Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-075• • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~, ~~ - ~ ~ ~ Well History File Identifier Organizing (done> ^ Two-sided III IIIII II III II III ^ Rescan Needed III IIIII II II III III RESCAN DIGITAL DATA OVERSIZED (Scannable) olor Items: ~iskettes, No. a ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ~' 6 /s/ Protect Proofing III 111111 IIIII IIIII BY: Maria Date: I ~ ~` ~ /s/ Scanning Preparation ~ x 30 = ~ o ~ + ~Q_ =TOTAL PAGES ~ 3 (Count does not include cover sheet) BY: Maria Date: ~ r /~~ ~D ~' lsl ~, Production Scanning Stage 1 Page Count from Scanned File: L 3 ~ (count does include cover sheet) Page Count Matches Number in Scanning Preparation: (~ YES NO BY: Maria pate: ~' / `~~ ~ ~ ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria pate: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II IIIII ReScanned II I II'II) II IN I I III BY: Maria Date: !s/ Comments about this file: Quality Checked III IIIII III III III 10/6!2005 Well History File Cover Page.doc ~• ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 Apri126, 2009 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: __.-.. ~- • ~~ ~ ~~ ~~~ . ~s ~_ ®,m3 ~'~;~ Enclosed please fmd the 10-404 Re ort of Sundry Well Operations for ConocoPhillips Alaska, Inc. wells 1E-170, 1E-170L 1E-170L2 concentric gaslift mandrel installation. Please call Brent Rogers or myself if you have any questions. Sincerely, r~~nui,~ Martin Walters Problem Well Supervisor -- - _ S„~^' ~~~G~ APR 3 0 2009 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION asks Dil & Gas Cons. Commission REPORT OF SUNDRY WELL OPERATION Ancnoraae 1. operations Performed: Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ~ Install CGLM Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, InC. Development ~ Exploratory ^ 205-075 3. Address: Stratigraphic ^ Service ^ 6. API Number: P. O. Box 100360, Anchors e, Alaska 99510 50029232646000' 7. KB Elevation (ft): 9. Well Name and Number: RKB 42' 1 E-170L1 ' 8. Property Designation: 10. Field/Pool(s): ADL 25660 ' Kuparuk River Field /West Sak Oil Pool 11. Present Well Condition Summary: Total Depth measured 15940' feet true vertical 3354' feet Plugs (measured) Effective Depth measured feet Junk (measured) true vertical feet Casing Length Size MD ND Burst Collapse Structural CONDUCTOR 120' 20" 162' 162' SURFACE 5011.51' 13-3/8" 5054.34' 2312' INTERMEDIATE' 10372' 9-5/8" 10414' 3451' D-SAND WINDOW 10' 9-5/8" 9412' 3276' B-SAND WINDOI 5' 9-5/8" 9879' 3350' B SAND LINER 5795' 5-1/2" 15745' 3235' Pertoration depth: Measured depth: Intervals from 10,050' - 15,701' true vertical depth: Intervals from 3238' -3341' Tubing (size, grade, and measured depth) 4-1 /2", L-80, 9386.74' MD. 2.441° Concentric GLM set in CMU sliding sleeve @ 9221' MD Packers &SSSV (type & measured depth) BakerZXP 9308' SSSV = 3.875 "DB" Nipple at 558' 12. Stimulation or cement squeeze summary: Intervals treated (measured) Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation N/A N/A N/A NIA N/A Subsequent to operation N/A N/A N/A N/A N/A 14. Attachments 15. Well Class after work: Copies of Logs and Surveys run _ Exploratory ^ Development ^~ ~ Service ^ Daily Report of Well Operations X 16. Well Status after work: CQ / Ga~ WAG^ GINJ ^ WINJ ^ WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA ff C.O. Exempt: N/A contact Brent Rogers/Martin Walters Printed Name Martin Walters Title Problem Well Supervisor ~~ Signature ~ r~ /~ , v(/ 659-7224 Date ~I ~ 4/26/2009 Form 10-404 Revised 04/2006 ~--- Submit Original O 1 E-170 DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 4/7/2009 SET CAT-SV @ 9277 CTMD, FLUID PACK TUBING & IA WITH 663 BBLS DIESEL, PERFORMED SUCCESSFUL TXIA MIT 4/8/2009 CLOSED CMU, PERFORMED SUCCESSFUL TUBING MIT, PULLED CAT-SV & OPENED CMU. UNABLE TO SET CONCENTRIC GLM. RTN IN A.M. 4/11/2009 SET CONCENTRIC GLM IN CMU @ 9213 CTMD, JOB COMPLETE, 4/15/2009 Re-TIFL (passed ), T/I/0= 225/850/5. SI well and gas lift, shot initial IA-FL @ 9101'. Stacked well T/I/0= 675/700/5. Bled IA, T/I/0= 725/300/0. Shot second IA-FL @ same location. 15 min post bleed and final T/I/0= 725/300/0. i STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION R~~EI`/E® DEC 2 3 2008 REPORT OF SUNDRY WELL OPERAThQ~~;i & Gas Cons. Commission 1. Operations Performed: Abandon ^ Repair Well ^ Plug Pertorations ^ Stimulate ^ Otl(>~1Cr10f~ Alter Casing ^ Pull Tubing ^ Pertorate New Pool ^ ESP to Gaslift Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdown^ Perforate ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Status: 5. Permit to Drill Number: ConoCOPhllllps Alaska, InC. Development ~ Exploratory ^ 205-075 3. Address: Stratigraphic ^ Service ^ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-23264-60 7. KB Elevation (ft): 9. Well Name and Number: RKB 41' 1 E-170L1 8. Property Designation: 10. Field/Pool(s): ADL 25660 Kuparuk River Unit /West Sak Oil Pool 11. Present Well Condition Summary: Total Depth measured 15756' feet true vertical 3234' - feet Plugs (measured) Effective Depth measured 15756 feet Junk (measured) true vertical 3234 feet Casing Length Size MD ND Burst Collapse CONDUCTOR 120' 20" 120' 120' SURFACE 5054' 13-318" 5054' 2312' WINDOW D 10' 9-5/8" 9412' 3275' WINDOW B 5' 9-5/8" 9879' 3350' INTERMEDIATE 9879' 9-5/8" 9879' 3350' LINER B 5972' S-1/2" 15745 3235' Perforation depth: Measured depth: 10050-12145, 12576-13938, 13940-15657, 15658-15701 true vertical depth: 3338-3323, 3314-3280, 3280-3240, 3240-3 Tubing (size, grade, and measured depth) 4.5, L-80, 4990' MD . Packers &SSSV (type & measured depth) Packer =None 0 SSSV= None 0 12. Stimulation or cement squeeze summary: Intervals treated (measured) Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation 392 375 23 272 266 Subsequent to operation 460 62 501 273 14. Attachments 15. Well Class after proposed work: Copies of Logs and Surveys run _ Exploratory ^ Development 0 • Service ^ Daily Report of Well Operations X 16. Well Status after proposed work: Oil^ ~ Gas^ WAG^ GINJ^ WINJ ^ WDSPL^ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA contact B. Christensen/ D. Humphrey Printed Name Darrell R. Humphrey Title Production Engineering Specialist Signature , Phone: 659-7535 Date ,.; Form 10-404 Revised 04/2004 ~~'" .Submit Original Only '~ S • 1 E-170L1 DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 12/04/08 12/05/08 EE~L~Z~bI:3 12/07/08 12/12/08 12/16/08 CLEAN DOWN TO TOP OF SLIP-STOP @ 4913' CTMD.MADE MULTIPLY ATTEMPTS TO START ESP WITH NO SUCCESS. RETURN IN AM TO START PULLING SLIP-STOP, PACKOFF AND ESP TO TEST MOTOR. RIH WITH 4" GS SPEAR AND PULLED SLIP-STOP, PACKOFF ASSEMBLY AND ESP. USE DEPLOYMENT FLANGE ON TREE TO HOLD ESP UNTIL SLICK-LINE CAN PULL PUMP. CYCLE ESP UP & DOWN TO CONFIRMED PUMP MOVE FREELY) PULLED & LAYED DOWN 4-1/2" x 47' 10" FC6000 ESP FROM DEPLOYMENT FLANGE. READY FOR CTU. RIH AND CLEAN TUBING DOWN TO TOP INTAKE CROSSOVER @ 4966' CTMD. WHILE MAKING UP BAKER BHA TO TEST MOTOR, TILT CYLINDER SEAL STARTED LEAKING ON T-BAR.ROAD UNIT TO PRUDHOE TO PERFORM MAINTENANCE AND REPAIRS. JOB INCOMPLETE RAN IN HOLE TO 4968' CTMD WITH ESP MOTOR TEST TOOL, SEATING PINS SHOWN THAT TEST TOOL WAS ENGAGED INTO ESP MOTOR SHAFT BUT ROTATIONAL TATTLE TAILS WERE STILL INTACT INDICATING ESP MOTOR SHAFT PROBLEMS, WELL LEFT SHUT IN AND FREEZE PROTECTED WITH DIESEL DOWN TO TOP OF MOTOR. (( COMPLETE )) REPLACE SOV @ 817' RKB W/ DV. RAN HOLEFINDER, GOOD TEST OF DV. JOB COMPLETE • ConocoPhillips Alaska, Inc. • KRU 1 E-170L1 1E-170L1 API: 500292326460 Well Type_ PROD Angle @ TS: deg aQ SSSV Type: __ NONE _ _ Orig Com letion: 11/13/2005 Angle @ TD: 93 deg @ 15756 Annular Fluid: Last W/O: Rev Reason: FORMAT UPDATE Reference Lo 41' RKB Date: Ref Log Last U date: 12/27/2007 _ Last Tag: _ TD: i 15756 ftK B _ _ Last Ta Date: _ _ Max Hole An le: i _ _ _ 94 de 15673 Casin Strin ~ INGS _ Descrlpt lon Slze Top Bottom ND Wt_ Grade__ Thread _ SURFACE ___ 13.375 _ _ 0 5054 2312 0.00 BTC ESP tasza-as7a INTERMEDIATE 9.625 __ 0 10414 3336 0.00 - BTCM , oDasoo) CONDUCTOR 20.000 0 120 120 0.00 WELD WINDOW D-SAND 10.000 9412 9413 3275 0.00 WINDOW e-SAND 10.000 9778 9779 3332 0.00 _ Casin Strin - B-SAND LINER L1 SEAL Description Slze To Bottom ND Wt Grade Thread Lasso-soo3, SLOTTED LINER 5.500 9950 15756 15756 15.50 L-80 BTCM oD:s.,3o> Tubin Strin -TUBING Moron [soo3-so3s, Slze _ ___ 4.500 Top__ 0 Bottom ND __ _ Wt- _ Grade_ 4990 2299 12.60 L-80 Thread IBTM OD.5.130) Perforations S m u ma _ ~ , Centralizer (so3s-soar, OD:5.850) TUBING (5041-5073, I I I I I Interval ~ 10050 - 12145 ~ 12576 - 13938 ~ - - 13940 - 15657 ~ 15658 - 15701 ' _ _ _ TVD __ f 3338 - 3323 ~ 3314 - 3280 1 3280 - 3240 I 3240 - 3238 Zone WS B WS B WS B WS B Status _ __ Ft 2095 1362 - 1717 43 SPF 32 32 ~ 32 ~ 32 Date__ T~r~e 8/20/20_05 Slots 8/20/2005 Slots 8/20/2005 Slots 8/20/2005 Slots _ Comment - Alternating slotted/solid i e AI[ernating_ slotted/solidpi e Alternating slotted/solid pipe Alternatin slotted/solid i e OD:3.660) _ Gas Lift Mandrels/Valves __ __ _ _ - -T- - -- - St MD ND Man Mfr Man Type V Mfr V Type V OD Latch i Port TRO Date Run Vlv _ T Cmnt_ 1 817 807 CAMCOL KBG-2 SOV 1.0 BK-5 0.000 2000 4/7/2006 Other lu s ui .etc. - CO ' LRY _ De th TVD Type Description _ ID 41 41 HANGER _ VETCO GRAY MB222 TUBING HANGER, 4.909 MCA CONNECTOR 3.900 PACKER L7 (s7to-s7zs. 4899 2280 Pressure Sub PHOENIX DISCHARGE PRESSURE SUB 0.000 oD:s zso> SBR L1 4924 2285 ESP 4.5" x 38.5' ESP & 4.5" x 103" D&D PACKOFF/SLIPSTOP ASSEMBLY set 11/11/2005 (ON RIG 0.000 ts73o-s7as, 4974 2296 XO TTC XO w/PERF SUB 0.000 oD:s zso> 4990 2299 SEAL BAKER SEAL SECTION 0.000 5003 2301 MOTOR 418 HP KMH 12610 V / 98A MOTOR 8 PHOENIX XT-1 5037' OD 4.6" 0.000 5039 2309 Centralizer 6 FIN CENTRALIZER 1.990 5041 2309 _ TUBING PERFORATED TUBING 2-7/8" 2.441 5073 2316 SHOE ER JUNK SHOE B AK 6.750 9412 3275 _ HANGER L2 _ _ D-SAND BAKER MODEL B-1 HOOK HANGER 3.980 9710 3321 PACKER L1 B-SAND ZXP LINER TOP PACKER w/HRD PROFILE 7.500 9729 3324 XO L1 B-SAND CROSSOVER 4.950 9730 3324 SBR L1 B-SAND 190-47 CASING SEAL BORE RECEPTACLE 4.750 9749 3327 XO Bushing L1 B-SAND CROSSOVER BUSHING 3.940 9751 3327 CSG Swivel L1 B-SAND CSG SWIVEL 3.960 HANGER tsoo s szs 9759 3328 HANGER L1 B-SAND LEM ABOVE HOOK HANGER ' - EL ' 3.980 j Other Dew lu ND u) etC Type RY : . Descrl tlon ID PUP tsaot-ssso, OD:5 500) 9773 3331 _ HANGER L1 B-SAND LEM INSIDE HOOK HANGER L1 3.688 9794 3333 HANGER _ B-SAND LEM BAKER MODEL B-1 HOOK HANGER 7.000 9800 3334 XO Bushing B-SAND CROSSOVER BUSHING 5.500 9801 3334 PUP B-SAND PUP 4.950 9860 3340 CSG PKR B-SAND EXTERNAL CSG PACKER 4.950 I I 9910 3341 SEAL B-SAND LEM BAKER SEAL ASSEMBLY 3.880 _ 9950 3342 SLEEVE B-SAND BAKER 'HR' LINER SETTING SLEEVE 5.500 I General Notes Date Note ~ ~ _ _ _ 1/12/200 NOTE: MULTI-LATERAL WELL:1E-170 A2-SAND , 1E-170L1 B-SAND , tE-170L2 D-SAND I 1 1 I 1 I ~~ ~~~~~~ DATA SUBMITTAL COMPLIANCE REPORT 10/30/2007 Permit to Drill 2050750 Well Name/No. KUPARUK RIV U WSAK 1E-170L1 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-23264-60-00 MD 15756 TVD 3234 Completion Date 9/10/2005 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No DATA INFORMATION Types Electric or Other Logs Run: GR/RES, CCL, USIT Well Log Information: Log/ Electr Data Digital Dataset .T~pe Med/Frmt Number Name Ep D Asc Directional Survey ED; D Asc Directional Survey "~D D Lis 13451 nduction/Resistivity i i ~pt 13451 LIS Verification Samples No Directional Survey Yes ~.-.-- (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / Scale_ Media No Start _ Stop CH Received Comments 9777 15756 Open 10/26/2005 IIFR 9777 15756 Open 10/26/2005 MWD 5054 15718 Open 1/31/2006 ASLD/GR/EWR4/CNP/SLD /ROP/ACAUPWD/GEOPIL OT 5054 15718 Open 1/31/2006 ASLD/GR/EWR4/CNP/SLD /ROP/ACAUPWD/GEOPIL OT Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y ~N _ Daily History Received?~ Chips Received? "Y71Q1 Formation Tops ~ N Analysis `xL1Y Received? Comments: Compliance Reviewed By: __ - ---- _ Date:-- ~~_~ - ~~ - - • WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 September 10, 2007 RE: MWD Formation Evaluation Logs: 1 E-170,+PB l+PB2+PB3+L 1+L2 AK-MW-3778283 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 l E-170,+PB l+PB2+PB3+L 1+L2 Digital Log Images: 50-029-23264-00, 70, 71, 72, 60, 61 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~ ~, a ~ ': ~ -tea mss- J ~. Date: ;1C~1J(;~~~v Signed: ~ ~b5 = 6~ ~( ~ t5 G3~ c 563 t S~,3g ~56~`~ ~„~_ ~o5a~'s ~ s~~l! aoso~~ ~s~~ra 3 ~ • WELL LOG TRANSMITTAL To: State of Alaska January 10, 2006 Alaska Oil and Gas Conservation Co. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 ao5 -o~~ RE: MWD Formation Evaluation Logs 1E-170 Ll, _ AK-MW-3778283 fJ~~~ 1 LDWG formatted Disc with verification listing. API#: SO-029-23264-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY GI+ THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date:l 3.1 p Signed: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~ U ~ ~ ~, ~ 2005 WELL COMPLETION OR RECOMPLETION REPORT A`I'~`C~ ~ a $• CommssiA~t 1a. Well Status: Oil ^ Gas Plugged Abandoned ^ Suspended .WAG ^ 20AAC 25.105 20AAC 25.110 GINJ ^ WINJ ^ WDSPL ^ No. of Completions _ Other 1b. Well Class: Development Q Exploratory ^ Service ^ Stratigraphic Test ^ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Date Comp., Susp., or Aband.: September 10, 2005 12. Permit to Drill Number: 205-075 J 305-272 / 305-284 3. Address: P. O. Box 100360, Anchorage, AK 99510-0360 6. Date Spudded: ~ ~ Nbf ~;' Z(~.jfjr ~yaae-~, 2005 ~ f~'K 13. API Number: 50-029-23264-60 4a. Location of Well (Governmental Section): Surface: 247' FNL, 641' FEL, Sec. 21, T11N, R10E, UMW 7. Date TD Reached: August 21, 2005 14. Well Name and Number: 1E-170L1 - At Top Productive Horizon: 2021' FSL, 211' FWL, Sec. 27, T11 N, R10E UM 8. KB Elevation (ft): 41' RKB 15. Field/Pool(s): Kuparuk River Field Total Depth: 1320' FSL, 169' FWL, Sec. 34, T11 N, R10E, UM 9. Plug Back Depth (MD + ND): 15756' MD / 3234' ND West Sak Oil Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 549890 • y- 5959340 Zone- 4 10. Total Depth (MD + ND): ~ 15756' MD / 3234' TvD ~ 16. Property Designation: ADL 25660 TPI: x- 550815 y- 5951055 Zone- 4 Total Depth: x- 550826 y- 5945074 Zone- 4 11, Depth where SSSV set: none 17. Land Use Permit: ALK 470 18. Directional Survey: Yes ^~ No ^ 19. Water Depth, if Offshore: N/A feet MSL 20. Thickness of Permafrost: 1733' MD 21. Logs Run: ~~W d~yV f ~ 7 8• ra^ Iy!/~~ 33S a' ~~~ GR/Res, CCL, USIT f /Z•/SOS 22. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 94# H-40 41' 120' 41' 120' 42" 375 sx AS I 13.375" 68# L-80 41' 5054' 41' 2311' 16" 917 sx AS Lite, 272 sx DeepCrete 9-5/8" 40# L-80 41' 10414' 41' 3451' 12.25" 305 bbls DeepCrete 5.5" 15.5# L-80 9773' 15745' 3330' 3235' 8.5" slotted liner 23. Pertorations open to Production (MD + ND of Top and Bottom 24. TUBING RECORD Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET tubing run in main wellbore 1E-170 only slotted liner from 10062'-15713' MD 3339'-3236' TVD • 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 26. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) ESP Oil Producer -shares production with 1 E-170 and 1 E-170L2 -waiting on facility hook-up Date of Test Hours Tested Production for Test Period --> OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing press. psi Casing Pressure Calculated 24-Hour Rate -> OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY -API (corr) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips a/njd presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". 5 ` i~` ~ Ll.. ~ ~M~~. 0~G ~ ~ 2005 ~. , ~` NONE ~-'(D-=Q. ~.~~ > ~i h .« . Form 10-407 Revised 12/2003 (~ ~ ~ ~ pt , ~ ~ CONTINUED ON REVERSE e :~ •( ~. ' l ~~ ~ ~ `~.~ zs. 2s. GEOLOGIC MARKERS FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". 1 E-170L1 West Sak B 9768' 3330' Base West Sak B 12300' 3320' West Sak B 12489' 3319' Base West Sak B 15756' 3234' N/A . 30. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 31. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mike Greener @ 263-4820 Printed Na Randv Thomas Title: Greater Kuoaruk Area Drillino Team Leader ~ ~ ~~ 2 `a .~ ~ Signature `~c~.c.dL, Phone Date ~-~ ~~ ~d 3 INSTRUCTIONS Prepared by Sharon Allsup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: True vertical thickness. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other (explain). Item 27: If no cores taken, indicate "none". Item 29: List all test information. If none. state "None". Form 10-407 Revised 12/2003 • • Conocol?hillips'Alaska Page ~ of 45 Operations Summary Rep©rt Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Spud Date: 6/26/2005 End: 9/10/2005 Group: Date i Prom = To I Hours I Code ~ Code Phase 6/22/2005 03:30 - 00:00 20.50 MOVE MOB MOVE 6/23/2005 00:00 - 03:00 3.00 MOVE MOVE MOVE 03:00 - 04:00 1.00 MOVE MOVE MOVE 04:00 - 06:30 ~ 2.50 ~ MOVE ~ MOVE ~ MOVE 06:30 - 18:00 i 11.501 MOVE MOVE MOVE 18:00 - 21:30 I 3.501 MOVE I MOVE I MOVE 21:30 - 00:00 I 2.50 MOVE MOVE MOVE 6/24/2005 00:00 - 00:30 0.50 MOVE MOVE MOVE 00:30 - 05:00 4.50 MOVE MOVE MOVE 05:00 - 09:00 4.00 MOVE MOVE MOVE 09:00 - 12:00 3.00 MOVE MOVE MOVE 12:00 - 17:00 5.00 MOVE MOVE MOVE 17:00 - 19:30 2.50 MOVE MOVE MOVE 19:30 - 21:30 I 2.001 MOVE I MOVE I MOVE 21:30 - 23:00 1.50 MOVE MOVE MOVE 23:00 - 23:30 0.50 MOVE POSN MOVE 23:30 - 00:00 0.50 MOVE MOVE MOVE 6/25/2005 00:00 - 01:00 1.00 MOVE POSN MOVE 01:00 - 03:00 2.00 MOVE POSN MOVE 03:00 - 04:45 1.75 MOVE POSN MOVE 04:45 - 09:30 4.751 MOVE POSN I MOVE 09:30-10:301 1.OOIDRILL IRIRD IRIGUP 10:30 - 12:00 I 1.501 DRILL IRIRD fRIGUP 12:00 - 18:00 I 6.00 I DRILL IRIRD IRIGUP 18:00 - 23:00 I 5.001 DRILL IRIRD IRIGUP 23:00 - 00:00 I 1.00 DRILL I PULD IRIGUP Description of Operations Move Rig T/ 1 E-170 Tum Key Rig Move: Lay Malts Over all colvert crossings and plywood. Turn Key Rig Move: Rig trying to get over matted culvert crossing powered out. While Trying to work over crossing by backing up and getting run at crossing the back end of Drill unit was allowed to get to close to side of road causing road to blow out. Turn Key Rig Move: Call for Equip, to pull out of hole. Move pit module back to where equipment would have access to rear of drill module. Tum Key Rig Move: W.O. equipment, 08:30 Unload and Road equipment to drill module, Hook up cats to rear beam, Pull sub backwards out of hole unhook cats road back to reload take to FRONT FURTHER HELP. Tum Key Rig Move: Lay plywood Move rig T/KIC. Junction Inspect Rig Wait to lay mats, Move Front of K.O.C. APRS laying plywood 1E tum off build up access road with plywood. Rig Crews waiting on road crew to lay plywood and mats. Tum Key Rig Move: Move rig to 1 E access road hook up cats and help pull overUp grade Acsess. Move Pit complex over road to back of KOC. Stop Move pits and rig back of koc Wait on mats to be layed and mats to be around. Move from behind KOC to 1 E pad. Derrick Module broke through road Build up road. Back module out, Matt road all the way to 1 E pad, Move derrick module and pit Module to entrance of 1 E pad, Set mats for rig foot print Move derrick and pit modules onto 1E pad, Move pits around~derrick module, Lay more mats not a big enough foot print layed the first time. Spot pit module on malts Repair hose on pit module. Moving system. Spot Pit Module on Matts Move Sub base on Matts spot over Well. Skid Rig and spot pits.To be moved into sub. Crane called to move well house to be able to set pit module.Not reconized until sub and pits on well. Hook up servce lines that can be hooked up Set beaver slide. Move well house @ 07;00 Set pit module cunt, hooking up service line's. Set rock washer unit,Rigging up service lines, Switch to high line power. Rig Accepted By Fred Herbert @ 10:OOhr. Rig up cutting tank and berm ,Nipple Up Riser, Rizer was to short had to add 27 inches, Could of found out @ 0600 when asked, but did not check until 12;OOhrs. Continue R/U koomey lines, Make up flow lines, Turn Buckles, Start filling pits with fluid. Start loading pipe shed loaded 78jts. Herculate around riser and drip pan. Clear floor of 4"XT subs and handling equipment. Change Saver Sub on top drive,lnstall Shaker screens on shakers.Tighten bolts on riser, Change air boot on flow Iine,Tighten dresser sleeve on flow Iine.Start Building Spud mud, Load pipe shed with 180 5" D.P. 29 HWT DP 3 - 8" flex Collar 8" Motor and MWD.Function test, Koomey Test, Waived by State Man Jeff Jones. Rig Up and start picking up 5" Drill Pipe. standing back in derrick. Printed: 9/30/2005 6:19:05 AM • ConocoPhillips Alaska Page 2 of ~5 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date 'From'. - To Hours ~ Code 'Code Phase Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations 6/26/2005 00:00 - 05:30 5.50 DRILL PULD RIGUP Pick Up 5" Drill Pipe and stand in Derrick total 180 joints. 05:30 - 09:00 3,50 DRILL PULD RIGUP Pick Up 5" HWT Drill Pipe and stand in Derrick total 29 joints and set Jars. 09:00 - 10:00 1.00 DRILL PULD RIGUP Pick Up BHA Subs to rig floor, Fill Conductor and check surface equipment. 10;00 - 13:00 3.00 DRILL PULD SURFAC PJSM; Pick Up BHA, Upload MWD, Rick up slick line in derrick for Gyro. 13;00 - 13:30 0.50 DRILL TRIP SURFAC Test Mud lines 3,000psi. Tag fill @ 88', Clean out to 120'. 13:30 - 14:00 0.50 DRILL DRLG SURFAC Drilling From; 120' - 135'. 14:00 - 14:30 0.50 DRILL RGRP SURFAC Working on Power limit control to SCR's 14;30 - 16:30 2.00 RIGMNT DRLG SURFAC Drilling From; 135' - 230'. Gravel returns. 16:30 - 17:30 1.00 DRILL TRIP SURFAC Trip Out Hole; Replace with 3 flex Collars, and jars, 17:30 - 18:00 0.50 DRILL SURV SURFAC Gyro Survey @ 215' 18:00 - 00:00 6.00 DRILL DRLG SURFAC Drill and survey 16" Hole from 230' MD to 645'MD (640 ND. TST = 2.77 hrs, TRT = 2.65 hrs, TDT = 5.42 hrs. Avg. ROP = 96 fph. UP WT. 105K, DN WT. 105K, ROT Wt 100K. Tq on Btm 3K, Tq off Btm 1 K, at 50 rpm. Pump at 155 spm, 650 gpm 2,340 psi. APIG= 61.76'per Hr. Jar hrs, 128 6/27/2005 00:00 - 06:00 6.00 DRILL DRLG SURFAC Drill and Slide; survey(gyro) 16" Hole. From 645' MD. (640 ND). To 1,111 MD {1,074' tvd)AST =1.73 hrs, ART =2.62 hrs, TDT = 5.42 hrs. Avg. ROP = 85.9 fph. UP WT. 110K, DN WT. 110K, ROT Wt 115K. Tq on Btm 2K, Tq off Btm 1 K, WOB 15-30k, 60 rpm. Pump at 180 spm, 763 gpm, 3500 psi.Total Drill time 8.32. 106 ROP Average, APIG= 73.41'per Hr. Total Ft Drilled 881' 12hrs. 06:00 - 12:00 6.00 -DRILL DRLG SURFAC Drili and Slide; survey 16" Hole From 1,111' MD. (640 ND). To 1,637' MD (1,519'ND)AST =2.70 hrs, ART =1.43 hrs, ADT = 4.03hrs. Avg. ROP = 130 fph. UP WT. 130K, DN WT. 120K, ROT Wt 125K, Tq on BtmSK, Tq off Btm 3K, WOB 15-30k, 60 rpm. 553 - 763 gpm, 3500 psi.Total Drill time 12.45. 106 ROP Average, APIG= 78.16'per Hr. Total Ft Drilled 1,407' 18hrs. 12:00 - 18:00 6.00 DRILL DRLG SURFAC Drill and Slide; survey 16" Hole From 1,637'MD. (1,519' ND). To 2,253' MD (1,857'ND) AST= 2.22 hrs, ART =1.58 hrs, ADT = 3.8hrs. Avg. ROP = 162 fph. UP WT. 130K, DN WT. 120K, ROT Wt 125K. Tq on Btm 7K, Tq off Btm 4K, WOB 15-30k, 60 rpm. 553 - 763 gpm, 3500 psi. Total Drill time 16.12. ROP Average,125.4'. APIG= 84.29 'per Hr. Total Ft Drilled 2,023' 24hrs. 18:00 - 20:00 2.00 DRILL DRLG SURFAC Drill and Slide; survey 16" Hole From 2,253' MD. (1,857 ND). To 2,411' MD (1,894'ND) AST= .2 hrs, ART =1.52 hrs, ADT = 1.74hrs. Avg. ROP = 90.80 fph. UP WT. 140K, DN WT. 120K, ROT Wt 125K. Tq on Btm 7K, Tq off Btm 4K, WOB 15-30K 60 rpm. 553 - 763 gpm, 3500 psi. Total Drill time 17.36hrs .125.6 ROP Average, APIG= 83.88' per Hr. Total Ft Drilled 2,181' 26hrs. Total Jar hrs. 141.21. 20:00 - 20:30 0.50 DRILL CIRC SURFAC Circ & Condition Hole for Trip. Last Survey 76.97 incl. 173.56 Azm. 2,347 MD (ND 1,894') 20:30 - 00:00 3.50 DRILL TRIP SURFAC Trip Out Hole; Pump out hole To 900' Pull Out Of Hole. Alot of clay bound to Tool Joints and BHA. ,6/28/2005 00:00 - 02:00 2.00 DRILL TRIP SURFAC Trip Out Hole; Pump out hole To 900' Pull Out Of Hole. Alot of clay bound to Tool Joints and BHA. Clean Bit and BHA. 02:00 - 03:00 1.00 DRILL PULD SURFAC Work BHA; Change bend in Motor from 1.83deg to 1.15deg. Lay Down Pony Collar and drop press drop sub, Orientate tools. 03:00 - 04:30 1.50 DRILL TRIP SURFAC Change pulsar valve and attemt to grease valve, Tool Failure, Low Amp hours on Battery, Down load MWD, Pick up new pulsar valve. 04:30 - 05:00 0.50 DRILL TRIP SURFAC Re- Orientate Upload MWD. Welding on 4" outlets on Conducter, Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska' Page 3 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date. From - To Hours ~ Code ..Code 'Phase 6/28/2005 104:30 - 05:00 I 0.501 DRILL I TRIP I SURFAC 05:00 - 06:00 1.00 RIGMNT RSRV SURFAC 06:00 - 10:00 4.00 RIGMNT OTHR SURFAC 10:00 - 10:30 0.50 DRILL TRIP SURFAC 10:30 - 11:00 0.50 DRILL CIRC SURFAC 11:00 - 11:45 0.75 DRILL TRIP SURFAC 11:45 - 12:15 0.50 DRILL CIRC SURFAC 12:15 - 12:30 0.25 DRILL TRIP SURFAC 12:30 - 12:45 0.25 DRILL REAM SURFAC 12:45 - 18:00 5.25 DRILL DRLG SURFAC 18:00 - 00:00 6.00 I DRILL I DRLG SURFAC 16/29/2005 100:00 - 06:00 I 6.00 I DRILL I DRLG SURFAC 06:00 - 12:00 I 6.00 I DRILL I DRLG SURFAC 12:00 - 18:00 I 6.00 I DRILL I DRLG SURFAC 18:00 - 22:30 I 4.501 DRILL I DRLG I SURFAC 22:30 - 23:00 0.50 DRILL CIRC SURFAC 23:00 - 00:00 1.00 DRILL TRIP SURFAC 6/30/2005 00:00 - 05:00 5.00 DRILL REAM SURFAC Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 ~ Description of Operations Working with Surface mud, Clean Rock Washer tank torn screens allowed alot of solids in tank. Rig Service ,Grease Crown ,Inspect Drill line. Welding 4" outlets on conductor, Finish up cleaning out rock washer and run fluid back over screens Ship to 1r pad. Trip in Hole; Finish Picking up upper Bha. Trip in hole to 1,116' Circ and Condition @ 400 gpm 870psi. 200bb1s. High Vis Mud returns. Trip in Hole to 2,064' MD, UP WT. 115k DN WT 110k. Break Circulation, Condition Mud, @400gpm 1050psi. High Vis. Mud Returns. Trip in Hole to 2,360 MD Wash 51' to 2,411' @ 600 gpm, 80 RPM, Drill and Slide; survey 16" Hole From 2,411' MD. (1,894' ND). To 2,916" MD (1,980'ND) AST= :72 hrs, ART-=2.11 hrs, ADT= 2.83hrs. Avg. ROP = 177.8 fph. UP WT. 130K, DN WT. 110K, ROT Wt920K. Tq on Btm 7K, Tq off Btm 5K, WOB 15-30K 120 rpm.600-800 gpm,2300 psi. Total Drill time 21.01 hrs .133.63 ROP Average, APIG= 85' per Hr. Total Ft Drilled- 2686', 31.25hrs. Drill and Slide; survey 16" Hole From 2,916' MD. (1,980' ND). To 3,549' MD (2,029' ND) AST= .82 hrs, ART =3.31 hrs, ADT = 4.13hrs. Avg. ROP = 153 fph. UP WT. 130K, DN WT. 90K, ROT Wt 110K. Tq on Btm 9-10kK, Tq off Btm6K, WOB 15-30K 120 rpm.800-900 gpm,2,590 psi. Total Drill time 25.14 hrs .136 ROP Average, APIG= 89' per Hr. Total Ft Drilled-3,319', 37.25 hrs. Drill and Slide; survey 16" Hole From 3,549' MD. (2,029' ND). To 3,875' MD (2,064' ND) AST= 2.00 hrs, ART =2.56 hrs, ADT = 4.56hrs. Avg. ROP = 72 fph. UP WT. 130K, DN WT. 95K, ROT Wt 110K. Tq on Btm 9-10K, Tq off Btm 6K, WOB 15-20K 120 rpm.900 gpm,2,950 psi. Total Drill time 32.26 hrs 116ROP Average, APIG= 79 'per Hr. Total Ft Drilled-3755', 53.25 hrs. Drill and Slide; survey 16" Hole From 3,875' MD. (2064' ND). T/ 4,340' MD (2,140' ND) AST= 2.80 hrs, ART =2 hrs, ADT = 4.80hrs. Avg. ROP = 97 fph. UP WT. 140K, DN WT. 90K, ROT Wt 110K. Tq on Btm 11K, Tq off Btm 9K, WOB 15K 120 rpm.900 gpm,2,850 psi. Total Drill time37.06 hrs 113ROP Average, APIG= 71 'per Hr. Total Ft Drilled4220', 59.25 hrs. Drill and Slide; survey 16" Hole From 4,340' MD. (2140' ND). T/ 4,733' MD (2,245' ND) AST= 3.13 hrs, ART =.89 hrs, ADT = 4.02hrs. Avg. ROP = 97 fph. UP WT. 160K, DN WT. 80K, ROT Wt 115K. Tq on Btm 14K, Tq off Btm 11K, WOB 15K 120 rpm. 750 gpm,2240 psi. Total Drill time 41.08 hrs 112ROP Average, APIG= 70' per. Hr. Total Ft Drilled4,613', 65.25 hrs. Drill and Slide; survey 16" Hole From 4,733' MD. (2245' ND). T! 5,090' TD (2319 ND) AST= 1.45 hrs, ART =1.46 hrs, ADT =2.91 hrs. Avg. ROP = 122 fph. UP WT. 170K, DN WT. 75K, ROT Wt 115K. Tq on Btm 14K, Tq off Btm 11 K, WOB 15K 120 rpm. 900 gpm,3300 psi. Total Drill time 43.99 hrs 112 ROP Average, APIG= 71 'per Hr. Total Ft Drilled4,970', 69.75 hrs. Circulate and pump 11 ppg density sweep 60bbls. Trip Out Hole; Back Ream Out Hole 800 GPM 120 RPM Pull @ 35 Ft per Min. Trip Out Hole; Back Ream Out Hole 800 GPM 120 RPM Pull @ 35 Ft per Min. Attempt to pull pipe (over pull 20k,) Cont. Back Reaming to Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips'A1aska Page 4 of 45 Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Date From.'- To V2005 00:00 - 05:00 5:00 - 08:30 17/1 /2005 7/2/2005 1 E-170 1 E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Hours ~ Code Code .Phase 5:00 DRILL REAM SURFAC 3.50 DRILL REAM SURFAC 08:30 - 09:30 1.00 DRILL CIRC SURFAC 09:30 - 18:00 8.50 DRILL REAM SURFAC 18:00 - 19:45 ~ 1.75 ~ DRILL I REAM I SURFAC 19:45 - 21:00 I 1.251 DRILL I TRIP I SURFAC 21:00 - 21:30 0.50 DRILL PULD SURFAC 21:30 - 22:00 0.50 DRILL PULD SURFAC 22:00 - 22:30 0.50 DRILL PULD SURFAC 22:30 - 23:00 0.50 DRILL PULD SURFAC 23:00 - 00:00 1.00 CASE SFTY SURFAC 00:00 - 01:15 1.25 CASE RURD SURFAC 01:15 - 02:00 0.75 CASE RURD SURFAC 02:00 - 04:00 2.00 CASE RUNC SURFAC 04:00 - 05:15 1.251 CASE I OTHR SURFAC 05:15 - 06:00 I 0.751 CASE RUNC I SURFAC 06:00 - 07:30 07:30 - 10:00 10:00 - 10:45 10:45 - 12:15 12:15 - 14:45 14:45 - 16:00 16:00 - 16:15 16:15 - 17:30 17:30 - 18:30 18:30 - 19:00 19:00 - 20:00 20:00 - 00:00 00:00 - 02:00 1.50 CASE CIRC SURFAC 2.50 CASE RUNC SURFAC 0.75 CASE CIRC SURFAC 1.50 CASE RUNC SURFAC 2.50 CASE CIRC SURFAC 1.25 CASE RUNG SURFAC 0.25 CASE RURD SURFAC 1.25 CASE OTHR SURFAC 1.00 CASE OTHR SURFAC 0.50 CASE RUNC SURFAC 1.00 CASE RURD SURFAC 4.00 CASE CIRC SURFAC 2.001 CEMENlf CIRC I SURFAC Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group:. Rig Number: 15 Description'of Operations 1,300' Shakers Clean, Pull 2 stands. Pulled free. T/ 1,160'. Trip Back in Hole, Plotting Torq and Drag, Tight Spot @ 4,061' to 4,221' MD. Pumped one jt. down was able to work Dn to 4,221' Up WT. 150k- DN WT.70k After 4,221' Dn wt increased T/ 75-78k Run in To 5,050 Circulated 11 ppg. weighted sweep @ 940 GPM, W/ 3,670 PSI and 150 RPM, out of drill pipe. Trip Out Hole; Backreaming Pumping @ 940 GPM W/ 3600 PSI and 150 RPM, F/ 5090' T/ 1397' MD Trip Out Hole; Cont. back reaming @ Step Down Rate supplied by MWD to circ, with out causing damage Pular Valve 700,600,500,400, 300 GPM and 100 RPM, F/ 1,397' (tvd 1,273' 30.22incl.) T/ 670' (Tvd 660' ). Shakers Cleaned Up pulling slow to 670' Trip Out Hole; Handling BHA, Stand back HWT-Jar, One stand of Flex DC. Trip Out Hole; UD BHA, Stab, Float Sub, Ubho Sub to-MWD. MWD; Service Pulser valve and UD same. Trip Out Hole; Flush Motor, Drain same, Break bit and grade, UD Motor Clean and clear floor of BHA. PJSM, on running casing, R/U casing equipment. PJSM, on running casing, R/U casing equipment. M/U hanger and Landing Jt. Make dummy run with Vetco/Gray hanger. P/U & M/U franks fillup tool. P/U and run Shoe2- jts Float 1- Jt fill each test Floats. Run 13 3/8 68# L-80 BTC. 893'. Wieght stacked out on ledge work pipe. From 893' hang collar on conductor 863'. Circulate @ 230 gpm 100psi. Work pipe hitting hard no gain Turn pipe and work down. Run in Hole W/ 13 3/8 Csg. 68# L-80,BTC.F/ 893' T/ 1,533', Fill every Jt. UP WT. 155k, DN WT. 130k. Circulate; Work 2-Jts Down @ 300 bbls. 5.5 bpm 340 psi. UP WT. 168k, DN WT. 140k. Run in Hole W/ 13 3/8 Csg: 68# L-80,BTC. F! 1,645, T! 3,100' Fill every Jt. UP WT. 225k, DN WT. 140k. Circulate; Work Pipe pump 273 bbls. 6.5 bpm 440 psi. UP WT.225k, DN WT. 140k. Run in Hole W/ 13 3/8 Csg. 68# L-80,BTC. F/ 3100, T/ 4500' Fill every Jt. UP WT. 280k, DN WT. 125k. Circulate; Work Pipe pump 638 bbls. 6.2 bpm 450 psi. UP WT.260k, DN WT. 130k. Run in Hole W/ 13 3/8 Csg. 68# L-80,BTC. F/ 4,500 T/ 5,032' Fill every Jt. UP WT. 335k, DN WT. 115k. Install Centalizer. M/U Hanger and Landing Jt. Centralizer 17 1/8 would not go through landing ring 17" (shoe @ 5,035'}. UD Hanger Jt. P/U to the centralizer on jt # 121. Circulate and Condition; While Grinding Centralizer down to 16 3/4" OD. ` M/U Hanger and Landing Jt. and land hanger @ 5,079'. UD Franks Circulating tool and Install Cement Head. Circulate and Condition Mud for Cmt Job. Before Treatment PV 23, YP 33, Gels 10/10/30= 21/49/75, 9.6ppg. MW, F.V. 92. After Treatment PV 18, YP 18, Gels 10/10/30min 10115125, 9.6ppg. F.V. 60. Circulate and Condition Mud for Cmt Job. Before Treatment PV 23, YP 33, Gels 10/10/30= 21/49/75, 9.6ppg. MW, F,V. 92. After Treatment PV Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 5 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 .End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours Code ~ Code .Phase 7/2/2005 00:00 - 02:00 2.00 CEMEN CIRC SURFAC 02:00 - 05:00 3.00 CEMEN PUMP SURFAC 05:00 - 07:00 2.00 CEMEN DISP SURFAC 07:00 - 09:00 2.00 CASE OTHR SURFAC 09:00 - 12:45 3.75 CASE OTHR SURFAC 12:45 - 16:45 4.00 CASE OTHR SURFAC 16:45 - 20:00 3.25 CASE OTHR SURFAC 20:00 - 23:00 3.00 CASE OTHR SURFAC 23:00 - 00`00 1.00 RIGMNT RSRV SURFAC 7/3/2005 00:00 - 03:00 3.00 RIGMNT RSRV SURFAC 03:00 - 04:30 1.50 RIGMNT RSRV SURFAC 04:30 - 06:30 2.00 RIGMNT RGRP SURFAC 06:30 - 08:30 2.00 WELCT OTHR SURFAC 08:30 - 10:30 2.00 WELCT OTHR SURFAC 10:30 - 16:30 6.00 WELCT NUND SURFAC 16:30 - 20:30 4.00 WELCT BOPE SURFAC 20:30 - 00:00 3.50 WELCT BOPE SURFAC 7/4/2005 00:00 - 01:00 1.00 WELCT ROPE SURFAC Description of Operations. 18, YP 18, Gels 10/10/30min 10/15/25, 9.6ppg. F.V. 60. Pump 10,bb1's CW 100, Test Line to 3,500 psi, Pump 40 bbl's CW 100, 50 bbl's mudpush@ 10.5 ppg W/red dye/ Shutdown and drop BTM plug, Pump 734 bbl's lead cement 10.7 ppg Silo's class ASL yield 4.49 FT3/SK Mix 21.150 Gal/Sk Porosity 62.9% Solid Fraction 37.1 % Slurry type tail cement 12.0 ppg Deep Crete Yield 2.47 FT3/SK Mix Fluid 8.231 GAUSK Porosity 44.5% Solid Fraction 55.5% Recriprocating casing could not get back down to hanger. Casing stuck pulled 420K up casing broke free. Up Wt after free 330 K. Could not work back down came up free stopped 24' above hanger. Drop top plug chase with 20 bbl's water Start displacement at 7 bpm - 260 PSI with rig pumps. Diverted to cellar with contaminated mud at 4,352 strokes. Slowed pump rate down to 3 bpm at 5,405strks. To handle returns @ surface. Staged pump rate back up to 5.5 bpm by 5,941 strokes. At 6,200 strokes good cement to surface / 7,050 Strokes pump rate decreased to 3 BPM. 790 psi. Plug bumped at 7,185 strokes W/500 psi over. Total psi 1,300 // CIP @ 06:46 With 98 bbl's good cement returned to surface. 06:52 checked floats. O.K. C.I.P. Rig Down and Wash. Pump Retarder pill through stack and surface lines and stack Function and wash out hydril. Nipple down Diverter, Flow lines and turn buckles. Pull Riser and hydril, Cut 4" lines off conductor. Back out lock downs. P/U hydril To set Emergency slips. Center 13 3/8" Csg. Set Slips 330,000#70,000 Block WT. = 260k on slips. Cut Hole in 13 3/8" Csg. Drain, R/D Cement head Do Ruff Cut on csg. UD landing jt, Hanger and cut off piece 13 3/8". N/D diverter, Hydril, and 16" riser, Remove Vetco grey head Had trouble removing wellhead (skirt). Welder working on well head doing final cut, Lay Down all csg Tools, Change out bails, Cleaning Rock washer and pits. Change Oil & Filters in Top Drive, Sevice Rig. Heating and welding on well head. Change Oil & Filters in Top Drive, Sevice Rig. Heating and welding on well head. Wrap well head. Let cool 00;45. Cut and slip drill line 110'. Inspect brakes, Work on Top Drive. Could not P/U Drill Pipe. Clean Rig Floor, Well head cooling, Making up LSDN mud. Clean Rig Floor, Well head cooling, Making up LSDN mud: Test Weld Transition to casing 80% Collapse 1,800psi.Test Well head to 5,000psi. F/15min. M/U csg. head and test 5,000psi. F/15min. Nipple up BOP's need to cut down 20" flow nipple. Still Working on Top Drive. Test BOPE per AOGCC Regs, Approved Drilling Permit, .Test pressures were 250 psi and 3,000 psi. test lower tree seal 250,5,000psi.All test pressures held for 5 min and charted on test recorder. Waived By AOGCC Chuck Scheve, Drilling Supervisor ,and DDI Tourpusher witnessed BOPE test. # 10 Choke Manifold Valve Failed. Will replace before drilling out shoe Notified State Repersenative of plan O.K. By Chuck Scheve. Nipple up and test. Time Exceeded 10hrs Contract time allowed. Continue Testing BOP Equipment. Test BOPE per AOGCC Regs, Approved Drilling Permit, .Test Printed: 9/30!2005 6:19:05 AM • • Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To ConocoPhillips Alaska Page 6'`of 45 Operations Summary. Report''' 1 E-170 1 E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 1 Hours ~ Code Code Phase 7/4/2005 100:00-01:00 I 1.OOIWELCTUBOPE ISURFAC 01:00 - 02:00 1.00 WELCT OTHR SURFAC 02:00 - 06:00 4.00 DRILL PULD SURFAC 06:00 - 12:00 I 6.001 DRILL I TRIP ISURFAC 17/5/2005 12:00 - 13`45 1.75 DRILL CIRC .SURFAC 13:45 - 16:00 2.25 DRILL DEOT SURFAC 16:00 - 18:00 2.00 CEMEN DSHO SURFAC 18:00- 19:15 I 1.251 DRILL (CIRC ISURFAC 19:15 - 21:15 2.00 DRILL CIRC SURFAC 21:15 - 21:30 0.25 DRILL CIRC SURFAC 21:30 - 23:00 1.50 DRILL FIT SURFAC 23:00 - 23:15 0.25 DRILL OTHR INTRM1 23:15 - 00:00 0.75 DRILL DRLG INTRMI 00:00 - 03:45 3.75 DRILL TRIP INTRM1 03:45 - 04:00 0.25 DRILL TRIP INTRM1 04:00 - 06:00 2.00 DRILL DRLG INTRM1 06:00 - 08:00 ( 2.001 DRILL DRLG I INTRM1 08:00 - 08:45 I 0.751 DRILL (CIRC I INTRM1 08:45 - 12:00 ~ 3.25 ~ DRILL ~ DRLG ~ INTRM1 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations pressures were 250 psi and 3,000 psi. test lower tree seal 250,5,000psi.All test pressures held for 5 min and charted on test recorder. Waived By AOGCC Chuck Scheve, Drilling Supervisor ,and DDI Tourpusher witnessed BOPE test. # 10 Choke Manifold Valve Failed. Will replace before drilling out shoe Notified State Repersenative of plan O.K. By Chuck Scheve. Time Exceeded 10hrs Allowed to Nipple up and test BHA. Contractors Charge. L/D Test Equipment, Set Wear Ring I.D. OF wear ring 12.312. Move 5" HWT. in Derrick and Change Out Jars. P/U GEO Pilot and Bit. P/U MWD and Upload. P/U BHA. Trip In Hole P/U 5" Drill Pipe, Install Ghost Reamer #1 on jt. # 11, Run 28 more Install Ghost Reamer#2, Run in hole P/U Drill Pipe. Shallow test Geo Tools and MWD @ 700gpm 1,380psi. RiH P/U singles T/ 4,925' Up Wt 155k - DN WT. 70K. Top Drive wieght is 70K Circulate and Condition for Casing Test. Test Casing T/ 3,000psi. Chart and plot. F/30min. Drill Float Equipment and shoe, Float @ 4,967', Shoe @ 5>054 Drilling F/ 5,090'MD New Hole 650GPM 1500 psi. 80 Rpm ART=.14 Pull back up into shoe and circulate while spotting trucks for mud swap over operation Displace well to 9.1 ppg LSND new mud @ 6.5 BPM W/ 280 PSI max. due to cuttings auger. Preform Base Line for PWD with new mud and record SPRs R/U and perform FIT, open hole MD= 5110' TVD= 2323' ,Casing shoe @ 5054' MD/ 2311' TVD, LOT @ 430 psi =EMW= 12.7ppg w/ New Mud wt=9.1 ppg Attemp to down link command to Geo Pilot with 720 GPM, losing mud over shakers. Changed jet bn skid to size 22 Drill F/ 5110' T/ 5181' ART= .87 TVD= 2326' Pull out of hole f/ 5181' to 13 3/8" casing shoe @ 5054'. Change out jet in Geo pilot skid. Change out shaker screens on shakers. Attempt to work Geo pilot. Change out jet on Geo Pilot skid. Attempting to pump 400 gpm. Shakers running over. Change out all shaker screens to one 'shaker (set of 4 screens) all 80 mesh, other two shakers to 50 mesh screens. RIH Trip in hole f/ 5084' to 5181 Directional drill 12 1/4" hole f/ 5181' to 5568' (2410' TVD) (387') ART 1.96 hrs w/ Sperry Sun geo pilot, 10-25 WOB, 150 rpm's, 600-900 gpm, 9.1 ppg mw, on bottom pressure 1040-1300 psi, off bottom pressure 980-1500 psi, on bottom toque 10-20k ft/Ib, off bottom torque 8-10k ft/Ib, PU wt 145-150k, SO wt 90-100k, Rot wt 118-120k. Directional drill 12 1/4" hole f/ 5568' to 5780' {2441' TVD) (212') ART 1.48 hrs w/ Sperry Sun geo pilot, 10-15 WOB, 150 rpm's, 900-855 gpm, 9.1 ppg mw, on bottom pressure 1300-1770 psi, off bottom pressure 1500-1750 psi, on bottom toque 10-15k ft/Ib, off bottom torque 7-9k ft/Ib, PU wt 140k, SO wt 100k, Rot wt 115k. PU off bottom, circ @ reduced rate (440 gpm) while change out shaker screens to finer size. Directional drill 12 1/4" hole f/ 5780' to 5998' (2478' TVD) (218') ART 2.16 hrs w/ Sperry Sun geo pilot, 10-20 WOB, 150 rpm's, 865-938 gpm, 9.1 ppg mw, on bottom pressure 1770-1920 psi, off bottom pressure 1750-1890 psi, on bottom toque 10-12k ft/Ib, off bottom torque 7-10k ft/Ib, PU wt 145k, SO wt 95k, Rot wt 120k. Hard stringers between Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska' Page 7 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date 7/5/2005 From - To Hours 4 08:45 - 12:00 12:00 - 18:00 ode Code Phase' 3.25 DRILL DRLG INTRM1 6.00 DRILL DRLG INTRM1 18:00 - 00:00 I 6.00 DRILL DRLG INTRM1 17/6/2005 i 00:00 - 08:45 8.751 DRILL DRLG I INTRM1 08:45- 12:00 I 3.251 DRILL I REAM I INTRM1 12:00 - 14:00 I 2.001 DRILL I OTHR I INTRM1 14:00 - 14:45 i 0.751 DRILL (REAM INTRM1 14:45 - 16:45 I 2.001 DRILL (TRIP I INTRM1 16:45 - 18:00 I 1.251 DRILL I OTHR I INTRM1 18:00 - 20:30 2.501 DRILL OTHR INTRM1 20:30 - 00:00 ! 3.501 DRILL I OTHR I INTRM1 17/7/2005 100:00 - 11:00 I 11.001 DRILL I OTHR I INTRM1 11:00 - 11:15 0.25 FISH SFTY INTRMI 11:15- 13:15 2.00 FISH RURD INTRM1 13:15 - 14:00 i 0.751 FISH I ELIN I INTRM1 14:00 -15:00 1.00 FISH ELIN INTRM1 15:00 - 17:00 2.00 FISH OTHR INTRM1 17:00 - 18:30 I 1.501 FISH I ELIN I INTRM1 Description of Operations 5900' and 6998'. Directional drill 12 1/4" hole f/ 5998' to 6736'(2635' TVD) (740') ART 3.51 hrs w/ Speny Sun geo pilot, 10-20 WOB, 150 rpm's, 855-942 gpm, 9-9.1 ppg mw, on bottom pressure 1690-2200 psi, off bottom pressure 1650-2190 psi, on bottom toque 10-13k ft/Ib, off bottom torque 7-11 k ft/Ib, PU wt 140-170k, SO wt 100-88k, Rot wt 115-125k. Directional drill 12 1/4" hole f/ 6736' to 7681' (2867' TVD) (945') ART 3.39 hrs w/ Sperry Sun geo pilot, 15-20 WOB, 150 rpm's, 900-933 gpm, 9-9.1 ppg mw, on bottom pressure 2110-2350 psi, off bottom pressure 2100-2310 psi, on bottom toque 10-13k ft/Ib, off bottom torque 8-12k ft/Ib, PU wt 170-172k, SO wt 95-90k, Rot wt 125-127k. Directionally drilled 12 1/4" hole with Geo-pilot f/ 7681' to 9,108' MD/ 3,225' TVD, (1,427') ART 4.29 hrs, 10-20 WOB, 90- 150 rpm's, circ at between 576 at 1,850 psi, to 930 gpm at 2,370 psi, , on bottom torque 13-17k ft-Ibs, off bottom torque 10-14k ft/Ib, PU wt 180k, SO wt 100k, Rot wt 130k, 9-9.1 ppg mw, ave ECD 10.1 ppg, while backreaming up to make conn at 9,068' hole packed off and lost returns Backreamed out of hole slowly while rotating and attempting to regain circ, backreamed out from 9,108' to 8,803' at 150 rpm's and 23K ft-Ibs torque and was unable to regain circ Attempted to regain circ while rotating pipe at 8,803' at 150 rpm's with no success, PU to 300K on DP slacking off to block wt of 70K with no upward movement Reamed down from 8,803' to 9,016' at 150 rpm's while attempting to circ and would pump mud away with no returns POOH f/ 9016' to 8824', PU wt 250-270k ,ream up f/ 8824' to 8774' (tight @ 8774'). While attempting to est circ, pipe rotation stopped, pulled 430K on DP and worked DP up from 9,016' to 8,712', still unable to rotate or circ Attempted to pull pipe free, began PU to 500K on DP while maintaining 900 psi on DP, hydrauliced and moved pipe up hole 24' from 8,712' to 8,688' and pipe stopped Cont to work pipe up while attempting to circ, working pipe up to 500K and down to block wt of 70K, attempting to rotate pipe and circ with no success, called out Baker fishing hand along with Schlumberger wireline, cont. to work pipe while waiting on Schlumberger Cont to work pipe up while attempting to circ, working pipe up to 500K and down to block wt of 70K, attempting to rotate pipe and circ with no success while W.O. Schlumberger (SWS) E-line Held PJSM with SWS and rig crew on RU of E-line RU SWS wireline scheaves and lubricator, MU 1.56" pert gun on 1 11/16" tool string, tool length 16.1' RIH with 1.56" pert gun with CCL on E-line to 2,200' with no pump, attempted to pump down tool from 2,200' and was only able to get to 2,400', staged pump rate up from 1/2 bpm to 4 bpm at 1,080 psi and was unable to get tool deeper POOH and LD perf gun Changed out E-line from .39" to .23" line and added 3- 2" pieces (4' total) of roller stem to tool string, overall tool length 17.9' RIH with 1.56" perf gun with CCL on E-line to 2,200' with no pump, attempted to pump down tool from 2,200' and was only able to get to 2,500', staged pump rate up to 3 bpm at 960 psi and was unable to get tool deeper Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips'Alaska Page s of 45 Operations Summary Repart Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date. 'From - To Hours Code i Code Phase 7/7/2005 18:30 - 19:45 1.25 FISH ELIN INTRM1 19:45 - 21:30 1.75 FISH ELIN INTRM1 21:30 - 23:00 I 1.501 FISH I ELIN INTRM1 23:00 - 00:00 I 1.001 FISH I ELIN I INTRM1 00:00 - 01:30 1.50 FISH ELIN INTRM1 01:30 - 09:30 8.00 WAITON EQIP INTRM1 09:30 - 12:30 3.00 WAITON EQIP INTRM1 12:30 - 13:30 1.00 FISH FISH INTRM1 13:30 - 16:15 2.75 RIGMNT RSRV INTRM1 16:15 - 17:15 1.00 FISH JAR INTRM1 17:15 - 00:00 6.75 WAITON EQIP INTRM1 17/9/2005 00:00 - 00:30 0.50 FISH SFTY INTRM1 00:30 - 04:30 4.00 FISH ELIN INTRM1 04:30 - 06:15 I 1.751 FISH I ELIN I INTRM1 06:15 - 07:15 1.00 FISH ELIN INTRM1 07:15 - 08:15 1.00 FISH RURD INTRM1 08:15 - 09:15 1.00 FISH OTHR INTRM1 09:15 - 10:30 I 1.251 FISH I ELIN I INTRM1 10:30 - 11:15 I 0.751 FISH I RURD I INTRM1 11:15 - 12:20 1.08 FISH ELIN INTRM1 12:20 - 14:15 1.92 FISH ELIN INTRM1 14:15 - 15:30 I 1.251 FISH I ELIN I INTRM1 15:30 - 16:45 I 1.251 FISH I ELIN I INTRM1 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations POOH and LD perf gun MU perf string with roller stem and MU 5" OD x 1/4" thick piece of DP rubber wiper plug on btm of perf string to aid in pumping tool down RIH with 1.56" perf gun pumping tool down, staged pump rate up from 1 bpm at 870 psi to 4 bpm at 1,050 psi, was only able to get tool down to 2,200', appears to be pumping mud past tool string POOH and LD perf gun, saw no wear on wiper plug, Note: while attempting to pump tool down hole on the 3 runs we pumped a total of 216 bbls away RD Schlumberger wireline and scheaves Waited on coiled tbg unit and crane, repositioned HWDP in derrick for coiled tbg and performed derrick inspection, tightening bolts on top drive rails, decision was made at 09:30 not to run coil tbg and re-run E-line, crane and coiled tbg unifon locatiortat 06:30 hrs Called out SWS, prep rig for wireline while W.O. SWS, called out WeIlTech tractor tool and equipment also Performed blind back off on top jt and changed out same due to egged spot on tube Changed out 4 1/2" IF saver sub on top drive, inspected and serviced top drive and greased blocks Jarred on fish at 8,688' with no movement, PU to 500K working jars Waited on E-line unit with tractor tool, SWS and Well Tech worked on hooking tractor tool electronics to E-line unit at KIC, E-line unit arcived location at 23:45 hrs Held PJSM with SWS, Welltec and rig crew on RU of wireline tools RU SWS scheaves, grease injector head and control line, 2-5" pupjts with safety valve, MU 1.56" x 5' perf gun with 30 shots on 1 11 /16" tool string with 2 pieces of roller stem (3' long) along with SWS SCUD tool used to assist in pumping down tools RIH with 1.56"perf gun to 2,320' without pumping, began staging pump rate up from 1/2 bpm to 4 bpm at 970 psi while working tool string down to 2,952', took 30 min to work tool last 12', pumped a total of 217 bbls of 9.0 ppg mud while attempting to pump tool down POOH w/ wireline. Deepest could get was 2952'. Held PJSM. Rig down Schlumberger lubricator, hoses f/grease tube, sheaves, and drill pipe pupjts. PU on string to 225k. Set slips w/ 225k on slips. Rig up Schlumberger sheaves, TIW valve, and grease head for tractor run w/ perf guns. Waiting on Schlumberger tools (40' gun spacer-(2) 20' jts- blank gun stock w/ TCP connection on top). PU Schlumberger wireline gun and Weltech tractor assembly. MU pump in head and packoff. Tool string consisted of 1-11/16" wireline head, 1-11/16" Swivel, 2-1/8" Weltech tractor, 1-11/16" CCL, 1-11/16" Addressable tractor protection switch, 1-11/16" Firing head, 1.56" Gun (High Shot Density (HSD powerjet) 60 deg phase/360 deg, 6 shots per ft): Total tool string length 31.7'. RIH w/ Schlumberger wireline tools to 2202' using gravity. Start using Welltec tractor to get 31.7' tool string (5' perf guns) in hole f/ 2202' to 6500'. Running 40'/min. Continue Welltec tractor, RIH f/ 6500' to tie in CCL w/ 2nd ghost reamer in hole @ 7882.39'. Continue Welltec tractor, RIH f/ 7882' to 8300' Printed: 9(30/2005 6:19:05 AM ConocoPhillips Alaska Operations SummaryReport Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From'- To Hours Cade 'Code Phase 7/9/2005 16:45 - 17:00 0.25 FISH ELIN INTRM1 17:00 - 18:15 I 1.251 FISH 1 ELIN I INTRM1 18:15 - 19:30 1.25 FISH ELIN INTRM1 19:30 - 20:45 1.25 FISH ELIN INTRM1 20:45 - 21:00 0.25 FISH SFTY INTRM1 21:00 - 21:30 0.50 FISH ELIN INTRM1 21:30 - 00:00 2.50 FISH ELIN INTRM1 7/10/2005 00:00 - 01:00 1.00 FISH ELIN INTRM1 01:00 - 02:45 1.751 FISH ELIN INTRM1 02:45 - 06:00 I 3.251 FISH I ELIN I INTRM1 06:00 - 06:45 I 0.751 FISH I ELIN I INTRM1 06:45 - 07:45 1.00 FISH ELIN INTRM1 07:45 - 09:42 1.95 FISH ELIN INTRM1 09:42 - 09:45 0.05 FISH ELIN INTRM1 09:45 - 09:50 0.08 FISH ELIN INTRM1 09:50 - 10:45 0.92 FISH ELIN INTRM1 10:45 - 11:30 I 0.751 FISH ELIN ~ INTRM1 11:30 - 11:45 ! 0.251 FISH 1 CIRC I INTRM1 11:45 - 14:30 I 2.751 FISH I CIRC I INTRM1 14:30 - 14:45 0.25 FISH CIRC INTRMI 14:45 - 15:15 0.50 FISH CIRC INTRM1 15:15 - 16:15 1.00 FISH CIRC INTRMI 16:15 - 17:45 1.50 FISH CIRC INTRM1 Page 9'of 45 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 .Description of Operations Continue to RIH w/ tool string f/ 8300' to CCL depth of 8376.5'. This places top shot @ 8381'- bottom shot @ 8386'. (This is 3'-4' away f/ bottom tool joint upset and 3'-4' f/middle upset bottom, on first 5" HWDP above Daily/Weatherford jars). Another way to put this is: 5.36' above box on jars is bottom shot placement. Tooljoint is 2.3' long. Attempt to fire Schlumberger guns @ 8381'- 8386' in jt of 5"HWDP above jars. Could not fire guns. Confirm w/gun manufacter on rig up, running w/ tractor. Toolstring needs another piece. Note: 4 bbls fluid lost in last 12 hours to the hole. POOH w/ Schlumberger WL and Welltec tractor f/ 8376' to surface. UD Schlumberger toolstring. Reconfigure toolstring w/ xtra switch. PJSM on picking up wireline tools. PU tool string, RIH 200' MU grease head and control lines. RIH w/ Schlumberger WL and Welltec tractor w/ 5' pert gun at 4000' Continue RIH w/ Schlumberger WL and Welltec tractor w/ 5' pert gun aY f/ 4000' to 6233'. Generator supporting Weltech tractor drive, failed. Change out generator. Continue RIH w/ Schlumberger WL and Weltech tractor w/ 5' pert gun at f/ 4000' to 7882'. Second ghost reamer @ 7882'. Continue RIH w/SWS WL and Welltec tractor f/ 7882': Tie in w/ CCL with second ghost reamer @ 7882' PU wt 1550 pounds while pulling @ 50'/ min Continue RIH w/SWS WL and Welltec tractor f/ 7950'-8250' (First HWDP @ 8237'). Continue RIH w/ SWS WL and Welltec tractor f/ 8250' to CCl on depth @ 8372.3' (top shot @ 8381', bottom shot @ 8386'. SWS fire guns w/ 1120 pounds line tension, lost 20-25 pounds line tension once guns were activated. POOH w/ SWS wireline. Log ghost reamer on way out. 7882'-7888' WLM. On depth. Continue POOH w/ wireline f/ 7882' to 200' @ 150'/min. Wireline size .32": wireline displacement 185#/ft/1000' @ 8300'= .5 bbls= 31' inside dp. R/D SWS packoff, finish POOH w/ wireline tools, UD tools. leave equipment on floor. All shots fired. MU top drive. Pump @ 1 bpm 800/810 psi. 6 bbls to fill and/or pump away. Pump total of 9 bbls. Shut down pumps. Attempt to cock jars w/ no success, work pipe down to 500K (pressure bleed to 670 psi). Start pumps @ .75 bpm w/ 530 psi. 7% flow. Work up slow to 2.5 bpm w/ 860 psi w/ 14% flow. MW out 9.4 ppg vis 108. MW in 9.0+ vis 55. Total fluid pumped 350 bbls so far. Increase pumps f/ 2.5bpm to 3 bpm. 36PM w/ 940-753 psi w/ 25% flow. Total fluid pumped 420 bbls so far. Increase pumps f/ 3bpm to 5 bpm. 5 BPM w/ 800 psi w/ 26% flow. Total fluid pumped 500 bbls so far. Increase pumps f! 5 bpm to 6 then 7 bpm. 7 BPM w/ 900 psi w/ 30% flow. Total fluid pumped 870 bbls so far. Increase pumps f/ 7bpm to 8 then 9 bpm. 9 BPM w/ 940 psi w/ 33% flow. Total fluid pumped 2475 bbl, then pump 62 bbl sweep 9.2 ppg w/ 83 vis. Follow w/ 9.1 59-62 vis mud. Started working pipe @ 1645 hrs. PU 480k Printed: 9/30/2005 6:19:05 AM • ConocoPhillips Alaska Page 1o'of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From.. - To Hours .Code ' Sub ~ Phase Code 7/10/2005 117:45 - 20:00 ~ 2.25 FISH I CIRC INTRM1 20:00 - 20;30 0.50 i FISH CIRC I INTRM1 20:30-21:30 1.001 FISH (CIRC IINTRM1 21:30 - 23:15 1.751 FISH CIRC I INTRM1 23:15 - 00:00 0.75 FISH PULL INTRM1 7/11/2005 00:00 - 00:30 0.50 DRILL TRIP INTRM1 00:30 - 06:00 5.50 DRILL REAM INTRM1 06:00 - 07:45 1.75 DRILL .CIRC INTRM1 07:45 - 08:30 0.75 DRILL CIRC INTRM1 08:30 - 08:45 0.25 -DRILL TRIP INTRM1 08:45 - 09:15 0.50 DRILL CIRC INTRM1 09:15 - 11:15 2.00 DRILL TRIP INTRM1 11:15 - 11:45 0.50 DRILL TRIP INTRM1 11:45 - 12:30 I 0.751 DRILL I PULD I INTRM1 12:30 - 13:30 I 1.00 I DRILL I PULD INTRM1 13:30 - 14:30 1.00 DRILL PULD INTRM1 14:30 - 15:30 1.00 DRILL PULD INTRM1 15:30 - 16:30 I 1.001 RIGMNTI RSRV I INTRM1 16:30 - 18:00 1.50 DRILL PULD INTRM1 18:00 - 19:00 1.00' DRILL PULD INTRM1 19:00 - 20:00 1.00 DRILL PULD INTRM1 20:00 - 21:30 1.50 DRILL TRIP INTRM1 21:30 - 22:00 0.50 DRILL TRIP INTRM1 22:00 - 22:30 0.50 DRILL CIRC INTRM1 22:30 - 23:15 0.75 DRILL TRIP INTRM1 23:15 - 23:45 0.50 DRILL TRIP INTRM1 23:45 - 00:00 0.25 DRILL OTHR INTRM1 7/12/2005 00:00 - 01:15 1.25 RIGMNT RSRV INTRM1 01:15 - 02:00 0.75 DRILL OTHR INTRMI 02:00 - 02:30 0.50 DRILL TRIP INTRM1 02:30 - 06:00 3.50 DRILL REAM INTRM1 06:00 - 07:45 I 1.751 DRILL I REAM I INTRM1 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig. Release: 9/10/2005 Group: Rig Number: 15 Description of Operations Increase pumps f/ 9 bpm to 10 bpm. 10 BPM w/ 940 psi w/ 34% flow. Total fluid pumped after sweep, 600 bbls so far. Increase pumps f/ 10 bpm to 11 bpm. 11 BPM w/ 4150 psi w/ 35% flow. Total fluid pumped after sweep, 850 bbls so far. MW in 9.1 vis 61, mw out 9.1 vis 59. Increase pumps f/ 11 bpm to 12 bpm. 12 BPM w/ 1230 psi w/ 37% flow. Total fluid pumped after sweep, 1200 bbls so far. MW in 9.1 vis 61, mw out 9.1 vis 59. Pump 40 bbls water, follow w/ 80 bbl 9.0 mw 92 vis sweep. Continue circ @ 12 bpm 1100 psi 38% flow while working drill pipe and jars, pulled 450K and actuated jars, after. jars hit continue to pull up to 500K BHA began to move, worked pipe and BHA, pulled bit to 8,418' with 420K-480K at report time Pulling bit f/ 8,418' with 420K-480K, continue pulling to 8226'. Backream out of hole f/ 8226' to 4992'. Ream w/ 60 RPM, 12-14k torque, 337 gpm w/ 500 psi. Rig down Schlumberger wireline. Circ and condition mud and hole. Pump 920 gpm w/ 1750 psi, rotate 150 rpm. Perform derrick inspection after jarring.. Bit is inside of 13 3/8" casing. POOH 5 stands f/ 4992' to 4527', monitor fill, ok. Pump dry job, blow down top drive. POOH f/ 4527' to 1699'. UD top ghost reamer. Continue POOH f/ 1699' to 800', UD second ghost reamer. POOH f/ 800' to 358'. UD 1 jt 5" HWDP, UD HWDP above jars w/ shot holes. 31 dimples in jt. (lowest 7.35'. above pin end connection)(while in hole perfs @ 8379'-8384'). UD Daily/V1/eatherford jars{ ser # 15161078). POOH 1 stand 5" HWDP. UD Sperry Sun BHA. 8" NM flex DC's (ser# 192421, 192413, 192417), NM float sub (ser # 4150). Break Security 12 1/4" FMFX 553 bit (ser # 10394493) Download Sperry Sun MWD/LWD. UD 8" pulsar (ser # 78388K8), 8" GR/RES/PWD(ser # 7745HAWRGB), NM GP flex DC(ser # CP972705), Geo Pilot 9600 with top stab (ser # TL078) Service top drive. PJSM, PU/MU new BHA, MU bit #3. Upload Sperry Sun MWD tools. Continue PU/MU Sperry BHA. SLM 4 stands 5" HWDP. Continue trip in hole 11 jts 5" DP, MU Weatherford 12 1/4",ghost reamer, 28 jts 5" DP, Weatherford ghost reamer. RIH 5" DP f/ 1828' to 2550'. Fill pipe, break circ. R1H 5" DP f/ 2550' to 3500', fill pipe. RIH 5" DP f/ 3500' to 5026', fill pipe. Move 5" dp in derrick f/ ODS to DS. Inspect brakes on drawworks. Loose jam nut, tighten same. Replace broken grease fitting line. Base line PWD. RIH f/ 5086' to 5290'. Taking weight going down. No string weight left. Ream in hole f/ 5290' to 6389', rotate @ 60 rpm, pump 900 gpm w/ 2350 psi, 10'/min. PU wt 170k, so wt 80k, rot wt 125k. Torque 10-11 k. Ream in hole f/ 6389' to 6975', rotate @ 60 rpm, pump 900 gpm w/ Printed: 9/30/2005 6:19:05 AM • ConocoPhillips Alaska ''Page 11»of 45 .Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 ' Date ~ From -'To Hours Code Code~hase- 7/12/2005 06:00 - 07:45 1.75 DRILL REAM I INTRM1 07:45 - 14:30 6.75 DRILL REAM INTRM1 14:30 - 16:30 i 2.00 DRILL ~ CIRC i INTRM1 16:30 - 17:00 ~ 0.501 DRILL. i REAM INTRM1 17:00 - 18:00 I 1.001 DRILL I DRLG I INTRM1 18:00 - 00:00 I 6.001 DRILL I DRLG I INTRM1 17/13/2005 00:00 - 06:00 I 6.00 DRILL DRLG INTRM1 06:00 - 11:00 I 5.001 DRILL I DRLG I INTRM1 11:00 - 11:30 0.50 DRILL CIRC INTRM1 11:30 - 12:00 0.50 DRILL REAM INTRM1 12:00 - 18:00 6.00 DRILL i REAM INTRM1 18:00 - 00:00 ~ 6.00 ~ DRILL ~ REAM ~ INTRM1 7/14/2005 00:00 - 02:15 2.25 DRILL REAM INTRM1 02:15 - 03:30 1.25 DRILL CIRC INTRM1 03:30 - 04:00 0.50 DRILL TRIP INTRM1 04:00 - 05:30 1.50 DRILL CIRC INTRM1 05:30 - 06:00 0.50 DRILL OBSV INTRM1 06:00 - 09:30 3.50 DRILL TRIP INTRM1 09:30 - 11:00 1.50 DRILL PULD INTRM1 11:00 - 11:45 0.75 DRILL PULD INTRM1 11:45 - 12:00 0.25 DRILL TRIP INTRM1 12:00 - 13:00 1.00 DRILL TRIP INTRM1 13:00 - 16:30 3.50 CASE OTHR INTRM1 16:30 - 17:00 17:00 - 18:00 18:00 - 18:30 18:30 - 00:00 0.50 CEMEN PULD INTRM1 1.00 CASE RUNC INTRM1 0.50 CASE SFTY INTRM1 5.50 CASE RUNC INTRM1 7/15/2005 100:00 - 04:30 4.501 CASE I RUNC I INTRM1 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Spud Date: 6/26/2005 End: 9/10/2005 Group: Description of Opel-ations 2350 psi, 10'/min. PU wt 170k, so wt 80k, rofwt 125k. Torque 10-11k. Ream in hole f/ 6975' to 9048', rotate @ 150 rpm, pump 900 gpm w/ 2650 psi, 15'/min. PU wt 180k, so wt 95k, rot wt 133k. Torque 16-19k ft/Ibs ECD 9.98. No losses while reaming to bottom. Circ & cond to clean hole. Backream @ 2 fpm f/ 9048'-8950'. 910 gpm w/ 2650 psi, Up wt, 180k, Dn wt. 95k, Rt wt. 133k, Torque 16-19k ft/Ibs. Perform Base line for PWD w/ clean hole (9.94). Ream to bottom f/ 9048' to 9108' All reaming parameters same as above. Drilling f/ 9108' to 9170'. 750 gpm w/ 2050 psi. 120 rpm, Torque on bttm 16-18 k ft/Ibs, off bottom 16k ft/Ibs, Up wt 180k, Dn wt 95k, Rot wt 134k. ADT .55 hrs Drilling f/ 9170' to 9506'. 905 gpm w/ 2750 psi, 150 rpm, Up wt. 190k, Dn wt. 98k, Rot wt. 133k. Torque 14-20k ft/Ibs. ADT = 4.96 hrs. Drilling fP 9506' to 9960'.(TVD 3363'). Up wt. 195k, Dn wt 400k, Rot wt 130k, Torque 20-21 k ft/Ibs on bttm, 15-16k ft/Ibs off bttm w/ 150 rpm, 916 gpm w/ 2950 psi. ART= 3.95 hrs. ECD= 10.33 Drilling f/ 9960' to 10,420'.(TVD 3452'). Up wt. 190k, Dn wt 90k, Rot wt 130k, Torque 20-22k ft/Ibs on bttm, 17-22k ft/Ibs off bttm w/ 150 rpm, 900 gpm w/ 2950 psi. ART= 2.55 hrs. ECD= 10.4 Circulate w/ Rotation & reciprocation. MWD survey, SPR's Backream out of hole @ 2 fpm w/ 150 rpm, 900 gpm to clear cuttings from BHA. Back ream out of hole f/ 10,365' to 8706' @ 15 fpm w/ 150 rpm, 900 gpm. Record TAD data w/ backreaming. Torque 13-18k ft/Ibs. No Losses Back ream out of hole f/ 8706' to 6960'. 850 gpm w/ 2500 psi, 125 rpm. From 8706' to 8007' BROOH @ 2-3 fpm (Torque erratic 10-22k ft/Ibs) to help clean hole. BROOH f/ 8007' to 7436' @ 15-16 fpm (Torque 10-22k ft/Ibs). From 7436' to 6960' @ 15-16 fpm (Torque 13-17k ft/Ibs). ECD's f/ 10.4-10.1. Steady cuttings load @ shakers (no waves). Slight Losses (16 bhr) Continue BROOH from 6,960' - 5,897'. Circ bottoms up 2X, at 874 gpm, 1,900 psi. POOH from 5,897 - 5,054' - no problems. Circ hole clean @ 874 gpm and 1,900 psi, spot tube pill. RPM = 125, TQ = 9,000 ft-Ib, UWT = 135K, DWT = 100K, ROT = 115K. Monitor well -static. Pump dry job, blow down TD, drop 2-7/8" Rabbit. POOH to BHA. SLM 5" DP. LD Reamers. LD BHA -Jars, 3-Flex DCs, and break out bit. Download MWD. LD MWD Continue LD BHA, clean and clear floor. Change out bottom RAMS to 9-5/8". Function test Blind RAMs, Lower Pipe RAMS and Annular preventer. Pull Wear Ring, test 9-5/8" RAMS to 250 / 3,000 psi, 5 min each. Install Wear Ring and LD test Jt. RU Cement head. RU 9-5/8" Csg equipment. PJSM with all parties. PU/MU liner shoe joints. Check floats -okay. Run 70 jts of 9-5/8", 40 Ib/ft, L-80, BTC to 2,690' tmd. Spiralglider centralizers run on everyjoint (floating). Fill pipe every 5 joints. Run torque rings in every joint. Average MU tQ = 8,500 ft-Ib. Continue running 9-5/8" liner withou# problems. Run' a total of 144 jts Printed: 9/30/2005 6:19:05 AM ;; ConocoPhillips Alaska Page 12''of 45' Operations Summary''Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release:. 9/10/2005 .Group: Rig Name: Doyon 15 Rig Number: 15 -Date 'From - ToHours Code Code Phase ! Description of Operations 7/15/2005 00:00 - 04:30 4.50 CASE RUNC INTRMI 04:30 - 05:30 1.00 CASE RUNC INTRM1 05:30 - 06:00 ~ 0.50 ~ CASE ~ RUNC ~ INTRM1 06:00 - 12:00 I 6.00 CASE I RUNC INTRM1 12:00 - 15:00 3.001 CASE RUNC I INTRM1 15:00 - 18:00 3.00 CASE RUNC INTRM1 18:00 - 20:45 2.75 CASE RUNC INTRM1 20:45 - 21:00 0.25 CEMEN RURD INTRM1 21:00 - 00:00 3.00 CEMEN CIRC INTRM1 17/16/2005 100:00 - 01:30 I 1.501 CEMENl1CIRC I INTRM1 01:30 - 02:15 I 0.751 CEMENIiPUMP I INTRM1 02:15 - 03:15 I 1.001 CEMENlf OTHR I INTRM1 03:15 - 04:00 I 0.751 CEMENl(PUMP I INTRM1 04:00 - 05:15 1.251 CEMENICDISP I INTRM1 05:15 - 05:30 0.25 CEMEN OTHR INTRM1 05:30 - 07:45 2.25 CEMEN CIRC INTRM1 with a total of 142 spiralglider centralizers -floating. RD casing handling equipment and change elevators for 5" DP. Install wiper plug and MU 9-5/8" x 13-3/8" hanger. Mix packer hydraulic fluid and fill same. Set Iron Roughneck track and MU first stand of DP. CBU at 300 GPM and 200 psi. Rotate liner string at 10 rpm with 12-17K ft-Ib of torque. UWT=190K, DWT=102K, ROT=112K RIH w/ liner to 7,350'. Circ new mud in hole every 5 stds. UWT - 195K, DWT - 80K, ROT - 120K. Wash and ream pipe from 7,350 - 8100'. Note: Pipe would no longer slide downhole without pumping and or rotating from 7,350' on. Work pipe from 8,100 - 9,200'. UWT - 125K, DWT - 80K, ROT - 125K. Rotate at 10-15 rpm with 15-20K ft-Ib of TQ, 65 SPM and 320 psi. Continue to work liner to bottom circulating at 4-6 BPM with 320-380 psi, 15-20 RPM and 20 ft-1b of TO: Tag bottom and PU 6'. UWT=245K, DWT=90K. RU cmt head and circ lines. MU same. Rotate and reciprocate liner at 20 rpm. Circ and condition mud for cmt job. Stage pump from 4.5 BPM to 86PM at 500 psi. Mud before/after = 9.45/9.0 ppg, PV/YP = 16/25 =>11/16. Fin circ & cond mud for cementing, circ at 80 spm, 8 bpm at 560 psi, st up wt 205K do wt 145K, torque limiter set at 20K ft-Ibs with 10-20 rpm's up & down. Held PJSM W/Dowell, ASRC and rig crew on cementing detail and potential hazards, cont to circ hole while holding PJSM, Mud before/after = 9.45/9.0 ppg, PV/YP =.16/25 =>11l16. Tumed over to Dowell and pumped 10 bbls CW 100, pressure tested lines to 4,000 psi, pumped 30 bbls add. CW 100 at 8.3 ppg, ave 6.75 bpm at 350 psi, then pumped 40 bbls of MudPush at 10.5 ppg, ave 5 bpm at 100 psi, began mixing cmt @ 02:00 hrs, started pumping cmt at 02:02 cont to rotate & reciprocate pipe, at 02:15 after pumping 63 bbls of cmt, pump truck went down, appears to be an electrical problem (5hrs pump time on cmt). Worked pipe every 5 min's rot &recip & ck ok while Dowell swapped out pump trucks. Resumed pumping at 03:18 hrs, pumped an additional 242 bbls of cmt, pumped a total of 305 bbls (761 sxs) of DeepCrete cement at 12.5 ppg and 2.25 yield with additives, ave 5.75 bpm at 80 psi , cont to rotate and recip. pipe with fullreturns, shut down. Dropped DP wiper plug, Dowell pumped 10 bbls water and rig displaced cmt. With 9.0 ppg LSND mud, Initial rate 8 bpm at 400 psi, slowed pump rate to 3 bpm and saw LWP shear at 1,100 psi, cont to displace cmt at 8 bpm, final pressure at 8 bpm 690 psi, slowed to 3 bpm and landed liner wiper plug, cont to rot. &recip pipe till within 5 min of bumping plug, st wt up 200K, do wt 110K, with torque limiter set at 25K ft-Ibs had 10-15 rpms while working pipe, bumped plug on calc displacement, CIP at 05:10 hrs, Est TOC @ 6,305', had full returns during the job Pressured up on liner wiper plug to 2,500 psi and slacked off 40K and set Flex-Lock hanger, pressured up to 4,000 psi and released from HR running tool, bled pressure down to 750 psi and pulled out of "RS" packoff and pressure bled off, st up wt 140K, set TOL at 8,432' MD/2,265' TVD. Circ hole clean above TOL at 8,432', circ at 150 spm, 640 gpm at 1,180 Pflntetl: y/3U/ZUUS 5:19:05 AM • ConocoPhillips'A!aska Page 13 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date ~ From - To Hours ~ Code Code Phase Start: 6/22/2005 Rig Release: 9/10_/2005 Rig Number: 15 Spud Date: 6/26/2005 End: 9/10/2005 Group: 7/16/2005 105:30 - 07:45 2.25 ~ CEMENIiCIRC INTRMI 07:45 - 08:00 0.25 CEMEN RURD INTRM1 08:00 - 11:00 3.00 CEMEN TRIP INTRM1 11:00 - 12:00 1.00 CEMEN PULD INTRM1 12:00 - 12:30 0.50 CASE OTHR INTRM1 12:30 - 13:30 1.00 CASE RURD INTRMI 13:30 - 13:45 0.25 CASE SFTY INTRM1 13:45 - 00:00 10.25 CASE RUNC INTRM1 17/17/2005 100:30 - 010:30 I 10.00 CASE I RUNC I INTRM1 01:30 - 02:15 0.751 CASE I RUNC INTRM1 03:15 - 05:30 I 2.25 CASE I CIRC I INTRMI 05:30 - 06:00 0.50 CASE OTHR INTRM1 06:00 - 08:00 2.00 CASE OTHR INTRM1 08:00 - 09:30 I 1.501 CASE I OTHR I INTRM1 09:30 - 11:00 1.50 CASE OTHR INTRM1 11:00 - 12:30 1.50 WELCT NUND INTRM1 12:30 - 14:30 2.00 WELCT NUND INTRM1 14:30 - 15:30 1.00 WELCT NUND INTRM1 15:30 - 18:00 2.50 WELCT NUND INTRM1 18:00 - 19:00 1.00 DRILL PULD INTRM1 19:00 - 20:15 I 1.25 DRILL ~ PULD INTRM1 20:15 - 21:00 0.75 WELCT OTHR INTRM1 21:00 - 00:00 3.00 WELCT BOPE INTRM1 7/18!2005 ~ 00:00 - 02:00 ~ 2.00 ~ WELCTu BOPE ~ INTRM1 Description of Operations psi, at btms up saw a slight amount of CW 100 back at surface, monitored well static RD cement head/plug dropping head and lines POOH from 8,432' to liner running tool at 34' Made service breaks on liner running tool and LD same Pulled wear bushing RU GBR's 9 5/8" csg equipment Held PJSM on MU seal assembly, packer and RIH with 9 5/8" csg MU Baker 13 3/8 x 9 5/8" JMZXP packer with seal assembly and RIH slow with 9 5/8", 40#, L-80, BTCM csg to 4,650', RI H with 120 jts of 125 total to be ran, installed 1 straight blade aluminum centralizer on every 3rd jt st wt up 175K, do wt 118K Run 9-5/8", L-80, BTC-Mod, 40 ppf casing to liner top. 124 joints total, run-one centrilizer every third joint 41 total. Up Wt 175k, Drrwt 118k. M/U XO sub f/ Top Drive & torque same. P/U joint 125 & M/U same to TopDrive. PJSM w/ Company Rep, Toolpusher & Rig Hands. Break Circ w/ mud, 3 bpm @ 70 psi, 4 bpm @ 80 psi. Slack off locate seals S/D pumps slack to 4840' (No-Go) Mark Casing. Circ Bottoms up w/ Mud @ 4 bpm 100 psi. Displace to H2O @ 4830', Pump 6 bpm w/ 100 psi. Monitor well for flow (static) R/U lines & Reverse Diesel into annulus. 2.5 bpm. 110 psi. Continue to freeze protect annulus w/ diesel @ 2.5 bpm 270 bbls total FCP 320 psi. Slack off to insert seals & set JMZX packer. Set down all the available weight unable to get complete set, bleed off annular pressure to 200 psi & transfer more weight to packer. Press. up to test packer bleeding by. Increase pressurer 700 psi & bleed off same. Packer set. Pressure up to 1000 psi / 15 minutes O psi loss. Bleed off pressure & open Hydril. P/U to 275k to check packer (up wt 175k) PJSM- Break circ swedge, f/ 9-5/8" casing & Top Drive. blow down all lines, Pump out casing for cut-off, drain stack. Nipple down flow liine, turnbuckles choke line, drip pan, split stack stack & raise same. P/U casing to 225k, center casing, set slips, cut-off 9-518" casing and clean up metal shavings. Install 13-3/8" X 9-5/8" pack-off seals. Set down BOPS. Test seals to 2200 psi / 15 min. OK. Nipple up BOPs, Clean out cement in flow line f/ surface job. Change bottom rams to 6" X 3-1/2" VBRs. Check accumulator bottles. Break down TI W valve & XO f/ Top of joint. UD 9-5/8"joint & cut off joint (9.90') P/U cmt head & break down same. Clear floor R/U for BOP test Test BOP's. Lou Grimauldi, AOGCC rep witnessed test. Test to 250 psi low, 3000 psi high. Test BOP's 250/ Low 5 min, 3000/ high 5 min, Chart test. AOGCC rep. Lou Grimauldi witnessed the test. Tested Hydril, HCR's, Upper rams, Choke manifold (valves 1-18), Floor safety valve, Dart valve, Manual choke & Kill line valves, Lower pipe rams, Blind rams, Upper IBOP, Lower IBOP. Perform Accumulator test, Starting pressure 3000, PSI Printed: 9/30/2005 6:19:05 AM • '' ConocoPhillips;Rlaska Page 14 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From -'To Hours ~' Code Code ~ .Phase '' 7/18/2005 00:00-02:00 2.00 WELCT BOPE INTRM1 02:00 - 02:30 0.50 DRILL RIRD INTRM1 02:30 - 04:30 2.00 DRILL TRIP INTRM1 04:30 - 05:30 1.00 RIGMNT RSRV INTRM1 05:30 - 06:00 0.50 DRILL PULD INTRMI 06:00 - 06:30 0.50 DRILL PULD INTRM1 06:30 - 14:00 7.50 DRILL TRIP INTRMI 14:00 - 15:00 1.00 RIGMNT RSRV INTRMI 15:00 - 18:00 3.00 RIGMNT OTHR INTRMI 18:00 - 20:00 2.00 RIGMNT OTHR INTRM1 20:00 - 23:00 3.00 DRILL PULD INTRM1 23:00 - 00:00 1.00 DRILL PULD INTRM1 7/19/2005 00:00 - 00:30 0.50 DRILL PULD INTRM1 00:30 - 01:45 1.25 DRILL PULD INTRM1 01:45 - 08:30 6.75 DRILL TRIP INTRM1 08:30 - 11:30 3.00 DRILL TRIP INTRM1 11:30 - 12:00 0.50 DRILL SFTY INTRM1 12:00 - 15:30 3.50 DRILL CIRC INTRM1 15:30 - 18:00 I 2.501 DRILL I DEOT I INTRM1 18:00 - 19:15 I 1.251 DRILL I OTHR I INTRM1 19:15 - 00:00 4.751 DRILL (TRIP INTRM1 7/20/2005 00:00 - 01:30 1.50 DRILL - PULD INTRM1 01:30 - 02:00 0.50 DRILL OTHR INTRM1 02:00 - 04:15 2.25 DRILL TRIP INTRM1 04:15 - 06:30 2.25 DRILL OTHR INTRM1 06:30 - 07:30 1.00 DRILL OTHR INTRM1 07:30 - 09:00 1.50 DRILL OTHR INTRM1 09:00 - 10:00 1.00 DRILL OTHR INTRM1 10:00 - 12:00 2.00 DRILL DEQT INTRM1 12:00 - 13:30 1.50 DRILL OTHR INTRMI 13:30 - 16:30 3.00 DRILL OTHR INTRM1 16:30 - 17:00 0.50 DRILL . OTHR INTRM1 17:00 - 18:00 1.00 RIGMNT RSRV INTRM1 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations after function 1450, 200 psi increase 38 seconds, Final pressure build 3 minutes 45 seconds. Nitrogen bottles average press, 2450 psi. Rig down Test Equipment & set wear ring. OD = 13-7/16", ID = 9", Length = 3.18' RIH w/ 50 Stds f/ Derrick. Cut & Slip Drilling Line 106' Bring Lo-Tads to floor. Bring Lo-Tads to floor. Caliper, strap & record serial numbers. POOH install Lo-Tads on stands. SLM stds in derrick. Service Top Drive. Shim Top Drive rails for motor alignment Continue to Shim Top Drive rails. P/U Geo-Pilot and MWD tools. Make up BHA Upload LWD tools, Shallow test Tools Load Nuculear Sources in MWD Picking up BHA, Breaking in new heavy Wt. Drill Pipe. Picking up new 5" Drill Pipe Make and Brake. Trip in Hole (out of Derrick). Tag CMT @ 10,306' PJSM; All Personal Involved in change out well to Oil Base Mud Displace well to 9ppg Oil Base Mud. Start Pumping @ 2 bpm, Rotate @ 5 rpm. Staging Up SPM + RPM to 70spm, 120 rpm's. Pumped; 50bbls Mineral oil,65bbls High Vis Spacer, Oil Base Mud 9ppg. Test 9 5/8" 40ppf Csg. Bit Depth 10,249' Pressure up to 3,000psi. Bleed off. Check Surface Equipment and pressure test surface equipment T/3,000psi.O.K. Pressure up Csg, To 500psi. Watching press on 13 3/8 x 9 5/8 annulas, 240psi. 9 5/8 csg bled down To 110psi.13 3/8 x 9 5/8 Annulas press to 260psi. Monitior Well, Build and pump Dry Job 2ppg over, Trip Out the hole for RTTS. Trip Out Hole T/ Bha, Calculated Fill 75bbls-Actual Fill 117bb1s. Working BHA Calc fill 7.7bbls -Actual 8.2bbls. PJSM;,Remove Nukes, De-energize MWD, Lay Down Pressure sub. Clean Rig Floor, Load RTTS in Pipe shed. P/U RTTS Tool, Run in Hole to 5,059' Set RTTS Set RTTS Tool pump down 9 5/8 annulas. Test Tie Back, Press up to 800psi. injecting. Shut in Press bleed down to 280psi. in 6 minutes. Test down Drill Pipe testing 5,059' to 10,306' T/ 3,000psi. held for 15 min loss 70psi. Pull up to 4,812' test annulas 3,000 psi. no loss. Move 4,869' Pump down Drill Pipe Press 3,000psi. 10min no loss. Leak Isolated @ 4,812'-4,869' R/U Test 13 3/8 x 9 5/8 annulas to 1,000psi. 10 min no Loss. Pull up RTTS to 4,812' and perform infectivity test. @ lbpm =1,081 psi. 1.5 bpm 1,370psi. 2 bpm 1,730 psi. Shutin Well bled down to 510psi. Unset RTTS, Blow down test line's. Monitior well, Clean pits #5, Pill pits #1 &#2. Isolate leak Set RTTS, 4,853-4,863', 4,862',4,861',4,860',Leak @ 4,858'-4,860'. Mix 65 bbls Biozan Spacer, Mix 35 bbls Mineral Oil Pill, PJSM W/ Crew and support Personal, Displace Well 35 bbls Mineral Oil Pill, 50 bbls Biozan Spacer, Water Spot 10 bbls Biozan pill @ 4,965 Service Top Drive, Grease Crown Printed: 9/30/2005 6:19:05 AM • ConocoPhillips Alaska Page 15 of 45 Operations Summary Rep.©rt Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Dater 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours f Code »;Sub phase ~ Description of Operations Code ~ 7/20/2005 18:00 - 21:00 3.00 WAITON EOIP INTRM1 21:00 - 21:45 0.75 CEMENI~SOEZ? INTRM1 21:45 - 22:15 I 0.501 CEMENI~SOEZ I INTRM1 22:15. - 23:45 I 1.501 CEMENli SOEZ I INTRM1 23:45 - 00:00 I 0.251 CEMENI~SQEZ INTRM1 17/21/2005 X00:00-01:15 ~ 1.25~DRILL CIRC INTRMI 01:15 - 04:45 3.50 DRILL TRIP I INTRM1 04:45 - 06:45 2.00 DRILL PULD INTRM1 06:45 - 07:15 I 0.501 CASE I MIT I INTRMI 07:15 - 10:30 I 3.251 DRILL (TRIP I INTRM1 10:30 - 12:00 1.50 CASE CIRC INTRM1 12:00 - 14:00 2.00 CASE DEOT INTRM1 14:00 - 18:30 4.50 DRILL TRIP INTRM1 18:30 - 19:30 1.00 DRILL OTHR INTRM1 19:30 - 22:00 2.50 DRILL TRIP INTRM1 22:00 - 22:15 0.25 DRILL TRIP INTRM1 22:15 - 22:45 0.50 DRILL CIRC INTRM1 22:45 - 00:00 1.25 CASE MIT INTRM1 17/22/2005 100:00 - 01:15 I 1.251 CASE I OTHR I INTRM1 01:15 - 01:30 0.25 CASE OTHR INTRM1 01:30 - 01:45 0.25 DRILL TRIP INTRM1 01:45 - 02:15 0.50 CASE MIT INTRMI 02:15 - 05:30 ~ 3.251 CASE MIT I INTRM1 05:30 - 06:30 I 1.00 I CASE I OTHR I INTRM1 Wait On Cementers, Rig Serv. Prepare for Cmt Job. R/U Cementers, Install TIW Head Pin space out.Set @ 4,812' RTTS @ 4,810' Pump 5 bbls water, Press Test 3,000psi.Set RTTS Perform Injection test W/ Dowe11.1BPM-500psi. 1 1/2 BPM-950psi. 2 BPM-1,100psi. Shut in 1 min press 600psi. Pumped total of 21 bbls. Bled Back total 17.3 bbls. PJSM; Pump 2 bbls water to insure RTTS unseated. Close Hydril Batch up CMT. Pump 20 bbls CMT. Hold holding 350psi. Back pressure @ 3BPM. 150 psi. 55 bbls. Water @ 4BPM. 500psi. Slow to 2 bbls min. Set RTTS. Bleed press off 9 5/8x5" Annulas. Open Hydril. to insure RTTS set. 73bbls into displcement 150 psi. increase. 100 to 150psi. increase per bbl. Squeezed 18 bbls Cmt. into leak 2 bbls left in csg.13 3/8 x 9 5/8 annulas = 14bbls cap to shoe. RTTS to leak capacity 3.7 bbls. Capacity Drill pipe 86 bbls, Pump total 89 bbls water final Press 2,408psi. Hold for 5 min press no losses. Bleed back volume 5 1/2 bbls. Unseated RTTS Pull 10' Monitior no flow back. Line up To Reverse Circulate. 36 spm 360 psi. 3bbl of contamanated return's @ BTM up. Reverse Circulate. 36 spm 360 psi. 2x Btms Up. Approx. 3 bbls Contaimanated Water Back to surface. Monitior well, POOH W/ RTTS. P/U Rotary Steerable BHA, P/U Pulsar sub, Plug into Mwd tools Upload. Shollow Test tools. R/U to test casing. Press up to 300psi. Call from town shut down test. Bleed off Trip in hole Rotary steerable and W/ MWD pulse test Load sources. Trip in to 4,957' Up Wt. 120k, Dn Wt. 95k. Rt Wt. 120k. Trq 8k. 640gpm. 500 psi. Circulate 640 gpm 500 psi. Btm Up. Rig Up & Test Csg. Would not test.bled back to 300 psi Bleed off pressure 6 bbls. retuns. R/D test equipment, Monitior well. Pull out hole, PJSM remove Nukes, Download MWD, L/D pulsar Sub. P/U RTTS Change out element. Trip in Hole, T/ 5,235' took weight 4,000#. Pull out hole T/ 4,960' Spot 12 bbls Bio-zan pill, 38spm 159gpm 130psi. Pull Out Hole T/ 4,866' Set RTTS test Failed, Move down to 4,869' set RTTS test failed. Pull 4,813' test Bacck side T/2,000psi. Test O.K. Move to 4,894' Tested O.K. Pulled up to 4,884 test failed. Pull up T/ 4,854' test annulas test O.K. Good Test, From 4,854' to Surface all tested Good. From 4,894' to 10,306' tested.good. Pull up Hole T/ 4,780' R/U for squeeze talk to Engineer trouble. shoot leak. R/D Cmt equipment Trip in Hole. T/ 4,970' R/U to Test 13 3/8x9 5/8 500 psi. Held F/ 10 min. no loss, Pull up to Re-Test and isolate leak. Pull up to 4,895 Re-Test and isolate leak. No test trouble setting RTTS. Move down to 4,957' Test down Drill pipe. Tested T! 1,500psi. @ 5'-10' Increaments T/ 4,862' all good test. 4,857' Did not test. Tested down 9 5/8"x5" Ann. Tested T/ 1,800psi. Tested Good. Isolating Leak @ 4,857-4,862'. Monitior well R/D Testing Equipment. Blow down lines. Printed: 9/30/2005 6:19:05 AM • U ConocoPhillips Alaska Page 16 of 45` Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours ~' Code ~ Code ( Phase ~, 7/22/2005 06:30 - 08:00 1.50 CASEPTCH INTRM1 08:00 - 11:45 3.75 CEMEN SOEZ INTRM1 11:45 - 13:30 1.75 CEMEN CIRC INTRM1 13:30 - 17:30 4.00 CEMEN CIRC INTRM1 17:30 - 18:00 0.50 CEMEN RURD INTRMI 18:00 - 19:00 1.00 WAITON CMT INTRM1 19:00 - 22:00 3.00 CEMEN TRIP INTRM1 23:00 - 0:00 1.00 CEMEN~TRIP INTRM1 00:00 - 01:15 I 1.251 DRILL I TRIP I INTRM1 01:15 - 03:00 I 1.751 DRILL I CIRC I INTRM1 03:00 - 05:15 I 2.251 DRILL I REAM I INTRM1 05:15 - 06:00 0.75 DRILL CIRC INTRM1 06:00 - 07:00 1.00 CASE OTHR INTRM1 07:00 - 09:00 2.00 CASE MIT INTRMI 09:00 - 10:30 1.50 CASE PTCH INTRM1 10:30 - 12:00 1.50 CASE .PTCH INTRM1 12:00 - 14:00 2.00 CASE PTCH INTRM1 14:00 - 15:30 1.50 CASE CIRC INTRM1 15:30 - 18:00 2.50 DRILL TRIP INTRM1 18:00 - 20:00 2.00 DRILL TRIP INTRM1 20:00 - 21:00 .1.00 DRILL TRIP INTRM1 21:00 - 22:15 1.25 DRILL TRIP INTRM1 22:15 - 23:00 I 0.751 DRILL I TRIP. I INTRM1 23:00-00:001 1.OO~DRILL (TRIP IINTRM1 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations P.O.O.H; Position RTTS Packer @ 4,589' R/U To Squeeze CMT. PJSM: Unseat packer Circulate 5 bbls water, Test lines T/ 3,000psi. Seat RTTS. Establish Injection rate 2 bpm @ 950 psi. after shut down for 1 min 550 psi 2min 490 psi.Bled back 6 1/2 bbls Total pumped 14bbls, Release packer pump 2 bpm verify circulation, Close Hydril Circulate through Choke, Batch up CMT @ 09:30. Pump 20 bbls 15.81b per gal.yield 1.17 mix fluid 5.207per/sx Porisity 59.4% solid frac. 40.6%. CMT. 3 bbls per min. 150 psi. 400psi. back press. Displace W/ Water 56 bbls water displaced Slow T/ 1 BPM seat RTTS bleed off annulas Open Hydril to verify no communacation past RTTS. Pump 82 bbls CMT T/ Leak @ 4,862' Press 1,111psi. @ 1 BPM. Squeeze 10 Mils stop press. 1,240psi. Press drop 1,029' after 5 min. Start pumping 1BPM squeeze 5 bbls Press 1,794psi. Stop hold 15 min. press drop T/ 1;258psi. Pump @ 1/2 BPM. Squeeze 1 bbtstop press: 1,551 psi. CIP @ 11:05. Hold F/ 30 min. press drop 905 psi. Bleed back volume 4 3/4 bbls. Unseat RTTS Reverse Circulate 4 bpm 530 psi. No Cmt returns no losses or gains. High PH in returns. Circulate 3 Drill pipe Volume's Ph dropped. Circulate down Drill pipe @ 3 BPM 60 psi. R/D CMT Equipment Blow Down. Monitior Well, W.O.C. P.O.O.H. Lay down RTTS small piece of rubber stuck above element. Not Part of element. P/U Clean out BHA. Trip in hole with BHA # 7. Drill pipe has cement remnants rattle pipe going in hole.4,576'. Trip in hole with BHA # 7. Slow Looking for Cmt Stringers T/ 5,046' No Cement. PJSM; Displace Top of Hole back to Oil Base Mud, Pump 40 bbl high vis Spacer, 70 bbl Base Oil Pill, Chase With OBM. Rotate and Reciprocate pipe. TIH took weight @ 5,054', Wash and Ream CMT stringers F/ 5,054 - 5,718' Started to clean up @ 5,430' - 5,718' Circulate and clean hole for Casing Test. R/U Test Equipment, Test 9 5/8" CSG, Pressure up T/ 500psi. Bleed off pressure test surface lines T/ 2,000psi., Pressure CSG. T/ 1,000psi. Shut in F/ 30 min 695psi. Final Pressure, Bleed Back 6.8 bbls. Pull out of hole. T/ 4,850' Mix 67 bbl Calcium pill, 10 ppg, 280 Viscosity Pump 50 bbls of Pill, Close Hydril ,Squeeze @ 1/2 - 1 bbls per min., Final pump press. 1100-850psi. Bleed off pressure, Check Flow, Open Hydril Circulate B/U, Monitor well, Pump dryjob, Blow down Top Drive. Pull out of hole for BHA # 8 Pick Up BHA # 8 load MW D tools and PJSM on Nukes. Load Nukes. Trip in Hole, Rattle Drill Pipe while tripping in hole, cement in pipe. Pull out Hole, To pulsar check for Cmt, Pieces. Clean Out Cement From Float Sub and Pulsar. Trip in Hole 20 stands inspect Drill Pipe see no More Cmt in Pipe. @ 2099' Pull Out Hole Laying Down pipe with Cement Stringers in pipe. Wet Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page' 17 of 45 Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Date 7/23/2005 7/24/2005 From - To 1 E-170 1 E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 I Hours ~ Code 'Code .Phase 23:00 - 00:00 1.00 DRILL TRIP INTRM1 00:00 - 03:45 3.75 DRILL PULD INTRM1 03:45 - 04:30 0.75 DRILL OTHR INTRM1 04:30 - 12:00 7.50 DRILL TRIP INTRM1 12:00 - 12:45 I 0.751 DRILL I CIRC I INTRM1 12:45 - 14:00 1.25 DRILL TRIP INTRM1 14:00 - 17:30 3.50 CEMEN DSHO INTRM1 17:30 - 18:00 0.50 CASE MIT INTRM1 18:00 - 19:00 1.00 CEMEN DSHO INTRM1 19:00 - 21:00 2.00 DRILL CIRC INTRM1 21;00 - 22:30 I 1.501 DRILL I LOT I INTRM1 22:30 - 00:00 I 1.501 DRILL I DRLH I PROD 17/25/2005 100:00 - 01:15 I 1.251 DRILL I DRLH I PROD 01:15 - 02:15 I 1.001 DRILL I TRIP I PROD 02:15 - 03:45 1.50 DRILL OTHR PROD 03:45 - 05:00 1.25 DRILL CIRC PROD 05:00 - 05:30 0.50 DRILL TRIP PROD 05:30 - 10:30 5.00 DRILL DRLH PROD 10:30 - 13:00 I 2.501 DRILL I CIRC I PROD 13:00 - 13:45 0.75 DRILL TRIP PROD 13:45 - 14:15 0.50 DRILL OTHR PROD 14:15 - 18:00 3.75 DRILL TRIP PROD 18:00 - 22:00 4.00 DRILL TRIP PROD 22:00 - 22:30 0.50 DRILL PULD PROD 22:30 - 00:00 1.50 DRILL TRIP PROD 7/26/2005 00:00 - 00:30 0.50 CEMEN OTHR PROD 00:30 - 05:00 4.50 CEMEN TRIP PROD 05:00 - 05:30 0.50 CEMEN CIRC PROD 05:30 - 05:45 0.25 CEMEN PLUG PROD 05:45 - 06:45 1.00 CEMEN TRIP PROD 06:45 - 07:15 0.50 CEMEN CIRC PROD 07:15 - 07:30 0.25 CEMEN SFTY PROD 07:30 - 09:15 1.75 CEMEN PLUG PROD 09:15 - 10:30 I 1.251 CEMENItTRIP I PROD Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description' of Operations Pipe, Suck Out with Vac. Plug W/Absorbant. 20 Jts down. Pull Out Hole Laying Down pipe with Cement Stringers in pipe. Wet Pipe Suck with Vac. Plug W/Absorbant. Clean Rig Floor and Derrick leg. Trip in Hole With BHA #8 Pick up New 5" Drill Pipe Make and Brake and Make all newjts. Trip in Hole 7/8,168' Circulate Bottoms Up @ 8,168' 633 GPM, 3,120psi. 40 RPM 8-9k nTorq. Rt Wt-120k, Up Wt-165k, Dn Wt-110k Trip in Hole T/ 10,302' Drill Landing Collar @ 10,302'. Float Collar @ 10,343',. CMT T/ 10,410' Circulate and Perform Press Test T/ 525psi. Drill Out Shoe @ 10,417', Drill To 10,450' 30' New Hole. Pull Back T/ Shoe.Circulate and Condition For Leak Off Test, MWD base line-test ECD. - - R/U Perform Leak Off Test EMW 12.1 @3,437' TVD 3437' 9 ppg.10 min gels 34, Pumped 10.1 bbls, Bleed Back 9 bbls. Drilling f/ 10,450' -T/ 10,602'.TVD 3,489' 600 gpm. W/3,720 psi. 120 rpm, Torque on bttm 10-15 k ft/Ibs, off bottom 12k ft/Ibs, Up wt 200k, Dn wt 95k, Rot wt 134k. ADT .55 hrs. Drilling f/ 10,602' -T/ 10,757'.TVD 3,518' 500 gpm. W/2200 psi. 100 rpm, Torque on bttm 10-20 k fUlbs, off bottom 12k ft/Ibs, Up wt 200k, Dn wt 95k, Rot wt 134k. ADT .89 hrs. Pump Out Hole T/ 10,329' Circulate Bottoms Up. Directional difficutly's not able to build. dropped out of A sands. Monitior Well, Clean Rig. Call 1E-170 engineer. Circulate and Condition Waite On Decision From Town Trip In Hole T/ 10,757 Drilling f/ 10,757' -T/ 11,230'.TVD 3,550' 420 gpm. W/2,270 psi. 60-70 rpm, Torque on bttm 10-15 k ft/Ibs, off bottom 12k ft/Ibs, Up wt 230k, Dn wt 95k, Rot wt 140k. ADT 3.29 hrs. Circulate and Condition, 600 GPM 3,660psi. Was Building incl, 3.5 to 4 last 100' lost ability to build. Monitior Well: Pull Out Of Hole above Shoe @ 10,371' Monitior Well; Pump Dry Job. Trip Out Hole; To 5" Hwt DP monitior well. Stand Back HWT Drill Pipe/Jars, PJSM On handling Sources, Clear Floor, Remove Source. Down Load MWD UD BHA. Change Out Elevators and R/U Tbg. Tongs to Run 2 7/8 tbg. stinger. Trip in Hole P/U 2 7/8" Rabbit 1-Mule Shoe jt. and 31Jts. Move Flex Collars and 5" HWT DP. to drillers side to run 5" Drill Pipe. M/U XO and Trip in Hole W/5" Drill Pipe, From derrick to 10,385` Break circulation @ 10,385' 3pm 480 psi. Trip in Hole; T/ 11,206' Break circulation @ 10,385' 6pm 980 psi. Up Wt - 195k, DN WT.-100k, R/U To Cement. PJSM; Pump Cement Balanced Plug. Pumped 15 bbls biozan Pill, 3 bbls water test cement lines to 3,000psi. 70 bbls 17 ppg yield 1 mix Fluid 3.867 gal/sx Cement porosity 51.5%, solid fraction 48.5% Slurry type Conventional. Hold Back press on Annulas not exceed LOT. 3 bbls water 2 bbls biozan. Displaced W/ 9 ppg. OBM. 172 bbls. UD top Single with head pin P.O.O.H. Slowly Approximately 3 min stand, pipe 2/3 dry. T/ 10,187', Printed: 9/30/2005 6:19:05 AM • ConocoPhillips,A1aska Page 1 s''of 45 Operations Summary Report' Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: ROT -D RILLIN G Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM @conoc ophillip s.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours Code Code Phase Description of Operations 7/26/2005 10:30 - 12:45 2.25 CEMEN CIRC PROD M/U Top Drive 10,187' pumped 5bbls to clear pipe, P/U joint W! Head Pin run in T/ 10,215 R/U cement Hose to Reverse Circulate Btms up. Taking returns to one tank monitor losses, No Losses @ 3BPM-630 psi. Dump 20 bbls Spacer pill Contaminated OBM. Approximant Cement Top @ 10,245'. Circulated Total 238bb1s. 12:45 - 14:30 1.75 CEMEN CIRC PROD Rig Down Cement Hose and Head pin, Make Up Top Drive Circulate Down drill Pipe 7 BPM - 1,030psi. 10 RPM Pumped BTMS UP @ 545 bbls. 14:30 - 14:45 0.25 CEMEN OTHR PROD Monitor well pump slug. 14:45 - 18:00 3.25 CEMEN TRIP PROD . Trip out hole T/ 1,013' 2 7/8 tbg. 18:00 - 19:00 1.00 CEMEN RURD PROD R/U Csg. Tongs, To lay Down 2 7/8 tbg.(Crew Change) 19:00 - 21:15 2.25 CEMEN PULD PROD Lay Down 2 7/8 Tbg. Stinger. 21:15 - 22:15 1.00 CEMEN RURD PROD R/D Tbg. Equipment and Clean Rig Floor. 22:15- 23:30 1.25 WELCT BOPE PROD Rig Up Test Equipment To test BOPE, 23:30 - 00:00 0.50 WELCT ROPE PROD Test BOPE 250 low, 3,000High. 7/27/2005 00:00 - 03:45 3.75 WELCT BOPE PROD Test BOP's 250! Low 5 min, 3000! high 5 min, Chart test. AOGCC rep. Chuck Scheve waived wittness of test. Tested Hydril, HCR's, Upper rams, Choke manifold (valves 1-18), Floor safety valve, Dart valve, Manual choke & Kill line valves, Lower pipe rams, Blind rams, Upper IBOP, Lower IBOP. Perform Accumulator test, Starting pressure 3000, PSI after function 1700, 200 psi increase 39 seconds, Final pressure build 2 minutes 58 seconds. Nitrogen bottles average press, 2450 psi. 03:45 - 04:45 1.00 WELCT NUND PROD Pull Test Plug, Set Wear ring. 04:45 - 08:30 3.75 DRILL PULD .PROD P/U BHA; Motor Wl1.5 deg bend, MWD, Up load Tools, PJSM handle Source, Shallow Test MWD tools Rate 445 gpm-800psi. Load Source. TIH W/ BHA. 08:30 - 13:30 5.00 DRILL TRIP PROD Trip in hole: Filling Pipe every 25 stands, SLM in Hole. Strap difemce 2'. 13:30 - 14:45 1.25 RIGMNT RSRV PROD Cut Drill Line, 154', Inspect Brake linkage and re-seal chain cover 14:45 - 15:45 1.00 RIGMNT RSRV PROD Rig Service 15:45 - 16:15 0.50 DRILL TRIP PROD Trip in hole: Tag Cement @ 10,216' 16:15 - 18:00 1.75 DRILL OTHR PROD Drill Cement; From 10,216' - 10,420' Rot Wt 130k 18:00 - 00:00 6.00 DRILL DRLH PROD Dill Ahead: Side Track From 10,420' to 10,544' Tie in Survey's @ 10,463' 78.24 incl. 180.75 Azm. @ 10,512' 78.64 incl. 181.27 Azm. New Survey @ 10,481' 82.06 incl 179.12 Azm. " Up Wt. 210,Dn Wt. 85, Rot Wt. 135, Tq on Btm 18-20, Tq Off Btm 15, W.O.B. 10-20. Art-.41hrs, Ast-3.41 hrs.Jar Hrs- 9.85. Bit Hrs-4.52. 7/28/2005 00:00 - 06:00 6.00 DRILL DRLH PROD Drill Ahead: From 10,544' to 10,917' M.D. 3,498' ND. Up Wt. 225,Dn Wt. 90, Rot Wt. 140,RPM 80, GPM 590, Press On BTM 3,200, Off BTM 3,100psi. Tq on Btm 18-20, Tq Off Btm 15, W.O.B. 10-20.Art-.68hrs, Ast-2.47hrs.Jar Hrs- 12.95. Bit Hrs-7.62. APIG=41.41, Totai ft Drilled 49T, Average ROP 65' per hr. 06:00 - 12:00 6.00 DRILL DRLH PROD Drill Ahead: From 10,917' to 11,282' M.D. 3,469' ND. Up Wt. 230,Dn Wt. 85, Rot Wt. 140,RPM 90, GPM 600, Press On BTM 3,540, Off BTM 3,450psi. Tq on Btm 18-22, Tq Off Btm 17, W.O.B. 5-15. Art-.2.88hrs, Ast-1.49hrs.Jar Hrs- 15.58. Bit Hrs-10.25. APIG=47' per hr. Total ft drilled 862' Average ROP 84 ft per hr., Began Running 5" Hwt Drill Pipe @ 10,943' for push pipe. Pumped Weighted Sweep @ 11,173' 11 ppg. 117vis. Approximately 20°I° increase in cutting sweep to surface. 12:00 - 18:00 6.00 DRILL DRLH PROD Drill Ahead: From 11,282'to 11,700' M.D. 3,469' ND. Up Wt. 245,Dn Wt. 85, Rot Wt. 150, RPM 90, GPM 600, Press On BTM 3,580, Off BTM 3,430 psi. Tq on Btm 18-22, Tq Off Btm 18, W.O.B. 5-15. Art- 1.36hrs, Ast-1.35hrs. Jar Hrs- 18.29. Bit Hrs-12.96. APIG=53' per hr. Total ft drilled 1280' Average ROP 98.7 ft per hr., Continue Running 5" Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 19 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common W ell Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: ROT -D RILLIN G Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM @conoc ophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - To Hours Code Code .Phase Description of Operatio-ns 7/28/2005 12:00 - 18:00 6.00 DRILL DRLH PROD Hwt Drill Pipe for push pipe. Changed Over to rig power @ 13:15hrs. 18:00 -.21:00 3.00 DRILL DRLH PROD Drill Ahead: From 11.,700' to 11,887' M.D. 3,481' TVD. Up Wt. 255,Dn Wt.100, Rot Wt. 160, RPM 90, GPM 600, Press On BTM 3,610, Off BTM 3,450 psi. Tq on Btm 18-20, Tq Off Btm 18, W.O.B. 5-15. Art- .63hrs, Ast-.90hrs. Jar Hrs- 19.82. Bit Hrs-14.49. APIG=54' per hr. Total ff drilled 1467' Average ROP 101ft per hr, Continue Running 5" Hwt Drill Pipe for push pipe. 21:00 - 00:00 3.00 RIGMNT RGRP PROD Top Drive Down: Can Pump and Break and Make Up Drill Pipe, Cannot Rotate in Drilling Mode. Pump and Work pipe out of hole slowly T /11,589' while Trouble shooting Top Drive, GPM 425, 2,000psi. Talk with Geologist, Strata Steer, Directional Driller, Project Engineer and Project Geologist on Directional Plan 7/29/2005 00:00 - 02:45 2.75 DRILL TRIP PROD Pump Out Hole From 11,589' - 10,351'. @ 400 gpm, 2000psi. Up Wt. 240k, Dn Wt 100k, 02:45 - 03:15 0.50 DRILL OTHR PROD Monitior Well, 15min. Pump Dry Job. 03:15 - 08:00 4.75 DRILL TRIP PROD Trip Out Hole. 10,351' to 287'. Top Drive Still Down Waiting. on Part. 08:00 - 12:00 4.00 DRILL PULD PROD Work BHA: PJSM on pulling Sources, Remove and Store I Density(gamma) and Neutron Sources. Plug in and Down Load LWD Tools. Lay Down BHA. 12:00 - 13:30 1.50 RIGMNT RSRV PROD Rig Service 13:30 - 15:30 2.00 LOG TRIP PROD Pick Up, BHA #10 - 8 1/2 Bit / 9 5/8 Scrapper /Junk Basket, Run Collars and all Hwt Drill Pipe. 15:30 - 17:45 2.25 LOG TRIP PROD Trip in Hole to 5,877' Up Wt. 150k, Dn Wt. 85k. 17:45 - 18:00 0.25 LOG TRIP PROD Monitior Well 18:00 - 19:00 1.00 LOG TRIP PROD Trip Out Hole From 5,877 to 4,737' 19:00 - 19:15 0.25 LOG TRIP PROD Monitior Well, Clean Floor 19:15 - 20:00 0.75 LOG TRIP PROD Trip in Hole; To 5,837' W/Scrapper 20:00 - 21:15 1.25 LOG CIRC PROD Circulate 2x Btms Up @ 650 GPM, 2,000 psi. 21:15 - 00:00 2.75 RIGMNT RSRV PROD PJSM: Change Out Drill Line, Change Out To new drill Line Spool. 7/30/2005 00:00 - 00:30 0.50 RIGMNT RSRV PROD Finish Changing Out Drill Line New Spool, 00:30 - 03:45 3.25 DRILL TRIP PROD Trip Out Hole: With 9 5/8" Scrapper, Lay Down Bit and Scrapper Retrieved pieces of Alunimuim and Cmt Chunks out of Junk Baskets. 03:45 - 04:15 0.50 DRILL OTHR PROD Clean and Clear Rig Floor, 04:15 - 05:30 1.25 DRILL OTHR PROD P/U Geo Pilot and LWD Tools. hook up tool and check connections, Stand back in Derrick 05:30 - 06:00 0.50 DRILL OTHR PROD Hook up Geo Skid connections and safety chains 06:00 - 07:15 1.25 LOG RURD PROD While spotting Schlumberger unit and picking up tools, cont. cleaning OBM from under rotary table 07:15 - 07:30 0.25 LOG SFTY PROD Held PJSM with Schlumberger, Rig crews, and Co. Rep. 07:30 - 08:45 1.25 LOG RURD PROD Rig up wire sheaves, M/U USIT, Gamma Ray and collar locator assembly 08:45 - 09:15 0.50 LOG PULD PROD M/U Tractor assembly on top, Total Length. = 64.3' 09:15 - 09:45 0.50 LOG ELOG PROD RIH with wire Line, Able to free fall to 2175' with wire line 09:45 - 13:00 3.25 LOG ELOG PROD Active Tractor assembly to get wire line down F/2175'- T/3,483'. Taking Wieght made 4 attemps. No Go, 13:00 - 13:15 0.25 LOG ELOG PROD POOH to 2600' 13:15 - 14:30 1.25 LOG ELOG PROD Attempted to Tractor back into hole, second attempt made.. it to 3,121' set down. Taking weight 14:30 - 16:15 1.75 LOG ELOG PROD P.O.O.H UD Tractor assembly Approx. 4 oz fine metal shavings found on collar locator. Change oil in the tractor. From 10wt. to 16 wt. 16:15 - 17:00 0.75 LOG ELOG PROD P/U tractor assembly and RIH T/2400' Good 2,974' set down hard. 6 times, 17:00 - 19:00 2.00 LOG ELOG PROD Able to run tractor and wire line down F/2,974 ' T/3,430' (Test Top Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page>~2o of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005. Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To i Hours ~ Code Code Phase ~ Description of Operations 7/30/2005 17:00 - 19:00 2.00 LOG ELOG PROD Drive) All Working. 19:00 - 20:00 _1.00 LOG ELOG PROD P.O.O.H 20:00 - 20:30 0.50 LOG PULD PROD Break Down Tools and Rig Down Wireline. 20:30 - 20:45 0.25 DRILL PULD PROD Pick Up BHA Stood Back in Derrick and M/U bit. Run in hole. 20:45 - 23:00 2.25 DRILL PULD PROD P/U Load Pulsar in TM H.O.C, Make Up to BHA, Up Load LWD Tools, 23:00 - 23:30 23:30 - 00:00 0.50 DRILL TRIP PROD 0.50 DRILL TRIP PROD /31/2005 00:00 - 00:45 0.75 DRILL TRIP PROD 00:45 - 02:00 1,25 DRILL CIRC PROD 102:00-04:001 2.00 DRILL (TRIP (PROD 04:00 - 05:00 I 1,001 DRILL I PULD I PROD 05:00 - 06:30 1.50 DRILL OTHR PROD 06:30 - 07:30 1.00 DRILL TRIP PROD 07:30 - 11:15 3.75 DRILL TRIP PROD 11:15-12:451 1,50DRILL (TRIP (PROD 12:45-14:30 1,75 DRILL OTHR PROD 14:30 - 18:00 3.50 DRILL DRLH PROD 18:00 - 22:30 I 4.501 DRILL DRLH PROD 22:30 - 00:00 18/1/2005 100:00 - 06:00 1.501 DRILL I DRLH I PROD and Shallow Test Tools. PJSM Load Nuetron and Gamma Sources.. Test Geo Surface Equipment T/3,500psi. Trip Hole Jars and 8 Jts 5"Hwt Drill Pipe, Trip in Hole; 31jts 5" Drill Pipe 8 1/2" ghost Reamer. Continue to Trip in Hole W/5" Drill Pipe Trip in Hole: To 3,055' Fill Pipe: Test Top Drive, Went to Fault, Reset Worked Good 130 RPM backed down Torq ,Until Stopped, Start Back up and function all Controls, Test MWD No Pulse, Cycle Pumps Still Failed.. Trip Out Hole for Directional Assembly Failure. Break Off Top of Pulsar was Clean, PJSM; Remove Nuetron and Gamma Sources, Plug into to tools to trouble shoot Tools Check Out OK, Break Top Of T.M. Collar pull Pulsar Looks Clean, Change Out Pulsar. Plug into LWD Tools and Upload Tools. Pick Up BHA. Trip in Hole, To 2,900' fill pipe, Test MWD, 417 GPM, 1,010' MD. Trip in Hole; To 10,160' fill pipe every 25 stands, Monitior well before going in open hole, Up Wt. 200k,Dn Wt. 88k. Trip in Hole; To 11,300' Establish Circulation at 450 GPM 2430 psi., Up Wt. 210k, Dn Wt. 85k, Rot Wt.130k. Record SPR. Start Troughing F/ 11,300' MD To 11,342' Up wt, 21 k, Dn Wt. 85k, Rot Wt. 130k, 450 GPM, 2,460' psi. Start side track; F/ 11,342'MD, 3,489' ND, Drill T/ 11,619' MD. 3,469' ND, ART-2.44hrs. Bit Hrs.- 2.44hrs., Jar Hrs. 22.26hrs., GPM 525 - 2,680ppsi. On Btm. - 2,660 Off Btm, 17k Torq on Btm, 15k Off Btm. 120 RPM. 10-20 WOB, 230k Up Wt., 80k Dn Wt., 130k Rot Wt.11.0 ECD. DriII Ahead; F/ 11,619'MD, 3,469' ND, Drill T/ 11,887' MD. 3,464' ND, GPM 550-600 - 2970psi.-3,520psi. On Btm. - 2,800psi: 3,460psi. Off Btm, Torq. Off Btm, 17k, Torq on Btm, 20k. 120 RPM. 10-20 WOB, 230k Up Wt.,90k Dn Wt., 140k Rot Wt.11.4 ECD. Drill Ahead; F/ 11,88TMD, 3,464' ND, Drill T/ 12,036' MD. 3,464' ND, ART-4.06 Bit Hrs.- 6.5hrs., Jar Hrs. 26.3hrs., GPM 550-600 - 2970psi.-3,520psi. On Btm. - 2,800psi.-3,460psi. Off Btm, Torq. Off Btm, 17k, Torq on Btm, 20k. 120 RPM. 10-20 WOB, 230k Up Wt.,90k Dn Wt., 140k Rot Wt.11.4 ECD. Note: Drilled Out of Sands Formation ramp up or fracture, True vertical throw Estamate 1T Out at 11,915'MD. 3,465' ND, Back in Sands 12,268'MD, 3,448' ND. 353ff sands lost. 6.00 DRILL DRLH PROD Drill Ahead; F/ 12,036'MD, 3,464' ND, Drill T/ 12,487' MD. 3,440' ND, ART----- Bit Hrs.-10.77hrs., Jar Hrs.26.32hrs., GPM 550-600 - 2970psi.-3,520psi. On Btm. - 2,800psi.-3,460psi. Off Btm, Torq. Off Btm, 17k, Torq on Btm, 20k. 120 RPM. 10-20 WOB, 230k Up Wt.,90k Dn Wt., 140k Rot Wt.11.4 ECD. 12,295' Pumped Sweep 11.ppg, 107 Vis. 40% increase at Shakers of Cuttings. ECD F/11.8, T/ 11.4ppg. Concreations 12,459-12461' (2'), Note: Drilled Out of Sands Formation ramp up or fracture, True Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 21 of =~5 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date ~ From - To I Hours Code Code `Phase Description of Operations 8/1/2005 00:00 - 06:006.00 DRILL DRLH PROD vertical throw Estamate 1T Out at 11 915'MD. 3 465' ND Back in 06:00 - 12:00 6.00 DRILL DRLH PROD 12:00 - 18:00 6.00 DRILL DRLH PROD 18:00 - 00:00 6..00 DRILL DRLH PROD 8/2/2005 00:00 - 07:00 7.00 DRILL DRLH PROD 07:00 - 11:30 4.50 DRILL REAM PROD 11:30 - 13:00 1.50 DRILL REAM. PROD 13:OQ - 14:00 ~ 1.OOJ DRILL TRIP _I PROD 14:00 - 14:45 0.751 DRILL I TRIP I PROD 14:45 - 00:00 9.251 DRILL TRIP PROD 18/3/2005 00:00 - 00:15 0.25 DRILL TRIP PROD 00:15 - 05:30 I 5.251 DRILL I DRLH I PROD Sands 12,268'MD, 3,448' ND. 353ft sands lost. Drill Ahead; F/ 12,487'MD. 3,440'ND. T/ 12,713'MD. 3,436'ND. ART-5.07hrs. Bit Hrs-15.84hrs. GPM-600, W/ 3,420psi. On Btm.-3,400.Off BTM. 120RPM.-18-23 Tq.On Btm.-17-20. Up Wt.-240k,Dn Wt.-70,Rot Wt.-135k. ECD 11.3 ppg. Concreations 12,543'-12,552'(9'), 12,568'-12,580'(12'), 12,624'-12,630'(6'), 12,646'-12,650'(4'), Drill Ahead; F/ 12,713'MD. 3,436'ND. T/ 12,847'MD. 3,433'ND. ART-4.96hrs. Bit Hrs-20.80hrs. GPM-600, W/ 3,420psi. On Btm.-3,400.Off BTM. 120RPM.-18-23 Tq.On Btm.-17-20. Up Wt.-240k,Dn Wt.-70,Rot Wt.-135k. ECD 11.4 ppg. Concreations 12,670'-12,680'(10'), 12,700'-12,708'(8'), 12,712'-12,718'(6'),. 12,743'-12,752'(9'), 12,775'-12,800'(25'), 12;836-12,844'(8') Drill Ahead; F/ 12,847'MD. 3;433'ND. T/ 13,284'MD. 3,429'ND. ART-4.15hrs. Bit Hrs-24.95hrs. GPM-600, W/ 3,500psi. On Btm.-3,480.Off BTM. 120RPM.-19 Tq.On Btm.-20. Up Wt. 240k,Dn Wt.(less then block Wt of 70k),Rot Wt.-130k. ECD 11.6 ppg. APIG- 58ft per hr. 33.5hrs, Footage Drilled 1,942' Average ROP 77' per Hr. Concreations 12,954'-12,985'(9'). DriII Ahead; F/ 13,284'MD. 3,429'ND. T/ 13,879'MD. 3,408'ND. ART-4.20hrs. Bit Hrs-28.75hrs. GPM-600, W/ 3,760psi. On Btm.-3,670.Off BTM. 120RPM.-19 Tq.On Btm.-20. Up Wt.-255k,Dn Wt.(less then block Wt of 70k);Rot Wt.-132k. ECD 12.2 ppg. APIG- 62.64ft per hr. 40.5hrs, Footage Drilled 2,537'. Average ROP 88' per Hr. Back Ream Out Of Hole: From 13,879' To 12,150', 20-25ft per min. 120RPM, 575GPM, 3,320psi. 18-20T0, Back Ream Out Of Hole: From 12,150' To 11,727',Slow Pull Rates To 10-15ft per min. 120RPM, 575GPM, 3;200psi. 18T0, The last 300' Pumped 1200 bbls 2x BTM Up, Trip Out Of Hole: Attempt to Pull pipe with out back reaming, 11,727'-11,536' Hole not taking correct fill Up Wt 220-235, Pumped out. To 11,156'. 500GPM. 2,250 psi. 200k Up Wt. Ghost Reamer 9,690'. Trip in Hole: From 11,156' - 11,628' Up Wt,220, Dn Wt. 85k. Lost Dn Wt. 11,628' Trip in Hole; Pump and Rotate because of loss of down Wieght From 11,628' - 13,879', 11,727' Attempt to run in hole with out Rotating No Down Wt. Check Shot survey to Confirm in Side Track, at 11,622', 11,722', 90RPM 600GPM 3,450 psi.110Rot Dn Wt. Started install of LoTads on Stand # 126 at (12,624'Depth of Lodtad), To Stand # 139 (13,897' Depth of LodTad) Total LodTads Picked Up 14. Total in Hole 69 LodTads. ECD 12 Trip in Hole; Pump and Rotate because of loss of down Wieght From 13,866' - 13,879',.600GPM 3,800 psi120Rot Dn Wt. Started install of LoTads on Stand # 126 at (12,624'Depth of Lodtad), To Stand # 139 (13,897' Depth of LodTad) Total LodTads Picked Up 14. Total in Hole 69 LodTads. ECD 12 Pumped 11 ppg. 120vis sweep. No Increase in returns. Drill Ahead; F/ 13,879'MD. 3,408'ND. T/ 14,196'MD.3,380'ND. ART 3.30hrs. Bit Hrs 32.48hrs. GPM-600, W/ 3,884psi. On Btm.-3,840.Off BTM. 140RPM.-18 Tq.On Btm.-18. Up Wt.-225k,Dn Wt.(less then block Wt of 70k),Rot Wt.-138k. ECD 12.2 ppg. 2,854'. Started with 5" HWDP Printed: 9(30/2005 6:19:05 AM ~ • ConocoPhillips Alaska Page 22 of 45 Operations Summary...:.:Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date > From-- To Hours Code Code Phase 8/3/2005 00:15 - 05:30 I 5.25 DRILL DRLH PROD 05:30 - 06:30. I 1.00 DRILL I DEOT I PROD 06:30 - 09:15 ~ 2.75 ~ DRILL ~ DRLH ~ PROD 09:15 - 09:45 I 0.501 DRILL CIRC I PROD 09:45 - 11:30 I 1.751 DRILL I REAM I PROD 111:30 -12:00 ~ - 0.50 i RIGMNT~ RGRP PROD 12:00 - 17:00 I 5.00 I DRILL I DRLG I PROD 17:00 - 22:15 I 5.251 DRILL I DRLG I PROD 22:15 - 00:00 i 1..751 DRILL I DRLG I PROD 18/4/2005 ~ 00:00 - 01:30 1.501 DRILL I DRLG I PROD 01:30 - 03:30 2.00 DRILL DRLG PROD 03:30 - 13:00 9.50 DRILL REAM PROD 13:00 - 13:30 0.50 DRILL I OBSV PROD 13:30 - 14:30 1.00 DRILL CIRC PROD 14:30 - 18:45 4.25 DRILL TRIP PROD 18:45 - 20:30 1.75 DRILL PULD PROD 20:30 - 20:45 0.25 DRILL CIRC PROD 20:45 - 22:30 1.75 DRILL TRIP PROD 22:30 - 22:45 I 0.251 DRILL I TRIP I PROD 22:45 - 00:00 1.25 DRILL PULD PROD 18/5/2005 00:00 - 02:00. 2.00 DRILL TRIP PROD 02:00 - 03:00 1.00 DRILL PULD PROD 03:00 - 04:45 I 1.751 DRILL I PULD I PROD Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations Stand # 140, 13,965'. Slow R.O.P T/50ft per Hr. From 14,020'-14055' 100-120ft per Hr 14,055' - 14,196' Per Directional Driller. MWD Pulsar and detection problems, Problems down linking to Geo-Pilot. Drill Ahead; F/ 14,196'MD. 3,380'TVD, T/ 14,397'MD.3,364'TVD. ART2.03hrs. Bit Hrs 34.51 hrs. GPM-610, W/ 4,010psi. On Btm.-3,990.Off BTM. 120RPM.-19 Tq.On Btm.-19. Up Wt.-240k,Dn Wt.(less then block Wt of 70k),Rot Wt.-140k. ECD 12.3 ppg. Footage Drilled 3,055' Average ROP 88' per Hr. Motors overheat Pick up off Btm. Slow Pumps and Rotary let motors cool Down. Back Ream Out Hole:From 14,397'MD 3,364'TVD To 13,768'MD 33,412' 600GPM, 3,900psi. 120RPM, Up Wt. 230k Rot WT. 125k, Mode switched LWD tools, Change Liner Out in #2 Pump. Work Pipe Low side, From 13,758'-13,768' Open Hole Side Track: From 13,768'MD 3,412'TVD, @ 13,864' Geo inclination confirmed sidetrack, Drill Ahead From 13,864'MD 3,412TVD To 14,330'MD 3,405' TVD, ART 4.44hrs. Including side track, Bit Hrs.38.95: 614 GPM, 3,780psi. on BTM, 3,750psi. off Btm. 235 Up Wt. W/O pumps, 130k Rot W/O pumps. neg Dn WT. ECD 11.9. Drill Ahead; F/ 14,330'MD. 3,405'TVD. T/ 14,388'MD.3,402'TVD. Total Drilled 58', @ 14,371'MD .Bad Detection on LWD tools, Work with Speny sun on parameters, Mode Change, Check and clean pump suction screens, Screens O.K. Continue trouble shoot pull 1 stand back, Survey @ Drill Ahead; F/ 14,388'MD. 3,405'TVD. T/ 14,397'MD.3,405'TVD. Total Drilled 10", Bad Detection on LWD tools, Work with Speny sun on parameters, Change modes, Stand Back 1 stand HWDP, Pump 450 GPM and Press Up Pulsation dampeners, to 1,000psi. From #1- 800psi, #2 -750psi. Good Detection on LWD tools both modes. Drill Ahead; F/ 14,397'MD. 3,405'TVD. T/ 14,435'MD.3,397'TVD. Total Drilled 38', tools, Work with Sperry Sun on Down link and Geo-Pilot problem. Last Survey @ 14,393 94.49 incl. 180.53 Azm. Back Ream Out Hole: 25-35ft per min. Re -Check, Geo -Tool at 13,658' and at 12,297 - 12,200, Monitor Well, @ 10,367'. Clean Rig Floor. Circulate Btms Up at 10,367', 600 GPM 3,100psi. Press, Worked on Pipe Handler. Trip Out Hole: Pump Dry Job, Pull Out Hole. Pick Up 30 jts. 5" HWT Drill Pipe, T/ 2,632' Circulate 70 Bbls through 5" HWT DP, Pump Dry Job. Trip Out Hole: 10 stands 5" HWT DP,13 Stands 5" DP, UD Ghost Reamer 1/8" under gauge, 3 stands 5" HWT DP and Jars, 1 stand Flex Drill Collars, PJSM; Removing and storing Neutron and gamma Sources, Remove and Store Sources. Down Load LWD Tools. Down Load LWD Tools. Pull Pulsar, P/U 15' Pup to stand Back in Derrick, P/U Break Out Bit, UD Geo Pilot, could not rotate housing, Housing locked up. P/U new Geo pilot (housing turned), Make up Bit, MWD,Install Pulsater in H.O.C. collar Printed: 9/30/2005 6:19:05 AM • C ConocoPhillips Alaska Page 23 of 45 Operations Summary.. Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Dat Fro T Sub Ph H u ' Cod m - e o o rs . e ase Code, 8/5/2005 04:45 - 05:45 1.00 DRILL DEOT PROD 05:45 - 06:30 0.75 RIGMNT RGRP PROD 06:30 - 08:00 .1.50 DRILL DEQT PROD 08:00 - 12:00 4.001 DRILL I TRIP PROD 12:00 - 13:15 1.25 RIGMNT RSRV PROD 13:15 - 14:15 1.00 RIGMNT RSRV PROD 14:15 - 15:15 1.00 DRILL TRIP PROD 15:15 - 16:15 1.00 DRILL REAM PROD 16:15 - 19:00 2.75 DRILL TRIP PROD 19:00 - 20:00 20:00 - 00:00 8/6/2005 00:00 - 02:45 02:45 - 03:45 03:45 - 05:00 1.00 i DRILL REAM I PROD 4.001 DRILL I DRLH I PROD 2.751 DRILL I DRLH I PROD 1.001 DRILL I REAM I PROD 1.251 DRILL I DRLH I PROD 05:00 - 06:00 1.00 DRILL REAM PROD 06:00 - 08:00 2.00 DRILL REAM PROD 08:00 - 09:00 1.00 DRILL TRIP PROD 09:00 - 09:30 0.50 DRILL REAM PROD 09:30 - 12:00 2.50 DRILL DRLG PROD 12:00 - 12:30 0.501 RIGMNTI RGRP I PROD Spud. Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations Up Load and test & Test MWD. Trouble Shoot Top Drive fault. Shallow test MWD Tools, PJSM on Install of Nuetron and gamma sources, Install sources, Pick up BHA. Trip in Hole: Fill pipe every 25 stands to 10,370' MD, 175k Up Wt. 95 Dn Wt. Cut and slip Drill line 104', Inspect Brakes Service Rig, Adjust Compensator. Trip in Hole: From 10,370'to 11,612'MD Up Wt 190k, Dn Wt. 90k. Make Up Top Drive, Wash and ream From 11,612'MD, to 12,013'MD. Trip in Hole: Fill Pipe every 10 stands, 12,013'- 14,241' {13,180' Up Wt. 200k Dn Wt 100k, 14,148' Up Wt. 205k Dn Wt. 100k. 14,148'. Up Wt. 205k Dn Wt.100k.} Check Shot Survey new hole Confirmed. Wash and Ream: From 14,148'to 14,435'MD 3,39TTVD. 230 Up Wt. 100 Dn Wt, Drill Ahead; F/ 14,435'MD. 3,397'TVD. T/ 14,610' MD. 3,386'TVD. ART2.46hrs. Bit Hrs2.46hrs. GPM-600, W/ 4,200psi. On Btm.-4,120.Off BTM. 120RPM.-20 Tq.On Btm.-19. Up Wt.-250k,Dn Wt.-85,Rot Wt.-155k. ECD 11.9 ppg. No Concretions, APIG,43.75 Average ROP 71' hr. Drill Ahead; F/ 14,610'MD. 3,397'TVD. T/ 15,065' MD. 3,379'TVD. 1.76ARThrs. Bit Hrs 4.22hrs. GPM-600, W/ 4,200psi. On Btm.-4,120.Off BTM. 120RPM.-20 Tq.On Btm.-19. Up Wt.-250k,Dn Wt: 85,Rot Wt.-155k. ECD 11.9 ppg. No Concretions, APIG,43.75 Average ROP 71' hr. ChargePump Pulsater Dampners T/ 1,400psi. Loss signal, No Pulse Back Ream Out 3 stands Hwt Drill Pipe, replace with 5" drill Pipe, Trip Drill Pipe back in hole on Elevators, Down Wt 90k, 240 Up Wt. Drill Ahead: F/ 15,065 MD, T/ 15,078'MD, TVD 140 Up Wt. 90 Dn Wt. 152k Rot Wt. Tried One pump @ 430 GPM 2,700psi.signal but to dirty to read, Bumped Up Pulsater T/ 1,500 #2 Pump. No Change, Raised GPM T/630 4,350 psi. Pulse signal Drill Kelly down Make Connection lost signal. @ same Rate, Total hrs on bit @ 15078' = 4.69 hrs. Back Ream Out of Hole f/ 15078' T/14610'. Will replace HWDP w/ 5" DP w/o Lo-tads. Continue back Ream Out of Hole f/ 14610' T/13,868. All HWDP out of hole on pipe rack. RIH on elevators, replacing 5" HWT Drill Pipe W/ 5" Drill Pipe (no lo-tads). RIH f/ 13868' to 15014'. Fill pipe, test Sperry Sun MWD/LWD and Sperry Sun geopilot, OK. Take SPR's. Wash and ream f/ 15014' to 15078'. Directional drill 8 1/2" hole f/ 15078' to 15135' (3378.5' TVD) (57') ART 1.91 hrs w/ Speny Sun geo pilot, 6-7k WOB, 120 rpm's, 600 gpm, 9.0-9.1 ppg mw, on bottom pressure 4010 psi, off bottom pressure 3960 psi, on bottom torque 19k ft/Ib, off bottom torque 18k ft/Ib, PU wt 240k, SO wt 75k, Rot wt 130k. Note: Poor detection, intermittent MWD/LWD data Total bit hrs 6.6 Work on #1 mud pump. Replace liner and swab. Liner gasket was leaking earlier, liner gasket was changed earlier. Back reamed +/- 30' of a stand, set stand back, backream slow w/ circ @ reduced rate w/ #2 mud pump, while working on #1 pump. Printed: 9/30!2005 6:19:05 AM • • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Sub' • Date From - To Hours. Code ..Phase. Code 8/6/2005 ~ 12:30 - 14:30 ~ 2.00 DRILL DRLG PROD 14:30 - 18:00 I 3.501 DRILL DRLG PROD 18/7/2005 18:00 - 00:00 I 6.00 I DRILL DRLG PROD 00:00 - 02:30 I 2.501 DRILL ~ DRLH I PROD 02:30 - 02:45 0.251 DRILL I CIRC PROD 02:45 - 06:30 3.75 DRILL REAM PROD 06:30 - 07:45 1.25 RIGMNT RGRP PROD 07:45 - 10:45 3.00 DRILL REAM PROD 10:45 - 12:45 2.00 DRILL REAM PROD 12:45 - 15:15 I 2.50 I DRILL I REAM I PROD 15:15 - 17:00 1.75 DRILL CIRC PROD Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Page 24 of 45' Spud Date: 6/26/2005 End: 9/10/2005 Group: Description of Operations Directional drill 8 1/2" hole f/ 15135' to 15202' (3378' TVD) (67') ART 1.33 hrs w/ Sperry Sun geo pilot, 25k WOB, 120 rpm's, 610 gpm, 9.0-9.1 ppg mw, on bottom pressure 4080 psi, off bottom pressure 3990 psi, on bottom torque 19k ft/Ib, off bottom torque 19.5k ft/Ib, PU wt 230k, SO wt 70k, Rot wt 130k. Note: 15202' is the last of 5" drill pipe slick drilled down. Next will be 5" HWDP. Total hours on bit 7.93 hrs Note: MWD/LWD/PWD working ok, so far. Directional drill 8 1/2" hole f/ 15202' to 15,297' (3,377' TVD) ART 2.60 hrs w/ Sperry Sun geo pilot, 20-25k WOB, 120 rpm's, 600 gpm, 9.0-9.1 ppg mw, on bottom pressure 3,940 psi, off bottom pressure 3,920 psi, on bottom torque 19k ft/Ib, off bottom torque 19k ft/Ib, PU wt 230k, Dn Wt. none ,Rot wt 138k. Note:Drilling W/ 5" HWDP. Lost detection 1530 hrs @ 15261' MD/ 3370' TVD, cylcled pumps and came on. Lost Detection on and off. MAD Pass 15,297' - 15,290' lost detection. Directional drill 8 1/2" hole From 15,297' to 15,727' (3,370' TVD) ART2.13 hrs w/ Sperry Sun geo pilot, 20-25k WOB, 120 rpm's, 600 gpm, 9.0-9.1 ppg mw, on bottom pressure 3,940 psi, off bottom pressure 3,920 psi, on bottom torque 19k ft/Ib, off bottom torque 19k ft/Ib, PU wt 230k, Dn Wt. none ,Rot wt 138k. Note: #1 Pump 100strks - #2 38strks'. When detection lost send downlink to start back up, Drilling Ahead, Making mad Passes on Log area needed for Geoligist. 430' Footage Drilled, Out of A2 sands 15,440' Back in sands @ 15,730' Pumped 10.9 130 vis sweep 40 bbls @ 15,674'. seen sweep no increase of cuttings. Directional drill 8 1/2" hole From 15,727' to T.D.@15,940' (3,354' TVD). ART1.22 hrs. 14.46 Bit Hrs. w/ Sperry Sun geo pilot, 20-25k WOB, 120 rpm's, 580 gpm, 9.0-9.1 ppg mw, on bottom pressure 3,929' psi, off bottom pressure 3,910 psi, on bottom torque 19-20k ft/Ib, off bottom torque 19k ft/Ib, PU wt 240k, Dn Wt. none ,Rot wt 145k. Note: When detection lost send downlink to start back up Detection instead of restarting pump, Drilling Ahead, Making mad Passes on Log area needed for Geoligist that missed on detection. 213' Footage Drilled, Note: Drilled out of A2 sands Base 15,440'MD, 3,377'TVD, Back in sands 15,730'MD,3,370TVD. lost sands 290'. Ciculate, Survey @ T.D. 15,940'MD. 3,354' TVD. 93.64incl: 182.97AZM. Slow Pump rates. Back Ream Out Hole; F/ 15,940' T/ 13,871', 600GPM . 3,750'psi. Pull 25-30' per min. Running Speed. S pipe leaking on Top Drive, Tighten up, pressure up still leaking, R/U to circiulate,Break pipe free no Down Wieght, Circ, While Change out seal on Union, Lay Down Three jt, to keep LodTads in wind Wall area. Back Ream Out Hole: F/ 13,773' T/ 12,686', 600GPM . 3,740'psi. Pull 25-30' per min. Running Speed. Back Ream Out Hole: F/ 12,686' T/ 11,632', 447GPM . 1,830'psi. Pull 15-20' per min. Running Speed. Shut in #2 Pump, Shock Hose leaking, Continue backreaming slower rate. Back Ream Out Hole: F/ 11,632' T/ 10,167', 600GPM . 3,740'psi. Pull 25-30' per min. Running Speed. #2 Pump Back On Line Pump and pull at full rate. Pump High Wieghted,Vis Sweep - 120RPM - 600GPM - 3,151 psi. Rotate and Recipacate pipe 2 Btms Up 1211 bbs, Printed: 9/30!2005 6:19:05 AM • • ConocoPhillips Alaska Page 25 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To i Hours I Code' Code Phase 8/7/2005 17:00 - 17:30 0.50 RIGMNT RSRV PROD 17:30 - 21:45 4.25 DRILL. TRIP PROD 21:45 - 22:00 0.25 DRILL REAM PROD 22:00 - 00:00 2.00 DRILL CIRC PROD 18/8/2005 100:00 - 01:00 I 1.001 DRILL I CIRC I PROD 01:00 - 03:00 ~ 2.00 I DRILL I CIRC ~ PROD 03:00 - 03:15 0.251 DRILL OBSV PROD 03:15 - 06:00 2.75 DRILL TRIP PROD 06:00 - 06:45 0.75 DRILL TRIP PROD 06:45 - 08:15 1.50 LOG DLOG PROD 08:15 - 09:00 0.75 DRILL TRIP PROD 09:00 - 11:15 2.25 LOG DLOG PROD 11:15 - 14:00 2.75 DRILL TRIP PROD 14:00 - 16:30 2.50 DRILL TRIP PROD 16:30 - 17:30 1.00 DRILL TRIP PROD 17:30 - 18:45 1.25 DRILL TRIP PROD 18:45 - 19:15 0.50 DRILL OTHR PROD 19:15 - 19:30 0.25 LOG SFTY CMPLTN 19:30 - 21:30 2.00 LOG RURD CMPLTN 21:30 - 00:00 2.50 LOG FLOG CMPLTN 18/9!2005 100:00 - 02:00 I 2.00 I LOG ~ FLOG ~ CMPLTN 02:00 - 04:00 2.00 LOG FLOG CMPLTN 04:00 - 06:00 2.00 LOG FLOG CMPLTN 06:00 - 10:00 4.00 LOG FLOG CMPLTN 10:00-12:00 2.00 LOG . FLOG CMPLTN 12:00- 13:30 1.50 .LOG FLOG CMPLTN Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations Service Rig, Monitior Well Trip in Hole: From 10,167' To 15,851' Fill every 10 stands 200k Up Wt, 95 Dn Wt. Had 95-100 Dn Wt all the way in Hole. Wash and Ream F/ 15,831' - T/ 15,940' Circulate; 600 GPM 4050 psi. @ 15,940' Getting Trucks with Solids Free OBM loaded up and all OLD O.B.M out of Pits. Trucks not lined up slow circ rate and rotary after Btms Up. Wait On Trucks. Circulate; Getting Trucks with Solids Free OBM loaded up and all OLD O.B.M out of Pits. Trucks not lined up slow circ rate and rotary after Btms Up. Wait On Trucks. Pump Sweep 40bbls, 100bb1s OBM, Followed By Solids Free OBM, Old OBM: While Pumping and Rotate and Recipacation 138 Up Wt.129 Dn Wt. 120 RPM Torque 19k, 600 Gpm, 4,100psi. Solids Free OBM around: Up Wt.143k, DnWt; 135k, 120 RPM, Torque 23-24k, 600 Gpm, 4,100 Psi. Total Strks Solids Free Mud To surface 11,200 Strks, Calculated 10,557 strks, 7 % over Calculated. Monitior Well, Slow Pump Rates, Pull 1 stand watch hole for swab. PU wt 240k, SO wt -no down wt. Trip Out Hole on elevators: F/ 15,831' - 11153' Trip Out Hole on elevators: F/ 11153' - 9900' Sperry Sun LWD MAD pass West sak "B" sands, log 9900' MD to 9700' MD/ 3353' TVD-3319' TVD. Log @ 200 ft/hr or less. Gamma Ray is 38' behind bit depth. Continue POOH f/ 9700' to 8713'. Sperry Sun LWD MAD pass West sak K13 marker, log 8713' MD to 8432" MD/ 3129' TVD-3057' TVD. Log @ 200 ft hr or less. Gamma Ray is 38' behind bit depth. Continue POOH f/ 8432' to 1376', L/D Ghost reamer. Continue POOH f/ 1376' to 1376', UD Ghost reamer. Stand back dp,stand back HWDP & jas, retrieved 2.33": rabit on top of jars, Stand back flex collars. PJSM, remove nuke sources. Download MWD/ LWD. UD BHA, break and grade bit. Clear and clean rig floor. PJSM; Sclumberger RU Schlumberger. and P/U Tools Run in Hole with wire line tools for USIT Lag. Free Fali TI 2,500' start tracktering, 5,300' @ Midnight. Run in Hole with wire line tools for USIT Log. 5,300' - 6,600' @ 02;OOhrs 650' a Hr. Run in Hole with wireline tools for USIT log, 6,600' - 7,390' @ 04;OOhrs 395'/ Hr. Run in Hole with wireline tools for USIT log, 7,390'- 8,300' @ 06;OOhrs 455'/Hr. Run in Hole with wireline tools for USIT log, using Schlumberger tractor.RlH f/ 8300'- 9284' Tractor not able to get tools deeper than 9284'. Tool string 87.6' long (SON, USIT, centralizer, (2) knucle jts, 5 1/2" rollers GR, Telemtry, 5 1/2" rollers, adapter, Tractor, adapter, swivel, logging wireline head. Log cement job on 9 5/8: casing f/ 9284' to 4900'. Top of good cement @ 5910'. Log f/ hole in 9 5/8" in tie back area of 9 5/8" casing t/ 4900' to 4800'. POOH to 2500'. Printed: 9/30/2005 6a 9:o5 AM • ~i ConocoPhillips Alaska Page 2G of a5< Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: ROT -D RILLIN G Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM @conoc ophillip s.com Rig Release: 9/10(2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date i From - To Hours ' Code Code i Phase Description of Operations 8/9/2005 13:30 - 15:30 2.00 LOG ELOG CMPLTN Log for casing wear in 9 5/8" casing f/ 2500' to 1500'. POOH. 15:30 - 16:30 1.00 LOG ELOG CMPLTN R/D Schlumbrger, UD tools, clear rig floor. 16:30 - 17:00 0.50 WELCT OTHR CMPLTN Drain stack, pull Vetco/Gray wear bushing. 17:00 - 17:30 0.50 WELCT OTHR CMPLTN RU BOP test equipment. 17:30 - 21:45 4.25 WELCT ROPE CMPLTN Test BOPE. Weekly test waived by AOGCC inspector Jeff Jones. Tested all componets to 250 psi low and 3000 psi high. Held each test 5 min each. Tested accumulator,2950 psi full charge, bled down to 1400, 52 sec f/ 200 psi build up, 3 min 59 sec full charge 21:45 - 22:45 1.00 WELCT OTHR CMPLTN Pull test plug. Set wear Vetco/Gray wear bushing (3.18' long, 9" ID). Blow down kill and choke lines and choke manifold. 22:45 - 00:00 1.25 CMPLTN RURD CMPLTN RU to run 5.5", 15.5 #/ft, L-80, BTC-mod liner f/A2 lateral. Blanks and slots. 8/10/2005 00:00 - 00:30 0.50 CMPLTN SFTY CMPLTN PJSM on running 5.5", 15.5 #/ft, L-80, BTC liner (slots and blanks). 00:30 - 06:00 5.50 CMPLTN RUNT CMPLTN- Ran Weatherford float shoe, one blank jt, (1)slotted w/.insert P/O bushing, (1) slot, (9) blanks, (73) slots, (10) blanks, (6) slots, (9) blanks, (12) slots, (5) blanks, (2) slots, (12) blanks w/ seal rings installed, pup jt, x-o, 190-47 casing seal bore ext, x-o, Baker flexlock liner hanger, "RS" packoff seal nipple, "HRD" ZXP liner top packer, running tool. Ran total of (8) easy solutions swell packers 7.98" OD. Install Weatherford 5.5" x 8.25" spiralgliders on all joints other than jts w/ swell packers and shoe jt, total ran 132 spiralgliders. PU wt 115k, SO wt 85-90k, Blocks 70k. Liner length 6048.46' + Baker running tool 12.72'= 6061.18'. 46 joints blank = 1974.81' + 95 jts slotted 4020.39' = 5995.2' PU wt 115k, SO wt 85-90k, blocks 70k. 06:00 - 09:45 3.75 CMPLTN TRIP CMPLTN RIH w/liner on 44 stands of 5" dp w/ LoTads. SLM. Record PU & SO wt's every 10 stands in casing. 09:45 - 11:30 1.75 CMPLTN TRIP CMPLTN With liner @ 9 5/8" shoe, 30 rpm: torque 10K w/ PU wt of 145k, 8500 ft/Ib down wt of 125k, Rot wt 130k w/ 9k ft/ Ib torque. With liner @ 9 5/8" shoe, 15 rpm: torque 8k w/ PU wt of 145k, Sk fUlb down wt of 105k, Rot wt 130k w/ 8.5k ft/Ib torque. PU wt not rotating 170k, SO wt not rotating 110k 11:30 - 12:30 1.00 CMPLTN TRIP CMPLTN Continue RIH w/ liner in open hole to 12500' (66 stands total of5" dp, 55 stands 5" dp w /LoTads + 13 stands slick 5" dp. 12:30 - 14:30 2.00 CMPLTN TRIP CMPLTN Continue RIH w/ liner in open hole f/ 12730' to 15940' (66 stands total of 5" dp, 55 stands w /LoTads + 13 stands 5" dp slick + 14 stands 5" dp w/ LoTads + 20 stands 5" HWDP (first 10 stands Weatherford pipe, last 10 stands Doyon pipe). Fill pipe and circ down last stand @ 3bpm w/ 270 psi. Tag bottom. SO wt 110k, PU wt 265k. 14:30.- 15:00 0.50 CMPLTN PCKR CMPLTN POOH f/ 15940' to 15919' (Top of "HRD" ZXP liner top packer @ 9870.46') 15:00 - 16:00 1.00 CMPLT PCKR CMPLTN Drop 1 7/16" ball. Circ ball down @ 5 bpm w/ 500 psi. Slow down to 3.5 bpm w/ 110 bbls pumped. Ball landed @ 136 bbls pumped (1350 strokes). Pressure to 2000 psi to set hanger. Slacked off 30k on slips. Increase pressure to 3000 psi to shear pusher tool. Increased pressure to 3300 psi and saw presure drop. Pressure continued to drop with slight returns in annulus. 16:00 - 16:15 0.25 CMPLTN PCKR CMPLTN PU to 220k to check to see if released. Did not think released. 16:15 - 16:30 0.25 CMPLTN PCKR CMPLTN Apply left hand rotation f/ safety release f/ liner. PU wt was 240k. Exposed dog sub. Set down 70k wt on ZXP packer 3 times. Rotate 70k on top of packer w/ dog sub. 16:30 - 18:00 1.50 CMPLTN TRIP CMPLTN POOH to 9670', verify pump pressure. 30 spm (3bpm) = 150 psi. Continue POOH f/ 9670' to 6964' 18:00 - 21:30 3.50 CMPLTN TRIP CMPLTN Continue POOH w/ Baker running tools f/ 6964' to surface. Calc fill 95.5 Printed: 9/30/2005 6:19:OSAM • • ConocoPhillips,A!aska Operations Summary. Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -'DRILLING Contractor Name: D15CM@conocophillip s.com Rig Name: Doyon 15 Date From - To Hours Code Sub 'Code ~ Phase ! 8/10/2005 -- 18:00 - 21:30 - 3.50 -- CMPLT TRIP CMPLTN 21:30 - 22:00 0.50 CMPLTN PULD CMPLTN 22:00 - 22:30 0.50 WINDO ULD CMPLTN 22:30 - 22:45 0.25 WINDO SFTY PROD2 22:45-23:15 0.50 WINDO .ULD PROD2 23:15 - 00:00 0.75 WINDO ULD PROD2 18/11/2005 100:00 - 00:45 I 0.751 WINDOVIIPULD PROD2 00:45 - 02:00 1.25 WINDO OTHR PROD2 02:00 - 03:15 1.25 WINDO OTHR PROD2 03:15 - 04:00 0.75 WINDOV'IIOTHR PROD2 04:00 - 06:00 2.00 WINDO TRIP PROD2 06:00 - 08:00 I 2.001 WINDOV'VTRIP I PROD2 08:00 - 09:00 I 1.001 WINDOV'VOTHR I PROD2 09:00 - 10:00 1.00 WINDO OTHR PROD2 10:00 - 11:30 1.50 WINDO OTHR PROD2 11:30 - 12:30 1.00 WINDO RIP PROD2 12:30 - 13:00 0.50 WINDO SFTY PROD2 13:00 - 15:00 2.00 WINDO RIP PROD2 15:00 - 16:30 1.50 WINDO RIP PROD2 16:30 - 17:30 1.00 WINDO ULD PROD2 17:30 - 18:00 0.50 WINDO OTHR PROD2 18:00 - 18:30 0.50 RIGMNT RSRV PROD2 18:30 - 20:00 1.50 FISH PULD PROD2 22:105 - 22:45 I 0.50! FISH ~ F SIH I PROD2 22:45 - 23:00 I 0.251 FISH FISH PROD2 Page 27 of 45 Spud Date: 6/26/2005 .Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations' bbls, actual fill 120.1bbls, 24.6 bbls over. Made service breaks and UD Baker liner running tools. Break down stand of 5" HWDP f/derrick to use in whipstock assembly. Measure joints. PJSM on PU and running Baker whipstock assembly. Pick tools to rig floor. PU/MU Whipstock assembly. Baker 8" Window mill, 8" Lower mill, Flex joint, 8.5" upper mill, (1) joint 5" HWDP, float sub, MWD. PU/MU Whipstock assembly. Baker 8" Window mill, 8" Lower mill, Flex joint, 8.5" upper mill, (1)joint 5" HWDP, float sub, MWD. Upload Speery Sun MWD, shallow test tools., check orientation of mills and MWD, stand back MWD & mills. PU whipstock assembly, bolt together. Whipstock assembly: Seal assembly w/ bull nose, stop sub (8.5" OD), unloader sub, (1) jt 5" HWDP, (2) 5" pup joints, blanking sub, bottom trip anchor, safety disconnect, ported drain sub, debris sub, Windowmaster shipstock, window mill, lower mill, (1) joint HWDP, float sub, Sperry sun telemetry module, Speny sun memory module, sperry sun Gamma ,Sperry sun DM MU Baker/ Bowen bumper sub. 2 stands 5" HWDP Trip in hole w/ Baker Windowmaster system using 5" DP w/ LO-Tads ,SLM, running speed 2 min/stand f/ 384' to 2856'. Fill pipe. Trip in hole w/ Baker Windowmaster system using 5" DP w/ Lo-Tads, SLM, running speed 2 min/stand f/ 2856' to 4844'. PU wt 170k, SO wt 90K. Note: on Hi-line power @ 0830 hrs. Set down @ 4844' (45 stands +10'). Check string weight. Check location of assembly in relation to 9 5/8" Tie-Back Note: 4844'MD = 2268.5 TVD, 77.67 deg inclination, 174.79 azimuth, 1.31 deg dogleg. Check casing profiles, logs and options. MU top drive, work string. Rotate ! 15 rpm, up and down, rotate up watching torque (7-10k ft/Ib), Rotate/PU slow. POOH to check whipstock assembly. 12 stands out. Quarterly Safety Assessment w/ Doyon, CPAI and rig crew. ,Continue POOH w/Baker whipstock. Set back 2 stands 5" HWDP. Work BHA f/ whipstock. Drain stack. Pull through stack slow. NO Whipstock. UD Sperry Sun MWD, UD (1) HWDP, UD Baker mills. Clear rig floor of tools. Service rig and top drive. PU tools to fish whipstock. MU BHA: Baker retieving hook , (1) 5" HWDP, float sub, 6.25" Bowen, 6.25" Oil Jar, (5) stands 5" HWDP. (Total length of BHA = 523.86') RIH w/ 5" DP w/ LoTads to fish whipstock. Run 42 stands. MU top drive on stand 43, strap 5' going in hole, to locate slot in whipstock w/ retrieving tool. Apply torque to drill string and rotate. Found top of whipstock @ 78.4' in and keyhole @ 84.7' in on stand 43. PU wt 135k, SO wt 100k PU 60-65kk over (210k) to release bottom trip anchor. Note: next daay recoved whipstock. Whipstock had signs of retieving tool @ slot had jumped off, anchor did not release. Pulled anchor loose next trip. Printed: 9/30!2005 6:19:05 AM • ConocoPhillips'Alaska Page 28 of 45 Operatians`'Summary_Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date .From - To Notars Code' Code Phase 8/11/2005 123:00 - 00:00 I 1:00 ~ FISH TRIP PROD2 18/12/2005 100:00 - 02:30 2.501 FISH TRIP I PROD2 02:30 - 03:00 0.50 FISH TRIP PROD2 03:00 - 04:45 1.75 FISH OTHR PROD2 04:45 - 05:00 0.25 FISH TRIP PROD2 05:00 - 06:30 1.501 FISH TRIP I PROD2 06:30 - 07:45 I 1.251 FISH I FISH I PROD2 07:45 - 11:00 I 3.251 FISH I TRIP PROD2 11:00 - 11:30 I 0.501 FISH (TRIP PROD2 11:30 - 13:30 I 2.00 I FISH., I PULD I PROD2 13:30 - 14;00 I 0.50 FISH ~ OTHR PROD2 14:00 - 16:45 2.75 WINDO ULD PROD2 16:45 - 18:00 I 1.251 WINDOV'VPULD I PROD2 18:00 - 18:45 0.75 WINDO ULD PROD2 18:45 - 19:30 0.75 WINDO ULD PROD2 19:30 - 20:15 0.75 WINDO ULD PROD2 Spud Date: 6/26/2005 Start: 6/22/2005 End:. 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 I Description of Operations .POOH slow w/ whipstock assembly FISH f/ 4762' to 3490' (Window Master Whipstock, debris sub w/ 9.625" barrier cup, ported drain sub, safety disconnect sub, 9 5/8" bottom trip anchor, blanking sub, 14.68' 5" pup jt, 9.48' 5" pup joint, (1) joint 5" HWDP, unloader sub, 8.5" OD stop sub, 7 7/16" OD Seal assembly w/ bull nose) Note: no fish recovered POOH slow w/ whipstock assembly f/ 3490' to 524' FISH (Window Master Whipstock, debris sub w/ 9.625" barrier cup, ported drain sub, safety disconnect sub, 9 5/8" bottom trip anchor, blanking sub, 14.68' S" pupjt, 9.48' 5" pup joint, (1) joint 5" HWDP, unloader sub, 8.5" OD stop sub, 7 7/16" OD Seal assembly w/ bull nose) Stand back 5 stands 5" HWDP, L/D Oil jars, bumper jars and float sub. PU & Inspect Baker retrieving hook; whipstock assembly not recovered; signs of contact on top edge of retrieving tool. L/D Baker hook, PU/MU Baker box tap (rolling dog sub), MU same. Trip in hole w/ whipstock retrieving tool (Box Tap) on (1) jt 5" HWDP, float sub, 6.25" Bowen bumper sub, 6.25" Bowen Oil jar, (5) stands 5" HWDP. Trip in hole w/ fishing BHA to latch whipstock. RIH w/ 5" dp w/ Lo-Tads f/ 520' to 4756', run a total of 42 stands 5" dp w/ to-Tads, MU top drive on stand 43 and 5' strap in. Tag @ 4756.74'. (82.5' on stand 43) Note: PU wt 132k, SO wt 100k, Rot wt 115k, rot torque 5-7k ft/Ib. Engage fish (top of whipstock), PU 3' w/ 145k PU wt, SO, apply turns- watching torque-max 9k ft/Ib. Let jars bleed W/ PU wt of 170k, final of 140k, PU to 160k, 170k, 185k, 205k, 210k anchor released. Pull up hole w/ 140-145k PU wt. Slack off to tag up again; but went past stop point. Slack off to 10' past (4766'). PU again wl 140-143k past stop point, slack off and tagged up this time (Indication of still having whipstock fish assembly). POOH slow w/ fish (Whipstock window master assembly). Pull 50-60 ft/min. Stand back (5) stands 5"HWDP, Lay down bumper sub; jars and float sub. Pull (1) joint 5" HWDP and box tap w/ whipstock assembly(fish). L/D Fish consisting of: Whipstock, debris sub, ported drain sub, safety disconnect, bottom trip anchor, blanking sub, 5" pup joint 14.68' long, 5" pup joint 9.48" long, one joint 5" HWDP, unloader, 8.5" OD stop sub, 7-7/16" OD seals w/ bull nose. Total length 94.21'+ seals below stop. Clear rig floor of unneccessary tools. PU/MU Whipstock assembly #2. PU/MU Debris sub, ported drain sub, safety disconnect, bottom trip anchor, blaking sub. L/D same to pipe shed. PU/MU MWD assembly: 8" window starting mill, 8" lower mill, flex joint, 8.51" upper mill, (1) joint 5" HWDP float sub, Sperry Sun directional probe, Sperry Sun MWD/LWD, Sperry Sun telemetry module. Up load Speny Sun MWD, shallow test @ 505 gpm w/ 640 psi. Stand back MWD assembly. PU whipstock, MU whipstock. Attatch mills and MWD to whipstock. Check orientation. MU bumper sub, PU (3) 6 3/4" spiral drill collars. Rabbit w/ 2 3/8" drift before Picking up DC's. Trip in (2) stands 5" HWDP. Whipstock. assembly consists of: Seals, stop sub, unloader (1) jt 5" HWDP, 9.48' long 5" pup jt, 14.68° long 5" pup jt, blanking sub, bottom trip anchor, Printed: 9/30/2005 6:19:05 AM • • ConocoPhiltips Alaska> Page 29 of 45 Qperations Summary Report Legal Well Name: 1 E-170 Common W ell Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: ROT -D RILLIN G Start: 6/22/2005 End:. 9/10/2005 Contractor Name: D15CM @conoc ophillip s.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 1 5 Rig Number: 15 Date 'From - To ~ Hours I ~ Code , .Sub Code ~'' Phase , ~ Description of Operations 8/12/2005 19:30 - 20:15 0.75 WINDO ULD PROD2 safety disconnect, ported drain sub, debris sub, Whipstock, 8" starter mill, 8" lower mill, flexjoint, 8.51" upper mill, (1) joint 5" HWDP, float sub, Sperry Sun irectional, Sperry sun LWD, Sperry sun telementry module, Bown bumper sub, (3) 6 3/4" Spiral DC's, (2 stands) 5" HWDP. Follow w/ 5" drill pipe w! Lo-Tads 20:15 - 00:00 3.75 W INDO RIP PROD2 RIH in hole slow w/ Whipstock on 5" drill pipe w/ Lo-Tads f/ 477' to 2949', fill pipe, RIH w/ 5" drill pipe w/ Lo-Tads f/ 2949' to 4927'. 8/13/2005 00:00 - 04:45 4.75 WINDO RIP PROD2 RIH in hole slow w/ Whipstock on 5"drill pipe w/ Lo-Tads f/ 4927'- 8857.72' 04:45 - 06:30 1.75 WINDO OTHR PROD2 MAD pass log f/ 8857.72' to 9061'. Pumping 600 gpm w/ 2875 psi. Logging @ less than 300 ft/min 06:30 - 08:30 2.00 W INDO RIP PROD2 RIH in hole slow w/ Whipstock on 5"drill pipe w/ Lo-Tads f/ 9061' to 9820'. PU wt 220k, SO wt 115k - 08:30 - 09:30 1:00 WfNDO SETW PROD2 Orient whipstock. Set whipstock top 9776.6' w/ top of window @ 9778'. Set 24 deg Left of high side. PU wt 210k, SO wt 102k. 09:30 - 09:45 0.25 WINDO SFTY PROD2 PJSM w/ crew and AES vac truck operators, mud engr. 09:45 - 11:30 1.75 WINDO CIRC PROD2 Displace well f/ 9.0 ppg Solids free oil base mud to 9.0 ppg Mineral oil base mud. Displace @ 505 gpm w/ 2545 psi. 11:30 - 14:20 2.83 WINDO STWP PROD2 Start milling window f/ "B" lateral @ 9778.5' to 9794.5' (16'). 75-105 RPM, torque 13-19k ft/Ib. Pump 505 gpm w/ 2550 psi. PU wt 220k, SO wt 115k, Rot wt 160k.Top of window @ 9778.5'/ 3331'TVD. Bottom of window @ 9794.5'/ 3334' TVD. 14:20 - 18:00 3.67 WINDO STWP PROD2 Continue milling window f/ 9794' to 9803' (9'). PU wt 220k, SO wt 115k, Rot wt 160k, 95rpm, 19-13k ft/Ibs on bottom, 12-13k ft/Ib off bottom torque, 505 gpm w/ 2680 psi. 18:00 - 00:00 6.00 WINDO STWP PROD2 Continue milling window f/ 9803' to 9808 (5') ND = 3336'. PU wt 220k, SO wt 115k, Rot wt 160k, 105-120rpm, 14-17k ft/Ibs on bottom, 12-13k ft/Ib off bottom torque, 505 gpm w/ 2680 psi. Weight on mill 25k. Pumped 30 bbls weighted Hi-Vis sweep @ 2230 hrs (9807'), no improvement in milling ROP. Note: This section of hole was slow drilling in 12 1/4" hole section. 9810' starter mill depth, rate gets better. Starter mill to upper mill = 19.34' 8/14/2005 00:00 - 06:00 6.00 WINDO STWP PROD2 Continue milling window f/ 9808' to 9818 (10') TVD = 3337'. PU wt 220k, SO wt 115k, Rot wt 160k, 105-120rpm, 14-17k ft/Ibs on bottom, 12-13k ft/Ib off bottom torque, 505 gpm w/ 2680 psi. Weight on mill 25-30k. Note: "B" lateral window: 9778.5' to 9794.5' MD (3331' TVD-3334' TVD) 06:00 - 08:00 2.00 WINDO CIRC PROD2 Pump 30 bbls weighted (2ppg over =11.0 ppg) Hi-Vis sweep @ 520 gpm w/ 2580 psi. Circ to surface + a bottoms up (12,000 strokes, 1208 bbls). 08:00 - 08:30 0.50 WINDO OTHR PROD2 Work through window several times. No Problems. PU wt 220k, SO wt 140k. TD of starter mill w/ no compression is 9818' (3337 TVD), full 8.5" guage mill 4.76' outside of window. PU to 9756', stand a stand back 08:30 - 10:00 1.50 RIGMNT RSRV PROD2 Slip and cut drilling line, adjust brakes. 10:00 - 10:30 0.50 WINDO CIRC PROD2 Pump dryjob. 10:30 - 15:00 4.50 WINDO RIP PROD2 POOH f/ 9756'to 383'. 15:00 - 16:30 1.50 WINDO ULD PROD2 UD milling BHA. Upper mill guaged @ 8.5" OK. 16:30 - 17:00 0.50 WINDO ULD PROD2 Clear rig floor of unneccessary tools. 17:00 - 18:30 1.50 WINDO OTHR PROD2 Pull wear bushing. Wash stack, function all rams & annular, kill line valves, choke line valves. 18:30 - 19:15 0.75 WINDO OTHR PROD2 Install Vetc/Gray wear bushing. UD (2) 5" HWDP. Printed: 9/3012005 6:19:05 AM • • ConocoPhillips Alaska Page 30 of 45 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ~ From - To i 8/14/2005 19:15 - 20:15 20:15 - 22:00 22:00 - 23:00 23:00 - 23:30 1 E-170 1 E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Hours ~ Code Code ~' -Phase 1.00 RIGMNT RSRV PROD2 1.75 DRILL PULD PROD2 1.00 DRILL OTHR PROD2 0.50 DRILL TRIP PROD2 23:30 - 23:45 0.251 DRILL i OTHR PROD2 23:45 - 00:00 0.25 DRILL TRIP PROD2 8/15/2005 00:00 - 05:30 5.50 DRILL TRIP PROD2 06:30 - 07:00 0.50 DRILL LOT PROD2 07:00 - 12:00 5.00 DRILL DRLG PROD2 8/16/2005 12:00 - 13:00 I 1.00 I DRILL DRLG I PROD2 13:00 - 13:30 0.50 DRILL CIRC PROD2 13:30 - 14:00 0.50 DRILL TRIP PROD2 14:00 - 14:30 0.50 DRILL CIRC PROD2 14:30 - 18:00 3.50 DRILL TRIP PROD2 18:00 - 18:30 0.50 DRILL TRIP PROD2 18:30 - 19:30 1.00 DRILL TRIP PROD2 19:30 - 20:00 0.50 DRILL OTHR PROD2 20:00 - 21:00 1.00 DRILL PULD PROD2 21:00 - 22:30 1.50 DRILL PULD PROD2 22:30 - 23:30 1.00 DRILL OTHR PROD2 23:30 - 00:00 0.50 DRILL OTHR PROD2 00:00 - 01:00 1.00 DRILL TRIP PROD2 01:00 - 05:30 .4.50 DRILL TRIP PROD2 05:30 - 06:00 0.50 DRILL REAM PROD2 Spud Date: 6/26/2005 Start:. 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description, of Operations Change out washpipe packing on top drive. PU drilling assembly to drill out of "B" lateral whipstock/window. PU Sperry Sun motor, MU bit, PU Sperry Sun MWD/LWD, float sub, then orient. Upload MWD. PU stand of flex collars, stand of HWDPw/ jars., RIH 1 stand of Weatherford 5" slick dp to 440' Shallow test Sperry Sun MWD tools @ 440'. Pressure test swivel packing to 4500 psi. OK. SLM while RIH w/ Weatherford 5" dp f/ 440' to 824'. SLM while RIH w/ Weatherford 5" dp f/ 824' to 9719'. RIH w/ 1.5 deg motor to drill out of "B" lateral window, fill pipe every 25 stands. Picked up 10 more Lo-Tads to stand back in derrick. Have a total of 79 Lo-Tads in derrick or hole. - - Orient motor to high side. Turn off pumps, go past top of whipstock @ 9776', top of window 9778.5' MD/ 3331' TVD, bottom of window @ 9794.5' MD/ 3334' TVD, then to full guage hole @ 9799'. Break circ @ 9799', wash/ream underguage hole f/ 9799' to 9820' w/ 600 gpm 3650 psi. PU wt 185k w/o pumps, SO wt 112 w/o pump. PU wt 162k w/ pump, SO wt 105 w/ pump. PU f/ 9820' to 9719'. No trouble going through window. RU to perform LOT. Decided not too. R/D test equipment. Directional drill 8 1/2" hole f/ 9820' to 9990' (3341' TVD) ART 2.35 hrs, AST 1.15 hrs w/ Sperry Sun 1.5 deg motor, 10-25k WOB, 0-80 rpm's, 550 gpm, 9.0-9.1 ppg mw, on bottom pressure 3150 psi, off bottom pressure 2980 psi, on bottom torque 14-17k ft/Ib, off bottom torque 12k ft/Ib, PU wt 180k, Dn Wt 95k ,Rot wt 130k. Directional drill 8 1/2" hole f/ 9990' to 10050' (3337' TVD) ART .27 hrs, AST .19 hrs w/ Speny Sun 1.5 deg motor, 10-25k WOB, 0-80 rpm's, 550 gpm, 9.0-9.1 ppg mw, on bottom pressure 3150 psi, off bottom pressure 2890 psi, on bottom torque 14-17k ft/Ib, off bottom torque 13k ft/Ib, PU wt 180k, Dn Wt 95k ,Rot wt 130k. Circ w/ recip and rotate pipe. MW D survey, SPR's, monitor well. POOH f/ 10050' to 9705`. No problems through window bottom @ 9794.5' to 9778.5' top of window. Monitor well, pump dry job. Continue POOH f/ 9705' to 1295' w/ Sperry Sun 1.5 deg motor to PU Geo-pilot. No problems. Continue POOH f/ 1295' to 348' w/ Sperry Sun 1.5 deg motor to PU Geo-pilot. Work BHA. Stand back HWDP, jars, flex collars, break bit. Download Sperry Sun MWD. UD Sperry Sun MWD and motor. PU/MU Geopilot, Sperry Sun LWD/MWD tools, nuke sub and pulsar sub. Up Load MWD/LWD. PJSM on loading nuke sources Shallow test MWD/LWD tools @ 108' w/ 560 gpm 1180 psi. Shallow test MWD/LWD tools @ 108' w/ 560 gpm 1180 psi. PJSM; Load Gamma and Nuetron sources. Trip in Hole with BHA # 17 Trip in Hole; 5" Drill Pipe 31jts Pick Up ghost Reamer, Continue trip in Hole Fill Pipe Every 25 stands To 9,778' Go Through window, Wash and Ream from 9,960' To 10,038' Up WT. 180k, Dn Wt. 110k, Rot Wt. 125k, 120 RPM, 600GPM, 3,330psi. Printed: 9/30/2005 6:19:D5 AM • ConocoPhillips;_Alaska Page 31 of 45' Operations Summary.. Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 1 E-170 1 E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 Date From - To Hours 8/16/2005 106:00 - 12:00 12:00 - 18:00 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Spud Date: 6/26/2005 End: 9/10/2005 Group: Code ~ Code ',' Phase Description of Operations 6.001 DRILL I DRLH I PROD2 6.00 I DRILL DRLH PROD2 18:00 - 00:00 6.00 DRILL DRLH PROD2 8/17/2005 00:00 - 06:00 6.00 DRILL DRLH PROD2 06:00 - 12:00 12:00 - 18:00 18:00 - 00:00 18/18/2005 00:00 - 06:00 6.00 DRILL I DRLH PROD2 6.001 DRILL I DRLH I PROD2 6.001 DRILL I DRLH I PROD2 6.00 I DRILL DRLH I PROD2 06:00 - 13:00 I 7.00 DRILL ~ PROD2 Directional Drill 8 1/2" hole F/ 10,050' T/ 10,305' (3,333' TVD) ART 4.62 hrs, Bit Hrs 4.62, 5-20k W08,80 - 120 RPM, 550 gpm, 9.0-9.2ppg MW, On BTM 2,870 psi, Off BTM 2800 psi, On BTM 11-17k ft/Ib,Off Btm 14k ft/Ib, PU wt 165k, Dn Wt 90k ,Rot wt 130k. ECD 11.4ppg. Directional Drill 8 1/2" hole F/ 10,305' (3,333' TVD) T/ 10,549' (TVD 3,338') ART 5.28 hrs, Bit Hrs 9.9, 5-20k WOB,80 - 120 RPM, 550 gpm, 9.0-9.2ppg MW, On BTM 2,940 psi, Off BTM 2,850 psi, On BTM 13-18k ft/Ib,Off Btm 14k ft/Ib, PU wt 180k, Dn Wt 80k ,Rot wt 130k. Directional Drill 8 1/2" hole F/ 10,549' (TVD 3,338') T/ 11,018' (TVD 3,328') ART 3.49 hrs, Bit Hrs 13.65, 5-20k W06,80 - 120 RPM, 600 gpm, 9.0-9.2ppg MW, On BTM 3,210 psi, Off BTM 3,160psi, On BTM 13-18k ft/Ib,Off Btm 14k ft/Ib, PU wt 215k, Dn Wt 95k ,Rot wt 140k. ECD 11.8 Directional Drill 8 1/2" hole F/ 11,018' (TVD 3,328') T/ 11,238' (3,331'Tvd) ART 4.97 hrs, Bit Hrs 18.62, 15-25k W06,140 RPM, 600 gpm, 9.0-9.2ppg MW, On BTM 3,330 psi, Off BTM 3,260psi, On BTM 15-24k ft/Ib,Off Btm 14k ft/Ib, PU wt 220k, Dn Wt 95k ,Rot wt 140k. ECD 11.8. Average Rate of Penatration 45'per hr 220' Total ff Drilled. Directional Drill 8 1/2" hole F/ 11,238' (3,331') T/ 11,673' (3,331' Tvd)ART 3.69 hrs, Bit Hrs 22.31, 5-25k WOB,140 RPM, 550 gpm, 9.2ppg MW, On BTM 2,870 psi, Off BTM 2,840psi, On BTM Torq 13-24k ft/Ib,Off Btm Torq 21 k ft/Ib, PU wt 225k, Dn Wt 80k ,Rot Wt. 140k. ECD 11.7 Average Rate Penetration 117' per hr. 435' Total Ft. Drilled. Directional Drill 8 1/2" hole F/ 11,673' (3,331') T/ 11,814' {3,330' Tvd) ART 5.53 hrs, Bit Hrs 27.84, 10-25k W0B,140 RPM, 550 gpm, 9.0-9.1ppg MW, On BTM 2,930 psi, Off BTM 2,840psi, On BTM Torq 15-214k ft/Ib, Off Btm Torq 15-21 k ft/Ib, PU Wt. 225k, Dn Wt. 85k ,Rot Wt. 140k. ECD 11.4 Average Rate Penetration 25' per hr. 141' Total Ft. Drilled. Directional Drill 8 1/2" hole F/ 11,814' (3,330' Tvd) - T/ 12,093' (3,324'Tvd) - PU Wt. 220k,- Dn Wt. 95k, -Rot Wt. 140k.-GPM 600 - Press on Btm-3,280'.- Press off Btm 3,180' -RPM 140,- Torq,on Btm. 17-22,- Torq Off Btm. 14-16,- Actual Drill Time 5.10 -Bit Hrs. 32.94 - Average Rate Penetration 55' per hr: 279' Total Ft. Drilled. -Max Gas 242 units. Directional Drill 8 1/2" hole F/ 12,093' (3,324'Tvd) T/ 12,489' (3,319' Tvd) - UP Wt. 230k,- Dn Wt. 90k, -Rot Wt. 140k.-GPM 557 -Press on Btm-2,900'.- Press off Btm 2,870' -RPM 120,- Torq,on Btm. 17-22,- Torq Off Btm. 18,- Actual Drill Time 4.92 -Bit Hrs. 37.86 -Average Rate Penetration 80' per hr.- 396' Total Ft. Drilled. -Max Gas 127 units. Note; Hit possible fault @ approximately 400' further then expected @12,300' Dropped RPM and GPM to help build angle. 12,490' Back in sands. Directional Drill 8 1/2" hole F/ 12,489' (3,319'Tvd) T/ 12,687' (3,311' Tvd) - UP Wt. 225k,- Dn Wt. 85k, -Rot Wt. 130k.-GPM 600 -Press on Btm-3,430'.- Press off Btm 3,380' -RPM 120,- Torq,on Btm. 15-22,- Torq Off Btm. 14-19k,- Actual Drill Time 6.15 -Bit Hrs. 44.01 -Average Rate Penetration 33' per hr.- 198' Total Ft. Drilled. -Max Gas 161 units. 13:00 - 16:30 3.50 RIGMNT RGRP PROD2 Circulate while repair on #1 pump liner gasket, Broke stud on pony rod. 16:30 - 18:00 1.50 DRILL DRLH PROD2 Directional Drill 8 1/2" hole F/ 12,687' (3,311' Tvd) - T 12,697' (3,310' Tvd)Up Wt. 225k,- Dn Wt. 85k, -Rot Wt. 130k.- GPM 600 -Press on Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 32 of 45 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date .From - To 8/18/2005 ~ 16:30 - 18:00 1 E-170 1 E-170 ROT -DRILLING D 15CM@conocophillips.com Doyon 15 ' Hours f Code ~ Sub Phase ICode 1.501 DRILL I DRLH I PROD2 18:00 - 23:15 I 5.251 DRILL I DRLH PROD2 23:15 - 00:00 I 0.751 RIGMNTI RGRP I PROD2 06:00 - 12:00 I 6.00 I DRILL DRLH I PROD2 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations Btm-3,430'.- Press off Btm 3,380' -RPM 120,- Torq,on Btm. 15-22,- Torq Off Btm. 14-19k,- Actual Drill Time 1.41 -Bit Hrs.45.42 -Average Rate Penetration 7' per hr.- 10' Total Ft. Drilled. -Max Gas151 units. ECD 11.6ppg. Directional Drill 8 1/2" hole F/ 12,687' (3,311' Tvd) - T 12,920' (3,308' Tvd) UP Wt. 225k,- Dn Wt. 85k, -Rot Wt. 130k.-GPM 600 -Press on Btm -3,430'.- Press off Btm 3,380' -RPM 120,- Torq,on Btm. 15-22,- Torq Off Btm. 14-19k,-Actual Drill Time 3.78 -Bit Hrs.49.20 -Average Rate Penetration 59' per hr.- 223' Total Ft. Drilled. -Max Gas 242 units. ECD 11.8ppg Work on Kelly hose wearing on stand Upper Tool Jt. While Drilling. Showing signs of wear: Loosen union and put turn in hose. Directional Drill 8 1/2" hole F/ 12,920' (3,308' Tvd). T/ 13,323'(3,302 TVD) PU Wt. 220k,- Dn Wt. 90k, -Rot Wt. 140k.- GPM 600 -Press on Btm-3,430'.- Press off Btm 3,380' -RPM 140,- Torq,on Btm. 16-23,- Torq Off Btm. 18k,-Actual Drill Time 4.25 -Bit Hrs.53.45 -Average Rate Penatration 94.82' per hr.- 403' Total Ft. Drilled. -Max Gas 142 units. ECD 11.8ppg NOTE; Pumped Sweep @ 13,118', 40% increase on returns. 10.9 ppg 160vis.40bbls. ECD 12.2ppg 11.8ppg: After Sweep. Directional Drill 8 1/2" hole F/ 13,323'(3,302 TVD) T/ 13,711' (3,290' Tvd). PU Wt. 230k,- Dn Wt. 80k, -Rot Wt. 125k.- GPM 600 -Press on Btm-3,430'.- Press off Btm 3,390' -RPM 140,- Torq,on Btm. 15-21,- Torq Off Btm. 18k; Actual Drill Time 4.25 -Bit Hrs.57.61 -Average Rate Penatration 91.29' per hr: 388' Total Ft. Drilled. - ECD 12ppg. 12:00 - 18:00 6.00 DRILL DRLH PROD2 Directional Drill 8 1/2" hole F/ 13,711' (3,290' TVD) T/ 13,811' (3,284' Tvd). PU Wt. 230k,- Dn Wt. 80k, -Rot Wt. 125k.- GPM 600 -Press on Btm-3,560'.- Press off Btm 3,490' -RPM 140,- Torq,on Btm. 15-21,- Torq Off Btm. 18k,-Actual Drill Time 5.29 -Bit Hrs. 62.90 -Average Rate Penatration 18' per hr.- 100' Total Ft. Drilled. - ECD 12.2ppg. 18:00 - 00:00 6.00 DRILL DRLH PROD2 Directional Drill 8 1/2" hole F/ 13,811' (3,284' TVD) T/ 14,058' (3,277' Tvd). PU Wt. 220k,- Dn Wt. 85k, -Rot Wt. 135k.-GPM 600 -Press on Btm-3,570'.- Press off Btm 3,510' -RPM 140,- Torq,on Btm. 19,- Torq Off Btm. 19k,- Actual Drill Time 4.35 -Bit Hrs. 67.25 -Average Rate Penatration 18' per hr.- 24T Total Ft. Drilled. - ECD 12.3ppg. Pumped Sweep @ 14,038' 40 bbl sweep 25% increase in returns. 18/20/2005 100:00 - 01:30 I 1.501 DRILL DRLH I PROD2 01:30 - 04:00 I 2.501 DRILL REAM I PROD2 04:00 - 06:30 I 2.501 RIGMNTI RGRP I PROD2 06:30 - 13:00 I 6.501 DRILL I REAM I PROD2 Directional Drill 8 1/2" hole F/ 14,058' (3,284' TVD) T/ 14,101' (3,277' Tvd). UP Wt. 220k,- Dn Wt. 85k, -Rot Wt. 135k.- GPM 600.- Press on Btm-3,570'.- Press off Btm 3,510' -RPM 140.,- Torq,on Btm. 19; Torq Off Btm. 19k,-Actual Drill Time.57 -Bit Hrs. 67.42 -Average Rate Penetration 75' per hr.- 43' Total Ft. Drilled. - ECD 12.6ppg. No Change in ECD. After Sweep. Back Ream Out of Hole,F/14,101' T/12,490' Pull Speed 10-20 feet a min, 600 GPM, 3,560psi. Short Trip to Place Ghost Reamer at window. Circulate Hole while Cleaning up fluid discharged from broken mud bucket line. 3 bbls in Containment Approximately 6 gals Outside containment Security and Environmental notified @ 04;05am. Replace line and clean up. Back Ream Out of Hole,F/12,290' T11,275' Pull Speed 4-6 feet a min, 600 GPM, 3,360psi. Short Trip to Place Ghost Reamer at window. Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Fage'33 of 45' Operations Summary. Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING ContractorName: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours ~ Code Code Phase 8/20/2005 13:00 - 14:00 1.00 DRILL CIRC PROD2 14:00 - 16:00 2.00 DRILL TRIP PROD2 16:00 - 16:30 0.50 DRILL REAM PROD2 16:30 - 18:00 1.50 DRILL DRLH PROD2 18:00 - 00:00 8/21/2005 00:00 - 06:00 6.001 DRILL I DRLH I PROD2 6.001 DRILL I DRLH I PROD2 06:00 - 17:30 I 11.50 DRILL DRLH I PROD2 17:30 - 18:00 18:00 - 23:45 23:45 - 00:00 8/22/2005 00:00 - 00:30 00:30 - 01:00 01:00 - 01:45 01:45 - 08:15 0.50 DRILL CIRC PROD2 5.75 DRILL TRIP PROD2 0.25 DRILL CIRC PROD2 0.50 DRILL CIRC PROD2 0.501 DRILL (TRIP PROD2 0.75 DRILL REAM PROD2 6.501 DRILL f REAM I PROD2 08:15 - 15:30 7.25 DRILL OTHR PROD2 15:30 - 16:30 1.00 RIGMNT RSRV PROD2 16:30 - 19:15 2.75 DRILL TRIP PROD2 19:15 - 22:45 3.50 DRILL REAM PROD2 22:45 - 00:00 1.251 DRILL I CIRC I PROD2 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Spud Date: 6/26/2005 End: 9/10/2005 Group: Description of Operations Circulate and Recipacate F/ 11,275' - T/ 11,330' Trip in Hole; F/11,275' - 14,006' Average slack off wt 80k Dn Wt. Wash and Ream F/ 14,006' - T/ 14,101' No Hole Problems on Trip. Directional Drill 8 1/2" hole F/ 14,101' (3,277' TVD) T/ 14,138' (3,3,274' Tvd). UP Wt. 230k,- Dn Wt. 80k, -Rot Wt. 120k.-GPM 585 -Press on Btm-3,640'.- Press off Btm 3,510' -RPM 140,- Torq,on Btm. 19,- Torq Off Btm. 19k,- Actual Drill Time..65 -Bit Hrs. 68.47 -Average Rate Penetration 56 per hr.- 37' Total Ft. Drilled. - ECD 12.6ppg. No Change in ECD. After Sweep. Directional Drill 8 1/2" hole F/ 14,138' (3,274' TVD) T/ 14,575' (3,269' Tvd). UP Wt. 230k,- Dn Wt. 80k, -Rot Wt. 120k.- GPM 550 -Press on Btm-3,120'.- Press off Btm 3,090' -RPM 140; Torq,on Btm. 20,- Torq Off Btm. 18k,- Actual Drill Time. 4.07 -Bit Hrs. 72.54 -Average Rate Penetration -107 per hr.- 43T Total Ft. Drilled. - ECD 11.7ppg. Max Gas Units 247, Lower Pump Rate @ 14,292' F/600GPM - T/ 550 GPM T/ Manage ECD. Annular Velocity 220 ft per min. @ 550GPM in 8.8 hole. Directional Drill 8 1/2" hole F/ 14,575' (3,269' Tvd). T/ 15,000' (3,252'Tvd) UP Wt. 230k,- Dn Wt. 80k, -Rot Wt. 130k.-GPM 550 - Press on Btm-3,200'.- Press off Btm 3,170' -RPM 140,- Torq,on Btm. 20; Torq Off Btm. 18k,- Actual Drill Time. 4.53 -Bit Hrs. 77.07 - Average Rate Penetration 94 per hr.- 425' Total Ft. Drilled. - ECD 11.7ppg. Max Gas Units 550, Pumped Sweep @ 14,903' 35% increase in returns at Shakers. Directional Drill 8 1/2" hole F/ 15,000' (3,252'Tvd) T/ 15756' (3,231' Tvd)TD. UP Wt. 2250k,- Dn Wt. Ok, -Rot Wt. 139k: GPM 550 -Press on Btm-3,640'.- Press off Btm 3,580' -RPM 140,- Torq,on Btm. 20,- Torq Off Btm. 18k,- Actual Drill Time. 6.98 -Bit Hrs. 84.05 -Average Rate Penetration 94 per hr.- 425' Total Ft. Drilled. - ECD 12.6ppg. Max Gas Units 490. Pumped Sweep @ 15,430' Circulate Rotate and Reciprcate Back Ream Out of Hole,F/15,756' - T/ 14,000' Pull Speed 4-6 feet a min, first 8 stands, 25-30 feet per min. while backreaming out 550 GPM, 3,210psi. Short Trip to last short trip depth 14,000' Pull 3 stands on Elevators pulled good.T/ 13,714. Circulate, Rotate and Recipacate BTMs Up. Circulate, Rotate and Recipacate BTMs Up. 600 GPM - 3,340psi - 140 RPM Up Wt. Trip. in Hole 13,714 Would not go down Wash and Ream F 13,912' - T/ 14,420' Still would not go down with out ,washing and reaming @ 550 GPM -140 RPM - Back Ream Out of Hole F/ 14,420' - T/ 10,700' - 140 RPM - 560GPM -3,100psi. Pumped Sweep while slowly pulling up T/Windoow W/ Ghost Reamer, 40% increase in cutting (fine sand). Pull through window with Ghost reamer continue back reaming T/10,700 Mad Pass F/10,700' - T/ 9,762' @ 3-oft amin/Per MWD. Service Rig, Monitior well Trip in Hole; F/ 9,762' - T/ 14,450' Wash and Ream in Hole F/ 14,450' 6 stands of Heavy wieght on top. 14,450' Wash 2stands down try to go down without rotation, Still no down wieght, Ream stand down, Pull up 30' try to go down just with pumps, No down wieght, 15,561, 18 stands Heavy wt. Was able to get down wt. 80k down Ream to Btm. 15, 756'. Circulate and condition hole, Pump 35 BBL Sweep 10.5ppg 130vis. Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 34 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date I From - To Hours Code Code Phase 8/22/2005 ~-22:45 - 00:00 ~ 1.25 f 1 DRILL CIRC PROD2 18/23/2005 100:00 - 01:45 01:45 - 06:45 1.751 DRILL CIRC ~ PROD2 S.OO DRILL STRIP ~PROD2 06:45 - 07:45 1.00 RIGMNT RSRV PROD2 07:45 - 12:00 4.25 DRILL TRIP PROD2 1200 - 13:30 1.50 DRILL PULD- PROD2 13:30 - 14:15 0,75 DRILL PULD PROD2 14:15 - 18:15 4.00 DRILL PULD PROD2 18:15 - 19:15 1.00 DRILL PULD PROD2 19:15 - 19:45 0.50 DRILL OTHR CMPLT2 19:45 - 00:00 4.25 WELCT BOPE CMPLT2 18/24/2005 100:00 - 03:00 I 3.00 WELCTu BOPE ~ CMPLT2 03:00 - 10:00 I 7.001 RIGMNTI RGRP I CMPLT2 10:00 - 10:30 0.50 WELCT BOPE CMPLT2 10:30 - 11:15 0.75 RIGMNT RGRP CMPLT2 11:15 - 12:00 0.75 CMPLTN RURD CMPLT2 12:00 - 12:30 0.50 CMPLTN SFTY CMPLT2 12:30 - 20:00 7.50 CMPLTN RUNT CMPLT2 20:00 - 20:15 I 0.251 CMPLTNI OTHR CMPLT2 20:15 - 00:00 I 3.751 CMPLTNI RUNT I CMPLT2 8/25/2005 100:00 - 01:00 I 1.001 CMPLTNI RUNT I CMPLT2 01:00 - 01:30 ~ 0.501 CMPLTNI CIRC CMPLT2 Spud Date: 6/26/2005 Start: .6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group:. Rig Number: 15 Description of Operations 50% increase in returns. GPM-537, PSI.-3,840' RPM-140, UP WT. 260k - Dn Wt.- 115k, -Rot Wt. 170k. Torq 20k.After sweep. Circulate and Condition Hole: Displace hole with solids free Oil Base Mud. GPM 537- PSI 4,000-RPM 140- Up Wt. 280k: Dn Wt.95k-Rot Wt.170.- Torq 22k. after Displaced. Note; Before displacement GPM 537-PSI 3,840. -RPM 140.-Up Wt. 260k.-Dn Wt. 115k: Rot Wt. 170k. Torq 20 Trip Out Hole. Drop Drift 2", SLM, F/ 15,756'- T/ 9,650' Up Wt 230k, Dn Wt.90k. Note: Tight Spot @ F/13,417' - T/13,222' 30-35k overpull. Cut Drill Line, 140' Inspect Brakes, Monitor Well Trip Out Hole: SLM, F/ 9,650' - T/ 385' L/D HWT D.P. Jars, and flex-collars. - PJSM on removing gamma and nuetron sources, and remove. Download LWD tools. Lay Down BHA. Clean rig floor. Rig Up to test BOPE 250psi. low 3,000psi. high, Pull wear ring. Set test plug, Test BOPE (test Jt Bad had to L/D and R/U new Jt.) Rig Up to test BOPE 250psi. low 3,000psi. high, Test BOPE, All test except Hydr11 Tested. Hydril Failed. Nipple Down Bell Nipple,Flow Line, Change Out Hydril Element. Nipple up Flow nipple and equipment, Re-Test Hydril 250 low, 3,000high. Pull test plug and set wear ring. Re-Install Drip Pan R/U to run 5 1/2" liner PJSM; Co-Man, Baker Rep and rig crew on running 5 1/2" Liner. Make Up Shoe Jt.-Insert Pack off Jt.Run. -Cross -Over Pup DWCxBTC- 5 1/2" L-80 slotted Liner 42- DWC, Cross-Over Pup BTC x BTCM, 32- BTCM 5 1/2" L-80 15.5 Slotted Liner, 10- BTCM 5 1/2" L-80 15.5 Blanks with 4 Restrictors, 50- BTCM 5 1/2" L-80 15.5 Slotted Liner. 1-BTCM 5 1/2" L-80 Blank,- 5 1/2"x7" Cross Over,1-Jt. BTCM 7" 26ppf. I-80 CSG, 1- 7" BTCM 26ppf L-80 Pup, Baker "HR" liner setting Sleeve 7", Running Tool,-5,799' of 5 1/2 liner W/ Running Tool.(4.22'), liner Up Wt,115k, Dn Wt, 90k, 5" DP, 5 -stands slick Pipe-35 Stands 5" W/ LodTads, 5 1/2" liner @ 9 5/8" Window 9,738' ,Pumps On 30RPM: Torque 7K - UP wt of 150k, 7500 ft/Ib Dn Wt 115k, Rot wt 125k w/ 7500k ft/ Ib torque.3 bpm 150psi. Pumps Off 30 RPM 7,500k Torq, Up Wt. 170k, Dn Wt. 105k. Rot Wt.130k. Run in Hole; F / 9,738' T/ 13,770' W/ 5 1/2" Liner. 43 Stands 5" W/ LodTads, 3 stand 5" HWDP. Trouble Getting in hole F/ 11,648' Work pipe. Rotated through and work through tight spot Depth 11,648' 11,728',11,900', 12,155', 12,205', 12,801', 12,420', Up Wt 210k, Dn Wt 85k when we could get down weight. 30 RPM, 15,000 Torq. Worked pipe down T/ 13,493', to best use 5" Hwt. Drill Pipe. Ran 3 stands 5" Hwt Up Wt.240k, Dn Wt 80k. Run in Hole WJ 5 1/2" Liner. F( 13,770' - T/ 15,756' Total = 5 stands- 5" Drill Pipe. 73 Stands 5" W! LodTads, 19 stand 5" HWDP. 6 -Stands 5" Drill pipe W/ LodTads. Tagged Btm @ 15,756', Up Wt. 290k. Dn Wt. 105k. Drop 7/16" ball. put liner on depth @ 15,745' Liner Top @ 9,950' Circ Pfintetl: 9l3U/LWS 6:'19:05 AM ~ • Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Date j From - To 8/25/2005 101:00-01:30 ConocoPhillips Alaska operations Summary Report 1 E-170 4E-170 ROT -DRILLING D15CM@conocophillips.com Doyon 15 5Ub l Hours ~ Code Phase ..Code 0.501 CMPLTN CIRC CMPLT2 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 01:30 - 05:45 4.25 CMPLTN TRIP CMPLT2 05:45 - 06:00 0.25 CMPLTN OTHR CMPLT2 06:00 - 07:00 1.00 CMPLTN PULD CMPLT2 07:00 - 10:00 3.00 CMPLTN TRIP CMPLT2 10:00 - 11:00 I 1.00 I CMPLTNI OTHR I CMPLT2 11:00- 12:45 I 1.751 CMPLTNICIRG- -(CMPLT2 12:45 - 16:45 4.00 CMPLTN TRIP CMPLT2 16:45 - 18:00 1.25 CMPLTN PULD CMPLT2 18:00 - 19:00 1.00 CMPLT OTHR CMPLT2 19:00 - 20:30 1.50 CMPLTN RURD CMPLT2 20:30 - 22:45 2.25 CMPLT PULD CMPLT2 22:45 - 23:30 0.75 CMPLTN PULD CMPLT2 23:30 - 00:00 0.50 CMPLTN TRIP CMPLT2 18/26/2005 00:00 - 05:30 I 5.501 CMPLTNI TRIP I CMPLT2 05:30 - 09:45 I 4.251 CMPLTNI SOHO I CMPLT2 103:30 - 15:00 1.501 CMPLTNI RURD CMPLT2 15:00 - 15:30 I 0.501 CMPLTNI RURD I CMPLT2 15:30 - 17:00 I 1.50 CMPLTN PULD (CMPLT2 17:00 - 17:30 0.50 CMPLTN OTHR CMPLT2 17:30 - 00:00 I 6.501 CMPLTNI TRIP I CMPLT2 .8/27/2005 100:00 - 03:45 I 3.751 CMPLTNI TRIP I CMPLT2 Page 35 of 45 Spud Date: 6/26/2005 End: 9/10/2005 Group: Description of,Operations ball down @ 5 bpm w/ 500 psi. Slow down to 3.5 bpm w/ 125 bbls pumped. Ball landed @ 152 bbls pumped (1,504 strokes). Pressure to 3000 psi to set hanger. Slacked off 10k .Pull Up 240k Up Wt. Up Wt was 290k W /liner. Press 4,000psi. T/ Unseat ball Liner Released. Trip Out hole. Break Off Liner Running toot Clean rig Floor P/U Whip Stock Retrieval BHA Trip in Hole With Whipstock Retrieval BHA. T/ 9,710' Up Wt. 230k-Dn Wt. 120k. Fill Pipe, Establish Circulation 53 SPM W/ 535psi. Up Wt. 230k- Dn Wt. 120k. Slack Off T/ 9,785' Latch Up Whip Stock @ 9,783'. Pulled 100k Over Up Wt. No Movement Jarred Up, Took 8 Attempts and sheared out @ 120k Over. Pulled up T! 9,685' and Flow Check, Circulate Btms Up @ 115 SPM W/ 2,210psi.Pumped 470 bbls. Btms Up Gas 120 units Circulate Additional Btms Up 470 bbls Flow Check ,well static, Trip Out Hole W/ Whipstock. L/D Retrieving Tool, Whipstock Assembly and Seal Assembly Clean Rig Floor of Tools and Oil Base R/U Csg Equipment Tongs and Elevators. P/U Hook Hanger Assembly and 2 7/8" Internal Assembly, R/D Csg Tools and Handling Tools Trip In Hole W/ Hook Hanger Assembly Total Assembly Length 227.77' T/1098' Trip in Hole W/ Hook Hanger F/ 1,098' - T/ 9,761' 2 min a stand. Up Wt. 230k, Dn Wt. 130k. @ Window Trip in Hole Tagged @ 9,900 P/U Wt 240. Dn Wt.130k.Pull Back Up T/ Window 9,780' Rotate Pipe 3 Turns Slacked off tagged at 9,883'. Showed on tally 5 1/2" x 8" centralizer On spacerjt @ Window, Worked pipe Through window Tagged @ second Centralizer 78' on Pup above ECP Work Through window, Hooked on window on Depth 9,794' depth of hook P/U rotate Pipe Went down and tagged on 7" x 5 1/2" Cross-over on Depth @ 10,004' pull Back Up Rotate Missed Hoook, Rotate work Torque down Landed on hook pulled back off came right back down hooked window again. on depth 9,794' set down 50k 2x Each time 10-15k over pull coming back off. Pull up break connection drop 29/32 Ball. Pump Total of 160 bbls press up to. 800psi. ball unseated. Pull Up Break connection Dropped 1 3/4 ball press up staged up Tl2,700Psi. Ecp started to fill press back up T/2,700psi total amount to fill ecp .8 bbl. Pressure up to 3,500psi Hydrolic release Up Wt. 240k (Trip Out Hole W/ Running tool. Lay Down Running tools and 2 7/8 and 2 3/8 Inner string. Clean Rig Floor and clear of Equipment. PJSM on Running L.E.M. running order R/U Tongs, Elevators, and Handling equipment. Make Up seal, LEM, and Packer Assembly, Change Elevators, Clear Floor, Pick up LodTads to Replace worn loadtads, While Tripping in hole. Trip in Hole: 70'-80' Per Min. With L.E.M. Assembly. Replacing Worn LodTads. Trip in Hole: With L.E.M. Assembly remove Worn LodTads Replace with new. T/ 9,748' Total Changed Out 34 LodTads, Up Wt. 235k. Dn Wt. 130k. Printed: 9!30!2005 6:19:05 AM • • ConocoPhillips Alaska Page 36'of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To Hours ~ Code ~ Sub L Phase ~ Description of Operations ' -1- Code jr' L 8/27/2005 ~03:45 - 04:15 0.50 ~ CMPLT~RIP I CMPLT2 04:15 - 05:30 I 1.251 CMPLTNI PCKR I CMPLT2 05:30 - 09:45 4.25 CMPLTN TRtP CMPLT2 09:45 - 10:15 0.50 CMPLT TRIP CMPLT2 10:15 - 10:45 0.50 CMPLTN OTHR CMPLT2 10:45 - 12:00 1.25 RIGMNT RSRV CMPLT2 12:00 - 13:00 1.00 RIGMNT RSRV CMPLT2 13:00 - 14:00 1.00 RIGMNT RGRP CMPLT2 14:00 - 16:15 2.25 WINDO ULD PROD3 16:15- 17:00 0.75 WINDO ULD PROD3 17:00 - 18:00 1.00 WINDO ULD PROD3 18:00 - 23:45 5.75 WINDO RIP PROD3 23:45 - 00:00 0.25 WINDO OTHR PROD3 18!28/2005 100:00 - 00:45 I 0.751 WINDOV'USETW I PROD3 00:45 - 01:15 I 0.501 WINDOV'I/CIRC ~ PROD3 01:15 - 07:15 I 6.001 WINDOWSCML I PROD3 07:15 - 08:30 1.25 WINDO CIRC PROD3 08:30 - 08:45 0.25 WINDO RIP PROD3 08:45 - 10:00 1.25 RIGMNT RSRV PROD3 10:00 = 12:00 2.00 WINDO RIP PROD3 12:00 - 12:15 0.25 WINDO CIRC PROD3 12:15 - 13:30 1.25 WINDO RIP PROD3 13:30 - 15:15 1.75 WINDO ULD PROD3 15:15 - 16:00 0.75 WINDO OTHR PROD3 16:00 - 18:00 2.00 DRILL PULD PROD3 18:00 - 22:00 4.001 DRILL (TRIP PROD3 22:00 - 22:30 0.50 DRILL OTHR PROD3 22:30 - 00:00 I 1.501 DRILL I DRLG I PROD3 Trip in Hole: With L.E.M. Assembly T/ 9,772' Top of Hook hanger with Seal Jt. Up Wt.235k Dn Wt. 130k. Did not see any weight change, Run in T/ 9,912' set 30k Down pull up 25k Over Pull Release. Slack Back off set 30k Pull 15k over set slips break Jt. Drop Ball. Depth's Mule Shoe @ 9,912', Hanger @ 9,772', Top Of L.E.M. 9,710' Circulate 1 3/4" Ball down T/ Set Packer Press up T! 3,000psi Hold for 2 min press stayed at 3,000psi. Bleed down. Press up Annulus T/ 500psi to test Packer, Hole @ (4,857'-4,861') LOT 620 Psi. W/ 9ppg. Put 500psi on 9 5/8 annulus bleed Down, Monitor 13 3/8x9 5/8" Annulus started W/ 200psi.(Diesel in Annulus). Press up 9 5/8"x 5" to 500psi. 13 3/8"x 9 5/8" Press climbed to 740psi. Bleed Down 9 5/8 annulus. 13 3/8 x 9 5/8 annulus tracked down with bleed Off. Back T/250psi. Pull up to confirm release, Pulled free set back down 3 times 40k to manually confirm packer seta Up Wt. 230k. Dn Wt. 130k. Trip Out Hole: With L.E.M. Running Tool F/ 9,710' UD L.E.M. Running Tool, Clear Floor of handling tools Test 13 3/8" x 9 5/8" Rate .5 BPM @ 300psi. Pumped 3 bbls returns at flow nipple. Change Out Saver Sub on Top Drive Rig Service Change Out Low Drum Drawworks Chain (Preventive Maintance) Pick Up seal, Whip stock and Mill Assembly Upload MWD Tools. P!U Remainder BHA and Shallow Test MWD tools. Continue to P/U BHA and shallow test MWD Trip in Hole: W/Whip Stock Assembly and Mill Assembly T19,650' Break circulation and Orientate Whip Stock 16 left. Up Wt. 240k, Dn Wt. 128. Set Anchor (Locator sub at 9,710') W/ 50k, Pulled 10k over 250k insure set. Set 15,000 Torque limit rotate Stall, Worked pipe rotate at free point. Whip Stock set Depth; Top of Window 9412' (TVD 3,274') Bottom of Window, 9,428'. (TVD 3,276') All Markers on Depth. PJSM: Mud Change Out From Solids Free Oi{ Base To Drilling Oil base Mud, 504 GPM, 2,950psi. When Drilling OBM Clears Bit. Start Milling Window. Milling Window, RPM 80-100 (Less vibration on MWD higher RPM), Torq 10-15k, GPM 505, PSI 2,950, WOB 3-6k, Milling Depth Top of Window 9,412', BTM Of Window 9,428' TVD 3,276'. Note; Mud Swap Done @ 02:00. Pump Sweep 130vis, 11 ppg. GPM 600- PSI 3,640', Monitior Well, Trip Out Hole T/ 9,355' Cut and Slip Drill Line, Inspect Brakes, Service Top Drive. Trip Out Hole: F/ 9,335' - T/ 5,807' Pipe came wet, Stop Pump Sweep, Trip Out of Hole: F/ 5,807' - T/ 200' UD Mill BHA, Upper Mill in Gauge, P/U stack washer and wash out B.O.P. Pick Up Drilling BHA, Surface Test MWD, GPM 500, PSI 440, P/U Total BHA. TIN W/ 5" D.P. F/ DERRICK FILLING EVERY 25 STANDS TO 9396' ORIENT TOOL FACE TO 16L STOP PUMP AND SLIDE THROUGH WINDOW 9412' TO 9431' START PUMPS Directional Drill 8 112" D Lateral sands: W! 1.5 Motor: F/ 9,448' T/ Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips,Alaska Page 3T of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips,com Rig Name: Doyon 15 Date ~ Fl-om - Try Hours ~ Code ~ ~ 'Sub ~Code phase 8/28/2005 22:30 - 00:00 ~ 1.50 1 DRILL I DRLG PROD3, 18/29/2005 100:00 - 05:45 05:45 - 07:15 5.751 DRILL I DRLH I PROD3 1.501 DRILL I REAM I PROD3 07:15 - 07:30 0.25 DRILL TRIP PROD3 07:30 - 08:15 0.75 DRILL CIRC PROD3 08:15 - 08:30 0.25 DRILL OBSV PROD3 08:30 - 12:00 3.50 DRILL TRIP PROD3 12:00 - 13:45 1.75 DRILL PULD PROD3 13:45 - 14:00 0.25 DRILL OTHR PROD3 14:00 - 17:00 3.00 DRILL PULD PROD3 17:00 - 17:30 0.50 DRILL SFTY PROD3 17:30 - 18:00 0.50 DRILL PULD PROD3 18:00 - 22:45 4,75 DRILL TRIP PROD3 22:45 - 23:00 0.25 DRILL TRIP PROD3 23:00 - 00:00 1.00 DRILL REAM PROD3 8/30/2005 00:00 - 01:30 1.50 DRILL OTHR PROD3 01:30 - 06:00 I 4.501 DRILL I DRLG i PROD3 06:00 - 12:00 I 6.001 DRILL I DRLG I PROD3 12:00 - 18:00 I 6.00 I DRILL I DRLG PROD3 18:00 - 00:00 6.00 DRILL ~ DRLG PROD3 8/31/2005 100:00 - 03:00 I 3.00 I DRILL I DRLG I PROD3 Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations 9,678' Up Wt. 195k Dn Wt. 115k Rot Wt. 125k GPM 508 PSI 2,965 RPM 50 Tq On BTM 10K Tq Off BTM 8K JAR HRS 1.0 ADT .59 AST .41 BIT HRS 1.0, Directional Drill 8 1/2" D Lateral sands: W/ 1.5 Motor: F/ 9,678' - T/ 10,154' (3,279 TVD) Up Wt. 195k Dn Wt. 115k Rot Wt. 125k GPM 508 PSI 2,965 RPM 80 Tq On BTM 12K Tq Off BTM 9K JAR HRS 4.70 ADT 3.42 AST 1.24 BIT HRS 4.70, Pump Sweep 30% increase at shakers, Back Ream Out Hole: F/ 10,154' - T/ 9,491' Check Shots every 100', Up Wt. 185k, Dn Wt 115k, Rot Wt. 135, Torq. 11k, RPM 80, GPM 500, PSI 2,870, Trip Out Hole: F/ 9,491' - T/ 9,301' Circulate: Clean Hole @ GPM 550, PSI 3,100, Pumped Tota- 480bb1s. Monitioor Well: Pump Dry Job Trip Out Hole: F/ 9,301' - T/ 350' L/D BHA # 21 and download MWD. Clear and Clean Rig Floor. P/U BHA # 22 Geo-Pilot; Up link LWD and shallow Test Tools. PJSM: Handling and loading of Nuetron and Gamma Sources and Install. P/U BHA # 22 Flex Collars, Jars and Hwt Dp. Total 292.89 Trip in Hole: Fill every 25 stands, T/ 9,360' Fill Pipe, set Deflection, Go Through window (9,412'-9,428'). Ream F/ 9,480' - T/ 10,051' Pump Sweep 30 bbl 11 ppg 146 vis Reamed F/ 10,051' Tagged at 10,060', Took Wieght went T/ 10,065' Picked Up to verify Depth,( Depth is correct). Look at logs and Drilling slide sheet. Started Drilling @ 10,060' Old logs and Tag coralate With being 95' off of Motor Run. Directional drill 8 1/2" "D" lateral sands f/ 10,060' to 10,486' (3267' TVD) ART 3.17 hrs, w/ Sperry Sun Geo-Pilot, 4-9k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3100 psi, off bottom pressure 3015 psi, on bottom torque 13-16k ft/Ib, off bottom torque 15k ftllb, PU wt 190-195k, Dn Wt 98-95k ,Rot wt 140-138k. Directional drill 8 1/2" "D" lateral sands f/ 10,486' to 10,939' (3267' TVD) ART 3.52 hrs, w/ Sperry Sun Geo-Pilot, 10-20k WOB, 120 rpm's, 600 ~ gpm, 9.0 ppg mw, on bottom pressure 3150 psi, off bottom pressure 3120 psi, on bottom torque 15-17k ft/Ib, off bottom torque 15-16k ft/Ib, PU wt 200k, Dn Wt 95k ,Rot wt 135k. ECD 11.22ppg Directional drill 8 1/2" "D" lateral sands f/ 10,939' to 11,500' (3262' TVD) ART 4.3 hrs, w/ Sperry Sun Geo-Pilot, 10k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3190 psi, off bottom pressure 3110 psi, on bottom torque 15-17k ft/Ib, off bottom torque 17-21k ft/Ib, PU wt 202k, Dn Wt 90k ,Rot wt 130k. ECD 11.63ppg. Pumped Hi-vis weighted to 11.0 ppg sweep @ 11240' f/ ECD's. Note: Vetco/Gray tested 13 3/8" x 9 5/8" packoff to 4200 psi f/ 15 min. OK. Directional drill 8 1/2" "D" lateral sands f/ 11,500' to 12,127' (3257'. TVD) ART 3.95 hrs, w/ Sperry Sun Geo-Pilot, 7-17k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3200-3320 psi, oft bottom pressure 3100-3280 psi, on bottom torque 14-20k ft/Ib, off bottom torque 14-20k ft/Ib, PU wt 210-215k, Dn Wt 85-90k ,Rot wt 135k. ECD 11.7 ppg. Pumped Hi-vis weighted to 11.0 ppg sweep @ 12050' f! ECD's. Directional drill 8 1/2" "D" lateral sands f/ 12,127' to 12,405' (3253' TVD) Printed: 9/30/2005 6:19:05 AM 05:30 - 06:00 I 0.50 RIGMNT RGRP PROD3 06:00 - 12:00 6.00 DRILL DRLG PROD3 ConocoPhillips;Alaska Page 38 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours }, Code :Code ',Phase 8/31/2005 100:00 - 03:00 3.00 DRILL rDRLG I PROD3 03:00 - 05:30 I 2.501 RIGMNTI RGRP I PROD3 19/1!2005 12:00 - 18:00 6.00 DRILL DRLG PROD3 18:00 - 00:00 I 6.001 DRILL I DRLG I PROD3 00:00 - 06:00 I 6.001 DRILL I DRLG I PROD3 06:00 - 12:00 I 6.00 I DRILL I DRLG I PROD3 • Spud Date: 6/26/2005 Start: 6/22/2005 End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations ART 1.98 hrs, w/ Sperry Sun Geo-Pilot, 5-10k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3270-3320 psi, off bottom pressure 3250-3200 psi, on bottom torque 14-19k ft/Ib, off bottom torque 14-18k ft/Ib, PU wt 210-215k, Dn Wt 85-90k ,Rot wt 135k. ECD 11.6 ppg. Back ream f/ 12,405' to 11,745' w/ 454 gpm and 2000 psi, w/ 120rpm, 15-17k torque. Pulling @ 6-7 ft/min. Working on # 2 mud pump liner gasket.. RIH from 11,745' to 12,405' w/ no problems Directional drill 8 1/2" "D" lateral sands f/ 12,405' to 12,816' (3255' TVD) ART 4.08 hrs, w/ Sperry Sun Geo-Pilot, 10-20k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 2990-3300 psi, off bottom pressure 3240-3200 psi, on bottom torque 15-19k ft/Ib, off bottom torque 14-19k ft/Ib, PU wt 210-205k, Dn Wt 80-82k , Rot wt 135-140k. ECD 11.6-11.8 ppg. Pumped 11.0 ppg hi vis sweep @ 12050' and 12,780', 30% increase in cuttings returns. Directional drill 8 1/2" "D".lateral sands ff 12,816' to 13510' (3237' TVD) ART 3.98 hrs, w/ Sperry Sun Geo-Pilot, 10-15k WOB, 120 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3350-3460 psi, off bottom pressure 3210-3310 psi, on bottom torque 16-19k ft/Ib, off bottom torque 16-20k ftllb, PU wt 210k, Dn Wt 85-80k ,Rot wt 142-135k. ECD 11.8-11.95 ppg. Directional drill 8 1/2" "D" lateral sands f/ 13510' to 14199' (3221' TVD) ART 3.78 hrs, w/ Sperry Sun Geo-Pilot, 6-12k WOB, 120-140 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3550-3720 psi, off bottom pressure 3500-3650 psi, on bottom torque 19k ft(Ib, off bottom torque 18-20k ft/Ib, PU wt 215-230k, pn Wt 80- 70k ,Rot wt 135-132k. ECD 112-12.4 ppg. ,Pumped weighted hi vis sweep @ 13,640' and 14,110', no increase in cuttings returns. Directional drill 8 1/2" "D" lateral sands f/ 14199' to 14780' (3209' TVD) ART 3.43 hrs, w/ Sperry Sun Geo-Pilot, 6-12k WOB, 140 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3690-3890 psi, off bottom pressure 3650-3800 psi, on bottom torque 19-20k ft/Ib, off bottom torque 18-20k ft/Ib, PU wt 220k, Dn Wt 75-70k (block wt 70k) ,Rot wt 128-135k. ECD 12.4-12.6 ppg. Pump 11.0 ppg 140 vis sweep @ 14464' w/ no increase in cuttings. All 83 Lo tads in hole, started HWDP @ 14594', Directional drill 8 1/2" "D" lateral sands f/ 14780' to 15405' (3194' TVD) ART 3.78 hrs, w/ Sperry Sun Geo-Pilot, 6-20k WOB, 140 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 3890-4140 psi, off bottom pressure 3800-4030 psi, on bottom torque 19-21 k ft/Ib, off bottom torque 18-21 k ft/Ib, PU wt 220-235k, Dn Wt 70k (block wt 70k) ,Rot wt 135-138k. ECD 12.6-12.8 ppg. Pump 11.0 ppg 140 vis sweep @ 15116' MD w/ 10% increase in cuttings. 12:00 - 15:30 3.50 DRILL DRLG PROD3 Directional drill 8 1/2" "D" lateral sands f/ 15405' to 15748' (3185' TVD) ART 1.94 hrs, w/ Sperry Sun Geo-Pilot, 10-15k WOB, 140 rpm's, 600 gpm, 9.0 ppg mw, on bottom pressure 4140-4260 psi, off bottom pressure 4030-4260 psi, on bottom torque 20-23k ft/Ib, off bottom torque 18-21 k ft/Ib, PU wt 235-2455k, Dn Wt 70k (block wt 70k) ,Rot wt Printed: 9/30!2005 6:19:05 AM • ConocoPhillips Alaska Page 39 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22!2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 ~< Date ~ From - To (Hours ~' Code Code ~ Phase 9/1/2005 12:00 - 15:30 3.50 DRILL 15:30 - 15:45 0.25 DRILL 15:45 - 18:00 2.25 DRILL 18:00 - 00:00 6.00 DRILL 9!2(2005 00:00 - 03:00 3.00 DRILL 03:00 - 05:30 2.50 LOG 05:30 - 06:00 0.50 DRILL 06:00 - 08:00 2.00 DRILL 19/3/2005 Description of Operations' DRLG PRODS 135-142k. ECD 12.6-12.8 ppg. Pump 11.0 ppg 140 vis sweep @ 15702' w/ 30% increase in cuttings. CIRC PRODS Circ on bottom @ 15748' (3185' TVD) @ 600 gpm w 4240 psi, 140 rpm to move cuttings above BHA. Pump up survey @ 15745'. REAM PRODS Backream f/ TD @ 15748' to 14597' @ 600 gpm w/ 4240- 4100 psi, rotate @ 120 rpm, torque 18k ft/Ib. Rotating weight 125k w/ pumps on. Pulling speed 30-40 ft/min. REAM PRODS Continue backream f/ TD @ 15748' to 11437' @ 600 gpm w/ 4100-3120 psi, rotate @ 120-180 rpm, torque 18-16k ft/Ib. PU wt 205-190k. SO wt 85k-98k .Pulling speed 30-40 ft/min. REAM PRODS Continue backream f/ 11437'- 9850' @ 600 gpm w/ 3120-3000 psi, rotate @ 180 rpm, torque 16k ft/Ib. Pulling speed 30-40 ft/min. PU wt 180k, SO wt 100k, Rot wt 128k. Record PU & SO wt's. DLOG PRODS Mad Pass logging f! 9850' to 9502' bit depth. Logging-tool depth 9763' to 9415'. Pumping 600. gpm w/ 2950 psi, 120 rpm, torque 12k. TRIP PRODS Pull BHA f/ 9502', thru window (9428'-9412'), then up to 9360'. CIRC PRODS Circ 45 bbls weighted 11 ppg 140 vis sweep, follow w/ 3 bottoms up (1600 bbls), Rotate 120 rpm, 600 gpm w/ 2960 psi. 08:00 - 08:45 0.75 RIGMNT RSRV PRODS Slip and cut 109' drilling line. Inspect brake bands. 08:45 - 09:45 1.00 RIGMNT RSRV PRODS Service rig and top drive. 09:45 - 14:00 4.25 DRILL TRIP PRODS Trip in hole on elevators f19360' to 15702'. Pu wt 215k, SO wt 90K. No problems. Fill pipe every 20 stands. Record PU SO wt's. 14:00 - 14:15 0.25 DRILL REAM PRODS MU top drive, establish circ, precautionary ream f/ 15702'- TD @ 15748'. 14;15 - 14:45 0.50 DRILL CIRC PRODS Pump @ 580 gpm w/ 4190 psi. Circ total of 180 bbls when stand pipe "Y" leaked on rig floor. Blow down mud line. 14:45 - 16:30 1.75 RIGMNT RGRP PRODS POOH slow while repair leak on stand pipe. POOH f/ 15748' to 14700'. PU wt 260k, SO wt 70k (block wt 70k). 16:30 - 16:45 0.25 RIGMNT RGRP PRODS Pressure test stand pipe to 4000 psi. OK. 16:45 - 18:00 .1.25 DRILL REAM PRODS Ream in hole f/ 14700' to 15428'. Pump 500 gpm w/ 3800 psi, 120 rpm. 18:00 - 19:00 1.00 DRILL REAM PRODS Finish reamin back to bottom fl 14700' to 15748'. Pump 460 gpm w/ 3100 psi, 120 rpm. Torque 12-20k. 19:00 - 20:30 1.50 DRILL CIRC PRODS Circ BU prior to displacing well f/ 9.0 ppg oil base mud to solids free oil base mud. PJSM w! vac drivers, rig crew and mud engr while circ. 20:30 - 22:00 1.50 DRILL CIRC PRODS Pump 35 bbls spacer, follow w/8.9+ solids free oil base mud. Pump total of 1094 bbls solids free. Shut down. 22:00 - 22:15 0.25 DRILL CIRC PRODS Line up pits to take returns. Take slow pump rates. 22:15 - 23:15 1.00 DRILL CIRC PRODS Continue circ solids free total of 668 bbls pumped. Circ 600 gpm w/ 4200 psi. 23:15 - 00:00 0.75 DRILL TRIP PRODS Monitor well. Drop 2.00" rabbit, POOH f/ 15748' to 14689'. PU wt 300k, SO wt 70K= block wt 00:00 - 00:45 0.75 DRILL TRIP PRODS POOH F/ 14689' to 13990'. Air boot leaking on flow line @-BOP riser. 00:45 - 01:30 0.75 DRILL TRIP PRODS POOH F/ 13990' to 13865' slowly while working to replace air boot on flowline. Changed out (2) 12" air boots. 01:30 - 06:00 4.50 DRILL TRIP PRODS POOH F/ 13865' to 7480'. Ghost reamer and BHA came through window w/ no problems. Monitor well @ window- static. PU wt 220k, SO wt 85k. 06:00 - 09:30 3.50 DRILL TRIP PRODS POOH F/ 7480' to 292'. PU wt 230k, SO wt 85k. 09:30 - 10:00 0.50 DRILL PULD PRODS UD HW DP, jars and flex collars. 10:00 - 10:30 0.50 DRILL SFTY PRODS PJSM on unloading nuke sources. Remove sources. 10:30 - 12:00 1.50 DRILL OTHR PRODS Download MWD/LWD tools. UD tools. 12:00 - 13:00 1.00 DRILL PULD PRODS Continue UD tools. 13:00 - 14:00 ~ 1.00 ~ CMPLTN~ RURD ~ CMPLT3 ~ Clear floor of handling tools, change elevators, hold PJSM on running Printed: 9/3012005 6:19:05 AM • • ConocoPhillips Alaska Page 40 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To Hours I Code Code ~ Phase - - 9/3/2005 13:00 - 14:00 1.00 CMPLT RURD CMPLT3 14:00 - 18:00 4.00 CMPLTN RUNT I CMPLT3 18:00 - 19:00 I 1.00 I CMPLTNI RUNT I CMPLT3 19:00 - 23:00 4.00 CMPLTNITRIP CMPLT3 23:00 - 00:00 I 1.001 CMPLTN TRIP I CMPLT3 19/4/2005 100:00 - 06:00 6.00 I CMPLTNI TRIP I CMPLT3 06:00 - 07:15 I 1.251 CMPLTNI TRIP I CMPLT3 07:15 - 08:30 I 1.251 CMPLTNI TRIP I CMPLT3 08:30 - 09:00 I 0.50 I CMPLTNI OTHR I CMPLT3 09:00-10:001 1.OOICMPLTNICIRC (CMPLT3 10:00 - 12:00 2.00 CMPLTN TRIP CMPLT3 12:00 - 12:45 0.75 CMPLTN OTHR CMPLT3 12:45 - 14:15 1.50 CMPLTN TR{P CMPLT3 14:15 - 16:00 1.75 FISH PULD CMPLT3 16:00 - 20:15 4.25 FISH TRIP CMPLT3 20:15 - 20:45 I 0.501 FISH I FISH CMPLT3 20:45 - 21:00 I 0.251 FISH I TRIP I CMPLT3 Spud Date: 6/26/2005 Start: 6/22/2005. End: 9/10/2005 Rig Release: 9/10/2005 Group: Rig Number: 15 Description of Operations liner, RU to run liner. Clean floor. Run 5 1/2" "D" lateral completion liner to 6004' (5 1/2" guide shoe, 1 jt 5 1/2" BTCM 15.5 ppf L-80 blank jt, 1 jt 5 1/2" 15.5 BTCM L-80 slotted jt w/ insert packoff @ pin end, 138 jts 5 1i2" BTCM 15.5 ppf L-80 slotted pipe). 120k PU wt, 110K SO wt. Torque rings installed in all connections. Continue PU/MU/Run 5 1/2" "D" lateral completion liner f( 6004' to 6127'. Run 1 5 1/2" BTCM 15.5 ppf L-80 blank pup jt, 1 5 1/2" BTCM 15.5 ppf L-80 blank jt, 7" BTC box x 5 1/2" BTCM pin crossover, 1 jt 7" BTCM 26 ppf L80 blank jt, 1 7" BTCM 26 ppf L-80 blank pup jt, Baker 7" "HR" Liner setting Sleeve, Baker running tool. PU wt 125k, SO wt 80k, Block wt 70k. Torque rings installed in all connections. Run liner in hole on 5" dp. Run 5 stands slick, 62 stands w/ to-tads= 67 stands total dp. Record UP/Down and rotating weights @ 6223', 7099', 8089', 8584', 9079', 9376', 10067', 10561', 11056', 11551', 12045', 12539'. PU wt 205k, SO wt =block wt 70K, rot wt 145k. Started rotating 5 1/2" liner in hole @ 12605' w/ 25RPM, 14k torque, string speed 5'/min. Rotate to 12735'. Rotating 5 1/2" liner in hole f/ 12735' to' 14197'w/ 25RPM, 16k torque, string speed 5-10'/min. Recording PU/SO/ Rotating weight @ 13031', 13525`, 14012'. PU wt 240k, S0= block wt 70k, rotation 110k w/ slacking off. Rotating 5 1/2" liner in hole f/ 14197' to' 15748' w/ 25RPM, 16k torque, string speed 10-15'/min. Recording PUlSO/ Rotating weight @ 14475' and 14844'. Rotating 5 1/2" liner in hole f/ 14844'- 15748', w/ 25 rpm, 15k torque,string speed 45'/min- 60'/min. Recording PU/SO/ Rotating weight @ 15388' and TD 15748'. PU wt 290K, SO wt 80k, block wt 70k. Tag bottom w/liner @ 15748' rotating w/ 25RPM. Drop 29/32" ball. Put pipe on depth w/shoe @ 15736'. Note: Liner was run w/ 5 stands 5" slick dp (476.27'), 74 stands 5" dp w/ IoTads (7316.41'), then 20 stands 5" HWDP (1834.71'), 19' left above Rig floor. Baker guide shoe @ 15, 736.14', top of Baker "HR" setting sleeve @ 9612.71'. i Circ 29!32" ball down @ 5bpm w! 800 psi., slow to 3 bpm w/ 340 psi, pressure to 2400 psi to release liner. Pumped total of 152 bbls 8.9+ SFOBM. Pressure to 4080 psi to blow ball seat. PU to verify liner release. PU wt 245k. SO to check liner depth. Top of "D" lateral Baker 7" liner sleeve @ 9612.71'. POOH w/ Baker liner running tools f/ 9612' to 4500'. Monitor well. Continue POOH f/ 4500'. Clear rig floor of tools. PU Baker Whipstock retieving tools to floor, Make up Baker rertieving hook, 1 jt 5" HWDP, Sperry sun float sub, Baker bumper sub, Baker fishing jar. Total !nth of BHA 62.08'. RIH on 5 stands 5" slick dp, 83 stands 5" dp w/ to tads, 8 stands of HWDP. Fill pipe every 25 stands. PU wt 230k, SO wt110K. Slack off to find keyhole in whipstock 9418'. Work/ orient and rotate pipe several times, jar @ 290k, pull to 310, work up to 340K to pull free. Pipe movement @ 300k. Pull top of whipstock f/ 9418' to 9388'. Whipstock assembly consists of Whipstock slide, debris sub, ported sub, shear disconnect, bottom trip Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Page 41 of 45 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date I From - To I Hours ~ Code I Code ~ Phase i Description of Operations _~ - ~_- _ i 9/4/2005 20:45 - 21:00 ~ 0.25 FISH TRIP ~ CMPLT3 anchor, blank sub, (8) jts 5" dp, 5" pup jt (4.18', unloader sub, locator 21:00 - 23:15 2.25 FISH CIRG CMPLT3 23:15 - 00:00 0.75 FISH TRIP CMPLT3 19/5/2005 100:00 - 06:00 I 6.00 I FISH I TRIP I CMPLT3 06:00 - 07:00 1.00 FISH TRIP CMPLT3 07:00 - 07:15 0.25 FISH SFTY CMPLT3 107:15 - 08:00 I -0.751 FISH PULD I CMPLT3 08:00 - 09:00 I 1.00 I FISH I PULD I CMPLT3 09:00 - 09:15 0.25 CMPLTN SFTY CMPLT3 09:15 - 10:30 1.25 CMPLTN RURD CMPLT3 10:30 - 11:15 0.75 CMPLTN RUNT CMPLT3 11:15 - 11:30 0.25 CMPLTN RURD CMPLT3 11:30 - 12:00 0.50 CMPLTN RUNT CMPLT3 12:00 - 12:45 0.75 CMPLTN RUNT CMPLT3 12:45 - 13:15 I 0.501 CMPLTNI PULD I CMPLT3 13:15 - 18:00 4.75 CMPLTN RUNT CMPLT3 18:00 - 18:45 I 0.751 CMPLTNI RUNT I CMPLT3 18:45 - 19:30 I 0.751 CMPLTNI TRIP I CMPLT3 19:30 - 20:15 I 0.751 CMPLTNI TRIP I CMPLT3 sub, seal assembly w/ bull nose. Total length of whipstock assembly 298.06' Circ 2 bottoms up @ 8 bpm w/ 1000 psi. Get slow pump rates. Circ total 997 bbls. Blow down top drive. PU wt 220-260k. POOH slowly (20ft/min) (/ 9684' (bottom of fish) to 9136' Continue POOH slowly(30-45 ft/min) with whipstock assembly from 9136' to 1135'. Continue POOH slowly(30-45 ft/min) with whipstock assembly from. 9136' to 362'. PJSM w/ Baker rep, rig crew and CPAI rep on laying down whipstock assembly. UD Jars; bumper sub, float sub, jt of 5" HWDP, hook. Secure whipstock slide @ rotary table. UD Baker whipstock slide, debris sub, ported. sub, shear disconnectm bottom trip anchor, blank sub. UD 8 jts 5" dp, 5" pup jt, unloader sub, locator sub, seal assembly w/ bull nose. Clear rig floor of tools. PJSM on running Baker hook Hanger assembly. RU to run Baker hook Hanger assembly. RU to run Baker hook Hanger assembly consisting of: (1) jt 5 1/2" 15.5 ppf L-80 BTCM bent joint, (1) jt 5.5" BTCM 15.5ppf L-80 , (1) 5.5" BTCM 15.5 ppf L-80 pup jt, Baker Pay Zone external casing Packer, (3) 5.5" BTCM 15.5 ppf L-80 pup jt, (2) jts 5 1/2" BTCM 15.5 ppf L-80, (1) 5.5" BTCM 15.5 ppf L-80 pup jt> crossover bushing, Baker 9 5/8" x 7" Model B-1 Hook Hanger f/ LEM. Total length = 250.31' to leave in hole. Torque to 5k, install (2) 5 1/2" x 8 1/4" x 8" straight blade centralizers on pup jt above handling pup on EGP and pup below ECP. PU 2 7/8" handling tools to floor,. RU same. MU 2 7/8" inner string per Baker rep. Total length 217'. Change out elevators and MU Baker 9 5/8" x 7" Model B-1 hook hanger. Change out elevators. MU crossover to 5" drill pipe. Clear rig floor of casing tools. RIH w/ hook hanger (70 feet per min) on 5". Run (5) stands slick 476.27', (74) stands 5" DP w/ LoTads 7316.41', (8) stands 5" HWDP i 739.24'= total depth of 8789'. Continue RIH w/ hook hanger (70 feet per min) on 5". Run (5) stands 'slick 476.27', (74) stands 5" DP w/ LoTads 7316.41', (19) stands 5" HWDP 1741.95' = 9791.98' w/ 60.6' up = 9731'. Tag up on crossover in "B" lateral. (2.5' deep). POOH 4 stands f/ 9731' to 9412'. Screw into stand #94, PU w/mule shoe 5' above window. Rotate 4 rounds to right w/ max torque 10k ft11b. Hold torque, slack off, hit bottom of window. with centralizer 90' in on stand#95. This puts bottom of window 4' deep. PU, work pipe until centralizer went through. Continue in hole, hit top centralizer 35.5' in on stand #96 Work centralizer to get by window. (window 4' deep) Hook window @ 9433 w/ baker hook hanger. PU stand #97. PU wt 255k, SO wt 120k. Slackoff, tag mule shoe60' in on stand #97. Pickup 20', rotate 3 rounds to right, max torque 8k ft/Ibs, work pipe & slack off,tag crossover @ 60' in. Pickup, rotate one round, work pipe, slackoff. Hang hook hanger 55' in on stand #97 w/ 40k down. PU 15', rotate 3 rounds to right, max torque 8k ft/Ib.Slackoff & tag crossover 60' Printed: 9/30/2005 6:19:05 AM • • ConocoPhiilips Alaska Page 42 of 45 C}perations Summary Report Legal Well Name: 1 E-170 Common W ell Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: ROT -D RILLIN G Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM @conoc ophillip s.com Rig Release: 9/10/2005. Group: Rig Name: Doyon 1 5 Rig Number: 15 Date From - T Hours ode Ph cri tion of O er tions i D o i l C ~ Code ase ~ ' es p p a 9/5/2005 19:30 - 20:15 0.75 CMPLTN TRIP CMPLT3 in. PU 20', rotate 2 rounds to right with max torque 7k ft/Ib. Work pipe and slackoff, tag crossover 60' in. PU 20', rotate one round, max torque 6k ft/Ib. Work pipe. Slack off, hung hook hanger@ 55' in, set down 40k. PU, took 20k overpull to unhook hanger. Slack off. Hooked @ 55' in w! 40k down wt. (5' deep) 20:15 - 20:45 .0.50 CMPLTN OTHR CMPLT3 Drop 29/32" ball, fill pipe then pumped 6 bbls & pressured up. Stopped pumping @ 1800 psi. Bleed off, pressure to 1500 psi. Zero stroke counter. Pressure up to 2000 psi w/ 3 strokes. Pressure up to 2500 psi w/ 3 more strokes. pressure to 2800 psiw/ 2 more strokes. Pressure to 2900 psi w! 2 more strokes and ECP opened. Allow pressure to bleed back to 2700 psi & held pressure. Pressure back up to 2500 psi w/ 3 strokes (.3 bbls to inflate). Pressure up to 4000 psi, bleed off pressure. 20:45 - 21:30 0.75 CMPLTN CIRC CMPLT3 PU to Free travel @ 250k. Pull 2 stands to 9246'. Circulate @ 5bpm w/ 400 psi, circ 100 bbls. 21:30 - 00:00 2.50 CMPLT TRIP .CMPLT3 POOH w/ hook hanger running tools f/ 9260' to 4493'.. 9/6/2005 00:00 - 02:00 2.00 CMPLT TRIP CMPLT3 POOH w/ hook hanger running tools f/ 4493' to BHA inner string 02:00 - 02:15 0.25 CMPLTN SFTY CMPLT3 PJSM on UD inner string 2 7/8" 02:15 - 02:30 0.25 CMPLT OTHR CMPLT3 Clean rig floor. 02:30 - 03:30 1.00 CMPLTN PULD CMPLT3 L!D 2 7/8" inner string. 03:30 - 04:30 1.00 CMPLTN PULD CMPLT3 Clear floor of tools. PU tools to PU 4 1/2" LEM. 04:30 - 04:45 0.25 CMPLTN SFTY CMPLT3 PJSM on running 4 1/2" LEM f/ "D" lateral. 04:45 - 06:00 1.25 CMPLTN PULD CMPLT3 PUlMU 4 1!2" LEM consisting of :Baker seal assembly, (1) jt 4 1/2" 12.6 ppg L-80 IBT x STL, (7) jts 4 1/2" 12.6ppf L-80 IBTM tubing, 4 1/2" pup jt, LEM, (3) 4 1/2" pup jts, 4 1/2" casing swivel, crossover bushing 5 1/2 563 x 4 1!2" IBT, 190-47 casing seal bore, crossover 7" x 5 1i2" 563, (1) jt 7" 26 ppf, L80 Hydril 563 casing 06:00 - 06:45 0.75 CMPLTN PULD CMPLT3 Make up 2 7/8" inner string to 9 5/8" x 7" ZXP liner top packer. 06:45 - 07:00 0.25 CMPLTN PULD CMPLT3 Make up 9 5!8" x7" ZXP liner top packer, Check screws. OK. 07:00 - 07:15 0.25 CMPLTN OTHR CMPLT3 Clean rig floor, remove csg tools. 07:15 - 12:45 5.50 CMPLTN TRIP CMPLT3 RIH on 5" dp : 4 1/2" LEM consisting of :Baker seal assembly, (1) jt 4 112" 12.6 ppg L-80 IBT x STL, (7) jts 4 1i2" 12.6ppf L-80 IBTM tubing, 4 1/2" pup jt, LEM, (3) 4 1/2" pup jts, 4 1/2" casing swivel, crossover bushing 5 1/2 563 x 4 1/2" IBT, 190-47 casing seal bore, crossover 7" x 5 1!2" 563, (1) jt 7" 26 ppf, L80 Hydril 563 casing, Baker 9 5/8" x 7" ZXP liner top packer = 430.62' then Baker setting tool and 5' dp pup jt. Total of 441.59'. RIH 5 stands 5" slick (476.27', 74 stands 5" dp wi to-tads (7316.41'), 12 stands 5" HWDP(1105.62') w/ 21.1' up. PU wt 230k, SO wt 120k. 12:45 - 13:00 0.25 CMPLTN TRIP CMPLT3 Slack off watching top of "D" lateral @ 9412.28' {did not see anything), Continue running stands of HWDP fi derrick. Run stand 92, 93,94,95, and 96. PU wt 245k, SO wt 125k. 13:00 - 13:15 0.25 CMPLTN OTHR CMPLT3 Continue RIH w/ stand 96 (17th stand of HWDP). Did not see crossover in "B" lateral @ 21' in (9728'),.continue slack off to latch @ 37' in on stand 96 (9739' mule shoe depth) (9412,28' top of LEM in hook hanger of "D" lateral). Top of Casing seal receptacle in "B" lat LEM a 9729.91', bottom of casing seal receptacle @ 9749.31'. PU to 265k to verify latch. 13:15 - 13:45 0.50 CMPLTN CIRC CMPLT3 Drop 1 3/4" ball, pump down @ 5bpm w/ 500 psi f/ 1.00 bbls, slow to 3 bpm 300 psi, ball seated @ 120 bbls pumped. 13:45 - 14:00 0.25 CMPLTN PCKR CMPLT3 Pressure up to 3080 psi, set Baker ZXP packer @ 9308.62', presure to 4000 psi to release. 14:00 - 14:15 0.25 CMPLTN OTHR CMPLT3 PU, PU wt 240K-245K (verified release). PU 20' f/ 9308' to 9288'. Slack off 40k down w/ dogs to mech set packer as well. PU 20' rotate down w/ 40k on liner top pkr twice. Printed: 9/30/2005 6:19:05 AM • ConocoPhillips Alaska Page 43'of 45 Operations Summary''Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT - DRILLWG Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/10/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date ~ From = To 9/6/2005. 114:15 - 16:00 9/7/2005 16:00 - 22:00 22:00 - 22:30 'Hours ' Code'.Code 'Phase l 1.75 CMPLTN TRIP CMPLT3 I- 6.00 RIGMNTI RGRP CMPLT3 0.50 CMPLTN TRIP CMPLT3 22:30 - 00:00 1.50 CMPLT TRIP CMPLT3 00:00 - 03:00 3.00 CMPLTN TRIP CMPLT3 03:00 - 03:15 0.25 CMPLTN SFTY CMPLT3 03:15 - 04:00 0.75 CMPLTN PULD CMPLT3 04:00 - 05:00 1.00 CMPLTN OTHR CMPLT3 05:00 - 05:15 0.25 CMPLTN SFTY CMPLT3 05:15 - 06:00 0.75 CMPLTN PULD CMPLT3 06:00 - 08:45 2.75 CMPLTN PULD CMPLT3 08:45 - 13:45 I 5.001 RIGMNTI RGRP I CMPLT3 14:45 - 15:15 I 0.501 CMPLTN PULD I CMPLT3 15:15 - 18:00 I 2.751 CMPLTNI PULD I CMPLT3 18:00 - 19:45 I 1.751 CMPLTNI PULD I CMPLT3 19:45 - 20:00 I 0.251 CMPLTNI OTHR I CMPLT3 20:00 - 20:30 I 0.50 I CMPLTNI PCKR I CMPLT3 20:30 -21:00 0.50 CMPLTN PCKR CMPLT3 21:00 - 23:00 2.00 CMPLTN CIRC CMPLT3 l]escription of Operations Monitor well, POOH w/ running tools f/ LEM f/ 9308' to 8135'. PU wt 245k, SO wt 120k. Attempt to break out 1st stand LoTad. High torque , 30k. Broke 1st Lo Tad w/ rig tongs w/ 30K. Repair/ replace top cylinder of iron roughneck breakout. POOH f/ 8135 to 7938'. Check out Iron roughneck by making breaks on stand 78, OK. Break & UD LoTad f/ stand 78. Pull stand 79, break and lay down LoTad f/ stand simulating laying down dp f! dercick and removing LoTads. OK. Continue POOH f17938' to 5964'. 51 stands Lotads in hole @ midnight Continue POOH f/ 5964' to 80' S1 stands Lotads in hole. PJSM on UD LEM tools. UD LEM running tools. Pull Vetco/Gray wear bushing, clear rig floor. PJSM on PU 7" Baker Model WG Bridge plug and Baker Heavy duty Model "EA" retrievamatic, w/ 3 1/2" IF joint and 3 1/2" HT38 DP. MU 7" Baker Model WG Relievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 HT38, 3 1/2" HT38 DP. One joint made up @ 0600 hrs. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Modef "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 HT38, on 71 joints 3 1/2" 13.3ppf HT38. Rabbit dp to 2 5/16". Torque 3 112" IF conn to 10k, HT38 Conn to 16.5k ft/Ib. Trouble shoot and repair of pipe handling machine. Selonoid valve and spool. Slip & cut 136' drilling line. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 HT38, on 71 joints 3 1/2" 13.3ppf HT38, then start wl 3 1/2" 15.5 ppf HT38, 44 jts of 15.5 ppf in hole now. Total of 115 jts HT in hole. Rabbit dp to 2 5/16". Torque HT38 conn to 16.5k ft/Ib. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 HT38, on 71 joints 3 1/2" 13.3ppf HT38, then start w/ 3 1/2" 15.5 ppf HT38, 167 jts of 15.5 ppf in hole now. Total of 238 jts HT in hole. Continue RIH w/ 7" Baker Model WG Relievable Bridge plug, (1) jt 3 i 112" 13.3 dp 3 112"1F, Baker. Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1!2 HT38, on 71 joints 3 1/2" 13.3ppf HT38, then start w/ 3 1/2" 15.5 ppf HT38, 167 jts of 15.5 ppf in hole now. Total of 295 jts HT Picked up. Tag 9.04' in on jt # 295. PU wt 165k, SO wt 75k. MU crossover on jt 295, MU top drive and tag. top of liner @ 9308' (9.04' in on jt 295), bottom of bridge plug @ 9354.94'. PU, Break off single and drop 1-1/2" ball MU single, SO tag liner top, PU 6' above tag, circ ball to seat @ 3bpm w! 700 psi. Pressure up @ 50 bbls pumped. Pressure to 2300 psi. Pick up to 180k, shear off of bridge plug. Bridge plug top @9346.24', bottom @ 9348.94". Length of bridge plug 2.70' UD 2 jts, PU jt w/ x-o, MU top drive.Jt # 293 in hole while testing, jt 294 above rig floor. 9308' bottom of tool Circulate bottoms up @ 5bpm w! 1880 psi. Circ 600 bbls. Printed: 9/30/2005 6:19:05 AM • Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ~ From`'= To 9/7/2005 23:00 - 23:15 Start: 6/22/2005 Rig Release: 9/10/2005 Rig Number: 15 Page 44 of 451 Spud Date: 6/26/2005 End: 9/10/2005 Group: 23:15 - 00:00 0.75 CMPLTN DEQT CMPLT3 9/8/2005 00:00 - 00:30 0.50 CMPLTN DEQT CMPLT3 00:30 - 02:00 1.50 CMPLTN TRIP CMPLT3 02:00 - 02:30 0.50 CMPLTN TRIP CMPLT3 02:30 - 03:00 0.50 CMPLTN DEQT CMPLT3 03:00 - 03:45 0.75 CMPLTN DEQT CMPLT3 03:45 - 04:00 0.25 CMPLT OTHR CMPLT3 04:00 - 04:30 0.50 CMPLTN TRIP .CMPLT3 04:30 - 05:15 0.75 CMPLTN TRIP CMPLT3 05:15 - 07:30 2.25 CMPLTN OTHR CMPLT3 07:30 - 08:00 0.50 CMPLTN SFTY CMPLT3 08:00 - 10:00 2.00 CMPLTN CIRC CMPLT3 10:00 - 13:00 3.00 CMPLTN OTHR CMPLT3 13:00 - 13:30 0.50 CMPLTN SFTY CMPLT3 13:30 - 14:15 0.75 CMPLTN CIRC CMPLT3 14:15 - 14:30 0.25 CMPLT TRIP CMPLT3 14:30 - 15:00 0.50 CMPLTN SOHO CMPLT3 15:00 - 15:15 0.25 CMPLTN SOHO CMPLT3 ConocoPhillips Alaska Operations Summary Report 1 E-170 1 E-170 ROT -DRILLING D 15CM@conocophillips.com Doyon 15 ZXP liner top packer @ 9308' w/ test pkr @ 9259'. Rotate 5 turns to set packer. Set down 5k. Attempt to test Retrievable bridge plug. No test. PKR depth 9259'. Not enough weight to set test pkr. Circulating to surface. Attempt to test Retrievable bridge plug &ZXP packer. No test. PKR depth 9259'. Not enough weight to set test pkr. Only 5k above block weight. Circulating to surface. POOH Ud 5 jts of 3 112" 15.5 ppf XT38 dp. Stand back 11 stands in derrick to 8211' ~ Trip in hole w/ 11 stands 5" HWDP f/ 8211' to 9090'. 10 stands HW in hole. PU wt 190k. SO wt 105k. RI H f/ 9090' to 9163' (element center @ 9114'). Apply 5 rounds RH w/ 8k torque. Set test packer w/ 35k down wt to 70k block wt. Attempt to test, no test, PU to 9114', set 35k down wt. Test RBP @ 9346', ZXP liner top packer @ 9308' w/ test packer @ 9114'. Test to 2540 psi. Chart test. Held 97.3% of test pressure in 30 min. Pressure lost 68 psi f/ 2540 to 2472 psi. Bleed off pressure, onset packer. POOH f/ 9114' to 8170' w/ 5" HWDP. UD single 3 1/2" DP, TIH 11 stands 3 1/2" dp, PU 4 jts 3 1/2" dp. Total of 293 jts 3 1/2" in hole 27" up.=9308'. Flush surface lines, cement line, geopilot skid, kill and choke lines and manifold. PJSM on displacing f/ 9.0 ppg SFOBM to 9.6 ppg Sodium Chloride. Displace 9.0 ppg SFOBM to 9.6 ppg Sodium Chloride. Pump @ 6 bpm w/ 1540 psi. Pump a total of 6285 strokes (632 bbls). Cleaning on rig floor, transfer mud f/ rock washer while wait on brine to be brought over f/ mud plant in Prudhoe. RU truck of 290 bbls 9.6 brine. PJSM w/ crew. Fluid transfer paperwork. Pump 290 bbls 9.6 ppg Sodium Chloride @ 6 bpm w/ 1540 psi, POOH 3 jt 3 112" 15.5 ppf S-135 HT38 dp. 290 jts left in hole total. PU/MU Vetco/Gray 13 3/8" x 4 1/2" MB222, 13 1/2" OD hanger w/ dummy installed as penetrator and two way check installed in hanger. MU to 4 1/2" landing joint w/ 4.909 MCA connection on top. of hanger. Drain BOP stackto land kill string w/ running tool f( 7" retrievalble i , ~ Hours Cade I Cod~Phase Description of Operations 0.25 CMPLTN DEQT CMPLT3 RU to test Baker 7" Model WG Retrievable bridge plug set @ 9346.24' , bridge plug on bottom @ 9287.23' 15:15 - 15:45 0.50 CMPLT DEQT CMPLT3 Run in LDS on Vetco Gray hanger. Test lower body seals to 5000 psi f/ 10 min. OK. Test upper body seals to 5000 psi f/ 10 min. OK. 15:45 - 16:00 0.25 CMPLTN OTHR CMPLT3 Back out landing joint. UD same. 16:00 - 16:30 0.50 DRILL SFTY CMPLT3 PJSM. Install mouse hole. Rig up to UD 5" dp f/ derrick. Have Total 170 stands 5" DP in derrick. 20 stands 5" HWDP, 83 stands w/ LoTads, 67 stands slick. Cleaning fluids f/ pits and rock washer. 16:30 - 18:00 1.50 DRILL PULD CMPLT3 UD total of 13 stands 5" HWDP. Cleaning fluids f/ pits and rock washer. 18:00 - 19:30 1.50 DRILL PULD CMPLT3 UD total of 7 stands 5" HWDP. Cleaning fluids f/ pits and rockwasher. 19:30 -21:30 2.00 DRILL PULD CMPLT3 UD 5" DP w/ LoTads. Total of 83 to UD. UD 17 stands @ 1930 hrs: Cleaning fluids f/ pits and rockwasher. 21:30 - 00:00 2.50 RIGMNT RGRP CMPLT3 Pull Hyd cyl f( pipe spinner on iron roughneck f/ repair. 9/9/2005 00:00 - 00:30 0.50 RIGMNT RGRP CMPLT3 Pull Hyd cyl f/ pipe spinner on iron roughneck f/ repair. 00:30 - 06:00 5.50 DRILL PULD CMPLT3 UD 5" DP w/ LoTads. Total of 83 to UD. UD total of 42 stands @ 0600 hrs. Cleaning fluids fl pits and rockwasher. 06:00 - 10:30 4.50 DRILL PULD CMPLT3 UD 5" DP w/ LoTads. Total of 83 to UD, UD total of 53 stands @ 1030 Printed: 9/30/2005 6:19:05 AM • ~ ConocoPhillips Alaska Page 45 of 45 Operations. Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: ROT -DRILLING Start: 6/22/2005 End: 9/10/2005 Contractor Name: D15CM@conocophillips.com Rig Release: 9/14/2005 Group: Rig Name: Doyon 15 Rig Number: 15 Date From - To i Hours ~ Code C Code ~ Phase Description of Operations -----rte - -- -' _ - -- - 9/9/2005 06:00 - 10:30 4.50 DRILL PULD CMPLT3 hrs. Cleaning fluids f! pits and rockwasher. 10:30 - 11:30 1.00 RIGMNT RGRP CMPLT3 Replace pipe spinners on iron roughneck. Cleaning fluids f/ pits and 11:30 - 12:30 1.00 RIGMNT RSRV CMPLT3 12:30 - 13:00 0.50 DRILL PULD CMPLT3 13:00 - 15:00 2.00 RIGMNT RGRP CMPLT3 15:00 - 18:00 3.00 DRILL PULD CMPLT3 18:00 - 20:00 2.00 DRILL PULD CMPLT3 20:00 - 00:00 4.00 DRILL- PULD CMPLT3 9/10/2005 00:00 - 03:15 3.25 DRILL PULD CMPLT3 03:15 - 05:00 1.75 DRILL PULD CMPLT3 05:00 - 06:00 1.00 WELCT NUND CMPLT3 06:00 - 11:30 5.50 WELCT NUND CMPLT3 11:30 - 15:00 3.50 WELCT NUND CMPLT3 15:00 - 16:30 1.50 WELCT NUND CMPLT3 16:30 - 18:00 1.50 WELCT EQRP CMPLT3 18:00 -21:00 3.00 WELCT EQRP CMPLT3 21:00 - 22:30 1.50 WELCT EQRP CMPLT3 22:30 - 00:00 1.50 DRILL OTHR CMPLT3 rockwasher. Service rig. IUD 5" DP w/ LoTads. Total of 83 to UD. UD total of 55 stands @ 1300 hrs. Cleaning fluids f/ pits and rockwasher. !Replace lower dies in iron roughneck lower jaw. Could not get die retainer loose f! iron roughneck easily. UD 5" DP w/ LoTads. Total of 83 to UD. UD total of 74 stands @ 1800 hrs. Cleaning fluids f/ pits and rockwasher. UD 5" DP w/ LoTads. Total of 83 to UD. L/D total of 83 stands @ 1800 hrs. All LoTads are Layed down. Cleaning fluids f/ pits and rockwasher. Blow down mud lines in pits. Clean rock washer pits. UD 5" DP. Total of 67 to UD. UD total of 31 stands @ Midnight. Cleaning fluids f/ pits and rockwasher. UD 5" DP. Total of 67 to UD. UD total of 67 stands @ 0315 hrs. Cleaning fluids f/ pits and rockwasher. UD mousehole, UD pipe spinners (xtra), UD 8 1/2" ghost reamer, clean and UD Sperry Sun geo pilot Disconnect kill and choke lines. Prep to nipple down BOPE. Cleaning rig floor. Clean pipe racks, nipple down BOPE. Move rock washer away f/ rig modules, stage on 1 E pad. RU and nipple up Vetco Gray tree. Continue nippling up Vetco Gray tree. Test void to 5000 psi f/ 10 min. Leak on bleeder threads on tree cap flange. Test against swab valve to 5000 psi.0lC Note: Disconnect f/ HI LINE power @ 1500 hrs. Switch to rig power Prep rig floor for skidding rig. Rig down all complexes for rig move.. Blow down steam to pit module. turn tires & prepare to move pit module. Fold in beaver slide and secure same. Change out 9" Otis tree cap on Vetco Gray 4 1/6" 5m flange. Leak on 1" NPT fitting on flange galled threads). Use tree cap F/ 1J168 well. Reinstall tree cap, test to 250 psi low f/ 10 min. OK. Test to 5000 psi high f/ 10 min. OK. Secure well. PU tools in cellar. Release rig @ midnight 9/10/2005. f/ 5.1 mile move f/ 1 E-170 to 1 C-28. Move pits off of mats, move mats fl pit module and spot on road. Blow down steam to sub module. Printed: 9/30/2005 6:19:05 AM • • ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: WORKOVER/RECOMP Start: 10!17/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Code' Phase 10/17/2005 100:00 - 08:30 I 8.50 08:30 - 11:00 2.50 11:00 - 11:30 0.50 11:30 - 17:30 6.00 17:30 - 18:30 1.00 18:30 - 00:00 5.50 10/18/2005 00;00 --01;00 1.00 01:00 - 03:00 2.00 03:00 - 06:00 3.00 06:00 - 12:00 6.00 12:00 - 19:00 7.00 19:00 - 20:00 1.00 20:00 - 21:30 1.50 21:30 - 00:00 2.50 10/19/2005 00:00 - 01:00 1.00 01:00 - 02:00 1.00 02:00 - 06:30 4.50 06:30 - 10:30 4.00 10:30 - 13:00 2.50 13:00 - 19:00 6.00 19:00 - 22:30 3.50 122:30 - 00:00 I 1.501 10/20/2005 , 00:00 - 05:30 ~ 5.50 05:30 - 07:00 ~ 1.50 Page 1 of 14 Spud Date: 6/26/2005 End: 11 /13!2005 Group: Description of Operations MOVE RURD MOVE Rig on location, line rig up with well head and locate position for rig mats and containment. Pull rig forward, spot rig mats and layout Herculite for containment. Spot rig over well. Connect modules (pipe shed & pits). MOVE RURD MOVE Raise derrick, connect all lines and secure rig. Accept rig @ 1100 hrs 10/17/2005. WELCT NUND DECOMP Raise derrick, connect all lines and secure rig. Accept rig @ 1100 hrs 10/17/2005. WELCT BOPE DECOMP NU BOPE. (13-5/8" stack.)Verify well is dead, Pull BPV, instal! two way check. WELCT SFTY DECOMP Held pre-spud meeting with both crews. WELCT BOPE DECOMP Test BOP's to 250/3000 psi, annular to to 250!2500 psi. Chuck Sheve with (AOGCC) waived BOP test. WELCT BOPE DECOMP Complete BOP test.. - - WELLS PLGM DECOMP Drain BOP. stack. Pull two way check WELLS RURD DECOMP Make up landing joint to tubing hanger. Back out lock down studs. Unland tubing hanger at 95k up weight. Lay down landing joint, tubing hanger with one joint of 4.5" tubing below hanger. FISH PULL DECOMP Begin POOH w/ 3.5" HT38 driN pipe with test packer to 5000'. Standing back and strapping drill pipe in derrick to ensure the exact location of leak. FISH PULL DECOMP Hunting hole in 9 5/8" casing with test packer and 3.5" HT38 DP. Found two leaks one at 4' out on jt.137 approximate depth 4863' MD. Isolated second leak to be at 20' out on jt 190 or about 4769' MD tested bottom of top leak and found it to be less than 5' lower or 4774' MD. Depths are approximate until we strap out and measure the sealing elements on test packer. Top leak communicated with OA 13 5/8 by 9 5/8 immediately. This means we would need to span 94' of leaks. WELLS RURD DECOMP Lay down head pin FISH PULL DECOMP Begin POOH w/ 3.5" HT38 drill pipe with test packer. Standing back and strapping drill pipe in derrick to confirm leak depths. FISH PULL DECOMP Continue OOH w/drill pipe. On surface with drill pipe and test packer. WELLS RURD DECOMP Lay down BHA (test packer assembly) WELLS RURD DECOMP Install wear ring WELLS RURD DECOMP Make up scraper run BHA WELLS TRIP DECOMP After back strapping out of hole with kill string leak depths where determined to be (bottom leak 4861'-4856' RKB 2 BPM @ 910 PSI top leak 4757'-4752' RKB we could not establish a rate as we where not rigged up to cir). The OA but we could pump @ 2BPM threw the leak) overall length of 109' of bad pipe. BHA made up 217' total length consisting of 8" Casing Scraper, 8 5/8" String mill, Bit Sub, Bumper Sub, Oil Jar, 6-6" Drill Collars and Drill Pipe to surface. Start running in the hole with Scraper run to 5000' MD with 3.5" HT38 DP. WELLS TRIP DECOMP On depth with scraper run. Work threw squeeze depth could nat see any indications of tightness. Work up and down and Circulate long way 1.5 bottoms up 4.5 BPM @ 420 psi WELLS TRIP DECOMP Bottoms up circulation completed. Pull out of hole with scraper run standing back Drill Pipe. LOG I RURD ~ DECOMP Rig-up E-line for USIT log to 5500' with wireline tractor. Had trouble I function testing tools on surface. Finally got good function test. LOG ~ LOG ~ ELOG ELOG ~ DECOMP ~ DECOMP RIH w/ USIT log assembly with tractor to 5500' Continue E-line USIT log with tractor to 5500' LOG ~ PULD i ~ DECOMP ~ . Rig DWN Schlumberger and Clear rig floor Prepare to re-rig return Printed: 11/222005 9:48:25 AM • • ConocoPhillips Alaska Operations Summary Report Page 2 of 14 Legal Well Name: 1 E-170 Common W ell Name: 1E-170 Spud Date: 6/26/2005 Event Nam e: WORKO VER/R ECOM P Start: 1 011 7/2 0 0 5 End: 11/13!2005 Contractor Name: N3SCM @conoc ophiiiip s.com Rig Release: 11/13!2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Phase Description of Operations Code 10/20/2005 05:30 -07:00 1.50 LOG PULD DECOMP lines from OA. 07:00 - 09:00 2.00 WELCT NUND DECOMP Re-rig harline to tanks for circulation step rate test from 9 5/8" to 13 318" casing. Burm up new 70 BBL returns tank. 09:00 - 10:30 1.50 WELCT CIRC DECOMP Begin circulation step rate test. 1 BPM 9 5/8" = 50 13 3/8" = 400 2 BPM 9 5/8" = 160 13 3/8" = 400 3 BPM 9 5/8" = 220 13 3/8"= 400 4 BPM 9 5/8" = 270 13 3/8" = 400 Maintained 400 PSI on the OA to stay 75 PSI over !SIP Returns = 1-1 throughout step rate test. Re-freeze protected OA with 65 BBLS diesel. Utilized 41 BBLS during test, and added 24 BBLS for good measure. 10:30 - 11:30 1.00 WELCT NUND DECOMP Rig up Hot oil for the freeze protect. Pump freeze protect 11:30 - 12:00 0.50 -WAITON EOIP DEGOMP Change of scope.. Call out-Baker RBP. w/sand plug .for isolation of lower wellbore. Clean rig floor. 12:00 - 13:30 1.50 WAITON EQIP DECOMP Continue to STBY for Baker. 13:30 - 15:30 2.00 WAITON SFTY WRKOVR Nabors management meeting with hourly employees to discuss issues within the ranks. 15:30 - 18:00 2.50 CMPLT TRIP WRKOVR Pick up Baker RBP asym with tubing stop. Baker RBP 8.22" OD, tubing stop @ 8.5" OD aprox 680' above RBP. Begin RIH. 18:00 - 21:30 3.50 CMPLT TRIP WRKOVR Located liner lap @ 25.5" in on stand number 87 (4850'). Pulled stand number 87. 21:30 - 23:00 1.50 WELLS PLGM WRKOVR Set Baker RBP. Top of plug @ 5445'. Rig-up head pin. Rig-up Schlumberger pump truck to lay sand plug above RBP. 23:00 - 00:00 1.00 WELLS PLGM WRKOVR Held PJSM. Mix sand for sand plug. 10/21/2005 00:00 - 02:00 2.00 WELLS PLGM WRKOVR Release from RBP. Pressure test Schlumberger equipment and lines to 3000 psi. Pump 18.5 bbls sand/gelling/antifoam agent followed by 34 bbls brine from pits @ 3 bpm (550 psi). Rig down pump Schlumberger. Remove head pin. Pull four stands. Slight over balance on outside of DP after pumping sand plug. Reverse circulate 40 bbls brine. 02:00 - 05:30 3.50 WELLS TRIP WRKOVR POOH w/ 3.5" DP and Baker retrieving head. Pick up circulating head and circulate bottoms up due to pulling wet. 05:30 - 07:30 2.00 WELLS TRIP WRKOVR Continue to POOH. Monitoring hole conditions. 07:30 - 08:00 0.50 WELLS PULD WRKOVR Lay down running tools for RBP. Clear rig floor and prepare to RBIH for HES cement retainer deployment. 08:00 - 09:30 1.50 WELLS PULD WRKOVR Pick up HES cement retainer and prepare to RBIH. Installed 10ea. 5K shear pins into retainer. Tool string data in pipe tally. Hole conditions ~ are stable. 09:30 - 12:00 2.50 WELLS TRIP WRKOVR Continue to RIH. 12:00 - 15:15 3.25 WELLS PLGM WRKOVR Set HES cement retainer @ 4,672' RKB. Rotate 26 turns to the right and witnessed 4 turns of reactive torque. 15:15 - 15:45 0.50 WELLS CIRC WRKOVR Pressure test drill pipe by 9 5/8" ann to 1,000 PSI. Pressure test good. Unsting from retainer and circulate. 2 BPM @ 145 PSI. returns 1-1 15:45 - 16:25 0.67 WELLS CIRC WRKOVR Drill pipe and 9 5/8"ann no longer pressure testing. Returns to surface instantly after pump initiation. Initial test held. Not sure what has happened. 16:25 - 18:50 i 2.42 WELLS i CIRC WRKOVR ( After several attempts to reseal HES cement retainer perform injection test. 2 BPM @ 970 PSI on the OA while bullheading. Discuss with Anchorage about continuing program as per plan with extra caution. 18:50 - 19:50 ' 1.001 WELLSR SFTY I WRKOVR ' Discuss with all personal, job issues and safety concerns. Call out little I red for a OA injection test. 19:50 - 20:20 ~ 0.50 WELLS CIRC WRKOVR Little Red on location. 20:20 - 22:00 ! 1.67 ~ WELLSf~ CIRC WRKOVR , Rig-up LRS on IA. PT lines 2500#. Verify if check in retainer is holding. Printetl: 11lZ%JZUOb y:48:Zb AM • Phase ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: WORKOVER/RECOMP Start: 10/17/2005 Contractor Name: N3SCM@conocophiflips.com Rig Release: 11/13/2005 Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Code 10/21/2005 20:20 - 22:00 1.67 WELLSF~ CIRC 22:00 - 23:00 1.00 CEMENTI PULD 23:00- 00:00 1.00 WELLS CIRC 10/22/2005 00:00 - 03:00 3.00 WELLS CIRC 03:00 - 07:30 4.50 WELLS TRIP 07:30 - 12:30 .5.00 WELLS RURD 12:30 - 15:30 3.00 WELLS TRIP 15:30 - 16:30 .1.00 WELLS TRIP 16:30.- 21:30 5.00 WELLS TRIP 21:30 - 00:00 2.50 WELLS PULD 10!23/2005 00:00 - 02:00 2.00 WELLS TRIP 02:00 - 04:00 2.00 WELLS MILL 04:00 - 05:30 1.50 WELLS MILL ~ 0530 - 09:00 3.50 WELLS CIRC 09.00 - 09:15 0.25 WELLS DEOT 09:15 - 11:30 2.25 WELLS MILL 11:30 - 13:30 2.00 WELLS CIRC I 13:30 - 14:30 ` 1.00 WELLSR CIRC Page 3 of 14 Spud Date: 6/26/2005 End: 11/13/2005 Group: Description of Operations WRKOVR Able to get return up DP, test failed, Rig down LRS. WRKOVR PJSM. PT lines to 4000 psi. Pump 5 bbls water. Stab stinger into cement retainer. Statt pumping cement. Pumped 20 bbls initally at 3 bpm 540 psi, starting OA pressure 320 psi, then closed bag. Got another 15 bbls away, pressure started bluilding. After 37 bbls cement. away, pressure spiked to 3700 psi, shut down pump. Appears retainer is plugged, bleed pressure off. Sting out of retainer, open annular, start pumping water, sting back into retainer, pump 5 bbls water, pressure spiked to 2000 psi. Bleed off, open pipe rams, sting out of retainer, rig down cement crew. WRKOVR Circulate cement out of DP and well bore. WRKOVR Circulate hole clean long way, total of 400 bbls. Rig down head pin. WRKOVR POOH w/ 3.5" DP and cement retainer stinger WRKOVR Out of hole with cement. string bottom hole assemble complete with stinger. Rig up Kelley in preparation to run in the hole and drill out ` retainer and cement. Cement retainer stinger after being taken apart at HES shop was full of sand. WRKOVR Rig up BHA to drill out cement retainer and cement. BHA consisting of. 8.5" tri cone Bit, two 7" Boot Baskets, One 8.5" Stabilizer, One 6.25" Drill Collar, One 6.25" Bumper Sub, One 6.25" 11.58' Oil Jar, Three jts. Of Heavy Waft 3.5" HT38 Drill Pipe. WRKOVR BHA picked up and ready to start in the hole with. 56 Stands of 3.5" HT-38 Drill Pipe, 12 jts. of Heavy Wall Drill Pipe, 9 Stands of HT38 Drill Pipe, 25 jts of 3.5" HT38 Drill Pipe to be picked up and drilled down with the Kelly as singles. WRKOVR RIH w/ 3.5" DP and milling BHA to 4075' WRKOVR Remove bails and elevators, torque all upper kelly connections to 48K. Test two kelly valves 250 psi / 3000 psi. Reinstall bails and elevatorss, blow down lines. WRKOVR Continue in hole with milling BHA. Tag cement above retainer 4650'. Get up and down weight 62UP / 31 DN. Mill apprxomiately 20 minutes, made 2' of hole. Make first 20 barrel) sweep, very little cement returns accross shakers. WRKOVR Continue milling operations on retainer, Able to mill through retainer, possibly very small of cement below retainer. Add single joint of DP, No restriction encountered. WRKOVR Add three additional single joint of tubing, same results, no restrictions. WRKOVR Start pumping second sweep (25 bbls) with rig pump and LRS @ 9 BPM purred a total of 430 bbls until returns cleaned up. WRKOVR Pressure test casing post drilling out retainer and cement to 4800' failed to pressure test OA tracking drill pipe pressure. Increase OA to 800 psi and shut down pressure slowly bleed down to 150 psi in 1 min. WRKOVR RIH with drill string to 4900', tagged up on cement stringer or RS nipple @ 4832' went threw with 7000 Ibs down wt. continued down to 4900' without seeing any more obstructions. WRKOVR Circulated up solids from bottom with 450 bbls and a 25 bbls Bio gel sweep. Recovered lots of sand and more pieces of the retainer. Rig up for infectivity test down the drill pipe and up the OA to open top tank. WRKOVR I Injection test down drill pipe threw top hole back up OA to open top ~ tank. Holding 300-psi back pressure with 9.6 ppg brine. 1.5-bpm = 90-psi DP and 380-psi OA, 2-bpm = 180-psi DP and 400-psi OA, 3-bpm 340-psi DP and 400 OA, 4-bpm = 480-psi DP and 400-psi OA. Total of 45-bbls of brine was pumped LRS pumped 45-bbls of diesel down Printed: 1122/2005 9:48:25 AM • ConocoPhillips Alaska Page 4 of ~~4 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: ~ Date From - To Hours Code Code Phase Description of Operations -- 10/23/2005 ~ 13:30 - 14:30 ~ 1:00 ~ WELLSF~ CIRC WRKOVR the OA to replace the diesel freeze protect. Next we pumped infectivity 14:30 - 21:00 ~ .6.50 21:00 - 21:30 .0.50 21:30 - 22:30 1.00 22:30 - 00:00 1.50 10/24/2005 00:00 - 02:00 2.00 02:00 - 03:00 1.00 03:00 - 07:00 4.00 07:00 - 08:00 I 1.00 08:00 - 08:30 I 0.50 08:30 - 10:00 ~ 1.50 10:00 - 11:00 I 1.001 CEME ~ 11:00 - 11:30 ~ 0.50 11:30 - 11:40 ` 0.17 11:40-12:40 I 1.00 12:40 - 13:15 0:58 13:15 - 15:30 2.25 15:30 - 16:30 ~ 1.00 16:30 - 18:00 ~ I 1.50 I 18:00 - 22:00 i 4.00 22:00 - 23:00 I 1.00 test into the bottom hole closing the OA valve and injecting in to the bottom hole. Injection leaved out at 2.2-bpm = 880-psi DP and 1100-psi OA. Conclusion is that both holes are open and do not seem to have been effected by the prior cement job. TRIP WRKOVR POOH with clean out string standing back drill pipe and laying down BHA. PULD WRKOVR Pull wear ring KURD WRKOVR Rig up for weekly BOP test BOPE WRKOVR Test BOP and choke 250 psi low ! 3000 psi high. Lou Grimaldi with AOGCC waived witness 8:30 PM on 10/23/05 ROPE WRKOVR Continue with BOP test, Lay down test equipment, install wear ring. TPULD WRKOVR Make up cement retainer BHA (cast iron retainerlsetting tool) TTRIP WRKOVR RIH wl HES EASYSV retainer and 3.5" HT38 DP with five stands of 3.5" HW DP above 1800' to setting depth of 4645', NFLT WRKOVR Set cement retainer with 36 turns to the right. Shear out of retainer- 132,000# and PUH 10'. Pressure test IA to 1,000 PSI for 10 min. Test passed. No flow to surface OA. FIT WRKOVR Sting back into retainer and perform injection test. 1 BPM @ 440 PSI DDP. 740 PSI OA CIRC WRKOVR Mix Biozan pills in pits. Blew air through all lines prior to pumping and or taking returns. Calibrate pressure gauges. Wait on second ASRC hand for assist on remote choke. Clean rig. Services blocks. SFTY WRKOVR Pre job safety meeting: Discuss all options and contingencies with contractors. SEOT WRKOVR Pressure test cement line and Schlumberger to 3,500 PSI. Prepare to begin cement program. Initial OA pressure = 280 PSI IDPP = 0 1 PUMP WRKOVR Cement to weight!!!!! 2 hours and 45 min to set. Pumps on line at 1 BPM to start. 350 PSI DPP. 2 BPM @ 530 DPP. Allowed 25 BBLS into 9 5/8" pipe below retainer prior to openning up OA. SQEZ WRKOVR Begin pressure schedule for OA b{eed off to allow cement to run into OA at a 1-1 ratio through known hole at 4,752' after allowing 25 BBLS of 15.7 PPG cement to flow into 9 5/8" casing below cement retainer. TRIP WRKOVR 1125 BBLS away 600 PSI DPP 1200 PSI OA. 132 BBLS total slurry away. 25 BBLS into 9 5/8" casing and 97 BBLS into 13 3/8" outer annulus. Estimated top of cement in OA = 3,127' RKB. Roughly 235' TVD difference. Un-sting from cement retainer with 10 BBLS left in drill pipe to lay cement plug on the top. Shut down pumps to perform this stage. More than {ikely that we only put 5-6 BBLS on top of retainer, Suspect that over balance of OA to 9 5/8" casing will leach into and possibly plug lower hole at 4,852-54' RKB. Final OA pressure = 50 PSI COUT WRKOVR Circulate 1 1/2 times bottoms up while moving pipe up and down to ensure that pipe is free. No cement returns to surface. RURD WRKOVR Rig down circulating system and clear rig floor for POOH. OTHR WRKOVR Go through stand pipe manifold and remove all cement from lines. Clear HCR and blow down all line on rig to ensure that no valves leaked j cement through. TRIP ~ WRKOVR POOH w/ 3.5" DP and HES setting tool, Lay down setting tool, Prep rig floor bit run. KURD ~ WRKOVR ~ Make up bit BHA, Oil jarsl8umper sub/Dril collar/Bit sub/Boot i .baskets/Mill tooth bit. Printed: 11l2Z2005 9:48:25 AM ~ • ConocoPhillips Alaska Operations Summary Report Page 5 of 14 Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Nam e: WORK OVER/R ECOM P Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM @conoc ophillip s.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Code Phase Description of Operations 10/24/2005 23:00 - 00:00 1.00 CEMEN -l TRIP WRKOVR RIH w/ 3.5" DP and bit BHA 10/25/2005 00:00 - 01:30 1.50 CEMEN ~ TRIP WRKOVR Continue in hole with cleanout BHA. 01:30 - 10:30 9.00 CEMEN TTRIP WRKOVR Rig on stand by above cement plug, waiting for cement to set up. Crews will use this to perform general maintenance and housekeeping 10:30 - 12:00 1.50 CEMEN T LOT WRKOVR duties. ~ Pressure test OA with tittle Red. Pumped 2.6 BBLS to pressure up to 1,500 PSI. Initial test failed due to air in the system. Second test passed. Lost 50-70 PSI in 15 MIN. Rig down Little Red and prepare to engage cement. 12:00 - 16:00 4.00 CEMEN DSTG WRKOVR After changing hydraulic filters out last night, system will not pressure up past 100 PSI. Mechanic in route. Not sure what the issues was. Pulled a control valve -reinstalled it and rig works. (((CODE 8))). 16:00 - 19:00 3.00 WELLS MILL WRKOVR .Hydraulics fixed. Prepare to RIH to begin milling. Pick up Kelly and test. _ _ __ 19:00 - 21:00 2.00 WELLS. M{LL WRKOVR Begin milling cement @4526'; circulating to pits at 4 bpm, sweeping the hole with 3# biozan pills. ROP approx. 30-50'/hr. Stacking 15k down wgt. 21:00 - 00:00 3.00 WELLS MILL WRKOVR Continue to mill 4630'. 10/26/2005 00:00 - 01:00 1.00 WELLS MILL WRKOVR Tag top of cement retainer at 4658'. Set 8k down, begin slowly milling through. Circulating at 4 pm. Not seeing much cement at shakers; call out Hot Oil for pump to up circ rate. 01:00 - 07:30 6.50 WELLS MILL WRKOVR Finished milling up retainer. Continue to RIH to 4,778' prior to testing OA. Hot oli on location. Rlg up and conduct pre-job safety meeting. Come online with hot oil and rig pump in tandem circulating hole at 6-7 bpm. 07:30 - 12:00 .4.50 WELLS MILL WRKOVR Target depth achieved: Prepare to pressure test 9 5!8" X 3 1!2" drill pipe annulus. Note that drilling became very easy after 4,755' RKB. Pump 1 1/2 volume for hole circulation. 12:00 - 13:00 1.00 WELLS CIRC WRKOVR Begin high rate bottoms circulation with little Red assist. 8.5 BPM @ 1,350 PSI DPP 25 BBL 3# biozan sweep. Returns = 1-1. 13:00 - 14:00 1.00 WELLS OTHR WRKOVR Pressure test 3 1/2" DP X 9 5/8" casing attempt failed. Able to inject into formation via lower leak at 4,852' at 4 BPM 1,600 PSI DPP. Blow down all lines and prep for OA test with Little Red. 14:00 - 15:30 1.50 WELLS OTHR WRKOVR Pressure test OA to 1,500 PSI with diesel. Test passed with 1.6 BBL to pressure up. 100 PSI loss at 30 MIN. Blow down all lines and re-rig Little Red to assist rig in pump rates. 15:30 - 18:00 2.50 WELLS MILL WRKOVR Continue milling up cement with Kelly. Min torque spikes to 4,500 ft/Ib indicate stringers. 18:00 - 22:30 4.50 WELLS MILL WRKOVR Continue RIH, still encountering stringers forcing us to mill through. Circulate bottoms up with rig pumplHot Oil every so often. Seeing large , pieces of rubber element from retainer at the shaker, however, only metal fines -- nothing substantial. 22:30 - 00:00 1.50 WELLS MILL WRKOVR Continue in hole, still milling-through cement stringers /pumping bio sweeps. 10/27/2005 00:00 - 05:00 ~ 5.00 WELLSR MILL f WRKOVR Continue to mill down to RBP. Able to clean out with out rotating on occasion, however, still encountering either cement stringers or parts of I the cement retainer requiring us to mill through. 05:00 - 08:00 3.00 ~ WELLSF~ CIRC ~ WRKOVR i Work down to tag at 5,423', pump 30 bbf bio sweep around and I ~ circulate out of hole. ~ 08:00 - 09:00 ~ 1.00 WELLSR CIRC I WRKOVR I Finnish circulation. Blow down lines and prepare to release Little Red. 09:00 -.13:00 ~ ~ 4.00 ~ WELLSR' ~ TRIP ~ WRKOVR ~ I Pump dry job. POOH with drill pipe while monitoring. hole conditions. Printed: 11/22/Z11~5 9:48:25 AM • ConocoPhillips Alaska Page ~ of ~a Operations Summary Report Legal Well Name: 1E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code S"b Phase Description of Operations Code 10/27/2005 13:00 - 14:30 1.50 WELLS TRIP WRKOVR Continue to POOH with milling string. Discuss with Anchorage the different options with the program. 14:30 - 16:00 1.50 WELLS PULD WRKOVR Lay down BHA and prepare to RBIH with reverse out BHA 16:00 - 17:00 1.00 WELLS SFTY WRKOVR Perform safety shut down with rig crew to discuss ConocoPhillips commitment to target 0 and their personal safety!! 17:00 -19:00 2.00 WELLS PULD WRKOVR Pick up reverse out BHA and prepare to RIH. 19:00 - 22:30 3.50 WELLS TRIP WRKOVR Begin RIH with cleanout BHA. Perform BOP drill. 22:30 - 23:15 0.75 WELLS SFTY WRKOVR Conduct company-wide safety stand down meeting with night shift rig personnel. Dlscuss safety issues and heighten awareness of attempt to achieve a zero incident culture. 23:15 - 00:00 0.75 WELLS TRIP WRKOVR Resume running back in hole with cleanout BHA. 10/28!2005 00:00 - 05:00 5.00 WELLS WASH WRKOVR Starting to see scraper work at at 5100'; losing wgt running in hole, clean pick-ups. Sit down @ 5229'; begin rigging up kelly. Begin circulating at 3 bpm and rotating in order to make hole (stacking 4-5k#), Appear to be scraping cement sheath from casing walls. 05:00 - 06:00 1.00 WELLS WASH WRKOVR Continue to scrape to 5,425'. 06:00 - 07:00 1.00 WELLS WASH WRKOVR Begin to POOH with scraper asym. PUH and monitor well. POOH. UP WT = 70K DWN WT = 40K. Rotating = 45K 07:00 - 07:15 0.25 WELCT OBSV WRKOVR Monitor well for flow. 07:15 - 08:30 1.25 WELCT OBSV WRKOVR Finish monitoring well. Thaw out air system and POOH. Clean rig floor and prepare to POOH 08:30 - 09:00 0.50 WELLS RURD WRKOVR Blow dwn Kelly and rig it back. 09:00 - 12:30 3.50 WELLS TRIP WRKOVR OOH with drill pipe begin breaking dwn BHA. 12:30 - 14:00 1.50 WELLS PULD WRKOVR Break out BHA. Take pictures and inserted into 1 E-170 work folder. Composite bridge plug at about 20% inside wash pipe. Cast iron cement retainer broken up in 2-3" chunks. Small pieces in boot baskets. Clear rig floor and prepare to pick up test PKR. 14:00 - 14:30 0.50 WELLS RURD WRKOVR Complete clearing rig floor. 14:30 - 16:30 2.00 WELLS PULD WRKOVR Begin installing Baker retrievamatic packer as per pipe tally. Tubing stop is installed in string to locate ~ 4,850.17' RKB. We had to steam retrievamatic packer to thaw out and lubricate moving parts. Surface test passed. Begin running in hole. 16:30 - 22:00 5.50 WELLS TRIP WRKOVR Begin running in hole with test packer assembly. 22:00 - 22:30 0.50 WELLS TRIP WRKOVR Sat down on trash at +-4840', slight overpull getting back off of it. No-go out 25' in on stand #78 (tbg stop located with a 1' of where it was suppose to + or - 4850' orig RKB). 22:30 - 23:30 1.00 WELLS DEQT WRKOVR Pull out stand #78, rack back. Install headpin. Set test packer, top of element at 4866' orig RKB. PUW=57k. Have difficulties getting packer set, only able to set do at most 15k. Pick up /set down hard...repeatedly, finally able to get set. Test to 2500 psi...good. 23:30 - 00:00 0.50 WELLS DEOT WRKOVR .pull up hole 5' to 4861' (top of element). Set packer and test. Hold 5 mins at 2500 psi--good. Bleed off. Pull up hole 2' to 4859'. Set packer and test....found leak between 4859' and 4861' orig RKB. Leak rate 1 bpm at 250 psi. Bleed off. 10/29/2005 00:00 - 01:30 1.50 WELLS DEOT WRKOVR Top of test packer element at 4859' orig RKB. Swap pump around to 9-5/8"xdrill pipe annulus and pressure up to 2500 psi. OA=O psi Hold for ~ ; ~ 30 mins. Good test...lost 30 psi in 30 mins. OA stil reading 0 psi. Bleed down. Discuss cleanout run W/O Engineer. 01:30 - 05:30 ~ 4.00 WELLS•~ TRIP I WRKOVR ;Begin pulling out of hole with test packer. 05:30 - 06:30 1.00 WELLSFj PULD WRKOVR i Break out and lay down BHA. Little bits of fiberglass in BHA. 06:30 - 09:00 2.50 RIGMNTiII RSRV WRKOVR ~ Rig service ,Crown, Blocks Prep to pick up washpipe. Change out f ~ ~ ~ handeling gear. 09:00 - 12:00 I 3.00; WELLSR PULD ~ WRKOVR ~, Make up washpipe BHA. Special care. pieces to small for rig Printed: 11/22/2005 9:48:25 AM • ConocoPhillips Alaska Operations Summary Report Page 7 of 14 Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11(13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Phase Code Description of Operations 10/29/2005 09:00 - 12:00 3.00 WELLSR II- PULD WRKOVR - - equipment on floor. Contact Baker and have shop make up smaller pieces. Changeout handling equipment. 12:00 - 14:30 2.50 WELLS TRIP WRKOVR Begin running in the hole with cleanout BHA. 14:30 - 16:30 2.00 RIGMNT RGRP WRKOVR Shut down to cut/slip drill line. 16:30 - 20:00 3.50 WELLS TRIP WRKOVR Resume trip in the hole. Perform BOP drill. 20:00 - 00:00 4.00 WELLS WASH WRKOVR 82 stands in the hole; begin picking up singles. Rlg up headpin and begin reverse circulating while stripping through the bag. Circulating at 4 bpm, begin working pipe in hole, however, having difficulties stripping in due to circ. press/pipe wgt. 10/30!2005 00:00 - 02:30 2.50 WELLS WASH WRKOVR Cont. rev-circulating/washing 4 bpm, 550 psi circ press. Lots of sand, composite, rubber, cement across shaker. Hole out of balance due to solids; U-tubing unable to make up newjts. Circulate hole around to clean up 2x bottoms up. Wash down to 5438'. Pump 30 bbl 3# bio sweep, circulate around. 02:30 - 04:00 1.50 WELLS WASH WRKOVR Watch returns at shaker until clean. 38 bbls brine lost while circulating/washing. 04:00 - 06:00 2.00 WELLS TRIP WRKOVR Begin pulling out of hole. 06:00 - 06:15 0.25 WELLS SFTY WRKOVR Crew change out. 06:15 - 08:00 1:75 WELLS TRIP WRKOVR Continue to POOH . At 1,880' pipe quit draining and is now pulling wet. 08:00 - 10:00 2.00 WELLS TRIP WRKOVR OOH with all drill pipe. Begin picking up handling equip for 8 1/4'' pipe. 10:00 - 11:00 1.00 WELLS SFTY WRKOVR I Flappers are plugged on bottom of 8 1/4" wash pipe. pre job safety meeting. Round up the proper PPE. Banna suites, goggles, rubber gloves. 11:00 - 12:00 1.00 WELLS PULD WRKOVR Lay down wash pipe. Prepare to clean rig. 12:00 - 14:30 2.50 RIGMNT RSRV WRKOVR Clean rig from wash pipe. 14:30 - 15:00 0.50 WELLS PULD WRKOVR Begin picking up retrieval head for RBP. 15:00 - 19:00 4.00 FISH TRIP WRKOVR RIH with retrieving head to pull RBP at 5445'. 19:00 - 20:00 1.00 F{SH FISH WRKOVR PUW=66k, do=28k. Wash down 5430 to RBP at 5445'; latch up and pick up, see slight drag to 70k: Run back in hole past set depth ensure RBP is latched. 20:00 - 22:00 2.00 FISH CIRC WRKOVR Pull up hole 15' and begin circulating bottoms up to ensure no gas was trapped under RBP. 22:00 - 00:00 2.00 FISH CIRC WRKOVR Resume pulling out of hole. At 4980', hanging up on trash/debris. PUW=65k, dragging to 100k, breaking back. Rig up to rev-circulate. Circulate 2 bottoms up @ 4 bpm, resume pulling out of hole. Well U-tubing badly due to solids concentration in drill pipe. Move pipe 4-6' make sure pipe is free; swap to circulating the long way. 50 bbls away, ' ~ , still dragging. Resume circulating the shut down and pull up hole 10 long way @ 4 bpm, 420 psi. Pump 25 bbl 3# bio sweep. 10/31/2005 00:00 - 02:30 2.50 FISH CIRC WRKOVR Cont. Circulating 25 bbl 3# bio sweep around the long way @ 4 bpm. 02:30 - 06:00 3.50 FISH CIRC WRKOVR Begin pulling out of hole. Still dragging heavy in a few spots. 06:00 - 10:00 4.00 FISH TRIP WRKOVR Trip OOH 10:00 - 11:00 1.00 FISH RURD WRKOVR At surtace; break down RBP. Send pictures to Anchorage of missing rubber. 1/2" gouge in gauge ring. Rubber element missing is .17' tall, 8 ~ ` 3/16" OD, 6 7/16" ID. Prepare to make fish /cleanout run. Ordered out 8 1/2" wash pipe with flapper bit. Pull wear ring and prep for BOP I I ~ test. 11:00 - 15:30 4.50. WELCTL; BOPE WRKOVR i Conduct BOP test; 250 low test, 3000 high. Test witnessed by state ~ I j rep, John Spaulding. Also checking for rubber trapped in gates. 15:30 - 16:00 0.50 WELLSF~ SEOP WRKOVR ~ Install wear ring. 16:00 - 19:00 I 3.00 WELLSF~ RURD I WRKOVR ~ Begin making up Yev-circulating junk basket BHA for cleanout run. j ;19:00 - 00:00 , 5.00 i WELLSR TRIP ; WRKOVR ; Begin RIH with cleanout BHA. Printed: 11!2272005 9:4825 AM r1 r~ ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: WORKOVER/RECOMP Start: 1 0/1 712 0 0 5 Contractor Name: N3SCM@conocophillips.com Rig Release: 11!13/2005 Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Phase Code Page 8 of 14 Spud Date: 6/26/2005 End: 11/13/2005 Group: Description of Operations 11!1!2005 00:00 - 01:15 1.25 WELLSF ~TRIP WRKOVR Continue RIH with cleanout BHA. PUH; set down at 3565'. PUH, clean II pickup. Rig up to rev-circulate. Circulate bottoms up plus @ 4 bpm, resume RIH. Obstruction appears gone. RIW 28k, PUW=65k. 01:15 - 03:00 1.75 WELLS TRIP WRKOVR Lose wgt again at stand #72 (4600') roughly last spot we pulled heavy through last night. Install head pin and rig to rev-circulate. 03:00 - 05:00 2.00 WELLS WASH- WRKOVR Begin rev-circulating at 4 bpm; circulate bottoms up plus. Remove head pin and begin running back in hole. Set down 30' deeper. Remove a single and make up head pin again; begin stripping through bag while running in rev-circulating at 4 bpm. 05:00 - 07:00 2.00 WELLS WASH WRKOVR Continue RIH. Still seeing an occasional "bobble", possible pushing something down with us. Stop every 4-5 stands in and circulate bottoms up at 4 bpm @ 420 psi, plus. RIW=25k, PUW=70k. Seeing lots of sand at the shaker, CP=650 psi. Continue to circulate until it cleans up, pumping 3# biosweeps. 07:00 - 08:00 1.00 WELLS WASH WRKOVR Resume running in hole, rev-circulating bottoms up plus after every 5 stands. Change out shaker screens. 08:00 - 11:30 3.50 WELLS WASH WRKOVR Have RIH to 5460'; continue to rev-circulate at 4 bpm. Pump 25 bbl bio sweep; pump one in as one exits. Last sweep was clean, nothing back on this sweep. 11:30 - 12:00 0.50 WELLS TRIP WRKOVR Blow down lines and start POH. 12:00 - 15:00 3.00 WELLS TRIP WRKOVR Start hanging up @ 4920'. Pulled 30K over to keep moving. Dragging up to 4790'. Broke free back down to normal string wt. Lowered back down to 4920' start taking wt. Set all of string wt down. Picked up dragging back up to 4790'. Pulled free. POOH. 15:00 - 16:30 1.50 WELLS TRIP WRKOVR Finish POOH laying down BHA. Cleaned out junk basket. Had several approximately 1"pieces of cast from retainer. 16:30 - 23:30. 7.00 WELLS TRIP ~ WRKOVR Remove casing scraper from rev-circ BHA, keep 8-5/8" string mile in place for drift. Swap out finger catch back to flapper style. Begin RIH. 23:30 - 00:00 0.50 WELLS TRIP WRKOVR 75 stands in hole; Rig up to circulate. 11/2/2005 00:00 - 01:00 1.00 WELLS WASH WRKOVR Cont. 75 stands in the hole. Tie in ASRC pump to assist with rate. begin running in singles stripping through bag while reverse circulating through tie-back area. Having difficulties stripping through bag, no pipe wgt. RIW=25k, PUW=70k. 01:00 - 02:45 1.75 WELLS WASH WRKOVR 75 stands in and 2 singles (4855') tag up. Begin rev-circulating at 7 bpm, pump 2 bttms up. Bleed off, open bag and make several drift passes through tight spot (trash) with string mill. Resume stripping in single #3 while rev-circulating at 3-5 bpm, seems clear. Note: did see hose jump as large piece of debris was washed to surface, unable to find at the shaker. Hole take approx 0.75 bpm while circulating at 7 bpm, 620 psi. 02:45 - 04:30 1.75 WELLSR WASH i WRKOVR Strip down single #4 to 4935' while rev-circulating 3-5 bpm. Pull back i out of hole through tie-back while rev-circulating at 5-6 bpm, laying the 4 singles back down. 04:30 - 05:00 i 0.50 WELLS TRIP WRKOVR ; Run back in hole, set down (12k) at 5010'. Try to work into pipe. RIH I to 5030' without seeing anything else. 05:00 - 08:00 3.00 WELLSR' CIRC , WRKOVR i Rig up head pin and begin reverse-circulating at 7-8 bpm. Pump 25 bbl ! ~ f high-vise sweep and circulate around. Returns showed approx. 10 gals of sand and metal. shavings. Fluid losses increased to approx. 1.25 08:00 - 09:00 ~ 1.00, WELLSa I ~ TRIP i WRKOVR i BPM. Shut down pumps, blow down lines, prep to POOH. Pull out of hole slow looking for any drag with ASRC pump on standby. i i I Pulled up to 3700' no indications of drag or trash. Released ASRC I I 09:00.- 13:00 j 4.00 ~ I ~ WELLSR ~ ~ TRIP WRKOVR ~ I pump. Continue to pull out of hole. Layed dow BHA, cleaned out reverse junk Printed: 11/22/2005 9:48:25 AM • ConocoPhillips Alaska Page ~ of 1~ Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Phase Description of Operations Code 111/2/2005 09:00 - 13:00 13:00 - 16:30 16:30 - 21:30 21:30 - 22:00 22:00 - 00:00 4.00 3.50 5.00 0.50 2.00 TRIP WRKOVR basket. Retrieved approx. 1 cup of composite material and small cast debris. PULD WRKOVR ~ Picked up the EXPatch and running/setting tool and made up same. TRIP WRKOVR PJSM covering details of running the EXPATCH. RIH with the EXPatch and setting assembly on the 3-1/2" HT38 drill pipe. TRIP WRKOVR 55 stands in the hole; everything looks good, hole appears clean to here. Order out inhibited brine, verify timing of Hot Oil pump. TRIP WRKOVR 75 stands (plus a single) in the hole. Have pre job review depths/ setting procedure with Baker reps/completion eng/toolpusher/etc. Discuss corrosion inhibtor placement; decide to omit from procedure -- lvirtually noway to spot and concern over washing trash back into patch setting area. SFTY WRKOVR 27k RIW, 57k up. On depth at 25.5' in on stand #75 (single in hole as well) placing .BHA at 4873.67, top-of element on seal jt at 4849'. Conduct pre job with rig crew /Hot Oil regarding setting procedures, (pressures, safety. CIRC WRKOVR Drop setting ball and make up headpin. P/T Hot Oil /standpipe to 4500 psi. Come online with Hot Oil @ 1 bpm, 150 psi. CIRC WRKOVR 25 bbls away. Bring rate up to 1.5 bpm. CIRC WRKOVR 30 bbls away, ball on seat, see pressure rise. Drop rate to 0.5 bpm and begin setting sequence. At 3500 psi, see piston stroking, cont. up to 4500 psi--movement has stopped. Shut down and bleed off. RIH w/ pipe, verify 11' of travel. Re-attempt to stroke patch further...pressure up to 5000 psi on drill pipe. No movement. Confer w/ Baker Reps. Appears we are stacked out expanding through RS nipple. At max. pressure for rig equipment and Hot Oil pump. OTHR WRKOVR ~ Regroup and explore options. Call out cement pumper; find they are ~ currently working at Doy 141, but finishing soon. Will attempt to set patch at higher pressure (6-7k). EOIP WRKOVR On stanby for cement pumper. Perform rig maintenance. Conduct H2S dril{. RURD WRKOVR RU Schlumberger hardline from pump truck to headpin. Tested lines to 6000 psi PLGM WRKOVR Opened valve. Filled lines with 1.5 bbls. Press up to 5500 psi short ~ stroked seal jt thru RS nipple @ 4852' press dropped down to 3300 psi to complete the stroke. Bled press off, opened valve, slacked off 8'. Total of 19' has been swedged leaving 10' remaing to swedge. Pulled i cone back thru RS nipple and liner hanger. Pulled cone thru RS nipple with 140K. Picked up to upper hanger and first tried with 250K, 190K over pull. Worked up to 280K max. Pulled free approx. 1' still stuck. Slacked off to 240K, pulled free back to string wt of 60K. Decision made to POOH, run back with 7.915" cone with jars and collars. RURD WRKOVR RD hardline and prep to POOH. Closed bag and press test 9-5/8" casing and patch to 1000 psi held for 15 min. TRIP WRKOVR i POOH with workstring and Baker EXPatch running tool. Pull wet, i dropped ball to open circ sub. Continue to POOH. RURD WRKOVR At surface; break down BHA...swap out swedge with back-up which was turned down 1/100" at BakerMachine. Make up new BHA adding (2) drill collars, jars, and accelerator. TRIP ~ WRKOVR ~ Begin RBIH with new swedge/BHA. TRIP i WRKOVR Continue tripping in hole with patch setting BHA. Ca0 out SLB cementers for pump support. PLGM , WRKOVR ,Tag up 23' in on top joint of stand #74 (plus a single) putting us on 11/3/2005 100:00 - 00:30 I 0.501 WE 00:30 - 00:50 0.33 WE 00:50 - 01:00 0.17 WE 01:00 - 02:00 1.00 WE 02:00 - 03:00 1.00 WE 03:00 - 06:30 3.50 WA 06:30 - 09:45 3.25 WE 09:45 - 11:15 1,50 WE ' 11:15 - 14:00 I 2.75 WELLS 14:00 - 18:50 4.83 WELLS 18:50 - 21:30 I 2.67 j WELLS i 21:30 - 00:00 ~ 2.50 WELLS 11/4/2005 ~ 00:00 - 02:00 2.00 I WELLS 02:00 - 03:00 1.00 ~ WELLS Printed: 71/Lll'LUUS y:4t3:L~AM • ConocoPhillips Alaska Page 10 of 7a Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 .Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Code Phase Description of Operations 11/4/2005 02:00 - 03:00 1:00 WELLS PLGM WRKOVR depth. Note: drifted through top of patch cleanly. Pull mousehole, rlg up cementers through hole in floor. P!T pump line to 6200 psi--good. Conduct pre-job safety meeting. 03:00 - 04:00 1.00 WELLS PLGM WRKOVR Come online w! SLB cement pumper, pressure up to 2200 psi to 1800 psi...see expansion tool stroke remainder of the way out of patch- 10'(visually saw it pop through). Bleed off, RIH and bury stand #74 ... appears to be clear. Pick up a single and RIH to 4882' for drift (swedge cone OD=7.915"). ~ 04:00 - 05:00 1.00 WELLS TRIP WRKOVR Rig down SLB pumpers; clean up rig floor. Begin POOH. Hang up again with swedge in area of lower hanger. Pull 150k, pop through. POOH above patch, (2) stands and a single, and rig up for MIT. 05:00 - 06:30 1.50 WELLS DEQT WRKOVR Close bag; bring up 9-5/8 x drill pipe annulus press to 2500 psi. Monitor and chart OA press= lost 0 psi in 30 min. Bled off press. Dropped ball to open tire. sub, blew out at 1500 psi. 06:30 - 13:00 6.50 WELLS PULD WRKOVR POOH standing back drill pipe. LD EXPatch running tools. Clear rig floor and prep for running retrieving tool for RBP. 13:00 - 00:00 11.00 WELLS TRIP WRKOVR Make up retrieving tool on workstring, RIH 11/5/2005 00:00 - 01:00 1.00 WELLS TRIP WRKOVR 145 stands, 3 singles (9275'); PUW=105k, RIW=20k. Make up headpin. 01:00 - 02:30 1.50 WELLS RURD WRKOVR Rig up 2" hose to hardline in teller to kill tanks. Line up trucks from displacement. Conduct pre job safety meeting w/ ARSC, rig crews, Baker rep. 02:30 - 08:15 5.75 WELLS CIRC WRKOVR Rev-tire 25 bbl visGcaustic sweep chased by new 8.9 brine, circulating to kill tanks @ 4.5 bpm. Recip pipe in between truck swaps. Pumped until fluid cleaned up, switch last 100 bbls 8.9 ppg to pits. 08:15 - 14:00 5.75 WELLS TRIP WRKOVR PU to get up wt =120K. Attempted to run in and latch onto RBP, stacked out all of wt and would not go down. PU 5' twice and lost 5' each time, would not go down. Pulled drill pipe out of hole with the intention of adding drill collars and heavy wt pipe to push down and retrieve RBP. Pulled up to 8170' and attempted to go down but stacked out. 14:00 - 21:00 7.00 WAITON OTHR WRKOVR Shut down, closed rams and pressured up to 1000 psi test casing. Held OK. Ordered 290 bbls 8.9 ppg Lube. Wait on Lube. 21:00 - 22:00 1.00 WAITON OTHR WRKOVR Brine on location; still waiting on load os "slick" fluid. 22:00 - 23:00 1.00 WELLS SFTY WRKOVR Fluid on loc. Spot up trucks. Conduct pre job safety meeting. 23:00 - 00:00 1.00 WELLSR CIRC WRKOVR Come online w/ rig pump circulating Flo-Pro w/3% EP Lube Friction reducer around the long way back to the pits. 290 bbls tube pumped, displace with 54 bbls new 8.9 brine. 11/6/2005 00:00 - 00:30 0.50 WELLS CIRC WRKOVR Continued. Circulating Flo-Pro w/3% EP Lube Friction reducert around to lubricate. 290 bbls pumped, chased with 50 bbls of 8.9 brine (left 5 ~ bbls in dp). Perform BOP drill. 00:30 - 02:00 1.50 WELLS TRIP WRKOVR RIH w/drill pipe...having to work in hole PUW=108k, RIW=15k. Run stand 131 in hole, begin picking up heavy wgt pipe. Run 15 jts of heavy wgt in; back on stands. 02:00 - 03:00 1.00 WELLS CIRC WRKOVR Drillpipe running over while tripping; stop, rig up head pin and mix up 1 03:00 - 04:30 I 1.50 ` WELLS TRIP I ~, WRKOVR ~ dry job. Resume tripping back in hole. 04:30 - 07:00 { 2.50 WELLSF~ WASH WRKOVR I Tag up approx. 30' above RBP. Review tallies, discuss. Rig up to wash ~ down to top of RBP. Begin circulating at 3 bpm, 300 psi .See pipe "drop through" top of 7" liner slack off 10', tag bottom of 7" liner tieback ~ ~ sleeve @ 9326'. Circulated @ 3 bpm w 300 psi tied to work past ~ ~ ~ several times but would not go. 07:00 - 10:30 ; 3.50; WELLSR PLGM I WRKOVR ', PU Kelly and test. printed: 11/22/2005 9:4825 AM ConocoPhillips Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: WORKOVER/RECOMP Contractor Name: N3SCM@conocophillips.com Rig Name: Nabors 3S Date From - To Hours Code Code P}ease 11 /6/2005 11 /7/2005 10:30 - 11:30 ~ 1.00 ~ WELLS PLGM 11:30 - 13:00 1.50 WELLS OBSV 13:00 - 00:00 11.00 WELLS TRIP 00:00 - 03:00 3.00 WELLS TRIP 03:00 - 04:30 1.50 WELLS TRIP 04:30 - 15:00 10.50 WELLS PULD 15:00 - 22:00 7.00 CMPLTN RUNT 22:00 - 00:00 11/8!2005 00:00 - 03:00 2.00 I CMPLTN RUNT 3.00 I SLIN 03:00 - 05:00 2.00 CMPLTN TRIP 05:00 - 18:30 13.50 CMPLTN TRIP 18:30 - 20:12 ; 1.70 ~ CMPLTN PULL 20:12 - 20:31 1 0.321 CMPLTNI DEOT 20:31 - 22:00 i 1.48 i CMPLTN; CIRC 22:00 - 00:00 I 2.00; CMPLTNi PULL Start: 10/17/2005 Rig Release: 11/13/2005 Rig Number: Page 11 of 14 Spud Date: 6/26/2005 End: 11 /13/2005 Group: Description of Operations WRKOVR Ran down tagged liner top again. Rotate off, ran 10' tagged bottom of tie back sleeve again. Broke circulate @ 3bpm w/ 380 psi. Rotated thru, RIH and. tagged RBP @ 9352'. Pressure increased to 440 psi. Shut pump down. PU pulled RBP 5' up hole. Wait 5 min. let plug relax. Slacked off 6' lower than where we picked up plug. WRKOVR Picked up on kelly, monitored well. Fluid dropped. Lost 19 bbls in 5 min. Filled hole, monitored well, losing fluid at approx. 25 bph WRKOVR Began POH laying down workstring. Called state to discuss weekly BOP testing due Monday (tomorrow); state (Chuck Sheve) waived need if running new completion. Fluid loss at midnight approx. 16 bbls/hr. WRKOVR Cont. Pulling out of hole with RBP, pumping hole fill every 10 jts. WRKOVR Fluid loss has dropped to approx. 10 bblslhr. WRKOVR At surface with RBP; break out and lay down BHA. Begin running in hole the remaining 5 stands of drill pipe in the derrick and pull back out breaking singles, laying down. Lay down Kelly,pull wear ring, clear rig floor. Unload pipe shed and begin bringing ESP equipment into pipe shed to warm up. Bring in last 41 jts. 4-1/2" IBTM, strap and drift. RU power tongs for 4.5" completion. Change Xover for floor safety valve.. WRKOVR Rig up spooling unit, raise cable sheave and string power cable. Pick up ESP completion assembly. Make up per welt plan ! Centrilft specifications. Fluid losses approx 3 bbl / hr. WRKOVR Ready to run in hole. Rlg up wireline equipment; prep to run pump and packoff assembly in hole: Make up last of pump assembly and run in hole with pump / packoff on slickline. WRKOVR Continued. Running in hole with slickline w/4.5" GS & 38.5'OAL ESP -Pump. Set pump. RIH w/ 4.5" Packer stinger assy. 103" OAL, 94" to KOBE Knock off to same tap down shear off beat down more. RIH w/3" SS ~ D&D test tool to top of packer shear off POOH. Pressure tested packer to 1000 psi good test. RIH w13" JDC to 106' WLM, latch test tool, POOH. RIHw/4.5" GS & 4.5" sloip stop to top of packer. POOH and rig down Halliburton and resume running in hole with completion. Install clamps per well plan / Centrilift recommendations. ~ WRKOVR Rig up hose to fill tubing off of charge pump. Well taking approx. 1 bbl/hr. WRKOVR Continue running in hole with ESP completion. PJSM with day crew. Install GLM @ 8669' w/3000 psi SOV & @ 2090' w/Dummy. Filling tubing with fluid every 1000'. Ran with cable clamps on every collar of first 4100' of tubing and every other collar on connections above the patch @ +/- 4800' MD. Performed electrical inspection /test on ESP cable and TEC wire every 1000'. Saw a small wt jump when GLM went thru top of casing patch. Test ESP cable, good test. Continue in hole. WRKOVR Meg report on ESP cable shows direct ground: POOH to last meg depth of 5,372'. We will re-meg cable at this depth to confirm. If cable still megs negative. Continue to POOH and monitor cable for physical damage. Alert wire line for possible pump extraction and GLV change out. WRKOVR Meg test failed. Prepare to shear out valve at GLM #1. Shear out pressure is 3,000 PSI. WRKOVR Unable to shear the SOV. Several attempts of pressures up to 4,500 PSI with no fuck. Prepare to POOH wet. New gloves on location to assist in pulling seal rings from tubing. WRKOVR ~ Continue to POOH with completion string. Wireline on call to assist ;with SOV and pump. Printed: 11/22/2005 9:48:25 AM • • ConocoPhillips Alaska Page ~2 of ~4 1.50 ~ CMPLTN PULL ~ WRKOVR ~ Pulling out of hole, found bad clamp at 1357, cable visually good Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005. End: 11/13/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Code P'nase Description of Operations 11/9/2005 00:00 - 12:30 12.50 CMPLTN PULL WRKOVR Continue POOH wet. Centrilift hand says that a kink in the ESP control cable at +-3,831' RKB. This will need to be repaired while RBIH. 12:30 - 14:00 14:00 - 18:00 18:00 - 21:00 21:00 - 23:00 23:00 - 00:00 11/10/2005 00:00 - 02:00 02:00 - 06:00 06:00 - 11:00 11:00 - 18:00 18:00 - 23:00. 23:00 - 00:00 11 /11 /2005 00:00 - 02:00 02:00 - 08:00 08:00 - 11:00 ~ shape at this point. Continued to pull found camp missing from connection @ 1201', and cable severed. Cable bad in several places and clamps mangled up. Lost 1 clamp only. 4.00 CMPLTN PULL WRKOVR Layed down GLM. RU Halliburton 3.00 CMPLTN SLIN WRKOVR Pull pack off with wireiine. Several issues wi#h pump attempting to pull with pack off. After 35 spang licks was able to pull packoff. Pull pump to surface and dog collar. Release HES. Top stage of pump is seized up.. 2.00 CMPLTN PULL WRKOVR Pull motor slowly to surface watching for lost clamp. Damage to clamp above. handling. pup.. Lay down motor and ESP cable. i.00 CMPLTN OTHR WRKOVR OOH. Clean rig floor and prepare for test plug to be inserted for BOPE gate opening. 2.00 WELCT NUND CMPLTN Set plug in landing profile and open gates to visually inspect for lost Cannon clamp. No clamp. Reseal gates and prepare for BOPE test. Test waived witness by Lou Gramaldi. 4.00 WELCT BOPE CMPLTN BOPE test. Test Variable boreRams, blinds, and valves to 250/3000 psi and annular to 250 i 2500. Install wear ring. Inspect KIC tent for storage of power swivel and power pack. 5.00 WAITON EQIP CMPLTN Waiting on Baker Junk Shoe and Baker KB retrievable packer & Kobel Knockout plug. 7.00 CMPLTN OTHR CMPLTN Pulled wear ring back out. Removed ESP cable from spooler, installed new 7000' ESP cable in Spooler. 5.00 WAITON EQIP CMPLTN ~ Continue waiting on Baker Junk Shoe and Baker KB retrievable packer & Kobel Knock out plug. 1.00 CMPLTN SFTY CMPLTN Pre-job safety meeting. Load pipe shed with BHA and confirm straps. 2.00 WAITON ORDR CMPLTN Discuss with anchorage issues with junk catcher fluid bypass. Tool is 6.001 CMPL' Operations Summary Report PULD 3.001 CMPLTNI PULD 11:00 - 23:30 12.50 CMPLTNI RUNT good to go. CMPLTN Begin Centrilift installation procedures. PU 7.5" OD junk catcher on bottom of motor centralizer, pressure sensor and motor. Fill motor with prescribed lubricant and allow for air to pass. Pick up Seal Section and assemble to the motor section. Service Seal Section. Splice in motor lead to new ESP power cable reel. Feed motor lead extension cable through sheave to floor and connect. Lower unit in well, connect pump receptacle assy. to top of seal section. Continue to run assy. in hole installing Cannon single-channel cross coupling cable clamp on each jot. Install the a-well Discharge Sub and connect capillary to pressure sensor. Run 2jt. 4.5" tubing. CMPLTN RU Halliburton Slick line. Fill hole. RIH with pump assembly on slick line and set pump in pump housing. Ran pack off stinger, tubing pack off, press test to 1000 psi and run tubing stop. RDMO slick line. CMPLTN PU and RIH with 1jt.4.5" tubing w/ 4.5" Baker KB retrievable packer and Kobe knock out plug already installed in jt to allow the tubing to be run dry to decrease drag on tubing clamps. Continue RIH with ESP assembly on 4.5" tubing installing Cannon single-channel cross-coupling cable clamps on each jt. Witnessed no bobbles entering patch at 4,842'. Tagged up at 5,095'. Set 5K dwn wt. on pipe. Pulled up 10' for re-attempt with max wt 5K DWN. Making no hole. Called Anchorage and discuss options. Decided to use 16,000# as max DWN cwt. Current pick up wt = 36,000#, free float WT = 26,000#. Blocks = rnntea: i vtulwo a:gtt:~o ww • ConocoPhillips Alaska Page 13 of ~~ Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: WORKOVERlRECOMP Contractor Name: N3SCM@conocophillips.com Rig Name: Nabors 3S Date .From - To Hours Code Code Phase 11/11/2005 111:00 - 23:30 12.501 CMPLTNI RUNT CMPLTN 23:30 - 00:00 I 0.501 WAITONI ORDR I CMPLTN 11/12/2005 00:00 - 01:30 1.50 WAITON ORDR CMPLTN 01:30 - 02:00 0.50 CMPLTN SFTY CMPLTN 02:00 - 02:30 I 0.501 CMPLTNI PULL CMPLTN 02:30 - 03:00 0.50 CMPLTN RUNT i CMPLTN 03:-00 - 0330 0.50 CMPLTN KURD CMPLTN 03:30 - 08:00 I 4.501 CMPLTNI RURD I CMPLTN 08:00 - 09:30 I 1.501 CMPLTNI RURD I CMPLTN 09:30 - 11:00 ! 1.501 CMPLTNI RURD 1 CMPLTN 11:00 - 18:00 f 7.001 CMPLTNI PULD I CMPLTN 2$:30 - 22:00 0.50 WELCTLj NUND CMPLTN 22:00 - 00:00 11/13/2005 00:00 - 02:10 02:10 - 04:00 04:00 - 04:30 2.00 WELCT NUND CMPLTN 2.17 WELCT NUND CMPLTN 1.83 WELCT BOPE CMPLTN 0.50 CMPLTN RURD ,CMPLTN 04:30 - 07:00 2.50 ~ CMPLTN NUND I CMPLTN 07:00 - 08:30 1.501 CMPLTN DEQT ~ CMPLTN 08:30 - 15:00 I 6.50 i CMPLTNI NUND !CMPLTN Spud Date: 6/26/2005 Start: 10/17/2005 End: 11/13/2005 Rig Release: 11/13/2005 Group: Rig Number: Description of Operations 10K: Two attempts at 16K dwn wt. No movement. Anchorage to discuss with assets. Wait on decision from asset. Monitor well. Bring tubing hanger assembly into pipe shed to warm up for inspection. In discussions with Anchorage as to which avenue to pursue. Build new completion tally to reflect discussions with Anchorage as to completing well as-is-where-is. Prepare to POOH above pre-installed GLM 6 joints away and pull GLM out of origins! completion string. RBIH and complete well no deeper than 5,076' RKB. Hold pre job safety meeting for everybody to be on same page. POOH, remove GLM and replace with joint number 219 @ 27.82' long. Up wt = 36K. 15K overpull to begin POOH. Pull out GLM and replace with tubing joint 219: RBIH to 5,043' to begin installation of tubing hanger. Orient tubing hanger and steam for thaw assist.. Prepare for ESP. pigtail install. Make final splice of ESP cable to wellhead penetrator. Test cable & penetrato, good test. Double check orientation of hanger. Land tubing with extreme caution. RILDS. Back out landing jt. and wash out and drain BOP stack, lay down landing jt. Test hanger body seals and void to 5000 psi. Rig down sheave from derrick and Elephant trunk hose. Spool up cable end into spooler. RU tools to lay down 22 stands of 4.5" tubing out of derrick thru mousehole. RU tools and lay down 22 stands of 4.5" tubing out of derrick thru mousehole. Empty pits. Load out trucks with tubing and tools to go back. Pull mousehole, LD. Rig off BOP's and prepare to install production tree. i Hold meeting in cellar. Production tree is not Vining up with penetrator. 'Notice that looking into casing valve you can see 3/4" of hanger that ~ has rotated clock ways. Called AOGCC and asked Lou Grimaldi for permission to re-install BOPE and pen`orm a body pressure test along with a function test of the rams. Permission granted with the exception of, (We are only allowed to pick up and turn the hanger. If further work is needed we will sit back down RILDS and re-visit the possibility of a Full BOP test.) Begin to re-install BOP. Continue to rig up BOP and prepare for test. Begin BOP test. RIH wllanding joint pick up tubing hanger 4" and inguaged alignment pin. Land hanger. RILDS. Confirm by looking in casing valve at full guage hole. Tested upper and lower seals on hanger to 5000 psi. NDBOP. Cleaned void area, inspect landing head. Test penetrator and ESP cable, showed 30K OHM to ground. Called out 2nd service hand to double check readings determined that Phoenix guage needed to be check with reverse polarity. Retested reversing polarity and tested good. NU tree. Test hanger void / packoff to 250 /5000 psi. Pull BPV install 2-way check. Attempt to test tree, press up to 5000 psi and discovered hairline crack in tree bonnet just behind penetrator. Pressured up again to confirm leak, same results. Confirmed with VETCO Gray no replacement on slope. Change out 2-way check valve with BPV. Clean Printed: 11/22/2005 9:48:25 AM ~ • ConocoPhillips Alaska Page ~a of ~4 Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Spud Date: 6/26/2005 Event Name: WORKOVER/RECOMP Start: 10/17/2005 End: 11113/2005 Contractor Name: N3SCM@conocophillips.com Rig Release: 11/13/2005 Group: Rig Name: Nabors 3S Rig Number: Date From - To Hours Code Sub Phase Description of Operations 111 /13/2005 Code 08:30 - 15:00 6.50 CMPLTN NUND CMPLTN itree and cellar. Released rig @ 1500 hrs on 11-13-2005. 15:00 - 19:00 4.00 MOVE MOVE CMPLTN Prepare rig for move to 1 E-166. Scoped derrick down @ 1700 hrs. 19:00 - 20:00 1.00 MOVE MOVE. CMPLTN Move rig off of 1 E-170 and begin preparations for spotting up on 1 E-166. 20:00 - 00:00 4.00 MOVE ~ MOVE CMPLTN Continue spotting rig on 166. Printed: 11!22/2005 9:48:25 AM DEFi~si33R~-e Halliburton Sperry-Sun Western North Slope ConocoPhillips • Kuparuk 1 E 1 E-170L 1 Job No. AK-ZZ-0003778283, Surveyed: 21 August, 2005 Survey Report 26 September, 2005 Your Ref.•500292326460 • Surface Coordinates: 5959339.91 N, 549889.64E (70° 17' 58.8873" N, 149° 35' 45.4351" V~ Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 959339.91 N, 49889.64E (Grid) Surface Coordinates relative to Structure; 420.32 S, 2.66 W (True) Kelly Bushing Elevation: 111.05ft above Mean Sea Level Kelly Bushing Elevation: 111.05ft above Project V Reference Kelly Bushing Elevation; 111.05ft above Structure ORIL!_ING sERVtcES Survey Ref: svy2165 A Haflihurton Company Halliburton Sperry-Sun ' Survey Report for Kuparuk 1 E- 1 E-170L 1 Your Ref: 500292326460 Job No. AK-ZZ-0003778283, Surveyed: 21 August, 2005 Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 9777.64 80.350 181.520 3220.39 3331.44 8300.37 S 870.32E 5951045.50 N 550815. 05 E 9878.87 88.400 181.660 3230.30 3341.35 8400.99 S 867.53E 5950944.87 N 550812. 93 E 9974.37 91.350 180.890 3230.51 3341.56 8496.45 S 865.41E 5950849.39 N 550811. 44 E 10025.28 93.400 179.190 3228.40 3339.45 8547.31 S 865.37E 5950798.53 N 550811. 74 E 10121.09 92.830 177.830 3223.19 3334.24 8642.95 S 867.86E 5950702.91 N 550814. 86 E 10220.42 89.320 176.320 3221.33 3332.38 8742.11 S 872.93E 5950603.79 N 550820. 59 E 10321.41 88.770 176.520 3223.01 3334.06 8842.89 S 879.23E 5950503.05 N 550827. 56 E 10420.67 89.130 177.810 3224.83 3335.88 8942.01 S 884.14E 5950403.97 N 550833. 13 E 10519.28 88.530 178.750 3226.84 3337.89 9040.55 S 887.10E 5950305.44 N 550836. 74 E 10618.88 90.930 180.910 3227.31 3338.36 9140.14 S 887.39E 5950205.86 N 550837. 70 E 10718.77 90.740 183.560 3225.86 3336.91 9239.93 S 883.50E 5950106.05 N 550834 .46 E 10817.38 91.490 184.730 3223.94 3334.99 9338.26 S 876.37E 5950007.67 N 550827. 99 E 10915.97 91.360 185.250 3221.49 3332.54 9436.45 S 867.80E 5949909.43 N 550820 ,07 E 11014.28 92.720 183.930 3217.99 3329.04 9534.38 S 859.94E 5949811.45 N 550812 .86 E 11113.71 88.750 179.240 3216.71 3327.76 9633.71 S 857.19E 5949712.10 N 550810. 77 E 11212.63 88.700 178.230 3218.91 .3329.96 9732.58 S 859.37E 5949613.25 N 550813. 61 E 11309.00 89.570 176.480 3220.37 3331.42 9828.84 S 863.82E 5949517.03 N 550818 .70 E 11406.05 88.700 175.260 3221.83 3332.88 9925.62 S 870.81E 5949420.29 N 550826 .33 E 11505.35 90.810 175.590 3222.26 3333.31 10024.60 S 878.73E 5949321.37 N 550834 .90 E 11603.13 90.930 178.280 3220.77 3331.82 10122.22 5 883.96E 5949223.78 N 550840 .78 E 11703.47 89.060 177.970 3220.78 3331.83 10222.50 S 887.24E 5949123.53 N 550844 .73 E 11803.01 92.230 179.730 3219.66 3330.71 10322.00 S 889.24E 5949024.05 N 550847 .39 E 11904.04 91.100 179.630 3216.72 3327.77 10422.98 S 889.80E 5948923.07 N 550848 .62 E 12002.38 90.990 180.060 3214.93 3325.98 10521.30 S 890.07E 5948824.75 N 550849 .54 E 12100.89 91.610 180.620 3212.70 3323.75 10619.79 S 889.48E 5948726.26 N 550849 .61 E 12199.29 91.230 180.270 3210.26 3321.31 10718.15 S 888.72E 5948627.89 N 550849 .50 E 12298.13 89.810 179.970 3209.36 3320.41 10816.98 S 888.51E 5948529.06 N 550849 .95 E 12396.84 89.750 180.740 3209.74 3320.79 10915.69 S 887.90E 5948430.35 N 550849 .99 E 12495.55 93.290 183.120 3207.12 3318.17 11014.29 S 884.58E 5948331.74 N 550847 .33 E 12593.02 92.710 180.330 3202.02 3313.07 11111.57 S 881.65E 5948234.44 N 550845 .04 E 12692.29 89.990 177.820 3199.68 3310.73 11210.78 S 883.25E 5948135.24 N 550847 .30 E 12790.84 90.740 178.300 3199.05 3310.10 11309.27 S 886.59E 5948036.77 N 550851 .29 E 12889.79 89.810 178.340 3198.58 3309.63 11408.18 S 889.49E 5947937.89 N 550854 .85 E 12989.11 90.500 178.910 3198.31 3309.36 11507.47 S 891.87E 5947838.62 N 550857 .89 E 13088.48 92.160 180.600 3196.00 3307.05 11606.80 S 892.30E 5947739.29 N 550858 .98 E ConocoPhillips Dogleg Vertical Rate Section (°/100ft) 8300.37 Tie-On Point 7.953 8400.99 3.192 8496.45 5.229 8547.31 1.537 8642.95 3.847 8742.11 0.579 8842.89 1.349 8942.01 1.131 9040.55 3.242 9140.14 2.659 9239.93 1.409 9338.26 0.544 9436,45 1.927 9534.38 6.179 9633.71 1.022 9732.58 2.028 9828.84 1.544 9925.62 2.151 10024.60 2.753 10122.22 1.889 10222.50 3.642 10322.00 1.123 10422.98 0.451 10521.30 0.848 10619.79 0.525 10718.15 1.468 10816.98 0.782 10915.69 4.321 11014.29 2.920 11111.57 Comment 3.728 11210.78 0.904 11309.27 0.941 11408.18 0.901 11507.47 2.384 11606.80 • • 26 September, 2005 - 10:34 Page 2 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for Kuparuk 1E - 1E-170L1 Your Ref:500292326460 Job No. AK-ZZ-0003778283, Surveyed: 21 August, 2005 ConocoPhillips Western North Slope Measured True Sub-Sea Vertical Local Coordinates Global Coo rdinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 13186.48 90.670 180.860 3193.58 3304.63 11704.76 S 891.05E 5947641.32 N 550858.38E 1.543 11704.76 13285.39 91.300 181.640 3191.88 3302.93 11803.63 S 888.89E 5947542.44 N 550856.88E 1.014 11803.63 13384.05 92.160 180.080 3188.90 3299.95 11902.23 S 887.41E 5947443.83 N 550856.05E 1.805 11902.23 13480.03 91.670 180.690 3185.70 3296.75 11998.16 S 886.77E 5947347.90 N 550856.05E 0.815 11998.16 13579.80 91.230 182.360 3183.17 3294.22 12097.86 S 884.11E 5947248.19 N 550854.05E 1.730 12097.86 • 13679.87 92.840 181.690 3179.62 3290.67 12197.80 S 880.58E 5947148.23 N 550851.18E 1.742 12197.80 13778.67 93.580 182.850 3174.09 3285.14 12296.36 S 876.67E 5947049.64 N 550847.93E 1.391 12296.36 13879.29 90.790 181.020 3170.25 3281.30 12396.84 S 873.28E 5946949.14 N 550845.21E 3.315 12396.84 13973.54 91.300 181.840 3168.53 3279.58 12491.04 S 870.93E 5946854.93 N 550843.48E 1.024 12491.04 14068.39 92.100 180.880 3165.72 3276.77 12585.82 S 868.68E 5946760.13 N 550841.86E 1.317 12585.82 14163.46 91.420 178.870 3162.80 3273.85 12680.84 S 868.89E 5946665.12 N 550842.70E 2.231 12680.84 14258.71 91.540 178.580 3160.34 3271.39 12776.03 S 871.00E 5946569.94 N 550845.45E 0.329 12776.03 14354.73 91.920 176.830 3157.44 3268.49 12871.93 S 874.85E 5946474.07 N 550849.93E 1.864 12871.93 14449.57 89.990 177.890 3155.86 3266.91 12966.65 S 879.21E 5946379.38 N 550854.92E 2.322 12966.65 14544.80 91.490 180.470 3154.63 3265.68 13061.85 S 880.58E 5946284.19 N 550856.92E 3.134 13061.85 14639.20 91.420 180.950 3152.23 3263.28 13156.21 S 879.41E 5946189.82 N 550856.37E 0.514 13156.21 14735.81 92.720 182.130 3148.74 3259.79 13252.72 S 876.81E 5946093.30 N 550854.42E 1.817 13252.72 14830.19 91.410 182.440 3145.34 3256.39 13346.96 S 873.05E 5945999.04 N 550851.29E 1.426 13346.96 14924.92 91.420 182.650 3143.00 3254.05 13441.57 S 868.85E 5945904.40 N 550847.71E 0.222 13441.57 15018.59 90.610 180.910 3141.34 3252.39 13535.18 S 865.94E 5945810.78 N 550845.42E 2.049 13535.18 01 15114 89 690 180.070 3141.09 3252.14 13630.59 S 865.12E 5945715.36 N 550845.24E 1.306 13630.59 . 15203.82 . 89.940 179.860 3141.38 3252.43 13720.40 S 865.18E 5945625.56 N 550845.89E 0.364 13720.40 15301.14 91.120 181.750 3140.48 3251.53 13817.70 S 863.81E 5945528.25 N 550845.17E 2.289 13817.70 15391.93 90.430 183.590 3139.25 3250.30 13908.38 S 859.58E 5945437.54 N 550841.54E 2.164 13908.38 15487.71 92.540 184.310 3136.77 3247.82 14003.89 S 852.99E 5945341.99 N 550835.58E 2.328 14003.89 07 15580 91.660 182.350 3133.39 3244.44 14096.03 S 847.63E 5945249.82 N 550830.83E 2.325 14096.03 . 15672.61 94.330 181.930 3128.55 3239.60 14188.37 S 844.18E 5945157.46 N 550828.00E 2.921 14188.37 20 15724 93.450 181.890 3125.05 3236.10 14239.81 S 842.46E 5945106.00 N 550826.62E 1.708 14239.81 . - 15756.00 93.450 181.890 3123.14 3234.19 ~ 14271.54 S 841.41E 5945074.27 N 550825.79E 0.000 14271.54 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section Is from Well and calculated along an Azimuth of 180.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15756.OOft., 26 September, 2005 - 10:34 Page 3 of 4 DrIIlQuest 3.03.06.008 Western North Slope The Bottom Hole Displacement is 14296.32ft., in the Direction of 176.626° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 9777.64 3331.44 8300.37 S 870.32E Tie-On Point 15756.00 3234.19 14271.54 S 841.41E Projected Survey Halliburton Sperry-Sun Survey Report for Kuparuk 1E - 1E-170L1 Your Ref: 500292326460 Job No. AK-ZZ-0003778283, Surveyed; 21 August, 2005 ConocoPhiUips • Survey tool program for 1E-170L1 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 826.00 815.65 To Measured Vertical Depth Depth (ft) (ft) 826.00 815.65 15756.00 3234.19 Survey Tool Description CB-SS-Gyro (1E-170PB1) MWD+IIFR+MS+SAG (1E-170PB1) r: Z6 September, 2005 - 10:34 Page 4 of 4 DrillQuest 3.03.06.008 ..........~..ru.,..~ .~, ~ ,., ..,..,~ Uu.....,u,..,.,. ..,.~.,.s ...,~.u., ~~,.,...... • Subject: RE: FW: Kuparuk 1E-170West Sak Producer - Gasing Repair (Sundries 305-283; 305-28~; and 305-285) From: "Mukavtz,SteveJ" <Steve..t.Mukavitz@conoeophllips.com> Date: Mon,' 07 Nov 2005 14:31:36 -0400 To: Thor~~as ~~iauncie.r <~ton1 maunder(c'admin.state.ak.us-% We"re hypothesizing that the bottom leak is due to over-torqueing the 9-518" liner in the liner hanger area while running the string and rotating to get it in the hole. The upper leak is in a 4-5' interval with 25-35% wail loss in the casing, probably associated with casing wear. We're still looking at trying to determine what or when the wear may have occurred. It was isolated to just this one spat. Regards, Steve Mukavitz ConocoPhillips Alaska, Inc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 ~~s-~~~` ~~ _o~~ -----Original Message----- From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Monday, November 07, 2005 9:30 AM To: Mukavitz, Steve J Subject: Re: FW: Kuparuk 1E-170 West Sak Producer -Casing Repair (Sundries 305-283, 305-284, and 305-285} Good news. Any determination as to the cause of the leaks?? Tom Maunder, PE AOGCC Mukavitz, Steve J wrote, On 11/7/2005 9:21 AM: Tom, Update on 1 E-170 for your info. We squeezed the upper leak from 4752' - 4757' MD and tested to 2500 psi last week. We then ran the Baker expandable casing patch over the weekend and successfully patched the lower leak from 4856' - 4861' MD. We then tested the entire 9-518" string to 2500 psi and it held great. We're currently preparing to run the 4-112'" completion. Let me know if you have questions. Regards, Steve Mukavitz ConocoPhillips Alaska, Inc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 1 of 3 11/7/2005 2:49 PM ... .,ul,... .... , a~ . , v .. wa vua~ a . vuu....i - ~.~ iwYuu ~~wiul aw... Subject: FW: Kupan~k 1E-170 West Sak Producer -Casing Repair (Sundries 305-283; 305-284, and 305-285) From: "Mukavitz, Steve.I" <Steve.J.Mukavit~@conocopnillips.com> Bate:. Mon, 0? Nov 2005 09:21:29 -~90C} ~~~~ ~- To: Thomas Maunder <tom mazirtcler,~i;admin.state.ak.us> CC;: "Gober, Ho«arel" ~_Hc~u~ard.Gober~l)cor~oeophillips.ca~n-~ ~` V~ ~ ~-- Tom, ~~ Update on 1 E-170 for your info. We squeezed the upper leak from 4752' - 4757' MD and tested to 2500 psi last week. We then ran the Baker expandable casing patch over the weekend and successfully patched the lower leak from 4856' - 4861' MD. We then tested the entire 9-5/8"' string to 2500 psi and it held great. We're currently preparing to run the 4-112" completion. Let me know if you have questions. Regards, Steve Mukavitz ConocoPhillips Alaska, Inc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 -----Original Message----- From: Mukavitz, Steve J Sent: Thursday, October 20, 2005 8:32 AM To: 'tom_maunder@admin.state.ak.us' Subject: FW: Kuparuk 1E-170 West Sak Producer -Casing Repair (Sundries 305-283, 305-284, and 305-285) Tom, We rigged up on 1 E-170 in Kuparuk {tri-lateral West Sak producer} aver the weekend and are proceeding with our diagnostics and repair of the 9-5I8" production casing. 1=urther testing on Tuesday indicates a second leak in the 9-518" casing, 100' above the first. We have a 30` Baker expandable casing patch on iacation, but this obviously won't cover both leaks. Lead time on additional patch cladding to extend the patch is 8 weeks. I talked to Winton yesterday about squeezing the upper leak and attempting to get a pressure test prior to running the patch over the lower leak. The upper leak is in the 9-518" tie-back string (we ran the 9-5/8" tieback after the 9-5/8" liner was set, and the upper leak is above the 13-3/8" x 9-5{8" packer at the bottom of the tieback string}. We'U essentially be circulating cement into the annulus (plan is 1000' of cement}. We'ii pressure test to 2504 psi when finished with the cement and patch. Winton indicated to continue under our current Sundry Approvals for the well. Please call if you have questions or need more information. Regards, Steve Mukavitz I of 2 l l 17/2005 11:08 AM ConocoPhillips Alaska, Inc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 -----Origina4 Message----- From: Nabors 3S Company M Sent: Wednesday, October 19, 2005 7:58 AM To: Mukavitz, Steve J Subject: Leaks Steve After back strapping out of hole with kill string leak depths where determined to be (bottom leak 4861'-4856' RKB top leak 4757'-4752' RKB} overall length of 109' of bad pipe. Just wanted to make sure you had the right depths and length for patch design. I put an update in Dims Nabors 3S Rig Supervisor (907) 659-7639 Office (907) 659-7295 Fax 2 of 2 11!7/2005 11:08 AM • Subject: RE: FW; Kuparuk 1E-170 .West Sak Producer -Casing Repair (Sundries 305-283, 305-284, and 305-285) From: "Mukavitz,. Steve J" <Steve.J.Mukavitz@conocophillips.eom> Date: Thu, 20 Oct 2005:11:3.1:09 -08OU ~'a:~Thoznas Maunder<toni ~aunder~admin.state.ak.us? ~~5-~~~ Tom, -~~ ~' Sorry for the late reply. Been chasing things all morning. ,~~~ The 13-318'" x 9-518" annulus is full of diesel right now.... we're actually pumping some additional diesel down the backside as we speak to ensure it's full after doing some injection testing this morning. We're going to pump our normal Arctic Set 1 cement we use far surface casing since we're so shallow (2000 - 2300' TVD) and ensure we spot cement across the leaks prior to circulating cement to minimize any brine in the annulus (we have 9.6 in there now). We've been working on a plan where we actually squeeze the upper and lower leaks together.., figure it can't hurt to get cement in the bottom leak as well and this will save us a drill out of a plug. This will also help get cement across the upper leak before opening up the backside and taking returns to bring the cement into the annulus. The upper leak takes fluid much easier than the lower as expected (the tower's already been squeezed a couple times as you probably recall) which is fine since it's our primary focus. Regards, Steve Mukavitz ConocoPhiHips Alaska, lnc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 -----Original Message----- From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Thursday, October 20, 2005 8:42 AM To: Mukavitz, Steve J Subject: Re: FW: Kuparuk 1E-170 West Sak Producer -Casing Repair (Sundries 305-283, 305-284, and 305-285) Steve, Your plan does sound appropriate, unfortunately. Will placing the cement give any problems with freeze protection?? Tom Maunder, PE AOGCC Mukavitz, Steve J wrote, On 10/20/2005 8:31 AM: Tom, We rigged up on 1 E-170 in Kuparuk (tri-lateral West Sak producer} over the weekend and are proceeding with our diagnostics and repair of the 9-5I8° production casing. Further testing on Tuesday indica#es a second leak in the 9-5/8°' casing, 100' above the first. We have a 30' Baker expandable casing patch on location, but this obviously won't cover both leaks. bead 1 of 2 11/7/2005 11:09 AM ..~,. ~ ....~..1.,..,....~. . , ., .. .,.,..........~.~u.,~u~~ias .~.,ruu ~vuuu... tirrie on additional patch cladding to extend the patch is 8 weeks. 4 talked to Winton yesterday about squeezing the upper leak and attempting to get a pressure test prior to running the patch over the Power leak. The upper leak is in the 9-5/8" tie-back string {we ran the 9-5l8° tieback after the 9-5I8" liner was set, and the upper leak is above the 13-3/8" x 9-5/8" packer at the bottom of the tieback string). We'll essentially be circulating cement into the annulus {plan is 1000' of cement). We'1( pressure test to 2500 psi when finished with the cement and patch. Winton indicated to continue under our current Sundry Approvals for the well. Please call if you have questions or need more information. Regards, Steve Mukavitz ConocoPhilfips Alaska, Inc. 700 G Street, ATO 1548 Anchorage, AK 99501 907-263-4021 -----Original Message----- From: Nabors 3S Company M Sent: Wednesday, October 19, 2005 7:58 AM To: Mukavitz, Steve J Subject: Leaks Steve After back strapping out of hole with kill string leak depths where determined to be (bottom leak 4861'-4856' RKB top leak 4757'-4752' RKB) overall length of 109' of bad pipe. Just wanted to make sure you had the right depths and length for patch design. I put an update in Dims Nabors 3S Rig Supervisor (907) 659-7639 Office (907) 659-7295 Fax 2 of 2 11/7/2005 11:09 AM • AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well 1 E-170 L1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 9,777.64' MD r~ u ri~. ~.~ ~~ :~ 05`'-Oct-d5 ~......~ t~~-W~ ~F~~~` Window /Kickoff Survey: 0.00' MD (if applicable) Projected Survey: 15,756.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ~/ /~ ,,, ` ,~ Date~~ ~~~ ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) • •. "•i _, Q5-Oct-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 1 E-170 L1 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 9,777.64' MD Window /Kickoff Survey: 0.00' MD (if applicable) Projected Survey: 15,756.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. ~~ A ~ ~ ~ / Anchorage, AK 99518 /f Date ~ ~ ~~ ~ Signed ~ ~U~~~~"2Y Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) • • ~ :~ ,~~, ~ ~ 4 y ~~ 1 ~{ u.aq ~~ ~ J~ t 1 ~ I ( ~ ' r~ ~ s ' ',Ja t ~ ~ i i ,~°`` ~~ q FRANK H, MURKOWSKI, GOVERNOR ~~ ~~ ~~ ~~rr *_ ~ ta~tr~ /-~ ~ ~+ L~i1[1r7~ O~ ~ ~ ;~~i 333 W. 7r" AVENUE, SUITE 100 COI~TSERVATIOrIT COI~IMIS5IOIQ ANCHORAGE,AIASKA99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Randy Thomas GKA Drilling Team Leader ConocoPhillips Alaska, Tnc. P.O. Box 100360 Anchorage, AK 99510 Re: 1 E-170L 1 Sundry Number: 305-284 Dear Mr. Thomas: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this~N day of September, 2005 Encl. • ConocoPhillips September 23, 2005 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 • Randy Thomas GKA Drilling Team Leader Drilling & Wells P. O. Box 100360 Anchorage, AK 99510-0360. Phone: 907-265-6830 ~~~~~~~~ CEP 2 ~ 2a05 Alaska pil & Gas Cans. Camt'nisaion Anchorage Subject: Application for Sundry Approval for 1 E-170, 1 E-170L1, 1 E-170L2 Dear Commissioner: ConocoPhillips Alaska, Inc. submits the attached Application for Sundry Approval for the Kuparuk multilateral 1 E-170, 1 E-170L1 and 1 E-170L2. We are planning to re- enterthis well, do a workover and run tubing according to the attached procedure. The Nabors 3S rig is scheduled to perform this work. If you have any questions regarding this matter, please contact me at 265-6830. Sincerely, ~~~ ~ _. R. Thomas GKA Drilling Team Leader CPAI Drilling and Wells RT/skad STATE OF ALASKA ~~G ALASKA OIL AND GAS CONSERVATION COMMISSION ~~P ~ ~ ~Q~~ ~ 1 APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 .. _~.., na & G#S COn~• Corxx'~~e~o~i 1. Type of Request: Abandon ^ Suspend ^ Operational Shutdown ^ Perforate ^ Waivt~{~GhQa~ Other ^ Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension ^ Change approved program ^ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well Q 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, InC. Development Q Exploratory ^ 205-075 / 305-272 3. Address: Stratigraphic ^ Service ^ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-23264-60 7. KB Elevation (ft): 9. Well Name and Number: RKB 41' 1 E-170L1 8. Property Designation: 10. Field/Pool(s): ADL 25660, ALK 470 Kuparuk River Field /West Sak Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 15756' 3231' Casing Length Size MD ND Burst Collapse Conductor g0' 20" x 34" 120' 120' Surtace 5011' 13-3/8" 5054' 2311' Intermediate 10371' 9-5/8" 10414' 3451' Iner 5795' 5.5" 15745' 3235 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): none none none Packers and SSSV Type: Packers and SSSV MD (ft) none no SSSV no SSSV 12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development ~ Service ^ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: October 3, 2005 Oil ~ Gas ^ Plugged ^ Abandoned ^ 16. Verbal Approval: WAG ^ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Steve Mukavitz @ 263-4021 Printed Name Randv Thomas Title: GKA Drilling Team Leader Signature ~ - ,__ Phone orb $3J Date `1 ~z6/oS Commission Use Onl Sundry Number: J Conditions of approval: Notify Co m mission so that a representative may witness - ~ 4 ~ [ Plug Integrity ^ BOP Test ~~ Mechanical Integrity Test ^ Location Clearance ^ Other: ~~® ~ ~~~.~a~ vZ~~~ ~:5~"` 1 S QF~. ~~P ~ 9 2DD5 Subseque or eq ed: APPROVED BY D Appro COMMISSIONER THE COMMISSION Date: Form 10-403 Revised 712005 ~ ~ ~ Sub tin Duplicate • i Rig Workover Procedure Well 1E-170 West Sak Producer The objectives of the rig workover are as follows: ^ Re-locate and confirm the presence of a single leak in the 9-5/8" casing from approximately 4858' - 4860' MD using the 3-1/2" work string and test packer. While setting and testing the "B" lateral LEM and ZXP packer, communication was suspected between the 9-518" casing and 13-3/8" x 9-5/8" annulus. This could be the result of a second leak in the 9-5/8" tieback string above the 13-318" x 9-518" packer, or the result of the 13-3/8" x 9-5/8" tieback string packer leaking and allowing communication from the production casing through the existing leak to the 13-3/8"' x 9-5/8" annulus. ^ Make a casing scraper run with a gauge ring to ensure clean casing across the patch interval. ^ Install a Baker expandable casing patch (approximately 32' long) over the suspected 9- 5/8" casing leak from 4858' - 4860' MD. Test the production casing to 2500 psi. ^ Retrieve the 7" RBP in the "D" lateral LEM • Run the 4-1/2" production tubing and ESP, and nipple up the tree ~ 1 ~ d~ t '~ ~ ~ ' 1 1 ~ ~ fit 1 i 3 $ 9 r .~ ~ n , ~ ~ ~ ~ ~~, i ~ f ~ ~e~''x i 3 ~ ~ a FRANK H. MURKOWSK/, GOVERNOR y)7 T d *~- ~ t~ ~t ~ ~+ ~~ OI~ ~ ~ ~`~ " CO1~T5ERQ~1'1'IO1K COMbIIS5IOI~T 333 W. T AVENUE, SUITE 100 3 ANCHORAGE ALASKA 99501-3539 , ~ PHONE (907) 279-1433 FAX (907) 276-7542 Randy Thomas GKA Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Kuparuk 1 E-170L 1 Sundry Number: 305-272 Dear Mr. Thomas: ~.~~~°~~ Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, /X Y~ i' ~ ' ~ -FiY s F i/ . John I~. Norman (~' Chairman DATED this~~day of September, 2005 Encl. • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~~1~ APPLICATION FOR SUNDRY APPROVAL ~~~~ " ~` 20 AAC 25.280 1. Type of Request: Abandon ^ Suspend ^ Operational Shutdown 0 Perforate ^ Waiver ^ Other ^ Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension ^ Change approved program ^ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development Q Exploratory ^ 205-075 3. Address: Stratigraphic ^ Service ^ 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-029-23264-60 7. KB Elevation (ft): 9. Well Name and Number: RKB 41' 1 E-170L1 8. Property Designation: 10. Field/Pool(s): ADL 25660, ALK 470 Kuparuk River Field /West Sak Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 15756' 3231' Casing Length Size MD TVD Burst Collapse Conductor g0' 20"x34" 120' 120' Surface 5011' 13-3/8" 5054' 2311' Intermediate 10371' 9-518" 10414' 3451' Liner 5795' 5.5" 15745' 3235' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): none none none Packers and SSSV Type: Packers and SSSV MD (ft) none no SSSV no SSSV 12. Attachments: Description Summary of Proposal ~ 13. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development Q Service ^ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: September 9, 2005 Oil Q Gas ^ Plugged ^ Abandoned ^ 16. Verbal Approval: ~p 2005 WAG [] GINJ ^ WINJ ^ WDSPL ^ Commission Representative: /~Y' Tom Maunder 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Steve McKeever @ 265-6826 Printed Name Rand Thomas Title: GKA Drilling Team Leader Signature ` Phone ~~ ~tj~ 3 d Date ~ C ~ ~ l°'~ Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: _ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^ Other: ~..; :9 ~i~i5 SEP ~ ~ ~~~~' Subsequent Form Required: '`~ ~ ~ ~` ~® J ,~~~p~~C~~'~~j ~ cxC~ ~G S~ k~~t Q~~ CZ'C~`~`-'C' t~ ~J~~~t ~'~` ~!C' -~C APPROVED BY `'` Approved by: COMMISSIONER ~ Q THE COMMISSION Date: 1 7'-` Form 10-403 Revised 712005 Submit in Du licate / Ot\~~~~~~ p 1\G. 11:-1 / V `L1 0.11U LG f JUJ~JG11J1V11 V(./G10.L1U•U 1"1[tll a0 S - O `l'-~ Subject:Re: 1E-170(L1 and L2) Suspension Operations and Plan' ,~~ ~ ~`~ From: Thomas Maunder <tom maunder rz~adminatate.ak.us> „_ ~~ f Date:Fri, 09`Se~ ?005 11:~7:1~ -Ogfl~ k~ To: "McKeever. Steve" <Sti;ve.blcKeever~conocophillips.com> CC: "'Greener, ?~-~1il:c R." <I~lihe.R.Greener ci~cot~ocophillips.com>, "hlukavitz, Steve J" Steve.J.Mukavitr~l;.conocophillips.com=>, "_Al Isup-Drake, Sharon K" <Sharon.K.Allsup-I)rakc_:"u;conocophillips.com~, Lo~z Grimaldi ~lou_~~'im~~dit~~c~zninatatc~.ak_us> Steve, et al: Thanks for the information. As we discussed this morning, I was able to find some prior messages regarding the leak at/near the liner hanger and the remaining work of drilling and equipping the laterals was conducted according to the plans transmitted in those messages. At this point, it is probably appropriate to designate this as an "operational SD" and a sundry is necessary. My reasoning is that the rig will be changed and there is a some amount of new work that will be planned for 3 S to accomplish. Starting the 3 S work will also require submitting a sundry to transmit the work plan. Based on the information you have provided, you may continue with the work to secure the well and move off the rig. I will look forward to receiving the sundries. Sharon, just send in theforms. I will attach this message as back up. Tom Maunder, PE ~p-3 AOGCC McKeever, Steve wrote, On 9/9/2005 10:50 AM: Tom- As we discussed this morning, we are in the process of suspension operations on our well 1E-170, in anticipation of moving off Doyon 15 and completing the work with Nabors 35 later this month.. I have attached a summary of our recent Doyon 15 operations on this well. Summarizing those operations, we successfully ran a liner into the upper lateral and ran the LEM assembly into the upper hook hanger. This LEM assembly had a joint of 7" casing just below the ZXP packer, allowing us to set and test a retrievable bridge plug in that joint of 7", providing full hydraulic isolation from all three laterals. Following the test of the bridge plug with a retrievable test packer, the wellbore above the plug was displaced to 9.6 ppg NuCI brine, and the 3-1/2" work string and test packer were hung off from the tubing hanger. Currently we are preparing to nipple down the BOP, nipple up and test the tree, and move off the well. Nabors 3s will move onto the well later this month. Once they have nippled up and tested their BOP stack the plan is to: • Re-locate and confirm the presence of a single leak in the 9-5/8" casing from approximately 4858' - 4860' MD (x-over below the 9-5/8" liner hanger) using the 3-1/2" work string and test packer currently hung off in the well as a kill string. 1 of 2 9/9/2005 1:55 PM xe: i~-i iu li-i anu L~~ suspension vpera~iv~a rian • • Install a Baker expandable casing patch over the 9-5/8" casing leak from '' 4858' - 4860' MD. Test the production casing to 2500 psi. • Retrieve 7" retrievable bridge plug in "D" sand Lateral Entry Module. • Run the 4-1/2" production tubing and ESP completion and nipple up the tree. Please let me know if you approve this plan of operations, and if any further paper work in required. Thanks kindly. «1E-170 Suspension Operations.pdf» Steve McKeever Senior Drilling Engineer ConocoPhillips Alaska, Inc. 700 "G" Street Anchorage, Alaska 99501 steve.mckeeverC~conocophi I Ips.com office: 907/265-6826 fax: 907/265-1535 pager: 907/275-0369 "The short fortune-teller who escaped from prison was a small medium at large." 2 of 2 9/9/2005 1:55 PM • ~- _ - _ - - -- ConocoPhillips Alaska Operations Summary Report i Legal Well Name: 1 E-170 Common Well Name: 1 E-174 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date From - To 9/5/2005 9/6!2005 3/7/2005 21:30 - 00:00 00:00 - 02:00 ~ 02:00 - 02:15 r 02:15 - 02:30 02:30 - 03:30 :03:30 - 04:30 ~ 104:30 - 04:45 104:45 - 06:00 06:00 - 06:45 06:45 - 07:00 07:00 - 07:15 07:15 - 12:45 Hours 2.5( 2.0( 0.2; 0.2( 1.0( 1.0( 0.2; 1.2° Code Sub Code CMPLTN TRIP CMPLTNITRIP CMPLTIJ~ SFTY CMPLTNIOTHR CMPLTN PULD CMPLTN PULD CMPLTN SFTY CMPLTN PULD 0.75' CMPL 0.25 CMPL 0.25 CMPL 5.501 CMPL Start: 6/21 /2005 Rig Release: Rig Number: 15 --- Page 42 of 44' Spud Date: 6/26/2005 End: Group: Phase Description of Operations CMPLT3 ~ POOH wJ hook hanger running tools f/ 9260' to 4493'. CMPLT3 I POOH w/ hook hanger running tools f/ 4493' to BHA inner string CMPLT3 ' PJSM on UD inner string 2 7!8" CMPLT3 Clean rig floor. CMPLT3 UD 2 7/8" inner string. ,CMPLT3 ~ Clear floor of tools. PU tools to PU 4 1/2" LEM. CMPLT3 `' PJSM on running 4 1/2" LEM f/ "D" lateral. CMPLT3 I PU/MU 4 1/2" LEM consisting of :Baker seal assembly, (1) jt 4 1/2" 12.6 i ppg L-80 IBT x STL, (7) jts 4 1/2" 12.6ppf L-80 IBTM tubing, 4 1 /2" pup 1t, LEM, (3) 4 1/2" pup jts, 4 1/2" casing swivel, crossover bushing 5 1/2 i 563 x 4 1/2" IBT, 190-47 casing seal bore, crossover 7" x 5 1/2" 563, (1) jt 7" 26 ppf, L80 Hydril 563 casing PULD ~ CMPLT3 ;Make up 2 7/8" inner string to 9 5/8" x 7" ZXP liner top packer. PULD 'CMPLT3 I Make up 9 5/8" x7" ZXP liner top packer, Check screws. OK. OTHR CMPLT3 !Clean rig floor, remove csg tools. TRIP j CMPLT3 ~ RIH on 5" dp : 4 1/2" LEM consisting of :Baker seal assembly, (1} jt 4 1/2" 12.6 ppg L-80 IBT x STL, (7) jts 4 1!2" 12.6ppf L-80 IBTM tubing, 4 I ~ 1/2" pup jt, LEM, (3) 4 1/2" pup jts, 4 1/2" casing swivel, crossover ~ bushing 5 1/2 563 x 4 1/2" IBT, 190-47 casing seal bore, crossover 7" x 5 1/2" 563, (1) jt 7" 26 ppf, L80 Hydril 563 casing, Baker 9 5/8" x 7" ZXP ~ ~, liner top packer = 430.62' then Baker setting tool and 5' dp pup jt. Total of 441.59'. RIH 5 stands 5" slick (476.27, 74 stands 5" dp w/ to-tads (7316.41'), 12 j stands 5" HWDP(1105.62') w/ 21.1' up. PU wt 230k, SO wt 120k. ~ CMPLT3 'Slack off watching top of "D" lateral @ 9412.28' (did not see anything), l Continue running stands of HWDP f/derrick. Run stand 92, 93,94,95, and 96. PU wt 245k, SO wt 125k. CMPLT3 ~ Continue RIH w! stand 96 (17th stand of HWDP). Did not see crossover ' in "B" lateral @ 21' in (9728'), continue slack off to latch @ 3T in on stand 96 (9739' mule shoe depth) (9412,28' top of LEM in hook hanger of "D" lateral). Top of Casing seal receptacle in "B" lat LEM a 9729.91', bottom of casing seal receptacle @ 9749.31'. PU to 265k to verify latch. CMPLT3 ~ Drop 1 3/4" ball, pump down @ 5bpm w/ 500 psi f/ 100 bbls, slow to 3 bpm 300 psi, ball seated @ 120 bbls pumped. i CMPLT3 ~ Pressure up to 3080 psi, set Baker ZXP packer @ 9308.62', presure to 14000 psi to release. CMPLT3 j PU, PU wt 240K-245K (verified release). PU 20' f/ 9308' to 9288'. Slack ~ off 40k down w/ dogs to meth set packer as well. PU 20' rotate down w/ 40k on liner top pkr twice. CMPLT3 I Monitor well, POOH w/ running tools f/ LEM f/ 9308' to 8135'. PU wt ;245k, SO wt 120k. Attempt to break out 1st stand LoTad. High torque 30k. Broke 1st Lo Tad w/ rig tongs w/ 30K. CMPLT3 ~ Repair/ replace top cylinder of iron roughneck breakout. ,CMPLT3 POOH f! 8135 to 7938'. Check out Iron roughneck by making breaks on stand 78, OK. Break & UD LoTad f/ stand 78. Pull stand 79, break and lay down LoTad f/ stand simulating laying down dp f/derrick and removing LoTads. OK. 12:45 -13:00 ' 0.25! CMPLTNi TRIP 13:00 - 13:15 0.25 !13:15-13:45 i 0.50 13:45 - 14:00 i 0.25 1;14:00-14:151 0.25 14:15 - 16:00 i 1.75 16:00 - 22:00 ' 6.00 22:00 - 22:30 0.50 22:30 - 00:00 ! 1.50 00:00 - 03:00 3.00 ~ 03:00 - 03:15 03:15 04 00 0.25 ! 0 75 - : i . 04:00 - 05:00 1.00' 05:00 - 05:15 j 0.251 CMPLTNi OTHR CMPLTN CIRC CMPLTN PCKR CMPLTNI OTHR f CMPLTN TRIP RIGMNT RGRP CMPLTNi TRIP CMPL CMPL CMPL CMPL CMPL' CMPL TRIP CMPLT3 ,Continue POOH f/ 7938' to 5964'. 51 stands Lotads in hole @ midnight TRIP I CMPLT3 Continue POOH f/ 5964' to 80' 51 stands Lotads in hole. SFTY i CMPLT3 ~ PJSM on UD LEM tools. PULD CMPLT3 I UD LEM running tools. OTHR CMPLT3 Pull VetcolGray wear bushing, clear rig floor. SFTY ~ CMPLT3 ~ PJSM on PU 7" Baker Model WG Bridge plug and Baker Heavy duty Printed: 9/9/2005 10:19:09 AM .7 • ConocoPhilfips Alaska Operafiions Summary. Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Contractor Name: D15CM@conocophillips.com Rig Name: Doyon 15 Date ' t-rom - To Hours I Code ~ Sub f `phase Gode 9/7/2005 ' 05:00 - 05:15 ~ 0.25 ~ CMPLTN SFTY ~ CMPLT3 05:15 - 06:00 ~ 0.751 CMPLTN PULD i CMPLT3 I ~ ~ ~~ 06:00 - 08:45 :1 2.751 CMPLTNI PULD ~ CMPLT3 i ~ ~ i i 08:45 -13:45 5.00 i RIGMNT RGRP CMPLT3 13:45 - 14:45 ~ 1.00 ~ RIGMNT~ RSRV ~ CMPLT3 14:45 - 15:15 I 0.50 ~ CMPLTNI PULD CMPLT3 I i 15:15 -18:00 ~ 18:00 - 19:45 I 2.75 ~ CMPLTNI PULD I CMPLT3 I 1.751 CMPLTNI PULD CMPLT3 { I j19:45-20:00 20:00 - 20:30 20:30 - 21:00 121:00 - 23:00 23:00 - 23:15 I ',23:15-00:00 9/8/2005 100:00 - 00:30 00:30 - 02:00 02:00 - 02:30 I 02:30 - 03:00 ~, 0.25 0.50 CMPLTNI OTHR !.CMPLT3 CMPLTNI PCKR !CMPLT3 0.5011 CMPLTNI PCKR I CMPLT3 I 2.00 CMPLTN CIRC ~ CMPLT3 0.251 CMPLTNI DEOT i CMPLT3 0.751 CMPLTNI DEOT I CMPLT3 0.50', CMPLTNI DEOT '~, CMPLT3 1.501 CMPLTNI TRIP CMPLT3 0.501 CMPLTNI TRIP !CMPLT3 0.501 CMPLTNI DEOT ;CMPLT3 Start: 6/21!2005 Rig Release: Rig Number: 15 ..Page 43 of 44 ~I Spud Date: 6/26/2005 End: Group: Description of Operations Model "EA" retrievamatic, w/ 3 1/2" IF joint and 3 1/2" XT38 DP. MU 7" Baker Model WG Retievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF I x 3 1/2 XT38, 3 1/2" XT38 DP. One joint made up @ 0600 hrs. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 XT38, on 71 joints 3 1/2" 13.3ppf XT38. Rabbit dp to 2 5/16". Torque 3 1/2" IF conn to 10k, XT38 Conn to 16.5k ft/Ib. ~ Trouble shoot and repair of pipe handling machine. Selonoid valve and spool. Slip & cut 136' drilling line. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, ~ crossover 3 1/2" IF x 3 1/Z XT38, on 71 joints 3 1/2" 13.3ppf XT38, then start w/ 3 1/2" 15.5 ppf XT38, 44 jts of 15.5 ppf in hole now. Total of 115 ,its XT in hole. I Rabbit dp to 2 5/16". Torque XT38 conn to 16.5k ft/Ib. Continue RIH w/ 7" Baker Model WG Retrievable Bridge plug, (1) jt 3 1/2" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 XT38, on 71 joints 3 1/2" 13.3ppf XT38, then start w/ 3 1/2" 15.5 ppf XT38, 167 jts of 15.5 ppf in hole now. Total of ~ 238 jts XT in hole. Continue RIH w/ 7" Baker Model WG Retievable Bridge plug, (1) jt 3 I' 112" 13.3 dp 3 1/2" IF, Baker Heavy duty Model "EA" retrievamatic, crossover 3 1/2" IF x 3 1/2 XT38, on 71 joints 3 1/2" 13.3ppf XT38, then 'start w/ 3 1/2" 15.5 ppf XT38, 167 jts of 15.5 ppf in hole now. Total of 295 jts XT Picked up. Tag 9.04' in on jt # 295. PU wt 165k, SO wt 75k. MU crossover on jt 295, MU top drive and tag top of {finer @ 9308' (9.04' in on jt 295), bottom of bridge plug @ 9354.94'. PU, Break off single and drop 1-1/2" ball. MU single, SO tag liner top, PU 6' above tag, circ ball to seat @ 3bpm w/ 700 psi. Pressure up @ 50 bbls pumped. Pressure to 2300 psi. Pick up to 180k, shear oft of bridge plug. Bridge plug top @ 9346.24', bottom 9348.94". Length of bridge plug 2.70' UD 2 jts, PU jt w/ x-o, MU top drive.Jt # 293 in hole white testing, jt 294 above rig floor. 9308' bottom of tool Circulate bottoms up @ 5bpm w/ 1880 psi. Circ 600 bbls. RU to test Baker 7" Model WG Retrievable bridge plug set @ 9346.24' , ZXP liner top packer @ 9308' w! test pkr @ 9259'. Rotate 5 turns to set packer. Set down 5k. Attempt to test Retrievable bridge plug. No test. PKR depth 9259'. Not enough weight to set test pkr. Circulating to surface. Attempt to test Retrievable bridge plug &ZXP packer. No test. PKR depth 9259'. Not enough weight to set test pkr. Only 5k above block weight. Circulating to surface. POOH Ud 5 jts of 3 1/2" 15.5 ppf XT38 dp. Stand back 11 stands in derrick to 8211' Trip in hole w/ 11 stands 5" HWDP f/ 8211' to 9090'. 10 stands HW in hole. PU wt 190k. SO wt 105k. RIH f/ 9090' to 9163' (element center @ 9114'). Apply 5 rounds RH w/ 8k torque. Set test packer w/ 35k down wt to 70k block wt. Attempt to test, no test, PU to 9114', set 35k down wt. Printed: 9/9/2005 10:19:09 AM • • ConocoPhiilips,Alaska Operations Summary Report Legal Well Name: 1 E-170 Common Well Name: 1 E-170 Event Name: ROT -DRILLING Start: Contractor Name: D15CM@conocophillips.com Rig Release: Rig Name: Doyon 15 Rig Number: 6/21/2005 Page 44 of 44 Spud Date: 6/26/2005 End: Group: 15 Sub Date From - To Hours i Code LCod j Phase ~ Desa-jption of Operatjons 9/8/2005 ~ 03:00 - 03:45 03:45 - 04:00 04:00 - 04:30 04:30 - 05:15 05:15 - 07:30 07:30 - 08:00 08:00 -10:00 10:00 -13:00 13:00 - 13:30 13:30 - 14:15 14:15 - 14:30 14:30 - 15:00 15:00 - 15:15 15:15 - 15:45 15:45 - 16:00 16:00 -16:30 16:30 - 18:00 18:00 - 19:30 19:30 - 21:30 I 21:30 - 00:00 ~ e ~ ~- 0.75 CMPLTNI DEQT 'CMPLT3 ~ Test RBP @ 9346', ZXP liner top packer @ 9308' w/ test packer @ ~ ~ j 9114'. Test to 2540 psi. Chart test. Held 97.3% of test pressure in 30 ~ ~ I min. Pressure lost 68 psi f/ 2540 to 2472 psi. I 0.25' CMPLTNI OTHR CMPLT3 Bleed off pressure, upset packer. 0.50 ~ CMPLTNI TRIP I CMPLT3 I POOH f/ 9114' to 8170' w/ 5" HWDP. " " " 0.75 CMPLTNI TRIP ! CMPLT3 dp, PU 4 jts 3 1/2 dp. Total UD single 3 1/Z DP, TIH 11 stands 3 1/2 I ~ of 293 jts 3 1/2" in hole 2T up.=9308'. 2.25 1 CMPLTNI OTHR ~ CMPLT3 Flush surface lines, cement line, geopilot skid, kill and choke lines and manifold. 0.50 it CMPLTI~ SFTY ~ CMPLT3 ~ PJSM on displacing f/ 9.0 ppg SFOBM to 9.6 ppg Sodium Chloride. 2.00 CMPLTNI CIRC ~ CMPLT3 Displace 9.0 ppg SFOBM to 9.6 ppg Sodium Chloride. Pump @ 6 bpm / 40 i l f 285 t k 632 bbl w ps . Pump a tota s ro s). 15 o 6 es ( 3.00 '' CMPLTNI OTHR j CMPLT3 'Cleaning on rig floor, transfer mud f/ rock washer while wait on brine to ~ ~ be brought over f/mud plant in Prudhoe. 0.50 CMPLT~ SFTY I CMPLT3 I RU truck of 290 bbls 9.6 brine. PJSM w/ crew. Fluid transfer paperwork. 0.75 CMPLT CIRC 'CMPLT3 CMP P j Pump 290 bbls 9.6 ppg Sodium Chloride @ 6 bpm w/ 1540 psi. h " 1 XT 290 l ft i l ~ 0.251 LTN TRI CMPLT3 jts n o e total. POOH 3 jt 3 1/2 5.5 ppf S-135 38 dp. e 0.50; CMPLTNI SOHO ~ CMPLT3 PU/MU Vetco/Gray 13 3/8" x 4 1/2" MB222, 13 1/2" OD hanger w/ ~ I dummy installed as penetrator and two way check installed in hanger. MU to 4 1/2" landing joint w/ 4.909 MCA connection on top of hanger. 0.25 ~ CMPLTNI SOHO CMPLT3 ~ Drain BOP stack to land kill string w/ running tool f/ 7" retrievalble bridge plug on bottom @ 9287.23' 0.50 ~ CMPLTNI DEQT CMPLT3 Run in LDS on Vetco Gray hanger. Test lower body seals to 5000 psi f/ I 10 min. OK. Test upper body seals to 5000 psi f/ 10 min. OK. 0.251 CMPLTNI OTHR `;CMPLT3 i Back out landing joint. UD same. 0.50 i DRILL ! SFTY I CMPLT3 ~ PJSM. Install mouse hole. Rig up to UD 5" dp f/ derrick. Have Total 170 j I ~ stands 5" DP in derrick. 20 stands 5" HWDP, 83 stands w/ LoTads, 67 I' I 1.50 `DRILL I PULD 'CMPLT3 stands slick. Cleaning fluids f/ pits and rock washer. IUD total of 13 stands 5" HWDP. Cleaning fluids f/ pits and rock washer. 1.50 ~ DRILL PULD ~ CMPLT3 2.00 DRILL PULD i CMPLT3 UD total of 7 stands 5" HWDP. Cleaning fluids f/ pits and rockwasher. IUD 5" DP w/ LoTads. Total of 83 to UD. UD 17 stands @ 1930 hrs. ! Cleaning fluids f/ pits and rockwasher. 2.50 ~ RIGMNT RGRP ~ CMPLT3 Pull Hyd cyl f/ pipe spinner on iron roughneck f/ repair. Printed: 9/9!2005 10:19:09 AM nc. ir,-i rv uuciuicuiaw ~,cuicu~ • • Subject: Re: 1E-170 Intermediate Cement From: STMaunder@aol.com ~ S _ ~~ Date: Sat, 23 Ju12005 18:13:12 -0400 (EDT) To: Patrick.J.Reilly@conocophillips.com . ~~ CC: D15CM@conocophillips.com, tom_maunder@admin.state.ak.us ~~~~ Pat and Fred, It appears that you all have clearly identified where the leak is and pumped serveral barrels of cement. The latest test is 690 psi on top of the mud column you have in the hole. When Pat and I talked, it was indicated that the EMW calculated with that pressure and the mud column 14.8 if I remember correctly. That was better than 2 ppg greater than the LOT at the 13-3/8" shoe and (assuming 9.0 ppg mud) better than 5 ppg greater than the MW. It is not likely that further applications of cement will improve the pressure tollerance. The plan to ultimately set a patch across the leak is a sound one. You are proposing to continue drilling the laterals as planned and then install the patch when the laterals are complete. Since your 12-1/4" hole penetrated all the sands of the West Sak without experiencing any pressure problems, there is little risk that drilling the laterals will result in encountering higher pressures than previously experienced. Your plan to proceed is acceptable. Pat, please contact me on Monday for an update. Feel free to call if there are additional developments. Tom Maunder, PE AOGCC 1 of 1 7/25/2005 9:05 AM • • Subject: 1E-170 Intermediate Cement From: "Reilly, Patrick J" <Patrick.J.Reilly@conocophillips.com> Date: Sat, 23 Jul 2005 13:03:49 -0800 To: <stmaunder@aol.com> CC: "Doyon 15 Company Man" <D15CM@conocophillips.com> Tom, We would like to proceed with drilling the laterals on this well patch after running the lateral completion equipment. ~ C~ S - d'~ ~-~ ~~ ~. We will install a casing The following is the chronology of events on the 1E-170 intermediate casing tests: INITIAL CASING TEST After running the tie back string - Pressured up to 3000 psi, pressure immediately dropped to 300 psi. Tested surface equipment to 3000 psi - OK. 1ST RTTS RUN Tested from 5059' - 10306' for 15 minutes at 3000 psi. - OK Tested from Surface to 4812' for 15 minutes at 3000 psi. - OK Tested 13 3/8" x 9 5/8" annulus from the surface to the ZXP for 10 minutes at 1000 psi. - OK Performed infectivity test with oil based mud in the hole 1.0 BPM @ 1080 psi 1.5 BPM @ 1370 psi 2.0 BPM @ 1710 psi - Shut in, pressure dropped to 475 psi in 1 minutes 1ST CEMENT SQUEEZE - 20 BBLS - NO HESITATION Placed high vis pill just below the leak point Pumped 18 bbls out of the casing leaving 2 bbls inside the casing (assuming no cement running on the low side below the pill) Pressured up to 2400 psi (last 2 bbls) Bled off Waited on cement (CIP 2345 hrs, ZO July) TOOH for drilling assembly 1ST CEMENT CLEAN OUT AND SQUEEZE TEST RIH with drilling assy. Pressured up to 1000 psi, shut in, pressure dropped to 430 psi in 5 minutes. TOOH for RTTS. 2ND RTTS RUN & 2ND CEMENT SQUEEZE 20 BBLS - HESITATION RIH w/RTTS and reconfirmed leak location Pumped second cement squeeze Squeezed 10 bbls @ 1.0 bpm, STOP, pressure @ 1240 psi Pressure dropped to 1029 in 5 minutes Squeezed 5 bbls @ 1.0 bpm, STOP; pressure @ 1794 psi Pressure dropped to 1258 in 15 minutes Squeezed 1 bbl @ 0.5 bpm, STOP, pressure at 1551psi Pressure dropped to 905 psi in 30 minutes (CIP 1105 hrs, 21 July) 2ND CEMENT CLEAN OUT AND SQUEEZE TEST RIH with clean out assembly 0630 hrs, 22 July (20 hours since batch mix) Pressure up to 1050, shut in. Pressure dropped to 950 psi immediately 900 psi @ 1.0 min 875 psi @ 1.5 min 825 psi @ 2 min 750 psi @ 4 min 750 psi @ 5 min 725 psi @ 10 min 700 psi @ 15 min 700 psi @ 20 min 690 psi @ 25 min 1 of 2 7/25/2005 9:06 AM 690 psi ~ 30 min Pat Reilly ConocoPhillips Alaska Drilling & Wells ~ pl (~' , r ~ h L,` (907) 265-6048 WORK l.J 7 V 1 { (907) 244-5558 CELLULAR (907) 265-1535 FAX Patrick.J.Reill Conoco hilli s.com __f"i"~, ya: P P -~ J «Patrick . J. Reil ly~~conocophillips . com. ~rcf» ~~ r f Pat Reilly ConocoPhillips Alaska Drilling & Wells (907) 265-6048 WORK (907) 244-5558 CELLULAR (907) 265-1535 FAX Patrick.J.Reillvraconocophillips.com 1E-170 Intermediate Cement.eml _ _.._.._ 2 of 2 7/25/2005 9:06 AM tce: uuunua~iun iur y pia ripe tcepair on ir.-i iu Subject: Re: Information for 9 5/8" Pipe Repair on 1E-170 From: Thomas Maunder<tom maunder@admin.state.ak.us> Date: Thu, 21 Ju12005 11:23:59 -0800 To: NSK Fld Drlg Supv <n1335@conocophillips.com> CC: Mike.R.Greener@conocophillips.com • Steve and Mike, Thanks for the additional information. From the pressure response, it appears that the leak was successfully squeezed. 2400 psi at 2 bpm isn't bad at all. I agree that testing the casing/squeeze to a lower pressure due to the potential to damage the tieback is appropriate at recommended by your equipment provider. The MASP lies between the 1000 and 1500 psi test pressures that have been proposed. The MASP is calculated with a gas gradient of (0.1 psi/ft) making the calculated pressure high and therefore conservative. In normal drilling operations well pressures should not approach this value even when a well control situation is considered. The ultimate test pressure value is CPAI's to determine, but I agree with what appears to the minimum of 1000 psi. Tom Maunder, PE AOGCC NSK Fld Drlg Supv wrote: Tom, Mike has called the rig and they have agreed to pressure testing the 9 5/8" casing to 1000 psi in order to prevent any further damage to the suspect crossover. The squeeze operations took 20 bbls of cement with all that volume going into the 13 3/8" X 9 5/8" annulus as calculated from the displacement. At 2 bpm the pressure stepped up progressively to +/-2400 psi making it appear that a good squeeze was obtained on the lap area. The leakoff tests in this area of the West Sak have normally been in the range of 450 to 600 psi surface pressure with a 9.0 ppg mud, which is what they should be drilling out with. Once the three laterals have been drilled and all the liners are run a 9 5!8" casing patch will be run across the area of the damaged crossover for improving casing integrity in the future. Upon the successful execution of that procedure the ESP completion will be run. Thanks Steve 1 of 1 7/21/2005 2:43 PM P VV . 11:.-1 / V 111LG1111GU1[LLG G4Sll1~' 1CZLK • • Subject: FW: 1E-170 Intermediate casing leak From: "Greener, Mike R." <Mike.R.Greener@conocophillips.com> Date: Thu, 21 Ju12OO5 10:09:58 -0800 To: Tom Maunder <tom maunder@admin.state.ak.us> -----Original Message----- From: Greener, Mike R. Sent: Thursday, July 21, 2005 9:49 AM To: Tom Maunder' Cc: Thomas, Randy L Subject: 1E-170 Intermediate casing leak v ~. ~-'~ _~~ ~~ This is an update on the casing leak tl-lat I visited with you about the other night on the phone. The leak was determined to be in a collar on a crossover pup joint directly below the liner hanger. Last night we squeezed the: leak with 20 bbls of Class "G" cement. We pumped 18 bbls through the Icak and left 2 bbls inside the 9-5/$" casing. The volume below the RTTS packer to the leak was slightly over 4 bbls. The 9-S/8" ~ 13-3/8" annulus volume from the leak to the 1.3-3/8" shoe was 11.9 b61s. We are currently picking up our BH~1 to @ in. and drill out what cement is left inside the 9-518" casing. Casing movement calculations from Baker indicate that if we pressure to 3,000 psi we tiviil be putting the rnaxi_muan load on the tieback string packer. I am recommending that yve onl:y pressure to 1,500 psi with the plan to place a casing patch across the leak area. after we have .~ni.shed placing into the well all the liner hook equipment and :lateral entry equipment ghat «•e :hare to run. i_n th.e ~.vell. The casing patch is to ensure future casing integrity as a back up to the cement squeeze. Mike Greener Senior Drilling Engineer 907.263.4820 1 of 1 7/21/2005 2:42 PM ~, ~ ~ --~ 1~~ ~~ ALASSA OIL A1QD GAS COI~TSERVA~`IO1~T COIrIMISSIOIQ Randy Thomas Greater Kuparuk Area Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 FRANK H. MURKOWSKl, GOVERNOR 333 W. T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Re: Kuparuk 1 E-170L 1 ConocoPhillips Alaska, Inc. Permit No: 205-075 Surface Location: 247' FNL, 641' FEL, SEC. 21, T11N, RlOE, UM Bottomhole Location: 1322' FSL, 174' FWL, SEC. 34, T11N, R10E, UM Dear Mr. Thomas: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to ss any required test. Contact the Commission's petroleum field inspector at ~90~.C~59-3 (pa er). DATED this~day of May, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation wlo encl. ConocoPhillips ~ Alaska Post Office Box 100360 Anchorage, Alaska 99510-0360 Randy Thomas Phone (907) 265-6830 Email: Randy.L.Thomas@conocophillips.com May 4, 2005 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill, West Sak Producer, 1E-170 Li Dear Commissioners: ~- _ ffi. tjs4~~~r ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill for an onshore production wellbore, the upper lateral wellbore of a multilateral horizontal well, in the West Sak ~~B" sand. The main bore of this well will be designated 1E-170 and has been permitted under a separate application, submitted on May 4, 2005. This application is for the upper lateral of that well, to be designated 1E-170 Ll. The expected date that operations will begin on 1E-170 L1 is June 18, 2005. Please find attached for the review of the Commission a Form 10-401 and the information required by 20 ACC 25.005 for each of this well bore. Please contact Mike Greener at 263-4820 if more information is needed to issue a Permt to Drill for 1E- 170 L1. Sincerely, Randy Thomas GKA Drilling Team Leader s • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 ~5~ i~ 1 a. Type of Work: Drill ~ Redrill 1 b. Current Well Class: Exploratory Development Oil ~ Multiple Zone ^ Re-entry ^ Stratigraphic Test ^ Service ^ Development Gas ^ Single Zone ^/ 2. Operator Name: 5. Bond: ~ Blanket Single Well 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 1 E-170L1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 15650' ~ TVD: 3258' Kuparuk River Field 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 247' FNL, 641' FEL, Sec. 21, T11 N, R10E, UM '~ ADL 25660 West Sak Oil Pool Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2168' FSL', 221' FWL, Sec. 27, T11 N, R10E UM -~ ALK 470 6/18!2005 Total Depth: 9. Acres in Property: 14. Distance to 1322' FSL, 174' FWL, Sec. 34, T11 N, R10E, UM "` 2560 Nearest Property: 4639' at surface 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest ~ i E- ! I'7LT !52» Surface: x- 549890 y- 5959340 Zone- 4 (Height above GL): 28' RKB feet Well within Pool: 1 ~ mss' zzS°"-T 16. Deviated wells: Kickoff depth: 9523 ~ ft. 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) g s ~o, c,; Maximum Hole Angle: 91° deg Downhole: 1466 psig Surface: 1108 psig° 18. Casing Program S ecifications Setting Depth Quantity of Cement Size p Top Bottom c. f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" x 34" 94# K-55 Welded 80' 28' 28' 108' 108' 260 cf ArcticCRETE 16" 13-3/8" 68# L-80 BTC 5086' 28' 28' 5086' 2317' 980 sx ASLite, 260 sx DeepCRETE 12.25" 9-5/8" 40# L-80 BTCM 10433' 28' 28' 10433' 3447' 790 sx DeepCRETE 8.5" 5.5" 15.5# L-80 BTCM 6127' 9523' 3305' 15650' 3258' slotted liner 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Casing Length Size Cement Volume MD ND Structural Conductor Surface Intermediate Production Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Filing Fee ~ BOP Sketch Drilling Program ~ Time v. Depth Plot Shallow Hazard Analysis Property Plat ^ Diverter Sketch ^ Seabed Report ^ Drilling Fluid Program Q 20 AAC 25.050 requirements ^/ 21. Verbal Approval: Commission Representative: Date: 22. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mike Greener @ 263-4820 Printed Name Randy Thomas Title Greater Kuparuk Area Drilling Team Leader Signature '~ l Phone ~~~-8 ; O Date S /Y/O a h ll Commission Use Only Permit to Drill API Number: Permit Approval See cover letter Number: `~.~„j ~' ~~ ~ G~ 50- (~ ~ ! ~ ~3 ~~o ~' ~ ~ Date: for other requirements Conditions of approval am les required Yes ^ No ~ Mud log required Yes ^ No ogen sulfide me a sures Yes ~ No ^ Directional. survey required Yes ?~ No ^ g ~ Other: c ~,~y~ t..t \j®~ ~g.~ ~ / APPROVED BY ~/ ~ D Approve y THE COMMISSION Date. !( J Form 10-401 Revised 06/2004 ~ ~ ~ ~ ~ ~ ~ Submit in Duplicate ~lication for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 Permit It -West Sak Well #1 E-170 L1 ("B" Sand) Application for Permit to Drill Document YJell VQlue Table of Contents 1. Well Name ................................................................................................................. 2 Requirements of 20 AAC 25.005 (fl ....................................................................................................... 2 2. Location Summary ................................................................................................... 2 Requirements of 20 AAC 25.005(c)(2) ................................................................................................... 2 Requirements of 20 AAC 25.050(b) ....................................................................................................... 2 3. Blowout Prevention Equipment Information ......................................................... 3 Requirements of 20 AAC 25.005(c)(3) ................................................................................................... 3 4. Drilling Hazards Information ................................................................................... 3 Requirements of 20 AAC 25.005 (c)(4) .................................................................................................. 3 5. Procedure for Conducting Formation Integrity Tests ........................................... 3 Requirements of 20 AAC 25.005 (c)(5) .................................................................................................. 3 6. Casing and Cementing Program ............................................................................ 4 Requirements of 20 AAC 25.005(c)(6) ................................................................................................... 4 7. Diverter System Information ................................................................................... 4 Requirements of 20 AAC 25.005(c)(7) ................................................................................................... 4 8. Drilling Fluid Program ............................................................................................. 5 Requirements of 20 AAC 25.005(c)(8) ................................................................................................... 5 Lateral Mud Program (MI FloPro NT) ..................................................................................................... 5 9. Abnormally Pressured Formation Information ..................................................... 5 Requirements of 20 AAC 25.005 (c)(9) .................................................................................................. 5 10. Seismic Analysis ..................................................................................................... 5 Requirements of 20 AAC 25.005 (c)(10) ................................................................................................ 5 11. Seabed Condition Analysis ..................................................................................... 5 Requirements of 20 AAC 25.005 (c)(11) ................................................................................................ 5 12. Evidence of Bonding ............................................................................................... 5 Requirements of 20 AAC 25.005 (c)(12) ................................................................................................ 5 1E-170 L1 PERMIT IT.doc Page 1 of 6 ~ ~ ~ Panted: May 4, 2005 ~x ~ a f~& ~'~~ Mlication for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 13. Proposed Drilling Program ..................................................................................... 6 Requirements of 20 AAC 25.005 (c)(13) ................................................................................................ 6 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 6 Requirements of 20 AAC 25.005 (c)(14) ................................................................................................ 6 15. Attachments ............................................................................................................. 6 Attachment 1 Directional Plan (8 pages) ................................................................................................ 6 Attachment 2 Drilling Hazards Summary (1 page) ................................................................................. 6 Attachment 3 Well Schematic (1 pages) ............................................................................................... 6 1. Well Name Requirements of 20 AAC 25.005 (fl Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.04o(b}. For a well with multrp/e we/l branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. The well for which this Application is submitted will be designated as 1E-170 Li. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fde with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A}the rnordinates of the proposed ration of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines (B} the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administratior,~ (C} the proposed depth of the we/f at the top of each objective formation and at total depth; Location at Surface FNL:246.91' FEL:640.83' Sec 21, T11N/R10E UM ~ ASPZone 4 NAD 27 Coordinates RKB Elevation 98.8' AMSL Northings; 5,959,340 Eastings; 549,890 Pad Elevation 70.8' AMSL Location at Top of Productive Interval West Sak "B" Sand FSL:2168', FWL:221', Sec 27, T11N/R10E, UM ASP Zone 4 NAD 27 Coordinates Measured De th RKB.' 9 523' Northings;5,951,201 Eastings; 550,823 Total 1/ertical De th, RKB; 3 305' Total 1/ertical De th SS.' 3 194' Location at Total De th FSL:1322' FWL:174', Sec 34 T11N/R10E, UM ASP Zone 4 NAD 27 Coordinates Measured De th RKB,' 15 650' Northings: 5,945,076 Eastings: 550,830 Total 1/ertica! De th RKB; 3 258' Total t/ertica/ De th SS.' 3,148' and (D} other information required by 20 AAC25.050(b); Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Farm 10-401} must 1E-170 L1 PERMIT /T.doc Page 2 of 6 Printed.' May 4, 2005 ORIGINAL ~lication for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 (I) include a p/at, drawn to a suitab/e sca/e, showing the path of the proposed wellbore, including a//adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 1: Directional Plan and (2) for al/ wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been famished a copy of the application by certified mail; or (B) state that the app/icant is the on/y at1`ected owner. The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An app/ication for a Permit to Dnll must be accompanied by each of the fo/%wing items, except for an item already on file with the commission and identified in the application: (3) a diagram and description of the b/owout prevention equipment (ROPE) as required by 20 AAC 25.035, 20 AAC 25.036, or 20 AAC25.037, asapplicab/e; An API 13-5/8" x 5,000 psi BOP stack (RSRRA) will be utilized to drill and complete well 1E-170 L1. Please see information on Doyon 141 blowout prevention equipment placed on file with the Commission. 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drilf must be accompanied by each of the following items, except for an item already on file with the commission and identified in the app/ication: (4) information on drilling hazards, including (A) the maximum downhofe pressure that maybe encountered, criteria used to determine it, and maximum potential sun`ace pressure based on a methane gradient; The expected reservoir pressures in the West Sak sands in the 1E-170 Li area vary from 0.0.42 to 0.0.45 s psi/ft, or 8.1 to 8.6 ppg EMW (equivalent mud weight). These pressures are predicted based on actual bottom hole pressure data from the nearby West Sak wells. The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.11) and the deepest planned vertical depth of the West Sak D sand formation is 1107.72 psi, calculated thusly: MPSP =(3,258 ft)(0.45 - 0.11 psi/ft) =1107.72 psi ~ (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. and (C) data concerning potentaa/causes of ho% probfems such as abnom~a/ly geo pressured strata, iost circulation zones, and zones that have a propensity for difi`erenta/sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drr/l must be accompanied by each of the fo/%wing items, except for an item a/ready on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC25.030(t); The parent wellbore, 1E-170, will be completed with 9 5/8" intermediate casing landed in the West Sak A-Sand. The casing shoe will be drilled out and a formation integrity test will be performed in accordance with the ~~Formation Integrity Test Procedure" that ConocoPhillips Alaska placed on file with the Commission. 1E->70 L1 PERMIT /T.doc Page 3 of 6 Printed: May 4, 2005 uRIGINAL ~lication for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An app/ication for a Permit to Drill must be accompanied by each of the fol%wing items, except for an item already on file with the eommr'ssion and identified in the application: (6) a comp/ete proposed easing and cementing program as required by 20 AAC 25.030, and a description ofany slotted liner, pre- perforated liner, or screen to be installed; Casing and Cementing Program See also Attachment 3 APD for 1E-170: Cement Summa Hole Top Btm Csy/Tbg Size Weight Length MDlrVD MD/TVD OD (in in) (Ib/ft) Grade Connection ft ft ft) Cement Pro ram 20 x 34 42 94 K55 Welded 80 28 / 28 108 J Cemented to surface with 260 cf 108 ArcticCRETE 13 3/8 16 68 L-80 BTC 5,086 28 / 28 5,086 / Cemented to Surface with 2,317 980 sx ASLite Lead, 260 sx Dee CRETE Tail 9 5/8 12 1/4 40 L-80 BTCM 10,433 28 / 28 10,433 / Cement Top planned @ 6,000' 3,447 MD j 2,439' TVD. Cemented w/ 790 sx Dee CRETE 5 1/2 8 1/2"'~A" 15.5 L-80 BTCM 5,386 10,433 / 15,819 / Slotted- no cement slotted Lateral 3,447 3,431 5 1/2 8 1/2" 15.5 L-80 BTCM 6,127 9,523 / 15,650 / Slotted- no cement slotted °B" Lateral 3,305 3,258 1E-170 L1 15.5 - BTCM 7,396 / 15,646 / Slotte -no ce nt slotted "D" Lateral 3,243 3,184 `'~---- 1E-170 L2 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Dril! must be accompanied by each of the following items, except for an item already on file with the commission and identified in the app/ication: (7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2); No diverter system will be utilized during operations on 1E-170 Ll 1E-170 L1 PERMIT /T.doc Page 4 of 6 Printed: May 4, 2005 f ~~'~.L ~lication for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An app/ication for a Permit to Dri// must be accompanied by each of the foi/owing items, except for an item a/ready on fi/e with the commission and identified in the application: (B) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 25.033,• Drilling will be done with muds having the following properties over the listed intervals: Lateral Mud Program (VersaPro, Oil Base Mudl Properties Value Densit ( ) 9.0 Funnel Viscosity (seconds) 30 Yield Point (cP) 18 - 28 Electric Stability 650 - 900 Chlorides (m /1) 40000 pH N/A API filtrate (cc /30 min) NA "'*HTHP filtrate (cc/30 min) <10 MBT (Ib /gal) NA Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Please see information on file with the Commission for diagrams and descriptions of the fluid system of Doyon 141 Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) An application for a Permit to Dril! must be accompanied by each of the fo/%wing items, except for an item a/ready on file with the commission and identified in the application: (9) for an exp/oratory or stratigraphic test we//, a tabulation setting out the depths ofpredieted abnarma//y geo pressured strata as required by 20 AAC 25.033(17; Not applicable: Application is not for an exploratory or stratigraphic test well. 9. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An application for a Permit to Ori/l must be accompanied by each of the fol%wing items, except for an item already on fi/e with the commission and identified /n the application: (10) for an exp/oratory or stratigraphic test wel% a seismic refraction or reflection anaiysis as required by 20 AAC 25.061(a); Not applicable: Application is not for an exploratory or stratigraphic test well. ~ 10. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An app/ication for a Permit to Dri/i must be accompanied by each of the following items, except for an item already on fi/e with the commission and identified in the application: (11) for a well drilled from an offshore platform, mobile bottom-founded structure, jack-up rig, or floating drilling vesse% an analysis ofseabed conditions as required by 20 AAC 25, 061(b); Not applicable: Application is not for an offshore well. 11. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An app/ication for a Permit to Oril/ must be accompanied by each of the fol%wing items, except for an item a/ready on file with the commission and identified in the application: (12) evidence showing that the requirements of 20 AAC 25.025 {Bonding}have been met; Evidence of bonding for Phillips Alaska, Inc. is on file with the Commission. 1E-170 L1 PERMIT /T.doc Page 5 of 6 ~~~~ Printed: May 4, 2005 ~~~~6i~~ ~ation for Permit to Drill, Well 1 E-170 L1 Revision No.O May 4, 2005 12. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Dri/l must be accompanied by each of the fol%wing items, except for an item already on file with the commission and identified in the application: The proposed drilling program for 1E-170 Li is listed below. Note: Previous operations are covered under the 1E-170 Application for Permit to Drill. .~ 1. Run and set Baker WindowMaster whipstock system, at window point of 9,523' MD / 3,305' TVD, the top of the B sand. 2. Mill 8 1/2" window. POOH. .~ 3. Pick up 81/2" drilling assembly with LWD and MWD and PWD. RIH. 4. Drill to TD of ~~B" sand lateral at 15,650' MD / 3,258' TVD, as per directional plan. 5. POOH, back reaming out of lateral. RIH and spot solids free OBM. POOH. 6. RIH with whipstock retrieval tool. Retrieve whipstock and POOH. 7. PU and run 5 i/2" slotted liner. 8. RIH, until liner hanger is just above window. Orient hanger to window and land hanger. 9. Release hanger running tool. 10. POOH and PU lateral entry module li. RIH with module and latch into the ~~B" sand hook hanger 12. POOH and prepare to drill the ~~D" sand lateral 1E-170 L2. 13. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill muste be accompanied by each of the following items, except for an item already on file with the rnmmission and identified in the application: (14) a genera/ description of how the operator p/ans to dispose of dri//ing mud and eutlrngs and a statement of whether the operator intends to request authorization under 2Q AAC 15.08a far an annu/ar disposal operation in the well.,' Waste fluids generated during the drilling process will be disposed of either by pumping authorized fluids into a permitted annulus on 1E Pad, or by hauling the fluids to a KRU Class II disposal well. All cuttings r generated will be disposed of either down a permitted annulus on lE Pad, hauled to the Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well, or stored, tested for hazardous substances, and (if free of hazardous substances) used on pads and roads in the Kuparuk area in accordance with a permit from the State of Alaska. 14. Attachments Attachment 1 Directional Plan Attachment 2 Drilling Hazards Summary Attachment 3 Well Schematic ~r~~ ~ ~~ ~~~~V 1E-170 L1 PERMIT /T.doc Page 6 of 6 Printed: May 4, 2005 • ConocoPhillips Alaska ConocoPhillips Alaska (Kuparuk) Kuparuk River Unit Kuparuk 1 E Pad Plan 1 E-170 L1 Plan: 1 E-1 ?0 L1 (wp04) Proposal Report 02 May, 2005 HALLIE~I.~F~TQN Sperry Drilling Services ORIGINAL /~~~w,M~~A ~~.~" -60 0 5000 X000 -3000 -2000 ~ West(-)/East(+) (2000 ft/in) -1000 0 1000 2000 000 4000 5000 MALLI 8p~rry Or 60 BURTON llllnp 8srvlc~a 00 1000 1000 ~° o Project: Kuparuk River Un t o Site: Kuparuk 1 E Pad ,70° Well: Plan 1 E-170 Wellbore: Plan 1 E-170 L1 -loon Plan: 1E-170 L1 (wp04) t73° -loon -2000 -2000 -3000 -3000 13 3l8" i , -4000 -4000 174° -5000 -5000 TOW ~ 21688 FSL 2218 FWL -Sec 27 - T11 N - R10E, 95238 MD, 33058 MD _... ~ \ __ ~ \ ,.-, -6000 -6000 ~ c o c_ ~ o 0 N -7000 BOW -Assume 13.6°DLS -95408 MD, 33078 TVD ~.1E-170 Lt T1 (wp04) I -7000 Z - __ _`_. O + ? r Z -8000 1 1E-170 L1 T2 (wpOM1( -8000 Q = End 30' Ratlale :Begin Build ~°I100R , 95708 MD, 33118 TVD . ~ O ~ 180° O ~ -9000 __ Sail ~ 9237%nc 8179.80°Azi : 97988 MD, 33208 T~ -~ -9000 ... i 180° t E-170 L1 T3 (wp041 ~, ~ -10000 Drop ~ 3°1100Rto 90.57%nc : 101068 MD, 330M TVD - - -10000 180° I1E-170 L1 T4 (wp04) '~, -11000 -11000 Begin GeoSteering in B-Sand -Target 17 Below top :101668 MD, 33068 TVD i -12000 180° _ -12000 1 E-170 L1 TS (wps4~ -13000 -13000 1E-170 L1 Toe (wp04) 181° -14000 i 51@" /~ -14000 T M Azimuths to True North -15000 Magnetic North: za.4s° -15000 Magnetic Fieltl Strength: 57880.4nT Dip Angle: 80.74° Date: 72/18/2004 - BHL ~ 13228 FSL 174ft FWL -Sec 34 - T11N - 810E ~ -16000 MotleI: BGGM2004 -16000 X 000 -5000 -4000 -3000 -2000 -1000 0 1000 2000 3000 4000 5000 60 00 West(-)/East(+) (2000 ft/in) ORIGINAL • ~ Haiiiburton Company Conoco Phillips Planning Report -Geographic Alaska Database: EDM 2003.11 Single User Db Local Co-ordinate References' Company: ConocoPhillips Alaska (Kuparuk) TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 1 E Pad North Reference: Well: Plan 1 E-170 Survey Calculation Method: Wellbore: Plan 1E-170 L1 Design: 1E-170 L1 (wp04) HALLIBURTON Sperry Drilling Services Well Plan 1 E-170 70.4 GL + 40 RT ~ 110.40ft (Doyon 15) 70.4 GL + 40 RT @ 110.40ft (Doyon 15) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Weil: Plan 1E-170 Well Position +N/-S 0.00 ft Northing: b,959,339.91 ft Latitude: 70° 17' 58.887" N +E/-W 0.00 ft Easting: 549,889.8d ft Longitude: 149° 35' 45.435" W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 70.40 ft Welibore Plan 1 E-170 L1 II Magnetics Modal Name :Sample Date Declination` Dip Angle Field Strength it bggm2004 12/16/2004 24.49 80.74 57,580 Design 1E-170 L1 (wp04) Audit Notes: Version: Phase: PLAN Tie On Depth: 9,523.07 `Vertical Section: Depth From (TVD) ' +N/-3 +E1-W Direction ER) (ft) (ft) (°) 40.00 0.00 0.00 180.00 Plan Summary Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +E/-W Rate Rate Rate TFO (~) (°) (ej (R) (~) (~) (°MOOft) (°/100ft) (°/100ft) (°) 9,523.07 81.00 179.77 3,305.16 -8,145.49 879.84 0.00 0.00 0.00 0.00 9,539.57 83.24 179.77 3,307.42 -8,161.83 879.91 13.60 13,60 0.00 0.00 9,569.57 83.24 179.77 3,310.95 -8,191.63 880.02 0.00 0.00 0.00 0.00 9,752.72 90.57 179.81 3,320.82 -8,374.38 880.69 4.00 4.00 0.02 0.31 9,797.75 92.37 179.80 3,319.67 -8,419.39 880.85 4.00 4.00 -0.03 -0.36 10,105.42 92.37 179.80 3,306.94 -8,726.80 881.93 0.00 0.00 0.00 0.00 10,165.46 90.57 179.81 3,305.40 -8,786.81 882.13 3.00 -3.00 0.02 179.64 10,189.53 89.85 179.76 3,305.31 -8,810.89 882.22 3.00 -2.99 -0.21 -175.97 11,365.65 89.85 179.76 3,308.40 -9,986.99 887.17 0.00 0.00 0.00 0.00 11,382.63 90.36 179.74 3,308.37 -10,003.98 887.24 3.00 3.00 -0.09 -1.75 12,175.79 90.36 179.74 3,303.40 -10,797.11 890.79 0.00 0.00 0.00 0.00 12,202.07 90.82 180.38 3,303.13 -10,823.39 890.76 3.00 1.75 2.44 54.34 14,423.24 90.82 180.38 3,271.40 -13,044.28 875.87 0.00 0.00 0.00 0.00 14,458.58 90.60 181.42 3,270.96 -13,079.62 875.31 3.00 -0.61 2.94 101.68 15,650.63 90.60 181.42 3,258.40 -14,271.23 845.72 0.00 0.00 0.00 0.00 5/212005 8:31:28PM Page 2 of 5 COMPASS 2003.118ui1d 48 ~~~ ~~ ~s t.~. ~€ . ~ ConotoPh~llips Alaska Halliburton Company Planning Report -Geographic ~ HALLIBURTON Sperry Drilling Services Database: ` EDM 2003.11 Single User Db ,Local Co-ordinate Reference: Well Plan 1 E-170 Company; ConocoPhillips Alaska (Kuparuk) TVD Referencet 70.4 GL + 40 RT (d 1 10.40ft (Doyon 15) Project: Kuparuk River Unit MD Reference: 70.4 GL + 40 RT @ 1 10.40ft (Doyon 15) Site: Kuparuk 1 E Pad North Reference: True Well: Plan 1 E-170 Survey Calculation Method:. Minimum Curvature Welibore: Plan 1 E-170 L1 Design: 1E-170 L1 (wp04) -- - ~ Geologic Targets Plan 1E-170 L1 TVD Target Name +N/.S +E/-W Northing Easting (ft - 8hap8 ft if ft (ft) O 3,303.40 1E-170 L1 T4 (wp04j -10,797.11 890.79 5,948,550.00 550,852.00 - Circle (radius 100.00) 3,308.40 1E-170 L1 T3 (wp04) -9,986.99 - Circle (radius 100.00) 3,271.40 1E-t70 L1 TS (wp04) -13,044.28 - Circle (radius 100.00) 3,309.40 1E-170 L1 T1 (wp04) -8,386.76 -Circle (radius 100.00) 3,258.40 1E-170 L1 Toe (wp04) -14,271.23 - Circle (radius 100.00) 3,305.40 1E-170 L1 T2 (wp04) -8,786.81 - Circle (radius 100.OD) Prognosed Casing Points Measured ' Verttcat Casing Hole Depth:: Depth Diameter Diameter 5,086.26 2,317.40 133/8 16 9,523.08 3,305.16 9-618 12-1l4 15,650.62 3,258.40 b-112 8-112 Prognosed Formation Intersection Points. Measured Vertical Depth Inclination Azimuth Depth +N/-E +E/-W (~) (^) (e) (ft) (ftl 7ft) 1,732.70 61.30 172.10 1,508.40 -609.88 123.91 2,335.83 76.87 173.95 1,692.40 -1,177.91 194.05 3,449.21 76.87 173.95 1,945.40 -2,256.11 308.41 5,086.26 76.87 173.95 2,317.40 -3,841.44 476.56 6,450.47 76.87 173.95 2,627.40 -5,162.56 616.68 7,436.23 76.87 173.95 2,851.40 -6,117.17 717.93 7,612.26 76.87 173.95 2,891.40 -6,287.63 736.01 8,347.17 76.87 173.95 3,058.40 -6,999.33 811.50 9,193.40 79.00 179.77 3,243.40 -7,821.67 878.54 9,408.28 79.00 179.77 3,284.40 -8,032.60 879.39 9,524.63 81.21 179.77 3,305.40 -8,147.03 879.85 887.17 5,949,360.00 550,843.00 875.87 5,946,303.00 550,852.00 880.79 5,950,960.00 550,826.00 845.72 5,945,076.00 550,830.00 882.13 5,950,560.00 550,830.00 Name Base of Permafrost T3 K15 T3 +676 Ugnu C Ugnu B Ugnu A K13 West Sak D West Sak C West Sak B 5x2/2005 8:31:28PM Page 5 of 5 COMPASS 2003.118ui1d 48 ~~ u ~b ConocoPhillips Alaska Database: EDM 2003.11 Single User Db ::.Company:.. ConocoPhillips Alaska (Kuparuk) Project: Kuparuk River Unit 'Site: Kuparuk 1E Pad Well: Plan 1E-170 Wellbore: Plan 1E-170 L1 Design: 1E-170 L1 (wp04) Halliburton Company Planning Report -Geographic HALLIBURTON Speny Drilling Services -Local Coordinate Reference: Well Plan 1E-170 'IVD Reference: 70.4 GL + 40 RT @ 110.40ft (Doyon 15} MD Reference: 70.4 GL + 40 RT @ 110.40ft (Doyon 15) North Reference: True Survey Calculation Method: Minimum Curvature ° Planned Survey 1E-170 L1 (wp04) Map Map MD inclination Azimuth TVD SSTVD +NIS +El-W Northing Easting DLSEV Vert Section (ft) (°) - (°) (ft) (ft) (ft) ft O (ft) (ft) (°/100ft ) (ft ) ` 9,523.07 81.00 179.77 3,305.16 3,194.76 -8,145.49 879.84 5,951,201.23 550,823.45 0.00 8,145.49 TOW ~ 2188ft FSL 221ft FWL -Sec 2T - Ti1N - R10E, 9523ft MD, 3305ft MD - 9 Sl8" r 9,524.63 81.21 179.77 3,305.40 3,195.00 -8,147.03 879.85 5,951,199.69 550,823.47 13.60 8,147.03 West Sak B 9,539.57 83.24 179.77 3,307.42 3,197.02 -8,161.83 879.91 5,951,184.89 550,823.62 13.60 8,161.83 BOW -Assume 13.6°DLS - 9540ft MD, 3307ft TVD 9,556.40 83.24 179.77 3,309.40 3,199.00 -8,178.55 879.97 5,951,168.18 550,823.80 0.00 8,178.55 9,569.57 83.24 179.77 3,310.95 3,200.55 -8,191.63 880.02 5,951,155.10 550,823.94 0.00 8,191.63 End 30' Rathole :Begin Build ~°i100ft , 9570ft MD, 3311ft TVD 9,600.00 84.46 179.78 3,314.21 3,203.81 -8,221.88 880.14 5,951,124.85 550,824.26 3.99 8,221.88 9,700.00 88.46 179.80 3,320.38 3,209.98 -8,321.67 880.51 5,951,025.08 550,825.29 4.00 8,321.67 9,752.72 90.57 179.81 3,320.82 3,210.42 -8,374.38 880.69 5,950,972.37 550,825.82 4.00 8,374.38 9,797.75 92.37 179.80 3,319.67 3,209.27 -8,419.39 880.85 5,950,927.37 550,826.28 4.00 8,419.39 Sail ®92.37°inc & 179.80°Azi : 9798ft MD, 3320ft TVD 9,800.00 92.37 179.80 3,319.58 3,209.18 -8,421.64 880.86 5,950,925.12 550,826.30 0.00 8,421.64 9,900.00 92.37 179.80 3,315.44 3,205.04 -8,521.56 881.21 5,950,825.22 550,827.31 0.00 8,521.56 10,000.00 92.37 179.80 3,311.30 3,200.90 -8,621.47 881.56 5,950,725.32 550,828.33 0.00 8,621.47 10,100.00 92.37 179.80 3,307.16 3,196.76 -8,721.39 881.91 5,950,625.42 550,829.34 0.00 8,721.39 10,105.42 92.37 179.80 3,306.94 3,196.54 -8,726.80 881.93 5,950,620.01 550,829.40 0.00 8,726.80 Drop Q 3°/100ft to 90.57° Inc : 10105ft MD, 3307ft TVD 10,165.46 90.57 179.81 3,305,40 3,195.00 -8,786.81 882.13 5,950,560.00 550,830.00 3.00 8,786.81 Begin GeoSteering in BSand -Target 12' Beiow top : 10185ft MD, 3305ft TVD -1 E-170 L7 T2 (wp04) 10,189.53 89.85 179.76 3,305.31 3,194.91 -8,810.89 882.22 5,950,535.93 550,830.25 3.00 8,810.89 10,200.00 89.85 179.76 3,305.34 3,194.94 -8,821.36 882.27 5,950,525.46 550,830.36 0.00 8,821.36 10,300.00 89.85 179.76 3,305.60 3,195.20 -8,921.36 882.69 5,950,425.48 550,831.45 0.00 8,921.36 10,400.00 89.85 179.76 3,305.86 3,195.46 -9,021.36 883.11 5,950,325.49 550,832.53 0.00 9,021.36 10,500.00 89.85 179.76 3,306.13 3,195.73 -9,121.35 883.53 5,950,225.51 550,833.62 0.00 9,121.35 10,600.00 89.85 179.76 3,306.39 3,195.99 -9,221.35 883.95 5,950,125.52 550,834.70 0.00 9,221.35 10,700.00 89.85 179.76 3,306.65 3,196.25 -9,321.35 884.37 5,950,025.54 550,835.78 0.00 9,321.35 10,800.00 89.85 179.76 3,306.91 3,196.51 -9,421.35 884.79 5,949,925.56 550,836.87 0.00 9,421.35 10,900.00 89.85 179.76 3,307.18 3,196.78 -9,521.35 885.21 5,949,825.57 550,837.95 0.00 9,521.35 11,000.00 89.85 179.76 3,307.44 3,197.04 -9,621.35 885.63 5,949,725.59 550,839.04 0.00 9,621.35 11,100.00 89.85 179.76 3,307.70 3,197.30 -9,721.35 886.05 5,949,625.60 550,840.12 0.00 9,721.35 11,200.00 89.85 179.76 3,307.97 3,197.57 -9,821.35 886.47 5,949,525.62 550,841.20 0.00 9,821.35 11,300.00 89.85 179.76 3,308.23 3,197.83 -9,921.34 886.89 5,949,425.64 550,842.29 0.00 9,921.34 11,365.65 89.85 179.76 3,308.40 3,198.00 -9,986.99 887.17 5,949,360.00 550,843.00 0.00 9,986.99 1E-170 L1 T3 (wp04j 11,382.63 90.36 179.74 3,308.37 3,197.97 -10,003.98 887.24 5,949,343.01 550,843.19 3.00 10,003.98 11,400.00 90.36 179.74 3,308.26 3,197.86 -10,021.34 887.32 5,949,325.65 550,843.38 0.00 10,021.34 11,500.00 90.36 179.74 3,307.63 3,197.23 -10,121.34 887.76 5,949,225.67 550,844.49 0.00 10,121.34 11,600.00 90.36 179.74 3,307.01 3,196.61 -10,221.34 888.21 5,949,125.69 550,845.60 0.00 10,221.34 11,700.00 90.36 179.74 3,306.38 3,195.98 -10,321.33 888.66 5,949,025.71 550,846.71 0.00 10,321.33 11,800.00 90.36 179.74 3,305.75 3,195.35 -10,421.33 889.11 5,948,925.72 550,847.82 0.00 10,421.33 11,900.00 90.36 179.74 3,305.13 3,194.73 -10,521.33 889.55 5,948,825.74 550,848.94 0.00 10,521.33 12,000.00 90.36 179.74 3,304.50 3,194.10 -10,621.32 890.00 5,948,725.76 550,850.05 0.00 10,621.32 5/2/2005 8:31:28PM Page 3 of 5 COMPASS 2003.11 Build 48 ~~~iv 1E ConocoPhillips Alaska Database: EDM 2003.11 Single User Db Company: ConocoPhillips Alaska (Kuparuk) Project: Kuparuk River Unit Site: Kuparuk 1E Pad Well: `Plan 1E-170 Wellbore: Plan 1 E-170 L1 Design: 1E-170 L1 (wp04) Halliburton Company Planning Report -Geographic HALLIBURTON Sperry Drilling Services Local Ca-ordinate R®ference: Well Plan 1 E-170 TVD Reference: 70.4 GL + 40 RT @ 110.40ft (Doyon 15) MD Reference: 70.4 GL + 40 RT @ 110.40ft (Doyon 15) North Reference: "True Survey Calcuiatioh Method: Minimum Curvature Planned Survey 1E-170 L1 (wp04) I Map Map MD Inclination Azimuth TVD SSTVD +N/S +E/-W Northing Fasting DLSEV Vert Section (ft) (°)` (°) _ (ft1 (ftl (ft) (ft) (ft) (ft) f°l100ft) fftl 12,100.00 90.36 179.74 3 303.87 3 193.47 -10 721.32 890.45 5 948,625.78 550 851.16 0.00 10,721.32 12,175.79 90.36 179.74 3,303.40 3,193.00 -10,797.11 890.79 5,948,550.00 550,852.00 0.00 10,797.11 1 E-170 L1 T4 (wp04) 12,200.00 90.78 180.33 3,303.16 3,192.76 -10,821.32 890.77 5,948,525.80 550,852.14 3.00 10,821.32 12,202.07 90.82 180.38 3,303.13 3,192.73 -10,823.39 890.76 5,948,523.73 550,852.15 3.00 10,823.39 12,300.00 90.82 180.38 3,301.73 3,191.33 -10,921.31 890.10 5,948,425.82 550,852.14 0.00 10,921.31 12,400.00 90.82 180.38 3,300.30 3,189.90 -11,021.29 889.43 5,948,325.84 550,852.13 0.00 11,021.29 12,500.00 90.82 180.38 3,298.87 3,188.47 -11,121.28 888.76 5,948,225.86 550,852.13 0.00 11,121.28 12,600.00 90.82 180.38 3,297.45 3,187.05 -11,221.27 888.09 5,948,125.88 550,852.12 0.00 11,221.27 12,700.00 90.82 180.38 3,296.02 3,185.62 -11,321.26 887.42 5,948,025.89 550,852.11 0.00 11,321.26 12,800.00 90.82 180.38 3,294.59 3,184.19 -11,421.24 886.75 5,947,925.91 550,852.11 0.00 11,421.24 12,900.00 90.82 180.38 3,293.16 3,182.76 -11,521.23 886.08 5,947,825.93 550,852.10 0.00 11,521.23 13,000.00 90.82 180.38 3,291.73 3,181.33 -11,621.22 885.41 5,947,725.95 550,852.09 0.00 11,621.22 13,100.00 90.82 180.38 3,290.30 3,179.90 -11,721.21 884.74 5,947,625.97 550,852.09 0.00 11,721.21 13,200.00 90.82 180.38 3,288.87 3,178.47 -11,821.19 884.07 5,947,525.99 550,852.08 0.00 11,821.19 13,300.00 90.82 180.38 3,287.45 3,177.05 -11,921.18 883.40 5,947,426.01 550,852.07 0.00 11,921.18 13,400.00 90.82 180.38 3,286.02 3,175.62 -12,021.17 882.73 5,947,326.03 550,852.07 0.00 12,021.17 13,500.00 90.82 180.38 3,284.59 3,174.19 -12,121.16 882.06 5,947,226.05 550,852.06 0.00 12,121.16 13,600.00 90.82 180.38 3,283.16 3,172.76 -12,221.14 881.39 5,947,126.07 550,852.05 0.00 12,221.14 13,700.00 90.82 180.38 3,281.73 3,171.33 -12,321.13 880.72 5,947,026.09 550,852.05 0.00 12,321.13 13,800.00 90.82 180.38 3,280.30 3,169.90 -12,421.12 880.05 5,946,926.11 550,852.04 0.00 12,421.12 13,900.00 90.82 180.38 3,278.87 3,168.47 -12,521.11 879.38 5,946,826.13 550,852.03 0.00 12,521.11 14,000.00 90.82 180.38 3,277.45 3,167.05 -12,621.09 878.71 5,946,726.15 550,852.03 0.00 12,621.09 14,100.00 90.82 180.38 3,276.02 3,165.62 -12,721.08 878.04 5,946,626.17 550,852.02 0.00 12,721.08 14,200.00 90.82 180.38 3,274.59 3,164.19 -12,821.07 877.37 5,946,526.19 550,852.01 0.00 12,821.07 14,300.00 90.82 180.38 3,273.16 3,162.76 -12,921.06 876.69 5,946,426.21 550,852.01 0.00 12,921.06 14,400.00 90.82 180.38 3,271.73 3,161.33 -13,021.04 876.02 5,946,326.23 550,852.00 0.00 13,021.04 14,423.24 90.82 180.38 3,271.40 3,161.00 -13,044.28 875.87 5,946,303.00 550,852.00 0.00 13,044.28 1E-170 L1 T5 (wp04) 14,458.58 90.60 181.42 3,270.96 3,160.56 -13,079.62 875.31 5,946,267.66 550,851.68 3.00 13,079.62 14,500.00 90.60 181.42 3,270.52 3,160.12 -13,121.02 874.28 5,946,226.26 550,850.92 0.00 13,121.02 14,600.00 90.60 181.42 3,269.47 3,159.07 -13,220.98 871.80 5,946,126.29 550,849.11 0.00 13,220.98 14,700.00 90.60 181.42 3,268.42 3,158.02 -13,320.95 869.32 5,946,026.32 550,847.29 0.00 13,320.95 14,800.00 90.60 181.42 3,267.36 3,156.96 -13,420.91 866.84 5,945,926.35 550,845.47 0.00 13,420.91 14,900.00 90.60 181.42 3,266.31 3,155.91 -13,520.87 864.35 5,945,826.39 550,843.65 0.00 13,520.87 15,000.00 90.60 181.42 3,265.26 3,154.86 -13,620.84 661.67 5,945,726.42 550,841.83 0.00 13,620.84 15,100.00 90.60 181.42 3,264.20 3,153.80 -13,720.80 859.39 5,945,626.45 550,840.01 0.00 13,720.80 15,200.00 90.60 181.42 3,263.15 3,152.75 -13,820.76 856.91 5,945,526.48 550,838.19 0.00 13,820.76 15,300.00 90.60 181.42 3,262.09 3,151.69 -13,920.73 854.42 5,945,426.51 550,836.38 0.00 13,920.73 15,400.00 90.60 181.42 3,261.04 3,150.64 -14,020.69 851.94 5,945,326.55 550,834.56 0.00 14,020.69 15,500.00 90.60 181.42 3,259.99 3,149.59 -14,120.65 849.46 5,945,226.58 550,832.74 0.00 14,120.65 15,600.00 90.60 181.42 3,258.93 3,148.53 -14,220.62 846.98 5,945,126.61 550,830.92 0.00 14,220.62 ~ 15,650.63 90.60 181.42 3,258.40 3,148.00 -14,271.23 845.72 5,945,076.00 550,830.00 0.00 14,271.23 BHL @ 1322ft FSL 174ft FlNL -See 34 - T71 N - R10E : 15651ft MD, 3258ft TVD - 5 1 /2" -1 E-170 L 1 Toe (wp04) 5/2/2005 8:31:28PM Page 4 of 5 COMPASS 2003,11 Build 48 ~~~~'.. • • ConocoPhillips Alaska ConocoPhillips Alaska (Kuparuk Kuparuk River Unit Kuparuk 1 E Pad Plan 1 E-170 L1 Anticollision Summary 02 May, 2005 HALL.IBt~RTt~N Sperry Drilling Services eR~s~Na~ St1RVEY PROGRAM ~ ~ ConocoPhillips Alaska (Kuparuk) ~ ~ ANTI-COLLISION SETTINGS Date: 200505-02700:00:00 Validated: Yes Version: Depth FromDepth To Survey/Plan Tool 40.00 812.00 CB-GYRO-SS 812.00 9523.07 MWD+IFR-AK-CAZ-SC 9523.0715650.63 IE-170 Ll (wp04) MWD+IFR-AK-CAZ-SC zoo 180 Engineering West Sak Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Trav. Cylinder North Error Surface: Elliptical Conic Warning Method: Rules Based so Travelling Cylinder Azimuth (TFO+AZI) ~°~ vs Centre to Centre Separation X100 f~n~ NAD 27 ASP Zone 4 : WELL DETAILS: Plan 1 E-170 L1 (wp04) Ground level: 70.40 +WS +EI-W Northing Fasting Latiltude Longitude Slot 0.00 0.00 b959339.91 549889.64 70°1T58.887N 149°35'45.435W REFERENCEINFDRMATION Co-ordinate (WE) Reference: WHI Plan 1E-170, True North Vertical (TVD) Reference: 70.4 GL + 40 RT ~ 110.408 (Doyan 15) Section (VS) Reference: Slot - (O.OON, O.OOE) Measured Depth Reference: 70.4 GL + 40 RT ~ 110.408 (Doyon 15) Calculation Method: Minimum Curvature From Colour To MD 0 112 112 212 212 462 462 712 712 962 962 1462 1462 1962 1962 2462 2462 2962 2962 3462 3462 4962 4962 6462 6462 -- 7962 7962 9462 9462 10962 10962 12462 12462 13962 13962 16462 0 180 Travelling Cylinder Azimuth (TFO+AZI) (°~ vs Centre to Centre Separation X15 $/ink Sec MD K Aa NO aW5 1 95230] 8100 1]9.]] 3305.16 -014549 2 9539.5] 8].2I i)9.]] J30].42 -016183 3 BSBB.S] 83.24 1]9]7 331085 -01918] 0 9]52.]2 90.5] 1]9.81 332082 -03]438 5 8]9].]5 923] 1]9.80 33198] JW1939 8 10105.42 923) 1]9.80 330884 -8]2660 ] 1016546 90.5] 1]9.81 3305.40 -0]8681 6 10189.53 89.85 1]9.]6 3306.31 461069 9 1136565 89.85 1]9.]6 ]308.40 -99%99 1011382.83 90.36 1]9.]4 3308.3]-1000398 11121]5.]9 90.3fi 1]9.]4 3303.40-10]9]11 12122020] 80.82 18038 3Y13 13-10823 39 1J 1442334 80.82 160.38 32]1.40-13044.26 1414458.59 9D.60 181/2 3Z]0.%-130]962 1515650.63 80.60 181 t2 1258.40-142]123 W J5~ T°~ 0. 13.80 00 91 000 9181 83 000 • 00 000 819183 0.31 83]4 38 4.Op o.ro 4).38 841939 9.m a]z6.eo 3.00 3.00 179,84 8]8681 tE-170 L1 R(wp04) -1]5.9] 891089 0.00 0.00 998889 tE-1]0 L1 T3 (wp04) 3.00 0.00 -1.751000398 0.0010]87.11 tE-170L1 T4 (wp0e 3.00 51.311082339 0.00 ao° 00013(M438 tE-170L1 T5 (wp01) ml.6e 13me6z o.o° °.°e 14nTZ3 tE-l7o Li T°°(w90/) Interpolation Method: MD Interval: 25Stations Depth Range From: 9523.07 To 15651 Maximum Range:5000 Reference: Plan: 1E•170L1 (wp04) 90 ConocoPh~ll~ps Alaska Company: ConocoPhillips Alaska (Kuparuk) Project: Kuparuk River Unit Reference Site: Kuparuk 1 E Pad Site Error: O.OOft Reference Well: Plan 1 E-170 Well Error: O.OOft Reference Wellbore Plan 1E-170 L1 Reference Design:. 1E-170 L1 (wp04) Halliburton Company • A f II' ' R tt HALLIBURTON n Ico Islon epo Sperry Drilling Services .local Co-ordinate Reference: Well Plan 1 E-170 TW Reference:. 70.4 GL + 40 RT ~ 110.40ft (Doyon 15) MD Reference: 70.4 GL + 40 RT @ 110.40ft (Doyon 15) `North Reference: True Survey Calculation Metfaod>- Minimum Curvature .Output errors are at 2.00 sigma Database; EDM 2003.11 Single User Db OffsetTW Reference: Offset Datum Reference 1E-170 L1 (wp04) Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.OOft Error Model: ISCWSA Depth Range: 9,523.07 to 15,651.OOft Scan Method: Trav. Cylinder North Results Limited by: Maximum center-center distance of 5,000.OOft Error SurFace: Elliptical Conic Warning Levels evaluated at: 0.00 Sigma Survey Tool Program pate 5/2/2005 From To (ft) (ft) Survey (Wellbore) Toot Name Description 40.00 812.00 1 E-170 (wp04) (Plan 1 E-170) CB-GYRO-SS Camera based gyro single shot 812.00 9,523.07 1E-170 (wp04) (Plan 1E-170) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 9,523.07 15,650.63 1E-170 L1 (wp04) (Plan 1E-170 L1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Summary Reference "Offset. Centre to No-Go Allowable .Measured Measured 'Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well -Wellbore. -Design (ft)_ {ft)` (ft) (ft) Kuparuk 1E Pad 1 E-35 - 1 E-35 - 1 E-35 9,524.96 10,875.00 3,422.55 244.92 3,177.62 Pass -Major Risk 1 E-35 - 1 E-35A - 1 E-35A (wp02) 9,524.96 10,899.96 3,374.65 310.21 3,064.44 Pass -Major Risk Plan 1 E-117 - 1 E-117 - 1 E-117 (wp05) 14,422.54 14,850.00 1,536.00 383.15 1,152.86 Pass -Major Risk Plan 1 E-117 - 1 E-117 L1 - 1 E-117 L1 (wp05) 14,423.24 14,850.00 1,525.95 369.10 1,156.85 Pass -Major Risk Plan 1 E-117 - 1 E-117 L2 - 1 E-117 L2 (wp05) 14,423.24 14,850.00 1,527.33 368.51 1,158.82 Pass -Major Risk Kuparuk 1J Pad Plan 1J-160 (M2) -Plan 1 J-M2 Lat A -Plan 1J-M2 Lat A 15,649.18 7,725.00 1,580.66 238.27 1,342.39 Pass -Major Risk Plan 1J-162 (M1) - 1J-162 - 1J-162 (wp03.1-North Heel 15,643.76 8,899.96 393.51 165.66 227.85 Pass -Major Risk Plan 1J-162 (M1) - 1J-162 L1 - 1J-162 L1 (wp3.1) 15,643.76 8,899.96 393.51 165.56 227.95 Pass- Major Risk Plan 1J-162 (M1) - 1J-162 L2- 1J-162 L2 (wp3.1) 15,643.76 8,899.96 393.51 165.56 227.95 Pass -Major Risk Kuparuk River Unit Non Pad Kup-34-11-10-1 - 34-11-10 - 3411-10 14,800.49 3,650.00 346.09 252.02 94.06 Pass -Major Risk CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 5x1/2005 8:35:43PM Page 2 of 2 COMPASS 2003.11 Build 48 ~I ~ ~~... LJ 1 E-170 L Drilling H • ~ iiTiil (SEE WELL PLAN AND ATTACHMENTS FOR DETAILED DISCUSSION OF THESE RISKS) 8 1/2" Open Hole / 5 1/2" Liner Interval Hazard Risk Level Miti ation Strate Abnormal Reservoir Pressure Low Stripping drills, Shut-in drills, Increased mud wei ht. Stuck Pipe Low Good hole cleaning, PWD Tools, Hole O ener, Decreased mud wei ht Lost Circulation Moderate Reduced um rates, Mud rheolo LCM Hole Swabbing on Trips High Trip speeds, Proper hole filling (use of trip sheets Pum in out 1E-126 Drilling Hazards Summary prepared by Steve Shultz jjj 4/20/2005 11:17 AM ~~~ 'V ...r V ~ ~~ +~~.+.. Q Insulated Conductor no Casing, 20", 94#, K55 x 34", 0.312" WT @ ~~ +/-so'MD ~-, ~. m .ry >- ~r~ro A w a .~. ~ c ~ ~ 0 3 '-' m n ~ r~ 0 13-3/8", 68#, L-80, BTC, R3 @ +/- 5,086' MD / 2, 31 T TV D -~ @ 77 degrees TD 16" hole Top of Ugnu C @ ~ 6,450' MD / 2,627' TVD Lateral Entry Module #2 (LEM), Baker, with seal bore and ZXP packer above. Top of West Sak D @ 9,193' MD /3,243' TVD Wellhead /Tubing Head /Tree, 13-5/8" x 4-'/", 5,000 ksi Tubing String: 4-1/2", 12.6 #, L-80, IBTM (I) 3.875" DB nipple set @ 500' (1)Gas Lift Mandrels, CAMCO 4-1/2"x I" Model KBG-2, one (1) set at <72 deg, one a[ 2400' T V D. ~ __ (I) Sliding Sleeve, with 3.812" nipple, one (1)joi nt above j packer. ~ 105 L2 "D" Sand Window @ +/- 9,193' MD / 3,243' TVD 79 degrees "D" Liner, 5-I/2", 15.5#, L80, BTCM, R3 \\ '/z slotted and % blank (0.125" x 2.5" slots, 32 per foot, 5.9% open area) • ,:. -- - •- , • Lateral Entry Module #1 (LEM), __ -~ 105 LI "B" Sand Window ~~~. Baker, with seal bore and ZXP packer above. +/- 9 523' ~„1~~~-,__.._~_~ 81 degrees "B" Liner, 5-I/2", 15.5#, L80, BTCM, R3 f. • ~ % slotted and''/z blank (0 125" x 2 5" slots Top of West Sak B @ ~ 9,523' MD / 3,305' TVD Tubing, 4-''/z" [BTM, from LEM to A2 Liner, with seal stem and CAMCO 3.562" "DB" nipple. `me o~ s` ~~ ~ M Seal bore and ZXP packer for A2 liner +/_ q0' below "B" window 9-5/8", 40#, L-80, BTCM, R3 Csg @ +/- 10,433' MD / 3,447' T VD @ 81 degrees TD 12-1/4" hole IE-170 Planned: ASP NN) 27lieitings'. 549,889 ASP NAI) 27 NorthinR.s'. 5,959,??9 Pad l~:Ic,~ation. (G.I'AMSI. Doyon Rig 15 Rig Floor (RF) Cad 0' Elevation: 94.1' AMSL I E-170 L2: 8-1/2" D sand lateral TD 15,646' MD / 3,184' T V D IE-170 L1: ~ 8-1/2" "B" sand lateral TD 15,650' MD / 3,258' TVD 32 per foot, 5.9°/ open area) ~ ~ `_ _ ~~ BTCM, R3'/z slotted and'/z blank, constrictors jor isrdcniort I E-170: 8-1/2 A28 A2 s~eral 1 3,431' TVD ~~. . 1L 14 I I S.~ r~ ' ~ I~ I ~~~. t, ~~ ~ ~~ '~ ~` r 1~ lE 08 t 18 1 1E- 1E- 0 ~ f ~; ~- ~ 1E- tE 2 E t ~ ~'1 / 91', ,f / ~ ~ -05 tE-15 3 - ~ =~- . ' 1 E- 8 '`~ 1 ~r ~ - ~ ~~--~ ~ ~ ' . ~ 21 ~~ ` - 1E-18 i r, ~ fi _ _ ~ ~~~~jj '.1; ~~ I ~,', _ \ --~ ~ tE-30 IE~7 ~ ~ ~a ~ ~R 0~ ~ g E-24 ,l IE- tEtB+i O I ' ~ IE J I, 1 ` ~~ tE-02 E-ZB~., 5 t E-04 ~~~ ~ ~ 1 E-31 .. O •" ' ~ It ~ ' - -. - ' - -' ii ` --- ~l • ~--. 1 t 8boo t~t~~ ~-00 1L-28 tE-3R ~ ~ / / , ~~Q ~ i 1.r ~ _ ~ 1 ~~~o t E-35 ~ ~ c IL 2_ 1L-I ' ~ 11~?00 ~'`-~,~ t d °'I` 32 i :~ 12000 ,.... ` 1 L- 204 '~• .-~ -.---- -~ - ~ 13000 t't, Slotted Liner 14°°0 15000 1E-117t„>! ~r t-~ni ~ ~~ :( n 2 f~_t tt0~a , " KRU 1E-170L1 '° '" ~°`~~ ` Proposed 1-Oil ~; _ -,~E_2., ,D-,, ~. `;,,. West Sak .,B.. Sand • \~ ,D;d_~~ ,D_, .. 2050750 _ ~~-- Confidential wells are red ID-12Z • - SFD 5/1012005 _~ 1D-123 10 ~ ; ~- J ; ~. ~' J~ /4D~1 3 ~ ~ ~'~ ,, _ 1D 0 ~~ ---- __ tE-33 --- t0-t 28 1 331 1~ t 9 '4 -136 10-1 tD 1331 1 1 28 !~ ' % ~ 1D-13 f10-12i, 1D-1 J2 n I1D 38 Y,D-t.~t -22 1j-12~ 1D-0' 1D-1 J4 1~-IOSPBI 1' -08 ~t~P-i14~1U \ ~~'•, `~ 2 26 \ ~~~ ' ID- Y I~ 3- ~, IE-J4 1`_=11~66Y I~=t~~~, ggggLLlI 1 J~9 ~d~4Ee~2 T11 N, R10E, UM t , 1}, • 34 35 ~~ _~~,; ~ i r, i ;. ,~,,~;t~r ,.: ;, ~__~.~~ ~ .~,.~r +-- .. Feet 0 2,O~J0 ~,G40 -~- ~~ • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~~~- ~~' ' ~ 7d ~- PTD# Z ~ ~ - ~ ~ ~ CHECK WHAT ADD-ONS "CLUE" APPLIES OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (PH) records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/inject is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, WEST SAK OIL - 490150 Well Name: KUPARUK RIV U WSAK 1 E-170Li Program DEV Well bore seg ~ PTD#:2050750 Company CONOCOPHILLIPS ALASKA INC Initial ClasslType DEV l PEND GeoArea 890 Unit 11160 OnlOff Shore On _ Annular Disposal ^ Administration 1 Pe[mit_fee attached- _ - _ - - - - - - - - - - - - - - - - - - - - - - - NA- _ - 11Ues1 Sak l3 Sand multilateral well segment; fee waived per 20 AAC 25.005(e)_ - 2 Lease number appropriate__-_________________________- ____,____-Yes_- ____Top_productiyeintervaland TD-inADL 025660.__-._-_--____-_--_-_-----_-_--_----_-- 3 Uniquewell_nameandnumber____________________________ __________Yes__ -_-_--_-- ---------------------------------------------------------------- 4 Well locatedin_a-defined_pool__-_-_____-______________ __________ Yes-- _-_-KRUWest_Sak OilPool~governed-by Conservafion_OrderNo,4068-_-__-_-___-_-__-___---_._ 5 Well located proper distance from drilling unit_boundary_ _ - - _ - _ - Yes . - - . -Well is more than-509 feet from an external property Dine- - - - - - - - - - - - - - - 6 Welllocakedproperdistancefromotherwells___________________ ____ _____Yes-_ -___-No[estriCtionsas_to well spacinglnCO.4066._-____-_-_-___-_-_---__--_- 7 Sufficient acreage available in-drilling unit- - - - - - - - - - - - - - - - - - - - - - - - -Yes . - - - - No restrictions as_to well spacing excep_tthat no-pay shall be opened in a wel_I closet - . - - - - . - - - - - - 8 If deviated, is-wellbore plat_ineluded - - - _ - _ - - _ - _ - - - _ _ _ - _ - - - _ Yes - . - - than 50.0 feet fo_an extematproperty line.- - _ - - _ _ - -------------------------------- 9 Operator poly affected party - - - - - - - - -Yes - - - - - - - - - - - - 10 Operator has.appropriate-bondip force----------- -- ------- ------ --Yes-- --- ----------------- -- ---------------- --------------------------- -- 11 Permit_canbei_ssuedwithoutconservationorder_-_-___-.__-__-_ _-_--__--Yes_- -_-.---__- -------------------------------------------------------------- Appr Date 12 Permit_eanbeissuedwjthoutadministrative_approval_-__-_-_____ --___-_-_Yes_ .___-__--------------------------- ------------------------------------- SFD 511012005 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection Or-der. # (put l9# {n_comments)_(For_ NA_ - _ - _ - - - - - - - - - - - - - - - - _ - - . - - _ _ _ - _ - _ .. _ - - . _ - - - - - _ - _ - _ - _ _ _ - _ _ _ _ _ _ _ - - _ - 15 All wells within114_mileareaof[eyiewidentified(Forservicewellonly)------ --------- t`tA_._ .____-_-,-__-_-_,-_-____-_-_-__-_-_-____-_-___--- 16 Pre-produced injector; dur_ation_of pre production less than 3 mor!ths-(For service well only) _ _ NA_ _ - ------------------------------------------------------------------------- 17 ACMP-FindjngofConsistency-hasbeenissued-for-this project--_____-_ __---_--- NA__ ---_-_________________________ - - - - - - - - Engineering 18 Conduclorstring-provided__________________--_____-__ _-__-_---NA-__ -_-_-Conduetorset_inmotherbore,_1E-170205,074),-_______-_-___-___---_- -_-_-- 19 Surface casing.prQtectsall-known-U$DWs-_.___--_._.__.___-_ ___-_-_-NA___ --_-All aquifers exempted, 40 CFR-147.1Q2(b~(3)._-_-_-_______________________--_._-- 20 CMT voi adequate_to circulate-on conductor & surf_csg - - - - - - - - - - - - - - - - - NA- _ _ - - _ Surface casing set in motherbore. - - - _ - _ . - - - _ - - ------------------------------ 21 CMT_vol adeguate_t4 fie-in long string to surf csg_ _ - - - _ - _ _ _ _ - _ _ _ _ _ - _ - _ _ _ - NA_ _ _ - _ _ Long string set i_n motherbore. _ _ _ _ - _ _ - _ _ _ - - - - - - - 22 CMT_willcoverallkpo_wn-productivehorizons_-__-__----__.--___ _.-_____ No--_ __--_Slotte_dlinercompletionplanned_________________________-_-_-_----_-_-_-_-_.-- 23 Casing desyns adequate fo[ C, T, B & permafrost - - - - - -Yes - - - - - - - - - - - - 24 Adequate tankage_or te_serye pit - - - _ . - - - - - - - - - - - - - - - - - -Yes - _ - - Rig is_equipped with steel-pits. _No reserve_pitplanned. All Waste to approved annulus or CI_ass Ilwell. - - - 25 Ifa_re-drill,has.a-1.0-403 far abandonment been approved_____________ _________ NA__- ____--___--___ 26 Adequate wellbore separationproposed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes - - _ _ - - -Proximity analysis perf_o[med, Nearest wellbore-is A lateralti-150' tvd below._ - _ _ _ _ _ _ - _ _ _ _ _ - - _ _ - _ _ - - 27 If diverter required, does it meet regulations _ - - - - - - - - - - - - - - - - - - - - - - - NA_ - _ _ _ BOP stack,will already_be_in place, _ _ _ _ _ - _ - - - - ------------------------------- Appr Date 28 /)tilling fluid- program schematic & equip list adequate - - - - - - - - - - - - - - - Yes _ - - -Maximum expected formatipn pressure 8,6-EMW._ MW glanngd 9.0 ppg in WS. _ _ _ _ - - _ _ _ _ _ _ - _ _ - - _ _ - - TEM 5111/2005 29 BOPEs,_dotheymeetregulation------------------------- ---__ --Yes-- ------.------------------------------------------------------------ 30 BOPE_press rating appropriate; test to_(pu_t psig in comments)- - - - - - - - - - - - -Yes - _ . - - MASP calculated at 1106 psi. 3000_psi_appropriate. CPAI normal tests_to 5p00-psi. _ - - _ _ _ _ _ _ _ _ - 31 Choke-man'rfold complies wtAPI_RP-53 (May 84) - - Yes - - - - - - - - - - - - - - - - 32 Work willoecurwithoutoperationshutdown____________________ ___--_-__Yes_- ___,____________-___-__,_______, ------------------------------------- 33 Is presence. of H2Sgas- probable - . - . - . - - - - - . - . - . - _ - - - - - _ - - _ Yes - - - - - . H2$ has been reported in WS 1 E wet{s, Mud shou{d-preclude H2S on rlg. Rig has sensors and alarms, - _ _ 34 Mechanical conditio0 of wells within AOR verified (FOr_ service well only) - - _ - - _ - - - - NA_ _ _ _ - _ - - - - _ - Geolagy 35 Permit can be issued w!o hydrogen_sulfide measures - - - - - - - - - - - - - - - - - - - No- _ _ - - KRU 1E-Pad West Sak wells measured from 22 to 76 ppm H2S in 2004. Rig_has sensors and alarms._ - - - _ - - 36 Data_presented on potential overpressure zones - - - - - - - - - - - - - - - - - - - - Yes - - _ _ . -Expected r_eservoirpressure is 8,1 - 8,6-ppg EMW; wjll_be drilled with 9.t)ppg Oil-base mud.- - - _ - _ - - - - - - _ Appr Date 37 Seism{canalysisofshall4wgasz9nes___.-_-_-_.--._-___. __. -_-__NA__- ___--___ ------------------------------------- - - SFD 5110/2005 38 Seabed condition survey-(ifoff-shore) - - - _ . _ _ - - _ - _ - - _ _ _ - _ - _ - - tJA_ _ - -- ----------------------- - - - - ---------------------------------- 39 _ Contact namelphonefor weekly progress-repotts [exploratory only)- - - - - - - - - - - - - - NA_ - Geologic Commissioner: Engineering P is Date: Commissioner: Date Co ssione Date • Well History File APPENDIX Information of detailed nature that is not • particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efforl has been made to chronologically organize This category of information. • Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Jan 09 09:07:02 2006 Reel Header Service name .............LISTPE Date .....................06/01/09 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date .....................06/01/09 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. • ~ 345"1 ~p~- ~ ~ ~ Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk River Unit MWD/MAD LOGS WELL NAME: 1E-170 L1 API NUMBER: 500292326460 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 09-JAN-06 JOB DATA MWD RUN 3 MWD RUN 4 MWD RUN 14 JOB NUMBER: MW0003778283 MW0003778283 MW0003778283 LOGGING ENGINEER: B. HENNINGSE B. HENNINGSE P. SMITH OPERATOR WITNESS: G. RIZEK G. RIZEK F. HERBERT MWD RUN 15 MWD RUN 16 JOB NUMBER: MW0003778283 MW0003778283 LOGGING ENGINEER: P. SMITH P. SMITH OPERATOR WITNESS: F. HERBERT F. HERBERT SURFACE LOCATION SECTION: 21 TOWNSHIP: 11N RANGE: l0E FNL: 247 FSL: FEL: 641 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 111.05 GROUND LEVEL: 70,40 WELL CASING RECORD OPEN HOLE CASING DRILLERS • BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 12.250 13.375 5054.0 2ND STRING 8.500 9.625 9778.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 & 2 WERE DIRECTIONAL ONLY - NO DATA ARE PRESENTED. 4. THIS WELLBORE WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 9778' MD/3331'TVD, WITHIN THE RUN 4 INTERVAL OF THE 1E-170 PBl WELLBORE. 5. MWD RUNS 3,4,15,16 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), AND PRESSURE'WHILE-DRILLING (PWD) RUNS 3,4,16 INCLUDED GEO-PILOT ROTARY STEERABLE BHA (GP) MWD RUN 16 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL STABILIZED LITHO-DENSITY (ABED), AND ACOUSTIC CALIPER (ACAL). NO PROGRESS WAS MADE ON RUN 13. SROP DATA ONLY ARE PRESENTED FOR RUN 14. 6. DEPTH SHIFTING OF MWD DATA WAS WAIVED PER E-MAIL, DATED 12/16/04, FROM M. WERNER (CPAI) TO R. KALISH (SDS) MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1-4,14-16 REPRESENT WELL 1E-170 L1 WITH API#: 50-029-23264-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 15756'MD/3234'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP SPACING), TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE LITHOLOGY, ACAL-DERIVED). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE, CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. ACAL = ACOUSTIC CALIPER. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZES: ACAL-DERIVED - 8.5" BIT MUD WEIGHT: 9.0-9.1 PPG MUD SALINITY: 40000-47000 PPM CHLORIDES FORMATION WATER SALINITY: 11000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH FET 5046.5 15710.5 RPX 5046.5 15710.5 RPS 5046.5 15710.5 RPM 5046.5 15710.5 RPD 5046.5 15710.5 GR 5054.0 15718.0 ROP 5090.5 15756.0 NPHI 9960.0 15663.5 FCNT 9960.0 15663.5 NCNT 9960.0 15663.5 CALA 9965.5 15667.0 RHOS 9974.5 15677.0 PEF 9974.5 15677.0 DRHO 9974.5 15677.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD BIT RUN NO MERGE TOP 3 5046.5 4 9108.0 14 9778.5 15 9820.0 16 10050.0 REMARKS: MERGED MAIN PAS5. MERGE BASE 9108.0 9778.0 9820.0 10050.0 15756.0 Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............Undefined ! ~ Frame Spacing .. ........... .. ......60 .lIN Max frames per record ..... .. ......Undefined Absent value ... ........... .. ......-999 Depth Units .... ........... .. ...... Datum Specifica tion Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 GALA MWD INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5046.5 15756 10401.3 21420 5046.5 15756 ROP MWD FT/H 0.22 2345.03 208.367 21332 5090.5 15756 GR MWD API 24.43 138.57 66.187 21329 5054 15718 RPX MWD OHMM 2.1 2000 36.8652 21329 5046.5 15710.5 RPS MWD OHMM 3.85 2000 40.4439 21329 5046.5 15710.5 RPM MWD OHMM 4.28 1835.59 43.9984 21329 5046.5 15710.5 RPD MWD OHMM 4.26 2000 41.4083 21329 5046.5 15710.5 FET MWD HOUR 0.06 796.11 2.4622 21329 5046.5 15710.5 NPHI MWD PU-S 8.58 49.11 36.8782 11408 9960 15663.5 FCNT MWD CNTS 676.86 4382.1 1091.64 11408 9960 15663.5 NCNT MWD CNTS 115782 201358 136097 11408 9960 15663.5 RHOB MWD G/CM 1.989 2.707 2.20619 11406 9974.5 15677 DRHO MWD G/CM -0.17 0.21 0.03625 11406 9974.5 15677 PEF MWD BARN 0.92 6.45 2.03888 11406 9974.5 15677 CALA MWD INCH 8.37 11.09 8.86186 11404 9965.5 15667 First Reading For Entire File..........5046.5 Last Reading For Entire File...........15756 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 5046.5 9064.0 RPX 5046.5 9064.0 RPM 5046.5 9064.0 RPD 5046.5 9064.0 FET 5046.5 9064.0 GR 5054.0 9071.5 ROP 5090.5 9108.0 LOG HEADER DATA DATE LOGGED: 06-JUL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9108.0 TOP LOG INTERVAL (FT) 5090.0 BOTTOM LOG INTERVAL (FT) 9108.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 74.2 MAXIMUM ANGLE: 82.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 124724 EWR4 ELECTROMAG. RESIS. 4 59672 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 12.250 DRILLER'S CASING DEPTH (FT) 5054.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.10 MUD VISCOSITY (S) 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 1000 FLUID LOSS (C3): 4.5 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 7.500 65.0 MUD AT MAX CIRCULATING TERMPERATURE: 5.380 93.2 MUD FILTRATE AT MT: 5.000 65.0 MUD CAKE AT MT: 2.300 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: • Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5046.5 9108 7077.25 8124 5046.5 9108 ROP MWD030 FT/H 1.06 2345.03 329.886 8036 5090.5 9108 GR MWD030 API 24.43 138.57 65.8909 8036 5054 9071.5 RPX MWD030 OHMM 2.1 84.28 14.8458 8036 5046.5 9064 RPS MWD030 OHMM 4.74 2000 17.3313 8036 5046.5 9064 RPM MWD030 OHMM 5.09 1835.59 18.6538 8036 5046.5 9064 RPD MWD030 OHMM 5.01 2000 20.1687 8036 5046.5 9064 FET MWD030 HOUR 0.06 122.75 1.70767 8036 5046.5 9064 First Reading For Entire File..........5046.5 Last Reading For Entire File...........9108 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06fO1f09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 9064.5 9778.0 FET 9064.5 9778.0 RPD 9064.5 9778.0 RPM 9064.5 9778.0 RPS 9064.5 9778.0 GR 9072.0 9778.0 ROP 9108.5 9778.0 LOG HEADER DATA DATE LOGGED: 13-JLTL-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9778.0 TOP LOG INTERVAL (FT) 9108.0 BOTTOM LOG INTERVAL (FT) 9778.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 77.7 MAXIMUM ANGLE: 81.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 124725 EWR4 ELECTROMAG. RESIS. 4 116184 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 12.250 DRILLER'S CASING DEPTH (FT) 5054.0 • BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G) 9.30 MUD VISCOSITY (S) 65.0 MUD PH: 8.5 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3}: 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) 2.500 67.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.490 116.6 MUD FILTRATE AT MT: 1.950 67.0 MUD CAKE AT MT: 1.980 67.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined • Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9064.5 9778 9421.25 1428 9064.5 9778 ROP MWD040 FT/H 0.64 483.99 214.852 1340 9108.5 9778 GR MWD040 API 47.08 119.21 86.7624 1413 9072 9778 RPX MWD040 OHMM 3.15 54.57 13.6253 1428 9064.5 9778 RPS MWD040 OHMM 3.85 102.95 18.6324 1428 9064.5 9778 RPM MWD040 OHMM 4.28 110.32 20.8208 1428 9064.5 9778 RPD MWD040 OHMM 4.87 155.58 25.4902 1428 9064.5 9778 FET MWD040 HOUR 0.11 153.21 10.4176 1428 9064.5 9778 First Reading For Entire File..........9064.5 Last Reading For Entire File...........9778 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/O1/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 9778.5 9820.0 • LO G HEADER DATA DATE LOGGED: 14-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 9820.0 TOP LOG INTERVAL t(FT) 9778.0 BOTTOM LOG INTERVAL (FT) 9820.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 8.000 DRILLER'S CASING DEPTH (FT) 9778.0 BOREHOLE CONDITIONS MUD TYPE: Oil Based MUD DENSITY (LB/G) 9.10 MUD VISCOSITY (S) 23.0 MUD PH: .0 MUD CHLORIDES (PPM): 47000 FLUID LOSS (C3) 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 123.8 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD140 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9778.5 9820 9799.25 84 9778.5 9820 ROP MWD140 FT/H 0.22 47.75 7.02583 84 • 778.5 First Reading For Entire File..........9778.5 Last Reading For Entire File...........9820 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9778.5 10000.5 GR 9778.5 10008.0 RPX 9778.5 10000.5 RPS 9778.5 10000.5 RPD 9778.5 10000.5 RPM 9778.5 10000.5 ROP 9820.5 10050.0 LOG HEADER DATA DATE LOGGED: 15-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10050.0 TOP LOG INTERVAL (FT}; 9820.0 BOTTOM LOG INTERVAL (FT) 10050.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.4 MAXIMUM ANGLE: 91.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 132482 EWR4 ELECTROMAG. RESIS. 4 157645 9820 • BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 8.500 DRILLER'S CASING DEPTH (FT) 9778.0 BOREHOLE CONDITIONS MUD TYPE: Oil Based MUD DENSITY (LB/G) 9.10 MUD VISCOSITY (S) 82.0 MUD PH: .0 MUD CHLORIDES (PPM): 47000 FLUID LOSS (C3) 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 113.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD150 FT/H 4 1 68 4 2 GR MWD150 API 4 1 68 8 3 RPX MWD150 OHMM 4 1 68 12 4 RPS MWD150 OHMM 4 1 68 16 5 RPM MWD150 OHMM 4 1 68 20 6 RPD MWD150 OHMM 4 1 68 24 7 FET MWD150 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9778.5 10050 9914.25 544 9778.5 10050 ROP MWD150 FT/H 1.73 312.59 133.395 460 9820.5 10050 GR MWD150 API 32.42 82.73 58.7405 460 9778.5 10008 RPX MWD150 OHMM 21.42 2000 152.29 445 9778.5 10000.5 RPS MWD150 OHMM 22.79 2000 93.0685 445 9778.5 10000.5 RPM MWD150 OHMM 18.52 999.23 73.57 445 9778.5 10000.5 RPD MWD150 OHMM 4.26 2000 81.3395 445 9778.5 10000,5 FET MWD150 HOUR 0.4 796.11 23.0595 445 9778.5 10000.5 First Reading For Entire File..........9778.5 Last Reading For Entire File...........10050 n File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD • Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 16 DEPTH INCREMENT: .5000 FILE SU1`~MARY VENDOR TOOL CODE START DEPTH STOP DEPTH FCNT 9960.0 15663.5 NCNT 9960.0 15663.5 NPHI 9960.0 15663.5 CALA 9965.5 15667.0 RHOB 9974.5 15677.0 DRHO 9974.5 15677.0 PEF 9974.5 15677.0 RPX 10001.0 15710.5 RPS 10001.0 15710.5 RPM 10001.0 15710.5 RPD 10001.0 15710.5 FET 10001.0 15710.5 GR 10008.5 15718.0 ROP 10050.5 15756.0 LOG HEADER DATA DATE LOGGED: 21-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 66.37 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 15756.0 TOP LOG INTERVAL (FT): 10050.0 BOTTOM LOG INTERVAL (FT) 15756.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 88.5 MAXIMUM ANGLE: 94.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 163686 EWR4 ELECTROMAG. RESIS. 4 134760 CTN COMP THERMAL NEUTRON 179954 ALD Azimuth. Litho-Den 10640599 i ~ ACAL Acoustic Caliper 727424 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 8.500 DRILLER'S CASING DEPTH (FT) 9776.0 BOREHOLE CONDITIONS MUD TYPE: Oil Based MUD DENSITY (LB/G) 9.00 MUD VISCOSITY (S): 88.0 MUD PH: .0 MUD CHLORIDES (PPM): 47000 FLUID LOSS (C3) .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 149.0 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD160 FT/H 4 1 68 4 2 GR MWD160 API 4 1 68 8 3 RPX MWD160 OHMM 4 1 68 12 4 RPS MWD160 OHMM 4 1 68 16 5 RPM MWD160 OHMM 4 1 68 20 6 RPD MWD160 OHMM 4 1 6S 24 7 FET MWD160 HOUR 4 1 68 28 8 NPHI MWD160 PU-S 4 1 6S 32 9 FCNT MWD160 CNTS 4 1 68 36 10 NCNT MWD160 CNTS 4 1 68 40 11 RHOB MWD160 G/CM 4 1 68 44 12 DRHO MWD160 G/CM 4 1 68 48 13 PEF MWD160 BARN 4 1 68 52 14 CALA MWD160 INCH 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9960 15756 12858 11593 9960 15756 ROP MWD160 FT/H 1.55 3 74.35 126.539 11412 10050.5 15756 GR MWD160 APT 38 96.01 64.1495 11420 10008.5 15718 RPX MWD160 OHMM 8.95 6 69.87 50.768 11420 10001 15710.5 L J RPS MWD160 OHMM 9.29 2000 57.3845 11420 RPM MWD160 OHMM 9.4 1809.23 63.5787 11420 RPD MWD160 OHMM 10.04 2000 56.7886 11420 FET MWD160 HOUR 0.24 18.39 1.19575 11420 NPHI MWD160 PU-S 8.58 49.11 36.8782 11408 FCNT MWD160 CNTS 676.86 4382.1 1091.64 11408 NCNT MWD160 CNTS 115782 201358 136097 11408 RHOB MWD160 G/CM 1.989 2.707 2.20619 11406 DRHO MWD160 G/CM -0.17 0.21 0.03625 11406 PEF MWD160 BARN 0.92 6.45 2.03858 11406 CALA MWD160 INCH 8.37 11.09 8.86186 11404 First Reading For Entire File..........9960 Last Reading For Entire File...........15756 File Trailer Service name .............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/09 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/01/09 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library Reel Trailer Service name .............LISTPE Date .....................06/01/09 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Physical EOF Physical EOF Writing Library 10001 15710.5 10001 15710,5 10001 15710.5 10001 15710.5 9960 15663.5 9960 15663.5 9960 15663.5 9974.5 15677 9974.5 15677 9974.5 15677 9965.5 15667 Scientific Technical Services Scientific Technical Services End Of LIS File