2004 MWD+IFR+MS Date 6930 Revíewed: Date- WELL DETAILS " #, , -,§> ~ ,- ~ TARGET DETAILS N""" +NI-S +Ef·W Northing &sting Latitude Longitude Slot N",,,, TV]) +N/-S +Ei¥W Northing F.1Isting Simp' Plan MPJ-!7 Thor J04U9 155Û.92 600943952 551789.55 70"26'11520N J49"34'39.905W NiA 6010084.00 6010496.00 SECTION DETAILS 6010495.00 60IOnS.GO See MD Inc Azi TVD +NI-S +EI-W DLeg TFace VSec Target 6009540.00 6009690.00 60Jü340.01 1 4865.00 70.00 285.00 3899.12 40.85 -1834.80 0.00 0.00 1819.33 6009807.00 2 4885.00 70.23 287.54 3905.92 46.12 -1852.86 12.00 85.00 1837.98 6011003.01 6009960.00 3 5082.60 93.92 286.70 3932.97 103.27 -2038.58 12.00 -2.10 2030.27 6010906.01 4 5667.27 93.92 286.70 3892.96 270.85 -2597.29 0.00 0.00 2608.08 6010101.00 5 5774.12 90.00 285.00 3889.30 300.00 -2700.00 4.00 -156.61 2714.05 6 5929.57 90.16 278.78 3889.09 332.02 -2852.03 4.00 -88.55 2869.20 7 6210.58 90.16 278. 78 3888.32 374.93 -3129.75 0.00 0.00 3150.21 FORMATION TOP DETAILS 8 6294.42 88.50 281.70 3889.30 389.83 -3212.23 4.00 119.62 3234.00 MPl-17 L2 T1.2 9 6354.65 88.39 279.29 3890.94 400.80 -3271.43 4.00 -92.73 3294.18 No. TVDPath MDPath Formation 10 7167.46 88.39 279.29 3913.82 532.00 -4073.26 0.00 0.00 4106.65 11 7262.09 91.03 282.00 3914.30 549.48 -4166.24 4.00 45.68 4201.21 MP1-17 L2 T2.2 3903.30 4877.27 TSBD-Top OA 12 7270.13 91.03 281.68 3914.16 551.13 -4174.11 4.00 -90.00 4209.24 13 ~9205.13 91.03 281.68 3879.30 942.74 -6068.74 0.00 0.00 6141.53 MP1-17 L2 T3.2 CASING DETA1LS No. TVD MD Name Size 3879.30 9205.00 41/2" 4 .500 4500- ¡. r ! i i I I ! !71efr ! i i i , , i i ' sjj¡rt i i .. ~ï ... J ......... E¡;d¡U' ..... .... im i i ..... - . i i i i i ,-. ::1 w' 'w j · J Ii ill .... · ..... ,.a - .... - ....... ...... - ..... i' i I - i····· - i i "i"" i 1 i i i i i';l '=i i .... \-'Ä " "I , .~ II · ..... , I I I I · ..... i ;: · .... I - ¡ i I I ...... ~ ~ -...""~ · I I I I i. I I I , i I i - i : iI Ii : i i I ,i : : Ii: i , I : : ; ; , Iii i i :610: : : : , , , , , , , , , I ! ! j ¡ j ! I j I ¡ , , I ' , , , , , , , , , 500 2000 2500 3000 3500 4000 4500 5000 5500 3000-- 3500- <i" ;¡¡¡ '" '" ~ .¡¡ IT Q " .~ 4000- > ~ Vertical Section at 278.83" [500ft/in] . . Proposal Ref: pro1424 Halliburton Sperry-Sun ~ MP . ~v;æ Jun., 200. \roposal Report 11 June, 2004 Surface Coordinates: 6009439.52 N, 551789.55 E (70026' 11.5199" N, 149034' 39.9051" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 69.30ft above Mean Sea Level --=-- .. .y--..., DR'.......... IiIlllftVICIIISI Å HllIIIII»uriM ~ Halliburton Sperry-Sun Proposal Report for MPI-17 L2 Wp 3.0 Revised: 11 June, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Ea Comment (ft) (ft) ~. (ft) (ft) (ft) (ft) ..t.:'- . ,', ...."'~..~-~..-, 4865.00 70.000 285.000 3829.85 ~/; 40.89 N 1819.30 Tied on at 4865.00ft 4885.00 70.230 287.540 3836.66 46.15 N 11.998 1837.95 Continue BuildfTurn at 4885.00ft 4900.00 72.028 287.471 3841.51 3910.81 50.42 N 11.996 1851.98 5000.00 84.017 287.040 3862.22 3931.52 79.38 N 11.996 1948.57 End of BuildfTurn at 5082. 60ft . 5082.60 93.920 286.700 3863.71 3933.01 103.32 N 11.996 2030.24 5100.00 93.920 286.700 3862.52 3931.82 .55N 549733.67 E 0.000 2047.44 5200.00 93.920 286.700 3855.68 3924.98 1.56N 549637.92 E 0.000 2146.27 5300.00 93.920 286.700 3848.85 3918.15 9.56N 549542.1 6 E 0.000 2245.09 5400.00 93.920 286.700 3842.01 3911.31 617.57 N 549446.41 E 0.000 2343.92 5500.00 93.920 286.700 3835.17 3904.47 6009645.57 N 549350.65 E 0.000 2442.75 5600.00 93.920 286.700 2532.97 W 6009673.57 N 549254.90 E 0.000 2541.57 5667.27 93.920 286.700 2597.25 W 6009692.41 N 549190.48 E 0.000 2608.05 Start DropfTurn at 5667. 27ft 5700.00 92.719 286.178 2628.59 W 6009701.44 N 549159.08 E 3.998 2640.44 5774.12 90.000 285.000 2699.95 W 6009720.86 N 549087.58 E 3.998 2714.02 Start BuildfTurn at 577 4.12ft 5800.00 90.027 283.964 2725.01 W 6009727.15 N 549062.48 E 4.003 2739.77 5900.00 327.29 N 2822.82 W 6009747.20 N 548964.53 E 4.003 2839.60 5929.57 332.10 N 2851.99 W 6009751.81 N 548935.32 E 4.003 2869.17 End of BuildfTurn at 5929. 57ft 6000.00 342.86 N 2921.60 W 6009762.08 N 548865.64 E 0.000 2939.60 6100.00 358.12 N 3020.42 W 6009776.66 N 548766.71 E 0.000 3039.60 6200.00 373.38 N 3119.25 W 6009791.23 N 548667.78 E 0.000 3139.60 6210.58 3819.08 3888.38 375.00 N 3129.71 W 6009792.78 N 548657.31 E 0.000 3150.18 StartDropfTurn at 621 0.58ft 6294.42 3820.06 3889.36 389.90 N 3212.1 9 W 6009807.10 N 548574.73 E 4.006 3233.97 Continue DropfTurn at 6294.42f. 6300.00 3820.21 3889.51 391.02 N 3217.66 W 6009808.19 N 548569.25 E 4.004 3239.55 6354.65 3821 .70 3891.00 400.87 N 3271.39 W 6009817.66 N 54851 5.45 E 4.004 3294.15 End of DropfTurn at 6354. 65ft 6400.00 3822.97 3892.27 408.18 N 3316.1 3 W 6009824.67 N 548470.67 E 0.000 3339.48 6500.00 88.390 279.290 3825.78 3895.08 424.32 N 3414.78 W 6009840.12 N 548371.91 E 0.000 3439.44 6600.00 88.390 279.290 3828.59 3897.89 440.46 N 3513.43 W 6009855.57 N 548273.15 E 0.000 3539.40 6700.00 88.390 279.290 3831.40 3900.70 456.59 N 3612.08 W 6009871.02 N 548174.39 E 0.000 3639.35 6800.00 88.390 279.290 3834.21 3903.51 472. 73 N 3710.73 W 6009886.47 N 548075.63 E 0.000 3739.31 6900.00 88.390 279.290 3837.02 3906.32 488.87 N 3809.38 W 6009901.92 N 547976.87 E 0.000 3839.27 7000.00 88.390 279.290 3839.83 3909.1 3 505.00 N 3908.03 W 6009917.37 N 547878.11 E 0.000 3939.23 7100.00 88.390 279.290 3842.64 3911.94 521.14 N 4006.67 W 6009932.83 N 547779.35 E 0.000 4039.18 7167.46 88.390 279.290 3844.53 3913.83 532.03 N 4073.22 W 6009943.25 N 547712.73 E 0.000 4106.61 Start BuildfTurn at 7167.46ft 7200.00 89.298 280.222 3845.1 9 3914.49 537.54 N 4105.29 W 6009948.54 N 547680.63 E 3.998 4139.14 7262.09 91.030 282.000 3845.01 3914.31 549.50 N 4166.21 W 6009960.08 N 547619.63 E 3.998 4201 .18 Start Turn at 7262.09ft 11 June, 2004 - 8:37 Page 20f4 DrillQuest 3.03.06.002 Milne Point Unit Measured True Depth Incl. Azim. (ft) 7270.13 91.030 281 .680 7300.00 91 .030 281.680 7400.00 91.030 281 .680 7500.00 91.030 281.680 7600.00 91.030 281.680 7700.00 91.030 281.680 7800.00 91 .030 281.680 7900.00 91.030 281.680 8000.00 91 .030 281.680 8100.00 91.030 281.680 8200.00 91.030 281.680 8300.00 91.030 281.680 8400.00 91.030 281.680 8500.00 91.030 281.680 8600.00 91 .030 281.680 8700.00 8800.00 8900.00 9000.00 9100.00 9200.00 9205.1 3 Sub-Sea Vertical Depth Depth (ft) (ft) 3844.87 391 4.17 3844.33 3913.63 3842.53 3911.83 3840.74 3910.04 3838.94 3908.24 3837.14 3906.44 3835.34 3904.64 3833.55 3902.85 3831.75 3901.05 3829.95 3899.25 381 0.18 3810.09 3879.48 3879.39 Halliburton Sperry-Sun Proposal Report for MPI-17 L2 Wp 3.0 Revised: 11 June, 2004 BPXA Local Coordinates Global Coordinates Northings Eastings Northings Ea Comment (ft) (ft) (ft) 551.15 N 4209.21 557.20 N 4239.03 577.44 N 4338.89 597.68 N 4438.76 617.92 N 4538.62 .76N 547190.25 E 0.000 4638.48 5.32N 547092.20 E 0.000 4738.34 4.88N 546994.15 E 0.000 4838.20 104.44 N 546896.1 0 E 0.000 4938.06 6010124.00 N 546798.05 E 0.000 5037.92 5084.54 W 6010143.56 N 546700.00 E 0.000 5137.78 5182.46 W 6010163.13 N 546601.94 E 0.000 5237.64 5280.37 W 6010182.69 N 546503.89 E 0.000 5337.50 5378.28 W 6010202.25 N 546405.84 E 0.000 5437.36 5476.20 W 6010221.81 N 546307.79 E 0.000 5537.22 840.58 N 5574.11 W 6010241.37 N 546209.74 E 0.000 5637.08 860.82 N 5672.02 W 601 0260.93 N 546111.69 E 0.000 5736.94 881.06 N 5769.94 W 601 0280.49 N 546013.63 E 0.000 5836.80 901.30 N 5867.85 W 6010300.05 N 545915.58 E 0.000 5936.66 921.54 N 5965.76 W 6010319.61 N 545817.53 E 0.000 6036.52 941.78 N 6063.68 W 6010339.17 N 545719.48 E 0.000 6136.38 942.82 N 6068.70 W 601 0340.18 N 545714.45 E 0.000 6141.50 Total Depth at 9205.13ft e e All data is in Feet Survey) unless otherVvise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Easüngs are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 278.831 0 (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 9205.13ft, The Bottom Hole Displacement is 6141.50ft, in the Direction of 278.831 0 (True). The Along Hole Displacement is 6498.73f!. The Total Accumulated Dogleg is 130.7480 The Planned Tortuosity is 2.364011 00f!. The Directional Difficulty Index is 6.0. 11 June, 2004 - 8:37 Page 3 0'4 DrillQuest 3.03.06.002 Milne Point Unit Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Halliburton Sperry-Sun Proposal Report for MPI-17 L2 Wp 3.0 Revised: 11 June, 2004 Comment 4865.00 3899.1 5 40.89 N 1834.77 W 4885.00 3905.96 46.15 N 1852.83 W 5082.60 3933.01 103.32 N 2038.55 W 5667.27 3893.04 270.94 N 2597.25 W 5774.12 3889.38 300.09 N 2699.95 W 5929.57 3889.17 332.1 0 N 2851. 6210.58 3888.38 plTurn at 621 0.58ft 6294.42 3889.36 tinue DroplTurn at 6294. 42ft 6354.65 3891.00 End of DroplTurn at 6354. 65ft 7167.46 3913.83 Start BuildlTurn at 7167.46ft 7262.09 3914.3 StartTum at 7262.09ft Total Depth at 9205.13ft 11 June, 2004 - 8:37 Page 4 of 4 BPXA e . Dril/Quest 3.03.06.002 · . Halliburton Company Anticollision Report GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 25.00 ft Depth Range: 69.30 to 9236.92 ft Maximum Radius: 1116.76 ft Reference: Error Model: Scan Method: Error Surface: Plan: MPI-17 wp12 & NOT PLANNED PROGRA ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Casing Points 2349.94 5980.00 9236.00 2319.30 3879.51 3734.34 10.750 7.625 4.500 13.500 9.875 6.125 103/4" 7 5/8" 5 1/2" [Plan: Principal: MPI-17 wp12 Date Composed: Version: Tied-to: 3/11/2004 145 From Well Ref. Point Yes Summary M pt H Pad Plan Trinity Trinity V1 Plan: Trini 4648.74 10750.00 335.87 267.60 68.27 Pass: Major Risk M pt Pad MPI-01 MPI-01 V1 1116.73 1150.00 49.47 31.11 18.35 Pass: Major Risk M pt Pad MPI-01 Plan MPI-01A VO Plan: 1117.15 1125.00 49.47 31.08 18.39 Pass: Major Risk M Pt Pad MPI-01 Plan MPI-01AL 1 VO Plan 1117.15 1125.00 49.47 31.17 18.30 Pass: Major Risk M pt Pad MPI-02 MPI-02 V1 986.29 1025.00 157.86 24.87 132.99 Pass: Major Risk MPt Pad MPI-03 MPI-03 V1 1395.39 1400.00 151.73 40.73 111.00 Pass: Major Risk Mpt Pad MPI-05 MPI-05 V1 1595.86 1625.00 192.72 31.08 161.64 Pass: Major Risk M pt Pad MPI-06 MPI-06 V10 677.89 675.00 268.04 15.01 253.02 Pass: Major Risk M pt Pad MPI-07 MPI-07 V1 845.77 850.00 321.95 25.40 296.55 Pass: Major Risk M pt Pad MPI-09 MPI-09 V12 626.82 625.00 139.97 11.88 128.09 Pass: Major Risk Mpt Pad MPI-10 MPI-10 V8 505.93 500.00 79.67 9.32 70.35 Pass: Major Risk M pt Pad MPI-10 MPI-10A V1 505.93 500.00 79.67 9.48 70.19 Pass: Major Risk M pt Pad MPI-12 MPI-12 V10 529.18 525.00 411.87 8.66 403.21 Pass: Major Risk MPt Pad MPI-12 MPI-12L 1 V11 529.18 525.00 411.87 8.55 403.31 Pass: Major Risk M pt Pad MPI-12 MPI-12PB1 V4 529.18 525.00 411.87 8.66 403.21 Pass: Major Risk M Pt Pad MPI-12 Plan MPI-12 A (Thor T 5997.65 4950.00 181.98 165.81 16.17 Pass: Major Risk M pt Pad MPI-13 MPI-13 V6 354.79 350.00 444.45 7.81 436.64 Pass: Major Risk MPt Pad MPI-15 MPI-15 V6 1074.74 1075.00 34.44 21.61 12.83 Pass: Major Risk M pt Pad MPI-15 MPI-15L 1 V2 1074.74 1075.00 34.44 21.40 13.04 Pass: Major Risk M Pt Pad MPI-15 MPI-15PB1 V5 1074.74 1075.00 34.44 21.66 12.78 Pass: Major Risk M pt Pad Plan MPI-14 Odin MPI-14 L 1 VO Plan: MPI 7667.15 6100.00 252.99 170.61 82.38 Pass: Major Risk MPt Pad Plan MPI-14 Odin Plan MPI-14 PB1 V10 PI 7667.15 6100.00 252.99 170.07 82.92 Pass: Major Risk M pt Pad Plan MPI-17 Thor Plan MPI-17 L 1 VO Plan 3300.00 3300.00 0.00 0.00 0.00 FAIL: NO ERRORS M pt Pad Plan MPI-17 Thor Plan MPI-17 L2 VO Plan 3300.00 3300.00 0.00 0.00 0.00 FAIL: NOERRORS MPt Pad Plan MPI-Freya Plan MPI-Freya VO Plan 9194.46 7575.00 365.72 143.04 222.68 Pass: Major Risk M pt Pad Plan MPI-LlNK Plan MPI-LlNK VO Plan: 375.25 375.00 61.03 10.03 51.01 Pass: Major Risk M pt Pad Plan MPI-Tank Plan MPI-Tank VO Plan: 350.62 350.00 264.36 9.41 254.95 Pass: Major Risk M pt Pad Plan MPI-Uller Plan MPI-Uller V1 Plan 450.26 450.00 264.18 10.14 254.05 Pass: Major Risk MPt Pad Plan MPI-Valhalla Plan MPI-Valhalla VO P 450.03 450.00 264.55 10.89 253.65 Pass: Major Risk Site: M pt H Pad Well: Plan Trinity Rule Assigned: Major Risk Wellpath: Trinity V1 Plan: Trinity Wp 1 V5 Inter-Site Error: 0.00 ft 4780.94 3870.37 9850.00 4059.23 13.27 98.25 25.24 100.24 6.000 1114.30 392.06 722.24 Pass 4777.27 3869.11 9875.00 4059.67 13.25 98.22 25.56 100.56 6.000 1090.37 391.53 698.83 Pass 4773.59 3867.85 9900.00 4060.11 13.22 98.20 25.90 100.90 6.000 1066.47 390.98 675.49 Pass 4769.92 3866.60 9925.00 4060.56 13.20 98.17 26.26 101.26 6.000 1042.62 390.40 652.22 Pass 4766.25 3865.34 9950.00 4061.00 13.18 98.14 26.63 101.63 6.000 1018.80 389.78 629.02 Pass 4762.58 3864.09 9975.00 4061.44 13.15 98.12 27.02 102.02 6.000 995.03 389.12 605.91 Pass 4758.90 3862.83 10000.00 4061.88 13.13 98.09 27.42 102.42 6.000 971.31 388.43 582.88 Pass 4755.23 3861.57 10025.00 4062.33 13.11 98.06 27.85 102.85 6.000 947.64 387.68 559.96 Pass Nam~ Plan MPI-17Thor -640 --600 --:500 -400 -300 -200 -100 -0 270 -100 -200 -300 -400 --:500 --600 -640 WELL DETAII.s ANTI·COLLlSION SETTINGS COMPANY DETAILS ,-Ni-S 'Ð-W NOf1hing rßsting LutÍ!uoo LOl1gil1Jdc- Slot HPAmœo Interpolation Method:MD Depth Range From 5125.00 Maxímum Range ! 114.55 Interval 25.00 To 9214.79 Refercncc: Plan: MPI~ 17 LJ WP06 1041,19 1550,92 60094.W.52 551789,55 7()"26'1 L520N 14'fJ,t'W,'X)5W N:A o Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [200ft/in] - -- ----------------------,--::1 SURVEY PR(XmAM Depth Fm Depth To Sw-vcv/PI¡¡n 5J2500 9214,79 Planncd'MPI-17L! WP06V2X roo! MWD+I!"R+MS W¡:¡JJ>ATII DFTAlì,S From Colour ToMD PbnMI'!-!7 L! 0 0 0 500 500 1000 1000 1500 Ref 6'J:>RKBt341; (,<) JtJft 1500 2000 2000 2500 2500 3500 27}UBQ Ü.(JO (j,OO 6930 3500 4000 4000 4500 4500 5000 LH,END 5000 5500 5500 6000 6000 6500 """""n", 6500 7000 7000 7500 7500 8000 8000 8500 8500 9000 90 S~oç MD Inc Ali J , 5 " 7 " <) IQ IJ 12 13 SECTION DFTA!1}; rVD DI...:g TFace VS<:c MPI-11 LI T!2 MP1,17 Ll T2.2 MPJ-I7L! Company: Field: Site: WeD: . WeUpath: Plan: Principal: Date: 4/1912004 Time: 09:05:10 1 Co-ordlnate(NE) Reference: Well: Plan MPI-17 Tho Vertieal (TVD) Reference: 69.3 RKB(34.3 + 35>. Seetion (VS) Reference: Well (O.OON,O.OOE 8.83Azi) Survey Calenlation Method: Minimum Curva e . Db: Oracle Date Composed: Version: Tied-to: . . BP Planning Report BP Amoco Milne Point MPtIPad Plan MPI·17 Thor Plan MPI·17 L2 MPI-17 L2 WP03 Yes Field: Milne Point /- '" North Slope t ) UNITED STATES LJ- ':--/. Map System:US State Plane Coordinate System 1927. ij \. Map Zone: =.. Geo Datum: NAD27 (Clarke 1866) ~ coordinat.e ys : Sys Datum: Mean Sea Level . Geomagneti: '\; . ?\ Site: MPtIPad ~ 'V TR-13-10 .. /' UNITED STATES: North Slope . ~ ' Site Position: Northing: 08388.01 \p tit(.ðe: From: Map Easting: 550245.83 L gi~e: Position Uncertainty: 0.00 ft " No' h Refer ce: Ground Level: 0.00 ft Grid Conv. rgence: Wett: 26 1.282 N 35 25.422 W True 0.39 deg ~SlotN e: Northing: 600 iJ39.5~ La ude: 70 26 11.520 N Eudog' :\' ft Dn::;12' <,\49 =.. ~P:: W . ~ Tie-on Depth' 4865.00 ft 69.3 RKB(34.3 + 35) 8]i~ 69.30 Above Syst Datum: Mean Sea Level 3/23/2004 N. Declinatiønt 24.92 deg 57553 nT " ':":~ l)fa.gJ~i~~gle: 80.85 deg Depth From (TVD) ~ ,tN/-S tEJ-~ \... Direction ft ,....--"\ ft Î' '11:.." \j deg 69.30 c::><:;.t!..! 0.0 ~ \.Q.,bo 278.83 Dia~:er~. "in Ik 4500 . 6125 "::::> ' ~ations Plan MPI-17 Thor Wett Position: +N/-S 1041.19 ft +E/-W 1550.92 ft Position Uncertainty: 0.00 ft Wettpath: Current Datum: Magnetic Data: Field Strength: Vertical Section: Casing Points MD ft 9205.00 Formations MD ft 4877.27 Targets Name Plan MPI-17 L2 TV» ft 3879.30 Lithology Dip Angle deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TV» ft 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3903.30 0.00 0.00 0.00 Dip Direet.ion deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Map Map <-- ....titude -> ~ Longitude TV» +N/-8 +EI-W Northing . Easting Deg MiD See Deg Min See ft ft ft ft ft 3779.30 114.90 -2074.00 6009540.00 549715.00 70 26 12.647 N 149 35 40.774 W 3779.30 1123.02 -6106.49 6010520.00 545676.00 70 26 22.540 N 149 37 39.147 W . . BP Planning Report BP Amoco Milne Point MPtIPad Plan MPI-17 Thor PI$n MPI-17 L2 Company: Field: Site: WeB: WeBpath: Targets Date: 4/19/2004 Time: ·09:05:10 Co-ordlnate(NE) Reference: Well: Plan MPI-17 Thor, Vertleal (TVD) Reference: 69.3 RKB(34.3 + 35) 69.3 Section (VS) Reference: Well (O,00N,O.OOE,2 Survey Calculation Method: Minimum CUrvature /' <- Longitude -> Peg Mln See Map Map Northing Easting ft ft 6010163.00 545573.00 6009574.00 548891.00 6009299.00 550058.0 6009558.00 550144 0 6009904.00 5490 .00 Name Description TV» Dip. Dlr. ft 3779.30 3779.30 3779.30 3779.30 3779.30 3879.30 +N/-S ft 766.71 154.62 -128.50 129.92 483.82 +EI-W ft -6211.98 -2897.83 -1732.65 -1644.85 -2776.53 -Polygon 2 -Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 MPI-17 L2 T3.2 26 19.035 N 26 13.035 N 26 10.254 N 26 12.796 N 26 16.273 N 149 37 42.234 W 149 36 4.953 W 149 35 30.754 W 149 3528.179 W 149 36 1.397 W 942.74 -6068.74 389.83 -3212.23 549.48 -4166.24 70 26 20.767 N 149 37 38.034 W 70 26 15.347 N 149 36 14.183 W 70 26 16.912 N 149 3642.186 W MPI-17 L2 T1.2 MPI-17 L2 T2.2 3889.30 3914.30 Plan Section Information MD ft 4865.00 4885.00 5082.60 5667.27 5774.12 5929.57 6210.58 6294.42 6354.65 7167.46 7262.09 7270.13 9205.13 Incl deg 70.00 70.23 93.92 93.92 90.00 90.16 90.16 88.50 88.39 88.39 91.03 91.03 91.03 AZim deg 285.00 287.54 286.70 286.70 285.00 278.78 278.78 281.70 279.29 279.29 282.00 281.68 281.68 +N/-S ft 40.85 46.12 103.27 270.85 300.00 332.02 374.93 389.83 400.80 532.00 549.4 551. 94 4 TV» ft 3899.12 3905.92 3932.97 3892.96 3889.30 3889.09 3888.32 3889.30 3890.94 3913.82 3914.30 3914.16 3879.30 +EI-W ft -1834.80 -1852.86 -2038. -2597 9 -270 .00 -2 2.03 - 29.75 212.23 -3271.43 -4073.26 -4166.24 -4174.11 -6068.74 DLS Build Turn deg/100ft dèg/100ft dêg,l100ft 0.00 0.00 0.00 12.00 1.14 12.70 12.00 11.99 -0.43 0.00 0.00 0.00 4.00 -3.67 -1.59 4.00 0.10 -4.00 0.00 0.00 0.00 4.00 -1.98 3.48 4.00 -0.19 -4.00 0.00 0.00 0.00 4.00 2.80 2.86 4.00 0.00 -4.00 0.00 0.00 0.00 TFO deg 0.00 85.00 -2.10 0.00 -156.61 -88.55 0.00 119.62 -92.73 0.00 45.68 -90.00 0.00 Target MPI-17 L2 T1.2 MPI-17 L2 T2.2 MPI-17 L2 T3.2 Survey MD ft 4865.00 4875.00 4877.27 4885.00 4900.00 Incl deg 70.00 70.11 70.14 70.23 72.03 Azim deg 285.00 286.27 286.56 287.54 287.47 EIW ft -1834.80 -1843.86 -1845.90 -1852.86 -1866.39 N/S ft 40.85 43.38 43.98 46.12 50.39 LLEW ft 283.89 292.94 294.98 301.94 315.47 LLNS ft -1082.04 -1084.57 -1085.17 -1087.31 -1091.57 Tool/Comment MWD+IFR+MS MWD+IFR+MS TSBD-Top OA MWD+IFR+MS MWD+IFR+MS 4925.00 4950.00 4975.00 5000.00 5025.00 5050.00 5075.00 5082.60 5100.00 5200.00 75.02 78.02 81.02 84.02 87.02 90.02 93.01 93.92 93.92 93.92 57.56 64.79 72.06 79.34 86.62 93.88 101.09 103.27 108.26 136.92 165.58 194.24 222.90 251.57 270.85 280.09 300.00 306.47 327.20 -1889.26 -1912.47 -1935.95 -1959.64 -1983.48 -2007.39 -2031.31 -2038.58 -2055.21 -2150.77 -2246.33 -2341.89 -2437.45 -2533.01 -2597.29 -2628.63 -2700.00 -2725.05 -2822.86 338.35 361.55 385.04 408.73 432.56 456.47 480.40 487.66 504.29 599.85 695.41 790.97 886.53 982.09 1046.37 1077.71 1149.08 1174.13 1271.94 -1098.75 MWD+IFR+MS -1105.98 MWD+IFR+MS -1113.25 MWD+IFR+MS -1120.53 MWD+IFR+MS -1127.81 MWD+IFR+MS -1135.07 MWD+IFR+MS -1142.28 MWD+IFR+MS -1144.46 MWD+IFR+MS -1149.45 MWD+IFR+MS -1178.11 MWD+IFR+MS 3864.79 3864.13 3863.67 3862.48 3855.64 3848.79 3841.95 3835.11 3828.26 3823.66 3821.76 3820.00 3819.99 3819.86 5300.00 5400.00 5500.00 5600.00 5667.27 5700.00 5774.12 5800.00 5900.00 -1206.77 MWD+IFR+MS -1235.43 MWD+IFR+MS -1264.09 MWD+IFR+MS -1292.75 MWD+IFR+MS -1312.03 MWD+IFR+MS -1321.28 MWD+IFR+MS -1341.19 MWD+IFR+MS -1347.66 MWD+IFR+MS -1368.39 MWD+IFR+MS 286.18 285.00 283.97 279.97 . . BP Planning Report Survey 5929.57 90.16 278.78 3819.79 332.02 -2852.03 1301.11 -1373.20 6000.00 90.16 278.78 3819.59 342.77 -2921.64 1370.72 M D+IFR+MS 6100.00 90.16 278.78 3819.32 358.04 -3020.46 1469.55 WD+IFR+MS 6200.00 90.16 278.78 3819.05 373.32 -3119.29 1568.37 MWD+IFR+MS 6210.58 90.16 278.78 3819.02 374.93 -3129.75 1578.83 MWD+IFR+MS 6294.42 88.50 281.70 3820.00 389.83 -3212.23 1661.31 MPI-17 L2 T1.2 6300.00 88.49 281 .48 3820.15 390.96 -3217.70 MWD+IFR+MS 6354.65 88.39 279.29 3821.64 400.80 -3271.43 MWD+IFR+MS 6400.00 88.39 279.29 3822.91 408.12 -3316.17 MWD+IFR+MS 6500.00 88.39 279.29 3825.73 424.26 -3414.82 MWD+IFR+MS 6600.00 88.39 279.29 3828.54 440.40 -3513.46 MWD+IFR+MS 6700.00 88.39 279.29 3831.36 456.55 -3612.11 -1497.73 MWD+IFR+MS 6800.00 88.39 279.29 3834.17 472.69 -3710.76 -1513.88 MWD+IFR+MS 6900.00 88.39 279.29 3836.99 488.83 -3809.41 -1530.02 MWD+IFR+MS 7000.00 88.39 279.29 3839.81 504.97 -3908.06 -1546.16 MWD+IFR+MS 7100.00 88.39 279.29 3842.62 521.11 -4006.71 -1562.30 MWD+IFR+MS 7167.46 88.39 279.29 3844.52 532.00 2522.34 -1573.19 MWD+IFR+MS 7200.00 89.30 280.22 3845.18 537.51 2554.40 -1578.70 MWD+IFR+MS 7262.09 91.03 282.00 3845.00 549.48 2615.32 -1590.67 MPI-17 L2 T2.2 7270.13 91.03 281.68 3844.86 551.13 2623.19 -1592.32 MWD+IFR+MS 7300.00 91.03 281.68 3844.32 557.17 2652.43 -1598.36 MWD+IFR+MS 7400.00 91.03 281.68 3842.52 -4301.27 2750.35 -1618.60 MWD+IFR+MS 7500.00 91.03 281.68 3840.71 -4399.18 2848.26 -1638.84 MWD+IFR+MS 7600.00 91.03 281.68 3838.91 -4497.09 2946.18 -1659.08 MWD+IFR+MS 7700.00 91.03 281.68 3837.11 -4595.01 3044.09 -1679.31 MWD+IFR+MS 7800.00 91.03 281.68 3835.31 -4692.92 3142.00 -1699.55 MWD+IFR+MS 7900.00 91.03 281.68 -4790.84 3239.92 -1719.79 MWD+IFR+MS 8000.00 91.03 281.68 -4888.75 3337.83 -1740.03 MWD+IFR+MS 8100.00 91.03 281.68 -4986.67 3435.75 -1760.27 MWD+IFR+MS 8200.00 91.03 281.68 -5084.58 3533.66 -1780.51 MWD+IFR+MS 8300.00 91.03 281.68 -5182.49 3631.57 -1800.74 MWD+IFR+MS 8400.00 91.03 779.79 -5280.41 3729.49 -1820.98 MWD+IFR+MS 8500.00 91.03 800.03 -5378.32 3827.40 -1841.22 MWD+IFR+MS 8600.00 91.03 820.27 -5476.24 3925.32 -1861.46 MWD+IFR+MS 8700.00 91.03 840.51 -5574.15 4023.23 -1881.70 MWD+IFR+MS 8800.00 91.03 860.75 -5672.06 4121.15 -1901.94 MWD+IFR+MS 8900.00 91.03 3815.50 880.99 -5769.98 4219.06 -1922.17 MWD+IFR+MS 9000.00 91.03 3813.69 901.22 -5867.89 4316.97 -1942.41 MWD+IFR+MS 9100.00 91.03 3811.89 921.46 -5965.81 4414.89 -1962.65 MWD+IFR+MS 9205.00 91.03 3810.00 942.71 -6068.62 4517.70 -1983.90 4 1/2" 9205.13 91.03 3810.00 942.74 -6068.74 4517.82 -1983.93 MPI-17 L2 T3.2 ., '';{ VI PT 204-1 00 SFD 619/2004 · OA Int PrOdUcer erval MPU 1-13: Never Completed MPU 1-1 z ( o Subject: MPI-17 Motherbor!nti-Collision From: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Date: Thu, 17 Jun 2004 11: 14:35 -0800 To: tom _ maunder@admin.state.ak.us e See attached summary report and travelling cylinders tor all three wellbores. «MPI-17 Mother Bore Anti-Collision Report.pdt» «Mother bore & NB Travelling Cylinders.pdf» «OA Lateral Travelling Cylinders.pdt» «OB Lateral Travelling Cylinders.pdt» S!&p Coyner ~~_~~. Energy s-I~ 907-564-4395 BPXA 907-748-3689 cell ..____..._m_.__mn_____..._ Mother Bore Anti-Collision MPI-17 Mother Bore Content-Description: Anti-Collision Report.pdf application! octet-stream base64 Content-Type: Content-Encoding: Mother bore & NB Travelling Cylinders.pdf Content-Type: Content-Encoding: ". Mother bore & NB Content-DescriptIOn: T 11' C 1· d df rave Ing y In ers.p application! octet-stream base64 ....... m...._.............._........._.................. Lateral Travelling Content-Type: Content-Encoding: C t t D . t" . OA Lateral Travelling on en - escrIp Ion. C 1· d df y In ers.p application! octet-stream base64 Lateral Travelling Content-Description: OB Lateral Travelling Content-Type: application!octet-stream Content-Encoding: base64 1 of 1 6/17/200412:16 PM RE: MPI-17 Multi-Lateral APD's - e Subject: RE: MPI-17 Multi-Lateral APD's From: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Date: Wed, 16 Jun 2004 17:17:11 -0800 To: Thomas Maunder <tom_maunder@admin.state.ak.us> Since everybody (including me) likes seeing the ASP's, it would be best to replace the originals with the "ASP" versions don't you think? Please make the switch. SkJp Coyner 907-564-4395 BPXA 907-748-3689 cell -----Original Message----- From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Wednesday, June 16, 2004 4:49 PM To: Coyner, Skip (NATCHIQ) Subject: Re: MPI-17 Multi-Lateral APD's Skip, I am getting back to the 1-17 family. Should these directional plans be substituted for those that were included in the original applications?? Tom Coyner, Skip (NA TCHIQ) wrote: OK, we have the various Sperry wellplans sorted out and converted to ASP's. For somr reason, the common BHL (ASP's) moved 42.5 ft and all three lateral "entry points" moved a little as well. It seems like there was a minute azimuth change somewhere in the Compass program, but again, we're all on the same page now. I have attached all three well plans along with the front (data) sheet from the program. The revised data sheet has all necessary corrections on it: a) entry points, b) common BHl and c) TVO of the NB lateral. Let me know if you need anything else. «L2 asps.pdf» «1-17 asps.pdf» «L 1 asps.pdf» «MPI-17 Data Sheet revised.lIP» SkJp Coyner ~~_~~; Energy s-ICIIII 907-564-4395 BPXA 907-748-3689 cell I of 1 6/17/20047:10 AM ................ .................... ....,.. ....rr......--................ ........... - ------- -- - ---- e e Subject: RE: MPI-17, Application for Permit to Drill From: "Coyner, Skip (NA TCHIQ)" <coynsO@BP.com> Date: Thu, 10 Jun 2004 16:03:01 -0800 To: Thomas Maunder <toffi_maunder@admin.state.ak.us> Roger that. Skip Coyner 907-564-4395 BPXA 907-748-3689 cell -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Thursday, June 10, 2004 3:59 PM To: Coyner, Skip (NATCHIQ) Subject: Re: MPI-17, Application for Permit to Drill Thanks Skip. I am glad you place. Whole Tom I will await the new zips. are aware of I-10. You'll at least have a stack in lot more options. Coyner, Skip (NATCHIQ) wrote: First, I found a bunch of bugs in the Sperry wellplans with asp's that I sent you. So, throw them away. We're working on getting everyone on the same page. I'll re-send them when they are correct. Things just aren't the same since Ken Alan switched jobs. MPI-17 etal will be in hydraulic unit 3 along with the dreaded MPI-10. Since MPI-10 killed us a few years back, MPU has reduced their injection rates and pressures. Furthermore, I-10 will not be injecting while we're drilling. I was still here at BP when Steve Shultz took the kick a couple of years ago. So I am familiar with the incident. We believe that the fault block (hydraulic unit) is no longer over pressured - although we do list pore pressures at 9.1 ppg. We will be at > 9.4 ppg and drilling carefully. Skip Coyner 907-564-4395 BPXA 907-748-3689 cell 1 of 1 6/17/200410:18 AM .............. .I............. .... " .l.:t.yy.L..............L.........,.....L ....'\....L... ......L.L..........LL. L...... .&..o"..L..L.L..L e e Subject: Re: MPI-17, Application for Permit to Drill From: Thomas Maunder <tom _ maunder@admin.state.ak.us> Date: Thu, 10 Jun 2004 14:22:36 -0800 To: "Coyner, Skip (NATCHIQ)" <coynsO@BP.com> Well, I did ask for it all. Aren't zip files grand?? On the possible communication from 1-10 to 1-13, I realize the path is tortuous, but in the information I remember seeing on the pressure fall-off test there was a doubling of the derivative slope that indicated communication to something with a large porosity. The speculation was a fault and all that was needed to confirm it was allowing to pressure to continue to decline to some calculated value. There was even a time prediction of when the pressure would be reached. What HU(s) are the proposed 1-17 family in?? Tom Coyner, Skip (NATCHIQ) wrote: Here you go. Question: .... is there any plan to cover these faults?? Answer: Yes, the planned TOC will be 500' above TUCZ - ± 3100'MD Question: You state that the pressure situation has been rectified, how has this been done?? Answer All surrounding injectors in adjacent Hydraulic Units will be shut-in while drilling. Question: Do the reservoir engineers and geologists see communication between the various wells (1-11, I-11L1, 1-10 and 1-08) in the area or are they compartmentalized?? Answer: MPI-12, MPI-11, and MPI-13 are geologically isolated from MPI-08 and MPI-10i ("i" denotes an injector). MPI-12, MPI-11, and MPI-13i are in Hydraulic Unit 13, MPI-10i in HU 3, and MPI-08 in HU 2. This isolation is determined by two large faults (-100-300' displacement) traveling North-South and East-West. This also confirmed with different oil API between HU 13 and HU 3. In addition, pressure transient analysis in MPI-12 have determined that this well is in a very small compartment and not communicating to even to MPH-13. This has explained the poor performance of MPI-12. Finally, we have not seen any pressure indication in MPI-12 or MPI-08 since MPI-10i was put back on injection. Question: Close approach issues. Please submit the data. A traveling cylinder plot would be appreciated as part of this. Answer: See attachments. Question: I remember some pressure fall-off tests being done on possibly MPI-10 that may have indicated that the water was communicating via a fault. Was a report ever issued on that testing?? Answer: There was no formal report written on that PTA, but the test did indicate fracture a of 408' right after a high injection period (-3000 bwpd). This fracture was reduced to 75' after a period of lower injection (-1000 bwpd). This lower injection rate has been continued since then. Even during the high injection, it is highly unlikely that MPI-10i was communicating to MPI-12 due to the 2000' feet of tortuous 10f2 6/17/200410:18 AM ~~_. ....~~ J>- ~., ~ -rr--------- --- - ~----- distance between wells~ e Question: In the directional planning information, the positions (x,y) of the formation tops and casing points are not given. Would you please supply complete listings?? Answer: See attachments: Skip Coyner 907-564-4395 BPXA 907-748-3689 cell 20f2 6/17/200410:18 AM . . PERMIT TO DRILL 20 MC 25.005 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary wellbore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only include information under (c) of this section that is unique to that branch and need not include the $100 fee. . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /J?P ¡;( ;I-I? L L- PTD# 2DL/-IDO t/"Development Service CHECK WHAT APPLIES ADD-ONS (OPTIONS) M1JLTI LATERAL / (If API number last two (2) digits are between 60-69) Exploration Stratigraphic "CLUE" Tbe permit is for a ne~ wellbore segment of existing well /})Pt..t.. .1·-/7 Permit No,¡bC¡-Ò~API N~. t.5-oa,c7~- 2 32/ 2--LK....> Production sbould continue to he reported as a function' of tbe original API number. stated a hove. BOLE In accordance witb 20 AAC 25.005(1), aU records, data and logs acquired for tbe pilot bole must be clearly differentiated In botb name (name on permit plus PH) and API Dumber (50 70/80) from records, data and logs acquired for we)] (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Tbe permit is approved subject ·to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spacing exception. (Companv Name) assumes tbe liability of any protest to tbe spacing exception tbat may occur. A)) dry ditch sample sets submitted to tbe Commission must be in no greater tban 30' sample intenals from beJow tbe permafrost or from where sampJes are first caugbt and 10' sampJe h:iterva)s tbrougb target zones. Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB 1-17L2 Program DEV Well bore seg ~ PTD#: 2041000 Company BP EXPLORATION (ALASKA) INC Initial ClassfType DEV / PEND GeoArea 890 Unit 11328 On/Off Shore On Annular Disposal D Administration 1 PermiUee attaçhed_ - - - - - - - - - - - - - -- - - - - - - No . Multi-lateral well: _n.oJeerequJred. - - - - - - - - - - - - - - - - - - - - - - 2 _Leasen umber appropriate - - - - - - - - - - - - - - _ Yes_ Top_prQducttve lnteNal and TD.io .l\DL 02.5517. _ _ _ _ _ . _ - - - - -- 3 _U_nlque weltn.am.e_a!ld oumb.er . . . . . . . . . . . . . . . . . . . . . . . . . · . . . . . . . .Yes. . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 4 Well locat.ed lna defioed -ppol. - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _. Yes Thi~ muliHatera.1 wlll-produc;eJrom. tbe O.l\-salld.of the _Sçhrader I3tuff Oil PPQI;.goYeroed.byCO-477:.. . 5 WelllQcated proper .dlstance from driJling uoitb.ouodary_ . . _ _ . _ . . . _ . _ _ . . . . .Yes CO -477: sp_ecifiesonly .1 O-acre spa.ctng conJQrmtng to_ goyernmelltal Qtr-Qtr-Qtr sectiolls_and mpre.tha_n500' 6 WelUQcat.ed pr.operdlstance. from Qther welJs_ - - - - - - _ . . . . _ _ _ .Yes frQm the eJderior bQundary of the affected a.rea. of .C.Q 477._ 1-17.L2CQnJQrms to these Jequirements, _ 7 _S_uffiçieot acreage_aYailable in_ driUiog unJt_ - - - - - - - - - - · _ _ _ . . . _ .Yes Nearby offset welJ I,. t3.h.as !leVer bee!l perforated - jU~ oot open JQ the pOol. The other.n.earby offset weJls 8 Ifdeyiated, Js weJlbQre platiocJu_ded . _ _ _ _ . . _ _ _ _ . . - - - - - - - - . .Yes I,.Q6, 1.-08, 1.-10, 1-1 t & t-11L1 are.opell tpthe.p.ooljo the OAsaod~ byLnotio the same qtr-qtr-qtr se.ctJons._ 9 O-perator only: affected pa.rty _ - - - - - - - - - - - - - - - - - - - - _ .Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 10 .O-perator bas.apprppriate. bond tnJorce . . . . . . . . . . . . . . . . . . . . · . . . . . . . .Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 11 Permit c.a!l be issued witbQut co.nservatioo order_ - - - - - - . _ _ .Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 12 Permit ca!l be tssued _witbQut admioistratÎllea-pprpva.1 _ _ . _ . . . . . . . . .Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- SFD 6/9/2004 13 Can permit be approved before 15-day wait Yes . 14 W~II located wtthio area alld.strataauthorlzed by_lojectipo Ord.er # (put 10# in. comm_e!lts). (For .NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - 15 All welJs. within .1l4.mite.ar~a.of review id.eotified (Fpr ~ervJc.ewell OOly). . _ . . . . . . . . . . . . .NA - - - ~ - - - - - ~ - - - - - - - - - - . . - - - - - - - - - - - - . - - - - - . - - - - - - - - - - - - - - - - - - - - - - 16 Pr~-produced i!ljector; duratiQnof pre--productioo tess. than_ 3. months (For.servi.ce well QnJy) . _ NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 ACMP finding of Con.sisteocy_h_as Þee_nj~sued. for_ tbis pr.oject .... _........ .NA WelJ drllled frQm exJs.tiog pad, _ . . . _ _ _ . . . - - - - - - - - - - - - - - - - - - - - Engineering 18 Cooductor string_provided. _ _ _ . . . . . . _ . . . _ . - - - - - - -- . _ . . . Yes Con.ductor _setio mptherbore,. MPJ.-17. . - - - - - - - - - - - - - - - - - - - - - - - - -- 19 Swface.casillgpJotec.t~aILknownUSDWs. . _ _ _ . _ . . . . . _ . . . . _ . _ _ . _ _ . . . _ . . .NA ,l\I[ aquifers exempted 40 cm 147. t02(b)(3), . . . . . . . . . . _ . . . . . . . . . . . . . . . 20 _CMT v.ot a.dequ_ate. to çircutate.o.ncond_uctor. & SUJtcsg . ... _ _..... _ _..... Yes Syrfa~ casing ~mented .to su.rface_ io motherþore. MPI-17, . . . . . _ _ . . _ . _ . . . - - - - - - - 21 CMT v.oJ. adeQuate.to tie-in long .string to surf ~g_ _ _ _ _ . . _ _ _ _ _ . . _ _ . _ . . . _ _ _N.o. Lntermediate. casi!lg planned to b.eœmented_ a.bpve a.nyhydroc.arboo zone.. . - - - - - - - - 22 .CMTwiIJ coyer.aU koown.pro.ductiye bQrizons _ _ . . . _ . _ . . . . . . _ . _ . . . . . . . . . . . . No_ Slotte.dlioer _completto!l plaOlled._ . . . . . . _ . . . . . . . . . . . . . . . . - - - - - - -- 23 .C.asiog desig!ls ad_eQya.te fpr C,_ r, 13.& permafr.ost - - - - - - - - . Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 Adequate tankage. OJ re_serve pit - - - - . . . - - - - . . . - - _ _ . . _ _ _ _ _ . . _ _ _ . .Yes Rig js.e.quipped.with steeLpits.. No rese.J'\le_pJt-pla!loed, Wa.steto all ap-proyed disppsaJ well. . . _ _ . . 25 Ifue-drill, bas_a_ 10,.403 fOJ aba.ndonme_nt beeo apPJoved . . _ _ _.... _ _ _ _... _ _ N.A. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 Adequatewellbore ~eparatjo.n-pro-po~ed. . . . . . . _ . . . . . . . . . . . . _ . . . . . . . . . . . . .Y.es PrpJ5:imi.ty: a.nalysis pertorme.d, Nearest we IJ b.o res pre.tbe otber Jaíerals !J 00' íV.d .aþove .a!ld belQw thi$ .ooe. 27 Jf.diverter Jequired, does it.meet regula.tioos. . . . . . . _ . . . . . . . . . . . . . . . . . .NA 60P wiJl.atready be in -pla~.. . . - - - - - - - - - - - -- - - - -- - - - - -- Appr Date 28 .Drillio9 fluid. program sc.hematic_&. eq.uip listadequate _ . - - - - - - - - - - - - - - .. Yes Maximum possible.BHP9,tEMW, Plarme.d MW9A.-.9,6 EMW.. . . _ _ . . . . . _ . . . . . _ _ . . TEM 6/18/2004 29 _BOPEs,dpthey meetreguJa.tion . - - - - - - -- . . _ . . . . . . _ _ . _ . . . . . _ . Yes - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- . p.Q'M 30 .BOPEpress ratiog ap-propriate; .test to (pu.t psig i.n _comments) . _ _.. _.... Yes M.l\SP çqlc;uJaíed.at 1453 -psi, 3000p.stte~t pes_sure -plan oe_d , . . . . _ _ . . _ . _ . . . _ . . . . . . ~l{D 31 _C.hokema.nifold cQmpJie~ w/APL RF>-53 (May 84) - - - - . - - - - _ _ . . _ _ _ . . . . _ _ _ .Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - -- 32 WQrk will occur withoytoperatjonsbytdown. . _ _ _ . . _ . . _ . . . . . _ _ . . . _ . . . . . . Yes - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - 33 Js pres.e!lce. oJ H2S gas probable. _ _ _ . . _ . _ _ _ . . . _ _ _ _ . . . _ _ _ _ .N.o_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 34 Mecha_n[caLcoodJtto!l pfwells wtthio .l\OR verified (Fpr.s.ervjœ welJ only)_ ...NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geology 35 Permit c_a!l be issued w/Q hydrogen sulfide meas_ures. . - - - - - - . . . . . _ . .Y.es Skip Coyner, 6P,.6/9/04; NoH2Sk!lown.io SchJad.er 61uff reservoJrs aU-Pad._ . . . . . _ . . . 36 _D_ata.preseoted on pote_ntial pveJPre~sure _zooes _ . . _ _ . _ . _ . . . .. . . . _Yes Expected reservoir -pre.sSUJe is _9, 1.p-pg EMW; wilLbe _drilled with 9.4 ,. 9.6 -ppg mud. Pre.vi.ou~ly: over . Appr Date 37 Sei.sm[c_analysJs of shaJlow gas.zpoes_ . . . . . - -...... _ _ _ _.. _ _ _ _... _ _ _NA. pressured san.ds due tp pffset injectors .hallebeeo reduced to. normal pr.essure (S, COY!ler, 6F:>,6-9_-Q4) SFD 6/9/2004 38 .Seabedcoodjtjpo survey.(if off-sh.ore) . . . - - - . . - - - - . .. - - - _ _ . . _ _ _ _ . . _ N_Ä. See Drilling Hazard.s.&. Contiogeocies.8ectton pf a.pplication, 39 . CQnta.ct nam.elpholleJorweelsly prpgressreports [exploratpry .only] - - - - - - - - NA Geologic Engineering Public Commissioner: Date: Commissioner: Da~~m;fJzp;·œ p0f b /2/ I í e e Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. r . Sperry-Sun Drilling Services LIS Scan Utility . Ao'f- (ð-O $Revision: 3 $ LisLib $Revision: 4 $ Fri Sep 03 16:02:30 2004 :1 /~773 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ............ . UNKNOWN Continuation Number..... .01 Previous Reel Name.. .... . UNKNOWN Comments.............. ...STS LIS Writing Library. Scientific Technical Services Tape Header Service name....... ..... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name........... .... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPI-17 L2 500292321261 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 03-SEP-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003171003 T. MCGUIRE D. GREEN MWD RUN 2 MW0003171003 C.A. DEMOSKI E. VAUGHN MWD RUN 3 MW0003171003 C.A. DEMOSKI E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 MW0003171003 T. MCGUIRE E. VAUGHN MWD RUN 10 MW0003171003 T. MCGUIRE D. GREEN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 33 13N 10E 2323 3581 68.35 34.60 RECEtVED # WELL CASING RECORD Stp'¡ 2B~\4 OPEN HOLE CASING DRILLERS t..ulil & GaS (JOII:> vOll1mìsiDn Anchorage 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING . BIT SIZE (IN) 13.500 9.875 6.750 SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 114.0 2378.0 4840.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 9 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE WHIPSTOCK WAS AT 4840'MD/3887'TVD AND THE BOTTOM WAS AT 4852'MD/3891'TVD, WITHIN THE RUN 3 INTERVAL OF MPI-17. ONLY SROP DATA ARE PRESENTED FOR RUN 9. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2, 3, 10 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM K. COONEY (SIS/BP), DATED 8/24/04, QUOTING AUTHORIZATION FROM MIKIE SMITH (BP GEOLOGIST). MWD DATA ARE CONSIDERED PDC. LATERAL AND PLUG BACK WELLBORES WERE SHIFTED/CORRECTED TO THE MAIN MPI-17 WELLBORE. 7. MWD RUNS 1 - 3, 9, 10 REPRESENT WELL MPI-17 L2 WITH API#: 50-029- 23212-61. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9226'MD/3867'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. $ File Header Service name........ .... .STSLIB.001 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............ ....LO Previous File Name...... .STSLIB.OOO Comment Record . . FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 267.0 312.0 2343.5 2343.5 2343.5 2343.5 2343.5 STOP DEPTH 9165.0 9222.5 9172.0 91 72.0 9172.0 9172.0 9172.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 267.0 2388.0 MWD 2 2388.0 4183.0 MWD 3 4183.0 4840.0 MWD 9 4840.5 4863.0 MWD 10 4863.0 9222.5 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..... ....... ......0 Data Specification Block Type.....O Logging Direction. ..... .......... . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................. ...60 .1IN Max frames per record.......... ...Undefined Absent value........ ...... ...... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 267 9222.5 4744.75 17912 267 9222.5 ROP MWD FT/H 0.55 1345.47 198.104 17822 312 9222.5 GR MWD API 10.62 127.4 72.8851 17797 267 9165 RPX MWD OHMM 2.04 2000 48.176 13658 2343.5 9172 RPS MWD OHMM 2.24 2000 41.6801 13658 2343.5 9172 RPM MWD OHMM 2.07 2000 38.2397 13658 2343.5 9172 RPD MWD OHMM 0.25 2000 36.8249 13658 2343.5 9172 FET MWD HOUR . 0.09 35.88 0.887603 13658 _343.5 9172 First Reading For Entire File... ...... .267 Last Reading For Entire File.... ..... ..9222.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation... ....04/09/03 Maximum Physical Record..65535 File Type....... ........ .LO Next File Name. ......... .STSLIB.002 Physical EOF File Header Service name........ ... ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type.............. ..LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 267.0 312.0 STOP DEPTH 2388.0 2388.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 13 -JUL-04 Insite 66.37 Memory 2388.0 312.0 2388.0 5.5 13.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY TOOL NUMBER # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 .0 # BOREHOLE CONDITIONS MUD TYPE: SPUD MUD MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: . 9.30 75.0 8.5 500 10.8 . .000 .000 .000 .000 .0 77.0 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type. ...... ......... ..0 Data Specification Block Type.....O Logging Direction.... ......... ....Down Optical log depth units......... ..Feet Data Reference Point............. . Undefined Frame Spacing................. ....60 .1IN Max frames per record.. .......... . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code Offset o 4 8 Channel 1 2 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 267 2388 1327.5 4243 267 2388 ROP MWD010 FT/H 0.55 892.46 181.728 4153 312 2388 GR MWD010 API 24.32 118.92 65.8669 4243 267 2388 First Reading For Entire File......... .267 Last Reading For Entire File... ..... ...2388 File Trailer Service name. .., ........ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.... ... ........ .LO Next File Name........ ...STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... . Version Number.......... .1.0.0 Date of Generation.... ...04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name... ... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 3 . header data for each bit run in separate files. 2 .5000 START DEPTH 2343.5 2343.5 2343.5 2343.5 2343.5 2388.5 2388.5 STOP DEPTH 4138.5 4138.5 4138.5 4138.5 4138.5 4146.0 4183.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): 15-JUL-04 Insite 66.37 Memory 4183.0 2388.0 4183.0 13.6 55.4 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.40 51. 0 9.5 640 6.6 2.600 1.800 2.200 3.000 65.0 97.0 65.0 65.0 . . EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type. ....0 Logging Direction................ . Down Optical log depth units.. ........ .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value................. '" ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2343.5 4183 3263.25 3680 2343.5 4183 ROP MWD020 FT/H 19.35 1068.52 250.923 3590 2388.5 4183 GR MWD020 API 10.62 118.89 65.0636 3516 2388.5 4146 RPX MWD020 OHMM 2.04 673.71 14.4059 3591 2343.5 4138.5 RPS MWD020 OHMM 2.24 678.65 15.3905 3591 2343.5 4138.5 RPM MWD020 OHMM 2.07 2000 18.132 3591 2343.5 4138.5 RPD MWD020 OHMM 0.25 2000 32.6395 3591 2343.5 4138.5 FET MWD020 HOUR 0.09 35.88 1.46318 3591 2343.5 4138.5 First Reading For Entire File....... ...2343.5 Last Reading For Entire File.......... .4183 File Trailer Service name. ........... .STSLIB.003 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name...... ...... .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation... '" .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record . FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 4 . header data for each bit run in separate files. 3 .5000 START DEPTH 4139.0 4139.0 4139.0 4139.0 4139.0 4146.5 4183.5 STOP DEPTH 4840.0 4840.0 4840.0 4840.0 4840.0 4840.0 4840.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O 16-JUL-04 Insite 66.37 Memory 4840.0 4183.0 4840.0 56.5 107.9 TOOL NUMBER 053519 134758 9.875 2378.0 LSND 9.50 57.0 9.5 600 5.8 3.800 2.320 3.500 4.000 62.0 105.8 62.0 62.0 . Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.............. ...... .60 .1IN Max frames per record. .......... ..Undefined Absent value..... ....... ........ ..-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4139 4840 4489.5 1403 4139 4840 ROP MWD030 FT/H 4.3 354.88 158.414 1314 4183.5 4840 GR MWD030 API 32.47 117.49 77.2128 1388 4146.5 4840 RPX MWD030 OHMM 5.32 145.69 16.9113 1403 4139 4840 RPS MWD030 OHMM 5.53 167.99 18.1472 1403 4139 4840 RPM MWD030 OHMM 5.79 230.55 20.2081 1403 4139 4840 RPD MWD030 OHMM 6.04 198.17 20.7162 1403 4139 4840 FET MWD030 HOUR 0.24 9.26 1.13212 1403 4139 4840 First Reading For Entire File......... .4139 Last Reading For Entire File......... ..4840 File Trailer Service name........... ..STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/09/03 Maximum Physical Record. .65535 File Type............... .LO Next File Name........ ...STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # 5 header data for each bit run in separate files. 9 .5000 . FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 4840.5 $ STOP DEPTH 4863.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ..... ....... ..0 Data Specification Block Type. ....0 Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point........ .... ..Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value........... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD090 . 27-JUL-04 Insite 66.37 Memory 4866.0 4840.0 4866.0 .0 .0 TOOL NUMBER 9.875 4840.0 Versapro 9.60 80.0 .0 31000 .0 .000 .000 .000 .000 .0 89.6 .0 .0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 . . First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4840.5 4863 4851.75 46 4840.5 4863 ROP MWD090 FT/H 2.02 12.91 7.74109 46 4840.5 4863 First Reading For Entire File......... .4840.5 Last Reading For Entire File.......... .4863 File Trailer Service name......... ....STSLIB.005 Service Sub Level Name... Version Number....... ....1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name. ......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation...... .04/09/03 Maximum Physical Record..65535 File Type...... ......... .LO Previous File Name...... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 header data for each bit run in separate files. 10 .5000 START DEPTH 4840.5 4840.5 4840.5 4840.5 4840.5 4840.5 4863.5 STOP DEPTH 9172.0 9172.0 9172.0 9172.0 9165.0 9172.0 9222.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 29-JUL-04 Insite 66.37 Memory 9226.0 4866.0 9226.0 70.0 97.3 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER . DGR EWR4 $ DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type... ..0 Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point.... ........ ..Undefined Frame Spacing................ .....60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 . 184054 159436 13.500 4840.0 VersaPro 9.50 68.0 .0 34000 .0 .000 .000 .000 .000 .0 116.6 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 RPX MWD100 OHMM 4 1 68 12 4 RPS MWD100 OHMM 4 1 68 16 5 RPM MWD100 OHMM 4 1 68 20 6 RPD MWD100 OHMM 4 1 68 24 7 FET MWD100 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4840.5 9222.5 7031.5 8765 4840.5 9222.5 ROP MWD100 FT/H 5.98 1345.47 191.141 8719 4863.5 9222.5 GR MWD100 API 45.38 127.4 78.8125 8650 4840.5 9165 RPX MWD100 OHMM 6.3 2000 67.2356 8664 4840.5 9172 RPS MWD100 OHMM 6.4 2000 56.3872 8664 4840.5 9172 RPM MWD100 OHMM 4.73 2000 49.4937 8664 4840.5 9172 RPD MWD100 OHMM 2.4 2000 41.1682 8664 4840.5 9172 FET MWD100 HOUR 0.26 15.27 0.609447 8664 4840.5 9172 . . First Reading For Entire File......... .4840.5 Last Reading For Entire File....... ....9222.5 File Trailer Service name... ......... .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation... ... .04/09/03 Maximum Physical Record. .65535 File Type............. ...LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name...... .... ...LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............ ....UNKNOWN Continuation Number..... .01 Next Tape Name. ......... . UNKNOWN Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/09/03 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name........ ...... ..UNKNOWN Continuation Number.. ... .01 Next Reel Name.......... . UNKNOWN Comments... ..... ........ .STS LIS writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File