Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-191
· .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may bescanned during a special rescan activity or are viewable
by direct inspection of the file.
~ Cd if - L 1-1- Well History File Identifier
Organizing (done)
D Two-sided 11111111I1111111111
D Rescan Needed III 11111111 II 11I11I
RESCAN
r/color Items:
o Greyscale Items:
DIGITAL DATA
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
D Diskettes, No.
D Other, Norrype:
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
D Logs of various kinds:
NOTES:
D Other::
BY: ~
Date: I 'J-I J ~ D0
151
mp
1111111111111111111
mE
{p~
Project Proofing
BY: ~
Date: I a J ~:J-Io~
~ x 30 = {Po +
151
Scanning Preparation
BY:
Date:
(p
= TOTAL PAGES
(Count does not include cover sheet)
151
ProducûonScanning
Stage 1 Page Count from Scanned File: ~ (Count doe. In:7' shee')
Page Count Matches Number in Scanning Preparation: YES
Date: I~{ va.jvb
1111111111111111111
NO
Stage 1
If NO in stage 1, page(s) discrepancies were found:
YES
151 ntp
NO
BY:
~
BY:
Maria
Date:
151
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
11111111I1111111111
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11/1111111111111111
10/6/2005 Well History File Cover Page.doc
• •
.~
.~ :;
~~ a
MICROFILMED
03/01 /2008
~~~,.
~~
_..
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFiche\CvrPgs_Inserts~Microfilm Marketdoc
J D.e <-
DATA SUBMITTAL COMPLIANCE REPORT
11/27/2006
5'ptl.L ;U~ Ò1' A ~~
API No. 50-029-23227-60-00
Permit to Drill 2041910
Well Name/No. MILNE PT UNIT SB H-16L 1
Operator BP EXPLORATION (ALASKA) INC
MD 9915
TVD 3964
Completion Date 11/1/2004
Completion Status 1-01L
Current Status 1-01L
UIC N
---
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
~-"---_._--_._-------
----~~~
DATA INFORMATION
Types Electric or Other Logs Run: MD, GR, RES, Photo GYRO, GYRO, ASI, IFR 1 CASANDRA
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint
Logl
Data
Type
I ED
. Rpt
!
I ED
I
I
Electr
Digital Dataset
Med/F~ ~b~Name
D Tap 12958 Induction/Resistivity
Log Log Run Interval OHI
Scale Media No Start Stop CH Received Comments
--~...._-~---- 1/17/2005 - GRlEWR4/Ä-SIIROP/PWD/1
6182 9915 Open
MWD i
6182 9915 Open 1/17/2005 GRfEWR4/ABIIROP/PWD/
MWD
112 9915 Open 2/22/2006 ROP DGR EWR plus
Graphics
Sample
Set
Sent Received Number Comments
12958 LIS Verification
C Lis
4521 Induction/Resistivity
Well Cores/Samples Information:
Name
Interval
Start Stop
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? ~
Daily History Received?
~N
~N
Formation Tops
Analysis
Received?
~
---"---------_.._~_.
--_...--"--_._---~
_._~~~
--------.--
Comments:
~
Date:
._-~~
_._-~~
~ ~ ro-~-~~
Compliance Reviewed By:
.
.
.
.
WELL LOG TRANSMITTAL
c9-04 - ICj I
To: State of Alaska
Alaska Oil and Gas Conservation Comrn.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 16, 2006
lô~1
RE: MWD Formation Evaluation Logs MPH-16 L1,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
MPH-16Ll:
LAS Data & Digital Log Images:
50-029-23227-60
1 CD Rom
Œ~QQltì
0/9-910&
.
.
d.of-/?r
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Cornm.
Attn.: Helen Warman
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 24, 2004
RE: MWD Formation Evaluation Logs MPH-16 L1,
AK-MW-3330703
1 LIS formatted Disc with verification listing.
API#: 50-029-23227-60
¥ )J,~ç2>
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO
THE ATTENTION OF:
Sperry-Sun
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:~
Sig
tU..v
STATE OF ALASKA
ALASKA. AND GAS CONSERVATION COeSSJONRI:CEEI' I~
REPORT OF SUNDRY WELL OPERATIONS MAn- vt:D
1 1 2005
1. Operations Performed:
o Abandon
o Alter Casing
o Change Approved Program
lion
o Plug Perforations
o Perforate New Pool
o Perforate
a -orage'
o Time Extension
a Repair Well
a Pull Tubing
o Operation Shutdown
o Stimulate
o Waiver
o Re-Enter Suspended Well
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
KBE = 70.5'
8. Property Designation:
ADL 025906
11. Present well condition summary
Total depth: measured
Effective depth:
true vertical
measured
true vertical
9915'
3964'
9915'
3964'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
112'
4147'
6150'
3728'
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
4. Current Well Class:
a Development 0 Exploratory
o Stratigraphic 0 Service
5. ermit To Drill Number:
204-191-00
6. API Number:
50-029-23227-60-00
99519-6612
9. Well Name and Number:
MPH-16L1
10. Field I Pool(s):
Milne Point Unit I Schrader Bluff
feet
feet Plugs (measured) None
feet Junk (measured) None
feet
Size MD TVD Burst Collapse
20" 112' 112' 1490 470
10-314" 4182' 3139' 5210 2480
7-5/8" 6182' 4008' 6890 4790
4-1/2" 6165' - 9893' 3963' 8430 7500
Slotted 6192' - 9848'
Slotted 4011' - 3959'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
2-7/8",6.5#
L-80
5920'
None
None
RBDMS 8Ft MAR J 4 2005
Treatment description including volumes used and final pressure:
13.
Oil-Bbl
Prior to well operation:
Subsequent to operation:
14. Attachments:
o Copies of Logs and Surveys run
a Daily Report of Well Operations
a Well Schematic Diagram
Re resentative Dai Avera e Production or In"ection Data
Gas-Mcf Water-Bbl Casin Pressure
Tubin Pressure
15. Well Class after proposed work:
o Exploratory a Development 0 Service
16. Well Status after proposed work:
a Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
est 0 my nowe ge. Sundry Number or N/A if C.O. Exempt:
17.
Printed Name Sondra Stewman
Title Technical Assistant
_~ Phone
/' Prepared By Name/Number:
Date 01-[ O"-oS Sondra Stewman, 564-4750
Submit Original Only
Tree'2"9/16" 75MFMC
Wellhead: 11".~. 7-1116" 5.
Gen5A, w 2-7/8" FMC Tbg. .,3"
LH Acme on top and 2-7/8" EU 8rd
on bottom, 2.5" CIW BPV Profile
20" x 34" insulated, 215 #!ft A-53 [JJ]J
10 3/4" 45.5 ppf L-80 BTRC
(Drift ID = 9.794, cap. = .0961 bpf)
10 3/4" HOWCO Float Shoe
14182' I
75/8" 29.7 ppf, L-80, BTRC-mod casing
(Drift ID = 6.750", cap = 0.0459 bpi)
2-7/8" 6.5 ppf, L-80 8rd eue tbg.
(drift id = 2.347" cap = .00592 bpi)
KOP @ 500'
+60 degree from 2850'
Max hole angle = 69 degree @ 5722'
Window in 7 5/8" Casing @ 6182' - 6194'
Well Angle @ window = 76°
Baker Hook Wall
Hanger inside 7-5/8" Window 16.70'
Baker Hook Wall
Hanger outside 7-5/8" Window 6.15'
Baker Tie Back Sleeve 6309'
Baker ZXP Liner Top Packer 6320'
Baker 7-5/8" x 5" HMC Liner Hanger 6326'
Baker 190-47 Seal Bore Extension 6334'
7-5/8" Weatherford Float Collar 6431'
7-5/8" Weatherford Float Shoe 6515'
DATE
10/31/04
02/15/05
REV. BY
MPH-16
OA Lateral
Orig. KB elev. = 70.50' (Doyon 14)
orieLDS. elev.= 30.03' (Doyon 14)
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
139'
Lee Hulme Drilled and complèted by Doyon 14
Lee Hulme Replace ESP Nabors 4ES
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
2104'
Centrilift Heat Trace
3465'
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
5684'
HES XN-Nipple (2.205" id)
5836'
Phoenix MS-1 Pressure Head 5859'
ESP Pump, 122 stg. GC2200
GPMTAR 1:1
5860'
Gas Separator
Model - GRSFTXAR H6
Tandem Seal Section,
Model - GSB3 DB UT/L TAB HSN
PFSAlPSA
Motor, 152 KMH
2325 volt I 40 amp
5881' I
5886' I
5900' I
Phoenix MS-1 w/6 fin Centralizer 5913' I
Phoenix Sensor Depth = 3933' TVD
3\~ «Ql<1¿-f?1(çl')~(ßCV331 -~ 4.t)
89 jts. - 41/2" 12.6# L-80, IBT
Slotted Liner (6204' 87ït9') & (Û84S' 3858')
61/8" Hole td @ 9915' HES 41/2" "V" Float Shoe 9905'
6 1/8" Hole td @ 9931' HES 41/2" "V" Float Shoe
9967 '
87 jts. - 41/2",12.6# L-80, 1ST
OB Lower Lateral Slotted Liner (6524' - 8839') & (9173' - 9922')
COMMENTS
MILNE POINT UNIT
WELL MPH-16
API NO: 50-029-23227-00-öt)
API NO: 50-029-23227-"ða-<ðJ''O
BP EXPLORATION (AK)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
WORKOVER
NABORS ALASKA DRILLING I
NABORS 4ES
Start: 2/13/2005
Rig Release: 2/16/2005
Rig Number:
Spud Date: 10/14/2004
End:
2/13/2005 00:00 - 03:00 3.00 RIGD P PRE PJSM. Scope down & lower derrick. Rig down rig components.
03:00 - 09:00 6.00 RIGD P PRE Wait on trucks. Replace main winch on rig floor.
09:00 - 13:30 4.50 MOB P PRE PJSM. Move rig from MP 1-19 pad to MP H-16.
13:30 - 16:00 2.50 RIGU P PRE PJSM. Rig up on MP H-16. Raise & scope up derrick. Rig
accepted @ 16:00 hrs, 02/13/2005.
16:00 - 18:30 2.50 KILL P DECOMP PJSM. Take on heated seawater. Rig up hardline to tiger tank.
Install secondary valve on I/A.
18:30 - 23:00 4.50 KILL P DECOMP PJSM. Pull BPV, OA = 150 psi, TBG=450 psi Pressure test
lines. Bleed Gas off IA and tubing. Circulate 35 bbls down
tubing. Bullhead 75 bbls down tubing. Circulate 400 bbls down
tubing up lA, clean returns. Shut-down and monitor 30 min,
both tbg and IA on vac
23:00 - 23:30 0.50 WHSUR P DEcOMP Install TWC, Bullhead 10 bbls down IA at 4 bpm and 80 psi.
23:30 - 00:00 0.50 WHSUR P DECOMP PJSM. Begin to nipple down tree, found 100 psi on IA. Bleed
to tank. All Gas.
2/14/2005 00:00 - 02:30 2.50 KILL P DEcOMP Continue to bleed to tank and monitor. All gas. Will bleed of to
o psi, builds up 50 psi in 30 minutes. Rig up E trunk and drain
hoses.
02:30 - 03:00 0.50 WHSUR P DEcOMP Rig up lubricator and pull TWc. 60 psi on tubing.
03:00 - 04:00 1.00 KILL P DEcOMP Rig up tree and to circ
04:00 - 04:45 0.75 KILL P DECOMP Circulate 100 bbls at 5 bpm. Hit fluid level in tubing at -28
bbls. Returns mostly gas and crude. After shutting down
tubing on vac and IA had 30 psi. IA bleeding down slowly
giving up gas, oil and seawater. IA did bleed to 0 psi after 10
mintutes.
04:45 - 05:30 0.75 KILL P DEcOMP Circulating seawater at 5 bpm, thick crude returns. Out of fluid.
05:30 - 07:30 2.00 KILL P DECOMP Wait on 125 degree seawater.
07:30 - 08:30 1.00 KILL P DECOMP PJSM. Pump (10) bbls down tubing @ 5 bpm, no indication of
returns, not even air. Bullhead 200 bbls down I/A @ 5 1/2 bpm,
150 psi.
08:30 - 09:30 1.00 WHSUR P DEcOMP Monitor well. Tubing & I/A on vacuum. Set two way check
valve.
09:30 - 11 :00 1.50 WHSUR P DECOMP PJSM. N/D tree.
11 :00 - 14:00 3.00 BOPSU P DEcOMP PJSM. N/U adapter flange & BOPE. Install secondary annulus
valve.
14:00 - 17:00 3.00 BOPSU DEcOMP PJSM. Conduct full BOPE test, 350 low pressure, 3500 psi
high pressure, 5 minutes charted on each test. Witnessing of
test waived by AOGCc rep John Crisp. Testing of BOP
components witnessed by Company Man. No failures.
17:00 - 18:30 1.50 BOPSU DECOMP PJSM. Pick up lubricator, pull two way check, lay down
lubricator.
18:30 - 19:00 0.50 PULL P DECOMP PJSM. MU landing joint, back out LDS, and pull hanger to
floor. Up wt = 42K.
19:00 - 00:00 5.00 PULL P DECOMP Pull tubing and ESP cable,double displacing every 5 stands.
2/15/2005 00:00 - 02:00 2.00 PULL P DECOMP Continue to pull tubing, ESP cable and ESP out of hole. Lay
down pump.
02:00 - 04:30 2.50 RUNCO RUNcMP Rig down sheave, rig up double sheave, change out ESP reel
in spooler, ready new pump. Shoot fluid level at 650'. Found
twisted off shaft in old ESP and shaft frozen inside gas
separator.
04:30 - 06:30 2.00 RUNCO RUNCMP MU flat guards.
06:30 - 09:00 2.50 RUNCO RUNCMP MU and service pump assembly with Phoenix sensor.
09:00 - 10:00 1.00 RUNCO RUNCMP Test MLE. Clear and clean rig floor.
Printed: 2/23/2005 11 :55:44 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
WORKOVER
NABORS ALASKA DRILLING I
NABORS 4ES
Start: 2/13/2005
Rig Release: 2/16/2005
Rig Number:
Spud Date: 10/14/2004
End:
12:30 - 18:00 5.50
18:00 - 19:00
19:00 - 00:00 5.00
2/16/2005 00:00 - 01 :30 1.50
01 :30 - 02:00 0.50
02:00 - 07:30 5.50
07:30 - 08:30 1.00
08:30 - 10:00
10:00 - 11 :30
11 :30 - 12:00 0.50 WHSUR P
RIH from derrick with 2.875" EUE to 2,627'.
RU to run heat trace. Pull cable through sheave, attach to
tubing and test.
RUNCMP Continue to RIH 2.875" EUE from derrick with EST and heat
trace.
RUNcMP PJSM with WSL's. Check cables and flush pump. Make up
additional flat guards.
RUNcMP Continue to RIH 2.875" EUE from derrick with ESP and heat
trace.
RUNcMP Continue to RIH 2.875" EUE from derrick with ESP and heat
trace.
RUNCMP PU and MU tubing hanger.
RUNcMP Install penetrators and make up/splice ESP and heat trace
connectors.
RUNCMP Land hanger. RILDS. Set TWC and test same. Drain and
blow down lines.
WHDTRE ND BOPE. Test spool and DSA.
WHDTRE Nipple up adapter flange and tree. Test both to 5,000 psi.
Good test.
WHDTRE Pull TWc, Set BPV. Secure tree and cellar.
Rig Released from well work at 12:00 hours.
Printed: 2/23/2005 11 :55:44 AM
oJ
~ STATE OF AlASKA. RECEIVED
wEtC~~MPL~T~~~ g~~~g~~~~~~;g~~~~ORT AS~~~OG DEC 2 1 2004
RevNmtÞ .pjJ1\,Q.t~kß.yIþ,lóWllmìMion
.
1a. Well Status: IS! Oil DGas D Plugged D Abandoned D Suspended DWAG 1b. Well Class: v
20MC 25.105 20MC25.110 IS! Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 11/1/2004 204-191
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 10/26/2004 50- 029-23227-60-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 10/29/2004 MPH-16L 1
2969' NSL, 4003' WEL, SEC. 34, T13N, R10E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
3770' NSL, 1951' WEL, SEC. 33, T13N, R10E, UM (OA) KBE = 70.5' Milne Point Unit I Schrader Bluff
Total Depth: 9. Plug Back Depth (MD+ TVD)
699' NSL, 3903' WEL, SEC. 33, T13N, R10E, UM (OA) 9915' + 3964' Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 556641 y- 6010120 Zone- ASP4 9915' + 3964' Ft ADL 025906
-~----- -- 11. Depth where SSSV set 17. Land Use Permit:
TPI: x- 553406 y- 6010898 Zone- ASP4
Total Depth: x- ~-- N/A MD
551483 y- 6007813 Zone- ASP4
18. Directional Survey 19. Water depth, if offshore 20. Thickness of Permafrost
DYes IS! No N/A MSL 1800' (Approx.)
21. Logs Run:
MWD , GR , RES, Photo GYRO, GYRO, ABI , IFR 1 CASANDRA
22. CASING, LINER AND CEMENTING RECORD
9$~~~ .. ~ETrING EPTHMD ::SETTING UEI'THTVD ~?i€i ii .... AMOUNT
WT. PER FT. GRAD!'= .10'" I f$OTTOM lOP I f$OTTOM > PUlI.ED
20" 92# H-40 Surface 112' Surface 112' 42" 260 sx Arctic Set (Approx.)
10-3/4" 45.5# L-80 35' 4182' 35' 3139' 1-1/2" 560 sx PF 'L', 475 sx Class 'G'
7-5/8" 29.7# L-80 32' 6182' 32' 4008' 9-7/8" 598 sx Class 'G'
4-1/2" 12.6# L-80 6165' 9893' 4004' 3963' 6-3/4" Uncemented Slotted Liner
23. Perforations open to Production (MD + TVD of Top and 24. ] JBING .·i ..i i
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Slotted Liner 2-7/8",6.5# x 12.6#, L-80 5922' N/A
MD TVD MD TVD
25.. AGID,. e:-rr- i
6192' - 8767' 4011' - 3941'
8933' - 9848' 3950' - 3959' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 87 Bbls of Diesel.
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
November 24, 2004 Electric Submersible Pump
Date of Test Hours Tested PRODUCTION FOR Oil -BBl GAs-MCF WATER-BBl CHOKE SIZE I GAS-Oil RATIO
11/29/2004 12 TEST PERIOD ... 597 312 48 522
Flow Tubing Casing Pressure CALCULATED ... Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE 1195 624 97
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None RBDMS BFl JAN 0 7 2005
r ..'
l..: !-
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
28.
GEOLOGIC MARKER
29.
ORMATION TESTS
NAME
MD
rvD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TUZC
MA
MB1
MB2
MC
NA
NB
NC
NE
NF
OA
OA (2)
4774'
5195'
5213'
5334'
5637'
5724'
5790'
5880'
5935'
6064'
6183'
8940'
3468'
3644'
3653'
3708'
3834'
3866'
3889'
3921'
3941'
3980'
4009'
3950'
None
30. List of Attachments:
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed
Title Technical Assistant
Date / Z f It- ð
MPH-16L1
Well Number
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Walter Quay, 564-4178
204-191
Permit No. I A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IrEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IrEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
IrEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
a STATE OF ALASKA .&
ALAS~IL AND GAS CONSERVATION CO~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Resubmitted: 12/02/04 ;"ithcorrectédhD
1a. Well Status: a Oil o Gas o Plugged o Abandoned o Suspended o WAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 181 Development o Exploratory
OGINJ OWINJ o WDSPL No. of Completions One Other o Stratigraphic o Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 11/1/2004 204-191
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 10/26/2004 . 50- 029-23227-60-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 10/29/2004 . MPH-16L 1
2969' NSL, 4003' WEL, SEC. 34, T13N, R10E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
3770' NSL, 1951' WEL, SEC. 33, T13N, R10E, UM (OA) KBE = 70.5' Milne Point Unit I Schrader Bluff
Total Depth: 9. Plug Back Depth (MD+ TVD)
699' NSL, 3903' WEL, SEC. 33, T13N, R10E, UM (OA) 9915' + 3964' Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 556641 ' y- 6010120' Zone- ASP4 9915' + 3964' Ft ADL 025906
TPI: x- 553406 y- 6010898 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 551483 ' y- 6007813' Zone- ASP4 N/A MD
18. Directional Survey 19. Water depth, if offshore 20. Thickness of Permafrost
181 Yes ONo N/A MSL 1800' (Approx.)
21. Logs Run: 77 pJ/ . ...1/, , (.., 1<íš2. 'InT-> ,,~
.~-
MWD , GR , RES, Photo GYRO, GYRO, ABI , IFR I CASANDRA $" a::/i:/ TV l> 12. 'j ö'Í-
2. CASING, liNER AND CEMENTING RECORD
·9~r4~G V..(r.· PER Fr. GRAD!: ·SEtTINGÐËPTf{tvlp .SETrING·DEPTHT\lt:î ~?i~i\ ~~~~b
TÔÞ . BÔTTOM TOF> I BOTTOM i i
20" 92# H-40 Surface 112' Surface 112' 42" 260 sx Arctic Set (ADDroX.)
10-314" 45.5# L-80 35' 4182' 35' 3139' 1-1/2" 560 sx PF 'L', 475 sx Class 'G'
7-5/8" 29.7# L-80 32' 6182' 32' 4008' 9-7/8" 598 sx Class 'G'
4-1/2" 12.6# L-80 6165' 9893' 4004' 3963' 6-3/4" Uncemented Slotted Liner
23. Perforations op'en to Production (MD + TVD of Top and 24. . ,> iT JalNG .....".....
.......
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Slotted Liner 2-7/8",6.5# x 12.6#, L-80 5922' N/A
MD TVD MD TVD
25. ··Aqlp,, ,ErG; .........
6192' - 8767' 4011' - 3941' I,.,..I:I\!I:N. .........
8933' - 9848' 3950' - 3959' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 87 Bbls of Diesel.
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR Oll-BSl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .. Oll-Bsl GAs-McF WATER-BBl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None R8DMS BFL DEC 1 0 10M N A L ~~:~.(t:LÝ
OR\G\
.~.;
. .. ,'"
5. "'-...".. ~ ,~ /:;F
,.:...,.n........ ....',-~
" -'''''-'''--,, ""';
Form 1 0-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
28.
GEOLOGIC MARKERS
29.
ORMATION TESTS
NAME
MD
rvD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. if no tests
were conducted, state "None".
TUZC
MA
MB1
MB2
MC
NA
NB
NC
NE
NF
OA
OA (2)
4774'
5195'
5213'
5334'
5637'
5724'
5790'
5880'
5935'
6064'
6183'
8940'
3468'
3644'
3653'
3708'
3834'
3866'
3889'
3921'
3941'
3980'
4009'
3950'
None
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Leak-Off Test Summary and a Well Service
Report.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Technical Assistant Date I L - 0 z..
MPH-16l1
Well Number
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Walter Quay, 564-4178
204-191
Permit No. I A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
a STATE OF ALASKA .
ALAS~ AND GAS CONSERVATION COM· ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: l8I Oil o Gas o Plugged o Abandoned o Suspended o WAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 l8I Developmentø Exploratory
OGINJ OWINJ o WDSPL No. of Completions One Other o Stratigraphic /0 Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit t~1 Number
BP Exploration (Alaska) Inc. 11/1/2004 ,
3. Address: 6. Date Spudded 13. AP/,mber
P.O. Box 196612, Anchorage, Alaska 99519-6612 10/26/2004 50-
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 1/ell Name and Number:
Surface: 10/29/2004 , MPH-16L 1
2969' NSL, 4003' WEL, SEC. 34, T13N, R10E. UM 8. KB Elevation (ft): ,(5. Field I Pool(s):
Top of Productive Horizon: KBE = 70.5' / Milne Point Unit I Schrader Bluff
3770' NSL, 1951' WEL, SEC. 33, T13N, R10E, UM (OA)
Total Depth: 9. Plug Back Depth (MD+ TVD~
699' NSL, 3903' WEL, SEC. 33, T13N, R10E, UM (OA) 9931 ' + 4000' Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TV~ 16. Property Designation:
Surface: x- 556641 . y- 6010120 . Zone- ASP4 9931' + 40 ' Ft ADL 025906
TPI: x- 553406 y- 6010898 Zone- ASP4 11. Depth where SSSV¡set 17. Land Use Permit:
~-~- N)Á MD
Total Depth: x- 551483 y- 6007813 Zone- ASP4
18. Directional Survey 19. Water dePth~ffshore 20. Thickness of Permafrost
l8I Yes DNa N/A MSL 1800' (Approx.)
21. Logs Run: / --r7tv~~ &/192 'Ø?D /~.A
MWD , GR , RES, Photo GYRO, GYRO, ABI , IFR I CASANDRA t./, oðß r ffl:> ¡'Z.' ~
22. CASING, LINER AND CEM~TING RECORD
CASING SETTINGUEPi'H MD SETTIN<¥pEPTHTVD Hall: i. AMOUNT
SIZE Wr.PER FT. GRADE TOP BOTTOM TOi" I BOTTOM SIZE ..................... PULLED
20" 92# H-40 Surface 112' SuP(ace 112' 42" 260 sx Arctic Set (Approx.)
10-3/4" 45.5# L-80 35' 4182' /35' 3139' 1-112" 560 sx PF 'L', 475 sx Class 'G'
7-5/8" 29.7# L-80 32' 6182' / 32' 4008' 9-7/8" 598 sx Class 'G'
4-1/2" 12.6# L-80 6165' 9893'/ 4004' 3963' 6-3/4" Uncemented Slotted Liner
/
/
23. Perforations op'en to Production (MD + TVD of To.,e a 24. TUalNGRECORD ........
Bottom Interval, Size and Number; if none,s te no en): SIZE DEPTH SET (MD) PACKER SET (MD)
4-112" Slotted Liner .\ 2-7/8",6.5# x 12.6#, L-80 5922' N/A
MD TVD MD TVD
6192' - 8767' 4011' - 3941' 25. ACID, FRACTI.IRE, CEMENT SQUEEZE,ETC.
8933' - 9848' 3950' - 3959' ¿ 0 V DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
f ltry\ Freeze Protected with 87 Bbls of Diesel.
t;J. II;
./ \
26. / PRODUCTION TEST
Date First Production: / Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested I~~UCTION FOR Oll-Bsl GAs-McF W A TER-BSl CHOKE SIZE I GAS-Oil RATIO
ST PERIOD ...
Flow Tubing Casing pressu.i CALCULATED ... Oll-BSl GAs-McF W A TER-Bsl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
nD! ~Pd t ~
I I . .I
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
28.
GEOLOGIC MARKERS
29.
RMA TION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
TUZC
MA
MB1
MB2
MC
NA
NB
NC
NE
NF
OA
OA (2)
4774'
5195'
5213'
5334'
5637'
5724'
5790'
5880'
5935'
6064'
6183'
8940'
3468'
3644'
3653'
3708'
3834'
3866'
3889'
3921'
3941'
3980'
4009'
3950'
None
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Leak-Off Test Summary and a Well Service
Report.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
ì .
Signed Sondra tewman " . -, ~itle Technical Assistant
MPH-16
Well Number
Date l7", -C'Jl - õ
Permit No. / A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Walter Quay, 564-4178
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
~ 2-9/16" - SM FMC
Wellhead: 11" x 7-1/16" S.
Gen SA, w 2-7/8" FMC Tb .,3"
LH Acme on top and 2-7/8" U 8rd
on bottom, 2.S" CIW BPV Profile
20" x 34" insulated, 215 #/ft A-53 om
103/4" 45.5 ppf L-80 BTRC
(Drift 10 = 9.794, cap. = .0961 bpi)
10 3/4" HOWeO Float Shoe
14182' I
75/8" 29.7 ppl, L-80, BTRC-mod casing
(Drift 10 = 6.750". cap = 0.0459 bpI)
2-7/8" 6.5 ppf. L-80 8rd eue tbg.
( drift id = 2.347" cap = .00592 bpf)
KOP @ 500'
+60 degree from 2850'
Max hole angle = 69 degree @ 5722'
Window in 75/8" Casing @ 6182' - 6194'
Well Angle @ window = 76°
Baker Hook Wall
Hanger inside 7-5/8" Window 16.70'
Baker Hook Wall
Hanger outside 7-5/8" Window 6.15'
Baker Tie Back Sleeve 6309'
Baker ZXP Liner Top Packer 6320'
Baker 7-5/8" x 5" HMC Liner Hanger 6326'
Baker 190-47 Seal Bore Extension 6334'
7-5/8" Weatherford Float Collar 6431'
7-5/8" Weatherford Float Shoe 6515'
DATE
10/31/04
REV. BY
Lee Hulme
MPH-16\LI
Orig. KB elev. = 70.50' (Doyon 14)
orieLDS. elev.= 30.03' (Doyon 14)
OA Lateral
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
149'
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
2114'
Cameo 2-7/8" x1"
KBMM Gas lift mandrel
5694'
HES XN-Nipple (2.205" id)
5846'
ESP Pump, 159 stg. GC1150
GPMTAR 1:1
5867'
Tandem Intake - Gas Separator
Model - GRSFTXAR H6
Tandem Seal Section, I
Model - GSB3 DB UT/L T IL H6 PFS
AFLAS / HSN
Motor, 133 KMH
2205 volt I 37 amp
5885'
5890' I
5904'
PumpMate w/6 fin centralizer
5916'
89 jts. - 41/2" 12.6# L-80, IBT
Slotted Liner (6204'-8779') & (8945'-9859')
6 1/8" Hole td @ 9915' HES 4 1/2" "V" Float Shoe 9905'
6 1/8" Hole td @ 9931' HES 4 1/2" "V" Float Shoe
9967'
87 jts. - 4 1/2", 12.6# L-80, IBT
OB Lower Lateral Slotted Liner (6524' - 8839') & (9173' - 9922')
COMMENTS
MILNE POINT UNIL
WELL MPH-16
API NO: 50-029-23227-00
API NO: 50-029-23227-01
BP EXPLORATION (AK)
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRlll+COMPlETE
DOYON DRilLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
Spud Date: 10/14/2004
End: 11/1/2004
10/8/2004
11/1/2004
10/13/2004 20:00-21:00
21 :00 - 22:30
22:30 - 23:00
23:00 - 23:30
23:30 - 00:00
10/14/2004 00:00 - 01 :30
01 :30 - 08:00
08:00 - 10:30
10:30 - 11 :00
11 :00 - 11 :30
11 :30 - 12:00
12:00 - 12:30
12:30 - 13:30
13:30 - 21 :00
21 :00 - 22:30
22:30 - 00:00
10/15/2004 00:00 - 00:00
10/16/2004 00:00 - 04:00
04:00 - 05:00
05:00 - 07:00
07:00 - 08:00
08:00 - 10:00
10:00 - 12:00
12:00 - 14:30
14:30 - 16:30
16:30 - 17:30
17:30 - 00:00
10/17/2004 00:00 - 03:00
03:00 - 04:30
04:30 - 05:30
05:30 - 06:00
06:00 - 08:00
08:00 - 09:00
09:00 - 10:00
10:00 - 12:00
12:00 - 14:30
14:30 - 16:00
16:00 - 17:00
17:00 - 23:00
23:00 - 23:30
1.00 MOB P
1.50 MOB P
0.50 MOB P
0.50 MOB P
0.50 MOB P
1.50 RIGU P
6.50 RIGU P
2.50 RIGU P
0.50 DRILL P
0.50 DRILL P
0.50 DRILL P
0.50 DRILL P
1.00 DRILL P
7.50 DRILL P
1.50 DRILL N
1.50 DRILL P
24.00 DRILL P
4.00 DRILL P
1.00 DRILL P
2.00 DRILL P
1.00 DRILL P
2.00 DRILL P
2.00 DRILL N
2.50 DRILL N
2.00 DRILL N
1.00 DRILL N
6.50 DRILL P
3.00 DRILL P
1.50 CASE P
1.00 CASE P
0.50 CASE P
2.00 CASE P
1.00 CASE P
1.00 CASE P
2.00 CASE P
2.50 CASE P
1.50 CASE P
1.00 CASE P
6.00 CASE P
0.50 CASE P
'PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
SURF
SURF
SURF
SURF
¡SURF
SURF
DFAL SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
DFAL SURF
DFAL SURF
DFAL SURF
DFAL SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
Skid rig floor to moving position
Move off MPH-18, move to MPH-16
Herculite rockwasher position
Skid rig floor to Drilling position
Rigging up floor and spot rockwasher
Nipple up Diverter and Diverter lines, Rig accept @ 00:01
1 0/14/2004
load pipe shed, Picking up 4" drill pipe and standing in derrick
Picking up BHA #1
Diverter test, the right to witness test was wavier by John Crisp
AOOGC
Pre spud meeeting
Fill stack and check for leaks
Drill, 112' to 166'
Stand back 5 hwdp, make up 8" flex collars
Drill 166' to 611' with 70 rpms, 420 gpm, 1200 psi, run gyros
every 100 ft. last gyro to be run 700 ft.
Four missed runs with gyro surveys.
Drill from 611' to 757' with 70 RPMs, 420 gpm, 1200 psi. Last
survey run at 700'. AST 2.47 ART 3.57
Drill 757' to 2624' with 80 rpms, 500 gpm, 2250 psi, AST
14.61, ART 2.34
Hydrates encountered @ 1875 to 2100', mud cut from 9.6 to
7.9
Drill 2624' to 2912' with 80 rpms, 500 gpm, 2500 psi
Circ two bottoms up with 500 gpm, 2500 psi, 80 rpms
Pumping out to HWDP with full drilling rate
RIH to bottom, wash last stand to bottom
Drill 2912' to 3121' with 80 rpms,500 gpm, 2500 psi. 1000 psi
increase in pump pressure off bottom, possible mech. failure,
pump pressure 3780 psi with 440 gpm
Pumping out to BHA
Stand back BHA, found two alien head screws in jets, from
mud motor, lay down MWD and mud motor
P/U new mud motor, MWD, RIH with BHA, surface test MWD
Trip to bottom, washed last stand to bottom
Drilling 3121' to 3769' with 80 rpms, 525 gpm, 2700 psi, AST
3.61, ART 3.96
Drill 3769' to 4190' TD, with 80 rpms, 550 gpms, 3100 psi
Circ, Two bottoms up with 80 rpms, 550 gpm 3100 psi
Pump out to 3,000' with full drilling rate
Rih, wash last stand to bottom
Circ. Three bottoms up with 80 rpms, 550 gpm, 3100 psi
Pump out to 2800' with full drilling rate
Change out saver sub on top drive
Pump out to HWDP with full drilling rate
Stand back HWDP and lay down flex dc and MWD and motor
Clear rig floor
Rig up to run 10 3/4 csg, PJSM
Picking up 103/445# L-80 btc csg, total of 100 jts , PIU 250K,
S/o 130K, shoe 4182, float 4095, (had trouble getting thru base
of permafrost)
Lay down franks tool and rig up cement head
Printed: 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
1 0/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
10/17/2004 23:30 - 00:00 0.50 CASE P SURF Circ and thin mud for cement job.
10/18/2004 00:00 - 01 :30 1.50 CASE P SURF Circ and thin mud for cement job, 378 gpm, 300 psi, PJSM on
cementing
01 :30 - 04:30 3.00 CEMT P SURF Cement with Schlumberger with 5 bbls water, test lines 3500
psi, 10 bbls water, 15 bbls CW100, 75 bbls 10.6 Mud push,
drop bottom plug, 560 sxs ASL 438 bbls Yield 4.44 mixed at
10.7, tail with 475 sxs. Class G, 99 bbls pumped 8 bbls min.
yield 1.17 mixed at 15.8, drop top plug, kicked out with 30 bbls
water, displace with rig pump 7 bbls min. 394 bbls, full returns
thru out job, bump plug with 1750 psi, float held, 275 bbls good
cement to surface
04:30 - 06:00 1.50 CASE P SURF Flush stack, laying down cement head, landing jt.
06:00 - 07:00 1.00 CASE P SURF I Nipple down Diverter
07:00 - 08:00 1.00 CASE P SURF I Nipple up starting head, test seal to 1000 psi for 10 min.
08:00 - 10:00 2.00 CASE P SURF i Nipple up BOPS
10:00 - 15:00 5.00 CASE P SURF iT est BOPS and Manifold to 250- 3500 psi 5 min. per test,
I Hydrill 250-2500 psi 5 min. per test, witness by Jeff Jones
AOOGC, install wear ring
15:00 - 18:00 3.00 CASE P SURF Picking up BHA # 3, suface test MWD
18:00 - 19:30 1.50 CASE P SURF Trip in to 4060'
19:30 - 21 :00 1.50 CASE P SURF Circ, one drill pipe vol., Test csg to 2000 psi for 30 min.
21 :00 - 22:00 1.00 CEMT P SURF Drill cement and shoe track, drill new hole to 4210' with 60
rpms, 424 gpm, 1850 psi
22:00 - 22:30 0.50 CASE P SURF Circ, bottoms up
22:30 - 23:30 1.00 CASE P SURF Pump hi vis sweep, displace well with new 10.5 LSND mud
23:30 - 00:00 0.50 DRILL P INT1 Fit test with 10.5 mud wt. 325 psi, = 12.5 EMW, holding
pressure bleed to 180 psi in 10 min.
10/19/2004 00:00 - 00:30 0.50 DRILL P INT1 Finish Fit test with 10.5 mud wt. 325 psi, = 12.5 EMW, holding
pressure bleed to 180 psi in 10 min., blow down choke lines
00:30 - 00:00 23.50 DRILL P INT1 Drill 4210' to 6310' with 80 rpms, 500 gpms, 3500 psi, AST
8.13, ART 7.01
10/20/2004 00:00 - 02:00 2.00 DRILL P INT1 Drill 6310' to 6525' TD with 80 rpms, 500 gpms, 3600 psi
02:00 - 04:00 2.00 DRILL P INT1 Circ. Three bottoms up with 100 rpms. 500 gpm, 3600 psi
04:00 - 06:00 2.00 CASE P INT1 Pumping out to csg shoe @ 4182, with full drilling rate
06:00 - 07:00 1.00 CASE P INT1 Circ, one bottoms up, with 500 gals min., 2600 psi
07:00 - 08:30 1.50 CASE P INT1 Cut and slip drilling line, service top drive
08:30 - 09:00 0.50 CASE P INT1 RIH to 6525', wash last stand to bottom
09:00 - 11 :30 2.50 CASE P INT1 Circ Three bottoms up with 500 gpm, 3600psi, 100 rpms
11 :30 - 13:30 2.00 CASE P INT1 Pumping out to csg shoe @ 4182, with full drilling rate
13:30 - 14:30 1.00 CASE P INT1 Circ one bottoms up with 500 gpms, 40 rpms 2900 psi
14:30 - 15:30 1.00 CASE P INT1 Poh to HWDP
15:30 - 18:00 2.50 CASE P INT1 Lay down BHA
18:00 - 18:30 0.50 CASE P INT1 Clear rig floor
18:30 - 20:00 1.50 CASE P INT1 PJSM, Pull wear ring, install test plug, install 75/8 rams, test
door seals to 1500 psi
20:00 - 21 :00 1.00 CASE P INT1 PJSM, Rig up to run casing
21 :00 - 00:00 3.00 CASE P INT1 Picking up 7 5/829# L-80 Btc csg, change out tongs, to 2200'
10/21/2004 00:00 - 02:00 2.00 CASE P INT1 Picking up 7 5/8 29# L-80 Btc csg, to 4150'
02:00 - 02:30 0.50 CASE P INT1 Circ, casing volume of 191 bbls
02:30 - 04:30 2.00 CASE P INT1 Picking up 7 5/8 29# L-80 Btc csg, to 6515' land csg. with shoe
@ 6515 float 6431' total of 158 jts run, P/U wt 225k, S/O wt
115K, Circ wts P/U 200K, S/o 100
04:30 - 05:00 0.50 CASE P INT1 Rig down Franks tool and rig up cement head
Printed: 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
10/21/2004 05:00 - 07:00 2.00 CASE P INT1 Circ and reciprocate csg for two csg volumes 598 bbls., 6 bbls
min. 600 psi
07:00 - 08:30 1.50 CEMT P INT1 Cement with Schlumberger 5 bbls water, test lines to 3000
psi.25 bbls CW-1 00,30 bbls mud push Mixed @ 11.5, drop
bottom plug, 123 bbls 598 sxs. class G yield 1.16 mixed @
15.8, drop top plug, displace with 295 bbls oil mud 10.5, pump
plug with 1800 psi, Reciprocate csg thru out job, displace 6
bbls min 800 psi, float held
08:30 - 09:30 1.00 CEMT P INT1 Blow down Schlumberger, close hydrill inject 34 bbls water
down 10 3/4 X 7 5/8 annulus
09:30 - 10:30 1.00 CASE P INT1 Void 7 5/8 landing jt., flush stack, install pack off and test same
to 5000 psi for 10 min.
10:30 - 11 :30 1.00 CASE P INT1 Change out top rams to 2 7/8 X 5'
11 :30 - 12:00 0.50 CASE P INT1 Change out Bails and lay down Csg equipment
12:00 - 13:30 1.50 CASE P INT1 Test top rams 250-3500 psi 5 min. per test, rig down test
equipment.
13:30 - 16:00 2.50 CASE P INT1 Picking up BHA # 4, surface test MWD
16:00 - 19:00 3.00 CASE P INT1 RIH to 6315'
19:00 - 20:30 1.50 CASE P INT1 Circ one drill pipe volume, Test Csg to 2500 psi for 30 min.
20:30 - 21 :30 1.00 CEMT P INT1 Drill Cement and shoe track and new hole to 6545' with 70
rpms, 272 gpm, 2900 psi
21 :30 - 22:30 1.00 CEMT P INT1 Circ bottoms up for FIT, 272 gpm,2900 psi, 70 rpms
22:30 - 23:00 0.50 CEMT P INT1 Fit test with 10.5 Mud wt. 420 psi, 4063 TVD= 12.5 EMW
23:00 - 00:00 1.00 DRILL P PROD1 Drilling 6545' to 6600' with 70 rpms, 275 gpm, 3100 psi, ECD
11.5. AST .35, ART .03
10/22/2004 00:00 - 08:30 8.50 DRILL P PROD1 Drilling 6600' to 7376' with 70 rpms, 275 gpm, 3100 psi, ECD
11.6
08:30 . 09:30 1.00 STKOH P PROD1 Pumped out to 6937' , cut trench 6937 to 6947', side track well
@ 6947'
09:30 - 00:00 14.50 DRILL P PROD1 Drilling 6947' to 8,231 with 70 rpms, 275 gpms, 3200 psi, ECD
11.9, AST 5.4, ART 8.27
10/23/2004 00:00 - 04:00 4.00 DRILL P PROD1 Drilling 8,231 to 8662' with 80 rpms, 275 gpms, 3200 psi,
ECD up to 12.6
04:00 - 06:00 2.00 DRILL P PROD1 Circ. to lower ECD and make mad pass ECD 12.5 drop to
12.0
06:00 - 07:00 1.00 DRILL P PROD1 Poh to 8390', Mad pass 8388' to 8348', RIH 8662'
07:00 - 09:00 2.00 DRILL P PROD1 Drilling 8662' to 8882' with 80 rpms, 275 gpms, 3200 psi
09:00 - 10:00 1.00 STCTPL P PROD1 Circ for sidetrack
10:00 - 11 :30 1.50 STKOH P PROD1 Pump out to 8040, cut trench from 8094' to 8104'
11 :30 - 00:00 12.50 DRILL P PROD1 Drilling 8094' to 9192 with 100 rpms, 275 gpm, 3400 psi, cross
fault @ 8824', AST 7.86, ART 6.42 ECD 12.2
10/24/2004 00:00 - 01 :00 1.00 DRILL P PROD1 Circ, one bottoms up with 292 gpm, 3600 psi, 110 rpms to
clean up hole ECD 12.5 dropping to 12.2
01 :00 . 01 :30 0.50 DRILL P PROD1 Drill 9194' to 9244 with 275 gpms,3400 psi, 100 rpms
01 :30 - 02:00 0.50 DRILL P PROD1 Circ. with 292 gpm, 3600 psi, 110 rpms, Talking to town., 362 ft
of none pay from 8824' to 9186', back in O-B 9,186'
02:00 - 05:00 3.00 DRILL P PROD1 Drill 9244' to 9479' with 275 gpms,3400 psi, 100 rpms ECD
12.3, went out top of O-B
05:00 - 05:30 0.50 STKOH P PROD1 Circ. with 292 gpm, 3600 psi, 110 rpms, Talking to town.
05:30 - 07:00 1.50 STKOH P PROD1 POH to 9204' for side track, Circ and cut trench 9245 to 9269',
side track well @ 9245'
07:00 - 08:00 1.00 STKOH P PROD1 Time drill 9255' to 9289'
08:00 - 10:00 2.00 DRILL P PROD1 Drill 9289' to 9396 with 275 gpms,3400 psi, 100 rpms
Printed; 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
1 0/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
1 0/24/2004 10:00 - 11 :30 1.50 DRILL N DFAL PROD1 Bit stuck. @ 9396 worked and jarred free, pump pressure
increase 500 psi over normal, motor not acting right
11 :30 - 15:00 3.50 DRILL N DFAL PROD1 Pumping out of hole to 6515' csg shoe with 2 bbls min., 1420
psi
15:00 - 19:00 4.00 DRILL N DFAL PROD1 Poh 6515' to BHA
19:00 - 20:00 1.00 DRILL N DFAL PROD1 Standing back BHA, lay down MWD and motor, motor had
parted a pin, 7 ft up from bit. bit and bottom of motor was
pulled out of hole by drive shaft of motor.
20:00 - 23:00 3.00 DRILL N DFAL PROD1 Picking up BHA #5, with new bit, motor and MWD, Surface test
MWD, Abi not working, no backup
23:00 - 00:00 1.00 DRILL N DFAL PROD1 Rih to 4108
1 0/25/2004 00:00 - 01 :00 1.00 DRILL N DFAL PROD1 Rih to 6505'
01 :00 - 02:30 1.50 DRILL P PROD1 Service top drive, cut and slip drilling line
02:30 - 04:00 1.50 DRILL N DFAL PROD1 RIH to 9300', wash last stand to bottom
04:00 - 04:30 0.50 DRILL P PROD1 Circ due to high ECD 12.7 dropped to 12.1
04:30 - 13:30 9.00 DRILL P PROD1 Drill 9396' to 9967' with 80 rpms, 275 psi, 3500 psi
13:30 - 16:00 2.50 DRILL P PROD1 Circ for liner, with 275 gpms, 3600 psi. 80 rpms
16:00 - 19:30 3.50 CASE P PROD1 Pumping out to csg shoe @ 6515 with full drilling rate
19:30 - 20:30 1.00 CASE P PROD1 Circ bottoms up @ csg shoe
22:30 - 23:30 1.00 CASE P PROD1 POH to BHA. Laying down BHA
23:30 - 00:00 0.50 CASE P PROD1 Rig up to pickup 4.5 liner
10/26/2004 00:00 - 00:30 0.50 CASE P PROD1 PJSM on picking up liner
00:30 - 03:30 3.00 CASE P PROD1 Picking up 4.5. 12.6# L-80 slotted liner, 74 Slotted jts, 13 Solid
jts, 3606 ft total, baker Seal bore,Baker HMC hanger,Baker
103:30 - 04:30 ZXP liner top packer
1.00 CASE P PROD1 RIH to 6450. break circ.
04:30 - 05:00 0.50 CASE P PROD1 Circ 1 DP Vol - 3 bpm @ 450 psi - 30 bbls pumped
05:00 - 06:30 1.50 CASE P PROD1 Con't RIH from 6450' to 9667'
06:30 - 07:30 1.00 CASE P PROD1 Break circ - drop ball - pump to seat - set hanger with 1800 psi
. set packer with 3450 psi - Test backside to 1500 psi - 5 mins-
Good test - Release from hanger - Function top rams
07:30 - 08:30 1.00 CASE P PROD1 CBU 1 X - 5 bpm - 800 psi· Recip pipe - Flow check - Well
static· Pump dry job
08:30 - 10:30 2.00 CASE P PROD1 POOH from 6261' to Baker running tool
10:30 - 11 :00 0.50 CASE P PROD1 Service break running tool
11:00 -13:00 2.00 STWHIP P PROD2 Pick up 31/2" HWT - 4 3/4" DC's - Flush same - Stand back in
derrick -
13:00 - 15:00 2.00 STWHIP P PROD2 PJSM - Pick up - Make up - Whipstock to MWD - Orient - Con't
RIH with BHA - Surface Test MWD
15:00 - 18:00 3.00 STWHIP P PROD2 Con't RIH from 875' to 6320'
18:00 - 18:30 0.50 STWHIP P PROD2 Orient Whipstock 21 degree to left of high side - Set anchor-
Shear off
18:30 - 23:30 5.00 STWHIP P PROD2 Milling window from 6182' TOW to 6194' BOW - Drill new hole
from 6194' to 6208' - Pump sweep @ 6190' - 6208' - PP 2190-
275 gpm - WOM 2 to 3 . RPM 80 to 95 - TQ 4 - PU 118 - SO
93 - ROT 100 - Flow check - Well Static - Pump dry job
23:30 - 00:00 0.50 STWHIP P PROD2 POOH with milling assy from 6190' to 5143'
10/27/2004 00:00 . 01 :30 1.50 STWHIP P PROD2 POH with milling assy from 5143' to 875'
01 :30 - 02:30 1.00 STWHIP P PROD2 Stand back 4 3/4" DC's - 3 1/2 HWT - LD MWD and milling
tools
02:30 - 03:00 0.50 STWHIP P PROD2 Clear rig floor - Lay down Baker tools
03:00 - 04:00 1.00 DRILL P PROD2 Flush BOP's - Function BOP's - Flush flowline
04:00 - 05:00 1.00 DRILL P PROD2 Make up bit - motor - MWD - Orient - Surface test MWD
Printed: 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
1 0/27/2004 05:00 - 07:00 2.00 DRILL P PROD2 RIH from 270' to 6111' - Fill pipe every 25 stds
07:00 - 07:30 0.50 DRILL P PROD2 Rig service - Top drive service - Blocks / Crown
07:30 - 08:00 0.50 DRILL P PROD2 Orient motor - Exit window - Set Drlg parimeters - RIH to 6208'
08:00 - 00:00 16.00 DRILL P PROD2 Directional Drill OA Lateral from 6208' to 7836' - WOB x - RPM
60 to 70 - TO on 4 - off 3 - GPM 275 - PP on 3320 - off 3160-
PU 130 - SO 80 - ROT 105
10/28/2004 00:00 - 02:30 2.50 DRILL P PROD2 Directional Drill from 7836' to 8123' - WOB 2 to 6 - RPM 60 to
70 - TO on 4 - off 3 - GPM 275 - PP on 3450 - off 3324 - PU
132 - SO 80 - ROT 105
02:30 - 04:00 1.50 DRILL P PROD2 CBU 2 X - GPM 300 - PP 3320 - RPM 85 - TO 4
04:00 - 05:30 1.50 DRILL P PROD2 Pump out of the hole from 8,123' to 6,150' at full drilling rate -
Slight packing off from 6650' to 6296' - Pull without pump from
6296' to 6108' through window - No problems
05:30 - 06:30 1.00 DRILL P PROD2 Circulate Bottoms Up While Rotating And Reciprocating Drill
String - 275 gpm, 60 RPM
06:30 - 07:30 1.00 DRILL P PROD2 Orient Mud Motor And Slide Thru Whipstock Window With No
Problem - RIH From 6,170' To 8,027' - As Precaution Wash
Last Stand To Bottom From 8,027' To 8,123'
07:30 - 22:00 14.50 DRILL P PROD2 Drilled 63/4" Directional Hole By Rotating And Sliding From
8,123' To 9,179' WOB Rotating 4,000# - 5,000#, RPM 60,
Motor RPM 208, Torque Off Bottom 4,000 ft / Ibs - On Bottom
5,000 ft / Ibs, Pump Rate 272 gpm, SPP Off Bottom 3360 psi,
On Bottom 3,460 psi. String Weight Up 145,000#, String
Weight Down 52,000#, String Weight Rotating 100,00#.
22:00 - 23:00 1.00 DRILL P PROD2 CBU 1 X - Circulate hole clean - Not able to slide - 275 gpm -
3360 ICP - FCP 3250 - RPM 80
23:00 - 00:00 1.00 DRILL P PROD2 Directional Drill from 9179' to 9243' - WOB 4 to 5 - RPM 60-
TQ on 6 - off 4 - GPM 275 - PP on 3360 - off 3250 - PU 140-
SO 60 - ROT 100
10/29/2004 00:00 - 08:30 8.50 DRILL P PROD2 Directional Drill from 9243' to 9915' - TD OA Lateral- WOB 3 to
6 - RPM 60 - TO on 5 - off 4 - GPM 275 - PP on 3410 - off
3380 - PU 135 - SO 65 - ROT 100
08:30 - 10:30 2.00 CASE P PROD2 CBU 2 X - GPM 275 - PP 3560 - RPM 65 - TO 5
10:30 - 12:00 1.50 CASE P PROD2 Flow check - Well Static - Pump out from 9915' to 8028'-
Pump at drlg rate
12:00 - 13:30 1.50 CASE P PROD2 CBU 1 X - GPM 275 - PP 3480 - RPM 65 - TO 5
13:30 - 14:30 1.00 CASE P PROD2 RIH from 8028' to 9820' - Wash from 9820' to 9915'
14:30 - 17:00 2.50 CASE P PROD2 CBU 3 X - GPM 275 - PP 3490 - RPM 65 - TO 5
17:00 - 20:30 3.50 CASE P PROD2 Pump out from 9915' to 6297' - Pull without pump from 6393' to
6101' through window - No problems
20:30 - 22:00 1.50 CASE P PROD2 CBU - 1 X - GPM 275 - RPM 40 - TO 4.5 - PP 3000 - Lot of
sand over shakers - Flow check - Well static - Pump dry job
22:00 - 00:00 2.00 CASE P PROD2 POH from 6101' to 1200'
10/30/2004 00:00 - 00:30 0.50 CASE P PROD2 Con't POH from 1200' to BHA @ 270'
00:30 - 01 :30 1.00 CASE P PROD2 Stand back Flex De's - HWT - LD jars - LD MWD - Flush motor
- Break bit - LD motor
01 :30 - 02:30 1.00 CASE PROD2 Clear rig floor of BHA tools
02:30 - 03:30 1.00 CASE P PROD2 PU Baker retrieving tool for pulling WS - Make up MWD -
Orient - Con't RIH with Retieving BHA . Surface test MWD - 6.7
bpm - @ 1500 psi
03:30 - 05:00 1.50 CASE P PROD2 RIH with Retrieving assy from 750' to 6100'
05:00 - 05:30 0.50 CASE P PROD2 Break Circ - Orient Hook to 21 degree left of high side - Latch
onto Whip stock - pull free - PU 118 - S) 94 - Flow check - Well
Printed: 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
10/30/2004 05:00 " 05:30 0.50 CASE P PROD2 static
05:30 - 06:00 0.50 CASE P PROD2 CBU" GPM 275 - PP 2250 - Flow check - Pump dry job
06:00 " 09:30 3.50 CASE P PROD2 POH with Whip stock
09:30 - 11 :00 1 .50 I CASE P PROD2 LD MWD - Retrieval tool and whipstock assembly
11 :00 - 12:00 1.00 CASE P PROD2 Clear rig floor
12:00 - 15:00 3.00 CASE P PROD2 PJSM - Pick up 4 1/2" slotted liner" Total 84 jts 4 1/2" slotted
I 12.6# L-80 IBT liner" 4 jts 41/2" 12.6# L"80 IBT solid liner" 1 4
1/2" 12.6# L-80 IBT Bent jt with float shoe" Total jts ran 89
15:00 " 15:30 0.50 CASE P PROD2 Make up Baker hook wall hanger" Liner running tool - PU 80 -
SO 77
15:30 - 19:00 3.50 CASE P PROD2 RIH with liner on 4" dp from 3738' to 6182' "work liner through
window - Three attempts to exit window - PU 112 " SO 92 "
Con't RIH with liner" Work centralizers through window on
stands 37 through 44 - stands 47.49,50, 51. 58, and 59
19:00 - 20:30 1.50 CASE P PROD2 Hook hanger @ 6194' shoe @ 9905' " Pick up release hook -
I RIH with hanger to 6204' shoe at 9915'" Pull back to 6174'
hanger depth shoe depth 9885' - rehook hanger @ 6194' shoe
9905' - Break circulation 3 bpm @ 580 psi" Drop 29/32 ball "
Pump ball 3 bpm @ 580 psi 300 strokes - Slow to 1.5 bpm @
290 psi for 236 strokes - Ball on seat - Pressure up to 3700 psi
- Bleed off presure to zero - Pick up to confirm released off
liner - (SPM's directed by Baker Rep) " Liner released
20:30 - 21 :00 0.50 CASE P PROD2 Rig up pump in sub - Cement line - Test pump" (For shear out
of ball and seat)
21 :00 - 21 :30 0.50 CASE P PROD2 Pump to 4000 psi with rig pump - Shut down" Switch to test
pump - Con't pressure up to shear out ball and seat at 4400 psi
- Ball sheared
21 :30 - 22:00 0.50 CASE P PROD2 CBU 1 X - Flow check" Well static - Pump dry job
22:00 - 00:00 2.00 CASE P PROD2 POH with Baker liner running tool From 6015' to BHA @ 750'
10/31/2004 00:00 - 00:30 0.50 CASE P PROD2 Service break Baker running tool - LD running tool - Clear rig
floor
00:30 " 01 :00 0.50 CASE P PROD2 Make up circ sub - RIH with DC's" HWT
01 :00 " 02:00 1.00 CASE P PROD2 PJSM - Cut drlg line - Rig service
02:00 - 03:00 1.00 CASE P PROD2 RIH with circ sub to 6170'
03:00 - 04:00 1.00 CASE P PROD2 Rig up to displace" PJSM on displacing Oil base mud
04:00 - 05:00 1.00 CASE P PROD2 Displace oil base mud with:
15 bbls LVT-200
20 bbls Viscosified 10.5 brine
20 bbls water with 1 drum Safe Surf "0"
20 bbls Viscosified 10.5 brine
304 bbls 10.5 brine with 2 drums Corrosion Inhibitor
Pump at 9.5 bpm @ ICP 3000 - FCP 2100 - RPM 110 - TQ 5
05:00 - 08:30 3.50 CASE P PROD2 Lay down 4" drill pipe
08:30 - 10:30 2.00 CASE P PROD2 Run remaining 4" dp in hole from derrick
10:30 - 15:30 5.00 CASE P PROD2 Lay down 4" drill pipe - 31/2" HWT - 4 3/4" DC's - Pull Wear
ring - Clear rig floor
15:30 - 16:00 0.50 CASE P PROD2 Rig up Power tongs - Slips - Elevators - Centrilift equipment -
Spooler for ESP cable
16:00 - 19:00 3.00 CASE P PROD2 PJSM - Make up ESP pump - Service pump" Test
19:00 - 00:00 5.00 CASE P PROD2 PJSM - Pick up and run 2 7/8" Completion - Break circulation 1
bpm @ 1410 psi / test ESP cable every 2000' - Total jts ran
130 Depth 4056'
11/1/2004 00:00 - 02:00 2.00 RUNCO RUNCMP Con't running 2 7/8" ESP completion from 4056' to 5888' -
Printed: 11/8/2004 8:35:04 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPH-16
MPH-16
DRILL+COMPLETE
DOYON DRILLING INC.
DOYON 14
10/8/2004
11/1/2004
Spud Date: 10/14/2004
End: 11/1/2004
Start:
Rig Release:
Rig Number:
02:00 - 02:30
02:30 . 04:00
04:00 - 05:00
05:00 - 06:30
06:30 - 08:00
08:00 - 08:30
08:30 - 09:30
09:30 - 11 :00
11:00-12:00
1.50
1.00
Break circulation at 1 bpm @ 1410 psi / test ESP cable every
2000' - Pick up landing joint - Make up landing joint to FMC
tubing hanger and tubing hanger to string - Total joints 2 7/8"
EUE 8rd ran 183 - Total LaSalle clamps ran 100 - 5 each
protectolizers - 3 each flat guards - PU 82 - SO 70 - Block
weight 50
RUNCMP Rig up circ line - Break circ - Pump 10 bbls to clear debri from
tubing 1 bpm @ 1500 psi - Rig dwn circ lines
RUNCMP Make up ESP cable to hanger and test
RUNCMP RIH with completion string from 5888' to 5922' - Land tubing
hanger - RILDS - Test TWC to 1000 psi - Bleed off pressure-
Back out landing joint
RUNCMP Nipple down BOP's
RUNCMP Nipple Up Tubing Head Adapter And 2 9/16" 5M Production
Tree
RUNCMP Test Tubing Hanger - Pack Off - And Production Tree To
5,000 Psi. (Test Good)
RUNCMP Pull TWC And Install BPV
RUNCMP Hold PJSM With Little Red Hot Oil Services - Freeze Protect
Tubing And IA Down To 500 Feet - Final Tubing Pressure At
600 Psi. And IA Pressure At 400 Psi.
RUNCMP Secure Well Head And Production Tree - Remove Secondary
Annulus Valve - Vacuum Out Celler
1.50 BOPSU P
1.50 WHSUR P
0.50 WHSUR P
1.00 WHSUR P
1.50 WHSUR P
1.00 WHSUR P
Release Doyon Rig 14 From Well Work On MPH-16 At 12:00
Hours On 11-1-2004
Printed: 11/812004 8:35:04 AM
· WELL SERVICE REPORT
WELL
MPH-16
DATE
11/2/2004
AFE
MSD337410
JOB SCOPE
NEW WELL POST
DAILY WORK
FREEZE PROT
KEY PERSON
LRS-BRENNY TOM
MINID
0"
DEPTH
OFT
UNIT
LRS 62
DAY SUPV
HULME
NIGHT SUPV
UNKNOWN
TTL SIZE
0"
DAILY SUMMARY
Freeze protected tubing and IA. Pumped 19 bbls diesel down tubing and 68 bbls diesel dowñ the IA.
SPM set u added to indicate the status of the SPM's in the well.
-..'-.--..-'.-
FLUID sUMMAFty________
87 bbls diesel
SERVICE COM~~N.\(:_SERVICE DAILY COST CUMULTOTAL
LITTLE RED $0 $705
WAREHOUSE $0 $3,570
TOTAL FIELD ESTIMATE: $0 $4,275
2,636 (psi) 12.49 (ppg)
-
Printed: 11/8/2004 8:34:57 AM
420 (psi
0.50 (ppg)
(
3,
4,063.0
4,210.0 (It
6,515.0 (ft)
10/18/2004 I FIT
10/21/2004 FIT
Halliburton Sperry-Sun
Milne Point Unit
BPXA
MPH-16L1
.
Job No. AKZZ3330703, Surveyed: 29 October, 2004
Survey Report
10 November, 2004
Your Ref: API 500292322760
Surface Coordinates: 6010120.38 N, 556641.19 E (70026' 17.8695" N, 210027' 42.6435" E)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Kelly Bushing Elevation: 70.25ft above Mean Sea Level
SpE!ï'f""'V-SUI'1
CAIL-L.ING seAVIc:es
A Halliburton Company
Survey Ref: svy1498
Halliburton Sperry-Sun
Survey Report for MPH-16L 1
Your Ref: API 500292322760
Job No. AKZZ3330703, Surveyed: 29 October, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
6106.87 76.310 223.480 3920.51 3990.76 856.39 N 3178.87 W 6010952.60 N 553455.90 E 2555.72 Tie On Point
.. 6182.00 76.410 222.670 3938.23 4008.48 .- 803.06 N 3228.74 W 6010898.89 N 553406.45 E 1.056 2622.97 Window Point
6233.24 84.630 220.400 3946.66 4016.91 765.25 N 3262.21 W 6010860.83 N 553373.26 E 16.626 2668.92
6281.00 90.310 218.800 3948.77 4019.02 728.50 N 3292.61 W 6010823.85 N 553343.14 E 12.354 2711.64
6328.18 94.020 215.800 3946.98 4017.23 691.01 N 3321.17W 6010786.15 N 553314.87 E 10.109 2752.98 .
6376.78 94.330 211.260 3943.44 4013.69 650.62 N 3347.94 W 6010745.55 N 553288.41 E 9.339 2793.86
6423.04 94.390 209.960 3939.93 4010.18 610.92 N 3371.43 W 6010705.67 N 553265.22 E 2.805 2831.47
6472.37 93.460 207.290 3936.55 4006.80 567.72 N 3395.00 W 6010662.30 N 553241.98 E 5.719 2870.57
6519.19 90.060 205.620 3935.11 4005.36 525.83 N 3415.84 W 6010620.25 N 553221.45 E 8.090 2906.65
6567.16 90.250 204.400 3934.98 4005.23 482.36 N 3436.12 W 6010576.63 N 553201.50 E 2.574 2942.86
6616.11 90.490 207.900 3934.67 4004.92 438.43 N 3457.69 W 6010532.54 N 553180.27 E 7.167 2980.43
6664.50 93.030 209.290 3933.18 4003.43 395.97 N 3480.84 W 6010489.90 N 553157.44 E 5.983 3018.85
6711.96 93.270 208.930 3930.57 4000.82 354.57 N 3503.89 W 6010448.32 N 55313470 E 0.911 3056.75
6760.06 93.710 207.070 3927.64 3997.89 312.18 N 3526.43 W 6010405.76 N 553112.49 E 3.967 3094.58
6807.99 91.910 207.350 3925.29 3995.54 269.60 N 3548.32 W 6010363.02 N 553090.92 E 3.801 3131.89
6857.20 92.040 207.660 3923.60 3993.85 225.98 N 3571.03 W 6010319.23 N 553068.54 E 0.683 3170.39
6905.20 92.470 206.620 3921.71 3991.96 183.30 N 3592.91 W 6010276.39 N 553046.99 E 2.343 3207.73
6956.66 90.120 208.310 3920.55 3990.80 137.66 N 3616.64 W 6010230.56 N 553023.61 E 5.624 3247.97
7001.08 90.190 211.860 3920.43 3990.68 99.23 N 3638.90 W 6010191.97 N 553001.64 E 7.993 3283.94
7049.39 91.360 212.470 3919.77 3990.02 58.34 N 3664.62 W 6010150.88 N 552976.24 E 2.731 3324.07
7095.69 91.790 212.120 3918.50 3988.75 19.21 N 3689.34 W 6010111.57 N 552951.81 E 1.197 3362.57 .
7142.55 91.970 211.530 3916.96 3987.21 20.58 S 3714.04 W 6010071.59 N 552927.41 E 1.316 3401.32
7191.40 92.040 210.390 3915.25 3985.50 62.44 S 3739.16 W 6010029.54 N 552902.62 E 2.337 3441.29
7238.51 91.980 207.570 3913.60 3983.85 103.63 S 3761.96 W 6009988.18 N 552880.12 E 5.984 3478.87
7287.86 92.600 207.200 3911.63 3981.88 147.41 S 3784.65 W 6009944.23 N 552857.77 E 1 .463 3517.40
7335.48 91.730 205.530 3909.83 3980.08 190.04 S 3805.78 W 6009901.44 N 552836.97 E 3.952 3554.05
7384.30 90.370 205.980 3908.94 3979.19 234.01 S 3826.99 W 6009857.31 N 552816.09 E 2.934 3591.30
7431.24 90.620 205.840 3908.53 3978.78 276.23 S 3847.50 W 6009814.94 N 552795.90 E 0.610 3627.21
7480.15 91.300 204.640 3907.71 3977.96 320.46 S 3868.35 W 6009770.55 N 552775.39 E 2.820 3664.25
7527.31 89.810 203.790 3907.25 3977.50 363.47 S 3887.69 W 6009727.40 N 552756.37 E 3.637 3699.42
7575.60 90.370 203.910 3907.18 3977.43 407.63 S 3907.22 W 6009683.08 N 552737.18 E 1.186 3735.22
7622.54 90.060 202.230 3907.00 3977.25 450.82 S 3925.61 W 6009639.76 N 552719.12 E 3.639 3769.59
7671.89 88.950 205.830 3907.43 3977.68 495.88 S 3945.70 W 6009594.55 N 552699.37 E 7.633 3806.27
7717.64 90.800 207.200 3907.53 3977.78 536.81 S 3966.12 W 6009553.46 N 552679.26 E 5.032 3841.58
7766.87 90.370 210.590 3907.03 3977.28 579.91 S 3989.91 W 6009510.18 N 552655.80 E 6.941 3880.83
10 November, 2004 - 13:37 Page 2 of 5 Dri/lQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for MPH-16L 1
Your Ref: AP/500292322760
Job No. AKZZ3330703, Surveyed: 29 October, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7812.22 92.720 210.700 3905.80 3976.05 618.91 S 4013.01 W 6009471.01 N 552632.99 E 5.188 3917.80
7857.93 93.330 209.850 3903.39 3973.64 658.33 S 4036.02 W 6009431.42 N 552610.28 E 2.287 3954.86
7910.16 91.360 210.890 3901.25 3971.50 703.35 S 4062.41 W 6009386.20 N 552584.24 E 4.264 3997.27
7957.79 92.960 210.760 3899.46 3969.71 744.22 S 4086.80 W 6009345.14 N 552560.16 E 3.370 4036.18 .
8007.02 93.330 211.060 3896.76 3967.01 786.39 S 4112.05W 6009302.78 N 552535.23 E 0.967 4076.40
8054.26 93.340 209.830 3894.01 3964.26 827.05 S 4135.94 W 6009261.94 N 552511.65 E 2.599 4114.76
8102.94 92.040 213.110 3891.72 3961.97 868.52 S 4161.33 W 6009220.28 N 552486.58 E 7.241 4154.82
8150.36 92.040 217.150 3890.04 3960.29 907.27 S 4188.59 W 6009181.32 N 552459.61 E 8.514 4195.49
8200.99 93.890 221.720 3887.42 3957.67 946.31 S 4220.70 W 6009142.04 N 552427.80 E 9.726 4240.70
8246.64 94.330 224.620 3884.14 3954.39 979.51 S 4251.84 W 6009108.60 N 552396.91 E 6.409 4282.66
8295.47 94.450 228.200 3880.40 3950.65 1013.08 S 4287.10 W 6009074.77 N 552361.91 E 7.314 4328.52
8342.82 93.580 231.920 3877.09 3947.34 1043.39 S 4323.31 W 6009044.18 N 552325.93 E 8.050 4373.93
8391.03 92.220 234.930 3874.65 3944.90 1072.08 S 4361.97 W 6009015.20 N 552287.49 E 6.844 4420.91
8438.57 91.480 237.470 3873.11 3943.36 1098.51 S 4401.45 W 6008988.47 N 552248.21 E 5.562 4467.73
8485.05 92.660 238.110 3871.43 3941.68 1123.27 S 4440.75 W 6008963.41 N 552209.10 E 2.888 4513.70
8534.73 92.960 237.500 3869.00 3939.25 1149.71 S 4482.74 W 6008936.66 N 552167.31 E 1.367 4562.82
8581.26 92.350 237.640 3866.84 3937.09 1174.63 S 4521.97 W 6008911.44 N 552128.27 E 1.345 4608.79
8631.05 90.490 235.480 3865.61 3935.86 1202.068 4563.51 W 6008883.70 N 552086.95 E 5.724 4657.89
8679.40 87.100 234.360 3866.63 3936.88 1229.838 4603.06 W 6008855.62 N 552047.61 E 7.384 4705.32
8727.67 86.970 233.720 3869.12 3939.37 1258.148 4642.08 W 6008827.02 N 552008.80 E 1.351 4752.48
8775.33 86.850 232.930 3871.69 3941.94 1286.57 S 4680.25 W 6008798.30 N 551970.85 E 1.674 4798.91 .
8823.88 86.730 232.240 3874.41 3944.66 1316.028 4718.75 W 6008768.56 N 551932.58 E 1 .440 4846.06
8870.15 87.280 232.020 3876.83 3947.08 1344.388 4755.22 W 6008739.92 N 551896.32 E 1.280 4890.92
8920.74 87.220 229.760 3879.26 3949.51 1376.26 8 4794.43 W 6008707.75 N 551857.35 E 4.464 4939.70
8969.42 88.400 226.730 3881.12 3951.37 1408.658 4830.71 W 6008675.08 N 551821.32 E 6.675 4986.02
9015.23 86.910 223.130 3882.99 3953.24 1441.05 S 4863.03 W 6008642.44 N 551789.24 E 8.499 5028.73
9061.22 87.590 219.700 3885.20 3955.45 1475.49 S 4893.41 W 6008607.76 N 551759.12E 7.595 5070.49
9110.29 89.510 216.030 3886.44 3956.69 1514.21 S 4923.52 W 6008568.82 N 551729.32 E 8.438 5113.74
9159.69 90.620 214.360 3886.38 3956.63 1554.58 8 4951.99 W 6008528.24 N 551701.15 E 4.059 5156.17
9208.69 90.680 211.710 3885.83 3956.08 1595.65 S 4978.70 W 6008486.96 N 551674.76 E 5.409 5197.27
9255.09 89.940 209.340 3885.58 3955.83 1635.61 S 5002.26 W 6008446.82 N 551651.50 E 5.351 5235.06
9304.80 90.190 206.050 3885.52 3955.77 1679.62 S 5025.36 W 6008402.64 N 551628.73 E 6.637 5274.06
9353.63 90.800 202.990 3885.10 3955.35 1724.04 S 5045.62 W 6008358.06 N 551608.81 E 6.390 5310.64
9400.93 90.620 199.600 3884.51 3954.76 1768.10S 5062.80 W 6008313.87 N 551591.97 E 7.177 5344.25
9451.27 91.110 194.600 3883.75 3954.00 1816.208 5077.59 W 6008265.67 N 551577.54 E 9.979 5377.33
10 November, 2004 - 13:37 Page 3 of 5 DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for MPH-16L 1
Your Ref: AP/500292322760
Job No. AKZZ3330703, Surveyed: 29 October, 2004
BPXA
Milne Point Unit
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
9496.94 90.930 194.130 3882.94 3953.19 1860.43 S 5088.92 W 6008221.35 N 551566.55 E 1.102 5405.67
9544.68 91.910 193.900 3881.76 3952.01 1906.74 S 5100.48 W 6008174.96 N 551555.34 E 2.109 5435.06
9591.77 92.350 193.430 3880.01 3950.26 1952.46 S 5111.60 W 6008129.15 N 551544.57 E 1.367 5463.81
9640.58 91.170 192.540 3878.51 3948.76 2000.00 S 5122.56 W 6008081.53 N 551533.97 E 3.028 5493.16 .
9686.94 89.880 191.450 3878.08 3948.33 2045.34 S 5132.19W 6008036.12 N 551524.68 E 3.643 5520.41
9735.96 87.040 191.710 3879.40 3949.65 2093.34 S 5142.03 W 6007988.04 N 551515.21 E 5.818 5548.92
9783.73 84.750 190.860 3882.82 3953.07 2140.07 S 5151.35W 6007941 .25 N 551506.24 E 5.112 5576.44
9846.08 85.120 190.860 3888.32 3958.57 2201.06 S 5163.05 W 6007880.17 N 551495.00 E 0.593 5611.94
9915.00 85.120 190.860 3894.19 3964.44 2268.50 S 5175.99 W 6007812.63 N 551482.58 E 0.000 5651.19 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastin9s are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 246.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 9915.00ft.,
The Bottom Hole Displacement is 5651.28ft., in the Direction of 246.333° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
.
Comment
6106.87
6182.00
9915.00
3990.76
4008.48
3964.44
856.39 N
803.06 N
2268.50 S
3178.87 W
3228.74 W
5175.99 W
Tie On Point
Window Point
Projected Survey
10 November, 2004 - 13:37
Page 4 of 5
DrlllQuest 3.03.06.006
Milne Point Unit
Survey tool program for MPHa 16L 1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
534.00 533.95
To
Measured Vertical
Depth Depth
(ft) (ft)
534.00
9915.00
533.95
3964.44
Halliburton Sperry-Sun
Survey Report for MPH-16L 1
Your Ref: API 500292322760
Job No. AKZZ3330703, Surveyed: 29 October, 2004
BPXA
Survey Tool Description
CB-SS-GYRO (MPH-16PB1)
MWD+IIFR+MS (MPH-16PB1)
.
.
10 November, 2004 . 13:37
Page 5 of 5
DrillQuest 3.03.06.006
·
~1r IÃ\ 1rŒ (ill ~ IÃ\ ~IÃ\ ~
-
AIfASIiA. OIL AND GAS
CONSERVATION COltDlISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Milne Point MPH-16Ll
BP Exploration (Alaska) Inc.
Permit No: 204-191
Surface Location: 2969' NSL, 4003' WEL, SEe. 34, Tl3N, RI0E, UM
Bottomhole Location: 731' NSL, 3904' WEL, SEC. 33, Tl3N, RlOE, UM (OA)
Dear Mr. Archey:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 659- 7 (pager).
S c el ,
BY ORDER 9F THE COMMISSION
DATED thisk day of October, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation wlo encl.
n:, n " " , n
1 a. Type of work DDrill III Redrill rb. Current Well Class D Exploratory III De nYe>ít" '"8':M'ultΡJJêzone
D Re-Entry D Stratigraphic Test D Service D Development GasAIi1~~one
2. Operator Name: 5. Bond: 181 Blanket o Single Well 11. Well Name and Number:
BP Exploration (Alaska) Inc. Bond No. 2S 100302630-277 MPH-16L 1
3. Address: 6. Proposed Depth: 3-1 :3i-" 12. Field / Pool(s):
P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 9910' I TVD _~ Milne Point Unit { Schrader Bluff
4a. Location of Well (Governmental Section): 7. Property Designation: " Þ,r.-Z:ì< v'f
Surface: ADL 025906
2969' NSL, 4003' WEL, SEC. 34, T,13N, R10E, UM 8, Land Use Permit: 13. Approximate Spud Date:
Top of Productive Horizon:
3036' NSL, 2399' WEL, SEC. 33, T13N, R10E, UM (OA) 10107104
Total Depth: 9. Acres in Property: 14. Distance to Nearest Property:
731' NSL, 3904' WEL, SEC. 33, T13N, R10E, UM (OA) 2560 700'
4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation KBE = 15. Distance to Nearest Well Within po~~
Surface: x- 556641 y- 6010120 Zone- ASP4 (Height above GL): 70.5' feet "ex;>' _~away from MPI-03 '1'- 1.- r" .
16. Deviated Wells: Kickoff DePth:i4~000"" feetþp; 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
é' z.~...:)~ Downhole: 2104' Surface: 1970 .
Maximum Hole Angle: 94 d ~ar es
18. çaÒlngprogram: Setting~þth 'i
Size Specifications T ¡p. '.' "" ," .... .' ..'.' Bottom ,(C:.f: v.. ~....~~;
Hole Casina Weiaht Grade CouDlina Lenath MD TVD MD TVD (includina staae data)
6-314" 4-1/2" 12.6# L-80 BTC 3775' 6135' 4010' 9910' 3935' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be compl~tE!dfQl'RedriIIAND,Re-entryOpetäíÌ()O~)
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): I Effective Depth TVD (ft):1 Junk (measured):
9931' 4000' None 9931' 4000' None
Casingi ,'··.·.'···L~I:IQttli ,. Size,'''''''' , i" " "ii;..:. ....'..."." MDi.,·.····..',. ,.···TVD ..
~ I
Condur.tor 112' 20" 260 sx Arctic Set (Approx.) 112' 112'
~ . 2769' 10-3/4" 302 sx PF 'L', 263 sx Class 'G' 2769' 2318'
Production 6488' 7-5/8" 588 sx Class 'G' 6488' 4085'
LinAr 3443' 4-1/2" Uncemented Slotted Liner 9931' 4000'
Perforation Depth MD (ft): IPerfOration Depth TVD (ft):
20. Attachments o Filing Fee, $100 o BOP Sketch 181 Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis
M Property Plat o Diverter Sketch o Seabed Report 181 Drilling Fluid Program 18120 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Walter Quay, 564-4178
Printed Name Pat Archey Title Senior Drilling Engineer
~3a~~ Prepared By Name/Number:
Signature PhoneÇø(¡-S-0~ S Date '1 /?~/oc¡ Sondra Stewman, 564-4750
....,......."l , .... .i '.
."'. ... , ........
Permit To Drill. )tj,'1' IAPI Number: ø1 23¿27~c:'ó Permit APpr~~, It. I ~ee cover letter for
Number: 2-D -I I 50- 0.- , Date: Jt) V c¡ </ other requirements
Conditions of Approval: Samples Required DYes ~'No Mud Log Required DYes gNo
Hydrogen Sulfide Measures DYes iXNo Directional Survey Required "þš'fYes No
Other: ~O c)\ ~ \> ·~S \- 0.,"> 'X \O-~" ~lO \=>\t:S~ ,,, ~ ~ \ L.. \ ~2J~'{ <>.
-
AoDroved 80 YÂ n R I h I f\Lð , APPROVED BY 'ðfi!ðtf v /
THE COMMISSION Date
Form 10-401 RëV;sed &64 ~ . - . . . - Suf>mit In Duplicate
. STATE OF ALASKA I
ALASKA ð'Ir AND GAS CONSERVATION COM ISSION
PERMIT TO DRILL
20 AAC 25 005
hol?
RECEIVED
SEP 2 4 2004
oj
~
.
.
IWell Name: IMPH-16L-1
Drill and Complete Plan Summary
MPH-16 Well Program
I Type of Well (service I producer I injector): I Schrader Bluff Multi-Lateral Producer
Surface Location: 2,969' FSL, 4,003' FEL, SEC. 34, T13N, R10E
(As Built) E=556641 N=6010120
Target Location: 3756' FSL, 1952' FEL, SEC. 33, T13N,R10E
Top 08 E=553405 N=6010884 Z= 3965' TVD SS
Target Location: 731'FSL,390~FEL,SEC.33,T13N,R10E
8HL 08 Well TD E=551482 N=6007845 Z=3930' rvD SS
Target Location: 3036' FSL, 2399' FEL, SEC. 33 , T13N, R10E
Top OA E=552965 N=6010161 Z= 3940' TVD SS
Target Location: 731' FSL, 3904' FEL, SEC. 33, T13N, R10E
BHL OA Well TD E=551482 N=6007845 Z=3865' TVD SS
Distance to Property line 700'
Distance to nearest pool 3701' from MPi-03
7
.
Mud Program:
13-1/2" Surface Hole 0 - 4250' :
Densit PV YP API FL
8.6 - 9.4 10 - 25 30-50 NC-8
9-7/8" Intermediate Hole 4240' - 5728' :
Densit PV YP API FL
9.5 8 - 15 26 - 32 6 - 8
9-7/8" Intermediate Hole 5728' - 6488' :
Densit PV YP API FL
10.5 8 - 15 26 - 32 6 - 8
6-3/4" OB Production Hole 6488'-- 9931' :
Density (ppg PV YP HTHP
10.5
.
MPH-16 Well PrOQram
LSND
H
8.5 -9.5
LSND
H Chlorides
9.0 - 9.5 < 1500
LSND
H Chlorides
9.0 - 9.5 < 1500
MBT
<25
MBT
< 25
MOBM
Electrical
Stabili
550 - 900
MOBM
Electrical
Stabilit
550 - 900 ,/
15-bbl water
........
'"^1n:~ 1~-""2&""
6-3/4" OA Production Hole 6135-- 9910' :
Density (ppg PV YP HTHP Oil:Water
Ratio
80:20
15 -26 20 - 22 < 8
-- ~
--.-- ~
LCM Re C IOns: Yes. Use CaC03 as LCM
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D5-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU IR.
Cement Pro ram:
Casin Size 10-3/4"45.5 Ibltt L-80 BTC Surface Casin
Lead Slurry to surface. Excess 150% over gauge hole.
To of tail cement 1000' MD above casin shoe.
Basis
Total Cement
Volume: 294 bbl Wash
S acer
Lead
Tail
Tern
Casin Size 7-5/8" 29.7lb/ft L-80 BTC-M Intermediate Casin
Basis Top of tail slurry 500' MD above TUZC. 40% excess over
Total Cement
Volume: 122 bbl Wash 25-bbl water
S acer
Tail
Tern
8
.
.
MPH-16 Well Proaram
E
r
p
va ua Ion rogram:
13-1/2" Section
Open Hole: MWD/GR Photo Gryo
IFR/CASANDRA Sperry InSite
Cased Hole: N/A
9-7/8" Section
Open Hole: MWD/GR/RES
IFR/CASANDRA Sperry InSite
Cased Hole: N/A
6-3/4" Section
Open Hole: MWD/GR/RES/ABI ,
IFR/CASANDRA Sperry InSite
Cased Hole: N/A
Formation Markers:
Formation Tops MDrkb iTVDrkb (ft) Pore Pressure Estimated EMW
(ft) (psi) (lb/gal)*
BPRF 1894 1820 759 8.35
TUZC 4780 3448 1466 8.35
UQnu-MA 5226 3667 1561 8.35
Ugnu-MB1 5249 3677 1566 8.35
Ugnu-MB2 5153 3632 1585 8.35
UQnu-MC 5646 3844 1638 8.35
SBF2-NA 5728 3875 2037 ~10.3
SBF1-NB 5823 3908 2055 \. 10.3
SBE4-NC 5902 3935 2069 \ 10.3
SBE2-NE 5957 3954 2079 / 10.3
SBE1-NF 6093 3999 2103 \ 10.3
TSBD-Top OA 6212 4031 1595 \ 7.75
TSBC-Base OA 6304 4053 1604 7.75
TSBB-Top OB 6459 4081 1616 7.75
SBA5-Base OB 6606 4101 1624 7.75
"
9
.
.
Casin ITubin
Hole Size Csg /
Tb O.D.
20-in*
10.75-in
7.625-in
4.5-in
·-SJottß<:t.. .
4.5-in
Slotted
MPH-16 Well Program
Grade Conn Length Top Bottom
MD / TVDrkb MD / TVDrkb
92# H-40 Welded 112' 0' 112' / 112'
45.5# L-80 BTC-M 4,250' 0' 2,769' / 2,318'
29.7# L-80 BTC-M 6,488' 0' 6,488 / 4,085'
12.6# L-80 BTC 3,443' 6,488/ 4,085' 9,931 '/4,000'
12.6# L-8 --··BIC....... ___Ârl '
42-in
13.5-in
9.875-in
6.75-in
~
Recommended Bit Program:
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate
1 13.5" 0' - 4,250' Hughes MXC1
2 9.875" 4,250 - 6,488' Smith XR+iVC
3(OB) 6.75" 6,488' -9,931' Hycalog DS 146
4(OA) 6.75" 6,135 ' -9,910' Hycalog DS 146
10
.
.
MPH-16 Well Program
Well Control:
Intermediate/Production hole: .1
· Maximum anticipated BHP: 2,1 04-psi @ 3,928-ft TVDrkb - SBE1-NF
· Maximum surface pressure: 1,970 psi @ surface...,
(Based on BHP and a f411-c'Õ1)1mn of gasfrom'fD@ O.l-psi/ft)
· Planned BOP test pressure: 3,000-psi. For this well a roval is sou ht to chan e the BOP
testin interval from 7 to 1
An FIT to 12.5-lb/gal at the 1O··3/4"shoe.
52-bbl with 1O.8-lb/gal mud.
MOBM in Weill/Laterals
"...>O.·,·<·'.."·.nij."..,._..y,<......
· Integrity test:
Kick tolerance:
· Planned completion fluid:
Drilling Hazards & Contingencies:
· Hydrates have been encountered on H-Pad wells, but are not expected to be a major problem.
Lost Circulation
../~.Wedo notexpE3~~t losse~ while drilling this well.
CExpected Pressures
.......... On 2002 dri/lilÎg, 'IJOSSible over-pressure was encountered in drilling H-13A Gas cut mud and oil
. ..atthe shakers, requiring 9.8 ppg mud was encountered in the Schrader Bluff. The planned MW
- ..... in this Schrader Bluff interval is > 10.3 ppg and should take care of this issue. ./
Pad Data Sheet
· Please Read the I-Pad Data Sheet thoroughly.
Breathing
· Not expected or predicted.
Hydrocarbons
· Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff.
Faults
· Three fault intersections are prognosed for this well. These are in the SV (-3,169' MD), the MB1
5,270' MD), OA (8,000' MD) and in the OB & OA Laterals (-8,700' MD).
Hydrogen Sulfide
· MPH Pad is not designated as an H2S Pad. I-Pad wells <2-ppm H2S reported. Latest samplings:
o MPH-07 <2 6/27/04 "
o MPH-09 <2 6/27/04
o MPH-13A <2 6/27/04
Anti-collision Issues
· MPH-16 passes the Major Risk Criteria. The closest issue is MPI-13 at 700' with a 30' center to
center distance.
Distance to Nearest Property
· MPH-16 is 700 ft from the nearest Milne Point property line.
Distance to Nearest Well Within Pool
· MPH-16 is 600' from the Schrader Bluff sand penetration in MPI-03.
11
.
.
MPH-16 Well Program
DRILL & COMPLETION PROCEDURE
Pre-Rig Operations
1. The 20" conductor is installed.
2. NU Diverter
Drill i na
\'
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
MIRU Doyon 14, ND Tree/NU BOP.
Function Test Diverter, PU 4" DP.
Drill 13.5" surface hole.
Run and cement 10.75" surface casing.
ND diverter, install wellhead and NU/Test BOP.
Drill 9.875" intermediate hole.
Run and cement 7-5/8" intermediate casing.
Displace to MOBM. Drill 6-314" OB horizontal production hole. ~
Run 4.5" slotted liner.
Run-wmpstOck and mill window for OA~eral.
Drill 6-3/4" OA horizontal production hole.
Retrieve whipstock.
Run 4.5" slotted liner and hang off in 7.625" casing
RU and Run 2.875" ESP Completion.
ND BOP/NU Tree
Freeze Protect With Diesel.
RDMO Doyon 14.
-------
-----
\h~Gff~ \
12
MPH-16 Proposed
TREE: 2-9/16" 5M
WELLHEAD: FMC Gen 5 System 11", 5M
Tubing Head: FMC 11" X 2.875"
Baker ZXP Liner Top Packer &
HMC Hanger @ -6,250' MO
I 112'
Cameo 2 7/8" x 1" sidepoeket KBMM GLM -200'
2-7/8" 6.5 ppf, L-80, EUE production tubing
(Drift ID = 2.347", cap = 0.00579 bpf)
Camco 2 7/8" x 1" side pocket KBMM GLM -2000'
10-3/4",45.5# L-BO BTC Csg
Casing 109.950"
Casing Drift 9.794"
Cameo 2 7/8" x 1" sidepoeket KBMM GLM 2 Jts above ESP
27/8" XN Nipple. 1 Jt above ESP
Centrilift ESP
Baker Hookwall Hanger
Window in 7-5/8" casing@ 6,135' M
Well Inclination @ Window:: 74°
\--\ ? Yr-\ G L ~.. OA C.~ecal
I 6.135'-9910' I /
3775'
---...------
--------
"~.-- ~---
7-5/8", 29.7#, L-80, BTC-M
Casing Drift: 6.75" 6-3/4" OB Lateral
Casing ID: 6.875" I I
6,488'-9,931' I
3443"
¡
17-5/8" Casing Shoe @ 6,488' MO I
-----------
----------
DATE
REV. BY
09/132004
W. Quay
COMMENTS
Proposed Multi-lateral
Milne Point
WELL: MPH-16
API NO: 50-029--
50-029-
50-029-
,
I
I
I
l______ _____ ________________________,
I
I
I
I
I
I
I
,
I
I
I
I
I
I
,
,
I
I
I
I
I
I
I
I
\
\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,
I
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
----- - ----- -- ----------./)
1S'4{'59"
~
" z
'i!! :5
o a.
-~-
I
H-14.
H-13.
I H-12.
I H-11 ·
H-10.
H-9.
I
-$- H-1B
-$- H-17
1 -$- H-16
Å H-15
30'(TYP)T
T · H-4
· H-5
· H-3
· H-6
· H-2
· H-8
· H-1
· H-7
MPU H-PAD
~
1. OA TE OF SURVEY: JULY 24, 2004.
2. REFERENCE FIELD BOOK MP04-02 pp.17-21.
1. ALASKA STATE PLANE COORDINATES
(A.s.P.) ARE ZONE 4 ALASKA. NAD 27.
2. PAD SCALE FACTOR IS 0.99990364
3. HORIZONTAL CONTROL IS BASED ON
MPU H-PAD MONUMENTS H-1 AND H-2
VICINITY MAP
N.T.S.
LEGEND
-$- AS-BUILT WELL CONDUCTOR
. EXISTING WELL CONDUCTOR
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERL Y REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF JULY 24, 2004.
LOCATED WITHIN PROTRACTED SECTION 34, T. 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS
H-15 y= 6,010,091.32 N= 1,409.85 70"26'17.584" 70.4382178" 358 2,940' FSL
X= 556,633.05 E= 879.91 149'32'17.602" 149.5382228' . 4,011' FEL
H-16 y= 6,010,120.38 N= 1,440.03 70"26'17.869" 70.4382969' 362 2,969' FSL
X= 556,641.19 E= 879.89 149'32'17.356" 149.5381544' . 4,003' FEL
H-17 y= 6,010,149.22 N= 1,470.03 70"26'18.153" 70.4383758" 57 2,997' FSL
X= 556,649.44 E= 880.04 149"32'17.108" 149.5380856" 3 . 3,995' FEL
H-18 Y= 6,010,178.19 N= 1,500.11 70'26'18.437" 70.4384547" 356 3,026' FSL
X= 556,657.51 E= 879.97 149'32'16.865" 149.5380181" . 3,986' FEL
F. Robert DRAWN:
HACKLEMAN
linill CHECKED: bp SP EXPLORATION
JACOBS
DATE:
7-27-04
DRAWING: SHEET:
FRB04 MPH 01-00 MILNE POINT UNIT H-PAD
~ rIJ~g)illœo JOB NO:
SCALE: AS-BUlL T CONDUCTORS
K'IoH JJ ~Œf!S"""lANDSUR'o£roRS WELLS MP H-15, H-16. H-17. H-18 1 or 1
IIC1I'WEST FIft€YIEID lAHE 1- = 150'
BY CHK NIOIORAOC. AU\Sl(A ~!>03
o 7-27-0 ISSUED FOR INFORMATION
NO. Oil TE REVISION
COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM Plan; MPH·6 L1 WP02 (Plan Neo (MPH-16 )/MPH-16 LI)
()I,p SP Amoco Co-ordinale (NÆ) Reference: WeltCcntre: Plan Neo( MPH-16), True North Deplh Fm Depth To SurveylPlan Tool Created By: Troy Jakabosky Dale: 8/1112004
VI:rtiCII\ (TYD) Refe~nce: )·U+)6,2 70.50
Calculation MetOOd.: Minimum Curvature Section (VS) Reference: SIoI - (O.OON.O.OOE) 6135.00 99!1J.38 Planned: MPH-16 L( WPa2 Vl6 MWl).!-IFR+MS Checked: Date
Error System: IseWSA Measu~~kth~e~=~ tJi~t;~;~ Cu~~;o
Scan Method: Trav ~yljnder ~nh
Error Surface: Elliptical + Ca.'"ng Reviewed: Dale:_
Warning Method: Rules BB~
WELL DETAILS
FORMATION TOP DETAILS CASING DETAILS N~ +Ni-S +EI-W North~ -"" Latitud: Longitude Slol
No. TVDPath MDPath Forrnatìon No. TVD MD Name Size Plan Nco (MPH-J6) 1139.36 1244.90 6010120.38 556641.19 70"26'17.87ON 149°)2'17JS6W NiA
4030.50 6234.98 TSBD-Top OA 3935.49 9909.80 4 1/2" 4.500 SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target
I 6135.00 74.16 225.04 4010.49 853.79 -3164.97 0.00 0.00 2566.87
2 6155.00 76.08 223.55 4015.62 839.95 -3178.47 12.00 -37.00 2584.75
TARGET DETAILS 3 635 I. 70 91.90 211.76 4036.22 685.68 -3297.16 10.00 -37.35 2754.89
4 6981.62 91.90 211.76 4015.30 150.40 -3628.58 0.00 0.00 3271.41
Name TVD +N/-S +E/-W Northing Easting Shape 5 7076.42 93.91 208.54 4010.50 68.55 ·3676.13 4.00 -58.05 3347.52 MPH·16LI MidOA TI
6 7077.00 93.91 208.56 4010.46 68.04 ·3676.41 4.00 84.75 3347.97
MPH-16 Fault I 2642.50 1407.66 -772.60 60 I 1522.00 555858.00 Polygon 7 7781.42 93.91 208.56 3962.46 -549.20 -4012.42 0.00 0.00 3901.22
MPH-16 Fault 2 3686.50 1884.43 -2708.22 6011984.00 553919.00 Polygon 8 7810.55 93.80 207.40 3960.50 -574.87 -4026.06 4.00 -95.25 3923.92 MPH-16 LI Mid OA T2
MPH-16 LI Mid OA T3 3930.50 -1067.44 -4354.84 6009020.00 552295.00 Point 9 7855.64 93.68 209.20 3957.56 -614.49 ·4047.39 4.00 93.74 3959.21
MPH-16 LI Mid OA T5 3935.50 -2236.34 -5176.82 6007845.00 551482.00 Point 10 8143.75 93.68 209.20 3939.06 -865.45 -4187.67 0.00 0.00 4187.52
MPH-16LI MidOA T4 3950.50 -1403.78 -4842.46 6008680.00 551810.00 Point II 8407.56 90.00 230.00 3930.50 -1067.44 -4354.84 8.00 99.59 4421.08 MPH-16 LI Mid OA T3
MPH·16 Fault 5 3957.50 -7.25 -5283.91 6010073.00 551358.00 Polygon 12 8510.51 87.51 237.85 3932.74 -1127.99 -4437.95 8.00 107.63 4521.39
MPH-16 L1 Mid OA T2 3960.50 -574.87 -4026.06 6009515.00 552620.00 Point 13 8837.87 87.51 237.85 3946.94 ·1302.01 -4714.87 0.00 0.00 4844.61
MPH-16 Fault 6 3979.50 -1852.15 -4668.84 6008233.00 551987.00 Polygon 14 9001.47 90.00 225.00 3950.50 -1403.78 -4842.46 8.00 ·79.24 5002.09 MPH·16 LI Mid OA T4
MPH-16 Fault 4 3996.50 -911.17 -5045.74 6009171.00 551603.00 Polygon 15 9361.54 91.17 196.22 3946.73 ·1710.41 ·5023.87 8.00 -87.56 5290.23
MPH-16 L1 Mid OA TI 4010.50 68.55 -3676. I 3 6010161.00 552965.00 Point 16 9909.38 91.l7 196.22 3935.50 ·2236.34 ·5 I 76.82 0.00 0.00 5639.2 I MPH·16LI MidOA T5
MPH-16 Fault 3 4034.50 1254.94 -3445.09 6011349.00 553187.00 Polygon
MPH-16 Geo Poly 4035.50 787.94 -3230.90 6010883.68 553404.71 Polygon
i ..
320 ! . :.
=
~
0
0 ,
:!.
"" 360
ë.
2)
"§
€ ...
~
>
~ ..."""
2
¡...
"
. ,.... ......
400 0 ' ,
2400
or D~ 1~/IÒO'~6íJ5; ~!).~()¡O. 9'fv6
: :: \ : ! i ;! ::
, .
'C--
····f~~4.;¡;4·+7~;: 2;M·3~¥~itD!::fl i
/il"'t'l IIII'JIII 'i'fj'¡' IIJ
'/1 ' $aiD¡f: 855!fffn:j;J'5~5~TYDI11"-1 . - :-+11'¡- T 11
f --r ·r;,isJI~?;;Þ;fÖr811~~I··;;·~;;·lj9¡,;t6' VP!I:'.'. 11!.:lr ,t r I t
, ¡'li1T'¡"¡'I"ËriðDir-:8sïo: r"~I';~932:1~'M'!-- ". I f 11.
l:I.1 j:IJHj,=t:Ü-lti~t~í~;t"j~~JtJ#
¡ r ¡I! '\ " l i i +
.---¡
i.
I if
/
i I / !
I; I
'I
rc," I
1>'
'"
/1
.
.,
2800
--
I
I
E1<1 'i, :
1
I..
I I "
,
II I··
j !
.~
---
, 'I' I
+:--!T¡--j- --I
j~¡H1161-- wpot::t
-i"J-+ft--L+1
p:t+:~'iiÎ":¡:-l'f
?~1;Lll~t
__ _n__
II
I
"
--
--
---
---
,-.---.- ----
-- --
-"
--
--
-----
---
--.-
l -r-
....-" _.-"'-~-' I I ¡
\--
'.-r--
1--lllT-I: .-:If . ---
roiifòJ¡¡¡]<¡1 09138 Mtd<)~5Jr ro
ìT1T·¡-.:-r'lil--
--t--
:---¡--1
------
T
.
,
3200
3600
4000
4400
4800
5200
5600
Vertical Section at 246.640 [400ft/in]
COMPANY DETAILS
Bf' Amoco
OhP Ca}culation Melhod: Minimum Curvature
.. Error System: IseWSA
Scan Method: Trav Cylinder North
ErTOt Surface: EUiplic.a1 + Casing
Warning Medni: Rules Based
-
FORMA T10N TOP DETAILS
No. TVDPalh MDPath Formation
1 4030.50 6234.98 TSBD- Top OA
REfERENCE INFORMATION SURVEY PROORAM Plan: MPH~16 Ll WPß2 (Plan Neo( MPH·16 )/MPH·6 LI
e~rdinafe (N/E) Reference: Well Centre: Platl Neo (Mf>H~16 \, True Notth I Depth Fm Depth To SurveylPlan Tool Crtated By. Troy Jakabosky Dlte: 8/1112004
Vertícal ¡rvb) Reference: 343+36.270.50
Sð;tion (VS) Reference: Slot· (OJX}N,Q,OOE) 6]35,00 9909j' Planned: MPH·]6 LI wP02 VI6 MWD+IFR+MS ~ WELL DETAILS
MeuU~a~;lh~~~::; ~¡~~~curv:::eo +N/·S +Ef-W -. ....... ...- ......'- SI,
Neo (MPH~16) 113936 1244.90 6010120J 556641.19 70"26'IU70N 149"'32'17.J56W NI.
I 6135.00
2 6155.00
3 6351.70
4 6981.62
III 5 7076.42
'I 6 7077.00
I I 7 7781.42
I I i 8 7810.55
I i I' 9 7855.64
I I 10 8143.75
I I I II 8407.56
. J.. I , ... 12 8510.51
- M[l'li-16 ",au1t 13 8837.87
14 9001.47
15 9361.54
16 9909.38
i I
I I I I
-4-LL1 I . ' I I 'I I ' . I ,',I
tH-' i IS*rtD~ I~/\O : Þlf5,'IMþ,¡4~1014~T,V
I ~ I · I I b I I I ' : ¡ i I [,
~ i tartbi¡I~!I,0:~155'M~.'05.52fr D
IN I 'I Ilil:111
i , i End Pj, : 615~. MDI403~.2:Hvb 1
i i II ¡ - I : I ¡ I \ ¡ ! i ~, j !
1 , , i I I I I I I I I ' 'I I I
I, I ! , I : 1 j I I I I "
-r 51 'rt Pi\ 4110P'1618 .6f M~. 4f!15.3;TYI>¡
-1 I I " I: ~I I:
i E/1d¡DiT+7077'MU¡4 1?.46'1
It itil! 1, J L:
4/109':¡7frli4~"fD 3f6, .4~·1\V¡
15IM'MDI, 3951.56'1:VD
¡II ¡'I' ' i·,'1 i
I I I I I,'
II II 1"1'1 I
I I 'I : I
'15' t-1*.$9~9.06·!r\fD,
'---1--1-/ _ i__L
-;
$tah_~~;
, " 'I I E~d Di¡ :171
6hMi:dQA!T2 .l-f+t'! i .,!¡
I ¡ i \i ¡ i '. .ii
I I Sfi¡tt'D(r ~!lOO ¡: 81<
Tiil ! ,,','
SECTION DETAILS
Ine Azi TVD +N/-S +E/-W DLeg TF ace VSee Target
74.16 225.04 4010.49 853.79 -3164.97 0.00 0.00 2566.87
76.08 223.55 4015.62 839.95 ·3178.47 12.00 -37.00 2584.75
91.90 211.76 4036.22 685.68 -3297.16 10.00 -37.35 2754.89
91.90 211.76 4015.30 150.40 -3628.58 0.00 0.00 3271.41
93.91 208.54 4010.50 68.55 -3676. I 3 4.00 -58.05 3347.52 MPH-16 Ll Mid OA T1
93.91 208.56 4010.46 68.04 -3676.41 4.00 84.75 3347.97
93.91 208.56 3962.46 -549.20 -4012.42 0.00 0.00 3901.22
93.80 207.40 3960.50 -574.87 -4026.06 4.00 -95.25 3923.92 MPH-16 Ll Mid OA T2
93.68 209.20 3957.56 -614.49 -4047.39 4.00 93.74 3959.21
93.68 209.20 3939.06 -865.45 -4187.67 0.00 0.00 4187.52
90.00 230.00 3930.50 -1067.44 -4354.84 8.00 99.59 4421.08 MPH-16 LI MidOA 13
87.51 237.85 3932.74 -1127.99 -4437.95 8.00 107.63 4521.39
87.51 237.85 3946.94 -1302.01 -4714.87 0.00 0.00 4844.61
90.00 225.00 3950.50 -1403.78 -4842.46 8.00 -79.24 5002.09 MPH-16 Ll Mid OA T4
91.17 196.22 3946.73 -1710.41 -5023.87 8.00 -87.56 5290.23
91.17 196.22 3935.50 -2236.34 -5176.82 0.00 0.00 5639.21 MPH-16 LI Mid OA T5
MD
See
Size
4.500
CASING DETAILS
No. TVD MD Name
I 3935.49 9909.80 41/2"
i
i
!
!
TARGET DETAILS
Name TVD +N/-S +EJ-W Northing Easting Shape
MPH-16 Fault 1 2642.50 1407.66 -772.60 60 II 522.00 555858.00 PQlygßn
MPH- 16 Fault 2 3686.50 1884.43 -2708.22 6011984.00 553919.00 Polygon
MPH-16LI MidOA T3 3930.50 -1067.44 -4354.84 6009020.00 552295.00 Point
MPH-16 LI Mid OA IS 3935.50 -2236.34 -5176.82 6007845.00 551482.00 Point
MPH-16 LI Mid OA T4 3950.50 -1403.78 -4842.46 6008680.00 551810.00 Point
MPH-16 Fault 5 3957.50 -7.25 -5283.9\ 6010073.00 551358.00 Polygon
MPH-16 LI Mid OA 1'2 3960.50 -574.87 -4026.06 6009515.00 552620.00 Point
MPH- \ 6 Fault 6 3979.50 -1852.15 -4668.84 6008233.00 551987.00 Polygon
MPH-16 Fault 4 3996.50 -9\ 1.\1 -5045.74 6009171.00 551603.00 Polygon
MPH·16 LI Mid OA II 4010.50 68.55 -3676.13 6010161.00 552965.00 Point
MPH-16 Fault 3 4034.50 1254.94 -3445.09 6011349.00 553187.00 Polygon
MPH-16 Goo PoLy 4035.50 787.94 -3230.90 6010883.68 553404.71 Polygon
,
i
-
6
Mh¡\.li. ~ßuit 5
I
i
I
I
MP1
,
!
!
u-
i
I
I
so.
90
I
c
~
8
~
~
t:
o
i
o
'"
ý
~~I
-900
1800
-2700
3!
nµ 9ir! ;~5 N.? I 'MP, ¡39
1-- i--i-- \-l <I "'~
¡i 8Alob':i8s3is1'?lm'.
lILim!i' i.
¡-\--I -I
611.5h·a~.
¡ , \ !
I
: ! j- , : -)
-liJt~l~p~hJ9
N ~pk;r6 b
:Jp~-I~LM¡',~
, , , ! ~
-3600
West(-)IEast(+) [900ft/in]
I ;
3~46. 73
<I
"¥
-4500
./
ff\
:.-r
( t
i
I
¡
-5400
\ \
4illf"
,
-90
80
-270.
.
.
BP
BP Planning Report
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: M pt H Pad
TR-13-10
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
6008971.91 ft
555404.91 ft
Latitude: 70 26
Longitude: 149 32
North Reference:
Grid Convergence:
6.665 N
53.895 W
True
0.43 deg
Well:
Plan Neo ( MPH-16 )
Slot Name:
Well Position: +N/-S 1139.36 ft Northing: 6010120.38 ft
+E/-W 1244.90 ft Easting: 556641.19 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 26 17.870 N
149 32 17.356 W
Casing Points
0.00 SBF2-NA 0.00 0.00
0.00 SBF1-NB 0.00 0.00
0.00 SBE4-NC 0.00 0.00
0.00 SBE2-NE 0.00 0.00
0.00 SBE1-NF 0.00 0.00
6234.98 4030.50 TSBD-Top OA 0.00 0.00
0.00 TSBC-Base OA 0.00 0.00
0.00 TSBB-Top 08 0.00 0.00
0.00 S8A5-Base 08 0.00 0.00
MPH-16 Fault 1 2642.50 1407.66 -772.60 6011522.00 555858.00 70 26 31.713 N 149 32 40.037 W
-Polygon 1 2642.50 1407.66 -772.60 6011522.00 555858.00 70 2631.713N 149 32 40.037 W
-Polygon 2 2642.50 913.25 -858.36 6011027.00 555776.00 70 26 26.851 N 149 32 42.553 W
-Polygon 3 2642.50 222.15 -1119.64 6010334.00 555520.00 70 26 20.054 N 149 32 50.220 W
-Polygon 4 2642.50 913.25 -858.36 6011027.00 555776.00 70 26 26.851 N 149 32 42.553 W
MPH-16 Fault 2 3686.50 1884.43 -2708.22 6011984.00 553919.00 70 26 36.398 N 149 33 36.865 W
-Polygon 1 3686.50 1884.43 -2708.22 6011984.00 553919.00 70 26 36.398 N 149 33 36.865 W
-Polygon 2 3686.50 1347.20 -2555.28 6011448.00 554076.00 70 2631.115 N 149 33 32.369 W
-Polygon 3 3686.50 832.28 -2180.14 6010936.00 554455.00 70 26 26.052 N 149 33 21.352 W
-Polygon 4 3686.50 1347.20 -2555.28 6011448.00 554076.00 70 2631.115 N 149 33 32.369 W
MPH-16 L 1 Mid OA T3 3930.50 -1067.44 -4354.84 6009020.00 552295.00 70 26 7.359 N 149 34 25.156 W
MPH-16 L 1 Mid OA T5 3935.50 -2236.34 -5176.82 6007845.00 551482.00 70 25 55.858 N 149 34 49.255 W
MPH-16 L1 Mid OA T4 3950.50 -1403.78 -4842.46 6008680.00 551810.00 70 26 4.048 N 149 34 39.460 W
.
.
BP
BP Planning Report
MPH-16 Fault 5 3957.50 -7.25 -5283.91 6010073.00 551358.00 70 26 17.780 N 149 34 52.443 W
-Polygon 1 3957.50 -7.25 -5283.91 6010073.00 551358.00 70 26 17.780 N 149 34 52.443 W
-Polygon 2 3957.50 1088.10 -3731.39 6011180.00 552902.00 70 26 28.562 N 149 34 6.892 W
MPH-16 L 1 Mid OA T2 3960.50 -574.87 -4026.06 6009515.00 552620.00 70 26 12.205 N 149 34 15.515 W
MPH-16 Fault 6 3979.50 -1852.15 -4668.84 6008233.00 551987.00 70 25 59.640 N 149 34 34.357 W
-Polygon 1 3979.50 -1852.15 -4668.84 6008233.00 551987.00 70 25 59.640 N 149 34 34.357 W
-Polygon 2 3979.50 -2968.50 -4904.35 6007115.00 551760.00 70 25 48.659 N 149 34 41.246 W
MPH-16 Fault 4 3996.50 -911.17 -5045.74 6009171.00 551603.00 70 26 8.892 N 149 34 45.435 W
-Polygon 1 3996.50 -911.17 -5045.74 6009171.00 551603.00 70 26 8.892 N 149 34 45.435 W
-Polygon 2 3996.50 -1223.64 -4594.06 6008862.00 552057.00 70 26 5.821 N 149 34 32.174 W
-Polygon 3 3996.50 -2085.76 -3802.51 6008006.00 552855.00 70 25 57.347 N 149 34 8.932 W
-Polygon 4 3996.50 -1223.64 -4594.06 6008862.00 552057.00 70 26 5.821 N 149 34 32.174 W
MPH-16 L 1 Mid OA T1 4010.50 68.55 -3676.13 6010161.00 552965.00 70 26 18.535 N 149 34 5.255 W
MPH-16 Fault 3 4034.50 1254.94 -3445.09 6011349.00 553187.00 70 26 30.204 N 149 33 58.490 W
-Polygon 1 4034.50 1254.94 -3445.09 6011349.00 553187.00 70 26 30.204 N 149 33 58.490 W
-Polygon 2 4034.50 931.04 -3068.50 6011028.00 553566.00 70 26 27.020 N 149 33 47.431 W
-Polygon 3 4034.50 497.60 -2622.74 6010598.00 554015.00 70 26 22.759 N 149 33 34.341 W
-Polygon 4 4034.50 931.04 -3068.50 6011028.00 553566.00 70 26 27.020 N 149 33 47.431 W
MPH-16 Geo Poly 4035.50 787.94 -3230.90 6010883.68 553404.71 70 26 25.612 N 149 33 52.196 W
-Polygon 1 4035.50 956.36 -3110.02 6011053.00 553524.30 70 26 27.269 N 149 3348.650 W
-Polygon 2 4035.50 1054.99 -3322.79 6011150.00 553310.80 70 26 28.238 N 149 33 54.897 W
-Polygon 3 4035.50 550.93 -3718.17 6010643.00 552919.30 70 26 23.279 N 149 34 6.496 W
-Polygon 4 4035.50 -698.42 -4350.54 6009389.00 552296.50 70 26 10.988 N 149 34 25.036 W
-Polygon 5 4035.50 -1315.79 -5102.62 6008766.00 551549.20 70 26 4.912 N 149 34 47.096 W
-Polygon 6 4035.50 -2469.03 -5485.03 6007610.00 551175.60 70 25 53.567 N 149 34 58.293 W
-Polygon 7 4035.50 -2472.75 -4995.70 6007610.00 551664.90 70 25 53.534 N 149 34 43.935 W
-Polygon 8 4035.50 -1586.19 -4659.72 6008499.00 551994.10 70 26 2.255 N 149 34 34.094 W
-Polygon 9 4035.50 -1075.22 -3988.56 . 6009015.00 552661.30 70 26 7.284 N 149 34 14.407 W
-Polygon 10 4035.50 866.21 -2959.48 6010964.00 553675.50 70 26 26.383 N 149 33 44.230 W
Plan Section Information
6135.00 74.16 225.04 4010.49 853.79 -3164.97 0.00 0.00 0.00 0.00
6155.00 76.08 223.55 4015.62 839.95 -3178.47 12.00 9.61 -7.44 -37.00
6351.70 91.90 211.76 4036.22 685.68 -3297.16 10.00 8.04 -5.99 -37.35
6981.62 91.90 211.76 4015.30 1 50.40 -3628.58 0.00 0.00 0.00 0.00
7076.42 93.91 208.54 4010.50 68.55 -3676.13 4.00 2.11 -3.40 -58.05 MPH-16 L 1 Mid OA T1
7077.00 93.91 208.56 4010.46 68.04 -3676.41 4.00 0.37 3.99 84.75
7781.42 93.91 208.56 3962.46 -549.20 -4012.42 0.00 0.00 0.00 0.00
7810.55 93.80 207.40 3960.50 -574.87 -4026.06 4.00 -0.37 -3.99 -95.25 MPH-16 L 1 Mid OA T2
7855.64 93.68 209.20 3957.56 -614.49 -4047.39 4.00 -0.27 4.00 93.74
8143.75 93.68 209.20 3939.06 -865.45 -4187.67 0.00 0.00 0.00 0.00
8407.56 90.00 230.00 3930.50 -1067.44 -4354.84 8.00 -1.40 7.88 99.59 MPH-16 L 1 Mid OA T3
8510.51 87.51 237.85 3932.74 -1127.99 -4437. 95 8.00 -2.42 7.63 107.63
8837.87 87.51 237.85 3946.94 -1302.01 -4714.87 0.00 0.00 0.00 0.00
9001.47 90.00 225.00 3950.50 -1403.78 -4842.46 8.00 1.52 -7.86 -79.24 MPH-16 L1 Mid OA T4
9361.54 91.17 196.22 3946.73 -1710.41 -5023.87 8.00 0.33 -7.99 -87.56
9909.38 91.17 196.22 3935.50 -2236.34 -5176.82 0.00 0.00 0.00 0.00 MPH-16 L 1 Mid OA T5
.
.
BP
BP Planning Report
6135.00 74.16 225.04 4010.49 3939.99 853.79 -3164.97 0.00 6010950.02 553470.13 Start Dir 12/10
6150.00 75.60 223.92 4014.40 3943.90 843.45 -3175.11 12.00 6010939.61 553460.07 MWD+IFR+MS
6155.00 76.08 223.55 4015.62 3945.12 839.95 -3178.47 12.00 6010936.09 553456.74 Start Dir 10/10
6175.00 77.67 222.31 4020.16 3949.66 825.69 -3191.73 10.00 6010921.73 553443.59 MWD+IFR+MS
6200.00 79.67 220.78 4025.07 3954.57 807.35 -3207.99 10.00 6010903.26 553427.47 MWD+IFR+MS
6225.00 81.68 219.27 4029.12 3958.62 788.46 -3223.85 10.00 6010884.25 553411.76 MWD+IFR+MS
6234.98 82.48 218.67 4030.50 3960.00 780.77 -3230.07 10.00 6010876.52 553405.60 TSBD-Top OA
6250.00 83.69 217.77 4032.31 3961.81 769.06 -3239.29 10.00 6010864.74 553396.46 MWD+IFR+MS
6275.00 85.71 216.29 4034.62 3964.12 749.19 -3254.28 10.00 6010844.76 553381.63 MWD+IFR+MS
6300.00 87.72 214.81 4036.05 3965.55 728.88 -3268.79 10.00 6010824.34 553367.27 MWD+IFR+MS
6325.00 89.74 213.34 4036.60 3966.10 708.18 -3282.79 10.00 6010803.54 553353.43 MWD+IFR+MS
6350.00 91.77 211.86 4036.27 3965.77 687.12 -3296.26 10.00 6010782.38 553340.12 MWD+IFR+MS
6351.70 91.90 211.76 4036.22 3965.72 685.68 -3297.16 10.00 6010780.93 553339.24 End Dir : 6351
6375.00 91.90 211.76 4035.45 3964.95 665.88 -3309.42 0.00 6010761.04 553327.13 MWD+IFR+MS
6400.00 91.90 211.76 4034.62 3964.12 644.63 -3322.57 0.00 6010739.70 553314.14 MWD+IFR+MS
6425.00 91.90 211.76 4033.79 3963.29 623.39 -3335.72 0.00 6010718.36 553301.15 MWD+IFR+MS
6450.00 91.90 211.76 4032.96 3962.46 602.15 -3348.88 0.00 6010697.02 553288.16 MWD+IFR+MS
6475.00 91.90 211.76 4032.13 3961.63 580.90 -3362.03 0.00 6010675.68 553275.17 MWD+IFR+MS
6500.00 91.90 211.76 4031.29 3960.79 559.66 -3375.18 0.00 6010654.33 553262.18 MWD+IFR+MS
6525.00 91.90 211.76 4030.46 3959.96 538.42 -3388.34 0.00 6010632.99 553249.19 MWD+IFR+MS
6550.00 91.90 211.76 4029.63 3959.13 517.17 -3401.49 0.00 6010611.65 553236.20 MWD+IFR+MS
6575.00 91.90 211.76 4028.80 3958.30 495.93 -3414.64 0.00 6010590.31 553223.21 MWD+IFR+MS
6600.00 91.90 211.76 4027.97 3957.47 474.68 -3427.80 0.00 6010568.97 553210.22 MWD+IFR+MS
6625.00 91.90 211.76 4027.14 3956.64 453.44 -3440.95 0.00 6010547.63 553197.23 MWD+IFR+MS
6650.00 91.90 211.76 4026.31 3955.81 432.20 -3454.10 0.00 6010526.29 553184.24 MWD+IFR+MS
6675.00 91.90 211.76 4025.48 3954.98 410.95 -3467.26 0.00 6010504.95 553171.25 MWD+IFR+MS
6700.00 91.90 211.76 4024.65 3954.15 389.71 -3480.41 0.00 6010483.61 553158.26 MWD+IFR+MS
6725.00 91.90 211.76 4023.82 3953.32 368.46 -3493.56 0.00 6010462.27 553145.27 MWD+IFR+MS
6750.00 91.90 211.76 4022.99 3952.49 347.22 -3506.72 0.00 6010440.92 553132.28 MWD+IFR+MS
6775.00 91.90 211.76 4022.16 3951.66 325.98 -3519.87 0.00 6010419.58 553119.29 MWD+IFR+MS
6800.00 91.90 211.76 4021.33 3950.83 304.73 -3533.02 0.00 6010398.24 553106.29 MWD+IFR+MS
6825.00 91.90 211.76 4020.50 3950.00 283.49 -3546.18 0.00 6010376.90 553093.30 MWD+IFR+MS
6850.00 91.90 211.76 4019.67 3949.17 262.25 -3559.33 0.00 6010355.56 553080.31 MWD+IFR+MS
6875.00 91.90 211.76 4018.84 3948.34 241.00 -3572.48 0.00 6010334.22 553067.32 MWD+IFR+MS
6900.00 91.90 211.76 4018.01 3947.51 219.76 -3585.64 0.00 6010312.88 553054.33 MWD+IFR+MS
6925.00 91.90 211.76 4017.18 3946.68 198.51 -3598.79 0.00 6010291.54 553041.34 MWD+IFR+MS
6950.00 91.90 211.76 4016.35 3945.85 177.27 -3611.94 0.00 6010270.20 553028.35 MWD+IFR+MS
6975.00 91.90 211.76 4015.52 3945.02 156.03 -3625.10 0.00 6010248.86 553015.36 MWD+IFR+MS
6981.62 91.90 211.76 4015.30 3944.80 150.40 -3628.58 0.00 6010243.21 553011.92 Start Dir 4/100
7000.00 92.29 211.14 4014.63 3944.13 134.73 -3638.16 4.00 6010227.46 553002.46 MWD+IFR+MS
7025.00 92.82 210.29 4013.52 3943.02 113.26 -3650.92 4.00 6010205.90 552989.87 MWD+IFR+MS
7050.00 93.35 209.44 4012.17 3941.67 91.61 -3663.35 4.00 6010184.16 552977.60 MWD+IFR+MS
7075.00 93.88 208.59 4010.60 3940.10 69.79 -3675.45 4.00 6010162.25 552965.67 MWD+IFR+MS
7076.42 93.91 208.54 4010.50 3940.00 68.55 -3676.13 4.00 6010161.00 552965.00 MPH-16 L 1 Mid 0
7077.00 93.91 208.56 4010.46 3939.96 68.04 -3676.41 3.99 6010160.49 552964.73 End Dir : 7077
7100.00 93.91 208.56 4008.89 3938.39 47.89 -3687.38 0.00 6010140.26 552953.91 MWD+IFR+MS
7125.00 93.91 208.56 4007.19 3936.69 25.98 -3699.30 0.00 6010118.26 552942.15 MWD+IFR+MS
7150.00 93.91 208.56 4005.49 3934.99 4.08 -3711.23 0.00 6010096.27 552930.39 MWD+IFR+MS
7175.00 93.91 208.56 4003.78 3933.28 -17.83 -3723.15 0.00 6010074.27 552918.64 MWD+IFR+MS
7200.00 93.91 208.56 4002.08 3931.58 -39.74 -3735.08 0.00 6010052.28 552906.88 MWD+IFR+MS
7225.00 93.91 208.56 4000.38 3929.88 -61.64 -3747.00 0.00 6010030.29 552895.12 MWD+IFR+MS
7250.00 93.91 208.56 3998.67 3928.17 -83.55 -3758.93 0.00 6010008.29 552883.36 MWD+IFR+MS
7275.00 93.91 208.56 3996.97 3926.47 -105.46 -3770.86 0.00 6009986.30 552871.61 MWD+IFR+MS
·
e
BP
BP Planning Report
7300.00 93.91 208.56 3995.26 3924.76 -127.36 -3782.78 0.00 6009964.30 552859.85 MWD+IFR+MS
7325.00 93.91 208.56 3993.56 3923.06 -149.27 -3794.71 0.00 6009942.31 552848.09 MWD+IFR+MS
7350.00 93.91 208.56 3991.86 3921.36 -171.17 -3806.63 0.00 6009920.32 552836.33 MWD+IFR+MS
7375.00 93.91 208.56 3990.15 3919.65 -193.08 -3818.56 0.00 6009898.32 552824.58 MWD+IFR+MS
7400.00 93.91 208.56 3988.45 3917.95 -214.99 -3830.48 0.00 6009876.33 552812.82 MWD+IFR+MS
7425.00 93.91 208.56 3986.75 3916.25 -236.89 -3842.41 0.00 6009854.33 552801.06 MWD+IFR+MS
7450.00 93.91 208.56 3985.04 3914.54 -258.80 -3854.33 0.00 6009832.34 552789.31 MWD+IFR+MS
7475.00 93.91 208.56 3983.34 3912.84 -280.71 -3866.26 0.00 6009810.35 552777.55 MWD+IFR+MS
7500.00 93.91 208.56 3981.64 3911.14 -302.61 -3878.18 0.00 6009788.35 552765.79 MWD+IFR+MS
7525.00 93.91 208.56 3979.93 3909.43 -324.52 -3890.11 0.00 6009766.36 552754.03 MWD+IFR+MS
7550.00 93.91 208.56 3978.23 3907.73 -346.42 -3902.03 0.00 6009744.36 552742.28 MWD+IFR+MS
7575.00 93.91 208.56 3976.52 3906.02 -368.33 -3913.96 0.00 6009722.37 552730.52 MWD+IFR+MS
7600.00 93.91 208.56 3974.82 3904.32 -390.24 -3925.89 0.00 6009700.38 552718.76 MWD+IFR+MS
7625.00 93.91 208.56 3973.12 3902.62 -412.14 -3937.81 0.00 6009678.38 552707.00 MWD+IFR+MS
7650.00 93.91 208.56 3971.41 3900.91 -434.05 -3949.74 0.00 6009656.39 552695.25 MWD+IFR+MS
7675.00 93.91 208.56 3969.71 3899.21 -455.96 -3961.66 0.00 6009634.39 552683.49 MWD+IFR+MS
7700.00 93.91 208.56 3968.01 3897.51 -477.86 -3973.59 0.00 6009612.40 552671.73 MWD+IFR+MS
7725.00 93.91 208.56 3966.30 3895.80 -499.77 -3985.51 0.00 6009590.41 552659.97 MWD+IFR+MS
7750.00 93.91 208.56 3964.60 3894.10 -521.67 -3997.44 0.00 6009568.41 552648.22 MWD+IFR+MS
7775.00 93.91 208.56 3962.90 3892.40 -543.58 -4009.36 0.00 6009546.42 552636.46 MWD+IFR+MS
7781.42 93.91 208.56 3962.46 3891.96 -549.20 -4012.42 0.00 6009540.77 552633.44 Start Dir 4/100
7800.00 93.84 207.82 3961.20 3890.70 -565.54 -4021.18 4.00 6009524.37 552624.81 MWD+IFR+MS
7810.55 93.80 207.40 3960.50 3890.00 -574.87 -4026.06 4.00 6009515.00 552620.00 MPH-16 L1 Mid 0
7825.00 93.76 207.98 3959.55 3889.05 -587.64 -4032.76 4.00 6009502.19 552613.40 MWD+IFR+MS
7850.00 93.70 208.98 3957.92 3887.42 -609.57 -4044.66 4.00 6009480.17 552601.67 MWD+IFR+MS
7855.64 93.68 209.20 3957.56 3887.06 -614.49 -4047.39 4.00 6009475.23 552598.97 End Dir : 7855
7875.00 93.68 209.20 3956.32 3885.82 -631.35 -4056.82 0.00 6009458.30 552589.67 MWD+IFR+MS
7900.00 93.68 209.20 3954.71 3884.21 -653.13 -4068.99 0.00 6009436.43 552577.67 MWD+IFR+MS
7925.00 93.68 209.20 3953.11 3882.61 -674.91 -4081.16 0.00 6009414.56 552565.66 MWD+IFR+MS
7950.00 93.68 209.20 3951.50 3881.00 -696.68 -4093.34 0.00 6009392.70 552553.66 MWD+IFR+MS
7975.00 93.68 209.20 3949.90 3879.40 -718.46 -4105.51 0.00 6009370.83 552541.65 MWD+IFR+MS
8000.00 93.68 209.20 3948.29 3877.79 -740.24 -4117.68 0.00 6009348.96 552529.65 MWD+IFR+MS
8025.00 93.68 209.20 3946.69 3876.19 -762.01 -4129.86 0.00 6009327.10 552517.64 MWD+IFR+MS
8050.00 93.68 209.20 3945.08 3874.58 -783.79 -4142.03 0.00 6009305.23 552505.63 MWD+IFR+MS
8075.00 93.68 209.20 3943.48 3872.98 -805.57 -4154.20 0.00 6009283.36 552493.63 MWD+IFR+MS
8100.00 93.68 209.20 3941.87 3871.37 -827.35 -4166.37 0.00 6009261.49 552481.62 MWD+IFR+MS
8125.00 93.68 209.20 3940.27 3869.77 -849.12 -4178.55 0.00 6009239.63 552469.62 MWD+IFR+MS
8143.75 93.68 209.20 3939.06 3868.56 -865.45 -4187.67 0.00 6009223.23 552460.61 Start Dir 8/100
8150.00 93.60 209.70 3938.67 3868.17 -870.89 -4190.74 8.00 6009217.77 552457.59 MWD+IFR+MS
8175.00 93.26 211.67 3937.17 3866.67 -892.35 -4203.48 8.00 6009196.22 552445.02 MWD+IFR+MS
8200.00 92.92 213.65 3935.82 3865.32 -913.36 -4216.95 8.00 6009175.10 552431.71 MWD+IFR+MS
8225.00 92.58 215.62 3934.63 3864.13 -933.91 -4231.14 8.00 6009154.45 552417.67 MWD+IFR+MS
8250.00 92.23 217.59 3933.58 3863.08 -953.96 -4246.03 8.00 6009134.29 552402.93 MWD+IFR+MS
8275.00 91.88 219.56 3932.68 3862.18 -973.49 -4261.61 8.00 6009114.65 552387.51 MWD+IFR+MS
8300.00 91.53 221.53 3931.94 3861 .44 -992.48 -4277.85 8.00 6009095.54 552371.41 MWD+IFR+MS
8325.00 91.17 223.50 3931.35 3860.85 -1010.90 -4294.74 8.00 6009076.99 552354.66 MWD+IFR+MS
8350.00 90.82 225.47 3930.91 3860.41 -1028.73 -4312.26 8.00 6009059.03 552337.29 MWD+IFR+MS
8375.00 90.46 227.44 3930.63 3860.13 -1045.95 -4330.37 8.00 6009041.67 552319.30 MWD+IFR+MS
8400.00 90.11 229.40 3930.51 3860.01 -1062.54 -4349.07 8.00 6009024.94 552300.73 MWD+IFR+MS
8407.56 90.00 230.00 3930.50 3860.00 -1067.44 -4354.84 8.00 6009020.00 552295.00 MPH-16 L 1 Mid 0
8425.00 89.58 231.33 3930.56 3860.06 -1078.49 -4368.33 8.00 6009008.85 552281.60 MWD+IFR+MS
8450.00 88.97 233.24 3930.88 3860.38 -1093.78 -4388.10 8.00 6008993.41 552261.94 MWD+IFR+MS
.
.
BP
BP Planning Report
8475.00 88.37 235.14 3931.46 3860.96 -1108.40 -4408.37 8.00 6008978.63 552241.79 MWD+IFR+MS
8500.00 87.77 237.05 3932.30 3861.80 -1122.34 -4429.11 8.00 6008964.54 552221.16 MWD+IFR+MS
8510.51 87.51 237.85 3932.74 3862.24 -1127.99 -4437.95 8.00 6008958.83 552212.36 End Dir : 8510
8525.00 87.51 237.85 3933.37 3862.87 -1135.69 -4450.21 0.00 6008951.03 552200.16 MWD+IFR+MS
8550.00 87.51 237.85 3934.45 3863.95 -1148.98 -4471.36 0.00 6008937.58 552179.11 MWD+IFR+MS
8575.00 87.51 237.85 3935.53 3865.03 -1162.27 -4492.51 0.00 6008924.13 552158.07 MWD+IFR+MS
8600.00 87.51 237.85 3936.62 3866.12 -1175.56 -4513.66 0.00 6008910.69 552137.03 MWD+IFR+MS
8625.00 87.51 237.85 3937.70 3867.20 -1188.85 -4534.80 0.00 6008897.24 552115.98 MWD+IFR+MS
8650.00 87.51 237.85 3938.79 3868.29 -1202.14 -4555.95 0.00 6008883.79 552094.94 MWD+IFR+MS
8675.00 87.51 237.85 3939.87 3869.37 -1215.43 -4577.10 0.00 6008870.34 552073.89 MWD+IFR+MS
8700.00 87.51 237.85 3940.96 3870.46 -1228.72 -4598.25 0.00 6008856.89 552052.85 MWD+IFR+MS
8725.00 87.51 237.85 3942.04 3871.54 -1242.01 -4619.39 0.00 6008843.44 552031.81 MWD+IFR+MS
8750.00 87.51 237.85 3943.12 3872.62 -1255.30 -4640.54 0.00 6008829.99 552010.76 MWD+IFR+MS
8775.00 87.51 237.85 3944.21 3873.71 -1268.59 -4661.69 0.00 6008816.55 551989.72 MWD+IFR+MS
8800.00 87.51 237.85 3945.29 3874.79 -1281.88 -4682.84 0.00 6008803.10 551968.68 MWD+IFR+MS
8825.00 87.51 237.85 3946.38 3875.88 -1295.17 -4703.98 0.00 6008789.65 551947.63 MWD+IFR+MS
8837.87 87.51 237.85 3946.94 3876.44 -1302.01 -4714.87 0.00 6008782.73 551936.80 Start Dir 8/100
8850.00 87.70 236.90 3947.44 3876.94 -1308.54 -4725.08 8.00 6008776.12 551926.64 MWD+IFR+MS
8875.00 88.07 234.93 3948.37 3877.87 -1322.54 -4745.77 8.00 6008761.96 551906.06 MWD+IFR+MS
8900.00 88.45 232.97 3949.13 3878.63 -1337.25 -4765.97 8.00 6008747.10 551885.97 MWD+IFR+MS
8925.00 88.83 231.01 3949.72 3879.22 -1352.64 -4785.66 8.00 6008731.57 551866.40 MWD+IFR+MS
8950.00 89.21 229.04 3950.15 3879.65 -1368.70 -4804.81 8.00 6008715.36 551847.37 MWD+IFR+MS
8975.00 89.59 227.08 3950.41 3879.91 -1385.40 -4823.41 8.00 6008698.52 551828.91 MWD+IFR+MS
9000.00 89.98 225.12 3950.50 3880.00 -1402.74 -4841.42 8.00 6008681.05 551811.03 MWD+IFR+MS
9001.47 90.00 225.00 3950.50 3880.00 -1403.78 -4842.46 8.00 6008680.00 551810.00 MPH-16 L1 Mid 0
9025.00 90.08 223.12 3950.48 3879.98 -1420.68 -4858.82 8.00 6008662.97 551793.77 MWD+IFR+MS
9050.00 90.17 221.12 3950.43 3879.93 -1439.23 -4875.59 8.00 6008644.30 551777.14 MWD+IFR+MS
9075.00 90.25 219.12 3950.34 3879.84 -1458.34 -4891.70 8.00 6008625.07 551761.18 MWD+IFR+MS
9100.00 90.33 217.12 3950.21 3879.71 -1478.01 -4907.13 8.00 6008605.29 551745.90 MWD+IFR+MS
9125.00 90.42 215.13 3950.05 3879.55 -1498.20 -4921.87 8.00 6008584.99 551731.32 MWD+IFR+MS
9150.00 90.50 213.13 3949.85 3879.35 -1518.89 -4935.89 8.00 6008564.19 551717.45 MWD+IFR+MS
9175.00 90.58 211.13 3949.61 3879.11 -1540.06 -4949.19 8.00 6008542.92 551704.32 MWD+IFR+MS
9200.00 90.67 209.13 3949.34 3878.84 -1561.68 -4961.74 8.00 6008521.21 551691.94 MWD+IFR+MS
9225.00 90.75 207.13 3949.03 3878.53 -1583.73 -4973.52 8.00 6008499.08 551680.32 MWD+IFR+MS
9250.00 90.83 205.13 3948.68 3878.18 ' -1606.17 -4984.53 8.00 6008476.56 551669.48 MWD+IFR+MS
9275.00 90.91 203.14 3948.30 3877.80 -1628.98 -4994.75 8.00 6008453.67 551659.43 MWD+IFR+MS
9300.00 90.99 201.14 3947.89 3877.39 -1652.13 -5004.17 8.00 6008430.45 551650.19 MWD+IFR+MS
9325.00 91.06 199.14 3947.44 3876.94 -1675.60 -5012.78 8.00 6008406.92 551641.77 MWD+IFR+MS
9350.00 91.14 197.14 3946.96 3876.46 -1699.35 -5020.56 8.00 6008383.11 551634.17 MWD+IFR+MS
9361.54 91.17 196.22 3946.73 3876.23 -1710.41 -5023.87 8.00 6008372.03 551630.94 End Dir : 9361
9375.00 91.17 196.22 3946.45 3875.95 -1723.32 -5027.63 0.00 6008359.09 551627.28 MWD+IFR+MS
9400.00 91.17 196.22 3945.94 3875.44 -1747.32 -5034.61 0.00 6008335.04 551620.49 MWD+IFR+MS
9425.00 91.17 196.22 3945.43 3874.93 -1771.33 -5041.59 0.00 6008310.99 551613.69 MWD+IFR+MS
9450.00 91.17 196.22 3944.92 3874.42 -1795.33 -5048.57 0.00 6008286.94 551606.89 MWD+IFR+MS
9475.00 91.17 196.22 3944.40 3873.90 -1819.33 -5055.55 0.00 6008262.89 551600.09 MWD+IFR+MS
9500.00 91.17 196.22 3943.89 3873.39 -1843.33 -5062.53 0.00 6008238.84 551593.30 MWD+IFR+MS
9525.00 91.17 196.22 3943.38 3872.88 -1867.33 -5069.51 0.00 6008214.79 551586.50 MWD+IFR+MS
9550.00 91.17 196.22 3942.87 3872.37 -1891.33 -5076.49 0.00 6008190.73 551579.70 MWD+IFR+MS
9575.00 91.17 196.22 3942.35 3871.85 -1915.33 -5083.4 7 0.00 6008166.68 551572.91 MWD+IFR+MS
9600.00 91.17 196.22 3941.84 3871.34 -1939.33 -5090.45 0.00 6008142.63 551566.11 MWD+IFR+MS
9625.00 91.17 196.22 3941.33 3870.83 -1963.33 -5097.43 0.00 6008118.58 551559.31 MWD+IFR+MS
9650.00 91.17 196.22 3940.82 3870.32 -1987.33 -5104.41 0.00 6008094.53 551552.52 MWD+IFR+MS
9675.00 91.17 196.22 3940.30 3869.80 -2011.33 -5111.39 0.00 6008070.48 551545.72 MWD+IFR+MS
.
.
BP
BP Planning Report
9700.00 91.17 196.22 3939.79 3869.29 -2035.33 -5118.37 0.00 6008046.43 551538.92 MWD+IFR+MS
9725.00 91.17 196.22 3939.28 3868.78 -2059.33 -5125.35 0.00 6008022.38 551532.13 MWD+IFR+MS
9750.00 91.17 196.22 3938.77 3868.27 -2083.33 -5132.33 0.00 6007998.33 551525.33 MWD+IFR+MS
9775.00 91.17 196.22 3938.25 3867.75 -2107.33 -5139.31 0.00 6007974.28 551518.53 MWD+IFR+MS
9800.00 91.17 196.22 3937.74 3867.24 -2131.33 -5146.29 0.00 6007950.23 551511.74 MWD+IFR+MS
9825.00 91.17 196.22 3937.23 3866.73 -2155.33 -5153.27 0.00 6007926.18 551504.94 MWD+IFR+MS
9850.00 91.17 196.22 3936.72 3866.22 -2179.33 -5160.25 0.00 6007902.13 551498.14 MWD+IFR+MS
9875.00 91.17 196.22 3936.20 3865.70 -2203.33 -5167.23 0.00 6007878.08 551491.35 MWD+IFR+MS
9900.00 91.17 196.22 3935.69 3865.19 -2227.33 -5174.21 0.00 6007854.03 551484.55 MWD+IFR+MS
9909.00 91.17 196.22 3935.51 3865.01 -2235.97 -5176.72 0.00 6007845.37 551482.10 Total Depth : 9
9909.38 91.17 196.22 3935.50 - 3865.00 -2236.34 -5176.82 0.00 6007845.00 551482.00 MPH-16 L1 Mid 0
WELL DET A]LS
N"", -<-Nl-S -<-Ef·W Northing fasting Latitude Longitude S"'.
PlanNeo(MPH.[6) ]139.36 1244.90 60[0120.38 556641.19 7CJ"26'17.870N 149"]2'17.3S6W NfA
160
150
125
100
75
50
o
ANTI-COLLISION SETTINGS
COMPANY DETAILS
SURVEY PROGRAM
Depth Fm Depth To Survey/Plan
6135.00 9909.38 Planned: MPH·!6 LI WP02 VI6
From
o
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
Colour
ToMD
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
Tool
MWD+IFR+MS
WELLPATH DETAILS
MPH-16 LI
ParentWellpath: MPH-16
TjeonMD: 6\35.00
Rig:
Ref. Datum: 34.3+36.2 70.50ft
V.Seclion Origin Origin Starting
Angle +N/-S +E/-W From TVD
246.64° 0.00 0.00 34.30
-
LEGEND
Plan Helix (Helix L I), Major Risk
Plan Helix (Helix Ll), Major Risk
Plan Helix (Helix LJ), Major Risk.
Plan Neo ( MPH-16) (MPH-16), NOERRORS
MPI-OI (Pian MPI...oIA), Major Risk
MPI-OI (Plan MPI-O!ALl). Major Risk
MPI-03 (MPI-OJ), Major Risk
MPI-04A (MPI-04A), Major Risk
MPI-04 (MPI-04), Major Risk
MPI-04 (MPI-04A). Major Risk
MPI-04 (MP!-04ALI), Majer Risk
MPI-04 (MPI-04APBI). Major Risk
MPI.04 (MPI-04PBI). Major Risk
MPI-OS (MPI-OS), Major Risk
MPI-07 (MPI-07). Major Risk
MP!-IS (MP]-15), Major Risk.
MPI-15 (MPI-\5LI). Major Risk
MPI-15 (MPI-15PB1). Major Risk
Plan MPI-]6 (MPI-16), Major Risk
Plan MPI-17 Thor (Plan MPI-17 LI), Major Risk
Plan MPI-17 Thor (Plan MP!-17 L2), Major Risk
Plan MPI-17 Thor (Plan MPI-17), Major Risk
Plan MP]-17 TOOr (Rig: MPI-17), Major Risk
MPH-16LI
MPH-]6 LI WP02
Interpolation Method:MD
Depth Range From: 6135,00
Maximum Range: 1187.51
BP Amoco
Calculalion Method: Minimum Curvature
icr: ~= ~~vW¿~ndetNorth
Error Surface: Elliptical'" Casing
Warning Method: Rules Based
90
-
75
100
SECfION DETAILS
So< MD loc An TVD -<-Nl-S -+-FJ-W Dl<g TFace VS<c Tuse·
1 6135.00 74.16 225.04 4010.49 853.79 -3164.97 0.00 0.00 2566.87
2 615S.00 76.08 223.55 4015.62 839.9S -3[78.47 12.00 -37.00 2584.75
125 3 6351.70 91.90 2]1.76 4036.22 685.68 -3297.16 10.00 -3735 2754.89
4 6981.62 91.90 211.76 401S.30 150.40 -3628.58 0.00 0.00 3271.41
, 7076.42 93.91 """.. 4010.50 68.55 -3676.13 4.00 -58.05 3347.52 MPH-16 LI MidOA TI
6 7077.00 93.91 208.56 4010.46 68.04 -3676.41 4.00 84.75 3347.97
7 7781.42 93.91 208.56 3962.46 -549.20 -4012.42 0.00 0.00 3901.22
. 7810.55 93.80 207.40 3960.50 -574.87 -4026.06 4.00 -9525 3923.92 MPH-16 LJ Mid OA T2
9 7855.64 93.68 209.20 3957.56 -614.49 ..4047.39 4.00 93.74 395911
10 8143.75 93.68 209.20 3939.06 -865.45 -4187.67 0.00 0.00 4187.52
150 II 8407.56 90.00 230.00 3930.50 -1067.44 -4354.84 '.00 99.59 4421.08 MPH-16 LI Mid OA TJ
12 8510.51 87.51 237.85 3932.74 -1127.99 -4437.95 '.00 107.63 452139
IJ 8837.87 87.51 237.85 3946.94 -1302.01 -4714.87 0.00 0.00 4844.61
160 14 9001.47 90.00 22S.OO 3950.50 -1403.78 -4842.46 '.00 ·7914 5002.09 MPH-16 LI MidOA 14
" 936I.S4 91.17 196.22 3946.73 ·1710.41 -5023.87 '.00 -87.5. '29023
t6 990938 91.17 19622 3935.50 -2236.34 -5176.82 0.00 0.00 563921 MPH-16 LI MidOA T5
Interval: 25.00
To: 9909.38
Reference: Plan: MPH-16 Ll WP02
5
5
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in]
.
BP
Anticollision Report
.
Company: BP Amoco Date: 8/11/2004 Time: 16:27:52 Page: 1
Field: Milne Point
Reference Site: M Pt H Pad CCHlrdinate(NE) Reference: Well: Plan Neo (MPH-16). True North
Reference Well: Plan Neo ( MPH-16 ) Vertical (fVD) Reference: 34.3+36.2 70.5
Reference Wellpath: MPH-16 L 1 Db: Oracle
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 ofreference Reference: Plan: MPH-16 L 1 WP02 & NOT PLANNE
Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse
Depth Range: 6135.00 to 9909.38 ft Scan Method: Trav Cylinder North
Maximum Radius: 1187.51 ft Error Surface: Ellipse + Casing
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
9909.80 3935.49 4.500 6.750 41/2"
Plan: MPH-16 L1 WP02 Date Composed: 6/29/2004
Version: 16
Principal: Yes Tied-to: From: Definitive Path
Summary
<: Offset Wellpath > Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
MPtHPad Plan Helix Helix L 1 V1 Plan: Heli 6357.45 10650.00 857.60 138.28 719.31 Pass: Major Risk
MPtHPad Plan Helix Helix L2 V1 Plan: Heli 6371.28 6225.00 859.85 109.31 750.54 Pass: Major Risk
M Pt H Pad Plan Helix Helix L3 V1 Plan: Heli 6365.19 8475.00 832.68 119.48 713.20 Pass: Major Risk
M pt H Pad Plan Neo (MPH-16) MPH-16 V2 Plan: MPH-166150.00 6150.00 0.18 0.00 0.18 Pass: NOERRORS
MPt Pad MPI-01 Plan MPI-01A VO Plan: 8300.00 3875.00 1014.38 134.17 880.21 Pass: Major Risk
MPt Pad MPI-01 Plan MPI-01AL 1 VO Plan 8300.00 3875.00 1014.38 134.01 880.38 Pass: Major Risk
MPt Pad MPI-03 MPI-03 V1 9758.23 4300.00 626.98 130.71 496.26 Pass: Major Risk
M pt Pad MPI-04A MPI-04A V1 6492.94 4650.00 686.70 131.59 555.11 Pass: Major Risk
M Pt Pad MPI-04 MPI-04 V5 6499.60 4650.00 687.27 128.03 559.24 Pass: Major Risk
M pt Pad MPI-04 MPI-04A V5 6469.54 4650.00 684.32 128.34 555.98 Pass: Major Risk
M pt Pad MPI-04 MPI-04AL 1 V2 6380.12 4725.00 666.82 128.91 537.92 Pass: Major Risk
MPt Pad MPI-04 MPI-04APB1 V1 6469.54 4650.00 684.32 128.34 555.98 Pass: Major Risk
MPt Pad MPI-04 MPI-04PB1 V3 6389.78 4725.00 685.56 128.76 556.80 Pass: Major Risk
MPt Pad MPI-05 MPI-05 V1 7736.88 3950.00 981.39 99.20 882.19 Pass: Major Risk
MPt Pad MPI-07 MPI-07 V1 8599.75 3975.00 923.36 204.59 718.77 Pass: Major Risk
M pt Pad MPI-15 MPI-15 V6 8311.97 3850.00 1007.63 122.13 885.50 Pass: Major Risk
MPt Pad MPI-15 MPI-15L 1 V2 8311.97 3850.00 1007.63 122.03 885.60 Pass: Major Risk
M Pt Pad MPI-15 MPI-15PB1 V5 8311.97 3850.00 1007.63 122.03 885.60 Pass: Major Risk
MPt Pad Plan MPI-16 MPI-16 V5 Plan: MPI-16 Out of range
MPt Pad Plan MPI-17 Thor Plan MPI-17 L 1 VO Plan 9039.94 3375.00 1110.68 123.61 987.07 Pass: Major Risk
MPt Pad Plan MPI-17 Thor Plan MPI-17 L2 VO Plan 9039.94 3375.00 1110.68 123.61 987.07 Pass: Major Risk
M Pt Pad Plan MPI-17 Thor Plan MPI-17 V5 Plan: M 9040.01 3375.00 1110.71 125.08 985.63 Pass: Major Risk
M Pt Pad Plan MPI-17 Thor Rig: MPI-17 V9 9025.10 3350.00 1103.55 121.51 982.04 Pass: Major Risk
Site: M Pt H Pad
Well: Plan Helix Rule Assigned: Major Risk
Well path: Helix L 1 V1 Plan: Helix L 1 wp01 V20 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HIDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
6971.95 4015.62 9950.00 3956.00 21.19 14.00 124.65 272.88 1176.11 137.30 1038.81 Pass
6953.17 4016.25 9975.00 3956.46 21.14 14.04 124.70 272.93 1159.64 137.24 1022.40 Pass
6934.11 4016.88 10000.00 3956.91 21.08 14.08 124.75 272.98 1143.50 137.17 1006.33 Pass
6914.75 4017.52 10025.00 3957.37 21.03 14.14 124.80 273.03 1127.71 137.14 990.57 Pass
6895.12 4018.18 10050.00 3957.82 20.97 14.19 124.85 273.09 1112.27 137.10 975.17 Pass
6875.21 4018.84 10075.00 3958.27 20.92 14.24 124.90 273.14 1097.18 137.07 960.12 Pass
6855.03 4019.51 10100.00 3958.73 20.86 14.29 124.96 273.19 1082.46 137.03 945.43 Pass
6834.60 4020.19 10125.00 3959.18 20.81 14.35 125.01 273.25 1068.09 137.02 931.07 Pass
6813.91 4020.87 10150.00 3959.64 20.75 14.42 125.07 273.31 1054.10 137.01 917.09 Pass
6792.97 4021.57 10175.00 3960.09 20.70 14.48 125.13 273.36 1040.48 137.00 903.48 Pass
6771.79 4022.27 10200.00 3960.54 20.64 14.54 125.18 273.42 1027.23 136.99 890.24 Pass
6750.38 4022.98 10225.00 3961.00 20.59 14.62 125.24 273.48 1014.37 137.01 877.36 Pass
6728.74 4023.70 10250.00 3961.45 20.53 14.69 125.30 273.54 1001.90 137.03 864.87 Pass
6706.88 4024.43 10275.00 3961.91 20.48 14.76 125.36 273.59 989.81 137.05 852.76 Pass
6684.81 4025.16 10300.00 3962.36 20.42 14.84 125.42 273.65 978.12 137.07 841.05 Pass
~- --- -- ._--~- --..-. .- ..".-.
PRO
I
149 36 00 Vf
I
149 34 00 W
149 32 00 VI
MPU H-16L 1
1..01L Proposed
2041910
SFD 9/29/2004
.
.
PERMIT TO DRILL
20 AAC 25.005
(e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well
branches are proposed from a single conductor, surface, or production casing, the applicant shall
designate one branch as the primary we II bore and include all information required under (c) of this section
with the application for a Permit to Drill for that branch. For each subsequent well branch, the application
for a Permit to Drill need only include information under (c) of this section that is unique to that branch
and need not include the $100 fee.
.
.
TRANSMJT AL LETTER CHECKLIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BEINCLUDEDINTRANSMITTALL~~.ET ER
WELL NAME m~j( If-It 1-/
20'1- /éJ (
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API num ber
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), aU
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit pJus PH)
and API Dum ber (50
70/80) from records, data and logs acquired
for well (name on permit).
PD...OT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07110/02
C\jody\templates
The permit is approved subject to fuD
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes tbe liability of any
protest to the spa~~ .e:X'þPtio~.th.~ my
occur. ~ ð'~./.bxr
All dry ditch sample sets submitted to tbe
Commission must be in no greater than 30'
sample intervals from below tbe permafrost
or from where sampJes are first caught and
10' sample intervals tbrougb target zones.
~C>
9-Z/I.,¥
~
o
Well bore seg
On Annular Disposal
Program DEV
On/Off Shore
Well Name:
PEND GeoArea 89' Unit
-
Multilate~at well~ fee waived per 20,AAC 25JQ05(e)
IT_SBli-16L1
DEV
525140, 90llerned by CO.4 TZ
-
MILNE POJN1, SCHRADER BLI:f= OIL
t-03,
MPU
SpACING ,EXCEPTION REQUjRE;Q
Will open the pooj tnthe, samequarter-Quarter,quarte.r gov,ernmental s,eçtion,as e~i$ting well,
10~ 2004~ reQuested a waiyer ~eQui~emeots.
,of SP,aciog
September
.
NA
Yes
.Yes
.Yes
.Yes
Yes
No
.Y.es
Yes
,Yes
.Yes
No,
Yes
.NA
,NA
NA
NA
Class/Type
Initial
1M
TION (ALASKA
-
Permit fee attache~
,Lease .number ,appropnate
n,ame ,aod oum~r
,U,nique well,
Wel .IQcated in,a define~ ,pool
WelUQcated pr,oper ,distance, from driJling unitb,oundary.
Well .IQcated proper ,distance, from QtlJer welJs
in.dJiUiog unjt
,Sufficient
Jf,deviated,
Qper,ator 01)1y: affected party
,O-pe~ator lJas,apprppriate.b.ood in.force.
jS, weJlbQre platinclu,ded
CO,nserva,tion order
admioist~atille, apprpvaJ
5-day wait
Permitcao be issued wjtlJQut
Permit can be issued wjtlJQut
in,commeots) (For
Can permit
Well'^^~·^,
,Ajl w :hi!1,1l4,llJile,area,of reyiew jdeo!ified (For $eNjee.wetl only:)
Pre-I ~ct iojeçtor~ duration of pre-production less than 3 mOl)ths, (For,service well only)
,AÇN ing ,of Con,si~teocy. h,as bee,nissued, for.!lJis proiect,
lOtI
lojeçtioo Order # (put
be approved before
'"v~,,,d within area and, strata authorized by
,acreage,aYailable
Administration
Date
Appr
SFD
9/29/2004
installed, io MPH,1.6
~~"'''I' An ,....-.-, 14.7J02(b)!3)..
: :1-16.
Conductor
Alt ~'" ':<ð":
SUI
IntE te casiog instalJed jn Mpl:f-:1
Slo !r ,completioo plaoned.
~""I_"''-I'õ;t.~s_e_X'''''I!I....,...çQ ""v_ Vi .{
ca.sing
6.
No reseJlle,pjtplaooe,d. All waste to approve,ddispos.at wells.
Rig ise,quippe,d,VIlith steel.pits.
Nearest weIJb.ore,ÏS mottlerbore :- .70' ,tIld,b.etow,
prp~imity- analysis pe.r(o(n}e,d
BOP wiJI,alrea~y be in ptace.
BI:fP expectect up to .1 0.3 EMW.
.
0.5 in,S6 and intermediate hole.
.1
Planned MW to
:14 day test inteNal. reQu.ested.
30QO.p~iBQp test proposed.,
970 psi
M,ð.SP calcu]atedat
js, equipped,with ,senso~s.and alarms,
Rig
I:f@s is not kn.owo 00 MP ,Hpad
NA
,NA
NA
NA
No
Yes
.Yes
NA
.Yes
NA
Yes
.Yes
.Yes
.Yes
.Yes
No
,NA.
,C.oodu,ctor string.pJovided
,S,urfaee
,CMT vol adeQu,ate to circ,u late, on conductor, & surf,csg
.CMT v,ot adeQuate.!o tie-in.lQng ,strjog to.surf Ç$g
,CMTwil! coyer,all !<OQ'N,n.prQductiYe IJQrizon,s
casingpJQtects all.known USQWs
C,T~ B&. RerllJaf~ost
reserve pit .
to-403 for abandon.ment
,C,asil'1g de.sigo$ ad,eQua,te fpr
.Adequate .tankage OJ
beel'1 app,rQved
Jf.a.re-drilt has a
A~equate.wellbore separatjo,n ,propO$ed
t
meet reguJatioos,
.adequate
does
schematic & equip.list
Jf.diveder JequiJed,
,test to
,Choke,llJanifold cQmpJies w/API RF'-53 (May 84)
WQrk will occur without,
.Is preseoC8. of L ,...." n'~
MeclJa.nical.col
fluid, program
,D,riUiog
18
19
20
21
22
23
24
25
26
27
28
29
30
Engineering
Appr Date
TEM 10/5/2004
jQ,~bLq-
p$ig i!1,comment$)
(put
,BOPEs,. dp .they meet reguJa.tiOr:!
ratiog appropriate;
,BOPE,pre,ss
31
32
33
34
operation shutdown
! '...... ",,,~, probable
Wells within AOR Yertfied (For s,ervjce we/j only)
10,.5 ppg.
10.3jn. N S¡¡lI1ds BŒ8 io O,Sands; plaoned mud weigbUs
E~Pectect reservojr -pre.ssure ts
Yes
Yes
,NA.
NA
NA.
cal'1 be tssued w/o hyd(ogen. s,ulfide measures
Pe(lT1i!,
,D,ata,PJeseoted on pote,ntial ove,rpressurezones
35
136
Date 37
9/29/2004 38
39
Geology
Appr
SFD
,Sei~mic,analysjs of shaJlow 9aszPoeS,
,(if off-Shpre)
.Seabedconditioo survey
Date
r0
CQnta,ct namelphoneJorVlleekly progre$s,reports [exp1oratoryoolyl.
Public
issioner
Date
Engineering
Commissioner:
Date:
lolS/4.
Geologic
Commissioner:
Þ7j
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the me under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
Sperry-Sun Drilling Services
LIS Scan Utility
.
c!(O~-/9 (
$Revision: 3 $
LisLib $Revision: 4 $
Wed Nov 24 11:54:43 2004
Reel Header
Service name...... ...... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name. ............ ...UNKNOWN
Continuation Number..... .01
Previous Reel Name. . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name........ .... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.. ....... .... ...UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
') ~ s-^6
*) OV
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPH-16 L1
500292322760
B.P Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
24-NOV-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003330703
T. MCGUIRE
E. VAUGHN
MWD RUN 2
MW0003330703
T. MCGUIRE
E. VAUGHN
MWD RUN 3
MW0003330703
C.A. DEMOSKI
E. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 9
MW0003330703
C.A. DEMOSKI
D. GREEN
MWD RUN 10
MW0003330703
C.A. DEMOSKI
D. GREEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
34
13N
10E
2969
4003
MSL 0)
70.25
36.20
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
.
BIT SIZE (IN)
13.500
9.875
6.750
SIZE (IN)
20.000
10.750
7.625
DEPTH (FT)
112.0
4182.0
6515.0
.
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE DEPTHS ARE
BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MPH-16 L1 EXITS THE MPH-16 WELLBORE AT
6182'MD/4008'TVD, WITHIN THE RUN 3
INTERVAL.
4. MWD RUNS 1 AND 2 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
5. MWD RUNS 3 & 10 COMPRISED DIRECTIONAL WITH DGR AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). RUN 10 ALSO INCLUDED
AT-BIT INCLINATION (ABI)
AND PRESSURE WHILE DRILLING (PWD). RUN 9 WAS
DIRECTIONAL ONLY TO POSITION
THE WHIPSTOCK, MILL THE WINDOW, AND DRILL A BIT OF
RAT HOLE.
6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM K.COONEY
(SIS/BP), DATED 11/2/04, QUOTING AUTHORIZATION FROM
MIKIE SMITH (BP
GEOLOGIST). MWD DATA ARE CONSIDERED PDC.
7. MWD RUNS 1 - 3, 9 & 10 REPRESENT WELL MPH-16 L1 WITH
API#: 50-029-23227-60.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
9915'MD/3964'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP).
SLIDE = NON-ROTATED INTERVALS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
..
cllpped curves;
.5000
START DEPTH
67.5
112.5
4165.0
4165.0
4165.0
4165.0
4165.0
all bit runs merged.
.
STOP DEPTH
9859.5
9915.0
9866.5
9866.5
9866.5
9866.5
9866.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
9
10
MERGED MAIN PASS.
$
MERGE TOP
67.5
3121. 0
4190.0
6182.5
6208.0
MERGE BASE
3121.0
4190.0
6182.0
6208.0
9915.0
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type.. ...0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units...... .... .Feet
Data Reference Point....... ...... . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. ......... ...Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 67.5 9915 4991.25 19696 67.5 9915
ROP MWD FT/H 0.3 1880.94 175.801 19606 112.5 9915
GR MWD API 18.06 132.09 70.8231 19585 67.5 9859.5
RPX MWD OHMM 0.06 1788.76 18.6098 11404 4165 9866.5
RPS MWD OHMM 2.45 2000 17.8604 11404 4165 9866.5
RPM MWD OHMM 2.53 2000 19.3676 11404 4165 9866.5
RPD MWD OHMM 0.32 2000 20.3126 11404 4165 9866.5
FET MWD HOUR 0.15 178.39 0.894347 11404 4165 9866.5
.
First Reading For Entire File....... ...67.5
Last Reading For Entire File....... ....9915
.
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record. .65535
File Type.......... ..... .LO
Next File Name. ......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation.......04/11/24
Maximum Physical Record..65535
File Type................ LO
Previous File Name.... ...STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
67.5
112.5
STOP DEPTH
3076.0
3121.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
16-0CT-04
Insite
66.37
Memory
3121. 0
112.0
3121. 0
.8
62.2
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
TOOL NUMBER
061497
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
112.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
Water Based
9.50
155.0
9.0
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.
.
300
8.8
.000 .0
.000 75.2
.000 .0
.000 .0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type... ..0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point...... ....... . Undefined
Frame Spacing... ........ ..........60 .1IN
Max frames per record. ....... .....Undefined
Absent value................... ...-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units
FT
FT/H
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 67.5 3121 1594.25 6108 67.5 3121
ROP MWD010 FT/H 2.22 1880.94 152.698 6018 112.5 3121
GR MWD010 API 21.3 117.07 66.5853 6018 67.5 3076
First Reading For Entire File......... .67.5
Last Reading For Entire File.......... .3121
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. .... .04/11/24
Maximum Physical Record..65535
File Type... ......... ... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.. ..... ....1.0.0
Date of Generation... ....04/11/24
Maximum Physical Record. .65535
. .
Flle Type... ........... ..LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
.
header data for each bit run in separate files.
2
.5000
START DEPTH
3076.5
3121. 5
STOP DEPTH
4145.0
4190.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type......... ...... ...0
Data Specification Block Type.....O
Logging Direction... .... ........ ..Down
17-0CT-04
Insite
66.37
Memory
4190.0
3121. 0
4190.0
57.7
62.5
TOOL NUMBER
061497
13.500
112.0
Spud Mud
9.70
80.0
8.0
300
8.4
.000
.000
.000
.000
.0
86.0
.0
.0
Optical log depth units. ~..... .Feet
Data Reference Point.. ......... ...Undefined
Frame Spacing...... .......... .... .60 .1IN
Max frames per record............ . Undefined
Absent value................... ...-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Nsam
1
1
1
Units
FT
FT/H
API
Size
4
4
4
MWD020
MWD020
.
Rep
68
68
68
Code
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3076.5 4190 3633.25 2228 3076.5 4190
ROP MWD020 FT/H 11. 36 417.43 210.663 2138 3121. 5 4190
GR MWD020 API 18.06 132.09 70.5159 2138 3076.5 4145
First Reading For Entire File..... .....3076.5
Last Reading For Entire File..... ..... .4190
File Trailer
Service name. ........... .STSLIB.003
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name... ...... ..STSLIB.004
Physical EOF
File Header
Service name..... ........STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record..65535
File Type.. ..... ...... ...LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
4145.5
4165.0
4165.0
4165.0
4165.0
4165.0
4190.5
#
LOG HEADER DATA
STOP DEPTH
6182.0
6182.0
6182.0
6182.0
6182.0
6182.0
6182.0
.
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type......... . . . . . . . . .0
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units...........Feet
Data Reference Point.......... ... . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units.. . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
20-0CT-04
.
Insite
66.37
Memory
6182.0
4190.0
6182.0
58.3
82.3
TOOL NUMBER
124724
127479
9.875
4182.0
LSND
10.50
53.0
9.0
400
7.4
3.000
1.660
4.500
4.700
65.0
123.2
65.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
.
.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4145.5 6182 5163.75 4074 4145.5 6182
ROP MWD030 FT/H 0.81 492.65 184.802 3984 4190.5 6182
GR MWD030 API 20.44 111.26 64.6646 4074 4145.5 6182
RPX MWD030 OHMM 0.06 68.1 9.52316 4035 4165 6182
RPS MWD030 OHMM 2.45 2000 11.1331 4035 4165 6182
RPM MWD030 OHMM 2.53 2000 14.7071 4035 4165 6182
RPD MWD030 OHMM 0.32 2000 19.3469 4035 4165 6182
FET MWD030 HOUR 0.15 45.63 1.10649 4035 4165 6182
First Reading For Entire File.. ....... .4145.5
Last Reading For Entire File.......... .6182
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation. ..... .04/11/24
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name........ ...STSLIB.005
Physical EOF
File Header
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record. .65535
File Type.... .......... ..LO
Previous File Name. ..... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
5
header data for each bit run in separate files.
9
.5000
START DEPTH
6182.5
STOP DEPTH
6208.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
26-0CT-04
Insite
66.37
Memory
6208.0
6182.0
6208.0
.0
.0
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
$
BOTT.
TOOL TYPE
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.... ..... ....... . Down
Optical log depth units. ....... ...Feet
Data Reference Point........... ...Undefined
Frame Spacing.................. ...60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
TOOL NUMBER
6.750
6183.0
Versa Pro
10.40
64.0
.0
38500
.0
.000
.000
.000
.000
Name Service Order
DEPT
ROP MWD090
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD090 FT/H
Min
6182.5
0.48
Max
6208
24.88
First Reading For Entire File........ ..6182.5
Last Reading For Entire File.......... .6208
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name... ...... ..STSLIB.006
Mean
6195.25
8.37019
Nsam
52
52
.
.0
110.0
.0
.0
First
Reading
6182.5
6182.5
Last
Reading
6208
6208
.
.
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record..65535
File Type................ LO
Previous File Name.... ...STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
6
header data for each bit run in separate files.
10
.5000
START DEPTH
6182.5
6182.5
6182.5
6182.5
6182.5
6182.5
6208.5
STOP DEPTH
9866.5
9866.5
9866.5
9866.5
9859.5
9866.5
9915.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
29-0CT-04
Insite
66.37
Memory
9915.0
6208.0
9915.0
84.8
94.5
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
TOOL NUMBER
87224
156401
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
6183.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
Versa Pro
10.50
64.0
.0
37000
.0
.000
.000
.000
.0
116.2
.0
MUD CAKE AT MT:
.
.000
.
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.. ...0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.......... ...Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD100 FT/H 4 1 68 4 2
GR MWD100 API 4 1 68 8 3
RPX MWD100 OHMM 4 1 68 12 4
RPS MWD100 OHMM 4 1 68 16 5
RPM MWD100 OHMM 4 1 68 20 6
RPD MWD100 OHMM 4 1 68 24 7
FET MWD100 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6182.5 9915 8048.75 7466 6182.5 9915
ROP MWD100 FT/H 0.3 453.02 180.839 7414 6208.5 9915
GR MWD100 API 42.08 130.9 77.7912 7355 6182.5 9859.5
RPX MWD100 OHMM 5.16 1788.76 23.5854 7369 6182.5 9866.5
RPS MWD100 OHMM 4.09 1620.66 21.544 7369 6182.5 9866.5
RPM MWD100 OHMM 4.51 1690.46 21.9195 7369 6182.5 9866.5
RPD MWD100 OHMM 2.54 1620.15 20.8414 7369 6182.5 9866.5
FET MWD100 HOUR 0.23 178.39 0.778187 7369 6182.5 9866.5
First Reading For Entire File......... .6182.5
Last Reading For Entire File... ....... .9915
File Trailer
Service name.......... ...STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name..... ..... .STSLIB.007
Physical EOF
Tape Trailer
Service name............ .LISTPE
· .
Date. . . . . . . . . . . . . . . . . . . . .04/11/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments.......... ..... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File