Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
205-066
· . Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ () S - 0 jp fp Well History File Identifier Organizing (done) o Two-sided 1111111111111I" III o Rescan Needed 111111111111111111I RESCAN DIGITAL DATA OVERSIZED (Scannable) J' Color Items: ~iskettes, No. ~ o Maps: o Greyscale Items: o Other, No/Type: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Date 7 J/D /07 o Other:: ~p BY: ~ 151 111111111111111111I Project Proofing BY: ~ 151 mf Scanning Preparation +"3 = TOTAL PAGES {¡; 3 P (Count does not include cover sheet) BY: Date: 151 11/1111111111/1111I Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES BY: ~ Date:7/lùJ07 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO 151 YVl f NO BY: Maria Date: 151 11111111111I1111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: 151 Comments about this file: Quality Checked 11111111111I111111I 10/6/2005 Well History File Cover Page.doc À lø J \to ",-4- DATA SUBMITTAL COMPLIANCE REPORT 5/31/2007 Permit to Drill 2050660 Well Name/No. MILNE PT UNIT SB E-32L 1 Operator BP EXPLORATION (ALASKA) INC API N:,P5~9-13;6t:2-~~ - MD 8922 ,/ TVD 4437". Completion Date 5/26/2005 ---. Completion Status 1-01L Current Status 1-01L UIC N ~'- REQUIRED INFORMATION -_.._._~_._- DirectionalSurvey ~.__ Mud Log No Samples No ---_._~-----_.- DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, IFR/CASANDRA, GYRO Well Log Information: (data taken from Logs Portion of Master Well Data Maint Name Directional Survey Log Log Scale Media Run No Interval OH/ Start Stop CH 5296 8922 Open 5296 8922 Open 77 8864 Open 77 8864 Open 122 8922 Open - Log/ Data Type Electr Digital Dataset Med/Frmt Number D Asc Received 7/29/2005 Comments IIFR -_._~- I I J D Asc D Lis Directional Survey 13214 Induction/Resistivity 13214 LIS Verification 13535 Induction/Resistivity 7/29/2005 7/7/2005 7/7/2005 2/22/2006 ROP DGR EWR CTNP SLD plus Graphics MWD L C Lis Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Chips Received? ~ Formation Tops @N GIN - Daily History Received? Analysis Received? ~ ~--_._-~~" --~~-" ---"" --~-_.-..~. Comments: =~ ~. -~-~- Å-~7 Compliance Reviewed By: Date: . . C/ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 IJ5~5 RE: MWD Formation Evaluation Logs MPE-32 Ll, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPE-32 LI: LAS Data & Digital Log Images: 50-029-23261-60 J'O 5 - é1PLP 1 CD Rom Q¡(~ 2-lo'9{00 . . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Helen Warman 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 June 27, 2005 RE: MWD Formation Evaluation Logs MPE·32 L1, AK-MW-3696012 1 LIS formatted Disc with verification listing. API#: 50-029-23261-60 tLß)(<-f / PLEASE ACKNOWLEDGE RECEIYf BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro·technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 ~~~ Signed: /Jj~ ú~J ( )65-\0~~ F:t~ , ."'- a STATE OF ALASKA .. ALASKA'" AND GAS CONSERVATION COM~ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG r, '"\ >-:, " 1 L' RAJasbn ~J~Øì1 ?IðS: Stârt ProduCtion . .~ : '!,,< . 1a. Well Status: 18 Oil DGas D Plugged D Abandoned D Suspended DWAG 1b, Well Class: 20AAC 25.105 20AAC 25.110 18 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic D Service 2, Operator Name: 5. Date Comp., Susp" or Aband. 12, Permit to Drill Number BP Exploration (Alaska) Inc. 5/26/2005 205-066 3. Address: 6. Date Spudded 13, API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 5/19/2005 50- 029-23261-60-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 5/22/2005 MPE-32L 1 3984' FSL, 2032' FEL, SEC, 25, T13N, R10E, UM 8. KB Elevation (ft): 15, Field / Pool(s): Top of Productive Horizon: 3876' FSL, 1666' FEL, SEC. 30, T13N, R11E, UM (OA) 56,04 Milne Point Unit / Schrader Bluff Total Depth: 9. Plug Back Depth (MD+ TVD) 3880' FSL, 1618' FEL, SEC, 30, T13N, R11E, UM (OA) 8922 + 4343 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 569110 y- 6016521 Zone- ASP4 8922 + 4343 Ft ADL 02/231 _.__.~ _._~----_. 11. Depth where SSSV set 17. Land Use Permit: TPI: x- 574718 y- 6016468 Zone- ASP4 Total Depth: x- --"'-~ --- N/A MD 574766 y- 6016471 Zone- ASP4 19, Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 18No N/A MSL 1800' (Approx,) 21. Logs Run: MWD , GR , RES, IFRlCASANDRA , GYRO 22. CASING, LINER AND CEMENTING RECORD CASING SElTING DEPTHMD SETTING'DEPTHTvp HOLE .... ~9q~T SIZE WT.PERFT, GRADE TOP 60TTOM TOp 60TTOM SIZE PUllED 20" 92# H-40 35' 113' 35' 113' 42" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 35' 2746' 35' 2661' 13-1/2" 345 sx AS Lite, 371 sx Class 'G' 7-5/8" 29,7# L-80 33' 5310' 33' 4449' 9-7/8" 725 sx Class 'G' 4-1/2" 12,6# L-80 5246' 8894' 4438' 4347' 6-3/4" Uncemented Slotted Liner 23, Perforations open to Production (MD + TVD of T o,e and 24, T JBING . .' Bottom Interval, Size and Number; if none, state' none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 2-7/8",6.5#, L-80 5064' None MD TVD MD TVD 5332' - 8851' 4453' - 4353' 25. ACID,"" c"" ,,,,,:,,,d ETC. ...'.... DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 80 Bbls of Crude 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc,): July 14, 2005 Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF W A TER-BBl CHOKE SIZE I GAS-Oil RATIO 8/7/2005 12 TEST PERIOD .. 834 224.5 0 269 Flow Tubing Casing Pressure CALCULATED .. Oil -BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR) Press. 28E 0 24-HoUR RATE 1668 449 0 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFL AIJG 2 .~ lD05 <;;, ,<.. ,". ,.'~'.' ¡:.'.'::; Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE 28. GEOLOGIC MARKERS 29. ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". MA MB1 MB2 MC NA NB NC ND NE NF OA OA 4360' 4371' 4472' 4769' 4824' 4890' 4950' 5006' 5031' 5168' 5310' 8878' 4069' 4077' 4141' 4283' 4304' 4328' 4350' 4370' 4379' 4423' 4449' 4349' None 30. List of Attachments: 31, I hereby certify that the foregoing is true and correct to the best of my knowledge, Signed Title Technical Assistant Date MPE-32L 1 Well Number Prepared By Name/Number: Drilling Engineer: Sandra Stewman, 564-4750 Walter Quay, 564-4178 205-066 Permit No, I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other, Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments, ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00), ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain), ITEM 27: If no cores taken, indicate "None", ITEM 29: List all test information, If none, state "None", Form 10-407 Revised 12/2003 Submit Original Only . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPE-32 L 1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 5,296.48' MD 5,310.00' MD 8,922.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. :::or;~e~:; Signed íU. ÐÞ~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) 11-Jul-05 ~oç- O~~ ~/~. . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPE-32L 1 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 5,296.48' MD 5,310.00' MD 8,922.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date ~ l ~~r ¡Ill i1 Ji J Signed ~'r ~ Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) 11-Jul-05 ~ l))--a ~ (; F!{-L _ STATE OF ALASKA . ALASKA ðll'AND GAS CONSERVATION COMMI" N WELL COMPLETION OR RECOMPLETION REPORT AND LOG .. 1a, Well Status: II Oil o Gas o Plugged o Abandoned o Suspended o WAG 1b. WeIIC ss: ,. . 20AAC 25.105 20AAC 25.110 II Development o Exploratory OGINJ OWINJ o WDSPL No. of Completions One Other o Stratigfaphic o Service 2, Operator Name: 5. Date Comp" Susp" or Aband, 12. Permitto Drill Number BP Exploration (Alaska) Inc. 5/26/2005 205-066 3, Address: 6. Date Spudded 13, API Number P,O, Box 196612, Anchorage, Alaska 99519-6612 5/19/2005 - 50- 029-23261-60-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 5/22/2005 , M PE-32L 1 3984' FSL, 2032' FEL, SEC. 25, T13N, R10E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 3876' FSL, 1666' FEL, SEC. 30, T13N, R11E, UM (OA) 56,04 Milne Point Unit I Schrader Bluff Total Depth: 9, Plug Back Depth (MD+ TVD) 3880' FSL, 1618' FEL, SEC. 30, T13N, R11E, UM (OA) 8922 .. + 4343 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) i./'i?>7' 16. Property Designation: Surface: x- 569110' y- 6016521 ... Zone- ASP4 8922· + ~£b Ft ADL 02/231 TPI: x- 574718 y- 6016468 Zone- ASP4 11, Depth where SSSV set >¡." 0,> 17. Land Use Permit: Total Depth: x- 574766 y- 6016471 Zone- ASP4 N/A MD 18. Directional Survey 19, Water depth, if offshore 20. Thickness of Permafrost II Yes ONo NIA MSL 1800' (Approx.) 21, Logs Run: -r / I"'> 1.M..6,..f",.> .,) 531ö; /Ylp tiv..¡ã 71':V MWD , GR , RES, IFRlCASANDRA , GYRO db 7 (, ,¿.~- 22. CASING, LINER AND CEMENTING RECORD ··.f~~i~G ..... :SETTING DEPTH\MD . SETTING! EPTHTVO HÖCe .> AMOUNr \/liT. PER FT. GRADE TOP BOTTOM Top ¡BOTTOM SIZE PUllED 20" 92# H-40 35' 113' 35' 113' 42" 260 sx Arctic Set lADDrox} 10-3/4" 45,5# L-80 35' 2746' 35' 2661' 13-1/2" 345 sx AS Lite, 371 sx Class 'G' 7-5/8" 29.7# L-80 33' 5310' 33' 4449' 9-7/8" 725 sx Class 'G' 4-1/2" 12.6# L-80 5246' 8894' 4438' 4347' 6-3/4" Uncemented Slotted Liner 23. Perforations 0Ren to Production (MD + TVD of TOE and 24. TUBING RECO~D Bottom Interval, Size and Number; if none, state' none"): SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 2-7/8", 6.5#, L-80 5064' None MD TVD MD TVD 5332' - 8851' 4453' - 4353' 25. Ab/Ô,. I ,;........;¡;.;ETbJ· . DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 80 Bbls of Crude 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc,): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR Oil-Bel GAs-McF WATER-Bel CHOKE SIZE 1 GAS-Oil RATIO TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED .. Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFl JUL 072005 "......-;.,.'"~_..::~-;,;.~~.- r (,Üh\PLL f ,t)i1 '~ ì DArE rt , r. ,.,¿.D , 6J \, :2- . ..¿------ ':' .,;';,!.;¿ '\ Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE -::'75:1.). . ( 28. . GEOLOGIC MARKERS 29. NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". MA MB1 MB2 MC NA NB NC ND NE 4360' 4371' 4472' 4769' 4824' 4890' 4950' 5006' 5031' 5168' 5310' 8878' 4069' 4077' 4141' 4283' 4304' 4328' 4350' 4370' 4379' 4423' 4449' 4349' None ~A o 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, Well Service Report and a Leak-Off Test Summary, 31. I hereby certify that the foregoing is true and correct to the best of my knowledge, Signed Title Technical Assistant Date MPE-32L 1 Well Number Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Walter Quay, 564-4178 205-066 Permit No, / A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00), ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval), ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain), ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None", Form 10-407 Revised 12/2003 Submit Original Only .II:ä; 2-9/16" - SM FMC Wellhead: 11" x 7-1116" SM. Gen SA, W 2-7/8" FMC Tbg. ,3" LH Acme on top and 2-7/8" EU 8rd on bottom, 2.S" CIW BPV Profile 20" x 34" insulated, 215 #/lt A-53 [JJ]J 103/4" 45.5 ppf L-80 STC-M (Drift ID = 9.794, cap. = .0961 bpf) 10 3/4" HOWCO Float Shoe I 2744' I 7 5/8" 29.7 ppl, L-80, STRC-mod casing (Drift ID = 6,750", cap = 0.0459 bpI) 2-7/8" 6.5 ppf, L-80 8rd eue tbg. ( drift id = 2.347" cap = .00592 bpI) KOP @ 450' +60 degree from 750' Tbg max angle = 69 degree @ 4750' Window in 7 5/8" Casing @ 5310' - 5322' Well Angle @ window = 79° Baker Hook Wall Hanger inside 7-5/8" Window 16.70' Baker Hook Wall Hanger outside 7-5/8" Window 6.15' Baker Tie Back Sleeve 5259' Baker ZXP Liner Top Packer 5269' Baker LEM top 5295' Baker Non-locating Seal Assembly 5459' 75/8" x 10' Pup Joint 5332' - 5342' Baker Tie Back Sleeve 5425' Baker ZXP Liner Top Packer 5436' Baker 7-5/8" x 5" HMC Liner Hanger 5443' Baker 190-47 Seal Bore Extension 5449' 7-5/8" Weatherford Float Collar 6214' 7-5/8" Weatherford Float Shoe 6299' MPE-32 L 1 OA Lateral DATE S/2S/OS REV. BY L. Hulme COMMENTS Drilled & Completed by Doyon 14 Orig. KB elev. = 57.70' (Doyon 14) Orig. .S. elev.= 30.30' (Doyon 14) HES TMPD 2-7/8" x 1~ Gas Lift Mandrel 148' HES TMPD 2-7/8" x 1" Gas Lift Mandrel 2018' HES TMPD 2-7/8" x 1" 4819' Gas Lift Mandrel HES XN-Nipple (2.250" id) 4971' Discharge Head 4993' Tandem ESP Pump GMPTAR 1:1 4993' 122GC2200 & 19GC8200 Gas Separator 5021' I Model - GRSFTXAR H6 Tandem Seal Section 5025' I Model - GSB3 DB UT/L TAB HSN PFSNPSA Motor, 228 KMH I 5039' I 2305 volt I 60 amp PumpMate wi 6 fin Centralizer I 5059' I PumpMate Depth = 3260' TVD 85 jts. - 41/2" 12.6# L-80, 1ST Slotted Liner (5331' - 8851 ') 61/8" Hole td @ 8922' HES 41/2" "V" Float Shoe 8894' 6 1/8" Hole td @ 8894' HES 4 1/2" "V" Float Shoe 8894 37 jts. - 4", 9.5# L-80, 1ST 37 jts Baker Excluder Screens (6203' - 8849') MILNE POINT UNIT WELL MRE-32 L1 API NO: 50-029-23261-00 API NO: 50-029-23261-60 BP EXPLORATION (AK) BP AMERICA Operations Summary Report Page 1 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 5/7/2005 5/8/2005 5/9/2005 MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 5/7/2005 End: From - To Hours Task Code NPT Phase Description of Operations 00:00 - 01 :30 1,50 MOB P PRE PJSM, Skid rig floor 01 :30 - 03:30 2.00 MOB P PRE PJSM, Move rig to MPE-32, spot over well 03:30 - 04:00 0,50 MOB P PRE PJSM, skid rig floor. spot rockwasher 04:00 - 05:00 1.00 MOB P PRE PJSM, Berm rockwasher, spot water tank, hook up lines to floor, Rig accepted @ 05:00 5/7/2005 05:00 - 08:30 3.50 RIGU P PRE PJSM, Nipple up Diverter and lines, Derrick inspection, load pipe shed 08:30 - 09:30 1,00 RIGU P PRE PJSM, prep rig floor, move pipe in derrick, fill pits with spud mud 09:30 - 10:00 0.50 RIGU P PRE PJSM, Pick up HWT pipe and jars stand in derrick 10:00 - 12:30 2.50 RIGU P PRE PJSM, Picking up BHA 12:30 - 13:30 1.00 RIGU P PRE PJSM, Pre-spud meeting with crews, Diverter test, the right to witness test was waver by John Crisp AOOGC 13:30 - 14:00 0.50 DRILL P SURF PJSM, fill hole with mud check for leaks, wash out to 115' 14:00 - 14:30 0.50 DRILL P SURF PJSM, Drilling 115' to 179' 14:30 - 15:00 0.50 DRILL P SURF PJSM, POH, rig up wire line Gyro unit 15:00 - 15:30 0.50 DRILL P SURF PJSM, Pickup BHA 15:30 - 00:00 8.50 DRILL P SURF Drilling 179' to 1011' with 500 gpm, 1400 psi, 65 rpms, run Gyros to 450', AST 1.79, ART 4.07, TQ 4K 00:00 - 07:00 7.00 DRILL P SURF Drilling 1011' to 1776" with 540 gpm, 2000 psi, 65 rpms, rerun Gyro @ 1200' 07:00 - 08:30 1.50 DRILL P SURF Circ. three bottoms up, with 535 gpm 2100 psi 80 rpms 08:30 - 09:00 0.50 DRILL P SURF PJSM, Pump out of hole to Hwdp 09:00 - 09:30 0.50 DRILL P SURF PJSM, Rih, wash last stand to bottom 09:30 - 11 :00 1.50 DRILL P SURF PJSM, Circ and raise mud wt to 9.8 with spike mud 11 :00 - 18:30 7.50 DRILL P SURF Drilling 1776' to 2756 with 550 gpm, 2500 psi, 80 rpms, Ast 2.32, Art 7.35, Tq 5K, had Hydrates from 2260 to 2408' 18:30 - 20:00 1.50 CASE P SURF Circ, Two bottoms up with 550 gpm, 2300 psi, 80 rpms 20:00 - 22:00 2.00 CASE P SURF PJSM, Pump out to Hwdp 22:00 - 22:30 0.50 CASE P SURF PJSM, Rih wash last stand to bottom 22:30 - 00:00 1.50 CASE P SURF Circ, Three bottoms up with 550 gpm, 2300 psi, 80 rpms 00:00 - 00:30 0.50 CASE P SURF Finish Circ. Three bottoms up 00:30 - 02:00 1.50 CASE P SURF PJSM, Pumping out to Hwdp with full drilling rate 02:00 - 04:30 2.50 CASE P SURF PJSM, Stand back Hwdp, lay down BHA 04:30 - 05:30 1.00 CASE P SURF PJSM, Rig up to run Csg 05:30 - 10:00 4.50 CASE P SURF PJSM, Picking up 103/445# 1-80 Btc csg, total of 65 jts run, broke circ @ 1435', landed csg, shoe @ 2746', Float 2663' 10:00 - 10:30 0.50 CASE P SURF PJSM, Rig down Franks tool, rig up cement head 10:30 - 12:30 2.00 CASE P SURF Circ, with 6 bbls min 200 psi, thin mud for cement job., PJSM on cementing 12:30 - 16:00 3.50 CEMT P SURF Cement with Schumberger with 5 bbls water, test lines to 2500 psi, 5 bbls water,68 bbls 10.3 mud push, drop bottom plug,345 sx(277 bbls), type ASL yield 4.44, mixed @ 10.7, tailed with 371 sxs(77 bbls), Class G, yield 1.17, mixed @ 15.8, drop top plug, kicked out with 30 bbls water, displace with rig 6 bbls min. 226 bbls 9.8 mud, bump plug with 1700 psi, full retums thru out job, 166 bbls good cement to surface, cement job was mixed and displaced @ 6 bbls min., float held 16:00 - 17:00 1,00 CASE P SURF PJSM, Flush Diverter, lay down landing jt, nipple down diverter 17:00 - 18:00 1.00 CASE P SURF PJSM, Clear floor of Csg tools, change out Bales 18:00 - 19:00 1.00 CASE P SURF PJSM, Nipple up FMC Casing head and test to 1000 psi for 10 min. 19:00 - 22:30 3.50 CASE P SURF PJSM, Nipple up BOPS, rig up to test Printed: 5/31/2005 8:03:16 AM BP AMERICA Operati.ons Summary Report Page 2 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 517/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/9/2005 22:30 - 00:00 1.50 CASE P SURF PJSM, Test BOPS and Manifold to 250-3500 psi for 5 min. per test, Hydrill 250-2500 psi for 5 min. per test, the right to witness test was wavier by John Crisp AOOGC, witness by WSL, Hunting and repairing leaks, one leak on manifold packing, one leak on valve to test pump, replace valve 5/10/2005 00:00 - 08:00 8.00 CASE P SURF PJSM, Testing BOPS and Manifold to 250-3500 psi for 5 min. per test, Hydrill 250-2500 psi for 5 min. per test, witness by WSL, Hunting and repairing leaks, one leak on manifold packing, one leak on valve to test pump, replace valve, change 27/8" x 5" VBR's to 4" solid rams 08:00 - 09:00 1.00 CASE P SURF Rig down test equipment - Pull test plug - Install wear ring - Close annulus valves - Change bails - Shuffle HWT 09:00 - 12:00 3.00 CASE P SURF Pick up 87 joints 4" DP from pipe shed - POH standing back same 12:00 - 14:30 2.50 CASE P SURF PJSM - Make up BHA - Bit - motor - MWD - Orient - Flex DC's - HWT - Change out 5" Handling tools to 4" 14:30 - 15:00 0.50 CASE P SURF Surface test MWD 115:00 - 16:00 1.00 CASE P SURF Con't RIH with 4" DP to 2663' - Wash last stand to F/C 16:00 - 17:00 1.00 CASE P SURF Circulate String vol- GPM 400 - PP 1270 17:00 - 18:00 1.00 EVAL P SURF Rig up test equip - Test Casing to 1000 psi for 30 mins - Rig down test equip 18:00 - 19:30 1,50 DRILL P SURF Drill float collar - Shoe trac - Shoe - 20' new hole from 2756' to 2776' 19:30 - 20:00 0.50 CASE P SURF CBU 1 X - GPM 420 - PP 1270 20:00 - 20:30 0,50 CASE P SURF Displace well with 9 ppg LSND mud 20:30 - 21 :30 1.00 EVAL P SURF Rig up testing equipment - Perform ~IT - MD 2746' - TVD 2661 - Mud weight 9 ppg - Surface pressure 280 = EMW 11 ppg - Rig down testing equipment - Blow down choke manifold 21 :30 - 22:30 1.00 DRILL P INT1 Drill from 2776' to 2918' - No MWD detection 22:30 - 23:00 0.50 DRILL N DFAL INT1 Pump out from 2918' to 2740' - Flow check well- Well static- Pump dry job 23:00 - 00:00 1.00 DRILL N DFAL INT1 POOH from 2740' to 712' 5/11/2005 00:00 - 01 :00 1.00 DRILL N DFAL INT1 Stand back HWT - De's - Drain motor - Inspect bit 01 :00 - 01 :30 0.50 DRILL N DFAL INT1 Download MWD - Check electrodes on TM - DM - HOC- Broken connection between the DM I HOC - Change out 01 :30 - 03:00 1.50 DRILL N DFAL INT1 Program MWD - Orient motor - MWD - MU DC's 1st stand HWT - Test MWD - MWD failed incorrect data from directional tool 03:00 - 04:30 1.50 DRILL N DFAL INT1 Stand back HWT - DC's - Drain motor - Download MWD - CIO DM HOC 04:30 - 06:00 1.50 DRILL N DFAL INT1 Program MWD - Orient motor - MU DC's - 1 std HWT - Surface test MWD - MU HWT - Jars 06:00 - 07:00 1.00 DRILL N DFAL INT1 RIH from 712' to 2918' - Wash last stand to bottom - Survey @ 2822' 07:00 - 14:00 7.00 DRILL P INT1 Directional Drill from 2918' to 3968' - WOB 10 to 20 - RPM 80 - TO on 5 - off 3 ~ GPM 525 - PP on 2540 - off 2350 - PU 130- SO 110 - ROT 120 14:00 - 15:00 1.00 DRILL P INT1 CBU - GPM 575 - PP 2740 - RPM 80 - TO - Flow check - Well static 15:00 - 16:00 1.00 DRILL P INT1 Pump out to shoe from 3968' to 2740' - GPM 525 - PP 2744 16:00 - 17:30 1.50 DRILL P INT1 CBU at shoe - Massive clay balls - Plugged flow line - GPM 500 - PP 1670 psi - RPM 40 17:30 - 18:30 1,00 DRILL P INT1 Cut drlg line - Rig service - Top drive service Printed: 5/3112005 8:03:16 AM BP AMERICA Operations Summary Report Page 30f8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 5/7/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/11/2005 18:30 - 19:30 1.00 DRILL P INT1 RIH from 2740' to 3968' - Precauctionary wash last stand to bottom 19:30 - 00:00 4.50 DRILL P INT1 Directional Drill from 3702' to 4351 - WOB 10 to 30 - RPM 80- TO on 5k - off 3k - GPM 530 - PP on 2680 - off 2460 - PU 137 - SO 110 - ROT 126 5/12/2005 00:00 - 00:00 24.00 DRILL P INT1 Directional Drill 9 7/8" hole from 4351' to 5997' - WOB 10 to 30 - RPM 80 to 90 - TO on 8 - off 5 - GPM 550 - PP on 3270 - off 3140 - PU 128 - SO 95· ROT 110 - Top "OA" sand 5310' MD 4448' TVD - Fault 5617' 5/13/2005 00:00 - 08:00 8.00 DRILL P INT1 Directional Drill from 5997' to 6310' - TD 97/8" Hole - WOB 10 to 30 - RPM 80 - TO on 8 - off 6 - GPM 530 - PP on 3500 - off 3260 - PU 120 - SO 85 - ROT 105 08:00 - 09:30 1.50 CASE P INT1 CBU 2 X - GPM 555 - PP 3300 - RPM 80 - TO 6 - Flow check - Well static 09:30 - 13:00 3.50 CASE P INT1 Pump out from 6310' to 2740' - GPM 525 - PP 2980 13:00 - 14:00 1.00 CASE P INT1 CBU 1 X - GPM 525 - PP 2230 14:00 - 15:30 I 1.50 CASE P INT1 RIH from 2740' to 6310' - Hit tight hole @ 4000' to 4100' - work I through without pump or rotation 15:30 - 17:30 I 2.00 CASE P INT1 : CBU 3 X - GPM 550 - PP 3420 - RPM 80 - TO 6 - Flow check - Well Static 17:30 - 21 :00 3.50 CASE P INT1 Pump out form 6310' to 2740' - GPM 525 - PP 2500 21 :00 - 22:00 1.00 CASE P INT1 CBU 1 X - GPM 525 - PP 2000 - Flow Check - Well Static - Pump dry job 22:00 - 23:00 1.00 CASE P INT1 POH from 2740' to 712' to BHA 23:00 - 00:00 1.00 CASE P INT1 LD 5" HWT 5/14/2005 00:00 - 01 :00 1.00 CASE P INT1 Con't Lay down BHA 01 :00 - 01 :30 0.50 CASE P INT1 Pull wear ring - Install test plug 01 :30 - 03:00 1.50 CASE P INT1 Change top rams to 7 5/8" casg rams - Test door seals to 1500 psi for 5 mins - 03:00 - 04:00 1.00 CASE P INT1 Rig up casg tools to run 7 5/8" casg 04:00 - 07:00 3,00 CASE P INT1 PJSM - PU I Run 7 5/8" L-80 - BTC-M - 29.7# casing to shoe 2740' 07:00 - 07:30 0.50 CASE P INT1 Circ casg vol 124 bbls 6.5 bpm @ 400 psi PU 125 SO 115 07:30 - 10:30 3.00 CASE P INT1 Con't RIH with 7 5/8" casg to 6260' 10:30 - 11 :30 1.00 CASE P INT1 PU landing joint - Circ casging volume - Staging up pumps from 2 bpm to 6.5 bpm ICP 520 - FCP 450 - PU 250 - SO 130 11 :30 - 12:00 0.50 CASE P INT1 Land casg - (Float shoe @ 6299' - Float collar 6214') - LD franks fill up tool - RU Cementing head and lines 12:00 - 13:00 1.00 CASE P INT1 Con't circ casg reciprocate pipe 13:00 - 15:00 2.00 CEMT P INT1 Give to Dowell Schlumberger Pump 5 bbls water Test lines to 3000 psi 15 bbls CW-100 50 bbls Mud Push Mixed @ 10,5 ppg Drop bottom plug 150 bbls - 725 sxs 1.16 cf/sx 15.8 ppg Class "G" cement Drop top plug Displace with 287 bbls Oil Base Mud 9.2 ppg Bump plug with 2000 psi - 1000 over circulating pressure Hold for 3 mins - Bleed off pressure floats holding 15:00 - 16:00 1.00 CASE P INT1 Blow down lines - Remove cementing head I lines 16:00 - 17:00 1.00 CASE P INT1 RU 1" hydrill pipe to 7 5/8" blow down head - Void 7 5/8" casing to 60' - Clear rig floor of casg / cementing equipment - LD Printed: 5/3112005 8:03:16 AM BP AMERICA O.perationsSummaryRe.port Page 4 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 517/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/14/2005 16:00 - 17:00 1.00 CASE P INT1 same 17:00 - 17:30 0.50 CASE P INT1 Flush well head & stack with 40 bbls water - Drain stack - LD landing joint 17:30 - 18:00 0.50 CASE P INT1 Install FMC 7 5/8" casing Pack-off - Test to 5000 psi for 10 mins 18:00 - 19:00 1.00 CASE P INT1 Clear rig floor of cementing and casg running tools 19:00 - 20:30 1.50 CASE P INT1 Change casg rams to VBR 2 718" x 5" - Install test plug - test to 250 low 3500 high 5 mins each test - Record on chart - Pull test plug - Install wear ring - Close annulus valves 20:30 - 21:00 0.50 CASE P INT1 Inject 40 bbls water in "OA" at 2 bpm 950 psi for 15 bbls increase to 3 bpm 1040 psi - shut down 750 psi final pressure 21 :00 - 23:30 2.50 CASE P INT1 Mobilize BHA - MU bit - Motor with 1.5 degree bend - Stab - MWD - Orient same - Flex De's - Jar - Surface test MWD 23:30 - 00:00 0.50 CASE P INT1 RIH with 4" DP 5/15/2005 00:00 - 02:30 2.50 CASE P INT1 RIH to 5773' tag cement stringers 02:30 - 03:30 1,00 CASE P INT1 Break Circulation - Wash / Ream from 5770' to 6155' 03:30 - 04:30 1.00 CASE P INT1 Rig up test equip - Test casg to 2500 psi for 30 mins - Record I on chart - Rig down test equip 04:30 - 06:00 1.50 CASE P INT1 Cut Drlg line - Rig service - Top drive service 06:00 - 07:00 1.00 DRILL P INT1 Drill Float collar @ 6214' - Shoe trac - Float shoe 6299' - Clean out rat hole from 6299' to 6310' - Drill 20' new hole from 6310' to 6330' - RPM 30 - TO 2 - GPM 272 - PP 2660 off - on 2840 - WOB5t010 07:00 - 08:00 1.00 CASE P INT1 CBU - Condition mud for FIT - 80 RPM - GPM 272 - PP 2690 - (Freeze protect OA with 100 bbls diesel - 2 to 3 bpm @ ICP 1050 - FCP 750 - Shut in with 750 psi) 08:00 - 09:00 1.00 EVAL P INT1 Rig up testing equip - Perform FIT - MD 6299 - TVD 4386 - MW 9 - Surface pressure 684 = EMW 12.0 - Rig down test equip - Blow down manifold /lines 09:00 - 12:00 3.00 DRILL P PROD1 Directional Drill NC/ND Lateral from 6330' to 6680' - WOB 2 to 10 - RPM 80 - TO on 2.5 - off 2 - GPM 272 - PP on 2930 - off 2810 - PU 120 - SO 88 - ROT 105 12:00 - 13:00 1.00 DRILL P PROD1 Circulate per Geologist 13:00 - 23:00 10.00 DRILL P PROD1 Directional Drill NC/ND Lateral from 6680' to 7504' - WOB 2 to 10 - RPM 80 - TO on 3 - off 3 - GPM 272 - PP on 2990 - off 2850 - PU 120 - SO 85 - ROT 105 23:00 - 00:00 1.00 DRILL P PROD1 Circulate per Geologist 5/16/2005 00:00 - 06:30 6.50 DRILL P PROD1 Directional Drill From 7504' to 8045' - WOB 2 to 5 - RPM 80 - TO on 4 - off 3 - GPM 272 - PP on 3140 - off 3010 -PU 125- SO 75 - ROT 105 06:30 - 08:30 2.00 DRILL P PROD1 CBU 3 X - Clean up hole for open hole side tract - RPM 80 - TO 3.5 - GPM 300 - PP 3550 08:30 - 13:00 4.50 DRILL P PROD1 Pump out from 8045' to 6830' - Packing off - Back ream at 40 rpm gpm 275 - PP 2700 from 6830 to 6660' - Con't pump out rotating @ 40 RPM to 5300' @ 285 gpm - 2460 psi - 40 rpm 13:00 - 13:30 0.50 DRILL P PROD1 CBU 1 X - GPM 275 - PP 2460 psi - RPM 40 13:30 - 14:00 0.50 DRILL P PROD1 RIH from 5300' to 6600' - Wash last stand to bottom 14:00 - 17:00 3.00 DRILL C PROD1 Build trough for open hole sidetract @ 6561' to 6638' 17:00 - 17:30 0.50 DRILL C PROD1 Directional Drill from 6561' to 6716' - WOB 2 to 5 - RPM 80- TO on 4 - off 3 - GPM 272 - PP on 3100 - off 3000 -PU 120- SO 85 - ROT 105 17:30 - 18:00 0.50 DRILL C PROD1 Circulate per Geolgist Printed: 5/3112005 8:03:16 AM BP AMERICA Operations Summary Report Page 5 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 5/4/2005 5/26/2005 Spud Date: 517/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/16/2005 18:00 - 00:00 6.00 DRILL C PROD1 Directional Drill from 6716' to 7215' - WOB 2 to 5 - RPM 80- TO on 4 - off 3 - GPM 284 - PP on 3090 - off 2950 -PU 116- SO 85 - ROT 105 5/17/2005 00:00 - 20:59 20.98 DRILL C PROD1 Directional Drill from 7215' to 8894' - T.D. 63/4" NCIND Lateral - WOB 2 to 5 - RPM 80 - TO on 5 - off 4 - GPM 275 - PP on 3180 - off 2990 - PU 126 - SO 75 - ROT 105 20:59 - 21 :00 0.02 DRILL X MISC PROD1 For DIMS Score 21 :00 - 23:00 2.00 CASE P PROD1 CBU 3 X - GPM 325 - PP 3550 - RPM 90 - TO 5 - Flow check - Well static 23:00 - 00:00 1.00 CASE P PROD1 Pump out from 8894' to 7748' - GPM 300 - PP 2980 5/18/2005 00:00 - 03:30 3.50 CASE P PROD1 Con't pump out from 7748' to 6800' - Packing off - Back ream from 6800' to 6500' - Packing-off some stalling on rotary - pull slow - Back ream from 6500 to 6300' - No packing off hole better - Con't rotating @ 40 RPM and pumping to 5300' 03:30 - 04:30 1.00 CASE P PROD1 CBU 2 X - Lots shale over shakers - GPM 325 - PP 2900 - RPM 40 - TO 2 04:30 - 06:00 1.50 CASE P PROD1 RIH from 5300' to 6734' - Check shot survey to confirm in correct hole - Correct hole - Con't RIH from 6734' to 8894' 06:00 - 08:00 2.00 CASE P PROD1 CBU 3 X - GPM 325 - PP 3620 - RPM 80 - TO 3 - Change screen on shakers from 200 mesh to 230 mesh after 1 st bottoms up 08:00 - 11 :30 3.50 CASE P PROD1 Pump out hole @ GPM 325 - Back ream from the shoe to 5300' at 40 RPM to help clean up cuttings bed in casing 11 :30 - 13:00 1.50 CASE P PROD1 Flow check - Well static - CBU 2 X - GPM 300 - PP 2850 - RPM 40 - Flow check - Well static - Pump dru job 13:00 - 13:30 0.50 CASE P PROD1 Bust Ice out of Derrick 13:30 - 14:30 1.00 CASE P PROD1 POH from 5300' to 2230' 14:30 - 16:00 1.50 CASE P PROD1 Repair hydralic hose on top drive 16:00 - 16:30 0.50 CASE P PROD1 Con't POOH from 2230' to BHA 16:30 - 18:00 1,50 CASE P PROD1 Stand back Flex De's - LD Jar - MWD - Stab - Break bit - Flush motor - LD motor 18:00 - 19:30 1.50 CASE P PROD1 Clear rig floor - RU Liner handling tools - 19:30 - 23:30 4.00 CASE P PROD1 PJSM - PU 4" screen liner- 23:30 - 00:00 0.50 CASE P PROD1 Make up Baker HMC hanger - Baker ZXP packer - Liner weight 42K 5/19/2005 00:00 - 01 :00 1.00 CASE P PROD1 Con't make up Liner hanger and ZXP Packer - Liner weight 42K 01:00 - 02:30 1.50 CASE P PROD1 RIH with liner to 7 5/8· shoe @ 6290' - Break Circulation 02:30 - 04:00 1.50 CASE P PROD1 Con't RIH with 4· Liner on 4· DP from 6290' to 8894' 04:00 - 05:00 1.00 CASE P PROD1 Drop ball - Pump ball down @ 3 bpm 590 psi for 390 stks - Slow to 1 .5 bpm 320 psi - Ball on seat 440 stks pumped - Pressure up to 2000 psi - Slack off 40K - Pressure up to 3800 psi - Bleed off - Pressure up to 3900 psi - Bleed off - Close Annular - Pressure up annulus to 1500 psi hold 2 mins - No pressue on DP - Bleed off - PU 20 - Rotate 20 turns to the right - 1 tum back - Pick up lost 10K - Liner released 05:00 - 06:00 1.00 CASE P PROD1 CBU 1 X - GPM 300 - PP 1100 - No rotation or reciprocating - Flow check - Well static 06:00 - 08:00 2.00 CASE P PROD1 POH with Baker running tools 08:00 - 09:00 1.00 CASE P PROD1 Lay down liner running tool - Clean rig floor 09:00 - 10:00 1.00 STWHIP P PROD2 Pick up 4 3/4· drill collars - 4· HWT - RIH - Pump 6.5 bpm @ 400 psi - To clear drill string 10:00 - 11 :00 1.00 STWHIP P PROD2 Stand back drill string in derrick Printed: 5/3112005 8:03:16 AM BP AMERICA Operations Summary Report Page 6 of8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 5/7/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/19/2005 11 :00 - 14:00 3.00 STWHIP P PROD2 Pick up / make up Baker 7 5/8" whipstock assembly - whipstock - slide - upper / lower starting mills - MWD - Orient - Bumper sub - Surface test MWD - Con't make up DC's - HWT 14:00 - 17:00 3.00 STWHIP P PROD2 RIH with whipstock to 5425' - Fill every 25 stands 17:00 - 17:30 0.50 STWHIP P O"rt PROD2 Orient whipstock to 15 degree left of high side - PU 120 - SO 105 - ROT 110 17:30 - 22:00 4.50 STWHIP P Mi~ing window - TOW 5310' - BOW 5322' - Drlg from 5322' to 5336' - WOM - 2 to 8 - RPM 70 to 110 - TO 3 to 6 - GPM 300 - PP 2150 22:00 - 23:00 1.00 STWHIP P PROD2 CBU - Pump hi-vis sweeps - Work mills through window - RPM 120 - Flow check - Well static 23:00 - 00:00 1.00 STWHIP P PROD2 Pull 5 stands filling with trip tank From 5310' to 4850' - Check for swab / proper hole fill - Pump dry job 5/20/2005 00:00 - 01 :30 1.50 STWHIP P PROD2 POH from 4850' to 860' @ BHA - Stand back DC's - HWT 01 :30 - 02:30 1.00 STWHIP P PROD2 LD MWD - Whipstock milling tools - Top mill in gauge 6 3/4" 02:30 - 03:30 1.00 STWHIP P PROD2 Pull wear ring - Flush BOPs - Re-install wear ring 03:30 - 04:00 0.50 STWHIP P PROD2 Clear / Clean rig floor 04:00 - 05:00 1.00 STWHIP P PROD2 MU 63/4" drlg BHA - PU Bit - Motor - MWD - Orient 05:00 - 07:00 2.00 STWHIP P PROD2 Upload MWD - Surface test MWD - GPM 285 @ 2000 07:00 - 07:30 0.50 STWHIP P PROD2 Load Nukes - RIH with Flex DC's - Jars 07:30 - 09:30 2.00 STWHIP P PROD2 RIH to 5200' - Fill every 25 stands 09:30 - 11 :00 1.50 STWHIP P PROD2 Cut drlg line - Top drive service - Rig service 11 :00 - 11 :30 0.50 STWHIP P PROD2 Orient motor - Slide through window with out pumps on 11 :30 - 00:00 12.50 DRILL P PROD2 Directional Drill "OA" Lateral from 5336' to 6385' - WOB 2 to 6 - RPM 80 to 85 - TO on 4 - off 3 - GPM 300 - PP on 3200 - off 2980 - PU 120 - SO 95 - ROT 110 5/21/2005 00:00 - 11 :30 11.50 DRILL P PROD2 Directional Drill from 6385' to 7426' - WOB 6 to 7 - RPM 80 - TO on 4 - off 3.5 - GPM 288 - PP on 3200 - off 3130 - PU 118- SO 85 - ROT 105 11 :30 - 13:00 1.50 DRILL P PROD2 CBU 2 X - GPM 285 - PP 3260 - RPM 80 - TO 3.5 - Flow check - Well static 13:00 - 15:00 2.00 DRILL P PROD2 Pump out from 7426' to 5346' - Pump at drlg rate - Pull thru window with out pumping or rotating to 5282' - Flow check - Hole static 15:00 - 15:30 0.50 DRILL P PROD2 CBU 1 X - GPM 297 - PP 3000 - RPM 40 - TO 1.5K 15:30 - 16:00 0.50 DRILL P PROD2 Rig service - Top drive - Crown section - Travelling blocks - Drawworks 16:00 - 17:00 1.00 DRILL P PROD2 RIH 5282' to 7330' - (No pump or rotating going thru window) - Precauctionary wash from 7330' to 7426' 17:00 - 00:00 7.00 DRILL P PROD2 Directional Drill from 7426' to 8002' - WOB 2 to 4 - RPM 80 - TO on 4 - off 4 - GPM 285 - PP on 3440 - off 3130 - PU 126- SO 85 - ROT 107 5/22/2005 00:00 - 11 :30 11.50 DRILL P PROD2 Directional Drill 63/4" from 8002' to 8922' - TD "OA" Lateral - (98.7% net to gross - Total pay drilled 3568' - Non pay 44' Out at TOA at TD) - WOB 2 to 5 - RPM 80 - TO on 5 - off 4 - GPM 285 - PP 3340 - off 3180 - PU 126 - SO 75 - ROT 106 11 :30 - 13:00 1.50 CASE P PROD2 CBU 2 X - GPM 297 - PP 3550 - RPM 80 - TO 4 13:00 - 14:00 1.00 CASE P PROD2 Pump out from 8922' to 7426' - Pump out @ drlg rate 14:00 - 15:00 1.00 CASE P PROD2 CBU 1 X - GPM 297 - PP 3300 - RPM 80 - TO 3.5 15:00 - 15:30 0.50 CASE P PROD2 RIH from 7426' to 8870' - Precauctionary wash from 8870' to 8922' 15:30 - 18:00 2.50 CASE P PROD2 CBU 3 X - GPM 297 - PP 3550 - RPM 80 - TO 4 18:00-21:00 3.00 CASE P PROD2 Pump out from 8922' to 5346' - Pump at drlg rate - Pull thru Printed: 5131/2005 8:03:16 AM .; .... BP AMERICA Operations Summary Report Page 7 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 5/7/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/22/2005 18:00 - 21 :00 3.00 CASE P PROD2 window with out pump or rotation from 5346' to 5282' 21 :00 - 22:00 1.00 CASE P PROD2 CBU 1 X - GPM 297 - PP 3300 - RPM 40 - TQ 2 - Flow check - Well static - Pump dry job 22:00 - 00:00 2.00 CASE P PROD2 POH from 5280' to BHA @ 235' 5/23/2005 00:00 - 01 :00 1.00 CASE P PROD2 LD BHA - Flex Dc's - Jars 01 :00 - 01 :30 0.50 CASE P PROD2 Down-load Nukes - Down load MWD 01 :30 - 02:30 1.00 CASE P PROD2 LD MWD - Stab - Break bit - Flush motor - LD motor 02:30 - 03:00 0.50 CASE P PROD2 PU Baker Whipstock retrieving assy - MWD 03:00 - 03:30 0.50 CASE P PROD2 Up-load MWD 03:30 - 04:30 1.00 CASE P PROD2 Orient - Surface test - Con't MU and RIH with BHA 04:30 - 06:30 2.00 CASE P PROD2 RIH with whipstock retrieving assy from 750' to 5280' - Filling every 25 stands 06:30 - 07:00 0.50 CASE P PROD2 Pump 285 GPM @ 1800 psi - Orient hook 15 degree to left of high side - Latch onto whipstock - Pull free with 70K overpull - PU118-S0108 07:00 - 07:30 0.50 CASE P PROD2 CBU 285 GPM @ 1800 psi - Flow check 07:30 - 09:30 2.00 CASE P PROD2 POH with whipstock 09:30 - 11 :00 1.50 CASE P PROD2 LD Whipstock - Retrieving tools 11 :00 - 12:00 1.00 CASE P PROD2 Clear rig floor 12:00 - 12:30 0.50 CASE P PROD2 RU to run 4 1/2" slotted liner 12:30 - 15:30 3.00 CASE P PROD2 PJSM - PU 1 Run 41/2" L-80 12.6# IBT-M Slotted liner 15:30 - 16:00 0.50 CASE P PROD2 Make up Baker hook as per Baker Tech - PU 90K - SO 85K- Block 50K 16:00 - 17:00 1.00 CASE P PROD2 RIH with 41/2" Slotted liner on 4" DP to TOW 5310' - PU 108' SO 100 17:00 - 20:00 3.00 CASE P PROD2 Con't RIH thru window to 8903' shoe depth - 3 Attempts to hook liner - Stack 0 to 25K on hook three times @ 5322' - un-hook liner - RIH 10 below lower window slot - 5322' - to 5332' - Pull back up and re-hook liner @ 5322' to verify good hook - Stack out 30K twice at 5322' 20:00 - 21 :30 1.50 CASE P PROD2 Drop ball 29/32" - Pump 3 pipe volume - No Indication of ball on seat - Drop 1 1/2" ball - Pump ball on seat - Pressure up to 3500 psi release off hook - Pull 2 stands - Lost 15K string weight 21 :30 - 23:30 2.00 CASE P PROD2 Cut drlg line - Rig service - Top drive service 23:30 - 00:00 0.50 CASE P PROD2 POH - Wet 5/24/2005 00:00 - 02:00 2.00 CASE P PROD2 POH with 4 1/2" liner running tool 02:00 - 02:30 0.50 CASE P PROD2 LD Baker running tool 02:30 - 03:00 0.50 CASE P PROD2 Clear I clean rig floor 03:00 - 03:30 0.50 CASE P PROD2 RU liner runnning tools 03:30 - 04:30 1.00 CASE P PROD2 PU I Run Baker LEM assembly 04:30 - 07:30 3,00 CASE P PROD2 RIH with LEM on 4" DP, to 5297' 07:30 - 12:00 4.50 CASE P PROD2 Establish circ 23 spm, 400 psi, latch LEM into hook wall hanger anchor @ 5305, P/U 10K over to insure latch, drop packer setting ball, pressure up to 3K to set ZXP packer, Bleed off, test annulus to 1.5K to verify packer set, with annulus open pressure DP to 4K to release tool, P/U 15K over tool not released, repeat release procedure, did not release, pressure to 5K didn't release, P/U 30K over tool not released, tryed altemative release method, put left hand turn, slacked off 20K, PIU 30K over, didn't release, put more tums to left 3 turns at a time, slacked off 65K than P/U to 35K over, repeat till had a Printed: 5/3112005 8:03:16 AM BP AMERICA Operations Summary Report Page 8 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPE-32 MPE-32 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/4/2005 Rig Release: 5/26/2005 Rig Number: Spud Date: 5/7/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 5/24/2005 07:30 - 12:00 4.50 CASE P PROD2 total of 18 turns to left in pipe, still would not release, Tum back to right only took 9 truns to torq up pipe, picked up 70K over and running tool came free PIU 115K SIO 1 05K top of LEM 5295', Top of Tie back 5258.55' 12:00 - 13:00 1.00 RUNCO RUNCMP PJSM, Displacing OBM wi Brine, Prepare pits f/ displacement 13:00 - 14:00 1.00 RUNCO RUNCMP Displace OBM with 20 bbls LVT-200, 25 bbls High vis brine@ 9.1, 25 bbls brine with 1.5 bbls Safe Surf-O, 25 bbls brine @ 9.1, 200 bbls sea water @ 8.6, 200 bbls brine @ 9.1 14:00 - 15:30 1.50 RUNCO RUNCMP PJSM, clean surface Eqp., flush kill lines, choke and bleeder lines, clean pit #4 for brine. 15:30 - 19:30 4.00 RUNCO RUNCMP PJSM, Poh to 5105, standing in derrick, laying down excess pipe, and running tool 19:30 - 21:00 1.50 RUNCO RUNCMP PJSM, RIH with DC and HWDP, and drill pipe from offside of derrick to 3105' 21 :00 - 22:30 1.50 RUNCO RUNCMP PJSM, POH standing back 4" drill pipe in derrick, laying down HWDP and DC 22:30 - 23:30 I 1.00 RUNCO RUNCMP PJSM, pull wear ring, rig up to test BOPS 23:30 - 00:00 0.50 RUNCO RUNCMP Testing BOPS and manifold to 250-3500 psi for 5 min. per test; Hydril 250-2500 psi for 5 min. per test, the right to witness test was wavier by Chuck Scheave AOOGC, Test was witness by WSL 5/25/2005 00:00 - 10:00 10.00 RUNCO RUNCMP PJSM, Testing BOPS and manifold to 250-3500 psi for 5 min. per test, Hydril 250-2500 psi for 5 min. per test, the right to witness test was wavier by Chuck Scheave AOOGC, Test was witness by WSL, chasing leaks, Kill line valves both leaked HCR and manual, worked and service retested, # 3 and # 2 valve on manifold leaked, repair #2 and 3 valves and retest, pull test plug 10:00 - 11 :00 1.00 RUNCO RUNCMP PJSM, rig up to run ESP pump and control line 11 :00 - 14:30 3.50 RUNCO RUNCMP PJSM, Picking up ESP pump, Control line 14:30 - 22:30 8.00 RUNCO RUNCMP PJSM, Picking up 2 7/8 6.5# L-80 tubing and FMC hanger, total jts run 155 jts, pump @ 5064, XN nipple 4971', GLM 4818', GLM 2017', GLM 147', total LaSalle clamps run 87, PIU 82K, Slo 76K, Block wt 50K 22:30 - 23:30 1.00 RUNCO RUNCMP Land tubing, Test TWC to 1000 psi, lay down landing jt. 23:30 - 23:59 0.48 RUNCO RUNCMP PJSM, Nipple down BOPS 23:59 - 00:00 0.02 RUNCO MISC RUNCMP For DIMS Score 5/26/2005 00:00 - 01 :30 1.50 RUNCO RUNCMP PJSM, Nipple down BOPS 01 :30 - 03:00 1.50 RUNCO RUNCMP PJSM, Nipple up FMC 11" X 2 9/16 ESP tubing head adapter and CIW 2 9/16 5k Tree, test tree and packoff to 5000 psi 03:00 - 03:30 0.50 RUNCO RUNCMP Pull TWC and install BPV ,/ 03:30 - 04:00 0.50 RUNCO RUNCMP Secure well, suck out cellar, make final check ESP conductivity test, rig release for rig move @ 04:00 5/26/2005 27/8 is not freeze protected will be done by MP after rig move Printed: 5/3112005 8:03:16 AM WELL SERVICE REPORT WELL MPE-32 DATE 5/26/2005 AFE MSD337440 JOB SCOPE RWO EXPENSE DAILY WORK FREEZE PROT KEY PERSON LRS-SCHREIBER MINID 0" DEPTH OFT UNIT LRS 64 DAY SUPV HULME NIGHT SUPV UNKNOWN TTL SIZE 0" DAILY SUMMARY (Post RWO FP) T/I/O=OIOIO. Freeze rotect IA w/65 bbls crude & tb w/15 bbls crude. FWP=6001010. Init-> 0 0 0 TIME BPM BBLs FLUID TEMP TBG IA OA COMMENTS 06:00 Start ticket. 06:35 Load crude. 07:03 Load diesel 07:11 Arrive location. MIRU. 07:38 PT to 3000 psi. 07:44 1.3 sta rt crude 100 350 Down IA. 07:55 1.3 15 " " 1100 08:06 1.3 30 " " 1100 08:18 1.3 45 " " 1100 08:33 1.3 65 " " 1100 08:34 RD off IA. RU to tbQ. 08:48 PT to 3500 psi. 08:50 1 start crude 100 1400 Down tbQ. 09:06 1 15 " " 1600 Shutdown. 09:08 Start RD. 11:29 End ticket. ' . Final-> 600 0 0 I FLUID SUMMARY 80 bbls crude SER~CECOMPANY-SER~CE DAILY COST CUMUL TOTAL LITTLE RED $1,293 $1,293 TOTAL FIELD ESTIMATE: $1,293 $1,293 BP AMERICA Page 1 of 1 Leak-Off Test Summary Legal Name: MPE-32 Common Name: MPE-32 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 5/10/2005 FIT 2,746.0 (ft) 2,661.0 (ft) 9.00 (ppg) 280 (psi) 1,524 (psi) 11.03 (ppg) 5/15/2005 FIT 6,299.0 (ft) 4,386.0 (ft) 9,00 (ppg) 684 (psi) 2,735 (psi) 12.00 (ppg) Printed: 5/31/2005 8:03:09 AM Halliburton Sperry-Sun Milne Point Unit BPXA MPE-32L 1 . Job No. AKZZ3696012, Surveyed: 22 May, 2005 Survey Report 16 June, 2005 Your Ref: API 500292326160 Surface Coordinates: 6016520.62 N, 569110.40 E (70027'19.7837" N, 149026'09.6134" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 56.04ft above Mean Sea Level . EipB..........,9i.:&¡'UI! Survey Ref: svy1529 A H Luton Company Halliburton ~perry-Sun Survey Report for MPE-32L 1 Your Ref: AP/500292326160 Job No. AKZZ3696012, Surveyed: 22 May, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates/ c, Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O¡100ft) 5296.48 79.770 97.540 4389.25 4445.29 223,58 N 2067.28E 6016763.37 N 571175.52 E 2063.56 Tie On Point 5310.00 79.380 97.520 4391.70 4447.74 221.84 N 2080.47 E 6016761.75 N 571188.72 E 2,888 2076,77 Window Point 5336.40 82,310 95.360 4395,90 4451.94 218.92 N 2106.36 E 6016759.07 N 571214.64 E 13,726 2102.71 5384.98 81.320 91.390 4402.82 4458.86 216.09 N 2154,35E 6016756.68 N 571262.65 E 8.341 2150.74 5434.10 84.290 87.380 4408.97 4465.01 216.62 N 2203.07 E 6016757.66 N 571311.36 E 10.107 2199.44 5480.19 90.200 83.610 4411.19 4467.23 220.23 N 2248,93 E 6016761.71 N 571357.19 E 15.202 2245.24 . 5528.33 91.120 82,130 4410.63 4466.67 226.21 N 2296,69 E 6016768.12 N 571404.90 E 3.620 2292,90 5575.48 89,980 83,270 4410.18 4466.22 232,20 N 2343.46 I; 6016774,55 N 571451.60 E 3.419 2339.57 5624.35 91.490 88.160 4409.55 4465.59 235.85 N 2392.17 E 6016778,65 N 571500.28 E 10.471 2388,22 5672.30 92.670 92,780 4407.81 4463.85 235.46 N 2440.07 E 6016778.70 N 571548.19 E 9,938 2436.12 5720.65 92.110 95.150 4405.79 4461.83 232,12 N 2488.26 E 6016775.81 N 571596.40 E 5.033 2484.36 5771,07 90.860 95.490 4404.49 4460.53 227.44 N 2538.45 E 6016771.60 N 571646.63 E 2.569 2534,61 5816.94 90.610 99.840 4403.90 4459.94 221.33 N 2583.89 E 6016765.91 N 571692.13 E 9.498 2580.14 5864.08 90.750 99.800 4403,34 4459.38 213,29 N 2630.34 E 6016758.30 N 571738.65 E 0.309 2626,71 5913,39 90.440 99.460 4402.83 4458.87 205.04 N 2678.95 E 6016750.50 N 571787.34 E 0.933 2675,44 5960.50 90.750 99.980 4402,34 4458.38 197,09 N 2725.38 E 6016742.98 N 571833.84 E 1 .285 2721.99 6009.48 90.170 100.930 4401,94 4457.98 188,20 N 2773,55 E 6016734.54 N 571882.08 E 2.272 2770,29 6059.40 89.730 101.150 4401.99 4458.03 178.64 N 2822.54 E 6016725.43 N 571931,17 E 0.985 2819.43 6105.50 88.470 102.370 4402.71 4458,75 169.24 N 2867,67 E 6016716.46 N 571976.38 E 3.804 2864.69 6155.57 88.690 102,250 4403.95 4459,99 158.57 N 2916.57 E 6016706.24 N 572025,38 E 0.500 2913.76 6201,78 88.850 102.240 4404.95 4460.99 148.77 N 2961.72 E 6016696,86 N 572070.61 E 0.347 2959,05 6251,39 88,970 102.600 4405.89 4461.93 138,11 N 3010,16 E 6016686.64 N 572119.15 E 0.765 3007,65 . 6297.51 92.760 102.590 4405.19 4461.23 128.05 N 3055.16 E 6016677,01 N 572164.24 E 8,218 3052.80 6343.33 90.300 101.290 4403.97 4460.01 118.58N 3099.97 E 6016667,95 N 572209.13 E 6.072 3097.75 6394,04 90.070 101.790 4403,81 4459,85 108.43 N 3149.65E 6016658.27 N 572258.91 E 1.085 3147,59 6440.59 90.690 101.190 4403.50 4459.54 99,16N 3195.27 E 6016649.42 N 572304.61 E 1.853 3193.34 6490.11 89,010 101.480 4403.63 4459.67 89.43 N 3243.82 E 6016640.14 N 572353.25 E 3.443 3242.04 6536,27 88.170 100.490 4404.76 4460.80 80.64 N 3289,12 E 6016631,76 N 572398.63 E 2.812 3287.4 7 6586.05 88.110 100.390 4406.38 4462.42 71.62 N 3338.05E 6016623,20 N 572447.64 E 0,234 3336.53 6636,97 88,300 100,570 4407,97 4464.01 62,36 N 3388,09E 6016614.41 N 572497.77 E 0,514 3386,72 6682.52 89,580 101.230 4408.82 4464.86 53,75 N 3432.81 E 6016606.21 N 572542.57 E 3.162 3431,56 6778.23 88.580 100,960 4410.35 4466,39 35.33 N 3526.72 E 6016588.67 N 572636,64 E 1.082 3525.75 6823.00 89.700 100,990 4411.02 4467.06 26.81 N 3570,67 E 6016580.55 N 572680,66 E 2.503 3569.82 6874.84 89.930 100.680 4411.19 4467,23 17.07 N 3621.58 E 6016571.28 N 572731,67 E 0.745 3620,88 6920.64 91.200 101,840 4410.74 4466,78 8,13 N 3666.50 E 6016562.76 N 572776.66 E 3.755 3665,93 16 June, 2005 -14:33 Page 2 0'5 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for MPE-32L 1 Your Ref: AP/500292326160 Job No. AKZZ3696012, SUl1leyed: 22 May, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 6970.74 91.260 101.600 4409.66 4465.70 2.058 3715.54 E 6016553.04 N 572825.80 E 0.494 3715,12 7016.78 92.550 101.630 4408,13 4464.17 11.31 8 3760.61 E 6016544.19 N 572870.96 E 2.803 3760.33 7066.50 89.890 102.200 4407.08 4463.12 21.578 3809.25 E 6016534.38 N 572919.68 E 5.471 3809.12 7114.18 90.510 101,110 4406.91 4462.95 31,21 S 3855,94 E 6016525,18 N 572966.46 E 2,630 3855,96 7163.16 91.370 101.930 4406,11 4462,15 40.99 8 3903.93 E 6016515.85 N 573014.54 E 2.426 3904,09 7207,22 90,140 101,690 4405.53 4461.57 50.00 8 3947.05 E 6016507.23 N 573057.74 E 2.844 3947.35 . 7259.10 90,200 101.800 4405.37 4461.41 60,56 8 3997.84 E 6016497.14 N 573108.63 E 0.242 3998.30 7313,60 90.980 101,520 4404,81 4460.85 71.58 8 4051.22 E 6016486.63 N 573162.11 E 1.521 4051.84 7354.44 93.530 101.000 4403.20 4459.24 79.558 4091.23 E 6016479.03 N 573202.20 E 6.372 4091,98 7405.37 88.870 98.460 4402.14 4458.18 88.158 4141.40 E 6016470.89 N 573252,44 E 10.420 4142,27 7451.72 90.610 96.470 4402.35 4458.39 94,17 S 4187.36E 6016465.30 N 573298.45 E 5.703 4188.31 7499.17 90.330 92.750 4401.96 4458,00 97.988 4234.64 E 6016461,92 N 573345.77 E 7.862 4235.65 7548.00 93.660 91.560 4400,26 4456.30 99.82 8 4283.40 E 6016460.54 N 573394.54 E 7.241 4284.43 7597.49 94.250 91.320 4396.84 4452,88 101.06S 4332.76 E 6016459.76 N 573443.91 E 1.287 4333.80 7643.94 91,720 89.240 4394.43 4450.47 101.288 4379.14 E 6016459,96 N 573490.29 E 7.047 4380.18 7694.04 89.140 90.510 4394.05 4450,09 101,17 S 4429.23 E 6016460.54 N 573540.38 E 5.740 4430.27 7739.97 88.730 90.790 4394.90 4450.94 101.708 4475.15E 6016460.44 N 573586.30 E 1,081 4476.19 7789.89 89.700 90.430 4395,59 4451.63 102.23 8 4525.06 E 6016460.37 N 573636.21 E 2.073 4526.10 7836.17 91.060 90.200 4395.28 4451,32 102.48 8 4571.34 E 6016460.55 N 573682.49 E 2.980 4572.38 7885.62 91.130 89,170 4394.34 4450,38 102,21 8 4620.78 E 6016461.28 N 573731.93 E 2.087 4621.81 7932.55 91 .4 70 88.340 4393.27 4449.31 101.198 4667,68 E 6016462.73 N 573778,82 E 1.911 4668,69 7977. 14 90.820 88.610 4392.38 4448.42 100,008 4712,2!;fE 6016464.33 N 573823.37 E 1,578 4713.23 . 8028.52 89.970 89.670 4392.03 4448.07 99.23 8 4763,62 E 6016465,58 N 573874.74 E 2.644 4764.59 8075.04 90.320 89,670 4391,91 4447.95 98.96 8 4810.14 F 6016466.28 N 573921.25 E 0,752 4811,10 8124,76 90.930 88.890 4391.37 4447.41 98.34 8 4859:85 E 6016467,37 N 573970.96 E 1.991 4860.79 8171.46 91,210 88.810 4390.49 4446.53 97.408 4906.53 E 6016468.74 N 574017.63 E 0.624 4907.46 8221.38 89.770 89.960 4390.07 4446.11 96.87 8 4956.45 E 6016469.74 N 574067.53 E 3.692 4957,35 8270,32 87.960 89.700 4391.04 4447.08 96.728 5005.38 E 6016470.33 N 574116.46 E 3.736 5006.27 8317,54 88.960 90.450 4392.30 4448,34 96.788 5052.58 È 6016470.71 N 574163.66 E 2,647 5053.47 8365,65 87.500 91.430 4393.79 4449.83 97,578 5100.66 E 6016470.37 N 574211.74 E 3.654 5101.56 8413.44 88.710 91.630 4395.37 4451.41 98.85 8 5148.40 E 6016469.54 N 574259.50 E 2,566 5149,32 8459,69 88.940 90.300 4396,32 4452,36 99.63 8 5194.64 E 6016469.19 N 574305,74 E 2,918 5195.56 8510.04 89.370 90.810 4397,06 4453.10 100.118 5244.98 E 6016469.16 N 574356.08 E 1.325 5245.90 8556.92 90.560 92.080 4397.09 4453.13 101.308 5291.84 E 6016468.42 N 574402.95 E 3.712 5292.78 8605,83 88.790 93.210 4397.37 4453.41 103.558 5340.69 E 6016466,61 N 574451.83 E 4.293 5341.66 16 June, 2005 - 14:33 Page 3 of 5 Dril/Quest 3.03.06.008 Halliburton Sperry-Sun Survey Report for MPE-32L 1 Your Ref: AP/500292326160 Job No. AKZZ3696012, Surveyed: 22 May, 2005 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8652.21 88,530 92,640 4398.45 4454.49 105.92 S 5387,00 E 6016464.68 N 574498,15 E 1.350 5388,00 8701.64 87.180 92.680 4400.30 4456.34 108.21 S 5436.34 E 6016462.84 N 574547,51 E 2.732 5437,37 8746.75 91.140 90.610 4400.96 4457.00 109.51 S 5481.42 E 6016461.97 N 574592,60 E 9.905 5482,46 8797.79 97.200 87,550 4397.25 4453.29 108.69 S 5532.29 E 6016463.25 N 574643.46 E 13.292 5533.31 8843.61 97.560 87.250 4391.37 4447.41 106.63 S 5577.68 E 6016465.73 N 574688,83 E 1.019 5578.66 8850.79 97.550 86.950 4390.42 4446.46 106.27 S 5584.79 E 6016466.16 N 574695.93 E 4.144 5585,77 . ~ 8922.00 97,550 86.950 4381,07 4437,11 ~~ 102.52 S 5655.28 E 6016470.57 N 574766.39 E 0.000 5656,19 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 90.890° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8922.00ft., The Bottom Hole Displacement is 5656,21ft., in the Direction of 91.039° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment . 5296.48 5310.00 8922.00 4445.29 4447,74 4437.11 223.58 N 221.84 N 102.52 S 2067.28 E 2080.47 E 5655.28 E Tie On Point Window Point Projected Survey 16 June, 2005 - 14:33 Page 4 of 5 DrillQuest 3.03.06.008 ;"";¡ Milne Point Unit Halliburton Sperry-Sun Survey Report for MPE-32L 1 Your Ref: AP/500292326160 Job No. AKZZ3696012, Surveyed: 22 May, 2005 BPXA Survey too/øroaram for MPE-32L 1 From Measured Vertical Depth Depth (ft) (ft) 0.00 469,00 0,00 468.92 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 469.00 8922.00 . 468.92 AK-1 BP _HG - WellNav Gyro (MPE-32PB1) 4437.11 MWD+IIFR+MS+SAG (MPE-32PB1) . 16 June, 2005 - 14:33 DrillQuest 3.03.06.008 Page 5 of 5 . . FRANK H. MURKOWSKI, GOVERNOR AlfASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Fred Johnson Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519 Re: MPE 32L1 BP Exploration (Alaska), Inc. Permit No: 205-066 Surface Location: 3984'NSL, 2032' WEL, Sec. 25, T13N, RI0E, UM Bottomhole Location: 3893' NSL, 1643' WEL, Sec. 30, TI3N, RIlE, UM Dear Mr. Johnson: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. PIe $e provide at least twenty-four (24) hours notice for a representative of the Commission t w' ness any required test. Contact the Commission's petroleum field inspector at (907) 659- 0 ager). DATED this~day of April, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. I Gal f!nn.. n. la. Type of work o Drill 181 Redrill rb. Current Well Class o Exploratory 181 Development O~_e .L.u,æ,...BIO ORe-Entry o Stratigraphic Test o Service o Development G Zone 2. Operator Name: 5. Bond: 181 Blanket o Single Well 11, Well Name and Number: BP Exploration (Alaska) Inc, Bond No. 2S100302630-277 MPE-32L 1 3. Address: 6, Proposed Depth: 12. Field 1 Pool(s): P,O. Box 196612, Anchorage, Alaska 99519-6612 MD 8898'.1 TVD 4473' f Milne Point Unit I Schrader Bluff 4a. Location of Well (Governmental Section): 7. Property Designation: . ) t> .,. Surface: ADL 0212&1 ty¿'¡ z.~( G·c./o' 3984' NSL, 2032' WEL, SEC, 25, T13N, Rl0E, UM" ,,<{. Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3862' NSL, 2964' WEL, SEC. 30, T13N, R11E, UM (OA) 05/02/05 Total Depth: 9. Acres in Property: 14, Distance to Nearest Property: 3893' NSL, 1643' WEL, SEC. 30, T13N, R11E, UM (OA) I 2560 6950' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 1.5, Dista~arest Well Within Pool Surface: x- 569110- y-6016521 , Zone- ASP4 (Height above GL): 57,8' feet '> 7(x/ ' away from MPE~Q8':- 'Z.. 16. Deviated Wells: Kickoff Depth: 5346' , feet 17. Maximum'Anticipated Pressures in psig (see 20 MC 25.035) Maximum Hole Angle: 90 deQrees Downhole: 1913 Surface: 1467 ll:i. l;asing Program: Specifications Settin!;J Depth ....8yanti!yOf· oeroel1t Size Top, . BottolTl (cJ. . or sacks) Hole CasinQ WeiQht Grade CouDlina Lenath MD TVD MD TVD (includina staae data) 6-3/4" 4-1/2" 12,6# L-80 BTC 3552' 5346' 4468' 8898' 4472' Uncemented Slotted Liner 19, PRESENTWELL CONDITION SUMMARY (To be completed for Redrill ANDRe-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): IEffective Depth TVD (ft):1 Junk (measured): 8906' 4382' NIA 8906' 4382' NIA i Le·n9tt) ii' ~i;¡;e "'Q'Qrmi1// iii' " /·/ME;) /<i TV!:) ii ........ ,. Structural Condur.tor 122' 20" 260 sx Arctic Set (ADDrox.) 122' 122' r 2748' 10-3/4" 1418 sx AS Lite, 371 sx Class 'G' 2748' 2657' Intp.rmp.rli;:¡tp. 6227' 7-5/8" 725 sx Class 'G' 6227' 4357' Production Linp.r 2679' 4" Uncemented Screens 6227' - 8906' 4357' - 4383' Perforation Depth MD (ft): N/A IPerfOration Depth TVD (ft): N/A 20. Attachments o Filing Fee, $100 o BOP Sketch 181 Drilling Program o Time vs Depth Plot o Shallow Hazard Analysis o Property Plat o Diverter Sketch o Seabed Report 181 Drilling Fluid Program 181 20 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Walter Quay, 564-4178 Printed Name Fred Johnson " Title Senior Drilling Engineer 4.40// ;l R ç k Prepared By Name/Number: Siç¡nature A ß~ Phone ~6 '/c<\Y:t 7 Date ,/j~ VJ_ Sondra Stewman, .564-4750 ..... .............Çt... <'.C :;",~.Øih ,. " c· i< i' ,.... , .... Permit To Drill .- ~ I API Number: .' r ~ 2..3 <ó I . Ò Permit Approval tjþitJ? I ~ee cover letter for Number: 2..Q~ - ð 50- O~ - Z - 0 Date: ~ other requirements Condit;ons of Appmvat ~ Requi'ed II Yes g.NO Mud Log Required ( DYes 18No Hy m n Sulfide Measures D Yes ~No Directional Survey Required ~Yes DNo Dthe< ~p;t ~<, \-c:..c,. ~\ö.~~ (~ð( AAomve . /~ rJiv ("j r; : ('\¡,\ f ti ¡ APPROVED BY THE COMMISSION Date Form 1 0-401 ~sed ot~ \..) ! it)¡~\¡fiL ~(¡bmit¡1n Duplicate . STATE OF ALASKA I ALASKA ~ AND GAS CONSERVATION CO ISSION PERMIT TO DRILL 20 MC 25 005 RËCt!(VE:cÆ; A P R '1 9' 2005 ~") Alaab 01 & ~t> f zt ,CÇ I Well Name: I MPE-32 L 1 I Schrader NC/ND & OA Dual Lateral Horizontal Producer Drilling and Completion Plan Summary I Type of Well: I Schrader Bluff Horizontal Producer ObP . Surface Location: (As Proposed) Tl - Top NB Downgoing Side T2 - Top OA on Invert T3 - Base NC/ND on Upgoing Side T4 - Mid NC/ND lateral TS - Mid NC/ND lateral Tl OA Lateral - Mid-oA T2 OA Lateral - Mid-oA T3 OA op OA Distance to Pro e line Distance to nearest well AFE Number: Estimated Start Date: . 3,984' FSL and 2,032' FEL Section 25, T13N, R10E UM E = 569,110' N = 6,016,521' 4,274' FSL and 282' FEL Section 25, T13N, R10E UM E = 570,857' N = 6,016,827' Z = 4,343' TVD 4,206' FSL and 5,159' FEL Section 30, T13N, R11E UM E = 571 ,220' N = 6,016,762' Z = 4,468' TVD 4,083' FSL and 4,302' FEL Section 30, T13N, R11 E UM E = 572,079' N = 6,016,648' Z = 4,357' TVD 4,020' FSL and 3,852' FEL Section 30, T13N, R11 E UM E = 572,530' N = 6,016,590 Z = 4,353 TVD 3,862' FSL and 2964' FEL Section 30, T13N, R11 E UM E = 573,420' N = 6,016,440' Z = 4,368' TVD 3,893' FSL and 1 ,643' FEL Section 30, T13N, R11 E UM E, " 4,020' FSL and 3,852' FEL Section 30, T13N, R11 E UM E = 572 530' N = 6,016,590' Z = 4 452' TVD 3,862' FSL and 2,964' FEL Section 30, T13N, R11 E UM E = 573 420' N = 6 016 440' Z = 4 463' TVD 3,893' FSL and 1,643' FEL Section 30, T13N, R11 E UM =51 ' =, 6,950' 390' from MPE-06 Ri Ri 14 Page 1 . . API Filtrate NC-8 S ud Chlorides < 1500 MW to 9.8 ppg, prior to drilling below the PF for Hydrates LSND API Filtrat 6-8 ~.~~~~ 15 - 21 r Waste Disposal: NO ANNULAR INJECTION. Drill U Ings a en 0 ISpO Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Casingrrubing Program Hole Csg Diam WtlFt Grade Conn Burst Collapse Length Top Bottom Size MDI MDI TVDrkb TVDrkb 42-in 20-in* 92 H-40 Weld 1530 520 122-ft 0 122-ft / 122-ft 13.5-in 10.75-in 45.5 L-80 BTC- 5210 2480 2,748 0 2.748'/ M 2,657 9.875- 7.625-in 29.7 L-80 BTC- 6890 4790 6,227' 0 6,227/ in M 4,357 6.75-in ~(: 4 i'!.§cre~ns 15.2 L-80 2,679 6,227/ 8,906'/ .. J -¡ .- A "o~ .- "t,~v I ~ <) 6.75-in 4 ~" Slotted 12.6 L-80 BTG 3,552 5,346/ OA Liner 4,468 4,472 T"~ ~.~~-\-. , --- Page 2 Cement Prograntt . CasinQ Size 10-3/4",45.5#, L-80, BTC Surface Casing Basis Tail cement = To PF. 40% Excess over Gauge Hole Lead to surface. 150% Excess over Gauge Hole from PF to Surface Total Cement Wash 5 bbl water Volume: 407 bbl 20 bbl CW 100 Spacer 50 bbl of MudPush Lead 330 bbl, 418 sx of ArcticSet Lite: 10.7 ppg and 4.44 ft"/sx Tail 77 bbl, 371 sx "G" mixed at 15.8 Ib/gal & 1.17 ft~/sx ,f ...... ········ff·. < . ·f>,···· ·fVW....... 'ff·...'. VV·".f.<.f>'f >·..ff...f·..···f . Casing Size 7-5/8",29.7#, L-80, BTC-M Intermediate Casing Basis Tail cement = 500' MD above the TUZC. 40% Excess over Gauge Hole Total Cement Wash 5-bbl water Volume: 150 bbl 10 bbl CW 100 Spacer 20 bbl of MudPush Tail 150 bbl, 725 sx "G" mixed at 15.8 Ib/gal & 1.16 ft~/sx Temp BHST ==80°F from SOR Evaluation Program: 13-1/2" Section Open Hole: · Gyro · MWD/GR/RES · IFRlCASANDRA, · S er InSite 9-7/8" Section · MWD/GR/RES · IFRlCASANDRA, · S er InSite Cased Hole: 6-3/4" Section NC/ND Open Hole: ~~~ -~ "'-- -3/4" Section OA Open Hole: · MWD/GR/RES (ABI) · IFRlCASANDRA, er n Ie · MWD/GR/RES (ABI) · IFRlCASANDRA, · S er InSite H Page 3 . . Formation Markers: Formation Tops MD TVD Pore Pressure EMW (ft) (ft) (psi) (Ib/gal) BPRF 1982 1937 816 8.35 Top Ugnu (TUZC) 3995 3798 1624 8.35 Uanu-MA 4350 4054 1735 8.35 Uanu-MB1 4366 4064 1739 8.35 Ugnu-MB2 4472 4128 1767 8.35 Ugnu-MC 4794 4282 1834 8.35 SBF2-NA 4865 4309 1846 8.35 SBF1-NB 4927 4332 1856 8.35 SBE4-NC 5031 4371 1873 8.35 NO 5069 4384 1879 8.35 SBE2-NE 5093 4394 1883 8.35 SBE1-NF 5093 4432 1899 8.35 TSOB- T OP OA 5319 4462 1913 8.35 Recommended Bit Program: 1 13-1/2" o - 2748 2748' Baker Hughes MX-1 2 9-7/8" 2,748' - 6,227' 3479' 3 NC/ND 6-3/4" 6,227' - 8,906' 2679' Hycalog DSX-146 OA 6-3/4" 5,346' - 8,898' 3552' Hycalog DSX-146 Page 4 Well Control: . . Intermediate/Production hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity tests: Kick tolerance: · Integrity tests: · Planned completion fluid: 1,913 psi at 4,432' TVD (OA) 1 ,:!pZ.psiaqßase,çi on a full column of gas at 0.1 psi/ft) 3:Qº~O psi__~ FIT to 11 Ib/gal 20' below the 10-3/4" shoe. 55 Bbls with 9.4 Ib/gal mud at below the 10-3/4" shoe. FIT to 1 0 Ib/gal 20' below the 7-5/8" shoe. Kill Weight Brine, with diesel cap, in intermediate. MOBM in liners. Drilling Hazards & Contingencies: · Running Gravel/heavy clay problems have been encountered in some E-Pad wells. High Vis Mud should be utilized. · Hydrates have been reported on E-Pad. Expected Depth for hydrates 2000' SS to 2500' SS. Keep the Mud as Cool as possible. MW should be 9.8 by the base of the permafrost. Lost Circulation Lost Circulation is not reported as a major problem for E-Pad. Irregardless, of this good drilling practices need to be maintained. Expected Pressures · All Formation are expected to be normally pressured: 8.35 ppg or less. Pad Data Sheet · Please Read the E-Pad Data Sheet thoroughly. Hydrocarbons · Hydrocarbons are possible in the Ugne interval. Faults · Several faults are mapped in the well. Fault #1 in the Upper Ugnu intermediate hole section at 4098' MD(3820' TVDss). Fault #4 is within the OA, near the invert point at 5480'. Fault #5 is mapped in the OA Lateral @ -7200' MD. Faults 1 & 2 are in the NB but should not be intercepted. Hydrogen Sulfide _~ · MPE Pad i not Ignated as an H2S Pad 2S detected from E-Pad wells on the pad: MPE- m 2/2001 MPE-22 46 ppm 2/2001 MPE-04 5 ppm 2/2001 . .. ~ ~o..~V "-. '-ÞoJG:. \,,- ~ Anti-collision Issues f' · MPE-32 passes the Major Risk Criteria. The nearest well, is MPE-08, 72' distant at 1867' MD. Distance to Nearest Property · MPE-32 is planned to be 6950 ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPE-32 is 390 ft from the nearest sand penetration in the MPE-06. Page 5 DRILL & COMPL.l0N PROCEDURE . Pre-Ria Oøerations 1. The 20" conductor will be installed pre-rig. Drillina: 1. MIRT and NU Diverter. 2. Function Test Diverter, PU 4" DP and BHA. 3. Drill 13-1 /2" surface hole to the Schrader Bluff interval. 4. Run and cement 10-3/4" surface casing. 5. ND diverter, install wellhead and NUfTest BOPE. 6. Drill 9-7/8" hole to intermediate casing point. 7. Run and cement 7-5/8" intermediate casing. 8. Displace to MOBM. Drill 6-3/4" NC/ND horizontal production hole. . and set4:Screens. Run whipstock and mill window for OA lateral. Drill 6-3/4" OA horizontal production hole. Retrieve whipstock. Run 4.5" slotted liner and hang off in 7.625" casing RU and Run 2.875" ESP Completion. ND BOP/NU Tree --r-: ~' \ \ N""? T RDMO Doyon 14. dðS'-00G Page 6 MPE-32 Proposed TREE: 2-9/16" 5M WELLHEAD: FMC Gen 5 System 11", 5M Tubing Head: FMC 11" X 2.875" I Orig KB elev (D-14) =' 9.2 PPG Versapro MOBM below Completion DATE REV. BY 04106/2004 w. Quay I 109' 27/8" GLM -150' 2-7/8" 6.5 ppf, L-80, EUE production tubing (Drift 10 = 2.347", cap = 0,00579 bpf) Camco 2 7/8" x 1" sidepocket KBMM GLM 2 Jts above ESP 27/8" XN Nipple. 1 Jt above ESP 10-3/4",45.5# L-80 BTC Csg @ 2,748' MD Centrilift ESP I 6,227'-8,906' I 6-3/4" NC/ND Lateral 4" Screens Baker ZXP Liner Top Packer & Hanger @ 5,xxx' MD - .-.-- -.- -. - - - - ..- - - - - - - .. - . - - - -:-. - - - - - - . - __ .·.·e .....,.... 17-5/8" Casing Shoe @ 6,227' MD I ~":.. ~~ \~'?\.. . tv\"t::S~ LL I 5,346-8,898' I 6-3/4" OA Lateral 4-1/2" Slotted 7-5/8",29.7#, L-80, BTC-M Casing Drift: 6.75" Casing ID: 6.875" COMMENTS Proposed Inverted Multilateral Milne Point WELL: E-32ML API NO: 50-029-- 50-029- 50-029- . 0 ~ ~ot>-O 'r ;<J- ((0''''''' 0 (0 0 îI ~,\..,...,'í:- L--------------J l' CI ~ iN 2600.00 ~ (f I MPU E-PAD I ~- ...c:JJ' I I I lDI 3. .8 I l!: I VICINITY MAP · 33 N.T.S. l .2 I I E-27 .. .. E-32 I I 10. .. E-31 I I E - 28 .. · 4 I 22 . · 1 29i . I I 13 . .5 I I 26 . .30 I I 9 . .6 I 25. .21 I 11 . .7 I . I 18 . .16 I I 20 . · 23 I I 24. · 19 14 . · 12 I I 15. · 17 I 0 I I 0 0 0 I I ~ w 1..1: ::J N 1800.00 + + NOTES LEGEND ~ AS-STAKED CONDUCTOR . EXISTING WELL CONDUCTOR 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, ALASKA, NAD 27. 2. PAD SCALE FACTOR IS 0.9999054. 3. HORIZONTAL AND VERTICAL CONTROL IS BASED ON MONUMENTS CFP-3 AND E-1. 4. ELEVATIONS ARE BPX MILNE POINT DATUM M.S.L. 5. GEODETIC COORDINATES ARE ALASKA ZONE 4, NAD 27. 6. REFERENCE FIELD BOOK: MP05-01 PGS. 1-3, 5-7; DATES OF SURVEY: MARCH 20-21, 2005. ~ ~ ¡ ~ % ~ LOCATED WITHIN PROTRACTED SEC, 25, T, 13 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC GROUND SECTION NO. COORDINA TES COORDINA TES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS MPE-27 Y=6,016,432.08 N 2339.97 70'27'18.924" 70.4552567" 232 3,897' FSL X= 568,984.00 E 1292.02 149'26'13.351" 149.4370419' . 2,159' FEL MPE-28 Y=6,016,385.34 N 2280.04 70'27'18.461" 70.4551281' 229 3,849' FSL X= 569,021.51 E 1292.03 149'26'12.261" 149.4367392' . 2,122' FEL MPE -31 Y= 6,016,497.26 N 2299.98 70'27'19.552" 70.4554311' 22 1 3,960' FSL X= 569,129.11 E 1446.00 149"26'09.070" 149.4358528' '2,014' FEL MPE-32 Y=6,016,520.64 N 2329.99 70'27'19.784" 70.4554956' 223 3,984' FSL / X= 569,110,31 E 1445.97 149'26'09.616" 149.4360044' . 2,032' FEL it DRAWN: KRW ObP CHECKED: JMF DATE, 3/22/05 I DRAWING: SHEET: FRB05 MPE 01-00 MPU [-PAD ~ (ID~~[JœO JOB NO: I 0 3 22 05 ISSUED AS-STAKED INFORMA11ON SC"LE; AS-STAKED WELL CONDUCTOR LOCATIONS 1 OF 1 KRW Mf ENGINEØISANDUflDSUlM:YQA$ MPE-27, MPE-28, MPE-31 and MPE-32 tI01 CST F\A£\IIfXØ L..AN£ '"=200' ~ NO. DATE RE'¥'1S1ON BY CHI< -""""""" COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM Pffin, MPE-32 LJ wp05 (plan MPE-321MPE-32 LJ) BP Amoco Depth Fm nq,ili To SmveyIPlan Too! Created By: Digital Business Client User Date: 3J16J200S 5346.00 ggW.35 Planned: ¡"'W£-31 L1 wp05 V4ö MWD+fFR+MS Cheek.ed: Dare: ~S;;~ ISCWSA 51.80 -- ;;"",;,:,,,;,,,,,, Reviewed: Date: CASING DETAILS SECTION DETAILS Size See MD Iue Azì TVD +N/-S +E/-W DLeg TFace VSec Target No. TVD MD Name 1 4472.80 8898.00 41/2" 4.500 1 ~~:::gg ~ ::~ ¡ :g 2 :j 3 ::~' ~. ::~ 4 5 ¡ ;:¡¡ 10 TARGET DETAILS 6 -¡~ 7 ; ~ MPE-32 L1 TI Mid OA Name TVD +N/-S +E/-W Northing Basting Shape 8 9 i ~ :: ¡:~ ) :~ TI 10 ~.~ MPE-32 L1 T2 Mid OA T2 11 ~: j '~ Ò 5: 1'3 12 ) MPE-32 Ll T3 Top OA FORMATION TOP DETAILS Nmre +Nl-S Eruiling !Atitude LongituOO Sial Nn. TVDI'.!h MDPath Fonnation PIM. MPE-32 -305J}3 6016520Ji9 5W11OJ4 7O"2ï'19.784N 149"16'09Jj!5W NJA No formation on !he we!1pa!h. 35 -r f~'r- i i i TTI , i i T , , .11 i i 1 i r i r i T i r' T ¡. i T i i , 1 -~ , 400 i r j¡¡' i ~ i 1 '" i ¡ ! '" ::ß -" i i 15. Cš 1j '12 450 == " :> ~ tl i ¡ 4l!!Vh!'t i i i ! i IT i 1 - 50 Þ 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 " COMPANY DETAILS REFERENCE INFORMATION SL'RVEY PROGRAM Plan: i\1PE~32Ll wp05 (PIanMPE-32/MPE-32Ll) . BPA1I1oru Depth Fm ~th To Survey/Pian Tool Created By: Digital Business CJient Um- Date: 311612005 5346.00 8898.35 I"l&mOO: MPE-n L ¡ wp05 V40 MWD+WR+MS Checked: Date: ~~;E. ISCWSA 51.io - tI WELL DETAILS mg """".- Name +N/-S Norffiin:g """"" L1titurlt' LoügÍíUde 5Jot SECTION DETAILS PlanMPE-32 212523 -305.Q3 6016520.69 569110.34 70"27'J9.7ß4N J49"26'ú9.615W NlA See MD lnc Azi TVD +N!-g +E!-W DLeg TFaœ VSoc Target TARGET DETAILS 1 < : ¡~ Name TVD +N!-S +FJ-W Northing Basting Shape 2 ~ ¡, j ~ ~ ~ ¡ l:! 3 : ~ ,00 4 ~ ¡ 10 : :: 5 4, [4 i ' ¡ t 6 -¡~ 4 6 1 :: 7 ¡ MBE-32Ll T1 MidOA í 8 :¡ MidOA -I i 9 ¡ :¡ :~ 3 r;;¡; OA 10 j MPE-32 Ll T2 Mid OA 2 ~. nt ¡¡ ~~ ~~: 12 ,j MPE-32 Ll 1'3 Top OA .2 CASING DETAILS FOR-MAnON TOP DETAILS No. TVD MD Name Size No. TVDPath MDPath Formation 1 4472.80 8898,00 4112" 4.500 No fOfmàt;on top details fall on the weUp¡¡¡h. , , , , , , II 150 , , , I i I 1 100 ,. , , I II ,..... , " 1 i ;¡;¡ 1 1 11 i···· g >.if. ~ 50 +' z , , ~ ' I 4! ;¡ 0 (/J Iii I -50 I T 1 , 1500 ::<000 2500 3000 4500 5500 . . Sperry-Sun BP Planning Report Company: Field: Site: Wen: weUpatb: Plan: BP Amoco Milne Point M PIE Pad PIan MPE·32 MPE·32 L 1 MPE-32 L 1 wp05 Principal: Yes Date Composed: Version: Tled·to: 1/2412005 40 From: Definitive Path Field: Milne Point North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 Site: M Pt E Pad TR-13-10 UNITED STATES: North Slope Site Position: Nortblng: 6013798,68 ft From: Map Easting: 569440.72 ft Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Well: Plan MPE-32 Goldberry Well Position: +N/-S +E/-W Position Uncertainty: 2725.23 ft -305.03 ft 0,00 ft Nortbing: Easting : 6016520.69 ft 569110.34 ft Latitude: 70 26 52.982 N Longitude: 149 26 0,655 W Nortb Reference: True Grid Convergence: 0,53 deg Slot Name: Latitude: 70 27 19.784 N Longitude: 149 26 9.615 W Casing Points 8898.00 4472.80 4.500 6.750 4 1/2" Formations 0.00 TSBD-Top OA 0.00 TSBC-Base OA Targets 0.00 0.00 MPE-32 Fault 1 3877.80 887.90 1243.07 6017420.00 570345.00 70 27 28.516 N 149 25 33.095 W -Polygon 1 3877.80 887.90 1243.07 6017420,00 570345,00 70 27 28.516 N 149 25 33,095 W -Polygon 2 3877.80 387.71 1040.40 6016918.00 570147,00 70 27 23.597 N 149 25 39,051 W -Polygon 3 3877.80 -17.92 779.60 6016510.00 569890.00 70 27 19.608 N 149 25 46.714 W -Polygon 4 3877.80 387.71 1040.40 6016918.00 570147,00 70 27 23.597 N 149 25 39,051 W MPE-32 Fault 2 4297.80 492.37 1294.40 6017025.00 570400.00 70 27 24.626 N 149 25 31.589 W -Polygon 1 4297.80 492.37 1294.40 6017025.00 570400,00 70 27 24.626 N 149 25 31.589 W -Polygon 2 4297.80 -167.52 1273.28 6016365.00 570385.00 70 27 18.136 N 149 25 32.213 W MPE-32 Fault 3 4327.80 439,77 1573.96 6016975.00 570680.00 70 27 24.108 N 149 25 23.377 W -Polygon 1 4327.80 439.77 1573.96 6016975.00 570680.00 70 27 24.108 N 149 25 23.377 W -Polygon 2 4327.80 -145.13 1554.53 6016390.00 570666.00 70 27 18.355 N 149 25 23.951 W MPE-32 Poly 4342.80 190,06 1539.63 6016725.00 570648.00 70 27 21.652 N 149 25 24.386 W -Polygon 1 4342,80 441,08 1648.98 6016977.00 570755.00 70 27 24,120 N 149 25 21.173 W -Polygon 2 4342.80 215.47 1602.88 6016751,00 570711.00 70 27 21.902 N 149 25 22.528 W -Polygon 3 4342,80 -218,91 4333.23 6016342,00 573445.00 70 27 17,619 N 149 24 2,328 W -Polygon 4 4342.80 -182.32 5778.76 6016392.00 574890.00 70 27 17.969 N 149 23 19,865 W -Polygon 5 4342.80 6.81 5767.52 6016581.00 574877,00 70 27 19.829 N 149 23 20.191 W -Polygon 6 4342,80 -11.07 4353.16 6016550.00 573463.00 70 27 19.663 N 149 24 1,739 W -Polygon 7 4342.80 294.55 2565.74 6016839,00 571673.00 70 27 22.677 N 149 24 54.242 W MPE-32 Fault 5 4447.80 157.64 3416.59 6016710,00 572525.00 70 27 21.327 N 149 24 29.249 W -Polygon 1 4447,80 157.64 3416.59 6016710.00 572525.00 70 27 21.327 N 149 24 29.249 W . . Sperry-SuD BP Planning Report Targets TVD ft ft -Polygon 2 4447.80 -107.15 3929.21 6016450.00 573040,00 70 27 18.720 N 149 24 14,194 W MPE-32 L 1 T1 Mid OA 4452.80 37.59 3420.48 6016590.00 572530.00 70 27 20,146 N 149 24 29.136 W MPE-32 L 1 T2 Mid OA 4462.80 -120.67 4309.13 6016440.00 573420.00 70 27 18.585 N 149 24 3,034 W MPE-32 L 1 T3 Top OA 4472.80 -87.92 5629.62 6016485.00 574740.00 70 27 18.899 N 149 23 24.244 W MPE-32 Fault 4 4477.80 268.55 2242.46 6016810.00 571350.00 70 27 22.422 N 149 25 3,739 W -Polygon 1 4477,80 268.55 2242.46 6016810.00 571350.00 70 27 22.422 N 149 25 3.739 W -Polygon 2 4477.80 -81,31 2653.27 6016464.00 571764.00 70 27 18.980 N 149 24 51.675 W MPE-32 Fault 6 4507.80 72.89 2310.65 6016615,00 571420.00 70 27 20.498 N 149 25 1,738 W -Polygon 1 4507.80 72.89 2310.65 6016615.00 571420.00 70 27 20.498 N 149 25 1.738 W -Polygon 2 4507.80 -136,19 2746.77 6016410.00 571858.00 70 27 18.440 N 149 24 48.929 W -Polygon 3 4507,80 -277.90 4007.63 6016280.00 573120.00 70 27 17.041 N 149 24 11.893 W -Polygon 4 4507,80 -450.33 4806.14 6016115.00 573920.00 70 27 15.340 N 149 23 48.440 W -Polygon 5 4507.80 -546.20 6515.49 6016035.00 575630.00 70 27 14.385 N 149 22 58.233 W -Polygon 6 4507.80 -450.33 4806.14 6016115.00 573920.00 70 27 15.340 N 149 23 48,440 W -Polygon 7 4507.80 -277.90 4007.63 6016280.00 573120.00 70 27 17.041 N 149 24 11.893 W -Polygon 8 4507.80 -136.19 2746.77 6016410.00 571858.00 70 27 18.440 N 149 24 48.929 W Plan Section Information Jnel dag 5346.00 80.15 98.43 4467.73 222.06 2111.57 0.00 0.00 0.00 0.00 5366,00 81.88 96.75 4470.85 219.46 2131,15 12.00 8.65 -8.42 -44.00 5518.09 93,62 87.06 4476.81 214,48 2282.60 10.00 7.72 -6.37 -39.84 5625.85 93.62 87.06 4470.00 220.00 2390.00 0.00 0.00 0.00 0,00 5807.16 90.69 101,27 4463.14 206.86 2570.22 8.00 -1.62 7.84 101.32 6646.29 90.69 101.27 4452.97 42.83 3393.09 0.00 0.00 0.00 0.00 6674.17 90.00 100.40 4452.80 37.59 3420.48 4.00 -2.49 -3.13 -128.49 MPE-32 L 1 T1 Mid OA 6692.26 89.35 100.73 4452.90 34.27 3438.26 4.00 -3.57 1.81 153,09 7409.02 89.35 100.73 4460.97 -99.13 4142.45 0.00 0.00 0.00 0.00 7577.20 89.40 94.00 4462.80 -120.67 4309.13 4.00 0.03 -4.00 -89.65 MPE-32 L 1 T2 Mid OA 7720.55 89,58 88,27 4464.08 -123,51 4452.40 4.00 0.12 -4.00 -88.27 8898.35 89,58 88.27 4472.80 -87.92 5629.62 0.00 0.00 0.00 0.00 MPE-32 L 1 T3 Top OA E/W ft 98.43 4467.73 4409,93 222.06 2111.57 0.00 6016762.31 571219.56 Start Dir 12/10 96.75 4470.85 4413,05 219.46 2131,15 12.00 6016759.88 571239,16 Start Dir 1 0/1 0 94.56 4474.88 4417.08 216.13 2164.74 10.00 6016756.87 571272.78 MWD+IFR+MS 88,21 4477.73 4419,93 213.73 2264.55 10.00 6016755.39 571372.59 MWD+IFR+MS 87.06 4476.81 4419.01 214.48 2282,60 10.00 6016756.31 571390.63 End Dir : 5518 5600.00 93.62 87.06 4471.63 4413.83 218.67 2364.23 0.00 6016761.26 571472.22 MWD+IFR+MS 5625.85 93.62 87.06 4470.00 4412.20 220.00 2390.00 0.00 6016762.83 571497.97 Start Dir 8/100 5700.00 92.44 92.88 4466.07 4408.27 220.04 2464.01 8.00 6016763.56 571571,97 MWD+IFR+MS 5800,00 90.81 100.71 4463.23 4405,43 208.22 2563.19 8.00 6016752,66 571671.24 MWD+IFR+MS 5807.16 90.69 101.27 4463.14 4405.34 206.86 2570.22 8.00 6016751.36 571678.28 End Dir : 5807 5900.00 90,69 101.27 4462.01 4404.21 188.71 2661.26 0.00 6016734.06 571769.48 MWD+IFR+MS 6000.00 90.69 101.27 4460.80 4403,00 169.16 2759.32 0.00 6016715.42 571867.71 MWD+IFR+MS 6100.00 90.69 101,27 4459.59 4401.79 149.62 2857.39 0.00 6016696.79 571965,94 MWD+IFR+MS 6200.00 90.69 101.27 4458.38 4400.58 130.07 2955.45 0.00 6016678.15 572064.18 MWD+IFR+MS 6300,00 90.69 101.27 4457.16 4399.36 110.52 3053.51 0.00 6016659.52 572162.41 MWD+IFR+MS 6400.00 90.69 101.27 4455.95 4398.15 90.97 3151.58 0.00 6016640.88 572260,64 MWD+IFR+MS . . Sperry-SuD BP Planning Report NIS FJW DLS MapN ft ft deg!10Oft ft 6500.00 90.69 101.27 4454.74 4396.94 71,43 3249.64 0.00 6016622.25 6600.00 90.69 101.27 4453.53 4395,73 51,88 3347.70 0.00 6016603.62 6646.29 90.69 101.27 4452.97 4395.17 42.83 3393.09 0.00 6016594.99 6674.17 90.00 100.40 4452.80 4395.00 37.59 3420.48 4.00 6016590.00 6692.26 89.35 100.73 4452,90 4395.10 34.27 3438.26 4,00 6016586.85 572547.81 End Dir : 6692 6700.00 89.35 100.73 4452.99 4395.19 32.83 3445,87 0.00 6016585.48 572555.43 MWD+IFR+MS 6800.00 89.35 100,73 4454.11 4396.31 14.22 3544.11 0,00 6016567.78 572653.83 MWD+IFR+MS 6900,00 89,35 100.73 4455.24 4397.44 4.39 3642.36 0.00 6016550.08 572752.24 MWD+IFR+MS 7000.00 89.35 100.73 4456.37 4398,57 -23.00 3740,60 0.00 6016532.39 572850.64 MWD+IFR+MS 7100.00 89.35 100.73 4457.49 4399,69 41.62 3838,85 0.00 6016514.69 572949.05 MWD+IFR+MS 7200.00 89.35 100.73 4458.62 4400.82 -60.23 3937.10 0.00 6016496.99 573047.45 MWD+IFR+MS 7300.00 89.35 100.73 4459.74 4401.94 -78.84 4035.34 0.00 6016479,29 573145.86 MWD+IFR+MS 7400.00 89.35 100.73 4460.87 4403.07 -97.45 4133.59 0.00 6016461.59 573244.26 MWD+IFR+MS 7409.02 89.35 100.73 4460.97 4403.17 -99.13 4142.45 0.00 6016460.00 573253.14 Start Dir 4/1 00 7500.00 89.38 97.09 4461.98 4404.18 -113.22 4232.31 4.00 6016446.75 573343,12 MWD+IFR+MS 7577.20 89.40 94.00 4462.80 4405.00 -120.67 4309.13 4.00 6016440.00 573420.00 MPE-32 L 1 T2 7600.00 89.43 93.09 4463.03 4405.23 -122.08 4331.89 4,00 6016438.80 573442,77 MWD+IFR+MS 7700.00 89.55 89.09 4463.93 4406.13 -123.98 4431.85 4.00 6016437.83 573542.73 MWD+IFR+MS 7720.55 89.58 88.27 4464.08 4406.28 -123.51 4452.40 4.00 6016438.50 573563,27 End Dir : 7720 7800.00 89.58 88,27 4464.67 4406.87 -121.11 4531.81 0.00 6016441.63 573642,65 MWD+IFR+MS 7900.00 89.58 88.27 4465.41 4407,61 -118.09 4631.76 0.00 6016445.58 573742.56 MWD+IFR+MS 8000.00 89.58 88.27 4466.15 4408.35 -115.06 4731.71 0.00 6016449.53 573842.46 MWD+IFR+MS 8100,00 89.58 88.27 4466.89 4409.09 -112.04 4831.66 0.00 6016453.48 573942.37 MWD+IFR+MS 8200.00 89.58 88.27 4467.63 4409.83 -109.02 4931.61 0.00 6016457.43 574042.28 MWD+IFR+MS 8300.00 89.58 88.27 4468.37 4410.57 -106.00 5031.56 0.00 6016461,38 574142.19 MWD+IFR+MS 8400.00 89.58 88.27 4469.11 4411.31 -102.98 5131.52 0.00 6016465.33 574242.10 MWD+IFR+MS 8500.00 89.58 88.27 4469.85 4412.05 -99.95 5231.47 0.00 6016469.27 574342,01 MWD+IFR+MS 8600.00 89.58 88.27 4470.59 4412.79 -96.93 5331.42 0.00 6016473.22 574441.92 MWD+IFR+MS 8700.00 89.58 88.27 4471.33 4413.53 -93.91 5431.37 0.00 6016477,17 574541,83 MWD+IFR+MS 8800.00 89,58 88.27 4472,07 4414.27 -90.89 5531.32 0.00 6016481.12 574641.74 MWD+IFR+MS 8898.00 89.58 88.27 4472.80 4415.00 -87.93 5629.27 0.00 6016484.99 574739.65 4 1/2" ./ 8898.35 89.58 88.27 4472.80 ./ 4415.00 -87.92 5629,62 0.00 6016485.00 574740.00 MPE-32 L 1 T3 WELL DETAILS NartW +NI",'S +£I~W -g F..asuns Latitude Longitude SJot Plan MPf",32 272523 ~305.œ 6016520.69 56911034 m'27'19.784N 149~26'09.6í5W N/A ANTI-'COLLISION SETfINGS COMPANY DETAILS BF>i\rIloC-o SURVEY PROGRAM Depth Fm Depdl To SurveyIP!an 5345.00 "8898.35 P!æ:m.ed: MPE~31 U wpOS V4I} Too! MWD+tFR+!\.1S LI wp05 100 o o 320 WELLPA MP£.-32Ll P.aroo! WelJpmk MPE-32 Tw 00 NID: 5346.00 Rig: Ref Damm: 34.3 + 23.5 57.800 Orlgffi """'_ +W.s +EJ-W Prom TVD 9IJ,W 0.00 0.00 34.30 SECTION DETAILS T_ M1'£o·')2 L1 11 Mid OA MP£.32Lî·14·Mid:OA MFE-<}ZLJ T1TopOA . . Sperry-Sun Anticollision Report Co-ordiDate(NE) Rererenee: Vertieal (fVD) Referenee: Time: 13:31:24 Well: Plan MPE-32. True North 34.3 + 23.5 51.8 Company: BP Amoco Field: Milne Point Referenee Site: M PI E Pad Reference WeU: Plan MPE-32 Reference WeUpath: MPE-32 L 1 GLOBAL SCAN APPLIED: AU wellpaths within 200'+ 100/1000 ofreference Interpoiation Method: MD Interval: 25.00 ft Depth Range: 5346.00 to 8898.35 ft Maximum Radius: 1086.40 ft Date: 3/16/2005 Reference: Error Model: Scan Method: Error Suñace: Db:' Oracle Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wellpath Date: 1/24/2005 Validated: No Planned From To Survey ft ft 34,30 1198.80 1198.80 5346.00 5346.00 8898.35 Venion: Toolcode Tool Name Planned: MPE-32 wp10 V79 (0) Planned: MPE-32 wp10 V79 (0) Planned: MPE-32 L 1 wp05 V41 CB-GYRO-SS MWD+IFR+MS MWD+IFR+MS Camera based gyro single shots MWD + IFR + Multi Station MWD + IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in In 8898.00 4412,80 4,500 6.750 4 1/2" Summary - Offset Wellpath :>- Referenee Offset Ctr-Ctr No-Go AUowable Site WeD weUpath MD MD Dlstanee Area Deviation ft ft ft ft ft MPtEPad Jet Plan Jet V2 Plan: Jet 8485.23 7100.00 890.25 217.03 673,22 Pass: Major Risk MPtEPad MPE-04 MPE-04 V3 6399.58 5625.00 670.07 429.99 240.08 Pass: Major Risk MPtEPad MPE-06 MPE-06 V1 5404.41 5025.00 400,77 132.17 268.60 Pass: Major Risk MPtEPad MPE-D8 MPE-D8 V1 5965,35 5500.00 579.60 139.84 439.76 Pass: Major Risk M Pt E Pad MPE-10 MPE-10 V1 7616.43 6850.00 858.25 313,96 544,29 Pass: Major Risk MPtEPad MPE-21 MPE-21 V16 6095.08 5575,00 708,61 198.42 510.19 Pass: Major Risk MPtEPad MPE-21 Plan#1 MPE-21A VO Plan 1579.84 7275.00 715,74 211.24 444.50 Pass: Major Risk MPtEPad Plan MPE-12 MPE-12 V1 Plan: MPE-12 8876,23 8975.00 949.02 216.32 732.11 Pass: Major Risk MPtEPad Plan MPE-32 MPE-32 V3 Plan: MPE-32 5350.00 5350.00 0.01 0.00 0.01 Pass: NOERRORS Site: M Pt E Pad Well: Jet Wellpath: Plan Jet V2 Plan: Jet wp04 V20 Reference Offset MD TVD MD 'IVD ft ft ft ft 7334.89 4460,14 5650.00 3607.70 7351.55 4460.39 5675.00 3618.51 7380.21 4460.65 5700,00 3629.32 7402.86 4460.90 5725.00 3640.13 7420.33 4461.10 5750.00 3650.94 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft AUowablê Deviation ft 957.85 Pass 948.13 Pass 938,42 Pass 928.73 Pass 919.10 Pass Semi-Major Axis Ctr-Ctr No-Go Ref Offset TFO+-AZI TFo-HS CasinglHS)istanee Area ft ft deg deg in ft ft 21.56 26.62 138.63 37.91 9.875 1080,45 122.59 21.68 26.79 138,96 38.24 9.875 1071.88 123.75 21.80 26.95 139.30 38,57 9.875 1063.34 124,93 21.92 27,12 139,64 38.91 9.875 1054,85 126,11 22.03 27.30 139.54 39.26 9.875 1046.43 127.33 7435.86 4461.27 5775.00 3661,75 22.14 27.47 139.29 39,63 9,875 1038.20 128,58 909,62 Pass 7451.40 4461.44 5800.00 3672,57 22,24 27,64 139,05 40.02 9.875 1030.17 129.86 900.31 Pass 7466.92 4461.62 5825.00 3683.38 22.34 27.81 138.83 40.42 9.875 1022.34 131.17 891.11 Pass 7482,44 4461.79 5850.00 3694.19 22.45 27,98 138.63 40,84 9.875 1014.72 132.51 882.22 Pass 7500.00 4461.98 5875,00 3705.00 22.56 28,14 138.37 41.28 9.875 1007.32 133,90 873.42 Pass 7513.44 4462.12 5900.00 3715.81 22.64 28.30 138.28 41.73 9.875 1000.13 135.24 864.89 Pass 7528.92 4462.29 5925.00 3726.62 22.73 28.45 138.13 42.20 9.875 993.17 136.64 856.54 Pass 7544.37 4462.45 5950.00 3737,43 22,82 28.61 138.00 42.69 9.875 986.45 138,06 848.38 Pass 7559,79 4462.62 5975.00 3748.24 22.90 28.75 137.89 43.19 9.875 979.95 139.51 840.44 Pass 7577.20 4462.80 6000.00 3759.05 23.00 28.90 137,72 43.72 9,875 973,70 141.01 832.70 Pass 7590.65 4462.94 6025.00 3769.86 23,07 29.04 137.72 44.25 9.875 967.69 142.47 825.22 Pass 7600.00 4463.03 6050.00 3780.67 23.12 29.19 137,89 44.81 9.875 961.97 143,92 818.04 Pass 7621.49 4463.24 6075.00 3791.48 23.22 29.31 137.61 45,38 9,875 956.44 145.49 810,95 Pass 7636.83 4463.39 6100.00 3802,29 23.29 29.44 137.58 45.97 9.875 951.20 147,02 804.18 Pass 7652.13 4463,53 6125.00 3813.10 23,36 29.57 137.58 46.57 9.875 946.23 148.57 797.66 Pass 7667.37 4463.66 6150.00 3823.91 23.42 29.69 137.59 47,20 9,875 941.54 150.14 791.39 Pass 7682.56 4463.79 6175,00 3834.72 23.49 29.81 137.62 47.83 9.875 937.13 151.73 785.39 Pass . . Sperry-Sun Anticollision Report 7700.00 4463.93 6200.00 3845.53 23,57 29.92 137.58 48.49 9.875 933,00 153.35 779.66 Pass 7712.75 4464,02 6225.00 3856.34 23,62 30,04 137,73 49.15 9.875 929.17 154,93 774.23 Pass 7731.20 4464.16 6250.00 3867.15 23.71 30,17 138,10 49.83 9.875 925,61 156.65 768.96 Pass 7753.38 4464.33 6275,00 3877.96 23.83 30.34 138.79 50.52 9.875 922.21 158.49 763.72 Pass 7775.55 4464.49 6300,00 3888,77 23.95 30.50 139.47 51.21 9.875 918.94 160.34 758.60 Pass 7797.73 4464.65 6325,00 3899.58 24.07 30.66 140.17 51.90 9.875 915.81 162.20 753.61 Pass 7819.91 4464.82 6350.00 3910,40 24.19 30,83 140.87 52.60 9.875 912.81 164,07 748.74 Pass 7842.09 4464.98 6375,00 3921.21 24.31 30.99 141.57 53,30 9.875 909.95 165.94 744.01 Pass 7864.26 4465.15 6400.00 3932.02 24.43 31.15 142.28 54,01 9,875 907.22 167.81 739.41 Pass 7886,44 4465.31 6425.00 3942.83 24.56 31.32 142.99 54,72 9,875 904.64 169.68 734.95 Pass 7908.62 4465.47 6450.00 3953.64 24.68 31.48 143.70 55.43 9.875 902.19 171.56 730.63 Pass 7930,80 4465.64 6475.00 3964.45 24.81 31.64 144.42 56,15 9,875 899.89 173.43 726.46 Pass 7952.97 4465.80 6500,00 3975.26 24.93 31.81 145.14 56.88 9.875 897.73 175.30 722.42 Pass 7975,15 4465.97 6525.00 3986.07 25.06 31.97 145,87 57.60 9,875 895.71 177.17 718.53 Pass 7997.33 4466.13 6550.00 3996.88 25.18 32.14 146.60 58.33 9.875 893.83 179.04 714.80 Pass 8019.51 4466.30 6575.00 4007.69 25,31 32.30 147.33 59.06 9,875 892.10 180.90 711.21 Pass 8041.68 4466.46 6600.00 4018.50 25.43 32.46 148.07 59.80 9.875 890.52 182.75 707.77 Pass 8063,86 4466,62 6625.00 4029.31 25.56 32.63 148.80 60.54 9.875 889.09 184.60 704.49 Pass 8086.04 4466.79 6650.00 4040.12 25.68 32.79 149,54 61.28 9.875 887.80 186.44 701.36 Pass 8108.22 4466,95 6675.00 4050.93 25,81 32.95 150,28 62.02 9.875 886,66 188.27 698.39 Pass 8130.39 4467,12 6700.00 4061.74 25,94 33.12 151.03 62.76 9.875 885.67 190.09 695.58 Pass 8152.57 4467.28 6725,00 4072,55 26,06 33,28 151,77 63.51 9.875 884.83 191.90 692.93 Pass 8174.75 4467.44 6750.00 4083.36 26.19 33.44 152.52 64.25 9.875 884,14 193,69 690.44 Pass 8196.93 4467.61 6775.00 4094.17 26.32 33.61 153.27 65.00 9.875 883.59 195,48 688.12 Pass 8219.10 4467.77 6800,00 4104,98 26.45 33.77 154.01 65.75 9.875 883.20 197.24 685,96 Pass 8241.28 4467.94 6825,00 4115,79 26.57 33,94 154.76 66,49 9.875 882.96 199.00 683,96 Pass 8263,46 4468.10 6850.00 4126.60 26.70 34.10 155.51 67.24 9,875 882.87 200.74 682.14 Pass 8285.64 4468.26 6875.00 4137.41 26.83 34.26 156.26 67.99 9.875 882.94 202.45 680.48 Pass 8307.81 4468.43 6900.00 4148.23 26.96 34.43 157.01 68.74 9.875 883.15 204.16 678.99 Pass 8329.99 4468.59 6925.00 4159,04 27,09 34.59 157.76 69.49 9.875 883,51 205.84 677.67 Pass 8352.17 4468.76 6950.00 4169.85 27.22 34.75 158.50 70.24 9.875 884.02 207.50 676.52 Pass 8374.35 4468,92 6975.00 4180.66 27.35 34.92 159,25 70,98 9.875 884.69 209,15 675.54 Pass 8396.52 4469.09 7000.00 4191,47 27.48 35.08 160.00 71.73 9.875 885.50 210.77 674.74 Pass 8418.70 4469.25 7025,00 4202,28 27.61 35.25 160.74 72.47 9.875 886.46 212.37 674.10 Pass 8440.88 4469.41 7050.00 4213.09 27.74 35.41 161.48 73,21 9.875 887.58 213.94 673.63 Pass 8463.06 4469.58 7075.00 4223.90 27.87 35.57 162,22 73.95 9.875 888.84 215.50 673.34 Pass 8485.23 4469.74 7100.00 4234.71 28.00 35.74 162.96 74.69 9.875 890.25 217.03 673.22 Pass 8507.41 4469,91 7125.00 4245.52 28.13 35.90 163.69 75.43 9.875 891.80 218.54 673.26 Pass 8529.59 4470,07 7150.00 4256.33 28.26 36.07 164.43 76.16 9.875 893.50 220.02 673.48 Pass 8551.77 4470.23 7175.00 4267.14 28.39 36.23 165.16 76.89 9.875 895.35 221.48 673,87 Pass 8573.94 4470.40 7200.00 4277.95 28.52 36.39 165.88 77,62 9,875 897.34 222,91 674.43 Pass 8596.12 4470.56 7225,00 4288,76 28.65 36.56 166.61 78.34 9.875 899.48 224.31 675,16 Pass 8618.30 4470.73 7250.00 4299.57 28.78 36.72 167.33 79.06 9.875 901.75 225.69 676,06 Pass 8640,48 4470.89 7275.00 4310.38 28.91 36.89 168.04 79.77 9,875 904.17 227.05 677.12 Pass 8662.65 4471.06 7300.00 4321.19 29.05 37.05 168.75 80.49 9.875 906.73 228.38 678.36 Pass 8684.83 4471.22 7325.00 4332.00 29.18 37.21 169,46 81.19 9.875 909.43 229.68 679.76 Pass 8707.02 4471.38 7350.00 4342.77 29,31 37.38 170,16 81.90 9.875 912.31 230.95 681.37 Pass 8729.28 4471,55 7375.00 4353.28 29.44 37.54 170.85 82.58 9.875 915.63 232.19 683.44 Pass 8751.62 4471,71 7400,00 4363.47 29.58 37.70 171.51 83.24 9.875 919.40 233,39 686.01 Pass 8774.02 4471.88 7425,00 4373.35 29.71 37.86 172.14 83.88 9.875 923.63 234.55 689.07 Pass 8796.49 4472.05 7450,00 4382.92 29.85 38.02 172.76 84,49 9,875 928.29 235.69 692.60 Pass . . Sperry-SUD Anticollision Report Compagy: BP Amoco Date: 3/1612005 'l'bDê:13:37:24 Fjeld: MikiéPOir'lt Reference Site: MPtEPad Co.ordinate(NE) Referenee: Reference Well: Plan MPE-32 Vertical fOlD) Reference: Reference WeJlpath: MPE-32 1.1 Site: MPtEPad Well: Jet Rule Assigned: Major Risk Wellpath: Plan Jet V2 Plan: Jet wp04 V20 Inter-Site Error: 0.00 ft Reference Offset Semi-Major AxIs Ctr..ctr No-GO ABowable MD 'I'VD MD T\lD Ref Offset TF()..¡.AZI TFo-HS Casin~tanceArea Deviation· ft ft ft ft ft ft deg deg in ft ft ft 8819.01 4472.21 7475.00 4392.17 29.98 38.18 173.35 85.08 9.875 933,37 236.80 696.57 Pass 8841.58 4472.38 7500.00 4401.10 30.12 38.34 173.91 85,65 9.875 938.87 237.88 700.99 Pass 8864.19 4472.55 7525.00 4409.72 30.25 38.50 174,46 86.19 9.875 944,75 238.94 705.81 Pass 8886,81 4472.71 7550,00 4418.27 30.39 38.66 174.99 86,72 9.875 950.79 239.99 710.80 Pass Site: MPtEPad Well: MPE-04 Rule Assigned: Major Risk Wellpath: MPE-04 V3 Inter-Site Error: 0.00 ft Reference Offset SemfMajor AxIs Ctr-ctr No-GO ADowable MD 'I'VD MD 'I'VD Ref Offset TFOtAZI TFo-HS CasinglllS>lstance· Area Deviation ft ft ft ft ft ft c:IEIg c:IEIg in ft ft ft 5359.52 4469,90 4375.00 3586.85 14.01 74.67 130.29 33.00 4.500 1065,08 179,76 885.32 Pass 5399.27 4474.81 4400.00 3605.53 14.16 75.17 128.49 33.88 4,500 1052.01 183.07 868.95 Pass 5435.65 4477.44 4425.00 3624.19 14.27 75.57 126.96 34,67 4,500 1038.68 186.97 851.72 Pass 5468.42 4478.29 4450.00 3642.84 14.35 75.90 125.63 35.42 4.500 1025.26 191.29 833.97 Pass 5497.92 4477.81 4475.00 3661.45 14,42 76.18 124.50 36.16 4,500 1011.82 195.94 815.88 Pass 5521.85 4476.57 4500.00 3680.04 14.47 76.55 123.99 36.93 4.500 998.44 200.75 797.69 Pass 5536.92 4475.62 4525.00 3698.61 14.50 77.28 124.85 37.80 4.500 985.31 205.38 779.92 Pass 5552,00 4474.67 4550.00 3717.14 14.53 78.01 125.75 38.69 4.500 972.48 210.13 762.35 Pass 5567.09 4473.71 4575.00 3735.64 14.57 78,74 126.67 39.61 4.500 959.97 214.98 744.99 Pass 5582.20 4472,76 4600.00 3754.11 14.60 79.47 127.61 40.56 4.500 947.80 219.95 727.84 Pass 5597.36 4471.80 4625.00 3772,53 14.64 80.22 128.58 41.53 4.500 935.96 225.07 710.89 Pass 5612.61 4470.84 4650.00 3790.87 14.67 80.98 129.58 42.52 4.500 924.45 230,27 694.18 Pass 5632.36 4469,59 4675.00 3809.14 14.72 81.89 131.14 43.57 4.500 913.29 235.81 677.47 Pass 5682,35 4466.87 4700.00 3827,34 14.83 83.64 136.28 44,79 4.500 902.11 242.67 659.43 Pass 5735.66 4464.73 4725.00 3845.48 14.89 85.07 141.59 45.92 4.500 890.57 248.87 641,71 Pass 5791.86 4463.35 4750.00 3863.60 14.88 86,07 147.02 46.94 4.500 878.55 254.07 624.48 Pass 5819.68 4462.98 4775.00 3881.70 14.91 86.84 149,12 47.84 4.500 866.15 258.96 607,19 Pass 5836,74 4462.78 4800.00 3899.76 14,96 87.65 150.02 48.75 4,500 853.91 264.07 589.84 Pass 5853.81 4462.57 4825.00 3917.82 15.01 88.46 150.95 49.68 4.500 841.90 269.27 572.63 Pass 5870.87 4462.36 4850.00 3935,89 15.06 89.27 151.91 50.64 4.500 830.18 274.58 555.60 Pass 5887.91 4462.16 4875.00 3953.97 15.11 90,07 152,90 51.63 4.500 818,77 279.99 538.78 Pass 5904.94 4461.95 4900.00 3972.07 15.16 90.88 153.93 52,66 4.500 807.68 285.49 522.19 Pass 5921.98 4461,74 4925.00 3990.15 15.22 91.71 154.99 53,71 4.500 796.91 291.11 505.79 Pass 5939.06 4461,54 4950.00 4008.20 15.27 92.53 156.07 54.80 4.500 786.45 296.80 489.65 Pass 5956,16 4461.33 4975.00 4026,22 15.33 93.36 157.18 55.91 4,500 776.33 302.54 473.79 Pass 5973,30 4461.12 5000.00 4044.21 15,38 94.18 158.32 57.05 4.500 766,55 308.33 458.22 Pass 5990.46 4460.91 5025.00 4062.18 15.44 95.03 159.49 58.22 4.500 757.12 314.21 442.91 Pass 6007.64 4460.71 5050,00 4080.12 15.50 95.88 160.69 59.42 4.500 748.04 320.13 427.91 Pass 6024.84 4460.50 5075,00 4098.05 15,56 96.72 161.91 60.64 4.500 739.33 326.07 413,26 Pass 6042,06 4460.29 5100.00 4115.96 15.62 97,57 163,17 61.90 4.500 730.99 332.01 398.97 Pass 6059.26 4460.08 5125.00 4133,89 15.68 98.41 164.45 63.18 4.500 723.07 337.95 385.11 Pass 6076.42 4459,87 5150.00 4151.85 15.74 99.26 165.78 64.50 4.500 715,60 343,88 371,72 Pass 6093.52 4459.67 5175.00 4169.87 15,80 100.10 167.13 65.86 4.500 708.62 349.79 358.83 Pass 6110.57 4459.46 5200.00 4187.92 15.86 100.94 168.52 67.25 4.500 702.14 355.66 346.48 Pass 6127.61 4459.25 5225,00 4205.99 15.92 101.79 169.94 68.66 4.500 696,16 361.46 334,69 Pass 6144,65 4459.05 5250,00 4224.04 15.99 102.63 171,38 70.11 4,500 690.69 367.17 323.52 Pass 6161.70 4458.84 5275.00 4242.08 16.05 103.47 172.84 71.57 4.500 685.74 372.77 312.98 Pass 6178.76 4458.63 5300.00 4260.11 16,11 104.32 174.33 73.06 4.500 681.33 378.22 303.10 Pass 6195.81 4458.43 5325.00 4278.14 16.18 105.16 175.84 74.56 4.500 677.42 383.53 293.89 Pass 6212.82 4458.22 5350.00 4296,21 16.24 106.01 177.36 76.09 4.500 674.01 388.68 285.33 Pass . . Sperry-SuD Anticollision Report Compauy: BP Amoco . Field: MUne Point Reference Site: M PI E Pad Referenee WeD: Plan MPE-32 Reference WeDpath: MPE-32 L 1 Site: M PI E Pad WeD: MPE-04 WeDpath: MPE-04 V3 Rule Assigned: Major Risk Inter-Site Error: 0.00 ft Pass Pass Pass Pass Pass 6314,49 4456.99 5500.00 4404.97 16.64 111.09 186.78 85,51 4.500 664.32 415.04 249.28 Pass 6331.46 4456.78 5525.00 4423.06 16.71 111.96 188,36 87.09 4,500 664.51 418.60 245.91 Pass 6348.46 4456.58 5550,00 4441,14 16.78 112.83 189.94 88,67 4.500 665.18 421.88 243.31 Pass 6365.48 4456.37 5575.00 4459.19 16.85 113.70 191.52 90.24 4.500 666.33 424.87 241.46 Pass 6382.53 4456.16 5600.00 4477.23 16.92 114.56 193.08 91,81 4.500 667.95 427.57 240.38 Pass 6399.58 4455.96 5625.00 4495,25 16.99 115,44 194.64 93.36 4.500 670.07 429.99 240.08 Pass 6416.62 4455.75 5650.00 4513.29 17.06 116.31 196.18 94.91 4.500 672.74 432.13 240,61 Pass 6433.63 4455.55 5675.00 4531.35 17.14 117,18 197.71 96.44 4.500 675.94 433.97 241,97 Pass 6450.63 4455.34 5700.00 4549.41 17.21 118.05 199.23 97.96 4.500 679,68 435.54 244.14 Pass 6467.64 4455,13 5725.00 4567.47 17,28 118.94 200.73 99.46 4.500 683,90 436,86 247.04 Pass 6484.68 4454.93 5750.00 4585.49 17.36 119.83 202.20 100.93 4.500 688.55 437,92 250.62 Pass 6501.77 4454.72 5775,00 4603.48 17.43 120.71 203.66 102.39 4.500 693.61 438.78 254.83 Pass 6518.89 4454.51 5800.00 4621,44 17.51 121.60 205.09 103.82 4,500 699.08 439.40 259.68 Pass 6536.06 4454.30 5825.00 4639,35 17.58 122.51 206.49 105.22 4.500 704.95 439.86 265.08 Pass 6553.29 4454.10 5850,00 4657.20 17.66 123.43 207.87 106,59 4.500 711.20 440.10 271,10 Pass 6570.58 4453,89 5875.00 4675.00 17.74 124,34 209.21 107,94 4.500 717.84 440.14 277.70 Pass 6587.92 4453,68 5900,00 4692.74 17,81 125.26 210.53 109.26 4.500 724.83 439.98 284.85 Pass 6605.28 4453.47 5925.00 4710.48 17.89 126,17 211.83 110.55 4.500 732.16 439.63 292.53 Pass 6622.59 4453.26 5950.00 4728.26 17.97 127,09 213.10 111.82 4.500 739.82 439.10 300.71 Pass 6639.87 4453.05 5975.00 4746.08 18,05 128.01 214.35 113,07 4.500 747.78 438.38 309.40 Pass 6655.00 4452.88 6000.00 4763.94 18.13 128.93 215.29 114.29 4.500 756.07 437,49 318.58 Pass 6669,02 4452.81 6025.00 4781.81 18.21 129.84 216,04 115.48 4.500 764,72 436,46 328.26 Pass 6693.12 4452.91 6050.00 4799.66 18.31 130.77 217.36 116.63 4.500 773.64 435.42 338.22 Pass 6710,81 4453.11 6075.00 4817.49 18.39 131.69 218.47 117.75 4.500 782.70 434.24 348.46 Pass 6728,53 4453.31 6100.00 4835.30 18.48 132.61 219,57 118.84 4.500 792.00 432,96 359.05 Pass 6746,26 4453.51 6125.00 4853.08 18.56 133.55 220,63 119.90 4.500 801,54 431.63 369.91 Pass 6764.02 4453.71 6150.00 4870.85 18.65 134.49 221.67 120.94 4.500 811.30 430.21 381.09 Pass 6781.79 4453.91 6175.00 4888.61 18.73 135.43 222.69 121.96 4.500 821.27 428.71 392.56 Pass 6799.59 4454.11 6200,00 4906.35 18.81 136.37 223.68 122.95 4.500 831.44 427.12 404.32 Pass 6817.40 4454.31 6225.00 4924.06 18.90 137.33 224.65 123.92 4,500 841.83 425.53 416.30 Pass 6835.23 4454.51 6250.00 4941.76 18.99 138.29 225.59 124.86 4.500 852.44 423.89 428.55 Pass 6853.09 4454.71 6275.00 4959,43 19.07 139.25 226.51 125.78 4.500 863.25 422.20 441.05 Pass 6870.97 4454.91 6300,00 4977.09 19.16 140,21 227.41 126.68 4.500 874.26 420.47 453.79 Pass 6888.89 4455,12 6325,00 4994.71 19.25 141.19 228.28 127.55 4,500 885.43 418.76 466.68 Pass 6906.84 4455.32 6350.00 5012.28 19.34 142.17 229.13 128.40 4.500 896.76 417.02 479.74 Pass 6924.84 4455.52 6375.00 5029,82 19.43 143.16 229.95 129.23 4.500 908.22 415.26 492.96 Pass 6942.87 4455.72 6400.00 5047.32 19,52 144.14 230.76 130.03 4.500 919.81 413.49 506,32 Pass 6960.88 4455.93 6425.00 5064.85 19,61 145.11 231.55 130,82 4.500 931.56 411.63 519.93 Pass 6978.79 4456.13 6450.00 5082.48 19,70 146.08 232.33 131,60 4.500 943.51 409.72 533.78 Pass 6996,60 4456.33 6475.00 5100.21 19,79 147.05 233.09 132.36 4.500 955.64 407,76 547,88 Pass 7014.31 4456,53 6500.00 5118.05 19.88 148.02 233.84 133.11 4.500 967.96 405.75 562.22 Pass 7031.93 4456.73 6525.00 5135.98 19.97 148.95 234.58 133.85 4.500 980.47 403.59 576.88 Pass 7049.45 4456,92 6550.00 5154.01 20.06 149.88 235.31 134.58 4.500 993.15 401.40 591.75 Pass 7066.87 4457.12 6575.00 5172.13 20,14 150.81 236.03 135.30 4.500 1006.01 399,17 606,84 Pass 7084.20 4457.31 6600.00 5190.35 20.23 151,74 236.73 136.00 4.500 1019.04 396.90 622,14 Pass 7101,49 4457.51 6625.00 5208.59 20.32 152.67 237.42 136.69 4.500 1032.22 394.64 637.58 Pass 8 o -6 N o tÕ 149 22 00 \If 1 49 00 VI MPU E-32L 1 Proposed 1-0il Schrader nOAu 2050660 SFD 4/25/2005 . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO BE INCLUDED IN TRANS MITT AL LETTER WELL NAME /11 p¿¿ E -3 ZL I PTD# 2-0 ç - D&ro CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of ~ LATERAL existing well /?? Pfl . 6 - .3 z... PermitNo,~D~PINo. 5"'0 D2/t-2.3 (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(t), all (PH) records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. 2k./- Cú Rev: 04/01105 C\jody\transm ittal_ checklist Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB E-32L 1 PTD#: 2050660 Company BP EXPLORATION (ALASKA) INC Initial ClassfType DEV / PEND GeoArea 890 Unit 11328 1 Permit fee attached ~ . . . . . . NA. . . . . Multilater.al weUbore~ fee waive.d.pe( 20.MC 25~.Q05(e) . . . 2 Le<!se .numbe.r .appropriate Yes ~ . TQP.prQducti.ve interv.al an.d TDio ADL 02.8231.. . . . . . 3 .U.ni.que well.n.ame.and o~mb.e( . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 We.U JQcated in.a. d.efioeJjpool . . . . . . . . . . ~ . . . Yes ~ . MiJn.e point Schrader Blut( Oil I='Qol (525HO), gQverned by CO 477 . . ~ . . . . . ~ ~ . . . . 5 We.IUQcated pr~oper .di.stance. from driJling uoitb.ouod.a(y Yes. . . . . . . CO ~n specifie.s.gove.rome.ntaJ Otr-Qtr-Qt( seçtjo~n~ prOpo$ed. we.lI.cooform$ .tQ thi$ requireme.nt. ........ 6 We.ll JQcated proper .di.stance. from otbe.r wel!s. . ~ . . . . . . . ~ ~ . ~ . . . . . . .Yes . ~ . . CO ~n specifie.s.goveJome.ntaJ Otr-Qtr:Qt( seçtjo.n 7 .S.utficieot acreag,eayailable in.driUiog ~njt . . . . . . . . .. ............ ....... Yes ~ ~ ~ ~ . . . . . ~ ~ . . . . . ~ . . ~ ~ . . . . . . . . 8 Jf.deviated, js weJlbQre platiocJu.ded . ~ ~ . ~ . . . . ~Yes . . ~ ~ ~ . . . . . . . . . . 9 .O,pe(ator only: affected party. . . . . . . . . . . . . . . . . . . . . . . . .. ..... . Yes ...... ~ ~ . . . . . . . . . . . . ~ ~ . . . . . . 10 .O,pe(ator bas.appropriate.bond i.nJorce. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - . . . . . . . . . . . - - - . . . . . . . 11 Pe(mit C<éln be iss~ed wjtbQut conserva.tioo order. ~ . . . . . . . . . . . . . . . Yes ....... . . . . . . . ~ . . . . . Appr Date 12 Pe(mitc.an be i.ss~ed wjtbQut admioist(atille.approval . . . . . . . . . . ~ . . Yes. . ~ . . . . . . ~ . . . . . ~ . . . . . . ~ ~ . . . . . SFD 4/26/2005 13 Can permit be approved before 15-day wait Yes 14 We.IUQcated wi.thio <!rea and strata .authorized by.lojectioo Orde( # (putlO# in.commeotS).(For. .NA . ~ . ~ . . . . . ~ ~ . . . . . . . . ~ . . . . . . . . ~ . . . . . . . . . . . . . . . 15 AJlwel!s.withi.n.1l4.mile.are.a.of(eyiewjdentified(Fo(seNjce.w.ellooly:).. _............ .NA................ _........ _. _.............. - ~............. -............... -- 16 Pre.-produçed injector; Jjurationof pœ-,proJjuctioo less. than 3 montbs. (For.ser:vi.ce well onJy) . . .NA . . . . ~ . . . . . . . ~ ~ . . ~ . . . . . . ~ . . . . . . ~ . . ~ . . . . 17 AÇMP.F:indjng.of Consi.stency~has bee.nJssued.for.tbis project. . . . . . ~ ~ ~ ~ . . . . . . .NA . ~ ~ . . . . ~ . . . . . . . . ~ . . ~ . . . . . . . . ~ ~ . . . . . 18Condu~ctor st(ing.prQvided . ~ . . . . .NA ~ ~ . Con.ductorsetio motherÞore,fI¡1I='E-32. (205-06.5) . . . ~ . . . . . . . ~ . . . . 19Sudacecasiog.protec.ts aU.known USOWs . . . . . . . . . ~ . . . . . . ~ . . NA.. .... All aq.uife.rs exempted,.40.CFR1~7.102(b)13). ~ ~ . . . . . . . . . . . . . . . . 20 .CMT v.ol adeQuate.to çirc.ulate.on.cood.uctor &. SUJf.C$g . . . . . . . . . .NA . . S~rtaçe ca.si.ng setjn motberbQre.. . . . . . . . . . . 21 .CMT vol adeQuate.to tie-i.nJQngstring tosud çsg~ ~ ~ . . . . . . . . . . . . . .. ..... .NA . Interme.diate. casing se.t inmQtherbore.. . ~ ~ . . . . . . . . . ~ . . . . . . . . 22 .CMTwill coyer.a)l J<oo.w.npro.ductiye bori~on.s. . . ~ ~ ~ . . . . . ~ . . . . . . . No . . . . . . . Slotte.dJioe.r.completi.on planoed. ~ . ~ . . . . . ~ . . . . . . . ~ . . . . . . . 23 .Casing designs ade~ua.te fo( C,T, B&permafrost . . Yes. . . . . . . . . . ~ . . . . . . . . . . . ~ . . . . . . . . . . . . 24 .Adequate.tan.kage.oJre.serye pit ~ . . . . . . .. ....... ~ ~ ~ . . . ~. Yes.. . ~ ~ Rig jS.e.quippe.d.with $teel.pjts. . Norese.rve.pjt,planoe.d, All waste toapprove.d.disposal weUs. . . . . . . 25 Jf.a.re-d(ilt hasa 1.0-403 fQr abandOllment beeo apprQved . . . . . . . ~ . . . . . NA ~ ~ ~ . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 .Adequate.wellbore.separatjo.n,pro,poseø.. _.. _.......................... _ .Yes...... .l?ro~imi.ty:analysiSPe.rtorme.d, J(aYeli.ngcy:lioderplotiocJu~ded..Ne.are.st"welJ",is~NC/NDJateral.-jQO~aboYe.~ _.. 27 Jf.djverter Jequire.d, dQe$ jtmeet reguJations. . ~ . . . . . . . NA . . eol=' stack. will al(eady.b.eJo place, ~ . . . . . . . .. ......... ~ ~ . . . . . . . 28 .Drilliogf]ujd.programsc.hematic~&.eQ.uipJistadequate~ ~. ~..... ........ yes..... .Maxjmumexpectedfo(ma.tionpressuœ.8,3.EMW.. PlanoeJjMW9.0JIlSB...... ... ~. ~..... 29 .BOPEs, do they meet.reguJation . ~ ~ . . . . . . . . . . . . . . . Yes. . . . . . . . . . . . . . . . ~ ~ . . . . . ~ . . . . . . . . ~ . . . . . 30 .~BOPE.Pfe.ssratingap,p(op(iate;Jestto.(pu.tpsigin.commeots)....... ~ ~..... Yes ~MASI='Çé!lcuJate.d.atH6'Zpsj..30.00psiBOPJestplçll1n.ed........... ~ ~.. 31 .Chokemanjfold compJies w/API RF'-53 (May 64L . . . . . . ~ . . . . . . ~ . Yes. . . . . ~ ~ . . . . . . . . ~ . . . . . . . . . . . . . ~ . . . . . . . 32 WQrk will occur without,operatjon .shutdown. . . . . . .. ...... ....... .... Yes ~ . . . . . . . . . . . . ~ . . . . . ~ ~ . . . . . . . . . . . . . . . ~ . . . . . . . . . 33 JspresenceQfH2Sgas~probable... ~....... .............. .. No... ~... .1:I2SbasnotbeeoœportedjIlSBwells.. Ri9,i$.equippedwith selJso(s.and alarms. ...... 34 Meçhanicalcood,iti.onotwe.Uswi.thinAORyerifiedCFor.s.ervjœwelJonJy)..... ~. NA....... ~ ~............ ~...... ......... ~........ Administration Engineering Appr Date TEM 4/27/2005 ~~ Geology Appr SFD Date 4/26/2005 Geologic Commissioner: 5>T ..s- Program DEV On/Off Shore On WeU bore seg Annular Disposal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 35 PeOTlit c.an be i.ss~ed wlo. hyd(ogen s.ulfide meas.u(es. . . ~ ~ . . . . . 36D~ata~preseoted on. pote.ntial oveJpres~sure .zooe$. . . ~ ~ ~ . . . . 37 .Sei.smicanalysjs Qf shaJlow 9as.z.ooe.s . . . . . . . 38SeabeØcondjtioo s~rvey .(if ot(-shoœ). ... ~ . . . . . . . . 39 ~ CQntact namelphOlleJor.weekly progresueports [e¡cplorato(yonIYl . . . . . . . . . . . . . Yes ~ ~ . . . . Yes . . WalteJ Quay:, BP.4-26.-05; nQ 1:12S meas!J(ed In.SB atMPUE-Pad~. ~SED. . . . . . . . . . . ~ Expected rese.rvojr ,pre~SSUJe i$ .8.35 ppg EMW; wi]1 be drjlled with 9.0 ppgm~d, . . . . . ~ . . . . . . . . . NA..... NA...... .NA.. ~...... - - - - - - - - - - - - - - - - - - - - - - -- - - - - -- - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - ~ - - - - - Date: Engineering Commissioner: Date Date 1/22/$ ~ D . . . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organíze this category of information. . . ~Ò)- - ú~ l: Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Jun 24 09:07:59 2005 # 13 À f L( Reel Header Service name... ........ ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/06/24 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name........... .....UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments... .... ........ ..STS LIS Writing Library. Scientific Technical Services Tape Header Service name........ .... .LISTPE Date. . . . . . . . . . , . . . . . . . . . .05/06/24 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name... ... ......... .UNKNOWN Continuation Number.... ..01 Previous Tape Name..... ..UNKNOWN Comments.......... ..... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPE-32 L1 500292326160 B.P. Exploration (Alaska) Inc. Sperry Drilling Services 24-JUN-05 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003696012 R. FRENCH E. VAUGHN MWD RUN 2 MW0003696012 R. FRENCH E. VAUGHN MWD RUN 3 MW0003696012 C.A. DEMOSKI E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 MW0003696012 C. ZAWADZKI D. GREEN MWD RUN 7 MW0003696012 J. BOBBITT D. GREEN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 25 13N 10E 3984 2032 MSL 0) 56.04 22.30 # WELL CASING RECORD OPEN HOLE CASING DRILLERS . 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT SIZE (IN) 13.500 9.875 6.750 SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 122.0 2746.0 5310.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE EXITS MPE-32 PB1 AT 5310'MD/4448'TVD VIA A WHIPSTOCK. 4. MWD RUNS 1-3,7 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 7 ALSO INCLUDED AT-BIT INCLINATION (ABI) , COMPENSATED THERMAL NEUTRON (CTN) , AND STABILIZED LITHO-DENSITY (SLD). THE PURPOSE OF MWD RUN 6 WAS TO POSITION THE WHIPSTOCK, MILL THE WINDOW, AND DRILL A BIT OF RAT HOLE. ONLY SROP DATA ARE PRESENTED FOR THIS RUN. 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER PHONE CONVERSATION BETWEEN DENNIS URBAN (BP GEOSCIENTIST) AND BUSTER BRYANT (SDS) ON 4/13/05. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1-3,6,7 REPRESENT WELL MPE-32 L1 WITH API#: 50-029-23261-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8922'MD/4437'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (FIXED HOLE SIZE) . CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) . SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) . SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. SLDSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR-TO-BIT DISTANCE. PARAMETERS UTILIZED FOR POROSITY LOG PROCESSING: . HOLE SIZE: MUD WEIGHT: MUD SALINITY: CHLORIDES (WATER PHASE) FORMATION WATER SALINITY: FLUID DENSITY: MATRIX DENSITY: LITHOLOGY: $ File Header Service name....... ......STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/06/24 Maximum Physical Record..65535 File Type......... .......LO Previous File Name... ....STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPX RPS RPM RPD ROP NPHI FCNT NCNT PEF RHOB DRHO $ 1 . 6.75" 9.35 PPG 238,000-250,000 PPM 21,000 PPM CHLORIDES 1. 0 G/CC 2.65 G/CC SANDSTONE and clipped curves; all bit runs merged. .5000 START DEPTH 77.0 100.5 100.5 100.5 100.5 100.5 115.5 5310.0 5310.0 5310.0 5310.0 5311.0 5311.0 STOP DEPTH 8864.5 8872.0 8872.0 8872.0 8872.0 8872.0 8922.0 8828.5 8828.5 8828.5 8843.5 8843.5 8843.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 6 7 MERGED MAIN PASS. $ MERGE TOP 77.0 2756.0 2918.0 5310.0 5336.0 MERGE BASE 2756.0 2918.0 5310.0 5336.0 8922.0 # Data Format Specification Record Data Record Type..... ...... .......0 Data Specification Block Type. ....0 Logging Direction............ .....Down Optical log depth units..... ......Feet Data Reference Point.......... ....Undefined Frame Spacing.................... .60 .1IN Max frames per record........... ..Undefined . . Absent value........ ..... .........-999 Depth Units. . . : . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 77 8922 4499.5 17691 77 8922 ROP MWD FT/H 0.48 2269.25 199.883 17614 115.5 8922 GR MWD API 9.95 124.41 64.9962 17576 77 8864.5 RPX MWD OHMM 0.38 1824.2 18.1361 17544 100.5 8872 RPS MWD OHMM 0.06 1823.45 21. 794 17544 100.5 8872 RPM MWD OHMM 0.7 2000 29.3564 17544 100.5 8872 RPD MWD OHMM 0.2 2000 36.0313 17544 100.5 8872 FET MWD HOUR 0.09 193.68 0.995616 17544 100.5 8872 NPHI MWD PU-S 11.33 49.21 33.2789 7038 5310 8828.5 FCNT MWD CNTS 105.77 1160.6 247.483 7038 5310 8828.5 NCNT MWD CNTS 13103.5 34521.5 19089.2 7038 5310 8828.5 RHOB MWD G/CM 1.651 2.898 2.19838 7066 5311 8843.5 DRHO MWD G/CM -0.75 0.785 0.0807038 7066 5311 8843.5 PEF MWD BARN 1. 31 14.82 2.50888 7068 5310 8843.5 First Reading For Entire File...... ....77 Last Reading For Entire File..... ..... .8922 File Trailer Service name... ......... .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..05/06/24 Maximum Physical Record..65535 File Type................ LO Next File Name... ....... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.... .......1.0.0 Date of Generation... ....05/06/24 Maximum Physical Record. .65535 File Type... ..... ...... ..LO Previous File Name. ......STSLIB.001 Comment Record FILE HEADER . . FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPS RPX RPM RPD FET ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 77.0 100.5 100.5 100.5 100.5 100.5 115.5 STOP DEPTH 2714.0 2706.5 2706.5 2706.5 2706.5 2706.5 2756.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 08-MAY-05 Insite 66.37 Memory 2756.0 122.0 2756.0 .4 21.4 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL NUMBER 175785 63122 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 .0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: SPUD MUD 9.80 96.0 8.0 700 8.0 2.400 2.010 3.000 4.000 62.0 75.2 62.0 62.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O . . Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing....... ........ ..... .60 .1IN Max frames per record........ .... . Undefined Absent value. .................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 77 2756 1416.5 5359 77 2756 ROP MWD010 FT/H 9.53 2269.25 208.735 5282 115.5 2756 GR MWD010 API 21.73 117.58 62.7237 5275 77 2714 RPX MWD010 OHMM 0.55 108.28 19.7501 5213 100.5 2706.5 RPS MWD010 OHMM 0.1 455.19 31.9425 5213 100.5 2706.5 RPM MWD010 OHMM 0.7 2000 55.0487 5213 100.5 2706.5 RPD MWD010 OHMM 0.33 2000 59.7615 5213 100.5 2706.5 FET MWD010 HOUR 0.14 4.66 0.536841 5213 100.5 2706.5 First Reading For Entire File.. ....... .77 Last Reading For Entire File.... ...... .2756 File Trailer Service name... ......... .STSLIB.002 Service Sub Level Name... Version Number.. .........1.0.0 Date of Generation.. .... .05/06/24 Maximum Physical Record. .65535 File Type.... ........... .LO Next File Name. ......... .STSLIB.003 Physical EOF File Header Service name....... ......STSLIB.003 Service Sub Level Name... Version Number....... ....1.0.0 Date of Generation...... .05/06/24 Maximum Physical Record. .65535 File Type............ ... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY 3 header data for each bit run in separate files. 2 .5000 . VENDOR TOOL CODE RPX FET RPD RPM RPS GR ROP $ START DEPTH 2707.0 2707.0 2707.0 2707.0 2707.0 2714.5 2756.5 STOP DEPTH 2874.0 2874.0 2874.0 2874.0 2874.0 2882.0 2918.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type. ...... ...........0 Data Specification Block Type.....O Logging Direction. ..... ......... ..Down Optical log depth units......... ..Feet Data Reference Point... ......... ..Undefined Frame Spacing...... ............. ..60 .1IN Max frames per record.............Undefined Absent value................ ......-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . . 10-MAY-05 Insite 66.37 Memory 2918.0 2756.0 2918.0 20.7 20.8 TOOL NUMBER 132477 66259 9.875 2746.0 LSND 9.00 53.0 8.5 550 7.8 1.800 1. 580 3.000 2.400 62.0 71.6 63.0 54.0 . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2707 2918 2812.5 423 2707 2918 ROP MWD020 FT/H 32.31 910.55 401.291 324 2756.5 2918 GR MWD020 API 27.55 107.13 62.2747 336 2714.5 2882 RPX MWD020 OHMM 0.38 16.75 10.0242 335 2707 2874 RPS MWD020 OHMM 0.06 26.25 10.8713 335 2707 2874 RPM MWD020 OHMM 7.17 2000 54.5232 335 2707 2874 RPD MWD020 OHMM 0.2 2000 312.828 335 2707 2874 FET MWD020 HOUR 0.09 52 15.607 335 2707 2874 First Reading For Entire File...... ....2707 Last Reading For Entire File.......... .2918 File Trailer Service name......... ....STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.. .....05/06/24 Maximum Physical Record..65535 File Type. .... .......... .LO Next File Name......... ..STSLIB.004 Physical EOF File Header Service name........ .....STSLIB.004 Service Sub Level Name... Version Number;........ ..1.0.0 Date of Generation...... .05/06/24 Maximum Physical Record. .65535 File Type.............. ..LO Previous File Name.. .... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPX RPS RPD RPM GR 4 header data for each bit run in separate files. 3 .5000 START DEPTH 2874.5 2874.5 2874.5 2874.5 2874.5 2882.5 STOP DEPTH 5310.0 5310.0 5310.0 5310.0 5310.0 5310.0 . ROP $ 2918.5 5310.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record. ......... ...Undefined Absent value. ................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 13-MAY-05 Insite 66.37 Memory 5310.0 2918.0 5310.0 19.9 105.6 TOOL NUMBER 132477 66259 9.875 2746.0 LSND 9.00 60.0 8.5 500 8.4 3.200 2.030 2.800 3.500 75.0 122.0 75.0 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 . . RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2874.5 5310 4092.25 4872 2874.5 5310 ROP MWD030 FT/H 1. 06 91 7.77 224.266 4784 2918.5 5310 GR MWD030 API 9.95 124.41 66.4794 4856 2882.5 5310 RPX MWD030 OHMM 1.3 73.64 8.5312 4872 2874.5 5310 RPS MWD030 OHMM 1. 32 80.8 8.64482 4872 2874.5 5310 RPM MWD030 OHMM 1.3 83.04 8.88484 4872 2874.5 5310 RPD MWD030 OHMM 1.4 67.16 8.95938 4872 2874.5 5310 FET MWD030 HOUR 0.11 8.67 0.6582 4872 2874.5 5310 First Reading For Entire File......... .2874.5 Last Reading For Entire File.......... .5310 File Trailer Service name......... ... .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/06/24 Maximum Physical Record. .65535 File Type.. ............. .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number. ........ ..1.0.0 Date of Generation..... ..05/06/24 Maximum Physical Record..65535 File Type.......... ......LO Previous File Name. ..... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ 5 header data for each bit run in separate files. 6 .5000 START DEPTH 5310.0 STOP DEPTH 5336.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): 19-MAY-05 Insite 66.37 Memory 5336.0 5310.0 5336.0 . HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... .......... .....0 Data Specification Block Type.....O Logging Direction............ .... . Down Optical log depth units........ ...Feet Data Reference Point........ ......Undefined Frame Spacing............... ......60 .1IN Max frames per record....... ......Undefined Absent value......... ....... ......-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD060 79.4 82.3 TOOL NUMBER 6.750 5310.0 VERSA PRO 9.35 104.0 .0 239211 .0 .000 .000 .000 .000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 Name Service Unit DEPT FT ROP MWD060 FT/H Min 5310 0.07 Max 5336 12.72 First Reading For Entire File..... .....5310 Last Reading For Entire File....... ....5336 File Trailer Service name... ....... ...STSLIB.005 Service Sub Level Name... Version Number. ....... ...1.0.0 Mean 5323 7.03868 Nsam 53 53 . .0 .0 .0 .0 First Reading 5310 5310 Last Reading 5336 5336 . Date of Generation...... .05/06/24 Maximum Physical Record..65535 File Type....... .........LO Next File Name....... ....STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation.... ...05/06/24 Maximum Physical Record..65535 File Type........... .... .LO Previous File Name... ... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE PEF FCNT NCNT NPHI RPX GR RPS RPM RPD FET RHOB DRHO ROP $ 6 . header data for each bit run in separate files. 7 .5000 START DEPTH 5310.0 5310.0 5310.0 5310.0 5310.5 5310.5 5310.5 5310.5 5310.5 5310.5 5311.0 5311.0 5336.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR SLD CTN EWR4 $ STOP DEPTH 8843.5 8828.5 8828.5 8828.5 8872.0 8864.5 8872.0 8872.0 8872.0 8872.0 8843.5 8843.5 8922.0 BOTTOM) TOOL TYPE DUAL GAMMA RAY STABILIZED LITHO DEN COMP THERMAL NEUTRON Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 22-MAY-05 Insite 66.37 Memory 8922.0 5336.0 8922.0 81.3 97.6 TOOL NUMBER 156436 112439 110041 90518 6.750 5310.0 . # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..... .... ... ......0 Data Specification Block Type. ....0 Logging Direction................ . Down Optical log depth units...........Feet Data Reference Point.......... ....Undefined Frame Spacing.................... .60 .1IN Max frames per record.. ......... ..Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . VERSA PRO 9.35 105.0 .0 232727 .0 .000 .000 .000 .000 .0 118.4 .0 .0 Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 NPHI MWD070 PU-S 4 1 68 32 9 FCNT MWD070 CNTS 4 1 68 36 10 NCNT MWD070 CNTS 4 1 68 40 11 RHOB MWD070 G/CM 4 1 68 44 12 DRHO MWD070 G/CM 4 1 68 48 13 PEF MWD070 BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5310 8922 7116 7225 5310 8922 ROP MWD070 FT/H 1 689.37 169.398 7172 5336.5 8922 GR MWD070 API 41.73 102.72 65.7979 7109 5310.5 8864.5 RPX MWD070 OHMM 4.76 1824.2 23.9052 7124 5310.5 8872 RPS MWD070 OHMM 4.88 1823.45 23.8741 7124 5310.5 8872 RPM MWD070 OHMM 2.89 1823.12 23.3727 7124 5310.5 8872 RPD MWD070 OHMM 0.59 1822.87 24.351 7124 5310.5 8872 FET MWD070 HOUR 0.26 193.68 0.874989 7124 5310.5 8872 NPHI MWD070 PU-S 11.33 49.21 33.2789 7038 5310 8828.5 FCNT MWD070 CNTS 105.77 1160.6 247.483 7038 5310 8828.5 NCNT MWD070 CNTS 13103.5 34521.5 19089.2 7038 5310 8828.5 . . . RHOB MWD070 G/CM 1.651 2.898 2.19838 7066 5311 8843.5 DRHO MWD070 G/CM -0.75 0.785 0.0807038 7066 5311 8843.5 PEF MWD070 BARN 1. 31 14.82 2.50888 7068 5310 8843.5 First Reading For Entire File...... .., .5310 Last Reading For Entire File.. ........ .8922 File Trailer Service name. ........... .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..05/06/24 Maximum Physical Record. .65535 File Type... ..... ...... ..LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name....... ......LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/06/24 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.............. ..UNKNOWN Continuation Number.... ..01 Next Tape Name...... .....UNKNOWN Comments... ..... ........ .STS LIS writing Library. Scientific Technical Services Reel Trailer Service name........ .....LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/06/24 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name. .... .......... . UNKNOWN Continuation Number.... ..01 Next Reel Name....... ... . UNKNOWN Comments..... ... ....... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File