Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout205-124• Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~.~s- 1 0~, ~- Well History File Identifier Organizing (done> o,wosced iuuiuiiumuu Re,~a~~e~ea iiuiuiuiuiuu RESCAN ~olor Items: ~Greyscale Items: ^ Poor Quality Originals: ^ Other: DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: NOTES: BY: Maria Date: ~ ^ Other:: /s/ '~ Project Proofing II I II ~) II I I III I I III BY: Maria Date: ~ ~ /s/ Scanning Preparation ~ x 30 = ~~ + ~ 0 =TOTAL PAGES (Count does not include cover sheet) BY: Maria Date: I ~,~ 610 / /s/ Y Y ~ Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: _~YES NO BY: Maria Date: ~ ~-.~ ~ / V r] /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found/: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III II it II I II II I I III ReScanned III II~IIIIIII) VIII BY: Maria Date: /s/ Comments about this file: Quality Checked II I II'l II III II') II 10/6/2005 Well History File Cover Page.doc i STATE OF ALASKA ALASKA OIRND GAS CONSERVATION COMMISS ON WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/25/2010 205 -124 310 - 373 3. Address: 6. Date Spudded: 13. API Number. P.O. Box 196612, Anchorage, Alaska 99519 - 6612 8/27/2005 50- 029 - 21659 -01 -00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number. Surface: 8/30/2005 PBU F -27A 2249' FSL, 2195' FEL, SEC. 02, T11 N, R13E, UM 8. KB (ft above MSL): 67 15. Field / Pool(s): Top of Productive Horizon: 4459' FSL, 1509' FWL, SEC. 01, T11 N, R13E, UM GL (ft above MSL): 36.46' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 3228' FSL, 2139' FWL, SEC. 01, T11N, R13E, UM 10571' 9053' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 652650 y 5973783 Zone ASP4 12415' 9037' ADL 028280 TPI: x- 656306 y- 5976069 Zone- ASP4 11. SSSV Depth (MD+TVD): 17. Land Use Permit: Total Depth: x- 656962 y- 5974851 Zone- ASP4 N/A 18. Directional Survey: 0 Yes IN No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilULateral Top Window MD+TVD: MWD / EWR / SGRD / SGRC / SROP, MGR / CCL / CNL 10419' 8985' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu vds Concrete 13 -3/8" i 72# L -80 Surface 2696' Surface 2696' 17 -1/2" 3351 cu ft Arcticset III.465 cu ft AS II 9-5/8" 47# L -80 Surface 9736' Surface 8453' 12 -1/4" 575 cu ft Class 'G' 7" 26# L -80 9491' 10419' 8255' 8982' 8 -1/2" 327 cu ft Class 'G' 3-1/2' x 33/18" x 2 -718" 8.81* / 6 211 / 8.18M L -80 9491' 12415' 8255' 9034' 4-1/8" 185 cu ft Class 'G' 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): None 4 -1/2', 12.6#, L -80 9539' 9434' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. whtt F EB o 7 2.111 DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED 10571' Set Whipstock ( A C km. r WS 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes : No Sidewall Core(s) Acquired? ❑ Yes IN No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and W • % I sa er 20 AAC 250.071. rM;Zke None d N 3 1 2011 DMS J g I ' i' fithriea Crif 8,. Gas Cons- Commission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only 7 e,.., z•z n in : W/i G .29. GEOLOGIC MARKERS (List all formations and ma ncountered): 30. •MATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Zone 1B 10457' 9011' None TDF / Zone 1A 10517' 9040' TDF / Zone 1A 11896' 9042' Formation at Total Depth (Name): 31. List of Attachments: Well Work Summary, Summary of Daily Drilling Reports and a Well Schematic Diagram. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra Sttewman Title: Drilling Technologist Date: vl 1 PBU F - 27A 205 - 124 310 - 373 Prepared By Name/Number. Sondra Stewman, 564 -4750 Well Number Permit No. / Approval No. Drilling Engineer: Amanda Rebol, 564 -5543 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water- Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE = 6" McEV OY • SAFETY NIBS: WELL ANGLE > 70° @ 10524' WELLHEAD = M cEVOY F 27B ACTUATOR = OTIS KB. ELEV = 67.9' PJC DRAFT BF. ELEV = 38.41' I 2087' I- I4 -1/2" OTIS SSSV NIP, ID = 3.813" I KOP = 10414' 4 8,i 1 Max Angle = 94.5 @ 11256' GAS LIFT MANDRELS Datum MD = 10265' ST1 MD 1 ND DEV TYPE VLV LATCH PORT DATE Datum TV = 8800' SS q 7 2985 2984 6 OTIS DMY RM ' 0 09/23/10 113 -3/8" CSG, 68 #, L -80, ID = 12.415" H -.269*- L 6 5058 4796 39 OTIS DMY RM r 0 09/23/10 5 6575 5956 41 OTIS DMY RA r 0 09/23/10 4 7511 6680 38 OTIS DMY RA r 0 09/23/10 3 8094 7136 39 OTIS DMY RA r 0 09/23/10 Minimum ID = 2.25" 10394' 2 8714 7625 37 OTIS DMY RA 0 09/23/10 1 9215 8035 34 OTIS DMY RA 0 09/23/10 2.70" DEPLOYMENT SLEEVE 9 - -I4 -1/2" OTIS XA SLIDING SLEEVE I I 9419' I — TIW SBR TBG SEAL ASSY I 1Z� ■■ 1 9434' H9-5/8" X 4-1/2" TIW HBBP PKR, ID = 4.75" I 1 9475' I---I4 -1/2" OTIS X NIP, ID = 3.813" I TOP OF 7" LNR H 9490' I I 9491' H3-1/2" BOT DEPLOY SLEEVE, ID = 3.00" I 9508' I — 4 -1/2" OTIS XN NIP, MILLED (08/21/05) ID = 3.80" (BEHIND PIPE) 1 I 9510' I - 1 /2 " HOWCOX NIP, ID= 2.813" I 14 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" I 9539' 13 -1/2" LNR, 8.81 #, L -80 STL, .0087 bpf, ID = 2.990" 1-1 9543' I N 1 9539' I--14 -1/2" BAKER SOS TBG TAIL I BEHIND c\ -134) I 9544 ( — I ELMD TT LOGGED 11/06/86 I CT LNR I' 9 -5/8" CSG, 47 #, L -80, ID = 8.681" I—L 9732V I • 9543' H 3 -1/2" X 3 -3/16" XO, ID = 2.867" I 'ESTIMATED TOP OF CEMENT H ` 10300' • 1 10192' 1--I MA RKER JOINT I 17" x 4 -1/2" MECHANICAL WS (08/19/05) H 10414' 17" LNR, 26 #, L -80, U4S, .0383 bpf, ID = 6.276" I — 10426 ∎ :*: ► w,4 ∎••i MILLOUT WINDOW (F -274) 10419' - 10426' I TOP OF 2 -3/8" LNR 1-1 10394' 1 10394' H2.70" DEPLOY SLEEVE, ID = 2.25" I I 13-3/16" WHIPSTOCK (12/23/10) H 10571' 1 t MILLOUT WINDOW (F -27B) 10571' - 10576' 13-3/16" LNR, 6.2 #, L -80 TCII, .0076 bpf, ID = 2.80" 1-1 10600' (\ ` No PERFORATION SUMMARY ' ` ` ` REF LOG: MWD GR LOG 08/30/05 . " ANGLE AT TOP PERF: 41° @ 10401' . . Note: Refer to Production DB for historical pert data . .. . ` SIZE SPF INTERVAL Opn /Sqz DATE . ` • \ 2 -3/8" SLTD 10401 - 12227 SLOT 12/30/10 • I2 -3/8" SLTD LNR, 4.4 #, L -80 STL. .0039 bpf, ID = 1.992" I 12227' , DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/31/86 N22E ORIGINAL COMPLETION WELL: F -27B 09/02/05 NORDIC 1 CTD PERIM No: 210610 12/31/10 NORDIC 1 CTD SIDETRACK (F -27B) API No: 50- 029 - 21659 -02 01/12/11 PJC DRLG DRAFT CORRECTIONS SEC 2, T11N, R13E, 2249' FSL & 2195' FEL 01/13/11 AK/PJC FINAL DRLG CORRECTIONS BP Exploration (Alaska) • • F -27A, Well History (Pre Rig Sidetrack) Date Summary 09/17/10 T /I /O= SI /1000/0 PPPOT -T (PASS) (Pre CTD) PPPOT -T : Opened SBS unable to bleed THA void to 0 psi, torqued LDS "Standard" void bled to 0 +. Removed 1" NPT plug, Installed Alemite RU 1 HP BT flushed void until clean returns achieved, tested for 5 minutes, no pressure loss. Bled through SBS, removed Alemite removed internal check, installed Alemite fitting. Pressure void to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. RD test equipment. * ** Internal check removed on Tubing * ** 09/18/10 ** *WELL SHUT IN ON ARRIVAL * ** LEAK TIGHT ISOLATION TEST FAILED,VALVE CREW WILL WORK ON IT. * ** LEFT WELL SHUT IN,TURNED WELL OVER TO PAD OPER. * * ** 09/22/10 ** *WELL S/I ON ARRIVAL * * *(ctd screen) DRIFT W/ 2.25" CENT TO DEVIATION AT 10,570' SLM. (no sample) RUN PDS 24 ARM CALIPER FROM 10,570' SLM TO 9,300' SLM. (good data) DRIFT W/ 3.50" CENT TO DEP SLV @ 9,467' SLM/ 9,491' MD. RUN PDS 40 ARM CALIPER FROM 9,467' SLM TO SURFACE. (good data) SET 4 1/2" SS CATCHER SUB @ 5,107' SLM. * ** *JOB STILL IN PROGRESS, WSR CONTINUED ON 9/23/2010 * * ** 09/23/10 ** *WSR CONTINUED FROM 9/22/2010 * ** PULLED OGLV FROM STA# 6 @ 5040' SLM/ 5058' MD & LGLV FROM STA #6 @ 2967' SLM/ 2985' MD SET DGLV IN STA# 7 @ 2985' MD, LRS LOADED IA W/ 325 BBLS OF CRUDE SET DGLV IN STA# 6 @ 5058' MD, LRS PERFORMED PASSING MIT IA PULLED SLIP STOP CATCHER SUB FROM 5,107' SLM. MADE DRIFT RUN W/ 3 1/2" BRUSH, 4 PRONG, 10 BARB WIRE GRAB TO 9,470' SLM/ 9,491' MD. * ** *LEFT WELL SHUT -IN ON DEPARTURE, SSV LEFT OPEN AND NORMALED UP TO PANEL * * ** 09/23/10 T /I /0= 2200/2250/20 Temp =SI Assist slick -line with MIT IA PASSED to 3000 psi/ MIT OA Failed to 2000 psi (CTD screening) Loaded IA with 5 bbls neat methanol and 325 bbls crude. Slick -line set DGLV. Pumped 6 bbls of crude into IA to 3000 psi. IA lost 80 psi. in first 15 minutes and 40 psi. in second 15 minutes. For a total of 120 psi. in 30 minutes. Bled back -5 bbls. Pumped 4.5 bbls crude on five test. Last test OA lost 20 psi in 15 minutes and 20 psi every 15 minutes after. Called PE and called testa fail. Bled pressure down. FWHP's= 1850/480/0 Slick -line on well at departure 11/30/10 CT -9 1 3/4" CT Scope of Work: PreRig Whipstock Drift. MOL, RU. Weekly BOP test. RIH with BTT 2.625" OD dummy whp -stk drift to tag @ 10589' CTM. POH. FP wellbore to 2500'. Begin RD 12/01/10 CTU #9 w/ 1.75" CT Scope: Dummy WS drift for CTD Finish RD tools. LWSI. RDMO to 15 -21 12/06/10 T /I /0=SSV /10/5. Temp =Sl. WHPs IA & OA FL (pre -rig). No AL. IA & OA FL @ surface. SV,WV,SSV = closed. MV =open. IA,OA =open to gauge. NOVP. 12/10/10 Visual inspection of F -27. Remediation needed on 4 studs on the THA x TS. Notified PE for a plan forward * ** IN PROGRESS " ** 12/11/10 T /I /O = 0/50/0, Torque tree to specs excluding THA x Master ( see log) pressure tested down on swab low 300 psi / PASS, high 3500 psi / PASS , see charted graph in TRP folder 12/14/10 T /I /0= 0 +/0 +/0 +. Temp= SI. WHPs (Pre- CTD). No welhouse, flowline, or AL line. Drilling scaffolding in place. SV, WV, MV= Closed. SSV= Open. IA, OA= OTG. NOVP. 12/17/10 T /I /0= 0/0/0 Pressure tested lubricator to 250 psi /low (passed) -3500 psi /high (passed); Set 6" CIW TWC #417 @ 108" w/1 -2' ext; Shell tested entire tree to 5000 psi (charted) from TWC up (passed); Torqued THA x MN stud bolts w /hammer wrench w /no movement, (hi torque would'nt fit do to Mcevoy body); P.T. tree cap to 500 psi (passed); Pre Nordic 1 Page 1 of 1 xtpi . � r, .� ty z. aYic + ; sac h Ma Common Well Name: F -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/8/2010 End Date: X3- 00Y25 -C (1,205,177.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum: 28 : 27 10/13/1986 00:00 ©67.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/21/2010 06:00 - 09:30 3.50 MOB P PRE RIG RELEASED FROM E -05B AT 06:00. PREP TO MOVE RIG OFF WELL. 09:30 - 10:00 0.50 MOB P PRE PJSM TO MOVE RIG OFF WELL. 10:00 - 15:00 5.00 MOB P PRE MOVE RIG FROM E -PAD TO F -PAD. 15:00 - 16:30 1.50 MOB P PRE PREP F -27 TO MOVE RIG OVER WELL. 16:30 - 18:00 1.50 MOB P PRE MOVE RIG OVER WELL. 18:00 - 23:30 5.50 BOPSUR P PRE RIG ACCEPT 18:00. AOGCC WITNESS WAIVED BY JEFF JONES. PJSM, NU BOP'S AND FUNCTION TEST. 23:30 - 00:00 0.50 BOPSUR P PRE BOP TEST. 12/22/2010 00:00 - 09:30 9.50 BOPSUR P PRE TEST BOPE. PASS. AOGCC WITNESS WAIVED BY JEFF JONES. 09:30 - 11:45 2.25 BOPSUR P PRE TEST TREE VALVES (INCLUDING SSV). TEST AGAINST TWC TO CONFRIM PRESSURE INTEGRITY OF LOWER FLANGE FACE OF MV. CHART TESTS. ALL PASS. 11:45 - 13:30 1.75 BOPSUR P PRE PRE -SPUD MEETING W/ CREW. REVIEW HIGH GOR SOP. 13:30 - 15:00 1.50 BOPSUR P PRE PRESSURE TEST PUMP #1 OUTLET MANIFOLD 15:00 - 16:30 1.50 BOPSUR P PRE DISPLACE DIESEL FROM CT. TEST INNER REEL VLAVE AND PACKOFF AND CHART TESTS AS PART OF BOPE TEST. 16:30 - 18:50 2.33 RIGU P WEXIT PUMP SLACK BACK INTO CT. CUT COIL (CUT 300' CT). 18:50 - 21:30 2.67 RIGU P WEXIT INSTALL CTC LEAKS, INSTALL ANOTHER ONE. PULL TEST TO 30K AND PT 3500 PSI. INSTALL UQC. 21:30 - 22:00 0.50 RIGU P WEXIT MEG E -LINE IN COIL. CHANGE TOP AND BOTTOM HIGH PRESSURE FILTERS IN REEL HOUSE. 22:00 - 22:45 0.75 RIGU P WEXIT UQC DUAL FLAPPER CHECK VALVES PRESSURE TESTED AND CHARTED. PT BOTTOM HIGH PRESSURE FILTER IN REEL HOUSE. 22:45 - 23:30 0.75 RIGU P WEXIT STAB ON WELL AND PUMP SLACK FORWARD 1.5 BPM FOR 36 BBLS. 23:30 - 00:00 0.50 RIGU P WEXIT BRING BAKER WS TOOLS TO FLOOR TO WARM UP. MARKED OFF RADIO ACTIVE AREA AROUND WS. 12/23/2010 00:00 - 00:30 0.50 STWHIP P WEXIT PJSM TO TEST LUBRICATOR. 00:30 - 04:30 4.00 STWHIP N SFAL WEXIT TEST LUBRICATOR 250 LOW/ 3500 HIGH AND CHARTED. SSV WILL NOT OPEN. HOOKED UP HEATER TO VALVE. FILLED TREE WITH METHONAL. Printed 1/28/2011 1:52:01PM ` � r 3 k .,�' ° fi t a 4ue -1s 4 r=, Orni.:11ANFir#74YlinTA0410A-C.:-,4zAA:c Common Well Name: F -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/8/2010 End Date: X3- 00Y25 -C (1,205,177.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum: 28 : 27 10/13/1986 00:00 @67.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 STWHIP N SFAL WEXIT VALVE CREW ON LOCATION TO TROUBLESHOOT SSV. SHIFT CHANGE. VALVE CREW DETERMINES THAT THE SSV BONNET IS LIKELY MISALIGNED, NOT ALLOWING IT TO MAKE PROPER CONTACT W/ THE STEM (ATTACHED TO THE GATE) TO OPEN THE VALVE. VALVE CREW PROPERLY ALIGNS THE BONNET. SSV FUNCTIONS FREELY. 06:00 - 07:30 1.50 STWHIP P WEXIT EAI IAI I7F AND PULL TWC. SIWHP = 0 PSI. RECOVER TWC. LD VALVE CREW LUBRICATOR. 07:30 - 09:15 1.75 STWHIP P WEXIT FREEZE PROTECT EXPOSED CT IN PREPARATION FOR DOUBLE PUMP KILL. PT UPPER HIGH PRESSURE FILTER. 09:15 - 09:45 0.50 STWHIP P WEXIT PJSM PRIOR TO KILL OPERATIONS. CONFIRM THAT HAND MANUALLY CONFIRMED THAT IA AND OA GAUGES AND TRANSDUCERS ARE OPEN TO THEIR RESPECTIVE ANNULI. FORMULATE PLAN AND STAGE EQUIPMENT FOR CONTINGENCY ANNULAR BLEED OPERATIONS. ASSIGN HAND TO CONFIRM ANNULAR PRESSURES W/ READINGS FROM HARD GAUGES IN CELLAR DURING KILL. 09:45 - 12:00 2.25 STWHIP P WEXIT WHP = 0 PSI. IAP = 0 PSI (CONFIRMED W/ MANUAL GAUGE IN CELLAR). OAP = 0 PSI (CONFIRMED W/ MANUAL GAUGE IN CELLAR). PUMP 5 BBLS NEAT METH SPEAR DOWN WELLBORE, BULLHEADING W/ NO RETURNS. SWAP TO KCL. ONLINE W/ 2% KCL BULLHEADING DOWN TUBING W/ NO RETURNS. INITIAL RATE IS -4.75 BPM AT 0 PSI WHP. AFTER -35 BBLS AWAY, BEGIN TO GET POSITIVE WHP (4.75 BPM AT 150 PSI). 50 BBLS AWAY: 4.9 BPM AT 205 PSI. IAP = OAP = 0 PSI. 70 BBLS AWAY: 4.9 BPM AT 245 PSI. 90 BBLS AWAY: 4.9 BPM AT 295 PSI. IAP = OAP =OPSI. 110 BBLS AWAY: 4.9 BPM AT 295 PSI. 140 BBLS AWAY: 4.8 BPM AT 240 PSI. IAP = OAP = 0 PSI. 160 BBLS AWAY: 4.9 BPM AT 340 PSI. IAP = OAP = 0 PSI. 175 BBLS AWAY: 5 BPM AT 420 PSI. 190 BBLS AWAY: 5 BPM AT 490 PSI. IAP = OAP = 0 PSI. 215 BBLS AWAY: 5 BPM AT 500 PSI. 240 BBLS AWAY: 5 BPM AT 510 PSI. 250 BBLS AWAY: FINAL RATE 5 BPM AT 510 PSI. DOWN ON PUMP. PRESSURE IMMEDIATELY FALLS, WELL GOES ON VAC. STATIC LOSS RATE IS STABLE AT -2.3 BPM. 12:00 - 14:00 2.00 STWHIP P WEXIT CALL TOWN REGARDING HIGH STATIC LOSS RATE. AGREE TO SWAP WELL TO MUD. MUD HAS ALREADY BEEN LOADED - CALL FOR MUD TO BE DELIVERED FROM DEADHORSE YARD. KEEP HOLE FULL UNTIL MUD ARRIVES. Printed 1/28/2011 1:52:01PM '- L ", rf j�''�3 ®e a. 47,41'44 is ® tiet1 Utiiiija Att N ' .ors„ _? Common Well Name: F -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/8/2010 End Date: X3- 00Y25 -C (1,205,177.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum: 28 : 27 10/13/1986 00:00 @67.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:00 - 15:10 1.17 STWHIP P WEXIT MUD ON LOCATION (520 BBLS TOTAL, 405 BBLS OF WHICH IS USED). ONLINE W/ MUD DOWN TUBING W/ NO RETURNS TO BULLHEAD DISPLACE WELL TO MUD. SPEAR IN W/ 20 BBLS HIGH VIS MUD ( -100K LSRV) FOLLOWED BY REGULAR MUD. 35 BBLS AWAY: 4 BPM AT 450 PSI. 50''BBLS AWAY: 4 BPM AT 575 PSI. 115 BBLSAWAY: 4 BPM AT 830 PSI. IAP: 0 PSI. OAP: 50 PSI. 135 BBLS AWAY: 4 BPM AT 1350 PSI. 160 BBLS AWAY: 4 BPM AT -1500 PSI FINAL PRESSURE. DOWN ON PUMP. SURFACE PRESSURE SLOWLY DISSIPATES (DOES NOT IMMEDIATELY FALL TO ZERO). 15:10 - 16:30 1.33 STWHIP P WEXIT FLOWCHECK FOR 30 MINUTES - PASS. FILL -UP WELL W/ -3.5 BBLS AFTER FLOW CHECK. 16:30 - 17:00 0.50 STWHIP P WEXIT PJSM TO MUMS BHA. 17:00 - 17:30 0.50 STWHIP P WEXIT MU WS BHA. 17:30 - 17:50 0.33 STWHIP P WEXIT. STAB INJECTOR ONTO WELL. 17:50 - 20:45 2.92 STWHIP P WEXIT .RIH. PVT 271 BBLS, IA 0 PSI, OA 75 PSI, EDC <OPEN PUMPING .3BPM 20:45 - 21:30 0.75 STWHIP P WEXIT GR TIE IN 9730' TO 9806' CORRECTION -8'. 21:30 - 23:00 1.50 STWHIP P WEXIT RIH TO 10,580' UP WT 32K, DOWN WT 19K. LOG CCL 10,580' TO 10,430'. PU TO NEUTRAL WT 26K, CLOSE EDC. 23:00 - 00:00 1.00 STWHIP P WEXIT SET WS TOP AT 10,571'. PRESSURE UP TO 3600 P51 TO SHEAR. SET DOWN 5K. 12/24/2010 00:00 - 00:40 0.67 STWHIP P WEXIT LOG CCL ACCROSS JEWERLY UP TO 9400'. 00:40 - 02:30 1.83 STWHIP P WEXIT POH WITH WS SETTING BHA. 02:30 - 02:45 0.25 STWHIP P WEXIT PJSM TO LD WS SETTING BHA. 02:45 - 03:00 0.25 STWHIP P WEXIT LD WS SETTING BHA. 03:00 - 04:15 1.25 STWHIP P WEXIT TEST PACKER 250 LOW/ 2400 PSI HIGH FOR 30 MIN. CHARTED. 04:15 - 04:30 0.25 STWHIP P WEXIT PJSM TO MU MILLING BHA. 04:30 - 06:15 1.75 STWHIP P WEXIT MU WINDOW MILLING BHA. MILL AND STRING MILL 2.74 GO 2.73 NOGO. BEGIN RIH W/ SAME CIRCULATING W/ FULL RETURNS. 06:15 - 09:00 2.75 STWHIP P WEXIT SHIFT CHANGE. RIH W/ MILLING ASSEMBLY CIRCULATING W/ FULL RETURNS. LOG TIE -IN, CORRECTION OF ( -6'). DRY TAG TOWS AT 10571.5' MD, RIH WEIGHT 20K LB. STACK 2K LB ON WS. 09:00 - 11:30 2.50 STWHIP P WEXIT BEGIN MILL WINDOW. FS 3350 PSI AT 1.5 BPM. ENGAGE AND SEE MOTOR WORK AT TOWS AT 10571.1' MD, MILLING WINDOW AT 3400 PSI W/ 600 LB DHWOB. 10:00 - MILLING WINDOW AT 10572.0' MD AT 1.5 BPM AT 3385 PSI. BHP /ECD /PVT: 4461 PSI / 9.59 PPG / 297 BBL. DELTA P ON MOTOR IS 710 PSI, 1500 LB DHWOB. MILLING W/ FULL RETURNS. Printed 1/28/2011 1:52:01PM Q u a Common Well Name: F -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/8/2010 End Date: X3- 00Y25 -C (1,205,177.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum: 28 : 27 10/13/1986 00:00 @67.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 13:30 2.00 STWHIP P WEXIT MILLING WINDOW AT 10573.3' MD AT 1.46 BPM AT 3250 PSI W/ 900 LB DHWOB AND FULL RETURNS. BHP /ECD /PVT 4464 PSI / 9.59 PPG / 296 BBLS. DELTA P ON MOTOR IS 550 PSI. IAP: 500 PSI, OAP 400 PSI. 13:30 - MILLING WINDOW AT 10574.9' MD AT 1,44 BPM AT 3140 PSI W/ 800 LB DHWOB AND FULL RETURNS. BHP /ECD/PVT 4464 PSI / 9.59 PPG / 294 BBL. DELTA P ON MOTOR IS 610 PSI. IAP : 610 PSI, OAP: 540 PSI. 13:30 - 15:45 2.25 STWHIP P WEXIT MILLING AHEAD. 14:00.- BELIEVE WE EXIT WINDOW AT 10575.5' MD. MILLING AHEAD AT 1.45 BPM AT 3100 PSI W/ 300 LB DHWOB AND FULL RETURNS. CONTINUE TIME MILLING TO ENSURE CLEAN LIP. NOTE: NO STALLS ON THIS WINDOW. BLEED OAP FROM 550 PSI TO -50 PSI IN 5 MINUTES. BLEED IAP FROM -650 PSI TO -60 PSI IN -10 MINUTES. MILL OPEN HOLE. 15 :45 - MILLING OH AT 10586' MD AT 3100 PSI AT -1.45 BPM W/ 300 LB DHWOB. PUH TO - PERFORM RECIPROCATIONS. 15:45 - 17:00 1.25 STWHIP P WEXIT PERFROM THREE RECIPROCATIONS ACROSS WINDOW AT BETWEEN 1 AND 2 FPM. WINDOW CLEAN FROM FIRST PASS. DRY DRIFT WINDOW, CLEAN. BTT PICKS: TOW 10571.1'. BOW 10575.5. RA TAG ESTIMATED TO BE AT 10576.3' MD. SAMPLES COME BACK TO SURFACE, "GOOD" INDICATION OF FORMATION FROM GEO. BEGIN POOH CIRCULATING AT -1.5 BPM W/ FULL RETURNS. 17:00 - 19:20 2.33 STWHIP P WEXIT POOH 19:20 - 19:30 0.17 STWHIP P WEXIT PJSM TO LD MILLING BHA AND MU DRILLING BHA. 19:30 - 19:40 0.17 STWHIP P WEXIT TAG UP AND BREAK OFF INJECTOR. 19:40 - 20:15 0.58 STWHIP P WEXIT LD WINDOW MILLING BHA. WINDOW MILL AND STRING REAMER NOGO ON 2.73 ". CHECKED TREE BOLT. ALL GOOD. FLOW CHECKED WELL FOR 30 MIN. NO FLOW OR LOSSES. 20:15 - 20:30 0.25 STWHIP P WEXIT KICK DRILL. DEPLOY SAFETY JOINT. 20:30 - 21:00 0.50 STWHIP P PROD1 MU DRILLING BUILD BHA. PU INJECTOR AND STAB ON WELL. 21:00 - 00:00 3.00 STWHIP P PROD1 RIH. PVT =256 BBLS 12/25/2010 00:00 - 00:30 0.50 DRILL P PROD1 FINISH RIH TO TIE IN DEPTH. 00:30 - 01:00 0.50 DRILL P PROD1 LOG GR TIE IN FROM 10435' TO 10456'. -5.5 CORRECTION. 01:00 - 03:30 2.50 DRILL P PROD1 HARD DRILLING ON BOTTOM. NO STALLS. STRINGERS GIVING US 50 DEGREE DOG LEGS. FS 3000 AT 1.4 BPM. PVT 295BBLS. WOB 1.5K 03:30 - 06:15 2.75 DRILL N RREP 10,710.00 PROD1 PUMP 1 OILER PUMP QUIT. WITHIN 10' OF WIPER DEPTH - WIPER FROM HERE INTO TUBING. ELECTRICIAN HERE TO FIX IT. Printed 1/28/2011 1:52:01PM '" Ws: ;i:'T 1 .! 1111" L �`x ' . ` �: " -� �, �� �,' `?� ���►''" a� �' �� Common Well Name: F -27 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 12/8/2010 End Date: X3- 00Y25 -C (1,205,177.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum: 28 : 27 10/13/1986 00:00 @67.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:15 - 07:30 1.25 DRILL N RREP 10,710.00 PROD1 WSL C /O. STANDBY TO FIX OILER PUMP, RECIPROCATE W/ OPEN EDC ABOVE LINER. USE SB TIME TO ALLOW CREW TO CALL HOME FOR HOLIDAYS. PUMP REPAIRED AND TESTED. RBIH TO DRILL AHEAD. 07:30 - 09:20 1.83 DRILL P PROD1 DRILL AHEAD FROM 10710' MD. FREESPIN 3080 PSI AT 1.5 BPM. 08 :30 - DRILLING AHEAD AT 10750' MD AT 1.5 BPM AT 3200 PSI W/ FULL RETURNS AND 640 LB DHWOB (16700 LB SURFACE WEIGHT) AT 50 FPH. BHP /ECD /PVT: 4522 PSI / 9.68 PPG / 297 BBLS. IAP = 335 PSI. OAP = 400 PSI. ail TRYING TO BE CONSERVATIVE W/ WOB TO MINIMIZE OUR DLS (GETTING MORE BUILD ferP THAN WE ANTICIPATED). 09:20 - DRILLING AHEAD AT 10790' MD AT 1.5 BPM AT 3230 PSI W/ FULL RETURNS AND 1500 LB DHWOB (15800' SURFACE WEIGHT) AT 46 FPH:; BHP /ECD /PVT: 4523 PSI / 9.69 PPG / 297 BBLS. IAP: 365 PSI. OAP: 430 PSI. 09:20 - 11:30 2.17 DRILL P PROD1 DD CALLS END OF BUILD AT 10790' MD. POOH FOR LATERAL BHA CIRCULATING W/ FULL RETURNS. 11:30 - 11:50 0.33 DRILL P PROD1 ..FLOW CHECK. PJSM. 11:50 - 12:45 0.92 DRILL - P PROD1 POP OFF. LD BUILD BHA. GRADE BIT 1- 3- CT- G- X -1 -BT -BHA. CHANGE MOTOR BEND. 12:45 - 13:15 0.50 DRILL P PROD1 ,,MU LATERAL BHA W/ REBUILT HYCAI OR RAZOR BIT. STAB ON. 13:15 - 15:45 2.50 DRILL P PROD1 RIH W/ LATERAL BHA. 14:00 - RIH AT 3600' CIRCULATING AT 0.4 BPM AT 1280 PSI W/ FULL RETURNS. IAP: 110 PSI. OAP: 320 PSI. TIE -IN, CORRECTION OF (-6'). 15:45 - 17:25 1.67 DRILL P PROD1 DRILL AHEAD FROM 10790' MD AT 1.5 BPM AT 3290 PSI (3200 PSI FREESPIN) W/ 800 LB DHWOB AND 18000 LB SURFACE WEIGHT W/ FULL RETURNS AT 120 FPH. BHP/ECD /PVT: 4510 PSI / 9.66 PPG / 295 BBL. IAP: 160 PSI. OAP: 310 PSI. 16:30 - DRILLING AHEAD AT 10866' MD AT 1.5 BPM AT 3335 PSI W/ 650 LB DHWOB AND 16700 LB SURFACE WEIGHT W/ FULL RETURNS AT 105 FPH. BHP /ECD /PVT: 4537 PSI / 9.72 PPG / 294 BBLS. IAP: 270 PSI. OAP: 340 PSI. DRILL TO 10,950' MD. 17:25 - 17:45 0.33 DRILL P PROD1 WIPER TRIP FROM 10,950' TO WINDOW. CLEAN WIPER TRIP 17:45 - 19:30 1.75 DRILL P PROD1 DRILLING FROM 11,050' 1.5 BPM, 3480 PSI TO 11,101', 85 - 93 FPH. FS 3100PSI PVT 287 BBLS, IA 376 PSI, OA 421 PSI 19:30 - 20:30 1.00 DRILL P PROD1 WIPER TRIP FROM 11,101' TO WINDOW, TIGHT AT 11,040' WHILE RIH. WITH 1 STALL ON MOTOR. PVT 282 BBLS 20:30 - 22:00 1.50 DRILL P PROD1 DRILLING FROM 11,101', 1.53 BPM, 3600 PSI, 100 FPM. PVT 282 BBLS. FS 3100 PSI DRILLING TO 11,250" Printed 1/28/2011 1:52:01PM 2 ME OT ALASKA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION CO MMI SSION ANCHORAGE, ALASKA 99501 -3539 - - �- PhtONE (907) 279 -1433 ~ FAX (907) 276 -7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. NC's ()�� P.O. Box 196612 g V I Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F -27A Sundry Number: 310 -373 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Chair DATED this day of November, 2010. Encl. STATE OF ALASKA ALASKIOL AND GAS CONSERVATION COMMIAN i 0 APPLICATION FOR SUNDRY APPROVAL �� 20 AAC 25.280 1. Type of Request: ❑ Abandon ® Plug for Redrill - ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development- ❑ Exploratory 205 -12 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50- 029 - 21659 -01 -00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU F -27A , Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 028280 1 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12415- 9037 1 12379 9038 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 11 110 110 Surface 2696' 13-3/8" 2696' 2696' 4 30 2670 Intermediate 9736' 9-5/8" 736' 8456' 6870 476 Production Liner 928' 7" 9491'- 10419' 8258'- 85' 7240 10 Liner 2924' 3 -1/2" x 3- 3/16" x 2 -7/8" 1' - 12415' 25 - 9037' 13450 13890 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10720'- 12365' 1 9050 4 -1/2 ", 12.6# L -80 9539' Packers and SSSV Type: 9 -5/8" x 4 -1/2" TIW HBBP Packer Packers and SSSV 9434'/ 8213' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch ❑Exploratory - ®Development ❑service ❑ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: November 10, 2010 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned ❑ WAG ❑ SPLUG - ® Suspended Commission Representative: 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Amanda Rebol, 564 -5543 Printed Name Jo0ak.-MuPdP Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564 -4711 Date f / Z_? fd Elizabeth Barker, 564 -4628 Commission Use Onl Conditions of approval: Notify Commission so that a representative may witness D ,3i 13 �/ Sundry Number: i 3 1 [I Plug Integrity p BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance 3Soo to 5G S6 P r S/- . ��` ` Other. �F 2,560 Mosel /4 n n I c s f r '""`� I ' CEC I V_ E � 1�e r►, P � � j4.c e- 11- � I t a " 20 �! -.4t� Z S . ! 1 Z l #' 2010 Subsequent Form Required: / d ^ Y d Aiasj o 00 & Ga Cons COM s Anchorage I APPROVED BY Approved By: COMMISSIONER THE COMMISSION Date Form 10-403 Revi MO M N Q J C . bmi / t In Duplicate ORIGINAL. 74 To: Alaska Oil & Gas Conservation Commission O b p From: Amanda Rebol CTD Engineer Date: October 26, 2010 Re: F -27A Sundry Approval Sundry approval is requested for F -27A. F -27A was a 2005 coil sidetrack targeting upper Zone lA/1B sands after the parent well, F -27 gassed out. The parent perfs in Zone 1 were squeezed off for the sidetrack, and F -27A was planned and drilled above the MHO to maximize standoff from the GOC. F -27A was completed with a 3 -1/2" x 3- 3/16" x 2 -7/8" tapered solid liner that was cemented and ties back into the existing 4 -1/2" tubing. A total of 1105' of perforations were shot in the 2 -7/8" liner, targeting Zone IA/1B. The majority of the perfs ( -720') were shot in Zone IA, throughout the length of the completion - Zone 1B was encountered in the toe of the well. After the sidetrack, F -27A produced at low GOR until a prolonged shut -in period in 2008. When the well was brought back online, the gas rate increased with a decline in oil rate, quickly making the well uncompetitive, with high GORs. The well was shut in for the majority of 2009 to determine if it would heal or show signs of cycling ability. However, when POP'd in early 2010, F -27A showed signs of elevated gas rate and no healing or cycling ability. REASON FOR SIDETRACK Given the very low oil rates and high GOR, F -27A is a good candidate for a coil sidetrack. The proposed sidetrack will target 1600' of Zone 1 and will provide additional offtake in a — 25acre drainage target in central F -Pad. The proposed plan for F -27B is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around November 27, 2010 The existing perforations will be isolated beneath a packer whipstock set in the 3- 3/16" tubing. The sidetrack, F -27B, will exit the existing 3- 3/16" liner and kick off in zone, intentionally drilling just in the MHO/HOT for the first portion of the wellbore to maximize gas standoff and leave options for future sidetracks. The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. co1u (,Q� ��� @ �, na f s'o d ¢ Pre -Rig Work: (scheduled to begin November 10, 2010) he0l,''/ OVV-f a I Pa r f 6hvr- 1. O MTT -IA 3000psi p f4ct -4 wys q c tv9l� h' ie' 2. O MIT -OA 2000psi r r " f 3. F PPOT -T/IA k do 7de a„!� p ,, !/� v� ,'ti 4. C Drift for whipstock to 10,600' f,d� -rr4ck(Nj / •-y e s i „ t // S 4 0 1 1 /0 r:,, 4 5. W Check lock -down screws; torque to spec �� le v� frD.�► i �,s � d^ o'� 6. V Set TWC, pressure test tree, pull TWC 7. O Remove wellhouse, level pad, remove flow line rA e 8. V Set TWC (within 24 hours of MIRU Nordic 1) Rig Work: (scheduled to begin on November 27, 2010) , R r N 1. MIRU and test BOPE to 250 psi low d 35 --� / w s 2. Mill 2.74" window at 10,600' through 3- 3/16" liner 3. Drill Build: 3" OH, 315' (42 deg/100 planned) 4. Drill Lateral: 3" OH, 1315' (12 deg/ 100 planned) n f�.,�, PTj> 5. Run 2 -3/8" slotted liner, leaving TOL at 10,400' 6. Freeze protect well, RDMO Post -Rig Work: 1. Re- install wellhouse and FL's. 2. Pull TWC Amanda Rebol CTD Engineer 564 -5543 CC: Well File Sondra Stewman/Terrie Hubble TREE= 6" McEVOY WELLHEAD = McEVOY SAFETY ES. ACTUATOR = OTIS • F -2 7 A Nw KB. ELEV = 67.9' BF. ELEV - 38.41' 'T KOP = 10414' Max Angle = 94.5 @ 11256' 2087' 4 -1/2" OTIS SSSV NIP, ID = 3.813" Datum MD = 10269' Datum TV = 8800' SS GAS LIFT MANDRELS 13 -3/8" CSG, 68 #, L -80, ID = 12.415" 2694 ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 2985 2984 6 OTIS DMY RM 0 09/23/10 6 5058 4793 39 OTIS DMY RM 0 09/23/10 5 6575 5952 41 OTIS DMY RA 0 09/23/10 4 7511 6676 38 OTIS DMY RA 0 09/23110 Minimum ID = 2.37" @ 10600' 3 8094 7132 39 OTIS DMY RA 0 09/23/10 2-7/8" STL LINER 2 8714 7621 37 OTIS DMY RA 0 09/23110 1 1 9215 180311 34 1 OTIS I DMY I RA 1 0 09/23/10 9361 4 -1/2" OTIS XA SLIDING SLEEVE 9419 TW SBR TBG SEAL ASSY 9434 9 -518" X 4 -1 /2" TNV HBBP PKR, ID = 4.75" 9475' 4-1/2" OTIS X NIP, ID = 3.813" TOP OF 7" LNR 9490' 9491' BOT DEPLOY SLEEVE, ID = 3.00" 950$' 4 -1/2" OTIS XN NIP, MILLED (08/21/05) ID = 3.80" (BEHIND PIPE) 4 -1/2" TBG, 12.6 #, L-80_0152 bpf, ID = 3.958" 9539' 9510 3 -1/2" HOWCO X NIP, 3 -1/2" LNR, 8.81 #, L -80 STL, .0087 bpf, ID = 2.990" 9543 9539 F 1/2 - KER SOS TBG TAIL 9 -5/8" CSG, 47 #, L -80, ID = 8.681" 9734' 9544' ELMD TT LOGGED 11/06/86 9543 3 -1/2" X 3- 3/16" XO, ID = 2.867" ESTIMATED TOP OF CEMENT 10300 10192 MARKER JOINT 7" x 4 -1/2" MECHANICAL WS (08/19/05) 10414 MILLOUT WINDOW (F -27A) 10419' - 10426' RA PIP TAG (8/19/05) 10424' �.: F PBTD 10626' 10600' 3 -3/16" - X2-7/8' XO, ID = 2.372" 7" LNR, 26 #, L -80, 1,14S, .0383 bp = 6.276" 10670' PERFORATION SUMMARY 3- 3/16" LNR, 6.2 #, L -80 TCII, 10600' REF LOG: MWD GR LOG 08/30/05 1 .0076 bpf, ID = 2.80" ANGLE AT TOP PERF: 94 @ 10720' Note: Refer to Production DB for historical pert data PBTD 12379' SIZE SPF INTERVAL Opn /Sqz DATE 2" 6 10720 - 10990 O 09/01/05 2" 6 11060 - 11190 O 09/01/05 2 -7/8" LNR, 6.16 #, L -80 STL, .0058 bpf, ID = 2.441 12415' 2" 6 11290 - 11370 O 09/01/05 2" 6 11480 - 11720 O 09/01/05 2" 6 11890 - 12180 O 09/01/05 2" 1 6 1 12270 - 12365 1 O 1 09/01/05 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/31/86 ORIGINAL COMPLETION WELL: F -27A 09/02/05 NORDIC 1 CTD PERMIT No: 2051240 08/25/05 JLMITLH MILLED NIPPLE (08/21/05) API No: 50- 029 - 21659 -01 09/09/05 KSB/TLH I GLV CIO SEC 2, T11 N, R1 3E, 2249' FSL & 2195' FEL 11/16/06 CAZ /PJC DRLG DRAFT CORRECTION 09/26/10 MSS /PJC I GLV C/O (09/23/10) BP Exploration (Alaska) TREE= 6" EVOY F-27B S` Fes: W WIELLHEAD= McEVOY ACTUATOR = OTIS KB. ELEV = 67 .9' Proposed CTD Sidetrack 14W BF. R EV = 38.41' 'T KO = 1041 Max Angle = 94.5 @ 11256' O 208T 4-1/2" OTIS SSSV NIP, ID = 3.813" Datum MD = 10269 Datum TV = 8800' SS GAS LIFT MANDRELS 13 -3/8" CSG, 68#, L -80, ID = 12.415" 2694' ST MD TVD DEV TYPE VLV LATCHI PORTI DATE 7 2985 2984 6 OTIS DMY RM 0 09/23/10 6 5058 4793 39 OTIS DMY RM 0 09/23/10 5 6575 5952 41 OTIS DMY RA 0 09/23/10 4 7511 6676 38 OTIS DMY RA 0 09123!10 Minimum ID = 2.76" @ 9543' 3 8094 7132 39 OTIS DMY RA 0 09/23/10 3- 3/16" TCII LNR 2 8714 7621 37 OTIS DMY RA 0 09/23/10 1 1 9215 18031 1 34 1 OTIS I DMY I RA 1 0 09/23/10 71- 17 9361' 4-1/2" OTIS XA SLIDING SLEEVE 9419' TNV SBR TBG SEA L A SS — Y] 9434' 9 -5/8" X 4-1/2" TM✓ HBBP PKR, ID = 4.75" 9475' 44-1/2" O S X NIP, ID = 3.813" TOP OF T' LNR 9490' 9491' BOT DEPLOY SLEEVE, ID = 3.00" 9508' 4 -1/2" OTIS XN NIP, MILLED (08/21/05) ID = 3.80" (BEHIND PIPE) 4-1/2" TBG, 12.6#, L -80, .0152 bpf, ID = 3 -958" 9539' 9510 3 -1 /2" HOWCO X NIP, ID 3-1/2" LNR, 8.81#, L -80 STL, .0087 bpf, ID = 2.990" 9543' 9539' 44 BAKER SOS TBG TAIL 9 -5/8" CSG, 47 #, L -80, ID = 8.6-0 - .71 9734' 9544 ELMD TT LOGGED 11 /06/86 14 3- 3116" LNR, 6.2#, L -80 TCII - 0076bpf, ID= 2.80" 10600' 9543 3-1/2" X 3- 3/16" XO, ID = 2.86T' ESTIMATED TOP OF CEMENT 10300' 10192' MARKER JOINT 7" x 4 -112" MECHANICAL WS (08/19!05) 10414' MILLOUT WINDOW (F -27A) 10419' - 10426' RA PIP TAG (8 /19/05) 10424' 7" LNR, 26 #, L -80, U4S, .0383 bpf, ID = 6.276" 10670' 10400' 1 Top of 2 -3/8" slotted liner 10590' 3- 3/16" packer whipstock PERFORATION SUMMARY REF LOG: MWD GR LOG 08/30/05 ANGLE AT TOP PERF: 94 @ 10720' o Note: Refer to Production DB for historical perf data 86 SIZE SPF INTERVAL Opn /Sqz DATE Z' 6 10720 -10990 O 09101/05 2 -3/8" slotted liner to 12230' 2" 6 11060 -11190 O 09/01/05 2" 6 11290 - 11370 O 09/01/05 10600' 3- 3/16" X 2 -7/8" XO, ID = 2.372" 2" 6 11480 -11720 O 09/01/05 2" 6 11890 -12180 O 09/01/05 Z' 1 6 1 12270 - 12365 1 O 1 09/01/05 2-7/8" LNR, 6.16#, L -80 STL, .0058 bpf, ID = 2.441 12415' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10131186 ORIGINAL COMPLETION 10/04/10 MSE PROPOSED CTD SIDETRACK WELL: F -27 09102 /OS NORDIC 1 CTD PERMIT No: 08/25/05 JLMITLH MILLED NIPPLE (08/21/05) API No: 50-029-21659-'i, 09/09/05 KSB/TLH GLV C/O SEC 2, T11 N, R13E, 2249' FSL & 2195' FEL 11/16/06 CAZ /PJC I DRLG DRA FT CORRECTION 09/26/10 MSS /PJC I GLV C/O (09/23/10) BP Exploration (Alaska) NORDIC- CALISTA RIG 1 CHOKE / REEL/CIRCULATION MANIFOLD DIAGRAM V12 V14 7 -1116" 5000 Psi BOP'S ID = 7.06" V15 V11 ] Ins' eseo qI, aX-ta Transducers ,OOR SO V V2 V7 V 16 GASSE Nab: iaMz+K am exensamnl tar a-aaa" � letl dHIH V6 7ine'sees P.1, ax+e V10 V17 HCR IC IK OK To Poor Boy Gas Buster V4 5 V7 V18 a Ina" eaoo wi ,axon a;ao" Coos F.+.NCa.. V8 *- ins- sons pi CHECK Manual Choke v4VE MEOH /Diesel — — — _ — — _ _ — — — — . _ ] Allb Cameren fOV ash VaM x asae asi asesell P Line CoFlez Hose 1/4 Turn Halco 10W OG To Production Tree or Cross Over re transducers CoFlex Hose CV11 CV12 ! To Coiled Tubing ' Bleed Off Inner Reel Valve CV13 Cemem Line In -- GrourM Level Tle-fn CV70 CV3 CV2 TSland Pip. - Manuel Choke Pressure Transducers CV17 CV1 CVS Tiger Tank Mud Pump 2 N From O Baker + MP 1 & MP 2 ® Choke KIII CV14 to Pits Line Rig Floor Mud Pump 111 V16 Reverse Circ no Lin. C11 CT To Manifold CV75 1 Jun -201 0 CoFlex Hose Page 1 of 1 Schwartz, Guy L (DOA) From: Rebol, Amanda [reboa2 @BP.com] Sent: Friday, November 05, 2010 9:41 AM i, _ Z To: Schwartz, Guy L (DOA) Subject: Re: F -28A P &A ( PX4- 294 -8(M) Z �S `� Z Guy - Due to deviation at the whipstock set depth, we'll be doing it with the rig. It'll be our first operation once we're over the well. F -27B will be doing th e same. 1 J S � � S. D S4 Thanks - Amanda On Nov 5, 2010, at 9:21 AM, "Schwartz, Guy L \(DOA \) " <guy.schwartz@alaska.gov> wrote: Amanda, In reviewing the procedure for F -28A I don't see a step for setting the whipstock. Is E -line setting it or Coil pre rig ?? Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) i 06/18/10 • !~ $CIIIUig6@I'~1' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job k N0.5545 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD E-198 BBUO-00015 STATIC BOTTOM & TEMP SURVEY 04/03/10 1 1 H-30 BCRD-00020 PRODUCTION PROFILE 05/10/10 1 1 P2-34 83S0-00071 STATIC PRESSURE SURVEY 05/15!10 1 1 P2-34 83SQ-00073 (PROF WITH STATIC SURVEY 05!19/10 1 1 V-05 AWJI-00090 MEM CBL .~ ~ 05/24/10 1 1 P2-17 BCRC-00017 PRODUCTION PRO ICE .06/01/10 1 1 16-068 BBUO-00023 PRODUCTION PROFILE 06/08/10 1 1 S-21 Z-46A BBSK-00019 BAUJ-00027 PRODUCTION PROFILE MEM CBL 06/03/10 06/01/10 1 1 1 1 V-OS 01-26A BD88-00018 B14B-00106 MEM LDL SCMT 06/08/10 06H 0/10 1 1 1 1 B-13A 1-27/P-20 BBUO-00019 AYKP-00085 USIT RST & FL RECOR 05/28!10 O6/O6/10 / 1 1 1 1-27/P-20 MPF-82A AYKP-00065 BAUJ-00010 PRODUCTION PROFILE MCNL 06/06/10 04/06/10 1 1 1 1 Z-16A E-150 BCUE-00005 AWJI.00081 CH EDIT PDC MEM CORK CATION MCNL 04/06/10 04/03!10 1 1 1 05-19 F-27A BBKA-00013 AYKP-00078 RST - RST 03/14/10 03/17/10 1 1 1 1 J-18A BD88-00010 MCNL 04/18/10 1 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-i 900 E. Benson Blvd. Alaska Data 8 Consulting Services 2525 Gambell Street, Sufle 400 Anchorage, AK 99503-2838 ~~~ ,. 9 ,iI.J~+ f ~~ ?Qt~i . ~° . ~r~ ' ~~~ ~~ J gyrodata Gyrodata Incorporated 1682 W. Sam Houston Fktivy. N Houston, Texas 77043 713'461-3146 Fax: 7 1 3146 1-092(1 APR ~~ ~ 200 SURVEY REPORT BP F-Pad #F-27 ~ Prudhoe Bay, AK AK0208G_111 27 Feb 2008 • Serving the t~~crl~wide Cr;ergv !r~iustry v~rith Precision Su acv ~~st ~.: ~ . e2- oS'-~.2 ~f gyrodata GyrocEata Pncorporated 1682 W. Sam Houston Pkwy. N. Hcuston.Texas 77043 713%461-3146 Fax: 713/461-0920 March 7, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: F-Pad, Well #F-27 Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to -take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, ~~ ~~ Rob Shoup North American Regional Manager RS:tf Serving ttie lnlorld~wide Energ~r industry vti tip F'recis~a, Sure- ~, ~~ _'s~ ~ ~t~lt;n w A Gyrodata Directional Survey for BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 Run Date: 2/29/2008 l :43:15 PM Surveyor: Steve Thompson Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.201000 deg. N Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyrod ata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE DEPTH SEVERITY DEPTH DIST. A ZIMUTH feet deg. deg. deg./ feet feet deg. 100 ft. 0.00 0.00 0.00 0.00 0.00 0.0 0.0 Rate gyroscopic continuous survey run in tubing Measured depths are referenced to 22.5 feet above the base flange screws Base flange is 38.41 feet AMSL and the RKB is 67.9 feet AMSL ------------------------------------------------------------------------------------ -- 100.00 0.13 67.26 0.13 100.00 0.1 67.3 200.00 0.26 133.96 0.24 200.00 0.4 100.6 300.00 0.33 149.77 0.11 300.00 0.8 124.8 400.00 0.40 165.45 0.12 400.00 1.4 139.1 500.00 0.45 169.55 0.06 499.99 2.1 148.8 600.00 0.49 173.68 0.06 599.99 2.9 155.2 700.00 0.52 180.87 0.07 699.99 3.7 160.4 800.00 0.56 188.06 0.08 799.98 4.6 165.2 900.00 0.59 194.71 0.08 899.98 5.5 169.9 1000.00 0.63 201.23 0.08 999.97 6.4 174.3 1100.00 0.60 197.42 0.05 1099.97 7.4 177.8 1200.00 0.58 193.58 0.05 1199.96 8.4 180.0 1300.00 0.75 188.45 0.18 1299.95 9.6 181.3 1400.00 0.92 183.37 0.18 1399.94 11.0 181.8 1500.00 0.99 183.04 0.07 1499.93 12.7 182.0 1600.00 1.06 182.76 0.07 1599.91 14.5 182.1 1700.00 1.21 187.10 0.18 1699.89 16.4 182.5 1800.00 1.37 191.58 0.18 1799.87 18.7 183.3 1900.00 1.42 208.25 0.41 1899.84 21.0 185.2 2000.00 1.47 224.76 0.42 1999.81 23.2 188.4 2100.00 1.42 227.08 0.08 2099.77 25.2 191.9 2200.00 1.36 229.30 0.08 2199.75 27.2 195.0 2300.00 1.17 222.27 0.24 2299.72 29.1 197.2 2400.00 0.99 215.11 0.23 2399.70 30.9 198.5 2500.00 1.16 195.78 0.40 2499.69 32.7 198.8 HORIZONTAL COORDINATES feet 0.00 N 0.04 N 0.07 S 0.48 S 1.07 S 1.79 S 2.60 S 3.48 S 4.42 S 5.41 S 6.42 S 7.43 S 8.43 S 9.57 S 11.01 S 12.67 S 14.45 S 16.43 S 18.65 S 20.91 S 22.92 S 24.67 S 26.29 S 27.82 S 29.29 S 30.96 S 0.00 E 0.11 E 0.3 8 E 0.69 E 0.93 E 1.08 E 1.20 E 1.24 E 1.17 E 0.97 E 0.64 E 0.28 E 0.01 E 0.21 W 0.35W 0.45 W 0.54W 0.71 W 1.08 W 1.91 W 3.40W 5.22W 7.02W 8.61 W 9.80W 10.57W 1 A Gyrod ata Directional Survey BP Location: Mast Truck , Lease: F PAD Well: F-27, Job Numbe r: AK0208G 111 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 2600.00 1.32 176.62 0.44 2599.66 34.8 198.0 33.09 S 10.78W 2700.00 1.40 ] 72.48 0.13 2699.b3 37.0 196.6 35.46 S 10 55W 2800.00 1.51 167.70 0.16 2799.60 39.3 194.9 37.96 S . 10 11 W 2900.00 3.78 104.12 3.39 2899.51 40.6 189.4 40.04 S . 6.63W 3000.00 6.04 41.28 5.47.. 2999.19 36.9 179.9 36.89 S 0.04 E 3100.00 8.17 46.72 2.22 3098.42 29.4 162.8 28.06 S 8.68 E 3200.00 10.28 52.10 2.28 3197.13 27.4 130.3 17.71 S 20.90 E 3300.00 l 1.67 52.68 1.40 3295.29 36.5 99.6 6.10 S 35.98 E 3400.00 13.09 53.30 1.42 3392.97 53.5 82.7 6.80 N 53.11 E 3425.00 13.76 54.19 2.81 3417.28 58.7 80.0 10.23 N 57.79 E 3450.00 14.44 54.93 2.84 3441..53 64.2 77.6 13.76 N 62.75 E 3475.00 14.70 54.35 1.17 3465.73 70.1 75.6 17.40N 67.88 E 3500.00 15.54 54.87 3.43 3489.86 76.2 73.9 21..18 N 73.20 E 3525.00 15.83 53.46 1.91 3513.93 82.6 72.3 25.14 N 78.68 E 3550.00 16.76 53.88 3.76 3537.92 89.3 70.8 29.29 N 84.33 E 3575.00 17.21 52.26 2.60 3561.83 96.3 69.5 33.68 N 90.16 E 3600.00 18.14 53.47 3.99 3585.65 103.5 68.3 38.26N 96.22 E 3625.00 19.15 52.37 4.29 3609.34 111.3 67.2 43.08 N 102.59 E 3650.00 19.82 52.94 2.77 3632.91 119.4 66.2 48.14 N 109.22 E 3675.00 20.82 52.49 4.05 3656.35 127.8 65.3 53.40 N 116.13 E 3700.00 21.10 52.83 1.21 3679.70 136.6 64.5 58.82 N 123.24 E 3725.00 22.08 53.04 3.95 3702.95 145.6 63.8 64.36 N 130.58 E 3750.00 22.43 53.33 1.47 3726.08 154.9 63.1 70.04 N 138.16 E 3775.00 23.31 54.15 3.73 3749.12 164.5 62.6 75.78 N 145.99 E 3800.00 24.42 53.30 4.64 3771.98 174.5 62.1 81.77 N 154.14 E 3825.00 25.40 54.33 4.29 3794.65 184.9 61.6 87.98 N 162.64 E 3850.00 26.07 53.81 2.83 3817.18 195.7 61.2 94.35 N 171.43 E 3875.00 26.15 54.03 0.51 3839.62 206.6 60.8 100.83 N 180.32 E 3900.00 26.97 54.56 3.41 3861.99 217.7 60.5 107.36 N 189.40 E 3925.00 27.01 54.08 0.89 3884.26 229.0 60.2 113.97 N 198.61 E • A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27. Job Number: AK0208G MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 3950.00 27.59 54.86 2.73 3906.48 240.4 59.9 120.64 N 207.95 E 3975.00 28.41 53.71 3.92 3928.55 252.1 59.6 127.49 N 217 48 E 4000.00 28.89 54.I 7 2.12 3950.49 264.0 59.4 134.54 N . 227 17 E 4025.00 30.17 53.64 5.20 3972.24 276.3 59.1 141.80 N . 237 12 E 4050.00 30.50 54.14 1.67 3993.82 288.9 58.9 149.25 N . 247.32 E 4075.00 3 l .40 54.30 3.58 4015.26 301.7 58.7 156.76 N 257.76 E 4100.00 31.87 53.98 2.03 4036.54 314.8 58.5 164.45 N 268.38 E 4125.00 32.28 54.58 2.05 4057.73 328.0 58.3 172.20 N 279.16 E 4150.00 32.31 53.68 1.92 4078.86 341.3 58.2 180.02 N 289.98 E 4175.00 32.80 53.59 1.97 4099.93 354.7 58.0 188.00 N 300.81 E 4200.00 32.63 52.68 2.06 4120.97 368.2 57.8 196.11 N 311.62 E 4225.00 33.52 53.04 3.61 4141.92 381.8 57.6 204.34 N 322.50 E 4250.00 34.02 52.88 2.06 4162.70 395.6 57.5 212.71 N 333.59 E 4275.00 34.91 53.49 3.83 4183.31 409.8 57.3 221.19 N 344.92 E 4300.00 35.44 53.43 2.10 4203.74 424.1 57.2 229.76 N 356.49 E 4325.00 36.27 53.78 3.41 4224.01 438.7 57.1 238.45 N 368.28 E 4350.00 36.51 53.56 1.12 4244.13 453.5 57.0 247.24 N 380.23 E 4375.00 37.46 54.09 3.99 4264.10 468.6 56.9 256.12 N 392.37 E 4400.00 37.78 54.02 1.29 4283.90 483.8 56.8 265.07 N 404.72 E 4425.00 38.77 54.70 4.33 4303.53 499.3 56.7 274.10 N 417.31 E 4450.00 39.27 54.66 1.99 4322.95 515.0 56.6 283.20 N 430.15 E 4475.00 39.36 54.93 0.78 4342.29 530.8 56.6 292.33 N 443.09 E 4500.00 38.83 54.34 2.58 4361.70 546.6 56.5 301.45 N 455.95 E 4525.00 38.97 54.78 1.24 4381.15 562.3 56.5 310.56 N 468.74 E 4550.00 38.92 54.25 1.35 4400.59 578.0 56.4 319.68 N 481.54 E 4575.00 39.14 55.17 2.49 4420.02 593.7 56.4 328.78 N 494.39 E 4600.00 39.03 54.61 1.48 4439.42 609.5 56.3 337.84 N 507.28 E 4625.00 39.23 55.03 1.34 4458.81 625.3 56.3 346.93 N 520.18 E 4650.00 38.82 55.06 1.67 4478.23 641.0 56.3 355.95 N 533.08 E 4675.00 38.92 55.05 0.43 4497.70 656.7 56.2 364.94 N 545.94 E ~ ~ A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 4700.00 38.97 55.26 0.54 4517.14 672.4 56.2 373.92 N 558 83 E 4725.00 38.84 55.32 0.53 4536.60 688.1 56.2 382.86 N . 571.74 E 4750.00 38.78 55.66 0.88 4556.08 703.8 56.2 391.74 N 584.65 E 4775.00 38.77 55.45 0.53 4575.57 719.4 56.2 400.59N 597.56 E 4800.00 39.06 55.88 ] .58 4595.02 735.1 56.2 409.45 N 610.53 E 4825.00 38.34 55.44 3.09 4614.53 750.7 56.1 418.27 N 623.44 E 4850.00 38.86 55.17 2.20 4634.07 766.3 56.1 427.15 N 636.26 E 4875.00 38.52 54.90 1.51 4653.58 782.0 56.1 436.1ON 649.07 E 4900.00 38.49 55.59 1.72 4673.14 797.5 56.1 444.97N 661.86 E 4925.00 38.57 54.49 2.76 4692.70 813.1 56.1 453.90 N 674.62 E 4950.00 38.56 55.26 1.91 4712.25 828.7 56.0 462.86 N 687.37 E 4975.00 38.26 55.12 1.24 4731.84 844.2 56.0 471.73 N 700.12 E 5000.00 38.81 55.35 2.29 4751.39 859.8 56.0 480.61 N 712.91 E 5025.00 38.54 55.44 1.11 4770.91 875.4 56.0 489.48 N 725.77 E 5050.00 39.04 55.96 2.41 4790.40 891.1 56.0 498.31 N 738.71 E 5075.00 38.74 55.89 1.25 4809.86 906.8 56.0 507.10 N 751.71 E 5100.00 ,39.01 55.80 1.13 4829.32 922.5 56.0 515.91 N 764.70 E 5125.00 38.86 56.91 2.88 4848.77 938.2 56.0 524.62 N 777.77 E 5150.00 38.82 55.11 4.54 4868.24 953.8 56.0 533.38 N 790.77 E 5175.00 38.73 55.84 1.86 4887.73 969.5 56.0 542.25 N 803.67 E 5200.00 38.45 56.42 1.85 4907.27 985.1 56.0 550.94 N 816.62 E 5225.00 38.27 54.92 3.80 4926.87 1000.6 56.0 559.69 N 829.43 E 5250.00 37.81 55.55 2.42 4946.56 1016.0 56.0 568.48 N 842.09 E 5275.00 37.76 56.07 1.28 4966.32 1031.3 56.0 577.08 N 854.76 E 5300.00 38.27 55.61 2.33 4986.02 1046.7 56.0 585.73 N 867.50 E 5325.00 38.12 55.22 1.14 5005.67 1062.2 56.0 594.51 N '880.22 E 5350.00 38.05 55.97 1.88 5025.34 1077.6 56.0 603.22 N 892.95 E 5375.00 38.36 55.84 1.28 5044.99 1093.1 56.0 611.88 N 905.75 E 5400.00 38.05 55.54 1.44 5064.63 1108.5 56.0 620.60 N 918.52 E 5425.00 38.30 55.19 1.35 5084.29 1124.0 55.9 629.38 N 931.24 E A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 5450.00 38.53 55.70 1.56 5103.87 1139.5 55.9 638.19 N 944.03 E 5475.00 38.61 57.14 3.61 5123.42 1155.1 55.9 646.81 N 957.01 E 5500.00 39.10 55.84 3.83 5142.89 1170.8 56.0 655.47 N 970.09 E 5525.00 39.76 56.07 2.68 5162.20 1 l 86.7 56.0 664.36 N 983.25 E 5550.00 39.85 57.73 4.26 5181.41 1202.7 56.0 673.10 N 996.65 E 5575.00 39.60 56.53 3.22 5200.64 1218.6 56.0 681.77 N 1010.07 E 5600.00 39.78 55.73 2.17 5219.87 l 234.6 56.0 690.67 N 1023.33 E 5625.00 39.67 57.57 4.71 5239.10 1250.6 56.0 699.45 N 1036.67 E 5650.00 39.64 57.11 1.18 5258.35 1266.5 56.0 708.07 N 1050.10 E 5675.00 40.26 55.75 4.29 5277.51 1282.6 56.0 716.94 N 1063.48 E 5700.00 40.62 57.43 4.60 5296.54 1298.8 56.0 725.87 N 1077.01 E 5725.00 40.59 57.36 0.21 5315.52 1315.0 56.0 734.64 N 1090.72 E 5750.00 40.49 55.91 3.79 5334.52 1331.3 56.0 743.57 N 1104.29 E 5775.00 40.76 57.09 3.24 5353.50 1347.6 56.1 752.56 N 1117.86 E 5800.00 40.84 58.02 2.45 5372.42 1363.9 56.1 761.32 N 1131.65 E 5825.00 40.89 56.90 2.92 5391.33 l 380.3 56.1 770.12 N 1145.44 E 5850.00 40.81 57.32 1.14 5410.24 1396.6 56.1 779.00 N 1159.17 E 5875.00 40.88 58.14 2.15 5429.15 1412.9 56.1 787.73 N 1172.99 E 5900.00 41.10 58.30 0.98 5448.02 1429.3 56.1 796.36 N 1186.93 E 5925.00 40.75 57.47 2.60 5466.91 1445.7 56.2 805.07 N 1200.80 E 5950.00 41.19 57.51 1.77 5485.79 1462.1 56.2 813.88 N 1214.62 E 5975.00 41.09 58.89 3.65 5504.62 1478.5 56.2 822.55 N 1228.60 E 6000.00 41.26 58.46 1.31 5523.44 1495.0 56.2 831.10 N 1242.66 E 6025.00 41.47 57.49 2.70 5542.20 1511.5 56.2 839.87 N 1256.67 E 6050.00 41.29 58.70 3.28 5560.96 1528.0 56.3 848.60 N 1270.69 E 6075.00 41.57 58.86 1.19 5579.70 1544.5 56.3 85?.18 N 1284.84 E 6100.00 41.21 57.91 2.91 5598.46 1561.0 56.3 865.84 N 1298.92 E 6125.00 41.12 58.46 1.48 5617.28 1577.5 56.3 874.51 N 1312.90 E 6150.00 41.48 58.21 1.57 5636.06 1594.0 56.4 883.18 N 1326.94 E 6175.00 41.27 59.61 3.80 5654.82 1610.5 56.4 891.71 N 1341.09 E . w M A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 6200.00 41.05 59.02 1.78 5673.64 1626.9 56.4 900.11 N 1355.24 E 6225.00 41.24 57.79 3.31 5692.47 1643.4 56.4 908.73 N 1369.25 E 6250.00 41.50 59.32 4.18 5711.23 1659.9 56.5 917.35 N 1383.35 E 6275.00 41.28 59.07 1.11 5729.98 1676.4 56.5 925.81 N 1397.55 E 6300.00 40.84 57.63 4.18 5748.83 _1692.8 56.5 934.43 N 1411.53 E 6325.00 42.05 58.03 4.94 5767.57 1709.3 56.5 943.24 N 1425.53 E 6350.00 41.59 59.67 4.73 5786.21 1726.0 56.5 951.86 N 1439.80 E 6375.00 40.27 58.31 6.36 5805.10 1742.4 56.6 960.30N 1453.83 E 6400.00 41.45 57.65 5.04 5824.00 1758.7 56.6 968.97 N 1467.70 E 6425.00 41.41 58.60 2.51 5842.75 1775.2 56.6 977.70 N 1481.75 E 6450.00 40.80 59.64 3.67 5861.58 1791.7 56.6 986.14 N 1495.85 E 6475.00 41.95 58.47 5.52 5880.34 1808.2 56.6 994.64 N 1510.02 E 6500.00 41.43 57.41 3.51 5899.01 1824.8 56.6 1003.46 N 1524.11 E 6525.00 39.93 59.26 7.71 5917.97 1841.1 56.7 1012.02 N 1537.98 E 6550.00 41.06 59.10 4.56 5936.99 1857.3 56.7 1020.34 N 1551.92 E 6575.00 41.15 58.68 1.15 5955.82 1873.7 56.7 1028.83 N 1565.99 E 6600.00 41.03 57.99 1.87 5974.67 1890.1 56.7 1037.46 N 1579.98 E 6625.00 40.45 58.79 3.11 5993.61 1906.5 56.7 1046.01 N 1593.87 E 6650.00 40.27 59.92 3.01 6012.66 1922.6 56.7 1054.26 N 1607.80 E 6675.00 41.15 58.82 4.52 6031.61 1938.9 56.8 1062.57 N 1621.83 E 6700.00 40.38 57.56 4.50 6050.55 1955.2 56.8 1071.17 N 1635.70 E 6725.00 39.78 59.41 5.32 6069.68 1971.3 56.8 1079.58 N 1649.42 E 6750.00 40.32 59.76 2.35 6088.81 1987.4 56.8 1087.73 N 1663.29 E 6775.00 40.31 58.71 2.73 6107.88 2003.5 56.8 1096.00 N 1677.19 E 6800.00 40.40 57.96 1.96 6126.93 2019.7 56.8 1104.50 N 1690.96 E 6825.00 40.56 59.99 5.29 6145.94 2035.9 56.9 1112.86N 1744.87 E 6850.00 39.62 58.71 4.98 6165.07 2052.0 56.9 1121.07 N 1718.72 E 6875.00 40.79 58.35 4.75 6184.16 2068.2 56.9 1129.49 N 1732.49 E 6900.00 39.87 59.19 4.28 6203.22 2084.3 56.9 1137.88 N 1746.32 E 6925.00 39.87 59.73 1.39 6222.41 2100.3 56.9. 1146.03 N 1760.12 E A Gyrodata Directional Survey BP Location: Mast Truck. Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 6950.00 40.70 59.85 334 6241.48 2116.5 57.0 1154.16 N 1774.09 E 6975.00 39.77 58.01 6.06 6260.57 2132.6 57.0 1162.49N 1787.92 E 7000.00 39.09 59.28 4.22 6279.87 2148.5 57.0 1170.75 N 1801.48 E 7025.00 39.81 59.26 2.86 6299.18 2164.4 57.0 l 178.87 N 1815.14 E 7050.00 39.94 59.14 0.62 6318.37 2180.4 57.0 1187.08 N 1828.90 E 7075.00 39.32 60.27 3.80 6337.62 2196.3 57.0 1195.12 N 1842.67 E 7100.00 38.76 58.69 4.59 6357.04 2212.0 57.1 1203.12 N 1856.23 E 7125.00 39.19 58.85 1.78 6376.47 2227.8 57.1 1211.27 N 1869.68 E 7150.00 39.44 60.25 3.70 6395.82 2243.6 57. ] 1219.30 N 1883.33 E 7175.00 38.22 59.78 5.03 6415.29 2259.2 57.1 1227.13 N 1896.91 E 7200.00 38.21 58.92 2.14 6434.94 2274.7 57.1 1235.01 N 1910.21 E 7225.00 38.87 59.93 3.67 6454.49 2290.2 57.1 1242.94 N 1923.63 E 7250.00 38.47 58.87 3.12 6474.01 2305.9 57.1 1250.89N 1937.07 E 7275.00 37.41 59.34 4.40 6493.73 ' 2321.2 57.2 1258.78 N 1950.26 E 7300.00 38.03 60.45 3.67 6513.50 2336.5 57.2 1266.45 N 1963.49 E 7325.00 38.41 59.43 2.95 6533.14 2351.9 57.2 1274.20 N 1976.88 E 7350.00 37.29 58.74 4.78 6552.88 2367.3 57.2 1282.08 N 1990.04 E 7375.00 38.62 58.63 5.31 6572.59 2382.6 57.2 1290.07 N 2003.17 E 7400.00 38.41 60.48 4.68 6592.16 2398.2 57.2 1297.96 N 2016.59 E 7425.00 36.89 59.40 6.62 6611.95 2413.5 57.3 1305.61 N 2029.81 E 7450.00 37.98 58.78 4.58 6631.80 2428.6 57.3 1313.42 N 2042.85 E 7475.00 38.00 58.89 0.29 6651.50 2444.0 57.3 1321.38 N 2056.01 E 7500.00 38.06 59.66 1.91 6671.20 2459.4 57.3 1329.25 N 2069.25 E 7525.00 38.00 59.72 0.30 6690.89 2474.8 57.3 1337.02 N 2082.55 E 7550.00 37.67 58.44 3.42 6710.63 2490.1 57.3 1344.90 N 2095.70 E 7575.00 37.96 58.23 1.30 6730.38 2505.4 57.3 1352.95 N 2108.75 E 7600.00 38.46 60.16 5.18 6750.03 2520.9 57.3 1360.86 N 2122.03 E 7625.00 38.23 57.98 5.49 6769.64 2536.4 57.3 1368.83 N 2135.33 E 7650.00 37.30 59.20 4.78 6789.40 2551.7 57.3 1376.81 N 2148.40 E 7675.00 38.66 59.71 5.57 6809.10 2567.1 57.4 1384.63 N 2161.65 E A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 7700.00 37.69 57.26 7.18 6828.76 2582.5 57.4 1392.71 N 2174.82 E 7725.00 37.97 60.29 7.52 6848.51 2597.9 57.4 1400.65 N 2187.93 E 7750.00 37.98 58.50 4.41 6868.22 2613.2 57.4 1408.48 N 2201.17 E 7775.00 38.87 58.34 3.56 6887.80 2628.8 57.4 1416.62 N 2214.40 E 7800.00 37.86 60.22 6.16 6907.40 2644.3 57.4 1424.55 N 2227.74 E 7825.00 38.65 59.59 3.50 6927.03 2659.7 57.4 1432.31 N 2241.13 E 7850.00 38.61 58.14 3.62 6946.56 2675.3 57.4 1440.38 N 2254.49 E 7875.00 39.11 60.33 5.84 6966.03 2691.0 57.4 ] 448.40 N 2267.97 E 7900.00 38.02 59.46 4.86 6985.58 2706.6 57.5 1456.22 N 2281.45 E 7925.00 39.27 58.74 5.29 7005.10 2722.2 57.5 1464.23 N 2294.84 E 7950.00 39.01 60.73 5.12 7024.50 2738.0 57.5 1472.19 N 2308.47 E 7975.00 38.45 60.15 2.66 7044.00 2753.6 57.5 1479.90 N 2322.08 E 8000.00 39.14 59.53 3.18 7063.48 2769.2 57.5 1487.77 N 2335.62 E 8025.00 39.06 60.23 1.81 7082.88 2785.0 57.5 1495.68 N 2349.26 E 8050.00 38.64 61.26 3.09 7102.36 2800.6 57.5 1503.35 N 2362.94 E 8075.00 39.06 61.86 2.26 7121.83 2816.3 57.6 1510.82 N 2376.73 E 8100.00 38.96 60.17 4.26 7141.25 2832.0 57.6 1518.44 N 2390.49 E 8125.00 38.08 61.81 5.40 7160.81 2847.5 57.6 1525.99N 2404.11 E 8150.00 39.02 62.61 4.27 7180.36 2863.1 57.6 1533.26 N 2417.89 E 8175.00 39.10 60.80 4.56 7199.77 2878.8 57.6 1540.72 N 2431.76 E 8200.00 37.72 62.30 6.65 7219.36 2894.3 57.7 1548.13 N 2445.42 E 8225.00 38.87 62.71 4.70 7238.98 2909.7 57.7 1555.28 N 2459.16 E 8250.00 38.46 62.15 2.19 7258.50 2925.3 57.7 1562.51 N 2473.00 E 8275.00 38.67 60.71 3.69 7278.05 2940.8 57.7 1569.96N 2486.69 E 8300.00 39.16 62.72 5.41 7297.50 2956.5 57.8 1577.40 N 2500.52 E 8325.00 37.66 63.15 6.10 7317.09 2972.0 57.8 1584.47 N 2514.35 E 8350.00 38.58 61.00 6.47 7336.76 2987.3 57.8 1591.70 N 2527.98 E 8375.00 38.92 63.29 5.89 7356.26 3002.9 57.8 1599.01 N 2541.82 E 8400.00 37.74 62.91 4.84 7375.87 3018.4 57.9 1606.02 N 2555.64 E 8425.00 38.43 61.43 4.58 7395.55 3033.8 57.9 1613.22N 2569.28 E A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 8450.00 38.48 62.93 3.73 7415.12 3049.3 57.9 1620.47 N 2583.03 E 8475.00 37.23 63.48 5.16 7434.86 3064.5 57.9 1627.39 N 2596.72 E 8500.00 37.51 61.49 4.97 7454.73 3079.7 57.9 1634.40 N 2610.18 E 8525.00 37.73 62.58 2.79 7474.53 3094.9 58.0 1641.56 N 2623.66 E 8550.00 37.00 64.24 4.98 7494.40 3110.0 58.0 1648.35 N 2637.22 E 8575.00 37.63 62.62 4.67 7514.29 3125.1 58.0 1655.13 N 2650.78 E 8600.00 37.76 62.23 1.08 7534.07 3140.3 58.0 1662.21 N 2664.33 E 8625.00 37.69 64.29 5.05 7553.84 3155.5 58.1 1669.09 N 2677.99 E 8650.00 36.77 62.72 5.27 7573.75 3170.6 58. l 1675.84 N 2691.52 E 8675.00 37.71 62.64 3.74 7593.65 3185.7 58.1 1682.78 N 2704.97 E 8700.00 36.82 64.20 5.20 7613.55 3200.8 58.1 1689.55 N 2718.50 E 8725.00 36.33 63.21 3.07 7633.62 3215.6 58.2 1696.15 N 2731.85 E 8750.00 36.85 62.44 2.78 7653.70 3230.4 58.2 1702.96 N 2745.11 E 8775.00 36.56 65.31 6.97 7673.74 3245.3 58.2 1709.54 N 2758.52 E 8800.00 36.71 62.80 6.01 7693.81 3260.1 58.2 1716.06 N 2771.93 E 8825.00 35.71 63.37 4.20 7713.98 3274.9 58.3 1722.75 N 2785.10 E 8850.00 36.28 65.16 4.79. 7734.20 3289.5 58.3 1729.13 N 2798.33 E 8875.00 35.96 63.00 5.25 7754.40 3304.1 58.3 1735.57N 2811.59 E 8900.00 36.32 64.25 3.28 7774.59 3318.8 58.3 1742.12 N 2824.80 E 8925.00 35.73 65.82 4.37 7794.81 3333.4 58.4 1748.32 N 2838.12 E 8950.00 34.89 64.96 3.93 7815.21 3347.7 58.4 1754.34 N 2851.26 E 8975.00 35.49 64.39 2.74 7835.64 3362.1 58.4 1760.50 N 2864.28 E 9000.00 35.74 67.14 6.49 7855.97 3376.5 58.5 1766.48 N 2877.55 E 9025.00 34.45 66.50 5.39 7876.42 3390.7 58.5 1772.13 N 2890.77 E 9050.00 35.11 64.49 5.31 7896.96 3404.9 58.5 1778.05 N 2903.74 E 9075.00 33.81 63.01 6.20 7917.57 3419.0 58.5 1784.30 N 2916.43 E 9100.00 32.97 60.20 7.04 7938.44 3432.7 58.6 1790.84 N 2928.53 E 9125.00 33.21 58.34 4.16 7959.39 3446.3 58.6 1797.81 N 2940.26 E 9150.00 33.03 56.61 3.86 7980.33 3460.0 58.6 1805.16 N 2951.78 E 9175.00 33.38 55.52 2.77 8001.24 3473.7 58.5 1812.80N 2963.14 E s • A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27. Job Number: AK0208G MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 9200.00 33.69 54.96 1.76 8022.08 3487.5 58.5 1820.68 N 2974.48 E 9225.00 34.46 54.82 3.08 8042.79 3501.4 58.5 ] 828.74 N 2985.94 E 9250.00 34.40 56.53 3.89 8063.41 3515.6 58.5 1836.71 N 2997.61 E 9275.00 35.26 54.30 6.17 8083.93 3529.8 58.5 1844.81 N 3009.37 E 9300.00 35.22 56.50 5.08 8104.35 3544.2 .58.5 1853.00 N 3021.24 E 9325.00 35.60 56.26 1.59 8124.73 3558.7 58.5 1861.02 N 3033.30 E 9350.00 36.44 56.43 3.40 8144.95 3573.4 58.5 1869.17 N 3045.54 E 9375.00 36.24 56.54 0.83 8165.09 3588.2 58.5 1877.35 N 3057.89 E 9400.00 36.26 58.23 4.00 8185.25 3603.0 58.4 1885.32 N 3070.34 E 9425.00 36.14 58.00 0.73 8205.42 3617.7 58.4 1893.12 N 3082.88 E 9450.00 36.50 58.40 1.72 8225.56 3632.5 58.4 1900.92 N 3095.46 E 9475.00 36.73 59.27 2.27 8245.63 3647.5 58.4 1908.64 N 3108.22 E 9500.40 36.75 59.42 0.38 8265.66 3662.4 58.5 1916.26N 3121.09 E 9525.00 36.13 60.36 3.33 8285.77 3677.3 58.5 1923.71. N 3133.93 E 9550.00 36.03 60.97 1.50 8305.98 3692.0 58.5 1930.92 N 3146.77 E 9575.00 36.45 61.60 2.25 8326.14 3706.7 58.5 1938.02 N 3l 59.73 E 9600.00 36.60 62.09 1.32 8346.24 3721.6 58.5 1945.04 N 3172.85 E 9625.00 36.49 62.32 0.68 8366.32 3736.4 58.5 1951.99N 3186.02 E 9650.00 36.38 62.81 1.24 8386.43 3751.2 58.5 1958.83 N 3199.19 E 9675.00 36.22 63.38 1.48 8406.58 3766.0 58.5 1965.53 N 3212.39 E 9700.00 35.95 64.17 2.17 8426.78 3780.7 58.6 1972.03 N 3225.60 E 9725.00 35.88 65.33 2.72 8447.03 3795.2 58.6 1978.29 N 3238.86 E 9750.00 36.51 65.88 2.82 8467.21 3809.9 58.6 1984.39 N 3252.31 E 9775.00 37.36 65.40 3.60 8487.19 3824.8 58.6 1990.58 N 3265.99 E 9800.00 37.33 65.12 0.69 8507.06 3839.9 58.7 1996.93 N 3279.77 E 9825.00 37.24 65.59 1.18 8526.95 3854.9 58.7 2003.24 N 3293.53 E 9850.00 37.72 65.75 1.94 8546.79 3870.0 58.7 2009.51 N 3307.39 E 9875.00 37.95 65.54 1.07 8566.54 3885.2 58.7 2015.84 N 3321.36 E 9900.00 38.14 65.36 0.85 8586.23 3900.5 58.8 2022.24 N 3335.38 E 9925.00 38.56 64.95 1.96 8605.83 3916.0 58.8 2028.75 N 3349.45 E ~ ~ A Gyrodata Directional Survey BP Location: Mast Truck, Lease: F PAD Well: F-27, Job Number: AK0208G 111 MEASURED I N C LAZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 9950.00 38.90 64.82 1.41 8625.34 3931.5 58.8 2035.39N 3363.61 E 9975.00 39.17 64.30 1.69 8644.76 3947.2 58.8 2042.16 N 3377.83 E 10000.00 39.62 64.38 1.81 8664.08 3963.0 58.9 2049.03 N 3392.13 E 10025.00 39.56 63.82 1.44 8683.34 3978.8 58.9 2055.99 N 3406.47 E 10050.00 39.43 62.99 2.16 8702.63 3994.7 58.9 2063.11 N 3420.68 E 10075.00 39.29 63.78 2.06 8721.96 4010.5 58.9 2070.21 N 3434.86 E 10100.00 39.69 63.10 2.36 8741.25 4026.3 58.9 2077.32 N 3449.08 E 10125.00 39.79 62.71 1.06 8760.48 4042.3 59.0 2084.60 N 3463.31 E 10150.00 39.99 62.29 1.35 8779.66 4058.3 59.0 2092.00 N 3477.53 E 10175.00 40.13 62.58 0.93 8798.79 4074.3 59.0 2099.45 N 3491.79 E 10200.00 40.18 61.73 2.22 8817.90 4090.4 59.0 2106.98 N 3506.05 E 10225.00 40.15 62.26 1.37 8837.01 4106.5 59.0 2114.55 N 3520.28 E 10250.00 39.89 61.29 2.69 8856.15 4122.6 59.0 2122.15 N 3534.45 E 10275.00 40.09 61.46 0.92 8875.31 4138.7 59.0 2129.85 N 3548.55 E 10300.00 40.26 61.99 1.51 8894.41 4154.8 59.0 2137.49N 3562.75 E 10325.00 40.40 60.91 2.86 8913.47 4170.9 59.0 2145.22 N 3576.96 E 10350.00 40.66 61.01 1.06 8932.47 4187.2 59.1 2153.11 N 3591.17 E 10375.00 40.71 60.32 1.82 8951.43 4203.5 59.1 2161.09N 3605.38 E 10400.00 40.72 60.23 0.23 8970.37 4219.8 59.1 2169.18 N 3619.54 E 10425.00 43.35 61.11 10.78 8988.94 4236.5 59.1 2177.37 N 3634.13 E 10450.00 49.36 63.49 25.01 9006.19 4254.5 59.1 2185.76 N 3650.15 E 10475.00 57.07 64.28 30.93 9021.15 4274.5 59.1 2194.56 N 3668.12 E 10500.00 64.49 68.91 33.81 9033.35 4296.1 59.1 2203.19 N 3688.13 E 10525.00 71.27 71.68 28.97 9042.76 4318.8 59.2 2210.98 N 3709.92 E 10537.13 73.87 72.87 23.39 9046.40 4330.1 59.2 2214.50 N 3720.95 E Final Station Closure: Distance: 4330.06 ft Az: 59.24 deg. Survey QC - RGS-CT Analysis Sheet SURVEY QUALITY CONTROL -DATA ANALYSIS RFFFRFNf F CYCTFMc Grid 5 stem Grid Correction 0.00 Azimuth reference: Grid /True North TRUE NORTH Vertical reference: RKB/MSL/Other RKB If other ive details TIE ON DATA De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0,00 Northin s 0.00 Eastin s O.OG Latitude 70.2010 Az. Ref: Grid/True Grid Corrected Y N? Descri tion CALIBRATION Tool Number 6007 Calibration Date 31 Jul 2007 OPERATING TEMPERATURE Calibration ran e From 47.31 To 120.39 G ro o eratin ran e From 85.52 To 96.25 Spec' -Within calibration range FTFI D Rnt 1 TFCT //lnly ~I~.i n R..~,.1 .-}.. yen... Cal value ___ _-. __- Pre ~ob offset _. __. ._.._.. ...~~ Post ob offset ..........~ ~.~ ..~ ~.,~~ Abs dif.cal. ost «..ai .,u~ta O~VI IIICU Abs dif. re. ost OI LCI IClUlll lV UODC Sec' Accel Scale 0.000000 0.000000 N A Cal/Post - 0.00015 Mass Unbalance 0.00 0.00 N/A Pre/Post - 0.4°/hr INITIAITSATTnN De th A rox 3449.90 No of stns 11 Sec' -Min No. - 6 Azimuth Mean 55.00 Std deviation 0.04 Sec' - Azi SD 0.2° Inclination Mean 14.38 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.0555 Std deviation 0.01 5 ec' -See 167 DRIFT TUNE Residual x ro bias Mean -0.000 Std dev' 0.002 Sec's -Mean and SD - 0.333~/hr Residual ro bias Mean 0.001 Std dev' 0.002 Sec's -Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 38.10 Sec' - 400° sec TN /f111T ('AMDA QTCAN fA7r' w~/A rc rw~n. r°~ Inclination Difference Mean -0.01 Std dev' 0.19 Sec's -Casin 0.3°/Drill i e 0.3° Azimuth Difference Mean 0.18 Std dev' 0.33 5 ec's -Casin 0.5°/Drill i e 0.75° Lateral Diver ence/1000 1.89 Sec - 5.0/1000 Vertical Diver ence/1000 0.09 Sec' - 2.0/1000 DEPTH C('1NTRM Wireline Com an Schlumber er Line e 15/32 Encoder SF Schlumber er Max De th TD 10537.1 CCL Corrected Yes Zero De th Ri u 38.41 ft Base flan a 67.9 ft AMSL Rezero De th 4.4 Given u oint de th 8083.29 Measured PJ 8078.54 Strech cor. At TD divided b TD 1000 .67 Sec' - 1.5/1000 Dif. Between ri u and rezero de the divided b TD 1000 .42 Sec' - 2.0/1000 Dif. Between iven and meas de th divided b meas 1000 .45 Sec' - 2.0/1000 SURV-Q165 (OPS SUR-MA-030) 22"" Jan 2004 /Revision 20 Page 1 of 1 AK0208G 111 Survey QC - RGS-CTS cification Sheet ~. SURVEY QUALITY CONTROL -SPECIFICATION DATA INITIALISATION Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERNeas-ERrneo) 57 14.38 54.95 0.0531 58 14.38 54.94 0.0475 59 14.38 55.00 0.0586 60 14.38 55.03 0.0703 61 14.38 55.01 0.0645 62 14.38 55.00 0.0630 63 14.38 54.97 0.0468 64 14.38 55.07 0.0421 65 14.39 55.02 0.0562 66 14.39 54.98 0.0640 67 14.39 55.03 0.0438 Average 14.38 55.00 0.0555 Tolerance on Average* 0.0840 Standard Deviation 0.00 0.04 0.0090 Tolerance on St. Dev.** 0.1° 0.2° 0.0400 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * v[(CosA*57nI*0.1)Z+n nay] o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/COST) *v[(CosA*Sinl*0.1)Z+(O.OSz/(n-1))] ~/hr DRIFT TUNES Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1442.46 5795.79 40.34 58.23 0.000 0.000 0.000 0.000 2 1199.69 7541.09 38.21 60.33 0.002 -0.002 -0.001 0.001 3 350.00 7561.08 38.46 57.97 0.005 -0.005 -0.001 0.002 4 1366.53 9289.90 34.92 55.11 -0.001 0.001 -0.001 0.002 5 1078.07 10548.18 74.11 72.87 0.000 0.000 0.000 0.000 6 1002.33 9289.64 34.92 55.65 0.000 0.001 0.000 -0.000 7 379.94 9146.71 33.40 57.14 0.002 -0.002 0.002 -0.002 8 1305.84 7562.08 38.10 58.66 0.000 0.001 0.000 0.000 9 1229.91 5794.36 40.95 58.04 -0.000 0.000 -0.004 0.004 10 516.37 5370.32 37.97 56.12 -0.003 0.004 0.002 -0.001 11 1427.08 3448.16 14.60 56.50 0.000 0.000 0.000 0.000 Average 0.000 -0.000 -0.000 0.001 Standard Deviation 0.002 0.002 0.002 0.002 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev IS Page 1 of 9 AK0208G_lil Survey QC - RGS-CTS ecification Sheet tip .~® INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.13 0.20 -0.06 67.26 127.08 -59.82 200.00 0.26 0.25 0.02 133.96 134.89 -0.93 300.00 0.33 0.27 0.06 149.77 152.69 -2.92 400.00 0.40 0.43 -0.03 165.45 159.37 6.08 500.00 0.45 0.47 -0.03 169.55 174.93 -5.38 600.00 0.49 0.45 0.04 173.68 174.27 -0.59 700.00 0.52 0.43 0.09 180.87 170.08 10.79 800.00 0.56 0.55 0.01 188.06 187.59 0.47 900.00 0.59 0.57 0.02 194.71 195.09 -0.38 1000.00 0.63 0.60 0.03 201.23 201.86 -0.63 1100.00 0.60 0.63 -0.03 197.42 203.34 -5.92 1200.00 0.58 0.63 -0.05 193.58 194,42 -0.84 1300.00 0.75. 0.86 -0.11 188.45 179.20 9.25 1400.00 0.92 0.95 -0.04 183.37 183.91 -0.54 1500.00 0.99 0.99 -0.01 183.04 183.09 -0.05 1600.00 1.06 1.09 -0.03 182.76 186.78 -4.01 1700.00 1.21 1.19 0.03 187.10 188.80 -1.69 1800.00 1.37 1.35 0.02 191.58 194.31 -2.74 1900.00 1.42 1.53 -0.11 208.25 206.96 1.29 2000.00 1.47 1.52 -0.05 224.76 224.61 0.15 2100.00 1.42 1.32 0.09 227.08 228.42 -1.34 2200.00 1.36 1.30 0.06 229.30 227.59 1.72 2300.00 1.17 1.17 0.00 222.27 225.04 -2.77 2400.00 0.99 0.95 0.03 215.11 217.34 -2.23 2500.00 1.16 1.06 0.10 195.78 185.92 9.86 2600.00 1.32 1.32 0.00 176.62 176.58 0.04 2700.00 1.40 1.45 -0.05 172.48 170.39 2.09 2800.00 1.51 1.44 0.06 167.70 162.39 5.31 2900.00 3.78 3.34 0.44 104.12 76.85 27.27 3000.00 6.04 5.81 0.23 41.28 40.43 0.85 3100.00 8.17 8.41 -0.25 46.72 36.59 10.13 3200.00 10.28 10.23 0.05 52.10 50.82 1.28 3300.00 11.67 11.52 0.16 52.68 53.27 -0.59 3400.00 13.09 13.12 -0.04 53.30 54.21 -0.91 3425.00 13.76 13.73 0.03 54.19 54.74 -0.55 3450.00 14.44 14.41 0.04 54.93 55.38 -0.45 3475.00 14.70 15.11 -0.41 54.35 54.22 0.14 3500.00 15.54 15.47 0.07 54.87 55.10 -0.23 3525.00 15.83 16.26 -0.43 53.46 53.47 -0.01 3550.00 16.76 16.68 0.09 53.88 53.69 0.19 3575.00 17.21 17.66 -0.45 52.26 52.94 -0.68 3600.00 18.14 18.15 -0.01 53.47 53.14 0.33 3625.00 19.15 19.38 -0.23 52.37 53.24 -0.86 SURV-Q367 (OPS SUR-MA-003) 19~b Nov 03 /Rev IS Page 2 of 9 AK0208G 111 Survey QC - RGS-CT ecification Sheet .rs 3650.00 19.82 19.93 -0.12 52.94 52.69 0.24 3675.00 20.82 20.92 -0.10 52.49 53.28 -0.79 3700.00 21.10 21.34 -0.25 52.83 52.38 0.45 3725.00 22.08 22.12 -0.04 53.04 53.53 -0.49 3750.00 22.43 22.68 -0.25 53.33 53.28 0.04 3775.00 23.31 23.36 -0.05 54.15 54.34 -0.19 3800.00 24.42 24.80 -0.38 53.30 53.52 -0.23 3825.00 25.40 25.50 -0.10 54.33 54.25 0.08 3850.00 26.07 26.24 -0.18 53.81 53.94 -0.13 3875.00 26.15 26.25 -0.10 54.03 54.13 -0.10 3900.00 26.97 27.12 -0.16 54.56 54.57 -0.01 3925.00 27.01 27,10 -0.09 54.08 54.17 -0.10 3950.00 27.59 27.83 -0.23 54.86 54.78 0.08 3975.00 28.41 28.51 -0.10 53.71 53.70 0.01 4000.00 28.89 29.14 -0.24 54.17 54.26 -0.08 4025.00 30.17 30.30 -0.13 53.64 53.63 0..02 4050.00 30.50 30.68 -0.18 54.14 54.24 -0.10 4075.00 31.40 31.55 -0.15 54.30 53.99 0.31 4100.00 31.87 31.93 -0.06 53.98 54.18 -0.21 4125.00 32.28 32.47 -0.20 54.58 54.36 0.22 4150.00 32.31 32.38 -0.07 53.68 53.65 0.03 4175.00 32.80 32.87 -0.07 53.59 53.59 -0.01 4200.00 32.63 32.86 -0.23 52.68 52.51 0.17 4225.00 33.52. 33.45 0.07 53.04 53.13 -0.09 4250.00 34.02 34.44 -0.42 52.88 52.74 0.14 4275.00 34.91 34.76 0.15 53.49 53.43 0.06 4300.00 35.44 35.88 -0.44 53.43 53.51 -0.07 4325.00 36.27 36.09 0.18 53.78 53.52 0.27 4350.00 36.51 36.95 -0.44 53.56 53.70 -0.14 4375.00 37.46 37.36 0.10 54.09 53.63 0.46 4400.00 37.78 38.01 -0.23 54.02 54.40 -0.38 4425.00 38.77 38.91 -0.14 54.70 54.23 0.46 4450.00 39.27 39.32 -0.05 54.66 54.80 -0.14 4475.00 39.36 39.49 -0.13 54.93 54.67 0.26 4500.00 38.83 38.76 0.08 54.34 54.32 0.01 4525.00 38.97 39.04 -0.07. 54.78 54.67 0.11 4550.00 38.92 39.11 -0.19 54.25 54.13 0.12 4575.00 39.14 38.95 0.20 55.17 54.97 0.20 4600.00 39.03 39.23 -0.20 54.61 54.75 -0.14 4625.00 39.23 39.30 -0.06 55.03 54.49 0.54 4650.00 38.82 38.67 0.15 55.06 55.25 -0.20 4675.00 38.92 39.34 -0.42 55.05 54.77 0.28 4700.00 38.97 38.71 0.26 55.26 55.07 0.18 4725.00 38.84 39.20 -0.35 55.32 55.51 -0.19 4750.00 38.78 38.63 0.16 55.66 55.23 0.43 SURV-Q367 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 3 of 9 AKO2O8G 111 Survey QC - RGS-CT cification Sheet s~ 4 i i5. UU 38.77 38.96 -0.19 55.45 55.87 -0.42 4800.00 39.06 39.09 -0.03 55.88 55.34 0.54 4825.00 38.34 38.43 -0.09 55.44 55.51 -0.07 4850.00 38.86 38.97 -0.11 55.17 54.94 0.23 4875.00 38.52 38.55 -0.02 54.90 54.94 -0.03 4900.00 38.49 38.47 0.02 55.59 55.61 -0.02 4925.00 38.57 38.83 -0.26 54.49 54.33 0.17 4950.00 38.56 38.35 0.21 55.26 55.04 0.22 4975.00 38.26 38.60 -0.34 55.12 55.24 -0.12 5000.00 38.81 38.66 0.16 55.35 54.99 0.37 5025.00 38.54 38.80 -0.26 55.44 55.75 -0.32 5050.00 39.04 39.08 -0.03 55.96 55.49 0.46 5075.00 38.74 38.79 -0.06 55.89 55.44 0.45 5100.00 39.01 39.03 -0.02 55.80 56.17 -0.37 5125.00 38.86 38.98 -0.13 56.91 56.07 0.85 5150.00 38.82 38.68 0.14 55.11 55.47 -0.36 5175.00 38.73 38.85 -0.11 55.84 55.41 0.43 5200.00 38.45 38.50 -0.05 56.42 56.27 0.15 5225.00 38.27 38.29 -0.02 54.92 54.84 0.08 5250.00 37.81 37.85 -0.04 55.55 54.91 0.65 5275.00 37.76 37.86 -0.10 56.07 56.51 -0.44 5300.00 38.27 38.33 -0.06 55.61 55.14 0.47 5325.00 38.12 38.11 0.01 55.22 54.82 0.40 5350.00 38.05 38.31 -0.26 55.97 56.24 -0.26 5375.00 38.36 38.19 0.17 55.84 55.38 0.46 5400.00 38.05 38.09 -0.04 55.54 55.35 0.19 5425.00 38.30 38.54 -0.23 55.19 54.88 0.31 5450.00 38.53 38.20 0.33 55.70 55.63 0.07 5475.00 38.61 38.80 -0.20 57.14 56.61 0.53 5500.00 39.10 39.13 -0.03 55.84 55.52 0.31 5525.00 39.76 39.58 0.17 56.07 56.28 -0.21 5550.00 39.85 39.86 -0.01 57.73 56.89 0.83 5575.00 39.60 39.55 0.04 56.53 56.38 0.15 5600.00 39.78 39.77 0.02 55.73 55.75 -0.02 5625.00 39.67 39.35 0.33 57.57 57.05 0.52 5650.00 39.64 39.81 -0.17 57.11 56.88 0.23 5675.00 40.26 40.27 -0.01 55.75 55.48 0.27 5700.00 40.62 40.18 0.43 57.43 57.31 0.12 5725.00 40.59 40.70 -0.12 57.36 56.74 0.62 5750.00 40.49 40.41 0.09 55.91 55.62 0.29 5775.00 40.76 40.49 0.28 57.09 57.40 -0.31 5800.00 40.84 40.71 0.13 58.02 57.33 0.68 5825.00 40.89 40.72 0.17 56.90 56.42 0.48 5850.00 40.81 40.84 -0.03 57.32 57.44 -0.12 5875.00 40.88 40.51 0.37 58.14 57.69 0.45 SURV-Q367 (OPS SU R-MA-003) 19`" Nov 03 /Rev 15 Page 4 of 9 AK0208G 111 Survey QC - RGS-CT cification Sheet 5900.00 41.10 40.80 0.30 58.30 58.05 0.26 5925.00 40.75 41.00 -0.25 57.47 56.99 0.48 5950.00 41.19 40.86 0.33 57.51 57.48 0.03 5975.00 41.09 40.91 0.17 58.89 58.80 0.08 6000.00 41.26 41.23 0.02 58.46 57.54 0.91 6025.00 41.47 41.34 0.13 57.49 57.43 0.06 6050.00 41.29 41.24 0.05 58.70 58.70 -0.00 6075.00 41.57 41.22 0.34 58.86 58.21 0.65 6100.00 41.21 41.25 -0.04 57.91 57.74 0.17 6125.00 41.12 41.23 -0.11 58.46 58.20 0.26 6150.00 41.48 41.06 0.42 58.21 57.95 0.26 6175.00 41.27 41.27 -0.00 59.61 59.20 0.41 6200.00 41.05 41.12 -0.06 59.02 58.41 0.61 6225.00 41.24 40.90 0.34 57.79 57.95 -0.16 6250.00 41.50 41.48 0.03 59.32 58.91 0.41 6275.00 41.28 41.22 0.06 59.07 58.38 0.68 6300.00 40.84 40.80 0.04 57.63 57.94 -0.31 6325.00 42.05 41.99 0.06 58.03 57.54 0.49 6350.00 41.59 41.37 0.22 59.67 59.03 0.64 6375.00 40.27 40.49. -0.22 58.31 58.36 -0.05 6400.00 41.45 41.27 0.18 57.65 57.18 0.47 6425.00 41.41 41.09 0.32 58.60 58.28 0.32 6450.00 40.80 41.16 -0.36 59.64 59.27 0.37 6475.00 41.95 41.70 0.25 58.47 58.25 0.22 6500.00 41.43 41.31 0.12 57.41 57.27 0.14 6525.00 39.93 40.13 -0.20 59.26 58.53 0.73 6550.00 41.06 40.93 0.13 59.10 59.34 -0.25 6575.00 41.15 40.90 0.25 58.68 58.04 0.64 6600.00 41.03 40.95 0.07 57.99 57.27 0.72 6625.00 40.45 40.15 0.30 58.79 58.92 -0.13 6650.00 40.27 40.40 -0.13 59.92 59.29 0.63 6675.00 41.15 41.21 -0.07 58.82 58.35 0.47 6700.00 40.38 40.17 0.21 57.56 57.69 -0.13 6725.00 39.78 39.86 -0.08 59.41 58.61 0.80 6750.00 40.32 40.37 -0.05 59.76 59.47 0.29 6775.00 40.31 40.35 -0.04 58.71 58.73 -0.02 6800.00 40.40 40.24 0.16 57.96 57.23 0.73 6825.00 40.56 40.10 0.46 59.99 59.51 0.48 6850.00 39.62 39.68 -0.06 58.71 58.60 0.11 6875.00 40.79 40.81 -0.02 58.35 57.43 0.92 6900.00 39.87 39.89 -0.03 59.19 59.10 0.09 6925.00 39.87 39.97 -0.10 59.73 59.67 0.07 6950.00 40.70 40.67 0.03 59.85 58.98 0.87 6975.00 39.77 39.83 -0.06 58.01 57.91 0.10 7000.00 39.09 39.23 -0.14 59.28 59.15 0.12 SURV-Q167 (OPS SU R-MA-003) 19`" Nov 03 /Rev 15 Page 5 of 9 AK0208G 111 Survey QC - RGS-CT ecification Sheet 7025.00 39.81 39.70 0.11 59.26 58.48 0.78 7050.00 39.94 40.11 -0.17 59.14 59.24 -0.10 7075.00 39.32 39.44 -0.12 60.27 59.97 0.30 7100.00 38.76 38.63 0.12 58.69 57.92 0.77 7125.00 39.19 39.41 -0.22 58.85 58.89 -0.05 7150.00 39.44 39.58 -0.14 60.25 60.09 0.16 7175.00 38.22 38.06 0.15 59.78 59.09 0.69 7200.00 38.21 38.42 -0.22 58.92 58.90 0.02 7225.00 38.87 39.16 -0.28 59.93 59.82 0.12 7250.00 38.47 38.57 -0.10 58.87 58.05 0.82 7275.00 37.41 37.31 0.10 59.34 59.01 0.33 7300.00 38.03 38.53 -0.50 60.45 60.25 0.19 7325.00 38.41 38.30 0.11 59.43 58.80 0.63 7350.00 37.29 37.47 -0.18 58.74 58.51 0.22 7375.00 38.62 38.86 -0.24 58.63 58.60 0.03 7400.00 38.41 38.33 0.08 60.48 59.82 0.66 7425.00 36.89 37.21 -0,31 59.40 59.56 -0.17 7450.00 37.98 38.13 -0.15 58.78 58.27 0.51 7475.00 38.00 38.01 -0.02 58.89 58.25 0.64 7500.00 38.06 38.35 -0.29 .59.66 59.53 0.13 7525.00 38.00 38.05 -0.05 59.72 59.50 0.22 7550.00 37.67 37.64 0.03 58.44 57.93 0.51 7575.00 37.96 38.26 -0.29 58.23 58.58 -0.35 7600.00 38.46 38.51 -0.05 60.16 59.58 0.58 7625.00 38.23 38.36 -0.13 57.98 57.67 0.31 7650.00 37.30 37.39 -0.09 59.20 59.48 -0.29 7675.00 38.66 38.97 -0.31 59.71 58.94 0.77 7700.00 37.69 37.51 0.17 57.26 57.31 -0.06 7725.00 37.97 38.06 -0.10 60.29 60.09 0.20 7750.00 37.98 38.32 -0.33 58.50 58.13 0.37 7775.00 38.87 38.60 0.27 58.34 58.30 0.04 7800.00 37.86 38.17 -0.31 60.22 59.74 0.48 7825.00 38.65 38.67 -0.03 59.59 59.45 0.14 7850.00 38.61 38.48 0.12 58.14 58.20 -0.05 7875.00 39.11 39.48 -0.36 60.33 59.79 0.54 7900.00 38.02 37.83 0.19 59.46 59.56 -0.10 7925.00 39.27 39.35 -0.08 58.74 58.48 0.26 7950.00 39.01 39.13 -0.12 60.73 60.30 0.43 7975.00 38.45 38.21 0.24 60.15 60.48 -0.33 8000.00 39.14 39.30 -0.16 59.53 58.85 0.68 8025.00 39.06 39.11 -0.06 .60.23 60.05 0.18 8050.00 38.64 38.55 0.09 61.26 61.46 -0.20 8075.00 39.06 39.23 -0.17 61.86 61.06 0.79 8100.00 38.96 38.88 0.08 60.17 60.15 0.02 8125.00 38.08 38.16 -0.08 61.81 61.57 0.24 SURV-Q167 (OPS SUR-MA-003) 19~b Nov 03 /Rev 15 Page 6 of 9 AK0208G 111 Survey QC - RGS-CTS ecification Sheet ,~ ~~ 8150.00 39.02 39.21 -0.18 62.61 62.12 0.48 8175.00 39.10 38.91 0.19 60.80 60.87 -0.07 8200.00 37.72 38.07 -0.34 62.30 61.61 0.69 8225.00 38.87 38.70 0.17 62.71 62.70 0.01 8250.00 38.46 38.56 -0.10 62.15 61.79 0.35 8275.00 38.67 38.90 -0.23 60.71 60.33 0.38 8300.00 39.16 38.87 0.29 62.72 62.45 0.27 8325.00 37.66 38.01 -0.35 63.15 62.95 0.20 8350.00 38.58 38.45 0.14 61.00 60.61 0.39 8375.00 38.92 38.84 0.08 63.29 62.77 0.52 8400.00 37.74 37.85 -0.12 62.91 63.00 -0.09 8425.00 38.43 38.24 0.18 61.43 60.65 0.79 8450.00 38.48 38.43 0.05 62.93 63.01 -0.08 8475.00 37.23 37.24 -0.01 63.48 63.11 0.37 8500.00 37.51 37.54 -0.02 61.49 60.94 0.54 8525.00 37.73 37.51 0.22 62.58 62.69 -0.11 8550.00 37.00 37.24 -0.24 64.24 .63.43 0.81 8575.00 37.63 37.38 0.26 62.62 62.51 0.10 8600.00 37.76 37.66 0.10 62.23 61.93 0.30 8625.00 37.69 37.92 -0.23 64.29 63.76 0.52 8650.00 36.77 36.35 0.43 62.72 62.45 0.27 8675.00 37.71 37.92 -0.21 62.64 62.31 0.32 8700.00 36.82 36.72 0.09 64.20 63.87 0.32 8725.00 36.33 36.04 0.29 63.21 62.71 0.49 8750.00 36.85 36.93 -0.08 62.44 62.42 0.01 8775.00 36.56 36.20 0.35 65.31 64.58 0.73 8800.00 36.71 36.82 -0.11 62.80 62.88 -0.08 8825.00 35.71 35.61 0.10 63.37 62.90 0.46 8850.00 36.28 36.17 0.10 65.16 64.55 0.62 8875.00 35.96 35.76 0.20 63.00 63.34 -0.34 8900.00 36.32 36.35 -0.03 64.25 63.42 0.83 8925.00 35.73 35.61 0.13 65.82 65.54 0.28 8950.00 34.89 34.47 0.42 64.96 64.70 0.27 8975.00 35.49 35.67 -0.19 64.39 64.25 0.14 9000.00 35.74 35.61 0.14 67.14 66.47 0.66 9025.00 34.45 34.32 0.13 66.50 65.93 0.57 9050.00 35.11 34.91 0.21 64.49 64.82 -0.33 9075.00 33.81 33.86 -0.05 63.01 62.24 0.77 9100.00 32.97 32.77 0.20 60.20 60.00 0.20 9125.00 33.21 32.73 0.48 58.34 58.01 0.34 9150.00 33.03 33.12 -0.09 56.61 56.94 -0.33 9175.00 33.38 33.15 0.23 55.52 55.25 0.27 9200.00 33.69 33.57 0.13 54.96 54.61 0.34 9225.00 34.46 34.03 0.43 54.82 55.32 -0.50 9250.00 34.40 34.64 -0.24 56.53 56.30 0.23 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 7 Of 9 AK0208G_lll Survey QC - RGS-CT ecification Sheet 9275.00 35.26 35.15 0.12 54.30 54.19 0.11 9300.00 35.22 35.16 0.06 56.50 55.99 0.51 9325.00 35.60 35.56 0.04 56.26 56.91 -0.64 9350.00 36.44 36.53 -0.09 56.43 56.11 0.32 9375.00 36.24 36.44 -0.20 56.54 56.40 0.14 9400.00 36.26 35.89 0.37 58.23 5$.13 0.10 9425.00 36.14 36.18 -0.04 58.00 58.20 -0.20 9450.00 36.50 36.50 -0.00 58.40 58.35 0.05 9475.00 36.73 36.45 0.27 59.27 59.28 -0.02 9500.00 36.75 37.04 -0.29 59.42 59.85 -0.43 9525.00 36.13 36.38 -0.24 60.36 59.93 0.43 9550.00 36.03 36.02 0.01 60.97 60.77 0.20 9575.00 36.45 36.60 -0.15 61.60 61.54 0.06 9600.00 36.60 36.46 0.13 62.09 61.68 0.42 9625.00 36.49 36.24 0.26 62.32 62.68 -0.36 9650.00 36.38 36.53 -0.15 62.81 63.22 -0.42 9675.00 36.22 36.23 -0.00 63.38 63.42 -0.05 9700.00 35.95 36.08 -0.12 64.17 64.58 -0.40 9725.00 35.88 36.23 -0.34 65.33 65.12 0.21 9750.00 36.51 36.42 0.09 65.88 65.42 0.46 9775.00 37.36 37.17 0.19 65.40 65.79 -0.38 9800.00 37.33 37.63 -0.30 65.12 65.47 -0.34 9825.00 37.24 37.48 -0.24 65.59 65.25 0.34 9850.00 37.72 37.68 0.04 65.75 65.53 0.22 9875.00 37.95 38.05 -0.10 65.54 65.56 -0.02 9900.00 38.14 38.26 -0.12 65.36 65.01 0.35 9925.00 38.56 38.48 0.08 64.95 64.47 0.48 9950.00 38.90 38.63 0.27 64.82 64.61 0.20 9975.00 39.17 39.05 0.12 64.30 64.44 -0.14 10000.00 39.62 39.68 -0.06 64.38 64.45 -0.07 10025.00 39.56 39.60 -0.04 63.82 63.84 -0.02 10050.00 39.43 39.51 -0.08 62.99 63.00 -0.01 10075.00 39.29 39.36 -0.07 63.78 63.60 0.17 10100.00 39.69 39.67 0.02 63.10 63.07 0.03 10125.00 39.79 39.90 -0.12 62.71 62.68 0.03 10150.00 39.99 40.11 -0.11 62.29 62.01 0.28 10175.00 40.13 40.06 0.07 62.58 62.24 0.34 10200.00 40.18 40.01 0.17 61.73 61.58 0.14 10225.00 40.15 40.02 0.13 62.26 62.31 -0.06 10250.00 39.89 39.88 0.00 61.29 61.37 -0.08 10275.00 40.09 40.10 -0.00 61.46 61.40 0.06 10300.00 40.26 40.19 0.06 61.99 62.01 -0.03 10325.00 40.40 40.45 -0.05 60.91 60.91 0.00 10350.00 40.66 40.68 -0.02 61.01 61.01 0.01 10375.00 40.71 40.81 -0.09 60.32 60.41 -0.09 SURV-Q367 (OPS SUR-MA-003) 19~" Nov 03 /Rev 35 Page S of 9 AK0208G 111 t Survey QC - RGS-CT ecification Sheet ~.® 10400.00 40.72 40.95 -0.23 60.23 60.10 0.13 10425.00 43.35 43.57 -0.22 61.11 60.75 0.36 10450.00 49.36 49.43 -0.07 63.49 63.15 0.34 10475.00 57.07 57.04 0.03 64.28 64.23 0.05 10500.00 64.49 64.49 0.01 68.91 68.89 0.02 10525.00 71.27 71.20 0.07 71.68 71.65 0.04 Average -0.0148 0.1827 Standard Deviation 0.1877 0.3344 Tolerance for both the Average and the Standard Deviation Casing 0.3~ Drill i e 0.3~ Casing 0.5° Drill i e 0.75 a..~i.i .a~~.v.~ u~iu n<~iiiulll II IICI FlVIOICU lV JdIIIC UCFJ I(I5 dS SflUWfl. SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 9 of 9 AK0208G_ili Survey QC - RGS-CT Acceptance Sheet FIELD AND SIIRVFV rwFnRn~errnni Operator gp Field /Platform Mast Truck Well Number F PAD F-27 Survey section From 3448.16 ft. to 10548.18 ft. Date 3/7/2008 Gyrodata Job No AK0208G_ili Gyrodata Surveyors Steve Thompson Job Objective High Accuracy Gyro Survey SURVEY PERFORMAN['F In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either Inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q166 (OPS SUR-MA-003) 13`" Nov 03 /Revision 12 Page 1 of 1 AK0208G 311 ~-- ~ ~~~ DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051240 Well Name/No. PRUDHOE BAY UNIT F-27A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21659-01-00 MD 12415 TVD 9034 Completion Date 9/2/2005 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes .r-' DATA INFORMATION Types Electric or Other Logs Run: MWD /EWR / SGRD / SGRC / SROP, MGR /CCL /CNL Well Log Informat ion: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No ~D D Asc Directional Survey ~D C Lis 13496' Neutron ~D D Lis 13441' Induction/Resistivity i Rpt .B"~ 13441 I ty Lh tv ~! ~~~ ° ~i ~itog ~ Neutron 2 Blu 1 'lE=D C Pdf 13890 Induction/Resistivity 1-2 ~D C Pdf 13890 Rate of Penetration 1-2 ED C Lis 13890 Induction/Resistivity Well Cores/Samples Information: (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments 10400 12415 Open 9/26/2005 i 9128 12291 Case Mem CNL plus Graphics 10202 12365 1/31/2006 GR/EWR4/ROP 10202 12365 1/31/2006 GR/EWR4/ROP 9126. 12289 Case MCNL Memory GR/CCL/CNL 01-Sept-2005'; 8926 8967 C ae 5/10/2006 NPG EWR 30-Aug-2005 ' 10436 12415 6/10/2006 ROP NGP EWR 30-Aug- 2005 10202 12378 Open 5/10/2006 GR, ROP, RPD Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? N Chips Received? •YJ..QI.- Formation Tops ~ N Analysis ~,Y~ Received? ~. Comments: DATA SUBMITTAL COMPLIANCE REPORT 10/29/2007 Permit to Drill 2051240 Well Name/No. PRUDHOE BAY UNIT F-27A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21659-01-00 MD 12415 TVD 9034 Compliance Reviewed By: _ __ Completion Date 9/2/2005 r Completion Status 1-OIL Current Status 1-OIL UIC N ---- --- --- -- --- Dat~~~o~ _~~r 7 U ~3~9a a~ -icy WELL LOG TRANSMITTAL To: State of Alaska Apri127, 2006 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7`~ Ave., Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs F-27A, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 F-27A: LAS Data & Digital Log Images: 50-029-21659-01 1 CD Rom eoS-ie~! 5(~5~0~ • • Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well _Inh it +•~ .. ~ n,. -..: 02/09/06 NO. 3677 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay 13-31A „~0$ - 'tpp 11162828 MEM JEWELRY & PRESSURE SURVEY 01/07/06 1~ vv DS 18-036 ~p~ -p ~ 11057071 SBHP SURVEY 12/02/05 1 NK-43 ~C / - C C j 10987562 SBHP W/SPINNER PASSES 01/07/06 1 B-13A /~r~ - ~5 11183463 LEAK DETECTION LOG 01/28/06 1 DS 06-22A JG/_ -C5 j N/A SENSAlMEM LDL 01/28/06 1 DS 11-26 J ;(p •- 134- 11183462 INJECTION PROFILE 01/28/06 1 P1-09 / g(t •• j~ 11098756 PROD PROFILE W/DEFT 8~ GHOST 01/30/06 1 L5-05 / -- C'(~ry 11058541 RST 11/11/05 1 1 Z-29 ~ ~C~ S" 11051081 RST 08/10/05 1 1 L5-09 j ~iC - / 11090725 RST 11/11/05 1 1 15-44 )ca(i. - / 10 11194155 RST 01/15/06 1 1 C-206 ~O/- J J4 11075913 MCNL 08/29/05 1 1 02-14A ~~~- - J 11075901 MCNL 07/29105 1 1 Z-21 A ~+/ C - %O ( 11076449 RST 06/30/05 1 1 F-27A a~O - %q7q--- 10928641 MCNL 09/01/05 1 1 MPH-15 C ~ -• ~~y 11076486 USIT 12/15/05 1 13-31A cg - j to C 11133211 SCMT 12/23/05 1 WGI-04 / • - ~ 11183461 USIT 01/26/06 1 WGI-04 /•)9-O~ 11211566 USIT 02/03/06 1 WGI-08 9 ~- O 10987559 USIT 01/02/06 1 WGI-08 ~+o -- cs~y 11058259 USIT 01/12/06 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: '~~) , % G` I G %a Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: / \'~~.._-i\/ ~i' F ;\ ~--' ~ • ~ WELL LOG TRANSMITTAL To: State of Alaska January 30, 2006 Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7`~' Avenue, Suite 100 Anchorage, Alaska 99501 ~ ~ ¢ ~ i RE: MWD Formation Evaluation Logs: F-27A,~(~J-' ~O~¢AK-MW-3907939 1 LDWG formatted Disc with verification listing. API#: 50-029-21659-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 Date:~0~_ Signed: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM13510N WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~ ..~. ~~D ~I~.r L ~ c~Q5 Ala:k~. ,~,~ ;x u~~ I~ 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 20AAC 25.105 20AAC 25.110 ^ G1NJ ^ WINJ ^ WDSPL No. of Com letions One p Other 1b. Well Class~b~~~8~~ ®Development xploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) fnc. 5. Date Comp., Susp., or Aband. 9/2!2005 12. Permit to Drill Number 205-124 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 8/27/2005 13. API Number 50-029-21659-01-00 4a. Location of Well (Governmental Section): Surface: 2249' FSL 2195' FEL SEC T1 02 R 7. Date T.D. Reached 8/30/2005 14. Well Name and Number: PBU F-27A , , . , 1 N, 13E, UM Top of Productive Horizon: 4420' FSL, 1546' FWL, SEC. 01, T11N, R13E, UM g, KB Elevation (ft): 67.9' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 31$9' FSL, 2177' FWL, SEC. 01, T11N, R13E, UM 9. Plug Back Depth (MD+TVD) 12379 + 9035 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 652650 y- 5973783 Zone- ASP4 10. Total Depth (MD+TVD) 12415 + 9034 Ft 16. Property Designation: ADL 028280 TPI: x- 656344 y- 5976030 Zone- ASP4 Total Depth: x- 657001 Y- 5974813 Zone- ASP4 11. Depth where SSSV set (Nipple) 2087' MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / EWR / SGRD / SGRC / SROP, MGR ! CCL / CNL 2. CASING, LINER AND CEMENTING RECORD CASING ETTING EPTH MO' ETTING PTH TVD HALE /pJ ~ UNT $iZE WT. PER FT. GRADE OP OTTOM OP OTTOM SIZE C ELATING RI 6Rt~' LLED 20" Conductor Surface 110' Surface 110' 8 cu ds Co ~ 13-3/8" 72# L-80 Surface 2696' Surface 2696' 17-1/2" 3351 cu ft Arcticset ft AS II 9-5/8" 47# L-80 Surface 9736' Surface 8453' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 9491' 10419' 8255' 8982' 8-1/2" 327 cu ft Class 'G' @ ~0 s-, /2" x 33/1 a" x 2-~/a" 8.81# / 6.2# / 6.16# L-80 9491' 12415' 8255' 9034' 4-1 /8" 185 cu ft Class 'G' 23. Perforations open to Produc B tion (MD + TV D of Top and ' " 24. TUBING RECORD ottom Interval, Size and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 6 spf 4-1/2', 12.6#, L-$0 9539' 9434' MD TVD MD TVD 10720' -10990' 9048' - 9045' 11060' - 11190' 9044' - 9045' 25. ACID, FRACTURE, CEPAENT SQUEEZE, ETC. 11290' - 11370' 9041' - 9039' 11480' -11720' 9038' - 9038' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 11890' - 12180' 9040' - 9035' 2500' Freeze Protect w/ McOH 12270' - 12365' 9034' - 9035' 26. PRODUCTION TEST Date First Production: September 26, 2005 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date of Test 9/27/2005 Hours Tested 4 PRODUCTION FOR TEST PERIOD • OIL-BBL 555 GAS-MCF 363 WATER-BBL 23 CHOKE SIZE 176 GAS-OIL RATIO 655 Flow Tubing Press. 20 Casing Pressure 1,150 CALCULATED 24-HOUR RATE OIL-BBL 3,327 GAS-MCF 2,179 WATER-BBL 71 OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". Tom, ~ .7" svs%~xJo~-J /G ylS ,.~~Q' /~ 79 ~ Y~,p None ~ - .. '~.,5 ~+~ ~~, Q ~~ ~ ZQQS t F I... i Form 10-407 Revised 1~/~003 CONTINUED ON REVERSE $IDE l 28. GEOLOGIC MARKERS 29' FORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 1 B 10457' 9008' None TDF /Zone 1A 10517' 9038' TDF /Zone 1A 11896' 9040' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date l~ PBU F-27A 205-124 Prepared ey Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Ted Stagg, 564-4694 INSTRUCTIONS GeNew-L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only • • BP EXPLORATION Operations Summary Report Page 1 of 8 ~ Legal Well Name: F-27 Common W ell Name: F-27 Spud Date: 10/13/1986 Event Nam e: REENTE R+COM PLET E Start : 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALIST A Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task ' Code NPT ' Phase Description of Operations 8/25/2005 16:00 - 18:00 2.00 MOB P PRE Rig released from E-33A C«~ 16:OOHrs on 8!25!2005. Prep to move rig off well. 18:00 - 19:00 1.00 MOB P PRE PJSM. Jack-up rig & pull rig off well. Conduct post-operations pad inspection. Scope down derrick. Move rig to pad entrance. 19:00 - 19:30 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 19:30 - 00:00 4.50 MOB P PRE Move rig from E-pad to F-pad. Had to wait on Tool Services to reposition mat boards at several places. 8/26/2005 00:00 - 01:30 1.50 MOB P PRE Move rig from E-pad to F-pad. Arrive @ F-pad & position rig in front of F-27. Install dikes around tree. 01:30 - 01:45 0.25 RIGU P PRE PJSM. Review procedure, hazards & mitigation for raising derrick. 01:45 - 02:30 0.75 RIGU P PRE Scope up derrick & raise BOP stack. 02:30 - 02:45 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig over well. 02:45 - 03:00 0.25 MOB P PRE Back rig over well & set down. Accept rig C~3 03:OOHrs on 8/26/2005. 03:00 - 05:00 2.00 RIGU P PRE N/U BOPE & grease tree valves. 05:00 - 10:30 5.50 BOPSU P PRE Perform initial BOPE function/pressure test as per well plan. 250 psi/3500 psi for Combis, VBR, blind/shear, packoff. 250 psi/2500 psi for Hydril. All tests good. AOGCC test witness waived by Jeff Jones. 10:30 - 12:00 1.50 RIGU P PRE Continue RU. Spot outside trailers & tanks. R/U hardline to tiger tank & P/test to 4000psi. 12:00 - 14:00 2.00 RIGU N WAIT PRE Hot water plant down. Wait on KCI from MI for milling. 14:00 - 14:45 0.75 RIGU P ' PRE Pump dart: coil volume 52.6 bbl. PT inner reel valve. 14:45 - 16:30 1.75 STWHIP P WEXIT Check tree, valves and BOPE to make sure ready to go. PU Milling BHA #1 Stab injector on well. 16:30 - 18:30 2.00 STWHIP P WEXIT RIH with milling BHA #1. Kick while Trip drill @ 16:45. 18:30 - 19:00 0.50 STWHIP P WEXIT Continue RIH with BHA #1. Wt check @ 10400': Up = 46k, down = 25k. Tag WS/Lnr pinch pt dry @ 10416.9' & with pumps @ 10415.2'. Stall 2x. Establish freespin 2.5bpm/1600psi. Ease into milling from 10413' & tag pinch ~ 10415'. Flag pipe & correct depth to 10417.6' (pinch pt ELMD). 19:00 - 21:30 2.50 STWHIP P WEXIT Start milling window with 2.5/1600psi. Motor stalling repeatedly 10417.9'. Ease-in several times but motor kept stalling. 21:30 - 22:00 0.50 STWHIP P WEXIT P/U & park mill C~? 10415'. Circ C~ 2.8bpm/1800psi for 30mins to flush pinch pt of any debris. 22:00 - 22:50 0.83 STWHIP P WEXIT Ease back-in several times & motor still stalling. Finally grind past restriction & mill to 10418.2'. Lose pump#1. P/U & switch to pump #2. 22:50 - 00:00 1.17 STWHIP P WEXIT Continue milling window to 10419' with 2.65/2.65bpm, 1600psi/1750psi & 1-3k WOB. $/27/2005 00:00 - 02:15 2.25 STWHIP P WEXIT Mill window to 10422' with 2.65/2.65bpm, 1600psi/1750psi & 1-3k WOB. 02:15 - 04:00 1.75 STWHIP P WEXIT Control mill window to 10425' with 2.65/2.65bpm, 1600psi/1750psi & 4k WOB. Exit Inr into formation. 04:00 - 05:50 1.83 STWHIP P WEXIT Mill formation to 10435' with 2.65/2.65bpm 1600/1950psi, 4k Printed: 9/12/2005 10:05:51 AM • . BP EXPLORATION Page 2 of 8 Operations Summary Report Legal Well Name: F-27 Common Well Name: F-27 Spud Date: 10/13/1986 Event Name: REENTER+COMPLETE Start: 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALISTA Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 Date From - To 'Hours Task IE Code I',~ NPT Phase I Description of Operations 8/27/2005 04:00 - 05:50 1.83 STWHIP P WEXIT WOB & 8fph ave ROP. Geo seeing formation in BU samples Tentative window depths are: TOWS = 10413', TOW = 10417.6', BOW = 10425', RA PIP Tag = 10423'. 05:50 - 07:30 1.67 STWHIP P WEXIT Swap wellbore to reconditioned flopro mud. Meanwhile backream & dress window/rat hole. 07:30 - 10:00 2.50 STWHIP P WEXIT POOH for BHA change. 10:00 - 11:00 1.00 STWHIP P WEXIT LD Milling BHA #1. 11:00 - 12:45 1.75 STWHIP P WEXIT Jet stack to clear shavings. Work on SLB computer system. 12:45 - 13:15 0.50 DRILL P PROD1 Pre-spud meeting. 13:15 - 14:20 1.08 DRILL P PROD1 PU build BHA #1 SHT orienter. 14:20 - 17:15 2.92 DRILL P PROD1 RIH to 10435'. Tie-in going down to shale marker @ 10230'. Correction: Continue RIH to TD (pumps off going through window). 17:15 - 17:45 0.50 DRILL P PROD1 Orient TF to 10R. 17:45 - 18:45 1.00 DRILL P PROD1 Drill build section to 10460'. PU wt: 40K Ib, SO wt: 32K Ib. Pressure on/off btm: 3300 psi/3000 psi. O in/out: 2.4/2.4 bbl/min Saw RA PIP tag @ 10424'. Confirmed window depths are: TOWS = 10414', TOW = 10418.6', BOW = 10426'. 18:45 - 19:30 0.75 DRILL P PROD1 Drill to 10477' with 10-30R TF, 2.6/2.6bpm, 3200/3400psi, 1 k WOB & 25fph ave ROP. 19:30 - 20:45 1.25 DRILL P PROD1 Drill to 10504' with 25-45R TF, 2.6/2.6bpm, 3050/3150psi, 1 k WOB & 25fph ave ROP. 20:45 - 21:45 1.00 DRILL P PROD1 Orient TF around to 20R. 21:45 - 23:15 1.50 DRILL P PROD1 Drill to 10585' with 30-40R TF, 2.5/2.5bpm, 3100/3300psi, ik WOB & 60fph ave ROP. Estimate 86degs at the bit. Geo seeing some tar in BU samples. Decide to POOH for lateral BHA. 23:15 - 00:00 0.75 DRILL P PROD1 POOH drilling BHA#2. 8/28/2005 00:00 - 01:15 1.25 DRILL P PROD1 Continue POOH drilling BHA#2. 01:15 - 02:00 0.75 DRILL P PROD1 OOH. PJSM. S/B injector. Inspect orienter& motor - OK. Check bit -grade 3/2/I with 1 plugged jets & slight ring on the pilot. L/O bit. Reset motor bend to 1.2degs & P/U resistivity tool. 02:00 - 03:20 1.33 DRILL P PROD1 M/U drilling BHA #3 with 1.2deg X-treme motor, MWD/GR-RES, orienter & new Bit #3 [HYC DSX304 3-3/4" x 4-1/4" bicenter]. Scribe tools & initialize resistivity tool. M/U injector. 03:20 - 05:45 2.42 DRILL P PROD1 RIH drilling BHA #3. SHT - OK. Continue RIH to btm. 05:45 - 07:45 2.00 DRILL P PROD1 Log up & MAD-pass resistivity data C~3 70fph. Tie-in w/ GR: -3' correction. RIH, orienting to btm. 07:45 - 10:15 2.50 DRILL P PROD1 Drill lateral TF: 0-90R. PU wt: 40K Ib, SO wt: 21 K Ib. Pressure on/off btm: 3150-3550 psi/2950 psi O: 2.6/2.6 bbl/min ROP: 56 fUhr I Drill orient time: 60%/40%. Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Page 3 of 8 ~ Legal Well Name: F-27 Common Well Name: F-27 Spud Date: 10/13/1986 Event Name: REENTER+COMPLETE Start: 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALISTA Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task `Code) NPT ' Phase Description of Operations ~ - - -- __ 8!28/2005 10:15 - 11:00 0.75 DRILL P PROD1 Wiper trip to window. Orient on way back down. 11:00 - 11:30 0.50 DRILL P '! PRODi Drill lateral 11:30 - 12:00 0.50 DRILL P 12:00 - 14:30 ~ 2.50 DRILL P 8/29/2005 14:30 - 14:55 14:55 - 15:05 15:05 - 18:30 18:30 - 19:30 19:30 - 19:45 19:45 - 20:00 20:00 - 20:45 20:45 - 21:10 21:10 - 21:20 21:20 - 21:35 21:35 - 22:00 22:00 - 22:35 22:35 - 22:40 22:40 - 23:00 23:00 - 00:00 00:00 - 00:45 00:45 - 01:45 01:45 - 02:00 0.42 DRILL P 0.17 DRILL P 3.42 DRILL i P 1.00 DRILL P 0.25 DRILL P 0.25 DRILL P 0.75 DRILL P 0.42 DRILL P 0.17 DRILL P 0.25 DRILL P 0.42 DRILL P 0.58 DRILL P 0.08 DRILL P 0.33 DRILL P 1.00 DRILL P 0.75 DRILL P 1.00 DRILL P 0.251 DRILL I P TF: 75-90L. PU wt: 40K Ib, SO wt: 21 K. Pressure on/off btm: 3500-3900 psi/3050 psi. O: 2.6/2.6 bpm ROP: 114 fUhr. Drill orient time: 60%/40%. PRODi Orient around to 180. PROD1 Drill lateral TF: 90R PU wt: 42K Ib., SO wt: 21 K Ib. Pressure on/off btm: 3150-3500 psi/3100 psi O: 2.6/2.6 bpm. ROP: 44 fUhr. Drill/orient time: 75%/25% PROD1 Wiper trip to window. PROD1 Orient TF to 75R. PRODi Drill lateral. TF: 80 R PU wt: 43K Ib., SO wt: 23K Ib. Pressure on/off btm: 3350-3600 psi/3200 psi O: 2.6/2.6 bpm. ROP: 60 ft/hr. Drill orient time: 80%/20%. PROD1 Wiper trip clean to 9400' (into tbg tail). RBIH to below the window. PROD1 Log up GR & tie-into RA PIP tag - 0' correction. PROD1 RBIH to btm. Meawhile swap well to fresh 8.6ppg flopro mud with 3% L-T & 14ppb K-G. PROD1 Drill to 11113' with 90-115R TF, 2.6/2.6bpm, 3400/3700psi, 5k WOB & 80fph ave ROP. PROD1 Short wiper & orient TF around to 60R. P/U wt = 41 k, S/O wt = 21 k. PVT = 297bb1s. PROD1 Drill to 11133' with 40-45R TF, 2.6/2.6bpm, 3150/3350psi, 4k WOB & 95fph ave ROP. PROD1 Orient 1 click & drill to 11153' with 60-65R TF, 2.6/2.6bpm, 3150/3350psi, 4k WOB & 100fph ave ROP. PROD1 Orient 1 click & drill to 11200' with 85-95R TF, 2.6/2.6bpm, 3150/3350psi, 4k WOB & 110fph ave ROP. PROD1 Wiper trip clean to window. RBIH to btm. PROD1 Drill to 11203' with 90R TF, 2.6/2.6bpm, 3050/3350psi, 4k WOB & 35fph ave ROP. Geo wants to drill up to 8972'ssvd. PROD1 Orient TF around to 60R. PROD1 Drill to 11245' with 55-65R TF, 2.6/2.6bpm, 3100/3600psi, 5k WOB & 45fph ave ROP. PROD1 Orient 2 clicks & drill to 11260' with 90-95R TF, 2.7/2.7bpm, 3200/3600psi, 5k WOB & 20fph ave ROP. PROD1 Orient 1 click & drill to 11328' with 105R TF, 2.6/2.6bpm, 3000/3300psi, 2k WOB & 70fph ave ROP. Geo wants to drill up to 8970'ssvd. PROD1 Drill to 11350' with 85-95R TF, 2.6/2.6bpm, 3000/3300psi, 2k Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Page 4 of 8 ~ Legal Well Name: F-27 Common Well Name: F-27 Spud Date: 10/13/1986 Event Name: REENTER+COMPLETE Start: 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALISTA Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 , Date From - To Hours Task Code ! NPT Phase Description of Operations 8/29/2005 01:45 - 02:00 0.25 DRILL P PROD1 WOB & 120fph ave ROP. 02:00 - 02:40 0.67 DRILL P PROD1 Wiper trip clean to window. RBIH to btm. 02:40 -04:40 2.00 DRILL P PROD1 Drill to 11500' with 85-100R TF, 2.6/2.6bpm, 3000/3300psi, 2k WOB & 80fph ave ROP. 04:40 - 05:50 1.17 DRILL P PROD1 Wiper trip clean to 9400' (into tbg tail). RBIH to below the window. 05:50 - 06:10 0.33 DRILL P PROD1 Log up GR & tie-into RA PIP tag +1' correction. 06:10 - 06:45 0.58 DRILL P PROD1 RBIH to btm. 06:45 - 09:00 2.25 DRILL P PROD1 Drill lateral f/ 11500' to 11650'. 09:00 - 10:15 1.25 DRILL P PROD1 10:15 - 10:45 0.50 DRILL N RREP PROD1 10:45 - 12:00 1.25 DRILL P PROD1 12:00 - 14:15 2.25 DRILL P PROD1 14:15 - 15:30 1.25 DRILL P PROD1 15:30 - 15:45 0.25 DRILL P PROD1 15:45 - 18:25 2.67 DRILL P PROD1 18:25 - 18:40 I 0.251 DRILL I P I I PROD1 18:40 - 18:50 0.17 DRILL P PROD1 18:50 - 20:20 1.50 DRILL P PROD1 20:20 - 20:25 0.08 DRILL P PRODi 20:25 - 20:45 0.33 DRILL P PROD1 20:45 - 20:55 0.17 DRILL P PROD1 20:55 - 21:05 0.17 DRILL P PROD1 21:05 - 21:15 0.17 DRILL P PROD1 21:15 - 21:35 0.33 DRILL P PRODi 21:35 - 21:50 0.25 DRILL P PRODi PU wt: 45K Ib, SO wt: 24K Ib. Pressure off/on btm: 2900 psi/ 3400-3700 psi. O: 2.75/2.75 bpm. ROP: 67 ft/hr. Wiper trip to window. SLB replacing card in control system. Pressure trips not working for pumps. Wiper trip to tubing tail: 9500' RIH to TD. Drill lateral f/ 11650' to 11800'. PU wt: 44K, SO wt: 22K Ib. Pressure off/on btm: 3000 psi/ 3500-3600 psi. O: 2.7/2.7 bpm. ROP: 67 ft/hr Drill/orient time: 40%/60%. Wiper trip. Orient. Drill lateral f/ 11800' to 11928' PU wt: 44K Ib., SO wt: 22K Ib. Pressure off/on btm: 3050 psi/3500-3600 psi. O: 2.6/2.6 bpm ROP: Drill/Orient time: 40%/60%. Orient 1 click & drill to 11936' with 60-75L TF, 2.7/2.7bpm, 3000/3400psi, 3k WOB & 45fph ave ROP. Geo wants to drill up to 8968'sstvd. Orient 1 click & drill to 11950' with 50-80L TF, 2.5/2.5bpm, 3000/3250psi, 4k WOB & 75fph ave ROP. Wiper trip to the window with slight wt bobbles across shale areas. RBIH to btm. Meawhile swap well to fresh 8.6ppg flopro mud with 3% L-T & 14ppb K-G. Drill to 11960' with 90-105L TF, 2.65/2.65bpm, 3100/3350psi, 2k WOB & 150fph ave ROP. Holding 9ldegs incl. Orient 1 click & drill to 11986' with 65-105L TF, 2.6/2.6bpm, 3100/3350psi, 2k WOB & 85fph ave ROP. Orient 1 click & drill to 11992' with 85-95L TF, 2.65/2.65bpm, 3100/3350psi, 2k WOB & 35fph ave ROP. Orient 1 click & drill to 12000' with 75-85L TF, 2.65/2.65bpm, 3100/3350psi, 2k WOB & 55fph ave ROP. Orient 1 click & drill to 12009' with 60-70L TF, 2.65/2.65bpm, 3100/3350psi, 2k WOB & 55fph ave ROP. Orient 1 click & drill to 12032' with 55-65L TF, 2.6/2.6bpm, 2900/3100psi, 2k WOB & 65fph ave ROP. Orient 1 click & drill to 12050' with 45-55L TF, 2.6/2.6bpm, Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Page 5 of 8 ~ Legal Well Name: F-27 Common Well Name: F-27 Spud Date: 10/13/1986 Event Name: REENTER+COMPLETE Start: 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALISTA Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations - - 8/29/2005 21:35 - 21:50 0.25 DRILL P PROD1 2900/3100psi, 2k WOB & 75fph ave ROP. 21:50 - 22:00 0.17 DRILL P PROD1 Orient 1 click & drill to 12059' with 45-50L TF 2.6/2.6bpm 2900/3100psi, 2k WOB & 55fph ave ROP. 22:00 - 22:10 0.17 DRILL P PROD1 Orient 1 click & drill to 12071' with 40-50L TF, 2.6/2.6bpm, 2900/3100psi, 2k WOB & 55fph ave ROP. 22:10 - 22:35 0.42 DRILL P PROD1 Orient 1 click & drill to 12100' with 30-35L TF, 2.6/2.6bpm, 2900/3100psi, 2k WOB & 75fph ave ROP. 22:35 - 00:00 1.42 DRILL P PROD1 Wiper trip clean to 9400' (into tbg tail). 8/30/2005 00:00 - 00:25 0.42 DRILL P PROD1 RBIH to below the window. 00:25 - 00:45 0.33 DRILL P PROD1 Log up GR & tie-into RA PIP tag - +6' correction. 00:45 - 01:30 0.75 DRILL P PROD1 RBIH to btm tagged @ 12106'. 01:30 - 01:35 0.08 DRILL P PROD1 Orient & drill to 12114' with 30L TF, 2.55/2.55bpm, 2850/3100psi, 2k WOB & 110fph ave ROP. 01:35 - 01:55 0.33 DRILL P PRODi Orient TF around to 90L. P/U wt = 41 k, S/O wt = 21 k. PVT = 270bb1s. 01:55 - 02:05 0.17 DRILL P PROD1 Drill to 12122' with 95-110L TF, 2.6/2.6bpm, 2950/3150psi, 2k WOB & 85fph ave ROP. 02:05 - 03:30 1.42 DRILL N SFAL PROD1 Wiper trip to 11450' while Sperry-sun fixes its crashed computers. 03:30 - 03:45 0.25 DRILL P PROD1 Drill to 12139' with 90-100L TF, 2.6/2.6bpm, 2950/3150psi, 2k WOB & 80fph ave ROP. 03:45 - 04:55 1.17 DRILL P PROD1 Orient & drill to 12224' with 60L TF, 2.55/2.55bpm, 2850/3100psi, 2k WOB & 110fph ave ROP. 04:55 - 05:15 0.33 DRILL P PRODi Orient TF to 90L. 05:15 - 06:05 0.83 DRILL P PROD1 Drill to 12275' with 80-120L TF, 2.7/2.7bpm, 3100/3550psi, 5k WOB & 95fph ave ROP. 06:05 - 08:00 1.92 DRILL P PROD1 Wiper trip to window. RIH. Encounter obstruction at 10500', pop through at 10600'. 08:00 - 10:10 2.17 DRILL P PROD1 Drill f/ 12,275' - 12,415'. TD called by town. ROP: 65 fUhr. 10:10 - 11:30 1.33 DRILL P PROD1 Wiper trip to window. 11:30 - 11:45 0.25 DRILL P PRODi Tie-in to RA tag. Correction +1 ft. 11:45 - 12:30 0.75 DRILL P PRODi RIH to TD tagged ~ 12415'. 12:30 - 16:00 3.50 DRILL P PRODi POOH lateral BHA laying-in fresh flopro mud in OH. Paint EOP flags C~? 9400' & 7400'. Chase solids to surface, jog back in hole @ 100fpm & chase back up to surface. 16:00 - 17:00 1.00 DRILL P PROD1 Download RES tool. L/O drilling BHA. Bit grades - 2/4/I with a slight ring on the pilot. 17:00 - 18:30 1.50 CASE P RUNPRD Install Baker CTC. Pull test to 35k & pressure test to 3500psi OK. 18:30 - 19:20 0.83 CASE P RUNPRD Pump coil tubing volume dart. Volume 52.4 bbls. RD dart catcher. - Bring Baker tools to rig floor for TAC tour. 19:20 - 19:40 0.33 CASE P RUNPRD PJSM for running liner. 19:40 - 00:00 4.33 CASE P RUNPRD RU tools for liner running. Run liner as per tally. - FE, 56 jts 2-7/8" STL - Pup, LSL - 35 jts 3-3/16" TCI I - 1 jt 3-1/2" STL, X nipple, Pups, Deployment sleeve. Stab injector. Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Page6of8~ Legal Well Name: F-27 Common Well Name: F-27 Spud Date: 10/13/1986 Event Name: REENTER+COMPLETE Start: 8/23/2005 End: 9/2/2005 Contractor Name: NORDIC CALISTA Rig Release: 9/2/2005 Rig Name: NORDIC 1 Rig Number: N1 Date I, From - To ~ Hours I Task. Code NPT ~ Phase ~',, Description of Operations -1-_ - _ - _ -- ~ _ - ___ -- 8/31/2005 00:00 - 01:45 1.75 CASE P RUNPRD RIH with liner. PU at widow, 45k. Run in OH with liner. Flags on depth. Run clean to bottom. Tag TD on depth at 12,415' MD. 01:45 - 03:00 1.25 CASE P RUNPRD Load and launch 5/8" steel ball. Circulate down at 2.3 bpm, 2300 psi. Release from liner. 03:00 - 05:00 2.00 CASE P RUNPRD Circulate well over to 2% KCI. 05:00 - 06:15 1.25 CASE P RUNPRD Continue to circulate well over to 2% KCI. - RU cementers. - Mix 2 ppb bio pill. 06:15 - 06:30 0.25 CEMT P RUNPRD PJSM with all personnel concerning cementing operations. Meanwhile continue circulating 2% KCI C~ 3.0/2.8bpm & 2000psi. 06:30 - 08:00 1.50 CEMT P RUNPRD Batch mix 33bbls 15.8ppg 'G' latex cmt with additives. Cmt to wt C~J 06:54hrs. Flush/PT lines to 4k. Pump 33bbls cmt slurry Q 2.32/2.26bpm & 1900psi. Close inner reel valve & clean lines. Load/launch CTWP with 500psi. Chase with 32bbls bio-KCL C~ 3.0/2.9bpm & 2130psi. CTW P engage LW P 52.6bbls away. Shear plug with 3200psi. Continue displacing LW P @ 2.812.7bpm, 2430psi & bump ~ 71 bbls away with 1000psi over. Bleed off & check floats -held. Pressure up to 500psi & sting out of liner. 31 bbls cmt pumped around shoe. CIP C~3 08:OOhrs. 08:00 - 09:45 1.75 CEMT P RUNPRD POOH ~ 100fpm pumping @ 0.55bpm to replace CT voidage only. 09:45 - 10:30 0.75 CEMT P RUNPRD OOH. PJSM. UD CTLRT. 10:30 - 10:45 0.25 BOPSU P RUNPRD Conduct weekly BOP function test. 10:45 - 11:00 0.25 CEMT P RUNPRD M/U swizzle nozzle. Stab on well & jet BOP stack. 11:00 - 14:30 3.50 CEMT P RUNPRD WOC. Meanwhile conduct rig tour for TAC team. 14:30 - 15:30 1.00 EVAL P LOWERI UO tools from pipe shed & R/U floor for running looging/cleanout BHA. 15:30 - 16:30 1.00 EVAL P LOWERI Initialize & test logging tools. P/U tools to rig floor. 16:30 - 16:45 0.25 EVAL P LOWERI PJSM on P/U &RIH MCNL tools & 1-1/4" CHS tbg. 16:45 - 19:15 2.50 EVAL P LOWERI P/U logging/cleanout BHA #5 with 2.30" D331 mill, 2-1/8" straight motor, XO, 2jts of 1-1/4" CSH tbg, MCNUCCUGR logging tool carrier, XO, lower MHA, 100jts of 1-1/4" CSH tbg, XO & upper MHA. M/U Injector. 19:15 - 20:30 1.25 EVAL P LOWERi RIH with logging assy to 9300' MD. 20:30 - 21:15 0.75 EVAL P LOWERI WOC to reach 500 psi compressive strength. 21:15 - 23:00 1.75 EVAL P LOWERi Log down from 9300' at 30 fpm. Pumping at 1.4 bpm, 1900 psi. - Tag PBTD at 12,371' MD. 23:00 - 00:00 1.00 EVAL P LOWERI PUH logging at 60 fpm, laying in 15 bbls pert pill. - Flag pipe EOP at 9,003' MD (10' off bottom with guns in hole). - Increase rate to 1.5 bpm once pert pill clears coil. - No cement returns at surface. 9/1/2005 00:00 - 01:15 1.25 EVAL P LOWERI POOH, 1.5 bpm. 01:15 - 03:00 1.75 EVAL P LOWERI Stand back 50 stands CSH. 03:00 - 03:30 0.50 EVAL P LOWERI PJSM. LD logging BHA, CSH, motor and mill. 03:30 - 06:30 3.00 CASE P RUNPRD WOC to reach 2000 psi compressive strength. - Check MCNUGR/CCL data quality. Good data. - Load pipe shed with guns. Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Page 7 of 8 Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From = To F-27 F-27 REENTE NORDIC NORDIC ', Hours R+COM CALIST 1 Task PLET A Code i E NPT Start Rig Rig Phase Spud Date: 10/13/1986 : 8/23/2005 End: 9/2/2005 Release: 9/2/2005 Number: N1 ~ Description of Operations 9/1/2005 03:30 - 06:30 3.00 CASE P RUNPRD -After discussion with SLB cement lab.. Discovered test conducted using wrong setting. Cement at 2500 psi UCA. From log data, PBTD = 12377.16' & TOL = 9489'. Fax CNL log to ANG Geo. ANC Geo OKs preliminary pert picks. 06:30 - 07:00 0.50 CASE P RUNPRD Line up & P/test wellbore for 30mins as follows: Time WHP CTP IAP OAP Onset 4 0 15 45 0 2000 0 15 45 10 1970 0 15 45 20 1960 0 15 45 30 1952 0 15 45 _> Passed: Leaked 2.4% of test pressure in 30 mins. Will not set LTP. 07:00 - 07:15 0.25 PERFO P LOW ER1 R/U safety jt & prep to M/U perf guns. 07:15 - 07:30 0.25 PERFO P LOWERi PJSM on perforation job. 07:30 - 10:30 3.00 PERFO P LOWERI M/U 78jts of 2" HSD 6spf 2006PJ guns & blanks with CBF ~ firing system. 10:30 - 11:30 1.00 PERFO P LOWERI M/U lower diconnect, 22 doubles of 1-1/4" CSH tbg & upper MHA. M/U injector. 11:30 - 14:00 2.50 PERFO P ~ LOWERI RIH with perforating BHA#6 circ perf pill @ min rate. Up wt check C 9400' = 39k. Run-in wt = 24k. Continue RIH & tag PBTD C~3 12373'. Pull to P/U wt & correct CTD to 12377.16' (PBTD as per MCNL). PUH to ball drop postion C~3 12356'. R/U sonogram detector to choke manifold for shot detection. 14:00 - 14:40 0.67 PERFO P ' , LOW ER1 Pump 5bbl perf pill ahead. Load 5/8" AL ball. Blow ball into CT with 5bbls perf pill behind. RBIH to 12365.7'. Chase ball 2.05bpm/1875psi. Slow to 0.80bpm/580psi @ 40bbls. Ball on seat after 47.2bbls away. S/D pumps & RBIH to 12370'. PUH very slowly & ramp up to 3100psi with btm shot Co3 12365'. Observe guns fire with good pressure drop indication & sonogram detection. Perforated interval = 10720' - 10990', 11060' - 11190', 11290' - 11370', 11480' - 11720', 11890' - 12180' & 12270' - 12365'. 14:40 - 15:40 1.00 PERFO P LOWERI POOH with perf gun BHA C~? 45fpm pumping down the CT ~ 1.5bpm/650psi. POOH to 9300'. Trip data indicate 5bbls loss while POOH to TOL. 15:40 - 15:55 0.25 PERFO P LOWERI S/D pump &flowcheck well for 15 mins -well stable. 15:55 - 17:30 1.58 PERFO P LOWERi POOH with perf gun BHA @ 85fpm pumping down the CT C~ 1.4bpm/600psi. Trip data indicate Obbls loss/gain while POOH from TOL to surface. 17:30 - 18:00 0.50 PERFO P LOWERI OOH. S/D pump &flowcheck well for 30 mins -well stable. 18:00 - 19:15 1.25 PERFO P LOWERI S/B injector. PJSM. L/D MHAs & R/B 22 stds of 1-1/4" CSH tbg. 19:15 - 19:30 0.25 PERFO P LOWERI PJSM for laying down perf guns. 19:30 - 00:00 4.50 PERFO P LOWERI Lay down 78 perf guns. 9/2/2005 00:00 - 00:30 0.50 PERFO P LOWERI Continue laying down perf guns. 00:30 - 02:15 1.75 WHSUR P POST MU nozzle. RIH, FP from 2500' with 60/40 MEOH. POOH. LD nozzle. - Close master. 02:15 - 03:00 0.75 W HSUR P POST PJSM. Cool down N2. Blow down reel. - Clean pits. 03:00 - 05:00 2.00 RIGD P POST Nipple down BOPE. NU, test tree cap. Printed: 9/12/2005 10:05:51 AM • • BP EXPLORATION Operations Summary Report Legal Well Name: F-27 Common Well Name: F-27 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To ~ Hours ~I Task ', Code' NPT 9/2/2005 ~ 03:00 - 05:00 2.00 RIGD P Start: 8/23/2005 Rig Release: 9/2/2005 Rig Number: N1 Page 8 of 8 Spud Date: 10/13/1986 End: 9/2/2005 Phase Description of Operations POST Rig released at: 05:00 hrs on 9/2/2005. 7 days & 2 Hrs on well. Printed: 9/12/2005 10:05:51 AM Halliburton Sperry-Sun North Slope Alaska BPXA F-27A Job No. AKMW3907939, Surveyed: 30 August 2005 Survey Report 14 September, 2005 Your Ref: API 500292165901 Surface Coordinates: 5973783.00 N, 652650.00E (70° 20' 07.2952" N, 148° 45' 41.4036" VV) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 67.90ft above Mean Sea Level sperr~y-5u1't • SE~v~c~s SurveyRef:sry4661 A H~lCiburton Company Halliburton Sperry-Sun Survey Report for F-27A Your Ref: API 500292165901 Job No. AKMW3907939, Surveyed: 30 August, 2005 North Slope Alaska BPXA Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) {ft) {ft) {ft) (ft) (ft) (°I100ft) 10400.00 40.820 60.890 8899.79 8967.69 2128.60 N 3658.50E 5975985.62 N 656264.41 E -1460.97 Tie On Point MWD Magnetic 10414.00 41.000 60.790 8910.37 8978.27 2133.07 N 3666.50E 5975990.25 N 656272.33E 1.368 -1463.98 Window Point 10445.94 47.810 61.900 8933.18 9001.08 2143.76 N 3686.11E 5976001.35 N 656291.71E 21.459 -1471.11 10475.73 57.040 62.900 8951.32 9019.22 2154.68 N 3707.01E 5976012.69 N 656312.39E 31.097 -1478.23 10508.14 66.780 64.010 8966.57 9034.47 2167.43 N 3732.57E 5976025.95 N 656337.68E 30.203 -1486.35 10541.10 75.320 71.370 8977.27 9045.17 2179.20 N 3761.38E 5976038.30 N 656366.24E 33.410 -1492.93 10571.00 83.080 73.070 8982.87 9050.77 2188.15 N 3789.32E 5976047.83 N 656394.00E 26.546 -1496.90 10602.48 89.070 74.480 8985.03 9052.93 2196.92 N 3819.46E 5976057.21 N 656423.96E 19.545 -1500.30 10632.88 92.950 76.600 8984.49 9052.39 2204.51 N 3848.89E 5976065.39 N 656453.22E 14.543 -1502.67 10669.98 93.040 80.300 8982.55 9050.45 2211.93 N 3885.18E 5976073.55 N 656489.36E 9.962 -1503.67 10699.34 93.390 86.110 8980.90 9048.80 2215.39 N 3914.28E 5976077.61 N 656518.37E 19.794 -1502.03 10730.74 93.920 88.230 8978.90 9046.80 2216.94 N 3945.57E 5976079.79 N 656549.63E 6.946 -1498.12 10759.61 93.390 86.110 8977.06 9044.96 2218.36 N 3974.35E 5976081.80 N 656578.37E 7.555 -1494.52 10790.36 91.980 86.820 8975.62 9043.52 2220.26 N 4005.00E 5976084.32 N 656608.98E 5.133 -1491.07 10823.26 90.310 87.170 8974.96 9042.86 2221.98 N 4037.85E 5976086.71 N 656641.79E 5.186 -1487.06 10854.97 89.870 91.050 8974.91 9042.81 2222.47 N 4069.55E 5976087.85 N 656673.47E 12.314 -1482.04 10885.01 88.460 95.450 8975.35 9043.25 2220.77 N 4099.53E 5976086.75 N 656703.48E 15.379 -1475.16 10915.86 88.280 100.560 8976.23 9044.13 2216.48 N 4130.06E 5976083.08 N 656734.09E 16.568 -1465.63 10947.29 88.460 105.490 8977.12 9045.02 2209.40 N 4160.66E 5976076.63 N 656764.83E 15.690 -1453.34 10976.86 90.480 107.790 8977.40 9045.30 2200.93 N 4188.99E 5976068.74 N 656793.32E 10.352 -1440.09 11012.01 90.480 112.720 8977.10 9045.00 2188.77 N 4221.95E 5976057.25 N 656826.53E 14.025 -1422.38 11042.25 91.720 117.480 8976.52 9044.42 2175.95 N 4249.32E 5976044.99 N 656854.15E 16.263 -1405.00 11087.93 88.990 123.640 8976.24 9044.14 2152.74 N 4288.63E 5976022.58 N 656893.93E 14.749 -1375.32 11119.79 88.110 129.110 8977.04 9044.94 2133.85 N 4314.27E 5976004.23 N 656919.94E 17.384 -1352.27 11149.14 90.040 134.390 8977.52 9045.42 2114.32 N 4336.15E 5975985.14 N 656942.22E 19.151 -1329.24 11192.74 89.780 138.980 8977.59 9045.49 2082.61 N 4366.05E 5975954.04 N 656972.76E 10.544 -1292.81 11222.50 92.420 147.260 8977.02 9044.92 2058.83 N 4383.89E 5975930.63 N 656991.08E 29.195 -1266.30 11256.44 94.450 150.960 8974.98 9042.88 2029.76 N 4401.28E 5975901.93 N 657009.06E 12.417 -1234.65 11291.00 92.950 157.$30 8972.75 9040.65 1998.68 N 4416.18E 5975871.15 N 657024.58E 20.306 -1201.46 11323.90 91.450 162.060 8971.48 9039.38 1967.81 N 4427.45E 5975840.52 N 657036.48E 13.632 -1169.09 11364.51 90.660 166.820 8970.74 9038.64 1928.70 N 4438.34E 5975801.64 N 657048.16E 11.880 -1128.69 11395.94 90.750 170.870 8970.35 9038.25 1897.88 N 4444.42E 5975770.94 N 657054.87E 12.888 -1097.28 11428.95 90.930 173.860 8969.87 9037.77 1865.17 N 4448.80E 5975738.33 N 657059.91E 9.073 -1064.30 11460.21 89.690 177.570 8969.70 9037.60 1834.00 N 4451.14E 5975707.22 N 657062.88E 12.513 -1033.21 11491.89 90.220 181.440 8969.72 9037.62 1802.33 N 4451.41E 5975675.56 N 657063.80E 12.330 -1001.97 • 14 September, 2005 - 14:07 Page 2 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for F-27A Your Ref: AP1500292165901 Job No. AKMW3907939, Surveyed: 30 August 2005 North Slope Alaska Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 11531.28 89.520 189.550 8969.81 9037.71 1763.15 N 4447.64E 5975636.31 N 657060.83E 20.665 -964.04 11571.19 90.310 191.660 8969.87 9037.77 1723.93 N 4440.30E 5975596.95 N 657054.29E 5.645 -926.69 11603.08 90.400 194.480 8969.67 9037.57 1692.87 N 4433.09E 5975565.75 N 657047.71E 8.847 -897.35 11640.43 89.520 199.420 8969.70 9037.60 1657.15 N 4422.20E 5975529.82 N 657037.55E 13.434 -864,07 11676.07 89.430 202.590 8970.03 9037.93 1623.88 N 4409.43E 5975496.30 N 657025.46E 8.898 -833.52 11719.08 90.840 208.050 8969.92 9037.82 1585.02 N 4391.04E 5975457.07 N 657007.87E 13.111 -798.44 11755.83 91.540 213.340 8969.16 9037.06 1553.44 N 4372.29E 5975425.11 N 656989.77E 14.517 -770.60 11780.06 90.480 216.510 8968.73 9036.63 1533.58 N 4358.42E 5975404.97 N 656976.31E 13.793 -753.45 11811.48 85.900 210.870 8969.73 9037.63 1507.47 N 4341.01E 5975378.51 N 656959.43E 23.113 -730.75 11848.08 88.190 206.460 8971.61 9039.51 1475.40 N 4323.49E 5975346.10 N 656942.56E 13.562 -702.22 11881.15 90.570 204.170 8971.97 9039.87 1445.52 N 4309.35E 5975315.93 N 656929.03E 9.987 -675.24 11910.70 89.870 201.710 8971.86 9039.76 1418.30 N 4297.83E 5975288.49 N 656918.07E 8.655 -650.45 11942.94 90.750 195.190 8971.68 9039.58 1387.74 N 4287.64E 5975257.72 N 656908.50E 20.406 -622.12 11977.17 89.970 189.370 8971.47 9039.37 1354.31 N 4280.36E 5975224.15 N 656901.91E 17.154 -590.46 12010.59 89.600 187.790 8971.59 9039.49 1321.26 N 4275.37E 5975191.01 N 656897.59E 4.856 -558.78 12041.61 90.130 185.490 8971.67 9039.57 1290.45 N 4271.79E 5975160.13 N 656894.64E 7.609 -529.06 12078.79 91.450 180.910 8971.15 9039.05 1253.35 N 4269.71E 5975122.99 N 656893.32E 12.818 -492.88 12111.30 93.920 180.380 8969.63 9037.53 1220.88 N 4269.35E 5975090.52 N 656893.61E 7.770 -460.96 12145.58 91.450 174.040 8968.02 9035.92 1186.69 N 4271.01E 5975056.38 N 656895.97E 19.828 -427.01 12175.86 91.630 170.690 8967.21 9035.11 1156.70 N 4275.03E 5975026.47 N 656900.61E 11.075 -396.77 12207.92 91.720 165.410 8966.27 9034.17 1125.36 N 4281.67E 5974995.27 N 656907.87E 16.464 -364.76 12240.59 89.780 160.830 8965.84 9033.74 1094.11 N 4291.15E 5974964.22 N 656917.99E 15.223 -332.33 12270.14 89.690 158.010 8965.98 9033.88 1066.45 N 4301.54E 5974936.78 N 656928.94E 9.548 -303.29 12300.61 88.630 157.650 8966.43 9034.33 1038.23 N 4313.03E 5974908.81 N 656941.01E 3.674 -273.51 12336.06 89.160 150.600 8967.11 9035.01 1006.36 N 4328.49E 5974877.26 N 656957.11E 19.940 -239.44 12368.77 90.040 147.790 8967.34 9035.24 978.27 N 4345.24E 5974849.51 N 656974.43 E 12394.41 91.280 143.730 8967.04 9034.94 957.08 N 4359.66E 5974828.62 N 656989.28 E 12415.00 91.280 143.730 8966.58 9034.48 940.48 N 4371.84E 5974812.28 N 657001.79 E Ali data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference . Northings and Eastings are relative to Well Reference . Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well Reference and calculated along an Azimuth of 170.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12415.OOft., The Bottom Hole Displacement is 4471.86ft., in the Direction of 77.859° (True). 9.002 -208.87 16.555 -185.49 0.000 -167.03 Projected Survey BPXA • • 14 September, 2005 - 14:07 Page 3 of 4 DrillQuest 3.03.06.008 Halliburton Sperry-Sun Survey Report for F-27A Your Ref.• AP1500292165901 Job No. AKMW3907939, Surveyed: 30 August 2005 North Slope Alaska Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 10400.00 8967.69 2128.60 N 3658.50E Tie On Point 10414.00 8978.27 2133.07 N 3666.50E Window Point 12415.00 9034.48 940.48 N 4371.84E Projected Survey Survey tool program for F-27A From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 10400.00 8967.69 CB-GYRO-MS (F-27) 10400.00 8967.69 12415.00 9034.48 MWD Magnetic (F-27A) BPXA • 14 September, 2005 - 14:07 Page 4 of 4 DrillQuest 3.03.06.008 TREE=~ 6" McEVOY WELLHEAD= McEVOY ACTUATOR = OTIS KB. ELEV = 67.9' BF. ELEV = 38.41' KOP = 10414' Max Angle = 94.5° @ 11256' Datum MD = 10269' Datum TV = 8800' SS 13-3/8" CSG, 68#, L-80, ID = 12.415" I 2694' Minimum ID = 2.37" @ 10600' 2-7f8" STL LNR PERFORATION SUMMARY REF LOG: MCNL/CCL/GR OF 9/1 /2005 TIE-IN LOG: GEOLOGY PDC LOG ANGLE AT TOP PERF: 93.6° @ 10720' Note. Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10720' - 10990' Opn 09/01/05 2" 6 11060' - 11190' Opn 09/01/05 2" 6 11290' - 11370' Opn 09/01/05 2" 6 11480' - 11720' Opn 09/01/05 2" 6 11890' - 12180' Opn 09/01/05 2" 6 12270' - 12365' Opn 09/01/05 TOP OF 7" LNR ~~ 9490 TOP OF3-1/2" X 3-3116" X 2-7!8" LNR 9491' 3-1/2" X NIP, ID= 2.813" 9510' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958~ 9539' 9-5/8" CSG, 47#, L-80, ID = 8.681" ~ 9734' EST TOP OF LINER CEMENT 10300' CHANICAL WHIPSTOCK ~-~ 10414' WINDOW 10419' - 10426' RA PIP TAG 10424' PBTD ~ 10626, 7" LNR, 26#, L-80, U4S, .0383 bpf, ID = 6.276" 10670' F-27A S ~~ CTD Sidetrack • 20 87' --14-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH POF 7 2985 2984 6 OTIS DOME RA 16 6 5058 4793 39 OTIS SO RA 20 5 6575 5952 41 OTIS DMY RA 0 4 7511 6676 38 OTIS DMY RA 0 3 8094 7132 39 OTIS DMY RA 0 2 8714 7621 37 OTIS DMY RA 0 1 9215 8031 34 OTIS DMY RA 0 9361' H4-1/2" OTIS XA SLIDING SLEEVE 9419' TNV SBR TBG SEAL ASSY 9434' 9-5/8" X 4-1 /2" TMJ HBBP PKR ID = 4.75" 9475' H4-1/2" OTIS X N~, ID = 3.813" 9491' BOT DEPLOY SLEEVE, 6' LONG, 3" ID 9508' 1~4-1/2" OTIS XN NIP, MILLED OUT TO 3.80" ID 9539' 4-1/2" BAKER SOS TBG TAIL 9544' ELMD TT LOGGED 11 /06/86 9543' 3-1/2" X 3-3/16" X-OVER 101 MARKER JOINT x 2-7/8 X-OVER CNL: 12377' 3-3/16" X 2-7/8" CMTED & PERFED~~ 12415' DATE REV BY COMMENTS DATE REV BY COMMENTS 10/31/86 ORIGINAL COMPLETION 07/17/01 RN/TP CORRECTIONS 07/12/03 CMO/TLP KB ELEVATION CORRECTION 09/21/03 CMO/TLP PERF ANGLE CORRECTION 09,02x'05 JUE NORDIGI CTD SIDETRACK PRUDHOE BAY UNff WELL: F-27A PERMfr No: 205-124 API No: 50-029-21659-01 SEC 2, T11 N, R13E, 2249' FSL & 2195' FEL BP 6cploration (Alaska) • • 20-Sep-05 AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well F-27A Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 10,400.00' MD Window /Kickoff Survey: 10,414.00' MD (if applicable) Projected Survey: 12,415.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date ~f I Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) • ~~ ~ 7~ ~ ~ ~~ ~ ~ ~ fi 1 ~ j ~~g ~ ~ r ;~ ~~ ~ ~ jam, ,'. s ~ °`~~ ~ ~ ~ A ; +. ~ ~ ~ ` ''~ ~ ~ FRANK H. MURKOWSKI, GOVERNOR , ~., ;. ~{ ~7~ ~t ~ ~+ ~~ ~i`L ~ ~ ~~ 333 W. 7'" AVENUE SUITE 100 z1 1aT CO~SrjRQ~~01` C~~'IISSIO~ ~ , ANCHORAGE, ALASKA 99501-3539 ~~' PHONE (907) 279-1433 FAX (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519 Re: PBU F-27A BP Exploration (Alaska), Inc. Permit No: 205-124 Surface Location: 2249' FSL, 2195' FEL, Sec. 02, T11N, R13E, UM Bottomhole Location: 3200' FSL, 2204' FWL, Sec. O1, T11N, R13E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Ple ovide at least twenty-four (24) hours notice for a representative of the Commission t w' any required test. Contact the Commission's petroleum field inspector a 7) ~9- 0 (pa ). DATED this~day of August, 2005 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~rGh ~jio/~p~- j STATE OF ALASKA ALASKA AND GAS CONSERVATION COM aSION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ^ Drill ®Redrill 1 b. Current Well Class ^ Exploratory ®Development Oil ^ Multiple Zone ^ Re-Entry ^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone 2. Operator Name: 5. Bond: ®Blanket ^ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 2S100302630-277 PBU F-27A 3. Address: 6. Proposed Depth: 12. Field /Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 12475 TVD 8980ss Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): 7. Property Designation: Pool Surface: ADL 028280 2249' FSL, 2195' FEL, SEC. 02, T11 N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4233' FSL, 1183' FW L, SEC. 01, Ti 1 N, R13E, UM September 5, 2005 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3200' FSL, 2204' FWL, SEC. 01, T11N, R13E, UM 2560 8650' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool Surface: x- 652650 - 5973783 Zone- ASP4 (Height above GL): 67.9' feet 500' 16. Deviated Wells: Kickoff Depth: 10415 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 91 de rees Downhole: 3200 Surface: 2320 18. mg rogram: Setting Depth uantrty o merit Size Specifications To Bottom ca. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD 'n to a data 4-1/8" s-a~~s~X2ais' 6.2#/6.16# L-80 STL 2990' 9485' 8183' 12475' 8980' -. AI 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 10670 9167 None 10626 9135 None Casin Len !h Size Cement Volume MD TVD n uct r 110' 20" cu ds Concrete 110' 110' 2696' 13-3/8" 351 cu ft AS III, 465 Cu ft AS II 2696' 2696' 9736' 9-5/8" 75 cu ft Class 'G' 9736' 8453' Pro ion 1179' 7" 27 cu ft Class 'G' 9491' - 10670' 8255' - 9167' Perforation Depth MD (ft): 10443' - 10515' Perforation Depth TVD (ft): 9000' - 9054' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Ptot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ted Stagg, 564-4694 Printed Name Ted S ag Title CT Drilling Engineer __ _ Prepared By Name/Number. Si nature Phone 564-4694 Date ~ ,f ai Terrie Hubble, 564-4628 Commission Use Only Permit To Drill API Number: Permit Approv See cover letter for Number: ,ZG~"~ ~ 50- 029-21659-01-00 Date: ~ ~ ,~ other requirements Conditions of Approval: Sampl uired ^ Yes ~ No Mud Log Require ^ Yes ~No Hy n tfide Measures Yes i _l No Directional Survey Required ~'es ^ No Other: ~~~p.y ~ d {~ ~ ~ d © ~~5-~ ~~ APPROVED BY u // A ve THE COMMISSION Date (~ / Form 10- 1 evi 6/200 ub In Duplicate gp Prudhoe Bay F-27A CTD Sidetrack CTD Sidetrack Summary Rig Work: 1. MIRU Nordic 1 and test BOPE to 250 psi low and 3500 psi high. /~ 2. Mi113.8" window at 10,415' MD (8911ss)' and 10' of Zone 2. Swap the well to Flo-Pro. 3. Drill approx. 2,060 ft of 4.125" OH. / 4. Run 3 3/16" x 2 7/8" solid liner le TOL at 9485' MD (8183'ss). 5. Cement liner with a minimum o 8 bbl''s to place top of cement at 10,300' MD (8824'ss). 6. Cleanout liner and MCNL/GR/ %1"og 7. Test liner lap to 2000 psi. 8. Perforate liner per asset instructions (expect approx. 1000 ft of perfs) 9. Freeze protect well, RDMO Mud Program: • Well kill: 8.5 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Casing Program: • 3 3/16" x 2 7/8" fully cemented liner • A minimum of 28 bbls 15.8 ppg cement will be used for liner cementing. Casing/I,iner Information 13 3/8", N-80, 68#, Burst 4930 psi; collapse 2270 psi 9 5/8", L-80 47#, Burst 6870, collapse 4750 7", L-80, 26#, Burst 7240 ;collapse 5410 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 91 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 8650 ft. • Distance to nearest well within pool - 500 ft. Logging • MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole CNL/GR/CCL log will be run. Hazards • The maximum recorded H2S level on F pad is 100 ppm (F-24 and F-39). • Lost circulation risk is low. Reservoir Pressure j • Res. press. is estimated to be 3200 psi at 8800'ss (7.0 ppg EMW). Max. surface pressure with gas (0.10 psi/ft) to surface is 2320 psi. TREE= , 6" McEVOY WELLHEAD = McEVOY ACTUATOR = OTIS KB. ELEV = _--- 67.9' BF. ElEV = 38.41' KOP = 3200' Max Angle = 43 @ 10600' Datum MD = 10269' Datum TV = 8800' SS 13-3/8" CSG, 68#, L-80, ~ = 12.415" Minimum ID = 3.725" @ 9508' 4-1/2" OTIS XN '~IPP~I< 5T MD TV D DEV TYPE V LV LATCH PORT DATE 7 2985 2984 6 OTIS DOME RA 16 6 5058 4793 39 OTIS SO RA 20 5 6575 5952 41 OTIS DMY RA 0 4 7511 6676 38 OTIS DMY RA 0 3 8094 7132 39 OTIS DMY RA 0 2 8714 7621 37 OTIS DMY RA 0 1 9215 8031 34 OTIS DMY RA 0 I4-1/2" OTIS XA SLIDING SLEEVE TNV SBR TBG SEAL ASSY 9-5/8" X 4-1 /2" TM/ HBBP PKR, ID = 4.75" TOP OF 7" LNR 9490' ~ 9475' 1~4-1/2" OTIS X NIP, ID = 3.813" TOP OF 3-3/16" LN 9485' ~ 9508' 4-1/2" OTIS XN NIP, ID = 3.725" 3.5" X Nip 2.813" ID 9500' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 9539' 9539' 4-1/2" BAKER SOS TBG TAIL 9-5/8" CSG, 47#, L-80, ID = 8.681" 9734' 9544' ELMD TT LOGGED 11/06/86 10192' 1 iwaRKER JOINT I 10300' I PERFORATION SUMMARY REF LOG: GEARHEART BHCS ON 10/28/86 ANGLE AT TOP PERF: 41 @ 10433' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 10443 - 10451 isolated proposed 3-3/8" 6 10462 - 10492 isolated proposed 3-3/8" 4 10462 - 10515 isolated proposed PBTD -j 10626, 7" LNR, 26#, L-80, lJ4S, .0383 bpf, ID = 6.276" 10670' I 10600' I 13-3/16 x 2-7/8 X-over 10415' I-Mechanical 3-3/16" X 2-7/8" cmt'ed and perfedl-{ 12475' DATE REV BY COMMENTS DATE REV BY COMMENTS 10/31/86 ORIGINAL COMPLETION 07/17/01 RNITP CORRECTIONS 07/12/03 CMO/TLP KB ELEVATION CORRECTION 09/21/03 CMO/TLP PERF ANGLE CORRECTION PRUDHOE BAY UNIT WELL: F-27 PERMIT No: 1861690 API No: 50-029-21659-00 SEC 2, T11 N, R13E, 2249' FSL 8 2195' FEL BP Exploration (Alaska) F-27A [ Proposed CTD Sidetrack O 4-1/2" OTIS SSSV NIP, ID= 3.813" GAS LIFT MANDRELS Go~adxrere (NrEI Rerermw: centre r ~1. true rva,n °~'NSiaa ~~'°~„o~~a~; M.w..a ~ A ,e'e~ za z, ro„~r,~ ~ a~ 6, ~r~ uearoa M Y 9950 a m~ 0 n ~ 8950 ~ 9999 a Aso F 9,09 2500. __----_-__- ____-__~__,_ _. _. .. _. 2400.. -_ __-.__ ._-. _-.-~. _.'!-__- n - -_ ----=------ 2300 - - - zzo9 a~a, _---_- :--_ __ -- -- ~ ~, .~ -• ,.~„ rte. _ . _ . :7 .. ...., _..-- r ---_ - - - --- ~---- - --- -- - .---- - - _ - - - .. _ :_ ~. _ __ __ __ -1700-1650-1600-1550-1500-1450-1400-1350-1300-1250-1200-1150-1100-1050-7000 -950 -900 -950 -600 -750 -700 -650 -600 -550 -500 -450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 Vertical Section at 170.00' [SOWin] AM _ IEGENg T P1n: Plsi R (F-TiMr,2. F-21A, BP Amoco ~~^ _ F~FPI~ M Azimuthsm True NorM ZZII Megrrotlc North: 24.91 ° ae.rea 9r eM Mrfwmm Ow: ~rzreoos s - Fhrr nF a Ma9nMic Fbm by ~ Stre~pU 57600oT~ '-~~'"I~..~~,.,~.d1Xii~~n r.,i. D' nrgb: 80.90° I,uea loll ~alrnsJ< ~, :.. ~" fL~ met' :~TtT~s oeu ~~>, 3~,-~~5>r, r .. a.. oni mknanixmtVane~ com ryes ra~ww owFe r aFrn~vrvtws • • BP Amoco .. ~w~ ..:di:.. Co-ortlkWelrv~E11lR~aren<e wail Lenee. F-2~. lore Nunn V5ectbnlNV51R eele~e e. ~81~)1 (O~ODN900pE100 fii 90 Meeeuied ReOM Relmxicn }a ]]1b1Y19960p'.00 8790 CakNNwn McBwa. M um CUrveluie - ° ~1° T An: ~ as (F-nmiv¢. F nn) ~~ ro Azimuths to True NoM -- , °~ M MepnaBc North: 24.81° c~ra er ea aaaremn Ow. 7aa°eooa a Magnetic Field Di ple'B0.p0° riceci Twin 7tii+;o~n Bata: 7/27aoo5 ~ •u 1`JO~l3ui 35Io Model: bggm2005 i r..n;m. au mmha»iwi~iman.coin 1lNlU ' - 00 -331. -T?). ~! ~~ 900 2500 2800 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 6000 6100 4200 4300 4400 6500 6800 6700 4800 1900 5000 5100 5200 5300 5600 5500 5600 5700 5800 5900 6000 8100 6200 8300 6400 West(-)IEast(+) [100Win] AM ~ Baker Hughes INTEQ Baker Hughes INTEQ Planning Report ~~ INTEQ Company: BP Amoco Date: 7/28/2005 Timer 11:07:53 Page: Field: Prudhoe Bay Co-ordinate(NE) Reference: WeIL• F-27, True North Site: PB F Pad Vertical (TVD) Reference: 28.2710/13!1986 00:00 67.9 We1L F-27 Section (VS) Reference: Well (O.OON,O.OpE,170.00Azi) Welipath: PIan2, F-27A Survey Calculation Method: , Minimum Curvature Db: OraCle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Weil Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB F Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5972527 .29 ft Latitude: 70 19 55.283 N From: Map Easting: 650960 .70 ft Longitude: 148 46 31.468 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.15 deg Well: F-27 Slot Name: 27 F-27 Well Position: +N/-S 1221.55 ft Northing: 5973783 .00 ft Latitude: 70 20 7.295 N +E/-W 1714.36 ft Fasting : 652650 .00 ft Longitude: 148 45 41.404 W Position Uncertainty: 0.00 ft Welipath: PIan2, F-27A Drilled From: F-27 500292165901 Tie-on Depth: 10300.00 ft Current Datum: 28:27 10/13/1986 00:00 Height 67 .90 ft Above System Datum: Mean Sea Level Magnetic Data: 7/27/2005 Declination: 24.81 deg Field Strength: 57600 nT Mag Dip Angle: 80.90 deg Vertical Section: Depth From (TVD) +NJ-S +E!-W Direction ft ft ft deg 32.40 0.00 0.00 170.00 Plan: Plan #2 Date Composed: 7/27/2005 Version: 7 Principal: Yes Tied-to: From: Definitive Path Targets Map Mep <-- Latitude`---> <-- Longitude -> Name Description TVD +N/-S +EI.W Northing Fasting Deg Min Sec Deg Min Sec Dip.: Dic ft ft ft ft ft F-27A Polygon 67.90 927.70 4400.12 5974800.00 657030.00 70 20 16.406 N 148 43 32.890 W -Polygon 1 67.90 927.70 4400.12 5974800.00 657030.00 70 20 16.406 N 148 43 32.890 W -Polygon 2 67.90 2194.80 4806.02 5976075.00 657410.00 70 20 28.866 N 148 43 21.011 W -Polygon 3 67.90 2311.18 4248.24 5976180.00 656850.00 70 20 30.014 N 148 43 37.303 W -Polygon 4 67.90 1084.29 3833.15 5974945.00 656460.00 70 20 17.949 N 148 43 49.447 W F-27A Fault 1 67.90 1886.33 3645.42 5975743.00 656256.00 70 20 25.838 N 148 43 54.919 W -Polygon 1 67.90 1886.33 3645.42 5975743.00 656256.00 70 20 25.838 N 148 43 54.919 W -Polygon 2 67.90 1924.17 3850.25 5975785.00 656460.00 70 20 26.210 N 148 43 48.935 W F-27A Fault 2 67.90 1108.13 4037.69 5974973.00 656664.00 70 20 18.183 N 148 43 43.472 W -Polygon 1 67.90 1108.13 4037.69 5974973.00 656664.00 70 20 18.183 N 148 43 43.472 W -Polygon 2 67.90 850.88 4095.47 5974717.00 656727.00 70 20 15.653 N 148 43 41.789 W F-27A Target 3 9047.90 942.80 4395.43 5974815.00 657025.00 70 20 16.555 N 148 43 33.027 W F-27A Target 1 9052.90 2224.44 3841.36 5976085.00 656445.00 70 20 29.163 N 148 43 49.190 W F-27A Target 2 9052.90 1861.15 4489.14 5975735.00 657100.00 70 20 25.586 N 148 43 30.273 W Annotation MD TVD ft ft 10300.00 8891.65 TIP 10415.00 8978.97 KOP 10435.00 8993.86 End of 9°/100' DLS ~~ ~ Baker Hughes INTEQ .~ Baker Hughes INTEQ Planning Report icvrEC~ lnnotation MD TVD ft ft 10587.23 9053.08 End of 31 °/100' DLS 11887.23 9053.08 5 12475.00 0.00 TD Plan Section Information MD Inch Aim TVD +Nl-S. +E/-W" DLS Bnild Turo TFO` Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 10300.00 40.18 61.69 8891.65 2097.41 3601.53 0.00 0. 00 0.00 0. 00 10415.00 41.01 60.78 8978.97 2133.42 3667.13 0.89 0. 72 -0.79 324. 15 10435.00 42.81 60.78 8993.86 2139.94 3678.79 9.00 9. 00 0.00 0. 00 10587.23 90.00 60.78 9053.08 2206.13 3797.12 31.00 31. 00 0.00 0. 00 11887.23 90.00 216.78 9053.08 1503.54 4412.62 12.00 0. 00 12.00 90. 00 12475.00 90.94 146.25 9047.52 952.41 4398.02 12.00 0. 16 -12.00 271. 00 Survey MD Incl. ,Azim SS TVD N/S E/W MapN MapE DLS °' VS - TFO Tool ft deg deg ft ft ft ft _ ft deg/100ft ft deg 10300.00 40.18 61.69 8823.75 2097.41 3601.53 5975953.12 656207.83 0.00 -1440.14 0.00 MWD 10325.00 40.36 61.49 8842.83 2105.09 3615.75 5975961.10 656221.89 0.89 -1445.25 324.15 MWD 10350.00 40.54 61.29 8861.85 2112.86 3629.99 5975969.15 656235.96 0.89 -1450.42 324.30 MWD 10375.00 40.72 61.09 8880.82 2120.71 3644.25 5975977.28 656250.06 0.89 -1455.67 324.45 MWD 10400.00 40.90 60.90 8899.75 2128.63 3658.54 5975985.49 656264.19 0.89 -1460.99 324.60 MWD 10415.00 41.01 60.78 8911.07 2133.42 3667.13 5975990.46 656272.67 0.89 -1464.22 324.75 MWD 10425.00 41.91 60.78 8918.57 2136.65 3672.90 5975993.81 656278.39 9.00 -1466.40 360.00 MWD 10435.00 42.81 60.78 8925.96 2139.94 3678.79 5975997.22 656284.20 9.00 -1468.62 0.00 MWD 10450.00 47.46 60.78 8936.54 2145.13 3688.06 5976002.59 656293.37 31.00 -1472.11 0.00 MWD 10475.00 55.21 60.78 8952.14 ..2154.65 3705.08 5976012.46 656310.19 31.00 -1478.54 0.00 MWD ~I 10500.00 62.96 60.78 8964.98 2165.11 3723.79 5976023.30 656328.68 31.00 -1485.59 360.00 MWD 10525.00 70.71 60.78 8974.80 2176.33 3743.83 5976034.91 656348.49 31.00 -1493.15 0.00 MWD 10543.36 76.40 60.78 8980.00 2184.92 3759.20 5976043.82 656363.67 31.00 -1498.95 360.00 F-27A T 10550.00 78.46 60.78 8981.44 2188.08 3764.85 5976047.09 656369.26 31.00 -1501.08 0.00 MWD 10575.00 86.21 60.78 8984.78 2200.17 3786.46 5976059.62 656390.62 31.00 -1509.23 360.00 MWD 10587.23 90.00 60.78 8985.18 2206.13 3797.12 5976065.80 656401.15 31.00 -1513.25 0.00 MWD 10600.00 90.00 62.31 8985.18 2212.22 3808.35 5976072.11 656412.26 12.00 -1517.29 90.00 MWD 10625.00 90.00 65.31 8985.18 2223.25 3830.78 5976083.59 656434.46 12.00 -1524.26 90.00 MWD 10650.00 90.00 68.31 8985:18 2233.09 3853.76 5976093.90 656457.23 12.00 -1529.97 90.00 MWD 10675.00 90.00 71.31 8985.18 2241.72 3877.22 5976103.00 656480.51 12.00 -1534.39 90.00 MWD 10700.00 90.00 74.31 8985.18 2249.10 3901.10 5976110.87 656504.23 12.00 -1537.51 90.00 MWD 10725.00 90.00 77.31 8985.18 2255.23 3925.34 5976117.49 656528.34 12.00 -1539.34 90.00 MWD 10750.00 90.00 80.31 8985.18 2260.08 3949.86 5976122.84 656552.75 12.00 -1539.86 90.00 MWD 10775.00 90.00 83.31 8985.18 2263.64 3974.60 5976126.90 656577.42 12.00 -1539.07 90.00 MWD 10800.00 90.00 86.31 8985.18 2265.90 3999.50 5976129.67 656602.26 12.00 -1536.97 90.00 MWD 10825.00 90.00 89.31 8985.18 2266.85 4024.48 5976131.13 656627.21 12.00 -1533.57 90.00 MWD 10850.00 90.00 92.31 8985.18 2266.50 4049.47 5976131.28 656652.20 12.00 -1528.88 90.00 MWD 10875.00 90.00 95.31 8985.18 2264.84 4074.41 5976130.13 656677.17 12.00 -1522.91 90.00 MWD 10900.00 90.00 98.31 8985.18 2261.87 4099.23 5976127.67 656702.05 12.00 -1515.68 90.00 MWD 10925.00 I 90.00 101.31 8985.18 2257.61 4123.87 5976123.91 656726.76 12.00 -1507.21 90.00 MWD 10950.00 90.00 104.31 8985.18 2252.07 4148.24 5976118.86 656751.24 12.00 -1497.52 90.00 MWD 10975.00 90.00 107.31 8985.18 2245.26 4172.29 5976112.54 656775.42 12.00 -1486.63 90.00 MWD 11000.00 90.00 110.31 8985.18 2237.19 4195.95 5976104.97 656799.24 12.00 -1474.59 90.00 MWD 11025.00 90.00 113.31 8985.18 2227.91 4219.16 5976096.15 656822.63 12.00 -1461.41 90.00 MWD 11050.00 90.00 116.31 8985.18 2217.42 4241.85 5976086.13 656845.53 12.00 -1447.14 90.00 MWD 11075.00 90.00 119.31 8985.18 2205.75 4263.96 5976074.92 656867.87 12.00 -1431.81 90.00 MWD 11100.00 90.00 122.31 8985.18 2192.95 4285.43 5976062.55 656889.59 12.00 -1415.48 90.00 MWD ~, Baker Hughes INTEQ Baker Hughes INTEQ Planning Report ~~ INTEQ _____ Company:-BP"Amoco Date: 7/28/2005 Time: 11:0Tar3 Pagc: 3 Field: Prudhoe Bay Go-ordiaate(NE) Reference: Well: F-27,' True North Site:'. PB F Pad Well: F-27 Vertical (TVD) Reference: 2$ : 27 10/13!1986 00`.00 67.9 Section (VS) Reference: - Wt:11,(O.pON,0.00E,170.00Azi) Wellpath: , PIan2, F-27A Survey Calculation Method: Minimum Curvature Db: OraGe Survey MD Inct Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft -deg deg ft ft ft ft ft de~100ft ft deg 11125.00 90.00 125.31 8985.18 2179.04 4306.20 5976049.07 656910.64 12.00 -1398.17 90.00 MWD 11150.00 90.00 128.31 8985.18 2164.06 4326.21 5976034.50 656930.95 12.00 -1379.94 90.00 MWD 11175.00 90.00 131.31 8985.18 2148.05 4345.41 5976018.89 656950.47 12.00 -1360.85 90.00 MWD 11200.00 90.00 134.31 8985.18 2131.07 4363.75 5976002.28 656969.15 12.00 -1340.93 90.00 MWD 11225.00 90.00 137.31 8985.18 2113.14 4381.17 5975984.72 656986.93 12.00 -1320.26 90.00 MWD 11250.00 90.00 140.31 8985.18 2094.33 4397.63 5975966.25 657003.77 12.00 -1298.87 90.00 MWD 11275.00 90.00 143.31 8985.18 2074.68 4413.09 5975946.92 657019.62 12.00 -1276.84 90.00 MWD 11300.00 90.00 146.31 8985.18 2054.25 4427.49 5975926.79 657034.44 12.00 -1254.22 90.00 MWD 11325.00 90.00 149.31 8985.18 2033.10 4440.81 5975905.91 657048.18 12.00 -1231.07 90.00 MWD 11350.00 90.00 152.31 8985.18 2011.27 4453.00 5975884.34 657060.81 12.00 -1207.46 90.00 MWD 11375.00 90.00 155.31 8985.18 1988.84 4464.03 5975862.14 657072.30 12.00 -1183.46 90.00 MWD 11400.00 90.00 158.31 8985.18 1965.86 4473.87 5975839.37 657082.60 12.00 -1159.12 90.00 MWD 11425.00 90.00 161.31 8985.18 1942.40 4482.50 5975816.09 657091.70 12.00 -1134.52 90.00 MWD 11450.00 90.00 164.31 8985.18 1918.52 4489.88 5975792.37 657099.57 12.00 -1109.71 90.00 MWD 11475.00 90.00 167.31 8985.18 1894.29 4496.01 5975768.26 657106.19 12.00 -1084.78 90.00 M W D 11500.00 90.00 170.31 8985.18 1869.76 4500.86 5975743.85 657111.54 12.00 -1059.79 90.00 MWD 11525.00 90.00 173.31 8985.18 1845.02 4504.42 5975719.18 657115.60 12.00 -1034.81 90.00 MWD 11550.00 90.00 176.31 8985.18 1820.13 4506.68 5975694.34 657118.37 12.00 -1009.90 90.00 MWD 11575.00 90.00 179.31 8985.18 1795.15 4507.63 5975669.39 657119.83 12.00 -985.13 90.00 MWD 11600.00 90.00 182.31 8985.18 1770.15 4507.28 5975644.39 657119.98 12.00 -960.58 90.00 MWD 11625.00 90.00 185.31 8985.18 1745.21 4505.62 5975619.43 657118.83 12.00 -936.31 90.00 MWD 11650.00 90.00 188.31 8985.18 1720.39 4502.65 5975594.55 657116.37 12.00 -912.38 90.00 MWD 11675.00 90.00 191.31 8985.18 1695.76 4498.39 5975569.84 657112.61 12.00 -888.86 90.00 MWD 11700.00 90.00 194.31 8985.18 1671.39 4492.85 5975545.36 657107.57 12.00 -865.82 90.00 MWD 11725.00 90.00 197.31 8985.18 1647.33 4486.04 5975521.18 657101.25 12.00 -843.32 90.00 MWD 11750.00 90.00 200.31 8985.18 1623.67 4477.97 5975497.36 657093.67 12.00 -821.41 90.00 MWD 11775.00 90.00 203.31 8985.18 1600.46 4468.69 5975473.97 657084.86 12.00 -800.17 90.00 MWD 11800.00 90.00 206.31 8985.18 1577.78 4458.20 5975451.07 657074.83 12.00 -779.65 90.00 MWD 11825.00 90.00 209.31 8985.18 1555.67 4446.53 5975428.73 657063.62 12.00 -759.90 90.00 MWD 11850.00 90.00 212.31 8985.18 1534.20 4433.73 5975407.01 657051.26 12.00 -740.98 90.00 MWD 11875.00 90.00 215.31 8985.18 1513.43 4419.82 5975385.96 657037.77 12.00 -722.94 90.00 MWD 11887.23 90.00 216.78 8985.18 1503.54 4412.62 5975375.93 657030.78 12.00 -714.46 90.00 MWD 11900.00 90.03 215.25 8985.18 1493.21 4405.11 5975365.45 657023.48 12.00 -705.59 271.00 MWD 11925.00 90.08 212.25 8985.15 1472.43 4391.23 5975344.39 657010.02 12.00 -687.53 271.00 MWD 11950.00 90.13 209.25 8985.11 1450.94 4378.45 5975322.65 656997.69 12.00 -668.59 271.00 MWD 11975.00 90.18 206.25 8985.04 1428.82 4366.81 5975300.30 656986.50 12.00 -648.83 270.99 MWD 12000.00 90.23 203.25 8984.95 1406.12 4356.34 5975277.39 656976.50 12.00 -628.29 270.98 MWD 12025.00 90.28 200.25 8984.84 1382.90 4347.08 5975253.99 656967.71 12.00 -607.03 270.97 MWD 12050.00 90.33 197.25 8984.70 1359.23 4339.05 5975230.16 656960.16 12.00 -585.11 270.96 MWD 12075.00 90.38 194.25 8984.54 1335.17 4332.26 5975205.97 656953.87 12.00 -562.60 270.94 MWD 12100.00 90.43 191.25 8984.37 1310.79 4326.74 5975181.49 656948.85 12.00 -539.55 270.92 MWD 12125.00 90.48 188.25 8984.17 1286.16 4322.51 5975156.77 656945.12 12.00 -516.02 270.90 MWD 12150.00 90.52 185.25 8983.95 1261.34 4319.57 5975131.90 656942.69 12.00 -492.09 270.88 MWO 12175.00 90.57 182.25 8983.71 1236.39 4317.94 5975106.93 656941.56 12.00 -467.81 270.85 MWD 12200.00 90.61 179.25 8983.46 1211.40 4317.61 5975081.94 656941.74 12.00 -443.25 270.82 MWD 12225.00 90.65 176.25 8983.18 1186.42 4318.59 5975056.99 656943.23 12.00 -418.48 270.79 MWD 12250.00 90.69 173.25 8982.89 1161.53 4320.88 5975032.15 656946.02 12.00 -393.57 270.76 MWD 12275.00 90.73 170.25 8982.58 1136.80 4324.46 5975007.49 656950.11 12.00 -368.59 270.73 MWD 12300.00 90.76 167.25 8982.26 1112.28 4329.34 5974983.08 656955.48 12.00 -343.60 270.69 MWD 12325.00 90.79 164.25 8981.92 1088.05 4335.49 5974958.99 656962.13 12.00 -318.67 270.65 MWD 12350.00 90.82 161.25 8981.56 1064.18 4342.90 5974935.28 656970.02 12.00 -293.88 270.61 MWD 12375.00 90.85 158.25 8981.20 1040.73 4351.55 5974912.01 656979.15 12.00 -269.28 270.57 MWD 12400.00 90.88 155.25 8980.82 1017.77 4361.42 5974889.25 656989.48 12.00 -244.96 270.52 MWD ~, Baker Hughes INTEQ Baker Hughes INTEQ Planning Report ~^ ~~ INTEQ Company: BP Amoco Date: 7/28/2005 Time: 11:07:53 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-27, True North Site: PB F Pad Vertical (TVD) Reference: 2$ . 271011311986 00:00 67.9 Well: F-27 Section (VS) Reference: Well (t).OON,O.OOE,170.OOAzi) Wellpath: PIan2, F-27A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim SS TVD N/S - E/W MapN MapE DLS VS TFO I Tool ft deg deg R ft ft tt ft deg1100ft ft deg 12425.00 90.90 152.25 8980.43 995.35 4372.47 5974867.07 657000.99 12.00 -220.96 270.48 MWD 12450.00 90.92 149.25 8980.03 973.55 4384.68 5974845.51 657013.64 12.00 -197.36 270.43 MWD 12475.00 90.94 146.25 8979.62 952.41 4398.02 5974824.66 657027.40 12.00 -174.23 270.38 MWD • • of blind/shears variable bore pipe 3 1/2"-2 7/8" TOTs -~ of pipe/slips 2 3/8" combi ram/slips Flow Tee • • Memorandum To: F-27 File 186-169 F-27A File 205-??? Fm: Jack Hartz J~ Subj : F-27 Sidetrack Evaluation State of Alaska Oil and Gas Conservation Commission August 9, 2005 F-27 was a zone 1B/2A producer drilled in 1986 as an 80-acre infill well. The well has produced 7.45 MMBO with GOR increasing from SGOR to approximately 46 MCF/Bbl. The well has reached marginal GOR and attempts to cycle it have not proven successful. Decline analysis (attached) indicates approximately 1.5-3 million barrels reserves left in the drainage area, assuming unconstrained production. A conservative exponential decline yields 1.5 MMBO and hyperbolic 3+ MMBO remaining reserves to 100 BOPD limit. F-27A is being sidetracked to the same in zone 1 B geologic level as F-27. The well will be steered to be near the base of the zone 1 B to optimize offtake. The well will have 2000+ feet of horizontal hole, a cemented liner and approximately 1000' of perforations. The peroforated interval will be 750' at its furthest from the original well bore and likely will be closer depending on where perforations are placed. Conclusion: F-27A is being complete within the drainage area of F-27 and will be recovering remaining reserves of 1.5-2.5 MMBO. Recommend approval of the F-27 10-403 and F-27A 10-401 JDH 8/9/2005 • Page 2 10040 PRUDH(7E BAY, PRUDHOE OIL __ I - i ~ _.._ . -000 10~~0 D ~t] 9 0 a m fl ' ~~0 ~dl 'Y'~tcrk.ing Fcrecast parameters F-27 'tease :Oil Case have : F-2' StE~~a' __ ___~ ___ i, C ,W.. ~ _ _ qi :331?-2 iiii r~ :i C~~G1r~005 ~__ -, G2~29i2021 ~ --- - Fina~ Rate ~j_F~~.~r b5ird Cum. Prod. 7:1' 1s' P~Ivi:>ta ----- Cum. Gate Cr;15r?~9~J5 Reserves 194 7? h9M:i;il =UR a'341 ~3 Mhl:irl Fcrecas: _nc~' 6y : ~a:e ---- __ ;y F;,~ecas' Date : Gd;G~a??p~5 10 19A 88 89 40 91 42 43 9~1 4~ 46 97 98 y9 00~ 01 42 43 4~1 0~~ OF 47 08 09 10 l.1 12 13 1~ 15 I6 1l 18 19 20 21 DATE • Page 3 iC~ 10 10' iQ 1a 1t7 is ~a PRUDHOE SAY, PRUDHOE OIL F-27 1-0IL 10 5 1 9 ~~ cl ~;^, i°~ . J.~ X000 ?ay. fl~~ ~00~ I{~U~ 91' 'g3' 'g=~ •g7. gq. G1. 03 0~ • • TERRIE L NUBBLE as-sii252 216 BP EXPLORATION AK INC "Mastercard Check" ~~p PO BOX 196612 MB 7-5 ~.~s, ANCHORAGE, AK 9'9519-6612 DATE PAY TO THE f . ORDER OF DOLLAR First ational Bank Alaska Anchorage, AK 99501 ~ MEMOS ~:L25200060~:99L4~~~6227~~~~55611' 02L6 S • • TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~ Z~ PTD# 2.0 ~J~~~ CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(f), all (per records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 - 70/SO) from records, data and logs acquired for well (name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce/infect is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 04/01/05 C\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT F-27A Program DEV Well bore seg ^ PTD#:2051240 Company BP EXPLORATION~ALASKA) INC Initial Classlfype DEV 11-OIL GeoArea 890 Unit 11650 On1Off Shore On Annular Disposal ^ Administration 1 Permit fee attached Yes 2 Lease numberapprgpriate- - - - - - - - - - - - - - - - - - - - Yes 3 Uniquewell_nameandnumber______________________________________ Yes. .______- 4 Welllocakedin_a_defined_pool_____--__-___---_----_-___-_____ Yes_ ______________ ___ -- - - - - 5 Welllocakedproperdistance_fromdrillingunit_boundary--_---__--__-______ __ Yes_ __________________________________ -- - -- 6 Well locatedproperdistancefromotherwells_______ ___________--__------ Yes_ _---_--_____________-_-___-_-_-______-_--__________ ------------------ 7 Sufficientacreageayailablein_drillingunit--------------__-______________ Yes_ __-_--_---_--__-_-_-_-_------_-_ - - - -- 8 If_deviated,is_wellboreplat_included __________________________________ Yes- ____--._---_--__---_- - -- - -- - - 9 Operator only affected party_--____________________ _______________ Yes- __-_.-._ -- - -- - 10 Operator has.appropriate-bond inforce------ ---~ ---------------- --- Yes ------ -- --- -- -- ------------- -- --- -- -- --- --~ -----...-- ---- 11 Permit_can be issued without conservation order- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - - - - _ _ - - - - . - _ _ - Appr Date 12 Permit_can be issued without administrative-approval - - - - Yes _ - -- - - - - - RPC 8/1012005 13 Can permit be approved before 15-day wait Yes 14 Welllocakedwithinareeand_strataauthorizedby_InjectionOrde[#(put_1O#in-comments)-(Fqr- NA-- -----------------__---__--__-__-_----_--___-_ _______--_--_____--__----- 15 Allwells_wiihin114-mile areaof[eviewidentified(Forservicewellonly)_______________ NA__ -._.-..-__-_____._._-.-,..___.---._..----_--_----------_---_-----.-.- 16 Pre-produced injector: duration of pre production Less than_ 3 months_(For service well only) - - NA - - ---------------------------------------------------------------------- 17 AC_M_P_FindingofConsistency_hasbeenissued-forthisproject____________________ NA__ _-_-.-----_--____----__---__-__--_____--_-_---------_---_----.---,-- Engineering 18 Conductorstring_provided----.__--______________________________ NA__ -__----.__. 19 Surface casing.protects all.known- U$DWs NA - - - - 20 CMT_vol_ adeguate_to circulate_on conductor & surf_csg - _ - - NA_ -- - 21 _C_MT_vol_adeguate-to tie-in long string tosu_rfcsg_______ ____________________ NA-- --__--_-----.- - - - - 22 CMT_willcoyerallknow_np[oductivehorizons______________________________ Yes_ ______Adequateexcess,_________________-______________-___,_ 23 Casing designs adequate for C,T,B&permafrost---._--------------------- Yes_ -__-________________ ------------------------------------------------------ 24 Adequate tankage_or reserve Pit Yes - CTDIJ. - - - - - - 25 If a_re~Jrill, has-a 1.0-403 for abandonment been approved _ _ - . - _ , - - Yes _ - . - - ..' - - - - - 26 Adequatewellboregeparatjon-proposed_________________________________ Yes_ ____---___-_-_-.-_.-_- -------- ---------- ------------------- 27 Ifdiverterrequired,doesitmeetregulations_-_--__--_____________________ NA__ _____Sidetrack.___________ ---------------------------------------- Appr Date 28 Drillingfluid_programschematic&equiplista~equate_________________________ Yes_ ______MaxMW_8,6ppg,_______________________ __--___-_--__--__-- WGA 8110!2005 29 BOPES,dotheymeekregu_lation_____________________________________ Yes_ _--_---_-.---.- 30 BOPE_press rating appropriate; test to_(put prig in comments)_ - - Yes Test to 3500_ psi. _MSP 2320 si._ 31 Choke_manifoldcomplieswlAPI_RP-53(May84)____________________________ Yes_ ____________________________________ 32 Work will occur without operation shutdown___________ ___________________ Yes_ _______-______________________ ------------------------------------------- 33 Is presence of H2S gas_probable - - - - - Yes 100_PPm onpad.- 34 Mechanical condition of wells withinAORyerifedGFor_servicewellonly~-_____-.-___- NA__ ----------------------------------------------_-__--, ------------------- Geology 35 Pe[mitcan be issued w/o hydrogen_sulfidemeosures N_o_ - _ - - - - -- 36 Data-presented on potential overpressure zones_____ ______________________ NA__ __________________ -------------------------------------------------------- Appr Date 37 Seismicanalysis_ofshallowgas_zones--______________________________ NA_- __--__.-____-_-------._ RPC 8110/2005 38 Seabed condjtion survey_(if off-shore) - - _ _ _ - - - - _ - - NA 39 -Contact name/phone_for_weekly progress_reports [exploratory only]- - - - - - - - - - - - - - NA_ - - - Geologic Engineering Public Commissioner: Date: Date Com ' sio r Date Commissioner: ~~ / / ~ ~ ~ ~1IJ ~~~~1`~,~, ~~_Q,S` ~~ ~ >/ :~ • Well History File APPENDIX • Information of detailed nature that is not particularly germane io the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify fording information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. r Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Jan 30 07:55:35 2006 Reel Header Service name .............LISTPE Date .....................06/01/30 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date .....................06/01/30 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003907939 B. JAHN S. NOYNAERT • ~3~~-I ao5- ~a~. Scientific Technical Services Scientific Technical Services F-27A 500292165901 BP Exploration (Alaska) Inc. Sperry Drilling Services 30-JAN-06 MWD RUN 2 MW0003907939 B. JAHN S. NOYNAERT 2 11 13 SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 2249 2195 67.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 4.125 7.000 10419.0 • REMARKS: • 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 10419'MD AND THE BOTTOM WAS AT 10426'MD IN THE ORIGINAL F-27 WELLBORE. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. TIE-IN SGRD DATA WERE ACQUIRED WHILE RIH FOR MWD RUN 1. THESE GR DATA WERE MERGED WITH MWD DATA FROM RUN 1. 5. MWD RUN 2 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (GM) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) A MAD PASS WAS RUN PRIOR TO RUN 2 TO ACQUIRE RESISTIVITY DATA OVER THE RUN 1 INTERVAL. THESE MAD PASS DATA WERE MERGED WITH THE RUN 2 MWD DATA. NO SEPARATE MAD PRESENTATION IS INCLUDED. 6. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN ON 1 SEPTEMBER 2005. THESE DIGITAL DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) VIA E-MAIL ON 25 JANUARY 2006. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 7. MWD RUNS 1 & 2 REPRESENT WELL F-27A WITH API#: 50-029-21659-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12415'MD/8967'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 • EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10202.0 12365.0 RPD 10417.0 12378.5 RPM 10417.0 12378.5 RPS 10417.0 12378.5 RPX 10417.0 12378.5 ROP 10436.5 12410.0 FET 10441.5 12378.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 10202.0 10203.5 10203.5 10205.0 10212.5 10213.5 10219.0 10221.0 10224.0 10225.0 10234.0 10233.0 10414.0 10414.5 10421.0 10422.0 10423.5 10423.5 10427.0 10426.0 10438.0 10438.5 10441.5 10441.5 10455.0 10455.5 10461.5 10463.5 10469.0 10468.5 10476.5 10478.0 10480.5 10481.0 10485.0 10484.5 10489.0 10489.0 10500.0 10499.5 10505.5 10507.0 10507.5 10508.5 10515.0 10516.5 10516.5 10518.5 10522.0 10523.5 10529.5 10529.5 10538.5 10539.5 10550.5 10551.0 10601.5 10603.0 10607.5 10608.5 10613.0 10614.5 10616.0 10617.0 10634.5 10637.0 10648.0 10650.5 10691.5 10692.5 10702.5 10704.0 10806.5 10804.5 10922.0 10920.0 10979.5 10981.0 10998.5 11001.5 11004.0 11005.5 11032.0 11031.5 11041.5 11042.5 11049.5 11050.5 11059.5 11059.0 11068.0 11070.5 11071.5 11075.0 11078.0 11082.0 11082.0 11085.5 r1 J 11095.5 11099.5 11120.0 11135.0 11141.5 11147.5 11179.5 11217.0 11226.5 11246.5 11251.5 11263.0 11271.5 11285.0 11326.0 11339.0 11365.0 11382.0 11401.0 11450.0 11465.0 11472.5 11476.0 11766.5 11783.0 11814.0 11831.0 11845.0 11849.0 11885.5 11893.5 11896.0 11918.0 12030.0 12041.0 12097.0 12144.0 12177.5 12181.0 12197.0 12203.0 12210.5 12220.0 12224.0 12231.5 12275.0 12410.0 MERGED PBU MWD MWD REMARKS DATA SOURCE TOOL CODE 11099.5 11103.5 11121.0 11138.0 11144.0 11150.5 11182.5 11218.0 11230.5 11249.0 11253.5 11263.5 11272.0 11285.0 11326.0 11339.0 11364.5 11384.0 11400.0 11450.0 11467.0 11473.0 11476.5 11765.0 11782.5 11816.0 11829.5 11843.5 11848.0 11881.5 11890.5 11893.0 11916.0 12027.0 12038.5 12099.5 12146.5 12180.5 12183.5 12200.0 12207.0 12216.0 12225.5 12228.5 12235.0 12280.0 12415.0 BIT RUN NO MERGE TOP MERGE BASE 1 10203.5 10585.0 2 10585.0 12414.5 MERGED MAIN PASS. Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... • Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10202 12410 11306 4417 10202 12410 ROP MWD FT/H 0.89 2263.93 110.446 3948 10436.5 12410 GR MWD API 16.15 564.39 59.6892 4010 10202 12365 RPX MWD OHMM 0.89 1898.63 13.4501 3924 10417 12378.5 RPS MWD OHMM 1.24 2000 18.1532 3924 10417 12378.5 RPM MWD OHMM 0.53 2000 20.7202 3924 10417 12378.5 RPD MWD OHMM 0.16 2000 21.6765 3924 10417 12378.5 FET MWD HOUR 0.18 13.21 1.51948 3875 10441.5 12378.5 First Reading For Entire File..........10202 Last Reading For Entire File...........12410 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10203.5 10554.5 ROP 10436.5 10585.0 LOG HEADER DATA DATE LOGGED: 27-AUG-05 • • SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT) 10585.0 TOP LOG INTERVAL (FT) 10436.0 BOTTOM LOG INTERVAL (FT) 10585.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 41.0 MAXIMUM ANGLE: 75.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG015 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 4.125 DRILLER'S CASING DEPTH (FT) 9539.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G) 8.60 MUD VISCOSITY (S) 65.0 MUD PH: 10.0 MUD CHLORIDES (PPM): 26000 FLUID LOSS (C3) 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 145.9 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWDO10 FT/H 4 1 68 4 2 GR MWDO10 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10203.5 10585 10394.3 764 10203.5 10585 ROP MWDO10 FT/H 0.89 154.47 65.0023 298 10436.5 10585 GR MWDO10 API 16.15 564.39 44.8111 383 10203.5 First Reading For Entire File..........10203.5 Last Reading For Entire File...........10585 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 $# FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 10417.5 12383.5 RPM 10417.5 12383.5 RPS 10417.5 12383.5 RPX 10417.5 12383.5 FET 10441.5 12383.5 GR 10555.0 12370.0 ROP 10585.5 12414.5 LOG HEADER DATA DATE LOGGED: 30-AUG-05 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12415.0 TOP LOG INTERVAL (FT) 10585.0 BOTTOM LOG INTERVAL (FT) 12415.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.9 MAXIMUM ANGLE: 94.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 78005 EWR4 Electromag Resis. 4 121887 10554.5 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 4.125 DRILLER'S CASING DEPTH (FT) 9539.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G) 8.60 MUD VISCOSITY (S) 50.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 27000 FLUID LOSS (C3) 5.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) .170 68.5 MUD AT MAX CIRCULATING TERMPERATURE: .070 164.8 MUD FILTRATE AT MT: .160 68.5 MUD CAKE AT MT: .140 68.5 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10417.5 12414.5 11416 3995 10417.5 12414.5 ROP MWD020 FT/H 9.91 2263.93 114.169 3659 10585.5 12414.5 GR MWD020 API 21.92 195.38 60.7547 3631 10555 12370 RPX MWD020 OHMM 0.89 1898.63 13.434 3933 10417.5 12383.5 RPS MWD020 OHMM 1.24 2000 16.876 3933 10417.5 12383.5 RPM MWD020 OHMM 0.53 2000 20.1639 3933 10417.5 12383.5 RPD MWD020 OHMM 0.16 2000 21.9474 3933 10417.5 12383.5 FET MWD020 HOUR 0.18 13.21 1.52859 3885 10441.5 12383.5 First Reading For Entire File..........10417.5 Last Reading For Entire File...........12414.5 t. r C File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......06/01/30 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF Tape Trailer Service name .............LISTPE Date .....................06/01/30 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date .....................06/01/30 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library Physical EOF Physical EOF • Scientific Technical Services Scientific Technical Services End Of LIS File