Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-111
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ º ld- - II L Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
o Rescan Needed "'1111111111111111
RESCAN
~Olor Items:
o Greyscale Items:
DIGITAL DATA
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
D Diskettes, No.
D Other, Norrype:
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
D Other:
D Logs of various kinds:
NOTES:
o Other::
BY:
~
Date C¡/I<6/Db
151
VV1P
BY: ~
,..
Date cr 11f? /00
:+.. x 30 = to D +
Date:cr! ¡r? /Ð~
151
111/111111111111111
VV1P
(Ps
MP
Project Proofing
Scanning Preparation
BY: C_ Maria")
b = TOTAL PAGES
(Count does not include cover sheet)
151
Production Scanning
11I1111111111111111
Stage 1
Page Count from Scanned File: (P (P (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
G- Maria} Date: q / IS/Db
If NO in stage 1, page(s) discrepancies were found: YES
NO
BY:
Isl
htiP
NO
Stage 1
BY:
Maria
Date:
151
111111111111111111I
Scanning is complete at this point unless rescanning is required.
ReScanned
111111/111111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
111111111111" 11111
10/6/2005 Well History File Cover Page.doc
• •
.:
MICROFILMED
03/01/2008
DO NOT PLACE
~~_
~~~.
t.
-y
_ ~_.
ANY NEW MATERIAL
UNDER THfS PAGE
F:\LaserFiche\CvrPgs_Inserts\Microfilm_Marker.doc
.
Transmittal Form
.
r'ill
BAKER
HUGHES
I
I r"--;~1~~-" ;;~~I;~\-;-~~
I __ ._._______ _ ._ m
, "-'.-~:;~.~~;~:.:::;~~:~:. I
ì i
1,_'" ....r> ..~,. ,''''.. ,.,...,~ I
i'·· ___.._______.'_.m_ '_ .:
17"F ~_~ <~.~ ~":"'L ¡
I
........" .... ,s.," "...:-:/
I
I
I
I
!
I
i
I
INTEQ
,.-,.- .
To:
Anchorage GEOScience Center
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention:
Reference: 1C-08L1PB1-
Helen Warman
Contains the following:
II
II
!i
!I
II
I¡
fi ß 1.ot
_i\t..\MF..D j~~ \1 ill
5~w- !I
II
L
. ~I. ".' ,
...._~~~',- _~,:.~.~,,"'f '"I
.* I·
." ¡
I
!
i
!.
!i
I
1 LDWG Compact Disc
(Includes Grapþ.ic Image files)
1 LDWG lister summary
1 bluelines - MPR-DIR_md Log
1 bluelines - MPR-DIR _tvd Log
,
¡
i
i
!
¡
¡
!
!
i
I LAC Job#: 726009
f
il
Sent By: Cosetta Todirica
Re<eived By: ß1t _
Date: Dec. 10, 2006
Date: 11..t;/D?
/
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COpy
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
;)0(./" \ I \ ~1"-l30 q
.
.
Transmittal Form
r'i_
BAKER
HUGHES
! 1-- - ';!~; ~ . ¡~:~-:~."\ ; ~UJ
! --
:....",..... -.. '" .... ".,":."
i.' .,,', ¡
INTEQ
¡ ','". - - - . -~.:.:' - . - . '-:', ' :
!":.:"'. ~' .~~, .,. :"'~'..!
1~::.;'"0.,.";·-·~~··¡
Anchorage GEOScience Center
To: AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention: Helen Warman
Reference: 1C-08L1 & 1C-08L101-
II Contains the following:
2 LDWG Compact Disc
(Includes Graphic Image files)
2 LDWG lister summary
2 bluelines - MPR-DIR_md Log
2 bluelines - MPR-DIR_tvd Log
5GANNED JAN 0 8 2007
LAC Job#: 726009
Sent By: cose71::'--
Received By: {2
:1
II
l'
II
;¡
1!
!i
11
II
II
!I
II
i
!
i
h
II
II
;
i
i,
I!
!I
"
Date: Dec. 10, 2006
Date: r/5/D?
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COpy
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
-..r· - ~
.-.
:;J:;4' ,<*' It I
/436J
'-
, ,.~
I?~
DATA SUBMITTAL COMPLIANCE REPORT
9/11/2006
Perm it to Drill 204111 0
Well Name/No. KUPARUK RIV UNIT 1C·08L 1
Operator CONOCOPHILLlPS ALASKA INC
-¥"'¿ J ~~r
API No. 50-029-20585-60-0
MD 10954. / TVD 6556 /' Completion Date 8/13/2004
Completion Status 1-01L
--~-~-
~._---_.
REQUIRED INFORMATION
Mud Log No
Samples No
----
~ctional surve~_
-----~._~-
DATA INFORMATION
Types Electric or Other Logs Run: GR, RES
Well Log Information:
Log/
Data Digital
~ Me~~t
pt
Mf
¡ W C Lis
L~_n
I
\
fbºg
I
~
Electr
Dataset
Number
Run
No
Log Log
Scale Media
Name
Directional Survey
Directional Survey
14040 LIS Verification
14040 Induction/Resistivity
14040 "IJudlon/Resistivity
5 Blu
5 Blu
2~ Blu MD
25 Blu rVj)
14040 Indurtio.R/Resistivity
14040 Induction/Resistivity
14040 Induction/Resistivity
Current Status 1-01L
UIC N
-~-------~.~---,---~._---'-~--'----
_._-~--~-----_.~-_.__.------
(data taken from Logs Portion of Master Well Data Maint
Interval .
OH/
Start Stop CH Received Comments
-
8930 10954 11/8/2004
8900 10175 11/8/2004 PB1
0 0 Open 8/22/2006
8938 10954 Open 8/20/2006 GR, ROP, Res
8930 10954 Open 8/22/2006 Multi Propagation Res GR
6-Aug-2004 w/Graphics
8930 10954 Open 8/22/2006 Multi Propagation Res GR
6-Aug-2004 W/Graphics
8930 10954 Open 8/22/2006 Multi Propagation Res GR
6-Aug-2004 w/Graphics
8930 10954 Open 8/22/2006 Multi Propagation Res
6-Aug-2004 w/Graphics
---~~
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORMATION
y~
Daily History Received?
Well Cored?
Chips Received? .", I N
Formation Tops
Analysis
Received?
~
Comments:
Sample
Set
Number Comments
.
(hN
0N
DATA SUBMITTAL COMPLIANCE REPORT
9/11/2006
Permit to Drill 2041110
Well Name/No. KUPARUK RIV UNIT 1C-08L 1
Operator CONOCOPHILLIPS ALASKA INC
MD 10954
TVD 6556
Completion Date 8/13/2004
Completion Status 1-01L
Current Status 1-01L
UIC N
-_._--~
-~.-
r-so~-
Compliance Reviewed By:
API No. 50-029-20585-60-00
Date:
-l~J:iI-~f4 ~--
.
.
.
Transmittal Form
.
r&l_
BAKER
MUGHU
II===~_
I;~,;-';;=~,·;;
i~"'''''''''''}'_';;'''''H\~/:i
IO~_ r:, ',:" ....
IOI!.if -i: .... .~ .~, ",",.:.~
':;,,:":. ::., ; I
I ,I
¡ ¡ I
i :
I j I
I
I
INTEQ
To: AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention: Helen Warman
Reference: 1C-08L1PB1
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 bluelines - MPR-DIR_md Log
1 bluelines - MPR-DIR_tvd Log
I LAC Job#: 726009
Sent By: Cosetta Todirica
Received By: C,~
Anchorage GEOScience Center
C},
/,
ì
I
I
¡
I
,
II
r
I
i
I
I
I
DatRE';~b~E
Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Q6 ({ - III 1i JL../ ÐÓCi
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
~- ,_"__~..2~WJ~.~,.;~.___. .~...¿...!
[~_~.:~?~~:~i:__:'~j
1::'1_:":_
I. ':..
ru-'-
I
.
Transmittal Form
INTEQ
To: AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention: Helen Warman
Reference: lC-08Ll & lC-08LlOl
.
"1_
BAKER
HUGHES
Anchorage GEOScience Center
1
.:;:>-
ëi)'
t.,
"';"
1"
C,
J>
f<"'c::
?: c;:;r. Ç;-}
!')-, ~ ~-
:r ,.-
ø n
ä; g h~
~ ;"
f".'
=
C:I f':"-:>
Q O"!
'4,
3;
¡;"
1;,..,
õ'
.:::1
Contains the following:
2 LDWG Compact Disc
(Includes Graphic Image files)
2 LDWG lister summary
2 bluelines - MPR-DIR _ md Log
2 bluelines - MPR-DIR_tvd Log
LAC Job#: 726009
Sent By: Cosetta Todirica
Re<eived By: C- __~-----
~rì"Jr/tfA. r¿ fhdtu,d( ef/1
Date: August 17, 2006
Date: ?i/f);¥O C-J
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
~ ~c.{ - fl ,
1'10'1(:)
Baker Hughes INTEQ
7260 Homer Drive
Anchomge, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
?~
{}ð# -lid I 8D~1- It () "0
;it ì t.( D3JÇ; 11../ ~
r~::';~:=1
. ','I ...,
, ,·r' ....,
... '.'\ ...'
_.._.___u_.__~_~___..__._n_._.
_... _ u ."., ,...~
>..~ .". .... . ..
." ". ..~.
.,..·.·M,:.',
_'Ie .... .. ... "'..:;
.."...~" ....".-~
~u I
rn
()
m
?
'1110"""
f11
o
......
....., ~.". .....
__u._._.___.~.______..__.__.
"'C:"",",,'.'''
....", - ... .. "'to'.
....". .~..~ .
-+---~-----~---------~
¡_HJJI¡d
:~
. (
I
bp
.
.
~..
,\If.'''.
--,~ ~..-
,,- ~..""'"
*."\ ~,..
·'jJJ'~~I\'"
".
~ -
J .. ~
Terrie Hubble
Technical Assistant
GPB Drilling & Wells
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
September 15, 2004
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Reference: Permit to Drill, *..:1'41, 204-112
Direct: (907) 564-4628
hubbletl@bp.com
To Whom It May Concern:
In addition to the attached Completion Reports for 1 C-08L1 and 1 C-OSL1-01, I am also submitting the As-
Built on record for 1 C-08. It came to our attention that the surface location for this series of wells was
incorrectly reported in the past. The two Completion Reports now being submitted match what is in our
databases and the As-Built.
Thank you very much for your assistance in this matter.
Sincerely,
~~~-
Terrie Hubble
I STATE OF ALASKA .
ALASKA IL AND GAS CONSERVATION COM~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
No. of Completions
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
CASING, liNER AND CEMENTING RECORD
SrnINGDÊP'THMD SrnINGDEP'tHTVD
BoTTOM BOTTOM
80' Surface 80'
2714' Surface 2587'
8933' Surface 6438'
10725' 6506' 6546'
(9725') (6269') (6506')
o GINJ 0 WINJ 0 WDSPL
2. Operator Name:
Conoco Phillips Alaska Inc.
3. Address:
clo P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
1240' SNL, 660' EWL, SEC. 12, T11N, R10E, UM
Top of Productive Horizon:
1147' NSL, 4101'WEL, SEC. 02, T11N, R10E, UM
Total Depth:
2602' NSL, 5246' WEL, SEC. 02, T11 N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 561664, y- 5968993'" Zone- ASP4
TPI: x- 556882 y- 5971343 Zone- ASP4
Total Depth: x- 555725 - y- 5972789' Zone- ASP4
- -
18. Directional Survey 181 Yes 0 No
21. Logs Run:
GR, RES
22.
16" 65# H-40
10-3/4" 45.5# K-55
7" 26# K-55
2-7/8" 6.5# L-80
(3-3/16" x 2-718") (6.2# I 6.4#) (L-80)
Surface
Surface
Surface
9725'
(8713')
23. Perforations open to Production (MD + TVD of To,e and
Bottom Interval, Size and Number; if none, state' none"):
2-7/8" Slotted Section
MD TVD MD TVD
9771' - 10723' 6506' - 6546'
26.
Date First Production:
August 27, 2004
Date of Test Hours Tested PRODUCTION FOR
8/28/2004 12 TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .-...
Press. 523 1355 24-HoUR RATE-"
OIL-BsL
483
One Other
5. Date Comp., Susp., or Aband.
8/13/2004
6. Date Spudded
8/112004
>'
7. Date T.D. Reached
8/6/2004 ¡/
8. KB Elevation (ft):
94'
9. Plug Back Depth (MD+ TVD)
10954 + 6556
10. Total Depth (MD+TVD)
,,10954 + 6556 >
11. Depth where SSSV set
1806' MD
19. Water depth, if offshore
NIA MSL
RECEIVED
SEP 1 52004
Alaska Oil & Gas ('tAn° C "
1b. Well Class: w". ønm)'~SlJn
181 Developmen~~~atory
o Stratigraphic 0 Service
12. Permit to Drill Number
2(M.o111
13. API Number
50- 029-20585-60-00
14. Well Name and Number:
KUP 1C-08L 1
15. Field I Pool(s):
Kuparuk River Field 1 Kuparuk
River Oil Pool
Ft
Ft
16. Property Designation:
ADL 025649
17. Land Use Permit:
20. Thickness of Permafrost
1650' (Approx.)
7"/ w.-i...d,-u e. '150;#"1 Þ
bV3~TV()
YJ
~.
~
36" 425 sx Arcticset "
13-3/4" 3125 sxArcticset (I
8-3/4" 974 sx Arcticset "
4-1/8" x 3-3/4" Uncemented Slotted Liner
4-1/8" x 3-3/4" (Uncemented Slotted Liner, L 1-01)
SIZE
4-1/2", 12.6#, L-80
DEPTH INTERVAL (MD)
8930'
8615'
DEPTH SET (MD)
8823'
PACKER SET (MD)
8639'
AMOUNT & KIND OF MATERIAL USED
Set Whipstock
Freeze Protect with Diesel
None
St~ 2 1
ORIGINAL
COM P'LC7:¡Õ-¡~-''':;
. DATE '
~!!!:~!.
vt:¡.u¡-n-¡,
·7Þ:...~·
~-
.'. . .... "'''',....".-<J
GAs-McF
64
W A TER-BsL
563
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
OIL-BsL
242
GAs-McF
128
W A TER-BsL
1127
CHOKE SIZE I GAS-OIL RATIO
25 266 scf/stb
OIL GRAVITY-API (CORR)
19°
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
æ-- [~fl"
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
~v
&
2~.
e
GEOLOGIC MARKERS
29.
e
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Kuparuk C3
8980'
6471'
None
Kuparuk C3
9475'
6501'
Kuparuk C1
10435'
6530'
RECEIVED
SfP 1 5 2004
Alaska Oil & Gas Cons. Commissìon
Anchorage
30. list of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowtedge.
Signed Terrie HUbble~AI\i.i Uuß6ee Title Technical Assistant Date ()q-/S-OC¡
KUP 1 C-08l 1 204-111 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Dan Kara, 564-5667
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injec::tion, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely se!regated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this we,ll should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
It
e
Well:
Field:
API:
Permit:
1 C-08L1 / L1-01
Kuparuk River Field
50-029-20585-60-00/-61-00
204-111 / 204-112
Accept:
Spud:
Release:
Rig:
07/29/04
08/01/04
08/13/04
Nordic #2
PRE-RIG WORK
07/24/04
PULLED BALL & ROD, RHC PLUG @ 8781' RKB. PULLED SO V & SET DV @ 8660' RKB. MITIA 2500
PSI, GOOD. RECOVERED 250 BBL 10.25# BRINE.
INJECTED A CAC03 PILL INTO THE PERFS FOR FLUID LOSS CONTROL DURING THE COILED
TUBING SIDETRACK PROGRAM. NO SIGNIFICANT PRESSURE INCREASE DURING THE
PUMPING STAGES. PUMPED 4,800# OF CAC031N 40 PPTG HEC. 20 SACKS OF SAFECARB 10,
38 SACKS OF SAFECARB 40, AND 38 SACKS OF SLUGGITS CM. INITIAL PUMP RATES OF 5.5
BPM AS PILL ENTERED INTO PERFS LOWERED RATE TO 3.3 BPM. LAST 12 BBLS OF PILL RATE
= 1 - .5 BPM. AFTER CLEARING TUBING OF PILL SHUT PUMPS DOWN ALLOW FILL TO SETTLE
FOR WIRELlNE TAG IN THE MORNING.
07/25/04
GAUGED TBG TO 2.79", TAGGED @ 9040' RKB. LOGGED PDS CSGfTBG CALIPER FROM 9030' TO
8360' RKB, DATA GOOD. INJECTIVITY TEST: 0.5 BPM @ 800 PSI, 1 BPM @ 1400 PSI. DRIFTED
TBG W/ DUMMY WHIPSTOCK (19' X 3.65") TO 9040' RKB, NO PROBLEM.
07/26/04
RIH. CLEANOUT CALCIUM CARBONATE AND FILL TO 9150' CTM. POOH. BULLHEAD 35 BBLS
DIESEL FREEZE PROTECT. PERFORM INJECTIVITY TEST (1 BPM @ 900 PSI WHP). RDMO.
TAGGED SAND TOP @ 9153' RKB, GOOD.
07/28/04
PRESSURE TEST TO 3500 PSI ABOVE MASTER AND SWAB - BOTH VALVES TESTED GOOD. SET
BAKER HUGHES 4.5" X 7" GENERATION II WHIPSTOCK IN 7" CASING AT 8930 (CORRELATED
DEPTH TO SWS BHCS DATED 25 APRIL 1981). PLACED (3) RA TAGS IN WHIPSTOCK 10' FROM
TOP - FINAL DEPTH OF RA MARKER WAS 8940'. WHIPSTOCK WAS SET WITH FACE ORIENTED 5
DEG RIGHT OF HIGH SIDE LOOKING DOWNHOLE. DID NOT TAG TO. WELL LEFT SHUT IN.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
7/28/2004 21 :00 - 00:00 3.00 MOB P PRE 2004 Maintenance finished
Back rig out onto Spine at Z Pad corner. Start move to
Kuparuk and nearing Milne pt cutoff at midnite
7/29/2004 00:00 - 01 :30 1.50 MOB P PRE Continue move to 1 C Pad
01 :30 - 03:15 1.75 MOB P PRE Just past MPU junction and had to remove 2 inner bogie tires
after crossing rig mats
03:15 - 14:30 11.25 MOB P PRE Resume move to 1C Pad. Rig on location at 1045 am. Begin
RU. Set rig mats around well head. Verify 1C-12 is shut in at
surface. Place BOPS in cellar and hook up hydraulic lines.
Move over well. Accept rig at 1430 on 7-29-04.
14:30 - 19:00 4.50 BOPSUF P PRE NU BOPS. Level rig. Install 2-3/8" E-CT. Spot mise
equipment
19:00 - 20:15 1.25 MOB P PRE Walkthru w/16 members of Kuparuk Emergency Services
20:15 - 21 :30 1.25 BOPSUF P ¡PRE Resume NU BOPE. Spot cuttings box. Fill pits w/ 9.0 ppg
milling fluid (used FloPro mud)
Function test rams
21 :30 - 23:00 1.50 BOPSUF N SFAL PRE Body test BOP to 4500 psi and leaked at 3" slip ram door.
Replace seals and retest
23:00 - 00:00 1.00 MOB P PRE Prespud mtg wI rig personnel
7/30/2004 00:00 - 01 :30 1.50 MOB P PRE Load BHI tools into pipeshed. Fin plumb DaD choke. Install
hardline in reel house. APC plumb hardline to tiger tanks
01 :30 - 07:30 6.00 BOPSUP P PRE BOPE test to 4500 psi. Witness waived by AOGCC, C.
Scheve. E-mail all data to AOGCC.
07:30 - 08:30 1.00 RIGU P PRE SPot KWF upright behind cuttings tank. Berm and load same
with 10.5 ppg brine. Round up slickline components for
deployment system. Complete pad inspection with DSO.
08:30 - 09:30 1.00 RIGU P PRE Hold A TPIPre spud review with day crew in ops cab. Discuss
importance of all aspects of HSE, particularly with new
operations and pressure deployment proceedures. Discuss
objectives and details of well plan. Review DOCTD operations,
new choke schedule.
09:30 - 10:30 1.00 RIGU P PRE Install ESD valve on rig floor for 1C-12 well. Review SSSV
panel operations with drill site tech with all hands. Close sssv.
Bleed well. Zero WHP, sssv holding.
10:30 - 14:30 4.00 RIGU P PRE MU 4-1/16" deployment lubricator. RU slickline unit and tools.
Change packott. Hang lubricator in blocks. Test gen set
loading while MU pressure deployment equipment.
14:30 - 15:30 1.00 RIGU P PRE Hold table top deployment exercise in ops cab with day crew.
Review steps and make preliminary changes to reflect big tool
BOP configuration.
15:30 - 15:45 0.25 RIGU P PRE Pressure test lubricator to 1500 psi with water.
15:45 - 17:30 1.75 RIGU P PRE Practice pressure deploy full resistivity MWD & motor. Able to
fit 82' BHA into combination lubricator & well bore, above closed
master valve. Set in slips. Close VBR's. Unstab lubricator.
Verify ball valve can be accessed. Stab back on well.
17:30 - 18:10 0.67 RIGU P PRE Practice un-deploy BHA.
18:10 - 18:20 0.17 RIGU P PRE Safety mtg re: plan ahead
18:20 - 19:30 1.17 RIGU P PRE RU hoses to injector and general preps to rig floor. Remove bit
and motor, install tree cap
19:30 - 20:45 1.25 RIGU P PRE Hands practice using Swaco choke while circulating over the
top. Find that DS monitor has a short, will fix in am (when tech
p can get across Kup bridge)
20:45 - 21 :20 0.58 RIGU PRE Table top mtg on deploy/undeploy procedure
Printed: 8/16/2004 8:58:22 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
7/30/2004 21 :20 - 21 :35 0.25 RIGU P PRE Open master and check well for pressure above closed
TRSSSV-none
21 :35 - 23:30 1.92 RIGU P PRE Practice pressure deploy/undeploy wi full BHA. LD BHA tools,
standback lubricator
23:30 - 00:00 0.50 RIGU P PRE Set injector on well. Install packoff
7/31/2004 00:00 - 02:30 2.50 RIGU P PRE Install gooseneck and fin prep injector. Pull CT off reel and
stab. RD tools
02:30 - 04:00 1.50 RIGU P PRE Install temporary CTC. Stab onto well. Fill CT wi used mud
system. Got another 'strawberry shake' back initially, then
returns cleaned up (CT had been blown down wi N2 and rusted
inside for a couple weekslunknown concentration of Flo Lube in
used mud, but probably was same system from L2-21 . . .)
PT flowpath at 4000 psi. Reverse slack back at 3.4/3400
04:00 - 04:30 0.50 RIGU P PRE Cut off 66' CT to find wire
04:30 - 05:00 0.50 RIGU P PRE Install CTC. PT 35k
05:00 - 07:00 2.00 RIGU P PRE Rehead BHI
07:00 - 07:30 0.50 RIGU P PRE Test weight cell on injector.
07:30 - 10:00 2.50 STWHIP P WEXIT Install one 2' and two 3' lubricators under injector (for ball valve
space out). MU Baker/lnteq milling assembly (3.8" one step &
string reamer wI straight motor).
Stab coil. Get on well. Test MWD - ok.
10:00 - 10:45 0.75 STWHIP P WEXIT RIH. Zero WHP with SSSV closed.
10:45 - 11 :00 0.25 STWHIP P WEXIT Stop at 1600'. Pressure well to 700 psi. Well began taking
fluid. Pump sssv open.
11 :00 - 12:15 1.25 STWHIP P WEXIT RIH taking returns to tiger tank. Follow PWD pressure
schedule while RIH to maintain constant BHP (3450 psi at
8900')
12:15 - 13:45 1.50 STWHIP P WEXIT Circulate well to milling fluid (9.0 ppg flo pro). Pump 40 bbls hi
vis clean pill. 1.38 inl 1.21 out with 240 psi whp. Increase rate
to 2.0 with zero whp. 1:1 rtns.
Pill to bit. Shut in well and inject pill at 1.0 bpm @ 360 psi.
Close in well to close ECD on mwd. WHP static at 360 psi.
13:45 - 14:15 0.50 STWHIP P WEXIT Tag WS at 8956' dry (uncorrected). PU and circulate. 2.65
bpm in/1.75 bpm out. Losing too much fluid to continue. Lots
of extra formate on location, but no inexpensive milling fluid.
Call for trucks to get seawater from KRU and more used flo-pro
from Deadhorse.
14:15 - 15:45 1.50 STWHIP N DPRB WEXIT Shut in well wi 390 psi. Order used flopro, LCM and additional
biozan from Deadhorse. Order seawater from KRU. Wait on
fluid.
15:45 - 17:00 1.25 STWHIP P WEXIT Milling window. 2900 psi @ 2.54 in/2.03 out. 36K# up, 12k#
dn wt. ECD: 10.65 ppg. Top of WS at 8930' e-line setting
depth. Tag WS pinch point at 8934.6'. Paint orange flag at
pinch point. Losses slowly healing.
Start milling at 0.1' per 5 minutes.
2.53 in/2.77 out. Increase WHP to 90-100 psi. 2.53 in/2.43
out.
17:00 - 18:30 1.50 STWHIP P WEXIT Continue milling window at 8935.73. Holding 350 psi whp.
DHP:3461 psi @ 2.32 in/2.35 out.
18:30 - 19:15 0.75 STWHIP P WEXIT 8936.9' 2.7/2.7/2840/320 ECD 10.5=3462 DHP, PVT 198
19:15-21:00 1.75 STWHIP P WEXIT 8937.5' PUH 32k to chk FS and zero BHI WOB
Resume milling 2.7/2.7/2700/300/3456 ECD 10.53 wi fluid
density of 8.7+ PVT 198
Printed; 8/16/2004 8;58;22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
7/31/2004 21 :00 - 00:00 3.00 STWHIP P WEXIT 8940.0' at calc BOW 2.7/2.7/2700/290/3445 w/ 100 psi ditt,
ECD 10.48, 1.2k wob, PVT 198 and appears that this is also
the true BOW based on getting string wt back. Get SR thru
window after 1.5 hrs, then drill formation at 3'/hr to 8944', PVT
198
8/1/2004 00:00 - 00:55 0.92 STWHIP P WEXIT Drill rathole from 8944-50' at 6'/hr PVT 198 No stalls thruout
window milling
00:55 - 01 :50 0.92 STWHIP P WEXIT Backream and ream window, clean. Dry tag, clean w/ 524 psi
static, 3458 psi DHP 32k, 12k. Open EDC
01 :50 - 03:20 1.50 STWHIP P WEXIT POOH following pressure schedule. Close TRSSSV at 1500'.
Check for flow at 500'. Close EDC. POOH
03:20 - 04:00 0.67 STWHIP P WEXIT LD milling BHA. Mill had center wear and gauged 3.80", 3.79"
NG
04:00 - 04:50 0.83 STKOH P PROD1 MU build assy
04:50 - 06:45 1.92 DRILL P PROD1 RIH w/ BHA #2 (3.0 deg, HCC bi bit) w/ closed choke until
pressure stabliized at 560 psi. Open TRSSSV. RIH using
pressure schedule
06:45 - 07:30 0.75 DRILL P PROD1 Log initial GR tie in from 8820' to 8915' using geo's PDC log.
-19' correction. RIH.
07:30 - 08:30 1.00 DRILL P PROD1 RIH. Tag TD at 8952'. 32k# up, 14k# dn wt
Begin displacement to 9.0 ppg formate flo-pro.
Drill ahead. 2800 psi fs @ 2.6 in/out. 200-400 dpsi mtr work.
WHP:320 psi. ECD: 10.56 ppg/3465 psi BHP. TF:10L. ROP:
30-50 fph. WOB: 1.5-2.5K#
Reduce whp as 9.0 mud displaces coil annulus.
08:30 - 10:30 2.00 DRILL P PROD1 Drill ahead. Choke full open, WHP 33 psi. BHP:3476 psi,
ECD: 10.56 ppg (450-500 psi incremental over static bhp) with
9.0 ppg mud all the way around.
Circ rate: 2.51 in/2.36 out @ 2800 psi fs.
Complete build. Estimate inc at bit: 90 deg.
10:30 - 12:30 2.00 I DRILL P PROD1 Wiper trip back to window. Make two passes through 7". Circ
OOH at full rate as per BHP schedule.
12:30 - 14:45 2.25 DRILL P PROD1 At surface. Get ott well. Unstab coil. LD BHA. HTC bi-center
had several broken gauge cutters and one broken nose cutter.
Grade:2-3-0.
MU resistivity BHA assembly with 1.5 deg mtr & HCC bi-center.
Stab coil. Get on well. Test MWD.
14:45 - 16:30 1.75 DRILL P PROD1 RIH to SSSV. Pressure well to 535 psi. Open sssv. Continue
to RIH. Adjust whp to maintain constant BHP as per schedule.
16:30 - 17:00 0.50 DRILL P PROD1 Correct -15' to white flag. Log gr tie in from 8860' to 8902'.
Add 2' correction.
17:00 - 17:15 0.25 DRILL P PROD1 RIH to TD.
17:15 - 18:30 1.251 DRILL P PROD1 Drill ahead. 3050 psi @ 2.53 in/2.45 out. Resistivity doesn't
appear to be working-will log later
18:30 - 19:00 0.50 DRILL P PROD1 Drill ahead wI open choke 2.75/2.52/3200/110R ECD 10.75,
DHP 3572,100-250 psi ditt, 0-1k wob @ 91 deg
Revised depths to geo's PDC log are TOWS 8928', TOW
8932.6', BOW 8938.0', RA 8938.0'
19:00 - 19:20 0.33 DRILL P PROD1 Wiper to window, clean
19:20 - 20:15 0.92 DRILL P PROD1 Drill ahead wI open chole 2.51/2.30/3080/90L ECD 10.78, DHP
3582, 100-250 psi ditt, 0-2k wob @ 91 deg PVT 282
20:15 - 20:35 0.33 DRILL P PROD1 Stacking, wiper to window PVT 270
20:35 - 22:00 1.42 DRILL P PROD1 Drill ahead wI open choke albiet slowly and w/ a few stalls and
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/112004 20:35 - 22:00 1.42 DRILL P PROD1 lower losses after solids from wiper got to surface
2.56/2.50/3200/120L ECD 10.71, DHP 3560 PVT 255
Penetration rate increased at 9410' as did returns to 2.56/2.63.
Increase pump rate w/ open choke to compensate
2.7/2.65/3240/60R ECD 10.79 DHP 3582-appears we are right
on the edge of balance wi open choke at drilling rate. Solids in
annulus and pump rate determine the loss rate since just
before wiper 2.7/2.4 ECD 10.84 DHP 3608 PVT 244
22:00 - 22:35 0.58 DRILL P PROD1 Wiper to window. PUH thru window and recip twice to EOT to
flush any solids to surface and 'out' density incr to 9.30 ppg vs
9.05 ppg clean PVT 224
22:35 - 23:50 1.25 DRILL P PROD1 Drill ahead wi open choke 2.7/2.6/3250/80R ECD 10.8 DHP
3590 at 90 deg at 6406' rvD PVT 200
23:50 - 00:00 0.17 DRILL P PROD1 Wiper to window (while fix CTDS which locked up, and then
BHI screen. . .)
8/2/2004 00:00 - 00:40 0.67 DRILL P PROD1 ' Finish wiper to window, clean. Tie-in to RA pip, no correction.
Wiper to TD, clean PVT 189
00:40 - 01 :50 1.17 DRILL IP PROD1 Drill ahead 2.73/2.70/3260/90L ECD 10.8 DHP 3590 and are
not getting required turn to stay in polygon. Drill to 9728'. With
12* DLS will cross intersection of fault (at 60 deg) and top E/W
polygon line and exit polygon (will cut the corner). Discuss wi
geo's and will drill ahead
01 :50 - 02:35 0.75 DRILL P PROD1 Wiper to window, clean PVT 178
02:35 - 03:50 1.25 DRILL P PROD1 Drill ahead 2.73/2.73/3270/100L ECD 10.82 DHP 3603 at 88
deg looking for the fault. Penetration rate decrease and
corresponding GR increase at 9920' must be the start of it.
Start adding fresh mud. Drill to 10000' and need to see about
20' more on the GR
03:50 - 04:00 0.17 DRILL P PROD1 100' wiper was clean
04:00 - 04:15 0.25 DRILL P PROD1 Drill ahead 2.7/2.6/3380/115L ECD 10.89 DHP 3629 at 6427'
TVD and 87 deg to 10020'
04:15 - 04:45 0.50 DRILL P PROD1 Wiper to window. Slow recip in 7". Park in 7" and SD pump to
check static pressure of 320 psi. Open EDC
04:45 - 06:30 1.75 DRILL P PROD1 POOH folllowing pressure schedule @ 2.7 bpm. At surface.
Run back in hole to 100'. Circ back to surface.
06:30 - 08:30 2.00 DRILL P PROD1 Get off well. Unstab coil. LD BHA. HCC bicenter in good
condition: 1-1-0.
Swap out resistivity tools. Re-calibrate HOT.
MU BHA in well.
Stab coil. Test MWD. Get on well.
08:30 - 11 :00 2.50 DRILL P PROD1 RIH. Maintain constant BHP using drilling choke. Open sssv.
Continue in hole.
11:00-11:15 0.25 DRILL P PROD1 Log gr tie in from 8850'. (No flag) -15' correction.
11:15-11:45 0.50 DRILL P PROD1 Circulate in hole maintaining drilled TF.
11 :45 - 13:25 1.67 DRILL P PROD1 Drill ahead. 3200 psi fs @ 2.66 in/2.57 out. 200-400 dpsi.
Tf:75r Inc:82 deg WOB:2k-4k#. ROP:20 - 150 fph.
ECD:10.77ppg/3594 psi @ 6440' TVD. Pvt:422 bbls
13:25 - 17:25 4.00 DRILL N DFAL PROD1 MAD pass up 300'/hr to 8975'
17:25 - 18:00 0.58 DRILL N DPRB PROD1 RIH to 10147' and set down. Pick up heavy. Work to get back
down and losing ground
18:00 - 18:30 0.50 DRILL N DPRB PROD1 Backream to 9900' 29k. RIH reaming 2.6/2.4 at 20'/min and
get to 10090' and stack out at drilled TF. PUH 70k and 20k
overpulls to 10050'-this is not where we want to go
Printed: 8/16/2004 8:58:22 AM
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/2/2004 18:30 - 20:00 1.50 DRILL N DPRB PROD1 Wiper 2.6/2.4/3250 ECD 10.8 DHP 3588 while circ up sample
I and discuss. Recip in 7"
20:00 - 21 :45 1.75 DRILL N DPRB PROD1 POOH following pressure schedule at 2.6 bpm while woo.
Close TRSSSV
21 :45 - 22:30 0.75 DRILL N DPRB PROD1 LD drilling BHA
22:30 - 23:15 0.75 DRILL N DPRB PROD1 WOO
Discuss wI town team and decide the plan ahead. Will use OH
WS and kickoff HS. Kuparuk River Bridge is closed 6 pm to 6
am for upgrades and no WS's on this side of river-will test
BOP's in the meantime
23:15 - 23:30 0.25 DRILL P PROD1 Safety mtg re: plan ahead/BOP test
23:30 - 00:00 0.50 BOPSUP P PROD1 Test BOPE to 4500 psi. Witness waived by AOGCC
8/3/2004 00:00 - 05:00 5.00 BOPSUPP PROD1 Continue BOPE test
05:00 - 07:00 2.00 STKOH X DPRB PROD1 WOWII OHWS
07:00 - 09: 15 2.25 STKOH C PROD1 MU 3.75" OH aluminum WS billet on e-coi/.
09:15-11:15 2.00 STKOH C PROD1 RIH. Open SSSV. Continue in hole at 80 fph.
11:15-11:35 0.33 STKOH C PROD1 Log gr tie in from 8850' and no carr
11 :35 - 12:00 0.42 STKOH C PROD1 RIH to 9550', clean. PUH 31 k to set depth at 9539.8' at bottom
of tool. Close choke and trap 270 psi while close EDC. Static
WHP rose to 296 psi at 3522 DHP showing 10.53 ECD
12:00 - 12:10 0.17 STKOH C PROD1 Pressure up to 4534 psi and ball seat sheared. PUH 31 k
leaving top of billet at 9525'
12:10 - 12:30 0.33 STKOH C PROD1 POOH at 30'/min thru OH
12:30 - 14:15 1.75 STKOH C PROD1 Open EDC. POOH following pressure schedule @ 2.1 bpm.
Return mud was foamy and cut to 8.22 ppg, but gradually
returned to 9.0 ppg. Close SSSV. Close EDC
14:15 - 14:45 0.50 STKOH C PROD1 LD WS setting tool
14:45 - 16:20 1.58 STKOH C PROD1 LD BHI tools and test. MU drilling assy
16:20 - 18:00 I 1.67 STKOH C PROD1 RIH w/ BHA #6 (3.75" R335C, 1.5 deg, res). Open SSSV to
I 560 psi. RIH following pressure schedule @ 0.5 bpm
18:00 - 18:25 0.42 STKOH C PROD1 Log gr tie in from 8830' -2' correction
18:25 - 18:45 0.33 STKOH C PROD1 RIH tag top of OHWS at 9528'.
18:45 - 20:15 1.50 STKOH C PROD1 PU and orient TF to 335. Time drill ahead f/9528' to 9531'
2.63/2.5/3685 ECD 10.78 DHP 3683 at 6407' rvD
20:15 - 21 :15 1.00 DRILL C PROD1 Drill ahead f/9531' to 9581' then hit siderite stringer.
21:15 - 00:00 2.75 DRILL C PROD1 Drilling siderrite stringer from 9581' to 9590'. 2.712.63450fs
ECD 10.723580 BHP Drilled at 95L. Turned up to 20L in an
attempt to drill out of siderite.
8/4/2004 00:00 - 00:30 0.50 DRILL C PROD1 Continue with the attempt to drill out of siderite stringer from
9590'. No progress made. Good motorwork 5-600psi and
weight transfer.
00:30 - 02:20 1.83 DRILL C I PROD1 TOH following pressure schedule to 8863'. Open EDC flush 7"
and continue TOH to above SSSV. Close SSSV trapping
525psi bleed off above valve and TOH to surface.
02:20 - 02:45 0.42 DRILL C PROD1 Change out bits. Bit #5 had 3 of the 6 blades broken off. Check
scribe marks on tools.
02:45 - 04:30 1.75 DRILL C PROD1 RIH to 850' ramp up pressure to 550psi to open flapper then
actuate opening sequence on SSSV. Continue RIH
04:30 - 04:50 0.33 DRILL C PROD1 Log tie in at RA -23' correction.
04:50 - 05:15 0.42 DRILL C PROD1 RIH. Res tool quit at 9250'. Continue on. No back-up tools
available on Slope or Anchorage. RIH past OHWS at 30L no
problems go to 9575'.
105:15 - 05:30 I 0.25 DRILL C PROD1 Wash/ream from 9575' to TD 2.69/2.61 3290fs 3550 BHP 10.7
[
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/412004 05:15 - 05:30 0.25 DRILL C PROD1 ECD
05:30 - 06:20 0.83 DRILL C PROD1 Directionally drill ahead fl 9590' purposely going slow first
several feet. Drill to 9593'. Increase WOB to 1.5k drilling off
better by 9595'. Increase pump 2.85/2.80 pinching off on choke
to maintain slightly greater loss 2.73/2.61 good ROP by 9597
3670bhp 10.75 ECD, but ground to a halt at 9616' w/4k wob.
No stalls (no indication of junk)
06:20 - 06:50 0.50 DRILL C PROD1 Wiper to above OH WS. Had overpull and MW at TOWS.
Work to revive res tool in 4-1/8" hole and appears to work. RIH
by OH WS at red rate, clean at 30L. Backream slowly above it
and was clean. RIH by OH WS at red rate, clean
06:50 - 07:05 0.25 DRILL X DFAL PROD1 Log MAD pass down from 9555' to capture missed data
07:05 - 08:00 0.92 DRILL C PROD1 Drill ahead at 20'/hr and sharp stall at 9619'. Work thru this
spot and then penetration rate picked back up to normal for this
interval-assume we are out of it. Drilled to 9675' and had
another sharp stall and progress slowed to zero for a while wI
4.2k wob, but then picked up
08:00 - 08:35 0.58 DRILL C PROD1 Drill ahead 2.72/2.62/3450/70L w/100 psi whp, 3630 DHP, ECD
10.9 100'/hr until started stacking
08:35 - 09:25 0.83 DRILL C PROD1 Wiper to window. Clean thru out OH and by OH WS
09:25 - 11 :20 1.92 DRILL C PROD1 Drill ahead 2.64/2.53/3430/70R wI 100 psi whp, 3634 DHP,
ECD 10.9 to 9900' Open choke to full open since it appears we
are charging up formation 2.73/2.71
11 :20 - 12:15 0.92 DRILL C PROD1 Wiper to window was clean to 8963'. Stalled motor, pulled tite.
RBIH, free. Try it again and came thru window, clean. Recip
in 7" to cleanout cuttings
12:15 - 13:00 0.75 DRILL C PROD1 Log tie-in down from 8860'. Corr -39' (explains overpull . . . it
was the window). Park at 8884' and SD pump. Check CT
footage counter on injector and found a loose bolt. Static whp
385, DHP 3491 showing 10.74 ECD
13:00 - 13:30 0.50 DRILL C PROD1 RIH thru window, clean. Wiper to TD tagged at 9898', clean
13:30 - 15:10 1.67 DRILL C PROD1 Drill ahead 2.5/2.5/3240/80L wI open choke, DHP 3580, ECD
10.73 to 9920' and start stacking at 9895' which is probably
the first shale at 9920' in PB 1. Continue drilling ahead and had
more stacking-need new mud
15:10-16:05 0.92 DRILL C PROD1 Wiper to window was clean. Start new mud while RIH
16:05 - 17:30 1.42 DRILL C PROD1 Drill ahead 2.59/2.57/3350/90R wI open choke, DHP 3610,
ECD 10.87 Back in higher GR at 10080'. Have 10k overpull
on pickup at 10135'
17:30 - 18:45 1.25 DRILL C PROD1 Drill ahead from 10135' to 10190'.
18:45 - 19:45 1.00 DRILL P PROD1 Wiper to window. Flushed 7" annulus. Wi[per to bottom hole in
good shape.
19:45 - 22:15 2.50 DRILL P PROD1 Drill ahead fl 10190' 2.80/2.823580 DHP 10.79 ECD.
9.0/9.0MW (new mud) Adjust choke to maintain 100whp
2.76/2.65 2-3k wob 150-200'/hr. Drill to 10340'.
22:15 - 23:00 0.75 DRILL P PROD1 Wiper back to window. Tight between 10170'-10120'
23:00 - 23:15 0.25 DRILL P PROD1 Log tie-in 0 correction
23:15 - 00:00 0.75 DRILL P PROD1 Wiper back to bottom
8/5/2004 00:00 - 00: 15 0.25 DRILL P PROD1 Finish making wiper trip to bottom. Minor amount of motor work
starting at 10050'. Slight setdown at 10212' recovered easily
and continue to bottom.
00:15 - 03:50 3.58 DRILL P PROD1 Drill ahead f/10340' 2.8/2.74 maintaining 100 psi at the choke
3654 DHP 10.98 ECD ROP slowed to 15'/hr starting at 10355'
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/512004 00: 15 - 03:50 3.58 DRILL P PROD1 to 10385' picked up again unti/10438' then hit another wall.
Ratty drilling to 10450' then lost contact with orientor.
03:50 - 06:15 2.42 DRILL N DFAL PROD1 TOH following pressure schedule to 8863'. Open EDC flush 7"
and continue TOH.
06:15 - 08:55 2.67 DRILL N PROD1 Change bit and orientor. Check motor. Bit was 1-4-1 wi two
chipped cutters on the taper and 3 of 4 backcutters missing
(due to tagging the window)
08:55 - 10:30 1.58 DRILL N PROD1 RIH wi BHA # Pressure well bore to 560 psi and open SSSV
10:30 - 10:55 0.42 DRILL N PROD1 Log tie-in down from 8860', corr +2'
10:55 - 11:20 0.42 DRILL N PROD1 Wiper, clean to 10088' 2.45 bpm holding 150 psi whp, 3660
DHP, ECD 11.0
11 :20 - 12:20 1.00 DRILL N PROD1 Set down at 10088', 10147',10139', 10132'. Wiper up hole and
10k overpull at 10120'. Set down at 10178',10165',10258,
10280',10265',10290',10345' w/5-15k overpulls. RIH to TD
tagged at 10453'
12:20 - 12:45 0.42 DRILL N PROD1 Backream to 10050' @ 20'/min was relatively clean
12:45 - 13:20 0.58 DRILL N PROD1 Ream to TD 10-20'/min with set downs at 10181' and 10431'
13:20 - 14:55 1.58 DRILL P PROD1 Drill ahead 2.72/2.67/3450/60R holding 100 psi bp to hold 3650
DHP, 11.0 ECD. Reduce backpressure in 20 psi stages based
on inlout rate and DHP. Swap to left at 10540'. Drill to 10600'
2.72/2.72 w/ 60 psi bp 3660 DHP 10.94 ECD PVT 245
14:55 - 15:40 0.75 DRILL P PROD1 Wiper to window, clean!
15:40 - 15:55 0.25 DRILL P PROD1 Log tie-in down to RA pip wI well Sf 580 psi whp, 3620 psi
DHP, add 1.0'
15:55 - 17:00 1.08 DRILL P PROD1 Wiper to TD and set down on OH WS at 9526' (orientor rolled
just before going by). Rest of hole was clean until set down at
10540' (TF change area). Appears 3650 psi DHP (11.0 EMW)
will control shales
17:00 - 18:30 1.50 DRILL P PROD1 Drill ahead 2.64/2.64/3430/90L wi 70 psi bp, 3660 DHP, 10.96
ECD, PVT 216 Drilled to 10750'.
18:30 - 21: 15 2.75 DRILL P PROD1 Wiper trip back to window, 5k overpulls fl 10250'- 10230' RIH
setdown at 985' p/u and work area RIH other setdowns at
10160, 10433', 10510' mostly due to TF angles. After p/u and
adjustment to TF RIH without too much further trouble. Liner
should pass these areas better.
21 :15 - 00:00 2.75 DRILL P PROD1 Drill ahead. 3350fs 2.5/2.45 3670 DHP with 90psi WHP
11.0ECD Drilled to 10880'
8/6/2004 00:00 - 01:10 1.17 DRILL P PROD1 Continue drilling ahead II 10880' to 10950' 2.62/2.54 w/85psi
whp 10.98 ECD 3675 DHP
01:10 - 03:20 2.17 DRILL P PROD1 Wiper trip above window. Cleanout 7" annulus. RIH
03:20 - 03:35 0.25 DRILL P PROD1 Log tie-in +5' correction.
03:35 - 04:45 1.17 DRILL P PROD1 Wiper to bottom. setdown at 10470' readjust TF and went
through good to bottom at 10954'.
04:45 - 07:45 3.00 DRILL P PROD1 TOH for liner. Paint flag at 8000', open EDC. Follow pressure
schedule at 2.8 bpm. Close SSSV
07:45 - 08:30 0.75 DRILL P PROD1 LD drilling BHA
08:30 - 08:50 0.33 CASE P RUNPRD LD extra lubricator and set injector on legs
08:50 - 09: 15 0.42 CASE P RUNPRD RU to run liner
09:15 - 09:30 0.25 CASE P RUNPRD Safety mtg re: MU liner
09:30 - 10:45 1.25 CASE P RUNPRD MU and drift 30 jts predrilled (3/8" holes/8 pf) and one solid
2-7/8" 6.5# L-80 STL liner
10:45 - 11 :35 0.83 CASE P RUNPRD MU WI! aluminum deployment sub wi GS and set in
mousehole. Install BHI BHA. MU extra lubs
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/612004 11 :35 - 12:50 1.25 CASE N SFAL RUNPRD Test BHI tools before RIH and EDC not working. Break off
lubs, LD MWD tool and pickup backup BHA. Stab back onto
well and test okay
12:50 - 14:10 1.33 CASE P RUNPRD RIH wI liner on CT. Pressure well bore to 550 psi and open
SSSV. RIH following pressure schedule @ 0.4 bpm thru EDC
14:10 - 14:50 0.67 CASE P RUNPRD 8880'31k, 14.8k RIH thru window. See flag at 9041'andcorr
-7'. RIH @ 42'/min and was clean to set down at 10650' which
was solid
14:50 - 15:55 1.08 CASE P RUNPRD Work to get past this point wlo success. Clean pickups, 37k.
PUH 200' and no overpulls, clean when RBIH. Try every trick
in the book and was solid. TOL would be at 9650'. Discuss.
Will do a cleanout run
15:55 - 16:45 0.83 CASE N DPRB RUNPRD POOH wi liner in open hole, 38k, clean. POOH at 1.4 bpm
following pressure schedule
16:45 - 17:15 0.50 CASE N RREP RUNPRD Park wI shoe in 7" to fix hydraulic leak on injector hp filter
17:15 - 18:45 1.50 CASE N DPRB RUNPRD Resume POOH close SSSV trapping 560psi below.
18:45 - 19:45 1.00 CASE N DPRB RUNPRD UD BHA and RU to standback liner
19:45 - 20:50 1.08 CASE N DPRB RUNPRD Stand 15 stds of 2-7/8" liner in derrick. No visible marks on the
end of guide shoe that would indicate running into something
and no marks on other liner componets. RID tools.
20:50 - 21 :50 1.00 CASE N DPRB RUNPRD P/U standard BHi drilling tools.
21 :50 - 00:00 2.17 CASE N DPRB RUNPRD RIH to 1000' pressure up annulus to 600psi and open SSSV
dropped to 540psi. RIH following pressure schedule.
8/7/2004 00:00 - 00:20 0.33 CASE N DPRB RUNPRD Continue RIH
00:20 - 00:30 0.17 CASE N DPRB RUNPRD Log tie-in -15' correction
00:30 - 03:15 2.75 CASE N DPRB RUNPRD Continue RIH tagged at 9976' adjust TF and work area, same
for 10450'-60', continue to TD without problems. TOH to 10350'
and work area back to 10550' clean.
03:15 - 05:30 2.25 CASE N DPRB RUNPRD TOH following pressure schedule. Paint flag at 8000' EOP. Pull
above SSSV and close trapping 550psi below. TOH
05:30 - 06:00 0.50 CASE N DPRB RUNPRD UD BHi tools.
06:00 - 06:20 0.33 CASE N DPRB RUNPRD RU to run liner
06:20 - 06:30 0.17 CASE N DPRB RUNPRD Safety mtg re: MU liner
06:30 - 08:00 1.50 CASE N DPRB RUNPRD MU guide shoe (wi less taper), add 3.5" OD turbo to first it,
then run same assy as prior run which was 30 jts of predrilled
3/8" holes/8 pf and one jt solid 2-7/8" 6.5# L-80 STL. MU BHI
assy on WI! aluminum deployment sub. Add lubs, stab onto
well
08:00 - 09:30 1.50 CASE N DPRB RUNPRD RIH wi liner assy on CT. Pressure above closed sssv to 550
psi and open sssv. RIH following pressure schedule
09:30 - 10:30 1.00 CASE N DPRB RUNPRD 9046' 32k, 14.3k Corr -12' to flag. RIH thru window and by OH
WS, clean. Close EDC and circ at 0.6 bpm while RtH at
70-100'/min. Get deployment sub by the OH WS, then RIH
120'/min until almost set down at 10650', got wt back, then got
to 10660'. PUH 15k over until gettingt normal wt back, then
use hyper speed to get to 10725'. Repeated attempts with
clean pickups gained nothing. Assume turbos are scraping
shales and depositing debris in belly of well bore and 3.5" x 10'
deployment sub just won't pass. Need to be able to circ thru
shoe, but 1.5" ID ot aluminum WS is too small tor inner string
10:30 - 11:45 1.25 CASE N DPRB RUNPRD Discuss while circ thru closed ECD with stacked wt. Work
occasionally with clean pickups 38k
11 :45 - 13:30 1.75 CASE P RUNPRD Circ at 2.0/3260 and release from liner w/30.5k
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/7/2004 11 :45 - 13:30 1.75 CASE P RUNPRD Top of aluminum billet is at 9725', top of predrilled liner is
9771', shoe is at 10725' and has no checks
POOH thru OH, clean. POOH following pressure schedule
13:30 - 14:00 0.50 CASE P RUNPRD LD liner running tools and BHI BHA
14:00 - 14:20 0.33 DRILL P PROD2 Rig evacuation/H2S drill-discuss
14:20 - 14:45 0.42 DRILL P PROD2 MU BHA incl 5' wt bar wlo resistivity
14:45 - 16:30 1.75 DRILL P PROD2 RIH wi BHA #11 (1.5 deg, 2533r bit)
16:30 - 16:55 0.42 DRILL P PROD2 Log tie-in to RA pip, carr -3'
16:55 - 17:25 0.50 DRILL P PROD2 Wiper in hole was clean
17:25 - 21 :20 3.92 DRILL P PROD2 Tag billet of deployment sub at 9732' at min rate. PUH 32k,
start pump. Set TF to highside and start time drilling of
aluminum billet. 2.74/2.723300 fs 3600 DHP time drilled to
9742'. Continued 40-50'/hr rop to 9785' confirming sidetrack
with NB surveys. PU to 9700' RIH dry to 9785' wo problems.
21 :20 - 23:45 2.42 DRILL P PROD2 TOH following pressure schedule.
23:45 - 00:00 0.25 DRILL P PROD2 UD BHi tools.
8/8/2004 00:00 - 01:15 1.25 DRILL P PROD2 P/U BHA #11 wI resitivity tool and HCC bi-center bit.
01:15 - 03:00 1.75 DRILL P PROD2 RIH charge annulus to 550psi and open SSSV. RIH
03:00 - 03:20 0.33 DRILL P PROD2 Log tie-in -13' correction
03:20 - 04:05 0.75 DRILL P PROD2 RIH to 9785'. Seen gas cut mud at surface max 32 units for 15
min ciruclation time.
04:05 - 06:50 2.75 DRILL P PROD2 Drill ahead with #2 lateral f/9785' 2.78/2.703650 DHP
maintaining 140psi on choke. 100-120'/hr. Swap to new mud.
See GR change of first fault at 9885'
06:50 - 07:20 0.50 DRILL P PROD2 Wiper to window. Overpull and MW by deployment billet-will
try to dress it later wi bi bit
07:20 - 07:50 0.50 DRILL P PROD2 Backream billet at 9732' until clean
07:50 - 08:05 0.25 DRILL P PROD2 Fin wiper to TD
08:05 - 10:20 2.25 DRILL P PROD2 Drill ahead 2.7/2.69/3250/90R wI 170 psi bp to hold 3630 psi
DHP, ECD 10.91 PVT 445. Turn TF HS at 9975' (6412' rvD)
to begin build from C2 to C4
10:20 - 11 :40 1.33 DRILL P PROD2 Wiper to window, tie-in to RA pip, corr + l'
11 :40 - 11 :45 0.08 DRILL P PROD2 Drill ahead 2.7/2.69/3300/90L wI 170 psi bp to hold 3640 DHP,
ECD 10.90 PVT 429
11 :45 - 12:00 0.25 DRILL N STUC PROD2 Stuck BHA while drilling at 10088' (differential). Try a couple
pulls at 70k w/o success. Go to neutral, SD pump and trap
WHP 465 psi, DHP 3600. WO Nordic crew change and watch
DHP bleed to 3588 psi. Pull free @ 50k
12:00 - 12:10 0.17 DRILL N STUC PROD2 Wiper to 9950', clean PVT 423
12:10 -14:10 2.00 DRILL P PROD2 Drill ahead 2.76/2.74/3340/95L wI 165 psi bp, DHP 3623, ECD
10.93 continuing invert and showing 104 deg NB incl at 10085'
120'/hr. Get to 10130' and starting to drill wI neg wt
14:10 -15:25 1.25 DRILL P PROD2 Wiper to window, clean. Recip in 7" to flush cuttings. RBIH,
clean PVT 407
15:25 - 16:35 1.17 DRILL P PROD2 Drill ahead 2.77/2.71/3400/90R w/175 psi bp, DHP 3630, ECD
10.95 holding 101 deg and continuing invert in the middle of
C2. Back to drilling w/ positive wt after wiper. Get to 10300'
and tough to make hole. Spudding and not getting much motor
work, somewhat sticky pickups
16:35 - 17:30 0.92 DRILL P PROD2 Wiper to window, clean. Log tie-in to RA pip. Corr +5'
17:30 - 18:00 0.50 DRILL P PROD2 Wiper back to TD, clean
18:00 - 20:05 2.08 DRILL P PROD2 Drilling ahead f/10325' to 10475'. Drilling mostly with negitive
coil wieght, adding Lubetex to mud system to bring
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/812004 18:00 - 20:05 2.08 DRILL P PROD2 concentration up to 4.5% 2.69/2.65 3630 DHp w/200psi at
choke 11.0ppg ECD.
20:05 - 22:10 2.08 DRILL P PROD2 Wiper trip into 7". No problems out or back in.
22: 1 0 - 00:00 1.83 DRILL P PROD2 Drill ahead f/10475' 2.76/2.71 3300 fs 2-500psi mw 3650 DHP
and 190psi back pressure at choke. Drill to 10550' seeing
some siderite stringers.
8/9/2004 00:00 - 01 :00 1.00 DRILL P PROD2 Drill aheaad with lateral #2 fl 10550' to 10607' 2.80/2.76
3660DHP. Lost comms with all BHi topols.
01 :00 - 03:30 2.50 DRILL N DFAL PROD2 TOH. No DHP readout. Follow choke pressure schedule to
TOH. Close SSSV continue pumping to surface then RIH
quickly to clear cuttings.
03:30 - 07:00 3.50 DRILL N DFAL PROD2 Unstab injector. Meg test BHA components and were okay.
Found flat spot on DS CTC. Cut off 40' CT
07:00 - 10:30 3.50 DRILL N DFAL PROD2 Test e-line and determine short is probably at collector. Tear
down collector and check e-line and has continuity, but won't
meg test. WO DS tech. Two different methods found a weak
spot at 9300-9400' from downhole end of eline
Offload used mud from pits in preparation for 60 hr Kuparuk
bridge closure starting at 1800 hrs
10:30 - 12:45 2.25 DRILL N DFAL PROD2 Mobilize equipment to swap E-CT reel out for the standby reel.
WO DS N2
12:45 - 13:00 0.25 DRILL N DFAL PROD2 Safety mtg re: N2 blowdown
13:00 - 15:00 2.00 DRILL N DFAL PROD2 Displace mud in CT wI N2 taking N2 to flowback tank
Fin vac used mud from pits and return to MI. Fill pits wI 290
bbls fresh 9.0 ppg formate mud wi 4% L T
15:00 - 16:30 1.50 DRILL N DFAL PROD2 Safety mtg re: simops
Pull CT back to reel and secure. Lower E-CT onto Veco
lowboy. Load standby reel into reel house
Begin weekly BOPE test at 1530 hrs. Witness waived by
AOGCC
16:30 - 18:30 2.00 DRILL N DFAL PROD2 Hook up hardline in reel house and prep E-CT
Continue BOPE test
18:30 - 22:30 4.00 DRILL N DFAL PROD2 Prep end of coil for stabbing to injector. Stab coil.
22:30 - 00:00 1.50 DRILL N DFAL PROD2 Perform slack management with e-line. Cut 40' coil.
8/10/2004 00:00 - 04:00 4.00 DRILL N DFAL PROD2 Install SLB CTC and BHi upper quick connect. Will not MEG
test. Cut-off CTC completely rehead again. MEG tested okay.
Check well for pressure above SSSV - none.
04:00 - 05:45 1.75 DRILL N DFAL PROD2 Pick-up drilling BHA #12. (Test CTC and UQC to 3500psi
galled UQC sleeve and replaced). Stab on injector
05:45 - 06:20 0.58 DRILL N DFAL PROD2 Pump 1 coil volume at 2.5bpm with EDC open for slack
management.
06:20 - 07:55 1.58 DRILL N DFAL PROD2 RIH wi BHA #12 @ 0.1 bpm taking well bore fluids to pit #1.
Open SSSV to 560 psi. RIH following pressure schedule
07:55 - 08: 15 0.33 DRILL N DFAL PROD2 Log tie-in down to RA pip, corr -15'
08:15 - 09:00 0.75 DRILL N DFAL PROD2 RIH and precautionary ream to TD and was clean! PVT 274
09:00 - 09:45 0.75 DRILL P PROD2 Drill ahead 2.7/2.68/3290/170L-90L to hold 90 deg at 6325'
TVD wI 150 psi bp, 3660 DHP, ECD 11.05 60-100'/hr wI
borderline positive string wt. Mud system is completely
swapped to fresh mud wi 4% L T
09:45 - 11 :50 2.08 DRILL P PROD2 Have trouble making hole past 10650', stacking, sharp
near-stalls. See deep ohms start to shoot off scale at 10630',
followed by medium, but both retumed to prior readings at
10665'? Penetration rate picked back up at 10680'. Drill in
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
7/28/2004
8/13/2004
2
Spud Date: 5/16/1981
End: 8/13/2004
8/10/2004 09:45 - 11 :50 2.08 DRILL P PROD2 spurts w/ neg wt to 10734'
11 :50 - 12:30 0.67 DRILL P PROD2 Wiper to window, clean
12:30 - 12:45 0.25 DRILL P PROD2 Log tie-in down to RA pip, no corr
12:45 - 13:40 0.92 DRILL P PROD2 Wiper to TD, clean
13:40 - 15:50 2.17 DRILL P PROD2 Dril ahead 2.67/2.65/3230/85L w/ 150 psi bp, 3640 DHP, ECD
11.0 good ROP > 10790' to 10830' then falling back to 15'/hr
then very hard.
15:50 - 17:00 1.17 DRILL P PROD2 Wiper trip up to window - good (new target 6365'tvd at revised
TD of 11200')
17:00 - 18:00 1.00 DRILL P PROD2 Wiper back to bottom..no problems.
18:00 - 20:14 2.23 DRILL P PROD2 Drill ahead hard. 9.0/9.02.80/2.77 3670psi annular 11.14 ECD
holding 135psi at surface.
20:14 - 21:05 0.85 DRILL P PROD2 Drilling at 90R TF with negative WOB
MW=8.97/9.02
Qp = 2.81/2.72 bpm
Pa = 3674/4239 psi
ECD = 11.18ppg
Vp = 227 bbl
IAlOA = 700/63 psi
Vol KWF = 380 bbl , 11 ppg
21 :05 - 22:45 1.67 DRILL P PROD2 Wiper trip to TT to 8600' RIH to tie-in
22:45 - 22:54 0.15 DRILL P PROD2 Tie-in at RA Marker at 8938'/8960' Logging down (+1
correction)
22:54 - 00:00 1.10 DRILL P PROD2 RIH and corrected TF as per needed
8/11/2004 00:00 - 01 :45 1.75 DRILL P PROD2 Drilling at HS 57L TF to build angle up to 85 deg to TD w/ -8k
to -15k WOB ROP 10 to 80 fph
MW=8.99/9.03
Qp = 2.82/2.83 bpm
Pc = 150 to 160 psi
Pa = 36614 psi/4453 psi
ECD = 11.19 ppg
Vp = 216 bbl
IAlOA = 720/65 psi
Vol KWF = 380 bbl , 11 ppg
01 :45 - 02:30 0.75 DRILL P PROD2 Drilling at 100R w/ -8k to -15k WOB ROP 10 to 100 fph
MW=9.019.03
Qp = 2.82/2.83 bpm
Pc = 150 psi
Pa = 3664/4453 psi
ECD = 11.31 ppg
Vp = 204 bbl. Lost 26 bbl in 8 hrs
IAlOA = 757/66 psi
Vol. KWF = 380 bbl , 11 ppg
02:30 - 05:26 2.93 DRILL P PROD2 Wiper trip, ECD climbing due to higher ROP's Redued running
speed on wiper trip to reduced surge pressure (22 fph). Tagged
3 times at 10832 ft and once at 10900 ft. Orient TF around due
to stops. Started replacement mud down. CT Lost 38 bbt
during last 12 hrs
05:26 - 07:50 2.40 DRILL P PROD2 Drilling at 90 R. Actual WOB 1-2k coil string wt -12k to +2k.
2.8/2.793650 annular 11.2ECD
07:50 - 10:15 2.42 DRILL P PROD2 Wiper trip to window. Setdowns at 10709' & 10830', motorwork
from 10830'-10930'. Worked these areas several times.
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
7/28/2004
8/13/2004
2
Spud Date: 5/16/1981
End: 8/13/2004
8/11/2004 10:15 - 11 :30 1.25 DRILL P PROD2 Drill ahead f/11193'. 1.3K wob 2.78/2.71 3550fs 2-300mw
3700 annular 11.2ecd Coil WI anywhere from -12k to +2k.
11 :30 - 14:45 3.25 DRILL P PROD2 Wiper trip to window. Flush 7". Tie-in +2' correction. Wiper to
bottom tagged at 1 0700' and 1 0835' work areas several times
with varying TF's
14:45 - 16:00 1.25 DRILL P PROD2 Drill ahead f/ 11284' 2.77/2.73 3-400psi MW 3690 annular
11.18ECD 2k wob. Drilled to 11350'TD
16:00 - 19:10 3.17 DRILL P PROD2 Wiper trip back to window 35k up WI Took a little WI at 10832 ft,
went through, RIH
19:10-21:05 1.92 DRILL P PROD2 PUH to tie-in, working pipe shed and mixing liner pill
21:05 - 21:15 0.17 DRILL P PROD2 Tied-in to RA Marker at 8938 ft. (No Correction)
21:15 - 23:07 1.87 DRILL P PROD2 RIH to confirm TD Tagged at 10836 with 60 RTF, PU and
orient TF to 75 R. Worked through area again. RIH, clean at
45R. Tagged at PTD @ 11351ft.
23:07 . 00:00 0.88 DRILL P PROD2 PUH to 10700 ft to work problem area while mixing liner pill.
RIH tagged at 10836 ft with 70R TF, PUH and oriented TF to
45R, went through. RIH to 10900 ft
8/12/2004 00:00 - 00:15 0.25 DRILL P PROD2 PUH to 10750 ft and RIH, worked through 10836 ft area at 45R
TF.
00: 15 - 00:35 0.33 DRILL P PROD2 RIH to 11351ft
00:35 - 00:50 0.25 DRILL P PROD2 Cir liner pill down CT
00:50 - 02:02 1.20 DRILL P PROD2 PUH laying in liner pill maintaining 3650 psi BHP
02:02 - 02:09 0.12 DRILL P PROD2 At 8830 ft, switch to 11.00 ppg KWF down CT Pull up into
4-1/2" and RIH, Open EDC
02:09 - 03:07 0.97 DRILL P PROD2 Circulate 11 ppg KWF adjusting choke to maintain pressure
schedule at 8800 ft MD
Q = 3.4 to 2.17 bpm. maintaing 3655 psi BHP
With 85 bbl in annulus, lossing 0.18 to 0.20 bpm at 2 bpm.
BHP = 3688 posi at 6241 ft TVD
With 92 bbl pumped in annulus, lossing 0.09 bpm at 1.39 bpm
BHP = 3660 psi at 6241' TVD
Density = 1 0.8/1 0.7ppg taking fluid back to pits
03:07 - 04:00 0.88 DRILL P PROD2 With 101 bbl pumped in annulus reduced Q to 1 bpm waiting on
vac truck to transfer more brine before POOH
BHP = 3650 psi wI 11.35 ppg ECD
Cir at 1.00/0.85 bpm, lossing 0.15 bpm; BHP = 3690 psi (11.47
ppg ECD)
Density = 10.9/10.9 ppg MM
04:00 - 04:15 0.25 DRILL P PROD2 SD, checked flow, WHP = 0 psi, monitored, well dead.
04:15·05:45 1.50 DRILL P PROD2 POOH, filling hole, and running trip sheet Painted flag at 4000
ft EOP.
While painting flag, lossing 0.08 bpm
05:45 - 06:00 0.25 DRILL P PROD2 OOH, Monitor well. Well dead. cir across the top, SD and make
ready to unstab
Well on slight vac
06:00 - 06:30 0.50 DRILL P PROD2 MU safety jt and UD BHA
06:30 - 06:45 0.25 RUNCONP RUNCMP PJSM review liner porocedures and hazards.
06:45 - 10:30 3.75 RUNCONP RUNCMP Make-up and RIH w/2-2/8"and 3·3/16" liner.
10:30 -11:15 0.75 RUNCONP RUNCMP Load shed with 1-1/4" CSH. R/U false table, change out
elevators.
11:15-14:45 3.50 RUNCOMP RUNCMP Run 81 jts CSH innner string.
14:45 - 15:15 0.50 RUNCQrvP RUNCMP MU CSH spaceout jts and CTLRT
15:15 - 16:30 1.25 RUNCONP RUNCMP PU 20 3-1/8" drill collars
Printed: 8/16/2004 8:58:22 AM
e
e
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1 C-08
1 C-08
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 7/28/2004
Rig Release: 8/13/2004
Rig Number: 2
Spud Date: 5/16/1981
End: 8/13/2004
8/12/2004 16:30 - 18:23 1.88 RUNCOMP RUNCMP PU BHi tools. Test tools. EDC failed. Change out BHi tools
Test tool at surface
18:23 - 19:58 1.58 RUNCm.p RUNCMP RIH, Wt BHA = 30k at surface. (Corrected to EOP 4000' Flag
-18.2 ft)
19:58 - 20:251 0.45 RUNCOIvP RUNCMP Wt check at 8800 ft = 20k down, and 4.5K up
RIH
20:25 - 22: 1 0 1.75 RUNCOIvP RUNCMP Tagged at 11125 ft. PUH aPUW = 62k, Worked liner from
11,125 ft 11,186 ft without cir. Closed EDC and circulated
down 1-1/4" CSH at 0.5 to 1 bpm.
Worked CT and pushed liner to 11, 270 ft. Free travel to this
point. Stuck at 11270ft.
Estimated btm of liner at 11270' and top of liner at 8714 ft
1S"UNct Put deployment slleve in compression, released from liner
22: 10 - 23:43 RUNCMP POOH with CT/DC and CSH. Filling hole across the top
Stopped at 6491 and checked for flow. POOH. JSA on BHA
handling while POOH
23:43 - 00:00 0.28 RUNCO RUNCMP OOH, monitor well, OK, unstab
8/13/2004 00:00 - 03:45 3.75 RUNCOIvP RUNCMP LD liner running BHA
03:45 - 04:30 0.75 WHSUR P POST RD handling tools, PU injector and RU nozzle BHA to FP
well bore
04:30 - 06:00 1.50 WHSUR P POST RIH to 8615'.
06:00 - 08:30 2.50 WHSUR P POST Displace well bore to diesel. Trapped 1000 psi under SSSV.
Displace to surface. Close MV and SV 23 turns..
08:30 - 08:45 0.25 WHSUR P POST PJSM review plans procedures to blowdown reel with N2
08:45 - 10:00 1.25 WHSUR P POST Blowdown reel with N2 to Tiger Tank
10:00 - 11:00 1.00 WHSUR P POST UD nozzle BHA. Remove BHi upeer quick connect. Cut-off
SLB CTC. Seal e-line. Cleaning mud tanks.
Transfering recovered KW brine to 1 Y pad. Transferring used
Flo-Pro mud to MI Deadhorse.
11 :00 - 12:00 1.00 WHSUR P POST Install internal coil grapple. Unstab 2-3/8" coil from injector and
secure to reel.
12:00 - 13:00 1.00 WHSUR P POST Lower 2-3/8" reel to Veco flatbed truck
13:00 - 18:00 5.00 WHSUR P POST ND BOPE. Install tree cap and test to 5k. 1st PT on cap failed
Make rig ready to move to 1Y-24
Rig Released at 18:00 hrs 8/13/2004
Printed: 8/16/2004 8:58:22 AM
.,
.
BP-GDB
Baker Hughes INTEQ Survey Report
.
.¡¡.
BAKU
HUGHlS
lNTEQ
~
Company:
Field:
Site:
Well:
Wellpath:
ConocoPhillips Alaska, Inc.
Kuparuk River Unit
KRU 1C Pad
1 C-08
1 C-08l 1
Date: 8/31/2004 Time: 15:37:24 Page:
Co-ordinate(NE) Reference: Well: 1 C-08. True North
Vertical (fVD) Reference: Wellhead(94') 94.0
Section (VS) Reference: Well (0.00N,0.00E,318.00Azi)
Survey Calculation Method: Minimum Curvature Db: Sybase
Field: Kuparuk River Unit
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
l Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: KRU 1 C Pad
UNITED STATES: North Slope
Site Position: Northing: 5968605.00 ft Latitude: 70 19 29.107 N
From: Map Easting: 562247.20 ft Longitude: 149 29 42.918 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.48 deg
Well: 1 C-08 Slot Name:
1 C-08
Well Position: +N/-S 392.76 ft Northing: 5968992.90 ft Latitude: 70 19 32.970 N
+E/-W -580.02 ft Easting : 561664.00 ft Longitude: 149 29 59.848 W
Position Uncertainty: 0.00 ft
Wellpath: 1C-08L 1
500292058560
Current Datum: Wellhead(94'}
Magnetic Data: 8/3/2004
Field Strength: 57575 nT
Vertical Section: Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
1C-08L 1PB1
9528.00 ft
Mean Sea level
24.72 deg
80.77 deg
Direction
deg
318.00
Height 94.00 ft
Survey Program for Definitive Well path
Date: 8/6/2004 Validated: Yes
Actual From To Survey
ft ft
100.00 8900.00
8930.00 9500.81
9528.00 10954.00
Version: 4
Toolcode
Tool Name
GMS (100.00-9776.00) (O)
MWD (8930.00-10175.00) (3)
MWD (9528.00-10954.00)
Good_gyro
MWD
MWD
Good Gyro
MWD - Standard
MWD - Standard
Annotation
MD
ft
8930.00
9500.81
9528.00
10954.00
TVD
ft
6435.36
6500.82
6501.24
6555.91
Window
TIP
KOP
TO
Survey: MWD
CoilTrak
Company: Baker Hughes INTEQ
Tool: MWD;MWD - Standard
Start Date:
8/6/2004
Engineer:
Tied-to:
From: Definitive Path
;l. c t.{ .., III
. BP-GDB . IS..
BAKU
HUGHES
Baker Hughes INTEQ Survey Report INTEQ
Company: ConocoPhillips Alaska, Inc. Date: 8/31/2004 Time: 15:37:24 Page: 2
Field: Kuparuk River Unit Co-ordinate(NE) Reference: Well: 1 C-08, True North
Site: KRU 1C Pad Vertical (TVD) Reference: Wellhead(94'} 94.0
Well: 1 C-08 Section (VS) Reference: Well (0.00N,0.00E,318.00Azi)
Wellpath: 1 C-08L1 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/10ot!
8930.00 40.00 312.55 6435.36 6341.36 2364.19 -4738.86 5971317.84 556906.33 4927.85 0.00
9500.81 89.52 327.50 6500.82 6406.82 2818.24 -5033.46 5971769.41 556608.03 5462.40 8.96
9528.00 88.74 331 .26 6501.24 6407.24 2841.63 -5047.31 5971792.69 556594.00 5489.05 14.12
9544.90 90.08 326.47 6501.41 6407.41 2856.09 -5056.04 5971807.07 556585.14 5505.64 29.43
9583.13 88.85 318.72 6501.77 6407.77 2886.43 -5079.25 5971837.22 556561.69 5543.72 20.52
9616.20 87.99 313.09 6502.68 6408.68 2910.16 -5102.24 5971860.76 556538.51 5576.74 17.22
9656.42 86.64 304.28 6504.57 6410.57 2935.25 -5133.57 5971885.59 556506.98 5616.34 22.14
9685.80 90.38 299.33 6505.33 6411.33 2950.72 -5158.52 5971900.85 556481.91 5644.53 21.11
9716.72 87.22 293.37 6505.98 6411.98 2964.44 -5186.20 5971914.34 556454.11 5673.25 21.81
9747.65 90.02 299.19 6506.73 6412.73 2978.12 -5213.91 5971927.79 556426.29 5701.96 20.87
9777.47 91.70 304.83 6506.28 6412.28 2993.92 -5239.18 5971943.38 556400.89 5730.61 19.73
9811.97 91.06 310.68 6505.45 6411.45 3015.03 -5266.44 5971964.26 556373.47 5764.54 17.05
9843.19 87.28 313.14 6505.90 6411.90 3035.87 -5289.66 5971984.91 556350.07 5795.57 14.44
9874.33 89.28 306.81 6506.84 6412.84 3055.86 -5313.50 5972004.70 556326.07 5826.37 21.31
9905.29 89.19 300.61 6507.25 6413.25 3073.03 -5339.24 5972021.66 556300.20 5856.36 20.03
9938.70 90.26 295.22 6507.41 6413.41 3088.67 -5368.75 5972037.05 556270.56 5887.72 16.45
9971.24 91.30 289.58 6506.97 6412.97 3101.06 -5398.82 5972049.19 556240.39 5917.05 17.62
10006.52 94.18 288.09 6505.28 6411.28 3112.44 -5432.17 5972060.30 556206.96 5947.82 9.19
10036.56 93.82 279.30 6503.18 6409.18 3119.52 -5461.26 5972067.14 556177.81 5972.55 29.21
10067.69 93.33 282.24 6501.24 6407.24 3125.33 -5491.78 5972072.70 556147.25 5997.29 9.56
10099.88 93.08 287.59 6499.44 6405.44 3133.60 -5522.82 5972080.71 556116.14 6024.21 16.61
10129.08 91.61 292.73 6498.24 6404.24 3143.65 -5550.20 5972090.54 556088.69 6050.00 18.29
10167.23 88.64 297.93 6498.16 6404.16 3159.96 -5584.67 5972106.56 556054.09 6085.18 15.70
10196.62 87.47 303.03 6499.16 6405.16 3174.86 -5609.97 5972121.25 556028.67 6113.18 17.79
10228.45 85.28 307.46 6501.17 6407.17 3193.18 -5635.91 5972139.36 556002.58 6144.16 15.50
10261.15 83.52 311.79 6504.36 6410.36 3213.93 -5660.97 5972159.90 555977.35 6176.34 14.23
10294.84 82.84 316.87 6508.37 6414.37 3237.30 -5684.89 5972183.06 555953.24 6209.71 15.11
10323.72 80.45 320.67 6512.56 6418.56 3258.78 -5703.72 5972204.39 555934.24 6238.28 15.43
10354.59 81.38 325.87 6517.44 6423.44 3283.20 -5721.94 5972228.66 555915.82 6268.62 16.90
10387.44 80.38 331.73 6522.65 6428.65 3310.93 -5738.74 5972256.25 555898.80 6300.47 17.87
10428.62 81.95 329.92 6528.98 6434.98 3346.46 -5758.57 5972291.60 555878.67 6340.14 5.78
10460.07 83.05 340.03 6533.09 6439.09 3374.67 -5771.74 5972319.71 555865.27 6369.92 32.06
10491.54 84.82 346.09 6536.42 6442.42 3404.59 -5780.85 5972349.55 555855.92 6398.25 19.96
10521.70 89.03 352.77 6538.04 6444.04 3434.18 -5786.37 5972379.09 555850.16 6423.93 26.15
10561.25 86.61 357.99 6539.55 6445.55 3473.55 -5789.55 5972418.43 555846.65 6455.32 14.54
10592.62 88.81 353.59 6540.80 6446.80 3504.80 -5791.85 5972449.66 555844.10 6480.08 15.67
10637.18 87.13 346.17 6542.38 6448.38 3548.61 -5799.67 5972493.40 555835.92 6517.87 17.06
10669.62 87.44 343.46 6543.92 6449.92 3579.88 -5808.16 5972524.59 555827.18 6546.79 8.40
10697.73 87.57 339.43 6545.14 6451.14 3606.50 -5817.09 5972551.13 555818.02 6572.55 14.33
10736.54 87.99 334.56 6546.65 6452.65 3642.18 -5832.25 5972586.69 555802.58 6609.20 12.59
10769.61 87.08 330.40 6548.07 6454.07 3671.48 -5847.51 5972615.85 555787.08 6641.19 12.87
10802.12 87.82 332.69 6549.52 6455.52 3700.03 -5862.98 5972644.27 555771.37 6672.76 7.40
10836.51 86.35 336.73 6551.26 6457.26 3731.08 -5877.65 5972675.20 555756.45 6705.65 12.49
10875.55 87.98 340.72 6553.20 6459.20 3767.40 -5891.79 5972711.40 555742.01 6742.11 11.03
10905.24 88.03 '346.35 6554.23 6460.23 3795.85 -5900.20 5972739.77 555733.37 6768.87 18.95
10954.00 88.03 346.35 6555.91 6461.91 3843.20 -5911.70 5972787.03 555721.48 6811.76 0.00
.
.
II..
BAKU
HUGtIIS
INn:'Q
BP-GDB
Baker Hughes INTEQ Survey Report
Company:
Field:
Site:
Well:
Wellpath:
ConocoPhillips Alaska, Inc.
Kuparuk River Unit
KRU 1C Pad
1 C-08
1C-08L1 PB1
Field: Kuparuk River Unit
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Site: KRU 1 C Pad
Date: 8/31/2004 Time: 15:33:02 Page:
Co-ordinate(NE) Reference: Well: 1C-08. True North
Vertical (TVD) Reference: Wellhead(94') 94.0
Section (VS) Reference: Well (0.OON,0.00E,300.38Azi)
Survey Calculation Method: Minimum Curvature Db: Sybase
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
UNITED STATES: North Slope
Site Position: Northing: 5968605.00 ft
From: Map Easting: 562247.20 ft
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Height 94.00 ft
Well: 1C-08
1 C-08
Well Position: +N/-S
+E/-W
Position Uncertainty:
392.76 ft
-580.02 ft
0.00 ft
Northing:
Easting :
Wellpath: 1C-08L 1PB1
500292058570
Current Datum: Wellhead(94'}
Magnetic Data: 7/30/2004
Field Strength: 57574 nT
Vertical Section: Depth From (TVD)
ft
0.00
Survey Program for Definitive Wellpath
Date: 8/3/2004 Validated: Yes
Actual From To Survey
ft ft
100.00 8900.00
8930.00 10175.00
GMS (100.00-9776.00) (O)
MWD (8930.00-10175.00)
Annotation
MD
ft
8900.00
8930.00
10175.00
TVD
ft
6412.38
6435.36
6542.59
TIP
KOP
TO
Survey: MWD
CoilTrak
Company: Baker Hughes INTEQ
Tool: MWD;MWD - Standard
Survey
MD Incl Azim TVD SSTVD
ft deg deg ft ft
8900.00 40.00 312.40 6412.38 6318.38
8930.00 40.00 312.55 6435.36 6341.36
8960.39 45.24 313.60 6457.72 6363.72
8990.32 55.82 314.70 6476.72 6382.72
9020.94 66.05 315.80 6491.57 6397.57
9051.24 76.54 316.99 6501.28 6407.28
9085.57 88.67 316.11 6505.69 6411.69
9124.83 91.46 321.31 6505.64 6411.64
9157.32 92.32 327.80 6504.57 6410.57
9191.01 93.67 333.97 6502.81 6408.81
9222.10 92.62 339.19 6501.10 6407.10
5968992.90 ft
561664.00 ft
Latitude: 70 19 29.107 N
Longitude: 149 29 42.918 W
North Reference: True
Grid Convergence: 0.48 deg
Slot Name:
Latitude: 70 19 32.970 N
Longitude: 149 29 59.848 W
+N/-S
ft
0.00
Drilled From:
Tíe-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
1 C-08
8930.00 ft
Mean Sea Level
24.73 deg
80.77 deg
Direction
deg
300.38
Version: 2
Toolcode
Tool Name
Good_gyro
MWD
Good Gyro
MWD - Standard
Start Date: 8/2/2004
Engineer:
Tied-to: From: Definitive Path
N/S E/W MapN MapE VS DLS
ft ft ft ft ft deg/100ft
2351.17 -4724.64 5971304.94 556920.65 5264.98 0.00
2364.19 -4738.86 5971317.84 556906.33 5283.84 0.32
2378.25 -4753.88 5971331.77 556891.19 5303.91 17.40
2394.33 -4770.42 5971347.72 556874.52 5326.31 35.46
2413.32 -4789.23 5971366.55 556855.56 5352.14 33.56
2434.08 -4808.99 5971387.15 556835.63 5379.68 34.82
2458.74 -4832.36 5971411.62 556812.06 5412.32 35.42
2488.23 -4858.26 5971440.89 556785.93 5449.57 15.03
2514.67 -4877.08 5971467.17 556766.89 5479.18 20.14
2544.05 -4893.44 5971496.41 556750.29 5508.15 18.72
2572.52 -4905.77 5971524.78 556737.72 5533.19 17.10
~~ '" - 1/ {
. BP-GDB . ...
. . 8AKD
NUGHlS
Baker Hughes INTEQ Survey Report INTEQ
Company: ConocoPhillips Alaska, Inc. Date: 8/31/2004 Time: 15:33:02 Page: 2
Field: Kuparuk River Unit Co-ordinate(NE) Reference: Well: 1C-08, True North
Site: KRU 1C Pad Vertical (TVD) Reference: Wellhead(94'} 94.0
Well: 1 C-08 Section (VS) Reference: Well (0.00N,O.00E.300.38Azi)
Wellpath: 1C-08L 1PB1 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
9252.44 90.38 344.38 6500.31 6406.31 2601.32 -4915.25 5971553.49 556728.01 5555.93 18.62
9285.57 89.98 340.35 6500.20 6406.20 2632.89 -4925.28 5971584.97 556717.72 5580.55 12.22
9321.81 90.63 335.05 6500.01 6406.01 2666.40 -4939.03 5971618.37 556703.70 5609.35 14.73
9355.82 90.35 329.91 6499.72 6405.72 2696.55 -4954.74 5971648.39 556687.74 5638.15 15.14
9384.04 88.02 326.38 6500.12 6406.12 2720.52 -4969.63 5971672.23 556672.66 5663.11 14.99
9427.90 88.85 325.12 6501.32 6407.32 2756.76 -4994.30 5971708.26 556647.69 5702.73 3.44
9459.70 91.55 328.55 6501.21 6407.21 2783.37 -5011.69 5971734.73 556630.08 5731.19 13.73
9500.81 89.52 327.50 6500.82 6406.82 2818.24 -5033.46 5971769.41 556608.03 5767.60 5.56
9552.02 88.05 334.58 6501.91 6407.91 2863.00 -5058.24 5971813.97 556582.89 5811.61 14.12
9578.67 88.67 334.38 6502.67 6408.67 2887.04 -5069.71 5971837.91 556571.22 5833.67 2.44
9611.40 88.30 336.45 6503.54 6409.54 2916.79 -5083.32 5971867.55 556557.37 5860.46 6.42
9636.78 88.08 331.79 6504.34 6410.34 2939.61 -5094.39 5971890.27 556546.11 5881.54 18.37
9679.70 86.18 328.33 6506.49 6412.49 2976.75 -5115.78 5971927.23 556524.42 5918.78 9.19
9713.92 85.59 323.87 6508.95 6414.95 3005.07 -5134.81 5971955.39 556505.16 5949.52 13.11
9744.33 86.42 319.76 6511.07 6417.07 3028.91 -5153.56 5971979.07 556486.21 5977.75 13.76
9775.00 87.50 315.79 6512.69 6418.69 3051.59 -5174.14 5972001.57 556465.45 6006.97 13.40
9806.41 88.29 311.91 6513.85 6419.85 3073.33 -5196.78 5972023.13 556442.64 6037.49 12.60
9846.03 87.62 307.75 6515.26 6421.26 3098.68 -5227.18 5972048.23 556412.04 6076.54 10.63
9877.90 86.33 303.46 6516.95 6422.95 3117.21 -5253.04 5972066.54 556386.02 6108.22 14.04
9905.47 86.20 298.58 6518.74 6424.74 3131.38 -5276.61 5972080.52 556362.34 6135.72 17.67
9925.91 86.54 295.34 6520.04 6426.04 3140.63 -5294.79 5972089.61 556344.09 6156.08 15.91
9954.81 87.15 289.98 6521.63 6427.63 3151.74 -5321.41 5972100.51 556317.38 6184.67 18.64
9986.24 86.76 286.33 6523.30 6429.30 3161.52 -5351.23 5972110.04 556287.48 6215.34 11.66
10017.54 83.93 283.71 6525.84 6431.84 3169.60 -5381.36 5972117.87 556257.30 6245.41 12.30
10048.27 83.32 288.38 6529.25 6435.25 3178.04 -5410.70 5972126.07 556227.89 6274.99 15.23
10079.75 83.47 292.36 6532.88 6438.88 3188.92 -5440.01 5972136.71 556198.49 6305.78 12.57
10111.61 85.16 297.66 6536.03 6442.03 3202.32 -5468.72 5972149.87 556169.67 6337.34 17.38
10175.00 83.00 308.00 6542.59 6448.59 3236.45 -5521.64 5972183.56 556116.48 6400.24 16.58
"FIOOUC'IION
HUb-~~-¿~~4 11:11 PHILLIPS AK INC
~V,~ DATE I BY I CK' I APP I .APESCRIPTlON
_ !f!i~/03J MRT BGM' Rev. Wlrr K03105ACS
. ..
Well
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
21
22
23
24
25
26
27
101
102
104
106
109
111
113
115
117
119
121
123
125
127
129
,
ëADD F1LE NO.
U<6103D31
'Y'
5,966,523
5.968,590
5,96~,656
5.968,727
5,968,793
5,968,860
5,968.926
5..968,993
.. 5,968,8~1.99
5.968,763.33
5.969,.008.74
5,969.000.20
5.968,842.1.3
5.968,672.21
5,96S,605.15
5.968.825.37
5,96ß,83B.00
5,~6B. 758.80
5,968,624.28
5,968.637.75
5,96B,646.48
5,968,579.61
5,968,571.44
5.968,546.47
;;.968.538.05
5.968.529.79
5.968,821.46
5.968.81.3.50
5,968.796.65
5,968,779.74-
5,968.746.59
5, 96B~7 30.13
5.968,713.56
5,968,696.96
5.968,680.39
5,968,664.02
5,968,646.80
5,968.630.35
5,968,~13. 75
5,968,597.14
5,968,580.60
A.S.P,s
'x'
907 265 6224 P.02
I;VI5;~ìo31:~TI.1 APP I Rev, P;;~~~;~80ACS
Sec,
1
12, T, 11 N.,
LATITUDE
562,372
562,271
562,172
562.065
561,965
561,864
561.765
561,664
561,548.05
561,680.92
561,641.06
561,653.40
561.891.29
562,146.39
562.247.15
561.916.31
561,568.78
562,O1~.22 .
562,368.. 18
562.> 198.12
562.334.93
562,285.45
562,297.94
562,335,47
562.347.~o3
562,360.58
561.593.72
561.606.18
561,631.04
561.656.61
561,706.13
561,731.01
561,755.87
561. 780. a6
561,805.95
561,830.61
561.856.20
561,8aO.54
561,905.78
561,930.71
5'61,955.57
70' 19' 28.29"
70' 19'. 28.96"
70' 1 9' 29.61"
70' 19' 30.32"
70' 19' 30.98"
70' 19' 31.65"
70' 19' 32.30·
70' 19' .3~.97"
70' 19' 31.5934"
70' 19' 30,7J07"
70' 1 9' 33.128"
70' 19' 33.043"
70' 19' 31.469"
70' 19' 29.777"
70' 19' 29.109"
70' 19' 31,302"
70' 1~' 31.454"
70' 19' 30.639"
70' 19' 29.287"
70' 1~' 29.434"
70'.19' 29.50a"
70' 19' 28.855"
70' 19' 28.773"-
70' 19' 28.525"
70' 19' 28.441"
79' 19' 28.358"
70' 19' 31.289
70' 19' 31.210"
70' 19' 31.042"
70' 19' 30.874"
70' 19' 30.544"
70' 19' 30.380"
70' 19' 30.215"
70' 1 9' 30.050"
70' 19' 29.885"
70' 19' 29.722"
70' 19' 29.550"
70' 19' 29.387"
70' 19' 29.i21"
70' 19' 29.056"
70' 19' 28.891"
R. 1 0 E.
LONGITUDE
149' 29' 39.030"
149' 29' 42.21"
149' 29' 45.10"
149' 29' 48.18"
149' 29' Sl.0a"
149' 29' 54.04"
149' 29' 56.92"
149' 29' 59.85"
149' 30' 03.266"
149' 2.9' 59.410"
149' 30' 00.514"
149' 30' 00.156"
149' 29' 53.249"
149' 29' 45.844"
149' 29' 42.919"
149' 29' 52.523"
149' 30' 92.665"
149' 29' 49.623"
149' 29' 39..382"
149' 29' .44.342"
149' 29' 40.347"
149' 29' 41.807"
149' 29' 41.445"
149' 29' 40.355"
149' 29' 39.994"
149' .29' 39,626"
149' 30' 01.941"
149' 30' 01.579"
149' 30; oo:ssr
149' 30' 00.115"
149' 29' 58,678i'
149' 29' 57.955';'
149' 29' 57.233"
149' 29' 56.50a"
149' 29' 55.760"
149' 29' 55.064"
149' 29' 54.321·
149' 29' 53.614"
149' 29' 52.882"
149" 29' 52.158"
149' 29' 51.436"
D~1: [~1: PAD I O.G.
0/5 O/S .ElEV. ELEV.
F,N,L. F". W,L.
1. 717'
1,649'
1.582'
1.510'
1,442'
1.375'
1.308'
1,240'
1.3Ejl'
1.471'
1.225'
1.234'
1.394'
1.566'
1.634'
1.411'
1.395'
1.478'
1,616;'
1,60~'
1,593'
1.660'
1,668;
1.69.3'
1,702'
1,710'
,,412'
1.420'
1,437'
1.454'
1,487'
1,504'
1,521'
1,538'
1,555'
1,571'
1,589'
1.605'
1.622'
1.639'
1,656'
1,36.3' N/A N/A
1.263' N/A N/A
1,164' N/A N/A
1,058' N/A N/A
958' N/A N/A
859' N/A N/A
760' N/A N/A
660' N/A N/A
542' N/A N(A
674' N/A N/A
637' 60.4' 55.0'
64:9' 60.4' 55.1'
885' 6004' 55.0'
1.139' 60.4' 55.0'
1239' 60.3' 55.0'
910' 60.3' 5~,0'
563' 60.5' 5.9.2'
l,Q10' 60.4' 55.0'
1,360' 59.1' 52.3'
1,191.' 60.3' 55.0'
1,327' 59.1' 51.6'
1,277' 60.3' 55.2'
1,290' 60.3' 55.2'
1.327' 60.2' 55.0'
1.339' 60.~' 55.0'
1,352' 60.2' 55.0'
586' 60.6' 56.7'
600' 60.6' 56.]'
625' 60.6' 56.7'
650' 60.7' 56.7'
699' 60." 56.6'
724' 60.7' 56.5'
749' 60.7' 56.5'
774' 60.7' 56.4'
799' 60.8' 56.3'
823' 60.8' 56.2'
849' 60,8' 56.1'
873' 60.8' 55.9'
898' 60.8' 55.8'
923' 60.8' 55. T
947' 60.8" 55.6'
.~
ConocoPhillips
Alaskat Inc,
I / I DRAWING NO:
63001
\
AREA: 1C MODULE: XXXX UNIT: D1
DS1C
WEll CONDUCTORS
ASBUIL T LOCATIONS
GEA-D1 eX-61 03D31 I PART: 2 OF 3 I REV: a
TOTAL P. 02
-- STATE OF ALASKA e
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: llLD...rf,}iJiJ.@ªº,ml.ü.'.~AªtQ:.ftt.H.§
a0t1Gc _prudhoe _ bay@admin.statø.ak.us
bo b ~f!eGke nstei n@adm¡o.slate.fjk.us
Rig No.: 2 DATE: 8/3/04
Rig Phone: 670-3249 Rig Fax: 670-3245
Op. Phone: 670-3247 Op. Fax: 670-3245
E-Mailsu.adwdrlgnordic2supervisor@bp.co
PTD # 204-111 Meridian: UM
Township: 11N Range: 10E
Workover: Explor.:
Weekly: X Other:
Annular: 250/3500 Valves: 250/4500
TEST DATA FLOOR SAFETY VALVES:
P/F Quantity P/F
P Upper Kelly
P Lower Kelly
P Ball Type
Inside BOP
Contractor: NORDIC/SLB
Rig Rep.: Mckeirnan Ilgtanlok
Operator: BPX
Rep.: Sevcik 1 Goodrich
Well Name: KUP 1 C-08L 1
Location: Section: 12
Operation: Drlg: X
Test: Initial:
Test Pressure: Rams: 250/4500
MISC. INSPECTIONS:
P/F
P
P
P
P
Location Gen.:
Housekeeping:
PTD On Location
Standing Order Posted
Well Sign
Dr!. Rig
Hazard Sec.
2
P
BOP STACK: Quantity Size/Type P/F MUD SYSTEM: Visual Alarm
Stripper 1 23/8 " P Trip Tank P P
Annular Preventer 1 71/16 P Pit Level Indicators P P
#1 Rams 1 Blinds P Flow Indicator P P
#2 Rams 1 3" Slips P Meth Gas Detector P P
#3 Rams 1 2 3/8"x 3 1/2" P H2S Gas Detector P P
#4 Rams 1 2 3/8" Combi P
#5 Rams N/A P Quantity P/F
Choke Ln. Valves 1 3-1/8/5000 P Inside Reel valves 1 P
HCR Valves 2 3-1/8/5000 P
Kill Line Valves 1 3-1/8/5000 P ACCUMULATOR SYSTEM:
Check Valve N/A Time/Pressure P/F
System Pressure 3000 P
CHOKE MANIFOLD: Pressure After Closure 2200 P
Quantity P/F 200 psi Attained 20 sec P
No. Valves 14 P Full Pressure Attained 89 sec P
Manual Chokes 1 P Blind Switch Covers: All stations Yes
Hydraulic Chokes 1 P Nitgn. Bottles (avg): 4 @ 2100
Test Results
Number of Failures: Q Test Time: ~ Hours Components tested 28
Repair or replacement of equipment will be made within days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: llLD...rf,}iJiJ.@ªº,ml.ü.'.~.~ª-tQ:Æt~:.\L~~
Remarks:
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
YES
24 HOUR NOTICE GIVEN
X NO
Date
Waived By Lou Gramaldi
8/2/04 Time
Witness
Test start
0000 Finish
0000
Coil Tubing BFL 05/29/03
2000
Nordic 2 BOP 8-3-04.xls
.
ill) !Æ 1
.
FRANK H. MURKOWSKI, GOVERNOR
A'f/.\SIiA. ORAND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Dan Kara
CT Drilling Engineer
ConocoPhillips Alaska, Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Kuparuk 1 C-08Ll
ConocoPhillips Alaska, Inc.
Permit No: 204-111
Surface Location: 1246' SNL, 668' EWL, SEC. 12, TIIN, RI0E, UM
Bottomhole Location: 2422' NSL, 5234' WEL, SEC. 02, Tl1N, R10E, UM
Dear Mr. Kara:
Enclosed is the approved application for permit to redrill the above development well.
The permit is for a new wellbore segment of existing well KRU 1 C-08, Permit No 181-052, API
50-029-20585-00. Production should continue to be reported as a function of the original API number
stated above.
The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and
produce is contingent upon issuance of a conservation order approving a spacing exception.
ConocoPhillips Alaska, Inc. assumes the liability of any protest to the spacing exception that may occur.
This permit to redrill does not exempt you &om obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit. Please provide at least twenty-four (24) hours notice for a representative of the
Commission to witness any required test. Contact the Com . 'on's petroleum field inspector at (907)
659-3607 (pager).
~cer
'- ~ K. Nonn.
Cha~
--
BY ORDER OF THE COMMISSION
DATED thiaO day of July, 2004
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
, STATE OF ALASKA I
ALASKA AND GAS CONSERVATION COM ISSION
PERMIT TO DRILL
20 MC 25.005 JUN 2 1 ')004
1a. Type of work o Drill II Redrill 1b.currentWeIlClass DExploratory IIDevelopmentOil DMultipleZone .
ORe-Entry 0 Stratigraphic Test 0 Service 0 qølf;;t~l?¡n,~t;(3,!~.::Q·!1iOOIEf~¡'t:;':¡ , ,
2. ~~r~~~:;nc.' tï~¡¿lI~/l~~~;'b 5.~~~~::.~~i~~~ç~;2~) 11. WeIlNa~ô~~~~t~:
3. Address: (.2i·¡;tf 6. Proposed Depth: ,3£.z.t'?4 12. Field / Pool(s):
P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 10830' TVD 6507' ss Kuparuk River Field / Kuparuk
4a. Location of Well (Governmental Section): 7. Property Designation: River Oil Pool
Surface: ADL 025649
1246' SNL, 668' EWL, SEC. 12, T11N, R10E, UM
Top of Productive Horizon:
1097' NSL, 4049' WEL, SEC. 02, T11N, R10E, UM
Total Depth:
2422' NSL, 5234' WEL, SEC. 02, T11N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 561672~' y- 5968988" Zone- ASP4
16. Deviated Wells: fJ,fac/ It/Þ P".J,.l.b:!- .,/
Kickoff Depth 6341 ft~J:Maximum Hole Angle 900
E
ß-
"1/ ;}Ù
8. Land Use Permit:
13. Approximate Spud Date:
08/15/04
9. Acres in Property:
2560
14. Distance to Nearest Property:
13150'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 94' feet 1540' away from 1 B-12 '
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.0;35)
Downhole: 3400 ~ psig Surface: 2754 ;/ psig
Hole Casing
4-1/8" x 3-3/4" 2-7/8"
Weight
6.4#
Grade Coupling Length MD TVD MD TVD (including stage data)
L-80 STL 730' 10100' 6482' 10830' 6507' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD
9791 7109 NIA 9682' 7022'
Structural
Conductor 80' 16" 425 sx Arcticset II 80' 80'
Surface 2714' 10-3/4" 3125 sx Arcticset II 2714' 2587'
Intermediate
Production 9767' 7" 974 sx Arcticset II 9767' 7090'
Liner
Perforation Depth MD (ft): 8927' - 9122'
~
20. Attachments Filing Fee, $100 a BOP Sketch
LJ Property Plat 0 Diverter Sketch
IPerfOration Depth TVD (ft): 6433' - 6582'
a Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report a Drilling Fluid Program a 20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Dan Kara Title CT Drilling Engineer
r
Si~nature (___ Phone 564-5667
Date:
Contact Dan Kara, 564-5667
Permit To Drill I I . .\ API Number:
Number: ;2()'-(- II I 50- 029-20585-60-00
Conditions of Approval: Sam~ equired 0 Yes t:i'Ño
Hy oge Sulfide Measures !8'Ves 0 No
~S-\- v-~ ~ \c.t'-~"
Date 4~ 10'l
Prepared By Name/Number:
Sondra Stewman, 564-4750
Permit Approval
Date:
Mud Log Required
Directional Survey Required
See cover letter for
other requirements
o Yes ~o
~Yes 0 No
'-
ORIG1NAL
~~~~g~~~'DN Date 1;~ Iu ,-//
sL-~t t ~~'icate
.
.
Kara, Danny T
I
From:
Sent:
To:
Subject:
Venhaus, Dan E [Dan.E.Venhaus@conocophillips.com]
Friday, June 18, 2004 9:36 AM
Kara, Danny T
Permit authorization
Dan,
This is the standard verbage that we have forwarded to AOGCC in the past
authorizing permit delivery to BP:
The Kuparuk CTD program starting up in August 2004 consists of 5 wells. The
proposed wells are lC-08A, lY-24A, ID-30A, IF-18A, #5 TBD and will be drilled
with
BP's Nordic 2 CTD unit and managed through BP's CT drilling organization.
BP's CT drilling services are being proviq~d ~o..the OpE;ratpJ;"!co~pçp.t>Þ.~lJ..ips,
via a Shared Service operation. As such, ConOcðPhillips authörizes ~ ....
delivery of these permits to BP (Terry Hubble). ConocoPhillips does request
that BP provide a copy of the approved permits for COP's files (Sharon Allsup-
Drake) .
If you need anything else, let me know.
Dan Venhaus
ConocoPhillips AK Wells
(907)263-4372 office
(907}230-0188 cell
1
lu 1 C-08L 1 &L2 Sidetrack - Coiled -Ing Drilling
Summary of Operations:
Coiled tubing drilling will sidetrack KRU IC-08 using the dynamically overbalanced coiled tubing drilling
(DOCTD) technique (see description below). This horizontal laterals (lC-08Ll & L2) will target Kuparuk C
sand reserves for production. The Kuparuk C Sand and A Sand perforations in the existing well, lC-08 will not v
be abandoned and will be open to flow post CTD.
Prior to arrival of the Nordic 2 CTD rig, a rig workover will be performed to swap the tubing to 4-1/2" 12.6# L-
80. This workover will be done by ConocoPhillips Alaska.
CTD Drill and Complete 1C-08L1 & L2 pr02ram: Planned for AU2ust 15. 2004
1. Pre CTD install mechanical whipstock at 8930'
2. MIRU Nordic 2. NU 7-1/16" BOPE, test.
3. Mill 3.80" window at 8930' md and 10' of openhole.
4. Drill 4. 125"x3.75" bicenter hole horizontal sidetrack lC-08Ll from window to -10830' TD targeting
Kuparuk C 1 sand interval.
5. Run and drop a 2-7/8" slotted (pre-drilled) liner from TD of 10830', up to 10100' md.
6. Openhole sidetrack at 10830' in L 1, above the 2-7/8" liner.
7. Drill 3.75" horizontal sidetrack lC-08L2 from open-hole side track to - !! 720' TD targeting Kuparuk C4
sand interval.
8. Complete with 3-3/16" x 2 7/8" pre-drilled liner from the TD of L2 at ! 1720', up into the 4-1/2" tubing to
- 8810'.
9. Post CTD rig -Run GL V s. Bring on production.
Mud Program:
· Steps 1: 8.9 ppg Potassium-Formate biozan brine
· Steps 2-3: Potassium-Formate based Flo-Pro (8.9 ppg)
Disposal:
· No annular injection on this well.
· Class II liquids to KRU lR Pad Class II disposal well
· Class II drill solids to Grind & Inject at PBU Drillsite 4
· Class I wastes will go to Pad 3 for disposal.
Casing Program:
· Ll: 27/8",6.4#, L-80, STL slotted liner from 10830' md - 10100' md
· L2: 3-3/16" 6.2# L-80 TCII solid pipe from 8810' md to 9900' md.
· L2: 27/8", 6.4#, L-80, STL slotted liner from 9900' md to TD at 11720' md
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 4500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plans for lC-08Ll & L2
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. v
Logging
· A Gamma Ray log will be run over all of the open hole section.'/
· Resistivity logs will be recorded over limited sections of openhole. .
Kara 564-5667 office, 240-8047 cell
1/3
. 1 C-08L 1 &L2 Sidetrack - Coiled T.ng Drilling
Hazards
. One mapped fault in in the direction of the well path; lost circulation risk is low, especially while DOCTD.
Reservoir pressure is estimated to be 10.1 ppg in the fault block. W ell 1 C-08 has a H2S reading of 65 ppm
(measured 08/28/03). The highest H2S on 1C pad was measured at 232 ppm (lC-123, 8/04/02). 1C is an
H2S pad. All H2S monitoring equipment will be operational.
Reservoir Pressure
· Reservoir pressure is approx. 3400 psi at 6460' TVD 10.1 ppg EMW. Max. surface pressure with gas (0.1
psi/ft) to surface is 2754 psi.
Dynamically overbalanced coiled tubing drilling (DOCTD) techniques will be employed to address high
reservoir pressure. Plans are to use 8.9 ppg drilling fluid in combination with annular friction losses and
applied surface pressure to maintain overbalanced reservoir conditions. A hydraulic choke for regulating
surface pressure will be installed between the BOPE choke manifolding and the mud pits and will be
independent of the BOPE choke.
Using this technique with an underbalanced mud weight requires deployment of the BHA under trapped
wellhead pressure. Deployment will be accomplished utilizing the BOP pipe/slips (2-3/8" rams, see attached
BOP configuration), and/or the tested tubing retrievable sub-surface safety valve. The annular preventer will
act as a secondary containment during deployment and not as a stripper. At least two times hole volume of
kill weight fluid will be on location as a contingency.
The first pre-drilled line will be deployed above a closed tubing retrievable sub-surface safety valve. Once
dri11ing of L2 is complete, the production liner will be deployed into the wellbore after ki11ing the well with
kill weight fluid.
Estimated reservoir pressure: 3400 psi at 6460' TVD, 10.1 ppg EMW.
Expected annular friction losses while circulating (ECD): 400-500 psi
Planned mud density: 8.9 ppg equates to 2990 psi hydrostatic bottom hole pressure.
While circulating 8.9 ppg fluid, bottom hole circulating pressure is estimated to be 3400-3500 psi
When circulation is stopped, a minimum of 400-500 psi surface pressure will be applied to balance the
reservolr.
Operating parameters and fluid densities wi11 be adjusted based on real-time bottom hole pressure
measurements while drilling.
Kara 564-5667 office, 240-8047 cell
2/3
.U 1 C-08L 1 &L2 Sidetrack - Coiled .ing Drilling
Kuparuk IC-OS LI&L2
Potential Drilling Hazards
POST ON RIG
1. Please perfonn pre-job Hazard ID and Safety meetings prior to every change in work scope during
the operation. Also, ifthings don't feel right shut-down the operation and discuss the situation
before making the next operational move. SAFETY FIRST.
2. H2S - WelllC-08 produces H2S at 65 ppm (measured 08/28/03). The highest H2S on lC pad was
measured at 232 ppm (lC-23, 08/04/02). lC is an H2S pad. H2S procedures must be followed
according to the AK Safety Handbook and Shared Services Drilling H2S SOP. All personnel
must be supplied with required PPE and H2S certified. Influxes of reservoir fluid could result in
H2S in the pit area, although KRU CTD sidetracks have not seen this in the past. The Pit watcher
should always carry a calibrated personal H2S monitor.
3. Reservoir pressure - Reservoir pressure is estimated at 3400 psi @ 6460' TVD (10.1 ppg) in the
adjacent fault blocks that will be penetrated with this well plan. Max. surface pressure with gas (0.1
psi/ft) to surface is 2754 psi. Reservoir frac gradient is -0.7 psi/ft or 13.5 EMW, 4525 psi.
4. The Dynamically Overbalanced Coiled Tubing Drilling (DOCTD) technique will be used.
Drilling will be done with a less than kill-weight fluid (8.9 ppg PIo-Pro). While drilling and
circulating, hydrostatic head from the 8.9 ppg mud (2990 psi), plus 400-500 psi of annular friction,
plus 0 psi choked backpressure held on the return side will provide a 3400-3500 psi BHP and
overbalance the reservoir by -100 psi. However, when circulation is shut down, the reservoir could
be underbalanced by 400-500 psi. Maintain at least 400 psi WHP when not circulating to prevent
reservoir in-flux and to maintain fonnation stability by keeping static BHP close to circulating BHP
seen during drilling. Adjust SIWHP accordingly when BHP increases are seen on the downhole
PWD sub. Increases will occur from higher-than-expected friction pressures and/or reservoir
pressures. Refer to the PWD BHP vs Depth chart to detennine if deviations occur. Monitor return-
line flow rate and pit volume continuously. If a pit gain has been identified (underbalance event
occurred), divert those returns to an outside tank.
5. No gas saturated intervals are expected. However, always be prepared for the potential for gas
influx. Ensure all PVT equipment is fully operational and monitor return-line flow rate and pit
volume continuously.
6. Lost circulation is not expected. One fault shold be encountered along the wellbore trajectory. The
faults are sealing and lost circulation is considered low risk. If lost circulation occurs plan to control
it with adjustments to the DOCTD parameters. Lower circulation rate would be utilized prior to
LCM treatments. However, as a contingency ensure that LCM material is on location so that a pí11
could be mixed quickly if required.
Kara 564-5667 office, 240-8047 cell
3/3
lu 1 C-08L 1 &L2 Sidetrack - Coiled ,ng Drilling
Hazards
. One mapped fault in in the direction of the well path; lost circulation risk is low, especially while DOCTD.
Reservoir pressure is estimated to be 10.1 ppg in the fault block:' Well lC-08 has a H2S reading of 65 ppm
(measured 08/28/(3). The highest H2S on lC pad was measured at 2,32 ppm (lC-123, 8/04102). lC is an
H2S pad. All H2S monitoring equipment will be operational.
Reservoir Pressure .
. Reservoir pressure is approx. 3400 psi at 6460' TVD 10.lppg EMW. Max. surface pressure with gas (0.1
psilft) to surface is 2754 psi. .' /
G(;>-S/I
Dynamically overbalanced coiled tubing drilling (riOCTD) techniques will be employed to address high
reservoir pressure. Plans are to use 8.9 ppg driµ{ng fluid in combination with annular friction losses and
applied surface pressure to maintain overbala¡iced reservoir conditions. A hydraulic choke for regulating
surface pressure will be installed between tJ:le BOPE choke manifolding and the mud pits and will be
independent of the BOPE choke. /
/
/
Using this technique with an underbaµfnced mud weight requires deployment of the BHA under trapped
wellhead pressure. Deployment wiIYbe accomplished utilizing the BOP pipe/slips (2-3/8" rams, see attached
BOP configuration), and/or the te~ed tubing retrievable sub-surface safety valve. The annular preventer will
act as a secondary containment d(Íring deployment and not as a stripper. At least two times hole volume of
kill weight fluid will be on location as a contingency. ./
J
/
The first pre-drilled line wµ1' be deployed above a closed tubing retrievable sub-surface safety valve. Once
drilling of L2 is complete/the production liner will be deployed into the wellbore after killing the well with
kill weight fluid. ;.
/
Estimated reservoir iessure: 3400 psi at 6460' TVD, 10.1 ppg EMW. v'
Expected annular friction losses while circulating (ECD): 400 psi
Planned mud denJÎty: 8.9 ppg equates to 2990 psi hydrostatic bottom hole pressure.
While circulati~ 8.9 ppg fluid, bottom hole circulating pressure is estimated to be 2900 psi
When circulrn is stopped, a minimum of 400 psi surface pressure will be applied to balance the reservoir.
Operating / rameters and fluid densities will be adjusted based on real-time bottom hole pressure
measure nts while drilling.
Kara 564-5667 office, 240-8047 cell
2/3
lu 1 C-08L 1 &L2 Sidetrack - Coiled "ng Drilling
Kuparuk 3N-18Ll&L2
Potential.DriUing Hazards
c~?J
7,,~6GI POST ON RIG
IJ~
1. Please perform pre-job Hazard ID and Safety meetings prior to every chang~ìn work scope during
the operation. Also, if things don't feel right shut-down the operation an<;ldiscuss the situation
before making the next operational move. SAFETY FIRST.
2. H2S - We\13N-18 produces H2S at 110 ppm (measured 12/30/02). The highest H2S on 3N pad was
measured a~J56ppm (3N-02, 12/31/02). 3N is an H2S pad. H2S procedures must be followed
according to the AK Safety Handbook and Shared Services Drilling H2S SOP. All personnel
must be supplied with required PPE and H2S certified. Influxes of reservoir fluid could result in
H2S in the pit area, although KRU CTD sidetracks have not seen this in the past. The Pit watcher
should always carry a calibrated personal H2S mon.itor.
3. Reservoir pressure - Reservoir. pressure is estimated at 3800 psi @ 6500'ss, 6568' TVD (11.1 ppg)
in the adjacent fault blocks that will be penetrated with this well plan. Max. surface pressure with
gas (0.1 psi/ft) to surface is 3150 psi. Reservoir frac gradient is -0.7 psi/ft or 13.5 EMW, 4600 psi.
4. The Dynamically Overbalanced Coiled Tubing Drilling (DOCTD) technique will be used.
Drilling will be done with a less than kill-weight fluid (8.5 ppg PIo-Pro). While drilling and
circulating at 1.5 BPM, hydrostatic head from the 8.5 ppg mud (2900 psi), plus 1000 psi of annular
friction, plus 0 psi choked backpressure held on the return side will provide a 3900 psi BHP and
overbalance the reservoir by -100 psi. However, when circulation is shut down, the reservoir could
be underbalanced by -900 psi. Maintain at least 900 psi WHP when not circulating to prevent
reservoir in-flux and to maintain formation stability by keeping static BHP close to circulating BHP
seen during drilling. Adjust SIWHP accordingly when BHP increases are seen on the downhole
PWD sub. Increases will occur from higher-than-expected friction pressures and/or reservoir
pressures. Refer to t4é PWD BHP vs Depth chart to determine if deviations occur. Monitor return-
line flow rate and pWvolume continuously. If a pit gain has been identified (underbalance event
occurred), divert those returns to an outside tank.
5. No gas saturated intervals are expected. However, always be prepared for the potential for gas
influx. Ensurè all PVT equipment is fully operational and monitor return-line flow rate and pit
volume con~inuously.
6. Lost cir~lation is not expected. Two faults are expected to be encountered along the wellbore
trajectqfy. The faults are sealing and lost circulation is considered low risk. If lost circulation
occur I plan to control it with adjustments to the DOCTD parameters. Lower circulation rate (1
BP minimum) would be utilized prior to LCM treatments. However, as a contingency ensure that
L material is on location so that a pill could be mixed quickly if required. Pump only Liquid
asing or OM Seal fine through a slimhole drilling BHA. Do not pump MI Seal through a drilling
HA due to plugging potential.
Kara 564-5667 office, 240-8047 cell
3/3
Gas Lift
MandrelNalve
1
(2377-2378.
Gas Lift
MandrelNalve
2
(4469-4470,
Gas Lift
MandrelNalve
4
(6452-6453.
Gas Lift
MandrelNalve
5
(7195-7196.
Gas Lift
Valve
(7995-7996.
0005391)
Gas Lift
PBR
(8724-8725,
OD:3.500)
PKR
(8737-8738.
OD:6.156)
NIP-
(8774-8775.
00:3.500)
TUBING
SOS
(8808-8809.
00:3.500)
Perf
(8927-9012)
Perf
(9018-9030)
Perf
(9096-9122)
Gas Lift
SSSV ---
Valve
Inc.
KRU
1 C-08
iC-OS
Angle @J§;j40 deQ @ 8928 I
Angle @ TO: 137 deg @ 9791 -----¡
API: 500292058500 _--1____ Well TY~ PROº----___
SSSVType: LOCKED OUT i Ori_g [5/16/1981
¡ Completion: I
Annular Fluid: _~.______~~-LastW/O: 3/14/1990
Loç¡:~_~ ¡ Ref l,oç¡ Date: I
19113 1 TO:ì9767ftKB
ate: 5/17/2004 ~J¡!ax Hole Angle: 157 deq @
ALL
Rev Re_ason:
Last Update:
Description
CONDUCTOR
Bottom TVD
0 80 80
0 2714 2587
0 9767 9767
TVD Wt Grade
6342 9.20 J-55
Date
5/16/1981
4 5/16/1981 ¡PERF
4 5/16/1981 ¡PERF
Comment
---..._---_.~--_._'-----~"~,_._---~----~
-~-~--~~-,~~-~,.__.._.~~-----"--~~
.
.
KRU 1 C-08A Producer
Proposed Completion
u
3-3/16" liner top @
+/-8810' MD
ConocJPt,illips
Alaska, Inc.
I. 4-1/2" 5M FMC tubing hanger with 4-1/2" L-80 IBT-mod pin down.
H. 4-1/2" 12.6# L-80 IBT Mod Tubing to surface.
G. 4-1/2" Cameo 'TRM' SSSV set at +1-2100' MD, 3.813" ID
F. 4-1/2" 12.6# L-80 IBT Mod tubing to 'X' landing nipple wI 4-1/2" x 1" Cameo
'KBG-2' mandrels wI DVs, spaced out as follows:
10-3/4" 45.5# ~ .QLMtt .MD. r&
55 @ 2714"
1 2734' 2600'
2 4592' 3800'
3 6002' 4650'
4 7080' 5300'
5 7909' 5800'
----
Top of Flowthru
Whipstock & KOP at
+/-8930' MD
Window in 7"
~ C4-Sand
;jt. C1-Sand~
Fill
7" 26# J-55 @
9767 MO'
Note: Each GLM should have 10' L-80 handling pups installed on top and bottom.
E. 4-112" x 1" Cameo 'KBG-2' Mandrel at +1-$630' MO wI DCK Dump Kill Valve (2000 psi casing to
tubing shear). 10' L-80 handling pups installed on top and bottom of mandrel.
D. 1 joint 4-1/2" 12.6# L-80 IBT Mod Tubing
C. Baker 4-1/2" SABL packer at +1-$670' MO with PBR/seal assembly. 4" ID bore
B. 4-1/2" HES 'X' selective landing nipple with 3.813"10 at +/-8815' MO (necessary for 3.8" CTO bits)
A. 4-1/2" wireline entry sub at +1-8820' MD
4-118" open hole
/
3-3/16" X 2-7/8" crossover @
9900'
I
C3/C4 Lateral, TD @ 11720' md
o
o
o
oj)
o
o
o
o
o
Open hole KOP @ 10,100' md
./
C1lateral, TD @ 10830' md
2-718" pre-drilled liner
DEV 6/2/04
Plan: Plan #8 (OB/Plan #8 1C-08L1
Created By: Mel Rixse Date: 09/066/2004
Azimuths to True North
Magnetic North: 24.83'
ic Field
. v7557nT
ngle: 80.79'
Date: 09/066/2004
Model: bggm2003
M
T
ConocoPhiHips Alaska Inc.
WELLPATH DETAILS
Þlan#8iC-08L1
P...renf Wellpatb: iC-OS
TI." Olt MDt 89$O.{)O
Rig, Nordiç:!; 94.000
Ref. Datwrn: W<llflhøad(94:¡
V.s"'Cti(lfl O:t?t:~ ~~~ Starting
Angle Fl'<!'mTVD
318.00' 0.00 G,OO ..M
REFERENCE INFORMATION 3700
3600
3500
3400
3300
I
....
ª 3200
~
:; 3100
....
+,,3000
f 2900
o
Z 2800
-.
.....
.
:ë2700
....
g 2600
m
2500
2400
2300
2200
2100
-6300 -6200 -61 00 -6000 -5900 -5800 -5700 -5600 -5500 -5400 -5300 -5200 -51 00 -5000 -4900 -4800 -4700 -4600 -4500 -4400 -4300 -4200 -41 00 -4000 -3900 -3800 -3700
West(-)/East(+) [50ft/in]
4800 4850 4900 5000 5050 5100
08/09/2004 53 PM
5850
5900
5950
6000
....
.5 6050
;;;.
èS 6100
m
....6150
.s:;:
...
t6200
~
m 6250
fI'I
.Q
:::!
CIJ
~aker Hughes Incorporat!
INTEQ Planning Report
'I/>~~Ilf.
.» .WeIIJ.i~i
'Î===~~"-~-'--------'--:·---'--:-=----'------·---·---·---------------.------------------,
I Field: Kuparuk River Unit !
I North Slope, Alaska ['
, USA
I Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 I
l Goo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre J
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2003
_.-..._...._-.-_._--------~._-,_._,._---- ---'---- ._----~----~._-~------~---
ISit;--- Pad1C-------------------
I
i North Slope, Alaska
I Site Position: Northing: 5970228.13 ft Latitude: 70 19 45.173 N
: From: Map Easting: 560993.64 ft Longitude: 149 30 19.124 W
I Position Uncertainty: 0.00 ft North Reference: True
l~'()und.Lev~________~~_~~_____________~rid Con~ergence:___ 0.47 deg _________"
-W;I~--08-------------- ---Slot Nam~------------------l
·--------------·-----·-l
I
Well Position: +N/-S -1245.87 ft ~Northing: 5968987.86 ft
+E/-W 668.58 ft Easting: 561672.26 ft
i _ POs~lJ~yncertainty_=___~.O~~_.
Latitude:
Longitude:
70 19 32.920 N
149 29 59.608 W
--~'---
Well path: Plan #8 1C-08L 1
Height
94.00 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
-1
I
I
80.79 degJ,
Direction
deg
318.00·-------- j
--.--._.....__._-,_._------_.-._------~-
.__.~--~._._---
Wellhead(94'}
09/066/2004
57557 nT
Depth From (fVD)
ft
--.'_.._--_...._._-----_.._._--~----
L________O.OO________~~___
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
Annotation
1 C-08
8800.00 ft
Mean Sea Level
24.83 deg
+N/-S
ft
I
I
___________J
IP¡;;~_;_-Plan #8 -------------I>;te composed:--09/066/20Ô4 ----I
.\ Version: 2 I
Principal: Yes Tied-to: From: Definitive Path I
I___..__.,_____".__.~_...___._____.__.,_______ ~____.___~_,.J
8800.00
>1"8930.00
8950.00
9077.12
9275.00
9375.00
9475.00
9750.00
9925.00
9980.00
10380.00
10530.00
10829.74
6241.92
6341.36
6356.49
6406.98
6406.98
6406.98
6410.35
6453.29
6474.44
6475.98
6495.88
6500.73
6507.14
TIP
KOP
3
4
5
6
7
8
9
10
11
12
rD
- -_._,_.-._-_._--_._-_._._.._--_.._~---~-
Plan Section Information
8800.00 40.25 310.40 6241.92 2308.56 -4676.30 0.00 0.00 0.00 0.00
8900.00 40.00 312.40 6318.38 2351.17 -4724.64 1.31 -0.25 2.00 101.74
8930.00 40.00 312.58 6341.36 2364.19 -4738.86 0.39 0.00 0.60 90.07
8950.00 41.70 313.51 6356.49 2373.12 -4748.42 9.00 8.48 4.63 20.00
9077.12 90.00 313.51 6406.98 2450.63 -4830.07 38.00 38.00 0.00 0.00
9275.00 90.00 343.19 6406.98 2617.19 -4932.76 15.00 0.00 15.00 90.00
9375.00 90.00 328.19 6406.98 2708.07 -4973.82 15.00 0.00 -15.00 -90.00
9475.00 86.16 342.70 6410.35 2798.70 -5015.25 15.00 -3.84 14.51 105.00
9750.00 76.60 302.04 6453.29 3009.85 -5176.45 15.00 -3.47 -14.78 254.00
9925.00 89.67 279.05 6474.44 3069.83 -5337.85 15.00 7.47 -13.14 298.00
9980.00 87.13 271.20 6475.98 3074.74 -5392.56 15.00 -4.62 -14.28 252.00
-.-'.-"'..-- -~_.."_.,.~----"----,----,._."---------------_._---"------~_.._-_._,-_.__.__._--_..---'--
ttaker Hughes Incorporat!
INTEQ Planning Report
Plan Section Information
10380.00 87.70 331.27 6495.88 3272.57 -5718.70 15.00 0.14 15.02 91.00
110530.00 88.64 353.76 6500.73 3414.65 -5763.46 15.00 0.63 14.99 88.00
. 10830.00 89.04 308.75 6507.14 3670.90 -5904.03 15.00 0.13 -15.00 -90.00
1__...______..._________.__ --_._-._-'----,.__.._-~--_._,.__._----~_.,~-_._~-~_...,-----~._--,-_.- --------
Survey
8800.00 40.25 310.40 6241.92 2308.56 -4676.30 5971257.69 556977.59 0.00 0.00
8900.00 40.00 312.40 6318.38 2351.17 -4724.64 5971299.90 556928.91 1.31 101.74
8930.00 40.00 312.58 6341.36 2364.19 -4738.86 5971312.80 556914.59 0.39 90.07
8950.00 41.70 313.51 6356.49 2373.12 -4748.42 5971321.65 556904.96 9.00 20.00
8960.00 45.50 313.51 6363.73 2377.87 -4753.42 5971326.36 556899.92 38.00 0.00
8970.00 49.30 313.51 6370.50 2382.93 -4758.75 5971331.38 556894.54 38.00 0.00
8980.00 53.10 313.51 6376.77 2388.30 -4764.40 5971336.69 556888.84 38.00 0.00
8990.00 56.90 313.51 6382.50 2393.94 -4770.34 5971342.28 556882.86 38.00 0.00
9000.00 60.70 313.51 6387.68 2399.82 -4776.55 5971348.12 556876.61 38.00 0.00
9010.00 64.50 313.51 6392.28 2405.93 -4782.99 5971354.17 556870.12 38.00 0.00
9020.00 68.30 313.51 6396.29 2412.24 -4789.63 5971360.43 556863.43 38.00 0.00
9030.00 72.10 313.51 6399.68 2418.72 -4796.45 5971366.85 556856.55 38.00 0.00
9040.00 75.90 313.51 6402.43 2425.33 -4803.42 5971373.40 556849.53 38.00 0.00
9050.00 79.70 313.51 6404.55 2432.06 -4810.51 5971380.07 556842.38 38.00 0.00
9060.00 83.50 313.51 6406.01 2438.87 -4817.69 5971386.82 556835.15 38.00 0.00
9070.00 87.30 313.51 6406.81 2445.73 -4824.91 5971393.62 556827.87 38.00 0.00
9077.12 90.00 313.51 6406.98 2450.63 -4830.07 5971398.48 556822.67 38.00 0.00
9100.00 90.00 316.94 6406.98 2466.87 -4846.19 5971414.58 556806.42 15.00 90.00
9125.00 90.00 320.69 6406.98 2485.68 -4862.65 5971433.26 556789.81 15.00 90.00
9150.00 90.00 324.44 6406.98 2505.53 -4877.84 5971452.97 556774.46 15.00 90.00
9175.00 90.00 328.19 6406.98 2526.32 -4891.71 5971473.66 556760.42 15.00 90.00
9200.00 90.00 331.94 6406.98 2547.99 -4904.18 5971495.21 556747.77 15.00 90.00
9225.00 90.00 335.69 6406.98 2570.42 -4915.21 5971517.55 556736.56 15.00 90.00
9250.00 90.00 339.44 6406.98 2593.52 -4924.75 5971540.57 556726.83 15.00 90.00
9275.00 90.00 343.19 6406.98 2617.19 -4932.76 5971564.18 556718.63 15.00 90.00
9300.00 90.00 339.44 6406.98 2640.87 -4940.77 5971587.79 556710.43 15.00 270.00
9325.00 90.00 335.69 6406.98 2663.98 -4950.31 5971610.81 556700.70 15.00 270.00
9350.00 90.00 331.94 6406.98 2686.41 -4961.34 5971633.15 556689.48 15.00 270.00
9375.00 90.00 328.19 6406.98 2708.07 -4973.82 5971654.70 556676.83 15.00 270.00
9400.00 89.03 331.81 6407.19 2729.71 -4986.31 5971676.24 556664.16 15.00 105.00
9425.00 88.06 335.43 6407.82 2752.10 -4997.42 5971698.53 556652.87 15.00 104.97
9450.00 87.11 339.06 6408.88 2775.13 -5007.07 5971721.48 556643.03 15.00 104.88
9475.00 86.16 342.70 6410.35 2798.70 -5015.25 5971744.98 556634.66 15.00 104.72
9500.00 85.13 339.08 6412.25 2822.25 -5023.41 5971768.47 556626.31 15.00 254.00
9525.00 84.13 335.45 6414.59 2845.21 -5033.02 5971791.34 556616.51 15.00 254.27
9550.00 83.15 331.81 6417.36 2867.46 -5044.06 5971813.50 556605.29 15.00 254.61
9575.00 82.19 328.15 6420.55 2888.93 -5056.46 5971834.86 556592.72 15.00 255.02
9600.00 81.27 324.48 6424.15 2909.51 -5070.17 5971855.33 556578.83 15.00 255.48
9625.00 80.38 320.79 6428.14 2929.13 -5085.15 5971874.82 556563.70 15.00 256.01
9650.00 79.53 317.08 6432.50 2947.68 -5101.31 5971893.24 556547.38 15.00 256.60
9675.00 78.72 313.35 6437.21 2965.11 -5118.61 5971910.52 556529.95 15.00 257.25
9700.00 77.97 309.60 6442.27 2981.32 -5136.95 5971926.58 556511 .48 15.00 257.95
9725.00 77.26 305.83 6447.63 2996.26 -5156.26 5971941.35 556492.05 15.00 258.71
9750.00 76.60 302.04 6453.29 3009.85 -5176.45 5971954.78 556471.74 15.00 259.52
9775.00 78.39 298.66 6458.70 3022.18 -5197.52 5971966.93 556450.58 15.00 298.00
9800.00 80.21 295.32 6463.35 3033.32 -5219.40 5971977.90 556428.61 15.00 298.73
---_._--_.._-_..._----_._---._--_..-~ _._----~- --------...._---',-----
· .
Baker Hughes Incorporated
INTEQ Planning Report
Survey
9825.00 82.06 292.02 6467.20 3043.24 -5242.02 5971987.62 556405.91 15.00 299.35
9850.00 83.94 288.75 6470.25 3051.88 -5265.27 5971996.07 556382.59 15.00 299.86
9875.00 85.84 285.51 6472.48 3059.21 -5289.07 5972003.21 556358.74 15.00 300.26
9900.00 87.75 282.28 6473.88 3065.20 -5313.29 5972009.00 556334.46 15.00 300.55
9925.00 89.67 279.05 6474.44 3069.83 -5337.85 5972013.42 556309.87 15.00 300.73
9950.00 88.51 275.49 6474.84 3072.99 -5362.64 5972016.38 556285.06 15.00 252.00
9975.00 87.36 271.91 6475.74 3074.60 -5387.57 5972017.79 556260.12 15.00 252.06
9980.00 87.13 271.20 6475.98 3074.74 -5392.56 5972017.88 556255.13 15.00 252.19
10000.00 87.08 274.20 6476.99 3075.68 -5412.51 5972018.66 556235.17 15.00 91.00
10025.00 87.03 277.96 6478.27 3078.33 -5437.33 5972021.10 556210.33 15.00 90.85
10050.00 86.99 281.71 6479.58 3082.59 -5461.93 5972025.16 556185.71 15.00 90.66
10075.00 86.97 285.47 6480.89 3088.46 -5486.19 5972030.83 556161.40 15.00 90.46
10100.00 86.96 289.22 6482.22 3095.90 -5510.02 5972038.07 556137.52 15.00 90.26
10125.00 86.96 292.98 6483.54 3104.88 -5533.30 5972046.87 556114.16 15.00 90.06
10150.00 86.98 296.73 6484.87 3115.38 -5555.95 5972057.17 556091.43 15.00 89.86
10175.00 87.01 300.49 6486.18 3127.33 -5577.86 5972068.94 556069.42 15.00 89.67
10200.00 87.05 304.24 6487.47 3140.69 -5598.95 5972082.13 556048.23 15.00 89.47
10225.00 87.10 308.00 6488.75 3155.41 -5619.11 5972096.68 556027.94 15.00 89.27
10250.00 87.17 311.75 6490.00 3171.41 -5638.27 5972112.53 556008.66 15.00 89.08
10275.00 87.25 315.51 6491.22 3188.64 -5656.34 5972129.60 555990.45 15.00 88.89
10300.00 87.34 319.26 6492.40 3207.01 -5673.25 5972147.83 555973.39 15.00 88.71
10325.00 87.44 323.01 6493.54 3226.46 -5688.91 5972167.14 555957.57 15.00 88.53
10350.00 87.55 326.76 6494.63 3246.88 -5703.28 5972187.45 555943.04 15.00 88.36
10375.00 87.67 330.52 6495.68 3268.21 -5716.27 5972208.67 555929.87 15.00 88.20
10380.00 87.70 331.27 6495.88 3272.57 -5718.70 5972213.01 555927.40 15.00 88.04
10400.00 87.81 334.27 6496.66 3290.34 -5727.85 5972230.70 555918.11 15.00 88.00
10425.00 87.95 338.02 6497.59 3313.18 -5737.95 5972253.46 555907.82 15.00 87.88
10450.00 88.10 341.76 6498.45 3336.64 -5746.54 5972276.84 555899.04 15.00 87.74
10475.00 88.26 345.51 6499.24 3360.61 -5753.58 5972300.75 555891.81 15.00 87.61
10500.00 88.43 349.26 6499.96 3385.00 -5759.03 5972325.09 555886.15 15.00 87.50
10525.00 88.60 353.01 6500.61 3409.68 -5762.88 5972349.74 555882.10 15.00 87.39
10530.00 88.64 353.76 6500.73 3414.65 -5763.46 5972354.70 555881.48 15.00 87.29
10550.00 88.64 350.76 6501.21 3434.46 -5766.15 5972374.49 555878.63 15.00 270.00
10575.00 88.65 347.01 6501.80 3458.98 -5770.97 5972398.96 555873.61 15.00 270.07
10600.00 88.66 343.25 6502.38 3483.13 -5777.38 5972423.06 555867.00 15.00 270.16
10625.00 88.68 339.50 6502.96 3506.81 -5785.36 5972446.67 555858.82 15.00 270.25
10650.00 88.71 335.75 6503.53 3529.92 -5794.88 5972469.70 555849.12 15.00 270.33
10675.00 88.74 332.00 6504.09 3552.36 -5805.88 5972492.04 555837.94 15.00 270.42
10700.00 88.77 328.25 6504.64 3574.03 -5818.33 5972513.61 555825.32 15.00 270.50
10725.00 88.81 324.50 6505.16 3594.83 -5832.16 5972534.30 555811.31 15.00 270.59
10750.00 88.86 320.75 6505.67 3614.69 -5847.33 5972554.03 555795.98 15.00 270.66
10775.00 88.91 317.00 6506.16 3633.52 -5863.77 5972572.72 555779.39 15.00 270.74
10800.00 88.97 313.25 6506.62 3651.23 -5881.40 5972590.28 555761.61 15.00 270.81
10825.00 89.03 309.50 6507.06 3667.75 -5900.16 5972606.64 555742.72 15.00 270.88
\1'10830.00 89.04 308.75 6507.14 ./ 3670.90 -5904.03 5972609.76 555738.82 15.00 270.95
Well
-
BOP-Tree
I, I
,
·
·
I
v
1
I,
I
·
I,
I,
.
Swab Valve .
I
Tree Size
I
I ssv I
I.
·
l, Master Valve I
·
Base Flange .
l .
Page 1
T12N
T11N
~ 1 C-08
CTO out of 1 C-08
T1
SW Y4 Section 2
~ - - ~ --~----~~--~-~---~--------~------------~--~~----~-l
I
j
!
! .
!
!
I
!
!
¡
!
I
3
1
1
SONDRA D STEWMAN
BP EXPLORATION AK INC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
89-611252 104
"Mastercard Check"
DA TE (í)~ Z-' ~Cf/
I $ IOO.(J)--
PAY TO THE Ar--.r /'If'
ORDER OF l ~~( ~
Dr1e- \\ "-Jr~~.(LGY\cL~~
First Natio~~ ~Ia$ka
Anchorage, AK 99501
ME~tvl;+ KuP \ t -(1< LI\L7J
DOLLARS
I: ;I. 2 5 2000 b 0.: q q ;I. ~ I" b 2 2 ? "' ;I. 5 b ~ II- O. 0 ~
.
.
.
.
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME /:::/ca / (! - ðB L/
PTD# 20 C/' -- 1/(
v' Development
Service
CHECK WBA T
APPLŒS
ADD-ONS
(OPTIONS)
MULTI
LATERAL
/'
(If API number
last two (2) digits
are between 60-69)
Exploration
Stratigraphic
"CLUE".
Tbe permit is for a,new weUbore segment of !
existing well kR~( Ie ·~ðB , ...,..__
Permit No, ì1rl·ö$ZAPI No. 5'O-D'Z1-;- 2-DS6'5. -c.:f.':)
Production. sbould continue to be reponed as
a function 'of tbe original API number. stated
above.
BOLE In accordance witb 20 AAC 25.005(f), an
records, data and Jogs acquired for tbe pilot
bole must be clearly differentiated 'in both
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and Jogs acquired
for wen (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
vi
DRY DITCH
SAMPLE
The permit is approved subject ·to fuD
compliance witb 20 AAC 25.0SS~ Approval to
perforate and produce is contingent upon
issuance of a conservation o~der appr~ng~,
spacing . exception. (,,;~.·lyf"1u /I F
(Company Name) assumes the liability of any
protest to tbe spacing exception tbat may
occur.
AU dry ditcb sample sets submitted to tbe
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
o
o
Well bore seg
Annular Disposal
On
DEV
On/Off Shore
Program
C-08L 1
Unit 11J60
!;aJld._ fee_not rßQuired.
the Kuparuk "çJ
bore_ is in lease ADL 0256<19.
Name: KUPARUK RIV UNIT
GeoArea 890
Multi-lateral produc~r in
Entire multi-lateral wel
Wel
PEND
DEV
governed_by _CO 4326.
However
Kup_aruk River field. Kuparuk B.iver Ojl POQI
61:1L withjn_ IO~ Qf W bQundary QfAD_L 2564_9,
Greater t/1an WOO' Jromoffset wells,
KB.U 1 C-Oal U!; se_cond weJI þoreopen to
offs_ettin9 leases ;l(ecpmrnitted to_ KRU & KuparukPA.
!h_epOQUn SWX QLSection 2,111/11, B.10¡;:, UM.
!?rQper Þond_nurnÞerJs 59.-52_- t80._
CO ,4328 has no administrative reljeJ
_20Q4~
ruJe~ spaj;ing exception wil/be a _CQ. _Notice puÞHs/1ed June 2t
.
NA
Yes
Yes
Yes
Yes
Yes
No_
Y_es
Yes
Yes
No_
Yes
Yes
NA
NA
NA
_NA
nitial ClasslType
490100
KUPARUK RIVER, KUPARUK RV OIL
NC
CONOCOPHILLlPS AL8SKA
Permit fee aUachej;!
Field & Pool
Company
J-ease number _appropriate_
n_ame _and oumb_er
in_a d_efinej;!POQI
from driJIing unitbQundary_
from Qtber wells
indrilJiog unit
incJu~ed
JQrce
co_nservation Qrder
¡¡dministrati\,fe_ approvaJ
15-day wait
IQcated
IQcated proper _distance_
JQcated prQPer ~istance_
_SJJfficíeot .
Jtdevi¡¡tec
_U_niqlJe welt
Wel
Well
Well
acre¡¡ge _ayailable
is weJlbQre pl¡¡t
_Operator 001)' affected party
_Operator bas_appropria!e_ b_ond Ln
can be issued witbou!
can be issued witbout
be approved before
10# in_ cQmmeots}_ (FQr
njectioo Order # (put
servic_e weU nn'u
t/1an3mor.
'""w,~d withio ¡¡rea ¡¡nd_strataaut/1Qrized by_
'''''''.)
ideotified
"'". ,,.. ""'-' I "'J ..,,..-production less
(FQr
(FQLservice well Qnly)
I~
4
5
6
7
8
9
o
11
12
13
14
15
16
17
PTD#: 2041110
Administration
Date
Appr
SFD
6/22/2004
-
Multi-lateral ot exLstil'\9_wel
-
C-O_8,
t02(b)(3}
well 1 C,,013.
I~I wellÞoœ J C:08.
I ~ductiol1 ca_siJlg suc_ces_stuU)' cemented Ln original wellbore_1C:O_8,
we I
47.
CQndlJctQr il1staJled_
~Il ""''''':''or''':, o,'Yl!!'. rY'IInL~
SUI IlJedJn Qriginal
!?rp
Slo
in orjginal
......,_v,,"-,.. ",~_..)._"..,~d <10 CfB.
installed in_ oJginvJ
~sing
liner _completion planned.
wells.
I
Allwa_steJo Class_
No reSerye pit planned
notbe_abandOl1e~, _
sidet(açks_are within_KupÇ\r\Jk ~o_nes.
rig is equjpped with_ sJeel pits,
Original wellbQre çQmpletioo wiJ
.CQU
MQtheJbore QnJy_ weJI proxirn_ate,
/IIQ çlos_e_approac_h js_s\Jes,
E'1Ç\11 to _use dynÇ\miç overbaJa_nçe with_8_.9 ppgJllJidaod 400_psLaJ surface.
EMW.
61:1E' expected at 1 OJ
.
Jest planned.
4500 psi BOP
MASE' çircIJlating290Q psj
MAS!? çalçuJatedat2754 psi
Reservoir
Mud sholJld preçlude 1:12S Qnrig, Rig_e_quippe_dwith sen_sors aod alÇ\rms.
65 ppm 1:12S_ prQd_uçed_ on lC_p_ad.
NA
NA
NA
No_
No
Yes
Yes
NA
Yes
NA
Yes
Yes
Yes
Yes
Yes
Yes
NA
Pre-produced
ACMP_ findjng _of
Permit
Permit
Can permi
_Well '^M',
AJI w it.hinJl4rDile_area_oJ review
i[1jßçtor~ .... ·..........:""..11 ,..& n"o,
Con_si ~_njsslJed_ forJhis Project.
- -
.C9ndu_ctor
.Surfacecasing_prQtects all_known USDWs
CMT v91 adeqL!ate_ to çirc_ulate_ on _cond_uçtoc & SUJtcsg
_CMT v_oj adeqL!ate_ to tie-inJQng _string tOSlJrJ çsg_
_CMTwill coyera]l koown_pro_dlJctiye bQri;zon_s
C,T, B&_permafr_ost
Jf.aJe-drilL has a_ 10:403 fQr abandol1ment been approved
Adequate well bore sep¡¡ratjo_n _Pfopo!;ed
Itdiverter Jeq_uired, dQes jt meet reguJations
Drilliog fluid prQgram schematic_&. e<¡uip Jist
80PEs,_dQ
adequate
Jhey meet reguJation
in .comments)
.test
C_hokemanifold çQmpJies_ w/API RP-53.lMay 84}
WOJk will OCcU( without
to _(pu_t psig
ratiog approp(Ìate;
.BOPE_press
_operation _shutdown_
Js_ pres_ence of H2S gas probable
string_prQvided
C_asing de.signs Ç\d_eQua_te fQr
Adequatetankageor re_serye pit
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Engineering
Appr Date
TEM 7/20/2004
iL\?M
(TY "'(j)
wells wLthin ¡\OR verified CFprs_ervice well only.}
Mej;banical_condJtion of
KRU 1 c-oa meÇ\sure.d65 ppm H2Soo 8/23/200_3,
Reservoir press_ureßst 10.
No_
Yes
_NA
NA
_NA
C.an be issued wEQ hydrogen s_ulfide meaSUres
Permit
.D_ata_presented Qn pote_ntial oveJPresslJre _zOl1es
35
36
Date 37
6/22/2004 38
39
Geology
Appr
SFD
tubing and 8.9 ppg mlJd.
Þe drilled dynamically_oyerbalanced with_cQile_d
ppg; wiJ
_SeismicanÇ\lysjs_ Qf sbaJlow gasz~))es
(it oft-!;hQre)
_Se¡¡bedcondjtioo survey
Contact
the second well bore open to the
so spacing exception will be in the
Multi-lateral producer in the Kuparuk "C1" sand. Spacing exception required as this will be
pool in SW X of Section 2, T11N, R10E, UM. CO 4328 has no administrative relief rule,
forma of a Conservation Order. Notice published June 21, 2004.
Date
weekly progre!;ueports [e¡<:ploratory _only]
Public
Commissioner
Date
Engineering
Commissioner
narnelp/1one. for
t
(
Date:
7 ) 2..Q
Geologic
Commissioner
j)rS
e
e
Well Histol)' File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
**** REEL HEADER ****
LDWG
06/12/07
AWS
01
**** TAPE HEADER ****
LDWG
04/08/02
01
*** LIS COMMENT RECORD ***
r,'""':
¡dì
RECE\VED
DEC 2 8 2006
commission
Alaska on & GaS cons.
AnChOfðge
!!!!!!!!!!!! !!!!!!! LDWG File Version 1.000
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!! Extract File: LISTAPE.HED
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
2
E. AQUIRRE
C. SEVCIK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
lC-08LIPBl
500292058570
ConocoPhillips Alaska, Inc.
BAKER HUGHES INTEQ
18-AUG-06
MWD RUN 3
3
D. BARBA
G. GOODRICH
MWD RUN 4
4
E. AQUIRRE
C. SEVCIK
12
llN
10E
94.00
00.00
00.00
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING
BIT SIZE (IN) SIZE (IN)
10.750
7.000
4.500
DRILLERS
DEPTH (FT)
2714.0
9767.0
8820.0
10174.0
3.750
#
¿oil- III ~ lL.t3DL(
REMARKS:
noted.
.
.
PER CONOCOPHILLIPS ALASKA STANDING ORDER, THE
GAMMA RAY CURVE FROM THIS LOG IS THE DEPTH REFERENCE
FOR THIS WELL. AS SUCH, NO DEPTH SHIFTS HAVE BEEN
APPLIED.
INDIVIDUAL MWD RUN DATA WAS MERGED IN THE FIELD PRIOR
TO DELIVERY FROM THE WELL SITE.
SURFACE LOCATION:
LAT: N 70 DEG 19' 32.920"
LONG: W149 DEG 29' 59.608"
LOG MEASURED FROM K.B. AT 52.0 FT. ABOVE PERM. DATUM
(M.S.L.) .
COMMENTS:
(1) All depths are Measured Depths (MD) unless otherwise
(2)
(3)
(4 )
All depths are Bit Depths unless otherwise noted.
All Gamma Ray data are real time data.
Baker Hughes INTEQ utilized Coiltrak downhole tools
and the Advantage
surface system
(5)
Locator, a Electrical
Disconnect and
and outer
to log this well.
Tools ran in the string included Casing Collar
slip) ,
downhole pressure, downhole weight on bit, and vibration stick-
Circulating Sub, a Drilling Performance Sub (inner
a Gamma and Directional Sub, and Hydraulic Orienting Sub with a
near bit
inclination sensor.
(6) Data presented here is final and was depth adjusted
to a PDC (Primary
Depth Control) log. The INTEQ Gamma Ray is the PDC for well 1C-
08LlPB1.
through a milled
Top of
Bottom
ft. to 6447.4 ft.
ft. MD (6285 ft.
Tape Subfile: 1
(7) The
window in 7"
window
of window
(8) The
SSTVD)
was not logged due to bit to sensor offset.
(9) The 1C-08L1PB1 wellbore was tied to 1C-08 at 8856
SSTVD) .
$
1C-08LlPB1
liner.
8923.6 ft. MD (6343.3 ft.
8938.0 ft. MD (6348.0 ft.
interval from 10143 ft. to
wellbore was drilled from 1C-08
SSTVD)
SSTVD)
10175 ft. MD (6444.7
73 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
LDWG .001
**** FILE HEADER ****
1024
*** LIS COMMENT RECORD
! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
***
LDWG File Version 1.000
Extract File: FILE001.HED
1
clipped curves; all bit runs merged.
.
.
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
MWD
$
.5000
START DEPTH
8938.0
STOP DEPTH
10175.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
2
3
4
MERGE TOP
8938.0
9061.0
9988.0
MERGE BASE
9061.0
9988.0
10175.0
#
REMARKS:
MERGED PASS.
NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C~08L1PB1 5.xtf
150
ConocoPhillips Alaska, Inc.
1C-08L1PB1
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
.
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 GAP I 4 4
2 RPD MWD 68 1 OHMM 4 4
3 RPS MWD 68 1 OHMM 4 4
4 RAD MWD 68 1 OHMM 4 4
5 RAS MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 69
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
10174.500000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 III records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .002
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!! !!!!!!! Remark File Version 1.000
!! !!!!!!!!!!!!!!!!! Extract File: FILE011.HED
3.125FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
2
.
log header data for each bit run in separate files.
2
.2500
START DEPTH
8938.0
STOP DEPTH
9061.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
01-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9090.0
8921. 0
9061. 0
o
.
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
45.2
88.7
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
127.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 2 (MWD Run 2) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
$
REMARKS:
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08LIPBl.xtf
150
ConocoPhillips Alaska, I
1C-08LlPBl
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
GRAX
GRAX
0.0
. .
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 14
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
9061.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 3 96 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .003
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
Remark File Version 1.000
Extract File: FILE012.HED
.
3.125FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
3
.
log header data for each bit run in separate files.
3
.2500
START DEPTH
9061. 0
STOP DEPTH
9988.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10020.0
9061.0
9988.0
o
84.0
90.0
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
123.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 3 (MWD Run 3) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
REMARKS:
.
.
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1PB1.xtf
150
ConocoPhillips Alaska, I
lC-08LlPB1
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 104
Tape File Start Depth 9061.000000
Tape File End Depth 9988.000000
Tape File Level Spacing 0.250000
Tape File Depth Units feet
.
**** FILE TRAILER ****
Tape Subfile: 4 186 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .004
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! !
3.125FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
Remark File Version 1.000
Extract File: FILE013.HED
4
.
log header data for each bit run in separate files.
4
.2500
START DEPTH
9986.0
STOP DEPTH
10175.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10175.0
9986.0
10175.0
o
83.3
85.2
TOOL NUMBER
10080984
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.
.
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
.000
.000
125.0
.0
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
o
#
REMARKS:
BIT RUN 4 (MWD Run 4).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08L1PB1.xtf
150
ConocoPhillips Alaska, I
lC-08L1PBl
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
.
.
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 21
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9988.000000
10174.500000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 5 103 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** TAPE TRAILER ****
LDWG
04/08/02
01
**** REEL TRAILER ****
LDWG
06/12/07
AWS
01
Tape Subfile: 6
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
.
**** REEL HEADER
LDWG
06/12/08
****
AWS
01
**** TAPE HEADER ****
LDWG
04/08/06
01
*** LIS COMMENT RECORD ***
.
R
RECE\VE,O
DEC 28 7P's
AlaSka Oil & GaS ConS Cn;),) i i)$~j
~
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: LISTAPE.HED
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
2
E. AQUIRRE
C. SEVCIK
MWD RUN 7
7
D. BARBA
C. SEVCIK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
,Dc/I-I( ,
ti ILl3û;)
OPEN HOLE
BIT SIZE (IN)
1C-08L1
500292058560
ConocoPhillips Alaska, Inc.
BAKER HUGHES INTEQ
08-DEC-06
MWD RUN 3
3
D. BARBA
G. GOODRICH
MWD RUN 8
8
E. AQUIRRE
M. FEKETI
MWD RUN 6
6
E. AQUIRRE
C. SEVCIK
12
llN
10E
94.00
00.00
00.00
CASING
SIZE (IN)
10.750
7.000
DRILLERS
DEPTH (FT)
2714.0
9767.0
.
.
3RD STRING
PRODUCTION STRING
4.500
8820.0
10954.0
3.750
#
REMARKS:
PER CONOCOPHILLIPS ALASKA STANDING ORDER, THE
GAMMA RAY CURVE FROM THIS LOG IS THE DEPTH REFERENCE
FOR THIS WELL. AS SUCH, NO DEPTH SHIFTS HAVE BEEN
APPLIED.
INDIVIDUAL MWD RUN DATA WAS MERGED IN THE FIELD PRIOR
TO DELIVERY FROM THE WELL SITE.
SURFACE LOCATION:
LAT: N 70 DEG 19' 32.920"
LONG: W149 DEG 29' 59.608"
LOG MEASURED FROM K.B. AT 94.0 FT. ABOVE PERM. DATUM
(M.S.L.) .
COMMENTS:
(1) All depths are Measured Depths (MD) unless otherwise
noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data are real time data.
(4) Baker Hughes INTEQ utilized Coiltrak downhole tools
and the
Advantage surface system to log this well.
(5) Tools ran in the string included casing Collar
Locator,
a Electrical Disconnect and Circulating Sub, a
Drilling
Performance Sub (inner and outer downhole pressure,
downhole
weight on bit, and vibration stick-slip), a Gamma
and
Directional Sub, and Hydraulic Orienting Sub with a
near bit
inclination sensor.
(6) Data presented here is final and was depth adjusted
to a PDC
(Primary Depth Control) log. The INTEQ Gamma Ray is
the PDC
for well 1C-08L1.
(7) The 1C-08L1 wellbore was drilled from lC-08 through
a milled window
in 7" liner.
Top of window
8923.6 ft. MD (6343.3 ft.
SSTVD)
Bottom of window
8938.0 ft. MD (6348.0 ft.
SSTVD)
(8) The interval from 10922 ft. to 10954 ft. MD
(6460 ft. to 6461 ft. SSTVD) was not logged due to
bit
to sensor offset.
(9) The 1C-08Ll wellbore was tied to 1C-08 at 8856 ft.
MD (6285 ft. SSTVD).
(10) The 1C-08L1 wellbore was sidetracked at 9528 ft. MD
(6407 ft. SSTVD)
from 1C-08LIPB1.
(11) USR data from 8940 ft. to 9528 ft. MD
(6349 ft. to 6407 ft. SSTVD)is MAD PASS data.
$
Tape Subfile: 1
84 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
LDWG .001
.
.
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: FILE001.HED
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
MWD
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
8938.0
STOP DEPTH
10954.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
BIT RUN NO
2
3
6
7
8
MERGE TOP
8938.0
9061.0
9493.0
9559.0
10420.0
MERGE BASE
9061. 0
9493.0
9559.0
10420.0
10954.0
#
REMARKS:
MERGED PASS.
NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08Ll 5.xtf
150
ConocoPhillips Alaska, Inc.
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAX 0.0
RPD RPD RPCL 0.0
RPS RPS RPCH 0.0
RAD RAD RACL 0.0
RAS RAS RACH 0.0
ROP ROP ROPA 0.0
.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 GAP I 4 4
2 RPD MWD 68 1 OHMM 4 4
3 RPS MWD 68 1 OHMM 4 4
4 RAD MWD 68 1 OHMM 4 4
5 RAS MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 112
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
10952.000000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 156 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .002
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
LDWG File Version 1.000
Extract File: FILE011.HED
2
.
log header data for each bit run in separate files.
2
.
DEPTH INCREMENT: .2500
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MWD 8938.0
$
STOP DEPTH
9061.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):'
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
01-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9090.0
8921. 0
9061.0
o
45.2
88.7
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
127.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 2 (MWD Run 2) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
REMARKS:
#
.
.
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08Ll.xtf
150
ConocoPhillips Alaska, I
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 14
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
9061.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 3 96 records...
Minimum record length:
8 bytes
.
Maximum record length:
4124 bytes
**** FILE HEADER ****
LDWG .003
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: FILEOI2.HED
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
3
.
log header data for each bit run in separate files.
3
.2500
START DEPTH
9061.0
STOP DEPTH
9493.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9525.0
9061. 0
9493.0
o
84.0
90.0
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
123.0
.0
.0
.0
.
.
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
o
#
REMARKS:
BIT RUN 3 (MWD Run 3) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1.xtf
150
ConocoPhillips Alaska, I
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
Size Length
.
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records:
49
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9061.000000
9493.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 4 131 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .004
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: FILEOI3.HED
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
4
.
log header data for each bit run in separate files.
6
.2500
START DEPTH
9493.0
STOP DEPTH
9559.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
04-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9591.0
9493.0
9559.0
o
90.0
90.0
TOOL NUMBER
.
MPR
GRAM
DIR
$
MULT. PROP. RESIST.
GAMMA RAY
DIRECTIONAL
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
10080984
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
119.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 6 (MWD Run 6).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
REMARKS:
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08Ll.xtf
150
ConocoPhillips Alaska, I
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
.
.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 8
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9493.000000
9559.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 5 90 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .005
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
LDWG File Version 1.000
Extract File: FILE014.HED
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
5
log header data for each bit run in separate files.
7
.2500
.
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MWD 9559.0
$
STOP DEPTH
10420.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
05-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10452.0
9559.0
10420.0
o
80.4
94.2
TOOL NUMBER
10080984
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4000
.0
.000
.000
.000
.000
127.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 7 (MWD Run 7) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
REMARKS:
#
*** INFORMATION TABLE: CONS
.
.
MNEM
VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08Ll.xtf
150
ConocoPhillips Alaska, I
1C-08Ll
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 96
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9559.000000
10420.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 6 178 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
.
**** FILE HEADER ****
LDWG .006
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: FILE015.HED
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
6
.
log header data for each bit run in separate files.
8
.2500
START DEPTH
10420.0
STOP DEPTH
10954.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
06-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10954.0
10420.0
10954.0
o
81. 0
88.0
TOOL NUMBER
10080984
10105429
10079128
3.750
8938.0
SFFP
9.00
.0
.0
4000
.0
.000
.000
.000
.000
133.0
.0
.0
.0
.
.
~
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
o
#
REMARKS:
BIT RUN 8 (MWD Run 8).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08L1.xtf
150
ConocoPhillips Alaska, I
1C-08Ll
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
.
.
.
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 60
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
10420.000000
10952.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 7 142 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** TAPE TRAILER ****
LDWG
04/08/06
01
**** REEL TRAILER ****
LDWG
06/12/08
AWS
01
Tape Subfile: 8
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
DOLI-II (
.
**** REEL HEADER ****
LDWG
06/11/03
AWS
01
**** TAPE HEADER ****
LDWG
04/08/02
01
*** LIS COMMENT RECORD ***
.
!! !!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!! !!!!!!! Extract File: LISTAPE.HED
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS.
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
2
E. AQUIRRE
C. SEVCIK
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
IÍ 1'-/ÐD1
1C-08L1PB1
500292058570
ConocoPhillips Alaska, Inc.
BAKER HUGHES INTEQ
18-AUG-06
MWD RUN 3
3
D. BARBA
G. GOODRICH
MWD RUN 4
4
E. AQUIRRE
C. SEVCIK
12
11N
10E
52.00
00.00
00.00
OPEN HOLE CASING
BIT SIZE (IN) SIZE (IN)
10.750
7.000
4.500
3.750
DRILLERS
DEPTH (FT)
2714.0
9767.0
8820.0
10174.0
REMARKS:
noted.
.
.
PER CONOCOPHILLIPS ALASKA STANDING ORDER, THE
GAMMA RAY CURVE FROM THIS LOG IS THE DEPTH REFERENCE
FOR THIS WELL. AS SUCH, NO DEPTH SHIFTS HAVE BEEN
APPLIED.
INDIVIDUAL MWD RUN DATA WAS MERGED IN THE FIELD PRIOR
TO DELIVERY FROM THE WELL SITE.
SURFACE LOCATION:
LAT: N 70 DEG 19' 32.920"
LONG: W149 DEG 29' 59.608"
LOG MEASURED FROM K.B. AT 52.0 FT. ABOVE PERM. DATUM
(M.S.L.) .
COMMENTS:
(1) All depths are Measured Depths (MD) unless otherwise
(2)
(3)
(4)
All depths are Bit Depths unless otherwise noted.
All Gamma Ray data are real time data.
Baker Hughes INTEQ utilized Coiltrak downhole tools
and the Advantage
surface system
(5)
Locator, a Electrical
Disconnect and
and outer
to log this well.
Tools ran in the string included Casing Collar
downhole pressure, downhole weight on bit, and vibration stick-
Circulating Sub, a Drilling Performance Sub (inner
slip) ,
a Gamma and Directional Sub, and Hydraulic Orienting Sub with a
near bit
inclination sensor.
(6) Data presented here is final and was depth adjusted
to a PDC (Primary
Depth Control) log. The INTEQ Gamma Ray is the PDC for' well 1C-
08LlPB1.
milled window in
Top of
Bottom
ft. to 6447.4 ft.
Tape Subfile: 1
(7) The sidetrack was drilled from 1C-08 through a
7" liner.
window
of window
(8) The
SSTVD)
was not logged due to bit to sensor offset.
(9) Tied to lC-08 at 8856 ft. MD (6285 ft. SSTVD).
$
8923.6 ft. MD (6343.3 ft. SSTVD)
8938.0 ft. MD (6348.0 ft. SSTVD)
interval from 10143 ft. to 10175 ft. MD (6444.7
73 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
LDWG .001
**** FILE HEADER ****
1024
*** LIS COMMENT RECORD
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
***
LDWG File Version 1.000
Extract File: FILE001.HED
1
and clipped curves; all bit runs merged.
.5000
.
.
#
FILE SUMMARY
PBU TOOL CODE
MWD
$
START DEPTH
8938.0
STOP DEPTH
10175.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
2
3
4
MERGE TOP
8938.0
9061.0
9988.0
MERGE BASE
9061.0
9988.0
10175.0
#
REMARKS:
MERGED PASS.
NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08L1PB1 5.xtf
150
ConocoPhillips Alaska, Inc.
lC-08L1PB1
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAX 0.0
RPD RPD RPCLX 0.0
RPS RPS RPCHX 0.0
RAD RAD RACLX 0.0
RAS RAS RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: ¡F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
.
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 GAP I 4 4
2 RPD MWD 68 1 OHMM 4 4
3 RPS MWD 68 1 OHMM 4 4
4 RAD MWD 68 1 OHMM 4 4
5 RAS MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 69
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
10174.500000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 111 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .002
1024
*** LIS COMMENT RECORD ***
! !!!!!!!!!!!!!!!!!! Remark File Version 1.000
! !!! !!!!!!!!!!!!!!! Extract File: FILE011.HED
3.125FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
2
.
log header data for each bit run in separate files.
2
.2500
START DEPTH
8938.0
STOP DEPTH
9061.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
01-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9090.0
8921. 0
9061. 0
o
.
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
45.2
88.7
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
127.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 2 (MWD Run 2) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
$
REMARKS:
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1PB1.xtf
150
ConocoPhillips Alaska, I
1C-08L1PB1
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
RPCL
GRAX
RPCLX
0.0
0.0
GRAX
RPCL
.
.
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: ¡F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 14
Tape File Start Depth
Tape File End Depth
Tape File Level spacing
Tape File Depth Units
8938.000000
9061.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 3 96 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .003
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
3.125FILE HEADER
Remark File Version 1.000
Extract File: FILE012.HED
.
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
3
.
log header data for each bit run in separate files.
3
.2500
START DEPTH
9061. 0
STOP DEPTH
9988.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10020.0
9061.0
9988.0
o
84.0
90.0
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
123.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 3 (MWD Run 3) .
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
$
REMARKS:
.
.
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1PB1.xtf
150
ConocoPhi1lips Alaska, I
1C-08LlPBl
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: ¡F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 104
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9061.000000
9988.000000
0.250000
feet
**** FILE TRAILER ****
.
Tape Subfile: 4
186 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** FILE HEADER ****
LDWG .004
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! Extract File: FILE013.HED
3.125FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
4
.
log header data for each bit run in separate files.
4
.2500
START DEPTH
9986.0
STOP DEPTH
10175.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10175.0
9986.0
10175.0
o
83.3
85.2
TOOL NUMBER
10080984
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
125.0
.
.
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
.000
.0
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
o
#
REMARKS:
BIT RUN 4 (MWD Run 4).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08LlPB1.xtf
150
ConocoPhillips Alaska, I
lC-08LlPB1
Kuparuk River Unit
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: ¡F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
.
.
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAP I 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 21
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9988.000000
10174.500000
0.250000
feet
**** FILE TRAILER ****
Tape Subfi1e: 5 103 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** TAPE TRAILER ****
LDWG
04/08/02
01
**** REEL TRAILER ****
LDWG
06/11/03
AWS
01
Tape Subfile: 6
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
.
**** REEL HEADER ****
LDWG
06/08/16
AWS
01
**** TAPE HEADER ****
LDWG
04/08/06
01
*** LIS COMMENT RECORD ***
.
!!!!!!!!!!!!!!!! !i! LDWG File Version 1.000
!! !!!!!!!!!! !!!!!!! Extract File: LISTAPE.HED
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
MWD RUN 2
2
E. AQUIRRE
C. SEVCIK
MWD RUN 7
7
D. BARBA
C. SEVCIK
OPEN HOLE
BIT SIZE (IN)
3.750
1C-08L1
500292058560
ConocoPhillips Alaska, Inc.
BAKER HUGHES INTEQ
07-APR-06
MWD RUN 3
3
D. BARBA
G. GOODRICH
MWD RUN 8
8
E. AQUIRRE
M. FEKETI
MWD RUN 6
6
E. AQUIRRE
C. SEVCIK
12
UN
10E
52.00
00.00
00.00
CASING
SIZE (IN)
10.750
7.000
4.500
DRILLERS
DEPTH (FT)
2714.0
9767.0
8820.0
10954.0
PER CONOCOPHILLIPS ALASKA STANDING ORDER, THE
GAMMA RAY CURVE FROM THIS LOG IS THE DEPTH REFERENCE
FOR THIS WELL. AS SUCH, NO DEPTH SHIFTS HAVE BEEN
APPLIED.
{JOt.! -11f
it /,/O¥D
.
.
INDIVIDUAL MWD RUN DATA WAS MERGED IN THE FIELD PRIOR
TO DELIVERY FROM THE WELL SITE.
SURFACE LOCATION:
LAT: N 70 DEG 19' 32.920"
LONG: W149 DEG 29' 59.608"
LOG MEASURED FROM K.B. AT 52.0 FT. ABOVE PERM. DATUM
(M.S.L.) .
COMMENTS:
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data are realtime data.
(4) Baker Hughes INTEQ utilized Coiltrak downhole tools and the
Advantage surface system to log this well.
(5) Tools ran in the string included Casing Collar Locator,
a Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (inner and outer downhole pressure, downhole
weight on bit, and vibration stick-slip), a Gamma and
Directional Sub, and Hydraulic Orienting Sub with a near bit
inclination sensor.
(6) Data presented here is final and was depth adjusted to a PDC
(Primary Depth Control) log. The INTEQ Gamma Ray is the PDC
for well lC-08Ll.
(7) The sidetrack was drilled from lC-08 through a milled window
in 7" liner.
Top of window 8923.6 ft. MD (6343.3 ft. SSTVD)
Bottom of window 8938.0 ft. MD (6348.0 ft. SSTVD)
(8) The interval from 10922 ft. to 10954 ft. MD
(6460 ft. to 6461 ft. SSTVD)was not logged due to bit
to sensor offset.
(9) Tied to lC-08 at 8856 ft. MD (6285 ft. SSTVD).
(10) Sidetracked at 9528 ft. MD (6407 ft. SSTVD) from lC-08LlPB1.
(11) USR data from 8940 ft. to 9528 ft. MD
(6349 ft. to 6407 ft. SSTVD)is MAD PASS data.
$
Tape Subfile: 1
84 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
LDWG .001
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
FILE HEADER
LDWG File Version 1.000
Extract File: FILE001.HED
FILE NUMBER:
1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT:
.5000
#
FILE SUMMARY
PBU TOOL CODE
START DEPTH
STOP DEPTH
MWD
8938.0
10954.0
,
.
.
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
BIT RUN NO MERGE TOP MERGE BASE
2 8938.0 9061.0
3 9061.0 9493.0
6 9493.0 9559.0
7 9559.0 10420.0
8 10420.0 10954.0
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
MERGED PASS.
NO DEPTH SHIFTS WERE APPLIED AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WOFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1 5.xtf
150
ConocoPhillips Alaska, Inc.
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
OOEP
----------------------------------------------------
GR GR GRAX 0.0
RPD RPD RPCL 0.0
RPS RPS RPCH 0.0
RAO RAD RACL 0.0
RAS RAS RACH 0.0
ROP ROP ROPA 0.0
* FORMAT RECORD ( TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
· .
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 GAPI 4 4
2 RPD MWD 68 1 OHMM 4 4
3 RPS MWD 68 1 OHMM 4 4
4 RAD MWD 68 1 OHMM 4 4
5 RAS MWD 68 1 OHMM 4 4
6 ROP MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 112
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8938.000000
10952.000000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 156 records...
Minimum record length:
Maximum record length:
50 bytes
4124 bytes
**** FILE HEADER ****
LDWG .002
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!! !!!!!!!!!!!!!!! Extract File: FILEOll.HED
FILE HEADER
FILE NUMBER:
2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO:
2
DEPTH INCREMENT:
.2500
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
MWD 8921.0
9061.0
.
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
MPR MULT. PROP. RESIST.
GRAM GAMMA RAY
DIR DIRECTIONAL
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.
01-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9090.0
8921.0
9061.0
o
45.2
88.7
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000 127.0
.000 .0
.000 .0
.000 .0
.
.
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
.00
HOLE CORRECTION (IN):
.000
#
TOOL STANDOFF (IN):
.0
EWR FREQUENCY (HZ):
o
#
REMARKS:
BIT RUN 2 (MWD Run 2).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPA - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
lC-08Ll.xtf
150
ConocoPhillips Alaska, I
lC-08Ll
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
.
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 GAPI
2 RPCL MWD 68 1 OHMM
3 RPCH MWD 68 1 OHMM
4 RACL MWD 68 1 OHMM
5 RACH MWD 68 1 OHMM
6 ROPA MWD 68 1 FPHR
Total Data Records: 16
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
8921.000000
9061.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 3 100 records...
Minimum record length:
Maximum record length:
50 bytes
4124 bytes
**** FILE HEADER ****
LDWG .003
1024
*** LIS COMMENT RECORD ***
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
-------
!!!!!! !!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: FILE012.HED
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and
BIT RUN NO:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
MWD
$
3
.
24
log header data for each bit run in separate files.
3
.2500
START DEPTH
9061.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
STOP DEPTH
9493.0
02-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9525.0
9061.0
9493.0
o
.
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
MPR
GRAM
DIR
$
BOTTOM)
TOOL TYPE
MULT. PROP.
GAMMA RAY
DIRECTIONAL
RESIST.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
.
84.0
90.0
TOOL NUMBER
10000103
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4800
.0
.000
.000
.000
.000
123.0
.0
.0
.0
.00
.000
.0
o
BIT RUN 3 (MWD Run 3).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
REMARKS:
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN lC-08Ll.xtf
LCC 150
CN ConocoPhillips Alaska, I
WN lC-08Ll
FN Kuparuk River
COUN North Slope
STAT Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
.
.
Data record type is: 0
Datum "rame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: "eet
"rame spacing: 0.250000
"rame spacing units: [" ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
1
"RAME SPACE =
0.250 * "
ONE DEPTH PER "RAME
Tape depth ID: "
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAPI 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 HHR 4 4
-------
24
Total Data Records: 49
Tape "ile Start Depth
Tape "ile End Depth
Tape "ile Level Spacing
Tape "ile Depth Units
9061.000000
9493.000000
0.250000
feet
**** "ILE TRAILER ****
Tape Subfile: 4 131 records...
Minimum record length:
Maximum record length:
8 bytes
4124 bytes
**** "ILE HEADER ****
LDWG .004
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
nLE HEADER
LDWG "ile Version 1.000
Extract "ile: "ILE013.HED
nLE NUMBER:
4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO:
6
DEPTH INCREMENT:
.2500
#
nLE SUMMARY
.
VENDOR TOOL CODE START DEPTH
STOP DEPTH
MWD 9493.0
9559.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOE'TWARE
SURE'ACE SOE'TWARE VERSION:
DOWNHOLE SOE'TWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (E'T):
TOP LOG INTERVAL (E'T):
BOTTOM LOG INTERVAL (E'T):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
MPR MULT. PROP. RESIST.
GRAM GAMMA RAY
DIR DIRECTIONAL
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (E'T):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
E'LUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGE')
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
.
04-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
9591.0
9493.0
9559.0
o
90.0
90.0
TOOL NUMBER
10080984
10105429
10099075
3.750
8938.0
SE'E'P
9.00
.0
.0
4800
.0
.000
119.0
.000
.0
.
.
MUD FILTRATE AT MT:
.000
.0
MUD CAKE AT MT:
.000
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
.00
HOLE CORRECTION (IN):
.000
#
TOOL STANDOFF (IN):
.0
EWR FREQUENCY (HZ):
o
#
REMARKS:
BIT RUN 6 (MWD Run 6).
GR/MPR.
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN lC-08Ll.xtf
LCC 150
CN ConocoPhillips Alaska, I
WN lC-08Ll
FN Kuparuk River
COUN North Slope
STAT Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
.
.
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAPI 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 8
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9493.000000
9559.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 5 92 records...
Minimum record length:
Maximum record length:
50 bytes
4124 bytes
**** FILE HEADER ****
LDWG .005
1024
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
FILE HEADER
LDWG File Version 1.000
Extract File: FILEOI4.HED
FILE NUMBER:
5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO:
7
DEPTH INCREMENT:
.2500
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
.
MWD
9559.0
10420.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
MPR MULT. PROP. RESIST.
GRAM GAMMA RAY
DIR DIRECTIONAL
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
.
05-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10452.0
9559.0
10420.0
o
80.4
94.2
TOOL NUMBER
10080984
10105429
10099075
3.750
8938.0
SFFP
9.00
.0
.0
4000
.0
.000 127.0
.000 .0
.000 .0
.
.
MUD CAKE AT MT:
.000
. C
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
.00
HOLE CORRECTION (IN):
.000
#
TOOL STANDOFF (IN):
.0
EWR FREQUENCY (HZ):
o
#
REMARKS:
BIT RUN 7 (MWD Run 7).
GR/MPR .
CURVE GLOSSARY:
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN lC-08Ll.xtf
LCC 150
CN ConocoPhillips Alaska, I
WN lC-08Ll
FN Kuparuk River
COUN North Slope
STAT Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX GRAX GRAX 0.0
RPCL RPCL RPCL 0.0
RPCH RPCH RPCH 0.0
RACL RACL RACL 0.0
RACH RACH RACH 0.0
ROPA ROPA ROPA 0.0
k FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
.
.
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: I
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 GAPI 4 4
2 RPCL MWD 68 1 OHMM 4 4
3 RPCH MWD 68 1 OHMM 4 4
4 RACL MWD 68 1 OHMM 4 4
5 RACH MWD 68 1 OHMM 4 4
6 ROPA MWD 68 1 FPHR 4 4
-------
24
Total Data Records: 96
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9559.000000
10420.000000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 6 180 records...
Minimum record length:
Maximum record length:
50 bytes
4124 bytes
**** FILE HEADER ****
LDWG .006
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! LDWG File Version 1.000
!!!!!!!!!! !!!!!!!!! Extract File: FILE015.HED
FILE HEADER
FILE NUMBER:
6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO:
8
DEPTH INCREMENT:
.2500
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
STOP DEPTH
.
MWD
10420.0
10954.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
MPR MULT. PROP. RESIST.
GRAM GAMMA RAY
DIR DIRECTIONAL
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
fLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGf)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD fILTRATE AT MT:
.
06-AUG-04
ADVANTAGE
3.125 CTK
MEMORY
10954.0
10420.0
10954.0
o
81. 0
88.0
TOOL NUMBER
10080984
10105429
10079125
3.750
8938.0
SffP
9.00
.0
.0
4000
.0
.000 133.0
.000 .0
.000 .0
.
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
BIT RUN 8 (MWD Run 8).
GR/MPR .
CURVE GLOSSARY:
.
.000
. C
.00
.000
.0
o
GRAM - GAMMA RAY APPARENT (MWD-API)
RPCL - DEEP PHASE RESISTIVITY (OHMM)
RPCH - SHALLOW PHASE RESISTIVITY (OHMM)
ROPS - RATE OF PENETRATION (FPHR)
RACL - DEEP ATTENUATION RESISTIVITY (OHMM)
RACH - SHALLOW ATTENUATION RESISTIVITY (OHMM)
$
#
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
1C-08L1.xtf
150
ConocoPhillips Alaska, I
1C-08L1
Kuparuk River
North Slope
Alaska
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
----------------------------------------------------
ODEP
GRAX
RPCL
RPCH
RACL
RACH
ROPA
GRAX
RPCL
RPCH
RACL
RACH
ROPA
GRAX
RPCL
RPCH
RACL
RACH
ROPA
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
0.0
0.0
0.0
0.0
0.0
0.0
~
"
.
..
Optical Log Depth Scale Units: teet
trame spacing: 0.250000
trame spacing units: [t ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
tRAME SPACE =
0.250 * t
ONE DEPTH PER tRAME
Tape depth ID: t
6 Curves:
Name Tool Code Samples Units
.
Size Length
1
2
3
4
5
6
GRAX
RPCL
RPCH
RACL
RACH
ROPA
MWD
MWD
MWD
MWD
MWD
MWD
68
68
68
68
68
68
1
1
1
1
1
1
GAPI
OHMM
OHMM
OHMM
OHMM
tPHR
Total Data Records: 60
Tape tile Start Depth
Tape tile End Depth
Tape tile Level Spacing
Tape tile Depth Units
10420.000000
10952.000000
0.250000
feet
**** tILE TRAILER ****
Tape Subfile: 7 144 records...
Minimum record length:
Maximum record length:
50 bytes
4124 bytes
**** TAPE TRAILER ****
LDWG
04/08/06
01
**** REEL TRAILER ****
LDWG
06/08/16
AWS
01
Tape Subfile: 8
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
4
4
4
4
4
4
-------
4
4
4
4
4
4
24