HomeMy WebLinkAbout205-053STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Is. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned 0 • Suspended ❑I
RI
A,6 RrRA.16 L/
.�1��
1 b. Well Class:
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions! Zero
Development 0 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2- Operator Name:
6. Date Comp., Susp., or Abend.:
14. Permit to Drill Number/Sundry
BP Exploration (Alaska), Inc
5/30/2019
205-053 • 318529
3, Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 995196612
4/17/2005
50-029-21980-02-00
4a. Location of Well (Governmental Section):
8, Date TO Reached:
16. Well Name and Number:
4/24/2005
PBU F -34B -
Surface: 2133' FNL, 2412' FWL, Sec. 02, T1 IN. R13E, UM
9 Ref Elevations KB 64.38
17. Field/Pool(s):
Top of Productive Interval: 1920' FSL, 4387' FWL, Sec. 35, T12N. R13E, UM
GL 35.99 BF 35.67
PRUDHOE BAY, PRUDHOE OIL •
Total Depth: 2161' FSL, 4409' FWL, Sec. 35, T12N, R13E, UM
10. Plug Back Depth(MD/TVD):
1B. Property Designation:
10205'/8778'
ADL 028280 & 028277 '
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11, Total Depth (MD/TVD):
19. DNR Approval Number:
Surface. x- 651959 . y- 5974667 - Zone - ASP 4 -
10850'/9082' -
87-035
TPI: x- 653847 y- 5978759 Zone- ASP
12, SSSV Depth(MD/TVD):
PO Thickness of Permafrost MDRVD:
Total Depth: x- 653863 y- 5979000 Zone - ASP 4
None
1900' (Approx.)
5. Directional or Inclination Survey: Yes ❑ (attached) No 0
13. Water Depth, if Offshore'
21. Re-onll/Lateral Top Window
Submit electronic and printed information per 20 AAC 25.050N/q
(ft MSL)
MDrtVD:
7483'/ 6735'
22, Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma my, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewaLaLBpGppQpVisa%r
Acronyms may be used. Attach a separate page if necessary 1!&.dj ii --161,- 86_: IpcgrE
MWD / OR / RES / DEN / NEU / Dipole Sonic / PWD, Sidewall Cores, MWD / GR / RES, RST
JUN 2 5 2019
23.
CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZEOUNT
CEMENTING RECORD PULLED
TOP
BOTTOM
TOP
BOTTOM
20"
30'
110'
30'
110'
13-3/8"
68#
LAO
30'
2688'
30'
2688'
17-1/2"
3723 cu 8 Permafrost
9-5/8"
47#
L -so
29'
7483'
29'
6735'
12-1/4"
2059 cu 8 Class'G'
7"
26#
L-80
7333'
10142'
6613'
6737'
8-1/2"
472 ou 8 UteCrele, 281 w 8 Class'G'
4-1/2"
12.6#
13crac
8493'
10850'
7506'
9082'
6-1/8"
236 cu 6 Claw 'G'
24. Open to production or injection? Yes ❑ No 0
25. TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
GRADEDEPTH SET (MD) PACKER SET (MD/TV
4-1/2" 12.8# 13Cr80 8021' 7974'17112'
Abdu,,
00UPWRINI
26. ACID, FRACTURE, CEMENT SQUEEZE ETC.
Was hydraulicfracturing used dunng completion? Yes 11No 0
Per 20 AAC 25.283 (i)(2) attach electronic and panted
information
/97A�.T��//y
VERIFIED
r JL �� /
--�L—
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
10205' Set Whipstock
27. PRODUCTION TEST
Date First Production: Not on Production
Method of Operation (Flowing, gas lift, etc.); N/A
Dare of Test::
Houn Tested::
Production for
Test Period —►
Oil-Bbi
Gas -MCF:
Water -Bbl:
Choke Size
Gas -Oil Ratio
Flow Tubing Casing Press: Calculated Oil -Bbl: Gas -MCF. Water -Bbl: Oil Gravity- API(corn:
Press 24 Hour Rate —.►
Forth 10-407 Revised 5/2017 CONTINUED ON PAGE 2 S ORIGINAL
Submit INAL only
R$DMS! L15&�, JUN 2 7 2019
28. CORE DATA Conventional Core(s) Yes ❑ No ® - Sidewall Cores Yes ❑ No 0
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29, GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No ® -
Permafrost- Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
10582'
8965' separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Sag River
10148'
8741'
Shublik
10228'
8792'
Sadlerochit - Zone 4B
10365'
8868'
Zone 4A
10467'
8916'
CGL - Zone 3
10582'
8965'
Base of CGL - Zone 2
10742'
9033'
Formation at total depth:
Zone 2
10742'
31. List of Attachments: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Hartley, Josephine
Authorized Title: SIM a list Contact Email: Josephine.Hartley@bp.com
Authorized Signature: INK IMate �/)-95/11 Contact Phone: +19075644570
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item Ia. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item ib. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Forth 10407 Revised 512017 Submit ORIGINAL Only
Daily Report of Well Operations
F -34B
ACTIVITYDATE SUMMARY
T/I/O = 2480/70/Vac. Temp = SI. IA FL (Slickline Request). IA FL @ Near Surface. ALP = 0
psi. SI @ CV.
12/22/2018
SV, WV, SSV = C. MV = O. IA, OA = OTG. 22:15
***WELL S/I ON ARRIVAL*** (ctd)
RIGGED UP SWCP 4518
12/22/2018
***WSR CONTINUED ON 12/23/18***
***WSR CONTINUED FROM 12/22/18*** (ctd)
DRIFTED w/ 20'x 3.70" DUMMY WHIPSTOCK, SAT DOWN HIGH IN DEVIATION @
10,192' SLM.
DRIFTED w/ 10'x 3.70" DUMMY WHIPSTOCK, SAT DOWN HIGH IN DEVIATION @
10,192' SLM.
DRIFTED w/ 3.70" CENTRAILIZER AND 2-1/2" SMPL BLR, SAT DOWN IN DEVIATION AT
10,652' SLM.
SET 4-1/2" CATCHER @ 7,994' SLM.
PULLED ST# 4 RK-DGLV FROM 4,975' MD.
PULLED ST# 5 RK-LGLV FROM 3,248' MD.
SET ST# 5 RK-DGLV @ 3,248' MD.
SET ST# 4 RK-DGLV @ 4,975' MD.
12/23/2018
***WSR CONTINUED ON 12/24/18***
T/1/0=1130/1080/0 Temp=S/I (LRS Unit 76 -Assist Slickline: Load & Test, CTD Screen)
Loaded IA w/ 3 bbls 60/40, 320 bbls Crude. S -Line set DGLV. Pumped 5.5 bbls crude down
IA and pressured IA to 500 psi to verify valve set.
12/23/2018
***Continued on 12/24/18 WSR***
***WSR CONTINUED FROM 12/23/18*** (ctd)
LRS PERFORMS 2,500 psi MIT -IA. (PASS)
PULLED 4-1/2" CATCHER FROM 7,994' SLM.
12/24/2018
***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE***
***Continued from 12/23/18 WSR*** (LRS Unit 76 -Assist Slickline: MIT -IA)
MIT -IA to 2616 psi **PASSED** (Max 2750, Target 2500) Pumped 12.8 bbls crude down IA
to achieve test pressure. 1st 15 min IA lost 101 psi. 2nd 15 min IA lost 18 psi, for a total oss
of 119 psi in 30 min. Pass per SL WSL Zac. Bled IAP. Bled back - 11 bbls.
SL in control of well upon LRS departure. Hung caution and info tags on IA/WV. AFE sign on
MV (Fluid Packed Annulus) IA/OA=OTG.
12/24/2018
FWHP's=1040/300/0
TWO = 1600/Vac/Vac. Temp = Sl. TBG FL (EL Request). ALP = 60 psi, SI @ CV. T FL @
4700'(71 bbls).
12/26/2018
SV, WV, SSV = C. MV = O. IA, OA = OTG. 08:45
***WELL SHUT-IN ON ARRIVAL*** (SLB E -LINE MILL XN / SET WHIPSTOCK)
INITIAL T/I/0 = 2600/75/75 PSI
LRS TO L&k WELL WITH 250 BBLS OF CRUDE.
RIH W/ MH22 (1-3/8 FN) / WELTEC MILL OAL=35', OAW=500#, MAX OD MILL=3.808"
12/31/2018
***JOB CONTINUED ON 1/1/19***
T/1/0=2600/0/0 Temp=Sl (LRS Unit 76 -Assist E -Line: Load & Kill, (CTD)
Pumped 5 bblsl 60/40 followed by 250 bbls crude at 5 BPM down TBG for load. E -Line in
control of well upon departure. CV's OTG
1/1/2019
FWHP=160/0/0.
Daily Report of Well Operations
F -34B
***JOB CONTINUED FROM 12/31/2018***
RIH W/ MH22 (1-3/8 FN) / WELTEC MILL OAL=35', OAW=500#, MAXOD=3.808"
MILL XN NIPPLE AT 8008', PERFORM DRY DRIFT. MILL MEASURES 3.808" AT
SURFACE
RIH W/ BKR WHIPSTOCK. OAL = 48', OAW = 575 LB, MAX OD = 3.63".
UNABLE TO PASS 10171' WITH WHIPSTOCK, POOH. PLAN TO SET WHIPSTOCK W/
RIG
TIE INTO SCHLUMBERGER MEMORY CNL DATED 31 -MAY -2005.
FINAL T/I/O = 100/75/75 PSI
1/1/2019
***JOB COMPLETE, WELL LEFT SHUT-IN ON DEPARTURE***
CTU#8 1.75" CT Job Scope: Drift/Log, Whipstock
MIRU CTU. Bullhead 320 bbis 1% kcl + safelube. MU & RIH with HES GR/CCL logging
carrier & Baker 3.77" drift bha. Log from 10,300' to 9,300'. Flag pipe at 10,100'. Pooh.
Recieve good data . Tie in to Baker Hughes RPM log dated 19 -Jun -2018. MU & RIH w/
3.77" Baker WS Anchor BHA & HES 24 arm caliper.
4/15/2019
***Continued on 4/16/19 WSR***
CTU #8 1.75" coil. Job Objective: Drift/Log, Set Whipstock (Pre CTD)
Resume RIH w/ Baker 3.77" WS Anchor bha w/ HES 24 arm caliper. Correct depth at flag.
Set ME of anchor at 10,219' elmd. Pooh. Recieve good data. Orientation at 304 degrees. MU
& RIH with 4-1/2" Whipstock Tray. Tag WS anchor. Confirm stung in to receptacle. Set 4-
1/2" Baker 2 -stage Whipstock at 10205TOWS, 30 degress LOHS. OAL = 18.48'. Pick off
clean. PUH to 2500'. Lay in 38 bbls of 60/40 methanol. Perform Weekly BOP test.
4/16/2019
***Job Complete***
T/l/O = 80/25/0. Temp = SI. MIT -T *** PASSED *** to 2561 psi (Pre Rig). ALP = 0 psi, SI @
casing valve. Tbg FL @ near surface. Pumped 1.3 bbis diesel down Tbg to achieve test
pressure. TP lost 33 psi in 1 st 15 mins & 6 psi in 2nd 15 mins for a total of 39 psi in 30 mins.
Bled TP from 2561 psi to 50 psi (1.5 bbls fluid) in 12 mins. MIT tags hung. Final WHPs =
50/25/0.
4/21/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 1230 hrs.
T/l/O = 80/30/0+. Temp = SI. WHPs (Post MIT). ALP = 30 psi, SI @ CV. TP increased 30
psi, IAP increased 5 psi, OAP increased 2 psi since 4/21/19.
4/23/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 02:50
T/I/O = 170/49/14. Temp = SI. Bleed WHPs (Pre Rig). ALP = 30 psi, SI @ CV. IA & OA FL
@ near surface. Bled OAP to BT from 14 psi to 0 psi in 1 min (Gas). Bled IAP to BT from 49
psi to 0 psi in 10 min (Gas). Bled ALP to 0 psi. Instructed by Valve shop to leave pressure on
TBG for TWC set. Monitored for 30 min. IAP increased 5 psi. Final WHPs = 170/5/0.
5/11/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 20:30
T/l/O = 170/47/14. Temp = SI. WHPs (Pre Rig). ALP = 50 psi, SI @ CV.
5/11/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:45
T/I/O = 170/130/10. Temp = SI. WHP's. (Post bleed). ALP = 0 psi & SI @ IA casing valve.
No change in TP, IAP increased 83 psi, OAP decreased 2 psi in 2 days.
5/13/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:00
T/1/0=100/0/0 Set 4" CIW "H" TWC #438 through tree. R/D 4" CIW production tree, installed
CDR tree Temp #4 and Kill line Temp #7. Torqued both flanges to API specs. PT'd tree
through kill line against TWC for shell test 300/low..5000/high... Pass. see "Field Charted
Tests" Pulled 4" CIW "H" TWC #438. R/D tree cap bonnet, installed blind with 90 jewelry.
PT'd through blind against Top of Swab 300/Iow..5000/high.. Pass. PT'd through kill line top of
5/15/2019 iMaster,
bottom of Swab 300/low..5000/hi h.. pass. FWP's 100/0/0 see log for details.
Daily Report of Well Operations
F -34B
TWO = VAC/50/20. Temp = SI. Bleed WHPs (Pre Rig). No wellhouse, flowline, or AL. CDR
tree installed. IA & OA FL @ near surface. Bled IAP from 50 psi to 0 psi in 10 minutes (all
gas). Held open bleed on IA for 30 minutes. Swapped to OA. Bled OAP from 20 psi to 0 psi
to BT in 5 minutes, held open bleed on OA for 30 minutes. Monitored for 30 minutes, TP,
IAP, and OAP unchanged. Final WHPs = VAC/0/0.
5/22/2019
SV, WV = C. MV = O. IA, OA = OTG. 05:00
TWO = VAC/12/07. Temp = SI. WHPs (Pre -Rig). No wellhouse, flowline, or AL. CDR tree
installed. TP unchanged, IAP increased 12 psi, OAP increased 7 psi since 5/22/19.
5/24/2019
SV, WV = C. MV = O. IA, OA = OTG. 01:00
TWO = VAC/20/10. Temp = SI. Bleed WHPs (Pre -RIG). NO wellhouse, flowline, AL or
scaffolding. CDR tree installed. IA & OA FL @ near surface. Bled IAP from 20 psi to 0 psi in
5 minutes to BT, all gas. Bled OAP from 10 psi to 0 psi in 2 minutes to BT, all gas.
Monitored for 30 minutes, IAP unchanged and OAP increased 1 psi. Final WHPs = VAC/0/1.
5/26/2019
SV, WV = C. MV = O. IA, OA = OTG. 03:00
North Arnenra - ALASKA - BP Page 1 Q&A5.
Operation Summary Report
Common Well Name: F-34 AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Dale: 5/28/2019 Eno Date'. 6/7/2019 X3-019CT-C: (2,401.556.00)
Project: PBU - Site: F
Rig Name/No.: CDR -2 Spud Date/Time: 10/7/1989 12:00:OOAM Rig Release: 6/13/2019
Active datum: KB @64.38usft (above Mean Sea Level)
Date From - To
Him
Task
Code NPT
Total Depth
Phase
Description of Operations
_
_(hr)
_
_ (usft)_
5/28/2019 16:00
- 19:00
3.00
MOB
P
PRE
PJSM FOR MOVING OFF WELL
-VERIFY 1Z'x 12" WHEEL CHOCK IN PLACE
PRIOR TO MOVING OFF WELL
- RADIO COMMUNICATION WILL BE VERIFIED
PRIOR TO MOVING OFF WELL
- DRILLER / RIG MANAGER WILLASSIGN
SPOTTER LOCATIONS PRIOR TO MOVING
OFF WELL
-AGREEMENT WILL BE MADE ON WHAT THE
COMMAND FOR "STOP" WILL BE PRIOR TO
MOVING OFF WELL.
'- ALL INVOLVED WILL BE MADE AWARE OF
NO TWC INSTALLED.
'JACK UPAND MOVE PITS. MOVE SUB OFF
,ALSO
19:00
- 19:30
0.50
MOB
P
PRE
PERFORM TEST RUN WITH WALKING FOOT.
GOOD
_.__
TEST
19:30
- 20:00
0.50
MOB
P
PRE
INSTALL BOTH JEEPS.
ATTACHED TRUCKING. PEAKHASTOSWAP
TRUCK _
20:00
- 21:30
1.50
MOB
N
PRE
WAIT ON TRUCKING
21:30
- 00:00
2.50
MOB
P
PRE
MOVE RIG TO F -PAD
5/29/2019 00:00
- 00:30
0.50
MOB
P
PRE
RIG ARRIVED LOCATION
L
00:30
- 04:00
3.50
MOB
P
PRE
PRE JOB SAFETY MEETING WITH CREW AND
TRUCK DRIVERS.
i
- EMPHASIS ON GOOD COMMUNICATION,
VERIFY STOP COMMAND.
- STOP BLOCK IN PLACE TO PREVENT RIG
FROM ROLLING BACKWARDS INTO WELL.
- VALVES ON TREE SHUT IN AND ALL
ANNULUS PRESSURES LESS THAN 50 PSI.
- DRILL SITE OPERATOR NOTIFIEDAND
DECLINED WITNESSING RIG MOVE OVER
WELL.
-ANYONE CAN STOP THE JOB AT
ANYTIME.BE WATCHFUL
- SPOT MAIN 8 PIT SUBS
"'RIG ACCEPTED AT 04:00"'
04:00
- 14:00
10.00
MOB
P
PRE
RIG UP CHECK LISTS
- LTT BETWEEN SWAB AND MASTER TO
3500# PASSED
- REMOVE TREE CAP AND NU BOPE AND MPL
- STAB INJECTOR, CHECK TREE BOLTS AND
SERVICE SWAB AND TANGO VALVES
- FLUID PACK COIL WITH 15 BBLS OF
METHANOL FOR THE TRIP IN THE HOLE
�-CONDUCT PJSM FOR TESTING BOPS
14:00
- 15:00
1.00
BOPSUR
P
PRE
LINE UP VALVES AND PUMP AND PURGE AIR
FROM SYSTEM.
CONDUCTS HELL TEST OF BOPS.
15:00
- 15:30
0.50
BOPSUR
P
PRE
CONDUCT RIG EVAC DRILLAND AAR WITH
BEARD CREW.
_
CONDUCT PRE -SPUD.
1530
- 17'.00
1.50
BOPSUR
P
PRE
LINE UP VALVES FOR BOP TEST #1.
FLUID PACK LINES. REVIEW PROCEDURE.
Printed 625/2019 10:04:59AM "All depths reported in Drillers Depths"
North America -ALASKA - BP
Operation Summary Report
Common Well Name: F-34
AFE No
Event Type: RE-ENTER- ONSHORE (RON) Start Date: 5/28/2019 End Date. 6/7/2019 X3-019CT-C: (2,401,556.00)
Project: PBU Site: F
Page 2 ORS
Kig Name/NO.: CUK-Z
Spud Date/Time: 1017/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI: USA00000752
Active datum KB @64.38usft (above
Mean Sea Level)
Date From - TO
Hrs
Task Code NPT Total Depth
Phase Description of Operations
(hr)
(usft)
_
17:00 - 23:00
6.00
BOPSUR P
PRE TEST ROPE AS PER AOGCC AND BP
GUIDELINES.
ALL TESTS TO 250 / 3500 PSI.
TEST IS WITNESSED BY AOGCC REP ADAM
EARL, WSLAND TOOLPUSHER.
TEST 1: IRV, STRIPPER, C9, C10
BACKWARDS - PASS
'TEST 2: BLIND / SHEARS, R1, BL1A, 81, B4
R1 FAILED. MOVE ON TO TEST LATER
TEST 3: ANNULAR (2-3/8"), TIW#1, B3, B2,
BL1 PASS
TEST 4: UPPER 2-3/8" PIPE/ SLIP, TI W #2,
BL2, R2, T2, C15 PASS
TEST 5: Cl5, Ti, Cll PASS
TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2
PASS
j
TEST 7: LOWER 2-3/8" PIPE / SLIP, C5, C6, Ce,
'TVI PASS RETEST RI AFTER GREASE/
CYCLE. FAIL/PASS
TEST 8: CHOKE A, CHOKE PASS
PERFORM ACCUMULATOR DRAW DOWN
TEST
INSTALL SAVER SUB
TEST 9: ANNULAR (3-1/2")Cl, C4 PASS
'ANNULAR FAIL/ PASS
TEST 10: VARIABLES (3-1/2") C2, C3 PASS
23:00 - 00:00
1.00
RIGD P I
PRE PULLTESTJOINT. REMOVE TEST RISERS
MAKE UP DRILLING RISERS. INSTALLING
_
___FLOATS IN UQC
5/30/2019 00:00 - 01:30
1.50
RIGID P
PRE INSTALL FLOATS
STAB INJECTOR ON TO WELL
PRESSURE TEST FLOATS AND DRILLING
LUBRICATORS TO 3500#.
01:30 - 02:00
0.50
RIGID P
PRE PRE SPUD WITH WARDS CREW
DETAILED DISCUSSION AROUND 12S
PROCEDURE WITH WARDS CREW.
02:00 - 03:00
1.00
STWHIP P
WEXIT OPEN WELLBORE UPAGAINSTCLOSED
CHOKE. FLOW CHECK
MAKEUP WINDOW MILLING BHA WHILE
FLOW CHECKING WELLBORE. WELL STATIC
RUN BHA#1 IN HOLE. MAKEUP INJECTOR.
INJECTOR ON: 02:45
03:00 - 06:30
3.50
STWHIP P
WEXIT RIH WITH 3.80" WINDOW MILLING BHA#1
- RATE: 0.39 BPM IN, 0.83 BPM OUT. CIRC
PRESSURE: 113 PSI
- MUD WEIGHT: 8.31 PPG IN, 7.37 PPG OUT.
TAKING INITIAL ENTRY FLUIDS TO TIGER
TANK
- GR TIE IN TO HOT FOR OUR TOOLS. PU TO
9,200'. SWAP TO CCL MODE.
- LOG CCL DOWN TO LIGHT TAG WHIPSTOCK
AT 10225' UNCORRECTED.
06.30 - 10:00
3.50
STWHIP P
WEXIT PICK UP OFF WHIPSTOCKAND CIRCULATE
WELL TO KCL THEN TO MUD.
TIE-IN CCL LOG WHILE CIRCULATING.
CORRECT -16 FT.
Printed 6/25/2019 10:04:59AM "All depths reported in Drillers Depths"
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
North America - ALASKA - BP
Page 3 oM
Operation Summary Report
Common Well Name: F34
AFE No
Event Type: RE-ENTER- ONSHORE
(RON) Start Date: 5/28/2019 End Date. 6ll/2019
X3-019CT-C (2,401,556,00)
Project: PBU
Site: F
Rig Name/No.: CDR -2
Spud Date/Time: 10/7/1989 12:00:OOAM
Rig Release: 6/13/2019
Rig Contractor: NABORS ALASKA DRILLING INC.
BPUOI. USA00000752
Active datum: KB Q84.38usR (above
Mean Sea Level)
Date From - To
Hrs Task Code NPT Total Depth Phase
Description of Operations
(hr). _ (usR)
10:00 - 10:30
0.50 STWHIP P WEXIT
WITH MUD AT SURFACE, PURGE CT RISER
OUT TO TIGER TANK THEN BRING RETURNS
BACK TO PITS,
CLOSE EDC, 10 MIN FLOW CHECK IS GOOD.
GO TO FULL RATE, EASE DOWN FOR LIGHT
TAG AT PINCH POINT.
10,30 - 12:30
StA
2.00 STWHIP P WEXIT
MILL 3.80" WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 10208.35' MD TO 10210.2'
�J
F2��
MD
- RATE: 2.86 BPM IN, 2.87 BPM OUT
- MUD WEIGHT: 8.71 PPG IN, 8.61 PPG OUT
- DWOB: 1-3 KLBS
-CIRC PRESSURE'. 3380 PSI
12:30 - 14:50
2.33 STWHIP P WEXIT
MILL 3.80" WINDOW IN 41/2" CASING PER
BAKER REP FROM 10210.2' MD TO 10211.4'
MD
-- DROP RATE TO 2.5 BPM DUE TO VIBRATION
- RATE: 2.51 BPM IN, 2.52 BPM OUT
- MUD WEIGHT: 8.69 PPG IN, 8.61 PPG OUT
-DWOB: 34 KLBS
- CIRC PRESSURE: 3180 PSI
BLEED OA FROM 800 TO 200 PSI.
14:50 - 18:00
3.17 STWHIP P T WEXIT
MILL 3.80" WINDOW IN 4-1/2" CASING PER
BAKER REP FROM 10211.4' MD TO 102XX' MD
- DROP RATE TO 2.3 BPM DUE TO VIBRATION
- RATE: 2.31 BPM IN, 2.32 BPM OUT
- MUD WEIGHT: 8.69 PPG IN, 8.60 PPG OUT
- DWOB: 34 KLBS
-CIRC PRESSURE: 2870 PSI
- MOVE RATE BACK UP TO 2.5 BPM WHEN
- -
_
VIBRATION LEVELS FALL ENOUGH.
18:00 - 00:00
6.00 STWHIP P 10,216.43 WEXIT
_
MILL 3.80" WINDOW IN 4-1/2" CASING PER
BAKER REP
- MANIPULATE RATES BETWEEN 2.4-2.8 BPM
TO ATTEMPT TO MINIMIZE VIBRATION
- RATE: 2.78 BPM IN, 2.80 BPM OUT
- MUD WEIGHT: 8.69 PPG IN, 8.60 PPG OUT
- DWOB: 4 KLBS
-CIRC PRESSURE: 3337 PSI
- VIBRATIONS RUNNING IN THE 2'S
- JUST PRIOR TO MIDPOINT, BEGIN HAVING
TO PLAY WITH RATES TO KEEP IN THE 3'S
WOB CARRYING AT 44.2K
5/31/2019 00:00 - 00:30
0.50 STWHIP P 10,21643 WEXIT
WINDOW MILL EXITED
00:30 - 03:30
3.00 STWHIP P 10,227 00 WEXIT
MILL 3.80° WINDOW IN 4-1/2" CASING
- RATE: 2.54 BPM IN, 2.54 BPM OUT
- MUD WEIGHT: 8.68 PPG IN, 8.59 PPG OUT
-DWOB: 34 KLBS
- CIRC PRESSURE: 3111 PSI
- DRILL RATHOLE 7O 1.0227'. LET DRILL OFF
03:30 - 04:00
0.50 STWHIP P 10,227.00 WEXIT
REAMING PASSES
- REAMING PASSES SHOWED MINIMAL
MOTOR WORK. CLEAN PASSES.
-COME OFFLINE. DRY DRIFT WINDOW TO
TD. NO ISSUES
-PAINT YELLOW FLAG AT 10206' ( 10147.29'
EOP)
-OPEN EDC
Printed 6/25/2019 10:04:59AM **All depths reported in Drillers Depths"
TRE£= 4-1/16"01W
WELLHEAD=
13-518'CIW
ACTUATOR=
BAKER
OKB. ELEV =
65.64'
REF ELEV =
64.38'
BE ELEV =
35.67'
KOP = _- —
7500'
Max Angle =
65° @ 10652'
Datum MD=
10356'
Datum TVD=
88001SS
13-38'
Minimum ID = 3.808" @ 8008'
4-112" HES XN NIP MILLED
WHIPSTOCK (04/16/05) 7478'
¢SV ( 04/16/05) 7606'
PERFORATION SUMMARY
REF LOG: MWD DR1GR/RM ON 0425105
ANGLEATTOP Pf3RF: 65 @ 10636
Note: Refer to Production DB for historical perf data
F 34 B SAFETY NOTE: PARENT WELLBORE NOT SHOWN
BELOW WHIPSTOCK "'4 -12 -CHROME TBG&
LNR''
2�9� 4-12" FBS X NP. ID = 3.813'
GAS LIFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
LATCH
PORT
DATE
5
3248
3244
13
MNG
DMY
RK
0
12/24/18
4
4975
4741
33
MMG
DAM
RK
0
12124/18
3
6035
5588
40
MVIG
DMY
RK
0
04127/05
2
7059
6391
37
MMR'
DMY
RK
0
04/27/05
1
7884
7043
40
KGB2
DMY
RIC
0
04/27105
7333- 9-58" X 7" BKR C-2 ZXP LTP,
w I HMC LNR HGR, D = 6.30"
MLLOUT WMDOW (F348) 7483' - 7500'
FES X W. D =
' -- 12-HE3SXNP,D=3.813'
BOOS' 4-12' HES XN NP MILLED TO
3.808' (01/01/19)
r3'_Jj T X 5' BKRZXP LTP
w/FMC LNR ff)=4.42"
8517 5- X 4-12' XO,
D = 3.950'
TBG, 12.6#, 8021' \
90, VAM TOP,
)pf, D = 3.958'
LNR, 26#, L-80, BTC -M, 10142'
183 bpf, D = 6.276'
® 10762'
DATE REV BY COMMENTS
DATE I REV BY I COMMENTS
102388 ORIGINAL COMPLETION
11119/18 JMD MNORCORRECTDN
07MMS SRB SIDETRACK(F-34A)
1129/18 JNUJMD ADDED REF & BF ELEV
04MMS N2ES SIDETRACK(F-34B)
01/03/19 BTNJMD MILLED XN NIPPLE 01/01/19
06101/05 JAFITH- PERFORATIONS
01/03/19 GJB/JMD GLV C/O(1223/18)
0528/07 JAF/PJC DRLGDRAFTCORRECTIONS
0420/19 S/JMD 1VN PSTOCK SET 04/16/19
03=18 DGIJMD PLLLED SLP STOP & BP GAUGE
PIP TAG
PRUDHOE BAY UNIT
WELL: F34B
PERMIT No: `2050530
API No: 50-029-21980-02
fi 1 N. R1 3E. 213T FNL & 2413
BP Exploration (Alaska)
· .
Image Project Well History File Cover Page
XHVlE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
c2 QS - 05:3 Well History File Identifier
Production Scanning
Stage 1 Page Count from Scanned File: S~ (Count does include coy? sheet)
Page Count Matches Number in Scanning Preparation: V YES
Date: 1//0/07
Organizing (done)
o Two-sided 11I111111111I111111
RES CAN
~olor Items:
o Greyscale Items:
DIGITAL DATA
~skettes, No. I
o Other, NolType:
o Poor Quality Originals:
o Other:
NOTES:
Date 7 j;Ó/07
Date 1 lID/ 07
I X 30 = 30
Date 7 / I 0 / 0 7
BY:
~
Project Proofing
BY:
~
Scanning Preparation
BY:
~
BY:
~
Stage 1
If NO in stage 1, page(s) discrepancies were found:
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Maria
Date:
Comments about this file:
o Rescan Needed 11/1111111111111111
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Logs of various kinds:
o Other::
(\1P
151
1111111111111111111
151
vYlP
+ ~7 = TOTAL PAGES 57
J;ount does not include cover sheet) nA.f
151 , ,. ~
III II 111111 "' "III
NO
YES
151 ~ f
NO
151
11111111111I1111111
11I11111111 "' "III
151
Quality Checked
11/111/11111 111111I
10/6/2005 Well History File Cover Page.doc
•
gy data
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N
Houston, Texas 77043
713/461-3146
Fax: 713/461-0920
October 31, 2007
i
~~~~~ V
~vov~ ~ ~ 2o~r
;~faska Oi! &r Gas Cons, ~t~trtttnissior~
Anchorage
State of Alaska - AOGCC
Attn: Christine Mahnken ,,~`~ ~~~' ~' ~ ~~~ ~~~
333 W. 7th Ave, Suite 100 ®~ `~
Anchorage, Alaska 99501
Re: F-P'ad, We11 #F-34B
Prudhoe Bay, Alaska
Enclosed, please find two (2) copies, and one (1) disk of the completed survey
for the above referenced welt.
We would like to take this opportunity to thank you for using Gyrodata,. and we
look forward to serving you in the future.
Sincerely,
~~ ~~
p ~~~
Rob Shou L
North American Regional Manager
RS:tf
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gy data
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N.
Houston, Texas 77043
713/461-3146
Fax: 713!461-0920
SURVEY REPORT
BP
F Pad #F-34B
Prudhoe Bay, AK
AK1007G_555
22 Oct 2007
•
Serving the Worldwide Energy 4ndustry with Precision Survey Instrumentation
v S ~5
A Gyrodata Directional Survey
for
BP EXPLORATION (ALASKA)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
Run Date: 22 Oct 2007
Surveyor: Michael Villarreal
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.200000 deg. N
Azimuth Correction:
Gyro: Bearings are Relative to True North
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
•
•
Horizontal Coordinates Calculated from Local Horizontal Reference
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, S" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH
DEPTH
feet deg. deg.
A Gyrodata Directional Survey
BORE HOLE
BEARING
deg. min.
DOGLEG
SEVERITY
deg.!
100 ft.
VERTICAL
DEPTH
feet
CLOSURE
DIST. AZIMUTH
feet deg.
0.00 0.00 0.00 N 0 0 E 0.00 0.00
0 - 10587 FT. RATE GYROSCOPIC MULTISHOT SURVEY RUN INSIDE 5" TUBING
ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO WELLHEAD
0.0 0.0
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
100.00 0.18 223.41 S 43 24 W 0.18 100.00 0.2 223.4 0.12 S 0.11 W
200.00 0.19 227.85 S 47 51 W 0.02 200.00 O.S 224.9 0.34 S 0.34 W
300.00 0.20 229.95 S 49 57 W 0.01 300.00 0.8 226.6 0.56 S 0.59 W
400.00 0.25 237.85 S S7 51 W 0.06 400.00 1.2 229.1 0.79 S 0.91 W
500.00 0.34 258.68 S 78 41 W 0.14 500.00 1.7 235.2 0.96 S 1.38 W
600.00 0.34 256.41 S 76 24 W 0.01 599.99 2.2 241.0 1.09 S 1.96 W
700.00 0.33 262.54 S 82 33 W 0.04 699.99 2.8 244.8 1.20 S 2.54 W
800.00 0.25 270.41 N 89 36 W 0.09 799.99 3.3 247.9 1.23 S 3.04 W
900.00 0.19 298.29 N 61 43 W 0.12 899.99 3.6 251.3 1.15 S ~ 3.40 W
1000.00 0.15 281.56 N 78 26 W 0.06 999.99 3.8 254.1 1.05 S 3.67 W
1100.00 0.09 276.45 N 83 33 W 0.06 1099.99 4.0 255.4 1.01 S 3.89 W
1200.00 0.09 250.46 S 70 27 W 0.04 1199.99 4.2 255.7 1.03 S 4.04 W
1300.00 0.04 184.81 S 4 49 W 0.09 1299.99 4.3 255.1 1.10 S 4.12 W
1400.00 0.13 113.74 S 66 16 E 0.13 1399.99 4.2 253.6 1.18 S 4.02 W
1500.00 0.21 106.24 S 73 46 E 0.08 1499.99 3.9 2S 1.1 1.28 S 3.74 W
1600.00 0.30 107.33 S 72 40 E 0.09 1599.99 3.6 246.9 1.41 S 3.31 W
1700.00 0.47 91.21 5 88 47 E 0.20 1699.99 3.0 240.4 1.50 S 2.64 W
1800.00 0.45 78.54 N 78 33 E 0.10 1799.98 2.3 232.1 1.43 S 1.84 W
1900.00 0.50 81.99 N 81 S4 E 0.05 1899.98 1.6 218.4 1.29 S 1.02 W
2000.00 0.44 106.21 S 73 48 E 0.20 1999.98 1.4 189.5 1.34 S 0.22 W
2
•
•
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg.( feet feet deg. feet
100 ft.
2100.00 0.18 147.91 S 32 6 E 0.33 2099.98 1.6 171.7 1.58 S 0.23E
2200.00 0.17 164.37 S 15 38 E 0.05 2199.97 1.9 169.2 1.86 S 0.36 E
2300.00 0.22 141.62 S 38 23 E 0.09 2299.97 2.2 166.6 2.15 S 0.51 E
2400.00 0.42 131.68 S 48 19 E 0.21 2399.97 2.7 160.5 2.54 S 0.90 E
2500.00 0.37 119.23 S 60 46 E 0.10 2499.97 3.3 153.7 2.94 S 1.45 E
2600.00 0.39 86.28 N 86 17 E 0.22 2599.97 3.7 146.0 3.07 S 2.07 E
2700.00 0.45 47.85 N 47 51 E 0.28 2699.97 3.9 135.8 2.78 S 2.71 E
2800.00 1.67 3.97 N 3 58 E 1.38 2799.95 3.3 109.0 1.07 S 3.10 E
2900.00 3.75 10.17 N 10 10 E 2.10 2899.83 5.2 46.3 3.61. N 3.78 E
3000.00 7.21 18.64 N 18 39 E 3.55 2999.36 14.3 26.5 12.77 N 6.36 E
3100.00 10.12 20.92 N 20 55 E 2.93 3098.21 29.3 23.1 26.93 N 11.51 E
3200.00 11.95 23.75 N 23 45. E 1.91 3196.36 48.4 22,9 44.61 N 18.81 E
3300.00 13.91 28.65 N 28 39 E 2.25 3293.82 70.7 24.0 64.64 N 28.75 E
3400.00 16.07 28.85 N 28 51 E 2.16 3390.41 96.5 25.3 87.31 N 41.20 E
3450.00 17.23 28.90 N 28 54 E 2.32 3438.31 i 10.8 25.7 99.86 N 48.11 E
3475.00 17.97 28.95 N 28 57 E 2.96 3462.14 118.4 25.9 106.48 N 51.77E
3500.00 18.70 29.09 N 29 5 E 2.92 3485.87 126.2 26.1 113.35 N 55.59 E
3525.00 19.38 29.28 N 29 17 E 2.73 3509.50 134.4 26.3 120.47 N 59.5b E
3550.00 20.18 29.52 N 29 31 E 3.22 3533.03 142.8 26.5 127.84 N 63.72 E
3575.00 20.70 29.78 N 29 47 E 2.11 3556.45 151.6 26.7 135.43 N 68.04 E
3600.00 21.66 30.00 N 30 0 E 3.85 3579.77 160.6 26.9 143.26 N 72.54 E
3625.00 22.41 30.14 N 30 8 E 3.01 3602.94 169.9 27.0 151.38 N 77.24 E
3650.00 23.30 30.20 N 30 12 E 3.56 3625.98 179.6 27.2 159.77 N 82.12 E
3675.00 24.18 30.19 N 30 12 E 3.52 3648.86 189.7 27.4 168.47 N 87.18 E
3
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
3700.00 24.87 30.08 N 30 5 E 2.77 3671.b1 200.1 27.5 177.45 N 92.39 E
3725.00 25.75 29.79 N 29 48 E 3.55 3694.21 210.7 27.6 186.71 N 97.72 E
3750.00 26.69 29.36 N 29 22 E 3.84 3716.63 221.8 27.7 196.31 N 103.17 E
3775.00 27.71 28.93 N 28 56 E 4.15 3738.87 233.2 27.8 206.29 N 108.74 E
3800.00 28.61 28.67 N 28 40 E 3.63 3760.91 245.0 27.8 216.63 N 114.42 E
3825.40 29.32 28.60 N 28 36 E 2.84 3782.78 257.1 27.9 227.26 N 120.23 E
3850.00 30.30 28.63 N 28 38 E 3.92 3804.47 269.5 27.9 238.17 N 126.18 E
3875.00 30.90 28.67 N 28 40 E 2.40 3825.99 282.3 27.9 249.34 N 132.28 E
3900.00 31.39 28.70 N 28 42 E 1.96 3847.39 295.2 28.0 260.68 N 138.49 E
3925.00 32.00 28.75 N 28 45 E 2.44 3868.66 308.3 28.0 272.20 N 144.80 E
3950.00 32.53 28.82 N 28 49 E 2.12 3889.80 321.7 28.0 283.90 N 151.22 E
3975.00 33.41 28.84 N 28 50 E 3.52 3910.77 335.3 28.1 295.81 N 157.78 E
4000.00 33.94 28.79 N 28 48 E 2.12 3931.58 349.1 28.1 307.96 N 164.46 E
4025.00 34.43 28.74 N 28 45 E 1.96 3952.26 363.2 28.1 320.27 N 171.23 E
4050.00 34.87 28.74 N 28 45 E 1.76 3972.82 377.4 28.2 332.74 N 178.06 E
4075.00 34.50 28.80 N 28 48 E 1.48 3993.38 391.6 28.2 345.21 N 184.91 E
4100.00 34.48 28.85 N 28 51 E 0.15 4013.99 405.8 28.2 357.61 N 191.73 E
4125.00 34.57 28.87 N 28 52 E 0.36 4034.58 419.9 28.2 370.02 N 198.57 E
4150.00 34.73 28.88 N 28 53 E 0.64 4055.15 434.1 28.2 382.46 N 205.44 E
4175.00 34.96 28.92 N 28 55 E 0.92 4075.67 448.4 28.3 394.97 N 212.34 E
4200.00 34.83 28.97 N 28 58 E 0.53 4096.17 462.7 28.3 407.48 N 219.26 E
4225.00 34.67 28.99 N 29 0 E 0.64 4116.71 477.0 28.3 419.95 N 226.17 E
4250.00 34.67 28.97 N 28 58 E 0.05 4137.27 491.2 28.3 432.39 N 233.06 E
4275.00 34.54 28.92 N 28 55 E 0.53 4157.85 505.4 28.3 444.81 N 239.93 E
4
•
•~
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
4300.00 34.33 28.87 N 28 52 E 0.85 4178.47 519.5 28.4 457.19 N 246.76 E
4325.00 34.47 28.87 N 28 52 E 0.56 4199.10 533.7 28.4 469.56 N 253.58 E
4350.00 34.48 28.91 N 28 55 E 0.10 4219.71 547.8 28.4 481.95 N 260.42 E
4375.00 34.55 28.97 N 28 58 E 0.32 4240.31 562.0 28.4 494.35 N 267.27 E
4400.00 34.27 29.03 N 29 2 E 1.13 4260.93 576.1 28.4 506.70 N 274.12 E
4425.00 34.19 29.05 N 29 3 E 0.32 4281.60 590.2 28.4 519.00 N 2$0.95 E
4450.00 34.03 29.04 N 29 2 E 0.64 4302.30 604.2 28.4 531.25 N 287.75 E
4475.00 33.99 29.02 N 29 1 E 0.17 4323.03 618.2 28.5 543.48 N 294.54 E
4500.00 33.43 29.02 N 29 1 E 0.24 4343.7b 632.1 28.5 555.69 N 301.31 E
4525.00 33.98 29.05 N 29 3 E 0.21 4364.50 646.1 28.5 567.90 N 308.09 E
4550.00 34.19 29.08 N 29 5 E 0.84 4385.20 660.1 28.5 580.15 N 314.90 E
4575.00 33.83 29.10 N 29 6 E 1.44 4405.93 674.1 28.5 592.37 N 321.70 E
4600.00 33.71 29.12 N 29 7 E 0.48 4426.71 688.0 28.5 644.51 N 328.46 E
4625.00 33.81 29.12 N 29 7 E 0.40 4447.49 701.9 28.5 616.64 N 335.22 E
4650.00 33.75 29.11 N 29 7 E 0.24 4468.27 715.8 28.5 628.79 N 341.98 E
4675.00 33.74 29.07 N 29 4 E 0.10 4489.Ob 729.7 28.6 640.92 N 348.73 E
4700.00 33.60 29.01 N 29 1 E 0.57 4509.87 743.5 28.6 653.04 N 355.46 E
4725.00 33.49 29.01 N 29 0 E 0.44 4530.70 757.3 28.6 665.12 N 362.16 E
4750.00 33.SS 29.10 N 29 b E 0.31 4551.54 771.1 28.6 677.19 N 368.86 E
4775.00 33.42 29.26 N 29 15 E 0.63 4572.40 784.9 28.6 689.24 N 375.59 E
4800.00 .33.31 29.39 N 29 24 E 0.53 4593.28 798.7 28.6 701.22 N 382.32 E
4825.00 33.25 29.44 N 29 26 E 0.26 4614.18 812.4 28.6 713.17 N 389.06 E
4850.00 33.30 29.42 N 29 25 E 0.20 4635.08 826.1 28.6 725.12 N 395.80 E
4875.00 33.16 29.39 N 29 23 E 0.56 4655.99 839.8 28.6 737.05 N 402.53 E
5
•
•
A Gyrodata Directional Survey
BP Exploration ( Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Sob Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZON TAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
4900.00 33.23 29.37 N 29 22 E 0.28 4676.91 853.5 28.7 748.98 N 409.24 E
4925.00 32.96 29.36 N 29 22 E 1.08 4697.85 867.1 28.7 760.88 N 415.93E
4950.00 32.82 29.38 N 29 23 E 0.56 4718.85 880.7 28.7 772.71 N 422.59 E
4975.00 33.00 29.43 N 29 26 E 0.73 4739.83 894.3 28.7 784.54 N 429.26 E
5000.00 32.79 29.45 N 29 27 E 0.84 4760.83 907.9 28.7 796.37 N 435.94 E
5025.00 32.99 29.39 N 29 23 E 0.81 4781.82 921.5 28.7 808.19 N 442.60 E
5050.00 33.23 29.29 N 29 18 E 0.98 4802.76 935.1 28.7 820.10 N 449.29 E
5075.00 32.84 29.27 N 29 16 E 1.56 4823.72 948.7 28.7 831.98 N 455.96 E
5100.00 32.87 29.31 N 29 19 E 0.15 4844.72 962.3 28.7 843.81 N 462.60 E
5125.00 32.56 29.28 N 29 17 E 1.24 4865.75 975.8 28.7 855.60 N 469.21 E
5150.00 32.30 29.11 N 29 6 E 1.10 4886.85 989.2 28.7 867.30 N 475.75 E
5175.00 32.43 28.90 N 28 54 E 0.69 4407.97 1002.6 28.7 879.00 N 482.24 E
5200.00 32.63 28.78 N 28 47 E 0.84 4929.05 1016.0 28.8 890.78 N 488.72E
i
5225.00 33.02 28.76 N 28 45 E 1.56 4950.06 1029.6 28.8 902.66 N 495.24E ~!
5250.00 33.33 28.73 N 28 44 E 1.24 4970.98 1043.3 28.8 914.65 N 501.82E
5275.00 33.74 28.66 N 28 40 E 1.65 4991.82 1057.1 28.8 926.77 N 508.45E
5300.00 34.02 28.59 N 28 36 E 1.13 5012.57 1071.0 28.7 939.00 N 515.13E ~ ~
5325.00 34.40 28.54 N 28 32 E 1.52 5033.25 1085.1 28.7 951.35 N 521.85E
5350.00 34.74 28.47 N 28 28 E 1.37 5053.84 1099.3 28.7 963.81 N 528.62E
5375.00 35.07 28.42 N 28 25 E 1.32 5074.34 1113.6 28.7 976.39 N 535.43E 'I
5400.00 35.75 28.53 N 28 32 E 2.73 5094.71 1128.0 28.7 989.12 N 542.34E
5425.00 36.36 28.80 N 28 48 E 2.52 5114.92 1142.8 28.7 1002.03 N 549.40E j
5450.00 37.23 29.11 N 29 6 E 3.56 5134.94 1157.7 28.7 1015.14 N 556.64E
5475.00 37.96 29.33 N 29 20 E 2.97 5154.75 1173.0 28.7 1028.45 N 564.09E ~
6
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
5500.00 38.43 29.44 N 29 27 E 1.90 5174.40 1188.4 28.8 1041.92 N 571.67 E
5525.00 39.01 29.48 N 29 29 E 2.32 5193.91 1204.1 28.8 1055.53 N 579.37 E
5550.00 39.27 29.44 N 29 27 E 1.04 5213.30 1219.9 28.8 1069.27 N 587.13 E
5575.00 39.50 29.44 N 29 26 E 0.92 5232.62 1235.7 28:8 1083.09 N 594.93 E
5600.00 39.86 29.64 N 29 38 E 1.53 5251.86 1251.7 28.8 1096.97 N 602.80 E
5625.00 39.85 30.05 N 30 3 E 1.05 5271.05 1267.7 28.8 1110.87 N 610.77 E
5650.00 39.48 30.36 N 30 21 E 1.67 5290.29 1283,7 28.8 1124.66 N 618.80 E
5675.00 40.41 30.24 N 30 14 E 3.73 5309.46 1299.7 28.8 1138.52 N 626.89 E
5700.00 39.49 29.80 N 29 48 E 3.85 5328.63 1315.8 28.9 1152.42 N 634.93 E
5725.00 39.42 29.48 N 29 29 E 0.86 5347.93 1331.6 28.9 1166.23 N b42.78 E
5750.00 40.18 29.49 N 29 29 E 3.04 5367.14 1347.6 28.9 1180.16 N 650.66 E
5775.00 39.45 29.55 N 29 33 E 2.92 5386.34 1363.6 28.9 1194.09 N 658.55 E
5800.00 38.56 29.34 N 29 20 E 3.60 5405,77 1379.4 28.9 1207.79 N 666.28 E
5825.00 38.60 28.94 N 28 56 E 1.01 5425.31 1395.0 28.9 1221.41 N 673.87 E
5850.00 38.89 28.70 N 28 42 E 1.31 5444.81 1410.6 28.9 1235.11 N 681.42 E
5875.00 38.85 28.72 N 28 43 E 0.17 5464.27 1426.3 28.9 1248.87 N 688.95 E
5900.00 39.10 28.74 N 28 44 E 1.00 5483.71 1442.0 28.9 1262.66 N 696.51 E
5925.00 39.20 28.55 N 28 33 E 0.61 5503.10 1457.8 28.9 1276.52 N 704.08 E
5950.00 39.19 28.29 N 28 17 E 0.67 5522.47 1473.6 28.9 1290.41 N 711.60 E
5975.00 39.55 28.16 N 28 9 E 1.48 5541.80 1489.5 28.9 1304.38 N 719.10 E
6000.00 39.65 28.13 N 28 8 E 0.40 5561.06 1505.4 28.9 1318.43 N 726.61 E
6025.00 39.88 28.03 N 28 2 E 0.95 5580.28 1521.4 28.9 1332.54 N 734.14 E
6050.00 40.02 27.79 N 27 47 E 0.85 5599.44 1537.4 28.8 1346.73 N 741.65 E
6075.00 39.69 27.48 N 27 29 E 1.53 5618.63 1553.5 28.8 1360.92 N 749.09 E
7
•
•
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
6100.00 40,37 27.22 N 27 13 E 2.80 5637.78 1569.5 28.8 1375.20 N 756.47 E
6125.00 39.76 26.98 N 26 S9 E 2.52 5656.91 1585.6 28.8 1389.53 N 763.80 E
6150.00 38.96 26.77 N 26 46 E 3.24 5676.24 1601.5 28.8 1403.67 N 770.97 E
6175.00 40.12 26.67 N 26 40 E 4.65 5695.52 1617.4 28.8 1417.89 N 778.12 E
6200.00 40.01 26.71 N 26 42 E 0.45 5714.65 1633.4 28.7 1432.26 N 785.35 E
6225.00 38.74 26.84 N 26 51 E 5.09 5733.97 1649.3 28.7 1446.42 N 792.50 E
6250.00 39.96 27.02 N 27 1 E 4.90 5753.31 1665.1 28.7 1460.56 N 799.68 E
6275.00 40.18 27.21 N 27 12 E 1.00 5772.44 1681.2 28.7 1474.88 N 807.01 E
6300.00 38.69 27.35 N 27 21 E 5.97 5791.75 1697.1 28.7 1488.99 N 814.29 E
6325.00 39.61 27.41 N 27 25 E 3.68 5811.13 1712.9 28.7 1503.01 N 821.55 E
6350.00 40.16 27.41 N 27 24 E 2.20 5830.32 1728.9 28.6 1517.24 N 828.93 E
6375.00 38.73 27.46 N 27 28 E 5.72 5849.62 1744.8 28.6 1531.34 N 836.24 E
6400.00 39.59 27.59 N 27 35 E 3.45 5869.01 1760.6 28.6 1545.34 N 843.54 E
6425.00 39.87 27.65 N 27 39 E 1.13 5888.23 1776.6 28.6 1559.50 N 850.95 E
6450.00 38.59 27.55 N 27 33 E 5.13 5907.60 1792.4 28.6 1573.51 N 858.27 E
6475.00 38.55 27.44 N 27 26 E 0.33 5927.14 1807.9 28.6 1587.33 N 865.47 E
6500.00 39.36 27.43 N 27 26 E 3.24 5946.59 1823.7 28.6 1601.28 N 872.71 E
6525.00 38.95 27.46 N 27 27 E 1.64 5965.97 1839.4 28.6 1615.29 N 879.98 E
6550.00 37.91 27.38 N 27 23 E 4.16 5985.55 1855.0 28.6 1629.09 N 887.14 E
6575.00 38.04 27.26 N 27 15 E 0.60 6005.26 1870.4 28.6 1642.75 N 894.20 E
6600.00 38.62 27.28 N 27 17 E 2.32 6024.87 1885.9 28.6 1656.54 N 901.30 E
6625.00 38.58 27.46 N 27 28 E 0.48 6044.41 1901.5 28.5 1670.39 N 908.47 E
6650.00 37.27 27.58 N 27 3S E 5.25 6064.13 1916.8 28.5 1684.01 N 915.57 E
6675.00 37.40 27.50 N 27 30 E O.SS 6084.01 1932.0 28.5 1697.46 N 922.59 E
6700.00 38.37 27.35 N 27 21 E 3.90 6103.74 1947.3 28.5 1711.08 N 929.66 E
8
•
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, S" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY -DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
6725.00 37.13 27.23 N 27 14 E 4.97 6123.51 1962.6 28.5 1724.68 N 936.67E
6750.00 36.89 27.07 N 27 4 E 1.03 6143.47 1977.7 28.5 1738.07 N 943.54 E
6775.00 37.34 26.78 N 26 47 E 1.93 6163.41 1992.7 28.5 1751.52 N 950.37 E
6800.00 37.66 26.43 N 26 26 E 1.53 6183.24 2008.0 28.5 1765.13 N 957.19 E
6825.00 37.78 26.21 N 26 13 E 0.72 6203.01 2023.2 28.5 1778.84 N 963.97 E
6850.00 36.44 26.14 N 26 8 E 5.36 6222.95 2038.3 28.4 1792.38 N 970.62 E
6875.00 36.36 26.11 N 26 6 E 0.33 6243.07 2053.1 28.4 1805.70 N 977.16 E
6900.00 37.04 26.07 N 26 4 E 2.72 6263.12 2068.1 28.4 1819.12 N 983.73 E
6925.00 37.04 26.07 N 26 4 E 0.00 6283.07 2083.1 28.4 1832.64 N 990.34 E
6950.00 35.89 26.08 N 26 5 E 4.60 6303.18 2098.0 28.4 1845.99 N 996.87 E
6975.00 36.81 26.02 N 26 1 E 3.68 6323.31 2112.8 28.4 1859.30 N 1003.38 E
7000.00 36.67 25.88 N 25 S3 E 0.65 6343.35 2127.7 28.3 1872.75 N 1009.93 E
7025.00 36.05 25.74 N 25 44 E 2.50 6363.48 2142.5 28.3 1886.09 N 1016.38 E
7050.00 36.78 25.62 N 25 37 E 2.93 6383.60 2157.3 28.3 1899.47 N 1022.81 E
7075.00 36.71 .25.50 N 25 30 E 0.41 6403.63 2172.3 28.3 1912.96 N 1029.26 E
7100.00 35.72 25.37 N 25 22 E 3.97 6423.80 2187.0 28.3 1926.30 N 1035.61E
7125.00 36.62 25.29 N 25 18 E 3.60 6443.98 2201.8 28.2 1939.63 N 1041.92 E
7150.00 35.68 25.27 N 25 16 E 3.76 6464.17 2216.5 28.2 1952.97 N 1048.22 E
7175.00 36.38 25.21 N 25 12 E 2.80 6484.39 2231.2 28.2 1966.27 N 1054.49 E
7200.00 36.33 25.07 N 25 4 E 0.38 6504.52 2246.0 28.2 1979.69 N 1060.78 E
7225.00 35.26 24.92 N 24 55 E 4.29 6524.80 2260.6 28.2 1992.94 N 1066.96 E
7250.00 35.50 24.81 N 24 48 E 1.00 6545.18 2275.0 28.1 2006.07 N 1073.05 E
7275.00 36.33 24.69 N 24 41 E 3.33 6565.43 2289.7 28.1 2019.39 N 1079.18 E
7300.00 35.36 24.52 N 24 31 E 3.90 6585.69 2304.3 28.1 2032.70 N 1085.28E i
9
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH .COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
7325.00 35.05 24.36 N 24 22 E 1.29 6606.12 2318.7 28.1 2045.82 N 1091.24 E
7350.00 35.82 24.26 N 24 16 E 3.09 6626.49 2333.1 28.1 2059.03 N 1097.21 E
7375.00 35.17 24.26 N 24 16 E 2.60 6646.84 2347.6 28.0 2072.26 N 1103.17 E
7400.00 35.22 24.51 N 24 31 E 0.61 6667.27 2362.0 28.0 2085.39 N 1109.12 E
7425.00 35.54 25.26 N 25 16 E 2.15 6687.66 2376.4 28.0 2098.52 N 1115.22 E
7450.00 35.31 26.57 N 26 35 E 3.19 6708.03 2390.9 28.0 2111.55 N 1121.55 E
7475.00 35.17 28.07 N 28 4 E 3.50 6728.45 2405.3 28.0 2124.37 N 1128.17 E
7500.00 36.80 29.08 N 29 S E 6.93 6748.68 2420.0 28.0 2137.26 N 1135.20 E
7525.00 38.13 29.17 N 29 10 E 5.32 6768.52 2435.2 28.0 2150.55 N 1142.60 E
7550.00 39.17 28.54 N 28 32 E 4.44 6788.04 2450.9 28.0 2164.22 N 1150.13 E
7575.00 40.10 27.78 N 27 47 E 4.19 6807.30 2466.8 28.0 2178.28 N 1157.66 E
7600.00 40.47 27.33 N 27 20 E 1.88 6826.37 2483.0 28.0 2192.61 N 1165.13 E
7625.00 40.58 27.22 N 27 13 E 0.52 6845.37 2499.2 28.0 2207.05 N 1172.58 E
7650.00 40.47 27.25 N 27 15 E 0.44 6864.37 2515.4 28.0 2221.50 N 1180.01 E
7675.00 40.32 27.25 N 27 15 E 0.60 6883.41 2531.6 28.0 2235.90 N 1187.43 E
7700.00 40.47 27.23 N 27 14 E 0.60 6902.45 2547.8 28.0 2250.30 N 1194.85 E
7725.00 40.30 27.22 N 27 13 E 0.68 6921.50 2564.0 28.0 2264.71 N 1202.26 E
7750.00 40.21 27.23 N 27 14 E 0.36 6940.58 2580.2 28.0 2279.07 N 1209.65 E
7775.00 40.26 27.21 N 27 13 E 0.21 6959.66 2596.3 28.0 2293.43 N 1217.03 E
7800.00 40.30 27.18 N 27 11 E 0.17 6978.73 2612.5 27.9 2307.81 N 1224.42 E
7825.00 40.07 27.18 N 27 11 E 0.92 6997.83 2628.6 27.9 2322.16 N 1231.79 E
7850.00 39.60 27.19 N 27 11 E 1.88 7017.03 2644.6 27.9 2336.40 N 1239.11 E
7875.00 40.01 27.23 N 27 14 E 1.64 7036.23 2660.7 27.9 2350.64 N 1246.43 E
7900.00 39.49 27.40 N 27 24 E 2.12 7055.46 2676.6 27.9 2364.84 N 1253.76 E
•
•
10
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED 1 N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
7925.00 39.76 27.79 N 27 47 E 1.46 7074.71 2692.6 27.9 2378.97 N 1261.15 E
7950.00 40.22 28.33 N 28 20 E 2.30 7093.87 2708.6 27.9 2393.15 N 1268.71 E
7975.00 40.36 28.78 N 28 47 E 1.31 7112.94 2724.8 27.9 2407.35 N 1276.43 E
8000.00 40.21 28.97 N 28 58 E 0.77 7132.01 2741.0 27.9 2421.50 N 1284.24 E
8025.00 39.94 28.92 N 28 55 E 1.09 7151.14 2757.1 27.9 2435.59 N 1292.03 E
8050.00 39.96 28.81 N 28 48 E 0.30 7170.30 2773.1 28.0 2449.65 N 1299.78 E
8075,00 39.89 28.77 N 28 46 E 0.29 7189.47 2789.2 28.0 2463.71 N 1307.51 E
8100.00 39.77 28.80 N 28 48 E 0.49 7208.67 2805.2 28.0 2477.74 N 1315.22 E
8125.00 39.72 28.$4 N 28 50 E 0.22 7227.89 2821.2 28.0 2491.75 N 1322.92 E
8150.00 39.69 28.88 N 28 53 E 0.16 7247.13 2837.1 28.0 2505.73 N 1330.63 E
8175.00 39.31 28.99 N 28 59 E 1.55 7266.42 2853.0 28.0 2519.65 N 1338.32 E
8200.00 39.53 29.20 N 29 12 E 1.03 7285.73 2868.9 28.0 2533.52 N 1346.04 E
8225.00 40.21 29.45 N 29 27 E 2.79 7304.92 2884.9 28.0 2547.49 N 1353.$9 E
8250.00 40.86 29.63 N 29 38 E 2.64 7323.92 2901.2 28.0 2561.63 N 1361.90 E
8275.00 41.15 29.67 N 29 40 E 1.16 7342,79 2917.6 28.0 2575.89 N 1370.02 E
8300.00 41.00 29.60 N 29 36 E 0.63 7361.63 2934.0 28.0 2590.16 N 1378.14 E
8325.00 41.05 29.52 N 29 31 E 0.29 7380.49 2950.4 28.0 2604.44 N 1386.23 E
8350.00 40.73 29.48 N 29 29 E 1.28 7399.39 2966.7 28.0 2618.68 N 1394.29 E
8375.00 40.52 29.46 N 29 28 E 0.84 7418.37 2983.0 28.0 2632.85 N 1402.30 E
8400.00 40.41 29.39 N 29 23 E 0.48 7437.39 2999.2 28.0 2646.98 N 1410.27 E
8425.00 40.38 29.24 N 29 15 E 0.40 7456.43 3015.4 28.1 2661.11 N 1418.20 E
8450.00 40.70 29.09 N 29 5 E 1.34 7475.42 3031.7 28.1 2675.30 N 1426.12 E
8475.00 40.89 29.00 N 29 0 E 0.79 7494.35 3048.0 28.1 2689.58 N 1434.05 E
8500.00 40.66 28.99 N 28 59 E 0.92 7513.28 3064.3 28.1 2703.86 N 1441.96 E
•
• III
11
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
8525.00 40.72 28.96 N 28 58 E 0.25 7532.24 3080.6 28.1 2718.12 N 1449.86 E
8550.00 39.99 28.84 N 28 50 E 2.94 7551.29 3096.8 28.1 2732.29 N 1457.68 E
8575.00 40.74 28.60 N 28 36 E 3.06 7570.34 3113.0 28.1 2746.49 N 1465.46 E
8640.00 41.07 28.32 N 28 19 E 1.50 7589.23 3129.4 28.1 2760.88 N 1473.27 E
8625.00 41.30 28.12 N 28 7 E 1.07 7608.05 3145.8 28.1 2775.39 N 1481.05 E
8650.00 41.21 28.01 N 28 1 E 0.46 7626.84 3162.3 28.1 2789.94 N 1488.81 E
8675.00 40.76 27.97 N 27 58 E 1.80 7645.71 3178.7 28.1 2804.41 N 1496.50 E
8700.00 41.10 27.95 N 27 57 E 1.36 7664.60 3195.1 28.1 2818.88 N 1504.18 E
8725.00 40.46 27.93 N 27 56 E 2.56 7683.53 3211.4 28.1 2833.31 N 1511.83 E
8750.00 40.72 27.92 N 27 55 E 1.04 7702.52 3227.7 2$.1 2847.68 N 1519.45 E
8775.00 40.69 27.91 N 27 55 E 0.12 7721.47 3244.0 28.1 2862.08 N 1527.08 E
8800.00 40.27 27.89 N 27 54 E 1.68 7740.49 3260.2 28.1 2876.43 N 1534.68 E
8825.00 40.37 27.87 N 27 52 E 0.40 7759.55 3276.4 28.1 2$90.72 N 1542.24 E
8850.00 40.48 27.88 N 27 53 E 0.44 7778.58 3292.6 28.1 2905.05 N 1549.82 E
8875.00 40.74 27.94 N 27 56 E 1.05 7797.56 3308.9 28.1 2919.43 N 1557.44 E
8900.00 40.68 28.02 N 28 1 E 0.31 7816.51 3325.2 28.1 2933.83 N 1565.09 E
8925.00 40.64 28.06 N 28 4 E 0.20 7835.47 3341.5 28.1 2948.21 N 1572.75 E
8950.00 40.98 28.05 N 28 3 E 1.36 7854.39 3357.8 28.1 2962.63 N 1580.43 E
8975.00 41.30 27.99 N 27 59 E 1.29 7873.22 3374.3 28.1 2977.15 N 1588.16 E
9000.00 41.41 27.90 N 27 54 E 0.49 7891.99 3390.8 28.1 2991.74 N 1595.90 E
9025.00 41.41 27.83 N 27 50 E 0.20 7910.74 3407.3 28.1 3046.36 N 1603.63 E
9050.00 41.20 27.77 N 27 46 E 0.86 7924.52 3423.8 28.1 3020.96 N 1611.32 E
9075.00 41.15 27.71 N 27 43 E 0.25 7948.33 3440.3 28.1 3035.53 N 1618.98 E
9100.00 40.88 27.66 N 27 39 E 1.09 7967.20 3456.7 28.1 3050.05 N 1626.61 E
•
•
12
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G SSS
MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg. min. deg./ feet feet deg. feet
100 ft.
9125.00 40.86 27.61 N 27 37 E 0.15 7986.10 3473.0 28.1 3064.55 N 1634.19 E
9150.00 40.69 27.58 N 27 35 E 0.69 8005.04 3489.4 28.1 3079.02 N 1641.76 E
9175.00 40.49 27.57 N 27 34 E 0.80 8024.02 3505.6 28.1 3093.44 N 1649.29 E
9200.00 40.57 27.58 N 27 35 E 0.32 8043.02 3521.9 28.1 3107.84 N 1656.81 E
9225.00 40.27 27.60 N 27 36 E 1.20 8062.05 3538.1 28.1 3122.20 N 1664.31 E
9250.00 40.21 27.59 N 27 35 E 0.24 8081.14 3554.2 28.1 3136.52 N 1671.79 E
9275.00 40.06 27.58 N 27 35 E 0.60 8100.25 3570.4 28.1 3150.80 N 1679.26 E
9300.00 40.04 27.63 N 27 38 E 0.15 8119.39 3586.4 28.1 3165.05 N 1686.71 E
9325.00 40.16 27.79 N 27 48 E 0.64 8138.51 3602.5 28.1 3179.31 N 1694.20 E
9350.00 40.50 28.07 N 28 4 E 1.53 8157.57 3618.7 28.1 3193.60 N 1701.78 E
9375.00 40.95 28.38 N 28 23 E 1.98 8176.52 3635.0 28.1 3207.98 N 1709.49 E
9400.00 41.26 28.65 N 28 39 E 1.42 8195.35 3651.5 28.1 3222.42 N 1717.34 E
9425.00 41.2b 28.82 N 28 49 E 0.47 8214.15 3668.0 28.1 3236.87 N 1725.26 E
9450.00 41.13 2$.91 N 28 SS E 0.57 8232.96 3684.4 28.1 3251.29 N 1733.21 E
9475.00 40.91 28.93 N 28 56 E 0.88 8251.82 3700.8 28.1 3265.66 N 1741.15 E
9500.00 40.91 28.90 N 28 54 E 0.07 8270.71 3717.2 28.1 3279.99 N 1749.06 E
9525.00 40.53 28.85 N 28 51 E 1.52 8289.66 3733.5 28.1 3294.27 N 1756.94 E
9550.00 40.35 28.81 N 28 49 E 0.73 8308.69 3749.7 28.1 3308.47 N 1764.76 E
9575.00 40.17 28.78 N 28 47 E 0.73 8327.77 3765.9 28.1 3322.63 N 1772.54 E
9600.00 39.88 28.77 N 28 46 E 1.16 8346.91 3781.9 28.1 3336.73 N 1780.28 E
9625.00 39.61 28.77 N 2$ 46 E 1.08 8366.13 3797.9 28.1 3350.74 N 1787.97 E
9650.00 39.22 28.77 N 28 46 E 1.56 8385.45 3813.8 28.1 3364.65 N 1795.61 E
9675.00 38.71 28.70 N 28 42 E 2.05 8404.89 3829.5 28.1 3378.44 N 1803.17 E
9700.00 38.59 28.46 N 28 28 E 0.76 8424.41 3845.1 28.1 3392.15 N 1810.64 E
C~
•
13
A Gyrodata Directional Survey
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, S" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G SSS
MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES
feet deg. deg. . deg. min. deg./ feet feet deg. feet
100 ft.
9725.00 39.02 28.01 N 28 1 E 2.05 8443.89 3860.8 28.1 3405.95 N 1818.05 E
9750.00 39.80 27.36 N 27 21 E 3.53 8463.21 3876.7 28.1 3420.01 N 1825.43E
9775.00 41.25 26.53 N 2b 32 E 6.18 8482.21 3892.9 28.1 3434.49 N 1832.78 E
9800.00 42.38 25.56 N 25 33 E 5.21 8500.84 3909.6 28.1 3449.46 N 1840.10 E
9825.00 42.99 24.42 N 24 25 E 3.94 8519.22 3926.5 28.1 3464.83 N 1847.26 E
9850.00 43.68 23.12 N 23 7 E 4.51 8537.40 3943.6 28.0 3480.53 N 1854.17 E
9875.00 44.37 21.76 N 21 46 E 4.68 8555.38 3960.9 28.0 3496.58 N 1860.80 E
9900.00 44.87 20.50 N 20 30 E 4.07 8573.17 3978.3 28.0 3512.96 N 1867.13 E
9925.00 45.07 19.43 N 19 26 E 3.13 8590.86 3995.8 28.0 3529.57 N 1873.16 E
9950.00 45.61 18.56 N 18 34 E 3.28 8608.43 4013.4 27.9 3546.38 N 1878.95 E
9975.00 45.90 17.90 N 17 54 E 2.22 8625.88 4031.0 27.9 3563.39 N 1884.55 E
10000.00 46.60 17.47 N 17 28 E 3.06 8643.17 4048.8 27.8 3580.60 N 1890.04 E
10025.00 47.61 17.22 N 17 13 E 4,.11 8660.18 4066.8 27.8 3598.08 N 1895.50 E
10050.00 48.74 16.99 N lb 59 E 4.57 8676.85 4085.1 27.7 3615.89 N 1900.98 E
10075.00 49.12 16.79 N 16 47 E 1.64 8693.28 4103.7 27.7 3633.92 N 1906.45 E
10100.00 49.01 16.78 N 16 47 E 0.44 8709.66 4122.2 27.6 3652.00 N 1911.91E
10125.00
48.96
16.92
N
16
55
E
0.46
8726.06
4140.7
27.6
3670.06 N •
1917.37 E
10150.00 48.90 16.55 N 16 33 E 1.14 8742.49 4159.2 27.5 3688.11 N 1922.80 E
10175.00 49.42 14.81 N 14 48 E 5.66 8758.84 4177.8 27.5 3706.32 N 1927.91E
10200.00 50.66 11.59 N 11 35 E 11.04 8774.90 4196.3 27.4 3724.97 N 1932.28E i
10225.00 52.87 7.91 N 7 55 E 14.55 8790.37 4215.0 27.3 3744.32 N 1935.59E
10250.00 53.63 5.13 N 5 8 E 9.41 8805.33 4233.7 27.2 3764.21 N 1937.$6 E
10275.00 55.18 3.86 N 3 52 E 7.45 8819.88 4252.5 27.1 3784.48 N 1939.45 E
10300.00 56.65 3.76 N 3 46 E 5.89 8833.89 4271.5 27.0 3805.14 N 1940.83 E
10325.00 57.24 4.24 N 4 14 E 2.85 8847.53 4290.8 26.9 3826.04 N 1942.29 E
14
BP Exploration (Alaska)
Lease: F-Pad Well: F-34B, 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
Job Number: AK1007G 555
A Gyrodata Directional Survey
MEASURED I N C L AZIMUTH BORE HOLE
DEPTH BEARING
feet deg. deg. deg. min.
10350.00 58.18 4.94 N 4 56 E
10375.00 60.04 5.65 N 5 39 E
10400.00 61.37 6.17 N 6 10 E
10425.00 62.81 6.42 N 6 25 E
10450.00 63.86 6.63 N 6 38 E
10475.00 64.34 7.09 N 7 5 E
10500.00 64.46 7.75 N 7 45 E
10525.00 64.68 8.26 N 8 16 E
10550.00 65.12 8.40 N 8 24 E
10575.00 65.03 8.24 N 8 14 E
10587.00 64.58 8.12 N 8 7 E
Final Station Closure: Distance: 4509.95 ft Az: 25.90 deg.
DOGLEG VERTICAL CLOSURE
SEVERITY DEPTH DIST. AZIMUTH
deg./ feet feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4.44 8860.88 4310.4 26.8 3847.11 N 1943.98 E
7.84 8873.72 4330.3 26.7 38b$.47 N 1945.97 E
5.62 8885.95 4350.7 26.6 3890.15 N 1948.21 E
5.83 8897.65 4371.5 26.5 3912.11 N 1954.63 E
4.27 8908.87 4392.5 26.4 3934.31 N 1953.17 E
2.53 8919.79 4413.7 26.3 3956.64 N 1955.86 E
2.42 8930.59 4435.0 26.2 3978.99 N 1958.77 E
2.06 8941.33 4456.4 26.1 4001.35 N 1961.91 E
1.83 8951.93 4478.0 26.0 4023.75 N 1965.19 E
0.69 8962.47 4499.6 25.9 4046.18 N 1968.47 E
3.85 8967.58 4510.0 25.9 4056.93 N 1970.02 E
•
•
15
BP Exploration (Alaska)
Well: F-Pad F-34B 5" Tubing
Location: Wellhead. Prudhoe Bav. Alaska
Interp Inrun
Gyrodata
AK1007G_555 DEFINITIVE
4000
3540
3000
2500
.-.
z
= 2000
O
z
1500
1000
500
0
BOTTO HOLE
MD: 10 87.00
•
•
0 200 400 600 800 1000 1200 1400 1600 1800 2000
FASTING (ft)
BP Exploration (Alaska)
Well: F-Pad F-34B 5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
24
22
20
18
0 16
0
rn
m
X14
X12
u.~
X10
t7
O
8
6
4
2
Interp Inrun
Gyrodata `
AK1007G_555 DEFINITIVE
BO OM HO
LOC TED
MD: 10587.1
•
•
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
.MEASURED DEPTH (ft)
BP Exploration (Alaska)
' Well: F-Pad F-346.5" Tubing
Location: Wellhead, Prudhoe Bay, Alaska
65
60
55
50
45
40
z
O
a 35
z
J
U
30
25
20
15
10
5
0
Interp Inrun
Gyrodata
AK1007G_555 DEFINITIVE
OM HC
.TED
•
•
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000
MEASURED DEPTH (ft)
1> C J""....'L
DATA SUBMITTAL COMPLIANCE REPORT
5/31/2007
Permit to Drill 2050530
Well Name/No. PRUDHOE BAY UNIT F-34B
Operator BP EXPLORATION (ALASKA) INC
>Pt.t-J. 11 4 .J.Ar( 7
API No. 50-029-21980-02-00
MD
1 0850 ~
TVD 9082
",
Completion Date 5/31/2005
Completion Status
1-01L
Current Status 1-01L
UIC N
REQUIRED INFORMATION
Mud Log No
Samples No
Directional surv~
-.-
--
----
--~~."~"-~--"~
-~-~--_.~-~
DATA INFORMATION
Types Electric or Other Logs Run: MWD DIR / GR / RES / NEU / DEN / Dipole Sonic / PWD, Sidewall Co (data taken from Logs Portion of Master Well Data Maint
Well Log Information: e
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
I ED ~
D Asc Directional Survey 7476 10850 7/7/2005 Definitive
~D Lis 13182 Induction/Resistivity 7266 10807 Open 7/14/2005 GR EWR4 PWD ROP
~ 13182 LIS Verification 0 0 7/14/2005
~ C Lis 13304 Neutron 10067 10761 Case 9/30/2005 LDWG edit of Memory CNL
13304 Neutron 5 Blu 7300 10761 Case 9/30/2005 Memory CNL & Jewelry
Log LEE GR/CCUCNL 31
r May 2005
Induction/Resistivity 2 Blu 7482 8664 Open 11/21/2005 Platform Express / Array
Induction AIT-DSI-PEX,
TCOM Presentation 20
£C April 2005
Lis 13644 Induction/Resistivity 7483 10850 Open 2/22/2006 ROP DGR EWR plus
Graphics
~ See Notes Blu 7482 8664 Open 11/21/2005 Modular Sidewall Coring -
v: Tool Rotary Cores 20 April
2005
Lis 13369 I nd uction/Resistivity Compo 7406 8595 Open 11/21/2005 GR,SP ,Sonic,Neutron, ROH
L_~___. B,RES + PDS Graphics
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
DATA SUBMITTAL COMPLIANCE REPORT
5/31/2007
Permit to Drill 2050530
Well Name/No. PRUDHOE BAY UNIT F-34B
Operator BP EXPLORATION (ALASKA) INC
MD 10850 TVD 9082 Completion Date 5/31/2005
ADDITIONAL INFORMATION
Well Cored? (»/ N S \I'Í c...- b ~
Completion Status 1-01L
Current Status 1-01L
Daily History Received?
0tN
(J/N
Chips Received? ~
Formation Tops
Analysis
Received?
'NoW- eu.t'ttr~' en..... () "'~
Comments:
Compliance Reviewed By:
.~
Date:
API No. 50-029-21980-02-00
UIC N
e
¿~~~
--
.
.
WELL LOG TRANSMITTAL
é)05-D53
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West ih Ave., Suite 100
Anchorage, Alaska 99501
February 17, 2006
J báJ44-'
RE: MWD Fonnation Evaluation Logs F-34B,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
F-34B:
LAS Data & Digital Log Images:
50-029-21980-02
1 CD Rom
~~
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
MPF-91
F-348
F-348
F-348
F-348
F-348
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job #
11090718
10913019
10913019
10913019
10913019
10913019
RECE\VED
~. , ¡". " r"¡'~Ph'
; I~/¿ ~ L!JU,)
~\ 6
\\\~\\D
'" mm;~\(}í\
. "". ':i"'. i"'",,,, ('I'\n<:, \,.¡o l \ ¡"",. , .
f,,\~:~k~~ \,.}~.ry. \J~w \J'-J .':1
. éJ'''··· ÞJì¡¡TI~ge ~DS _ ð~.3
BL
Log Description
SCMT (PDC-GR)
OH LDWG EDIT PEX-AIT-DSI-POR·TCOM-MSCT
PEX-AIT
PEX-POROSITY
PEX-TCOM
MSCT
{~tQ\jCi~Q lfì
Date
10/18/05
04/20/05
04/20/05
04/20/05
04/20/05
04/20/05
NO. 3511
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay, Milne pt.
Color CD
1 1
1
1
1
1
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TTN: Beth
Received by:
\ \ I ;f\ \ 06
10/28/05
;;05-.
.;)..05- os-5'
,
I
I
j
I
i
I
.
Schlumbel'gel'
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503·2838
ATTN: Beth
Well
Job#
10679056
11054181
10662951
10942212
10715445
,)..c,)..-Ä,!>K 4-10A/L-28
. rí\..~""'" 'F:â4B
,Ar-- :l..,? H-26
..lu;¡" - cH. '8 J-16A
~t» -Ö')..~ 07-30A
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2·1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
3ò
09/28/05
NO. 3476
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Log Description
Date BL Color CD
02/03/04 1- 1- 13'3ö3
05/31/05 1......... 1....... I.> J alf
09/17/03 1-- 1--- /'} 1cr
05/06/05 1 ~ 1.- 133'01c
12/09/04 1- 13 )t¡7
.
RST
MCNL
RST
MCNL
MCNL (PRINT SENT 1/24/05)
.
~\-
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK L9503 838 YJJ
ATTN: Beth I r'
Received by: N .
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Helen Wannan
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
July 14, 2005
#131%1-
:A.tj-- (J,.Ç>
RE: MWD Formation Evaluation Logs: F-34B,
AK-MW-3649138
1 LDWG formatted Disc with verification listing.
API#: 50-029-21980-02
PLEAS); ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LEITER TO THE AITENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Explomtion (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: 51 l1;~\
s~: ItvrJ. &J
.. STATEOFALASKA .
ALASKA ~ AND GAS CONSERVATION COMM ON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
..
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD DIR I GR 1 RES I NEU 1 DEN 1 Dipole Sonic 1 PWD, Sidewall Cores, MWD DlR 1 GR I RES,
CASING, LINER AND CEMENTING RECORD
SrnlNG DePTH MD SETTING DEPTH TVO
'lOP BOTTOM lOP BOTTOM
Surface 110' Surface 110'
Surface 2689' Surface 2689'
Surface 7483' Surface 6739'
7333' 10142' 6617' 8740'
8493' 10850' 7513' 9082'
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2133' SNL, 2412' EWL, SEC. 02, T11N, R13E, UM
Top of Productive Horizon:
1917' NSL, 4378' EWL, SEC. 35, T12N, R13E, UM
Total Depth:
2157' NSL, 4399' EWL, SEC. 35, T12N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 651959 y- 5974667 Zone- ASP4
TPI: x- 653837 y- 5978756 Zone- ASP4
Total Depth: x- 653854 y- 5978996 Zone- ASP4
18. Directional Survey 181 Yes 0 No
22.
CASING
SIZE
WT.
Conductor
68#
47#
26#
12.6#
L-80
L-80
L-80
13Cr80
20"
13-3/8"
9-518"
7"
4-1/2"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
2-7/8" Gun Diameter, 4spf
MD TVD MD TVD
10635' - 10660' 8987' - 8998'
10660' - 10685' 8998' - 9008'
10685' - 10710' 9008' - 9019'
10710' - 10735' 9019' - 9030'
26.
Date First Production:
June 4, 2005
Date of Test Hours Tested PRODUCTION FOR
6/7/2005 4 TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 425 1,500 24-HoUR RATE
One Other
5. Date Comp., Susp., or Aband.
5/31/2005
6. Date Spudded
4/1712005
7. Date T.D. Reached
4/24/2005
8. KB Elevation (ft):
64.38'
9. Plug Back Depth (MD+ TVD)
10762 + 9042
10. Total Depth (MD+TVD)
10850 + 9082
11. Depth where SSSV set
(Nipple) 2192' MD
19. Water depth, if offshore
NIA MSL
17-1/2"
12-1/4"
8-112"
6-1/8"
24.
SIZE
4-1/2", 12.6#, 13Cr80
1 b. Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
205-053
13. API Number
50- 029-21980-02-00
14. Well Name and Number:
PBU F-34B
15. Field I Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
Pool
Ft
Ft
16. Property Designation:
ADL 028277
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
RST
CEMENTING RECORD
AMOUNT
PUllED
3723 cu ft Permafrost
2059 cu ft Class 'G'
472 cu ft LiteCRETE, 281 cu ft 'G'
236 cu ft Class 'G'
DEPTH SET (MD)
8021'
PACKER SET (MD)
7974'
25. ACID,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect wI 160 Bbls of Diesel
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Oll-Bsl GAs-McF WATER-Bsl
78 301 354
Oll-Bsl
467
GAs-McF
1,804
W A TER-Bsl
2,122
CHOKE SIZE I GAS-Oil RATIO
64.70 3,866
Oil GRAVITY-API (CORR)
26.3
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
- ¡."'Ire), .'
-.WLLsd
1 . ~.
Vjfµ¡-lED ¡
t, JVt"' !
Form 10-467 Revis;ð :.~ 2/2003
n !~IAL
' ¡ >;.¡
CONTINUED ON REVERSE SIDE
RBDMS 8Ft J0N 2 0 2005
(,F
28.
.
GEOLOGIC MARKERS
29.
_MATtON TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
10148'
8744'
None
Shublik
10228'
8794'
Sadlerochit I Zone 4B
10365'
8869'
Zone 4A I 42N
10467'
8915'
Top CGL I Top Zone 3
Base CGL I Top Zone 2
10582'
8965'
10742'
9033'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Sidewall Core Summary
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie HUbble~MLe.. ~ Title Technical Assistant Date Cf..s:> .. { 5-(A5
PBU F-34B 205-053 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Phil Smith, 564-4897
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
(psi) (ppg)
4,565 (psi) 3.01 (ppg)
4,543 (psi) 0.01 (ppg)
.
.
Printed: 5/2/2005 7:56:49 AM
(psi
880 (psi
730 (psi
(ppg)
0.50 (ppg)
8.40 (ppg)
Test Depth (TVD)
(ft)
6,755.0 (ft)
8,739.0 (ft)
(ft)
7,500.0 (ft)
0,162.0 (ft)
Legal Name F-34B
Common Name: F-34B
4/16/2005 FIT
4/17/2005 FIT
4/24/2005 FIT
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/12/2005 21 :00 - 00:00 3.00 MOB P PRE Rig was released from well # 17-13 @ 21 :00 hrs 4-12-2005.
UD derick, move rig to well F-34B. Move distance is 17 miles.
4/13/2005 00:00 - 16:00 16.00 MOB P PRE Move sub base from DS # 17 to F-Pad. Move distance was 17
miles, derrick down.
16:00 - 18:00 2.00 MOB P PRE Arrive @ F-Pad with sub base. Lay herculite & set matting
boards. Spot sub and close doors on rig.
18:00 - 22:00 4.00 MOB P PRE PJSM. Raise & pin derrick. Bridle down. RlU rig floor. Set
plywood & drip liner in cellar. Berm sub, prep walkways.
22:00 - 00:00 2.00 MOB P PRE Lay herculite, spot mud pits, cuttings tank, camp & shop. Hook
up lines, complete rig up.
4/14/2005 00:00 - 01 :00 1.00 WHSUR DECOMP Accept rig for operations @ 00:01 hrs on 4-14-2005. Hold
pre-spud meeting with drill crew & WSL.
01 :00 - 03:00 2.00 WHSUR DECOMP Install secondary annulus valve. R/U circ lines to tree. Take on
seawater.
03:00 - 04:00 1.00 WHSUR DECOMP R/U DSM and pull BPV with lubricator.
04:00 - 09:00 5.00 WHSUR DECOMP Reverse circ freeze protect from annulus. Pump down tubing
and circ out freeze protect from tubing. Pump soap pill and
displace well to clean 8.5 ppg seawater.
09:00 - 14:30 5.50 WHSUR DECOMP Install TWC valve & test from below to 1000 psi. Blow down
lines & nipple down tree & adaptor flange. Remove from cellar.
Check hanger threads, OK.
14:30 - 17:00 2.50 WHSUR DECOMP Nipple up 135/8" X 5000 psi BOP.
17:00 - 00:00 7.00 WHSUR DECOMP R/U & test BOPE & all related valves. Test to 250 psi low &
3500 psi high pressure. Test annular preventor to 250/2500.
Test was witnessed by John Crisp with the AOGCC. Test
witnessed by B.P. WSL. Lower manuallBOP valve on top drive
would not hold low pressure test. Upper & lower hyd accuated
valves on top drive passed test. Lower manual valve will be
changed after tubing is layed down.
4/15/2005 00:00 - 02:30 2.50 PULL P DECOMP R/U DSM and lubricator, attempt to pull TWC valve, can not
engage. R/D lubricator and pick up joint of drill pipe, flush top of
TWC with water. UD pipe & P/U lubricator & pull TWC.
02:30 - 05:00 2.50 PULL P DECOMP R/U tubing tongs and handling equipment. M/U landing joint
and XO, screw into hanger. Hold PJSM with drill crew,
Cameron, Schlumberger & casing hand. BOLDS & pull hanger
free @ 110K. Observe well. Pull hanger to floor & UD same.
Rig up control line spooling unit.
05:00 - 08:00 3.00 PULL P DECOMP POH UD 4.5" 12.6 # L-80 tubing. Pin ends showing significant
corrosion. POH from 7719' to 5526'. Recovered 56 stainless
steel bands, 3 GLM, 1 SVLN, 183 joints of tubing & 1 cut joint
@ 20.56'. R/D control line spooling unit.
08:00 - 13:30 5.50 PULL P DECOMP POH UD tubing from 5526'. Clear & clean rig floor.
13:30 - 16:30 3.00 BOPSUP P DECOMP M/U 4" test joint, install test plug, RILDS. Test upper and lower
pipe rams 250 psi low and 3500 high. Test annular preventor to
250/3500 psi. UD test equipment. Install wear ring. Test &
install top drive manuallBOP valve to 250/3500. Test
witnessed by WSL.
16:30 - 19:30 3.00 DHB P DECOMP PJSM. R/U Schlumberger wiire line service, RIH with CCL &
8.51 gauge ring to 7720'.
19:30 - 23:30 4.00 DHB P DECOMP RIH with HES CIBP, set with top @ 7508'. POH, RID SWS.
23:30 - 00:00 0.50 DHB P DECOMP R/U and attempt to test casing against blind rams, rams
leaked. Pull wear ring & set test plug & change rams.
4/16/2005 00:00 - 04:00 4.00 DHB N RREP DECOMP Install test plug and change out failed blind/shear rams to blind
Printed: 5/2/2005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/16/2005 00:00 - 04:00 4.00 DHB N RREP DECaMP rams. Test to 250 psi low & 3500 high. Pull test plug & install
wear ring.
04:00 -05:00 1.00 DHB P DECaMP Test 9/5/8" casing to 3500 psi for 30 min, record on chart, OK.
Test witnessed by B.P. WSL.
05:00 - 09:00 4.00 WHIP P WEXIT P/U 9518" whipstock, MWD, DC's, HWDP, upload and orient.
Test MWD @ 475 GPM @ 840 psi.
09:00 - 15:30 6.50 WHIP P WEXIT RIH with whip stock P/U drill pipe to 7478'. Install blower hose
on top drive.
15:30 - 16:00 0.50 WHIP P WEXIT Orient whip stock 6 degrees left. UWT = 175K, DWT = 150K,
Tag CIBP @ 7505'.Set anchor @ 25K down, P/U 10K over to
confirm set. Shear off @ 103K down, P/U to confirm shear.
Circ @ 500 gpm @ 2000 psi.
16:00 - 17:00 1.00 WHIP N WAIT WEXIT Cut and slip 85' drill line while waiting on vac trucks for well
displacement.
17:00 - 18:00 1.00 WHIP N WAIT WEXIT Trucks still not available to displace well to mud. Circulate @
reduced rate and wait on trucks.
18:00 - 20:00 2.00 WHIP P WEXIT Pump sweep and displace well to 10.5 ppg LSND mud, pump
@ 500 gpm @ 2750 psi. UWT = 165K, DWT = 145k, RWT ~
157K.
20:00 - 00:00 4.00 WHIP P WEXIT Mill window in 9 5/8" casing from 7483' to 7493'. Torque", 6/7
K, 105 rpm, WOB = 2/5K, 2650 psi @ 500 gpm.
4/17/2005 00:00 - 02:00 2.00 WHIP P WEXIT Mill window in 9 5/8" casing. TOW @ 7483', BOW @ 7500'.
Drill 20' of new formation to 7511 '.
02:00 - 02:30 0.50 WHIP P WEXIT Pump sweep back to surface. Recovered a total of 230 pounds
of metal cuttings.
02:30 - 03:00 0.50 WHIP P WEXIT Pull into casing and perform FIT to 13.0 ppg with 10.5 ppg mud
wt @ 880 psi. Flow check, pump dry job.
03:00 - 06:30 3.50 WHIP P WEXIT POH for 8.5" drilling assy.
06:30 - 08:00 1.50 WHIP P WEXIT POH W/ HWDP & drill collars, UD bumper sub & HBO. Down
load MWD, break & UD MWD. Break & UD milling tools. Clear
& clean rig floor.
08:00 - 09:00 1.00 WHIP P WEXIT Pull wear bushing, P/U stack washer & flush metal cuttings
from BOP stack. Run wear bushing, UD tools.
09:00 - 15:30 6.50 WHIP P WEXIT M/U 8.5" bit & mud motor, upload MWD [MWD tool not getting
signal, break & UD] Reconfigure MWD tools. Install probes &
upload, pulse test. M/U DCs, jars & HWDP to 1097'.
15:30 - 19:30 4.00 WHIP P WEXIT RIH, P/U drill pipe from 1097' to 6480'. RIH with drill pipe from
derrick to 7310'. [Fill pipe & test MWD @ 3000' intervals.]
19:30 - 21:00 1.50 WHIP P WEXIT MADD pass in casing from 7310' to 7438' for gamma ray tie-in,
make pass @ 140 fph @ 430 gpm.
21 :00 - 21 :30 0.50 WHIP P WEXIT Orient 6 degrees LHS & pass through window @ 7500', tag
bottom @ 7511'.
21 :30 - 00:00 2.50 DRILL P INT1 Drill from 7511' to 7625'. AST = 1.41, ART = .32. UWT = 175K,
RWT = 165K, DWT = 145K, pump @ 505 gpm @ 3300 psi.
Torque on btm = 7/8K, torque off btm = 5K @ 55 rpm. ECD =
11.47
4/18/2005 00:00 - 08:30 8.50 DRILL P INT1 Directionaly drill 8.5" hole from 7625' to 8440', ECD = 11.42.
ART = 5.74, AST = 2.58 hr.
08:30 - 09:30 1.00 DRILL X WAIT INT1 Pump sweep & circ @ 502 gpm @ 3550 psi. [Waiting on
Schlumberger Wire Line trucks]
09:30 - 10:30 1.00 DRILL X WAIT INT1 Pull into 9 5/8" casing @ 7437'. [Waiting on SWL trucks]
10:30 - 12:00 1.50 DRILL X WAIT INT1 Service top drive & drawworks. [Waiting on SWL trucks]
12:00 - 13:00 1.00 DRILL X WAIT INT1 Orient to pass through window. Blow down top drive. RIH from
Printed: 5/2/2005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/18/2005 12:00 - 13:00 1.00 DRILL X WAIT INT1 7437' to 8440'. Hole in good shape.
13:00 - 16:00 3.00 DRILL P INT1 Drill from 8440' to 8670'. ART = 2.08, AST = .25 hr, UWT =
185K, DWT = 150K, RWT = 170K. Torque = 6/8K on bottom,
5/7 off @ 75 rpm. Pump", 3600 psi @ 500 gpm.
16:00 - 16:30 0.50 DRILL P INT1 Pump high vis sweep and circ sweep up hole to 1000' above
window.
16:30 - 17:00 0.50 DRILL C INT1 POH from 8670' to 8372' wet, UWT = 200K.
17:00 - 18:30 1.50 DRILL C INT1 Circ. sweep out @ 500 gpm @ 3400 psi while rotating &
reciprocating, circ hole clean. Pump dry job.
18:30 - 19:00 0.50 DRILL C INT1 POH from 8372' to 7462', hole in good shape, UWT = 190K.
19:00 - 19:30 0.50 DRILL C INT1 Observe well @ window.
19:30 - 22:30 3.00 DRILL C INT1 Blow down top drive, remove blower hose. Install air slips.
POH from 7462' to 1097'.
22:30 - 00:00 1.50 DRILL C INT1 Stand back HWDP & drill collars. Flush & down load MWD
tools.
4/19/2005 00:00 - 01 :30 1.50 DRILL P INT1 Down load MWD, break & remove probes from hang off collar.
UD bit, motor & stb. Clear & clean rig floor.
01 :30 - 03:00 1.50 DRILL C INT1 PJSM with SchlumbergerWire Line crew & drill crew. RIUSWL
& tools.
03:00 - 06:30 3.50 DRILL C INT1 RIH with GR/RES/NEU/DEN-DIPOLE SONIC. Tools would not
pass 7780'. POH, break & UD tools, R/D SWL.
06:30 - 08:30 2.00 DRILL C INT1 Change out swivel packing on top drive.
08:30 - 09:30 1.00 DRILL X INT1 M/U 8.5" clean out BHA, RIH to 1028'.
09:30 - 12:00 2.50 DRILL X INT1 RIH to 7463'.
12:00 - 13:30 1.50 DRILL X INT1 Cut & slip drill line. Service top drive & crown. Install blower
hose & fill pipe.
13:30 - 14:30 1.00 DRILL X INT1 RIH from 7463' to 7780'. Back ream @ 7780'. Work through
tight spots from 7932'. to 8067'. UWT = 190K, DWT = 150K.
14:30 - 15:30 1.00 DRILL X INT1 Wash & ream through tight spots @ 8188' & 8568'. RPM = 60,
torque = 6/8K, pump @ 440 gpm @ 2580 psi. Wash to bottom
@ 8670'.
15:30 - 16:30 1.00 DRILL X INT1 Pump 40 bbl hi-vis sweep, circ until clean, rotate & reciprocate
@ 110 rpm. Torque = 5/7K, pump @ 520 gpm @ 2900 psi.
16:30 - 18:00 1.50 DRILL X INT1 Short trip From 8670' to 9 5/8" casing @ 7483'. Overpull 25K
@ 8095', work through tight spot. RIH, hole in good shape.
18:00 - 19:30 1.50 DRILL X INT1 Pump 40 bbl hi-vis sweep, Rotate & reciprocate @ 110 rpm,
pump = 525 gpm @ 2870 psi, circ until clean, pump dry job.
19:30 - 22:30 3.00 DRILL X INT1 POH from 8670' to 7463', light overpull @ 7857'. Blow down
top drive, observe well, remove blower hose. POH to 1028'.
22:30 - 00:00 1.50 DRILL C INT1 PJSM. Stand back BHA. Break & UD both stbs & bit. Clear &
clean rig floor.
4/20/2005 00:00 - 01 :30 1.50 DRILL C INT1 PJSM with Sclumberger Wire Line crew & Drill crew. RIU
SWL.
01 :30 - 05:00 3.50 DRILL C INT1 RIH for open hole logs, Run DEN/NEU/RES/DP/SONIC/GPIC.
Log from 8670' to 7900'. POH & rig down tools.
05:00 - 15:30 10.50 DRILL C INT1 RIH for sidewall cores, Take core samples @
8088' ,8092' ,8095' ,8100' ,8105' ,8114' ,8124' ,8133' ,8140' ,8148' ,81
53' ,8386' ,8383' ,8378' ,8376' ,8373' ,8366' ,8362' ,8356' ,8336' ,8320
',8314' ,8310' ,8306' ,8297' ,8279' ,8275' ,8269' ,8264' ,8255' ,8237' ,8
234' ,8230' ,8222' ,8432' ,8418' ,8330' ,8212' ,8196' ,8165' ,8038' ,803
4'. POH from 8034' to surface, break down tools. Evaluate core
recovery, R/D SWL.
15:30 - 18:30 3.00 DRILL C INT1 P/U mud motor, pony collar,stb. M/U bit & scribe, upload MWD
Printed: 5/2/2005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/20/2005 15:30 - 18:30 3.00 DRILL C INT1 & surface test same. M/U D.Cs & HWDP to 1111 '.
18:30 - 22:30 4.00 DRILL C INT1 RIH from 1111' to 7453', fill pipe & pulse test @ 3000' intervals.
Orient & pass through window. Install blower hose. RIH to
8476', pump up surveys @ 8476' & 8668'. Wash to bottom @
8670'. [4' of fill]
22:30 - 00:00 1.50 DRILL P INT1 Drill from 8670' to 8720', ART = .68 hr. Torque on bottom =
6/8K, off bottom = 5/6k, pump @ 500 gpm @ 3500 psi. ECD =
11.24
4/21/2005 00:00 - 00:00 24.00 DRILL P INT1 Directionally drill 8.5" hole from 8720' to casing point @ 10142'.
AST = 5.88, ART = 13.04. HWT = 210K, RWT = 187K, DWT =
155K. Torque on bottom = 11/13K, off = 10/11 K @ 75 rpm.
Pump = 500 gpm @ 3850 psi. WOB = 10K. ECD average =
11.2 Hole in good shape.
4/22/2005 00:00 - 01 :00 1.00 DRILL P INT1 CBU for cuttings sample for Geologist.
01 :00 - 02:30 1.50 DRILL P INT1 Pump sweep & CBU @ 500 gpm @ 3700 psi.
02:30 - 03:30 1.00 DRILL P INT1 Short trip to window @ 7483'.
03:30 - 04:30 1.00 DRILL P INT1 RIH to bottom @10142'. Hole in good shape.
04:30 - 08:30 4.00 DRILL P INT1 Break circ. wash last stand down from 10064' to bottom @
10142'. Pump sweep and CBU. Spot liner running pill
containing 3% lubricant in open hole followed by dry job.
08:30 - 12:00 3.50 DRILL P INT1 POH from 10142' to to 7452', drop 2 3/8" rabbit down drill pipe.
Remove blower hose from top drive, install air slips. POH to
1111'.
12:00 - 16:00 4.00 DRILL P INT1 UD HWDP, retrieve rabbit. UD jars & flex collars. Pull probes
from MWD, flush with fresh water & down load. UD BHA. Clear
& clean rig floor.
16:00 - 16:30 0.50 CASE P LNR1 R/U casing tools.
16:30 - 21 :00 4.50 CASE P LNR1 PJSM. RIH with 7" 26# L-80 BTC-M casing, check floats are
holding.
21 :00 - 21 :30 0.50 CASE P LNR1 P/U 1 stand of drill pipe on top of liner, circ casing volume.
UWT = 95K, SWT = 85K.
21 :30 - 00:00 2.50 CASE P LNR1 RIH with 7" liner on 4" drill pipe.
4/23/2005 00:00 - 01 :00 1.00 CASE P LNR1 RIH with 7" liner on drill pipe from 6830' to 7483'. Fill pipe @ 10
stand intervals.
01 :00 - 01 :30 0.50 CASE P LNR1 Circ drill pipe volume, pump @ 6 bpm @ 780 psi. Blow down
top drive.
01 :30 - 03:00 1.50 CASE P LNR1 RIH from 7483' to 10125'.
03:00 - 03:30 0.50 CASE P LNR1 Pick up cement head, rig up manifold & lines. Break circ, stage
pump up to 5 bpm @ 1050 psi. Set liner on bottom @ 10142'.
PJSM with drill crew, Schlumberger & Veco truck pusher. R/U
to cement 7" liner.
03:30 - 07:30 4.00 CASE P LNR1 Stage pumps up to 5 bpm @ 1050 psi. Pump 5 bbl water, test
lines to 4500 psi. Wash lines with spacer, pump 25 bbl of 11.8
ppg mudpush followed by 84 bbl 12.5 ppg lead cement. Pump
50 bbl of 15.8 ppg tail cement, wash lines, drop dart. Displace
with 177 bbl of mud, bump plug with 4000 psi. CIP @ 07:15.
Set down 65K weight to set liner hanger. Floats held OK.
07:30 - 08:30 1.00 CASE P LNR1 Rotate 15 RHT, pressure up to 1000 psi, unsting, circ 30 bbl,
slow pumps, rotate down and set liner top packer. Good
indication @ surface that packer set. CBU @ 7333' @ 10 bpm
@ 2200 psi. Had +- 40 bbl cement returns to surface.
08:30 - 09:30 1.00 CASE P LNR1 Circ & condition mud, @ 7333' @ 9 bpm @ 1500 psi.
09:30 - 10:00 0.50 CASE P LNR1 UD cement head. RID manifold & lines.
Printed: 5/2/2005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/23/2005 10:00 - 10:30 0.50 CASE P LNR1 POH from 7333' to 6401'.
10:30 - 12:30 2.00 CASE P LNR1 Cut & slip drill line. Adjust brakes & check brake rollers.
Lubricate rig, service top drive.
12:30 - 15:00 2.50 CASE P LNR1 POH from 6401' to surface, UD liner running tool.
15:00 - 16:00 1.00 CASE P LNR1 Test 9 5/8" X 7" liner lap & casing to 3500 psi for 30 min.
16:00 - 18:30 2.50 CASE P LNR1 Pull wear ring, set test plug & change out leaking annular valve
on tubing spool. Change blind rams to blind/shear rams. Pull
test plug, set wear bushing, test rams to 250/3500 psi.
18:30 - 20:30 2.00 DRILL P PROD1 Pick up BHA. M/U bit, mud motor, MWD, upload MWD. P/U
drill collars, HWDP & jars. RIH with 1 stand of drill pipe & test
MWD.
20:30 - 00:00 3.50 DRILL P PROD1 RIH to top of landing collar @ 10053'. Fill pipe @ 3000'
intervals.
4/24/2005 00:00 - 01 :00 1.00 DRILL P PROD1 Drill float equipment from landing collar @ 10056' to shoe @
10142'. Pump @ 275 gpm @ 2850 psi.
01 :00 - 03:00 2.00 DRILL P PROD1 Pump 100 bbl of water, 50 bbl of hi-vis spacer & displace well
to 8.4 ppg FloPro mud. Pump = 1590 psi @ 275 gpm.
03:00 - 03:30 0.50 DRILL P PROD1 Take slow pump rates, drill shoe & 20' of new formation to
10162'. ART = .25.
03:30 - 04:30 1.00 DRILL P PROD1 Circulate, pull to 7" casing. Perform F.I.T. test to 10.0 ppg
EMW. OMWT = 8.4, TVD '" 8740, pressure up to 730 psi.
04:30 - 23:30 19.00 DRILL P PROD1 Directionally drill 6 1/8" hole from 10162' to T.D. @ 10850. AST
'" 3.01, ART", 6.31. UWT '" 185K, RWT '" 170K, DWT", 150K,
torque on bottom = 6K, torque off bottom", 5K.
23:30 - 00:00 0.50 DRILL P PROD1 Pump sweep,CBU. Pump @ 274 gpm @ 1850 psi.
4/25/2005 00:00 - 02:00 2.00 DRILL P PROD1 CBU @ 10850' @ 275 gpm @ 1825 psi. Monitor well.
02:00 - 02:30 0.50 DRILL P PROD1 POH wet from 10850' to 10142'. Hole in good shape. Monitor
well.
02:30 - 03:00 0.50 DRILL P PROD1 Lube rig, service top drive.
03:00 - 03:30 0.50 DRILL P PROD1 RIH from 10142' to 10850'. Hole in good shape, no fill on
bottom.
03:30 - 06:00 2.50 DRILL P PROD1 Pump high vis sweep, circ & cond hole for 4.5" liner. Pump @
275 gpm @ 1825 psi. Spot liner pill. Monitor well.
06:00 - 06:30 0.50 DRILL P PROD1 Drop ESS survey tool, survey @ 10831' & 10737'.
06:30 - 07:00 0.50 DRILL P PROD1 POH wet from 10850' to casing shoe @ 10142'. Monitor well.
07:00 - 07:30 0.50 DRILL P PROD1 Pump dry job, blow down top drive. remove blower hose.
07:30 - 10:30 3.00 DRILL P PROD1 POH from 10142' to 351'.
10:30 - 13:00 2.50 DRILL P PROD1 PJSM. UD BHA, flush tools with fresh water. Down load MWD
tools, UD mud motor & bit.
13:00 - 14:30 1.50 RUNCOIvP RUNCMP Remove saver sub from top drive. R/U casing tools.
14:30 - 19:00 4.50 RUNCOIvP RUNCMP RIH with 4.5",12.6#, CR13-80, Vam-Top liner.
19:00 - 20:00 1.00 RUNCOIvP RUNCMP R/D casing tools, M/U top drive saver sub.
20:00 - 20:30 0.50 RUNCOIvP RUNCMP Circ casing volume. UWT '" 55K.
20:30 - 00:00 3.50 RUNCOIvP RUNCMP RIH to 7" shoe @ 10142'. Circ drill pipe & casing volume.
4/26/2005 00:00 - 02:00 2.00 RUNCOIvP RUNCMP Circ & cond hole, pump @ 5 bpm , 870 psi.
02:00 - 03:00 1.00 RUNCOMN WAIT RUNCMP Wait on trucks for cement job. Continue to circ & cond hole.
PJSM with Schlumberger & drill crew.
03:00 - 04:00 1.00 RUNCOIvP RUNCMP Pump 5 bbl water, test lines to 4500 psi. Pump 15 bbl CW 100
preflush & 20 bbl 9.5 ppg mudpush followed by 42 bbl of 15.8
ppg cement. Wash lines with perf pill, drop wiper plug, displace
with 49 bbl perf pill followed by mud, total displacement = 118
bbl. Bump plug with 4000 psi and set hydraulic hanger. Set
down comfirm set of liner hanger, check floats, OK. CIP @
Printed: 5/212005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/26/2005 03:00 - 04:00 1.00 RUNCOMP RUNCMP 0430.
04:00 - 04:30 0.50 RUNCOMP RUNCMP Rotate 15 RHT to release from hanger. Pressure up to 1000
psi & unsting. Circ 30 bbl @ 11 bpm. Set down 65K to set
packer,slow pump & rotate down 35K 2 times to confirm packer
set, good surface indication packer/hanger set.
04:30 - 05:00 0.50 RUNCOMP RUNCMP CBU, trace of cement in returns @ bottoms up.
I Approximately 1 gal rinsate fresh water discharge at cement
I unit. 5700 called REF: IR 2005-IR-1339222
I Instructed to clean up and recycled with rest of rinsate water.
I
05:00 - 07:00 2.00 RUNCOMP RUNCMP Displace well to seawater @ 13 BPM 2000 psi. Slug pipe to
POH.
07:00 - 07:30 0.50 RUNCOMP RUNCMP PJSM: Lay down cement head, manfold and hoses, clear rg
floor and prepare rig for trip.
07:30 - 10:30 3.00 RUNCOMP RUNCMP Lay down dril pipe from 8492 to 4917 feet.
10:30 - 11 :30 1.00 RUNCOMP RUNCMP PJSM: Slip and cut drilling line.
11 :30 - 14:00 2.50 RUNCOMP RUNCMP POH laying down 4" drill pipe from 4917 to running tool. Lay
down XIO and landing joint.
14:00 - 15:00 1.00 RUNCOMP RUNCMP Make up mule shoe and run in hole to 2520' with excess 4" drill
pipe from derrick.
15:00 - 16:30 1.50 RUNCOMP RUNCMP Pull out of hole laying down 4" drill pipe from 2520 to mule
shoe.
16:30 - 17:00 0.50 RUNCOMP RUNCMP Make up joint pipe to pull wear bushing, pull and lay down joint.
17:00 - 18:00 1.00 RUNCOMP RUNCMP Test casing to 3500 psi chart and record as required.
18:00 - 19:00 1.00 RUNCOMP RUNCMP Clear rig floor and rig up to run casing. Review procedure and
hold PJSM.
19:00 - 00:00 5.00 RUNCOMP RUNCMP Run completion: Pick up WLEG, XN Nipple XIO and Baker
packer and RIH to 4534 feet.
4/27/2005 00:00 - 04:00 4.00 RUNCOMP RUNCMP PJSM: Pick up 4 1/2" Liner from 4534 to 8020 and make up to
4400 ft# torque.
04:00 - 04:30 0.50 RUNCOMP RUNCMP Make up hanger. Pick up 115,000#
Slack of weight = 105,000#
04:30 - 05:00 0.50 RUNCOMP RUNCMP Land hanger and run in lock down screws.
05:00 - 05:30 0.50 RUNCOMP RUNCMP Rig up circulation lines and test to 3000 psi.
05:30 - 08:30 3.00 RUNCOMP RUNCMP Circulate corrosion inhibitor at 3BPM 150 psi.
08:30 - 10:30 2.00 RUNCOMP RUNCMP Drop rod & ball to set packer.
Pressure up to 4500 psi to set packer.
Chart and hole 30 minutes. Bleed tubing to 1500 psi.
Pump up annulas to 3500 psi chart and hold test 30 minutes.
Bleed tubing and shear DCR valve
10:30 - 11 :00 0.50 RUNCOMP RUNCMP PJSM: set TWC. Test from below to 1000 psi
11 :00 - 11 :30 0.50 RUNCOMP RUNCMP Blow down all surface equipment
11 :30 - 13:00 1.50 RUNCOMP RUNCMP Nipple down BOP and stand back.
13:00 - 16:00 3.00 RUNCOMP RUNCMP Nipple up adaptor flange and test tree to 5000 psi.
16:00 - 17:00 1.00 RUNCOMP RUNCMP Rig up lubricator and pull TWC. Rig down lubricator.
17:00 - 21 :00 4.00 RUNCOMP RUNCMP Rig up lines to Little Red Services to circulate. Test lines to
3000 psi.
Reverse circulate 160 barrels diesel @ 2 bpm 500 psi.
U-tube well. Rig down lines release Little Red.
Remove outter annulas valve.
Printed: 5/2/2005 7:56:56 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-34B
F-34B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 4/12/2005
Rig Release: 4/27/2005
Rig Number:
Spud Date: 4/14/2005
End: 4/27/2005
4/27/2005
17:00 - 21 :00
4.00 RUNCOMP
RUNCMP
Install flange and secure well haed.
Rig released at 21 :00 hours.
Prepare rig for move.
Remove cellar doors and hard lines.
Move rig off well and start maintenance. Pull BOP stack from
cellar. Start pulling walls to remove tires.
4/28/2005
21 :00 - 22:30
22:30 - 00:00
00:00 - 06:00
1.50 RUNCOMP
1.50 RUNCOMP
6.00 DEMOB
RUNCMP
RUNCMP
POST
Printed: 5/2/2005 7:56:56 AM
.
.
F-34B
Prudhoe Bay Unit
50-029-21980-02-00
205-053
Accept
Spud:
Release:
04/14/05
04/17/05
04/27/05
Nabors 2ES
POST RIG WORK
05/10/05
PULLED BALL AND ROD AT 7974'SLM. PULLED DGLV FROM STA #4, PULLED DCK FROM STA #5. SET
GENERIC LGLV IN STA #5 AT 3231' SLM, SET GENERIC OGLV IN STA #4 AT 4957' SLM. PULLED RCH PLUG
BODY AT 7980' SLM. DRIFTED W/3 3/8" DUMMY GUN TO 8421' SLM (8450' CORRECTED) - SAMPLE
RECOVERED. RIH W/3" P. BAILER. SAT DOWN AT 8427' SLM. RECOVERED FULL BAILER OF DRILLING
MUD.
05/11/05
BAILED FROM 8429' SLM TO 8438' SLM W/3.0" BAILER (12 RUNS MADE TODAY). RECOVERED FULL
BAILERS ON EVERY RUN.
05/12/05
BAILED W/3" PUMP BAILER AT 8441' SLM. BAILERS 1/2 FULL OF FILL ON EACH RUN. DID NOT MAKE ANY
HOLE. STARTED BAILING AT 8421' SLM AT THE START OF THE JOB. BAILED DOWN TO 8441' SLM. TURN
WELL OVER TO DSO - LEFT WELL SHUT IN.
05/18/05
RIH FOR FCO. TAG AT 8483' - POSSIBLE TOP OF LINER. FCO TO AT 10792' CTM AND COULD NOT WASH
PAST. DID NOT ENCOUNTER ANY FILL AND RETURNS STAYED CLEAN DURING FCO. POOH AT 80%. FP
WELL TO 3500'. CT AT SURFACE. RDMO. JOB COMPLETE.
05/19/05
RIH W/2 1/8 DUMMY GUN TAG AT LINER TOP AT 8,435' SLM RAN 3.5 LIB. ROUGH ON TAPERED PART OF
LIB. RAN 3.18,2.80 CENT. TAG SAME PLACE 8,435' SLM. RAN 2.8 S-BAILER TAG AT 8,435' SLM.
RECOVERED 1/2 CUP FILL, RAN 2.25 BAILER, RECOVERED 1.5 GAL.
OS/20/05
BAIL FROM 8,435' TO 8,442' SLM.
OS/21/05
CIRCULATED COIL AND RECOVERED BOTH LOST BALLS. DROP 1.3" DRIFT BALL. PERFORM WEEKLY
BOP TEST. STAB OFF WELL. NO DRIFT BALL RECOVERED. DROP 1.125" BALL TO DISLODGE DRIFT
BALL. HEAR 2ND BALL HIT AFTER 30 BBLS METH AWAY. PUMP A TOTAL OF 50 BBLS. STAB OFF WELL.
NO BALLS RECOVERED. MU AND RIH WITH 2" JDN. STOP COIL AT 5605' CTMD, FOUND BAD SPOT IN
COIL. STAY PARKED AND PUMP 20 BBLS METH IN ATTEMPT TO MOVE BALLS DOWN TO END OF COIL.
POOH. POP OFF WELL. BOTH BALLS RECOVERED. BLOW DOWN REEL WITH N2. CUT OFF APPROX.
5950' OF COIL WITH HYDRAULIC TUBING CUTTER (14,500' REMAINING ON REEL). PREP TO RE-DRIFT
COIL.
OS/22/05
PUMPED 1.25" BALL TO DRIFT COIL. RECOVERED BALL. MU AND RIH WITH 2.5" JSN. SAT DOWN AT
8455' CTMD. PUH. RBIH AND JET THROUGH AREA AT TOP OF LINER. NOW ABLE TO TRIP DRY
THROUGH SAME DEPTH. PREP TO PUMP ACID. JET 90 BBLS OF 15% -90:10 DAD ACID IN STAGES FROM
8400' CTMD TO 10757' CTMD. CIRCULATE BOTTOMS UP. CIRCULATE WHILE POOH AT 80%. FREEZE
PROTECT TO 2500' WITH 40 BBLS 50/50 METHANOL. WELL SHUT IN. NOTIFY PAD OPERATOR OF WELL
STATUS. READY FOR SLlCKLlNE DfT PRE RST/PERF. JOB COMPLETE.
OS/23/05
DRIFT WITH 33/8" DUMMY. GUN SAT DOWN AT 10394' SLM (TARGET 10,750'). START RUNNING PUMP
AND DRIVE DOWN BAILERS.
F-34B, Post Rig Sidetrack work.
Page 2
.
OS/24/05
ATTEMPT TO BAIL FILL, BAILED -9' OF SANDY MUD TO 10399' SLM (TARGET 10750').
05/30/05
MU AND RIH WITH 2-1/2" JSN. SET DOWN AT 10420' CTMD. RBIH AND JET FILL. NO FURTHER FILL
ENCOUNTERED. TAG BTM AT 10768' CTMD. JET 4-1/2" LINER WITH HOT DIESEL FROM 8493' TO 10768'
CTMD. MAKE SEVERAL PASSES ACROSS 10420' CTMD WITH HOT DIESEL. MAKE FLOPRO SWEEP FROM
10420' TO 10768' CTMD.
05/31/05
BOTTOMS UP PUMPING 1% KCL WI 2% LUBETEX. POOH. MU AND RIH WITH SLB CNL. LOG 10776' TO
10100' CTMD AND 10776' TO 7300' CTMD. FLAG PIPE AT 10711' CTMD FOR TIE-IN. POOH. GOOD DATA,
TIE-IN TO SPERRY-SUN MWD ON 04/25/05 (-21 CORRECTION). TOWN GOC PICK 10517' CORRECTED. MU
AND RIH WITH SLB 2-7/8" PJ2906 PERF GUN. PERFORATE 25' INTERVAL, 4 SPF, FROM 10710' - 10735'
CORRECTED. POOH. MU AND RIH WITH SECOND SLB 2-7/8" PJ2906 PERF GUN. PERFORATE 25'
INTERVAL, 4 SPF, FROM 10685' - 10710' CORRECTED. POOH.
06/01/05
RIH WITH PDS GAMMA RAY I CCL. LOG FROM 10778' TO 10350' CTMD. FLAG PIPE AT 10700' CTMD. TIE-
IN TO SPERRY-SUN MWD ON 04/25/05 (-21 CORRECTION). MU AND RIH WITH THIRD SLB 2-7/8" PJ2906
PERF GUN. PERFORATE 25' INTERVAL, 4 SPF, FROM 10660' - 10685' CORRECTED. POOH. ASF MU AND
RIH WITH SAME FOR 4TH GUN RUN. SHOOT 10635' -10660'. POOH. ALL SHOTS FIRED. FREEZE
PROTECT WELL TO 2200' WITH 50/50 METH.
.
.
F-34B Sidewall Core Data
Depth ft
8140
8148
8153
8386
8383
8378
8376
8373
8366
8356
8336
8320
8314
8310
8306
8279
8275
8264
8255
8237
8234
8230
8222
Description
Sltst gry shy-vshy
Sltst gry shy-vshy
Sltst gry shy-vshy
Sltst gry shy-vshy
Shale blk slty
Sltst gry shy-vshy
Sltst gry shy lam(4)
Sltst dk gry vshy
Sltst gry vshy
Shale blk slty
Shale blk slty
Sltst gry vshy lam(4) c.
Sltst gry vshy-shy
Sltst gry shy lam(2)
Sltst gry vshy
Shale black sslty
Sltst gry shy-vshy
Sltst gry vshy
Sltst gry vshy
Shale black sslty
Sltst gry vshy
Sltst gry shy
Sltst gry shy
Halliburton Sperry-Sun
North Slope Alaska
BPXA
PBU WOA F Pad
F-34B
.
Job No. AKMW3649138, Surveyed: 24 April, 2005
Survey Report
13 May, 2005
Your Ref: API 500292198002
Surface Coordinates: 5974667.00 N, 651959.00 E (70020'16.1262" N, 148046' 01.0573" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 974667.00 N, 151959.00 E (Grid)
Surface Coordinates relative to Structure Reference: 2117.93 N, 1042.26 E (True)
Kelly Bushing Elevation: 64.38ft above Mean Sea Level
Kelly Bushing Elevation: 64.38ft above Project V Reference
Kelly Bushing Elevation: 64.38ft above Structure Reference
spea...,...,y-sul'"1
DR tl,..L.1 N G .. .§..§:!! YJç;;.Ei§
A'Halubunon Company
Survey Ref: svy4611
Halliburton Sperry-Sun
Survey Report for PBU_WOA F Pad· F-34B
Your Ref: API 500292198002
Job No. AKMW3649138, Surveyed: 24 April, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7476.72 35.300 27.950 6669.45 6733.83 2119.89 N 1122.69 E 5976809.20 N 653038.51 E 2396.22 Tie On Point
MWD Magnetic
7500.00 35.310 29.280 6688.45 6752.83 2131.70 N 1129.14 E 5976821.14 N 653044.71 E 3.302 2409.65 Window Point
7555.68 40.220 28.880 6732.45 6796.83 2161.49N 1145.70 E 5976851.26 N 653060.66 E 8.829 2443.67
7649.73 40.460 28.290 6804.14 6868.52 2214.95 N 1174.83E 5976905.30 N 653088.70 E 0.480 2504.44
7741.19 40.210 27.710 6873.86 6938.24 2267.22 N 1202.62 E 5976958.12 N 653115.43 E 0.493 2563.57
7836.21 39.910 27.110 6946.58 7010.96 2321.51 N 1230.77 E 5977012.97 N 653142.48 E 0.515 2624.68 .
7929.15 40.010 29.230 7017.82 7082.20 2374.12 N 1258.95 E 5977066.14 N 653169.58 E 1.469 2684.29
8022.17 40.030 28.920 7089.06 7153.44 2426.40 N 1288.02 E 5977119.00 N 653197.58 E 0.215 2743.97
8117.35 39.760 28.300 7162.08 7226.46 2479.99 N 1317.25E 5977173.18 N 653225.72 E 0.505 2804.91
8209.88 40.100 29.560 7233.04 7297.42 2531.97 N 1345.98 E 5977225.72 N 653253.40 E 0.948 2864.17
8303.03 40.970 30.160 7303.83 7368.21 2584.47 N 1376.13 E 5977278.82 N 653282.47 E 1.023 2924.51
8395.35 40.160 29.340 7373.97 7438.35 2636.59 N 1405.92 E 5977331.54 N 653311.20 E 1.050 2984.36
8490.36 40.660 29.270 7446.31 7510.69 2690.30 N 1436.06 E 5977385.84 N 653340.25 E 0.528 3045.80
8583.65 41.190 28.360 7516.80 7581.18 2743.84 N 1465.52 E 5977439.97 N 653368.61 E 0.855 3106.79
8675.04 40.940 28.210 7585.70 7650.08 2796.71 N 1493.96 E 5977493.41 N 653395.98 E 0.294 3166.74
8769.84 40.470 27.000 7657.57 7721.95 2851.49 N 1522.61 E 5977548.76 N 653423.52 E 0.969 3228.51
8865.11 40.780 28.080 7729.88 7794.26 2906.49 N 1551.30E 5977604.33 N 653451.08 E 0.807 3290.49
8957.56 41.350 27.470 7799.58 7863.96 2960.22 N 1579.60 E 5977658.63 N 653478.28 E 0.754 3351.16
9051.18 41.060 27.810 7870.02 7934.40 3014.86 N 1608.21 E 5977713.83 N 653505.78 E 0.391 3412.78
9143.78 40.600 28.110 7940.08 8004.46 3068.34 N 1636.59 E 5977767.87 N 653533.08 E 0.540 3473.25
9236.58 40.120 27.210 8010.80 8075.18 3121.56N 1664.49 E 5977821.65 N 653559.89 E 0.814 3533.29
9330.91 40.250 28.570 8082.86 8147.24 3175.36 N 1692.96.E 5977876.01 N 653587.27 E 0.940 3594.09
9424.01 41.180 28.980 8153.43 8217.81 3228.58 N 1722.20 E 5977929.82 N 653615.42 E 1.039 3654.70 .
9517.54 40.500 28.840 8224.19 8288.57 3282.12 N 1751.17 E 5977983.95 N 653643.89 E 0.734 3715.74
9611.72 39.390 29.140 8296.39 8360.77 3335.02 N 1781.07E 5978037.42 N 653672.12 E 1.196 3776.08
9704.58 38.740 28.000 8368.49 8432.87 3386.41 N 1809.06 E 5978089.37 N 653699.06 E 1.043 3834.50
9798.30 42.660 24.760 8439.54 8503.92 3441.16 N 1836.14E 5978144.66 N 653725.03 E 4.750 3895.57
9891.89 44.790 20.620 8507.18 8571.56 3500.83 N 1861.04E 5978204.83 N 653748.71 E 3.811 3960.16
9985.89 46.590 17.600 8572.85 8637.23 3564.38 N 1883.03 E 5978268.81 N 653769.41 E 2.992 4027.02
10056.25 48.960 17.150 8620.13 8684.51 3614.10 N 1898.58 E 5978318.84 N 653783.95 E 3.402 4078.63
10186.21 50.970 10.960 8703.77 8768.15 3710.56 N 1922.65 E 5978415.76 N 653806.06 E 3.960 4176.14
10220.24 53.420 4.860 8724.64 8789.02 3737.17N 1926.32 E 5978442.44 N 653809.19 E 15.883 4201.77
10251.95 54.420 4.070 8743.32 8807.70 3762.72 N 1928.31 E 5978468.02 N 653810.67 E 3.742 4225.74
10280.55 56.550 3.670 8759.52 8823.90 3786.23 N 1929.90 E 5978491.56 N 653811.78 E 7.536 4247.68
10316.25 57.320 4.150 8779.00 8843.38 3816.08 N 1931.94E 5978521.44 N 653813.21 E 2.433 4275.55
13 May, 2005 - 16:06
Page 2 of 4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for PBU_WOA F Pad - F-34B
Your Ref: API 5(JP292198002
Job No. AKMW3649138, Surveyed: 24 April, 2005
North Slope Alaska BPXA
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
10347.90 58.780 6.130 8795.75 8860.13 3842.82 N 1934.35 E 5978548.23 N 653815.08 E 7.032 4300.77
10374.56 60.960 6.460 8809.13 8873.51 3865.74 N 1936.88 E 5978571.19 N 653817.15 E 8.247 4322.58
10406.89 62.760 6.290 8824.38 8888.76 3894.07 N 1940.05 E 5978599.58 N 653819.74 E 5.587 4349.55
10465.89 64.480 8.170 8850.59 8914.97 3946.50 N 1946.70 E 5978652.14 N 653825.33 E 4.080 4399.82
10558.78 64.750 8.630 8890.41 8954.79 4029.52 N 1958.96 E 5978735.39 N 653835.90 E 0.534 4480.14
10651.96 65.020 6.010 8929.97 8994.35 4113.19 N 1969.71 E 5978819.26 N 653844.95 E 2.562 4560.41 .
10746.49 64.500 3.780 8970.28 9034.66 4198.38 N 1977.01 E 5978904.58 N 653850.52 E 2.204 4640.58
10794.54 62.120 3.910 8991.86 9056.24 4241.21 N 1979.89 E 5978947.46 N 653852.53 E 4.959 4680.54
10850.00 62.120 3.910 9017.80 9082.18 4290.12 N 1983.23 E 5978996.43 N 653854.88 E 0.000 4726.21 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well Reference and calculated along an Azimuth of 25.23r (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10850.00ft.,
The Bottom Hole Displacement is 4726.34ft., in the Direction of 24.810° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
7476.72
7500.00
10850.00
6733.83
6752.83
9082.18
2119.89 N
2131.70 N
4290.12 N
1122.69 E
1129.14 E
1983.23 E
Tie On Point
Window Point
Projected Survey
13 May, 2005 - 16:06
Page 3 of4
DrillQuest 3.03.06.008
Halliburton Sperry-Sun
Survey Report for PBU_WOA F Pad - F-34B
Your Ref: API 500292198002
Job No. AKMW3649138, Surveyed: 24 April, 2005
North Slope Alaska
BPXA
Survey tool proqram for F-34B
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
7476.72
0.00 7476.72
6733.83 10850.00
6733.83 BP High Accuracy Gyro - GCT-MS (F-34)
9082.18 MWD Magnetic (F-34B)
.
.
13 May, 2005·16:06
Page 4 of4
DrillQuest 3.03.06.008
~
'#\ ..
133/8",68.0#,
..
II 2,689 I
..
~
5
4
3
2
1
~
H
H
1/2" Liner 9,648 ~
, 47.0#. L-80, /1 I At ...
9,892
I~n~:'" 17.0#, L-80,11 10,555 I
REV BY
07/08/96
04/28/05
05/08/05
.
AOGCC
Helen Warman
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
DEFINITIVE
Re: Distribution of Survey Data for Well F-34B
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
7,476.72' MD
7,500.00' MD
10,850.00' MD
(if applicable)
13-Jun-05
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ~7Jv¡S Àf~ 1-
Signed
2Li~
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
IS (~ ) () r - ß )-1
Phil,
No permit revision is required prior to completion. Please submit the actual completion scheme with the
completion report.
Thanks,
Winton
Smith, Phil G (ASRC) wrote:
Winton,
There is a Sierra-Nevada sand package on top of the HRZ on the next 2ES sidetrack. The Geo's are
asking for some OHL's and sidewall cores now and a change in the completion as specified below, if the
sand is indeed worth saving. Would we need to submit a revised 10-403 before completing if the sand
proves up, or can we wait until the rig completes the well?
Thanks,
Phil
*From: * Jenkins, Christopher N *Sent: * Monday, April 04, 2005 2:56 PM
*To: * Smith, Phil G (ASRC)
*Subject: * F-34B TENTATIVE completion plans
Phil,
Here is the TENTATIVE mandrel spacing design for F-34B should the Sierra Nevada look interesting
enough to make us want to preserve access. For this design, we assumed a* packer depth of 8077' MD
(-200' MD above the top of Sierra Nevada, to allow room for the tailpipe)*. We'd like to minimize the
amount of 7" interval in the well to better our hydraulics, so we'd like set our 4-1/2" liner top at -8350' MD
(bottom of Sierra Nevada is -8330' MD). We probably need to add wireline entry guides to facilitate
entry into the liner and tubing tail.
Let me know if you have any questions/concerns about these plans.
Thanks,
Chris
*From: * GPB, Gas Lift Engr *Sent: * Friday, March 25, 2005 5:54 AM
*To: * Jenkins, Christopher N
*Subject: * F-34B Second Mandrel Spacing Revision
Chris,
Again, my apologies for the oversight and subsequent mix up. Here are the new mandrel depths for
F-34B.
*
* Station
Number
*5
Depth
MD
3255
Depth
TVD
3250
Mandrel*
Size & Type*
4-1/2" X 1-1/2"
*
~
.
4750
5600
6400
4 4986
3 6048
2 7066
1 Liner Top 7350
1 7987 7150
Call if there are any questions or concerns.
Thanks,
/Larry Bulat!
IArctic Lift Systems, Inc.l
GPB, Gas Lift Eng.
659-5863
659-3423 Pager
4-1/2" X 1-112"
4-112" X 1-112"
4-112" X 1-112"
---------------1
4-112" X 1" * *
.
· .
~ :Y{Æ.ß ~ If rID t' fÆ:l fS\ ~~ ~ LfùÆ\/
! f i<--,/'"ll U :¡\\¡ /
... . _ '-" u U ¡....J U ~
AI#ASIiA. OIL AlVD GAS
CONSERVATION COMMISSION /
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: F-34B
BP Exploration (Alaska) Inc.
Permit No: 205-053
Surface Location: 2133' FNL, 2412' FWL, SEC. 02, T11N, R13E, UM
Bottomhole Location: 2091' FSL, 4408' FWL, SEC. 35, T12N, R13E, UM
Dear Mr. Isaacson:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. ase provide at least twenty-four (24)
hours notice for a representative of the Commissio . to 'tness any required test. Contact the
Commission's petroleum field inspector at (907) 6 ~3 (pager).
w~IY'
nK.
~}tI~ Ch"
DATED thiêl day o~ 2005
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Govemmental Section):
Surface:
2133' SNL, 2412' EWL, SEC. 02, T11N, R13E, UM /
Top of Productive Horizon:
1547' NSL, 4323' EWL, SEC. 35, T12N, R13E, UM
Total Depth:
2091' NSL, 4408' EWL, SEC. 35, T12N, R13E, UM /
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 651959 y- 5974667 Zone- ASP4
16. Deviated Wells: Kickoff Depth: 7500 feet
Maximum Hole Angle: 62 degrees
'v.I4A- '3/~ I2.CO~
. STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION COMMISSI<RF~EIVED
PERMIT TO DRILL MÞ,R 2 9 2005
20 AAC 25.005 / . .
1b. Current Well Class 0 Exploratory ."_.~ill..(U.~(II~8KU'
o Stratigraphic Test 0 Service 0 DevelopmTial:1MrJ¡tSingle Zone
5. Bond: a Blanket 0 Single Well 11. Well Name and Number:
Bond No. 2S100302630-277 PBU F-34B /'
6. Proposed Depth: 12. Field I Pool(s):
MD 10779 TVD 9060 Prudhoe Bay Field I Prudhoe Bay
7. Property Designation: Pool
ADL 028277
8. Land Use Permit:
13. Approximate Spud Date:
April 10, 2005 ~/
14. Distance to Nearest Property:
5,830'
9. Acres in Property:
2560
18. Casing Program:
Size
Casing
7"
Hole
8-1/2"
6-1/8"
4-1/2"
Weight
26#
12.6#
Specif~tiQns
Grade Coupling
L-80 BTC-M
13Cr80 Vam-Top
Lenç¡th
2645'
784'
10. KB Elevation 15. Distance to Nearest Well Within Pool
(Height above GL): 65.10 feet F-14 is 1150' away at 10140' MD
17. Maximum Anticipated Pressures in psig (see 20 MC 25.035)
Downhole: ~ I (pO \UG4- Surface: 'L 270 Iu'GIf-
Setting Qepth .... ·.Oua"tiìy.ofCernent
Top . Bottom . . (c.f.orsacks)
MD TVD MD TVD (including stage data)
7500' 6753' 10145' 8740' 281 cu ft Class 'G'
9995' 8642' 10779' 9060' 132 cu ft Class 'G'
19. PRESENTWELL CONDITION SUMMARY (To be completed for RedrillAND He-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): I Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1
12087 8855 None 11997 8861
Casing Length Size Cement Volume MD
Structural
Conductor
Surface
Intermediate
Production
_Liner
Junk (measured):
None
TVD
110'
2689'
8303'
20"
13-3/8"
9-518"
3723 cu ft Permafrost
2059 cu ft Class 'G'
110'
2689'
8303'
110'
2689'
7409'
Liner
2795'
1301'
7"
575 cu ft Class 'G'
197 cu ft Class 'G'
8125' - 10920'
10786' - 12087'
7263' - 8692'
8633' - 8855'
4-1/2"
20. Attachments IS Filing Fee, $100 0 BOP Sketch
o Property Plat 0 Diverter Sketch
IPerfOration Depth TVD (ft): 8849' - 8862'
IS Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report a Drilling Fluid Program IS 20 MC 25.050 Requirements
Date:
Perforation Depth MD (ft): 11350'· 11985'
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name BiIIlsaacson Title Senior Drilling Engineer
Signature ~~ t/'L B;tL :C's..<1.r.<"C4- Phone 564-5521
Commission Use Only
Permit To Drill I API Number: I Permit Approval
Number: 20£ - 0.£. ~ 50- 029-21980-02-00 Date:
Conditions of Approval: Samples Required Yes ¡g No Mud Log Required
_ . . H~ Sulfide Me~sures g-Yes n No Directional Survey Required
Other: \ -tçt;- PEfYi SOO fSt.
Contact Phil Smith, 564-4897
Date
2>Þ~~
Prepared By Name/Number:
Terrie Hubble, 564-4628
I See cover letter for
other requirements
[J Yes J8No
'gYes LJ No
OR\G\~JAL
APPROVED BY
THE COMMISSION
Date ~ ¿if:::
.
.
I Well Name: I
F-348
Planned Well Summary
Well
F-34B
Well
Type
Conventional
Sidetrack
Producer
Target
Objective
Zone 4
I AFE Number: I PBD 4P2359 I
I API Number: I 50-029-21980-02
Surface I Northing I Easting I Offsets
Location 5,974,666.88 651,958.42 2133' FNL/2412' FWL
TRS
11 N, 13 E, 2
Target I Northing I Easting I Offsets
Location 5,978,385.00 653,790.00 1547' FSL I 957' FEL
I TRS I
12 N, 13 E, 35
Bottom I Northing I Easting I Offsets I TRS I
Location 5,978,930.00 653,864.00 ~L/~ 12 N, 13 E, 35 *
.zð71Ír/Sf../t¡t¡ot ~«./L h¿ ,Ø;/Q!:'"
I Planned KOP: 17,500' md I 6,753' tvd I I Planned TD: 110,779' md I 9,060' tvd I
I Rig:
/"-,
/ I
1 Naborc:9 1
I CBE:
136.60'
I RTE:
165.10'
Approved Well plan:
Maximum Hole Inclination:
Proximity Issues:
Survey Program:
Nearest Well within pool:
Nearest Property Line
Directional Proaram
Wp01 I Exit point: I 7,500' md /6,688' sstvd
-620 in the planned 6 1/8" production section.
There are no close approach issues in drilling F-34B. All surrounding wells
pass major risk criteria.
Standard MWD.
Well F-14, with center-to-center distance of. -1150' at 10,140' md.
5,830' to the nearest PBU property line. /
F-34B Sidetrack
Page 1
Hole Section:
81/2" intermediate:
6 1/8" production:
Cased Hole:
Open Hole:
.
.
Loac:lina Proaram
Required Sensors I Service
Real time MWD Dir/GR/PWD throughout the interval
Real time MWD Dir/GR/Res throughout the interval. Two sample catchers.
RST log Post-Rig
None planned
Mud Proaram
Type
LSND
Hole Section I operation:
I Density (ppg) I Viscosity I PV
11 .4 50 - 60 1 0 - 15
Mill window in the 9 5/8" casing at -9,650' md.
YP I Tau 0 I API FL I pH
40+ 3 - 7 5 - 7 9.0 - 9.5
Type
LSND
Hole Section I operation:
I DensiW-(ppg) I Viscosity I
~ 45-55
PV
14 - 20
Drilling 8 1/2" interval from window to section TD
YP I Tau 0 I API FL I pH
16 - 26 3 - 7 4 - 5 9.0-10.0
Type
Flo-Pro
Hole Section I operation:
I Density (ppg) I Viscosity I
8.5 - 8.6 45 - 55
PV
8-12
Drilling 6 1/8" production interval
YP I MBT I API FL
~-w ~ 4-6
pH
9.0 - 9.5
Casina I Tubina Proaram
Hole CasinglTubing Wt. Grade ConnecyPh Length Top
Size Size / md I tvd
81/2" 7" 26.0# L-80 BTC-M 2,645' 7,500' I 6,753'
61/8" 4}2" 12.6# 13Cr-80 Yam-Top 784' 9,995'/8,642'
Tubing 4 Y2" 12.6# 13Cr-80 Yam-Top 9,975' Surface
Casing String:
Slurry Design Basis:
Fluids Sequence I Volume:
Casing String:
Slurry Design Basis:
Fluids Sequence I Volume:
F-34B Sidetrack
Bottom
md I tvd
10,145' 18,740'
10,779' I 9.060'
10,000'/8,644'
Cementina Proaram
7", 26#, L-80, BTC-M long string
Lead slurry: None planned.
Tail slurry: 1000' of 7" X 81/2" annulus with 40% excess, plus -86' of 7",
26.0#, shoe tract
Pre-Flush None planned
Spacer 35bbls MudPUSH at 12.4ppg
Lead Slurry None planned ............-.. _"',
Tail Slurry 50.0bbl I 281cf 0~sx Class 'G', 15.8Ppg;~1!'cf/sk.
41/2",12.6#, 13CR-80, Yam Top solid production liner
Lead slurry: none planned
Tail slurry: 634' of 41/2" X 61/8" annulus with 40% excess, plus 85' of 4 1/2",
12.6# shoe track, plus 150' of 7" X 4 }2" liner lap, plus 200' of 7" X 4" drill pipe
annulus.
Pre-Flush
Spacer
Lead Slurry
Tail Slurry
25bbls CW 100
35bbls MudPUSH at 9.6ppg
None planned . /,,'.
23.5 bbl 1132 cf ~~sx Class 'G', 15.8PP9(fß cf/sk.
Page 2
.
Test
9 5/8" casing
9 5/8" casing window
7" casing
7" casing shoe
4 W' production liner
.
Casinq I Formation Inteqritv Testinq
Test Point
Bridge plug to surface
20' new formation beyond
Float equipment to surface
20' new formation beyond
Float equipment to surface
Test Type
30 min recorded
FIT
30 min recorded
FIT
30 min recorded
Test pressure
3,500psi surface
12.5ppg EMW
3,500psi surface
10.Oppg EMW
3,500psi surface
./
Well Control
Well control equipment consisting of 5,000psi working pressure pipe rams (2), blindlshear rams, and an
annular preventer will be installed and is capable of handling maximum potential surface pressures. The
ram configuration will be:
BOPE and drilling fluid system schematics are currently on file with the AOGCC.
Well Interval:
Maximum anticipated BHP:
Maximum surface pressure:
Calculated kick tolerance:
Planned BOPE test pressure:
BOPE configuration for 7"
drilling liner.
Well Interval:
Maximum anticipated BHP:
Maximum surface pressure:
Calculated kick tolerance:
Planned BOPE test pressure:
Planned completion fluid:
8 1/2" intermediate interval
3,160psi at 8,700' sstvd.
2,270psi (based upon BHP and a full column of gas from TD @ 0.10 pSilft)
Infinite with 12.5 ppg EMW FIT
250psi low I 3,500psi high - 7 day test cycle (Pre drilling phase)
Variable Bore Rams will remain installed, rather than cia to 7" pipe rams.
The rig will follow the current, best practice of picking up a joint of drill
pipe, crossed over to casing thread, in the event of a kick. This
configuration provides two sets of employable rams, rather than one.
./
6 1/8" production interval
3,150 psi at 8,800' sstvd.
='. si (based upon BHP and a full column of gas from TD@0.1 0 psi/ft)
I fi . e with 10.Qppg EMW FIT.
si low I ~500psi high - 14 day test cycle (Drilling operations)
8.4ppg seaw~1 7.1 ppg ~iesel
./
Disposal
Annular Injection:
Cuttings Handling:
Fluid Handling:
No annular injection in this well.
Cuttings generated from drilling operations are to be hauled to the Grind and Inject
station at OS-04. Any metal cuttings should be sent to the North Slope Borough.
All drilling and completion fluids and other Class II wastes are to be hauled to OS-04
for injection. All Class I wastes are to be hauled to Pad 3 for disposal.
F-34B Sidetrack
Page 3
.
.
GeoloQic ProQnosis
Formation MD TVDbkb TVDss Comments
CM2 Above Kickoff
Logs Start 7215 7150
CM1 7277 7212
THRZ 7385 7320
BHRZ 7467 7402
Top Kingak 7467 7402
TJF 7825 7760
TJE 7995 7930
TJD 8239 8174
TJC 8476 8411
TJB 8604 8539
Sag River 8745 8680
Shublik 8650 8585
TSAD / TZ4B 8875 8810
PGOC 8915 8850
TZ4A142N 8925 8860
POWC 8965 8900
TCGL/TZ3 8965 8900
BCGLlTZ2 9040 8975
MHO/HOT 9070 9005 Below TD
25N / T2B 9085 9020 "
TZ1B 9135 9200
I TD Criteria: I 200' MD below POWC, including 100' for the shoe track.
Operations SUmmary
Current Condition:
1 . There is T X IA communication. LDL determined leaks at -9,767', 10,019', and 10,073'. (9/30/02)
2. There is an 'XX' TTP set in the lower 'X' nipple at 10,739' SLM (10,758' tally). TTP set 1/02/03.
3. AN MITOA to 2000 psi failed on 1/17/05 with LLR of 0.5 gpm (120 psi loss in 15 minutes).
Pre-Riq Operations:
1. R/U slick-line. RIH and retrieve the TTP from the 'X' nipple at 10,739' SLM.
2. R/U coiled tubing. RIH and plug and abandon the open perforations. Leave top of cement at -10,650'.
The cement volume required is -30.0bbls. This is based upon 1,212' of 4 W', 12.6# liner, and 135' of
4 W', 12.6#, tubing, and approximately 10.0bbls to squeeze the open perforations.
3. Drift the 4 W' tubing to top of cement plug at -10,650'md, below the planned tubing cut depth of
-7,700'md. Confirm top of cement.
4. R/U SWS E-line. RIH with appropriate chemical cutter and cut the 4 W' tubing at -7,700'md.
5. Circulate the well to seawater through the tubing cut, until returns are clean. Conduct a CMIT T X IA to
3,000psi for 30 minutes.
6. Freeze protect to -2,200' MD with diesel.
7. Bleed casing and annulus pressures to zero.
8. Function all casing and tubing LDS and re-torque as recommended by Cameron. Test 9 5/8" packoff.
9. Set a BPV. Secure the well. Remove the well house and flow line. Level the pad as necessary.
F-34B Sidetrack
Page 4
.
.
RiQ Operations:
1. MI I RU Nabors 2ES.
2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. Install TWC.
3. Nipple down the tree. Inspect tubing hanger threads.
4. Nipple up and test BOPE to 3,500psi. R/U DSM lubricator and pull TWC.
5. R/U. Pull the 4 W' tubing from the tubing cut at -7,700'md and above. Be prepared to spool up the
HES SSSV control line.
6. R/U SWS E-line and drift to the EZSV setting depth. M/U a HES 9 5/8" EZSV bridge plug. RIH with
EZSV and set at -7,520'md. POOH and RID E-line.
7. R/U and pressure test the 9 5/8" casing to 3,500psi for 30 minutes. Record the test.
- 8. M/U a Baker 9 5/8" whip stock assembly. RIH to the EZSV bridge plug. Orient as desired and set the
whip stock on the EZSV.
9. Shear free from the whip stock. Displace the well to 11.4ppg LSND milling fluid.
--rl'< y 10. Mill a, window in the 9 5/8" casing at -7,500'md. Drilllmill approximately 20 feet beyond the middle of /'
11MS \O·t\ð( the window.
, 11. Circulate the well clean. Pull into the 9 5/8" casing and attempt an FIT to 12.5ppg EMW. POOH.
Ofpnlllw(. 12. M/U an 8 W' Dir/GR/Res/PWD assembly. RIH to the window.
13. Drill out and drill ahead, according to the directional program to section TD at the top of the Sag River.
Circulate and condition the hole. POOH.
14. Run and cement the 7" liner. POOH with liner running tool. /
15. M/U a 61/8" Dir/GR/Res drilling assembly.
16. RIH to the drilling liner float equipment.
17. Test the casing X liner to 3,500psi. Record the test.
18. Drill out the drilling liner float equipment to the liner shoe. Displace the well to 8.5ppg Flo-Pro drilling
fluid.
19. Drill out the shoe plus -20 feet of new formation. Conduct an FIT to 10.0ppg EMW. ../
20. Drill ahead, per directional proposal, to section TD at -10,779'md.
21. Condition the hole for running 41/2",12.6#, 13Cr-80, VAM TOP liner. POOH. ../
22. Run and cement the 4 W' production liner, extending the liner lap to -9,995'md. POOH.
23. R/U and pressure test the casing X liner to 3,500psi. Record the test.
24. R/U and run a 4 1/2", 12.6#, 13Cr-80, VAM TOP completion, stinging into the 4 1/2" liner tie back /'
sleeve.
25. Space out and land the completion. RILDS.
26. Reverse circulate the well to seawater with Corrosion Inhibitor.
27. Drop the ball and rod. Set the packer and individually test the tubing and annulus to 3,500psi for 30 //
minutes. Record each test. Shear the DCR valve in the uppermost GLM.
28. Install a TWC.
29. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. Pull TWC.
30. R/U LRHOS. Reverse in sufficient volume of diesel to freeze-protect the well to -2,200'md. Allow the/
diesel freeze protection fluid to U-tube to equilibrium.
31. Install BPV. Secure the well.
32. Rig down and move off.
/
Post-RiQ Operations:
1. MI I RU slick line. Pull the ball and rod I RHC plug from landing nipple below the production packer.
2. MI I RU SWS E-line. RIH and perforate per subsurface team. /
3. Install gas lift valves.
4. Re-install the well house, instrumentation, and flow line.
F-34B Sidetrack
Page 5
.
.
Phase 1: Move In I Riq Up I Test BOPE
Planned Phase Time
24 hours
Planned Phase Cost
$60,177
Reference RP
.:. "Drilling/Work-over Close Proximity Surface and Subsurface Wells Procedure" SOP
Issues and Potential Hazards
).- No wells will require shut-in for the rig move onto F-34A. However, F-12 is 35' to the North, and F-
11 is 75' to the South. These are the closest neighboring wells. Care should be taken while
moving onto the well. Spotters should be employed at all times.
).- During MI/RU operations, the F-34A well bore will be secured with the following barriers:
o Tubing: the cement P&A plug, kill weight fluid, and a BPV.
o IA: Annulus valves and kill weight fluid.
o OA: Annulus valve and kill weight fluid.
).- Prior to pulling the tree, verify there is a static column of brine to surface and that no pressure
exists.
).- During ND/NU BOPE operations, the F-34A well bore will be secured with the following barriers:
.:. Tubing: the cement P&A plug, kill weight fluid, and a BPV/blanking plug.
.:. IA: Annulus valves and kill weight fluid.
.:. OA: Annulus valve and kill weight fluid.
).- F-Pad is J1J1Ldesignated as an H25 site, though two wells in the past have produced 100 ppm
(F-24 and F-39) both wells are currently below the 100-ppm threshold that defines anH2S pad.
Recent H2S data from the pad is as follows:
Closest well to SHL Latest H2S reading / Closest well to BHL Latest H2S reading
F-12 10ppm F-22 N/A
F-11 10ppm F-14 N/A
The maximum H2S level currently on the Pad F-39 &PM (12/10/04)
Y"
~ Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud
F-34B Sidetrack
Page 6
.
.
Phase 2: De-complete Well
Planned Phase Time
43 hou rs
Planned Phase Cost
$145,903
Reference RP
.:. "De-completions" RP
Issues and Potential Hazards
Þ- Monitor the well to ensure the fluid column remains static, prior to pulling the completion.
Þ- Have all wellhead and completion equipment NORM-tested, following retrieval.
Þ- This wellhead is a McEvoy Big Bore Split Speed head. Check Cameron records for running thread
design.
Þ- Once the stack has been nippled down, verify the hanger thread and type in preparation for de-
completion. Be prepared with the appropriate tubing spear, in the event it becomes necessary.
Þ- There is a 4%" HES BVN with a W' control line. There were no records indicating the number of
control lines bands used.
Þ- Run GR/CCL Log from the bridge plug setting depth to surface after setting the EZSV.
. Phase 3: Run Whip Stock
Planned Phase Time
30 hours
Planned Phase Cost
$236,226
Reference RP
.:. "Whip stock Sidetracks" RP
Issues and Potential Hazards
Þ- The 9 5/8" casing was cemented with 273 bbls of 13.2 ppg lead and 102 bbls of 15.8 ppg tail.
Based on 30% washout, top lead slurry would be ±4700' and top tail at 8500' MD. The 9 5/8"
casing should be cemented at the planned KOP.
Þ- Once milling is complete, make sure all BOP equipment is operable. Follow standard rig
procedure in thoroughly cleaning all areas in which metal cuttings may have settled
Phase 5: Drill 8 1/2" Intermediate Hole Interval
Planned Phase Time
90 hours
Planned Phase Cost
$507,868
F-34B Sidetrack
Page 7
.
.
Reference RP
.:. "Shale Drilling, Kingak and HRZ" RP
.:. "Prudhoe Bay Directional Guidelines"
.:. "Lubricants for Torque and Drag Management" RP
Issues and Potential Hazards
þ> Must tie MWD - GR back to GR-CCL run during the de-completion phase. No other shallow logs
exist for this well.
þ> For this well, the HRZ will require a mud weight of 11.4ppg. Maintain mud weight at 11.4ppg,
minimally, from above the HRZ to the 7" casing point. Follow all shale drilling practices to
minimize potential problems.
þ> In the worst-case scenario of 8.6ppg pore pressure at the Ivishak depth, a
.5ppg at the 9 5/8" casing window, and 11.4ppg mud in the hole, the kick
Phase 6: Run and Cement 7" Intermediate CasinCl
Planned Phase Time
24 hours
Planned Phase Cost
$213,452
Reference RP
.:. "Intermediate Casing and Cementing Guidelines" RP
.:. "Freeze Protecting an Outer Annulus" RP
.:. "Shale Drilling, Kingak and HRZ" RP
Issues and Potential Hazards
þ> Swab and surge pressure should be minimized with controlled casing running speeds and by
breaking circulation slowly. Excessive swab / surge pressures could initiate HRZ / Kingak
instability problems.
þ> Differential Sticking is potentially a problem if lost circulation occurs or if the casing is left
stationary across permeable formations. Proper casing centralization will facilitate minimizing the
potential for differential sticking.
Phase 7: Drill 6 1/8" Production Hole Interval
Planned Phase Time
40 hou rs
Planned Phase Cost
$282,888
Reference RP
.:. "Standard Operating Procedure: Leak-off and Formation Integrity Tests"
.:. "Prudhoe Bay Directional Guidelines" RP
F-34B Sidetrack
Page 8
.
.
Issues and Potential Hazards
~ An objective of this drilling proposal is to complete this well with 50 feet of perforations in quality
Zone 4 sand. The well may include perforations in upper Zone 3 if the OWC occurs in Zone 3.
~ F-34B is expected to cross a single, small fault at the Shublik depth. The F-34 parent well bore
penetrated the same fault mapped at TSHU and no losses were recorded.
~ No significant thinning section recorded above Shublik which indicates the throw of this fault is
minor. There is a high possibility that this fault dies out and did not reach the new wellbore.
~ Hard lines for the drilling polygon include: 1) ALL POLYGON LINES ARE HARDLlNES. To the
north there area 200 ft away from E-W fault trend (30ft throw), this also applied to the east and
west side. The southern part is determined by the distance to the original F-34 wellbore.
Phase 9: Run 4%" Production Liner
Planned Phase Time
24 hours
Planned Phase Cost
$222,861
Reference RP
.:. "Modified Conventional Liner Cementing" RP
.:. "Use of 13-Cr Tubulars"
.:. "Running and Handling 13-Cr"
Issues and Potential Hazards
~ The completion design is to run a 4 W', 12.6#, 13Cr-80 solid liner throughout the production
interval.
~ Differential sticking is possible. The 8.6ppg Flo-Pro will be -600psi over balanced to the Ivishak
Zone 2 formation. Minimize the time the pipe is left stationary while running the liner.
~ Sufficient 4 W' liner will be run to extend -150' back up into the 7" liner shoe.
~ Ensure the 4 W' liner top packer is set prior to POOH.
Phase 12: Run 4 %" 13CR-80 Completion
Planned Phase Time
24 hours
Planned Phase Cost
$450,489
Reference RP
.:. "Completion Design and Running" RP
.:. "Tubing connections" RP
.:. "Use of 13-Cr Tubulars"
.:. "Running and Handling 13··Cr"
Issues and Potential Hazards
~ Diesel will be used to freeze protect the well. The diesel flash point is 100° F. Diesel vapor
pressure is - 0.1 psia at 100° F.
F-34B Sidetrack
Page 9
.
.
)ò> The completion, as designed, will be to run a 4%,',12.6#, 13CR-80, VAM TOP production tubing
string, stinging into the 4 %" liner tieback sleeve.
Phase 13: ND/NU/Release Riq
Planned Phase Time
16 hours
Planned Phase Cost
$51,618
Reference RP
.:. "Freeze Protecting an Inner Annulus" RP
Issues and Potential Hazards
)ò> No wells will require shut-in for the rig move off of F-34B. However, F-12 is 35' to the North, and
F-11 is 75' to the South. These are the closest neighboring wells. Care should be taken while
moving onto the well. Spotters should be employed at all times.
--
F-34B Sidetrack
Page 10
F-348 P"posed Compl.on
2,200 1-[41/2" 'X' nipple, ID = 3.813"
TREE =
WELLHEAD =
AciuA fOR =
kB. 'ËlÐï-;;'
BF:ËlÐï;;'
KOP=
, ~~mc ~
Max Angle =
DatumMÓ;;'
Datum rvD =
4" McEVOY
McEVOY
BAKER
65.6'
36:62'
3086'
'-94 @12003'
.. ~ Hi??'
8800'SS
Gas Lift Mandrels
113 ~/8". 68.0#, L-80, 11 =::¡ ST MD rvD DEV TYÆ VALVE LATCH
2,689 5 TBD TBD TBD 4 1/2" X 1 1/2" MMG OCR RK
casing
4 TBD TBD TBD 4 1/2" X 1 1/2" MMG DV RK
3 TBD TBD TBD 41/2" X 1" KBG-2 DV BK
=::¡ 2 TBD TBD TBD 41/2" X 1" KBG-2 DV BK
1 TBD TBD TBD 41/2" X 1" KBG-2 DV BK
. I 11 Baker 9 5/8" X 7" HMC liner hngr,
- 7,350 ZXP Inr top pkr with TBS
---I.
TOp of Whip stock H 8,303
141/2",12.6#, 13Cr-80, VAMTOPtubing H 9,995
I EZSV Bridge plug H 7,520
1 Top of 7" Liner H 8,125 . I
----I.
9,920 H4 1/2" 'X' nipple, ID = 3.813" I
9,940 H 7" X 41/2" Baker S-3 packer
9,965 H4 1/2" 'X' nipple, ID = 3.813"
9,985 H4 1/2" 'XN' nipple, ID = 3.725"
9995 11 Baker 7" X 5" HMC liner hngr,
, ZXP 'nr top pkr with TBS
19-5/8" CIBPH 8,327
Top of 51/2" Liner H 9,648 t ~
/9 5~8", 47.0#, L-80, 11 9,892
casing
I 10145 /17'" 26.0~, L-80,
, BTC-M liner
141/2",12.6#, 13Cr-80, VAM TOP liner
/
H 10,779
l~n~r2'" 17.0#, L-BO, 11 10,555 1
DATE
10/23/89
07/08/96
03/06/02
09/24/02
07/13/03
09/20/03
REV BY COMMENTS
ORIGINAL COM PLETION
SRB INITIAL SDTRK COM PLETION
RNlTP CORRECTIONS
MHlKAK GLV C/O
CMOITLP KB ELEVATION CORRECTION
CMOITLP DATUM MD & ÆRF ANGLE
DATE
01/26/05
REV BY
dew
COMMENTS
Proposed Completion (Wp01)
PRUDHOE BA Y UNIT
WELL: F-34B
ÆRMIT No:
API No: 50-029-21980-02
SEe 2, T11N, R13E, 2133' SNL & 2412' EWL
BP Exploration (Alaska)
Plan: F¥34B wpO! {F~34!P!an F-34B}
Created By: Digital Businc$$ Client Us.
SURVEY PROGttAM
Ekpth Fm Depth To Survey/PJa¡¡ Tttol
7500.f.lO 10778.66 P1fUmed: F¥34B wpDt V1 MWD+IFR+MS
INFORMATION
REFERENCE
COMPANY DETAILS
BPArnoco
...
Date:
Date:
Basting Shape
DLeg TF ace vSec Target
F·34B T2
0.00
CASING DET AJLS
1VD MD Name· Size
8740.10 0144.70 7" 7.000
S!of
14ß"'46'OL{J74W 34
hing
w
Cheàed:
tude
6000 : + j FORMATION TOP DET AJLS
::\ :.
No. TVDPalh MDPath Formalion
;
u "\ T I 8745.10 10152.48 TSGR
...... .+ ....
i
- "ii ,
6500- -+-
- "\ : ,
- ì\ I
- , ,I;;;/' ,
- ;
~j~nd)i : ;"..
1m ~,~ , i I
:
'. "" .... SECTION DET AJLS
.. Azi TVD +NI-S +£/-\1
7000 See MD Ine
... 1\., , : i ~:g ~ ~;::~~ ,7 11: m:
..
- .. \ \ i 3 1: Hi~
!g¡/AJ , ... 11 5 i:8i5 :
1\ i', I I ~: ¿ ¡:~~ :
- " '\ , ~ ¡~~ ~: ;1 ¡:~~ ~: :
. 1\ f\ 1 1 , 4:
- , , i ~~ N\¡~ . I
-
No.
- :'\t1'\ Is! r : i
J"0, iii, .1 , I
\ ~"
Ii '\ +1 , T: J
- ... I r T 1
, ... , ! ' , " ! i i
8000 .¡ . \! i... ' I ' I
- ...... oct D!l:
- l ,
. i
;
\ / 3adC
- \
'U<;. I-'{, ~"
8500 . , . ,
- 'K ,..
- ..... / I:
I
- . ., ~
1
'Rl.C
-- : ...~
- . " : ~" ill
!' r t:;; .,
9000-' 1--
- ...- -~ ..~
.~
-
- , or
~
-
, , !-ï- , .i -
, , , , , , , , , , , , , , , , , , , , I ! f j , , , ,
Vertical Section at 25.24° [5ooft!in]
'NELL DETAILS
"
£'i
'"
'"
:ê:.
""
'ð.
ð
~
"
'e
"
>
~
SURVEY PROGRAM
Depth To Survey/Plan Tool Created By: Digital Business Client Us¡
75ûO.OO 10' Phmned: F~ 348 wpm V 14 MWD+!FR+MS Che<:J.::cd:
WELL DETAILS
Name +E/-W Northmg Ea~1.ing Latitude Longitude SloI
1!9,23 100165 5974666-88 651958.42 7(1"20'16,J25N 14S~46'(jI.014W 34
TARGET DETAILS
Narne TVD +N/-S +E/-W Northing Easting Shape
REFERENCE INFORMATION
('OMPA1\'Y DETAILS
BP Am~o
- y F·34B T2 8965. !O 4049.45 1964.19
''< '-348 " pO
- j / ¡ i I I I
. . CASING DETAILS
'w \ i ! : ¡ ; No. TVD MD Name Size
· / ,
~ 1 8740.10 10144.70 7" 7.000
!5~ j I I
I I
\ i i
· . .. .
j ,.J /'
/'¿
;
1 l j
- . I I
· i j I
. ]-3· TI . . j i
- : . : I I
- j . í I ·
- I .
· , · .
J' - . . .
· · ' l
- .. --- . . .
: . · .
; I ,
. I . .
- "-
. l
- 1 i j I ¡ .
/Of . .: ; I
OkV' ~,
- I ·
,
· . : .
~. I
· i /t . . . .
.
¡/: ) I . . . FORMA nON TOP DETAILS
. :
/1
- I No. TVDPath MDPath Formation
/80}(J : Ed JíJ I 8745.10 10152.48 TSOR
/ /
I / I I
· /~, / I
- . I
- 1 :l I
- / þU v
- /:1 v/ i
I I
k~W / . : : . .
/ ! ¡
· i~ 'u. SECTION DETAILS
- i IG'/ I
- --- See MD Inc Azi TVD +N/-S +EI-W DLeg TF ace vSec Target
- ~
- t --- 1 ~. ( i
'("" " i 2 J: :¡
- I 3 ~ i
- I I 4 11 .6i
, 5 8 F-34B TI
2000 , I I I , I I ¡ ¡ t 1 I I
F-34B T2
TI
6
7
8
9
2800
West(
2400
2000
1600
1200
"2
:â
'"
'"
:!.
+'
:E
t
o
~
:E
S
o
'"
.
.
Sperry-Sun
BP Planning Report
Company:
Field:
Site:
WeD:
WeDpath:
BPAmoco
Prudhoe Bay
PB F Pad
F-34
Plan F-34B
Date: 11712005 Time: 14:48:47
Co-ordinate(NE) Reference: Well: F-34, True North
Vertical (TVD) Reference: 28.5 + 36.6 65.1
Section (VS) Reference: Well (0.00N,0.ooE,25.24Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Plan: F-34B wp01
Date Composed:
Version:
Tied-to:
1/7/2005
14
From: Definitive Path
Principal: Yes
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927
Goo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2004
Site: PB F Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5972527.29 ft
650960.70 ft
Latitude: 70 19
Longitude: 148 46
North Reference:
Grid Convergence:
55.283 N
31.468 W
True
1.15 deg
Well: F-34 Slot Name: 34
F-34
Well Position: +N/-S 2119.23 ft Northing: 5974666.88 ft Latitude: 70 20 16.125 N
+E/-W 1040.65 ft Easting : 651958.42 ft Longitude: 148 46 1.074 W
Position Uncertainty: 0.00 ft
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
10144.70 8740.10 7.000 8.500 7"
Formations
MD Lithology
ft
10144.70 8740.10 TSGR
Dip Angle Dip Direction
deg deg
0.00 0.00
Targets
F-34B T1
-Plan hit target
F-34B T2
-Plan hit target
8737.10
8965.10
!\fap Map
+EI-W Nórthing Easting
ft ft ft ft
3680.51 1906.70 5978385.00 653790.00
4049.45 1964.19 5978755.00 653840.00
<-- Latitude -->
. Deg Min Sec
<- Longitude ....:>
Deg Min See
Description
Dip. Dir.
70 20 52.320 N 148 45 5.359 W
70 20 55.948 N 148 45 3.676 W
Plan Section Information
Incl Azim TVD +N/-S +EI-W DLS .BIIUdTur.n TFO
deg deg ft ft ft degl1 000.. degl1 000 <degl10Oft deg
7500.00 35.31 29.28 6752.97 2131.32 1128.93 0.00 0.00 0.00 0.00
7520.00 37.70 28.93 6769.04 2141.72 1134.72 12.00 11.96 -1.71 -5.00
7593.16 40.61 28.43 6825.77 2182.24 1156.88 4.00 3.98 -0.69 ~.41
9722.31 40.61 28.43 8442.18 3400.89 1816.70 0.00 0.00 0.00 0.00
10140.04 50.00 8.86 8737.10 3680.51 1906.70 4.00 2.25 -4.69 ~3.21
10160.04 50.00 8.86 8749.96 3695.65 1909.06 0.00 0.00 0.00 0.00
10355.76 61.74 8.86 8859.57 3855.45 1933.96 6.00 6.00 0.00 0.00
10578.66 61.74 8.86 8965.10 4049.45 1964.19 0.00 0.00 0.00 0.00
10778.66 61.74 8.86 9059.79 4223.52 1991.31 0.00 0.00 0.00 0.00
Target
F-34B T1
F-34B T2
. .
Sperry-Sun
BP Planning Report
Company: BP. Arnoco Date: 1/7/2005 Time: 14:48:47 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Refer~,!ce: Wetl: F-34, True North
Site: PB F Pad Vertical (fVD) Reference: 28,5 +36.6 65.1
Well: F-34 Section (VS) Reference: Well. (0;00N,O.00E,25.24Azi)
Wellpath: Plan F-34B Survey Calculation Method: Minimum Curvature Dh: Oracle
Survey
MD Incl .Azim TVD Sys TVD N/S EIW DLS MapN: Ml\pF: Tool/Comment
ft deg deg ft ft ft ft deg/100ft ft ft
7500.00 35.31 29.28 6752.97 6687.87 2131.32 1128.93 0.00 5976820.48 653043.84 MWD+IFR+MS
7520.00 37.70 28.93 6769.04 6703.94 2141.72 1134.72 12.00 5976830.99 653049.42 MWD+IFR+MS
7593.16 40.61 28.43 6825.77 6760.67 2182.24 1156.88 4.00 5976871.95 653070.75 MWD+IFR+MS
7600.00 40.61 28.43 6830.96 6765.86 2186.15 1159.00 0.00 5976875.91 653072.79 MWD+IFR+MS
7700.00 40.61 28.43 6906.88 6841.78 2243.39 1189.99 0.00 5976933.76 653102.61 MWD+IFR+MS
7800.00 40.61 28.43 6982.80 6917.70 2300.63 1220.98 0.00 5976991.60 653132.44 MWD+IFR+MS
7900.00 40.61 28.43 7058.72 6993.62 2357.86 1251.97 0.00 5977049.45 653162.26 MWD+IFR+MS
8000.00 40.61 28.43 7134.63 7069.53 2415.10 1282.96 0.00 5977107.30 653192.08 MWD+IFR+MS
8100.00 40.61 28.43 7210.55 7145.45 2472.34 1313.95 0.00 5977165.15 653221.90 MWD+IFR+MS
8200.00 40.61 28.43 7286.47 7221.37 2529.57 1344.94 0.00 5977223.00 653251.72 MWD+IFR+MS
8300.00 40.61 28.43 7362.39 7297.29 2586.81 1375.93 0.00 5977280.85 653281.54 MWD+IFR+MS
8400.00 40.61 28.43 7438.31 7373.21 2644.05 1406.92 0.00 5977338.70 653311.36 MWD+IFR+MS
8500.00 40.61 28.43 7514.23 7449.13 2701.28 1437.91 0.00 5977396.54 653341.18 MWD+IFR+MS
8600.00 40.61 28.43 7590.15 7525.05 2758.52 1468.90 0.00 5977454.39 653371.01 MWD+IFR+MS
8700.00 40.61 28.43 7666.06 7600.96 2815.76 1499.89 0.00 5977512.24 653400.83 MWD+IFR+MS
8800.00 40.61 28.43 7741.98 7676.88 2872.99 1530.88 0.00 5977570.09 653430.65 MWD+IFR+MS
8900.00 40.61 28.43 7817.90 7752.80 2930.23 1561.87 0.00 5977627.94 653460.47 MWD+IFR+MS
9000.00 40.61 28.43 7893.82 7828.72 2987.46 1592.86 0.00 5977685.79 653490.29 MWD+IFR+MS
9100.00 40.61 28.43 7969.74 7904.64 3044.70 1623.85 0.00 5977743.64 653520.11 MWD+IFR+MS
9200.00 40.61 28.43 8045.66 7980.56 3101.94 1654.84 0.00 5977801.48 653549.93 MWD+IFR+MS
9300.00 40.61 28.43 8121.57 8056.47 3159.17 1685.83 0.00 5977859.33 653579.75 MWD+IFR+MS
9400.00 40.61 28.43 8197.49 8132.39 3216.41 1716.81 0.00 5977917.18 653609.57 MWD+IFR+MS
9500.00 40.61 28.43 8273.41 8208.31 3273.65 1747.80 0.00 5977975.03 653639.40 MWD+IFR+MS
9600.00 40.61 28.43 8349.33 8284.23 3330.88 1778.79 0.00 5978032.88 653669.22 MWD+IFR+MS
9700.00 40.61 28.43 8425.25 8360.15 3388.12 1809.78 0.00 5978090.73 653699.04 MWD+IFR+MS
9722.31 40.61 28.43 8442.18 8377.08 3400.89 1816.70 0.00 5978103.63 653705.69 MWD+IFR+MS
9800.00 42.08 24.29 8500.52 8435.42 3446.86 1839.45 4.00 5978150.06 653727.51 MWD+IFR+MS
9900.00 44.19 19.31 8573.51 8508.41 3510.32 1864.77 4.00 5978214.01 653751.54 MWD+IFR+MS
10000.00 46.49 14.72 8643.81 8578.71 3578.32 1885.52 4.00 5978282.40 653770.90 MWD+IFR+MS
10100.00 48.97 10.47 8711.09 8645.99 3650.51 1901.59 4.00 5978354.90 653785.50 MWD+IFR+MS
10140.04 50.00 8.86 8737.10 8672.00 3680.51 1906.70 4.00 5978385.00 653790.00 F-34B T1
10144.70 50.00 8.86 8740.10 8675.00 3684.05 1907.25 0.00 5978388.54 653790.48 7"
10160.04 50.00 8.86 8749.96 8684.86 3695.65 1909.06 0.00 5978400.18 653792.05 MWD+IFR+MS
10200.00 52.40 8.86 8775.00 8709.90 3726.42 1913.85 6.00 5978431.04 653796.22 MWD+IFR+MS
10300.00 58.40 8.86 8831.76 8766.66 3807.71 1926.52 6.00 5978512.57 653807.24 MWD+IFR+MS
10355.76 61.74 8.86 8859.57 8794.47 3855.45 1933.96 6.00 5978560.44 653813.71 MWD+IFR+MS
10400.00 61.74 8.86 8880.52 8815.42 3893.96 1939.96 0.00 5978599.06 653818.93 MWD+IFR+MS
10500.00 61.74 8.86 8927.86 8862.76 3980.99 1953.52 0.00 5978686.34 653830.72 MWD+IFR+MS
10578.66 61.74 8.86 8965.10 8900.00 4049.45 1964.19 0.00 5978755.00 653840.00 F-34B T2
10600.00 61.74 8.86 8975.20 8910.10 4068.02 1967.08 0.00 5978773.63 653842.52 MWD+IFR+MS
10700.00 61.74 8.86 9022.55 8957.45 4155.06 1980.65 0.00 5978860.91 653854.31 MWD+IFR+MS
10778.66 61.74 8.86 9059.79 8994.69 4223.52 1991.31 0.00 5978929.57 653863.59 MWD+IFR+MS
,e-
TERRIE L HUBBLE
BP EXPLORATION AK .INC
PO BOX 196612 . MB 7-5
ANCHORAGE,AK 99519-6612
89-6/1252 189
e
"Mastercard Check"
DATE()3):¿g/OS
~~i,oo'l")t1lì~V7f~/Ao6C<:'- ,$ ro.lO
F~;d"~~~Wo-/1 ~ UULLAHS
::::"gF:A~4~' -{QJInlR~~ .t0Æ&
I: ~ 2S 2000 1;01: ~ ~ ~ .....·b 2 2 711.·~ S S bU- 0 ~ß ~
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ¡;¿?l r 3 c¡ IJ
PTD# ~Ç-053
)<'
Development
Service
CHECK WHAT
APPLlÉs
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If APJ Dumber
last two. (2) digits
are between 60-69)
Pn.,OT
(PH)
Exploration
Stratigraphic
"CLUE"·
Tbe permit is for a new we1lbore segmeDt of
existing weD'. .
Permit No, .' API No. .
ProductioD. sbould cODtinue to be reported as
a function· of tbe origiDal API Dumber. stated
a})ove. .
HOLE )n accordance witb' 20 AAC 25.005(1), aU
records, data and logs acquired. .for tbe pilot
bole must be clearly differentiated "in botb
name (name OD permit plus PH)
and API Dumber (SO
70/80) from records, data and IOIS acquired
for well (Dame OD permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Tbe permit is approved subject ·to fun
compliance with 20 AAC 25~OSS~ Approval to
periorate aDd produce is cODtingeDt UPOD
issuance of ~ cODsenatioD order approving a
spacing' exceptioD. _
(ComoanY Name) assumes the liabiUty of aD)'
protest to tbe spacing .~xception that may
oecur.
All dry ditcb sample sets submiued to tbe
CommissioD must be in DO greater 1baD 30'
sample iDterva)s from below tbe permafrost
or from wbere samples are tint caught aDd
10' sampleiriter:vals through target J.oøes.
D
D
Well bore seg
Annular Disposal
On
Program DEV
~ On/Off Shore
11650
Unit
Well Name: PRUDHOE BAY UNIT F-34B
1-01L GeoArea 890
OEV
)
,4~. ~
PRUDHOE BAY,tJlA~( OIL - 64~ /:SV
bounda!)'
Field & Pool
Company BP EXPLORATION (ALASKA)
P.ß(mit f~e attache~.
.Leas.ß.number .appropri<lte. . . . .
.U.nique weltn.arn.ß.and lJumb.er . .
Wellloc<lt.ßd in.a. d.efine!ipool. . .
"/o"loc<lted proper distance from driJling unit
loc<lt.ßd pr.oper .distance. from other welJs
cientacreaQ.e.aYail<lbl~ [n.dJillilJQ. unjt
viated, js wellbore platinc)u.ded
NC
V!~II
Well
2
3
4
5
6
7
8
9
PTO#: 2050530
Administration
.
(For
in.c.omm.ents).
in Jorce
can Þe issued without conserva.tion order
can Þe issued without administ(atÎlleapproval
Can permit be approved before 15-day wait
Well Joc<lt.ßd within ar~a and.strata .authoriz~d by Inj~ctiolJ Ord.ß( # (pulIO#
.A)I welJs.withLn1l4.mite.area.of (eyiew jd.elJlified (FO( seNjc:ew.e[l only). . .
duration of pre-pro~uction l.ßss th,m:3 months. (For service wel
Operator only affected party
.Ope(ator has.appropriate. b.ond
p.ß(mil
p.ß(mil
o
11
12
13
14
15
6
7
Date
3/30/2005
Appr
RPC
on)y)
PJe-produc~d injector
.-
f\labol"S.2.E$,
3/24/2005.
Sidetrack.
MaxMW,1J
-
A.ppg
Test to 3500 psLMSp 2270 psi
f\loLan H2S pad.
NA
NA
NA
NA
Y.ßs
Y.ßs
Y.ßs
Yes
.Y.ßs
NA.
Yes
Yes
.Yes
Y.ßs
Y.ßs
.No.
.NA
Con.sLslency.h.as Þee.nissued forJhis proiect
C.ooduçlor st(Îngprovided . . . . . . .
S.urfacecasing.pJotects all known USDWs .
.CMT vol adequate to circutateon.cond.uctor
AÇMP Finding of
18
19
20
21
Engineering
& SUJf.C$g
.CMTvoladequateto tie-LnJongstriog to.surf csg.
.CMT will coyer.a)l known -Pfo.ductiye horizon.s
.C.asiog de.signs adequa.te fo( C,T~ B.&.permafr.ost
.A~~quale.tan)<.age.oJ re.serve pit
Jfa r~-~(ill~ bas.a 1.0:403 for abandonment be.ßO apPJoved
A~equale ."'1e[lbore. sep¡¡¡r<ltio.n -Pfopose~. . _
Jfdivecter Jeqj.lired, does iLmeet regulations
DJillilJg fluid. program schematic & eq.uip Jist
adequ<lt.ß
22
23
24
25
26
27
Date 28
3/31/2005 29
30
Appr
WGA
lo.(pu.t psig
Chokemanjfold complies. w/APIRP-5:3 (May 84)
Work will occ,u( without.operatjonsbutdown
Is presence. of H2S gas probable.
MeçhanicaLcond.ition of wells within J\OR Yerifi~d (For.s.ervice well onJy)
in .comments)
.BOPEs, do they meel regulation
.BOPEpre.ss ratiog app(op(Îate; .test
31
32
33
34
No
NA
NA
NA
NA
p.ß(mil can Þe issued wlo hydrogen sulfide meas.u(es
OatapJeselJted on. pote.ntial oveJpressure .zones
35
36
37
38
39
Geology
Appr
RPC
.S.ßLsmic.analys.is of shallow gaszolJes
(if off-sh.ore)
narnelphonefor.weelsly progressreporls [e¡cplor¡¡to!)' .only).
nitial ClasslType
Yes
Yes
Y.ßs
Yes
Yes
Y.ßs
Yes
Yes
Yes
Y.ßs
Y.ßs
Yes
Yes
NA
.NA
NA
NA
.S.ßabed .conditiolJ survey
Conta.ct
Date
3/30/2005
Date
~~S-
Date
Engineering
Commissioner:
Cf13{;I(05'
Date:
J171{J
Geologic
"V!5""
.
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
.
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Jul 12 07:53:45 2005
.1 Cd- - ù r J
# IJ ¡JJ-
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/07/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.... .......... ..UNKNOWN
Continuation Number.... ..01
Previous Reel Name..... ..UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name..;...... ....LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/07/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.......... ......UNKNOWN
Continuation Number.. ....01
Previous Tape Name. . . . . . .UNKNOWN
Comments......... ..... ...STS LIS writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
F-34B
500292198002
BP Alaska Exploration
Sperry Drilling Services
12-JUL-05
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0003649138
A. SHANAHAN
J. RALL
MWD RUN 3
MW0003649138
N. WHITE
J. RALL
MWD RUN 4
MW0003649138
N. WHITE
J. RALL
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2
11N
13E
2133
2412
64.38
35.88
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
8.500
6.125
CASING
SIZE (IN)
9.625
7.000
DRILLERS
DEPTH (FT)
7483.0
10142.0
#
.
.
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED
DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF
WHICH WAS AT 7483'MD
IN THE ORIGINAL F-34 WELLBORE.
4. MWD RUN 1 WAS DIRECTIONAL ONLY TO POSITION THE
WHIPSTOCK AND MILL THE
WINDOW. NO DATA ARE PRESENTED.
5. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL, DUAL GAMMA
RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS, AND PRESSURE WHILE
DRILLING (PWD). MAD
PASS SGRC DATA WERE ACQUIRED FOR TIE-IN PURPOSES
WHILE RIH FOR MWD RUN 2.
THESE MAD PASS DATA WERE MERGED WITH THE RUN 2 MWD
DATA. NO SEPARATE MAD
PRESENTATION IS INCLUDED.
6. MWD RUN 4 COMPRISED DIRECTIONAL, DGR, AND
ELECTROMAGNETIC WAVE RESISTIVITY
PHASE-4 (EWR4).
7.MWD DATA ARE CONSIDERED PDC PER E-MAIL FROM
D.SCHNORR, GEOQUEST(BP), DATED
7/7/2005, QUOTING AUTHORIZATION FROM ROGER SELS (BP
GEOSCIENTIST) .
8. MWD RUNS 1 - 4 REPRESENT WELL F-34B WITH API#:
50-029-21980-02. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 10850'MD/9082'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURAL GAMMA RAY.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .05/07/12
Maximum Physical Record. .65535
File Type.......... ......LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
1
and clipped curves; all bit runs merged.
.5000
.
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
START DEPTH
7266.0
7511.0
10115.0
10115.0
10115.0
10115.0
10115.0
STOP DEPTH
10807.0
10850.0
10813.5
10813.5
10813.5
10813.5
10813.5
.
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
2
3
4
#
REMARKS:
MERGED MAIN PASS.
$
MERGE TOP
7266.0
8670.5
10142.0
MERGE BASE
8670.5
10142.0
10850.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units....... ... .Feet
Data Reference Point. ....... ......Undefined
Frame Spacing................ .....60 .1IN
Max frames per record....... ......Undefined
Absent value. ........ ...... .......-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
Min
7266
3.18
13.56
0.69
0.62
0.65
0.33
0.38
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Max
10850
637.27
556.16
1918.99
1541. 22
2000
2000
53.26
Mean
9058
93.1952
105.411
44.6522
37.7402
69.2553
90.6927
3.14798
First Reading For Entire File...... ....7266
Last Reading For Entire File....... ....10850
Nsam
7169
6679
6935
1398
1398
1398
1398
1398
First
Reading
7266
7511
7266
10115
10115
10115
10115
10115
Last
Reading
10850
10850
10807
10813.5
10813.5
10813.5
10813.5
10813.5
.
File Trailer
Service name...... .......STSLIB.OOl
Service Sub Level Name...
Version Number.... .......1.0.0
Date of Generation.. .....05/07/12
Maximum Physical Record. .65535
File Type............ ... .LO
Next File Name....... ... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .05/07/12
Maximum Physical Record. .65535
File Type.. ............. .LO
Previous File Name..... ..STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
.
header data for each bit run in separate files.
2
.5000
START DEPTH
7266.0
7511.0
STOP DEPTH
8634.0
8670.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
18-APR-05
Insite
66.37
Memory
8670.0
7511.0
8670.0
35.3
41.2
TOOL NUMBER
132482
10505932
8.500
7483.0
LSND
10.50
81. 0
9.5
2700
4.5
.
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
.000
.000
.
.0
125.6
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type....... ........ ...0
Data Specification Block Type... ..0
Logging Direction. ..... ...........Down
Optical log depth units. ..........Feet
Data Reference Point........ ......Undefined
Frame Spacing....... ......... .....60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
Rap
GR
MWD020
MWD020
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7266 8670.5 7968.25 2810 7266 8670.5
Rap MWD020 FT/H 3.18 334.34 126.536 2320 7511 8670.5
GR MWD020 API 38.9 281.97 115.147 2589 7266 8634
First Reading For Entire File......... .7266
Last Reading For Entire File.......... .8670.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .05/07/12
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number...... .....1.0.0
Date of Generation. ......05/07/12
Maximum Physical Record..65535
File Type... ... ........ ..LO
Previous File Name..... ..STSLIB.002
.
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
.
header data for each bit run in separate files.
3
.5000
START DEPTH
8634.5
8671.0
STOP DEPTH
10090.0
10142.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction...... ......... ..Down
Optical log depth units......... ..Feet
Data Reference Point............. .Undefined
21-APR-05
Insite
66.37
Memory
10142.0
8670.0
10142.0
38.7
49.0
TOOL NUMBER
132482
10505932
8.500
7483.0
LSND
10.50
61. 0
9.5
1600
3.4
.000
.000
.000
.000
.0
147.2
.0
.0
.
.
Frame Spacing..................... 60 .1IN
Max frames per record....... ......Undefined
Absent value. ................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD030
GR MWD030
Units
FT
FT/H
API
Size
4
4
4
Nsam Rep
1 68
1 68
1 68
Code
Offset
o
4
8
Channel
1
2
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8634.5 10142 9388.25 3016 8634.5 10142
Rap MWD030 FT/H 4.71 637.27 83.9165 2943 8671 10142
GR MWD030 API 22.92 203.92 116.768 2912 8634.5 10090
First Reading For Entire File..... .....8634.5
Last Reading For Entire File...... .....10142
File Trailer
Service name. ........... .STSLIB.003
Service Sub Level Name. . .
Version Number.. ....... ..1.0.0
Date of Generation.... ...05/07/12
Maximum Physical Record..65535
File Type........... .... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name.... ...... ...STSLIB.004
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation...... .05/07/12
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
10090.5
10115.0
10115.0
10115.0
10115.0
10115.0
10142.5
STOP DEPTH
10807.0
10813.5
10813.5
10813.5
10813.5
10813.5
10850.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
24-APR-05
.
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units..... ......Feet
Data Reference Point...... ........Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. .......... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Insite
66.37
Memory
10850.0
10142.0
10850.0
.
51. 0
65.0
TOOL NUMBER
151107
148579
6.125
10142.0
Flo Pro
8.40
44.0
10.0
3800
6.0
1.600
.890
1. 250
1. 750
69.0
129.2
69.0
69.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
. .
.
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10090.5 10850 10470.3 1520 10090.5 10850
ROP MWD040 FT/H 3.2 331.96 57.8529 1416 10142.5 10850
GR MWD040 API 13.56 556.16 64.7728 1434 10090.5 10807
RPX MWD040 OHMM 0.69 1918.99 44.6522 1398 10115 10813.5
RPS MWD040 OHMM 0.62 1541. 22 37.7402 1398 10115 10813.5
RPM MWD040 OHMM 0.65 2000 69.2553 1398 10115 10813.5
RPD MWD040 OHMM 0.33 2000 90.6927 1398 10115 10813.5
FET MWD040 HOUR 0.38 53.26 3.14798 1398 10115 10813.5
First Reading For Entire File..... .... .10090.5
Last Reading For Entire File...... .... .10850
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation... ... .05/07/12
Maximum Physical Record. .65535
File Type........... .... .LO
Next File Name...... .... .STSLIB.005
Physical EOF
Tape Trailer
Service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/07/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number.. ... .01
Next Tape Name..... ..... . UNKNOWN
Comments........... ..... .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name..... ...... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .05/07/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name......... ... ....UNKNOWN
Continuation Number.... ..01
Next Reel Name.... .......UNKNOWN
Comments........ ....... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File