HomeMy WebLinkAbout204-242
· .
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~Q IJ.- cQ lf~ Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
o Rescan Needed 11111111111" IJIIII
RESCAN
¢ Color Items:
~reYSCale Items: \ ~
o Poor Quality Originals:
DIGITAL DATA
~skettes, No.3
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Other:
OVERSIZED (Non-Scannable)
o Logs of various kinds:
NOTES:
oate:J-/ Mlo 7
11111111111 11111111
Date dþ.o/OJ I~ mP
à. x 30 = bo +d.7) = TOTAL PAGES ~7)
oateoa/ J.D /07 (Count doe, not ;~~Ude cove' ,hëet) VIi P
1111/11111111111111
o Other::
BY: ~
151
WI/P
Project Proofing
BY: ~
Scanning Preparation
BY: ~
Production Scanning
Stage 1 Page Count from Scanned File: ~ c¡ (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ES
BY: ~ Date:~J~O/07
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
NO
151 vvt P
NO
BY:
Maria
Date:
151
III II II111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
11111111111111 11II1
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
R~~4V~a
• STATE OF ALASKA ~ DEB ~ '~ X010
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT `
1a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended
zoAACZS.~os zoAACZS.»o
^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1b. Well Class:
®Development ^Exploratory
^ Service ; _ ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date CQmp., Susp., or Aband.:
~~ 02/07/2010 12. Permit to Drill Number:
204-242 309-355
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded:
1/6/2005 13. API Number:
50-029-21045-04-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached:
1/17/2005 14. Well Name and Number:
PBU K-07D
FWL, SEC. 04, T11 N, R14E, UM
2041
FNL, 473
Top of Productive Horizon:
592' FSL, 1499' FWL, SEC. 33, T12N, R14E, UM g, KB (tt above MSL): 54.E
GL (ft above MSL): 28.21' 15. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
550' FSL, 3768' FWL, SEC. 33, T12N, R14E, UM 9. Plug Back Depth (MD+TVD):
9232' 8405' Oil Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 670744 y_ 5975163 Zone- ASP4 10. Total Depth (MD+TVD):
11901' 8729' 16. Property Designation:
ADL 028300
TPI: x- 671702 y- 5977819 Zone- ASP4
Total Depth: x- 673972 Y- 5977829 Zone- ASP4 11. SSSV Depth (MD+TVD):
N/A 17. Land Use Permit:
f P
fr
TVD
18. Directional Survey: ^ Yes ®No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore:
N/A ft MSL ):
20. Thickness o
erma
ost (
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD GR / EWR, MGR / CCL / CNL 22. Re-Drill/Lateral Top Window MD/TVD:
9316' 8488'
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT `
CASING: WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED ":
" x In ulat d on u r 11 a 11 on r
9- / " 47# L- 2' urfa 6 7 ' 12-1/4" 21 I s 1 PF' '
7" 2 -8 6 0' 1 139' 8362' 7 I 'G'
1 12. 1 4 "
s-vz° x s-3r~s° x z a.a~a i s.z# i L-80 119 1' 43 ' 72 ' a-va° x a-3/a° 62 cu tt Class 'G'
24. Open to production or in~ection~ ^ Yes ®No 25. Tuewc RECORD
If Yes, list each interval open
Perforation Size and Number):
(MD+TVD of To
& Bottom SIZE DEPTH SET MD PACKER .SET MD / TVD
p
; 4-1/2", 12.6#, L-80 9040' 9011' / 8185'
MD TVD MD TVD
26. ACID, fRACTURE; CEMENT SQUEEZE, ETC.::
,_ ~ ~ ~ ~
~~ DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED
~~ ` ~~h°' ~ ~ f
°Ic" 9236' Set Whipstock
27. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: Production For
Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Calculated
24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
28. CORE DATA Conventi onal Core(s) Acqu ired? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarise lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None
Form 10-407 Revised 12/2009 ~ ~r'p CONTINUED ON REVERSE ~~MS FEB 18 1010 ubmitOrig/final Only
~~~~~
29. GEOLOGIC MARKERS (List all formations and ma encountered): 30. NATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate shcets to this form, ff needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Shublik 9216' 8389' None
Sadlerochit 9277' 8449'
Top CGL 9353' 8524'
Base CGL 9410' 8578'
23S6 9455' 8620'
22TS 9501' 8662'
21 TS /Zone 2A 9560' 8710'
Zone 1 B 9639' 8764'
Zone 1A 9800' 8804'
Formation at Total Depth (Name):
31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Wetl Schematic Diagram
32. I hereby certify that the foregoin is true and correct to the best of my knowledge.
aZ
l,7
Signed: Terrie Hubble Title: Technical Assistant Date:
PBU K-07D 204-242 309-355 Prepared ByNameMumber. Terrie Hubble, 564-4628
Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit. a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 12/2009 Submit Original Only
•
u
K-07D, Well History (Pre Rig Sidetrack)
Date Summary
9/4/2009 WELL S/I ON ARRIVAL. PULL 4 1/2" XX PLUG FROM 1997' SLM / 2014' MD. WELL LEFT S/I ON
DEPARTURE, DSO NOTIFIED.
9/20/2009 WELL S/I ON ARRIVAL. DRIFT TBG TO LINER TOP PKR Q 9255' SLM / 9265' MD, W/ 3.70" x 20' DMY
WHIPSTOCK. WELL LEFT S/1, NOTIFY DSO.
11/27/2009 WELL SHUT-IN UPON ARRIVAL. INITIAL T/IA/OA: 230/70/0. _SET BAKER 3.625" X 4.5" MONO-BORE
KB WHIPSTOCK AT 9236' TOP OF WHIPSTOCK WITH 2 RA TAGS ~9' BELOW TOP OF WHIPSTOCK
AT 9245'. SET WHIPSTOCK 24 DEGREES LEFT OF HIGH SIDE. WELL LEFT SHUT IN ON
DEPARTURE. FINAL T/I/O 250/70/0 JOB COMPLETE.
12/2/2009 T/I/0= 300/70/0 MITT 1000 psi (PRE CTD) Load TBG with 10 bbls dead crude. (MITxT to 1000 Psi)
Passed. Test # 1 Failed /Test # 2 Passed. TBG lost 0 Psi in 1st 15 Min and 0 Psi in 2nd 15 Min for a
total loss of 0 Psi in 30 min. Bled TBG press. back to 300 Psi. RDMO. FWHP= 300/70/0
12/10/2009 T/I/O = 240/10/0+. Temp = SI. Bleed WHPs to 0 psi (pre CTD). No AL line. T FL C«~ surface. Bled TP to
0 psi in 7 hours 30 min. Bled IAP, OAP to 0 psi in 2 min. Monitored IA, OA pressures for 7 hours, TP for
30 min. TP increased 10 psi, IAP, & OAP unchanged. Final WHPs = 10/0/0.
12/11/2009 T/I/0= 40/5/0. Temp= SI. WHPs (CTD). No AL. TP increased 30 psi, IAP increased 5 psi, OAP
unchanged overnight.
12/26/2009 T/I/O = 60/5NAC. Temp = SI. Bleed WHPs to 0 psi (pre CTD). No AL. Tbg FL near surface. IA FL ~
surface. OA FL near surface. Bled TP from 60 psi to 0 psi in 20 mins. Bled IAP from 5 psi to 0 psi in 1
min. Monitored for 15 mins. TP increased 4 psi. Final WHPs = 4/0/0. Job complete.
12/28/2009 T/I/O=SSV/0+/0. Temp=Sl. WHPs post bleed to 0 psi (pre-CTD). No AL. IA & OA were unchanged.
Unable to get TP due to well being safed out.
12/29/2009 Pressure test and greased tree.
Page 1 of 1
•
BP EXPLORATION
Operations Summary. Report
Page 1 ~a ~
Legal Well Name: K-07
Common Well Name: K-07 Spud Date: 1/1/1990
Event Name: REENTER+COMPLETE Start: 1/30/2010 End: 2/10/2010
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Task .Code NPT Phase Description of Operations
2/2/2010 11:00 - 11:00 24.00 MOB N WAIT PRE RIG WAS RELEASDED FROM 18-30A AT 11:00.
11:00 - 15:10 4.171 MOB N WAIT ~ PRE
15:10 - 18:00 2.83 MOB N WAIT PRE
18:00 - 18:45 0.75 MOB N PRE
18:45 - 00:00 5.25 MOB N PRE
2/3/2010 100:00 - 06:00 I 6.001 MOB I N I WAIT I PRE
06:00 - 06:15 0.25 MOB N WAIT PRE
06:15 - 06:16 0.02 MOB N WAIT PRE
06:16 - 18:00 11.73 MOB N WAIT PRE
18:00 - 18:30 0.50 MOB N WAIT. PRE
18:30 - 21:20 2.83 MOB N WAIT PRE
21:20 - 22:30 1.171 MOB P PRE
22:30 - 00:00 1.501 MOB P PRE
2/4/2010 00:00 - 00:25 0.42 MOB P PRE
00:25 - 09:00 8.58 MOB P PRE
09:00 - 10:00 1.00 RIGU P PRE
10:00 - 12:30 2.50 BOPSU P PRE
12:30 - 23:00 10.50 BOPSU P PRE
23:00 - 00:00 I 1.001 BOPSUR N I RREP I PRE
RIG WAS PUT ON STANDBY WITH CREWS DUE TO
PHASE 2 WEATHER AND CONDITIONS ARE EXPECTED
TO GO TO PHASE 3. WE WILL NOT BACK OFF THIS WELL
UNTILL CONDITIONS ARE IMPROVING.
WHILE WAITING ON WEATHER IN PHASE 2 CONDITIONS:
SLB INSTALLED THE REEL STAND GAURDS.
NORDIC IS INSTALLING NEW REEL HOUSE HARDLINE
FILTER MANIFOLD.
PHASE 3 HAS BEEN CALLED ALL NON ESSENTIAL WORK
HAS BEEN STOPED.
CALLED IMT &RECIEVED AUTHORIZATION TO CREW
CHANGE WITH LOADER
PHASE 3
CONDUCTED SAFETY MEETING WITH CREW &
EXPLAINED PRECAUTIONS ASSOCIATED WITH PHASE 3
HELD TABLE TOP SAFETY MEETINGS FOR FIRE DRILL,
CONFINED SPACE ENTRY, & MAN DOWN DRILL
PHASE 3 WAITING ON WEATHER
WEATHER CLEARED UP ~ 03:00 RECIEVED PERMISSION
FROM IMT TO REMOVE SNOW BUILD UP ON PAD
CREW CHANGE AND WALK ABOUNDS
06:15 PHASE CONDITIONS HAVE BEEN LIFTED FROM
PHASE 3 TO PHASE 2 LEVEL 3 ALL TRAVEL ON PADS AND
ACCESS ROADS REQUIRES APPROVAL FROM THE "IMT".
START MAKING ROUNDS AND DIGGING OUT
DIG OUT RIG & SAT CAMP LOAD REST OF LOOSE
EQUIPMET ONTO TRAILORS
MU HP FILTER SCREEN IN REELHOUSE
WAIT FOR ROADS & PADS TO CLEAR K-PAD ACCESS
ROAD FOR RIG MOVE
CREW CHANGE OUT
WAIT ON TRUCKS TO MOVE SATTELITE OFFICE TO
K-PAD
CH2MHILL ON LOCATION TO MOVE SATELITE OFFICE TO
K-PAD
WAIT ON CH2MHILL TO CONDUCT ROUTE DRIVE
SATELITE CAMP OFF LOCATION & HEADED TO K-PAD
WAIT ON SECURITY TO ESCORT OFFICE CAMP TO K-PAD
SECURITY BACK ON SITE ~ 00:00 HOURS
RELEASE RIG ~ MIDNITE
PJSM WITH RIG CREW & SECURITY FOR RIG MOVE
MOVE RIG FROM DS-18 TO K-PAD
SPOT RIG OVER WELL
ACCEPT RIG ~ 10:00
NU BOPE
PT BOPE
# 12 VALVE ON THE CHOKE MANIFOLD LEAKING OFF PSI
NEW ANNULAR BAG UNABLE TO HOLD PSI
BLIND RAMS FAILED PT
VBR FAILED PT
TROUBLE SHOOT & REPAIR LEAKING COMPONENTS ON
Fnntetl: znoizuto s:5s:za rnn
•
BP EXPLORATION
-Operations Summary Report
Legal Well Name: K-07
Common Well Name: K-07
Event Name: REENTER+COMPLETE Start:
Contractor Name: .Rig Release:
Rig Name: Rig Number:
Date From - To Hours Task Code NPT Phase
2/4/2010 23:00 - 00:00 1.00 BOPSU N RREP PRE
2/5/2010 00:00 - 06:00 6.00 BOPSU N RREP PRE
06:00 - 12:00 6.00 BOPSU N RREP PRE
12:00 - 13:00 1.00 BOPSU N RREP PRE
13:00 - 16:00 3.00 BOPSU N RREP PRE
16:00 - 19:30 3.50 BOPSU N RREP PRE
19:30 - 20:30 1.00 BOPSU N RREP PRE
20:30 - 00:00 3.50 BOPSU N RREP PRE
2/6/2010 00:00 - 02:30 2.50 BOPSU N RREP PRE
02:30 - 03:05 0.58 BOPSU P PRE
03:05 - 03:20 0.25 RIGU P PRE
03:20 - 03:45 0.42 RIGU P PRE
03:45 - 04:00 0.25 RIGU P PRE
04:00 - 05:15 1.25 RIGU P PRE
05:15 - 05:40 0.421 RIGU I P ~ PRE
05:40 - I 0.001 RIGU I P I I PRE
06:40 - 06:50 0.17 RIGU P PRE
06:50 - 07:30 0.67 RIGU P PRE
07:30 - 08:00 0.50 RIGU P PRE
08:00 - 08:20 0.33 RIGU P PRE
08:20 - 09:00 0.67 RIGU P PRE
09:00 - 10:30 1.50 RIGU P PRE
10:30 - 11:15 0.75 RIGU P PRE
11:15 - 11:30 0.25 RIGU P PRE
11:30 - 12:45 1.25 RIGU P PRE
12:45 - 17:15 4.50 RIGU P PRE
1 /30/2010
Page 2
Spud Date: 1 /1 /1990
End: 2/10/2010
Description of Operations
BOPE
TROUBLE SHOOT & REPAIR LEAKING COMPONENTS OF
BOPE
CONTINUE TO TROUBLESHOOT FAILED BOPE TEST
CALL AOGCC REPRESENTATIVE JEFF JONES TO
WITNESS BOPE TEST
BEGIN RE-TESTING BOPE
TROUBLE SHHOT & REPAIR FAULTY COMPONENTS ON
BOPE
CALL AOGCC REPRESENTATIVE JEFF JONES TO
WITNESS BOPE TEST
PT FAILED BOPE COMPONENTS ,
TEST HIGH & LOW LEVEL ALARMS IN PITS
PT FAILED BOPE COMPONENTS
PT OF ROPE COMPLETE
PJSM TO RIG FLOOR DOWN FROM ROPE TEST WHILE
TESTING BOPE
RD FLOOR FROM BOPE TEST
PJSM TO OPEN SSV & INSTALL FUSABLE CAP
STAB COIL INTO INJECTOROPEN SSV & INSTALL
FUSABLE CAP
PJSM TO PULL COIL ACROSS & STAB INTO INJECTOR
PULL COIL ACROSS & STAB INTO INJECTOR
CUT OFF GRAPPLE & DRESS COIL END
BOOT E-LINE
STAB INJECTOR
CHECK CONNECTIONS ON HARDLINE IN REEL HOUSE
FLUID PACK COIL WITH 5 BBLS MEOH, FOLLOWED BY 5
BBLS FRESH WATER
PT NEW HP FILTER SYSTEM TO 4,200 PSI
FOUND SOME LEAKING CONNECTIONS
BLED OFF PSI & TIGHTENED CONNECTIONS
PT TO 4,200 PSI
PRESSURE LEAKING OFF
TROUBLE SHOOT PSI LOSS
PJSM FOR CHECKING INJECTOR CHAIN BLOCKS.
BEGIN INSPECTING INJECTOR GRIPPER BLOCKS AFTER
FOLLOW UP FROM NORDIC 2 BLOCK FAILURE
TEST CTD PIT ALARMS AND ELECTRONIC PRESSURE
GAUGES. PT ALL TREATING IRON AND CT
PJSM WITH RIG CREW FOR PUMPING SLACK AND
INSTALLING COIL CONNECTOR
PUMP ELINE SLACK MANAGEMENT AND HEAR ELINE
"ZING". CUT 15' COIL TO FIND ELINE
MEG ELINE AND TROUBLESHOOT COMMUNICATION
ISSUES
INSTALL COIL CONNECTOR AND PREP TO PUMP 3/4"
BALL FOR DRIFT OF COIL
PJSM FOR LOTO AND DROPPING 3/4" BALL INSIDE REEL
PUMP AND RECOVER 3/4" BALL FOR SUCCESSFUL DRIFT
OF COIL
INSTALL BAKER UOC AND TEST. TEST FAILED, BEGIN TO
TROUBLE SHOOT. RE-HEAD BAKER CONNECTOR AND
Printed: 2/10/2010 3:58:28 PM
BP EXPLORATION. Page'3 ~
Operations Summary Report
Legal Well Name: K-07
Common Well Name: K-07 Spud Date: 1/1/1990
Event Name: REENTER+COMPLETE Start: 1/30/2010 End: 2/10/2010
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
2/6/2010 12:45 - 17:15 4.50 RIGU P PRE SUCCESSFULLY TEST.
17:15 - 20:45 3.50 RIGU N RREP PRE PRESSURE TEST INNER REEL VALVE
PSI LEAKING OFF FROM PRESSURE BULKHEAD
TROUBLE SHOOT & REPAIR PRESSURE BULKHEAD
OBTAINED GOOD PELIMINARY PT
20:45 - 22:00 1.25 RIGU N PRE CALLED JEFF WITH AOGCC
WAIT ON STATE REP.
22:00 - 23:10 1.17 RIGU P PRE PT & CHART INNER REEL VALVE WITH JEFF JONES
FROM AOGCC AS A WITNESS
STAB ONTO WELL & TEST FLOW RATE ALARM
23:10 - 23:45 0.58 RIGU P PRE RD FLOOR FROM PRESSURE TEST
23:45 - 00:00 0.25 STWHIP P WEXIT PJSM TO PU &RIH WITH MILLING BHA
2/7/2010 00:00 - 01:10 1.17 STWHIP P WEXIT MU WINDOW MILLING BHA
STAB INJECTOR
01:10 - 03:20 2.17 STWHIP P WEXIT TEST TOOLS ~ SURFACE
OPEN EDC
RIH ~ 2 BPM FRESH WATER & 90 FPM
STACKED WT ON GLM Q 7,836'
RIH TO 9,120'
03:20 - 04:00 0.67 STWHIP P WEXIT LOG TIE IN
-9.5' CORRECTION, RESET DEPTH TO 9,179
04:00 - 04:15 0.25 STWHIP P WEXIT RIH TO TOWS
TAG C~3 9,233'
PU TO 9,218' & CLOSE EDC
FINISH DISPLACEMENT OF CRUDE WITH FRESH WATER
FOLLOWED BY GEO-VIS
04:15 - :20 14.08 STWHIP P WEXIT RIH TO TOWS
FS 2,300PSI ~ 2.5 BPM
YY
'il'~7 E START MILLING FROM 9,232.4' ~ 1 FT/HR
04:20 - 9,232.4' - 100 PSI MTR WK
05:40 - 9,233.8' - 400 PSI MTR WK
06:35 - 9,234.6' - 400 PSI MTR WK
07:00 - 9,234.8' - 500 PSI MTR WK
09:00 - 9,236.4' - 340 PSI MTR WK
10:00 - 9,237.3' - 230 PSI MTR W K
13:00 - 9,240.4' - 390 PSI MTR W K
15:00 - 9,241.6' - 400 PSI MTR WK. 1.2K WOB. BEGIN TO
LOOK FOR FORMATION SAND IN RETURNS. NO
15:45 - 9,242.2' - 380 PSI MTR WK, iK WOB. SHUBLIK
LIMESTONE IN CUTTINGS. INCREASE ROP TO 2-3 FPH.
16:50 - 9,244.8' - 400 PSI MTR WK, 1.2K WOB.
18:20 - 9,250' -MILLED 10' OF RATHOLE. BACK REAM
THROUGH WINDOW
18:20 - 21:55 3.58 STWHIP P WEXIT MAKE 3 CLEANOUT RUNS THROUGH WINDOW TO
INSURE IT'S CLEAN
SHUT OFF PUMPS & RUN THROUGH WINDOW, SMOOTH
PU TO 9,212' & OPEN EDC
21:55 - 23:45 1.83 STWHIP P WEXIT POH WITH MILLING BHA
PJSM TO LD MILLING BHA WHILE POH
23:45 - 00:00 0.25 STWHIP P WEXIT LD MILLING BHA
2/8/2010 00:00 - 00:15 0.25 STWHIP P WEXIT LD MILLING BHA
MILL & STRING REAMER IN GAUGE
00:15 - 00:30 0.25 STWHIP P WEXIT PJSM TO CHECK HP FILTER SCREENS IN REEL HOUSE
Printed: 2/10/2010 3:58:28 PM
TREE= 6" McEVOY
WELLHEAD= McEVOY
ACTUATOR = OTIS
KB. ELEV - 54.66'
BF. ELEV = 27.91'
KOP= 9325'
Max Angle = 98° ~ 11585'
Datum MD = 9854'
Datum N D = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347" ~-~ 2709'
PRE SDTRK W ELLBORE (K-0 B 8~ K-07C)
Proposed CTD Sidetrack NOT SHOWN ON THIS DIA(~2AM.
Minimum ID = 2.30" a~ 9'170'
T{}, 3"••
TOP OF7'LNR 6$09' ~~~
TOP OF WHIPSTOCK ~-~ 6992'
4-1/2" TBG, 12.6, L-80, .0152 bpf, ID= 3.958" 9039'
~7" LNR, 26#, L-80 BTC, .0383 bpf, ID = 6.276" ~~ 9189'
MONOBORE PKR WHIPSTOCK I-1 92$8'
9265' 4-1 /2" KB PKR, ID = 2.39"
4-1/2" LNR, 12.6#, L-80 IBC, .0152 bpf, ID= 3.958" 9325`
MECHANICAL HOLLOW WS 9327'
RA MARKER 9329'
2014' ~4-1/2" HES X NIP, ID=3.813"
2604' 9-5/8" DV COLLAR
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
4 3295 3238 11 MMG-M DMY RK 0 07/24/09
3 6012 5501 42 MMG-M DMY RK 0 07/24/09
2 7836 6982 17 KBG-2LS DMY INT 0 12/06/99
1 8888 8009 8 KBG-2LS DMY INT 0 12/06/99
6$09' ~--~ 9-518" X 7" BKR ZXP PKR w / TIEBK SLV, ID =6.313"
6816' 19-518" X 7" BKR HMC HGR, ID =6.250"
MILLOUT WINDOW (K-07C) 6992' - 7008' I
$997' 4-112" HES X NIP, ID = 3.813"
9011' 7" X 4-1 /2" HES TNT PKR, ID = 3.875"
9028' 4-1/2" HES XN NIRMILLED OUT 07/21/05, ID = 3.80
9036' 7" x 5" BKR ZXP PKR, ID = 4.375"
9040' 4-1/2" WLEG, ID= 3.958"
9050' 7" x 5" BKR HMC HGR, ID = 4.375"
JQ5$' S" x 4.5" XO, ID = 4.000"
DATE REV BY COMMENTS DATE REV BY COMMENTS
12!05/83 ORIGINAL COM PLETION 12/17/07 TFA/SV GLV GO
12/06/99 RIG SIDETRACK (K-07C) 06/28/09 ACB/TLH GLV GO
01/21/05 NORDIC i CTD (K-07D) 07!24!09 CJN/PJC GLV GO (07/24/09)
05/29/06 CO/DTM PERF/TREE CORRECT (6/13/04) 09/01/09 MSE PROPOSED CTD SIDETRACK
09/27/06 ?/PJC DRLG DRAFTCORRECTION
05/28/07 JAF/PJC DRLG DRAFTCORRECTION
T ~ {~~
PRUDHOE BAY UNR
WELL: K-07E
PERMff No:
API No: 50-029-21045-05
SEC 4, T11 N, R14E, 2041' SNL & 473' EWL
BP Exploration (Alaska)
~
•
~ ~ ~ ~ ~ ~vs f t ~' yy pn ~ ~ +~€~' /tp w c p5(A~p §~;~& y~
~ ~ ~ h ~ ~ ~ tl p ~e 9L ~ ~ ~ ~ ~F" ~ ~ M~~ t ~/~ ~~,C~~~. ~~~
~ ~~, 3 t A 4 N P~ tl t.~~ A„ ~ ~~ ~
~ ~ ~ ~~ ~ ~ ~ ' ~ ~ ~ ~ ~ ~ ~ ~ H ~? ~ a ~ F ~, ~ ~~ ~ ~~ ~ ~ ~ ~ SEAN PARNELL, GOVERNOR
~~ ~~ ~ k ~ ~. ~ ~ C~. ~ , ~ ~~ ~~ ~9 gN~ ~.
~_:~ ~_, r F' ~ ~.~C ~_~,~ ~ ~. ~5. 9~ r ~
~
~S~ ~IL tu~is ~ ;~ 333 W. 7th AVENUE, SUITE 100
CO1~T5EIiQATIOI~T COA~'IISSIO~T ~% ANCHORAGE, ALASKA 99501-3539
~~ PHONE (907) 279-1433
~ ~ FAX (907) 276-7542
Mr. John Mc Mullen
Engineering Team Leader
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612 _ ~_M ~'
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K-07D
Sundry Number: 309-355
`°`'~~:~~8~~~' '^~~'`:i ~ ~~~~ 2~i~~
~
Dear Mr. Mc Mullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such fizrther time as the Commission grants for good cause
shown, a person affected by it may f~le with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
~ Chair
DATED this~ day of October, 2009
Enc1.
STATE OF ALASKA
i~~ ~?j~'~A~LAS~IL AND GAS CONSERVATION COMMI N
,~o i~ ~
~`
~p APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request: --
~~Fhorage
~
~ Abandon
^ Suspend ^ Operational Shutdown ^ Perforate ^ Re-Enter Suspended
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other Specify:
^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Time Extension
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ~ Development~ ^ Exploratory 204-242 '
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21045-04-00 '
7. If perForating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: pBU K-07D -
Spacing Exception Required? ^ Yes ~ NO
9. Property Designation: 10. Field / Pool(s): ,
ADL 028303 & 028300 Prudhoe Bay Field / Prudhoe Bay Oil Pool
1 L PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11901 - 8729 - 11901 , 8729 ` None None
Caain Len th Size MD ND Burst Colla
Structural
Conductor ~ 1 " " 19 11
Surface 27 9' 1-/8" 270 ' 2709' S3 2 7
Intermediate 92' 9-5/8" 2' 279' 87 476
Production
~iner 3' 7" 80 '- 918 ' 6139' - 2' 7 4 10
Liner 2 0' 4-1/2" 9036' - 1' 21 '- 8488' 84 7500
Liner ' 3-1/2" x 3-3/16" x 2-7/8" '- 11 1' '- 72 '
PerForation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
Slotted Liner: 10436' -11900' 8791' - 8729' 4-1/2", 12.6# L-80 9040'
Packers and SSSV Type: 7" x 4-1 /2" HES TNT packer Packers and SSSV 9011' / 8185'
MD (ft) and ND (ft):
12. Attachments: 13. Well Class after proposed work:
~ Description Summary of Proposal ^ BOP Sketch
^ Exploratory ~ Development ^ Service
^ Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: December 15, 2009 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ~ Abandoned
16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG
Commission Representative:
17. 1 hereby certify that the foregoing is true and corred to the best of my knowledge. Contact Cod Hinchman 564-4468
Printed Name J n McMullen Title Engineering Team Leader
Prepared By Name/Number:
Signature5,,-y~""' Phone 564-4711 Date /~J j~( ,~ Terrie Hubble, 564-4628
Commission Use Onl
Conditions of approval: No ' Commission so that a representative may witness y~"~
_~~
Sundry Number:
/
^ Plug Integrity OP Test ^ Mechanical Integrity Test ^ Location Clearance
~,~ a~C~ 1~ ~-S C, ~C~ P l~s 7~`
Other:
-~ ~ ~v ~ ~ ~° ~n~,,,,[~,~ ~ .t- C,.~:~..)
Subsequent Form Required:
`'j ~'~
/ •
APPROVED BY /~ J3~ ~
Approved By: CO !S NER THE COMMISSfON Date ~
~~,~EIV~C~o~
OCT 2 A ~Q~~
JOD
Form 10-403 Revised 07/2000 ~ ~ I I~~ / Submit In Duplieate
1 1 ( ~~ ~
;'...1 " ~s1_ ~o• '~,'~j. p~
~.~ R G N A L
• •
To: Tom Maunder
Petroleum Engineer ~
Alaska Oil & Gas Conservation Commission ~
From: Cody Hinchman
CTD Engineer
Date: October 15, 2009
Re: K-07E Sundry Approval
Sundry approval is requested for K-07D. As a result of high GOR, K-07D has had no significant on-time since
it was drilled in 2005.
Well History:
K-07D was drilled in January 2005 as a CTD sidetrack targeting Z1 A sands. It was a bonsai completion with
slotted liner below 10,436' MD. As a result of the liner failing a pressure test, a KB LTP was set. Production
started at 30k GOR and exceeded MGOR within two weeks. It healed to 40k after a month SI and stayed on for
a week after being returned to production. Since then the well has had virtually no on-time and has been utilized
as a swing well.
Diagnostic SCMT/CNUTemp logs were run on 6/17/05. The SCMT showed cement form 10,300' to 9476'. The
updated GOC from the CNL was 9683' MD (8730' tvdss) leaving ~20' LOC. The temp log was run shortly after
the well was SI and there was no clear indication of gas entry from the residual temp profile. A STP was run on
1/28/06 over the LTP interval to rule oui the possibility of an LTP leak. The STP showed no indication of a LTP
leak.
The gas influx was then suspected to be from either thin LOC or a faulUfracture matrix from a huge boundary
fault to the North. An STP was run on 9/05/07 to help determine the gas source and found the majority of gas
coming in at the top of the slotted liner at 10,436' MD and at the bonsai baffle plate at 10,340'. Due to having a
good cement job, it is not suspected we are connected up with the gas cap but rather that we have no cement
between the reservoir and the bonsai baffle plate. Also, it seems the majority of production from the well is
flowing outside the slotted liner and entering at 10,436' MD.
Due to its low value, K-07D has been screened for CST multiple times, including 2007 and 2009. A calliper run
on 12/14/07 showed the tubing and liner to be in good condition with no significant areas of cross sectional wall
loss. On 7/23/09, an MIT-IA and MIT-OA passed to 3000 psi and 2000 psi respectively. A packoff test of the
tubing and inner casing both passed and all LDS were torqued and cycled.
Reason for Sundry:
At current operating conditions K-07D is uncompetitive and has had no significant on-time since it was drilled in
2005 due to high GORs. There has been no direct evidence to indicate why this well had early gas
breakthrough. Over the past year, it has been on-line only 3% of the time and looks to receive no on-time in the
coming years. Due to this well being a slotted liner completion with no way to single out the gas source and shut
it off, this well is ready to be sidetracked, ~~ ~~, ~~y ~;'q~ i~ ~'Q
~,`j~ed , o a n ew f vc~t
Pre-Rig Work Summary: (The pre CTD work is slated to begin about December 15, 2009.) ~ r Q
1. PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi. ~.~ qt'"r~~~ ~~ ~~ ~
2. MIT-IA to 3000 psi, OA to 2000 psi. rn r~+e ~'~ .~e ~tf Of )~jy~
3. Function LDS ~R~ '`~,e / ~ ~~ ~t~ii
4. PPPOT-T
5. Dummy all GLM's
6. Drift with dummy 4-1/2" whipstock and tag PKR at 9265'
7. Set 4-1 /2" packer whipstock with top at 9,230'.
8. PT packer whipstock to 1000 psi.
9. Bleed T, IA, gas lift and production flowlines down to zero and blind flange.
10. Remove S-Riser, Remove wellhouse, level pad.
Rig Sidetrack Operations: (Scheduled to begin on January 15, 2010 using Nordic rig 1)
1. MIRU Nordic Rig 1
2. NU_7-1/16" CT Drillina BOPE and test.
3. Mill a 3.80" window at 9230'.
4. Drill build/turn section of the K-07E lateral with 4.125" bicenter bit and land well.
D~
~r~ ~C
~`~Pr ~/fi~ ~n-' ,~c~ ~
a ~~~re~ P~~ ~ ~ ~d/~~ ~
~
SW "-~
~ ~~ ~,35 s
5. Drill lateral section to 10,368' MD~ ~
6. Run and cement a 3-3/16" x 2-7/8" solid liner string. (12.6 bbls of cement)
7. Make a cleanout run with mill and motor.
8. Make a logging run with a SWS GR-CNL logging tool.
9. Test liner lap to 2000 psi.
10. Set ~TP.
11. Make a perforating run with 2.0" OD perf guns.
12. Circulate well to KWF brine. FP well to 2000' with diesel.
13. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
14. RDMO Nordic 1.
Post-Rig Work:
1. V Pull BPV.
2. O Re-install well house and FLs
3. S Run gas lift design.
4. T Flow test well (100' of perfs).
Cody Hinchman
CTD Engineer
CC: Well File
Sondra StewmanlTerrie Hubble
I
, ~ ~
' ~ ~
I ~• ~
~~ s O
J4TOR = -
iEV =
__.__....._.___..._.
LEY =
_.__..__..___..._..._
a
......»... ;
~ ..» ~...
n IYq =
..._._._....._._._.__._.
fl TYD =
133/8" CS4, 72#, L•~, ID a 12.347" ~--~ $~'
K-07 D
Mtni~n un~ ID s Z.30" ~ 10337'
8KR O RNO ~UB (lYqll~D D1~'1910Sj
TOP OF T lMR ~09'
TOP OF WHIPSTOCK H ~2'
~4112" T84. 12.Ci~. L-~, .0152 bPf, l1 s 3.868' ~
I7" LNR. ~f. 1-80 BTC. .Q389 bpf. D a 0278" I--~ 97~I'
AdECHAN~AL NOLLOW WS ~IT
t~. .~'1 _ ~.~.
.r,....,..
PEltFORATION SlJMMARY
REF L00: NA
,~lJC9LE AT TOP P~2F. 93 Q 104~'
Nots: Re~er to ProduCiion DB for his~ar'iCal Brf de~Rs
SI,~E SPF N~R~tVAL DATE
PRE-DRII.IED 10436 • 11900 0 01l21~
~E~~~Si: ~LL ~.E 'J ~ ~ ~~~.
Pl~' K-QlE! ~OTNK ~L18~ IK'aTB ~ It~G
MflT ~ OY 1{Nt ffliisiii~
(41P2' FiES X IH~'. D= 3,~13" ~
9~'SA~" DV C041AR
7 I~ I s~ I 18 ( KBC~-21S ~ DAA'f I~IT ( 0 I 12~UBf'99
S~SAB" X T' ~KR ZXP PKR w! T~BFC SLV. ~~.313"
~~~' 9~5A" X7" iKR HNG M4R, D^6.250"
I M~.LQUT VYIJDONl~t7C~ 6~2' - 70~' '
~..~..
~~' 41t2" HES X NIP. ID ^ 3.813'
~11' 7" X 41f2' HE~ Tk1T MCR. ~^ 3.87'S"
~ 41/2° HffS XM NR I~Nt.LED OUT 01C11~. ID ~ 3.80
~ T x 5' !KR ZXr RKR, ~= 4.375"
~ 4~ 112" YYLEO, D~ 3.~
~ 1" x 3" 0W1 HI1~ HOR ID s 4.37~3"
~' 41/7' KO rlCN. D= 2~"
927~' 31C2" DEPk.OY SLV, ID = 3.f1D"
92/~' 3-1IY OT~ Xli NIPwlRA TA6, ID ~ 2.04
~' 3-1/2" X 33l14' XQ, ~+ 2.78d"
MLLOUl' V-INDC)NV p~iiD~ 9:325' - 9330~
\ .r.~.~ .+~ w ~
13•3t9d" X 2-7/8" X0. ~= 2.377" I
rero 10T34"
412' LNR,13.~. L8019C, .013Y b-t. ID s 3.~" 10~6'
3-3f1~ LNt. 0.2+/. L-80 TC4 .t9A~E bpf. ~ a 2~1" ~~~'
2•7i8" LNl1. 0.1Qa1. L•80 STL .005! Ynf. p~ 2.44i"
DA~TE REY BY COMMENTS DATE RLV BY COMI~NTS
72116i7 Oi~6wAL CO~PlET10r t2I17bT TFA15V OLV C~0
~z~~r ~~rw~cu oerzeas ac~r~ aYv c~o
Mi!'!~ It CTD QTf24i09 CJPNPJC (~t.YCp Q7+24~)
osrls,os co~orM ~rr~ cc~cr ~sn s,v~~
O9I~7J06 7l~JC DRLC~ DRAFT CORF~CTION
05I28A7 JAJ~IDJC t3 DRAFT CORRECTlON
PfiUDMUL BAY UVT
YV~.L; K-07D
PERMT No: ~1042420
API rb: Sa-029-210~i5-04
T11 N, R14E, 2041' SI$. 8 473' I
r ir~urrrrr~r~.n.r~r.
~~b~
. .
7REE ~ 6' MtfVOY
YvELItEAD =
.._._.. ....................._... Ie~EVOY
ACTIWTOR ~
__.____..... OTIS
I(B. EIFV =
.._... 54.66'
___.....
BF. ELEV =
_ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27.91'
. . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . .
NOP =
..
.
.
..
....
_
...
..._... 9325
_..
.
_..
.
..
.
._.
.
....
.
..
.
..
.
.
Max ar~le =.. ...
.
.
...
.
.
.
......
_98' ~ ~ ~ sES.
....._.. _
Datum b0 =
.
...
. 9654~
.
.
.
._
_._._..___.
_
._..
_
'Datum ND = _..
...__.
_
.._
_.__
8~0' SS
K-~7E
Proposed CTD Sidetrack
13-3/8" CSO, 72#, L-80, D^ 12.347" ~ ~' ~~
Minim um ID = 2.30" ~ 9170'
TOL 3.5"
TOP Of T LHR W~' 4~
TOP OF WHPSTOCK ~~
TBG, 12.6~F. L•80..01d2 bDf, D=3.958' I-~ 9079'
IT LNR. 2GN, L-80 BTC. .038:3 DDf. D~ 6276" I
IMONOBORE PKR WHIPSTOCb: I
P~FORATION SIM~IARY
Rff L0C3: NA
AtrOLE AT TOP PB~F: xx (~ x~ocx'
Note: Refer to Production DB ta histaical perf data
SIZE SPF INTERVAL OpNSqz DATE
s~nrNO~s:~u a~, ~r e 9~00~.
~- ~om soTrKwa~BO~ p4o~e a K.olq
~[1T i{~~I (1M T1NC Illi[7i1~
41Q" HE5 X NP, D= 3813'
&5R" DV COLLAR
ST MD TVD DEV TYPE VLV LATCH PORT DATE
3295 3236 11 NMG-M DMY RK 0 O7r24~D9
3 6012 5501 42 M#G-M DMY RI( 0 0724A9
2 7836 6~2 17 KBG-2LS DMY NT 0 12J06199
1 8888 80~ 8 I(BG-2LS DMY M 0 12iD6199
6~' 9~518" X 7" BIQt ZXP PKR w 1 T~K SLV, D~E.313"
6i16 ~-'Sf8" X 7" BKR NI~C H4R, D=8250"
MLLOUT IM~D01NpNiq 6997 - 7008'
899T 41f2' NES X NIP, D= 3.813"
9011~ T X 412' HES TNT PKR, D= 3.875"
9~' 412" HESXN NP•A~LED OUT01r21A5, D=3.80
90~' 7" x 5" BKR ZxP PIiR, D^ 4.375"
~~' 41FY' W LEG. D= 3.fl58"
~' Tx5"BKRHMCHGR,D=4.375"
9058~ 5" x 4.9' X0, ID = 4.000"
91b0' 4-1 f~" I~ PKR, ID = 2.563" TSGR 9160~
91i0' 3-1r2° CEPLOY SLV, ID=230"
?? 3-1 C1" i( 3-3M fi" }(0, ID = ~'.i ~96"
6°
9Z65' ~1 /2' KB PKR D= 2.38"
-9800' 3-3M 6" }( 2-7+8" H0, ID = 2.377"
~-~ rr u+rc, ~ ~.or, ~-ou en., .~n a~ op~, u~ ~.~r- ~-y ~sa I ~
MECHANICAL HOLLOW WS ~T
RA MARI(~t -~
3-3/1d" LPlR.c.?~, L-80 T~:f 0"'c :• I"= ;:i" 77
1,41_LC i ,,;,~~~„=,~~~d jtt-A~D~ ~ ; _ q_ ,~~, , _,_, - ~ ,~-,f, IG = 2 441" 10368'
DATE REV 8Y COMrENTS DATE REV BY COI~AENTS
12A6~] O~H. m1~LET10N 12117A7 TFA15V GLV CA
72AN! !rG i~ETNACK • O6lIBA9 ACBlTLN GLY CA
01Q7~5 1 CTD -~ 07!'24109 C,1NiPJC GLV CA 07l24A9
OSl29A6 COATM PERF1fREE OORRECT (6h 3A4} 09A71 A9 AASE PROP06ED CTD SIDETRACK
09127A6 ?iPJC DRLG DRAFT CORRECTION
OSI28A7 JAFrPJC DRLG ORAFT CORRECTION
0
~
PRLDFIOE BAY LNT
1N~L: K-0lE
PERMAT No:
a,ai rio: so-oze-r~ as-o~
T11 N, R14E, 2041' SPL 8 473 I
~ E~or~tion (AMk~
• •
_~:=`_
.~ ~
03~0~~~00$
DO NC}T PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicl~e\CvrPgs_InsertstMicmfilm Marker.doc
09/28/07
~chf~mh~rg~r
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
~`L~~5Y3~~ 1Vt1~ ~ 4 2~~~
Well Job #
Len DPSr_rintion
NO, 4440
Company: State of Alaska
Alaska OiI & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Fie{d: Prudhoe Bay
Data BI Gnlnr CD
15-39A 11661174 MEMORY PROD PROFILE 09/23/07
W-42 11745235 MEM SBHPS/TEMP 09/14/07 1
Z-07A NIA SBHP SURVEY 09/14/07 1
A-04 11594519 SBHP SURVEY a - 08/26/07 1
Y-24 11630499 LDL 09/04/07 1
L5-28A 11855810 PRODUCTION PROFILE b 08/31/07 1
X-33 11849931 SBHP SURVEY r - ~fG 08/31/07 1
E-14A 11686784 LDL ~ ~ 09/23/07 1
01-15A 11855509 DDL ~ ~ a~ (~ 09/22/07 1
D-21 11626119 PRODUCTION PROFILE '~f~ - d 09!11!07 1
K-07D 11745234 MEM PROD PROFILE C - 09/06107 1
11-32 11630498 PRODUCTION PROFILE j ~ - 09/03/07 1
L-01 11745233 MEM LDL a () (- ~ 09/04107 1
07-30A 11661168 MEM STP & CORRELATION - 08128107 1
Z-28 11630500 INJECTION PROFILE 09105107 1
Z-16 N/A SBHPSlJEWELRY / 09/13/07 1
14-26 11676959 LDL ~/f 09/09107 1
04-02A 11630504 LDL I' - 09/11/07 1
14-37 11695075 LDL - 09/13/07 1
3-351E-36 11630502 PRODUCTION PROFILE 09/09/07 1
YLtAJt AI;RNVWLtUGt KtGt1Yl t3Y SIl3NING ANR KE~TUKNINty ONE DOPY EACH TO:
19
BP Exploration (Alaska) Inc. -
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 ~
~' _ ~R ~~~"i,3
v
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-28
ATTN: Beth
Received by:
~_J
•
)..0 ~
DATA SUBMITTAL COMPLIANCE REPORT
1/30/2007
Permit to Drill 2042420
Well Name/No. PRUDHOE BAY UNIT K-07D
---~-~-
MD 11901./" TVD 8729 /" Completion Date 1/20/2005
m_.._~___~..·~
---'--'~'--'-----'-----~
REQUIRED INFORMATION
Mud Log No
DATA INFORMATION
Types Electric or Other Logs Run: MWD GR / EWR, MGR I CCl / CNL
Well Log Information:
~
~ .e t,las
u(og
U C Lis
I
W
I
~._.---~-
Directional Survey
Directional Survey
Directional Survey
13286 Induction/Resistivity
13286 LIS Verification
13287 Induction/Resistivity
13287 LIS Verification
13509 Induction/Resistivity
13819 Spinner
13819 Spinner
Neutron
C\.(h, (;,.,\ C () ¡' j ~ tn- - t:I ~ > 5
N l~'fo ~-~
#- 138/7
13853 Neutron
Cement Evaluation
Operator BP EXPLORATION (ALASKA) INC
Completion Status 1-01l
..~ ---~~-
Current Status 1-01l
.. ---,---------
Samples No
---~-----
5¡Jv;¿ 6 J~,zo ðJ-
API No. 50-029-21045-04-00
UIC N
--~..._------_.
--,,-------------_.~--_.~--~.- .
Directional Survey Yes
~--""-'---~
--------.--"....--------
(data taken from logs Portion of Master Well Data Maint
Log Log Run Interval OH/
Scale Media No Start Stop CH
------.,---
0 11901 Open
0 11901 Open
9315 11875 Open
10151 11901 Open
9315 10845 Open
9199 11855 Open
9199 11855 Open
9199 10802 Open
9199 10802 Open
9333 11901 Open
Received
2/8/2005
2/8/2005
2/8/2005
5/4/2005
5/4/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
2/22/2006
5
9710 9080 Case
9710 9080 Case
9404 11895 Case 4/25/2006
Blu
2
Blu
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
~---DAsc ---------Eirectional Survey
, Rpt Directional Survey
ì
I Rpt
I.
~ D Asc
~ D Asc
..ø5 D Lis
,.-0'
t.R¡5t
li6 Ð Lis
At:
;;;t' C Lis
2
9404
11895 Case 4/25/2006
2
Col
9414
10510 Case 9/12/2006
e
Comments
IIFR
IIFR
MWD
IIFR
IIFR PB1
GR EWR4 ROP
GR EWR4 ROP
PB 1 GR EWR4 ROP
PB 1 GR EWR4 ROP
ROP NGP EWR plus
Graphics PB 1 ROP NGP
EWR 9333-10845 plus
Graphics
Press/GRlCCLIT emp/Spin
28 Jan 2006
Press/GRlCCllT emp/Spin
28 Jan 2006
MCNL & Temp Log
Memory
GRlCCUCNLlTemp 17-
Jun-2005
MCNl & Temp Log
Memory
GRlCCUCNLlTemp 17-
Jun-2005
Mem SCMT, PSP, GR,
CCl, SCMT 17-Jun-2005
.
Permit to Drill 2042420
DATA SUBMITTAL COMPLIANCE REPORT
1/30/2007
Well Name/No. PRUDHOE BAY UNIT K-07D
Operator BP EXPLORATION (ALASKA) INC
MD 11901
TVD 8729
~
I
ì
L
Completion Date 1/20/2005
Completion Status 1-01L
API No. 50-029-21045-04-00
Pressure
"~~-~-- -----~~---~_._-
13
Current Status 1-01L
UIC N
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? Y If!)
Chips Received? ,...:t..L..t:L-
Analysis 'U-N
Received?
---~--".'---
------.-..---....---.----
Comments:
._~_.
Compliance Reviewed By:
_.,_._-~._---_.._..__.__..~-~----~---_._--- -~-------------
9623 Case 9/12/2006 Static Bottom Hole Pres
Survey, PSPT-B 28-Nov-
2005
-~.~--~---~._~_._._....._.._~
Blu
-~~
Interval
Start Stop
Received
Sample
Set
Number Comments
Sent
Daily History Received?
ON
QIN
Formation Tops
._--_._-------~_._------~--
-------.---------,..---..------
~
Date:
----~._"-----._---_._._---_..-
--------.._------~--
f _ -;5.'}-..
\Q J tl1 ~Î----~
----".".-
.
.
Scbfumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
C-11A
B-25
F-06A
G-18A
P-24
B-28
B-01
W-39A
Z-02A
G-03A
C-26A
F-26B
F-26B
W-39A
F-04A
Y -08A
C-06B
X-27
K-07D
Y-1OA
F-12
K-07D
X-04
A-30A
17-04B
Z-30A
17-04B PB1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Job #
11225983
11217247
11258688
11209612
11216206
11221590
11211508
11216197
11212856
11211493
11225979
N/A
N/A
11216197
11221602
11221604
11212883
11217274
10942217
11209611
11225984
11058256
10919925
11054295
40010183
40010092
40010183
06"1 ~ dl.{ J
r(-O'7D
Log Description
Date
07/02/06
05/11/06
03/20/06
07/19/06
07/06/06
07/04/06
06/23/06
OS/29/06
05/02/06
OS/24/06
06/07/06
06/06/06
06/06/06
OS/29/06
08/18/06
08/20/06
08/15/06
08/26/06
06/15/05
07/18/06
07/02106
11/28/05
12/15/04
04/06/05
03/09/04
01/27/04
03/08/04
LDL
LDL
PROD PROFILE W/DEFT
MEM INJECTION PROFILE
MEM INJECTION PROFILE
LDL
PROD LOG W/DEFT
MEM PROD PROFILE
INJECTION PROFILE
LDL
LDL
MEM PROD & INJECTION
MEM BORAX LOG
MEM BORAX LOG
SCMT
SCMT
USIT
US IT
MEMORYSCMT
MEM INJECTION PROFILE
LDL
SBHP SURVEY
PROD PROFILE W/DEFT
CH EDIT OF PDC LOG W/GR
OH EDIT OF MWD/LWD (REDO OF TVD DATA)
OH EDIT OF MWD/LWD (REDO OF TVD DATA)
OH EDIT OF MWD/LWD
NO. 3941
Company:
R:-· r- .~",.,.. ~ ii' ~
.... .' ~".... -, ...' ~
"\, -~ '" r,.::;;
])
I., . ,
.'-'1.-: J. ~ ~'"'wo
08/28/06
~ (;11 & Gas Gens, CommiMtoo
Anchorage
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
Field: Prudhoe Bay
CD
1
1
2
.
1
1
1
1
1
.
1
1
1
1
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Schlum~e..ge..
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
C-11A
B-25
F-06A
G-18A
P-24
B·28
B-01
W-39A
Z-02A
G-03A
C-26A
F-26B
F-26B
W-39A
F-04A
Y-08A
C-068
X-27
K-07D
Y-1OA
F-12
K-07D
X-04
A-30A
17-04B
Z-30A
17-04B PB1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Job#
11225983
11217247
11258688
11209612
11216206
11221590
11211508
11216197
11212856
11211493
11225979
N/A
N/A
11216197
11221602
11221604
11212883
11217274
10942217
11209611
11225984
11058256
10919925
11054295
40010183
40010092
40010183
~Cf-I-d¿¡d
Log Description
Date
07/02/06
05/11/06
03/20/06
07/19/06
07/06/06
07/04/06
06/23/06
OS/29/06
05/02/06
OS/24/06
06/07/06
06/06/06
06/06/06
OS/29/06
08/18/06
08/20/06
08/15/06
08/26/06
06/15/05
07/18/06
07/02/06
11/28/05
12/15/04
04/06/05
03/09/04
01/27/04
03/08/04
LDL
LDL
PROD PROFILE W/DEFT
MEM INJECTION PROFILE
MEM INJECTION PROFILE
LDL
PROD LOG W/DEFT
MEM PROD PROFILE
INJECTION PROFILE
LDL
LDL
MEM PROD & INJECTION
MEM BORAX LOG
MEM BORAX LOG
SCMT
SCMT
US IT
USIT
MEMORY SCMT
MEM INJECTION PROFILE
LDL
SBHP SURVEY
PROD PROFILE W/DEFT
CH EDIT OF PDC LOG W/GR
OH EDIT OF MWD/LWD (REDO OF TVD DATA)
OH EDIT OF MWD/LWD (REDO OF TVD DATA)
OH EDIT OF MWD/LWD
NO. 3941
Company:
R···r-r,.....·' .
:. --~ ~~......> . I......· .
\..~ ". ;.....;
¡)
~[.( 1 ~
08/28/06
~üWò
~C1f & Gas Cons. Ccmrniaicn
Anchorage
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
Field: Prudhoe Bay
CD
1
1
1
1
1
1
2
.
1
1
1
1
1
.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
.
.
WELL LOG TRANSMITTAL
J-¿Y4- ~ :JA- ý
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 17, 2006
I~
RE: MWD Formation Evaluation Logs K-07D + PBl,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
K-07D + PBI:
LAS Data & Digital Log Images:
50-029-21045-04, 72
1 CD Rom
~
¿} I ;) Jidlo
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Helen Wannan
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
August 3, 2005
RE: MWD Formation Evaluation Logs: K-07D,
AJC-MW-3480609
1 LDWG formatted Disc with verification listing.
API#: 50-029-21045-04
+ /J:l~~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: ~ l\ 3-~~~
1tJ ð})j
Signed:
~~u( - Àul1-
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Cornm.
Attn.: Helen Warman
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
August 3, 2005
RE: MWD Formation Evaluation Logs: K-07D PB1,
AK.-MW-3480609
1 LDWG formatted Disc with verification listing.
PlPI#: 50-029-21045-72
If }}¡jl
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: ?. ~ J if ;2 ß 0- Signed:
û/JJ
~Gv(-À(·lÀ-
.
.
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well K-07D
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,151.47' MD
10,170.00' MD
11,901.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Signed :t~¡ ð/JJ
Date S 11(,) ..c¡j~r
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
03-Feb-05
').. 0 Lj - :J. Lf 2..
.
.
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well K-07D PB1
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
9,315.66' MD
9,345.66' MD
10,845.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date j" rv1v) ~ð'tI ¡r"" Signed
Please call me at 273-3545 if you have any questions or concerns.
Regards,
ILl !JLLl
Carl Ulrich
Survey Manager
Attachment(s)
03-Feb-05
ÄDv( -À ~I ).-
a STATE OF ALASKA .
ALAS~L AND GAS CONSERVATION COM ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: a Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC25.105 20AAC25.110
One Other
5. Date Comp., Susp., or Aband.
1/20/2005
6. Date Spudded
1/6/2005
CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH 1VO HOLE
SIZE WT, PER FT, GRADE lOP BoTTOM lOP BoTTOM SIZE CEMENTING RECORD
20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu yds Concrete
13-3/8" 72# L-80 Surface 2709' Surface 2709' 17-1/2" 3264 cu ft PF 'E', 465 cu ft PF II
9-518" 47# L-80 Surface 6992' Surface 6279' 12-1/4" 2119 cu ft Class 'G', 133 cu ft PF 'C'
7" 26# L-80 6803' 9189' 6139' 8362' 8-1/2" 527 cu ft Class 'G'
4-1/2" 12.6# L-80 9036' 9316' 8210' 8488' 6-1/8" 280 cu ft Class 'G'
3-112" x 3-3116" x 2-7/8' 8.81# /6.2# /6.16# L-80 9273' 11901' 8445' 8729' 4-1/8' x 3-314' 62 CU It Class 'G' (Bonzai Cement Job)
23. Perforations open to Production (MD + TVD of Top and 24 TlJl3Il\IG RECORD
Bottom Interval, Size and Number; if none, state "none"): . SIZE DEPTH SET (MD)
2-7/8" Slotted Section 4-1/2", 12.6#, L-80 9040'
MD TVD MD TVD
10436' - 11900' 8791' - 8729'
o GINJ 0 WINJ 0 WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2041' SNL, 473' EWL, SEC. 04, T11N, R14E, UM
Top of Productive Horizon:
592' NSL, 1499' EWL, SEC. 33, T12N, R14E, UM
Total Depth:
550' NSL, 3768' EWL, SEC. 33, T12N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x-_ 6707~ y-_ 5975163 Zone- ASP~_
TPI: x- 671702 y- 5977819 Zone- ASP4
Total Depth: x- 673972 / y- 5977829' Zone- ASP4
No. of Completions
-----~----------
~---~--------,
--------
18. Directional Survey
aYes
DNo
21. Logs Run:
MWD GR / EWR, MGR / CCL / CNL
22.
26.
Date First Production:
February 6, 2005
Date of Test Hours Tested PRODUCTION FOR
217/2005 4 TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .....
Press. 1,150 1 ,300 24-HoUR RATE"""
27.
OIL-BBL
1,184
7. Date T.D. Reached
1/17/2005 ./
8. KB Elevation (ft):
54.66
9. Plug Back Depth (MD+ TVD)
11901 + 8729
10. Total Depth (MD+ TVD) ./
.¡ 11901 + 8729 Ft
11. Depth where SSSV set
(Nipple) 2014' MD
19. Water depth, if offshore
N/ A MSL
25.
1 b. WeWClasš:
a Development DËXp1oratory
o Stratigraphic 0 Service
12. Permit to Drill Number
204-242
13. API Number
50- 029-21 045-04-00
14. Well Name and Number:
PBU K-07D
15. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
Ft
16. Property Designation:
ADL 028300
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
-r/I")~<L.""k.J 9,3¥t ~/??j;)
B..S"!'? /rVi>
r-il>
j/.-/ç ~:r
AMOUNT
PULLED
PACKER SET (MD)
9011'
DEPTH INTERVAL (MD)
2000'
AMOUNT & KIND OF MATERIAL USED
Freeze Protect w/ MeOH
RBDMS BFl FEB 1 7 2005
OR'Glr~AL
f(;ill'.'_._-~'".
C'i'''''' ~'·'r·'J;
. . ".JI.'Jlt'!_C:::Ì'r.)i\li
! ...r··".4-
I/\··!Ë:.·ot> I
, iI¡;~:u .j
L_~
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
OIL-BBL
197
None
Form 1 0-407 Revised 12/2003
GAs-McF
5,989
GAs-McF
35,932
WATER-BBL
6
WATER-BBL
34
CHOKE SIZE I GAS-OIL RATIO
95.10 30,336
OIL GRAVITY-API (CORR)
31.2
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
CONTINUED ON REVERSE SIDE
- c::
,.. ~
,..¡
G
28. GEOLOGIC MARKER"
NAME MD
Shublik 9216'
Sadlerochit 9277'
Top CGL 9353'
Base CGL 9410'
23S8 9455'
22TS 9501'
21TS I Zone 2A 9560'
Zone 1 B 9639'
Zone 1 A 9800'
eRMATlON TESTS
Include and briefly summarize test results. List intervals tested,
TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
29.
8389' None
8449'
8524'
8578'
8620'
8662'
8710'
8764'
8804'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed. ~II n ; 4 LL I 11 Aß"
Terne Hubble r-1{lJv'^"'-. <L~\.{
PBU K-07D 204-242
Well Number
Title
Technical Assistant
Date D'Ji 1't/Q5
Permit No. / Approval No.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Sean McLaughlin, 564-4387
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state 'None".
Form 1 0-407 Revised 12/2003
Submit Original Only
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1/21/2005
N1
Spud Date:
End:
1/512005 00:00 - 07:30 7.50 MOB P PRE Move Nordic 1 from DS 13-24A. Scope down derrick to move
rig under twin towers. Phase 1 weather with 20-30 mph winds.
Good move, 14.2 miles in 9.5 hrs. Killed well with Little Red,
290 bbls of 2% KCL water and 40 BBL Diesel. Well was dead
and all valves closed.
Raise derrick.
07:30 - 07:45 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and
mitigation for backing rig over well.
07:45 - 08:00 0.25 MOB P PRE Back rig over well and set down. No problems.
08:00 - 09:30 1.50 BOPSUF P PRE ACCEPT RIG AT 0800 HRS, 01/05/2005. N/U BOPE.
General rig up and positioning trailers, tanks and M/U hardline.
09:30 - 14:30 5.00 BOPSUF P PRE Pressure and function test BOPE. Send test report to AOGCC.
14:30 - 16:00 1.50 WHIP P WEXIT Pump dart and fill coil. Dart on seat at 56.9 bbls.
16:00-16:15 0.25 WHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for M/U Whipstock BHA. Phase 2 weather
conditions.
16:15-17:20 1.08 WHIP P WEXIT M/U BHA #1, Weatherford Whipstock tray and running tools.
3 RA tags in tray. OAL =
17:20 - 19:10 1.83 WHIP P WEXIT RIH with WFD whipstock tray. pump at minimum rate.
Up Wt at 9200' = 40K, Dwn Wt = 20K.
19:10 -19:20 0.17 WHIP P WEXIT Tag WFD packer at 9340' CTD. Packer was set at 9336'. Set
Dwn 6K. Pick up to 43K. Whipstock is latched. Set down 8K.
Pick up to 46K, Set down 10K, Pick up and pulled free at 54K.
Did not use jars. Whipstock running tool was set to release at
11.5K over. It released at 14K over. Looks good.
Top of WFD packer set at 9,336'.
Top of WFD whipstock set at 9,325'. Whipstock tray set at
30R TF.
19:20 - 21 :00 1.67 WHIP P WEXIT POH while circ well to 1.5# Biozan with 2% KCL water.
21:00 - 21:15 0.25 WHIP P WEXIT Layout WFD running tools.
21 :15 - 21 :30 0.25 STWHIP P WEXIT SAFETY MEETING. Review procedure, hazards and
mitigation for M/U WFD window milling BHA. Phase 2 weather
conditions.
21 :30 - 22:45 1.25 STWHIP P WEXIT M/U BHA #2, WFD 3.80" window milling BHA with WFD
diamond mill and reamer. M/U WFD CTC and pull I press test.
OAL=
22:45 - 00:00 1.25 STWHIP P WEXIT RIH with 3.80" window milling BHA. Circ at 0.2 bpm.
1/6/2005 00:00 - 00:30 0.50 STWHIP P WEXIT RIH with 3.80" WFD window milling BHA.
00:30 - 01 :30 1.00 STWHIP P WEXIT Tag XN Nipple at 9041 ft. Mill out lightly with one small stall.
Ream up and down 2 times. Clean.
01 :30 - 01 :45 0.25 STWHIP P WEXIT Pressure test well to 2100 psi to prove whipstock I packer is
sealed.
Start pressure = 2110 psi, End pressure at 15 min. = 2098 psi.
Good Test.
01 :45 - 02:00 0.25 STWHIP P WEXIT RIH and tag top of whipstock at 9332'. corrected depth to
9325'.
02:00 - 04:30 2.50 STWHIP P WEXIT Milling 3.80" window with WFD milling BHA. Flag Coil at 9325'.
2.7 bpm, 2000-2200 psi, 2-4K WOB, Milled to 9327'. Pick up
to check free spin pressure and down wt. No stalls, slow
steady milling.
04:30 - 06:00 1.50 STWHIP P WEXIT Milling window, 2.7 bpm, 1970-2200 psi, 3-4K WOB, Milled
to 9327.4'.
06:00 - 10:30 4.50 STWHIP P WEXIT Milling window, 2.7 bpm, 2260 psi, 3-4K WOB, Milled
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1 /5/2005
1/21/2005
N1
Spud Date:
End:
1/6/2005 06:00 - 10:30 4.50 STWHIP P WEXIT window to 9330.4 and drill open hole to 9341.
10:30 - 11 :45 1.25 STWHIP N WAIT WEXIT Wait on mud arrival. MI power outage slowed loading.
11 :45 - 13:45 2.00 STWHIP P WEXIT Swap to mud while POH.
13:45 - 16:00 2.25 DRILL P PROD1 LD window mill and string reamer. 3.79"O.D. Mills in good
condition. MU Building assembly with 2.29 bent housing.
Rehead coil.
16:00 - 16:35 0.58 DRILL P PROD1 RIH to 3120'
16:35 - 16:40 0.08 DRILL N RREP PROD1 Power Outage. Total Black out. Generator went down due to
overspeed.
Rig electrician looking into cause.
16:40 - 18:00 1.33 DRILL P PROD1 RIH seen window, tag bottom at 9345'.
18:00 - 19:00 1.00 DRILL P PROD1 Logged GR Tie-in. -12 ft CTD correction. RIH. Tag bottom at
9333'.
19:00 - 19:40 0.67 DRILL P PROD1 Orient TF to 90R.
19:40 - 21 :30 1.83 DRILL P PROD1 Drilling build I turn section. 2.7 bpm, 3100-3800 psi, 90R.
Drilled to 9353', Toolface went to left side.
21 :30 - 21 :50 0.33 DRILL P PROD1 Orient TF to right side.
21 :50 - 00:00 2.17 DRILL P PROD1 Drilling Zone 3 build I turn section. 2.7 bpm, 3100-3800 psi,
90R. 3-5K WOB, Drilled to 9,378'.
117/2005 00:00 - 02:00 2.00 DRILL P PROD1 Drilled Z3 build I turn section, 2.6/2.6 bpm, 3000-3900 psi,
75R, 3-5K WOB, Slow drilling in Zone 3. Drilled to 9,392 ft.
02:00 - 04:00 2.00 DRILL P PROD1 Drilled Z3 build I turn section, 2.6/2.6 bpm, 3000-3900 psi,
80R, 3-5K WOB, Slow drilling in Zone 3. Drilled to 9,405'.
04:00 - 05:00 1.00 DRILL P PROD1 Drilled Z3 build / turn section, 2.6/2.6 bpm, 3000-3900 psi,
80R, 3-5K WOB, Slow drilling in Zone 3, several stalls at
9407'. Not able to drill ahead. Drilled to 9,407.
05:00 - 07:00 2.00 DRILL P PROD1 POH for bit. Flag CT at 9200' EOP. POH.
07:00 - 07:30 0.50 DRILL P PROD1 Swap bits 8-8 ringed out. PU rebuilt HCC bi center.
07:30 - 09:00 1.50 DRILL P PROD1 RIH
09:00 - 16:00 7.00 DRILL P PROD1 Drill Z3 2.6- 2.7 bpm @ 3100 psi, FS = 3000 psi, Up wt 33K,
Dn Wt 18K, TF 90 R, WOB 3-4K, ROP 5-20. Drill to 9468'.
16:00 - 19:00 3.00 DRILL P PROD1 Drill Z2 2.54- 2.67 bpm @ 3100 psi, FS = 3200 psi, Up wt 31K,
Dn Wt 15K , TF 44 R, WOB 3-4K, ROP 20 - 40. Drilled to
9550'.
19:00 - 19:30 0.50 DRILL P PROD1 Wiper trip to window, clean hole. RIH.
19:30 - 21 :45 2.25 DRILL P PROD1 Drilled Z2 build / turn section, 2.7/2.7 bpm, 3100 - 3900 psi,
30R, 65 deg incl, 90 fph, Drilled to 9700'.
21:45-22:10 0.42 DRILL P PROD1 Wiper trip to window, clean hole. RIH.
22:10 - 22:30 0.33 DRILL P PROD1 Orient TF to 30L.
22:30 - 00:00 1.50 DRILL P PROD1 Drilled Z2 - Z1 build I turn section, 2.7/2.7 bpm, 3100 - 3900
psi, 20L, 85 deg incl, 50-90 fph, Drilled to end of build
section at 9780'.
1/8/2005 00:00 - 02:00 2.00 DRILL P PROD1 POH for lateral RES / MWD BHA.
02:00 - 02:15 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for CIO BHA.
02:15 - 04:00 1.75 DRILL P PROD1 CIO BHA. Adjust motor to 1.1 deg, MIU Bit #4, new 3.75" HYC
DS49, M/U RES with MWD. Upload RES tool. OAL = 89.27'.
04:00 - 06:30 2.50 DRILL P PROD1 RIH with Lateral RES MWD BHA #5. SHT tools and orienter.
RIH.
Orient TF to high side to go thru window. Tag botttom and
correct to tag.
06:30 - 08:00 1.50 DRILL P PROD1 Mad pass to window at 120& 900 hr I hr. Tie - in . Correction
-16'.
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1 /5/2005
1/21/2005
N1
Spud Date:
End:
1/8/2005 08:00 - 10:00 2.00 DRILL P PROD1 RIH.
10:00 - 12:30 2.50 DRILL P PROD1 Drill Z1 2.5/2.5 bpm at 3500 psi ,3200psi FS, Drill to 9903.
12:30 - 13:30 1.00 DRILL P PROD1 Wiper to window
13:30 - 14:15 0.75 DRILL P PROD1 Drill Z1 2.6/2.6 bpm @3800 psi, FS = 3200 psi. 7K WOB, TF
91 R, ROP 85 Drill to 9970.
14:15 - 15:15 1.00 DRILL P PROD1 Drill Z1 2.6/2.6 bpm @3800 psi, FS = 3200 psi. 7K WOB, TF
91 R, ROP 110 Drill to 10030
15:15 - 15:45 0.50 DRILL P PROD1 Drill Z1 2.6/2.6 bpm @3800 psi, FS = 3300 psi. 9K WOB, TF
90L, ROP 80 Drill to 10050
15:45 - 16:30 0.75 DRILL P PROD1 Wiper to 9350'
16:30 - 16:45 0.25 DRILL P PROD1 Drill Z1 2.6/2.6 bpm @3800 psi, FS = 3300 psi. 9K WOB, Up
wt 28K, Dn wt 14K, TF 90L, ROP 115. Drill to 10064.
16:45 - 00:00 7.25 DRILL N WAIT PROD1 Phase 3 weather conditions declaired. Pull to window and
standby. Crew notified. 30 hour of fuel and water on location.
3degrees F, $% MPF with we -47F.
1/9/2005 00:00 . 00:00 24.00 DRILL N WAIT PROD1 Phase 3 weather. Rig on standby. Continue to circulate at min
rate periodically moving pipe. Awaiting fuel and supplies.
1/1 0/2005 00:00 - 03:00 3.00 DRILL P PROD1 POH to shut down pump to conserve fuel. Fuel level critical
6". Phase 3 weather conditions. Had to POH anyway due to
Sperry RES Memory being full.
03:00 - 06:00 3.00 DRILL N WAIT PROD1 Received fuel. CIO most of crew. Continue to WOW. Phase
3, 30-40 mph wind, -22F, -80 WC. Drifting snow.
06:00 - 18:00 12.00 DRILL N WAIT PROD1 WOW. Phase 3. -22F, 25-35 mph, -74 WC.
18:00 - 00:00 6.00 DRILL N WAIT PROD1 WOW. Phase 3. -22F, 25-40 mph, -75 WC.
1/11/2005 00:00 - 06:00 6.00 DRILL N WAIT PROD1 WOW. Phase 3. -22F, 25-35 MPH, -72 WC.
06:00 - 09:30 3.50 DRILL N WAIT PROD1 WOW. General Phase 3 lifted. Now Phase 2 on major roads
and Phase 3 on access roads and pads. Rig loader is clearing
K pad and access road of drifts.
09:30 - 12:30 3.00 DRILL P PROD1 Change out rig crews. Convoy BOC with SLB.
12:30 - 13:00 0.50 DRILL P PROD1 PJSM for going back to work after entended phase 3
conditions. Clear all ascess ways check for ice in derrick,
13:00 - 14:00 1.00 DRILL P PROD1 Download RES tool to empty memory.
Check bit, motor and orienter. Bit garde 1: 1.
14:00 - 14:30 0.50 BOPSUP P PROD1 Function test BOP.
14:30 - 16:30 2.00 DRILL P PROD1 RIH to 3100. Shallow hole test OK. RIH
16:30-17:15 0.75 DRILL P PROD1 Tie in at 9390' (0' Correction)
17:15 - 17:30 0.25 DRILL P PROD1 0' Correction continue to RIH
17:30 - 18:00 0.50 DRILL P PROD1 Tag bottom @ 10061' Orient to 120-90 L and continue drilling
18:00 - 18:30 0.50 DRILL P PROD1 New mud at surface
18:30 - 19:00 0.50 DRILL P PROD1 Loosing returns drilled into a fault -100' early 2.6 in - 1.05 out
and is slowly starting to come back.. Fault at 101,06 ft lossing 1
bpm
19:00 - 20:30 1.50 DRILL P PROD1 Drilling.Stillloosing returns 2.45 in - 1.89 to 2.05 out
20:30 - 21 :00 0.50 DRILL P PROD1 Orient TF to 180TF Drill 20 ft before making wiper trip
21 :00 - 22:38 1.63 DRILL P PROD1 Drilling TF @ 180 deg
Qp = 2.31 1 1.80 to 1.89 bpm Pp = 3000 I 3250 psi
Vp = 234 at 2100 hrs
Seems to be healing up when drilling.
22:38 - 23:30 0.87 DRILL P PROD1 Wiper trip to window at 9323 ft. PUW = 37k
Clean trip out to 9,350 ft, reduced Qp to 1.3 bpm. RIH at 15
fpm to reduce surge pressure. Added 90 bbl used mud to
system. Vol 166 to 243 bbls
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1/21/2005
N1
Spud Date:
End:
1/11/2005 23:30 - 00:00 0.50 DRILL P PROD1 Drilling TF @ HS TF
Qp = 2.42/2.06 bpm. Pp = 3000/3415 psi
Vp = 240 bbls at 2330 hrs
ROP 70 to 100 fph
1/12/2005 00:00 - 01 :00 1.00 DRILL P PROD1 Drilling TF @ HS TF
Qp = 2.42/1.80 bpm. Pp = 3100/3515 psi
Vp = 206 bbls at 0030 hrs.
01 :00 - 01 :30 0.50 DRILL P PROD1 Orient TF to LS
01 :30 - 02:00 0.50 DRILL P PROD1 Drilling TF @120 to 110 L TF
Qp = 2.42 /1.80 to 2.1 bpm. Pp = 3175/3515 psi
Vp = 169 bbls at 0120 hrs.
02:00 - 03:40 1.67 DRILL P PROD1 Wiper trip to window and reduced running speed
Adding old mud to system V1 = 147 to 284 bbl
03:40 - 03:50 0.17 DRILL P PROD1 Drilling TF @ 80L TF
Qp = 2.46/1.55 to 2.1 bpm. Pp = 3200 13600 psi
Vp = 249 bbls at 0340 hrs.
ROP = 110 fph
Geo wants 88 deg hole angle
03:50 - 04:00 0.17 DRILL P PROD1 Orient TF to R-side
04:00 - 06:00 2.00 DRILL P PROD1 Drilling TF @ 106 to 144 TF
Qp = 2.47/1.55 to 2.0 bpm. Pp = 3225 I 3882 psi, WOB = 7.5k;
ROP 120 fph
Vp = 236 bbls at 0400 hrs. Added 380 bbl old mud to system
last 12 hrs.
Phase 1 on Spine and Phase 2 on pads at 0500 hrs.
06:00 - 06:30 0.50 DRILL P PROD1 Orient TF to 90R.
06:30 - 07:00 0.50 DRILL P PROD1 Drilling Z1A, 2.5/1.9 bpm, 3350-3900 psi, 80R, 88 deg incl,
Drilled to 10,550'.
07:00 - 07:50 0.83 DRILL P PROD1 Wiper trip to window. Clean hole.
07:50 - 08:15 0.42 DRILL P PROD1 Log GR tie-in at RA tag, added 5 ft CTD.
08:15 - 08:45 0.50 DRILL P PROD1 RIH clean to TD. Tag at 10,553'.
08:45 - 10:15 1.50 DRILL P PROD1 Drilling Z1A, 2.5/2.0 bpm, 3350-3900 psi, 80R, 89 deg incl,
50 FPH, Drilled into Kavik shale at 10,550 ft. Drilled to 10,590'.
10:15 - 12:15 2.00 DRILL P PROD1 Drilling Kavik Shale, 2.5/2.0 bpm, 3350-3900 psi, 80R, 91
deg incl, 40 FPH, Drilled to 10,640'.
12:15 - 12:40 0.42 DRILL P PROD1 Orient to 40R.
12:40 - 14:45 2.08 DRILL P PROD1 Drilling Kavik shale, 2.5/2.1 bpm, 3350-3900 psi, 40R, 95
deg incl, 40 FPH, Drilled to 10,700'.
14:45 - 16:00 1.25 DRILL P PROD1 Wiper trip to window. Clean hole. RIH.
16:00 - 16:20 0.33 DRILL P PROD1 Orient TF to 70L.
16:20 - 18:15 1.92 DRILL P PROD1 Decison was made to set a Weatherford 3-1/2" Aluminum billet
open hole whipstock at 10,450' and drill above Kavik shale.
Need to drill up out of Kavik shale to determine its correct dip.
Drilling Kavik shale. 2.5 I 2.3 bpm, 3200 - 3900 psi, 70L, 95
deg incl, 60 FPH,
Drilled to 10,775'.
18:15 - 19:10 0.92 DRILL P PROD1 Drilling TF @ 43L TF "Kavik Shale"
Qp = 2.461 2.34 bpm. Pp = 3400 / 3600 psi
Vp = 228 bbls at 1830 hrs.
ROP = 20 to +100 fph
Trying to drill out of Kavik Shale for dip calculations prior to
setting AI billet
Seen Z1A GR at 10,845 ft bit depth, 10,800 ft GR depth
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CAL/ST A
NORDIC 1
Start: 1/5/2005
Rig Release: 1/21/2005
Rig Number: N1
Spud Date:
End:
1/12/2005 18:15 - 19:10 0.92 DRILL P PROD1 App Kavik dip at 2.83 deg
19:10 - 22:00 2.83 STKOH C PROD1 POOH to set AI billet. Pulled tight at 10,600' and 10,580 ft
Painted flag at 9000 ft EOP
22:00 - 00:00 2.00 STKOH C PROD1 OOH, stand back injector, LD BHA, down load RES tool
PU WFT AI Bullet with setting tools
1/13/2005 00:00 - 00:15 0.25 STKOH C PROD1 Finished PU WFT AI billet
Fire drill in boiler room.
00:15 - 02:20 2.08 STKOH C PROD1 RIH with AI billet
Corrected to 9000 ft EOP flag (-13 ft)
02:20 - 02:40 0.33 STKOH X DPRB PROD1 SD at 9,840 ft MD 18,750 ft TVD. Angle 88 deg
Hole area has 17 DSL (-17 deg turn) and shale section
Tried several ways to get past, after setting 15k down, took
20k over to get free 5 times
02:40 - 04:55 2.25 STKOH X DPRB PROD1 POOH for cleanout run. Came through WS area OK
Added 100 bbl mud to pit system
04:55 - 05:45 0.83 STKOH X DPRB PROD1 LD billet. Recovered all pieces. PU I MU cleanout BHA,
Sperry's MWD with DS49 and 1.04deg motor.
05:45 - 07:45 2.00 STKOH X DPRB PROD1 RIH with MWD cleanout BHA with 1.04 deg motor and DS49
bit.
Correct -16' at flag.
07:45 - 08:30 0.75 STKOH X DPRB PROD1 RIH to 9900' with 120R TF, no motor work or wt loss at 9840'.
Back ream from 9870-9820' at at 120R 2 fpm to clean possible
ledge at 9840'. It was drilled at 70L.
08:30 - 09:10 0.67 STKOH X DPRB PROD1 Orient TF to 170L, RIH and Backream 9870-9815'. No motor
work.
09:10 - 09:40 0.50 STKOH X DPRB PROD1 Orient TF to 60L, RIH and Backream 9870-9820'. No motor
work.
09:40 - 10:10 0.50 STKOH X DPRB PROD1 Orient TF to 60R, RIH and Backream 9870-9820'. No motor
work.
10:10 - 10:30 0.33 STKOH X DPRB PROD1 RIH clean to 10,500'. Circ in very high vis FloPro 30 bbl pill.
2.7 bpm, full returns,
10:30 - 11 :00 0.50 STKOH X DPRB PROD1 POH while laying in 30 bbl, very high vis FloPro pill in open
hole.
11:00 -11:15 0.25 STKOH X DPRB PROD1 Log GR tie-in at RA tag. Added 1.5 ft CTD.
11:15-12:45 1.50 STKOH X DPRB PROD1 POH.
12:45 - 13:15 0.50 STKOH X DPRB PROD1 Layout BHA.
13:15 - 13:30 0.25 STKOH X DPRB PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation to M/U Weatherford AL Whipstock BHA.
13:30 - 14:30 1.00 STKOH X DPRB PROD1 M/U Weatherford 3.5" OH AL Whipstock, running tools, MHA, 2
jts PH6 tubing and CTC. OAL = 99.24 ft.
Rounded off lower end of WFD anchor with grinder to bullnose
end of tool. Tool had 1" flat center with beveled end.
Ran 2 jts of PH6 to reduce side force of coil.
14:30 - 16:00 1.50 STKOH X DPRB PROD1 RIH with Open hole Whipstock.
Correct to flag at 9102'. -17 ft.
16:00 - 16:45 0.75 STKOH X DPRB PROD1 RIH clean thru window. RIH and circ at 0.7 bpm, 1400 psi.
RIH clean past 9840'. RIH clean to 10492'. Up wt = 33k. Dwn
wt = 22K.
16:45 - 17:30 0.75 STKOH X DPRB PROD1 Insert 5/8" steel ball, position top of whipstock at 10,450'.
Displace ball at 2.5 bpm, 2500 psi, Slow pump to 1.25 bpm,
1700 psi at 38 bbls. Ball on seat at 51 bbls. Press up to 3800
psi. Stack 2K, Press up to 4600 psi, stack 4K on whipstock.
Whipstock is set. Press up to 4600 psi at 1 bpm and pull
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1/21/2005
N1
Spud Date:
End:
1/13/2005 16:45 - 17:30 0.75 STKOH X DPRB PROD1 stinger out of whipstock.
Top of whipstock set at 10,450'.
17:30 - 19:30 2.00 STKOH X DPRB PROD1 POH with running tools. Circ at 0.8 bpm, 2800 psi.
Pull thru window clean. Flag still OK at 9002.5' EOP. POH.
19:30 - 21 :00 1.50 STKOH C PROD1 OOH, Recovered setting tool, LD same. PJSM, PU ST BHA wi
HTC STR 335 bit and 1.7 deg bend mtr. scribed HS and
confirmed. Serviced MHA, changed CTC set-screws, pull
tested to 45k and PT to 4,000 psi. Stabbed injector
21 :00 - 22:50 1.83 STKOH C PROD1 RIH, SHT at 3,000 ft Corrected -20 ft at EOP flag
22:50 - 23:10 0.33 STKOH C PROD1 Tie-in from 9360 ft up (-1 ft)
23:10 - 00:00 0.83 STKOH C PROD1 RIH to 10420 ft
1/14/2005 00:00 - 00:15 0.25 STKOH C PROD1 RIH to 10420 ft Orient TF to 30 L before tagging billet
00:15 - 00:30 0.25 STKOH X DFAL PROD1 RIH, tagged at 10,447 ft. Set wt on billet, acts like billets going
in hole. Set down hard at 10,472.0 ft. TF at 26L. Took 4k wt
and motor work (stall). PUH.
00:30 - 02:30 2.00 STKOH X DFAL PROD1 Time drill off off billet @ 0.1 ft 16 min. TF@34L
Qp = 2.47 I 2.36 bpm; Pp = 33251 3275 psi
Vp = 301 bbl at 0030 hrs
02:30 - 03:25 0.92 STKOH X DFAL PROD1 Control drilling at 13 fpm. TF@34 to 29L
Qp = 2.55/2.55 bpm; Lossing 0.3 bpm; Pp = 3250 I 3300 psi
Vp = 274 bbl at 0324 hrs
03:25 - 04: 10 0.75 STKOH X DFAL PROD1 Started pushing; Drilling TF@40 to 29L
Qp = 2.55/2.55 bpm; Lossing 0.3 bpm; Pp = 3250 I 3330 psi
ROP = 74 fph. Not looking good at 10,502 ft, not building hole
angle, pushing billet down hole. Order new billet with setting
tool.
04:10 - 04:25 0.25 STKOH X DFAL PROD1 PUH, sticky from 10530 ft came free at 10460 ft, Pulled 25k to
30k over several times. Acts like shale instability from 10,470
ft to 10,490 ft.
04:25 - 05:05 0.67 STKOH X DFAL PROD1 POOH free above 10460 ft, POOH
05:05 - 05:30 0.42 STKOH X DFAL PROD1 Confirm tie-in for flag (+2.5 ft). Flag coil at 9000' EOP.
05:30 - 07:00 1.50 STKOH X DFAL PROD1 POOH
07:00 - 08:30 1.50 STKOH X DFAL PROD1 UO BHA. Cut 14' of coil and M/U new CTC. Pull I press test
CTC.
08:30 - 08:45 0.25 STKOH C PROD1 SAFETY MEETING. Review procedure, hazards and
mitigation for M/U MWD ST BHA.
08:45 - 09:40 0.92 STKOH C PROD1 M/U 3.75" HCC R60 Bit with brass cap. M/U 2.0 deg motor,
MWD, new orienter and MHA. OAL = 64.97'.
09:40 - 11 :30 1.83 STKOH C PROD1 RIH with open hole sidetrack BHA. No pump.
Correct depth to flag at 9051'. -10.5 ft CTD.
11 :30 - 12:00 0.50 STKOH C PROD1 RIH clean thru window. RIH and sat down at 9804'. Pick up
and get toolface.
RIH clean to 10190 ft.
12:00 - 12:30 0.50 STKOH C PROD1 Orient TF to 160R. /
12:30 - 13:40 1.17 STKOH C PROD1 Cut trough from 10,170-10,185' at 15 fph, 160R, 18K down wt.
2.5/2.3 bpm, 3200 psi, Flag coil at 10,185'.
13:40 - 14:30 0.83 STKOH C PROD1 Cut second pass of trough from 10,170-10,185' at 15 fph,
160R, 18K down wt. 2.5/2.3 bpm, 3230 psi,
14:30 - 15:30 1.00 STKOH C PROD1 Park bit at flag for 15 min. to ensure ledge.
Drill at 0.1 ftlmin for 5 ft. 2.5 bpm, 3200 psi, 160R, 89.6 deg,
19.5K dwn wt.
Drilled to 10,190'.
15:30 - 16:15 0.75 DRILL C PROD1 Drill OH sidetrack in Z1A. 15 FPH for 5 ft. 2.5 bpm, 3230 psi,
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1/21/2005
N1
Spud Date:
End:
1/14/2005 15:30 - 16:15 0.75 DRILL C PROD1 151R, 88.7 deg, 17.3 K. Looks like good OH sidetrack.
Drilled to 10,195'.
16:15 - 16:30 0.25 DRILL C PROD1 Drill OH sidetrack in Z1A. 30 FPH for 5 ft. 2.5 bpm, 3300 psi,
151R, 87.6 deg, 17 K. Good OH sidetrack. Drilled to 10,198'.
Open hole Sidetrack depth started at 10,170'.
16:30 - 16:45 0.25 DRILL C PROD1 Orient TF to 60R.
16:45 - 17:15 0.50 DRILL C PROD1 Drill OH sidetrack in Z1A. 2.5 bpm, 3300 psi, 50R, 85 deg,
16 K. 30-50 FPH. Good OH sidetrack. Drilled to 10,210'.
17:15 - 17:25 0.17 DRILL C PROD1 Drill OH sidetrack in Z1 A. 2.5 bpm, 3400 psi, 40R, 85 deg,
15 K. 60 FPH. Drilled to 10,230'
17:25 - 17:40 0.25 DRILL C PROD1 Orient TF to 30L.
17:40 - 18:00 0.33 DRILL C PROD1 Drill OH sidetrack in Z1A. 2.5 bpm, 3600 psi, 30L, 90 deg,
14 K. 80 FPH. Drilled to 10,245'. Project 94 deg incl at bit.
18:00 - 18:10 0.17 DRILL C PROD1 Orient TF to 160R.
18:10-19:30 1.33 DRILL C PROD1 Ream trough to deepen and extend it for lateral BHA and liner.
Ream up and down 2 times from 10,200 ft-1 0,157 ft at 160R
TF
Op = 2.39 / 2.37 bpm; Pp = 3100 psi
19:30 - 20:00 0.50 DRILL C PROD1 Orient TF to HS, backe ream at 10 R
20:00 - 22:00 2.00 DRILL C PROD1 POOH
22:00 - 22:30 0.50 DRILL C PROD1 LD ST BHA.
22:30 - 23:55 1.42 DRILL C PROD1 PU MWD I Res BHA, download Res tool
23:55 - 00:00 0.08 DRILL C PROD1 RIH
1/15/2005 00:00 - 01 :45 1.75 DRILL C PROD1 RIH
01 :45 - 02:00 0.25 DRILL C PROD1 Tied-in at RA Marker (-7 ft correction)
02:00 - 02:30 0.50 DRILL C PROD1 RIH wI 180 to 160R TF and tagged at 10,240 ft
02:30 - 03:05 0.58 DRILL C PROD1 MAD pass up for tie-in from 10,240 ft to 10,184 ft
03:05 - 03:15 0.17 DRILL C PROD1 RIH and orient TF to 70 L
03:15 - 05:05 1.83 DRILL C PROD1 Drilling Z1 at 70 L then walked up to HS
Op = 2.57 I 2.63 bpm; Pp 3300/3525 psi
ROP = 60-75 fpm
05:05 - 05:25 0.33 DRILL C PROD1 Orient TF to 72 L
05:25 - 06:45 1.33 DRILL C PROD1 Drilling Z1 at 70 to 100 L TF
Op = 2.57/2.56 bpm; Pp 3300/3525 psi
ROP = 80 fph
06:45 - 08:30 1.75 DRILL C PROD1 Wiper trip to widow. Clean hole. RIH.
08:30 - 09:30 1.00 DRILL C PROD1 Drilling Z1A lateral, 2.6/2.6 bpm, 3300-3900 psi, 70L, 94
deg incl, 70 fph, Drilled to 10,460'.
Held kick drill.
09:30 - 09:45 0.25 DRILL C PROD1 Orient TF to 90R.
09:45 - 11 :00 1.25 DRILL C PROD1 Drilling Z1 A lateral, 2.6/2.6 bpm, 3300-3900 psi, 90R, 93
deg incl, 70 fph, Drilled to 10,550'.
Held spill drill.
11 :00 - 12:30 1.50 DRILL C PROD1 Wiper trip to window. Clean hole. RIH.
12:30 - 14:50 2.33 DRILL C PROD1 Drilling Z1 A lateral, 2.6/2.6 bpm, 3300-3900 psi, 90R, 91
deg incl, 90 fph, Drilled to 10,700'.
14:50 - 15:45 0.92 DRILL C PROD1 Wiper trip to window. Clean hole.
15:45 - 16:00 0.25 DRILL C PROD1 Log GR tie-in with RA tag. Added 2 ft CTD.
16:00 - 16:40 0.67 DRILL C PROD1 RIH clean to bottom.
16:40 - 17:00 0.33 DRILL C PROD1 Orient TF to 90L.
17:00 - 19:00 2.00 DRILL C PROD1 Drilling Z1A lateral, 2.6/2.6 bpm, 3400-4000 psi, 90L, 90
deg incl, 100 fph, Drilled to 10,780'.
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1 /5/2005
1/21/2005
N1
Spud Date:
End:
1/15/2005 19:00 - 20:26 1.43 DRILL P PROD1 Wiper trip to WS, "Back on Plan Operations"
Clean wiper trip
20:26 - 20:45 0.32 DRILL P PROD1 Drilling Z1 A @ 55L TF
Qp = 2.70/2.61 bpm; Pp = 3600 13830 psi
20:45 - 21 :00 0.25 DRILL P PROD1 Orient TF
21:00 - 22:15 1.25 DRILL P PROD1 Drilling Z1A lateral @ 86L TF
Qp = 2.61/2.61 bpm; Pp = 3600/3775 psi
Started mud swap at 21 :45 hrs at 10,900 ft
22:15 - 22:20 0.08 DRILL P PROD1 Orient TF to 40 R
22:20 - 23:30 1.17 DRILL P PROD1 Drilling Z1A lateral @ 22-54R TF. Hard keeping TF, flipping
L-R?
Qp = 2.63/2.74 bpm; Pp = 3351/3575 psi
ROP at 50 fph. TF is swinging L-R
Taking 2.5 to 3 minutes to get surveys up with 3 curved Res
Tool on
Need to build up to 94 deg to get higher in the structure
23:30 - 00:00 0.50 DRILL P PROD1 PUH, tight, orient TF to R-side try and lock orienter in.
Pulled tight from 10,972 ft to 10,950 ft. Having trouble getting
TF to stay at 50R
1/16/2005 00:00 - 00:20 0.33 DRILL P PROD1 Orient TF to R-side, Finally got TF to 19R
00:20 - 00:30 0.17 DRILL P PROD1 Drilling Z1 A lateral @ 67R TF Orient TF 2 clicks more
Qp = 2.61/2.61 bpm; Pp = 3310 13775 psi
Last sample at 10,950 ft was sand wI trace shale.
ROP = 80 to 100 fph
00:30 - 02:17 1.78 DRILL P PROD1 Wiper trip to WS, orient TF before going the OHST, RIH
02:17 - 04:10 1.88 DRILL P PROD1 Drilling Z1A lateral @ 63R to 100 RTF Try level out at 95 deg
hole angle
Qp = 2.61 12.61 bpm; Pp = 3310/3775 psi
ROP = 50 to 100 fph
04:10 - 04:18 0.13 DRILL P PROD1 Orient TF
04:18 - 04:35 0.28 DRILL P PROD1 Drilling Z1A lateral 100 RTF
Qp = 2.61/2.61 bpm; Pp = 3310/3775 psi
ROP = +100 fph
04:35 - 05:00 0.42 DRILL P PROD1 Orient TF around
05:00 - 05:07 0.12 DRILL P PROD1 Drilling Z1 A lateral 34 R TF
Qp = 2.61/2.61 bpm; Pp = 3400 13724 psi
ROP at 110 fph
05:07 - 06:20 1.22 DRILL P PROD1 Wiper trip to tie-in
06:20 - 06:40 0.33 DRILL P PROD1 Tie-in to RA Marker, -1 ft CTD.
06:40 - 08:10 1.50 DRILL P PROD1 RIH clean to bottom.
08:10 - 08:20 0.17 DRILL P PROD1 Orient TF to 70L.
08:20 - 10:15 1.92 DRILL P PROD1 Drilling Z1A lateral, 2.6/2.6 bpm, 3250 - 3800 psi, 70L, 93
deg, 100 fph, Drilled to 11290'.
10:15 - 12:40 2.42 DRILL P PROD1 Wiper trip to window, clean hole, RIH.
12:40 - 13:10 0.50 DRILL P PROD1 Re-Iog with RES tool at 11130' to check interval of RES data.
13:10-13:20 0.17 DRILL P PROD1 Orient TF to 80L.
13:20 - 14:20 1.00 DRILL P PROD1 Drilling Z1A lateral, 2.6/2.6 bpm, 3250 - 3800 psi, 80L, 91
deg, 120 fph, Drilled to 11,400'.
14:20 - 15:15 0.92 DRILL P PROD1 Drilling Z1A lateral, 2.6/2.6 bpm, 3250 - 3800 psi, 40L, 92
deg, 120 fph, Drilled to 11,451 '.
15:15 - 17:15 2.00 DRILL P PROD1 Wiper trip to window, clean hole, RIH.
17:15 - 17:30 0.25 DRILL P PROD1 Orient TF to 90R.
17:30 - 18:15 0.75 DRILL P PROD1 Drilling Z1 A lateral, 2.6/2.6 bpm, 3250 - 3800 psi, 90R, 94
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1/21/2005
N1
Spud Date:
End:
1/16/2005 17:30 - 18:15 0.75 DRILL P PROD1 deg, 120 fph, Drilled to 11,490'.
18:15-19:00 0.75 DRILL P PROD1 Drilled to 11524 ft, shale on log, PUH and talk to Geo. Shale
above Kavik
Orient TF
19:00 - 19:45 0.75 DRILL P PROD1 Drilling Zone IA lateral at 16R TF
Qp = 2.70 12.72 bpm; Pp 3460 13800 psi
Vp at 1900 hrs = 210 bbl
Build hole angle up to 95 deg
19:45 - 19:55 0.17 DRILL P PROD1 Orient TF to 80-90 R. Projected 95 deg at bit
19:55 - 20:50 0.92 DRILL P PROD1 Drilling Zone IA lateral at 90R TF
Qp = 2.70 / 2.72 bpm; Pp 3460 13800 psi
Trying to hole 93 deg hole angle
20:50 - 22:10 1.33 DRILL P PROD1 Wiper trip to WS
22:10 - 22:30 0.33 DRILL P PROD1 Tie-in at RA Marker 9375 ft (-1.5 ft)
22:30 - 00:00 1.50 DRILL P PROD1 RIH, Oriented TF to 140R before entering OHST. RIH
Added 100 bbl mud to system
1/17/2005 00:00 - 00:15 0.25 DRILL P PROD1 Orient TF to 90 R
00:15 - 03:00 2.75 DRILL P PROD1 Drilling Zone IA lateral at 90R to 130R TF.
Qp = 2.70 / 2.72 bpm; Pp 3460 / 3650 psi
Lossing 6.7 bph. ROP 64 fph with 2,500 Ib WOB.
Tough drilling at 11,667 ft, lots reactive torque and sticking.
Pp increased 150 psi while drilling at 11,676 ft.
03:00 - 06:50 3.83 DRILL P PROD1 Wiper trip after drilling 150 ft. Orient TF to LSR above window
Clean wiper trip Lost 86 bbl in last 12 hrs (7 bph)
06:50 - 07:45 0.92 DRILL P PROD1 Drilling Zone IA lateral on left side at 90L TF. Need to drop hole
angle to 90 for last 150 ft
Qp = 2.66 / 2.65 bpm; Pp 3650 I 4000 psi
Drilled to planned TD of well at 11,900'. ./'
07:45 - 09:40 1.92 DRILL P PROD1 Wiper trip to window. Clean hole.
09:40 - 10:00 0.33 DRILL P PROD1 Log GR tie-in with RA tag at 9318'. Added 1.5 ft CTD.
10:00 - 11 :15 1.25 DRILL P PROD1 RIH clean to TD. Dwn Wt = 14K, Up wt = Tag Final TD at
11,901 ft.
11 :15 - 13:45 2.50 DRILL P PROD1 POH while laying in 54 bbls of new FloPro in open hole for
running liner.
Flag Coil at 9000' EOP and 6500' EOP.
POH to run Liner.
13:45 - 15:30 1.75 DRILL P PROD1 Download Sperry RES tool. Good data.
Layout drilling BHA.
15:30 - 16:15 0.75 CASE P RUNPRD Cut off SWS CTC and M/U Baker CTC. Pull I Press test
Pick up Baker liner running tools.
16:15 - 17:00 0.75 CASE P RUNPRD Circ dart thru coil. 2.2 bpm, 1900 psi, Dart on seat at 56.2
bbls.
17:00 - 17:15 0.25 CASE P RUNPRD Prep rig floor to run liner. M/U 2-7/8" safety joint to TIW valve.
17:15 - 17:30 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and
mitigation for running liner.
17:30 - 21:30 4.00 CASE P RUNPRD M/U Baker 2-7/8" guide shoe and 49 joints of 2-7/8". STL,
pre=drilled liner with turbos.
21 :30 - 23:00 1.50 CASE P RUNPRD Unload pipe shed of excess liner, fill hole with mud
23:00 - 00:00 1.00 CASE P RUNPRD MU and run 3-3/16" Liner Ran 5 jts 3-3/16" v
1/18/2005 00:00 - 10:00 10.00 CASE N RREP RUNPRD SD, restat on SCR control panel failed. Unable to engage
drawworks
Secured well. Keeping hole full.
Rig electrician determined that the dynamic brake resistors for
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 1/5/2005
Rig Release: 1/21/2005
Rig Number: N1
Spud Date:
End:
1/18/2005 00:00 - 10:00 10.00 CASE N RREP RUNPRD the drawworks failed.
10:00 - 11 :00 1.00 CASE P RUNPRD Run last of 3-3/16" liner.
11:00 -11:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and
mitigation for running CSH internal string for liner.
11 :15 - 14:00 2.75 CASE P RUNPRD Run Baker 6' Stinger and NoGo. RIH with 34 jts of 1-1/4" CSH
workstring.
Stack wt with NoGo on O-ring sub. Space out with 1.5' pup jt.
M/U Baker CTLRT to CSH and 3-3/16" liner.
Liner total length = 2628.3 ft. OAL = 2637.7 ft.
14:00 - 16:40 2.67 CASE P RUNPRD RIH with Bonsia Liner, circ at 0.3 bpm, 1450 psi.
Correct to CT flag at 9138 ft. -21 ft. 40 k up wt, 23K dwn wt.
16:40 - 17:30 0.83 CASE P RUNPRD RIH thru window with no wt loss. RIH at 60 fpm. circ 0.3 bpm.
Slow to 20 fpm at 10150' to go thru OH ST. Ran thru OHST
clean.
RIH clean to 11580'. Sat down at 11580', 13K Down wt, RIH
OK to TD.
Tagged TD of 11,901' at 11,898'. Pick up and sat down at
same depth
3 times. Liner is landed.
17:30 - 18:30 1.00 CASE P RUNPRD Insert 3/4" steel disconnect ball in coil and displace at 2.0 bpm
at 2800 psi.
Slow down at 35 bbls, ball on seat at 45.2 bbls. Sheared at
3800 psi.
Pick up and prove coil is free from liner. 34 K pick up.
18:30 - 21 :00 2.50 CEMT P RUNPRD Circ. well to 2% KCL double slick water. Send used FloPro to
MI Plant.
Qp = 1.86/1.94 bpm, 1100 psi.
21:00 - 21:15 0.25 CEMT P RUNPRD PJSM on cementing liner and midi gating problems
13 people on location
21 :15 - 21 :35 0.33 CEMT P RUNPRD Finish loading pits w/ KCL (Vp=334 bbl) and batch mixing 15
bbl 15.8ppg cement.
Cement at density at 21 :35 hrs 15.8ppg (balance)
21 :35 - 22:45 1.17 CEMT P RUNPRD Pumped 2 bbl 2% KCL, SD and PT to 4050 psi
Pumped 11 bb116.0 ppg SD, clean lines and dropped wiper
dart
Pumped 30 bbl1-1/2ppb Bio water.
Pumped 26.8 bbl 2% KCL. Vol T =56.8 bbl wiper dart hit and
sheared at 2600 psi.
Pumped 1.6 bbl. PUH laying in 0.1 bbl of cement.
Circulated 10 bbl cement up annulus. Estimated 2 bbl cement
above TOL
22:45 - 00:00 1.25 CEMT P RUNPRD PUH replacing CT voilage.
1/19/2005 00:00 - 00:40 0.67 CEMT P RUNPRD POOH replacing CT voidage
00:40 - 01 :00 0.33 CEMT P RUNPRD Set back injector, RU to standback CSH in derrick
01 :00 - 01 :45 0.75 CEMT P RUNPRD POOH stabding back CSH
01 :45 - 02:15 0.50 CEMT P RUNPRD MU / RIH wI 2.31 DSM, 2-118" Motor, CS, HDC and CV below
1-1/4" CSH
02:15 - 03:45 1.50 CEMT P RUNPRD RIH with 90 jts CSH BHA = 2805 ft
03:45 - 05:00 1.25 CEMT P RUNPRD Set mechanical counter; RIH 7300 ft. Cir and mixing Biozan
05:00 - 08:00 3.00 CEMT P RUNPRD Cir and WOC to reach 2500 psi compressive strength
Cement at 1200 psi at 0645 hrs, should be 2500 psi at 0800
hrs.
RIH with 2.3" mill to 9400'. Did not tag cement. No hard
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1 /5/2005
1/21/2005
N1
Spud Date:
End:
1/19/2005 05:00 - 08:00 3.00 CEMT P RUNPRD cement in top of 3-3/16" liner. 1.8 bpm, 2400 psi.
Pull mill back to 9200'. UCA at 2500 psi.
08:00 - 08:30 0.50 CEMT P RUNPRD Pressure test liner lap. Chart test. Press up to 1000 psi, Lost
600 psi in 10 min. Press up to 1000 psi again. Lost 600 psi in
10 minutes. Liner Lap failed pressure test.
08:30 - 10:00 1.50 CEMT P RUNPRD RIH with 2.3" mill. 1.8 bpm, 50 fpm, Saw motor work at
10290' .
Mill cement to 10300', saw contaminated cement returns at
surface.
Circulate 25 bbl high vis pill. Mill cement from 10290-10346'.
Stall on Baker O-Ring sub at 10346'. Correct CTD to 10,337'
to tie-in with liner completion depths.
10:00 - 10:30 0.50 CEMT P RUNPRD Milled Baker O-ring sub at 10'337'. 2 stalls, milled thru in 15
min. Reamed for 15 min. OK.
RIH to 10,347'.
10:30 - 11 :30 1.00 CEMT P RUNPRD Milled Baker Float collar at 10347' and Baffle plate at 10348'. 4
stalls total. Milled thru both in 1/2 hour, using minimum WOB.
1.8 bpm 12400 psi.
Reamed up and down 6 times. Area is clean.
11 :30 - 12:40 1.17 CEMT P RUNPRD RIH to PBTD of 11,899'. 1.8 bpm, 3700 psi, Pumped 21 bbl
high vis Biozan pill to clean hole and displaced with KCL water.
Did not see any cement in slotted liner. Tagged PBTD at
11,904'. Correct PBTD = 11,900', Pre-drilled liner is clean.
12:40 - 13:40 1.00 CEMT P RUNPRD POH while circ at 1.9 bpm, 3700 psi. Liner is clean.
13:40 - 14:15 0.58 CEMT P RUNPRD POH from 9200 ft. Circ at 1.9 bpm, 2800 psi.
14:15 - 14:30 0.25 CEMT P RUNPRD Did derrick inspection for ice after safety alert for ice falling out
of derrick. Derrick was clear of ice.
14:30 - 15:00 0.50 CEMT P RUNPRD POH from 9200 ft. Circ at 1.9 bpm, 2700 psi.
15:00 - 16:45 1.75 CEMT P RUNPRD Stand back 45 stds of CSH workstring.
UO milling BHA. Mill graded at 1,1,1.
16:45 - 00:00 7.25 EVAL P LOWER1 Pressure I function test BOPE. Lou Grimaldi of AOGCC
witnessed test.
Rebuild Check Valve on kill side
1/20/2005 00:00 - 02:00 2.00 EVAL P LOWER1 PT BOP's,
02:00 - 02:15 0.25 EVAL P LOWER1 PJSM on handling CNL radicactive source.
02:15 - 02:40 0.42 EVAL P LOWER1 Fill hole (8 bbl) and PU SLB MCNL tool carrier
02:40 - 04:30 1.83 EVAL P LOWER1 RIH with 45 std 1-1/4" CSH. Stabbed inject head
PT inner reel valve to 250/3500 psi
04:30 - 05:30 1.00 EVAL P LOWER1 RIH with Memory logging tool
05:30 - 07:15 1.75 EVAL P LOWER1 RIH logging at 30 fp from 8900 ft to 11900 ft.
Tagged PBTD at 11,908'.
07:15 - 08:00 0.75 EVAL P LOWER1 Log up at 60 fpm while circulating new 2% KCL water to leave
in pre-drilled liner and tubing. Log up to 8900'.
08:00 - 09:15 1.25 EVAL P LOWER1 POH. Continue to circ in new 2% KCL water.
09:15 - 10:30 1.25 EVAL P LOWER1 Stand back 45 stds of CSH.
10:30 - 10:45 0.25 EVAL P LOWER1 SAFETY MEETING. Review procedure, hazards and
mitigation for laying out SWS memory CNUGR.
10:45 -11:15 0.50 EVAL P LOWER1 Layout SWS MCNUGR BHA. Clear floor of SWS tools. SWS
downloading data to fax log to town.
11 :15 - 12:00 0.75 CASE P RUNPRD M/U Baker 4-1/2" KB Liner top Packer with seal assembly
BHA. OAL = 80.2'.
12:00 - 14:10 2.17 CASE P RUNPRD RIH with L TP at 70 fpm, 0.8 bpm, 400 psi.
Review MCNL log on 4-1/2" collar, TOL between4-1/2" casing
Printed: 1/24/2005 10:25:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-07
K-07
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
1/5/2005
1 /21 /2005
N1
Spud Date:
End:
1/20/2005
12:00 - 14:10
2.17 CASE P
14:10 - 16:00
1.83 CASE P
RUNPRD joint
TOL at 9,265 ft TF at 11,903 ft
RUNPRD Stopped at 9,200 ft. PUW 35k
Tagged top of liner9,288.1 ft, SD pump, blew pressure off,
Slacked off 9,295 ft
Pressure test annulus to 600 psi. OK
PUH and unstun9 from TOL to 9,270 ft
Launch 5/8" ball, displace @ 1.36 bpm at 600 psi.
Ball over goose neck at 42 bbl, SD an allow ball to fall, stabbed
into to liner. PU, spaced out to 9,287.5 ft. Pressured up SD,
ball not on seat. Pressured up to 2500 psi, SD 10k
Top of KB packer @ 9,276.13 ft / 9257.10 ft from MCNL
PT annulus to 2,000 psi with 0.7 bbl. Straight lined. Equalized
pressure. Sheared off at 3,600 psi.
PUH and circ clean 2% KCL fluid in tubing
POOH chasing clean 2% KCL fluid to surface
LD Packer running tools
PJSM
PU nozzle BHA
RIH, jetted BOP. RIH to 2000 ft
POOH laying in MEOH, Cir 100% MEOH to surface at 500 ft.
POOH
OOH, closed MV (25 turns)
PJSM on Nitrogen pumpinglCT blow down
Blow down all surface linbe to Tiger tank
ND BOP's and make ready to move off well
RIG RELEASED AT 00:00 HRS
16:00 - 16:45 0.75 CASE P RUNPRD
16:45 - 18:10 1.42 CASE P RUNPRD
18:10-18:30 0.33 CASE P RUNPRD
18:30 - 18:45 0.25 WHSUR P POST
18:45-19:15 0.50 WHSUR P POST
19:15 - 20:25 1.17 WHSUR P POST
20:25 - 20:50 0.42 WHSUR P POST
20:50 - 22:00 1.17 WHSUR P POST
22:00 - 00:00 2.00 DEMOB P POST
Printed: 1/24/2005 10:25:56 AM
Halliburton Sperry-Sun
North Slope Alaska
BPXA
K-07D
.
Job No. AKMW3480609, Surveyed: 17 January, 2005
Survey Report
24 January, 2005
Your Ref: API 500292104504
Surface Coordinates: 5975163.00 N, 670744.00 E (70020'17.0279" N, 148036' 52.1810" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing Elevation: 54.66ft above Mean Sea Level
.
S""t:=- ·...,Y-SUf'1
DR ILLI N(; Se"RVIé: es
A Halliburton Company
Survey Ref: svy4484
Halliburton Sperry-Sun
Survey Report for K-07D
Your Ref: API 500292104504
Job No. AKMW3480609, Surveyed: 17 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(fl) (fl) (fl) (fl) (fl) (fl) (fl) (0/100fl)
10151.47 89.600 88.430 8746.71 8801.37 2516.71 N 1566.49 E 5977714.73 N 672252.78 E 1566.49 Tie On Point
t-. 10170.00 89.650 85.930 8746.83 8801.49 2517.63 N 1585.00 E 5977716.06 N 672271.26 E 13.494 1585.00 Window Point
10196.86 83.500 90.200 8748.44 8803.10 2518.53 N 1611.77E 5977717.58 N 672298.01 E 27.854 1611.77
10223.38 89.470 94.420 8750.06 8804.72 2517.47 N 1638.21 E 5977717.11 N 672324.46 E 27.546 1638.21
10257.01 92.780 91.770 8749.40 8804.06 2515.65 N 1671.77 E 5977716.06 N 672358.06 E 12.607 1671.77
10289.56 93.740 87.540 8747.55 8802.21 2515.84 N 1704.26 E 5977717.00 N 672390.53 E 13.305 1704.26 .
10319.00 96.480 84.550 8744.93 8799.59 2517.87 N 1733.51 E 5977719.68 N 672419.73 E 13.745 1733.51
10350.31 95.330 78.380 8741.70 8796.36 2522.49 N 1764.29 E 5977725.01 N 672450.40 E 19.942 1764.29
10382.88 94.010 74.860 8739.05 8793.71 2530.00 N 1795.87 E 5977733.23 N 672481.79 E 11.509 1795.87
10415.43 93.130 73.270 8737.03 8791.69 2538.92 N 1827.10 E 5977742.86 N 672512.82 E 5.575 1827.10
10450.24 93.220 67.630 8735.10 8789.76 2550.54 N 1859.84 E 5977755.23 N 672545.28 E 16.179 1859.84
10484.79 94.270 67.810 8732.84 8787.50 2563.61 N 1891.74 E 5977769.02 N 672576.88 E 3.083 1891.74
10513.72 93.920 74.330 8730.77 8785.43 2572.97 N 1919.03 E 5977779.00 N 672603.94 E 22.512 1919.03
10547.48 93.660 77.150 8728.54 8783.20 2581.27 N 1951.67 E 5977788.04 N 672636.39 E 8.370 1951.67
10583.50 92.330 85.080 8726.65 8781.31 2586.82 N 1987.18 E 5977794.39 N 672671.76 E 22.293 1987.18
10617.97 91.720 90.720 8725.44 8780.10 2588.08 N 2021.59 E 5977796.44 N 672706.14 E 16.447 2021.59
10652.63 90.930 94.240 8724.63 8779.29 2586.58 N 2056.20 E 5977795.73 N 672740.77 E 10.406 2056.20
10690.67 90.310 98.820 8724.22 8778.88 2582.25 N 2093.98 E 5977792.26 N 672778.64 E 12.149 2093.98
10718.81 89.960 100.760 8724.16 8778.82 2577.47 N 2121.71 E 5977788.11 N 672806.47 E 7.005 2121.71
10752.71 88.810 99.350 8724.52 8779.18 2571.55 N 2155.09 E 5977782.96 N 672839.98 E 5.367 2155.09
10783.51 88.460 96.710 8725.25 8779.91 2567.25 N 2185.58 E 5977779.35 N 672870.55 E 8.644 2185.58
10818.05 90.130 93.710 8725.68 8780.34 2564.11 N 2219.97 E 5977777.00 N 672905.00 E 9.940 2219.97
10851.43 91.980 89.660 8725.06 8779.72 2563.13 N 2253.32 E 5977776.78 N 672938.37 E 13.337 2253.32 .
10881.03 92.600 86.490 8723.88 8778.54 2564.13 N 2282.87 E 5977778.44 N 672967.90 E 10.904 2282.87
10911.35 91.190 84.200 8722.88 8777.54 2566.59 N 2313.07 E 5977781.59 N 672998.03 E 8.866 2313.07
10946.82 93.220 85.250 8721.51 8776.17 2569.84 N 2348.36 E 5977785.65 N 673033.24 E 6.442 2348.36
10976.89 93.040 83.840 8719.87 8774.53 2572.70 N 2378.25 E 5977789.18 N 673063.06 E 4.720 2378.25
11006.18 95.330 87.720 8717.73 8772.39 2574.85 N 2407.38 E 5977792.00 N 673092.12 E 15.351 2407.38
11039.19 95.680 93.890 8714.56 8769.22 2574.39 N 2440.22 E 5977792.28 N 673124.96 E 18.635 2440.22
11069.34 93.920 97.940 8712.04 8766.70 2571 .29 N 2470.09 E 5977789.87 N 673154.90 E 14.603 2470.09
11103.77 93.570 98.820 8709.79 8764.45 2566.28 N 2504.08 E 5977785.64 N 673189.00 E 2.746 2504.08
11138.70 92.690 103.400 8707.88 8762.54 2559.56 N 2538.30 E 5977779.70 N 673223.36 E 13.332 2538.30
11169.08 93.130 102.350 8706.34 8761.00 2552.80 N 2567.87 E 5977773.61 N 673253.08 E 3.743 2567.87
11202.81 92.860 97.240 8704.58 8759.24 2547.08 N 2601.06 E 5977768.64 N 673286.38 E 15.150 2601.06
11234.42 92.250 93.890 8703.17 8757.83 2544.01 N 2632.48 E 5977766.30 N 673317.87 E 10.762 2632.48
24 January, 2005·16:49
Page 2 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for K-07D
Your Ref: API 500292104504
Job No. AKMW3480609, Surveyed: 17 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O¡100ft)
11250.46 92.510 89.660 8702.50 8757.16 2543.52 N 2648.50 E 5977766.16 N 673333.89 E 26.399 2648.50
11280.64 90.130 89.130 8701.81 8756.47 2543.84 N 2678.66 E 5977767.17 N 673364.05 E 8.079 2678.66
11322.23 90.840 84.720 8701.45 8756.11 2546.07 N 2720.18 E 5977770.35 N 673405.50 E 10.740 2720.18
11357.95 92.160 80.670 8700.52 8755.18 2550.61 N 2755.59 E 5977775.69 N 673440.80 E 11 .921 2755.59
11389.41 90.930 75.390 8699.67 8754.33 2557.13 N 2786.35 E 5977782.91 N 673471.40 E 17.226 2786.35
11425.19 91.720 75.390 8698.84 8753.50 2566.15 N 2820.96 E 5977792.72 N 673505.80 E 2.208 2820.96 .
11456.04 94.100 72.210 8697.27 8751.93 2574.74 N 2850.54 E 5977801.98 N 673535.17 E 12.864 2850.54
11486.54 93.480 72.390 8695.26 8749.92 2583.99 N 2879.53 E 5977811.89 N 673563.95 E 2.116 2879.53
11521.57 92.860 78.910 8693.32 8747.98 2592.66 N 2913.40 E 5977821.32 N 673597.61 E 18.668 2913.40
11552.92 96.740 77.680 8690.70 8745.36 2598.99 N 2943.98 E 5977828.35 N 673628.04 E 12.979 2943.98
11584.69 97.530 81.380 8686.75 8741.41 2604.72 N 2974.98 E 5977834.79 N 673658.90 E 11.820 2974.98
11622.51 95.950 86.840 8682.31 8736.97 2608.57 N 3012.32 E 5977839.49 N 673696.14 E 14.933 3012.32
11657.51 94.180 91.070 8679.22 8733.88 2609.20 N 3047.17 E 5977840.91 N 673730.97 E 13.057 3047.17
11687.11 93.920 94.420 8677.13 8731.79 2607.79 N 3076.66 E 5977840.17 N 673760.48 E 11.323 3076.66
11718.98 93.300 99.880 8675.12 8729.78 2603.83 N 3108.20 E 5977836.93 N 673792.11 E 17.208 3108.20
11750.79 91.890 101.290 8673.68 8728.34 2598.00 N 3139.44 E 5977831.81 N 673823.47 E 6.265 3139.44
11785.73 90.130 96.350 8673.06 8727.72 2592.64 N 3173.95 E 5977827.24 N 673858.09 E 15.006 3173.95
11811.00 89.340 94.590 8673.18 8727.84 2590.23 N 3199.10 E 5977825.41 N 673883.29 E 7.634 3199.10
11841.19 89.070 90.540 8673.60 8728.26 2588.88 N 3229.25 E 5977824.74 N 673913.47 E 13.444 3229.25
11875.76 89.870 86.310 8673.92 8728.58 2589.83 N 3263.80 E 5977826.48 N 673947.98 E 12.452 3263.80
-11901.00 89.870 86.310 8673.97 8728.63 ... 2591.46 N 3288.99 E ~ 5977828.68 N 673973.13 E 0.000 3288.99 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. <-.. .
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 90.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11901.00ft.,
The Bottom Hole Displacement is 4187.25ft., in the Direction of 51.765° (True).
24 January, 2005 - 16:49
Page 3 of 4
DríllQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for K-07D
Your Ref: API 500292104504
Job No. AKMW3480609, Surveyed: 17 January, 2005
North Slope Alaska
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10151.47
8801.37
2516.71 N
1566.49 E Tie On Point
.
10170.00
11901.00
8801.49
8728.63
2517.63 N
2591.46 N
1585.00 E Window Point
3288.99 E Projected Survey
Survey tool program for K-07D
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
6991.45
0.00 6991.45
6278.21 11901.00
6278.21 BP High Accuracy Gyro - BOSS-GYRO (K-07)
8728.63 MWD Magnetic (K-07C)
.
24 January, 2005 - 16:49
Page 4 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
North Slope Alaska
BPXA
K-07DPB1
.
Job No. AKMW3480609, Surveyed: 12 January, 2005
Survey Report
24 January, 2005
Your Ref: API 500292104572
Surface Coordinates: 5975163.00 N, 670744.00 E (70020' 17.0279" N, 148036' 52.1810" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing Elevation: 54. 66ft above Mean Sea Level
.
5pe............y-5uf1
DRIL.L.ING seRVices
A Halliburton Company
Survey Ref: svy4483
Halliburton Sperry-Sun
Survey Report for K-07DPB1
Your Ref: API 500292104572
Job No. AKMW3480609, Surveyed: 12 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O¡100ft)
9315.66 12.410 310.190 8432.92 8487.58 2587.62 N 959.74 E 5977771.80 N 671644.57 E 959.74 Tie On Point
9345.66 15.730 337.000 8462.04 8516.70 2593.45 N 955.68 E 5977777.54 N 671640.38 E 24.085 955.68 Window Point
9378.17 17.240 6.120 8493.27 8547.93 2602.31 N 954.47 E 5977786.37 N 671638.97 E 25.566 954.47
9410.17 20.570 25.160 8523.57 8578.23 2612.13 N 957.37 E 5977796.25 N 671641.64 E 21.774 957.37
9439.81 21.800 46.610 8551.25 8605.91 2620.63:N 963.59 E 5977804.90 N 671647.67 E 26.338 963.59
9470.97 23.730 66.120 8580.02 8634.68 2627.16 N 973.55 E 5977811.64 N 671657.47 E 24.891 973.55 .
9500.01 29.000 74.910 8606.04 8660.70 2631.36 N 985.70 E 5977816.12 N 671669.53 E 22.540 985.70
9530.10 33.930 86.860 8631.72 8686.38 2633.72 N 1001.15 E 5977818.84 N 671684.92 E 26.356 1001.15
9560.68 39.110 96.360 8656.31 8710.97 2633.12 N 1019.29E 5977818.65 N 671703.07 E 25.034 1019.29
9591.08 44.820 101.810 8678.91 8733.57 2629.86 N 1039.33 E 5977815.85 N 671723.17 E 22.268 1039.33
9622.12 52.290 104.440 8699.44 8754.10 2624.55 N 1061.96E 5977811.05 N 671745.92 E 24.886 1061.96
9655.47 60.470 108.130 8717.90 8772.56 2616.73 N 1088.57 E 5977803.84 N 671772.71 E 26.195 1088.57
9685.09 68.110 110.950 8730.74 8785.40 2607.79 N 1113.70 E 5977795.48 N 671798.03 E 27.179 1113.70
9716.82 75.500 108.130 8740.64 8795.30 2597.74 N 1142.09 E 5977786.07 N 671826.64 E 24.771 1142.09
9747.98 82.790 104.790 8746.51 8801.17 2589.08 N 1171.41 E 5977778.08 N 671856.15 E 25.651 1171.41
9781.64 88.810 102.170 8748.97 8803.63 2581.26 N 1204.04 E 5977771.01 N 671888.95 E 19.495 1204.04
9808.84 87.930 100.410 8749.75 8804.41 2575.94 N 1230.70 E 5977766.30 N 671915.73 E 7.232 1230.70
9844.07 88.280 94.420 8750.91 8805.57 2571.40 N 1265.60 E 5977762.55 N 671950.72 E 17.022 1265.60
9874.21 90.840 97.410 8751.14 8805.80 2568.29 N 1295.57 E 5977760.13 N 671980.76 E 13.059 1295.57
9893.74 91.540 99.350 8750.74 8805.40 2565.45 N 1314.89E 5977757.72 N 672000.13 E 10.558 1314.89
9921.85 91.190 104.280 8750.07 8804.73 2559.70 N 1342.39 E 5977752.60 N 672027.76 E 17.577 1342.39
9959.61 90.660 108.690 8749.46 8804.12 2548.99 N 1378.58 E 5977742.72 N 672064.18 E 11.762 1378.58
9989.00 90.750 107.810 8749.10 8803.76 2539.78 N 1406.49 E 5977734.15 N 672092.30 E 3.010 1406.49 .
10022.76 91.980 104.460 8748.29 8802.95 2530.40 N 1438.91 E 5977725.51 N 672124.92 E 10.568 1438.91
10058.01 91.540 99.000 8747.21 8801.87 2523.24 N 1473.39 E 5977719.14 N 672159.56 E 15.532 1473.39
10088.73 90.040 95.830 8746.79 8801 .45 2519.28 N 1503.85 E 5977715.87 N 672190.09 E 11.415 1503.85
10120.79 90.310 92.480 8746.69 8801.35 2516.96 N 1535.82 E 5977714.28 N 672222.11 E 10.483 1535.82
10151.47 89.600 88.430 8746.71 8801.37 2516.71 N 1566.49 E 5977714.73 N 672252.78 E 13.402 1566.49
10186.73 89.690 83.670 8746.93 8801.59 2519.14 N 1601.66 E 5977717.96 N 672287.88 E 13.502 1601.66
10217.04 88.190 82.430 8747.49 8802.15 2522.81 N 1631.74 E 5977722.31 N 672317.87 E 6.420 1631.74
10252.03 84.050 83.140 8749.86 8804.52 2527.19 N 1666.36 E 5977727.48 N 672352.39 E 12.004 1666.36
10284.82 86.870 83.140 8752.45 8807.11 2531.10N 1698.81 E 5977732.12 N 672384.74 E 8.600 1698.81
10315.57 90.930 81.730 8753.04 8807.70 2535.14 N 1729.28 E 5977736.86 N 672415.11 E 13.976 1729.28
10350.27 94.360 82.080 8751.44 8806.10 2540.02 N 1763.60 E 5977742.52 N 672449.30 E 9.936 1763.60
10383.90 91.370 79.440 8749.76 8804.42 2545.42 N 1796.74 E 5977748.67 N 672482.31 E 11 .853 1796.74
24 January, 2005 - 16:50
Page 2 of 4
Dril/Quest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for K-07DPB1
Your Ref: API 500292104572
Job No. AKMW3480609, Surveyed: 12 January, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
10416.32 91.720 74.500 8748.89 8803.55 2552.72 N 1828.30 E 5977756.69 N 672513.70 E 15.270 1828.30
10452.48 90.660 77.150 8748.14 8802.80 2561.57 N 1863.35 E 5977766.34 N 672548.54 E 7.892 1863.35
10486.07 89.430 80.670 8748.11 8802.77 2568.03 N 1896.31 E 5977773.55 N 672581.34 E 11.100 1896.31
10519.66 87.220 82.610 8749.09 8803.75 2572.92 N 1929.52 E 5977779.18 N 672614.44 E 8.753 1929.52
10550.64 88.190 86.310 8750.33 8804.99 2575.90 N 1960.33 E 5977782.87 N 672645.17 E 12.337 1960.33
10585.32 89.250 90.890 8751.11 8805.77 2576.75 N 1994.98 E 5977784.51 N 672679.79 E 13.552 1994.98 .
10615.78 91.010 93.540 8751.04 8805.70 2575.57 N 2025.41 E 5977784.02 N 672710.24 E 10.444 2025.41
10646.81 92.860 98.120 8749.99 8804.65 2572.42 N 2056.26 E 5977781.58 N 672741 .15 E 15.910 2056.26
10676.01 95.590 98.820 8747.84 8802.50 2568.14 N 2085.06 E 5977777.95 N 672770.04 E 9.650 2085.06
10705.62 95.420 100.060 8745.00 8799.66 2563.30 N 2114.13 E 5977773.78 N 672799.21 E 4.208 2114.13
10736.62 94.800 96.000 8742.24 8796.90 2558.99 N 2144.70 E 5977770.16 N 672829.87 E 13.197 2144.70
10776.26 96.390 90.540 8738.37 8793.03 2556.74 N 2184.07 E 5977768.81 N 672869.28 E 14.283 2184.07
10824.93 95.240 85.610 8733.43 8788.09 2558.37 N 2232.44 E 5977771.54 N 672917.61 E 10.350 2232.44
10845.00 95.240 85.610 8731.60 8786.26 2559.90 N 2252.37 E 5977773.52 N 672937.50 E 0.000 2252.37 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. ....
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 90.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10845.00ft.,
The Bottom Hole Displacement is 3409.73ft., in the Direction of 41.344° (True).
.
24 January, 2005 - 16:50
Page 3 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for K-07DPB1 ~
Your Ref: API 500292104572
Job No. AKMW3480609, Surveyed: 12 January, 2005
North Slope Alaska
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9315.66
9345.66
10845.00
8487.58
8516.70
8786.26
2587.62 N
2593.45 N
2559.90 N
959.74 E
955.68 E
2252.37 E
Tie On Point
Window Point
Projected Survey
.
Survey tool program for K-07DPB1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
6991.45
0.00 6991.45
6278.21 10845.00
6278.21 BP High Accuracy Gyro - BOSS-GYRO (K-07)
8786.26 MWD Magnetic (K-07C)
.
24 January, 2005 - 16:50
Page 4 of 4
DrillQuest 3.03.06.008
ID
BY
- ....
....
2604'
HESX
4
3
i 1
J
"'"
......
-
~
\
~ObP
. Baker Hughes INTEO~
Survey Report Map Coord;W
Ir&íi.
BAKER
IAIONES
INTEQ
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB KPad
K-07
K-07D
Date: 2/3/2005 Time: 13:51:29 Page: 1
Co-ordinate(NE) Reference: Well: K-07, True North
Vertical (TVD) Reference: Mean Sea Level 0.0
Section (VS) Reference: Well (O.00N,O.00E,90.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft
670342.10 ft
Latitude: 70 19
Longitude: 148 37
North Reference:
Grid Convergence:
57.435 N
5.245 W
True
1.30 deg
Well: K-07 Slot Name: 07
K-07
Well Position: +N/-S 1992.16 ft Northing: 5975163.00 ft Latitude: 70 20 17.028 N
+E/-W 447.28 ft Easting : 670744.00 ft Longitude: 148 36 52.181 W
Position Uncertainty: 0.00 ft
Wellpath: K-07D Drilled From: K-07C
500292104504 Tie-on Depth: 9315.65 ft
Current Datum: K-07C Height 54.66 ft Above System Datum: Mean Sea Level
Magnetic Data: 11/29/2004 Declination: 25.03 deg
Field Strength: 57629 nT Mag Dip Angle: 80.88 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
30.66 0.00 0.00 90.00
Annotation
MD TVD
ft ft
9315.65 8432.91 TIP
9320.00 8437.16 KOP
11901.00 -54.66 TD - Projected Depth
Survey: MWD Start Date: 1/26/2005
Company: Sperry Sun Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Survey
MD loci Azim TV» SSTV» N/S E/W MapN MapE DLS
ft deg deg ft ft ft ft ft ft degJ1000
9315.65 12.41 310.19 8432.91 8432.91 2587.62 959.72 5977771.63 671644.49 959.72 0.00
9320.00 12.70 314.83 8437.16 8437.16 2588.26 959.02 5977772.25 671643.78 959.02 24.08
9345.66 15.73 337.00 8462.05 8462.05 2593.45 955.66 5977777.37 671640.30 955.66 24.08
9378.17 17.24 6.12 8493.27 8493.27 2602.31 954.45 5977786.20 671638.89 954.45 25.57
9410.17 20.57 25.16 8523.57 8523.57 2612.13 957.35 5977796.08 671641.56 957.35 21.77
9439.81 21.80 46.61 8551.25 8551.25 2620.64 963.57 5977804.72 671647.59 963.57 26.34
9470.97 23.73 66.12 8580.02 8580.02 2627.16 973.53 5977811.47 671657.39 973.53 24.89
9500.01 29.00 74.91 8606.04 8606.04 2631.36 985.68 5977815.95 671669.44 985.68 22.54
9530.10 33.93 86.86 8631.72 8631.72 2633.72 1001.13 5977818.66 671684.84 1001.13 26.36
9560.68 39.11 96.36 8656.31 8656.31 2633.12 1019.27 5977818.47 671702.98 1019.27 25.03
9591.08 44.82 101.81 8678.91 8678.91 2629.86 1039.31 5977815.67 671723.09 1039.31 22.27
9622.12 52.29 104.44 8699.45 8699.45 2624.56 1061.94 5977810.88 671745.83 1061.94 24.89
9655.47 60.47 108.13 8717.90 8717.90 2616.74 1088.55 5977803.67 671772.62 1088.55 26.19
9685.09 68.11 110.95 8730.74 8730.74 2607.80 1113.68 5977795.30 671797.93 1113.68 27.18
9716.82 75.50 108.13 8740.65 8740.65 2597.74 1142.06 5977785.90 671826.54 1142.06 24.77
9747.98 82.79 104.79 8746.51 8746.51 2589.08 1171.39 5977777.91 671856.06 1171.39 25.65
9781.64 88.81 102.17 8748.98 8748.98 2581.27 1204.02 5977770.84 671888.85 1204.02 19.50
(Àû t-( -~ <-¡ À
-ObP . Baker Hughes INTE~ r&íï.
BAKER
~s
~ Survey Report Map Coords INTEQ
Company: BP Amoco Date: 2/3/2005 Time: 13:51:29 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (TVD) Reference: Mean Sea Level 0.0
Well: K-07 Section (VS) Reference: Well (O.OON,Q.00E,90.00Azi)
Wellpath: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
9808.84 87.93 100.41 8749.75 8749.75 2575.94 1230.68 5977766.13 671915.63 1230.68 7.23
9844.07 88.28 94.42 8750.92 8750.92 2571.40 1265.58 5977762.38 671950.62 1265.58 17.02
9874.21 90.84 97.41 8751.15 8751.15 2568.30 1295.55 5977759.96 671980.65 1295.55 13.06
9893.74 91.54 99.35 8750.74 8750.74 2565.45 1314.87 5977757.55 672000.03 1314.87 10.56
9921.85 91.19 104.28 8750.07 8750.07 2559.70 1342.37 5977752.43 672027.65 1342.37 17.58
9959.61 90.66 108.69 8749.46 8749.46 2548.99 1378.56 5977742.55 672064.07 1378.56 11.76
9989.00 90.75 107.81 8749.10 8749.10 2539.79 1406.47 5977733.98 672092.18 1406.47 3.01
10022.76 91.98 104.46 8748.30 8748.30 2530.41 1438.89 5977725.34 672124.80 1438.89 10.57
10058.01 91.54 99.00 8747.21 8747.21 2523.25 1473.37 5977718.97 672159.44 1473.37 15.53
10088.73 90.04 95.83 8746.79 8746.79 2519.28 1503.83 5977715.70 672189.97 1503.83 11.41
10120.79 90.31 92.48 8746.69 8746.69 2516.96 1535.80 5977714.11 672221.99 1535.80 10.48
10151.47 89.60 88.43 8746.71 8746.71 2516.72 1566.47 5977714.56 672252.66 1566.47 13.40
10170.00 89.65 85.93 8746.84 8746.84 2517.63 1584.98 5977715.90 672271.13 1584.98 13.49
10196.86 83.50 90.20 8748.44 8748.44 2518.54 1611.75 5977717.41 672297.88 1611.75 27.85
10223.38 89.47 94.42 8750.07 8750.07 2517.47 1638.18 5977716.95 672324.33 1638.18 27.55
10257.01 92.78 91.77 8749.41 8749.41 2515.65 1671.75 5977715.90 672357.93 1671.75 12.61
10289.56 93.78 87.54 8747.54 8747.54 2515.85 1704.24 5977716.83 672390.40 1704.24 13.33
10319.00 96.48 84.55 8744.91 8744.91 2517.87 1733.49 5977719.52 672419.59 1733.49 13.65
10350.31 95.33 78.38 8741.69 8741.69 2522.49 1764.27 5977724.84 672450.26 1764.27 19.94
10382.88 94.01 74.86 8739.03 8739.03 2530.00 1795.84 5977733.07 672481.65 1795.84 11.51
10415.43 93.13 73.27 8737.01 8737.01 2538.92 1827.08 5977742.69 672512.68 1827.08 5.57
10450.24 93.22 67.63 8735.08 8735.08 2550.55 1859.82 5977755.06 672545.14 1859.82 16.18
10484.79 94.27 67.81 8732.82 8732.82 2563.62 1891.72 5977768.85 672576.73 1891.72 3.08
10513.72 93.92 74.33 8730.75 8730.75 2572.97 1919.00 5977778.83 672603.79 1919.00 22.51
10547.48 93.66 77.15 8728.52 8728.52 2581.27 1951.65 5977787.86 672636.24 1951.65 8.37
10583.50 92.33 85.08 8726.63 8726.63 2586.82 1987.16 5977794.22 672671.61 1987.16 22.29
10617.97 91.72 90.72 8725.42 8725.42 2588.08 2021.57 5977796.27 672705.98 2021.57 16.45
10652.63 90.93 94.24 8724.61 8724.61 2586.58 2056.18 5977795.55 672740.62 2056.18 10.41
10690.67 90.31 98.82 8724.20 8724.20 2582.26 2093.96 5977792.09 672778.48 2093.96 12.15
10718.81 89.96 100.76 8724.14 8724.14 2577.47 2121.69 5977787.94 672806.31 2121.69 7.01
10752.71 88.81 99.35 8724.50 8724.50 2571.55 2155.07 5977782.78 672839.81 2155.07 5.37
10783.51 88.46 96.71 8725.23 8725.23 2567.25 2185.55 5977779.18 672870.39 2185.55 8.64
10818.05 90.13 93.71 8725.66 8725.66 2564.12 2219.94 5977776.83 672904.84 2219.94 9.94
10851.43 91.98 89.66 8725.04 8725.04 2563.14 2253.29 5977776.60 672938.20 2253.29 13.34
10881.03 92.60 86.49 8723.86 8723.86 2564.13 2282.85 5977778.27 672967.72 2282.85 10.90
10911.35 91.19 84.20 8722.86 8722.86 2566.59 2313.05 5977781.42 672997.86 2313.05 8.87
10946.82 93.22 85.25 8721.49 8721.49 2569.85 2348.34 5977785.48 673033.06 2348.34 6.44
10976.89 93.04 83.84 8719.85 8719.85 2572.70 2378.23 5977789.01 673062.88 2378.23 4.72
11006.18 95.33 87.72 8717.71 8717.71 2574.85 2407.36 5977791.82 673091.94 2407.36 15.35
11039.19 95.68 93.89 8714.54 8714.54 2574.39 2440.19 5977792.11 673124.78 2440.19 18.64
11069.34 93.92 97.94 8712.02 8712.02 2571.29 2470.07 5977789.70 673154.72 2470.07 14.60
11103.77 93.57 98.82 8709.77 8709.77 2566.29 2504.06 5977785.46 673188.81 2504.06 2.75
11138.70 92.69 103.40 8707.86 8707.86 2559.57 2538.27 5977779.53 673223.17 2538.27 13.33
11169.08 93.13 102.35 8706.32 8706.32 2552.81 2567.85 5977773.44 673252.89 2567.85 3.74
11202.81 92.86 97.24 8704.56 8704.56 2547.08 2601.03 5977768.47 673286.19 2601.03 15.15
11234.42 92.25 93.89 8703.15 8703.15 2544.02 2632.46 5977766.13 673317.67 2632.46 10.76
11250.46 92.51 89.66 8702.48 8702.48 2543.52 2648.47 5977765.99 673333.70 2648.47 26.40
11280.64 90.13 89.13 8701.79 8701.79 2543.84 2678.64 5977767.00 673363.85 2678.64 8.08
11322.23 90.84 84.72 8701.43 8701.43 2546.07 2720.16 5977770.17 673405.30 2720.16 10.74
11357.95 92.16 80.67 8700.50 8700.50 2550.61 2755.57 5977775.52 673440.60 2755.57 11.92
11389.41 90.93 75.39 8699.65 8699.65 2557.13 2786.32 5977782.74 673471.19 2786.32 17.23
11425.19 91.72 75.39 8698.82 8698.82 2566.15 2820.94 5977792.54 673505.59 2820.94 2.21
11456.04 94.10 72.21 8697.26 8697.26 2574.74 2850.52 5977801.81 673534.96 2850.52 12.86
'·ObP . Baker Hughes INTEQ. r&ii.
BAKER
HUG"S
~ Survey Report Map Coords INTEQ
Company: BP Amoco Date: 2/3/2005 Time: 13:51:29 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (TVD) Reference: Mean Sea Level 0.0
Well: K-07 Section (VS) Reference: Well (O.OON,0.00E,90.00Azi)
Wellpath: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
11486.54 93.48 72.39 8695.24 8695.24 2584.00 2879.51 5977811.72 673563.74 2879.51 2.12
11521.57 92.86 78.91 8693.30 8693.30 2592.66 2913.38 5977821.15 673597.39 2913.38 18.67
11552.92 96.74 77.68 8690.68 8690.68 2599.00 2943.96 5977828.18 673627.82 2943.96 12.98
11584.69 97.53 81.38 8686.73 8686.73 2604.72 2974.95 5977834.61 673658.68 2974.95 11.82
11622.51 95.95 86.84 8682.29 8682.29 2608.57 3012.30 5977839.31 673695.92 3012.30 14.93
11657.51 94.18 91.07 8679.20 8679.20 2609.21 3047.15 5977840.74 673730.74 3047.15 13.06
11687.11 93.92 94.42 8677.11 8677.11 2607.79 3076.64 5977840.00 673760.25 3076.64 11.32
11718.98 93.30 99.88 8675.10 8675.10 2603.84 3108.18 5977836.76 673791.88 3108.18 17.21
11750.79 91.89 101.29 8673.66 8673.66 2598.00 3139.42 5977831.63 673823.24 3139.42 6.27
11785.73 90.13 96.35 8673.04 8673.04 2592.64 3173.93 5977827.07 673857.86 3173.93 15.01
11811.00 89.34 94.59 8673.16 8673.16 2590.24 3199.08 5977825.23 673883.06 3199.08 7.63
11841.19 89.07 90.54 8673.58 8673.58 2588.88 3229.23 5977824.57 673913.23 3229.23 13.44
11875.76 89.87 86.31 8673.90 8673.90 2589.83 3263.78 5977826.30 673947.74 3263.78 12.45
ObP
. Baker Hughes INTEQ.
Survey Report Map Coords
II¡¡¡.
BAKUt
~s
~------~~
INTEQ
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Prudhoe Bay
PB K Pad
K-07
K-07D
Date: 1/26/2005 Time: 16:19:00 Page:
Co-ordinate(NE) Reference: Well: K-07, True North
Vertical (TVD) Reference: K-07C 54.7
Section (VS) Reference: Well (0.ooN,O.00E,90.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft
670342.10 ft
Latitude: 70 19
Longitude: 148 37
North Reference:
Grid Convergence:
57.435 N
5.245 W
True
1.30 deg
Well: K-07 Slot Name: 07
K-07
Well Position: +N/-S 1992.16 ft Northing: 5975163.00 ft Latitude: 70 20 17.028 N
+E/-W 447.28 ft Easting : 670744.00 ft Longitude: 148 36 52.181 W
Position Uncertainty: 0.00 ft
Wellpath: K-07D
500292104504
Current Datum: K-07C
Magnetic Data: 11/29/2004
Field Strength: 57629 nT
Vertical Section: Depth From (TVD)
ft
30.66
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
K-07C
9315.65 ft
Mean Sea Level
25.03 deg
80.88 deg
Direction
deg
90.00
Height 54.66 ft
Annotation
MD
ft
9315.65
9320.00
11901.00
TVD
ft
8487.57
8491.82
8728.61
TIP
KOP
TD - Projected Depth
Survey:
Start Date:
Company:
Tool:
Engineer:
Tied-to:
Survey
MD Incl Azim TVD SSTVD NIS EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
30.66 0.00 0.00 30.66 -24.00 0.00 0.00 5975163.00 670744.00 0.00 0.00
91.45 0.45 249.89 91.45 36.79 -0.08 -0.22 5975162.91 670743.78 -0.22 0.74
191.45 0.48 237.10 191.45 136.79 -0.44 -0.94 5975162.53 670743.07 -0.94 0.11
291 .45 0.78 239.30 291.44 236.78 -1.02 -1.88 5975161.94 670742.14 -1.88 0.30
391.45 0.30 237.10 391.44 336.78 -1.51 -2.69 5975161.43 670741.35 -2.69 0.48
491.45 0.27 224.39 491.43 436.77 -1.82 -3.07 5975161.11 670740.97 -3.07 0.07
591.45 0.35 208.10 591.43 536.77 -2.26 -3.38 5975160.67 670740.67 -3.38 0.12
691.45 0.18 203.60 691.43 636.77 -2.67 -3.59 5975160.25 670740.47 -3.59 0.17
791.45 0.15 222.80 791.43 736.77 -2.91 -3.74 5975160.00 670740.33 -3.74 0.06
891.45 0.03 153.81 891.43 836.77 -3.03 -3.82 5975159.88 670740.25 -3.82 0.14
991.45 0.05 197.80 991.43 936.77 -3.10 -3.82 5975159.82 670740.25 -3.82 0.04
1091.45 0.12 213.30 1091.43 1036.77 -3.22 -3.89 5975159.69 670740.19 -3.89 0.07
1191.45 0.22 215.10 1191.43 1136.77 -3.4 7 -4.06 5975159.44 670740.02 -4.06 0.10
1291.45 0.07 126.31 1291.43 1236.77 -3.66 -4.12 5975159.24 670739.97 -4.12 0.23
1391.45 0.18 214.10 1391.43 1336.77 -3.83 -4.16 5975159.08 670739.93 -4.16 0.19
1491.45 0.15 189.10 1491.43 1436.77 -4.09 -4.27 5975158.82 670739.83 -4.27 0.08
1591.45 0.23 208.60 1591.43 1536.77 -4.39 -4.38 5975158.51 670739.72 -4.38 0.10
'^- D v{ -¡L{~.
ObP . Baker Hughes INTEQ. Bíi.
IIAKØt
HUGHU
Survey Report Map Coords INTEQ
Company: BP Amoco Date: 1/26/2005 Time: 16:19:00 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (fVD) Refe.rence: K-07C 54.7
Well: K-07 Section (VS) Reference: Well (0.ooN,O.00E,90.00Azi)
Wellpath: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
1691.45 0.17 143.31 1691.43 1636.77 -4.69 -4.39 5975158.21 670739.72 -4.39 0.22
1791.45 0.12 149.90 1791.43 1736.77 -4.90 -4.25 5975158.01 670739.86 -4.25 0.05
1891.45 0.50 62.50 1891.43 1836.77 -4.79 -3.81 5975158.13 670740.30 -3.81 0.51
1991.45 0.80 46.60 1991.42 1936.76 -4.11 -2.91 5975158.83 670741.18 -2.91 0.35
2091.45 1.08 45.89 2091.41 2036.75 -2.97 -1.73 5975159.99 670742.34 -1.73 0.28
2191.45 1.08 34.50 2191.39 2136.73 -1.54 -0.52 5975161.45 670743.51 -0.52 0.21
2291.45 0.55 5.50 2291.38 2236.72 -0.28 0.06 5975162.72 670744.07 0.06 0.66
2391.45 0.52 67.89 2391.38 2336.72 0.36 0.53 5975163.38 670744.52 0.53 0.55
2491.45 0.33 77.00 2491.37 2436.71 0.60 1.23 5975163.63 670745.21 1.23 0.20
2591.45 0.27 215.10 2591.37 2536.71 0.47 1.37 5975163.50 670745.36 1.37 0.56
2691.45 0.70 59.69 2691.37 2636.71 0.59 1.76 5975163.63 670745.75 1.76 0.95
2791.45 2.08 348.61 2791.34 2736.68 2.68 1.93 5975165.72 670745.87 1.93 1.97
2891.45 4.20 359.50 2891.19 2836.53 8.12 1.54 5975171.15 670745.36 1.54 2.19
2991.45 4.87 10.30 2990.88 2936.22 15.96 2.27 5975179.00 670745.90 2.27 1.08
3091 .45 6.77 17.00 3090.36 3035.70 25.77 4.75 5975188.87 670748.16 4.75 2.01
3191.45 8.05 11.30 3189.52 3134.86 38.27 7.85 5975201.44 670750.97 7.85 1.47
3291.45 9.75 15.19 3288.31 3233.65 53.31 11.44 5975216.55 670754.22 11.44 1.80
3391.45 13.85 8.69 3386.18 3331.52 73.32 15.47 5975236.65 670757.79 15.47 4.30
3491.45 16.00 9.89 3482.81 3428.15 98.74 19.64 5975262.15 670761.39 19.64 2.17
3591.45 17.80 12.00 3578.48 3523.82 127.27 25.19 5975290.80 670766.28 25.19 1.90
3691.45 19.33 13.10 3673.28 3618.62 158.34 32.12 5975322.02 670772.50 32.12 1.57
3791.45 21.17 13.19 3767.09 3712.43 192.04 39.99 5975355.89 670779.60 39.99 1.84
3891.45 24.65 14.39 3859.19 3804.53 229.83 49.30 5975393.88 670788.05 49.30 3.51
3991 .45 26.50 15.19 3949.39 3894.73 271.57 60.33 5975435.85 670798.12 60.33 1.88
4091.45 29.33 15.00 4037.75 3983.09 316.76 72.51 5975481.31 670809.28 72.51 2.83
4191.45 32.32 15.30 4123.61 4068.95 366.22 85.91 5975531.05 670821.54 85.91 2.99
4291.45 35.10 16.50 4206.79 4152.13 419.58 101.13 5975584.75 670835.54 101.13 2.86
4391 .45 36.30 17.19 4287.99 4233.33 475.43 118.05 5975640.96 670851.18 118.05 1.27
4491.45 36.32 17.50 4368.58 4313.92 531.95 135.70 5975697.87 670867.54 135.70 0.18
4591.45 36.50 17.39 4449.06 4394.40 588.58 153.49 5975754.88 670884.04 153.49 0.19
4691.45 36.32 17.69 4529.54 4474.88 645.17 171.38 5975811.86 670900.63 171.38 0.25
4791.45 36.30 17.39 4610.12 4555.46 701.63 189.23 5975868.71 670917.19 189.23 0.18
4891.45 36.10 17.50 4690.81 4636.15 757.98 206.93 5975925.44 670933.61 206.93 0.21
4991.45 36.32 18.00 4771.50 4716.84 814.24 224.94 5975982.10 670950.33 224.94 0.37
5091.45 36.87 19.00 4851.79 4797.13 870.77 243.86 5976039.04 670967.95 243.86 0.81
5191.45 37.22 20.00 4931.60 4876.94 927.56 263.97 5976096.27 670986.77 263.97 0.70
5291.45 38.22 21.30 5010.71 4956.05 984.80 285.55 5976153.98 671007.04 285.55 1.28
5391.45 39.67 24.10 5088.48 5033.82 1042.77 309.83 5976212.48 671029.98 309.83 2.28
5491.45 40.42 25.39 5165.04 5110.38 1101.19 336.76 5976271.50 671055.58 336.76 1.12
5591.45 41.10 25.60 5240.78 5186.12 1160.12 364.87 5976331.05 671082.33 364.87 0.69
5691.45 41.20 25.80 5316.08 5261.42 1219.42 393.40 5976390.98 671109.51 393.40 0.17
5791.45 41.30 26.19 5391.27 5336.61 1278.68 422.30 5976450.88 671137.05 422.30 0.28
5891.45 41.93 26.80 5466.03 5411.37 1338.12 451.93 5976510.97 671165.31 451.93 0.75
5991.45 42.48 27.60 5540.10 5485.44 1397.86 482.64 5976571.40 671194.65 482.64 0.77
6091.45 42.82 28.69 5613.66 5559.00 1457.60 514.60 5976631.84 671225.24 514.60 0.81
6191.45 42.62 28.80 5687.12 5632.46 1517.08 547.22 5976692.05 671256.50 547.22 0.21
6291 .45 42.58 29.00 5760.73 5706.07 1576.34 579.94 5976752.03 671287.85 579.94 0.14
6391.45 42.68 29.30 5834.31 5779.65 1635.49 612.93 5976811.91 671319.49 612.93 0.23
6491.45 42.52 29.39 5907.92 5853.26 1694.49 646.10 5976871.65 671351.30 646.10 0.17
6591.45 42.50 29.19 5981.63 5926.97 1753.42 679.16 5976931.32 671383.01 679.16 0.14
6691.45 41.78 29.30 6055.78 6001.12 1811.97 711.93 5976990.58 671414.44 711.93 0.72
6791.45 42.02 29.00 6130.21 6075.55 1870.29 744.46 5977049.63 671445.63 744.46 0.31
6891.45 42.22 29.00 6204.39 6149.73 1928.95 776.98 5977109.01 671476.80 776.98 0.20
ObP . Baker Hughes INTEQ. .¡¡.
BAKU
IIUGHU
Survey Report Map Coords INTEQ
Company: BP Amoco Date: 1/26/2005 Time: 16:19:00 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (fVD) Reference: K-07C 54.7
Well: K-07 Section (VS) Reference: Well (0.OON,0.00E,90.00Azi)
Wellpath: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/10OO
6991.45 42.62 28.80 6278.21 6223.55 1988.01 809.58 5977168.79 671508.05 809.58 0.42
6991.99 42.62 28.80 6278.61 6223.95 1988.33 809.75 5977169.11 671508.22 809.75 0.00
7008.23 42.93 27.96 6290.53 6235.87 1998.03 815.00 5977178.93 671513.24 815.00 4.00
7042.68 42.88 26.20 6315.76 6261.10 2018.91 825.67 5977200.05 671523.43 825.67 3.48
7077.19 41.00 24.27 6341 .43 6286.77 2039.77 835.51 5977221.13 671532.79 835.51 6.61
7107.28 38.65 22.47 6364.54 6309.88 2057.45 843.16 5977238.98 671540.04 843.16 8.70
7136.07 36.27 20.63 6387.39 6332.73 2073.73 849.60 5977255.40 671546.10 849.60 9.13
7168.73 33.96 18.39 6414.11 6359.45 2091.43 855.88 5977273.24 671551.98 855.88 8.10
7200.22 32.57 16.06 6440.44 6385.78 2107.93 861.00 5977289.84 671556.72 861.00 6.00
7231.42 31.11 12.68 6466.95 6412.29 2123.86 865.09 5977305.87 671560.45 865.09 7.38
7262.36 29.42 11.35 6493.67 6439.01 2139.11 868.34 5977321.19 671563.35 868.34 5.88
7292.59 27.13 12.92 6520.29 6465.63 2153.11 871.35 5977335.25 671566.04 871.35 7.96
7324.24 25.32 16.70 6548.68 6494.02 2166.63 874.91 5977348.84 671569.29 874.91 7.78
7356.71 22.76 20.25 6578.34 6523.68 2179.18 879.08 5977361.48 671573.17 879.08 9.05
7385.51 20.55 18.34 6605.10 6550.44 2189.20 882.60 5977371.58 671576.46 882.60 8.05
7415.79 17.95 15.08 6633.69 6579.03 2198.75 885.48 5977381.20 671579.13 885.48 9.29
7508.09 16.62 7.11 6721.83 6667.17 2225.59 890.82 5977408.15 671583.85 890.82 2.94
7600.44 16.62 7.91 6810.32 6755.66 2251.78 894.27 5977434.40 671586.71 894.27 0.25
7694.61 16.45 7.97 6900.60 6845.94 2278.32 897.97 5977461.02 671589.80 897.97 0.18
7789.29 15.49 11.78 6991.62 6936.96 2303.97 902.41 5977486.77 671593.66 902.41 1.50
7881.61 14.87 13.68 7080.72 7026.06 2327.55 907.73 5977510.46 671598.44 907.73 0.86
7975.53 14.66 13.60 7171.54 7116.88 2350.81 913.37 5977533.84 671603.55 913.37 0.22
8064.12 14.35 13.13 7257.31 7202.65 2372.40 918.50 5977555.54 671608.19 918.50 0.37
8160.68 13.89 13.83 7350.95 7296.29 2395.31 923.99 5977578.57 671613.15 923.99 0.51
8251.64 13.69 14.47 7439.29 7384.63 2416.33 929.29 5977599.70 671617.97 929.29 0.28
8345.82 12.51 14.40 7531.02 7476.36 2437.00 934.61 5977620.49 671622.82 934.61 1.25
8441.30 11.09 14.34 7624.48 7569.82 2455.92 939.46 5977639.51 671627.23 939.46 1.49
8533.72 12.46 11.70 7714.95 7660.29 2474.29 943.68 5977657.97 671631.04 943.68 1.59
8626.94 11.06 10.88 7806.21 7751.55 2492.92 947.41 5977676.68 671634.34 947.41 1.51
8720.23 10.19 10.84 7897.90 7843.24 2509.82 950.65 5977693.64 671637.20 950.65 0.93
8813.52 9.27 11.78 7989.85 7935.19 2525.28 953.74 5977709.17 671639.93 953.74 1.00
8907.44 8.31 12.54 8082.66 8028.00 2539.31 956.76 5977723.26 671642.63 956.76 1.03
9000.76 7.51 13.57 8175.09 8120.43 2551.82 959.65 5977735.84 671645.24 959.65 0.87
9095.62 6.66 11.41 8269.23 8214.57 2563.24 962.19 5977747.31 671647.52 962.19 0.94
9145.11 6.40 10.76 8318.40 8263.74 2568.76 963.28 5977752.85 671648.47 963.28 0.55
9194.51 6.27 10.97 8367.50 8312.84 2574.11 964.30 5977758.23 671649.38 964.30 0.27
9226.44 6.20 11.12 8399.24 8344.58 2577.52 964.97 5977761.65 671649.97 964.97 0.23
9258.27 6.09 349.82 8430.89 8376.23 2580.86 965.00 5977765.00 671649.92 965.00 7.13
9285.34 8.24 321.89 8457.75 8403.09 2583.81 963.55 5977767.90 671648.40 963.55 14.89
9315.65 12.41 310.19 8487.57 8432.91 2587.62 959.72 5977771.63 671644.49 959.72 15.33
9345.66 15.73 337.00 8516.71 8462.05 2593.45 955.66 5977777.37 671640.30 955.66 24.08
9378.17 17.24 6.12 8547.93 8493.27 2602.31 954.45 5977786.20 671638.89 954.45 25.57
9410.17 20.57 25.16 8578.23 8523.57 2612.13 957.35 5977796.08 671641.56 957.35 21.77
9439.81 21.80 46.61 8605.91 8551.25 2620.64 963.57 5977804.72 671647.59 963.57 26.34
9470.97 23.73 66.12 8634.68 8580.02 2627.16 973.53 5977811.47 671657.39 973.53 24.89
9500.01 29.00 74.91 8660.70 8606.04 2631.36 985.68 5977815.95 671669.44 985.68 22.54
9530.10 33.93 86.86 8686.38 8631.72 2633.72 1001.13 5977818.66 671684.84 1001.13 26.36
9560.68 39.11 96.36 8710.97 8656.31 2633.12 1019.27 5977818.47 671702.98 1019.27 25.03
9591.08 44.82 101.81 8733.57 8678.91 2629.86 1039.31 5977815.67 671723.09 1039.31 22.27
9622.12 52.29 104.44 8754.11 8699.45 2624.56 1061.94 5977810.88 671745.83 1061.94 24.89
9655.47 60.47 108.13 8772.56 8717.90 2616.74 1088.55 5977803.67 671772.62 1088.55 26.19
9685.09 68.11 110.95 8785.40 8730.74 2607.80 1113.68 5977795.30 671797.93 1113.68 27.18
ObP . Baker Hughes INTEQ. rea.
IIAK'Ut
HUGIIU
Survey Report Map Coords INTEQ
Company: BP Amoco Date: 1/26/2005 Time: 16:19:00 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (IVD) Reference: K-07C 54.7
Well: K-07 Section (VS) Reference: Well (0.00N,0.00E,90.00Azi)
Well path: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/10Oft
9716.82 75.50 108.13 8795.31 8740.65 2597.74 1142.06 5977785.90 671826.54 1142.06 24.77
9747.98 82.79 104.79 8801.17 8746.51 2589.08 1171.39 5977777.91 671856.06 1171.39 25.65
9781.64 88.81 102.17 8803.64 8748.98 2581.27 1204.02 5977770.84 671888.85 1204.02 19.50
9808.84 87.93 100.41 8804.41 8749.75 2575.94 1230.68 5977766.13 671915.63 1230.68 7.23
9844.07 88.28 94.42 8805.58 8750.92 2571.40 1265.58 5977762.38 671950.62 1265.58 17.02
9874.21 90.84 97.41 8805.81 8751.15 2568.30 1295.55 5977759.96 671980.65 1295.55 13.06
9893.74 91.54 99.35 8805.40 8750.74 2565.45 1314.87 5977757.55 672000.03 1314.87 10.56
9921.85 91.19 104.28 8804.73 8750.07 2559.70 1342.37 5977752.43 672027.65 1342.37 17.58
9959.61 90.66 108.69 8804.12 8749.46 2548.99 1378.56 5977742.55 672064.07 1378.56 11.76
9989.00 90.75 107.81 8803.76 8749.10 2539.79 1406.47 5977733.98 672092.18 1406.47 3.01
10022.76 91.98 104.46 8802.96 8748.30 2530.41 1438.89 5977725.34 672124.80 1438.89 10.57
10058.01 91.54 99.00 8801.87 8747.21 2523.25 1473.37 5977718.97 672159.44 1473.37 15.53
10088.73 90.04 95.83 8801.45 8746.79 2519.28 1503.83 5977715.70 672189.97 1503.83 11.41
10120.79 90.31 92.48 8801.35 8746.69 2516.96 1535.80 5977714.11 672221.99 1535.80 10.48
10151.47 89.60 88.43 8801.37 8746.71 2516.72 1566.47 5977714.56 672252.66 1566.47 13.40
10170.00 89.65 85.93 8801.50 8746.84 2517.63 1584.98 5977715.90 672271.13 1584.98 13.49
10196.86 83.50 90.20 8803.10 8748.44 2518.54 1611.75 5977717.41 672297.88 1611.75 27.85
10223.38 89.47 94.42 8804.73 8750.07 2517.47 1638.18 5977716.95 672324.33 1638.18 27.55
10257.01 92.78 91.77 8804.07 8749.41 2515.65 1671.75 5977715.90 672357.93 1671.75 12.61
10289.56 93.78 87.54 8802.20 8747.54 2515.85 1704.24 5977716.83 672390.40 1704.24 13.33
10319.00 96.48 84.55 8799.57 8744.91 2517.87 1733.49 5977719.52 672419.59 1733.49 13.65
10350.31 95.33 78.38 8796.35 8741.69 2522.49 1764.27 5977724.84 672450.26 1764.27 19.94
10382.88 94.01 74.86 8793.69 8739.03 2530.00 1795.84 5977733.07 672481.65 1795.84 11.51
10415.43 93.13 73.27 8791.67 8737.01 2538.92 1827.08 5977742.69 672512.68 1827.08 5.57
10450.24 93.22 67.63 8789.74 8735.08 2550.55 1859.82 5977755.06 672545.14 1859.82 16.18
10484.79 94.27 67.81 8787.48 8732.82 2563.62 1891.72 5977768.85 672576.73 1891.72 3.08
10513.72 93.92 74.33 8785.41 8730.75 2572.97 1919.00 5977778.83 672603.79 1919.00 22.51
10547.48 93.66 77.15 8783.18 8728.52 2581.27 1951.65 5977787.86 672636.24 1951.65 8.37
10583.50 92.33 85.08 8781.29 8726.63 2586.82 1987.16 5977794.22 672671.61 1987.16 22.29
10617.97 91.72 90.72 8780.08 8725.42 2588.08 2021.57 5977796.27 672705.98 2021.57 16.45
10652.63 90.93 94.24 8779.27 8724.61 2586.58 2056.18 5977795.55 672740.62 2056.18 10.41
10690.67 90.31 98.82 8778.86 8724.20 2582.26 2093.96 5977792.09 672778.48 2093.96 12.15
10718.81 89.96 100.76 8778.80 8724.14 2577.47 2121.69 5977787.94 672806.31 2121.69 7.01
10752.71 88.81 99.35 8779.16 8724.50 2571.55 2155.07 5977782.78 672839.81 2155.07 5.37
10783.51 88.46 96.71 8779.89 8725.23 2567.25 2185.55 5977779.18 672870.39 2185.55 8.64
10818.05 90.13 93.71 8780.32 8725.66 2564.12 2219.94 5977776.83 672904.84 2219.94 9.94
10851.43 91.98 89.66 8779.70 8725.04 2563.14 2253.29 5977776.60 672938.20 2253.29 13.34
10881.03 92.60 86.49 8778.52 8723.86 2564.13 2282.85 5977778.27 672967.72 2282.85 10.90
10911.35 91.19 84.20 8777.52 8722.86 2566.59 2313.05 5977781.42 672997.86 2313.05 8.87
10946.82 93.22 85.25 8776.15 8721.49 2569.85 2348.34 5977785.48 673033.06 2348.34 6.44
10976.89 93.04 83.84 8774.51 8719.85 2572.70 2378.23 5977789.01 673062.88 2378.23 4.72
11006.18 95.33 87.72 8772.37 8717.71 2574.85 2407.36 5977791.82 673091.94 2407.36 15.35
11039.19 95.68 93.89 8769.20 8714.54 2574.39 2440.19 5977792.11 673124.78 2440.19 18.64
11069.34 93.92 97.94 8766.68 8712.02 2571.29 2470.07 5977789.70 673154.72 2470.07 14.60
11103.77 93.57 98.82 8764.43 8709.77 2566.29 2504.06 5977785.46 673188.81 2504.06 2.75
11138.70 92.69 103.40 8762.52 8707.86 2559.57 2538.27 5977779.53 673223.17 2538.27 13.33
11169.08 93.13 102.35 8760.98 8706.32 2552.81 2567.85 5977773.44 673252.89 2567.85 3.74
11202.81 92.86 97.24 8759.22 8704.56 2547.08 2601.03 5977768.47 673286.19 2601.03 15.15
11234.42 92.25 93.89 8757.81 8703.15 2544.02 2632.46 5977766.13 673317.67 2632.46 10.76
11250.46 92.51 89.66 8757.14 8702.48 2543.52 2648.47 5977765.99 673333.70 2648.47 26.40
11280.64 90.13 89.13 8756.45 8701.79 2543.84 2678.64 5977767.00 673363.85 2678.64 8.08
11322.23 90.84 84.72 8756.09 8701.43 2546.07 2720.16 5977770.17 673405.30 2720.16 10.74
11357.95 92.16 80.67 8755.16 8700.50 2550.61 2755.57 5977775.52 673440.60 2755.57 11.92
ObP . Baker Hughes INTEQ. IIÍlW
BAJCD
IIUGHU
Survey Report Map Coords INTEQ
Company: BP Amoco Date: 1/26/2005 Time: 16:19:00 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-07, True North
Site: PB K Pad Vertical (TVD) Reference: K-07C 54.7
Well: K-07 Section (VS) Reference: Well (0.00N,0.00E.90.00Azi)
Wellpath: K-07D Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/1000
11389.41 90.93 75.39 8754.31 8699.65 2557.13 2786.32 5977782.74 673471.19 2786.32 17.23
11425.19 91.72 75.39 8753.48 8698.82 2566.15 2820.94 5977792.54 673505.59 2820.94 2.21
11456.04 94.10 72.21 8751.92 8697.26 2574.74 2850.52 5977801.81 673534.96 2850.52 12.86
11486.54 93.48 72.39 8749.90 8695.24 2584.00 2879.51 5977811.72 673563.74 2879.51 2.12
11521.57 92.86 78.91 8747.96 8693.30 2592.66 2913.38 5977821.15 673597.39 2913.38 18.67
11552.92 96.74 77.68 8745.34 8690.68 2599.00 2943.96 5977828.18 673627.82 2943.96 12.98
11584.69 97.53 81.38 8741.39 8686.73 2604.72 2974.95 5977834.61 673658.68 2974.95 11.82
11622.51 95.95 86.84 8736.95 8682.29 2608.57 3012.30 5977839.31 673695.92 3012.30 14.93
11657.51 94.18 91.07 8733.86 8679.20 2609.21 3047.15 5977840.74 673730.74 3047.15 13.06
11687.11 93.92 94.42 8731.77 8677.11 2607.79 3076.64 5977840.00 673760.25 3076.64 11.32
11718.98 93.30 99.88 8729.76 8675.10 2603.84 3108.18 5977836.76 673791.88 3108.18 17.21
11750.79 91.89 101.29 8728.32 8673.66 2598.00 3139.42 5977831.63 673823.24 3139.42 6.27
11785.73 90.13 96.35 8727.70 8673.04 2592.64 3173.93 5977827.07 673857.86 3173.93 15.01
11811.00 89.34 94.59 8727.82 8673.16 2590.24 3199.08 5977825.23 673883.06 3199.08 7.63
11841.19 89.07 90.54 8728.24 8673.58 2588.88 3229.23 5977824.57 673913.23 3229.23 13.44
11875.76 89.87 86.31 8728.56 8673.90 2589.83 3263.78 5977826.30 673947.74 3263.78 12.45
11901.00 89.87 86.31 8728.61 8673.95 2591.46 3288.97 5977828.50 673972.89 3288.97 0.00
.
~~fÆ~! mlF fÆ~fÆ~~~fÆ
.
AI,ASIiA ORAND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7"' AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Sean McLaughlin
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay K-07D
BP Exploration (Alaska) Inc.
Permit No: 204-242
Surface Location: 2041' SNL, 473' EWL, SEC. 04, TllN, R14E, UM
Bottomho1e Location: 590' NSL, 3742 EWL, SEC. 33, T12N, R14E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 659- (pager).
~
DATED this 1 day of December, 2004
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2041' SNL, 473' EWL, SEC. 04, T11N, R14E, UM
Top of Productive Horizon:
570' NSL, 1234' EWL, SEC. 33, T12N, R14E, UM
Total Depth:
590' NSL, 3742' EWL, SEC. 33, T12N, R14E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 670744 y- 5975163 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 9320 feet
Maximum Hole Angle: 95 degrees
. STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 MC 25.005
1b. Current Well Class 0 Exploratory II Development Oil 0 Multiple Zone
o Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone
5. Bond: 181 Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 PBU K-07D /
6. Proposed Depth: 12. Field I Pool(s):
MD 11900 TVD 867755 Prudhoe Bay Field I Prudhoe Bay
7. Property Designation: Pool
ADL 028300
y"¡ 4A
1-¿/"3/ lo04
9. Acres in Property:
2560
13. Approximate Spud Date:
January 5, 2005 /
14. Distance to Nearest Property:
8500'
8. Land Use Permit:
18. C¡:¡§in.g¡:>rogram:
Size
Hole Casing
4-1/8" x 3-3/4" 3-3/16" x 2-7/8"
Weight
6.2# I 6.16#
Spec:ffiC<:itio)§
Grade Coupling Length
L-80 TCIII STL 2610'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 54.66 feet 600' to K-06
17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3152 Surface: 2272 /"
$~µi)gl:>êþth
TØp .. ..... .... ... Bottom
MD TVD MD TVD (including stage data)
9290' 8408' 11900' 8677' 45 cu ft Class 'G'
19. PRe:SENT WELL CONDITION SWMMARY(Tobe comp1eta<:!forRedrUlANPiRe-en\rYQperations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Depth MD (ft): Depth TVD Junk (measured):
10820 8888 None 10734 8885 None
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2709' 13-3/8" 3264 cu ft PF 'E', 465 cu ft PF II 2709' 2709'
Intermediate 6992' 9-5/8" 2119 cu ft Class 'G', 133 cu ft PF 'C' 6992' 6279'
Production
Liner 2386' 7" 527 cu ft Class 'G' 6803' - 9189' 6139' - 8362'
Liner 1784' 4-1/2" 280 cu ft Class 'G' 9036' - 10820' 8210' - 8888'
20. Attachments 0 Filing Fee, $100 0 BOP Sketch
o Property Plat 0 Diverter Sketch
IPerfOration Depth TVD (ft): 8805' - 8885'
o Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements
Date:
Perforation Depth MD (ft): 9720' - 10730'
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Sean McLaughlin Title CT Drilling Engineer
5..- j\A{L~
Contact Sean McLaughlin, 564-4387
Phone
564-4387
Prepared By Name/Number:
Terrie Hubble, 564-4628
Permit To Drill API Number:
Number: ~ - .2 '-?';7 50- 029-21 045-04~00
Conditions of Approval: Samples Required 0 Yes "BtNo
Hydrogen Sulfide Measures )8rYes 0 No
Other: Të7t BOI)E fO ~5oo pSt'.
Permit Appr9val / ~J I See cover letter for
Date: '/:J.¡ tJ ? / p 7 other requirements
Mud Log Required 0 Yes ~ No
Directional Survey Required )8:Yes 0 No
Onginal Signed By
Approved By: John K. NI:)rmAf1
Form 10-401 Revised 06/2004
tr--\
1".
APPROVED BY
THE COMMISSION
Date Ir/7/~
Submit In Duplicate
.
BP
K-07D Sidetrack
.
CTD Sidetrack Summary
I) Mill window off whipstock
2) Dri1l sidetrack
3) Run liner, cement (bonsai completion)
Mud Program:
· Well kill: 8.4 - 8.9 ppg brin"y'
· Mi1ling/dri1ling: 8.5 - 8.9 ppg used Plo Pro or biozan for milling, new PIo Pro for drilling.
Disposal:
· All drilling and completion fluids and a1l other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 33/16" x 27/8" solid/pre-drilled cemented liner completion (bonsai completion).
o Solid liner 9290' - 10200'
o Pre-drilled liner 10200' - 11,900' &
· The liner cement volume is planned to b -8 Is of 15.8 ppg class G.
CasinglLiner Information -
13 3/8", L-80, 72#, Burst 5380 psi; collapse 2670 psi
95/8", L-80 47#, Burst 6870, collapse 4750
7", L-80, 26#, Burst 7240 psi; collapse 5410 psi
4 W' L-80, 12.6#, Burst 8430 psi; collapse 7500 psi
planned
33/16" L-80 TCrr, 6.2#, Burst 8520 psi; collapse 7660 psi (hole size 4.125")
27/8" L-80 STL 6.16#, Burst 10570 psi; collapse 11170 psi (hole size 3.75")
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
./
Directional
· See attached directional plan. Max. planned hole angle is 95deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
· Distance to nearest property is 8500 ft.
· Distance to nearest we1l within pool 600 ft to K-06 to the south.
Logging
· MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section.
· MCNL wi1l be run cased hole.
Hazards
· K pad is ~ designated as an HzS pad.
· One small fault crossing is anticipated. Lost circulation risk is considered "low".
Reservoir Pressure
· Res. press. is estimated to be 3152 psi at 8800'ss (6.9 ppg EMW).
Max. surface pressure with gas (0.10 psi/ft) to surface is 2272 psi. I
..TREE:::- .
6" ~v'1cEVOY
.
K-07C
. SAFETY NOTES: WELL ANGLE> 70° @ 9784' & >
80° @ 9830'. PRE- K-07C SDTRK WELLBORE (K-
07B) NOT SHOWN ON THIS DIAGRAM.
WELLHEAD = McEVOY
ACTUA TOR = OTIS
KB. ELEV = 54.66'
BF. ELEV = 2791'
""-~'.'.-'-."""'-"""'."....-""'-"-.......--~-- '-'~---'-""----~'~
KOP = 3300'
=--=-=-'=-'.'---~...=-.'.~.-.-'_.~-~.'~--'.~
Max Angle = 90 @ 10123'
Datum MD = 10069'
Datum TVD = 8800' SS
/13-3/8" CSG, L-80, ID= 12.347" H
2709'
~
I 2014' H4-1/2" HES X NIP, ID = 3.813"
=--1 2604' H9-5/8" DV COLLAR I
~
-
Minimum ID = 3.725" @ 9028'
4-1/2" HES XN NIPPLE
-'=
ST MD TVD
4 3295 3238
3 6012 5501
2 7836 6982
1 8888 8009
GAS LIFT MANDRELS
DEV TYPE VLV LATCH
11 MMG-M DOME RK
42 MMG-M S/O RK
17 KBG-2LS DV BTM
8 KBG-2LS DV BTM
PORT
16
20
o
o
DATE
12/11/99
12/11/99
12/06/99
12/06/99
14-112" TBG, 12.6#, L-80, .0152 bpf, ID:: 3.958" I
TOPOF BAKER TIEBACK SLEEVE H
19-5/8" X 7" BAKERZXP PKR, ID:: 6.313" -
19-5/8" X 7" BAKER HMC HGR, ID = 6.250" -
6803'
6809'
6816'
l
i
J
~
1r
17" LNR. 26#, L-80, ID = 6.276" -
9-5/8" CSG MILLOUT WINDOW
6992' - 7008' (OFF WHIPSTOCK)
I TOP OF WHIPSTOCK -
6992'
I 9-5/8" CSG, 47#, L-80, ID:: 8.681" I
I TOP OF 9-5/8" CIBP H 7024'
I OLD 5-1/2" TBG STUB - 7336'
n
8997' -4-1/2" HES X NIP, ID:: 3.813" I
9011' H 7" X 4-1/2" HES TNT PKR, ID :: 3.875" I
9028' -4-1/2" HES XN NIP, ID:: 3.725" I
9040' -4-1/2" WLEG I
17" X 5" BKR ZXP PKR I HMC HGR. ID:: 4.375" - 9036'
14-1/2" TBG, 12.6#, L-SO, .0152 bpf, ID:: 3.958" H
PERFORA TION SUMMARY
REF LOG: TCP PERF
ANGLE AT TOP PERF: 80 @ 9830'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 9720 - 9740 0 10/23/03
2-7/8" 6 9750 - 9770 0 10/23/03
2-3/4" 4 9830 - 10030 0 12/05/99
2-3/4" 4 10080 - 10230 0 12/05/99
2-3/4" 4 10300 - 10530 0 12/05/99
2-3/4" 4 10580- 10730 0 12/05/99
I PBTD H 10734'
14-112" LNR. 12.6#, L-80, .0152 bpf, ID = 3.958" H 10820'
DATE
12/05/83
12/06/99
02/28/02
08/04/03
10/23/03
REV BY COMMENTS
ORIGINAL COMPLETION
RIG SIDETRACK (K-07C)
CHITP CORRECTIONS
CMOITLP KB ELEVATION & MAX ANGLE
CJSITLP A DD PERFS
DATE
REV BY
COMMENTS
PRUDHOE BA Y UNrr
WELL: K-07C
PERMfTNo: 1991090
API No: 50-029-21045-03
SEe 4, T11 N, R14E. 2041' SNL & 473' EWL
BP Exploration (Alaska)
6" McEVOY
WELLHEAD = McEVOYI
OTIS
Max Angle =
Datum MO =
WO=
SAFETY NOTES: WELL & >
80" @ 9830'. PRE- K-01CSDTRi{WEI.,L80RE (K-
(78) NOT SHOWN ON THiS DiAGRAM.
27.91'
@ 10123'
10069'
8800' SS
[13-3/8" CSG, L-80, ID = 12.347"
2709'
Minimum ID =
4-1/2" HES XI\!
9028'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" I
TOP OF BAKER TIEBACK SLEEVE
19-5/8" X 7" BAKERZXP 10 = 6.313"
19-5/8" X 7" BAKER HMC HGR, ID
6803'
6809'
I TOP OF WHIPSTOCK
I TOP OF 9-5/8" CIBP
I OLD 5-1/2" TBG STUB
7336'
[ 9-5/8" CSG, 47#, L-80, 10 = 8.681" I
17" X 5" BKR ZXP PKR / HMC HGR, ID = 4.375"
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID= 3.958"
LNR, 26#, L-80, 10 = 6.276"
9036'
9039'
ÆRFORA TION SUMMARY
REF LOG: TCP PERF
ANGLEATTOPÆRF: 80 @ 9830'
Note: Refer to Production 08 for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 6 9720 - 9740
2-7/8" 6 9750 - 9770
2-3/4" 4 9830 - 10030
2-3/4" 4 10080 - 10230
2-3/4" 4 10300 - 10530
2-3/4" 4 10580 10730
4-1/2" LNR. 12.6#, L-80, .0152 bpf, ID
DATE
12/05/83
12/06/99
02/28/02
08/04/03
10/23/03
10820'
DATE
REV BY COMMENTS
ORIGINAL COM F'LE110N
RIG SIDETRACK (K-07C)
CHlTP CORRECTIONS
CMO/TLP KB ELEVATION & MAX ANGLE
CJSITLP ADD ÆRFS
~n
I l
~
REV BY
..
2014' 1-14-1/2" HES X NIP, ID= 3.813"
::-----i
&
2604' 1-19-5/8" DV COLLAR I
GAS LIFT MANDRElS
ST MD WD DEV TYPE PORT DATE
.......b 4 3295 3238 11 MMG-M DOME RK 12/11/99
3 6012 5501 42 MMG-M SIO RK 20 12/11/99
2 7836 6982 17 KBG-2LS DV BTM 0 12/06/99
1 8888 8009 8 KBG-2LS DV 8TM 0 12/06/99
l
)
i
9-5/8" CSG MILLOUT WINDOW
6992' - 7008' (OFF WHIPSTOCK)
....
HESX
ID= 3.875" I
J
9040'
~
COMMENTS
PRUDHOE SAY UNIT
WELL: K-07C
1991090
50-029-21045-03
R14E, 2041' EWL
SEC4,
SF'
. ,
.
.
Obp
BP-GDB
Baker Hughes INTEQ Planning Report
'"IE
INT£Q
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Nortbing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft
670342.10 ft
Latitude: 70 19
Longitude: 148 37
North Reference:
Grid Convergence:
57.435 N
5.245 W
True
1.30 deg
Well: K-07 Slot Name:
K-07
Well Position: +N/-S 1992.16 ft Nortbing: 5975163.00 ft Latitude:
+E/-W 447.28 ft Easting: 670744.00 ft Longitude:
Position Uncertainty: 0.00 ft
07
70 20 17.028 N
148 36 52.181 W
Wellpath: Plan#3 K-07D
500292104504
Current Datum: K-07C
Magnetic Data: 11/29/2004
Field Strength: 57629 nT
Vertical Section: Depth From (TVD)
ft
30.66
+N/-S
ft
0.00
Drilled From:
Tie-on Deptb:
Above System Datum:
Declination:
Mag Dip Angle:
+EI-W
ft
0.00
K-07C
9320.00 ft
Mean Sea Level
25.03 deg
80.88 deg
Direction
deg
90.00
Height 54.66 ft
Targets
K-07D Polygon2.1 0.00 2491.16 1785.30 5977694.00 672472.00 70 2041.526 N 148 36 0.020 W
-Polygon 1 0.00 2491.16 1785.30 5977694.00 672472.00 70 2041.526 N 148 36 0.020 W
-Polygon 2 0.00 2483.26 3537.70 5977726.00 674224.00 70 2041.442 N 148 35 8.821 W
-Polygon 3 0.00 2677.68 3522.12 5977920.00 674204.00 70 20 43.354 N 148 35 9.273 W
-Polygon 4 0.00 2665.33 2790.60 5977891.00 673473.00 70 20 43.236 N 148 35 30.647 W
-Polygon 5 0.00 2670.16 1700.35 5977871.00 672383.00 70 20 43.287 N 148 36 2.501 W
K-07D Fault 1 0.00 2824.57 1508.80 5978021.00 672188.00 70 20 44.806 N 148 36 8.097 W
-Polygon 1 0.00 2824.57 1508.80 5978021.00 672188.00 70 20 44.806 N 148 36 8.097 W
-Polygon 2 0.00 2581.13 1568.28 5977779.00 672253.00 70 2042.411 N 148 36 6.360 W
-Polygon 3 0.00 2319.76 1844.42 5977524.00 672535.00 70 20 39.840 N 148 3558.294 W
-Polygon 4 0.00 2581.13 1568.28 5977779.00 672253.00 70 2042.411 N 148 36 6.360 W
K-07D Fault 2 0.00 2810.28 950.30 5977994.00 671630.00 70 20 44.666 N 148 3624.415 W
-Polygon 1 0.00 2810.28 950.30 5977994.00 671630.00 70 20 44.666 N 148 3624.415 W
-Polygon 2 0.00 2897.04 1313.39 5978089.00 671991.00 70 20 45.519 N 148 36 13.806 W
-Polygon 3 0.00 2824.57 1508.80 5978021.00 672188.00 70 20 44.806 N 148 36 8.097 W
-Polygon 4 0.00 2763.19 1963.56 5977970.00 672644.00 70 20 44.201 N 148 35 54.810 W
-Polygon 5 0.00 2806.05 2321.65 5978021.00 673001.00 70 20 44.622 N 148 35 44.347 W
-Polygon 6 0.00 2794.80 2815.55 5978021.00 673495.00 70 20 44.509 N 148 35 29.916 W
-Polygon 7 0.00 3143.87 3915.86 5978395.00 674587.00 70 20 47.937 N 148 34 57.762 W
-Polygon 8 0.00 2794.80 2815.55 5978021.00 673495.00 70 20 44.509 N 148 35 29.916 W
-Polygon 9 0.00 2806.05 2321.65 5978021.00 673001.00 70 20 44.622 N 148 35 44.347 W
-Polygon 10 0.00 2763.19 1963.56 5977970.00 672644.00 70 20 44.201 N 148 35 54.810 W
-Polygon 11 0.00 2824.57 1508.80 5978021.00 672188.00 70 20 44.806 N 148 36 8.097 W
-Polygon 12 0.00 2897.04 1313.39 5978089.00 671991.00 70 20 45.519 N 148 36 13.806 W
K-07D T2.3 8685.00 2579.47 3134.75 5977813.00 673819.00 70 20 42.390 N 148 35 20.592 W
K-07D T2.1 8747.00 2613.28 1738.07 5977815.00 672422.00 70 20 42.727 N 148 36 1.399 W
K-07D T2.2 8747.00 2600.50 2342.98 5977816.00 673027.00 70 20 42.600 N 148 35 43.726 W
.
.
Obp
BP-GDB
Baker Hughes INTEQ Planning Report
...
.....
INTEQ
Targets
Annotation
9315.65 8432.91 TIP
9320.00 8437.15 KOP
9340.00 8456.59 end 9 DLS I begin 25 DLS
9380.00 8494.92 4
9455.00 8564.74 5
9786.79 8747.51 end 25 DLS I begin 12 DLS
9911.79 8747.51 7
10261.79 8747.51 8
10461.79 8747.51 9
10711.79 8747.51 10
10961.79 8747.51 11
11211.79 8736.24 12
11411.79 8718.41 13
11661.79 8696.39 14
11900.00 8677.08 TD
Plan: Plan #3 Date Composed: 11/29/2004
Similar to Lamar's Plan #3 Version: 1
Principal: Yes Tied-to: From: Definitive Path
Plan Secôon Information
9315.65 12.41 310.19 8432.91 2587.62 959.72 0.00 0.00 0.00 0.00
9320.00 13.02 309.38 8437.15 2588.23 958.98 14.61 14.02 -18.62 343.31
9340.00 14.35 314.52 8456.59 2591.40 955.48 9.00 6.64 25.71 45.00
9380.00 19.45 344.77 8494.92 2601.32 950.18 25.00 12.75 75.63 75.00
9455.00 25.55 32.72 8564.74 2627.21 955.69 25.00 8.13 63.93 95.00
9786.79 90.00 106.18 8747.51 2644.25 1197.47 25.00 19.43 22.14 75.00
9911.79 90.00 121.18 8747.51 2594.19 1311.62 12.00 0.00 12.00 90.00
10261.79 90.00 79.18 8747.51 2533.69 1648.44 12.00 0.00 -12.00 270.00
10461.79 90.00 103.18 8747.51 2529.60 1846.94 12.00 0.00 12.00 90.00
10711.79 90.00 73.18 8747.51 2537.44 2093.97 12.00 0.00 -12.00 270.00
10961.79 90.00 103.18 8747.51 2545.28 2341.00 12.00 0.00 12.00 90.00
11211.79 95.06 73.57 8736.24 2552.15 2587.80 12.00 2.02 -11.84 280.15
11411.79 95.02 97.67 8718.41 2567.26 2784.96 12.00 -0.02 12.05 89.00
11661.79 94.85 67.55 8696.39 2598.93 3029.09 12.00 -0.07 -12.05 271.00
11900.00 94.26 96.22 8677.08 2632.06 3261.69 12.00 -0.25 12.04 90.00
Survey
9315.65 12.41 310.19 8432.91 2587.62 959.72 5977771.63 671644.49 959.72 0.00 0.00 TIP
9320.00 13.02 309.38 8437.15 2588.23 958.98 5977772.22 671643.74 958.98 14.61 343.31 KOP
9325.00 13.34 310.76 8442.02 2588.97 958.11 5977772.94 671642.85 958.11 9.00 45.00 MWD
9340.00 14.35 314.52 8456.59 2591.40 955.48 5977775.31 671640.16 955.48 9.00 43.66 end 9 DL
9350.00 15.18 323.78 8466.26 2593.32 953.82 5977777.20 671638.46 953.82 25.00 75.00 MWD
9375.00 18.60 341.96 8490.19 2599.76 950.64 5977783.56 671635.14 950.64 25.00 66.05 MWD
9380.00 19.45 344.77 8494.92 2601.32 950.18 5977785.11 671634.64 950.18 25.00 48.64 4
9400.00 19.63 359.75 8513.78 2607.90 949.29 5977791.66 671633.60 949.29 25.00 95.00 MWD
9425.00 21.49 16.82 8537.21 2616.49 950.60 5977800.28 671634.71 950.60 25.00 80.87 MWD
9450.00 24.76 30.43 8560.21 2625.40 954.58 5977809.28 671638.49 954.58 25.00 64.88 MWD
9455.00 25.55 32.72 8564.74 2627.21 955.69 5977811.11 671639.56 955.69 25.00 52.35 5
.
.
Obp
BP-GDB
Baker Hughes INTEQ Planning Report
INT&Q
Survey
9475.00 27.24 43.32 8582.66 2634.17 961.17 5977818.20 671644.87 961.17 25.00 75.00 MWD
9500.00 30.33 54.63 8604.59 2641.99 970.25 5977826.22 671653.78 970.25 25.00 65.50 MWD
9525.00 34.22 63.82 8625.73 2648.76 981.72 5977833.24 671665.09 981.72 25.00 55.57 MWD
9550.00 38.66 71.24 8645.85 2654.37 995.43 5977839.17 671678.67 995.43 25.00 47.80 MWD
9575.00 43.49 77.29 8664.70 2658.78 1011.23 5977843.94 671694.36 1011.23 25.00 41.82 MWD
9600.00 48.58 82.34 8682.06 2661.93 1028.93 5977847.49 671711.98 1028.93 25.00 37.25 MWD
9604.49 49.51 83.16 8685.00 2662.35 1032.30 5977847.99 671715.34 1032.30 25.00 33.75 K-07D -~
9625.00 53.86 86.63 8697.71 2663.77 1048.32 5977849.77 671731.32 1048.32 25.00 33.21 MWD
9650.00 59.27 90.38 8711.49 2664.29 1069.16 5977850.77 671752.15 1069.16 25.00 31.05 MWD
9675.00 64.78 93.72 8723.21 2663.49 1091.21 5977850.47 671774.21 1091.21 25.00 28.99 MWD
9700.00 70.36 96.77 8732.75 2661.37 1114.21 5977848.87 671797.25 1114.21 25.00 27.42 MWD
9725.00 75.99 99.62 8739.98 2657.95 1137.88 5977845.99 671820.99 1137.88 25.00 26.25 MWD
9750.00 81.64 102.32 8744.83 2653.28 1161.94 5977841.87 671845.15 1161.94 25.00 25.42 MWD
9775.00 87.32 104.95 8747.23 2647.41 1186.11 5977836.56 671869.45 1186.11 25.00 24.90 MWD
9786.79 90.00 106.18 8747.51 2644.25 1197.47 5977833.65 671880.87 1197.47 25.00 24.65 end 25 D
9800.00 90.00 107.77 8747.51 2640.39 1210.10 5977830.08 671893.59 1210.10 12.00 90.00 MWD
9825.00 90.00 110.77 8747.51 2632.14 1233.70 5977822.38 671917.36 1233.70 12.00 90.00 MWD
9850.00 90.00 113.77 8747.51 2622.67 1256.83 5977813.43 671940.70 1256.83 12.00 90.00 MWD
9875.00 90.00 116.77 8747.51 2612.00 1279.44 5977803.28 671963.55 1279.44 12.00 90.00 MWD
9900.00 90.00 119.77 8747.51 2600.16 1301.45 5977791.95 671985.82 1301.45 12.00 90.00 MWD
9911.79 90.00 121.18 8747.51 2594.19 1311.62 5977786.20 671996.12 1311.62 12.00 90.00 7
9925.00 90.00 119.60 8747.51 2587.50 1323.01 5977779.78 672007.66 1323.01 12.00 270.00 MWD
9950.00 90.00 116.60 8747.51 2575.73 1345.06 5977768.52 672029.97 1345.06 12.00 270.00 MWD
9975.00 90.00 113.60 8747.51 2565.13 1367.70 5977758.43 672052.85 1367.70 12.00 270.00 MWD
10000.00 90.00 110.60 8747.51 2555.73 1390.86 5977749.56 672076.21 1390.86 12.00 270.00 MWD
10025.00 90.00 107.60 8747.51 2547.55 1414.48 5977741.92 672100.01 1414.48 12.00 270.00 MWD
10050.00 90.00 104.60 8747.51 2540.62 1438.50 5977735.54 672124.18 1438.50 12.00 270.00 MWD
10075.00 90.00 101.60 8747.51 2534.95 1462.84 5977730.43 672148.65 1462.84 12.00 270.00 MWD
10100.00 90.00 98.60 8747.51 2530.57 1487.45 5977726.61 672173.35 1487.45 12.00 270.00 MWD
10125.00 90.00 95.60 8747.51 2527.48 1512.26 5977724.09 672198.22 1512.26 12.00 270.00 MWD
10150.00 90.00 92.60 8747.51 2525.70 1537.19 5977722.87 672223.18 1537.19 12.00 270.00 MWD
10175.00 90.00 89.60 8747.51 2525.22 1562.19 5977722.96 672248.18 1562.19 12.00 270.00 MWD
10200.00 90.00 86.60 8747.51 2526.05 1587.17 5977724.36 672273.13 1587.17 12.00 270.00 MWD
10225.00 90.00 83.60 8747.51 2528.18 1612.07 5977727.07 672297.98 1612.07 12.00 270.00 MWD
10250.00 90.00 80.60 8747.51 2531.62 1636.83 5977731.07 672322.66 1636.83 12.00 270.00 MWD
10261.79 90.00 79.18 8747.51 2533.69 1648.44 5977733.40 672334.21 1648.44 12.00 270.00 8
10275.00 90.00 80.77 8747.51 2535.99 1661.45 5977735.99 672347.16 1661.45 12.00 90.00 MWD
10300.00 90.00 83.77 8747.51 2539.35 1686.22 5977739.92 672371.85 1686.22 12.00 90.00 MWD
10325.00 90.00 86.77 8747.51 2541.42 1711.13 5977742.55 672396.71 1711.13 12.00 90.00 MWD
10350.00 90.00 89.77 8747.51 2542.17 1736.12 5977743.87 672421.67 1736.12 12.00 90.00 MWD
10375.00 90.00 92.77 8747.51 2541.62 1761.11 5977743.89 672446.66 1761.11 12.00 90.00 MWD
10400.00 90.00 95.77 8747.51 2539.76 1786.04 5977742.60 672471.62 1786.04 12.00 90.00 MWD
10425.00 90.00 98.77 8747.51 2536.60 1810.83 5977740.00 672496.48 1810.83 12.00 90.00 MWD
10450.00 90.00 101.77 8747.51 2532.14 1835.43 5977736.11 672521.17 1835.43 12.00 90.00 MWD
10461.79 90.00 103.18 8747.51 2529.60 1846.94 5977733.83 672532.74 1846.94 12.00 90.00 9
10475.00 90.00 101.60 8747.51 2526.76 1859.84 5977731.29 672545.70 1859.84 12.00 270.00 MWD
10500.00 90.00 98.60 8747.51 2522.38 1884.45 5977727.47 672570.40 1884.45 12.00 270.00 MWD
10525.00 90.00 95.60 8747.51 2519.29 1909.26 5977724.94 672595.27 1909.26 12.00 270.00 MWD
10550.00 90.00 92.60 8747.51 2517.51 1934.19 5977723.73 672620.24 1934.19 12.00 270.00 MWD
10575.00 90.00 89.60 8747.51 2517.03 1959.18 5977723.82 672645.23 1959.18 12.00 270.00 MWD
10600.00 90.00 86.60 8747.51 2517.86 1984.17 5977725.22 672670.19 1984.17 12.00 270.00 MWD
10625.00 90.00 83.60 8747.51 2520.00 2009.07 5977727.92 672695.04 2009.07 12.00 270.00 MWD
10650.00 90.00 80.60 8747.51 2523.43 2033.83 5977731.92 672719.71 2033.83 12.00 270.00 MWD
Obp
.
.
BP-GDB
Baker Hughes INTEQ Planning Report
..E
INTKQ
Survey
10675.00 90.00 77.60 8747.51 2528.16 2058.38 5977737.20 672744.14 2058.38 12.00 270.00 MWD
10700.00 90.00 74.60 8747.51 2534.17 2082.64 5977743.76 672768.26 2082.64 12.00 270.00 MWD
10711.79 90.00 73.18 8747.51 2537.44 2093.97 5977747.29 672779.51 2093.97 12.00 270.00 10
10725.00 90.00 74.77 8747.51 2541.09 2106.67 5977751.22 672792.12 2106.67 12.00 90.00 MWD
10750.00 90.00 77.77 8747.51 2547.02 2130.95 5977757.71 672816.26 2130.95 12.00 90.00 MWD
10775.00 90.00 80.77 8747.51 2551.68 2155.51 5977762.92 672840.70 2155.51 12.00 90.00 MWD
10800.00 90.00 83.77 8747.51 2555.04 2180.28 5977766.85 672865.39 2180.28 12.00 90.00 MWD
10825.00 90.00 86.77 8747.51 2557.10 2205.19 5977769.48 672890.25 2205.19 12.00 90.00 MWD
10850.00 90.00 89.77 8747.51 2557.86 2230.18 5977770.80 672915.21 2230.18 12.00 90.00 MWD
10875.00 90.00 92.77 8747.51 2557.31 2255.17 5977770.82 672940.20 2255.17 12.00 90.00 MWD
10900.00 90.00 95.77 8747.51 2555.45 2280.09 5977769.53 672965.16 2280.09 12.00 90.00 MWD
10925.00 90.00 98.77 8747.51 2552.28 2304.89 5977766.93 672990.03 2304.89 12.00 90.00 MWD
10950.00 90.00 101.77 8747.51 2547.83 2329.49 5977763.04 673014.72 2329.49 12.00 90.00 MWD
10961.79 90.00 103.18 8747.51 2545.28 2341.00 5977760.75 673026.28 2341.00 12.00 90.00 11
10975.00 90.28 101.62 8747.48 2542.45 2353.90 5977758.21 673039.24 2353.90 12.00 280.15 MWD
11000.00 90.81 98.67 8747.24 2538.04 2378.51 5977754.37 673063.94 2378.51 12.00 280.15 MWD
11025.00 91.33 95.71 8746.77 2534.91 2403.30 5977751.81 673088.80 2403.30 12.00 280.12 MWD
11050.00 91.86 92.76 8746.08 2533.07 2428.22 5977750.53 673113.75 2428.22 12.00 280.06 MWD
11075.00 92.37 89.80 8745.16 2532.51 2453.19 5977750.54 673138.73 2453.19 12.00 279.98 MWD
11100.00 92.88 86.84 8744.01 2533.24 2478.16 5977751.84 673163.67 2478.16 12.00 279.87 MWD
11125.00 93.39 83.88 8742.64 2535.26 2503.03 5977754.42 673188.49 2503.03 12.00 279.74 MWD
11150.00 93.88 80.92 8741.06 2538.56 2527.76 5977758.29 673213.13 2527.76 12.00 279.57 MWD
11175.00 94.36 77.95 8739.26 2543.13 2552.27 5977763.42 673237.53 2552.27 12.00 279.39 MWD
11200.00 94.84 74.97 8737.25 2548.97 2576.49 5977769.80 673261.62 2576.49 12.00 279.17 MWD
11211.79 95.06 73.57 8736.24 2552.15 2587.80 5977773.24 673272.85 2587.80 12.00 278.93 12
11225.00 95.08 75.16 8735.07 2555.70 2600.47 5977777.07 673285.43 2600.47 12.00 89.00 MWD
11250.00 95.12 78.17 8732.85 2561.44 2624.70 5977783.36 673309.52 2624.70 12.00 89.14 MWD
11275.00 95.14 81.19 8730.61 2565.90 2649.19 5977788.38 673333.90 2649.19 12.00 89.41 MWD
11300.00 95.15 84.20 8728.37 2569.06 2673.89 5977792.11 673358.52 2673.89 12.00 89.68 MWD
11325.00 95.15 87.21 8726.12 2570.93 2698.71 5977794.54 673383.29 2698.71 12.00 89.95 MWD
11350.00 95.13 90.22 8723.88 2571.49 2723.60 5977795.66 673408.16 2723.60 12.00 90.22 MWD
11375.00 95.10 93.23 8721.66 2570.74 2748.49 5977795.48 673433.06 2748.49 12.00 90.49 MWD
11400.00 95.05 96.25 8719.44 2568.68 2773.30 5977793.99 673457.91 2773.30 12.00 90.76 MWD
11411.79 95.02 97.67 8718.41 2567.26 2784.96 5977792.83 673469.60 2784.96 12.00 91.02 13
11425.00 95.05 96.07 8717.25 2565.68 2798.03 5977791.55 673482.69 2798.03 12.00 271.00 MWD
11450.00 95.09 93.06 8715.04 2563.70 2822.85 5977790.14 673507.55 2822.85 12.00 270.86 MWD
11475.00 95.11 90.05 8712.82 2563.02 2847.73 5977790.03 673532.45 2847.73 12.00 270.59 MWD
11500.00 95.12 87.04 8710.59 2563.65 2872.62 5977791.22 673557.31 2872.62 12.00 270.33 MWD
11525.00 95.12 84.03 8708.36 2565.59 2897.45 5977793.73 673582.08 2897.45 12.00 270.06 MWD
11550.00 95.10 81.02 8706.13 2568.83 2922.13 5977797.53 673606.69 2922.13 12.00 269.79 MWD
11575.00 95.07 78.00 8703.91 2573.37 2946.61 5977802.62 673631.06 2946.61 12.00 269.52 MWD
11600.00 95.02 74.99 8701.71 2579.18 2970.83 5977808.98 673655.13 2970.83 12.00 269.25 MWD
11625.00 94.96 71.98 8699.54 2586.26 2994.70 5977816.60 673678.84 2994.70 12.00 268.99 MWD
11650.00 94.89 68.97 8697.39 2594.58 3018.17 5977825.45 673702.11 3018.17 12.00 268.73 MWD
11661.79 94.85 67.55 8696.39 2598.93 3029.09 5977830.05 673712.92 3029.09 12.00 268.47 14
11675.00 94.85 69.14 8695.28 2603.79 3041.32 5977835.19 673725.04 3041.32 12.00 90.00 MWD
11700.00 94.83 72.15 8693.17 2612.04 3064.82 5977843.97 673748.35 3064.82 12.00 90.13 MWD
11725.00 94.81 75.16 8691.06 2619.05 3088.72 5977851.52 673772.08 3088.72 12.00 90.39 MWD
11750.00 94.77 78.17 8688.98 2624.79 3112.96 5977857.82 673796.18 3112.96 12.00 90.64 MWD
11775.00 94.71 81.18 8686.91 2629.26 3137.47 5977862.84 673820.58 3137.47 12.00 90.89 MWD
11800.00 94.65 84.19 8684.87 2632.43 3162.18 5977866.57 673845.21 3162.18 12.00 91.14 MWD
11825.00 94.57 87.20 8682.86 2634.30 3187.03 5977869.00 673870.01 3187.03 12.00 91.39 MWD
ObP
. .
BP-GDB
Baker Hughes INTEQ Planning Report
-..
.....
INT&Q
Survey
11850.00 94.48 90.21 8680.89 2634.86 3211.94 5977870.13 673894.90 3211.94 12.00 91.63 MWD
11875.00 94.37 93.22 8678.96 2634.11 3236.85 5977869.95 673919.82 3236.85 12.00 91.87 MWD
11900.00 94.26 96.22 8677.08 2632.06 3261.69 5977868.47 673944.70 3261.69 12.00 92.10 TD
1/29/2004
(K-07/Plan#3 K.Q7D)
Date:
Plan: Plan #3
Created By. Srij Potnis
LEGEND
BP
WELt-PATH DETML$
Pia¡.¡ç#3 K.o1Þ
5002$2104504
Par\!'l'it Weflpalfu 1<.o.C
Tie Oil MDI 9320.00
1<.o7C 54,66ft
v;s.-:~~ o~~ ~.~.;; :::::n~
00.00· G.OO 0.00 3O.ee
REFERENCE INFORMA T¡ON
tn..ag ,",.ace \I'$.K Tal'gO!t
SECTION UETMLS
TVÞ +W-S "EI.IW
MI) 100 ki
AN,ilmTA110NS
Annctatkm
2:fT7PM
11/29/2004
3000 3100 3400 3500
-326
-300
-0
·lOO
--200
--250
-326
WELL DETAJLS
COMPANY DETAILS
SURVEY PROGRAM
ANTJ~COLLISrON SETTINGS
LOhgÍl\!d.'
BPAmoco
D~1Jth Fa' n"'prh Tn
#3
93J5.65 !!<)Ot:U1(}
o
250
200
¡50
lOO
50
50
150
vs
I,'VFLLP¡\TH DETAILS
l'j¡m#3K"Om
50()J.92¡045Ü4
K·D7C
911(),(¡ü
Rig
R"rrMum
K·07(,
SIMi,!g
FwmTVD
<¡O_OO~ (){)O (U)(j 3066
LEGEND
K-03A (K-03A), Major Risk
K-03APBl (K-03APBI), Majo
K-03APB2 (K-03APB2), Majo
K-03 (K-03), Major Risk
K-03 (K-03B), Majpr Risk
K-03 (K-03BPBl), Major Risk
K-06A (K-06A), Major Risk
K-06 (K-06), Major Risk
K-07 (K-07), NOERRORS
K-07 (K-07A), NOERRORS
K-07(K-07APBl), NOERROR
K-07 (K-07APB2), NOERROF
K-07 (K-07B), NOERRORS
K-07(K-07C),NOERRORS
K-13 (Plan K-13A), Major Risi
Plan#3 K -07D
Plan #3
2.21
..
: Plan
)
(K -07 IPlan#3
1000
800
600
200
o I
9000
1)
, ,
.
.
Obp
BP-GDB
A·lticollision Report
...
.....
INTEQ
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There ar~..,ells in thBlI1ebIflan #3 & NOT PLANNED PROGRA \i1
Interpolation Method: MD + Stations Interval: 10.00 1 Error Model: ISCWSA Ellipse
Depth Range: 9320.00 to 11900.00 ft Scan Method: Trav Cylinder North
Maximum Radius: 1386.93 ft Error Surface: Ellipse + Casing
Casing Points
2709.00
6992.00
9189.00
9320.00
11900.00
2708.92
6278.62
8362.02
8491.81
8731.74
13.375
9.625
7.000
4.500
2.875
17.500
12.250
8.500
6.000
3.750
13 3/8"
95/8"
7" :
4 1/21
2 7/8"
I
Plan: Plan #3
Similar to Lamar's Plan #3
Principal: Yes
Date Composed:
Version:
Tied-to:
11/29/2004
1
From: Definitive Path
Summary
PB K Pad K-03A K-03A V3 11600.00 9300.00 1227.83 606.11 621.72 Pass: Major Risk
PB K Pad K-03APB 1 K-03APB 1 V2 11600.00 9300.00 1227.70 605.88 621.81 Pass: Major Risk
PB K Pad K-03APB2 K-03APB2 V2 11600.00 9300.00 1227.70 605.88 621.81 Pass: Major Risk
PB K Pad K-03 K-03 V1 11613.85 9530.00 1196.79 640.56 556.23 Pass: Major Risk
PB K Pad K-03 K-03B V1 10225.00 10690.00 963.57 503.73 459.84 Pass; Major Risk
PB K Pad K-03 K-03BPB1 V6 11500.00 9500.00 1091.62 514.34 577.28 Pass: Major Risk
PB K Pad K-06A K-06A V4 11201.55 10990.00 541.25 392.49 148.76 Pass: Major Risk
PB K Pad K-06 K-06 V2 Plan: Undefine 9420.00 9250.00 597.41 140.97 456.44 Pass: Major Risk
PB K Pad K-07 K-07 V2 10336.53 9810.00 820.05 No Reference Casings
PB K Pad K-07 K-07 A V3 10325.00 10290.00 634.19 No Reference Casings
PB K Pad K-07 K-07APB1 V3 1 0359.46 9930.00 804.56 No Reference Casings
PB K Pad K-07 K-07APB2 V5 10355.03 10280.00 703.85 No Reference Casings
PB K Pad K-07 K-07B V3 10857.29 10530.00 757.61 No Reference Casings
PB K Pad K-07 K-07C V8 9320.00 9320.00 0.00 0.00 0.00 FAIL: NOERRORS
PB K Pad K-13 Plan K-13A V1 Plan: K- 9510.90 10220.00 702.66 128.22 574.43 Pass; Major Risk
11550.00 8760.79 8820.00 8138.36 63.17 112.22 143.92 62.90 4.000 1383.04 488.29 894.75 Pass
11550.00 8760.79 8830.00 8147.60 63.17 112.41 144.26 63.24 4.000 1378.17 490.41 887.76 Pass
11550.00 8760.79 8840.00 8156.85 63.17 112.60 144.60 63.59 4.000 1373.36 492.53 880.84 Pass
11557.01 8760.17 8850.00 8166.10 64.19 113.14 144.03 63.86 4.000 1368.56 498.38 870.17 Pass
11557.82 8760.09 8860.00 8175.36 64.31 113.37 144.28 64.20 4.000 1363.86 500.95 862.91 Pass
11558.63 8760.02 8870.00 8184.62 64.42 113.59 144.52 64.55 4.000 1359.22 503.51 855.71 Pass
11559.43 8759.95 8880.00 8193.88 64.54 113.82 144.77 64.89 4.000 1354.64 506.07 848.57 Pass
11560.24 8759.88 8890.00 8203.14 64.66 114.05 145.02 65.24 4.000 1350.13 508.63 841.50 Pass
11561.05 8759.81 8900.03 8212.44 64.78 114.27 145.28 65.60 4.000 1345.66 511.20 834.47 Pass
11561.85 8759.74 8910.00 8221.68 64.89 114.50 145.54 65.95 4.000 1341.29 513.74 827.54 Pass
11562.66 8759.67 8920.00 8230.95 65.01 114.72 145.80 66.31 4.000 1336.96 516.29 820.67 Pass
11563.47 8759.59 8930.00 8240.22 65.13 114.95 146.06 66.66 4.000 1332.69 518.84 813.85 Pass
11564.28 8759.52 8940.00 8249.48 65.25 115.17 146.32 67.03 4.000 1328.48 521.38 807.10 Pass
11565.09 8759.45 8950.00 8258.75 65.36 115.40 146.59 67.39 4.000 1324.34 523.92 800.42 Pass
11565.90 8759.38 8960.00 8268.01 65.48 115.62 146.86 67.76 4.000 1320.25 526.45 793.80 Pass
11566.71 8759.31 8970.00 8277.28 65.60 115.85 147.13 68.13 4.000 1316.24 528.98 787.26 Pass
11567.52 8759.23 8980.00 8286.54 65.72 116.07 147.40 68.50 4.000 1312.28 531.50 780.78 Pass
11568.34 8759.16 8990.00 8295.80 65.84 116.29 147.68 68.87 4.000 1308.39 534.02 774.38 Pass
All Measurements are from top of Riser
11/29/2004
~
Q)
(/)
.-
cr:
K-07D
top of bag
r
"'
BAG
71/16" 5000 psi.
'-.
~
bttm of bag
middle of slips
,Blind/Shears
..........................
middle of pipes
TOTs
23/8" combi ram/slips 1..........................71/16" 5000psi
...........
...........
middle of flow cross
Mud Cross
Mud Cross
7 1/16" 5000psi
"---"
.............
middle of pipe/slips
I variable bore pipe 31/2"-27/8"
I 23/8" combi ram/sUps
~L"N ~
t··
........................
TOTs
1......................····7 1/16" 5000psi
middle of blind/shears
Flow Tee
TERRIE L HUBBLE
BP EXPLORATION AK INC
PO BOX 196612 MB 7-5
ANCHORAGE, AK 99519-6612
89-6/1252
163
"Mastercard Check"
DATE l \. W· DC(
PAY TO THE ~ ~ QI() ,lln /~Cr" $ (rì7ì C{)
ORDER OF ,IDA..r~ '- I l.Ã../.
Ol\Q ~ cr6J (t'). (lJÐ ~~~~-~-----~---'------uúLLAKS
First National Bank Alaska
Anchorage, AK 99501 ~ "'- ,# W. ¡J / /_
MEMO \<-D7D ~t7\. ~
.
I: ;¡. 2 5 2000 ¡; 0 I: ~ ~ ;¡.... II' ¡; 2 2 7 II' ;¡. 5 5 ¡; II- O;¡. ¡; :1
.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME f/¿ ¿{
l:-ò7LJ
PTD# 2oC¡- 292-
Development
Service
CHECK WßA T
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two. (2) digits
are between 6.0-69)
Exploration
Stratigraphic
~'CLUE".
Tbe permit is for a new weJlbore segment of
existing weD - .
Permit No, .' API No.
Production. sbould continue to be reported as
a function 'of tbe original API number. stated
above.
HOLE ]n accordance witb 2.0 AAC 25..0.05(1), aU
records, data and logs acquired for tbe pilot
bole must be clearly differentiated In botb
name (name on permit plus PH)
and API Dumber (5.0
7.0/80) from records, data and logs acquired
for we)) (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved su bj ect ·10 fuD
compliance witb 20 AAC 25.0SS~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing exception.
(Company Name) assumes tbe liability of any
protest to tbe spacing . e:JCeption tbat may
occur.
AU dry djtcb sample sets submitted to tbe
Commission must be in no greater -tban 3D'
sample intervals from below tbe permafrost
or from where samples are first caugbt and
]0' sample iIiter:vals tbrough target zones.
.
.
o
o
Well bore seg
Annular Disposal
-.--
-
Field & Pool PRUDHOE SAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT K:..07D Program DEV
PTD#: 2042420 Company SP EXPLORATION (ALASKA) INC _ Initial ClasslType _DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore On
Administration 1 P.ermit fee attached . - - - - - - · Yes
2 .Leas.e .numberappropriate. · Yes. - ~ - - - -
3 .U.nlque weltn.am~.and ol!mb.er . . . . . . . . . . . . . . . . . . . . . . ...__...y.es. - - - - + - - - - - - - - - - - - - - -
4 Well .located in a. d.efined .pOOI. · Yes.
'5 WelUocat~d proper .distance from driJling unilbound.ary . · Yes.
6 Well .located properdlstance from otber welJs Yes.
7 .S.ufficientacreage.ayailable in dJilliog lInjt. - - - - - - · Yes.
8 Jf.d~vi<lted, js. weUbofe platincJuded . . . · Y.es. - - - - -
9 .Qperator onl}' affected party. · Yes.
10 .Qperator bas.appropriate. bond inJQrçe . . . . . . . . . . . . . . . . . ........ Yes. ~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ M _
11 Permit GaO Þe iSSl!ed wjtbout co.nserva.tion order. Yes.
Appr Date 12 Permit Gan Þe iSSl!ed wjtbout administratille.appr.oval . . . Y~s
RPC 12/2/2004 13 Can permit be approved before 15-day wait Yes
14 Well .located within area and strata authorized by lojectioo Ord.er # (put 10# in. cornm.eots). (For .NA .
15 .AJI w~lJs.wit.htn.1l4ßli[e.aJea.oJ reyieW jd~otified (Fpr servj~.well Only). . . . . . _ . . . . . . . . .NA. . - - - - - - - - - - - - - - - + - - - -
16 PJE~-produced. injector;dur.ation.of pre-productiolJ less than 3 montbs (For.service well onJy) . . .NA - - - - -
17 ACMP F:indingof Consistency. has Þeenissued for this project .NA.
Engineering 18 Cooductor string. PJovided . - - - - - - NA. - - - - -
19 S.udacecasing. p.rotec.ts all known USDWs . . . . . . .NA.
20 CMT vol adeQl!ateto circulate on .conductor & surf csg . . .NA
21 CMT vol adequate to tie-inJongstring tosuó csg. .NA. - - - - - -
122 .CMT will coyeraJI koown.productive horizons. . . · .No Slotted,
23 .Casing designs ad.etllla.te tor C,. T, B&. permafrost · Yes
24 Adequate tan.kage Of reserve pit . · Yes. CTDU.
25 Jfa. rß-driII, has a t 0-403 for abandonment beeo approvßd . - - - - - · Y~s. 12101/2004. .
26 Adßquate.wellbore separ¡¡tjo.n .proposed. - - - - - - - - - - - - - - - ...... Yes. - - . - - - - - - - - - - - - - ~ - - -
27 .If diverter Jeq.uiJed, doe.s it meet fßgulatiolJs. NA Sidetrack. .
Appr Date 28 .D.rilliog fJujd. program schematic.& eq.uipJistadequ¡¡te. - - - - - - Y~s M<lxMW8,9.ppg, . .
WGA 12/3/2004 29 S.o.PEs,. d.o they meet rßgu.lation . - - - - -- · Yes. - - - - -
30 .BOPE.press ratiog appropriate;.test to.(put psig in.commßnts}. . . . . . .... Yes. Test to.350Q psi.MSP 2272 psi.
31 Choke manjfold complies wlAPI Rp-53 (May 84). · Yes.
32 Work wiJI occur withoutoper¡¡tion .shl!tdown. . · Y.es. - - - - -
33 .Is presence. of H2S gas. probaþle. - - - - - · .No. Not.anH2S pad..
34 Meçha.nic¡¡I.cood.it[onof wells wlthin ,ð.OB veriJied. (for service wßIJ only) NA
--
Geology 35 P~rmit Gan Þe iSSl!ed w!o hydrogen sulfide mßaswes . No
36 .D.ata. pJeseoted on. potential ove.rpressuœ .zone.s. . . .NA
Appr Date 37 .S~tsmicaJ1aIY$js of sballow 9as.zJ)oes. NA
RPC 38 S.eabed .condjtioo survey (if off-shore} . · .NA
39 . Contact namelp.honeJorweelsly progrßssrßPorts [expIQratJ)ryonIYl .NA
Geologic Date: Engineering Date ~y
Commissioner: Commissioner
üT-f' Ie! J)1--
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
,.
.
Sperry-Sun Drilling Services
LIS Scan Utility
.
:?> I:J v( v Ìv y 7.-
Þ [)ì--~ ~
$Revision: 3 $
LisLib $Revision: 4 $
Tue Aug 02 10:42:29 2005
Reel Header
Service name.. . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name..... ..UNKNOWN
Comments................ .STS LIS Writing Library.
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
K-07D
500292104504
BP Exploration (Alaska) Inc.
Sperry Sun
02-AUG-05
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003480609
B. JAHN
B. LAULE / R
MWD RUN 2
MW0003480609
B. JAHN
B. LAULE / R
MWD RUN 3
MW0003480609
B. JAHN
B. LAULE / R
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0003480609
B. JAHN
B. LAULE / R
MWD RUN 7
MW0003480609
S. LATZ
D. HILDRETH
MWD RUN 8
MW0003480609
S. LATZ
D. HILDRETH
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
4
llN
14E
2041
473
54.66
26.21
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
.
BIT SIZE (IN)
4.125
SIZE (IN) DEPTH (FT)
4.500 9323.0
.
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED
DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT 9316'MD
AND THE BOTTOM WAS AT 9323'MD IN THE K-07C WELLBORE.
4. MWD RUNS 1,2,& 7 COMPRISED DIRECTIONAL AND NATURAL
GAMMA RAY (PCG) UTILIZING
SCINTILLATION DETECTORS. TIE-IN SGRD DATA ACQUIRED
WHILE RIH FOR MWD RUN 1
WERE MERGED WITH MWD DATA FROM RUN 1. RUN 5 WAS A
CLEAN-OUT RUN - NO DATA
WERE ACQUIRED. RUN 6 WAS A FAILED WHIPSTOCK RUN. AN
OPENHOLE SIDETRACK WAS
SUCCESSFULLY EFFECTED ON MWD RUN 7, EXITING K-07D
PB1 AT 10185'MD.
5. MWD RUNS 3,4,& 8 COMPRISED DIRECTIONAL, DUAL GAMMA
RAY (GM) UTILIZING GEIGER
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4)
6. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A
SCHLUMBERGER CASED-HOLE
GAMMA RAY LOG RUN IN K-07D ON 17 January 2005. THESE
PDC DATA WERE PROVIDED
BY D.DORTCH (SIS/BP) ON 21 JULY 2005, AS AUTHORIZED
BY JAMES DEAN (BP). LOG
HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES.
7. MWD RUNS 1-4,7,8 REPRESENT WELL K-07D WITH API#:
50-029-21045-04. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 11901'MD/8674'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURAL GAMMA RAY.
SEXP SMOOTHED PHASE SHIFT-DERIVED
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
RESISTIVITY (EXTRA
RESISTIVITY (SHALLOW
RESISTIVITY (MEDIUM
RESISTIVITY (DEEP
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
.
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
1
.
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
9199.5
9307.0
9307.0
9307.0
9307.0
9307.0
9333.5
STOP DEPTH
11855.5
11868.5
11868.5
11868.5
11868.5
11868.5
11899.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
9199.5
9202.5
9215.0
9218.0
9229.5
9235.0
9237.0
9239.5
9247.0
9249.5
9265.0
9275.0
9293.5
9301.5
9312.5
9316.0
9318.0
9332.0
9342.0
9343.5
9350.5
9358.5
9367.0
9377.0
9380.0
9403.5
9412.0
9428.5
9454.0
9465.5
9471.0
9478.5
9494.0
9499.5
9506.5
9510.5
9522.0
9540.0
9564.5
9570.5
9587.5
9590.0
9624.0
9654.0
GR
9200.5
9203.5
9215.5
9218.0
9229.5
9236.5
9238.0
9239.5
9247.5
9249.5
9266.5
9276.0
9291.5
9299.0
9311. 5
9316.0
9318.0
9331.5
9342.0
9343.5
9350.5
9358.0
9365.5
9376.0
9379.0
9403.0
9410.5
9426.5
9453.0
9464.0
9470.5
9476.5
9493.0
9498.0
9506.0
9509.5
9520.5
9538.5
9563.0
9569.5
9586.0
9588.5
9622.5
9654.0
-------.
9665.0
9668.0
9671. 0
9683.5
9719.5
9724.0
9731.5
9738.5
9752.5
9792.5
9829.5
9834.0
9873.5
9930.5
10015.0
10043.5
10074.0
10082.5
10094.5
10182.0
10199.5
10223.0
10338.5
10370.5
10403.5
10421.0
10440.5
10455.5
10481.5
10564.5
10616.5
10633.0
10689.5
11052.0
11069.5
11097.5
11164.5
11200.0
11373.5
11461.0
11468.5
11481.0
11491.0
11498.5
11508.0
11547.5
11596.0
11706.5
11735.0
11815.5
11899.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
.
9663.5
9667.0
9670.5
9683.0
9716.0
9720.5
9729.5
9737.0
9751.0
9791.0
9829.5
9834.5
9874.5
9929.0
10012.5
10041.5
10074.0
10079.0
10093.0
10181.0
10198.5
10221.5
10341.0
10372.0
10403.0
10420.5
10441.0
10454.5
10480.0
10563.0
10616.5
10632.0
10688.0
11050.0
11069.5
11096.5
11162.5
11198.0
11373.0
11463.0
11472.0
11482.5
11492.5
11500.5
11508.5
11547.0
11596.5
11709.5
11738.5
11817.5
11901.0
BIT RUN NO
1
2
3
4
7
8
MERGED MAIN PASS.
$
MERGE TOP
9200.5
9407.0
9778.0
10064.0
10185.0
10240.0
#
Data Format Specification Record
Data Record Type..................O
.
MERGE BASE
9407.0
9778.0
10064.0
10185.0
10240.0
11901.0
.
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9199.5 11899 10549.3 5400 9199.5 11899
ROP MWD FT/H 0.05 1216.19 82.7472 5132 9333.5 11899
GR MWD API 15.54 1027.8 62.4521 5301 9199.5 11855.5
RPX MWD OHMM 0.32 137.74 32.8978 5124 9307 11868.5
RPS MWD OHMM 0.12 2000 41.8908 5124 9307 11868.5
RPM MWD OHMM 0.11 2000 42.833 5124 9307 11868.5
RPD MWD OHMM 0.07 2000 73.7413 5124 9307 11868.5
FET MWD HOUR 0.18 78.38 5.2955 5124 9307 11868.5
First Reading For Entire File......... .9199.5
Last Reading For Entire File.......... .11899
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
2
header data for each bit run in separate files.
1
.5000
.
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
START DEPTH
9200.5
9333.0
STOP DEPTH
9376.5
9407.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing............... ..... .60 .1IN
Max frames per record............ . Undefined
Absent value.................... ..-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
07-JAN-05
Insite
7.75
Memory
9407.0
9333.0
9407.0
15.7
17.2
TOOL NUMBER
TLGO 11
4.125
9323.0
Flo Pro
8.60
.0
9.0
21000
5.8
.000
.000
.000
.000
.0
129.0
.0
.0
Name Service Order
DEPT
ROP MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
GR
MWDOI0
API
.
4
1 68
8
3
.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9200.5 9407 9303.75 414 9200.5 9407
ROP MWDOI0 FT/H 0.05 40.87 9.81956 149 9333 9407
GR MWDOI0 API 16.19 1027.8 83.1469 343 9200.5 9376.5
First Reading For Entire File......... .9200.5
Last Reading For Entire File.......... .9407
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name........... ..STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............ . . . .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
9377.0
9407.5
STOP DEPTH
9747.5
9778.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
07-JAN-05
Insite
7.75
Memory
9778.0
9407.0
9778.0
20.6
82.8
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
TOOL NUMBER
TLGOll
.
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Units
FT
FT/H
API
Rep
68
68
68
Code
Size
4
4
4
Nsam
1
1
1
MWD020
MWD020
.
4.125
9323.0
Flo Pro
8.60
.0
9.1
21000
5.8
.000
.000
.000
.000
.0
137.5
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9377 9778 9577.5 803 9377 9778
ROP MWD020 FT/H 5.29 370.98 57.3161 742 9407.5 9778
GR MWD020 API 15.54 147.01 36.2307 742 9377 9747.5
First Reading For Entire File......... .9377
Last Reading For Entire File.......... .9778
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
.
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPM
FET
RPS
RPX
RPD
GR
ROP
$
4
.
header data for each bit run in separate files.
3
.5000
START DEPTH
9305.0
9305.0
9305.0
9305.0
9305.0
9748.0
9778.5
STOP DEPTH
10033.5
10033.5
10033.5
10033.5
10033.5
10020.0
10064.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
08-JAN-05
Insite
4.3
Memory
10064.0
9778.0
10064.0
87.9
91. 5
TOOL NUMBER
78005
171170
3.750
9323.0
Flo Pro
8.60
49.0
9.1
21000
506.0
.195
.088
.160
60.0
141. 4
60.0
·
MUD CAKE AT MT:
.200
6.
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9305 10064 9684.5 1519 9305 10064
ROP MWD030 FT/H 6.32 1191. 95 99.4352 572 9778.5 10064
GR MWD030 API 30.62 110.77 66.4186 545 9748 10020
RPX MWD030 OHMM 0.32 64.95 23.7176 1458 9305 10033.5
RPS MWD030 OHMM 0.12 2000 50.7872 1458 9305 10033.5
RPM MWD030 OHMM 0.11 2000 57.0235 1458 9305 10033.5
RPD MWD030 OHMM 0.07 2000 111.055 1458 9305 10033.5
FET MWD030 HOUR 0.27 51.63 12.3669 1458 9305 10033.5
First Reading For Entire File......... .9305
Last Reading For Entire File.......... .10064
File Trailer
Service name........... ..STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type...... . . . . . . . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
.
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
5
.
header data for each bit run in separate files.
4
.5000
START DEPTH
10020.5
10034.0
10034.0
10034.0
10034.0
10034.0
10064.5
STOP DEPTH
10185.0
10185.0
10185.0
10185.0
10185.0
10185.0
10185.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
12 -JAN-05
Insite
4.3
Memory
10185.0
10064.0
10185.0
84.1
96 .4
TOOL NUMBER
78005
171170
3.750
9323.0
Flo Pro
8.60
65.0
9.0
23000
.0
.160
.084
.160
.220
65.0
129.4
65.0
60.0
.
.
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10020.5 10185 10102.8 330 10020.5 10185
ROP MWD040 FT/H 1.4 142.54 73.9909 242 10064.5 10185
GR MWD040 API 50.75 84.42 62.8885 330 10020.5 10185
RPX MWD040 OHMM 7.44 45.72 29.0449 303 10034 10185
RPS MWD040 OHMM 8.16 44.26 32.0704 303 10034 10185
RPM MWD040 OHMM 8.45 40.89 31.6335 303 10034 10185
RPD MWD040 OHMM 13 .44 66.4 41.3064 303 10034 10185
FET MWD040 HOUR 0.3 74.29 16.3147 303 10034 10185
First Reading For Entire File......... .10020.5
Last Reading For Entire File.......... .10185
File Trailer
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.005
.
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
6
.
header data for each bit run in separate files.
7
.5000
START DEPTH
10185.5
10185.5
STOP DEPTH
10212.0
10240.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
14-JAN-05
Insite
7.75
Memory
10240.0
10185.0
10240.0
83.5
89.5
TOOL NUMBER
TLG011
3.750
9323.0
Flo Pro
8.60
.0
9.0
23000
5.8
.000
.000
.000
.000
.0
137.5
.0
.0
.
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Nsam
1
1
1
Units
FT
FT/H
API
Size
4
4
4
MWD070
MWD070
.
Rep
68
68
68
Code
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10185.5 10240 10212.8 110 10185.5 10240
ROP MWD070 FT/H 0.79 100.89 51.0542 110 10185.5 10240
GR MWD070 API 57.26 67.38 62.2589 54 10185.5 10212
First Reading For Entire File......... .10185.5
Last Reading For Entire File.......... .10240
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type..... .. . . .. .. . . . LO
Next File Name......... ..STSLIB.007
Physical EOF
File Header
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
7
header data for each bit run in separate files.
8
.5000
START DEPTH
10185.5
10185.5
10185.5
10185.5
10185.5
10212.5
10240.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
STOP DEPTH
11870.5
11870.5
11870.5
11870.5
11870.5
11857.5
11901.0
17-JAN-05
Insite
.
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
ELECTROMAG.
RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.............. ...Down
Optical log depth units......... ..Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.. .......... . Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
4.3
Memory
11901.0
10240.0
11901.0
.
83.5
97.5
TOOL NUMBER
78005
171170
3.750
9323.0
Flo Pro
8.60
65.0
9.1
25000
5.6
.130
.060
.180
.150
65.0
150.0
65.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FT/H 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
RPX MWD080 OHMM 4 1 68 12 4
RPS MWD080 OHMM 4 1 68 16 5
RPM MWD080 OHMM 4 1 68 20 6
RPD MWD080 OHMM 4 1 68 24 7
FET MWD080 HOUR 4 1 68 28 8
· .st
Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10185.5 11901 11043.3 3432 10185.5 11901
ROP MWD080 FT/H 0.85 1216.19 90.4006 3322 10240.5 11901
GR MWD080 API 48.34 145.01 65.3775 3291 10212.5 11857.5
RPX MWD080 OHMM 13.01 137.74 37.2186 3371 10185.5 11870.5
RPS MWD080 OHMM 14.84 85.18 40.1048 3371 10185.5 11870.5
RPM MWD080 OHMM 15.02 71.56 38.8708 3371 10185.5 11870.5
RPD MWD080 OHMM 24.68 314.67 61.7007 3371 10185.5 11870.5
FET MWD080 HOUR 0.18 78.38 1.32146 3371 10185.5 11870.5
First Reading For Entire File......... .10185.5
Last Reading For Entire File.......... .11901
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.008
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.................... .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments.............. ...STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date.................... .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
$Revision: 3 $
LisLib $Revision: 4 $
Tue Aug 02 10:22:43 2005
/-t 0 v1 ¿?v VI 1-
# /3)W7
Sperry-Sun Drilling Services
LIS Scan Utility
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.... ..01
Previous Reel Name..... ..UNKNOWN
Comments............... ..STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.. . . . . . . . . . . .LISTPE
Date.................... .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name. . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
K-07Dpb1
500292104572
BP Exploration (Alaska) Inc.
Sperry Sun
02-AUG-05
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0003480609
B. JAHN
B. LAULE / R
MWD RUN 2
MW0003480609
B. JAHN
B. LAULE / R
MWD RUN 3
MW0003480609
B. JAHN
B. LAULE / R
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0003480609
B. JAHN
B. LAULE / R
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
4
UN
14E
2041
473
54.66
26.21
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 4.500 9323.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED
DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT 9316'MD
AND THE BOTTOM WAS AT 9323'MD IN THE K-07C WELLBORE.
4. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL AND NATURAL
GAMMA RAY (PCG) UTILIZING
SCINTILLATION DETECTORS. TIE-IN SGRD DATA ACQUIRED
WHILE RIH FOR MWD RUN 1
WERE MERGED WITH MWD DATA FROM RUN 1.
5. MWD RUNS 3 & 4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY
(GM) UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4)
6. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A
SCHLUMBERGER CASED-HOLE
GAMMA RAY LOG RUN IN K-07D ON 17 January 2005. THESE
PDC DATA WERE PROVIDED
BY D.DORTCH (SIS/BP) ON 21 JULY 2005, AS AUTHORIZED
BY JAMES DEAN (BP). LOG
HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES.
7. MWD RUNS 1-4 REPRESENT WELL K-07D PB1 WITH API#:
50-029-21045-72. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 10845'MD/8732'TVDSS.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURAL GAMMA RAY.
SEXP SMOOTHED PHASE SHIFT-DERIVED
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
$
RESISTIVITY ( EXTRA
RESISTIVITY ( SHALLOW
RESISTIVITY (MEDIUM
RESISTIVITY (DEEP
File Header
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
SGRD
GR
SFXE
SEDP
SEMP
SESP
SEXP
FET
RPD
RPM
RPS
RPX
SROP
ROP
$
clipped curves; all bit runs merged.
.5000
START DEPTH
9199.5
9199.5
9307.0
9307.0
9307.0
9307.0
9307.0
9307.0
9307.0
9307.0
9307.0
9307.0
9333.0
9333.0
STOP DEPTH
10802.0
10802.0
10814.5
10814.5
10814.5
10814.5
10814.5
10814.5
10814.5
10814.5
10814.5
10814.5
10845.0
10845.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
9199.5
9202.5
9215.0
9218.0
9229.5
9235.0
9237.0
9239.5
9247.0
9249.5
9265.0
9275.0
9293.5
9301.5
9312.5
9316.0
9318.0
9332.0
9342.0
9343.5
9350.5
9358.5
9367.0
9377.0
9380.0
9403.5
9412.0
9428.5
9454.0
9465.5
9471.0
9478.5
9494.0
9499.5
9506.5
9510.5
9522.0
9540.0
9564.5
9570.5
9587.5
9590.0
GR
9200.5
9203.5
9215.5
9218.0
9229.5
9236.5
9238.0
9239.5
9247.5
9249.5
9266.5
9276.0
9291. 5
9299.0
9311.5
9316.0
9318.0
9331.5
9342.0
9343.5
9350.5
9358.0
9365.5
9376.0
9379.0
9403.0
9410.5
9426.5
9453.0
9464.0
9470.5
9476.5
9493.0
9498.0
9506.0
9509.5
9520.5
9538.5
9563.0
9569.5
9586.0
9588.5
9624.0
9654.0
9665.0
9668.0
9671.0
9683.5
9719.5
9724.0
9731.5
9738.5
9752.5
9792.5
9829.5
9834.0
9873.5
9930.5
10015.0
10043.5
10074.0
10082.5
10094.5
10182.0
10199.5
10223.0
10338.5
10370.5
10402.5
10420.5
10446.5
10455.5
10845.0
$
9622.5
9654.0
9663.5
9667.0
9670.5
9683.0
9716.0
972 0.5
972 9.5
9737.0
9751.0
9791.0
9829.5
9834.5
9874.5
9929.0
10012.5
10041.5
10074.0
10079.0
10093.0
10181. 0
10198.5
10221.5
10341.0
10372.0
10403.0
10421. 5
10448.0
10456.0
10845.5
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
BIT RUN NO
1
2
3
4
MERGE TOP
9200.5
9377.0
9305.0
10020.5
MERGE BASE
9407.0
9778.0
10064.0
10845.5
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9199.5 10845 10022.3 3292 9199.5 10845
ROP MWD FT/H 0.05 1191. 95 76.6475 3025 9333 10845
GR MWD API 15.54 1027.8 70.7743 3194 9199.5 10802
RPX MWD OHMM 0.32 64.95 25.2181 3016 9307 10814.5
RPS MWD OHMM 0.12 2000 38.1265 3016 9307 10814.5
RPM MWD OHMM 0.11 2000 41. 0833 3016 9307 10814.5
RPD MWD OHMM 0.07 2000 70.5777 3016 9307 10814.5
FET MWD HOUR 0.27 74.29 7.96843 3016 9307 10814.5
First Reading For Entire File......... .9199.5
Last Reading For Entire File.......... .10845
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Next File Name......... ..STSLIB.002
Physical EOF
File Header
Service name........... ..STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
SGRD
GR
SROP
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
9200.5
9200.5
9332.5
9332.5
STOP DEPTH
9376.5
9376.5
9407.0
9407.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
07-JAN-05
Insite
7.75
Memory
9407.0
9333.0
9407.0
15.7
17.2
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Rep
68
68
68
Code
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
MWD010
MWD010
TOOL NUMBER
TLG011
4.125
9323.0
Flo Pro
8.60
.0
9.0
21000
5.8
.000
.000
.000
.000
.0
129.0
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9200.5 9407 9303.75 414 9200.5 9407
ROP MWD010 FT/H 0.05 385.34 12.323 150 9332.5 9407
GR MWD010 API 16.19 1027.8 83.1469 343 9200.5 9376.5
First Reading For Entire File......... .9200.5
Last Reading For Entire File.......... .9407
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name. . .
Version Number......... ..1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name........... ..STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
SGRD
GR
SROP
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
9377.0
9377.0
9407.5
9407.5
STOP DEPTH
9747.5
9747.5
9778.0
9778.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
PCG
$
BOTTOM)
TOOL TYPE
Natural gamma ray
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
07-JAN-05
Insite
7.75
Memory
9778.0
9407.0
9778.0
20.6
82.8
TOOL NUMBER
TLGOll
4.125
9323.0
Flo Pro
8.60
.0
9.1
21000
5.8
.000
.000
.000
.000
.0
137.5
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWD020
MWD020
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9377 9778 9577.5 803 9377 9778
ROP MWD020 FT/H 5.29 983.51 60.4396 742 9407.5 9778
GR MWD020 API 15.54 147.01 36.2307 742 9377 9747.5
First Reading For Entire File......... .9377
Last Reading For Entire File.......... .9778
File Trailer
Service name........... ..STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record..65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
SFXE
SEDP
SEMP
SESP
SEXP
FET
RPD
RPM
RPS
RPX
SGRC
GR
SROP
ROP
$
header data for each bit run in separate files.
3
.5000
START DEPTH
9305.0
9305.0
9305.0
9305.0
9305.0
9305.0
9305.0
9305.0
9305.0
9305.0
9748.0
9748.0
9778.5
9778.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
#
BOTTOM)
TOOL TYPE
Dual GR
Electromag.
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
STOP DEPTH
10033.5
10033.5
10033.5
10033.5
10033.5
10033.5
10033.5
10033.5
10033.5
10033.5
10020.0
10020.0
10064.0
10064.0
Res. 4
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
08-JAN-05
Insite
4.3
Memory
10064.0
9778.0
10064.0
87.9
91. 5
TOOL NUMBER
78005
171170
3.750
9323.0
Flo Pro
8.60
49.0
9.1
21000
5.6
.195
.088
.160
.200
60.0
141. 4
60.0
60.0
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9305 10064 9684.5 1519 9305 10064
ROP MWD030 FT/H 6.32 1191.95 99.4352 572 9778.5 10064
GR MWD030 API 30.62 110.77 66.4186 545 9748 10020
RPX MWD030 OHMM 0.32 64.95 23.7176 1458 9305 10033.5
RPS MWD030 OHMM 0.12 2000 50.7872 1458 9305 10033.5
RPM MWD030 OHMM 0.11 2000 57.0235 1458 9305 10033.5
RPD MWD030 OHMM 0.07 2000 111.055 1458 9305 10033.5
FET MWD030 HOUR 0.27 51.36 12.3667 1458 9305 10033.5
First Reading For Entire File......... .9305
Last Reading For Entire File.......... .10064
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
SGRC
GR
SEDP
SEMP
SESP
SEXP
SFXE
RPD
RPM
RPS
RPX
FET
SROP
ROP
$
header data for each bit run in separate files.
4
.5000
START DEPTH
10020.5
10020.5
10034.0
10034.0
10034.0
10034.0
10034.0
10034.0
10034.0
10034.0
10034.0
10034.0
10064.5
10064.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
GM
EWR4
$
BOTTOM)
TOOL TYPE
Dual GR
Electromag.
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
STOP DEPTH
10802.5
10802.5
10815.0
10815.0
10815.0
10815.0
10815.0
10815.0
10815.0
10815.0
10815.0
10815.0
10845.5
10845.5
Res. 4
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
12 -JAN-05
Insite
4.3
Memory
10845.0
10064.0
10845.0
84.1
96.4
TOOL NUMBER
78005
171170
3.750
9323.0
Flo Pro
8.60
65.0
9.0
23000
.0
.160
.084
.160
.220
65.0
129.4
65.0
60.0
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10020.5 10845.5 10433 1651 10020.5 10845.5
ROP MWD040 FT/H 0.22 672.33 81.9575 1563 10064.5 10845.5
GR MWD040 API 50.75 174.69 85.7358 1565 10020.5 10802.5
RPX MWD040 OHMM 7.44 45.72 26.5888 1563 10034 10815
RPS MWD040 OHMM 8.16 45.94 28.8289 1563 10034 10815
RPM MWD040 OHMM 8.45 50.7 28.7064 1563 10034 10815
RPD MWD040 OHMM 13.08 75.74 35.3099 1563 10034 10815
FET MWD040 HOUR 0.28 74.29 4.02797 1563 10034 10815
First Reading For Entire File......... .10020.5
Last Reading For Entire File.......... .10845.5
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .05/08/02
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.................... .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date.................... .05/08/02
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File