Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout206-051•, • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original fife, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~ ~ - ®~~ Well History File Identifier Organizing (done) ^ Two-sided III (IIIII II III II III ^ Rescan Needed III (IIIII II II III III RESCAN DIGITAL DATA OVERSIZED (Scannable) ~olor Items: iskettes, No. ' ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: /s/ ProjectProofing III IIIIIIIIIII IIIII BY: Maria Date: ~/~ D ~ /s/ ~ P Scanning Preparation ~_ x 30 = + ~~ =TOTAL PAGES (Count does not include cover sheet) BY: Maria Date: /s/ Production Scanning III (IIIII IIIII II III Stage 1 Page Count from Scanned File: ;~) ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ,YES NO BY: Maria Date: / ~ D 8 /s/ ~~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II (IIII IIIII ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III (IIIII III IIII III 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 RECEIVED' Mr. Tom Maunder AUG 31 2011 Alaska Oil and nd Gas Conservation Commission 333 Gam Cam. mss�o� 333 West 7 Avenue Anchorage, Alaska 99501 Ars h, rage Subject: Corrosion Inhibitor Treatments of GPB C -Pad - 05 Dear Mr. Maunder, 1 l0 B Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB C- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) C -Pad 7/19/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal C -01A 2030100 500292012101 0.3 NA 0.3 NA 3.40 11/16/2010 C -02 1730040 500292012300 0.3 NA 0.3 NA 3.40 11/16/2010 C -03B 2051580 500292012402 0.3 NA 0.3 NA 3.40 11/16/2010 C -04B 2060570 500292012502 1.25 NA 1.25 NA 23.80 10/26/2010 C -05A 2010020 500292012601 0.8 NA 0.8 NA 3.40 11/23/2010 C -06B 2061040 500292012702 1 NA 1 NA 5.10 11/22/2010 C -07A 2000520 500292012801 0.3 NA 0.3 NA 1.70 11/22/2010 C -08B 2050110 500292012902 1 NA 1 NA 5.10 11/20/2010 C -09A 2020940 500292036601 0.1 NA 0.1 NA 0.85 11/23/2010 C -10A 2051370 500292037101 0.1 NA 0.1 NA 3.40 11/12/2010 r>. C -11A 2030480 500292038201 0.1 NA 0.1 NA 1.70 11/13/2010 C -12B 2090850 500292038702 2 NA 2 NA 10.20 11/11/2010 C -13A 1971430 500292040401 10.7 NA 10.7 NA 74.80 11/25/2010 C -15A 2090520 500292042701 10.5 NA 10.5 NA 64.60 11/25/2010 C -16B 2060510 500292043802 45 10.0 0.6 7/19/2011 3.40 7/19/2011 C -17B 2040940 500292043902 1 NA 1 NA 6.80 11/13/2010 C -18B 2090710 500292078502 9.6 NA 9.6 NA 69.70 11/23/2010 C -19B 2000050 500292073502 11 NA 11 NA 76.50 10/27/2010 C - 20C 2091300 500292074503 1.9 NA 1.9 NA 10.20 11/11/2010 C -21 1820810 500292074503 1.7 NA 1.7 NA 8.50 11/11/2010 C -22A 2060390 500292075801 0.7 NA 0.7 NA 5.10 11/11/2010 C -23C 2081700 500292077503 25 4.0 0.08 7/15/2011 0.85 7/19/2011 C -24A 2040580 500292081601 Sealed NA NA NA NA NA C -25B 2041090 500292081902 0.7 NA 0.7 NA 3.40 11/22/2010 C -26A 1981450 500292083401 0.8 NA 0.8 NA 3.40 11/22/2010 C -27B 2031860 500292084302 7.5 NA 7.5 NA 39.10 11/21/2010 C -28B 2100630 500292086702 1 NA 1 NA 5.10 11/21/2010 C -29A 1961700 500292147201 23 10.0 0.9 7/15/2011 6.80 7/19/2011 C -30A 2081690 500292177701 0.2 NA 0.2 NA 1.70 11/20/2010 C -31B 2030080 500292177502 0.8 NA 0.8 NA 5.10 11/22/2010 C - 32C 2061390 500292155903 0 NA 0 NA 0.00 11/13/2010 C -33A 2002020 500292237301 1 NA 1 NA 6.80 11/11/2010 C -34A 2060370 500292178501 2.2 NA 2.2 NA 10.20 11/20/2010 C -35B 2061290 500292155302 1.5 NA 1.5 NA 10.20 11/15/2010 C -36A 2000020 500292179001 2 NA 2 NA 10.20 11/13/2010 C -37B 2101000 500292236002 4.7 NA 4.7 NA 30.60 10/28/2010 C -38 1860660 500292157100 0.1 NA 0.1 NA 0.85 11/15/2010 C -39A 2050030 500292238301 1 NA 1 NA 0.85 11/23/2010 C-41A 2041880 500292238501 Sealed NA NA NA NA NA C -42 1930500 500292235700 2.6 NA 2.6 NA 13.60 11/13/2010 c ~ ..~ ti~ ."~'~ '~ w _ .~~,:" ` '~- R MICROFILMED 6/30/2010 DO NOT PLACE ` ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporazy Internet Files\OLK9\Microfilm_Mazker.doc WIELL L,®G '1cRAl~S1VIl<T'I'~-1L To: State of Alaska July 2, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: C-16B AK-MW-4391154 C-16B: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 50-029-20438-02 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 50-029-20438-02 Digital Log Images: ,~~~ ~UL ~ ~ 2~fl~ 50-029-20438-02 1 Color Log 1 Color Log 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center, MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage,; Alaska 99518° Anchorage, Alaska 99508 Date:. _ Signed: a~iCo-E~( ~ ~CoCQ~ ~~ J~ DATA SUBMITTAL COMPLIANCE REPORT 6/19/2008 Permit to Drill 2060510 Well Name/No. PRUDHOE BAY UNIT C-166 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20438-02-00 MD 11465 TVD 9013 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Tyke Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ~D D Asc Directional5urvey 9406 11465 Open 6/27/2006 Las ~~ 15517vCGamma Ray ~ 8714 11350 Open 10/3/2007 FCNL, GR, NCNL w/EMF and PDS graphics D C Lis 1595Jf~Neutron 8715 11326 Case 2/28/2007 LIS Veri, GR, CNT w/PDS and Tif graphics i ~g Neutron 5 Blu 1 8724 11332 Open 2/28/2008 MCNL, GR, CCL, CNL 19- May-2007 ~RR'pt LIS Verification 9106 11462 Open 5/7/2008 LIS Veri, GR, ROP, RPX, ~ RPS, RPM, RPD, FET ~D C Lis 1622 nduction/Resistivity 9106 11462 Open 5/7/2008 LIS Veri, GR, ROP, RPX, RPS, RPM, RPD, FET Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comme nts ADDITIONAL INFORMATION Well Cored? Y / A~ Daily History Received? N Chips Received? ~I-AL-- Formation Tops ~/ N Analysis .~L1,p1~ Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 6/19/2008 Permit to Drill 2060510 Well Name/No. PRUDHOE BAY UNIT C-16B Operator BP EXPLORATION (ALASKA) INC MD 11465 TVD 9013 Completion Date 5/21/2006 Completion Status 1-OIL Current Status 1-OIL --- Compliance Reviewed By: _ Date: __~ API No. 50-029-20438-02-00 UIC N ~ ~ WELL LOG TRANSMITTAL To: State of Alaska Apri123, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: C-16B AK-MW-4391154 1 LDWG formatted CD rom with verification listing. API#: 5 0-029-2043 8-02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 ~~. Date: s Signed: _ r- ~o~-os~ ~-/6~ao ozlza/oa J~'' G d ~SCIII~t~~~l'I~~~' Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wan ~„ti ~ ~:?JL i n.... 15-25A 12014000 LDL / _~6 '~ 02/20/08 A-12A 11963077 MCNL sr 01119108 GNl-04 12031448 TEMP SURVEY (REVISED) '.~- ~ K (0 01/22108 1 1 P2-32 11968730 USIT - " 11 02/13/08 1 1 17-02 11996384 USIT / O - # '- 02/17/08 1 1 Y-07A 11962781 SCMT '}-1 ~ ' ~ 02103/08 1 1 P2-58 12031456 USIT /90 - ~~ 02/25/08 1 1 MPH-12 12005205 MEM INJ PROFILE ~ _ j~'}Q tt '~ 02115108 1 1 4-14/R-34 11975755 USIT V=e. ~ 02/25/08 1 1 S-126 11968731 JEWELRYIPERF/SBHP .. 9~. 1F ~ 02/15/08 1 1 o~ oneo nrve~~~wn r . ______.._._.____---~-..-__.. ............... ....... ..~. v,.,.,..v v..~vvr~ c.nvn ~v. l3P Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ~~~ i_ , >> ~, ~~, ~_ ~~ ~~; Anchorage, Alaska 99508 Date Delivered: NO. 4612 Company: State of Alaska ~~ Alaska Oil & Gas Cons Comm Dq~a C «. Attn: Christine Mahnken 333 West 7th Ave, Suite 100 , ~~ ~.- t Anchorage, AK 99501 ~ ~ _ Q,"l ~ ~~'~13 Field: P,Bay,Aurora,GNI,Pt.Mac,Milne Pt,Endicott $0 ~~ BL Color CID .2 d~o ~ `) q~~ 1 • Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth ~ Received by: r: ~,~! : , , is 1 ' ~+ ~~ o2iz71os ~G~~Iib~~'t~" N0.4599 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Betn 333 West 7th Ave, Suite 100 Anchorage, AK 98501 Field: P.Bay,Polaris,Lisburne WPII _Inh 8 1 nn rto~ ~nr:.,n nos., o~ r,. ~..- nn W-216 40016312 OH MWD/LWD EDIT S ~- 01/07/08 2 1 LGI-04 11970706 RST ~_~ ~- 12/31/07 1 1 W-45 40016146 OH MWD/LWD EDIT '}- '~ ~ 12/18107 2 1 15-046 12005202 CH EDIT PDC GR (SCMT) ~~ ~ 12/28/07 1 C-16B 11209604 MCNL ~pto. pS ~ / ( 05/19/06 1 1 B-18 11962779 RST 'd 01/05/08 1 1 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~- ;~ ,, ~. i, ~ - Alaska Data & Consulting Services 2525 Gambell Street, Suite 4 ~ Anchorage, AK 99503-28 8 ~ ATTN: Beth ,,qq / W Received by: s c Date 09-28-2007 Transmittal Number:92905 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) F you have any questions, please contact Douglas Dortcn at one rD~, at oo~-~+y ~ ~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02-35B ~OCo'd68 ~ lSS~~ 07-07B ~Cp -O ZSl # t551 ~ C-16B c'bf;9-dam 1 QF t '~ l 5S C-34A ~O(o-(~3~- # f5~~`lS D-07Ba6S l $l ~ f ~~ E-21 B o?~ 5 /~~ *~ Jr~a' 1 G-06A 2b w -bl c~ ~ !'SJ~c~a G-10C o~d(o-00°1 ~ 15~a3 Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 19-66 1 2 14-Jun-06 AOGCC Ceresa Tolley 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well C-16B Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 9,406.46' MD Window /Kickoff Survey: 11,419.25' MD (if applicable) Projected Survey: 11,465.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 Date Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) E~~~vED 1R JUN 2 ~ 2006 ~~ SStOt1 ~p~-- b1 j STATE OF ALASKA ALAS IL AND GAS CONSERVATION COSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~~i~~ ~uw ~ ~ zoos Alaska ~~~ & Gas Cons. Corrlmis~o~ _ a~nrheraae 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAACZS.,os zoAACZS.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 5/21/2006 12. Permit to Drill Number 206-051 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 5/14/2006 13. API Number 50-029-20438-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/18/2006 14. Well Name and Number: PBU C-16B 116 FNL, 1218 FEL, SEC. 19, T11 N, R14E, UM Top of Productive Horizon: 679' FNL, 904' FEL, SEC. 19, T11 N, R14E, UM g. KB Elevation (ft): 61.77' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool Total Depth: 1074' FNL, 1307' FEL, SEC. 19, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD) 11420 + 9012 Ft 4b. Location of Well (State Base Plane Coordinates): Surface: x- 664130 y- 5961098 Zone- ASP4 10. Total Depth (MD+TVD)~PV 11465 + 013 Ft 16. Property Designation: ADL 028305 TPI: x- 664458 y- 5960542 Zone- ASP4 Total Depth: x- 664066 Y- 5960138 Zone- ASP4 11. Depth where SSS set None MD 17. Land Use Permit: th if ff h 19 W t d 20 f P rmafrost Thi k 18. Directional Survey ®Yes ^ No ore , s . a er ep o N/A MSL . c ness o e 1900' (Approx.) 21. Logs Run: MWD /SGRD /SGRC / SROP, MWD / EWR /SGRD /SGRC / SROP, MGR / CCL / CNL ASING, LINER AND EMENTING ECORD CASING ETTING PTH MD ETTING fPTH TVp HOLE OUNT SIZE WT. PER FT. GRADE OP OTTOM OP OTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 12.9 cu ds Concrete 13-3/8" 72# L-80 Surface 2691' Surface 2691' 17-1/2" 3720 cu ft Permafrost II 9-5/8" 47# L-80 Surface 8578' Surface 8278' 12-1/4" 1160 cu ft Class'G', 130 cu ft AS 7" 26# / 29# L-80 2672' 9040' 2672' 8740' 8-1 /2" 401 cu ft Class 'G' 4-1/2" 12.6# L-80 8894' 9425' 8594' 8990' 6" 225 cu ft Class'G' s-vz° X s-3/16° x z-~is• a.a,a i s.za i s., sn L-80 9365' 11456' 8980' 9013' 4-1 /8" 168 cu ft Class 'G' 23. Perforations open.to Production (MD +TVD of Top and, " ' 24. TUBING RECORD Bottom Interval, Slze and Number; if none, state none ): SIZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 8905' 8848' MD TVD MD TVD 9600' - 9660' 9012' -9017' 9880' - 10020' 9022' -9016' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10470' - 10540' 9015' - 9020' 9024' 0 0 0' 9022' ' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 1 580 - 1 71 - 10880' -11420' 9011' - 9012' 2400' Freeze Protect w! 30 Bbls McOH 26• PRODUCTION TEST Date First Production: June 12, 2006 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date of Test 6/13/2006 Hours Tested 4 PRODUCTION FOR TEST PERIOD ,• OIL-BBL 513 GAS-MCF 805 WATER-BBL 22 CHOKE SIZE 53 GAS-OIL RATIO 1,571 Flow Tubing Press. 38 Casing Pressure 1150 CALCULATED 24-HOUR RATE OIL-BBL 3,076 GAS-McF 4,831 WATER-BBL 134 OIL GRAVITY-API (CORK) 27.1 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None ,,,:~' ~ ~ t4 ~ ~ i € ~~ oT w//~o..c~ /d ~O r~it~' S7~O ~'A I~,~ R~DNIS AFL JUN ~ 5 2006 Form 10-407 Revised 12/2003 '~ ~ ~ ~ REVERSE SIDE ~~ (°! L r 28. GEOLOGIC MARK 29' FORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Zone 1 B 10875' 9012' None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. l ~~ T ~~1 V~o Signed Terrie Hubble Title Technical Assistant Date PBU C-16B 206-051 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". Frets 29: List all test information. If none, state "None". FixTrr t0~7 Revised 12/2003 Submit Original Only BP EXPLORATION Operations Summary Report Page 1 of 10 Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task (Code ; NPT Phase Description of Operations I,_ 1 5/12/2006 ~ 17:30 - 18:00 ~ 0.50 RIGD ~ P ~ PRE ~ Rig released from C-34A C 22:OOHrs on 5/12/2006. Prep rig 18:00 - 19:00 1.00 MOB P PRE 19:00 - 21:00 2.00 MOB N WAIT PRE 21:00 - 22:00 1.00 MOB P PRE 22:00 - 00:00 2.00 BOPSU P PRE 5/13/2006 00:00 - 05:00 5.00 BOPSU P PRE 05:00 - 05:15 I 0.251 WHIP I P I I WEXIT 05:15 - 05:30 I 0.251 WHIP I P I I WEXIT 05:30-07:00 I 1.501WHIP IP I (WEXIT 07:00 - 07:30 I 0.501 WHIP I P I (WEXIT 07:30 - 07:45 I 0.251 WHIP I P I I W EXIT 07:45-10:40 I 2.921WHIP IP I (WEXIT 10:40 - 11:20 0.67 WHIP P WEXIT 11:20 - 11:30 0.17 WHIP P WEXIT 11:30-11:40 I 0.171WHIP IP I (WEXIT 11:40 - 12:00 0.33 WHIP P WEXIT 12:00 - 14:00 2.00 WHIP P WEXIT 14:00 - 14:15 0.25 WHIP P WEXIT 14:15 - 14:40 0.42 STWHIP P WEXIT 14:40 - 16:15 I 1.581 STWHIPI P I I WEXIT for move to C-16B. Move rig off C-34A, spot on upper side of pad Wait on site prep MIRU over C-166, Accept Rig at 22:00 hours on 05/12/06 NU BOP's Grease tree valves & perform initial BOPE pressure & function test, while filling rig pits with double slick 120 deg KCL fluid. Spot, R/U hardline to tiger tank & PT to 4000psi, AOGCC test witness waived by Chuck Schevie Offload WS tools and equipment. PU to rig floor. SLB insert 2 RA pip tags into W FD LSXN 4-1/2" monobore whipstock. RA PIP tag to TOWS = 8.9'. Held pre-operations safety meeting. Reviewed well plan, potential hazards & WS setting BHA M/U procedures. M/U WS setting BHA #1 with WFD LSX-N 4-1/2" monobore whipstock, setting adapter, hyd setting tool, BKR FAIV, Sperry MWD/GR, orienter &WFD MHA. Scribe WS tray to MWD. Circ out McOH from CT. Cut 5' of CT. Install WFD CTC & Pull test to 35k - OK. Pressure test inner reel valve &CTC to 3500psi - OK. Open up well & observe Opsi WHP. IAP = 63psi. OAP = 39psi. M/U injector & stab onto well. RIH WS setting BHA #1 taking McOH FP returns to the tiger tank. SHT MWD ~ 1500' &orienter C~ 3000' with 1.6bpm/1150psi - OK. Wt check ~ 9400' - Up = 39k, Run-in = 20k. RIH & lightly tag CIBP @ 9463'. P/U to up wt & correct CTD to 9940' (CTMD). PUH to 9170' for MWD tie-in. Log down from 9170' to 9213' @ 1.6bpm/1150psi & tie-into 04-Jun-03 Sperry-Sun MWD Log (which is -4' off depth from Geology PDC log). Add 3.5' to CTD. RBIH & position BOWS @ 9433.15' with TOWS @ 9420' & 4-1/2" Lnr collars ~ 9411' & 9452' (from 21-Apr-06 PDS MGR/CCL). Check TF - ~ 145R. Survey C~3 9397.91' gives 81.74degs inclination. Orient TF 1 click to 156R. Orient TF 1 more click to 161 R. Orient TF 1 more click to 173R. Circ C~ 3.05/3.05bpm & 4350psi for 5mins to arm the FAIV. Drop pump to Obpm. Wait 5mins. Bring on pump to 1.6bpm, pressure up & shear off W S @ 1600psi (- lower shear pressure is due to different WFD setting adapter). Continue pumping & observe TF of 178R. Set down 10k & WS held. Paint EOP flag @ 9300'. POOH with WS setting BHA#1 circ 0.9bpm/200psi. Paint EOP flag C2 9300'. Meanwhile bleed down the IAP from 1200psi to 300psi & OAP from 760psi to 55psi. OOH. PJSM. S/B injector. L/D WS setting BHA #1. M/U window milling BHA #2 with a 3.80" WFD DWM, 3.80" HC DSR, WFD PDM, MHA & 2 jts of PH6 tbg (OAL - 83.79'). M/U injector. RIH window milling BHA #2. Wt check C~3 8800' = Up - 34k, Run-in - 19k. Tag XN ~ 8911'. P/U to up wt & correct CTD (-19') to "Schematic" depth of 8892'. Establish freespin Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Legal Well Name: C-16 Common Well Name: C-16 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~ From - To I Hours Task Code 5/13/2006 14:40 - 16:15 1.58 STWHIP P 16:15 - 17:40 1.42 STWHIP P 17:40 - 18:00 18:00 - 00:00 5/14/2006 100:00 - 00:30 00:30 - 03:00 03:00 - 04:00 04:00 - 06:00 06:00 - 06:30 06:30 - 07:20 0.331 STWHIPI P 6.00 STWHIP P 0.50 STWHIP P 2.50 STWHIP P 1.00 STWHIP P 2.00 STWHIP P 0.50 STWHIP P 0.83 STWHIP P 07:20 - 08:45 1.42 STWHIP P 08:45 - 09:15 0.50 STWHIP P 09:15 - 09:30 0.25 DRILL P 09:30 - 10:15 0.75 DRILL P 10:15 - 10:30 0.25 DRILL P 10:30 - 11:00 0.50 DRILL P Page 2 of 10 Spud Date: 5/11/1980 Start: 5/10/2006 End: 5/21 /2006 Rig Release: 5/21 /2006 Rig Number: i NPT j Phase Description of Operations WEXIT 2.65bpm & 1300psi. WEXIT Ease into milling from 8890' & mill thru XN nipple with 2.65bpm & 1550psi. Make few passes with & without pumping to ensure there are no restrictions/overpulls. Got back some gas to surface (suspect from behind tail pipe). WEXIT Continue RIH BHA #2. Wt check @ 9350' - Up wt = 34k & Run-in wt = 19k. See EOP flag right on depth. Lightly tag WS/Inr pinch pt @ 9420.4'. PUH 15' & establish free spin @ 2.7bpm/1300psi. RBIH & ease in till motor work @ 9419.5. Flag pipe & start milling window with 1.5ppb bio-KCL fluid. WEXIT Mill window f/ 9420' - 9425' with 2.6/2.6bpm, 1490/1860psi, <1 k WOB & lfph ave ROP, Drill formation f/ 9425' to 9430' with 2.62/2.62bpm, 1350/1769psi, <1k WOB & 9fph ave ROP WEXIT Drill formation f/ 9425' to 9435' with 2.62/2.62bpm, 1350/1769psi, <1k WOB & 9fph ave ROP WEXIT Dress off Window, Work thru window several times with pumps, seeing mtr work of 40 psi at top of window 9421', setting down with pumps off at 9421' WEXIT Attempted to slide thru window w/o pumps, setting down at 9421', unable to pass thru window with pumps, mtr work increased to 100 - 150psi, stalled once, worked thru window with pumps, mtr work of 150 psi f/ 9421' to 9423', washed to 9435', no problems, still seeing 40 psi mtr work ream and backreaming thru window at 9421' WEXIT Work thru window several times with pumps, seeing mtr work of 30-40 psi at top of window 9421', setting down with pumps off at 9421', roll pumps mill fall off, no problems RIH to btm once pasted trouble spot, consult with town engineer and wfd representative, displacing well to Flo-Pro Mud WEXIT Passing thru window without the pumps sporadically continue to dress off window, displacing well to Flo-Pro Mud WEXIT Backream/dress window/rat hole 3x & drift 2x. Window is clean on backreaming. On 1st down-drift, stacked wt @ +/-9423', roll pumps & pop into OH. On 2nd down-drift, RIH a bit faster @ 15fpm & run thru clean into OH. Suspect W/S is stacking the mill because it was set in a build curve and/or because it has some grind-off area on the ramp: Decide to POOH to P/U drilling BHA. Tentative window depths are: TOWS/TOW = 9420', BOW = 9425', RA PIP Tag = 9428.9'. WEXIT Paint EOP flag @ 9300' & POOH window milling BHA #2, while displacing well to mud. WEXIT OOH. PJSM. S/B injector. UD BHA #2 & inspect mills. Window mill & string mill gauge 3.79" go / 3.78" no-go. Wear on window mill face indicate mill center crossed the liner wall. PROD1 Held pre-spud safety meeting. Reviewed well plan, potential hazards, drilling BHA M/U procedures & HA/HM for cutting 150' of CT. PROD1 M/U drilling BHA #3 with 1.2deg X-treme motor, MWD/GR, orienter & used Hycalog 3-3/4" x 4-1/4" DS3611 M bicenter bit #2. Scribe tools & suspend in slips. PROD1 R/U hydraulic cutter & cut 150' of CT for fatigue management. Have 16350' of CT left on reel. PROD1 Rehead & M/U SLB CTC. Pull test to 35k & pressure test to Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Page 3 of 10 Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: Date ~ Prom - To ~ Hours ~ Task ~ Code ~ NPT ~ Phase ~ Description of Operations 5/14/2006 10:30 - 11:00 0.50 DRILL P PROD1 3500psi - OK. M/U injector to BHA. 11:00 - 12:40 1.67 DRILL P PROD1 RIH drilling BHA #3. SHT MWD @ 500' & orienter Q 3000' 12:40 - 13:20 0.67 DRILL P 13:20 -.13:30 0.17 DRILL P 13:30 - 13:35 0.08 DRILL P 13:35 - 14:30 0.92 DRILL P 14:30 - 14:40 0.17 DRILL P 14:40 - 15:00 0.33 DRILL P 15:00 - 18:15 3.25 DRILL P 18:15 - 18:20 0.08 DRILL P 18:20 - 18:30 0.17 DRILL P 18:30 - 18:35 0.08 DRILL P 18:35 - 18:40 0.08 DRILL P 18:40 - 18:55 0.25 DRILL P 18:55 - 21:00 2.08 DRILL P 21:00 - 22:30 1.50 DRILL P 22:30 - 23:00 0.50 DRILL P 23:00 - 23:15 0.25 DRILL P 23:15 - 00:00 5/15/2006 00:00 - 03:30 03:30 - 05:05 05:05 - 06:45 06:45 - 07:00 07:00 - 08:30 0.75 DRILL P 3.50 DRILL P 1.58 DRILL N 1.67 DRILL N 0.25 DRILL N 1.50 DRILL N 08:30 - 09:30 09:30 - 11:15 11:15 - 11:40 1.001 DRILL I N PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB IPRODI 1.751 DRILL I N I DPRB I PROD1 0.421 DRILL N I DPRB PROD1 OK. RIH to 9160'. Log down from 9160' to 9213' & tie-into Geology PDC log. Subtract 15' from CTD. RIH clean thru window with pumps down @ LS TF. Tag btm without pumps @ 9441'. Bring on pumps & establish freespin C~2 2.65bpm/3050psi. TF =179L. Up wt = 30k, Run-in wt = 18k. PVT = 281 bbls. IAP = 680psi, OAP = 700psi. Orient TF 2 clicks to 155L. Begin drilling drop/build/turn section with 150E TF, 2.65/2.65bpm, 3050/3450psi, 3k WOB & 45fph ave ROP. Drill to 9469'. Saw RA PIP tag @ 9434'. Correct window depths as follows: TOWS/TOW = 9425' & BOW = 9430'. Drill to 9480' with 120E TF, 2.65/2.65bpm, 3050/3450psi, 3k WOB & 65fph ave ROP. Orient TF to 70L. Orient & drill to 9690' with 80-110L TF, 2.65/2.65bpm, 3050/3450psi, 3k WOB & 95fph ave ROP. Meanwhile bleed down the IAP from 1000psi to 310psi & OAP from 1000psi to 320psi. Orient TF to 40L. Drill to 9708' with 50L TF, 2.65/2.65bpm, 3050/3450psi, 3k WOB & 135fph ave ROP. Orient TF to 15L. Drill to 9735' with 25L TF, 2.65/2.65bpm, 3050/3350psi, 3k WOB & 175fph ave ROP. Orient TF to90R. Drill to 9851' with 80R TF, 2.40/2.40bpm, 2800/3150psi, 3k WOB & 110fph ave ROP. POH to BHA POH w/ BHA, LD MWD-GR, mtr, and bit PJSM on PU and handling steerable Assy, discussed overlifting, new personnel to operations and good communication MU Xbow tools, bit, MWD, Mtr, MHA and CTC Stab Inj, RIH w/ Xbow steerable assy, tagged up at 9442' Made several attempts to work passed window without pumps, PU above window to 9375' 3X, performed 3 downlinks to Xbow tool to adjust pads in different positions, after each downlink, shut down pumps, attempted to RIH, unable to work past window POH to BHA #4 Held PJSM for UD SLB X-bow BHA. S/B injector. UD BHA#4. Check bit -had 2 chipped cutters on the face, grade 2/0/1 (must have tagged up on TOWS). M/U drilling BHA #5 with 1.2degs X-treme motor, MWD/GR/RES, orienter & rerun Hycalog 3-3/4" RSX508S61 PDC bit #4. Scribe tools & initialize resistivity tool. M/U injector. RIH drilling BHA #5. SHT MWD @ 500' & orienter ~ 3000' OK. Wt check ~ 9400' = Up - 38k, Run-in - 19k. Check TF - @ 45L. S/D pumps &RIH dry. Tag TOWS @ 9443'. Bring up pumps & confirm TF C~ 45L. Orient TF around to Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 5/15/2006 11:15 - 11:40 11:40 - 12:00 C-16 C-16 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Hours Task Code j NPT l- Start: 5/10/2006 Rig Release: 5/21/2006 Rig Number: Page 4 of 10 Spud Date: 5/11/1980 End: 5/21 /2006 Phase Description of Operations 0.42 DRILL N DPRB PROD1 0.33 DRILL P PROD1 12:00 - 14:40 I 2.671 DRILL I P I I PROD1 14:40 - 15:00 0.33 DRILL P PROD1 15:00 - 15:15 0.25 DRILL P PROD1 15:15 - 15:50 0.58 DRILL P PROD1 15:50 - 16:05 0.25 DRILL P PROD1 16:05 - 16:10 0.08 DRILL P PROD1 16:10 - 16:30 0.33 DRILL P PROD1 16:30 - 17:10 0.67 DRILL P PROD1 17:10 - 17:30 0.33 DRILL P PROD1 17:30 - 18:25 0.92 DRILL P PROD1 18:25 - 19:05 0.67 DRILL P PROD1 19:05 - 19:45 0.67 DRILL P PROD1 19:40 - 23:05 3.42 DRILL P PROD1 23:05 - 00:00 0.92 DRILL P PROD1 5/16/2006 00:00 - 01:30 1.50 DRILL P PROD1 01:30 - 01:50 0.33 DRILL P PROD1 01:50 - 02:30 0.67 DRILL P PROD1 02:30 - 02:40 0.17 DRILL P PROD1 02:40 - 03:00 0.33 DRILL P PROD1 03:00 - 03:20 0.33 DRILL P PROD1 03:20 - 04:10 0.83 DRILL P PROD1 04:10 - 04:30 0.33 DRILL P PROD1 04:30 - 05:05 0.58 DRILL P PROD1 05:05 - 05:55 0.83 DRILL P PROD1 05:55 - 06:30 0.58 DRILL P PROD1 06:30 - 06:50 0.33 DRILL P PRODi 06:50 - 08:00 I 1.171 DRILL I P I I PROD1 08:00 - 08:10 0.17 DRILL P PROD1 08:10 - 09:15 1.08 DRILL P PROD1 09:15 - 09:30 0.25 DRILL P PROD1 09:30 - 10:45 1.25 DRILL P PROD1 165R. RIH with pumps down @ 165R TF & 15fpm. Saw slight wt bobble @ 9443' & bounce thru window into OH. Tag btm without pumps ~ 9866'. Correct CTD to 9851'. Establish freespin @ 2.65bpm/3100psi. TF = 145R. Up wt = 30k, Run-in wt = 18k. PVT = 270bb1s. IAP = 55psi, OAP = 220psi. MAD pass real time resistivity data from 9851' to 9650' 75fph. MAD pass C~3 100fpm to window. Log up & tie-into RA Pip tag with 0' correction. RBIH to btm tagged @ 9851'. Orient & drill to 9874' with 65R TF, 2.65/2.65bpm, 3100/3850psi, 3k WOB & 135fph ave ROP. Orient TF around to 40R. Drill to 9890' with 65R TF, 2.65/2.65bpm, 3100/3650psi, 3k WOB & 135fph ave ROP. Orient TF around to 100R. Drill to 9930' with 95-135R TF, 2.65/2.65bpm, 3100/3450psi, 3k WOB & 135fph ave ROP. Orient TF around to 60R. Drill to 10000' with 65R TF, 2.65/2.65bpm, 3100/3450psi, 5k WOB & 155fph ave ROP. Orient & drill to 10062' with 100R TF, 2.65/2.65bpm, 3250/3850psi, 4k WOB & 90fph ave ROP. Wiper trip to window, RIH back to btm, no problems Orient TF to 106 R Drill to 10200' with 86R TF, 2.61/2.61bpm, 3512/3867psi, FS 3122 psi, 2k WOB & 90fph avg ROP. Wiper trip to window, RIH back to btm, no problems Orient and Drill to 10254' w/ 80R TF, 2.65 bpm, 3585 psi Orient TF around to 50 R Drld w/ 35R TF, 2.55 bpm, 3500 psi Orient TF to 70 R Drld w! 65R TF, 2.65 bpm, 3550 psi Orient TF to 70 L Drld w/ 65L TF, 2.50 bpm, 3430 psi Orient TF to 140 L Drld w/ 151 L TF, 2.60 bpm, 3525 psi Wiper Trip and Tie-in Pass, +7 correction RIH & set down @ 10194'. P/U & run thru. Tag btm @ 10357'. Orient & drill to 10376' with 110E TF, 2.65/2.65bpm, 3350/3650psi, 2k WOB & 90fph ave ROP. Bumped into the 14N shale @ 10310'. Will drill down to exit from the 14N. Orient & drill to 10440' with 140E TF, 2.65/2.65bpm, 3350/3650psi, 12k WOB & 50fph ave ROP. Exit the 14N shale C~ +/-10420' Orient TF around to 70L. Drill to 10500' with 35-15L-30R TF, 2.65/2.65bpm, 3350/3750psi, 4k WOB & 90fph ave ROP. Meanwhile swap well to new 8.6ppg flopro mud. TF is rolling right. Drill to 10520' with 15R TF, 2.65/2.65bpm, 3000/3450psi, 3k WOB & 80fph ave ROP. Wiper trip clean to window. RBIH & set down in shale @ 10133'. P/U & run thru to btm. Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Page 5 of 10 Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: Date ~ From - To Hours Task ~ Code NPT ~ Phase ~ Description of Operations 1-_ _~ _ !_ __ 5/16/2006 10:45 - 10:55 0.17 DRILL P PROD1 Orient TF around to 70L. 10:55 - 12:20 1.42 DRILL P PROD1 Drill to 10575' with 15R TF, 2.65/2.65bpm, 3000/3150psi, 3k WOB & 90fph ave ROP. 12:20 - 14:20 2.00 DRILL P PROD1 Drilled to 10625', Orient to 90L, Drilled to 10,700'. 14:20 - 15:45 1.42 DRILL P PROD1 Wiper trip from 10700', up wt. 33000 lbs. 15:45 - 16:00 0.25 DRILL P PROD1 Orient TF to 90R. 16:00 - 17:00 1.00 DRILL P PROD1 Drilling Z1 B Lateral, 2850-3400 psi, 2.7 bpm, 90R, Drilled to 10,766'. 17:00 - 17:15 0.25 DRILL P PROD1 Orient TF to 30R. 17:15 - 19:00 1.75 DRILL P PROD1 Drilling Z1 B Lateral, 2850-3400 psi, 2.7 bpm, 30R, Drilled to 10,857'. 19:00 - 20:00 1.00 DRILL P PROD1 Wiper to window 9490'. 20:00 - 20:20 0.33 DRILL P PRODi Tie-in correction = +14'. 20:20 - 21:40 1.33 DRILL P PROD1 Wiper back to TD Ratty at 10190. Set down at 10357 (14N shale) got to 10838 No Go. Make 100 short wiper. ratty form 10838 to 10870'. 21:40 - 22:15 0.58 DRILL P PROD1 Orient to 127R. Hole remains ratty 10840 to TD 22:15 - 23:20 1.08 DRILL P PROD1 Drill 2.7/ 2.7 bpm at 3030 psi. Drill to 10955. Bluffing shales in returns possible 14N. 23:20 - 23:30 0.17 DRILL P PROD1 Orient to 104R. 23:30 - 00:00 0.50 DRILL P PROD1 Drill 2.62/ 2.61 bpm C~ 3160 psi FS = 2900 psi Surface wt 5K, ROP 150. Drilled to 11,000'. 5/17/2006 00:00 - 01:45 1.75 DRILL P PROD1 Wiper to window. Large amounts of splintered shale in returns continuously on trip .Ratty below 10780. Set down at 10813. Ratty to 10,870'. 01:45 - 04:20 2.58 DRILL P PROD1 Directionally drill 2.6/2.6 at 3050 psi, Surface wt 5K, ROP90,TF 89R.Currently drilling in Z-2A. Will maintain 88 degrees. 04:20 - 06:30 2.17 DRILL P PROD1 Wiper to window, Ratty 10500 - 10600. 10873-11,100'. Ream down thru 14N shales in this area. 38K up wt. 06:30 - 08:30 2.00 DRILL P PROD1 Not able to get wt to bit on bottom, backream 14N shales with 10-20K overpulls from 10900-10700'. Back ream up to window again. Unloading caving shales from reaming. 08:30 - 09:30 .1.00 DRILL P PROD1 Pull thru window clean and backream up to 9000'. Circ. 30 bbl very high vis FloPro pill to bit and chase out from 9400'. 09:30 - 11:30 2.00 DRILL P PROD1 POH to lay out RES tool. Circ. at full rate all the way out of hole. Had extra shale on shaker from HV sweep. Had extra shale when BHA reached surface. 11:30 - 11:45 0.25 DRILL P PROD1 SAFETY MEETING. Reviewed procedure, hazards and mitigation for laying out BHA and Testing new design Little Jerk torque tool. 11:45 - 13:45 2.00 DRILL P PROD1 UO BHA. Download RES data. UO RES tool. M/U used HYC DSX49H Bit #5. C/O MWD probe, check orienter, C/O MHA. OAL = 66.94'. Hycalog Bit #4 gradded at [ 8,2,1]. Bit was rung out in middle row, Bit does not have back reamers. 13:45 - 15:45 2.00 DRILL P PROD1 RIH with lateral MWD BHA #6 with 1.2 deg motor. SHT tools and orienter OK. RIH. Ran thru window clean with 138R TF. RIH to 9485'. 15:45 - 16:15 0.50 DRILL P PROD1 Log GR tie-in at RA tag at 9,434'. -15' CTD. 16:15 - 18:30 2.25 DRILL P PROD1 RIH, swap well to 9.6 PPB new FloPro with 4% LT and 14 PPB KlayGard, while RIH. Clean hole down to 10770'. Ream shales with new FloPro at 10 FPM. Sat down at 10,810', Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Legal Well Name: C-16 Common Well Name: C-16 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~ From - To Hours ~ Task Code --_ - - , 5/17/2006 16:15 - 18:30 2.25 ~ DRILL P 18:30 - 18:45 0.25 DRILL P 18:45 - 19:00 0.25 DRILL P 19:00 - 20:45 1.75 DRILL P 20:45 - 00:00 I 3.251 DRILL I P 5/18/2006 00:00 - 00:30 0.50 DRILL P 00:30 - 02:00 1.50 DRILL P 02:00 - 02:30 I 0.501 DRILL I P I I PROD1 02:30 - 03:00 0.50 DRILL N DPRB PROD1 03:00 - 04:45 1.75 DRILL P PROD1 04:45 - 05:15 0.50 DRILL P PROD1 05:15 - 06:00 0.75 DRILL P PROD1 06:00 - 08:30 I 2.501 DRILL I P I I PROD1 08:30 - 10:30 I 2.001 DRILL I P I I PRODi 10:30 - 11:15 I 0.751 DRILL I P I I PRODi 11:15 - 14:15 I 3.001 DRILL I P I I PROD1 14:15 - 16:15 I 2.001 DRILL I P I I PROD1 16:15 - 17:00 I 0.751 DRILL I P I I PROD1 Start: 5/10/2006 Rig Release: 5/21/2006 Rig Number: Page 6 of 10 Spud Date: 5/11 /1980 End: 5/21 /2006 Description of Operations 10830', Backream up to 10500'. RIH and ream down thru 14N shales. RIH to 11155. Drill 2.56 /2.56 bpm at 3550 psi. Drill to 11185' Orient to 87R. Drill 2.54 / 2.54 bpm @ 3560 psi. FS + 3200 psi. Surface wt 5K, ROP 90, drill to 11199. ROP change. GR spike. Continue drilling to 11300' Wiper over pulls and motor work ing in the 14N shale 10880 to 10690.10-30K over normal. Over pull 10400 thru 10350 pulled 30K over and stalled motor@ 10358. Extensive amount of scale across screens 3/16 "diameter .Trip back in no set down but did see negative surface weights in 14N shale. Set down at 11196'. Orient 40R Orient 45R Drill 2.5/2.5 bpm @ 3460 psi, surface wt 0, ROP 100+, 104R. drill to 11450 Wiper to window. 10802 over pull and kick out at 76K. Stuck mechanical Work pipe free. Called TD at 11,450' Wiper to window. Frequent over pull throughout well bore. Large shale pieces periodically over shaker 0.5" diameter. POH to 9480'. Tie-in correction = +21.5'. RIH set down 10390 lost ground to 10349 . Set down 10370, 10388, 10,450, RIH to 10,600' OK. Wiper to 9000' to chase out shales in hole. Overpull at 10460 and 10000, Circ. 30 bbl very high vis pill to chase out cuttings. RIH to 10410', stack full wt, backream with overpulls to 60K. Some caving shale up with HV sweep, RIH and stack wt at 10440'. Ream shales. RIH clean to 10730', Ream down to 10810', ream thru shale in 1/2 hour. RIH to 11200' below 14N shale and pump 30 bbl high vis FloPro sweep. RIH while circ sweep. 2.2 bpm, 3050 psi. Tag Finale TD at 11,465'. Circ. hole while mixing 20 bbl, high wt, 12.5 PPG FloPro pill to clean openhole. 37K up wt, 8K down wt, off bottom. Did not see any extra cuttings at surface from sweep. Circ. 20 bbl, 12.5 ppg, high Wt FloPro pill to clean openhole. Pull up hole from TD of 11,465', 10 FPM, 2.8 bpm, 3400 psi. RIH at 10 fpm while circ pill in openhole. Backream up slow at 10 fpm, overpull to 60K at 10,895, 10870, 10845, and 10800' in lower 14N shale. Not to bad. Pull clean up to 10450 and 10370', 10K overpull, had 20K overpull at 10360'. Backreamed up thru it OK. Pull clean up to window. Puil clean thru window. Up wt = 32K. POH to run liner. Flag coil at 9200' EOP and 7200' EOP. POH, circ at 2.8 bpm, full returns. Saw extra shale on shaker when we pulled the BHA up to 500'. Pulled slow to surface until shale quit, estimated 1 bbl of shale cuttings, there is a total of 10 bbls of shale in the cuttings tank. UO MWD BHA. NPT ' Phase _- PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Page 7 of 10 Operations Summary Report Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: Date From - To Hours ; Task Code ~ NPT Phase Description of Operations 5/18/2006 17:00 - 18:45 1.75 CASE P RUNPRD Cut off SWS CTC and 25' of coil. M/U BOT CTC. Pull /Press test. Pump dart. 2.5 bpm, 1900 psi. Dart on seat at 65.8 bbl theoretical 66.8 bbls. 18:45 - 19:00 0.25 CASE P RUNPRD PJSM for picking up liner. Pinchpoints associated with the side door elevators. Over head loads, Falling ice from derrick. Watch out for your fellow workers. Watch for trapped item along side of the catwalk while adjusting the height of catwalk. 19:00 - 22:00 3.00 CASE P RUNPRD Pu 2-7/8" x 3-3/16 liner. 22:00 - 00:00 2.00 CASE P RUNPRD RIH. to flag at 7200' EOP. Up Wt 38K. DN Wt 16K. RIH thru window No problem. Continue to RIH Set down at 10508,10570 10603 106585, 10767. Circulate at 1.4 bpm at 2000 psi. 5/19/2006 00:00 - 06:15 6.25 CASE P RUNPRD Pop thru. Circulate at .16 bpm @ 850 psi. RIH. Set down at 10800, 10817, Cirulate at 1.3 bpm at 1760 psi.PU set down 10824' Circulate .17 bpm PU. No Go pat 10825, Circulate at 1.5 bpm C~ 1860 psi,00:20 hrs, POP free 00:30 Set down at 10832, Set down 10856, -12K DN WT. Pu Set Dn 10858. Pu Set Dn 10859, PU Set DN 10860, Set Dn 10864, Circulate 1.5 bpm @ 1835 psi, Up Set Dn at 10880, Set DN 10910,10920,Circulate 1.5 bpm, set Down 11000,11044, Circulate 1.4 bpm 1900 psi, PU, Set Dn 11065, Pu, Set Dn 11061, 11104,11152, Circulate 1,5 bpm,1900 psi, PU Set Dn 11151,11174,11198,11208, 11230, Circulate 1.5 bpm, Pu, Set do 11246, 11262, 11279, Circulate, Pu set do at 11304,11316, Circulate, 1.5 bpm, Set down 11342, Circulate,Set down 11362, Circulate Set down 11374, 11378, Circulate 1.5 bpm, set down 11405,11420,11437, Circulate 1.5 bpm, Work liner to 11473'. Liner is landed at TD of 11,465'. 06:15 - 07:15 1.00 CASE P RUNPRD Insert 5/8" AL ball. Displace with FloPro. 2.5 bpm, 2900 psi. Slow pump at 40 bbls to 0.8 bpm. Ball on seat at 56.8 bbls. Released at 3800 psi. Pick up and prove coil was free from liner. 07:15 - 10:00 2.75 CEMT P RUNPRD Circ. well to 9.5 PPG KCL water, recover used FloPro and return to MI. 2.6 bpm, 2700 psi, full returns. 10:00 - 11:30 1.50 CEMT N WAIT RUNPRD Circ. while waiting for SWS cementers. SWS was not able to get mix water in truck until 0700 hrs, the equipment was on other jobs. Wait on UCA cement testing before pumping cement. 11:30 - 12:15 0.75 CEMT P RUNPRD Rig up cementing equipment and hardline. 12:15 - 12:30 0.25 CEMT P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement job with SWS and Nordic personnel. 12:30 - 12:45 0.25 CEMT P RUNPRD Pressure test cementing line and equipment with 3800 psi. UCA indicated good cement with thickening time of 3hrs, 54 min. 12:45 - 13:25 0.67 CEMT P RUNPRD Stage 30 bbls, 15.8 ppg, Class G cement, 15 bbls, 2.4 bpm, 2480 psi, 15.9 ppg, full returns. 30 bbls, 2.4 bpm, 2500 psi, 15.9 ppg, full returns. Stop cement pump. Isolate coil. Clear cement line. Pump Biozan water to reel. Insert BOT dart. Zero micro in and out. 13:25 - 14:15 0.83 CEMT P RUNPRD Stage 30 bbls, 2# Biozan behind dart, 2.6 bpm, 2770 psi. Printetl: 5/22/2006 11:58:05 AM BP EXPLORATION Page 8 of 10 Operations Summary Report Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: Date ~ From - To Hours ~ Task ~ Code ' NPT Phase Description of Operations 5/19/2006 13:25 - 14:15 0.83 CEMT P RUNPRD 10 bbl displ, 2.6 bpm, 2400 psi, full returns 20 bbl displ, 2.5 bpm, 1700 psi, full returns. 28 bbl displ, 2.5 bpm, 1000 psi, full returns, swap to 9.5 # KCL water 40 bbl displ, 2.5 bpm, 750 psi, full returns, lead cmt at top of liner 48.3 bbl displ, 2.5 bpm, 1400 psi, cement at shoe, zero return micro 58 bbl displ, shales starting to pack off, slow pump to 1.5 bpm, 2260 psi, 50% returns 60 bbl displ, 1.5 bpm, 2800 psi, 0.2 bpm returns, 10.8 bbls around shoe. 66.3 bbls, dart on LW P, sheared plug at 4400 psi. Displace LW P, liner cap = 12.3 bbls. 70 bbl displ, 1.9 bpm, 3000 psi, no returns, total returns = 11.5 bbls. 74 bbl displ, 1.0 bpm, 2400 psi, no returns, 77 bbl displ, 1.0 bpm, 2300 psi, no returns, 77.9 bbl, bumped LW P, held 2800 psi, steady pressure. 11.5 bbls total returns. Bleed press, check floats, OK. Deployment sleeve [3.70" OD] is fully packed off with shale / cmt inside 4-1l2" Liner [3.96" ID] Press up 500 psi, pick up and sting out of liner top clean, regain circulation. 14:15 - 16:00 1.75 CEMT P RUNPRD POH, pump 0.6 bpm, with 0.1 bpm returns. 16:00 - 16:45 0.75 CEMT P RUNPRD UO BOT liner running tools. 16:45 - 17:00 0.25 EVAL P LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for M/U SWS Memory CNUGR logging tools and motor and mill. 17:00 - 18:45 1.75 EVAL P LOW ER1 M/U 2.30" Diamond PB Mill, 2-1/8" motor, 2 jts CSH, SWS carrier, BOT Circ sub, BOT Hyd Disc, 68 jts CSH and MHA. OAL = 2209.1'. 18:45 - 20:00 1.25 EVAL P LOWERI RIH with logging tool to 8800'. 20:00 - 21:40 1.67 EVAL P LOWERI Log at 30 ft/min from 8800'. to TD 11431. Finish spotting pert pill. 21:40 - 22:30 0.83 EVAL P LOWERI Log up at 60 fpm. to 8800'. 22:30 - 23:30 1.00 EVAL P LOWERI POH to CSH. 23:30 - 00:00 0.50 EVAL P LOW ER1 Stand back 34 stands of 5/20/2006 00:00 - 01:30 1.50 EVAL P LOWERI Continue to standback 34 stands of 1-1/4" CS Hydril. 01:30 - 01:45 0.25 EVAL P LOW ER1 PJSM for LD memory tool and RA source. 01:45 - 02:00 0.25 EVAL P LOW ER1 LD memory logging tools. 02:00 - 03:00 1.00 EVAL P LOWERI Flush stack with swizzelstick. 03:00 - 03:45 0.75 EVAL P LOWERI Test Liner Lap to 2000 psi. NO Test. 03:45 - 04:45 1.00 EVAL P LOWERI Function test BOP. PBTD from MCNUGR = 11,420'. Will perf off of this depth. 04:45 - 05:00 0.25 PERFO P LOW ER1 PJSM for PU perf guns. 05:00 - 06:15 1.25 PERFO P LOW ER1 PU first set of perf guns. 06:15 - 06:30 0.25 PERFO P LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for running SWS perf guns. 06:30 - 09:00 2.50 PERFO P LOWERI Continue running SWS 2" perf guns. M/U BOT Hyd Disc, 19 stds CSH and MHA. OAL = 2,148.13'. Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Operations Summary Report Page 9 of 10 Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: i Date ;From - To Hours , Task j Code NPT Phase Description of Operations 5/20/2006 ~ 09:00 - 11:00 ~ 2.00 PERFO P 11:00 - 12:40 ~ 1.67 5/21 /2006 12:40 - 14:45 I 2.081 P 14:45 - 15:15 0.50 P 15:15 - 15:30 0.25 P 15:30 - 17:45 2.25 P 17:45 - 18:30 0.75 P 18:30 - 18:45 0.25 P 18:45 - 19:30 0.75 P 19:30 - 20:15 0.75 P 20:15 - 21:45 1.50 P 21:45 - 22:40 0.92 P 22:40 - 00:00 00:00 - 01:15 01:15 - 01:30 01:30 - 02:45 02:45 - 04:00 04:00 - 04:30 04:30 - 06:30 06:30 - 08:30 1.33 PERF~ 1.25 PERF~ 0.25 PERF~ 1.25 PERF~ 1.25 PERFi 0.50 CASE 2.00 CASE 2.00 CASE 08:30 - 09:30 1.001 CASE P P P P P P P P P P P P LOWERI RIH, pump min. rate at 0.2 bpm, 70 psi. RIH and tag PBTD at 11,425' and correct to 11,420' PBTD from MCNUGR log. [-5']. LOWERI Circ. 10 bbls new FloPro pert pill. Insert 1/2" AL ball and pump 5 bbls FloPro behind. Position bottom of guns at PBTD at 11,420'. Displace with KCL water at 1.8 bpm at 2360 psi. Ball on seat at 67 bbls. Pull slow and fire guns at 3100 psi. Good fire indication. No overpull. Continue POH at 40 fpm, 0.7 bpm, 37K up wt. Flag coil at 8000' EOP. CTD was tied-in with PBTD of 11,420' picking up. LOWERI POH with fired pert guns, Run #1. Flow check well at surface. Well is dead. LOWERI Stand back 19 stds of CSH. LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for laying out fired SWS pert guns. LOW ER1 Lay out fired pert guns and blanks. LOW ER1 Load pert guns into pipe shed for Gun run #2. LOW ER1 PJSM for picking up guns. Watch for pinchpoints in crumy elevators and safety pin in elevators. Also on thehandling sub fo the gunn and snap ring installation on guns. LOWERI PU 20 guns. LOWERI PU 19 stands of CSH. LOWERI RIH pumping min rate .3 bpm @ 77 psi. RIH to EOP flag at 8800 + BHA 1615 = 9615. Correction = -12'. LOWERI Circ. 10 bbls new FloPro pert pill. Insert 1/2" AL ball and pump 8 bbls FloPro behind. Position bottom of guns at PBTD at 10,020'. Displace with KCL water at 1.8 bpm at 2020 psi. Ball on seat at 65.4 bbls. Pull slow and fire guns at 2700 psi. Good fire indication. No overpull. Continue POH at 40 fpm, 0.7 bpm, 33K up wt. LOW ER1 POH to surface. LOWERI Stand back 19 stands of CSH. LOWERI PJSM for laying down perforating guns. LOWERI LD 20 perforating guns. LOW ER1 Clear floor. Load out spent guns. RUNPRD Pu liner top packer BHA. RUNPRD RIH with liner top packer. RUNPRD Stung seals in at 8382' and Set down at 9387.5' with 10K wt. Pull out to circ. Insert 5/8" AL ball. Displace ball with KCL water. Ball on seat at 58.7 bbls. RIH. Not able to sting back into deployment sleeve. Work up /down several times. Setting up at 9378'. Not able to circ due to ball on seat. Pickup and pump down backside to try and sting in. Set down several times. Well taking fluid at 0.3 bpm at 1100 psi. Reverse Circ. ball up to surface. Hear ball in reel. RUNPRD Sting into deployment sleeve while pumping down coil at 1.5 bpm. Set down 10K at 9387 ft. Seal assembly is inside PBR. Pick up to free point and pick up 1 ft above landing depth to Printed: 5/22/2006 11:58:05 AM BP EXPLORATION Page 10 of 10 Operations Summary Report Legal Well Name: C-16 Common Well Name: C-16 Spud Date: 5/11/1980 Event Name: REENTER+COMPLETE Start: 5/10/2006 End: 5/21/2006 Contractor Name: NORDIC CALISTA Rig Release: 5/21/2006 Rig Name: NORDIC 1 Rig Number: I i Date ~ From - To 'Hours Task Code NPT Phase Description of Operations __ _ _____ 5/21/2006 ~ 08:30 - 09:30 1.00 CASE RUNPRD 9379.7'. Pump ball on seat. Ball on seat at 46 bbls. Press up to 2000 psi and set packer slips. Stack wt back to 10K at 9384.3'. So slips are holding. Pickup to 33K. 09:30 - 10:15 0.75 CASE RUNPRD Pressure test Packer seals with 2000 psi on backside of coil. Chart 30 min test. Good test. 2000 psi start, 1950 psi end. Bleed off press. Press up to 3400 psi and released packer running tool. Full returns again. Pickup with no overpull. 10:15 - 11:30 1.25 CASE RUNPRD POH to 2400'. circ. 1 bpm while POH. 11:30 - 12:00 0.50 CASE RUNPRD Freeze protect 4-1/2" tubing from 2400-0 ft with 30 bbls MEOH. 12:00 - 12:45 0.75 CASE RUNPRD Lay out BOT liner running tools. Close Master and Swab valves. 12:45 - 14:00 1.25 WHSUR POST PJSM. Pump 10 bbl MEOH in coil. Displace with N2 to tiger tank. 2000 CFM for 18 min. Bleed down coil press. Clean cuttings tank with supersucker. Clean rig pits. 14:00 - 16:00 2.00 RIGD POST M/U internal CTC. Pull test. Pull coil stub to reel. Secure coil on reel with chains and crossbar. 16:00 - 20:00 4.00 RIGD POST Nipple down BOPE. UP tree cap and test. Release rig at 20:00 hrs. Printed: 5/22/2006 11:58:05 AM i ~ Halliburton Company Survey Report Company: BP Amoco Date: 6/6/2006 Time: 08`.33:35 Page: l Field; Prudhoe Bay : Co-ordinate(NE) Reference: Welf: C=16, True North Site: PB C Pad Vertical (TVD) Reference: C-16B 61.$ Well: C-16 Section (VS) Reference: Well (O.OON,O.OOE,205.OOAzi) Wellpath; C-16B Survey Calcutation,Method': Minimum Curvature Db: .Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Well: C-16 Slot Name: 16 C-16 Well Position: +N/-S 3844.48 ft Northing: 5961098.00 ft Latitude: 70 18 0.176 N +E/-W 1663.59 ft Easting : 6641 30.00 ft Longitude: 148 40 14.299 W Position Uncertainty: 0.00 ft Survey MD Incl Azim TVD Sys TVD: N/S E/W MapN MapE Toof ft deg deg ft ft ft ft ft ` ft _ 28.77 0.00 0.00 28.77 -33.00 0.00 0.00 5961098.00 664130.00 TIE LINE 102.57 0.55 182.10 102.57 40.80 -0.35 -0.01 5961097.65 664129.99 BOSS-GYRO 202.57 0.63 201.69 202.56 140.79 -1.34 -0.23 5961096.65 664129.79 BOSS-GYRO 302.57 0.78 199.10 302.56 240.79 -2.50 -0.66 5961095.49 664129.39 BOSS-GYRO 402.57 1.00 200.69 402.54 340.77 -3.96 -1.19 5961094.02 664128.89 BOSS-GYRO 502.57 1.82 193.50 502,51 440.74 -6.32 -1.87 5961091.64 664128.27 BOSS-GYRO 602.57 2.08 187.60 602.45 540.68 -9.66 -2.48 5961088.29 664127.73 BOSS-GYRO 702.57 2.20 184.00 702.39 640.62 -13.37 -2.85 5961084.57 664127.44 BOSS-GYRO 802.57 1.82 188.19 802.32 740.55 -16.86 -3.21 5961081.07 664127.15 BOSS-GYRO 902.57 1.32 202.19 902.29 840.52 -19.50 -3.88 5961078.42 664126.55 BOSS-GYRO 1002.57 1.02 203.29 1002.27 940.50 -21.38 -4.66 5961076.52 664125.80 BOSS-GYRO 1102.57 1.00 194.79 1102.25 1040.48 -23.05 -5.24 5961074.85 664125.27 BOSS-GYRO 1202.57 0.87 169.31 1202.24 1140.47 -24.63 -5.32 5961073.26 664125.22 BOSS-GYRO 1302.57 0.83 155.50 1302.23 1240.46 -26.04 -4.88 5961071.86 664125.69 BOSS-GYRO 1402.57 0.72 125.41 1402.22 1340.45 -27.06 -4.07 5961070.86 664126.53 BOSS-GYRO 1502.57 0.85 117.41 1502.21 1440.44 -27.77 -2.90 5961070.18 664127.71 BOSS-GYRO 1602.57 0.63 99.50 1602.20 1540.43 -28.20 -1.69 5961069.77 664128.92 BOSS-GYRO 1702.57 0.43 86.30 1702.20 1640.43 -28.27 -0.78 5961069.72 664129.84 BOSS-GYRO 1802.57 0.28 112.81 1802.19 1740.42 -28.34 -0.18 5961069.67 664130.44 BOSS-GYRO 1902.57 0.37 156.70 1902.19 1840.42 -28.73 0.17 5961069.28 664130.80 BOSS-GYRO 2002.57 0.57 158.70 2002.19 1940.42 -29.49 0.48 5961068.53 664131.13 BOSS-GYRO 2102.57 0.72 158.70 2102.18 2040.41 -30.54 0.89 5961067.49 664131.56 BOSS-GYRO 2202.57 0.88 148.90 2202.17 2140.40 -31.78 1.52 5961066.26 664132.21 BOSS-GYRO 2302.57 0.67 159.20 2302.16 2240.39 -32.98 2.12 5961065.07 664132.84 BOSS-GYRO 2402.57 1.22 143.11 2402.15 2340.38 -34.38 2.97 5961063.69 664133.72 BOSS-GYRO 2502.57 1.25 127.50 2502.13 2440.36 -35.90 4.47 596106221 664135.25 BOSS-GYRO 2602.57 1.40 124.81 2602.10 2540.33 -37.26 6.34 5961060.89 664137.15 BOSS-GYRO 2702.57 1.32 115.61 2702.07 2640.30 -38.45 8.38 5961059.74 664139.22 BOSS-GYRO Wellpath: C-166 Drilled From: C-16AP61 500292043802 Tie-on Depth: 9406.46 ft Current Datum: C-16B Height 61.77 ft Above System Datum: Mean Sea Level Magnetic Data: 5/15/2006 Declination: 24.53 deg Field Strength: 57606 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.77 0.00 0.00 205.00 Survey Program for Defmitive Wellpath Date: 3/9/2006 Validated: Yes Version: 3 Actual From To .Survey Toolcode Tool Name ft ft 102.57 9002.57 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 9040.00 9406.46 C-16AP61 IIFR (9040.00-9781.03 MWD+IFR+MS MWD +IFR + Multi Station 9425.00 11465.00 MWD (9425.00-11465.00) MWD MWD -Standard • Halliburton Company Survey Report Company: BP Amoco Date: 6/6/2006 Tim e: 08:33:35 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference:. ` Well: C-16, True. North Site: PB C Pad Vertical (TVD) Reference: G-16661.8 Well: G-16 Section (VS) Reference: ' Well (O.OON,O:OOE,205.OOAzi) Wellpathd C-166 Survey Calculatlon Metbod: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD ft deg deg ft ft 2802.57 1.50 40.70 2802.05 2740.28 2902.57 4.97 44.79 2901.87 2840.10 3002.57 6.97 23.60 3001.34 2939.57 3102.57 7.73 4.80 3100.53 3038.76 3202.57 9.00 16.50 3199.47 3137.70 3302.57 13.63 25.00 3297.51 3235.74 3402.57 16.63 34.50 3394.05 3332.28 3502.57 18.23 36.90 3489.45 3427.68 3602.57 19.63 36.40 3584.04 3522.27 3702.57 21.47 36.70 3677.67 3615.90 3802.57 23.58 36.90 3770.04 3708.27 3902.57 25.47 37.90 3861.01 3799.24 4002.57 26.78 38.00 3950.80 3889.03 4102.57 29.18 38.00 4039.10 3977.33 4202.57 31.53 37.90 4125.39 4063.62 4302.57 33.50 37.70 4209.71 4147.94 4402.57 34.42 38.00 4292.65 4230.88 4502.57 33.57 38.00 4375.56 4313.79 4602.57 32.42 38.70 4459.43 4397.66 4702.57 31.30 40.00 4544.36 4482.59 4802.57 30.57 43.00 4630.14 4568.37 4902.57 29.88 45.50 4716.55 4654.78 5002.57 29.22 47.90 4803.54 4741.77 5102.57 29.75 51.40 4890.60 4828.83 5202.57 31.08 54.40 4976.84 4915.07 5302.57 28.38 56.40 5063.67 5001.90 5402.57 26.88 58.70 5152.27 5090.50 5502.57 26.63 60.90 5241.56 5179.79 5552.57 23.87 58.90 5286.78 5225.01 5602.57 21.00 59.59 5332.99 5271.22 5652.57 19.22 58.29 5379.94 5318.17 5702.57 19.18 58.70 5427.16 5365.39 5802.57 18.37 59.29 5521.84 5460.07 5902.57 16.07 63.20 5617.36 5555.59 6002.57 14.65 63.50 5713.78 5652.01 6102.57 12.18 63.90 5811.04 5749.27 6202.57 10.65 63.40 5909.06 5847.29 6302.57 9.53 63.29 6007.52 5945.75 6402.57 8.85 64.80 6106.23 6044.46 6502.57 7.78 65.90 6205.18 6143.41 6602.57 6.72 65.69 6304.38 6242.61 6702.57 5.87 67.00 6403.77 6342.00 6802.57 5.00 67.90 6503.32 6441.55 6902.57 3.83 70.00 6603.03 6541.26 7002.57 3.32 64.90 6702.83 6641.06 7102.57 2.45 58.59 6802.70 6740.93 7202.57 1.67 46.79 6902.64 6840.87 7302.57 1.20 61.20 7002.61 6940.84 7402.57 0.73 39.70 7102.59 7040.82 7502.57 0.30 40.50 7202.59 7140.82 7602.57 0.22 293.71 7302.59 7240.82 7702.57 0.42 281.50 7402.59 7340.82 N/S E/W MapN ft ft ft -37.96 10.27 5961060.28 -33.89 14.18 5961064.43 -25.26 19.66 5961073.18 -12.99 22.66 5961085.51 1.21 25.44 5961099.77 19.40 32.65 5961118.11 41.88 45.74 5961140.87 66.18 63.23 5961165.54 92.21 82.59 5961191.99 120.41 103.50 5961220.63 151.08 126.45 5961251.79 184.04 151.67 5961285.30 218.76 178.75 5961320.60 255.73 207.63 5961358.19 295.58 238.71 5961398.70 338.05 271.65 5961441.88 382.16 305.92 5961486.72 426.22 340.35 5961531.52 468.93 374.13 5961574.95 509.75 407.59 5961616.49 548.25 441.63 5961655.73 584.31 476.74 5961692.54 618.13 512.62 5961727.14 649.98 550.12 5961759.79 680.48 590.51 5961791.17 708.67 631.30 5961820.24 733.57 670.41 5961845.98 756.21 709.31 5961869.47 766.89 727.77 5961880.55 776.65 744.16 5961890.67 785.51 758.89 5961899.85 794.11 772.91 5961908.74 810.69 800.49 5961925.92 824.98 826.40 5961940.77 836.86 850.07 5961953.17 847.15 870.87 5961963.91 855.92 888.60 5961973.07 863.78 904.26 5961981.27 870.78 918.62 5961988.58 876.82 931.76 5961994.90 881.99 943.27 5962000.32 886.40 953.31 5962004.95 890.04 962.05 5962008.77 892.82 969.23 5962011.71 895.19 974.99 5962014.21 897.53 979.43 5962016.65 899.64 982.32 5962018.82 901.14 984.30 5962020.37 902.14 985.62 5962021.39 902.83 986.20 5962022:09 903.10 986.20 5962022.37 903.25 985.66 5962022.50 MapE Tool ft 664141.10 BOSS-GYRO 664144.92 BOSS-GYRO 664150.21 BOSS-GYRO 664152.93 BOSS-GYRO 664155.40 BOSS-GYRO 664162.21 BOSS-GYRO 664174.81 BOSS-GYRO 664191.77 BOSS-GYRO 664210.55 BOSS-GYRO 664230.84 BOSS-GYRO 664253.11 BOSS-GYRO 664277.60 BOSS-GYRO 664303.91 BOSS-GYRO 664331.98 BOSS-GYRO 664362.17 BOSS-GYRO 664394.18 BOSS-GYRO 664427.48 BOSS-GYRO 664460.93 BOSS-GYRO 664493.77 BOSS-GYRO 664526.33 BOSS-GYRO 664559.52 BOSS-GYRO 664593.83 BOSS-GYRO 664628.96 BOSS-GYRO 664665.76 BOSS-GYRO 664705.46 BOSS-GYRO 664745.62 BOSS-GYRO 664784.18 BOSS-GYRO 664822.57 BOSS-GYRO 664840.79 BOSS-GYRO 664856.97 BOSS-GYRO 664871.50 BOSS-GYRO 664885.33 BOSS-GYRO 664912.54 BOSS-GYRO 664938.13 BOSS-GYRO 664961.53 BOSS-GYRO 664982.09 BOSS-GYRO 664999.63 BOSS-GYRO 665015.12 BOSS-GYRO 665029.31 BOSS-GYRO 665042.32 BOSS-GYRO 665053.71 BOSS-GYRO 665063.65 BOSS-GYRO 665072.31 BOSS-GYRO 665079.43 BOSS-GYRO 665085.13 BOSS-GYRO 665089.53 BOSS-GYRO 665092.37 BOSS-GYRO 665094.31 BOSS-GYRO 665095.62 BOSS-GYRO 665096.18 BOSS-GYRO 665096.17 BOSS-GYRO 665095.63 BOSS-GYRO • Halliburton Company Survey Report Companyc BP Amoco Date: 6/6/2006 Tune: 08:33:35 Page: 3 Fieldd Prudhoe Bay Co-ordinate(NE) Reference: Well: C-16, True North. Site: PB C Pad Vertical (TVD) Reference: C-16B 61.8 Well: C-16 Section (VS) Reference: Well (O.OON,O.OOE,205.OOAzi) Wellpath: C-166 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD N/S E/W MapN MapE Too[ ft deg deg' ft ft ft ft ft ft" 7802. 57 0.63 278. 90 7502. 58 7440.81 903. 41 984.76 5962022.64 665094.72 BOSS-GYRO 7902. 57 0.20 249. 10 7602. 58 7540.81 903. 44 984.05 5962022.65 665094.02 BOSS-GYRO 8002. 57 0.25 268. 70 7702. 58 7640.81 903. 37 983.67 5962022.57 665093.64 BOSS-GYRO 8102. 57 0.08 318. 61 7802. 58 7740.81 903. 42 983.41 5962022.62 665093.37 BOSS-GYRO 8202. 57 0.77 339. 80 7902. 58 7840.81 904. 10 983.13 5962023.29 665093.08 BOSS-GYRO 8302. 57 1.35 322. 21 8002. 56 7940.79 905. 66 982.17 5962024.83 665092.09 BOSS-GYRO 8402. 57 1.77 322. 80 8102. 52 8040.75 907. 82 980.52 5962026.96 665090.39 BOSS-GYRO 8502. 57 1.88 316. 71 8202. 47 8140.70 910. 25 978.46 5962029.34 665088.28 BOSS-GYRO 8602. 57 1.80 323. 00 8302. 42 8240.65 912. 69 976.39 5962031.74 665086.15 BOSS-GYRO 8702. 57 1.57 334. 40 8402. 38 8340.61 915. 18 974.85 5962034.19 665084.56 BOSS-GYRO 8802. 57 1.53 340. 61 8502. 34 8440.57 917. 68 973.82 5962036.67 665083.47 BOSS-GYRO 8902. 57 1.10 329. 11 8602. 31 8540.54 919. 76 972.88 5962038.73 665082.49 BOSS-GYRO 9002. 57 1.08 315. 90 8702. 29 8640.52 921. 26 971.73 5962040.20 665081.31 BOSS-GYRO 9040. 00 1.10 309. 72 8739. 72 8677.95 921. 74 971.21 5962040.67 665080.78 MWD+IFR+MS 9054. 00 3.16 278. 92 8753. 71 8691.94 921. 89 970.73 5962040.81 665080.29 MWD+IFR+MS 9083. 00 6.52 222. 41 8782. 61 8720.84 920. 80 968.83 5962039.67 665078.41 MWD+IFR+MS 9117. 00 14.68 215. 38 8816. 01 8754.24 915. 85 965.02 5962034.65 665074.72 MWD+IFR+MS 9147. 60 22.32 220. 03 8845. 01 8783.24 908. 23 959.03 5962026.90 665068.90 MWD+IFR+MS 9191. 93 33.25 225. 73 8884. 17 8822.40 893. 25 944.87 5962011.61 665055.07 MWD+IFR+MS 9223. 30 41.91 224. 91 8909. 01 8847.24 879. 80 931.29 5961997.87 665041.78 MWD+IFR+MS 9254. 26 49.69 221. 69 8930. 58 8868.81 863 .64 916.11 5961981.38 665026.97 MWD+IFR+MS 9285. 41 57.59 216. 37 8949. 04 8887.27 844 .14 900.38 5961961.55 665011.67 MWD+IFR+MS 9312. 81 65.23 213. 57 8962. 14 8900.37 824 .43 886.62 5961941.54 664998.34 MWD+IFR+MS 9347 .51 70.40 211. 11 8975. 24 8913.47 797 .29 869.45 5961914.03 664981.77 MWD+IFR+MS 9378 .68 78.16 208. 12 8983. 69 8921.92 771 .22 854.65 5961887.65 664967.54 MWD+IFR+MS 9406 .46 83.44 204. 88 8988. 13 8926.36 746 .69 842.43 5961862.86 664955.86 MWD+IFR+MS 9425 .00 87.55 202 .04 8989 .58 8927.81 729 .74 835.07 5961845.75 664948.88 MWD 9453 .46 80.77 201 .50 8992 .48 8930.71 703 .46 824.58 5961819.26 664938.96 MWD 9481 .93 79.01 199 .00 8997 .47 8935.70 677 .17 814.88 5961792.76 664929.83 MWD 9510 .63 81.28 198 .25 9002 .39 8940.62 650 .38 805.85 5961765.78 664921.39 MWD 9540 .10 83.50 193 .30 9006 .29 8944.52 622 .28 797.91 5961737.51 664914.07 MWD 9571 .34 84.46 189 .26 9009 .57 8947.80 591 .81 791.84 5961706.93 664908.67 MWD 9597 .62 85.25 185 .39 9011 .93 8950.16 565 .86 788.50 5961680.91 664905.90 MWD 9635 .49 85.43 180 .12 9015 .01 8953.24 528 .17 786.69 5961643.19 664904.91 MWD 9664 .61 84.99 179 .59 9017 .44 8955.67 499 .15 786.76 5961614.18 664905.62 MWD 9696 .91 84.81 172 .21 9020 .31 8958.54 467 .09 789.06 5961582.18 664908.61 MWD 9728 .15 87.27 172 .03 9022 .47 8960.70 436 .22 793.33 5961551.41 664913.56 MWD 9764 .74 87.19 176 .07 9024 .24 8962.47 399 .87 797.12 5961515.16 664918.14 MWD 9795 .87 90.35 178 .18 9024 .91 8963.14 368 .80 798.68 5961484.13 664920.38 MWD 9829 .18 91.93 181 .87 9024 .24 8962.47 335 .50 798.67 5961450.84 664921.09 MWD 9858 .99 91.81 186 .49 9023 .27 8961.50 305 .79 796.50 5961421.10 664919.57 MWD 9893 .80 94.63 189 .31 9021 .32 8959.55 271 .38 791.72 5961386.58 664915.55 MWD 9922 .84 92.60 193 .36 9019 .48 8957.71 242 .97 786.03 5961358.06 664910.48 MWD 9951 .87 92.07 194 .77 9018 .30 8956.53 214 .83 778.98 5961329.78 664904.04 MWD 9990 .51 92.60 200 .94 9016 .73 8954.96 178.10 767.15 5961292.80 664893.02 MWD 10024 .90 91.37 204 .28 9015 .53 8953.76 146 .38 753.93 5961260.80 664880.50 MWD 10066 .89 90.75 210 .45 9014 .76 8952.99 109 .11 734.64 5961223.12 664862.03 MWD 10116 .93 91.01 216 .44 9013 .99 8952.22 67 .38 707.08 5961180.80 664835.39 MWD 10143 .76 92.42 218 .21 9013 .18 8951.41 46 .06 690.82 5961159.13 664819.60 MWD 10171 .40 90.57 219 .97 9012 .46 8950.69 24 .61 673.40 5961137.31 664802.66 MWD 10201 .65 92.16 224.37 9011 .74 8949.97 2 .20 653.11 5961114.47 664782.85 MWD 10238 .96 90.48 219 9010 .88 8949.11 -23.81 626.38 5961087.88 664756.70 MWD 10269 .82 91.63. 228.6Q 9010.31 8948.54 -44.49 603.49 5961066.70 664734.27 MWD • Halliburton Company Survey Report C Company:. BP Amoco Date: 6/6/2006 Time: 08:33:35 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: C-16, True North `Site: PB C Pad Vertical (TVD) Reference: C-166 61.8 Well: C-1 6 Section (VS) Reference: : Well{O.OON ,O'.OO E,205.OOAzi) Wellpatbs C-1 6B Survey Calculation Metbod: Minimum Curvature Db: Orate Survey MD Incl Azim TVD Sys TVD N/S E/W MapN MapE Tool ft- deg deg ft ft ft ft ft ft 10302. 02 92.44 231.43 9009.17 8947. 40 -65. 17 578.83 5961045. 49 664710. 08 MWD 10326. 57 92.69 227.90 9008.07 8946. 30 -81. 04 560.14 5961029. 22 664691. 74 MWD 10361. 45 89.25 222.43 9007.48 8945. 71 -105. 62 535.42 5961004. 11 664667. 56 MWD 10398. 34 87.84 220.50 9008.42 8946. 65 -133. 25 511.01 5960975. 95 664643. 76 MWD 10440. 20 82.82 217.15 9011.83 8950. 06 -165 .74 484.86 5960942. 91 664618. 33 MWD 10473. 38 83.70 213.27 9015.72 8953. 95 -192 .65 465.86 5960915. 58 664599. 93 MWD 10504. 07 85.46 215.03 9018.62 8956. 85 -217. 93 448.71 5960889. 93 664583. 33 MWD 10535. 99 88.55 209.75 9020.29 8958. 52 -244. 84 431.65 5960862. 66 664566. 86 MWD 10564. 04 87.40 209.57 9021.28 8959. 51 -269. 20 417.78 5960838. 01 664553. 53 MWD 10602. 33 88.11 200.76 9022.78 8961. 01 -303 .79 401.52 5960803. 07 664538. 03 MWD 10634. 58 88.37 197.24 9023.77 8962. 00 -334 .27 391.03 5960772. 38 664528. 21 MWD 10665. 24 88.99 192.65 9024.48 8962. 71 -363 .88 383.13 5960742. 61 664520. 96 MWD 10705. 79 91.37 191.42 9024.35 8962. 58 -403 .53 374.67 5960702. 78 664513. 37 MWD 10733. 37 91.10 194.59 9023.76 8961. 99 -430 .39 368.47 5960675. 79 664507. 75 MWD 10771. 68 90.57 198.29 9023.20 8961. 43 -467 .13 357.63 5960638. 83 664497. 72 MWD 10804. 69 94.98 202.35 9021.60 8959. 83 -498 .03 346.19 5960607. 68 664486. 96 MWD 10852. 48 99.65 204.64 9015.52 8953. 75 -541 .49 327.30 5960563. 83 664469. 03 MWD 10886. 56 98.68 205.34 9010.09 8948. 32 -571 .99 313.09 5960533. 03 664455. 48 MWD 10923. 92 93.57 204.11 9006.10 8944. 33 -605 .72 297.56 5960498. 97 664440. 69 MWD 10968. 06 90.13 204,28 9004.68 8942. 91 -645 .95 279.48 5960458. 35 664423. 50 MWD 11008. 74 88.72 210.45 9005.09 8943 .32 -682 .06 260.79 5960421. 85 664405. 61 MWD 11044. 27 89.34 211.51 9005.69 8943 .92 -712 .52 242.51 5960391. 00 664387. 99 MWD 11083. 92 88.11 210.98 9006.57 8944 .80 -746 .40 221.94 5960356. 67 664368. 18 MWD 11114. 38 87.14 215.21 9007.83 8946 .06 -771 .90 205.33 5960330. 83 664352. 13 MWD 11159. 23 87.19 224.06 9010.06 8948 .29 -806 .36 176.79 5960295. 75 664324. 34 MWD 11191. 69 90.12 223.00 9010.82 8949 .05 -829 .88 154.44 5960271. 75 664302. 51 MWD 11224. 49 90.44 227.40 9010.66 8948 .89 -852 .99 131.17 5960248. 14 664279. 76 MWD 11259. 32 89.12 235.31 9010.79 8949 .02 -874 .72 103.99 5960225. 82 664253 .06 MWD 11286. 93 87.32 239.22 9011.65 8949 .88 -889 .64 80.78 5960210. 40 664230 .19 MWD 11325. 38 91.14 241.64 9012.17 8950 .40 -908 .61 47.35 5960190. 70 664197 .18 MWD 11355. 76 91.05 247.62 9011.59 8949 .82 -921 .62 19.92 5960177. 10 664170 .04 MWD 11385. 63 90.26 249.20 9011.24 8949 .47 -932 .61 -7.85 5960165 .51 664142 .52 MWD 11419. 25 87.98 252.54 9011.76 8949 .99 -943 .62 -39.61 5960153 .80 664111 .01 MWD 11465. 00 87.98 252.54 9013.37 8951 .60 -957 .34 -83.22 5960139 .14 664067 .71 MWD TREE _ . 6" FMC WELLHEAD = FMC ACTUATOR = OTIS KB. E1EV = 63.70' BF. ELEV = 37.01' KOP = 2900' Max Angle = 99 @ 10852' Datum MD = 9167' Datum TV D = 8800' SS TOP OF 7" SCAB LNR ~ 2672' 13-318" CSG, 72#, L-80, ID = 12.347° 2691' Minimum ID = 2.37" @ 9643' TIW LSL Sub,3-3/16X2-7/8" XO 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I~ 8073' 9-5/8" CSG, 47#, L-80, ID = 8.681" I--I 8578' 4-112" LNR, 12.6#, L-80..0152 bpf, ID = 3.958" 8904' TOP OF WHIPSTOCK 9040' EZSV BRIDGE PLUG 9054' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 9475' PERFORATION SUMMARY REF LOG: SWS MCNUGR OF 05!21/2006 ANGLE AT TOP PERF: 85 @ 9600' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2.00" 6 9600 - 9660 OPEN 05/21/06 2.00" 6 9880 - 10020 OPEN 05/21/06 2.00" 6 10470 - 10540 OPEN 05/21!06 2.00" 6 10580 - 10710 OPEN 05/21/06 2.00" 6 10880 - 11420 OPEN 05121 /06 C-16B S from DRLG DRAFT 2197' 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I~ 10350' NOTES: ~ 4-1/2" HES X NIP, ID = 3.813" ~ 2673' I-1 9-5/8" X 7" BKR ZXP LNR TOP PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3887 3847 25 KBG-2 SO BK 20 05/27/06 3 6393 6097 9 KBG-2 DMY BK 0 06/07/03 2 7925 7625 0 KBG-2 DMY BK 0 06107/03 1 8761 8461 2 KBG-2 DMY BK 0 06/07/03 8827' ~-1 4-1/2" HES X NIP, ID = 3.813" I 8848' 7" X 4-1/2" BKR S-3 PERM PKR, ID = 3.875" 8871' 4-1 /2" HES X NIP, ID = 3.813" 8892' 4-1/2" HES XN NIP, ID = 3.725" (milled to 3 8") 8905' 4-1/2" WLEG, ID = 3.958" 8902' 7" X 5" BKR ZXP LNR TOP PKR MILLOUT WINDOW 9040 ' - 9062' / 9365' KB Liner Top Packer 9372' Top of 3-1/2" Liner 9391' 3-112" XN NIP. ID = 2.75" 9641' 3-3116 x 2-7/8 LSL XO 3-3116" X 2-7/8" Cemented/Perf'd I 11456' 9425' Mechanical Whipstock 9440' CIBP 10265' PBTD DATE REV BY COMMENTS DATE REV BY COMMENTS 06/12/80 ORIGINAL COMPLETION 05/27/06 DTR/PJC GLV GO 06/07(03 DAV/KK RIG SIDETRACK (C-16A) 06/19/03 JCM/TLH GLV C%O 09!15/03 CMO/TLP DATUM MD 8 REF LOG 05/10/04 KSB/KAK GLV GO 05/22/06 RRW CTD HORIZONTAL SIDETRACK PRUDHOE BAY UNfT WELL: G166 PERMIT No: 82030840 API No: 50-029-20438-02 SEC 19, T11 N, R14E, 115.96' FNL & 1218.02' FEL BP Exploration (Alaska) .~ ~~ '~~~ d ! ~ ~ ~ a1 ~ ~ ~ ~ .~; ~ ym ~~ FRANK H. MURKOWSKI, GOVERNOR s r OIL tusil V[Ca-7 ~ 333 W. 7T" AVENUE, SUITE 100 COI~TSERQA~'IO1K COD'II~'II5SIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 Sean McLaughlin FAx (907) 276-7542 CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-16B BP Exploration (Alaska) Inc. Permit No: 206-051 Surface Location: 116' FNL, 1218' FEL, SEC. 19, T11N, R14E, UM Bottomhole Location: 4087' FSL, 1408' FEL, SEC. 19, Tl 1N, R14E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 6~-3607 (pager). N DATED this~day of April, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALA! OIL AND GAS CONSERVATION COMI'~ION PERMIT TO DRILL 20 AAC 25.005 W~~ `4~'G~1VED 1 a. Type of work ® Drill ^Redrill ^ Re-Entry 1 b. Current Well Class D Exploratory D Development Gas ^ ervice ^ Multiple Zone D Stratigraphic Test ~hevelopment Oil ^ Single Zone 1 c. Specify if well is prop ed or: ^ Coalbed Methane ~'f3`a5'~{~ tes ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ^ Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU C-16B ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11625 TVD 8952 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 116' FNL 1218' FEL SEC 19 T11N R14E UM 7. Property Designation: ADL 028305 Pool , , , . , , Top of Productive Horizon: 758' FSL, 289' FEL, SEC. 18, T11N, R14E, UM 8. Land Use Permit: 13. Approximate Sp Date: Jun 1 006 Total Depth: 4087 FSL, 1408' FEL, SEC. 19, T11 N. R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: .22100' 4b. Location of Well (State Base Plane Coordinates): Surface: x-664130 y-5961098 Zone-ASP4 10. KB Elevation (Height above GL): 61.77' feet 15. Distance to Nearest Well Within Pool: 850' 16. Deviated Wells: Kickoff Depth: 9420 feet Maximum Hole Angle: 100.03 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3100 Surface: 2220 18. Casin Program: S ecifications Top - Settin De th -Bottom Quantity of Cement, c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" 33/16° x s-~/s° 6.2# / 6.16# L-80 TCI I/STL 2245' 9380' 8926' 11625' 8952' 116 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 10350 Total Depth TVD (ft): 8973 Plugs (measured): None Effective Depth MD (ft): 10266 Effective Depth TVD (ft) 8978 Junk (measured): None Casing Length :Size Cement Volume MD TVD Conductor /Structural 110' 20" x 30" 12.9 cu ds Concrete 110' 110' Surface 2691' 13-3/8" 3720 cu ft Permafrost II 2691' 2691' Intermediate 8578' 9-5/8" 1160 cu ft Class 'G', 130 cu ft Arcticset 8578' 8278' Production 5401' 7" Scab Liner: 870 cu ft Class 'G' 2672' - 8073' 2672' - 7773' Liner 967' 7" 401 cu ft Class 'G' 8073' - 9040' 7773' - 8740' Liner 1456' 4-1 /2" 225 cu ft Class 'G' 8894' - 10350' 8594' - 8973' Perforation Depth MD (ft): 9725' - 10200' Perforation Depth TVD (ft): 8984' - 8981' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ^ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis p Property Plat D Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Sean McLaughlin Title CT Drilling Engineer Si nature /,,/~ Phone 564-4387 Date 3 Contact Sean McLaughlin, 564-4387 Prepared By Name/Number: OG Commission Use Only Permit To Drill Number: Z ~- C~,S API Number: Permit pro 50- 029-20438-02-00 Date: -- "- ,,,, ~ J See cover letter for other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, as ydrates, or gas contained shales Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes~No L L HZS Measures:~Yes ^ it tional Survey Req'd:~Yes ^ No Other:Tf~S` ~~~~ (D 3St7O r0~, A PROVED BY THE COMMISSIO Date ~~~~ v , ,COMMISSIONER -~~~f~ Form 10-401 Revised 12/2005 ~ ; ~ ~ ~ -`~ ~ / ~ Submit In Duplicate . ~ ~,/ • BP Prudhoe Bay C-16B CTD Sidetrack CTD Sidetrack Summary Pre-Rig Work: 1. O AC-LDS; AC-PPPOT-IC, T 2. S Caliper liner and tubing 3. S Set DGLV's 4. O MIT-IA and MIT-OA 5. C Run dummy whipstock drift 6. C Run MGR/CCL tie in log 7. C Set CIBP at 9435' ~ 8. O Bleed gas lift and production flowlines down to zero and blind flange 9. O Remove wellhouse, level pad The pre CTD work is slated to begin on May 1, 2006. Rig Work: 1. MIRU and test BOPE to 250 psi low and SOOrp'si high. 2. Set Wfd LSX whipstock at 9420' ~ ;; -~' 3. Mill XN nipple, 3.8" window at 9420', and 10' of rathole. Swap the well to Flo-Pro. ~ 4. Drill Lateral: 4.125" OH, 2205' horizontal (12 deg/100 planned), with resistivity 5. MAD pass with resistivity tools in memory mode 6. Run 3-3/16" 2-7/8" solid liner leaving TOL at 9 0' ~ 7. Pump primary cement leaving TOC at 9380', 2 bl of 15.8 ppg liner cmt planned 8. Cleanout liner and MCNL/GR/CCL log - 9. Test liner lap to 2000 psi. 10. Perforate liner per asset instructions 0600') 11. Freeze protect well, RDMO Post-Rig Work: 1. Move wellhouse, Install production flowline 2. Run GLVs 3. Flowback well to separator Mud Program: j,i • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCII 9380' and - 10200' and • 2-7/8", L-80 6 STL 10200'md - 11625'md • A minimum o 2~. bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9380' Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. ~ • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 100 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 22,100 ft. • Distance to nearest well within pool - 850 ft. Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole CNL/GR/CCL log will be run. Hazards • The maximum recorded H2S level on C pad is~1Q.~pm • Lost circulation risk is low, no fault crossings--~xpected. Reservoir Pressure • The max res. press. is estimated to be 3100 psi at 8800'ss (6.8_ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface is~0~si. TREE _ 6" FMC WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV = 63.70' BF. ELEV.- _ 37.01, KOP = 2900' Max Angle = 97 @ 9500' Datum MD = 9167 Datum TV D = 8800' SS • TOP OF 7" SCAB LNR 2672' 13-3l8" CSG, 72#, L-80, ID = 12.347" 2691' Minimum ID = 3.725" @ 8892' 4-1/2" HES XN NIPPLE 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 8073' 9-5/8" CSG, 47#, L-80, ID = 8.681" I-I $578' I4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 8904' TOP OF WHIPSTOCK 9040' EZSV BRIDGE PLUG 9054' PERFORATION SUMMARY REF LOG: MWD GR ON 05/26/03 ANGLE AT TOP PERF: 90 @ 9725' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 9725 - 9775 O 06/05/03 2-7/8" 4 9950 - 10200 O 06/05/03 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 9475' C-16A ' 2197' I~ 4-1/2" HES X NIP, ID = 3.813" 2673' ~~ 9-5/8" X 7" BKR ZXP LNR TOP PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3887 3847 25 KBG-2 DMY BK 0 05/10!04 3 6393 6097 9 KBG-2 DMY BK 0 06/07/03 2 7925 7625 0 KBG-2 DMY BK 0 06/07/03 1 8761 8461 2 KBG-2 DMY BK 0 06/07/03 8827' l-~ 4-1/2" HES X NIP, ID = 3.813" 8848' 7" X 4-1/2" BKR S-3 PERM PKR ID = 3.875" 8871' 4-1 /2" HES X NIP, ID = 3.813" 8892' 4-1/2" HES XN NIP, ID = 3.725" 8905' 4-1l2" WLEG, ID = 3.958" 8902' 7" X 5" BKR ZXP LNR TOP PKR \ MILLOUT WINDOW 9040' - 9062' 10265' I--I PBTD 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10350' DATE REV BY COMMEMS DATE REV BY COMMENTS 06!12/80 ORIGINAL COMPLETION 06/07/03 DAV/KK RIG SIDETRACK (C-16A) 06/19/03 JCM/TLH GLV C/O 09/15/03 CMO/TLP DATUM MD & REF LOG 05/10!04 KSB/KAK GLV C/O PRUDHOE BAY UNff WELL: G16A PERMIT No: 2030840 API No: 50-029-20438-01 SEC 19, T11N, R14E, 115.96' FNL & 1218.02' FEL BP Exploration (Alaska) TREE = 6" FMC WELLHEAD= FMC ACTUATOR = OTIS KB. ELEV = 63.70' BF. ELEV = 37.01' KOP = 2900' Max Angle = 97 rQ 9500' Datum MD = 9167' Datum ND = 8800' SS TOP OF 7" SCAB LNR ~--~ 2672 13-3/8" CSG, 72#, L-80, ID = 12.347" ~~ 2691' Minimum ID = 3.725" @ 8892' 4-1/2" HES XN NIPPLE (milled to 3.8") 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" ~ 9-5/8" CSG, 47#, L-80, ID = 8.681" ~ 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 8904' TOP OF WHIPSTOCK 9040 EZSV BRIDGE PLUG 9054' 7" LNR, 29#, L-80, .0371 bpf, O = 6.184" 9475 C-16B Proposed CTD Sidetrack PERFORATION SUMMARY REF LOG: MWD GR ON 05/26/03 ANGLEATTOPPERF: 90 ~ 9725' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 9725 - 9775 isolated proposed 2-7/8" 4 9950-10200 isolated proposed 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 10350' NOTES: ~ 4-1/2" HES X NIP, ID = 3.813" ~ 9-5/8" X 7" BKR ZXP LNR TOP PKR GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3887 3847 25 KBG-2 DMY BK 0 05/10/04 3 6393 6097 9 KBG-2 DMY BK 0 06/07/03 2 7925 7625 0 KBG-2 DMY BK 0 06/07/03 1 8761 8461 2 KBG-2 DMY BK 0 06/07/03 8827 I~ 4-1/2" HES X NIP, ID = 3.813" 8848' 7" X 4-1/2" BKR S-3 PERM PKR, ID = 3.875" 8871 ~ 4-1 /2" HES X NIP, ~ = 3.813" 8892' 4-1/2" HES XN NIP, ID = 3.725" (milled to 3.8' ) 8905 4-1/2" WLEG, ~= 3.958" 8902 7" X 5" BKR ZXP LNR TOP PKR MILLOUT WINDOW 9040 ' - 9062' ~i 9380' L~~ner-cp Packer i 9390' sp ~ 2° ,_iner TOC 9400' 3-" 2" XN NIP, ID = 2.75" 10200' 3-3116 x 2-7'8 X-over ( 2-718" pre-drilled ~chanical ~~lfiipstoc CIB~P F931 V I DATE REV BY COMMENTS DATE REV BY COMMENTS 06112/80 ORIGINAL COMPLETION 06107/03 DAVIKK RIG SIDETRACK (C-16A) 06/19/03 JCM/TLH GLV C/O 09/15/03 CMO/TLP DATUM MD & REF LOG 05/10/04 KSB/KAK GLV C/O 11625' ~ PRUDHOE BAY UNfr WELL: G16A PERMfT No: 2030840 API No: 50-029-20438-01 SEC 19, T11N, R14E, 115.96' FNL 8 1218.02' FEL BP Exploration (Alaska) b • BP Alaska P Baker Hughes INTEQ Planning Report s~R ~ wuei~as INTEQ Company: BP Amocp Date: 3/9/2006 Time: 19:26:06 Page: 1 Field: Prudhoe Bay Co-ardinate(NE) Reterence: Well: C-16, True North Site: PB C Pad Vertical (T'VD) Reference: C- 16A: 61.8 Well: C-16 Seetion(VS)Refcregce: Well (O.OON,O.OOE,182.60Azi) Wellpath: Plan 6, C-16B Survey Calculation Method: Minimum Curvature Db: Qrade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Ceo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB C Pad TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5957218. 72 ft Latitude: 70 17 22.367 N From: Map Easting: 662550. 03 ft Longitude: 148 41 2.797 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.24 deg Well: C-16 Slot Name: 16 C-16 Well Position: +N/-S 3844.48 ft Northing: 5961098. 00 ft Latitude: 70 18 0.176 N +E/-W 1663.59 ft Easting : 664130. 00 ft Longitude: 148 40 14.299 W Position Uncertainty: 0.00 ft Wellpath: Plan 6, C-168 Drilled From: C-16AP61 Tie-on Depth: 9406.46 ft Current Daturo: C-16A: Height 61. 77 ft Above System Datum: Mean Sea Level Magnetic Data: 3/9/2006 Declination: 24.60 deg Field Strength: 57605 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.77 0.00 0.00 182.60 Plan: Pfan #6 Date Composed: 3/9/2006 Copy Lamar's PIan6 Version: 6 Principal: Yes Tied-to: From: Definitive Path Targets :Map Map 4--- Latitude: ----> <... ~ngifude --> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min See Dip. Dir. ft ft ft ft ft C-16B Polygon 61.77 508.78 841.37 5961625.00 664960.00 70 18 5.179 N 148 39 49.768 W -Polygon 1 61.77 508.78 841.37 5961625.00 664960.00 70 16 5.179 N 148 39 49.768 W -Polygon 2 61.77 133.08 868.18 5961250.00 664995.00 70 18 1.484 N 148 39 48.988 W -Polygon 3 61.77 -181.51 616.23 5960930.00 664750.00 70 17 58.390 N 148 39 56.334 W -Polygon 4 61.77 -675.10 315.35 5960430.00 664460.00 70 17 53.536 N 148 40 5.106 W -Polygon 5 61.77 -1309.39 -183.65 5959785.00 663975.00 70 17 47.298 N 148 40 19.652 W -Polygon 6 61.77 -1108.42 -454.35 5959980.00 663700.00 70 17 49.274 N 148 40 27.542 W -Polygon 7 61.77 -408.94 266.15 5960695.00 664405.00 70 17 56.154 N 148 40 6.540 W -Polygon 8 61.77 132.67 658.10 5961245.00 664785.00 70 18 1.480 N 148 39 55.113 W -Polygon 9 61.77 517.06 691.51 5961630.00 664810.00 70 18 5.261 N 148 39 54.138 W C-16B Faultl 61.77 470.56 530.44 5961580.00 664650.00 70 18 4.803 N 148 39 58.834 W -Polygon 1 61.77 470.56 530.44 5961580.00 664650.00 70 18 4.803 N 148 39 58.834 W -Polygon 2 61.77 455.32 770.18 5961570.00 664890.00 70 18 4.653 N 148 39 51.844 W -Polygon 3 61.77 357.09 1603.29 5961490.00 665725.00 70 18 3.686 N 148 39 27.556 W -Polygon 4 61.77 455.32 770.18 5961570.00 664890.00 70 18 4.653 N 148 39 51.844 W C-166 Fault3 61.77 -271.94 634.26 5960840.00 664770.00 70 17 57.501 N 148 39 55.809 W -Polygon 1 61.77 -271.94 634.26 5960840.00 664770.00 70 17 57.501 N 148 39 55.809 W -Polygon 2 61.77 -410.82 581.21 5960700.00 664720.00 70 17 56.135 N 148 39 57.356 W C-16B Fault4 61.77 -796.28 367.72 5960310.00 664515.00 70 17 52.344 N 148 40 3.580 W -Polygon 1 61.77 -796.28 367.72 5960310.00 664515.00 70 17 52.344 N 148 40 3.580 W -Polygon 2 61.77 -1301.00 576.76 5959810.00 664735.00 70 17 47.380 N 148 39 57.487 W C-166 Faultl 61.77 165.17 543.78 5961275.00 664670.00 70 18 1.800 N 148 39 58.446 W -Polygon 1 61.77 165.17 543.78 5961275.00 664670.00 70 18 1.800 N 148 39 58.446 W -Polygon 2 61.77 -317.53 203.13 5960785.00 664340.00 70 17 57.053 N 148 40 8.377 W C-16B Faults 61.77 -1212.80 -26.50 5959885.00 664130.00 70 17 48.248 N 148 40 15.071 W -Polygon 1 61.77 -1212.80 -26.50 5959885.00 664130.00 70 17 48.248 N 148 40 15.071 W -Polygon 2 61.77 -1278.36 227.15 5959825.00 664385.00 70 17 47.603 N 148 40 7.678 W C-166 Target 3 9005.77 -429.89 400.74 5960677.00 664540.00 70 17 55.948 N 148 40 2.617 W BP Alaska by Baker Hughes INTEQ Planning Report s~R ~ wut~s INTEQ Company? BP AmOCO `.Date: 3/9/2006 Time: 19:26:06 Page: 2 Field:. Prudhoe Bay Go-ordinate(NE) Reference: Well: C-16, TNe North Site:: ` PB C Pad Vertical (TVD) Reference: C -16A: 61.8 Welf; G-16 Section (VS) Refereuce: Well (O.OON,O.OOE,182.60Azi) Wellpath: Plan 6, C-168 Survey Cakulation Method: Minimum Curvature Db: Oracle Targets Map Map <-' Latitude ---> <- Longitude -_> -Name Description: -TVD +NI-S +E/-W Nort6ins Eastieig Deg Min Sec Deg Min Sec Dip. Dia ft ft ft ft ft C-16B Target 4 9013.77 -1064.33 -183.30 5960030.00 663970.00 70 17 49.708 N 148 40 1 9.642 W C-16B Targetl 9021.77 420.75 841.45 5961537.00 664962.00 70 18 4.313 N 148 39 49.766 W C-166 Target 2 9021.77 -325.37 470.04 5960783.00 664607.00 70 17 56.976 N 148 40 0.596 W Annotation MD TVD , ft ft 9406.46 8988.13 TIP 9420.00 8989.32 KOP 9440.00 8990.29 End of 9 deg/100 DLS 9470.00 8990.75 4 9560.00 9000.27 5 9758.09 9022.07 End of 15 deg /100 DLs 9833.09 9022.07 7 10358.09 9022.07 8 10583.09 9022.07 9 10672.09 9014.30 10 10761.09 9006.54 11 10836.09 9006.98 12 11236.09 9010.97 13 11625.00 9013.59 TD Plan Section Information MD Inci Azim TVD +N!-S +E/-W -DLS Build Tnm TFO Tarftet ft 'deg _deg ft ft ft deg/100ft deg/100ft dng/100ft deg 9406.46 83.44 204.88 8988.13 746.69 842.43 0.00 0.00 0.00 0.00 9420.00 86.44 202.80 8989.32 734.35 836.98 26.93 22.16 -15.36 325.27 9440.00 88.00 203.70 8990.29 716.00 829.09 9.00 7.80 4.50 30.00 9470.00 90.25 207.60 8990.75 688.97 816.11 15.00 7.51 12.99 60.00 9560.00 77.58 202.91 9000.27 608.23 777.98 15.00 -14.08 -5.21 200.00 9758.09 90.00 175.70 9022.07 416.04 747.07 15.00 6.27 -13.74 292.70 9833.09 90.00 166.70 9022.07 342.00 758.54 12.00 0.00 -12.00 270.00 10358.09 90.00 229.70 9022.07 -132.00 602.74 12.00 0.00 12.00 90.00 10583.09 90.00 202.70 9022.07 -311.90 471.09 12.00 0.00 -12.00 270.00 10672.09 100.03 206.39 9014.30 -392.44 434.34 12.00 11.27 4.15 20.00 10761.09 89.98 210.02 9006.54 -470.46 392.48 12.00 -11.29 4.08 160.00 10836.09 89.35 201.04 9006.98 -538.06 360.19 12.00 -0.83 -11.97 266.00 11236.09 89.57 249.04 9010.97 -812.48 85.35 12.00 0.05 12.00 90.00 11625.00 89.70 202.37 9013.59 - 1076.61 -185.39 12.00 0.03 -12.00 270.00 Survey MD Incl..` Aziro Sys.TVD N/S E/V1' MapN MapE DLS VS TFO Tool ft deg deg ft ft ft_ ft ft deg/100ft ft deg 9406.46 83.44 204.88 8926.36 746.69 842.43 5961862.86 664955.86 0.00 -784.14 0.00 MWD 9420.00 86.44 202.80 8927.55 734.35 836.98 5961850.41 664950.68 26.93 -771.57 325.27 MWD 9440.00 88.00 203.70 8928.52 716.00 829.09 5961831.89 664943.20 9.00 -752.87 30.00 MWD 9450.00 88.75 205.00 8928.80 706.89 824.97 5961822.70 664939.28 15.00 -743.59 60.00 MWD 9470.00 90.25 207.60 8928.98 688.97 816.11 5961804.58 664930.81 15.00 -725.28 59.96 MWD 9475.00 89.55 207.34 8928.99 684.53 813.81 5961800.10 664928.60 15.00 -720.74 200.00 MWD 9500.00 86.02 206.06 8929.95 662.22 802.58 5961777.54 664917.87 15.00 -697.94 200.00 MWD 9525.00 82.50 204.76 8932.45 639.75 791.91 5961754.85 664907.69 15.00 -675.02 200.05 MWD 9550.00 78.98 203.44 8936.47 617.23 781.84 5961732.12 664898.11 15.00 -652.06 200.18 MWD 9560.00 77.58 202.91 8938.50 608.23 777.98 5961723.04 664894.46 15.00 -642.90 200.39 MWD 9575.00 78.46 200.79 8941.62 594.61 772.52 5961709.30 664889.30 15.00 -629.05 292.70 MWD 9587.28 79.18 199.06 8944.00 583.28 768.42 5961697.89 664885.44 15.00 -617.54 293.14 C-166 T 9600.00 79.95 197.29 8946.30 571.40 764.52 5961685.93 664881.80 15.00 -605.50 293.47 MWD 9625.00 81.48 193.82 8950.34 547.64 757.91 5961662.02 664875.71 15.00 -581.46 293.80 MWD 9650.00 83.04 190.38 8953.71 523.42 752.72 5961637.70 664871.05 15.00 -557.03 294.36 MWD b ~ BP Alaska p Baker Hughes INTEQ Planning Report s~R ~ eu~~s INTEQ Company: BP Amoco- Date: 3!9/2006 - Time: 19:26:06 Page: 3 Field: 'Prudtwe Bay Go-ordinataNE) Reference: Well: C-16, True North Site: PB C Pad Vertieai (TVD) Reference: G16A: 61:8 We1L• C-1 6 Section(VS)Referen¢e: Well(O.OON, O.OOE,182.60Azi) Welipath: Plan 6, C-'168 Survey Gaku{ationMethod: Minimum Cu rvature Db: Oracle Survey MD Inel Azim Sys TVD N/S E/W MapN ` MapE DIS VS TFO Tool ft deg deg ft ft ft tt ft deg/100ft ft deg 9675.00 84.63 186.96 8956.39 498.85 748.97 5961613.06 664867.84 15.00 -532.32 294.82 MWD 9700.00 86.23 183.56 8958.38 474.04 746.69 5961588.21 664866.10 15.00 -507.43 295.19 MWD 9725.00 87.85 180.17 8959.68 449.09 745.88 5961563.25 664865.84 15.00 -482.47 295.46 MWD 9750.00 89.47 176.79 8960.26 424.11 746.54 5961538.29 664867.05 15.00 -457.54 295.63 MWD 9758.09 90.00 175.70 8960.30 416.04 747.07 5961530.23 664867.75 15.00 -449.50 295.71 MWD 9775.00 90.00 173.67 8960.30 399.20 748.64 5961513.43 664869.69 12.00 -432.75 270.00 MWD 9800.00 90.00 170.67 8960.30 374,44 752.05 5961488.75 664873.63 12.00 -408.17 270.00 MWD 9825.00 90.00 167.67 8960.30 349.89 756.74 5961464.31 664878.87 12.00 -383.86 270.00 MWD 9833.09 90.00 166.70 8960.30 342.00 758.54 5961456.46 664880.83 12.00 -376.06 270.00 MWD 9850.00 90.00 168.72 8960.30 325.48 762.14 5961440.03 664884.79 12.00 -359.72 90.00 MWD 9875.00 90.00 171.72 8960.30 300.85 766.38 5961415.49 664889.57 12.00 -335.30 90.00 MWD 9900.00 90.00 174.72 8960.30 276.02 769.33 5961390.74 664893.06 12.00 -310.64 90.00 MWD 9925.00 90.00 177.72 8960.30 251.08 770.98 5961365.84 664895.25 12.00 -285.79 90.00 MWD 9950.00 90.00 180.72 8960.30 226.08 771.32 5961340.86 664896.14 12.00 -260.84 90.00 MWD 9975.00 90.00 183.72 8960.30 201.11 770.35 5961315.87 664895.71 12.00 -235.84 90.00 MWD 10000.00 90.00 186.72 8960.30 176.21 768.07 5961290.93 664893.98 12.00 -210.87 90.00 MWD 10025.00 90.00 189.72 8960.30 151.47 764.49 5961266.12 664890.95 12.00 -186.00 90.00 MWD 10050.00 90.00 192.72 8960.30 126.95 759.63 5961241.51 664886.62 12.00 -161.28 90.00 MWD 10075.00 90.00 195.72 8960.30 102.72 753.48 5961217.15 664881.01 12.00 -136.80 90.00 MWD 10100.00 90.00 198.72 8960.30 78.85 746.08 5961193.12 664874.13 12.00 -112.61 90.00 MWD 10125.00 90.00 201.72 8960.30 55.39 737.44 5961169.48 664866.00 12.00 -88.79 90.00 MWD 10150.00 90.00 204.72 8960.30 32.42 727.58 5961146.30 664856.65 12.00 -65.39 90.00 MWD 10175.00 90.00 207.72 8960.30 10.00 716.54 5961123.64 664846.10 12.00 -42.49 90.00 MWD 10200.00 90.00 210.72 8960.30 -11.82 704.33 5961101.57 664834.37 12.00 -20.14 90.00 MWD 10225.00 90.00 213.72 8960.30 -32.97 691.00 5961080.14 664821.51 12.00 1.59 90.00 MWD 10250.00 90.00 216.72 8960.30 -53.39 676.59 5961059.41 664807.54 12.00 22.64 90.00 MWD 10275.00 90.00 219.72 8960.30 -73.02 661.12 5961039.44 664792.51 12.00 42.96 90.00 MWD 10300.00 90.00 222.72 8960.30 -91.83 644.65 5961020.28 664776.45 12.00 62.49 90.00 MWD 10325.00 90.00 225.72 8960.30 -109.74 627.21 5961002.00 664759.41 12.00 81.17 90.00 MWD 10350.00 90.00 228.72 8960.30 -126.71 608.86 5960984.62 664741.44 12.00 98.96 90.00 MWD 10358.09 90.00 229.70 8960.30 -132.00 602.74 5960979.20 664735.43 12.00 104.52 90.00 MWD 10375.00 90.00 227.67 8960.30 -143.16 590.04 5960967.77 664722.98 12.00 116.25 270.00 MWD 10400.00 90.00 224.67 8960.30 -160.48 572.01 5960950.07 664705.33 12.00 134.36 270.00 MWD 10425.00 90.00 221.67 8960.30 -178.71 554.90 5960931.47 664688.64 12.00 153.35 270.00 MWD 10450.00 90.00 218.67 8960.30 -197.81 538.78 5960912.02 664672.93 12.00 173.17 270.00 MWD 10475.00 90.00 215.67 8960.30 -217.73 523.68 5960891.78 664658.27 12.00 193.75 270.00 MWD 10500.00 90.00 212.67 8960.30 -238.41 509.64 5960870.79 664644.69 12.00 215.05 270.00 MWD 10525.00 90.00 209.67 8960.30 -259.80 496.70 5960849.13 664632.22 12.00 237.00 270.00 MWD 10550.00 90.00 206.67 8960.30 -281.84 484.90 5960826.84 664620.91 12.00 259.55 270.00 MWD 10575.00 90.00 203.67 8960.30 -304.46 474.27 5960803.99 664610.78 12.00 282.63 270.00 MWD 10583.09 90.00 202.70 8960.30 -311.90 471.09 5960796.48 664607.75 12.00 290.21 270.00 MWD 10600.00 91.91 203.39 8960.02 -327.46 464.47 5960780.79 664601.48 12.00 306.05 20.00 MWD 10625.00 94.72 204.42 8958.57 -350.27 454.36 5960757.76 664591.87 12.00 329.30 20.01 MWD 10650.00 97.54 205.46 8955.90 -372.81 443.88 5960735.00 664581.89 12.00 352.29 20.07 MWD 10672.09 100.03 206.39 8952.53 -392.44 434.34 5960715.16 664572.77 12.00 372.34 20.18 MWD 10675.00 99.70 206.51 8952.03 -395.01 433.06 5960712.57 664571.56 12.00 374.96 160.00 MWD 10700.00 96.88 207.54 8948.42 -417.04 421.82 5960690.30 664560.80 12.00 397.48 160.02 MWD 10725.00 94.06 208.56 8946.04 -439.00 410.12 5960668.09 664549.58 12.00 419.95 160.17 MWD 10750.00 91.23 209.57 8944.89 -460.83 397.99 5960646.01 664537.93 12.00 442.30 160.27 MWD 10761.09 89.98 210.02 8944.77 -470.46 392.48 5960636.26 664532.63 12.00 452.17 160.31 MWD 10775.00 89.86 208.36 8944.79 -482.60 385.70 5960623.98 664526.12 12.00 464.60 266.00 MWD 10800.00 89.65 205.36 8944.89 -504.90 374.40 5960601.44 664515.31 12.00 487.39 266.00 MWD 10825.00 89.45 202.37 8945.09 -527.76 364.29 5960578.36 664505.70 12.00 510.69 266.01 MWD 10836.09 89.35 201.04 8945.21 -538.06 360.19 5960567.97 664501.83 12.00 521.17 266.04 MWD 10850.00 89.35 202.71 8945.36 -550.97 355.01 5960554.96 664496.93 12.00 534.29 90.00 MWD 10875.00 89.36 205.71 8945.64 -573.76 344.75 5960531.94 664487.18 12.00 557.53 89.98 MWD 10900.00 89.36 208.71 8945.92 -595.99 333.33 5960509.47 664476.24 12.00 580.26 89.95 MWD 10925.00 89.37 211.71 8946.20 -617.59 320.75 5960487.60 664464.14 12.00 602.41 89.91 MWD BP Alaska by Baker Hughes INTEQ Planning Report s,~R ~ s INTEQ Company: BP AmoCO Date: 3/9!2006 Time: 19:26.06 Page: 4 Field: Prudhoe Bay Go-ordinate(NE) Reference: Wall: C-16, True. North Site::. PB' C Pad Vertkai (TVD}Reference: C-16A[ 61.8 Well: C-16 SeMi on (VS) Reference: Welt (4i00N, 0.OQE,182.60Azi) Wetlpat6: Plan 6, C-16B Survey Calculation Methode Minimum Curvature Db: Qrade Survey NID Ines Azim Sys TVD N/S FJW MapN MapE DIS VS ` TFO Tool ft deg deg ft' ft ft ft ft deg/f00ft ft' ' "deg 10950.00 89.37 214.71 8946.48 -638.50 307.06 5960466.40 664450.91 12.00 623.92 89.88 MWD 10975.00 89.38 217.71 8946.75 -658.67 292.29 5960445.91 664436.59 12.00 644.74 89.85 MWD 11000.00 89.39 220.71 8947.02 -678.04 276.49 5960426.21 664421.21 12.00 664.80 89.81 MWD 11025.00 89.40 223.71 8947.28 -696.55 259.69 5960407.33 664404.83 12.00 684.06 89.78 MWD 11050.00 89.42 226.71 8947.54 -714.16 241.95 5960389.34 664387.48 12.00 702.45 89.75 MWD 11075.00 89.43 229.71 8947.79 -730.82 223.32 5960372.28 664369.21 12.00 719.94 89.72 MWD 11100.00 89.45 232.71 8948.03 -746.48 203.83 5960356.21 664350.07 12.00 736.46 89.69 MWD 11125.00 89.47 235.71 8948.27 -761.09 183.56 5960341.15 664330.12 12.00 751.98 89.66 MWD 11150.00 89.49 238.71 8948.49 -774.63 162.54 5960327.16 664309.41 12.00 766.46 89.63 MWD 11175.00 89.51 241.71 8948.71 -787.05 140.85 5960314.27 664287.99 12.00 779.85 89.61 MWD 11200.00 89.53 244.71 8948.92 -798.31 118.54 5960302.52 664265.93 12.00 792.11 89.58 MWD 11225:00 89.56 247.71 8949.12 -808.40 95.66 5960291.94 664243.29 12.00 803.22 89.55 MWD 11236.09 89.57 249.04 8949.20 -812.48 85.35 5960287.63 664233.07 12.00 807.77 89.53 MWD 11250.00 89.57 247.37 8949.31 -817.64 72.44 5960282.19 664220.27 12.00 813.52 270.00 MWD 11275.00 89.57 244.37 8949.50 -827.86 49.62 5960271.48 664197.69 12.00 824.76 270.01 MWD 11300.00 89.57 241.37 8949.68 -839.26 27.38 5960259.60 664175.70 12.00 837.15 270.04 MWD 11325.00 89.58 238.37 8949.87 -851.80 5.76 5960246.58 664154.36 12.00 850.67 270.06 MWD 11350.00 89.58 235.37 8950.05 -865.46 -15.18 5960232.47 664133.73 12.00 865.26 270.08 MWD 11375.00 89.59 232.37 8950.23 -880.20 -35.37 5960217.30 664113.87 12.00 880.90 270.10 MWD 11400.00 89.59 229.37 8950.41 -895.97 -54.76 5960201.11 664094.83 12.00 897.54 270.12 MWD 11425.00 89.60 226.37 8950.59 -912.74 -73.30 5960183.94 664076.66 12.00 915.13 270.15 MWD 11450.00 89.61 223.37 8950.76 -930.45 -90.93 5960165.85 664059.42 12.00 933.62 270.17 MWD 11475.00 89.62 220.37 8950.93 -949.07 -107.62 5960146.87 664043.14 12.00 952.97 270.19 MWD 11500.00 89.63 217.37 8951.09 -968.53 -123.31 5960127.08 664027.88 12.00 973.12 270.21 MWD 11525.00 89:64 214.37 8951.25 -988.78 -137.96 5960106.51 664013.68 12.00 994.02 270.23 MWD 11550.00 89.66 211.37 8951.40 -1009.78 -151.52 5960085.22 664000.58 12.00 1015.61 270.25 MWD 11575.00 89.67 208.37 8951.55 -1031.45 -163.97 5960063.28 663988.60 12.00 1037.83 270.26 MWD 11600.00 /89.69 205.37 8951.69 -1053.75 -175.27 5960040.75 663977.79 12.00 1060.62 270.28 MWD 11625.00 89.70 202.37 8951.82 -1076.61 -185.39 5960017.67 663968.18 12.00 1083.91 270.30 3.50" • • jtti iTtt,'tti fiTt~-liltf ii7t ll,~ ~t#r.Ffaj ~ {i,~} t~i i.. i$ I~ ~ ~~i'r ~~ ~ ~ til' Sktr a~~i ~~11 ~ ~~~~1~1 i~f~.l~~I ~1~1 ~~ / IF ~ ~ E4-r ~ i,;7~- t r i.'_ jrr SYr 1'7 I, I,- r 'rill Ft LLB*4 L+- t r ~'~ !-.+~ 4-i $ i r ~~1 - G- ,_ t1+11:{,~ ,r,~._,~,~ ri~.~~r~~l~ifillit lf~T:~lii ~~~~~~-1i ~ ...~ ,~~+~I~1.. C~. r+.:?tl I ~.i r~i1 t l; tlfi + ~~ r r 1. i. 11 i li_ $ ~. ;~.. III r11i t#rl r~l, +r~f f~~' „hi ~. III I t ,: ~~~, 't t ~ , , ~_,. ~~ ritl tr~~~til, I ik~iftl iiiE l~ ~ !~ '~~r) :I .~ .: rl~ .t-~ i ~ii IIII a i `I-i I.,: rlll,l I 1 ' '~ ~~.'_ { +, ~ 1 ~' Ga .ri ~r~ ifTr frf~ r~1 r .+ ,, / 4` !,{lt ~ri.' a 1# _ 8 ~ . `~ ~ '$~ ,\ 8 ~~._q $, L:~ ~ Ir . l~' ~ $ w ~, ~J ~\ ~~i•f I I I+ I \ ~ $ 3 ~~~. ~ '. ~. \ ` 8 \ „ L! ~~~ ~ r~ ~~ f~ I I ).~_,i,~ ~r -_ ~ I_ _i. i - i 1- rl)1 t~ll~ as-~ 7` t:',. ~~ r>>~-a~ ,,~ r ; ~/ ~I'E r~11-h;~ ftE. [~[1 kt~G,~lfl rt ~Ta~~ ~~a ~ ~ LF -u tit , i r ~t~. rrr: +r r n ,~~ ~ .:t ~t ~-~;t+/ )rr. ~9 +#~_ ~+ 1 f,ti~ltff Ali -~~t~ rt l~_~tfi filf~l-~i~f I~ 1 (~~E iI~1-~jff t`rl ~' tl({[lLl~i ,,~~ {is ii ~ . s L t ! t , I + ~ ~-t I h i 1 1 ~ I ! !.1.4. r l : _ ' ~ + . 'i y'j~i -r tt r ~'-t. -} . -.. -k )~ t' ~ ±~i~'r+, 1rr~,rft of fftt ,rr# irtl aT i t i! kl~i Illl 1}1i r;r !rti~fk~i ~fC± f ~1t1-)}t tt+-!~}-It t~ ;~t~(r Cf?~ t1~t~1:~~fL~, t(lf+~r~t if[It~I~~iT~~~a~~ IC,i~I~r~ rrl~~~ ~ I: ~...,t I. i , ~. ~ # !ulAl00L)!')4LON/,')4105 ...... ~ ...._ _._~i11 g ~ ~~~~~~eFFF s %.~receY-ACa ~ jc :ssaasa ^` i~3p9:B?S$ •Y 8:888.88888888 ~ $?"~'~F939'~ ww~~ 8'= °:YSB:YYY::iYY ~ ~ 8888888888 ~V ~~ „ zsw ; 8:888888888888 - ~~~~~~ ~/~ :s:::::a::::: V/ - a ; 8 ~ t'O•e i ..~. - k 88'89®7fBH _ 8 ~ i~~Ss` E .9::S88Y::E:: s ; ::s°ssss: ~ m 3i ~ffi 'F~ ~ g~~8• _ :ii8:i3ii¢ssi R g :::~YYY88:::: ce8888EE888E8 i°8~^Aa~:AR• ~ •ssaasosssssa.a _~aa~^a^EE^ee? E.a3i::aEE^e E: _~ .BRRAAA. „R3 $N 8 m 8 N Y~ ,~ : 8 • • are L ~_ ~ C-16B BAG 7 1 /16" 5000 psi. of pipes cross of pipe/slips Blind/Shears TOTs ~ 2 3/8" combi ram/slips ~ 7 1/16" 5000psi Mud Cross I I Mud Cross 7 1 /16" 5000psi variable bore pipe 3 1/2"-2 3l8" TOTs - 2 3/8" combi ram/slips ~ 7 1/16" 5000psi ab Valy Flow Tee • • SONDRA D STEWMAN BP EXPLORATION AK INC ~~Master ~; PO BOX 196612 M8 7-5 card Check ss-sn2sz 145 ANCHORAGE, AK 99519-6612 ~3 -~c~-c~c~ .DATE PAY TO THE ORDER OF ,. First. National "k Alaska ~ CQ~J Anchor a AK 99501 DOLLARS .MEMO 1 U` ~ ~ ~~ ~: 1 2 5 2 0 0 0 6 0 ~: 9 9 14 ~^~ 6 2 2 7 •~~ 15 6 4 ~~^ 0 l45 • • TRANSMITTAL LETTER CHECKLIST WELL NAME -~R~d ~-~~~ PTD# ,~~~'• ~ ~' Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. API No. 50- - - API number are , between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.05. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of welly until after ~Com~any NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/25/06 C:\j ody\transmittal_checkl ist WELL PEttMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 _ PTD#:2060510 ' Company .BP EXPLORAIIQN (ALASKAN-INC ___ ___ _' Initial ClasslType _ __ _ Well Name: _PRUDHOE BAY UNIT C-16B _____Program DEV _ Well bore seg [ _f)EV! PEND___GeoArea Q90 ___ Unit 11650 _ On/Off Shore On __ Annular Disposal Administration ~1 Permit-fee attached____ __________________________________.. Yes ~,2 Lease number appropriate Yes - ',3 Unique well-name-and number - - - - ... _ _ Yes - ~4 Well located in a defined pool - _ _ - _ - _ _ . - . _ _ _ Yes - - . _ _ - - - - ~5 Well located proper distance-from drilling unitboundary - - Yes - - - .. - - ~'6 Well locatedproperdstancef[omotherwells------___ -----------.--- Yes- -- ---.----- ---------------- -- ------- -- -.. ----. 17 Sufficient acreageayail_ableindrillingunit----_--------------____--,_ Yes- - ------- -__ ~8 If deviated, is wellbore platincluded . _ _ - - - . , _ _ _ _ - .. _ _ _ _ - . _ Yes _ - - - - - _ - - ~9 Operator only affected party---- ------ --------------------- _-- Yes_ '110 Operator has appropriate-bond in force. - - - - - - . - - - Yes - - . - - - _ . _ - - - - - - - - - 11 Permit-can be issued without Gonseruation order_ _ - - - - Yes 12 Permit can be issued without administ(ative-approval _ _ - Yes _ _ . - _ _ _ . - - _ _ _ _ _ _ _ _ _ _ _ - Appr Date '~13 Can permit be approved before 15-day wait- - - - Yes - RPC 414/2006 14 Well located within area and strata authorized by Injection Order # (put 10# in-comments)-(For_ NA- - - 15 Allwells-within 1/4-mile area of review identified (For sere-ice well only) - - - - - - - . _ NA- 16 _Pre-pr9duced injector; duration of pre production less than.3 months_(F4r service well only) - NA . - - - ACMP-Finding of Constskency-has been issued-forthis project- - - - - - - - - - - - - - - - - - - NA- _ _ _ _ _ _ _ _ _ - _ - - _ . - - _ . _ ... - _ ~18 Conductor stung provided - - ~. . Engineering ~19 Surface casing protects all known-U$DWs . - NA- - _ 20 CMT-vol-adequate_to circulate.on conductor& surfcsg - - - - - - - - - - - - - - - - - NA_ _ _ _ - - - - - _ X21 CMT vol_ adequate to tie-in long string tosurf csg- - - - - - - - - - - - - - - - - - - - - _ _ ~- - - - - - - - - - - - - - - ~I22 I CMT-will coyer all knownproductiye horizons- - - - _ Yes Adequate excess, !~23 Casing designs adegtate for C,_T, B &-petmaf[ost- - - - - - . Yes - ---------------- 24 Adequate tankage-or reserve pit _ - - - - . - - _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ CTDIJ. - ',25 If a.re-drill, has_a-10-403 for abandonment been approved . - _ - - - - - - - - - - - - - - - - Yes - - _ . _ _ _ _ _ _ _ - _ . _ _ - I26 Adequate wellbore separation.proposed- - - - - - Yes 27 If diverier requrred, does d meet regulatrgns- - - - - . _ NA _ _ - Sidetrack. - 28 Drilling fluid-program schematic_& equip list adequate_ Yes Max AmN 8ai ppg. Appr Date ~29 BOPEs, dothey_meet_regulation - - Yes _ - . WGA 4!512006 30 BOPE-press rating appropriate; test to-(put prig in comments)- _ - Yes .. - - Test to 3500_psi. -tVt$P 2220 psi..... '131 Choke manifold complies wlAPI-RP-53 (May 84)- _ - _ _ - _ _ - - _ Yes - _ _ _ _ _ 32 Work will occur without operation shutdo-wn_ - - . - - - - Yes - - - 33 Is presence of H2S gas probable. NO _ 20 ppm_ max-on pad.- . 34 Mechanical condition of wells within AOR verified (Fo[service well only) - - - - _ NA- - - . - 135 Permit.can be issued wlo hydrogeqsulfide measures No -----. Geology I36 .Data-presented on potential overpressure zones - - - . NA 37 Seismic_analysis-of shallpwgas zones- - - _ _ NA- - _ _ - Appr Date x,38 Seabed condjtion survey.(ifoff-shore) - NA - _ . ... . _ . - RPC 41412006 '139 Contact namelphone for weekly_progress reports-[exploratory only] - - - - - - - - - - - - - - - - NA- Geologic Engineering i Commissioner: Date: Commissioner: Date o is io r Date .. n(s- ---~ f~1~__ -- _- --- ~--.~--off-------- • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efforl has been made 1o chronologically organize this category of information. c-16b.tapx Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Apr 22 15:23:52 2008 Reel Header Service name .............LISTPE Date . ...................08/04/22 Ori in ...................STS Ree~ Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS writing Library. Tape Header Service name .............LISTPE Date .....................08/04/22 Origin ...................sTS Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 2 w-0004391154 s. LATZ J. EGBEJIMBA SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD scientific Technical services scientific Technical services C-16B 500292043802 BP Exploration (Alaska) inc. Sperry Drilling Services 22-APR-08 MWD RUN 3 MWD RUN 4 W-0004391154 W-0004391154 S. LATZ B. JAHN J. EGBEJIMBA R. WHITLOW/ 19 11N 14E 116 1218 61.77 35.18 Page 1 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: c-16b.tapx OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 4.125 7.000 9425.0 8904.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS). 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK IN THE C-16A WELLBORE. THE TOP OF THE WHIPSTOCK WAS AT 9425'MD/8928'TVDSS. THE WHIPSTOCK WAS POSITIONED AND THE WINDOW WAS MILLED DURING MWD RUN 1. NO DATA ARE PRESENTED FOR THIS RUN. 4. MWD RUNS 2,4 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG), UTILIZING SCINTILLATION DETECTORS. UPHOLE SGRD TIE-IN DATA WERE MERGED WITH MWD DATA FROM RUN 2. 5. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). EWR DATA OVER THE RUN 2 INTERVAL WERE ACQUIRED WHILE RIH FOR MWD RUN 3. THESE MAD DATA WERE MERGED WITH THE RUN 3 MWD DATA. 6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED HOLE GAMMA RAY LOG RUN IN C-16B ON 19 MAY 2006. THESE DATA WERE PROVIDED BY D.DORTCH (SAIC/BP) ON 22 FEBRUARY 2008, PER DOUG STONER(BP). LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 7. MWD RUNS 1-4 REPRESENT WELL C-16B WITH API#: 50-029-20438-02. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11465'MD/8952'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. Page 2 c-16b.tapx File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9106.0 11432.5 ROP 9135.5 11462.5 RPX 9424.0 11121.5 RPS 9424.0 11121.5 RPM 9424.0 11121.5 RPD 9424.0 11121.5 FET 9424.0 11121.5 BASELINE CURVE FO R SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 9106.0 9114.5 9118.5 9127.0 9126.5 9135.0 9131.0 9139.0 9133.5 9142.5 9134.5 9144.0 9138.5 9148.5 9140.0 9149.5 9417.5 9416.0 9419.0 9417.5 9420.5 9418.5 9428.0 9426.5 9433.0 9433.5 9434.5 9435.0 9443.5 9445.0 9448.0 9447.5 9466.5 9467.0 9478.5 9479.0 9481.5 9481.5 9487.0 9488.0 9489.5 9490.5 9511.5 9512.0 9518.5 9517.5 9526.5 9526.0 9542.0 9542.0 9546.0 9547.0 9552.5 9554.0 9587.0 9586.5 9592.5 9591.5 9596.5 9595.5 9601.5 9599.0 9609.5 9608.0 Page 3 c-16b.tapx 9612.0 9611.5 9622.0 9622.0 9641.5 9641.0 9660.5 9660.0 9671.5 9671.0 9676.5 9676.5 9678.5 9679.0 9692.0 9692.0 9695.0 9694.5 9699.0 9699.0 9770.0 9772.0 9779.0 9779.0 9821.5 9820.0 9829.0 9828.5 9836.0 9834.5 9845.5 9844.0 9848.0 9848.0 9852.0 9853.0 9856.5 9858.0 9857.5 9859.0 9860.5 9862.0 9864.0 9866.0 9868.0 9870.0 9877.0 9878.5 9905.5 9906.0 9913.0 9911.5 9929.0 9928.0 9937.5 9936.0 9943.5 9941.5 9945.0 9943.0 9949.5 9946.5 9957.0 9954.0 9962.0 9960.0 9963.5 9962.0 9967.5 9966.5 9970.0 9968.5 9976.5 9974.5 9989.5 9990.0 9995.5 9994.5 9998.0 9998.0 9999.5 9999.5 10007.0 10010.5 10010.5 10015.0 10021.0 10024.0 10030.5 10034.5 10031.5 10036.0 10032.5 10038.0 10034.0 10039.5 10044.5 10050.0 10051.0 10056.5 10059.5 10064.0 10074.5 10079.5 10083.0 10086.5 10084.0 10088.5 10090.5 10097.0 10096.0 10102.5 10098.5 10104.0 10107.5 10113.0 10112.5 10118.5 10137.0 10139.5 10140.5 10142.0 10145.0 10146.5 10152.0 10153.5 Page 4 c-16b.tapx 10179.5 10183.0 10193.5 10196.5 10200.0 10202.5 10208.5 10210.5 10216.5 10218.0 10235.0 10234.0 10248.5 10248.5 10257.5 10259.0 10279.0 10279.0 10286.5 10289.5 10288.0 10292.0 10302.0 10306.0 10303.5 10308.0 10310.5 10315.0 10320.5 10325.0 10333.5 10336.5 10341.5 10343.5 10343.5 10345.5 10349.5 10349.0 10355.0 10354.0 10364.0 10363.0 10376.5 10377.0 10409.0 10410.0 10427.5 10433.0 10446.5 10450.0 10452.5 10457.0 10455.0 10461.5 10464.0 10469.5 10473.0 10477.5 10479.0 10483.0 10495.5 10499.5 10499.5 10501.5 10515.0 10517.0 10524.0 10528.5 10528.0 10533.5 10534.5 10539.5 10547.0 10553.0 10562.0 10567.5 10581.0 10586.5 10592.5 10599.0 10595.0 10600.5 10602.0 10605.5 10604.0 10607.5 10610.5 10613.0 10617.5 10621.5 10627.5 10631.5 10639.0 10643.5 10661.5 10669.0 10686.0 10693.5 10714.5 10720.0 10747.5 10756.0 10753.5 10763.5 10762.0 10771.0 10764.0 10773.0 10768.5 10777.5 10774.0 10781.0 10780.0 10787.5 10784.5 10791.0 10788.0 10795.0 10791.5 10799.0 10807.0 10814.0 10817.5 10826.0 10828.0 10834.5 Page 5 c-16b.tapx 10839.0 10846.0 10843.5 10850.5 10851.0 10858.0 10858.5 10863.5 10861.5 10868.5 10879.5 10888.0 10895.5 10902.0 10907.5 10909.0 10910.5 10913.5 10928.0 10932.0 10935.5 10940.5 10943.0 10947.5 10947.5 10952.0 10954.5 10958.0 10959.5 10964.0 10983.0 10986.0 10992.0 10994.5 11006.5 11007.5 11008.0 11009.0 11012.0 11013.5 11030.5 11032.0 11054.5 11055.5 11063.5 11065.0 11068.5 11070.5 11071.5 11074.0 11085.0 11088.0 11094.5 11097.5 11102.5 11105.0 11108.0 11107.5 11112.0 11113.5 11124.5 11122.0 11126.0 11124.5 11130.5 11130.5 11169.0 11171.5 11177.0 11180.0 11179.5 11183.0 11190.0 11194.5 11197.0 11201.0 11270.5 11273.0 11272.0 11274.5 11292.5 11294.5 11317.5 11320.5 11320.5 11324.0 11323.0 11325.5 11462.5 11465.0 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MwD 2 9114.5 9851.0 MwD 3 9851.0 11155.0 MwD 4 11155.0 11465.0 REMARKS: MERGED MAIN PASS. Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Page 6 • ~ s c-16b.tapx Frame Spacing.. ..... ............60 .lIN Max fr ames per record .............undefined Absent value ... ...................-999 Depth Units. .. .. ..... Datum Specifica tion Block sub-type...0 Name Serv ice order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Serv ice unit Min Max Mean Nsam Reading Reading DEPT FT 9106 11462.5 10284.3 4714 9106 11462.5 RPD MWD OHMM 0.44 2000 25.3052 3396 9424 11121.5 RPM MWD OHMM 5.57 2000 20.383 3396 9424 11121.5 RPS MWD OHMM 0.62 2000 19.2053 3396 9424 11121.5 RPX MWD OHMM 0.4 2000 15.9245 3396 9424 11121.5 FET MWD HOUR 0.18 25.24 5.84143 3396 9424 11121.5 GR MWD API 8.89 354.8 65.8245 4142 9106 11432.5 RoP MwD FT/H 0.72 742.22 101.205 4146 9135.5 11462.5 First Reading For Entire File..........9106 Last Reading For Entire File...........11462 File Trailer Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File TyC~e ................L0 Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLI6.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLIB.001 comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 Page 7 c-16b.tapx FI LE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9114.5 9820.0 OP 9145.0 9851.0 $ LOG HEADER DATA DATE LOGGED: 14-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 7.75 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9851.0 TOP LOG INTERVAL (FT): 9425.0 BOTTOM LOG INTERVAL (FT): 9851.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 80.8 MAXIMUM ANGLE: 91.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG002 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 9425.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 8.7 MUD CHLORIDES (PPM): 37500 FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATU RE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMP ERATURE: .000 137.5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Page 8 c-16b.tapx Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MWD020 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9114.5 9851 9482.75 1474 9114.5 9851 GR MWD020 API 16.28 354.8 46.7832 920 9114.5 9820 ROP MWD020 FT/H 8.09 289.09 95.885 917 9145 9851 First Reading For Entire File..........9114.5 Last Reading For Entire File...........9851 File Trailer Service name... .......STSLIB.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical- Record..65535 File Type ................L0 Next File Name...........STSLIB.003 Physical EOF File Header service name... .......STSLIB.003 service Sub Level Name... version Number.. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......ST5LI6.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 9422.0 11120.0 RPM 9422.0 11120.0 RPS 9422.0 11120.0 RPx 9422.0 11120.0 RPD 9422.0 11120.0 GR 9820.5 11110.5 ROP 9851.5 11155.0 LOG HEADER DATA Page 9 c-16b.tapx DATE LOGGED: 15-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE sOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11155.0 TOP LOG INTERVAL (FT): 9851.0 BOTTOM LOG INTERVAL (FT): 11155.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 82.8 MAXIMUM ANGLE: 99.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 82758 EWR4 ELECTROMAG. RESIS. 4 178424 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.750 DRILLER'S CASING DEPTH (FT): 9425.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (s): 46.0 MUD PH: 8.6 MUD CHLORIDES (PPM): 37500 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .110 74.0 MUD AT MAX CIRCULATING TERMPERATURE: .050 161.8 MUD FILTRATE AT MT: .130 73.0 MUD CAKE AT MT: .160 64.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ................ ....-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MWD030 OHMM 4 1 68 4 2 RPM MWD030 OHMM 4 1 68 8 3 Page 10 c-16b.tapx RPS MWD030 OHMM 4 1 68 12 4 RPx MWD030 oHMM 4 1 68 16 5 FET MwD030 HOUR 4 1 68 20 6 GR MwD030 API 4 1 68 24 7 ROP MWD030 FT/H 4 1 68 28 8 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 9422 11155 10288.5 3467 9422 11155 RPD MwD030 OHMM 0.44 2000 27.5793 3397 9422 11120 RPM MwD030 OHMM 5.57 2000 22.0667 3397 9422 11120 RPS MWD030 OHMM 0.62 2000 20.9289 3397 9422 11120 RPx MWD030 OHMM 0.4 2000 16.4837 3397 9422 11120 FET MWD030 HOUR 0.18 25.24 5.87825 3397 9422 11120 GR MwD030 API 8.89 322.97 79.6197 2581 9820.5 11110.5 ROP MWD030 FT/H 1.27 742.22 98.6534 2608 9851.5 11155 First Reading For Entire File..........9422 Last Reading For Entire File...........11155 File Trailer Service name... .......ST5LI6.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.004 Physical EOF File Header service name... .......ST5LI6.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LI6.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11111.0 11435.0 ROP 11155.5 11465.0 LOG HEADER DATA DATE LOGGED: SOFTWARE 18-MAY-06 Page 11 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: ~r c-16b.tapx Insite 7.75 Memory 11465.0 11155.0 11465.0 87.2 91.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 TOOL NUMBER TLG002 3.750 9425.0 Polymer 9.60 65.0 8.9 126500 6.2 .000 .0 .000 162.8 .000 .0 .000 .0 Name Service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 GR MWD040 API 4 1 68 4 2 ROP MwD040 FT/H 4 1 68 8 3 Page 12 c-16b.tapx First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11111 11465 11288 709 11111 11465 GR MwD040 API 20.35 123.39 39.3561 649 11111 11435 ROP MWD040 FT/H 0.72 273.18 119.058 620 11155.5 11465 First Reading For Entire File..........lllll Last Reading For Entire File...........11465 File Trailer Service name... .......STSLI6.004 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/04/22 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.005 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/04/22 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date . ...................08/04/22 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS writing Library. Physical EOF Physical EOF End Of LIS File scientific Technical services scientific Technical services Page 13