Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-037
STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI WELL OMPLETION OR RECOMPLETION REPOAND LOG la. Well Status: Oil ❑ Gas 0 SPLUG 0 Other ❑ Abandoned 0 • Suspended ❑ 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG ❑ WDSPL 0 No.of Completions: Zero • Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 7/18/2017 206-037 ' 317-211 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 5/7/2006 50-029-21785-01-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 5/10/2006 PBU C-34A Surface: 1565'FNL,882'FEL,Sec.19,T11N,R14E,UM • 9 Ref Elevations KB 67.51 • 17. Field/Pool(s): Top of Productive Interval: 763'FNL,922'FWL,Sec.20,T11N,R14E,UM GL 36.00 BF 36.97 • PRUDHOE BAY,PRUDHOE OIL • Total Depth: 1836'FNL,214'FWL,Sec.20,T11N,R14E,UM 10. Plug Back Depth(MDITVD): 18. Property Designation: 3388'/3388' ADL 028305 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/ND): 19. DNR Approval Number: Surface:x- 664504 • y- 5959657 • Zone - ASP 4 • 11043'/9031' • 80-274 TPI: x- 666286 y- 5960498 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 665605 y- 5959410 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes ❑ (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) . 9348'/8906' ' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/SGRD/SGRC/SROP,MWD/EWR/SGRD/SGRC/SROP,MGR/CCL/CNL SCANNED JAN 2 5 2018 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" Conductor 33' 113' 33' 113' 8 cu yds Concrete 13-3/8" 68# L-80 33' 2684' 33' 2684' 17-1/2" 3723 cu ft Arctic Set 9-5/8" 47# 1-80 31' 8761' 31' 8409' 12-1/4" 1206 cu ft Class'G',575 cu ft Class'G' 7" 26# 1-80 8460' 9348' 8147' 8906' 8-1/2" 414 cu ft Class'G' 3-1/2"x3-3/16" 8.81#/6.2# L-80 8490' 11043' 8173' 9031' 4-1/8" 174 cu ft Class'G' x2-7/8" /6.16# 24. Open to production or injection? Yes ❑ No 0 25. TUBING RECORD If Yes,list each interval open(MD/ND of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#L-80 4092'-8539' 8433'/8123' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. AM-We N112710 -_,,,,,,,,,p,.. Iti3Y) Was hydraulic fracturing used during completion? Yes ❑ No 0 RECEIVED Per 20 AAC 25.283(i)(2)attach electronic and printed • DATF. Ilion- DEPTH DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED vERwiED 1.4 See Attached ..___.__ AOGCC 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ..... Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate "'""0" Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only V 1/2 /IS' Sir RBDMS AUG 1 7 20172," `• C 28. CORE DATA • Conventional Core(s) Yes 0 No ® . • Sidewall Cores Yes 0 No 0 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Permafrost-Top Well Tested? Yes ❑ No El Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 9558' 9028 separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 21 TS-Zone 2A 9408' 8952' Zone 1B 9558' 9028' Formation at total depth: Zone 1B 9558' 9028' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka,Joseph N Contact Name: Gorham,Bradley M Authorized Title: Info do and Da on er Contact Email: Bradley.Gorham©bp.com Authorized Signature: Date: JI 6/11 Contact Phone: 907-564-4649 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and ND for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • • WELL NAME: C-34A 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9341' 10 Gal Class 'G' 8458' Set Posiset Plug 8450' 5 Gal Class 'G' 8409' - 8414' Tubing Punch 6000' 166 Bbls Class 'G' 3597' - 3602' Tubing Punch 4091' Cut & Pull 5-1/2" x 4-1/2" Tubing 3613' Set EZSV 3582' Set Whipstock 10713' Run 7" 26# L-80 (cement w/ 323 sx Class 'G', 102 sx Class 'G') 3576' Cut & Pull 7" 3415' Set EZSV 3388' Set 2nd Whipstock • • Daily Report of Well Operations C-34A ACTIVITYDATE SUMMARY T/I/O= 123/69/93 Temp=S/I (Pre-rig) Pressure Test TBG to 2005 psi (***PASS***)to verify dome valves are holding (Pre Rig). Pumped 2 bbls of crude to reach a test pressure of 2005 psi. 1st 15 min TBG lost 131, IA gained 9 psi. 2nd 15 min TBG lost 66 psi, IA gained 6 psi 6/16/2017 ***Job continued to 6/17/2017 ***WSR continued from 6/16/2017. Passing TBG pressure test before midnight. Bled back —2 bbls crude. Tag hung on well. DSO notified of well status. 6/17/2017 FWHP= 90/130/142 swab, wing, ssv= closed IA, OA= open to gauge T/I/O=SSV/200/0+, Temp=SI. PPPOT-T(PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test port(500 psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(500 psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, broke free 3 stuck LDS, all moving normal. Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 50 6/17/2017 psi in second 15 min (PASS). Bled void to 0 psi. ***JOB STARTED 27-JUN-2017*** (SLB ELINE CIS MILL/CEMENT/POSISET/TUBING PUNCH) WELL SI ON ARRIVAL. INITIAL T/I/O =200/100/0 PSI. MIRU, LPT/HPT=-PASS. RIH W/ HEAD/WEIGHT(x2)/GO ADAPTER/WELTEC JARS (SET @ —850 LBS)/WELLTEC TRACTOR AND MILLING TOOL. OAL =62'; OAW=480 LBS; MAX OD =2.56" (MILL OD) MILL THROUGH 5-1/2" RQ PLUG, DRIFT 10' BELOW RQ PLUG, PULL UP HOLE, JAR LICK TO PASS THROUGH RESTRICTION, MILL THROUGH PLUG AGAIN, NO MILLING WORK SEEN, PULL UPHOLE WITH SLIGHT OVERPULL, ATTEMPTED TO DRY DRIFT, BUT SAT DOWN ON PLUG. POOH, MILL O.D. VERIFIED AT SURFACE TO BE 2.56". RIH W/ HEAD/ERS/WEIGHT/CCL/18'X 2.125" CEMENT DUMP BAILER FOR DRIFT. OAL =29', OAW=200 LBS, MAX OD = 2.125". TOOLS PASS RQ PLUG FREELY. RIH W/ HEAD/ERS/WEIGHT/CCL/40'X 2.125" CEMENT BAILER. OAL = 59', OAW= 250 LBS, MAX OD =2.125" . DUMP 5 GAL OF CEMENT ON CIBP AT 9372'. TOP OF CEMENT= 9356.3'. RIH W/ HEAD/ERS/WEIGHT/CCL/40'X 2.125" CEMENT BAILER. OAL = 59', OAW=250 LBS, MAX OD = 2.125" . DUMP 5 GAL OF CEMENT ON CIBP AT 9372'. TOP OF CEMENT= 9340.6'. RIH W/ HEAD/CCL/MPBT/POSISET PLUG. OAL= 32'; OAW= 140 LBS; MAX OD = 2.125". PLUG SET WITH GOOD INDICATION FROM SOFTWARE AT 8458'; CCL TO TOP OF PLUG = 21.3'; CCL STOP DEPTH = 8436.7'. SET DOWN —150 LBS ON PLUG TO CONFIRM SET. T/I/O =60/0/0; STABLE BEFORE AND AFTER SETTING. RIH W/HEAD/CCL/40'X 2.125" CEMENT BAILER. OAL = 53', OAW= 250 LBS, MAX OD =2.125" . 6/27/2017 ALL LOGS TIED IN TO BP TUBING SUMMARY DATED 3/8/88. • • Daily Report of Well Operations C-34A ***JOB CONTINUED FROM 28-JUN-2017***(SLB ELINE CIS MILL/CEMENT/POSISET/CEMENT/PUNCHER) CONTINUE RIH W/ HEAD/CCL/40' X 2.125" CEMENT BAILER. OAL = 53', OAW= 250 LBS, MAX O.D. = 2.125" TAG POSISET PLUG AT 8458'. DUMP 5 GAL OF CEMENT ON TOP OF POSISET PLUG. TOP OF CEMENT= 8450.2'. RIH WITH HEAD/SWIVEL/WEIGHT/CCL/MPD/5' TUBING PUNCHER (0 DEG PHASED, 4 SPF, SMALL CHARGES)/BOWSPRING. OAL = 23'; OAW= 180 LBS; MAX OD = 1.69". TIED IN TO 4.5"x 5.5"TUBING SUMMARY DATED 3/8/88. PUNCH TUBING FROM 8408.5' -8413.5'; CCL TO TS = 5.7'; CCL STOP DEPTH = 8402.8'. NO TENSION CHANGE ON PUNCHING. TUBING PRESSURE WAS 270 BEFORE SHOOTING AND BEGAN TO RISE SLOWLY AFTER. WELL SI ON DEPARTURE. FINAL T/I/O = 330/0/0. 6/28/2017 ***JOB COMPLETE 28-JUN-2017*** SLB Cement Services. Job Scope : Fullbore balanced cement plug (P&A). Pumped down TBG through Circ Point @ 8416' MD up IA leaving TOC @ -6000' MD in Tbg/IA. Cement wet @ 1812 hours and in place @ 1905 hours. Location secured, tags hug on MV and IA CSG valve. PCC and DSO notified upon completion of job to close Divert for C-01 flow line. Valve Crew contacted to service tree valves upon departure. NOTE: 100221 (10-60) compliance information in "Fluids Tab". Fluids Calculated in Tubing as follows: Diesel Freeze Protect= Surface to 2693' MD Fresh Water= 2693' MD to 6000" MD 15.8 ppg Class G Cement= 6000' MD to 8411' MD Fluid Calculated in IA: Diesel Freeze Protect= Surface to 2732" MD Fresh Water= 2732' MD to 6000' MD 15.8 ppg Class G Cement= 6000' MD to 8411' MD 7/1/2017 ***Job Complete*** ***WELL S/I ON ARRIVAL***(sidetrack) BRUSH TREE & BPV PROFILE FOR 15mins W/7" BRUSH (No issues). TAG TOP OF CEMENT @ 5,639' SLM W/2.46" CENT, 3' 1-1/2" STEM, 20'x 1-3/4" BAILER (Sample of dry cement). RAN PDS MTT LOGGING TOOL PER PROGRAM (data is questionable, Houston analyst confirm good data) 7/3/2017 ***WELL S/I ON DEPARTURE, PAD OP NOTIFIED*** T/1/0=0/Vac/O, Temp=S/I, (LRS Unit 72 -CMIT-TxIA Post Cement Job, Pre-Jet Cut) CMIT-TxIA***PASSED***to 3534/3526 psi. Target pressure 3500 psi, Max applied 3850 psi (Pre Rig)Attempted 7 CMIT-TxIA tests with passing results on the 7th attempt, see log for details. After the 6th attempt bled TxIAxOA strings down. On the 7th attempt pumped 6 bbls of 50*dsl to reach a CMIT test pressure of 3748 psi on the TBG and 3743 psi on the IA. 1st 15 min TBG lost 144 psi, IA lost 147 psi. 2nd 15 min TBG lost 70 psi, IA lost 70 psi. Bled back- 5.5 bbls of diesel. ***OAP pressured up from 500 to 900 psi during tests#4-6. During Test#7, OAP came up to and held solid at-450 psi*** Tag hung on well. SV, WV,SSV= closed IA, OA= OTG 7/4/2017 FWHP= 605/7/37 • • Daily Report of Well Operations C-34A T/I/O = SSV/0/0. Temp= SI. Job Scope: (Cement C & B lines). No AL. Attempted to get injection down balance line with no luck. Pressure tested balance line to 3100 psi. (Passed). Mix 2,5 gallons of SqueezeCrete and inject into the Control line. Flushed needle valve with couple cups of hydraulic fluid. After 48 hours test control line to 3100 psi. ***Job 7/7/2017 Complete*** ***WELL SHUT IN UPON ARRIVAL***(SLB E-LINE -CUTTER) RU,PJSM,PT. RUN 1: RIH W/ HEAD/WEIGHT/WEIGHT/CCL/JARS/2.50" CENTRALIZER/2.50"x 10' BAILER. RUN 2: RIH W/HEAD/WEIGHT/WEIGHT/CCL/JARS/2.50" CENTRALIZER. RUN 3: RIH W/ HEAD/WEIGHT/WEIGHT/CCL/JARS/2.50" SWEDGE, DRIFT RUN SUCCESSFUL. RUN 4: RIH W/ 1.56"X 5'TUBING PUNCHER, SMALL CHARGES/ILE PUNCH 3597' -3602'4SPF, WITH GOOD INDICATION. BEGIN POOH. ALL LOGS TIED INTO TUBING TALLY. 7/9/2017 ***JOB CONTINUED ON 10-JULY-2017*** T/I/O = SSV/0/0. Temp = SI. PT Control line **PASSED** (Pre RWO). No AL, Wellhouse or flowline. Rig scaffolding installed. PT'ed the cotrol line to 3100 psi. Passed. 7/9/2017 FWPs= SSV/0/0. SV, WV, SSV= C. MV= 0. IA, OA= OTG. 0920 hrs. ***JOB CONTINUED FROM 10-JULY-2017***(SLB E-LINE CUTTER) TAG MILLED DUMMY PLUG @ 2157' WITH TOOLSTRING, UNABLE TO PASS. RETURN TO SURFACE FOR RECONFIGURE. RUN 9: RIH W/ HEAD/WEIGHT/JAR/CCL/RCT ANCHOR SUB/RCT CUTTER SUB/RCT PBA SUB/CENTRALIZER/WEIGHT/2.5" SWEDGE. OAL =38', OAW= 340LBS, MAX OD = 2.5" SAT DOWN AT SAME SPOT. RUN 10: RIH W/HEAD/WEIGHT/JAR/CCL/RCT ANCHOR SUB/RCT CUTTER SUB/RCT PBA SUB/CENTRALIZER/2.5" SWEDGE, OAL = 32', OAW =235 LBS. LOG TIED INTO TUBING TALLY. SAT DOWN AT NIPPLE AT 2157'. ATTEMPTED TO WALK IN TOOL BY BUMPING LINE. POOH. RDMO. PAD OP NOTIFIED ON DEPARTURE. RAP HANDED OVER. WELL SHUT IN ON DEPARTURE. 7/11/2017 ***JOB COMPLETE ON 6-JULY-2017*** ***WELL SHUT IN UPON ARRIVAL***(SLB E-LINE-SEVERING TOOL) RU,PJSM,PT. RIH W/ HEAD/WEIGHT/WEIGHT/CCL/SHOCK MANDREL ASSEMBLY/SEVERING TOOL. OAL= 21', OAW= 175', MAX OD = 2". TIED INTO TUBING TALLEY. 7/11/2017 ***JOB CONTINUED ON 12-JULY-2017*** T/I/0=186200/66 ( Circ Out ) Pumped 2 bbls 50/50 Meth spear down TBG followed by 290 bbls 9.8 brine, taking returns up IA and down C-1 flowline. Notify Pad-op, Hang caution tags. SV,SSV,WV=closed MV=open IA/OA=OTG. FWHP's 0/0/600. Well shut in upon 7/11/2017 departure T/I/O=0/0/0 Temp=S/I CMIT TxIA Passed to 3590/3614 Target pressure of 3500/3500. Pumped 4.4 bbls 1% KCL down IA to reach test pressure, monitored pressure loss for 90 min before starting test(remained above target). After 90 min started CMIT-TxIA had loss of 20/20 psi 1st 15 min and 17/19 psi loss in 2nd 15 min for a total loss of 37/39 psi during 30 min test, bled TxIA to open top tank (too big to measure returns). FWHP=0/0/0 Casing 7/12/2017 valves OTG, All tags hung T/I/O=0/0/0. Pre Parker 272. Set 6" BPV#419 at 135", Good Set. LTT Passed. N/D 6" Upper tree and N/U 6"temp#55 as dryhole, piggyback temp#43 on IA and#71 on OA,. PT tree to 5000 psi and IA/OA piggybacks to 3500 psi. Pass. ***Job Complete***See log. Final WHP's 7/12/2017 BPV/0/0. • • Daily Report of Well Operations C-34A ***JOB CONTINUED FROM 11-JULY-2012***(SLB E-LINE TUBING CUT) JRC DRILL COLLAR SEVERING TOOL DETONATED ACROSS COLLAR AT 4091' POOH, RDMO. 7/12/2017 ***WELL LEFT SHUT IN UPON DEPARTURE*** T/I/O = BPV/ONac. Temp = SI. WHPs (Pre-Rig). Wellhouse, Flowline &SSV removed. 7/15/2017 SV, MV= C. IA, OA= OTG. 04:10 • S North America-ALASKA-BP Page 1 ologt Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/15/2017 16:00 - 17:30 1.50 RIGD P PRE BEGIN EVENT WITH PARKER RIG 272 AT 16:00 GENERAL RIG DOWN OPERATIONS: -SKID CATTLE CHUTE AND RIG FLOOR TO TRAVEL POSITION -LOWER PIPE SKATE -LAY OVER DERRICK;380K ON RACK 17:30 - 18:30 1.00 RIGD P PRE DISCONNECT SERVICE LINES AND ELECTRICAL LINES IN INNER CONNECTS. REMOVE ROOF CAPS AND FLOOR PLATES. TURN TIRES AND INSTALL TIE RODS. 18:30 - 20:00 1.50 RIGD P PRE SPLIT MODULES AND MOVE OFF OF J-28A STAGE ALL THREE MODULES AT ENTRANCE TO THE DRILL SITE FOR MOVE. 20:00 - 23:00 3.00 RIGU P PRE MOVE MODULES FROM J PAD TO C PAD -TOTAL MOVE=5.7 MILES -AVERAGE MOVE TIME FOR 3 HOURS=1.9 MPH 23:00 - 00:00 1.00 RIGU P PRE MOVE RIG ONTO C PAD AND SPOT DRILL MODULE OVER C-34 7/16/2017 00:00 - 02:30 2.50 RIGU P PRE SPOT DRILL MODULE OVER WELL. -REPOSITION DUMMY WELL HOUSE SO THAT MOUSEHOLE CLEARS. -SPOT UTILITY AND MUD MODULES AND BUTTON UP TO DRILL MOD. 02:30 - 03:30 1.00 RIGU P PRE GENERAL RIG UP OPERATIONS -RECONNECT ALL ELECTRICAL AND FLUID INTERCONNECTS -SECURE MOVING SYSTEMS AND INSTALL ROOF PLATES 03:30 - 04:00 0.50 RIGU P PRE RAISE MAST -537 KLBS OFF THE RACK 04:00 - 04:30 0.50 RIGU P PRE SKID RIG FLOOR TO DRILLING POSITION. SKID CATTLE CHUTE AND RAISE PIPE SKATE. 04:30 - 09:00 4.50 RIGU P PRE GENERAL RIG UP OPERATIONS: -RIG UP RIG FLOOR EQUIPMENT,INCLUDING MANRIDERS -BRIDLE DOWN AND RIG UP TOP DRIVE(-1 HOUR) ,-RECONNECT LINES IN INTERCONNECTS -CALIBRATE PVT AND TOTCO SYSTEM WITH QUADCO -HANG TONG LINES AND INSTALL OFFLINE MOUSEHOLES -RIG UP PRESSURE SENSOR TO OAAND SECONDARY KILL LINE TO IA -LOAD FRESH WATER AND 9.8 PPG BRINE IN PITS -COMPLETE RIG WALK AROUND TO CONFIRM HOUSEKEEPING AND READINESS ACCEPT PARKER RIG 272 AT 09:00 ON 7/16/17 Printed ft/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 2 044 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth I Phase Description of Operations (hr) (usft) 09:00 - 10:30 1.50 WHSUR P PRE PRESSURE TEST BPV FROM BELOW TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN :EACH. -TIME DURING INTERVAL ALSO DEDICATED TO COMPLETING RIG UP FOR TESTING BPV AND GENERAL RIG UP THROUGHOUT RIG. -PUMP AND BLEED BACK 5.5 BBLS -PASSING TESTS(SEE ATTACHED CHART) 10:30 - 13:30 3.00 WHSUR P PRE 1 NIPPLE DOWN MCEVOY 13-5/8"X 7-1/16"5K TUBING HEAD ADAPTER AND DOUBLE MASTER 7-1/16"X 6-3/8"5K DRYHOLE TREE -CLEAN AND INSPECT HANGER THREADS. MAKEUP IJ4S XO WITH TORQUED BLANKING PLUG TO HANGER THREADS WITH 6 TURNS. '-FUNCTION AND INSPECTALL LOCKDOWN SCREWS AND GLAND NUTS 13:30 - 17:00 3.50 BOPSUR P PRE NIPPLE UP BOP STACKAND HIGH PRESSURE RISERS. -TORQUE ALL BOLTS TO SPEC OBTAIN RKB MEASUREMENTS -INSTALL MOUSEHOLE -INSTALL TURNBUCKLES AND LOW PRESSURE RISERS AIR UP ALL AIR BOOTS 17:00 - 19:30 2.50 BOPSUR P PRE RIG UP AND ATTEMPT TO PERFORM SHELL TEST ON BOPE MAKE UP TEST JOINT AND BOPE TEST EQUIPMENT -FILL STACK AND PURGE AIR FROM SYSTEM -ATTEMPT SHELL TEST;OBSERVE SIGNIFICANT PRESSURE DROP -BEGIN TROUBLESHOOTING AND ISOLATING SURFACE EQUIPMENT,NO LEAKS FOUND 1-OBSERVE FLUID COMING OUT OF IA. -COME UP QUICKLY TO 2000 PSI TO"SET THE BALL ON THE BLANKING SUB, CORRESPONDING INCREASE IN FLUID OUT THE IA. 19:30 - 20:00 0.50 BOPSUR P PRE HOLD RIG EVACUATION DRILLAND AAR WITH RIG CREW. 20:00 - 20:30 0.50 BOPSUR P PRE ,SERVICE TOP DRIVE,RIG FLOOR EQUIPMENT AND PIPE CAT 20:30 - 21:30 1.00 WHSUR N PRE 1 TROUBLESHOOT BLANKING PLUG AND XO THREADS WITH CAMERON WELLHEAD REPRESENTATIVE WELLHEAD REPRESENTATIVE REPLACED BALL ON BLANKING PLUG '-RE-INSTALL BLANKING PLUG AND MAKE UP -PERFORM SHELL TEST ON BOPE STACK 250/3500 PSI FOR 5 MIN EACH,GOOD TEST. 21:30 - 00:00 2.50 BOPSUR P PRE PRESSURE TEST BOPE 250/3500 PSI FOR 5/5 CHARTED MIN EACH PER AOGCC AND BP REQUIREMENTS SEE COMMENTS ON NEXT PAGE.TEST COMPLETED 7/17/17 AT 02:30. TEST WITNESS WAIVED BYAOGCC REPRESENTATIVE LOU LAUBENSTEIN AT 11:04 ON 7/16/2017 Printed 8/11/2017 10:12:37AM "All depths reported in Drillers Depths* • North America.-ALASKA BP • Page 3 Oft. Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) I (usft) 7/17/2017 00:00 - 02:30 2.50 BOPSUR P PRE CONTINUE TO PRESSURE TEST BOPE 250/3500 PSI FOR 5/5 CHARTED MIN EACH PERAOGCCAND BP REQUIREMENTS -TEST UPPER RAMS(4-1/2"x 7"VBR)WITH 5" AND 4-1/2"TEST JOINT -TEST LOWER PIPE RAMS(2-7/8"x 5"VBR) IWITH 4-1/2"AND 4"TEST JOINT -TEST ANNULAR PREVENTER WITH 5-1/2" AND 4"TEST JOINT -TEST BLIND/SHEARS -TEST RAM-LOCKS ON UPPER RAMS, BLIND/SHEAR RAMS,AND LOWER PIPE RAMS -TEST ALL CHOKE MANIFOLD VALVES, SUPER-CHOKE AND MANUAL CHOKE. TEST 1APPLICABLE VALVES FROM BACKSIDE TEST KILL AND CHOKE HCRS AND MANUAL VALVES -TEST NC50 AND HT-38 FOSV.ONE FAIUPASS ON HT-38 FOSV,NOT FULLY CLOSED -PERFORM ACCUMULATOR DRAW-DOWN TEST -TEST ALARMS,PVT AND FLOW SHOW -TEST WITNESS WAIVED BYAOGCC REPRESENTATIVE LOU LAUBENSTEIN AT 11:04 ON 7/16/2017 -SEE ATTACHED TEST DOCUMENTATION 02:30 - 03:00 0.50 BOPSUR P PRE BLOW DOWN AND RIG DOWN ALL TEST EQUIPMENT 03:00 - 04:00 1.00 WHSUR P 1 DECOMP MAKE UP LUBRICATOR AND DUTCH RISER, TO PULL BLANKING PLUG AND BPV,AND PRESSURE TEST -INSTALL DUTCH RISER AND LUBRICATOR WITH QUICK TEST SUB -PRESSURE TEST 250/3500 PSI FOR 5/5 MIN EACH:GOOD TEST 04:00 - 05:30 1.50 WHSUR P DECOMP PULLAND LAY DOWN BLANKING PLUG AND BPV -BREAK AT QUICK TEST SUB AND RETRIEVE BLANKING PLUG WITH DRILL PIPE -MAKE UP LUBRICATOR AND PT QUICK TEST SUB -PULL AND LAY DOWN BPV -BREAK DOWN AND LAY DOWN DUTCH 'RISER AND LUBRICATOR 05:30 - 06:30 1.00 WHSUR P DECOMP RIG UP TO PULL 5-1/2"x 4-1/2"TAPERED TUBING STRING -RIG UP CASING TONGS -MAKE UP SCHLUMBERGER SPEAR ASSEMBLY TO PULL TUBING HANGER 06:30 - 07:30 1.00 WHSUR P DECOMP SPEAR AND PULL TUBING HANGER TO RIG FLOOR -ENGAGE SPEAR IN HANGER AND CONFIRM NO PRESSURE BELOW HANGER -BACK OUT LOCK DOWN SCREWS ON TUBING HANGER -UNSEAT HANGER WITH 113 KLBS,PULL THROUGH STACK WITH 90 KLBS Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* ONorth America-ALASKA-BP Page 4d,F1t Operation Summary Report Common Wet Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 07:30 - 08:30 1.00 WHSUR P 4,091.00 DECOMP CIRCULATE BOTTOMS UP WITH SPEAR ENGAGED IN TUBING HANGER -500 GPM,2000 PSI -FLOW CHECK WELL FOR 10 MIN,STATIC SIMOPS:RIG UP SCHLUMBERGER SPOOLING UNIT FOR CONTROL LINE 08:30 - 14:00 5.50 WHSUR P 4,091.00 DECOMP PULL AND LAY DOWN 5-1/2"x 4-1/2"TUBING FROM CUT AT 4091'MD -DISENGAGE SPEAR AND LAY DOWN SPEAR AND TUBING HANGER -RECOVER:(1)HANGER ASSEMBLY,(62)JTS 5-1/2",17#,BUTT TUBING,(1)SSSV WITH FLOW COUPLINGS AND HANDLING PUPS, (-2500')OF CONTROL LINE,(26)CLAMPS AND (5)SS BANDS,(1)GLM 1MTH HANDLING PUPS,(40)JTS 4-1/2",12.6#,BUTT TUBING. 14:00 - 14:30 0.50 WHSUR P 4,091.00 DECOMP RIG DOWN TUBING HANDLING EQUIPMENT 14:30 - 16:00 1.50 BOPSUR P 4,091.00 DECOMP CHANGE UPPER PIPE RAMS FROM 4-1/2"x 7" VBR TO 2-7/8"x 5"VBR -CLOSE BLIND/SHEAR RAMS AND RUN IN MANUAL RAM LOCKS CHANGE UPPER PIPE RAMS -DISENGAGE RAM LOCKS AND OPEN BLIND/SHEAR RAMS 16:00 - 17:00 1.00 BOPSUR P 4,091.00 DECOMP RIG UP AND TEST UPPER PIPE RAMS WITH 4" TEST JOINT TO 250/3500 PSI FOR 5/5 CHARTED MIN -INSTALL TEST PLUG AND RUN IN LOCK DOWNS -ATTEMPT TO TEST UPPER RAMS,FLUID LEAKING BY TEST PLUG 17:00 - 19:00 2.00 BOPSUR N 4,091.00 DECOMP TROUBLESHOOT FLUID BYPASSING TEST PLUG -PULL AND RESEAT PLUG WITH SAME RESULTS -PULL TEST PLUG AND CHANGE OUT WITH SECOND TEST PLUG BROUGHT BY CAMERON REPRESENTATIVE -INSTALL NEW TEST PLUG AND RUN IN LOCK DOWN SCREWS PER CAMERON REPRESENTATIVE 19:00 - 20:00 1.00 BOPSUR P 4,091.00 DECOMP PRESSURE TEST UPPER PIPE RAMS 250/3500 PSI WITH 4"TEST JOINT FOR 5/5 MIN EACH -GOOD TEST. -BACK OUT LOCK DOWNS AND PULL TEST PLUG -INSTALL WEAR RING AND LAY DOWN TEST JOINT. 20:00 - 00:00 4.00 STWHIP P 4,091.00 WEXIT MAKE UP AND RUN IN THE HOLE WITH 9-5/8" EZSV TO 1504'MD -MAKE UP EZSV PER HALLIBURTON REPRESENTATIVE RUN IN THE HOLE,PICKING UP DRILL COLLARS(9)AND HWDP(27)TO BE USED FOR WHIPSTOCK/WINDOW MILLING RUN TO 1125'MD -CONTINUE IN THE HOLE PICKING UP 4" DRILL PIPE SINGLES FROM 1125'MD TO 1504' MD -PU 102 KLBS,SO 99 KLBS AT 1504'MD Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 5 61 Operation Summary Report Common Well Name:C-34 AFE No —Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/18/2017 00:00 - 02:30 2.50 DHB P 4,091.00 WEXIT CONTINUE TO RUN IN THE HOLE WITH 9-5/8" EZSV FROM 1504'MD TO 3613'MD(TOP OF EZSV) RUN IN THE HOLE PICKING UP 4"DRILL PIPE SINGLES FROM 1504'MD TO 3613'MD -PU 125 KLBS,SO 129 KLBS AT 3613'MD 02:30 - 03:00 0.50 DHB P 3,613.00 WEXIT ,SET 9-5/8"EZSV PER HALLIBURTON REPRESENTATIVE AT 3614.5'CENTER OF ELEMENT(3613'MD TOP OF PLUG) -36 RIGHT HAND TURNS -PICK UP IN 15 KLBS INCREMENTS AND HOLD FOR 2 MIN EACH -OBSERVE PACKER SET AND SHEAR OFF AT 175 KLBS(50 KLBS OVERPULL) -PICK UP 5'TO CLEAR PLUG,SLACK OFF AND TAG TOP OF PLUG AT 3613'MD WITH 5 KLBS TO VERIFY PLUG SET 03:00 - 03:30 0.50 DHB P 3,613.00 WEXIT DISPLACE WELL TO 9.4 PPG LSND MILLING FLUID PER OCN#1 10 BPM,530 PSI i-MONITOR WELL FOR 10 MIN,STATIC 03:30 - 05:30 2.00 DHB P 3,613.00 WEXIT PULL OUT OF THE HOLE WITH EZSV RUNNING TOOL FROM 3613'MD TO SURFACE .-STAND BACK 4"DRILL PIPE,5"HWDP AND 6-1/2"COLLARS IN DERRICK FOR WHIPSTOCK/WINDOW MILLING BHA 05:30 - 07:00 1.50 DHB P 3,613.00 WEXIT PRESSURE TEST 9-5/8"CASING 250/3500 PSI FOR 5/30 CHARTED MIN(PASSING TESTS PER 100218 3B CRITERIA,SEE ATTACHED DOCUMENTATION) -PUMP 4.5 BBLS,BLEED BACK 4.5 BBLS 9.4 PPG LSND,50°F AMBIENT TEMP -LOSE 20 PSI IN FIRST 15 MIN,10 PSI IN SECOND 15 MIN APPROVED BY WSUP THROUGH EMAIL 07:00 - 10:00 3.00 STWHIP P 3,613.00 WEXIT I MAKEUP 9-5/8"SLB TRACKMASTER SINGLE RUN WHIPSTOCK FROM SURFACE TO BHA OVERALL LENGTH AT 1225'MD. 1-(28)JOINTS 5"HWDP AND(9)6-1/2"STEEL DRILL COLLARS,PORTED FLOAT,UBHO SUB, NO MWD -SCRIBE UBHO TO WHIPSTOCK SLIDE(DD AND GYRODATA CONFIRM) 10:00 - 12:00 2.00 STWHIP P 3,613.00 WEXIT TRIP IN THE HOLE WITH SLB 9-5/8" WHIPSTOCK AND MILL ASSEMBLY FROM BHA AT 1225'MD TO 3587'MD(26'ABOVE EZSV) -RUNNING SPEED=45 FPM(CONSERVATIVE FOR 35K LBS SHEAR PIN IN WHIPSTOCK -RIG UP SPERRY E-LINE UNIT DURING TRIP IN HOLE Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 6 Of 51 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: 1iX3-018KN-C:(7,849,204.00) Project:Prudhoe Bay I Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 14:00 2.00 STWHIP P 3,613.00 WEXIT ORIENT AND SET WHIPSTOCK WITH GYRO AT 3587 MD(TOP OF SLIDE) -ORIENT WHIPSTOCK TO ALIGN SLIDE AT I 200°TOOLFACE(TARGET PER WELL PROGRAM DIRECTIONAL PLAN=208°) -TAG EZSV AT 3613'MD TO ACTIVATE ACHOR (SET DOWN 10 KLBS) PULL UP HOLE 8'TO SET DEPTH(COLLARS LOCATED USING PRE-RIG MTT LOG+17' DEPTH SHIFT FOR P272 RKB VS N18E RKB) -TOP COLLAR=3571'MD -TOP OF SLIDE=3582'MD ' -BOTTOM OF SLIDE=3596'MD(14'RAMP) -BASE OF WHIPSTOCK=3605'MD -BOTTOM COLLAR=3610'MD CONFIRM ANCHOR SET WITH 10 KLBS ,DOWN -SHEAR MILLS OFF WHIPSTOCK WITH 35 KLBS(35 KLBS PLANNED SHEAR PIN) -RECORD SLOW PUMP RATES Jik‘I2A— 14:00 - 23:00 9.00 STWHIP P 3,616.00 ' WEXIT MILL WINDOW IN 9-5/8"CASING PER SLB C-345�1 FISHING REP FROM 3582'MD TO 3616'MD(20' li75 FROM BASE OF WINDOW TO MEET MINIMUM AOGCC REQUIREMENTS) -SHUT INNER MANUAL VALVES ON BOP STACK AND ENSURE DITCH MAGNETS IN POSSUM BELLY AND TROUGHS : '-425 GPM;750-750 PSI,90 RPM;2-6/2-3 ' KFT-LBS TORQUE ON/OFF,3-10 KLBS WOB -PU/SO/ROT=130/1129/128 KLBS MW IN/OUT=9.4 PPG NO CEMENT OBSERVED BEHIND CASING WHIPSTOCK INTENDED TO BE SET IN LOWER SV3 TO ALLOW FOR LOT IN SHALE PACKAGE AT BASE OF SV2. AFTER DRILLING I OUT,LATER CONFIRMED THAT WINDOW WAS MILLED IN UPPER SANDS OF SV2. WORK MILLS THROUGH WINDOW WITH AND WITHOUT ROTATION AND WITH AND WITHOUT PUMPS SEVERAL TIMES-NO SIGNIFICANT TORQUE OR DRAG NOTICED. WINDOW LOOKS GOOD. 23:00 - 00:00 1.00 STWHIP P 3,616.00 WEXIT CIRCULATE 2 BOTTOMS UP,ENSURE MUD WEIGHT IN/OUT 9.4 PPG FOR LOT -425 GPM;750 PSI,90 RPM;1.5KFT-LBS ' ,TORQUE -RECIPROCATE PIPE DURING CIRCULATION. j -PUMP 30 BBL HIGH VIS SWEEP FOR HOLE CLEANING,NO SIGNIFICANT INCREASE IN 'CUTTINGS BACK AT SHAKERS. , -MONITOR WELL FOR 10 MIN AFTER CIRCULATING;STATIC Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 7 afo Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT Total Depth I Phase Description of Operations (hr) (usft) 7/19/2017 00:00 - 01:00 1.00 STWHIP P 3,616.00 WEXIT PERFORM LOT TO 12.7 PPG EMW IN SV2 FORMATION(SAND) -SPACEOUT WITH MILLS INSIDE WINDOW AND CLOSE UPPER PIPE RAMS -MW=9.4 PPG,3582'TVD,3582'MD -PUMP 1.6 BBLS TO 725 PSI AT 1 BPM -MONITOR PRESSURE STABILIZATION FOR 10 MIN(BLEEDS DOWN TO 77 PSI) -BLEED OFF PRESSURE TO TRIP TANK 1.6 BBLS PUMPED,1.6 BBL RETURNED -MONITOR WELL FOR 10 MIN FOLLOWING TEST AND PRIOR TO PULLING OUT OF THE HOLE(STATIC) -RECEIVE APPROVAL TO PROCEED FROM ODE,SEE ATTACHED DOCUMENTATION. j-OBSERVE PRESSURE INCREASE ON OA DURING TEST RELATED TO COMPRESSION (NO PRESSURE TRANSMISSION OBSERVED TO OA,I.E.OA PRESSURE INCREASES 60 PSI TO 520 PSI WHILE WELLBORE LOT PRESSURE IS-725 PSI). j-13.2 PPG EMW EXCEEDS MINIMUM 12.7 PPG LOT REQUIREMENT FOR 25 BBLS KT FOR HOLE SECTION 01:00 - 02:00 1.00 STWHIP P 3,616.00 WEXIT I PULL OUT OF THE HOLE FROM THE TOW AT 3582'MD TO THE TOP OF THE BHAAT 1225' MD -MONITOR DISPLACEMENT WITH THE TRIP TANK(CORRECT DISPLACEMENT) -MONITOR THE WELL FOR 10 MIN BEFORE PULLING NON-SHEARABLES(STATIC) 02:00 - 05:00 3.00 STWHIP P 3,616.00 WEXIT LAY DOWN SLB TRACKMASTER 9-5/8" WINDOW MILLING ASSEMBLY FROM 1225'MD ,TO SURFACE. -RACK BACK 5"HWDP. LAYDOWN 6-1/2"DC. -LOWER MILL-1/8"UNDER -MIDDLE MILL-1/16"UNDER -UPPER MILL-IN GUAGE. -FLUSH STACK AND CHOKE MANIFOLD 05:00 - 09:30 4.50 DRILL P 3,616.00 INTI MAKEUP 8-1/2"MOTOR DRILLING ASSEMBLY 'WITH GWD FROM SURFACE TO 840'MD -8-1/2"NEW HUGHES GX117 MILL TOOTH ROLLER CONE BIT,SERIAL#5267109 -6-3/4"1.3°BENT ULTRA X-TREME MUD MOTOR,PORTED FLOAT,GYRO, DI R/G R/RES/PWDNSS 09:30 - 12:00 2.50 DRILL P 3,616.00 INTI TRIP IN THE HOLE FROM THE TOP OF THE BHAAT 840'MD TO THE TOP OF THE WINDOW AT 3582'MD -SHALLOW HOLE TEST DIRECTIONAL TOOLS AT 1303'MD,550 GPM,1400 PSI. -MONITOR DISPLACEMENT ON TRIP TANKS (CORRECT DISPLACEMENT) 12:00 - 13:00 1.00 DRILL P 3,616.00 INTI SLIP AND CUT 80'OF DRILLING LINE -CALIBRATE BLOCK HEIGHT WITH AMPHION AND BAKER SYSTEMS -SERVICE RIG AND CHANGE OUT DRAVWVORKS ENCODER ,13:00 - 13:30 0.50 DRILL P 3,616.00 INTI ESTABLISH ECD AND DRILLING PARAMERTERS PER BAKER MWD/DD -550 GPM,1350 PSI Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Pa9e 8 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 13:30 - 16:30 ! 3.00 DRILL N 3,616.00 INTI TROUBLESHOOT GYRO DOWNHOLE TOOL 1 PER MWD AND GYRO REP UNABLE TO OBTAIN GYRO SURVEY FROM GWD TOOL ',-DECISION MADE TO PULL OUT OF THE HOLE AND CHANGE OUT GWD MONITOR WELL FOR 10 MIN PRIOR TO POH (STATIC) 16:30 - 17:30 1.00 DRILL N 3,616.00 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM THE TOP OF THE WINDOW AT 3582'MD TO THE TOP OF THE BHAAT 840'MD -MONITOR DISPLACEMENT WITH THE TRIP TANK -MONITOR THE WELL FOR 10 MIN BEFORE PULLING NON-SHEARABLES(STATIC) 17:30 - 19:00 1.50 DRILL N 3,616.00 INTI PULL OUT OF THE HOLE FROM THE TOP OF THE BHA AT 840'MD TO SURFACE -LAY DOWN THE ONTRAK AND GWD 19:00 - 22:30 3.50 DRILL N 3,616.00 INTI RUN IN THE HOLE TO THE TOP OF THE BHA AT 840'MD -MAKE UP NEW ONTRAKAND GWD 22:30 - 00:00 1.50 DRILL N 3,616.00 INTI TRIP IN THE HOLE FROM THE TOP OF THE BHAAT 840'MD TO 3400'MD AT MIDNIGHT SHALLOW HOLE TEST DIRECTIONAL TOOLS AT 1000'MD,600 GPM,1175 PSI. -MONITOR DISPLACEMENT ON TRIP TANKS (CORRECT DISPLACEMENT) 7/20/2017 00:00 - 01:00 1.00 DRILL N 3,616.00 INTI TRIP IN THE HOLE FROM 3400'MD AT MIDNIGHT TO BOTTOM AT 3616'MD -MONITOR DISPLACEMENT ON TRIP TANKS. -OBTAIN ECD BENCHMARKS 01:00 - 14:30 13.50 DRILL P 4,240.00 INTI DIRECTIONAL DRILL 8-1/2"INT BUILD SECTION FROM 3616'MD TO 4240'MD,4208' TVD(624'IN 13.5 HRS=46 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=100-175 FPH -550 GPM; 1750 PSI ON,1640 PSI OFF -40 RPM WITH 2K TQ ON/OFF.-UP TO 12 K WOB -PU-123K,SO-120K,ROT-120K -MUD WEIGHT IN/OUT 9.4 PPG -SURVEY EVERY 100'FOR DOGLEGS< 5°/100' -SURVEY EVERY 30'FOR DOGLEGS>5°/100' -SOFTSPEED ACTIVE FOR DRILLING INTERVAL -GAS WATCH:AVERAGE BACKGROUND= 0-43 UNITS,MAXIMUM=91 UNITS -35 BBL,1.5 PPG OVER WEIGHTED SWEEP PUMPED AT 4050'MD,SLIGHT INCREASE IN CUTTINGS BACK AT SHAKERS. -OBSERVED 6.2°DLS ON SURVEY AT 3723' MD, PICKED UP AND SHOT SURVEYS AT 30' INTERVALS PER JORPS PROCEDURE REVEALING 3.91°DLS AT 3661'MD,6.31°DLS AT 3692'MD,AND 8.64°DLS AT 3723'MD. NOTIFIED WSUP AND ODE FOR DLS BEING OUT OF THE BOD AND THE BOUNDRY CONDITIONS SET BY THE WSUP. Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 9 On Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. j BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT Total Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 DRILL P 4,240.00 INTI CIRCULATE HOLE CLEAN WITH 2X BOTTOMS UP -550 GPM,1650 PSI -40 RPM,2K TORQUE -PUMPED 35 BBL HIGH VIS SWEEP,NO INCREASE IN CUTTINGS BACK AT SHAKERS. 16:00 - 17:30 1.50 DRILL P 4,240.00 INTI PULL OUT OF THE HOLE FOR PLANNED BHA SWAP FROM BOTTOM AT 4240'MD TO THE TOP OF THE BHAAT 850'MD. -MONITOR HOLE FILL ON TRIP TANKS(HOLE TAKING PROPER FILL) -MONITOR WELL FOR 10 MIN AT THE TOP OF THE WINDOW(STATIC) 17:30 - 19:30 2.00 DRILL P 4,240.00 INTI PULL OUT OF THE HOLE AND RACK BACK/LAY DOWN BHAAS NEEDED FROM 850'MD TO (SURFACE -MONITOR WELL PRIOR TO PULLING NONSHEARABLES INTO BOP STACK(STATIC) -LAY DOWN GYRO,MOTOR,AND TRICONE BIT -BIT GRADE 1-1-WT-A-E-I-ER-BHA -MONITOR HOLE FILL ON TRIP TANKS(HOLE TAKING PROPER FILL) CLEAN AND CLEAR RIG FLOOR 19:30 - 22:30 3.00 DRILL P 4,240.00 INTI MAKE UP BHA PER BAKER MWD/DD FROM SURFACE TO 892'MD PICK UP 8-1/2"MM65M PDC BIT AND AUTOTRAK RSS 1-MONITOR DISPLACEMENT ON TRIP TANKS (CORRECT DISPLACEMENT) 22:30 - 00:00 1.50 DRILL P 4,240.00 INTI TRIP IN THE HOLE FROM THE TOP OF THE j BHAAT 892'MD TO 3359'MD AT MIDNIGHT. -MONITOR DISPLACEMENT ON THE TRIP TANKS(CORRECT DISPLACEMENT) 7/21/2017 00:00 - 01:00 1.00 DRILL P 4,240.00 INTI TRIP IN THE HOLE FROM 3359'MD AT MIDNIGHT TO BOTTOM AT 4240'MD. -MONITOR DISPLACEMENT ON TRIP TANKS _ _ (CORRECT DISPLACEMENT) Printed 8/11/2017 10:12:37AM •AII depths reported in Drillers Depths* 110 • North America-ALASKA-BP Page 10 etj, Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay I Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00 OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. I BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT Total Depth Phase Description of Operations (hr) (usft) 01:00 - 10:00 9.00 DRILL P 5,132.00 INTI I DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 4240'MD TO 5132'MD IN SV1 .AND UGNU 4/4N3 FORMATIONS(892'IN 9 HRS=99 FPH WITH CONNECTIONS) '-INSTANTANEOUS ROP=150-250 FPH -550 GPM(1750-1975 PSI ON BOTTOM-600 1 GPM AT 8AM(2250-2325 PSI ON BTM),120-140 j RPM,2-4.5 K FT-LB TQ ON/OFF,UP TO 14 KLBS WOB -MUD WEIGHT IN/OUT 9.4 PPG,NO LOSSES -ECD ACTUAL-10.35 PPG,CALCULATED CLEAN HOLE 10.0 PPG -SURVEY EVERY 95'STAND SOFTSPEED ACTIVE FOR DRILLING INTERVAL GAS WATCH:AVERAGE BACKGROUND= 0-180 UNITS,MAXIMUM=509 UNIT(FIRST BU AT TOP OF UGNU,CORRESPONDING TO COAL) PUMPED SWEEPS AS FOLLOWS: -4785'MD:35 BBL WEIGHTED 1.5 PPG OVER, 75%INCREASE IN CUTTINGS BACK AT SHAKERS 10:00 - 15:00 5.00 DRILL P 5,162.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE FROM 5132'MD TO 5162'MD IN UGNU3 FORMATION I-STACK OUT WEIGHT AND SEE PUMP PRESSURE SPIKE AT 5132'MD WHILE DRILLING AHEAD AT 230 FPH. -SPEND 2.5 HOURS VARYING PARAMETERS IN ATTEMPT TO DRILL AHEAD. SUSPECT BIT BALLING AFTER HITTING SILTSTONE OR POSSIBLE BENTONITE STRINGER -40-160 RPM,4-18 KLBS WOB, I OCCASIONAL RE-SEATS OF BIT -PUMP 40 BBL DRILL-N-SLIDE SWEEP FOR BIT BALLING -ABLE TO MAKE 14'OF HOLE PRIOR TO STACKING OUT WEIGHT AGAIN -SPEND ADDITIONAL 2 HOURS VARYING PARAMETERS IN ATTEMPT TO DRILLAHEAD. SUSPECT BIT BALLING(LOGS EVENTUALLY SHOW SILTSTONE ACROSS TROUBLE AREA) -40-160 RPM,4-18 KLBS WOB, OCCASIONAL RE-SEATS OF BIT -CLOSE RIBS ON AUTOTRAK AND RECIPROCATE FULL STAND TWICE -PUMP 40 BBL DRILL-N-SLIDE LUBE PILL WITH 8 PPB WALL-NUT -OBSERVE WOB INSTANTLY DROP OFF WHEN DROPPING FROM 140 TO 75 RPM. ABLE TO RE-STAGE UP RPM AND ROP TO NORMAL PARAMETERS AT 5162'MD. -NO COAL OBSERVED AT SHAKERS Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* North America-ALASKA-BP Page 11 OM Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: IX3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM I Rig Release: Rig Contractor:PARKER DRILLING CO. I BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To j Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 15.00 18:00 3.00 DRILL P 5,522.00 r INTI I DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 5162'MD TO 5522'MD IN UGN3 FORMATION(346'IN 3 HRS=115 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=30-230 FPH -600 GPM,2300-2700 PSI ON BTM PRESSURE,140 RPM,4-6/3-4 KFT-LBS TQ ON/OFF BTM,UP TO 18 KLBS WOB -MUD WEIGHT IN/OUT 9.4 PPG,NO LOSSES -ECD ACTUAL-10.48 PPG,CALCULATED CLEAN HOLE 9.98 PPG SURVEY EVERY 95'STAND -SOFTSPEED ACTIVE FOR DRILLING INTERVAL -GAS WATCH:AVERAGE BACKGROUND= 100-200 UNITS,MAXIMUM=277 UNITS 18:00 - 21:30 3.50 DRILL P 5,611.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE FROM 5522'MD TO 5611'MD IN UGNU3 FORMATION STACK OUT WEIGHT AND SEE PUMP PRESSURE SPIKE AT 5522'MD WHILE DRILLING AHEAD AT 230 FPH -VERY ERRATIC TORQUE,STICK-SLIP AND VIBRATION WORKING THROUGH INTERVAL (LOGS EVENTUALLY SHOW SAND 5521'-5531' MD FOLLOWED BY SHALE). -VARY PARAMETERS ATTEMPTING TO DRILL AHEAD;3-25 KLBS WOB,70-140 RPM -PUMP 40 BBL SWEEP WITH 8 PPB WALL-NUT -NO COAL OBSERVED AT SHAKERS 21:30 - 00:00 2.50 DRILL P 5,872.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 5611'MD TO 5872'MD IN THE UGNU 3/1 FORMATIONS(261'IN 2.5 HRS=105 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=175-200 FPH -600 GPM,2500-2700 PSI ON BTM,100-140 RPM,5-8/4-5 KFT-LBS TQ ON/OFF,UP TO 20 KLBS WOB -MUD WEIGHT IN/OUT 9.4 PPG,NO LOSSES -ECD ACTUAL-10.4 PPG,CALCULATED CLEAN HOLE 10.0 PPG -PU-140K,SO-113K,ROT-119K -SURVEY EVERY 90'FOR MULTI-STATION CORRECTION SOFTSPEED ACTIVE FOR DRILLING INTERVAL -GAS WATCH:AVERAGE BACKGROUND=150 UNITS,MAXIMUM=151 UNITS -ACTUAL DRILLING TIME FOR DAY=12.7 HOURS(55%) PUMPED SWEEPS AS FOLLOWS: -5565'MD:35 BBL WEIGHTED 1.5 PPG OVER WITH 8 PPB WALL-NUT,NO INCREASE INCUTTINGS BACK AT SHAKERS Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 12 o*!t Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date ' From-To Hrs Task Code I NPT Total Depth Phase I Description of Operations (hr) (usft) 7/22/2017 T00:00 - 06:00 6.00 DRILL P 6,703.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 5872'MD TO 6703'MD IN UGNU1 FORMATION(831'IN 6 HRS=139 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=200 FPH(LIMIT PER WELL PROGRAM) -600 GPM,2800-3000 PSI ON BTM,140 RPM, 4-7/4-5 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB -MUD WEIGHT IN/OUT 9.4 PPG,NO LOSSES -CLEANHOLE ECD=10 PPG,ACTUAL= 110.4-10.5 PPG,11.7 PPG HARDLINE -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -SOFTSPEED ACTIVE FOR DRILLING INTERVAL -GAS WATCH:BACKGROUND=100 UNITS, MAXIMUM=193 UNITS 6095'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 25%INCREASE IN RETURNS AT SHAKERS 6575'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH NO INCREASE IN RETURNS AT SHAKERS 06:00 - 12:00 6.00 DRILL P 7,464.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE 1 SECTION FROM 6703'MD TO 7464'MD IN I UGNU1&WS2/1 FORMATIONS(761'IN 6 HRS =127 FPH WITH CONNECTIONS) 1-INSTANTANEOUS ROP=200 FPH(LIMIT PER WELL PROGRAM) -600 GPM,3000-3300 PSI ON BTM,140 RPM, 16-8/4-5 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB -MUD WEIGHT IN/OUT 9.4 PPG,NO LOSSES -CLEANHOLE ECD=10 PPG,ACTUAL= 10.4-10.6 PPG,11.7 PPG HARDLINE NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -SOFTSPEEDACTIVE FOR DRILLING INTERVAL -GAS WATCH:BACKGROUND=150 UNITS, MAXIMUM=233 UNITS -HIGHLINE POWER LOSS WHEN ON BOTTOM DRILLING AT 7050'MD. POWER RESTORED AND DRILLING RESUMED WITHIN 5 MIN. 7040'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH NO INCREASE IN RETURNS AT SHAKERS PLANNED WEIGHT UP: AT 7150'MD BLEED IN 290 BBLS 10.9 PPG SPIKE FLUID TO DILUTE MUD SYSTEM AND INCREASE MUD WEIGHT FROM 9.4 PPG TO 9.7 PPG OVER TWO CIRCULATIONS AHEAD OF CM3 AT 7786'MD. WEIGHT UP COMPLETED AT 7550'MD. RECORD SCRS. Printed 8/11/2017 10.12:37AM *All depths reported in Drillers Depths* North America-ALASKA-BP Page 130114 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay ! Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P 8,084.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 7464'MD TO 8084'MD IN WS1 AND CM3 FORMATIONS(620'IN 6 HRS=103 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=200 FPH(LIMIT PER WELL PROGRAM) -600 GPM,3700-3900 PSI ON BTM PRESSURE,140 RPM,6-8/4-5 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB MW IN/OUT=9.7 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.27 PPG,11.05 PPG ACTUAL,11.7 PPG HARDLINE -SOFTSPEEDACTIVE FOR DRILLING INTERVAL -GAS WATCH:BACKGROUND=150 UNITS, MAXIMUM=397 UNITS 17515'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 50%INCREASE IN RETURNS AT SHAKERS 7989'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 50%INCREASE IN RETURNS AT SHAKERS 18:00 - 00:00 6.00 DRILL P 8,637.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 8084'MD TO 8637'MD IN CM3 FORMATION(553'IN 6 HRS=92 FPH WITH CONNECTIONS) I-INSTANTANEOUS ROP=100-200 FPH '-600 GPM,4000 PSI ON BTM PRESSURE,140 RPM,6-7/4-5 KFT-LBS TRQ ON/OFF BTM,UP TO 22 KLBS WOB -MW IN/OUT=10.1 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND ECD CLEANHOLE=10.66 PPG,11.36 PPG ACTUAL,11.7 PPG HARDLINE -SOFTSPEED ACTIVE FOR DRILLING INTERVAL -GAS WATCH:BACKGROUND=300-400 UNITS,MAXIMUM=583 UNITS -ACTUAL DRILLING TIME FOR PAST 24 HOURS=17.6(73%) -DIRECTIONAL NOTES: SAILED AT 63°INC THROUGH DAY OF DRILLING. .49'LEFT AND 2.57'HIGH FROM THE PLAN. 8554'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 50%INCREASE IN RETURNS AT SHAKERS PLANNED WEIGHT UP: AT 8150'MD BLEED IN 290 BBLS 11.7 PPG SPIKE FLUID TO DILUTE MUD SYSTEM AND INCREASE MUD WEIGHT FROM 9.7 PPG TO 10.1 PPG OVER TWO CIRCULATIONS AHEAD OF CM2 AT 8713'MD. WEIGHT UP COMPLETED AT 8400'MD. RECORD SCRS. Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 14 e Operation Summary Report Common Well Name:C-34 1AFE No Event Type:RE-ENTER-ONSHORE(RON) C Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 I Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/23/2017 00:00 - 06:00 6.00 DRILL P 9,215.00 INTI j DIRECTIONAL DRILL 8-1/2"INT HOLE FROM 18637'MD TO 9232'MD IN CM3 AND CM2 FORMATIONS(595'IN 6 HRS=99 FPH WITH 1 CONNECTIONS). 1-INSTANTANEOUS ROP=100-175 FPH (LIMITING ROP FOR ECD MANAGEMENT) -600 GPM,4200-4300 PSI ON BTM PRESSURE,140 RPM,7-10/4-6 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB MW IN/OUT=10.1 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND ECD CLEANHOLE=10.67 PPG,11.55 PPG ACTUAL,11.7 PPG HARDLINE -GASWATCH BACKGROUND UNITS=400-500, 1MAX=710 SOFTSPEED ACTIVE FOR DRILLING INTERVAL 9030'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 50%INCREASE IN RETURNS AT SHAKERS 06:00 - 12:00 6.00 DRILL P 9,688.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE 1 SECTION FROM 9232'MD TO 9688'MD IN CM2 FORMATION(456'IN 6 HRS=76 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=100-125 FPH (LIMITING ROP FOR ECD MANAGEMENT) 580-600 GPM,4300 PSI ON BTM PRESSURE, 140 RPM,6-8/4-6 KFT-LBS TRQ ON/OFF BTM, UP TO 20 KLBS WOB MW IN/OUT=10.1 PPG,NO LOSSES '-NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.67 PPG,11.63 PPG ACTUAL,11.7 PPG HARDLINE -GAS WATCH:BACKGROUND=100 UNITS, MAXIMUM=318 UNITS -SOFTSPEED ACTIVE FOR DRILLING 'INTERVAL 9415'MD-35 BBL 1.5 PPG OVER WEIGHTED SWEEP WITH 125%INCREASE IN RETURNS AT SHAKERS Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 15 OKI Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) INTI DIRECTIONAL DRILL 8-1/2"INT HOLE 12:00 18:00 6.00 DRILL I P 10,064.00 SECTION FROM 9688'MD TO 10064'MD IN CM2 AND CMI FORMATIONS(376'IN 6 HRS= 63 FPH WITH CONNECTIONS) INSTANTANEOUS ROP=100-125 FPH (LIMITING ROP FOR ECD MANAGEMENT) -575 GPM,4450 PSI ON BTM PRESSURE,140 RPM,6-8/4-6 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB ' 1 '-MW IN/OUT=10.1 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, !SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.67 PPG,11.6 PPG ACTUAL,11.7 PPG HARDLINE -GAS WATCH:BACKGROUND=100 UNITS, I MAXIMUM=250 UNITS SOFTSPEED ACTIVE FOR DRILLING i INTERVAL 19790'MD-35 BBL HIGH VIS SWEEP WITH 50% !INCREASE IN RETURNS AT SHAKERS '9980'MD-35 BBL HIGH VIS SWEEP WITH 75% INCREASE IN RETURNS AT SHAKERS 18:00 - 00:00 6.00 DRILL N 10,064.00 INTI SHORT TRIP FOR ECD MANAGEMENT FROM I I BOTTOM AT 10064'MD TO 8083'MD TO GET DL REAMER TO 9-5/8"CASING WINDOW -BACKREAM AT 525-575 GPM,3450-4450 PSI, 140 RPM,5-8 KFT-LBS TRQ,250-900 FPM -ADJUST PARAMETERS AS NEEDED TO CONTROL ECD -OBSERVED SIGNIFICANT VOLUME OF I CUTTINGS COMING OVER SHAKERS THROUGHOUT SHORT TRIP i-MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) 7/24/2017 00:00 - 02:00 2.00 DRILL N 10,064.00 INTI I SHORT TRIP FOR ECD MANAGEMENT FROM 8083'MD AT MIDNIGHT TO 7717'MD TO GET DL REAMER TO WITHIN 10'OF 9-5/8"CASING WINDOW -BACKREAM AT 525-575 GPM,3450-4450 PSI, 140 RPM,5-8 KFT-LBS TRQ,250-900 FPM -ADJUST PARAMETERS AS NEEDED TO CONTROL ECD -OBSERVED SIGNIFICANT VOLUME OF CUTTINGS COMMING OVER SHAKERS THROUGHOUT SHORT TRIP -MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) 02:00 - 03:00 1.00 DRILL N 10,064.00 INTI ;TRIP IN THE HOLE ON ELEVATORS FROM '7717'MD TO BOTTOM AT 10064'MD -MONITOR WELL FOR 10 MIN PRIOR TO TRIPPING IN THE HOLE(STATIC) i l -NO ISSUES WHILE TRIPPING IN THE HOLE PUMP PRESSURE AND ECD PRIOR OR TO SHOR TRIP=4450 PSI,11.58 ECD -PUMP PRESSURE AND ECD AFTER SHORT I !TRIP=4350 PSI,11.1 ECD Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 16 atH;`i Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Ri ,Name/No.:PARKER 272 Site: D Pad Project:Prudhoe Bay Rig ' Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT Total Depth I Phase Description of Operations (hr) (usft) 03:00 06:00 3.00 DRILL P 10,250.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 10064'MD TO 10250'MD IN CM1 FORMATION(186'IN 3 HRS=62 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=75-100 FPH (LIMITING ROP FOR ECD MANAGEMENT) -575 GPM,4350 PSI ON BTM PRESSURE,140 'RPM,6-8/4-6 KFT-LBS TRQ ON/OFF BTM,UP TO 20 KLBS WOB -MW IN/OUT=10.1 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.66 PPG,11.3 PPG ACTUAL,11.7 PPG HARDLINE -GAS WATCH:BACKGROUND=210 UNITS, MAXIMUM=1045 UNITS AT BOTTOMS UP FROM SHORT TRIP -SOFTSPEED ACTIVE FOR DRILLING INTERVAL BLEND IN 480 BBL 11.2PPG SPIKE FLUID WITH BLACK PRODUCT TO INCREASE MUD WEIGHT TO 10.4 PPG. 06:00 - 12:00 6.00 DRILL P 10,667.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 10250'MD TO 10667'MD IN CM1 AND HRZ FORMATIONS(417'IN 6 HRS= 70 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=75-100 FPH (LIMITING ROP FOR ECD MANAGEMENT) -575 GPM,4350 PSI ON BTM PRESSURE,140 RPM,7-8/6-7 KFT-LBS TRQ ON/OFF BTM,UP TO 15 KLBS WOB -MW IN/OUT=10.4 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND ECD CLEANHOLE=10.95 PPG,11.6 PPG ;ACTUAL,11.7 PPG HARDLINE GAS WATCH:BACKGROUND=250 UNITS, MAXIMUM=646 UNITS -SOFTSPEED ACTIVE FOR DRILLING INTERVAL 12:00 - 18:00 6.00 DRILL P 11,097.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 10667'MD TO 11097'MD IN HRZ AND KNG FORMATIONS(430'IN 6 HRS= 71 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=75-100 FPH (LIMITING ROP FOR ECD MANAGEMENT) -550 GPM,4550 PSI ON BTM PRESSURE,140 RPM,8-9/6-8 KFT-LBS TRQ ON/OFF BTM,UP TO 15 KLBS WOB -MW IN/OUT=10.4 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.95 PPG,11.6-11.7 PPG ACTUAL,11.7 PPG HARDLINE -GAS WATCH:BACKGROUND=200 UNITS, MAXIMUM=563 UNITS SOFTSPEED ACTIVE FOR DRILLING INTERVAL 10730'MD-35 BBL HIGH VIS SWEEP WITH 25%INCREASE IN RETURNS AT SHAKERS Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 17 0(1 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad -— Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P 11,460.00 1 INT1 DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 11097'MD TO 11460'MD IN HRZAND KNG FORMATIONS(363'IN 6 HRS= 161 FPH WITH CONNECTIONS) I-INSTANTANEOUS ROP=75-100 FPH (LIMITING ROP FOR ECD MANAGEMENT) -525 GPM,4300 PSI ON BTM PRESSURE,140 RPM,8-10/7-9 KFT-LBS TRQ ON/OFF BTM,UP TO 15 KLBS WOB 1-MW IN/OUT=10.4 PPG,NO LOSSES -NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.95 PPG,11.6-11.7 PPG ACTUAL,11.7 PPG HARDLINE 1-GAS WATCH:BACKGROUND=150 UNITS, 'MAXIMUM=315 UNITS SOFTSPEED ACTIVE FOR DRILLING INTERVAL 111202'MD-35 BBL HIGH VIS SWEEP WITH 150%INCREASE IN RETURNS AT SHAKERS 7/25/2017 00:00 - 06:00 6.00 DRILL P 11,800.00 INTI DIRECTIONAL DRILL 8-1/2"INT HOLE SECTION FROM 11460'MD TO 11800'MD IN SGR FORMATION(340'IN 6 HRS=57 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=75-100 FPH I(LIMITING ROP FOR ECD MANAGEMENT) -525 GPM,4350 PSI ON BTM PRESSURE,140 RPM,9-11/8-10 KFT-LBS TRQ ON/OFF BTM,UP 1 TO 15 KLBS WOB MW IN/OUT=10.4 PPG,NO LOSSES NO BACKREAMING AT CONNECTIONS, SURVEY EVERY 95'STAND -ECD CLEANHOLE=10.95 PPG,11.6-11.7 PPG ACTUAL,11.7 PPG HARDLINE -GAS WATCH:BACKGROUND=150 UNITS, MAXIMUM=192 UNITS SOFTSPEED ACTIVE FOR DRILLING INTERVAL PUMP 35 BBL HIGH VIS SWEEP AT 11486'MD WITH 50%INCREASE IN RETURNS AT SHAKERS 8-1/2"INTERMEDIATE INTERVAL SAG CASING PICK: -DRILLED TO THE TOP OF THE TJB.BEGIN CONTROL DRILLING AT THIS POINT, WATCH FORA REVERSE DRILLING BREAKAT THE TOP OF THE SAG RIVER FORMATION -OBSERVE REVERSE DRILLING BREAKAT 11,796' -AT 11,800'(4-1/2'INTO THE SAG RIVER FORAMTION)OBSERVE PUMP PRESSURE 'DECREASE BY 300 PSI,FLOW OUT DECREASE,WITH AN INITIAL LOSS RATE OF ,600 BPH Printed 8/11/2017 10:12:37AM *Ail depths reported in Drillers Depths* 110 North America-ALASKA-BP • Page 48 0*T Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: ,X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL N 11,800.00 INTI ATTEMPT TO HEAL LOSSES ON BOTTOM !WITH LCM TREATMENTS,AND VARYING FLOW RATES -PUMP 2 X 4OBBL/4OPPB DRILL AHEAD LCM PILLS -OBSERVE LOSS RATE DECREASE TO 30 !BPH AT 250 GPM -PUMP 1 X 80 BBL/40 PPB DRILLAHEAD LCM PILL -STAGE UP FLOW RATE FROM 250 GPM TO 400 GPM,OBSERVING LOSS RATE DECREASE TO 50 GPM SHUT DOWN PUMPS TO RACK BACK A I SINGLE,AND OBSERVE HIGHER/LONGER I THAN EXPECTED FLOW BACK AT THE CONNECTION. -CONTACT ANCHORAGE TEAM TO DEVELOP PLAN FORWARD TO MONITOR FOR POTENTIAL WELLBORE BREATHING. -TOTAL FLUID LOSSES TO THIS POINT=600 IBBLS 12:00 - 13:30 1.50 DRILL N 11,800.00 INTI CONDITION MUD,PERFORM EXTENDED FLOW CHECK TO MONITOR FOR WELLBORE 1 BREATHING,SPOT 10 BBL/40 PPB DRILL AHEAD LCM PILL IN THE HOLE -CIRCULATE AT 400 GPM,2475 PSI -ROTATE AT 140 RPM AND 8 KFT-LBS TORQUE -OBSERVE 0-30 BPH LOSSES ON BOTTOM -MONITOR WELL,PERFORMING EXTENDED FLOW CHECK AND OBSERVE STATIC WELL CONDITIONS FOR 15 MINUTES BEGIN TO PUMP AND PULL OUT OF THE HOLE,SPOT 1 OBBL LCM PILL IN ANNULUS 13:30 - 15:00 1.50 DRILL P 11,800.00 INT1 PUMP AND PULL OUT OF THE HOLE TO THE TOP OF THE SHALES AT 10,400'MD -PUMP AT 2 BPM,300 PSI -PULL OUT OF THE HOLE AT 50 FT/MIN -PU=225 KLBS,SO=135 KLBS -OBSERVE SLIGHT PRESSURE SPIKES 400- 600 PSI ON THE LAST TWO STANDS COMING OUT OF THE HOLE -LAST STAND AT 10,500'MD PULLED 40 KLBS OVER,ATTEMPTED TO WORK THROUGH WITHOUT ROTATION WITH NO SUCCESS INITIATED BACKREAMING AT 60 RPM,8.5 KFT-LBS TORQUE 15:00 - 15:30 0.50 DRILL P 11,800.00 INTI PUMP 35 BBL,40 PPB DRILLAHEAD LCM PILL AT THE TOP OF THE SHALES PER OCN#2 -PUMP PILL DOWN AT 400 GPM,SLOW TO 300 GPM,1450 PSI FOR PILL LEAVING THE BIT 15:30 - 21:00 5.50 DRILL P 11,800.00 INTI BACKREAM OUT OF THE HOLE FROM 10400' MD TO 7700'MD PER OCN#2 BACKREAMING AT FULL RATE OF 500 GPM WITH 3500 PSI -140 RPM,8 KFT-LBS TORQUE -LOSS RATE=0 BPH -VARYING PULLING SPEED TO ACCOMODATE ECD FROM 500-1000 FT/HR Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 19 o141 Operation Summary Report Common Well Name:C-34 'AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad I Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 DRILL N 11,800.00 INTI ENCOUNTER TIGHT HOLE AT 9410'MD WITH INTERMITTENT PACKOFFS,ECD AND TORQUE SPIKES.OBSERVE 30 BBLS FLOW I BACK AT CONNECTION,INDICATIVE OF WELLBORE BREATHING.SHUT IN WELL AND PERFORM EXHALE TEST PER BP RP: WELLBORE BREATHING. -AT 9360'MD,OBSERVE INCREASING ECD'S. ECD AT BEGINNING OF STAND=11.36 PPG, 1 ECD SPIKE AT 9360'MD TO 12.02 PPG.LOST 1 65 BBLS PRIOR TO I -LOWER FLOW RATE TO 400 GPM,AND 1 OBSERVE ECD DECREASE TO 11.3 PPG -CONTINUE TO BACKREAM THE STAND AT 400 GPM,LOST 65 BBLS WHILE I BACKREAMING THIS STAND -SHUT DOWN PUMPS AFTER STAND DOWN AND OBSERVE 30 BBLS FLOW BACK ' I-SHUT IN WELLBORE AT 21:30 HRS AND CONTACT WSUP TO DEVELOP PLAN 'FORWARD EXHALE TEST: DISCUSS SITUATION WITH WSUP AND WOM 'AND AGREE TO BLEED IN 1 BBL INCREMENTS PER BP RP:WELLBORE BREATHING BEGIN TO DOCUMENT PRESSURE AND CONDITIONS FOR EXHALE TEST I-INITIAL CONDITIONS AFTER SHUTTING IN THE WELL:SIDPP=330 PSI,SICP=270 PSI BLEED#1:BLEED 1 BBL IN(2:36)THROUGH THE CHOKE AND MUD GAS SEPARATOR TO , THE TRIP TANK -5 MINUTES:SIDPP=270 PSI,SICP=220 PSI -10 MINUTES:SIDPP=278 PSI,SICP=240 PSI BLEED#2:BLEED 1 BBL IN(3:10)THROUGH CHOKE AND MUD GAS SEPARATOR TO THE TRIP TANK -INITIAL:SIDPP=200 PSI,SICP=130 PSI -5 MINUTES:SIDPP=239 PSI,SICP=200 PSI -10 MINUTES:SIDPP=245 PSI,SICP=200 PSI i-70 PSI INCREASE BLEED#3:BLEED 1 BBL IN(2:52)THROUGH II CHOKE AND MUD GAS SEPARATOR TO THE TRIP TANK !-INITIAL:SIDPP=180 PSI,SICP=110PSI !-5 MINUTES:SIDPP=205 PSI,SICP=160 PSI I-10 MINUTES: SIDPP=213 PSI,SICP=180 I PSI -70 PSI INCREASE BLEED#4:BLEED 1 BBL THROUGH CHOKE AND MUD GAS SEPARATOR TO THE TRIP I TANK INITIAL:SIDPP=140 PSI,SICP=70 PSI ' I-5 MINUTES:SIDPP=160 PSI,SICP=120 PSI ' -10 MINUTES:SIDPP=180 PSI,SICP=140 Printed 8/11/2017 10:12:37AM 'All depths reported in Drillers Depths* • North America-ALASKA-BP Page 2001.4 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: 1X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) PSI] -70 PSI INCREASE BLEED#5:BLEED 2 BBLS THROUGH CHOKE AND MUD GAS SEPARATOR TO THE TRIP TANK -INITIAL:SIDPP=104 PSI,SICP=20 PSI 5 MINUTES:SIDPP=120 PSI,SICP=80 PSI -10 MINUTES:SIDPP=132 PSI,SICP=100 PSI -40 PSI INCREASE BLEED#6:BLEED 2 BBLS THROUGH CHOKE AND MUD GAS SEPARATOR TO THE TRIP TANK -INITIAL:SIDPP=80 PSI,SICP=10 PSI -5 MINUTES:SIDPP=80 PSI,SICP=20 PSI EXHALE TEST OPERATIONS CONTINUED ON 07/26/2017 7/26/2017 00:00 - 01:00 1.00 DRILL N 11,800.00 INTI CONTINUED FROM 7/25/2017,PERFORMING EXHALE TEST TO DIAGNOSE WELLBORE BREATHING: OPEN CHOKE TO 100%TO ESTABLISH DIMINISHING FLOW RATE @ 3 MIN,35 SEC:1 BBL @ 6 MIN,15 SEC:2 BBLS @ 15 MINUTES:3 BBLS -ESTABLISH FLOW RATE OF 1-1/4 BPH WITH I WELL OPEN THROUGH THE CHOKE FOR A I TOTAL OF 1 HOUR -DISCUSS RESULTS WITH FULLY OPEN CHOKE,AND RECEIVE AUTHORIZATION TO PROCEED WITH OPENING THE ANNULAR PREVENTER AT 01:00 HRS -OPEN ANNULAR PREVENTER,PICK UP STRING TO VERIFY PIPE IS FREE 01:00 - 03:00 2.00 DRILL P 11,800.00 INTI STAGE UP PUMPS SLOWLY IN 1 BBL INCREMENTS,ALLOWING PRESSURE TO STABILIZE BEFORE PROCEEDING TO NEXT FLOW INCREMENT -400 GPM,2200 PSI AT BOTTOMS UP AFTER 30 BBL BREATHE-BACK AT CONNECTION PRIOR TO 'SHUTTING IN,GAS WATCH VALUES=200 UNITS -LOSS RATE=40 BPH -INCREASE FLOW RATE TO 500 GPM AND OBSERVE LOSS RATE INCREASE TO-100 BPH AND ECD'S INCREASE TO 11.5 PPG EMW -DECREASE FLOW RATE TO 400 GPM,AND I RESUME BACKREAMING STRATEGY PER OCN#2 Printed 8/11/2017 10.12:37AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 21 OA Operation Summary Report Common Well Name:C-34 I AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:7/15/2017 End Date: X3 018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 I Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To I Hrs Task Code I NPT Total Depth Phase I Description of Operations (hr) (usft) 03:00 - 12:00 9.00 DRILL P 11,800.00 INTI BACKREAM OUT OF THE HOLE FROM 9280' MD TO 8400'MD -475-500 GPM,3000-3200 PSI -120 RPM,7-12 KFT-LBS TORQUE -VARYING PULLING SPEED TO ACCOMMODATE HIGH ECD'S AND PACKOFFS -FINGERPRINTING AT EACH CONNECTION PER RP:WELLBORE BREATHING -OBSERVING ECD'S FROM 11.2-11.8 PPG EMW 12:00 - 00:00 12.00 DRILL P 11,800.00 INTI BACKREAM OUT OF THE HOLE FROM 8400' MD TO 7799'MD -500-525 GPM,3000-3200 PSI -120 RPM,7-12 KFT-LBS TORQUE,126K ROT WT -VARYING PULLING SPEED TO ACCOMMODATE HIGH ECD'S AND PACKOFFS FINGERPRINTING AT EACH CONNECTION PER RP:WELLBORE BREATHING -OBSERVING ECD'S FROM 11.2-11.7 PPG EMW -PUMP 25 BBL WEIGHTED SWEEP AT 8085' WITH 75%INCREASE IN CUTTINGS AT BOTTOMS UP -MINIMAL TO NO LOSSES WHILE BACKREAMING -AVERAGE BACKGROUND GAS=47 UNITS, MAX GAS 193 UNITS 7/27/2017 00:00 - 01:30 1.50 DRILL P 11,800.00 INTI BACKREAM OUT OF THE HOLE FROM 7799' MD TO 7726'MD,BRINGING THE DOG LEG REAMER TO JUST BELOW THE WINDOW -525 GPM,3000-3200 PSI -120 RPM,7-12 KFT-LBS TORQUE,126K ROT WT -VARYING FLOW RATE AND PULLING SPEED TO ACCOMODATE HIGH ECD'S AND PACKOFFS -FINGERPRINTING AT EACH CONNECTION PER RP:WELLBORE BREATHING -OBSERVE ECD'S FROM 11.2-11.8 PPG EMW -PULLING SPEED DECREASED AT THE TOP OF THE SHORT TRIP -PUMPED 35 BBL HIGH VIS SWEEP WITH NO NOTABLE INCREASE IN CUTTINGS AT BOTTOMS UP WITH THE SWEEP OUT OF THE HOLE, SHUT DOWN ROTARY AND ATTEMPT TO PULL DOG LEG REAMER THROUGH THE WINDOW -PUMP AND PULL AT 525 GPM,OBSERVE IMMEDIATE OVER PULL OF 30 KLBS Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* 411 North America-ALASKA-BP • Page 22l Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay 1 Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date 1 From-To Hrs 1 Task Code NPT Total Depth 1 Phase ! Description of Operations (hr) (usft) 01:30 - 02:30 1.00 DRILL P 11,800.00 INTI SHUT DOWN PUMPS AND ROTARY AND ATTEMPT TO PULL 5 STANDS ON ELEVATORS TO EVALUATE WELLBORE CONDITIONS ABOVE DOG LEG REAMER TD -ORIGINAL PU=160K,SO=120K WHILE DRILLING INTERVAL -PULL 30'ON ELEVATORS FROM 7726'MD- 7696'MD AND OBSERVE 30-40 KLBS OVERPULL -WIPE BACK DOWN,OBSERVE 20K DRAG 1-REPEAT THIS PROCESS IN 30'INCREMENTS MOVING UP THE HOLE.OBSERVE 30-40 KLBS OVERPULLAT EACH ITERATION AT THE PREVIOUS STOP POINT.INDICATIONS THAT OVERPULL IS MOVING CUTTINGS UP THE HOLE. SLOWLY STAGE UP PUMPS IN 1 BBL 'INCREMENT,ALLOWING PRESSURE TO STABALIZE AT EACH FLOW RATE INTERVAL TO 500 GPM,2470 PSI 02:30 - 07:00 4.50 DRILL P 11,800.00 INTI PERFORM WIPER TRIP-BACKREAM OUT OF THE HOLE FROM 7696'MD TO 6700'MD -525-550 GPM,3000-3025 PSI 120 RPM,5-7 KFT-LBS TORQUE,126K ROT WT -MONITOR FLOW RATE AND PULLING I SPEEDS CLOSELY TO PREVENT HIGH ECD'S AND PACKOFFS -FINGERPRINTING AT EACH CONNECTION PER RP:WELLBORE BREATHING -OBSERVING ECD'S FROM 11..0-11.33 PPG EMW -PULLING SPEEDS INCREASED VARIED FROM 250-550 FPH NO LOSSES 07:00 - 08:30 1.50 DRILL P 11,800.00 INTI POOH ON ELEVATORS FROM 6700'MD TO 4100'MD MONITOR WELL 10 MIN-WELL STATIC -PU-124K,SOW-108K AT 4200'MD -BREAK AND LAYDOWN NOV DOG LEG ;REAMER 08:30 - 12:30 4.00 DRILL P 11,800.00 INTI COMPLETE PLANNED WIPER TRIP,RIH WITH 8-1/2"RSS DRILLING BHA ON ELEVATORS FROM TOP OF WIPER TRIP 4100'MD TO 10436' -PU-172K,SO-120K,AT 9200'MD -RIH ON ELEVATORS,FILL PIPE EVERY 2000', -MONITOR WELL ON TRIP TANK-CORRECT DISPLACEMENT -MW-10.4,IN/OUT -NO LOSSES OBSERVED 12:30 - 13:30 1.00 DRILL P 11,800.00 INTI CIRCULATE 100 BBLS TO CLEAR OPEN HOLE ANNULUS VOUME -STAGE PUMPS UP TO 400 GPM,2550 PSI -RECIPROCATE ONE STAND WHILE PUMPING. -ZERO LOSSES. -10.4 PPG MUD IN/OUT Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 23 az* Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 11 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task NPT Total Depth Phase Description of Operations Code (hr) (usft) 13:30 - 15:00 1.50 DRILL P 11,800.00T INTI COMPLETE WIPER TRIP,RIH WITH 8-1/2"RSS DRILLING BHA ON ELEVATORS FROM 10436' I TO HOLE SECTION TD AT 11800'MD -WASH LAST STAND TO BOTTOM. -OBSTRUCTION/BRIDGE AT 11702'MD,SET DOWN 30K,WORK PIPE WHILE VARYING PUMP AND ROTARY TO WORK PAST WELL SHOWING SIGNS OF PACKING OFF -ABLE TO WORK PAST OBSTRUCTION AND WASH DOWN TO BOTTOM WITH 2 BPM,275 PSI 15:00 - 22:30 7.50 DRILL P 11,800.00 INTI CIRCULATE HOLE CLEAN WITH 5 TOTAL BOTTOMS UP UNTIL SHAKERS ARE CLEAN -STAGE UP PUMPS OVER 1.25 HOURS IN 1 BPM INCREMENTS -550 GPM,4050 PSI ICP,3960 PSI FCP,120 RPM,10 KFT-LBS,RECIPROCATING 1 STAND AT 800 FPH -INITIAL ECD=11.3 PPG,FINAL=11.1 PPG EMW I-MW IN/OUT=10.4 PPG,NO LOSSES -OBSERVE 150 UNITS OF GAS ON FIRST BOTTOMS UP.RETURN TO 87 UNITS I BACKGROUND AFTER SPIKE -PUMP 580 BBL MUD DILUTION PUMP(1)40 BBL HI-VIS SWEEP WITH 25% RETURNS INCREASE -FLOWCHECK WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) -TAKE SPR'S 22:30 - 23:00 0.50 DRILL P 11,800.00 INTI RIG SERVICE -GREASE TOP DRIVE,BLOCKS&WASH PIPE 23:00 - 00:00 1.00 DRILL P 11,800.00 INTI PULL OUT OF THE HOLE WITH 8-1/2" INT RSS DRILLING ASSEMBLY FROM HOLE SECTION TD AT 11800'MD TO 10814'MD -PUMP OUT THROUGH KINGAK AND HRZ SHALES(11796'-10479'MD);70 FPM,2 BPM, 275 PSI-PER WELL PROGRAM TRIP SPEEDS -INITIAL PUW OFF BOTTOM-260K, SOW-140K -PUMP AND PULL OUT AT 2 BPM W/275 PSI, 240K PUW 7/28/2017 00:00 - 00:30 0.50 DRILL P 11,800 00 INTI PUMP OUT OF THE HOLE WITH 8-1/2" INT RSS DRILLING ASSEMBLY FROM HOLE SECTION TD AT 10814'MD TO THE TOP OF THE SHALES AT 10425'MD 1-2 BPM,250 PSI !-PULLING SPEED PER TRIPPING LIMITS IN THE WELL PROGRAM -MONITOR HOLE FILL ON TRIP TANK CORRECT DISPLACEMENT,NO LOSSES OBSERVED -NO ISSUES IN OPEN HOLE -PU=195 KLBS,SO=125 KLBS AT 10400'MD Printed 8/11/2017 10:12:37AM *AI depths reported in Drillers Depths* IP III North America-ALASKA-BP Page 24 gee Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: 'X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date 1 From-To Hrs Task Code I NPT Total Depth Phase Description of Operations (hr) (usft) 00:30 - 01:30 1.00 DRILL P ! 11,800.00 INTI CIRCULATE BOTTOMS UP AT THE TOP OF I THE SHALES -STAGE UP PUMPS IN 1 BBL INCREMENTS -550 GPM,3650 PSI -120 RPM,8 KFT-LBS TORQUE -PUMP HIGH VIS SWEEP,OBSERVE NO I SIGNIFICANT INCREASE IN CUTTINGS OVER THE SHAKERS -AT FIRST ATTEMPT TO STAGE UP PUMPS OBSERVE 200 PSI PACKOFF -INITIAL ECD=11.29 PPG EMW,FINAL ECD= t 11.15 PPG EMW 01:30 - 04:30 3.00 DRILL P 11,800.00 INTI PULL OUT OF THE HOLE ON ELEVATORS WITH 8-1/2"INT RSS DRILLING ASSEMBLY FROM THE TOP OF THE SHALES AT 10425'MD TO THE TOP OF THE WINDOW AT 3582'MD -PULLING SPEEDS PER TRIPIPNG LIMITS IN THE WELL PROGRAM MONITOR HOLE FILL ON TRIP TANK: CORRECT DISPLACEMENT,NO LOSSES OBSERVED -NO ISSUES IN OPEN HOLE 1-PU=120 KLBS,SO=115 KLBS AT 3780'MD j-PERFORM 10 MINUTE FLOW CHECKAT THE WINDOW:STATIC 04:30 - 05:30 1.00 DRILL P 11,800.00 I INTI CIRCULATE BOTTOMS UP AT THE WINDOW I(3582'MD) -550 GPM,2000 PSI ' -120 RPM,1 KFT-LB TORQUE ECD=11.2 PPG EMW 05:30 - 07:00 1.50 DRILL P 11,800.00 INTI PULL OUT OF THE HOLE ON ELEVATORS WITH 8-1/2"INT RSS DRILLING ASSEMBLY FROM THE TOP OF THE WINDOW AT 3582'MD TO 900'MD -PERFORM 10 MINUTE FLOW CHECK BEFORE PULLING BHA THROUGH THE STACK:STATIC -PU=115 KLBS,SO=110 KLBS AT 3400'MD 07:00 - 08:00 1.00 DRILL P 11,800.00 INTI LAY DOWN 8-1/2" INT RSS DRILLING ASSEMBLY FROM 900'MD TO SURFACE PER BAKER DD AND MWD BIT GRADE:1-1-CT-A-X-I-NO-TD 08:00 - 08:30 0.50 DRILL P 11,800.00 INTI I MAKE UP 7"TEST JOINT -PULL WEAR RING I-SET TEST PLUG AND RUN IN LOCK DOWN SCREWS 08:30 - 10:00 1.50 BOPSUR P 11,800.00 ! INTI CHANGE OUT UPPER RAMS FROM 2-7/8"X 5" 'VBRS TO 7"FIXED CASING RAMS -PRESSURE TEST 7"CASING RAMS TO 250 I PSI LOW/3500 PSI HIGH FOR 5 MINUTES 'EACH -BACK OUT LOCK DOWN SCREWS AND LAY DOWN TEST JOINT 10:00 - 11:00 1.00 CASING P 11,800.00 INTI RIG UP TO RUN 7"CASING -RIG UP DOYON CASING TONGS AND TORQUE TURN EQUIPMENT 11:00 - 13:00 2.00 CASING P 11 11,800.00 INTI INSPECT AND CHANGE OUT SAVER SUB Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 25 crri Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: tX3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) j 13:00 - 14:00 1.00 CASING P 11,800.00 INTI CONTINUE RIGGING UP TO RUN 7"CASING RIG UP FILL UP HOSE -MAKE UP FOSV TO 7"VTHC CROSSOVER -RIG UP 7"ELEVATORS -MAKE UP COLLARS ON 6'PUP JOINTS WITH BAKER LOCK AND LAY DOWN IN PIPE SHED 14:00 - 20:00 6.00 CASING P 11,800.00 INTI RUN 7",26#,L-80,VTHC CASING FROM SURFACE TO 3526'MD -FLOW CHECK WELL PRIOR TO RUNNING IN THE HOLE(STATIC) -MAKE UP SHOE TRACK(BAKERLOK CONNECTIONS)AND CHECK FLOATS(GOOD) -USE JET LUBE SEAL GUARD PIPE DOPE TORQUE TURN CONNECTIONS TO 11,950 FT-LBS -RUN 31 7-1/8"X 8-1/4"FREE FLOATING CENTRALIZERS ON JOINTS 1-31 RUN IN HOLE AT 70 FT/MINUTES FROM SURFACE MD TO 3526'MD -FILL CASING EVERY 10 JOINTS -VAM AND TUBULAR SOLUTIONS ALASKA REPRESENTATIVES VERIFY TORQUE-TURN GRAPHS AND INSPECT CONNECTIONS IF NECESSARY,ALL CONNECTIONS GOOD -RECORD PU/SO WEIGHTS EVERY 400 FT I-PU=120 KLBS,SO=110 KLBS -MUD WEIGHT=10.4 PPG IN/OUT 20:00 - 20:30 0.50 CASING P 11,800.06 INTI RIG UP VOLANT TOOLAND BAIL EXTENSIONS -FLOW CHECK WELL FOR 10 MINUTES: STATIC UNANNOUNCED D1 DRILL:CREW REACTION TIME=1.5 MINUTES 20:30 - 21:30 1.00 CASING P 11,800.00 INTI CIRCULATE BOTTOMS UP AT THE WINDOW (3526'MD) -425 GPM,450 PSI 21:30 - 23:30 2.00 CASING P 11,800.00 INTI ;RUN 7",26#,L-80,VTHC CASING FROM 3526' MD TO 4720'MD USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 11,950 FT-LBS -RUN IN HOLE AT 70 FT/MIN FROM 3526'TO 4966'MD -FILL CASING EVERY 10 JOINTS,CIRCULATE AT 5 BPM FOR 5 MINUTES OBTAIN PU/SO WEIGHTS EVERY 400 FT -PU=147,SO=125 KLBS AT 4700'MD -MUD WEIGHT=10.4 PPG IN/OUT 23:30 - 00:00 0.50 CASING P 11,800.00 i INTI SERVICE TOP DRIVE,GREASE WASH PIPE, BLOCK AND RIG FLOOR EQUIPMENT Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 26 OEN • Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. ,BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/29/2017 00:00 - 06:00 6.00 CASING P 11,800.00 INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 4720'MD TO 7800'MD WITH THE VOLANT TOOL USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 11,950 FT-LBS -RUN IN HOLE AT 70 FT/MIN FROM 3526'TO 14966'MD -FILL CASING EVERY 10 JOINTS,CIRCULATE AT 5 BPM FOR 5 MINUTES OBTAIN PU/SO WEIGHTS EVERY 400 FT -PU=200 KLBS,SO=135 KLBS AT 7800'MD -MINIMAL LOSSES WHILE RIH -MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT MUD WEIGHT=10.4 PPG IN/OUT 06:00 - 12:00 6.00 CASING P 11,800.00 INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 7800'MD TO THE TOP OF THE HRZ SHALE AT 10,406'MD WITH THE VOLANT [TOOL -RUNNING THROUGH THE CM1 TO THE TOP OF HRZ USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 11,950 FT-LBS FILL CASING EVERY 10 JOINTS,CIRCULATE AT 5 BPM FOR 5 MINUTES -OBTAIN PU/SO WEIGHTS EVERY 400 FT -OBSERVE CASING BECOMING STICKY(30 KLBS TO BREAK OVER),CIRCULATE DOWN 3 JOINTS FROM 9890-10,000'MD AT 5 BPM, 650PSI -CIRCULATE DOWN LAST 5 JOINTS AT 5 BPM, 650 PSI -PU=312 KLBS,SO=1120 KLBS AT 10400' MD -MINIMAL LOSSES WHILE RIH -MONITOR DISPLACEMENT WITH TRIP TANK: GOOD DISPLACEMENT I-MUD WEIGHT=10.4 PPG IN/OUT Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 27 OM- Wscr titt Operation Summary Report Y , Common Well Name:C-34 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI.USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 13:00 1.00 CASING P 11,800.00 INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM THE TOP OF THE HRZ AT 10,479'MD TO 10,713'MD WITH THE VOLANT TOOL -ATTEMPT TO RUN IN THE HOLE ON ELEVATORS TO 10713'MD THROUGH SHALES,BEGIN TO OBSERVE HIGH PICK UP WEIGHTS ENCOUNTER OBSTRUCTION IN THE HOLE 1 AT 10,700'MD,BREAK CIRCULATION AND OBSERVE INTERMITTENT PACKOFFS AND INCREASING BREAK OVER WEIGHTS -ORIGINAL PU WEIGHT=250 KLBS,SO=130 KLBS -CURRENT BREAK OVER WEIGHTS:PU=310 KLBS,SO=90 KLBS -ATTEMPT TO STAGE UP PUMPS TO WASH 'DOWN JOINT AND OBSERVE IMMEDIATE PACKOFF(700 PSI) SETAMPHION PUMP LIMIT TO 800 PSI TO AVOID SURGING THE FORMATION AND INDUCING LOSSES -KEEP PIPE MOVING AT BREAK OVER WEIGHTS AND CONTINUE ATTEMPTING TO MAINTAIN CONSTANT CIRCULATION -UNABLE TO STAGE UP PUMPS PAST 2 BPM WITHOUT PACKING OFF -OBSERVE BREAK OVER WEIGHTS INCREASE UNTIL UNABLE TO BREAK OVER, PIPE STUCK AT 10,713'MD Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 28 aimft Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) _i Project:Prudhoe Bay I Site:PB C Pad Rig Name/No.:PARKER 272 1 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT Total Depth 1 Phase Description of Operations T (hr) (usft) 13:00 - 22:30 9.50 CASING 1 N 11,800.00 INTI WORKING STUCK PIPE AT 10,713'MD -CONTINUE TO WORK PIPE WITH PU=310 KLBS,SO=90 KLBS,NOT OBSERVING ANY ! PROGRESS ON FREEING PIPE -VTHC MU TORQUE=11,950 FT-LBS,VAM !REPRESENTATIVE CONFIRMS 10 KFT-LBS TORQUE WITHIN OPERATING LIMITS OF ' CONNECTION AND PIPE BODY ATTEMPT TO WORK 10 KFT-LBS OF TORQUE DOWN TO STUCK POINT FOR"TORQUE AND SLUMP"METHOD OF FREEING PIPE. OBSERVE STRING TORQUE UP TO 10 KLBS 1 ' TORQUE QUICKLY,WITH NO IDICATIONS OF , TORQUE FALLING OFF. !-WORK PIPE WHILE HOLDING 10 KFT-LBS TORQUE,PU=310 KLBS,SO=90 KLBS -SUCCESSFULLY STAGE UP PUMPS TO 3 BPM,600 PSI,OBSERVING INTERMITTENT PACKOFFS,KEEPING THE PIPE MOVING -SERVICE AND GREASE RIG WHILE WORKING PIPE • I CONTACTED ANCHORAGE ENGINEERING TEAM TO DISCUSS PLAN FORWARD AND RECIEVED OCN#4 WITH OPERATING LIMITS FOR WORKING STUCK CASING: PRE JOB SAFETY MEETING BEFORE INCREASING STRING WEIGHT -REVIEWED BOUNDARY CONDITIONS:SET ' POINTS FOR PRESSURE,TORQUE,MAXIMUM AND MINIMUM STRING WEIGHT.DISCUSSED WELL CONTROL METHODS AND CONFIRMED 1 CASING COLLAR SPACE OUT IN THE BOP STACK.ESTABLISH ENTIRE RIG FLOOR AS A I RESTRICTED AREA WHILE CONDUCTING OVERPULL OPERATIONS. ' -WORK THE STRING UP WEIGHT FROM 350 KLBS TO 440 KLBS IN 10 KLB INCREMENTS WITH 10 KFT-LBS TORQUE AND PUMPS AT 3 BPM PERFORMED(2)STRAIGHT PULLS TO 480 KLBS WITH NO TORQUE OR PUMPS.UNABLE ' 'TO PULL FREE. 22:30 - 00:00 1.50 CASING ' N 11,800.00 INTI PUMP BAROID SPOTTING PILL(BLACK !MAGIC SFT)IN THE LOWER HALF OF THE HOLE , -RIG UP TRUCK TO CHEMICAL INJECTION LINE AND PUMP DIRECTLY TO THE INJECTION PUMPS BYPASSING THE PITS. -PUMP AT 2-3 BPM,515-600 PSI.FINAL PRESSURE OF 550 PSI AT 3 BPM -NO LOSSES OBSERVED WHILE PUMPING. -MW104PPG IN,10.5PPG OUT Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 29 ower Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/30/2017 00:00 - 02:00 2.00 CASING N 11,800.00 INTI CONTINUE TO CIRCULATE BAROID BLACK MAGIC SFT PILL TO THE LOWER HALF OF THE OPEN HOLE SECTION -RIG UP TRUCK TO CHEMICAL INJECTION LINE AND PUMP DIRECTLY TO THE INJECTION PUMPS BYPASSING THE PITS. -PUMP AT 2-3 BPM,515-600 PSI.FINAL PRESSURE OF 550 PSI AT 3 BPM -NO LOSSES OBSERVED WHILE PUMPING. MW 10.4 PPG IN,10.5 PPG OUT BLACK MAGIC IN PLACE AT 0200 HRS 02:00 - 07:00 5.00 CASING N 11,800.00 INTI WAIT FOR 5 HOURS WITH BLACK MAGIC PILL IN PLACE PER BAROID RECOMMENDATION -MONITOR WELL VIA TRIP TANK:STATIC 07:00 - 12:00 5.00 CASING N 11,800.00 INTI WORK PIPE AND ATTEMPT TO FREE PER OPERATIONAL PARAMETERS FROM OCN#5: -WORK 10 KFT-LBS OF SURFACE TORQUE DOWN THE CASING -WORK BETWEEN 480 KLBS OVERPULL (INCLUDING TD AND VOLANT TOOL WEIGHT) IN 10 KLB INCREMENTS AND 40 KLBS DOWN INSPECT DRILLING LINE FOR EXCESSIVE WEAR OBSERVE NO PIPE MOVEMENT -CONDUCT(3)STRAIGHT PULL ATTEMPTS WITH NO TORQUE IN THE STRING TO 500 KLBS,WITH NO SUCCESS FREEING PIPE 12:00 - 13:00 1.00 CASING N 11,800.00 INTI CIRCULATE BLACK MAGIC SFT PILL TO THE UPPER HALF OF THE OPEN HOLE SECTION -2 BPM,550 PSI 13:00 - 19:00 6.00 CASING N 11,800.00 INTI ,ALLOW BLACK MAGIC SFT PILL TO SOAK IN TOP HALF OF OPEN HOLE SECTION PER BAROID RECOMMENDATION TROUBLESHOOT INABILITY TO DISENGAGE VOLANT TOOL FROM 7"CASING: -AFTER WORKING PIPE WITH HIGH OVERPULLS,SLIPS ON VOLANT TOOL BECAME WEDGED INTO INTERNAL PIPE BODY OF 7"CASING ABLE TO DISENGAGE VOLANT TOOL WITH j RIG TONGS -ADD 5'PUP TO TOP OF 7"CASING STUB, MADE UP NEW VOLANT TOOL TO TOP OF 5' PUP -MONITOR WELL VIA TRIP TANK:STATIC 19:00 - 20:00 1.00 CASING N 11,800.00 INTI WORK PIPE AND ATTEMPT TO FREE PER OPERATIONAL PARAMETERS FROM OCN#5: -WORK 10 KFT-LBS OF SURFACE TORQUE DOWN THE CASING -WORK BETWEEN 480 KLBS OVERPULL (INCLUDING TD AND VOLANT TOOL WEIGHT) IN 10 KLB INCREMENTS AND 40 KLBS DOWN -CONDUCT(2)STRAIGHT PULLATTEMPTS WITH NO TORQUE OR PUMPS TO 500 KLBS, WITH NO SUCCESS FREEING PIPE Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 30Gote`i` Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM I Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT Total Depth I Phase I Description of Operations (hr) (usft) 20:00 - 23:30 3.50 CASING N 11,800.00 INTI ATTEMPT TO BREAK OUT VOLANT TOOL FROM 7"CASING -EXPERIENCE SAME ISSUE WITH INABILITY TO DISENGAGE VOLANT TOOL DUE TO SLIPS BEING WEDGED INTO PIPE BODY OF 5'PUP -ABLE TO DISENGAGE VOLANT TOOL WITH RIG TONGS -RIG DOWN VOLANT AND SEND OUT -MONITOR WELL VIA TRIP TANK:STATIC I-GREASE WASH PIPE AND RIG FLOOR EQUIPMENT DURING VOLANT TOOL I TROUBLESHOOTING -SEE ATTACHED EMAIL WITH MORE DETAILS 23:30 - 00:00 0.50 PXA N 11,800.00 INTI PICK UP WIRELINE SHEAVES AND TOOLS TO RIG FLOOR.RIG UP WIRELINE BEAM.CLEAN AND CLEAR RIG FLOOR. 7/31/2017 00:00 - 07:00 7.00 PXA N 11,800.00 INTI CONTINUE RIGGING UP ELINE.PERFORM ELINE FREE POINT TO DETERMINE STUCK POINT OF 7"CASING. AT 3100'MD:FREE -AT 3500'MD:FREE -AT 3690'MD:PARTIALLY FREE(20%PIPE MOVEMENT) -3750'MD:STUCK -AT 3800'MD:STUCK 07:00 - 16:00 9.00 PXA N 11,800.00 INTISTAGE UP FLOW RATE IN 1/2 BBL INCREMENTS TO 3 BPM -MAKE UP CROSSOVER ON TOP OF 7" CASING,MAKE UP TOP DRIVE I-CIRCULATE BLACK MAGIC PILL OUT OF THE HOLE AND DUMP TO CUTTINGS BOX -STAGE UP FLOW RATE TO 3 BPM,550 PSI -OBSERVE INTERMITTENT PACKOFFS SIMOPS: -LAY DOWN STANDS OF 4"DRILLPIPE I OFFLINE WITH WORN OUT HARD BANDING 16:00 - 17:00 1.00 PXA N 11,800.00 INTI RIG UP CEMENTERS AND VOLANT TOOL -RIG UP CEMENT HOSE WITH SWIVEL AND BLOCK VALVE TO THE VOLANT TOOL -PICK UP AND STAB VOLANT INTO THE 7" I_CASING STUB Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 31 ot34' Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 17:00 - 23:30 6.50 PXA N 11,800.00 INTI STAGE UP FLOW RATE IN 1/2 BBL INCREMENTS IN PREPARATION FOR CEMENT JOB.ESTABLISH INJECTION RATES PER OCN#7. -OBSERVE INTERMITTENT PACKOFFS WHILE ATTEMPTING TO STAGE UP TO FULL CEMENTING RATE ESTABLISH INJECTION RATE,STAGE UP PUMPS IN 1/2 BBL INCREMENTS FROM 2 BPM TO 5 BPM. @ 2 BPM=1500 PSI @ 2.5 BPM=1550 PSI,1%FLOW @ 3 BPM=1550 PSI,1%FLOW @ 3.5 BPM=1570 PSI 1%FLOW @ 4 BPM=1585 PSI,1%FLOW @ 4.5 BPM=1600 PSI,3%FLOW @ 5 BPM=1620 PSI,3%FLOW TOTAL=39 BBLS INJECTED SIMOPS: -PRESSURE TEST CEMENT LINE OFFLINE '250 PSI LOW/5000 PSI HIGH,5 MINUTES ,EACH CONTINUE LAYING DOWN STANDS OF 4" DRILL PIPE FOR HARD BANDING 23:30 - 00:00 0.50 PXA N 11,800.00 INTI 1 SERVICE WELL CENTER AND OFFLINE ST-80S. Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 32 t Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 8/1/2017 00:00 - 04:00 4.00 PXA N 11,800.00 INTI PERFORM 7"INTERMEDIATE P&A CEMENT 'JOB PER OCN#7 AS FOLLOWS: -PUMP 25 BBLS OF 12.0 PPG MUDPUSH II SPACER AT 5 BPM FROM THE CEMENTERS -UNSTING VOLANTTOOLAND DROP BOTTOM PLUG WITH TEFLON PUSHER TOOL -PUMP 76 BBLS OF 15.3 PPG CLASS G CEMENT(YIELD=1.32 FT3/SACK)AT 5 BPM, EXCESS VOLUME 40% UNSTING VOLANT TOOL AND DROP FIRST TOP PLUG WITH TEFLON PUSHER TOOL I-PUMP 24 BBLS OF 15.3 PPG CLASS G I CEMENT(YIELD=1.32 FT3/SACK)AT 5 BPM -UNSTING VOLANT TOOL AND DROP SECOND TOP PLUG WITH TEFLON PUSHER TOOL PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.4 PPG LSND MUD PER SLB CEMENTICS PROGRAM -SCHLUMBERGER KICK OUT WITH 10 BBLS 8.3 PPG FRESH WATER -SWAP OVER TO RIG PUMPS FOR DISPLACEMENT 300 BBLS DISPLACED AT 5 BPM:ICP=1000 PSI,0%RETURN FLOW,FCP=1320 PSI,0% RETURN FLOW -REDUCE RATE TO 3 BPM FOR 45 BBLS,ICP =1234 PSI,0%RETURN FLOW,FCP=1300 PSI,0%RETURN FLOW REDUCE RATE TO 2 BPM FOR 28 BBLS PRIOR TO PLUG BUMP.FINAL CIRCULATING PRESSURE OF 1370 PSI. -BUMP PLUG AT 4077 STROKES/377 BBLS DISPLACED -CEMENT IN PLACE AT 04:07 HRS ON 8/1/2017 -INCREASE PRESSURE TO 3500 PSI ON PLUG BUMP FOR 7"CASING TEST TOTAL DISPLACEMENT VOLUME=377.1 BBLS (MEASURED BY 4077 STROKES @ 96%PUMP EFFICIENCY) TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE=100% 04:00 - 06:00 2.00 PXA N 11,800.00 INTI PERFORM 30 MINUTE PRESSURE TEST OFT' CASING TO 3500 PSI PER OCN#7 i-OBSERVE PRESSURE TREND INCREASING THROUGHOUT TEST.CEMENT BEGINNING TO CURE,RESULTING IN AN INCREASE IN TEMPERATURE/PRESSURE. -OBSERVE WELL FLOWING ON THE ANNULAR SIDE AT AN INITIAL RATE OF-20 BBLS/HR -SHUT IN WELL WITH ANNULAR PREVENTER WITH CLOSED CHOKE PER STANDING ORDERS AT 0600 HRS Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* North America Page 33 ot=e4 Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 06:00 - 08:00 2.00 PXA N 11,800.00 INTI PERFORM EXHALE TEST PER BP BREATHING AND EXHALE TESTING RP -SHUT IN ANNULAR TO CLOSED CHOKE -OBSERVE PRESSURE CLIMB ON ANNULUS FROM 80 PSI TO 410 PSI IN 37 MINUTES -NOTIFY WSUP OF WELL STATUS AND RECIEVE AUTHORIZATION TO PROCEED WITH EXHALE TEST TO CHARACTERIZE BREATHING BLEED#1: -OPEN CHOKE TO 25%,BLEED 2.5 BBLS IN 1:06 -CLOSE CHOKE,INITIAL PRESSURE=200 PSI -PRESSURE STABLE @ 410 PSI IN 9 MINUTES BLEED#2: 1-OPEN CHOKE TO 25%,BLEED 1.8 BBLS IN 1:13 -CLOSE CHOKE,INITIAL PRESSURE=210 PSI -PRESSURE STABLE @ 410 PSI IN 5 MINUTES -CONSULT WITH ANCHORAGE TEAM ABOUT RESULTS OF INITIAL EXHALE TESTING. !DECISION MADE TO WAIT FOR CEMENT TO REACH 200 PSI TO AVOID COMPRIMISING INTEGRITY OF CEMENT JOB. 08:00 - 13:30 5.50 PXA N 11,800.00 INTI WAIT FOR CEMENT TO REACH 200 PSI COMPRESSIVE STRENGTH -OBSERVE ANNULAR PRESSURE DECREASE I TO 340 PSI Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 34 Qf 54 Operation Summary Report Common Well Name:C-34 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM I Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 13:30 - 16:00 2.50 PXA N 11,800.00 INTI CONTINUE PERFORMING EXHALE TEST PER BP BREATHING AND EXHALE TESTING RP. RECEIVE AUTHORIZATION FROM ANCHORAGE TEAM TO OPEN CHOKE AND MONITOR BLEED BACK EVERY 15 MINUTES TO VERIFY FLOW IS STILL DECREASING. BLEED#3: -OPEN CHOKE,BLEED 3.1 BBLS IN 3:30 -CLOSE CHOKE,PRESSURE STABLE @ 300 PSI IN 15 MINUTES BLEED#4: -OPEN CHOKE,BLEED 3.1 BBLS IN 4:00 -CLOSE CHOKE,PRESSURE STABLE @ 270 j PSI IN 15 MINUTES (BLEED#5: OPEN CHOKE,BLEED 3.8 BBLS IN 6:00 -CLOSE CHOKE,PRESSURE STABLE @ 220 PSI AFTER 15 MINUTES BLEED#7: --OPEN CHOKE,BLEED 3.6 BBLS IN 6:45 CLOSE CHOKE,PRESSURE STABLE @ 150 PSI AFTER 15 MINUTES BLEED#8: -OPEN CHOKE,BLEED 2.6 BBLS IN 9:45 -CLOSE CHOKE,PRESSURE STABLE @ 130 'PSI AFTER 15 MINUTES CONSULT WITH WSUP ON RESULTS -RECEIVE AUTHORIZATION TO OPEN CHOKE AND MONITOR VOLUME VIA TRIP TANK. 16:00 - 17:00 1.00 PXA N 11,800.00 INTI RIG DOWN VOLANT TOOL -DISENGAGE VOLANT TOOLAND RIG DOWN CEMENT LINE -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 17:00 - 23:00 6.00 PXA N 11,800.00 INTI RIG UP E-LINE AND ENCOUNTER OBSTRUCTION 18'BELOW THE ROTARY TABLE -RIG UP 3 SHEAVE SYSTEM -MAKE UP CROSSOVER,SIDE ENTRY PUP AND HIGH PRESSURE PACKOFF -MAKE UP JUNK BASKET,6-1/8"GAUGE RING ASSEMBLY AND RUN IN THE HOLE -TAG OBSTRUCTION 18'BELOW THE ROTARY TABLE,AT 7"COLLAR CONNECTION. ATTEMPT TO PASS THROUGH OBSTRUCTION j WITH NO SUCCESS. MAKE UP JUNK BASKET WITH 6"GAUGE RING ASSEMBLY AND RUN IN THE HOLE -TAG OBSTRUCTION 18'BELOW THE ROTARY TABLE,UNABLE TO PASS THROUGH -MAKE UP JUNK BASKET WITH 5-1/2"GAUGE RING AND RUN IN HOLE WITH NO ISSUES -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 35 abert Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 123:00 - 23:30 0.50 PXA N 11,800.00 INTI RUN IN THE HOLE WITH E-LINE TO TAG TOP j PLUG IN 7"CASING -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 23:30 00:00 0.50 KILLW N 11,800.00 INTI SERVICE PIPE CAT -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 8/2/2017 00:00 - 01:00 1.00 PXA N 11,800.00 INTI CONTINUE RUNNING IN THE HOLE WITH j5-1/2"GAUGE RING AND JUNK BASKET ON E-LINE AND TAG TOP PLUG AT 9983'MD WITH AOGCC REPRESENTATIVE GUY COOK -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK 01:00 - 02:00 1.00 PXA N 11,800.00 INTI PRESSURE TEST CASING TO 3500 PSI HIGH FOR 30 MINUTES -TEST WITNESSED BY AOGCC 1 REPRESENTATIVE GUY COOK -PASSING TEST:SEE ATTACHED PRESSURE TEST DOCUMENTATION -RE-TAG TOP PLUG WITH JUNK BASKET AT 9983'MD AFTER PRESSURE TEST -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 02:00 - 03:30 1.50 PXA N 11,800.00 INTI PULL OUT OF THE HOLE WITH 5-1/2"GAUGE RING AND JUNK BASKET ASSEMBLY FROM 9983'MD TO SURFACE. -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 03:30 - 07:00 3.50 PXA N 11,800.00 INTI RIG DOWN PRESSURE CONTROL ON 7" CASING AND PERFORM GAUGE RING RUN TO 4100'MD -RUN IN HOLE WITH 6.06"GAUGE RING AND TAG OBSTRUCTION AT 18' -CHANGE OUT GAUGE RING TO 5.75"AND RUN IN HOLE.ABLE TO PASS OBSTRUCTION WITH NO ISSUE TO 4100'MD -POOH WITH WIRELINE GAUGE RING -CONTINUE MONITORING WELL THROUGH OPEN CHOKE.DECREASING BLEED BACK. 07:00 - 09:30 2.50 PXA N 11,800.00 INTI 1 WAIT ON SCHLUMBERGER CHEMICAL CUTTER -OBTAIN APPROVAL FROM DOWN TO OPEN ANNULAR PREVENTER AT 0745 HOURS 09:30 - 16:00 6.50 PXA N 11,800.00 INTI 'RIG DOWN GAUGE RING RUN EQUIPMENT AND RIG UP E-LINE TO RUN CHEMICAL CUTTER -BREAK DOWN GAUGE RING RUNNING TOOL -RE-HEAD WIRELINE CABLE -MAKE UP CCL AND CHEMICAL CUTTER,AND ZERO TOOL TO RIG FLOOR -RUN IN THE HOLE WITH CHEMICAL CUTTER TO 300'MD -RIG UP 7"CROSS/HIGH PRESSURE PACK OFF ASSEMBLY -LATCH ELEVATORS,PICK UP TO 135 KLBS (20 KLBS OVERPULLTO KEEP THE CASING IN TENSION)AND SET CASING IN SLIPS Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 36 e4 Operation Summary Report Common Well Name:C-34 I AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay j Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To I Hrs l Task Code NPT Total Depth Phase I Description of Operations (hr) I (usft) 16:00 - 20:30 4.50 PXA N 11,800.00 INTI PERFORM CHEMICAL CUT AT 3576'MD -RUN IN THE HOLE WITH CHEMICAL CUTTER WITH NO ISSUES -FIRE CHEMICAL CUTTER,NO VISUAL MOVEMENT IN PIPE -PULL OUT OF THE HOLE WITH WIRELINE AND RIG DOWN CUTTER LATCH ELEVATORS AND CONFIRM CUT:PU =120 KLBS -RIG DOWN WIRELINE 20:30 - 21:30 1.00 PXA N 11,800.00 INTI RIG UP TO LAY DOWN 7"CASING '-RIG UP DOYON CASING TONGS -PICK UP AND LAY DOWN 1 JOINT OF 7",RIG DOWN 8'BAIL EXTENSIONS -PICK UP THREAD PROTECTORS FOR 7" CASING SIMOPS:PRESSURE TEST CHOKE MANIFOLD OFF-LINE 21:30 22:30 1.00 PXA N 11,800.00 INTI LAY DOWN 7",26#,VTHC CASING PULL(6)JOINTS,AND OBSERVE INCORRECT HOLE FILL(1/2 BBL GAIN IN TRIP TANK) -ADJUST PULLING SPEED TO ACCOUNT FOR SWABBING DUE TO THICK MUD AND LOW ANNULAR CLEARANCE 22:30 - 23:00 0.50 PXA N 11,800.00 INTI LUBRICATE RIG 23:00 - 00:00 1.00 PXA - N 11,800.00 INTI BUILD SOAP PILL WITH BRINE AND CIRCULATE SURFACE TO SURFACE TO ALLEVIATE ISSUES WITH THICK MUD -RETURNS CONTAINED TRACES OF BLACK MAGIC PILL AND THICK CLOBBERED UP MUD 8/3/2017 00:00 - 00:30 0.50 PXA N 11,800.00 INTI COMPLETE CIRCULATING BARAKLEAN SOAP PILL SURFACE TO SURFACE -6 BPM,275 PSI 00:30 - 04:30 4.00 PXA N 11,800.00 INTI LAY DOWN 7",26#,L-80,VTHC CASING FROM 3300'TO SURFACE -TOTAL OF 86 JOINTS AND 13.34'CUT JOINT -CLEAN CUT AT BOTTOM OF CUT JOINT -MONITOR WELL VIA TRIP TANK:GOOD HOLE FILL SIMOPS: CONTINUE TESTING CHOKE MANIFOLD OFFLINE 04:30 - 05:00 0.50 PXA N 11,800.00 INTI RIG DOWN DOYON CASING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR.CONTINUE TESTING CHOKE MANIFOLD OFFLINE. 05:00 - 06:00 1.00 BOPSUR N 11,800.00 INTI CHANGE OUT UPPER RAMS FROM 7"FBRS TO 2-7/8"X 5"VBRS -DRAIN STACK,CLOSE BLIND RAMS 06:00 - 09:30 3.50 BOPSUR N 11,800.00 INTI PERFORM FULL BOPE TEST TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 4"AND 5"TEST JOINTS -TEST ALARMS,PVT AND FLOW SHOW -ALL TESTS PASSING PERP S G B AND AOGCC REQUIREMENTS;SEE ATTACHED TEST CHART TEST WITNESS WAIVED BYAOGCC REP GUY COOK Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 37 ofog Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date From-To I Hrs I Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 09:30 - 10:00 ' 0.50 BOPSUR N 11,800.00 INTI TEST ANNULAR PREVENTER AGAINST JOINT OF 7",26#,L-80 VTHC CASING TO INSPECT FOR PIPE DEFORMATION FROM FINGERS OF ANNULAR PREVENTER. -PULL TEST PLUG AND SET 9"ID WEAR RING,RIG DOWN TEST EQUIPMENT AND BLOW DOWN LINES -OBSERVE PIPE BODY DEFORMATION WITH ANNULAR PRESSURE AT 1500 PSI -ATTEMPT AGAIN WITH ANNULAR PRESSURE AT 1000 PSI,OBSERVE SAME PIPE DEFORMATION AS BEFORE 10:00 - 12:00 2.00 STWHIP N 11,800.00 INTI WAIT ON E-LINE UNIT TO ARRIVE ON LOCATION 12:00 - 13:00 1.00 STWHIP N 11,800.00 INTI 'RIG UP E-LINE TO SET EZSV -RIG UP SHEAVE TO WIRE LINE BEAM AND ELEVATORS —RAN WIRE THROUGH TOP SHEAVE AND RAISE TOP DRIVE -MAKE UP WEIGHT BAR,CCLAND DRIFT FOR FIRST RUN 13:00 - 15:30 2.50 STWHIP N 11,800.00 INTI RUN IN HOLE WITH GAUGE RING JUNK BASKET ASSEMBLY AND TAG TOP OF STUMP AT 3550'MD.PULL OUT OF HOLE WITH IASSEMBLY AND RIG DOWN DRIFT. 15:30 - 18:30 3.00 STWHIP N 11,800.00 INTI MAKE UP AND RUN IN HOLE WITH 9-5/8"EZSV AND CCL MAKE UP EZSV AND ARMING HEAD TO PLUG AND RUN IN HOLE -CCL LOG FAILURE,UNABLE TO LOG COLLARS 18:30 - 21:00 2.50 STWHIP N 3,414.00 INTI CHANGE OUT CCLAND RECONFIGURE CCL ON E-LINE BHA.SET EZSV AT 3414'MD AND PULL OUT OF HOLE WITH WIRELINE. -SET PLUG 2'BELOW COLLAR:COLLAR LOCATED AT 3412'MD -RIG DOWN WIRELINE TOOLS AND SHEAVES 21:00 - 22:00 1.00 STWHIP N 3,414.00 INTI PRESSURE TEST 9-5/8"CASING AND EZSV TO 3500 PSI HIGH 30 MINUTES PER BP PRESSURE TESTING REQUIREMENTS PASSING TEST:RECEIVE APPROVAL FROM WSUP TO PROCEED -SEE ATTACHED PRESSURE TESTING DOCUMENTS -3.5 BBLS PUMPED,3.5 BBLS BLEED BACK 22:00 - 22:30 0.50 STWHIP N 3,414.00 INTI GREASE WASH PIPE AND BLOCKS.CHECK HYDRAULIC OIL LEVELS IN TOP DRIVE 22:30 - 00:00 1.50 BOPSUR N 3,414.00 INTI CHANGE OUT ANNULAR ELEMENT -BLOW DOWN LINES AND SUCK OUT STACK -CLOSE BLIND RAMS AND RUN IN RAM LOCKS -BLEED OFF ACCUMULATOR AND BREAK BOLTS ON BONNET CAP -CHANGE OUT ELEMENT 8/4/2017 I 00:00 - 01:00 1.00 BOPSUR N 3,414.00 INTI CONTINUE CHANGING OUT ANNULAR ELEMENT.TORQUE CAP BOLTS TO SPEC, INSTALL BELL NIPPLE AND AIR UP BOOTS. Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 38 oaf, Operation Summary Report Common Well Name:C-34 1AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-348 KB @83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth 1 Phase 1 Description of Operations (hr) (usft) 01:00 - 02:00 1.00 BOPSUR N 3,414.00 INTI PICK UP JOINT OF 7",26#,L-80 VTHC CASING AND CLOSE NEW ANNULAR ELEMENT ON JOINT TO TEST FOR PIPE DEFORMATION. -START WITH 1000 PSI CLOSING PRESSURE AND INCREASE IN 100 PSI INCREMENTS TO 11500 PSI 1-FUNCTION OPEN/CLOSED 5 TIMES AT 1500 I PSI INSPECT PIPE AND OBSERVE NO MARKS OR COLLAPSE OF 7"JOIINT 02:00 - 03:00 1.00 BOPSUR N 3,414.00 INTI MAKE UP TEST JOINT AND PULL WEAR RING. INSTALL TEST PLUG AND RILDS PER CAMERON.FILL STACK AND AIR OUT LINES. 1-DRIFT STACK WITH 13-1/2" OD TEST PLUG 03:00 - 05:00 2.00 BOPSUR N 3,414.00 INTI PRESSURE TEST ANNULAR WITH 4"AND 7" TEST JOINTS -250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH -PULL TEST PLUG -INSTALL 9"ID WEAR RING AND RUN IN LOCK DOWNS 05:00 - 07:00 2.00 STWHIP N 3,414.00 INTI MAKE UP AND RUN IN THE HOLE WITH 9-5/8" TRACKMASTER WHIPSTOCK ASSEMBLY TO 1220'MD -PICK UP 9 6-1/2"SPIRAL COLLARS -PU 95 KLBS;SO 95 KLBS AT 1220'MD 07:00 - 09:30 2.50 STWHIP N 3,414.00 INTI RUN IN THE HOLE WITH 9-5/8"WHIPSTOCK 'ASSEMBLY ON 4"DRILL PIPE STANDS OUT OF THE DERRICK -FROM 1220'MD TO 3400'MD RUN IN THE HOLE AT 45 FT/MIN -FILL PIPE EVERY 2000' -MONITOR WELL WITH TRIP TANK,GOOD DISPLACEMENT -PU 129 KLBS,SO 129 KLBS AT 3400'MD 09:30 - 11:00 1.50 STWHIP N 3,414.00 INTI RUN GYRO ON WIRELINE AND OBTAIN TOOLFACE TO ORIENT WHIPSTOCK -ORIENT WHIPSTOCK TO 225°TRUE AZ -WORK PIPE AND VERIFY ORIENTATION 11:00 - 12:00 1.00 STWHIP N 3,414.00 INTI RUN IN THE HOLE AND TAG EZSV AT 3415' I MD,SET DOWN 10K TO SETANCHOR. PICK UP 5'PER SLB FISHING REPRESENTATIVE AND ATTEMPT TO SET DOWN ON ANCHOR;ANCHOR NOT HOLDING WEIGHT. MAKE 3 MORE ATTEMPTS TO SET WHIPSTOCK WITHOUT SUCCESS.DISCUSS WITH ODE. PICK UP 10'OFF EZSV AND ATTEMPT TO SET DOWN ON ANCHOR;ANCHOR STILL NOT HOLDING WEIGHT. SLACK OFF AND TAG EZSVAT 3415'WITH 15K,PICK UP 5'AND ATTEMPT TO SET WHIPSTOCK AGAIN WITH NO SUCCESS. DISCUSS OPTIONS WITH ANCHORAGE TIME, DECISION MADE TO PULL WHIPSTOCK OUT OF THE HOLE. Printed 8/11/2017 10:12:37AM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 39 o(. Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:PARKER 272 Spud Date/Time:2/22/1988 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB©83.32usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 12:00 - 13:30 1.50 STWHIP N 3,414.00 INTI PULL OUT OF THE HOLE WITH THE WHIPSTOCK TO PICK UP THE BACKUP WHIPSTOCK. -MONITOR WELL FOR 10 MINUTES:STATIC -PU 130 KLBS AT 3400°MD WHIPSTOCK SET AND UNEXPECTEDLY SHEARED OFF MILLS AT 1225'MD. -SLACKED OFF AND SET DOWN 8K ON WHIPSTOCK TO VERIFY ANCHOR HOLDING 13:30 - 15:30 2.00 STWHIP N 3,414.00 INTI PULL OUT OF THE HOLE AND LAY DOWN WHIPSTOCK MILLING ASSEMBLY,FROM 1225' MD -STAND BACK HWDP AND DRILL COLLARS -LAY DOWN UBHO SUB AND TRI-MILL ASSEMBLY TO PIPE SHED 15:30 - 16:00 0.50 STWHIP N 3,414.00 INTI CLEAN AND CLEAR RIG FLOOR WHILE MOBILIZING TOOLS FOR FISHING WHIPSTOCK 16:00 - 16:30 0.50 FISH N 3,414.00 INTI PICK UP WHIPSTOCK FISHING ASSEMBLY PER SLB FISHING REPRESENTATIVE -OIL JARS,BUMPER SUB,FLOAT SUB,XO AND DIE COLLAR WITH CUT LIP GUIDE 16:30 - 17:00 0.50 FISH- N 3,414.00 INTI RUN IN THE HOLE WITH WHIPSTOCK FISHING ASSEMBLY ON 4"DRILL PIPE -FROM 139'MD TO 1244'MD -PU 57 KLBS,S O 59 KLBS AT 1240'MD 17:00 - 18:30 1.50 FISH _ N 3,414.00 INTI ENGAGE FISH PER SLB FISHING REPRESENTATIVE -ROTATE OVER FISH WITH 2 BPM,95 PSI AND 15 RPM -SET DOWN 3 KLBS WHILE ROTATING AND CHASE WEIGHT DOWN UNTIL STRING STALLED WITH 5 KFT-LBS TORQUE -PICK UP TO 67 KLBS(10 KLBS OVER PICK WEIGHT)AND ALLOW OIL JARS TO BLEED OFF -PULL WHIPSTOCK FREE WITH 20 KLBS OVERPULL 18:30 - 19:30 1.00 FISH N 3,414.00 INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 1272'MD TO 139'MD -MONITOR WELL FOR 10 MIN:STATIC -PU 63 KLBS AT 1244'MD 19:30 - 21:00 1.50 FISH N 3,414.00 INTI STAND BACK COLLARS AND LAY DOWN FISH (WHIPSTOCK) -PULL WHIPSTOCK OUT OF THE HOLE AND CLOSE BLIND/SHEAR RAMS -REMOVE DIE COLLAR FROM WHIPSTOCK SLIDE PULLAND LAY DOWN WHIPSTOCK TO PIPE SHED -LAY DOWN FISHING ASSEMBLY TO PIPE SHED 21:00 - 21:30 0.50 STWHIP N 3,414.00 INTI PERFORM 5 MIN OPERATIONALASSURANCE PRESSURE TEST ON 9-5/8"CASING AND EZSV TO 3500 PSI-GOOD TEST 21:30 - 22:00 0.50 STWHIP N 3,414.00 INTI SERVICE ST-80 AND RIG FLOOR EQUIPMENT Printed 8/11/2017 10:12:37AM *Ali depths reported in Drillers Depths* North America ALASKA-BP Page 40 0, Operation Summary Report Common Well Name:C-34 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/15/2017 End Date: X3-018KN-C:(7,849,204.00) Project:Prudhoe Bay j Site:PB C Pad Rig Name/No.:PARKER 272 I Spud Date/Time:2/22/1988 12.00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00000662 Active datum:C-34B KB @83.32usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.0 STWHIP N 3,414.00 INTI 1-PICK UP AND RUN IN THE HOLE WITH I BACKUP WHIPSTOCK ASSEMBLY TO 1226'MD -PICK UP TRI-MILL,FLOAT SUB,FLEX JT AND UBHO ORIENT AND SCRIBE UBHO 8/5/2017 00:00 - 01:30 1.50 STWHIP N 3,414.00 INTI RUN IN THE HOLE WITH 9-5/8"WHIPSTOCK ASSEMBLY ON 4"DRILL PIPE,FROM 1226'MD TO 3400'MD -FILL PIPE EVERY 2000' PU 128 KLBS,SO 128 KLBS AT 3400'MD 01:30 - 02:30 1.00 STWHIP N 3,414.00 INTI RUN GYRO ON WIRELINE AND OBTAIN TOOLFACE TO ORIENT WHIPSTOCK -ORIENT WHIPSTOCK TO 221°TRUE AZ -WORK PIPE AND VERIFY ORIENTATION 02:30 - 03:00 0.50 STWHIP N 3,414.00 INTI RUN IN THE HOLE AND TAG EZSV AT 3415' MD,SET DOWN 10K TO SET ANCHOR. PICK UP 3'PER SLB FISHING REPRESENTATIVE AND SET DOWN ON ANCHOR WITH 15 KLBS. PICK UP TO NEUTRAL WEIGHT AND SET DOWN ON ANCHOR WITH 30 KLBS.OBSERVE WHIPSTOCK SHEAR OFF MILLS. PICK UP AND NEW PU WEIGHT 126 KLBS. 03:00 - 03:30 0.50 STWHIP N 3,414.00 INTI PERFORM 5 MIN OPERATIONAL ASSURANCE j PRESSURE TEST ON 9-5/8"CASING AND EZSV TO 3500 PSI-GOOD TEST -USE PRESSURE CROSSCHECK CHECKLIST 03:30 - 04:00 0.50 STWHIP N 3,414.00 INTI DISPLACE WELL FROM 10.5 PPG LSND TO 9.4 PPG MILLING FLUID j-16 BPM;ICP 1755 PSI,FCP 1260 PSI -MONITOR WELL FOR 10 MIN:STATIC 04:00 - 12:00 8.00 STWHIP N 3,414.00 INTI ESTABLISH MILLING PARAMETERS AND MILL WINDOW IN 9-5/8"CASING FROM 3388'MD TO 3402'MD PLUS 0'OF NEW FORMATION TO 3422'MD(3421'ND) -425 GPM,770 PSI ON,60-90 RPM,2-7 KFT-LBS TORQUE ON 1.5 KFT-LBS TORQUE OFF,1-5 KLBS WOB -PU 129 KLBS,SO 129 KLBS,ROT 128 KLBS MUD WEIGHT IN/OUT:9.4 PPG -PUMP TWO HIGH-VIS SWEEPS WHILE MILLING WINDOWAND DUMP:NO SIGNIFICANT INCREASE NOTED WORK MILLS THROUGH WINDOW WITH AND WITHOUT PUMPS AND ROTATION SEVERAL TIMES;NO DRAG NOTED. 12:00 - 12:30 0.50 STWHIP N 3,422.00 INTI CIRCULATE THE HOLE CLEAN -PUMP 35 BBL HIGH-VIS SWEEP;NO SIGNIFICANT INCREASE NOTED 425 GPM;810 PSI 12:30 - 15:00 2.50 STWHIP N 3,422.00 INTI RIG UP AND PERFORM LOT TO 12.8 PPG EMW AT 3388'MD(3388'TVD) -MONITOR WELL FOR 10 MIN:STATIC -MUD WEIGHT IN/OUT:9.4 PPG -PUMP 25.5 BBLS TO 600 PSI,BLEED BACK 19.8 BBLS -REVIEW WITH ODE AND RECEIVE ATP -BLOW DOWN CHOKE AND KILL LINES Printed 8/11/2017 10:12:37AM *AII depths reported in Drillers Depths* TREE= 6-3/8"CNV WELLHEAD= MCEVOY • C-34A Sib NOTES:WELL ANGLE>70°@ 9537' ACTUATOR= BAKER C _ - __ KB.ELEV= 67.51' I R�ELEV= 67.51' 20"CONDUCTOR H ? BF.ELEV= 36.9T KOP_- - - -- 5200' Max Angle= -95°@967T 3388' H 9-5/8"WHPSTOCK(08/05/17) Datum MD= _ _ 93_03' DatumTVD- ___.8800'SS 3415' H9-5/8"EZSV(08/04/17) 13-3/8"CSG,68#,L-80 BUTT,ID=12.415" H 2684' MLLOUT WINDOW(C-34B PB1) 3587-3596' 3582' H 9-5/8"WHPSTOCK(07/18/17) 3613' H9-5/8"EZSV(07/18/17) 4-1/2"SEVERED COLLAR(07/12/17) H 4092' .0,•••AA X414 CMT PLUG(07/01/17) H 6000' 111 �101�4,X11 8356' H4-1/2"BKR"L"SLD SLV,ID=3.813" 1111.1.1.1.111 Minimum ID =2.377" @ 9983' 1 0.4,„AAA.. :.i.4,„A A ‘e11-�. $416' —I TM/SBR SEAL ASSY,ID=�"t ."Y 3-3/16" X 2-7/8" LNR XO _ _________ 8431' -19-518'x 4-1/2"TM/HBBP PKR,D=3.958" 4-1/2"TBG PUNCH 4 SPF(06/28/17) --8409'-8413' 8450' H I DUMP BALED 5 GALLONS CMF(06/28/17) 5'TM/MLLOUT EXTENSION,D ---1. 8436' - 8458' -14-1/2"POSISET PLUG(06/28/17) IX 4-1/2"XO,D=3.958" -I 8442' - "----- .....----1 8460' H BKR 9-5/8"X 7"LNR HGR&TEBK SLV,D=? TOP OF 7"LNR JI 8460" 8474" -14-1/2"OTIS X NP,D=3.813" I8490' H3-1/2"BOT DEPLOY SLV,D=3.00" 8496' -13-1/2"PUP JOINT,D=2-867" 8506' -4-1/2"OTIS XN NP,MLLED TO 3.80"(04/05/06) 111BEHIND CT LINER 8509' -I3-1/2"HOWCO X NP,ID=2.813" 4-1/2"TBG,12.6#,L-80 AB-M BUTT, - 8537' 8536' -14-1/2"SHEAROUT SUB,D=? L�'� 0152 bpf,D=3.958" 8637' H4-1/2"WLEG,D=3.958" 8 CT LIKEN 3-1/2"LNR 8.81#,L-80 STL,.0087 bpf,D=2.867" -I 8539" I-- 8540' -I ELMD TT LOGGED 04/17/88 9-5/8"CSG,47#,L-80,0=8.681" -I 8761' • 8539' -1 3-1/2"X 3-3/16"XO,ID=2-786" 9141' H MARKER JOI"!T ESTIMATED TOP OF CEMENT -I 9100' •-• l•4 •�• •• • �••• MLLOUT WINDOW(C-34A) 9348'-9354' BKR GEN I WHPSTOCK(04/04/06) 9343' •�•• 9372' —2.18"WFD EXTENDED RA TAG ---1 -- { 9353' I- 4 ,`••-4.14*.„ • RANGE CEP(02/19/16) 'r 9972'CTM —1.81"WFD EXTENDED 7"LNR,26#,L-80 U4S,-0383 bpf,0=6.276" -I 9663' 11111111 11111111111111 RANGE CEP(11/16/14) 1111111 PERFORATION SUMMARY 11111111" 9983' —3-3/16"X 2-7/8"XO, 1111111 REF LOG:MCNL/CCL/GR ON 05/11/06 1111111111111111 D=2.377" 11E41 LOG:GEOLOGY PDC LOG '6.4'4.64.4.4.1 /( 9983' -RSH-UNKNOWN ANGLE AT TOP PERF:91"@ 10060' DUB BAILED 10 GALLONS H -9341' DEBRIS Note:Refer to Production DB for historical perf data CMT(06/27/17) / (11/15/14 TAG) SIZE SPF INFERNAL Opn/Sqz SHOT SOZ 3-3/16"LNR,6.2#,L-80 TCB, H 9983' 2" 6 9855-9885 C 11/16/14 0076 bpf,D=2.80" 2" 6 9900-9930 C 11/16/14 2" 6 9930-9960 C 11/15/14 ! PBTD H 11008' 2" 6 10060-11000 C 05/21/06 2-7/8"LNR,6.164,L-80 STL, 0058 bpf,ID=2.441" -I 11043" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNI 03/10/88 N18E ORIGINAL COMPLETION 07/05/17 MS/J1/13 MEL PLUG/SET PLUGS&CMT/TBG PUN WELL: G34A 05/12/06 NORDIC 1 CTD SIDETRACK(C-34A) 07/05/17 MRDYJMD SET BALANCE CMT PLUG(07/01/17) PERMIT No: 2060370 11/17/14 JGLJPJC PERFS/CEP/FISH(11/15-16/14) 07/13/17 MCW/JNE TBG PUNCH&SEVERED COLLAR API No: 50-029-21785-01 03/15/15 DU/PJC TREE C/O SEC 19,T11 N,R14E, 1565'FSL&881'FEL 02/22/16 CJN/JMD SET CEP(02/19/16) 05/24/17 JUANE)ADDED REF&BF ELEV BP Exploration(Alaska) °F TR • • • g \ \I 77: THE STATE Alaska Oil and Gas F ►:'i=�� �, of LA S KA Conservation Commission St;E 333 West Seventh Avenue *R , GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 pF Main: 907.279.1433 ALASFax: 907.276.7542 www.aogcc.alaska.gov Kenneth Allen Engineering Team Lead j�_ SCANNED BP Exploration(Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Pt. Prudhoe Bay Oil Pool, PBU C-34A Permit to Drill Number: 206-037 Sundry Number: 317-211 Dear Mr. Allen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. 7-1- Commissioner DATED this 6 day of June, 2017. RBDMS t(—JUN - 2 2017 STATE OF ALASKA • •LASKA OIL AND GAS CONSERVATION COMM! APPLICATION FOR SUNDRY APPROV IPti 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 Change Approved Program 0 Plug for Redrill B ' Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 206-037 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21785-01-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? RECEIVED��' Will planned perforations require a spacing exception? Yes 0 No I3 PBU C-34A• 9. Property Designation(Lease Number): 10. Field/Pools: MAY 2 3 2017 017 ADL 028305 ' PRUDHOE BAY,PRUDHOE OIL• 11. PRESENT WELL CONDITION SUMMARY �� Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): ✓ Plugs(MD): Ju Ck 11043 • 9031 • 9372 8925 2446 9372,9972 2157,2690,9983 Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" 33-113 34-114 Surface 2651 13-3/8" 33-2684 33-2684 5020 2260 Intermediate 8730 9-5/8" 31-8761 31-8409 6870 4760 Liner 888 7" 8460-9348 8147-8906 7240 5410 Liner 2553 3-1/2"x 3-3/16"x 2-7/8" 8490-11043 8173-9031 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 9855-11000 9029-9033 5-1/2"17#x 4-1/2"12.6# L-80 29-8539 Packers and SSSV Type: 4-1/2"TIW HBBP Packer Packers and SSSV MD(ft)and ND(ft): 8433/8123 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary H Wellbore Schematic Ej 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch lil Exploratory 0 Stratigraphic 0 Development ® . Service 0 14.Estimated Date for Commencing Operations: June 1,2017 15. Well Status after proposed work: Oil ❑ WINJ 0 WDSPL 0 Suspended ® • 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR 0 SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Gorham,Bradley M be deviated from without prior written approval. Contact Email: Bradley.Gorham@bp.com Authorized Name: Allen,Kenneth W Contact Phone: 907-564-4649 Authorized Title: Engineering Team Lead Authorized Signature: ,;. i,(„^...•----- - Date5f � /Z. COMMISSION US ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: .. Plug Integrity / BOP Test 7 Mechanical Integrity Test ❑ Location Clearance ❑ - 3 1-(y ) Other: 06 p "'e-5-t T a 3 S o P5 L "d /-E.) 7i�U Cl p --15�= (0/4q. A-vz✓fvlcr pr< ✓tv1 �-/ /41 z<v�a*i-c ptvy plact�- rh, °tppro✓ dPost Initial Injection MIT Req'd? Yes 0 No p -r r 20 A-/ C 23-, /11" C" Spacing Exception Required? Yes 0 No Cg` Subsequent Form Required: /r - 4 b i APPROVED BYTHE / Approved by: ilrf COMMISSIONER COMMISSION Date: C7-/ / vri, iii/ice RBDMS L" JUJ - 2 2017 ORIGINAL Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • 0 bP GP6eget/Jr/Age Bdr C-34A Sundry Application Well Type: Producer Current Status: Shut-in Request: P&A for rotary rig sidetrack Planned Pre-Rig Work Start Date: ASAP upon Sundry approval Planned Rig Start Date: Aug 1, 2017 05/20/2016 CMIT-TxIA to 3500 psi FAIL 02/23/17 MIT-OA to 1287 psi PASS 02/14/17 PPPOT-IC to 3500 psi PASS 02/02/15 PPPOT-T.to 5000 psi PASS MASP: 2,446 psi (7.57 ppg EMW in Sag River at 8,400' TVDss with 0.1 psi/ft gas gradient) Well History: C-34 was original drilled and completed as an lvishak Zone 1 producer. In 2006, a CTD sidetrack was drilled due to the high GOR of the C-34 wellbore. The well was shut-in in February of 2016 due to TxIA communication. Shortly after, slickline attempted to set a CIBP just above the top perforation at 9,855' MD. However, slickline made numerous attempts to get deeper than 9,380' MD and eventually set the plug at 9,372' MD. The plug is-102' TVD above the top perforation. The C-34B wellbore has no remaining well work options and therefore has been released for sidetrack. Scope of Work: Prior to rig arrival, the C-34B perfs will be abandoned via fullbore cement. Initially, 25'of cement will be dump bailed on ton of the CIBP. Secondly,the P&A plug will be placed on top of the-In-Ear 25'of cement. The plan is to not tag the dump bailed cement in order to prevent numerous rig ups for cementing and thus reducing HSE risk. Due to the request to not drift and tag the initial cement plug, it is proposed that an AOGCC representative witnesses the bail cement job. The final top of cement will be determined with a drift run followed by an integrity test of the tubing and IA.The 4-1/2"tubing will be cut and wellbore integrity will again be verified. The rig will then move over the well and pull the 4-1/2" tubing and the top —2 joints of 9-5/8" casing. A 9-5/8"whipstock will be used to mill a window out of the existing production casing at—3500' MD. This sidetrack is a horizontal producer targeting the Ivishak. The planned well is a two string, ultra-slimhole design using 7" intermediate casing and 4-1/2" production liner. The intermediate casing will be set at the top of the Sag River, and the production interval will be completed with a cemented and perforated liner. Acur, kC 04cr I -el( /Iraoet-1, 0.7.4g GD /1 N �� 4d qv Qper fc O4 1/Le s S�r Ov-i'N Le. f✓A7���` h 44 ria r4 f 4C�dr d _ •, it-et / - re° e'' u At we will fPChq i[ �4 t/t 4e4 7415. ��ri f 4f l e /ail. l�C& Ml td /SCOT",4b/Wcl C-34A Sundry 1 5/23/2017 C 55 .Tx D3 � o �\►" Pre-Rig Prep Work: r � 1. E Dump bail 25' cement on CIBP, Set Posiset above liner lap, dump bail cement oh posiset, punch holes in Tubing Mill out RQ Plug 2. F Balance cement plug per 10-60 3. S D&T Cement. Drift for Jet Cut. Pressure test control and balance lines. 4. F CMIT-TxIA to 3500 psi. 5. E Cut TBG 6. F CMIT-TxIA to 3500 psi and MIT OA 7. 0 Cement control and balance lines if necessary 8. W PPPOT-T and IC. Function LDS. 9. V Install Dry Hole Tree. Install Annulus Valves. Set TWC. Proposed Drilling Rig Operations: 1. MI/RU Parker 272. 2. Nipple down tree. Nipple up BOPE with 2-7/8" x 5" VBR's in both the bottom and upper ram cavities and tested to 250 psi low/3500 psi high. 3. Pull TWC. De-Complete: 4. RU and pull the 5-1/2" 17#x 4-1/2" 12.6#tubing from the pre-rig jet cut at-4,000' MD. 5. PU 9-5/8" String cutter and RIH. Cut 9-5/8"casing below wellhead. /C\ 6. Pull 9-5/8"Casing and CMIT-IAxOA to 1200 psi to confirm integrity. 7. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at-4000' MD. 8. Run scoop guide, bowen casing patch and bored out 13-3/8"wiper plug. 9. Displace well to milling fluid. End of Sundry: Start of Permit to Drill 10. PU and RIH with 9-5/8" Smith bottom-trip anchor whipstock assembly and 8.5"window milling assembly(to include full gauge string mills). Orient and set the whipstock 45 deg ROHS. Shear n off the whipstock.And mill window at-3,564' MD 11. Perform LOT to 12.7 ppg EMW to achieve 25 bbl kick tolerance. Drill 8-1/2"Intermediate Hole: 12. MU 8-1/2" intermediate hole RSS BHA (GR/RES/PWD) and drill build section to -5,412' MD. 13. Continue to drill ahead as per approved directional plan to TD at-11,810'MD in TSAG. Ensure mud weight is increased is increased to maintain wellbore stability in Kingak and HRZ formations. 14. At casing point, circulate hole clean and conditions mud as needed. 15. Perform short trip by bringing ghost reamer up inside window and run back to bottom. C-34A Sundry 2 5/23/2017 ! ! 16. At TD, circulate hole and condition mud as needed for 7" casing run. 17. POOH and lay down drilling assembly. If backreaming is necessary,trip back to TD and POOH on elevators for final trip out. 18. Change out upper rams to 7" FBR's and test to 250 psi low/3,500 psi high. Run and Cement 7" Casing: 19. RU, run 7"26#VAM TOP HC casing to TD. 20. Cement as per approved cement program. 21. Pressure test casing to 250 psi low/3500 psi high 22. Install 2-7/8"x 5"VBR rams in both upper and lower cavities and test BOPE to 250 psi low/3500 psi high. Drill 6-1/8" Production Hole: 23. MU 6-1/8" production hole BHA (GR/RES/Neu/Den) and RIH and tag the float collar or TOC. Drill out all but 10 ft of shoe track and then displace to production hole fluid. 24. Perform 30 minute no flow test. 25. Drill out remainder of shoe track. 26. Drill at least 20 ft but no more than 50 ft of new formation and CBU. 27. Pull BHA inside casing and perform FIT to 9.8 ppg EMW. 28. Continue to drill production hole to TD at—16,810' MD to access Zone 2 and Zone 4 reserves as per rig site and town geologist. a. If drilling ROP is affected and bit damaged is likely, consider performing trip to change out bit. 29. At TD, circulate wellbore clean and condition the mud as needed. 30. Perform wiper trip to the previous INT casing shoe. 31. Run back to bottom, circulate the hole clean and condition the mud for the 4-1/2" liner run. 32. POOH, lay down excess 4" drill pipe and 6-1/8" BHA. Run and Cement 4-1/2" Production Liner: 33. RU and run 4-1/2" 12.6#VAM TOP liner. 34. Cement as per approved cement program and circulate excess cement off top of liner. 35. Test Liner top packer and liner to 250 psi low/3500 psi high. Run 4-1/2"Completion: 36. RU and run a 4-1/2", 12.6 ppf, 13Cr-85, VamTop completion. Space out and land the tubing with the tubing tail inserted into the liner tie back sleeve. Run in lock down screws. 37. Displace well to seawater completion fluid through the IA. 38. Drop ball and rod with rollers to RHC plug. 39. Test tubing to 250 psi for 5 minutes and then set production packer with 3,500 psi. 40. Hold 3,500 psi for 30 minutes for tubing pressure test. 41. Bleed tubing pressure down to 2,000 psi. C-34A Sundry 3 5/23/2017 • • 42. Pressure test IA to 250 psi for 5 minutes/ 3,500 psi for 30 minutes. Bleed down Tubing to 0 psi and shear DCR-1. Pump both ways to confirm shear. 43. Pump enough diesel freeze protect fluid into the IA to protect to 2,200 ft MD on both tubing and IA. 44. ND BOP, 45. NU dry hole tree and adapter flange and test to 250 psi low/5000 psi high. 46. Install VR plugs in the annulus valves as needed and secure the well. Ensure that both IA and OA are protected by two barriers. 47. RDMO. Post Rig Operations: 1. DSM Pull TWC. 2. MIRU slick line. Pull ball and rod/RHC plug from landing nipple below production packer. 3. Run RPM log and determine perf interval 4. Perforate to access Zone 2 and Zone 4 reserves 5. Install GLVs. Drift SBHPS. 6. ASRC Flow Back 7. Install the well house, instrumentation Contingency Plan: 48. A deep cut of the 9-5/8" or a tieback of the 9-5/8" casing may be necessary (example: if the pre-rig MIT-OA or Rig work MIT-OA fails)Should this happen a USIT log will be run to determine the TOC in the 13-3/8"x 9-5/8"annulus. The casing will then be cut above the TOC and pulled. If the OA test fails, the 9-5/8"casing would be tied back to surface using the existing wellhead equipment. In the event that casing is pulled or ran,the BOPE top ram configuration will change to 9-5/8"fixed and then be changed back to 2-7/8"x 5"VBR's. If 9-5/8" is tied back to surface, the 7" casing would be run as a liner with 150' of overlap above the window. The cement job would not change in volume for the liner. Drilling Engineer: Brad Gorham (907) 564-4649 Production Engineer: Joleen Oshiro (907) 564-4606 Geologist: Josh Miller (907) 564-4523 C-34A Sundry 4 5/23/2017 TRS 6318"CW • C 34A Syr NOTES:WELL ANGLE>70°@ 9537' VbELLF EAD= MCEVOY ACTUATOR= BAKER C KB_LLE1J= 67.51' I 2157" —FISH-5-1/2"RQ PLUG KILLED TO 2.31"(07/04/06) BF.ELEV= 38.63' KOP= 5200' 20"CONDUCTORH ? DRIFTED 11/07/14 2.30" Max Angle= 950©-9-677' 2157' H5-1/2"OTIS HRQ SSSV NP,D=4.562" Datum MD= _9303' Datum ND= 8800'SS /� 2491' H5-1/2"X 4-1/2"XO,D=3.870" 5-1/2"TBG,17#,L-80 AB-M BUTT, H 2491' GAS LFT MANDRELS .0232 bpf,D=4.892" 111GAS MD ND DEV TYPE VLV LATCH PORT DATE 5 3090 3090 0 011S-LBD DOME RM 16 05/23/06 rr 13-3/8"CSG,68#,L-80 Bu ,ID=12.415" H 2684' 4 5086 5086 5 OTIS-LBD DOME RM 20 05/23/06 FISH-PART OF SETTING TOOL- — ? I 0 3 7003 6826 26 OTIS LBD DMY RA 0 03/08/88 2 7975 7704 24 OTIS-LBD DMY RA 0 03/08/88 3/16"X 1"W z 1.5"L(11/16/14) 1 8279 7983 23 OTSSLBD DMY RA 0 03/08/88 I Minimum ID =2.377" @ 9983' I I I 8356' —14-1/2"BKR"L"SLD SLV,D=3.813" 3-3/16" X 2-718" LNR XO _ _ 8416• HMV SBR SEAL ASSY,D=4.75"? 8431' —19-5/8'X 4-1/2"TNN FBBP PKR,D=3.958" 5'TNV MLLOUT EXTENSION,D= H 8436' X ?X 4-1/2"XO,D=3.958" H 8142' 8460' —I BKR 9-5/8"X 7"LNR HGR&TEBK SLV,ID=? TOP OF 7"LNR —1 8460' , 8474' H4-1/2"OTIS X NP,D=3.813" 8490' H 3-1/2"BOT DEPLOY SLV,D=3.00" 8495' —13-1/2"PUP DONT,D=2.867" 8506' 14-1/2"OTIS XN NP,MLLED TO 3.80"(04/05/06) BH'IIND CT LINER 8509' —13-1/2"HOVVCO X NIP,D=2.813" 4-1/2"TBG,12.6#,L-80 AB-M BUTT, —1 8537' / \ 8536" -1SUB,ID 4-1/2"SHEAROUT I .0152 bpf,D=3.958" --------- 8637' —14-1/2"WLEG,D=3.958" U CTT LIN 3-1/2"LNR 8.81#,L-80 STL,.0087 bpf,D=2.867" —1 8539' 8540' —I ELMD TT LOGGED 04/17/88 9-5/8"CSG,47#,L-80,D=8.681" -1 8761' 8539' —13-1/2"X 3-3/16"XO,D=- 2.786" J 9141' (MA RKB2 JOINT ESTIMATED TOP OF CE I34T I 9100' •• "•- �•• • �••• MLLOUT WINDOW(C-34A) 9348'-9354' • BKR GEN II HIPSTOCK(04/04/06) H 9343' •• • W • •��••. 9372' 12.18"WFD EXTEPDED RA TAG H 9353' I ---4! �"iti.` RANGE CEP(02/19/16) • '1/ 7"LNR,26#,L-80 IJ4S,.0383 bpf,D=6.276" —1 9663' 11111111 9972'CTM 1.81"WFD EXTENDED 41�.�1�.�.�.�.-4 RANGE CEP(11/16/14) 1111111 PERFORATION SUMMARY 1111111/ 9983' —3-3/16"X 2-7/8"XO, 1111111 REF LOG:MCNJCCUGR ON 05/11/06 1111111111111111 D=2.377" TEN LOG:GEOLOGY PDC LOG 4.4.4.6.6.6.4.1 // 9983' _—FISH-UNKNOWN ANGLE AT TOP PERF:91"@ 10060' DEBRIS Note:Refer to Production DB for historical pert data 3-3/16"LNR,6.2#,L-80 TCI, —I 9983' (11/15/14 TAG) SIZE SPF INTERVAL Opn/Sgz SHOT SOZ .0076 bpf,ID=2.80" 2" 6 9855-9885 C 11/16/14 2" 6 9900-9930 C 11/16/14 2" 6 9930-9960 C 11/15/14 PBTD H 11008' 2" 6 10060-11000 C 05/21/06 2-7/8"LNR,6.16#,L-80 STL, 0058 bpf,ID=2.441" —1 11043' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/10/88 N18E ORIGINAL COMPLETION 11/17/14 JGUPJC PEWS/CEP/FISH(11/15-16/14) WELL: C-34A 05/12/06 NORDIC 1 CTD SIDETRACK(C-34A) 03/15/15 DUI PJC TREE C/O PERMT No:' 060370 07/04/06 RDB/PAG KILLED PQR PLUG 02/22/16 CJWJKID SET CEP(02/19/16) AR No: 50-029-21785-01 12/17/07 RLIWPJC DRLG DRAFT CORRECTIONS SEC 19,T11 N,R14E, 1565'FSL&881'FEL 03/13108 OOB/PJC DRLG DRAFT CORRECTIONS 09/27/14 MGB/PJC PILL RQ PLUG BP Exploration(Alaska) TIRES 6318"CNV _ • C 34A SSY NOTES:WELL ANGLE>70°@ 9537' WELLHEAD= MVOY ACTUATOR= BAKER C KB.REV= 67.51' (�P Q_A I 2157' —FISH-5-1/2"RQ PLUG MILLED TO 2.31"(07/04/06) BF R PI= 38.63' DRIFTED 11/07/14 2.30" KOP= 5200' 20"CONDUCTOR H ? / 111 111 @ Max Angle= 95°@ 9677' I 2157' H5-1/2"OTIS HRQ SSSV NP,D=4.562" ( tum WD= 9303' Datum ND= 8800 SS 2491' —I 5-1/2"X 4-1/2"x0,D=3.870" 5-1/2'TBG,17#,L-80 AB-M BUTT, H 2491' GAS LFT MANDRELS .0232 bpf,ID=4.892' ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3090 3090 0 OTIS-LBD DONE RM 16 05/23/06 13-3/8"CSG,68#,L-80 BUTT,ID=12.415" —I 2684' 4 5086 5086 5 OTIS-LBD DOME RM 20 05/23/06 FISH-PART OF SETTING TOOL- —I ? 3 7003 6826 26 OTIS-LBO DMY RA 0 03/08/88 3/16"X 1"W x 1.5"L(11/16!14} .7- 2 7975 7704 24 OTIS-LBD DMY RA 0 03/08/88 1 8279 7983 23 011S-LED DMY RA 0 03/08/88 Estimated TOC at 6,339' MD assumes „-----.. .. .--- 30% 30%washout 8356' —{4-1/2"BKR"L"SLD SLV,D=3.813" 4 Minimum ID =2.377" @ 9983' ' ' 8416' -TIWSBR SEAL ASSY,13= ;r* 3-3/16" X 2-7/8" LNR XO ""4 P" 8431' —19-5/8'X 4-1/2"TNV HBBP PKR,D=3.958" 5 TNV MLLOUT IXTBVSION,D="r —I 8436' y I X 4-1/2"XO,D=3.958" —I 8442' - I I 8460' —I BKR 9-5/8"X 7"LNR HGR&TEBK SLV,ID= , TOP OF 7"LNR — 8460' 8474' —I4-1/2"OTE X NP,D=3.813" III8490' —I3-1/2"BOT DEPLOY SLV,D=3.00" Tubing punch holes will be at 8,400' MD N and the top of cement will provide a �` ri ® 8495• —13 vz"PUPJONT,D=2.867" minimum of a 1,000' lateral barrier. 8506' 4-1/2"OTIS XN NP,MLLEDTO 3.80"(o4/o5/06) ` ,'7-' // BONN )CT LINER '® 8509'_]—I3-1/2"HOVVCO X NP,D=2.813" 4-1/2"TBG,12.6#,L-80 AB-M BUTT, H 8537' ' 8536' H4-1/2"SHEAROUT SUB,D='' LI .0152 bpf,D=3.958" haBEHIND 8537' H 4-1/2"VVLEG,D=3.958" CT LINER 1111 3-1/2"LNR,8.81#,L-80 STL,.0087 bpf,D=2.867" —1 8639' 8640' —I OMD TT LOGGED 04/17/88 9-5/8"CSG,47#,L-80,D=8.681" H 8761' 8539' -13-1/2"X 3-3/16"XO,D=2.786" 9141' H MARKER JOINT ESTIMATED TOP OF CBNBVT —I 9100' kit A4 r r.-4 N,' ho o WINDOW MLLOUT WDOW(C-34A) 9348'-9354' BKR GEN II W-IPSTOCK(04/04/06) 9343' ►+�s� 4 -Ay 0 �,g� 4Qi. X 9372'— 218"WFD EXTENDED RA TAG —I 9353' �•4• 4 4111r • RANGE CBP(02/19/16) RID � \ As a$ 9972'CTM 1.81"WFD EXTENDED 7"LN26#,L-80 U4S,.0383 bpf, =6.276" — r�t�t•��t I 9663' 11111111 111111111111111 �RANGECEP(11/16/14) 11111111. 11111111 9983' 3 3/16"x 2a/s"xo, PERFORATION SUMAARY 11111111 v REF LOG:MCI`L/OCL/GR ON 05/11/06 1�1�1�1�1�1�1�1� / ID=2.377" TEN LOG:GEOLOGY PDC LOG 9983' —FISH-UNKNOWN ANGLEATTOP PERE:91"@ 10060' ./. DEBRIS Note:Refer to Production DB for historical perf data (11/15/14 TAG) 3-3/16"LNR,6.2#,L-80 TCI, H 9983' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ .0076 bpf,ID=2.80" 2" 6 9855-9885 C 11/16/14 2" 6 9900-9930 C 11/16/14 2" 6 9930-9960 C 11/15/14 PBTD —I 11008' 2" 6 10060-11000 C 05/21/06 2-7/8"LNR,6.16#,L-80 STL, 0058 bpf,ID=2.441" —1 11043' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/10/88 N18E ORIGINAL COMPLETION 11/17/14 JGUPJC PE RES/CEP/FISH(11/15-16/14) WELL: C-34A 05/12/06 NORDIC 1 CTD SIDETRACK(C-34A) 03/15/15 DU/PJC TREE CIO PERMT No:'2060370 07/04/06 RDB/PAG MLLED PQR PLUG 02/22/16 CJIWJM)SET CEP(02/19/16) AR No: 50-029-21785-01 12/17/07 RLMPJC DRLG DRAFT CORRECTIONS SEC 19,T11 N,R14E, 1565'FSL&881'FEL 03/13/08 OOB/PJC DRLG DRAFT CORRECTIONS 09/27/14 M3B/PJC PILL RQ PLUG BP Exploration(Alaska) • • PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM 0 ANNULAR BOP: W/(2) 14" UL2 OPERATOR, UPPER CAVITY SHAFFER LXT 13 5/8" 5M AND (2) 14" PSLK W/BSTR OPERATOR, 13-5 8 5M STUDDED TOP LOWER CAVITY / 0 13-5/8" 5M FLANGED BOTTOM 0 ` I I ' DRILLING CROSS: 1 13 5/8"-5M FLANGED TOP J . 0 I 13 5/8"-5M FLANGED BOTTOM 7'• °°°°,O 'O W (2) 3 1/8"-5M SIDE OUTLETS — •• °°o° " f II e ° III - IIIE °°°° r .. r IT----- r li T t KILL LINE: .��I,u� .�I�, 2-1/16" 5M FLEX HOSE -�R�xV� Y it /,I��1 A. Y: Ami �/VQ� F:G \�.� �I 1� F;t�� 2-1/16" 5M X 3-1/8" 5M D.S.A. ������� `�' 3-1/8" 5M FLANGED MANUAL GATE VALVE O ® 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE E • ••.�.�` 0000 Jr. • 3 ■- o o 00 ■ I t I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 13 5/8"- 5M FLANGED BOTTOM 3-1/8" 5M FLEX HOSE w/(2) 14" UL2 OPERATOR • Loepp, Victoria T (DOA) From: Gorham, Bradley M <Bradley.Gorham@bp.com> Sent: Wednesday, May 31, 2017 2:21 PM To: Loepp,Victoria T(DOA) Cc: Oshiro,Joleen;Glasheen, Brian P; Bronga,Jaime Subject: RE: PBU C-34A(PTD 206-037) Plug for Redrill Follow Up Flag: Follow up Flag Status: Flagged Victoria, We are requesting a waiver to abandon the reservoir in this manner: 1. The plug set at 9372'md is set as deep as possible. Debris prevented the plug from being set deeper. 2. The nature of the leak is likely the liner lap at 8490'md. A CMIT-TxIA and a MIT-T passes to 2000 psi.The CMIT- Tx1A fails at 2500 psi with T/IA loss 187/186 psi in 1s`15 min and T/IA lost 103/104 psi in 2nd 15mins for a total of 290/290 psi in 30 mins.The MIT-T fails at 2500psi with Tbg loss of 53 psi in 1st 15min and 45 psi in 2nd 15 min. The IA did not track, a 1000 psi differential was maintained. a. These leak rates indicate a small leak. b. Setting the posiset above the liner lap will isolate the liner lap. A LTP cannot be set due to the restriction in the SSSV nipple at 2157'md. c. A CMIT-TxlA will be performed after the upper cement work is complete verifying the cement and production casing competency before the tubing cut and again after. d. PPPOT-IC passed to 3500 psi e. MIT-OA passed to 1200 psi f. Diagnostics with DHD were performed in Jan and Feb 2016. IA FL and pressure was unchanged during a series of bleeds and monitors,TIO plot. 3. An AOGCC witness can be present for the dump bailing of cement on the CIBP at 9372'md. Let me know if you have any other questions or concerns. Thanks, Brad From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Wednesday, May 31, 2017 9:33 AM To:Gorham, Bradley M<Bradley.Gorham@bp.com> Subject: PBU C-34A(PTD 206-037) Plug for Redrill Brad, Have diagnostics been performed to determine where the leaks are? Can a LTP be set and tested?This plug placement does not meet regulations and would require waiver to abandon the reservoir in this manner. Thanx, Victoria 1 • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsib e 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist�. work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the"Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p~ Q ~ - ©~ ~ Well History File Identifier Organizing (aone> ,,.v,dea oiiuuiuiiuim aesG~~ee~~ iuuiumuuiii RESCAN DIGITAL DATA ~j C or Items: 1 Q Diskettes, No. Greyscale Items: 1 ~~ ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: NOTES: BY: _ Maria ~-.~-_ Project Proofing BY: Maria - r Scanning Preparation BY: Maria _ Production Scanning Stage 1 Page Count from Scanned File: (count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ES NO BY: Maria Date: /~'~ ? /'~ ~ /s/ rM Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO r BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III II'III III II I I III Rescanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III II~III III~III III Date: Date: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: ~mP uiuiiimiwiuu ., om P ~ i` _~_ x 30 = ((J ~ + ~ =TOTAL PAGES /~ /~ ~ (Count does not include cover sheet) Date: /s/ P 10/6/2005 Well History File Cover Page.doc __ • • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 RECEIVED') August 22, 2011 AUG Gag C ec. S� Mr. Tom Maunder 8 Off & G n Alaska Oil and Gas Conservation Commission Anchorage 333 West 7 Avenue Anchorage, Alaska 99501 JO 6-0 37 Subject: Corrosion Inhibitor Treatments of GPB C -Pad � , 3 T n Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) C -Pad 7/19/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010 C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010 C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010 C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010 C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010 C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010 C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010 C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010 C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010 C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010 C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010 C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010 C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010 C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010 C -16B 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011 C -178 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010 C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010 C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010 C -20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010 C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010 C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010 C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011 C -24A 2040580 500292081601 Sealed NA NA NA NA NA C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010 C -26A 1981450 500292083401 0.8 NA 0.6 NA 3.40 11/22/2010 C -278 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010 C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010 C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011 C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010 C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010 C -32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010 C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010 C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010 C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010 C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010 C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010 C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010 C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010 C-41A 2041880 500292238501 Sealed NA NA NA NA NA C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010 ~. ...f "~ . ~ ~~'; ~~ ,' `~i . ~~:4 ~~~ K _• .,,', ~~,,,~., ~~ ~ .,a.., ~ ~, -° ~,. MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ,; WELL L®~ 'a"RA1®TSM~T~'AL, To: State of Alaska July 2, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: C-34A AK-MW-4374649 C-34A: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 50-029-21785-01 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 50-029-21785-01 Digital Log Images: ~~M~p JUL 2 ~ 2008 50-029-21785-01 1 Color Log 1 Color Log 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage,. Alaska 99518 _.__ ~ , .: .:~; Date: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~o~-off ~~~ <3 IaJ,~ DATA SUBMITTAL COMPLIANCE REPORT 6/19/2008 Permit to Drill 2060370 Well Name/No. PRUDHOE BAY UNIT C-34A Operator BP EXPLORATION (ALASKA) INC MD 11043 TVD 9031 Completion Date 5/12/2006 Completion Status 1-OIL Current Status 1-OIL REQUIRED INFORMATION Mud Log No Samples No API No. 50-029-21785-01-00 UIC N Directional Su DATA INFORMATION Types Electric or Other Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Djfectional Survey 0 11043 Open 10/19/2006 D C Las 15518 Gamma Ray 8129 10939 Open 10/3/2007 FNCL, GR, NCNL w/EMF and PDS graphics og 16018 Neutron 5 Blu 8140 11014 Open 3/12/2008 MCNL, GR, CCL, CNL 11- // ~ ~ KED C Lis 16018~/Neutron 8130 10927 Open 3/13/2008 May-2006 LIS Veri, GR, CNT ', Rpt LIS Verification 9325 11044 Open 5/19/2008 LIS Veri, GR, ROP, RPX, FET, RPM, RPD, RPS I iED C Lis 16259~r~fnduction/Resistivity 9325 11044 Open 5/19/2008 LIS Veri, GR, ROP, RPX, ', FET, RPM, RPD, RPS Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y / (~~J\ Chips Received? S~/ N- ~ Analysis l ' TriV Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~/ N Formation Tops • Comments: DATA SUBMITTAL COMPLIANCE REPORT 6/19/2008 Permit to Drill 2060370 Well Name/No. PRUDHOE BAY UNIT C-34A MD 11043 TVD 9031 ompletion Date 5/12/2006 Compliance Reviewed By: __________.... Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21785-01-00 Completion Status 1-OIL Current Status 1-OILI Q UIC N Date: 1 L ~ ~~ ~ ~ l~ i s ~ WELL LOG TRANSMITTAL To: State of Alaska April 30, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data: C-34A REDO AK-MW-4374649 1 LDWG formatted CD rom with verification listing. API#: 50-029-21785-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~. -, ~ ~~~ ~ ~ _ , j ~-~ ~ ~~:, Date: a , J~~ia BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 ~'i / j~ ~I Signed: ~OCo -03``~ f ~o~ j ~/ 03/12/08 ~~~~~~~61-~~i- NO.4629 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell street, suite aoo Alaska Oil & Gas Cons Comm anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Endicott ~ni..u hN u Inn flnc infirm rlafw RI Cnlnr CD C-176 12031461 USIT 4t 03/09/08 1 1 1-67/T-20 12014001 USIT - L ~ 03/09/08 1 1 E-216 11661157 MCNL ~' ~' 06/19/07 1 1 02-35B 11216177 MCNL ~ 02/09/06 1 1 C-34A 11216194 MCNL ~ / Q(~f 05/11/06 1 1 G-08A 11628761 MCNL ~ * 05/11/07 1 1 04-O1A 11661146 MCNL 05/15/07 1 1 F'LtA~t AGKNUWLtUtdt MtlaiF'1 t3Y ~IIiNINIa ANU Ht I UfiNINl9 VNt I.VYT tHl.r1 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 -, fi . 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: - Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth Received by: s r~ Date 09-28-2007 Transmittal Number:92905 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) :f you have any questions, please contact Douglas Dortch at the YllC; at 564-4N /~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wefts: 02-35B ~OCo'vba ~ ISSrS 07-07B BUG -O`61 ~ i.551 ~ aF L '~- C-16B~bC~-dS~ L55 D-o76aaS-6~l `~ I E-21 B c~C3 5 /~~- *15~a' 1 G-06A 2b Co -Ufa ~ l~"S-~a G-10C o~0(o-pp°I '~ tSia3 r~ Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 • r~ L~ 16-Jun-06 AOGCC Ceresa Tolley 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well C-34A Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 9,317.60' MD Window /Kickoff Survey: 11,011.22' MD (if applicable) Projected Survey: 11,043.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ~ ~ A ~, A ~l i Date (. 4~; ~ ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) ~O~~V~~ ~~ 7//a/~ ~ C~ C 1 V C V .. ` ~ STATE OF ALASKA ~ JUL 4 6 2006 ALAS IL AND GAS CONSERVATION CO ~ SION ka Oii & Gas Cons. Co-rxnission WELL COMPLETION OR RECOMPLETION REPORT AND L~~ Anchorage R®vised 07105/Q6; Put an Production 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.,os zoAAC zs.,1o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 5/12/2006 12. Permit to Drill Number 206-037 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 5/7/2006 13. API Number 50-029-21785-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/10/2006 14. Well Name and Number: PBU C-34A 1565 FNL, 882 FEL, SEC. 19, T11 N, R14E, UM Top of Productive Horizon: 763' FNL, 922' FWL, SEC. 20, T11 N, R14E, UM g. KB Elevation (ft): 67.51' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 1836' FNL, 214' FWL, SEC. 20, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD) 11008 + 9032 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664504 y- 5959657 Zone- ASP4 10. Total Depth (MD+TVD) 11043 + 9031 Ft 16. Property Designation: ADL 028305 TPI: x- 666286 y- 5960498 Zone- ASP4 Total Depth: x- 665605 Y- 5959410 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: ff h 19 W h if Thi k f P f t 20 18. Directional Survey ®Yes ^ No ore . ater dept , o s N/A MSL ness o ros c erma . 1900' (Approx.) 21. Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, MGR / CCL / CNL 2. ASING, LINER AND EMENTING ECORD CASING ETTING EPTH MD : ' ETTING EPTH TVD HOLE OUNT SIZE WT. PER FT. GRADE QP OTTOM OP OTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu ds Concrete 13-3/8" 68# L-80 Surface 2685' Surface 2685' 17-1/2" 3723 cu ft Arcticset 9-5/8" 47# L-80 Surface 8762' Surface 8410' 12-1/4" 1206 cu ft Class'G', 575 cu ft'G' 7" 26# L-80 8460' 9348' 8147' 8906' 8-1/2" 414 cu ft Class'G' s-1iz" x 3-3/16" x zais" 8.81# 162#! 6.16# L-80 8490' 11043' 8173' 9031' 4-118" 174 cu ft Class 'G' 23. Perforations open,to Production (MD +TVD of Top and " " 24. TUBING RECORD Bottom Interval, Slze and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 6 spf 5-1/2", 17#, L-80 x 2491' MD TVD MD TVD 4-1/2", 12.6#, L-80 2491' - 8536' 8431' 10060' - 11000' 9029' - 9033' '25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT 8c KIND OF MATERIAL USED 2500' Freeze Protect w/ 38 Bbls of McOH 26• PRODUCTION TEST Date First Production: July 4, 2006 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date of Test 7/5/2006 Hours Tested 4 PRODUCTION FOR TEST PERIOD • OIL-BBL 853 GAS-MCF 1,184 WATER-BBL 9 CHOKE SIZE 94° GAS-OIL RATIO 1,389 Flow Tubing Press. 20 Casing Pressure 1,300 CALCULATED 24-HOUR RATE OIL-BBL 5,115 GAS-MCF 7,103 WATER-BBL 55 OIL GRAVITY-API (CORK) 26.8 27. GORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None Form 10-407 Revised 12/2003 ~ 1 ~ ~ ~ ~ ~N INUED ON REVERSE SIDE 28' GEOLOGIC MARKS 29' ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 2A/ 21TS 9408' 8952' None Zone 1 B 9558' 9028' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed i t Date ~~ ~S/O( T h i l A t ~ Titl an p e n s ec ca ss Terrie Hubble PBU C-34A 206-037 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. onuing engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITena 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: True vertical thickness. hEn~ 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. h-eM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). trena 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). h-eM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only • • Well: C-34A Accept: 05/05/06 Field: Prudhoe Bay Unit .Spud: 05/07/06 API: 50-029-21785-01 Release: 05/12/06 Permit: 206-037 Riq: Nordic #1 POST RIG WORK 05/22/06 SET 4'h" SSCS AT 5,207' SLM. PULLED DGLV IN STA# 4 AT 5,065' SLM. ATTEMPTED TO PULL DGLV IN STA# 3 AT 3,079' SLM. 05/23/06 PULLED 1 1/2" DGLV FROM STA# 5 AT 3,069' SLM. SET 1 1/2" LGLV WITH RM LATCH (1/4" PORTS, 1,500 PSI TRO) IN STA# 5 AT 3,071' SLM. SET 1 1/2" OGLV WITH RM LATCH (5/16" ORIFICE) IN STA# 4 AT 5,067' SLM. PULLED SSCS AT 5,207' SLM. RDMO. BRUSHED "X" NIPPLE AT 8,433' W LM, TAGGED DEPLOYMENT SLEEVE AT 8,446' SLM. SET 4 1/2" XX PLUG BODY (WITH 4 (3/16" HOLES) AT 8,447' SLM. RAN CHECK-SET AND VERIFIED LOCK WAS SHUT ALL THE WAY. IN THE PROCESS OF PUMPING FOR MIT-T. 05/24/06 PULLED 4 1/2" XX TTP PLUG, SET 5 1/2" PRQ PLUG AND PRONG IN SSSV AT 2129' SLM (PRONG OAL=96", 2.765 CENT 2" BELOW 1.75" FN, 4 3/16 PORTS), UNABLE TO GET MIT-T ON FIRST ATTEMPT, PULLED REDRESSED AND RESET PRONG, ATTEMPTED TO MIT-T AGAIN, PRESSURED UP TO 1800 PSI, THEN PRESS SLOWLY BLEEDS DOWN, C/L AND B/L LINE TRACKING TBG, BLED TBG BACK TO 0 PSI. 05/30/06 PULLED PRONG AT 2127' SLM MADE SEVERAL ATTEMPTS TO PULL 5 1/2 PRQ PLUG BODY W/ NO SUCCESS, METAL SLIVERS ON DOGS OF GS. LOOKS LIKE FISHING NECK IS STRIPPING OUT. UNABLE TO FIND PROPER RELEASABLE SPEAR, WILL HAVE ONE MADE AND RETURN AT LATER DATE TO PULL PLUG BODY. 06/02/06 SET RELEASABLE SPEAR IN 5 1/2 PRQ PLUG BODY AT 2129' SLM CURRENTLY ATTEMPTING TO PULL PLUG BODY 06/03/06 JARRED ON FISH FOR APPROX 6 HRS AT 1800#, NO MOVEMENT. 06/04/06 UNABLE TO PULL PLUG BODY W/ .125 WIRE, RIGGED UP BRAIDED LINE, PULLED 5 1/2" FISHING NECK AND EXPANDER MANDREL OFF OF LOCK. 06/05/06 TAGGED FISH W/ 4.50 LIB (NO IMPRESSION), SET 5 1/2" G F.N (17" OAL) ON TOP OF PLUG BODY TO GUIDE BAILER INTO PACKING MANDREL, BAILING WHAT APPEARS TO BE PLASTIC COATING FROM THE TUBING FROM PLUG BODY, WORKED BAILER FROM 2127' SLM - 2132' SLM. NO INDICATION PLUG HAS EQUALIZED. 06/06/06 BAILED PLASTIC COATED TBG FROM INSIDE PLUG BODY, FINALLY GOT PLUG EQUALIZED WAS ABLE TO PUMP THRU PLUG, PULLED 5.5" G-F.N GUIDE, SET RELEASABLE SPEAR AT 2126' SLM, JARRED 15 MIN, QUICK CONNECT BELOW SPANGS DISCONNECTED FROM TOOLSTRING. UNABLE TO CONT WORK ON WELL DUE TO LEAKING SWAB VLV, STANDING BY FOR VLV CREW TO REBUILD SWAB. C-34A, Work Performed Post D~j of Sidetrack • Page 2 06/07/06 DECISION MADE TO RIG DOWN, WILL RETURN LATER WHEN SWAB VLV IS FIXED. RIG DOWN B/L EQUIP. FISH LEFT IN HOLE, 2 1/2" MALE QC , 4.50 CENT, 2' 1 7/8" STEM AND 3 1/2" GS, LATCHED UP TO RELEASABLE SPEAR (OAL OF SPEAR IS 32") SET IN PKG MANDREL OF 5 1/2" PLUG BODY AT 2126' SLM (OAL LENGTH OF PLUG BODY IS APPROX 76" ), RETRIEVE RELEASABLE SPEAR W/ 4 1/2" GS. RDMO. 06/11/06 PULLED FISH AND RELEASEABLE SPEAR AT 2,124' SLM. ATTEMPTED TO RE-PLANT SPEAR, GOT (8) GOOD LICKS, SPEAR SLIPPED OUT. MADE 2 BAILER RUNS, BOTH CAME BACK W/ NO RETURNS. SOLID DOWN LICKS, APPEARS WE KNOCKED SOMETHING LOOSE. WELL WANTS TO FLOW NOW, ALL VALVES NOT HOLDING, WILL HAVE THE SWAB VALVE REBUILT. RESEARCHED, THIS WELL HAS A GAS LIFT DESIGN INSTALLED. UNABLE TO DO REPAIRS ON SWAB VALVE DUE TO LEAKING MASTER VALVE. RDMO. 5 1/2" PLUG BODY STILL IN SSSVN, WITH MISSING FISHING NECK AND EXPANDER MANDREL. 06/14/06 DRIFT W/ 5.5 GS. PULLED 5.5 G- FISHING NECK AT 2132' (SLM). SET 5.5 WRP AT 1866' SLM. (1888' CORR. MD) DRAW DN. TBG. T / IA / OA = 0 / 200 / 200. WELL LEFT S/I. 06/23/06 RAN 4.50 GAUGE RING, DOWN TO 1840 SLM. RAN 4 1/2 GR, W/WRP PULLING TOOL, SAT DOWN AT 1863' SLM. JARRED UP FEW TIMES, SHEARED TOOL RAN 4 1/2 GS, SAT DOWN AT 1860 SLM. LATCHED AND PULLED W RP PLUG, ALL ELEMENT REC. SET RELEASABLE SPEAR AT 2131' SLM. JAR ON FISH W/ 3.5" GS, KEEP SLIPPING OUT OF PACKING MANDREL. 06/24/06 RAN 3.5 GR W/ RELEASEABLE SPEAR, SET AT 2130' SLM. MADE 4 ATTEMPS W/ 3 1/2 GS, AT 2130' SM. NO LUCK., RAN 4 1/2 GS, SAT DOWN AT 2130' SLM. JARRED UP 30 MIN, PULLED SPEAR BACK OUT, 4 PIECES OF SPEAR GRAB BROKE OFF. SET NON RELEASABLE SPEAR AT 2131' SLM. 06/25/06 SET AND PULLED TWC, ON 6/21/06 SET TWC. HIT SOMETHING AT 90" ROTATED TO THE RIGHT AND WENT ON DOWN AND SET THE TWC. THE TREE WAS THEN SWAPPED OUT. TRIED TO PULL THE TWC BUT UNABLE TO GET THE PLUG TO TRAVEL MORE THAN 18". ABLE TO GO BACK DOWN AFTER TRYING SEVERAL DIFFERENT TIMES. LEFT THE PLUG IN THE HOLE AND RIGGED DOWN THE LUBRICATOR. WENT BACK OUT THAT NIGHT AND WAS ABLE TO PULL THE TWC OUT OF THE HOLE ,THE BOBY SEAL WAS REALLY TORE UP ,AND ALSO THE BODY OF THE TWC HAD 2 DEEP SCRATCHES ON IT. JAR ON 5.5" RQP PLUG W/O FN AND EXP MANDREL W/ NON RELEASABLE SPEAR AT 2131' SLM. RIGGED UP B/L EQUIP, JARRED ON FISH FOR 4.5 HRS AT 3500-4000#, NO MOVEMENT. 06/26/06 JARRED ON FISH APPROX 13 HRS AT 3500- 4000#, NO MOVEMENT. 06/27/06 JARRED ON FISH APPROX 3 1/2 HRS AT 3500-4000#, UNABLE TO PULL, NO MOVEMENT. WELL LEFT S/I. 06/29/06 RIH AND JAR ON FISH, 60 JAR LICKS AT 30K. NO MOVEMENT OF FISH. POOH FOR PIPE MANAGEMENT AND NEW JARS/MHA. 06/30/06 ENGAGE FISH. JAR UP 21.5K OVER 60 TIMES. NO MOVEMENT. POOH FOR AGITATOR TOOL AND NEW MHA. RIH W ITH BHA #2 W/AGITATOR TOOL. ENGAGED FISH AND AGITATED INTENSION AT 5K, 10K, 15K AND 2K OVERPULLS AND IN COMPRESSION WITH 6K AND 8K DOWN WEIGHT. AGITATED FOR 2 HOURS TOTAL TIME WITH NO MOVEMENT. POOH FOR VENTURI JUNK BASKET. RIH W/BHA #3 W/ VENTURI JUNK BASKET. VENTURI BASKET CAME BACK WITH SMALL AMOUNT OF PLASTIC COATING AND OIL COVERED. MU BHA #1 AGAIN WITH SET OF DAILY BI-DIRECTION JARS. JAR 54 TIMES DOWN AND 16 TIMES UP WITH NO MOVEMENT. POOH. MU BHA #1 WITH NEW COIL CONNECTOR AND JARS. RIH. PUMP 140°F WATER. C-34A, Work Performed Post D~ of Sidetrack • Page 3 o7ioi /06 FISH. JAR 23 TIMES AT 32K UP WEIGHT (25K OVERPULL). PULLED FREE. POOH. BAKER DISCONNECT PARTED ON FISHING STRING. STANDBY WHILE SLICKLINE FISHED DISCONNECT INNER MANDREL. MU BHA #3 VENTURI JUNK BASKET AND RIH. RECOVERED ONLY 1/2 CUP PLASTIC COATING FROM TUBULARS. RIH W/BHA #5 BOX TAP FISHING STRING TO LATCH CT FISH. 07/02/06 CONTINUE FISHING WITH 4.5" BOX TAP. NO SUCCESS. RIH WITH HIPPTRIPPER AND 4.5" BOX TAP. PUMPED FROM 0.9 TO 1.7 BPM RUNNING HIPPTRIPPER POOH. RECOVERED REMAINDER OF CT TOOLS LOST WITH ALL PARTS ACCOUNTED FOR. RIH WITH RH MOTOR AND WEATHERFORD TAPER TAP. ATTEMPT TO ENGAGE BAIT SUB MULTIPLE TIMES WITH NO SUCCESS. POOH. AT SURFACE, SOME ROLLED TEETH AND RADIAL MARKS SEEN ACROSS BOTTOM OF TOOL. INSTALL 4.5" STABILIZER BELOW MOTOR. RIH AND TRIED TO LATCH WITHOUT SUCCESS. JARRED DOWN ONCE WITHOUT SUCCESS. POOH. NO OBVIOUS MARKS SEEN ON TOOL. DECISION MADE TO RUN BOX TAP TO LATCH BAIT SUB. RIH WITH MOTOR AND BOX TAP. ENGAGE FISH AND BEGIN FISHING. 07/03/06 CONTINUE FISHING ON SPEAR. PULL OFF FISH TO MANAGE PIPE (3 JAR LICKS UP AT 12K TO GET OFF) POOH. MAKE UP NEW BHA. RIH TO FISH. PULL OFF FISH (3 JAR LICKS UP AT 14K). POOH. RIH W/GS SPEAR. JARRED UP 1X AND POOH W ITH SPEAR. MAKE UP VENTURI JUNK BASKET AND RIH. RECOVER ABOUT 1/2 CUP OF PLASTIC COATED TUBING. MAKE UP LEFT HANDED BHA. RIH W/BHA #14 WITH A 2.32" PARABOLIC MILL AND 4.5" CENTRALIZER. DRY TAG AT 2159.4' CTM. BEGIN MILLING AT 1.8 BPM. 07/04/06 CONTINUE MILLING ON PLUG AT 2160'. MILL THROUGH, NO GO AT 2163'. BACK REAM 2157' TO 2163'. DRY DRIFT. FREEZE PROTECT TUBING WITH 50/50 METHANOL. POOH. RDMO. MILL FIELD GAUGED AT 2.31 ". SECURE W ELL, NOTIFY PAD OPERATOR OF W ELL STATUS /ISSUES. OPERATOR TO POP. JOB COMPLETE. STATE OF ALASKA ALASK~IL AND GAS CONSERVATION CO ~ SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG I~EGEIVEE} JUN 0 g 2006 Alaska Oil & Gas Cons. Corrxr~ssiort 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG 2oAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 5/12/2006 12. Permit to Drill Number 206-037 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 5/7/2006 13. API Number 50-029-21785-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/10/2006 14. Well Name and Number: PBU C-34A 1565 FNL, 882 FEL, SEC. 19, T11N, R14E, UM Top of Productive Horizon: 763' FNL, 922' FWL, SEC. 20, T11N, R14E, UM g. KB Elevation (ft): 67.51' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 1836' FNL, 214' FWL, SEC. 20, T11N, R14E, UM 9. Plug Back Depth (MD+TVD) 11008 + 9032 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664504 y- 5959657 Zone- ASP4 10. Total Depth (MD+TVD) 11043 + 9031 Ft 16. Property Designation: ADL 028305 TPI: x- 666286 y- 5960498 Zone- ASP4 Total Depth: x- 665605 Y- 5959410 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: if ff h 1 W d th f P mafrost 20 Thi k 18. Directional Survey ®Yes ^ No ore ater ep , o s 9. N/A MSL er . ness o c 1900' (Approx.) 21. Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, MGR / CCL / CNL ASING, INER AND EMENTING ECORD CASING ETTING' EPTH MD ' ETTING ' EPTH TVD HOLE MOUNT SIZE WT. PER FT. GRADE Op OTTOM OP TTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu ds Concrete 13-3/8" 68# L-80 Surface 2685' Surface 2685' 17-1/2" 3723 cu ft Arcticset 9-5/8" 47# L-80 Surface 8762' Surface 8410' 12-1 /4" 1206 cu ft Class'G', 575 cu ft'G' 7" 26# L-80 8460' 9348' 8147' 8906' 8-1/2" 414 cu ft Class'G' a-, it x 3-3116" X z-~is• a.a,u r s.za i s., sa L-80 8490' 11043' 8173' 9031' 4-1 /8" 174 cu ft Class 'G' 23. Perforations open to Production (MD +TVD of Top and " " 24. TuawG RECORD Bottom Interval, Size and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 6 spf 5-1/2", 17#, L-80 x 2491' MD TVD MD TVD 4-1/2", 12.6#, L-80 2491' - 8536' 8431' 10060' - 11000' 9029' - 9033' 25. ACID, FRACTURE, CEMI_NT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED 2500' Freeze Protect uv/ 38 Bbls of McOH 26• PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test Hours Tested PRODUCTION FOR TEST PERIOD OIL-BBL GAS-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing PreSS. Casing Pressure CALCULATED 24HOUR RATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API (CORK) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". ~ ~ p~~~ None CO?o1r LE'fl(k~t ~.~,~ o ~ ~p ~~-.~ l ~ ~ ~ ~~ ~,~y ~ ~ 2 v Il=im ~1S RFI~ JUN 14 2006 Form 10-407 Revised 12/2003 ~ 6 ^ ~ ~~pI.IT UED ON REVERSE SIDE ~• 1{t ,{~-1^`~ /((il] ~ (vim 28. GEOLOGIC MARKE 29' ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 2A/ 21TS 9408' 8952' None Zone 1 B 9558' 9028' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. r(~/ Signed l A i t Date ~ v Titl T h i t d ~~ an ec n ca ss s e / Terrie Hubble. PBU C-34A 206-037 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. DrrUing Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GenlerzA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: ff no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION Operations Summary Report Page 1 of 8 Legal Well Common W Event Nam Contractor Rig Name: Date i Name: ell Name: e: Name: From - To C-34 C-34 REENTE NORDIC NORDIC Hours R+COM CALIS 1 Task ; PLET TA Code E NPT ! Start Rig Rig Phase Spud Date: 2/22/1988 : 4/7/2006 End: 5/12/2006 Release: 5/12/2006 Number: Description of Operations 5/4/2006 10:00 - 10:30 0.50 MOB P PRE Rig released from NK-14A ~ 10:OOHrs on 5/4/2006. Prep to move rig off well. 10:30 - 12:00 1.50 MOB P PRE PJSM. Jack-up rig & pull rig off well. Conduct post-operations pad inspection. 12:00 - 13:30 1.50 MOB P PRE PJSM. Hang off BOPs on pad eyes below rig floor. Scope down derrick. 13:30 - 14:00 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 14:00 - 17:00 3.00 MOB P PRE Move rig from NK-pad to L5-pad. Had to move @ +/-0.5mph due to faulty drive system hydraulics. 17:00 - 20:00 3.00 MOB N RREP PRE Troubleshoot & repair faulty drive system hydraulics. 20:00 - 00:00 4.00 MOB P PRE Continue moving rig to C-34 @ almost normal speed. 5/5/2006 00:00 - 06:00 6.00 MOB P PRE Continue moving rig to C-34. Currently at west guard shack on spine road. 06:00 - 13:30 7.50 MOB P PRE Move rig to C pad and position rig in front of well. 13:30 - 13:45 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for scoping up derrick. 13:45 - 15:15 1.50 MOB P PRE Scope up derrick and secure guy wires. 15:15 - 15:30 0.25 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for backing over well. Well is dead and afl valves are closed. 15:30 - 16:00 0.50 MOB P PRE Back over well. 16:00 - 17:30 1.50 RIGU P PRE ACCEPT RIG AT 16:00 HRS, 05/05/2006. Spot trailers and tanks, general rig up. 17:30 - 18:30 1.00 BOPSU P PRE Nipple up BOPE. 18:30 - 00:00 5.50 BOPSU P PRE Grease tree valves & perform initial BOPE pressure & function test. AOGCC test witness waived by Jeff Jones. BOP test witnessed by BP WSL, John Egbejimba. Had to replace test pump hose & transducer. Also had to wait 1 hr for rig water truck which was temporary barred from entering pad due to hi-pressures on C-06. 5/6/2006 00:00 - 02:00 2.00 BOPSU P PRE Continue PlTesting BOPE. Meanwhile fill rig pits with 2ppb bio-KCL fluid. R/U hardline to tiger tank & PT to 4000psi. 02:00 - 02:15 0.25 STW HIP P WEXIT Open up well & observe 0 psi WHP (on vac). IAP = 34psi & OAP = 20psi. 02:15 - 02:30 0.25 STWHIP P WEXIT Changeout stripper packoffs. 02:30 - 03:00 0.50 STWHIP P WEXIT Install Baker CTC. Pull test to 35k - OK. 03:00 - 04:45 1.75 STWHIP P WEXIT Install dart catcher. Load wiper dart. Launch & chase with 2% KCL. Pump 75bbls & did not observe dart hit. Recover dart. Press test inner reel valve &CTC to 3500psi - OK. 04:45 - 05:15 0.50 STWHIP P WEXIT PJSM. M/U window milling BHA #1 with a 3.80" HC DP0261 DWM, 3.79" diamond string reamer, Baker Xtreme motor, MHA & 2 jts of PH6 tbg (OAL - 84.66'). M/U injector. 05:15 - 07:45 2.50 STWHIP P WEXIT RIH window milling BHA #1 taking diesel FP fluid to tiger tank. Down wt = 21 K at 9300'. 07:45 - 09:30 1.75 STWHIP P WEXIT Tag cement at 9352'. Mill cement to pinch point at 9,355.2', Correct depth to pinch point depth of 9347', [-10.2' CTDJ, Top of whipstock at 9343'. Top of window at 9,347'. RA tag at 9353'. Mill 3.80" window thru 7", 26# liner. 2.6 bpm, 1700 psi, 1 FPH, 2 K WOB. Milled to 9349'. Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Operations Summary Report Page 2 of 8 Legal Well Common W Event Nam Contractor Rig Name: Date ; Name: ell Name: e: Name: From - To C-34 C-34 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task ~ PLET A Code E NPT Start Rig Rig Phase ~ Spud Date: 2/22/1988 : 4/7/2006 End: 5/12/2006 Release: 5/12/2006. Number: Description of Operations 5/6/2006 09:30 - 11:30 2.00 STWHIP P WEXIT Milled 3.80" window thru 7" liner, 2.6 bpm, 1700-1900 psi, 3-4K WOB, 1 FPH. Milled to 9,351'. 11:30 - 14:00 2.50 STWHIP P WEXIT Milled 3.80" window thru 7" liner, 2.6 bpm, 1700-1900 psi, 3-4K WOB, 1 FPH. Milled to 9,353'. 14:00 - 15:15 1.25 STWHIP P WEXIT Milled 3.80" window thru 7" liner, 2.6 bpm, 1700-1900 psi, 3-4K WOB, 1 FPH. Milled to 9,354'. Exit liner at 9,354'. 7' long window. TF = 12 deg. ROHS. 15:15 - 16:15 1.00 STWHIP P WEXIT Milled 10' of formation, 2.6 bpm, 1650-1900 psi, Milled to 9,364'. 16:15 - 17:30 1.25 STWHIP P WEXIT Backream up thru window to 9340'. Ream down clean to 9364'. Swap to FloPro. Backream clean up thru window. Ream down clean. Ream up clean, up wt = 34K, Dry tag OK. Tentative window depths are: TOWS = 9343', TOW = 9347.6', BOW = 9354', RA PIP Tag = 9353'. 17:30 - 18:50 1.33 STWHIP P WEXIT POH with milling BHA while circulating FloPro. Flag Coil at 9200' EOP. POH. 18:50 - 19:15 0.42 STWHIP P WEXIT OOH. PJSM. S/B injector. UD BHA #1 & inspect mills. Window mill gauge 3.80" go / 3.79" no-go & string mill gauge 3.79" go / 3.78" no-go. Wear on window mill face indicates center crossed the liner wall. 19:15 - 19:30 0.25 DRILL P PROD1 Held pre-spud safety meeting. Reviewed well plan, potential hazards & drilling BHA M/U procedures. 19:30 - 20:15 0.75 DRILL P PROD1 M/U drilling BHA #2 with 3.2deg X-treme motor, MWD/GR, orienter & rebuilt Hughes 3-3/4" x 4-1/8" RW D2ST bicenter bit #2. Scribe tools & M/U injector. 20:15 - 21:30 1.25 DRILL P PROD1 Rehead & install SLB CTC. Pull test to 35k & P/test to 3500psi OK. Meanwhile P/test rebuilt Nordic Pump#2 valve seat to 4500psi - OK. 21:30 - 22:30 1.00 DRILL N RREP PROD1 Troubleshoot & fix faulty SLB mechanical depth counter. 22:30 - 00:00 1.50 DRILL P PROD1 RIH drilling BHA#2. SHT MWD & orienter ~ 5500' - OK. Function test Pump#2 trip set - OK. 5/7/2006 00:00 - 00:40 0.67 DRILL P PROD1 Continue RIH. Correct CTD by -12' C~? the 9200' EOP flag. 00:40 - 00:45 0.08 DRILL P PROD1 Orient TF to HS. 00:45 - 00:50 0.08 DRILL P PROD1 RIH clean thru window with pumps down. Tag btm without pumps @ 9364'. Bring on pumps & establish freespin ~ 2.65bpm/2900psi. TF = 10R. Up wt = 32k, Run-in wt = 20k. PVT = 298bb1s. 00:50 - 00:55 0.08 DRILL P PROD1 Orient TF to 30R. 00:55 - 01:45 0.83 DRILL P PROD1 Start drilling build/turn. Drill to 9379' with 40-60R TF, 2.65/2.65bpm 2900/3050psi, 4k WOB & 20fph ave ROP. PVT = 248bb1s -Lost 40bbls of mud over the shakers in 1 hour. C/O shaker screens from 250 to 175 mesh screen. 01:45 - 02:30 0.75 DRILL P PROD1 Orient & drill to 9390' with 60R TF, 2.65/2.65bpm 2900/3150psi, 2k WOB & 20fph ave ROP. 02:30 - 03:35 1.08 DRILL P PROD1 Orient & drill to 9431' with 90-95R TF, 2.65/2.65bpm 2900/3250psi, 2k WOB & 40fph ave ROP. 03:35 - 04:00 0.42 DRILL P PROD1 PUH above window to 9320' for GR tie-in log. 04:00 - 04:25 0.42 DRILL N DFAL PROD1 Attempt to log up GR & observe no pulses from MWD. PUH to 9290' & attempt to log down ~ still not getting pulses. 04:25 - 04:35 0.17 DRILL N DFAL PROD1 RBIH to btm & observe intermittent MWD pulses. 04:35 - 04:45 0.17 DRILL P PROD1 Drill to 9436' with intermittent MW D pulses -suspect weak pulser. Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Operations Summary Report Page 3 of 8 Legal Well Name: C-34 Common Well Name: C-34 Spud Date: 2/22/1988 Event Name: REENTER+COMPLETE Start: 4/7/2006 End: 5/12/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/12/2006 Rig Name: NORDIC 1 Rig Number: Date From - To ~ Hours Task Code NPT Phase Description of Operations 5/7/2006 04:45 - 05:00 0.25 DRILL N DFAL PRODi Switch mud pumps & still do not have steady MWD pulses. Decide to POOH for MWD pulser. 05:00 - 06:30 1.50 DRILL N DFAL PROD1 POOH drilling BHA#2. Meanwhile C/O shaker screens from 175 to 250 mesh screen. 06:30 - 08:00 1.50 DRILL N DFAL PROD1 L/O BHA, found bit was fully ringed, call trip a bit trip, M/U HYC BC Bit #3, C/O Sperry probe, M/U CTC. 08:00 - 09:30 1.50 DRILL N DFAL PROD1 RIH with MW D Build BHA #3 with 3.2 deg motor and HYC BC bit. OAL = 67.1'. SHT OK, continue to RIH. 09:30 - 09:50 0.33 DRILL N DFAL PROD1 Orient TF to 30R. 09:50 - 10:15 0.42 DRILL P PROD1 RIH thru window, OK. Log GR tie-in. [-9' CTDj. 10:15 - 11:15 1.00 DRILL P PROD1 Orient TF around to get 30R TF. 11:15 - 12:45 1.50 DRILL P PROD1 Drill build section, 2.6 2.6 bpm, 2900-3500 psi, 32R, 50 deg incl, Drilled to 9488'. 12:45 - 13:00 0.25 DRILL P PROD1 Orient TF around to get 30R TF. 13:00 - 13:20 0.33 DRILL P PROD1 Drill build section, 2.6 2.6 bpm, 2900-3500 psi, 70R, 61 deg incl, TF keeps rolling to the right. Drilled to 9511'. 13:20 - 13:50 0.50 DRILL P PROD1 Orient TF around to get 30R TF. 13:50 - 14:30 0.67 DRILL P PROD1 Drill build section, 2.6 2.6 bpm, 2900-3500 psi, 70R, 63 deg incl, Drilled to 9538'. 14:30 - 14:45 0.25 DRILL P PRODi Wiper trip to window. Clean hole. 14:45 - 14:55 0.17 DRILL P PROD1 Log GR, tie-in RA tag with original hole GR. RA was on depth with tie-in log at 9,353'. 14:55 - 16:00 1.08 DRILL P PROD1 Drill build section, 2.6 2.6 bpm, 2900-3500 psi, 50R, 70 deg incl, Drilled to 9,559'. 16:00 - 16:40 0.67 DRILL P PROD1 Drill build section, 2.6 2.6 bpm, 2900-3500 psi, 90R, 77 deg incl, Drilled to 9,594'. 16:40 - 17:15 0.58 DRILL P PROD1 Orient TF around to get 30R TF again. Wiper trip to window while orienting. 17:15 - 18:00 0.75 DRILL P PROD1 Drill & land build section ~ 9642' (+/-8972'ssvd) and ROP fell to zero. Stacking WT, very little motor wt. 15K WOB, 86 deg incl, 18:00 - 19:30 1.50 DRILL P PROD1 POH for bit. Bit appears worn out from drilling chert. Geo is seeing tar & up to 15% chert in BUS. 19:30 - 20:00 0.50 DRILL P PROD1 OOH. PJSM. S/B injector. L/D BHA#3. Check bit - OK, grade 1/2/I (must have been balled). Check motor, MWD pulser, orienter & MHA - OK. Reset motor bend to 2degs & scribe tools. 20:00 - 20:15 0.25 DRILL P PROD1 PJSM for cutting CT. 20:15 - 21:15 1.00 DRILL P PROD1 R/U hydraulic cutter & cut 500' of CT. 21:15 - 21:45 0.50 DRILL P PROD1 Rehead & install SLB CTC. Pull test to 35k & P/test to 3500psi OK. 21:45 - 22:15 0.50 DRILL P PROD1 M/U drilling BHA #4 with 2degs X-treme motor, MWD/GR, orienter & rerun Hycalog 3-3/4" x 4-1 /4" DS3611 M bicenter bit #4. M/U injector. 22:15 - 00:00 1.75 DRILL P PROD1 RIH drilling BHA#4. SHT MWD & orienter ~ 5500' - OK. RIH clean thru window to 9395' with pumps down. 5/8/2006 00:00 - 00:10 0.17 DRILL P PROD1 Log up GR & tie into RA pip tag -Subtract 10' from CTD. 00:10 - 00:30 0.33 DRILL P PROD1 RIH & tag btm ~ 9640'. 00:30 - 02:15 1.75 DRILL N DFAL PROD1 Attempt to orient on btm -not getting clicks. PUH to 9380' & orient without luck. PUH into window & orient TF to 70R. RBIH to btm & TF flop to 115R. Repeat process & TF flop again. PBUH to 9380'. Orient to 40R. RBIH to btm &MWD start Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Operations Summary Report Page 4 of 8 Legal Well Name: C-34 Common Well Name: C-34 Spud Date: 2/22/1988 Event Name: REENTER+COMPLETE Start: 4/7/2006 End: 5/12/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/12/2006 Rig Name: NORDIC 1 Rig Number: Date ;From - To j Hours j Task Code NPT Phase Description of Operations ~_ __ _~ 5/8/2006 00:30 - 02:15 1.75 DRILL N DFAL PROD1 pulsing intermittently. 02:15 - 02:30 0.25 DRILL N DFAL PRODi PUH above window. 02:30 - 02:45 0.25 DRILL N DFAL PRODi Troubleshoot MWD & get back pulses. 02:45 - 02:55 0.17 DRILL N DFAL PRODi RBIH to btm with 55R TF. 02:55 - 03:15 0.33 DRILL P PROD1 Drill to 9673' with 45R TF, 2.65/2.65bpm 2900/3300psi, 3k WOB & 75fph ave ROP. 03:15 - 03:25 0.17 DRILL P PROD1 Orient TF to 75R ~ btm -got 10degs clicks. 03:25 - 03:35 0.17 DRILL P PROD1 Drill to 9687' with 65R TF, 2.65/2.65bpm 2900/3200psi, 3k WOB & 50fph ave ROP. 03:35 - 03:45 0.17 DRILL P PROD1 Orient TF to 100R. 03:45 - 04:10 0.42 DRILL P PROD1 Drill to 9710' with 90R TF, 2.65/2.65bpm 2900/3250psi, 7k WOB & 70fph ave ROP. 04:10 - 04:15 0.08 DRILL P PROD1 Orient TF to 115R. Up wt = 28k. Run-in wt = 17k. PVT = 226bb1s. 04:15 - 05:15 1.00 DRILL P PROD1 Drill to 9781' with 100R TF, 2.65/2.65bpm 2900/3350psi, 8k WOB & 100fph ave ROP. 05:15 - 05:45 0.50 DRILL P PROD1 Orient TF around to 70R. 05:45 - 07:15 1.50 DRILL P PRODi Drill to 9875' with 45R-90R TF, 2.65/2.65bpm 3000/3550psi, 8k WOB & 60fph ave ROP. 07:15 - 09:30 2.25 DRILL P PROD1 POH for lateral MWD RES BHA. 09:30 - 12:00 2.50 DRILL P PROD1 UO BHA. Adjust motor to 1.2 deg. Re-run HYC BC bit. M/U RES tool and upload. M/U orienter and MHA. OAL = 91.52'. 12:00 - 14:00 2.00 DRILL P PROD1 RIH with MWD RES Lateral BHA #5 with 1.2 deg motor and BC bit #5. SHT tools, OK. RIH. 14:00 - 14:20 0.33 DRILL P PROD1 Log GR tie-in at RA tag. -10' CTD. 14:20 - 14:45 0.42 DRILL P PROD1 RIH. Tag bottom at 9880'. 27K up wt. 14K dwn wt. 14:45 - 16:00 1.25 DRILL P PROD1 Drill Zone 1 Lateral with MWD RES. 2.6 bpm, 3000-3500 psi, 90R, 89 deg incl, Drilled to 9980'. 16:00 - 16:40 0.67 DRILL P PROD1 Orient TF to 70R. 16:40 - 18:00 1.33 DRILL P PROD1 Drill Zone 1 Lateral with MWD RES. 2.6 bpm, 3000-3500 psi, 90R, 89 deg incl, Drilled to 10,042'. 18:00 - 18:40 0.67 DRILL P PROD1 Wiper trip to window. RBIH to btm. 18:40 - 19:05 0.42 DRILL P PROD1 Orient TF around to 90R. Up wt = 28k. Run-in wt = 14k. PVT = 212bb1s. 19:05 - 19:45 0.67 DRILL P PROD1 Drill to 10104' with 75-85R TF, 2.7/2.7bpm 3200/3550psi, 5k WOB & 90fph ave ROP. 19:45 - 19:50 0.08 DRILL P PROD1 Short 100' wiper. RBIH to btm & orient 1 click. 19:50 - 20:15 0.42 DRILL P PROD1 Drill to 10137' with 85R TF, 2.7/2.7bpm 3100/3500psi, 3k WOB & 85fph ave ROP. 20:15 - 20:20 0.08 DRILL P PRODi Short 100' wiper. RBIH to btm. 20:20 - 20:35 0.25 DRILL P PROD1 Drill to 10165' with 85-90R TF, 2.7/2.7bpm 3225/3450psi, 4k WOB & 110fph ave ROP. 20:35 - 20:40 0.08 DRILL P PROD1 P/U & orient 1 click. 20:40 - 21:00 0.33 DRILL P PROD1 Drill to 10200' with 100R TF, 2.65/2.65bpm 3200/3400psi, 4k WOB & 105fph ave ROP. 21:00 - 22:00 1.00 DRILL P PROD1 Wiper trip clean to window. RBIH to btm. Up wt = 29k. Run-in wt = 13k. 22:00 - 22:10 0.17 DRILL P PROD1 Drill to 10223' with 95-100R TF, 2.6/2.6bpm 3150/3425psi, 4k WOB & 115fph ave ROP. 22:10 - 22:35 0.42 DRILL P PROD1 Orient TF around to 70R. Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Operations Summary Report Page5of8 Legal Well Name: C-34 Common Well Name: C-34 Spud Date: 2/22/1988 Event Name: REENTER+COMPLETE Start: 4/7/2006 End: 5/12/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/12/2006 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase II Description of Operations ----_ _ _ _ _ ~__ _ .I - -- - -- - 5/8/2006 22:35 - 23:00 0.42 DRILL P PROD1 Drill to 10255' with 55R TF, 2.5/2.5bpm 3075/3400psi, 7k WOB & 75fph ave ROP. Meanwhile swap well to new Flopro mud with 4% L-T & 12ppb K-G. 23:00 - 23:05 0.08 DRILL P PROD1 P/U & orient 2 clicks. 23:05 - 00:00 0.92 DRILL P PROD1 Drill to 10310' with 75-90R TF, 2.6/2.6bpm 3200/3500psi, 8k WOB & 105fph ave ROP. 5/9/2006 00:00 - 00:15 0.25 DRILL P PROD1 Orient TF around to 70L. 00:15 - 00:55 0.67 DRILL P PROD1 Drill to 10350' with 65L TF, 2.6/2.6bpm 3200/3500psi, 4k WOB & 85fph ave ROP. 00:55 - 01:25 0.50 DRILL P PROD1 Wiper trip to window. 01:25 - 02:15 0.83 DRILL P PROD1 Log up GR & tie into RA pip tag -Add 14' to CTD. 02:15 - 02:50 0.58 DRILL P PROD1 RBIH clean to btm tagged C~3 10363'. Up wt = 29k. Run-in wt = 13k. IAP = 25psi. OAP = 115psi & PVT = 312bb1s. 02:50 - 03:15 0.42 DRILL P PROD1 Drill to 10385' with 20L TF, 2.6/2.6bpm 3050/3200psi, 3k WOB & 100fph ave ROP. 03:15 - 04:00 0.75 DRILL P PROD1 Orient TF on btm -not getting clicks. PUH & orient around to 90L. RBIH to btm. 04:00 - 04:45 0.75 DRILL P PRODi Drill to 10469' with 85L TF, 2.6/2.6bpm 3100/3300psi, 3k WOB & 130fph ave ROP. 04:45 - 06:00 1.25 DRILL P PROD1 Orient & drill to 10550' with 45L TF, 2.6/2.6bpm 3100/3300psi, 3k WOB & 100fph ave ROP. 06:00 - 07:15 1.25 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 07:15 - 07:45 0.50 DRILL P PROD1 Drilling Z1 lateral, 2.6 / 2.6 bpm, 3100-3500 psi, drilled to 10,575' and TF changed. 07:45 - 08:30 0.75 DRILL P PROD1 Orient TF. 08:30 - 09:15 0.75 DRILL P PROD1 Drilling Z1 lateral, 2.6 / 2.6 bpm, 3100 - 3600 psi, 70L, 90 deg incl, 100 fph, Drilled to 10,632'. 09:15 - 09:45 0.50 DRILL P PROD1 Orient TF to 100L. 09:45 - 10:30 0.75 DRILL P PROD1 Drilling Z1 lateral, 2.6 / 2.6 bpm, 3100 - 3600 psi, 100L, 89 deg incl, 100 fph, Drilled to 10,700'. 10:30 - 11:45 1.25 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 11:45 - 12:15 0.50 DRILL P PROD1 Orient TF to 90L. 12:15 - 13:00 0.75 DRILL P PROD1 Drilling Zi lateral, 2.6 / 2.6 bpm, 3100 - 3600 psi, 90L, 89 deg incl, 100 fph, Drilled to 10,784'. 13:00 - 13:45 0.75 DRILL P PROD1 Drilling Z1 lateral, 2.6 / 2.6 bpm, 3100 - 3600 psi, 60L, 89 deg incl, 100 fph, Drilled to 10,845'. Stacking wt. 13:45 - 15:00 1.25 DRILL P PROD1 Wiper trip clean to window. 15:00 - 15:25 0.42 DRILL P PROD1 Log up GR & tie into RA pip tag -Add 13' to CTD. 15:25 - 16:10 0.75 DRILL P PROD1 RBIH clean to btm tagged ~ 10853'. Up wt = 30k. Run-in wt = 14k. IAP = 25psi. OAP = 300psi & PVT = 272bb1s. 16:10 - 16:45 0.58 DRILL P PROD1 Orient TF to 90L. 16:45 - 18:00 1.25 DRILL P PROD1 Drill to 10944' with 80L TF, 2.6/2.6bpm 2950/3200psi, 4k WOB & 85fph ave ROP. 18:00 - 18:30 0.50 DRILL P PROD1 Orient & drill to 10954' with 45L TF, 2.6/2.6bpm 2950/3200psi, 7k WOB & 15fph ave ROP. 18:30 - 19:15 0.75 DRILL P PROD1 Short 100' wiper. 19:15 - 19:30 0.25 DRILL P PROD1 Orient & drill to 11000' with 49L TF, 2.75/2.75bpm 3250l3600psi, 7k WOB & 15fph ave ROP. 19:30 - 21:15 1.75 DRILL P PROD1 Wiper trip clean to window. Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Legal Well Name: Common Well Name: Event Name: Contractor Name; Rig Name: i Date ~ From - To 5/9/2006 21:15 - 21:45 21:45 - 00:00 Operations Summary Report C-34 C-34 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Hours Task 0.50 DRILL 2.25 DRILL Start: 4/7/2006 Rig Release: 5/12/2006 Rig Number: Code I NPT I Phase P P 5/10/2006 00:00 - 00:45 I 0.751 DRILL P 00:45 - 03:50 3.08 DRILL P 03:50 - 04:55 1.08 DRILL P 04:55 - 06:50 1.92 DRILL P 06:50 - 08:30 1.67 DRILL P 08:30 - 09:15 0.75 CASE P 09:15 - 10:45 1.50 CASE N 10:45 - 11:30 I 0.751 CASE I P 11:30 - 11:45 0.25 CASE P 11:45 - 15:30 3.75 CASE P 15:30 - 17:15 1.75 CASE P 17:15 - 17:45 0.50 CASE P 17:45 - 19:20 19:20 - 00:00 5/11/2006 00:00 - 04:50 04:50 - 05:55 05:55 - 06:30 06:30 - 08:00 1.58 CASE P 4.67 CASE N 4.83 CEMT N 1.08 CEMT P 0.58 CEMT P 1.50 CEMT P Page 6 of 8 Spud Date: 2/22/1988 End: 5/12/2006 Description of Operations PROD1 Orient TF around to 45 L PROD1 Drill to 11015' with 49 L TF, 2.65/2.65bpm 3200l3550psi, FS 3150 psi, Up Wt 29 k, 7k WOB, having difficulty getting motorwork, pumped 25 bbl fresh flo-pro pill, drilling rate increased along with motor work while new mud exited bit. PROD1 Drill to 11037', after fresh flo-pro pill passed open hole, bit quit drilling, Geo called TD. PROD1 Madd pass to window, tie-in to RA tags w/ +10' correction PROD1 RIH, tagged btm corrected TD to 11043' PROD1 Paint EOP flags @ 8450' & 6750' & POOH for liner. PROD1 OOH. PJSM. S/B injector. Not able to download resistivity with tool in slips. L/D BHA. Bit grade - 2/2/1. Download resistivity data OK with tool on the catwalk. RUNPRD Pull off SLB CTC. Install Baker CTC. Pull test to 35k & pressure test to 3500psi - OK. SFAL RUNPRD Install dart catcher. Load wiper dart. Launch & chase with mud. Dart did not hit after 70bbls pumped. Troubleshoot & locate dart stuck ~ inner reel valve because of a larger than normal fin. N/B: This vol dart is different from the cmt Pee Wee dart. RUNPRD Retrieve vol dart & push it past inner reel valve. Relaunch & chase dart. Dart hit C~3 66.4bbls. RUNPRD Held PJSM on M/U &RIH with liner. RUNPRD M/U 2-7/8" STL rotating guide shoe, 2 float collars, 1 shoe jt & landing collar. M/U 32jts of 2-7/8" STL 6.16# L-80, 2-7/8" pup & LSL sub. M/U 46jts of 3-3/16" 6.2# L-80 TCII, XO, 1 jt of 3-1/2" 9.3# L80 STL, X nipple, 3-1/2" pups. M/U Baker Deployment sleeve and CTLRT. OAL - 2562.7'. RUNPRD RIH with liner, circ ~ min rate. Correct CTD -7.3' ~ 1st flag. Wt check: Up = 37k. Run-in wt = 20k. Continue RIH smoothly C~3 40fpm thru window into OH. Saw 2nd flag -5' off. Tag btm ~ 11038'. P/U @ 42k & retag TD ~ same depth. Correct CTD to 11043'. RUNPRD Load 5/8" steel ball &circ with mud ~ 2.82/2.82bpm & 2900psi. Set down 10k down on CTLRT. Slow down pumps to 1.15bpm/1500psi ~ 50bbls away. Ball on seat ~ 52.8bbls. Pressure up to 2800psi & release CTLRT. P/U ~ 24k & confirm release. RUNPRD Displace well to 2% KCL at 3.0/3.Obpm & 2000psi. Line-up for pumping cement thru HP filters. Sent used mud to G&I. WAIT RUNPRD Circ while waiting on lab test and cement crew. Cmt Lab test failed on first two test, prematurely setting up, also no Cmt crews available, changed out cmt and additives, ran cmt lab test. Results of Cmt test good at 23:45 hrs, Cmt crew shut down due to 16 hour work limitation WAIT RUNPRD Waiting On Cmt crew, Cmt crew shut down and resting due to 16 hour work limitation, hole taking 2 bph RUNPRD RU cmt lines and equipment, hold PJSM on pumping cement job, slips, trips and falls, break up weather conditions, high pressure testing and pumping and est good communication RUNPRD Batch Mix 38 bbls of cement, hold PJSM w/ oncoming rig crew and cmtr's. Meanwhile continue circulating 2% KCI ~ 2.7/2.6bpm & 1050psi. RUNPRD Cmt to wt @ 06:32 hrs. Flush/PT lines to 4k. Pump 31 bbls cmt Printed; 5/15/2006 3:33:24 PM BP EXPLORATION Page 7 of 8 Operations Summary Report Legal Well Name: C-34 Common Well Name: C-34 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task j Code ! NPT 5/11/2006 106:30 - 08:00 1.501 CEMT P 08:00 - 09:15 ~ 1.25 ~ CEMT ~ P 09:15 - 10:00 0.75 CEMT P 10:00 - 10:30 0.50 EVAL P 10:30 - 10:45 0.25 EVAL P 10:45 - 11:30 0.75 EVAL P 11:30 - 13:45 2.25 EVAL P 13:45 - 15:00 1.25 EVAL P 15:00 - 16:15 1.25 EVAL P 16:15 - 18:00 1.75 EVAL P 18:00 - 19:00 I 1.001 EVAL I P 19:00 - 20:00 1.00 EVAL P 20:00 - 23:30 3.50 EVAL P 23:30 - 00:00 I 0.501 CEMT I P Spud Date: 2/22/1988 Start: 4/7/2006 End: 5/12/2006 Rig Release: 5h 2/2006 Rig Number: Phase ~ Description of Operations RUNPRD slurry ~ 2.11/2.05bpm & 1000psi. Close inner reel valve & clean lines. Load/launch CTWP & confirm launch. Chase with KCL ~2.7/2.6bpm & 1050psi. CTWP engage LWP at 66.4bbls away. Shear plug with 2400psi. Continue displacing LWP ~ 2.13/2.03 bpm, 1050 psi & bump ~ 83.5bbls away. 28.3bbls cmt pumped around shoe. Floats held. Pressure up to 400 psi & sting out of liner. CIP at 08:00 hrs, Top of Liner at 8489', LSL sub at 9983', LC at 11008', FC's at 11039' and 11040', FS at 11041' RUNPRD POOH @ 100fpm pumping @ 0.55bpm to replace CT voidage only. RUNPRD OOH. PJSM. S/B injector. UD CTLRT. LOWERI R/U floor for running looging/cleanout BHA. LOWERI PJSM on P/U &RIH MCNL tools & 1-1/4" CHS tbg. LOWERI Initialize & test logging tools. P/U tools to rig floor. LOWERI P/U logging/cleanout BHA #7 with 2.30" D331 mill, 2-1/8" straight motor, XO, 2jts of 1-1/4" CSH tbg, MCNUCCUGR logging tool carrier, XO, lower MHA, 86jts of 1-1/4" CSH tbg, XO & upper MHA. M/U Injector. LOWERI RIH with logging/cleanout BHA #7 to 8000'. LOWERI W.O.C. to reach 500 psi compressive strength. RIH to 8200'. LOWERI Cleanout wellbore ~ 1.5bpm & log down MCNUCCUGR 30fpm from 8200'. Reciprocate 2x across LSL sub ~ 1.5bpm. Log down to PBTD 2x ~ 11003'. LOWERI Log up ~ 60fpm from PBTD to 8200' while laying-in 150kcps pert pill in liner. LOWERI POH to BHA, flag EOP at 7764' LOWERI PJSM on handling MCNL BHA, open circ sub, POH, std back 1 14" CSH, LD logging tools RUNPRD PJSM, RU, Test Liner lap using 8.5 ppg brine to 2020 psi, Note: IA has 22 psi ISIP = 2014 psi 5 min = 1989 psi 5/12/2006 00:00 - 00:30 0.50 CEMT P 00:30 - 01:15 0.75 PERFO P 01:15 - 03:55 2.67 PERFO~ P 03:55 - 05:45 1.83 PERFO P RUNPRD Continued Testing Liner lap using 8.5 ppg brine to 2020 psi lost 55 psi in first 15 min, lost 33 psi in last 15 min, Lost 88 psi over 30 minutes, allowed 202 psi, Passed. released pressure, RD test equipment. ISIP = 2014 psi 05 min = 1989 psi 10 min=1974 psi 15 min = 1959 psi 20 min = 1945 psi 25 min = 1934 psi 30 min = 1926 psi LOWERI PJSM on handling and running pert gun assy, RU handling tools, Load pipeshed w/ 45 - 2" 6SPF 2006PJ guns and blank. Fax CNL log to ANC Geo. ANC Geo OKs preliminary pert picks. From log data, PBTD = 11014' & TOL = 8478'. LOWERi PU, MU 45 2" 6SPF 2006PJ Perf Guns, 26 stds of 1 1/4" CSH, MHA and CTC, stab inj, BHA length of 2581' LOWERI RIH w/ Perf Gun Assy. Tag PBTD 2x C~? 11010'. Pull to P/U wt & correct CTD to 11014' (PBTD as per MCNL log). PUH & Printed: 5/15/2006 3:33:24 PM BP EXPLORATION Operations Summary Report Page 8 of 8 Legal Well Name: C-34 Common Well Name: C-34 Spud Date: 2/22/1988 Event Name: REENTER+COMPLETE Start: 4/7/2006 End: 5/12/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/12/2006 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/12/2006 03:55 - 05:45 1.83 PERFO P LOWERI position btm shot (~ 11000'. Meanwhile R/U sonogram detector to the wellhead for shot detection. 05:45 - 06:00 0.25 PERFO P LOWERI Drop and pump down 5/8" steel ball w/ 10 bbls of pert pill in front and 10 bbls behind 06:00 - 06:30 0.50 PERFO P LOW ER1 Continue chasing 5/8" Steel ball to seat. PUH & position btm shot @ 11000'. Slow down pumps to 1.Obpm/680psi @ 45bbls away. Ball on seat after 57.1 bbls away. S/D pumps & RBIH to 11005'. PUH very slowly & ramp up to 4100psi with btm shot ~ 11000'. Observe guns fire with good pressure drop indication & sonogram detection. Perforated interval = 10060' - 11000'. 06:30 - 07:30 1.00 PERFO P LOWERI POOH with pert gun BHA C~ 44fpm pumping down the CT C~ 1.04bpm & 500psi. POOH to 8352'. 07:30 - 07:45 0.25 PERFO P LOW ER1 S/D pump &flowcheck well for 15 mins -welt stable. 07:45 - 08:45 1.00 PERFO P LOW ER1 POOH with pert gun BHA ~ 60fpm pumping down the CT 1.27bpm & 400psi. Lost a total of 4bbls while POOH. 08:45 - 09:15 0.50 PERFO P LOW ER1 S/D pump &flowcheck well for 30 mins -well stable. Meanwhile held PJSM for R/B 1-1/4" CSH. 09:15 - 10:15 1.00 PERFO P LOWERI S/B injector. R/B 26 stands of 1-1/4" CSH. 10:15 - 10:30 0.25 PERFO P LOWERI R/U to L/D perf guns. 10:30 - 10:45 0.25 PERFO P LOW ERi PJSM for LD perf guns. 10:45 - 13:00 2.25 PERFO P LOW ER1 L/D 45 jts of perf guns & blanks. ASF! 13:00 - 13:15 0.25 PERFO P LOWERI Load out spent perf guns & blanks. 13:15 - 13:30 0.25 WHSUR P POST M/U check valve, X/O & nozzle. M/U injector. Changeout 1 damaged pin & bearing on the injector. 13:30 - 15:00 1.50 WHSUR P POST RIH nozzle BHA to 2500'. Pump down 38bbls of McOH to nozzle. POOH freeze protecting with 60/40 McOH. FP from 300' with 100% McOH. SI master & swab valves (34-1/2 turns each). Meanwhile clean out pits & tanks. 15:00 - 15:15 0.25 WHSUR P POST OOH. S/B injector. L/D nozzle BHA. 15:15 - 15:30 0.25 WHSUR P POST PJSM for N/D BOPE. 15:30 - 17:30 2.00 WHSUR P POST N/D BOPE. Jack up rig. N/U tree cap & P/Test. Release rig ~ 17:30 Hrs on 5/12/06. Printed: 5/15!2006 3:33:24 PM • Halliburton Company Survey Report _- Company: BP Amoco - _ __ _ __ _ Datc: 5/25!2006 __ Time: '13:49:05 --.ti Paoe: t Field: Prudhoe Bay Cu-urdinatc(~E1 Reference: Well: C 34, Truei4orth Site: PB C Pad Vertical (l~~ll1 Reference: 41:34 '2122/1 988 00:00 67.5 ~~'ell: C-34 Section (~'ti~ Reference: Well (O.OON,O .OOE10390Azi) Wellpath: C-34A Sung Calculation ~~lethud: Minimum Cur vature Db: Orade - - Field: Prudhoe Bay '- - North Slope UNITED STATES Map System:US State Pl ane Coordin ate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Well: C-34 Slot Name: 34 C-34 Well Position: +N/-S 2395.63 ft Northing: 5959657.00 ft Latitude: 70 17 45.926 N +E/-W 2006.37 ft Eas ting : 664504.00 ft Longitude: 148 40 4.317 W Position Uncertainty: 0.00 ft Wellpath: C-34A Drilled From: C-34 500292035801 Tie-on Depth: 9317.60 ft Current Datum: 41: 34 2/22/198 8 00:00 Height 67.50 ft Above System Datum: Mean Sea Level Magnefic Data: 5/5/2006 Declination: 24.54 deg Field Strength: 57606 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.50 0.00 0.00 103.90 Survey Program for Definitive Wellpath Date: 2/17/2006 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 38.00 9317.60 1 : Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot 9343.00 11011.22 MWD (9343.00-11011.22) MWD MWD -Standard Survey MD Incl Azint TVD Svs TVD N/S E/W MapN MapE Tool ft deg deg ft ft ft ft ft ft 34.50 0.00 0.00 34.50 -33.00 0.00 0.00 5959657.00 664504.00 TIE LINE 38.00 0.47 163.44 38.00 -29.50 -0.01 0.00 5959656.99 664504.00 GCT-MS 40.90 0.38 167.02 40.90 -26.60 -0.03 0.01 5959656.97 664504.01 GCT-MS 51.80 0.25 180.51 51.80 -15.70 -0.09 0.02 5959656.91 664504.02 GCT-MS 64.40 0.17 196.88 64.40 -3.10 -0.14 0.01 5959656.86 664504.01 GCT-MS 79.30 0.12 216.57 79.30 11.80 -0.17 0.00 5959656.83 664504.00 GCT-MS 94.40 0.10 229.37 94.40 26.90 -0.19 -0.02 5959656.81 664503.98 GCT-MS 109.15 0.08 230.16 109.15 41.65 -0.21 -0.04 5959656.79 664503.96 GCT-MS 123.75 0.08 230.09 123.75 56.25 -0.22 -0.06 5959656.78 664503.95 GCT-MS 138.35 0.07 231.37 138.35 70.85 -0.23 -0.07 5959656.77 664503.93 GCT-MS 153.30 0.05 211.95 153.30 85.80 -0.25 -0.08 5959656.75 664503.92 GCT-MS 168.10 0.03 184.74 168.10 100.60 -0.25 -0.09 5959656.74 664503.92 GCT-MS 182.75 0.07 214.24 182.75 115.25 -0.27 -0.09 5959656.73 664503.91 GCT-MS 197.70 0.08 248.57 197.70 130.20 -0.28 -0.11 5959656.72 664503.90 GCT-MS 212.30 0.08 233.97 212.30 144.80 -0.29 -0.12 5959656.71 664503.88 GCT-MS 22725 0.08 193.45 227.25 159.75 -0.30 -0.13 5959656.69 664503.87 GCT-MS 242.55 0.08 165.08 242.55 175.05 -0.32 -0.13 5959656.67 664503.87 GCT-MS 257.25 0.08 167.17 257.25 189.75 -0.34 -0.13 5959656.65 664503.88 GCT-MS 271.95 0.08 168.55 271.95 204.45 -0.36 -0.12 5959656.63 664503.88 GCT-MS 286.75 0.10 170.58 286.75 219.25 -0.39 -0.12 5959656.61 664503.89 GCT-MS 301.45 0.12 171.28 301.45 233.95 -0.41 -0.12 5959656.58 664503.89 GCT-MS 316.05 0.15 171.24 316.05 248.55 -0.45 -0.11 5959656.55 664503.90 GCT-MS 331.15 0.17 171.48 331.15 263.65 -0.49 -0.10 5959656.51 664503.91 GCT-MS 345.95 0.18 171.25 345.95 278.45 -0.54 -0.10 5959656.46 664503.91 GCT-MS 360.50 0.20 171.25 360.50 293.00 -0.58 -0.09 5959656.42 664503.92 GCT-MS 375.35 0.22 170.12 375.35 307.85 -0.64 -0.08 5959656.36 664503.93 GCT-MS 390.00 0.23 171.22 390.00 322.50 -0.69 -0.07 5959656.31 664503.94 GCT-MS 404.90 0.27 172.60 404.90 337.40 -0.76 -0.06 5959656.24 664503.95 GCT-MS 419.40 0.27 169.50 419.40 351.90 -0.83 -0.05 5959656.17 664503.96 GCT-MS Halliburton Company Survey Report Company: BP Amoco Flcld: Prudhoe Bay Sic PB C Pad Well: C-34 Wellpath: C-34A Survc~ _ - _ _ - - Date: 5/25/2006 Co-ontinate(lYE) Keference: Vertical (TVD) Reference: Section (VS) Reference: Survey Calculation Method: Time: 13.49 OS Page: 2 Well: C-34. True North 41:34 2x22!'1988 00:00 67.5 Well (O.OON,O.OOE,10.3.90Azi) Minimum Curvature Ub: Oxide MD lncl Azim IUD Sys'CVD ?Y!S E/W MapN 11apF: I~uol ft deg deg ft ft fit ft R ft 434.30 0.23 166.43 434.30 366.80 -0.89 -0.04 5959656.11 664503.98 GCT-MS 449.00 0.23 168.21 449.00 381.50 -0.95 -0.03 5959656.05 664503.99 GCT-MS 463.35 0.23 171.76 463.35 395.85 -1.00 -0.02 5959656.00 664504.00 GCT-MS 477.90 0.23 173.94 477.90 410.40 -1.06 -0.01 5959655.94 664504.01 GCT-MS 492.45 0.23 169.51 492.45 424.95 -1.12 0.00 5959655.88 664504.02 GCT-MS 506.85 0.20 160.53 506.85 439.35 -1.17 0.01 5959655.83 664504.04 GCT-MS 521.65 0.18 156.91 521.65 454.15 -1.22 0.03 5959655.79 664504.06 GCT-MS 536.40 0.18 159.81 536.40 468.90 -1.26 0.05 5959655.74 664504.07 GCT-MS 551.65 0.20 168.87 551.65 484.15 -1.31 0.06 5959655.69 664504.09 GCT-MS 566.20 0.20 182.23 566.20 498.70 -1.36 0.06 5959655.64 664504.09 GCT-MS 581.10 0.18 209.37 581.10 513.60 -1.40 0.05 5959655.60 664504.08 GCT-MS 595.80 0.15 237.87 595.80 528.30 -1.44 0.02 5959655.57 664504.06 GCT-MS 610.70 0.12 254.18 610.70 543.20 -1.45 -0.01 5959655.55 664504.02 GCT-MS 625.25 0.08 266.29 625.25 557.75 -1.45 -0.03 5959655.55 664504.00 GCT-MS 640.00 0.07 276.41 640.00 572.50 -1.45 -0.05 5959655.55 664503.98 GCT-MS 654.75 0.05 286.93 654.75 587.25 -1.45 -0.07 5959655.55 664503.97 GCT-MS 669.35 0.02 315.96 669.35 601.85 -1.45 -0.07 5959655.55 664503.96 GCT-MS 684.25 0.02 33.73 684.25 616.75 -1.44 -0.07 5959655.56 664503.96 GCT-MS 698.95 0.07 97.28 698.95 631.45 -1.44 -0.06 5959655.56 664503.97 GCT-MS 713.70 0.12 112.43 713.70 646.20 -1.45 -0.04 5959655.55 664503.99 GCT-MS 728.35 0.15 120.08 728.35 660.85 -1.47 -0.01 5959655.54 664504.02 GCT-MS 743.00 0.15 127.16 743.00 675.50 -1.49 0.02 5959655.52 664504.05 GCT-MS 758.20 0.17 133.91 758.20 690.70 -1.51 0.05 5959655.49 664504.09 GCT-MS 773.20 0.17 139.88 773.20 705.70 -1.55 0.08 5959655.46 664504.12 GCT-MS 788.00 0.17 152.89 788.00 720.50 -1.58 0.11 5959655.42 664504.14 GCT-MS 802.45 0.17 180.68 802.45 734.95 -1.62 0.12 5959655.38 664504.15 GCT-MS 817.25 0.15 208.07 817.25 749.75 -1.66 0.11 5959655.34 664504.14 GCT-MS 832.35 0.13 221.84 832.35 764.85 -1.69 0.09 5959655.31 664504.12 GCT-MS 847.15 0.10 224.63 847.15 779.65 -1.71 0.07 5959655.29 664504.10 GCT-MS 861.95 0.07 225.69 861.95 794.45 -1.73 0.05 5959655.27 664504.09 GCT-MS 876.65 0.03 213.98 876.65 809.15 -1.74 0.04 5959655.26 664504.08 GCT-MS 891.45 0.00 163.57 891.45 823.95 -1.74 0.04 5959655.26 664504.08 GCT-MS 906.30 0.05 117.10 906.30 838.80 -1.75 0.05 5959655.26 664504.08 GCT-MS 920.85 0.15 110.71 920.85 853.35 -1.75 0.07 5959655.25 664504.11 GCT-MS 935.55 0.20 117.43 935.55 868.05 -1.77 0.11 5959655.23 664504.15 GCT-MS 950.20 0.20 121.05 950.20 882.70 -1.80 0.16 5959655.21 664504.19 GCT-MS 965.20 0.20 122.76 965.20 897.70 -1.83 0.20 5959655.18 664504.24 GCT-MS 979.90 0.18 123.20 979.90 912.40 -1.85 0.24 5959655.15 664504.28 GCT-MS 994.70 0.17 130.48 994.70 927.20 -1.88 0.28 5959655.13 664504.32 GCT-MS 1009.60 0.17 154.88 1009.60 942.10 -1.91 0.30 5959655.09 664504.34 GCT-MS 1024.45 0.17 180.14 1024.45 956.95 -1.96 0.31 5959655.05 664504.36 GCT-MS 1039.00 0.15 187.69 1039.00 971.50 -2.00 0.31 5959655.01 664504.35 GCT-MS 1053.75 0.13 185.54 1053.75 986.25 -2.03 0.31 5959654.98 664504.35 GCT-MS 1068.45 0.12 183.82 1068.45 1000.95 -2.06 0.30 5959654.94 664504.35 GCT-MS 1083.75 0.10 183.44 1083.75 1016.25 -2.09 0.30 5959654.91 664504.35 GCT-MS 1098.75 0.08 178.36 1098.75 1031.25 -2.12 0.30 5959654.89 664504.35 GCT-MS 1113.75 0.07 156.98 1113.75 1046.25 -2.14 0.31 5959654.87 664504.35 GCT-MS 1128.35 0.07 124.87 1128.35 1060.85 -2.15 0.32 5959654.86 664504.36 GCT-MS 1143.00 0.13 106.56 1143.00 1075.50 -2.16 0.34 5959654.85 664504.39 GCT-MS 1157.80 0.22 104.09 1157.80 1090.30 -2.17 0.38 5959654.84 664504.43 GCT-MS 1172.45 0.23 105.83 1172.45 1104.95 -2.19 0.44 5959654.83 664504.49 GCT-MS 1186.90 0.22 110.11 1186.90 1119.40 -2.20 0.49 5959654.81 664504.54 GCT-MS Halliburton Company Survey Report Company: BP Amoco field: Prudhoe Bay Site: PB C Pad ~~ ell: C-34 ~~ellpath: C-34A Date: 5/25/2006 Time: '13-4~J-05 Pa~c: Co-ordinate(NE) Re(crence: Well; C-34, True North Vertical (TVD) Refcrcuce: 41:34 2/22/1988 00:00 67.5 Section (VS) Reference: Well (O.OON,O.OOE,103.90Azi) Survey Calculation Method: Minimum Curvature Db: 3 racle Survey MU lncl Azim T~ D Sys TVD N/S E/W Map\ MapE Tool ft deg deg ft ft_ _ ft ft it -- ft _ _ - - 1201.45 0.22 112.89 1201.45 1133.95 -2.22 0.54 5959654.79 664504.59 GCT-MS 1216.50 0.20 116.21 1216.50 1149.00 -2.25 0.59 5959654.77 664504.64 GCT-MS 1231.20 0.17 133.29 1231.20 1163.70 -2.27 0.63 5959654.74 664504.68 GCT-MS 1245.70 0.15 157.57 1245.70 1178.20 -2.31 0.66 5959654.71 664504.71 GCT-MS 1260.20 0.12 166.68 1260.20 1192.70 -2.34 0.67 5959654.68 664504.72 GCT-MS 1275.15 0.08 159.76 1275.15 1207.65 -2.36 0.67 5959654.65 664504.73 GCT-MS 1289.95 0.08 153.38 1289.95 1222.45 -2.38 0.68 5959654.63 664504.73 GCT-MS 1304.50 0.08 140.15 1304.50 1237.00 -2.40 0.69 5959654.62 664504.75 GCT-MS 1319.45 0.13 112.91 1319.45 1251.95 -2.41 0.72 5959654.60 664504.77 GCT-MS 1334.25 0.22 100.14 1334.25 1266.75 -2.42 0.76 5959654.59 664504.81 GCT-MS 1348.65 0.25 104.01 1348.65 1281.15 -2.44 0.82 5959654.58 664504.87 GCT-MS 1363.30 0.23 106.82 1363.29 1295.79 -2.45 0.88 5959654.57 664504.93 GCT-MS 1378.10 0.23 108.79 1378.09 1310.59 -2.47 0.93 5959654.55 664504.99 GCT-MS 1393.40 0.22 113.19 1393.39 1325.89 -2.49 0.99 5959654.53 664505.04 GCT-MS 1408.20 0.18 125.90 1408.19 1340.69 -2.52 1.03 5959654.51 664505.09 GCT-MS 1422.70 0.15 146.17 1422.69 1355.19 -2.55 1.06 5959654.48 664505.12 GCT-MS 1437.55 0.12 155.06 1437.54 1370.04 -2.58 1.08 5959654.45 664505.14 GCT-MS 1452.10 0.10 150.65 1452.09 1384.59 -2.60 1.09 5959654.42 664505.15 GCT-MS 1466.60 0.08 141.39 1466.59 1399.09 -2.62 1.11 5959654.40 664505.16 GCT-MS 1481.70 0.10 129.59 1481.69 1414.19 -2.64 1.12 5959654.39 664505.18 GCT-MS 1496.25 0.17 113.92 1496.24 1428.74 -2.65 1.15 5959654.37 664505.21 GCT-MS 1511.05 0.25 101.93 1511.04 1443.54 -2.67 1.20 5959654.36 664505.26 GCT-MS 1525.65 0.25 104.63 1525.64 1458.14 -2.68 1.27 5959654.34 664505.32 GCT-MS 1540.15 0.23 110.46 1540.14 1472.64 -2.70 1.32 5959654.33 664505.38 GCT-MS 1554.75 0.23 114.53 1554.74 1487.24 -2.73 1.38 5959654.31 664505.44 GCT-MS 1570.05 0.18 131.78 1570.04 1502.54 -2.75 1.42 5959654.28 664505.48 GCT-MS 1585.20 0.15 148.96 1585.19 1517.69 -2.79 1.45 5959654.25 664505.51 GCT-MS 1599.95 0.13 151.16 1599.94 1532.44 -2.82 1.47 5959654.22 664505.53 GCT-MS 1614.65 0.13 150.32 1614.64 1547.14 -2.85 1.49 5959654.19 664505.55 GCT-MS 1629.35 0.12 145.93 1629.34 1561.84 -2.87 1.50 5959654.16 664505.56 GCT-MS 1643.95 0.12 127.10 1643.94 1576.44 -2.90 1.52 5959654.14 664505.59 GCT-MS 1658.50 0.20 110.86 1658.49 1590.99 -2.91 1.56 5959654.12 664505.62 GCT-MS 1673.25 0.27 110.49 1673.24 1605.74 -2.94 1.62 5959654.10 664505.68 GCT-MS 1688.10 0.25 114.11 1688.09 1620.59 -2.96 1.68 5959654.08 664505.74 GCT-MS 1702.95 0.23 121.67 1702.94 1635.44 -2.99 1.73 5959654.05 664505.80 GCT-MS 1717.40 0.18 138.72 1717.39 1649.89 -3.02 1.77 5959654.02 664505.84 GCT-MS 1732.20 0.15 158.21 1732.19 1664.69 -3.06 1.80 5959653.98 664505.86 GCT-MS 1747.00 0.13 165.02 1746.99 1679.49 -3.09 1.81 5959653.95 664505.87 GCT-MS 1761.90 0.13 161.68 1761.89 1694.39 -3.12 1.82 5959653.92 664505.88 GCT-MS 1776.45 0.12 153.52 1776.44 1708.94 -3.15 1.83 5959653.89 664505.90 GCT-MS 1791.20 0.13 142.45 1791.19 1723.69 -3.18 1.85 5959653.86 664505.91 GCT-MS 1805.80 0.17 124.83 1805.79 1738.29 -3.21 1.87 5959653.84 664505.94 GCT-MS 1820.60 0.25 121.52 1820.59 1753.09 -3.24 1.92 5959653.81 664505.99 GCT-MS 1835.50 0.33 134.21 1835.49 1767.99 -3.28 1.98 5959653.76 664506.05 GCT-MS 1849.95 0.37 139.62 1849.94 1782.44 -3.35 2.04 5959653.70 664506.11 GCT-MS 1864.60 0.37 142.80 1864.59 1797.09 -3.42 2.10 5959653.63 664506.17 GCT-MS 1878.85 0.35 145.84 1878.84 1811.34 -3.49 2.15 5959653.56 664506.22 GCT-MS 1893.35 0.35 146.95 1893.34 1825.84 -3.57 2.20 5959653.48 664506.27 GCT-MS 1907.90 0.35 147.12 1907.89 1840.39 -3.64 2.25 5959653.41 664506.32 GCT-MS 1922.50 0.33 144.16 1922.49 1854.99 -3.71 2.30 5959653.34 664506.37 GCT-MS 1937.90 0.33 136.09 1937.89 1870.39 -3.78 2.35 5959653.27 664506.43 GCT-MS 1952.40 0.35 129.99 1952.39 1884.89 -3.84 2.41 5959653.21 664506.50 GCT-MS 1967.00 0.40 125.93 1966.99 1899.49 -3.90 2.49 5959653.16 664506.57 GCT-MS Halliburton Company Survey Report Company: BP Amoco Ticid: Prudhoe Bay Site: PB C Pad Well: C-34 Wellpath: C-34A Suncv __--- Date: 5125`2006 Time: 13-49-05 Page: 4 Co-ordinatct VE) Reference: Weil: C-34. True North Vertical (1~~ I)) Reference: 41:34 2/2~i1988 OO:QO 67.5 Section (~'S~ Reference: Well (O.OON,O.OOE,103-90ALi) Sur~c~ C;~Iculation Merhud: Minimum Curvature Dh: Oracle -- ~~tU Incl Azim TAD SysTVD N/S E/W MapN MapN: Tooi ft deg deg ft ft ft ft fit ft ~ 1981.40 0.40 137.28 1981.39 1913.89 -3.96 2.56 5959653.09 664506.65 GCT-MS 1995.80 0.37 152.06 1995.79 1928.29 -4.04 2.62 5959653.02 664506.71 GCT-MS 2010.20 0.35 148.47 2010.19 1942.69 -4.12 2.67 5959652.94 664506.75 GCT-MS 2024.40 0.33 140.21 2024.39 1956.89 -4.19 2.71 5959652.87 664506.80 GCT-MS 2039.00 0.32 135.77 2038.99 1971.49 -4.25 2.77 5959652.81 664506.86 GCT-MS 2053.60 0.32 133.51 2053.59 1986.09 -4.31 2.83 5959652.76 664506.92 GCT-MS 2068.30 0.32 132.74 2068.29 2000.79 -4.36 2.89 5959652.70 664506.98 GCT-MS 2083.00 0.33 127.80 2082.99 2015.49 -4.42 2.95 5959652.65 664507.05 GCT-MS 2097.60 0.45 125.02 2097.59 2030.09 -4.48 3.03 5959652.59 664507.13 GCT-MS 2111.10 0.55 128.93 2111.09 2043.59 -4.55 3.13 5959652.52 664507.22 GCT-MS 2122.40 0.55 131.60 2122.39 2054.89 -4.62 3.21 5959652.45 664507.31 GCT-MS 2131.90 0.52 134.19 2131.89 2064.39 -4.68 3.27 5959652.39 664507.37 GCT-MS 2141.70 0.48 137.14 2141.69 2074.19 -4.74 3.33 5959652.34 664507.43 GCT-MS 2151.50 0.45 139.40 2151.49 2083.99 -4.80 3.39 5959652.28 664507.49 GCT-MS 2161.30 0.42 140.24 2161.29 2093.79 -4.86 3.43 5959652.22 664507.54 GCT-MS 2172.50 0.38 135.46 2172.48 2104.98 -4.91 3.49 5959652.16 664507.59 GCT-MS 2186.80 0.38 131.70 2186.78 2119.28 -4.98 3.55 5959652.10 664507.66 GCT-MS 2201.00 0.37 133.61 2200.98 2133.48 -5.04 3.62 5959652.04 664507.73 'GCT-MS 2215.50 0.37 130.99 2215.48 2147.98 -5.11 3.69 5959651.98 664507.80 GCT-MS 2229.70 0.35 127.66 2229.68 2162.18 -5.16 3.76 5959651.92 664507.87 GCT-MS 2244.60 0.43 125.31 2244.58 2177,08 -5.22 3.84 5959651.86 664507.96 .GCT-MS 2259.00 0.55 126.58 2258.98 2191.48 -5.29 3.94 5959651.79 664508.06 GCT-MS 2273.40 0.57 131.05 2273.38 2205.88 -5.38 4.05 5959651.71 664508.17 GCT-MS 2288.10 0.53 133.26 2288.08 2220.58 -5.48 4.16 5959651.62 664508.27 GCT-MS 2302.40 0.50 134.15 2302.38 2234.88 -5.57 4.25 5959651.53 664508.37 GCT-MS 2317.20 0.47 136.28 2317.18 2249.68 -5.65 4.34 5959651.44 664508.46 GCT-MS 2331.60 0.43 136.53 2331.58 2264.08 -5.74 4.42 5959651.36 664508.54 GCT-MS 2346.00 0.43 134.01 2345.98 2278.48 -5.81 4.49 5959651.29 664508.62 GCT-MS 2360.40 0.45 132.89 2360.38 2292.88 -5.89 4.57 5959651.21 664508.70 GCT-MS 2374.90 0.48 131.46 2374.88 2307.38 -5.97 4.66 5959651.14 664508.79 GCT-MS 2389.20 0.53 127.47 2389.18 2321.68 -6.05 4.76 5959651.06 664508.89 GCT-MS 2403.70 0.57 124.94 2403.68 2336.18 -6.13 4.87 5959650.98 664509.00 GCT-MS 2418.10 0.57 122.72 2418.08 2350.58 -6.21 4.99 5959650.90 664509.12 GCT-MS 2432.70 0.60 124.63 2432.68 2365.18 -6.29 5.11 5959650.82 664509.25 GCT-MS 2447.50 0.57 134.39 2447.48 2379.98 -6.39 5.23 5959650.73 664509.37 GCT-MS 2461.80 0.50 131.97 2461.77 2394.27 -6.48 5.33 5959650.64 664509.47 GCT-MS 2476.50 0.47 124.99 2476.47 2408.97 -6.56 5.42 5959650.56 664509.56 GCT-MS 2488.30 0.48 129.94 2488.27 2420.77 -6.62 5.50 5959650.51 664509.64 GCT-MS 2498.20 0.50 126.56 2498.17 2430.67 -6.67 5.57 5959650.46 664509.71 GCT-MS 2508.60 0.47 117.64 2508.57 2441.07 -6.72 5.64 5959650.41 664509.79 GCT-MS 2522.00 0.43 115.99 2521.97 2454.47 -6.76 5.74 5959650.36 664509.88 GCT-MS 2536.60 0.40 118.10 2536.57 2469.07 -6.81 5.83 5959650.32 664509.98 GCT-MS 2551.00 0.42 117.48 2550.97 2483.47 -6.86 5.92 5959650.27 664510.07 GCT-MS 2565.70 0.47 116.01 2565.67 2498.17 -6.91 6.02 5959650.22 664510.17 GCT-MS 2579.90 0.48 114.86 2579.87 2512.37 -6.96 6.13 5959650.18 664510.28 GCT-MS 2594.00 0.45 114.22 2593.97 2526.47 -7.01 6.23 5959650.13 664510.38 GCT-MS 2608.50 0.45 115.73 2608.47 2540.97 -7.06 6.34 5959650.08 664510.49 GCT-MS 2622.90 0.43 117.94 2622.87 2555.37 -7.11 6.43 5959650.04 664510.59 GCT-MS 2637.40 0.42 120.05 2637.37 2569.87 -7.16 6.53 5959649.99 664510.68 GCT-MS 2652.20 0.37 125.33 2652.17 2584.67 -7.21 6.61 5959649.93 664510.77 GCT-MS 2666.50 0.30 130.43 2666.47 2598.97 -7.26 6.68 5959649.88 664510.84 GCT-MS 2680.90 0.28 132.73 2680.87 2613.37 -7.31 6.74 5959649.84 664510.89 GCT-MS Halliburton Company Survey Report Cirmpany: BP Amoco Field: Prudhoe Bay Site: PB C Pad ~t cu: C-34 ~~ cup>ith: C-34A - - Date: 5/25x2006 Times 13:49:05 Pages Co-ordinate(NE) Reference: Well: C-34, True Nort~n Vertical ('I'VD) Reference: 41:34 '?!22/1988 00:00 67.5 Section (VS) Reference: Well (O.OON,O.OOE,103-90Azi) Survev Calculation Method: Minimum Curvature Db: Oracle _- -- - _ ~ - -- i, J Su rs c~ - - _ _ MD lncl Azim 1'VU SysT1'D N/S E1W MapN ~tapF. Tool ft deg dey ft ft ft ft ft it 2695.20 0.25 137.83 2695.17 2627.67 -7.36 6.78 5959649.79 664510.94 GCT-MS 2709.50 0.23 143.60 2709.47 2641.97 -7.41 6.82 5959649.75 664510.98 GCT-MS 2724.00 0.23 147.54 2723.97 2656.47 -7.45 6.85 5959649.70 664511.01 GCT-MS 2738.50 0.18 149.93 2738.47 2670.97 -7.50 6.88 5959649.65 664511.04 GCT-MS 2753.10 0.13 150.57 2753.07 2685.57 -7.53 6.90 5959649.62 664511.06 GCT-MS 2767.20 0.13 145.76 2767.17 2699.67 -7.56 6.92 5959649.59 664511.08 GCT-MS 2781.80 0.15 132.66 2781.77 2714.27 -7.59 6.94 5959649.57 664511.10 GCT-MS 2796.30 0.20 125.24 2796.27 2728.77 -7.61 6.97 5959649.54 664511.14 GCT-MS 2810.50 0.25 130.11 2810.47 2742.97 -7.65 7.02 5959649.51 664511.18 GCT-MS 2825.20 0.25 136.08 2825.17 2757.67 -7.69 7.07 5959649.47 664511.23 GCT-MS 2839.50 0.25 140.34 2839.47 2771.97 -7.74 7.11 5959649.42 664511.27 GCT-MS 2853.70 0.22 148.47 2853.67 2786.17 -7.79 7.14 5959649.37 664511.31 GCT-MS 2867.90 0.17 142.76 2867.87 2800.37 -7.83 7.17 5959649.33 664511.34 GCT-MS 2882.40 0.15 131.39 2882.37 2814.87 -7.86 7.20 5959649.31 664511.36 GCT-MS 2896.90 0.20 128.38 2896.87 2829.37 -7.88 7.23 5959649.28 664511.40 GCT-MS 2911.20 0.25 126.09 2911.17 2843.67 -7.92 7.27 5959649.24 664511.44 GCT-MS 2926.00 0.27 123.68 2925.97 2858.47 -7.96 7.33 5959649.21 664511.50 GCT-MS 2940.20 0.27 120.68 2940.17 2872.67 -7.99 7.39 5959649.17 664511.56 GCT-MS 2954.40 0.27 121.24 2954.37 2886.87 -8.03 7.44 5959649.14 664511.62 GCT-MS 2969.10 0.25 127.93 2969.07 2901.57 -8.06 7.50 5959649.10 664511.67 GCT-MS 2983.60 0.25 124.01 2983.57 2916.07 -8.10 7.55 5959649.07 664511.72 GCT-MS 2998.10 0.28 115.03 2998.07 2930.57 -8.13 7.61 5959649.04 664511.78 GCT-MS 3012.70 0.30 115.82 3012.67 2945.17 -8.17 7.67 5959649.01 664511.85 GCT-MS 3027.20 0.30 116.98 3027.17 2959.67 -8.20 7.74 5959648.97 664511.92 GCT-MS 3041.80 0.28 119.33 3041.77 2974.27 -8.23 7.81 5959648.94 664511.98 GCT-MS 3056.70 0.27 121.34 3056.67 2989.17 -8.27 7.87 5959648.91 664512.05 GCT-MS 3070.90 0.25 122.68 3070.86 3003.36 -8.30 7.92 5959648.87 664512.10 GCT-MS 3085.20 0.22 124.29 3085.16 3017.66 -8.34 7.97 5959648.84 664512.15 GCT-MS 3099.70 0.25 118.25 3099.66 3032.16 -8.37 8.02 5959648.81 664512.20 GCT-MS 3114.20 0.32 113.20 3114.16 3046.66 -8.40 8.09 5959648.78 664512.27 GCT-MS 3128.80 0.33 116.57 3128.76 3061.26 -8.43 8.16 5959648.75 664512.34 GCT-MS 3143.20 0.32 117.94 3143.16 3075.66 -8.47 8.24 5959648.71 664512.42 GCT-MS 3157.60 0.30 117.36 3157.56 3090.06 -8.51 8.31 5959648.68 664512.49 GCT-MS 3171.80 0.28 117.14 3171.76 3104.26 -8.54 8.37 5959648.65 664512.55 GCT-MS 3186.10 0.27 117.57 3186.06 3118.56 -8.57 8.43 5959648.62 664512.61 GCT-MS 3200.70 0.25 117.43 3200.66 3133.16 -8.60 8.49 5959648.59 664512.67 GCT-MS 3215.80 0.28 113.71 3215.76 3148.26 -8.63 8.55 5959648.56 664512.74 GCT-MS 3230.40 0.32 110.12 3230.36 3162.86 -8.66 8.62 5959648.53 664512.81 GCT-MS 3244.80 0.35 112.40 3244.76 3177.26 -8.69 8.70 5959648.50 664512.89 GCT-MS 3259.10 0.35 115.67 3259.06 3191.56 -8.73 8.78 5959648.47 664512.97 GCT-MS 3273.30 0.33 117.20 3273.26 3205.76 -8.76 8.86 5959648.43 664513.04 GCT-MS 3287.50 0.32 118.47 3287.46 3219.96 -8.80 8.93 5959648.40 664513.12 GCT-MS 3301.90 0.30 116.91 3301.86 3234.36 -8.84 9.00 5959648.36 664513.19 GCT-MS 3316.70 0.28 117.37 3316.66 3249.16 -8.87 9.06 5959648.33 664513.25 GCT-MS 3331.30 0.30 115.74 3331.26 3263.76 -8.90 9.13 5959648.30 664513.32 GCT-MS 3345.70 0.32 111.89 3345.66 3278.16 -8.94 9.20 5959648.27 664513.39 GCT-MS 3360.10 0.33 110.32 3360.06 3292.56 -8.97 9.28 5959648.24 664513.47 GCT-MS 3374.20 0.37 111.46 3374.16 3306.66 -9.00 9.36 5959648.21 664513.55 GCT-MS 3388.40 0.38 114.82 3388.36 3320.86 -9.03 9.44 5959648.18 664513.64 GCT-MS 3402.80 0.37 116.72 3402.76 3335.26 -9.07 9.53 5959648.14 664513.72 GCT-MS 3416.90 0.35 118.84 3416.86 3349.36 -9.11 9.61 5959648.10 664513.80 GCT-MS 3431.20 0.32 122.93 3431.16 3363.66 -9.16 9.68 5959648.06 664513.87 GCT-MS 3445.40 0.28 125.79 3445.36 3377.86 -9.20 9.74 5959648.02 664513.94 GCT-MS Halliburton Company Survey Report Company: BP Amoco Field: Prudhoe Bay Site: PB C Pad Well: C-34 Wellpath: C-34A Sur~ec - . _ --- Date: 5/2 512 0 0 6 Time: 13:49:05 Page: 6 Co-ordinate(NE;) Ftefcrcncc: Well: C-34, True North Vertical (TVD) Relerencc: 41:34 2/22l198S 00:00 67.5 Section (VS) Re~fercnce: Well (O.OON,O.OOE.103.90Azi) Survey Calculatimi Method: Minimum Curvature llb: Oracle MD Incl Azim TVD 5~c1~'D N/S E/H' Map\ 11apE Tool ft deg deg ft rt ft R ft ft 3459.80 0.28 124.11 3459.76 3392.26 -9.24 9.80 5959647.98 664514.00 GCT-MS 3474.00 0.27 121.27 3473.96 3406.46 -9.28 9.85 5959647.94 664514.05 GCT-MS 3488.50 0.28 117.92 3488.46 3420.96 -9.31 9.91 5959647.91 664514.11 GCT-MS 3502.80 0.32 114.55 3502.76 3435.26 -9.34 9.98 5959647.88 664514.18 GCT-MS 3517.70 0.38 116.90 3517.66 3450.16 -9.38 10.06 5959647.84 664514.27 GCT-MS 3532.60 0.42 122.51 3532.56 3465.06 -9.43 10.15 5959647.79 664514.36 GCT-MS 3546.90 0.40 125.65 3546.86 3479.36 -9.49 10.24 5959647.74 664514.44 GCT-MS 3561.50 0.35 129.36 3561.46 3493.96 -9.55 10.31 5959647.68 664514.52 GCT-MS 3576.10 0.30 126.45 3576.06 3508.56 -9.60 10.38 5959647.63 664514.59 GCT-MS 3590.60 0.28 120.41 3590.56 3523.06 -9.64 10.44 5959647.59 664514.65 GCT-MS 3605.00 0.27 119.44 3604.96 3537.46 -9.68 10.50 5959647.56 664514.71 GCT-MS 3619.70 0.27 120.54 3619.66 3552.16 -9.71 10.56 5959647.52 664514.77 GCT-MS 3634.40 0.27 122.17 3634.36 3566.86 -9.75 10.62 5959647.49 664514.83 GCT-MS 3648.90 0.28 121.75 3648.86 3581.36 -9.78 10.68 5959647.45 664514.89 GCT-MS 3663.40 0.35 126.22 3663.36 3595.86 -9.83 10.74 5959647.41 664514.96 GCT-MS 3678.00 0.38 133.64 3677.96 3610.46 -9.89 10.82 5959647.35 664515.03 GCT-MS 3692.60 0.37 136.67 3692.56 3625.06 -9.96 10.88 5959647.29 664515.10 GCT-MS 3707.20 0.37 139.35 3707.16 3639.66 -10.03 10.95 5959647.22 664515.16 GCT-MS 3721.90 0.37 142.88 3721.85 3654.35 -10.10 11.01 5959647.14 664515.22 GCT-MS 3736.80 0.32 145.30 3736.75 3669.25 -10.17 11.06 5959647.07 664515.28 GCT-MS 3751.20 0.25 143.59 3751.15 3683.65 -10.23 11.10 5959647.02 664515.32 GCT-MS 3765.70 0.23 147.09 3765.65 3698.15 -10.28 11.13 5959646.97 664515.36. GCT-MS 3780.10 0.23 149.09 3780.05 3712.55 -10.33 11.17 5959646.92 664515.39 GCT-MS 3794.60 0.25 141.09 3794.55 3727.05 -10.38 11.20 5959646.87 664515.42. GCT-MS 3809.30 0.27 134.42 3809.25 3741.75 -10.43 11.25 5959646.82 664515.47 GCT-MS 3824.30 0.32 136.76 3824.25 3756.75 -10.48 11.30 5959646.77 664515.52 GCT-MS 3839.10 0.37 143.33 3839.05 3771.55 -10.55 11.36 5959646.70 664515.55 GCT-MS 3854.00 0.37 144.71 3853.95 3786.45 -10.63 11.41 5959646.62 664515.64 GCT-MS 3868.50 0.37 145.62 3868.45 3800.95 -10.71 11.47 5959646.55 664515.70 GCT-MS 3883.10 0.37 148.03 3883.05 3815,55 -10.79 11.52 5959646.47 664515.75 GCT-MS 3898.00 0.37 148.65 3897.95 3830,45 -10.87 11.57 5959646.39 664515.80 GCT-MS 3912.60 0.35 149.12 3912.55 3845.05 -10.95 11.62 5959646.31 664515.85 GCT-MS 3927.60 0.35 151.85 3927.55 3860.05 -11.03 11.66 5959646.23 664515.90 GCT-MS 3942.10 0.32 153.52 3942.05 3874.55 -11.10 11.70 5959646.16 664515.94 GCT-MS 3956.90 0.28 154.52 3956.85 3889.35 -11.17 11.73 5959646.09 664515.97 GCT-MS 3971.40 0.25 152:32 3971.35 3903.85 -11.23 11.76 5959646.03 664516.00 GCT-MS 3985.80 0.23 150.07 3985.75 3918.25 -11.28 11.79 5959645.98 664516.03 GCT-MS 4000.50 0.23 150.10 4000.45 3932.95 -11.33 11.82 5959645.93 664516.07 GCT-MS 4014.70 0.23 148.79 4014.65 3947.15 -11.38 11.85 5959645.88 664516.10 GCT-MS 4029.00 0.23 145.99 4028.95 3961.45 -11.43 11.88 5959645.83 664516.13 GCT-MS 4043.40 0.28 140.27 4043.35 3975.85 -11.48 11.92 5959645.78 664516.17 GCT-MS 4057.60 0.35 139.91 4057.55 3990.05 -11.54 11.97 5959645.72 664516.22 GCT-MS 4071.90 0.38 142.79 4071.85 4004.35 -11.61 12.03 5959645.65 664516.28 GCT-MS 4086.30 0.38 144.04 4086.25 4018.75 -11.69 12.08 5959645.58 664516.34 GCT-MS 4100.90 0.35 144.59 4100.85 4033.35 -11.77 12.14 5959645.50 664516.39 GCT-MS 4115.70 0.35 145.54 4115.65 4048.15 -11.84 12.19 5959645.43 664516.44 GCT-MS 4129.80 0.37 147.70 4129.75 4062.25 -11.91 12.24 5959645.36 664516.50 GCT-MS 4144.40 0.37 147.94 4144.35 4076.85 -11.99 12.29 5959645.28 664516.55 GCT-MS 4159.30 0.35 148.07 4159.25 4091.75 -12.07 12.34 5959645.20 664516.60 GCT-MS 4173.90 0.35 149.57 4173.85 4106.35 -12.15 12.38 5959645.13 664516.65 GCT-MS 4188.30 0.35 151.54 4188.25 4120.75 -12.23 12.43 5959645.05 664516.69 GCT-MS 4202.50 0.32 155.73 4202.45 4134.95 -12.30 12.47 5959644.98 664516.73 GCT-MS Halliburton Company Survey Report - -- __ Company: BP - _ _ _ __ Amoco - ----- --_ _- - _ _ Date: 5i25i2006 Time 13.49:05 _ _ - -- - Page: 7 Field: Pru dhoe Bay Co-ordinate(NL~) Keference: Well: C-34, T I rue North Site: PB C Pad Vertical (TVD ) Re[erence: 41:34 2/22/ 1988 00:00 67.5 ~~eJl: C-3 4 Section (VS) ReSerence: Well (O.OON,O.OOE,103.90Azi) ~~ellpat6: C-3 ~_ 4A Survey Calcu lation Merhod: Minimum Cu rvature Ub: Orade Survey N1D Incl Azim TVD Sys TVD N/S E/W MapV MapE Tool ft deg deg ft ft ft ft ft ft 4217.10 0.30 151.90 4217.05 4149.55 -12.37 12.50 5959644.91 664516.77 GCT-MS 4231.40 0.28 146.19 4231.35 4163.85 -12.43 12.54 5959644.84 664516.80 GCT-MS 4245.70 0.28 149.09 4245.65 4178.15 -12.49 12.57 5959644.79 664516.84 GCT-MS 4259.80 0.30 148.74 4259.75 4192.25 -12.55 12.61 5959644.73 664516.88 GCT-MS 4274.60 0.32 144.85 4274.55 4207.05 -12.62 12.66 5959644.66 664516.93 GCT-MS 4289.10 0.37 140.54 4289.05 4221.55 -12.69 12.71 5959644.59 664516.98 GCT-MS 4303.20 0.45 142.85 4303.15 4235.65 -12.77 12.77 5959644.51 664517.05 GCT-MS 4317.80 0.48 150.36 4317.75 4250.25 -12.87 12.84 5959644.42 664517.11 GCT-MS 4332.00 0.47 153.99 4331.94 4264.44 -12.97 12.89 5959644.31 664517.17 GCT-MS 4346.20 0.45 154.26 4346.14 4278.64 -13.07 12.94 5959644.21 664517.22 GCT-MS 4360.30 0.47 153.53 4360.24 4292.74 -13.18 12.99 5959644.11 664517.27 GCT-MS 4374.80 0.45 153.57 4374.74 4307.24 -13.28 13.04 5959644.01 664517.33 GCT-MS 4389.30 0.45 153.92 4389.24 4321.74 -13.38 13.09 5959643.91 664517.38 GCT-MS 4403.60 0.43 155.26 4403.54 4336.04 -13.48 13.14 5959643.81 664517.43 GCT-MS 4418.10 0.40 153.03 4418.04 4350.54 -13.58 13.18 5959643.72 664517.48 GCT-MS 4432.20 0.40 147.39 4432.14 4364.64 -13.66 13.23 5959643.63 664517.53 GCT-MS 4447.00 0.38 144.46 4446.94 4379.44 -13.75 13.29 5959643.55 664517.59 GCT-MS 4461.20 0.38 146.42 4461.14 4393.64 -13.82 13.34 5959643.47 664517.64 GCT-MS 4475.50 0.38 147.01 4475.44 4407.94 -13.90 13.40 5959643.40 664517.69 GCT-MS 4490.10 0.38 143.72 4490.04 4422.54 -13.98 13.45 5959643.32 664517.75 GCT-MS 4504.50 0.38 140.96 4504.44 4436.94 -14.06 13.51 5959643.24 664517.81 GCT-MS 4518.70 0.38 139.13 4518.64 4451.14 -14.13 13.57 5959643.17 664517.87 GCT-MS 4533.00 0.42 135.29 4532.94 4465.44 -14.20 13.64 5959643.10 664517.94 GCT-MS 4547.20 0.52 137.31 4547.14 4479.64 -14.29 13.72 5959643.02 664518.03 GCT-MS 4561.70 0.58 141.05 4561.64 4494.14 -14.39 13.81 5959642.91 664518.12 GCT-MS 4576.20 0.55 138.57 4576.14 4508.64 -14.50 13.90 5959642.81 664518.21 GCT-MS 4590.50 0.53 137.54 4590.44 4522.94 -14.60 13.99 5959642.71 664518.31 GCT-MS 4605.00 0.57 134.20 4604.94 4537.44 -14.70 14.09 5959642.61 664518.40 GCT-MS 4619.70 0.60 125.76 4619.64 4552.14 -14.80 14.20 5959642.52 664518.52 GCT-MS 4634.00 0.65 118.11 4633.93 4566.43 -14.88 14.33 5959642.44 664518.66 GCT-MS 4648.30 0.73 112.25 4648.23 4580.73 -14.95 14.49 5959642.37 664518.81 GCT-MS 4662.60 0.82 107.75 4662.53 4595.03 -15.02 14.67 5959642.31 664519.00 GCT-MS 4677.10 0.88 105.96 4677.03 4609.53 -15.08 14.88 5959642.25 664519.20 GCT-MS 4691.10 0.90 105.56 4691.03 4623.53 -15.14 15.09 5959642.20 664519.41 GCT-MS 4705.00 0.90 104.84 4704.93 4637,43 -15.20 15.30 5959642.14 664519.63 GCT-MS 4719.10 0.90 104.01 4719.03 4651.53 -15.25 15.51 5959642.09 664519.84 GCT-MS 4733.60 0.93 103.85 4733.52 4666,02 -15.31 15.74 5959642.04 664520.07 GCT-MS 4747.90 0.93 103.36 4747.82 4680.32 -15.36 15.96 5959641.99 664520.29 GCT-MS 4761.80 0.92 101.76 4761.72 4694.22 -15.41 16.18 5959641.95 664520.51 GCT-MS 4776.30 0.92 99.50 4776.22 4708.72 -15.45 16.41 5959641.91 664520.74 GCT-MS 4790.30 0.95 99.10 4790.22 4722.72 -15.49 16.64 5959641.88 664520.97 GCT-MS 4804.50 0.98 101.90 4804.41 4736.91 -15.53 16.87 5959641.84 664521.21 GCT-MS 4818.60 0.98 104.58 4818.51 4751.01 -15.59 17.11 5959641.79 664521.44 GCT-MS 4832.90 0.98 105.61 4832.81 4765.31 -15.65 17.34 5959641.73 664521.68 GCT-MS 4847.20 1.00 106.55 4847.11 4779.61 -15.72 17.58 5959641.67 664521.92 GCT-MS 4861.70 1.02 107.15 4861.61 4794.11 -15.80 17.82 5959641.60 664522.16 GCT-MS 4876.20 1.03 106.61 4876.10 4808.60 -15.87 18.07 5959641.53 664522.41 GCT-MS 4890.40 1.03 105.87 4890.30 4822.80 -15.94 18.32 5959641.46 664522.66 GCT-MS 4904.50 1.02 105.85 4904.40 4836.90 -16.01 18.56 5959641.40 664522.90 GCT-MS 4918.90 1.02 106.48 4918.80 4851.30 -16.08 18.81 5959641.33 664523.15 GCT-MS 4933.10 1.03 106.69 4932.99 4865.49 -16.16 19.05 5959641.27 664523.40 GCT-MS 4947.60 1.03 106.33 4947.49 4879.99 -16.23 19.30 5959641.20 664523.65 GCT-MS 4962.10 1.05 105.61 4961.99 4894.49 -16.30 19.55 5959641.13 664523.90 GCT-MS Halliburton Company Survey Report Company: BP Amoco Date: 5/25/2006 Time: 13:49.05 Page: S ' Fic1d: Prudhoe Bay Co-ordinate(NE)Reference: Well: C-34, True Noiih Site: PB C Pad Vertical (TVD) Reference: 41:34 2/22 /1948 00:00 67.5 ~~'cll: C-3 4 Section (VS) Reference: Well (O OON_ O OOE10390 Azi) ~~ dlpo-ith: C-3 4A Survey Calcu lation Method: Minimum Cu rvature Db: Oracle Surccv dill [ncl Azim TVD Sv~ti 7VD N/S E/W M1tap~ Map F, 'f'ool tt deg deg ft ft ft ft ft ft 4976.70 1.08 103.57 4976.59 4909.09 -16.37 19.82 5959641.07 664524.17 GCT-MS 4990.80 1.23 96.26 4990.68 4923.18 -16.42 20.09 5959641.03 664524.45 GCT-MS 5005.30 1.67 85.61 5005.18 4937.68 -16.42 20.46 5959641.03 664524.81 GCT-MS 5019.40 2.15 77.88 5019.27 4951.77 -16.35 20.92 5959641.12 664525.27 GCT-MS 5033.40 2.63 70.40 5033.26 4965.76 -16.18 21.48 5959641.29 664525.83 GCT-MS 5047.60 3.15 63.87 5047.44 4979.94 -15.90 22.14 5959641.59 664526.48 GCT-MS 5062.00 3.58 60.31 5061.82 4994.32 -15.51 22.89 5959642.00 664527.22 GCT-MS 5076.20 4.08 57.30 5075.98 5008.48 -15.01 23.70 5959642.51 664528.02 GCT-MS 5090.60 5.03 54.12 5090.34 5022.84 -14.37 24.64 5959643.18 664528.94 GCT-MS 5104.50 6.02 52.08 5104.17 5036.67 -13.56 25.71 5959644.01 664530.00 GCT-MS 5119.40 6.60 51.18 5118.98 5051.48 -12.55 26.99 5959645.05 664531.26 GCT-MS 5137.40 7.17 51.16 5136.85 5069.35 -11.19 28.67 5959646.44 664532.91 GCT-MS 5152.50 7.83 51.96 5151.83 5084.33 -9.97 30.22 5959647.70 664534.42 GCT-MS 5162.60 8.35 52.42 5161.82 5094.32 -9.10 31.34 5959648.59 664535.53 GCT-MS 5165.60 8.48 52.48 5164.79 5097.29 -8.83 31.69 5959648.87 664535.87 GCT-MS 5167.00 8.53 52.54 5166.18 5098.68 -8.70 31.85 5959649.00 664536.03 GCT-MS 5183.80 9.45 53.59 5182.77 5115.27 -7.13 33.95 5959650.62 664538.10 GCT-MS 5204.20 10.60 54.13 5202.86 5135.36 -5.03 36.82 5959652.78 664540.92 GCT-MS 5225.50 11.73 53.65 5223.76 5156.26 -2.60 40.15 5959655.28 664544.19 GCT-MS 5247.50 12.85 52.53 5245.25 5177.75 0.21 43.89 5959658.17 664547.87 GCT-MS 5270.60 13.93 51.24 5267.72 5200.22 3.52 48.10 5959661.57 664552.01 GCT-MS 5296.10 15.02 50.26 5292.41 5224.91 7.55 53.03 5959665.71 664556.85 GCT-MS 5322.30 15.88 49.71 5317.67 5250.17 12.04 58.38 5959670.31 664562.10 GCT-MS 5350.10 16.65 49.46 5344.35 5276.85 17.09 64.31 5959675.49 664567.91 GCT-MS 5378.30 17.33 49.52 5371.32 5303.82 22.44 70.57 5959680.98 664574.06 GCT-MS 5406.90 17.97 49.74 5398.58 5331.08 28.06 77.18 5959686.74 664580.54 GCT-MS 5435.30 18.57 49.97 5425.54 5358.04 33.80 83.99 5959692.62 664587.22 GCT-MS 5464.00 19.23 50.21 5452.70 5385.20 39.76 91.12 5959698.74 664594.22 GCT-MS 5493.00 20.03 50.44 5480.01 5412.51 45.98 98.61 5959705.12 664601.58 GCT-MS 5521.50 20.82 50.60 5506.72 5439.22 52.30 106.29 5959711.61 664609.11 GCT-MS 5550.20 21.58 50.84 5533.48 5465.98 58.87 114.33 5959718.36 664617.00 GCT-MS 5578.50 22.33 51.30 5559.72 5492.22 65.52 122.56 5959725.18 664625.08 GCT-MS 5606.40 23.12 51.97 5585.46 5517.96 72.21 131.01 5959732.06 664633.39 GCT-MS 5635.20 23.95 52.71 5611.86 5544.36 79.24 140.11 5959739.28 664642.33 GCT-MS 5663.50 24.78 53.34 5637.64 5570.14 86.26 149.44 5959746.50 664651.51 GCT-MS 5692.30 25.70 53.86 5663.69 5596.19 93.54 159.33 5959754.00 664661.23 GCT-MS 5720.30 26.55 54.20 5688.83 5621.33 100.78 169.30 5959761.46 664671.04 GCT-MS 5749.20 27.25 54.50 5714.60 5647.10 108.40 179.93 5959769.31 664681.50 GCT-MS 5777.50 27.88 54.81 5739.69 5672.19 115.98 190.61 5959777.12 664692.01 GCT-MS 5806.00 28.35 54.96 5764.83 5697.33 123.71 201.60 5959785.08 664702.83 GCT-MS 5834.50 28.62 54.94 5789.88 5722.38 131.51 212.72 5959793.13 664713.78 GCT-MS 5862.60 28.83 54.92 5814.52 5747.02 139.27 223.78 5959801.13 664724.66 GCT-MS 5891.50 28.87 54.90 5839.83 5772.33 147.29 235.19 5959809.39 664735.89 GCT-MS 5920.40 28.87 54.90 5865.14 5797.64 155.31 246.60 5959817.66 664747.13 GCT-MS 5949.30 28.95 54.95 5890.44 5822.94 163.34 258.04 5959825.94 664758.38 GCT-MS 5976.80 29.05 55.02 5914.49 5846.99 170.99 268.96 5959833.82 664769.13 GCT-MS 6005.70 29.00 55.07 5939.76 5872.26 179.02 280.45 5959842.11 664780.44 GCT-MS 6034.20 28.78 55.01 5964.71 5897.21 186.91 291.73 5959850.24 664791.55 GCT-MS 6062.50 28.67 54.93 5989.53 5922.03 194.72 302.87 5959858.29 664802.52 GCT-MS 6090.30 28.68 54.91 6013.92 5946.42 202.39 313.79 5959866.19 664813.26 GCT-MS 6118.90 28.67 54.90 6039.01 5971.51 210.28 325.02 5959874.33 664824.31 GCT-MS 6147.10 28.67 54.78 6063.76 5996.26 218.07 336.08 5959882.36 664835.20 GCT-MS Halliburton Company Survey Report Company: BP Amoco Date: 5/25/2006 I~inre: 13:49:05 Page: 9 Field: Pru dhoe Bay Co-ordinate(NE) Re[erence: Well: C-34, True North Site PB C Pad Vertical (TVD ) Reference: 41:34 2/22/ 1988 00:00 67.5 Well: C-3 4 Section (VS) Reference: Well (O.OON,O.OOE,103.90~Azi) Wellpath: C-3 4A Survey Calcu lation Method: Minimum Cu rvature Db: Oracle Suncv MD Incl Azim TVD SysTVD NlS E/W ti1ap,V MapE Tool ft deg deg ft ft ft ft ft ft 6175.20 28.67 54.73 6088.41 6020.91 225.85 347.09 5959890.37 664846.04 GCT-MS 6203.90 28.57 54.74 6113.61 6046.11 233.78 358.31 5959898.55 664857.08 GCT-MS 6232.10 28.45 54.84 6138.39 6070.89 241.55 369.31 5959906.55 664867.91 GCT-MS 6259.90 28.38 54.92 6162.84 6095.34 249.16 380.13 5959914.40 664878.56 GCT-MS 6287.60 28.27 54.93 6187.22 6119.72 256.71 390.89 5959922.18 664889.15 GCT-MS 6316.10 28.07 54.96 6212.34 6144.84 264.44 401.90 5959930.15 664899.99 GCT-MS 6344.00 27.87 54.93 6236.99 6169.49 271.95 412.61 5959937.90 664910.53 GCT-MS 6372.20 27.73 54.99 6261.93 6194.43 279.50 423.38 5959945.68 664921.13 GCT-MS 6400.40 27.53 55.10 6286.91 6219.41 287.00 434.10 5959953.41 664931.68 GCT-MS 6428.70 27.35 55.15 6312.03 6244.53 294.45 444.80 5959961.10 664942.22 GCT-MS 6456.70 27.15 55.21 6336.92 6269.42 301.77 455.32 5959968.65 664952.58 GCT-MS 6485.30 26.92 55.29 6362.40 6294.90 309.18 466.00 5959976.29 664963.09 GCT-MS 6513.40 26.68 55.49 6387.48 6319.98 316.38 476.43 5959983.71 664973.36 GCT-MS 6541.70 26.53 55.66 6412.78 6345.28 323.54 486.89 5959991.10 664983.65 GCT-MS 6570.10 26.42 55.80 6438.20 6370.70 330.67 497.35 5959998.46 664993.96 GCT-MS 6598.30 26.18 56.03 6463.49 6395.99 337.68 507.70 5960005.68 665004.15 GCT-MS 6626.30 26.02 56.29 6488.63 6421.13 344.54 517.93 5960012.77 665014.23 GCT-MS 6654.40 26.05 56.56 6513.88 6446.38 351.36 528.20 5960019.81 665024.35 GCT-MS 6681.70 26,12 56.80 6538.40 6470.90 357.95 538.23 5960026.62 665034.23 GCT-MS 6709.50 26.13 57.04 6563.36 6495.86 364.63 548.49 5960033.52 665044.34 GCT-MS 6737.80 26.23 57.30 6588.75 6521.25 371.40 558.98 5960040.52 665054.68 GCT-MS 6765.10 26.30 57.54 6613.24 6545.74 377.91 569.16 5960047.25 665064.72 GCT-MS 6792.60 26.30 57.89 6637.89 6570.39 384.41 579.46 5960053.98 665074.87 GCT-MS 6821.00 26.32 58.20 6663.35 6595.85 391.08 590.14 5960060.87 665085.40 GCT-MS 6848.70 26.38 58.36 6688.17 6620.67 397.54 600.60 5960067.56 665095.72 GCT-MS 6876.30 26.40 58.60 6712.89 6645.39 403.95 611.06 5960074.20 665106.03 GCT-MS 6904.30 26.32 58.93 6737.98 6670.48 410.40 621.69 5960080.88 665116.52 GCT-MS 6933.30 26.23 59.24 6763.99 6696.49 417.00 632.70 5960087.72 665127.38 GCT-MS 6961.10 26.15 59.49 6788.93 6721.43 423.25 643.26 5960094.20 665137.80 GCT-MS 6989.00 26.07 59.73 6813.98 6746.48 429.46 653.85 5960100.64 665148.25 GCT-MS 7017.80 25.92 60.07 6839.87 6772.37 435.79 664.77 5960107.21 665159.03 GCT-MS 7045.50 25.87 60.49 6864.79 6797.29 441.79 675.28 5960113.43 665169.40 GCT-MS 7073.40 25.83 60.73 6889.90 6822.40 447.76 685.88 5960119.63 665179.87 GCT-MS 7101.90 25.62 60.88 6915.57 6848.07 453.79 696.68 5960125.90 665190.53 GCT-MS 7131.30 25.45 61.24 6942.10 6874.60 459.92 707.77 5960132.27 665201.48 GCT-MS 7159.00 25.32 61.52 6967.13 6899.63 465.61 718.19 5960138.19 665211.78 GCT-MS 7186.70 25.17 61.83 6992.18 6924.68 471.22 728.59 5960144.02 665222.05 GCT-MS 7215.10 25.05 62.34 7017.90 6950.40 476.86 739.24 5960149.89 665232.57 GCT-MS 7243.40 25.00 62.81 7043.54 6976.04 482.37 749.87 5960155.64 665243.08 GCT-MS 7272.00 25.08 63.26 7069.45 7001.95 487.86 760.65 5960161.36 665253.74 GCT-MS 7299.40 25.23 63.79 7094.25 7026.75 493.05 771.08 5960166.78 665264.05 GCT-MS 7326.30 25.38 64.28 7118.57 7051.07 498.09 781.42 5960172.04 .665274.27 GCT-MS 7353.50 25.52 64.68 7143.13 7075.63 503.12 791.97 5960177.30 665284.71 GCT-MS 7381.40 25.63 65.23 7168.30 7100.80 508.22 802.88 5960182.64 665295.51 GCT-MS 7409.10 25.83 65.74 7193.25 7125.75 513.21 813.82 5960187.87 665306.33 GCT-MS 7435.90 25.97 66.08 7217.36 7149.86 517.99 824.51 5960192.88 665316.91 GCT-MS 7463.10 26.02 66.42 7241.81 7174.31 522.79 835.42 5960197.91 665327.72 GCT-MS 7490.70 26.07 66.73 7266.61 7199.11 527.61 846.54 5960202.97 665338.73 GCT-MS 7518.10 26.00 66.95 7291.23 7223.73 532.34 857.59 5960207.94 665349.68 GCT-MS 7545.50 25.93 67.25 7315.86 7248.36 537.01 868.65 5960212.85 665360.62 GCT-MS 7572.40 25.92 67.78 7340.05 7272.55 541.51 879.51 5960217.59 665371.39 GCT-MS 7600.10 25.98 68.32 7364.96 7297.46 546.04 890.75 5960222.36 665382.53 GCT-MS 7627.50 26.10 68.79 7389.58 7322.08 550.43 901.95 5960227.00 665393.62 GCT-MS Halliburton Company Survey Report `; Company: BP Amoco Field: Prudhoe Bay Date 5!25'200E Co-ordinatc(~AEl 12c(crence: "Time: '13 49.05 Pa~~~: 10 Well. C-~4. l"rue North Site: PB C Pad Vertical (TVD) ttcfcrcnce: 41:34 2,'22,1 1988 00:00 67.5 I Well: C-34 Section (VS) Reference: Well (O.OON, O.OOE,103.90.4zi) Wcllpath: C-34A Survey Calculation ltcthod: Minimum Cu rvature Db: Oracle Survcv Ml) Incl Azim TVD S_cs "Ib~D \/S E/W MapN MapE Tool ft deg deg ft rt it ft ft ft 7654.30 26.13 69.39 7413.64 7346.14 554.64 912.97 5960231.45 665404.55 GCT-MS 7681.50 26.00 70.05 7438.08 7370.58 558.79 924.18 5960235.84 665415.66 GCT-MS 7708.70 25.80 70.56 7462.55 7395.05 562.79 935.37 5960240.09 665426.76 GCT-MS 7736.00 25.67 70.85 7487.14 7419.64 566.71 946.55 5960244.25 665437.86 GCT-MS 7764.20 25.48 70.94 7512.58 7445.08 570.69 958.06 5960248.48 665449.27 GCT-MS 7791.50 25.33 70.94 7537.24 7469.74 574.52 969.13 5960252.55 665460.25 GCT-MS 7819.19 25.27 70.89 7562.27 7494.77 578.39 980.31 5960256.66 665471.35 GCT-MS 7846.70 24.92 70.72 7587.18 7519.68 582.22 991.33 5960260.74 665482.28 GCT-MS 7873.20 24.47 70.62 7611.26 7543.76 585.89 1001.78 5960264.63 665492.64 GCT-MS 7900.10 24.22 70.68 7635.77 7568.27 589.56 1012.24 5960268.53 665503.02 GCT-MS 7927.20 24.15 70.90 7660.49 7592.99 593.21 1022.72 5960272.41 665513.42 GCT-MS 7953.70 24.23 71.00 7684.66 7617.16 596.76 1032.99 5960276.18 665523.61 GCT-MS 7981.40 24.07 70.96 7709.94 7642.44 600.45 1043.70 5960280.11 665534.24 GCT-MS 8008.80 23.78 71.17 7734.98 7667.48 604.06 1054.21 5960283.94 665544.66 GCT-MS 8035.90 23.82 71.39 7759.78 7692.28 607.57 1064.57 5960287.68 665554.94 GCT-MS 8063.50 " 23.83 71.54 7785.03 7717.53 611.11 1075.14 5960291.45 665565.43 GCT-MS 8091.10 23.77 71.64 7810.28 7742.78 614.63 1085.71 5960295.20 665575.92 GCT-MS 8118.00 23.83 71.69 7834.89 7767.39 618.04 1096.01 5960298.84 665586.15 GCT-MS 8144.80 23.83 71.86 7859.41 7791.91 621.43 1106.30 5960302.45 665596.35 GCT-MS 8172.10 23.58 72.20 7884.40 7816.90 624.82 1116.74 5960306.06 665606.72 GCT-MS 8199.50 23.33 72.60 7909.54 7842.04 628.11 1127.13 5960309.59 665617.04 GCT-MS 8226.90 23.35 72.87 7934.70 7867.20 631.34 1137.50 5960313.04 665627.33 GCT-MS 8253.70 23.43 73.10 7959.29 7891.79 634.45 1147.67 5960316.37 665637.43 GCT-MS 8280.60 23.47 73.47 7983.97 7916.47 637.53 1157.92 5960319.67 665647.61 GCT-MS 8306.20 23.58 73.89 8007.45 7939.95 640.40 1167.73 5960322.76 665657.35 GCT-MS 8327.29 23.88 73.95 8026.75 7959.25 642.75 1175.89 5960325.29 665665.45 GCT-MS 8344.70 24.23 73.39 8042.65 7975.15 644.74 1182.70 5960327.43 665672.22 GCT-MS 8360.90 24.52 72.15 8057.41 7989.91 646.73 1189.08 5960329.55 665678.56 GCT-MS 8377.00 24.80 70.59 8072.04 8004.54 648.87 1195.45 5960331.84 665684.87 GCT-MS 8393.40 25.15 69.29 8086.90 8019.40 651.25 1201.95 5960334.35 665691.32 GCT-MS 8409.00 25.57 68.30 8101.00 8033.50 653.66 1208.18 5960336.91 665697.50 GCT-MS 8424.60 26.02 67.28 8115.05 8047.55 656.23 1214.46 5960339.61 665703.72 GCT-MS 8439.40 26.37 66.21 8128.33 8060.83 658.81 1220.46 5960342.32 665709.67 GCT-MS 8454.20 26.77 65.29 8141.56 8074.06 661.53 1226.50 5960345.17 665715.64 GCT-MS 8469.00 27.13 64.83 8154.76 8087.26 664.36 1232.58 5960348.13 665721.66 GCT-MS 8483.50 27.33 64.70 8167.65 8100.15 667.19 1238.58 5960351.09 665727.60 GCT-MS 8498.29 27.52 64.77 8180.78 8113.28 670.09 1244.74 5960354.13 665733.69 GCT-MS 8513.00 27.73 64.95 8193.81 8126.31 672.99 1250.92 5960357.16 665739.80 GCT-MS 8527.50 28.03 64.97 8206.63 8139.13 675.86 1257.06 5960360.17 665745.88 GCT-MS 8542.50 28.25 64.90 8219.85 8152.35 678.86 1263.47 5960363.30 665752.22 GCT-MS 8560.60 28.47 65.05 8235.78 8168.28 682.50 1271.26 5960367.11 665759.93 GCT-MS 8580.90 28.82 65.32 8253.60 8186.10 686.58 1280.09 5960371.38 665768.67 GCT-MS 8603.70 29.20 65.63 8273.54 8206.04 691.17 1290.15 5960376.19 665778.63 GCT-MS 8630.90 29.77 66.01 8297.21 8229.71 696.65 1302.37 5960381.94 665790.72 GCT-MS 8657.80 30.28 66.36 8320.50 8253.00 702.09 1314.68 5960387.64 665802.91 GCT-MS 8685.00 30.72 66.75 8343.94 8276.44 707.58 1327.35 5960393.41 665815.45 GCT-MS 8712.50 31.15 67.12 8367.53 8300.03 713.12 1340.35 5960399.23 665828.33 GCT-MS 8740.80 31.62 67.29 8391.69 8324.19 718.83 1353.94 5960405.24 665841.79 GCT-MS 8768.00 32.05 67.27 8414.80 8347.30 724.37 1367.17 5960411.07 665854.90 GCT-MS 8796.10 32.25 67.16 8438.59 8371.09 730.16 1380.96 5960417.16 665868.55 GCT-MS 8823.79 32.33 67.09 8462.00 8394.50 735.91 1394.59 5960423.21 665882.05 GCT-MS 8851.10 32.37 67.07 8485.07 8417.57 741.60 1408.05 5960429.19 665895.38 GCT-MS ' ~ Halliburton Company Survey Report Company: BP Amoco Date: 5/25/2006 Timc: 1 c~ 49 05 Pagc: 11 Field: Prudhoe Bay Co-ordinate(v E) Reference: lh~ell C-34. True North Site: PB C Pad Well: C-34 Vertical ('1'VD) Refereuce: Section (VS) Keference: 41:34 2/22%1988 00:00 67.5 Well {O.OON,O.OOE,103-OOAzi) ~ vi'ellpath: C-34A Survev Calculation Method: Minimum Cu rvature Uh: Oracle Survey - - MD lncl Azim 'CVll - SysTVD - 1V'!S _ _ E/W --- _ MapN ~lapE': ___ _ -- Tool ft deg deg ft ft ft ft ft it I 8878.29 32.20 67.02 8508.05 8440.55 747.26 1421.42 5960435.14 665908.63 GCT-MS 8905.80 32.05 66.90 8531.35 8463.85 752.99 1434.88 5960441.16 665921.96 GCT-MS 8933.50 32.00 66.74 8554.84 8487.34 758.77 1448.39 5960447.24 665935.33 GCT-MS 8961.60 32.08 66.64 8578.66 8511.16 764.67 1462.08 5960453.44 665948.89 GCT-MS 8990.40 32.32 66.60 8603.03 8535.53 770.76 1476.16 5960459.83 665962.84 GCT-MS 9017.70 32.37 66.51 8626.09 8558.59 776.57 1489.56 5960465.93 665976.11 GCT-MS 9045.50 32.40 66.50 8649.57 8582.07 782.51 1503.22 5960472.17 665989.63 GCT-MS 9073.00 32.53 66.41 8672.77 8605.27 788.41 1516.75 5960478.36 666003.03 GCT-MS 9100.60 32.47 66.34 8696.05 8628.55 794.35 1530.34 5960484.60 666016.48 GCT-MS 9126.99 32.35 66.32 8718.33 8650.83 800.03 1543.29 5960490.56 666029.31 GCT-MS 9154.10 32.27 66.18 8741.24 8673.74 805.86 1556.56 5960496.68 666042.44 GCT-MS 9181.20 32.13 66.14 8764.17 8696.67 811.70 1569.76 5960502.81 666055.51 GCT-MS 9209.20 32.00 66.12 8787.90 8720.40 817.71 1583.36 5960509.12 666068.97 GCT-MS 9236.10 31.87 66.05 8810.73 8743.23 823.48 1596.37 5960515.17 666081.85 GCT-MS 9263.00 31.82 65.89 8833.58 8766.08 829.26 1609.33 5960521.23 666094.68 GCT-MS 9290.10 31.73 65.81 8856.62 8789.12 835.10 1622.35 5960527.35 666107.57 GCT-MS 9317.60 31.72 65.79 8880.01 8812.51 841.03 1635.54 5960533.57 666120.63 GCT-MS 9343.00 31.77 65.67 8901.61 8834.11 846.52 1647.72 5960539.32 666132.69 MWD 9373.87 39.02 79.42 8926.79 8859.29 851.67 1664.73 5960544.84 666149.57 MWD 9405.38 44.57 90.47 8950.31 8882.81 853.40 1685.58 5960547.03 666170.38 MWD 9453.85 52.07 103.11 8982.59 8915.09 848.91 1721.34 5960543.32 666206.23 MWD 9485.44 60.91 113.68 9000.05 8932.55 840.51 1746.21 5960535.47 666231.27 MWD 9513.62 64.34 125.28 9013.04 8945.54 828.19 1767.92 5960523.63 666253.25 MWD 9559.68 76.73 132.48 9028.38 8960.88 800.93 1801.57 5960497.11 666287.48 MWD 9590.80 78.66 144.96 9035.03 8967.53 778.12 1821.57 5960474.75 666307.98 MWD 9613.28 83.93 150.76 9038.44 8970.94 759.31 1833.38 5960456.21 666320.19 MWD 9647.65 91.85 154.46 9039.70 8972.20 728.85 1849.16 5960426.09 666336.64 MWD 9677.35 95.45 163.42 9037.81 8970.31 701.22 1859.80 5960398.71 666347.88 MWD 9707.12 94.92 171.68 9035.11 8967.61 672.30 1866.19 5960369.93 666354.90 MWD 9737.20 93.78 178.19 9032.83 8965.33 642.44 1868.83 5960340.14 666358.20 MWD 9770.96 91.58 178.89 9031.25 8963.75 608.73 1869.69 5960306.46 666359.79 MWD 9807.43 92.11 187.33 9030.07 5962.57 572.36 1867.72 5960270.06 666358.61 MWD 9839.12 90.88 190.32 9029.25 8961.75 541.06 1862.86 5960238.67 666354.44 MWD 9871.52 90.04 199.88 9028.99 8961.49 509.82 1854.43 5960207.25 666346.70 MWD 9903.84 89.96 205.70 9028.99 8961.49 480.03 1841.91 5960177.20 666334.84 MWD 9933.11 89.34 206.76 9029.16 8961.66 453.78 1828.98 5960150.67 666322.48 MWD 9981.94 89.87 213.63 9029.50 8962.00 411.60 1804.43 5960107.97 666298.87 MWD 10013.22 90.66 216.98 9029.36 8961.86 386.08 1786.36 5960082.06 666281.36 MWD 10045.30 91.28 223.32 9028.81 8961.31 361.57 1765.69 5960057.11 666261.23 MWD 10080.52 90.84 229.14 9028.16 8960.66 337.22 1740.27 5960032.21 666236.35 MWD 10121.68 90.57 231.95 9027.65 8960.15 311.07 1708.50 5960005.37 666205.16 MWD 10155.67 90.66 239.00 9027.29 8959.79 291.82 1680.51 5959985.51 666177.60 MWD 10187.37 88.72 241.12 9027.46 8959.96 276.00 1653.04 5959969.10 666150.49 MWD 10236.18 88.81 249.40 9028.51 8961.01 255.60 1608.76 5959947.73 666106.67 MWD 10276.85 89.96 257.51 9028.95 8961.45 244.03 1569.81 5959935.31 666067.99 MWD 10313.12 89.25 259.97 9029.20 8961.70 236.95 1534.24 5959927.45 666032.58 MWD 10354.36 89.25 258.21 9029.74 8962.24 229.14 1493.76 5959918.76 665992.28 MWD 10382.58 92.16 255.74 9029.39 8961.89 222.78 1466.27 5959911.81 665964.94 MWD 10414.61 90.48 249.22 9028.66 8961.16 213.15 1435.75 5959901.51 665934.64 MWD 10447.52 89.52 244.99 9028.66 8961.16 200.35 1405.44 5959888.05 665904.62 MWD 10478.87 89.52 242.70 9028.92 8961.42 186.53 1377.30 5959873.62 665876.79 MWD 10510.47 91.45 236.89 9028.65 8961.15 170.64 1350.01 5959857.13 665849.85 MWD 10549.52 89.16 232.66 9028.44 8960.94 148.12 1318.12 5959833.93 665818.47 MWD Halliburton Company Survey Report Company: BP Amoco llate: 5/25/2006 Timc: 13.49:0.5 Page: 12 Field: Prudhoe Bay Co-ordinate(NE}Reference: Well: C-34. True North Site: PB C Pad Vertical (TW) Reference: 41 : ~4 2122!1988 00:00 67.5 ~~cll: C; ~4 Section (VS) Reference: Well (O.DON,O.OOE,10~3 9DAzi) ~~ cllparh: C-34A Survey Calculation Method: Minimum Curvature L)h: Orade Sung ~~11) Incl Azim TVD Sys "1Vll ft deg deg ft ft 10597.05 88.90 230.72 9029.25 8961.75 10633.00 89.96 225.44 9029.61 8962.11 10668.00 88.46 223.67 9030.09 8962,59 10700.83 87.40 219.27 9031.27 8963,77 10749.57 89.52 211.69 9032.59 8965.09 10791.16 88.19 206.93 9033.42 8965.92 10852.32 90.57 204.47 9034.08 8966.58 10894.21 90.13 199.18 9033.82 8966.32 10920.19 89.78 194.60 9033.84 8966.34 10958.65 90.57 191.07 9033.73 8966.23 10988.08 92.25 183.85 9033.00 8965.50 11011.22 92.16 181.03 9032.11 8964.61 11043.00 92.16 181.03 9030.91 8963.41 118.66 1280.83 5959803.66 94.66 1254.09 5959779.08 69.72 1229.54 5959753.61 45.14 1207.82 5959728.57 5.50 1179.56 5959685.31 -30.75 1159.21 5959651.63 -85.85 1132.70 5959595.97 -124.72 1117.13 5959556.77 -149.57 1109.58 5959531.76 -187.07 1101.04 5959494.09 -216.22 1097.22 5959464.86 -239.32 1096.24 5959441.75 -271.07 1095.67 5959410.00 NIapE Tool ft 665781.84 MWD 665755.63 MWD 665731.63 MWD 665710.46 MWD 665683.08 MWD 665663.53 MWD 665638.22 MWD 665623.51 MWD 665616.51 MWD 665608.79 MWD 665605.61 MWD 665605.14 MWD 665605.26 PROJECTED N/S E/W MapN ft ft ft TR6F = 6" CMJ WELLHEAD = McEVOY ACTUATOR = OTIS KB. ELEV = 67.51' BF. ElEV = 38.63' KOP = 9343' Max Angle = 95.45° @ 9677' Datum MD = 9303' Datum ND = 8800' SS C-34A FROM CTD/DRLG -DRAFT 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" TOP OF 4-1/2" TBG 13-3/8" CSG, 72#, L-80, ID = 12.347" 2491' 2491' 2684' Minimum ID = 2.37" @ 9983' 2-7/8" STL LNR TOP OF 7" LNR ~--~ $46( TOP OF 3-1/2" X 3-3/16" X 2-7/8" LNR 8489' (CNL: 84 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 8536' 3-1!2" X 3-3116" X-OVER 8538' 9-5/8" CSG, 47#, L-80, ID = 8.681" 8762' EST TOP OF LINER CEMENT 9100' MECHANICAL WHIPSTOCK ~-j 9343' WINDOW 9347' - 9354' RA PIP TAG 9353' PERFORATION SUMMA REF LOG: MCNL/CCL/GR OF TIE-IN LOG: GEOLOGY PDG LOG ANGLEAT TOP PERF: 91.1° @ 10060' Note: Refer to Production DB for historical per' lnl. SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10060' - 11000' Opn OS/12i0!;S PBTD 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9620' 9663' SAFETY NOTES: 2157' 5-1/2" SSSV, OTIS HRO LANDING NIP, ID = 4.562" 2157' 5-1/2" PRO PLUG (05/24/06) 2491' S" X 4-112" XO GAS I IFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 5 3090 3022 0 OTIS-LBD DOM RM 16 05/23/06 4 5086 5018 5 OTIS-LBD SO RM 20 05/23/06 3 7003 6759 26 OTIS-LBD DMY RA 0 2 7975 7637 24 OTIS-LBD DMY RA 0 1 8279 7915 23 OTIS-LBD DMY RA 0 8356' 4-1/2" BAKER L SLIDING SLEEVE ID = 3.813" 8416' TMJ SBR SEAL ASSY 8431' 9-5/8' X 4-1 /2" TM/ HBBP PKR, ID = 3.958" $473' 4-1/2" OTIS X NIP, ID = 3.813" 8489' BOT DEPLOY SLEEVE 6' LONG.. 3" ID 8506' 4-1/2" OTIS XN NIP, f"I , ~="'- "~ 3.80" ID 8509' 3-1/2" X NIP, ID = 2.813" 8536' 4-112" TTL W/TM/ SOS, ID = 3.958" $540' ELMD TT LOGGED 04/17/88 9150' -i MARKER JOINT gg$3' LSL SUB. 3-3 16 x 2-7/8 X-OVER 11008' fCNL: 11014'1 PBTD 3-1/2" X & PERFED H 11043' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/10/88 ORIGINAL COMPLETION WELL: G34A 07/03/03 CMO/TLP MAX ANGLE CORRECTION PERMfr No: 206-037 09/15/03 CMO/TLP DATUM MD 8 PERF ANGLE API Na: 50-029-21785-01 05112/06 JUE NORDIC-1 CTD SIDETRACK SEC 19, T11 N, R14E, 1565' SNL & 882' WEL 05/24/06 RCT/PJC PRO PLUG @ 2157' 05/23!06 RCT/PJC GLV GO BP Exploration (Alaska) • } 111 ~ ~ j °°®9 ~' f ~ 1 r 1 ~_ ALASSA OIL A1QD COI~TSERQATI011T COMIrII5SIOI~T Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, PBU C34A BP Exploration (Alaska) Inc. Permit No: 206-037 Surface Location: 1565' FNL, 882' FEL, SEC. 19, T11 N, R 14E, UM Bottomhole Location: 1878' FNL, 120' FWL, SEC. 20, Tl 1N, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Cathy . Foerster Commissioner DATED this~~day of March, 2006 cc: Department of Fish & Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. FRANK H. MURKOWSKI, GOVERNOR STATE OF ALASKA ~~N fo6 ALA~OIL AND GAS CONSERVATION COM PERMIT TO DRILL q /oG 20 AAC 25.005 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service i ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is propo~~~BFa~e ^ Coalbed Methane ^ Gas Hy ales ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU C-34A ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11000 TVD 8968ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 1565' FNL 882' FEL SEC 19 T11 N R14E UM 7. Property Designation: ADL 028305 Pool , , . , , , Top of Productive Horizon: 812' FNL, 558' FWL, SEC. 20, T11N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date: d April 20, 2006 Total Depth: 1878' FNL, 120' FWL, SEC. 20, T11N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: .23,000' 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664504 - 5959657 Zone- ASP4 10. KB Elevation (Height above GL): 67.5' feet 15. Distance to Nearest Well Within Pool: 800' 16. Deviated Wells: Kickoff Depth: 9345 feet Maximum Hole Angle: 94 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3200 Surface: 2320 ` 18. Casin Pro ram: S dfications To - Settln De th -Bottom ~uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" s-~i s" x zaie' 6.2# / 6.16# L-80 STL 2515' 8485' 8169' 11000' 8968' 126 cu ft Class 'G' 19. PRESENT W ELL CONDITION S UMMARY (To be completed f or Redrill and Re-entry Operations) Total Depth MD (ft): 9674 Total Depth TVD (ft): 9182 Plugs (measured): None Effective Depth MD (ft): 9620 Effective Depth TVD (ft): 9136 Junk (measured): None -Casin Len" h Size Cement Volume MD ~ TVD Conductor /Structural 110' 20" 8 cu ds Concrete 110' 110' Surface 2685' 13-3/ "~ ~ 723 cu ft Arcticset 2685' 2685' Intermediate 8762' 9-5/8" 1206 cu ft Class'G', 575 cu ft Class'G' 8762' 8410' Liner 1203' 7" 14 cu ft Class 'G' 8460' - 9663' 8147' - 9173' Perforation Depth MD (ft): 9316' - 9509' Perforation Depth TVD (ft): 8879' - 9043' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer Prepared 9y NameMumber: Si nature L Phone 564-4387 Date 3 d6 Terrie Hubble, 564-4628 Commission Use"Only Permit To Drill Number: -Q API Number: 50-029-21785-01-00 Permit Approval Date: See cover letter for other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~No l HZS Measures:~YYes ^ No Directional Survey Req'd: ~'Ye ^ No Other: T~°S ~ loo IBC (0 ~jSO~ ~S~' .- - ~/ O APPROVED BY THE COMMISSION 3 ~ .-Q Date ,COMMISSIONER ~~CI V C6! 4 MAR 0 8 2006 Alaska Oi! & Gas Cons. C "lion Form 10-401 Revised 1{2/2005 ~ ~ Submit In Duplicate BP Prudhoe Bay C-34A CTD Sidetrac CTD Sidetrack Summary Pre-Rig Work: 1. O AC-LDS; AC-PPPOT-IC, T Done 2. S Caliper liner and tubing Done 3. S Set DGLV 4. S Run dummy whipstock drift 5. O MIT-IA, and OA. Done 6. E Set 4-1/2" x 7" Baker TTWS 7. C Mill XN nipple at 8506' with left hand motor 8. C Pump 15.8 ppg cement for abandonment - 22 bbls 9. O Bleed gas lift and production flowlines down to zero and blind flange 10. O Remove wellhouse, level pad The pre CTD work is slated to begin on April 7, 2006. Rig Work: 1. MIRU and test BOPE to 250 psi low an 3500 si high. 2. Mill 3.8" window at 9345' and 10' of rat .Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 430' (38 deg/100 planned) 4. Drill Lateral: 4.125" OH, 1225' horizontal (12 deg/100 planned), with resistivity ~ 5. MAD pass with resistivity tools in memory mode 6. Run 3-3/16" 2-7/8" solid liner leaving TOL at`~./ 7. Pump primary cement leaving TOC at 9100', 2.4 I of 15.8 ppg liner cmt planned 8. Cleanout liner and MCNL/GR/CCL log 9. Test liner lap to 2000 psi. 10. Perforate liner per asset instructions (-800') 11. Freeze protect well, RDMO Post-Rig Work: 1. Move wellhouse, Install production flowline 2. Run GLVs 3. Flowback well to separator Mud Program: • Well kill: 8.6 ppge • Milling/drilling: 6 ~pg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class lI wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCII 8485' and - 10000' and • 2-7/8", L-80 6.16# STL 10000' and - 11000' and • A minimum of 22.4 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9100' Existing casing/tubing Information 13-3/8", L-80 72#, Burst 5380, collapse 2670 psi 9 5/8", L-80 47#, Burst 6870, collapse 4750 psi 5-1/2", L-80 17#, Burst 7740, collapse 6290 psi ((I~~ 4-1/2", L-80 12.6#, Burst 8430, collapse 7500 psi )` Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. ~ • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 94 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 23,000 ft. • Distance to nearest well within pool - 800 ft. Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole CNL/GRlCCL log will be run. Hazards • The maximum recorded H2S level on C-18A is 20 ppm ~ • Lost. circulation risk is low, no fault crossings expected. Reservoir Pressure • The max res. press. is estimated to be 3200 psi at 8800'ss (7.0 ppg EMW). • Max. surface pressure with gas (0.10 psllft) to surface is 2320 psi. ~" TREE = 6" CM/ 'WELLHEPtD = McEVOY ACTUATOR = OTIS KB. ELEV - 67.51' BF. ELEV - 38.63' KOP = 5200' Max Angle = 33 @ 9073' Datum MD = 9303' Datum TV D = 8800' SS • 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" 11 2491' TOP OF 4-1/2" TBG 2491' 13-3/8" CSG, 72#, L-80, ID = 12.347" 2684' Minimum ID = 3.725" @ 8506` 4-1/2" OTIS XN NIPPLE C 2757• I 5-1/2" SSSV, OTIS HRQ LANDING NIP, ID = 4.562" 2491' 5" X 4-1/2" xo GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3090 3022 0 OTIS-LBD RA 4 5086 5018 5 OTIS-LBD RA 3 7003 6759 26 OTIS-LBD RA 2 7975 7637 24 OTIS-LBD RA 1 8279 7915 23 OTIS-LBD RA 1/2" BAKER L SLIDING SLEEVE ID = 1 6' 4 " 83 - , 3.8 3 5 8416' TMJ SBR SEAL ASSY " ' " ' 9-5/8 X 4-1/2 TMJ HBBP PKR, ID = 3.958 8431 1/2" OTIS X NIP ID = 3 813" 8473' 4 TOP OF 7" LNR 8460' - , . 1/2" OTIS XN NIP ID = 3 725" 8506' 4 4 1/2" TBG 12 6# L 80 0152 b f ID = " ' - , . 1/2" TTL W/TIW SOS ID = 3 958" 8536' 4 - , . , - , . p , 3.958 8536 9-5/8" CSG, 47#, L-80, ID = 8.681" 8762' - , . 8540' ELMD TT LOGGED 04!17/88 9150' ~MARKERJDINT PERFORATION SUMMARY REF LOG: ATLAS BHCA ON 03/06/88 ANGLE AT TOP PERF: 32 @ 9316' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 9316 - 9324 O 04/30/95 3-3/8" 6 9383 - 9391 O 04/30/95 3-3/8" 6 9469 - 9487 O 04/17/88 3-3/8" 6 9493 - 9509 O 04/17/88 PBTD 9620' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9663' DATE REV BY COMMENTS DATE REV BY COMMENTS 03/10/88 ORIGINAL COMPLETION 05/22/01 RN/TP CORRECTIONS 07/03/03 CMO/TLP MAX ANGLE CORRECTION 09/15/03 CMO/TLP DATUM MD & PERF ANGLE PRUDHOE BAY UNIT WELL: G34 PERMIT No: 1880150 API No: 50-029-21785-00 SEC 19, T11 N, R14E, 1565' SNL & 882' WEL BP Exploration (Alaska} .TREE = 6" CNV WELLHEAD= McEVOY ACTUATOR = OTIS KB. ELEV = 67.51' BF. ELEV = 38.63' KOP = 5200' Max Angle = 33 @ 9073' Datum MD = 9303' Datum ND = 8800' SS ~ C-34A Proposed CTD Sidetrack O 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" ~ 2491' TOP OF 4-1 /2" TBG 2491' 13-3/8" CSG, 72#, L-80, ID = 12.347" 2684' Minimum ID = 3.725" @ 8506' 4-1 /2" OTIS XN NIPPLE SAFETY NOTES: 5-1/2" SSSV, OTIS HRO LANDING NIP, ID = 4.562" 5" X 4-1/2" XO CAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 5 3090 3022 0 OTIS-LBD RA 4 5086 5018 5 OTIS-LBO RA 3 7003 6759 26 OTIS-LBD RA 2 7975 7637 24 OTIS-LBD RA 1 8279 7915 23 OTIS-LBD RA $356' 4-1/2" BAKER L SLIDING SLEEVE, ID = 3.813" 8416' TNV SBR SEAL ASSY TOP OF 7" LNR ~-~ $460' 4- 12.6#, L-80, .0152 bpf, ID = 3.958" 9-5l8" CSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY REF LOG: ATLAS BHCA ON 03/06/88 ANGLE AT TOP PERF: 32 @ 9316' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 9316 - 9324 isolated proposed 3-3/8" 6 9383 - 9391 isolated proposed 3-3/8" 6 9469 - 9487 isolated proposed 3-3/8" 6 9493 - 9509 isolated proposed PBTD 9620' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9663' -j 8431' ~- 1 9-5/8' X 4-1/2" TNV HBBP PKR, ID = 3.958" $473' 4-1 /2" OTIS X NIP, 10 = 3.813" 8485' TOP OF 3-3/16" LNR 8495' 3.5" XN Nip 2.75" ID $506' 4-1/2" OTIS XN NIP, ID = 3.725" $536' 4-1/2" TTL W/TIW SOS, ID = 3.958" $rj40' ELMD TT LOGGED 04/17/88 - 9100' Top of Cement 9150' MARKER JOINT 10000' 3-3/16 x 2-7/8 X-over ~-3/16" X 2-7/8" cmt'ed and perfedl-~ 11000' ~ ~ 9345' Mechanical Whipstock DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfr 03/10/88 ORIGINAL COMPLETION WELL: G34 05/22(01 RN/TP CORRECTIONS PERMfr No: 1880150 07/03/03 CMO/TLP MAX ANGLE CORRECTION API No: 50-029-21785-00 09/15/03 CMO/TLP DATUM MD & PERF ANGLE SEC 19, T11 N, R14E, 1565' SNL & 882' WEL BP Exploration (Alaska) • by BP Alaska Baker Hughes INTEQ Planning Report ~~~ sees INTEQ Company: BP Amoco Date: 2/17/2008 Time: 20;01:18 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Referenced. Weg; G34. True North Site: PB C Pad Vertkal (TVD) Reference: 41 ; 34 2/22/1988 00:00 87.5 Well: G34 Seetbn (VS) Reference: Weil (O.OOtJA.00E,195.00Azi) Wellpath: Plan 2, C-34A Survey Cah:a~tton Method: Minimum Guroature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Msp System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagrretk Modei: bggm2005 Site: PB C Pad TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5957218.72 ft Latitude: 70 17 22.367 N From: Map Eastlng: 662550.03 ft Longitude: 148 41 2.797 W Position Uncertainty: 0.00 ft North Reference: True Grouud Level: 0.00 ft Grid Convergence: 1.24 deg Well: C-34 Sbt Name: 34 C-34 Well Position: +N/-S 2395.63 ft Northing: 5959657.00 ft Latitude: 70 17 45.926 N +E/-W 2006.37 ft Fasting : 664504.00 ft Lougitude: 148 40 4.317 W Position Uncertainty: 0.00 ft Wellpsth: Plan 2, C-34A Drilled From: C-34 Tie-on Depth: 9317.60 ft Current Datum: 41:34 2/22/1988 00:00 Hefght 67.50 ft Above System Datum: Mean Sea Level Magnetic Data: 2/17/2006 Declination: 24.62 deg Field Strength: 57605 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.50 0.00 0.00 195.00 Plan: Plan #2 Date Composed: 2/17/2006 Copy Camara PIan2 Version: 2 Principal: Yes Tied-to: From: Definitive Path Targets Name Description Dip.: Dlr. TVD ft +N/-S ft +E/-W ft Map Map Northing Eastiag ft ft <-- Latkade ---> Deg Mio Sec . <- Longitude -> .Deg Mie Sec C-34A Polygon 67.50 800.26 1964.12 5960500.00 666450.00 70 17 53.794 N 148 39 7.062 W -Polygon 1 67.50 800.26 1964.12 5960500.00 666450.00 70 17 53.794 N 148 39 7.062 W -Polygon 2 67.50 509.32 2002.77 5960210.00 666495.00 70 17 50.932 N 148 39 5.937 W -Polygon 3 67.50 -462.67 1166.24 5959220.00 665680.00 70 17 41.374 N 148 39 30.326 W -Polygon 4 67.50 -215.70 851.54 5959460.00 665360.00 70 17 43.804 N 148 39 39.497 W -Polygon 5 67.50 707.39 1636.99 5960400.00 666125.00 70 17 52.881 N 148 39 16.598 W C-34A Fault1 67.50 931.66 1901.98 5960630.00 666385.00 70 17 55.086 N 148 39 8.872 W -Polygon 1 67.50 931.66 1901.98 5960630.00 666385.00 70 17 55.086 N 148 39 8.872 W -Polygon 2 67.50 969.39 1777.77 5960665.00 666260.00 70 17 55.457 N 148 39 12.493 W -Polygon 3 67.50 1102.47 1410.57 5960790.00 665890.00 70 17 56.767 N 148 39 23.1 ~ W -Polygon 4 67.50 969.39 1777.77 5960665.00 666260.00 70 17 55.457 N 148 39 12.493 W C-34A Fauk2 67.50 88.51 663.14 5959760.00 665165.00 70 17 46.796 N 148 39 44.988 W -Polygon 1 67.50 88.51 663.14 5959760.00 665165.00 70 17 46.796 N 148 39 44.988 W -Polygon 2 67.50 -64.85 814.83 5959610.00 665320.00 70 17 45.287 N 148 39 40.567 W C-34A Target2 9035.50 644.71 1758.66 5960340.00 666248.00 70 17 52.264 N 148 39 13.052 W C-34A Target3 9035.50 -325.82 992.18 5959353.00 665503.00 70 17 42.721 N 148 39 35.399 W C-34A Targetl 9040.50 731.05 1835.57 5960428.00 666323.00 70 17 53.113 N 148 39 10.810 W Annotation MD ft TVD ft 9317.60 8880.01 TIP 9345.00 8903.31 KOP 9365.00 8920.17 End of 9 Deg/100' DLS 9405.00 8951.74 4 9621.95 9039.97 5 9756.95 9035.12 End of 38 Deg1100' DLS • by BP Alaska Baker Hughes INTEQ Planning Report BAR ^ INTEQ Company: $P Amoco Date: 2/17/2008 Time 20101:16 Page:: . 2 P1eld: Prudtroe Bey " Caordteate(NE) Refereece: Well: C-34, True North Site: PB C Pad Vertical (TVD) Refereecee 4 1:34 2/22/198800:00 67.5 WeU: C-34 Secdon (VS) Refereece: Well (O.OON,O.OOE,195OOAzi) WeUpath: Plan 2, C-34A Survey Cakalado® M~6ode Minimum Curvature Dba C lrade Annotation MD TVD ft ft 9981.95 9035.06 7 10281.95 9035.11 8 10591.95 9035.15 9 11000.00 9035.20 TD Plan Section Informadoe MD Ind Azim TVD +N! S +E/-W DLS Band Tern TFO Target ft .deg deg ft ft ft deg/100ft deg/100ft degl100ft deg 9317.60 31.72 65.79 8880.01 841.03 1635.54 0.00 0.00 0.00 0.00 9345.00 31.77 65.66 8903.31 846.96 1648.68 0.31 0.18 -0.47 306.11 9365.00 33.34 67.30 8920.17 851.25 1658.55 9.00 7.85 8.19 30.00 .9405.00 42.76 86.83 8951.74 856.27 1682.39 38.00 23.56 48.84 60.00 9621.95 93.80 161.41 9039.96 736.29 1813.96 38.00 23.52 34.37 76.00 9756.95 90.04 212.61 9035.12 606.83 1797.97 38.00 -2.79 37.93 93.00 9981.95 89.99 239.61 9035.06 452.29 1637.30 12.00 -0.02 12.00 90.10 10281.95 89.99 203.61 9035.11 231.67 1441.34 12.00 0.00 -12.00 270.00 10591.95 89.99 240.81 9035.15 6.08 1236.69 12.00 0.00 12.00 90.00 11000.00 90.00 191.85 9035.20 -312.74 1002.24 12.00 0.00 -12.00 270.00 Survey MD Inca Azim Sys TVD N/S FJW MapN MapE DLS VS ` TFO Toal ft deg deg ft ft ft ft ft deg/100ft ft deg 9317.60 31.72 65.79 8812.51 841.03 1635.54 5960533.57 666120.63 0.00 -1235.68 0.00 MWD 9345.00 31.77 65.66 8835.81 846.96 1648.68 5960539.78 666133.63 0.31 -1244.81 306.11 MWD 9350.00 32.16 66.08 8840.05 848.04 1651.10 5960540.91 666136.03 9.00 -1246.48 30.00 MWD 9365.00 33.34 67.30 8852.67 851.25 1658.55 5960544.28 666143.41 9.00 -1251.51 29.64 MWD 9370.00 34.32 70.22 8856.82 852.25 1661.14 5960545.35 666145.98 38.00 -1253.15 60.00 MWD 9380.00 36.49 75.61 8864.97 853.95 1666.68 5960547.16 666151.47 38.00 -1256.22 57.58 MWD 9390.00 38.87 80.46 8872.89 855.21 1672.65 5960548.55 666157.42 38.00 -1258.98 53.17 MWD 9400.00 41.43 84.82 8880.53 856.03 1679.05 5960549.51 666163.79 38.00 -1261.43 49.33 MWD 9405.00 42.76 86.83 8884.24 856.27 1682.39 5960549.83 666167.13 38.00 -1262.53 46.00 MWD 9410.00 43.26 89.53 8887.90 856.38 1685.80 5960550.01 666170.53 38.00 -1263.51 76.00 MWD 9420.00 44.42 94.75 8895.11 856.12 1692.71 5960549.90 666177.45 38.00 -1265.05 74.03 MWD 9430.00 45.82 99.74 8902.17 855.22 1699.74 5960549.16 666184.49 38.00 -1266.00 70.26 MWD 9440.00 47.42 104.48 8909.04 853.69 1706.84 5960547.78 666191.63 38.00 -1266.36 66.74 MWD 9450.00 49.20 108.98 8915.70 851.54 1713.98 5960545.79 666198.82 38.00 -1266.14 63.48 MWD 9460.00 51.15 113.22 8922.10 848.77 1721.15 5960543.18 666206.04 38.00 -1265.32 60.49 MWD 9470.00 53.25 117.23 8928.23 845.40 1728.29 5960539.97 666213.25 38.00 -1263.91 57.77 MWD 9480.00 55.47 121.03 8934.06 841.44 1735.38 5960536.17 666220.43 38.00 -1261.92 55.31 MWD 9490.00 57.81 124.62 8939.56 836.91 1742.40 5960531.79 666227.54 38.00 -1259.36 53.10 MWD 9500.00 60.24 128.02 8944.71 831.84 1749.30 5960526.86 666234.55 38.00 -1256.24 51.12 MWD 9510.00 62.75 131.27 8949.48 826.23 1756.06 5960521.41 666241.44 38.00 -1252.58 49.37 MWD 9520.00 65.34 134.37 8953.86 820.12 1762.66 5960515.44 666248.16 38.00 -1248.38 47.82 MWD 9530.00 67.98 137.34 8957.82 813.53 1769.05 5960509.00 666254.70 38.00 -1243.67 46.46 MWD 9540.00 70.68 140.20 8961.35 806.49 1775.21 5960502.10 666261.01 38.00 -1238.47 45.29 MWD 9550.00 73.42 142.96 8964.43 799.04 1781.12 5960494.77 666267.08 38.00 -1232.80 44.28 MWD 9560.00 76.20 145.65 8967.05 791.20 1786.75 5960487.06 666272.88 38.00 -1226.69 43.42 MWD 9564.15 77.36 146.75 8968.00 787.85 1788.99 5960483.76 666275.20 38.00 -1224.03 42.72 C-34A T 9570.00 79.00 148.28 8969.20 783.01 1792.07 5960478.99 666278.38 38.00 -1220.16 42.47 MWD 9580.00 81.83 150.85 8970.86 774.51 1797.06 5960470.61 666283.56 38.00 -1213.24 42.16 MWD 9590.00 84.67 153.39 8972.04 765.74 1801.71 5960461.93 666288.39 38.00 -1205.96 41.73 MWD 9600.00 87.53 155.91 8972.72 756.72 1805.98 5960453.02 666292.86 38.00 -1198.36 41.43 MWD 9610.00 90.39 158.41 8972.90 747.51 1809.86 5960443.89 666296.94 38.00 -1190.46 41.26 MWD 9620.00 93.24 160.92 8972.58 738.14 1813.33 5960434.60 666300.61 38.00 -1182.31 41.21 MWD 9621.95 93.80 161.41 8972.46 736.29 1813.96 5960432.77 666301.28 38.00 -1180.69 41.29 MWD 9630.00 93.63 164.47 8971.94 728.62 1816.31 5960425.15 666303.81 38.00 -1173.89 93.00 MWD 9640.00 93.41 168.27 8971.33 718.92 1818.67 5960415.50 666306.37 38.00 -1165.13 93.20 MWD 9650.00 93.18 172.07 8970.75 709.08 1820.37 5960405.71 666308.29 38.00 -1156.07 93.43 MWD 9660.00 92.93 175.87 8970.22 699.16 1821.42 5960395.80 666309.55 38.00 -1146.75 93.65 MWD 9670.00 92.67 179.66 8969.73 689.18 1821.81 5960385.84 666310.16 38.00 -1137.21 93.85 MWD by BP Alaska Baker Hughes INTEQ Planning Report Bi~~ s INTEQ Company: BP Amoco Date: 2M7/2006 Time: 20:01:16 1Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: C-34, True North Site: PB C Pad Vertkal ('f VD) Reference: 4 1:34 2!22/1988 00:00 67.5 Well: G34 Section (VS) Referenced WeN (O.OON,O.OOE,195.OOAai) Wellpatb: Plan 2, G34A Survey Cakalation Metbod: Minimum Curvature Db: O rede Survey MD Inc! Aim Sys TVD N/5 E/W MapN MapE D[S VS TFt) Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 9680.00 92.40 183.46 8969.29 679.19 1821.54 5960375.85 666310.11 38.00 -1127.50 94.04 MWD 9690.00 92.11 187.25 8968.90 669.25 1820.60 5960365.89 666309.39 38.00 -1117.65 94.21 MWD 9700.00 91.82 191.04 8968.55 659.38 1819.02 5960355.99 666308.02 38.00 -1107.71 94.36 MWD 9710.00 91.52 194.83 8968.26 649.64 1816.78 5960346.20 666306.00 38.00 -1097.72 94.49 MWD 9720.00 91.21 198.62 8968.02 640.07 1813.90 5960336.57 666303.33 38.00 -1087.73 94.60 MWD 9730.00 90.90 202.41 8967.84 630.71 1810.40 5960327.13 666300.04 38.00 -1077.78 94.69 MWD 9740.00 90.58 206.19 8967.71 621.59 1806.29 5960317.94 666296.12 38.00 -1067.91 94.76 MWD 9750.00 90.26 209.98 8967.64 612.77 1801.58 5960309.01 666291.61 38.00 -1058.18 94.81 MWD 9756.95 90.04 212.61 8967.62 606.83 1797.97 5960303.00 666288.13 38.00 -1051.50 94.83 MWD 9775.00 90.04 214.78 8967.61 591.82 1787.96 5960287.77 666278.45 12.00 -1034.41 90.10 MWD 9800.00 90.03 217.78 8967.59 571.67 1773.16 5960267.30 666264.10 12.00 -1011.12 90.10 MWD 9825.00 90.02 220.78 8967.58 552.32 1757.34 5960247.61 666248.71 12.00 -988.33 90.10 MWD 9850.00 90.02 223.78 8967.57 533.82 1740.52 5960228.75 666232.30 12.00 -966.11 90.10 MWD 9875.00 90.01 226.78 8967.56 516.23 1722.76 5960210.78 666214.93 12.00 -944.53 90.11 MWO 9900.00 90.01 229.78 8967.56 499.60 1704.10 5960193.74 666196.64 12.00 -923.63 90.11 MWD 9925.00 90.00 232.78 8967.56 483.96 1684.60 5960177.68 666177.49 12.00 -903.48 90.11 MWD 9950.00 90.00 235.78 8967.56 469.37 1664.31 5960162.65 666157.52 12.00 -884.13 90.11 MWD j 9975.00 89.99 238.78 8967.56 455.85 1643.28 5960148.68 666136.79 12.00 -865.63 90.11 MWD 9981.95 89.99 239.61 8967.56 452.29 1637.30 5960144.99 666130.90 12.00 -860.65 90.11 MWD 10000.00 89.99 237.45 8967.56 442.87 1621.91 5960135.23 666115.72 12.00 -847.56 270.00 MWD 10025.00 89.99 234.45 8967.57 428.87 1601.20 5960120.79 666095.32 12.00 -828.68 270.00 MWD 10050.00 89.99 231.45 8967.57 413.81 1581.25 5960105.29 666075.71 12.00 -808.97 270.00 MWD 10075.00 89.99 228.45 8967.58 397.73 1562.12 5960088.79 666056.93 12.00 -788.48 270.00 MWD 10100.00 89.99 225.45 8967.58 380.66 1543.85 5960071.33 666039.04 12.00 -767.27 ~ 270.00 MWD 10125.00 89.99 222.45 8967.59 362.66 1526.50 5960052.96 666022.09 12.00 -745.40 270.00 MWD 10150.00 89.99 219.45 8967.59 343.78 1510.12 5960033.73 666006.13 12.00 -722.92 270.00 MWD 10175.00 89.99 216.45 8967.59 324.07 1494.75 5960013.69 665991.20 12.00 -699.90 270.00 MWD 10200.00 89.99 213.45 8967.60 303.58 1480.43 5959992.89 665977.33 12.00 -676.40 270.00 MWD 10225.00 89.99 210.45 8967.60 282.37 1467.20 5959971.40 665964.57 12.00 -652.49 270.00 MWD 10250.00 89.99 207.45 8967.61 260.50 1455.11 5959949.26 665952.95 12.00 X28.23 270.01 MWD 10275.00 89.99 204.45 8967.61 238.02 1444.17 5959926.55 665942.51 12.00 -603.69 270.01 MWD 10281.95 89.99 203.61 8967.61 231.67 1441.34 5959920.14 665939.82 12.00 -596.82 270.01 MWD 10300.00 89.99 205.78 8987.61 215.27 1433.80 5959903.59 665932.64 12.00 -579.03 90.00 MWD 10325.00 89.99 208.78 8967.62 193.06 1422.34 5959881.13 665921.68 12.00 -554.61 90.00 MWD 10350.00 89.99 211.78 8967.62 171.47 1409.74 5959859.27 665909.55 12.00 -530.49 90.00 MWD 10375.00 89.99 214.78 8967.63 150.57 1396.02 5959838.08 665896.29 12.00 -506.76 90.00 MWD 10400.00 89.99 217.78 8967.63 130.42 1381.23 5959817.61 665881.95 12.00 -483.46 90.00 MWD 10425.00 89.99 220.78 8967.63 111.07 1365.40 5959797.92 665866.55 12.00 -460.68 90.00 MWD 10450.00 89.99 223.78 8967.64 92.57 1348.59 5959779.06 665850.14 12.00 -438.46 90.00 MWD 10475.00 89.99 226.78 8967.64 74.99 1330.83 5959761.09 665832.77 12.00 X16.87 90.00 MWD 10500.00 89.99 229.78 8967.64 58.35 1312.17 5959744.05 665814.49 12.00 -395.98 90.00 MWD 10525.00 89.99 232.78 8967.65 42.71 1292.67 5959727.99 665795.33 12.00 -375.82 90.00 MWD 10550.00 89.99 235.78 8967.65 28.12 1272.37 5959712.96 665775.36 12.00 -356.47 90.00 MWD 10575.00 89.99 238.78 8967.65 14.61 1251.34 5959698.99 665754.64 12.00 -337.98 90.00 MWD 10591.95 89.99 240.81 8967.65 6.08 1236.69 5959690.14 665740.18 12.00 -325.95 90.00 MWD 10600.00 89.99 239.85 8967.66 2.09 1229.70 5959686.01 665733.27 12.00 -320.29 270.00 MWD 10625.00 89.99 236.85 8967.66 -11.02 1208.42 5959672.43 665712.29 12.00 -302.11 270.00 MWD 10650.00 89.99 233.85 8967.66 -25.24 1187.86 5959657.77 665692.04 12.00 -283.06 270.00 MWD 10675.00 89.99 230.85 8967.66 -40.51 1168.07 5959642.07 665672.59 12.00 -263.19 270.00 MWD 10700.00 89.99 227.85 8967.67 -56.79 1149.10 5959625.38 665653.99 12.00 -242.55 270.00 MWD 10725.00 89.99 224.85 8967.67 -74.05 1131.02 5959607.73 665636.29 12.00 -221.20 270.00 MWD 10750.00 89.99 221.85 8967.67 -92.23 1113.86 5959589.18 665619.53 12.00 -199.20 270.00 MWD 10775.00 89.99 218.85 8967.68 -111.28 1097.67 5959569.78 665603.77 12.00 -176.61 270.00 MWD 10800.00 89.99 215.85 8967.68 -131.15 1082.51 5959549.58 665589.05 12.00 -153.49 270.00 MWD 10825.00 89.99 212.85 8967.68 -151.79 1068.41 5959528.64 665575.40 12.00 -129.91 270.00 MWD 10850.00 89.99 209.85 8967.68 -173.14 1055.40 5959507.02 665562.86 12.00 -105.92 270.00 MWD 10875.00 89.99 206.85 8967.69 -195.14 1043.53 5959484.76 665551.48 12.00 -81.60 270.00 MWD BP Alaska • by Baker Hughes INTEQ Planning Report BAKER ^ i1R1Q!!s 1NTEQ Company: BP Amoco Date: 2/17/2008 Time: 20:01:16 Page: 4 Field: Prudhoe Bay Co-ordioate(NE) Refereece: Weil: C34, True North ` Site: PB C Pad Vertical (TVD) Refereece: 41:34 2/22/1988 00:00 B7.5 Weu: C-34 Sectloe (VS) Refereece: Weil (O.OON,O.OOE,195.OOAzi) Wellpath: Plan 2, C-34A Survey Cakalation Method: Minimum Curvature Db: Orade Survey MD lecl Azim Sy: TVD N/S EIW MapN MapE DI.S VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 10900.00 89.99 203.85 8967.69 -217.73 1032.83 5959461.95 665541.28 12.00 -57.01 270.00 MWD 10925.00 89.99 200.85 8967.69 -240.85 1023.33 5959438.63 665532.28 12.00 -32.22 270.00 MWD 10950.00 90.00 197.85 8967.69 -264.43 1015.05 5959414.87 665524.52 12.00 -7.29 270.00 MWD 10975.00 ,90.00 194.85 8967.70 -288.42 1008.01 5959390.73 665518.01 12.00 17.70 270.00 MWD 11000.00 90.00 191.85 8967.70 -312.74 1002.24 5959366.29 665512.77 12.00 42.69 270.00 3.50" • ~ a ~ ~ . ... _. .- :_~ A ... ._. ...., .. N `r.. ,. ,.; . ~ , .. , . .. l _i.. . ,~ _ _ ~ ! =~ a a ! _ / ! t + ' 't 1" , . ~~1 # - - .. ... .. l ......_..._. .. -~--~--r- ~.. :i ..~.. ..... {.' ~ I .. .. `.. n . ._~_._. t"-" . ~._ _$ i 7 , J -E x + t + i ! ~ ~ --- ---~- 1 ~" 1 ! + I F 1 e '-~~'-'-~--t _, ~f! Q ~' ::::_j. ~__ j..._:: _ -° _;.._. --: F :-:::_~_..:: ...1.. ----r....:..+--- i t _ '7""'y"--+~"' . .: ,j.. ..f....~. .:"7.~ :- { ..~ ----a--= (' 141•oN/1-)410$ F ~[~~~ i i::iii~ SS C x:ii;i~e: # 'iai36 ~ a~~aQe s ::.. ~. ~ 8cg88$e84$ p $x#..#$s~ Ai:'9a 5 t E5i3ge e ee "~ g eae Y $ ~~ ~ g ~a~6 ~8 87El8886 y y i iii ~ ~ u g ; 9 a x ~ ~ ~ g ~ ~ • $3~i.~ei$s f ~SS$~~~5 Q ii" i~ J. ~ ~ ~ "eixCiiiaE~ i K Qe5jp a, o ~ 8 Xij ~~ ~ i:i$x$f : ~ m ~ 88 §~, & ~£~~ eg ff ::i,:= .... ..~ • 111111!3!1 ~ $ ~ ~ ~i ~ aa885fi~ i Ld [ F 3 ix ~:'•~ x Li aRS. r ~ ~ x o ~ 5H W e ~i d C ...8 fii~ ..sitii saes::::: 8 e S ... ~..° Y Q 88881::::8 a s:R ic ~ , y ^:113c$$$F Y [$$ s = ":axcea it •.......« ~ 2~a i$$$$$ .. ,:: ' _ ~ ~ ~ y -- --~, ... ._t_ _ _ _ „ 3 _ re ,.. -,,~ _~ - - _ .::.: -.; _. __ _-g c 9 g - i i- ,__ - -:: --~---~i ~ -- ~ j:~ l ~-.: ;: :~ --- = .. ~----{----tt-~- ~ F --1 --- -- ~ --- ~-- --`- ---- - --- ---E '~ ~ 9 E .. ..... ..~.~ 1.. .!{ ..... t. .. l _ ~ I ~ ~ ! , 1 ~ + ~ E _ ~ _ ~ i i i i i i i i i i i i i i i [uln/o51 4ldap I ~q A elul 8 urements are • • i N (n ~ C-34A bag S BAG 7 1/16" 5000 psi. bag of slips of pipes cross middle of bl Blind/Shears TOTs ~ 2 3/8" combi ram/slips 7 1/16" 5000psi Mud Cross I I Mud Cross 7 1 /16" 5000psi variable bore pipe 3 1/2"-2 3/8" TOTs ~ 2 3/8" combi ram/slips ~ 1/16" 5ooopsi Flow Tee ~ • TERRIE L..~UBBLE ss-snzs2 260 BP EXPLORATION AK INC "Mastercard Check" PO BOX 196612 MB 7-5 JV~~~ ANCHORAGE, AK 99519-66.12 DATE V PAY TO THE / ~~ $ / ~~: ORDER OF ((! DOLLARS First NationalBank Alaska Anchorage, AK 99501. MEMO ~ ~: L 2 5 2 0 0 0 6 0 ~: 9 9 L 4 ~~~ 6 2 2 7 ~~~ i 5 5 6 ~~• 0 2 6 0. a • • TRANSMITTAL LETTER CHECKLIST WELL NAME /d~j~ ~ ~'. PTD# ZG~.., - O Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. API No. 50- - - API number are , between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of weld until after ,(Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. Company NameZmust contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1 /25/06 C:\j ody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 __ _ --Well Name: PRUDHOE BAY UNI C-34A ________ _Program DEV __________ Well bore seg ;_ -. PTD#:2060370 Company BP EXPLQRAT~N_(ALA$KA~INC __-__ .:Initial ClasslType __--DEV 11~GeoArea 890 _..___ Unit 11650 _ OnlOff Shore On_ __J_ Annular Disposal !`l Administration 1 Permit-fee attached- ----------------------------------.--- .. Yes.....-.-.- ------ - ------ 2 Lease number appropriate- - _ _ Yes - . - . - ,3 Unique well_name and number. - - . - - Yes 4 Well located in a-defnedpool.-_ -------------------- ------------- Yes- ---_ -- j5 Well located proper distance from-drilling unit_boundary- - - - - - - - - - - - - - - - - - - - - - - Yes _ _ _ _ - - . _ - - . - ~6 Well located proper distance f[om-ether wells- Yes _ . _ _ - - 7 Sufficient acreage available m drilling unit- - - Yes 18 If deviated,iswellboreplatincluded__-____________________ Yes.-.-..----..-_. 9 Ope[atof only affected party - Yes _ _ 110 Ope[ator has appropriate-bond in force - - - - Yes - !,11 Permitcan be kssued without copservation orcer- - - - _ - - Yes - - - - - - . - _ Appr Date !12 Permitcan be issued without administrativ_e_approyal - - - - - - - . - - . Yes I13 RPC 31912006 Can permit be approved before 15-day wait- - Yes - . _ - - - I 14 Well located within area and strata authorized by Injection Order # (put IQ# in-comments)_(Fpr NA- - I !i 15 All wells within 114 mile area of review identified (For service wel_I only) - - - - NA- - - - - .. - i16 .Pre produced injector; duration of pre production less than 3 months-(For service well_only) - NA ACMP_Finding of Consiskency.has been issuedfor-this project . . . . . .. . ... . . . NA- - - . - - . _ - ' X18 Conducto[&tring-provided - - - - - . NA_ - - - . - - _ Engineering '~19 Surface casing-protects aII known USDWs _ _ _ _ _ _ _ .. NA_ _ _ _ _ _ 20 _CMTvoI-adequate-to circulate.onconducto[&suresg .. - - - - . NA- - - I!21 CMT-vol adeguateto kie-in long string to surf csg . - - - . - . - - - - - .. . _ : - - NA- . _ - - 22 CMT will coyer all known productive horizons- Yes ..Adequate excess. 23 Casing designs adequate for C,_T, B & permafrost. Yes - 24 Adequate tankage.or reserve pik .. - ... Yes CTDU. !25 If a re-drill, has-a 10x403 for abandonment been aRRroved . . . . . . . . . . .. . .. . . . . . .Yes .... - 319!2006. _ _ I26 Adequatewellboreseparationproposed_ Yes ~'~27 If dve[ter required, does it meet-regulations- _ _ - - _ - - - NA_ - . _ Sidetrack. Appr Date ~28 Drilling fluid program schematic & equip list adequate.. - - - . - . - - - Yes - Max MW_8.6 ppg._ WGA 3/1012006 29 BOPEs,_d9 they meet regulation - - . _ _ - _ _ _ -_ . _ _ - _ _ _ - - _ .. _ - . _ _ Yes _ _ _ 130 t3OPE-press rating appropriate; test to-(put prig in comments)- Yes - - - Test to 3500. psi, MSP 2320 psi.. 31 Choke.manifold complies wlAPl RP-53 (May 84)- - Yes !!32 Work will occur without operation shutdown _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ Yes - _ _ _ ~!33 Is presence_of H2S gas-probable. .. No. - . 20 ppm-max. - _ 134 Mechanical condition of wells within AOR verified (For_service well only) NA_ Geology X35 Permit_can be issued wlo hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ No- - - .. . . ~36 Data-presented on_potential ove-rpressure zones- _ _ _ _ . - - . - - . _ - _ _ - .. _ - . - - - NA_ _ _ Appr Date I37 Seismicanalysis_ofshollow gas zones- -------------- - NA----- RPC 3!9/2006 ~38 Seabed condition survey_(ifoff-shore) - NA- - 39 Contact namelphone for weekly_progress reports[exploratoryon/y] . - - NA_ Geologic Engineering - ~~jjublic „ Commissioner: Date: Commissioner: Date Con>ini on`er Date ~" ~~r~~ • Well History File APPENDIX • Information of detailed nature that is not particularly germane io the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accurnulaled at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ '~ .. c-34a.tapx Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Apr 29 12:14:21 2008 Reel Header Service name .............LISTPE Date .....................08/04/29 Ori9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Tape Header Service name .............LISTPE Date . ...................08/04/29 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. scientific Technical services Library. scientific Technical services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: C-34A API NUMBER: 500292178501 OPERATOR: BP Exploration (Alaska) Inc LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 24-APR-08 JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 3 JOB NUMBER: W-0004374649 W-0004374649 W-0004374649 LOGGING ENGINEER: S. LATZ S. LATZ S. LATZ OPERATOR WITNESS: R. WHITLOW/J R. WHITLOW/J R. WHITLOW/J MWD RUN 4 MAD RUN 4 JOB NUMBER: w-0004374649 w-0004374649 LOGGING ENGINEER: S. LATZ S. LATZ OPERATOR WITNESS: R. WHITLOW/J R. WHITLOW/J SURFACE LOCATION SECTION: 19 TOWNSHIP: 11N RANGE: 14E FNL: 1565 FSL: FEL: 882 FWL: Page 1 ~~~-v3~- ~~~aS~3 c-34a.tapx ELEVATION (FT FROM MSL O) KELLY BUSHING: 67.50 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 4.125 7.000 9347.0 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS). 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK IN THE C-34 wELLBORE. THE TOP OF THE WHIPSTOCK WAS AT 9347'MD/8837'TVDSS. THE WHIPSTOCK .WAS POSITIONED AND THE WINDOW WAS MILLED PRIOR TO MWD RUN 1. 4. MWD RUNS 1-3 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG), UTILIZING SCINTILLATION DETECTORS. UPHOLE SGRD TIE-IN DATA WERE MERGED WITH MWD DATA FROM RUN 1. 5. MWD RUN 4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MAD PASS DATA WERE ACQUIRED OVER THE ENTIRE OPEN-HOLE SECTION WHILE POOH AFTER REACHING FINAL TD. THESE MAD DATA ARE PRESENTED SEPARATELY. 6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED HOLE GAMMA RAY LOG .RUN IN C-34 ON 11 MAY 2006. THESE DATA WERE PROVIDED BY D.DORTCH (SAIC/BP) ON 17 MARCH 2008, PER DOUG STONER (BP). LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. MAD DATA WERE CORRECTED (SHIFTED) TO THE MWD DATA. 7. MWD RUNS 1-4 REPRESENT WELL C-34A WITH API#: 50-029-21785-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11043'MD/8963'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT = SMOOTHED TOOL RUNNING SPEED WHEN NOT DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). Page 2 c-34a.tapx SESP = SMOOTHED PHljSE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type.. ............LO Previous File Name.......5T5LI6.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9325.5 11000.5 ROP 9366.5 11044.0 RPX 9848.0 11013.5 FET 9848.0 11013.5 RPM 9848.0 11013.5 RPD 9848.0 11013.5 RPS 9848.0 11013.5 BASELINE CURVE FO R SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 9325.5 9326.0 9327.5 9328.0 9329.0 9330.5 9340.0 9341.0 9346.5 9345.5 9352.0 9353.5 9396.0 9400.0 9403.5 9407.0 9409.5 9413.0 9411.5 9414.5 9417.5 9419.0 9428.5 9431.0 9439.0 9440.5 9450.5 9453.0 9452.5 9455.0 9454.0 9456.5 9466.5 9468.0 9493.5 9495.0 9512.0 9510.5 9515.5 9513.5 9526.0 9525.5 9543.5 9543.0 Page 3 9551.0 9559.5 9562.5 9577.5 9648.0 9690.5 9825.0 9831.0 9903.5 10045.0 10055.5 10092.5 10207.5 10287.0 10314.5 10333.5 10403.0 10431.5 10461.0 10471.5 10505.0 10528.0 10532.0 10544.0 10608.0 10628.5 10642.5 10644.0 10658.0 10665.0 10690.5 10693.0 10767.0 10835.5 10843.5 10869.5 10872.0 10919.5 11044.0 9550.5 9559.5 9563.5 9578.0 9647.0 9691.5 9828.0 9833.0 9905.5 10042.5 10052.0 10092.0 10207.0 10286.0 10313.5 10331.0 10402.0 10432.5 10461.5 10470.5 10504.0 10526.0 10531.5 10544.0 10610.0 10630.5 10643.5 10645.0 10659.5 10667.0 10690.0 10692.0 10766.0 10835.5 10844.0 10871.0 10873.5 10918.5 11042.5 c-34a.tapx MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 2 MWD 3 MWD 4 REMARKS: MERGED MAIN PASS. MERGE TOP MERGE BASE 9326.0 9444.0 9444.0 9640.0 9640.0 9880.0 9880.0 11042.5 Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth units. .. .. .. ..... Datum specification Block sub-type...0 Page 4 ~ r c-34a.tapx Name Service order units size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 9325.5 11044 10184.8 3438 9325.5 11044 RPD MWD OHMM 4.17 22.17 12.7384 2332 9848 11013.5 RPM MWD OHMM 3.56 22.88 11.3145 2332 9848 11013.5 RPS MWD OHMM 3.52 17.94 10.6943 2332 9848 11013.5 RPX MWD OHMM 3.42 15.22 9.25171 2332 9848 11013.5 FET MWD HOUR 0.18 7.81 1.08131 2332 9848 11013.5 GR MWD API 15.67 1273.83 44.1197 3351 9325.5 11000.5 ROP MWD FT/H 1.36 2029.07 131.774 3356 9366.5 11044 First Reading For Entire File..........9325.5 Last Reading For Entire File...........11044 File Trailer Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLI6.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MAD Depth shifted DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR RPX RPS and clipped curves; all MAD runs merged using earliest passes. .5000 START DEPTH 9327.5 9343.5 9343.5 STOP DEPTH 11005.0 11019.0 11019.0 Page 5 ~ r RPD FET RPM RAT MERGED DATA SOURCE PBU TOOL CODE MWD REMARKS: c-34a.tapx 9343.5 11019.0 9343.5 11019.0 9343.5 11019.0 9371.5 11043.5 MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE 4 1 9328.0 11042.5 MERGED MAD PASS. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MAD OHMM 4 1 68 4 2 RPM MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPX MAD OHMM 4 1 68 16 5 FET MAD HOUR 4 1 68 20 6 GR MAD API 4 1 68 24 7 RAT MAD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 9327.5 11043.5 10185.5 3433 9327.5 11043.5 RPD MAD OHMM 0.56 2000 31.6963 3352 9343.5 11019 RPM MAD OHMM 0.3 2000 19.6377 3352 9343.5 11019 RPS MAD OHMM 0.24 2000 15.6887 3352 9343.5 11019 RPX MAD OHMM 0.13 29.72 7.89392 3352 9343.5 11019 FET MAD HOUR 0.71 75.23 32.4411 3352 9343.5 11019 GR MAD API 15.74 166.01 42.1345 3356 9327.5 11005 RAT MAD FT/H 0 1296 586.929 3345 9371.5 11043.5 First Reading For Entire File..........9327.5 Last Reading For Entire File...........11043.5 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Page 6 • Physical EoF File Header Service name... .......STSLIB.003 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD c-34a.tapx Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9326.0 9414.0 OP 9369.0 9444.0 $ LOG HEADER DATA DATE LOGGED: 07-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9444.0 TOP LOG INTERVAL (FT): 9328.0 BOTTOM LOG INTERVAL (FT): 9444.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 31.8 MAXIMUM ANGLE: 44.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG033 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 9347.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: Fl o Pro 8.60 65.0 9.1 31000 8.4 .000 .0 .000 141.7 .000 .0 .000 .0 Page 7 i NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): i c-34a.tapx REMARKS: Data Format specification Record. Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name Service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWDO10 API 4 1 68 4 2 ROP MWDO10 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9326 9444 9385 237 9326 9444 GR MWDO10 API 15.67 1273.83 62.9527 177 9326 9414 ROP MWDO10 FT/H 1.5 120.81 38.0696 151 9369 9444 First Reading For Entire File..........9326 Last Reading For Entire File...........9444 File Trailer Service name... .......STSLIB.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.004 Physical EOF File Header service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.003 Page 8 • c-34a.tapx Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9414.5 9611.0 ROP 9444.5 9640.0 LOG HEADER DATA DATE LOGGED: 07-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Incite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9640.0 TOP LOG INTERVAL (FT): 9444.0 BOTTOM LOG INTERVAL (FT): 9640.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 52.1 MAXIMUM ANGLE: 83.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG002 S BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 9347.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (5): 65.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 31000 FLUID LOSS (C3): 8.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 146.0 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Da ta Format specification Record Data Record Type ..................0 Page 9 c-34a.tapx Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value...... .................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MWD020 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9414.5 9640 9527.25 452 9414.5 9640 GR MWD020 API 16.79 103.33 39.145 394 9414.5 9611 ROP MWD020 FT/H 4.46 2029.07 128.676 392 9444.5 9640 First Reading For Entire File..........9414.5 Last Reading For Entire File...........9640 File Trailer Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File TyPe ................L0 Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLI6.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9611.5 9850.0 ROP 9640.5 9880.0 Page 10 • c-34a.tapx LOG HEADER DATA DATE LOGGED: 08-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9880.0 TOP LOG INTERVAL (FT): 9640.0 BOTTOM LOG INTERVAL (FT): 9880.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 90.9 MAXIMUM ANGLE: 95.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG002 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 9347.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: $.$ MUD CHLORIDES (PPM): 31000 FLUID LOSS (C3): 8.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 146.0 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Loggin Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units .. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 GR MWD030 API 4 1 68 4 2 Page 11 • c-34a.tapx ROP MWD030 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9611.5 9880 9745.75 538 9611.5 9880 GR MWD030 API 35.95 169.1 92.0184 478 9611.5 9850 ROP MWD030 FT/H 1.67 305.58 98.8819 480 9640.5 9880 First Reading For Entire File..........9611.5 Last Reading For Entire File...........9880 File Trailer Service name... .......STSLIB.005 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File TyPe ................L0 Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLI6.006 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 9850.0 11012.0 RPD 9850.0 11012.0 RPx 9850.0 11012.0 RPM 9850.0 11012.0 FET 9850.0 11012.0 GR 9850.5 10999.0 RoP 9880.5 11042.5 LOG HEADER DATA DATE LOGGED: 10-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11043.0 Page 12 • c-34a.tapx TOP LOG INTERVAL (FT): 9880.0 BOTTOM LOG INTERVAL (FT): 11043.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 87.4 MAXIMUM ANGLE: 92.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMB ER GM Dual GR 82758 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 9347.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: $.$ MUD CHLORIDES (PPM): 29000 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .140 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .000 .O MUD FILTRATE AT MT: .180 68.0 MUD CAKE AT MT: .130 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MwD040 OHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 GR MWD040 API 4 1 68 24 7 ROP MWD040 FT/H 4 1 68 28 8 Page 13 i • c-34a.tapx First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9850 11042.5 10446.3 2386 9850 11042.5 RPD MWD040 OHMM 4.17 22.17 12.7299 2325 9850 11012 RPM MWD040 OHMM 3.56 22.88 11.3003 2325 9850 11012 RPS MWD040 OHMM 3.52 17.94 10.6781 2325 9850 11012 RPX MWD040 OHMM 3.42 15.22 9.23329 2325 9850 11012 FET MWD040 HOUR 0.18 7.81 1.08454 2325 9850 11012 GR MWD040 API 18.64 108.84 33.6124 2298 9850.5 10999 ROP MWD040 FT/H 1.36 1595.39 145.346 2325 9880.5 11042.5 First Reading For Entire File..........9850 Last Reading For Entire File...........11042.5 File Trailer Service name... .......STSLIB.006 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.007 Physical EOF File Header Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5TSLI6.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD curves and log header data DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: 1 FILE SUMMARY for each pass of each run in separate files. VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9328.0 11003.5 RPD 9343.5 11017.5 RPM 9343.5 11017.5 FET 9343.5 11017.5 RPS 9343.5 11017.5 RPx 9343.5 11017.5 RAT 9374.0 11042.0 LOG HEADER DATA DATE LOGGED: SOFTWARE Page 14 10-MAY-06 • SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: c-34a.tapx Insite 4.3 Memory 11042.5 9328.0 11042.5 87.4 92.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR EWR4 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. .. ..... Datum specification Block sub-type...0 Name service order DEPT RPD MAD041 RPM MAD041 RPS MAD041 RPX MAD041 Units Size Nsam FT 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 OHMM 4 1 TOOL NUMBER 82758 178425 4.125 9347.0 Flo Pro 8.60 65.0 8.8 29000 5.6 .140 68.0 .000 .0 .180 68.0 .130 68.0 Rep code offset channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 Page 15 • i c-34a.tapx FET MAD041 HOUR 4 1 68 20 6 GR MAD041 API 4 1 68 24 7 RAT MAD041 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9328 11042 10185 3429 9328 11042 RPD MAD041 OHMM 0.56 2000 34.1822 3349 9343.5 11017.5 RPM MAD041 OHMM 0.3 2000 18.9369 3349 9343.5 11017.5 RPS MAD041 OHMM 0.24 2000 16.2852 3349 9343.5 11017.5 RPX MAD041 OHMM 0.13 29.72 7.89354 3349 9343.5 11017.5 FET MAD041 HOUR 0.71 75.23 32.4801 3349 9343.5 11017.5 GR MAD041 API 15.74 166.01 42.1567 3352 9328 11003.5 RAT MAD041 FT/H 0 1296 587.274 3337 9374 11042 First Reading For Entire File..........9328 Last Reading For Entire File...........11042 File Trailer Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.008 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/04/29 Origin ...................sTs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date . ...................08/04/29 Ori in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF scientific Technical services scientific Technical services Page 16 +, c-34a.tapx End Of LIS File Page 17