Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout206-051•, •
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original fife, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~ ~ - ®~~ Well History File Identifier
Organizing (done) ^ Two-sided III (IIIII II III II III ^ Rescan Needed III (IIIII II II III III
RESCAN DIGITAL DATA OVERSIZED (Scannable)
~olor Items: iskettes, No. ' ^ Maps:
^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by
a Large Scanner
^ Poor Quality Originals:
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: Maria Date: /s/
ProjectProofing III IIIIIIIIIII IIIII
BY: Maria Date: ~/~ D ~ /s/ ~ P
Scanning Preparation ~_ x 30 = + ~~ =TOTAL PAGES
(Count does not include cover sheet)
BY: Maria Date: /s/
Production Scanning III (IIIII IIIII II III
Stage 1 Page Count from Scanned File: ;~) ~ (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ,YES NO
BY: Maria Date: / ~ D 8 /s/ ~~
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. II I II II II (IIII IIIII
ReScanned III IIIIIIIIIII IIIII
BY: Maria Date: /s/
Comments about this file: Quality Checked III (IIIII III IIII III
10/6/2005 Well History File Cover Page.doc
• •
bp
BP Exploration (Alaska) Inc.
0
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
August 22, 2011
RECEIVED'
Mr. Tom Maunder AUG 31 2011
Alaska Oil and nd Gas Conservation Commission
333 Gam Cam. mss�o�
333 West 7 Avenue
Anchorage, Alaska 99501 Ars h, rage
Subject: Corrosion Inhibitor Treatments of GPB C -Pad - 05
Dear Mr. Maunder, 1 l0 B
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
C -Pad
7/19/11
Corrosion
Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft na gal
C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010
C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010
C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010
C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010
C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010
C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010
C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010
C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010
C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010
C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010
r>. C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010
C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010
C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010
C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010
C -16B 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011
C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010
C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010
C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010
C - 20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010
C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010
C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010
C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011
C -24A 2040580 500292081601 Sealed NA NA NA NA NA
C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010
C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010
C -27B 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010
C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010
C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011
C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010
C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010
C - 32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010
C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010
C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010
C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010
C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010
C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010
C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010
C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010
C-41A 2041880 500292238501 Sealed NA NA NA NA NA
C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010
c ~ ..~
ti~ ."~'~ '~ w _
.~~,:"
` '~- R
MICROFILMED
6/30/2010
DO NOT PLACE `
ANY NEW MATERIAL
UNDER THIS PAGE
C:\temp\Temporazy Internet Files\OLK9\Microfilm_Mazker.doc
WIELL L,®G '1cRAl~S1VIl<T'I'~-1L
To: State of Alaska July 2, 2008
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs: C-16B AK-MW-4391154
C-16B:
2" x 5" MD RESISTIVITY & GAMMA RAY Logs:
50-029-20438-02
2" x 5" TVD RESISTIVITY & GAMMA RAY Logs:
50-029-20438-02
Digital Log Images: ,~~~ ~UL ~ ~ 2~fl~
50-029-20438-02
1 Color Log
1 Color Log
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services BP Exploration (Alaska) Inc.
Attn: Rob Kalish Petrotechnical Data Center, MB33
6900 Arctic Blvd. 900 E. Benson Blvd.
Anchorage,; Alaska 99518° Anchorage, Alaska 99508
Date:. _ Signed:
a~iCo-E~( ~ ~CoCQ~
~~ J~
DATA SUBMITTAL COMPLIANCE REPORT
6/19/2008
Permit to Drill 2060510 Well Name/No. PRUDHOE BAY UNIT C-166
Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20438-02-00
MD 11465 TVD 9013 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
Tyke Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
~D D Asc Directional5urvey 9406 11465 Open 6/27/2006
Las
~~ 15517vCGamma Ray
~ 8714 11350 Open 10/3/2007 FCNL, GR, NCNL w/EMF
and PDS graphics
D C Lis 1595Jf~Neutron 8715 11326 Case 2/28/2007 LIS Veri, GR, CNT w/PDS
and Tif graphics
i
~g
Neutron
5 Blu 1 8724
11332
Open
2/28/2008
MCNL, GR, CCL, CNL 19-
May-2007
~RR'pt LIS Verification 9106 11462 Open 5/7/2008 LIS Veri, GR, ROP, RPX,
~ RPS, RPM, RPD, FET
~D C Lis 1622 nduction/Resistivity 9106 11462 Open 5/7/2008 LIS Veri, GR, ROP, RPX,
RPS, RPM, RPD, FET
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comme nts
ADDITIONAL INFORMATION
Well Cored? Y / A~ Daily History Received? N
Chips Received? ~I-AL-- Formation Tops ~/ N
Analysis .~L1,p1~
Received?
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
6/19/2008
Permit to Drill 2060510 Well Name/No. PRUDHOE BAY UNIT C-16B Operator BP EXPLORATION (ALASKA) INC
MD 11465 TVD 9013 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL
---
Compliance Reviewed By: _ Date: __~
API No. 50-029-20438-02-00
UIC N
~ ~
WELL LOG TRANSMITTAL
To: State of Alaska Apri123, 2008
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7~' Avenue, Suite 100
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs: C-16B AK-MW-4391154
1 LDWG formatted CD rom with verification listing.
API#: 5 0-029-2043 8-02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry Drilling Services BP Exploration (Alaska) Inc.
Attn: Rob Kalish Petrotechnical Data Center MB33
6900 Arctic Blvd. 900 E. Benson Blvd.
Anchorage, Alaska 99518 Anchorage, Alaska 99508
~~.
Date: s Signed: _ r-
~o~-os~ ~-/6~ao
ozlza/oa
J~''
G
d
~SCIII~t~~~l'I~~~'
Alaska Data 8 Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
wan ~„ti ~
~:?JL
i n....
15-25A 12014000 LDL / _~6 '~ 02/20/08
A-12A 11963077 MCNL sr 01119108
GNl-04 12031448 TEMP SURVEY (REVISED) '.~- ~ K (0 01/22108 1 1
P2-32 11968730 USIT - " 11 02/13/08 1 1
17-02 11996384 USIT / O - # '- 02/17/08 1 1
Y-07A 11962781 SCMT '}-1 ~ ' ~ 02103/08 1 1
P2-58 12031456 USIT /90 - ~~ 02/25/08 1 1
MPH-12 12005205 MEM INJ PROFILE ~ _ j~'}Q tt '~ 02115108 1 1
4-14/R-34 11975755 USIT V=e. ~ 02/25/08 1 1
S-126 11968731 JEWELRYIPERF/SBHP .. 9~. 1F ~ 02/15/08 1 1
o~ oneo nrve~~~wn r
. ______.._._.____---~-..-__.. ............... ....... ..~. v,.,.,..v v..~vvr~ c.nvn ~v.
l3P Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. ~~~ i_ , >> ~, ~~, ~_ ~~ ~~;
Anchorage, Alaska 99508
Date Delivered:
NO. 4612
Company: State of Alaska ~~
Alaska Oil & Gas Cons Comm Dq~a C «.
Attn: Christine Mahnken
333 West 7th Ave, Suite 100 , ~~ ~.- t
Anchorage, AK 99501 ~ ~ _ Q,"l
~ ~~'~13
Field: P,Bay,Aurora,GNI,Pt.Mac,Milne Pt,Endicott $0 ~~
BL Color CID .2 d~o ~ `) q~~
1 •
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-283
ATTN: Beth ~
Received by:
r:
~,~! : , , is 1 ' ~+ ~~
o2iz71os
~G~~Iib~~'t~"
N0.4599
Alaska Data 8 Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine Mahnken
ATTN: Betn 333 West 7th Ave, Suite 100
Anchorage, AK 98501
Field: P.Bay,Polaris,Lisburne
WPII _Inh 8 1 nn rto~ ~nr:.,n nos., o~ r,. ~..- nn
W-216 40016312 OH MWD/LWD EDIT S ~- 01/07/08 2 1
LGI-04 11970706 RST ~_~ ~- 12/31/07 1 1
W-45 40016146 OH MWD/LWD EDIT '}- '~ ~ 12/18107 2 1
15-046 12005202 CH EDIT PDC GR (SCMT) ~~ ~ 12/28/07 1
C-16B 11209604 MCNL ~pto. pS ~ / ( 05/19/06 1 1
B-18 11962779 RST 'd 01/05/08 1 1
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
~- ;~
,, ~. i, ~ -
Alaska Data & Consulting Services
2525 Gambell Street, Suite 4 ~
Anchorage, AK 99503-28 8 ~
ATTN: Beth ,,qq /
W
Received by:
s
c
Date 09-28-2007
Transmittal Number:92905
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below.
(BPXA FIELD LOG DATA)
F you have any questions, please contact Douglas Dortcn at one rD~, at oo~-~+y ~ ~
Delivery Contents
1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells:
02-35B ~OCo'd68 ~ lSS~~
07-07B ~Cp -O ZSl # t551 ~
C-16B c'bf;9-dam 1 QF t '~
l 5S
C-34A ~O(o-(~3~- # f5~~`lS
D-07Ba6S l $l ~ f ~~
E-21 B o?~ 5 /~~ *~ Jr~a' 1
G-06A 2b w -bl c~ ~ !'SJ~c~a
G-10C o~d(o-00°1 ~ 15~a3
Please Sign and Return one copy of this transmittal.
Thank You,
Douglas Dortch
Petrotechnical Data Center
Attn: State of Alaska - AOGCC
Attn: Christine Mahnken
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 995 19-66 1 2
14-Jun-06
AOGCC
Ceresa Tolley
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well C-16B
Dear Dear Sir/Madam:
Enclosed is one disk with the *.PTT and *.PDF files.
Tie-on Survey: 9,406.46' MD
Window /Kickoff Survey: 11,419.25' MD (if applicable)
Projected Survey: 11,465.00' MD
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date Signed
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
E~~~vED
1R
JUN 2 ~ 2006
~~ SStOt1
~p~-- b1 j
STATE OF ALASKA
ALAS IL AND GAS CONSERVATION COSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~~~~i~~
~uw ~ ~ zoos
Alaska ~~~ & Gas Cons. Corrlmis~o~
_ a~nrheraae
1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG
zoAACZS.,os zoAACZS.,,o
^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class:
®Development ^ Exploratory
^ Stratigraphic ^ Service
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
5/21/2006 12. Permit to Drill Number
206-051
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
5/14/2006 13. API Number
50-029-20438-02-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
5/18/2006 14. Well Name and Number:
PBU C-16B
116
FNL, 1218
FEL, SEC. 19, T11 N, R14E, UM
Top of Productive Horizon:
679' FNL, 904' FEL, SEC. 19, T11 N, R14E, UM g. KB Elevation (ft):
61.77' 15. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
Total Depth:
1074' FNL, 1307' FEL, SEC. 19, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD)
11420 + 9012 Ft
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 664130 y- 5961098 Zone- ASP4 10. Total Depth (MD+TVD)~PV
11465 + 013 Ft 16. Property Designation:
ADL 028305
TPI: x- 664458 y- 5960542 Zone- ASP4
Total Depth: x- 664066 Y- 5960138 Zone- ASP4 11. Depth where SSS set
None MD 17. Land Use Permit:
th
if
ff
h
19
W
t
d 20
f P
rmafrost
Thi
k
18. Directional Survey ®Yes ^ No ore
,
s
.
a
er
ep
o
N/A MSL .
c
ness o
e
1900' (Approx.)
21. Logs Run:
MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, MGR / CCL / CNL
ASING, LINER AND EMENTING ECORD
CASING ETTING PTH MD ETTING fPTH TVp HOLE OUNT
SIZE WT. PER FT. GRADE OP OTTOM OP OTTOM SIZE CEMENTING RECORD PULLED
20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 12.9 cu ds Concrete
13-3/8" 72# L-80 Surface 2691' Surface 2691' 17-1/2" 3720 cu ft Permafrost II
9-5/8" 47# L-80 Surface 8578' Surface 8278' 12-1/4" 1160 cu ft Class'G', 130 cu ft AS
7" 26# / 29# L-80 2672' 9040' 2672' 8740' 8-1 /2" 401 cu ft Class 'G'
4-1/2" 12.6# L-80 8894' 9425' 8594' 8990' 6" 225 cu ft Class'G'
s-vz° X s-3/16° x z-~is• a.a,a i s.za i s., sn L-80 9365' 11456' 8980' 9013' 4-1 /8" 168 cu ft Class 'G'
23. Perforations open.to Production (MD +TVD of Top and,
"
' 24. TUBING RECORD
Bottom Interval, Slze and Number; if none, state
none
): SIZE DEPTH SET (MD) PACKER SET (MD)
2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 8905' 8848'
MD TVD MD TVD
9600' - 9660' 9012' -9017'
9880' - 10020' 9022' -9016' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10470' - 10540' 9015' - 9020'
9024'
0
0
0' 9022'
' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
1
580
- 1
71
-
10880' -11420' 9011' - 9012' 2400' Freeze Protect w! 30 Bbls McOH
26• PRODUCTION TEST
Date First Production:
June 12, 2006 Method of Operation (Flowing, Gas Lift, etc.):
Flowing
Date of Test
6/13/2006 Hours Tested
4 PRODUCTION FOR
TEST PERIOD ,• OIL-BBL
513 GAS-MCF
805 WATER-BBL
22 CHOKE SIZE
53 GAS-OIL RATIO
1,571
Flow Tubing
Press. 38 Casing Pressure
1150 CALCULATED
24-HOUR RATE OIL-BBL
3,076 GAS-McF
4,831 WATER-BBL
134 OIL GRAVITY-API (CORK)
27.1
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None ,,,:~' ~ ~ t4 ~ ~ i € ~~ oT w//~o..c~ /d ~O r~it~' S7~O ~'A
I~,~ R~DNIS AFL JUN ~ 5 2006
Form 10-407 Revised 12/2003 '~ ~ ~ ~ REVERSE SIDE
~~
(°! L r
28. GEOLOGIC MARK 29' FORMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Zone 1 B 10875' 9012' None
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge. l
~~
T
~~1 V~o
Signed Terrie Hubble Title Technical Assistant Date
PBU C-16B 206-051 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: True vertical thickness.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
IreM 27: If no cores taken, indicate "None".
Frets 29: List all test information. If none, state "None".
FixTrr t0~7 Revised 12/2003 Submit Original Only
BP EXPLORATION
Operations Summary Report
Page 1 of 10
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Task (Code ; NPT Phase Description of Operations
I,_ 1
5/12/2006 ~ 17:30 - 18:00 ~ 0.50 RIGD ~ P ~ PRE ~ Rig released from C-34A C 22:OOHrs on 5/12/2006. Prep rig
18:00 - 19:00 1.00 MOB P PRE
19:00 - 21:00 2.00 MOB N WAIT PRE
21:00 - 22:00 1.00 MOB P PRE
22:00 - 00:00 2.00 BOPSU P PRE
5/13/2006 00:00 - 05:00 5.00 BOPSU P PRE
05:00 - 05:15 I 0.251 WHIP I P I I WEXIT
05:15 - 05:30 I 0.251 WHIP I P I I WEXIT
05:30-07:00 I 1.501WHIP IP I (WEXIT
07:00 - 07:30 I 0.501 WHIP I P I (WEXIT
07:30 - 07:45 I 0.251 WHIP I P I I W EXIT
07:45-10:40 I 2.921WHIP IP I (WEXIT
10:40 - 11:20 0.67 WHIP P WEXIT
11:20 - 11:30 0.17 WHIP P WEXIT
11:30-11:40 I 0.171WHIP IP I (WEXIT
11:40 - 12:00 0.33 WHIP P WEXIT
12:00 - 14:00 2.00 WHIP P WEXIT
14:00 - 14:15 0.25 WHIP P WEXIT
14:15 - 14:40 0.42 STWHIP P WEXIT
14:40 - 16:15 I 1.581 STWHIPI P I I WEXIT
for move to C-16B.
Move rig off C-34A, spot on upper side of pad
Wait on site prep
MIRU over C-166, Accept Rig at 22:00 hours on 05/12/06
NU BOP's
Grease tree valves & perform initial BOPE pressure & function
test, while filling rig pits with double slick 120 deg KCL fluid.
Spot, R/U hardline to tiger tank & PT to 4000psi, AOGCC test
witness waived by Chuck Schevie
Offload WS tools and equipment. PU to rig floor. SLB insert 2
RA pip tags into W FD LSXN 4-1/2" monobore whipstock. RA
PIP tag to TOWS = 8.9'.
Held pre-operations safety meeting. Reviewed well plan,
potential hazards & WS setting BHA M/U procedures.
M/U WS setting BHA #1 with WFD LSX-N 4-1/2" monobore
whipstock, setting adapter, hyd setting tool, BKR FAIV, Sperry
MWD/GR, orienter &WFD MHA. Scribe WS tray to MWD.
Circ out McOH from CT. Cut 5' of CT. Install WFD CTC & Pull
test to 35k - OK.
Pressure test inner reel valve &CTC to 3500psi - OK. Open up
well & observe Opsi WHP. IAP = 63psi. OAP = 39psi. M/U
injector & stab onto well.
RIH WS setting BHA #1 taking McOH FP returns to the tiger
tank. SHT MWD ~ 1500' &orienter C~ 3000' with
1.6bpm/1150psi - OK. Wt check ~ 9400' - Up = 39k, Run-in =
20k. RIH & lightly tag CIBP @ 9463'. P/U to up wt & correct
CTD to 9940' (CTMD). PUH to 9170' for MWD tie-in.
Log down from 9170' to 9213' @ 1.6bpm/1150psi & tie-into
04-Jun-03 Sperry-Sun MWD Log (which is -4' off depth from
Geology PDC log). Add 3.5' to CTD.
RBIH & position BOWS @ 9433.15' with TOWS @ 9420' &
4-1/2" Lnr collars ~ 9411' & 9452' (from 21-Apr-06 PDS
MGR/CCL).
Check TF - ~ 145R. Survey C~3 9397.91' gives 81.74degs
inclination. Orient TF 1 click to 156R. Orient TF 1 more click to
161 R. Orient TF 1 more click to 173R.
Circ C~ 3.05/3.05bpm & 4350psi for 5mins to arm the FAIV.
Drop pump to Obpm. Wait 5mins. Bring on pump to 1.6bpm,
pressure up & shear off W S @ 1600psi (- lower shear
pressure is due to different WFD setting adapter). Continue
pumping & observe TF of 178R. Set down 10k & WS held.
Paint EOP flag @ 9300'. POOH with WS setting BHA#1 circ
0.9bpm/200psi. Paint EOP flag C2 9300'. Meanwhile bleed
down the IAP from 1200psi to 300psi & OAP from 760psi to
55psi.
OOH. PJSM. S/B injector. L/D WS setting BHA #1.
M/U window milling BHA #2 with a 3.80" WFD DWM, 3.80" HC
DSR, WFD PDM, MHA & 2 jts of PH6 tbg (OAL - 83.79'). M/U
injector.
RIH window milling BHA #2. Wt check C~3 8800' = Up - 34k,
Run-in - 19k. Tag XN ~ 8911'. P/U to up wt & correct CTD
(-19') to "Schematic" depth of 8892'. Establish freespin
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: C-16
Common Well Name: C-16
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date ~ From - To I Hours Task Code
5/13/2006 14:40 - 16:15 1.58 STWHIP P
16:15 - 17:40 1.42 STWHIP P
17:40 - 18:00
18:00 - 00:00
5/14/2006 100:00 - 00:30
00:30 - 03:00
03:00 - 04:00
04:00 - 06:00
06:00 - 06:30
06:30 - 07:20
0.331 STWHIPI P
6.00 STWHIP P
0.50 STWHIP P
2.50 STWHIP P
1.00 STWHIP P
2.00 STWHIP P
0.50 STWHIP P
0.83 STWHIP P
07:20 - 08:45 1.42 STWHIP P
08:45 - 09:15 0.50 STWHIP P
09:15 - 09:30 0.25 DRILL P
09:30 - 10:15 0.75 DRILL P
10:15 - 10:30 0.25 DRILL P
10:30 - 11:00 0.50 DRILL P
Page 2 of 10
Spud Date: 5/11/1980
Start: 5/10/2006 End: 5/21 /2006
Rig Release: 5/21 /2006
Rig Number:
i
NPT j Phase Description of Operations
WEXIT 2.65bpm & 1300psi.
WEXIT Ease into milling from 8890' & mill thru XN nipple with 2.65bpm
& 1550psi. Make few passes with & without pumping to ensure
there are no restrictions/overpulls. Got back some gas to
surface (suspect from behind tail pipe).
WEXIT Continue RIH BHA #2. Wt check @ 9350' - Up wt = 34k &
Run-in wt = 19k. See EOP flag right on depth. Lightly tag
WS/Inr pinch pt @ 9420.4'. PUH 15' & establish free spin @
2.7bpm/1300psi. RBIH & ease in till motor work @ 9419.5.
Flag pipe & start milling window with 1.5ppb bio-KCL fluid.
WEXIT Mill window f/ 9420' - 9425' with 2.6/2.6bpm, 1490/1860psi, <1 k
WOB & lfph ave ROP, Drill formation f/ 9425' to 9430' with
2.62/2.62bpm, 1350/1769psi, <1k WOB & 9fph ave ROP
WEXIT Drill formation f/ 9425' to 9435' with 2.62/2.62bpm,
1350/1769psi, <1k WOB & 9fph ave ROP
WEXIT Dress off Window, Work thru window several times with
pumps, seeing mtr work of 40 psi at top of window 9421',
setting down with pumps off at 9421'
WEXIT Attempted to slide thru window w/o pumps, setting down at
9421', unable to pass thru window with pumps, mtr work
increased to 100 - 150psi, stalled once, worked thru window
with pumps, mtr work of 150 psi f/ 9421' to 9423', washed to
9435', no problems, still seeing 40 psi mtr work ream and
backreaming thru window at 9421'
WEXIT Work thru window several times with pumps, seeing mtr work
of 30-40 psi at top of window 9421', setting down with pumps
off at 9421', roll pumps mill fall off, no problems RIH to btm
once pasted trouble spot, consult with town engineer and wfd
representative, displacing well to Flo-Pro Mud
WEXIT Passing thru window without the pumps sporadically continue
to dress off window, displacing well to Flo-Pro Mud
WEXIT Backream/dress window/rat hole 3x & drift 2x. Window is clean
on backreaming. On 1st down-drift, stacked wt @ +/-9423', roll
pumps & pop into OH. On 2nd down-drift, RIH a bit faster @
15fpm & run thru clean into OH. Suspect W/S is stacking the
mill because it was set in a build curve and/or because it has
some grind-off area on the ramp: Decide to POOH to P/U
drilling BHA. Tentative window depths are: TOWS/TOW =
9420', BOW = 9425', RA PIP Tag = 9428.9'.
WEXIT Paint EOP flag @ 9300' & POOH window milling BHA #2,
while displacing well to mud.
WEXIT OOH. PJSM. S/B injector. UD BHA #2 & inspect mills. Window
mill & string mill gauge 3.79" go / 3.78" no-go. Wear on window
mill face indicate mill center crossed the liner wall.
PROD1 Held pre-spud safety meeting. Reviewed well plan, potential
hazards, drilling BHA M/U procedures & HA/HM for cutting 150'
of CT.
PROD1 M/U drilling BHA #3 with 1.2deg X-treme motor, MWD/GR,
orienter & used Hycalog 3-3/4" x 4-1/4" DS3611 M bicenter bit
#2. Scribe tools & suspend in slips.
PROD1 R/U hydraulic cutter & cut 150' of CT for fatigue management.
Have 16350' of CT left on reel.
PROD1 Rehead & M/U SLB CTC. Pull test to 35k & pressure test to
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Page 3 of 10
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
Date ~ Prom - To ~ Hours ~ Task ~ Code ~ NPT ~ Phase ~ Description of Operations
5/14/2006 10:30 - 11:00 0.50 DRILL P PROD1 3500psi - OK. M/U injector to BHA.
11:00 - 12:40 1.67 DRILL P PROD1 RIH drilling BHA #3. SHT MWD @ 500' & orienter Q 3000'
12:40 - 13:20 0.67 DRILL P
13:20 -.13:30 0.17 DRILL P
13:30 - 13:35 0.08 DRILL P
13:35 - 14:30 0.92 DRILL P
14:30 - 14:40 0.17 DRILL P
14:40 - 15:00 0.33 DRILL P
15:00 - 18:15 3.25 DRILL P
18:15 - 18:20 0.08 DRILL P
18:20 - 18:30 0.17 DRILL P
18:30 - 18:35 0.08 DRILL P
18:35 - 18:40 0.08 DRILL P
18:40 - 18:55 0.25 DRILL P
18:55 - 21:00 2.08 DRILL P
21:00 - 22:30 1.50 DRILL P
22:30 - 23:00 0.50 DRILL P
23:00 - 23:15 0.25 DRILL P
23:15 - 00:00
5/15/2006 00:00 - 03:30
03:30 - 05:05
05:05 - 06:45
06:45 - 07:00
07:00 - 08:30
0.75 DRILL P
3.50 DRILL P
1.58 DRILL N
1.67 DRILL N
0.25 DRILL N
1.50 DRILL N
08:30 - 09:30
09:30 - 11:15
11:15 - 11:40
1.001 DRILL I N
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB IPRODI
1.751 DRILL I N I DPRB I PROD1
0.421 DRILL N I DPRB PROD1
OK. RIH to 9160'.
Log down from 9160' to 9213' & tie-into Geology PDC log.
Subtract 15' from CTD.
RIH clean thru window with pumps down @ LS TF. Tag btm
without pumps @ 9441'. Bring on pumps & establish freespin
C~2 2.65bpm/3050psi. TF =179L. Up wt = 30k, Run-in wt = 18k.
PVT = 281 bbls. IAP = 680psi, OAP = 700psi.
Orient TF 2 clicks to 155L.
Begin drilling drop/build/turn section with 150E TF,
2.65/2.65bpm, 3050/3450psi, 3k WOB & 45fph ave ROP. Drill
to 9469'. Saw RA PIP tag @ 9434'. Correct window depths as
follows: TOWS/TOW = 9425' & BOW = 9430'.
Drill to 9480' with 120E TF, 2.65/2.65bpm, 3050/3450psi, 3k
WOB & 65fph ave ROP.
Orient TF to 70L.
Orient & drill to 9690' with 80-110L TF, 2.65/2.65bpm,
3050/3450psi, 3k WOB & 95fph ave ROP. Meanwhile bleed
down the IAP from 1000psi to 310psi & OAP from 1000psi to
320psi.
Orient TF to 40L.
Drill to 9708' with 50L TF, 2.65/2.65bpm, 3050/3450psi, 3k
WOB & 135fph ave ROP.
Orient TF to 15L.
Drill to 9735' with 25L TF, 2.65/2.65bpm, 3050/3350psi, 3k
WOB & 175fph ave ROP.
Orient TF to90R.
Drill to 9851' with 80R TF, 2.40/2.40bpm, 2800/3150psi, 3k
WOB & 110fph ave ROP.
POH to BHA
POH w/ BHA, LD MWD-GR, mtr, and bit
PJSM on PU and handling steerable Assy, discussed
overlifting, new personnel to operations and good
communication
MU Xbow tools, bit, MWD, Mtr, MHA and CTC
Stab Inj, RIH w/ Xbow steerable assy, tagged up at 9442'
Made several attempts to work passed window without pumps,
PU above window to 9375' 3X, performed 3 downlinks to Xbow
tool to adjust pads in different positions, after each downlink,
shut down pumps, attempted to RIH, unable to work past
window
POH to BHA #4
Held PJSM for UD SLB X-bow BHA.
S/B injector. UD BHA#4. Check bit -had 2 chipped cutters on
the face, grade 2/0/1 (must have tagged up on TOWS).
M/U drilling BHA #5 with 1.2degs X-treme motor,
MWD/GR/RES, orienter & rerun Hycalog 3-3/4" RSX508S61
PDC bit #4. Scribe tools & initialize resistivity tool. M/U injector.
RIH drilling BHA #5. SHT MWD @ 500' & orienter ~ 3000'
OK. Wt check ~ 9400' = Up - 38k, Run-in - 19k. Check TF -
@ 45L. S/D pumps &RIH dry. Tag TOWS @ 9443'.
Bring up pumps & confirm TF C~ 45L. Orient TF around to
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
5/15/2006 11:15 - 11:40
11:40 - 12:00
C-16
C-16
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Hours Task Code j NPT
l-
Start: 5/10/2006
Rig Release: 5/21/2006
Rig Number:
Page 4 of 10
Spud Date: 5/11/1980
End: 5/21 /2006
Phase Description of Operations
0.42 DRILL N DPRB PROD1
0.33 DRILL P PROD1
12:00 - 14:40 I 2.671 DRILL I P I I PROD1
14:40 - 15:00 0.33 DRILL P PROD1
15:00 - 15:15 0.25 DRILL P PROD1
15:15 - 15:50 0.58 DRILL P PROD1
15:50 - 16:05 0.25 DRILL P PROD1
16:05 - 16:10 0.08 DRILL P PROD1
16:10 - 16:30 0.33 DRILL P PROD1
16:30 - 17:10 0.67 DRILL P PROD1
17:10 - 17:30 0.33 DRILL P PROD1
17:30 - 18:25 0.92 DRILL P PROD1
18:25 - 19:05 0.67 DRILL P PROD1
19:05 - 19:45 0.67 DRILL P PROD1
19:40 - 23:05 3.42 DRILL P PROD1
23:05 - 00:00 0.92 DRILL P PROD1
5/16/2006 00:00 - 01:30 1.50 DRILL P PROD1
01:30 - 01:50 0.33 DRILL P PROD1
01:50 - 02:30 0.67 DRILL P PROD1
02:30 - 02:40 0.17 DRILL P PROD1
02:40 - 03:00 0.33 DRILL P PROD1
03:00 - 03:20 0.33 DRILL P PROD1
03:20 - 04:10 0.83 DRILL P PROD1
04:10 - 04:30 0.33 DRILL P PROD1
04:30 - 05:05 0.58 DRILL P PROD1
05:05 - 05:55 0.83 DRILL P PROD1
05:55 - 06:30 0.58 DRILL P PROD1
06:30 - 06:50 0.33 DRILL P PRODi
06:50 - 08:00 I 1.171 DRILL I P I I PROD1
08:00 - 08:10 0.17 DRILL P PROD1
08:10 - 09:15 1.08 DRILL P PROD1
09:15 - 09:30 0.25 DRILL P PROD1
09:30 - 10:45 1.25 DRILL P PROD1
165R.
RIH with pumps down @ 165R TF & 15fpm. Saw slight wt
bobble @ 9443' & bounce thru window into OH. Tag btm
without pumps ~ 9866'. Correct CTD to 9851'. Establish
freespin @ 2.65bpm/3100psi. TF = 145R. Up wt = 30k, Run-in
wt = 18k. PVT = 270bb1s. IAP = 55psi, OAP = 220psi.
MAD pass real time resistivity data from 9851' to 9650'
75fph. MAD pass C~3 100fpm to window. Log up & tie-into RA
Pip tag with 0' correction.
RBIH to btm tagged @ 9851'.
Orient & drill to 9874' with 65R TF, 2.65/2.65bpm,
3100/3850psi, 3k WOB & 135fph ave ROP.
Orient TF around to 40R.
Drill to 9890' with 65R TF, 2.65/2.65bpm, 3100/3650psi, 3k
WOB & 135fph ave ROP.
Orient TF around to 100R.
Drill to 9930' with 95-135R TF, 2.65/2.65bpm, 3100/3450psi, 3k
WOB & 135fph ave ROP.
Orient TF around to 60R.
Drill to 10000' with 65R TF, 2.65/2.65bpm, 3100/3450psi, 5k
WOB & 155fph ave ROP.
Orient & drill to 10062' with 100R TF, 2.65/2.65bpm,
3250/3850psi, 4k WOB & 90fph ave ROP.
Wiper trip to window, RIH back to btm, no problems
Orient TF to 106 R
Drill to 10200' with 86R TF, 2.61/2.61bpm, 3512/3867psi, FS
3122 psi, 2k WOB & 90fph avg ROP.
Wiper trip to window, RIH back to btm, no problems
Orient and Drill to 10254' w/ 80R TF, 2.65 bpm, 3585 psi
Orient TF around to 50 R
Drld w/ 35R TF, 2.55 bpm, 3500 psi
Orient TF to 70 R
Drld w! 65R TF, 2.65 bpm, 3550 psi
Orient TF to 70 L
Drld w/ 65L TF, 2.50 bpm, 3430 psi
Orient TF to 140 L
Drld w/ 151 L TF, 2.60 bpm, 3525 psi
Wiper Trip and Tie-in Pass, +7 correction
RIH & set down @ 10194'. P/U & run thru. Tag btm @ 10357'.
Orient & drill to 10376' with 110E TF, 2.65/2.65bpm,
3350/3650psi, 2k WOB & 90fph ave ROP. Bumped into the
14N shale @ 10310'. Will drill down to exit from the 14N.
Orient & drill to 10440' with 140E TF, 2.65/2.65bpm,
3350/3650psi, 12k WOB & 50fph ave ROP. Exit the 14N shale
C~ +/-10420'
Orient TF around to 70L.
Drill to 10500' with 35-15L-30R TF, 2.65/2.65bpm,
3350/3750psi, 4k WOB & 90fph ave ROP. Meanwhile swap
well to new 8.6ppg flopro mud. TF is rolling right.
Drill to 10520' with 15R TF, 2.65/2.65bpm, 3000/3450psi, 3k
WOB & 80fph ave ROP.
Wiper trip clean to window. RBIH & set down in shale @
10133'. P/U & run thru to btm.
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Page 5 of 10
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
Date ~ From - To Hours Task ~ Code NPT ~ Phase ~ Description of Operations
1-_ _~ _ !_ __
5/16/2006 10:45 - 10:55 0.17 DRILL P PROD1 Orient TF around to 70L.
10:55 - 12:20 1.42 DRILL P PROD1 Drill to 10575' with 15R TF, 2.65/2.65bpm, 3000/3150psi, 3k
WOB & 90fph ave ROP.
12:20 - 14:20 2.00 DRILL P PROD1 Drilled to 10625', Orient to 90L, Drilled to 10,700'.
14:20 - 15:45 1.42 DRILL P PROD1 Wiper trip from 10700', up wt. 33000 lbs.
15:45 - 16:00 0.25 DRILL P PROD1 Orient TF to 90R.
16:00 - 17:00 1.00 DRILL P PROD1 Drilling Z1 B Lateral, 2850-3400 psi, 2.7 bpm, 90R, Drilled to
10,766'.
17:00 - 17:15 0.25 DRILL P PROD1 Orient TF to 30R.
17:15 - 19:00 1.75 DRILL P PROD1 Drilling Z1 B Lateral, 2850-3400 psi, 2.7 bpm, 30R, Drilled to
10,857'.
19:00 - 20:00 1.00 DRILL P PROD1 Wiper to window 9490'.
20:00 - 20:20 0.33 DRILL P PRODi Tie-in correction = +14'.
20:20 - 21:40 1.33 DRILL P PROD1 Wiper back to TD Ratty at 10190. Set down at 10357 (14N
shale) got to 10838 No Go. Make 100 short wiper. ratty form
10838 to 10870'.
21:40 - 22:15 0.58 DRILL P PROD1 Orient to 127R. Hole remains ratty 10840 to TD
22:15 - 23:20 1.08 DRILL P PROD1 Drill 2.7/ 2.7 bpm at 3030 psi. Drill to 10955. Bluffing shales in
returns possible 14N.
23:20 - 23:30 0.17 DRILL P PROD1 Orient to 104R.
23:30 - 00:00 0.50 DRILL P PROD1 Drill 2.62/ 2.61 bpm C~ 3160 psi FS = 2900 psi Surface wt 5K,
ROP 150. Drilled to 11,000'.
5/17/2006 00:00 - 01:45 1.75 DRILL P PROD1 Wiper to window. Large amounts of splintered shale in returns
continuously on trip .Ratty below 10780. Set down at 10813.
Ratty to 10,870'.
01:45 - 04:20 2.58 DRILL P PROD1 Directionally drill 2.6/2.6 at 3050 psi, Surface wt 5K, ROP90,TF
89R.Currently drilling in Z-2A. Will maintain 88 degrees.
04:20 - 06:30 2.17 DRILL P PROD1 Wiper to window, Ratty 10500 - 10600. 10873-11,100'.
Ream down thru 14N shales in this area. 38K up wt.
06:30 - 08:30 2.00 DRILL P PROD1 Not able to get wt to bit on bottom, backream 14N shales with
10-20K overpulls from 10900-10700'.
Back ream up to window again. Unloading caving shales from
reaming.
08:30 - 09:30 .1.00 DRILL P PROD1 Pull thru window clean and backream up to 9000'. Circ. 30 bbl
very high vis FloPro pill to bit and chase out from 9400'.
09:30 - 11:30 2.00 DRILL P PROD1 POH to lay out RES tool. Circ. at full rate all the way out of
hole. Had extra shale on shaker from HV sweep. Had extra
shale when BHA reached surface.
11:30 - 11:45 0.25 DRILL P PROD1 SAFETY MEETING. Reviewed procedure, hazards and
mitigation for laying out BHA and Testing new design Little Jerk
torque tool.
11:45 - 13:45 2.00 DRILL P PROD1 UO BHA. Download RES data. UO RES tool. M/U used HYC
DSX49H Bit #5. C/O MWD probe, check orienter, C/O MHA.
OAL = 66.94'.
Hycalog Bit #4 gradded at [ 8,2,1]. Bit was rung out in middle
row, Bit does not have back reamers.
13:45 - 15:45 2.00 DRILL P PROD1 RIH with lateral MWD BHA #6 with 1.2 deg motor. SHT tools
and orienter OK. RIH.
Ran thru window clean with 138R TF. RIH to 9485'.
15:45 - 16:15 0.50 DRILL P PROD1 Log GR tie-in at RA tag at 9,434'. -15' CTD.
16:15 - 18:30 2.25 DRILL P PROD1 RIH, swap well to 9.6 PPB new FloPro with 4% LT and 14 PPB
KlayGard, while RIH. Clean hole down to 10770'.
Ream shales with new FloPro at 10 FPM. Sat down at 10,810',
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: C-16
Common Well Name: C-16
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date ~ From - To Hours ~ Task Code
--_ - - ,
5/17/2006 16:15 - 18:30 2.25 ~ DRILL P
18:30 - 18:45 0.25 DRILL P
18:45 - 19:00 0.25 DRILL P
19:00 - 20:45 1.75 DRILL P
20:45 - 00:00 I 3.251 DRILL I P
5/18/2006 00:00 - 00:30 0.50 DRILL P
00:30 - 02:00 1.50 DRILL P
02:00 - 02:30 I 0.501 DRILL I P I I PROD1
02:30 - 03:00 0.50 DRILL N DPRB PROD1
03:00 - 04:45 1.75 DRILL P PROD1
04:45 - 05:15 0.50 DRILL P PROD1
05:15 - 06:00 0.75 DRILL P PROD1
06:00 - 08:30 I 2.501 DRILL I P I I PROD1
08:30 - 10:30 I 2.001 DRILL I P I I PRODi
10:30 - 11:15 I 0.751 DRILL I P I I PRODi
11:15 - 14:15 I 3.001 DRILL I P I I PROD1
14:15 - 16:15 I 2.001 DRILL I P I I PROD1
16:15 - 17:00 I 0.751 DRILL I P I I PROD1
Start: 5/10/2006
Rig Release: 5/21/2006
Rig Number:
Page 6 of 10
Spud Date: 5/11 /1980
End: 5/21 /2006
Description of Operations
10830', Backream up to 10500'. RIH and ream down thru 14N
shales. RIH to 11155.
Drill 2.56 /2.56 bpm at 3550 psi. Drill to 11185'
Orient to 87R.
Drill 2.54 / 2.54 bpm @ 3560 psi. FS + 3200 psi. Surface wt
5K, ROP 90, drill to 11199. ROP change. GR spike. Continue
drilling to 11300'
Wiper over pulls and motor work ing in the 14N shale 10880 to
10690.10-30K over normal. Over pull 10400 thru 10350 pulled
30K over and stalled motor@ 10358. Extensive amount of
scale across screens 3/16 "diameter .Trip back in no set down
but did see negative surface weights in 14N shale. Set down at
11196'. Orient 40R
Orient 45R
Drill 2.5/2.5 bpm @ 3460 psi, surface wt 0, ROP 100+, 104R.
drill to 11450
Wiper to window. 10802 over pull and kick out at 76K. Stuck
mechanical
Work pipe free. Called TD at 11,450'
Wiper to window. Frequent over pull throughout well bore.
Large shale pieces periodically over shaker 0.5" diameter.
POH to 9480'.
Tie-in correction = +21.5'.
RIH set down 10390 lost ground to 10349 . Set down 10370,
10388, 10,450, RIH to 10,600' OK.
Wiper to 9000' to chase out shales in hole. Overpull at 10460
and 10000,
Circ. 30 bbl very high vis pill to chase out cuttings. RIH to
10410', stack full wt, backream with overpulls to 60K.
Some caving shale up with HV sweep,
RIH and stack wt at 10440'. Ream shales. RIH clean to
10730', Ream down to 10810', ream thru shale in 1/2 hour.
RIH to 11200' below 14N shale and pump 30 bbl high vis
FloPro sweep. RIH while circ sweep. 2.2 bpm, 3050 psi.
Tag Finale TD at 11,465'.
Circ. hole while mixing 20 bbl, high wt, 12.5 PPG FloPro pill to
clean openhole.
37K up wt, 8K down wt, off bottom.
Did not see any extra cuttings at surface from sweep.
Circ. 20 bbl, 12.5 ppg, high Wt FloPro pill to clean openhole.
Pull up hole from TD of 11,465', 10 FPM, 2.8 bpm, 3400 psi.
RIH at 10 fpm while circ pill in openhole. Backream up slow at
10 fpm, overpull to 60K at 10,895, 10870, 10845, and 10800'
in lower 14N shale. Not to bad.
Pull clean up to 10450 and 10370', 10K overpull, had 20K
overpull at 10360'. Backreamed up thru it OK.
Pull clean up to window. Puil clean thru window. Up wt = 32K.
POH to run liner. Flag coil at 9200' EOP and 7200' EOP.
POH, circ at 2.8 bpm, full returns.
Saw extra shale on shaker when we pulled the BHA up to 500'.
Pulled slow to surface until shale quit, estimated 1 bbl of shale
cuttings, there is a total of 10 bbls of shale in the cuttings tank.
UO MWD BHA.
NPT ' Phase
_-
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION Page 7 of 10
Operations Summary Report
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours ; Task Code ~ NPT Phase Description of Operations
5/18/2006 17:00 - 18:45 1.75 CASE P RUNPRD Cut off SWS CTC and 25' of coil. M/U BOT CTC. Pull /Press
test.
Pump dart. 2.5 bpm, 1900 psi. Dart on seat at 65.8 bbl
theoretical 66.8 bbls.
18:45 - 19:00 0.25 CASE P RUNPRD PJSM for picking up liner. Pinchpoints associated with the side
door elevators. Over head loads, Falling ice from derrick.
Watch out for your fellow workers. Watch for trapped item
along side of the catwalk while adjusting the height of catwalk.
19:00 - 22:00 3.00 CASE P RUNPRD Pu 2-7/8" x 3-3/16 liner.
22:00 - 00:00 2.00 CASE P RUNPRD RIH. to flag at 7200' EOP. Up Wt 38K. DN Wt 16K. RIH thru
window No problem. Continue to RIH Set down at 10508,10570
10603 106585, 10767. Circulate at 1.4 bpm at 2000 psi.
5/19/2006 00:00 - 06:15 6.25 CASE P RUNPRD Pop thru. Circulate at .16 bpm @ 850 psi. RIH. Set down at
10800, 10817, Cirulate at 1.3 bpm at 1760 psi.PU set down
10824' Circulate .17 bpm PU. No Go pat 10825, Circulate at
1.5 bpm C~ 1860 psi,00:20 hrs, POP free 00:30 Set down at
10832, Set down 10856, -12K DN WT. Pu Set Dn 10858. Pu
Set Dn 10859, PU Set DN 10860, Set Dn 10864, Circulate 1.5
bpm @ 1835 psi, Up Set Dn at 10880, Set DN
10910,10920,Circulate 1.5 bpm, set Down 11000,11044,
Circulate 1.4 bpm 1900 psi, PU, Set Dn 11065, Pu, Set Dn
11061, 11104,11152, Circulate 1,5 bpm,1900 psi, PU Set Dn
11151,11174,11198,11208, 11230, Circulate 1.5 bpm, Pu, Set
do 11246, 11262, 11279, Circulate, Pu set do at 11304,11316,
Circulate, 1.5 bpm, Set down 11342, Circulate,Set down
11362, Circulate Set down 11374, 11378, Circulate 1.5 bpm,
set down 11405,11420,11437, Circulate 1.5 bpm, Work liner to
11473'.
Liner is landed at TD of 11,465'.
06:15 - 07:15 1.00 CASE P RUNPRD Insert 5/8" AL ball. Displace with FloPro. 2.5 bpm, 2900 psi.
Slow pump at 40 bbls to 0.8 bpm. Ball on seat at 56.8 bbls.
Released at 3800 psi. Pick up and prove coil was free from
liner.
07:15 - 10:00 2.75 CEMT P RUNPRD Circ. well to 9.5 PPG KCL water, recover used FloPro and
return to MI. 2.6 bpm, 2700 psi, full returns.
10:00 - 11:30 1.50 CEMT N WAIT RUNPRD Circ. while waiting for SWS cementers. SWS was not able to
get mix water in truck until 0700 hrs, the equipment was on
other jobs. Wait on UCA cement testing before pumping
cement.
11:30 - 12:15 0.75 CEMT P RUNPRD Rig up cementing equipment and hardline.
12:15 - 12:30 0.25 CEMT P RUNPRD SAFETY MEETING. Review procedure, hazards and
mitigation for pumping cement job with SWS and Nordic
personnel.
12:30 - 12:45 0.25 CEMT P RUNPRD Pressure test cementing line and equipment with 3800 psi.
UCA indicated good cement with thickening time of 3hrs, 54
min.
12:45 - 13:25 0.67 CEMT P RUNPRD Stage 30 bbls, 15.8 ppg, Class G cement,
15 bbls, 2.4 bpm, 2480 psi, 15.9 ppg, full returns.
30 bbls, 2.4 bpm, 2500 psi, 15.9 ppg, full returns.
Stop cement pump. Isolate coil. Clear cement line. Pump
Biozan water to reel.
Insert BOT dart. Zero micro in and out.
13:25 - 14:15 0.83 CEMT P RUNPRD Stage 30 bbls, 2# Biozan behind dart, 2.6 bpm, 2770 psi.
Printetl: 5/22/2006 11:58:05 AM
BP EXPLORATION Page 8 of 10
Operations Summary Report
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
Date ~ From - To Hours ~ Task ~ Code ' NPT Phase Description of Operations
5/19/2006 13:25 - 14:15 0.83 CEMT P RUNPRD 10 bbl displ, 2.6 bpm, 2400 psi, full returns
20 bbl displ, 2.5 bpm, 1700 psi, full returns.
28 bbl displ, 2.5 bpm, 1000 psi, full returns, swap to 9.5 #
KCL water
40 bbl displ, 2.5 bpm, 750 psi, full returns, lead cmt at top of
liner
48.3 bbl displ, 2.5 bpm, 1400 psi, cement at shoe, zero return
micro
58 bbl displ, shales starting to pack off, slow pump to 1.5 bpm,
2260 psi, 50% returns
60 bbl displ, 1.5 bpm, 2800 psi, 0.2 bpm returns, 10.8 bbls
around shoe.
66.3 bbls, dart on LW P, sheared plug at 4400 psi.
Displace LW P, liner cap = 12.3 bbls.
70 bbl displ, 1.9 bpm, 3000 psi, no returns, total returns =
11.5 bbls.
74 bbl displ, 1.0 bpm, 2400 psi, no returns,
77 bbl displ, 1.0 bpm, 2300 psi, no returns,
77.9 bbl, bumped LW P, held 2800 psi, steady pressure. 11.5
bbls total returns.
Bleed press, check floats, OK.
Deployment sleeve [3.70" OD] is fully packed off with shale /
cmt inside 4-1l2" Liner [3.96" ID]
Press up 500 psi, pick up and sting out of liner top clean,
regain circulation.
14:15 - 16:00 1.75 CEMT P RUNPRD POH, pump 0.6 bpm, with 0.1 bpm returns.
16:00 - 16:45 0.75 CEMT P RUNPRD UO BOT liner running tools.
16:45 - 17:00 0.25 EVAL P LOWERI SAFETY MEETING. Review procedure, hazards and
mitigation for M/U SWS Memory CNUGR logging tools and
motor and mill.
17:00 - 18:45 1.75 EVAL P LOW ER1 M/U 2.30" Diamond PB Mill, 2-1/8" motor, 2 jts CSH, SWS
carrier, BOT Circ sub, BOT Hyd Disc, 68 jts CSH and MHA.
OAL = 2209.1'.
18:45 - 20:00 1.25 EVAL P LOWERI RIH with logging tool to 8800'.
20:00 - 21:40 1.67 EVAL P LOWERI Log at 30 ft/min from 8800'. to TD 11431. Finish spotting pert
pill.
21:40 - 22:30 0.83 EVAL P LOWERI Log up at 60 fpm. to 8800'.
22:30 - 23:30 1.00 EVAL P LOWERI POH to CSH.
23:30 - 00:00 0.50 EVAL P LOW ER1 Stand back 34 stands of
5/20/2006 00:00 - 01:30 1.50 EVAL P LOWERI Continue to standback 34 stands of 1-1/4" CS Hydril.
01:30 - 01:45 0.25 EVAL P LOW ER1 PJSM for LD memory tool and RA source.
01:45 - 02:00 0.25 EVAL P LOW ER1 LD memory logging tools.
02:00 - 03:00 1.00 EVAL P LOWERI Flush stack with swizzelstick.
03:00 - 03:45 0.75 EVAL P LOWERI Test Liner Lap to 2000 psi. NO Test.
03:45 - 04:45 1.00 EVAL P LOWERI Function test BOP.
PBTD from MCNUGR = 11,420'. Will perf off of this depth.
04:45 - 05:00 0.25 PERFO P LOW ER1 PJSM for PU perf guns.
05:00 - 06:15 1.25 PERFO P LOW ER1 PU first set of perf guns.
06:15 - 06:30 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and
mitigation for running SWS perf guns.
06:30 - 09:00 2.50 PERFO P LOWERI Continue running SWS 2" perf guns. M/U BOT Hyd Disc, 19
stds CSH and MHA. OAL = 2,148.13'.
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION
Operations Summary Report
Page 9 of 10
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
i
Date ;From - To Hours , Task j Code NPT Phase Description of Operations
5/20/2006 ~ 09:00 - 11:00 ~ 2.00 PERFO P
11:00 - 12:40 ~ 1.67
5/21 /2006
12:40 - 14:45 I 2.081 P
14:45 - 15:15 0.50 P
15:15 - 15:30 0.25 P
15:30 - 17:45 2.25 P
17:45 - 18:30 0.75 P
18:30 - 18:45 0.25 P
18:45 - 19:30 0.75 P
19:30 - 20:15 0.75 P
20:15 - 21:45 1.50 P
21:45 - 22:40 0.92 P
22:40 - 00:00
00:00 - 01:15
01:15 - 01:30
01:30 - 02:45
02:45 - 04:00
04:00 - 04:30
04:30 - 06:30
06:30 - 08:30
1.33 PERF~
1.25 PERF~
0.25 PERF~
1.25 PERF~
1.25 PERFi
0.50 CASE
2.00 CASE
2.00 CASE
08:30 - 09:30
1.001 CASE
P
P
P
P
P
P
P
P
P
P
P
P
LOWERI RIH, pump min. rate at 0.2 bpm, 70 psi.
RIH and tag PBTD at 11,425' and correct to 11,420' PBTD from
MCNUGR log. [-5'].
LOWERI Circ. 10 bbls new FloPro pert pill. Insert 1/2" AL ball and pump
5 bbls FloPro behind.
Position bottom of guns at PBTD at 11,420'. Displace with
KCL water at 1.8 bpm at 2360 psi.
Ball on seat at 67 bbls. Pull slow and fire guns at 3100 psi.
Good fire indication. No overpull.
Continue POH at 40 fpm, 0.7 bpm, 37K up wt.
Flag coil at 8000' EOP. CTD was tied-in with PBTD of 11,420'
picking up.
LOWERI POH with fired pert guns, Run #1.
Flow check well at surface. Well is dead.
LOWERI Stand back 19 stds of CSH.
LOWERI SAFETY MEETING. Review procedure, hazards and
mitigation for laying out fired SWS pert guns.
LOW ER1 Lay out fired pert guns and blanks.
LOW ER1 Load pert guns into pipe shed for Gun run #2.
LOW ER1 PJSM for picking up guns. Watch for pinchpoints in crumy
elevators and safety pin in elevators. Also on thehandling sub
fo the gunn and snap ring installation on guns.
LOWERI PU 20 guns.
LOWERI PU 19 stands of CSH.
LOWERI RIH pumping min rate .3 bpm @ 77 psi. RIH to EOP flag at
8800 + BHA 1615 = 9615. Correction = -12'.
LOWERI Circ. 10 bbls new FloPro pert pill. Insert 1/2" AL ball and pump
8 bbls FloPro behind.
Position bottom of guns at PBTD at 10,020'. Displace with
KCL water at 1.8 bpm at 2020 psi.
Ball on seat at 65.4 bbls. Pull slow and fire guns at 2700 psi.
Good fire indication. No overpull.
Continue POH at 40 fpm, 0.7 bpm, 33K up wt.
LOW ER1 POH to surface.
LOWERI Stand back 19 stands of CSH.
LOWERI PJSM for laying down perforating guns.
LOWERI LD 20 perforating guns.
LOW ER1 Clear floor. Load out spent guns.
RUNPRD Pu liner top packer BHA.
RUNPRD RIH with liner top packer.
RUNPRD Stung seals in at 8382' and Set down at 9387.5' with 10K wt.
Pull out to circ. Insert 5/8" AL ball. Displace ball with KCL
water.
Ball on seat at 58.7 bbls. RIH. Not able to sting back into
deployment sleeve. Work up /down several times. Setting up
at 9378'. Not able to circ due to ball on seat. Pickup and
pump down backside to try and sting in. Set down several
times. Well taking fluid at 0.3 bpm at 1100 psi. Reverse Circ.
ball up to surface. Hear ball in reel.
RUNPRD Sting into deployment sleeve while pumping down coil at 1.5
bpm. Set down 10K at 9387 ft. Seal assembly is inside PBR.
Pick up to free point and pick up 1 ft above landing depth to
Printed: 5/22/2006 11:58:05 AM
BP EXPLORATION Page 10 of 10
Operations Summary Report
Legal Well Name: C-16
Common Well Name: C-16 Spud Date: 5/11/1980
Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006
Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006
Rig Name: NORDIC 1 Rig Number:
I i
Date ~ From - To 'Hours Task Code NPT Phase Description of Operations
__ _ _____
5/21/2006 ~ 08:30 - 09:30 1.00 CASE RUNPRD 9379.7'. Pump ball on seat.
Ball on seat at 46 bbls. Press up to 2000 psi and set packer
slips. Stack wt back to 10K at 9384.3'. So slips are holding.
Pickup to 33K.
09:30 - 10:15 0.75 CASE RUNPRD Pressure test Packer seals with 2000 psi on backside of coil.
Chart 30 min test.
Good test. 2000 psi start, 1950 psi end. Bleed off press.
Press up to 3400 psi and released packer running tool. Full
returns again.
Pickup with no overpull.
10:15 - 11:30 1.25 CASE RUNPRD POH to 2400'. circ. 1 bpm while POH.
11:30 - 12:00 0.50 CASE RUNPRD Freeze protect 4-1/2" tubing from 2400-0 ft with 30 bbls MEOH.
12:00 - 12:45 0.75 CASE RUNPRD Lay out BOT liner running tools. Close Master and Swab
valves.
12:45 - 14:00 1.25 WHSUR POST PJSM. Pump 10 bbl MEOH in coil. Displace with N2 to tiger
tank. 2000 CFM for 18 min. Bleed down coil press.
Clean cuttings tank with supersucker. Clean rig pits.
14:00 - 16:00 2.00 RIGD POST M/U internal CTC. Pull test. Pull coil stub to reel. Secure coil
on reel with chains and crossbar.
16:00 - 20:00 4.00 RIGD POST Nipple down BOPE. UP tree cap and test. Release rig at 20:00
hrs.
Printed: 5/22/2006 11:58:05 AM
i ~
Halliburton Company
Survey Report
Company: BP Amoco Date: 6/6/2006 Time: 08`.33:35 Page: l
Field; Prudhoe Bay : Co-ordinate(NE) Reference: Welf: C=16, True North
Site: PB C Pad Vertical (TVD) Reference: C-16B 61.$
Well: C-16 Section (VS) Reference: Well (O.OON,O.OOE,205.OOAzi)
Wellpath; C-16B Survey Calcutation,Method': Minimum Curvature Db: .Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005
Well: C-16 Slot Name: 16
C-16
Well Position: +N/-S 3844.48 ft Northing: 5961098.00 ft Latitude: 70 18 0.176 N
+E/-W 1663.59 ft Easting : 6641 30.00 ft Longitude: 148 40 14.299 W
Position Uncertainty: 0.00 ft
Survey
MD Incl Azim TVD Sys TVD: N/S E/W MapN MapE Toof
ft deg deg ft ft ft ft ft ` ft _
28.77 0.00 0.00 28.77 -33.00 0.00 0.00 5961098.00 664130.00 TIE LINE
102.57 0.55 182.10 102.57 40.80 -0.35 -0.01 5961097.65 664129.99 BOSS-GYRO
202.57 0.63 201.69 202.56 140.79 -1.34 -0.23 5961096.65 664129.79 BOSS-GYRO
302.57 0.78 199.10 302.56 240.79 -2.50 -0.66 5961095.49 664129.39 BOSS-GYRO
402.57 1.00 200.69 402.54 340.77 -3.96 -1.19 5961094.02 664128.89 BOSS-GYRO
502.57 1.82 193.50 502,51 440.74 -6.32 -1.87 5961091.64 664128.27 BOSS-GYRO
602.57 2.08 187.60 602.45 540.68 -9.66 -2.48 5961088.29 664127.73 BOSS-GYRO
702.57 2.20 184.00 702.39 640.62 -13.37 -2.85 5961084.57 664127.44 BOSS-GYRO
802.57 1.82 188.19 802.32 740.55 -16.86 -3.21 5961081.07 664127.15 BOSS-GYRO
902.57 1.32 202.19 902.29 840.52 -19.50 -3.88 5961078.42 664126.55 BOSS-GYRO
1002.57 1.02 203.29 1002.27 940.50 -21.38 -4.66 5961076.52 664125.80 BOSS-GYRO
1102.57 1.00 194.79 1102.25 1040.48 -23.05 -5.24 5961074.85 664125.27 BOSS-GYRO
1202.57 0.87 169.31 1202.24 1140.47 -24.63 -5.32 5961073.26 664125.22 BOSS-GYRO
1302.57 0.83 155.50 1302.23 1240.46 -26.04 -4.88 5961071.86 664125.69 BOSS-GYRO
1402.57 0.72 125.41 1402.22 1340.45 -27.06 -4.07 5961070.86 664126.53 BOSS-GYRO
1502.57 0.85 117.41 1502.21 1440.44 -27.77 -2.90 5961070.18 664127.71 BOSS-GYRO
1602.57 0.63 99.50 1602.20 1540.43 -28.20 -1.69 5961069.77 664128.92 BOSS-GYRO
1702.57 0.43 86.30 1702.20 1640.43 -28.27 -0.78 5961069.72 664129.84 BOSS-GYRO
1802.57 0.28 112.81 1802.19 1740.42 -28.34 -0.18 5961069.67 664130.44 BOSS-GYRO
1902.57 0.37 156.70 1902.19 1840.42 -28.73 0.17 5961069.28 664130.80 BOSS-GYRO
2002.57 0.57 158.70 2002.19 1940.42 -29.49 0.48 5961068.53 664131.13 BOSS-GYRO
2102.57 0.72 158.70 2102.18 2040.41 -30.54 0.89 5961067.49 664131.56 BOSS-GYRO
2202.57 0.88 148.90 2202.17 2140.40 -31.78 1.52 5961066.26 664132.21 BOSS-GYRO
2302.57 0.67 159.20 2302.16 2240.39 -32.98 2.12 5961065.07 664132.84 BOSS-GYRO
2402.57 1.22 143.11 2402.15 2340.38 -34.38 2.97 5961063.69 664133.72 BOSS-GYRO
2502.57 1.25 127.50 2502.13 2440.36 -35.90 4.47 596106221 664135.25 BOSS-GYRO
2602.57 1.40 124.81 2602.10 2540.33 -37.26 6.34 5961060.89 664137.15 BOSS-GYRO
2702.57 1.32 115.61 2702.07 2640.30 -38.45 8.38 5961059.74 664139.22 BOSS-GYRO
Wellpath: C-166 Drilled From: C-16AP61
500292043802 Tie-on Depth: 9406.46 ft
Current Datum: C-16B Height 61.77 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/15/2006 Declination: 24.53 deg
Field Strength: 57606 nT Mag Dip Angle: 80.89 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.77 0.00 0.00 205.00
Survey Program for Defmitive Wellpath
Date: 3/9/2006 Validated: Yes Version: 3
Actual From To .Survey Toolcode Tool Name
ft ft
102.57 9002.57 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot
9040.00 9406.46 C-16AP61 IIFR (9040.00-9781.03 MWD+IFR+MS MWD +IFR + Multi Station
9425.00 11465.00 MWD (9425.00-11465.00) MWD MWD -Standard
•
Halliburton Company
Survey Report
Company: BP Amoco Date: 6/6/2006 Tim e: 08:33:35 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference:. ` Well: C-16, True. North
Site: PB C Pad Vertical (TVD) Reference: G-16661.8
Well: G-16 Section (VS) Reference: ' Well (O.OON,O:OOE,205.OOAzi)
Wellpathd C-166 Survey Calculatlon Metbod: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys TVD
ft deg deg ft ft
2802.57 1.50 40.70 2802.05 2740.28
2902.57 4.97 44.79 2901.87 2840.10
3002.57 6.97 23.60 3001.34 2939.57
3102.57 7.73 4.80 3100.53 3038.76
3202.57 9.00 16.50 3199.47 3137.70
3302.57 13.63 25.00 3297.51 3235.74
3402.57 16.63 34.50 3394.05 3332.28
3502.57 18.23 36.90 3489.45 3427.68
3602.57 19.63 36.40 3584.04 3522.27
3702.57 21.47 36.70 3677.67 3615.90
3802.57 23.58 36.90 3770.04 3708.27
3902.57 25.47 37.90 3861.01 3799.24
4002.57 26.78 38.00 3950.80 3889.03
4102.57 29.18 38.00 4039.10 3977.33
4202.57 31.53 37.90 4125.39 4063.62
4302.57 33.50 37.70 4209.71 4147.94
4402.57 34.42 38.00 4292.65 4230.88
4502.57 33.57 38.00 4375.56 4313.79
4602.57 32.42 38.70 4459.43 4397.66
4702.57 31.30 40.00 4544.36 4482.59
4802.57 30.57 43.00 4630.14 4568.37
4902.57 29.88 45.50 4716.55 4654.78
5002.57 29.22 47.90 4803.54 4741.77
5102.57 29.75 51.40 4890.60 4828.83
5202.57 31.08 54.40 4976.84 4915.07
5302.57 28.38 56.40 5063.67 5001.90
5402.57 26.88 58.70 5152.27 5090.50
5502.57 26.63 60.90 5241.56 5179.79
5552.57 23.87 58.90 5286.78 5225.01
5602.57 21.00 59.59 5332.99 5271.22
5652.57 19.22 58.29 5379.94 5318.17
5702.57 19.18 58.70 5427.16 5365.39
5802.57 18.37 59.29 5521.84 5460.07
5902.57 16.07 63.20 5617.36 5555.59
6002.57 14.65 63.50 5713.78 5652.01
6102.57 12.18 63.90 5811.04 5749.27
6202.57 10.65 63.40 5909.06 5847.29
6302.57 9.53 63.29 6007.52 5945.75
6402.57 8.85 64.80 6106.23 6044.46
6502.57 7.78 65.90 6205.18 6143.41
6602.57 6.72 65.69 6304.38 6242.61
6702.57 5.87 67.00 6403.77 6342.00
6802.57 5.00 67.90 6503.32 6441.55
6902.57 3.83 70.00 6603.03 6541.26
7002.57 3.32 64.90 6702.83 6641.06
7102.57 2.45 58.59 6802.70 6740.93
7202.57 1.67 46.79 6902.64 6840.87
7302.57 1.20 61.20 7002.61 6940.84
7402.57 0.73 39.70 7102.59 7040.82
7502.57 0.30 40.50 7202.59 7140.82
7602.57 0.22 293.71 7302.59 7240.82
7702.57 0.42 281.50 7402.59 7340.82
N/S E/W MapN
ft ft ft
-37.96 10.27 5961060.28
-33.89 14.18 5961064.43
-25.26 19.66 5961073.18
-12.99 22.66 5961085.51
1.21 25.44 5961099.77
19.40 32.65 5961118.11
41.88 45.74 5961140.87
66.18 63.23 5961165.54
92.21 82.59 5961191.99
120.41 103.50 5961220.63
151.08 126.45 5961251.79
184.04 151.67 5961285.30
218.76 178.75 5961320.60
255.73 207.63 5961358.19
295.58 238.71 5961398.70
338.05 271.65 5961441.88
382.16 305.92 5961486.72
426.22 340.35 5961531.52
468.93 374.13 5961574.95
509.75 407.59 5961616.49
548.25 441.63 5961655.73
584.31 476.74 5961692.54
618.13 512.62 5961727.14
649.98 550.12 5961759.79
680.48 590.51 5961791.17
708.67 631.30 5961820.24
733.57 670.41 5961845.98
756.21 709.31 5961869.47
766.89 727.77 5961880.55
776.65 744.16 5961890.67
785.51 758.89 5961899.85
794.11 772.91 5961908.74
810.69 800.49 5961925.92
824.98 826.40 5961940.77
836.86 850.07 5961953.17
847.15 870.87 5961963.91
855.92 888.60 5961973.07
863.78 904.26 5961981.27
870.78 918.62 5961988.58
876.82 931.76 5961994.90
881.99 943.27 5962000.32
886.40 953.31 5962004.95
890.04 962.05 5962008.77
892.82 969.23 5962011.71
895.19 974.99 5962014.21
897.53 979.43 5962016.65
899.64 982.32 5962018.82
901.14 984.30 5962020.37
902.14 985.62 5962021.39
902.83 986.20 5962022:09
903.10 986.20 5962022.37
903.25 985.66 5962022.50
MapE Tool
ft
664141.10 BOSS-GYRO
664144.92 BOSS-GYRO
664150.21 BOSS-GYRO
664152.93 BOSS-GYRO
664155.40 BOSS-GYRO
664162.21 BOSS-GYRO
664174.81 BOSS-GYRO
664191.77 BOSS-GYRO
664210.55 BOSS-GYRO
664230.84 BOSS-GYRO
664253.11 BOSS-GYRO
664277.60 BOSS-GYRO
664303.91 BOSS-GYRO
664331.98 BOSS-GYRO
664362.17 BOSS-GYRO
664394.18 BOSS-GYRO
664427.48 BOSS-GYRO
664460.93 BOSS-GYRO
664493.77 BOSS-GYRO
664526.33 BOSS-GYRO
664559.52 BOSS-GYRO
664593.83 BOSS-GYRO
664628.96 BOSS-GYRO
664665.76 BOSS-GYRO
664705.46 BOSS-GYRO
664745.62 BOSS-GYRO
664784.18 BOSS-GYRO
664822.57 BOSS-GYRO
664840.79 BOSS-GYRO
664856.97 BOSS-GYRO
664871.50 BOSS-GYRO
664885.33 BOSS-GYRO
664912.54 BOSS-GYRO
664938.13 BOSS-GYRO
664961.53 BOSS-GYRO
664982.09 BOSS-GYRO
664999.63 BOSS-GYRO
665015.12 BOSS-GYRO
665029.31 BOSS-GYRO
665042.32 BOSS-GYRO
665053.71 BOSS-GYRO
665063.65 BOSS-GYRO
665072.31 BOSS-GYRO
665079.43 BOSS-GYRO
665085.13 BOSS-GYRO
665089.53 BOSS-GYRO
665092.37 BOSS-GYRO
665094.31 BOSS-GYRO
665095.62 BOSS-GYRO
665096.18 BOSS-GYRO
665096.17 BOSS-GYRO
665095.63 BOSS-GYRO
•
Halliburton Company
Survey Report
Companyc BP Amoco Date: 6/6/2006 Tune: 08:33:35 Page: 3
Fieldd Prudhoe Bay Co-ordinate(NE) Reference: Well: C-16, True North.
Site: PB C Pad Vertical (TVD) Reference: C-16B 61.8
Well: C-16 Section (VS) Reference: Well (O.OON,O.OOE,205.OOAzi)
Wellpath: C-166 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys TVD N/S E/W MapN MapE Too[
ft deg deg' ft ft ft ft ft ft"
7802. 57 0.63 278. 90 7502. 58 7440.81 903. 41 984.76 5962022.64 665094.72 BOSS-GYRO
7902. 57 0.20 249. 10 7602. 58 7540.81 903. 44 984.05 5962022.65 665094.02 BOSS-GYRO
8002. 57 0.25 268. 70 7702. 58 7640.81 903. 37 983.67 5962022.57 665093.64 BOSS-GYRO
8102. 57 0.08 318. 61 7802. 58 7740.81 903. 42 983.41 5962022.62 665093.37 BOSS-GYRO
8202. 57 0.77 339. 80 7902. 58 7840.81 904. 10 983.13 5962023.29 665093.08 BOSS-GYRO
8302. 57 1.35 322. 21 8002. 56 7940.79 905. 66 982.17 5962024.83 665092.09 BOSS-GYRO
8402. 57 1.77 322. 80 8102. 52 8040.75 907. 82 980.52 5962026.96 665090.39 BOSS-GYRO
8502. 57 1.88 316. 71 8202. 47 8140.70 910. 25 978.46 5962029.34 665088.28 BOSS-GYRO
8602. 57 1.80 323. 00 8302. 42 8240.65 912. 69 976.39 5962031.74 665086.15 BOSS-GYRO
8702. 57 1.57 334. 40 8402. 38 8340.61 915. 18 974.85 5962034.19 665084.56 BOSS-GYRO
8802. 57 1.53 340. 61 8502. 34 8440.57 917. 68 973.82 5962036.67 665083.47 BOSS-GYRO
8902. 57 1.10 329. 11 8602. 31 8540.54 919. 76 972.88 5962038.73 665082.49 BOSS-GYRO
9002. 57 1.08 315. 90 8702. 29 8640.52 921. 26 971.73 5962040.20 665081.31 BOSS-GYRO
9040. 00 1.10 309. 72 8739. 72 8677.95 921. 74 971.21 5962040.67 665080.78 MWD+IFR+MS
9054. 00 3.16 278. 92 8753. 71 8691.94 921. 89 970.73 5962040.81 665080.29 MWD+IFR+MS
9083. 00 6.52 222. 41 8782. 61 8720.84 920. 80 968.83 5962039.67 665078.41 MWD+IFR+MS
9117. 00 14.68 215. 38 8816. 01 8754.24 915. 85 965.02 5962034.65 665074.72 MWD+IFR+MS
9147. 60 22.32 220. 03 8845. 01 8783.24 908. 23 959.03 5962026.90 665068.90 MWD+IFR+MS
9191. 93 33.25 225. 73 8884. 17 8822.40 893. 25 944.87 5962011.61 665055.07 MWD+IFR+MS
9223. 30 41.91 224. 91 8909. 01 8847.24 879. 80 931.29 5961997.87 665041.78 MWD+IFR+MS
9254. 26 49.69 221. 69 8930. 58 8868.81 863 .64 916.11 5961981.38 665026.97 MWD+IFR+MS
9285. 41 57.59 216. 37 8949. 04 8887.27 844 .14 900.38 5961961.55 665011.67 MWD+IFR+MS
9312. 81 65.23 213. 57 8962. 14 8900.37 824 .43 886.62 5961941.54 664998.34 MWD+IFR+MS
9347 .51 70.40 211. 11 8975. 24 8913.47 797 .29 869.45 5961914.03 664981.77 MWD+IFR+MS
9378 .68 78.16 208. 12 8983. 69 8921.92 771 .22 854.65 5961887.65 664967.54 MWD+IFR+MS
9406 .46 83.44 204. 88 8988. 13 8926.36 746 .69 842.43 5961862.86 664955.86 MWD+IFR+MS
9425 .00 87.55 202 .04 8989 .58 8927.81 729 .74 835.07 5961845.75 664948.88 MWD
9453 .46 80.77 201 .50 8992 .48 8930.71 703 .46 824.58 5961819.26 664938.96 MWD
9481 .93 79.01 199 .00 8997 .47 8935.70 677 .17 814.88 5961792.76 664929.83 MWD
9510 .63 81.28 198 .25 9002 .39 8940.62 650 .38 805.85 5961765.78 664921.39 MWD
9540 .10 83.50 193 .30 9006 .29 8944.52 622 .28 797.91 5961737.51 664914.07 MWD
9571 .34 84.46 189 .26 9009 .57 8947.80 591 .81 791.84 5961706.93 664908.67 MWD
9597 .62 85.25 185 .39 9011 .93 8950.16 565 .86 788.50 5961680.91 664905.90 MWD
9635 .49 85.43 180 .12 9015 .01 8953.24 528 .17 786.69 5961643.19 664904.91 MWD
9664 .61 84.99 179 .59 9017 .44 8955.67 499 .15 786.76 5961614.18 664905.62 MWD
9696 .91 84.81 172 .21 9020 .31 8958.54 467 .09 789.06 5961582.18 664908.61 MWD
9728 .15 87.27 172 .03 9022 .47 8960.70 436 .22 793.33 5961551.41 664913.56 MWD
9764 .74 87.19 176 .07 9024 .24 8962.47 399 .87 797.12 5961515.16 664918.14 MWD
9795 .87 90.35 178 .18 9024 .91 8963.14 368 .80 798.68 5961484.13 664920.38 MWD
9829 .18 91.93 181 .87 9024 .24 8962.47 335 .50 798.67 5961450.84 664921.09 MWD
9858 .99 91.81 186 .49 9023 .27 8961.50 305 .79 796.50 5961421.10 664919.57 MWD
9893 .80 94.63 189 .31 9021 .32 8959.55 271 .38 791.72 5961386.58 664915.55 MWD
9922 .84 92.60 193 .36 9019 .48 8957.71 242 .97 786.03 5961358.06 664910.48 MWD
9951 .87 92.07 194 .77 9018 .30 8956.53 214 .83 778.98 5961329.78 664904.04 MWD
9990 .51 92.60 200 .94 9016 .73 8954.96 178.10 767.15 5961292.80 664893.02 MWD
10024 .90 91.37 204 .28 9015 .53 8953.76 146 .38 753.93 5961260.80 664880.50 MWD
10066 .89 90.75 210 .45 9014 .76 8952.99 109 .11 734.64 5961223.12 664862.03 MWD
10116 .93 91.01 216 .44 9013 .99 8952.22 67 .38 707.08 5961180.80 664835.39 MWD
10143 .76 92.42 218 .21 9013 .18 8951.41 46 .06 690.82 5961159.13 664819.60 MWD
10171 .40 90.57 219 .97 9012 .46 8950.69 24 .61 673.40 5961137.31 664802.66 MWD
10201 .65 92.16 224.37 9011 .74 8949.97 2 .20 653.11 5961114.47 664782.85 MWD
10238 .96 90.48 219 9010 .88 8949.11 -23.81 626.38 5961087.88 664756.70 MWD
10269 .82 91.63. 228.6Q 9010.31 8948.54 -44.49 603.49 5961066.70 664734.27 MWD
•
Halliburton Company
Survey Report
C
Company:. BP Amoco Date: 6/6/2006 Time: 08:33:35 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: C-16, True North
`Site: PB C Pad Vertical (TVD) Reference: C-166 61.8
Well: C-1 6 Section (VS) Reference: : Well{O.OON ,O'.OO E,205.OOAzi)
Wellpatbs C-1 6B Survey Calculation Metbod: Minimum Curvature Db: Orate
Survey
MD Incl Azim TVD Sys TVD N/S E/W MapN MapE Tool
ft- deg deg ft ft ft ft ft ft
10302. 02 92.44 231.43 9009.17 8947. 40 -65. 17 578.83 5961045. 49 664710. 08 MWD
10326. 57 92.69 227.90 9008.07 8946. 30 -81. 04 560.14 5961029. 22 664691. 74 MWD
10361. 45 89.25 222.43 9007.48 8945. 71 -105. 62 535.42 5961004. 11 664667. 56 MWD
10398. 34 87.84 220.50 9008.42 8946. 65 -133. 25 511.01 5960975. 95 664643. 76 MWD
10440. 20 82.82 217.15 9011.83 8950. 06 -165 .74 484.86 5960942. 91 664618. 33 MWD
10473. 38 83.70 213.27 9015.72 8953. 95 -192 .65 465.86 5960915. 58 664599. 93 MWD
10504. 07 85.46 215.03 9018.62 8956. 85 -217. 93 448.71 5960889. 93 664583. 33 MWD
10535. 99 88.55 209.75 9020.29 8958. 52 -244. 84 431.65 5960862. 66 664566. 86 MWD
10564. 04 87.40 209.57 9021.28 8959. 51 -269. 20 417.78 5960838. 01 664553. 53 MWD
10602. 33 88.11 200.76 9022.78 8961. 01 -303 .79 401.52 5960803. 07 664538. 03 MWD
10634. 58 88.37 197.24 9023.77 8962. 00 -334 .27 391.03 5960772. 38 664528. 21 MWD
10665. 24 88.99 192.65 9024.48 8962. 71 -363 .88 383.13 5960742. 61 664520. 96 MWD
10705. 79 91.37 191.42 9024.35 8962. 58 -403 .53 374.67 5960702. 78 664513. 37 MWD
10733. 37 91.10 194.59 9023.76 8961. 99 -430 .39 368.47 5960675. 79 664507. 75 MWD
10771. 68 90.57 198.29 9023.20 8961. 43 -467 .13 357.63 5960638. 83 664497. 72 MWD
10804. 69 94.98 202.35 9021.60 8959. 83 -498 .03 346.19 5960607. 68 664486. 96 MWD
10852. 48 99.65 204.64 9015.52 8953. 75 -541 .49 327.30 5960563. 83 664469. 03 MWD
10886. 56 98.68 205.34 9010.09 8948. 32 -571 .99 313.09 5960533. 03 664455. 48 MWD
10923. 92 93.57 204.11 9006.10 8944. 33 -605 .72 297.56 5960498. 97 664440. 69 MWD
10968. 06 90.13 204,28 9004.68 8942. 91 -645 .95 279.48 5960458. 35 664423. 50 MWD
11008. 74 88.72 210.45 9005.09 8943 .32 -682 .06 260.79 5960421. 85 664405. 61 MWD
11044. 27 89.34 211.51 9005.69 8943 .92 -712 .52 242.51 5960391. 00 664387. 99 MWD
11083. 92 88.11 210.98 9006.57 8944 .80 -746 .40 221.94 5960356. 67 664368. 18 MWD
11114. 38 87.14 215.21 9007.83 8946 .06 -771 .90 205.33 5960330. 83 664352. 13 MWD
11159. 23 87.19 224.06 9010.06 8948 .29 -806 .36 176.79 5960295. 75 664324. 34 MWD
11191. 69 90.12 223.00 9010.82 8949 .05 -829 .88 154.44 5960271. 75 664302. 51 MWD
11224. 49 90.44 227.40 9010.66 8948 .89 -852 .99 131.17 5960248. 14 664279. 76 MWD
11259. 32 89.12 235.31 9010.79 8949 .02 -874 .72 103.99 5960225. 82 664253 .06 MWD
11286. 93 87.32 239.22 9011.65 8949 .88 -889 .64 80.78 5960210. 40 664230 .19 MWD
11325. 38 91.14 241.64 9012.17 8950 .40 -908 .61 47.35 5960190. 70 664197 .18 MWD
11355. 76 91.05 247.62 9011.59 8949 .82 -921 .62 19.92 5960177. 10 664170 .04 MWD
11385. 63 90.26 249.20 9011.24 8949 .47 -932 .61 -7.85 5960165 .51 664142 .52 MWD
11419. 25 87.98 252.54 9011.76 8949 .99 -943 .62 -39.61 5960153 .80 664111 .01 MWD
11465. 00 87.98 252.54 9013.37 8951 .60 -957 .34 -83.22 5960139 .14 664067 .71 MWD
TREE _ . 6" FMC
WELLHEAD = FMC
ACTUATOR = OTIS
KB. E1EV = 63.70'
BF. ELEV = 37.01'
KOP = 2900'
Max Angle = 99 @ 10852'
Datum MD = 9167'
Datum TV D = 8800' SS
TOP OF 7" SCAB LNR ~ 2672'
13-318" CSG, 72#, L-80, ID = 12.347° 2691'
Minimum ID = 2.37" @ 9643'
TIW LSL Sub,3-3/16X2-7/8" XO
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I~ 8073'
9-5/8" CSG, 47#, L-80, ID = 8.681" I--I 8578'
4-112" LNR, 12.6#, L-80..0152 bpf, ID = 3.958" 8904'
TOP OF WHIPSTOCK 9040'
EZSV BRIDGE PLUG 9054'
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 9475'
PERFORATION SUMMARY
REF LOG: SWS MCNUGR OF 05!21/2006
ANGLE AT TOP PERF: 85 @ 9600'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2.00" 6 9600 - 9660 OPEN 05/21/06
2.00" 6 9880 - 10020 OPEN 05/21/06
2.00" 6 10470 - 10540 OPEN 05/21!06
2.00" 6 10580 - 10710 OPEN 05/21/06
2.00" 6 10880 - 11420 OPEN 05121 /06
C-16B S
from DRLG DRAFT
2197'
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I~ 10350'
NOTES:
~ 4-1/2" HES X NIP, ID = 3.813" ~
2673' I-1 9-5/8" X 7" BKR ZXP LNR TOP PKR
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3887 3847 25 KBG-2 SO BK 20 05/27/06
3 6393 6097 9 KBG-2 DMY BK 0 06/07/03
2 7925 7625 0 KBG-2 DMY BK 0 06107/03
1 8761 8461 2 KBG-2 DMY BK 0 06/07/03
8827' ~-1 4-1/2" HES X NIP, ID = 3.813" I
8848' 7" X 4-1/2" BKR S-3 PERM PKR, ID = 3.875"
8871' 4-1 /2" HES X NIP, ID = 3.813"
8892' 4-1/2" HES XN NIP, ID = 3.725" (milled to 3 8")
8905' 4-1/2" WLEG, ID = 3.958"
8902' 7" X 5" BKR ZXP LNR TOP PKR
MILLOUT WINDOW 9040 ' - 9062'
/ 9365' KB Liner Top Packer
9372' Top of 3-1/2" Liner
9391' 3-112" XN NIP. ID = 2.75"
9641' 3-3116 x 2-7/8 LSL XO
3-3116" X 2-7/8" Cemented/Perf'd I 11456'
9425' Mechanical Whipstock
9440' CIBP
10265' PBTD
DATE REV BY COMMENTS DATE REV BY COMMENTS
06/12/80 ORIGINAL COMPLETION 05/27/06 DTR/PJC GLV GO
06/07(03 DAV/KK RIG SIDETRACK (C-16A)
06/19/03 JCM/TLH GLV C%O
09!15/03 CMO/TLP DATUM MD 8 REF LOG
05/10/04 KSB/KAK GLV GO
05/22/06 RRW CTD HORIZONTAL SIDETRACK
PRUDHOE BAY UNfT
WELL: G166
PERMIT No: 82030840
API No: 50-029-20438-02
SEC 19, T11 N, R14E, 115.96' FNL & 1218.02' FEL
BP Exploration (Alaska)
.~
~~ '~~~ d ! ~ ~ ~ a1 ~ ~ ~ ~ .~; ~ ym ~~ FRANK H. MURKOWSKI, GOVERNOR
s
r
OIL tusil V[Ca-7 ~ 333 W. 7T" AVENUE, SUITE 100
COI~TSERQA~'IO1K COD'II~'II5SIOIQ ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
Sean McLaughlin FAx (907) 276-7542
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-16B
BP Exploration (Alaska) Inc.
Permit No: 206-051
Surface Location: 116' FNL, 1218' FEL, SEC. 19, T11N, R14E, UM
Bottomhole Location: 4087' FSL, 1408' FEL, SEC. 19, Tl 1N, R14E, UM
Dear Mr. McLaughlin:
Enclosed is the approved application for permit to drill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field inspector at (907) 6~-3607 (pager).
N
DATED this~day of April, 2006
cc: Department of Fish 8v Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALA! OIL AND GAS CONSERVATION COMI'~ION
PERMIT TO DRILL
20 AAC 25.005
W~~ `4~'G~1VED
1 a. Type of work
® Drill ^Redrill
^ Re-Entry 1 b. Current Well Class D Exploratory D Development Gas
^ ervice ^ Multiple Zone
D Stratigraphic Test ~hevelopment Oil ^ Single Zone 1 c. Specify if well is prop ed or:
^ Coalbed Methane ~'f3`a5'~{~ tes
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ^ Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
PBU C-16B ~
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 11625 TVD 8952 12. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section):
Surface:
116' FNL
1218' FEL
SEC
19
T11N
R14E
UM 7. Property Designation:
ADL 028305 Pool
,
,
,
.
,
,
Top of Productive Horizon:
758' FSL, 289' FEL, SEC. 18, T11N, R14E, UM 8. Land Use Permit: 13. Approximate Sp Date:
Jun 1 006
Total Depth:
4087 FSL, 1408' FEL, SEC. 19, T11 N. R14E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
.22100'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-664130 y-5961098 Zone-ASP4 10. KB Elevation
(Height above GL): 61.77' feet 15. Distance to Nearest Well Within Pool:
850'
16. Deviated Wells: Kickoff Depth: 9420 feet
Maximum Hole Angle: 100.03 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3100 Surface: 2220
18. Casin Program: S ecifications Top - Settin De th -Bottom Quantity of Cement, c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
4-1 /8" 33/16° x s-~/s° 6.2# / 6.16# L-80 TCI I/STL 2245' 9380' 8926' 11625' 8952' 116 sx Class 'G'
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations)
Total Depth MD (ft):
10350 Total Depth TVD (ft):
8973 Plugs (measured):
None Effective Depth MD (ft):
10266 Effective Depth TVD (ft)
8978 Junk (measured):
None
Casing Length :Size Cement Volume MD TVD
Conductor /Structural 110' 20" x 30" 12.9 cu ds Concrete 110' 110'
Surface 2691' 13-3/8" 3720 cu ft Permafrost II 2691' 2691'
Intermediate 8578' 9-5/8" 1160 cu ft Class 'G', 130 cu ft Arcticset 8578' 8278'
Production 5401' 7" Scab Liner: 870 cu ft Class 'G' 2672' - 8073' 2672' - 7773'
Liner 967' 7" 401 cu ft Class 'G' 8073' - 9040' 7773' - 8740'
Liner 1456' 4-1 /2" 225 cu ft Class 'G' 8894' - 10350' 8594' - 8973'
Perforation Depth MD (ft): 9725' - 10200' Perforation Depth TVD (ft): 8984' - 8981'
20. Attachments ®Filing Fee, $100 ®BOP Sketch ^ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
p Property Plat D Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct.
Printed Name Sean McLaughlin Title CT Drilling Engineer
Si nature /,,/~ Phone 564-4387 Date 3 Contact Sean McLaughlin, 564-4387
Prepared By Name/Number:
OG
Commission Use Only
Permit To Drill
Number: Z ~- C~,S API Number: Permit pro
50- 029-20438-02-00 Date: -- "- ,,,, ~
J See cover letter for
other requirements
Conditions of Approval:
If box is checked, well may not be used to explore for, test, or produce coalbed methane, as ydrates, or gas contained shales
Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes~No
L L HZS Measures:~Yes ^ it tional Survey Req'd:~Yes ^ No
Other:Tf~S` ~~~~ (D 3St7O r0~,
A PROVED BY THE COMMISSIO
Date ~~~~ v , ,COMMISSIONER
-~~~f~
Form 10-401 Revised 12/2005 ~ ; ~ ~ ~ -`~ ~ / ~ Submit In Duplicate
. ~ ~,/
• BP
Prudhoe Bay C-16B CTD Sidetrack
CTD Sidetrack Summary
Pre-Rig Work:
1. O AC-LDS; AC-PPPOT-IC, T
2. S Caliper liner and tubing
3. S Set DGLV's
4. O MIT-IA and MIT-OA
5. C Run dummy whipstock drift
6. C Run MGR/CCL tie in log
7. C Set CIBP at 9435' ~
8. O Bleed gas lift and production flowlines down to zero and blind flange
9. O Remove wellhouse, level pad
The pre CTD work is slated to begin on May 1, 2006.
Rig Work:
1. MIRU and test BOPE to 250 psi low and SOOrp'si high.
2. Set Wfd LSX whipstock at 9420' ~ ;; -~'
3. Mill XN nipple, 3.8" window at 9420', and 10' of rathole. Swap the well to Flo-Pro. ~
4. Drill Lateral: 4.125" OH, 2205' horizontal (12 deg/100 planned), with resistivity
5. MAD pass with resistivity tools in memory mode
6. Run 3-3/16" 2-7/8" solid liner leaving TOL at 9 0' ~
7. Pump primary cement leaving TOC at 9380', 2 bl of 15.8 ppg liner cmt planned
8. Cleanout liner and MCNL/GR/CCL log -
9. Test liner lap to 2000 psi.
10. Perforate liner per asset instructions 0600')
11. Freeze protect well, RDMO
Post-Rig Work:
1. Move wellhouse, Install production flowline
2. Run GLVs
3. Flowback well to separator
Mud Program: j,i
• Well kill: 8.6 ppg brine
• Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 4-1/8"
Casing Program: fully cemented liner
• 3-3/16", L-80 6.2# TCII 9380' and - 10200' and
• 2-7/8", L-80 6 STL 10200'md - 11625'md
• A minimum o 2~. bbls 15.8 ppg cement will be used for liner cementing.
• TOC planned at 9380'
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. ~
• The annular preventer will be tested to 250 psi and 2500 psi.
Directional
• See attached directional plan. Max. planned hole angle is 100 deg.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 22,100 ft.
• Distance to nearest well within pool - 850 ft.
Logging
• MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section.
• A cased hole CNL/GR/CCL log will be run.
Hazards
• The maximum recorded H2S level on C pad is~1Q.~pm
• Lost circulation risk is low, no fault crossings--~xpected.
Reservoir Pressure
• The max res. press. is estimated to be 3100 psi at 8800'ss (6.8_ppg EMW).
• Max. surface pressure with gas (0.10 psi/ft) to surface is~0~si.
TREE _ 6" FMC
WELLHEAD = FMC
ACTUATOR = OTIS
KB. ELEV = 63.70'
BF. ELEV.- _ 37.01,
KOP = 2900'
Max Angle = 97 @ 9500'
Datum MD = 9167
Datum TV D = 8800' SS
•
TOP OF 7" SCAB LNR 2672'
13-3l8" CSG, 72#, L-80, ID = 12.347" 2691'
Minimum ID = 3.725" @ 8892'
4-1/2" HES XN NIPPLE
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 8073'
9-5/8" CSG, 47#, L-80, ID = 8.681" I-I $578'
I4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 8904'
TOP OF WHIPSTOCK 9040'
EZSV BRIDGE PLUG 9054'
PERFORATION SUMMARY
REF LOG: MWD GR ON 05/26/03
ANGLE AT TOP PERF: 90 @ 9725'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 9725 - 9775 O 06/05/03
2-7/8" 4 9950 - 10200 O 06/05/03
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 9475'
C-16A '
2197' I~ 4-1/2" HES X NIP, ID = 3.813"
2673' ~~ 9-5/8" X 7" BKR ZXP LNR TOP PKR
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3887 3847 25 KBG-2 DMY BK 0 05/10!04
3 6393 6097 9 KBG-2 DMY BK 0 06/07/03
2 7925 7625 0 KBG-2 DMY BK 0 06/07/03
1 8761 8461 2 KBG-2 DMY BK 0 06/07/03
8827' l-~ 4-1/2" HES X NIP, ID = 3.813"
8848' 7" X 4-1/2" BKR S-3 PERM PKR ID = 3.875"
8871' 4-1 /2" HES X NIP, ID = 3.813"
8892' 4-1/2" HES XN NIP, ID = 3.725"
8905' 4-1l2" WLEG, ID = 3.958"
8902' 7" X 5" BKR ZXP LNR TOP PKR
\ MILLOUT WINDOW 9040' - 9062'
10265' I--I PBTD
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10350'
DATE REV BY COMMEMS DATE REV BY COMMENTS
06!12/80 ORIGINAL COMPLETION
06/07/03 DAV/KK RIG SIDETRACK (C-16A)
06/19/03 JCM/TLH GLV C/O
09/15/03 CMO/TLP DATUM MD & REF LOG
05/10!04 KSB/KAK GLV C/O
PRUDHOE BAY UNff
WELL: G16A
PERMIT No: 2030840
API No: 50-029-20438-01
SEC 19, T11N, R14E, 115.96' FNL & 1218.02' FEL
BP Exploration (Alaska)
TREE = 6" FMC
WELLHEAD= FMC
ACTUATOR = OTIS
KB. ELEV = 63.70'
BF. ELEV = 37.01'
KOP = 2900'
Max Angle = 97 rQ 9500'
Datum MD = 9167'
Datum ND = 8800' SS
TOP OF 7" SCAB LNR ~--~ 2672
13-3/8" CSG, 72#, L-80, ID = 12.347" ~~ 2691'
Minimum ID = 3.725" @ 8892'
4-1/2" HES XN NIPPLE
(milled to 3.8")
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276"
~ 9-5/8" CSG, 47#, L-80, ID = 8.681" ~
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 8904'
TOP OF WHIPSTOCK 9040
EZSV BRIDGE PLUG 9054'
7" LNR, 29#, L-80, .0371 bpf, O = 6.184" 9475
C-16B
Proposed CTD Sidetrack
PERFORATION SUMMARY
REF LOG: MWD GR ON 05/26/03
ANGLEATTOPPERF: 90 ~ 9725'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-7/8" 4 9725 - 9775 isolated proposed
2-7/8" 4 9950-10200 isolated proposed
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 10350'
NOTES:
~ 4-1/2" HES X NIP, ID = 3.813" ~
9-5/8" X 7" BKR ZXP LNR TOP PKR
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT DATE
4 3887 3847 25 KBG-2 DMY BK 0 05/10/04
3 6393 6097 9 KBG-2 DMY BK 0 06/07/03
2 7925 7625 0 KBG-2 DMY BK 0 06/07/03
1 8761 8461 2 KBG-2 DMY BK 0 06/07/03
8827 I~ 4-1/2" HES X NIP, ID = 3.813"
8848' 7" X 4-1/2" BKR S-3 PERM PKR, ID = 3.875"
8871 ~ 4-1 /2" HES X NIP, ~ = 3.813"
8892' 4-1/2" HES XN NIP, ID = 3.725" (milled to 3.8' )
8905 4-1/2" WLEG, ~= 3.958"
8902 7" X 5" BKR ZXP LNR TOP PKR
MILLOUT WINDOW 9040 ' - 9062'
~i 9380' L~~ner-cp Packer i
9390' sp ~ 2° ,_iner TOC
9400' 3-" 2" XN NIP, ID = 2.75"
10200' 3-3116 x 2-7'8 X-over
( 2-718" pre-drilled
~chanical ~~lfiipstoc
CIB~P
F931 V I
DATE REV BY COMMENTS DATE REV BY COMMENTS
06112/80 ORIGINAL COMPLETION
06107/03 DAVIKK RIG SIDETRACK (C-16A)
06/19/03 JCM/TLH GLV C/O
09/15/03 CMO/TLP DATUM MD & REF LOG
05/10/04 KSB/KAK GLV C/O
11625' ~
PRUDHOE BAY UNfr
WELL: G16A
PERMfT No: 2030840
API No: 50-029-20438-01
SEC 19, T11N, R14E, 115.96' FNL 8 1218.02' FEL
BP Exploration (Alaska)
b • BP Alaska
P Baker Hughes INTEQ Planning Report
s~R ~
wuei~as
INTEQ
Company: BP Amocp Date: 3/9/2006 Time: 19:26:06 Page: 1
Field: Prudhoe Bay Co-ardinate(NE) Reterence: Well: C-16, True North
Site: PB C Pad Vertical (T'VD) Reference: C- 16A: 61.8
Well: C-16 Seetion(VS)Refcregce: Well (O.OON,O.OOE,182.60Azi)
Wellpath: Plan 6, C-16B Survey Calculation Method: Minimum Curvature Db: Qrade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Ceo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005
Site: PB C Pad
TR-11-14
UNITED STATES :North Slope
Site Position: Northing: 5957218. 72 ft Latitude: 70 17 22.367 N
From: Map Easting: 662550. 03 ft Longitude: 148 41 2.797 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.24 deg
Well: C-16 Slot Name: 16
C-16
Well Position: +N/-S 3844.48 ft Northing: 5961098. 00 ft Latitude: 70 18 0.176 N
+E/-W 1663.59 ft Easting : 664130. 00 ft Longitude: 148 40 14.299 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 6, C-168 Drilled From: C-16AP61
Tie-on Depth: 9406.46 ft
Current Daturo: C-16A: Height 61. 77 ft Above System Datum: Mean Sea Level
Magnetic Data: 3/9/2006 Declination: 24.60 deg
Field Strength: 57605 nT Mag Dip Angle: 80.89 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.77 0.00 0.00 182.60
Plan: Pfan #6 Date Composed: 3/9/2006
Copy Lamar's PIan6 Version: 6
Principal: Yes Tied-to: From: Definitive Path
Targets
:Map Map 4--- Latitude: ----> <... ~ngifude -->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min See
Dip. Dir. ft ft ft ft ft
C-16B Polygon 61.77 508.78 841.37 5961625.00 664960.00 70 18 5.179 N 148 39 49.768 W
-Polygon 1 61.77 508.78 841.37 5961625.00 664960.00 70 16 5.179 N 148 39 49.768 W
-Polygon 2 61.77 133.08 868.18 5961250.00 664995.00 70 18 1.484 N 148 39 48.988 W
-Polygon 3 61.77 -181.51 616.23 5960930.00 664750.00 70 17 58.390 N 148 39 56.334 W
-Polygon 4 61.77 -675.10 315.35 5960430.00 664460.00 70 17 53.536 N 148 40 5.106 W
-Polygon 5 61.77 -1309.39 -183.65 5959785.00 663975.00 70 17 47.298 N 148 40 19.652 W
-Polygon 6 61.77 -1108.42 -454.35 5959980.00 663700.00 70 17 49.274 N 148 40 27.542 W
-Polygon 7 61.77 -408.94 266.15 5960695.00 664405.00 70 17 56.154 N 148 40 6.540 W
-Polygon 8 61.77 132.67 658.10 5961245.00 664785.00 70 18 1.480 N 148 39 55.113 W
-Polygon 9 61.77 517.06 691.51 5961630.00 664810.00 70 18 5.261 N 148 39 54.138 W
C-16B Faultl 61.77 470.56 530.44 5961580.00 664650.00 70 18 4.803 N 148 39 58.834 W
-Polygon 1 61.77 470.56 530.44 5961580.00 664650.00 70 18 4.803 N 148 39 58.834 W
-Polygon 2 61.77 455.32 770.18 5961570.00 664890.00 70 18 4.653 N 148 39 51.844 W
-Polygon 3 61.77 357.09 1603.29 5961490.00 665725.00 70 18 3.686 N 148 39 27.556 W
-Polygon 4 61.77 455.32 770.18 5961570.00 664890.00 70 18 4.653 N 148 39 51.844 W
C-166 Fault3 61.77 -271.94 634.26 5960840.00 664770.00 70 17 57.501 N 148 39 55.809 W
-Polygon 1 61.77 -271.94 634.26 5960840.00 664770.00 70 17 57.501 N 148 39 55.809 W
-Polygon 2 61.77 -410.82 581.21 5960700.00 664720.00 70 17 56.135 N 148 39 57.356 W
C-16B Fault4 61.77 -796.28 367.72 5960310.00 664515.00 70 17 52.344 N 148 40 3.580 W
-Polygon 1 61.77 -796.28 367.72 5960310.00 664515.00 70 17 52.344 N 148 40 3.580 W
-Polygon 2 61.77 -1301.00 576.76 5959810.00 664735.00 70 17 47.380 N 148 39 57.487 W
C-166 Faultl 61.77 165.17 543.78 5961275.00 664670.00 70 18 1.800 N 148 39 58.446 W
-Polygon 1 61.77 165.17 543.78 5961275.00 664670.00 70 18 1.800 N 148 39 58.446 W
-Polygon 2 61.77 -317.53 203.13 5960785.00 664340.00 70 17 57.053 N 148 40 8.377 W
C-16B Faults 61.77 -1212.80 -26.50 5959885.00 664130.00 70 17 48.248 N 148 40 15.071 W
-Polygon 1 61.77 -1212.80 -26.50 5959885.00 664130.00 70 17 48.248 N 148 40 15.071 W
-Polygon 2 61.77 -1278.36 227.15 5959825.00 664385.00 70 17 47.603 N 148 40 7.678 W
C-166 Target 3 9005.77 -429.89 400.74 5960677.00 664540.00 70 17 55.948 N 148 40 2.617 W
BP Alaska
by
Baker Hughes INTEQ Planning Report
s~R ~
wut~s
INTEQ
Company? BP AmOCO `.Date: 3/9/2006 Time: 19:26:06 Page: 2
Field:. Prudhoe Bay Go-ordinate(NE) Reference: Well: C-16, TNe North
Site:: ` PB C Pad Vertical (TVD) Reference: C -16A: 61.8
Welf; G-16 Section (VS) Refereuce: Well (O.OON,O.OOE,182.60Azi)
Wellpath: Plan 6, C-168 Survey Cakulation Method: Minimum Curvature Db: Oracle
Targets
Map Map <-' Latitude ---> <- Longitude -_>
-Name Description: -TVD +NI-S +E/-W Nort6ins Eastieig Deg Min Sec Deg Min Sec
Dip. Dia ft ft ft ft ft
C-16B Target 4 9013.77 -1064.33 -183.30 5960030.00 663970.00 70 17 49.708 N 148 40 1 9.642 W
C-16B Targetl 9021.77 420.75 841.45 5961537.00 664962.00 70 18 4.313 N 148 39 49.766 W
C-166 Target 2 9021.77 -325.37 470.04 5960783.00 664607.00 70 17 56.976 N 148 40 0.596 W
Annotation
MD TVD ,
ft ft
9406.46 8988.13 TIP
9420.00 8989.32 KOP
9440.00 8990.29 End of 9 deg/100 DLS
9470.00 8990.75 4
9560.00 9000.27 5
9758.09 9022.07 End of 15 deg /100 DLs
9833.09 9022.07 7
10358.09 9022.07 8
10583.09 9022.07 9
10672.09 9014.30 10
10761.09 9006.54 11
10836.09 9006.98 12
11236.09 9010.97 13
11625.00 9013.59 TD
Plan Section Information
MD Inci Azim TVD +N!-S +E/-W -DLS Build Tnm TFO Tarftet
ft 'deg _deg ft ft ft deg/100ft deg/100ft dng/100ft deg
9406.46 83.44 204.88 8988.13 746.69 842.43 0.00 0.00 0.00 0.00
9420.00 86.44 202.80 8989.32 734.35 836.98 26.93 22.16 -15.36 325.27
9440.00 88.00 203.70 8990.29 716.00 829.09 9.00 7.80 4.50 30.00
9470.00 90.25 207.60 8990.75 688.97 816.11 15.00 7.51 12.99 60.00
9560.00 77.58 202.91 9000.27 608.23 777.98 15.00 -14.08 -5.21 200.00
9758.09 90.00 175.70 9022.07 416.04 747.07 15.00 6.27 -13.74 292.70
9833.09 90.00 166.70 9022.07 342.00 758.54 12.00 0.00 -12.00 270.00
10358.09 90.00 229.70 9022.07 -132.00 602.74 12.00 0.00 12.00 90.00
10583.09 90.00 202.70 9022.07 -311.90 471.09 12.00 0.00 -12.00 270.00
10672.09 100.03 206.39 9014.30 -392.44 434.34 12.00 11.27 4.15 20.00
10761.09 89.98 210.02 9006.54 -470.46 392.48 12.00 -11.29 4.08 160.00
10836.09 89.35 201.04 9006.98 -538.06 360.19 12.00 -0.83 -11.97 266.00
11236.09 89.57 249.04 9010.97 -812.48 85.35 12.00 0.05 12.00 90.00
11625.00 89.70 202.37 9013.59 - 1076.61 -185.39 12.00 0.03 -12.00 270.00
Survey
MD Incl..` Aziro Sys.TVD N/S E/V1' MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft_ ft ft deg/100ft ft deg
9406.46 83.44 204.88 8926.36 746.69 842.43 5961862.86 664955.86 0.00 -784.14 0.00 MWD
9420.00 86.44 202.80 8927.55 734.35 836.98 5961850.41 664950.68 26.93 -771.57 325.27 MWD
9440.00 88.00 203.70 8928.52 716.00 829.09 5961831.89 664943.20 9.00 -752.87 30.00 MWD
9450.00 88.75 205.00 8928.80 706.89 824.97 5961822.70 664939.28 15.00 -743.59 60.00 MWD
9470.00 90.25 207.60 8928.98 688.97 816.11 5961804.58 664930.81 15.00 -725.28 59.96 MWD
9475.00 89.55 207.34 8928.99 684.53 813.81 5961800.10 664928.60 15.00 -720.74 200.00 MWD
9500.00 86.02 206.06 8929.95 662.22 802.58 5961777.54 664917.87 15.00 -697.94 200.00 MWD
9525.00 82.50 204.76 8932.45 639.75 791.91 5961754.85 664907.69 15.00 -675.02 200.05 MWD
9550.00 78.98 203.44 8936.47 617.23 781.84 5961732.12 664898.11 15.00 -652.06 200.18 MWD
9560.00 77.58 202.91 8938.50 608.23 777.98 5961723.04 664894.46 15.00 -642.90 200.39 MWD
9575.00 78.46 200.79 8941.62 594.61 772.52 5961709.30 664889.30 15.00 -629.05 292.70 MWD
9587.28 79.18 199.06 8944.00 583.28 768.42 5961697.89 664885.44 15.00 -617.54 293.14 C-166 T
9600.00 79.95 197.29 8946.30 571.40 764.52 5961685.93 664881.80 15.00 -605.50 293.47 MWD
9625.00 81.48 193.82 8950.34 547.64 757.91 5961662.02 664875.71 15.00 -581.46 293.80 MWD
9650.00 83.04 190.38 8953.71 523.42 752.72 5961637.70 664871.05 15.00 -557.03 294.36 MWD
b ~ BP Alaska
p
Baker Hughes INTEQ Planning Report
s~R ~
eu~~s
INTEQ
Company: BP Amoco- Date: 3!9/2006 - Time: 19:26:06 Page: 3
Field: 'Prudtwe Bay Go-ordinataNE) Reference: Well: C-16, True North
Site: PB C Pad Vertieai (TVD) Reference: G16A: 61:8
We1L• C-1 6 Section(VS)Referen¢e: Well(O.OON, O.OOE,182.60Azi)
Welipath: Plan 6, C-'168 Survey Gaku{ationMethod: Minimum Cu rvature Db: Oracle
Survey
MD Inel Azim Sys TVD N/S E/W MapN ` MapE DIS VS TFO Tool
ft deg deg ft ft ft tt ft deg/100ft ft deg
9675.00 84.63 186.96 8956.39 498.85 748.97 5961613.06 664867.84 15.00 -532.32 294.82 MWD
9700.00 86.23 183.56 8958.38 474.04 746.69 5961588.21 664866.10 15.00 -507.43 295.19 MWD
9725.00 87.85 180.17 8959.68 449.09 745.88 5961563.25 664865.84 15.00 -482.47 295.46 MWD
9750.00 89.47 176.79 8960.26 424.11 746.54 5961538.29 664867.05 15.00 -457.54 295.63 MWD
9758.09 90.00 175.70 8960.30 416.04 747.07 5961530.23 664867.75 15.00 -449.50 295.71 MWD
9775.00 90.00 173.67 8960.30 399.20 748.64 5961513.43 664869.69 12.00 -432.75 270.00 MWD
9800.00 90.00 170.67 8960.30 374,44 752.05 5961488.75 664873.63 12.00 -408.17 270.00 MWD
9825.00 90.00 167.67 8960.30 349.89 756.74 5961464.31 664878.87 12.00 -383.86 270.00 MWD
9833.09 90.00 166.70 8960.30 342.00 758.54 5961456.46 664880.83 12.00 -376.06 270.00 MWD
9850.00 90.00 168.72 8960.30 325.48 762.14 5961440.03 664884.79 12.00 -359.72 90.00 MWD
9875.00 90.00 171.72 8960.30 300.85 766.38 5961415.49 664889.57 12.00 -335.30 90.00 MWD
9900.00 90.00 174.72 8960.30 276.02 769.33 5961390.74 664893.06 12.00 -310.64 90.00 MWD
9925.00 90.00 177.72 8960.30 251.08 770.98 5961365.84 664895.25 12.00 -285.79 90.00 MWD
9950.00 90.00 180.72 8960.30 226.08 771.32 5961340.86 664896.14 12.00 -260.84 90.00 MWD
9975.00 90.00 183.72 8960.30 201.11 770.35 5961315.87 664895.71 12.00 -235.84 90.00 MWD
10000.00 90.00 186.72 8960.30 176.21 768.07 5961290.93 664893.98 12.00 -210.87 90.00 MWD
10025.00 90.00 189.72 8960.30 151.47 764.49 5961266.12 664890.95 12.00 -186.00 90.00 MWD
10050.00 90.00 192.72 8960.30 126.95 759.63 5961241.51 664886.62 12.00 -161.28 90.00 MWD
10075.00 90.00 195.72 8960.30 102.72 753.48 5961217.15 664881.01 12.00 -136.80 90.00 MWD
10100.00 90.00 198.72 8960.30 78.85 746.08 5961193.12 664874.13 12.00 -112.61 90.00 MWD
10125.00 90.00 201.72 8960.30 55.39 737.44 5961169.48 664866.00 12.00 -88.79 90.00 MWD
10150.00 90.00 204.72 8960.30 32.42 727.58 5961146.30 664856.65 12.00 -65.39 90.00 MWD
10175.00 90.00 207.72 8960.30 10.00 716.54 5961123.64 664846.10 12.00 -42.49 90.00 MWD
10200.00 90.00 210.72 8960.30 -11.82 704.33 5961101.57 664834.37 12.00 -20.14 90.00 MWD
10225.00 90.00 213.72 8960.30 -32.97 691.00 5961080.14 664821.51 12.00 1.59 90.00 MWD
10250.00 90.00 216.72 8960.30 -53.39 676.59 5961059.41 664807.54 12.00 22.64 90.00 MWD
10275.00 90.00 219.72 8960.30 -73.02 661.12 5961039.44 664792.51 12.00 42.96 90.00 MWD
10300.00 90.00 222.72 8960.30 -91.83 644.65 5961020.28 664776.45 12.00 62.49 90.00 MWD
10325.00 90.00 225.72 8960.30 -109.74 627.21 5961002.00 664759.41 12.00 81.17 90.00 MWD
10350.00 90.00 228.72 8960.30 -126.71 608.86 5960984.62 664741.44 12.00 98.96 90.00 MWD
10358.09 90.00 229.70 8960.30 -132.00 602.74 5960979.20 664735.43 12.00 104.52 90.00 MWD
10375.00 90.00 227.67 8960.30 -143.16 590.04 5960967.77 664722.98 12.00 116.25 270.00 MWD
10400.00 90.00 224.67 8960.30 -160.48 572.01 5960950.07 664705.33 12.00 134.36 270.00 MWD
10425.00 90.00 221.67 8960.30 -178.71 554.90 5960931.47 664688.64 12.00 153.35 270.00 MWD
10450.00 90.00 218.67 8960.30 -197.81 538.78 5960912.02 664672.93 12.00 173.17 270.00 MWD
10475.00 90.00 215.67 8960.30 -217.73 523.68 5960891.78 664658.27 12.00 193.75 270.00 MWD
10500.00 90.00 212.67 8960.30 -238.41 509.64 5960870.79 664644.69 12.00 215.05 270.00 MWD
10525.00 90.00 209.67 8960.30 -259.80 496.70 5960849.13 664632.22 12.00 237.00 270.00 MWD
10550.00 90.00 206.67 8960.30 -281.84 484.90 5960826.84 664620.91 12.00 259.55 270.00 MWD
10575.00 90.00 203.67 8960.30 -304.46 474.27 5960803.99 664610.78 12.00 282.63 270.00 MWD
10583.09 90.00 202.70 8960.30 -311.90 471.09 5960796.48 664607.75 12.00 290.21 270.00 MWD
10600.00 91.91 203.39 8960.02 -327.46 464.47 5960780.79 664601.48 12.00 306.05 20.00 MWD
10625.00 94.72 204.42 8958.57 -350.27 454.36 5960757.76 664591.87 12.00 329.30 20.01 MWD
10650.00 97.54 205.46 8955.90 -372.81 443.88 5960735.00 664581.89 12.00 352.29 20.07 MWD
10672.09 100.03 206.39 8952.53 -392.44 434.34 5960715.16 664572.77 12.00 372.34 20.18 MWD
10675.00 99.70 206.51 8952.03 -395.01 433.06 5960712.57 664571.56 12.00 374.96 160.00 MWD
10700.00 96.88 207.54 8948.42 -417.04 421.82 5960690.30 664560.80 12.00 397.48 160.02 MWD
10725.00 94.06 208.56 8946.04 -439.00 410.12 5960668.09 664549.58 12.00 419.95 160.17 MWD
10750.00 91.23 209.57 8944.89 -460.83 397.99 5960646.01 664537.93 12.00 442.30 160.27 MWD
10761.09 89.98 210.02 8944.77 -470.46 392.48 5960636.26 664532.63 12.00 452.17 160.31 MWD
10775.00 89.86 208.36 8944.79 -482.60 385.70 5960623.98 664526.12 12.00 464.60 266.00 MWD
10800.00 89.65 205.36 8944.89 -504.90 374.40 5960601.44 664515.31 12.00 487.39 266.00 MWD
10825.00 89.45 202.37 8945.09 -527.76 364.29 5960578.36 664505.70 12.00 510.69 266.01 MWD
10836.09 89.35 201.04 8945.21 -538.06 360.19 5960567.97 664501.83 12.00 521.17 266.04 MWD
10850.00 89.35 202.71 8945.36 -550.97 355.01 5960554.96 664496.93 12.00 534.29 90.00 MWD
10875.00 89.36 205.71 8945.64 -573.76 344.75 5960531.94 664487.18 12.00 557.53 89.98 MWD
10900.00 89.36 208.71 8945.92 -595.99 333.33 5960509.47 664476.24 12.00 580.26 89.95 MWD
10925.00 89.37 211.71 8946.20 -617.59 320.75 5960487.60 664464.14 12.00 602.41 89.91 MWD
BP Alaska
by
Baker Hughes INTEQ Planning Report
s,~R ~
s
INTEQ
Company: BP AmoCO Date: 3/9!2006 Time: 19:26.06 Page: 4
Field: Prudhoe Bay Go-ordinate(NE) Reference: Wall: C-16, True. North
Site::. PB' C Pad Vertkai (TVD}Reference: C-16A[ 61.8
Well: C-16 SeMi on (VS) Reference: Welt (4i00N, 0.OQE,182.60Azi)
Wetlpat6: Plan 6, C-16B Survey Calculation Methode Minimum Curvature Db: Qrade
Survey
NID Ines Azim Sys TVD N/S FJW MapN MapE DIS VS ` TFO Tool
ft deg deg ft' ft ft ft ft deg/f00ft ft' ' "deg
10950.00 89.37 214.71 8946.48 -638.50 307.06 5960466.40 664450.91 12.00 623.92 89.88 MWD
10975.00 89.38 217.71 8946.75 -658.67 292.29 5960445.91 664436.59 12.00 644.74 89.85 MWD
11000.00 89.39 220.71 8947.02 -678.04 276.49 5960426.21 664421.21 12.00 664.80 89.81 MWD
11025.00 89.40 223.71 8947.28 -696.55 259.69 5960407.33 664404.83 12.00 684.06 89.78 MWD
11050.00 89.42 226.71 8947.54 -714.16 241.95 5960389.34 664387.48 12.00 702.45 89.75 MWD
11075.00 89.43 229.71 8947.79 -730.82 223.32 5960372.28 664369.21 12.00 719.94 89.72 MWD
11100.00 89.45 232.71 8948.03 -746.48 203.83 5960356.21 664350.07 12.00 736.46 89.69 MWD
11125.00 89.47 235.71 8948.27 -761.09 183.56 5960341.15 664330.12 12.00 751.98 89.66 MWD
11150.00 89.49 238.71 8948.49 -774.63 162.54 5960327.16 664309.41 12.00 766.46 89.63 MWD
11175.00 89.51 241.71 8948.71 -787.05 140.85 5960314.27 664287.99 12.00 779.85 89.61 MWD
11200.00 89.53 244.71 8948.92 -798.31 118.54 5960302.52 664265.93 12.00 792.11 89.58 MWD
11225:00 89.56 247.71 8949.12 -808.40 95.66 5960291.94 664243.29 12.00 803.22 89.55 MWD
11236.09 89.57 249.04 8949.20 -812.48 85.35 5960287.63 664233.07 12.00 807.77 89.53 MWD
11250.00 89.57 247.37 8949.31 -817.64 72.44 5960282.19 664220.27 12.00 813.52 270.00 MWD
11275.00 89.57 244.37 8949.50 -827.86 49.62 5960271.48 664197.69 12.00 824.76 270.01 MWD
11300.00 89.57 241.37 8949.68 -839.26 27.38 5960259.60 664175.70 12.00 837.15 270.04 MWD
11325.00 89.58 238.37 8949.87 -851.80 5.76 5960246.58 664154.36 12.00 850.67 270.06 MWD
11350.00 89.58 235.37 8950.05 -865.46 -15.18 5960232.47 664133.73 12.00 865.26 270.08 MWD
11375.00 89.59 232.37 8950.23 -880.20 -35.37 5960217.30 664113.87 12.00 880.90 270.10 MWD
11400.00 89.59 229.37 8950.41 -895.97 -54.76 5960201.11 664094.83 12.00 897.54 270.12 MWD
11425.00 89.60 226.37 8950.59 -912.74 -73.30 5960183.94 664076.66 12.00 915.13 270.15 MWD
11450.00 89.61 223.37 8950.76 -930.45 -90.93 5960165.85 664059.42 12.00 933.62 270.17 MWD
11475.00 89.62 220.37 8950.93 -949.07 -107.62 5960146.87 664043.14 12.00 952.97 270.19 MWD
11500.00 89.63 217.37 8951.09 -968.53 -123.31 5960127.08 664027.88 12.00 973.12 270.21 MWD
11525.00 89:64 214.37 8951.25 -988.78 -137.96 5960106.51 664013.68 12.00 994.02 270.23 MWD
11550.00 89.66 211.37 8951.40 -1009.78 -151.52 5960085.22 664000.58 12.00 1015.61 270.25 MWD
11575.00 89.67 208.37 8951.55 -1031.45 -163.97 5960063.28 663988.60 12.00 1037.83 270.26 MWD
11600.00 /89.69 205.37 8951.69 -1053.75 -175.27 5960040.75 663977.79 12.00 1060.62 270.28 MWD
11625.00 89.70 202.37 8951.82 -1076.61 -185.39 5960017.67 663968.18 12.00 1083.91 270.30 3.50"
• •
jtti iTtt,'tti fiTt~-liltf ii7t ll,~ ~t#r.Ffaj ~ {i,~} t~i i.. i$
I~ ~ ~~i'r ~~ ~ ~ til' Sktr a~~i ~~11 ~ ~~~~1~1 i~f~.l~~I ~1~1 ~~ /
IF ~ ~ E4-r ~ i,;7~- t r i.'_ jrr SYr 1'7 I, I,-
r 'rill Ft LLB*4 L+- t r ~'~ !-.+~ 4-i $ i r
~~1 - G- ,_ t1+11:{,~ ,r,~._,~,~ ri~.~~r~~l~ifillit lf~T:~lii ~~~~~~-1i ~
...~ ,~~+~I~1.. C~. r+.:?tl I ~.i r~i1 t l; tlfi + ~~ r r 1. i. 11 i li_ $ ~.
;~.. III r11i t#rl r~l, +r~f f~~' „hi ~.
III I t ,: ~~~, 't t ~ , , ~_,.
~~ ritl tr~~~til, I ik~iftl iiiE l~ ~ !~ '~~r)
:I .~ .: rl~ .t-~
i
~ii
IIII
a
i
`I-i I.,: rlll,l I 1 ' '~ ~~.'_ { +, ~ 1 ~' Ga .ri
~r~ ifTr frf~ r~1
r .+ ,, /
4` !,{lt ~ri.' a 1#
_ 8
~ .
`~ ~ '$~
,\ 8
~~._q $,
L:~ ~
Ir .
l~' ~ $ w ~,
~J
~\
~~i•f I I I+ I \ ~ $ 3
~~~. ~ '.
~. \ ` 8
\ „ L!
~~~ ~ r~
~~
f~
I
I ).~_,i,~ ~r -_ ~ I_ _i. i - i 1- rl)1 t~ll~ as-~ 7` t:',. ~~
r>>~-a~ ,,~ r ; ~/ ~I'E r~11-h;~ ftE. [~[1 kt~G,~lfl rt ~Ta~~ ~~a ~ ~
LF -u tit , i r ~t~. rrr: +r r n ,~~ ~ .:t ~t ~-~;t+/ )rr. ~9
+#~_ ~+ 1 f,ti~ltff Ali -~~t~ rt l~_~tfi filf~l-~i~f I~ 1 (~~E iI~1-~jff t`rl ~' tl({[lLl~i ,,~~ {is
ii ~ . s L t ! t , I + ~ ~-t I h i 1 1 ~ I ! !.1.4. r l : _ ' ~ + . 'i y'j~i -r tt r ~'-t. -} . -.. -k
)~ t' ~ ±~i~'r+, 1rr~,rft of fftt ,rr# irtl aT i t i! kl~i Illl 1}1i r;r !rti~fk~i ~fC± f
~1t1-)}t tt+-!~}-It t~ ;~t~(r Cf?~ t1~t~1:~~fL~, t(lf+~r~t if[It~I~~iT~~~a~~ IC,i~I~r~ rrl~~~ ~
I: ~...,t I. i , ~. ~ #
!ulAl00L)!')4LON/,')4105
...... ~ ...._ _._~i11
g ~ ~~~~~~eFFF
s %.~receY-ACa
~ jc :ssaasa ^` i~3p9:B?S$
•Y 8:888.88888888 ~ $?"~'~F939'~
ww~~ 8'= °:YSB:YYY::iYY ~ ~ 8888888888
~V ~~ „ zsw ; 8:888888888888 - ~~~~~~
~/~ :s:::::a:::::
V/ - a ; 8 ~ t'O•e i ..~. - k 88'89®7fBH
_ 8 ~ i~~Ss` E .9::S88Y::E::
s ; ::s°ssss: ~
m 3i ~ffi 'F~ ~ g~~8• _ :ii8:i3ii¢ssi R g
:::~YYY88:::: ce8888EE888E8
i°8~^Aa~:AR•
~ •ssaasosssssa.a _~aa~^a^EE^ee?
E.a3i::aEE^e E: _~ .BRRAAA. „R3
$N
8
m
8 N
Y~
,~
:
8
• •
are
L
~_
~ C-16B
BAG
7 1 /16" 5000 psi.
of pipes
cross
of pipe/slips
Blind/Shears
TOTs ~
2 3/8" combi ram/slips ~ 7 1/16" 5000psi
Mud Cross I I Mud Cross
7 1 /16" 5000psi
variable bore pipe 3 1/2"-2 3l8"
TOTs -
2 3/8" combi ram/slips ~ 7 1/16" 5000psi
ab Valy
Flow Tee
• •
SONDRA D STEWMAN
BP EXPLORATION AK INC ~~Master ~;
PO BOX 196612 M8 7-5 card Check ss-sn2sz 145
ANCHORAGE, AK 99519-6612
~3 -~c~-c~c~
.DATE
PAY TO THE
ORDER OF ,.
First. National "k Alaska ~ CQ~J
Anchor a AK 99501 DOLLARS
.MEMO 1
U` ~ ~ ~~
~: 1 2 5 2 0 0 0 6 0 ~: 9 9 14 ~^~ 6 2 2 7 •~~ 15 6 4 ~~^ 0
l45
• •
TRANSMITTAL LETTER CHECKLIST
WELL NAME -~R~d ~-~~~
PTD# ,~~~'• ~ ~'
Development Service Exploratory Stratigraphic Test
Non-Conventional Well
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS TEXT FOR APPROVAL LETTER
WHAT (OPTIONS)
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well ,
(If last two digits in permit No.
API No. 50- - -
API number are ,
between 60-69) Production should continue to be reported as a function of the
original API number stated above.
PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name ( PH) and API number
(50- - -) from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTION 25.05. Approval to perforate and produce /inject is contingent
upon issuance of a conservation order approving a spacing
exception. assumes the
liability of any protest to the spacing exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
through target zones.
Please note the following special condition of this permit:
Non-Conventional production or production testing of coal bed methane is not allowed
Well for (name of welly until after ~Com~any NameZhas designed and
implemented a water well testing program to provide baseline data
on water quality and quantity. (Company Name) must contact the
Commission to obtain advance approval of such water well testing
ro ram.
Rev: 1/25/06
C:\j ody\transmittal_checkl ist
WELL PEttMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 _
PTD#:2060510 ' Company .BP EXPLORAIIQN (ALASKAN-INC ___ ___ _' Initial ClasslType _ __ _ Well Name: _PRUDHOE BAY UNIT C-16B _____Program DEV _ Well bore seg [
_f)EV! PEND___GeoArea Q90 ___ Unit 11650 _ On/Off Shore On __ Annular Disposal
Administration ~1 Permit-fee attached____ __________________________________.. Yes
~,2 Lease number appropriate Yes -
',3 Unique well-name-and number - - - - ... _ _ Yes -
~4 Well located in a defined pool - _ _ - _ - _ _ . - . _ _ _ Yes - - . _ _ - - - -
~5 Well located proper distance-from drilling unitboundary - - Yes - - - .. - -
~'6 Well locatedproperdstancef[omotherwells------___ -----------.--- Yes- -- ---.----- ---------------- -- ------- -- -.. ----.
17 Sufficient acreageayail_ableindrillingunit----_--------------____--,_ Yes- - ------- -__
~8 If deviated, is wellbore platincluded . _ _ - - - . , _ _ _ _ - .. _ _ _ _ - . _ Yes _ - - - - - _ - -
~9 Operator only affected party---- ------ --------------------- _-- Yes_
'110 Operator has appropriate-bond in force. - - - - - - . - - - Yes - - . - - - _ . _ - - - - - - - - -
11 Permit-can be issued without Gonseruation order_ _ - - - - Yes
12 Permit can be issued without administ(ative-approval _ _ - Yes _ _ . - _ _ _ . - - _ _ _ _ _ _ _ _ _ _ _ -
Appr Date
'~13
Can permit be approved before 15-day wait- - - -
Yes
-
RPC 414/2006 14 Well located within area and strata authorized by Injection Order # (put 10# in-comments)-(For_ NA- - -
15 Allwells-within 1/4-mile area of review identified (For sere-ice well only) - - - - - - - . _ NA-
16 _Pre-pr9duced injector; duration of pre production less than.3 months_(F4r service well only) - NA . - - -
ACMP-Finding of Constskency-has been issued-forthis project- - - - - - - - - - - - - - - - - - - NA- _ _ _ _ _ _ _ _ _ - _ - - _ . - - _ . _ ... - _
~18 Conductor stung provided - - ~. .
Engineering ~19 Surface casing protects all known-U$DWs . - NA- - _
20 CMT-vol-adequate_to circulate.on conductor& surfcsg - - - - - - - - - - - - - - - - - NA_ _ _ _ - - - - - _
X21 CMT vol_ adequate to tie-in long string tosurf csg- - - - - - - - - - - - - - - - - - - - - _ _ ~- - - - - - - - - - - - - - -
~I22
I CMT-will coyer all knownproductiye horizons- - - - _ Yes Adequate excess,
!~23 Casing designs adegtate for C,_T, B &-petmaf[ost- - - - - - . Yes -
----------------
24 Adequate tankage-or reserve pit _ - - - - . - - _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ CTDIJ. -
',25 If a.re-drill, has_a-10-403 for abandonment been approved . - _ - - - - - - - - - - - - - - - - Yes - - _ . _ _ _ _ _ _ _ - _ . _ _ -
I26 Adequate wellbore separation.proposed- - - - - - Yes
27 If diverier requrred, does d meet regulatrgns- - - - - . _ NA _ _ - Sidetrack. -
28 Drilling fluid-program schematic_& equip list adequate_ Yes Max AmN 8ai ppg.
Appr Date ~29 BOPEs, dothey_meet_regulation - - Yes _ - .
WGA 4!512006 30 BOPE-press rating appropriate; test to-(put prig in comments)- _ - Yes .. - - Test to 3500_psi. -tVt$P 2220 psi.....
'131 Choke manifold complies wlAPI-RP-53 (May 84)- _ - _ _ - _ _ - - _ Yes - _ _ _ _ _
32 Work will occur without operation shutdo-wn_ - - . - - - - Yes - - -
33 Is presence of H2S gas probable. NO _ 20 ppm_ max-on pad.- .
34 Mechanical condition of wells within AOR verified (Fo[service well only) - - - - _ NA- - - . -
135 Permit.can be issued wlo hydrogeqsulfide measures No
-----.
Geology
I36
.Data-presented on potential overpressure zones - - - .
NA
37 Seismic_analysis-of shallpwgas zones- - - _ _ NA- - _ _ -
Appr Date x,38 Seabed condjtion survey.(ifoff-shore) - NA - _ . ... . _ . -
RPC 41412006 '139 Contact namelphone for weekly_progress reports-[exploratory only] - - - - - - - - - - - - - - - - NA-
Geologic Engineering i
Commissioner: Date: Commissioner: Date o is io r Date
..
n(s- ---~ f~1~__ -- _- --- ~--.~--off--------
•
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special efforl has been made 1o chronologically
organize this category of information.
c-16b.tapx
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Apr 22 15:23:52 2008
Reel Header
Service name .............LISTPE
Date . ...................08/04/22
Ori in ...................STS
Ree~ Name. .... ........UNKNOWN
Continuation Number......01
Previous Reel Name.......UNKNOWN
Comments .................STS LIS writing Library.
Tape Header
Service name .............LISTPE
Date .....................08/04/22
Origin ...................sTS
Tape Name. .... ........UNKNOWN
Continuation Number......01
Previous Tape Name.......UNKNOWN
Comments .................STS LIS Writing Library.
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
w-0004391154
s. LATZ
J. EGBEJIMBA
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
scientific Technical services
scientific Technical services
C-16B
500292043802
BP Exploration (Alaska) inc.
Sperry Drilling Services
22-APR-08
MWD RUN 3 MWD RUN 4
W-0004391154 W-0004391154
S. LATZ B. JAHN
J. EGBEJIMBA R. WHITLOW/
19
11N
14E
116
1218
61.77
35.18
Page 1
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
c-16b.tapx
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
4.125 7.000 9425.0
8904.0
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED
DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS).
3. THIS WELL WAS DRILLED FROM A WHIPSTOCK IN THE C-16A
WELLBORE. THE TOP OF THE
WHIPSTOCK WAS AT 9425'MD/8928'TVDSS. THE WHIPSTOCK
WAS POSITIONED AND THE
WINDOW WAS MILLED DURING MWD RUN 1. NO DATA ARE
PRESENTED FOR THIS RUN.
4. MWD RUNS 2,4 COMPRISED DIRECTIONAL AND NATURAL GAMMA
RAY (PCG), UTILIZING
SCINTILLATION DETECTORS. UPHOLE SGRD TIE-IN DATA WERE
MERGED WITH
MWD DATA FROM RUN 2.
5. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM)
UTILIZING GEIGER-
MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
EWR DATA OVER THE RUN 2 INTERVAL WERE ACQUIRED WHILE
RIH FOR MWD RUN 3.
THESE MAD DATA WERE MERGED WITH THE RUN 3 MWD DATA.
6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A SCHLUMBERGER CASED
HOLE GAMMA RAY LOG RUN IN C-16B ON 19 MAY 2006. THESE
DATA WERE PROVIDED BY
D.DORTCH (SAIC/BP) ON 22 FEBRUARY 2008, PER DOUG
STONER(BP). LOG HEADER DATA
RETAIN ORIGINAL DEPTH REFERENCES.
7. MWD RUNS 1-4 REPRESENT WELL C-16B WITH API#:
50-029-20438-02. THIS WELL
REACHED A TOTAL DEPTH (TD) OF 11465'MD/8952'TVDSS.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SGRD = SMOOTHED NATURAL GAMMA RAY.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
Page 2
c-16b.tapx
File Header
Service name... .......STSLIB.001
service sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type. ............LO
Previous File Name.......STSLI6.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 9106.0 11432.5
ROP 9135.5 11462.5
RPX 9424.0 11121.5
RPS 9424.0 11121.5
RPM 9424.0 11121.5
RPD 9424.0 11121.5
FET 9424.0 11121.5
BASELINE CURVE FO R SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH GR
9106.0 9114.5
9118.5 9127.0
9126.5 9135.0
9131.0 9139.0
9133.5 9142.5
9134.5 9144.0
9138.5 9148.5
9140.0 9149.5
9417.5 9416.0
9419.0 9417.5
9420.5 9418.5
9428.0 9426.5
9433.0 9433.5
9434.5 9435.0
9443.5 9445.0
9448.0 9447.5
9466.5 9467.0
9478.5 9479.0
9481.5 9481.5
9487.0 9488.0
9489.5 9490.5
9511.5 9512.0
9518.5 9517.5
9526.5 9526.0
9542.0 9542.0
9546.0 9547.0
9552.5 9554.0
9587.0 9586.5
9592.5 9591.5
9596.5 9595.5
9601.5 9599.0
9609.5 9608.0
Page 3
c-16b.tapx
9612.0 9611.5
9622.0 9622.0
9641.5 9641.0
9660.5 9660.0
9671.5 9671.0
9676.5 9676.5
9678.5 9679.0
9692.0 9692.0
9695.0 9694.5
9699.0 9699.0
9770.0 9772.0
9779.0 9779.0
9821.5 9820.0
9829.0 9828.5
9836.0 9834.5
9845.5 9844.0
9848.0 9848.0
9852.0 9853.0
9856.5 9858.0
9857.5 9859.0
9860.5 9862.0
9864.0 9866.0
9868.0 9870.0
9877.0 9878.5
9905.5 9906.0
9913.0 9911.5
9929.0 9928.0
9937.5 9936.0
9943.5 9941.5
9945.0 9943.0
9949.5 9946.5
9957.0 9954.0
9962.0 9960.0
9963.5 9962.0
9967.5 9966.5
9970.0 9968.5
9976.5 9974.5
9989.5 9990.0
9995.5 9994.5
9998.0 9998.0
9999.5 9999.5
10007.0 10010.5
10010.5 10015.0
10021.0 10024.0
10030.5 10034.5
10031.5 10036.0
10032.5 10038.0
10034.0 10039.5
10044.5 10050.0
10051.0 10056.5
10059.5 10064.0
10074.5 10079.5
10083.0 10086.5
10084.0 10088.5
10090.5 10097.0
10096.0 10102.5
10098.5 10104.0
10107.5 10113.0
10112.5 10118.5
10137.0 10139.5
10140.5 10142.0
10145.0 10146.5
10152.0 10153.5
Page 4
c-16b.tapx
10179.5 10183.0
10193.5 10196.5
10200.0 10202.5
10208.5 10210.5
10216.5 10218.0
10235.0 10234.0
10248.5 10248.5
10257.5 10259.0
10279.0 10279.0
10286.5 10289.5
10288.0 10292.0
10302.0 10306.0
10303.5 10308.0
10310.5 10315.0
10320.5 10325.0
10333.5 10336.5
10341.5 10343.5
10343.5 10345.5
10349.5 10349.0
10355.0 10354.0
10364.0 10363.0
10376.5 10377.0
10409.0 10410.0
10427.5 10433.0
10446.5 10450.0
10452.5 10457.0
10455.0 10461.5
10464.0 10469.5
10473.0 10477.5
10479.0 10483.0
10495.5 10499.5
10499.5 10501.5
10515.0 10517.0
10524.0 10528.5
10528.0 10533.5
10534.5 10539.5
10547.0 10553.0
10562.0 10567.5
10581.0 10586.5
10592.5 10599.0
10595.0 10600.5
10602.0 10605.5
10604.0 10607.5
10610.5 10613.0
10617.5 10621.5
10627.5 10631.5
10639.0 10643.5
10661.5 10669.0
10686.0 10693.5
10714.5 10720.0
10747.5 10756.0
10753.5 10763.5
10762.0 10771.0
10764.0 10773.0
10768.5 10777.5
10774.0 10781.0
10780.0 10787.5
10784.5 10791.0
10788.0 10795.0
10791.5 10799.0
10807.0 10814.0
10817.5 10826.0
10828.0 10834.5
Page 5
c-16b.tapx
10839.0 10846.0
10843.5 10850.5
10851.0 10858.0
10858.5 10863.5
10861.5 10868.5
10879.5 10888.0
10895.5 10902.0
10907.5 10909.0
10910.5 10913.5
10928.0 10932.0
10935.5 10940.5
10943.0 10947.5
10947.5 10952.0
10954.5 10958.0
10959.5 10964.0
10983.0 10986.0
10992.0 10994.5
11006.5 11007.5
11008.0 11009.0
11012.0 11013.5
11030.5 11032.0
11054.5 11055.5
11063.5 11065.0
11068.5 11070.5
11071.5 11074.0
11085.0 11088.0
11094.5 11097.5
11102.5 11105.0
11108.0 11107.5
11112.0 11113.5
11124.5 11122.0
11126.0 11124.5
11130.5 11130.5
11169.0 11171.5
11177.0 11180.0
11179.5 11183.0
11190.0 11194.5
11197.0 11201.0
11270.5 11273.0
11272.0 11274.5
11292.5 11294.5
11317.5 11320.5
11320.5 11324.0
11323.0 11325.5
11462.5 11465.0
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MwD 2 9114.5 9851.0
MwD 3 9851.0 11155.0
MwD 4 11155.0 11465.0
REMARKS: MERGED MAIN PASS.
Data Format specification Record
Data Record Type... ..........0
Data specification Block Type.....0
Logging Direction .................DOwn
Optical log depth units...........Feet
Data Reference Point ..............undefined
Page 6
•
~ s
c-16b.tapx
Frame Spacing.. ..... ............60 .lIN
Max fr ames per record .............undefined
Absent value ... ...................-999
Depth Units. .. .. .....
Datum Specifica tion Block sub-type...0
Name Serv ice order units size Nsam Rep Code offset Channel
DEPT FT 4 1 68 0 1
RPD MWD OHMM 4 1 68 4 2
RPM MWD OHMM 4 1 68 8 3
RPS MWD OHMM 4 1 68 12 4
RPX MWD OHMM 4 1 68 16 5
FET MWD HOUR 4 1 68 20 6
GR MWD API 4 1 68 24 7
ROP MWD FT/H 4 1 68 28 8
First Last
Name Serv ice unit Min Max Mean Nsam Reading Reading
DEPT FT 9106 11462.5 10284.3 4714 9106 11462.5
RPD MWD OHMM 0.44 2000 25.3052 3396 9424 11121.5
RPM MWD OHMM 5.57 2000 20.383 3396 9424 11121.5
RPS MWD OHMM 0.62 2000 19.2053 3396 9424 11121.5
RPX MWD OHMM 0.4 2000 15.9245 3396 9424 11121.5
FET MWD HOUR 0.18 25.24 5.84143 3396 9424 11121.5
GR MWD API 8.89 354.8 65.8245 4142 9106 11432.5
RoP MwD FT/H 0.72 742.22 101.205 4146 9135.5 11462.5
First Reading For Entire File..........9106
Last Reading For Entire File...........11462
File Trailer
Service name... .......STSLIB.001
service sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File TyC~e ................L0
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name... .......STSLI6.002
service sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type. ............LO
Previous File Name.......sTSLIB.001
comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
Page 7
c-16b.tapx
FI LE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9114.5 9820.0
OP 9145.0 9851.0
$
LOG HEADER DATA
DATE LOGGED: 14-MAY-06
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 7.75
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 9851.0
TOP LOG INTERVAL (FT): 9425.0
BOTTOM LOG INTERVAL (FT): 9851.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 80.8
MAXIMUM ANGLE: 91.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
PCG Natural gamma ray TLG002
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 4.125
DRILLER'S CASING DEPTH (FT): 9425.0
BOREHOLE CONDITIONS
MUD TYPE: Polymer
MUD DENSITY (LB/G): 8.60
MUD VISCOSITY (S): 65.0
MUD PH: 8.7
MUD CHLORIDES (PPM): 37500
FLUID LOSS (C3): .O
RESISTIVITY (OHMM) AT TEMPERATU RE (DEG F)
MUD AT MEASURED TEMPERATURE (MT): .000 .O
MUD AT MAX CIRCULATING TERMP ERATURE: .000 137.5
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .O
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
Data Format specification Record
Data Record Type... ..........0
Data Specification Block Type.....0
Logging Direction .................DOwn
optical log depth units...........Feet
Data Reference Point ..............undefined
Frame Spacing....... ............60 .lIN
Max frames per record .............undefined
Absent value ......................-999
Page 8
c-16b.tapx
Depth Units. .. .. .....
Datum specification Block sub-type...0
Name service order units size Nsam Rep code offset channel
DEPT FT 4 1 68 0 1
GR MWD020 API 4 1 68 4 2
ROP MWD020 FT/H 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9114.5 9851 9482.75 1474 9114.5 9851
GR MWD020 API 16.28 354.8 46.7832 920 9114.5 9820
ROP MWD020 FT/H 8.09 289.09 95.885 917 9145 9851
First Reading For Entire File..........9114.5
Last Reading For Entire File...........9851
File Trailer
Service name... .......STSLIB.002
service sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical- Record..65535
File Type ................L0
Next File Name...........STSLIB.003
Physical EOF
File Header
service name... .......STSLIB.003
service Sub Level Name...
version Number.. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type. ............LO
Previous File Name.......ST5LI6.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
FET 9422.0 11120.0
RPM 9422.0 11120.0
RPS 9422.0 11120.0
RPx 9422.0 11120.0
RPD 9422.0 11120.0
GR 9820.5 11110.5
ROP 9851.5 11155.0
LOG HEADER DATA
Page 9
c-16b.tapx
DATE LOGGED: 15-MAY-06
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE sOFTWARE VERSION: 4.3
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 11155.0
TOP LOG INTERVAL (FT): 9851.0
BOTTOM LOG INTERVAL (FT): 11155.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 82.8
MAXIMUM ANGLE: 99.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
GM Dual GR 82758
EWR4 ELECTROMAG. RESIS. 4 178424
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT): 9425.0
BOREHOLE CONDITIONS
MUD TYPE: Polymer
MUD DENSITY (LB/G): 8.60
MUD VISCOSITY (s): 46.0
MUD PH: 8.6
MUD CHLORIDES (PPM): 37500
FLUID LOSS (C3): 6.2
RESISTIVITY (OHMM) AT TEMPERATURE (DEG F)
MUD AT MEASURED TEMPERATURE (MT): .110 74.0
MUD AT MAX CIRCULATING TERMPERATURE: .050 161.8
MUD FILTRATE AT MT: .130 73.0
MUD CAKE AT MT: .160 64.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
Data Format specification Record
Data Record Type... ..........0
Data Specification Block Type.....0
Logging Direction .................DOwn
Optical log depth units...........Feet
Data Reference Point ..............undefined
Frame Spacing....... ............60 .lIN
Max frames per record .............undefined
Absent value ................ ....-999
Depth units. .. .. .....
Datum specification Block sub-type...0
Name service order units size Nsam Rep code offset channel
DEPT FT 4 1 68 0 1
RPD MWD030 OHMM 4 1 68 4 2
RPM MWD030 OHMM 4 1 68 8 3
Page 10
c-16b.tapx
RPS MWD030 OHMM 4 1 68 12 4
RPx MWD030 oHMM 4 1 68 16 5
FET MwD030 HOUR 4 1 68 20 6
GR MwD030 API 4 1 68 24 7
ROP MWD030 FT/H 4 1 68 28 8
First Last
Name service unit Min Max Mean Nsam Reading Reading
DEPT FT 9422 11155 10288.5 3467 9422 11155
RPD MwD030 OHMM 0.44 2000 27.5793 3397 9422 11120
RPM MwD030 OHMM 5.57 2000 22.0667 3397 9422 11120
RPS MWD030 OHMM 0.62 2000 20.9289 3397 9422 11120
RPx MWD030 OHMM 0.4 2000 16.4837 3397 9422 11120
FET MWD030 HOUR 0.18 25.24 5.87825 3397 9422 11120
GR MwD030 API 8.89 322.97 79.6197 2581 9820.5 11110.5
ROP MWD030 FT/H 1.27 742.22 98.6534 2608 9851.5 11155
First Reading For Entire File..........9422
Last Reading For Entire File...........11155
File Trailer
Service name... .......ST5LI6.003
service sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type ................Lo
Next File Name...........STSLIB.004
Physical EOF
File Header
service name... .......ST5LI6.004
Service Sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type. ............LO
Previous File Name.......5T5LI6.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11111.0 11435.0
ROP 11155.5 11465.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
18-MAY-06
Page 11
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
~r
c-16b.tapx
Insite
7.75
Memory
11465.0
11155.0
11465.0
87.2
91.1
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEG F)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
Data Format Specification Record
Data Record Type... ..........0
Data Specification Block Type.....0
Logging Direction .................DOwn
optical log depth units...........Feet
Data Reference Point ..............undefined
Frame Spacing....... ............60 .lIN
Max frames per record .............Undefined
Absent value ......................-999
Depth Units. .. .. .....
Datum specification Block sub-type...0
TOOL NUMBER
TLG002
3.750
9425.0
Polymer
9.60
65.0
8.9
126500
6.2
.000 .0
.000 162.8
.000 .0
.000 .0
Name Service order units size Nsam Rep Code offset channel
DEPT FT 4 1 68 0 1
GR MWD040 API 4 1 68 4 2
ROP MwD040 FT/H 4 1 68 8 3
Page 12
c-16b.tapx
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11111 11465 11288 709 11111 11465
GR MwD040 API 20.35 123.39 39.3561 649 11111 11435
ROP MWD040 FT/H 0.72 273.18 119.058 620 11155.5 11465
First Reading For Entire File..........lllll
Last Reading For Entire File...........11465
File Trailer
Service name... .......STSLI6.004
service Sub Level Name...
version Number. ........1.0.0
Date of Generation.......08/04/22
Maximum Physical Record..65535
File Type ................Lo
Next File Name...........STSLIB.005
Physical EOF
Tape Trailer
Service name .............LISTPE
Date . ...................08/04/22
Origin ...................STs
Tape Name. .... ........UNKNOWN
Continuation Number......01
Next Tape Name...........UNKNOWN
Comments .................STS LIS Writing Library.
Reel Trailer
Service name .............LISTPE
Date . ...................08/04/22
Ori 9in ...................STS
Reel Name. .... ........UNKNOWN
Continuation Number......01
Next Reel Name...........UNKNOWN
Comments .................STS LIS writing Library.
Physical EOF
Physical EOF
End Of LIS File
scientific Technical services
scientific Technical services
Page 13