Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-011 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI N WELL MPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned IZI Suspended 0 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 2 Exploratory 0 GINJ ❑ WINJ ❑ WAG 0 WDSPL 0 No.of Completions: Zero Service 0 Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 11/11/2015 - 205-011 315-478 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 3/25/2005. 50-029-20129-02-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 3/31/2005 - PBU C-08B Surface: 1666'FNL,879'FEL,Sec.19,T11N,R14E,UM- 9 Ref Elevations KB 65.09 - 17. Field/Pool(s): Top of Productive Interval: 2845'FSL,2087'FEL,Sec.18,T11N,R14E,UM GL 35.40 BF 33.24 PRUDHOE BAY,PRUDHOE OIL. Total Depth: 3555'FSL,88'FWL,Sec.17,T11N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 13090'/9010' ADL 028305 - 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 664509 - y- 5959556- Zone - ASP 4 -14636'/8952' ' 80-274 TPI: x- 663186 y- 5964039 Zone - ASP 4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 665343 y- 5964796 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes ❑ (attached) No II 13. Water Death.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 13372'/8999' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/EWR 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZEAMOUNT FT. CEMENTING RECORD PULLED TOP BOTTOM TOP BOTTOM 20" 94# H-40 33' 113' 33' 113' 26" 173 sx Cement 13-3/8" 68#/72# N-80 33' 2675' 33' 2675' 18-1/2" 3839 sx Permaftost II 11-3/4"x10-3/4" 55.5#/47# N-80 32' x9-5/8" 9007 32' 7953' 12-1/4" 1200 sx Halliburton Lite,200 sx Class'G' 7" 29# N-80 8409' 9584' 7661' 8427' 8-1/2" 500 sx Class'G' 4-1/2" 12.6# 1-80 9442' 13370' 8308' 8999' 6" 480sxClass'G' 2-7/8" 6.16# L-80 13314' 14636' 9000' 8952' 3-3/4" Uncemented Slotted Liner 24. Open to production or injection? Yes ❑ No El 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#L-80 9442' 9396'/8270' 5006) FEB 0 3 2016 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. w Was hydraulic fracturing used during completion? Yes ❑ No 0 , RECEIVE■ �I Per 20 AAC 25.283(i)(2)attach electronic and printed RECEIVED information DEC 0 9 2015 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED © 13090' Set Whipstock A®GCC 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ....IP. Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only vrt_ is/z3/ice ,. (----72-9K-7- RBDMS DEC 1 0 2015 '., . -- IG 28. CORE DATA • Conventional Core(s) Yes 0 No f • Sidewall Cores Yes 0 No 0 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 11498' 8975' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Zone 1B 11498' 8975' Kicked off from Parent Well 13372' 8999' - (C-08B) Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Gorrell,John Email: John.Gorrell@bp.com Printed Name: Joe Last a Title: Drilling Technologist • Signature: +1 907 564 4091 INSTRUCTIONSDate: 12/q/f G 1 J General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • C-08B Well History, (Pre-Rig Sidetrack) ACTMVMTYDATE j 1MMW ***WELL SHUT IN ON ARRIVAL***(ELINE GYRO) INITIAL T/I/O = 0/425/225 PSI MIRU ELINE EQUIPMENT. RIG UP GYRO TOOL AND RIH PDC MODE. 8/20/2015 ***JOB CONTINUED ON 21-AUG-2015*** T/I/O = 1460/174/209 Temp =SI Assist E-Line ( CTD ) Pumped 5 bbls neat meth down TBG followed by 270 bbls crude to load and secure well E-Line in contol of well upon 8/20/2015 departure ***JOB CONTINUED FROM 20-AUG-2015***(ELINE GYRO) LOG TO DEVIATION AT 10321'. LOG FROM DEVIATION UP TO 3300'AT 70FPM. SPOT COUNTS EVERY 100FT FROM 3300'TO SURFACE. FINAL T/I/O =0/200/200. WELL SI ON DEPARTURE. EXTENDED WAIT TIME TO DEPART LOCATION TO CLOSE PERMIT. 8/21/2015 ***JOB COMPLETED ON 21-AUG-2015*** T/I/O = MV/210/VAC. Temp =SI. Bleed IAP &OAP <50 psi (pre CTD). No AL. IA&OA FL near surface. Bled IAP from 210 psi to 0 psi in 5 hrs (gas/fluid)to slop tank. Monitor 30 min. IAP increased 10 psi. Final WHP's = MV/10/VAC. 10/22/2015 SV, SSV = C. WV, MV= LOTO. IA, OA= OTG. 16:00. T/I/O = MV/90/Vac. Temp = SI. WHPs (pre rig). No AL. IA&OA FL near surface. IAP increased 80 psi since 10/22/15 Bleed. 10/23/2015 SV, SSV=C. WV, MV = LOTO. IA& OA = OTG. NOVP. 0345. T/I/O =MV/5/130. Temp =SI. Bleed IAP to<50 psi (pre rig). No AL. Well is disconnected from the system, no well house, flow line, hand rail around swab platform. Talk w/WIE & pad op to bleed OAP to <50 psi. OA FL near surface. Bled OAP from 130 psi to 0 psi in 10 min (gas), held open bleed for 1 hr. Monitor for 30 min, during monitor OAP increased 15 psi. 10/25/2015 SV, SSV =C. WV, MV =LOTO. IA, OA =OTG. 22:35. T/I/O =MV/5/130. Temp =SI. WHP's (post OA bleed). No AL. Well is disconnected from the system, no well house, flow line, and no hand rail around swab platform. OAP increased 115 psi since 10/25/15 10/27/2015 SV, SSV =C. WV, MV =LOTO. IA, OA=OTG. 1400 T/I/O=VAC/0/150. Set 6"J TWC#419 @135" LTT TWC (PASSED). Install Nordic test spool #5. Torque to API SPECS. P/T test spool to 300 low, 5000 high for 5 min each. P/T under SV and top of SSV to 300 low, 3500 high for 5 min each . LTT above SV(PASSED). SEE LOG FOR DETAILS. RDMO ***JOB COMPLETE*** Final T/I/O=TWC/0/150. Hung TWC 10/29/2015 sign on MV. Hung Tree/Valve Pressure Test Record on MV T/I/O =TWC/5/155. Temp =SI. Bleed WHP's <50 psi (pre CTD). IA&OA FL near surface. Bled IAP from 5 psi to 0 psi in <5 min (gas/)to slop tank Bled OAP from 155 psi to 0 psi in 40 min (gas/fluid <5 gallons). Maintained open bleed on OA for—5.5 hrs due to history of repressurization. OAP increased 17 psi during final 30 min monitor. See log for details. Final WHP's =TWC/0/17. 10/30/2015 SV, SSV = C. WV, MV= C. IA, OA =OTG. 16:45. T/I/0= SSV/26/100. Temp =SI. WHP's. (Post Bleed). No well house, flow line or WH scaffold. IAP increased 26 psi &OAP increased 83 psi overnight. 10/31/2015 SV, WV& SSV = ?. MV = 0. IA&OA = OTG. NOVP. 16:00 T/I/O =TWC/5/155. Temp = SI. Bleed WHP's to 0 psi (pre CTD). IA&OA FL near surface. Bled IAP from 20 psi to 0 psi in 5 min (all gas). Bled OAP from 160 psi to 0 psi in 45 min (gas/fluid, —10 gallons). Monitored BUR. Maintained open bleed on OA for 1 hrs. Monitored BUR. OAP increased 30 psi. Bled OAP from 30 psi to 0 psi in 5 min. Final WHP's = TWC/0/0. 11/8/2015 SV, WV, SSV, MV= C. IA, OA = OTG. 0500 hrs. • • • North America-ALASKA-BP Page 1 a - Operation Summary Report Common Well Name:C-08 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/8/2015 End Date: X3-017DL-C:(3,272,814.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud DateMme:9/10/1973 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292012900 Active datum:C-08B @65.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/8/2015 18:00 - 21:30 3.50 MOB P PRE RIG RELEASED AT 18:00 FROM DS15-07D PULLED OFF WELL. CLEARED AND CLEANED AROUND WELLHEAD PUSHER/DRILLER PERFORMED ROUTE DRIVE 21:30 - 00:00 2.50 MOB P PRE START MOVING RIG FROM DS15 TO C-08 11/9/2015 21:00 - 22:00 1.00 BOPSUR N SFAL PRE REPLACED INNER REEL VALVE RE-TEST. GOOD TEST BOPE TEST COMPLETE BLEED DOWN. 22:00 - 00:00 2.00 CUT P PRE REVERSE CIRCULATE TO GET SLACK INTO REEL START CUTTING COIL CUT 234'COIL. PREP TO INSTALL COIL CONNECTOR INSTALLED CONNECTOR 00:00 - 04:00 4.00 MOB P PRE CONTINUE RIG MOVE FROM DS15 TO C-08. MOVE OFF DS-015 TO OXBOW,RIGHT ON SPINE TO TWIN TOWERS ROAD TO C-PAD ACCESS ROAD. TOTAL PAD TO PAD MOVE TIME 6.5 HRS. 04:00 - 06:00 2.00 MOB P PRE ARRIVE ON LOCATION PREP AREA -PJSM FOR PULLING OVR WELL -RIG ACCEPTED AT 05:00 -OPEN SWAB,SSV AND MASTER VALVES FOR THERMAL. 06:00 - 10:30 4.50 BOPSUR P PRE INSTALL FUSIBLE CAP ON SSV. PERFORM LTT ON SWAB AND MASTER VALVES. REMOVE TREE CAP,INSTALL BOPS. GREASE CREW ARRIVES,GREASE TREE VALVES. 10:30 - 11:30 1.00 BOPSUR P PRE INSTALL TEST PLUG IN SARBER SPOOL. STOP AND LAY TIMBERS AND PLYWOOD ACROSS CELLAR AREAAROUND TREE,SOME GAPS HERE. 11:30 - 16:00 4.50 BOPSUR P PRE FILL BOP STACK WITH WATER. LINE UP VALVES TO PERFORM SHELL TEST OF BOP AND CHOKE MANIFOLD. WSLAND DRILLER REVIEW PRESSURE XCHECK CARD AND RISK MITIGATIONS. START BOP TEST WITH SHELL TEST OF ENTIRE SYSTEM TO 4700 PSI. WITNESS WAIVER WAS RECEIVED VERBALLY FROM JEFF JONES,AOGCC 11-08-2015 TEST CHOKE MANIFOLD VALVES,ANNULAR, 2-3/8"PIPE/SLIP UPPER AND LOWER,AND BLIND SHEAR RAMS. 16:00 - 17:20 1.33 BOPSUR P PRE PERFORM DRAWDOWN TEST ON ACCUMULATOR. TEST VBR WITH 3-1/2"TEST JOINT. 17:20 - 17:40 0.33 BOPSUR P PRE PERFORM RIG EVAC DRILL WITH MEINHOLD CREW. ALL PERSONS MUSTER AND ARE ACCOUNTED FOR IN 2 MIN. CONDUCT AAR WITH THE CREW. Printed 11/23/2015 2:55:18PM • • North America-ALASKA-BP Page 2 d! Operation Summary Report Common Well Name:C-08 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/8/2015 End Date: X3-017DL-C:(3,272,814.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/10/1973 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292012900 Active datum:C-08B @65.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ustt) 17:40 - 20:15 2.58 BOPSUR P PRE CONTINUE TESTING ANNULAR WITH 3-1/2" TEST JOINT. 20:15 - 21:00 0.75 BOPSUR P PRE STABBED ON. PRESSURE UP FOR PACKOFF /INNER REEL VALVE ISOLATED KILL HCR / ISOLATED FIRST VALVE UPSTREAM OF INNER REEL. LEAK STOPPED. BLOW COIL BACK. PREP FOR INNER REEL VALVE REPLACEMENT. 11/10/2015 00:00 - 01:00 1.00 MOB P PRE PULL TESTED COIL CONNECTOR TO 35K. GOOD PT 300/4300 GOOD TEST 01:00 - 01:30 0.50 MOB P PRE MAKE UP STINGER AND NOZZLE. PUMP SLACK FORWARD 01:30 - 02:00 0.50 MOB P PRE TEST CABLE. GOOD TEST INSTALL BHI UQC RETEST. GOOD 02:00 - 02:30 0.50 MOB P PRE PRESSURE TEST UQC 300/4000. GOOD TEST. 02:30 - 02:40 0.17 MOB P PRE RIG EVACUATION WITH ORLOFFS CREW. "FIRE IN THE CELLAR" PERFORM AFTER ACTION REVIEW. 02:40 - 03:30 0.83 RIGU P PRE PJSM. BLOW DOWN STACK. PULL TEST PLUG OUT OF STACK. PJSM FOR PULLING TWC 03:30 - 06:00 2.50 RIGU P PRE MOBILISING EQUIPMENT TO FLOOR PJSM, SPACE OUT PRESSURE TESTING LUBRICATOR,GOOD. 06:00 - 07:30 1.50 RIGU P PRE PULL TWC. TROUBLE GETTING IT ABOVE HANGER,BLEED OFF WHP TO TIGER TANK WHILE WORKING IT OUT OF PROFILE. PULL TWC UP AND CLOSE MASTER,BLEED OFF,CLOSE SWAB. 07:30 - 09:30 2.00 RIGU P PRE OFFLOAD BPV LUBRICATOR AND PULLING TOOLS. PJSM FOR TESTING UQC CHECKS AND LUBRICATOR BREAK. TEST BREAK AND CHECK VALVES TO 250/ 3500 PSI,GOOD. SPOT TRUCKS,BLEED TRAILER AND MEOH PUP FOR BULLHEAD. 09:30 - 11:20 1.83 RIGU P PRE PJSM FOR BULLHEAD KILL OF WELL. WSLAND DRILLER PERFORM PRESSURE XCHECK VERIFICATION. START BULLHEAD WITH 5 BBLS MEOH DOWN WELL. PUMP 300 BBLS(1.5X TUBING)DOWN WELL AT 5 BPM. PUMP 27 BBLS HI-VIS. FINAL WI-IP IS 604 PSI. 11:20 - 12:00 0.67 RIGU P PRE SHUT DOWN,WELL IS ON VAC. OPEN CHOKE,PUMP DOWN CT TO FILL WELL,ASSESS STATIC LOSS RATE WHILE LOADING WHIPSTOCK AND MILLING TOOLS ONTO RIG. INITIAL LOSS RATE ABOUT 90 BBL/HR, HOWEVER HI-VIS HAS NOT YET REACHED THE PERFS. Printed 11/23/2015 2:55:18PM • • North America-ALASKA-BP Page 3 err Operation Summary Report Common Well Name:C-08 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/8/2015 End Date: X3-017DL-C:(3,272,814.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/me:9/10/1973 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292012900 Active datum:C-08B @65.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 RIGU P PRE SHUT IN WELL AND PUMP ANOTHER 100 BBLS/3.3 BPM TO SPOT HI-VIS JUST ABOVE PERFS. FINAL WHP IS 930 PSI. 12:30 - 13:30 1.00 RIGU P PRE OPEN WELL AND ASSESS STATIC LOSS RATE, NOW AROUND 30-40 BBL/HR. MOVE INJECTOR OFF WELL AND OVER CIRC HOLE. INSTALL NIGHT CAP AND FILL ACROSS TOP. LOSS RATE NOW<5 BBL/HR. 13:30 - 14:30 1.00 STWHIP P WEXIT PJSM FOR PICKING UP BHA#1. MAKE UP BHA#1-WHIPSTOCK BHA. BHA OAL=75.61 FT. 14:30 - 16:45 2.25 STWHIP P WEXIT RIH WITH BHA#1. TAKE RETURNS THROUGH MGS FOR FIRST TRIP IN AS A PRECAUTION. SLOW RIH TO AROUND 50-60 FT/MIN AFTER REACHING PERFORATIONS. 16:45 - 17:50 1.08 STWHIP P WEXIT LOG GR FROM 12480 FT. CORRECT-15 FT. 17:50 - 19:20 1.50 STWHIP P WEXIT RIH TO 13,090 FT. LOG CCL FROM 13102FTTO 12800FT,CIRC 0.25BPM/1000PSI THRU EDC. 19:20 - 19:30 0.17 STWHIP P WEXIT CLOSE EDC. SET WHIPSTOCK TOP AT 13090FT 225TF.SET 3K DOWN. 19:30 - 22:25 2.92 STWHIP P WEXIT POH.CIRC 8.31 PPG 1%KCL AT 1.35BPM. PJSM REGARDING HANDLING BHA WHILE POH. 22:25 - 23:05 0.67 STWHIP P WEXIT POP OFF WELL.PLACE INJECTOR OVER BUNG HOLE.BLOW DOWN BHA.LD BHA. SHUT SWAB. 23:05 - 23:50 0.75 STWHIP P WEXIT FLUSH OUT MGS. 23:50 - 00:00 0.17 STWHIP P WEXIT MU WINDOW MILLING BHA. 11/11/2015 00:00 - 00:30 0.50 STWHIP P WEXIT STAB ONTO WELL.POWER UP&TEST TOOLS.TEST QTS.SET COUNTERS. 00:30 - 01:35 1.08 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA.CIRC AT 1 BPM/400PSI. 01:35 - 01:55 0.33 STWHIP N RREP 4,500.00 WEXIT STOP RIH.10"SUCTION FEEDING PUMP 1 HAS DEVELOPED A LEAK IN THE ALLEY WAY BETWEEN PUMP ROOM 1&PUMP ROOM 2.2 GALLONS OF 1%KCL OUTSIDE OF PUMP ROOM 1.ISOLATE PUMP 1 SUCTION LINE. ORDER SPARE HOT OIL TRUCK&HEATERS. NOTIFY SRT,FIELD SUPERINTENDENT,ODE. 01:55 - 02:45 0.83 STWHIP N RREP 4,500.00 WEXIT POH.CIRC 1.2BPM/337PSI. 02:45 - 07:00 4.25 STWHIP N RREP 4,500.00 WEXIT STOP AT 100FT.CIRCULATE USING C-PUMP. 0.36BPM/70PSI WHILE FORMULATING A PLAN FORWARD. 07:00 - 08:30 1.50 STWHIP N RREP 4,500.00 WEXIT HOOK UP VAC TRUCK TO FEED PUMP#1,TO SEE IF IT CAN BE USED ASA CONTINGENCY WHILE MILLING WINDOW. PUMP#2 IS UNAFFECTED BY THE SUCTION LINE LEAK. ABLE TO PUMP 3 BPM THROUGH PUMP#1 THIS WAY. Printed 11/23/2015 2:55:18PM • S North America-ALASKA-BP Page 419h- Operation Summary Report Common Well Name:C-08 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/8/2015 End Date: X3-017DL-C:(3,272,814.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 2 Spud Date/me:9/10/1973 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292012900 Active datum:C-08B @65.09usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 09:30 1.00 STWHIP N RREP 4,500.00 WEXIT HOOK UP A2"SUCTION LINE TO BYPASS THE LEAKING 10"GOING FROM PUMP ROOM#2 TO#1. PERFORM 15 MIN PRESSURE TEST WITH CHARGE PUMP PRESSURE TO ENSURE THE LEAK IS ISOLATED AT EITHER END WHILE USING THE 2"BYPASS. NO LEAKS SEEN. PUMP 3 BPM THROUGH 2"HOSE WITH PUMP #1,NO ISSUES. 09:30 - 12:45 3.25 STWHIP P WEXIT RIH WITH WINDOW MILL. TIE IN DEPTH FROM 12,500 FT. START NEW MUD DOWN THE CT. CORRECT-15 FT. CONTINUE RIH. 12:45 - 14:00 1.25 STWHIP P WEXIT DRY TAG AT 13,090 FT. PICK UP AND CLOSE EDC. • FINISH CIRCULATING MUD TO SURFACE AND GET SPPS. PUMP#1: 0.5 BPM=721 PSI,1.0 BPM=989 PSI. PUMP#2: 0.5 BPM=718 PSI,1.0 BPM=985 PSI. 14:00 - 15:50 1.83 STWHIP P WEXIT MILL WINDOW FROM 13,090 FT. • C.-- t✓ 2.82/2.81 BPM @ 2430 PSI,1.38K DWOB. PVT=47 BBLS. 15:50 - 17:10 1.33 STWHIP P WEXIT MILL WINDOW FROM 13,091.20 FT. 2.81/2.81 BPM @ 2440 PSI,DWOB=2.19K. PVT=45 BBLS. 17:10 - 00:00 6.83 STWHIP P WEXIT MILL WINDOW FROM 13,092 FT. 2.82/2.82 BPM @ 2490 PSI,DWOB=3.09K. PVT=315 BBLS. MILL TO MIDNIGHT DEPTH OF 13,098FT. 11/12/2015 00:00 - 01:35 1.58 STWHIP P WEXIT CONTINUE TO MILL WINDOW FROM 13,098 FT. 2.82/2.82 BPM @ 2390 PSI,DWOB=1.09K. PVT=313 BBLS. MILL TO BOTTOM OF WINDOW AT 13100FT. 01:35 - 02:30 0.92 STWHIP P WEXIT MILL RAT HOLE FROM 13100FT. 2.82/2.82 BPM @ 2640 PSI,DWOB=3.09K. PVT=313 BBLS. MILL TO 13109FT. 02:30 - 04:05 1.58 STWHIP P WEXIT REAM WINDOWN 3 TIMES. DRY DRIFT-CLEAN. OPEN EDC. 04:05 - 06:30 2.42 STWHIP P WEXIT POH. CIRC 3.22BPM/2200PSI WHILE POH. 06:30 - 08:30 2.00 STWHIP P WEXIT PJSM WHILE POOH. TRIP SHEET IS-3 BBLS TO THIS POINT. 10 MIN PUMPS OFF FLOCHECKAT SURFACE IS GOOD. L/D MILLING BHA,MILL AND REAMER ARE 3.79"GO,3.78"NO-GO. M/U BHA#3,LATERAL DRILLING BHA. 1.1 DEG AKO ULS MOTOR WITH RES,3.75 X 4.25 HCC BIT. BHA OAL=80.68 FT. 08:30 - 11:00 2.50 DRILL P PROD1 TEST TOOL,TEST QTS,ZERO COUNTERS. RIH WITH BHA#3. AROUND 11,000 FT TROUBLESHOOT INJECTOR ISSUES,RIH SPEED IS SURGING A BIT IN HIGH GEAR. Printed 11/23/2015 2:55:18PM TREE 6-3/8"CAN WELLTAD McE-VOY • -OFETY NOTES: WELL ANGLE>70°@ 10207'"'MAX DO ACTUATOR_ AXELSON GLEG:28.4°@ 13476'***DO NOT TEST CSG OVER KB.aEV: 55.74' __._.._- 2500 PSI*** _O OP13-3/8"CSG,68#, —j 1653' 142' IH 11-3/4"X 9-518"THERMOCASE II Max Angle= 95° 30 XO TO 72#N-80 BUTT n9 @ 131 / _ —{10-3/4"CSG X 9-5/8"CSG XO Datum MD= 10631' 10-3/4"CSG,45.5#, H 1900' \ —_--- 205W H 9-5/8"FOC Datum TVD: 8800'SS L-80,D=9.953" ' 2103' —19-518"PBR,D=? 13-3/8"CSG,72#,N-80,13=12.347" H 2092' J I `_ 2112' H 9-518"SEAL ASSY,D=? Minimum ID =2.377" @ 13317' --------- 2126' H9-5/8"FOC 2-7/8" STL LNR PIN 2139' H4-1/2"OTIS SSSVN,13=3.813" 9-5/8"FOC --I 2647' H— — GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"FOC —1 4203' J� "1 3 4329 4226 37 TDP DMY RM 0 06/23/15 2 7509 6750 39 TDP DMY RM 0 06/23/15 1 8283 7359 36 TDP DMY RM 0 04/06/05 7"TBG STUB(XX/XX/XX) —{ 840T J: ,r__, 8409' H 7"PBI,D8449' H 9-5/8"X 7"LTPw/HGR,ID= 9-5/8"CSG,47#,L-80,D=8-681" H 8998' ' 9390' H4-1/2"OTIS X MP,D=3.813" E. X 9401' —17^X 4-1/2"BKR S-3 PKI,D=3.958" 9425' HI4-1/2"OTB X IAP,D=3.813" 4-1/2"TBG,12.6#,L-80 NSCT, —I 9448' ' ' 9436' H4-1/2"OTB XN NIS,ID=3.80"(MILLED 03/14/05) .0152 bpf,ID=3.958" 7"X 4-1/2"TMV TIEBACK SLV,ID=5.282" --I 9448' ' 0448' H 4-1/2"WLEG,D=3.958" 7"X 4-1/2"TM!S-6 LNR TOP PKR,D=4.340" H 9458' C M) J / H 9457' ELTT LOG??/??/?? 7"X 5"TM/LNR HGR,ID=4-335" - I 9460' '' 7" MLLOUT WINDOW(C-08A)9584'-9634' 7"LNR,29#,N-80,.0371 bpf,13=6.184" H 9584' 4-1/2"WHIPSTOCK(11/10/15) H 13090' TOP OF 2-718"LNR — 13315' ? —FISH-2 RBR ELBvE NTS& 4-1/2"WHESTOCK(03/27/05)w/RA TAG @ 13381' — 13370' 1 STIFFBNAVG RING 4-1/2"LNR,12.6#,L-80,.0152 bpf,D=3.958" — '-13370 1 13158' H4-112"HES EVO TREVE PLUG(03/23/15) _ PERFORATIONSUMMARY 13170' H4-1/2"BOTCBP(01/16115) REF LOG: MWD GR ON 04/29/95 1.1 13314' H13.70"DEPLOY SLV,D=3.00" A NGLE AT TOP PERF: 81°@ 11731' 13315' H 3-1/2"X 2-7/8"XO,D=2-387" Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-3/4" 4 11731-11760 0 05/08/95 MLLOUT WINDOW(C-086)13370'-13375' 2-3/4" 4 11826 12206 0 05/08/95 1..........: ` 2-3/4" 4 12260-12450 0 05/08/95 2-3/4" 4 12600-12622 0 05/08/95 �.��������� 2-3/4" 4 12622-13140 0 05/08/95 iiiii , ` ..... \ 2-3/4" 4 13260-13377 05/08/95 2-7/8"LNR,6.16#, L-80 STL, H 14634' SLOT 4 13316-14603 03/31/05 -0058 bpf,D=2.441" TD(3_80"DIAMETER) —{ 14636' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/11/78 N-18E ORIGINAL COMPLETION 07/28/15 PJC CSG/LNR/TBG-PRE RIG CLEANUP WELL: C-08B 05/07/95 D-14 SIDETRACK(C-08A) PERMIT No:2050110 04101/05NORDNC 1 CTD SIDETRACK(C-08B) API No: 50-029-20129-02 12/14/10 CSR/PJC PERF/LNR CORRECTIONS SEC 19,T11 N,R14E 1666'FNL&879'FEL 01/20/15 SRD/JMD SET BOT CBP(01/16/15) 03/23/15 RMFVPJC SET EVO TREVE PLUG BP Exploration(Alaska) 235- O1` Gyrodata Incorporated • • 2-f0241 23000 Northwest Lake Dr. gyro/data Houston,Texas 77095 Precision Wellbore Placement T: (281)213-6300 • F: (281)213-6301 eCEt�ei SCANNED JUN 0 7 2016 Scj? SURVEY REPORT BP Exploration C-Pad #C-08B Wellhead Prudhoe Bay, North Slope Borough, AK AK0815GCM162 20 August 2015 RIGHT PLACE FIRST TIME � c- www.gyrodata.com ,. Gyrodata Incorporated 23000 Northwest Lake Dr. gyro/data Houston, Texas 77095 Precision Wellbore Placement T: (281) 213-6300 • F: (281) 213-6301 September 8, 2015 State of Alaska -AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: C-Pad, Well # C-08B Prudhoe Bay, Alaska Enclosed, please find one (1) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Kelly Landram Senior Operations Assistant RIGHT PLACE FIRST TIME Ct: www.gyrodata.com 0 0 ) o4-4M 0 0 ) 0 z © / \/ 0f / 0 § & % k , 0 \ k .2 — $ 2 a \ / $m /\ ƒ § k 0 0 / k / 0 0 7 *0 0 © 0 § 0 t \ bD0 •52. 7 0 O 0 / B § % - U w cd / / k \ \ \ \ N •/ \ / -4.1 \ \ 0 / \ U / 2 \ ¥ / / / / < $ / % ¢ / \ Q P. Q2 _ \ mc / / / $ O 2 t \ % \ / 0P ; w M \ / � \ U \ & 2 'm a 2 \ 7 \ U 0 / 27 o © 4x 2 / / & QN \ 0 7 o\ N0? / k d< E , 0 - 2 / fo / \ \ \§ /§ k Z o0 0 9 00 > 0 > / ƒ C4 \ U / @ - - • • i 44 w 3 33333 333344 4444444404 w O crvicr N N oot0N vl t` -+ C\ M O O O N M v1 t� C� 0 00 'r - N � N 01 N N 0 W O 0 00000 -• 0006 660 -4 --4 N Oz z oo on oo on GO GO COO GO Ul on 00 00 00 00 00 c0 O 0 0 0 cn O1 00 00 N N M O N N 01 v1 N00 v) Z O 0 OVDM ,-, - VD Ch 0041M 410ooC1 [� In W O 0 ,- o N 00 '--ANN Mme' vi mi CO N000 0— N Q 0 E, o4 W N r-, O E O o0M -! NN d. 0NN00 .1- '1.. r- (-el N 0 r/C�! (jp o w 0 or; a� •-• oo N In CO rN CO 4-) 4 en — a O ,-, W o 0 CN CA 01 C. 00 00 N N N N N N N i C/O 0 M N Cl Cl .-, .-. .-r ,-. .-, ,-, r, ,...4 ,-i 1-. ... r. 0 Q . *' Nts41M -, 0NNVC01 In Vs Ch 0O\ is OO d oo •-, NM d d Inv1m6 1 00O\ -— (Ni a) a w U4• a, H 3 0 Q � O- 0 � ( zo 0a Q oz Z 0 Z o E,._, W o 0 0 Ch 01 rn o0 coo 0o 00 r r` CO 41 .d- ct CD 00 o o0 a, O rn 0 0) Ch c\ oh as al of a of Ch O U H ami o Q o 0 o 0 rn CA o Os c1 0; a; 0; o; 0; o 0\ rn [., P-r y E > 0 0 0 01 01 01 a1 a1 a1 c1 01 01 01 01 01 01 Ch to „/ (al 4-, _ W g4 •• Cl M M 4 In VD N 00 01 O --'- Cl M moi' 41 CO N I W A Fq W C7 ..-, r+1 •+I -, r .- Q A w r 0� 00 cot W � `to` 0 AQ - eenN000 - No7vl ry � COC+1 ~ O U' W 4) C) o �'' z44 3 0 00000 00000 00000 0 Q '73 > o L." k. Ocn ¢ d on v1N10toN v1 N 0000 ,--, t, l Ov1vD 00 bA Or-, a ,r o OMS--, 4no 0* NVOC cr. OA S. Mv? Oh d; y O E' vi o �r M �t -, S O -. 00 N •.., CO •-• 00 .-• 4 t` -04 0001 x10101 00 v1 r N C` CO Cs CO v1 In CO '� pCNI ox M ._, - .. - .� ,_.. - - - ._. ._, ._. - - - CA ,-1 o7o 0 0 U 05400x1 N 'fl NCOO\ 01N MN N NCOO0 N op 0\ v) bU o Q N d. 4 4 V, d, d. M d; v) r` 10 VO VO 4. d. p., � 7 ,� 0 H 0 00000 00000 00000 o E-' oo G C) Ww S`� , H A o A S d' Q4.1� 1p cid 00 ,3 N Q ic ,-,1 c) .--, -c) 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PQFC }, ood Wo 00000 00000 00000 0 .._...c.) a 0 O O Ea O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DI 0 <G W w . a z .- NMS v, 1p l� Oo rnO r+4 +. �, .�+ `.-D ,.. I2,1 A • • i 4"4 " 33333 33333 33333 333 ken ,-. kin O\ M VO M 00 00 00 M d' M d' O N C- CO C- v) 00 ^, .-. M * N N ,-- NN C 000 M '0 o0 000 '.000M Oo0O\ 4.1 (Ni (Ni N -4 CD (Ni M d' vi vl N -. N r M0 M rn 00 0 v1 O v5 -- en en r - vI '.D '.O O H '...' 2 24.4 � v) ,4v1 ov) wwcn ww ,nwv) zzzzz zzz OOMO1 M C` d' 00et MM vl vl M000 d' x-, 00 N \OMN by d, d' d; O ,, C` vo v? 00 ,--, M '.D O N Q 'cF 00 ,-� v7 0 '.0 W u Md- vl '.O VO vlv vivl vOO\ OC` O OOMtOo OMvi ^r .-. ,-. ,--, .-. .-i .r .-. ,--, ^', "" N ^-' ^- ,-. ^-, .--, .--, N N N Z HChan ,-, ',t000010 •-- o oovWWVnrn rrnoc ; r• N voNo O O N vi O N M N 0 l0 co or; 00 N O l 0; M 0 0 0 0 C` N C� N 00 00 O\ O\ O 0\ 00 00 00 N 00 00 00 O1 C\ O1 01 H --+ ,.. * * ,. ,--IN ^-i � � 1-4N NNNNN NNN UpN � N '.0 ,--. a' ONVD Vo d; d; 0000 Ovia, �� CO ..., N O Md' vlvO vO vlvOvOv0 t-: mOC-ZN oO vlOVON 00vl ,-. U 0 Cl) ed a 0 .< VD M M N N 0 C N N '.0 to O N . 00 + v 0' '.0 0" N 0 O 0E--( 0' < Q CN 0\ 0000 0000 00 00 N t"- N N M C� O cn Ln l� O� .� a a) Marna\ a\ o; ola; ori a; 4; 0' 0' 0' oov6ovirn MN V. 4� N000' 0 - NMd' vo '.DascNctsm N000' O ChMCN - N MMM M 'cPrf' ✓ W ,--. — ^-- N NNNNN NNNNm MMMMM MMM N ,, i-i Q -4 ti H Cd W ' d' '.0 drn. 0 M c' rn to '.0 ", ,-+ d' 0 ^- N 'ci- vo N N CS a Ij Di) O d. tOto O 0 (NI C'- 00M d MC N cv --tm 0 Q. W N OO 6000 00000 NO *-AMM MMMMN ^-, NN 0) C7 Z H ,, ,: M — 0000 toN '.O MMVI ,-t00 N 'D \0 %G0 -. mkt-) 71 NM "O ,n o00MNO N01v? 'Od VIt- [- "00' 000' v? 0 (Ni O N 00 O O to to ,-.. 00 N vi O N O_ 00 tri M N N N (n ,-.. - NN NNNNNNNN ,^m-. ,m-. rncmne MNNNN NNN ,.... .-.. NN N tICIU 00 d• d• d' 00 N to 00 ' d• 0mO d• 00 d• 0 0 ,, vl ,-, 4 G40 U bio , ,o , (.... o mod; 1---„ c" ,..00, 00No. � d; a` '0 P. to .a OOOO x ,-• 000 ,-.. � OMv5 O' NNMd' d' d' vi O al d O Q cti W ,� N 9 ^2 0000 00000 00000 00000 000 0 �, 0000 00000 00000 00000 0• 0 t a 8 6666 0 0 0_ 0 0 0 0 0 66666 0 0 0 _0 O O N to N O N to ^~� o Z "` W - - NN NNNNN NNNNM mmneee MMM p., ) o o Q al:I ✓ ati Ir • r • N 33 33333 33333 33333 33333 v) .-• Ctm ,-• NO NOe ':tN Vn - C, OO 'O Ne N00 IV)C/j ,-. 40 N OO ,--. ,t 00 d: -- 0 -. MN N000 0h ---< <n0V0 (S) MOi 40M0N N VM —. O\ ) • ^ 0\ 00t� vd i "a' MCnN Ey NN 000\ 00 - NNrM �' , .-.r .. r. .-.40 \O N000\ 0 NMd' E-+ ,-. . ,-. NNNNN • 24, OOO zz Z2ZZ2 zzzzz ZZZZZ zzzzz zZZZ O\ 0NNONO '00OC^ MO\ - ,, M \Ovt koVl0000 MM trOOMCN \CNO+ v -. OON \OM NMV) 00M wU o6 -• 4 C` •-• .4 00 N 46 •- vi O lei C vi C 46 N 06 Ti O C` N M M en V Tt d' ken 41 \O \D Cs Cs 00 00 O\ C\ O O ,-. N N z N Vi 00 .-, d-. N - 71: Is C M VD O\ Cl 'f C' Cl VI 00 .-, MP: N ... NNNc,.; en r4 4w'0 4345s: ss: O O\ O\ 0\ O\ O\ 0\ C\ O\ O\ 0\ O\ O\ O\ C\ Q\ C C\ O\ T O\ O\ O\ 1.-"7:=J NN NNNNN NNNNN N N N N N NNNNN en N 4140 0\ .4NNM tNon ,1cl r. 0\ \0 \000 en co. Nvir+ O +J 00 vi N000 \0 N •-. 0Ch00 [- NNN00 CiNdr U Hi til-I) Cs 00 4400 .-. .N. ,m-. .�. -' -4 - .-. 000\ 0N NNNNN N N NNNNN N N N 0 A Cip O\ C\ CON Nth .-IMv1 \DCN \O 0 4DOcn \ON ,O pi H N trio; mr` .-- vi00 Nvta; Nvi o6 -. 4s6. N In N. ++ H p'' G) 4000 •--• M \0000 MvtNON TtNO\ ,. �t \OooONIn U W ^ 4-i ct d' In 4'1 v1 Vn \D \O \O \D is Cs is is is 00 00 00 00 C\ O\ C\ F-1 MM M M M M M M M M M M M M M M M M M M M M 0 A -, 0H zi a \O 00 r-+ Cl Cs O\ O O N 00 0\ O •-� M M r+ M 7t. M M \O 1:0 00 \O N -. \O \O O N N41 V1 00 00 \O Cs In en t---. Ch 0\ V 0 W O C) NN •--. NN •--- N NNNNN ,-. NNNM NN •--- •-• N Q cn/ Z H N \D O O O\ - M 0\ 00 .0 Cr 00 kr) 'et n M aMN of 000 - 00 MINNNN 'et0 \ONO\ N �n \ON0 ' v1 V1 4O 46 N N 00 00 0\ 0\ O 0 -. o. N N co; M m M Ti .-O O\ 0\ a1 O\ 4\ 0\ 0\ O\ O\ 0\ 4\ O 00000 00000 NN NNNNN N N N N M M M M M M M M M M M N U bA .- 00O N O' � OMO Tr ChQom\ \O N \O n O' Vl M O\ d-. O\ M •-, 0.4 in N 4646 N N00o00\ 0i 00 •-+ N NMM 4 In v14) 40N00 .-4 .--� " . . . . . NNNN NNNNN NNNNN H ti 00 N cd .1. d' N O Wr-� x 0 0 0 0 0 0 0 O O O OO 00 ° 00 0 0 0 0 0 �, ✓ E--+ 00 00000 00000 0000 O 00000 U O v1 0 v1 0 In 0 In O v1 0 vi 0 v1 0 V7 0 vi O v1 0 V7 0 'g z W 4) CNO N41NON VIC- ON v1 Cs CN VI Cs ONVnN0 .=-14-ti -t Vl v) V1 V1 \O \D 40 4O Cs Cs Cs Cs 00 00 00 00 O\ C\ 0\ O\ O a71.3 o 0 �T� ^ M M M M M M M M M M M M M M M M M M M M M 'd' g0 i4 ti FSL^ F-� F " • 10 r 33333 - 33333 33333 33333 N 00 Q\ M N 00 N , m N Q\ 00 O V1 M vl \O - M 00 vlvll� NO Q\ cm00 �n MMvIQ\ M 1.....: ,_ _ 0,: c, , H NNcsim d\ O1- o00 Nd \Ooo .. Mvil� t- oo r vl \O NooO\ 0 .-+ NM4n VD N ooQ\ ' NM .k- 'n 'Q N y .< NNNNN MMMMM flMMT .1 d' d' d' d' d' d' p N (9w zz zzzzz pp�-�iO zzzzz zzzzz zzzzz zzzz zzzzz z Md' vlvl \O d' V7M4Dfl OSvl ,. d' Nvld' d0 0 0000 .1. 0N \O \000 NNin4IVO O1Mom0 41 W d O � vlN 6Nvicn - 0 oeiN v6vi d d oricn cNi (Ni M d' d' vl \0 NN00010 ---. -^ Nmd' vl \0N000\ O . . . . . - - --+ *-+ N NNNNN NNNNN M ; x H 0N4) h00 . d' \0NM + Mv1N00 ON v11s.: 0 m R ,I'.) 00 00 00 00 00 c:1' 'C\ O\ O; OOo00 + '- '-" N N Q) 0 O\ C\ C Q C\ Q', O10\ 00000 00000 0 NNNNN NNNNN M m M m M M M m m m m 0o OoO0m0\ O\ N 'OMmN 0, ,,0 .0s — ins , „..) , M O a-+ tri O N v.; N \C o d' M 00 m O\ d- 0\ d' 00 N vt N Q) 0.00 .--, Nm 't QNO\ 0 + md' \ON O\ ONM VI \D U E- eN N N M M M m M m m d' 44444 d' vl vl vl vl v.) Q ,-y cd ,.- o < = od' ''-' — Nd' — m00d' — 001� Q\ \0 0\ 000\ hd' V'1 w \OM00 �--� MMNO\ d. 000, 0, 1----1: OoO � N N d; U 1�0) m vi N 00 0 -. N m ri d' d d d d d' d' m M 1/40 F"{ (1t 0 1- 0\ --. on VD 000N 1' \0 000Nd' V:, 000 N NTvl'.0 00 W A4'4 U M M dd' d' dd' d' d' d' d' d' d' d' d' dd' d' d' d' d' N Q d CLS W \ vnoMNwn N0\ MOM .1• 41 \0 V'1 � r. 4100d' oo \O 1C3 a�, bD O 00 .--, V7 .^ d' •-• VDv100N 4D4DN Cr% N. N \O MN v) as O 0 W U O mmMm NNNNN NMNN � NviN \O \O d >, Q C7 Z H vlN,-+ r+ ' m4m0 . 0 .(1- NON O\ d' 4n0N 0 tb --: N4, (n ).0 l; o? ONO --+ M ).OQ\ �--� d: NmvOMM ,-+ U 00000 00000 vi vlvito \D t� o00Nd Zj 00000 00 � -... ^-, '--. M M M M M M M M M M M M M M M M M M M M m N + U CJ 00 '0 d' M O\ M O M M - 4D +n O\ N O 00 Q\ un ,, ---- m f:00v1 M N O 00 d' '--' to d. •-+ N1/40 "-" ChM � \Od; N d' a to 000\ 0 -' Nrion vi vi v6 NN00 00Nv.) 4on N ' ry N N M M M M m M M M M M M M M M M M M M M H -c) 0e) N Cd d' ,=,� 00000 00000 00000 00000 0 �U o H +� 00. 000 00000 00000 00060 0 N viovi0vi OviCvi0 vioviOvi Oviovi0 vi . 'rte c4Qt N N �nNONy1NONvl NONv) S ONv) N0 N ~' , W 4i d6 d0d0d d 44444 N N 4dM VMdm4 d4d4444 d a °) oo � Q = 2' ati • • 4 3333 33333 33333 33333 333 Cl C\ N N 'O ---- N O M N (--- 0 N M -. O V) N VD e. e. V) Ci) 00C e. on voO4cr! 4 OVDcle. 6 Ch 00 - N00 ON d; W v5 wi vi Ti Mencv -. -" -• 0000 Ch CCQ O\ .::: 000 000, 0—, (NI Met 41 VD 1- 000\ 0 .-+ e. NM4vn N00C\ E.-( < .4. d' 41 h V) 41 V) V) 41 Vi v) Vo to Vo \D \D VO V0 VD VD \o p N ZZZz ZZZZZ ZZZZZ ZZZZZ ZZZ O000 V) VD et r- et V) - NO 'I d' Cl V) NV) V1 N V0V00 1.� O e. 00 V0 et N C\ L--- V) et on M M et VO 00 .-. et 00 M 00 d' --+ W U Eli fl - 0000 OOOCO 0 -- N Cg .T. E-+ NMct V) �0N00g C Nen V1 \DN00 � 0 ---- N M M M M M M en en M 4 d' 4 4 d' .1- cr d' d' d' WI V) V1 Z H [-- OMVD O' - d; V000 ONd; V000 ONeFVD [- 010N (3� N MMM en d d d d V1 V1 V) V1 Vi VO VO VD v6 v5 '.0N N aO O O O O O O C) O O O O O O O O O O O O O C) ✓ M M en M M M M M M M M en M M en M M M M en M M M M M 4 V) 1� O 'h 00 et O V- V) V1 V0 1� C M 1` M 00 ›, ++ 00e.et V- OM VOm r` d 00N '.0C)) 00 i NNvO N N NC\ Ce. M d int- 00 rn - NMgn '.0000\ ON M4n4o U H w 41 4% VD V0 VD VD VD VD VD VD V V N N N N N 00 00 00 00 00 C � I A 1 0 �4 W '.0C) e. N M NNNM 00 r` Or` VD N VDd" d' 00 V) V0 eh 0 M41 V0 V0 N 1` 0 d' N O VD Cl 00 M oo N V1 00 O N . . Qom) N 00010 N M Ti V) vD N 000001 C\ O O — -- ''-' NN r H P-( 4) ONet N CNe. enLns` 0\ .-• MWnN C NetMD00 0Nd' W WA W t' V1 cr cr d' cr e 41 41 41 41 VD VD V) VD O N N N N 00 00 00 O Trrtd' Tr Tr TrvTrTr crTrd' eh et cretctd' et ctd' ct � 1-4 A as ›. CTE_, ct a C 00NN •'" M Ncr d' 41 N0000 OOhN VON NN V1 r� O V1 C\ 00 Cl 00 N 00 00 0\ O O Cl O M V0 ^ .-r 01 0\ N OW W �0 ,C_::_,) -. 000 .- 0000 0 - - --• -. 00 -. -- -- 000 Z H '.000M O NG10ct et V1MNM ct00'. inN 0'. N 41 V) 0000 h N ,--, 0 0 0\ 0 0' 0 O O '-+ 000 00e-• y v5 ' to m6 VD l0 V) v5 V1 V1 vi V) V) V) VS v5 vD vD '.0 vO t0 vO M M en M M M M en M M M M M M M M M M M M M M N .-a NV00\ CN 0000 V) 1D1� O V100 V1 CN VO d' M -. d lam --• M V U bb pn pi et 'O V1 NO\ - M V000 ,, et V) V000 ted: Vs: 0'. -" Cl P., 7 b N Cl N N N N N M M M M d �1 �f �J V1 V1 V1 V \0 '.0 Fl M M M M M M M M en M M M men M M M M M M M M o ,r) {xx 0000 OOOOC 00000 OOo00 OOo � � +, 0000 00000 00 00 00000 000 U O O Vi O Vi O Vi O Vi O Vi O V) 0 Vi O Vi O V) O Vi C Vi P-i 23 in NC) N 41 l- 0N 41 VON V1 r- ON in l- 0 N 41 L"-- ' + z "cW 4-4 V1 V1 1) '.0 VD V) V- N N N 00 00 00 00 X 01 01 01 0 O O O 1YYaYYv O W A etd' d- �t � � d- 'I' d' d' ct � ctd' �r 'Tr crvWn Inulin gala ° o . II • 3333333 33333 33333 33333 a, r..._ 0C\ OMr• onN ,-+ O 'n 000\ x- •-• M ONOr- r- . a V) CN M \0 .-• Vld\ Md' ,--' WI r...: ON '' Mvt '0 r• NN '0 \0 W00 •--,. NNN MM (+) N ^ 0o0\ 00N \Ov 4mc4 O — NMd• v) \0 N000\ 0 — NMM d' v) \0N 000\ 0 H NN r• N r- r- C.- r` NN0000 0000000000 00000000 O\ O 0 N p 4--+ zz zzzzz zzzzz zzzzz zzzzz oO t-„, 'f• o 0\ v) 00 \D MONC\ o •-� or- ow rnoo 'norn hM�1 r• vn N ^' 0000\ N Ov) 0\ \D m •--. c o� o0 N \O 'nd: N W O d' v) \O r-4 0000 O\ -. Nmd' \0 00C ,.., M v7 r• C\ ,.., M vi md' 'r 0N000\ ,-' NMd' v1 \0000\ 0 ,--' NMvn '.0N vl in v) In In v) v) \O \D ‘c \o '0 '.0 '0 N r` r- r• r• r• r d' 'n \0 00 0\ o N M 'n \O 00 O . •-" m vl N O\ O N m v) r• bA (-- r' N N r-: 00 00 00 00 00 00 c\ Ori O\ of 0\ Or 0 0 0 0 0 o0 � .- 00066 06000 00000 � •, -. F,•i mm M M M M M M M M M M M M M M M M M M M M c4 d4 ,_, 0\ OOr, \D \0 \0 d.. .-. \p .-' \0N00 v) ,, NMoOM0\ 0 -, .0 6v. 6vi0 viCvi0'. 4 06cnNN N ' \OOv'i0\ Q) 000\ r-' N ' InN 000 •-a Nd' It) N000 •-, Md' \0N00 N U HCH N 0000 O\ O1 C\ Cr, C\ 0\ 0000 OOO •-' ,-' ,-' •-" " — .--i ,.. .-' .--, ,-. .--i .-' ,-. . . . . . H O Q W a 0 < x O\ O • N NC> r` 'n •--' 0\ NM O\ NNON 00crNMO\ O U (-.H Mv) v1v1d; MN r• ,, Md; d v) v) 'nd, d; v) \Dr� N iN NN N N N N N NNNNN N N N N N N N N N N a N 1/4000 O N d' \000 C' Nd \000 ON d' \000 ON d• \000 +- W 4-' 00o0 O\ O\ 0\ 0\ 0\ 00000 •-' � � •--' ^ NNNNN C.) W /� d' d' d' d' d' d' d• v1 v) l n v) v7 vl Ul N v) v) v) v) v) v) N F1 i. Q +-' V E_, m W -r j dt N 0000 - It'. 00MM •-, N v) \ONv) M OO\ Od \0 ' v) O\ O 00 N \O r• 1/4.0 �' o0 \0 •--' 00 0O 0'.In N N OO N O\ O O W .17i O 00 -. 6666 ,-' dMN ' — 00000 — 0000 cA0 Z H .--' M \Orad' 00d _ r \0 \DN 00000cr \ON00000 b NN NNMMv) N \0 ,-' N \0 O) r+ v) In N x" 00000'. 00 \O \0 \Dvi, \O \O \O r- 000 ,, -' •-' NNN N N NNNN r. .--' .-. .--' .-- ,. - .--' ,-- NNN NNNNN NNNNN mm M M M M M M M M M M M M M M M M M M M M N C7 U d vr \oo\ � n o C'. o, \D � ror N r v) , NC' - bb M v) 00 O O N d; Cl t- M M v) \0 00 00 0 O\ \0 \O WI h- 426 a WI O V6 ',6 \O S N r` C": 61/4131/41:5V6 N \ '0 '.0 '.O N \O 'O '0 '.0 '0 '.0 , '.-' MM M M M M M M M M M M M M M M M M M M M M E""' T 00 In N __ � 3 0 (Af��.� Ix 00 00000 00000 00000 00000 < c) " ,.0§ r _ oo O0000 00000 00000 66606 QQ!� U 'O L< a N ON Ir- ONIn NON '0S vi ONInNO N 'ONON ] r: Q� (3� 4� -' .--' ,-' •--' NNN NMMMM d' d' d' d' Ul 'nv) v) \0 \D Pati O w I1 4n 4n 'n 'n Y) In In 'n v) vl vl 'n 'n 'n v) In v) 'n In vl vl v) PC1 �r ,(2s �^� 1-i IP • , 33333 33333 3333333333 . 3 00 q0 .-. .1. Tp MM V) d' M — d _' ", v1 O co vI M N O ,...1 V) , O v1 d: M N — O G\ 00 W d: ^, 0\ N d: N O 00 ' \0 W OO; Don vSyl 4 M -. 0orio0r d MN .-. o 00 [.., —, NNm4 vl '.0N000OO +-+ NM 4 v1 '.0NN 00 • Ey .< O, O\ 000 C\ O\ 000 OOOOO00000 O .-. .-. .--. .... ..-. .-. .--. .-. .� .--. .-. Q 0 N •p w 0 zzzzz zzzzz zzzzz zzzzz z 0ON NO r` � 000m � 00 v1 O NOCTSv1 N0001� v1 M000v1M NN 'ci: N ,-+ N Z O NO' O N d' '.0000ri --+ M viN000 N d' VOoOOco; h 00O\ ,--, N M d' v1V0co Co O ,, Cl d' v1 VD N 00O _ N N S 00 00 00 00 00 00 00 00 O\ O\ at O1 0'. O% ON O O O W o00+ � Nd: v1V0000\ 0 � Nd' nt0 N00\ � N M Wb ..�y O •- - -' - - - - - N NNNNN NNNMrm . . . . . .-. .. . ,.. r -+ .-, . .- .-. - M M M M M M M M M M M M M M M M M M M M m cn v1 •-+ '.0 — '.0 OIO 'n0 Inomr- -. NM0o0CN N ›-, O F-+ d' Oi M 00N 1-4 ,. u6dvl fid' ooN [- -. '--. vi N d) 0 ---' Md' '0 N01ONM d' '.0l 0'. 0 NMv11000 01 N NNNN N NNMMM MMMMd' d' 4 7t d' d' d' S-, I,, 0 Q V1 11 • F� 0 • Z d Md Orn '.0 v1N '.0 — N v1 '.0 MON Nto d '.000 Cl'. 0 • 0E-4 i 00010 ,--, M v1N. 000 ---, Mv100 +--. M in ,n , N O ..... ,-a N NNMMr1 mMM4d' d' +n v1 to vtv1v1 vi +.+ • [-( a N oNd' C000 ONd• V000 00 ONd' VD00 ON d' V000 O �,4 W 4-1 M M M M M d' d' t1 d' d' !n v1 vl v1 v1 In In In In In N 0W ^ v1 v1 v1 to v1 v1 v1 to v1 v1 to v1 v1 v1 v1 v1 v1 v1 v1 v1 v1 N Q C�y 000V0NVO NO - O � tn � tn00 -+ MvOON M "0 ',. ONa to d: l0Mv1K1 No0 '0d: N '000v1N Nmv1d: d: d: 0 O W 0 c 600; 66 O — 000 0000 '-+ i-, r ›, Q1.4 V] U Z (-4O ,4 O N ,-. No '.0 O41 .-. 00 d V0 00 Cl v1 d V0 v1 — 0 01 0\ 01 0\ 0\ 0� 0\ 0 0 0 O . N cn d: t: 0 M �O oo M N N N N N N N M M M M Cl'. M M Cl'. Cl'. d d d d v1 ,-tbb N N N N N N N N N N N N N N N N N N N N N Cl'. M M M M M M M M M Cl'. M M M M M M M M M Cl) N MM �t/-� N N 00 kr) v:)' O v1 v1 0' 0' N v 1 v1 N 0' N ,-+ *Tr VO N 00 F�+-1 `. 0 '0 d: Cr N --+ M M .--• N -' 0' t: 00 .-4 d: N O M N 00 a ti 's M M M M M M M M M M M M M M M M M M M M Cl'. H zi 00 OI 00000 00000 0 0 0 0 0 00000 0 8H 0 0 0 0 0 O O O o 0 0 0 0 0 0 0 0 0 0 0 0 N CviCv10 vivivi ovC iovio viviovi O U Oi < (�A-, oo un v1 NONv1C` ONINO Nv1NON v1 �w V0 \0 N N N N00000000 CN O0'. C\ O OOO r-. -, -, a Q) O to v1 v1 v1 v1 to v1 v1 v1 v1 v1 to v1 vl '.O '.O o � 'O '0 00 Grl � a �° F-I r , • • , • 3333 33333 33333 33333 333 n N Nm 0001mNN m010011- 'OCt0NN 001Om W W Men 0N 01DNNN N --, 100101 N -. 41000 NCt10 r.: v6 Ct Cn N00ir-: VD cM Clod \O v1 m +-+ O 0010 Ch Q E.. 010 — N m � CtV> >D N0001010 ,-, NMd' In v1V) C` E-( � e+ � -- -* CNNNNN NNN .-, . -, ,- ,. ,, ,, ,-4 .--, ,,-.. .... ,-. .... ... .-. p a.) 4-1'yy-7t ZZZZ 2ZZZZ 2ZZZZ ZZ ZZZ Z2Z OOOton N000 Mm VD 1000SVD41 0- +, N N e0 VD 01 Zd: N ,--, N m 00 -' ID e0 NNt N +0 •-+ m v) 0\ cn 00m0A U o0 .- 71. h OMIGOM 1� OCtooN 10564o6M l.: N '0 on ken N 0'. 0 — n 411� 0001 — Nit 41 'D 00 0» N 0000 0 ,-, — ,-, .-, .-, ,-- N N N NN N N0101 ,-. .-. ., _ ,--. ... .,, .+ ,-, ,-, .-. +-, .--. .-- .-+ .-. .-. ..... ,-. ,--. .--, — Z 4ten N00 O. ,-. Nmd. vON000 ,-+ Nd, ten VD00 CA! ON dp cn M m M M Ct Ct d CY Ni Ct Ct v1 v1 v1 In v1 In V1 to '0 '0 "im m m m M m m m m m m M m m m m m m m m m m N 000N d; 00 v101 N; CN VI e0 0010 4Nr. . n4 '00001 ›, O ++ 0 0 1D ,-, r` Nr` on 00Ct6vi ,-, r` MO, vi 1- M01 a] 0 ,. cy4000 . 4vso001 ,--, NY 01 , W on N -. m ClN1' N0Nm a) V1 41 41 41 41 0 VO VD VO VD VD VO N N N N N rr 00 00 00 U F-+ `a-+ "-. .--. .-. .--i -. r.. .-. „. ,-. ,. ,. .--,. .� r, ,. -. .-. -. -. „. „. ,. V '--1 0 A C4 Ct g" '‹ Z N M 00 01 M M N N 10 N In 0 0 N M N M -' on N 00 0 0 U H NM0OM 00N 'OO' N a; 1D000101 001DCt ... � ca 0 d' tet' MM N N - OO 0100Nv0vi d mN -. ai 00N 'n C.) H W NNNN 000 0000 oco 0000 o00 00001 Om1001rn CA0000 OO +. U W A 41 V) v1 V1 In VI In V1 In VI V) 41 In 41 In 1D VD 10 1D 1D VD 10 A Cd W H -, 00 In .-I 10 41 In M O M 10 N O M O 00 01 In 01 NI- N 10 M 'LI .. 4 bb 'et m O d*. 01 00 O 00 v1 01 00 N 00 N M N Cl 0h 0\ 01 M N . 0 U' W ,� p e-* e. OO 0 — OO .., 0 .... .-. ,� OO 000 a A W C4 C7 d Z HO In v1 10 *GrN 01 In 00 N V7 ,-. o0 •-. 0 ,--, 00 In 00 ,-, In 3 bb \000 N Ct N O d. 1D N 01 „1 , 00 0 N In N O m In l: N 0 V) In 1D 10 1O N N N N N 00 00 00 00 01 01 Q\ 0 0 O O O r-� N N N N N N N N Cl N N Cl N N Cl N N M m on M on m m M M m m m m m m m cnM cn M M M M m cnm m N tiO UI-. 1... In 01 In 01 M Cl O 01 00 '.4. 1D N NI* N 00 CIn O N 01 Ct W U N In v1 0o O O N M N —00 00 N VD 01 N VI In N 00 00 0! AA try 0 00 00 00 00 0i 0i 0i 0i 01 01 0i O O O C ,--� +. +", e-, •-, ,-I e.1-..1 ', MMMm MMMMm MMCt44 44 Cts' ,:r n.' V Ct N Clobl Q ?-ii 0000 00000 00000 00000 000 � H �, 0000 00000 00000 00000 000 .- U 'O 00a 0 NONIn NONInN ONInNO N NON InN0 ,- ttt 4 QI W t11 ,--, NNN Nm MMM CtCt. Cf Ct In In InIn1D10 10VDN a 0 .fl W A 10 10 10 VD V) VD V) ID 1O 10 1D 10 VD VD 10 VO 1D 1D 1D 1D 1O ID • • 333333 _3 33333 33333 _ 3333 00 _ .-. O\ \D 0 0\ N N \0 I N vl N et M \O 00 In 00 C/D NCS 00 •--• NN - - .-+ OC\ o0N '0rt N ONet — N a W N O d\ t-: kr; M -. O\ vl M O 00 \O V N['_' a� O 00 V1 M 00 000Q O +--, NM Ml- vn 'O N N000\ 0 _ •-. NMdt rt E''' NN N M M M M M M M M M M M M et et et et et et et • �i-t z z z z z zzzzz z z z z z �-� F-+ F-. � 2 � zf-� F .4 F F. �i H F-+ H �-+ �-. r�i r�-a O O 000 \DMNen 00\ MOCT N0enO\ 0\ In VD e. C\ N d; O et 00 .-• of 00 00 0\ CT N \D 't — t M 0\ d; O\ N x U e. 46 O d' 0\ _M t� � °' .--, vl °' '0 0\ M \O O M on MM M en M et et et et 44 szt V'1 VNl vl Von I1 VI 41 41 � '0 V) .-. r. .-. r. r. .-. .. .-. .-. .-. r. r. .-. .--. .-. r. .--. .-. r. .--. .-i .--1 Z Md' v1N000\ O r. NMd; v) VDN000\ O •-+ Nenen (Sa by v5 v v5 v5 v5 O N t-: r- 1-: t- t- c-: 1-: N N OO 00 00 00 00 00 .-. -. -. .-. -. .-. -. .. r. r. .r. r. v...1 r. - ... r. 1-. .-. r. 1-.'n' a MM M M M M M M M M M M M M M M M M M M M M w N . (1 M M N r• 0 00 vl M Ol vl O In O et N O N cr In h i 0 ,.-. \D N 00 ct O \0 N N M O\ 4 O \D --• t-4 N N M 00 M 00 M 0 vlt- 000NM Vl \0000\ r. on et \ON 0\ 0 NM Vl \D00 N 0000 of) 0\ O\ O\ O\ O\ O\ CSOO 0000 •-• •--. r .--. .-. > U C% -. e. r. r. ^ ^ — ,--4 ,-, ,--, NN NNNNN NNNNN 3-. 1..4 Q Con .--. CCS x N N 0 N O 0\ et M 0 00 M vl N M O\ 0\ 0\ In D M .0O r MT \OetM •• -0 , O� NNOeSO\ knr• ovl ..-. 0ir1p, � N O O 0o t` \D vi M N -� •-, O O O\ 00 00 00 t� N d \O 006MVl NO\ rMvN0\ rMd' \5006N4 4-, W4. _ NNNNNM ' 4 � ' 0 W - \O \O \O \O \D \0 \D \D \D \D \O \O \0 \D \O '0 \O \O \O \O \O Ni > Q Cd • -1-, U • • a IDA 00M 0\ vletet0\ OO \D -. \OvlN -1. c- N000 .-. d' T� 00 —, \D d. V'1 .-. 000 M ct N In N t`: O v? - O \0 * Vl O V• Y CO 00 ---, OO �-• O , 00 O 666 —. 6 O -. O — O Q � Z H 7t. v5Ch4lChChM — 0\ N O\ N N00 - 00 M \0 'et et 00 NN \O \O •n Vl \0 Ind, d. MN Nr" NN * --. ,-. ,-, N ,-, 66 66666 00000 66666 00000 F-. mm M M M M M M M M M M M M M M M M M M M M MM M M M M M M M M M M M M M M M M M M M M Nti) 0 U a Nvl MNO\ t+10\ vlvl \ON \D Nei- 1/4004D\D \0 -, ether "(� U bA NthMNON \O etNe. o0 \D LnM •... O' N \OetN0) 00 • C:1-4 N O O O O O O\ O\ O\ a\ O\ 00 00 00 00 00 t` 1-1 71-1. '' ct t 'eS' <t V' M M M M M M M M M M M M • O -t O ..0 x 0 0 00000 00000 00000 00000 "�" 00 00000 00000 00000 00000 lU vic5 vl O v1 O vi O •n O vl O V'l O vi O v7 O vl O V1 O U 'O Z Q+ 0 Nv1 IONvlh 0NInNO NInN0N vlN0Nv1 .�--. U < W 4-, NS N 00 00 00 00 01 0\ O\ O\ O 000 ,-, e. — N N N ��. N 0 HT1 r\ \D \D \D \D \D \D \D \D \D \o \D l� t t- t� tt- N l s h t- • • t 33333 33333 33333 33333 3 00 N N vl 4 V1 N N N ah 00 •--• '0 0 'O V1 N O Cr N M o\ a1 M N O N cr .1 V1 In In M a N M 00 N d: NO W vO e; -� 00 v0 M N a •-a00 Vis vO MOh MO v3 M a< V1 H tnlbhh00 0h00 •-• NNMd V1 V1 'ONN0000 a, L 1. d' C1- '71' t V1 V1 to V7 V1 V1 v1 V1 Vl to to to V7 VS V1 - - - - - .--. a a .-. a . . . . . - - - - - .-. Q N N 2 zzzzz zzzzz zzzzz zzzzz z O O 00.O oo M o N V1 � d' '.O %.0 ‘01-4M1-1 In 00 try V1 �. .-a 0,-1. 000 .-+ MN N V. N •--• a NMINO Mt� NNen a, w 0 vO0en v50 mh - V1 a, Mh .--a V10 d' 00MNN '0 ct 'ON 00O N4V1VO 00Cr •-.. N 4 V1 "0000) ,-., N VO l0 VO VO N N. N h N N' h h 00 00 00 00 00 00 00 0\ C) r-. r. .-. a .-. . . . . . .--i .-. r-. .-. ... . . . . . r. W [-"( to l) N 00 00 01 O a N M 4 V1 VO N 00 0\ O •- N M d- 14 ) 00 00 00 00 00 00 0< 01 O1 Ci ah 6< a< 0\ a\ 0) O 0 O6 O a .-. a .-. .-. .-. r. .-. .--. .-. -,...i . ,-..... .-. N N N N N ,.a M M M M M M M M M M M M M M M M M M M M M tnCI: MMM '1' 41 ‘..600 ,-.1 '1: hONN "h N0N4Vt CO Q .N 00 M 00 M 00 M 00 M06 d' a\ d' a1 v1 O to .--• vO -. vO ,4 4) 0\ - NCt V • l N000 ,--IM 't 0N - 0' . . N V1N00 O Q] N .-+ NNNN NNMMM MMMM *4 '1- 4 't4 '1' to a U <+-t NNNNN NNNNN NNNNN NNNNN N i. H O A r. Cti a O 1 'C Z et0000v) N - N000h ct en 0NtnM ON \OQN to 0' h d: •-a N N N N 'O O d; 00 Cl VD CN N V1 ON N •- U M -NN'0 0v0 Qvivl4 .I- mmN •-I O0) 0) 00N N H A- .y .0000N �t V000ON V t000ON 'd' 1/40N- Ch .---en Vt W ti--1 V1 ,,, ,..01/40 ,.0 '0 'O h h h hr-. 00W 00 0000000) 0) ON ✓ -p4 \0 \0 'O NO \O '0 \0 1/40 1/40 'O '0 '0 '.O 'O l0 '00 'O %O 'O ,0 N > I--� F-. Q 'd I W C4 0 '0 .-+ V1 -, NMMO Oao., d' d enIn h •d' V1 O 1--� N DN a) vD MN00N •7 O V� OO) M NOoO cr? 0 O WN .-. 0 a p .-. .-. ..-. .-. .-. N .-. O r. O .. .-. .-. .-. 0 a 0 o 0 , .00 Q C7 HN •--• N 'ct '' M d- Vl ,t M N N M In l0 N `-. OM a N :1 r .ct Vn C\ N '0 . V rI O N V11---- .1-. 0.: N r C) OC) C) C) - 4mene �t � - IiI1 '0 '0 '0 N . M M M M M mm M M M M M M M M M M M M M M M M N VD /-. .1- okOct •--, mm ,-+ 0h0 M ONM 'Oo) O\ CISN M W W U GJ) V1 ct h h •'-- M M t: 'O N O O .-• N - M M N M M c •O p. v1 N t4hNt� 00 000000000\ o: 0: a: a\ 0\ 0: 0\ 0. 010\ of 4 1J M M M M M M M M M M M M M M M M M M M M M u = 3 fA� o x x 0 0 0 0 0 0 0 0 0 0 0 0 o O x 0 0 0 0 0 � E{ ti,vfl00000 00000 00000 00000. O tri•O vi C0 vi O vi C vi C Vi O Vi C0 In O vi O vi o vi 0ZW NONVIN ONVINO N VV) nNON NON V1 N P - N N N N N NT.)ao - WA NN NNNNN NNNNN N • 40 3333 33333 33333 33333 . 333 00I, 0 mNI- 00 � v) NcnNdt ,-, 1- 0 M- 00 gym ,-, I 0001010 00O 00N v) MOM I� C, C110 Ch rl ,:r w .-- [Nm0 10NrM0� to .-. tM014Ovi 010 .--. H 0 0 ,--, N N on M ,et ,r vl 1D 1D t- t- 00 00 01 0 0 --„ E N V) V) W 1D 1D 1D VD 1D 1D 1D 1D 10 '.D 10 un ‘.0vDNN N N N .-. ,-. -. ,... . . . . . .-. .--. r. ". -. -. .-. .-. .-. .-. r+ 1 r. Q N N S. ZZZZ zzzzz zzzzz zzzzz zzz 0NN 001 v) C1v) 10 ,-, m0 ,-. 00 ,-, 0, O � 00 N ,--' NN ,-,..,• 0 v cl oo N N ,-. v) 00 ,.., cn v) 10 10 N 10 1 '0 V� 'eY M •-• o0 W 0 ,-, DO VI 01 d. Q ( N- � vn01MN ,-itoom N �- '( 00 0' v1N00 O1 ,-4N 'V' V) N0001 '-4N d' v) 100001 NM C\ O\ C101 010000 000 ,-+ x' ,-. ,-. ,-. ,-• -• NNN ,-. � .-+ .--. ,-, NNNN NNNNN NNNNN NNN Z an 'ON00 Q> CD. ,-, NM d; v) l0 \DN 000\ 0 N Md: d, • 't 0000 Or. ,- - - ,4 , „'"". .- ^' r" NNN NNN N N N N NNNNN NNNNN NNNNN N N N M M m c M m m M M M M M M M mm M M M M M M 6 ONc-n 'cr etcn ,, C1 NM01v) O d; 00Nv100 0 ,--. --, ,� O r. .p O vi 0 4 00 m t` - .664 . M .cr '0 NON10NM an '.80001 *--- NMv) '.000 01 ,-+ N O 0• N v1 un v) VI v1 VI 1D 10 10 10 10 1D 10 N r- N N t- N I- 00 00 U H (4-+ N N N N NNNNN NNNNN NNNNN N N N i1 1 Cl) 0 O W v) 10an -, 0\ CN . 01 NQ` N010 1DNmt- v1 00N00 O 0 V100NIN ,-, V- N01vn MO0' tit: 101010 ooON N vcr. --. t 'h MMNN NN ,-, gym vI � � ,_, M nNON1 a Qj N01 .-, m an NC1 m anNa\ +- W `.3-' 010100 000 ,x - ,-, ,- •-" NN NNNMm MMM O W ^ 'O '0 NN NNNNN NNNNN NNNNN N N N Q) I--1 . .r+ Q E"4 M FWi"7 -f d O cr O 01 -. 0 Nr- 0 m 01 M VO O1 00 MVD VD 00 V0 0 ,0 -1 r� 'K etvDvO OOOCr, v VD vn00 - N ,rd; ... M d. 01 Oh W 0 C' OO --. 6 6 .-„-- 00 0000 •-. 60 - d .- 000 r4 cn C7 Z Hoo ,-• C\ 0 NC1m0 — MNanan "tm 'ON ,C, -' CO bb M '1". M d; M ct v) V) N COON M v1 I� N O\ ,--' M M N I� N N N t` N N N N ( r4 00 00 00 00 00 00 00 a1 O\ O1 m M M m M M M M M M M M M M M M M M M M M M M M M M M M m M M M M M M M M M m M M M M M N 0 �t115 � I--- t` �D N CO M O\ .4. N O [r-, O an 00 N O N -. N O1 a -; M ., 00 00 v1 M ,-.. d\ 00 VD 47tM O O O 1D I; d, M ,-, 00 • f5• �, 740 Q O\ 00 00 00 00 00 06 I- t` N r` N N N N '0 .O 'D .6 '0 vi - m M M M M M M M M M M M M M M M M M M M M M H0 00 0 Aon N 0000^ N Q .� x 0000 00000 00000 00000 000 �, H 000. 0 00000 00000 00000 000 U O 6v, 0vi 0an0an0 viovioai ovi6vi6 viovi • N ONaN CN in NO NvnNON an NON an NON 0 ':41E44-1 CnW CI-.i 00000000 010101010 000 ,-.. ,-. -' ^ NNN NMm P- 0 W Q N N N N I� CN t� I- 00 0o 00 o0 00 00 00 00 00 00 00 00 00 00 mi..-- a ., , • S •r • 33 33333 33333 33333_ 33333 d' 0 Ort ,-+ N0 000' 'ONN OVOhC' 4DOenm a 41 \O \O WI 'Cr. Cl Cv 4D N 00 M 00 N N 0O O Cl N I W v$ •-+ -, 0 •--• '1 O un C\ 4 00 M h •--4 'D O c 00 N V1 O\ < N01 M '[t � rnrn 'D VDVDNN 00000\ 0\ 0 00 --, --+ —' H < V- V- NNNNN NNNNN hhhh00 0000000000 z -. ,-. --, .-, --, .-. .-. . . . . . ... --. ,-. .-. ,. ' ' .-. --, .-. ,.. Np 0 zz zzzzz zzzzz zzzzz zzzzz 0 ,n 00 O O\ er1 00 h 0\ M 0\ \O \O v1 d v1 .cM \D 0\ \0 M v1 ,-, 00 M O\ M h O M v) v1 v1 \0 00 ,--- v1 O \0 M •--, ,-- • Z O N \O O, M \OOcr1 t-: Oe ‘Li O\ Nvi00Nv1 O: cV \e. 64 v1 \:) N0\ ONM d \DhoO0\ -. NMv1 \D h0\ ONM •• N N N N N N N N N N N N N N N N N N N N N N W Ft 41 VD ho0Ch 00 +-- Ncnd. v? v? \Ot� oOO00 ,-• NM G N N N N N M M M M M M M M M M M M 4444 ,1- ; d' d' CtV z NN N N N N N N N N N N N N N N N N N N N N I !-1 - mm M M M M M M M M M M M M M M M M M M M M --+ 0 0\ N 0 \O -• eth010 ONm \000 d 00N \O O 00N v101e t- r6criN OM\ CO' N \G0\ N \00i N on \Oh0\ ON Md' VD C' — Ncnv1 \Oh O\ 0 ,--, N 1...,1 0000 0000000\ 0\ 0\ 0\ 0\ 0\ O\ 00000 000 ,-, — U H NN N N N N N N N N N N M M M M M M M M M M Q C/] r-. Cd a O Qt Z+ h ,-• . h \DONC NNh00\ , 0\ d. N0000 M 'd' 00 \000 rn 0\ Cl \O �-• \O ,-, o0 ' N -- O' 00 h v? NON \O N V N \O O H 0 N N M M44r vl vi \D h 0000 01 O -� N N M 'r vI v1 I .- un 0\ ,-, l h 0\ ,-, M v1 00 O N d' \O 00 O N t W �H . M h M kin' d' d' 'd' .1. 41 v1 vl vh h h h h 1 v1 \O \D \O \O o0 00 00 O WNN N N N N N NNSNN N N N N N N N N N N N (-) F-. ..•., • Q • "0 Win1-.1 -f NN ONCl NN00 \ONNNN •-• 000N O ct' 0\ o0N '0 P4 00M O O M M 00 '0 M - O\ M O N ,:f: \D \O 41: h -. O O .-, ,-. ,-. 0 .-. O .-i .-. O 0 N 0 '-. ,--, . . . . * O O '.° o QW C7 Z H --. 00 ON ^, � h �t' \O 'n000 NN0000en en NNO a72) , I.--, 0\ r, Mm �f N00000N d: N0 \D ,-, \D '-' 'ON 'O O\ O\ <3. 666. 600 C' ' . ' ,-, NCN cri c.i44witri M M M M M M M TI-1-1—:1-1- M M M M M M M M M M M M M M N kso '-. • N O\ \O 00 N • 00 C - M \p '0N �• \O h N M o0 h v1 •-,� MI 00:0 \Odt NO \O \0 —, Or- ,71-. N NO.: 000' N cn \000O ,1* 421,-.. ktiin � - MM M M M M MM MMMM MMM MMM MM M M 0 oo R3 0 _in N 44 • � Q ,, 00 P N 00 00000 OOOOO 00000 OOOO0 .< 9 '.2 w 00 QC' O O O 00000 00000 00000 U '� �j P-� 8 wIN ONb NO NInNON 'nNON (n SON 'nN ^i 8 ti ^ 0000 000 000 000 0000 000 000 000 0000 0000 0000 000 00 CO 000 000 000 000 0000 000 0000 0000 1a � o � � f-1 • o 33333 33333 33333 33333 3 r-• d' M00 *-• NO' OMd' etO\ ,C) .O0 000\ x--- VD ,.D O aCn 01MVDN� 00 Net •--• v) 00 OOO\ VON etm0NON 0' • W N O� N 0 .--•vi od' vO 09 •-, M d v5 00 0\ O O •-, O 0\ N N N M M M d d' d'E-Iv) I v) (n In •n k.D '.D '.O '.O v) 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 .--i .-. .--� .-. .-. .--. * .--, .--i .-, .--. .--i .-r .--i -.. _ ,--. .-. .-. .--i .-. O N p4°', zzzzz zzzzz zzzzz zzzzz z O 0 ,. v) MN N M 0' N d' ^' 0' VD d' N M O v) v) r-. 1/4000 O N M V) 01 M 00 M O N . M N- •-" d; V) N 00 00 0• ee N M • U OONv56tri c; 4 c Moo NNS •-. v) 0MND •- vOO d' d. '.ONQN0 •--• Md' '.ON� Q 0NMd- '.DN0TON M v) to vs v1 V) .rD V) %.C) VD1/40 '.O N N N N t N N 0000 00 NNNNN NNNNN NNNNN NNNNN N W H 4 '0 '.0N00 0\ ONM4 v1 'Ot` 000 •--. NM4k.O N . d' d d d d 4 vi vi vi vi vi v1 v) vl 6 vO v) vO 1D '.0 v0 "� NNNNN M M M M M M M M M M NNNNN M M M M NNNNN M M M M 1--1 „. '.D — NDN N- NN` Nv) '.O N. v? N N- •... MMN00 •-• (c."-.0 +- M vO O M N- O V 1-:- -. t N- O c+) 'D 00 *--• M vi N- 00 O y M d '.D N� 00 O +-• N dr •n '.000 0 0 . M d to %.o r- O0 co )� N . -' -• .--� .-+ NNNNN NN NMM MMMMM M U H �'}"� M M M M M M M M M M M M M M M M M M M M M N-. Iii O Q Cip .--4 d aM O < W v) 00d' N00 '.0O %.0 ‘.0d' 0 '.00' N0' N00 •-• •-• N d' O C H 0MVD000 Nd. d' lnN� omr- M00 '0400 '.O ,.,,f -4 N v3 5 l0 '.0 N . N- N� N� ti l` 00 00 00 0\ O\ 0 - -- M � on N '.) 000N d' '.0000Nd' '.D000N d' N0' �/ 4-+ 0000 07 0\ 0' 0\ 0\ 000 00 ,- ,-, ,--1• ^" *'• N N N N (� �'i W n NNNNN N N 0000 00 0000 00 00 00 00 00 00 00 00 00 N ✓ 1--I N-. Q d aVD 000 d N- d '0 ' 4 *, vs o0 <ct N vs N- M o0 d' 00 'ct ��T1� O .--. � NN N00NNN t- 0' .- 0\ '0 - 00v? MO 7 O 1+-V 71 0 •--- N •--' .--. .--. r. .-. N N — r. ,-- N •--• e-i M M M M V7 vi Q W Z Hv1Nd' 00g0 N m 0' 0 N . 000 N '0 M •nd- •-" d' 0 aM00M 00 V) MN� N v) •'-• QNd' - r. -. M V) N ON-v6 v3N� N� 00 060: 06 *-+ *-+ NNMd' •ON o0 ON -ciM M M mmmmm M M M M M M M M M M M M M N .-, UT-, a 000NO' N 00' v) VOvD Nd' •-^ N00 00 '4' 0\ 410 M .y V po 0 ad. N� 0\ 0\ •-+ Net N; '.Oo NO M '.O �n NN 'd; v) d; •n "C:),-. a , - M M M M M M M M M M M M M M M M M M M M M H •doo N �1 Md- Q • A ,.., 0000 a) Z 60000 00000 00000 00000 0 "U o F' y ovio (no •OOtOOtn Ov) OviC vOO 'OO •n O W y ON ''NNO Nv) 5ON •ONON v1 NON '0N 0 r .- 4a 0. 0,0,,, ,,, 000 ,* *-• •--- - NN N N MMM M d' a0 v0 000000000' 0, 0'. 0'. 0, 0' 0' 0, 0, rn 0\ 0'. 0'. C' 0' 0'. Ch I • 0 3333 33333 33333 33333 333 r• 00 01 .-• N d' Tt VO ,--. N et 01 00 O 00 41 ,-• M M P. COO vl ,t. 00 N N vn t, ,O -, -. O -• 00 M O ,O et N CN \O VD r, W 00 \6MO NMO\ vi -4 \O +-. \O '-4 \D N00cc; a; vl - oovi '` E.. vl vl 41 v1 .4 -t M M M N N - ,-. O O CA O\ 00 00 00 N 0.- E"1 .<H .< 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 V- N N N l- N N zr-. r. r. r-. r. .-. .-, r. .. r, .--� .-, ,, .-, ,-, ,, ,, r. ,. r. r. Q F-i O N p zzzz zzzzz zzzzz zzzzz zzz Q NNv1et N ,Oet ,00 CtN00 .4Kl 00 ,. t` t` \OMto }�i d. M Ch Cl MN co0 d. \O dt d. Nen et CT r-- 0-- •n N T. W O 00Nvi01 Nyi00 .-. \O •-+ NMO1v6 M000v6vi enN .--- 0000000000000000 OO\ Q\ 0O\ O C\ OO00 000 000 - rN" „T"' V0 N N N N N Cl N N N N N M on M M M M M M M M M o\ CNv. 01NO' ON et \0000N e1. NQ\ „-, M 11 VD CO vO N N 00 00 00 00 00 00 00 00 00 Ci O1 CN Cr, 0, 0 0 O 0 O rrr--+++ O N N N N N N N N N Cl N Cl N N N Cl N M M M M M M M M M M M M M en M M en M M M M M M M M M M N -. NNN MMNvoIn O\ NC\ Cr! N nMN Jnr eOO . O r~ T. T. 0 C1\ 00 r; N N 00 O; -~ en 06 In o\ en 00 ori 0) 0 - NM .1. 4Lin \Ot 000ONM .4 41N000\ eeNet H et et d' d' d' et et et et et et vl 41 WI kr) v1 01 41 `n VO VO 'O 0M en on M M M M M M M M M M M M M M M M M M M Cip 3.-( — 0 Q C4 al a x"-• ' d Net00 0N0In00 v1 \DCTC\ N NM4O, N Or~ 00 O U NO\ N ,O 0- N0001 T, MO 41C\ '- 0o .-. ,. 00 .1. 0\ NN . 11 v' d vi v6 N000\ OO 0\ oO \64M 000v1 T 00 4r•• 00 + E-41.."40) cr, r+ en vl l- 01 ,. et VO N O1 r. M 1n r- 00 O N M len N co U W W 4-1 Nen nen engin d' d"d' v1v1 .n 41 in OVOVD VO VO VO 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 •r, Q 0j 0 CCi a U - f .1 M Cl Ch WI 00 00 M M 01 O 41 C\ ,D 00 0 41 M 00 O N M \O "C" bQ 00 M N O N v1 M T. T. O 01 V1 00 M 01 M V) d. M 1/4O C\ N O 0 W NQ � l� vlvi N ,--- Nero O: �fNNvi v54004 oNvi 0 O > "CI r� P., CW C7 Z M 41 41 Ch MOM ,--• \O enNOO ,ON d' N \D „'" O 41000 N 00 r-. M 01 Cl d. O\ 00 M M 00 O M N v1 00 r, r. ._ ,, 1n 0 O\ 00 0) Tr. 01 VD \O CCNd 'vl \D \0 '.0N 00 N'.0 In V1 ,teMN � "ti"ti .. .-. .--i -. r, .-, -, ,-, -, -, -. ,, -, N q, .--IM (.. N v1 ,D vl M N .1. 00 -• l- N O M 0\ 00 00 In as Mn M 1 U d. 0' N0\ '.0 CD CT OOMOA - \) \Ov1N ,0 -. 441 *'fl P.1 to ,tMMCV NNc''.000 r+ NNN d vt � N0000 0\ 010 r ,. M M M M M M M en M d' d' rt ct d' et et et Tr et Tt .1. in E� ti o0 <4 O iZ; x 0000 00000 00000 00000 000 • 0 § E 4.., 0000 OOOOO OOOOO 00000 000 CI) vi 'fl 0 vi 0 vi 0 vi O v1 0 v1 0 vi O vi O vi O vi O � ' z <4W N NvlN0 Nv1t, ON nN0Nv1 N0NInN 0Nv1 P-1 o � WA `'�' o`t\ Q0\C\ rnrnrnOO\ rn rnrn0i0\ 0 or\ o°O, 0\ OO\ o�\ rnrnrn aa3a1-° • • 33 33333 33333 33 v1N O' OcC0 - NMV00' 0 VOIn (/) O - 00 'ctMCN '0 NvlNCN - - N • H r- r- VD VD VD VD N N N N N 00 00 00 F NN N N N N N N N N N N N NN .� r. .-. .. .-. v.. .-. .- .-. r. .-. z � q • zz zzzzz zzzzz zz , 0 . , C tC, OM �} m , , , Ngo ►r� M00 vnMNc0c0 ,tC\ Ol. C\ vlM Z U C) GT C' C' C' ' O Nd' 06 -, vi 6 v O .-+ m v7 S O\ N ch \C 00 .-gy m '000 NN NNNNe Mcntnd' 1- '.1' 71- mm .1. 71'MM M M M M M M M M M M mm Z H ON .1; tel N0 O� *-+ Nen '0 NC' - - - - ' - - N N N N N N N L mm M M M M M M M M M M mm ,---t=i mm M M M M M M M M M M mm O N00 v1NNNN NNC' N '0 O '-+ 1--) 00 ch .--i 00 cC ci M M 1- vi 00 O M vi N a 4) N l O, O N d• VO 00 0 N d N ON ,. O E44-4) ON MM M M M M M M M M M 00 00mM C4 s-i H O Q s" x NO' C' C' 'OMO Nl c0Md' ONvD Ovl 01NMm d - .0 ; 0 . " rh %CON ,. HF— MM MO' �h MN '1' 4'; ct -' S d H a CD 0 '-+ M 'TtcCN0' o .-, NcnM ',:r4p,/ (� t}4 NN SNNNl MMMMM MM U W /� 00 00 M M CO CO M 00 00 00 00 00 00 00 4) Q et � F a �1 f o - to N N �t kn m o, N N v1 MN mkt-) MN '0 - 0' V; 0C' IN00 ,1- (1O W cu l4 vi 0ov0Nr+ ,01- v6vDtnvl06 v6 CN e ›'' A C C' {7 (Ni M M Z Q Hits 00 .1. 00.10 + vl .--i cp d• d• m bb vlN Md. MNM M4 +--( NN MLS 1/40 d' N 001 00 m5 .4 cn c+1 M m5 M o 1� M-M M M M M M M en 0 M 4) U . vl N NN P cCONN 0 � .-. ` U bb �t vl � � r. cC r. 00 MC cC Vl VD 00 � y a' ' n miON 0 Q0 ► vl Cfvlvi CT C\i '0NN 0000 H 2 oo o ci c,, _ C � y Q 0 2 = 3 b 0 � O '�+ o0 00000 00000 00 0 `''U o +-� 00 00000 00000 00 F'' • vl0 vioviovi ovi0vio vl0 f'"., r� (4 Q+ 0) NO N vl N o N Sn 5 o N v1 NO up '- a' F{ < W4"4 ONO 000 ,-. -t - N N N NM Q, c) W Q CN CD 000 00000 00 Iil aa3a4: • 0 o Cr N CO w (NI U) i Z O — a) LU 0 0 - o C ® O-w -o 6 F--°-" I- u " T- - ' — ,-1 mo - O. M g ' Vto s Cr) (.9 $ i s ,s - os 0) 0 i 0 s - < -- N - O N -o - rn - o a -- -o - co -' 0 o .. O 4-1 v _ = F- a o w O Op - ow CL - (f) oO w w --o E ass 4 CD dI • O 0 L() t I N c1f4Z w ca pe - a Q00 co a ..O a) O Co O V 0) --o I0al OE aU 0 x _ +i wan i i i i i i i i i i i i i i i i � IIIIi i i i � Ni i i r -o i CO N `O O O 0 0 NOILYNI1DNI • • 0 o >•• (1:1 LLJ 0 , N > "•• 1-4 LLJ a _ -, , _ 0 • _ _ 0 a) Lu uj m --o 0 C ...... 1-1 "4. . v-i (V mi r 0 4• - a) OO 0 1._ 5 _.1 _ a. 1-4 U a -\414\ --a •• tn . . - Q,-1 ,..., . . ,-i 00 _ ca) 0 n - < < - o N -. _, , , -0 N 0 - al -- 0 o o - oo , 8 ........ - N I - 1- Cl. LU - go _ . .._. . , . , C:) a Ce D (I) - 0 < - 0 W 0 5 - 11) - 0 0 ,- ,.... .. .... -0 its - 't -V __ V) MI _ • --- 0 2 5 _.o• _ , , S us •5 - rn = o * _ • 0a• CO i --- 0 0) CD - • • _0 c 0- • 0 :Ej 0 0• -- N Li = (7) % - c F- 1-1 ..c MS _ ,...z...fn e • - o co . 0 • a .. -o • _ • (i) co , • - 1-1 La co -0 0 • _ • ........ , a) t - • o• TO -4 1• :L-3 13 i i 1 i 1 i I I I 1 I I I 0 na (u o o a) 0 0 o 0 0 o 0 0 0 0 0 0 1... a. o o o o o o o o o o o 0 0 0 0 o c- a u 0 ci c; cis c:3 ci ci ci ci ci ci c; cis c; 6 cz; x " :1:3 N 1- N 0 CO t0 Cr N 0 CO to •:1" N 0 Cel Cr) co N N N N N .--1 i-i 7-1 1-1 1-1 LU To 3 13- o co -I Hinwizv • • O [8H - ri LU 0 (n oZ 0 • - CD LU Q Cr) O (NiCD U - .-1N LD L. mp E 2. - M C7 - o O J ---- \\\\61 r -O r-1 O - N--I <• < n - ON -OO- C3l- O i .p- O- o O d-p- f� U- _ 1-- a- o WQf --0 01Yn - U) - 0 Wo 11 r , p Z - in - f0 _o - O V, 0 (0 - CIQ 2031p O 0 - a q % - Cr) CD - a IR -Q q • ii Z cn CO c0 CO -0 - O Q o 1a _O U = o 6▪1 � ' �9 - f0._. o i i i i i i i f i i 1 i 1 1 1 1 t 1 1 1 1 1 1 1 1 1 1 1 1 - 11 1 1 i i 1 I '1 0 x _ +� LU.— 00 0 0 0 0 0 0 0 0 0 0 0.- 00 o 0 0 0 0 0 0 0 0 al CO N t0 i.n d' M N .-1 (14) 1-Ild9a 1VDIflI A 0 • >. raw N '''' > - ra i1-4 LU J 0 0 0 O r-1 0 p In N W Z LU 0 fn LU M - C• 0 0 1- 0 N NI N r U .. jr,, CU -• Z CO _i Z EN U m (9 - O ,-I _.0 .-i O m 01 0 Q Q n N - 0 ., ., -0 Ln N 0 _O N ^ - U Z H I- ce 0 0 _o z ri o o Q _o .c • 0 0 0 L. 0 0)CO c 0 :n O. 0 = 0 a --- -o U f Ln C . _ 0 - • mz rn - rao � a;Q U s -0 r0 f 11- a o c i I I I 1 i 1 1 1 I I I I I I I S I I I I I I I I I I I 0.V 0 I I I I I I I I x _ ,� 0 0 0 0 0 0 0 0 0 0 w 0 0 0 0 0 000 f� 0J i I I I Ti Ti Ti Ti ri (4) JNIJS'd] • 0 o 0 . N L_ ;0 I__ • a) w _ 0 4-1 a 2 g 0 C a I- SI t —D 03.) (N < ri ,—I a) VD U '' 0 0 0 _ _._ in U • • ,,,a,--• • . co 0 •'IF • • -• , c• " in . ., , •_. , •• . •• i —o •,--1 ,--1 SD • 0 r-I co • - crl 0 • I 1,::•-•0--9 ., 0 is • n Y : 0 . ' • < < • • illr. SIP.s ..._., • arm • - 0 N 0;&we —CD cr) n• • • • ••••••- ir- alp__,.• -‘, 0 141 .__8 • ,„••4_ co w, . ••• fi - o C) ,--. r ' - •)0: CD-- ** qa.• •iri 6°- I— •. . ta. t# UJ - 0 0 Ire • ite to w ce 0%, p •• 0 0 a% - (f) < _:- o w g . 0 • • 0 • __ In • • _ • •• , s S . it • _ n3 _Ic or Aim_ .V. • — o tn •s. co 411A--- o < s dilatC,'• - d- 2 cm ei * — D • . o el - o o * - * o ---o cn co ; • c Efi- • in :r3 . • = 0 • Li }— Th" • ,ii C :_ • -- a 1-1 in _C 4:..— d 0 03 0 • NI 6 cn CO ii ft) 9 -o • ill --<--to2 « • 0 _c •• o c _ o TO I Eb- 1-1 • (13 r0 11 II 0 e A -a 0 0 S;LLJ3• 76 [ I III i III I 1 , II I Hi ! i IIII 1 I I i I I 1 1 III i I I 7 ID 1--)- 0 co v) V' N 0 co krIo • 'cl" N 0 CO —I y1 i—i r-i ,--I (1400-1/O@P) AIDAA3S 931SOC1 i • Survey QC - RGS-CT Specification Sheet gyr /data SURVEY QUALITY CONTROL-SPECIFICATION DATA PRE-30B CALIBRATION VERIFICATION CHECK(ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 64 272.50 53.91 0.00001335 -1.68 63 272.50 56.27 0.00001394 -1.87 62 225.09 355.21 0.00008879 -3.36 61 225.09 372.51 0.00009312 -3.74 60 43.64 323.00 0.00008077 2.03 59 43.64 314.18 0.00007856 1.48 58 0.01 -16.56 -0.00000418 -1.22 57 0.01 -15.78 -0.00000398 -2.51 56 330.04 -270.26 -0.00006789 0.32 55 330.03 -273.21 -0.00006863 0.05 54 299.00 -220.28 -0.00005480 -0.15 53 299.00 -219.05 -0.00005449 -0.66 52 269.72 76.05 0.00001884 -0.82 51 269.72 82.98 0.00002055 -1.30 50 239.53 335.97 0.00008360 -1.67 49 239.53 353.73 0.00008802 -1.76 48 210.01 316.17 0.00007941 -1.96 47 210.01 321.19 0.00008067 -2.16 46 180.41 72.92 0.00001841 0.48 45 180.41 87.55 0.00002210 -0.07 44 148.78 -180.11 -0.00004523 4.29 43 148.78 -178.68 -0.00004488 4.73 42 119.83 -151.02 -0.00003758 6.52 41 119.83 -147.80 -0.00003678 6.54 40 88.50 143.40 0.00003552 5.07 39 88.50 153.79 0.00003809 4.79 38 58.94 348.37 0.00008670 2.15 37 58.94 332.93 0.00008286 2.18 36 29.07 253.13 0.00006359 1.23 35 29.07 260.89 0.00006554 1.93 34 359.78 -4.71 -0.00000119 -2.34 33 359.78 -2.87 -0.00000072 -2.39 32 269.80 71.73 0.00001777 -1.88 31 269.80 73.11 0.00001811 -0.89 30 225.26 340.12 0.00008501 -3.97 29 225.26 340.99 0.00008523 -4.33 28 43.21 289.08 0.00007229 1.51 27 43.21 287.14 0.00007181 1.90 26 2.60 2.78 0.00000070 -1.48 25 2.60 3.42 0.00000086 -2.08 24 331.00 -276.10 -0.00006937 -2.79 23 331.00 -278.11 -0.00006988 -1.30 22 301.56 -266.41 -0.00006632 -4.48 21 301.56 -262.25 -0.00006529 -5.52 20 272.26 42.61 0.00001055 -5.49 19 272.26 32.59 0.00000807 -4.67 18 241.25 313.48 0.00007797 -4.96 17 241.25 313.11 0.00007787 -4.03 16 212.46 299.16 0.00007508 -4.88 15 212.46 310.05 0.00007781 -5.69 14 181.69 81.18 0.00002049 -1.06 13 181.69 76.12 0.00001921 -2.93 12 150.21 -189.80 -0.00004769 0.73 11 150.21 -186.45 -0.00004685 -0.33 10 120.39 -177.00 -0.00004405 3.82 9 120.40 -167.31 -0.00004164 2.13 8 92.00 81.39 0.00002016 3.75 7 92.00 88.87 0.00002201 3.69 6 61.28 314.50 0.00007822 3.59 5 61.28 331.67 0.00008249 3.09 4 30.17 260.18 0.00006534 2.28 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 1 of 6 AK0815GCM162 • • Survey QC - RGS-CT Specification Sheet gyr /d ata 1 3 30.17 270.37 0.00006790 1.68 2 0.71 4.09 0.00000103 -1.27 1 0.71 2.57 0.00000065 -1.19 MBO = -0.07 Gravity Error= 83.76 Scale Factor Uncertainty = 0.00002090 Rate Error = -0.36 POST-30B CALIBRATION VERIFICATION CHECK(ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 14354 272.95 217.52 0.00005389 -2.58 14353 272.95 229.68 0.00005691 -2.85 14352 226.95 453.97 0.00011343 -2.20 14351 226.95 455.83 0.00011389 -2.08 14350 45.65 486.06 0.00012151 2.63 14349 45.65 475.28 0.00011881 2.33 14348 1.35 188.56 0.00004760 -1.19 14347 1.35 207.88 0.00005248 -1.20 14346 331.70 -86.83 -0.00002183 -1.83 14345 331.70 -81.52 -0.00002050 -2.43 14344 302.37 -86.27 -0.00002149 -2.13 114343 302.38 -78.26 -0.00001949 -2.90 14342 270.39 259.38 0.00006426 -0.57 14341 270.40 264.21 0.00006546 -1.67 14340 243.69 472.24 0.00011741 0.32 14339 243.69 477.76 0.00011879 0.56 14338 212.26 437.67 0.00010988 0.05 14337 212.26 440.08 0.00011048 0.15 14336 182.69 222.22 0.00005610 1.20 14335 182.69 229.24 0.00005787 0.36 14334 152.25 -39.07 -0.00000983 3.23 14333 152.25 -35.12 -0.00000883 2.92 14332 123.21 -30.39 -0.00000757 5.40 14331 123.21 -29.38 -0.00000732 5.92 14330 92.72 278.76 0.00006907 5.93 14329 92.72 283.19 0.00007017 5.70 14328 62.38 493.90 0.00012284 2.97 14327 62.38 495.66 0.00012328 3.44 14326 31.97 433.21 0.00010877 1.70 14325 31.97 443.24 0.00011129 1.52 14324 358.01 137.03 0.00003459 -0.85 14323 358.01 141.09 0.00003562. -0.32 14322 271.90 231.36 0.00005732 -4.02 14321 271.90 233.62 0.00005788 -4.01 14320 224.97 454.58 0.00011365 -9.84 14319 224.97 461.11 0.00011529 -11.75 14318 46.23 477.53 0.00011935 -1.28 14317 46.23 484.60 0.00012112 -1.62 14316 358.72 118.33 0.00002987 -2.75 14315 358.72 130.48 0.00003294 -2.19 14314 329.08 -137.47 -0.00003453 -0.19 14313 329.08 -131.33 -0.00003299 -1.48 14312 299.17 -64.51 -0.00001605 -1.19 14311 299.17 -60.69 -0.00001510 -1.54 14310 269.58 282.51 0.00006999 -3.14 14309 269.58 289.77 0.00007180 -4.00 14308 239.83 480.59 0.00011961 -4.78 14307 239.83 490.39 0.00012205 -5.01 14306 209.27 425.98 0.00010704 -2.65 14305 209.27 419.39 0.00010538 -3.38 14304 180.18 181.17 0.00004574 -0.59 14303 180.18 192.93 0.00004871 -0.39 14302 149.56 -53.40 -0.00001342 5.10 14301 149.56 -47.74 -0.00001200 4.45 14300 119.60 25.66 0.00000639 6.24 SURV-Q167(OPS SUR-MA-003) 19`h Nov 03/Rev 15 Page 2 of 6 AK0815GCM162 • • Survey QC - RGS-CT Specification Sheet gyro/data 14299 119.59 26.49 0.00000659 6.33 14298 90.32 351.20 0.00008703 4.80 14297 90.32 375.04 0.00009294 4.69 14296 58.86 542.95 0.00013519 0.73 14295 58.86 550.57 0.00013708 -0.09 14294 30.47 430.75 0.00010820 -2.43 14293 30.47 436.13 0,00010955 -1.85 14292 0.37 121.67 0.00003071 -3.41 14291 0.37 121.90 0.00003077 -2.73 MBO = -0.24 Gravity Error= 243.72 Scale Factor Uncertainty = 0.00006087 Rate Error= -0.35 INITIALISATION Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs(ERMeas-ERTheo) 130 12.25 297.97 0.0497 131 12.25 298.08 0.0429 132 12.25 297.89 0.0293 133 12.25 297.74 0.0164 134 12.25 298.13 0.0172 135 12.25 298.04 0.0009 Average 12.25 297.98 0.0261 Tolerance on Average* 0.0825 Standard Deviation 0.00 0.14 0.0182 Tolerance on St. Dev.** 0.10 0.20 0.0380 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance=TBA * Tolerance on Average of earth horizontal rate difference is given by (1/Cost)*4[(cosA*SinI*0.1)2+{1,082] °/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cosi)*J((CosA*SinI*0.1)2+(0.082/(n-1))J °/hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 644.65 4260.44 35.32 305.43 0.000 -0.001 0.000 0.002 2 1130.22 6500.17 40.58 329.21 -0.000 -0.000 -0.004 0.006 3 1494.57 9500.13 32.98 14.43 -0.005 0.005 -0.014 0.011 4 628.26 10321.70 83.15 0.73 0.002 -0.002 -0.004 0.004 5 985.20 9500.02 32.72 15.23 -0.004 0.004 0.004 -0.004 6 1623.10 7999.08 37.94 337.66 0.005 -0.007 0.004 -0.004 7 759.85 7449.49 38.70 332.75 -0.001 0.001 0.002 -0.003 8 1148.89 6499.75 40.87 328.97 0.002 -0.003 0.005 -0.006 9 1445.27 5199.73 37.31 316.17 0.002 -0.003 0.004 -0.005 10 1085.46 4259.45 35.85 305.11 -0.001 0.000 0.005 -0.006 11 1096.17 3294.84 12.53 297.48 -0.001 -0.000 0.001 -0.001 Average -0.000 -0.001 0.000 -0.001 Standard Deviation 0.003 0.003 0.006 0.005 Tolerance for both the Average and the Standard Deviation 0.0330/hr 0.033°/hr 0.0330/hr 0.033°/hr SURV-Qi67(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 3 of 6 AK0815GCM162 410 • Survey QC - RGS-CT Specification Sheet gy ..rOrjdata INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth I Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 100.00 0.16 0.10 0.07 311.34 254.61 56.73 200.00 0.25 0.23 0.02 182.54 223.19 -40.64 300.00 0.44 0.38 0.05 191.79 213.60 -21.81 400.00 0.47 0.55 -0.08 193.17 205.39 -12.23 500.00 0.46 0.51 -0.04 190.66 199.65 -8.99 600.00 0.49 0.43 0.06 199.11 195.22 3.89 700.00 0.49 0.41 0.08 180.86 174.83 6.04 800.00 0.42 0.41 0.01 150.22 150.69 -0.47 900.00 0.33 0.38 -0.05 148.51 138.54 9.97 1000.00 0.42 0.35 0.07 126.89 129.49 -2.61 1100.00 0.57 0.54 0.03 171.53 142.09 29.43 1200.00 0.77 0.77 0.01 165.46 159.04 6.42 1300.00 0.66 0.71 -0.06 173.17 159.62 13.55 1400.00 0.69 0.61 0.09 168.31 156.35 11.97 1500.00 0.62 0.50 0.12 149.71 162.94 -13.23 1600.00 0.49 0.39 0.10 153.85 171.32 -17.47 1700.00 0.45 0.53 -0.08 166.16 180.31 -14.15 1800.00 0.58 0.72 -0.13 173.38 189.49 -16.12 1900.00 0.64 0.72 -0.08 169.70 204.31 -34.61 2000.00 0.54 0.69 -0.14 213.85 220.30 -6.45 2100.00 0.74 0.86 -0.12 247.20 247.62 -0.42 2200.00 1.07 1.08 -0.01 280.10 277.47 2.63 2300.00 1.17 0.88 0.30 282.22 278.94 3.29 2400.00 0.65 0.59 0.06 274.94 274.99 -0.05 2500.00 0.56 0.57 -0.01 265.21 273.84 -8.63 2600.00 0.48 0.60 -0.12 259.76 273.19 -13.44 2700.00 1.76 1.18 0.57 136.94 213.53 -76.59 2800.00 1.94 1.87 0.07 134.34 143.41 -9.07 2900.00 0.29 0.76 -0.47 94.66 30.17 64.50 3000.00 3.63 3.62 0.01 330.04 335.49 -5.45 3100.00 6.90 6.87 0.02 320.98 322.67 -1.69 3200.00 9.83 10.11 -0.28 308.99 312.42 -3.44 3300.00 12.22 12.36 -0.15 298.79 299.31 -0.52 3400.00 14.33 14.49 -0.16 292.85 292.74 0.11 3500.00 16.79 16.95 -0.16 295.34 295.06 0.28 3600.00 18.74 18.91 -0.18 297.32 296.88 0.44 3700.00 20.90 21.08 -0.19 299.38 299.03 0.35 3800.00 23.22 23.42 -0.20 301.26 300.88 0.38 3900.00 25.81 26.00 -0.20 303.44 303.04 0.40 4000.00 28.01 28.22 -0.22 304.22 303.82 0.41 4100.00 30.92 31.14 -0.22 304.70 304.29 0.41 4200.00 33.62 33.83 -0.20 305.13 304.70 0.43 4300.00 36.55 36.74 -0.19 305.83 305.41 0.42 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 4 of 6 AK0815GCM162 • • /,, Survey QC - RGS-CT Specification Sheet gyro/ ata 4400.00 38.07 38.29 -0.21 307.47 307.08 0.39 4500.00 33.10 33.32 -0.22 314.51 314.10 0.42 4600.00 32.38 32.61 -0.22 316.98 316.60 0.38 4700.00 32.84 33.06 -0.22 316.19 315.77 0.42 4800.00 33.75 33.94 -0.19 316.17 315.70 0.47 4900.00 34.59 34.78 -0.19 316.25 315.79 0.46 5000.00 35.60 35.83 -0.23 316.26 315.87 0.39 5100.00 36.23 36.45 -0.22 316.39 316.01 0.38 5200.00 36.99 37.19 -0.20 316.53 316.13 0.39 5300.00 36.65 36.86 -0.22 318.86 318.46 0.40 5400.00 36.58 36.76 -0.18 322.13 321.64 0.49 5500.00 36.87 37.07 -0.21 322.94 322.52 0.42 5600.00 36.39 36.61 -0.22 323.11 322.67 0.44 5700.00 36.27 36.49 -0.22 323.07 322.70 0.37 5800.00 ' 36.23 36.46 -0.23 323.16 322.74 0.43 5900.00 36.01 36.22 -0.21 323.30 322.84 0.46 6000.00 36.09 36.28 -0.19 323.64 323.18 0.46 6100.00 37.27 37.46 -0.19 324.88 324.40 0.48 6200.00 38.41 38.61 -0.20 326.06 325.61 0.45 6300.00 38.98 39.21 -0.23 327.27 326.84 0.43 6400.00 39.80 39.99 -0.19 328.20 327.74 0.46 6500.00 40.58 40.76 -0.18 329.19 328.76 0.42 6600.00 41.47 41.64 -0.17 330.27 329.86 0.41 6700.00 41.84 42.04 -0.19 330.93 330.55 0.38 6800.00 41.10 41.34 -0.24 330.82 330.46 0.36 6900.00 40.34 40.55 -0.20 330.68 330.31 0.37 7000.00 39.54 39.78 -0.23 330.43 330.08 0.35 7100.00 38.80 39.01 -0.22 330.35 330.03 0.32 7200.00 38.14 38.34 -0.20 330.27 329.97 0.30 7300.00 37.36 37.57 -0.21 330.56 330.24 0.32 7400.00 38.25 38.41 -0.16 331.76 331.46 0.30 7500.00 39.11 39.29 -0.19 333.34 333.09 0.25 7600.00 39.11 39.33 -0.21 334.51 334.36 0.15 7700.00 39.17 39.41 -0.24 336.15 336.01 0.14 7800.00 39.36 39.59 -0.23 337.42 337.31 0.10 7900.00 38.71 38.93 -0.22 337.42 337.30 0.12 8000.00 37.84 38.05 -0.20 337,76 337.62 0.13 8100.00 37.24 37.49 -0.25 338.06 337.99 0.07 8200.00 36.55 36.81 -0.25 338.78 338.70 0.08 8300.00 35.97 36.26 -0.29 339.30 339.27 0.03 8400.00 35.32 35.60 -0.28 339.93 339.83 0.10 8500.00 34.48 34.75 -0.26 340.52 340.39 0.13 8600.00 33.27 33.58 -0.31 341.01 340.94 0.07 8700.00 33.68 33.95 -0.26 342.10 342.02 0.08 8800.00 34.49 34.77 -0.28 344.17 344.07 0.10 SURV-Q167(OPS SUR-MA-003) 19th Nov 03 Rev 15 Page 5 of 6 AK0815GCM162 4 / • • Survey QC - RGS-CT Specification Sheet gYNI ta M 8900.00 35.28 35.52 -0.24 346.08 345.98 0.10 9000.00 35.98 36.25 -0.27 348.36 348.31 0.05 9100.00 36.11 36.40 -0.28 350.80 350.74 0.06 9200.00 34.88 35.13 -0.25 352.94 352.81 0.13 9300.00 34.11 34.36 -0.25 357.21 357.05 0.16 9400.00 34.41 34.66 -0.25 4.70 4.45 0.24 9500.00 32.93 32.99 -0.06 13.9.0 14.31 -0.41 9600.00 36.42 36.20 0.23 16.90 16.87 0.03 9700.00 42.31 42.33 -0.02 16.43 16.48 -0.04 9800.00 46.67 46.70 -0.02 13.69 13.69 0.00 9900.00 49.13 49.14 -0.01 10.42 10.44 -0.02 10000.00 51.55 51.56 -0.01 4.77 4.77 -0.00 10100.00 55.63 55.62 0.01 358.29 358.24 0.06 10200.00 70.68 70.66 0.02 353.13 353.05 0.08 Average -0.1304 0.2651 Standard Deviation 0.1476 0.1834 Tolerance for both the Average and the Standard Casing 0.3° Casing 0.5° Deviation Drillpipe 0.30 Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV-Q167{OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 6 of 6 AK0815GCM162 r • 0 , , Survey QC - RGS-CT Analysis Sheet gyi'o1 Lata SURVEY QUALITY CONTROL- DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 10.00 Azimuth reference: Grid/True North TRUE NORTH Vertical reference: RKB/MSL/Other RKB I If other give details I TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 I TVD 10.00 Northings 0.00 Eastinqs 0.00 Latitude 70.2958 Az. Ref:Grid/True True Grid Corrected YIN? N Description I CALIBRATION I Tool Number I F0052 I Calibration Date 117 May 2014 I OPERATING TEMPERATURE Calibration range From 50.48 To 120,02 Gyro operating range From 67.52 To 94.34 I Spec'-Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When not possible input roll test data performed after return to base) Cal value Pre job offset Post job Abs dif,cal.post Abs dif.pre.post Spec' offset Accel Scale 0.000056 0.000021 0.000061 0.000061 0.000040 Cal/Post-0.00015 Mass Unbalance 0.53 -0.07 -0.24 0.24 0.17 Pre/Post-0.4°/hr INITIALISATION Depth(Approx) 3301.44 No of stns 6 Spec'-Min No. -6 Azimuth Mean 297.98 Std deviation 0.14 Spec'-Azi SD 0.2° Inclination Mean 12.25 Std deviation 0.00 Spec'-Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas-theor)) 10.03 Std deviation 0.02 Spec'- See Q167 DRIFT TUNE Residual x gyro bias Mean -0.001 Std dev' 0.003 Spec's- Mean and SD - 0.333°/hr Residual y gyro bias Mean -0.001 Std dev' 0.005 Spec's- Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 111.55 I Spec'-400°/sec IN/OUT COMPARISON(AZI' N/A IF INC' <15°) Inclination Difference Mean -0.13 Std dev' 0.15 Spec's-Casing 0.3°/Drill pipe 0.3° Azimuth Difference Mean 0.27 Std dev' 0.18 Spec's-Casing 0.5°/Drill pipe 0.75° Lateral Divergence/1000 2.84 Spec- 5.0/1000 Vertical Divergence/1000 1.31 Spec'-2.0/1000 DEPTH CONTROL Wireline Company Schlumberger I Line type 7/32" Encoder SF I Schlumberger Max Depth (TD) 10300.00 CCL Corrected No Zero Depth (Rig up) RKB @ 65.09 Rezero Depth 16ft Given pup joint depth NA Measured PJ NA Strech cor.At TD divided by TD/1000 1.165 Spec'- 1.5/1000 Dif. Between riqup and rezero depths divided by TD/1000 1.533 Spec'-2.0/1000 Dif, Between given and meas depth divided by meas/1000 NA Spec'-2.0/1000 SURV-Q165(OPS SUR-MA-010)22"d Jan 2004/Revision 20 Page 1 of 1 AKO815GCM162 • M S • • Survey QC - RGS-CT Acceptance Sheet gYiidta FIELD AND SURVEY INFORMATION Operator BPXA(Alaska) Field/Platform Wellhead Well Number C-08B Survey section From 0.00 ft. to 10300.00 ft. Date 20 Aug 2015 Gyrodata Job No AK0815GCM162 Gyrodata Surveyors Jason Knox Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey'Hot'section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken,parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q166(OPS SUR-MA-003)13th Nov 03/Revision 12 Page 1 of 1 AK0815GCM162 w ti pF Tye • ,e1/7,,v THE STATE Alaska Oil and Gas of J ( KAL Conservation Commission %Oh= -- 333 West Seventh Avenue OF w ti' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907 279 1433 ALASP Fax 907.276 7542 www.aogcc.alaska.gov John McMullen SCANNED Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 a05—. 0 I I Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-08B Sundry Number: 315-478 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, f / Cathy P. Foerster Chair DATED this F fray of August, 2015 Encl. n.„.i i,- Y`t^�T. i,Er T x .7-- STATE OF ALASKA �� ' �� ' ALASKA OIL AND GAS CONSERVATION COMI ON e /`; '`) APPLICATION FOR SUNDRY APPROVALS �' 'Ig `�S, 20 AAC 25.280 it) IS ��''� 1 Type of Request Abandon 0 Plug Perforations o Fracture Stimulate 0 Pull Tubing 0 r tt, iwaCvn 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Rednll p. Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name BP Exploration(Alaska),Inc 4 Current Well Class • 5 Permit to Drill Number: 205-011 • 3. Address P.O.Box 196612 Anchorage,AK Exploratory 0 Development lI 99519-6612Stratigraphic 0 Service ❑ 6. API Number 50-029-20129-02-00 7_ If perforating 8. Well Name and Number What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No 2 PBU C-08B • 9. Property Designation(Lease Number) 10 Field/Pools ADL 028305 • PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft) Total Depth TVD(ft) Effective Depth MD(ft) Effective Depth TVD(ft) Plugs(measured) Junk(measured) 14636 • 8960 ' 13158 9013 13158, 13170 Unknown Casing Length Size MD ND Burst Collapse Conductor 80' 20" 33'-113' 33'-113' 1530 520 Surface 2642' 13-3/8" 33'-2675' 33'-2675' 4930 2270/2670 Intermediate 8975' 11-3/4 x 10-3/4"x 9-5/8" 32'-9007' 32'-7955' Liner 1175' 7" 8409'-9584' 7461'-8431' 8160 7020 Liner 3928' 4-1/2" 9442'-13370' 8311'-9007' 8430 7500 Liner 1322' 2-7/8" 13314'-14636' 9008'-8960' 13450 13890 Perforation Depth MD(ft) Perforation Depth ND(ft) Tubing Size Tubing Grade Tubing MD(ft) 11731'-14603' • 9021'-8960' 4-1/2"12.6# L-80 30'-9442' Packers and SSSV Type 4-1/2"Baker SABL-3 Packer Packers and SSSV MD(ft)and ND(ft) 9396'/8273' 12 Attachments Descnption Summary of Proposal lI 13 Well Class after proposed work' BOP Sketch p Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development El ' Service 0 14.Estimated Date for Commencing Operations September 15,2015 15. Well Status after proposed work Oil 0 Gas 0 WDSPL 0 Suspended 0 ' 16 Verbal Approval Date WINJ 0 GINJ 0 WAG 0 Abandoned 0 Commission Representative Op Shutdown 0 GSTOR 0 SPLUG 0 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Raese,J Kyle Email John.raese@bp.com Printed Name John M ' Il= Title Engineering Team Leader Signature 4 Phone +1 907 564 4711 Date 8 6 /� COMMISSION USE ONLY Conditions of approval Notify Commission so that a representative may witness Sundry Number 16— (-1-) $ Plug Integnty 0 BOP Test 19 Mechanical Integrity Test ❑ Location Clearance 0 Otheri ,V1 P5/3 /S /5 p5!50pfe5f fn 35'00 p5/ ( 3 /� /1-vin t//a r p re ✓c-yr -1")--. 7‘.-1-$f ¢a 2 SG d p S i2 C2 /14 C 2 5-, /1Z- (L fl/tcr-1cz? p/vI p/acc r - e- ztCc.10prOVCd pr. Spacing Exception Required? Yes 0 No Id Subsequent/Form Required 10 - ¢0 / APPROVED BYTHE Approved by Y-r•�- COMMISSIONER COMMISSION Date _( _ S'-- 1 :-1/;---741j- e//i3 l�� 8 5 � yr /is//5 GINAL �gd/�QRI (7S 8 /s \ Submit Form and a) Q 0 o O o o o o 0 o N co v v o N M N- U 112 o 0 0 0 0 0 0 0 ° 0 M N C) 1� N- co co — c• in oax cCDCDDC.000000 00 M O ti O M N LO CO O CO a- - � COCDOa- rO ( ON- � OOo C70 H MMCODN � M _OCDa-CO 00 MMOMNN N- C CI) COD N. c N_ O 0�0 Fs) sN N N N (A V CO2 . . i . i . i I i m M M COD N co CO O_ O o COCDI CO CO CD M N N nr 00 "7 M CO C• V 3 O O DOp 0 0 O O O o0t0 - Z0? 00c0 � I Z Zzco C • � Nu? Li? *kZccoccooccoo .N N CO t` O O N k N ` - X O - _ CA a- CO Nr VO M N o\0 N N CO CO CO CO , I a- I's- N- s- I- O Cr) D) 4▪ co t 0)O CO O M CD CO DO) I- CO LO N - 0000DO 00C) CO - 6) M CI) s- r a CO r M r 0) J w w w w H I- Q Q Q Q 0)00000 UcjaW W W W W CLCLCLCLWWWZ zwwwwwwwm 0 u) u) Z Z Z Z J J J ' To: Alaska Oil & Gas Conservation Commission e '11/4 From: Kyle Raese ;wilt bJ CTD Engineer Date: August 4, 2015 Re: C-08B Sundry Approval Sundry approval is requested to plug the C-08B liner perforations as part of the drilling and completion of the proposed C-08C CTD sidetrack. History and current status: Parent well, C-08B, was completed in 2005 as a lateral extension out of the toe of C-08A. A slotted liner was run in Zone 1A/1 B. The initial oil rate was high but quickly dropped with increasing gas within a few months. In 2006 a plug was run to shut in the new slotted liner, returning production to the cycling parent well perfs in C-08A. The plug was pulled in April 2013 to test the toe which brought in an uncompetitive level of gas. In January 2015 a gas log showed no add perf potential and the plug was reset unsuccessfully. It was reset in March 2015 back to Zone 1A perfs of C-08A which are no longer competitive after ten additional years of cycling. The well has no remaining value and has been released for sidetrack. Proposed plan: Approval is requested to drill a CTD sidetrack lateral from well C-08B by the Nordic 1 Coiled Tubing Drilling rig on or around November 15, 2015. The C-08C sidetrack will perform a single-string exit through the existing 4-1/2" liner. Kick-off will occur in Zone 1A and target Zone 1A/1 B reserves. The proposed sidetrack is a —2,410' horizontal Ivishak Zone 1A/1 B producer which will access targets north of C-Pad. The lateral will be completed with a 3-1/2" x 3-1/4" x 2-7/8" L-80 liner which will be cemented and perforated. This Sundry covers plugging the existing C-08B perforations via the C-08C liner cement job or liner top packer (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. w / " C / ffTc S it'e� x/ -e pock he o e� l �D �Q�� . w�r� f to rtrr� I,' t� ©� ra Te ®� / /^ Qs�a 70 ,1 cis;_. �.���t��n aPQ�i°r GDR r � l P rlv i 74,c for fedr`(l "kW, a//c ✓ l '')"'"C" Pre-Rig Work(scheduled to begin September 15, 2015) 1. E Gyro survey. 2. F NEL: Load tubing. 3. V Set TWC. Pre-CTD tree work. Rig Work(scheduled to begin November 15, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 1,538 psi). V 2. Pull TWC and kill well. 3. Set 4-1/2" monobore whipstock at-13,090' MD. 4. Mill 3.80"window and 10' of rathole. 5. Drill lateral: 4.25" OH, -2390' (12 deg DLS planned). 6. Run 3-1/2" x 3-1/4" x 2-7/8" L-80 liner leaving TOL at-11,000' MD. 7. Pump primary cement job: 34 bbls, 15.8 ppg Class G, TOC at-11,000' MD.* 8. Liner cleanout and GR/CCL log (if necessary). 9. Perform liner lap test. 10. Perforate -1000' liner based on log interpretation. 11. Set LTP (if necessary).* 12. Freeze protect well to 2,500'TVDss. 13. Set TWC; RDMO. Post-Rig Work 1. V Pull TWC. 2. S Set GLVs. 3. T Test separator. *Approved alternate plug placement per 20 AAC 25.112(i) Kyle Raese CTD Engineer 564-4629 CC: Well File Joe Lastufka THEE 6-3/8"CTN TY NOTES: WELL ANGLE>70•@ "'MAX v11�LI-EAD PtEVOY PROPl ED -OV ,LB;a: °@ '"'"DONOTTESTCSGOVER ACTUATOR AXELSON • - - 2500 PSI«" OK .ELEV 55.74' BF.ELEV= 35.34' 3000 13-3/8"CSG,68#, H 1653' r 142' H11-3/4"X 9-5/8'THER VIOCASE II KOP= ' Max Angle=_°@ XO TO 72#NJ 80 BATT 1900' H10-3/4"CSG X 9-5/8"CSG XO Datum MD= ' 10-3/4"CSG,45.5#, -I 1900'N ; 2056-n-19-5/8"FOC Datum D 8800'SS L-80,D=9.953" 13-3/8"CSG,72#,N-80,ID=12.347" -1 2092' J 2103' -9-5/8'PBR D=? l2112' H9-5/8'SEALASSY,D=? Minimum ID =2.377" @ ' I ® � 2126' H9-5/8"FCC 3-3/16" X 2-7/8" LNR XO —�� 2139' -14-1/T 0115 SSSVN,D=3.813' 9-5/8"FOC - 2647' — ' - GAS LFT MANDRELS 9-5/8"FCC --1 4203' -----"' - ST MD ND DEV TYPE VLV LATCH PORT DATE Iii3 4329 4226 37 TDP DMY RM 0 06/23/15 2 7509 6750 39 TDP DMY RM 0 06/23/15 1 8283 7359 36 TDP DMY RM 0 04/06/05 7'TBG STUB(XX/XX/XX) H 840T I---( I-I 8409' - 7"PBR D_? 8449' -I 9-5/8'X 7"LTP w/HGR D=? 9-5/8"CSG,47#,L-80,D=8.681' -I 8998' il L. I ' 9390' I-14-1/2'OTIS X Nom,D=3.813• • 9401' H 7"X 4-1/T BKR S-3 PKR,D=3.958" Eii ff---1 9425' -14-1/T OTIS X NIP,0=3.813' 4-1/2'1BG,12.6#,L-80 NSCT, -1 9448' M .0152 bpf,D=3.958• N1 -I4-1/2'OTIS XN ,MF ® LTO 3.80"(03/14/05) N 9448' -14-1/T WLEG,D=3.958' 7'X 4-1/2"TNVTEBACK SLV,D=5.282" -I 9448' - f 9457 -I ELK)u LOG??/??r?? 7"X4-1/2'TTN S-6 LTP,D=4.340' H 9458' 7'X 5'TTN LNR HGR,D=4.335" -I 9460' 7• MLLOUT WINDOW(C-08A)9584'-9634' 7'LNR,29#,N-80,.0371 bpf,0=6.184' -I 9584' A 2. TOP OF 3-1/2"X 3-1/4"X 2-7/8'LNR/CMT'D -11000 -11000 --13.70"BKR DERIOY SLV,D=3.00" 3-1/2'LNR,_#,L-80 SU,.0087 bpi,D=2.992' -13070 r 4-1/2"WHIPSTOCK w I RA TAG @ ' H -13090 il e 4-1/2'LNR 12.6#,L-80,.0152 bpf,D=3.958" 13090 0 y -13070 -13-1/2'X 3-3116"XO,D=2.786' I PERFORATION SUNNARY .j MLLOUT WINDOW(C-08C)13090'- ' REF LOG: ON XX/XX/15 ,i I ANGLE AT TOP PERF: °@ v, Note:Refer to lkoduction DB for historical pert data —{3 1/4"RA AAARKER JOINT w/PP TAG SIZE SRF MHZVAL Opn/Sqz SHOT SQZ V I -14400 -13-3/16"X 2-7/8"XO,ID=2.377" ., 4 Ni lil 3-1/4"LNR,6.6#,L-80 TCI,.0079 bpf,D=2.85' -I X14400 lib, Ig II R TD 2-7/8'LNR_#,L-80 STL,.0058 bpf,D=2.441' -I -16600 tl'. DATE REV BY COMlANTS DATE REV BY COMWBVTS PRUJHOE BAY UNIT 02/11/78 N-18E ORIGINAL COMPLETION WELL: C-08C 05107/95 D-14 SIDETRACK(C-08A) FERMI No: 04/01/05 NORDIC' CTD SIDETRACK(C-08B) AR No: 50-029-20129-03 XX/XX/15 CTD SIDETRACK(C-08C) SEC 19,T11 N,R14E,1666'FN..8 879'FEL 07128/15 PJC BUILD PROPOSAL BP Exploration(Alaska) TREE 6-3/8"CIV WB LFFAD IvIoEVOY C-O 8 BTY LE :208.4 @v 134 6' DO NOT TEST CSG07' OMAX E ACTUATOR AXELSON 2500 PSI,„ OKB.ELEV 55.74' BF.ELEV= 35.34' 13-3/8"CSG,68#, H 1653' r 142' H 11-3/4"X 9-5/8"THERMOCASE Max Angie= 95°@ 13130' XO TO 72#N 80 BUTT _ 1900' —110-3/4"CSG X 9-5/8"CSG XO Datum MD= 10631' 10-3/4"CSG,45.5#, H 1900' . 2056' H 9-5/8"FOC Datum TVD 8800'SS L-80,D=9.953" 13-3/8"CSG,72#,N-80,D=12.347' I 2092' 2103' 9-5/8"PBR,D=? L J 2112' —19-5/8"SEAL ASSY,D=? Minimum ID =2.377" a@ 13317' --------- _ 2126' H9-5/8"FOC 2-718" STL LNR PIN 2139' —14-1/2"OTIS SSSVN,D=3.813" 9-5/8"FOC —i 2647' 1— .... GAS LFT MANDRELS 9-5/8"FOC --I 4203' — — ST MD TVD DEV TY FE VLV LATCH PORT DATE Iii 3 4329 4226 37 TDP DMY RM 0 06/23/15 2 7509 6750 39 TDP DMY RM 0 06/23/15 1 8283 7359 36 TDP DMY RM 0 04/06/05 7"TBG STUB(XX/XX/XX) H 840T —I 8409 H 7"PBR D=? $449'' H 9-5/8"X 7"LW w/HGR D=? 9-5/8"CSG,47#,L-80,D=8.681" — 8998' .0 fff' ' ' 9390' —14-1/2"OTIS X NIP,D=3.813" g 9401' H7"X 4-1/2"BKR S-3 R(R,D=3.958' ' ' . - 9425' H4-1/2"OTIS X NP,D=3.813" 4-1/2"TBG,12.6#,L-80 NSCT, —{ 9448' ' ' 9438' H4-1/2"OTIS XN NP,13=3.80"(MLLE()03/14/05) .0152 bpf,D=3.958" r X 4-1/2"TIW TEBACK SLV,V=5.282' —{ 9448' 9448' H4-1/2"WLEG,D=3.958" 7"X 4-1/2"T1W S-6 LNR TOP PKR D=4.340' --I 9458' C 9457' H ELM)TT LOG??/??/?? 7"X 5"TNV LNR HGR,D=4.335' —I 9460' 7" MLLOUT WNDOW(C-08A)9584'-9634' 7"LNR,29#,N-80,.0371 bpf,D=6.184" —1 9584• 4111\* ? —FISH-2 RBR ELEMENTS 8 1 STIFFENNG RING TOP OF 2-7/8"LNR --I 13315' I 4-1/2"W-tPSTOCK(03/27/05)w/RA TAG©13381' —1 13370' 14-1/2"LNR D 12.6#,L-80,.0152 bpf, =3.958" — Violi13158' I —13370 J--I4-1/2"HES EVO TREVE PLUG(03/23/15) PERFORATION SUMMARY13170' —14-1Y2"BOT GBP(01/16/15) REF LOG: MWD/GR ON 04/29/95 13314' —13.70"DEPLOY SLV,D=3.00" ANGLE AT TOP PERF: 81°@ 11731' 13315' —13-1/2"X 2-7/8'XO,D=2.387" Note:Refer to Roduction 043 for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ MLLOUT WINDOW(C-08B) 13370'-13375' 2-3/4" 4 11731-11760 0 05/08/95 2-3/4" 4 11826-12206 0 05/08/95 2-3/4" 4 12260-12450 0 05/08/95 iiiiii 2-3/4" 4 12600-12622 0 05/08/95 ......;•_•,.., ` ` 2-3/4" 4 12622-13140 0 05/08/95 2-7/8"LNR,6.16#, L-80 STL, J 14634' 2-3/4" 4 13260-13377 C 05/08/95I SLOT 4 13316- 14603 C 03/31/05 .0058 bpf,D=2.441" ID(3.80"DIAMETER) 14636' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDI-OE BAY MT 02/11/78 N-18E ORIGINAL COMPLETION 07/28/15 PJC CSG/LNR/TBG-PRE RIG CLEANUP WELL: C-08B 05/07/95 D-14 SIDETRACK(C-08A) PERMIT No:'2050110 04/01/05 NORDIC CTD SIDETRACK(C-08B) All No: 50-029-20129-02 12/14/10 CSR/PJC PERF/LNR CORRECTIONS SEC 19,T11N,R14E, 1666'FNL&879'FEF 01/20/15 SRD/JMD SET BOT CUP(01/16/15) 03/23/15 RM-IIPJC SET EVO TF EVE RUG BP Exploration(Alaska) lel © III >• Mir moi_ _ a m E M v _$ f 5s Z 1 N 1 m 1 ' b fill: u g E s I 11 1 1 LL d $ _to = I Q rad a 1 , Q (41 I N o 0.1� $S 1 — IIS1 I : I „ --I ,11 I \ 111 11I O 111 O I N \ 1 p " _ // IL r I o \♦♦♦ n XC Z i I m S~ ® .w 111 4 III d Q > Offill 1 d P r > ir i 111 11 A J J ? =n in � MI6 it 2: N LL ,o N K , C w/ ; • 111 11O1CC .. II m ' : ° I J 1Wil ■ I o III re hi IP W 0. • • e Y ■ NIEE:= i O J. T N 11 U e 12 O g I 041J 1 `& !:J I I V a 1 ¢ • Q m' I �/ i1 N O{L g 1 1111111 0 <v O I I K K Z 8 a. i ' c N 4 0 I � m I w s ,„ • Y rc 9 mm i 1)11EIE� A1 �� m t ll4), n - Mm 1 ¢ pci IIA c c I 633 I ' 2 I EC A S_IIA�I i�11 ii i N_ I i Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" / boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. RECEIVED STATE OF ALASKA 3KA OIL AND GAS CONSERVATION COMA, MON APR 1 3 2015 REPORT OF SUNDRY WELL OPERATIONS 1, CC Operations Abandon LJ Repair Well H Plug Perforations H Perforate H Other 0)�P` , Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work 5.Permit to Drill Number Name BP Exploration(Alaska),Inc Development[] Exploratory ❑ 205-011-0 3 Address: P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20129-02-00 7 Property Designation(Lease Number) 8 Well Name and Number: ADL0028305 PBU C-08B 9.Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 14636 feet Plugs measured See Attachment feet true vertical 8980.27 feet Junk measured 13201 feet Effective Depth measured 13158 feet Packer measured See Attachment feet true vertical 9012 68 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 32 05-112.05 32 05-112 05 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11731-11760 feet 11826-12206 feet 12260-12450 feet 12600-12622 feet 12622-13140 feet 13260-13316 feet 13316-13377 feet 13377-14603 feet True Vertical depth 9021 44-9025 54 feet 9030 84-9023 04 feet 9023 4-9027 89 feet 9028 18-9026 85 feet 9026 85-9013 98 feet 9008.61 -9007 9 feet 9007.9-9007.3 feet 9007 3-8960 13 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#L-80 27 55-9440 26 27 55-8309 66 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary' Intervals treated(measured) 1 Treatment descriptions including volumes used and final pressure' SCANNED WAYv 1 2 2015 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 472 45263 28 0 1135 Subsequent to operation 655 36843 39 0 979 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory❑ Development❑' Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil Q Gas H WDSPI I GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact NitaSummerhays Email Nita.Summerha s• b..com Printed Name Ni - u erh- Title Petrotechnical Data Engineer _ �'' /F Signa--��.074 -4i. .AS,/ii - � Phone 564-4035 Date 4/13/2015 VTC 5-17-177't' RBDMO APR 1 8 2015 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028305 ACTIVITYDATE SUMMARY CTU#8 1.50"CV 24.1 bbls, Objective: Drift and Tag, Caliper, Set Evo- trieve. MIRU. Function test BOP's. RIH w/2.2"ctc, dfcv, disco, blank sub, 2" crossover, two 2" stingers, 2.12"crossover, 3.7" nozzle (oal= 13.46'). Tag CIBP at 13172' (up-wt). flag pipe and pooh. 3/22/2015 **job continued on WSR 03-23-15** Continued from WSR 03-22-15 CTU 8 Scope; Drift and Tag, Caliper, Set Evo-trieve. Pooh w/3.7" drift. RIH w/BHA; 2.2" ctc, dfcv, disco, blank sub, crossover, crossover, PDS GR, CCL, 2.75"calliper(oal= 22.39') Tag top of plug at 13179', pull up slack and wait for calliper to open, log up to 13080' paint flag, continue log to 9300' and POOH. Freeze protected well with 38 bbls 60/40 methanol. Downloaded data and -16' correction to Memory log dated 22-Apr-06. Corrected EOP 13051.05'. RIH it WFD mha 4.5"spear, HES downhole power unit, 4.5" evo-trieve plug, OAL 20.04'. EOP to top element 16.25' (left in hole top to top element 2.22', OAL left in hole 6.10') Timer to set plug 20:26. Positioned element to set at 13155', Top at 13152.78'-Bottom 13158.88', OAL 6.1'. after time was up . puh with clean pickup, RBIH and stack 2k DW on plug. looked good. pooh. tools look as expected. well freeze protected with 38 bbl's of 60/40 McOH.. 3/23/2015 **job complete** ** rig down continued on WSR 03-24-15** Continued from WSR 03-23-15. Performed weekly BOP test/rig down. 3/24/2015 ***End ticket/Job*** FLUIDS PUMPED BBLS 244 SLICK KCL 50.60/40 METH 294 TOTAL a) p_00000 © ommDoo co N CD N CD CD N C) coV - Lf) < O O LC) O r CD Lf) U 1) 0 0 0 0 0 o 0 E 5 0 0 0 LC) CO ''Zr CO CO VN- O C) CO CD CD CD CD CO 00 C Lf) co LO I� CD CO N LO N O — CD CD N N CO V N — LC) CO O V COr- O O V0) 6) - O LU CO O CO c) N O - N C) •4:1' O CA O CO CO CO N N- CO O) CO N CO H LC) LC) I� CO M 0 0 O) LC) N (7) Ln N 0 CD 0 '— CO N ai M N Vcoel O M CD N C osi in CD O V C) M L ' 0 0 O N N coM O M r O c O l(7 CDCD OM O) L N N (A (A r- NCt; 1.0 a 11111111111 6) C.) o E Q el Nr N O N ON Cr LON CO CO C5) (%J co M O c co CO CD N co N N CO O) • 3.1 CD Q O CD O0 0 0 0 0 0 O a) C Z Cp CO O Cb CO CD CO CO CO Z ZCO JZZ N = 4# *k *k Z N r �� L� V O U oln � Ln nNNCONwmN O O O O V co 4 L +� CO CO 0) — CO CO O ryiO CD CO O) CO N NCO O C CO CO CA CO Q) c co ma) a) M CO O 0) J CC H H QQ Q Q a)H 0 0 0 0 c U W W LU w W w V Z w w w w w W W w m O H H H H Z_ Z_ Z_ Z_ D D D U Z Z Z Z ci) H Packers and SSV's Attachment ADL0028305 SW Name Type MD TVD Depscription C-08B PACKER 9393.55 8270.82 4-1/2" Baker SABL-3 Packer C-08B PACKER 9450.56 8318.27 5" TIW S-6 Liner Top Packer C-08B 205-011-0 Plugs Attachement SW Name Date MD Description C-08B 1/17/2015 13170 4-1/2" BOT CIBP C-08B 3/23/2015 13158 4-1/2" HES EVO TRIEVE CRi — WBIOY C O 8 B �LFEAD= let � TY NOTES: WELL ANGLE>70'@ 10207'."' -ACTUATOR= AXELSON DO NOT TEST CSG OVER 2500 PSI"' CKB ELEV = 55.7' I BF. ELEV = 35.34' 13-318"CSG.68#, H 1653' Jam' 142' H11-3/4"X 9-5/8'TF6iM0f•ASE KOP= 3000' XO TO 72# - - 1,..„ --• 1900' --I 10-3/4'CSG X 9-5/8"CSG XO Max Angle= 95'@ 13130' Datum MD= 10631' 10-3/4'CSG,45.5#, - 1900' l'''''.- 2066' �9 5/8'FOC Datum ND= 8800'SS L-80,D=9.953' I� 2103' 9-5/8'PBR,D=? 13-3/8'CSG,72#,N-80,D=12.347' - 209? 2112' --I 9-5/8'SEAL ASSY,D=? 1 2128' -19-5/8-FOC CA I ( 2139' -4-1/2'OTIS SSSVN,D=3.813" 9-5/8'FOC -I 264r 9-5/8'FOC - 4203' — GAS LFT MANDREIS ST PAD, ND DB/ TYPE VLV LATCH PORT ()ATE Minimum ID =2.377" @ 13317' 3 43294226 37 TDP"DOME RM 16 04/06/05 2-7/8" STL LNR PIN LI I 2 7509 6750 39 TDP SO RM 20 04/06/05 4 1 8283 7359 36 TDP DRAY RM 0 04/06/05 7'TBG STUB(XX/XX/XX) -I 8407' l ' 8409' I7"PBR,D_ 8449' -9-5/8'X 7'LTP w/HGR D=? 9-5/8"CSG,47#,L-80,D=8.681" H 8998' k ' ' 9390' H4-1/2'OTIS X NIP,D=3.813' B pr---1 9401• -17"X 4-1/2'BKR S-3 FKR,D=3.958' ' - 9425' =4-1/2 OTIS X NP,D=3.813' ' 9436' H4-1/2.CITE XN NP,D=3.80"(MLLE )03/14/05) - 4-1/2"TBG, 12.6#,L-80,.0152 bpf,D=3.958' I 9448' 7"X 4-1/2'TIW TIEBACK SLV,D=5282' - 9448' 9448' H4-1/2'YVLEG,D=3.958' 7'X 4-1/2'TIW S-6 LNR TOP PKR D=4.340' --I 9458' /' 9457' -1111413 TT LOG??/fl/?? 7'X 5"TAN UR HGR,D=4.335' -I 9460" 7' MLLOUT WIDOW(C-08A)9584'-9634' 7'LNR,29#,N-80,.0371 bpf,ID=6.184' --I 9584' I—`.. 1 ? -FlSH-2 RBR ELEMENTS& 1 STIFFEMG RING 3-1/2"X 2-7/8"XO,D=2.377' --13315 - 4-1/2" 133154-1/2"M- STOCK(0327/05)w/RA TAG @ 13381' - 13370' 4-1/2'LNR, 12.6#,1-80,.0152 bpf,D=3.958' H -13370 13158' H4-12'HES EVO TREVE PLUG(03/23/15) PERFORATION— AR' 13170' --{4-1/7BO7PEW(01/16/15) RIF LOG: MWdGR ON 0429/95 ANGLE AT TOP PERF: 81'@ 11731' 13314' -13-1/2"DE34 oY SLV,D=3.00' Nate:Refer to P -oduction DB for historical perf data MLLOUT WINDOW(C-08B) 13370'- 13375' SIZE SPF INTERVAL Opn/Sgz SHOT SOiZ 2-3/4" 4 11731-11760 0 05/06/95 - _ 2-3/4' 4 11826-12206 0 05/06/95 - ` 2-3/4" 4 12260-12450 0 05/06/95 \ -_ _ 2-3/4" 4 12600-12622 0 05/06!95 2-3/4" 4 12622-13140 0 055/06/95 -_ ..... \ ove 2-3/4" 4 13260-13470 C 05/06/95 t'�♦1���AS4♦♦. 2-7/8'LNR,6.16# -I 14634' SLOT 4 13317-14603 C 03/31/05 L-80 STL,.0058 bpf, - - D=2.441' TD(3.80"DIAMETER) -I 14638' DATE REV BY COMFITS DATE REV BY OOMMB.ITS PRUDHOE BAY LW 02/11/78 ORIGINAL COMPLETION WILL: C-08B 05/07/96 RIG SIDETRACK(C-08A) FERMI No:12050110 04/01/05TkIOf IC 1 CTD"Er AR No: 50-029-20129-02 12/14/10 CSR/PJC PEW/LNR CORRECTIO.6 SEC 19,T11N,R14E,1666'FPL&879'FEL 01/20/15 Sf YJMD SET ESOT CIBP(01/16/15) 03/23/15 RM-VPJC SET EVO IHIEVE PLUG BP Exploration(Alaska) STATE OF ALASKA SKA OIL AND GAS CONSERVATION COM._ SION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon❑ Repair Well ❑ Plug Perforations 0 Perforate Other 0 Set CIBP Performed Alter Casing❑ Pull Tubing ❑ Stimulate-Frac ❑ Waiver]] Time Extension❑ Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended W❑ 2 Operator 4 Well Class Before Work 5.Permit to Drill Number. BP Exploration(Alaska),Inc Name Development 0 Exploratory 205-011-0 3 Address P O.Box 196612 Stratigraphic ❑ Service 6.API Number Anchorage,AK 99519-6612 50-029-20129-02-00 7 Property Designation(Lease Number) 8 Well Name and Number. ADL0028305 PBU C-08B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 14636 feet Plugs measured 13170 feetR E C E I V E D true vertical 8960 27 feet Junk measured 13201 feet FEB o 9 2015 Effective Depth measured 13170 feet Packer measured See Attachment feet b"1O�CC true vertical 9011 99 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 32.05-112 05 32 05-112 05 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11731-11760 feet 11826-12206 feet _ 12260-12450 feet 12600-12622 feet 12622-13140 feet 13260-13316 feet 13316-13377 feet 13377-14603 feet True Vertical depth 9021 44-9025 54 feet 9030.84-9023.04 feet 9023 4-9027 89 feet 9028 18-9026 85 feet 9026.85-9013 98 feet 9008 61-9007.9 feet 9007 9-9007 3 feet 9007 3-8960 13 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 27 55-9440 26 27 55-8309 66 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary. I Intervals treated(measured)- Treatment measured)Treatment descriptions including volumes used and final pressure SCANN O { i j j, (j .d;1,,, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation. 626 50159 62 20 1230 Subsequent to operation 864 48906 53 60 1167 14.Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil El Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt- N/A Contact Garry Catron Email Garrv.Catront BP.Com Printed Name Garry Catron / Title PDC PE Signature 1�� / Phone 564-4424 Date 2/5/2015 (� VTL Z//1/iS ill Z//2 4. Form 10-404 Revised 10/2012RB®MSA FEB O SAW Original Only Packers and SSV's Attachment ADL0028305 SW Name Type MD TVD Depscription C-08B PACKER 9393.55 8270.82 4-1/2" Baker SABL-3 Packer C-08B PACKER 9450.56 8318.27 5"TIW S-6 Liner Top Packer o, 0 0 0 O O O 0 M 0 N.0 00 N N- 0 N-- N- 0I)a co `c) a V 0 0 0 0 0 0 0 0 0 0 0 0 M N- u.f) N. N- CO M(—NI co co c a co co coCOCcoCOCoaoado %OcoTrcoo ON. (O O N Cf) N- O N- CO CO N N CO N 1f) CO O � ap � � O � OO � B O O - (OO � CATrOO) O (OOCNOM N N CO 0) CO O '- N CO Ln ON" O M V O O O O O N- CO 6 O) N- O O MNcoa % coaOM (OON N N. =CD Or _ TrO (00TrOO O r O L)CO co co CO CO Tr M M CO CO NT N N O) O) a- N CA ( en 2 Q M co M O O Tr Tr M M co coON Oco N ' NNCO0) , = O O 1- Q00 000 aOc9aOocoaoco - cocOCO = Nk � # Z (O (ONCON � 'N N NrO Nr `ro) T- CC) m co - r _ 00 000aN - - N -OD -GO O - N \ co co CV V N , MIA � � � � MMS O O O Ov. N M t •.r CO CO co co NrCA N-n.0O (OMO) CONN MO ; C CO -• CO C) CO '— O) M CO 0 Ji— CO — c') — a- 0) W W W W Q Q Q Q Ofd — — - CO0000 W W y V W W W W Z W W W W W W W W c E Q H H H H Z Z Z Z D D D UZZZZ J J :71 .JfnfAF- 0~p Y O a) °pas m U W o_ a) C is c a) o a)_, IL 0 c a) a) co co m N Y t 0_ C 3 -o L o N 0 U) O CO >> Y G_ o U H O 3 a) U) N N Q D 7 U U x o 0 I - 7:3- U) Z C o Q � s._- o C 0 3 cu C ) CU CO 2 `r ° 7 O .0 m a O vi m � x p -°od 3 � •0 92 � vi ° ° � � 't oai po t o `- 0- Cl)'`t - ' '`t O J C N 0 O V a) O U) U) Q) C-0) C C-•- N c U C. o C- -a C_ C C- Q p p Q � � p < r- -s < ca y < a> Q a) a) rn m o cc -0 E Z m m o ca m Q0 o m 2 m Cm L moo - m o CO a O •C��o ao m m a) op U � 'L U ,n � -co o U o U d U a U L O 3 �_ ) Q N (0 CO O C`7 - Q) U) . O '-- U) N N Q) U) O `t U) = m C6 co U) — U) L N N Q U) d a) U) O Cn I-- O Q� ° C E c 4- U ,. fn E (0 U (d O 0 3 0 -t = p L a p 0 O C C` a O O 0 �"� ai = ai Q > as -O O ai °) O a) U o as COCD > > � � H o > a) N � > _• -a o f > ca > 4(-7.5 � a)C c) • Q oC'-0 ° E a) -c a) a *ca 0 -0 o _s >M L QC N x Q ZT-CI e • oO ) OC0 * CO 0 * O C CO -p O * CQOg0 * N0n pOU) � 0 o C) ,noC cnLn _ U C- a) LU cu . -0 Cl) C 0 0C — 0 4 J Ch N r Ln in r CO -p 11 N U) O H 1— 0) O Q o N— O 7 Q CO (A 7_ CO C 7 O O O ,_ C = L O N N Q' O N N O .Q 0 N O N p O -c N "C-. II II C N > 11 U) O a Z II (n O E co O II U) .E C1 to II cL co - L Uo U = op C oo _o ooII � O L0 ° o p - o cU J - A) U J03 U N U L Yo , U)H NoL 3 ) U 9- m ' 09 C - ppQO adc - 4— ' 0 - - � - - - — QoCa) Co 0 cCCo- 0 CDm Z oo -v n 3' 1 -0 C D o O ° ° L .0 ` E ED - . 3 m ) z • 3Q • 3Z o Z m = cL caS (1) Lo 0pc ° a .c � a) ° a) wt .- 0E CO > ,0 % 2 .0 * C Q C bEC * CoC-D CoC 0 AF- 003t : C O d O OL * 0 * o C O * 0 * — co o_ O ov * U * - C l' U * p_ * Ude 4_ CQ 0 _J — L() Lo to Lf) Lf) LU N- c- ,- o O o O O O N N N N N N co in CON- N- CIVIFFLS C-08B — WELLHEAD= Nt;EVOY $. .Y NOTES: WELL ANGLE>TO"@ 1020T."` ACTUATOR= AXELSON DO NOT TEST CSG OVER 2500 PSI*** INITIAL KB.ELI 55.7' BF.ELEV= 35-34' 13-3/8"CSG,68#, H 1652' 142' 11-3/4'X 9-5/8-TFfRMOCASE I KOP= 3000' XO TO 72# 1900' 1—H 10-3/4"CSG X 9-5/8"CSG XO Max Angie= 95°@ 13130' Datum MD= 10631' 10.3/4"CSG,45.5#, H 1900' — 2056' —{9-5/8"FOC Datum ND= 880(7 SS L-80,D=9.953" L 13-3/8'CSG,72#,N-80,D=12.347' —{ 2092' r I 2103' —19-5/8"PBR D=? 2117 —19-5/8"SEAL ASSY,D=? ----1 Minimum ID =2.377" @ 13317' 2-7/8" STL LNR PIN r 2126' 9-5/8"FOC I 2139' H4-1/2"OTiS SSSVN,D=3.813" GAS LFT MANDRELS 9-5/8"FOC 2647' 1-+ ST MD TVD DEV TYPE VLV LATCH FORT DATE J — ^ — 3 4329 4226 37 TDP DONE RM 16 04/06/05 9-5/8"FOC I 4203' I 'L�I 2 7509 6750 39 TDP SO RM 20 04/06/05 1 8283 7359 36 TDP DMY RM 0 04/06/05 L—I. 8407' -17"TBG STUB 11 8409' 7'PER,D=? 8449' H9-5/8"X 7'LTP w/HGR,D=? 9-5/8"CSG,47#,L-80,D=8.681" —1 8998' 1-41 um I I 9390' H4-1/2 OTIS X NP,D=3.813" B X 9401" H7"X 4-112'BKR S-3 PKR,D=3.958" ' I 9425' —4-1/2"OTIS X NP,D=3.813" 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" H 944T 1 I 9436' --I4-1/2"OTIS XN NP,D=3.80"(MLLED 03/14/05) 7"X 4-1/2"11W TIEBACK SLV,D=5.282' H 8448' I- - / 44$'8 H4-1/2"WLEG,D=3.958' r X 4-1/2"71W S-6 LNR TOP PKR,D=4.340' H 9458' 9457' —aND Tr LOG??/??P? 7°X 5"TW LNR HGR,D=4.335' —{ 9460' a.......;, r FALLOUT WINDOW(C-08A)9584'-9634' 7"LNR,29#,N-80,.0371 bpf,D=6.184' H 85$4' 111N ? RSH-2 RBR ELBVENTS& PERFORATION StivIMARY I 1 STFFEIWG RING REF LOG: MAID/GR ON 04/29/95 ANGLE ATTOP FEW: 810 @ 11731' 13170' —14-1/2"BOTCBP(01/16/15) Note:Refer to Rod uction DB for historical perf data SIZE SPF _ INTERVAL Opn/Sqz SHOT SQZ SEE PAGE 2 FOR PERF 13314' H3-1/2"DEPLOY SLV,D=3.00" BREAKDOWN MLLOUT WINDOW(C-08B)13370'-13375' 3-1/2"X 2-7/8"XO,D=2.377' 13314' MECHANICAL WF-IPSTOCK(03/27/05) —{ 13370' — ---RA TAG H 13381' 41114--- --- , , —,, , ..... \ 4-1/2"LNR,12.6#,L-80,.0152 bpi,D=3.958" —1 1390$' .1...4...4, 2-7/8"LNR 6.16# H 14634' L-80 STL,.0058 bpf, D=2.441" TD(3.80"DIAMETER)H 14636' DATE REV BY COMNEYTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/11/78 ORIGINAL COMPLETION 08/04/07 OOB/SV CORRECTIONS WELL: C-08B 05/07/95 RIG SIDETRACK(C-08A) 09/01/07 LLVPJC SET WRP @ 13170' PERMIT No: 2050110 04/01/05 NORDIC 1 CTD"B" 12/14/10 CSR/PJC PERF/LNR CORRECTIONS API No: 50-029-20129-02 04/23/05 RMHrTLH GLV C/O(04/06/05) 05/02/13 TTR/JMD PULLED WRP(04/25/13) SEC 19,T11 N,R14E,1666'FM.&879'FEL 01/22/07 OOB/PJC DRLG DRAFT CORRECTIONS 01/20/15 SRD/JMD SET BOT CEP(01/16/15) 07/27/07 SPF/SV BP PULLED(06/25/07) BP Exploration(Alaska) . C -08B PERFORATIONS JI ? [ J 1- 1 I .1 .. lii PERFORATION SUINMIRY Fill LOG: MWD/GR ON 04/29/95 0"4 ANGLE AT TOP PERF: 81°@ 11731' 61 61 Note:Refer to Production DB for historical perf data INN. SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2-3/4" 4 11731-11760 0 05/06/95 2-3/4" 4 11826-12206 0 05/06/95 ' 2-3/4" 4 12260-12450 0 05/06/95 2-3/4" 4 12600-12622 0 05/06/95 2-3/4" 4 12622-13140 0 05/06/95 2-3/4" 4 13260-13470 C 05/06/95 SLOT 4 13317-14603 C 03/31/05 L IL , kii, - _ _ ....... -- __ _ ...... _ __ IhAttt DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UPR 02/11/78 ORIGINAL COMPLETION 08/04/07_OOB/SV CORRECTIONS WELL: C-08B 05107/95 RIG SIDETRACK(C-08A) 09/01/07 LLVPJC SET WRP @ 13170' FERMI No: 2050110 04101/05 NORDIC 1 CTD"B" _ 12/14/10 CSR/PJC PERF/LNR CORRECTIONS AR No: 50-029-20129-02 04/23/05 RMI-TLH'GLV C/O(04/06/05) 05/02/13 TTR/JMO PULLED WRP(04/25/13) SEC 19,T11 N,R14E,1666'FM_&879'Fa 01/22/07 00B/PJC DRLG DRAFT CORRECTIONS 01/20/15 SRD/JM O SET BOT CEP(01/16/15) 07/27/07 SPF/SV IBP PULLED(06/25/07) BP Exploration(Alaska) LOS-o'\ 2-5390 ,a` PRINT DISTRIBUTION LIST DATA LOGGED BAKER 2-Ay/2015 HUGHES M.K.BENDER COMPANY BP Exploration Alaska,Inc. INTERMEDIATE No FINAL Yes 1�EC E IV ED (mandatory) � v WELL NAME C-08B RUN NUMBER 1 (mandatory) FEB 09 2015 FIELD Prudhoe Bay Unit BH SALESMAN Henry Giordanelli (mandatory) (mandatory) �A A/�/� COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (�,/�(V1y(V�(V� (mandatory) (mandatory) STATE Alaska PAGE 1 OF 1 (mandatory) LOG DATE: January 15,2014 TODAYS DATE: 2/5/2015 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Henry Giordanelli (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#Or I NIN IS#OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 ConocoPhillips Alaska Inc. 2 1 1 1 Attn:Ricky Elgaricio A= C-08B_MRPM RAW_15JAN2015 BHI V2.meta ATOS-344 B= *(Folder 1 on cd/dvd) C-08B_MRPM RAW 15JAN2015 BHI_V2.meta 700GStreet C= **(Folder 2 on cd/dvd) C-08B_MRPM_RAW_15JAN2015_BHI_V2.PDF Anchorage,AK 99510 D= ***(Folder 3 on Cd/dvd) C-08B_MRPM_RAW_PASSO1UP_15JAN2015_BHI_V2.dlis C-08B MRPM RAW PASSO2UP 15JAN2015 BHI V2.dlis ****(Folder 4 on cd/dvd C-08B_MRPM_RAW_PASSO1 UP_15JAN2015_BHI_V2.1as C-08B_MRPM_RAW_PASSO2UP_15JAN2015_BH I_V2.las j * Folder 1 on cd/dvd needs to be named"META" ** Folder 2 on cd/dvd needs to be named"PDF" *** Folder 3 on cd/dvd needs to be named"DLIS" **** Folder 4 on cd/dvd needs to be named"LAS" 2 ExxonMobil,Alaska 1 I 1 1 I 1 I Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 State of Alaska-AOGCC 1 I 1 1 I 1 I Attn:Makana Bender 333 W.7th Ave,Suite 100 'Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 1 I 1 I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 I 1 TOTALS FOR THIS PAGE: 4 3 4 4 0 0 TOTALS FOR ALL PAGES: 4 3 4 4 0 0 SCANNED FEB 2 0 2015 · . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 05 - 0 1 ) _ Well History File Identifier Organizing (done) o Two-sided "11111111111111111 o Rescan Needed 1111111111111111111 RES CAN ~olor Items: ¢GreYSCale Items: \ \~ o Poor Quality Originals: DIGITAL DATA ~iskettes, No. ~ o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Other: OVERSIZED (Non-Scannable) o Logs of various kinds: NOTES: BY: ~ Date çj ~-¡ D 7 Date S f';g;/ b 7 o Other:: mf ,;111111111111111111 mf Sfo 151 BY: ~ Project Proofing Scanning Preparation I + ~fo = TOTAL PAGES (Count does not include cover sheet) 151 BY: Production Scanning 11111111111111 ,,11/ Stage 1 Page Count from Scanned File: 57 (Count does include cover sheet) Page Count Matches Number in Scanning Prjaration: V YES ~ Date:S/ ;)5/ D7 If NO in stage 1, page(s) discrepancies were found: YES NO ,~ rnp NO BY: Stage 1 BY: Maria Date: 151 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 111111111111111111I 10/6/2005 Well History File Cover Pé ge.doc STATE OF ALASKA AKA OIL AND GAS CONSERVATION COMIVDION cF .A`i` �� REPORT OF SUNDRY WELL OPERATIONS A GCC 1. Operations Abandon L] Repair Well L] Plug Perforations LJ Perforate LI Other IJ Pull Plug Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeII❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc • Development all . Exploratory ❑ 205 -011 -0 • 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20129 -02 -00 • 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028305 • PBU C -08B • 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL ' 11. Present Well Condition Summary: Total Depth measured 14636 feet • Plugs measured None feet true vertical 8960.27 feet Junk measured None feet Effective Depth measured 14636 feet' Packer measured See Attachment feet true vertical 8960.27 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 94# H-40 21 - 101 21 - 101 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11731 - 11760 feet 11826 - 12206 feet 12260 - 12450 feet 12600 - 12622 feet 12622 - 13140 feet 13260 - 13316 feet 13316 - 13377 feet 13377 - 14603 feet True Vertical depth 9021.44 - 9025.54 feet 9030.84 - 9023.04 feet 9023.4 - 9027.89 feet 9028.18 - 9026.85 feet 9026.85 - 9013.98 feet 9008.61 - 9007.9 feet 9007.9 - 9007.3 feet 9007.3 - 8960.13 feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 18 - 9448 18 - 8316.13 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: SCANNED JUN 18 2013 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 74 3798 15 0 263 Subsequent to operation: 930 38150 210 0 1042 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development IN • Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil o • Gas L] WDSPLLI GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summer Printed Name Nita Summerhay Title Petrotechnical Data Technician Signatur es .. j x ., 5 /v�,,,,,,._,/ Phone 564 -4035 Date 5/15/2013 VL lit3DMS i MAY 17 201 0 014 9 0`; Form 10-404 Revised 10/2012 Submit Original Only • • Daily Report of Well Operations ADL0028305 CTU #3w/ 1.75" CT (Cl V =33.1) MIRU from F -15. Standby for snow removal after Phz 2 mini blow. RIH w/ WFT 3.771" OD WRP drift BHA to tag at 13,149' CTM, weight up at 13,145' CTM. Flag pipe and POOH. 4/24/2013 ** *Job in progress. Continued on 04/25/13 WSR * ** CTU #3 w/ 1.75" CT (C1 V =33.1) POOH w/ WFT 3.771" OD WRP drift BHA. Tag at surface. Lay down drift assembly. MU 3 -5/8" Hyd G -Spear w/ 4 -1/2" WRP retrieval BHA. RIH and latch WRP at 13147'. POOH. FP well w/ 39bbls of 60/40 methanol. Confirmed WRP and all the elements were recovered. RDMO. 4/25/2013 ** *Job complete * ** FLUIDS PUMPED BBLS 107 METH 117 1% KCL 224 TOTAL Casing / Tubing Attachment ADL0028305 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 94# H -40 21 - 101 21 - 101 1530 520 LINER 1175 7" 29# N -80 8409 - 9584 7461.11 - 8430.85 8160 7020 LINER 3924 4 -1/2" 12.6# L -80 9448 - 13372 8316.13 - 9007.41 8430 7500 LINER 1322 2 -7/8" 6.16# L -80 13314 - 14636 9007.91 - 8960.27 13450 13890 PRODUCTION 1881 10 -3/4" 55.5# N -80 19 - 1900 19 - 1899.93 6450 4020 PRODUCTION 7098 9 -5/8" 47# L -80 1900 - 8998 1899.93 - 7947.64 6870 _ 4760 SURFACE 1632 13 -3/8" 68# N -80 20 - 1652 20 - 1651.95 5020 1140 • SURFACE 1010 13 -3/8" 72# N -80 1652 - 2662 1651.95 - 2661.87 4930 2670 TUBING 9430 4 -1/2" 12.6# L -80 18 - 9448 18 - 8316.13 8430 7500 • • • Packers and SSV's Attachment ADL0028305 SW Name Type MD TVD Depscription C -08B PACKER 8449 7428.83 7" BOT Packer C -08B PACKER 9401 8211.9 4 -1/2" Baker SABL -3 Packer C -08B PACKER 9458 8259.41 4 -1/2" TIW Top Packer CIW-FLS VYBJ_I-EAD = fit B/OY 11, C-08B AllY NOTES: WELL ANGLE > 70' fN 10207'. AeTLIATOR = *** T TEST CSG OVER 2500 PSI *** AXELSOPi iTitiAL ki. iii 50 I 147 1 X 9-5/8" T} I BF. ELEV = 35.34' 13-3/8" CSG, 684/, H 1652' 1- --...* KOP= 300(7 XO TO 728 .........„---. 1900' CSG X 9 CSG XO Max Angle = 95° @ 13130' -- 2066' 9 FFOG Datum MD = 1063 10-3/4" CSG, 45.5*. —1 1900' l''" Datum TVO= 8i300' SS , 1 - 00 . D = 0 ■ 1 (13-3/8» CSG, 72#, N-80, ID = 12.347" H 2092' j_ 2103' 1 FOR 0 =? 2.117 H9-5/8" SEAL ASSY, ID = ? I .: ___ Minimum ID = 2.377" @ 13317' 2126' 9-5/8" FOC 2-718" STL LNR PIN 0 • I 2139' H4-1/7 OTIS SSSVN, ID = 1813" 1 19-5/W FCC (H 2647' 1—' . GAS LIFT MAPERELS Ea AC TVD DEV CLAIM LATai FOR DATE 19 FOC H 1- ---.. ... 1 4329 4226 II TOP DOPE 131 16 04/06/05 4203' lipl 7509 6750 TOP SO FM 20 04/06/05 8283 • 7359 • TOP (W 134 0 04/06/05 840T 7' 186 STUB I 1 IL 8409" 7' PER, D = ? &SW H9-5/13 X 7' LIP w / HGR, D = ? I (9-5/8» CSG, 471, L-80, 0 = 8.681' H 8998' I ■ I I 1 9390' H4-1/2' OTIS X MP, 0 = 3.813" 1 g 9401' Hr X 4 MR S PKR,ID= 3.958" 1 1 I 1 9425' (— 4-1/7 OTIS X PtP, D = 3.813" . 1 I 8438• H4 OTIS XN Ma, ID= 3.80" (MLLE) 03/14/05) 1 1 4-1/716G, 12.61, L-80, .0152 bpf, ID = 1958" H 944T }-...... I I IT' X 4-1/7 TIW TIEBACK SLV, ID = 5287 1-1 9448' 1-- Ma' 1-14-1/r WLEG, D = 3.958" ...■ r X 4-1/7 TIW S LNR TOP PKR, ID = 4.340" H 9456' 1 I 1 sor Ha/443'n LOG 7909/27 I 7" X 5° TW LM R HGR, ID = 4.335' H 8460' "*".........--- 1 .........„...--- 7" MILLOUT WPDOW (C-08A) 9584'- 9634' I 1 7" LNR, 2911, N .0371 bpf, D = 6.184" H 9584' 1 a., FISH RBR ELEMENTS & FERFORATTON SUMMARY 1 STFFROIG RIC FIEF LOG: MAIYGR ON 04/29/95 ANGLE AT TOP PEFF: 81° @ 11731' Note: Refer to Roduction DB for historical pert data SIZE SFF INTERVAL Opn/Sqz SI-DT SQZ SEE PAGE 2 1 13314' H3-1/2' CLOY SLV, ID = 100'1 FOR FERF BREAKDOWN L 1 MLLOUT IMIDOW (C-0813) 13370' - 13375' (3-1/2" X 2 XO, ID = 2.377" H 13314' . INECHANICAL W-IPSTOCK (03/27/05) H 13370" -- -._ ...." -- -..... , I RA TAG I--1 X4:4:4:4: 1 4 LM, 12.61, L .0152 bpi, 0 = 3.958" H 13606' 2 LNR, 6.161 — 1 14634' L-80 STL, .0058 bpf, 0= 2.441" 1 TI) (3.80' ClAkETER) 14636' H 1 DATE REV BY COMENTS DATE REV BY COMENTS FRUCHOE BAY U'IT 02/11178 ORIGINAL COMPLETION 08/04/07 0013/SV ODRRECITONS KELL C-0813 05/07195 MG SIDETRACK (C-88A) 09/01/07 LLVPJC SET IARP ia 13170 PERO No: '050110 04/01/06 NORDIC 1 CTD - Eir 12/14/10 CSFYPJC FERN LNR CORRECTIONS AR Pb: 50-029-20129-02 04/23/05 7RMI11..H GLV 00 (04/06105) 05/02/13 TIMM PULLED WRP (04/25/13) SEC 19, T11N, R14E, 1666' FM_ & 879' FEL 01/22/07 00B/PJC DRLG DRAFT CORRECTIONS 07/27/07 SPFISV BP RILE) (06/25/07) BP Exploration (Alaska) • C -08B • PERFORATIONS • ).) [ C J g g 1433FORk11ON SIAMARY REF LOG: MWEYGR ON 04/29/95 4 ANGLE AT TOP PEW: 81 11731' Note: Refer to Ftoduction OB for historical perf data 41%" SIZE SPF INTERVAL ' Opn/Sgz SHOT SQZ 2 -3/4" 4 11731 -11760 0 05/06/95 2 -3/4" 4 11826 - 12206 0 05/06/95 23/4" 4 12260 - 12450 0 05/06/95 23/4" 4 12600 - 12622 0 05106/95 2-3/4' 4 12622 - 13140 0 05/06/95 2-3/4" 4 13260 - 13470 0 05/06/95 SLOT 4 13317 - 14603 SLID 03/31/05 DATE REV BY CONVENTS DATE REV BY C0M ENIS PRUDH0E BAY UNIT 02111/78 ORIGINAL COMPLETION 08/04/07 OOBISV CORRECTIONS V ELL: C-08B 05/07/95 RIG SIDETRACK (C -08A) 09/01/07 LLYPJC SET WRP @ 13170' FAT No: 2050110 04/01/05 NORDIC 1 CTD "B" 12/14/10 CSRIPJC PERF/ LNR CORRECTIONS AA No: 50-029-20129-02 04/23/05 RIN-ITLH GLV C/O (04/06/05) 05/02/13 TTR/JM) FULLED VVRP (04/25/13) SEC 19, T11P R14E, 1666' SNL & 87W VVEL 01/22/07 00B/PM DRLG DRAFT CORRECTIONS 07127 /07 SPF/SV _BP RILED (06/25/07) BP Exploration (Alaska) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 0 Anchorage, Alaska 99519 -6612 August 22 2011 y w ¢ a) SIP g i10 RECEIVED Mr. Tom Maunder AUG 31 Anil Alaska Oil and Gas Conservation Commission 333 West 7 Avenue 'lam Off & Ga C fflit, Com Anchorage, Alaska 99501 Anchar€,go Subject: Corrosion Inhibitor Treatments of GPB C- Pad 06 0 1 Dear Mr. Maunder, C 0 B Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) C -Pad 7/19/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010 C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010 C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010 C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010 C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010 C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010 C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010 C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010 C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010 C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010 C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010 C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010 C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010 C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010 C -168 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011 C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010 C -188 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010 C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010 C -20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010 C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010 C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010 C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011 C -24A 2040580 500292081601 Sealed NA NA NA NA NA C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010 C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010 C -27B 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010 C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010 C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011 C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010 C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010 C -32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010 C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010 C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010 C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010 C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010 C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010 C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010 C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010 C -41A 2041880 500292238501 Sealed NA NA NA NA NA C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010 • ~,~~,.F ~~ MICROFILMED 43/0'1 !2008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche~CvrP~s_Inserts\Microfilm Ma~er.doc • • WELL LOG TRANSMITTAL To: State of Alaska September 6, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99301 RE: MWD Formation Evaluation Logs : C-08B+PBI AK-MW-3615830 C-08B+PB1: Digital Log Images: 50-029-20129-02-71-00 c'' ~~~ NG'~1 ~ ~ 201 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Dater ~¢ ~I, ~a5 -v~~ BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~ IJ~~S ~ ~~ ~~ 09/28/07 Schlumb~rger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~~/3i+~~ ~o V ~ ® ZUU~ Well .leh tt I.nn nasrrinfinn N0.4440 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay na+p al rntnr rn 15-06A 11661158 MCNL ~# C 06/21/07 1 F-266 11216200 MCNL >+1. </ ~ 06106/06 1 P2-11A 11285926 MCNL ~ 04/19/06 1 1 C-31B 11745223 MCNL '-L/ 05/31/07 1 1 E-03A 11628773 MCNL bf 05/09/07 1 1 K-12A 11745224 MCNL p . ~ 06!02!07 1 1 18-10B 11485771 MCNL '4 / </`~-(0 11/08/06 1 1 C-08B 11209599 MCNL -() ~ ~ ! 5 04/22/06 1 1 D-306 11628774 MCNL L -~ 05110107 1 1 PLtASt AGKNVWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 } ^~+ 900 E, Benson Blvd. "''' "' Anchorage, Alaska 99508 Date Delivered: ~4`_s~ f °~ '~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received by: • ' ~ I'Itk'¢9l,;r;istkY IM~ DATA SUBMITTAL COMPLIANCE REPORT 5/2/2007 Permit to Drill 2050110 Well Name/No. PRUDHOE BAY UNIT C-08B MD 14636'/ TVD 8960'- Operator BP EXPLORATION (ALASKA) INC - 1 ). -r fVl~)....J.N l ~ 5>(> v.té- API No. 50-029-20129-02-00 Completion Date 4/1/2005 .--. Completion Status 1-01L REQUIRED INFORMATION _._~------_.~~ - .._---~-------~.._~_.~ Current Status 1-01L UIC N --~--~-~-- --~~-~--~---- --'--"-~---'-~"'-'----'--"-'--~-~-----~--'-~~----~'~---,~._-~.._,--,~~--'----".~-~-~-_._--~--~ -"----- Mud Log No --~-~~- DATA INFORMATION Types Electric or Other Logs Run: MWD GR / EWR Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name tfED- D Asê-~- Directional SurVey 09 D Asc Directional Survey }.¡log Injection Profile ~~E C Lis ED C Lis pt ~~ 14510 Gamma Ray 14516 Induction/Resistivity 14516 LIS Verification 1451. LIS Verification ._~ -~-~ Well Cores/Samples Information: Name Interval Start Stop ADDITIONAL INFORMRION Well Cored? Y ~ Chips Received? ~ Analysis Received? ~ --.- -------'._- Comments: -,~- -"-- Samples No Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint e Log Log Run Interval OH/ Scale Media No Start Stop CH Received Comments 13349 14636 Open 4/27/2005 IIFR l 13381 13510 Open 4/27/2005 IIFR PB 1 25 Blu 10410 13250 Open 8/23/2006 Mem Prod & Injec Profile, I Mem Lee Gr, CCL, Pres, Temp, Spin, 22-Apr-2006 i 13373 13510 Open 3/16/2007 PB 1 GR, ROP ~I 0 0 Open 3/16/2007 LIS Veri [0, B well aod PBt 13354 14636 Open 3/16/2007 LIS Veri GR, ROP P6 13354 13510 Open 3/16/2007 LIS Veri GR, ROP \. Sample Set Sent Received Number Comments e Daily History Received? cPN Formation Tops ~ Permit to Drill 2050110 MD 14636 TVD Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 5/2/2007 Well Name/No. PRUDHOE BAY UNIT C-08B Operator BP EXPLORATION (ALASKA) INC 8960 þjmPletion Date 4/1/2005 ~--~-_.._----~ Completion Status 1-01L Current Status 1-01L UIC N Date: ~ 3 ~ ~-:; API No. 50-029-20129-02-00 e e . . \VELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 February 6, 2007 RE: MWD Formation Evaluation Logs: C-08B + PB1, AK-MW-3615830 1 LDWG formatted CD rom with verification listing. API#: 50-029-20129-02, 70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNl1~G AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: ~ i·;/ ¡.'~. i U"t-¡! ~ ~,j ..... ~ . .1 Signed: (^~ JI,--- \./ ,øka Oii & Gas C¡if¡§. COO"~ ¿)Q6--0! ( ¡:t }£./5"16 RECEIVED Scblumberger AUG 2 3 2006 NO. 3929 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth -\Iaska Oil & Gas Cons. Commission Anchorage Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 !:)c5- -- () ,( Field: Prudhoe Bay WII J b# L D CI D BL C e 0 og escrlptlon ate o or D 07-34A N/A SENSA/MEMORY LDL 03/22/06 1 C-Q8B 11209599 MEM PROD & INJECT PROFILE 04/22/06 1 D.S.04-11A 11211384 INJECTION PROFILE 03/29/06 1 D-10 11258702 LDL 04/17/06 1 09-24 11217261 PROD PROFILE W/DEFT & GHOST 06/12/06 1 14-13 N/A INJECTION PROFILE 08/03/06 1 V-Q1 40010636 OH EDIT OF MWD/LWD 07/05/04 2 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth 08/16/06 . . Re: Aspen # 1 407 . . Hi Bill, Sorry to both you again, but when I prints but none of the description. Could you fax the drawing please. Thanks, Tom print your attachment the wellbore sketch ~aç-l\\ Bill Penrose wrote, On 6/23/2006 11:02 AM: Thanks for the catch, Tom. The 407 is correct and I've modified and attached a revised wellbore schematic. Regards, Bill Penrose Vice President / Drilling Manager Fairweather E&P Services, Inc. 2000 E. 88th Avenue, Suite 200 Anchorage, Alaska 99507 907-258-3446 -----Original Message----- From: Thomas Maunder [mailto:tom maunder@adrnin.state.ak.us] Sent: Friday, June 23, 2006 10:24 AM To: Bill Penrose Cc: dave roby Subject: Aspen #1 407 Bill, We have received (thanks) the completion report for the well. There is a discrepancy for the conductor and surface casing descriptions between what is listed on the 407 and the wellbore diagram. Could you check this. From what I can see in the file, the information on the 407 is correct and the drawing needs revision. Call or message with any questions. Torn Maunder, PE AOGCC 1 of 1 6/26/20067:37 AM .. STATE OF ALASKA A ALAS~IL AND GAS CONSERVATION CO~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil o Gas o Plugged o Abandoned o Suspended o WAG 1b. Well Class: 20AAC 25,105 20AAC 25,110 181 Development o Exploratory DGINJ DWINJ o WDSPL No. of Completions One Other o Stratigraphic o Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/1/2005 205-011 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 3/25/2005 50- 029-20129-02-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 3/31/2005 PBU C-08B 3614' NSL, 879' WEL, SEC. 19, T11N, R14E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 2848' NSL, 2037' WEL, SEC. 18, T11N, R14E, UM 65.09' Prudhoe Bay Field I Prudhoe Bay Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 3557' NSL, 140' EWL, SEC. 17, T11N, R14E, UM 14636 + 8960 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+ TVD) 16. Property Designation: Surface: x- 664509 y- 5959556 Zone- ASP4 14636 + 8960 Ft ADL 028305 ~~_. ------- 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 663236 y- 5964043 Zone- ASP4 Total Depth: x- 665394 y- 5964800 Zone- ASP4 (Nipple) 2139' MD .. -- - ----- - ---- - ----- .. - . . 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey 181 Yes DNo NIA MSL 1900' (Approx.) 21. Logs Run: MWD GR I EWR 2. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD . SETTING DEPTH TVD HOLE AMOU.NT SIZE WT. PER FT. GRADE Top BoTTOM Top I BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 100' Surface 100' 26" 173 sx Cement 13-3/8" 68# I 72# N-80 Surface 2662' Surface 2662' 18-1/2" 3839 sx Permafrost II 11-314" X 1o.3i4· X 9-!i8" 55.5# I 47# N-80 Surface 8998' Surface 7948' 12-1/4" 1200 sx Halliburton Lite, 200 sx 'G' 7" 29# N-80 8409' 9584' 7461' 8431' 8-1/2" 500sx Class 'G' 4-1/2" 12.6# L-80 9448' 13372' 8316' 9007' 6" 480 sx Class 'G' 3-1/2" x 2-7/8" 8.81#/6.16# L-80 13314' 14636' 9008' 8960' 3-/4" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. TUBING RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) 2-7/8" Slotted Section Existing from C-08A 4-1/2", 12.6#, L-80 9448' 9401' MD TVD MD TVD 13317' - 14603' 9008' - 8960' 11731' -11760' 25. ACID, FRACTURE, C¡:;MENT SQUEEZE, ETC. 11826' - 12206' 12260' - 12450' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12600' - 12622' 12622' -13140' 2100' Freeze Protected with MeOH 13260' - 13372' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 8, 2005 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BSL GAs-McF WATER-BSL CHOKE SIZE 1 GAS-OIL RATIO 4/19/2005 4 TEST PERIOD .. 452 3,080 3.5 96° 6,815 Flow Tubing Casing Pressure CALCULATED .. OIL -BSL GAs-McF WATER-BSL OIL GRAVITy-API (CORR) Press. 1,05C 52 24-HoUR RATE 2,712 18,479 21 26.6 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". .....; RECEIVED None ~n'\"¡';;-":f¡L'.' RBDMS BFl MAYO 3 2005 ~~~ APR 2 7 2.005 , ~IED _ .. .1._ n:1 o. t"ft^ f"nM r.ommissiOi1 ~F "IPin'" w' Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE Anchorage 28. GEOLOGIC MARKER 29. ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 1 B (from C-08A) 11498' 8983' None RECEIVED APR 2 7 2005 Alaska Oil & Gas Cons. Commission Anchorage 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble /'fá Title Technical Assistant Date (J.{ 1:;"'71 DS PBU C-08B Well Number 205-011 Permit No. / A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Terrie Hubb/e, 564-4628 Sean McLaughlin, 564-4387 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 1 0-407 Revised 12/2003 Submit Original Only Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 sp&9~g{~~~/1 0/1973 End: 4/2/2005 3/21/2005 10:00 - 11 :00 1.00 MOB P PRE Rig released from 02-26C @ 10:00Hrs on 3/21/2005. Prep to move rig off well. 11 :00 - 00:00 13.00 MOB N WAIT PRE Standby for Security. Doyon 15 is currently moving from Halliburton in Deadhorse to Kuparuk. Security will not allow the rigs to block 2 access roads. - Super-suck & cleanout solids in cuttings tank. - Inspected & greased injector. Changed out 2 cracked pins. 3/22/2005 00:00 - 11 :45 11.75 MOB N WAIT PRE Continue to wait for Doyon 15 to pass by K pad access road. Currently at CPS. GPB currently in Phase-1 weather conditions on all main roads & Phase-2 on all access roads & pads. - Adjusted magnetic pickup on powerpack tachometer. - Rebuilt counter wheel on injector. 11 :45 - 12:00 0.25 MOB N WAIT PRE Doyon 15 pass by K pad access road. Security ready for us. Held PJSM for moving rig off well. 12:00 - 15:00 3.00 MOB P PRE Jack-up & move rig to pad entrance. 15:00 - 15:30 0.50 MOB P PRE Conduct pre rig move safety meeting with rig team, security, and tool service. 15:30 - 16:30 1.00 MOB N WAIT PRE Wait for sand trucks and mats to return from Doyon 15 move. 16:30 - 00:00 7.50 MOB P PRE Move rig from 02-26 to C-08 (17.5 mile rig move). 3/23/2005 00:00 - 03:00 3.00 MOB P PRE Move rig to C pad. 03:00 - 06:00 3.00 MOB P PRE Move rig to C-08. 06:00 - 06:30 0.50 MOB P PRE Hold safety meeting for moving rig over well. - Well dead. 06:30 - 07:00 0.50 MOB P PRE Move rig over well. RIG ACCEPT TIME: 07:00 HRS 3/23/05 07:00 - 08:00 1.00 MOB P PRE MIRU - Spot cuttings box. - Enclose / steam cellar. - ND Tree cap. 08:00 - 09:00 1.00 MOB P PRE Nipple up BOP stack. 09:00 - 11 :00 2.00 MOB N WAIT PRE Wellhead only 10' tall, need spacer spool to reach BOP's. - BOP's lowered as much as possible, still 23" from well. - Well still secured. 11 :00 - 11 :30 0.50 MOB P PRE PJSM and Hazard Risk Assessment. 11 :30 - 13:30 2.00 MOB P PRE Nipple up spacer spool and BOPE. - Grease crew on location to service tree. 13:30 - 21 :30 8.00 BOPSU P PRE Test BOPE - 400 psi low / 3500 psi high (pipes/blinds/CTPO) - 250 psi low / 2500 psi high (bag) - Test waived by Chuck Sheive, AOGCC rep. - One failure: valve #11 Repaired and retested OK. 21 :30 - 00:00 2.50 CLEAN P WEXIT Change out packoff, MU coil connector. . Load and pump dart. 55 bbl coil volume. Test inner reel valve. 3/24/2005 00:00 - 00:30 0.50 CLEAN P WEXIT PU dummy whipstock assembly. 00:30 - 03:00 2.50 CLEAN P WEXIT RIH with dummy whipstock. 2.4 bpm at 470 psi. Set down at 13145, 13159,13201, 13242, 13262,2.7 bpm at 750 psi. 13275,13286,13326,13410,13440, 13490. continue in hole to 13507. 03:00 - 03:30 0.50 CLEAN P WEXIT Pump 55 bbl100K LSRV pill. PU to 13100. RIH to 13507 clean trip. Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Anchorage Spud Date: 9/10/1973 End: 4/2/2005 3/24/2005 03:30 - 07:00 3.50 CLEAN P WEXIT POH 07:00 - 08:00 1.00 WHIP P WEXIT Lay down WS dummy assy. PU WS assembly with 3 pip tags, orienter, GR/MWD, and FAIV. - Fill hole, took 4 bbls. 08:00 - 08:10 0.17 WHIP P WEXIT Verify hole not on vac. 08:10 - 11 :30 3.33 WHIP P WEXIT RIH with WS assembly. - Filling hole across the top. SHT at 3100' MD at 1.25 bpm /1300 psi. Cont RIH. 11 :30 - 13:30 2.00 WHIP P WEXIT Tie in / Orient. - 47k PU (pumps at 1.35 bpm) - Attepmt logging at 1.25 bpm. Tool not getting good signals. - Increase rate to 1.35 bpm (WS begins setting at 1.55 bpm). Signal recieved. - Orient TF to 40 deg LOHS with good signal. Decide to log while signal is good. - Log up, tie in to GR using PDS production log 8/21/95. - Correct +3'. · 19k SO (pumps at 1.35 bpm) - RIH to 13,475' MD. PU (46k) to 13,462.5' MD. · TF at 35 L. Get one click two clicks to 5R. - Increase pump rate to 2 bpm. Pressue stabilized at 3600 psi. (activating tool) · Bleed off pressure. - Pressure up to 1500 psi. Begin setting at 1100 psi. - Pressure up to shear off at 2900 psi. - Check tool face: 22 deg ROHS. - RIH, tag WS (3.5k down). 13:30 - 15:45 2.25 WHIP P WEXIT POOH. - Pumping minimum rate. 15:45 - 16:45 1.00 WHIP P WEXIT Blow back the reel (freeze protection during pill pumping). Lay down whipstock running BHA. 16:45 - 17:30 0.75 WHIP P WEXIT PU milling BHA. - Decision made not to pump CaC03 pill (hole stable, no losses). - Mill 3.8 no go, string mill 2.79 no go. 17:30 - 19:30 2.00 STWHIP P WEXIT RIH with milling BHA. 19:30 . 00:00 4.50 STWHIP P WEXIT TagWS and flag pipe. Pinch Point 13447.1 corrected to 13450. Mill at 2.66/2.7 bpm at 2450 psi FS= 2300psi - Swapped fluid to reconditioned flo pro prior to millng operations. 3/25/2005 00:00 - 04:00 4.00 STWHIP P WEXIT Continue milling window and 10' rat hole to 13467. Mill at 2.66/2.7 bpm at 2450 psi FS= 2300psi Bottom window called at 13457. No obvious indicators. Continue milling 13467. Slight ROP increase. Geo confirmed formation 20% of sample. 04:00 . 06:00 2.00 STWHIP P WEXIT Swap to new Flo Pro. Ream window. Dry tag, OK. 06:00·08:15 2.25 STWHIP P WEXIT POOH with window milling assy. 08:15·09:00 0.75 STWHIP P WEXIT LD milling BHA - Pilot mill: 3.8 go /3.79 no-go - String mill: 3.8 go /3.79 no-go 09:00 . 10:30 1.50 DRILL P PROD1 PU build BHA - 2.3 deg motor Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Anchorage Spud Date: 9/10/1973 End: 4/2/2005 3/25/2005 09:00 - 10:30 1.50 DRILL P PROD1 - DS49 re-run bit. 10:30 - 13:00 2.50 DRILL P PROD1 RIH with build BHA. - SHT at 3100' MD. - RIH through window to TD. - Tag bottom at 13,468' MD. 13:00 - 14:00 1.00 DRILL P PROD1 Orient to 25 deg ROHS. - Cannot orient in OH, PU through window to orient. 14:00 - 15:15 1.25 DRILL P PROD1 Drill ahead to 13,510' MD. - 2400 psi free spin - 2.6/2.6 bpm at 00 psi - PU 32k, SO 21k - Orient as required while drilling ahead. Last good toolface = 150 R. - Seeing some differential sticking while picking up off bottom. 15:15 - 15:30 0.25 DRILL P PROD1 Tie in to RA tag. - Theoretical RA tag at 13,458.6' MD. Logged RA tag at 13,458' MD. SD pumps to pull through window to tie in to formation above window. No go through window. No go up or down. 15:30 - 17:00 1 .50 DRI LL N STUC PROD1 Working pipe up/down pumps on/off. - Not able to orient. - Pump pressure at 2.6 bpm = 3400 psi. 17:00 - 22:00 5.00 DRILL N STUC PROD1 Waiting for crude truck to arrive on location. - Maintiaining down weight on coil (-2k coil wait). - No losses so far. - Crude truck arrived. Spot and hook up. - Failed vapor pressure test 2 psi versis max of 1.5 psi. Called second truck -Work pipe -13K to 44K previous PU 38K. -Attempt to orient OK got 90 degrees -Attempt to orient OK got 10 degrees - Attempt to orient OK got 35degrees to 41 L - Work pipe -10K to 44K - Orient with -13K shacked Oriented OK - Orient with 40K tension Oriented OK & work pipe. 22:00 - 23:00 1.00 DRILL N STUC PROD1 Conduct vapor pressure test on crude. .75 psi OK. Circulate 40 bbls crude downhole. 2.1 bpm @ 3800 psi. With 35 bbl out bit have crude in entire horizontal annulus and up to 45 degree inclination. Work pipe. -13K to 90K. NO GO. Pressure well to 400 psi. Work pipe bleed off. No Go. 23:00 - 23:45 0.75 DRILL N STUC PROD1 Drop disconnect ball and circulate to disconnect. Ball on seat with 44.8 bbl. Shear seat at 3100 psi. Top of Fish 13392'. 23:45 - 00:00 0.25 DRILL N STUC PROD1 POH. 3/26/2005 00:00 - 02:00 2.00 DRILL N STUC PROD1 POH. 2.85 bpm 1500 psi. chasing out crude oil pill. 02:00 - 03:00 1.00 FISH N STUC PROD1 MU Fishing BHA. 3" GS spear jars, collars, accelerators etc. 03:00 - 05:30 2.50 FISH N STUC PROD1 RIH 13300 05:30 - 08:00 2.50 FISH N STUC PROD1 Up Wt 40K, DN WT 20K. Tag fish at 13387. Latch on and jar fish. - Jar down 20K. Can feel the jars hit. - Jar DN 26K, 22 hits down. Jar up 10K over. Jar down, 21 hits. - Pump through jars. Jar down 10 licks. Jar up 10k over. Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Spud Date: 9/10/1973 End: 4/2/2005 STUC PROD1 - Jar down 10 licks (65 total), seeing some movement. - Jar down 8 more, increased movement. Jar up 10k over. Jar down 8 more. - Seeing movement, down I up (10k) / down combination (85 total). - Pump through jars. Jar down, have lost our movement. Down 8, up 1. - Jar 8 down, 1 up. Up / down (10k) combination hits. - Jars hitting soft, pipe at 38% coil life. 110 total hits. - Pump off fish. POOH. Lay down fishing BHA. Remove DS CTC. Cut 150' of coil. Install Baker CTC Pull test to 30k Pressure test to 3500 psi. MU fishing BHA with agitator, BHA #6. RIH with BHA #6 - Test agitator. - Pumping 0.5 bpm, 650 psi. Weight check: 39k PU; 17k SO. Tag fish at 13,383', stack to 13,390'. - Confirm latched fish. PU no go. - Increase pump rate to 1.8 bpm, 2900 psi. No visual indication of agitator at surface. - Set -14k downweight on fish while agitating. See weight falling off, pressure falling off. Increase pump rate to 2 bpm, 3500 psi. Final weight -6k, 3300 psi. - SD pumps. Jar down. - Repeat agitate (2.2 bpm 3900 psi, -15k), hesitate, jar down/up. No change in weighVpressure. - Repeat agitate (2.2 bpm 3900 psi, +3k), hesitate, jar down/up. - Jar. Total jar licks: 15 down, 5 up. - Agitate (2.2 bpm, 3900 psi, +12k). No movement. Decrease flow rate to 1.8 bpm, 2900 psi. Slowly gaining weight. Weight increased to 14.5k. Stack wt to 10k. Increase to 11 k. Stack wt to 5.2k. Weight increased to 6.8k. Stack wt to 2.8k. Increase to 3.4k. - Begin jarring, 20 licks. - Agitate (1.25 bpm, 1600 psi, 10K). Vary rates and weights. - Jar repeatedly (total 46: 8 up jar, 38 down jar). - Jarred up, gained weight. New PU, 42k. - RIH to 13,385', no stacking. - Decision to POOH and check. POOH. - Filling hole from the backside. LD BHA. No Fish. Notify Anchorage. Decided to try one more fishing run. Cut 150' coil. Rehead. PU Fishing BHA#3 with new jars, accelerators and agritator. RIH shallow hole test agitator. Uncertain its working as well as 3/26/2005 2.50 FISH 05:30 - 08:00 N 08:00 - 10:30 2.50 FISH N STUC PROD1 10:30-11:15 0.75 FISH N STUC PROD1 11:15 -11:45 0.50 FISH N STUC PROD1 11:45 - 12:00 0.25 FISH N STUC PROD1 12:00 - 12:30 0.50 FISH N STUC PROD1 12:30 - 14:40 2.17 FISH N STUC PROD1 14:40 - 17:15 2.58 FISH N STUC PROD1 17:15 - 19:45 2.50 FISH N STUC PROD1 19:45 - 20:45 1.00 FISH N STUC PROD1 20:45 - 22:30 1.75 FISH N STUC PROD1 22:30 - 00:00 1.50 FISH N STUC PROD1 Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Alask"Qii~~Ç~4~SS¡O¡1 Start: 3/18/2005 End: Anchor.ap'2005 Rig Release: 4/1/2005 Rig Number: 1 3/26/2005 22:30 - 00:00 1.50 FISH N STUC PROD1 previous run. Pressure possibly higher. Swap back to previously run agitator. 3/27/2005 00:00 - 02:30 2.50 FISH N STUC PROD1 RIH .shallow hole test. OK. about the same as the aborted attempt. RIH Tag fish at 13392. 02:30 - 04:00 1.50 FISH N STUC PROD1 - Up Wt 41 K - DN Wt 21 K -Actuate adgitator 2.27 bpm 4200 psi -Jar down with -20K No Go 3 hits -Actuate agitators 2.bpm 3600 psi and 2.3 @ 4150 psi 04:00 - 05:00 1.00 FISH N STUC PROD1 -Jar down 9X -Jar up 15K over No Hit - Jar down - Jar up 20K over No Hit - Agitate 2bpm @ 2800 psi holding 20 K over increasing to 30 K over. No surface indication of vibration. Increase rate to 2.5 bpm @ 4170 psi. 05:00 - 05:45 0.75 FISH N STUC PROD1 Attempt to Jar up. (Dailey) Jars not hitting up. Previous trip had Bowen Jars. Agitate by circulating 2.4 bpm @ 3875 psi. with 45K over pull. 05:45 - 09:00 3.25 FISH N STUC PROD1 Jar Down. Able to movefish 4'. Working fish Increase rate to 2.59 @ 4300 psi. Not enought rate to get MWD signal to see if we could orient. Last good TF was 20R. -Jar down seeing 4' of movement. PU max wt., lost 4' movement. -Jar down with pump on. 2.6 bpm 3780 psi multiple times. -Agitate (2.69 bpm, 4200 psi, -7k). -Jar down 10 x, got 4 feet of movement back. PU max wt. Jar down, got 4' back. Work this multiple times back and forth. 09:00 - 12:30 3.50 FISH N STUC PROD1 Wait for KCL. -Agitate (2.39 bpm, 3200 psi, -8K) - Continue to work pipe. - 50 total jar licks. 12:30 - 13:30 1.00 FISH N STUC PROD1 Begin fluid swap to 2% slick KCL. 13:30 - 16:00 2.50 FISH N STUC PROD1 POOH with fishing BHA circulating the well to KCI. 16:00 - 17:00 1.00 FISH N STUC PROD1 Lay down fishing BHA. - Baker CTC leaking. Remove and replace. Pull test to 30k, pressure test to 3500 psi. - Accelerator body had a buldge in the center. 17:00 - 19:30 2.50 FISH N STUC PROD1 Inspect and repair injector. - Bring tools to rig floor. 19:30 - 20:30 1.00 WHIP N STUC WEXIT MU whipstock and running tools MWD,Orienter etc. 20:30 - 21 :00 0.50 WHIP N STUC WEXIT Inspect and repair injector. 21 :00 - 23:30 2.50 WHIP N STUC WEXIT RIH to 13330'. 23:30 - 00:00 0.50 WHIP N STUC WEXIT Tie - in correction 1.5'+ 3/28/2005 00:00 - 00:55 0.92 WHIP N STUC WEXIT RIH to WS setting depth. Top of WS at 13370. -41K Up Wt - 20K Dn Wt - Orient to 10R - Increase rate to 2.3 bpm @ 3600 psi. To activate tool. - Bleed Off - Attempt to pressure up setting tool. Still have returns. Didn't activate tool. - Orient around the clock to 5R Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Anchorage Spud Date: 9/10/1973 End: 4/2/2005 STUC WEXIT - Increase rate to 2.6 bpm @ 4450 psi. to activate tool. - Bleed off - Pressure up WS setting tool. Shear off at 2400 psi. Got returns. - Check TF 27R POH. for milling BHA. MU BHA. Due to a backlog of 16 requests for trucks making earliest available eary afternoon decided to vis up using Flo Vis L to 1.5 ppb instead of waiting on used Flo Pro to mill window. RIH. Tag WS 13,373' MD. PU to neutral. Correct depth to 13,370' MD. Paint flag. Mill window. - 1550 psi free spin. - 2.5 bpm, 1600 psi. - Maintaining less than 3k WOB. - Window exit at 13,375.3' MD. 5.3' window. - Mill 10' of formation. Back ream thru window 2.6 bpm @ 1625 psi. Three reaming passes thru window. OK Dry Tag OK. Swap to Flo Pro. Wiper to 9700' 45 degree inclination. 2.7bpm @ 2080 psi. POH at 60 fpm. Run back thru window POH POH with window milling BHA. Mill 3.8"/3.79' and string mill 3.79"/3.79" Change out BHA. PU DS49 RIH with 1.37 motor assembly. Orient prior to entering the window. RIH to TD at 13,384' MD. - Oriented through the window at 90R. - Did see a bobble going through the window. Orient TF to 40R. 120 deg reactive torque. Directionally drill to 13,433' MD - Free spin at 3000 psi - 2.6/2.7 bom at 3300 psi - Tie in on the fly (formation marker 2' out of window). - TOWS: 13,372.2' MD - BOWS: 13,377.5' MD - RA tag: 13,380.8' MD - Orient as required. Seeing alot of reactive torque. PROD1 Orient to 105R. PROD1 Directionally drill 13,550' MD - Free spin at 3000 psi - 2.6/ 2.7 bom at 3400 psi - Orient as required. Seeing alot of reactive torque. Wiper trip to 9700' MD' 2.4 bpm @ 2650 psi. - orient through window. Pump minimum rate coming up through window. Wiper RIH to 13370 2.5bpm @ 2750 psi. Min rate with TF 70 thru window. No Problem. RIH and tag at 13548 Directionally drill to 13,700'. - 2.5/2.5 bpm at 3300 psi - Free Spin 2750 psi @ 2.5 bpm - Orient at required little reactive torque. - ROP 90 3/28/2005 00:00 - 00:55 0.92 WHIP N 00:55 - 03:30 2.58 WHIP N STUC WEXIT 03:30 - 04:30 1.00 STWHIP N STUC WEXIT 04:30 - 06:45 2.25 STWHIP N STUC WEXIT 06:45 - 18:30 11.75 STWHIP N STUC WEXIT 18:30 - 21 :45 3.25 STWHIP N STUC WEXIT 21:45 - 23:30 1.75 STWHIP N STUC WEXIT 23:30 - 00:00 0.50 STWHIP N STUC WEXIT 3/29/2005 00:00 - 01 :50 1.83 STWHIP N STUC WEXIT 01 :50 - 04:00 2.17 DRILL N STUC PROD1 04:00 - 06:15 2.25 DRILL N STUC PROD1 06:15 - 06:30 0.25 DRILL N STUC PROD1 06:30 - 07:00 0.50 DRILL N STUC PROD1 07:00 - 09:15 2.25 DRILL P PROD1 09:15 - 09:30 09:30 - 11 :30 0.25 DRILL P 2.00 DRILL P 11 :30 - 12:50 1.33 DRILL P PROD1 12:50 - 14:00 1.17 DRILL P PROD1 14:00 - 17:50 3.83 DRILL P PROD1 Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Îr,.t1~~øate: 9/10/1973 End: 4/2/2005 3/29/2005 17:50 - 20:00 2.17 DRILL P PROD1 Wiper trip up to 9700'. Circ. 30 bbl high vis pill. Some extra cuttings returns. Clean wiper trip. 20:00 - 20:45 0.75 DRILL P PROD1 Drilling Z1A, 2.7/2.7 bpm, 3150-3600 psi, 80L, 60 fph, full retu rns. Drilled to 13740'. 20:45 - 21 :00 0.25 DRILL P PROD1 Orient TF to 80R. 21 :00 - 22:20 1.33 DRILL P PROD1 Drilling Z1A, 2.7/2.7 bpm, 3150-3600 psi, 80R, 120 fph, 90 deg incl, full returns. Drilled to 13,825'. 22:20 - 22:40 0.33 DRILL P PROD1 Orient TF to 50R. 22:40 - 23:00 0.33 DRILL P PROD1 Drilling Z1A, 2.7/2.7 bpm, 3150-3600 psi, 50R, 120 fph, 90 deg incl, full returns. Drilled to 13,850'. 23:00 - 23:20 0.33 DRILL P PROD1 Wiper trip to window. Clean hole. RIH. 23:20 - 23:45 0.42 DRILL P PROD1 Log GR tie-in with RA tag at 13,381'. Added 12 ft CTD. 23:45 - 00:00 0.25 DRILL P PROD1 RIH clean to TD. Tag TD at 13,862'. 3/30/2005 00:00 - 01 :30 1.50 DRILL P PROD1 Drilling Z1 B lateral, 2.5/2.5 bpm, 3100 - 3600 psi, full returns, 85R, 95 deg incl, Drilled to 13,920'. 01 :30 - 03:45 2.25 DRILL P PROD1 Drilling Z1 B lateral, 2.5/2.5 bpm, 3100 - 3600 psi, full returns, 85R, 95 deg incl, Drilled to 14,020'. 03:45 - 05:50 2.08 DRILL P PROD1 Wiper trip to 9700 ft. Clean wiper. RIH. Start swap to new FloPro. 05:50 - 06:15 0.42 DRILL P PROD1 Ran thru window clean. RIH clean to bottom. Start on new FloPro. 06:15 - 10:00 3.75 DRILL P PROD1 Directionally drill to 14191 -2.66 /2.69 bpm @ 3370 psi. -3075 psi FS -ROP 70-90 10:00 - 11 :00 1.00 DRILL P PROD1 Wiper to window. Clean trip. 11 :00 - 14:40 3.67 DRILL P PROD1 Directionally drill to 14325 -2.66 /2.69 bpm @ 3370 psi. -3340 psi FS -ROP 70-90 Orienter failure 14:40 - 18:00 3.33 DRILL P PROD1 POH Test at Orienter at 6600' got 20 degree clicks. Continue POH. 18:00 - 19:15 1.25 DRILL P PROD1 Layout MWD BHA. C/O Sperry probe and orienter. Re-run Bit and motor. 19:15 - 19:30 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure for running 8 jts of 2-3/8" PH6 to extend BHA. 19:30 - 21 :45 2.25 DRILL P PROD1 M/U lower SWS Hyd disconnect, XO and 8 jts PH6. Drift joints, press test hyd disc, Redress upper hyd disconnect, M/U SWS MHA and NRJ. BHA = 327.89'. 21 :45 - 00:00 2.25 DRILL P PROD1 RIH with MWD lateral BHA #11 with 3.75" Bit #3 and 1.37 deg motor. SHT tools OK. RIH. Test orienter at 3100'. OK. RIH. 3/31/2005 00:00 - 00:15 0.25 DRILL P PROD1 RIH thru window clean with 8L TF. 00:15 - 00:30 0.25 DRILL P PROD1 Log GR tie-in at RA tag at 13,381'. Added 3' CTD. 00:30 - 01 :00 0.50 DRILL P PROD1 RIH, sat down full weight in shales at 13910 and 14200'. RIH to TD. Tag TD at 14329'. Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/18/2005 Rig Release: 4/1/2005 Rig Number: 1 Anchorage Spud Date: 9/10/1973 End: 4/2/2005 3/31/2005 01 :00 - 01 :30 0.50 DRILL P PROD1 Ream bottom 300' to reduce overpull. Ream back to bottom. 01 :30 - 01 :45 0.25 DRILL P PROD1 Orient TF to 80L. 01 :45 - 03:25 1.67 DRILL P PROD1 Drilling Z1 B shales. 2.6/2.6 bp,. 3200 - 3900 psi, 82L, 92 deg incl, 40 fph, stacking wt. Drilled to 14,400'. 03:25 - 03:45 0.33 DRILL P PROD1 Drilling Z1 B shales. 2.6/2.6 bp,. 3200 - 3900 psi, 82L, 92 deg incl, 40 fph, stacking wt. Added 1% LubTex to system, 4% total now. Drilled to 14,422'. 03:45 - 04:50 1.08 DRILL P PROD1 Wiper trip to window to clean up shales. Seeing 10-20K overpulls. RIH, Hole clean to 14200'. Ream shale at 14200'. RIH. 04:50 - 06:30 1.67 DRILL P PROD1 Drilling Z1 B. 2.6/2.6 bp,. 3200 - 3900 psi, 60L, 90 deg incl, 80 fph, stacking wt. Drilled to 14,530'. Stacking and overpulling 30K. 06:30 - 10:15 3.75 DRILL P PROD1 Wiper to 9700. 10:15 - 12:00 1.75 DRILL P PROD1 Directionally drill to 14575 - 2.5 / 2.6 bpm @ 3850 psi. - 3400 psi FS - 12K DN,42K Up -30 fph Stacking and sticking. 12:00 - 12:15 0.25 DRILL P PROD1 Wiper to 14200'. 12:15 - 14:25 2.17 DRILL P PROD1 Directionally drill to 14619 - 2.5 / 2.6 bpm @ 3850 psi. - 3350 psi FS - 12K DN,42K Up -14 fph Stalling at lot 14:25 - 15:15 0.83 DRILL P PROD1 Wiper to window. 15:15 - 15:30 0.25 DRILL P PROD1 Tie- in correction =12'. 15:30 - 16:00 0.50 DRILL P PROD1 Continue wiper. Tag at 14631'. 16:00 - 17:15 1.25 DRILL P PROD1 Directionally drill to 14636. - 2.8 /2.8 bpm @ 4050 psi. - 3900 psi FS - 12K DN,42K Up Stacking stalling. Motor seems weak. After consultation with Anchorage called TD at 14,636'. 17:15 - 18:00 0.75 DRILL P PROD1 Wiper to window. 18:00 - 18:30 0.50 DRILL P PROD1 Log GR tie-in with RA tag at 13381'. Added 2' to CTD. 18:30-21:15 2.75 DRILL P PROD1 RIH clean to 13900', Ream shale at 13900'. RIH. Ream shales at 14,350', 14,460'. RIH and tag finale TD at 14,636'. 21 :15 - 21 :45 0.50 DRILL P PROD1 POH while laying in 30 bbl New FloPro liner pill in open hole. Pull clean thru window. 21 :45 - 00:00 2.25 DRILL P PROD1 Flag coil at 12,500' EOP and 12,000' EOP. POH while circ at 2.8 bpm to surface. 4/1/2005 00:00 - 00:45 0.75 DRILL P PROD1 POH with lateral MWD BHA. Circ all the way to surface at 2.8 bpm. Did not see any additional cuttings when BHA reached surface. Hole is clean. 00:45 - 02:00 1.25 DRILL P PROD1 Layout MWD BHA. Recovered all equipment. Bit in gauge. Motor was worn. 02:00 - 02:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running liner. Printed: 4/4/2005 8:29:31 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: C-08 C-08 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Alaska Oil & Gas Cons. Commi$~¡(jr\ S_bmqe9/10/1973 Start: 3/18/2005 End: 4/2/2005 Rig Release: 4/1/2005 Rig Number: 1 4/1/2005 02:15 - 04:15 2.00 CASE P RUNPRD RIH with Rotating Guide shoe, 1 Jt. 2-7/8" STL, solid liner, Baker O-Ring Sub, 45 Jts of 2-7/8", STL, Pre-Drilled liner [ with 4 holes per foot, 3/8" holes ]. 04:15 - 05:00 0.75 CASE P RUNPRD M/U XO and Baker 3.70" Deployment sleeve, Baker CTLRT and SWS MHA and CTC. BHA total length = 1,334.57'. Liner length = 1,322.13'. 05:00 - 07:30 2.50 CASE P RUNPRD RIH with 2-7/8" Pre-Drilled Liner. Circ at 0.3 bpm while RIH. Tie in to flag at 12000 OK. EOP. 47K UP, 13K DN. Continue to RIH to TD. Had WT loss in shales at 13900' and 14200'. Landed liner on bottom at TD of 14,636'. 07:30 - 08:00 0.50 CASE P RUNPRD Drop Phenalic ball and displace to shear seat. Ball on seat 49 bbls. Sheared at 2700 psi. PU 35 K, released from liner. Ready to circ. well to KCL water from 13,300'. 08:00 - 14:00 6.00 CASE N WAIT RUNPRD Wait on Vac trucks. Circulate at min rate. Had request in for trucks at 05:30. No Trucks available. 6 hours lost time waiting for vac trucks. 14:00 - 15:30 1.50 CASE P RUNPRD Circulate well to KCL water. 15:30 - 17:30 2.00 CASE P RUNPRD POH to 2100'. 17:30 - 18:00 0.50 CASE P RUNPRD Freeze protect 4-1/2" tubing with MEOH from 2100' to surface. 18:00 - 18:30 0.50 CASE P RUNPRD Layout Baker liner running tools. All equipment recovered. Closed Master valve. 18:30 - 18:45 I Jet stack with side jetting nozzle. 0.25 RIGD P POST SAFETY MEETING. Review procedure, hazards and mitigation for pumping N2 to displace coil. 18:45 - 20:00 1.25 RIGD P POST Pump 10 bbl MEOH spear into coil. Displace Coil to N2, 2000 SCFPM, 1300 psi for 15 min. Bleed down N2 pressure in coil. Clean rig pits. 20:00 - 21 :30 1.50 RIGD P POST Pull coil stub to reel with cable. Secure reel with cross bar and I chains. Reel ready to pick but wind at 15-24 mph, which is above crane limit. 21 :30 - 23:00 1.50 RIGD P POST Nipple down BOPE. N/U tree cap and pressure test OK. Tree is freeze protected with MEOH. Master and Swab valves are closed. RELEASED RIG AT 2300 HRS, 04/01/05. TOTAL OF 9 DAYS, 16 HRS FROM RIG ACCEPT TO RELEASE. 23:00 - 00:00 1.00 RIGD P POST All operations from 2300 hrs will be on NK-20A Sidetrack. 25 mile rig move to Niakuk. Scope down derrick rig move via spine road thru Deadhorse. Rig move should start at about 0200 hrs, 04/02/05. Printed: 4/4/2005 8:29:31 AM Halliburton Sperry-Sun North Slope Alaska BPXA C-OBB Job No. AKMW3615830, Surveyed: 31 March, 2005 Survey Report 8 April, 2005 Your Ref: API 500292012902 Surface Coordinates: 5959556.00 N, 664509.00 E (70017' 44.9313" N, 148040' 04.2356" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 65.09ft above Mean Sea Level spe............y-5UI"l DRILLING seRVIc:es A Halliburton Company > m- e.. ::00:- IÞ S ):!oQa ::::sG") n IU ;:rf"t o """i £'" ~ . . ::tJ m C) -..:, m ):> -0 :::c t-;:) - ~ ,.¡#,piF,j: C;) o .:.J1 -, 1<;'-71 ^' ,-., Survey Ref: svy4517 Halliburton Sperry-Sun Survey Report for C-08S Your Ref: API 500292012902 Job No. AKMW3615830, Surveyed: 31 March,2005 North Slope Alaska SPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 13349.72 90.550 44,900 8942.60 9007.69 5772.41 N 175.69 E 5965330,88 N 664558,30 E -3167.01 Tie On Point 13372,20 90,900 45.040 8942.32 9007.41 5788.32 N 191,57E 5965347.12 N 664573.83 E 1.676 -3163.11 Window Point 13397.44 94.750 47.870 8941 .07 9006.16 5805.68 N 209,84 E 5965364.88 N 664591.72 E 18.922 -3158,11 13424.38 95.980 50.900 8938.55 9003.64 5823,14 N 230.20 E 5965382,78 N 664611,69 E 12,093 -3151.45 13447.15 95.880 53,470 8936.20 9001.29 5837,02 N 248.09 E 5965397,05 N 664629.27 E 11 ,235 -3144.76 . 13476.25 96.590 61.760 8933,04 8998.13 5852.50 N 272.49 E 5965413.07 N 664653.33 E 28.424 -3133.64 13507.17 96.240 66,150 8929.58 8994.67 5865,99 N 300.09 E 5965427,15 N 664680,63 E 14,154 -3118.77 13536,58 93,950 73. 0 10 8926.96 8992.05 5876.20 N 327.53 E 5965437.96 N 664707.83 E 24.502 -3102.15 13566,20 91.320 78.110 8925.60 8990,69 5883.58 N 356,1TE 5965445.96 N 664736.31 E 19.355 -3082.92 13596.90 93.690 80.390 8924,26 8989.35 5889.30 N 386~3Ò E 5965452.34 N 664766.30 E 10.707 -3061.52 13626.45 98,090 86.020 8921.23 8986,32 5892.78 N 415.47E 5965456.46 N 664795.39 E 24.098 -3039.63 13661,72 98.090 93.400 8916,26 8981,35 5892.95 N 450,36 E 5965457.40 N 664830.27 E 20.716 -3011.15 13691.28 93.950 99,900 8913.15 8978.24 5889,55 N 479.54 E 5965454,63 N 664859.51 E 25.964 -2985.29 13722,31 88,940 104.650 8912.37 8977.46 5882.95 N 509,83 E 5965448.70 N 664889.94 E 22.242 -2956.70 13753.41 88.330 98.670 8913,11 8978,20 5876.67 N 540,26 E 5965443.09 N 664920.51 E 19.323 -2928.16 13783.96 89.380 93.400 8913.72 8978.81 5873.46 N 570.63 E 5965440,55 N 664950.93 E 17.586 -2901.45 13816,44 89,210 101.130 8914.12 8979,21 5869.36 N 602.82 E 5965437.15 N 664983.21 E 23.803 -2872.72 13848.56 90.880 104,120 8914,10 8979.19 5862.34 N 634,16 E 5965430.82 N 665014.69 E 10.662 -2843.03 13883.93 95.270 109.220 8912.20 8977.29 5852.22 N 667.98 E 5965421.44 N 665048.72 E 19,007 -2809.52 13916.61 94.750 115.900 8909.34 8974.43 5839,73 N 698.02 E 5965409.61 N 665079,04 E 20.424 -2777.75 13944.40 95.180 121.520 8906.94 8972,03 5826.44 N 722,29 E 5965396.85 N 665103.59 E 20.206 -2750.24 13976.06 95.360 127,680 8904,03 8969.12 5808.55 N 748,23 E 5965379.53 N 665129.92 E 19.383 -2718.73 . 14012.73 94.130 136.820 8900.99 8966.08 5784,00 N 775.25 E 5965355.58 N 665157.47 E 25,064 -2682.52 ::Þo 14046.43 91.230 143.140 8899.41 8964.50 5758,24 N 796.88 E 5965330,30 N 665179,66 E 20.613 -2650.02 m c,., 14079.25 87,800 145.610 8899.69 8964.78 5731.56 N 816.00E 5965304.05 N 665199.35 E 12.878 -2619.07 ~ QJ Ã) «:::) 14116.03 88.070 154.220 8901,01 8966.10 5699.79 N 834.40 E 5965272.69 N 665218.45 E 23.406 -2585,76 -. » - m 14145.29 87.190 161.250 8902.23 8967.32 5672,75 N 845.47 E 5965245.90 N 665230,11 E 24.193 -2561.19 ;'.!>kO ." 14175.17 89.820 163.890 8903.01 8968.10 5644,26 N 854.42 E 5965217,61 N 665239.67 E 12.469 -2537.52 ::Ie¡') ;:::0 () M QJ 14200.46 93,340 169.860 8902.31 8967.40 5619.65 N 860.16 E 5965193,13 N 665245.95 E 27.393 -2518.70 ::r c" t-.:::) 14232.41 93,600 175.140 8900.37 8965.46 5588.05 N 864.32 E 5965161,63 N 665250.80 E 16.516 -2497.16 con ~ rn .... Q cu ::I - eaCh r-v ~ CD. 14261.25 92.110 177.070 8898.94 8964.03 5559,31 N 866.27 E 5965132,94 N 665253,39 E 8.448 -2479.08 t") c:::::> c:::::> 14287.98 90,530 181.110 8898.32 8963.41 5532.60 N 866.70 E 5965106.24 N 665254.39 E 16.225 -2463.41 Q t.J1 14328,89 92,280 178,130 8897.32 8962,41 5491.71 N 866,97 E 5965065.37 N 665255.56 E 8.445 -2439.73 .~ 0 14379.91 90.700 169.860 8895,99 8961.08 5441.03 N 872,30 E 5965014.82 N 665262.00 E 16.497 -2406.30 C;;' 14405.01 91.140 163.360 8895,58 8960.67 5416.63 N 878.11 E 5964990.55 N 665268,34 E 25.952 -2387.55 ... Õ :::I. 8 April, 2005 - 10:59 Page 2 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for C-08S Your Ref: API 500292012902 Job No. AKMW3615830, Surveyed: 31 March, 2005 North Slope Alaska SPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 14443.02 90,440 157,380 8895.06 8960.15 5380.85 N 890.87 E 5964955,06 N 665281.88 E 15,839 -2356.57 14483.17 90,090 152,110 8894.87 8959.96 5344.55 N 908,00 E 5964919,14 N 665299.80 E 13,155 -2321.72 14522.29 92.200 144,900 8894.09 8959.18 5311.22 N 928.41 E 5964886.27 N 665320,94 E 19.199 -2285,88 14549,78 89.470 143.500 8893.69 8958.78 5288.93 N 944.49 E 5964864.34 N 665337,50 E 11.160 -2259,92 14578,76 87.710 140.510 8894.40 8959.49 5266.10 N 962.32 E 5964841.90 N 665355,83 E 11.969 -2232.22 . 14611.34 89.820 137.520 8895,11 8960,20 5241 .52 N 983.68 E 5964817.79 N 665377.72 E 11 .230 -2200.63 14636.00 89.820 137.520 8895,18 8960,27 5223.33 N 1000.34 E 5964799.98 N 665394.77 E 0.000 -2176.55 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well Reference and calculated along an Azimuth of 125.000° (True), Based upon Minimum Curvature type calculations, at a Measured Depth of 14636.00fl., The Bottom Hole Displacement is 5318,26fl., in the Direction of 10,842° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 13349.72 13372.20 14636,00 9007.69 9007.41 8960,27 5772,41 N 5788,32 N 5223.33 N 175.69 E 191.57 E 1000,34 E Tie On Point Window Point Projected Survey ):II i» - .;100:" :S» ~ (ZO >m ::::I cu g..", ø n ..ë1 S! ~ ,~ (';. r . ;0 m () m - ~< 5;11 » " :;;0 ~ -:¡ 8 April, 2005 - 10:59 Page 30f 4 DrillQuest 3.03.06.008 North Slope Alaska Survey tool program for C-OB8 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 8909.39 0.00 7875,85 To Measured Vertical Depth Depth (ft) (ft) 8909.39 14636.00 7875.85 8960.27 Halliburton Sperry-Sun Survey Report for C-08B Your Ref: API 500292012902 Job No. AKMW3615830, Surveyed: 31 March, 2005 Survey Tool Description CB-GYRO-MS (C-08A) MWD Magnetic (C-08A) '> i» CIt ;lit;'" III) 5? 20 :ÞCi) :::I Q) £Of;» o ("') ¡; g ~ ~ ("') Q ~ ¡it ¡,t ër :I BPXA . . :r> \J :;0 ~ -.:¡ ~ C) C) Ul :::0 m () m - < m o 8 April, 2005 - 10:59 Page 4 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun . North Slope Alaska BPXA C-OBB PB 1 Job No. AKMW3615830, Surveyed: 25 March, 2005 Survey Report . » iii" :- :;0 5?J>m ~\),-.... » Ci) ::::0 \. ¿ ~~ ~ m š ('") ....::1 _ ....0 < ~)::;;i.ì f'.,.). ,'0 "" ~ m. ~ m o Survey Ref: svy4516 W) 2005 Your Ref: API 500292012970 Surface Coordinates: 5959556.00 N, 664509.00 E (70017'44.9313" N, 148040' 04.2356' Grid Coordinate System: NA027 Alaska State Planes, Zone 4 8 April, above Mean Sea Level S;PE!í'í'V-SUr'1 DAtL..L..tN_§" seFi\1T"~ A Halliburton Company Kelly Bushing Elevation: 65.09ft Halliburton Sperry-Sun Survey Report for C-08B PB1 Your Ref: API 500292012970 Job No. AKMW3615830, Surveyed: 25 March, 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 13381.54 91.040 45.100 8942.16 9007.25 5794,91 N 198.19 E 5965353,86 N 664580.30 E 13450,00 92.480 45.570 8940.06 9005.15 5843.01 N 246,85 E 5965403.01 N 664627.90 E 13478,04 98.610 49,000 8937.35 9002.44 5861.93 N 267,34 E 5965422.38 N 664647.97 E 13510.00 98.610 49.000 8932,56 8997.65 5882.67 N 291.19E 5965443.63 N 664671.36 E All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference, Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well Reference and calculated along an Azimuth of 125.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13510,OOfl., The Bottom Hole Displacement is 5889.87fl., in the Direction of 2.834° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 13381.54 13450.00 13510.00 9007.25 9005,15 8997,65 5794.91 N 5843,01 N 5882,67 N 198,19 E 246,85 E 291,19E Tie On Point Window Point Projected Survey Survey tool program for C-OB8 P81 Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 8909.39 0,00 8909,39 7875.85 13510.00 7875.85 CB-GYRO-MS (C-08A) 8997.65 MWD Magnetic (C-08A) Dogleg Rate (0/100ft) 2.212 25.020 0.000 Vertical Section -3161.48 -3149.20 -3143.27 -3135.63 Comment Tie On Point Window Point BPXA Projected Survey -,:. ,Q;"" ((It .~ .11) S? 20 gc-> (") C) -:;rCl:> I:) C"") ... 0 "'. ::I o "" ..~... . » -U :::0 ~ -~ N c:> c:> U1 ;0 m () m - < m \"") . 8 April, 2005 - 11 :01 Page 2 of 2 DrillQuest 3.03.06.008 TREE'" IVINIIVU\.IIID '" 2-7/8" STL 8407' 7" MILLOUT WINDOW 9584' 9634' MILL) PRUDHOE SA Y UNfr BP EKpior~tiol'! . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well C-088 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 13,349.72' MD 13,372.20' MD 14,636.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date2?&pÀM') Signed 1LA ði1J ,. Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager AUachment(s) 23-Apr-05 ~ö)-DIl . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well C-08B PB 1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 13,381.54' MD 13,450.00' MD 13,510.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Z Date ~~l;;r7/~ \ Signed, -1 ~ IihJ¡ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) 23-Apr-05 ~C::!l-a/¡ . . ·t¡:::>n'" r? n; .,. i. ' H: ¡!::;; l1uU FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL AlWD GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe C-08B BP Exploration (Alaska) Inc. Permit No: 205-011 Surface Location: 3614' NSL, 879' WEL, SEC. 19,TI1N, RI4E, UM Bottomhole Location: 3537' NSL, 182' EWL, SEC. 17, TllN, RI4E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you ITom obtaining additional permits or approvals required by law ITom other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. P e provide at least twenty-four (24) hours notice for a representative of the Commissio 0 wit ess any required test. Contact the Commission's petroleum field inspector at (907) 65 -36 ager). DATED ¿daY of February, 2005 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ( . STATE OF ALASKA I ALASKA~IL AND GAS CONSERVATION CO MISSION PERMIT TO DRILL 20 MC 25.005 \;J(.¡/t- ¡1~II~oos JAN2 B o Drill B Redrill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3614' NSL, 879' WEL, SEC. 19, T11 N, R14E, UM Top of Productive Horizon: 2848' NSL, 2037' WEL, SEC. 18, T11N, R14E, UM Total Depth: 3537' NSL, 182' EWL, SEC. 17, T11N, R14E, UM 1b. Current Well Class . . 0 Expl?ratory B Developrn~J')t.Q~,,! tJ¡M,ulti.ple.~orw '" I 0 Stratigraphic Test 0 Service 0 DevelopmerltGå5! 1El~IeHöneL>[I!i' 5. Bond: 181 Blanket 0 Single Well 11. Well Name and ..IIJ~r:qß Bond No. ZS100302630-277 PBU C-08B 6. Proposed Depth: 12. Field I Pool(s): MD 14650 rvD 8900ss Prudhoe Bay Field I Prudhoe Bay 7. Property Designation: Pool ADL 028305 . ',.' 9. Acres in Property: 2560 13. Approximate Spud Date: February 24, 2005 14. Distance to Nearest Property: 19,500' 8. Land Use Permit: 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664509 y- 5959556 Zone- ASP4 16. Deviated Wells: Kickoff Depth: 13450 feet Maximum Hole Angle: 99 degrees Hole ~ - 3-/4" \U 6 t" 18. casing Program: Size CasinQ 2-7/8" WeiQht 6.16# Specifications Grade CouplinQ LenQth L-80 STL 1250' 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): 65.09' feet 800' 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3250 Surface: 2370 ~ Too MD rvD 13400' 8942' MD 14650 rvD (includina staae data) 8900' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): 13608 Casing !=;tn u~tlJr~1 Conductor Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): I Effective Depth rvD (ft):1 9000 None 13520 I 9002 I Length Size . MO Junk (measured): None rvD Intermediate Prorlur.tion Liner 101' 2662' 8998' 20" 13-3/8" 173 sx Cement 3839 sx Permafrost II 1200 sx Halliburton Lite, 200 sx Class 'G' 100' 2662' 8998' 100' 2662' 7948' 11-3/4" x 10-3/4" x 9-518" Liner 1175' 4160' 7" 4-112" 500 sx Class 'G' 480 sx Class 'G' 8409' - 9584' 9448' - 13608' 7461' - 8431' 8316' - 9000' 20. Attachments 181 Filing Fee, $100 181 BOP Sketch o Property Plat 0 Diverter Sketch perfOration Depth rvD (ft): 9021' - 9004' 181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Seabed Report 181 Drilling Fluid Program 181 20 AAC 25.050 Requirements Perforation Depth MD (ft): 11731' - 13470' 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sean McLaughlin Title CT Drilling Engineer Date: Contact Sean McLaughlin, 564-4387 SiQnature ç.- /v"\'t~ Phone Prepared By Name/Number: 564-4387 Date 1/1.. W (\::; Terrie Hubble, 564-4628 '.fIIU' "'". J Permit App ova~oVq:-~s...&See çover.letter for Date: , ,--' { '" "I other requirements Mud Log Required 0 Yes þ?No Directional Survey Required EYes 0 No ~/f!t1 ~ Date~""""1 I 0':> Permit To Drill I API Number: Number: 2c>. ç -ð / / I 50- 029-20129-02-00 Conditions of Approval: Samples ~uired 0 Yes MNo Hydro,gén S Ifide Measures :;NYes 0 No Other:Tést p,:¡Oe' i7 '~ÇOO p{.t AoD<oved ~ Form 10-401 R)vr$"ed 06/2òbzr" APPROVED BY ( r"'; ¡ (' ¡ ~ I ^ I THE COMMISSION ¡ ì\·\ lJlt'JI\L pubmit/ln Duplicate . BP C-08B Sidetrack . CTD Sidetrack Summary 1) Mill window off whipstock 2) Drill sidetrack 3) Run slotted liner Mud Program: I · Well kill: 8.4 - 8.9 ppg brine · Milling/drilling: 8.5 - 8.9 ppg used PIo Pro or biozan for milling, new PIo Pro for drilling. Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: / · 27/8" pre-drilled liner completion 13,400' - 14,650' · No liner cement planned. Casin2lLiner Information 13 3/8", L-80, 72#, Burst 5380 psi; collapse 2670 psi 11-3/4" K-55, 54#, Burst 3560 psi; collapse 2070 psi 10-3/4" L-80, 45.5#, Burst 5210 psi; collapse 2480 psi 95/8", L-80 47#, Burst 6870, collapse 4750 7", N-80, 29#, Burst 5610 psi; collapse 7020 psi 41/2" L-80, 12.6#, Burst 8430 psi; collapse 7500 psi planned 27/8" L-80 STL 6.16#, slotted liner (hole size 3.75") Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. / · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan. Max. planned hole angle is 99deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. · Distance to nearest property - 19500 ft. · Distance to nearest well within pool -800 ft. Logging · MWD directional and Gamma Ray will be run over all of the open hole section. Hazards / · C pad is I.!QLdesignated as an HzS pad. No H2S recorded events on C-08. The maximum recorded H2S level on pad is 10 ppm (C-26 & C-27) · Drilling out of an abnormally low pressured zone- Risk of lost circulation and differential sticking. Use PIo-Pro drilling mud to minimize the risk. Reservoir Pressure · Res. press. is estimated to be 3250 psi at 8800'ss (7.1 ppg EMW). Max. surface pressure with gas (0.10 psi/ft) to surface is 2370 psi. / \ ~NOTES: MULTIPLE9-5/S" FOC'S INWELL TREE - 6" . WELLHEAD = MCEVOY ACTUA TOR = AXELSON DO NOT TEST CSG OVER 2500 PSI. WELL> 70° @ KB, ELEV = 65.1 C-08A 10207' & GOES HORIZONTAL@ 10517'. BF, ELEV - 35,34' KOP= 3000' Max Angle = 95 @ 13130' lJ I 142' -i 11-3/4" X 9-5/8" THERMOCASE II 1 Datum MD - 10629' Datum 1VD = 8800'SS 1652' -i 13-3/8" CSG, 68# X 72# XO I I 10-3/4" CSG, 45.5#, L-80, ID = 9,953" l-i 1900' 1- - 1900' -i 10-3/4" CSG X 9-5/8" CSG XO 1 I 13-3/8" CSG, 72#, N-80, ID = 12.347" 1 2056' -i 9-5/8" FOe I 2092' U J ~ I TOP OF 9-518" PBR H 2103' II I 9-5/8" SEAL ASSY 1 2112' I I 2126' H 9-5/8" Foe I Minimum ID = 3.725" @ 9436' . I 2139' -i 4-112" OTIS SSSVN, ID = 3.813" 1 4-1/2" OTIS XN NIPPLE I 9-5/8" FOG H I- GAS LIFT MANDRELS 2647' ST MD 1VD DEV TYÆ VLV LA TCH PORT DATE L 3 4329 4167 35 TDP DOME RA 16/64 05/12/95 2 7509 6696 38 TDP SO RA 16/64 05/12/95 I 9-5/8" FOC H 4203' 1-. 1 8283 7306 37 TDP DV RA 0 05/12/95 I 1 I I 8407' -i TOP OF 7" TBG STUB 1 TOP OF 7" PBR 8409' L- I I 9-5/8" X 7" BOT LNR PKR / HGR 1 8449' I 9-5/8" CSG, 47#, L-80, ID = 8.681" 1 8998' 1----4 ~ -i 4-1/2" OTIS X NIP, ID = 3,813" 1 . I I 9390' X I 9401' -i 7" X 4-112" BKR SABL-3 PKR, ID = 3,958" I ¡o I I 9425' -i 4-1/2" OTIS X NIP, ID = 3,813" 1 I 14-1/2" TBG, 12.6#, L-80, ,0152 bpf, ID = 3.958" 1- 9447' ~ . I 9436' -i 4-1/2" OTIS XN NIP, ID = 3.725" I I 17" X 4-1/2" TIW TIEBACK SLY, ID = 5.282" 1- 9448' 9448' -i 4-1/2" WLEG, ID = 3,958" I 17" X 4-1/2" TIW S-6 LNR TOP PKR, ID = 4.340" 1- ~ I 9458' :¡¡ I 9457' H ELMD TT LOG NOT A V AILABLE 1 I 7" X 5" TIW LNR HGR, ID = 4.335" 1- 9460' V I 7" LNR, 29#, N-80, .0371 bpf, ID 6.184" H 9584' rv' 7" MILL OUT WINDOW ~ 9584' - 9634' ( SECTION MILL) ÆRFORA TION SUMMARY - REF LOG: MVVD/GR ON 04/29/95 'lX ANGLEATTOPÆRF: 81 @ 11731' '<; Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-3/4" 4 11731 - 11760 0 05/06/95 2-3/4" 4 11826 - 12206 0 05/06/95 2-3/4" 4 12260 - 12450 0 05/06/95 2-3/4" 4 12600 - 12622 0 05/06/95 2-3/4" 4 12622 - 13140 0 05/06/95 2-3/4" 4 13260 - 13470 0 05/06/95 I PBTD H 13520' 1 4-112" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I, -i 13608' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BA Y UNrT 02/11/78 ORIGINAL COMPLETION WELL: C-08A 05/07/95 RIG SIDETRACK (C-08A) ÆRMrT No: 1950280 07/27/01 CHlKAK CORRECTIONS API No: 50-029-20129-01 04/05/03 KAK CLEAN UP SEC 19, T11N, R14E, 1666' SNL & 879' WEL 06/16/03 CMO/TLP KB ELEVATION CORRECTION 09/14/03 CMO/TLP DATUM MD CORRECTION BP Exploration (Alaska) . . BP-GDB Baker Hughes INTEQ Planning Report Company: BP AmoCo Date: 1/20/2005 Time: 15:13:10 P!ige: t Field: Prudhoe Bay CO-Oi"diJtate{NE) Reference: Well: C-08. True N()I'th Site: PBC Pad Vertical (TVD) Reference: 10 :08 4/8/1995 0C);0()6f¡.0 Well: C-08 Section(VS) Reference: Well.·(0.OON.0,C)C)~.1.~§·00Az:j) Wellpath: Plan#2.C-08B Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US Slate Plane Coordinate System 1927 Map Zone: Alaska. Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2004 Site: PB C Pad TR-11-14 UNITED STATES: North Slope Site Position: Northing: 5957218.72 ft Latitude: 70 17 22.367 N From: Map Easting: 662550.03 ft Longitude: 148 41 2.797 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.24 deg Well: C-08 Slot Name: Well Position: +N/-S 2294.54 ft Northing: 5959556.00 ft Latitude: 70 17 44.931 N +EI-W 2009.18 ft Easting : ~509.00 ft Longitude: 148 40 4.236 W Position Uncertainty: 0.00 ft Wellpath: Plan#2. C-08B Drilled From: C-08A Tie-on Depth: 13381.45 ft Current Datum: 10 : 08 4/8/1995 00:00 Height 65.00 ft Above System Datum: Mean Sea Level Magnetic Data: 1/19/2005 Declination: 24.91 deg Field Strength: 57628 nT Mag Dip Angle: 80.84 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 32.00 0.00 0.00 125.00 Targets Map Map <--Lå.ti~de--> .,.....Lon!ptude-> Description TVD +N/-S +EI-W Northing Easting Deg Min·Sec Beg. Min.Sec Dip. Dir. ft ft ft ft ft .. C-08B Polygon 65.00 5815.98 448.43 5965380.00 664830.00 70 1842.131 N 148 39 51.155 W -Polygon 1 65.00 5815.98 448.43 5965380.00 664830.00 70 1842.131 N 148 3951.155 W -Polygon 2 65.00 5535.56 692.37 5965105.00 665080.00 70 18 39.373 N 148 39 44.040 W -Polygon 3 65.00 5115.38 923.25 5964690.00 665320.00 70 18 35.240 N 148 39 37.307 W -Polygon 4 65.00 5238.90 1221.04 5964820.00 665615.00 70 18 36.455 N 148 39 28.621 W -Polygon 5 65.00 5835.25 939.01 5965410.00 665320.00 70 18 42.320 N 148 39 36.845 W -Polygon 6 65.00 6131.11 675.40 5965700.00 665050.00 70 18 45.230 N 148 39 44.533 W Fault 1 C-08B 65.00 5841.89 178.92 5965400.00 664560.00 70 18 42.386 N 148 39 59.016 W -Polygon 1 65.00 5841.89 178.92 5965400.00 664560.00 70 18 42.386 N 148 39 59.016 W -Polygon 2 65.00 6186.47 431.54 5965750.00 664805.00 70 18 45.775 N 148 39 51.647 W -Polygon 3 65.00 6443.03 592.20 5966010.00 664960.00 70 18 48.298 N 148 39 46.960 W Fault 2 C-08B 65.00 0.00 0.00 5959556.00 664509.00 70 17 44.931 N 148 40 4.236 W -Polygon 1 65.00 4735.29 464.78 5964300.00 664870.00 70 18 31.502 N 148 39 50.680 W -Polygon 2 65.00 4824.07 1206.96 5964405.00 665610.00 70 18 32.375 N 148 39 29.034 W C-08B T1 8965.00 5648.91 814.89 5965221.00 665200.00 70 18 40.488 N 148 39 40.466 W C-08B T2 8965.00 5202.95 1035.20 5964780.00 665430.00 70 18 36.101 N 148 39 34.042 W Annotation MD ~ ft 13412.70 9006.40 TIP 13450.00 9005.02 KOP 13470.00 9003.89 End of 9 DLS 13510.00 8999.01 4 13630.00 8984.01 5 - End of 30 DLS 14130.00 8964.97 6 . . BP-GDB Baker Hughes INTEQ Planning Report Company; BP Amoço Date: 1120/2005 Time: 15:13:10 'l1Ie: 2 Field: PrudhO$Baý Co--ordinate(NE) Referenee: ,^,ell¡~8, True Nortn Site: RBC Pad Vertical (TVD) Reference: 10:084/811995 00:9065.0 WeD: C"08 Section (VS) Reference: VVell...~q.qq~.0··OOE,125·00Azi) Wi!Dpath: Planll2,C-08B Survey Calculation Method: Minimum Curvature Db: Otãcle Annotation I S~~~~ TVD ft 8964.97 7 14650.00 8964.97 TD Plan: Plan #2 C-08B Date Composed: 1/19/2005 Same as Lamar's plan#2 Version: 6 Principal: Yes Tied-to: From: Definitive Path Plan Section Information Inel Azim +N/-S +E/~W DLS BuDd Turn DO deg deg ft ft deg/10Oft deg/10Oftdeg/100ft deg 13381.45 91.04 45.10 9007.16 5794.84 198.16 0.00 0.00 0.00 0.00 13412.70 91.75 45.21 9006.40 5816.87 220.31 2.30 2.27 0.35 8.80 13450.00 92.48 45.57 9005.02 5843.05 246.85 2.18 1.96 0.97 26.23 13470.00 94.04 46.47 9003.89 5856.92 261.22 9.00 7.79 4.51 30.00 13510.00 99.94 57.01 8999.01 5881.47 292.32 30.00 14.75 26.33 60.00 13630.00 93.96 92.79 8984.01 5911.74 405.42 30.00 -4.98 29.82 97.00 14130.00 90.00 152.71 8964.97 5653.34 806.47 12.00 -0.79 11.98 92.29 14280.00 90.00 170.71 8964.97 5511.50 853.34 12.00 0.00 12.00 90.00 14650.00 90.00 126.31 8964.97 5203.81 1041.78 12.00 0.00 -12.00 270.00 Survey Inel Azim SSTVD N/S EIW MapN deg (jeg ft ft ft ft 13381.45 /91.04 45.10 8942.16 5794.84 198.16 5965353.39 664580.27 -3161.46 0.00 MWD 13400.00 91.46 45.17 8941.76 5807.93 211.31 5965366.76 664593.13 -3158.20 2.30 MWD 13412.70 91.75 45.21 8941.40 5816.87 220.31 5965375.90 664601.93 -3155.95 2.30 MWD 13450.00 92.48 45.57 8940.02 5843.05 246.85 5965402.65 664627.89 -3149.23 2.18 MWD 13470.00 94.04 46.47 8938.89 5856.92 261.22 5965416.82 664641.95 -3145.41 9.00 MWD 13480.00 95.53 49.08 8938.05 5863.61 268.60 5965423.68 664649.18 -3143.21 30.00 60.00 MWD 13490.00 97.02 51.71 8936.96 5869.95 276.25 5965430.18 664656.69 -3140.57 30.00 60.22 MWD 13500.00 98.49 54.35 8935.61 5875.91 284.17 5965436.31 664664.48 -3137.50 30.00 60.50 MWD 13510.00 99.94 57.01 8934.01 5881.47 292.32 5965442.05 664672.50 -3134.02 30.00 60.86 MWD 13520.00 99.56 60.02 8932.32 5886.62 300.72 5965447.38 664680.79 -3130.09 30.00 97.00 MWD 13530.00 99.15 63.04 8930.69 5891.32 309.40 5965452.27 664689.36 -3125.68 30.00 97.51 MWD 13540.00 98.72 66.04 8929.14 5895.57 318.31 5965456.71 664698.18 -3120.81 30.00 98.00 MWD 13550.00 98.27 69.04 8927.66 5899.35 327.45 5965460.69 664707.23 -3115.49 30.00 98.47 MWD 13560.00 97.80 72.03 8926.26 5902.64 336.79 5965464.19 664716.49 -3109.74 30.00 98.91 MWD 13570.00 97.30 75.02 8924.95 5905.46 346.29 5965467.21 664725.93 -3103.56 30.00 99.33 MWD 13580.00 96.78 77.99 8923.72 5907.77 355.94 5965469.74 664735.53 -3096.99 30.00 99.72 MWD 13590.00 96.25 80.97 8922.59 5909.58 365.71 5965471.76 664745.25 -3090.03 30.00 100.09 MWD 13600.00 95.70 83.93 8921.54 5910.89 375.57 5965473.29 664755.08 -3082.70 30.00 100.42 MWD 13610.00 95.13 86.89 8920.60 5911.69 385.49 5965474.30 664764.98 -3075.03 30.00 100.73 MWD 13620.00 94.55 89.84 8919.76 5911.97 395.45 5965474.80 664774.93 -3067.03 30.00 101.01 MWD 13630.00 93.96 92.79 8919.01 5911.74 405.42 5965474.79 664784.90 -3058.74 30.00 101.26 MWD 13650.00 93.86 95.20 8917.65 5910.35 425.32 5965473.83 664804.83 -3041.63 12.00 92.29 MWD 13675.00 93.73 98.20 8916.00 5907.44 450.09 5965471.47 664829.66 -3019.67 12.00 92.45 MWD 13700.00 93.58 101.20 8914.40 5903.24 474.68 5965467.80 664854.33 -2997.12 12.00 92.65 MWD 13725.00 93.43 104.21 8912.87 5897.75 499.02 5965462.85 664878.79 -2974.03 12.00 92.84 MWD 13750.00 93.27 107.21 8911.41 5890.99 523.05 5965456.62 664902.95 -2950.48 12.00 93.03 MWD 13775.00 93.09 110.21 8910.02 5882.99 546.69 5965449.14 664926.76 -2926.53 12.00 93.20 MWD 13800.00 92.91 113.20 8908.71 5873.76 569.88 5965440.42 664950.14 -2902.23 12.00 93.37 MWD 13825.00 92.73 116.20 8907.48 5863.32 592.56 5965430.48 664973.05 -2877.67 12.00 93.53 MWD 13850.00 92.53 119.20 8906.34 5851.72 614.67 5965419.36 664995.40 -2852.90 12.00 93.67 MWD 13875.00 92.33 122.19 8905.28 5838.97 636.14 5965407.09 665017.15 -2827.99 12.00 93.81 MWD 13900.00 92.12 125.19 8904.31 5825.11 656.93 5965393.69 665038.23 -2803.02 12.00 93.94 MWD 13925.00 91.90 128.18 8903.43 5810.18 676.96 5965379.21 665058.58 -2778.05 12.00 94.05 MWD . . BP-GDB Baker Hughes INTEQ Planning Report Company: BP Amoco Date~ 112012005 Time: <15;13:10 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-QIJ.Tl"\Je North Site: PB C Pad Vertical (TVD) Reference: 10: 0841IJ/1995 00:OQ65.Q Well: C-08 Section (VS) Reference: Well (MQN,O.QOE,125.00Azi) We"pllth: Plan#2. C-08B Survey CalcnlatJonMethod: Minimum Curvature Db: Oracle Survey MD Ind Azim SSTVD N/S EIW MapN MImE VS DLS Tóolface . Tool ft deg deg ft ft ft ft ft ft deg/10Qf1 deg 13950.00 91.68 131.18 8902.65 5794.23 696.19 5965363.68 665078.16 -2753.15 12.00 94.16 MWD 13975.00 91.46 134.17 8901.96 5777.29 714.56 5965347.15 665096.89 -2728.39 12.00 94.25 MWD 14000.00 91.23 137.16 8901.38 5759.42 732.02 5965329.66 665114.74 -2703.83 12.00 94.34 MWD 14025.00 91.00 140.15 8900.89 5740.66 748.53 5965311.27 665131.66 -2679.54 12.00 94.41 MWD 14050.00 90.76 143.14 8900.51 5721.05 764.04 5965292.01 665147.59 -2655.60 12.00 94.46 MWD 14075.00 90.53 146.14 8900.22 5700.67 778.51 5965271.95 665162.50 -2632.05 12.00 94.51 MWD 14100.00 90.29 149.13 8900.05 5679.56 791.89 5965251.14 665176.34 -2608.98 12.00 94.54 MWD 14125.00 90.05 152.12 8899.97 5657,78 804.15 5965229.63 665189.07 -2586.44 12.00 94.56 MWD 14130.00 90.00 152.71 8899.97 5653.34 806.47 5965225.25 665191.49 -2582.00 12.00 94.57 MWD 14150.00 90.00 155.11 8899.97 5635.38 815.26 5965207.49 665200.67 -2564.50 12.00 90.00 MWD 14175.00 90.00 158.11 8899.97 5612.44 825.18 5965184.77 665211.09 -2543.21 12.00 90.00 MWD 14200.00 90.00 161.11 8899.97 5589.01 833.89 5965161.53 665220.31 -2522.64 12.00 90.00 MWD 14225.00 90.00 164.11 8899.97 5565.15 841.36 5965137.85 665228.30 -2502.84 12.00 90.00 MWD 14250.00 90.00 167.11 8899.97 5540.94 847.57 5965113.78 665235.03 -2483.86 12.00 90.00 MWD 14275.00 90.00 170.11 8899.97 5516.43 852.50 5965089.39 665240.50 -2465.77 12.00 90.00 MWD 14280.00 90.00 170.71 8899.97 5511.50 853.34 5965084.48 665241.44 -2462.26 12.00 90.00 MWD 14300.00 90.00 168.31 8899.97 5491.84 856.98 5965064.90 665245.51 -2448.00 12.00 270.00 MWD 14325.00 90.00 165.31 8899.97 5467.50 862.68 5965040.69 665251.75 -2429.36 12.00 270.00 MWD 14350.00 90.00 162.31 8899.97 5443.49 869.65 5965016.85 665259.24 -2409.89 12.00 270.00 MWD 14375.00 90.00 159.31 8899.97 5419.88 877.86 5964993.42 665267.97 -2389.62 12.00 270.00 MWD 14400.00 90.00 156.31 8899.97 5396.74 887.30 5964970.49 665277.91 -2368.61 12.00 270.00 MWD 14425.00 90.00 153.31 8899.97 5374.12 897.94 5964948.11 665289.04 -2346.92 12.00 270.00 MWD 14450.00 90.00 150.31 8899.97 5352.08 909.74 5964926.34 665301.32 -2324.61 12.00 270.00 MWD 14475.00 90.00 147.31 8899.97 5330.70 922.69 5964905.25 665314.73 -2301.74 12.00 270.00 MWD 14500.00 90.00 144.31 8899.97 5310.02 936.73 5964884.88 665329.22 -2278.38 12.00 270.00 MWD 14525.00 90.00 141.31 8899.97 5290.11 951.84 5964865.31 665344.76 -2254.58 12.00 270.00 MWD 14550.00 90.00 138.31 8899.97 5271.01 967.97 5964846.57 665361.31 -2230.41 12.00 270.00 MWD 14575.00 90.00 135.31 8899.97 5252.78 985.08 5964828.72 665378.81 -2205.94 12.00 270.00 MWD 14600.00 90.00 132.31 8899.97 5235.48 1003.11 5964811.81 665397.22 -2181.24 12.00 270.00 MWD 14625.00 / 90.00 129.31 8899.97 5219.14 1022.03 5964795.90 665416.49 -2156.37 12.00 270.00 MWD 14650.00 90.00 126.31 8899.97 5203.81 1041.78 5964781.01 665436.56 -2131.41 12.00 270.00 MWD Plan: Plan #2 G-088 (C-OBJPlan#2, G-OSB) PM at BP "- WEI.J.PA'I"H CETAtLa: PfaJ't#2,c4Sa p~ WeilpaUu c.... TÎe 01'1 Mf>¡ 13331.45 Ref.Oa~ 10! 08 4181'1&9$ OU:OO ...- V.Section ~~ ~.= ~~ - 1.25.00" .... 0.00 32.06 - REFERENCE INFORMA T!ON c(J8, Sea ).001 Me< 150( 00 aWn: ... .. ..... ~ Tatpt , , ¡ : : All Measurements are from top of Riser 1/27/2005 ~ CD en o- cr C-08B top of bag BAG 71/16" 5000 psi. bttm of bag middle of slips Blind/Shears -......................... middle of pipes TOTs .....................·····7 1/16" 5000psi middle of flow cross Mud Cross Mud Cross 7 1/16" 5000psi middle of blind/shears .......................... middle of pipe/slips TOTs .....................·····7 1/16" 5000psi Flow Tee TERRIE L HUBBLE BP EXPLORATION AK INC POBOX 196612 MB 7-5 ANCHORAGE, AK 99519-6612 89-6/1252 175 "Mastercard Check" DATEO('~~Q5 ,$JOO.O() b~~l~rig~~~~7~c ~ional Bank Alaska Anchorage, AK 99501 MEMO C~OOß DOLLARS .~ I: ~ 25 20001;OI:QQ ~~IIII; 2 2 7"' ~ 5 51;11- 0 ~ 75 . . . TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERJP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELLNAME/~ C-O~ß PTD# 20S-0// X Development Service Exploration Stratigraphic CHECK WßA T ADD-ONS ~'CLUE", APPLIES (OPTIONS) MULTI Tbe permit is for a Dew weUbore segment of LATERAL existing weD . Permit No, API No. . (If API number Production.sbould continue to be reported as last two, (2) digits a function· of tbe original API number. stated are between 60-69) above. . PILOT HOLE )n accordance witb· 20 AAC 25.005(f), all (PH) records, data and logs acquired for tbe pilot bole must be dearly differentiated "in botb Dame (name on permit plus PH) .' and API Dumber (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject ·to fun EXCEPTION compJiance witb 20 AAC 25.,OSS~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spa dng ex ception. (Company Name) assumes tbe liability of any protest to tbe spacing .eJception tbat may occur. : DRY DITCH AU dry ditcb sample sets submitted to tbe SAMPLE Commission must be in no greater than 30' " sample intervals from below tbe permafrost or from wbere samples are fint caught and ] 0' sample h:iter:va1s through target zones. .. Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 PTD#: 2050110 Company SP EXPLORATION (ALASKA) INC Initial ClasslType 1 Permit fee ¡¡ttache~d ~ ~ ~ ~ Yes 2 Le¡¡se ~n!Jmberappropri<lte ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Yes ~ ~ 3 ~U~niq!Je welln~arne~and lJumb~er ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . . . ~ . . . . . . . . ~ . . Yes. . ~ . . . . . . . . . . . . . . . . . . . . . . . ~ . . . . . . . . . . . . ~ ~ . . . . . . ~ . . . . . . . . . . . . . 4 Wellloc<lted inad.efine!:lppol. . . . . Yes. . 5 Wellloc<lted proper .distance from driJling !JrJitbo!Jndary. . . . . . .. .. Yes 6 Wellloc<lted pr~operdistance. from other wells . Yes. 7 .S.u{ficienlacn:¡¡¡geay¡¡il<lble indJilliIJ9 unjl . Yes. 8 Itdevi¡¡ted, js. wellbore platincJuded . . . . . .. ......... ~ . ~ . . . . . . ~ . . Yes . ~ 19 Qper.ator only ¡¡ftected Pé!rty. . . Yes. 10 .O-per.ator bé!s.apprppriateJ:1.ond inJQrce . . . . . ~ . . . . . . . . . . . ~ . . . . . . . . . . . .Yes . . . . . . . . . . . . . . . . . . . . . . . . ~ . ~ . . . . . . . . . . . . . ~ . . . . . . . . . . . ~ . . . . . . . . 11 Permit C<!n be issued wHhQut conSEHva.tion order . . . . . . . .. ~........... Yes. 12 Permit can be issued wHbout ad.ministrative.a'pprpval ~ . . . ~ . . . . Yes ~ 1/31/2005 13 Can permit be approved before 15-daywait Yes 14 WeJI located within ¡¡reé! ¡¡ndstrat<la!Jthorized by hljectiplJ Order # (P!Jt 10# in~ c.ornrnellts) (For .NA 15 .AJlweIJs.witJ1ln1l4J'Dite.are.a.ofreyiewjd.elltified(Fpr$ervjcewellonIYL.. ~.... . ~ .NA.......................... ~. ~..... _...................... 16 PJe-produçed injector; .d!Jralionof pre--prod!Jçtion less th¡¡n 3 months. (Forservlce welt onJy) . . NA 17 ACMPFjndjng of Consi'slency.h.as beenjss!Jed fprtbis proiect . . . . . ~ ... NA . . Administration Appr RPC Date Engineering Appr Date WGA 1/31/2005 ---- Geology Appr Date RPC Geologic Commissioner: iJ"M Well Name: PRUDHOE BAY UNIT C-08B DEV /1-0IL GeoArea 890 Program DEV On/Off Shore On Unit 11650 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18 19 20 21 22 23 '24 25 26 27 28 29 30 31 32 33 34 .Collduclor stringpJovided . . ~ .. ~. . . . . . ~ . . Surf¡¡cecasingpJotects é!ILknown USDWs . . . . . . . CMTvoté!dequate.to circutate on cpnd.uctot& SUJ(csg . CMT v.ol é!dequateto tie-lnJongstring los!Jrf çsg. . . . . . . . ~CMT will coyeraJl knownpro~d!JctiYe borizons . . . . . . . . C.asillg desigllS adeC1uaJe fpr C,T, B& permé!ftost ~Adequatet¡¡nkageoJ re.serve pit. . . . . . . . l(aJe-drill., h¡¡sa tOA03 for abé!ndonment beell <lPPJoved . . . . . . . . .Mequale.wellbore separ<ltjo.n.pro-posed. . . _ . . . . . . . . . . . . _ . . . . . . . Jtdjverter Jeq.uiJed. does jt meet regulations. . .DJiUillg fJujd.progré!m schematic.& eq.ui'pJistadequ<lle. . . . . ~ . ~ . .SOPEs,.dothey meetreguJé!tion ~ . . . . ~ ~ . . . ~ . . ~ . . . . . . . ~ . . BPPEpress ra.till9 ap.proprié!te; .test lo(put psig in comments) . . . ~ . . . Choke.mé!njfold compJies w/API RF'-53 (May 84) . . . _ ~ . . . Work will pccj.Jr withputoperatjonshutdown. . Is presence. of H2S g¡¡S prob.able . MechanicaLcPlJdjt[on pf wells within AOR yerified (Fprservice wel] only) . ... NA NA NA NA . . .No~ . . . . . . . Yes. . . . . . ~ .. Yes ~ ..... CTDU.. .... Yes ~ . . . . . . ~ ~ Yes. . . . . . . . . . . ~ . . . . . . . - - - - - - - - - - - - - - - - - - - - - - . . . . . Slotted, - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - ~ Sidetrack. . ~ . Max MW8,9. ppg, .. NA.. - - - - - - - - - - - - - - ... Yes... ~ Yes. . Yes ~ ~ Yes. ..... Yes. .......... No. ~ NA . - - - - - - - - -- - - - - - - - . . Testt03500 psi. ~ - - - - - - - - .. - - - - - - - ~ Nolan H2S pad.. . - - - - - - - - - - - - - 35 Permit. c.all be issued wlo hydrogen~ s.ulfide me¡¡s.ures . 36D.ata~PJeselJted on pote.ntié!1 pvemres.s!Jre zones . 37 ~SeLsmicanalysjs~ of shallow gé!s.zpoes . . . . . . . . . . . 38 .Seabed wnditiPIJ survey ~(if off-sho(e) ~ .. ~ ~ ~ . . . . . . . ~ . . . . 39 . Conta.clnamelpJ1onefor.weekly prpgressreports [explQratpryonlYl .... No NA ~ .... NA.. .... NA. ~ . .NA - - - ~ - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - Well bore seg Annular Disposal - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - Date: Engineering Commissioner: Date jI$;j~ Date I / ð / )S - - - - - - - - o . . . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infoffilation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . . Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Mar 06 15:23:26 2007 Reel Header Service name............ .LISTPE Date.................... .07/03/06 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name....... ........ . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name.. .......... .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/03/06 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name........... .... .UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA C-08B PB1 50029201297100 BP Exploration (Alaska) Inc. Sperry Drilling Services 05-FEB-07 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 MW0003615830 B. JAHN B. HOLT/B. L # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 19 llN 14E 3614 879 65.09 .00 30.24 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 4.500 13450.0 # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - (TVDSS) . 'los- .. at ( * SUBSEA ¡ c{ š(D . . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK,THE TOP OF WHICH WAS AT 13450'MD/894' TVDSS IN THE C-08 WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND A BIT OF RAT HOLE WAS DRILLED DURING MWD RUN 1. UPHOLE SGRD TIE- IN DATA AND MWD RUN 1 SGRD DATA ARE MERGED WITH MWD RUN 2 DATA. 4. MWD RUN 2 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) , UTILIZING SCINTILLATION DETECTORS. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. DORTCH (SAIC/BP) DATED 1/26/2007, QUOTING AUTHORIZATION FROM DOUG STONER (BP). MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1 & 2 REPRESENT WELL C-08B PB1 WITH API #: 50-029-20129-71-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13510'MD/8941'TVDSS. SROP SGRD SMOOTHED RATE OF PENETRATION WHILE DRILLING. SMOOTHED NATURAL GAMMA RAY. $ File Header Service name.. .......... .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .07/03/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 13373.5 13468.0 STOP DEPTH 13475.5 13510.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD $ BIT RUN NO MERGE TOP 2 13373.5 MERGE BASE 13510.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..... .............0 Data Specification Block Type.....O Logging Direction.. ............. ..Down Optical log depth units..... ... ...Feet Data Reference Point....... ..... ..Undefined Frame Spacing..................... 60 .1IN Max frames per record. . . . . ....... .Undefined Absent value...................... -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13373.5 13510 13441.8 274 13373.5 13510 GR MWD API 37.37 402.64 66.9365 168 13373.5 13475.5 ROP MWD FT/H 2.57 1082 117.878 85 13468 13510 First Reading For Entire File......... .13373.5 Last Reading For Entire File.......... .13510 File Trailer Service name... ......... .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/03/06 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name... ......... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation... ....07/03/06 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 2 .5000 START DEPTH 13373.5 13468.0 STOP DEPTH 13475.5 13510.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 25-MAR-05 Insite 3.35 Memory 13510.0 13450.0 13510.0 98.6 98.6 # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray TOOL NUMBER TLG011 # BOREHOLE AND CASING DATA . OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type....... ...........0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units... ........Feet Data Reference Point....... .......Undefined Frame Spacing..................... 60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name DEPT GR ROP Service Order Nsam Rep 1 68 1 68 1 68 Code Units FT API FT/H Size 4 4 4 MWD020 MWD020 3.750 13450.0 Flo Pro 8.60 65.0 8.5 23000 5.8 .000 .000 .000 .000 Offset o 4 8 Channel 1 2 3 .0 188.1 .0 .0 . First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13373.5 13510 13441.8 274 13373.5 13510 GR MWD020 API 37.37 402.64 66.9365 168 13373.5 13475.5 ROP MWD020 FT/H 2.57 1082 117.878 85 13468 13510 First Reading For Entire File........ ..13373.5 Last Reading For Entire File. ..........13510 File Trailer Service name... ...,..... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.. .....07/03/06 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.003 Physical EOF Tape Trailer Service name............ .LISTPE Date. .......... ... ,..... .07/03/06 Origin............ ...... .STS Tape Name........., ..... . UNKNOWN Continuation Number..... .01 ~ . . Next Tape Name...... .....UNKNOWN Comments.............. ...STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name........... ..LISTPE Date....... ............. .07/03/06 Origin. . . . . . . . . . . . . . . . . . .STS Reel Name............... . UNKNOWN Continuation Number. . . . . .01 Next Reel Name.......... . UNKNOWN Comments.... ............ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File e Sperry-Sun Drilling Services LIS Scan Utility e $Revision: 3 $ LisLib $Revision: 4 $ Mon Feb 05 13:56:13 2007 Reel Header Service name........ .... .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name........... ..LISTPE Date.................... .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.............. ..UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA C-08B 50029201290200 BP Exploration (Alaska) Inc. Sperry Drilling Services 05-FEB-07 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0003615830 B. JAHN B. HOLT/B. L MWD RUN 5 MW0003615830 B. JAHN B. LAULE/R. # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 19 llN 14E 3614 879 MSL 0) 65.09 30.24 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 4.500 13372.0 # .d6.."S--ð/1 # /1ðI1IJ1J1 iLl S-I k e e REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 13372'MD/8942 TVDSS IN THE C-08 WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND A BIT OF RAT HOLE WAS DRILLED DURING MWD RUN 3. NO DATA ARE PRESENTED FOR MWD RUN 3. THIS WELLBORE WAS NECESSITATED BY THE LOSS OF THE BRA IN C-08B PB1. 4. MWD RUNS 4 & 5 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG), UTILIZING SCINTILLATION DETECTORS. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. DORTCH (SAIC/BP) DATED 1/26/2007, QUOTING AUTHORIZATION FROM DOUG STONER (BP). MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 3-5 REPRESENT WELL C-08B WITH API #: 50-029-20129-02-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14636'MD/8895'TVDSS. SROP SGRD SMOOTHED RATE OF PENETRATION WHILE DRILLING. SMOOTHED NATURAL GAMMA RAY. $ File Header Service name............ .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record..65535 File Type.............. ..LO Previous File Name..... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 13354.0 13384.0 STOP DEPTH 14605.5 14636.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # e e MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ BIT RUN NO 4 5 MERGE TOP 13354.0 14329.0 MERGE BASE 14329.0 14636.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type.............. ....0 Data Specification Block Type... ..0 Logging Direction........... ......Down Optical log depth units...... .....Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value.................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT API FT/H Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT GR ROP MWD MWD Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13354 14636 13 995 2565 13354 14636 GR MWD API 28.21 754.48 68.314 2504 13354 14605.5 ROP MWD FT/H 0.22 4191.38 120.49 2505 13384 14636 First Reading For Entire File......... .13354 Last Reading For Entire File.......... .14636 File Trailer Service name... ......... .STSLIB.001 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type.... ........... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: 2 header data for each bit run in separate files. 4 .5000 e # FILE SUMMARY VENDOR TOOL CODE GR ROP $ START DEPTH 13354.0 13384.0 STOP DEPTH 14298.0 14329.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point......... ... ..Undefined Frame Spacing................... ..60 .1IN Max frames per record... ......... .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O e 30-MAR-05 Insite 3.35 Memory 14329.0 13383.0 14329.0 87.2 98.1 TOOL NUMBER TLG015 3.750 13377.0 Flo Pro 8.60 65.0 8.9 23000 6.4 .000 .000 .000 .000 .0 179.7 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 e e GR MWD040 ROP MWD040 API FT/H 4 4 1 68 1 68 4 8 2 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13354 14329 13841.5 1951 13354 14329 GR MWD040 API 29.97 754.48 70.3153 1889 13354 14298 ROP MWD040 FT/H 6.86 4183.48 118.745 1891 13384 14329 First Reading For Entire File......... .13354 Last Reading For Entire File......... ..14329 File Trailer Service name........... ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type... ............ .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..07/02/05 Maximum Physical Record..65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 3 header data for each bit run in separate files. 5 .5000 START DEPTH 14298.5 14329.5 STOP DEPTH 14605.5 14636.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 31-MAR-05 Insite 3.35 Memory 14636.0 14329.0 14636.0 87.7 92.3 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG $ e Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type. ....0 Logging Direction.............. ...Down Optical log depth units......... ..Feet Data Reference Point..... ........ .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT GR MWD050 ROP MWD050 Units FT API FT/H Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code TLG002 3.750 13377.0 Flo Pro 8.60 65.0 9.1 40400 6.6 .000 .000 .000 .000 Offset o 4 8 Channel 1 2 3 e .0 188.1 .0 .0 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 14298.5 14636 14467.3 676 14298.5 14636 GR MWD050 API 28.21 138.88 62.1669 615 14298.5 14605.5 ROP MWD050 FT/H 0.22 4191. 38 125.864 614 14329.5 14636 First Reading For Entire File......... .14298.5 Last Reading For Entire File.......... .14636 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type............... .LO e Next File Name.......... .STSLIB.004 e Physical EOF Tape Trailer Service name. ........... .LISTPE Date.................... .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name. . . . . . . . . . . . . . . .UNKNOWN Continuation Number..... .01 Next Tape Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File e Sperry-Sun Drilling Services LIS Scan Utility e $Revision: 3 $ LisLib $Revision: 4 $ Mon Feb 05 13:43:59 2007 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation Number. .... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA C-08B PB1 50029201297000 BP Exploration (Alaska) Inc. Sperry Drilling Services 05-FEB-07 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 MW0003615830 B. JAHN B. HOLT/B. L # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 19 11N 14E 3614 879 65.09 .00 30.24 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 3.750 4.500 13450.0 # aos--ot I p: I~S-/ 0 e e REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK,THE TOP OF WHICH WAS AT 13450'MD/894' TVDSS IN THE C-08 WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND A BIT OF RAT HOLE WAS DRILLED DURING MWD RUN 1. UPHOLE SGRD TIE- IN DATA AND MWD RUN 1 SGRD DATA ARE MERGED WITH MWD RUN 2 DATA. 4. MWD RUN 2 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) , UTILIZING SCINTILLATION DETECTORS. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. DORTCH (SAIC/BP) DATED 1/26/2007, QUOTING AUTHORIZATION FROM DOUG STONER (BP). MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1 & 2 REPRESENT WELL C-08B PB1 WITH API #: 50-029-20129-70-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13510'MD/8941'TVDSS. SROP SGRD SMOOTHED RATE OF PENETRATION WHILE DRILLING. SMOOTHED NATURAL GAMMA RAY. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type............... .LO Previous File Name..... ..STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 13373.5 13468.0 STOP DEPTH 13475.5 13510.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE e e MWD $ 2 13373.5 13510.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction.. ...... ........ . Down Optical log depth units......... ..Feet Data Reference Point............. .Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value.................... .,-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT API FT/H Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT GR ROP MWD MWD Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13373.5 13510 13441.8 274 13373.5 13510 GR MWD API 37.37 402.64 66.9365 168 13373.5 13475.5 ROP MWD FT/H 2.57 1082 117.878 85 13468 13510 First Reading For Entire File......... .13373.5 Last Reading For Entire File.......... .13510 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name........... ..STSLIB.002 Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation..... ..07/02/05 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE 2 header data for each bit run in separate files. 2 .5000 START DEPTH STOP DEPTH GR ROP $ e 13373.5 13468.0 13475.5 13510.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE PCG $ BOTTOM) TOOL TYPE Natural gamma ray # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point.... ......... .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value............ ......... .-999 Depth units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name DEPT GR ROP Service Order Units FT API FT/H Nsam Rep 1 68 1 68 1 68 Code Size 4 4 4 MWD020 MWD020 e 25-MAR-05 Insite 3.35 Memory 13510.0 13450.0 13510.0 98.6 98.6 TOOL NUMBER TLG011 3.750 13450.0 Flo Pro 8.60 65.0 8.5 23000 5.8 .000 .000 .000 .000 .0 188.1 .0 .0 Offset o 4 8 Channel 1 2 3 e e First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13373.5 13510 13441.8 274 13373.5 13510 GR MWD020 API 37.37 402.64 66.9365 168 13373.5 13475.5 ROP MWD020 FT/H 2.57 1082 117.878 85 13468 13510 First Reading For Entire File.... ..... .13373.5 Last Reading For Entire File... .... ... .13510 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .07/02/05 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Next Tape Name. ......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date.................... .07/02/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name.............. ..UNKNOWN Continuation Number..... .01 Next Reel Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File