Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
204-241
STATE OF ALASKA OLASKA OIL AND GAS CONSERVATION COMMISS N WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil ❑ Gas 0 SPLUG 0 Other 0 Abandoned m ' Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development Id Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero ' Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 8/6/2016 t% 204-241 • 316-263 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 2/12/2005 50-029-22540-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 3/8/2005 PBU NK-38A • Surface: 1410'FSL,854'FEL,Sec.36,T12N,R15E,UM • 9 Ref Elevations KB 48.4 • 17. Field/Pool(s): Top of Productive Interval: 3447'FSL,603'FEL,Sec.25,T12N,R15E,UM GL 19.5 • BF 22.03 • PRUDHOE BAY,RAVEN OIL • Total Depth: 4800'FSL,566'FEL,Sec.25,T12N,R15E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 14227'/9906' • ADL 034630 - 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 721706 •y- 5979950 • Zone - ASP4 . 16765'/9923' • 84-062 TPI: x- 721740 y- 5987271 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20. Thickness of Permafrost MD/TVD: Total Depth:x- 721736 y- 5988624 Zone - ASP4 None 1800'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No RI 13. Water Depth,if Offshore: 21. Re-drill/LateralIfVD: Top Window MD Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) • 9163'/6510'• 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 MC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary DIR/GR/RES,DIR/GR/RES/NEU,DIR/GR/RES/NEU/ABI,MDT �`A�NEp SEP 3 0 2015 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FF. PULLED TOP BOTTOM TOP BOTTOM 20" 94# H-40 30' 109' 30' 109' 30" 260 sx Arctic Set(Approx.) 13-3/8" 68# NT-80 29' 4533' 29' 4202' 16" 1418 sx PF'E',375 sx Ciass'G' 9-5/8" 47# L-80/NT-805 26' 9163' 26' 6510' 12-1/4" 352 sx Class'G' 7" 26# L-80 9003' 13534' 6441' 9598' 8-1/2" 184 sx Class'G' 4-1/2" 11.6# L-80 13372' 16763' 9482' 9923' 6-1/8" 399 sx Class'G' 24. Open to production or injection? Yes 0 No 0 . 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 13381' 13196'/9354' x 4-1/2"12.6#L-80 13324'/9447' (t N Oc,'N-00 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. OWI Lt..I °N RECEIVED Was hydraulic fracturing used during completion? Yes 0 No O. yc\'/'•TL Per 20 AAC 25.283(i)(2)attach electronic and printed 8/69j(Cinformation VERIFIED AUG 24 2015 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED L AOG a M 14227' Set Whipstock 27. , PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period .....► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(cord: Press 24 Hour Rate """. Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only ic 1/77-1/77- 5/31 //( 4 DMS (---1--AUG(---1--AUG 2 9 2016 8°Z./6 •28. CORE DATA Conventional Core(s) Yes 0 No 8 r Sidewall Cores Yes 0 No I If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No I Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 15408' 9905 separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. West Sak 9779' 6810' Colville Mudstone 10634' 7385' K-3 12506' 8819' HRZ 12692' 8971' Kuparuk 12948' 9174' LCU/Kingak 12974' 9193' Sag River 13521' 9589' Shublik 13637' 9668' Sadlerochit-Zone 4 13789' 9754' Zone 2C 13892' 9801' Zone 2B 13990' 9839' Zone 2A 14258' 9912' Zone 1A(Fault) 15408' 9905' Zone 1B 15772' 9901' Base of Sadlerochit/Kavik 16700' 9917' Formation at total depth: 31. List of Attachments: Summary of Pre Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ciolkosz,Ryan R Email: Ryan.Ciolkosz@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Okk.._ Phone: +1 907 564 4091 Date: Uad/i INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only i • NK-38A Well History (Pre-Rig Sidetrack) ACTIVITYDAT ***CONT FROM 7-4-16 WSR*** (ctd) SET 4-1/2"WCS IN XN NIPPLE AT 13,368' MD. LRS FREEZE PROTECTED FLOWLINE &TBG.(see Irs log) PULLED RK-LGLV FROM ST#5 ©4,928' MD. SET RK-DGLV IN ST#5 ©4,928' MD. LRS DISPLACED IA W/520 BBLS OF DIESEL.(see Irs log) PULL BK-OGLV FROM STA.#3 AT 9,156' MD SET BK-OGLV(24/64") IN STA. #3 AT 9,156' MD 7/5/2016 ***CONT ON 7-6-16 WSR**" T/I/O= 1340/1400/800 Temp= S/I Assist Slickline (Pre CTD- SP CIBP) Pumped 7 bbls 60/40 down flowline and 38 bbls of 60/40 down Tbg for freeze protect. Pumped 3 bbls of 60/40 meth followed by 520 bbls of 50*F diesel down IA to load. IA,OA=otg FWHP= 7/5/2016 1550/74/630. Tags and AFE sign hung. Slickline on well upon departure, DSO notified. ***CONT FROM 7-5-16 WSR*** (ctd) PULL RK-DGLV FROM STA.#5 AT 4,928' MD SET RK-LGLV IN STA.# 5 AT 4,928' MD PULL EMPTY 4-1/2"WCS FROM 13,368' MD RAN 20' x 3.70" DUMMY WHIPSTOCK, STOP DUE TO DEVIATION AT 14,010' SLM 7/6/2016 ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** ***CONT FROM 7-5-16 WSR*** (ctd) PULL RK-DGLV FROM STA.#5 AT 4,928' MD SET RK-LGLV IN STA.#5 AT 4,928' MD PULL EMPTY 4-1/2" WCS FROM 13,368' MD RAN 20' x 3.70" DUMMY WHIPSTOCK, STOP DUE TO DEVIATION AT 14,010' SLM 7/6/2016 ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** ***WELL SHUT IN UPON ARRIVAL*** (SLB ELINE - MILL XN, WHIPSTOCK) INITIAL T/I/O = 1050/700/700 RUN 1: RIH W/3.806"WELLTEC MILL. OAL = 35', OAW 550#. MILL XN NIPPLE AT 13,368' MD TO 3.80". TIED INTO LINER SUMMARY DATED 02-MAR-2005. LRS L&K WELL. SEE LRS WSR FOR SUMMARY. RUN 2: RIH W/3.70" BAKER 45KB PACKER WHIPSTOCK. OAL= 52', OAW 500#. 7/9/2016 ***JOB CONTINUED ON 10-JULY-16*** T/I/0=1106/757/746. Load &test w/ E-line (Pre CTD) Spear into tbg w!3 bbls neat meth 7/9/2016 followed by 360 bblsl% KCL/Safe-Lube mixture to load tbg. ***Job continued to 7-10-16*** ***Job continued from 7-9-16***, Load &test w/ E-line, (Pre CTD), MIT-T ***inconclusive***to 2500 psi, Pumped 40 bbls diesel down TBG for freeze protect, Whipstock set by E-line, Pumped 37 bbls diesel down TBG to reach test pressure, 1st 15 min TBG lost 24 psi, 2nd 15 min TBG gained 8 psi, suspected thermal expansion. Bled 7/10/2016 back+/- 3.5 bbls, hung tags on MV. FWHP=20/652/753, IA/OA=open, E-line in control of ***JOB CONTINUED FROM 9-JULY-16*** (SLB ELINE - MILL XN, WHIPSTOCK) SET TOP OF BAKER PACKER/WHIPSTOCK AT 14224' ELMD. ORIENTED 122 DEGREES LOHS. *2 RA TAGS INSTALLED 8 FEET BELOW TOP OF WHIPSTOCK* LOG CORRELATED TO SLB VISION SERVICE MEASURED DEPTH LOG DATED 11- MAR-2005. LRS PERFORMS MIT-T TO 2500 PSI. SEE LRS AWGRS. FINAL T/I/O = 0/700/700 7/10/2016 ***JOB COMPLETED. WELL SHUT-IN UPON DEPARTURE*** • • NK-38A Well History (Pre-Rig Sidetrack) ***Job continued from 7-9-16***, Load & test w/ E-line, (Pre CTD), MIT-T ***inconclusive***to 2500 psi, Pumped 40 bbls diesel down TBG for freeze protect, Whipstock set by E-line, Pumped 37 bbls diesel down TBG to reach test pressure, 1st 15 min TBG lost 24 psi, 2nd 15 min TBG gained 8 psi, suspected thermal expansion. Bled 7/10/2016 back +/- 3.5 bbls, hung tags on MV. FWHP=20/652/753, IA/OA=open, E-line in control of T/I/0=15/773/791, MIT-T ***PASSED***to 2500 psi, (Pre CTD), Pumped 3 bbls diesel down TBG to reach test pressure, 1st 15 min TBG lost 78 psi, 2nd 15 min TBG lost 31 psi for a total loss of 109 psi, Bled back +/-2.8 bbls, Tag hung on MV, DSO notified of well 7/13/2016 status, FWHP=240/775/793, SSV/WV/SV=closed, MV/IA/OA=open T/I/O = 17/760/770. Temp = SI. T FL (post MIT). AL LOTO © CV(120 psi). CLP =4520 psi. T FL© surface. 7/13/2016 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 14:00 T/I/0=250/800/800. Pre Nordic 2. Install TS#04 and X0#04. N/U Temp#16 and PT to 5000 psi. and replace both lateral valves. PT tree cap to 500 psi. ***Job Complete***See 7/14/2016 log. Final WHP's 250/800/800. T/I/0=250/800/800. Pre Nordic 2. PT tree against SSV to 300 psi (low) and 5000 psi 7/15/2016 (high). LTT SV to 3500 psi. See log for details. Final WHPs 250/800/800. ***Job T/I/0 = 250/840/770. Temp = SI. IA FL (Pre CTD). AL spool dropped. No wellhouse. IA FL @ 4400' (528' above sta#5, Dome, 235 bbls). 7/16/2016 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 04:30 T/I/0 = 250/840/720. Temp = SI. Eval Flow line VSM's (OPS call-in). Bring in gravel and compact under VSM's. Adjusted the VSM behind well house to firmly support flow line at the A location. Installed adjustable VSM's in the B and C locations. Moved VSM behind the valve at location D. ***Job incomplete, to be continued 7/21/16 ***. Final WHPs = 250/840/720. 7/20/2016 SV, WV,SSV= C. MV= 0. IA, OA= OTG. 1800 hrs T/I/0 = 0+/950/790. Temp = SI. Bleed WHPs to 0 psi (PRE CTD). AL and flowline disconnected. No well house, "Nordic platform" installed. IA FL @ 4365' (563' above sta #5 dome, 233 bbls. OA cemented to surface. Bled OAP to bleed trailer from 790 psi to 0 psi in < 1 min (gas). Bled IAP to production 950 psi to 530 psi in 1 hour. Monitored for 30 min IAP unchanged, OAP increased 180 psi. FWHPs = 0/530/180. **Job incomplete** 7/20/2016 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 23:30 T/I/0 = 0+/550/690. Temp = SI. IA FL (Fullbore request). No well house, AL spool dropped & FL is connected. IA FL @ 4147' ( 781' above Sta#5 Dome, 222 bbls). IAP increased 20 psi, OAP increased 510 psi overnight. 7/21/2016 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 10:30. T/I/0 = 0+/560/700. Temp = SI. Bleed WHPs to 0 psi (pre CTD). AL spool disconnected. OA cemented to surface. IA FL @ 4086' (842' above sta# 5, dome, 219 bbls). Started bleeding IAP from 560 psi to OT tank. 7/21/2016 WSR Continued on 7/22/16 T/I/0 = 250/840/720. Temp = SI. ***Job continued from 7/20/16 *** Eval Flow line VSM's (OPS call-in). Finished the gravel work behind the well. Made final adjustments on VSM's in locations A, B, C, & D. Job Complete. Final WHPs = 250/840/720. 7/21/2016 SV, WV,SSV= C. MV= 0. IA, OA= OTG. 1200 hrs T/I/0=0/565/700 Temp= S/I (CTD) Rigged up to IA/TBG. DHD bleeding IA/OA down to 0 7/21/2016 psi. ***Continued on 07-22-16 WSR*** • • NK-38A Well History (Pre-Rig Sidetrack) ***WSR Continued From 7/21/16*** T/I/O = 0+/70/700. Temp = SI. Bleed WHPs to 0 psi (pre CTD). AL spool disconnected. OA cemented to surface. IA FL @ 4086' (842' above sta#5, dome, 219 bbls). Continued to bleed IAP to OT tank from 70 psi to 20 psi in 4 hours. During IA bleed, IA FL inflowed 166' to 3920'. Bled OAP to OT tank from 700 psi to 0 psi in < 1 min (all gas). No monitor. FWHPs = 0+/20/0. LRS on site to load well and CMIT. 7/22/2016 LRS in control of valve positions. 01:30 ***Continued from 07-21-16 WSR*** MIT-T to 3000 psi (PASSED) CMIT-TxIA to 3000 psi (PASSED) Pumped 246 bbls of 50*diesel down IA to load. Pumped 3.25 bbls of 50*diesel down TBG to reach test pressure. 1st 15 min TBG lost 81 psi. 2nd 15 min TBG lost 31 psi for a total loss of 112 bbls in 30 min. Pumped 7.6 bbls of 50*diesel down IA to reach test psi 1st test 1st 15 min T/IAP lost 42/47 psi 2nd15 min T/IA lost 20/18 psi for a total loss of 62/65 psi in 30 min Bleed TxIA psi down bleed back — 15 bbls Bleed OAP down Wing shut 7/22/2016 swab shut ssv shut casing valves open to gauges Final Whp's = vac/11/8 T/I/O = 80/90/640. Temp = SI. WHPs (pre CTD). AL spool disconnected. OA cemented to surface. No well house. TP increased 80 psi, IAP increased 79 psi & OAP increased 632 psi since overnight. T & IA FL @ surface. Bled TP to BT from 80 psi to 0 psi in —3 min (0.7 Bbls). Bled IAP to BT from 90 psi to 0 psi in —3 min (0.3 Bbls). Bled OAP to BT from 640 psi to 0 psi in <1 min (gas). Monitor for 30 min. During monitor TP unchanged, IAP increased 10 psi, OAP increased 15 psi. Final WHPs = 0/10/15. 7/23/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. 09:15. T/I/O =400/500/660. Temp = SI. Bleed WHPs (Pre Rig). AL spool dropped. No wellhouse. Rig mats down in front of well. Bled TP from 400 psi to 0 psi in 15 min (0.75 bbls). TP increased 5 psi in 30 min. Bled IAP from 500 psi to 0 psi in 40 min (2 bbls). IAP increased 10 psi in 30 min. Bled OAP from 660 psi to 0 psi in 75 min (gas). OAP increased 270 psi in 30 min. FWHPs = 5/10/270. 7/31/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. NOVP. 1230 T/I/O = 70/160/610. Temp = SI. WHPs (Post bleed). AL spool &wellhouse removed. OA is cemented to surface. TP increased 65 psi, IAP increased 150 psi and the OAP increased 340 psi overnight. 8/1/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. 10:20. . • North America-ALASKA-BP Page 1 06- Operation Summary Report Common Wet Name:NK-38 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/1/2016 End Date:8/14/2016 X3-017X6-C:(3,352,134.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:NORDIC 2 Spud Date/Time:1/1/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292254000 Active datum:NK-38A @48.40usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 8/1/2016 04:00 - 06:00 2.00 MOB P PRE PJSM FOR PULLING OFF WELL D-20. DISCUSS USE OF STOP BLOCK,ESD,RADIO i CHECKS AND STOP COMMAND. PULL OFF WELL AND PULL TO SIDE OF PAD. 'CLEAN UP AROUND WELL. 06:00 - 07:30 1.50 MOB P PRE CONDUCT CREW CHANGE,ROUTE DRIVE -PJSM FOR MOVING RIG WITH ALL MEMBERS. DISCUSS MATTING,IMMOBILE OBJECTS,TRAFFIC CONDITIONS,WILDLIFE, 1 ;COMMUNICATIONS. 07:30 - 18:00 10.50 MOB P PRE MOVE RIG OFF OF D-PAD AND BEGIN MOVE I I TO DS-4 FOR STAGING I I-MOVE DOWN ACCESS ROAD AND THEN ONTO PLANNED COURSE WITH NO ISSUES 18:00 - 21:00 3.00 1 MOB P PRE CONTINUE MOVING RIG. 1 PULL OVER AT WIDE SPOT NEAR CENTRAL 1 GAS FACILITY FOR SHIFT CHANGE AND TO 1 LET TRAFFIC PASS. AFTER SHIFT CHANGE MOVE RIG TO PAD 10, I WAIT THERE FOR PARKER 272 MODS TO GET MOVING FROM MCC PAD. 21:00 - 00:00 3.00 MOB P PRE I WAIT AT PAD 10. 8/2/2016 00:00 - 02:30 l 2.50 MOB- P PRE I CONTINUE WAITING AT PAD 10 FOR PARKER MODULES TO START MOVING. 02:30 - 06:00 3.50 MOB P PRE I RECEIVE WORD TO START MOVING FROM 1 PAD 10,CONTINUE TOWARDS NK-38. 06:00 - 07:30 1.50 MOB P PRE MOVE FROM PAD 10 AND STAGE BY DS4 07:30 - 00:00 16.50 MOB P PRE STAGE RIG AT DS-4 WHILE RIG MATS ARE I I 1 BEING PLACED FOR THE REST OF THE MOVE. 8/3/2016 00:00 - 02:30 2.50 MOB P PRE CONTINUE TO WAIT ON MAT PLACEMENT 02:30 - 06:00 3.50 MOB P I PRE START MOVING IN TANDEM WITH PARKER 272 TOWARDS EAST DOCK STAGING AREA 06:00 - 00:00 18.00 MOB P Ij �FROM DRILLSITE 4 M._ PRE ARRIVE AT EAST DOCK STAGING AREAAND STAGE RIG PER MOVE COORDINATOR. CONTINUE WITH RIG OPS WHILE MATS ARE BEING MOVED AND LAID 8/4/2016 00:00 - 02:30 2.50 MOB P PRE 'CONTINUE TO STANDBY FOR RIG MAT 02:30 04:30 PLACEMENT I 2.00 MOB P PRE I START MOVING FROM EAST DOCK TO L5. 1 STAGE UP AT EXIT AND WAIT FOR MAT PLACEMENT 04:30 - 06:00 1.50 I MOB 1 P PRE WAIT FOR PARKER TO ARRIVE ON L5 AND GET MATS SHUFFLE TO NIAKUK. Printed 8/15/2016 10:20 58AM *AII depths reported in Drillers Depths* i North America-ALASKA-BP Page 2 Ott Operation Summary Report Common Well Name:NK-38 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/1/2016 End Date:8/14/2016 X3-017X6-C:(3,352,134.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:NORDIC 2 Spud Date/Time:1/1/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292254000 Active datum:NK-38A @48.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 18:00 12.00 MOB P PRE RIG PERSONNEL CONDUCTING RIG OPS AND PREPARING FOR LIFTING NEW REEL IN. -MATS BEING SHUFFLED -CONDUCT PRE-SPUD WITH DAY CREW -DHD OUT TO NK-38,TREE READINGS IN AM WERE T/I/O=120/250/230 PSI. BLED DOWN TO 0 PSI ON ALL,SLOWLY BUILDING UP l'AFTER CLOSING IN AT 1600 HRS. -DHD WILL BE COMING BACK OUT IN CONJUNCTION WITH RIG MOVE FOR FINAL i BLEED IN ORDER FOR RIG TO MOVE OVER i WELL 18:00 - 20:30 2.50 I MOB P PRE 1 MATS PLACED AND ROUTE DRIVE I PERFORMED. 20:30 - 21:30 1.00 MOB P PRE MOVE FROM L5 TO NIAKUK 21:30 - 22:30 1.00 MOB P PRE PJSM, DISCUSS PRCEDURE FOR PULLING OVER.PERFORMED LO/TO OF NK-17&18 FOR PULL OVER, 12 X 12 CHOCK BLOCK IN PLACE. ESD TESTED AND MANNED BY NORDIC SUPERINTENDENT ASSIGNED SPOTTER AND VERIFIED RADIO COMMUNICATION VERIFIED ALL VALVES CLOSED. PULLED OVER WELL WITH NO ISSUE. 22:30 - 00:00 1.50 MOB P PRE RIG ACCEPTED AT 22:30 PJSM FOR RU AND NIPPLE UP. STROKE SSV AND INSTALL FUSIBLE CAP. PERFORM LTT BETWEEN MASTER AND SWAB TO 3500#. NO VISUAL LEAKS. BEGIN NIPPLING DOWN BLIND FLANGE. AND NIPPLING UP BOPE. 8/5/2016 00:00 - 02:30 2.50 RIGU P PRE CONTINUE NIPPLE UP BOPE, AND SPACE OUT LUBRICATORS 02:30 - 06:00 3.50 RIGU P PRE !MAKE UP PACKOFF AND INSTALL ON WELL. !REEL ARRIVED. PJSM WITH ALL INVOLVED. RAISE REEL ON TO RIG. SECURE AND PREPARE TO PULL COIL ACROSS. -INSTALL AND PULL TEST GRAPPLE,ALL GOOD 06:00 - 07:00 1.00 RIGU P PRE CREW CHANGEOUT,CONDUCT THOROUGH WALKAROUND WITH CREWAND NIGHT WSL. TIGHT LOCATION,UNIQUE RIG-UP. 07:00 - 09:00 2.00 RIGU P PRE PULL COIL ACROSS,STAB INTO INJECTOR -STAND INJECTOR TO SIDE -AOGCC REP JEFF JONES WAIVED WITNESS TO BOP TEST AT 0700 HRS -TAKE ON WATER,DISPLACE COIL TO WATER 09:00 - 14:00 5.00 BOPSUR P PRE CONDUCT SHELL TEST OF BOP,GOOD TEST. WALK LINES,ALL GOOD. -TEST BOP EQUIPMENT TO 250 PSI LOW AND 14000 PSI HIGH PER PERMIT TO DRILL USING 2-3/8"AND 3-1/2"TEST JOINTS. TEST PER AOGCC,BOP,AND NORDIC TEST REQUIREMENTS -TEST ANNULAR TO 3500 PSI -FUNCTION DRILLERS REMOTE PANEL DURING TEST,FUNCTION CTS REMOTE PANEL FOR ACCUMULATOR DRAWDOWN TEST Printed 8/15/2016 10.20:58AM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 3fgob- Operation Summary Report Common Well Name:NK-38 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/1/2016 End Date:8/14/2016 X3-017X6-C:(3,352,134.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:NORDIC 2 Spud Date/Time:1/1/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292254000 Active datum:NK-38A©48.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (usft) 14:00 - 16:00 2.00 BOPSUR P PRE FLUID PACK REEL,CONDUCT PRESSURE TEST AGAINST INNER REEL IRON,INNER REEL VALVE,PRESSURE BULKHEAD,AND PACKOFFS TO 250 PSI LOW/4000 PSI HIGH 16:00 - 16:30 0.50 RIGU P PRE I VERIFY TORQUE ON TREE BOLTS 16:30 - 23:30 7.00 RIGU P PRE PUMP SLACK BACK ON COIL. CUT 175'OF COIL,FIND E-LINE PUMP SLACK BACK AGAIN CUT REMAINING 205'PIPE. -MAKE UP SLB COIL CONNECTOR. PULL TEST TO 38K -PERFORM PRETEST 4000#. NO LEAKS -PUMP SLACK FORWARD. MAKE UP BHI UQC -DISCUSS WITH DRILLER/TOURPUSHER/ TOOLPUSHER ABOUT DETAILED PROCEDURE TO TEST ALL REEL IRON AND BULKHEAD TO 6000# -WALKED JOB DOWN. VERIFIED LINE UP. I REPLACE 6K HFI WITH 10K. 23:30 - 00:00 0.50 RIGU P PRE -PERFORM 250#LOW PRESSURE TEST WITH TEST PUMP. 8/6/2016 00:00 - 02:30 i 2.50 RIGU P PRE CONTINUE TO PRESSURE UP FORA HIGH 'PRESSURE TEST OF REEL IRON/BULKHEAD -PRESSURE REACHED 6300#, WATCH PRESSURE AS CREW WALKED AND VISUALLY LEAK TIGHT. 02:30 - 03:20 0.83 RIGU P PRE BLEED EVERYTHING DOWN. RIG DOWN AND CLEAR FLOOR OF TEST EQUIPMENT. INSTALL FLOATS IN UQC PT LOW/HIGH 250# /3700# GOOD TEST 03:20 - 03:50 0.50 RIGU P PRE MAKE UP BHA#1 FOR BOTTOM KILL. STAB INJECTOR. TAKE CONTROL OF SSSV. PRESSURE UP TO —— 4000# 03:50 - 04:30 0.67 RIGU P PRE I CIRCULATE METHANOL SPEAR TO NOZZLE. MOVE 1%KCL TRUCK TO OPPOSITE SIDE OF RIG. OPEN WELL UP TO CLOSED CHOKE. WELL HAS 40 PSI ON IT;ATTEMPT TO BLEED OFF, CONTINUES TO SLOWLY BUILD. 04:30 - 09:45 5.25 RIGU P PRE RIH WITH NOZZLE BHA -STOP EVERY 1000'TO STRAP FLOW BACK TANK -GAS RETURNS BEGINNING AT 3000'. CONTINUED GASEOUS RETURNS FOR REMAINDER OF TRIP IN DOWN TO 13,000'. RETURNS BECOME MORE FLUID PACKED I FROM 13,000'TO BOTTOM. -LIGHTLY TAG WHIPSTOCK AT 14,240' UNCORRECTED DEPTH. 09:45 - 11:15 1.50 RIGU P PRE I CLOSE IN CHOKE,MAINTAIN 300 PSI OF BACK PRESSURE. -EMPTY FLOW BACK TANK OF RETURNS. SEND DIESELAND METHANOL OFF FOR RECYCLE. Printed 8/15/2016 10:20:58AM *AII depths reported in Drillers Depths` • • North America-ALASKA-BP Page 4 VEY Operation Summary Report Common Well Name:NK-38 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/1/2016 End Date:8/14/2016 X3-017X6-C:(3,352,134.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:NORDIC 2 Spud Date/Time:1/1/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292254000 Active datum:NK-38A©48.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:15 - 13:15 2.00 RIGU P PRE NOZZLE ON BOTTOM,DISPLACE WELL WITH REMAINDER OF 8.4 PPG KCL AND CHASE WITH 9.5 PPG FLOPRO MUD SYSTEM. -DISPLACE WELL AT 3.40 BPM,1875 PSI CIRC i PRESSURE WITH KCL BEING CIRCULATED BOUT -AS MUD COMES AROUND,CIRCULATION PRESSURE INCREASES TO 3375 PSI. FINAL CIRCULATION PRESSURE OF 3980 PSI AT 3.45 BPM. -BRING FLUID INSIDE FOR MUD ENGINEER TO VERIFY DENSITY -CONDUCT DRILL FOR HIGH GAS ALARM IN PITS-CREW REACTED IMMEDIATELY TO SIMULATE SHUTTING IN FROM BRINGING FLUID INSIDE. USED HANDHELD MONITORS TO CHECK SHAKER AREA,0 LEL. DISCUSS WITH CREW WHAT RESPONSES TO TAKE"IF" GAS WERE TO EVER GET TO SHAKER, EXPLAIN TO SUPPORT PERSONNEL HOW GAS CAN GET TRAPPED INTO UPPER PORTION OF LUBRICATOR DURING CIRC OUT AND WHAT MEASURES RIG CREW TAKES TO -MITIGATE. GIVE ALL CLEAR. -BRING FLUID IN. MW IN AT 9.57 PPG,MW OUT 9.47 PPG. -CONDUCT FLOW CHECK,ALL GOOD. GAINED.6 BBLS IN 70 SECONDS ONCE PUMPS WERE SHUT DOWN,DROPPED TO 0 RETURN RATE,WELL DEAD. 13:15 - 16:00 2.75 RIGU P PRE POH WITH NOZZLE BHA. -PJSM FOR FLOW CHECK AND SWAPPING OUT BHAS -PULL TO SURFACE,FLOW CHECK. DOWN ON PUMPS,GAINED.6 BBLS AND DROPPED TO 0 RETURNS,GOOD FLOW CHECK WITH NO FLOW. PULL BHA INTO BOP,POP OFF 16:00 - 17:00 1.00 STWHIP P WEXIT LAY DOWN NOZZLE BHA. MEG TEST E-LINE TO ENSURE ALL GOOD-CTS RP OF CIRCULATING AT 1.5 BPM ON INITIAL ENTRY COULD NOT BE MET ON LAST RUN SO TEAM WANTED TO ENSURE THAT CONNECTION WAS STILL GOOD IN UQC. MU BHA#2,3.80"MILLING BHA ON STRAIGHT MOTOR AND BHI SMART TOOLS. BOTH MILL GAUGE AT 3.80"GO,3.79"NO-GO. -STAB ON WITH INJECTOR. 17:00 19:50 2.83 STWHIP P WEXIT TEST QUICK TEST SUB WHILE MWD TOOLS ARE POWERED UP AND EDC IS OPENED. RIH WITH MILLING BHA -9.55 PPG IN /9.48 PPG OUT -2.07 BPM IN/2.58 BPM OUT RIH AT 100 FPM -IA/OA=49#/424# SSSV=4150# 19:50 - 20:30 0.67 STWHIP P WEXIT LOG TIE IN FROM 13800'-13859'WITH-12.5' CORRECTION Printed 8/15/2016 10:20:58AM `AII depths reported in Drillers Depths* • • • North America-ALASKA-BP Page Serer Operation Summary Report Common Wet Name:NK-38 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/1/2016 End Date:8/14/2016 X3-017X6-C:(3,352,134.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:NORDIC 2 Spud Date/Time:1/1/1995 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292254000 Active datum:NK-38A @48.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) /�� 20:30 - 20:50 0.33 STWHIP P WEXIT RIH TO WHIPSTOCK T� TAG AT 14229' Nti PU AND CLOSE EDC. ESTABLISH h PARAMETERS FREE SPIN=3380 PSI AT 2.74 BPM RATE IN=2.74 BPM RATE OUT=2.74 BPM MW IN=9.59 PPG MW OUT=9.49 PPG ECD =10.84 PPG IAP=164 PSI OAP=435 PSI PVT=269 BBLS CREEP IN AND INITIATE WINDOW AT 14227.07' 20:50 - 00:00 3.17 STWHIP P WEXIT FREE SPIN=3380 PSI AT 2.74 BPM RATE IN=2.74 BPM RATE OUT=2.74 BPM MW IN=9.59 PPG MW OUT=9.49 PPG ECD =10.84 PPG ROP=1 FPH WOB=3.5 K CIRC PSI=3600 PSI IAP=44 PSI OAP=445 PSI PVT=270 BBLS 8/7/2016 00:00 - 02:00 2.00 STWHIP P WEXIT MILL WINDOW FREE SPIN=3380 PSI AT 2.74 BPM RATE IN=2.74 BPM RATE OUT=2.74 BPM MW IN=9.58 PPG MW OUT=9.48 PPG ECD =10.84 PPG ROP=1 FPH WOB=3.5-4.0K CIRC PSI= 3625 PSI IAP=82 PSI OAP=448 PSI PVT=269 BBLS TAKING MORE WEIGHT AND DRILLING OFF SLOWER. 02:00 - 04:00 2.00 STWHIP P WEXIT MILL WINDOW FREE SPIN=3380 PSI AT 2.74 BPM RATE IN=2.74 BPM RATE OUT=2.74 BPM MW IN=9.58 PPG MW OUT=9.48 PPG ECD =10.86 PPG ROP=0.7 FPH WOB=3.5-4.0K CIRC PSI= 3625 PSI IAP=153 PSI OAP=455 PSI PVT=268 BBLS 04:00 - 08:30 4.50 STWHIP P WEXIT MILL WINDOW WITH INDICATIONS THAT DIAMOND MILL IS OUT BY OBSERVING PRESSURE DROP. -CONTINUE TO MILL PER BOT REP TO PLACE STRING REAMER ACROSS WINDOW -MILL WITH 200-400 PSI DIFFERENTIAL WEIGHT -LOSING COMMUNICATIONS INTERMITTENTLY DURING MILLING 08:30 - 11:00 2.50 STWHIP P WEXIT MILL INTO OPEN HOLE FOR RAT HOLE TO 14,246'- -PUMP LO-VIS AND HI-VIS SWEEP COMBINATION TO HELP MOVE CUTTINGS, METAL OUT OF WELL -PUMP SAMPLE UP FROM 14,246' -RETURN OF SWEEP INCREASED VOLUME BY 20%,NO NOTICEABLE CHANGE IN RETURN STRUCTURE -STILL LOSING COMMUNICATIONS INTERMITTENTLY,CANNOT CORRELATE BHI DEPTH WITH CTDS DEPTH(DUPLICITY/ VERIFICATION) -MW IN 9.56 PPG,MW OUT 9.48 PPG,ECD AT 10.74 PPG Printed 8/15/2016 10:20:58AM `AII depths reported in Drillers Depths* ` L ES"IVE&= BAKER KB. ELEV= 59.5' * ,• I 13990'. REFELF9/= 48.4' 2 l• 2211' I—4 112'FES SSSV W BF. ELEV= 22.03' 20'COPD.94# — 109' ,• ELLSTAFZ D=3813° KOP= 9163' H-40,D= 19.124" � Max Angle= 95'@ 15265 �� 37: -95/8"HE5 C ?uBJTHR Datum MD= 14196' • ' 3810' --H9-5/8"FES ECP,D=8, 1" Datum TVD= 9850'SS r j 1 9 5/8'CSG,47#,L-80 HYD 563 XO — 3749' j 4000'-4540' -{1517#ARCTIC SET CEMENT(06/07/05) TO L-80 BTC • ST MD TVD DEV GAS TYLPE FT MVLVANDRELLATCH PORT DATE 9-5/8"BOWBV CSG PATCH,47#, H 3835' , L- }BTG D=8.681' 6 3001 2969 22 MAG MY RK 0 08/30/09 5 4928 4505 41 MC DOME RK 16 07/05/16 13-3/8"CSG,68#,NT80 NSCG — 4544' 4 6811 5512 65 MMD DMY RK 0 08/24/09 D=12.415' 3 9156 6507 64 KBG-2 SO BK 24 07/05/16 2 10787 7498 43 KBG-2 'DM' BK 0 01/26/16 1 12126 8507 37 KBG-2 DMY BK ' 0 08/24/09 'STA N2=EXT PACKING TOP OF 7"LNR 9003' 1 Pi Minimum ID = 3.80" 13368' 9003' j—9-5/8"X r BKR ZXP LTPw/BKR FLEXLOCK LMR HGR,D=6.330" JI 4-112" MILLED HES XN NIPPLE W-IPSTOCK(02/11/05) —I 9163' 13128' I—4-1/7 NUM SENSOR,D=3.864" MLLOtJT V1InIDOW(NK-38A)9163'-9179' iiik 13163' —4-1/2"FESXNP,ID=3.813" D 13193' _ .T X 4-1/7 S-3 FKR,D=3.875'_ 4-12"TBG, 12.6#,13CR-80 VAM TOP, — 13258' c: .0152 bpf,D ;�=3.958' , 1322T —4-1/2"FES X MP,D=3.813" ik 4-1/2"TBG STUB(08/16/09) I— 13265' 13273' 1—7"X 4-12"LlNQ E OV ERSHOT EZSV(02/10/05) H 9206' 11` 13303' —4-12"FES X NP,D=3.813' PERFORATION SUMNARY , 13324' —7'X 4-12^BKR S-3 F (R,D=3.875" REF LOG MIM)GR ON 01/03/05 i' di AT TOP FBF:90° 15504' :: ` 13348' —4-1/2"FES X NP,D=3.813" Pate:Refer to Roduction DB for historical pert data .v•-•„-. ` 13368' —4-12”FES XN NP MLLED TO 3.80" • SIZE SPF IMERVAL Opn/Sgz DATE iii• 2-12" 6 15504-15743 0 03/13/05 �:•♦•♦•♦•♦•♦" (07/09/16) ,....4., 2-12' 6 15793-16396 0 03/13/05 ► ..• •••••••• 13372 —r X 5'BKR"I-PET ZXP LIP, ID=5.00' 2-12' 6 16446-16556 0 03/13105 6 16576-16676 0 03/13/05 /•�•�•�•�•�•�•• 2-12' ' �r,, 13381' 4-12'WLEG,D=3.956" i•••�•�•�•�•• ...••:4.,...A., \ 13368' —ELM)TT LOGGED ON 8/30/09 13394' —7^X 5'DG FLEX-LOCK 9-5/8"CSG,47#,NT-80S NCC D=8.681" I-- 16060' HGR,D=4.430' 412'TBG, 12.6#,L-80 I3T-M,.0152 bpf,Ft=3.958' — 13381' 13404' I-5"X4-12"XO,D=3.940' 7"LNR 26#,L-80,BTC-M._0383 bpi,D=6.276" H 13534' III - Rl1 16678' 4-112'FASORLL G 45 KB F1<2 WFiPSTOCK(07/10/16) — 14227' RJSFED TO BTM ♦4.4 (0727/09) �r*,:•41 16678' —FBTD I 4-12"LM 11.6#,L-80 LTC BRD,.0155 bpf,0=4.000" 16763' vtioi DATE 1 REV BY COMMENTS - DATE FEV BY COMM3JTS MAKU(LJNfT 03/01/95 OIIG COMPLETION,(POOL 7) 02/18/11 MAC ADDED SSSV SAFETY NOTE WELL: M(-38A . 03/16/05 PEES 1.0438A SIDETRACK"A" 0625/11 7/PJC ELM)TT LOGGED(8/30/09) FERMI No:2042410 08/26109 D16 MVO 01/29/16 JLS/JMD GLV GO(01/28/16) AR Na: 50-029-22540-01 08/27/09 TLI-I DRLG HO CORRECTIONS 07/07/16 JP.43/JMD GLV CIO(07/05/16) SEC 36,T12P1 R15E 1410'FSL&854'FEL 09/01/09 MWJM) CRLG DRAFT CORRECTIONS 07/12/16 MFYJMD M_L XN PF,SET WS(07/09-10/16) 09/11/09- TU-I GLV COF NS � I _ BP Exploration(Alaska) OF T� • • g \ 1//7; �sA THE STATE Alaska Oil and Gas of Conservation Commission =_= LASKA 333 West Seventh Avenue Z--— � Anchorage, Alaska 99501-3572 GOVERNOR BILL WALKER g Main: 907.279.1433 "A'ALAS1°' Fax: 907.276.7542 www.aogcc.alaska.gov Sean McLaughlin Drilling Supervisor SCANNED SEP '8 2016 BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Raven Oil Pool, PBU NK-38A Permit to Drill Number: 204-241 Sundry Number: 316-263 Dear Mr. McLaughlin: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /a44c1— Cathy P. oerster Chair DATED this Z4ty of May, 2016. RBDMS LL MAY 3 1 2016 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMON APPLICATION FOR SUNDRY APPRO S 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations o Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend 0 Perforate ❑ Other Stimulate 0 Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill p ' Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 204-241 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development p 6. API Number: 50-029-22540-01-00 . 99519-6612 Stratigraphic ❑ Service 0 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No p PBU NK-38A • 1ErEIVED 9. Property Designation(Lease Number): 10. Field/Pools: ADL 034630 • PRUDHOE BAY,RAVEN OIL • MAY 0 9 2016 11. PRESENT WELL CONDITION SUMMARY va sI I/ '�I b Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 16765. 9923 - 16678 9915 3475 None 16678' Casing Length Size MD TVD Burst Collapse Structural Conductor 79 20" 30-109 29-108 1530 520 Surface 4504 13-3/8" 29-4533 29-4202 5020 2260 Intermediate 9137 9-5/8" 26-9163 26-6510 6870 4760 Liner 4531 7" 9003-13534 6441 -9598 7240 5410 Liner 3391 4-1/2" 13372-16763 9482-9923 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 15504-16676 9907-9915 4-1/2",12.6# 13Cr80/L-80 13381 Packers and SSSV Type: 4-1/2"Wellstar SSSV Packers and SSSV MD(ft)and TVD(ft): 2211/2209 4-1/2"Baker S-3 Packer 13196/9354 4-1/2"Baker S-3 Packer 13324/9447 12.Attachments: Proposal Summary p Wellbore Schematic p 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch p Exploratory 0 Stratigraphic ❑ Development 2 Service ❑ 14.Estimated Date for Commencing Operations: June 1,2016 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended p • 16.Verbal Approval: Date: GAS ❑ WAG 0 GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Ciolkosz,Ryan R be deviated from without prior written approval. Email Ryan.Ciolkosz@bp.com Printed Name Sean McLaughlin Title Engineering Supervisor /// Signature L7 N.tL` /Phone +1 907 564 4387 Date I( 6 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: /f N'/* Mechanical ZL1Z3 Plug Integrity ❑ BOP Test N Mechanical Integrity Test ❑ Location Clearance ❑ Other: 130p Tf5t.p ✓tS5v✓.6 1-o 4DUDp5'`' ;17-1n ti 1 4 V" pre-I/!vr1rr ft,5t I-0 2`S' a po,--q SGL rorfGl t�" ,�^ /�GfCrn ettc p II1 p 14 eekvctn pp Post Initial Injection MIT Req'd? Yes 0 No L7 J aZ D AA-C 75. 1I Z (t- Spacing Exception Required? Yes❑ No Qf Subsequent Form Required: it, — Lf1.9. APPROVED BYTHE Approved by: "I9 COMMISSIONER COMMISSION Date: ,.c•L,./!/ ale1470-1.- 5/23/6L 5� ORIGINAL RBDMS - MAY 3 1 2016 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. /)): Attachments in Duplicate • • To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz bD CTD Engineer Date: May 3, 2016 Re: NK-38B Sundry Approval Sundry approval is requested to plug the NK-38A wellbore as part of the drilling and completion of the proposed NK-38B CTD sidetrack. History and current status: • 1995: Original Completion • 2005: Rotary sidetrack, NK-38A • 2009: RWO to mitigate IAxOA communication (new upper 9-5/8" casing). OA cemented to surface NK-38A does not have any existing value left. Proposed plan: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around August 15st, 2016. E-line unit will attempt to drift and set CTD whipstock. Nordic 2 will mill a 3.80" window in the 4-1/2" liner and drill a Niakuk Ivishak well to -17,265' MD. The lateral will be completed with a 3-1/2" x 2-7/8" 13Cr-80 liner which will be cemented and perforated. This Sundry covers plugging the existing NK-38A perforations via the NK-38B liner cement job or liner top packer set post-rig (alternate plug placement per 20 AAC 25.112(i)) and via posi-set plug. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. � SCJ^�4' (rad) �i '� _ ` 61121 11-4 Ifr41-"- /41 rileA btuve P I' 7-17 114 vv-e a (foo, ff; i fm) Ved re fr ry,) ter r, d4a� ihe /'o 37/146 • • • CTD Drill and Complete NK-38B program: Rig Start Date: August 15st, 2016 Pre-Rig Work(scheduled to begin June 1st, 2016) Pull LGLV. Set DGLV & Circulation Valve. Pull Same & Set LGLV. Set 1. S CIBP 2. F A/SL: Displace IA to diesel. Freeze Protect Tubing. Test CIBP 3. E Mill XN Nipple. Set Whipstock 1,1 4. V Pre CTD Tree Work �ry Rig Work: aoP tz5-f da 4 oa" p s-- 1. MIRU and test BOPE.. Maximum expected surface pressure with gas (0.10 psi/ft)to surface is 3,475 psi. 2. Mill 3.80" window plus 10' of rathole. Swap the well to 9.5 ppg PowerPro. 3. PU drilling BHA with GR/Resistivity 4. Drill 4.25" hole to TD at—17,265' MD 5. Run 3-1/2" x 2-7/8" 13Cr-80 liner. 6. Pump primary cement bringing TQC to TOL, 40 bbls of 15.8 ppg liner cmt planned* 7. Test liner lap to 2,400 psi. 8. Perforate liner per asset instructions C i,✓ 9. Freeze protect well, RDMO PTD Post Rig: 1. V: Tree work as necessary. 2. S: Drift. LTP if necessary.* 3. F: Pressure test Liner top packer 4. T: ASRC flow back *Approved alternate plug placement per 20 AAC 25.112(i) Ryan Ciolkosz CTD Engineer 564-5977 CC: Well File Joe Lastufka IFS= CJ I /W ILO..r/LL.L CKCJ H0,14Y li4(vtJJ W. -II4 WELLHEAD= FMC 14 s CHROME TBG&NPPLES"'"WELL ANGLE>70"@ ACTUATOR= BAKER VI eawr KB E3EV= 48.20' .; 2211' 1-~4-1/2"HES SSSV WELLSTAR,D=3.813" BF.ELEV= 20' KOP= 9163' 4 Max Angle= 95 @ 15265 jf 3788' -j9-5/8"HES CuENTH2 Datum M • D= 14196' •, Dottxn TVD' 9850'SS 3810' -+9-5/8"HES ECP,D=8.681" 9-5/8"CSG,47#,L-80 HY D 563 XO - 3778' { TO L-80 BTC 1 14000'-4540' H 15/7#ARCTIC SET CREW(06/07/05) / 9-5/8'BOWBd C=St PATCH,47#, H 3835" GAS LFT MANDRELS L-80 BTC,D=8.681" ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3001 2969 22 M?AMC3 DMY RK 0 08/30/09 13-3/8"CSG,68#,NTT80 NSCC - 4544' ' I y 5 4928 4505 41 DOME RK 16 01/28/16 D=12.415" 4 6811 5512 65 MM3 DMY RK 0 08/24/09 3 9156 6507 64 KBG-2 SO BK 24 01/28/16 2 10787 7498 43 KBG-2 'DMY BK 0 01/26/16 1 12126 8507 37 KBG-2 DMY BK 0 08/24/09 "STA#2=EXTENDED PACKING TCP OF 7"LNR -1 9003' 900Minimum ID = 3.725" 13368' 3" 1--9-5/8"X 7"BKR ZXP LW w/BKR FLEXLOCK LNR HGR,D=6.330" 4-1/2" HES XN NIPPLE 13128' -4-1/2"NDPG SENSOR,D=3.864" WHPSTCX3((02/11/05) H 9163' lit 13163' H4-1/2"HES XNP,D=3.813" MLLOUT WINDOW(NK 38A)9163'-9179' v. !:.,,,,, ili 13193' I-r X 4-1/2"S-3 FKR D=3.875" 4-1/2-113G,126#,13CR 80 VAM TOP, -{ 13258' 1 .0152 bpf,D=3.958' C: , 13227' -14-1/2"HES X NP,ID=3.813" 4-1/2'7BG STUB(08/16/09) -1 13265' giigglg:•<* 11E30111 r X 4-1/1"UNDUE OVERSHOT I 1 Ir • ,,.e \` 13303' -{4-1/PES FX NF,ID=3.813" PERFORATION SLIIMtARY —r FIEF LOG:MWD GR ON 01/03/05 , 13324' H7"X 4-1/2"BKR S-3 PKR,D=3.875" ANGLE AT TOP PEW:90°c 15504' �; MEM - -14 112"FSS X Nom,K3=3.813" Note:Refer to Production DB for historical pert data C'...! �I�u� SIZE SPF M732VAL OpnlSgz DATE -;>A•41.;.ism. ` 13368' -14-1/2-FES XN NW?D=3.725" 44:•:•:44. 2-112" 6 15504-15743 0 03/13/05 2-1/2" 6 15793-16396 0 03/13/05 �'••••• % •••••••••••••••44 13372' I-7"X 5'BKR"hf2D"ZXP LTP D=5.00" 2-1/7 6 16446-16556 0 03/13/05 ►•iiiiiii� 2-1/7 6 16576-16676 0 03/13/05 ►i i••••••• i i••••0 m 13381' -14- 1/2"wLEG,D=3.958" iiii3Oii.� 13368' H ELME/TT LOGGED ON 8/30/09 13394' -17"X 5"DG FLEX-LOO( HGR,D=4.430" 9-5/8"CSG,47#,NT-80S NSCC,13=8.681" I- 16060' , 13404' J-5"x 4-1/2'XO,13=3.940" -16678' 4-1/2"FASDRLL PLUG 4-112"TBG, 12.6#,L-80 BT--M,.0152 bpf,D=3.958" H 13381' , PUSH®TO BTM (07/27/09) 7"LNR,264/,L-80,BTC-M,.0383 bpf,D=6.276' -1 13534' 1 16678' FBTD wig% '1114,411114 14-1/2"LNR,11.6#,L-80 LTC 8RD,.0155 bpf,D=4.000" 16763' �� .4.4 —1."�� DATE REV BY COt4EVTS DATE REV BY CX)MuEJFS NIA KUK UNIT 03/01/95 OIG COMPLETION,(POOL 7) 02/18/11 MB/AD ADDED SSSV SAI-t_IY NOTE WELL: N(-38A 03/16/05 N9ES N(-38_A SIDETRACK"A" 06/25/11 PJELM) FU?/ C IT LOGGED(8/30/09) PERMIT No:"1042410 08/26/09 Dib RWO 01/29/16 JLS/Af) GLV C/O(01/28/16) API Nb: 50-029-22540-01 08/27/09 TLH DRLG FRO CORRECTIONS SEC 36,T12N,R15E 1410'ESL&854'FEL - 09/01/09 MNYJMD DRLG DRAFT CORRECTIONS 09/11/09 TLH GLV CORRECTIONS BP Exploration(Alaska) TREE= CNV I 1\V 1 Cy,IICLL RC4(l/IRCJ N JJJ Y. 4-114 WELLHEAD= FMC NK -98B P roposed CHROME TBG BMPPLES***WELLANGLE>70*@ ACTUATOR_ BAKER 1 114CM KB E1EV 48.20' BF ELEV= 20' r 2211' -I4-1/2"HES SSSV YVELLSTAR,D=3.813" KOP 9163' 4 I ^. Max Angle= 95°©15265' �. •� 3788' -19-5/8"HES CEMENTER Datum -=.-MD14196' Datum TVD 9850 SS I i3810' -9-5/8"HES ECP,D=8.681" 9-5/8"CSG,47#,L-80 HY D 563 XO H 3778' TO L-80 BTC W ! 4000'-4540' H15/7#ARCTIC SET CEMENT(06/07/05) 9-5/8"BOWBN CSG PATCH,47#, -j 3835' •• GAS LFT MANDRELS L-80 BTC,D=8.681" • ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3001 2969 22 MMG DMY RK 0 08/30/09 13-3/8"CSG,68#,NT80 NSCC -i 4544' I 'yl 5 4928 4505 41 MMG DOME RK 16 01/28/16 D=12-415" 4 6811 5512 65 MMG DMY RK 0 08/24/09 3 9156 6507 64 KBG-2 SO BK 24 01/28/16 2 10787 7498 43 KBG-2 *DMI' BK 0 01/26/16 1 12126 8507 37 KBG-2 DMY BK 0 08/24/09 *STA#2=EXTENDED PACKING TOP OF 7"LNR --I 9003' Minimum ID =3.725" @ 13368' 9003' -9 5/8^X 7"BKRZXPLIP wlBKRFLEXLOCK 4-1/2" HES XN NIPPLE LNR HGR D=6.330^ _ 13128' -14-1/2"NDPG SENSOR 13=3.864" 9-5/8"CSG,47#,NT-80S NSCC,D=8.681" -1 9163' i MLLOUT WINDOW(NK-38A)9163'-9179' I 13163' -{4 1/2"HES X NP D=3.813" X ® 13193' H 7"X 4-1/7 S-3 PKR,13=3.875" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, --113258' t 1\.......,........... .0152 bpf,13=3.958" 3.813" 14-1/2"TBG STUB(08/16/09) H 13265' l 1322T H4-1/2"FES X NP,13= 13273' -I 7"X 4-112"UNIQUE OVERSHOT Q5��55 _L t 13303' -14-1/2"HES X NP,D=3.813" 13372' H 7"X 5"BKR"l-I Y ZXP LIP, D=5.00" 13324' 7"X 4-1/2"BKR S-3 PKR 13=3.875" 13394' 7"X 5"DG FLEX-LOCK I I 13348' H4-1/2"FESX NP,13=3.813" �FIGR D=4.430^ 13368' H4-1/2"HES XN NP,:C=_ =M illouttn 3.80"ID 13404' -15"x 4-1/2"XO,13=3.940" 13381' -{4-1/2"WLEG,D=3.958" 4-1/2"TBG,12.6#,L-80 BT-M,.0152 bpf,ID=3.958" H 13381' 13368' H ELMD TT LOGGED ON 8/30/09 7"LNR,26#,L-80,BTC-M,.0383 bpf,D=6.276" H 13534' , , .70"BKR DEPLOY SLV,ID = 3.00"@ 13,900 MD ,.dmY 312"XN}Dph,ID = 2.813"@ 13,910 MD 3-1/2"9 3'# STL 13CR-80 3-1/2"x 2-7/8"X0 @ -14190'M D� 4-1/2"M onobore wh4Dst-ock @ 14220'M D PERFORATION SUMMARY 4-1/2"C]BP @ -14260'M D "-111/ 1 RA TAG @ TBD REF LOG_MWD GR ON 01/03.05 ANGLE A T TOP PERF:90.@ 15509' x°t":R°rer to P,odudun O6 tarbimmal port aaa 2-7/8"6 5# STL 13CR-80 @ 17,265' SPE SPE MFRVAL Opn/Sq, DATE 2..12• 6 15504 15743 0 03/13/05 -- 2.12• 6 15/93-16396 0 03/13/05 ^'16678' -4-1/2"FASDRLL PLUG 2 Irr 6 16996-16559 0 03/13/05 -•-- z-trz• 6 105/6 16670 0 03/13/05 •-•-•-•- PUSFKED TO BTM 4-1/2"LNR,11.6#,L-80 LTC 8RD,.0155 bpf,D=4.000" H 16763' j��j-.4 16678' -{AHD (07/27/09) DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNT 03/01/95 ORIG COMPLETION,(POOL 7) 02/18/11 MB/JMD ADDED SSSV SAFETY NOTE WILL: N038A 03/16/05 N9E5 NK 38A SIDETRACK"A" 06/25/11 7/PJC ELM?IT LOGGED(8/30/09) PERMIT No:"2042410 08/26/09 D16 RWO 01/29/16 JLS/JMD GLV C/O(01/28/16) AR No: 50-029-22540-01 08/27/09 TLH DRLG HO CORRECTIONS SEC 36,T12N,R15E,1410'FSL&854'FEL 09/01/09 NTIMMD DRLG DRAFT CORRECTIONS 09/11/09 TLH GLV CORRECTIONS BP Exploration(Alaska) • •• i 1 tor I 1 N. 1 w 1 1 1 E0 5 1 1 1I 1 I UZ U I yea. 1 0: I • 1 I ���� I i2-!-! 1 1 1 1 1-E 1 1 I, dad 1 1 1 I i' 1 I 4 1 1 r � Qco r .i aR fi 1 a To O V ' I II •• .. O J I .. I Q 4101 IS. I I 1 .. I —L2 Ca !J I . f 11111, 1 Z 1 1 _O I I g-®I U I . I a U U-I I aull Ja15n8 5e'J 1 1; s cls rc" u l I h• r \ ci I :I rc 1 \ f H a 1 J f•M- tI 1 g �� \ aim0 I W : j.n g 1 U r �' IL x 0 I LLI .. '. V U U iii z U `:i, 1 U. 2 'C' •* • U o m I N H 3 _ = 0 f1 " of 1 Z, I I �. . ;• E ry \a 0 0 IIII d E. F- a 2 / ..., ) : ;1 ? 4 I 3 ..- : ' - 0 I o -vi } I ` I 0 z - I / Z Q I I '•i N o 1 U S nm F P a £ n 1 =g i .11o� U E 1 U 1 , • - r m E 14 u s r. int g I I .1 I a .. I. I ! Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist tl . in the upper left corner of Form 10-403 is checked. If the "Abandon" or „ "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then i it on both copies of the Form 10-403 (AOGCC's and operator's copies). v Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the Stat Tech History tab in RBDMS for the"Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query in RBDMS to ensure that all of the Plug for Redrill wells have been Geologist handled properly. At this same time, they will also review the list of suspended wells for accuracy. • • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 July 6, 2011 AIWA' J Mr. Tom Maunder Alaska Oil and Gas Conservation Commission c o 1 - d` 333 West 7 Avenue j A Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA Niakuk Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA Niakuk that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Mehreen Vazir, at 659 -5102. Sincerely, Gerald Murphy BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Niakuk Date: 05/15/11 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal NK -01A 1780280 500292015601 P&A 3/9/91 NA NA NA NA NA NK -02A 1780790 500292018001 P&A 3/13/91 NA NA NA NA NA NK -03 1780940 500292035000 PM 4/14/80 NA NA NA NA NA NK-04 1842000 500292121700 PM 4/14/96 NA NA NA NA NA NK -05 1850270 500292129000 PM 4/15/98 NA NA NA NA NA NK-06 1852760 500292148800 PM 4/15/98 NA NA NA NA NA NK -07A 2010830 500292241001 0.2 NA 0.2 NA 0.9 4/30/2011 NK-08A 2010290 500292249101 0.2 NA 0.2 NA 0.9 4/30/2011 NK-09 1941400 500292251800 2.1 NA 2.1 NA 17.0 4/30/2011 NK -10 1931840 500292242500 1.5 NA 1.5 NA 11.9 4/30/2011 NK -11A 2020020 500292278901 1.5 NA 1.5 NA 11.9 4/30/2011 NK -12C 2030550 600292241403 1.8 NA 1.8 NA 31.0 4/30/2011 NK -13 1981340 500292289300 2.3 NA 2.3 NA 22.1 5/4/2011 NK -14A 2050310 500292288801 1.8 NA 1.8 NA 17.0 5/4/2011 NK -15 1970320 500292274500 1.8 NA 1.8 NA 18.7 5/4/2011 NK -16 1940220 500292244700 2.5 NA 2.5 NA 20.4 5/4/2011 NK -17 1981850 500292270900 3 NA 3 NA 20.4 5/4/2011 NK -18 1931770 500292242100 2 NA 2 NA 17.0 5/6/2011 NK -19A 2010700 500292250701 1.8 NA 1.8 NA 15.3 5/8/2011 NK -20A 2050400 500292242901 2.1 NA 2.1 NA 13.6 5/9/2011 NK -21 1940880 500292248700 2 NA 2 NA 22.1 5/15/2011 NK -22A 2012280 500292240201 1.5 NA 1.5 NA 11.9 5/11/2011 NK -23 1940350 500292245500 3.6 NA 3.6 NA 20.4 5/10/2011 NK -25 1970880 500292278000 2.5 NA 2.5 NA 15.3 5/11/2011 NK -28 1940050 500292244000 2.9 NA 2.9 NA 17.0 5/11/2011 NK -27 1950210 500292254700 2.3 NA 2.3 NA 13.6 4/30/2011 NK -28 1980930 500292267800 Sealed Conductor NA Sealed Conductor NA NA NA NK -29 1981900 500292272400 1.7 NA 1.7 NA 10.2 4/30/2011 N K-38A 2042410 500292254001 3.1 NA 3.1 NA 13.6 5/8/2011 G / r NK -41A 1971580 500292277801 9.1 NA 9.1 NA 54.0 5/9/2011 NK-42 1941080 500292249900 2 NA 2 NA 13.6 5/9/2011 NK-43 2010010 500292299800 1 NA 1 NA 5.1 5/9/2011 NK-61A 2060350 500292289301 14 NA 14 NA 110.5 5/15/2011 NK-82A 2030470 500292285201 1.3 NA 1.3 NA 13.6 5/4/2011 NK.85A 2050830 _ 500292288901 1 NA 1 NA 8.5 5/8/2011 • • BP closes site over loss in Slope rent dispute HEALD POINT: Oengas fight oil giant over rent for use of their land. By ELIZABETH BLUEMINK ebluemink@adn.com Published: January 4th, 2011 10:09 PM @ CD ‘ (DO Last Modified: January 4th, 2011 10:09 PM N � \ D()\--0'\ BP shut down a small portion of the Prudhoe Bay oil field last week after a judge ruled that federal regulators failed for ears to get rov from the Inupiat Eskimo family that owns the land. JAN .1 a_�p Zu CO IN■\ \`-\L WAIN of MO Rhea t?sMrq Muir &yr tor, , ..r r Photo courtesy of BP Exploration (Alaska) Inc. Heald Point drill pad at Prudhoe Bay has been used to access oil from several oil pools, including Raven. The BIA told BP to suspend Raven production in late December due to a court ruling. Read more: http: / /www.adn.com /2011 /01 /04/v- gallery /1631936/bp- closes- site - over - loss- in- rent.html #ixzzl AB7r01r1 • • The shutdown affects less than 1 percent of production from the nation's largest oil field, but so far it's the most visible consequence of a significant legal victory for the Native family, which has battled lawyers for the federal Bureau of Indian Affairs and BP in federal court over the oil production from its land. Federal claims court judge Nancy Firestone ruled this fall that the Oenga family is owed millions in unpaid rent because the BIA improperly allowed BP to tap three offshore oil deposits from the family's allotment on the northern edge of the vast Prudhoe oil field. The BIA approved BP's expanded use of the allotment without the family's consent, in violation of the family's contract with BP, Firestone said in her 168 - page ruling on Nov. 22. A week ago, the BIA told BP to shut down production from Prudhoe's Raven unit, the only one of the three disputed offshore deposits that BP was still accessing from the allotment. BP shut down Raven, which produced about 25,000 barrels of oil in November, on Friday. BP is still legally tapping the Niakuk field from the allotment. The battle over unpaid rent and unauthorized land use involves a nondescript finger of land called Heald Point that extends into the Beaufort Sea. The Oenga family acquired its 40 -acre allotment at Heald Point decades ago for subsistence hunting. But in 1989, the family patriarch, Andrew Oenga, signed a contract with BP allowing the oil giant to use Heald Point as a right of way. Years later, believing that BP was giving the family annual rent payments much lower than the land's true value, eight of Oenga's heirs -- including two children, his grandchildren and great - grandchildren -- sued the BIA in 2005. The family said it had to go to court because it was unable to persuade the agency, which is in charge of collecting the family's rent from BP, to take action on its behalf. In an eight -day Lower 48 trial last July, the agency and the oil giant defended themselves against the Oengas' claims. BP argued in court filings that no additional money was owed to the family. The BIA argued that the family's claims for unpaid rent were exorbitant. • The judge ruled for the family, saying the BIA owes it roughly $5 million for the unauthorized use of the land, but she also said that BP is paying too little for the land it is authorized to use. The judge is still taking briefings on the exact amount owed but it will be far below the $200 million the Oengas originally sought. BP Alaska spokesman Steve Rinehart said Tuesday the company is evaluating its best path forward on a potential appeal. He emphasized that Raven represented a fraction of Prudhoe's output. BIA's acting director in Alaska did not return a call for comment on Tuesday. In a written statement late week, Oenga family member Tony Delia said the family is willing to end the matter. "Earlier this month we made BP a fair offer -- pay what is owed and we will renegotiate the lease so they can use our land to produce from Raven and wherever else they want to drill. They haven't responded," he said. According to a written statement from the family's attorney, Ray Givens, the total amount owed the family is $15 million. That figure includes the Oenga family's calculation of how much additional money it is owed in unpaid rent for BP's authorized use of the land, which was not part of the this lawsuit. In her ruling, Firestone said evidence from the trial showed that BP withheld critical information about Heald Point's strategic value for oil development when it negotiated a contract with the family to use the land. "Clearly, (BP) did not wish to share much with the plaintiffs," she wrote. Find Elizabeth Bluemink online at adn.com/contact /ebluemink or call 257-4317. Read more: http://www.adn.com/ 2011 /01/04/1631936/bp- closes- site - over - loss -in rent.html #ixzz1AB73YsM3 OPERABLE: NK-38A (PTD #20424~OA pressure manageable Page 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Monday, April 05, 2010 11:16 AM ~a~~ 4 (7 ~ [ v To: NSU, ADW Well Integrity Engineer; Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GPMA OTL; GPB, LPC DS Ops Lead; GPB, LPC DS Operator; Gerik, Bob G Cc: Janowski, Carrie Subject: OPERABLE: NK-38A (PTD #2042410) OA pressure manageable All, Producer NK-38A (PTD #2042410) was reclassified as Under Evaluation after the OA pressure broke MOASP on 03/19/10. The OA ressure was bled from 930 to 0 psi on 03/22/10 and built u to 780 ht. Since 03/23/10, the OA pressure has increase psl ay ma Ing I manageable by bleeds. The well has been reclassified as Operable. Please notify Well Integrity if the OA pressure become unmanageal~Te. Thank you, Toxin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Harmony Radio x2376 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 FF~~ rry ili 'i ~T~~~ j 1 ~ S , .. From: NSU, ADW Well Integrity Engineer Sent: Sunday, March 21, 2010 9:53 PM To: 'Regg, James B (DOA)'.; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy L (DOA)'; Rossberg, R Steven; Engel, Harry R; NSU, ADW Supervisor; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GPMA OTL; GPB, LPC DS Ops Lead; GPB, LPC DS Operator; Gerik, Bob G~ Cc: Quy, Tiffany; NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: Producer NK-38A (PTD #2042410) Sustained Casing Pressure on the OA All, Producer well NK-38A (PTD #2042410) has been found to have sustaine casing pressure on the OA. The well was worked over in August'09 to mitigate IAxOA communication by ceme g the OA to surface. Now the gas causing sustained casing pressure on the OA has been found to be from an xternal gas source, not lift or production gas. The wellhead pressure were tubing/IA/OA equal to 677/911/1020 on 9/10. The well has been reclassified as Under Evaluation. The plan forward is to attempt to: 1. DHD: Hold an open bleed for 2-1/2 hours 2. DHD: Monitor the OA build up rate over 3-5 d A wellbore schematic and TIO plot have Please let us know if there are any questions. Thank you, ~~ Anna dude, ~.~. (alt Toxin Roschinger) help understand the build-up rate and determine a next step cluded for reference. 4/7/2010 UNDER EVALUATION: Producer N1~8A (PTD #2042410) Sustained Casing~essure on the ... Page 1 of 1 Regg, James B (DQA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] 2 ~ ~. ~ ~y Sent: Sunday, March 21, 2010 9:53 PM '~~~ ~ ' To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr North (Gas Plants/GPMA); GPB, GPMA OTL; GPB, LPC DS Ops Lead; GPB, LPC DS Operator; Gerik, Bob G Cc: Quy, Tiffany; NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: Producer NK-38A (PTD #2042410) Sustained Casing Pressure on the OA Attachments: NK-38A.pdf; NK-38A TIO Plot.doc All, Producer well NK-38A (PTD #2042410) has been found to have sustained casing pressure on the OA. The well was worked over in August'09 to mitigate IAxOA communication by cemen ing u ace. ow a gas causing sustained casing pressure on the OA has been found to be from an external gas source, not lift or production gas. The wellhead pressure were tubing/IA/OA equal to 677/911/1020 on 3/19/10.`T~e we~as been reclassified as Under Evaluation. The plan forward is to attempt to: 1. DHD: Hold an open bleed for 2-1/2 hours 2. DHD: Monitor the OA build up rate over 3-5 days to help understand the build-up rate and determine a next step ~" A wellbore schematic and TIO plot have been included for reference. «NK-38A.pdf» «NK-38A TIO Plot.doc» Please let us know if there are any questions. Thank you, Anna Dude, ~.~. (alt Torin Roschinger) Well Inte rit Coordinator ~ ~~ ~ F. ~ ~~~ tt, w ~ GPB Welis Group Phone: (907) 659-5102 Pager: (907} 659-5100 x1154 3/22/2010 PBU_NK-38A PTD 204241 3/21/2010 TAO Pressures Plot Well: NK-38 4,000 3,000 2,000 1,000 -~ Tbg ~-- IA -~ OA OOA -a~-- OOOA On • • 12126.09 01102110 01109/10 01/16110 01!23110 01/30110 0210611ii 02/13/10 02/20/10 0212?i10 03106!10 03/13110 03120/10 TREE = CNV WELLHEAD = FMC ACTUATOR = BAKER KB. ELEV = 48.20' BF. ELEV = 20' KOP = Max Angle = 9163' 95° @ 15265' Datum MD = 14196' Datum TV D = 9850' SS 9-518" CSG, 47#, L-80 HY D 563 XO TO L-80 BTC I--~ 3778' 9-5/8" BOWEN CSG PATCH, 47#, L-80 BTC, ID= 8.681" 3835' 13-3/8" CSG, 68#, NT80 NSCC, ID - 12.415" 4544" • ~ ~~ ~+ I NIP *'~ELL ANC~E > 70° @ 13990 2211' 4-1/2" HES SSSV WELLSTAR, ID = 3.813" TOP OF 7" LNR ~-!_9003` Minimum iD = 3.725" @ 13368' 4-1 /2" HES XN NIPPLE WHIPSTOCK (02/11/05) -j 9163` MILLOUT WINDOW (NK-3$A) 9163' - 9179' 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, ~ ~ 1325$' .0152 bpf, ID = 3.958" 4-112" TBG STUB (08!16/09) 13265` EZSV (02/10!05) 9205' PERFORATION SUMMARY REF LOG: MWD GR ON 01!03/05 ANGLE AT TOP PERF: 90° @ 15504' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 15504 - 15743 O 03/13/05 2-1/2" 6 15793- 16396 O 03/13105 2-1/2" 6 16446 - 16556 O 03113/05 2-1/2" 6 16576 - 16676 O 03/13/05 9-5/8" CSG, 47#, NT-805 NSCC, ID = 8.681" ~4-1/2" TBG, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" ~ 7" LNR, 26#, L-80, BTC-M, .0383 bpf, ID = 6.276" ~ 4-1/2" LNR, 11.6#, L-80 LTC 8RD, .0155 bpf, ID = 4.000" i-j 1 3788' -~ 9-518" HES CEMENTER 3810' 9-5i8" HES ECP, ID = 8.681" X00' - 4540' 1517# ARCTIC SET CEMENT (06!07/05 GA S L. IFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3001 2969 22 MMG DMY RK 0 08/30/09 5 4928 4505 41 MMG DOME RK 16 08!30/09 4 6811 5512 65 MMG DMY RK 0 08/24/09 3 9156 6507 64 KBG-2 DMY BK 0 08/24/09 2 10787 7498 43 KBG-2 SO BK 24 08/30/09 1 12126 8507 37 KBG-2 DMY BK 0 08/24!09 9003' 9-518" X 7" BKR ZXP LTP w /BKR FLEXLOCK LNR HGR, ID = 6.330" 13128' ~~ 4-112" NDPG SENSOR, ID = 3.864" 13163" -~ 4-1 /2" HES X NIP, ID = 3.813" ~ 13193' 7" X 4-1/2" S-3 PKR, ID = 3.875" 3227" (-j4-112" HES X NIP, ID = 3.813" ~ 13273' 7" X 4-1/2" UNIQUE OVERSHOT 13303" 4-1/2" HES X NIP, ID = 3.813" 13324' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 13348' -r4-1/2" HES X NIP, ID = 3.813" 13368' 4-112" HES XN NIP, ID = 3.725" 13372' 7" X 5" BKR "HRD" ZXP LTP, ID = 5.00" 13381" 4-1/2" WLEG, ID = 3.958" 13394' 7" X 5" DG FLEX-LOCK HGR, ID = 4.430" 13404' 5" x 4-112" XO, ID = 3.940" DATE REV BY COMMENTS DATE REV BY COMMENTS 03101!95 ORIG COMPLETION, (POOL 7) 03/16/05 N9ES NK-38A SIDETRACK"A" 08/26!09 D16 RWO 08/27/09 TLH DRLG HO CORRECTIONS 09(01/09 MN/JMD DRLG DRAFT CORRECTIONS 09(11 /09 TLH GLV CORRECTIONS 16678' 4-112" FASDRILL PLUG PUSHED TO BTM (07/27109) 16678' PBTD NIAKUK UNIT WELL: NK-38A PERMIT No: 2042410 API No: 50-029-22540-01 SEC 36, T12N, R15E, 1410' FSL & 854' FE1 BP Exploration (Alaska) 17/1 Schlumberger r-, �. � NO. 5436 es Alaska Data & Consulting Services Li ,`, '��� Company: State of Alaska 2525 Gambell Street Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 - 2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD S MPC -04 AXBD -00061 MEMORY =GLS 11/17/08 1 1 NK -38A AWJI -00057 MEM PROD PROFILE nq 1 P06111 11/04/09 1 1 14 - 12 B3SQ - 00033 PRODUCTION PROFILE 11/13/09 1 1 13 -35 B14B -00084 INJECTION PROFILE V -Q 11/10/09 1 1 06 -08A B14B -00082 PLUGBACK SET WX-FLOYVCHECK - i9n9l 11/08/09 1 1 H -30 AVIH -00031 PRODUCTION PROFILE j 11/14/09 1 1 18 -11 A 82NJ -00038 MEM CNL & SCMT 111/06/09 1 1 Y -238 AYKP -00055 GLS - L n 11/22/09 1 1 N -24 AYS4 -00109 PRODUCTION PROFIL - 11/08/09 1 1 02 -31A AYKP -00053 PRODUCTION PROFILE _ 11/15/09 1 1 03 -01 BBK5 -00014 PRODUCTION PROFILE - 11/24/09 1 1 L -213 B581 -00017 INJ PROFILE W/WFL 11/19/09 1 1 W -209 AYKP -00054 INJ PROFILE W/WFL - 11/17/09 1 1 X -05 AP30-00072 PRODUCTION PROFILE 11/29/09 1 / X -07 AYS4 -00111 PRODUCTION PROFILE Q - 11/27/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd, Anchorage, AK 99503 -2838 10/01 SchWiderger NO. 5405 Alaska Data Consulting Services Company: State of Alaska 2525 Gembetl Street, Suite 400 Alaska Oil Gas Cons Comm Anchorage, AK 99503.2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job Log Description Date BL Color CD K -11 AY1M -00033 SBHP SURVEY I fC-ta 09/12/09 1 1 L4-30 AWL8-00031 PRODUCTION PROFILE y a 08/06/09 1 1 P2 -31 AP3O -00045 LDL 4/ 144 07/11/09 1 1 01 -29 B6JE -00009 PRODUCTION PROFILE OR 08/11/09 1 1 J -22A B69K -00013 PRODUCTION PROFILE 3,41 1:1M, ,c_' 08/30/09 1 1 W-44 81413-00071 IMENCZPISTill 09/06/09 1 1 12 -25 8581 -00010 1101114ft 1WA19:I•la l II418Ja tire,WF j02111rjWW're!27 08/22/09 1 1 L5 -33 AYKP -00051 SBHP SURVEY ;{1II11L iliEnatlf]!jAMII 09/01/09 1 1 P2-48 B69K -00015 SBHP SURVEY JiIEMIV f 09/01/09 1 1 Z -28 B69K -00016 INJECTION PROFIL _lc yi 09/19/09 1 1 0 -02A AP3O -00054 a>ji'1reserzfrigir N' 07/24/09 1 1 N-10A AXBD -00040 MEM PROD PR FILE :rs •�aSi1;111111r L 08/25/09 1 1 W -24 AWJI -00044 1 t ��i= r 15/09 1 1 V-03 8214J -00021 MEM PROD PROFILE V 08/ 09 1 1 H -148 B2WY -00026 MEM PROD PROFILE P1 -01 AY1M -00031 INJECTION PROFILE nijgiai9g r.'IC 08/20/09 1 1 P1-05 B581.00009 PRODUCTION PROFIL 'cQ }..f!] 08!20/09 1 1 NK -10 B2WY -00023 I' I ay i q it 08/22/09 1 1 13 -27A B2NJ -00019 MEMORY SCMT ■Ille a 08/13/09 1 1 18 -02B B2WY -00021 MEMORY SCMT as is air ,kill 08/19/09 1 1 NK -38A -00049 USIT r� 1 08/17/09 1 1 06 -09 SWL8 -00028 USIT j 1 07/30/09 1 1 13 -03A 09AKA0150 OH MWD/LW EDIT /I� =IIjn e 07/06/09 2 1 C -18B B2NJ -00017 �t•lf, 06109/09 1 1 1- 35/0 -25 B69K -00011 ClairFrnIMINW �x 08/26/09 1 1 04 -35A AXBD -00025 MCNL d n _L Ti 05/13/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data Consulting Services Petrotechnical Data Center LR2.1 2525 Gambell Street. Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 r i • • Page 1 of 1 Fleckenstein, Robert J (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Monday, September 21, 2009 12:04 PM To: Fleckenstein, Robert J(DOA); Saltmarsh, Arthur C(DOA) Cc: G ANC PDC Subject: NK-38A (PTD # 204-241) H~ Boa & art, Both of you have contacted me today requesting that I look at the recent 10-404 I submitted for this well. Your question / comment was that the Pool was likely incorrect. Per your guidance I did read Conservation Order 570 and it appears that you are correct. Please hand correct the Field and Pool to be: Prudhoe Bay Field / Raven Oil Pool - Thanks! Terrie ~~ ,;;~,, -~ ry y 9/21 /2009 STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMM~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: ^ Abandon ~ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ~ Alter Casing ~ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ~ Development ^ Exploratory 204-241 ~ 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22540-01-00 ~ 7. Property Designation: 8. Well Name and Number: ADL 034630 ~ PBU NK-38A .% 9. Field / Pool(s): ,~~JY~/ 0/L /~ODG ~'/ Prudhoe Bay Field / ~'I~T'PtTOI ~~~i 10. Present well condition summary Total depth: measured 16765 ~ feet true vertical gg23 ~ feet Plugs (measured) None Effective depth: measured 16678 ~ feet Junk (measured) 16645' true vertical gg~ 5/ feet Casing Length Size MD ND Burst Collapse Structural Conductor 80' 20" 80' 80' 1530 520 Surface 4504' 13-3/8" 4544' 4213' S020 2270 Intermediate 16023' 9-5/8" 9163' 6510' 6870 4760 Production Liner 4531' 7" 9003' - 13534' 6441' - 9598' 7240 5410 Liner 3391' 4-1/2" 13372' - 16763' 9482' - 9923' 8430 7500 Perforation Depth: Measured Depth: 15504' - 16676' True Vertical Depth: 9907' - 9915' Tubing (size, grade, measured and true vertical depth): 4-1/2", 12.6# L-80 13381' 9488' Packers and SSSV (type, measured and true vertical depth): ~~~ x 4-1/2" Baker'S-3' packer; 13194'; 9352'; 7" x 4-1/2" Baker'S-3' packer 13324' 9447' 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut, pull and dress tubing 13265'. Cut, pull and dress 9-5/8" to 3831'. Run 9-5/8" (47#, 1-80) tieback to 3835', cement w/ 247 Bbls Class'G (1.16 Yield). Clean out to PBTD. Run 4-1/2" (12.6#, 13Cr80) tubing to 13273'. ~2. Representative DailyAverage Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1,174 5,697 3,233 760 521 Subsequent to operation: 1,121 2,148 7,308 2,293 538 13. Attachments: ^ Copies of Logs and Surveys run 14. Well Class after work: ^ Exploratory ~ Development ^ Service ort of Well Operations ~ Dail Re y p ~ Welt Schematic Diagram 15. Well Status after work: ~ Oil ^ Gas ^ WDSPL ^ GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Mehrdad Nadem, 564-5941 309-250 ~ Printed Name Terrie Hubble Title Drilling Technologist P~Pared By Name/Number: ~ $1 nature Phone 564-4628 Date 9 Terrie Hubble, 564-4628 ~ Form 10-404 Revised 07/2009 ~ r Submit Original Only ~A~~~ ~~ ~'~'~ ,~"' ,~ <'~1~~ ~~`\ • i NK-38A, Well History (Pre Rig Workover) Date Summary 7/25/2009 RU SLICKLINE. RAN FLAPPER CHECK, EVENTUALLY HAD VALVE FUNCTIONING PROPERLY. DRIFT TUBING W/ 3.70" CENT S.BAILER TO 14 172' "DEVIATION". LEFT WELL SHUT IN , NOTIFIED PAD OP ON DEPARTURE. 7/26/2009 T/I/0=1880/650/700 temp=Sl Assist E-line, Load IA Rigged up to IA and pumped 170 bbls 110° crude to load for E-line. Unit problems - Shut down job. FWHP's= 1380/150/720 7/26/2009 T/I/0=1400/700/700 Assist E-line, Load Tubing/IA (Pre RWO) Rigged up to IA and pumped 599 bbis 110° crude to load. Rigged up to Pump in sub and pumped 290 bbls crude to load TBG. Stand by for E- line to set plug. 7/26/2009 T/i/0=1420/700/800. Temp=Sl. TBG & IA,OA FL (E-line call-in). TBG FL 6342'. IA FL Q 10794' (so). OA FL C~ 550'. E-iine has control of valves. 7/26/2009 WELL SHUT-IN ON ARRIVAL. SSV=O, WV=C, MV = O, IA/OA = OTG. INITAL T/I/O = 1420/700/800. DHD SHOT FLUID LEVELS TBG FL = 6342' IA FL = 10700', OA = 550'. LRS PUMP 640 BBL DOWN IA, 290 BBL DOWN TUBING. AFTER PUMPING T/I/O = 100/100/700. RIH WITH HES 4-1/2" FASDRILL BRIDGE PLUG 3.66" O.D. CURRENTLY CORRELATING FOR PLUG. 7/27/2009 CMIT-TxIA to 3500 psi PASS MIT-OA to 2000 psi PASS (Pre RWO) Pumped 192 bbls 110° crude down TBG to reach test pressure. On second test T/IA lost 20/20 every 15 min's for 1 hr. 3rd test-T/IA lost 20/20 psi in 15 min's, 0/20 psi in second 15 min's, 20/0 in 3rd 15 min's, for a total loss of 40/40 psi in 45 min's. Fail. Bled T/IA pressures to 500 psi for next test. RD TBG, RU OA. Pumped 44.9 bbls 110° crude down OA to reach test pressure. On first test, OA lost 130 psi in 15 min's, 50 psi in second 15 min's, for a total of 180 psi in 30 min. Pass. Bled OAP (5 bbls). RD OA, RU TBG. Pumped 14 bbls crude down TBG to bring TxIA to test pressure. On first test T/IA lost 40/40 psi in 1 st 15 min & 20/20 psi in second 15 min, for a total loss of 60/60 psi in 30 min. Pass. Bled TxIAP (19 bbls). DSO & PE notified of results. E-Line in controll of well upon departure. FWHP's=20/20/320 Tags hung. IA & OA open to gauges. 7/27/2009 SET 4-1/2" HES FASDRILL PLUG AT 13411' (MID-ELEMENT), DEPTH REFERENCED TO TUBING TALLY DATED 2-MARCH-2005. LRS MIT OA TO 2000 PSI, PASSED. CMIT TxIA TO 3500 PSI, PASSED. CUT TUBING WITH ~,,65" SCP POWER JET CUTTER AT 13262'. REFERENCED TO TUBING TALLY DATED 11-MARCH-2005, IN THE UPPER 10' OF THE FIRST FULL JOINT ABOVE THE PACKER. FINAL T/I/O = 200/0/325 SSV=O, MV = O, WV =C, MV = O, IA/OA = OTG, CONFIRMED WITH DSO. WELL SHUT-IN ON DEPARTURE. JOB COMPLETE. 7/30/2009 T/I/0=0/0/300 Temp=S/I Circ well ( RWO prep ) Attempted circ out. Pumped 5 bbls neat meth spear followed by 190 bbls 110° seawater into TBG while taking returns up IA & down F/L. Unable to get good rate going through TBG cut. Job postponed. Pumped 30 bbls 60° diesel into TBG for F/P. Pumped 10 bbls neat meth down F/L for F/P. FWHP's=0/500/340 DSO notified of following upon departure, SWV, SSV, PitV = S/I MV, IAV, OAV - open to gauges, tags hung. 7/31/2009 WELL SHUT IN ON ARRIVAL. VERIFIED TRSV C«3 2115' MD FUNCTIONIf~I~ GORRECTLY W/ FLAPPER CHECKER. SET 4-1/2" SLIP STOP CATCHER C~3 12271' SLM (TBG CUT AT 13,262' MD). 8/1/2009 PULLED STA.#2 BK-OGLV @ 10790' SLM/10794' MD. PULLED STA.#5 RK-LGLV C«~ 4904' SLM/4924' MD. SET RK-DGLV IN STA.#5 C~ 4904' SLM/4924' MD. FIVE ATfEMPTS AT SETfING STA.#2 C~ 10794' (LOCATING BUT SITTING DOWN). NOTE: TOOLS SITTING DOWN AT GLM #4  WHEN RIH TO SET ST#2. 8/2/2009 SET BK-DGLV IN STA.#2 C 10790' SLM/10794' MD (3RD ATTEMPT). LRS ATi"EMPT TO MIT-T TO 3,000#, LLR OF 1 BPM AT 3000psi. RIH TO TAG 4-1/2" SLIP STOP CATCHER W/ 3.50" LIB. 8/2/2009 T/I/O~ 700/640/320 Temp= S/I. Assist Slickline as directed. (RWO Prep) Pumped a total of 40 bbls 60° diesel down TBG to pressure up and achieve a LLR of 1 bpm ~ 3000 psi for 10 bbls, While IAP slowly increased, SD pump and monitored TBG & IAP for 5 min. TBG pressure dropped from 3000 psi to 1720 psi, TBG & IAP equalized C~ 1720 psi, Bleed TBG & IAP, Bleed back -15 bbls. Page 1 of 2 ~ • NK-38A, Well History (Pre Rig Workover) Date Summary 8/3/2009 Temp= SI Assist Slickline pump as directed (RWO Prep) No fluids pumped, RDMO. 8/3/2009 TAG SS C-SUB W/ 3.50" LIB C~ 12271' SLM AND VERIFIED EMPTY. PULLED BK-DGLV FROM STA.#1 C~3 12130' SLM/12,132 M.D AND LEFT EMPTY. RIH W/ 4-1/2" GS. PULLED EMPTY SLIP STOP CATCHER 12271' SLM. TAG SVLN WITH 3.84" NO-GO AT 2098' SLM/2115' MD. SET 4-1/2" HOLD OPEN SLEEVE IN TRSV C~3 2098' SLM. LEFT WELL SHUT IN,TURNED WELL OVER TO PAD OPER. 8/4/2009 T/I/0=1000/1000/320 Circ out TBG & IA (Pre RWO) Pumped 5 bbls neat meth followed by 844 bbls SW, 370 bbls 1% KCL and 137 bbls DSL (u-tubed into IA for freeze protect) down TBG, up IA, taking returns to the flowline. FP FL with 10 bbls neet meth. Pump up press. on Tx IA to 4000 psi with 10 bbls diesel. CMIT Tx IA to 4000 Psi. Tx IA lost 20/30 psi in 15 Min then Tx IA lost 0/10 psi in 2nd 15 Min. for a total loss of 20/40 Psi in 30 Min. CMIT is a Pass. Bled WHP's to 0 Psi. RDMO. FWHP=O/0/0. Wing- shut / Swab-shut / SSV-shut / Master-open IA and OA open to gauges. Operator notified. 8/5/2009 T/I/0= 0/0/400 Bled OA pressure to 0 psi post circ-out. RDMO. Final WHP"s=0/0/0. Operator notified. 8/8/2009 T/I/O=Vac/0/0. Set 4-1/16" CIW H BPV thru tree, pre rig. 1-2' ext used, tagged @ 98". No problems. 8/12/2009 T/I/0=900/750/60. Freeze Protect Tbg of NK-18 due to RWO on NK-38. (Pre RWO) Pumped 3 bbls of neat methanol and 40 bbls of diesel down Tbg to freeze protect. Final WHP's=700/750/60. Page 2 of 2 • ~ BP EXPLOR~4TION Page 1 of 12 Operations Summary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 Date Frorn - To Hours Task Code NPT Phase Description af Operations 8/12/2009 11:00 - 12:00 1.00 RIGD P PRE Rig down floor, prep to lay down derrick. Haul Pump and Generator modules to Niakuk. 12:00 - 12:30 0.50 RIGD P PRE Lay down derrick and secure for move. 12:30 - 13:00 0.50 MOB P PRE Move rig off J-11A and stage on pad to remove BOP and instail booster wheels. 13:00 - 14:00 1.00 MOB P PRE Remove BOP stack and install and secure on moving cradle. P/U mats and herculite and clean up around well. 14:00 - 16:00 2.00 MOB P PRE Install front and rear booster wheels. Haul misc rig equipment to Niakuk 16:00 - 00:00 8.00 MOB P PRE Move Rig from J-Pad, Rig at intersection of Spine road and 8/13/2009 00:00 - 04:00 4.00 MOB P 04:00 - 08:00 4.00 MOB P 08:00 - 13:30 5,50 MOB P 13:30 - 18:30 5.00 MOB P 18:30 - 00:00 I 5.50 MOB P 8/14/2009 00:00 - 12:00 12.00 MOB P 12:00 - 14:00 2.00 MOB P 14:00 - 15:00 1.00 MOB P 15:00 - 16:00 1.00 MOB P 16:00 - 18:00 I 2.00 I MOB I P 18:00 - 19:00 1.00 RIGU P 19:00 - 19:30 0.50 KILL P 19:30 - 20:00 0.50 KILL P 20:00 - 22:30 I 2.501 KILL I P 22:30 - 23:00 I 0.501 KILL I P Oxbow road C~ 22:30 hrs. Rig at intersection of Oxbow road and DS-15 @ 00:00 hrs. PRE Move rig From intersection of Oxbow and DS-15 to infront of PBOC. PRE Wait on mats currently being moved from the Nordic Rig 2 rig move from C-Pad to DS-18 prior to proceeding on the East dock road. PRE Move from PBOC on East dock road to L-5. Stage rig on L-5. PRE Haul and stage mats on L-5, lay +/- 400 mats on Niakuk access road. Move camp from Price Pad to east dock. Began move C~3 14:30 hrs and camp on East dock pad C~? 18:00 hrs. PRE Move Rig to end of mats, begin rig mat shuffle process. PRE Continue shuffling rig mats until rig is on location, PRE Stage rig on Niakuk pad. Remove booster wheels. Install BOP stack on stump in cellar. PRE Spot Rig over NK-38A and shim in place. Spot flowback tank and rig slop tank. PRE Hold PJSM with rig crew on raising derrick. Assign people to positions, discuss dropped objects hazards and identified pinch points. Raise derrick and pin in place. PRE Bridle down and RU floor equipment. Install double IA valve in cellar. RU circulating manifold and tie OA in to hardline & choke going to flowback tank. Accept Rig for o erations ~ 18:00 hrs 8/14/2009 PRE Take on 8.5 ppg seawater in pits, Spot pump and generator modules. R/U and test hard line and choke manifold to flow back tank to 3,500 psi. Good test. Zero pressure on tubing and IA. DECOMP Install DSM lubricator and test to 500 psi. Good test. Pull BPV and riq down lubricator. DECOMP PJSM covering circ out freeze protect and displacing to clean seawater with all personnel involved. Assign people to watch flowback tank and cellar discussed spotting trucks, fluid transters and stopping the job if nesessary. DECOMP R/U on IA and circ out 40 bbls diesel from tubing at 5 bpm 310 psi, shut down line up and pump down tubing to circ out remaining 110 bbls diesel, pumped a total of 178 bbls to flow back tank. Continue displacing entire hole volume of 765 bbls C~3 7 bpm with 740 psi. Shut down and monitor well - well static. DECOMP Drain tree. Drv rod in TWC with FMC. Printed: 9/7/2009 10:12:19 AM • s BP E?~PLORATION' Page 2 ofi 12 i Op~rations Summary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 Date Frorn - To Hours Task Ct~d~ NPT Phase Description caf Oper~tians 8/14/2009 23:00 - 00:00 1.00 KILL P DECOMP Test TWC from below to 1000 si, record on chart held for 10 min. Good test. 8/15/2009 00:00 - 00:30 0.50 WHSUR P DECOMP Test TWC fro v t 00:30 - 01:00 0.50 WHSUR P DECOMP Blow down circulating lines test manifold and lines to flow back tank. 01:00 - 02:30 1.50 WHSUR P DECOMP Nipple down tree and adapter flange, inspect hanger lifting threads. Threads looked good. 2 barriers for ND are 1) tested FasDrill at 13411' and 2) tested TWC in tubing hanger. 02:30 - 04:00 1.50 BOPSU P DECOMP Nipple up BOP, choke line, riser and turnbuckles. 04:00 - 05:00 1.00 BOPSU P DECOMP Rig up BOP test equipment, fill stack with water. 05:00 - 09:30 4.50 BOPSU P DECOMP Test BOPE to 250 psi low, 3,500 psi high. Per poyon and BP testing procedure. Test 2-7/8" VBRs with 4-1/2" and 2-7/8" test jt. Test annular with 2-7/8" test jt. AOGCC rep, Bob Noble, waived witness of BOP Test. Test witnessed by Doyon Toolpushers Pete Martinusen & David Evans, WSLs Brian Buzby & Abbie Barker. 09:30 - 10:00 0.50 BOPSU P DECOMP RD BOP test equipment. Drain stack. 10:00 - 11:00 1.00 WHSUR P DECOMP Install Dutch riser s stem. PU DSM lubricator. Test lubricator to 500- si. Pull TWC. LD lubricator and TVVC. 11:00 - 11:30 0.50 BOPSU P DECOMP Drain stack. LD Dutch Riser. install regular riser. 11:30 - 12:00 0.50 PULL P DECOMP MU landinq jt with 4-1/2" TCII XO. RIH and screw into tubing hanger with 8-1/4-turns. MU to top drive. FMC rep BOLOSs. 12:00 - 12:30 0.50 PULL P DECOMP Hold PJSM with rig crew, FMC and Camco reps on pulling hanger. Assign people to positions, review job steps, highlight well control considerations. Pull hanger free with 155K-Ibs and then ull to floor with a PU wt = 185K-Ibs. 12:30 - 14:00 1.50 PULL P DECOMP Circulate one wellbore volume at 8-BPM with 540-psi. RU control line spooling unit and 4-1/2" handling equipment while circulating. Monitor well - Static. 14:00 - 14:30 0.50 PULL P DECOMP Break out tubing hanger and LD. LD landing jt. Change out elevators. Blow down top drive. 14:30 - 16:00 1.50 PULL P DECOMP POH and LD 4-1/2" 12.6# L80 IBT-M tubinq, spooling up single 1/4" SS control line. 16:00 - 16:30 0.50 PULL P DECOMP Terminate control line at SSSV. RD control line spooler. Recovered 50-SS bands of 52-SS bands reported. 16:30 - 19:30 3.00 PULL P DECOMP Continue to LD 4-1/2" 12.6# L80 IBT-M completion through pipe shed from 10,230' to 6814' 19:30 - 20:00 0.50 PULL P DECOMP Service top drive and rig floor equipment. 20:00 - 00:00 4.00 PULL P DECOMP Continue to lay down 4-1/2" 12.6# L-80 IBT-M tubing and jewelry from 6,814' to 1124'. 8/16/2009 00:00 - 01:00 1.00 PULL P DECOMP Continue to Lay down 4-1/2" 12.6# L-80 IBT-M Tubing and jewelry. Recovered a total of 308 jts, 6 GLM's, WellstarTRSV, cut joint 10.16' and 50 SS bands. Cut joint flared out to 4.750" 01:00 - 01:30 0.50 PULL P DECOMP Rig down casing tools and clear floor, Mobilize Baker tools to rig floor. Install wear ring. 01:30 - 02:00 0.50 CLEAN P DECOMP PJSM covering picking up BHA and DP. 02:00 - 08:00 6.00 CLEAN P DECOMP Make u BHA consistin of 6" Dressoff shoe, 3 ea wash pipe extensions, 4-13/16" top mill, Junk basket, dbl pin crossover, 7" casing scraper, Bit sub, Bumper sub, Oil jar, crossover, 6 ea 4-3/4" DC's, 129 jts 4" DP (PU from pipe shed), 2 ea crossovers, 9-5/8" casing scraper, 2 ea crossovers = 4326.13'. Printed: 9/1/2009 10:12:19 AM . ~ BP EXPLORATIQN Page 3 of 12 Operations Sumrnary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' Date Frc~m - To HQUrs Task Code NPT Phase Description of Operations 8/16/2009 08:00 - 16:00 8.00 CLEAN P DECOMP RIH with BHA #1 on 4" DP from the pipe shed to 13,229'. (P/U and SO weights above liner top, Up 156k, Dn 121 k) 16:00 - 16:30 0.50 CLEAN P DECOMP M/U top drive and break circulation obtain milling parameters. Up wt. = 245k, Dn wt = 142k, Rt wt. = 180k, 60 rpm, torque 11-14K. Pump rate 6 bpm with 1000 psi. ( work 7" casing scra er from 13,166' to 13,229' 16:30 - 18:00 1.50 CLEAN P DECOMP Wash down and ta to of tubin stub with washover shoe ~ 13,264' , Mill over top of stub with above parameters, continue washing over and engage top dressoff mill on tubing stub, as dressoff mill engaged tubing stub had pressure increase to 1500 psi reduce pump rate and dressoff tubinq stub to 13,265'. Pickup and work washover shoe over tubing stub several times with no rotation. No problem. 18:00 - 19:30 1.50 CLEAN P DECOMP Pump 20 bbl hi-vis sweep back to surface ~ 8 bpm with 1900 psi, at bottoms up saw dis-colored seawater but nothing when sweep came back. 19:30 - 20:00 0.50 CLEAN P DECOMP Monitor well, and blow down topdrive. well static. 20:00 - 21:30 1.50 CLEAN P DECOMP POH from 13,230' to the top of the 7" liner C~ 9,000' 21:30 - 22:30 1.00 CLEAN P DECOMP Circulate bottoms u at liner to to ensure hole is free of debris for USIT lo . CBU at 11.5 bpm ~ 2700 psi rotating string at 60 rpm with 4.5k torque, reciprocate pipe during circulation. Up wt = 156k, dn wt = 121 k, Rt wt = 135k A considerable amount of araffin came across shakers at bottoms u 22:30 - 23:00 0.50 CLEAN P DECOMP Monitor well, Pump dry job and blow down topdrive. 23:00 - 00:00 1.00 CLEAN P DECOMP POH from 9,000' to 6,405' 8/17/2009 00:00 - 02:00 2.00 CLEAN P DECOMP POH from 6405' to 231' 02:00 - 02:30 0.50 CLEAN P DECOMP Stand back 2 stands of 4 3/4" DC's, lay down dress off BHA. Washover shoe had two spots approximately 1" deep were it had contacted the tubing stub. The top dressoff mill showed good wear patern were it had rotated on tubing stub. Junk basket was empty. 02:30 - 03:00 0.50 CLEAN P DECOMP Clear floor of all Baker tools. 03:00 - 03:30 0.50 EVAL P DECOMP PJSM with rig crew and Schlumberger personnel. Bring E-line tools to floor R/U top sheave and P/U e-line tools string and test USIT tool for proper operation. 03:30 - 12:30 9.00 EVAL P DECOMP RIH with USIT logging tools. Log up for corrosion from 4-1/2" tubing stump through 7" liner into 9-5/8" casing up to 4600'. Log up for cement from 4600' to surface. 12:30 - 13:00 0.50 EVAL P DECOMP RD Schlumberger E-line unit and logging tools. 13:00 - 13:30 0.50 EVAL P TIEB1 Send USIT logs to RWO engineers and select cut depth of 3830'. 13:30 - 15:00 1.50 DHB P TIEB1 old JSM with Halliburton on running 9-5/8" RBP. MU RBP. RIH on 4" DP from derrick. 15:00 - 15:30 0.50 DHB P TIEB1 Set 9-5/8" RBP with top 3990'. Stand back 1-std of 4" DP. RU to test RBP. 15:30 - 16:00 0.50 DHB P TIE61 Test RBP to 1000-psi for 10-charted minutes. Good test. RD test equipment. 16:00 - 19:00 3.00 DHB P TIEB1 U sand hopper. Dump 44-sks (50') of 20/40 mesh river sand on top of RBP. 19:00 - 20:00 1.00 DHB P TIEB1 Slip & cut drilling line. (Circulate DP volume C~ 1 bpm 100 psi while cutting line) 20:00 - 21:00 1.00 DHB P TIEB1 Taq Sand C~ 3938'. Move 9 stands of DP from drillers side to Printed: 9/1/2009 10:12:19 AM ~ ~ BP EXPLORAT[QN Pag~ 4 af 12 Qperations Sumrnary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 8/17/2009 21:00 - 21:30 0.50 FISH P 21:30 - 00:00 2.50 FISH P 8/18/2009 00:00 - 00:30 0.50 FISH P 00:30 - 01:00 0.50 FISH P 01:00 - 01:30 0.50 FISH P 01:30 - 03:00 1.50 FISH P 03:00 - 03:30 0.50 FISH P 03:30 - 04:00 0.50 FISH P 04:00 - 04:30 0.50 FISH P 04:30 - 06:00 ~ 1.50I FISH I P Phase Qe$eription of Qperations TIEB1 Monitor well. Pump dry job. Blow down topdrive. TIEB1 POH lay down 39 stands of 4" dp from 3,900' to 697' to allow room for 14" UHT Eckel double stack tongs. TIE61 POH lay down 39 stands of 4" dp from 697'. Lay down 6 4 3/4" DC's and lay down RBP setting tool. TIE61 Clear floor, Mobilize Baker tools to rig floor TIE61 PJSM, Pickup Baker 8-1/4" Multi string casing cutter, XO, 8-1/2" stabilizer, XO TIEBi RIH with Casing cutter. Tag sand C~ 3935', Up wt = 97k, Dn wt = 95k TIE61 M/U Topdrive and break circulation. Attempt to locate collars but unable to definitively locate collars due to NSCC connections. Lay down single and position Cutter on depth to cut casing C~3 3830' TIEB1 PJSM, with all personnel covering cutting casing and circ out dead crude. TIEB1 Rig up Little Red and Test lines to 3,500 psi. Cut 9 5/8" casing ~ 3830'with 60 r m, 2k torque, stage pumps up rom pm, ~ 190 psi. 4 bpm ~ 350 psi, 5 bpm ~ 570 psi. 6 bpm C~ 850 psi. Positive indication of cut as pressure dropped from 850 psi to 250 psi and torque dropped from 5k to 2k. TIEBi Close annular and oaen ua to flowback tank establish 06:00 - 07:00 1.00 FISH P TIE61 07:00 - 08:00 1.00 FISH P TIEB1 08:00 - 09:00 1.00 FISH P TIE61 09:00 - 09:30 0.50 FISH P TIE61 09:30 - 10:30 1.00 FISH P TIE61 10:30 - 12:00 1.50 FISH P TIE61 12:00 - 12:30 0.50 WHSUR P TIEB1 12:30 - 13:30 1.00 BOPSU P TIEBi 13:30 - 14:30 I 1.001 FISH I P I I TIE61 14:30 - 15:30 I 1.001 WHSUR I P I I TIE61 returns to tank. Shut down pumps open annular antl close UA. P/U to ensure knives are free. Line up to Little Red and pump 180 degree diesel at 1 bpm. Pump 35 bbis diesel. Shut down, close annular, open up to flowback tank and pump remaining 25 bbls diesel. Follow with 42 bbls 120 degree 9.8 ppg brine @ 2 bpm. Shut in and allow diesel to soak in OA. Pump remaining 248-bbis of 120-degree brine at 5-BPM with 540-psi. Crude and diesel returns at flowback tank with small amount of thick, chunkv material seen. Pump 40-bbl Safe Surf O sweep and chase out of the hole with heated seawater at 7-BPM with 1250-psi. When clean seawater seen at the flowback tank, open bag and close OA. CBU at 7-BPM with 880-psi. Monitor well - slightly out of balance. Pump 1/2-drillpipe volume. Monitor well - static. Pump dry job and blow down top drive. POH with casing cutter, standing back DP on off driller's side. LD casing cutter. Pull wear ring. MU 9-5/8" packoff pulling tool, RIH and pull pack-offs.. PJSM. Drain stack, pull drilling riser, and backoff turnbuckles. N/D wellhead between the Casing and Tubing Spools. P/U on stack to qain access to the 9-5/8" CasinQ slips. RIH with 9-5/8" Spear and enqage in top of 9-5/8" Casing.. PJSM. P/U to 270-K-Ibs and pull csinq free. Continue POH until FMC tech is able to work on the slips. Remove slips. String weight is 205K-Ibs with Top drive. Clean API ring. Set down BOP stack with casing Spool. Install an torque studs. Hold PJ M to release spear in order to Printed: 9/1/2009 10:12:19 AM ~ • BP' EXPLt7RATION Pa~e 5 of ~ 2 ` Operations Summary Report Legai Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase D~scription caf Operations 8/18/2009 14:30 - 15:30 1.00 WHSUR P TIE61 reinstall drilling riser. Set Casing back down and unsting from casing; install drilling riser and inflate air boots. 15:30 - 16:30 1.00 FISH P TIEB1 P/U spear, RIH and re-engage in 9-5/8" casing and POH to get ready to break off spear with 9-5/8" cutoff. PJSM to bring 9-5l8" stacked tongs to rig floor and to R/U tongs to break-out the 9-5/8" spear with the cutoff joint. 16:30 - 17:30 1.00 FISH P TIE61 POH with the cutoff joint and break out with the stacked tongs. Breakout torque was 40K-Ib-ft. UD cutoff joint and spear. Top Cut-off joint length is 39.41'. 17:30 - 18:00 0.50 FISH TIEB1 Pressure test break between tubinq and casinq spool to 1.000 ~si, good test. 18:00 - 19:00 1.00 CASE P TIEB1 Install TIW valve with XO to 9-5/8", M/U to cement/circulating line and Circulate complete circulation ~ 9 bpm, w/ 560 psi. 19:00 - 23:00 4.00 CASE P TIE61 Lav down 9-5/8" 47# NT-80 NSCC casing from 3,800' to surface. Recovered a total of 92 full jts, top cut jt, 39.42' bottom cut off jt 2.78' cut was flared to 10-3/4" 23:00 - 23:30 0.50 FISH P TIEB1 CLear floor, Break out lift sub in spear and lay down, 23:30 - 00:00 0.50 FISH P TIEB1 Load & strap 6-1/4" DC's, mobilize Baker tools to rig floor. 8/19/2009 00:00 - 00:30 0.50 FISH P TIEB1 Perform Topdrive inspection. 00:30 - 01:00 0.50 FISH P TIE61 Install long wear ring 01:00 - 03:00 2.00 FISH P TIEB1 Picku 9-5/8" dressoff BHA consisting of 12-1/8" dressoff shoe, washpipe extension, washoverjunkbasket, xo,13-3/8 casing scraper, xo w/ float, casing brush, xo, bumper sub, xo, 6 ea 6-1/4" DC's, xo = 231.29' 03:00 - 04:00 1.00 FISH P TIEBi RIH with dressoff BHA to 3800' 04:00 - 05:00 1.00 FISH P TIEB1 Break circulation and obtain milling parameters. Up wt = 110k, Dn wt = 102k, Rt wt = 107k, 60 rpm, Torque 3k, pump rate 6 bpm ~ 160 psi. Wash down from 3,800' taq stub C~ 3830iP/U and rotate down with 40 rpm, dress off stub with washover shoe, tag up on stub with top dress mill and mill 1' to 3,831'. Work mills over stub several times with no rotation. IVo problem. 05:00 - 06:00 1.00 FISH P TIE61 Pump 40 bbl safe-surf0 pill surface to surface C~3 11 bpm with 1100 psi. 06:00 - 08:30 2.50 FISH P TIEB1 POH and S/B DP and DCs in Derrick and ensure there is room for the 9-5/8" power tongs. B/O and UD 9-5/8" Dress-off BHA. 08:30 - 09:00 0.50 FISH P TIEB1 Clear and clean Rig Floor. 09:00 - 09:30 0.50 CASE P TIE61 P/U landing joint M/U to wear ring run/pull tool, RIH and pull wear ring. 09:30 - 10:30 1.00 CASE P TIEB1 R/U Doyon Casing Torque Turn equipment and computer. Prepare to RIH with the 9-5/8" Tieback completion. 10:30 - 11:00 0.50 CASE P TIEB1 PJSM for P/U and RIH with the 9-5/8" Tieback string. See "Remarks". 11:00 - 11:30 0.50 CASE P TIE61 P/U the Baker External Casing Patch with pup, Baker Isozone External Casing Packer, pup joint and remove the protective packing from around the EC Packer and RIH. P/U the Halliburton ES Cementer with pups and BakerLok it to the EC Patch assembly and torque to 10K-Ib-ft. P/U the XO joint and BakerLok and torque up to the ES Cementer assembly with 10K-Ib-ft. 11:30 - 12:00 0.50 CASE P TIE61 Make crew change and hold PJSM with new crew using the same format referenced in the 1030-1100-hrs time summary. The only difference is that this crew has utilized the 9-5/8" Printed: 9/1/2009 10:12:19 AM ~ ~ BP EXPLQR~4TIQN ' Page 6 of 12 Operations Summary Report Legal Well Name: NK-38 Common Wel! Name: NK-38A Spud Date: 1/1 /1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 Date From - To Hours Task Code NPT Phase Description of Operatic~ns 8/19/2009 11:30 - 12:00 0.50 CASE P TIE61 power tongs for several 9-5/8" running and pulling jobs. 12:00 - 18:00 6.00 CASE P TIEB1 RIH with 9-5/8", 47#, L-80, H dril 563 casing u_sing Jet Lube Seal Guard and torquing all connections to 15,800-Ib-ft. Stop at 20-joints RIH at 1315-hours and hold quick discussion about the routine of RIH. There were no questions or concerns rendered, so continue RIH. Joint #50 RIH at 1530-hours. Joint #97 RIH at 1800-hours. P/U and M/U 10' pup joint. P/U weight 200K-Ibs, S/O weight 200K-Ibs which includes 40K-Ibs for Top drive RIH slowly to P/U the XO pup and tag stub, taking 4K-Ibs, Stop RIH, M/U 9-5/8" crossover pup jt, Slack off and set down 25k to no-ao casinq patch on casinq stub. P/U to 225k, 25 18:00 - 19:30 1.50 CEMT P TIEB1 M/U Halliburton cement head and R/U circulating lines. Test lines to 3,000-psi. Pressure up to 1000-psi for 10-min. record on chart. Increase pressure to 1600-psi to inflate ECP. Pressure bled down to 1350- si and held until ressure stabilized, increase pressure to 2,000-psi to close inflation valve and held for 10-min recorded on chart. Bleed ressure to zero. Pressure up to open ES cementer; oqened with 2800-psi. 19:30 - 20:00 0.50 CEMT P TIE61 Circulate ~ 9-BPM with 600-psi until 84-deg-F seawater back at surface. Held PJSM with all rig and third party personnel. 20:00 - 22:30 2.50 CEMT P TIE61 Batch Up cement. Pump 5-Bbls water and test lines to 3,500-psi. Pump 246.6-Bbis class G cement weighted to 15.8- @ 5.5-BPM I P 300-psi, -psi. ut own and drop ES cementer closing plug; kick out with 10-Bbls freshwater. (Confirmed plug left head) Displace cement with rig pump at 5-BPM. ICP 110-psi caught cement 130-Bbls into displacement. Slowed rate to 3-BPM for the last 15-Bbis. Bum ed lu 1-Bbl over calculated dis lacement. Pressure u and close ES cementer, closed with 2,350-psi. Diverted last 50-Bbis to slo tank. 25-Bbls cement returned to surface. CIP C~3 22:20 hrs. Bleed off pressure and check for flowback. 22:30 - 23:00 0.50 CEMT P TIE61 Flush stack with 40-Bbl citric pill. Rig down cement head and circulating lines. Vac out fluid from casing joint. 23:00 - 00:00 1.00 WHSUR P TIE61 Split stack between tubing head and casing spool. Pickup stack and set sli s with 100k. Set up WACHs cutter and prepare to make cut. 8/20/2009 00:00 - 01:00 1.00 WHSUR P TIEB1 Cut 9-5/8" casin with WACHs cutter. Lay down cut off joint; length of cutoff = 14.55'. Prep well for new packoff. 01:00 - 02:00 1.00 WHSUR P TIEB1 M/U packoff running tool and install new packoff. 02:00 - 03:00 1.00 BOPSU P TIEB1 Nipple up BOP. 03:00 - 03:30 0.50 BOPSU P TIEB1 Pressure test new 9-5/8" packoff and break to 3,800-psi for 30-min. 03:30 - 04:00 0.50 BOPSU P TIEB1 Make up stack flushing tool and flush stack. Function rams to move out any cemenUjunk. 04:00 - 05:00 1.00 FISH P TIE61 Make u 8-1/2" Drill out assembl consisting of: 8-1/2" Bit, 3 ea junk baskets, bit sub, bumper sub, oil jar, crossover, 6 ea, 6-14" DC's, crossover = 222.92' 05:00 - 08:00 3.00 FISH P TIEB1 RIH with Drill out BHA Picking up 4" DP from Pipe Shed. UCA test shows 500-psi should be reached -0900-1000-hours. 08:00 - 09:30 1.50 CASE P TIEB1 Circulate seawater from Pits 3-BPM, 40-psi to wait for UCA 500-psi test time. Printed: 9/1/2009 10:12:79 AM • . BP' EXPLORATIC7N Page 7 af 12 Operations Summary R~por# Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' Date Frc~m - To Haurs Task Code NPT Pha 8/20/2009 09:30 - 14:00 4.50 CASE P TIEBi 14:00 - 14:30 0.50 CASE P TIE61 14:30 - 15:00 0.50 CASE P TIEB1 15:00 - 17:00 I 2.00 I CASE I P I I TIEB1 17:00 - 17:30 I 0.501 CASE I P I ITIEBI 17:30 - 18:30 1.00 CASE P TIEBi 18:30 - 19:00 0.50 CASE P TIEB1 19:00 - 19:30 0.50 CASE P TIE61 19:30 - 20:00 0.50 CASE P TIE61 20:00 - 22:30 I 2.501 CASE I P I I TIEB1 22:30 - 23:00 I 0.501 CASE I P I ITIEBi 23:00 - 00:00 1.00 CASE P TIE61 8/21/2009 00:00 - 01:00 1.00 CLEAN P CLEAN 01:00 - 01:30 I 0.501 CLEAN I P I I CLEAN 01:30 - 02:30 1.00 CLEAN P CLEAN 02:30 - 03:30 1.00 CLEAN P CLEAN `__"r"_" _ _~_.;_ _"'_"._ RIH with Jts #111 and #112. P/U #113, get parameters: P/U wt 105K-Ibs, S/O wt 100K-Ibs, 8-BPM C~ 490-psi. Continue RIH with#113 to soft tag cement at 3774'. P/U and start rotating at 70-RPM, free torque 3K-Ib-ft. Slowly RIH with bit and find hard cement at the ES Cementer at 3787'. Continue drilling with 5K-Ibs WOB, 3K-Ib-ft torque, 70-RPM, 8-BPM, 480-psi. Ream through the cementer twice with a stand of DP. P/U another stand of DP from Derrick and resume drilling up shoe tract; still getting harder, but keeping 3-5K-Ibs WOB for 1-stand below the ES Cementer at 3787'. At 1300-hours and 3790', increase WOB to 8K-Ibs and increase circ rate to 10-BPM. At 1340-hours, P/U additional joint to continue drilling in harder cement with 8-10K-Ibs WOB at 10-BPM and 650-psi. At 1350-hours, break throuqh cement at 3924'. Drill dow"n a~ 2-BPM to 3944' which took 6' of sand off the top of the RBP sand cover. Circulate 20-Bbl Hi-Vis sweep, 12-BPM, 1100-psi. Monitor well, pump dry job, blowdown Top Drive and Kill Line. Prepare to POH and S/B DP and DCs in Derrick. POH and S/B DP and DCs in Derrick. Empty Boot Baskets and recover 3-gallons of fine debris with small chunks of aluminum and cement as well as 4 shear pins. PJSM. P/U and M/U the RCJB BHA: 7-7/8" RCJB with 8-1/2" Head, 3-ea Boot Baskets, 9-5/8" Casing Scraper, Bumper Sub, Pump-out sub, Oil Jars RIH with RCJB BHA from 235' to 3936' Break circulation and obtain parameters, Up wt = 108k, dn uvt = 100k, Rt uvt = 105k, 60 rpm, Torque 3k, 8 bpm, Cc~ 550 psi. Drop RCJB ball, pressure increased to 1660 psi with ball on seat. Wash down and tap sand ~ 3944' wash to 3956' C~3 8 bpm Circulate bottoms up C~ 8 bpm, 1660 psi, small amount of sand over shakers with bottoms up. POH with RCJB stand back DC's Lay down and empty RCJB and boot baskets. Recovered two small pieces of closing plug rubber and one piece of inetal approximately 3" long from RCJB. Six chunks of aluminum and sand recovered from boot baskets. Make up RCJB and boot baskets, Lay down 9-5/8" casing scraper. RIH with RCJB from 230' to 3081' RIH with second RCJB run. from 3081' to 3931'. Obtain parameters. up wt = 107k, Dn wt = 100k, Rt wt =105k, 40 rpm, Torque = 2.5k, 8 bpm, ~ 770 psi. Shut down pump, RIH tag sand ~ 3956', Pickup and drop ball, pressure increased from 770 psi to 1970 psi with ball on seat. Wash and ream from 3956' to 3976' Circulate bottoms up ~ 8 bpm, 1970 psi. small amount of sand across shakers at bottoms up. Monitor well.- well static. POH with RCJB BHA from 3976' to 230' Lay down 6-1/4" DC's, Jars, bumper sub, lay down RCJB and boot baskeYs. Recovered approximately 3 gal of sand mixed Printed: 9/1/2009 10:12:19 AM ~ • BP EXPLQRATION Page 8 of 12 Operations Summary R~port Legal Weil Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 'Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' ` o P ' Description of Operations From - To Haurs Task C de N T Phase Date 8/21/2009 02:30 - 03:30 1.00 CLEAN P CLEAN with fine metal shavings, and one piece of aluminum. ~I 03:30 - 04:00 0.50 CLEAN P CLEAN Clear and clean floor. 04:00 - 04:30 0.50 CLEAfV P CLEAN Aig up and test 9 5/8" casing to 3,500 psi for 30 minute record on chart. 04:30 - 06:00 1.50 CLEAN P CLEAN PJSM, covering picking up RBP retrieving tool. P/U RBP retrieving tool and RIH. 06:00 - 07:00 1.00 CLEAN P CLEAN Wash down over RBP at 3990 ; pump Hi-Vis sweep 11-BPM at 1070-psi. 07:00 - 07:30 0.50 CLEAN P CLEAN Get parameters: 97K-Ibs down and 95K-Ibs up. Latch up on RBP, set down 20K-Ibs, P/U 20K-Ibs over; increase set down and P/U wts to 25K-Ibs, 30K-Ibs, 35K-Ibs. RBP released at 35-38K-Ibs over string weight. 07:30 - 08:00 0.50 CLEAN P CLEAN Circulate bottoms up 10-BPM, 800-psi. 08:00 - 09:30 1.50 CLEAN P CLEAN POH and S/B DP in Derrick. B/O and UD RBP and RBP run pull tool. Called AOGCC with a 2-hours heads up. Jeff Jones, AOGCC inspector returned call at 0815-hours to waive the State's right to witness the weekly BOP test. 09:30 - 10:00 0.50 WHSUR P RUNCMP P/U wear ring run/pull tool, RIH and engage in wear ring, and POH and L/D wear ring. 10:00 - 10:30 0.50 WHSUR P RUNCMP P/U landing joint, M/U to the test plug, RIH and set it in the tubing spool. Prepare for weekly BOP test. 10:30 - 15:30 5.00 BOPSU P RUNCMP PJSM for BOP Testing; see "Remarks" section for PJSM discussion. PT BOPE to 250-psi low, 3500-psi high, using 2-7/8" and 4-1/2" test joints. Use only the 2-7/8" test joint in the Hydril. 15:30 - 16:30 1.00 BOPSU P RUNCMP R/D BOP test equipment and install wear ring. Rig up power tongs and change over to 2-7/8" handling equipment. 16:30 - 17:30 1.00 BOPSU P RUNCMP Inspect top drive and service rig. 17:30 - 22:00 4.50 BOPSU P RUNCMP Picku 3-5/8" clean out BH consisting of, 3-5/8" junk mill, bit sub, bumper sub,oil jar, xo, 110 jts 2-7/8" HT PAC DP, xo, circ sub, xo = 3501.22 22:00 - 00:00 2.00 BOPSU P RUNCMP Change over to 4" handling equipment, rig down power tongs. Makeup first stand of 4" DP and break circulation continue RIH with cfean out BHA from 3500' to 6,062' break circulation every 3,000' to ensure BHA is clear. 8/22/2009 00:00 - 00:30 0.50 CLEAN P CLEAN Perform Topdrive inspection, Test IBOP valve to 250 psi low, 3500 psi high for 5 min. record on chart. 00:30 - 03:30 3.00 CLEAN P CLEAN RIH with 3-5/8" clean out BHA from 6062' to 13,359'. Fill pipe and break circulation every 3,000' No problem going into 4-1/2" tubing stub ~ 13,263'. Obtain parameters, Pu wt = 218k, Dn wt = 125k, Rt wt = 167k, 20 rpm, torque 7K, 4 bpm, C~ 1800psi 03:30 - 04:30 1.00 CLEAN P CLEAN PJSM covering slip and cut operation. Cut drilling line. 04:30 - 05:00 0.50 CLEAN P CLEAN PJSM covering seawater displacement, prepare for displacement 05:00 - 08:00 3.00 CLEAN P CLEAN Displace well to clean seawater, Pump rate 5 bpm ~ 2,770 psi. Mix a 40-Bbl pill with 20-gallons Baroid EP Mud Lube and pump, followed by the last 200-Bbls of clean displacement seawater. The well turns horizontal at -14,400' then turns u-di 5-de rees at 15,250'. Perform TopDrive inspection. See "Remarks" for explanation of Top Drive inspection findings. 08:00 - 09:00 1.00 CLEAN P CLEAN P/U stand #105, get parameters: P/U wt 218K-Ibs, S/O wt 135K-Ibs, Rot wt 165K-Ibs, 40-RPM, free torque 9K-Ib-ft. RIH and tag at 50' in. P/U and start pumping at 4-BPM at 1400-psi, Printed: 9/1/2009 10:12:19 AM ~ • BP EXPLC?RAT~ON' Pag~ 9 of 12 ' Operations ~ummary Repart Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 Date Fram - To Hours Task Gode NPT Phase ' Description of Operations 8/22/2009 08:00 - 09:00 1.00 CLEAN P CLEAN 40-RPM, 7K-Ib-ft, 3-4K-Ibs WOB. Drill 1-foot and lose returns and WOB at 0900-hours. RIH to position DP to close Hydril around DP body and prepare to Bulihead 50-Bbls. Could not catch up to fluid at 4-BPM. Will use 60-BPH throuqh constant 09:00 - 09:30 0.50 CLEAN P 09:30 - 12:00 2.50 CLEAN P 12:00 - 22:00 I 10.00 I CLEAN I P 22:00 - 00:00 I 2.001 CLEAN I P 8/23/2009 00:00 - 01:30 1.50 CLEAN P 01:30 - 02:00 0.50 CLEAN P 02:00 - 02:30 0.50 CLEAN P 02:30 - 04:30 2.00 RUNCO 04:30 - 05:30 I 1.00 05:30 - 12:00 I 6.50 12:00 - 21:30 I 9.50 21:30 - 22:30 I 1.00 22:30 - 23:00 I 0.50 CLEAN Close Hydril bag and Bullhead 50-Bbls of seawater, 4-BPM at 1170-psi. CLEAN Open Hydril, P/U above the FasDril at 13,411' to verify that the BHA is free. RIH to push FasDril pluq remains to PBTD depth ~-16.678'. using constant hole fill of 60-BPH. Push remains to 16,645'. Prepare to POH and UD DP, 2-7/8" HT-PAC DP, and BHA. Losses for ast 12 hrs = 186 bbls CLEAN POH and UD all 4" HT-38 DP Joint #15 UD at 1215-hours. #45 UD at 1310-hours. #90 UD C~ 1400-hrs. #105 UD C~ 1430-hrs. #225 L/D C~ 1720-hrs. #337 UD @ 20:00-hrs. Lay down all 4" DP 414 jts. Fill hole through kill line pumping (~ 1 bpm. CLEAN Change over to 2-7/8" handling equipment, rig up power tongs and lay down 2-7/8" HT PAC DP from 3500' to 1674' Losses for last 12 hrs = 573 bbis CLEAN POH lay down remaining 2-7/8" HT PAC DP. CLEAN Lay down bumper sub, jars and junk mill CLEAN Clear and clean floor, lay down all Baker fishing tools and equipment. RUNCMP Pull wear ring. Rig up torque turn equipment, change over to long bails, Mobilize I-wire equipment and tools to floor, rig up I-wire spool and sheeve. RUNCMP PJSM covering running completion equipment. Run 4-1/2" tubing tail assembly, Baker-Loc connections below packer, Makeup NDPG pressure gauge connect I-wire and test connection and wire. RUNCMP Run 4-1/2" Com letion er drillers runnin tall . use Jet-Lube Seal Guard on all connections. Torque turn connections to optimum make up torque 4,440 fUlbs. Fill hole through kill line 60 bph. Joint # 25 RIH at 0800-hours. Test I-wire at joint #54 at 0940-hours. Test wire at joint #99. RIH with jt #100 at 1300-hours. Jt #120 at 1400-hrs. Losses for past 12 hrs = 606 bbls _ RUNCMP Run 4-1/2" Completion per running tally. Make up torque = 4,440 Wlbs. Use Jet lube Seal Guard on connections. Test I-wire eve 1,000', install Canon clamps every jt for the first 90 jts. then every other joint after 90 jts. Test wire at joint #99. RIH with jt #100 at 1300-hours. Jt #120 at 1400-hrs. Jt 3 195 C~ 1830-hrs. Jt # 225 C~ 2000-hrs. Jt # 254 ~ 2130-hrs. RUNCMP Mobilize Halliburton control line spool and equipment to rig floor, PJSM covering rigging up control line spool and sheeve. Rig up same. RUNCMP Make up control line to WeIlStar TRSV and test to 5,000 psi. Printed: 9/1/2009 10:12:19 AM ~ • BP EXPLORATION ~'~9~ ~~ ot ~~' Operati4ns Surnmary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' Date From - To Hc~urs Task Code N'PT Phase ' Descriptian Qf Qperations 8/23/2009 22:30 - 23:00 0.50 RUNCO RUNCMP Good test. 23:00 - 00:00 1.00 RUNCO DFAL RUNCMP t i-wir Meter indicates an o en circuit, chan e out computer, cables and test cable to I-wire spool, unable to get test still showin o en circuit. Losses for ast 12-hrs = 596 bbls 8/24/2009 00:00 - 01:30 1.50 RUNCO DFAL RUNCMP (Contact operations engineer and discussed I-Wire problem.) Schlumberger Technician traveled to shop in Deadhorse to get TDR meter (Time Domain Reflector). Connect meter to I-wire cable, meter indicated an anomaly at or just above the gauge at 10916'.which could explain an open circuit. Decision was mad t ` 01:30 - 05:00 3.50 RUNCO RUNCMP Run 4-1/2" completion, set down 8K ~ 11749', picked up 5', Up wt = 185k, Dn wt =i 15k saw nothing going back down, continue running 4-1/2" tubing. to 13,180'. 05:00 - 07:30 2.50 RUNCO RUNCMP Make up 5-ea space out pups = 35.53' Make up joints #305 and #306 space out. Work overshot over tubing stub ~ 13,265', did not see either sets of shear pins while working over stub. Set down 20k, 6' from No-Go. Pickup several times, rotate string 3/4 turn at a time to attempt to get over stub. Made approximately 5' to within 1' of calculated no-go. Called ADW Engineer and Sperintendent to discuss Plan Forward. Decided to R/U slickline to RIH with gage-ring to verify that we have swallowed the stub. Continued filling back side ~ 60-bph during this operation. With overshot over stub, started getting returns. Set back down to ensure 20K-Ibs down, then 5-footed out to approximately 12' and fluid started dropping on back side. Call ADW engineer to discuss option of the Slickline ga e-ring run, and decide to continue on with slickline operations. install TIW valve on top of landing joint. Ran 203 Full Cannon Clamps, 13 Half Clamps, and 1 SS Band. 07:30 - 10:30 3.00 RUNCO RUNCMP M/U TRSV Control Line and Schlumberger NDPG Sensor line to Hanger and test voids for both--solid tests to 5,000-psi. Pull enough TRSV control line to wrap around top of hanger. Install needle valve on end of control line. Tie off line to upper neck of the hanger and pressure up line to 5,100-psi to hold the TRSV flapper valve in the open postion. Hold for 10-minutes to watch for bleed-off. Solid test. Close valve on line, bleed off fill line and remove. M/U pull back line to landing joint to center the hanger. Slowly RIH to set hanger in tubing spool. R/D I-wire spool and equipment and send out on Beavalator. RILDS at 1000-hours. Break-out and UD landing joint. Keep hole fill on at 60-BPH. 10:30 - 12:30 2.00 RUNCO DPRB RUNCMP Wait on Schlumberger Slickline crew to make Gage Ring run to ensure that the Unique Machine Overshot and shear-pin sub have swallowed the 4-1/2" tubing stub at 13,265'. 12:30 - 15:00 2.50 RUNCO RUNCMP PJSM to R/U Schlumberger slickline equipment--see "Remarks" section. R/U Schlumberger slickline equipment. PT Lubricator and BOP to 500-psi. 15:00 - 17:30 2.50 RUNCO RUNCMP RIH with 3.805" Ga e Rin to 'ust above the RHC-M lu ~ 13,227' ,Slick line depth 13,238' POH with gage ring. 17:30 - 20:00 2.50 EVAL N RUNCMP RIH with GS retrievin tool to ull RHC lu in x Ni le ~ Printed: 9/1/2009 10:12:19 AM ~ . BP EXPLC}R~4TI~N Page 11 af 12 Operatians Summary Repa;rt Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' Date Fram - Ta Hours Task Ctrd~ NPT Phase '' Description of Operations 8/24/2009 17:30 - 20:00 2.50 EVAL N RUNCMP 13 227', En a e lu C~3 13,240' Slick line measurement. and POH with lu . Continue fillin hole throu h kill line ~ 60 b h. 20:00 - 23:00 3.00 EVAL N RUNCMP Make up 3.77" swage and RIH to ensure wire line tools will pass through overshot and tubing stub ~ 13,265'. Set down C~ 13 300' wire line measurement. X Ni le C~3 13 303' P H' Swa e. 23:00 - 00:00 1.00 EVAL N RUNCMP Make up 3.5" swage, RIH to ensure pass through X nipple C 13,303'. 8/25/2009 00:00 - 01:00 1.00 EVAL N RUNCMP RIH with 3.5" swaqe to 13,400' POH with swaqe. 01:00 - 04:30 3.50 EVAL N RUNCMP RIH with RHC-M plug and install in X Nipple C~? 13,227' unable to set RHC-M plug POH with Plug. Once at surface, no visible sign of tool failure. 04:30 - 05:30 1.00 EVAL N RUNCMP Disassemble setting tool and RHC-M plug, finding the spring locks that activate the keys that locate plug in the profile would not engage. Replaced seals and o-rings on plug. Replace springs and function tool at surface, tool functioned properly. 05:30 - 08:00 2.50 EVAL N RUNCMP RIH with RHC-M plug to 13,240 ; P/U to set in X-nipple; S/O to tap down to leave plug in place and plug did not set. Welis support lead onsite recommended that the running tool be replaced along with a full checkover or replacement of the RHC-M plug. 08:00 - 10:00 2.00 EVAL N RUNCMP POH with RHC-M plug. Release the dirty vac and one seawater truck. Keep the two vac trucks with corrosion inhibited seawater. 10:00 - 13:30 3.50 EVAL N RUNCMP RIH with new X-line running tool and RHC-M plug. Get past the X-nipple and pull up to set in profile. Won't engage so decide to stop hole-fill. Pull up into X-nipple and set RHC-M lu . 13:30 - 14:30 1.00 EVAL N RUNCMP POH to P/U a Check-set tool to RIH and verify solid set for the RHC-M plug. 14:30 - 16:30 2.00 EVAL N RUNCMP M/U Check-set tool BHA: 4.5" Check-set Tool, Spang Jars, Oil Jars, Roller Stem and RIH to check that the RHC-M plug is fully set in the X-nipple at 13,227'. At 1630-hours, Schlumberger operator momentarily let his eyes stray from the spool as the Check-set tool was passing through the GLM installed at 9156'. The Check-set tool stacked out inside the GLM and -200' of wire spooled out onto the ground and bird-nested around the spool. Driller S/D operations, Schlumberger secured the slickline with a wireline clamp at the rig floor. ADW Superintendent and RWO engineer and the ADW Drilling HSE Advisor were contacted. 16:30 - 19:30 3.00 EVAL N HMAN RUNCMP Schlumberger HSE Advisor conducted Hazard Risk Assessment with Doyon 16 Driller before proceeding to unravel the bird-nested spool. Once the spool is sorted out the Check-set tool will be POH to check out all components of the BHA. Slickline was inspected and found to be damaged and will be changed out. 19:30 - 20:00 0.50 EVAL N HMAN RUNCMP Rig Down Schlumberger Lubricator and Slickline truck. 20:00 - 21:30 1.50 EVAL N HMAN RUNCMP Wait on Replacement Sfickiine Truck and Spot up to Rig. 21:30 - 23:00 1.50 EVAL N HMAN RUNCMP PJSM with Rig Crew and Schlumberger Slickline Crew, BP WSL and BP PE -RU Lubricator and Pick up Check-set tool BHA: 4.5" Check-set Tool, Spang Jars, Oil Jars, Roller Stem. Printed: 9/7/2009 10:12:19 AM ~ • BP EXPLQRAT~ON' Page 12 of 12 Operations Surnmary Report Legal Well Name: NK-38 Common Well Name: NK-38A Spud Date: 1/1/1995 Event Name: WORKOVER Start: 8/18/2009 End: Contractor Name: DOYON Rig Release: 8/27/2009 Rig Name: DOYON 16 Rig Number: 16 ' Date From - Tca Hours Task Code NPT Phase Description of Uperations 8/25/2009 23:00 - 00:00 1.00 EVAL N HMAN RUNCMP RIH to 9,156'. 8/26/2009 00:00 - 02:00 2.00 EVAL N HMAN RUNCMP Continue RIH to 13,226' with Check-set tool -Inspect Check-set tool for latch, positive indication of latch up. 02:00 - 03:00 1.00 EVAL N HMAN RUNCMP R/D Slickline unit, Lubricator, and Dutch System Extension. Excessive Non-planned Time {NPT) due to the unspooling incident is from 1630-hrs, Aug 24th to 0300-hrs, Aug 25th or 10.5-hrs. 03:00 - 03:30 0.50 RUNCO P RUNCMP Rig up to Circulate Corrosion Inhibited Seawater -PJSM with CH2MHill Truck Drivers and DDI Rig Crew. 03:30 - 08:00 4.50 RUNCO RUNCMP Pump Corrosion Inhibited Seawater: -Pump 100-Bbls of heated (110-deg F) Clean Seawater, followed by 560-Bbls of Heated Corrosion Inhibited Seawater. -EC-1124A Corrosion Inhibitor at 25-gal/100-Bbls concentration. -3-BPM / 250-psi. 08:00 - 10:30 2.50 RUNCO RUNCMP Dro 1-7/8" Ball/Rod. 0815-hrs ressure u on tubin to 3500-osi and hold for 30-minutes. recorded on chart. for a solid and hold for 30-minutes recorded on chart, 'u ti ht. Bleed off tubing and DCR valve shears at -1500-psi. Pump through DCR valve both ways for 5-BPM, each. R/D circulating line and back out landing joint. 10:30 - 12:30 2.00 WHSUR P WHDTRE FMC P/U TWC and d-rod into han er. Test to 3500- si from above and 1000- si from below. 12:30 - 17:00 4.50 BOPSU P WHDTRE P tack. Remove turnbuckles from top of BOP stack. Remove pipe rams and blind rams and clean inside. Break connections on stack for dismantling in rig shop. Continue N/D stack and set back on stump. Tested TRSSSV to 1500-psi for 15-minutes. 17:00 - 18:30 1.50 WHSUR P WHDTRE N/U Adaptor and 4 1/16 5M tree 18:30 - 19:30 1.00 WHSUR P WHDTRE Test Adaptor Flange to 5000 psi for 30 minutes, Good Test -Test Tree to 5000 psi with Diesel for 5 minutes, Good Test 19:30 - 20:30 1.00 WHSUR P WHDTRE PJSM with Little Red and DDI Rig crews on Freeze Protecting Well -Test line from LRS to Flow manifold to 3500 psi (good test) 20:30 - 21:00 0.50 WHSUR N WAIT WHDTRE Wait on Drill Site Maintenance to arrive on location 21:00 - 21:30 0.50 WHSUR P WHDTRE si ood test Pull TWC 21:30 - 22:00 0.50 WHSUR P WHDTRE Rig up pump in cap and lines to top of tree -Test to 3500 psi, Good Test 22:00 - 23:30 1.50 WHSUR P WHDTRE Reverse Circulate 150 bbls of Diesel to freeze protect top 2200 feet of hole -LRS pump at 2 bpm / 200 psi / 100f deg 23:30 - 00:00 0.50 WHSUR P WHDTRE U-Tube Diesel to tubing 8/27/2009 00:00 - 00:30 0.50 WHSUR P WHDTRE Complete U-Tubing Diesel Freeze Protect , 00:30 - 01:30 1.00 WHSUR P WHDTRE Set BPV and test from below with LRS to 500 psi for 5 min, ood test -Bleed down lines, Suck back Diesel from Lines, RD DSM 01:30 - 03:00 1.50 WHSUR P WHDTRE Secure Well -Blow Down Line -Ready Rig to Move Off ', "Release Rig at 03:00 hrs" Printed: 9/1/2009 10:12:19 AM TRE~=~ ~V LHEAD = ACTUATOR = BAKER KB. ELEV _ 48.20' BF. ELtV - 2~' KOP = 9163' Max Angle = 95 @ 15265' Datum MD = 14196' Datum TVD = 9850' SS ~ement 3787` to Surface (8/20/09) 15/7# ARCTIC SET CEMENT (6/7/05) 4000' -4540' 13-3/8" CSG, 68/72#, NT-80, ID = 12.347" 4544~ Minimum ID = 3.725" @ 13368' 4-1/2" HES XN NIPPLE TOP OF 7" LNR 9003' 9020~ 9-5/8" X 7" BKR FLIX-LOCK LNR HGR, ID = 6.330" MILLOUT WINDOW (NK-38A) 9163' - 9179' WHIPSTOCK (02/11/05) ~-{ 9163~ EZSV (02/10/05) PERFOfZ4TION SUMMARY REF LOG: MWD GR ON 01/03/05 ANGLE AT TOP PERF: 90° @ 15504' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 15504 - 15743 O 03/13/05 2-1/2" 6 15793 - 16396 O 03/13/05 2-1/2" 6 16446 - 16556 O 03/13/05 2-1/2" 6 16576 - 16676 O 03/13/05 9-5/8" CSG, 47#, NT-80S, ID = 8.681" ~6060' ~4-1/2" TBG, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" ~ ~ 7" LNR, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" ~ 1/2" LNR, 11.6#, L-80, LTC, .0152 bpf, ID = 3.958" ~~ 16763~ DATE REV BY COMMENTS DATE REV BY COMMENTS 03/01/95 ORIG COMPLETION, (POOL 7) 06/26/08 DTR/PJC GLV GO (06/11/08) 03/16/05 N9ES NK-38A SIDETRACK "A" 06/02/09 MEF/TLH GLV C/O (05/17/09) 07/16/05 RWL/PJC GLV GO 01/15/07 CS/PJC DRLGDRAFTCORRECTIONS 07/24/07 TA/SV GLV GO 11/19/07 RLW/PJC PERFSIZECORRECTIONS ~ 3303' I-1~-~t2~~ ~~s x r~~P, ~~ = s.a~ ~~~ ~ 1~324~ 7" X 4-1l2" BKR S-3 P4CR, ID = 3.875" 13348' a-~~2~~ H~sx~viP, ~~=~.s~~~~ 13368~ ~4-1/2" HES XN NIP, ID = 3.725" ~ 13372~ 7" X 5" BKR "HRD" ZXP LTP, ID = 5.00" 13381~ 4-1/2" WLEG, ID=3.958" 13394~ 7" X 5" DG FLIX-LOCK HGR, ID = 4.430" \ 13404~ 5" x 4-1 /2" XO, ID = 3.940" ~~ I--I 16678' NIAKUK UNff WELL: NK-38A ' PERMff No: 2042410 API No: 50-029-22540-01 SEC 36, T12N, R15E, 2268.66' FEL & 911.26' FNL BP 6cploration (Alaska) 4-1/16" CNV S OTES: **"'WELL ANGLE> 70° @ 13990' & 13-5/8" FMC N K~~ ~~~'~~~~ ~""'~"'~~~~ GOES IZONTAL @ 14608'*" - 2,21'I ` 4-1f2" }-iES TRSSSV W~~LSTAR> IL~-3.813° 3,787` - 9-5f8", 47#, ~-8Cf Fiyd-563 3,787` 9-5/$", H-ES Cernellfer 3,$49`- 9-518° ECP __,.____ ~~,ti3t)` ~ y-t~,itts~~ c~~;~ r~ficn ~ Gas t~ift Mar~c~~efs ST MD TVD Size ~S 3002 2999 4-112" x 1-112" 5 4928 45t~2 4-1I2" x 1-112" 4 6812 55~9 4-1/2" x 1-112" ` 3 9156 65C38 4-1{2° x~ 2 1~787 7503 4-112" x 1 9 12126 8512 A-112" x 1 ~~- a_~'z^ eKR ~~rP i Te m= F~sn^ '~ J~', ~~1~` HES 4-1/2.: ,.X" Nipple, ID=3.813" ~~, 7~1~.` BKR 7` x 4-1,'2' S-3 , 9GR PKR '~ ~,~~7` HES 4-1;2" `X" Nipple, ID=3,813" 13,258` a-~~~°z ~2.s#, ~~ca, i~=s,~~a,~ ~~,~5~` 9-5t8` x 4-1/2" 9CR Uniq~e flvershof • • ~ - ~. ~ ~ ~ °w ~"°: ~ ~ ~ ~ ~ 'f~~ f ,r ~ ~ ~~ ~~~? ~" ~ ~ : ~ ° O~~e r ~ ~ ~ r `~~ !~ ~~~ ~ ~y~, ~ SARAH PALIN, GOVERNOR ~ ° , ; " ~~ ~ ~ t d ~. ~ ~ '~~ ~ ~ ~ ;. s f ~ ~ t~. r_ `~ ~~ ha! tT =~ ;.a_r rs $~~ ~ >~ ? "4 @~ R ~ ~ ~ ~S~~A 0 ~~~ ~5 ~"~ 333 W. 7thAVENUE, SUITE 100 COI~TSERQA 01s CO SS ANCHORAGE,ALASKA 99501-3539 ,~ PHONE (907) 279-1433 F FAX (907) 276-7542 Mr. David Reem Engineering Team Leader BP Exploration (Alaska),Inc. :.~ , ~ ~ s ,, ~~~~`~ ~ ~ P.O. Box 196612 .~ -~' ~ ~~`~ ~"~` ~ ~~ ~' ~~ ~' ~ Anchorage, AK 99519-6612 a,~ ~ Re: Prudhoe Bay Field, Undefined Ivishak - Sag River, PBU NK-38A Sundry Number: 309-250 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~ Chair h DATED thi~ 3 day of July, 2009 Encl. STATE OF ALASKA ~~~~ I e~ ~~~,/~~' ~ ALA~ OIL AND GAS CONSERVATION COM ION ~~L 2~~~Q~ ~-~ APPLICATION FOR SUNDRY APP~VA ~'I~~ 20 AAC 25.280 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extens~~~f~aC~~~ _~ Alter Casing _~ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program -~ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. .~ Development ^ Exploratory 204-241 ~ 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22540-01-00- 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU NK-38A - Spacing Exception Required? ^ Yes ~ No 9. Property Designation: 10. KB Elevation (ft): 11. Field / Pool(s): ADL 034630 ~ 48.4' - Prudhoe Bay Field / Undefined Ivishak - Sag River 12~ PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 16765 ~ 9923 - 16678 - 9915 ' None None C sin Len h Size MD TVD Burs II Structural r " ' 1 3 2 S rf 4504' 13-3/8" 4 4213' 502 2270 In rmediate 16023' 9- /" 9163' 1' 6870 4760 Pr i n Liner 4531' 7" 90 3' - 1 34' 1' - 9598' 7240 5410 Liner 3391' 4-1/2" 13372' - 16763' 9482' - 9923' 8430 75 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 15504' - 16676' 9907' - 9915' 4-1/2", 12.6# L-80 13381' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 13324' 13. Attachments: 14. Well Class after proposed work: ~ Description Summary of Proposal ^ BOP Sketch ' ^ Exploratory ~ Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: August 1, 2009 _~ Oil ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: ^~NAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mehrdad Nadem, 564-5941 Printed Na avid Reem Title Engineering Team Leader Prepared By NameMumber. Signature ~ Phone 564-5743 Date '7 ~~ Terrie Hubble, 564-4628 Commission Use Onl Sundry Number: 5'~ Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ~ BOP Test ~Mechanical Integrity Test ^ Location Clearance Other: ~S~O ~S ~ 1'f~.v-1 '~ "~"~ ~~~~ ~g~~ v~-~~+^ 1 r'~J'~'~ CL~ i~~J ~~'~`~"'~ Subsequent Form Required: ~~~ APPROVED BY Z / ~~ ~ A roved B: COMMISSIONER THE COMMISSION Date Form 10-403 Rev~d (~6/2006 / Submit In Duplicate oR~~iNA~ ~~,~~~~~~~~~Q9 • ~ ~ ~P N K-38A Well Type: Producer • Current Status: This well is currently shut-in due to IA x OA communication. Scope of Work: Repair IA x OA communication by cutting and pulling 9-5/8" surface casing, replacing it with a new string of 9-5/8", 47#, Hydrill 563, and fully cementing it to surface. Pull 4-1/2" tubing and replace with 4-1/2" 12.6#, 13CR completion tubing. MASP: 2,522 psi Estimated Start Date: Production Engineer: Intervention Engineer: Pre-riq prep work: August 2009 Bob Gerik Mehrdad Nadem S 1 Drift tubing for FasDrill. Set FasDrill at ~13,410' MD (reference tubing tally dated 3/2/2005). Pull dumm valve on GLM station #4. F 2 CMIT- T x IA to 3,500 si. MIT-OA to 2,000 si. E 3 Power jet cut the 4-1/2" L-80 tubing at ~13,270' MD in the upper 10' of the first full joint. Reference tubin taA dated 3/11l2005 F 4 Circulate well with seawater. FP with diesel throu h the cut. F 5 CMIT T x IA to 1,000 si for 10 minutes. This confirms the FasDrill remains a com etent barrier. W 6 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breaka e check one at a time . PPPOT-T & IC. V 7 Set a BPV in the tubin han er. Secure well. O 8 Remove the wellhouse & flow line. Level the ad as needed for the ri . Proaosed Procedure: 1. MIRU workover rig Doyon 14. ND tree. NU BOPE and test to 3500 psi/250 psi low. Circulate out freeze protection fluid and circulate well to clean seawater through the cut. 2. Pull and LD 4-1/2", 12.6#, L-80 tubing string down to the cut. 3. Run 9-5/8" casing scraper to the tubing stub. 4. RU E-line, run USIT in 9-5/8" casing from the tubing stub to surface in cement and corrosion detection mode. 5. Set retrievable bridge plug 100' below the top of cement and pressure test to 3,500 psi for 10 min. 6. Cut and Pull 9-5/8" 47#, NT-80S surface casing. Note: Pipe rams will not be changed to 9-S/a" as the well has two tested barriers (FasDrill plug and RBP) to the reservoir. 7. Run and fully cement new 9-5/8" L-80 47# Hydril 563 casing with ECP, ES Cementer and casing patch to surface. 8. Drill out the ES cementer assembly. 9. Pressure test 9-5/8" casing to 3,500psi for 30 minutes. 10. Retrieve bridge plug. • • 11. Drill out FasDrill and push it to the bottom of the wellbore. 12. Run 4-'/2" 12.6#, 13Cr-80 completion with Baker S-3 packer with I-wire. 13. Displace the IA to packer fluid and set the packer. 14. Test tubing and IA to 3500 psi. Freeze protect to 2000' TVD. 15. Set BPV. ND BOPE. NU and test tree. RDMO. ATTACH: Current and proposed Schematics TREEL 4-1/16" CMI tNELLHEAD = 13-5/8" FMC ACTUATOR= ~KB ELEV~ ~ ~ BAKER ~ 48.20' BF. ELEV - 2~' KOP - ._ __ .,_~~, ~ v Max Angle = 9163' _~ ,,__~ m .w...,...v . 95 @ 15265' Datum MD = 14196' DatumTVD= 9850'SS ~ NK-38A 13-3/8" CSG, 68/72#, NT-80, ID = 12.347" 45¢Q' Minimum ID = 3.725" @ 13368' 4-1l2" HES XN NIPPLE TOP OF 7" LNR -~ 900: S~OTES: *"'WELL ANGLE> 70° @ 13990' 8~ GO RtZONTAL @ 14608'*" 2115, I-14-1/2" WElL STAR TRSV, ID = 3.813" 4~I~~~ - 454~~ 15l7# ARCTIC SET CEJNENT (O6lOi GAS LIFT MANDR~S ST NID TV D DEV ?Y PE V LV LATCH PORT DATE 6 3033 2999 23 MMG DMY RK 0 03/15/OS 5 4924 4502 41 MMG DOM RK 16 O6/11/08 4 6805 5509 65 MMG DMY RK 0 03/15/05 3 9158 6508 64 KBG-2 *DMY BK 0 07/16l05 2 10794 7503 43 KBG-2 SO BK 22 O6/11/08 1 12132 8512 37 KBG-2 DMY BK 0 03/15/05 'S IA #4 = uMY HAS tX I tNDtL7 I'AC:KINCi 9003' 9-5/8" X 7" BKR ZXP LTP, ID = 6.330" 9020~ 9-5/8" X 7" BKR FLDC-LOCK LNR HGR, ID = 6.330" MILLOUT WINDOW (NK-38A) 9163' - 9179' WHIPSTOCK (02/11/05) ~ 9163~ 13303~ 4-1/2" HES X N~, ID = 3.813" ° ~. ~ FZSV (02/10/05) 9205' ~ ~ 13324' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" ,~ ~~~ _~;, .., ~~,. >~ s:,. 13348' 4-1l2" HES X NIP, ID = 3.813" PERFORATION SUMMARY REF LOG: M1ND GR ON 01/03/05 ANGLEATTOPPERF: 90° @ 15504' Note: Refer to Roduction DB for historical perf data SQE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 15504 - 15743 O 03/13/05 2-1/2" 6 15793 - 16396 O 03/13/05 2-1/2" 6 16446- 16556 O 03/13/05 2-1/2" 6 16576 - 16676 O 03/13/05 9-5/8" CSG, 47#, NT-80S, ID = 8.681" 16060~ ~4-1/2" TBG, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" ~ 7" LNR, 26#, L-80, BTGM, .0383 bpf, ID = 6.276" ~ 13534~ 4-1/2" LNR, 11.6#, L-80, LTC, .0152 bpf, ID = 3.958" -~ DATE REV BY COMMBJTS DATE REV BY CAMMENTS 03/01195 ORIG COMPLETION, (POOL 7) O6/26/08 DTR/PJC GLV GO (O6/11/O8) 03/16/OS N9ES NK-38ASIDETRACK"A" 07/16/OS RWL/PJC GLV GO 01/15/07 CS/PJC DRLGDRAFTCORRECTIONS 07/24t07 TA/SV GLV GO 11/19/07 RLWlPJC PERF SQE CORRECTIONS 13368~ ~-~4-1/2" HES XN NIP, ID = 3.725" 2~~ 7" X 5" BKR "HRD" ZXP LTP, I ID = 5.00" 381' 4-1/2" WLEG, ~ = 3.958" 13394~ 7" X 5" DG FLIX-LOCK HGR, ID = 4.430" 13404' S° x a-~iz° xo, ID = 3.940" ~TD ~-~ 16678' NIAKUK UNff WELL: NK-38A PERMIT No: F2042410 A PI No: 50-029-22540-01 SEC 36, T12N, R15E, 2268.66' F~ & 911.26' FNL BP Exploration (Alaska) TREE~ IJUa HB4D- R~T1.U4fi0R- ~K6. ~LE'~! - ' B F. a BJ - 440 P - l ubx A ~g~e - Dad~G= Dad m TVD - Hi~tS' Cuu ~ 3~5,~ FIUC ~~-~~ ~ r~ ~~~ ~ SR MiDTES:"**V~ELLANGLE> 70° ~13884' ~ G0~0 RI~ OMTA L~'I ~1648' ** BA K~! 15~?ip RRCTIG ~ET ~ Ei~ ENT ~R A5) - 13-3~' C~G_ ~I72~p_ NT~30_ D~ 12317' Minimum ID = ~.7Z5" ~ 13368' 4-1~2" HES }~N MPPLE ~2A' 36dS ?C 7' 8143 F LEX-IACK L NR FiG R. D- 6.3~' IaL L1_i UTU1J 1'IdODU ( N Krw°8 A) 91 x~' - 91 P9' PERPD PATd N SUTA1~4 R'f REF LAG:II~fUDGR ON~1~J05 A NG LE RT'!~D P PERF: 90' ~ 195~~' tb~: Re?er~Ga Prod~alb~ DB riar i tbfY;alperf ~1a S~E SPF I RdA~L 4pY~9qi G4TE -ifl' S 1550 ~4 - 1S7 43 0 ~3~13A5 2-iF1' b 15793- 16;~16 0 ~7I13A5 2-ill' 6 16~~~6- 16~56 ~D 0~113A5 2-12' 6 16575- 166t5 0 ~3113A5 9-Ex~' C~G. ~7iM. NT~S. IU- 8bB1' 16Q64' ~4-1fT LNIi, 11 AA, L~iAJ. l Il:, L1~tD~Jf. U• JJ~- ~ 12' HES~ NP, ID~ 3,813 ~ 7C~-1J~ 91Q~~~ PI~t. D-3~3~5' 4-1f~' NE~~NNIP. D-3.725' I7' SCS' BI~'HRD" ZKP LTP, I ID - S.m' J2' ~IU LBG, D- 3~SS' I 7' X 5' DG F LEK-lA~ K FiG R~ D - t.~3~' 134~t' HS x 4-1f~' 79Q, ~ ~D-39~10' Nw ~au~ uMrr ~ WELL: NF43$~k PERIAIf -b: ~13L10 PtPI No: 50~~~2510-01 ~~ 36 , Tt2 N, R 15 ~ 2253 AG' fEl & 91 1.26' F NL 6P Ecp~oration (A~a~N s) ~ ~' -~412" HES TRSSS`J~IEILSTfiR. IQ~~.813.' ~;~~a~ --- ~ ~a°. ~*. ~-sa ~r~-~ 2,354' "" 9-518" E C P 2,~75' - 9-5/~' C S~ Patch I';~ 1 ~f h~lanr~r~i~ 5~T A+IG T',~D J~ t3 :3Q~~ 1~~+ 4-1,1" :~ 1- 't~" 5 ~1~ 4FC~ 41i~" ;: ~1• 1~" ~} B$U5 ~42 4 9{~° x 1- 9J~" ~ 9158 65~ 4•l~`,~ x 1 ~ i Ci?94 ~!5~~ ~-1t~" :: 9 1 1<~~1L {~ 9~ 41IZ" :~ 1 X 7' 814~Z~CP LTP, Id~ 5.33Q ~1 ? 140' H~; ~~rr•~ r~ppk, IC~-3.813 tii~ B14i 7' x Ir112 S-~ ,$CR PFQ{ ~ '~ ~ ~(~ ~~ HGS ~i!'2 "x' N~pi~. IG-3.8f3' ~~ 41t:", 12.dk, 1~~~t. 1~3.af,$., ''7 9$~3 ,~ IrilZ' 9CR U~Iq~e t7ue~alot ~ :~ ~~ o' (- .. os/1 a/oa Scb~u~berger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A7TN: Beth wou _~,.ti ~ N0.4887 Company: State of Alaska x ~ ~~~~ ~~ ~ ~ r,a ~ ~ Alaska Oil & Gas Cons Comm 13t ~,~~ Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ ~~ ~_ M-04 11978480 MEM GRADIOMANOMETER LOG ~ ~~ 08/25/08 1 1 14-32 12031498 LDL 07/29/08 1 1 H-20 11962621 USIT "'~j- ~- LJ 08/28/08 1 1 3-35/L-36 11999039 INJECTION PROFILE ~ pg/04/08 1 1 3-37/L-35 11970845 FLUID LEVEL DETERMINATION V X51 09/07/08 1 1 3-37/L-35 11868960 PRODUCTION PROFILE 08/30/08 1 1 NK-38A 12017515 SBHP SURVEY ~ _ ~ 09/02/08 1 1 L-215 12031512 INJECTION PROFILE 3 Lj' _. ~ 09/03/08 1 1 B-05B 12096914 MCNL 08/17/08 1 1 L-205L3 40016965 OH MWD/LWD EDIT 06/21/08 2 1 • ---~- v..,~a e~,.. r. ~rn~~P~aa w~c a.vr~ cha.n ~v: BP Exploration (Alaska) Ina ,,ter , ~ r~.,~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. r,t-[~ ~ Anchorage, Alaska 99508 ~~`k[-R ~~ C( ~~}(1~~ Date Delivered: .y ,1i f , ~r , ;',: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 8 ATTN: Beth Received by: i~.i • • • -• ~ a3~o~ zoos • rb. ~-:"_~+ DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:1I.aserFichelCvrPgs_InsettsVVJGcmfinfi m Mark~r.~c NK-38 (PTD #2042410) Internal Waiver Cancellation - Nonnal Well . . All, An internal waiver was issued for IAxOA communication on well NK-38 (PTO #2042410) on 06/17/05. The well passed an MITIA on 04/08/07 proving two comepentent barriers. Under the new WI System Policy set to take effect on June 1, 2007, well NK-38 will be Operable. ~- The well is reclassified as a Normal well. Please remove all waivered well signs and the lamintaed copy of the waiver from the wellhouse. Thank you - Jack L. Winslow (for Andrea Hughes) Well Integrity Engineer office - 659-5102 pager-659-5100,1154 6~N~ jUN 2, 5 2007 ... 1 of 1 6/12/20073:58 PM ) b ~ t'\d DATA SUBMITTAL COMPLIANCE REPORT 4/11/2007 Permit to Drill 2042410 Well Name/No. PRUDHOE BAY UN NIA NK-38A Operator BP EXPLORATION (ALASKA) INC '>f~ I). 6_Ù~ S- API No. 50-029-22540-01-00 MD 16765'- TVD 9923 Completion Date 3/16/2005 Completion Status 1-01L ~~-~~ REQUIRED INFORMATION Mud Log No Samples No ~-_._-_..~~...._----_._~-_.._-~---~-...-.~".~--.-'.------~------~--~~ ---.--~-_._-~-_._--~--.,....------..------~~. Current Status 1-01L UIC N ------~ _..,~-~--- -~-~---- Directional Survey Yes -~~---"'-~-~~~~'-""--'--~--~-"---'--"--~'-'-'------ DATA INFORMATION Types Electric or Other Logs Run: DIR / GR / RES, DIR / GR / RES / NEU, DIR / GR / RES / NEU / ABI, Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Tïpe Med/Frmt Number Name Scale Media No ~-----OÞ.SC-- Directional Survey ~---~- I ItRpt Directional Survey ~D D Asc Directional Survey -Rpt Directional Survey t-t6{ Production 2 Blu I r Formation l\Aier9 11:92 Ì(\'f-I..V" Col rg 14497 1 nd u ction/Resistivity 25 Blu 4'^\) fOg 14497 I nd uction/Resistivity 25 Blu 1 v'/') t: 14497 I nd uction/Resistivity 25 Blu tA~· JÆ6 C ~..15 14497 I nd uction/Resistivity ~g 14498 Induction/Resistivity 2 Blu f'1 t':3 I I tí°g 14498 Induction/Resistivity 2 Blu ìVb tl,ED C ~ hi) 14498 Induction/Resistivity l~~___~._~.._.._~_.~_ (data taken from Logs Portion of Master Well Data Maint Interval OH/ e Start Stop CH Received Comments - 0 16765 Open 5/27/2005 0 16765 Open 5/27/2005 0 14189 Open 5/27/2005 PB 1 0 14189 Open 5/27/2005 PB 1 13380 16677 12/20/2005 MEMORY PRODUCTION PROFILE w/GHOST MEMORY PSP I GRlCCL ?PRESSfTEMP/SP IN/GHOST j 13553 14133 6/8/2006 Mod Formation Dynamic I Tester, Drill Pipe Conveyed 27-Feb-2005 8850 16765 Open 2/20/2007 MD Vision Service 11-Mar- I 2005 - I 8850 16765 Open 2/20/2007 TVD Vision Service 11-Mar-¡ 2005 13536 16765 Open 2/20/2007 MD Vision Service BHP 11- Mar-2005 9163 16764 Open 2/20/2007 FET, ROP, GR, DRHO, NPHI w/Graphics 9163 14189 Open 2/20/2007 PB1 MD Vision Service 26- i Feb-2007 I I 9163 14189 Open 2/20/2007 PB1 TVD Vision Service I 26-Feb-2007 I 9163 14195 Open 2/20/2007 PB1 FET, ROP, GR, I -- DRHO, NPHI w/Graphics J DATA SUBMITTAL COMPLIANCE REPORT 4/11/2007 PermittoDrill 2042410 Well Name/No. PRUDHOE BAY UN NIA NK-38A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22540-01-00 MD 16765 Completion Date 3/16/2005 Completion Status 1-01L TVD 9923 Well Cores/Samples Information: Name Interval Start Stop Received Sent ADDITIONAL INFORMA):lON Well Cored? Y k.ù Chips Received? Y'7f;r- Daily History Received? Formation Tops Analysis Received? ~ -~----- ~-~~-~-- --~~~~-~-- Comments: ===------=----=====--=----==----==-=---~-=--~-~,---=--~~-- Compliance Reviewed BY:__~~__~ -,.~ --, Current Status 1-01L Sample Set Number Comments ~N &N UIC N e ~--~~~~~XJìp-~7--= - 02/12/2007 Schlumberger NO. 4131 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage. AK 99503-2838 ATTN: Beth c9ó4 -aLl I ::Jf 14L{ C) "1 ;tt I 4L/0~ Field: Prudhoe Bay Company: State of Alaska Alaska Oil & Gas Cons Comm Altn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 WII D t CI CD J L D BL e ob # og escription ae oor L5-25 11538589 LDL 12/28/06 1 Y-16 11626467 LDL 01/19/07 1 L-04 11603118 MEM LDL 12/30/06 1 11-24A 11638611 US IT 01/24/07 1 1-33 11631645 USIT 01/09/07 1 A-05A 11533393 USIT 01/04/07 1 DS 05-10B 11626469 SCMT 01/22/07 1 W-29 11536193 USIT 01/05/07 1 R-15A 11626266 US IT (CEMENT EVALUATION) 01/11/07 1 R-15A 11626266 US IT (CORROSION) 01/11/07 1 MPF-99 11637306 CEMENT EVALUATION/CBL 01/14/07 1 R-12 11414757 RST 09/01/06 1 1 NK-38A 40011271 OH EDIT MWD/LWD 03/11/05 3 1 NK-38A PB1 40011271 OH EDIT MWD/LWD 02/26/05 2 1 MPC-28A 11649937 MEM INJECTION PROFILE 01/05/07 1 DS 07 -04A 11533394 LDL 01/05/07 1 F-23A 11626066 LDL 01/08/07 1 P2-19 11630449 LDL 01/14/07 1 Y-09A 11630450 LDL 01/16/07 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & consfl.!!.!t~!lft!leEI\/E·" 2525 Gambell Street, ~«V ..... ft .." Anchorage, AK 99503-2838 ATTN: Beth FEB 2 0 ZOOl Date Delivered: Received by: 1\Ia¡;ka Oil & Gas Cons. Commìssion Anchorage ICJ tJ e . . RECE\VED 06/01/06 Schlumberger Jut't 0 8 2006 - ·Il..... ""~11S ecmm\¡$OO ,.~~ '''';1 Gt 1..:<ìS v.; . Ar.d1crage Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 NO. 3828 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Field: Prudhoe Bay W D ell Job# log. escription Date Bl Color CD !P2-2;¿ I '"1'J. - 8"-19 11136744 l.òL::ì 11/13/05 1 [P2-16 c.~ - 1 ;.:;J'~ 11058238 WFl u8/18/u5 1 P2-36 íC;'+-I(~n NIA lDl 07/13/05 1 P2-50B I ''i',,ç - 0'7 c:-- N/A lDL 07/16/05 1 16-03 ;7;1 -(, 11076454 INJECTION PROFILE 07/28/05 1 P2-36 ¡ê¡1 -/1 ,;6 11051061 GLS/LDL 06115/05 1 4-18/5-30 1~-'Í<:-1¡0 10564459 PSP GLS 04/18/03 1 1-33B/l-24 I C; 'i( - ;::)5:) 10889175 SCMT 10/12104 1 04-41 A 1'1t- -l':"'~ N/A LDl 07/18/05 1 15-09A I~ì,~ -I.V-< N/A Oil PHASE BOTTOM HOLE SAMPLE 02102105 1 09-17 ! '1--'1- - ,...,:~ ":< 11076460 INJECTION PROFilE 08/18/05 1 16-09A IC¡ / - (')~-K 11051089 PRODUCTION LOG W/DEFT 08/18/05 1 16-11 ¡ ~,' - I '7< 11058249 lDL 09/14/05 1 17-02 I ~ L' - 0 TO N/A SENSA MEMORY LDL 10/17/05 1 NK-38A D(~4 -;::J'-f I 10687734 MDT 02/27/05 1 R-35 ì c., '~ - ["11 I 11212863 USIT OS/26/06 1 D-09A I C;~ - ()7(<'- 11221576 USIT OS/27/06 1 L5-16 i""i(+-r,;\, C\ 11212864 US IT OS/28/06 1 K-08A ':ì .,,~ -- iLl, 11054182 MCNL .:F i~-::c:...¡q ~ 06/06/05 1 1 H-04A '¡D,~ .- /(/ { 10715365 MCNL +t. 1::0:: <-I (7 -=? 11/27/03 1 1 Petrotechnical Data Center LR2-1 900 E, Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth /~ (1 ! r~ í//I I Q t/ (/ j ,ê .' ~ì/V' 1> bp . . o March 20, 2006 BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Bill Van Dyke, Acting-Director Division of Oil & Gas Department of Natural Resources 550 West th Avenue, Suite 800 Anchorage, AK 99501-3560 Re: ADL 034630 - NK-38A Well- Request for Extension of Tract Operations ~D~~)4.1 ADL 034635 - NK-43 Well- Request for Extension of Tract Operations ADL 034635 - NK-65A Well- Request for Extension of Tract Operations Prudhoe Bay Unit Dear Mr. Van Dyke: On September 12,2005, the Division approved tract operations for BP Exploration (Alaska) Inc. (BPXA) to produce and inject from the Ivishak interval from the NK-38A and NK-65A Wells. This approval is valid until April 1,2006 to allow production and injection during the Raven Participating Area (RP A) application process. On October 27,2005, the Division approved tract operations for BPXA to commingle and conduct production from the Sag River and Kuparuk intervals in the NK-43 Well. This approval is valid for 180 days from the date test production from the Sag River interval in the NK-43 wellbore flows into the Lisburne Production Center. Test production commenced on February 3,2006, and thus this approval extends through August 3, 2006. On· February 8, 2006, BPXA submitted an application with the Division to approve formation of the RPA. The proposed RPA will encompass the Ivishak and Sag River Formations in this area, including production from the NK-38A and NK-43 Wells. BPXA has also filed an application with the AOGCC for pool rules for a Raven OilPool. To allow continued production and injection for the NK-38A, NK-43 and NK-65A Wells while the Division completes its review and action on the RP A, we request that the above referenced tract operations for each of the wells be extended until September I, 2006, or the date the RPA becomes effective, whichever occurs first. Please contact Gary Gustafson at 564-5304 if you should have any questions. Thank you. Sincerely yours, ~ ~an~J GPB Manager or .. . . CC: Don Inee, ConoeoPhillips Alaska Greg Threadgill, ExxonMobil Gary F orsthoff, Chevron Paul Winslow, Forest Oil Gary Benson, BPXA Gary Gustafson, BPXA Art Copoulos, DO&G Jane Williamson, AOGCC 01/04/06 Schlumberger NO. 3642 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay, Milne pt. WII CI CD J b L D D BL e o # og escrlptlon ate o or Z-01 11087166 LDL 08/05/05 1 Y-13 N/A PRODUCTION LOG 05/01/05 1 L2-14B 10670029 PROD PROFILE 08/20/04 1 Y-OBA 11047356 MEMORY/SENSA LDL 10/15/05 1 X-36 11075908 MEMORY INJECTION PROFILE 08/17/05 1 X-30 10662973 GLS 12/02/03 1 S-29A 11087187 INJECTION PROFILE 10/04/05 1 P2-01 11072880 LDL 08/06/05 1 DS 12-08C 11087208 SBHP SURVEY 12/24/05 1 D.S. 09-28A 11094347 LDL 12/28/05 1 P2-34 N/A INJECTION PROFILE 06/02/05 1 Q-05A 11087203 SBHP SURVEY 11/27/05 1 NK-09 11062632 PROD PROFILE WID EFT 07/01/05 1 NK·38A ó204 0241 11075902 MEMORY PROD PROFILE 07/27/05 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 AnN B.t~ Received b . (j"j Date Delivered: . . . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Helen Warman (AOGCC) Well No NK-38A Date Dispatched: 18-May-05 Installation/Rig Nabors 9ES Dispatched By: Nate Rose Data No Of Prints No of Floppies Surveys 2 Received By: Please sign and return to: James H. Johnson BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax: 907 -564-4005 e-mail address:johnsojh@bp.com LWD Log Delivery V 1.1 , 10-02-03 r'~ .(.. ~ b to( - ). c.¡ I . . Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska! Inc. Dispatched To: Helen Warman (AOGCC! Well No NK-38APBl Date Dispatched: 18-May-05 Installation/Rig Nabors 9ES Dispatched By: Nate Rose Data No Of Prints No of Floppies Surveys 2 1 J I A , 1\ ()UJJ Please sign and return to: James H. Johnson Received By: J .Ä BP Exploration (Alaska) Inc. . Petrotechnical Data Center (LR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax: 907 -564-4005 e-mail address: johnsojh@bp.com LWD Log Delivery Vl.l, 10-02-03 f:l\. ^b'-( - Ì\ c..( , NK-38A (PTD #2042410) Classified as Problem Well All, Well NK-38A (PTD #2042410) has been found to have sustained casing pressure on the OA. The TIO's on 04/19/05 were 1930/2320/1930 when a TI FL was conducted and passed for waiver evaluation. The TIO's post TIFL on 04/21/05 were 2080/600/620. The minimum burst pressure of the OA is 3450 psi. Once the well is evaluated for a waiver, the Well Integrity Coordinator will discuss plans with the AOGCC to request Administrative Approval to operate the well with an OA pressure limit above 45% of burst. The plan forward for this well is as follows: Obj: Eval for IAxOA Comm 1. DHD: TIFL, bleed OAP - PASSED 2. FB: MITOA to 3000 psi 3. WAY: Waiver for IAxOA Comm 4. WIC: Review with AOGCC plan for AA to operate wi OAP limit >45% of burst A well bore schematic has been included for reference. «NK-38A.ZI P» The well has been classified as a Problem well. Please call if you have any questions. Thank you, )lnna (])u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 Content-Description: NK-38A.ZIP Content-Type: applicationlx -zip-compressed Content-Encoding: base64 1 of I 5/10/20058:44 AM TREE = WELLHEAD = ACTUATOR = KB. ELBI = BF. ELBI = KOP= Max Angle = Datum MD = Datum TV D = 4-1/16" CrN 13-5/8" FMC BAKER 28.50' 20' 9163' 95° @ 15234' Nt838A As Built .1 SAFETY NOTES: FROM DRLG - DRAFT 9200' SS 2115' -1 4-1/2" Well Star TRSV, ID = 3.813" 13-3/8" CSG, 68172#, NT-80 H 4544' GAS LIFT MANDRELS ST MD TVD OBI TYPE VLV LATCH PORT DATE 6 3033 2999 32 4 1/2" x 1 1/2" OCR RKP YES 3/15/2005 5 4923 4502 34 4 1/2" x 1 1/2" dummy RK 3/15/2005 4 6805 5509 32 41/2" x 1 1/2" dummy RK 3/15/2005 3 9158 6508 38 4 1/2" x 1" dummy BK 3/15/2005 2 10794 7503 43 41/2" x 1" dummy BK 3/15/2005 1 12132 8512 37 41/2" x 1" dummy BK 3/15/2005 Minimum ID = 3.725" @ 13368' 4-1/2" XN NIPPLE 4-112" TBG, 12.6#, L-80 3.958" IDI- 13380.9' 1 14 1/2" 11.6# L-80 Liner PBTD H 16,677' I TOP OF 7" LNR 141/2" 11.6# (3.958" 10) 0.0152 bpf H 16,763' 9 5/8" X 7" Liner HGR / PKR ( 11.61' Tieback) 9 518" Window ÆRFORA TION SUMMARY REF LOG: rvlWD GR ON 01103/05 ANGLE AT TOP ÆRF: 84 @ 9540' Note:Refer to FToduction DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 2-112" 6 15504 - 15743 0 03113/05 2-1/2" 6 15793-16396 0 03/13/05 2-1/2" 6 16446 - 16556 0 03113/05 2-1/2" 6 16576 - 16676 0 03113/05 13303' 13324' 13347' 13368' 13381' 41/2" - 'X' landing nipple - 3.813" 10 4112" X 7" Baker Hydro-Set S-3 Packer 41/2" - 'X' landing nipple - 3.813" 10 41/2" - 'XN' nipple - 3.725" ID No-go 41/2"WLEG -----113,372'1-17" X 5" Liner HGR / PKR ( 11.75' Tieback) 1 13,532' 1-17" 26# L-80 (6.276" ID) 4 1/2" Chemical Cut H -9,400' I Top cement abandonment Plug 15,600' 4-112" TBG, 12.6#, L-80 3.958" IDH 15904' 9-5/8" CSG, 47#, NT-80S H 16060' I 14,189' H61/8"PilotholeTD(PB1) I 7" LNR, 29#, NT-80S, 6.184" 10 I 17475' DATE 03/01195 01/03/05 03116/05 REV BY COMMENTS ORIG COMPLETION, (POOL 7) PGS PROPOSED SIDETRACK-WP11 JNC FINAL COMPLETION DATE RBI BY COMMENTS NIAKUK UNrT WELL: NK-38A PERMrT No: "1941700 API No: 50-029-22540-01 SEC 36, T12N, R15E. 2268.66' FEL 8. 911.26' FNL BP Exploration (Alaska) ~~"'~.~:~ In..ìl1' f\\ j¡=1jr rß)Jl~Ü~ !.!.P...1·ji....j /7\'\. .li¡T,. :~ ,: ,1 :\ J :1:2J' jj:~ '~¡ ¡ j t~, J\ *s,.', ; :Il i¡ :¡ :1 'j l :i....<.. ~ :¡,¡ J J-.. ~\ "¡ ~:J~,ì1 l/¥~li~ J~,\r-"':i11 ~J W i:-i 'W ~ LJ '-U~,~~) ;- ;20(- L cf/ .~ 1 .I FRANK H. MURKOWSKI, GOVERNOR / A....ASIiA OIL AND GAS CONSERVATION COMMISSION , ,I 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 April 13, 2005 Mr. Mark Weggeland Greater Pt. McIntyre Area Manager BP Exploration Alaska, Inc. P.O. Box 196612 Anchorage, AK 99619-6612 Re: Waiver of Gas-Oil Ratio Limitations for Niakuk well NK-38A Dear Mr. Weggeland: By letter dated April 12, 2005 you requested waiver of the requirements of 20 MC 25.240(a) which limits producing gas-oil ratio ("GOR") within an oil well to no more than twice the original solution GOR of the crude. Within a few days, the GOR of well NK-38A is anticipated to exceed these limits. NK-38A began production testing on March 30, 2005. The well produces within the Ivishak formation within the Niakuk area. Pool rules have not been established for this formation. BPXA wishes to continue production until July 31, 2005 to gain information to help determine the optimum reservoir management program for the pool, including the feasibility of water injection. Based upon preliminary modeling work, BPXA does not expect negative impact to ultimate recovery as a result of production at higher GORs during the requested test period. 20 MC 25.240(b)(3) allows the Commission to waive the GOR limitation if acquisition of pool performance data is necessary to determine an optimum reservoir management program. Waiver of the GOR during the proposed test period will not promote waste of the resource and is needed to help determine an optimum development plan for the r se oir. Therefore, the Commission waives requirements of 20 MC 25.240(a u . July 31, 2005. -' bp . . BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 12, 2005 Commissioners Alaska Oil and Gas Conservation Commission 333 West ih Avenue, Suite 100 Anchorage, AK 99501 Re: Waiver of Gas-Oil Ratio Limitations for the NK-38A Well ~ A .11.'';¡: n·! 'i). r'".. !i'nns. C!3ffi11\\$s\m::\ Mas\(~ yi\ ~ u.... u Anchorage Dear Commissioners: In accordance with 20 AAC 25.240(b)(3), BP Exploration (Alaska) Inc. (BPXA), operator of the Prudhoe Bay Unit (PBU), applies to waive the Gas-Oil Ratio (GOR) limitations for the NK-38A Well in the Niakuk area. This waiver is needed to acquire the pool performance data required to determine an optimum reservoir management program. NK-38A Well production testing began March 30, 2005. Recent reservoir trends indicate that within a few days the NK-38A Well is expected to exceed the established GOR. BPXA wishes to continue production testing for this Ivishak well to obtain enough pool performance data to help determine an optimum reservoir management program. Therefore, effective immediately, we request a waiver on the GOR limitation for this well until July 31,2005. During the requested waiver period, BPXA will perform laboratory shrinkage tests to allow the well tests to be corrected and to establish initial tract GOR. We will also perform reservoir surveillance to determine completion efficiency. These data will be used to develop an optimum reservoir management program, including water injection feasibility. The NK-38A Well will be tested regularly during this timeframe to verify reservoir performance. Based upon our preliminary modeling work, we do not expect that continued well production at a higher GOR during the waiver period will affect ultimate recovery. Should you have any questions related to this request, don't hesitate to contact Gary Gustafson at 564-5304. Sincerely Yours, 'Vv~W~ Mark Weggeland GPMA Manager /' 1 . Cc: Greg Threadgill, ExxonMobil Don Ince, ConocoPhillips Gary Forsthoff, Chevron Leonard Gurule, Forest Oil Gary Gustafson, BPXA Leslie Senden, BPXA Bob Gerik, BPXA . 2 .. _ STATE OF ALASKA _ ALAS~IL AND GAS CONSERVATION CO~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG RECEIVED .. 1a. Well Status: IBI Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: DIR I GR I RES, DIR I GR I RES I NEU, DIR I GR I RES I NEU I ABI, MDT CASING, LINER AND CEMENTING RECORD ~ETTING UEPTH MD ~ETTING UEPTH TVD HOLE TOP BOTTOM TOP BOTTOM SIZE Surface 80' Surface 80' 30" 40' 4544' 40' 4213' 16" 37' 9163' 37' 6510' 12-1/4" 9003' 13534' 13534' 9598' 8-1/2" 13372' 16763' 9482' 9923' 6-1/8" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1410' NSL, 853' WEL, SEC. 36, T12N, R15E, UM Top of Productive Horizon: 3447' NSL, 603' WEL, SEC. 25, T12N, R15E, UM Total Depth: 4800' NSL, 566' WEL, SEC. 25, T12N, R15E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- ___z.g]2~ y- ~~9950 Zone- _ ASP4 _ TPI: x- 721740 y- 5987271 Zone- ASP4 -------- ~~ Total Depth: x- 721736 y- 5988624 Zone- ASP4 ___ ______ n__ ___n__ ___ ____ 18. Directional Survey IBI Yes 0 No 2. CASING SIZE WT. PER FT. 94# 68# 47# 26# 12.6# GRADE H-40 NT80CYHE NT80S L-80 L-80 20" 13-3/8" 9-518" 7" 4-1/2" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 2-1/2" Gun Diameter, 6spf MD TVD MD TVD 15504' - 15743' 9907' - 9903' 15793' - 16396' 9900' - 9896' 16446' - 16556' 9900' - 9907' 16576' - 16676' 9908' - 9915' One Other 5. Date Camp., Susp., or Aband. 3/16/2005 6. Date Spudded 2/12/2005 7. Date T.D. Reached 3/8/2005 8. KB Elevation (ft): 48.4' 9. Plug Back Depth (MD+ TVD) 16678 + 9915 10. Total Depth (MD+TVD) 16765 + 9923 11. Depth where SSSV set 2115' MD 19. Water depth, if offshore N/A MSL 24. SIZE 4-1/2", 12.6#, L-80 1 b. Wel~cp~s.... 7 LUUJ IBI Development 0 Exploratory q,§.tr.· . ¡;;;;¡ ~ortIØiss'on ~"Þérmit t~~eßIW~Ui>er 204-241 13. API Number 50- 029-22540-01-00 14. Well Name and Number: PBU NK-38A 15. Field I Pool(s): Prudhoe Bay Field I Undefined Ivishak - Sag River Pool Ft Ft 16. Property Designation: ADL 034630 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) CEMENTING RECORD 260 sx Arctic Set (Approx.) 1418 sx PF 'E', 375 sx Class 'G' 352 sx Class 'G' 184 sx Class 'G' 399 sx Class 'G' AMOUNT PUllED TUBING RECORD DEPTH SET (MD) 13381' PACKER SET (MD) 13324' 25. ACID, FRACTURE,CEMENTSaUEËZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2100' Freeze Protect wI 145 Bbls of Diesel CHOKE SIZE I GAS-OIL RATIO 57 1 ,155 all GRAVITy-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". ,.".:-:.-, NOIÌ.,.._ ¡ÞJ;/¿:J5 ~~" ....-, " t·.,·c;.) : J . 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): March 30, 2005 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBl 4/6/2005 8 TEST PERIOD + 696 Flow Tubing Casing Pressure CALCULATED + Oll-BBL Press. 1,715 2,376 24-HoUR RATE 2,087 27. -",'- Form 1 ~'·RëVrsed 12/2003 GAs-McF 803 W ATER-BBl 1.62 GAs-McF 2,410 WATER-BBL 4.85 RBDMS 8Ft CONTINUED ON REVERSE SIDE J J 2005 (JP <. 28. GEOLOGIC MARKER 29. ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". West Sak 9779' 6810' None CM3 CM1 10634' 12147 7385' 8524' K-3 12506' 8819' HRZ 12692' 8971' Kuparuk 12948' 9174' LCU I Kingak 12974' 9193' Sag River Sag River 13517' 13521' 9586' 9589' Shublik 13637' 9668' Sadlerochit Zone 2C Zone 2B Zone 2A Zone 2A Zone 1 A Zone 1B Zone 1B Base Sadlerochit 13789' 13892' 13990' 14258' 14900' 15408' 15772' 16420' 16700' 9754' 9801' 9839' 9912' 9923' 9905' 9901' 9898' 9917' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble PBU NK-38A Well Number Title Technical Assistant Date 0 -07"05 204-241 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Phil Smith, 564-4897 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 ¡jigits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only 4,233 (psi) 12.51 (ppg) 5,987 (psi) 12.00 (ppg) - Printed: 3/22/2005 11: 11 :55 AM 985 (psi 900 (psi 9.60 (ppg) 0.20 (ppg) 6,513.8 (ft 9,600.0 (ft 9,173.5 (ft) 3,557.0 (ft) 2/11/2005 I FIT 2/22/2005 FIT Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/4/2005 14:00 - 15:00 1.00 MOB P PRE Slip and cut drilling line. 15:00 - 17:30 2.50 MOB P PRE Disconnect blocks from topdrive, bridle up, secure lines in derrick for derrick down move. 17:30 - 19:00 1.50 MOB P PRE PJSM, move pits position at pad entrance, pickup matting boards. 19:00 - 21 :00 2.00 MOB P PRE Load truck shop and satilite camp, move camp and shop from V-pad to Niakuk. 21 :00 - 00:00 3.00 MOB P PRE Pull sub off V-107 position at pad entrance, pickup mats and location, lower pipe chute, secure derrick for move. 2/5/2005 00:00 - 06:00 6.00 MOB P PRE Move camp & shop to Niakuk, temporarily spot camp on L5, camp on location at 04:00. Lower derrick, and prep Sub for move to Niakuk 06:00 - 21 :30 15.50 MOB N WAIT PRE Doyon 16 is currently moving from S-pad to DS-7. Rig on standby until Doyon 16 move is completed. 21 :30 - 00:00 2.50 MOB P PRE Move Sub & pits, from V-Pad, rig and pits between Z·Pad and W-Pad At midnight. 2/6/2005 00:00 - 01 :00 1.00 MOB P PRE Move Sub & pits, shut down at S curves between Wand S-Pad to check tires and allow traffic to pass. 01 :00 - 03:00 2.00 MOB P PRE Re-torque lug nuts on rig tires. 03:00 - 00:00 21.00 MOB P PRE Continue moving sub and pits on Spine road to OXbow, Left on Oxbow road to West beach road, right on West beach road past PBOC, on to East dock road, Rig at L5, Niakuk intersection at midnight, approximetly 4 miles from location. 217/2005 00:00 - 03:30 3.50 MOB P PRE Continue moving Rig and pits to Niakuk, rig on location at 03:30 03:30 - 06:00 2.50 MOB P PRE Position sub to raise derrick, held PSJM, with Toolpusher and crew, prep and raise derrick, raise pipe chute. 06:00 - 07:30 1.50 MOB P PRE When positioning rig to pull over well, hand noticed a small leak on a hydraulic hose for steering cylinder on rig moving system, shut down moving operation. notified # 5700 of incident, clean up leak as per ACS Rep, replace hose. 07:30 - 10:00 2.50 MOB P PRE Lay mats and crib up around cellar, spread herculite. 10:00 - 11 :00 1.00 MOB P PRE Spot and Level sub on NK-38A. 11 :00 - 13:00 2.00 MOB P PRE Disconnect moving jeep from pit complex, spot pits and cuttings tank. Connect service lines and power to pit complex. 13:00 - 15:00 2.00 RIGU P PRE Rig up secondary valves on lA, take on 8.4 ppg seawater in pits. Accept Rig on NK-38A @ 13:00 hrs 2/7/2005 15:00 - 17:00 2.00 RIGU P PRE Un-bridle and secure lines in derrick, pin blocks to topdrive. 17:00 - 18:30 1.50 RIGU P PRE Rig up floor. 18:30 - 21 :30 3.00 WHSUR P DECOMP Rig up DSM lubricator, unable to screw into BPV, pull lubricator wrap tree with herculite and thaw tree, run steam hose inside tree to thaw ice. make up lubricator and pull BPV, lay down lubricator. Zero pressure on annulus and tubing. 21 :30 - 22:00 0.50 WHSUR P DECOMP Held pre-spud meeting with Rig crew, Co Rep, Toolpusher, Mud engineer. 22:00 - 00:00 2.00 WHSUR P DECOMP Blow Air through circulating lines, test lines to 3,500 psi, no leaks. Pump down annulus displace 35 bbls diesel from tubing at 3 bpm, 250 psi, switch over and pump down tubing at 4.5 bpm, 275 psi pumped 160 bbls, recovered 124 bbls diesel from annulus. 2/8/2005 00:00 - 02:00 2.00 WHSUR P DECOMP Continue circulating until clean returns at shakers, 358 bbls @ Printed: 3/22/2005 11: 12:01 AM " ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRIILLlNG I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/8/2005 00:00 - 02:00 2.00 WHSUR P DECOMP 6 bpm, 465 psi. shut down and check flow, zerO pressure on annulus and tubing. 02:00 - 03:00 1.00 WHSUR P DECOMP Blow down choke manifold and circulating lines, install TWC, test from below to 1,000 psi, ok. 03:00 - 05:00 2.00 WHSUR P DECOMP Nipple down adapter flange and tree, inspect hanger lifting threads,function lock down screws, made up xo in top of tubing hanger 8 turns. 05:00 - 09:00 4.00 BOPSU DECOMP Nipple up BOP, riser and mouse hole. 09:00 - 10:00 1.00 BOPSU DECOMP Install secondary valve on 13 5/8" spacer spool. 10:00 - 11 :30 1.50 BOPSU DECOMP Change topdrive saver sub and guide to 5", Calibrate LEL & H2S gas detectors. 11 :30 - 12:30 1.00 BOPSU DECOMP Rig up BOP test equipment. 12:30 - 18:00 5.50 BOPSU DECOMP Test BOPE to 250 psi low, 4,000 psi high per Nabors testing procedure, Jeff Jones with AOGCC waived witness of BOP test. Test was witnessed by WSL. Brian Buzby and Nabors Toolpusher William Bixby. Total test time was 4 hrs, 5" TIW Safety valve failed, valve was replaced and new one tested to 4,000 psi. High pressure hose on test pump manifold failed during test, hose was replaced and testing continued. Unable to test lower pipe rams at this time due to wellhead and BOP configuration, rams will be tested as soon as completion string is laid down. 18:00 - 18:30 0.50 WHSUR P DECOMP Blow down choke manifold and lines, rig down test equipment. 18:30 - 19:30 1.00 WHSUR P DECOMP Rig up DSM lubricator and extension and pull TWC, lay down lubricator and extension. 19:30 - 20:00 0.50 PULL P DECOMP Make up landing joint, BOLDS. 20:00 - 20:30 0.50 PULL P DECOMP Pull tubing hanger to rig floor, up weight = 120k 20:30 - 21 :30 1.00 PULL P DECOMP Circulate bottoms up @ 500 gpm, 690 psi, while rigging up to lay down tubing. bottoms up was clean, monitor well. 21 :30 - 00:00 2.50 PULL P DECOMP Back out landing joint, lay down hanger, lay down 4.5" 12.6# L-80 tubing. 2/9/2005 00:00 - 08:00 8.00 PULL P DECOMP POH, lay down 4.5" 12.6# L-80 tubing. laid down a total of 224 joints 4.5" tubing, 2 pup joints, 1 X nipple, 1 GLM, 19.87' cut off joint. 08:00 - 08:30 0.50 PULL P DECOMP Rig down tubing equipment, clear and clean floor. 08:30 - 09:00 0.50 WHSUR P DECOMP Rig up BOP test equipment. 09:00 - 10:00 1.00 BOPSU P DECOMP Test lower pipe rams to 250 psi low, 4,000 psi, record on chart, test was witnessed by WSL Jeff Cutler and Nabors Toolpusher William Bixby. 10:00 - 10:30 0.50 WHSUR P DECOMP Rig down BOP test equipment, install wear ring. 10:30 - 11 :30 1.00 CLEAN P DECOMP Bring mills and associated tools to rig floor 11 :30 - 15:00 3.50 CLEAN P DECOMP Make up 8.5" junk mill, Bit sub, 8.5" upper string mill on a joint of 5" HWDP, 96.6" DC's, XO, 21 joints of 4" HWDP, 15:00 - 00:00 9.00 CLEAN P DECOMP RIH with Mills, picking up 5" DP, pickup 24 joints, POH stand back 8 stands. Continue picking up 5" DP, took extra time to pick up DP due to rust and scale accumulation in pipe. Circulate Dp volume every 50 joints, 6 bpm @ 260 psi. 2/1 0/2005 00:00 - 05:30 5.50 CLEAN P DECOMP Continue RIH wI mills, picking up 5" DP. 05:30 - 05:45 0.25 CLEAN P DECOMP Make up topdrive, break circulation wash down tag tubing stab @ 9,395', up weight = 195k, down weight = 150k, string weight = 170k 05:45 - 06:30 0.75 CLEAN P DECOMP Circulate bottoms up, @ 495 gpm, 1,140 psi. had a considerable amount of fine sand back at bottoms up, Printed: 3/22/2005 11 :12:01 AM '- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/10/2005 05:45 - 06:30 0.75 CLEAN P DECOMP increased flow rate to 540 gpm, 1,350 psi circulate until shakers cleaned up. 06:30 - 11 :00 4.50 CLEAN P DECOMP POH with clean out assembly 11 :00 - 12:00 1.00 CLEAN P DECOMP Stand back BHA, lay down mills. 12:00 - 13:30 1.50 DHB P DECOMP PJSM, Rig up Schlumberger. 13:30 - 17:30 4.00 DHB N DPRB DECOMP Pickup Halliburton 9 5/8" EZSV on E-line w/ GRlCCL, RIH, unable to get past 7,597 ELM, POH with E-Line, lay down bridge plug and setting tool. 17:30 - 20:30 3.00 DHB P DECOMP Pickup additional roller weight bars and 8.02" gauge ring junk basket, RIH with gauge ring junk basket, tag up @ 9,399, POH with same, clean junk basket, small amount of fine sand 1/2 cup, lay down GRlJB. 20:30 - 00:00 3.50 DHB P DECOMP Pickup Halliburton 9 5/8" EZSV w/ GR/CCL, RIH same on E-line tie in w/GRlCCL, set EZSV @ 9,205' set down to confirm set, POH with setting tool. 2/11/2005 00:00 - 01 :30 1.50 DHB P DECOMP Close blind rams, test 9 5/8" casing to 4,000 psi for 30 min record on chart, test witnessed by WSL Brian Buzby, test ok. Rig down Schlumberger. 01 :30 - 02:00 0.50 STWHIP P WEXIT PJSM, bring Baker and MWD tools to rig floor. 02:00 - 04:00 2.00 STWHIP P WEXIT Make up 9 5/8" Whipstock and mills, pickup MWD and orient whipstock and MWD, pickup remaining BHA, plus 1 stand 5" DP to 1,065' 04:00 - 04:30 0.50 STWHIP P WEXIT Shallow test MWD @ 1,065',520 gpm, 900 psi 04:30 - 10:30 6.00 STWHIP P WEXIT RIH with Whipstock milling assembly, to 9,141' 10:30 -11:00 0.50 STWHIP P WEXIT Make up topdrive, break circulation, orient whipstock to 85 deg left, circulate down, tag up @ 9,189', picked up washed down tagged up @ 9,189' set down 25k to set anchor, picked up to confirm set, set down 45k to shear off whipstock. Top of whipstock @ 9,163' bottom of whipstock @ 9,179' 11 :00 - 12:00 1.00 STWHIP P WEXIT Displace well over to 9.6 PPG LSND milling fluid, @ 550 gpm, 1,550 psi. 12:00 - 15:00 3.00 STWHIP P WEXIT Mill window from 9,163' to 9,179', wob 1-5k, rpm 80-100, torque 9-13k, 510 gpm, 1,540 psi, good metal cuttings at shakers during milling operations. 15:00 - 17:30 2.50 STWHIP P WEXIT Mill formation from 9,179' to 9,192', wob 5-20k, rpm 100, torque 10-11 k, 510 gpm 1 ,540 psi. 17:30 - 18:30 1.00 STWHIP P WEXIT Pump 25 bbl high vis sweep, with 1 ppb super sweep, @ 510 gpm, 1,518 psi. Ream and backream window as sweep goes around corner, work mills through window with no rotation, window area clean. Circulate until shakers are clean 9.6 ppg in & out. 18:30 - 19:00 0.50 STWHIP P WEXIT Pull mills above whipstock, perform FIT, MD 9,171' tvd 6,513' mud weight 9.6 ppg, pressure attained 985 psi, 12.5 ppg EMW. 19:00 - 19:30 0.50 STWHIP P WEXIT Monitor well, pump dry job, blow down topdrive. 19:30 - 00:00 4.50 STWHIP P WEXIT POH with milling assembly to 1,014' 2/12/2005 00:00 - 01 :00 1.00 STWHIP P WEXIT Stand back 4' HWDP,lay down 9 De's, MWD and mills, mills were in gauge. 01 :00 - 01 :30 0.50 STWHIP P WEXIT Clear floor of all milling tools, Clean floor. 01 :30 - 02:30 1.00 BOPSU P WEXIT Service wear ring, make up flushing tool, flush stack, choke and kill line, install wear ring. 02:30 - 05:30 3.00 STWHIP P WEXIT Pickup 8.5" drilling assembly per directional driller, to 927' Shallow test MWD. 05:30 - 09:00 3.50 STWHIP P WEXIT RIH with 8.5" Driling assembly, picking up 120 joints of 4" DP. Printed: 3/22/2005 11: 12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/12/2005 09:00 - 10:00 1.00 STWHIP P WEXIT Service topdrive 10:00 - 13:00 3.00 STWHIP P WEXIT RIH with drilling assembly w/5" DP from derrick to 9,103' 13:00 - 14:00 1.00 STWHIP P WEXIT Make up topdrive, break circulation, circulate bottoms up, up weight = 164k, dn weight = 138k, rt weight = 144k, establish ECD basline at 550 gpm, 2,270 psi, 80 rpm, ECD = 10.39, orient 30L, shut down pumps work BHA through window, no problem. 14:00 - 15:00 1.00 STWHIP P WEXIT Clean out under gauged hole from 9,184' to 9,192. 15:00 - 00:00 9.00 DRILL P INT1 Directional drill 8.5" Intermediate hole from 9,192' to 9,790' , wob = 5-15k, 580 gpm, 2530 psi off bottom, 3,000 psi on bottom, 80 rpm, 8-9k toque on bottom, 7-8K off bottom, ECD between 10.5 to 10.7 while drilling. AST = 3.48 ART = 1.57 2/13/2005 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8.5" Intermediate hole from 9,790' to 10,370' , wob = 5-15k, 2 - 5K when sliding, 580 gpm, 2,775 psi off bottom, 3,305 psi on bottom, 80 rpm, 9-10k toque on bottom, 6-7K off bottom, ECD between 10.5 to 10.7 Experiencing motor . stalls when sliding, back off weight to avoid stalls and re-orienting. AST = 6.2 ART = 1.74 12:00 - 00:00 12.00 DRILL P INT1 Directional drill 8.5" Intermediate hole from 10,370' to 10,637' , wob = 5-15k when rotating, 2 - 5K when sliding, maintaining 50 - 100 psi differential pressure to minimize motor staling, 580 gpm, 2,780 psi off bottom, 3,200 psi on bottom, 80 rpm, 9k toque on bottom, 7K off bottom, ECD between 10.45 AST = 6.85 ART = .33 2/14/2005 00:00 - 10:30 10.50 DRILL P INT1 Directional drill 8.5" Intermediate hole from 10,637' to 11,375' , wob = 10-15k, 580 gpm, 3,000 psi off bottom, 3,580 psi on bottom, 80 rpm, 7-9k toque on bottom, 6-7K off bottom, Cal. ECD 10.46, ECD 10.98 AST = 4.38 ART = 3.24 10:30 - 15:00 4.50 DRILL N RREP INT1 The return line for the electric brake cooling system became partially plugged, resulting in a 1 gal leak, non-emergency personnel were notified, contaminated area was cleaned up and disposed of by ACS personnel, see IR# 1243337. Remove blockage from return line, clean and remove residual glycol from under draw works. 15:00 - 00:00 9.00 DRILL P INT1 Directional drill 8.5" Intermediate hole from 11,375' to 11,922' , wob = 2-15k, 580 gpm, 3,320 psi off bottom, 3,850 psi on bottom, 80 rpm, 9k toque on bottom, 7K off bottom, up WI = 207k, dn WI = 165k, rt WI = 185k, Cal. ECD 10.31, ECD 10.95 AST = 1.77 ART = 3.11 2/15/2005 00:00 - 08:30 8.50 DRILL P INT1 Directional drill 8.5" Intermediate hole from 11,922' to 12,036' , wob = 2-15k, 580 gpm, 3,260 psi off bottom, 3,560 psi on bottom, 80 rpm, 9-10k toque on bottom, 6-7K off bottom, sliding becoming more difficult, weight stacking and falling off stalling motor, increase lubricant concentration to 4% Cal. ECD 10.31, ECD 10.89. AST = 5.38 08:30 - 10:00 1.50 DRILL P INT1 Circulate 1.5 times bottoms up - 580 gpm, 3,550 psi, 100 rpm. Circulate a high visc sweep from surface to surface, Cal ECD 10.44, ECD 10.67. 10:00 - 12:30 2.50 DRILL P INT1 POH from 12,036' MD / 8,434' TVD to check the condition of the bit. PU - 225K, SO - 170K. Worked through minor tight Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/15/2005 10:00 - 12:30 2.50 DRILL P INT1 spots @ 10,707',10,315',9,295' and 9,207'. Wiped across the intervals once and then saw no problems. Monitor the well at the window - stable. 12:30 - 13:30 1.00 DRILL P INT1 MAD pass from 9,163' to 8,912' @ 500 fph max pulling speed. 13:30 - 18:00 4.50 DRILL P INT1 POH from 8,912' to the top of the HWDP @ 927'. Hold a PJSM to standbacklLD the BHA. 18:00 - 20:00 2.00 DRILL P INT1 Stand back the HWDP, jars and the collars. LD remaining BHA and flush the MWD/LWD tools and motor. Break out the 8.5" DS147 PDC bit - graded 1/4/BT/GIXI3/CT/PR 20:00 - 20:30 0.50 DRILL P INT1 Clean and clear the floor. PJSM for picking up the 8.5" RSS BHA. 20:30 - 00:00 3.50 DRILL P INT1 MU 8.5" RSS BHA to 912'. Shallow test the MWD tools - good BHA#4: 8.5" Hycalog RS161 PDC bit, 6-314" PowerDrive Assy, 6-3/4" LWD/CDR, 6-3/4" MWD, 6-3/4" NM stabilizer, 3 x 5" NM flex collars, xo, Dailey jars, 1 x 5" HWDP, xo, 22 x 4" HWDP. 2/16/2005 00:00 - 03:00 3.00 DRILL P INT1 RIH with 3,732' of 4" HT40 DP, xo and 5" DP to 9,163'. 03:00 - 04:30 1.50 DRILL P INT1 Service top drive. Cut and slip drilling line. 04:30 - 06:30 2.00 DRILL P INT1 RIH with 5" DP to 12,036'. PU - 170K, SO - 135K. 06:30 - 07:30 1.00 DRILL P INT1 Circulate bottoms up, 525 gpm, 3,316 psi, 80 rpm. 07:30 - 08:00 0.50 DRILL P INT1 Downlink to the PowerDrive rotary steerable tool. Obtain ECD baseline - calculated 10.71 ppg. 08:00 - 00:00 16.00 DRILL P INT1 Dir Drill 8.5" from 12,036' to 12,416'. PU - 232K, SO - 169K, Rot - 195K, TO on - 11 K, TO off - 10K, 3300psi, 580 gpm. Calc ECD - 11.7 ppg, Act ECD - 11.8 ppg. Weighted up to 10.9 ppg mud while drilling ahead. 2/17/2005 00:00 - 09:30 9.50 DRILL P INT1 Dir Drill 8.5" from 12,416' to 12,629'. PU - 245K, SO - 160K, Rot - 190K, TO on - 14K, TO off - 13K, 3100psi, 540 gpm. Calc ECD - 11.51 ppg, Act ECD - 11.59 ppg. 09:30 - 11 :30 2.00 DRILL P INT1 Down link to the PowerDrive tool to position it in neutral. Pump a hi-visc sweep surface-to-surface @ 130 rpm, 570 gpm and 3,360 psi. Monitor well - stable. 11 :30 - 19:30 8.00 DRILL P INT1 POH from 12,629' standing back 5" DP, 4" DP, HWDP and collars. LD MWD tools. Break out bit. Test RSS tool on surface - good. 8.5" RS161 Graded: 1/2/ BT / T / X III NO / PR 19:30 - 20:00 0.50 DRILL P INT1 Clean and clear the floor. 20:00 - 23:00 3.00 DRILL P INT1 MU BHA#5 - RSS w/ 8.5" HCM605 RR. PU new 6-3/4" PowerDrive tools and shallow test - good. MU bit and MWD. RIH with collars, HWDP and jars. Shallow test MWD - good test. BHA#5: 8.5" HCM605 RR, 6-3/4" PowerDrive Assy, 6-3/4" LWD/CDR, 6-3/4" MWD, NM Stab, 3 x NM flex collars, xo, Dailey jars, 1 x 5" HWDP, xo, 22 x 4" HWDP 23:00 - 00:00 1.00 DRILL P INT1 RIH with BHA#5 on 4" DP. 2/18/2005 00:00 - 03:00 3.00 DRILL P INT1 RIH w/5" DP to 9,163' 03:00 - 03:30 0.50 DRILL P INT1 Service Top Drive. 03:30 - 05:00 1.50 DRILL N RREP INT1 Troubleshoot and repair Top Drive throttle controls. 05:00 - 07:30 2.50 DRILL P INT1 RIH w/5" DP. Wash last stand to bottom - no fill. 07:30 - 12:00 4.50 DRILL P INT1 Dir Drill 8.5" from 12,629' to 12,780'. PU - 247K, SO - 162K, Rot - 198K, TO on - 17K, TO off - 15K, 3350 psi, 580 gpm. Printed: 3/22/2005 11: 12:01 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/18/2005 07:30 - 12:00 4.50 DRILL P INT1 Calc ECD - 11.61 ppg, Act ECD - 11.7 ppg. 12:00 - 00:00 12.00 DRILL P INT1 Dir Drill 8.5" from 12,780' to 13,252'. PU - 261 K, SO - 158K, Rot - 198K, TO on - 17K, TO off - 15K, 3400 psi, 565 gpm. Calc ECD - 11.54 ppg, Act ECD - 11.91 ppg. 2/19/2005 00:00 - 04:00 4.00 DRILL P INT1 Dir Drill 8.5" from 13,252' to 13,521. PU - 261 K, SO - 158K, Rot - 198K, TO on - 17K, TO off - 15K, 3400 psi, 565 gpm. Calc ECD - 11.54 ppg, Act ECD - 11.91 ppg. 04:00 - 05:00 1.00 DRILL P INT1 Circulate up samples for geology - 540 gpm, 125 rpm, 3300 psi. 05:00 - 06:30 1.50 DRILL P INT1 Drill ahead an additional 10' TVD. Circulate up samples for geology - 540 gpm, 125 rpm, 3300 psi. TO @ 13,536' MD/9,600' rvD 06:30 - 08:00 1.50 DRILL P INT1 Circulate high vise sweep. Circulate and condition mud for trip out of the hole. 08:00 - 12:00 4.00 DRILL P INT1 POH from 13,536' to 13,050'. Backream through tight spots from 13,050' to 12,750'. Circulate hole clean. POH from 12,750' to 11,815'. 12:00 - 13:00 1.00 DRILL P INT1 Run back to bottom. No problems. 13:00 - 14:00 1.00 DRILL P INT1 Circulate bottoms up. 14:00 - 22:00 8.00 DRILL P INT1 POH standing back 5" and 4" DP. 22:00 - 23:30 1.50 DRILL P INT1 LD BHA#5. 6-1/8" HCM605 graded: 1/1/ WT / A I X II/ NO I TD 23:30 - 00:00 0.50 DRILL P INT1 Clean and clear the floor. 2/20/2005 00:00 - 01 :30 1.50 CASE P LNR1 RU 7" Liner running handling equipment. 01 :30 - 08:00 6.50 CASE P LNR1 PU 7" 26# L-80 BTC-m Liner using Best-o-life 2000 thread compound and torqued to -8800 ft-Ibs. RIH to 4,542'. Ran 105 joints of 7". All float equipment Bakerloc'd. 08:00 - 08:30 0.50 CASE P LNR1 RD 7" handling equipment. 08:30 - 09:30 1.00 CASE P LNR1 Circulate a liner volume @ 4 bpm, 400 psi. 09:30 - 14:00 4.50 CASE P LNR1 RIH with the 7" Liner on 4" DP to 8,922'. Fill pipe every 10 stands. 14:00 - 15:00 1.00 CASE P LNR1 Circulate 1.5 times the liner volume @ 6 bpm, 780 psi. 15:00 - 19:00 4.00 CASE P LNR1 RIH with 7" liner on 5" DP from 8,922' to 13,024'. PU - 185K, SO - 130K prior to exiting the window. 19:00 - 22:00 3.00 CASE P LNR1 Started to take weight @ 13,024'. Attempted to work past. PU - 300K, SO - 150K. Unable to work past. MU top drive and wash the last 5 stands to bottom with 2 bpm, 550 psi. MU cement head. TOL @ 9002' TZXP Packer @ 9002' ( 11.61' Tieback) THMC Hgr @ 9020' Landing Collar @ 13450' Float Collar @ 13492' Float Shoe @ 13534' TO @ 13537' 22:00 - 00:00 2.00 CEMT P LNR1 Break circulation. Stage up the pumps to 6 bpm while conditioning the mud and cleaning up the hole 2/21/2005 00:00 - 00:30 0.50 CEMT P LNR1 Continue to circulate hole clean @ 6 bpm, 1,125 psi. Prime up the cement unit and hold PJSM while circulating. Total of 1.5 bottoms up circulated prior to cement job. Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/21/2005 00:30 - 02:15 1.75 CEMT P LNR1 RU Schlumberger Cementers. Pump 3 bbls of spacer ahead. Shut Down and test lines to 4,500 psi. Bleed pressure. Mix 11.5 ppg Mudpush Spacer. Pump remaining 22 bbls 11.5 ppg Spacer @ 4 bpm, 650 psi initial, 550 psi final. Shut down. Mix 15.8 ppg Slurry. Pump 38 bbls 15.8 ppg Class G + adds Tail Slurry @ 3.6 bpm, 500 psi initial, 200 psi final. Shut down. Drop Dart. Start Displacement with Rig using 10.9 ppg mud @ 6 bpm, 665 psi initial. Catch falling cement @ 10 bbls into displacement At 106 bbls displacement, slow rate to 2 bpm to pick up plug Observe dart latch into plug @ 118 bbls displacement pumped. Increase rate to 6 bpm and continue displacement. Drop rate to 3 bpm to bump the plug - final pressure prior to bump was 900 psi. Bump plug @ 294 bbls pumped with 3500 psi to set hanger and hold for 5 minutes - pressure holding. SO 25K. Bleed off pressure and check floats - holding. CIP @ 0210 hours 2/21/2004. Observed good lift pressure and return flow line indication throughout the entire job. 02:15 - 02:30 0.25 CASE P LNR1 Rotate 15 turns to the right to release from the HMC hanger. PU out of the top of the hanger and verify liner released, PU - 170K. With 23 rpm, set down on top of the ZXP liner top packer. At 35K down weight, observed the pins shearing to set the packer. Shut off the rotary and set down 50K down weight twice to ensure set. 02:30 - 05:00 2.50 CASE P LNR1 Pull liner running tools fully out of the liner top while applying 1,000 psi. Observe the pressure drop off as we pulled. Circulate on top of the liner. RD cement head. 05:00 - 07:00 2.00 CASE P LNR1 Slip and cut drilling line. Clean under draw works. Check crown-o-matic. 07:00 - 13:00 6.00 CASE LNR1 POH with 5" DP x 4" DP tapered string. LD running tool 13:00 - 13:30 0.50 CASE LNR1 Clean and clear the rig floor. 13:30 - 14:30 1.00 CASE LNR1 Flush stack and pull the wear ring. 14:30 - 20:00 5.50 BOPSU LNR1 PJSM. Test BOP's and all related equipment to 250 psi/4,OOOpsi and the Annular Preventer to 250 psi/3,500 psi. All equipment tested without failures. Testing was witnessed by Jeff Jones of the AOGCC, Jeff Cutler and James Franks with BP, and Chris Clemens and Doug Withers of Nabors. 20:00 - 21 :00 1.00 BOPSU LNR1 Install wear ring and RD testing equipment. 21 :00 - 00:00 3.00 DRILL PROD1 MU BHA#6: 6-1/8" Pilot Hole BHA. Download and shallow test MWD - good. BHA#6: 6-1/8" Smith XR20D2TD2, motor, bypass sub, NM collar, NM stabilizer, MWD/LWD, ADN, 2 x NM flex collar, circ sub, xo, jars, 21 x hwdp 2/22/2005 00:00 - 04:00 4.00 DRILL P PROD1 RIH w/ BHA#6 picking up 4" DP to 4,020'. Fill pipe every 10 Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/22/2005 00:00 - 04:00 4.00 DRILL P PROD1 stands. 04:00 - 05:30 1.50 DRILL P PROD1 RIH w/BHA#6 on 4" DP from the derrick. Fill pipe every 10 stands. 05:30 - 08:00 2.50 DRILL P PROD1 RIH w/BHA#6 on 5" DP from the derrick. Fill pipe every 5 stands. 08:00 - 08:30 0.50 DRILL P PROD1 Wash down from 13,293'. Drill cement stringers to 13,433' 08:30 - 09:30 1.00 CASE P LNR1 Pressure test the 9-5/8" x 7" to 4,000 psi. Chart and hold for 30 minutes - good test. 09:30 - 13:30 4.00 DRILL P PROD1 Drill cement stringers to the top of the landing collar @ 13,450'. Drill landing collar. Wash down to the top of the float collar @ 13,491' - no cement. Drill float collar. Wash down to the top of the float shoe @ 13,532' - no cement. Note: Derrick inspection performed @ 1200 hrs. 13:30 - 17:00 3.50 DRILL P PROD1 Dilute the 10.9 ppg LSND used to drill the intermediate liner down to 10.2 ppg. Circulate and condition the mud @ 300 gpm, 2440 psi, 60 rpm. 17:00 - 18:00 1.00 DRILL P PROD1 Drill out float shoe. Pull back into the shoe and monitor the well. A slight initial flow was seen and then stopped. Drill 20' of new formation to 13,557'. 18:00 - 19:00 1.00 DRILL P PROD1 Circulate the hole clean - 330 gpm, 2575 psi, 80 rpm, TO - 12K. 19:00 - 19:30 0.50 DRILL P PROD1 Perform FIT with the 10.2 ppg LSND mud and 900 psi at the surface for a 12.0 ppg EMW @ 9,600' TVD. Note: The FIT tracked the casing test until 320 psi surface pressure at -20 psi/stroke. Once 320 psi was reached, the surface pressure then changed at -10 psi/stroke until the 900 psi was reached. Pressure then declined to -700 psi in 5 minutes where it held for 5 more minutes to the end of the test. 19:30 - 00:00 4.50 DRILL P PROD1 Drill ahead from 13,557' to 13,641'. PU - 232, SO - 163, ROT - 193, 330 gpm, 2650 psi, 80 rpm, TO on - 11 K, TO off - 9K. ART - 3.34. 2/23/2005 00:00 - 12:00 12.00 DRILL P PROD1 Drill ahead from 13,641' to 13,806'. PU - 265, SO - 135, ROT - 193, 330 gpm, 2650 psi, 80 rpm, TO on - 13K, TO off - 11 K. 12:00 - 00:00 12.00 DRILL P PROD1 Drill ahead from 13,806' to 13,908. PU - 240, SO - 160, ROT- 199,330 gpm, 2650 psi, 80 rpm, TO on - 12K, TO off - 10K. 2/24/2005 00:00 - 09:00 9.00 DRILL P PROD1 Drill ahead from 13,908' to 14,008'. PU - 250, SO - 170, ROT- 199, 330 gpm, 2650 psi, 80 rpm, TO on - 13K, TO off - 11 K. AST -7.84 09:00 - 09:30 0.50 DRILL P PROD1 POH wI 5" DP from 14,008' to 13,388'. 09:30 - 10:00 0.50 DRILL P PROD1 Drop ball and shear out circ sub w/2,400 psi. Pump dry job. 10:00 - 12:30 2.50 DRILL P PROD1 POH w/5" DP to 9,157' - positioning the circ sub across at the top of the 7" liner @ 9,002'. No significant amount of additional solids seen in the returns. 12:30 - 13:30 1.00 DRILL P PROD1 Circulate a high visc sweep from surface to surface to clean the 9-5/8" casing above the 7" liner top - 540 gpm, 2,760 psi. 13:30 - 17:00 3.50 DRILL P PROD1 Monitor the well - stable. Pump dry job. POH w/ 5" x 4" DP to 1 ,400' 17:00 - 18:30 1.50 DRILL P PROD1 Rig crew found a 3/4" nut on the rig floor. The rig was shut down and the top drive and derrick were inspected. Found a nylock nut missing from a keeper bolt. Replaced all nylock nuts on all keeper bolts. Printed: 3/22/2005 11: 12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/2412005 18:30 - 19:30 1.00 DRILL P PROD1 POH from 1 ,400' to top of the BHA @ 836'. 19:30 - 21 :00 1.50 DRILL P PROD1 PJSM. LD BHA#6. LD jars and flex collars. Download ADN nuclear source and LD ADN. LD MWD/LWD, nm stabilizer, .nm drill collar, motor and bit. 6-1/8" Smith XR20D2TD2 graded: 3/4/ WT / A / E /1/ BT / HR Note: Found the 8/32" jet on the motor bypass sub washed out. Also, the flapper on the float was missing. 21 :00 - 23:30 2.50 DRILL P PROD1 MU BHA#7: 6-1/8" Pilot Hole BHA #2. MU new 6-1/8" bit, motor bypass sub and ADN. Load nuclear source. Shallow test MWD/LWD - good. BHA#7: 6-1/8" Hughes MX20DX, motor, bypass sub, NM collar, NM stabilizer, MWD/LWD, ADN, 2 x NM flex collar, circ sub, XO, jars, 21 x hwdp 23:30 - 00:00 0.50 DRILL P PROD1 Service the top drive and the crown. . 2/25/2005 00:00 - 03: 15 3.25 DRILL P PROD1 RIH w/BHA#7 on 4" DP from 832' to 7,938'. Fill pipe every 3,000'. Performed derrick inspection @ 0000 hours 03:15 - 05:30 2.25 DRILL P PROD1 RIH w/BHA#7 on 5" DP from 7,938' to the 7" liner shoe. Fill pipe every 3,000'. 05:30 - 06:00 0.50 DRILL P PROD1 Lubricate and service the rig. 06:00 - 10:00 4.00 DRILL N RREP PROD1 Rebuild funnel top and adjust flow for the return line on the electric-magnetic braking system. 10:00 - 11 :00 1.00 DRILL P PROD1 Cut and slip drilling line. 11 :00 - 13:00 2.00 DRILL P PROD1 Circulate EP Mud Lube sweep from surface to surface - 330 gpm, 2,770 psi. Notes: Without pumps on: Prior to pumping lubricant sweep, PU - 250K, SO - 161 K. After pumping lubricant sweep, PU - 240K, SO - 172K. With pumps on at 300 gpm and 70 rpm: Prior to pumping lubricant sweep, PU - 235K, SO - 156K, TO - 10.5K. After pumping lubricant sweep, PU - 230K, SO - 161K, TO - 10K. Performed derrick inspection @ 1200 hours 13:00 - 14:00 1.00 DRILL P PROD1 RIH from 13,383' to 13,950'. Precautionary wash and ream from 13,950' to 14,008'. 14:00 - 21 :30 7.50 DRILL P PROD1 Drill from 14,008' to 14,189' - TD. PU - 248K, SO - 163K, ROT - 190K, 313 gpm, 2,675 psi, TO on - 13K, TO off - 11 K, 75 rpm. 21 :30 - 22:30 1.00 DRILL C PROD1 Circulate a bottoms up for geologist to verify penetration of Kavik shale - 310 gpm, 2670 psi. 22:30 - 00:00 1.50 DRILL C PROD1 MAD pass from 14,189' to 14,046' at less than 200'/hr. 2/26/2005 00:00 - 05:00 5.00 DRILL C PROD1 MAD pass from 14,046' to 13,384' at less than 200'/hr. Perform derrick inspection @ 0000 05:00 - 05:30 0.50 DRILL P PROD1 Service Top Drive. Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/26/2005 05:30 - 06:00 0.50 DRILL C PROD1 RIH from 13,384' to 14,189' Precautionary wash last stand to bottom - no fill. PU - 252K, SO - 168K. 06:00 - 08:00 2.00 DRILL P PROD1 Circulate a high vise sweep from surface to surface - no additional cuttings circulated to surface. 330 gpm, 2,200 psi, 100 rpm, TQ -14K. 08:00 - 09:00 1.00 DRILL P PROD1 Monitor the well - stable. POH from 14,189' to 13,383'. PU- 261 K, SO - 177K. 09:00 - 10:00 1.00 DRILL P PROD1 Drop dart and open up the circ sub. Pump dry job and drop 2-3/8" rabbit. 10:00 - 15:30 5.50 DRILL P PROD1 Monitor the well- stable. POH standing back 5" DP, 4" DP and 4" HWDP from 13,383' to 188'. Rabbit found on the top of the jars. 15:30 - 17:30 2.00 DRILL P PROD1 LD jars, circ sub and nm flex collars. Clear floor of all personnel and hold PJSM to remove source from ADN. Schlumberger personnel pulled and secured nuclear source from the ADN tool. LD ADN, MWD, nm stab, nm collar, bypass sub, motor and bit. 6-1/8" Hughes MX20DX graded: 1/1/ WT / A / E /1/ ER / TO Note: Both bypass sub jets washed out. 17:30 - 18:00 0.50 DRILL P PROD1 Clean and clear the rig floor. 18:00 - 20:00 2.00 EVAL C PROD1 Hold PJSM. MU Schlumberger 5" MDT logging tool to 54'. Plug in the MDT logging tool to the e-line and test - good. 5" MDT logging tool: pressure sampling sub, hydraulic sub, 2 x sample chambers, power coupling, GR, telemetry sub, tension sub, wet connect. 20:00 - 00:00 4.00 EVAL C PROD1 RIH w/5" MDT on 4" HWDP and 4" DP. Fill pipe every 3,000'. 2/27/2005 00:00 - 01 :15 1.25 EVAL C PROD1 RIH w/5" MDT on 4" HWDP and 4" DP to 7,795'. Fill pipe every 3,000'. Perform derrick inspection @ 0000 01 :15 - 04:30 3.25 EVAL C PROD1 RIH w/5" MDT on 5" from 7,795'. Fill pipe every 3,000' 04:30 - 17:30 13.00 EVAL C PROD1 PJSM. RU SLB E-line side entry sub and tie into wet connect. Log the 6-1/8" pilot hole from 13,553' to 14,133' taking 44 pressure samples and 2 fluid samples while RIH. Note: 43 of 44 pressure samples successful. Based on the MDT pressure samples,formation pressure is 4,461 psi @ 9,959' TVDrkb @ TZ2A 1. Perform derrick inspection @ 1200 17:30 - 20:30 3.00 EVAL C PROD1 POH to 14,002' and take fluid sample #1. RIH to 14,012' and take fluid sample #2. 20:30 - 21 :30 1.00 EVAL C PROD1 POH to 13,225'. Remove wireline clamp. 21 :30 - 22:30 1.00 EVAL C PROD1 POH with wireline. 22:30 - 23:30 1.00 EVAL C PROD1 LD side entry sub, RD wireline sheave and remove from rig floor. 23:30 - 00:00 0.50 EVAL C PROD1 Pump dry job and POH standing back 5" DP. 2/28/2005 00:00 - 02:30 2.50 EVAL C PROD1 POH from 13,225' to 7,795 standing back 5" DP. Derrick inspection @ 0000 Printed: 3/22/2005 11:12:01 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 2/28/2005 02:30 - 06:00 3.50 EVAL C PROD1 POH from 7,795' to the top of the MDT tool assembly at 54' standing back 4" DP and 4" HWDP. 06:00 - 07:30 1.50 EVAL C PROD1 LD Schlumberger 5" MDT tool assembly. 07:30 - 12:30 5.00 EVAL C PROD1 Slip and cut 1200' of drilling line to spool new line. Torque the dead man and install the guards on the drawworks. Check the crown-o-matic. 12:30 - 16:30 4.00 PXA P ABAN PJSM. PU 3-1/2" tubing handling equipment. PU 3-1/2", 9.2#, L-80, NSCT cement stinger to 1,565'. Torque to 2,890'. RD tubing handling equipment. 16:30 - 22:00 5.50 PXA P ABAN RIH w/4" DP to 8,662'. RIH w/4" HWDP to 9,326'. RIH with 5" DP to 13,553'. Fill pipe every 3,000'. 22:00 - 22:30 0.50 PXA P ABAN Circulate and fill the pipe at the shoe. 22:30 - 23:00 0.50 PXA P ABAN RIH w/5". Precautionary wash last stand to bottom and tag bottom @ 14,189' - no appreciable solids seen at surface. PU - 225K, SO - 150K. 23:00 - 00:00 1.00 PXA P ABAN Attempted to LD a single and screw in a 5' pup, a TIW valve and a 10' pup to for the cement job after washing last stand down. When the 5" single was unthreaded, fluid came up the drill pipe. The single joint of 5" was laid down and the top drive was reconnected. A bottoms up was circulated from the well and the mud conditioned - 330 gpm, 2,040 psi. We suspected an underbalance compared to the backside due to the hydrostatic pressures seen during the MDT of -10.5 ppg. The problem was confirmed by taking mud weight samples from the well which at times weighed 10.6 ppg. 3/1/2005 00:00 - 00:30 0.50 PXA P ABAN Disconnect the top drive - well stable. RU 10' pup, TIW, and 5' pup. RU head pin and cement hose. PU - 250K. 00:30-01:15 0.75 PXA P ABAN Hold PJSM for the cement plug. Start batch mixing the 17ppg Class G cement after the meeting. Continue circulation until cement is up to weight. 01:15 - 02:15 1.00 PXA P ABAN Cement to weight at 17ppg. Pump 5 bbls of water ahead. Shut down and pressure test to 3,500 psi - good test. Pump remaining 10 bbls of the water ahead. Switch to 17ppg Class G cement and pump 35 bbls at 4.8 bpm, 1080 psi initial, 667 psi final. Switch to water behind and pump 5 bbls. Swap to the rig and displace with 10.2 ppg used LSND drilling fluid. Catch the cement @ 7 bbls pumped. Displaced cement @ 6 bpm and 770 psi initial pressure. At 117 bbls pumped, set pipe on bottom and slowed rate to 4 bpm. As cement went around the shoe, slowed rate to 2 bpm. Pressure increased to 400 psi at 156 bbls pumped. Shut down to ensure plug would be under displaced. Opened up a valve on the tee off of the head pin to verify plug was under displaced. CIP @ 02053/1/2005. Pipe was reciprocated until water was at the shoe. LD head pin and cement lines. LD 5' pup, TIW and 10' pup. 02:15 - 03:15 1.00 PXA P ABAN PU single. Stand back 9 stands of 5" DP pulling out of the hole @ 22'/min to 13,368' without tight spots or problems. 03:15 - 05:00 1.75 PXA P ABAN Drop DP wiper dart and circulate bottoms up - staging up to 8.5 bpm, 1,700 psi. without losses, no cement to surface. 05:00 - 09:30 4.50 PXA P ABAN Monitor well, pump dry job and POH with 5" DP. 09:30 - 10:00 0.50 PXA P ABAN Adjust topdrive service loop. Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 3/112005 10:00 - 11 :00 1.00 PXA P ABAN Continue POH to 1,565' 11 :00 - 11 :30 0.50 PXA P ABAN Rig up tubing tongs and handling equipment. 11 :30 - 14:30 3.00 PXA P ABAN Lay down 50 jts 3.5" tubing and plug catcher. 14:30 - 15:30 1.00 PXA P ABAN Rig down tubing handling equipment, clear floor of casing tools, clean floor. 15:30 - 17:30 2.00 STKOH P PROD1 Make up BHA #8, Hughes MX20DX, mud motor, NM lead collar, MWD/LWD, orient motor & MWD, held PJSM and load sources, pickup remaining BHA. 17:30 - 18:30 1.00 STKOH P PROD1 RIH to 846' test MWD, 260 gpm @ 1135 psi, ok 18:30 - 00:00 5.50 STKOH P PROD1 RIH with BHA #8 from 846', fill DP @ 5,237',8968', tag top of cement @ 13,380' 3/212005 00:00 - 04:00 4.00 STKOH P PROD1 Drill cement from 13,380' to 13,555, 280 gpm, 2285 psi, 50 rpm, torque 10.5k, 1 0-13k wob, 50-80 fph. Up wt = 225k, dn wt = 165k, rt wt = 190k. 04:00 - 10:00 6.00 DRILL P PROD1 Time drill off cement plug,from 13,555' to 13,575',2 fph for the first 5', then 5-10 fph for the next 15' holding a high side toolface, continue sliding to 13,604', 275 gpm, 1950 psi. AST = 4.67 hrs. 10:00 - 12:00 2.00 DRILL P PROD1 Displace well over to 9.2 ppg Flo-Pro, 280 gpm, 2,210 psi. 12:00 - 00:00 12.00 DRILL P PROD1 Directional drill 6.125" from 13,604' to 13,790' 5-20k wob, 280 gpm, 2020 psi on bottom, 1950 psi off bottom, up wt = 226k, dn wt = 170k, st wt = 190k, sliding 100% to achieve required build rates. AST = 9.14 hrs. 3/3/2005 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill 6.125" from 13,790' to 14,137' 5-20k wob, 280 gpm, 2100 psi on bottom, 1900 psi off bottom, up wt = 238k, dn wt = 172k, st wt = 200k. AST = 7.01 ART = 1.07 12:00 -22:45 10.75 DRILL P PROD1 Directional drill 6.125" from 14,137' to 14,517' 15-25k wob, 280 gpm, 2100 psi on bottom, 1900 psi off bottom, 60 rpm, torque on bottom 10Ak, maintain lubricant concentration @ 4% with lubetex, up wt = 240k, dn wt = 170k, st wt = 200k. AST = 7.28 hrs. ART = 1.41 hrs. 22:45 - 00:00 1.25 DRILL P PROD1 Circulate hole clean, pump 25 bbl high vis sweep, pumping 280 gpm, 2070 psi, rotating string 80 rpm, torque 9k 3/4/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Continue circulating sweep around, at 280 gpm, 2070 psi, 80 rpm, torque 9k, reciprocate string full stand, no increase in cuttings when sweep camp back. 01 :30 - 02:30 1.00 DRILL P PROD1 Monitor well, blow down topdrive, POH 10 stds to shoe, no problem pulling to shoe. 02:30 - 03:00 0.50 DRILL P PROD1 Monitor well, pump dry job, blow down tiopdrive. 03:00 - 05:30 2.50 DRILL P PROD1 POH with drilling assembly, to 7" liner top, drop ball, open circ sub. 05:30 - 10:30 5.00 DRILL P PROD1 Position circ sub in 7" tie back extension wash tie back area, pumping 525 gpm, 1,695 psi, rotating string 10-15 rpm. Pulled above liner top @ 9,002' circulate bottoms up @ 525 gpm, 1695 psi rotating @ 80 rpm, first bottoms up brought back a considerable amount of cuttings and calcium carbonate, shakers are not cleaning up, pumped 25 bbl high vis sweep, cuttings size and amount increased as sweep came back, still seeing some calcium carbonate and cuttings circulate 1/2 bottoms up before shakers cleaned up. recovered sample Geologist confirmed sample 60% cuttings 40% calcium carbonate. 10:30 - 12:00 1.50 DRILL P PROD1 POH from 8,990' to 5,885', change over to 4" handling Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 3/412005 10:30 - 12:00 1.50 DRILL P PROD1 equipment. 12:00 - 14:30 2.50 DRILL P PROD1 POH from 5,885', to BHA, monitor well, stand back 4" HW, jars and flex collars. 14:30 - 15:30 1.00 DRILL PROD1 PJSM, Lay down MWD, stab, lead collar, motor and bit. 15:30 - 16:00 0.50 DRILL PROD1 Clean floor. 16:00 - 17:00 1.00 DRILL PROD1 Pull wear ring, install test plug, rig up BOP test equipment. 17:00 - 20:00 3.00 BOPSU PROD1 Test BOPs to 250 psi low, 4000 psi high per Nabors testing procedure, all equipment tested to 4,000 psi, no failures, John Crisp with AOGCC waived witness of BOP test. BOP test was witnessed by WSL Alan Madsen, Brian Buzby Nabors Toolpushers William Bixby, Kelly Cozby. 20:00 - 20:30 0.50 BOPSU PROD1 Pull test plug, install wear ring, rig down test equipment. 20:30 - 23:00 2.50 DRILL PROD1 PJSM, Pick up BHA #9 per directional driller, shallow test RSS, pickup remaining BHA. 23:00 - 00:00 1.00 DRILL P PROD1 Pickup 66 joints 4" DP from shed. 3/5/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Continue picking up 66 joints 4" DP from shed, Test MWD @ 1,000',275 gpm, 1,000 psi. ok. 01 :30 - 07:30 6.00 DRILL P PROD1 RIH, to 10,300' filling DP as needed, chnage over to 5" handling equipment, continue RIH to 13,461'. 07:30 - 08:30 1.00 DRILL P PROD1 Slip and cut drilling line, inspect brakes. 08:30 - 09:30 1.00 DRILL P PROD1 RIH with RSS assembly from 13,461' took weight at 13,760', worked string down to 13,804' 30k overpull, made up topdrive, break circulation. 09:30 - 12:00 2.50 DRILL P PROD1 Ream from 13,804' to 14,517', 254 gpm, 1923 psi, 80 rpm, torque 8.5k off bottom, up wt = 245k, dn wt = 160k, rt wt = 200k. Rotary torque flaging from 11 to 14k, wob 0 to 20k, while reaming build section. 12:00 - 16:00 4.00 DRILL P PROD1 Directional drill 6.125" hole with RSS from 14,517' to 14,805', wob 15k, 275 gpm, 2,195 psi on bottom, 2,10 psi off bottom, 120 rpm, torque 14.5k on bottom, 13.8k off bottom. RSS not responding to down link commands, Control collar not communicating with MWD. Not able to achieve required turn rate. 16:00 - 18:00 2.00 DRILL P PROD1 Pump 30 bbl high vis sweep, at 280 gpm, 2270 psi, rotating 130 rpm, 13.8K torque, no increase in cuttings at bottoms up, circulated an additional 200 bbls till shakers cleaned up. 18:00 - 20:00 2.00 DRILL P PROD1 Monitor well, POH from 14,805', pulled tight at 13,822', attempt to work with out pumping, 25k overpull, no progress, Made up topdrive, backream from 13,822' to 13,744',275 gpm, 2,100 psi, 90 rpm, 11.5k torque, saw nothing while backreaming, shut down pumps, worked back down to 13,822' with no pump, no problems. continue POH to 13,456' 20:00 - 21 :00 1.00 DRILL P PROD1 Drop ball and open circ sub, pump liner volume with 505 gpm, 2450 psi, rotating 100 rpm. 21 :00 - 23:30 2.50 DRILL P PROD1 POH from 13,456 to 9,150' 23:30 - 00:00 0.50 DRILL P PROD1 Position circ sub at liner top wash tie back extension, 502 gpm, 1880 psi. 3/6/2005 00:00 - 02:00 2.00 DRILL P PROD1 Circulate 30 bbl high vis sweep, working circ sub from 9,000' to 8904',505 gpm, 1880 psi, rotating string 120 rpm, torque 4.5k, the amount of cuttings doubled as sweep came back. 50 % Calcium carbonate, cutting size also increased after sweep was out of the hole. POH to a bit depth of 8,952' circulate an additional 1.5 bottoms up before shakers cleaned up, pumping Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 3/6/2005 00:00 - 02:00 2.00 DRILL P PROD1 535 gpm, 1950 psi rotating string 130 rpm, 4.5K torque, screened down to 140 on # one shaker to handle increased flow. 02:00 - 06:00 4.00 DRILL P PROD1 Monitor well, pump dry job, POH from 8,952' to 2879' 06:00 - 08:00 2.00 DRILL P PROD1 POH lay down 63 joints of 4" DP, stand back jars and flex collars. 08:00 - 09:30 1.50 DRILL P PROD1 PJSM, Flow test RSS and MWD, lay down MWD, break bit, lay down RSS. 09:30 - 10:00 0.50 DRILL P PROD1 Clean Floor. 10:00 - 12:00 2.00 DRILL P PROD1 Pickup bit, motor and MWD, orient, PJSM, load sources, pickup remaning BHA, shalllow test MWD. 260 gpm, 1,025 psi. 12:00 - 20:00 8.00 DRILL P PROD1 Pickup 63 joints 4" DP from shed, continue to RIH to 10,361', change over to 5" handling equipment, RIH from 10,361 to 14,710 filling DP every 3,000' 20:00 - 20:30 0.50 DRILL P PROD1 Makeup topdrive, ream last stand to bottom from 14,710' to 14,805, 260 gpm, 1950 psi, 60 rpm, torque 13.5k. 20:30 - 00:00 3.50 DRILL P PROD1 Drill 6.125" production hole from 14,805' to 14,880, by sliding, 5-15k wob, 275 gpm, 2,250 psi on bottom, 2,010' psi off bottom, up wt = 238k, dn wt = 165k, rt wt = 197k. AST = 2 hrs. 3/7/2005 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6.125" production hole from 14,880' to 15,441', 5-15k wob, 265 gpm, 2,380 psi on bottom, 2,020' psi off bottom, 65 rpm, torque on bottom 10.5k, torque off bottom 9.5k, added 290 bbls fresh 9.3 ppg flo-pro with 2% lubes to system, AIM quit working at 14,900', up wt = 238k, dn wt = 165k, rt wt = 197k. AST = 7.2 hrs. ART = .34 hrs 12:00 - 00:00 12.00 DRILL P PROD1 Drill 6.125" production hole from 15,441' to 16,027', 5-15k wob, 270 gpm, 2,370 psi on bottom, 2,250' psi off bottom, 60 rpm, torque on bottom 12k, torque off bottom 9.5k, pumped 25 bbl high vis sweeps at 15,600' and 15,907', had slight increase in cuttings on both sweeps. up wt = 240k, dn wt = 161 k, rt wt = 198k. AST = 3.78 hrs. ART = 2.88 hrs 3/8/2005 00:00 - 13:00 13.00 DRILL P PROD1 Drill 6.125" production hole from 16,027' to 16,729', 5-15k wob, 280 gpm, 2,650 psi on bottom, 2,230' psi off bottom, 60 rpm, torque on bottom 13k, torque off bottom 10k, pumped 25 bbl high vis sweeps at 16,195, no increase in cuttings when sweep came back. up wt = 248k, dn wt = 158k, rt wt = 198k. AST = 3.15 hrs. ART = 5.27 hrs 13:00 - 16:00 3.00 DRILL P PROD1 Pump 30 bbl high vis sweep, 275 gpm, 2,440 psi, 80 rpm, torque 12k. (Currently in phase 2 driving conditions) 16:00 - 22:00 6.00 EVAL P PROD1 Perform MAD pass from 16,765' to 15,255' @ +/- 700 fph, 1 sample perlft, pumping 270 gpm 2270 psi, 60 rpm, torque 12k. Suspend current operations, due to weather conditions, phase 3 was declared @ 22:00 hrs. 22:00 - 23:30 1.50 DRILL N WAIT PROD1 POH from 15,255' to 13.463' 23:30 - 00:00 0.50 DRILL N WAIT PROD1 Install safety valve, circulae across top of the hole, Wait on weather. Losses for last 12 hrs = 23 bbls 3/9/2005 00:00 - 16:00 16.00 DRILL N WAIT PROD1 Wait on Weather, currently in phase 3 driving conditions. Circulate across top of hole. Remove snow from door and walkways, prepair to RIH. Arranged for crew change thru IMT @ 13:00 hrs, bus transportation escorted with heavy equipment. Road conditions down graded to phase 2 @ 16:00 Printed: 3/22/2005 11 :12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 3/9/2005 00:00 - 16:00 16.00 DRILL N WAIT PROD1 hrs. 16:00 - 17:00 1.00 DRILL N WAIT PROD1 RIH from 13,463' to 15,349' 17:00 - 00:00 7.00 EVAL P PROD1 Continue MAD pass from 15,255' to 13,534', 280 gpm,2280 psi, 60 rpm, torque 10.5k, up wt = 248k, dn wt 158k, rt wt 198k. 3/10/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Slip and cut drilling line, inspect brakes, service rig. 01 :30 - 03:30 2.00 DRILL P PROD1 RIH from 13,354' to 16,670' 03:30 - 07:00 3.50 DRILL P PROD1 Make up topdrive ream last stand to bottom from 16,670' to 16,765', pump 25 bbl high vis sweep, pumping 280 gpm, 2365 psi, 100 rpm, torque 12.5k to 14k, up wt 248 k dn wt 158k, rt wt 198k, slight increase in cuttings as sweep came back, circulate until shakers are clean. 07:00 - 09:00 2.00 DRILL N WAIT SURE Suspend operations due to weather, Phase 3, Circulate at 2 bpm, 945 psi, reciprocate pipe 30' off bottom, holding a high side toolface. 09:00 - 10:30 1.50 DRILL P PROD1 Spot 150 bbl 9.3 ppg 4% lubetex liner running pill, 245 gpm, 2250 psi, rotating 100 rpm, torque 15.5k 10:30 - 14:00 3.50 DRILL P PROD1 Monitor well, POH from 16,765' to 13,534' 14:00 - 15:00 1.00 DRILL P PROD1 Drop ball shear open circ sub, pump dry job. 15:00 - 18:00 3.00 DRILL P PROD1 POH from 13,534' to 12,906, lay down 78 jts of 5" DP 18:00 - 19:00 1.00 DRILL P PROD1 Change top drive saver sub and bell guide to 4" 19:00 - 20:00 1.00 DRILL P PROD1 POH to 9,253' 20:00 - 00:00 4.00 DRILL P PROD1 POH back ream up from 9,253' bit depth (circ sub @ 9,094'), 520 gpm 1,800 psi 11 rpm, work circ sub thru tie back area several times, continue back reaming up slowly until bit is above liner top, losing mud over shakers at bottoms up ( 1" deep Across screens) 90% clacium carbonate, shut down pumps, screen down #2 & #3 shakers, to 140 & 110, continue back reaming to 8970'. Reduce rate to 300 gpm, cuttings tank is full, snow blower is escorting 2 super suckers and water truck to location, phase 2 on main roads level 3 on access roads and pads. 3/11/2005 00:00 - 02:30 2.50 DRILL P PROD1 Guzzlers arrived on location, Resume back reaming out slowly from 8,970' to 8,776', 587 gpm, 2005 psi, rotating 120 rpm, torque 4.5k after 3 bottoms up still getting a significant amount of cuttings, 50% calcium carconate, 50% drill cuttings, pumped 25 bbl high vis weighted sweep and circulate until shakers cleaned up, monitor well, pump dry job. 02:30 - 04:00 1.50 DRILL P PROD1 POH from 8,776' to 5,963' 04:00 - 05:00 1.00 DRILL P PROD1 Lay down 21 joints of 4" HWDP. 05:00 - 07:00 2.00 DRILL P PROD1 Continue POH standing back 4" DP. 07:00 - 09:00 2.00 DRILL P PROD1 Lay down BHA # 10, per directional driller. 09:00 - 09:30 0.50 DRILL P PROD1 Clear floor of all directional tools, clean floor. 09:30 - 10:30 1.00 DRILL P PROD1 Change out topdrive saver sub and bell guide from 4" to 5". 10:30 - 11 :30 1.00 CASE P PROD1 Rig up to run 4.5" liner. 11 :30 - 12:00 0.50 CASE P PROD1 PJSM with Co Rep, Toolpusher and all rig personnel. 12:00 - 17:30 5.50 CASE P PROD1 Make up and check floats, Run 83 joints 4.5" 11.6# L-80 LTC 8rd liner per running order, make up torque 2,300 ftllbs, make up Baker ZXP liner top packer, rig down casing tools. 17:30 - 18:00 0.50 CASE P PROD1 Make up 1 stand of 4" DP, circulate liner volume (51 bbls), 170 gpm, 190 psi, up wt 75k, dn wt 70k 18:00 - 22:45 4.75 CASE P PROD1 RIH with 4.5" liner on 4" DP to 9,004' filling DP every 10 stands. 22:45 - 00:00 1.25 CASE P PROD1 Circulate bottoms up @ 9,004' 7 bpm, 540 psi. up wt 135k, dn Printed: 3/22/2005 11:12:01 AM legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPlETE NABORS ALASKA DRilLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 3/11/2005 22:45 - 00:00 1.25 CASE P PROD1 wt 11 Ok, small amount of calcium carbonate at bottoms up. 3/12/2005 00:00 - 03:00 3.00 CASE P PROD1 Blow down topdrive, continue running 4.5" 11.6# L-80 LTC 8rd liner on 4" DP to 12,922' filling DP every 10 stands. 03:00 - 03:30 0.50 CASE P PROD1 Change elevators to 5" make up first stand of 5" DP and run in Make up plug dropping head on top single and lay down on skate. 03:30 - 06:30 3.00 CASE P PROD1 Continue running 4.5" liner, no problems running liner in open hole, hole in good shape. 06:30 - 09:30 3.00 CEMT P PROD1 Make up cement head and circulating lines, break circulation, wash down tag bottom at 16,765' stage up pumps to 6 bpm, 1450 psi, reciprocate pipe, up wt = 237k, dn wt = 157k. PJSM with Cementers, Co Rep, Toolpusher and rig crew. 09:30 - 11 :30 2.00 CEMT P PROD1 Pump 5 bbls water and test lines to 4,500 psi, pump 15 bbls chemical wash, 25 bbls Mud-push weighted to 10.5 ppg @ 4.5 bpm, 1530 psi, pump 85 bbls 15.8 ppg class G cement @ 6 bpm, 1390 psi, final rate 6 bpm, 1100 psi, shut down and wash up thru tee, release DP dart and displace cement with 55 bbls of 9.3 ppg perf pill, followed by 9.3 ppg mud, slowed pumps to 3 bpm latched up liner wiper plug, sheared @ 1700 psi, reciprocate liner, 30 bbls from bumping plug set liner on bottom, bumped plug and pressure up to 4,000 psi to set liner hanger, held pressure for 5 min, bled off and check floats ok. CIP @ 11 :00 hrs, Set down 50k, to ensure hanger set. picked up to expose rotating dog sub, set down 70k with out rotating picked up off liner top, set down 30k while rotating 15 rpm, repeat several times to ensure packer is set, no visual indication that liner top packer set 11 :30 - 13:00 1.50 CEMT P PROD1 Pulled out of packoff seal nipple and circulate bottoms up @ 566 gpm, 2845 psi, estimate 5 bbls cement to surface, +/- 40 bbls of contaminated mud to surface. 13:00 - 15:00 2.00 CEMT P PROD1 Displace well over to 9.3 ppg brine @ 580 gpm 2900 psi. 15:00 - 16:00 1.00 CEMT P PROD1 Rig down circulating lines, lay down cement head on skate, blow down lines. 16:00 - 17:00 1.00 CEMT P PROD1 POH 5 stands, pickup cement head, make breaks and lay down. 17:00 - 18:30 1.50 CEMT P PROD1 POH to 9,620' 18:30 - 19:30 1.00 CEMT P PROD1 Cut drilling line, service rig 19:30 - 00:00 4.50 CEMT P PROD1 POH from 9,620' lay down Baker running tool, inspect running tool, shear ring on rotating dog sub sheared indicating enough weight was set down to sufficiently set packer. 3/13/2005 00:00 - 00:30 0.50 CASE P PROD1 Check 4.5" liner running tool, assure dog sub pins sheared. Make service breaks on running tool and lay down. 00:30 - 01 :00 0.50 CASE P PROD1 Pressure test 4.5" liner and packer to 4000 psi, OK. Test recorded on chart. 01 :00 - 01 :30 0.50 OTHCMP Clean and clear rig floor. Bring perf. tools to rig floor. 01 :30 - 06:30 5.00 OTHCMP PJSM with drill crew and perf crew. P/U 1052' of 2.5" loaded perf. guns @ 6 SPF and 70 joints of 2 1/16" CS Hydril tubing. 06:30 - 11 :30 5.00 OTHCMP RIH with drill pipe from derrick and perf assy. to 4.5" TOL @ 9002'. UWT = 185K, DWT = 125K. 11 :30 - 17:00 5.50 OTHCMP RIH to 16677'. UWT = 240K, DWT = 160K. 17:00 - 18:30 1.50 OTHCMP Perf guns on depth, pressure up down the drill pipe to 3000 psi and fire perf. guns. Perforated interval = 15504' to 15743', 15793' to 16396',16446' to 16556', 16576' to 16676'. Observe Printed: 3/22/2005 11:12:01 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: NK-38 NK-38A REENTER+COMPLETE NABORS ALASKA DRILLING I NABORS 9ES Start: 2/4/2005 Rig Release: 3/16/2005 Rig Number: Spud Date: 1/1/1995 End: 3/16/2005 well. Lost +- 14 bbl 9.3 ppg brine. POH 13 stands of drill pipe to 15504'. 18:30 - 20:00 1.50 OTHCMP Circulate surface to surface. Well stable. 20:00 - 00:00 4.00 OTHCMP Pump dry job, POH laying down drill pipe. 3/14/2005 00:00 - 07:30 7.50 OTHCMP POH, lay down 352 jts. of drill pipe after perforating 4.5" liner. Top perf @ 15504, bottom perf @ 16676'. 07:30 - 10:00 2.50 OTHCMP Monitor well, stable. Change to 21/16" handling tools, rig up power tongs, make up 2 1/16" XO to safety valve. POH laying down work string to 1400'. 10:00 - 13:30 OTHCMP Monitor well, stable. PJSM with drill crew & Schlumberger perf crew. UD last 6 joints of 21/16" work string. POH UD perf guns. All shots fired. 13:30 - 15:00 OTHCMP Monitor well, stable. Rig down perf crew. Clear & clean rig floor. Change bails & elevators. 15:00 - 15:30 OTHCMP Pull wear bushing. Make dummy run with tubing hanger, OK. 15:30 - 00:00 RUNCMP PJSM. RIU and run 4.5", L-80, IBT-M tubing completion string. 3/15/2005 00:00 - 06:00 RUNCMP RIH with 4.5", L-80, IBT-M Tbg. t/11,268'. Dope each connection w/ BOL 2000 & Torque to mark, 4,000 ftllbs 06:00 - 13:00 7.00 RUNCMP P/U & M/U Well Star TRSV, R/U Contol Line Spooler and Test Line to 5,000 psi. Continue to RIH Banding Control Line to Each Jt.wl SS Bands t/13,378' 13:00 - 15:00 RUNCMP P/U & M/U 2.84' Space Out Pup, Jt. # 309 & Tbg. Hgr. Thread Contol Line Through Tbg. Hgr. & Retest Line t/ 5,000 psi. M/U Ldg. Jt. and Land Tbg. RILDS, Torque t/ 450 ftllbs. Up Wt. 172K, On Wt. 121K 15:00 - 19:30 RUNCMP PJSM-Reverse Circulate 205 bbls. Clean 9.3 ppg NaCIIKCL. Followed by 400 bbl. Corrosion Inhibited 9.3 Brine (25 gals. CI per 100 bbls. Brine). Chase w/162 bbl. Clean Brine. Pump Rate 3 bpm @ 200 psi. 19:30 - 22:00 RUNCMP R/D Circulating Line & Head Pin. Drop 1.875 Ball & Rod. RIU Head Pin & Circulating Line. Pressure Up Tbg. t/ 3,700 psi to Set Pkr. Hold f/30 min Tbg. Test. Bleed Pressure Dn t/2,200 psi. Pressure Up Annulus t/4,000 psi. Hold f/30 min. Pkr. Test. Bleed Annulus t/ 0 psi. Bleed Tbg. t/ 0 psi. Pressure Up Annulus t/2,600 psi and Shear OCR Valve, Circulate @ 3 bpm to Confirm OCR Valve Sheared Fully. Dry Rod TWC & Test from below t/1 ,000 psi. 22:00 - 00:00 2.00 BOPSU P RUNCMP PJSM-N/D BOPE's 3/16/2005 00:00 - 03:00 3.00 BOPSU P RUNCMP N/D BOPE's 03:00 - 06:00 3.00 WHSUR P RUNCMP N/U Adaptor Flange, N/U Tree 06:00 - 06:30 0.50 WHSUR P RUNCMP Install TWC and test tree to 5000 psi 06:30 - 07:00 0.50 WHSUR P RUNCMP RU DSM and pull TWC through lubricator 07:00 - 09:00 2.00 WHSUR P RUNCMP PJSM, RU Little Red and reverse circulate 145 bbls of diesel to freeze protect to 2100', ICP = 150 psi, FCP = 550 psi 09:00 - 14:00 5.00 WHSUR P RUNCMP Allow diesel to U-tube, final tbg press = 0 psi, final annulus press = 0 psi 14:00 - 15:00 1.00 WHSUR P RUNCMP Install BPV and test to 1000 psi from below. RU DSM and install VR plugs in tbg spool outlets. 15:00 - 18:00 3.00 RIGD P POST Secure well, prep for rig move. RIG RELEASED @ 18:00 HRS Printed: 3/22/2005 11: 12:01 AM . . NK-38A MDT Data FORMATION DEPTH DEPTH RESERVOIR RESERVOIR MOB COMMENT MD TVDss All data Good data Sag River 13553 9564 4434 4434 119 GOOD TEST Sag River 13566 9573 4435 4435 31 GOOD TEST Sag River 13600 9597 4439 4439 19 GOOD TEST Sag River 13610 9604 4441 4441 15 GOOD TEST Sag River 13622 9613 4441 4 GOOD TEST Ivishak 13756 9707 4447 4447 560 GOOD TEST Ivishak 13765 9713 4447 2 GOOD TEST Ivishak 13768 9715 4448 4448 840 GOOD TEST Ivishak 13773 9718 4447 2 GOOD TEST l\Ashak 13781 9724 4450 4450 295 GOOD TEST Ivishak 13787 9728 4450 4450 18 GOOD TEST Ivishak 13793 9732 4451 4451 149 GOOD TEST Ivishak 13797 9735 4451 4451 69 GOOD TEST Ivishak 13803 9739 4452 4452 65 GOOD TEST Ivishak 13809 9743 4452 4452 768 GOOD TEST Ivishak 13821 9752 5335 LOST SEAL Ivishak 13822 9753 4452 2 GOOD TEST Ivishak 13826 9755 4486 5 SUPERCHARGED Ivishak 13832 9759 4454 4454 76 GOOD TEST Ivishak 13834 9761 4455 4455 95 GOOD TEST Ivishak 13840 9765 4456 4456 162 GOOD TEST Ivishak 13849 9771 4457 4457 89 GOOD TEST Ivishak 13856 9776 4457 4457 36 GOOD TEST Ivishak 13862 9780 4457 4457 48 GOOD TEST Ivishak 13888 9798 4459 4459 588 GOOD TEST Ivishak 13892 9801 4459 4459 24 GOOD TEST Ivishak 13899 9806 4460 4460 960 GOOD TEST Ivishak 13918 9819 4461 4461 20 GOOD TEST Ivishak 13927 9825 4462 4462 157 GOOD TEST Ivishak 13938 9832 4463 4463 20 GOOD TEST Ivishak 13948 9839 4463 4463 44 GOOD TEST Ivishak 13952 9842 4464 4464 204 GOOD TEST Ivishak 13957 9845 4464 4464 90 GOOD rEST Ivishak 13961 9848 4464 2 GOOD TEST Ivishak 13984 9864 4469 4469 134 Ivishak 13992 9869 4471 4471 218 Ivishak 13998 9873 4472 76 Ivishak 14002 9876 4473 194 . Ivishak 14008 9 4474 50 Ivishak 14012 9 4475 405 Ivishak 14055 9912 4461 93 GOOD TEST Ivishak 14078 9928 4467 14 GOOD TEST Ivishak 14098 9942 4474 98 GOOD TEST Ivishak 14114 9953 4477 5 GOOD TEST Ivishak 14133 9966 4484 19 GOOD TEST NK-38APB1 Survey Report Schlumberuer Report Date: 26-Feb-05 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 46.560' Field: Niakuk Vertical Section Origin: N 0.00011, E 0.000 11 Structure / Slot: Main Pad / NK·38 TVD Reference Datum: Rotary Table Well: NK-38 TVD Reference Elevation: 48.40 11 relative to Mean Sea Level Borehole: NK-38APB1 Sea Bed / Ground Level Elevation: 19.9011 relative to Mean Sea Level UWVAPI#: 500292254070 Magnetic Declination: 25.138' Survey Name / Date: NK-38APB1/ February 26,2005 Total Field Strength: 57657.704 n T Tort / AHD / DDI/ ERD ratio: 242.183' /8616.3511/6.469/0.857 Magnetic Dip: 80.939' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 23, 2005 Location LatILong: N 702050.972, W 148120.133 Magnetic Declination Model: BGGM 2004 . Location Grid NIE Y!X: N 5979949.870 I1US, E 721706.470 I1US North Reference: True North Grid Convergence Angle: +1.69517766' Total Corr Mag North .> True North: +25.138' Grid Scale Factor: 0.99995584 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Closure NS EW DLS Northing Easting Latitude Longitude Depth It RTE 0.00 N 70 20 50.968 W148120.114 First GYD-GC-MS 103.40 N 70 20 50.964 W 148120.094 203.40 N 70 20 50.955 W 148120.057 303.40 N 70 20 50.944 W 148120.018 403.40 N 70 20 50.936 W 148 11 59.988 503.40 0.38 102.50 454.95 503.35 1.37 6.21 7.00 -4.04 5.72 0.24 5979946.00 721712.30 N 7020 50.933 W 148 11 59.966 603.40 0.41 91.57 554.95 603.35 1.81 6.90 7.61 -4.12 6.40 0.08 5979945.94 721712.99 N 7020 50.932 W 148 11 59.946 703.40 0.49 83.25 654.95 703.35 2.41 7.68 8.26 -4.08 7.18 0.10 5979946.00 721713.77 N 70 20 50.932 W 148 11 59.924 803.40 0.38 52.47 754.94 803.34 3.08 8.42 8.75 -3.83 7.87 0.25 5979946.28 721714.45 N 70 20 50.935 W 148 11 59.904 903.40 0.30 45.22 854.94 903.34 3.67 9.02 9.00 -3.44 8.32 0.09 5979946.68 721714.88 N 70 20 50.939 W 148 11 59.890 1003.40 0.31 44.52 954.94 1003.34 4.20 9.55 9.22 ·3.07 8.69 0.01 5979947.06 721715.25 N 70 20 50.942 W 1481.r 1103.40 0.31 25.21 1054.94 1103.34 4.73 10.09 9.37 -2.63 9.00 0.10 5979947.51 721715.54 N 70 20 50.947 W 148 1 1 1203.40 0.35 29.39 1154.94 1203.34 5.27 10.66 9.50 -2.12 9.26 0.05 5979948.03 721715.79 N 70 20 50.952 W 148 11 .863 1303.40 0.44 22.47 1254.94 1303.34 5.91 11.35 9.67 -1.50 9.56 0.10 5979948.66 721716.07 N 70 20 50.958 W 14811 59.854 1403.40 0.45 12.95 1354.93 1403.33 6.59 12.12 9.82 -0.76 9.79 0.07 5979949.40 721716.28 N 70 20 50.965 W 148 11 59.847 1503.40 0.66 13.16 1454.93 1503.33 7.40 13.09 10.01 0.19 10.01 0.21 5979950.35 721716.47 N 70 20 50.974 W 14811 59.841 1603.40 0.92 20.42 1554.92 1603.32 8.60 14.47 10.53 1.50 10.42 0.28 5979951.68 721716.84 N 70 20 50.987 W 148 11 59.829 1703.40 1.17 28.40 1654.90 1703.30 10.29 16.29 11.62 3.15 11.19 0.29 5979953.35 721717.56 N 70 20 51.003 W 148 11 59.806 1803.40 1.83 34.53 1754.87 1803.27 12.82 18.91 13.68 5.36 12.58 0.68 5979955.60 721718.89 N 70 20 51.025 W 148 11 59.766 1903.40 2.81 32.20 1854.78 1903.18 16.76 22.95 17.19 8.75 14.79 0.98 5979959.06 721721.00 N702051.058 W1481159.701 2003.40 4.65 32.19 1954.57 2002.97 23.06 29.46 23.16 14.26 18.26 1.84 5979964.66 721724.30 N702051.113 W1481159.600 2103.40 6.51 33.40 2054.09 2102.49 32.51 39.18 32.51 22.42 23.54 1.86 5979972.98 721729.33 N 70 20 51.193 W 148 11 59.446 2203.40 7.97 42.78 2153.29 2201.69 44.95 51.76 44.98 32.24 31.37 1.87 5979983.03 721736.87 N 70 20 51.289 W 148 11 59.217 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) N K-38\NK-38\NK-38APB 1 \NK-38APBl Generated 4/6/200512:12 PM Page 1 of 5 Comments latitude longitude N 70 20 51.394 W 148 11 58.903 N 702051.516 W 148 11 58.529 2503.40 13.33 39.48 2448.25 2496.65 99.01 105.92 99.10 71.13 69.00 2.39 5980023.01 721773.33 N 702051.672 W 14811 58.117 2603.40 16.24 37.44 2544.93 2593.33 124.26 131.43 124.51 91.14 84.83 2.96 5980043.47 721788.57 N 70 20 51.869 W 148 11 57.655 2703.40 18.43 36.15 2640.39 2688.79 153.62 161.23 154.16 115.01 102.66 2.22 5980067.86 721805.68 N 702052.103 W 14811 57.134 2803.40 19.38 35.44 2734.99 2783.39 185.45 193.62 186.42 141.29 121.61 0.98 5980094.69 721823.84 N 70 20 52.362 W 148 11 56.580 2903.40 19.96 34.94 2829.15 2877.55 218.45 227.28 219.94 168.80 141.00 0.60 5980122.76 721842.41 N 702052.633 W 14811 56.013 3003.40 21.68 33.53 2922.62 2971.02 253.16 262.83 255.33 198.19 160.98 1.79 5980152.73 721861.51 N 702052.922 W 148 11 55.429 3103.40 24.79 30.81 3014.50 3062.90 291 .35 302.26 294.51 231.60 181.93 3.29 5980186.74 721881.46 N 70 20 53.250 W 148 11 54.817 3203.40 27.35 31.19 3104.32 3152.72 333.68 346.21 338.16 269.27 204.57 2.57 5980225.06 721902.97 N 702053.621 W 1481154.156 3303.40 29.62 29.75 3192.21 3240.61 379.49 393.90 385.56 310.38 228.73 2.37 5980266.87 721925.91 N702054.025 W14811.0 3403.40 31.98 33.67 3278.11 3326.51 428.98 445.08 436.59 353.88 255.68 3.10 5980311.15 721951.56 N702054.453 W14811 2 3503.40 35.36 37.82 3361.33 3409.73 483.41 500.50 491.99 398.80 288.12 4.09 5980357.00 721982.65 N 70 20 54.894 W 148 11 51.714 3603.40 38.40 40.01 3441.32 3489.72 542.88 560.50 551.91 445.46 325.84 3.31 5980404.75 722018.97 N 70 20 55.353 W 148 11 50.612 3703.40 40.89 35.75 3518.33 3566.73 605.91 624.28 615.65 495.83 364.94 3.69 5980456.25 722056.57 N 70 20 55.849 W 14811 49.469 3803.40 41.24 37.52 3593.72 3642.12 670.61 689.97 681.34 548.53 404.14 1.21 5980510.09 722094.19 N 702056.367 W 148 11 48.323 3903.40 40.07 34.31 3669.60 3718.00 734.63 755.11 746.47 601.27 442.36 2.40 5980563.93 722130.83 N 70 20 56.886 W 148 11 47.206 4003.40 39.99 32.68 3746.17 3794.57 797.28 819.42 810.71 654.90 477.86 1.05 5980618.59 722164.72 N 70 20 57.413 W 1481146.169 4103.40 39.76 35.02 3822.92 3871.32 859.81 883.53 874.76 708.14 513.56 1.52 5980672.86 722198.83 N 702057.937 W 14811 45.125 4203.40 39.56 32.88 3899.91 3948.31 922.08 947.35 938.54 761.08 549.20 1.38 5980726.82 722232.89 N 70 20 58.457 W 148 11 44.084 4303.40 39.86 30.63 3976.84 4025.24 983.84 1011.23 1002.27 815.40 582.82 1.47 5980782.11 722264.89 N 70 20 58.991 W 1481143.101 4403.40 39.63 31.80 4053.73 4102.13 1045.50 1075.17 1066.03 870.08 615.95 0.78 5980837.75 722296.39 N 702059.529 W 14811 42.133 4503.40 39.82 34.33 4130.65 4179.05 1107.63 1139.07 1129.89 923.63 650.82 1.63 5980892.30 722329.65 N 70210.056 W 1481141.114 4603.40 39.94 34.42 4207.39 4255.79 1170.31 1203.19 1194.00 976.55 687.02 0.13 5980946.27 722364.27 N 70 21 0.576 W 148 11 40.056 4703.40 39.75 32.35 4284.17 4332.57 1232.69 1267.26 1258.03 1030.04 722.27 1.34 5981000.77 722397.92 N 70 211.102 W 1481139.025 4803.40 39.11 35.59 4361.42 4409.82 1294.65 1330.76 1321.52 1082.70 757.74 2.15 5981054.46 722431.82 N 70211.620 W 1481137.989 4903.40 40.21 34.61 4438.40 4486.80 1357.20 1394.58 1385.34 1134.92 794.43 1.27 5981107.74 722466.94 N 70 212.134 W 1481136.916 5003.40 42.38 33.09 4513.53 4561.93 1421.56 1460.57 1451.31 1189.73 831.17 2.39 5981163.61 722502.05 N 70 21 2.673 W 148 1.r 5103.40 44.79 33.49 4585.96 4634.36 1488.66 1529.51 1520.22 1247.35 869.01 2.43 5981222.33 722538.17 N 70 21 3.239 W 148 1 6 5203.40 47.08 32.35 4655.50 4703.90 1558.48 1601.36 1592.03 1307.67 908.05 2.43 5981283.77 722575.40 N 7021 3.833 W 148 1 95 5303.40 49.69 32.09 4721.91 4770.31 1630.90 1676.11 1666.71 1370.92 947.90 2.62 5981348.16 722613.36 N 70 21 4.455 W 148 11 32.430 5403.40 51.82 32.72 4785.17 4833.57 1705.99 1753.55 1744.10 1436.30 989.41 2.19 5981414.74 722652.91 N 70 21 5.098 W 14811 31.217 5503.40 53.24 32.14 4846.00 4894.40 1782.96 1832.92 1823.41 1503.29 1031.97 1.49 5981482.95 722693.47 N 70 21 5.756 W 148 11 29.973 5603.40 55.63 31.53 4904.16 4952.56 1861.62 1914.26 1904.67 1572.39 1074.87 2.44 5981553.30 722734.30 N 70 21 6.436 W 148 11 28.719 5703.40 56.71 30.71 4959.83 5008.23 1941.69 1997.33 1987.61 1643.51 1117.79 1.28 5981625.65 722775.11 N 70217.135 W 1481127.464 5803.40 59.43 29.73 5012.72 5061.12 2023.12 2082.19 2072.27 1716.84 1160.50 2.84 5981700.21 722815.62 N 70 21 7.856 W 14811 26.215 5903.40 61.24 29.09 5062.21 5110.61 2106.14 2169.08 2158.88 1792.53 1203.16 1.89 5981777.13 722856.02 N 70 21 8.601 W 148 11 24.968 6003.40 60.67 29.29 5110.76 5159.16 2189.58 2256.50 2246.02 1868.85 1245.80 0.60 5981854.67 722896.38 N 70 21 9.351 W 148 11 23.721 6033.40 60.74 29.52 5125.44 5173.84 2214.58 2282.66 2272.12 1891.65 1258.64 0.71 5981877.83 722908.55 N 7021 9.575 W 148 11 23.346 6063.40 60.77 29.19 5140.10 5188.50 2239.58 2308.84 2298.22 1914.46 1271.47 0.96 5981901.02 722920.70 N 70 21 9.800 W 148 11 22.971 6093.40 61.01 29.49 5154.69 5203.09 2264.62 2335.05 2324.36 1937.31 1284.32 1.18 5981924.23 722932.86 N 7021 10.024 W 148 11 22.595 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38APB 1 \NK-38APB1 Generated 4/6/200512:12 PM Page 2 of 5 Comments Latitude Longitude N 70 21 10.250 W 14811 22.217 6153.40 63.21 30.01 5182.89 5231.29 2315.27 2388.01 2377.19 1983.36 1310.46 4.95 5981971.04 722957.63 N 70 21 10.477 W 14811 21.831 6183.40 63.49 30.64 5196.35 5244.75 2341.01 2414.82 2403.96 2006.51 1324.00 2.10 5981994.57 722970.48 N 70 21 10.705 W 148 11 21.435 6213.40 64.12 30.89 5209.59 5257.99 2366.92 2441.74 2430.85 2029.64 1337.77 2.23 5982018.10 722983.56 N 70 21 10.932 W 148 11 21.032 6243.40 64.93 30.99 5222.49 5270.89 2393.00 2468.82 2457.91 2052.87 1351.70 2.72 5982041.73 722996.79 N 70 2111.161 W 14811 20.625 6273.40 65.19 31.34 5235.14 5283.54 2419.22 2496.02 2485.10 2076.14 1365.77 1.37 5982065.41 723010.17 N 70 2111.390 W 148 11 20.214 6303.40 64.96 31.15 5247.78 5296.18 2445.46 2523.23 2512.28 2099.40 1379.88 0.96 5982089.07 723023.59 N 7021 11.618 W 14811 19.801 6333.40 64.71 31.00 5260.54 5308.94 2471.63 2550.38 2539.42 2122.66 1393.90 0.95 5982112.73 723036.91 N 7021 11.847 W 14811 19.391 6363.40 64.76 30.96 5273.35 5321.75 2497.76 2577.51 2566.52 2145.92 1407.87 0.21 5982136.40 723050.18 N 7021 12.076 W 148 11 18.983 6393.40 64.58 30.82 5286.18 5334.58 2523.87 2604.63 2593.62 2169.19 1421.79 0.73 5982160.07 723063.40 N 7021 12.305 W 14811 18.576 6423.40 64.58 30.65 5299.06 5347.46 2549.94 2631.72 2620.69 2192.48 1435.63 0.51 5982183.75 723076.55 N 70 21 12.534 W 148 11.1 6453.40 64.72 30.84 5311.90 5360.30 2576.03 2658.83 2647.77 2215.78 1449.49 0.74 5982207.45 723089.72 N 702112.763 W 148111 . 66 6483.40 64.51 30.83 5324.76 5373.16 2602.12 2685.94 2674.85 2239.05 1463.39 0.70 5982231.12 723102.92 N 7021 12.992 W 14811 17.360 6513.40 65.09 30.85 5337.54 5385.94 2628.24 2713.08 2701.98 2262.36 1477.30 1.93 5982254.83 723116.13 N 7021 13.221 W 148 11 16.953 6543.40 64.65 31.05 5350.28 5398.68 2654.40 2740.24 2729.12 2285.65 1491.27 1.59 5982278.53 723129.41 N 702113.450 W 1481116.544 6573.40 64.92 31.02 5363.06 5411.46 2680.55 2767.38 2756.24 2308.91 1505.26 0.90 5982302.19 723142.71 N 70 2113.679 W 14811 16.135 6603.40 65.01 31.12 5375.75 5424.15 2706.75 2794.57 2783.41 2332.19 1519.29 0.43 5982325.87 723156.04 N 702113.908 W 1481115.725 6633.40 64.83 31.26 5388.47 5436.87 2732.95 2821.74 2810.56 2355.43 1533.36 0.73 5982349.52 723169.41 N702114.136 W1481115.314 6663.40 65.13 31.29 5401.16 5449.56 2759.17 2848.92 2837.73 2378.67 1547.47 1.00 5982373.16 723182.83 N702114.365 W1481114.901 6693.40 64.96 31.34 5413.81 5462.21 2785.41 2876.12 2864.92 2401.90 1561.61 0.59 5982396.80 723196.28 N 70 21 14.593 W 14811 14.488 6723.40 65.27 31.64 5426.44 5474.84 2811.69 2903.34 2892.13 2425.11 1575.83 1.38 5982420.42 723209.80 N 70 21 14.821 W 148 11 14.072 6753.40 64.94 31.72 5439.07 5487.47 2837.99 2930.55 2919.33 2448.27 1590.12 1.13 5982443.99 723223.40 N702115.049 W 1481113.654 6783.40 65.00 31.83 5451.76 5500.16 2864.27 2957.73 2946.51 2471.38 1604.43 0.39 5982467.51 723237.02 N702115.276 W 1481113.236 6813.40 65.17 31.93 5464.40 5512.80 2890.59 2984.94 2973.71 2494.48 1618.80 0.64 5982491.03 723250.70 N702115.504 W 1481112.815 6843.40 64.95 31.95 5477.05 5525.45 2916.92 3012.14 3000.91 2517.56 1633.19 0.74 5982514.53 723264.40 N702115.731 W1481112.395 6873.40 65.03 31.96 5489.73 5538.13 2943.22 3039.33 3028.09 2540.63 1647.58 0.27 5982538.01 723278.10 N702115.957 W1481111.974 6903.40 64.97 31.73 5502.41 5550.81 2969.52 3066.52 3055.27 2563.73 1661.93 0.72 5982561.52 723291.76 N702116.184 W1481111.554 6933.40 64.76 31.72 5515.15 5563.55 2995.78 3093.68 3082.43 2586.83 1676.21 0.70 5982585.03 723305.35 N 70 2116.412 W 1481.7 6963.40 65.08 31.60 5527.87 5576.27 3022.03 3120.85 3109.59 2609.96 1690.47 1.13 5982608.57 723318.92 N 70 2116.639 W 1481 0 7003.40 65.11 31.79 5544.71 5593.11 3057.10 3157.13 3145.86 2640.83 1709.53 0.44 5982639.99 723337.06 N702116.943 W14811 .62 7103.40 65.62 31.02 5586.40 5634.80 3144.84 3248.03 3236.73 2718.41 1756.90 0.87 5982718.93 723382.10 N 70 21 17.706 W 148118.777 7203.40 65.23 32.52 5627.99 5676.39 3232.76 3338.97 3327.65 2795.72 1804.77 1.42 5982797.63 723427.67 N 70 21 18.466 W 148117.377 7303.40 65.32 33.76 5669.82 5718.22 3321.11 3429.80 3418.48 2871.78 1854.43 1.13 5982875.11 723475.05 N 70 21 19.214 W 148 11 5.925 7403.40 65.94 33.18 5711.08 5759.48 3409.83 3520.89 3509.56 2947.76 1904.66 0.81 5982952.55 723523.02 N 70 21 19.961 W 148 11 4.456 7497.40 66.60 34.86 5748.91 5797.31 3493.83 3606.94 3595.60 3019.08 1952.81 1.78 5983025.25 723569.03 N 70 21 20.662 W 14811 3.048 7603.40 66.47 33.45 5791.12 5839.52 3588.79 3704.17 3692.80 3099.54 2007.40 1.23 5983107.29 723621.21 N 70 21 21.453 W 148111.452 7703.40 66.79 35.03 5830.79 5879.19 3678.47 3795.97 3784.57 3175.42 2059.05 1.49 5983184.66 723670.59 N 70 2122.199 W 148 1059.941 7803.40 65.98 33.43 5870.85 5919.25 3767.98 3887.59 3876.17 3251.17 2110.59 1.67 5983261.90 723719.87 N 7021 22.944 W 1481058.434 7903.40 65.73 33.59 5911.75 5960.15 3856.87 3978.84 3967.42 3327.26 2160.97 0.29 5983339.44 723767.97 N 702123.692 W 148 1056.961 Last GYD-GC-MS 8003.40 65.00 34.47 5953.44 6001.84 3945.60 4069.74 4058.30 3402.59 2211.83 1.08 5983416.24 723816.58 N 7021 24.433 W 148 1055.473 First MWD 8065.16 64.82 36.47 5979.63 6028.03 4000.49 4125.67 4114.18 3448.14 2244.29 2.95 5983462.73 723847.67 N 70 2124.881 W 1481054.524 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 ßld( d031 rt-546 ) NK-38\NK-38\NK-38APß1 \NK-38APß1 Generated 4/6/200512:12 PM Page 3 of 5 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure It It It 8158.68 64.33 36.59 6019.78 6068.18 4083.66 4210.13 4198.49 3516.01 2294.56 0.54 5983532.05 723895.92 N 7021 25.548 W 148 1053.054 8256.32 64.41 35.22 6062.01 6110.41 4170.17 4298.17 4286.42 3587.31 2346.19 1.27 5983604.85 723945.41 N 7021 26.249 W 148 1051.544 8349.68 64.53 35.22 6102.25 6150.65 4252.77 4382.41 4370.61 3656.13 2394.77 0.13 5983675.07 723991.93 N 702126.926 W 1481050.123 8447.27 64.29 35.73 6144.40 6192.80 4339.14 4470.43 4458.56 3727.81 2445.85 0.53 5983748.23 724040.87 N 70 21 27.631 W 1481048.629 8533.94 64.05 36.78 6182.17 6230.57 4415.89 4548.44 4536.47 3790.72 2491.99 1.13 5983812.47 724085.12 N 70 2128.249 W 1481047.279 8628.58 63.41 36.30 6224.05 6272.45 4499.46 4633.30 4621.20 3858.90 2542.51 0.81 5983882.11 724133.60 N 70 21 28.920 W 148 1045.802 8723.60 63.56 34.89 6266.48 6314.88 4582.93 4718.33 4706.16 3928.04 2592.00 1.34 5983952.68 724181.02 N 70 21 29.600 W 148 1044.354 8818.96 62.64 35.62 6309.62 6358.02 4666.32 4803.37 4791.16 3997.48 2641.08 1.18 5984023.54 724228.03 N 70 21 30.282 W 148 1042.918 8916.49 62.92 36.16 6354.23 6402.63 4751.55 4890.10 4877.81 4067.74 2691.93 0.57 5984095.27 724276.77 N 70 21 30.973 W 148 1041.431 9008.46 64.18 38.08 6395.20 6443.60 4832.78 4972.44 4959.98 4133.39 2741.62 2.32 5984162.36 724324.50 N 70 21 31.619 W 148 1039.977 Tie-In Survey (MWD) 9102.73 64.61 38.24 6435.94 6484.34 4916.88 5057.45 5044.72 4200.24 2794.15 0.00 5984230.73 724375.02 N 70 21 32.276 W 148 1.1 Top Window (Blind) 9163.00 64.33 38.11 6461.91 6510.31 4970.68 5111.83 5098.94 4242.99 2827.76 0.50 5984274.45 724407.35 N 7021 32.696 W 148 10 . 58 Base Window (Blind) 9179.00 64.51 35.99 6468.82 6517.22 4984.91 5126.27 5113.35 4254.51 2836.46 12.00 5984286.22 724415.70 N 7021 32.810 W 1481037.203 Blind (lAB Inc Only) 9213.58 65.08 33.00 6483.55 6531.95 5015.50 5157.55 5144.63 4280.29 2854.17 7.99 5984312.52 724432.65 N 7021 33.063 W 1481036.685 First MWD+IFR+MS 9307.56 61.61 25.05 6525.76 6574.16 5095.52 5241.50 5228.24 4353.60 2894.95 8.41 5984386.99 724471.24 N 7021 33.784 W 1481035.492 9401.58 60.68 19.18 6571.16 6619.56 5170.44 5323.83 5308.91 4429.83 2925.95 5.56 5984464.11 724499.96 N 7021 34.533 W 1481034.585 9495.74 60.99 20.95 6617.05 6665.45 5244.02 5406.05 5388.93 4507.05 2954.16 1.67 5984542.13 724525.88 N 70 21 35.293 W 1481033.759 9589.00 60.70 20.24 6662.49 6710.89 5317.25 5487.50 5468.43 4583.29 2982.81 0.73 5984619.18 724552.26 N 70 2136.043 W 1481032.921 9685.83 58.69 17.94 6711.35 6759.75 5391.42 5571.09 5549.58 4662.28 3010.16 2.92 5984698.93 724577.26 N702136.819 W1481032.120 9779.64 56.31 14.92 6761.76 6810.16 5459.84 5650.20 5625.51 4738.14 3032.56 3.72 5984775.42 724597.40 N 70 21 37.565 W 1481031.464 9875.18 54.40 13.10 6816.07 6864.47 5526.10 5728.79 5700.05 4814.39 3051.60 2.54 5984852.20 724614.18 N 70 21 38.315 W 148 1030.907 9969.83 52.66 10.83 6872.34 6920.74 5588.75 5804.90 5771.44 4888.83 3067.39 2.66 5984927.07 724627.76 N 70 21 39.047 W 148 1030.444 10065.18 51.55 8.16 6930.91 6979.31 5648.79 5880.14 5840.97 4963.03 3079.82 2.50 5985001.60 724637.98 N 70 2139.777 W 1481030.080 10158.53 47.18 2.54 6991.71 7040.11 5702.11 5950.94 5904.46 5033.48 3086.53 6.54 5985072.22 724642.61 N 70 21 40.470 W 148 1029.883 10252.69 45.96 357.54 7056.47 7104.87 5749.15 6019.30 5962.86 5101.82 3086.60 4.07 5985140.53 724640.67 N 70 21 41.142 W 148 1029.880 10346.30 44.70 352.43 7122.30 7170.70 5790.52 6085.84 6016.70 5168.10 3080.82 4.11 5985206.60 724632.92 N702141.794 W1481030.048 10439.53 40.95 346.55 7190.69 7239.09 5825.03 6149.18 6064.47 5230.36 3069.39 5.88 5985268.49 724619.65 N 70 2142.406 W 1481030.382 10534.32 40.69 339.10 7262.47 7310.87 5852.42 6211.09 6106.38 5289.47 3051.13 5.14 5985327.04 724599.65 N 70 2142.987 W 1481.5 10629.62 42.94 333.71 7333.51 7381.91 5873.91 6274.60 6144.24 5347.62 3025.66 4.45 5985384.41 724572.48 N 70 21 43.559 W 1481 9 10722.73 42.61 330.03 7401.87 7450.27 5890.61 6337.82 6178.32 5403.37 2995.86 2.71 5985439.25 724541.04 N 7021 44.108 W 1481032.529 10817.35 42.77 328.15 7471.42 7519.82 5904.52 6401.97 6210.72 5458.41 2962.91 1.36 5985493.28 724506.48 N 70 21 44.649 W 1481033.492 10911.09 42.67 325.10 7540.30 7588.70 5915.64 6465.56 6240.95 5511.50 2927.93 2.21 5985545.32 724469.95 N 70 2145.172 W 1481034.515 11005.69 42.05 323.35 7610.20 7658.60 5924.14 6529.30 6269.40 5563.22 2890.68 1.41 5985595.90 724431.18 N 70 21 45.680 W 1481035.603 11099.36 41.86 323.74 7679.86 7728.26 5931.76 6591.92 6297.19 5613.59 2853.47 0.34 5985645.15 724392.50 N 702146.176 W 1481036.691 11194.19 41.53 323.58 7750.67 7799.07 5939.55 6655.00 6325.80 5664.40 2816.09 0.37 5985694.83 724353.64 N 70 21 46.676 W 148 1037.783 11289.24 41.20 322.57 7822.01 7870.41 5946.68 6717.81 6354.21 5714.61 2778.35 0.78 5985743.90 724314.44 N 70 2147.170 W 1481038.886 11381.27 41.89 323.40 7890.89 7939.29 5953.52 6778.84 6382.21 5763.35 2741.61 0.96 5985791.53 724276.27 N 70 21 47.649 W 148 1039.960 11472.55 41.82 325.16 7958.88 8007.28 5961.70 6839.75 6411.81 5812.79 2706.06 1.29 5985839.89 724239.27 N 70 2148.135 W 1481040.999 11567.19 41.78 325.83 8029.43 8077 .83 5971.49 6902.83 6444.08 5864.77 2670.32 0.47 5985890.80 724202.02 N 702148.647 W 1481042.044 11660.77 41.08 325.39 8099.59 8147.99 5981.23 6964.75 6476.31 5915.87 2635.35 0.81 5985940.83 724165.55 N 70 2149.150 W 1481043.066 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38APB1 \NK-38APB 1 Generated 4/6/200512:12 PM Page 4 of 5 Comments Latitude Longitude N 70 2149.652 W 1481044.093 N 70 21 50.142 W 1481045.082 N702150.635 W1481046.116 N 702151.085 W 1481047.197 12129.68 36.66 313.40 8461.30 8509.70 6013.46 7262.93 6624.64 6152.80 2455.37 3.77 5986172.33 723978.64 N 70 21 51.480 W 148 1048.327 12223.70 34.39 308.14 8537.83 8586.23 6008.03 7317.53 6642.69 6188.50 2414.07 4.05 5986206.79 723936.31 N 70 21 51.832 W 148 1049.534 12316.52 34.23 303.74 8614.51 8662.91 5998.39 7369.83 6656.09 6219.19 2371.74 2.68 5986236.21 723893.09 N 70 2152.134 W 1481050.772 12408.73 34.61 301.90 8690.58 8738.98 5986.01 7421.95 6667.07 6247.44 2327.94 1.20 5986263.15 723848.48 N 70 2152.411 W 1481052.053 12502.71 35.50 301.75 8767.51 8815.91 5972.28 7475.93 6677.94 6275.90 2282.08 0.95 5986290.24 723801.80 N 70 2152.692 W 1481053.394 12565.14 35.24 301.52 8818.42 8866.82 5962.97 7512.07 6685.33 6294.86 2251.31 0.47 5986308.28 723770.48 N 70 21 52.878 W 1481054.293 12596.91 35.17 301.90 8844.38 8892.78 5958.28 7530.38 6689.17 6304.48 2235.73 0.72 5986317.44 723754.62 N 70 2152.973 W 1481.9 12689.72 35.09 299.00 8920.29 8968.69 5943.46 7583.78 6699.49 6331.54 2189.70 1.80 5986343.12 723707.82 N 70 21 53.239 W 1481 5 12783.83 36.46 293.65 8996.66 9045.06 5924.41 7638.77 6706.61 6355.88 2140.41 3.63 5986365.99 723657.83 N 70 21 53.479 W 148105 .536 12878.29 38.49 288.35 9071.64 9120.04 5899.58 7696.21 6709.19 6376.40 2086.78 4.03 5986384.92 723603.62 N 70 2153.681 W 1481059.104 12971.38 41.66 282.16 9142.89 9191.29 5868.39 7756.10 6706.35 6392.05 2029.00 5.47 5986398.85 723545.41 N 70 21 53.835 W 14811 0.794 13065.60 43.64 277.49 9212.21 9260.61 5830.19 7819.91 6697.96 6402.89 1966.14 3.96 5986407.82 723482.25 N 70 21 53.941 W 14811 2.632 13159.87 44.92 277.40 9279.70 9328.10 5788.67 7885.73 6687.27 6411.42 1900.88 1.36 5986414.41 723416.77 N 70 21 54.025 W 148 11 4.541 13254.87 43.05 276.71 9348.05 9396.45 5746.71 7951.70 6676.75 6419.52 1835.41 2.03 5986420.58 723351.09 N 70 2154.105 W 148 11 6.456 13350.99 43.39 274.95 9418.10 9466.50 5703.76 8017.52 6665.49 6426.21 1769.93 1.30 5986425.32 723285.45 N 702154.171 W 148 11 8.371 13446.69 43.66 273.50 9487.49 9535.89 5659.38 8083.43 6653.03 6431.06 1704.20 1.08 5986428.23 723219.61 N 7021 54.219 W 148 11 10.293 13476.41 43.84 273.13 9508.96 9557.36 5645.30 8103.98 6648.96 6432.25 1683.69 1.05 5986428.81 723199.07 N 70 21 54.231 W 148 11 10.893 13616.42 45.33 271.98 9608.67 9657.07 5577.01 8202.25 6629.02 6436.62 1585.51 1.21 5986430.27 723100.81 N 7021 54.274 W 148 11 13.764 13711.68 45.44 272.49 9675.58 9723.98 5529.63 8270.06 6615.71 6439.26 1517.75 0.40 5986430.91 723033.01 N 7021 54.300 W 148 1115.746 13806.97 46.13 272.46 9742.03 9790.43 5482.12 8338.36 6603.27 6442.21 1449.52 0.72 5986431.84 722964.72 N 7021 54.329 W 148 11 17.741 13901.31 46.61 272.97 9807.12 9855.52 5434.82 8406.64 6591.80 6445.45 1381.31 0.64 5986433.06 722896.45 N 702154.361 W 1481119.736 13996.58 46.95 274.06 9872.36 9920.76 5387.43 8476.07 6581.80 6449.70 1312.02 0.91 5986435.26 722827.06 N 70 21 54.403 W 148 11 21.762 14092.12 46.69 274.62 9937.74 9986.14 5340.61 8545.74 6573.48 6454.98 1242.55 0.51 5986438.48 722757.47 N 70 21 54.455 W 148 11 23.794 Last MWD+IFR+MS 14140.74 46.82 274.57 9971.05 10019.45 5316.93 8581.15 6569.69 6457.81 1207.25 0.28 5986440.27 722722.10 N 70 21 54.483 W 148 11 24.826 TO ( Projected) 14189.00 46.82 274.57 10004.07 10052.47 5293.39 8616.35 6566.09 6460.62 1172.17 0.00 5986442.03 722686.96 N 70 21 54.511 W 1481.52 Survey Type: Definitive Survey NOTES: GYD GC MS - ( Gyrodata - gyro compassing m/s -- Older Gyrodata gyro multishots-plus all battery/memory tool surveys (RGS-BT). Replaces ex-BP "Gyrodata multishot into open hole" model. ) MWD - Standard -- ( Measurement While Drilling with no (or no known) special corrections. The model allows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal east/west. MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy.) Leqal Description: Northinq ey) rnUSl Eastinq eX) rnUSl Surface: 1410 FSL 854 FEL S36 T12N R15E UM 5979949.87 721706.47 Tie-In: 1409 F8L 853 FEL 836 T12N R15E UM 5979949.44 721707.16 BHL: 2590 FSL 4532 FEL S30 T12N R16E UM 5986442.03 722686.96 SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Bld( d031rt-546) NK-38\NK-38\NK-38APB1 \NK-38APB 1 Generated 4/6/200512:12 PM Page 5 of 5 NK-38A Survey Report Schlumbørgør Report Date: 9-Mar-05 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 46.560' Field: Niakuk Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: Main Pad / NK-38 TVD Reference Datum: Rotary Table Well: NK-38 TVD Reference Elevation: 48.40 It relative to Mean Sea Level Borehole: NK-38A Sea Bed I Ground Level Elevation: 19.90 ft relative to Mean Sea Level UWVAPI#: 500292254001 Magnetic Declination: 25.127' Survey Name I Date: NK-38A / March 9, 2005 Total Field Strength: 57658.553 nT Tort I AHD I DDII ERD ratio: 403.277' /11288.70 ft /6.886/1.137 Magnetic Dip: 80.940' Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 04, 2005 . Location Lat/Long: N 70 20 50.972, W 14812 0.133 Magnetic Declination Model: BGGM 2004 Location Grid NlE Y/X: N 5979949.870 ftUS, E 721706.470 ftUS North Reference: True North Grid Convergence Angle: +1.69517766' Total Corr Mag North -) True North: +25.127' Grid Scale Factor: 0.99995584 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Closure NS Latitude Longitude Depth It RTE 0.00 N 70 20 50.968 W148120.114 First GYD-GC-MS 103.40 N 70 20 50.964 W 148 120.094 203.40 N 70 20 50.955 W 148120.057 303.40 N 70 20 50.944 W 148120.018 403.40 N 70 20 50.936 W 148 11 59.988 503.40 0.38 102.50 454.95 503.35 1.37 6.21 7.00 -4.04 5.72 0.24 5979946.00 721712.30 N 70 20 50.933 W 148 11 59.966 603.40 0.41 91.57 554.95 603.35 1.81 6.90 7.61 -4.12 6.40 0.08 5979945.94 721712.99 N 70 20 50.932 W 148 11 59.946 703.40 0.49 83.25 654.95 703.35 2.41 7.68 8.26 -4.08 7.18 0.10 5979946.00 721713.77 N 70 20 50.932 W 148 11 59.924 803.40 0.38 52.47 754.94 803.34 3.08 8.42 8.75 -3.83 7.87 0.25 5979946.28 721714.45 N 70 20 50.935 W 148 11 59.904 903.40 0.30 45.22 854.94 903.34 3.67 9.02 9.00 -3.44 8.32 0.09 5979946.68 721714.88 N 70 20 50.939 W 1481159.890 1 003.40 0.31 44.52 954.94 1003.34 4.20 9.55 9.22 -3.07 8.69 0.01 5979947.06 721715.25 N 7020 50.942 W 148 1.79 1103.40 0.31 25.21 1054.94 1103.34 4.73 10.09 9.37 -2.63 9.00 0.10 5979947.51 721715.54 N 702050.947 W 1481 71 1203.40 0.35 29.39 1154.94 1203.34 5.27 10.66 9.50 -2.12 9.26 0.05 5979948.03 721715.79 N 70 20 50.952 W 148 11 59.863 1303.40 0.44 22.47 1254.94 1303.34 5.91 11.35 9.67 -1.50 9.56 0.10 5979948.66 721716.07 N 70 20 50.958 W 148 11 59.854 1403.40 0.45 12.95 1354.93 1403.33 6.59 12.12 9.82 -0.76 9.79 0.07 5979949.40 721716.28 N 70 20 50.965 W 148 11 59.847 1503.40 0.66 13.16 1454.93 1503.33 7.40 13.09 10.01 0.19 10.01 0.21 5979950.35 721716.47 N 70 20 50.974 W 148 11 59.841 1603.40 0.92 20.42 1554.92 1603.32 8.60 14.47 10.53 1.50 10.42 0.28 5979951.68 721716.84 N 70 20 50.987 W 148 11 59.829 1703.40 1.17 28.40 1654.90 1703.30 10.29 16.29 11.62 3.15 11.19 0.29 5979953.35 721717.56 N 70 20 51.003 W 14811 59.806 1803.40 1.83 34.53 1754.87 1803.27 12.82 18.91 13.68 5.36 12.58 0.68 5979955.60 721718.89 N702051.025 W1481159.766 1903.40 2.81 32.20 1854.78 1903.18 16.76 22.95 17.19 8.75 14.79 0.98 5979959.06 721721.00 N 70 20 51.058 W 148 11 59.701 2003.40 4.65 32.19 1954.57 2002.97 23.06 29.46 23.16 14.26 18.26 1.84 5979964.66 721724.30 N 70 20 51.113 W 148 11 59.600 2103.40 6.51 33.40 2054.09 2102.49 32.51 39.18 32.51 22.42 23.54 1.86 5979972.98 721729.33 N 70 20 51.193 W 1481159.446 2203.40 7.97 42.78 2153.29 2201.69 44.95 51.76 44.98 32.24 31.37 1.87 5979983.03 721736.87 N 702051.289 W 148 11 59.217 2303.40 9.42 47.64 2252.14 2300.54 60.05 66.87 60.08 42.85 42.12 1.62 5979993.94 721747.31 N 702051.394 W 148 11 58.903 2403.40 11.16 44.21 2350.53 2398.93 77.90 84.72 77.94 55.30 54.92 1.84 5980006.77 721759.73 N 702051.516 W 14811 58.529 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\N K-38\N K-38A \NK-38A Generated 4/6/200512:12 PM Page 1017 Comments Latitude Longitude 2503.40 13.33 39.48 2448.25 2496.65 99.01 105.92 99.10 71.13 69.00 2.39 5980023.01 721773.33 N 70 20 51.672 W 1481158.117 2603.40 16.24 37.44 2544.93 2593.33 124.26 131.43 124.51 91.14 84.83 2.96 5980043.47 721788.57 N 70 20 51.869 W 148 11 57.655 2703.40 18.43 36.15 2640.39 2688.79 153.62 161.23 154.16 115.01 102.66 2.22 5980067.86 721805.68 N 702052.103 W 1481157.134 2803.40 19.38 35.44 2734.99 2783.39 185.45 193.62 186.42 141.29 121.61 0.98 5980094.69 721823.84 N 70 20 52.362 W 148 11 56.580 2903.40 19.96 34.94 2829.15 2877.55 218.45 227.28 219.94 168.80 141.00 0.60 5980122.76 721842.41 N 7020 52.633 W 148 11 56.013 3003.40 21.68 33.53 2922.62 2971.02 253.16 262.83 255.33 198.19 160.98 1.79 5980152.73 721861.51 N 70 20 52.922 W 148 11 55.429 3103.40 24.79 30.81 3014.50 3062.90 291.35 302.26 294.51 231.60 181.93 3.29 5980186.74 721881.46 N 70 20 53.250 W 148 11 54.817 3203.40 27.35 31.19 3104.32 3152.72 333.68 346.21 338.16 269.27 204.57 2.57 5980225.06 721902.97 N 70 20 53.621 W 148 11 54.156 3303.40 29.62 29.75 3192.21 3240.61 379.49 393.90 385.56 310.38 228.73 2.37 5980266.87 721925.91 N 70 20 54.025 W 148 11 53.450 3403.40 31.98 33.67 3278.11 3326.51 428.98 445.08 436.59 353.88 255.68 3.10 5980311.15 721951.56 N 70 20 54.453 W 148 11 52.662 3503.40 35.36 37.82 3361.33 3409.73 483.41 500.50 491.99 398.80 288.12 4.09 5980357.00 721982.65 N 70 20 54.894 W 148 11. 3603.40 38.40 40.01 3441.32 3489.72 542.88 560.50 551.91 445.46 325.84 3.31 5980404.75 722018.97 N 70 20 55.353 W 14811 . 12 3703.40 40.89 35.75 3518.33 3566.73 605.91 624.28 615.65 495.83 364.94 3.69 5980456.25 722056.57 N 70 20 55.849 W 148 11 49.469 3803.40 41.24 37.52 3593.72 3642.12 670.61 689.97 681.34 548.53 404.14 1.21 5980510.09 722094.19 N 70 20 56.367 W 148 11 48.323 3903.40 40.07 34.31 3669.60 3718.00 734.63 755.11 746.47 601.27 442.36 2.40 5980563.93 722130.83 N 70 20 56.886 W 148 11 47.206 4003.40 39.99 32.68 3746.17 3794.57 797.28 819.42 810.71 654.90 477.86 1.05 5980618.59 722164.72 N702057.413 W1481146.169 4103.40 39.76 35.02 3822.92 3871.32 859.81 883.53 874.76 708.14 513.56 1.52 5980672.86 722198.83 N 702057.937 W 148 11 45.125 4203.40 39.56 32.88 3899.91 3948.31 922.08 947.35 938.54 761.08 549.20 1.38 5980726.82 722232.89 N 70 20 58.457 W 148 11 44.084 4303.40 39.86 30.63 3976.84 4025.24 983.84 1011.23 1002.27 815.40 582.82 1.47 5980782.11 722264.89 N 702058.991 W 148 11 43.101 4403.40 39.63 31.80 4053.73 4102.13 1045.50 1075.17 1066.03 870.08 615.95 0.78 5980837.75 722296.39 N 702059.529 W 148 11 42.133 4503.40 39.82 34.33 4130.65 4179.05 1107.63 1139.07 1129.89 923.63 650.82 1.63 5980892.30 722329.65 N 70210.056 W 1481141.114 4603.40 39.94 34.42 4207.39 4255.79 1170.31 1203.19 1194.00 976.55 687.02 0.13 5980946.27 722364.27 N 7021 0.576 W 148 11 40.056 4703.40 39.75 32.35 4284.17 4332.57 1232.69 1267.26 1258.03 1030.04 722.27 1.34 5981000.77 722397.92 N 7021 1.102 W 14811 39.025 4803.40 39.11 35.59 4361.42 4409.82 1294.65 1330.76 1321.52 1082.70 757.74 2.15 5981054.46 722431.82 N 70 21 1.620 W 148 11 37.989 4903.40 40.21 34.61 4438.40 4486.80 1357.20 1394.58 1385.34 1134.92 794.43 1.27 5981107.74 722466.94 N 70212.134 W 1481136.916 5003.40 42.38 33.09 4513.53 4561.93 1421.56 1460.57 1451.31 1189.73 831.17 2.39 5981163.61 722502.05 N 7021 2.673 W 148 11 35.842 5103.40 44.79 33.49 4585.96 4634.36 1488.66 1529.51 1520.22 1247.35 869.01 2.43 5981222.33 722538.17 N 7021 3.239 W 148 11 34.736 5203.40 47.08 32.35 4655.50 4703.90 1558.48 1601.36 1592.03 1307.67 908.05 2.43 5981283.77 722575.40 N 70 21 3.833 W 148 1.5 5303.40 49.69 32.09 4721.91 4770.31 1630.90 1676.11 1666.71 1370.92 947.90 2.62 5981348.16 722613.36 N 70 21 4.455 W 148 1 0 5403.40 51.82 32.72 4785.17 4833.57 1705.99 1753.55 1744.10 1436.30 989.41 2.19 5981414.74 722652.91 N 70 21 5.098 W 1481 17 5503.40 53.24 32.14 4846.00 4894.40 1782.96 1832.92 1823.41 1503.29 1031.97 1.49 5981482.95 722693.47 N 70 21 5.756 W 148 11 29.973 5603.40 55.63 31.53 4904.16 4952.56 1861.62 1914.26 1904.67 1572.39 1074.87 2.44 5981553.30 722734.30 N 70 21 6.436 W 148 11 28.719 5703.40 56.71 30.71 4959.83 5008.23 1941.69 1997.33 1987.61 1643.51 1117.79 1.28 5981625.65 722775.11 N 70 217.135 W 14811 27.464 5803.40 59.43 29.73 5012.72 5061.12 2023.12 2082.19 2072.27 1716.84 1160.50 2.84 5981700.21 722815.62 N 70 217.856 W 14811 26.215 5903.40 61.24 29.09 5062.21 5110.61 2106.14 2169.08 2158.88 1792.53 1203.16 1.89 5981777.13 722856.02 N 70 21 8.601 W 148 11 24.968 6003.40 60.67 29.29 5110.76 5159.16 2189.58 2256.50 2246.02 1868.85 1245.80 0.60 5981854.67 722896.38 N 7021 9.351 W 148 11 23.721 6033.40 60.74 29.52 5125.44 5173.84 2214.58 2282.66 2272.12 1891.65 1258.64 0.71 5981877.83 722908.55 N 70 21 9.575 W 148 11 23.346 6063.40 60.77 29.19 5140.10 5188.50 2239.58 2308.84 2298.22 1914.46 1271.47 0.96 5981901.02 722920.70 N 70 21 9.800 W 148 11 22.971 6093.40 61.01 29.49 5154.69 5203.09 2264.62 2335.05 2324.36 1937.31 1284.32 1.18 5981924.23 722932.86 N 70 21 10.024 W 148 11 22.595 6123.40 61.82 29.42 5169.04 5217.44 2289.80 2361.39 2350.64 1960.25 1297.27 2.71 5981947.54 722945.13 N702110.250 W1481122.217 6153.40 63.21 30.01 5182.89 5231.29 2315.27 2388.01 2377.19 1983.36 1310.46 4.95 5981971.04 722957.63 N 70 21 10.477 W 148 11 21.831 6183.40 63.49 30.64 5196.35 5244.75 2341.01 2414.82 2403.96 2006.51 1324.00 2.10 5981994.57 722970.48 N 70 21 10.705 W 148 11 21.435 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38A \NK-38A Generated 4/6/200512:12 PM Page 2 of 7 · ý Com ments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure (ft) (deQ) (dea) (ft) (II) (ft) (II) (ft) (II) (ft) (dea/100 II) (IIUS) (IIUS) 6213.40 64.12 30.89 5209.59 5257.99 2366.92 2441.74 2430.85 2029.64 1337.77 2.23 5982018.10 722983.56 N 70 21 10.932 W 148 11 21.032 6243.40 64.93 30.99 5222.49 5270.89 2393.00 2468.82 2457.91 2052.87 1351.70 2.72 5982041.73 722996.79 N 70 21 11.161 W 148 11 20.625 6273.40 65.19 31.34 5235.14 5283.54 2419.22 2496.02 2485.10 2076.14 1365.77 1.37 5982065.41 723010.17 N 7021 11.390 W 148 11 20.214 6303.40 64.96 31.15 5247.78 5296.18 2445.46 2523.23 2512.28 2099.40 1379.88 0.96 5982089.07 723023.59 N 70 21 11.618 W 148 11 19.801 6333.40 64.71 31.00 5260.54 5308.94 2471.63 2550.38 2539.42 2122.66 1393.90 0.95 5982112.73 723036.91 N702111.847 W1481119.391 6363.40 64.76 30.96 5273.35 5321.75 2497.76 2577.51 2566.52 2145.92 1407.87 0.21 5982136.40 723050.18 N 70 21 12.076 W 148 11 18.983 6393.40 64.58 30.82 5286.18 5334.58 2523.87 2604.63 2593.62 2169.19 1421.79 0.73 5982160.07 723063.40 N 70 21 12.305 W 14811 18.576 6423.40 64.58 30.65 5299.06 5347.46 2549.94 2631.72 2620.69 2192.48 1435.63 0.51 5982183.75 723076.55 N 70 21 12.534 W 14811 18.171 6453.40 64.72 30.84 5311.90 5360.30 2576.03 2658.83 2647.77 2215.78 1449.49 0.74 5982207.45 723089.72 N 7021 12.763 W 148 11 17.766 6483.40 64.51 30.83 5324.76 5373.16 2602.12 2685.94 2674.85 2239.05 1463.39 0.70 5982231.12 723102.92 N702112.992 W1481117.360 6513.40 65.09 30.85 5337.54 5385.94 2628.24 2713.08 2701.98 2262.36 1477.30 1.93 5982254.83 723116.13 N 70 2113.221 W 14811. 6543.40 64.65 31.05 5350.28 5398.68 2654.40 2740.24 2729.12 2285.65 1491.27 1.59 5982278.53 723129.41 N702113.450 W14811 ~ 6573.40 64.92 31.02 5363.06 5411.46 2680.55 2767.38 2756.24 2308.91 1505.26 0.90 5982302.19 723142.71 N 7021 13.679 W 148 11 16.135 6603.40 65.01 31.12 5375.75 5424.15 2706.75 2794.57 2783.41 2332.19 1519.29 0.43 5982325.87 723156.04 N702113.908 W 1481115.725 6633.40 64.83 31.26 5388.47 5436.87 2732.95 2821.74 2810.56 2355.43 1533.36 0.73 5982349.52 723169.41 N 70 2114.136 W 1481115.314 6663.40 65.13 31.29 5401.16 5449.56 2759.17 2848.92 2837.73 2378.67 1547.47 1.00 5982373.16 723182.83 N 7021 14.365 W 148 11 14.901 6693.40 64.96 31.34 5413.81 5462.21 2785.41 2876.12 2864.92 2401.90 1561.61 0.59 5982396.80 723196.28 N 7021 14.593 W 148 11 14.488 6723.40 65.27 31.64 5426.44 5474.84 2811.69 2903.34 2892.13 2425.11 1575.83 1.38 5982420.42 723209.80 N702114.821 W1481114.072 6753.40 64.94 31.72 5439.07 5487.47 2837.99 2930.55 2919.33 2448.27 1590.12 1.13 5982443.99 723223.40 N 7021 15.049 W 148 11 13.654 6783.40 65.00 31.83 5451.76 5500.16 2864.27 2957.73 2946.51 2471.38 1604.43 0.39 5982467.51 723237.02 N 70 21 15.276 W 14811 13.236 6813.40 65.17 31.93 5464.40 5512.80 2890.59 2984.94 2973.71 2494.48 1618.80 0.64 5982491.03 723250.70 N702115.504 W1481112.815 6843.40 64.95 31.95 5477.05 5525.45 2916.92 3012.14 3000.91 2517.56 1633.19 0.74 5982514.53 723264.40 N702115.731 W1481112.395 6873.40 65.03 31.96 5489.73 5538.13 2943.22 3039.33 3028.09 2540.63 1647.58 0.27 5982538.01 723278.10 N 7021 15.957 W 148 11 11.974 6903.40 64.97 31.73 5502.41 5550.81 2969.52 3066.52 3055.27 2563.73 1661.93 0.72 5982561.52 723291.76 N 70 21 16.184 W 1481111.554 6933.40 64.76 31.72 5515.15 5563.55 2995.78 3093.68 3082.43 2586.83 1676.21 0.70 5982585.03 723305.35 N 70 21 16.412 W 148 11 11.137 6963.40 65.08 31.60 5527.87 5576.27 3022.03 3120.85 3109.59 2609.96 1690.47 1.13 5982608.57 723318.92 N702116.639 W1481110.720 7003.40 65.11 31.79 5544.71 5593.11 3057.10 3157.13 3145.86 2640.83 1709.53 0.44 5982639.99 723337.06 N702116.943 W1481110.162 7103.40 65.62 31.02 5586.40 5634.80 3144.84 3248.03 3236.73 2718.41 1756.90 0.87 5982718.93 723382.10 N 7021 17.706 W 148 11 8.777 7203.40 65.23 32.52 5627.99 5676.39 3232.76 3338.97 3327.65 2795.72 1804.77 1.42 5982797.63 723427.67 N 70 21 18.466 W 148.7 7303.40 65.32 33.76 5669.82 5718.22 3321.11 3429.80 3418.48 2871.78 1854.43 1.13 5982875.11 723475.05 N 70 21 19.214 W 1481 . 25 7403.40 65.94 33.18 5711.08 5759.48 3409.83 3520.89 3509.56 2947.76 1904.66 0.81 5982952.55 723523.02 N 70 21 19.961 W 14811 4.456 7497.40 66.60 34.86 5748.91 5797.31 3493.83 3606.94 3595.60 3019.08 1952.81 1.78 5983025.25 723569.03 N 7021 20.662 W 148 11 3.048 7603.40 66.47 33.45 5791.12 5839.52 3588.79 3704.17 3692.80 3099.54 2007.40 1.23 5983107.29 723621.21 N 70 21 21.453 W 148111.452 7703.40 66.79 35.03 5830.79 5879.19 3678.47 3795.97 3784.57 3175.42 2059.05 1.49 5983184.66 723670.59 N 702122.199 W 1481059.941 7803.40 65.98 33.43 5870.85 5919.25 3767.98 3887.59 3876.17 3251.17 2110.59 1.67 5983261.90 723719.87 N 70 21 22.944 W 1481058.434 7903.40 65.73 33.59 5911.75 5960.15 3856.87 3978.84 3967.42 3327.26 2160.97 0.29 5983339.44 723767.97 N 70 21 23.692 W 1481056.961 Last GYD-GC-MS 8003.40 65.00 34.47 5953.44 6001.84 3945.60 4069.74 4058.30 3402.59 2211.83 1.08 5983416.24 723816.58 N 70 21 24.433 W 148 1055.473 First MWD 8065.16 64.82 36.47 5979.63 6028.03 4000.49 4125.67 4114.18 3448.14 2244.29 2.95 5983462.73 723847.67 N 7021 24.881 W 148 1054.524 8158.68 64.33 36.59 6019.78 6068.18 4083.66 4210.13 4198.49 3516.01 2294.56 0.54 5983532.05 723895.92 N 70 21 25.548 W 1481053.054 8256.32 64.41 35.22 6062.01 6110.41 4170.17 4298.17 4286.42 3587.31 2346.19 1.27 5983604.85 723945.41 N 70 21 26.249 W 148 10 51.544 8349.68 64.53 35.22 6102.25 6150.65 4252.77 4382.41 4370.61 3656.13 2394.77 0.13 5983675.07 723991.93 N 70 2126.926 W 1481050.123 8447.27 64.29 35.73 6144.40 6192.80 4339.14 4470.43 4458.56 3727.81 2445.85 0.53 5983748.23 724040.87 N 70 21 27.631 W 148 1048.629 8533.94 64.05 36.78 6182.17 6230.57 4415.89 4548.44 4536.47 3790.72 2491.99 1.13 5983812.47 724085.12 N 7021 28.249 W 148 1047.279 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38A\NK-38A Generated 4/6/200512:12 PM Page 3 of 7 · 't Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure It It It 8628.58 63.41 36.30 6224.05 6272.45 4499.46 4633.30 4621.20 3858.90 2542.51 0.81 5983882.11 724133.60 N 70 21 28.920 W 148 10 45.802 8723.60 63.56 34.89 6266.48 6314.88 4582.93 4718.33 4706.16 3928.04 2592.00 1.34 5983952.68 724181.02 N 70 2129.600 W 1481044.354 8818.96 62.64 35.62 6309.62 6358.02 4666.32 4803.37 4791.16 3997.48 2641.08 1.18 5984023.54 724228.03 N 70 2130.282 W 1481042.918 8916.49 62.92 36.16 6354.23 6402.63 4751.55 4890.10 4877.81 4067.74 2691.93 0.57 5984095.27 724276.77 N 7021 30.973 W 1481041.431 9008.46 64.18 38.08 6395.20 6443.60 4832.78 4972.44 4959.98 4133.39 2741.62 2.32 5984162.36 724324.50 N 70 21 31.619 W 1481039.977 Tie-In Survey (MWD) 9102.73 64.61 38.24 6435.94 6484.34 4916.88 5057.45 5044.72 4200.24 2794.15 0.00 5984230.73 724375.02 N 70 21 32.276 W 148 10 38.441 Top Window (Blind) 9163.00 64.33 38.11 6461.91 6510.31 4970.68 5111.83 5098.94 4242.99 2827.76 0.50 5984274.45 724407.35 N 7021 32.696 W 1481037.458 Base Window (Blind) 9179.00 64.51 35.99 6468.82 6517.22 4984.91 5126.27 5113.35 4254.51 2836.46 12.00 5984286.22 724415.70 N 7021 32.810 W 148 1037.203 Blind (lAB Inc Only) 9213.58 65.08 33.00 6483.55 6531.95 5015.50 5157.55 5144.63 4280.29 2854.17 7.99 5984312.52 724432.65 N 7021 33.063 W 148 1036.685 First MWD+IFR+MS 9307.56 61.61 25.05 6525.76 6574.16 5095.52 5241.50 5228.24 4353.60 2894.95 8.41 5984386.99 724471.24 N 7021 33.784 W 148 1~.2 9401.58 60.68 19.18 6571.16 6619.56 5170.44 5323.83 5308.91 4429.83 2925.95 5.56 5984464.11 724499.96 N 70 21 34.533 W 148 10 5 9495.74 60.99 20.95 6617.05 6665.45 5244.02 5406.05 5388.93 4507.05 2954.16 1.67 5984542.13 724525.88 N 70 21 35.293 W 148 1033.759 9589.00 60.70 20.24 6662.49 6710.89 5317.25 5487.50 5468.43 4583.29 2982.81 0.73 5984619.18 724552.26 N 7021 36.043 W 148 1032.921 9685.83 58.69 17.94 6711.35 6759.75 5391.42 5571.09 5549.58 4662.28 3010.16 2.92 5984698.93 724577.26 N 70 2136.819 W 1481032.120 9779.64 56.31 14.92 6761.76 6810.16 5459.84 5650.20 5625.51 4738.14 3032.56 3.72 5984775.42 724597.40 N 7021 37.565 W 148 1031.464 9875.18 54.40 13.10 6816.07 6864.47 5526.10 5728.79 5700.05 4814.39 3051.60 2.54 5984852.20 724614.18 N 70 2138.315 W 1481030.907 9969.83 52.66 10.83 6872.34 6920.74 5588.75 5804.90 5771.44 4888.83 3067.39 2.66 5984927.07 724627.76 N 70 2139.047 W 1481030.444 10065.18 51.55 8.16 6930.91 6979.31 5648.79 5880.14 5840.97 4963.03 3079.82 2.50 5985001.60 724637.98 N 70 21 39.777 W 1481030.080 10158.53 47.18 2.54 6991.71 7040.11 5702.11 5950.94 5904.46 5033.48 3086.53 6.54 5985072.22 724642.61 N 70 21 40.470 W 1481029.883 10252.69 45.96 357.54 7056.47 7104.87 5749.15 6019.30 5962.86 5101.82 3086.60 4.07 5985140.53 724640.67 N 70 2141.142 W 1481029.880 10346.30 44.70 352.43 7122.30 7170.70 5790.52 6085.84 6016.70 5168.10 3080.82 4.11 5985206.60 724632.92 N702141.794 W1481030.048 10439.53 40.95 346.55 7190.69 7239.09 5825.03 6149.18 6064.47 5230.36 3069.39 5.88 5985268.49 724619.65 N 70 21 42.406 W 1481030.382 10534.32 40.69 339.10 7262.47 7310.87 5852.42 6211.09 6106.38 5289.47 3051.13 5.14 5985327.04 724599.65 N 70 2142.987 W 1481030.915 10629.62 42.94 333.71 7333.51 7381.91 5873.91 6274.60 6144.24 5347.62 3025.66 4.45 5985384.41 724572.48 N 70 21 43.559 W 1481031.659 10722.73 42.61 330.03 7401.87 7450.27 5890.61 6337.82 6178.32 5403.37 2995.86 2.71 5985439.25 724541.04 N 70 21 44.108 W 148 1032.529 10817.35 42.77 328.15 7471.42 7519.82 5904.52 6401.97 6210.72 5458.41 2962.91 1.36 5985493.28 724506.48 N 70 21 44.649 W 1481033.492 10911.09 42.67 325.10 7540.30 7588.70 5915.64 6465.56 6240.95 5511.50 2927.93 2.21 5985545.32 724469.95 N 70 2145.172 W 1481034.515 11005.69 42.05 323.35 7610.20 7658.60 5924.14 6529.30 6269.40 5563.22 2890.68 1.41 5985595.90 724431.18 N 70 21 45.680 W 148 1.3 11099.36 41.86 323.74 7679.86 7728.26 5931.76 6591.92 6297.19 5613.59 2853.47 0.34 5985645.15 724392.50 N 70 21 46.176 W 148 1 1 11194.19 41.53 323.58 7750.67 7799.07 5939.55 6655.00 6325.80 5664.40 2816.09 0.37 5985694.83 724353.64 N 70 21 46.676 W 148 1037.783 11289.24 41.20 322.57 7822.Q1 7870.41 5946.68 6717.81 6354.21 5714.61 2778.35 0.78 5985743.90 724314.44 N 70 21 47.170 W 148 1038.886 11381.27 41.89 323.40 7890.89 7939.29 5953.52 6778.84 6382.21 5763.35 2741.61 0.96 5985791.53 724276.27 N 70 21 47.649 W 148 1039.960 11472.55 41.82 325.16 7958.88 8007.28 5961.70 6839.75 6411.81 5812.79 2706.06 1.29 5985839.89 724239.27 N 70 2148.135 W 1481040.999 11567.19 41.78 325.83 8029.43 8077.83 5971.49 6902.83 6444.08 5864.77 2670.32 0.47 5985890.80 724202.02 N 7021 48.647 W 148 1042.044 11660.77 41.08 325.39 8099.59 8147.99 5981.23 6964.75 6476.31 5915.87 2635.35 0.81 5985940.83 724165.55 N702149.150 W 1481043.066 11755.44 40.76 325.55 8171.13 8219.53 5990.84 7026.76 6508.89 5966.96 2600.20 0.36 5985990.86 724128.91 N 70 21 49.652 W 1481044.093 11847.70 40.74 326.10 8241.02 8289.42 6000.53 7086.98 6541.25 6016.78 2566.37 0.39 5986039.65 724093.62 N702150.142 W1481045.082 11943.16 39.20 323.37 8314.18 8362.58 6009.28 7148.30 6573.63 6066.85 2530.99 2.44 5986088.65 724056.78 N702150.635 W1481046.116 12037.62 37.94 318.72 8388.05 8436.45 6013.91 7207.17 6601.86 6112.64 2494.02 3.35 5986133.33 724018.46 N 702151.085 W 1481047.197 12129.68 36.66 313.40 8461.30 8509.70 6013.46 7262.93 6624.64 6152.80 2455.37 3.77 5986172.33 723978.64 N 70 21 51.480 W 1481048.327 12223.70 34.39 308.14 8537.83 8586.23 6008.03 7317.53 6642.69 6188.50 2414.07 4.05 5986206.79 723936.31 N 70 21 51.832 W 148 1049.534 12316.52 34.23 303.74 8614.51 8662.91 5998.39 7369.83 6656.09 6219.19 2371.74 2.68 5986236.21 723893.09 N 70 2152.134 W 1481050.772 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38A \NK-38A Generated 4/6/2005 12: 12 PM Page 4 of 7 · .. Comments Latitude Longitude N 70 21 52.411 W 148 1052.053 N 70 21 52.692 W 148 1053.394 12565.14 35.24 301.52 8818.42 8866.82 5962.97 7512.07 6685.33 6294.86 2251.31 0.47 5986308.28 723770.48 N 70 21 52.878 W 148 10 54.293 12596.91 35.17 301.90 8844.38 8892.78 5958.28 7530.38 6689.17 6304.48 2235.73 0.72 5986317.44 723754.62 N 70 21 52.973 W 1481054.749 12689.72 35.09 299.00 8920.29 8968.69 5943.46 7583.78 6699.49 6331.54 2189.70 1.80 5986343.12 723707.82 N 70 21 53.239 W 1481056.095 12783.83 36.46 293.65 8996.66 9045.06 5924.41 7638.77 6706.61 6355.88 2140.41 3.63 5986365.99 723657.83 N 70 21 53.479 W 1481057.536 12878.29 38.49 288.35 9071.64 9120.04 5899.58 7696.21 6709.19 6376.40 2086.78 4.03 5986384.92 723603.62 N 70 2153.681 W 1481059.104 12971.38 41.66 282.16 9142.89 9191.29 5868.39 7756.10 6706.35 6392.05 2029.00 5.47 5986398.85 723545.41 N 70 21 53.835 W 14811 0.794 13065.60 43.64 277.49 9212.21 9260.61 5830.19 7819.91 6697.96 6402.89 1966.14 3.96 5986407.82 723482.25 N 70 21 53.941 W 14811 2.632 13159.87 44.92 277.40 9279.70 9328.10 5788.67 7885.73 6687.27 6411.42 1900.88 1.36 5986414.41 723416.77 N 70 21 54.025 W 14811 4.541 13254.87 43.05 276.71 9348.05 9396.45 5746.71 7951.70 6676.75 6419.52 1835.41 2.03 5986420.58 723351.09 N 70 2154.105 W 1481.6 13350.99 43.39 274.95 9418.10 9466.50 5703.76 8017.52 6665.49 6426.21 1769.93 1.30 5986425.32 723285.45 N 70 2154.171 W 1481 1 13446.69 43.66 273.50 9487.49 9535.89 5659.38 8083.43 6653.03 6431.06 1704.20 1.08 5986428.23 723219.61 N702154.219 W1481110.293 Tie-In Survey 13476.41 43.84 273.13 9508.96 9557.36 5645.30 8103.98 6648.96 6432.25 1683.69 1.05 5986428.81 723199.07 N 7021 54.231 W 148 11 10.893 MWD+IFR+MS 13555.35 45.46 275.08 9565.11 9613.51 5607.86 8159.45 6639.02 6436.23 1628.36 2.69 5986431.16 723143.65 N 70 2154.270 W 1481112.511 13583.54 47.73 271.89 9584.49 9632.89 5593.87 8179.93 6635.24 6437.47 1607.92 11.51 5986431.79 723123.19 N 70 21 54.282 W 148 11 13.108 13614.85 49.29 272.72 9605.23 9653.63 5577.51 8203.38 6630.52 6438.41 1584.49 5.36 5986432.04 723099.74 N 7021 54.292 W 148 11 13.794 13646.43 51.76 273.24 9625.30 9673.70 5560.71 8227.75 6625.98 6439.68 1560.15 7.92 5986432.59 723075.37 N 70 21 54.304 W 148 11 14.506 13677.43 53.94 273.53 9644.02 9692.42 5543.80 8252.46 6621.63 6441.14 1535.48 7.07 5986433.32 723050.68 N 7021 54.319 W 148 11 15.227 13709.32 55.55 273.53 9662.43 9710.83 5526.03 8278.50 6617.21 6442.74 1509.49 5.05 5986434.15 723024.65 N 70 21 54.334 W 148 11 15.987 13738.86 56.76 274.90 9678.88 9727.28 5509.51 8303.03 6613.44 6444.55 1485.03 5.62 5986435.23 723000.14 N 702154.352 W 1481116.702 13770.45 58.89 275.11 9695.70 9744.10 5491.77 8329.77 6609.78 6446.88 1458.39 6.77 5986436.77 722973.45 N 7021 54.375 W 14811 17.481 13802.23 60.55 275.81 9711.73 9760.13 5473.73 8357.21 6606.36 6449.50 1431.07 5.56 5986438.58 722946.07 N 70 21 54.401 W 148 11 18.280 13832.84 62.27 276.70 9726.38 9774.78 5456.35 8384.09 6603.48 6452.43 1404.36 6.17 5986440.72 722919.28 N 70 21 54.430 W 148 11 19.062 13864.28 63.41 277.34 9740.73 9789.13 5438.54 8412.06 6600.98 6455.84 1376.60 4.05 5986443.31 722891.43 N 70 21 54.463 W 148 11 19.874 13896.38 64.40 278.20 9754.85 9803.25 5420.48 8440.89 6598.90 6459.74 1348.03 3.91 5986446.36 722862.77 N 70 21 54.502 W 14811 20.709 13927.19 66.15 278.87 9767.73 9816.13 5403.25 8468.88 6597.37 6463.90 1320.36 6.01 5986449.70 722834.98 N702154.543 W 1481121.518 13957.84 68.59 280.34 9779.53 9827.93 5386.24 8497.16 6596.48 6468.62 1292.47 9.11 5986453.59 722806.97 N 70 21 54.589 W 1481.4 13990.18 70.46 280.64 9790.84 9839.24 5368.41 8527.46 6596.12 6474.14 1262.68 5.85 5986458.23 722777.03 N 70 21 54.644 W 148 1 5 14021.79 72.44 282.53 9800.90 9849.30 5351.23 8557.42 6596.48 6480.16 1233.33 8.45 5986463.37 722747.51 N 70 21 54.703 W 1481 . 63 14054.06 73.75 283.09 9810.28 9858.68 5334.08 8588.30 6597.65 6487.00 1203.22 4.39 5986469.33 722717.22 N 70 21 54.770 W 148 11 24.944 14086.33 73.78 285.16 9819.30 9867.70 5317.46 8619.28 6599.67 6494.56 1173.18 6.16 5986475.99 722686.96 N 70 21 54.845 W 148 11 25.823 14116.73 73.35 284.41 9827.90 9876.30 5302.11 8648.44 6602.05 6502.00 1144.98 2.76 5986482.60 722658.57 N 7021 54.918 W 148 11 26.647 14149.23 73.14 285.73 9837.27 9885.67 5285.85 8679.56 6604.88 6510.10 1114.93 3.94 5986489.80 722628.29 N 70 21 54.997 W 148 11 27.526 14179.74 74.31 285.59 9845.82 9894.22 5270.81 8708.85 6607.97 6518.00 1086.73 3.86 5986496.86 722599.87 N 70 21 55.075 W 148 11 28.351 14210.99 75.94 285.93 9853.84 9902.24 5255.35 8739.05 6611.35 6526.20 1057.67 5.32 5986504.20 722570.58 N 70 2155.156 W 14811 29.201 14243.10 78.08 286.98 9861.06 9909.46 5239.66 8770.34 6615.38 6535.07 1027.66 7.39 5986512.17 722540.32 N 70 21 55.243 W 148 11 30.078 14275.74 80.56 287.93 9867.11 9915.51 5224.06 8802.41 6620.20 6544.69 997.07 8.12 5986520.89 722509.46 N 70 21 55.338 W 148 11 30.973 14307.10 82.82 288.36 9871.64 9920.04 5209.29 8833.44 6625.39 6554.35 967.58 7.33 5986529.67 722479.70 N 70 21 55.433 W 148 11 31.835 14338.62 86.47 290.67 9874.58 9922.98 5195.03 8864.81 6631.51 6564.83 938.01 13.69 5986539.28 722449.84 N 70 21 55.536 W 148 11 32.700 14371.73 88.05 293.28 9876.17 9924.57 5181.27 8897.88 6639.50 6577.21 907.35 9.21 5986550.74 722418.82 N 70 21 55.658 W 148 11 33.597 14402.69 88.73 293.90 9877.04 9925.44 5169.20 8928.83 6647.96 6589.59 878.98 2.97 5986562.28 722390.10 N 70 21 55.780 W 14811 34.426 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\NK-38\NK-38A \NK-38A Generated 4/6/200512:12 PM Page 5 of 7 .. ~ Comments Latitude Longitude N 70 21 55.913 W 148 11 35.288 N 70 21 56.053 W 14811 36.132 N 7021 56.283 W 14811 37.410 N702156.422 W1481138.126 N 70 21 56.580 W 148 11 38.912 14608.19 90.07 302.76 9878.79 9927.19 5105.71 9134.32 6724.10 6687.70 698.65 6.36 5986655.00 722206.95 N 70 21 56.745 W 14811 39.700 14639.59 90.34 301.68 9878.68 9927.08 5097.94 9165.72 6738.05 6704.44 672.08 3.55 5986670.95 722179.91 N 7021 56.909 W 148 11 40.477 14670.94 90.99 302.49 9878.32 9926.72 5090.10 9197.07 6752.02 6721.09 645.52 3.31 5986686.81 722152.87 N 7021 57.073 W 148 11 41.254 14701.59 91.20 304.26 9877.73 9926.13 5083.11 9227.71 6766.41 6737.95 619.94 5.81 5986702.90 722126.79 N 70 21 57.239 W 148 11 42.002 14733.33 91.10 304.84 9877.10 9925.50 5076.51 9259.45 6781.99 6755.95 593.80 1.85 5986720.12 722100.14 N 70 21 57.416 W 14811 42.766 14763.54 91.10 306.00 9876.52 9924.92 5070.67 9289.65 6797.33 6773.45 569.18 3.84 5986736.88 722075.02 N 702157.588 W 14811. 14797.73 91.14 307.11 9875.85 9924.25 5064.73 9323.84 6815.38 6793.81 541.73 3.25 5986756.42 722046.97 N 7021 57.788 W 148 11 14827.86 90.70 310.25 9875.36 9923.76 5060.60 9353.96 6832.32 6812.64 518.21 10.52 5986774.54 722022.91 N 70 21 57.974 W 148 11 44.977 14855.69 90.39 312.84 9875.10 9923.50 5058.17 9381.79 6849.18 6831.09 497.38 9.37 5986792.37 722001.55 N 70 21 58.155 W 148 11 45.586 14890.69 89.81 316.52 9875.04 9923.44 5057.02 9416.79 6871.96 6855.70 472.50 10.64 5986816.23 721975.95 N 70 21 58.397 W 14811 46.314 14922.41 89.87 317.91 9875.13 9923.53 5057.39 9448.51 6893.74 6878.98 450.96 4.39 5986838.86 721953.72 N 7021 58.626 W 148 11 46.944 14953.61 90.32 322.84 9875.07 9923.47 5059.46 9479.71 6916.45 6903.00 431.07 15.87 5986862.28 721933.13 N 70 21 58.862 W 148 11 47.525 14984.22 90.59 324.71 9874.83 9923.23 5063.31 9510.32 6939.99 6927.69 412.98 6.17 5986886.43 721914.32 N 70 2159.105 W 1481148.054 15016.25 91.45 328.05 9874.26 9922.66 5068.77 9542.34 6965.58 6954.36 395.25 10.77 5986912.55 721895.81 N 70 21 59.367 W 148 11 48.573 15047.26 91.52 333.18 9873.46 9921.86 5076.29 9573.34 6991.70 6981.36 380.04 16.54 5986939.09 721879.82 N 70 21 59.633 W 148 11 49.018 15078.61 90.59 333.72 9872.88 9921.28 5085.40 9604.69 7018.95 7009.40 366.03 3.43 5986966.70 721864.98 N 7021 59.909 W 148 11 49.427 15110.16 90.66 333.31 9872.54 9920.94 5094.60 9636.24 7046.43 7037.63 351.96 1.32 5986994.51 721850.08 N 70220.186 W 14811 49.839 15142.14 91.55 333.64 9871.92 9920.32 5103.90 9668.21 7074.31 7066.24 337.68 2.97 5987022.68 721834.97 N 70 22 0.468 W 148 11 50.256 15171.50 93.27 336.36 9870.68 9919.08 5113.18 9697.54 7100.28 7092.83 325.29 10.95 5987048.89 721821.79 N 70 22 0.729 W 14811 50.619 15203.24 94.92 339.97 9868.42 9916.82 5124.83 9729.20 7129.10 7122.21 313.51 12.48 5987077.90 721809.15 N 70 221.018 W 14811 50.963 15234.40 95.44 341.83 9865.60 9914.00 5137.62 9760.23 7157.96 7151.53 303.36 6.17 5987106.91 721798.14 N 70 22 1.307 W 148 11 51.260 15265.29 95.55 341.69 9862.65 9911.05 5150.71 9790.98 7186.74 7180.73 293.74 0.57 5987135.82 721787.65 N 7022 1.594 W 148 11 51.542 15297.12 95.23 343.04 9859.66 9908.06 5164.51 9822.67 7216.53 7210.93 284.14 4.34 5987165.72 721777.16 N70221.891 W1481151.822 15325.86 92.99 341 .44 9857.60 9906.00 5176.93 9851.33 7243.47 7238.23 275.39 9.57 5987192.74 721767.62 N 7022 2.159 W 148 1.8 15357.81 90.77 341.92 9856.55 9904.95 5190.48 9883.26 7273.38 7268.54 265.36 7.11 5987222.74 721756.69 N 70 22 2.457 W 148 1 2 15389.67 89.05 343.70 9856.60 9905.00 5204.57 9915.12 7303.46 7298.98 255.94 7.77 5987252.89 721746.38 N 70 22 2.757 W 14811 52.647 15418.89 88.40 346.92 9857.25 9905.65 5218.62 9944.34 7331 .44 7327.23 248.53 11.24 5987280.91 721738.14 N 70 22 3.035 W 148 11 52.864 15450.92 88.91 349.77 9858.00 9906.40 5235.49 9976.36 7362.57 7358.59 242.07 9.04 5987312.06 721730.75 N 70 22 3.343 W 148 11 53.053 15479.85 89.08 352.81 9858.51 9906.91 5251.96 10005.28 7391.00 7387.18 237.69 10.52 5987340.50 721725.52 N 70 22 3.624 W 148 11 53.181 15513.06 89.91 355.61 9858.80 9907.20 5272.25 10038.49 7423.91 7420.21 234.34 8.79 5987373.42 721721.20 N 70 22 3.949 W 148 11 53.279 15543.99 89.63 358.65 9858.92 9907.32 5292.36 1 0069.42 7454.73 7451.10 232.79 9.87 5987404.25 721718.74 N 70 22 4.253 W 148 11 53.324 15576.36 89.94 1.02 9859.05 9907.45 5314.55 10101.79 7487.08 7483.47 232.69 7.38 5987436.60 721717.69 N 70 22 4.571 W 148 11 53.327 15606.46 90.18 1.35 9859.01 9907.41 5335.69 10131.89 7517.18 7513.56 233.32 1.36 5987466.70 721717.42 N 7022 4.867 W 148 11 53.309 15638.14 90.59 1.34 9858.80 9907.20 5358.01 10163.57 7548.86 7545.23 234.06 1.29 5987498.37 721717.22 N 70 22 5.179 W 148 11 53.287 15670.42 91.73 1.30 9858.15 9906.55 5380.73 10195.84 7581.13 7577.49 234.80 3.53 5987530.64 721717.01 N 70 22 5.496 W 148 11 53.265 15701.50 92.72 0.80 9856.94 9905.34 5402.50 10226.90 7612.19 7608.55 235.37 3.57 5987561.70 721716.66 N 70 22 5.801 W 148 11 53.248 15732.95 93.24 1.45 9855.31 9903.71 5424.54 10258.31 7643.59 7639.95 235.99 2.64 5987593.10 721716.35 N 70 22 6.110 W 148 11 53.230 15764.25 93.51 1.43 9853.46 9901.86 5446.58 10289.55 7674.84 7671.18 236.78 0.86 5987624.35 721716.21 N 70 22 6.417 W 14811 53.207 SurveyEditor Ver 3.1 RT -SP3.03-HF5.00 Bld( d031 rt-546 ) NK-38\N K-38\NK-38A\NK-38A Generated 4/6/200512:12 PM Page 6 of 7 ., , Comments Latitude Longitude N 70 22 6.724 W 1481153.181 N 70 22 7.025 W 1481153.152 15858.22 93.99 2.07 9847.87 9896.27 5513.23 10383.35 7768.64 7764.94 239.78 1.63 5987718.14 721716.44 N 70 22 7.339 W 1481153.119 15888.42 93.55 2.75 9845.88 9894.28 5534.85 10413.49 7798.77 7795.04 241.05 2.68 5987748.27 721716.82 N 70 22 7.636 W 1481153.082 15919.94 93.41 2.46 9843.97 9892.37 5557.50 10444.95 7830.23 7826.47 242.48 1.02 5987779.73 721717.32 N70227.945 W 1481153.040 15952.67 93.79 3.09 9841.91 9890.31 5581.08 10477.62 7862.89 7859.10 244.06 2.24 5987812.39 721717.93 N 7022 8.265 W 148 11 52.994 15984.52 93.13 3.42 9839.99 9888.39 5604.22 10509.41 7894.67 7890.84 245.86 2.32 5987844.17 721718.80 N 70228.578 W 148 11 52.941 16015.08 91.35 2.44 9838.80 9887.20 5626.32 10539.94 7925.20 7921.34 247.42 6.65 5987874.69 721719.45 N 70 22 8.878 W 148 11 52.895 16046.44 89.94 0.86 9838.44 9886.84 5648.53 10571.30 7956.55 7952.68 248.33 6.75 5987906.05 721719.43 N70229.186 W1481152.869 16077.84 89.46 2.28 9838.61 9887.01 5670.73 10602.70 7987.95 7984.07 249.19 4.77 5987937.44 721719.36 N 70 22 9.495 W 148 11 52.844 16110.23 89.43 1.82 9838.92 9887.32 5693.83 10635.09 8020.34 8016.43 250.34 1.42 5987969.83 721719.56 N 70 22 9.813 W 14811. 16142.03 89.77 2.45 9839.14 9887.54 5716.54 10666.89 8052.14 8048.21 251.53 2.25 5988001.63 721719.81 N 70 2210.125 W 14811 16172.95 88.81 2.97 9839.53 9887.93 5738.84 10697.80 8083.05 8079.09 252.99 3.53 5988032.54 721720.35 N 70 2210.429 W 148 11 52.732 16205.06 88.57 2.44 9840.26 9888.66 5761.98 10729.91 8115.15 8111.16 254.51 1.81 5988064.63 721720.92 N 70 2210.744 W 14811 52.688 16235.78 88.33 2.05 9841.09 9889.49 5783.96 10760.61 8145.86 8141.84 255.71 1.49 5988095.34 721721.21 N 702211.046 W 14811 52.653 16268.13 88.47 2.08 9842.00 9890.40 5807.02 10792.95 8178.20 8174.16 256.87 0.44 5988127.67 721721.42 N 70 2211.364 W 148 11 52.619 16298.78 88.50 2.69 9842.81 9891.21 5829.00 10823.59 8208.83 8204.77 258.15 1.99 5988158.31 721721.79 N 702211.665 W 14811 52.581 16331.54 86.92 2.20 9844.12 9892.52 5852.50 10856.32 8241.56 8237.48 259.55 5.05 5988191.04 721722.22 N 70 22 11.987 W 148 11 52.541 16362.51 86.34 2.79 9845.94 9894.34 5874.71 10887.24 8272.48 8268.36 260.89 2.67 5988221.95 721722.65 N 70 22 12.291 W 148 11 52.501 16393.86 86.34 3.54 9847.94 9896.34 5897.45 10918.53 8303.75 8299.60 262.62 2.39 5988253.22 721723.45 N 70 22 12.598 W 148 11 52.451 16426.38 85.79 3.15 9850.17 9898.57 5921.09 10950.97 8336.19 8331.99 264.51 2.07 5988285.65 721724.39 N 70 2212.916 W 14811 52.395 16457.64 86.24 3.15 9852.34 9900.74 5943.74 10982.15 8367.36 8363.13 266.23 1.44 5988316.82 721725.18 N 70 22 13.222 W 148 11 52.345 16489.60 86.61 2.87 9854.33 9902.73 5966.86 11014.05 8399.25 8394.98 267.90 1.45 5988348.71 721725.91 N 70 22 13.536 W 148 11 52.296 16521.97 86.68 3.59 9856.23 9904.63 5990.37 11046.37 8431.56 8427.24 269.72 2.23 5988381.01 721726.78 N 70 22 13.853 W 148 11 52.243 16553.06 86.68 4.02 9858.03 9906.43 6013.16 11077.40 8462.58 8458.21 271.78 1.38 5988412.03 721727.92 N 70 2214.158 W 1481152.182 16584.20 86.96 3.53 9859.76 9908.16 6035.98 11108.50 8493.65 8489.24 273.83 1.81 5988443.10 721729.05 N702214.463 W1481152.122 16616.22 86.34 3.71 9861.63 9910.03 6059.38 11140.46 8525.60 8521.14 275.85 2.02 5988475.04 721730.12 N 70 2214.777 W 1481152.063 16646.05 85.24 4.22 9863.82 9912.22 6081.28 11170.21 8555.33 8550.82 277.90 4.06 5988504.77 721731.30 N 70 22 15.068 W 148 1113 16676.67 85.31 4.04 9866.34 9914.74 6103.80 11200.73 8585.82 8581.25 280.10 0.63 5988535.26 721732.60 N 70 2215.368 W 1481 9 Last MWD+IFR+MS 16707.58 84.72 5.46 9869.03 9917.43 6126.75 11231.52 8616.58 8611.94 282.65 4.96 5988566.00 721734.24 N702215.670 W14811 .64 TD ( Projected) 16765.00 84.72 5.46 9874.31 9922.71 6169.84 11288.70 8673.64 8668.86 288.09 0.00 5988623.05 721737.99 N 702216.229 W 14811 51.705 Survey Type: Definitive Survey NOTES: GYD GC MS - ( Gyrodata - gyro compassing m/s -- Older Gyrodata gyro multishots-plus all battery/memory tool surveys (RGS-BT). Replaces ex-BP "Gyrodata multishot into open hole" model. ) MWD - Standard -- (Measurement While Drilling with no (or no known) special corrections. The model allows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal east/west. MWD + IFR + MS - ( In-field referenced MWD with mult-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy.) Leqal Description: Northinq ey) rnUSl Eastinq eX) rnUSl Surface: 1410 FSL 854 FEL S36 T12N R15E UM 5979949.87 721706.47 Tie-In: 1409 FSL 853 FEL S36 T12N R15E UM 5979949.44 721707.16 BHL: 4799 FSL 565 FEL S25 T12N R15E UM 5988623.05 721737.99 SurveyEditor Ver 3.1 RT-SP3.03-HF5.00 Bld( d031 rt-546 ) N K-38\NK-38\NK-38A \NK-38A Generated 4/6/200512:12 PM Page 7 of 7 t SCHLUMBERGER Survey report Client........ ...........: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Niakuk Well. . . . . . . . . . . . . . . . . . . . .: NK-38A API number...............: 50-021-22540-01 Engineer............... ..: St. Amour Rig:......... ............: Nabors 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Drill Floor GL above permanent.......: 21.83 ft KB above permanent.......: N/A (Topdrive) DF above permanent.......: 48.40 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 0.00 degrees ~ C> -C. . ).J ....c. -.. Spud date. . . . . . . . . . . . . . . . : Last survey date. . . . . . . . . : Total accepted surveys...: MD of first survey.......: MD of last survey........: 11-Feb-05 09-Mar-05 268 0.00 ft 16765.00 ft . ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2004 Magnetic date............: 21-Feb-2005 Magnetic field strength..: 1153.15 HCNT Magnetic dec (+E/W-).....: 25.14 degrees Magnetic dip.............: 80.94 degrees ----- MWD survey Reference Reference G..............: Reference H. . . . . . . . . . . . . . : Reference Dip. . . . . . . . . . . . : Tolerance of G. . . . . . . . . . . : Tolerance of H..... . . . . . . : Tolerance of Dip.........: Criteria --------- 1002.68 mGal 1153.17 HCNT 80.94 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 25.14 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 25.14 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type ...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction . SCHLUMBERGER Survey Report --- -------- -------- Seq Measured # depth (ft) --- -------- -------- 1 2 3 4 5 0.00 103.40 203.40 303.40 403.40 6 7 8 9 10 503.40 603.40 703.40 803.40 903.40 11 12 13 14 15 1003.40 1103.40 1203.40 1303.40 1403.40 16 17 18 19 20 1503.40 1603.40 1703.40 1803.40 1903.40 21 22 23 24 25 2003.40 2103.40 2203.40 2303.40 2403.40 26 27 28 29 30 2503.40 2603.40 2703.40 2803.40 2903.40 ------ ------ Incl angle (deg) ------ ------ 0.00 0.81 0.99 0.96 0.56 0.38 0.41 0.49 0.38 0.30 0.31 0.31 0.35 0.44 0.45 0.66 0.92 1.17 1. 83 2.81 4.65 6.51 7.97 9.42 11.16 13.33 16.24 18.43 19.38 19.96 ------- ------- Azimuth angle (deg) ------- ------- 123.67 123.67 127.35 130.92 123.11 102.50 91. 57 83.25 52.47 45.22 44.52 25.21 29.39 22.47 12.95 13 .16 20.42 28.40 34.53 32.20 32.19 33.40 42.78 47.64 44.21 39.48 37.44 36.15 35.44 34.94 ------ ------ Course length (ft) ------ ------ 0.00 103.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 15-Mar-2005 11:57:59 -------- -------- TVD depth (ft) -------- -------- 0.00 103.40 203.38 303.37 403.36 503.36 603.35 703.35 803.35 903.35 1003.35 1103.34 1203.34 1303.34 1403.34 1503.33 1603.32 1703.31 1803.27 1903.19 2002.97 2102.49 2201.70 2300.55 2398.94 2496.66 2593.34 2688.79 2783.39 2877.56 -------- -------- Vertical section (ft) -------- -------- 0.82 1. 55 3.12 4.81 6.13 6.93 7.54 8.17 8.60 8.76 8.87 8.88 8.82 8.73 8.51 8.18 7.79 7.52 7.46 7.43 7.28 7.18 8.29 11.41 15.21 18.20 20.37 22.06 23.35 24.34 ---------------- ---------------- Displ +N/S- (ft) Displ +E/W- (ft) ---------------- ---------------- -0.45 -0.86 -1.77 -2.84 -3.66 -4.00 -4.08 -4.04 -3.79 -3.40 -3.02 -2.59 -2.08 -1.45 -0.72 0.23 1. 54 3.19 5.40 8.79 14.30 22.46 32.28 42.89 55.34 71.18 91.18 115.05 141. 33 168.84 0.68 1. 29 2.56 3.88 4.93 5.66 6.34 7.12 7.81 8.26 8.63 8.94 9.20 9.50 9.74 9.95 10.37 11.13 12.52 14.73 18.20 23.48 31.31 42.07 54.86 68.94 84.78 102.60 121. 55 140.95 Page 2 of 10 ---.------------ --------------- Total displ (ft) At Azim (deg) --------------- --------------- 0.82 1. 55 3.12 4.81 6.14 6.93 7.54 8.19 8.68 8.93 9.15 9.31 9.44 9.61 9.76 9.96 10.48 11.58 13.64 17.16 23.14 32.49 44.97 60.07 77.92 99.09 124.50 154.16 186.41 219.94 123.50 123.58 124.64 126.22 126.61 125.25 122.76 119.56 115.87 112.38 109.30 106.13 102.70 98.70 94.21 88.69 81. 55 74.01 66.66 59.17 51.84 46.27 44.12 44.45 44.75 44.09 42.92 41.73 40.70 39.85 DLS (deg/ 100f) ----- 0.00 0.78 0.19 0.07 0.41 0.24 0.08 0.10 0.25 0.09 0.01 0.10 0.05 0.10 0.07 0.21 0.28 0.29 0.68 0.98 1. 84 1. 86 1. 87 1. 62 1. 84 2.39 2.96 2.22 0.98 0.60 ------ ----- ------ Srvy Tool tool Corr type (deg) ----- ------ ------ TIP None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None . GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None . GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None SCHLUMBERGER Survey Report --- -------- -------- Seq Measured # depth (ft) ------ ------ Incl angle (deg) ------- ------- Azimuth angle (deg) ------ ------ Course length (ft) 15-Mar-2005 11:57:59 -------- -------- TVD depth (ft) -------- -------- Vertical section (ft) Page ---------------- ---------------- Displ +N/S- (ft) Displ +E/W- (ft) 3 of 10 --------------- --------------- Total displ (ft) At Azim (deg) ----- DLS (deg/ 100f) ----- ------ ------ Srvy Tool tool Corr type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- 31 32 33 34 35 3003.40 3103.40 3203.40 3303.40 3403.40 36 37 38 39 40 3503.40 3603.40 3703.40 3803.40 3903.40 41 42 43 44 45 4003.40 4103.40 4203.40 4303.40 4403.40 46 47 48 49 50 4503.40 4603.40 4703.40 4803.40 4903.40 51 52 53 54 55 5003.40 5103.40 5203.40 5303.40 5403.40 56 57 58 59 60 5503.40 5603.40 5703.40 5803.40 5903.40 21.68 24.79 27.35 29.62 31.98 35.36 38.40 40.89 41.24 40.07 39.99 39.76 39.56 39.86 39.63 39.82 39.94 39.75 39.11 40.21 42.38 44.79 47.08 49.69 51.82 53.24 55.63 56.71 59.43 61.24 33.53 30.81 31.19 29.75 33.67 37.82 40.01 35.75 37.52 34.31 32.68 35.02 32.88 30.63 31. 80 34.33 34.42 32.35 35.59 34.61 33.09 33.49 32.35 32.09 32.72 32.14 31.53 30.71 29.73 29.09 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 2971.02 3062.91 3152.72 3240.61 3326.51 3409.74 3489.72 3566.73 3642.13 3718.00 3794.57 3871.32 3948.31 4025.24 4102.13 4179.05 4255.79 4332.57 4409.82 4486.80 4561.93 4634.36 4703.91 4770.31 4833.57 4894.41 4952.57 5008.24 5061.12 5110.61 24.78 23.81 21.90 19.35 17.82 20.07 25.78 30.59 34.18 36.95 36.94 37.33 37.83 35.89 33.33 32.85 33.83 33.71 34.21 35.99 36.37 36.13 35.39 33.71 32.24 30.75 28.38 24.93 20.06 13.86 198.23 231. 65 269.31 310.42 353.93 398.84 445.50 495.87 548.58 601.31 654.94 708.18 761. 12 815.44 870.12 923.67 976.59 1030.08 1082.74 1134.96 1189.77 1247.40 1307.71 1370.96 1436.34 1503.33 1572.43 1643.55 1716.88 1792.57 160.93 181.87 204.51 228.67 255.62 288.06 325.78 364.89 404.08 442.31 477.80 513 .50 549.14 582.76 615.89 650.76 686.96 722.21 757.68 794.37 831.11 868.96 907.99 947.85 989.35 1031.91 1074.81 1117.74 1160.44 1203.10 255.33 294.51 338.16 385.55 436.58 491.99 551.91 615.65 681.34 746.46 810.71 874.76 938.54 1002.27 1066.03 1129.89 1194.00 1258.04 1321.52 1385.34 1451.31 1520.22 1592.03 1666.72 1744.10 1823.41 1904.67 1987.61 2072.27 2158.88 39.07 38.14 37.21 36.38 35.84 35.84 36.18 36.35 36.38 36.34 36.11 35.95 35.81 35.55 35.29 35.17 35.12 35.04 34.98 34.99 34.94 34.86 34.77 34.66 34.56 34.47 34.35 34.22 34.05 33.87 1. 79 3.29 2.57 2.37 3.10 4.09 3.31 3.69 1.21 2.40 1.05 1.52 1.38 1.47 0.78 1.63 0.13 1.34 2.15 1.27 2.39 2.43 2.43 2.62 2.19 1.49 2.44 1.28 2.84 1.89 ------ ------ GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None . GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None . GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None SCHLUMBERGER Survey Report 15-Mar-2005 11:57:59 Page 4 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- ---------------.- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 61 6003.40 60.67 29.29 100.00 5159.16 7.29 1868.90 1245.74 2246.03 33.69 0.60 GYD_GC_MS None 62 6033.40 60.74 29.52 30.00 5173.84 5.42 1891.69 1258.58 2272.12 33.64 0.71 GYD_GC_MS None 63 6063.40 60.77 29.19 30.00 5188.50 3.53 1914.50 1271.42 2298.22 33.59 0.96 GYD_GC_MS None 64 6093.40 61.01 29.49 30.00 5203.09 1. 63 1937.35 1284.26 2324.36 33.54 1.18 GYD_GC_MS None 65 6123.40 61.82 29.42 30.00 5217.45 -0.23 1960.29 1297.21 2350.64 33.49 2.71 GYD_GC_MS None 66 6153.40 63.21 30.01 30.00 5231.29 -1. 98 1983.40 1310.41 2377.19 33.45 4.95 GYD_GC_MS None 67 6183.40 63.49 30.64 30.00 5244.75 -3.47 2006.55 1323.94 2403.97 33.42 2.10 GYD_GC_MS None . 68 6213 .40 64.12 30.89 30.00 5257.99 -4.75 2029.68 1337.71 2430.86 33.39 2.23 GYD_GC_MS None 69 6243.40 64.93 30.99 30.00 5270.89 -5.96 2052.91 1351.64 2457.92 33.36 2.72 GYD_GC_MS None 70 6273.40 65.19 31. 34 30.00 5283.54 -7.07 2076.18 1365.72 2485.10 33.34 1. 37 GYD_GC_MS None 71 6303.40 64.96 31. 15 30.00 5296.19 -8.14 2099.44 1379.83 2512.29 33.31 0.96 GYD_GC_MS None 72 6333.40 64.71 31.00 30.00 5308.94 -9.29 2122.70 1393.84 2539.42 33.29 0.95 GYD_GC_MS None 73 6363.40 64.76 30.96 30.00 5321.75 -10.48 2145.96 1407.81 2566.53 33.27 0.21 GYD_GC_MS None 74 6393.40 64.58 30.82 30.00 5334.58 -11.72 2169.23 1421.73 2593.62 33.24 0.73 GYD_GC_MS None 75 6423.40 64.58 30.65 30.00 5347.46 -13.02 2192.52 1435.58 2620.69 33.22 0.51 GYD_GC_MS None 76 6453.40 64.72 30.84 30.00 5360.30 -14.33 2215.82 1449.44 2647.78 33.19 0.74 GYD_GC_MS None 77 6483.40 64.51 30.83 30.00 5373.17 -15.59 2239.09 1463.33 2674.86 33.17 0.70 GYD_GC_MS None 78 6513 .40 65.09 30.85 30.00 5385.94 -16.85 2262.40 1477.24 2701.98 33.14 1. 93 GYD_GC_MS None 79 6543.40 64.65 31.05 30.00 5398.68 -18.06 2285.69 1491.21 2729.12 33.12 1. 59 GYD_GC_MS None 80 6573.40 64.92 31.02 30.00 5411.46 -19.22 2308.95 1505.20 2756.24 33.10 0.90 GYD_GC_MS None 81 6603.40 65.01 31.12 30.00 5424.15 -20.38 2332.23 1519.23 2783.41 33.08 0.43 GYD_GC_MS None . 82 6633.40 64.83 31.26 30.00 5436.87 -21. 47 2355.47 1533.30 2810.56 33.06 0.73 GYD_GC_MS None 83 6663.40 65.13 31.29 30.00 5449.56 -22.53 2378.71 1547.42 2837.74 33.05 1. 00 GYD_GC_MS None 84 6693.40 64.96 31.34 30.00 5462.22 -23.56 2401.94 1561.55 2864.92 33.03 0.59 GYD_GC_MS None 85 6723.40 65.27 31.64 30.00 5474.84 -24.52 2425.15 1575.77 2892.13 33.01 1. 38 GYD_GC_MS None 86 6753.40 64.94 31.72 30.00 5487.47 -25.38 2448.31 1590.06 2919.33 33.00 1.13 GYD_GC_MS None 87 6783.40 65.00 31.83 30.00 5500.16 -26.20 2471.42 1604.37 2946.51 32.99 0.39 GYD_GC_MS None 88 6813 .40 65.17 31.93 30.00 5512.80 -26.97 2494.52 1618.74 2973.71 32.98 0.64 GYD_GC_MS None 89 6843.40 64.95 31.95 30.00 5525.45 -27.71 2517.60 1633.13 3000.91 32.97 0.74 GYD_GC_MS None 90 6873.40 65.03 31. 96 30.00 5538.13 -28.44 2540.67 1647.52 3028.09 32.96 0.27 GYD_GC_MS None SCHLUMBERGER Survey Report 15-Mar-2005 11:57:59 Page 5 of 10 --- -------- ------ ------- ------ -------- -------- ------~--------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) --- -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 91 6903.40 64.97 31.73 30.00 5550.81 -29.23 2563.77 1661.87 3055.28 32.95 0.72 GYD GC_MS None 92 6933.40 64.76 31.72 30.00 5563.55 -30.07 2586.87 1676.15 3082.43 32.94 0.70 GYD_GC_MS None 93 6963.40 65.08 31.60 30.00 5576.27 -30.94 2610.00 1690.41 3109.59 32.93 1.13 GYD_GC_MS None 94 7003.40 65.11 31.79 40.00 5593.12 -32.08 2640.87 1709.47 3145.87 32.92 0.44 GYD_GC_MS None 95 7103.40 65.62 31. 02 100.00 5634.80 -35.41 2718.45 1756.84 3236.73 32.87 0.87 GYD_GC_MS None 96 7203.40 65.23 32.52 100.00 5676.39 -38.16 2795.76 1804.72 3327.65 32.84 1. 42 GYD_GC_MS None 97 7303.40 65.32 33.76 100.00 5718.22 -38.73 2871.82 1854.37 3418.48 32.85 1.13 GYD_GC_MS None . 98 7403.40 65.94 33.18 100.00 5759.48 -38.78 2947.80 1904.61 3509.57 32.87 0.81 GYD_GC_MS None 99 7497.40 66.60 34.86 94.00 5797.31 -37.99 3019.12 1952.75 3595.60 32.89 1.78 GYD_GC_MS None 100 7603.40 66.47 33.45 106.00 5839.52 -36.88 3099.58 2007.34 3692.81 32.93 1. 23 GYD_GC_MS None 101 7703.40 66.79 35.03 100.00 5879.19 -35.69 3175.46 2058.99 3784.58 32.96 1.49 GYD_GC_MS None 102 7803.40 65.98 33.43 100.00 5919.25 -34.52 3251.21 2110.53 3876.17 32.99 1. 67 GYD_GC_MS None 103 7903.40 65.73 33.59 100.00 5960.15 -34.51 3327.30 2160.91 3967.42 33.00 0.29 GYD_GC_MS None 104 8003.40 65.00 34.47 100.00 6001.84 -33.67 3402.63 2211.78 4058.30 33.02 1. 08 GYD_GC_MS None 105 8065.16 64.82 36.47 61.76 6028.03 -31.74 3448.18 2244.23 4114.18 33.06 2.95 MWD_M None 106 8158.68 64.33 36.59 93.52 6068.18 -27.28 3516.05 2294.51 4198.49 33.13 0.54 MWD_M None 107 8256.32 64.41 35.22 97.64 6110.42 -23.59 3587.35 2346.13 4286.42 33.18 1. 27 MWD_M None 108 8349.68 64.53 35.22 93.36 6150.65 -21.06 3656.17 2394.71 4370.61 33.22 0.13 MWD_M None 109 8447.27 64.29 35.73 97.59 6192.81 -18.02 3727.85 2445.79 4458.56 33.27 0.53 MWD_M None 110 8533.94 64.05 36.78 86.67 6230.57 -14.28 3790.76 2491.93 4536.47 33.32 1.13 MWD_M None 111 8628.58 63.41 36.30 94.64 6272.46 -9.77 3858.94 2542.45 4621.20 33.38 0.81 MWD_M None . 112 8723.60 63.56 34.89 95.02 6314.88 -6.67 3928.08 2591.94 4706.16 33.42 1. 34 MWD_M None 113 8818.96 62.64 35.62 95.36 6358.02 -4.06 3997.52 2641.03 4791.16 33.45 1.18 MWD_M None 114 8916.49 62.92 36.16 97.53 6402.63 -0.45 4067.79 2691.87 4877.81 33.49 0.57 MWD_M None 115 9008.46 64.18 38.08 91. 97 6443.60 4.76 4133.43 2741.56 4959.98 33.55 2.32 MWD_M None 116 9102.73 64.61 38.24 94.27 6484.34 11.67 4200.28 2794.09 5044.73 33.63 0.48 BP - Blind TOW 117 9163.00 64.33 38.11 60.27 6510.32 16.10 4243.03 2827.70 5098.94 33.68 0.50 BP _Blind BOW 118 9179.00 64.51 35.99 16.00 6517.23 16.99 4254.55 2836.40 5113.35 33.69 12.00 MWD_ IFR_MS None 119 9213.58 65.08 33.10 34.58 6531.95 17.56 4280.32 2854.14 5144.63 33.70 7.74 MWD - IFR_MS None 120 9307.56 61. 61 25.05 93.98 6574.16 11.18 4353.58 2894.98 5228.25 33.62 8.50 MWD - IFR_MS None SCHLUMBERGER Survey Report 15-Mar-2005 11:57:59 Page -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 6 of 10 Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 121 122 123 124 125 9401.58 9495.74 9589.00 9685.83 9779.64 126 127 128 129 130 9875.18 9969.83 10065.18 10158.53 10252.69 131 132 133 134 135 10346.30 10439.53 10534.32 10629.62 10722.73 136 137 138 139 140 10817.35 10911.09 11005.69 11099.36 11194.19 141 142 143 144 145 11289.24 11381.27 11472.55 11567.19 11660.77 146 147 148 149 150 11755.44 11847.70 11943.16 12037.62 12129.68 60.68 60.99 60.70 58.69 56.31 54.40 52.66 51.55 47.18 45.96 44.70 40.95 40.69 42.94 42.61 42.77 42.67 42.05 41.86 41. 53 41. 20 41.89 41. 82 41.78 41.08 40.76 40.74 39.20 37.94 36.66 19.18 20.95 20.24 17.94 14.92 13 .10 10.83 8.16 2.54 357.54 352.43 346.55 339.10 333.71 330.03 328.15 325.10 323.35 323.74 323.58 322.57 323.40 325.16 325.83 325.39 325.55 326.10 323.37 318.72 313.40 94.02 94.16 93.26 96.83 93.81 95.54 94.65 95.35 93.35 94.16 93.61 93.23 94.79 95.30 93.11 94.62 93.74 94.60 93.67 94.83 95.05 92.03 91. 28 94.64 93.58 94.67 92.26 95.46 94.46 92.06 6619.57 6665.46 6710.89 6759.76 6810.16 6864.48 6920.74 6979.31 7040.12 7104.87 7170.70 7239.10 7310.87 7381. 92 7450.27 7519.83 7588.70 7658.61 7728.27 7799.08 7870.41 7939.29 8007.28 8077.83 8148.00 8219.53 8289.42 8362.59 8436.45 8509.70 -5.05 -24.15 -42.34 -63.12 -86.31 -112.52 -140.44 -171.03 -204.32 -241.97 -283.38 -327.28 -375.13 -428.47 -484.08 -541.94 -600.41 -660.02 -718.85 -778.06 -837.24 -894.78 -951.72 -1010.21 -1067.58 -1125.08 -1180.79 -1237.93 -1294.04 -1348.43 4429.82 4507.04 4583.28 4662.26 4738.12 4814.37 4888.82 4963.02 5033.47 5101.81 5168.08 5230.35 5289.46 5347.61 5403.36 5458.40 5511.49 5563.20 5613 .57 5664.38 5714.60 5763.33 5812.78 5864.76 5915.86 5966.94 6016.77 6066.84 6112.63 6152.79 2925.98 2954.18 2982.83 3010.19 3032.59 3051. 63 3067.42 3079.84 3086.56 3086.63 3080.85 3069.42 3051.16 3025.68 2995.89 2962.93 2927.96 2890.70 2853.49 2816.12 2778.38 2741.64 2706.08 2670.35 2635.38 2600.23 2566.40 2531.02 2494.04 2455.39 5308.92 5388.94 5468.43 5549.59 5625.51 5700.05 5771.45 5840.97 5904.46 5962.86 6016.70 6064.47 6106.39 6144.24 6178.32 6210.72 6240.95 6269.40 6297.19 6325.80 6354.21 6382.21 6411. 81 6444.08 6476.31 6508.89 6541.25 6573.63 6601.85 6624.64 33.45 33.24 33.06 32.85 32.62 32.37 32.11 31.82 31.52 31.17 30.80 30.41 29.98 29.50 29.01 28.49 27.98 27.46 26.95 26.43 25.93 25.44 24.96 24.48 24.01 23.55 23.10 22.65 22.20 21. 76 DLS (deg/ 100f) 5.56 1. 67 0.73 2.92 3.72 2.54 2.66 2.50 6.54 4.07 4.11 5.88 5.14 4.45 2.71 1. 36 2.21 1. 41 0.34 0.37 0.78 0.96 1. 29 0.47 0.81 0.36 0.39 2.44 3.35 3.77 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None SCHLUMBERGER Survey Report 15-Mar-2005 11:57:59 Page 7 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- -,-------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Az im (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 151 152 153 154 155 12223.70 12316.52 12408.73 12502.71 12565.14 156 157 158 159 160 12596.91 12689.72 12783.83 12878.29 12971.38 161 162 163 164 165 13065.60 13159.87 13254.87 13350.99 13446.69 166 167 168 169 170 13476.41 13555.35 13583.54 13614.85 13646.43 171 172 173 174 175 13677.43 13709.32 13738.86 13770.45 13802.23 176 177 178 179 180 13832.84 13864.28 13896.38 13927.19 13957.84 34.39 34.23 34.61 35.50 35.24 35.17 35.09 36.46 38.49 41.66 43.64 44.92 43.05 43.39 43.66 43.84 45.46 47.73 49.29 51. 76 53.94 55.55 56.76 58.89 60.55 62.27 63.41 64.40 66.15 68.59 308.14 303.74 301.90 301.75 301. 52 301.90 299.00 293.65 288.35 282.16 277.49 277.40 276.71 274.95 273.50 273.13 275.08 271.89 272.72 273.24 273.53 273.53 274.90 275.11 275.81 276.70 277.34 278.20 278.87 280.34 94.02 92.82 92.21 93.98 62.43 31.77 92.81 94.11 94.46 93.09 94.22 94.27 95.00 96 .12 95.70 29.72 78.94 28.19 31.31 31.58 31.00 31.89 29.54 31.59 31.78 30.61 31. 44 32.10 30.81 30.65 8586.24 8662.92 8738.98 8815.92 8866.82 8892.78 8968.69 9045.06 9120.04 9191.30 9260.61 9328.10 9396.45 9466.50 9535.89 9557.36 9613.52 9632.89 9653.63 9673.71 9692.43 9710.83 9727.29 9744.11 9760.13 9774.78 9789.13 9803.25 9816.14 9827.93 -1402.57 -1454.81 -1506.92 -1560.88 -1597.00 -1615.30 -1668.62 -1723.15 -1779.20 -1836.02 -1894.43 -1953.55 -2012.62 -2070.91 -2128.40 -2146.16 -2194.50 -2212.22 -2232.28 -2253.28 -2274.65 -2297.21 -2318.61 -2342.11 -2366.33 -2390.23 -2415.26 -2441.23 -2466.60 -2492.47 6188.49 6219.18 6247.43 6275.89 6294.84 6304.47 6331.53 6355.87 6376.39 6392.04 6402.88 6411.40 6419.51 6426.19 6431. 05 6432.24 6436.22 6437.45 6438.40 6439.67 6441.13 6442.73 6444.54 6446.87 6449.48 6452.41 6455.83 6459.73 6463.89 6468.61 2414.10 2371.77 2327.97 2282.10 2251. 34 2235.76 2189.73 2140.44 2086.81 2029.03 1966.16 1900.90 1835.43 1769.96 1704.23 1683.72 1628.39 1607.95 1584.52 1560.18 1535.51 1509.52 1485.06 1458.42 1431.10 1404.39 1376.62 1348.06 1320.39 1292.50 6642.69 6656.09 6667.07 6677.93 6685.33 6689.17 6699.49 6706.61 6709.18 6706.35 6697.96 6687.27 6676.75 6665.49 6653.03 6648.95 6639.02 6635.23 6630.51 6625.97 6621.63 6617.21 6613 .43 6609.78 6606.35 6603.48 6600.97 6598.89 6597.37 6596.47 21.31 20.88 20.44 19.98 19.68 19.53 19.08 18.61 18.12 17.61 17.07 16.51 15.96 15.40 14.84 14.67 14.20 14.02 13.83 13.62 13.41 13 .19 12.98 12.75 12.51 12.28 12.04 11.79 11.55 11. 30 DLS (deg/ 100f) 4.05 2.68 1. 20 0.95 0.47 0.72 1. 80 3.63 4.03 5.47 3.96 1. 36 2.03 1. 30 1. 08 1. 05 2.69 11.51 5.36 7.92 7.07 5.05 5.62 6.77 5.56 6.17 4.05 3.91 6.01 9.11 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- ------ ------- ------ Seq Measured # depth (ft) -------- -------- 181 182 183 184 185 13990.18 14021.79 14054.06 14086.33 14116.73 186 187 188 189 190 14149.23 14179.74 14210.99 14243.10 14275.74 191 192 193 194 195 14307.10 14338.62 14371.73 14402.69 14435.13 196 197 198 199 200 14467.31 14516.88 14545.18 14576.49 14608.19 201 202 203 204 205 14639.59 14670.94 14701.59 14733.33 14763.54 206 207 208 209 210 14797.73 14827.86 14855.69 14890.69 14922.41 Incl angle (deg) ------ ------ 70.46 72.44 73.75 73.78 73.35 73.14 74.31 75.94 78.08 80.56 82.82 86.47 88.05 88.73 90.17 89.52 89.14 89.38 89.52 90.07 90.34 90.99 91.20 91.10 91.10 91.14 90.70 90.39 89.81 89.87 Azimuth angle (deg) ------- ------- 280.64 282.53 283.09 285.16 284.41 285.73 285.59 285.93 286.98 287.93 288.36 290.67 293.28 293.90 295.47 297.08 299.23 300.89 300.82 302.76 301.68 302.49 304.26 304.84 306.00 307.11 310.25 312.84 316.52 317.91 Course length (ft) ------ ------ 32.34 31.61 32.27 32.27 30.40 32.50 30.51 31. 25 32.11 32.64 31.36 31. 52 33.11 30.96 32.44 32.18 49.57 28.30 31.31 31.70 31. 40 31.35 30.65 31. 74 30.21 34.19 30.13 27.83 35.00 31.72 15-Mar-2005 11:57:59 -------- -------- TVD depth (ft) -------- -------- 9839.24 9849.30 9858.68 9867.71 9876.31 9885.68 9894.23 9902.25 9909.47 9915.52 9920.05 9922.99 9924.57 9925.44 9925.75 9925.84 9926.42 9926.79 9927.09 9927.20 9927.09 9926.72 9926.14 9925.50 9924.92 9924.25 9923.77 9923.50 9923.44 9923.53 -------- -------- Vertical section (ft) -------- -------- -2520.35 -2548.15 -2577.04 -2606.26 -2633.88 -2663.40 -2691.28 -2720.05 -2749.96 -2780.78 -2810.70 -2841.15 -2873.55 -2904.04 -2936.09 -2968.01 -3017.36 -3045.61 -3076.88 -3108.57 -3139.96 -3171.29 -3201.94 -3233.67 -3263.85 -3297.99 -3327.99 -3355.54 -3389.87 -3420.68 ---------------- ---------------- Displ +N/S- (ft) Displ +E/W- (ft) ---------------- ---------------- 6474.12 6480.15 6486.99 6494.55 6501.99 6510.08 6517.99 6526.19 6535.05 6544.68 6554.34 6564.82 6577.20 6589.58 6603.13 6617.37 6640.76 6654.93 6670.99 6687.69 6704.43 6721.08 6737.94 6755.94 6773.44 6793.80 6812.63 6831.08 6855.69 6878.97 1262.71 1233.35 1203.25 1173.20 1145.01 1114.96 1086.76 1057.70 1027.69 997.10 967.61 938.04 907.37 879.01 849.54 820.69 776.99 752.50 725.62 698.68 672.11 645.55 619.96 593.83 569.21 541.75 518.24 497.41 472.53 450.99 Page 8 of 10 --------------- --------------- Total displ (ft) At Azim (deg) --------------- --------------- 6596.11 6596.47 6597.64 6599.67 6602.04 6604.87 6607.97 6611.35 6615.37 6620.20 6625.38 6631.50 6639.49 6647.95 6657.55 6668.07 6686.06 6697.34 6710.34 6724.09 6738.04 6752.01 6766.40 6781. 98 6797.32 6815.37 6832.31 6849.17 6871.95 6893.73 11.04 10.78 10.51 10.24 9.99 9.72 9.47 9.21 8.94 8.66 8.40 8.13 7.85 7.60 7.33 7.07 6.67 6.45 6.21 5.96 5.72 5.49 5.26 5.02 4.80 4.56 4.35 4.16 3.94 3.75 DLS (deg/ 100f) 5.85 8.45 4.39 6.16 2.76 3.94 3.86 5.32 7.39 8.12 7.33 13.69 9.21 2.97 6.57 5.40 4.40 5.93 0.50 6.36 3.55 3.31 5.81 1. 85 3.84 3.25 10.52 9.37 10.64 4.39 ------ ------ Srvy Tool tool Corr type (deg) ----- ------ ------ MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None SCHLUMBERGER Survey Report 15-Mar-2005 11:57:59 Page 9 of 10 -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 211 212 213 214 215 14953.61 14984.22 15016.25 15047.26 15078.61 216 217 218 219 220 15110.16 15142.14 15171.50 15203.24 15234.40 221 222 223 224 225 15265.29 15297.12 15325.86 15357.81 15389.67 226 227 228 229 230 15418.89 15450.92 15479.85 15513 . 06 15543.99 231 232 233 234 235 15576.36 15606.46 15638.14 15670.42 15701.50 236 237 238 239 240 15732.95 15764.25 15795.50 15826.17 15858.22 90.32 90.59 91.45 91.52 90.59 90.66 91. 55 93.27 94.92 95.44 95.55 95.23 92.99 90.77 89.05 88.40 88.91 89.08 89.91 89.63 89.94 90.18 90.59 91. 73 92.72 93.24 93.51 93.00 93.48 93.99 322.84 324.71 328.05 333.18 333.72 333.31 333.64 336.36 339.97 341.83 341.69 343.04 341. 44 341.92 343.70 346.92 349.77 352.81 355.61 358.65 1. 02 1. 35 1. 34 1. 30 0.80 1. 45 1. 43 1. 80 1. 95 2.07 31. 20 30.61 32.03 31. 01 31.35 31. 55 31. 98 29.36 31.74 31.16 30.89 31. 83 28.74 31. 95 31. 86 29.22 32.03 28.93 33.21 30.93 32.37 30.10 31. 68 32.28 31.08 31. 45 31. 30 31.25 30.67 32.05 9923.48 9923.24 9922.67 9921.86 9921.29 9920.94 9920.32 9919.09 9916.82 9914.01 9911.05 9908.06 9906.00 9904.95 9905.00 9905.65 9906.41 9906.91 9907.21 9907.33 9907.45 9907.42 9907.21 9906.55 9905.35 9903.71 9901.87 9900.09 9898.36 9896.27 -3450.53 -3479.24 -3508.74 -3536.33 -3563.48 -3590.80 -3618.50 -3643.51 -3669.54 -3694.19 -3718.34 -3743.01 -3765.37 -3790.47 -3815.12 -3836.89 -3859.59 -3879.02 -3900.05 -3918.39 -3936.33 -3952.42 -3969.28 -3986.47 -4003.13 -4019.95 -4036.53 -4053.01 -4069.07 -4085.78 6902.99 6927.68 6954.35 6981.35 7009.39 7037.62 7066.23 7092.81 7122.20 7151.52 7180.72 7210.92 7238.22 7268.53 7298.96 7327.22 7358.58 7387.16 7420.20 7451.09 7483.46 7513 .55 7545.22 7577.48 7608.53 7639.94 7671.17 7702.36 7732.96 7764.92 431.09 413.01 395.28 380.07 366.06 351.99 337.71 325.32 313.54 303.39 293.77 284.17 275.42 265.39 255.97 248.56 242.09 237.72 234.37 232.82 232.72 233.35 234.09 234.83 235.40 236.02 236.80 237.68 238.69 239.81 6916.44 6939.98 6965.57 6991.69 7018.94 7046.42 7074.30 7100.27 7129.09 7157.95 7186.73 7216.52 7243.46 7273.37 7303.45 7331.43 7362.56 7390.99 7423.90 7454.72 7487.07 7517.17 7548.85 7581.12 7612.17 7643.58 7674.83 7706.02 7736.65 7768.63 3.57 3.41 3.25 3.12 2.99 2.86 2.74 2.63 2.52 2.43 2.34 2.26 2.18 2.09 2.01 1. 94 1. 88 1. 84 1. 81 1. 79 1. 78 1. 78 1. 78 1. 78 1. 77 1. 77 1. 77 1. 77 1. 77 1. 77 DLS (deg/ 100f) 15.87 6.17 10.77 16.54 3.43 1. 32 2.97 10.95 12.48 6.17 0.57 4.34 9.57 7.11 7.77 11.24 9.04 10.52 8.79 9.87 7.38 1. 36 1. 29 3.53 3.57 2.64 0.86 2.02 1. 64 1. 63 ------ ------ Srvy Tool tool Corr type (deg) ------ ------ MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . .. .. SCHLUMBERGER Survey Report --- -------- -------- Seq Measured # depth (ft) -------- --- -------- 241 242 243 244 245 15888.42 15919.94 15952.67 15984.52 16015.08 246 247 248 249 250 16046.44 16077.84 16110.23 16142.03 16172.95 251 252 253 254 255 16205.06 16235.78 16268.13 16298.78 16331.54 256 257 258 259 260 16362.51 16393.86 16426.38 16457.64 16489.60 261 262 263 264 265 16521.97 16553.06 16584.20 16616.22 16646.05 266 267 268 16676.67 16707.58 16765.00 ------ ------ Incl angle (deg) ------ ------ 93.55 93.41 93.79 93.13 91.35 89.94 89.46 89.43 89.77 88.81 88.57 88.33 88.47 88.50 86.92 86.34 86.34 85.79 86.24 86.61 86.68 86.68 86.96 86.34 85.24 85.31 84.72 84.72 ------- ------- Azimuth angle (deg) ------- ------- 2.75 2.46 3.09 3.42 2.44 0.86 2.28 1. 82 2.45 2.97 2.44 2.05 2.08 2.69 2.20 2.79 3.54 3.15 3.15 2.87 3.59 4.02 3.53 3.71 4.22 4.04 5.46 5.46 [(c)2005 IDEAL ID8_1C_02J ------ ------ Course length (ft) ------ ------ 30.20 31. 52 32.73 31.85 30.56 31. 36 31.40 32.39 31.80 30.92 32.11 30.72 32.35 30.65 32.76 30.97 31.35 32.52 31.26 31. 96 32.37 31.09 31. 14 32.02 29.83 30.62 30.91 57.42 15-Mar-2005 11:57:59 -------- -------- TVD depth (ft) -------- -------- 9894.29 9892.38 9890.32 9888.40 9887.20 9886.85 9887.01 9887.33 9887.55 9887.93 9888.67 9889.50 9890.40 9891.21 9892.52 9894.34 9896.34 9898.57 9900.75 9902.74 9904.63 9906.43 9908.16 9910.03 9912.22 9914.75 9917.43 9922.72 -------- -------- Vertical section (ft) -------- -------- -4101.34 -4117.49 -4134.18 -4150.19 -4165.72 -4182.27 -4198.88 -4215.78 -4232.33 -4248.15 -4264.59 -4280.52 -4297.39 -4313 .22 -4330.10 -4346.03 -4361.83 -4378.13 -4393.89 -4410.07 -4426.36 -4441.73 -4457.15 -4473.07 -4487.74 -4502.71 -4517.52 -4544.39 Page 10 of 10 ---------------- ---------------- Displ +N/S- (ft) Displ +E/W- (ft) ---------------- ---------------- 7795.03 7826.46 7859.09 7890.83 7921.32 7952.67 7984.05 8016.42 8048.20 8079.08 8111.15 8141.83 8174.15 8204.76 8237.46 8268.35 8299.59 8331. 98 8363.12 8394.97 8427.23 8458.20 8489.22 8521.13 8550.80 8581.24 8611.93 8668.84 241. 07 242.50 244.09 245.89 247.45 248.35 249.21 250.37 251.56 253.02 254.53 255.74 256.90 258.18 259.57 260.92 262.65 264.54 266.25 267.93 269.75 271.81 273.86 275.87 277.93 280.13 282.68 288.12 --------------- --------------- Total displ (ft) At Azim (deg) --------------- --------------- 7798.76 7830.22 7862.88 7894.66 7925.19 7956.55 7987.94 8020.33 8052.13 8083.04 8115.14 8145.85 8178.19 8208.82 8241.55 8272.47 8303.74 8336.18 8367.35 8399.24 8431.55 8462.57 8493.64 8525.59 8555.32 8585.81 8616.56 8673.63 1. 77 1. 77 1. 78 1. 78 1. 79 1. 79 1. 79 1. 79 1. 79 1. 79 1. 80 1. 80 1. 80 1. 80 1. 80 1. 81 1. 81 1. 82 1. 82 1. 83 1. 83 1. 84 1. 85 1. 85 1. 86 1. 87 1. 88 1. 90 DLS (deg/ 100f) 2.68 1. 02 2.24 2.32 6.65 6.75 4.77 1. 42 2.25 3.53 1. 81 1. 49 0.44 1. 99 5.05 2.67 2.39 2.07 1. 44 1. 45 2.23 1. 38 1. 81 2.02 4.06 0.63 4.96 0.00 ----- ------ ------ Srvy Tool tool Corr type (deg) ----- ------ ------ MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None MWD_IFR_MS None . MWD_IFR_MS None MWD_IFR_MS None Projection To TD .. SCHLUMBERGER Survey report Client... ........... .....: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Niakuk Well................... ..: NK-38APB1 API number............. ..: 50-029-22540-70 Engineer.............. ...: M. Perdomo RIG:.... .................: Nabors 9ES STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions... ..: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: MEAN SEA LEVEL Depth reference..........: Driller's Pipe Tally GL above permanent.......: 19.00 ft KB above permanent.......: N/A Top Drive DF above permanent.......: 48.40 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)..... ...: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).... .....: -999.25 ft Departure (+E/W-). .......: -999.25 ft Azimuth from rotary table to target: 329.24 degrees ~ o r - , )oJ J: [(c)2005 IDEAL ID8_1C_02] Spud da te. . . . . . . . . . . . . . . . : Last survey date.........: Total accepted surveys...: MD of first survey.......: MD of last survey........: ll-Feb-05 26-Feb-05 174 0.00 ft 14189.00 ft . ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2004 Magnetic date............: 21-Feb-2005 Magnetic field strength..: 1153.17 HCNT Magnetic dec (+E/W-).....: 25.14 degrees Magnetic dip.............: 80.94 degrees ----- GYD_GC_MS survey Reference Criteria --------- Reference G..............: 1002.68 mGal Reference H..............: 1153.17 HCNT Reference Dip............: 80.94 degrees Tolerance of G. ..........: (+/-) 2.50 mGal Tolerance of H...........: (+/-) 6.00 HCNT Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-). ....: 25.14 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 25.14 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type...: I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction . SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 0.00 103.40 203.40 303.40 403.40 0.08 0.81 0.99 0.96 0.56 0.38 0.41 0.49 0.38 0.30 0.31 0.31 0.35 0.44 0.45 0.66 0.92 1.17 1. 83 2.81 4.65 6.51 7.97 9.42 11.16 13.33 16.24 18.43 19.38 19.96 123.67 123.67 127.35 130.92 123.11 102.50 91. 57 83.25 52.47 45.22 44.52 25.21 29.39 22.47 12.95 13 .16 20.42 28.40 34.53 32.20 32.19 33.40 42.78 47.64 44.21 39.48 37.44 36.15 35.44 34.94 [(c)2005 IDEAL ID8_1C_02] 503.40 603.40 703.40 803.40 903.40 1003.40 1103.40 1203.40 1303.40 1403.40 1503.40 1603.40 1703.40 1803.40 1903.40 2003.40 2103.40 2203.40 2303.40 2403.40 2503.40 2603.40 2703.40 2803.40 2903.40 0.00 103.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 0.00 103.40 203.38 303.37 403.36 503.36 603.35 703.35 803.35 903.35 1003.35 1103.34 1203.34 1303.34 1403.34 1503.33 1603.32 1703.31 1803.27 1903.19 2002.97 2102.49 2201.70 2300.55 2398.93 2496.66 2593.34 2688.79 2783.39 2877.56 -0.73 -1. 46 -2.90 -4.49 -5.73 -6.39 -6.81 -7.18 -7.31 -7.21 -7.08 -6.86 -6.56 -6.17 -5.66 -4.96 -4.04 -3.02 -1. 83 -0.04 2.91 7.23 11. 66 15.27 19.43 25.84 34.93 46.32 59.22 72.94 -0.45 -0.90 -1.81 -2.88 -3.70 -4.04 -4.12 -4.08 -3.83 -3.44 -3.06 -2.63 -2.12 -1. 49 -0.76 0.19 1. 50 3.15 5.36 8.75 14.26 22.42 32.24 42.85 55.30 71.14 91.14 115.01 141.29 168.80 0.68 1. 35 2.62 3.94 4.99 5.72 6.40 7.18 7.87 8.32 8.69 9.00 9.26 9.56 9.80 10.01 10.43 11.19 12.58 14.79 18.26 23.54 31.37 42.13 54.92 69.00 84.84 102.66 121. 61 141.01 0.82 1. 62 3.19 4.89 6.21 7.00 7.61 8.26 8.75 9.00 9.22 9.37 9.50 9.68 9.82 10.02 10.53 11.63 13.68 17.19 23.17 32.51 44.99 60.09 77.94 99.10 124.51 154.17 186.42 219.95 123.50 123.58 124.62 126.18 126.58 125.23 122.77 119.60 115.93 112.47 109.41 106.27 102.86 98.88 94.42 88.93 81.81 74.28 66.91 59.39 52.01 46.39 44.21 44.51 44.80 44.13 42.95 41.75 40.72 39.87 DLS (deg/ 100f) 0.00 0.71 0.19 0.07 0.41 0.24 0.08 0.10 0.25 0.09 0.01 0.10 0.05 0.10 0.07 0.21 0.28 0.29 0.68 0.98 1. 84 1. 86 1. 87 1. 62 1. 84 2.39 2.96 2.22 0.98 0.60 Srvy Tool tool Corr type (deg) ------ ------ ------ ------ TIP None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS None GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS None None None None None . None None None None None None None None None None None. None None None None None None None None None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 3003.40 3103.40 3203.40 3303.40 3403.40 3503.40 3603.40 3703.40 3803.40 3903.40 4003.40 4103.40 4203.40 4303.40 4403.40 4503.40 4603.40 4703.40 4803.40 4903.40 5003.40 5103.40 5203.40 5303.40 5403.40 5503.40 5603.40 5703.40 5803.40 5903.40 21. 68 24.79 27.35 29.62 31.98 35.36 38.40 40.89 41. 24 40.07 39.99 39.76 39.56 39.86 39.63 39.82 39.94 39.75 39.11 40.21 42.38 44.79 47.08 49.69 51. 82 53.24 55.63 56.71 59.43 61. 24 33.53 30.81 31. 19 29.75 33.67 37.82 40.01 35.75 37.52 34.31 32.68 35.02 32.88 30.63 31. 80 34.33 34.42 32.35 35.59 34.61 33.09 33.49 32.35 32.09 32.72 32.14 31. 53 30.71 29.73 29.09 [(c)2005 IDEAL ID8_1C_02] 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 2971.02 3062.91 3152.72 3240.61 3326.51 3409.74 3489.72 3566.73 3642.13 3718.00 3794.57 3871.32 3948.31 4025.24 4102.13 4179.05 4255.79 4332.57 4409.82 4486.80 4561.93 4634.36 4703.91 4770.31 4833.57 4894.41 4952.56 5008.24 5061.12 5110.61 87.98 105.97 126.76 149.73 173.33 195.34 216.14 239.42 264.67 290.44 318.37 345.86 373.12 402.61 432.65 460.83 487.79 515.73 542.84 568.95 597.26 627.42 659.29 693.25 728.21 764.01 801.45 840.60 881.78 925.00 198.19 231.61 269.27 310.38 353.89 398.80 445.46 495.83 548.54 601.27 654.90 708.14 761.08 815.40 870.08 923.63 976.55 1030.04 1082.70 1134.92 1189.73 1247.36 1307.67 1370.92 1436.30 1503.29 1572.39 1643.51 1716.84 1792.53 160.99 181.93 204.57 228.73 255.68 288.12 325.84 364.95 404.14 442.37 477.86 513.56 549.20 582.82 615.95 650.82 687.02 722.27 757.74 794.43 831.17 869.02 908.05 947.91 989.41 1031.97 1074.87 1117.80 1160.50 1203.16 255.34 294.52 338.16 385.56 436.59 491. 99 551.91 615.65 681.34 746.47 810.71 874.76 938.54 1002.27 1066.04 1129.89 1194.00 1258.04 1321. 52 1385.34 1451.31 1520.22 1592.03 1666.72 1744.10 1823.41 1904.67 1987.61 2072.27 2158.88 39.09 38.15 37.22 36.39 35.85 35.85 36.18 36.35 36.38 36.34 36.12 35.95 35.81 35.56 35.30 35.17 35.13 35.04 34.99 34.99 34.94 34.86 34.78 34.66 34.56 34.47 34.36 34.22 34.06 33.87 DLS (deg/ 100f) 1. 79 3.29 2.57 2.37 3.10 4.09 3.31 3.69 1. 21 2.40 1. 05 1. 52 1. 38 1. 47 0.78 1. 63 0.13 1. 34 2.15 1. 27 2.39 2.43 2.43 2.62 2.19 1. 49 2.44 1. 28 2.84 1. 89 Srvy Tool tool Corr type ( deg) GYD_GC MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS ------ ------ ------ ------ None None None None None None None None None None . None None None None None None None None None None None None . None None None None None None None None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- ----- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 61 62 63 64 65 6003.40 6033.40 6063.40 6093.40 6123.40 66 67 68 69 70 6153.40 6183.40 6213.40 6243.40 6273.40 71 72 73 74 75 6303.40 6333.40 6363.40 6393.40 6423.40 76 77 78 79 80 6453.40 6483.40 6513 .40 6543.40 6573.40 81 82 83 84 85 6603.40 6633.40 6663.40 6693.40 6723.40 86 87 88 89 90 6753.40 6783.40 6813.40 6843.40 6873.40 60.67 60.74 60.77 61. 01 61. 82 63.21 63.49 64.12 64.93 65.19 64.96 64.71 64.76 64.58 64.58 64.72 64.51 65.09 64.65 64.92 65.01 64.83 65.13 64.96 65.27 64.94 65.00 65.17 64.95 65.03 29.29 29.52 29.19 29.49 29.42 30.01 30.64 30.89 30.99 31. 34 31.15 31. 00 30.96 30.82 30.65 30.84 30.83 30.85 31.05 31. 02 31. 12 31. 26 31.29 31. 34 31. 64 31.72 31.83 31.93 31. 95 31. 96 [(c)2005 IDEAL ID8_1C_02] 100.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 5159.16 5173.84 5188.50 5203.09 5217.45 5231.29 5244.75 5257.99 5270.89 5283.54 5296.19 5308.94 5321.75 5334.58 5347.46 5360.30 5373.17 5385.94 5398.68 5411.46 5424.15 5436.87 5449.56 5462.22 5474.84 5487.47 5500.16 5512.80 5525.45 5538.13 968.78 981.80 994.84 1007.91 1020.99 1034.11 1047.07 1059.91 1072.75 1085.55 1098.32 1111.13 1123.98 1136.86 1149.79 1162.72 1175.61 1188.52 1201.40 1214.22 1227.06 1239.83 1252.58 1265.32 1277.99 1290.58 1303.12 1315.62 1328.10 1340.56 1868.86 1891.65 1914.46 1937.31 1960.25 1983.36 2006.51 2029.64 2052.87 2076.14 2099.40 2122.66 2145.92 2169.19 2192.48 2215.78 2239.05 2262.36 2285.65 2308.91 2332.19 2355.43 2378.67 2401.90 2425.11 2448.27 2471.38 2494.48 2517.56 2540.63 1245.80 1258.64 1271.48 1284.32 1297.27 1310.47 1324.00 1337.77 1351.70 1365.78 1379.89 1393.90 1407.87 1421.79 1435.64 1449.50 1463.39 1477.30 1491.27 1505.26 1519.29 1533.36 1547.48 1561.61 1575.83 1590.12 1604.43 1618.80 1633.19 1647.58 2246.03 2272.12 2298.22 2324.36 2350.64 2377.19 2403.97 2430.86 2457.92 2485.10 2512.29 2539.42 2566.53 2593.62 2620.69 2647.78 2674.86 2701.98 2729.12 2756.24 2783.41 2810.56 2837.74 2864.92 2892.13 2919.33 2946.51 2973.71 3000.91 3028.09 33.69 33.64 33.59 33.54 33.50 33.45 33.42 33.39 33.36 33.34 33.32 33.29 33.27 33.24 33.22 33.19 33.17 33.14 33.12 33.10 33.08 33.06 33.05 33.03 33.02 33.00 32.99 32.98 32.97 32.96 DLS (deg/ 100f) 0.60 0.71 0.96 1.18 2.71 4.95 2.10 2.23 2.72 1.37 0.96 0.95 0.21 0.73 0.51 0.74 0.70 1. 93 1. 59 0.90 0.43 0.73 1. 00 0.59 1. 38 1.13 0.39 0.64 0.74 0.27 Srvy Tool tool Corr type (deg) GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS ------ ------ ------ ------ None None None None None None None None None None . None None None None None None None None None None None. None None None None None None None None None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) -------- ------ ------- ------ -------- ------ ------- ------ 91 92 93 94 95 6903.40 6933.40 6963.40 7003.40 7103.40 96 97 98 99 100 7203.40 7303.40 7403.40 7497.40 7603.40 101 102 103 104 105 7703.40 7803.40 7903.40 8003.40 8065.16 106 107 108 109 110 111 112 113 114 115 8158.68 8256.32 8349.68 8447.27 8533.94 8628.58 8723.60 8818.96 8916.49 9008.46 116 117 118 119 120 9102.73 9163.00 9179.00 9213.58 9307.56 64.97 64.76 65.08 65.11 65.62 65.23 65.32 65.94 66.60 66.47 66.79 65.98 65.73 65.00 64.82 64.33 64.41 64.53 64.29 64.05 63.41 63.56 62.64 62.92 64.18 64.61 64.33 64.51 65.08 61. 61 31.73 31.72 31.60 31.79 31.02 32.52 33.76 33.18 34.86 33.45 35.03 33.43 33.59 34.47 36.47 36.59 35.22 35.22 35.73 36.78 36.30 34.89 35.62 36.16 38.08 38.24 38.11 35.99 33.00 25.05 [(c)2005 IDEAL ID8_1C_02] 30.00 30.00 30.00 40.00 100.00 100.00 100.00 100.00 94.00 106.00 100.00 100.00 100.00 100.00 61.76 93.52 97.64 93.36 97.59 86.67 94.64 95.02 95.36 97.53 91. 97 94.27 60.27 16.00 34.58 93.98 TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Az im (deg) -------- -------- ---------------- ---~----------- -------- -------- ---------------- --------------- 5550.81 5563.55 5576.27 5593.12 5634.80 5676.39 5718.22 5759.48 5797.31 5839.52 5879.19 5919.25 5960.15 6001.84 6028.03 6068.18 6110.42 6150.65 6192.81 6230.57 6272.46 6314.88 6358.02 6402.63 6443.60 6484.34 6510.32 6517.23 6531.95 6574.16 1353.07 1365.62 1378.20 1394.98 1437.42 1479.37 1519.33 1558.93 1595.59 1636.81 1675.61 1714.34 1753.95 1792.67 1815.21 1847.82 1882.69 1916.98 1952.45 1982.92 2015.67 2049.77 2084.34 2118.71 2149.71 2180.28 2199.83 2205.28 2218.38 2260.51 2563.73 2586.83 2609.96 2640.83 2718.41 2795.72 2871.78 2947.76 3019.08 3099.54 3175.42 3251.17 3327.26 3402.59 3448.14 3516.01 3587.31 3656.13 3727.81 3790.72 3858.90 3928.04 3997.48 4067.75 4133.39 4200.24 4242.99 4254.51 4280.29 4353.60 1661.93 1676.21 1690.47 1709.53 1756.90 1804.78 1854.43 1904.67 1952.81 2007.40 2059.05 2110.59 2160.97 2211.84 2244.29 2294.57 2346.19 2394.77 2445.85 2491.99 2542.51 2592.00 2641.09 2691.93 2741.62 2794.15 2827.76 2836.46 2854.17 2894.95 3055.28 3082.43 3109.59 3145.87 3236.73 3327.65 3418.48 3509.57 3595.60 3692.81 3784.57 3876.17 3967.42 4058.30 4114.18 4198.49 4286.42 4370.61 4458.56 4536.47 4621.20 4706.16 4791.16 4877.81 4959.98 5044.73 5098.94 5113.35 5144.63 5228.25 32.95 32.94 32.93 32.92 32.87 32.84 32.85 32.87 32.90 32.93 32.96 32.99 33.00 33.03 33.06 33.13 33.19 33.22 33.27 33.32 33.38 33.42 33.45 33.50 33.56 33.63 33.68 33.69 33.70 33.62 DLS (deg/ 100f) 0.72 0.70 1.13 0.44 0.87 1. 42 1.13 0.81 1. 78 1. 23 1. 49 1. 67 0.29 1. 08 2.95 0.54 1.27 0.13 0.53 1.13 0.81 1. 34 1.18 0.57 2.32 0.48 0.50 12.00 7.99 8.41 Srvy Tool tool Corr type (deg) GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS GYD_GC_MS MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD ------ ------ ------ ------ None None None None None None . None None None None None None None None None None None None None None None None . None None None MWD None BP_Blind TOW BP _Blind BOW MWD_IFR_MS None MWD_IFR_MS None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 121 122 123 124 125 9401.58 9495.74 9589.00 9685.83 9779.64 126 127 128 129 130 9875.18 9969.83 10065.18 10158.53 10252.69 131 132 133 134 135 10346.30 10439.53 10534.32 10629.62 10722.73 136 137 138 139 140 10817.35 10911.09 11005.69 11099.36 11194.19 141 142 143 144 145 11289.24 11381.27 11472.55 11567.19 11660.77 146 147 148 149 150 11755.44 11847.70 11943.16 12037.62 12129.68 60.68 60.99 60.70 58.69 56.31 54.40 52.66 51. 55 47.18 45.96 44.70 40.95 40.69 42.94 42.61 42.77 42.67 42.05 41. 86 41. 53 41.20 41. 89 41. 82 41. 78 41.08 40.76 40.74 39.20 37.94 36.66 19.18 20.95 20.24 17.94 14.92 13.10 10.83 8.16 2.54 357.54 352.43 346.55 339.10 333.71 330.03 328.15 325.10 323.35 323.74 323.58 322.57 323.40 325.16 325.83 325.39 325.55 326.10 323.37 318.72 313.40 [(c)2005 IDEAL ID8_1C_02] 94.02 94.16 93.26 96.83 93.81 95.54 94.65 95.35 93.35 94.16 93.61 93.23 94.79 95.30 93.11 94.62 93.74 94.60 93.67 94.83 95.05 92.03 91.28 94.64 93.58 94.67 92.26 95.46 94.46 92.06 6619.57 6665.46 6710.89 6759.75 6810.16 6864.48 6920.74 6979.31 7040.12 7104.87 7170.70 7239.09 7310.87 7381. 92 7450.27 7519.82 7588.70 7658.60 7728.26 7799.07 7870.41 7939.29 8007.28 8077.83 8147.99 8219.53 8289.42 8362.58 8436.45 8509.70 2310.17 2362.10 2412.96 2466.84 2520.58 2576.36 2632.26 2689.66 2746.77 2805.45 2865.36 2924.72 2984.85 3047.85 3110.99 3175.14 3238.66 3302.15 3364.46 3427.24 3489.69 3550.36 3611.03 3673.98 3735.77 3797.65 3857.77 3918.89 3977.15 4031.43 4429.83 4507.06 4583.29 4662.28 4738.14 4814.39 4888.83 4963.03 5033.48 5101.82 5168.10 5230.36 5289.47 5347.63 5403.37 5458.41 5511.50 5563.22 5613 .59 5664.40 5714.61 5763.35 5812.79 5864.77 5915.87 5966.96 6016.78 6066.85 6112.64 6152.81 2925.95 2954.16 2982.81 3010.16 3032.56 3051.60 3067.39 3079.82 3086.53 3086.61 3080.82 3069.39 3051.13 3025.66 2995.86 2962.91 2927.93 2890.68 2853.47 2816.09 2778.36 2741.61 2706.06 2670.32 2635.35 2600.20 2566.37 2531.00 2494.02 2455.37 5308.91 5388.93 5468.43 5549.58 5625.51 5700.05 5771.45 5840.97 5904.46 5962.86 6016.70 6064.47 6106.38 6144.24 6178.32 6210.72 6240.95 6269.40 6297.19 6325.80 6354.21 6382.21 6411.81 6444.08 6476.31 6508.89 6541. 25 6573.63 6601.86 6624.64 33.45 33.24 33.06 32.85 32.62 32.37 32.11 31.82 31. 52 31.17 30.80 30.41 29.98 29.50 29.01 28.49 27.98 27.46 26.94 26.43 25.93 25.44 24.96 24.48 24.01 23.55 23.10 22.65 22.20 21.76 DLS (deg/ 100f) 5.56 1. 67 0.73 2.92 3.72 2.54 2.66 2.50 6.54 4.07 4.11 5.88 5.14 4.45 2.71 1. 36 2.21 1. 41 0.34 0.37 0.78 0.96 1. 29 0.47 0.81 0.36 0.39 2.44 3.35 3.77 Srvy Tool tool Corr type (deg) MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS ------ ------ ------ ------ None None None None None None None None None None . None None None None None None None None None None None. None None None None None None None None None SCHLUMBERGER Survey Report -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- Seq Measured # depth (ft) Incl angle (deg) Azimuth angle (deg) Course length (ft) TVD depth (ft) Vertical section (ft) Displ +N/S- (ft) Displ +E/W- (ft) Total displ (ft) At Azim (deg) -------- ------ ------- ------ -------- -------- ---------------- --------------- -------- ------ ------- ------ -------- -------- ---------------- --------------- 151 152 153 154 155 12223.70 12316.52 12408.73 12502.71 12565.14 156 157 158 159 160 12596.91 12689.72 12783.83 12878.29 12971.38 161 162 163 164 165 13065.60 13159.87 13254.87 13350.99 13446.69 166 167 168 169 170 13476.41 13616.42 13711.68 13806.97 13901.31 171 172 173 174 13996.58 14092.12 14140.74 14189.00 34.39 34.23 34.61 35.50 35.24 35.17 35.09 36.46 38.49 41.66 43.64 44.92 43.05 43.39 43.66 43.84 45.33 45.44 46.13 46.61 46.95 46.69 46.82 46.82 308.14 303.74 301.90 301.75 301. 52 301.90 299.00 293.65 288.35 282.16 277.49 277.40 276.71 274.95 273.50 273.13 271.98 272.49 272.46 272.97 274.06 274.62 274.57 274.57 [(c)2005 IDEAL ID8_1C_02] 94.02 92.82 92.21 93.98 62.43 31.77 92.81 94.11 94.46 93.09 94.22 94.27 95.00 96.12 95.70 29.72 140.01 95.26 95.29 94.34 95.27 95.54 48.62 48.26 8586.23 8662.92 8738.98 8815.91 8866.82 8892.78 8968.69 9045.06 9120.04 9191.29 9260.61 9328.10 9396.45 9466.50 9535.89 9557.36 9657.07 9723.98 9790.43 9855.52 9920.77 9986.14 10019.45 10052.48 4083.22 4131.25 4177.92 4225.83 4257.86 4274.10 4320.89 4367.02 4412.08 4455.07 4496.54 4537.25 4577.70 4616.93 4654.71 4666.23 4720.19 4757.12 4794.55 4832.22 4871.32 4911.38 4931.87 4952.22 6188.50 6219.20 6247.44 6275.90 6294.86 6304.48 6331.54 6355.88 6376.40 6392.05 6402.89 6411.42 6419.53 6426.21 6431.06 6432.25 6436.62 6439.26 6442.21 6445.45 6449.71 6454.98 6457.81 6460.62 2414.07 2371.74 2327.94 2282.08 2251.31 2235.73 2189.70 2140.41 2086.78 2029.01 1966.14 1900.88 1835.41 1769.93 1704.21 1683.69 1585.51 1517.75 1449.52 1381.31 1312.02 1242.55 1207.25 1172.17 6642.69 6656.09 6667.07 6677.94 6685.33 6689.17 6699.50 6706.61 6709.19 6706.35 6697.96 6687.27 6676.75 6665.49 6653.03 6648.96 6629.02 6615.71 6603.27 6591.80 6581.80 6573.48 6569.69 6566.09 21.31 20.87 20.44 19.98 19.68 19.53 19.08 18.61 18.12 17.61 17.07 16.51 15.96 15.40 14.84 14.67 13.84 13.26 12.68 12.10 11. 50 10.90 10.59 10.28 DLS (deg/ 100f) 4.05 2.68 1. 20 0.95 0.47 0.72 1. 80 3.63 4.03 5.47 3.96 1. 36 2.03 1. 30 1. 08 1. 05 1. 21 0.40 0.72 0.64 0.91 0.51 0.28 0.00 Srvy Tool tool Corr type (deg) MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS MWD_IFR_MS Projection ------ ------ ------ ------ None None None None None None . None None None None None None None None None None None None None None None . None None to TD ',/':;:;""',' "1"'l'c;;J,, ' - j llY "1 " '''~ ' æ) Ui '=1""1 ? d q P 1- ~;! ! r . u l.:J "~n' 1-- ¡ , G ',! ~I j d j' L. J1q!r ¡U,q ~!,.; ,-; r I r' ,r¡:;'\ i JH,,' ! I' AI ¡;0,' LJ," ji~~ !¡~ .··/11·...· ''-''\ j,1 ¡wI "\ Uff,~ ~ ,j 1 J,r-:;.,' n,:¡ {' 1-3 L=:i LJ U I..-'V . ¿;(o{ -~41 . FRANK H. MURKOWSKI, GOVERNOR AI¡ASIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 April 13, 2005 Mr. Mark Weggeland Greater Pt. McIntyre Area Manager BP Exploration Alaska, Inc. P.O. Box 196612 Anchorage, AK 99619-6612 Re: Waiver of Gas-Oil Ratio Limitations for Niakuk well NK-38A Dear Mr. Weggeland: By letter dated April 12, 2005 you requested waiver of the requirements of 20 MC 25.240(a) which limits producing gas-oil ratio ("GOR") within an oil well to no more than twice the original solution GOR of the crude. Within a few days, the GOR of well NK-38A is anticipated to exceed these limits. NK-38A began production testing on March 30,2005. The well produces within the Ivishak formation within the Niakuk area. Pool rules have not been established for this formation. BPXA wishes to continue production until July 31, 2005 to gain information to help determine the optimum reservoir management program for the pool, including the feasibility of water injection. Based upon preliminary modeling work, BPXA does not expect negative impact to ultimate recovery as a result of production at higher GORs during the requested test period. 20 MC 25.240(b)(3) allows the Commission to waive the GOR limitation if acquisition of pool performance data is necessary to determine an optimum reservoir management program. Waiver of the GOR during the proposed test period will not promote waste of the resource and is needed to help determine an optimum development plan for the r se oir. Therefore, the Commission waives requirements of 20 MC 25.240( u . July 31, 2005. ~RPR.12.2005 8: 52RM . NO. 875 P.2/3 , . bp . o , ElP ExploratIon (Alaska) 1M. 900 East Ele~501') BOlllQl/ard P.O. Box 196612 AMhorage,Aleaka 99619·6612 (90715131-5111 April 12, 2005 Commissioners ...., Alaska Oil and Gas Conservation Commission 333 West ¡lh Avenue, Suite 100 Anchorage, AK 99501 Re: Waiver of Gas-Oil Ratio Limitations for the NK-38A Well Dear Commissioners: In accordance with 20 AAC 25.240(b)(3), BP Exploration (Alaska) Inc. (BPXA), operator of the Prudhoe Bay Unit (PBU)J applies to waive the Gas-Oil Ratio (GaR) limitations for the NK-38A Well in the Niákuk area. This waiver is needed to acquire the pool performance data required to determine an optimum reservoir management program. NK-38A Well production testing began March 30, 2005. Recent reservoir trends indicate that within a few days the NK-38A Well is expected to exceed the established GaR. BPXA wishes to continue production testing for this Ivishak well to obtain enough pool performance data to help determine an optimum reservoir management program. Therefore, effective immediately, we request a waiver on the GOR limitation for this well until July 31 , 2005. During the requested waiver period, BPXA will petiorm IÇlboratory shrInkage¡ tests to allow the well tests to be corrected and to establish initial tract GaR. We will also perform reservoir surveillance to determine completion efficiency. These data will be used to develop an optimum reservoir management program, including water injection feasibility. The NK-38A Well will be tested regularly during this timeframe to verify reservoir performance. Based upon our preliminary modeling work, we do not expect that continued well production at a higher GOR during the waiver period will affect ultimate recovery. Should you have any questions related to this request, don't hesitate to contact Gary Gustafson at 564-5304. Sincerely Yours, ~W Mark Weggeland GPMA Manager 1 RPR.12.2005 8: 53RM . , i .~ , .. Cc: Greg Threadgill, ExxonMobil Don Inee, ConocoPhillips Gary Forsthoff, Chevron Leonard Gurule, Forest Oil Gary Gustafson, BPXA Leslie Senden, BPXA Bob Gerikl BPXA . 2 NO.875 P.3/3 APR. 12.2005 8:52AM . NO. 875 P.V3 , . . bp BÞ Exploration (Alaska), Inc. P,O. Box 196612 900 east Banson Boulevard AnchoragB, AK 99519·6612 P.O. BOK 196612 ~~c 'Qo~ 4,0-91' '" ~~ &6:""," <> ~, Fax To: Jane Williamson, Commissioner, AOGCC From: Julia Rachford for Mark Weggeland Recipient Fax: 276·7542 Recipient Phone: 793·1228 Sender Pax: 564-4637 Sender Phone: 564-5797 Dllte: April 12, 2005 Pages: 2 (Not Including Cover Sheet) Re: Waiver of Gas-Oil Ratio Limitations for the NK~aA Well o Ufgent X For Review o Please Comment CI Plelllse Reply . Comments: .tt.Ik!ft** Please Deliver to Recipient (s) Immediately *****.tt Caution: This faŒimile may contain information whIch Is confidential and/pr protecl:et:l by the Attomey/O/er1t privilege and i5 Intended for reœipt and tJ5e solely by the in(iivid(JQI or entity named above. If you are not !f¡e inlEl7ded recipient, any dlsdosut'Ø¡ copying or l/S8 of this Information is prohibited. If yrJIJ have receIVed this fTansmis5ion In etrOIi please notify (JS by telephone immediately. Thank you. - ~ &\1TŒ lill~ . IF; rL1 ¡F[;:\ (~) 'U~~ u~ ~Lr\J ® \l / / J ! I , ¡ FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL A1Q) GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITË 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay NK-38A BP Exploration (Alaska) Inc. Permit No: 204-241 Surface Location: 1410' NSL, 853 WEL, SEC. 36, TI2N, RI5E, UM Bottomhole Location: 4777' NSL, 603' WEL, SEe. 25, TI2N, RI5E, UM DearMr. Isaacson: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. In accordance with 20 AAC 25.005(£), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name NK-38A PH and API number 50-029-22540-70 from records, data and logs acquired for well Prudhoe Bay NK-38A. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Daniel T. Seamount, Jr. Commissioner DATED this/ day of December, 2004 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. I STATE OF ALASKA . AlAt:¡ Oil AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 MC 25.005 v...JG/J, 1113o{à~ 1a. Type of work o Drill 181 Redrill r b. Current Well Class o Exploratory 181 Development Oil o Multiple Zone ORe-Entry o Stratigraphic Test o Service o Development Gas o Single Zone 2. Operator Name: 5. Bond: 181 Blanket o Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S 100302630-277 NK-38A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage. Alaska 99519-6612 MD 16842 TVD 9898 Prudhoe Bay Field / ~ 4a. Location of Well (Governmental Section): 7. Property Designation: ~;..IaI~f!,..;ed 1v:d..1:.. ~ Ii ff)e/' Surface: ADL 034630 ~,/ Ipt". /).? 'f 1410' NSL, 853' WEL, SEC. 36, T12N, R15E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud/Date: 2661' NSL, 69' WEL, SEC. 25, T12N, R15E, UM December 26, 2004 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4777' NSL, 603' WEL, SEC. 25, T12N, R15E, UM 2560 780 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: X-721706 y- 5979950 Zone- ASP4 (Height above GL): Plan 48 feet NK-19A is 2200' away 16. Deviated Wells: Kickoff Depth: 9200 feet 17. Maximum Anticipated Pressures in psig (see 20 MC 25.<95) Maximum Hole Angle: 90 deorees Downhole: 4975 Surface: 4000 18. Qa$ingi.prograni: Specifications ,.... " "QUåptltYOfa~~~R~t Size Top PI." '....'" .,., (c.f.or sa Hole Casina Weiaht Grade Coupling Length MD TVD MD TVD (includina staae data) 8-1/2" 7" 26# L-80 BTC-M 4362' 9200' 6526' 13562' 9607' 169 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 3430' 13412' 9492' 16842' 9898' 16 sx Class 'G' 19. PRESENT WELL CONDITIONSUMMARY (To be completedforRédriIIANDRè~øntry.()peré:ltions) Total Depth MD (ft): Total Depth TVD (ft): / Plugs (measured): / Effective Depth MD (ft): IEffective Depth TVD (ft): Junk (measured): 17475 10006 None 17392 9979 None ¡...;a$lt:)g L..~l1gth i·.$ize(··· ......>. V!oI'Y'!!""" MI;) /. ii TVD Structur;:¡1 Conductor 80' 20" 260 sx Arcticset (Approx.) 80' 80' Surface 4504' 13-3/8" 1418 sx PF 'E', 375 sx Class 'G' 4544' 4213' Intermediate 16023' 9-5/8" 352 sx Class 'G' 16060' 9460' Production Liner 1608' 7" 322 sx Class 'G' 15867' - 17475' 9370' - 10006' Perforation Depth MD (ft): 16102' - 17280' perfOration Depth TVD (ft): 9479' - 9942' 20. Attachments 181 Filing Fee, $100 o BOP Sketch 181 Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report 181 Drilling Fluid Program 181 20 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Phil Smith, 564-4897 Printed Name Bilt Isfacson I Title Senior Drilling Engineer I ·il.1. Date "/lJ / 0 'i Prepared By Name/Number: Signature .....c.-. Phone 5645521 Terrie Hubble, 564-4628 1.J$~Øðl~ , 'ii i i ,'i.·' " .., ./ , Permit To Drill I API Number: Permit APpro~1 /c, I See cover letter for Number: .2 n ¥ -.:z. '$1/ 50- 029-22540-01-00 Date: /1- I If) V other requirements Conditions of Approval: Samples Required DYes .8No Mud Log Requi(ed DYes ~No Hydrogen Sulfide Measures DYes J8No Directional Survey Required 18Yes DNo Other:T t' <; +- ßO PE fo 4000 f~" tLi ~ t>~ vto1.-te . fi..1' fJ Ii J ~J, p~-{ 70 Art£:.. 'L~ , 0 ~s (h.)(.i\j ¡So P E I s Original Signed By nO ¡ ."""' I ~, , !~ r APPROVED BY Date /2 ¡j 10(/ Approved Bv: DAN SEAMOUNT ! "'7 ,: î \, ~ THE COMMISSION . ..... Form 10-401 Revised 06/2004 Submit In Duplicate · . I Well Name: I NK-38A Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Horizontal Sidetrack Producer Surface Location: X = 721,706.5 Y = 5,979,949.8 Estimated 1410' FSL 854' FEL Sec. 36, T12N, R15E Umiat / Pilot Hole Target: X = 723,100.0 Y = 5,986,400.0 TVDss 9607' (PB 1) 2744' FNL 731' FWL Sec. 30, T12N, R16E Umiat Bottom Pilot Hole: X = 722,658.4 Y = 5,986,448.2 TVDss 10,129' (PB 1 ) 2682' FNL 291' FWL Sec. 30, T12N, R16E Umiat Target Location: X = 722,297.1 Y = 5,986,500.0 TVDss 9898' Ivishak horizontal 2619' FNL 69' FEL Sec. 25, T12N, R15E Umiat Bottom Hole Location: X = 721,700.0 Y = 5,988,600.0 TVDss 9898' / Ivishak horizontal 503' FNL 603' FEL Sec. 25, T12N, R15E Umiat 1 AFE Number: 1 NED5L0543 1 //) 1 Estimated Start Date: 11 ~6jÓ4 Pilot MD: 14,247' TVD: Horizontal 16,842' 1 Rig: I Nabors 9ES ( 1 Operating days to complete: 125.0 10,129' I GL: 119.5' 1 Œ[] 28.5' I I KBE: 148.0' 9,898' 1 Well Design (conventional, slim hole, etc.): 2-String Horizontal Sidetrack wI Pilot Hole r 1 Objective: 1 Lower Ivishak in Southern fault block, upper Ivishak in Northern fault block 1 Formation Markers - Pilot Hole Formation Tops (wp09) MD TVD TVDss Comments CM3 10,843 7568 7520 8.8 PPG EMW CMl 12,102 8493 8445 THRZ 12,788 9018 8970 TKNG 13,070 9233 9185 9.6 PPG EMW SAG RIVER 13,562 9607 9559 10.0 PPG EMW TSHU 13,660 9682 9634 10.0 PPG EMW TSAD 13,735 9739 9691 9.9 PPG EMW TZ2A2 14,017 9954 9906 9.8 PPG EMW TZ2Al 14,047 9977 9929 9.8 PPG EMW TKVK 14,147 10,053 10,005 TD 14,247 10,129 10,081 (Lisburne @ -10,123' TVDss) TD Criteria: Pilot hole TD will be ±1 00' MD below top Kavik to log the entirety of the Sadlerochit. TD of the subsequent horizontal section is based on achieving target depth and minimum footage north the main E-W runnina fault. TD may be called early with 500' northern fault block footaqe if drillinq conditions deteriorate. /o.q 10,1- NK-38A Permit to Drill Page 1 . Directional . KOP: 19200' MD Maximum Hole Angle: _640 in the 8-1/2" intermediate section (at KOP) -900 in the 6-1/8" horizontal section Close Approach Wells: All wells pass major risk criteria for the planned sidetrack and pilot hole. The closest well NK-05 at 288' ctr-ctr distance and 145' allowable deviation at 11,400' planned MD. Survey Program: MWD Standard + IIFR / Cassandra Nearest Property Line: 780' to the nearest lease line Nearest Well within Pool: NK-19A @ 2200' (closest well in reservoir section, excluding P&A wells) ram WtlFt Grade Conn Length Top Btm MDrrVD MDrrVD 8-1/2" 7" 26# L-80 BTC-M 4362' 9,200/6,526' 13,562'/9,607' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 3430' 13,412'/9,492' 16,842'/9,898" Tubin 4-1/2" 12.6# L-80 IBT-M -13,386' GL 13,412'/9,492' FloPro PV <10 8-1/2" Intermediate: Drilling: Open Hole: Cased Hole: Sample Catchers - None Dir/GRlRes None None 6-1/8" Pilot Hole: Sample Catchers - over entire section at 20' intervals Drilling: Dir/GRlRes/Neu Open Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers - over entire section at 50' intervals Drilling: Dir/G RIRes/Neu/ ABI Open Hole: None Cased Hole: None NK-38A Permit to Drill Page 2 . . 6 sacks Class G @ 15.8 ppg, .1 t3/sack 4.5" 12.6#, L-80 Production Liner Lead: None Tail: Based on 80' shoe track, 3280' of 4-1/2" X 6-1/8" open hole with 40% excess, 150' 4-1/2" X 7" Liner Lap, an ' of 7" X 4" DP excess. Tail TOC· ,41' D (Top of Liner) Total Cement Vol Tail 86 bbls, 483 ft3 21-1 acks Class G @ 15.8 ppg, /sack Well Control Well control equipment consisting of 5000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum antici ated BHP Maximum surface ressure Kick tolerance Planned BOP test pressure Production Interval Maximum antici ated BHP Maximum surface ressure Kick tolerance Planned BOP test pressure * DisDosal . No annular injection in this well. · Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. NK-38A Permit to Drill Page 3 . . Sidetrack and Complete Procedure Summary Scope Pre-Riq Work: 1. R/U slick-line. Drift the 4 W' tubing to at least 9,400' md to confirm clear to the required cut depth. 2. Fluid pack the well as necessary. RU coiled tubing and abandon the 7" liner perforations from PBTD to 500' above the top perf with 62 bbls of class G cement. Combo pressure test the casing to 4000 psi fl 30 minutes. 3. R/U E-line. RIH with chemical cutter and severe the 4 W' tubing in the center of the full joint of tubing at -9,400' md. 4. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Continue to circulate until clean seawater returns to surface. Freeze protect to -2,100' MD with diesel. 5. Bleed casing and annulus pressures to zero. 6. Cycle the tubing hanger LDS and test the 9 5/8" mandrel packoff to 5000 psi. 7. Set a BPV and test to 1000 psi from tubing annulus. Secure the well. Level the pad as necessary. J Riq Operations: 1. MI I RU Nabors rig 2ES 2. Circulate out diesel freeze protection and diS~.~.. well to seawater. Set BPVfTWC. I.{(' A- 3. Nipple down tree. Nipple up and test BOPE t . , i. Pull BPVfTWC. 4000 ifÇ.,f· '- "'" 4. R/U. Pull 4 W' tubing from the cut at -10,200' and above. 5. RIH w/8 W' gauge ring I junk basket to top of tubing stub. 6. RIH with HES EZSV and set bridge plug as required to avoid cutting casing collar and place top of whip stock at -9,200. POOH. RID E-line. . I ' I 7. Pressure-test the 9 5/8" casing to 4000psi for 30 minutes. Record test. T M. s lO - 4;0 l CLf) f /úVIi.- . 8. P/U and RIH with 95/8" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired, and set on bridge plug. Shear off of whip stock. 9. Displace the well to 9.6 ppg LSND based milling fluid. Completely displace the well prior to beginning ".-- milling operations. 10. Mill window in 9 5/8" casing at ± 9000' MD, plus approximately 20' beyond middle of window. Circulate well bore clean. 11. Pull up into 9 5/8" casing and conduct an FIT to 12.5 ppg EMW. POOH. 12. M/U 8 W' Dir/GR/Res assembly. RIH, kick off and drill the 8 1/2" intermediate section to the top of the /' Sag River, dropping to 40° inclination and increasing MW to 10.9 by the top of the HRZ at ±12,750' MD. Circulate well clean, short trip to window. POOH. 13. Run and cement a 7",26.0#, L-80 intermediate drilling liner. ,/ 14. Test the 9 5/8" casing X 7" liner to 4000psi for 30 minutes. Record the test. ,-- 15. M/U 6 1/8" Dir/GR/Res/Neu/Den assembly. RIH to the landing collar. 16. Drill out the 7" liner float equipment and cement to the shoe. 17. Displace the well to 10.2 ppg LSND drilling fluid plus drill -20' new formation; pull up into the shoe and conduct an FIT to 12.0 ppg EMW. 18. Drill through Ivishak formation to TD in the Kavik. POH, download LWD data. 19. RIH with~. -ended drillpipe to TD at ±14,247'. Abandon the 685' open hole section into the casing /' shoe wit 0 bls class G cement. 20. RIH wth 8" Dir/GR/Res/Neu/Den/ABI. Dress off the cement top to the 7" casing shoe and change the mud over to 10.2 ppg Flo-Pro. ,/ 21. Drill the build section with a tricone bit. 22. Trip for PDC bit and drill the horizontal section to planned TD, short trip as necessary. 23. Circulate, short trip, spot liner running pill, POOH. 24. Run and cement a 4 W', 12.6#, L-80 solid production liner. POOH UD all drill pipe. /' 25. RIH with 2 W' perf guns and perforate ±500'. /~ 26. R/U and run 41/2",12.6#, L-80 completion tubing. Land the tubing RILDS. 27. Set a TWC and test to 1000 psi 28. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. NK-38A Permit to Drill Page 4 . . 29. Reverse circulate inhibited 10.2 ppg brine to the packer depth. Set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 30. Shear the DCK valve and freeze protect the well to -2,100'. Secure the well. 31. Rig down and move off. Post-Ria Work: 1. Install well house and instrumentation. 2. MI / RU slick-line. Pull the ball and rod / RHC plug from landing nipple below the production packer. Install gas lift valves. 3. POP well to test unit until cleaned up. NK-38A Drilling Program Job 1: MIRU Hazards and Contingencies )¡-NK-38 is near the northeastern corner of the pad with NK-17 on 15' center on the pad entrance side and NK-18 on 15' center to ocean side. Both NK-17 and NK-18 will require shut-in and well house removal. The wells should be shut-in at the surface and the SSSV, and all surface flowlines and gas lift lines depressurized to header pressure. Remove wellhouses from the next two wells on either side also: NK-62 and NK-39. )¡- Niakuk is not designated as an H2S site. Recent H2S data from the pad is as follows: - Well Name H2S Reading Date #1 Closest SHL NK-17 none recorded #2 Closest SHL NK-18 20 ppm 6/8/02 #1 Closest BHL NK-62 40 ppm 8/6/01 #2 Closest BHL NK-39 none recorded The maximum on the pad is NK-14 at 45 ppm on 8/6/01. ~ Post Permit to Drill in the dog house and camp prior to spud Reference RP .:. "Drilling/Work-over Close Proximity Surface and Subsurface Wells Procedure" SOP Job 2: De-comDlete Well Hazards and Contingencies )¡- NORM test all retrieved well head and completion equipment. )¡- Verify the hanger type and connection. Be prepared with necessary equipment to remove. Reference RP .:. "De-completions" RP Job 4: Window Mill Hazards and Contingencies )¡- Once milling is complete, make sure all BOP equipment is operable. Wash out BOP stack to remove any metal cuttings, which may have settled there. NK-38A Permit to Drill Page 5 . . ~ The 9 5/8" casing was cemented with 72 bbls of class G at 15.8 ppg, or -1200 of gauge hole annular capacity. Expect no cement at the window depth. Reference RP .:. "Whipstock Sidetracks" RP .:. "Leak Off and Formation Integrity Tests" SOP Job 5: Drill 8-1/2" Intermediate Hole Hazards and Contingencies ~ The intermediate section will kick off in the Ugnu formation and TD at the top of Sag River. There are no fault crossings in the intermediate section. Lost circulation is not anticipated. Follow the lost circulation decision tree should LC become problematic. As planned, the well bore will drill over an east/west-trending fault. This fault is well below the planned well path and risks of cutting this fault are extremely low. ~ Cuttings gas and gas cut mud has been encountered within the West Sak interval at Niakuk. This interval does not contain substantial amounts of hydrocarbons and will not require cement isolation. The most recent Niakuk drilling history has shown this interval to be drilled with mud weights ranging from 9.1 to 9.3 ppg without any problems, nevertheless monitor for any signs of overpressure. ~ The NK-38A well path will drill full sections of the Tuffs, HRl, and Kingak shales, and each of these formations have been troublesome in the Niakuk area. The Tuffs is typically slow and erratic drilling, which can wipe out a PDC bit if proper drilling parameters are not maintained. The HRl and Kingak on the other hand, have shown severe hole instability problems. Follow all shale drilling practices to limit high ECD's, and maintain proper mud weights and shale stabilizers in the drilling fluid. NK-38A will start at 64° inclination and drop to 40° prior to reaching the HRl. 10.9 ppg mud weight will be adequate to maintain wellbore stability though the Kingak shale to interval TD. Follow all shale drilling practices to minimize potential problems. ~ No Kuparuk is expected. However, there may be a thin (-20) Kuparuk interval present above the Kingak that is below seismic resolution. The Kuparuk is expected to be oil bearing, if present. The Kingak top will be deeper to allow for the possible Kuparuk thickness. All other prognosed tops will remain the same. ~ KICK TOLERANCE: In the worst-case scenario of 10.5 ppg pore pressure at the Sag River depth, a fracture gradi~. f 12.5 ppg at the 9-5/8" casing window, and 10.5 ppg mud in the hole, the kick tolerance is .e'DbIS. Reference RP .:. "Shale Drilling, Kingak and HRl" RP .:. "Prudhoe Bay Directional Guidelines" .:. "Lubricants for Torque and Drag Management" RP .:. Niakuk Peer Assist Document Job 6: Install 7" Intermediate Liner Hazards and Contingencies ~ Avoid high surge pressures with controlled running speeds and by breaking circulation slowly. High surge pressures could lead to losses to the Sag River or exacerbate Kingak instability problems. NK-38A Permit to Drill Page 6 . . ~ Ensure the liner top packer is set prior to POOH. This may require going through the setting process twice. Slack off with rotation to the maximum allowable down weight, as per Baker representative. Reference RP .:. "Intermediate Casing Cementing Guidelines" RP .:. "Running and Cementing a Drilling Liner" RP Job 7: Drill 6-1/8" Pilot and Production Hole Hazards and Contingencies ~ The pilot hole is planned to drill into the Kavik far enough to see TKVK on LWD. Avoid drilling into the Lisburne formation. Prognosed TD is at -10,081 TVDss, leaving -42' TVD of undrilled Kavik. ~ The target and polygon for the horizontal section may change based on the results of the LWD. ~ Three faults are prognosed for the horizontal section: · Fault #1 dies upward and may not be present in the Upper Ivishak where the wellbore is located. · Fault # 2 is the critical fault. Cross this fault and enter the north fault block between the TZ2A1and TKVK interval. Err to the high side when crossing this fault to avoid drilling into the Kavik formation. Use logs/cuttings and geo-steer to remain in zone. There is a small possibility that the polygon may have to be enlarged to accommodate unexpected dip variations. . Fault #3 should not be penetrated if the location is correct However, the location uncertainty (250') exceeds the distance from the well TD to the expected fault location (150'). We could encounter this fault up to 100' md before the proposed TD. Look for Kingak, Sag or Shublik within 200' of TD. Stop drilling at fault. If lost circulation problems are experienced while crossing fault #2, then approach fault #3 conservatively. ~ TD will be picked by the wellsite geologist in collaboration with the town Geologist. TD well sooner if northern fault is encountered early, as evident by Kingak, Sag or Shublik. TD may be called earlier if drilling conditions are poor and at least 500' of the north fault block is drilled. ~ KICK TOLERANCE: In the worst-case scenario of 8.3 ppg pore pressure in the Ivishak, a fracture gradli~. rf ,9.5 ppg at the 7" casing shoe, and 8.5 ppg mud in the hole, the kick tolerance is I~ Reference RP .:. "Standard Operating Procedure: Leak-off and Formation Integrity Tests" .:. "Prudhoe Bay Directional Guidelines" .:. "Lubricants for Torque and Drag Management" RP Job 9: Install 4-1/2" Solid Production Liner Hazards and Contingencies ~ Reduce losses as much as feasible prior to cement job and pump excess cement as per loss rate. Evaluate alternative cement options based upon conditions. Hydraulic set packer may be required if losses exist prior to running liner. NK-38A Permit to Drill Page 7 . . Þ- Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable down weight, as per Baker representative. ~ Sufficient 4-1/2" liner will need to be run to extend -150' back up into the 7" intermediate liner. ~ Condition mud after casing is on bottom prior to pumping cement. A quality cement job is required for zonal isolation. Reference RPs .:. "Production Liner/Casing and Cementing Guidelines" .:. Schlumberger Cement Program Job 10: DPC Perforate Production Casina Hazards and Contingencies Þ- Observe Schlumberger's safety procedures while running in and out of hole with perf guns. Confirm all parties understand their responsibilities during pre-job safety meetings. Reference RPs .:. Follow Sch/umberger perforating practices and recommendations. .:. "DPC Perforating" RP Job 12: Run Completion Hazards and Contingencies Þ- Diesel will be used to freeze protect the well. The diesel flash point is 100° F. Diesel vapor pressure is - 0.1 psia at 100° F. Reference RP .:. "Completion Design and Running" RP .:. "Tubing connections" RP Job 13: ND/NUlRelease Ria Hazards and Contingencies Þ- No wells will require well house removal or shut-in for the rig move off of NK-38A. See MIRU section for nearest well. Þ- See Job 1 for adjacent well spacing. These are close well centers. Identify hazards in a pre move meeting, and take every precaution to ensure good communication prior to beginning the rig move. Use spotters when moving the rig. Reference RP .:. "Freeze Protecting an Inner Annulus" RP NK-38A Permit to Drill Page 8 TREE =, 4-1/16" CrN . . I I WELLHEAD - 13-5/8" FMC NK-38 SAFETY NOTES: ACTUATOR = BAKER f----.~~. KB. ELEV = 54.84' -~,..---~~-_.._,~.- BF. ELEV = 20' KOP= 2315' Max Angle = 67 @ 7715' · I 2149' -1 4-1/2" HES X NIP, 10 = 3.813" I Datum MD = 15643' Datum ìV D = 9200' SS I 13-3/8" CSG, 68/72#, NT-80, 10 = 12.347" I 4544' µ ~ GAS LIFT MANDRELS ST MD ìVD DEV TYPE VLV LATCH PORT DATE L 1 6312 5306 66 MERLA TPD RA · I 15845' -1 4-1/2" HES X NIP, 10 = 3.813" I Minimum ID = 3.725" @ 15891' ::8: ........., I 15856' 9-5/8" x 4-112" TrN HB-BPT 0<:..::::. I 4-1/2" HES XN NIPPLE PERM PKR, ID = 3.916" · I 15881' -1 4-1/2" HES X NIP, ID = 3.813" I I I 15891' -1 4-1/2" HES XN NIP, ID = 3.725" I I I TOP OF 7" LNR I 15867' I- 1 I 15867' 9-5/8" x 7" BAKER H PKR 1 ~ & HMC LNR HGR )( I 4-112" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" I 15904' I 15904' -1 4-112" TUBING TAIL WLEG I I 15884' H ELMO TT LOGGED 08/15/95 I I 9-5/8" CSG, 47#, NT-80S, ID = 8.681" I 16060' 1----4 ~ PERFORATION SUMMARY ~ REF LOG: SBT ON 02/25/95 16383' H MARKER JOINT I ANGLEAT TOP PERF: 63 @ 16102' ~ Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 4-1/2" 5 16102 - 16278 0 02/26/95 ~ 4-1/2" 5 16450 - 16725 0 02/26/95 4-1/2" 5 16870 - 16990 0 02/26/95 4-1/2" 5 17040 - 17280 0 02/26/95 ~ I PBTD I 17392' I 7" LNR, 29#, NT-80S, 0.0371 bpf, ID = 6.184" I 17475' DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNIT 03/01/95 ORlG COMPLETION, (POOL 7) WELL: NK-38 01/22/01 SIS-lsl CONVERTED TO CANVAS PERMIT No: 1941700 02/27/01 SIS-LG FINAL API No: 50-029-22540-00 09/28/01 RNITP CORRECTIONS SEC 36, T12N, R15E, 2268.66' FEL & 911.26' FNL 06/27/03 BG/KAK MD & SS DEPTH CORRECTIONS BP Exploration (Alaska) 4-1/16" erN 13-5/8" FMC BAKER 54.84' 20' 2315' rt<-38A propose~ /1 SAFETY NOTES TREE = . WELLHEAD = ÄCTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum lVD = 9200'SS 13-3/8" CSG, 68/72#, NT-80 H 4544' Minimum IC = 3.725" @ 4-1/2" HES XN NIPPLE PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 4-1/2" 5 16102 - 16278 S 4-1/2" 5 16450-16725 S 4-1/2" 5 16870 - 16990 S 4-1/2" 5 17040 - 17280 S 41/2" Chemical Cut q {j)o' -I -10,200' I Top cement abandonment Plug 15,600' I TOP OF 7" LNR 4-1/2" TBG, 12.6#, L-80 3.958" IDH 15904' 9-5/8" CSG, 47#, NT-80S H 16060' 7" LNR, 29#, NT-80S, 6.184" 10 I 17475' DATE 03/01/95 10/20/04 REV BY COMMENTS ORIG COMPLETION, (POOL 7) PGS PROPOSED SIDETRACK DATE REV BY 2100' -I 4-1/2" HES SSSV, ID = 3.813" I GAS LIFT MANDRELS EL:EU TYÆ EEÏJ DATE I 9050' H 9 5/8" X 7" Liner HGR / PKR 9,200' H 95/8" Window , I I I I I I I I I I , , 141/2" 12.6# L-80 Liner PBTD H 16,760' 141/2" 12.6# (3.958" ID) 0.0152 bpf H 16,842' I I , , , , , , , \ \ \ \ / , I I , \ . , , , \ - - - ... 1 14,247' -INK-38A PB1 Pilot Hole COMMENTS NIA KUK UNIT WELL: NK-38A PERMIT No: 1941700 API No: 50-029-22540-01 SEe 36, T12N, R15E, 2268.66' FEL & 911.26' FNL BP Exploration (Alaska) SURVEY PROGRAM Plan: NK~38A PEJ wp09 (NK-38!Plan NK·38A PBl Depth Fm Depth To Suney/PI¡¡n Tool Created By: Troy Jakabosky Date: II/JO/20! 9200J>O I Pla...med: NK-38A PSI wp{1<)V:M 1\·1WD+IFR·;.-MS Checked Date ------...-,~ Reviewed Dale WELL DETAILS Name "'"N/-8 Northing [iasting Latih-,de Longii1.1de Slot ¡ 7113.16 5979949.87 721706.47 TARGET DETAILS TVD +N/·S +E/·W Northing Basting Shape 607.00 6406.38 1583.84 5986400.02 723100.04 Point ........ SECTION DETAILS TVD +N/·S +E/-W DLeg TFace VSec Target NK.38A PEl T! -~._-- -,-"'~~.- TARGET DETAILS Name TVD +N/·S +E/·W Shape NK-38A PEl 9607.00 6406.38 1583.84 Point COMPANY DETATLS BJ'Amoco CASING DETAILS No. TVD MD Name Size " ~ o o ó3 P- " c:¡ ~ " > ~ I-< "E " ~ -£ " " '" COMPANY DETAlLS SURVEY PROGR/\.M REFERENCE INFORMATION BPAmoco T!1WNorth Depth I'm Depth To Survey/Plan 9200.00 Planned: NK-}8A pBi \>-p09 V36 roo! Date Plan: NK~3gA PBl \vpû9(NK-38/Plall NK~38A PEl) Created By: Tröy Jakabö!iky Date: ! 1/10/2004 M\VD~IFR~MS Checked Name NÙ11hing Latitude Sl01 NK<)b ·1512.29 7113,16 5979949.87 721706.47 70020'50.972N 14ïn2'ûO.l33W CASJNG DETAJLS FORMATION TOP DETAILS TVD MD Name Size No. TVDPath MDPath Formation 9607.00 13561.65 7" 7.000 1 7568.00 CM3 2 8493.00 CM] 3 9018.00 HRZ 4 9233.00 TKNO* 5 9607.00 TSOR 6 9682.00 TSHU 7 9739.00 TSAD 8 9954.00 TZ2A2 9 9977.00 TZ2Al 10 10053.00 TKVK 700 " 42 g ê, 6000 400 Name See lne 7 8 TARGET DETAILs TVD +N/-S Basting S!)ape Point p"lygon +B/-W Northing DLeg TFace VSce Target NK-38A PBl T1 . . BP BP Planning Report Field: Niakuk North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre WMM 2000 Site: NK Main Pad TR-12-15 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5981257.79 ft 714553.26 ft Latitude: 70 21 Longitude: 148 15 North Reference: Grid Convergence: 5.879 N 27.984 W True 1.64 deg Well: NK-38 Slot Name: 38 NK-38 Well Position: +N/-S -1512.29 ft Northing: 5979949.87 ft Latitude: 70 20 50.972 N +E/-W 7113.16 ft Easting : 721706.47 ft Longitude: 148 12 0.133 W Position Uncertainty: 0.00 ft Casing Points 10843.18 7568.00 CM3 0.00 0.00 12102.15 8493.00 CM1 0.00 0.00 12788.31 9018.00 HRZ 0.00 0.00 13070.60 9233.00 TKNG* 0.00 0.00 13561.65 9607.00 TSGR 0.00 0.00 13660.13 9682.00 TSHU 0.00 0.00 13734.97 9739.00 TSAD 0.00 0.00 14017.26 9954.00 TZ2A2 0.00 0.00 14047.46 9977.00 TZ2A 1 0.00 0.00 14147.24 10053.00 TKVK 0.00 0.00 NK-38A PB1 T1 9607.00 6406.38 1583.84 5986400.02 723100.04 70 21 53.977 N 148 11 13.813 W -Plan hit target NK-38A poly 9898.00 6588.87 488.71 5986550.02 722000.04 70 21 55.773 N 148 11 45.840 W -Polygon 1 9898.00 6699.53 1634.66 5986694.52 723142.16 70 21 56.860 N 148 11 12.325 W -Polygon 2 9898.00 6861.05 1213.99 5986843.52 722716.92 70 21 58.449 N 148 11 24.627 W -Polygon 3 9898.00 7321.85 484.45 5987282.52 721974.10 70 22 2.982 N 148 11 45.963 W -Polygon 4 9898.00 8758.29 526.96 5988719.52 721974.10 70 22 17.109 N 148 11 44.717 W -Polygon 5 9898.00 8773.18 23.72 5988719.52 721470.66 70 22 17.256 N 148 11 59.439 W -Polygon 6 9898.00 6532.79 -33.39 5986478.52 721479.85 70 21 55.222 N 148 12 1.110 W -Polygon 7 9898.00 6368.73 878.58 5986341.52 722396.23 70 21 53.608 N 148 11 34.439 W -Polygon 8 9898.00 6389.47 1631.67 5986384.52 723148.35 70 21 53.810 N 148 11 12.414W -Polygon 9 9898.00 6538.09 1798.84 5986538.02 723311.04 70 21 55.272 N 148 11 7.524 W -Polygon 10 9898.00 6624.15 1798.26 5986624.02 723307.92 70 21 56.118 N 148 11 7.540 W -Polygon 11 9898.00 6699.53 1634.66 5986694.52 723142.16 70 21 56.860 N 148 11 12.325 W -Plan out by 862.76 at 9898.00 6440.49 1338.61 5986426.86 722853.92 70 21 54.313 N 148 11 20.985 W . . BP BP Planning Report 9200.00 64.16 38.03 6525.88 4270.47 2847.90 0.00 0.00 0.00 0.00 9283.50 64.50 34.34 6562.06 4331.21 2892.31 4.00 0.40 -4.42 -85.00 10738.91 42.72 324.44 7491.39 5365.68 2983.71 4.00 -1.50 -4.80 -131.46 12129.44 42.72 324.44 8513.05 6133.02 2435.09 0.00 0.00 0.00 0.00 12710.48 40.00 280.00 8958.64 6330.00 2130.00 5.00 -0.47 -7.65 -112.07 12745.46 40.39 277.92 8985.36 6333.51 2107.70 4.00 1.12 -5.95 -74.53 13561.65 40.39 277.92 9607.00 6406.38 1583.84 0.00 0.00 0.00 0.00 NK-38A PB1 T1 14247.24 40.39 277.92 10129.17 6467.59 1143.81 0.00 0.00 0.00 0.00 Survey 9200.00 64.16 38.03 6525.88 6477.88 4270.47 2847.90 0.00 5984302.53 724426.67 Start Dir 4/1 00 9283.50 64.50 34.34 6562.06 6514.06 4331.21 2892.31 4.00 5984364.55 724469.27 MWD+IFR+MS 9300.00 64.06 33.79 6569.22 6521.22 4343.52 2900.64 4.00 5984377.10 724477.22 MWD+IFR+MS 9400.00 61.47 30.36 6614.99 6566.99 4418.82 2947.87 4.00 5984453.76 724522.21 MWD+IFR+MS 9500.00 58.96 26.77 6664.68 6616.68 4495.00 2989.39 4.00 5984531.14 724561.45 MWD+IFR+MS 9600.00 56.56 22.99 6718.03 6670.03 4571.70 3025.00 4.00 5984608.84 724594.77 MWD+IFR+MS 9700.00 54.28 18.99 6774.79 6726.79 4648.52 3054.52 4.00 5984686.51 724622.00 MWD+IFR+MS 9800.00 52.14 14.77 6834.69 6788.69 4725.11 3077.80 4.00 5984763.75 724643.02 MWD+IFR+MS 9900.00 50.16 10.31 6897.43 6849.43 4801.09 3094.75 4.00 5984840.19 724657.70 MWD+IFR+MS 10000.00 48.37 5.59 6962.70 6914.70 4876.09 3105.27 4.00 5984915.46 724666.00 MWD+IFR+MS 10100.00 46.77 0.62 7030.19 6982.19 4949.74 3109.31 4.00 5984989.20 724667.86 MWD+IFR+MS 10200.00 45.40 355.40 7099.58 7051.58 5021.68 3106.85 4.00 5985061.03 724663.27 MWD+IFR+MS 10300.00 44.28 349.96 7170.51 7122.51 5091.57 3097.90 4.00 5985130.62 724652.27 MWD+IFR+MS 10400.00 43.43 344.31 7242.65 7194.65 5159.06 3082.52 4.00 5985197.63 724634.89 MWD+IFR+MS 10500.00 42.86 338.52 7315.65 7267.65 5223.83 3060.77 4.00 5985261.72 724611.23 MWD+IFR+MS 10600.00 42.59 332.64 7389.14 7341.14 5285.55 3032.75 4.00 5985322.58 724581.41 MWD+IFR+MS 10700.00 42.62 326.73 7462.77 7414.77 5343.93 2998.61 4.00 5985379.93 724545.56 MWD+IFR+MS 10738.91 42.72 324.44 7491.39 7443.39 5365.68 2983.71 4.00 5985401.23 724530.02 End Dir : 1073 10800.00 42.72 324.44 7536.27 7488.27 5399.39 2959.61 0.00 5985434.21 724504.93 MWD+IFR+MS 10843.18 42.72 324.44 7568.00 7520.00 5423.23 2942.57 0.00 5985457.52 724487.19 CM3 10900.00 42.72 324.44 7609.74 7561.74 5454.58 2920.15 0.00 5985488.20 724463.86 MWD+IFR+MS 11000.00 42.72 324.44 7683.22 7635.22 5509.76 2880.70 0.00 5985542.19 724422.79 MWD+IFR+MS 11100.00 42.72 324.44 7756.69 7708.69 5564.94 2841.24 0.00 5985596.18 724381.73 MWD+IFR+MS 11200.00 42.72 324.44 7830.16 7782.16 5620.13 2801.79 0.00 5985650.17 724340.66 MWD+IFR+MS 11300.00 42.72 324.44 7903.64 7855.64 5675.31 2762.34 0.00 5985704.15 724299.59 MWD+IFR+MS 11400.00 42.72 324.44 7977.11 7929.11 5730.49 2722.88 0.00 5985758.14 724258.53 MWD+IFR+MS 11500.00 42.72 324.44 8050.58 8002.58 5785.67 2683.43 0.00 5985812.13 724217.46 MWD+IFR+MS 11600.00 42.72 324.44 8124.05 8076.05 5840.86 2643.98 0.00 5985866.12 724176.39 MWD+IFR+MS 11700.00 42.72 324.44 8197.53 8149.53 5896.04 2604.52 0.00 5985920.11 724135.32 MWD+IFR+MS 11800.00 42.72 324.44 8271.00 8223.00 5951.22 2565.07 0.00 5985974.10 724094.26 MWD+IFR+MS 11900.00 42.72 324.44 8344.47 8296.47 6006.40 2525.61 0.00 5986028.09 724053.19 MWD+IFR+MS 12000.00 42.72 324.44 8417.95 8369.95 6061.59 2486.16 0.00 5986082.08 724012.12 MWD+IFR+MS 12100.00 42.72 324.44 8491.42 8443.42 6116.77 2446.71 0.00 5986136.07 723971.06 MWD+IFR+MS 12102.15 42.72 324.44 8493.00 8445.00 6117.96 2445.86 0.00 5986137.23 723970.17 CM1 12129.44 42.72 324.44 8513.05 8465.05 6133.02 2435.09 0.00 5986151.96 723958.97 Start Dir 5/100 12200.00 41.49 319.50 8565.41 8517.41 6170.27 2405.98 5.00 5986188.34 723928.77 MWD+IFR+MS 12300.00 40.15 312.13 8641.13 8593.13 6217.11 2360.53 5.00 5986233.81 723881.95 MWD+IFR+MS 12400.00 39.29 304.42 8718.10 8670.10 6256.66 2310.47 5.00 5986271.86 723830.75 MWD+IFR+MS 12500.00 38.96 296.51 8795.73 8747.73 6288.61 2256.19 5.00 5986302.18 723775.54 MWD+IFR+MS 12600.00 39.16 288.57 8873.43 8825.43 6312.71 2198.09 5.00 5986324.56 723716.76 MWD+IFR+MS 12700.00 39.89 280.80 8950.61 8902.61 6328.78 2136.62 5.00 5986338.81 723654.85 MWD+IFR+MS 12710.48 40.00 280.00 8958.64 8910.64 6330.00 2130.00 5.00 5986339.83 723648.19 Start Dir 4/100 . . BP BP Planning Report 12745.46 40.39 277.92 8985.36 8937.36 6333.51 2107.70 4.00 5986342.68 723625.81 End Dir : 1274 12788.31 40.39 277.92 9018.00 8970.00 6337.34 2080.20 0.00 5986345.69 723598.20 HRZ 12800.00 40.39 277.92 9026.90 8978.90 6338.38 2072.70 0.00 5986346.51 723590.67 MWD+IFR+MS 12900.00 40.39 277.92 9103.07 9055.07 6347.31 2008.51 0.00 5986353.53 723526.25 MWD+IFR+MS 13000.00 40.39 277.92 9179.23 9131.23 6356.24 1944.33 0.00 5986360.56 723461.84 MWD+IFR+MS 13070.60 40.39 277.92 9233.00 9185.00 6362.54 1899.02 0.00 5986365.52 723416.36 TKNG* 13100.00 40.39 277.92 9255.39 9207.39 6365.17 1880.15 0.00 5986367.58 723397.42 MWD+IFR+MS 13200.00 40.39 277.92 9331.55 9283.55 6374.09 1815.96 0.00 5986374.61 723333.01 MWD+IFR+MS 13300.00 40.39 277.92 9407.72 9359.72 6383.02 1751.78 0.00 5986381.63 723268.59 MWD+IFR+MS 13400.00 40.39 277.92 9483.88 9435.88 6391.95 1687.60 0.00 5986388.66 723204.17 MWD+IFR+MS 13500.00 40.39 277.92 9560.04 9512.04 6400.88 1623.41 0.00 5986395.68 723139.76 MWD+IFR+MS 13561.65 40.39 277.92 9607.00 9559.00 6406.38 1583.84 0.00 5986400.02 723100.04 NK-38A PB1 T1 13600.00 40.39 277.92 9636.21 9588.21 6409.81 1559.23 0.00 5986402.71 723075.34 MWD+IFR+MS 13660.13 40.39 277.92 9682.00 9634.00 6415.17 1520.64 0.00 5986406.93 723036.61 TSHU 13700.00 40.39 277.92 9712.37 9664.37 6418.73 1495.05 0.00 5986409.73 723010.92 MWD+IFR+MS 13734.97 40.39 277.92 9739.00 9691.00 6421.86 1472.60 0.00 5986412.19 722988.40 TSAD 13800.00 40.39 277.92 9788.53 9740.53 6427.66 1430.86 0.00 5986416.76 722946.51 MWD+IFR+MS 13900.00 40.39 277.92 9864.69 9816.69 6436.59 1366.68 0.00 5986423.78 722882.09 MWD+IFR+MS 13943.73 40.39 277.92 9898.00 9850.00 6440.49 1338.61 0.00 5986426.86 722853.92 NK-38A poly 14000.00 40.39 277.92 9940.86 9892.86 6445.52 1302.50 0.00 5986430.81 722817.67 MWD+IFR+MS 14017.26 40.39 277.92 9954.00 9906.00 6447.06 1291.42 0.00 5986432.02 722806.56 TZ2A2 14047.46 40.39 277.92 9977.00 9929.00 6449.75 1272.04 0.00 5986434.14 722787.10 TZ2A 1 14100.00 40.39 277.92 10017.02 9969.02 6454.45 1238.31 0.00 5986437.83 722753.26 MWD+IFR+MS 14147.24 40.39 277.92 10053.00 10005.00 6458.66 1207.99 0.00 5986441.15 722722.82 TKVK 14200.00 40.39 277.92 10093.18 10045.18 6463.37 1174.13 0.00 5986444.86 722688.84 MWD+IFR+MS 14247.00 40.39 277.92 10128.98 10080.98 6467.57 1143.96 0.00 5986448.16 722658.56 Total Depth: 1 14247.24 40.39 277.92 10129.17 10081.17 6467.59 1143.81 0.00 5986448.18 722658.41 MWD+IFR+MS SURVEY PROGRAM Plan: NK~38A WPJO (NK-38/Plan NK·38A) lÀ'Pth Fm Depth To S1J.fveyœ!alî rooi Created By: Troy Jakabosky Dat 62-1)0 )6841,80 P!ill\1100: NK~3f>A WPW V1 Checked Dat Dat - SECTION DETAILS Target NK·38A T! NK-38A T2 NK·38A NK-38A T4 T5 COMPANY D[TAJLS REFERENCE INFORMA nON BPAnlOC{) TARGET DETAILS Name. TVD +NI-S Œ/-W Northing Easting Shape Name +E/-\V Northing Eastíng Latitude Longîtude Slot NK·38--15!2.29 7113.16 5979949.87 72 1706.47 7O+20·SO.972N !48+!2'ÜÜ.133W 38 ~._-,.~-~~ FORMA nON TOP DETAILS No. TVDPath MDPath Formation ~ "' :5 f2 '" 1õ. " Q -¡¡ " E " > " ¡: f-< VSec TFace DLeg TVD Azi íue MD Sec I 2 3 4 5 6 7 8 9 !O II !2 13 14 15 16 COMPANY·DETAILS REfERENCE JNFORMATJON SURVEY PROGRAM BP Amoco Depth Fm Depth To SUfl/cyIPlm:¡ 13562,ÛO 1684L80 Plmmed: NK-38A WPJO V1J2 1'001 Ditte: pj¡m: NK-3-8A WP!O (NK-38!Plan NK~38A) Cn..'atOO By: Troy Jakabosky Checked Date: I !/1O/2004 MWD+JfR+MS Name -'-EJ-W Northing NK-38 -1512.29 7113.¡6 5979949.&7 SEcnON DET AlLS See MD Ine Azi TVD +NI-S +EI-W DLeg TFace VSec Target 1 40.39 9607.26 0.00 0.00 2 44.39 9681.10 4.00 0.00 3 89.42 9896.24 8.00 0.40 4 89.42 9897.36 0.00 0.00 5 90.00 9898.00 7.00 86.28 NK-38A Tl 6 90.00 9898.00 7.00 90,00 7 90.00 9898.00 0.00 0.00 8 90,00 9898.00 8.00 90.00 NK-38A 1'2 9 90.00 9898,00 8.00 90.00 10 90.00 9898,00 0.00 0.00 11 90.00 9898.00 8,00 90.00 NK-38A T3 12 90,00 9898,00 8.00 90.00 13 90.00 9898,00 0.00 0.00 14 90,00 9898.00 4.00 -90.00 NK-38A T4 15 90.00 9898.00 4.00 9MO 16 90.00 9898.00 0.00 0.00 NK-38A T5 Latitude umgitude Slot 7Ü"2Û'50.972N ¡4W12'ÛO.l33W 3& TARGET DETAILS Name TVD +NI-S +EI-W Northing Easting Shape 11 9898.00 Point T2 9898.00 Point T4 9898.00 721700.04 Point 9898.00 8646.95 721700.05 Point 9893.00 7267.52 721699.45 Point 9893.00 722000.04 Polygon 9898.00 721400.04 Polygon PB1 Fanlt2 9898,00 721400.04 Polygon PB1 FaulG 9898.00 721400.05 Polygon :¡; '" '" S :;:- € o z 2: -" .;;¡ o U') West(-)IEast(+) [IOOOtllin] FORMA nON TOP OFT AiLS No. TVOPath MOPath Formation 1 2 CASING OET AILS No. TVO 9607.00 9898.00 MO Name Size 7" 41/2" 7.000 4.500 . . BP BP Planning Report Field: Niakuk North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: NK Main Pad TR-12-15 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre WMM 2000 5981257.79 ft 714553.26 ft Latitude: 70 21 Longitude: 148 15 North Reference: Grid Convergence: 5.879 N 27.984 W True 1.64 deg Well: NK-38 Slot Name: 38 NK-38 Well Position: +N/-S -1512.29 ft Northing: 5979949.87 ft Latitude: 70 20 50.972 N +EI-W 7113.16 ft Easting : 721706.47 ft Longitude: 148 12 0.133 W Position Uncertainty: 0.00 ft Casing Points 0.00 CM3 0.00 0.00 0.00 CM1 0.00 0.00 0.00 HRZ 0.00 0.00 0.00 TKNG* 0.00 0.00 0.00 TSGR 0.00 0.00 13663.26 9682.00 TSHU 0.00 0.00 13748.32 9739.00 TSAD 0.00 0.00 0.00 TZ2A2 0.00 0.00 0.00 TZ2A 1 0.00 0.00 0.00 TKVK 0.00 0.00 Targets NK-38A T1 9898.00 6530.02 784.15 5988499.94 722297.08 70 21 55.194 N 148 11 37.200 W NK-38A T2 9898.00 6688.82 488.75 5986649.92 721997.12 70 21 56.756 N 148 11 45.839 W NK-38A T4 9898.00 7497.40 215.46 5987450.03 721700.04 70 22 4.708 N 148 11 53.831 W NK-38A T5 9898.00 8646.95 249.49 5988600.03 721700.05 70 22 16.014 N 148 11 52.834 W NK-38A T3 9898.00 7267.52 208.06 5987220.04 721699.45 70 22 2.448 N 148 11 54.048 W NK-38A poly 9898.00 6588.87 488.71 5986550.02 722000.04 70 21 55.773 N 148 11 45.840 W -Polygon 1 9898.00 6699.53 1634.66 5986694.52 723142.16 70 21 56.860 N 148 11 12.325 W -Polygon 2 9898.00 6861.05 1213.99 5986843.52 722716.92 70 21 58.449 N 148 11 24.627 W -Polygon 3 9898.00 7321.85 484.45 5987282.52 721974.10 70 22 2.982 N 148 11 45.963 W -Polygon 4 9898.00 8758.29 526.96 5988719.52 721974.10 70 22 17.109 N 148 11 44.717 W -Polygon 5 9898.00 8773.18 23.72 5988719.52 721470.66 70 22 17.256 N 148 11 59.439 W . . BP BP Planning Report -Polygon 6 9898.00 6532.79 -33.39 5986478.52 721479.85 70 21 55.222 N 148 12 1.110W -Polygon 7 9898.00 6368.73 878.58 5986341.52 722396.23 70 21 53.608 N 148 11 34.439 W -Polygon 8 9898.00 6389.47 1631.67 5986384.52 723148.35 70 21 53.810 N 148 11 12.414 W -Polygon 9 9898.00 6538.09 1798.84 5986538.02 723311.04 70 21 55.272 N 148 11 7.524 W -Polygon 10 9898.00 6624.15 1798.26 5986624.02 723307.92 70 21 56.118 N 148 11 7.540 W -Polygon 11 9898.00 6699.53 1634.66 5986694.52 723142.16 70 21 56.860 N 148 11 12.325 W NK-38A PB1 Fault1 9898.00 6906.51 -102.18 5986850.03 721400.04 70 21 58.897 N 148 12 3.122 W -Polygon 1 9898.00 6906.51 -102.18 5986850.03 721400.04 70 21 58.897 N 148 12 3.122 W -Polygon 2 9898.00 6929.86 798.95 5986900.03 722300.04 70 21 59.126 N 148 11 36.766 W NK-38A PB1 Fault2 9898.00 7456.29 -85.91 5987400.03 721400.04 70 22 4.304 N 148 12 2.646 W -Polygon 1 9898.00 7429.67 813.74 5987400.03 722300.04 70 22 4.042 N 148 11 36.332 W -Polygon 2 9898.00 7456.29 -85.91 5987400.03 721400.04 70 22 4.304 N 148 12 2.646 W NK-38A PB1 Fault3 9898.00 8725.80 -48.33 5988670.03 721400.05 70 22 16.790 N 148 12 1.547 W -Polygon 1 9898.00 8725.80 -48.33 5988670.03 721400.05 70 22 16.790 N 148 12 1.547 W -Polygon 2 9898.00 8979.06 859.60 5988950.03 722300.05 70 22 19.280 N 148 11 34.985 W Plan Section Information 13562.00 40.39 277.92 9607.26 6406.41 1583.62 0.00 0.00 0.00 0.00 13662.00 44.39 277.92 9881.10 6415.70 1516.86 4.00 4.00 0.00 0.00 14224.90 89.42 278.20 9896.24 6486.66 1017.30 8.00 8.00 0.05 0.40 14336.38 89.42 278.20 9897.36 6502.57 906.97 0.00 0.00 0.00 0.00 14462.35 90.00 287.00 9898.00 6530.02 784.15 7.00 0.46 6.99 86.28 NK-38A T1 14645.65 90.00 299.83 9898.00 6602.71 616.30 7.00 0.00 7.00 90.00 14672.69 90.00 299.83 9898.00 6616.16 592.84 0.00 0.00 0.00 0.00 14799.80 90.00 310.00 9898.00 6688.82 488.75 8.00 0.00 8.00 90.00 NK-38A T2 15044.96 90.00 329.61 9898.00 6875.17 331.30 8.00 0.00 8.00 90.00 15094.30 90.00 329.61 9898.00 6917.74 306.34 0.00 0.00 0.00 0.00 15461.65 90.00 359.00 9898.00 7267.52 208.06 8.00 0.00 8.00 90.00 NK-38A T3 15517.59 90.00 3.48 9898.00 7323.44 209.27 8.00 0.00 8.00 90.00 15579.83 90.00 3.48 9898.00 7385.57 213.04 0.00 0.00 0.00 0.00 15691.72 90.00 359.00 9898.00 7497.40 215.46 4.00 0.00 -4.00 -90.00 NK-38A T4 15761.20 90.00 1.78 9898.00 7566.88 215.93 4.00 0.00 4.00 90.00 16841.80 90.00 1.78 9898.00 8646.95 249.49 0.00 0.00 0.00 0.00 NK-38A T5 Survey 13561.65 40.39 277.92 9607.00 9559.00 6406.38 1583.84 0.00 5986400.02 723100.04 7" 13562.00 40.39 277.92 9607.26 9559.26 6406.41 1583.62 0.00 5986400.04 723099.82 Start Dir 4/100 13600.00 41.91 277.92 9635.88 9587.88 6409.86 1558.85 4.00 5986402.75 723074.96 MWD+IFR+MS 13662.00 44.39 277.92 9681.10 9633.10 6415.70 1516.86 4.00 5986407.35 723032.81 Start Dir 8/100 13663.26 44.49 277.92 9682.00 9634.00 6415.82 1515.99 8.00 5986407.44 723031.94 TSHU 13700.00 47.43 277.95 9707.54 9659.54 6419.47 1489.83 8.00 5986410.31 723005.68 MWD+IFR+MS 13748.32 51.30 277.98 9739.00 9691.00 6424.55 1453.52 8.00 5986414.32 722969.25 TSAD 13800.00 55.43 278.01 9769.83 9721.83 6430.32 1412.46 8.00 5986418.87 722928.03 MWD+IFR+MS 13900.00 63.43 278.06 9820.65 9772.65 6442.35 1327.28 8.00 5986428.37 722842.53 MWD+IFR+MS 14000.00 71.43 278.11 9859.00 9811.00 6455.33 1235.93 8.00 5986438.65 722750.84 MWD+IFR+MS 14100.00 79.43 278.15 9884.13 9836.13 6469.01 1140.19 8.00 5986449.49 722654.75 MWD+IFR+MS 14200.00 87.43 278.19 9895.56 9847.56 6483.12 1041.94 8.00 5986460.68 722556.13 MWD+IFR+MS 14224.90 89.42 278.20 9896.24 9848.24 6486.66 1017.30 8.00 5986463.50 722531.40 End Dir : 1422 14300.00 89.42 278.20 9897.00 9849.00 6497.38 942.97 0.00 5986472.01 722456.79 MWD+IFR+MS 14336.38 89.42 278.20 9897.36 9849.36 6502.57 906.97 0.00 5986476.13 722420.64 MWD+IFR+MS ~ . . BP BP Planning Report 14336.45 89.42 278.20 9897.37 9849.37 6502.58 906.90 0.00 5986476.14 722420.58 Start Dir 711 00 14400.00 89.71 282.64 9897.84 9849.84 6514.07 844.41 7.01 5986485.78 722357.78 MWD+IFR+MS 14462.35 90.00 287.00 9898.00 9850.00 6530.02 784.15 7.00 5986499.94 722297.08 NK-38A T1 14500.00 90.00 289.64 9898.00 9850.00 6541.85 748.42 7.00 5986510.71 722261.01 MWD+IFR+MS 14600.00 90.00 296.64 9898.00 9850.00 6581.12 656.51 7.00 5986547.23 722167.99 MWD+IFR+MS 14645.56 90.00 299.82 9898.00 9850.00 6602.66 616.38 7.00 5986567.58 722127.24 End Dir : 1464 14645.65 90.00 299.83 9898.00 9850.00 6602.71 616.30 7.00 5986567.63 722127.15 MWD+IFR+MS 14672.65 90.00 299.83 9898.00 9850.00 6616.14 592.88 0.00 5986580.36 722103.35 Start Dir 8/100 14672.69 90.00 299.83 9898.00 9850.00 6616.16 592.84 0.00 5986580.38 722103.31 MWD+IFR+MS 14700.00 90.00 302.02 9898.00 9850.00 6630.19 569.42 8.00 5986593.71 722079.48 MWD+IFR+MS 14800.00 90.00 310.00 9898.00 9850.00 6688.95 488.60 7.98 5986650.05 721996.96 MWD+IFR+MS 14900.00 90.00 318.02 9898.00 9850.00 6758.38 416.74 8.02 5986717.32 721923.09 MWD+IFR+MS 15000.00 90.00 326.02 9898.00 9850.00 6837.13 355.25 8.00 5986794.21 721859.29 MWD+IFR+MS 15044.94 90.00 329.61 9898.00 9850.00 6875.16 331.31 8.00 5986831.51 721834.25 End Dir : 1504 15044.96 90.00 329.61 9898.00 9850.00 6875.17 331.30 8.00 5986831.53 721834.24 MWD+IFR+MS 15094.20 90.00 329.61 9898.00 9850.00 6917.65 306.39 0.00 5986873.25 721808.08 Start Dir 8/100 15094.30 90.00 329.61 9898.00 9850.00 6917.74 306.34 0.00 5986873.33 721808.03 MWD+IFR+MS 15100.00 90.00 330.07 9898.00 9850.00 6922.66 303.48 8.00 5986878.17 721805.02 MWD+IFR+MS 15200.00 90.00 338.07 9898.00 9850.00 7012.52 259.78 8.00 5986966.70 721758.69 MWD+IFR+MS 15300.00 90.00 346.07 9898.00 9850.00 7107.59 229.02 8.00 5987060.80 721725.13 MWD+IFR+MS 15400.00 90.00 354.07 9898.00 9850.00 7206.01 211.79 8.00 5987158.67 721704.99 MWD+IFR+MS 15461.65 90.00 359.00 9898.00 9850.00 7267.52 208.06 8.00 5987220.04 721699.45 NK-38A T3 15500.00 90.00 2.07 9898.00 9850.00 7305.87 208.42 8.00 5987258.38 721698.67 MWD+IFR+MS 15517.54 90.00 3.47 9898.00 9850.00 7323.39 209.27 8.00 5987275.92 721699.00 End Dir : 1551 15517.59 90.00 3.48 9898.00 9850.00 7323.44 209.27 8.00 5987275.97 721699.00 MWD+IFR+MS 15579.83 90.00 3.48 9898.00 9850.00 7385.57 213.04 0.00 5987338.18 721700.93 MWD+IFR+MS 15579.85 90.00 3.48 9898.00 9850.00 7385.59 213.04 0.00 5987338.20 721700.93 Start Dir 4/1 00 15600.00 90.00 2.67 9898.00 9850.00 7405.71 214.12 4.00 5987358.34 721701.42 MWD+IFR+MS 15691.72 90.00 359.00 9898.00 9850.00 7497.40 215.46 4.00 5987450.03 721700.04 NK-38A T4 15700.00 90.00 359.33 9898.00 9850.00 7505.68 215.34 4.00 5987458.30 721699.68 MWD+IFR+MS 15761.19 90.00 1.78 9898.00 9850.00 7566.86 215.93 4.00 5987519.47 721698.46 End Dir : 1576 15761.20 90.00 1.78 9898.00 9850.00 7566.88 215.93 4.00 5987519.49 721698.46 MWD+IFR+MS 15800.00 90.00 1.78 9898.00 9850.00 7605.65 217.13 0.00 5987558.28 721698.51 MWD+IFR+MS 15900.00 90.00 1.78 9898.00 9850.00 7705.61 220.24 0.00 5987658.27 721698.66 MWD+IFR+MS 16000.00 90.00 1.78 9898.00 9850.00 7805.56 223.35 0.00 5987758.27 721698.81 MWD+IFR+MS 16100.00 90.00 1.78 9898.00 9850.00 7905.51 226.45 0.00 5987858.27 721698.96 MWD+IFR+MS 16200.00 90.00 1.78 9898.00 9850.00 8005.46 229.56 0.00 5987958.26 721699.10 MWD+IFR+MS 16300.00 90.00 1.78 9898.00 9850.00 8105.41 232.66 0.00 5988058.26 721699.25 MWD+IFR+MS 16400.00 90.00 1.78 9898.00 9850.00 8205.36 235.77 0.00 5988158.25 721699.40 MWD+IFR+MS 16500.00 90.00 1.78 9898.00 9850.00 8305.32 238.87 0.00 5988258.25 721699.54 MWD+IFR+MS 16600.00 90.00 1.78 9898.00 9850.00 8405.27 241.98 0.00 5988358.24 721699.69 MWD+IFR+MS 16700.00 90.00 1.78 9898.00 9850.00 8505.22 245.08 0.00 5988458.24 721699.84 MWD+IFR+MS 16800.00 90.00 1.78 9898.00 9850.00 8605.17 248.19 0.00 5988558.23 721699.99 MWD+IFR+MS 16841.00 90.00 1.78 9898.00 9850.00 8646.15 249.46 0.00 5988599.23 721700.05 4112" 16841.80 90.00 1.78 9898.00 9850.00 8646.95 249.49 0.00 5988600.03 721700.05 NK-38A T5 . TERRIE L HUBBLE BP EXPLORATION AK INC PO BOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 89-6/1252 162 "Mastercard Check" . DATE\\'~3'OL ~~ ~þ~~6CC, $ 100 ':LLAns First National Bank Alaska A~ho<..,. AK 99501 ~. 'èf~ MEMO )J\( -38ft 111 i_. _ .: . 2 5 2000 b 0': q q .1. I" b 2 2 ? It, . 5 5 b II- O. b 2 . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER /lIk - 3<rr A PTD# .2 CJ<!j - 2. t.¡ ) WELL NAME ;t78a X Development , . ServIce Exploration Stratigraphic CHECK WHAT ADD-ONS "CLUE"· APPLIES (OPTIONS) MULTI Tbe permit is for a new wellboresegment of LATERAL existing weD , Permit No, API No. . (If API Dum ber Production. should continue to be reponed as last two (2) digits a function 'of tbe original API number. stated are between 60-69) above. PILOT HOLE In accordance witb 20 AAC 25.005(1), aU (PH) records, data and logs acquired for tbe pilot X bole must be dearly differentiated In botb name (name on permit plus PH) µK.,...39JJ,1I and API Dum ber (SO-O¿,~~ " 70/80) from records, data and Jogs acquired for we)) (name on permit). SPACING Tbe permit is approved subject ·to full EXCEPTION compliance witb 20 AAC 25..0S5~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spa dng e:J ception. (Company Name) assumes tbe liability of any protest 10 tbe spacing .e~ception tbat may occur. DRY DITCH AU dry ditcb sample sets submitted to tbe SAMPLE Commission must be in no greater ·tban 30' sample intervals from below tbe permafrost or from wbere samples are first caugbt and ] 0' sample h:iter:vals tbrougb target zones. 0- Field & Pool PRUDHOE BAY, NIAK IV-SR UN OIL - 640147 Well Name: PRUDHOE BAY UN NIA NK-38A Program DEV Well bore seg D PTD#: 2042410 Company BP EXPLORATION (ALASKA) INC Initial ClassfType DEV /1-0IL GeoArea 890 Unit 11650 On/Off Shore Off Annular Disposal D Administration 1 EermiUee attaçhe_d _ _ . _ _ . . . _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . _ . . _ . Ye$ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _ . _ . 2 .Lease.n!Jmber .apprORriate . . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _Ye$ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ 3 _U.niq!Je weIlßa[Tle.and oumb.er . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . .Y.e$ . . . . . . . . . . . . . . . . . . . . . . . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ 4 WellloC<!ted in.a_d_efjne_d_pool _ _ _ _ _ _ . _ . No _ _ _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . . . . _ 5 WelUoC<!ted pr.operdistance from drilling !Jnitb.ound_ary_ . . _ _ _ _ _ _ _ _ _ _ _ _ . Ye$ _ _ _ _ _ . . ThelocationoJthjs_weJI çonform$ to all statewjd.e_spacingrules, RPC _ _ _ . _ _ _ _ _ _ _ _ _ _ . 6 WelUoC<!ted proper _distance from otlJer welJs _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . . _ Ye$ _ . . . . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . _ . 7 _S_uffiçienLacreage_aYailable jndrilling unjL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ye$ _ _ _ . . _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ . . . . 8 Jf.d_eviated, .is. weJlbore plaUncJuded _ _ _ _ _ _ . . . . _ _ _ _ _ _ _ _ _ Ye$ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ . _ _ _ _ . . _ _ . _ _ _ _ _ _ _ _ . . _ 9 Qperator only affected party _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ _ _ _ _ . _ . _ .. Ye$ _ _ . . . . _ . 10 _Qperator lJas_apprppriate_ bond inJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . . _ _ _ _ _ _ _ _ _ _ _ _Y.e$. _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ . . . _ _ . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . 11 P_ermit can be iS$ued wjtlJout CQn$ervation order _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ye$ _ _ _ _ _ _ _ _ _ . _ _ _ . . . . _ _ :~; 11/~;~004 ~~ -¿:~m~~:%~::;~~~:~t~~~~r:d~~:~::~-appr-oval - - - - - - - - - - - - - - - -~:: -.. - - -. - - - - - - - - - - - -. - - - - - - - - - - - . - - -.. - - - - - - - - - - - - - - -... - . 14 WellloC<!ted within area and slrata authorized by.lojectioo Order # (put loti in_c_omrn.e!lts) (For NA _ _ _ _ _ _ _ _ _ _ _ . . . . . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ 15 .AJlwelJs_within.1l4_mile_area_ofreyiewid_e!ltified(Fpr!!ervJG.e.w.ellonly). _. _... _ _ _ _ _ _ _ _ _NA.... _ _ _ _ _ _ _ _ _. _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _. 16 Pre-produ.ced injector; _duration of pre-pro_duction le$~ than 3 months (Forseryice well onJy) _ _NA _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ 17 ACMP F:indingof Con_sistency. h.as Þee_ni~s!Jed for thi$ project . . NA . _ _ _ _ . . . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . 18 19 20 21 22 23 24 25 26 27 Date 28 11/30/2004 29 30 31 32 33 34 Engineering Appr WGA Appr RPC 35 36 Date 37 11/29/2004 38 39 Geology Geologic Commissioner: 1>fS _Conductor string provided _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ NA . _ _ _ _ _ . . _ _ _ _ _ . _ _ _ S_urfaG.eca~ingprotect~ alLknown USDWs _ _ _ _ _ _ _ _ . . . _ . . _ _ _ _ _ _ _ _ _ . . . . . . NA _ _ _ _ _ _ _ _ . . _ _G.MT v.ol adequ_ate.to çirc_ulate on conductor & su.rf c,sg . . _ .NA _ _ _ _ . _ _ CMT vol adequ_ate.to tie-in long .string to_s!Jrf ç~Q. _ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . NA _ _ _ _ _ _ . . . _ . _ . _ _ _ _ _ _ _ . . . . . _CMT wilJ coyeraJI J<oownprod!Jctiye lJorizons_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Ye$ . . . _ _ . _ _ _ _ _ _ _ . . . . _ . . . . . _ _ _ . _ _ _ _ _ _Ca$ing designs adec¡uate tor C,T, B.&_Rermafr_o$t _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . . Yes. _ _ _ _ _ _ _ _ . _ _ . . . . _ _ Adequate.tan.kage_or reserye pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ Ye$ _ _ _ _ _ _ _ Nab.ors9ES, __ _ _ _ _ _ . _ _ _ . . _ _ _ _ _ . . . _ . . _ _ . _ _ . _ _ _ _ _ _ . . _ _ _ _ _ _ Ifa re-prill, has_a to:40;3 for abandonment bee!l approved. . . Ye$ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Adequate_\I\(ellbore ~eparatJo_n_propose_d_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y_e$ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ Jf.djv.erter req.uired, does jLmeet regulations_ _ _ _ _ _ _ _ _ . _ . . . . _ NA _ _ _ _ _ _ Sidetraçk.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ Drilli!lgfJujdRrogram$chematic.&eq.uipli$tadequate _ _..... _ _ _ _ .. Ye$_ _ _ _ _ _ _MaxMW.1.0.9_ppg. _ _. _... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _. _ _. _B.o.P_Es._d.o.lhey meet regulation _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _Ye$ _ _ . _ . . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ B_QPEpress rati!lg appropriate;.lest to.(put psig incommeots). . . _ _ _ _ _ _ _ _ _ _ _ _. Ye$ _ _ _ _ _ . . Test to AOOQ RsL _MSf' 4QOO psi. . _ _ _ _ _ _ _ _ _ _ . . . _ _ Choke manjfold comRlie~ w/API Rf'-53 (May 84) _ _ _ _ . . . . . _ _ _ _ _ _ _ _ _ _ . . Ye$ _ . . . . _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . _ . _ _ _ _ _ . . . . Work will occ_ur withoutoperationshutdown _ . . . . . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . Ye$ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _ Is pre~ence. of H2S gas probable _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ No_ _ _ _ _ _ . . NoLan H2S pad. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . MeçhanicaLcooditionof well$ within .1.\08. yerified (For service welJ only) _ NA _ _ _ _ . _ . . . _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ . _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - e - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - P.ermit c.an be iS$ued w!o hydrogen. s_ulfide measures _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ye$ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _D_ata.preseoted on polentialovel"Rre~s!Jœzone_s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ _ _ . . . . S_eismicanalysJs of slJallow gas_z_o!les_ . _ _ _ _ _ _ _ _ . . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ . . NA _S_eabed _condjtip!l $urvey(if off-shore) _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . . . . NA . _ Conta_ct na.melphoneJor_weekly progressreport$ [exploratpryonlYl . _ _ _ _ _ . _ _ _ _ . .NA _ _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Date: Engineering Commissioner: Date ~ ~ Public Commissioner Date /2./ { /1- 8RiiRI' §Yj- BY John K. Norman