Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-009
STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI IN WELLLMPLETION OR RECOMPLETION REP AND LOG 1a. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned RI - Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development a Exploratory 0 GINJ ❑ WINJ 0 WAG 0 WDSPL ❑ No.of Completions: Zero • Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc •10/17/2015 206-009 • 315-508 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 •6/7/2006 50-029-20553-03-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 6/13/2006 PBU G-10C Surface: 2554'FNL,2367'FEL,Sec.12,T11N,R13E,UM ' 17. Field/Pool(s): 9. KB(ft above MSL): 71.16 • Top of Productive Interval: 3886'FNL,3688'FEL,Sec.12,T11N,R13E,UM GL(ft above MSL): 35.49 i PRUDHOE BAY,PRUDHOE OIL • Total Depth: 4812'FNL,2302'FEL,Sec.12,T11N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 9362'/8595' ADL 028280 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 657859• y- 5969088 ' Zone - ASP 4 12057'/9030' • TPI: x- 656567 y- 5967728 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 657972 y- 5966831 Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey: Yes 0 (attached) No m 13. Water Depth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 9468'/8677' • 22 Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/NGP,GR/ROP,MGR/CCL/CNL 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" x 30" 36' 116' 36' 116' 36" 260 sx Arctic Set(Approx.) 13-3/8" 72# L-80 36' 2692' 36' 2692' 17-1/2" 3500 sx AS II,20 sx Top Job 9-5/8" 47# L-80 34' 8255' 34' 7540' 12-1/4" 1100 sx Class'G',140 sx AS I 7" 29# L-80 4149' 9468' 4079' 8677 8-1/2" 1011 sxClass'G' R ECEIVED 2-3/8" 4.6# L-80 9441' 12057' 8657' 9030' 3" 92 sx Class'G' N O V 1 '2 20 1jj 24. Open to production or injection? Yes 0 No RI 25. TUBING RECORD O GCC If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 3-1/2"9.3#L-80 9468' 4074'/4015' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes 0 No Il . SCANNy Per 20 AAC 25.283(i)(2)attach electronic and printed ED • AN' 2 9' 2016 information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 9362' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate �I • Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Sub it ORIGINAL only I/i c— 7-/z/t5,s , eez.,%-- t1BDMSY NOV 1 1 ZU15 28. CORE DATA • Conventional Core(s) Yes 0 No f • Sidewall Cores Yes 0 No 2 • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No IZI Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Sadlerochit-Zone 4 9294' 8539' AAC 25.071. CGL-Zone 3 9485' 8687' Base of CGL-Zone 2C 9622' 8763' 23SB-Zone 2B 9720' 8811' 22TS 9893' 8868' 21 TS-Zone 2A 10023' 8917' Zone 1B 10305' 9014' • Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sperry,Nathan Email: Nathan.Sperry@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: hone: +1 907 564 4091 Date: it/0/15 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only • • G-10C, Well History (Pre-Rig Sidetrack) ACTIVITYDATE I SUMMARY ***WELL SI ON ARRIVAL***(ELINE: WHIPSTOCK) INITIAL T/I/O =200/ 175/0. RU / PT. RIH WITH WHIPSTOCK. GOOD INDICATION OF SETTING. CCL TO TOP OF WS = 15.42'. CCL STOP DEPTH = 9354.58'. TOWS AT 9370'. 178* ROHS. OAL LIH =10.33' DEPTH CORRELATED TO SLB CEMENT EVALUATION LOG DATED 25-FEB-2006. POOH. POOH. RDMO. FINAL T/I/O = 200/175/0 PSI 9/18/2015 ***JOB COMPLETED ON 18-SEPT-2015 *** T/I/O= 155/200/0 MIT-T to 2400 psi ***PASSED*** (Pre CTD) Pumped 5.9 bbls of Meth down TBG to establish test pressure for MIT-T to 2400 psi. 1st 15 min TBG lost 109 psi. 2nd 15 min TBG lost 41 psi for a total loss of 150 psi in a 30 min test, **PASS**. Bled back -2.3 bbls FWHP=154/193/0 SV,SSV,WV=C MV=O IA,OA=OTG AFE sign and tags 9/20/2015 hung Pad Op notified upon departure T/I/O = SSV/160/Vac. Temp =SI. Bleed WHPs to 0 psi (Pre Rig). Swab platform, Flow line and Well house removed. Tree platform installed with no ladder or hand rails. Cross over and Test Spool installed on Swab Valve. Unable to obtain T FL and psi due to removed ladder and hand rails. IA FL near surface. Bleed IAP from 160 psi to 0 psi in 5 mins to BT (gas). IAP increased 10 psi after monitor. Bled IAP from 10 psi to 0 psi in 1 min to BT (gas). IAP increased 4 psi during 2nd monitor. Bled IAP from 4 psi to 0 psi and started open bleed. IAP increased to 2 psi after open bleed monitor. 10/14/2015 SV, WV= Unable to verify. SSV = C. MV= 0. IA& OA = OTG. NOVP. 0015. T/I/0=180/100/0 Installed Nordic TS#05 XO#01 Torqued flange. Job complete, FWP's 10/14/2015 180/100/0 see log or details. • • • North America-ALASKA-BP Page 1 Operation Summary Report Common Well Name:G-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/15/2015 End Date:10/24/2015 X3-0179T-C:(3,727,230.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:3/27/1981 12:00:00AM Rig Release:10/27/2015 Rig Contractor:NORDIC CALISTA UWI:500292055300 Active datum:G-10 A/B/C OKB(g71.16usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/15/2015 14:30 - 19:00 4.50 MOB PRE HOLD PJSM TO MOVE OFF THE WELL CHOCK BLOCKS WILL BE PLACED BEHIND THE RIG TIRES TO PREVENT IT FROM ROLLING BACKWARDS ESD FOR MOVE SYSTEM WILL BE TESTED BEFORE MOVE STARTS AND MANNED BY THE TOOLPUSHER GOOD COMMUNICATION WILL BE ESTABLISHED WITH ALL INVOLVED WITH MOVING OFF THE WELL THE AGREED COMMAND TO STOP WILL BE UNDERSTOOD BY ALL PERSONNEL PULL OFF WELLAND STAGE ON PAD FOR SECURITY AND CREW CHANGE 19:00 - 00:00 5.00 MOIS PRE MOBILIZE RIG OFF L-PAD TOWARDS G-PAD 10/16/2015 00:00 - 10:45 10.75 MOB P PRE CONTINUE MOVING RIG FROM L-PAD TO G-PAD. 09:53 AM SENT UPDATE TO STATE FOR BOP TEST WITNNESS 10:45 - 11:00 0.25 MOB PRE RIG ON G-PAD 10:51 JEFF JONES STATE INSPECTOR WAIVED WITNESS OF OUR TEST 11:00 - 11:15 0.25 MOB PRE RIG ON THE PAD,SPOT T-MATS 11:15 - 11:30 0.25 MOB PRE HOLD PJSM TO SPOT RIG OVER WELL 11:30 - 12:00 0.50 MOB PRE SPOT RIG OVER WELL 12:00 - 16:00 4.00 BOPSUR PRE RIG SPOTTED OVER WELL,ACCEPT RIG AT 12:00 BEGIN RU LTT THE MASTER&SWAB,PASSED MONITOR WELL BETWEEN MASTER&SWAB WITH OOA SENSOR REMOVE TREE CAP NU BOP 16:00 - 18:15 2.25 BOPSUR P PRE INSPECT BOP COMPONENTS 18:15 - 18:30 0.25 BOPSUR P PRE HOLD RIG EVACUATION DRILL AND AAR WITH BOTH CREWS AT CREW CHANGE 18:30 - 21:15 2.75 BOPSUR PRE CHANGE-OUT AND CONTINUE INSPECTING BOP COMPONENTS 21:15 - 00:00 2.75 BOPSUR P PRE PRESSURE TEST BOP PER NORDIC,BP AND AOGCC -HOLD PJSM AND DISCUSS PRESSURE CROSSCHECK CARD -FLUID PACK AND PERFORM BODY TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES -AOGCC WAIVED WITNESS TO TEST VIA EMAIL ON 10/16/2015 AT 1051 HOURS -TEST BOP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES Printed 11/6/2015 3:16:33PM • • North America-ALASKA-BP Page 2 dPt Operation Summary Report Common Well Name:G-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/15/2015 End Date:10/24/2015 X3-0179T-C:(3,727,230.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/me:3/27/1981 12:00:00AM Rig Release:10/27/2015 Rig Contractor:NORDIC CALISTA UWI:500292055300 Active datum:G-10 A/B/C OKB©71.16usft(above Mean Sea Level) Date From-To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/17/2015 00:00 - 05:15 5.25 BOPSUR P PRE CONTINUE TO PRESSURE TEST BOP PER NORDIC,BP AND AOGCC -PERFORM ACCUMULATOR DRAWDOWN TEST -TEST BOP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 05:15 - 06:15 1.00 DOPSUR P PRE TEST INNER REEL VALVE&PACK-OFF -HOLD PJSM FOR RU AND TESTING -PICK UP INJECTOR AND GET ON WELL 06:15 - 07:00 0.75 BOPSUR P PRE PT PACK OFF&INNER REEL VALVE 07:00 - 08:30 1.50 BOPSUR P PRE RD TEST PUMP TEST ALARMS WHILE GREASE CREW IS CHECKING THE TREE BOLTS 08:30 - 08:45 0.25 BOPSUR P PRE PJSM TO PULL THE TEST PLUG,INSTALL NIGHT CAP AND CUT COIL 08:45 - 10:50 2.08 BOPSUR P PRE PULL TEST PLUG INSTALL NIGHT CAP AND TEST RD UQC RU CTC CUT 100'OF COIL REREAD 10:50 - 11:40 0.83 BOPSUR P PRE UQC MADE UP,TEST LINE,GOOD TEST PT CTC AND UQC,GOOD TEST PT BHI UQC FLOATS,GOOD TEST 11:40 - 12:00 0.33 STWHIP P WEXIT HOLD PJSM TO OPEN UP TO THE WELL 12:00 - 12:45 0.75 STWHIP P WEXIT OPEN WELL TO A CLOSED CHOKE NO PRESSURE,FILL THE HOLE HOLE IS FULL AFTER 7 BBLS,FLOW CHECK FOR 10 MIN 12:45 - 13:00 0.25 STWHIP P WEXIT GOOD NO FLOW,HOLD PJSM TO MU THE WINDOW MILLING BHA 13:00 - 15:30 2.50 STWHIP P WEXIT BHA MU,STAB ON RIH TAKING ALL RETURNS THROUGH THE CHOKE AND OUT TO THE TIGER TANK *****BLACKED OUT RIG WHILE RIH ON 1 MOTOR AGAIN***** 15:30 - 16:00 0.50 STWHIP P WEXIT LOG TIE IN 16:00 - 17:00 1.00 STWHIP P WEXIT CORRECT DEPTH-6.5' RIH TO TOWS AND DISPLACE THE COIL AND WELL TO MUD 17:00 - 17:45 0.75 STWHIP P WEXIT WELL SWAPPED TO MUD,CLOSE THE EDC, ORIENT TO LOWSIDE,OBTAIN SPR'S AND TAG PINCH POINT TAG PINCH POINT AT 9365.5' PU AND START THE MOTOR 17:45 - 20:00 2.25 STWHIP P WEXIT TAG PINCH POINT AT 9365.0'AND BEGIN MILLING 2.74"WINDOW -TIME MILL-1/10'6 MINUTES 61.01) -FREESPIN-3300 PSI AT 1.66 BPM -MOTORWORK-150 PSI -WOB-2-2.5K 20:00 - 22:30 2.50 STWHIP P WEXIT CONTINUE MILLING 2.74"WINDOW -TIME MILL-1/10'6 MINUTES -FREESPIN-3300 PSI AT 1.66 BPM -MOTORWORK-150 PSI -WOB-2-2.8K Printed 11/6/2015 3:16:33PM ` • • North America-ALASKA-BP Page 3 ik Operation Summary Report Common Well Name:G-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/15/2015 End Date:10/24/2015 X3-0179T-C:(3,727,230.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/me:3/27/1981 12:00:OOAM Rig Release:10/27/2015 Rig Contractor:NORDIC CALISTA UWI:500292055300 Active datum:G-10 A/B/C OKB @71.16usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 STWHIP P WEXIT CONTINUE MILLING 2.74"WINDOW -TIME MILL-1/10'6 MINUTES -FREESPIN-3300 PSI AT 1.66 BPM -MOTORWORK-150 PSI -WOB-2-3.3K 10/18/2015 00:00 - 04:30 4.50 STWHIP P WEXIT CONTINUE MILLING 2.74"WINDOW -EXIT 3.5"AND ROP DROPS;APPLY MAX WOB,ALLOW TO MILL DOWN AND CONTINUE -FREESPIN-3300 PSI AT 1.66 BPM -MOTORWORK-150 PSI -ROP HOLDING-2/10'PER HOUR ON MAX PARAMETERS 04:30 - 06:00 1.50 STWHIP P WEXIT CONTINUE MILLING 2.74"WINDOW -TIME MILL-1/10'6 MINUTES -FREESPIN-3300 PSI AT 1.66 BPM -MOTORWORK-150 PSI -WOB-2-4K 06:00 - 08:30 2.50 STWHIP P WEXIT VERY SLOW ROP MILLING ON 7" 08:30 - 10:00 1.50 STWHIP P WEXIT EXIT THE BOTTOM OF THE WINDOW,7.2' WINDOW LENGTH MILL 1'AT SAME RATE TO CLEAN UP THE BOTTOM OF THE WINDOW WITH THE STRING MILL THEN DRILL 10'OF RAT HOLE BASED ON WOB AND DIFF PRESSURE 10:00 - 10:55 0.92 STWHIP P WEXIT DRILL 10'OF RAT HOLE 10:55 - 11:10 • 0.25 STWHIP P WEXIT NOT MAKING MUCH PROGRESS WITH THE RAT HOLE,PU AND CHECK ALL THE PARAMETERS WOB IS OFF+0.65K REZERO,INCREASE RATE TO 1.75 BPM FREE SPIN AT 3483 PSI 11:10 - 13:00 1.83 STWHIP P WEXIT BACK ON BOTTOM WITH THE SAME RESULT'S WOB=3.49K MAX=3.80K 220 PSI MOTOR WORK PUMP A20 BBL HIGH VIS PILL BOTTOMS UP SAMPLE SHOWS 95%METAL 2%SAND AND 3%CMT RAT HOLE DRILLING IS VERY SLOW WITH MAXED OUT ON WOB,TRIED MAX AND REDUCED RATES BUT NOT MAKING A DIFFERENCE NOT SEEING MUCH IN THE FORM OF FORMATION COMING BACK BUT THOS IS NORMAL WITH VERY SLOW ROP 13:00 - 14:20 1.33 STWHIP P WEXIT MAXIMUM WINDOW LENGTH TO BE 6.35'+ 9365=9371.4' WE ARE AT 9378.7'OR 7.3'PAST THAT DEPTH DD SAYS HE HAS ENOUGH RAT HOLE TO GET KICKED OFF,DISCUSS WITH ODE AS WELL 7.3'IS ENOUGH RAT HOLE,DRESS&DRY DRIFT WINDOWAS PER PLAN HIGH VIS PILL RAN OFF THE END OF THE SHAKER NOTHING TO COLLECT FOR A SAMPLE MADE 3 PASSES AND DRY DRIFTED CLEAN IN BOTH DIRECTIONS FLOW CHECK WELL WHILE OPENING THE EDC AND POOH Printed 11/6/2015 3:16:33PM TIS= 31/8"FMC W/4"QUW -I U GLEG 4 460'GLE<70 @ 10203*** VM3LHEAD McEVOY ACTUATOR AXELSON OfB.ELEV= 65.3' BE ELEV= — 32.27' KO_P=-- - 3205' ' ; l' —1---- 1 Q . 2201' H 3-1/2"HES XBD SSSV LAND NIP D=2.75" Max Angle= 97"@ 11268' Datum MD= 9899' 2604' H9-5/8"DV PKR Datum TVD: 8800'SS GAS LFT MANDRELS 13-3/8"CSG,72#,BUTT,D=12.347" H 2686' ST MD TVD DEV TYPE VLV LATCH PORT DATE I U 2 3918 3878 27 FMHO DMY RK 0 01/30/06 1 4039 3986 30 FMHO DMY RK 0 06/25/15 Minimum ID = 1.920" @ 9448' TOP OF 2-3/8" LNR x 4073' —9-5/8"X 3-1/2"BKR SABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY,13=3.93" TOP OF 7"SCAB LNR H 4149' 4149' H9-5-8"X 7"BKR TIEBACK,D=7.5" 415T H9-5/8"X 7"BKR LIP w/HGR,D=6.187" 7"LNR LEA KNG(06/23/95 DRLG RPT) H —4160'-—4219' — 8064' H 9-5/8"X 7"BKR HP LTP w/,SACK TOP OF 7"LNR —I 8064' '' SLV,D=6.25" 7"SCAB LNR,29#,L-80 NSCC,.0371 bpf,D=6.814" 8064' C,1 1.1 1---I $077' —�9-518"X 7"HMC HGR,D=6.187" 9-5/8"CSG,47#,L-80 BUTT,D=8.681" —I —8255 J 9-5/8" MLLOUT WNDOW(G-10A) 8255- ' 4-1/2"WHPSTOCK H 9362' TOP OF 2-3/8"LNR —I 9441' ' 9441' —I2-318"BKR DEPLOY SLV,D=2.250" F 7"LNR,29#,L-80 NSCC,.0371 bpf,ID=6.184" H —946$ H TOP OF CEMENT(06/14/06) 4 3-1/2" FD LSX WHPSTOCK(05/20/06) —I 9468' .� 4 Wi''.� ■ N 7"MLLOUT WNDOW(G-10C) 9468'-9480' w/RA TAG @ 9476' s, '" 3-1/2"TBG,9.2#,L-80 EUE 8RD,.0087 bpf,D=2.992" H —9468 3-1/2"WFD CBP(04/07/06) —I 9485' 1197W —FISH:CBP 4-1/2"LNR 12.6#,L-80 — 11170' NSCT, D=3.83" .' —MLL® (07/12/14) A PERFORATION SUMMARY REF LOG: PCNL ON 06/16/06 ANGLE AT TOP PERF: 88'@ 10500' Note:Refer to Production DB for historical perf data PBTD H 12021• SIZE SPF NTERVAL OPN/SQZ DATE SQZ 1-9/16" 6 10500-10900 0 06/16/06 2-3/8"LNR,4.6#,L-80 STL, H 12057' 1-9/16" 6 11300-11850 0 06/16/06 .0039 bpf,D=1.995" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/81 N-22E ORIGINAL COMPLETION 08/11/14 PJC LNR/TBG/MLLOUT UPDATES WELL: G-10C 06/25/95 D-14 SIDETRACK(G-10A) 06/08/15 CRR/PJC 7"LNR LEAKING @ 4160'-4219' PERMT No: 2060090 06/30/02 JLM/KK CTD SIDETRACK(G-10B) 07/02/15 SWC/JMC GLV C/O(06/25/15) AR No: 50-029-20553-03 06/17/06 NORDIC1 CTD SIDETRACK(G-10C) 07/29/15 CRR/PJC 7"LNR HOLES UPDATE SEC 12,T11 N,R13E,2553'FNL&2367'FEL 12/18/12 JGUJMD SET WFD CIBP(12/11/12) 07/14/14 RM-KIM]MLLED&PUSH®CBP(7/12/14) BP Exploration(Alaska) ti Or Tit IV7 ‘vTHE STATE Alaska Oil and Gas fALASI�; - ' Conservation Commission _- oAn�-- 'Oat = 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 OF rhv Main. 907.279.1433 ALASy' Fax 907.276 7542 www.aogcc.alaska.gov John McMullen SC Engineering Team Lead , o _ °Q I BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-10C Sundry Number: 315-508 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P oerster Chair DATED this I day of September,2015 Encl. RBDMS SEP 0 3 2015 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM IN APPLICATION FOR SUNDRY APPRO\.,-S 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations o Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 SuspendO '2t* it/4' Perforate ❑ Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 206-009 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0. 99519-6612Stratigraphic 0 Service ❑ 6. API Number: 50-029-20553-03-00 7, If perforating: 8. Well Name and Number What Regulation or Conservation Order governs well spacing in this pool? Yes 0 No 0 PBU G-10C =#, 1 Ta Will planned perforations require a spacing exceptionS 'ice t; „ D 9. Property Designation(Lease Number): 10 Field/Pools: A I i i_, 1 Vi .01b. ADL 028280 • PRUDHOE BAY,PRUDHOE OIL Or5 Th 11 5 11. PRESENT WELL CONDITION SUMMARY t 0"t'tj Total Depth MD(ft): Total Depth ND(ft)' Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured):�✓ 12057 9030 12021 9030 None 11978 Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"x 30" 36'-116' 36'-116' Surface 2656' 13-3/8" 36'-2692' 36'-2692' 4930 2670 Intermediate 8221' 9-5/8" 34'-8255' 34'-7540' 6870 4760 Liner 5319' 7" 4149'-9468' 4079'-8677' 8160 7020 Liner 2616' 2-3/8" 9441'-12057' 8657'-9030' Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade. Tubing MD(ft)• 10500'-11850' 9035'-9031' 3-1/2",9.3# L-80 9468' Packers and SSSV Type. 5"Baker SB-3 Packer Packers and SSSV MD(ft)and ND(ft): 4074'/4015' No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal m 13.Well Class after proposed work: BOP Sketch RI Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development I? Service 0 14.Estimated Date for Commencing Operations: October 1,2015 15 Well Status after proposed work: , Oil 0 Gas 0 WDSPL 0 Suspended RI' 16 Verbal Approval' Date: WINJ 0 GINJ 0 WAG 0 Abandoned o Commission Representative' Op Shutdown 0 GSTOR 0 SPLUG 0 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sperry,Nathan Email Nathan.Sperry@bp.com Printed Name John M/ u1 Title Engineering Team Lead pf, i Signature i4, Phone 907-564-4711 Date Q COMMISSION USE ONLY (J Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 3t5- 5o v Plug Integrity 0 BOP Test 17 Mechanical Integrity Test 0 Location Clearance 0 Other: 5JA t6-5 2 to 3 50o r 5-/ �`�/)Sp Is Z H-7-C /7 -, / r)r1vlcr pi e-v, r51 to ZSoc, pc.--t ='ilftYr-ZGfr Riv j piAGT`vtYk-) t a./21.7N-a✓terpr•r ao -4-4-C Z5--. / / Zlc i Spacing Exception Required? Yes 0 No Id Subsequent Form Required. /(j — 4 9- APPROVED BYTHE Approved by(4"(t-il /3 1 5— COMMISSIONER COMMISSION Dat_/—/S/ ORIGINAL Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. .. — Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission N From: Nathan Sperry PO t' b CTD Engineer /�N\ Date: August 18, 2015 Re: G-10C Sundry Approval Sundry approval is requested to plug the G-10C perforations as part of the drilling and completion of proposed G-10D coiled tubing sidetrack. History and current status: G-10C was a coil tubing sidetrack drilled in 2006 and completed with 950' of perforations in Z1 B. The initial gas and oil rates were 1.5mmcfd and 4000bopd. Within a few months gas rate increased to 20mmcfd and the oil rate dropped to 700 bopd. A CIBP was set in 12/12 to shut-in the toe. There are no additional wellwork options for this bore and the well is ready for sidetrack. Proposed plan: G-10D will exit from well G-10C by the Nordic 1 Coiled Tubing Drilling rig on or around November 1, 2015. The G-10D sidetrack will exit through the existing 3-1/2" tubing and 7" liner and kick off in the Shublik, and target Zone 1B and 2A reserves. The proposed sidetrack is a —3,250' Ivishak Zone 1 B/2A producer, which will access a —35 acre Z1A reserves target. The lateral will be completed with a 2-3/8" L-80 liner which will be fully cemented and perforated. This Sundry covers plugging the existing G-10C perforations via the G-10D liner cement job or a liner top packer if liner lap test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. )� G 04 Cohc G/r y r /(v y r4 �o/ Noy.; 1,1 rt (PCic" C(A.A p / !� " 7 'Mr/ 4t %9 lec(e651/991 -�r cJ!drill f4 O t/' r o f i 6� Me, p°d i - ,4 /i Pre-Rig Work(scheduled to begin October 1st,2015) 1. E Set 3-1/2"Whipstock at 9370' ELMD and 180 deg ROHS TF • 2. F MIT-T to 3,000 psi. 3. V PT MV, SV, WV. Set and leave TWC if MIT-T failed. 4. 0 Remove wellhouse and level pad. Z4 -O PS Rig Work(scheduled to begin November 1st,2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP X238 psi) 2. Mill 2.74" dual string window and 10' of rathole. 3. Drill build: 3.25" OH, 668' (15 deg DLS planned). 4. Drill lateral: 3.25" OH, 2,563' (12 deg DLS planned). 5. Run 2-3/8" L-80 liner leaving TOL at 9,340' MD. 6. Pump primary cement job: 21 bbls, 15.3 ppg, TOC at TOL.* 7. Perform liner lap test to 2,400 psi 8. Set 35KB LTP if liner lap test fails. * 9. Freeze protect well to 2,500' MD. 10. Set TWC, RDMO. Post-Rig Work 1. 0 Re-install wellhouse, flow line, and pull TWC. 2. C Run GR/CCL/RPM. 3. C Perforate -200' based on log interpretation. 4. S Set GLV's. 5. 0 Test Separator. *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Nathan Sperry CTD Engineer 564-4258 CC: Well File Joe Lastufka Loepp, Victoria T (DOA) From: Sperry, Nathan <Nathan.Sperry@bp.com> Sent Monday,August 31, 2015 11:11 AM To: Loepp,Victoria T(DOA) Cc: Lastufka,Joseph N Subject: RE: PBU G-10C(PTD 206-009, Sundry 315-508), PBU G-10D(PTD 215-149) Good morning Victoria, 1. This was a typo. There's no reason why they should be different. The correct value is 2470 psi. 2. The 74 sacks indicated on the PTD was incorrect. The correct value for 21 bbls is 102 sacks. Please let us know if you need any additional information. Regards, Nathan Sperry Drilling Engineer 0: 907-564-4258 C: 907-268-8416 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@ alaska.gov] Sent: Monday, August 31, 2015 9:51 AM To: Sperry, Nathan Subject: PBU G-10C(PTD 206-009, Sundry 315-508), PBU G-10D(PTD 215-149) Nathan, 1. Why is the MPSP for the plug for redrill 3238 psi and the MPSP for the redrill 2470 psi? 2. Could you please provide the cement calculations for the production liner?The yield seems to be off. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp aa.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepe@alaska.gov 1 TRS 3-118"FMC W/4"QU f 4 O DONOTES:WELL 94ANGLE<70 @ 10203`*' Mc WaLi-EAD EVOY ACTUATOR AXELSON OKE.BEV= 65.3' I I BF.ELEV= 32.27' KOP= 3205' _"CONDUCTOR I 2201' H 3-1/2"HES XBD SSSV LAND NNP,D=2.75" Max Angle= 97"@ 11268' #, Datum MD= _ 9899' D= • .. 2604' H 9-5/8"DV PKR Datum TVD: 8800'SS 7 GAS LFT MANDRELS 13-3/8"CSG,72#,N-80,D=12.347" H 2686' ST MD TVD DEV TYPE VLV LATCH FORT DATE • In 2 3918 3878 27 FM-1O OMY RK 0 01/30/06 1 4039 3986 30 FM-1O MY RK 0 06/25/15 Minimum ID = 1.920" @ 9448' TOP OF 2-3/8" LNR X ><- 4073' H9-5/8"x 3-1/2"BKRSABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY,ID=3.93" TOP OF 7"SCAB LNR -I 4149' -i-,_:—___1 4149' H 9-5-8"X 7'BKR TACK,D=7.5" ': 4157' -I9-5/8"X 7"BKR LTP w/HGR,D=6.187" 7"LNR LFAKNG(06/23/95 DRLG RFT) -I -4160' --4219' TOP OF 7"LNR H 8063' 8063' -17" BKR TEBACK SLV,ID=6.25" 7"SCAB LNR,29#,L-80 NSCC,.371 bpf,ID=6.814" -I 8064' 94 8072' -19-5/8'X 7'BKR TEBK SLV,D=6.187" L 9-5/8'CSG,47#,L-80 BUTT,D=8.681" H -8255 J ri 9-5/8" MILLOUT WNDOW(G-10A) 8255'- ' I TOP OF 2-3/8"LNR --I 9441' 9441' H 2-3/8"BKR DEPLOY SLV,D=2.250" 7"LNR,29#,L-80 NSCC,.0371 bpf,D=6-184" -I -9468 ; ; 9441H TOP OF CEMENT(06/14/06) 4 \ 3-1/2"WFD LSX WHFSTOCK(05/20106) -I 9468' ,�,`\` '4WINDOW, 7'MLLOUT WINDOW(G-10C) 9468'-9480' w/RA TAG@ 9476' ■ `� `� _ 3-1/2"TBG,9.2#,L-80 EUE BRD,.0087 bpf,ID=2.992" H -9468 F...1 s, 3-1/2"WFD CEP(04/07/06) -I 9485' ,A, , .0.%1\\ .4..00111. 1 //) ' i0�!r�i1 11978' -FISH:CEP 4-1/2"LNR,12.6#,L-80 - 11170' j/;slooir! NSCT, ID=3.83" •;iiia,j�.� • -MILLED •11 1.gr.e ■ (07/12/14) Tyr ■ PERFORATION SUMMARY RE=LOG: MCNL ON 06/16/06 ANGLE AT TOP PERE: 88"@ 10500' ;��` Note:Refer to Production DB for historicalrf data Pe PBTD H 12021' SIZE SFF INTERVAL OPN/SOZ DATE SQZ 1-9/16" 6 10500-10900 0 06/16/06 2-3/8"LNR,4.6#,L-80 STL, H 12057' 1-9/16" 6 11300-11850 0 06/16/06 .0039 bpf,D=1.995" DATE REV BY COMENTS DATE REV BY COMMENTS PRUDHOE BAY UNR r 04181 N-22E ORIGINAL COM PLETION 08/11/14 PJC LNR/TBG/MLLOUT UPDATES WELL: G-10C 06/25/95 D-14 SIDETRACK(G-10A) 06/08/15 CRR/PJC 7"LNR LEAKING @ 4160'-4219' PERMIT Nb:'2060090 06/30/02 JLM/KK CTD SIDETRACK(G-10B) 07/02/15 SWC/JIvC GLV CIO(06/25/15) API No: 50-029-20553-03 06/17/06 NOROIC1 CTD SIDETRACK(G-10C) SEC 12,T11 N,R13E,2553'FNL 8 236T FEL 12/18/12 JGUJMO SET WFD CEP(12/11/12) 07/14/14RM-VJMJ MILLED&RUSHED CEP(7/12/14) BP Exploration(Alaska) TREE= 3-1/8"FMCWf4"CIU ... • �VV�L-EAD ldtEVOY G-1 OD I. --DOGLEG 460 aE<70 10203 ACTUATOR-_.__ AXELSON� 4 OKB.ELEV: 65.3' • 1 BF.ELEV= 32.27' ROP-=:- ----- _ _3205' __'CONDUCTOR 'r Oi I 2201' - 3-1/2"HES XBD SSSV LAND NP.-D-=-2-.T51' I x Angle= 97"t 11268' q,-, Datum MD= 9899' D. • ,-!2604' H9-5/8"DV FKR Datum TVD' 8800'SS GAS LFT MANDRELS 13-3/8"CSG,7211,N-80,D=12.347" H 2686' , ]ST MD TVD DEV TYPE I VLV LATCH PORT DATE • LI 2 '3918 3878 27 FWD f DMY RK 0 01/30/06 1 4039 3986 30 FMHO 1 DMY RK 0 06/25/15 X I 4073' -19-5/5"X 3-1/7 BKR SABL-3 FKR W/KBH-22 ANCHOR SEAL ASSY,D=3.93" TOP OF 7"SCAB LNR H 4149° 4149' H 9-5_8"X 7'BKR T1IEBACK,D=7.5' 6.....„..1 7'LNR LEAKNG(06/23/95 DRLG oi 4157' --19-5/8-X 7"BKR LTP w/HGR,CI=6.187" R� --I -4160'--4219' !TOP OF 7'LNR H 8063' 8063' -17" BKR TIEBACK SLV,ID=6.25" 7'SCAB LW,291,L-80 NSCC,.371 bpf,D=6.614" H 8064' I f,_______�^ { 8072' -9-5/8'X 7"BKR TEBK SLV,D 6.187" 9-5/8'CSG,471,L-80 BUTT,D=8_BBi' -E- -8255 } 9-5/8' MLLOIIf WNOOW(G-10A) 8255'- ' 3-112"packer WS set at 9370' ELMD and 90 deg LOHS TOL to 9340'MD.TOC to TOL. RA Marker depth TBD 36 deg INC lb* a TOP OF 2-3/8'LNR - 9441' ( 011 2-3/8"L-80 liner to 12621'MD TD 7'LNR29o1/,L-80 NSCC,.0371 Wbpf,D=6.184' I—l --9468 ; `° •• I3-1/ 2" FD LSX WHFSTOCK(05/20/06) R... 9468° I. r v s' 9441' -I2-3/8"BKR OEFLOY SLV,D=2250' 1wIRA TAG 9476' I III 9441' -{TOP OF CEMENT(06/14/06) • 3-1/2"TBG,9.21,L-80 EUE 8F113,.0087 bpf,D=2.99T - --9468 `%' 3-112"WFD CEP(04107/06) H 9485' ,I 4-1/2"LNR 12.6#.L-80 -j 11170' : 4/s rrrrri i 11978' F6Ft CEP NSCT, D=3.63" 4tiii�rrristo `> ■ -MLLED -4,00-10,4,- .000, U (07112/14)r : •rr ■ AAA PERFORATOON SUMMARY REF LOG: MCI.ON 06/16/06 I A NGLE A T TOP PERF: 88'@ 10500' Note:Rater to Production OB for historical pert data SIZE SPF INTERVAL I OtN/SQZ DATE SQZ 7 4t�' 1-9/16" 6 10500-10900 0 06/16/06 r 1-9/16' 6 11300-l1850+ 0 06/16/06 j PBTD J-i 12021' 2-3/8"LNR 4.6#,L-80 Sit, 12057' .0039 bpi,D=1.995" DATE REV BY COMMBJTS ' DATE REV BY] COMMENTS PRIJDHOE BAY UNIT r 04181 N-22E ORIGINAL COMPLETION 08/11/14 PJC URI TBG/I&.LOUT UPDATES WELL: G-10C 06/25195 D-14 SIDETRACK(G-10A) 06/08/15 CRR/PJC/7"LNR LEAKFIG @ 4160'-4219' PRAT Pb:'1060090 06/30/02 JLM/KK CTD SIDETRACK(G-108) 07/02/15 SW1C/JMC GLV C/O(06/25/15) API No: 50-029-20553-03 06/17/06 NORCIC1 CTD SIDETRACK(G-10C) SEC 12,T11 N,R13E,2553'PNL&2367'FR 12/18/12 JGUJMD SEE VVFD CEP(12/11/12) 07/14/14 RMWJLC kl_LED&RUSHED CEP(7/12/14) BP Exploration(Alaska) giii Ill .i-i.. m LI-I a cc U $ 2 5 Se N 'I' 7 ~ ill X m_0 V f 2. a iv0 u u 2 3 cIoaIii 11111 7 d a I f Illeili Ill) III°I m m U g m U$ $ 0., g m ., Q o V 0 a m o 4 < �A; "o. 1 t 0 ,-•� I H 1 11. 1 o '111 I II : I it C I OR" ^ o I Y Ilii III LL III g 1 ' i a 0 0 . z I o E I c4 111 'i i111 III Q II U m 2 I 111 111 Z I i. `` 1111 1 _ 0 111 111 Q I � J 0 p 1 it:fE 1 ... 0 a IC of 1-;0 in rc ' z 1111 1 j H • i _ II * II: * :I: Ia Ia J I 11a E a. pli ti U.1 ILI IP a u f f re el I Y I F5 10 Oil 1 v 11 w 2 U C� d K am Ce or:— ill % . ---, Q Ee- I— ga. N am H� Q I mg 0 V 1 c2 1 I - �— U I • I i o m 1 w O o' I al 11111 ¢ Z - a I E _ n I 1•11 � G 111 K 9 III 0a 1I 2 sil las S c ^� Iiiiiiiiriiimos I i ,I P u 1 q,g n 1 MI 111 go K Co-) 1 y rl=itii 0 I u j Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" ,------ / boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on ---,- both 'both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q ~ - Q ~ ~ Well History File Identifier Organizing (done> ^ Two-sided III 111111 II II I II III ^ Rescan Needed III 111111 II II III III RESCAN DIGITAL DATA OVERSIZED (Scannable} ~lor Items: Diskettes, No. ` ^ Maps: ^ Greyscale items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: BY: Maria Date: ~ D ^ Other:: /s/ Project Proofing III 111111 II III II III BY: Maria Date: /s/ i P ti S 30 ~ = ~ + ~ =TOTAL PAGES ~ (P cann ng repara on ,_ x o / (Count does not include cover sheet) BY: Maria Date: 17~ ~ ~ ,.LJ/~Q /sl Production Scanning Stage 1 Page Count from Scanned File: _ (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~/~ 0 ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. (I I II I) II I (I II I I III Rescanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III II'III III II'I III 10/6/2005 Well History File Cover Page.doc >nCI L;LIVED STATE OF ALASKA JAN 18 2013 KA OIL AND GAS CONSERVATION COMION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1. Operations Abandon LJ Repair Well L1 Plug Perforations 12j Perforate U Other L1 Performed: Alter Casing ❑ Pull Tubing0 Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeII❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name. BP Exploration (Alaska), Inc Development El Exploratory ❑ J 206 -009 -0 3. Address: P.O. Box 196612 Stratigraphic0 Service ❑ 6. API Number: Anchorage, AK 99519 -6612 ' 50- 029 - 20553 -03 -00 7. Property Designation (Lease Number): 8. Well Name and Number: r ADL0028280 PBU G -10C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 12057 feet Plugs measured 11250 feet true vertical 9029 feet Junk measured None feet Effective Depth measured 11250 feet Packer measured See Attachment feet true vertical 9034.47 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 81 20" x 30" 29 - 110 29 - 110 0 0 Surface 2658 13 -3/8" 72# L -80 28 - 2686 28 - 2685.84 4930 2670 Intermediate None None None None None None Production 9593 9 -5/8" 47# L -80 27 - 9620 27 - 8761.86 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10500 - 10900 feet 11300 - 11850 feet True Vertical depth 9035.45 - 9034.21 feet 9029.83 - 9031.04 feet Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.3# L -80 26 - 9468 26 - 8676.84 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured). 2013 Treatment descriptions including volumes used and final pressure: SCANNED MAR 0 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 437 22392 12 0 1037 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development El — Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil - IO Gas ❑ WDSPII1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s • b..com Printed Name Nita Summe ay Title Petrotechncial Data Technician dYiiiIL %rIt� ./.� -�_ , . ��, , ��� Phone 564 -4035 Date 1/17/2013 RBDMS JAN . Z013C23E VI- F 2/' 7 V/ 3 Form 10-404 Revised 10/2012 /e #4s' Submit Original Only • Daily Report of Well Operations ADL0028280 CTU 8 w/ 1.5" CT. Scope; Set CIBP Rig up. Function test BOPs. MU and RIH w/ BHA; 1.69 ctc,1.70" crossover, 1.75" dfcv, two 1.75" stingers, 1.75" nozzle (oal= 9.41') 12/10/2012 **job in progress ** CTU #8 w/1.50" tapered string .109 " - .134" wall. Job Scope: Set CIBP for,water shut off. «InterAct Publishing» RIH w /PDS GR /CCL for depth control in setting of CIBP Log from 9 p 9 9 12/11/2012 11600 - 10900' Painting flag at 11150' POOH ...Job in progress... CTU #8 w/1.50" tapered string .1 0 F -.¶34" wall. Job Scope: Set CIBP for water shut otf. «InterAct Publishing» RIH w /PDS GR /CCL for depth control in setting of CIBP Log from 11600 - 10900' Painting flag at 11150' POOH Depth corrolation found a xx' correction. RIH w/ Weatherford 1.69" MHA w /blank sub, x -over, ball lock diverter sub, hydraulic setting tool, 2 3/8" CIBP setting addapter, 1.75" OD CIBP OAL = 11.08' Stop at flag and adjust depth to center of element on CIBP Set 2 3/8" CIBP @ 11250' Top of CIBP © 11249.4' 12/11/2012 POOH. ** *Job Complete * ** FLUIDS PUMPED BBLS 64 60/40 METH 64 TOTAL . • S Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription G -10C PACKER 4072 3943.42 3 -1/2" Baker Liner Top Packer G -10C PACKER 4157 4015.65 7" Baker Packer G -10C PACKER 8072 7305.9 7" Baker Packer Casing / Tubing Attachment ADLOO2828O Casing Length Size MD TVD Burst Collapse CONDUCTOR 81 20" x 30" 29 - 110 29 - 110 LINER 3915 7" 29# L -80 4149 - 8064 4079.22 - 7369.13 8160 7020 LINER 1404 7" 29# L -80 8064 - 9468 7369.13 - 8676.84 8160 7020 LINER 2616 2 -3/8" 4.6# L -80 9441 - 12057 8657.23 - 9029.81 11200 11780 PRODUCTION 9593 9 -5/8" 47# L -80 27 - 9620 27 - 8761.86 6870 4760 SURFACE 2658 13 -3/8" 72# L -80 28 - 2686 28 - 2685.84 4930 2670 • TUBING 9442 3 -1/2" 9.3# L -80 26 - 9468 26 - 8676.84 10160 10530 • 1 I f 'TREE = 3-1/8" FMC W /4" QU Y NOTES: SEE PREVIOUS WB.LBORE • 11 FOR MORE DETAILS ON PARENT WELL '" WELLHEAD= McEVOY ACTUATOR= AUCB_SON G -1 O C AND PREVIOUS SIDETRACKS (G-10A & G-10B) 70° @ 10169' KB. ELEV= 70.3' BE B_EV = 3217' KOp_ 3205' 2201' — j 3 HES XBD SSSV LAND MP, ID= 2.75" Max Angie = 97° 11268' Datum MD = 989g I 2604' — 19 - 518" DV PKR Datum TVD = 8800' SS GAS LFT MAMDRELS 13 -3/8" CSG, 72#, N-80, D= 12,347" H 2686' ■ ST MD TVD DEV TYPE VLV LATCH FORT DATE LI 2 3918 3878 28 FM DMY FCC 0 01/30/06 1 4039 3984 30 FM-10 SO FE 20 06/23/06 4072' — 9 -5/8" X 3 -1/2" BKR SABL -3 PKR I TOP OF 7" SCAB LNR - -I 4149' I W /KBH -22 ANCHOR SEAL A SSY , D = 3.93" 4157 H 9-5/8" X 7" BA KER LNR FKR D = 6.187" Minimum ID = 1.920" @ 9448' TOP OF 2-3/8" LNR II I 17" SCAB LNR, 29#, L -80, .371 bpf, D = 6.814" 8064' I H TOP OF 7" LNR 8064' 7 �� 8072' -- I 9- 518" X 7" BAKER LNR PKR, D = 6.187" H •' 7 9441' H2 -3/8" BKR DEPLOY SLV, D = 2.250" 1 ,7 ( / 0 9441' — TOP OF CEM3sIT (06/14/06) 1 ( ' , ( 13-1/2" WFD LSX WHIPSTOCK (05/20/06) (--I 9470' / , 4 1�, \\ ♦ , MILLOUT WINDOW (C-1 0C) ■ RA TAG H I , ` 9470' - 9480' 13-1/2" WFD CBP (04 /07/06) H 9485' ' , ■ I TOP OF 2 -3/8" R I 9498' � LN • 19 -5/8" CSG, 47 #, L -80, D = 8.681" I I 8260' e , s I3 -1'2" TBG, 92#, L -80 NSCT, D = 2.992" I 9788' 7" LNR, 29#, L -80, D = 6.184" H 10235' � „rte .0, L 112 J— IWFDCBP(12/11 /12) I o r 4 -112" LNR, 12.6 #, L-80 11170' m/ /Igo inn /� NSCT, D = 3.83' "1 �. // lO I , 4 I 'IS. I PBTD H 11204' CO' 12 - 3/8" LNR, 4.7 #, L - 80, D = 1.995 " —I 11241' o.!! PERFORATION SUMMARY IPBTD H 12021' A; REF LOG: Ma , ,L ON 06/16/06 4,�1' ANGLE AT TOP PERF: 88° @ 10500' 12 -3/8" LNR, 4.6#, L -80 STL, ,0039 bpf, ID = 1.995" H_. 12057' Note: Refer to Reduction DB for historical pert data S SPF I1TEZVAL ORISQZ DATE SOZ 1 -9/16" 6 10500 - 10900 0 06/16/06 1 -9/16" 6 11300 - 11850 C 06/16/06 DATE REV BY CONSENTS DATE REV BY CONWIENTS FRt.DHOE BAY UNIT P 04181 ORIGINAL COMPLETION 12/18/12 JGUJAD SET VVFDCBP(12/11 /12) WELL: G-10C 06/25/95 SIDETRACK (G -10A) PERMr No: i t060090 06130/02 JLM /KK GTO SIDETRACK (G -10B) AR No: 50- 029 - 20553 -03 06117/06 NORDIC1 CID SIDETRACK (G -10C) SEC 12, T11 N, R13E, 2554' SNL & 2368' VVEL 06/19/06 RJB/TLH DRLG DRAFT CORRECTIONS 06/23/06 BSHPJC GLV GO BP Exploration (Alaska) DATE: 28- Sep -12 Stephanie Pacillo TRANS#: 6067 Data Delivery Services Technician ai7Makana K Bender Schlumberger Oilfield Services -. \ w ' Natural Resources Technician IT WIRELINE Alaska Oil & Gas ConseriatioI? Col r- IssI 2525 Gambell St, Ste. 400 3 r ,: ,: ' ?' %'/o , Suite 1 ri(J rrt r,r,., , Al: 1-;=','" . Anchorage, AK 99503 lit: Office: (907) 273 -1770 =V 1.j `` s CM "MEEK LOG DESCRIPTION; DATE B/W COLOR . - CD's- NAME . ORDER # DIST 01ST DIST DIST LOGGED PRINTS PRINTS R -01 BCRC -00203 X MEMORY LEAK DETECTION 9- Aug -12 1 1 CD ... V -122 BINC -00101 X DRIFT SURVEY 25- May -12 1 1 CD MPB -05A C600 -00037 X MEMORY IPROF 11- Aug -12 1 1 CD G -10C C600 -00029 X PPROF / IPROF w CNL -BORAX 17- Jul -12 1 1 CD K -10C BAUJ -00138 X MEMORY PPROF w GHOST 29- Jun -12 1 1 CD S -102 COT4 -00047 X MEMORY TEMPERATURE LOG 4- Aug -12 1 1 CD 1- 35/0 -25 BG4H -00114 X XFLOW CHECK 20- Feb -12 1 1 CD 15 -05B C600 -00038 X MEMORY PPROF 16- Aug -12 1 1 CD 15 -34A BG4H -00129 X XFLOW CHECK w IBP RECORD 13- Aug -12 1 1 CD B -05C C5XI -00023 X MEMORY CEMENT BOND LOG 09 -AUG -212 1 1 CD M -23 BBSK -00133 X CROSSFLOW LOG 17- Aug -12 1 1 CD A -28 C4W7 -00011 X PPROF 4- May -12 1 1 CD C-42A C1 UB -00024 X SLIM CEMENT MAPPING TOOL 4- Aug -12 1 1 CD H -36A C5XI -00024 X MEMORY PPROF GHOST 9- Aug -12 1 1 CD 2- 58/S -09 BZ81 -00034 X LEAK DETECTION LOG 15- Aug -12 1 1 CD W -211 BZ81 -00032 X PPROF W GHOST DEFT 12- Aug -12 1 1 CD • X x Please return a signed copy to: Please return a signed copy to: BP PDC LR2 -1 _r 4 AA ; ;},)'\' '', i'l ' _"- DCS 2525 Gambell St, Suite 400 900 E Benson Blvd Anchorage AK 99503 Anchorage AK 99508 bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PAS -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 Mr. Jim Regg Alaska Oil and Gas Conservation Commission AUG e' ,1-02 338 West 7 Avenue a06 -009 � f Q q Anchorage, Alaska 99501 r1 Q (� r Subject: Corrosion Inhibitor Treatments of GPB G -Pad G —1 v Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad G that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator 0 • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) G -Pad Date: 03/05/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal G -01A 1931710 50029202140100 3.0 NA 3.0 NA 10.2 5/10/2010 G -02B 2081580 50029202170200 0.5 NA 0.5 NA 2.6 5/10/2010 G-03A 1970700 50029202210100 0.7 NA 0.7 NA 6.0 5/27/2010 G-04B 2061400 50029202250200 0.1 NA 0.1 NA 1.7 5/10/2010 G -05 1780970 50029203510000 0.0 NA 0.0 NA 0.0 5/10/2010 G -06A 2060120 50029203580100 0.6 NA 0.6 NA 5.1 5/12/2010 G -07 1790180 50029203590000 0.5 NA 0.5 NA 3.4 5/11/2010 G -08A 2061830 50029205810100 0.1 NA 0.1 NA 0.9 5/27/2010 G -09B 2071100 50029205820200 9.0 NA 9.0 NA 69.7 5/20/2010 ___.-- G -10C 2060090 50029205530300 0.9 NA 0.9 NA 8.5 3/5/2012 G -118 2080270 50029205830200 0.0 NA 0.0 NA 0.0 5/21/2010 G -12B 2031410 50029205970200 0.5 NA 0.5 NA 2.6 5/13/2010 G -13A 2001630 50029206000100 0.0 NA 0.0 NA Trace 5/12/2010 G -14B 2090680 50029206460200 0.7 NA 0.7 NA 5.1 5/22/2010 G -15B 2080650 50029206470200 26.0 4.0 0.5 7/16/2011 3.4 7/19/2011 G -16A 2090560 50029206430100 0.0 NA 0.0 NA Trace 5/22/2010 G -17A 2060760 50029206190100 21.4 4.0 0.6 7/16/2011 3.4 7/19/2011 G -18A 1990320 50029206200100 71.7 14.0 1.0 7/16/2011 8.5 7/19/2011 G -19B 2071240 50029215990200 0.0 NA 0.0 NA Trace 5/22/2010 G -21 1951540 50029226040000 0.5 NA 0.5 NA 3.4 5/12/2010 G -23B 2091440 50029216800200 0.5 NA 0.5 NA 4.3 5/11/2010 G -24A 2060820 50029216710100 0.1 NA 0.1 NA 0.9 5/11/2010 G -25B 2070860 50029216520200 5.3 NA 5.3 NA 23.8 5/28/2010 G -26B 2050480 50029216610200 2.0 NA 2.0 NA 6.8 5/11/2010 G -27A 2070310 50029216460100 0.5 NA 0.5 NA 2.6 5/30/2010 G -29B 2101410 50029216500200 2.8 NA 3.0 NA 17.0 5/13/2010 G -30C 2091510 50029216130300 1.0 NA 1.1 NA 5.1 5/30/2010 G -31B 2090310 50029216160200 0.8 NA 0.8 NA 6.0 5/21/2010 G -32A 1970010 50029216360100 0.8 NA 0.8 NA 3.4 5/21/2010 • ~~ ~~ 4 - ~~ r' ° a' ~ ' F ., n ~~~ s ~'~ {~ ,,`'~ MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm Marker.doc • WELL LOG TRANSMITTAL To: State of Alaska July 14, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: G-lOC AK-MW-4429511 G-lOC: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 50-029-20553-03 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 50-029-20553-03 Digital Log Images: 50-029-20553-03 4~r~~1~1~~:+' BUG ~ .~ ZD08 1 Color Log 1 Color Log 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 ~^ ~O~ - C~~ Signed: I- ~~~o~ i ~ ~w~ DATA SUBMITTAL COMPLIANCE REPORT 6/25/2008 Permit to Drill 2060090 Well Name/No. PRUDHOE SAY UNIT G-10C Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20553-03-00 MD 12057 TVD 9030 Completion Date 6/17/2006 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey es DATA INFORMATION Types Electric or Other Logs Run: MWD / NGP, GR / ROP, MGR /CCL /CNL (data taken from Logs Portion of Master We11 Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 34 12057 Open 7/19/2006 D C Las 15523 Gamma Ray 8894 12005 Open 10/3/2007 CCL, FCNL, GR, NCNL w/PDS and EMF graphics Neutron 5 Blu 1 8905 11989 Open 1/22/2008 MCNL, CCL, GR, CNL 15- Jun-2006 C Lis 15882 Gamma Ray 8908 11963 Open 1/22/2008 LIS Veri, GR CNT Rpt LIS Verification 9249 12047 Open 3/7/2008 LIS Veri, GR ROP ~D C Lis 16003 Gamma Ray 9249 12047 Open 3/7/2008 LIS Veri, GR ROP Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comme nts ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? v N Chips Received? .~L~ Formation Tops ~N Analysis Received? Comments: Compliance Reviewed By: Date: r< a ~ ~ WELL LOG TRANSMITTAL To: State of Alaska March 6, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data: G-lOC AK-MW-4429511 1 LDWG formatted CD rom with verification listing. API# : 5 0-029-205 5 3 -03 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 Date ~`~. `" ~, ,t?~; Signed: ~o~ -oc~ ~r~ Date 09-28-2007 Transmittal Number:92905 ~' BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) t you have any questions, please contact t~ouglas uortcn at the rli~, at war-~+y ~ ~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02-35B ~OCo -Uba ~ tSSr~ 07-07B ~U~a -~ ZS~ # 155t ~ ~- l '~- C-16B c~b(9-~5 ~ 1 v~ C-34A c~d~-~3~ ~ ~~b~~ D-07Bo?p5~<$/ ~ Y $S E-21 B a(3 5 -1~4 ~t 5~a` 1 G-06A 2D (v -Of c) ~ l5"Sc~a G-10C o~d(n-00°I ~ 15~~3 Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 • 07-Jul-06 AOGCC Ceresa Tolley 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well G-10C Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. ~~~ Tie-on Survey: 9,458.57' MD Window /Kickoff Survey: 12,035.05' MD (if applicable) Projected Survey: 12,057.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, rAK 99518 Date ~.,7 c~ ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) 1~"' ~ ~~~ - 4od STATE OF ALASKA ALASKA~IL AND GAS CONSERVATION COM SSION ~ECEIVEi JUL 1 4 2006 WELL COMPLETION OR RECOMPLETION REPORT AND LG~$ka Oil ~ Gas Cons. G • Of11n'11SSI01?7< !1 l1PL1nrn n.. 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended ^ WAG zoAAC zs.,os zoAac zs.,,o ^ GINJ ^ WINJ ^ WDSPL No. of Completions One Other 1 b. Well Class: ®Development ^ Exploratory ^ Stratigraphic ^ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 6/17/2006 12. Permit to Drill Number 206-009 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/7/2006 13. API Number 50-029-20553-03-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/13/2006 14. Well Name and Number: PBU G-10C 2554 FEL, SEC. 12, T11 N, R13E, UM FNL, 2368 Top of Productive Horizon: 3886' FNL, 3688' FEL, SEC. 12, T11 N, R13E, UM 8. KB Elevation (ft): 70.3' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 4812' FNL, 2302' FEL, SEC. 12, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD) 12021 + 9030 Ft Pool 4b. Location of Well (State Base Plane Coordinates): Surface: x- 657858 y- 5969087 Zone- ASP4 10. Total Depth (MD+TVD) 12057 + 9030 Ft 16. Property Designation: ADL 028280 TPI: x- 656567 y- 5967728 Zone- ASP4 Total Depth: x- 657972 y- 5966831 Zone- ASP4 11. Depth where SSSV set None MD 17. Land Use Permit: 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A MSL 20. Thickness of Permafrost 1900' (Approx.) 21. Logs Run: MWD / NGP, GR / ROP, MGR / CCL / CNL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING< DEPTH MO SETTING DEPTH TVD HOLE AMOUNT SIZE WT. PER FT. GRADE TOP '' -BOTTOM TOP- .BOTTOM SIZE. CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" Cement to Surface 13-3/8" 72# L-80 Surface 2686' Surface 2686' 17-1/2" 3500 sx AS II 20 sx To Job 9-5/8" 47# L-80 Surface 9620' Surface 8776' 12-1/4" 1100 sx Class 'G' 140 sx AS I 7" 29# L-80 4149' 94 4079' 8677' 8-1/2" 1011 sx Class 'G' 2-3/8" 4.6# L-80 9441' 12057' 8657' 9030' 3" 92 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24 TuewG RECORD Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET MD PACKER SET MD 1.56" Gun Diameter, 6 spf 3-1/2", 9.3#, L-80 g4gg' 4072' MD TVD MD TVD 10500' - 10900' 9035' - 9034' 11300' - 11850' 9030' - 9031' 25 ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT Ht KIND OF MATERIAL USED 2500' Freeze Protect with 20 Bbls of 60/40 McOH 26. PRODUCTION TEST Date First Production: July 3, 2006 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date of Test 7/10/2006 Hours Tested 4 PRODUCTION FOR TEST PERIOD OIL-BBL 627 GAS-MCF 1,093 WATER-BBL 6 CHOKE SIZE 96° GAS-OIL RATIO 1,744 Flow Tubing Press. 220 Casing Pressure 950 CALCULATED 24-HOUR RATE OIL-BBL 3,762 GAS-MCF 6,559 WATER-BBL 37 OIL GRAVITY-API (CORK) 26 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Su ~; if none, state "none". Mo>° None E~G<<~~ ' -f'op p ~ av ~ nJ~G d'-~ l ~ ~D/~~ 7 g ~~j~ Form 10-4 ~ e'v~ 12/2003 CONTINUED ON REVERSE SIDE ~ ~~~ J~~ ~ ~ LOOu ORIGINAL 2~. GEOLOGIC MARK 29. ORMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sadlerochit 9294' 8539' None Top CGL 9485' 868T Base CGL 9622' 8763' 23S6 J Zone 2B 9720' 8811' 22TS 9893' 8868' 21TS /Zone 2A 10023' 8917' Zone 1 B 10305' 9014' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. / 7 2 ( ~`'~~Q~P Signed Terrie Hubble Title Technical Assistant Date D PBU G-10C 206-009 Prepared ey NameMumber. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Ted Stagg, 564-4694 Permit No. / A royal No. INSTRUCTIONS GeNe~u-u: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: True vertical thickness. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: If no cores taken, indicate "None". IreM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only • • BP EXPLORATION Page 1 of 15 Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/1/2006 End: 6/17/2006 Contractor Name: NORDIC CALISTA Rig Release: 6/17/2006 Rig Name: NORDIC 1 Rig Number: N1 Date 'From - To Hours Task Code NPT Phase Description of Operations 6/4/2006 15:30 - 16:30 1.00 RIGD P PRE 16:30 - 19:30 3.00 MOB N RREP PRE 19:30 - 19:45 0.25 MOB P PRE 19:45 - 20:00 0.25 MOB P PRE 20:00 - 20:15 0.25 MOB P PRE 20:15 - 00:00 3.75 MOB P PRE 6/5/2006 01:00 - 01:15 0.25 MOB P PRE 01:15 - 01:30 0.25 MOB P PRE 01:30 - 01:45 0.25 BOPSU P PRE 01:45 - 03:30 1.75 BOPSU P PRE 03:30 - 10:00 6.50 BOPSU P PRE 10:00 - 13:00 I 3.001 RIGU I P I I PRE 13:00 - 13:15 0.25 RIGU P PRE 13:15 - 14:45 1.50 RIGU P PRE 14:45 - 15:15 0.50 STWHIP P WEXIT 15:15 - 15:30 0.25 STWHIP P WEXIT 15:30 - 18:15 2.7,5 STWHIP P WEXIT 18:15 - 18:30 1 0.251 STWHIPI P I I WEXIT 18:30-21:30 I 3.OOISTWHIPIP I IWEXIT 21:30-23:00 1.50 STWHIP P WEXIT 23:00-00:00 1.00 STWHIP P WEXIT 6/6/2006 00:00-01:00 1.00 STWHIP P WEXIT 01:00 - 02:00 1.00 STWHIP P WEXIT 02:00 - 04:00 2.00 STWHIP P WEXIT 04:00 - 05:45 1.75 STWHIP P WEXIT 05:45 - 07:45 2.00 STWHIP P WEXIT Rig released from C-04B @ 15:30Hrs on 6/4/2006. Prep to move rig off well. Jack up rig & observe control line hose to front booster leaking with ca. 1 TSP leak of hydraulic oil onto pad. Fetch new hose & replace control line. Test new control line - OK. Meanwhile C/O injector gripper blocks. PJSM for moving rig off well. Jack-up rig & pull rig off well. Conduct post-operations pad inspection. Held pre-move safety meeting with crew, security & tool services. Move rig from C-pad to G-pad. Meanwhile C/O injector gripper blocks. PJSM. Review procedure, hazards & mitigation for backing rig over well. Back rig over well & set down. ACCEPT RIG AT 01:30 HRS ON 06/05/2006. PJSM for N/U BOPE. N/U BOPE. Perform initial BOPE pressure /function test. AOGCC witness waived by Chuck Scheve. BOPE testing witnessed by BP WSLs. Meanwhile spot outside trailers & tanks. R/U hardline to CT reel. Held PJSM on stabbing CT, R/U cable and pulley, P/U injector head, Slip grapple into CT & pull test. Pull CT over pipe shed with winch & stab into injector, M/U injector to stripper, set back Inj Weld on CTC, Pull test CTC. RU dart catcher sub, pump 8bbls thru surface lines to coil with Biozan KCL water, Press test inner reel valve and hardline to 4000psi, Fill CT w/ biozan, install dart, circ, dart on seat at 39.4 bbls. RD catcher sub, RU, P/T weld-on CTC, Open well. Well was dead. PJSM on PU and handling BHA and Pre- Spud Mtg M/U BHA #1, 2.74" Pilot hole mill w/ string mill, WFD 2 3/8" PDM, 2 Jts of 2 1/16" CSH tbg, WFD MHA. OAL = 76.74' RIH with Milling Assy #1, dry tagged 9485', set do w/ 1 K, S/O Wt 18 K, PU Wt 31 K, PU to 9475', circ w/ 1.5 bpm, 1000 psi, RIH to pinch point at 9483.9', mtr stalled, S/O Wt 19.9 K, Up Wt 28 K, second tag at 9483', mtr stalled. PUH 15', circ & establish free spin @ 1.55bpm/1020psi. RBIH & ease in till motor work C~3 9482.8'. Correct CTD to 9470'. Flag pipe & start milling window with 2ppb bio-KCL fluid. Stall 4x C~ 9470.1'. Ease in & mill from 9470' to 9471' with 1.55/1.55bpm, 1020/1250psi & 2-3k WOB. Mill to 9472' with 1.55/1.55bpm, 1020/1300psi & 4k WOB. Mill to 9472.4' with 1.55/1.55bpm, 1020/1500psi & 5k WOB. Continue milling to 9473' with 1.55/1.55bpm, 1020/1500psi & 5k WOB. Mill to 9474' with 1.55/1.55bpm, 1150/1450psi & 5k WOB. Mill to 9475' with 1.55/1.55bpm, 1250/1550psi & 6k WOB. Mill to 9476' with 1.55/1.55bpm, 1300/1600psi & 5k WOB. Paint EOP flag @ 9000' & POOH window milling BHA #1. Printed: 6/20/2006 12:16:55 PM ~ I BP EXPLORATION Page 2 of 15 Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/1/2006 End: 6/17/2006 Contractor Name: NORDIC CALISTA Rig Release: 6/17/2006. Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code IVPT Phase Description of Operations -.--_.___~.__-- ---.___._-_ __-- 6/6/2006 07:45 - 08:00 0.25 STWHIP P WEXIT _ POH LD 2.74" Pilot Milling Assy # 1. DWM gauage 2.74" go / 2.73" no-go & DSM gauge 2.74" no-go. 08:00 - 09:15 1.25 STWHIP P WEXIT PU 2.74" Milling Assy #2 w/ WFD 2.74" mill, 2.5 deg mtr, Dir-Gr-Orientor, MHA, weld-on CTC 09:15 - 11:45 2.50 STWHIP P WEXIT RIH w/ Milling Assy #2, shallow hole test MWD/orientor at 3310', slight bobble thru GLM at 3920', set do on GLM at 4056', cycled orientor, TF at 45L, RIH to 4077 w/.22 bpm, tagged up, worked past 4077' w/ .22 bpm, RIH, correct depth -15' at EOP, RIH tagged dry at 9473', Up Wt 29.5K, Dn Wt 17.7K, PU, TF ~ 14 L, pump rate 1.43bpm, 1824 psi, s/o TF rolled to 2 L, mtr work at 9472.8' _, 11:45 - 12:00 0.25 STWHIP P WEXIT Milling lhru 3 1/2"'window f/ 9472.$ to '9474.3 w/ 1.51 bpm at, 2100, FS 1820psi, Pi/T 169 bbis 12:00 - 12:45 0.75 STWHIP P WEXIT Mill to 9476' with 25L TF, 1.55/1.55bpm, 2000/2150psi & 8k WOB. . 12:45 - 13:45 1.00 STWHIP P WEXIT Mill to 9477' with 15L TF, 1.55/1.55bpm, 2000/2150psi & 7k W OB. 13;45 - 14:30 0.75 STWHIP P WEXIT Control mill to 9478' with 8L TF, 1.55/1.55bpm, 2000/2150psi & 6k WOB. 14:30 - 15:15 0.75 STWHIP P WEXIT Control mill to 9480' with 8L TF, 1.55l1.55bpm, 2000/2150psi & 6k WOB. Exit into formation ~ 9480'. 15:15 - 16:45 1.50 STWHIP P WEXIT Control mill formation to 9486' with 1.55/1.55bpm, 2000/2150psi, 6k WOB & 6fph ave ROP. Meanwhile swap the welibore to 60% new/40% reconditioned 8.5ppg Flo-Pro mud with 3% L-T & 8ppb K-G. 16:45 - 17:45 1.00 DRILL P WEXIT Short wiper to 9450'. Window looks clean. RBIH & establish freespin ~ 1.55bpm/3200psi. Geo confirms formation in BU samples. 17:45 - 18:10 0.42 DRILL P WEXIT Control mill to 9490' with 2L TF, 1.55/1.55bpm, 3200/3500psi, 7k WOB & 8fph ave ROP 18:10 - 19:00 0.83 DRILL P WEXIT Backream/dress window/rat hole 3x & drift 2x. Tentative ~ window depths are: TOWS/TOW = 9470', BOW = 9480', RA , PIP Tag = 9476'. Reamed 3 times and dry tagged at 9,488 ft twice. 19:00 - 20:45 1.75 DRILL P WEXIT POOH and conducted shallow hole test on orientor at 3,500 ft (OK) 20:45 - 22:20 i.58 DRILL P PROD1 Handle BHA, Mill at 2.74" No/Go. LD window exit BHA and PU i.ideg BHI motor and HYC 2.70" x 3" BC bit. Offset at 14deg in / 69 deg out 22:20 - 00:00 1.67 DRILL P PROD1 Set counters and RIH. SHT at 3,500 ft (OK) 6/7/2006 00:00 - 01:00 1.00 DRILL P PROD1 RIH and corrected +17 ft to the window flag. Tied in from 9,270 ft to 9,340 ft (Upper Zone IV) Added 6 ft correction 01:00 - 01:20 0.33 DRILL P PROD1 Orient TF to HS above WS With ldeg LOHS, RIH and dry tagged bottom at 9,490 ft. Up wt 25k and 18k down 01:20 - 01:45 0.42 DRILL P PROD1 Orient TF to 30 to 45 R HS Op = 1.56 bpm at 3,430 psi off bottom Vp = 322 bbls 01:45 - 02:00 0.25 DRILL P PROD1 Drilling build section in ZIII at 61 R- 44R Op = 1.53 / 1.56 at 3,060 psi on btm WOB ~ 1.51k to 3.0 k to keep TF at 45R 02:00 - 02:20 0.33 DRILL P PRODi Orient TF around to 40L on bottom Printed: 6/20/2006 12:16:55 PM • BP EXPLORATION Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To ~ Hours ~ Task ~ Code NPT 6R/2006 02:20 - 02:50 0.50 DRILL ~ P 02:50 - 03:30 I 0.67) DRILL I P Start: 6/1 /2006 Rig Release: 6/17/2006 Rig Number: N1 Phase PROD1 PROD1 03:30 - 04:55 1.42 DRILL N DFAL PROD1 04:55 - 05:45 0.83 DRILL N DFAL PROD1 05:45 - 07:45 I 2.001 DRILL I N I DFAL I PROD1 07:45 - 08:00 0.25 DRILL P PROD1 08:00 - 08:15 0.25 DRILL P PROD1 08:15 - 11:00 I 2.751 DRILL I P I I PROD1 12:45 - 14:00 I 1.25 DRILL P PROD1 14:00 - 15:15 1.25 ~ DRILL P PROD1 15:15 - 17:15 I 2.001 DRILL I P I I PROD1 17:15 - 17:25 0.17 DRILL P PROD1 17:25 - 18:10 0.75 DRILL P PROD1 18:10 - 19:55 I 1.751 DRILL I P I I PROD1 19:55 - 20:00 I 0.081 DRILL I N I DFAL I PROD1 20:00 - 21:45 I 1.751 DRILL I N I DFAL I PRODi Page 3 of 15 Spud Date: 3/27/1981 End: 6/17/2006 Description of Operations Drilling build section in ZIII at 45R Op = 1.53 / 1.56 at 3,060 psi on btm WOB f~ 1.51k to 3.0 k to keep TF at 45R. Having trouble keeping the correct TF while drilling in ZIII. TF walked to 41 L. PUH to orient TF from 40L to 45R. MWD tool shut down. Working at getting it started. PUH above WS. Ttry to restart MWD without any fuck. POOH for MWD change OOH, changed out pulser and probe. Bit fine as RR, confirmed scribe. Stab injector RIH drilling BHA#4. SHT MWD & orienter ~ 5000' - OK. Orient TF to HS. RIH clean thru window with pumps down. Tag btm @ 9500'. Orient TF to 50R. Drill to 9504' with 65R TF, 1.55/1.55bpm 3000/3200psi, 7k WOB & 15fph ave ROP. Having difficulty maintaining TF. Attempt to drill past 9504' but not making any progress. Stacked 14k WOB & still not able to get motorwork or drill. Observe circ pressure fluctuations from 3000psi to 3600psi & down to 3200psi -suspect washout in BHA, weak motor, worn bit and/or plugged jets. Work pipe & attempt to drill for 2 hours without luck. POOH to inspect. OOH. PJSM. S/B injector & P/U BHA. Observe circular 1/16" grooves on MWD collar between 38' to 46' above the bit suspect orienter was not locking & was spinning the MWD on some junk downhole. Also observed a cracked MWD collar connection ca. 25' above the bit probably from hi-DLS across the window. Check motor - OK. Bit has some chipped cutters. C/O bit, MWD collars, pulser &orienter. Review situation with ANC & decide to RBIH with a new BHA to see if we can drill past the hi-DLS window area. M/U drilling BHA #5 with 1.1deg X-treme motor, MWD/GR, orienter & rebuilt Hycalog 2.7" x 3" DS100 bicenter bit #5. Scribe tools & M/U injector. RIH drilling BHA#5. SHT MWD ~ 700' & orienter ~ 3100' OK. Orient TF to HS. RIH clean thru window with pumps down. Tag btm @ 9516'. Correct CTD to 9504'. Orient TF to 80R. Drill to 9515' with 95R TF, 1.55/1.55bpm 3000/3150psi, 4k WOB & 15fph ave ROP. At 1800 hrs, lost pulses Working to kick start MWD again Drilling ahead at 90R TF to try and get past the suspected high DLS area. Pulses are weak Op = 1.64/1.68 bpm at 3347 psi on btm. Vp = 314 bbls at 18:30 hrs ROP ~ 15- 23 fph using 1.5k WOB Drilled to where CTC is in open hole Tried to restart MWD by cycling pump and working CT. Rapid inc in CTC pressure that tripped computer. 0.8 bpm at 4000 psi. Something just plugged the MW D POOH. Somethings plugged in the BHA. Op 1 bpm at 3500 psi. Printed: 6/20/2006 12:16:55 PM BP EXPLORATION Page 4 of 15 Operations: Summary Report. Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/1/2006 End: 6/17/2006 Contractor Name: NORDIC CALISTA Rig Release: 6/17/2006 Rig Name: NORDIC 1 Rig Number: N1 Date I From - To' Hours Task Code NPT I Phase Description of Operations 6/7/2006 21:45 - 00:00 2.25 DRILL N DFAL PROD1 6/8/2006 00:00 - 00:15 0.25 DRILL N DFAL PROD1 00:15 - 02:00 1.75 DRILL N DFAL PROD1 02:00 - 02:30 0.50 DRILL N DFAL PROD1 03:55 - 04:45 I 0.831 DRILL I N (DFAL (PROD1 04:45 - 07:00 I 2.251 DRILL I N I DFAL I PROD1 07:00 - 07:20 0.33) DRILL I P PROD1 07:20 - 07:45 0.42 DRILL P PROD1 07:45 - 08:15 I 0.501 DRILL I P I I PROD1 08:15 - 08:30 I 0.251 DRILL I P I PROD1 08:30 - 14:00 5.50 DRILL P 14:00 - 14:20 0.33 DRILL P PROD1 14:20 - 14:50 0.50 DRILL P PROD1 14:50 - 15:00 0.17 DRILL P PROD1 15:30 - 17:00 o.50I DRILL I P PROD1 17:30 - 18:30 I 10.00 (DRILL p I PROD1 PROD1 18:30 - 18:50 I 0.331 DRILL I P I I PROD1 18:50 - 19:15 0.42 DRILL P PROD1 19:15 - 20:30 1.25 DRILL P PROD1 20:30 - 22:20 1.83 DRILL P PROD1 22:20 - 00:00 1.67 DRILL P PROD1 OOH, stood back injector. Found the BHA is plugged in the orienter. Rupture disk in the MHA had failed also when the pressure spike occurred down hole, Found the 1-1l2" MT pin on the CTC was damaged. Install new weld-on CTC and PT. PT MHA to 3000 psi (OK). Cleaned HP CT filters and MP filters. Found Sperry's electronic package in BHA # 5 failed. Finished PU BHA RIH and SHT at 3500 ft (OK) RIH with MWD working. SD at 9050 to orient and tool would not come back. Tried to get tool to work. Unable to get tool to work after trying everything with pump. POOH to conduct CPR on MWD tool Stood back injector and trouble shoot Sperry's BHA. Changed out probe, checked wet connect and installed new pulsar, check orienter. Evidence of battery electrical power fluctuation caused the pulsar failure. RIH, SHT toot at 3500 ft. OK, RIH. Orient TF to HS. RIH clean thru window with pumps down & tag btm C~ 9552'. Correct CTD to 9540'. Orient on btm -not getting clicks. PUH 9502' & orient to 7F to 90R. MAD pass from 9502'ao 9540'.: Correct RA PIN Tag to.9474':. Correct window depth3`to TOWS/TOW =.9468', BOW = 947131'1 Drill to 9548' with 80R TF, t.55/t.55bpm 2900/3150psi, 4k WOB & 15fph ave ROP. P/U wt = 23k. S/O wt = 15k. PVT = 300bb1s, lAP = 50psi & OAP = 376psi. Short wiper & orient 2 clicks. Orient & drill to 9617' with 80-110R TF, 1.55/1.55bpm 2900/3150psi, 3k WOB & 15fph ave ROP. Wiper trip to window. RBIH. Orient TF around to 50R. Drill to 9621' with 60-80R TF, 1.55/1.55bpm 2900/3150psi, 3k WOB & 15fph ave ROP. TF flopping to the right. Orient TF around to 50R. Drill to 9641' with 60-80R TF, 1.55/1.55bpm 2900/3300psi, 4k WOB & 15fph ave ROP. Orient TF around to 20R. Drill to 9647' with 30R TF, 1.55/1.55bpm 2900/3100psi, 2k WOB & 15fph ave ROP. Vp = 300 bbis Directional Drilling in Basal of ZIII at 23R TF Op = 1.64 / 1.69 bpm at 3,252 psi. Orient TF around to 50R Directional Drilling in ZII at 46 R TF (8700 TVD) Op = 1.60 / 1.69 bpm at 3,258 psi. ROP 8-30 fph using 4k WOB. ROP in last 5 ft slowed down to 5-8 fph Sample at 9655 f tMD / 8711 ft TVD showed Zone II formation. POOH (bit trip) SD pump at 9,550 ft because of HDLS area. SHT tools at 3,700 ft while POOH (OK) OOH, Stood back injetor, service break MHA and LD and downloaded MWD tool. Installed new MHA and PU New HTC Printed: 6/20/2006 12:16;55 PM • • BP EXPLORATION Page 5 of ~ 5 Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/1/2006 End: 6/17/2006 Contractor Name: NORDIC CALISTA Rig Release: 6!17!2006 Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To Hours ~ Task i Code NPT Phase Description of Operations --.__ 6/8/2006 22:20 - 00:00 1.67 DRILL P PROD1 2.7"3.00" BC bit. 6/9/2006 00:00 - 00:30 0.50 DRILL P PROD1 Finished RU BHA, changed probe and pulsar and installed new batteries. Confirmed tool running. 00:30 - 01:00 0.50 DRILL P PROD1 RIH to 350 ft and Sperry tool flatlined. Tried to start pulsar with 01:00 - 02:50 I 1.831 DRILL I N I SFAL I PROD1 02:50 - 04:45 1.92 DRILL P PROD1 04:45 - 05:20 0.58 DRILL P PROD1 05:20 - 05:30 0.17 DRILL P PROD1 05:30 - 06:00 0.50 DRILL P PROD1 06:00 - 06:25 0.42 DRILL P PROD1 06:25 - 06:40 0.25 DRILL P PROD1 06:40 - 06:55 0.25 DRILL P PRODi 06:55 - 07:20 0.42 DRILL P PROD1 07:20 - 07:35 0.25 DRILL P PROD1 07:35 - 08:00 0.42 DRILL P PROD1 08:00 - 09:15 1.25 DRILL P PROD1 09:15 - 09:40 0.42 DRILL P PROD1 09:40 - 10:45 1.08 DRILL P PROD1 10:45 - 10:55 0.17 DRILL P PROD1 10:55 - 11:50 0.92 DRILL P PROD1 11:50 - 12:35 0.75 DRILL P PROD1 12:35 - 13:00 0.42 DRILL P PROD1 13:00 - 13:30 0.50 DRILL P PROD1 13:30 - 14:20 0.83 DRILL P PROD1 14:20 - 14:30 0.17 DRILL P PROD1 14:30 - 14:45 0.25 DRILL P PROD1 14:45 - 15:00 0.25 DRILL P PROD1 no luck POOH to trouble shoot pulsar. Trouble shoot MWD tool. Found that the new battery installed have a shortage problem. Rebuilding smart battery pack. Installed and checked pulsar. Cleaned all connections, retested tool (OK). Smart battery giving us the problems tonight. RIH SHT tool at 3,500 ft (OK) Tie-in logging down at 60 fph from 9,300 ft. to 9,341 ft (-17 ft correction) RIH with 25R TF Tagged at base of W S and fell through. R1H to 9,550 ft before bring pump on. Tagged bottom at 9,671 ft Orient TF from 140R to 45 R Drilling with 53R TF Op = 1.51 / 1.53 bpm ROP = 90 fph Drilled to 9715'. Orient 1 click & drill to 9725' with 70R TF, 1.5/1.5bpm 3100/3400psi, 1 k WOB & 65fph ave ROP. Orient 1 click & drill to 9744' with 85R TF, 1.55/1.55bpm 3150/3400psi, 2k WOB & 80fph ave ROP. Orient 1 click & drill to 9761' with 95-100R TF, 1.5/1.5bpm 3150/3400psi, 2k WOB & 45fph ave ROP. Orient 1 click & drill to 9766' with 95R TF, 1.45/1.45bpm 3050/3300psi, 2k WOB & 40fph ave ROP. Orient 1 click & drill to 9787' with 105R TF, 1.45/1.45bpm 3050/3250psi, 2k WOB & 50fph ave ROP. Orient 2 clicks & drill to 9850' with 120-140R TF, 1.45/1.45bpm 3100/3400psi, 2k WOB & 50fph ave ROP. Wiper trip clean to 9525'. RBIH to btm. P/U wt = 25k. S/O wt = 14k. PVT = 281 bbls, IAP = 50psi & OAP = 105psi. Orient & drill to 9895' with 130R TF, 1.4/1.4bpm 3000/3150psi, 2k WOB & 45fph ave ROP. Orient TF to 90L. Drill to 9939' with 65-95L TF, 1.45/1.45bpm 3000/3150psi, 2k WOB & 50fph ave ROP. Orient & drill to 9986' with 40-60L TF, 1.45/1.45bpm 3000/3250psi, 2k WOB & 75fph ave ROP. Orient 2 clicks & drill to 10000' with 95L TF, 1.55/1.55bpm 3000/3150psi, 2k WOB & 55fph ave ROP. Wiper trip clean to 9525'. RBIH to btm Orient & drill to 10028' with 60-80L TF, 1.45/1.45bpm 3000/3250psi, 2k WOB & 50fph ave ROP. TF flopping around. Geo seeing 90% chert in BU samples. Orient & drill to 10036' with 125E TF, 1.45/1.45bpm 3050/3300psi, 2k WOB & 70fph ave ROP. TF flopping around. Orient 2 clicks & drill to 10045' with 145E TF, 1.55/1.55bpm 3200/3450psi, 2k WOB & 25fph ave ROP. TF flopping around. Orient 3 clicks & drill to 10055' with 55L TF, 1.55/1.55bpm 3050/3300psi, 2k WOB & 50fph ave ROP. TF flopping around. Printed: 6/20/2006 12:16:55 PM • • BP EXPLORATION Page 6 of 15 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date I Name: ell Name: e: Name: From - To G-10 G-10 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A i Code E PT Start Rig Rig Phase Spud Date: 3/27/1981 : 6/1/2006 End: 6/17/2006 Release: 6/17/2006 Number: N1 Description of Operations 6/9/2006 14:45 - 15:00 0.25 DRILL P PROD1 Geo seeing up to 35% chert in BU samples that could be affecting the TF. 15:00 - 15:10 0.17 DRILL P PROD1 Orient 2 clicks & drill to 10061' with 90L TF, i.55/1.55bpm 3050/3400psi, 2k WOB & 90fph ave ROP. TF flopping around. 15:10 - 15:35 0.42 DRILL P PROD1 Orient 2 clicks & drill to 10082' with 55-100L TF, 1.55/1.55bpm 3200/3400psi, 2k WOB & 65fph ave ROP. TF flopping around. 15:35 - 15:50 0.25 DRILL P PROD1 Orient 4 clicks & drill to 10088' with 80L TF, 1.55/1.55bpm 3200/3400psi, 2k WOB & 35fph ave ROP. TF flopping around. 15:50 - 16:45 0.92 DRILL P PROD1 Orient around at btm. TF sill flopping. PUH & orient around to 45L. 16:45 - 17:00 0.25 DRILL P PROD1 Drill to 10094' with 50L TF, 1.55/1.55bpm 3100/3300psi, 4k WOB & 35fph ave ROP. TF getting better. 17:00 - 18:10 1.17 DRILL P PROD1 Orient & drill to 10113' with 60L TF, 1.55/1.55bpm 3200/3400psi, 2k WOB &15fph ave ROP. 18:10 - 19:30 1.33 DRILL P PROD1 Orient & drill in Zone IIA from 10,115 ft to 10123' with 60L to 70 L TF Op = 165 / 170 bpm at 3,340 psi off btm Vp = 268 bbls at 18:30 hrs. ROP is dropping due to 50-70 % of chert in samples Taking lots WOB with very little motor differential. 19:30 - 21:15 1.75 DRILL P PROD1 POOH, bit trip SD pump at 9,550 ft because of HDLS. 21:15 - 22:15 1.00 DRILL P PROD1 PJSM on BHA handling. OOH, Changed out bit and set motor to 0.8 deg bend 22:15 - 00:00 1.75 DRILL P PROD1 RIH, Tested tool at 350 ft and SHT orienter at 3500 ft (OK) 6/10/2006 00:00 - 00:30 0.50 DRILL P PROD1 Tie-in from 9,310 ft (-14.5 ft) 00:30 - 00:40 0.17 DRILL P PROD1 RIH and orient TF to HS (3R) 00:40 - 01:06 0.43 DRILL P PROD1 RIH past WS and HDLS area without any problems. RIH and tagged bottom at 10,124 ft 01:06 - 01:30 0.40 DRILL P PROD1 Orient TF around to 80 L Make ready for mud swap 01:30 - 02:15 0.75 DRILL P PROD1 Drilling in Zone IIA with 70L TF Op = 1.56 / 1.57 bpm at 3318 psi on btm ROP at 90 fph Started mud swap at 0145 hrs at 10,132 ft 02:15 - 02:30 0.25 DRILL P PROD1 Orient TF to 80 R 02:30 - 02:55 0.42 DRILL P PROD1 Drilling in Zone IIA with 90R TF Op = 1.56 / 1.57 bpm at 2760 psi off btm ROP at 90-120 fph 02:55 - 03:20 0.42 DRILL P PROD1 Orient TF around to 50 R 03:20 - 04:10 0.83 DRILL P PROD1 Orient & drilling in Zone IIA with 50 R TF Op = 1.56 / 1.57 bpm at 2,760 psi off btm ROP at 90-120 fph Finished mud swap at 03:15 hrs Possible small fault at 10,253 ft 04:10 - 05:00 0.83 DRILL P PROD1 Wiper trip to 9,550 ft 05:00 - 05:17 0.28 DRILL P PROD1 Orient & drilling in Zone IB with 50 R TF Op = 1.56 / 1.57 bpm at 2,760 psi off btm ROP at 20 - 50 fph 14 N Shale 05:17 - 05:30 0.22 DRILL P PROD1 Orient TF to 60 R in the 14N Shale 05:30 - 06:00 0.50 DRILL P PROD1 Orient & drilling in Zone IB with 50 - 70 R TF Op = 1.56 / 1.57 bpm at 2,850 psi off btm ROP at 20 - 130 fph 06:00 - 06:25 0.42 DRILL P PROD1 Orient TF around to 60deg R. Printed: 6/20/2006 12:16:55 PM :7 BP EXPLORATION Page 7 of 15 Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~ From - To Hours Task ~ Code ~ NPT _ ---_ 6/10/2006 106:25 - 07:15 ~ 0.83 ~ DRILL P 07:15 - 08:15 1.00 DRILL P 08:15 - 08:55 0.67 DRILL P 08:55 - 09:15 0.33 DRILL P 09:15 - 09:35 0.33 DRILL P 09:35 - 10:10 0.581 DRILL ~ P 10:10 - 10:40 0.50 DRILL P 10:40 - 10:55 0.25 DRILL P 10:55 - 11:40 0.75 DRILL P 11:40 - 11:55 0.25 DRILL P 11:55 - 12:40 0.75 DRILL P 12:40 - 12:55 0.25 DRILL P 12:55 - 13:10 0.25 DRILL P 13:10 - 13:30 0.33 DRILL P 13:30 - 14:00 0.50 DRILL P 14:00 - 14:15 I 0.251 DRILL I P 14:15 - 14:50 I 0.581 DRILL I P 14:50 - 15:25 0.58 DRILL P 15:25 - 15:35 0.17 DRILL P 15:35 - 16:00 I 0.421 DRILL I P 16:00 - 17:25 I 1.421 DRILL I P 17:25-17:45 ~ 0.33~DRILL P 17:45 - 18:00 0.25 DRILL P 18:00 - 18:30 0.50 DRILL P 18:30 - 19:05 I 0.581 DRILL I P 19:05 - 19:53 0.801 DRILL P 19:53 - 20:45 I 0.871 DRILL I P Spud Date: 3/27/1981 Start: 6/1 /2006 End: 6/17/2006 Rig Release: 6/17/2006 Rig Number: N1 Phase - Description of Operations PROD1 Drill to 10450' with 60-80R TF, 1.45/1.45bpm 2600/2850psi, 3k WOB & 135fph ave ROP. PROD1 Wiper trip clean to 9525'. RBIH clean to btm. PROD1 Orient & drill to 10480' with 50-70-90R TF, 1.55/1.55bpm 2800/3100psi, 4k WOB & 90fph ave ROP. PROD1 Orient TF to 90L. PROD1 Drill to 10511' with 90-80L TF, 1.55/1.55bpm 2700/3000psi, 4k WOB & 95fph ave ROP. PROD1 Orient & drill to 10575' with 75-65-40L TF, 1.55/1.55bpm 2700/3100psi, 6k WOB & 150fph ave ROP. PROD1 Orient TF around to 90L. PROD1 Drill to 10600' with 80L TF, 1.55/1.55bpm 2700/3000psi, 4k WOB & 95fph ave ROP. Landed build ~ +/-10527' (8967'sstvd). PROD1 Wiper trip clean into tbg to 9300'. PROD1 Log down GR & tie-into RA marker. Add 10' to CTD. PROD1 Orient TF to HS. RIH clean thru window with pumps down. RIH & tag btm ~ 10607'. PROD1 Orient TF around to 70-80L. PRODi Drill to 10626' with 100-115L TF, 1.55/1.55bpm 2700/3000psi, 3k WOB & 120fph ave ROP. Geo wants to target 8965 - 8967'sstvd. PROD1 Orient & drill to 10644' with 85-95L TF, 1.55/1.55bpm 2900/3150psi, 4k WOB & 125fph ave ROP. TF rolling left. PROD1 Orient & drill to 10675' with 75-95L TF, 1.55/1.55bpm 2800/3250psi, 3k WOB & 75fph ave ROP. TF rolling left. PROD1 Orient & drill to 10675' with 90-120L TF, 1.55/1.55bpm 2750/3050psi, 6k WOB & 70fph ave ROP. TF rolling left. PRODt Orient & drill to 10717' with 65-80-110L TF, 1.55/1.55bpm 2700/3000psi, 4k WOB & 50fph ave ROP. TF rolling left. PROD1 Short 100' wiper. PROD1 Drill to 10738' with 80-70L TF, 1.55/1.55bpm 2700/3050psi, 6k WOB & 95fph ave ROP. PROD1 Orient & drill to 10750' with 40-110L TF, 1.55/1.55bpm 2800/3200psi, 5k WOB & 80fph ave ROP. TF rolling left. PROD1 Wiper trip clean to 9525'. RBIH clean to btm. P/U wt = 27k. S/O wt = 15k. PVT = 282bb1s, IAP = 57psi & OAP = 290psi. PROD1 Drill to 10770' with 15L TF, 1.55/1.55bpm 2700/3000psi, 3k WOB & 90fph ave ROP. PROD1 Orient TF to 90R. PROD1 Orient & drilling in Zone IB with 100 R TF Op = 1.75 / 1.75 bpm at 3,150 psi off btm ROP at +100 fph Vp = 276 bbls PROD1 TF rolling, orient TF to 130-140 R TF to deduce hole angle. Hole angle at 92 deg, need to drop down and maintain a 8,965 ft ND PROD1 Orient & drilling in Zone IB with 150-160 R TF Op = 1.75 / 1.75 bpm at 3,150 psi off btm ROP at +100 fph Seeing some evidence of fluid seepage to the formastion from 10,830 ft and deeper. PROD1 Orient TF around, projected hole angle at 10853 = 90 deg PUH and pulled tight to 40k 10,853 ft 10,475 ft Printed: 6/20/2006 12:16:55 PM • BP EXPLORATION Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Event Name: REENTER+COMPLETE Start: 6/1/2006 Contractor Name: NORDIC CALISTA Rig Release: 6/17/2006 Rig Name: NORDIC 1 Rig Number: N1 Date From - To !, Hours Task Code i NPT Phase 6/10/2006 20:45 - 21:20 0.58 DRILL (P ~ ~ PROD1 21:20 - 23:15 I 1.921 DRILL I P I I PROD1 23:15 - 23:45 0.50 DRILL P PROD1 23:45 - 00:00 0.25 DRILL P PROD1 6/11/2006 ~ 00:00 - 01:40 1.67 ~ DRILL P PROD1 01:40 - 02:00 ~ 0.33 ~ DRILL ~ P ~ ~ PROD1 02:00 - 02:10 0.17 DRILL P PROD1 02:10 - 02:30 0.33 DRILL P PROD1 02:30 - 04:30 2.00 DRILL P PROD1 04:30 - 04:45 0.25 DRILL P PROD1 04:45 - 04:55 0.17 DRILL P PROD1 04:55 - 06:00 1.08 DRILL P PROD1 06:00 - 06:30 ~ 0.50 ~ DRILL P ~ PROD1 06:30 - 07:20 I 0.831 DRILL I P I I PROD1 07:20 - 07:30 0.17 DRILL P PROD1 07:30 - 07:45 0.25 DRILL P PROD1 07:45 - 07:55 0.17 DRILL P PRODi 07:55 - 08:30 0.58 DRILL P PROD1 Page 8 of 15 Spud Date: 3/27/1981 End: 6/17/2006 Description of Operations Orient & drilling in Zone IB with 88-95 R TF. Op = 1.66 / 1.3 bpm at 3,100 psi off btm. Losing 0.4 bpm at present ROP at +100 fph when hole correct TF. Vp = 256 bbl (electrical) Wiper trip to 9550 ft Vp 254 bbl at start of wiper trip Trip out was clean, RIH. Small amout motor work at 10,300 ft (shale) Lost 8 bbl fluid on wiper trip Orient TF to 80-90 R Orient & drilling in Zone IB with 90 R TF. Op = 1.66 / 1.3 bpm at 3,100 psi off btm. Losing 0.3 bpm at present ROP at +100 fph when hole correct TF. Vp = 243 bbl Drilling became ratty at 10,936 ft Possible fault tip out close to 11,075 ft. Needed to make 100 wiper trip to get back to drilling. Orient & drilling in Zone IB with 90-100 R TF. Op = 1.60 / 1.58 bpm at 3,100 psi off btm. Losing 0.4 bpm at present ROP at +120 fph Conducting Mud swap at 10,930 ft With new mud in open hole, ROP picked up to 150 fpm and smooth out. Orient & drilling in Zone IB with 90-100 R TF. Op = 1.60 / 1.7 bpm at 3,100 psi off btm. Fluid losses stopped with new mud in hole At 10976 ft the hole angle inc with low TF Orient TF down Orient & drilling in Zone IB with 160 R TF. Op = 1.60 / 1.7 bpm at 3,100 psi off btm. Formation sample at 11,050 ft has TOP. Wiper Trip, clean trip out Orient & drilling in Zone IB with 160 R TF. Op = 1.60 / 1.7 bpm at 3,100 psi off btm. ROP ~ +100 fph Formation sample at 11,050 ft has TOP & LOC whick could be the fault tip out as described in the programme. Orient TF around to 90 R Orient & drilling in Zone IB with 70-150 R TF. Op = 1.67 / 1.75 bpm at 2850 psi off btm. ROP ~ 50 -100 fph Orient TF around to 90R. P/U wt = 26k. S/O wt = 14k. PVT = 321 bbls, IAP = 61 psi & OAP = 341 psi. Drill to 11156' with 110-50R TF, 1.55/1.55bpm 2550/2850psi, 2k WOB & 50fph ave ROP. TF flopped to 55R. Orient to 90R. Drill to 11157' with 90-20R TF, 1.55/1.55bpm 2550/2850psi, 12k WOB & 5fph ave ROP. TF flopped to 20R. Orient 2 clicks. Drill to 11161' with 75R TF, 1.6/t.6bpm 2700/3000psi, 15k WOB & 5fph ave ROP. Stacking wt & not getting much motor work. Geo seeing up to 5-10% chert & some pyrite in BU Printed: 6/20/2006 12:16:55 PM BP EXPLORATION Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~ From - To Hours ~ Task Cade ~ NPT I 6/11/2006 07:55 - 08:30 0.58 DRILL P 08:30 - 10:45 2.25 DRILL P 10:45 - 11:30 I 0.751 DRILL I P 11:30 - 12:45 1.25 DRILL P 12:45 - 13:00 0.25 DRILL P 13:00 - 14:50 1.83 DRILL P 14:50 - 15:30 0.67 DRILL P 15:30 - 16:20 0.83 DRILL P 16:20 - 16:30 0.17 DRILL P 16:30 - 16:45 0.25 DRILL P 16:45 - 17:00 I 0.251 DRILL I P 17:00 - 17:30 0.50 DRILL P 17:30 - 17:45 0.25 DRILL P 17:45 - 17:55 0.17 DRILL P 17:55 - 18:20 0.42 DRILL P 18:20 - 19:00 1 0.671 DRILL 1 P 19:00 - 21:15 21:15 - 22:30 2.251 DRILL I N 1.251 DRILL I N Start: 6/1 /2006 Rig Release: 6/17/2006 Rig Number: N1 Phase PROD1 PROD1 PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 DFAL IPRODI DFAL IPRODI 22:30 - 00:00 1.50 DRILL N DFAL PROD1 6/12/2006 00:00 - 00:20 0.33 DRILL N DFAL PROD1 00:20 - 00:56 0.60 DRILL N DFAL PROD1 00:56 - 02:00 1.07 DRILL N DFAL PROD1 02:00 - 02:20 0.33 DRILL N DFAL PROD1 02:20 - 03:30 1.17 DRILL P PROD1 03:30 - 03:45 I 0.251 DRILL I N I DPRB I PROD1 Page 9 Cf 15 Spud Date: 3/27/1981 End: 6/17/2006 Description of Operations samples. Decide to POOH to changeout bit. POOH drilling BHA #9. Function test orienter above window & got 2 for 2 clicks. OOH. PJSM. S/B injector. UD BHA#9. Check bit -grade 5/2/1 with a plugged nozzle. Check motor - OK. Check orienter btm s-eeve was loose. C/O orienter, MW D probe & batteries. Observe 5' of flat CT above CTC -will cut & rehead. M/U drilling BHA #10 with 0.8degs X-treme motor, MWD/GR, orienter & rerun Hughes 2.7" x 3" bicenter bit #10. Cut CT & install new weld-on CTC. Pull test to 35k & P/test to 3500psi - OK. M/U injector RIH drilling BHA #10. SHT tool @ 3500' - OK. RIH to 9300'. Log down GR & tie-into RA marker. Subtract 13' from CTD. Orient TF to HS. RIH clean thru window with pumps down. RIH & set down ~ 11095'. P/U & run thru shale. Tag bim ~ 11168'. Orient to 90R. P/U wt = 25k. S/O wt = 14k. PVT = 301 bbls, IAP = 59psi & OAP = 188psi. Drill to 11175' with 85-55R TF, 1.55/1.55bpm 2700/2850psi, 1k WOB & 45fph ave ROP. TF rolling left. Drill to 11179' with 45-20R TF, 1.55/1.55bpm 2700/2850psi, 4k WOB & 40fph ave ROP. TF rolling left. Orient TF to 45R -flopping to the left. Re-orient again. Drill to 11182' with 35R TF, 1.5/1.5bpm 2600/2800psi, 15k WOB & 5fph ave ROP. Stacking wt in shale with TF rolling hard left. Orient TF to 90R. Drill shale with TF rolling from 90R to 100L. Set TF at 30 R to look for reactive torque Set TF at 30 R to look for reactive torque. Set wt on bit. Taking lots of WOB to get through this section at 11,186 ft Drilling with -3k to -7k WOB. TF rolled 7R around to 120 R, orienter is locking Beating and drilling with 30R TF? Op = 1.74 / 1.75 bpm at 2,950 psi off bottom. Vp = 290 bbls at 18:36 hrs POOH for orienter SD pump at 9550 ft and pulled through WS area, OOH. PJSM on BHA Handling. Changed out MHA, orienter and motor (+0.8 dge) External offset at 92.2 deg RIH, tested tool at 350 ft and 3500 ft RIH with BHA #11 Tie-in from 9,310 ft down at 60 fph. (Corrected -12 ft) RIH and orient TF to 10R. RIH past WS, RIH Tagged at 11,185 ft. Orient TF to 10-20 R Drilling lateral at 10-20R TF Op = 1.67 / 1.65 bpm at 3080 psi off bottom. Still seeing fluid seepage to formation Vp = 273 bbl. Drilling shales requiring lots of WOB (-8k stacking) Working to get shale through typical Z1 shale PUH to orient TF after hole angle leveled out to 70R While working back to bottom, the clay/shale started to pack Printed: 6/20/2006 12:16:55 PM BP EXPLORATION Page 10 of 15 Operations Summary Report Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/1/2006 End: 6/17/2006 Contractor Name: NORDIC CALISTA Rig Release: 6/17/2006 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~ Hours ~ Task Code ~ NPT Phase ~ Description of Operations 6/12/2006 103:30 - 03:45 ~ 0.25 ~ DRILL N ~ DPRB ~ PROD1 off around the bit. Pulled 50 k to get out of area. Called MI to 03:45 - 04:15 + 0.50 DRILL N DPRB PROD1 04:15 - 06:00 1.75 DRILL N DPRB PROD1 06:00 - 13:55 7.92 DRILL P PROD1 13:55 - 14:00 0.08 DRILL P PRODi 14:00 - 14:10 0.17 DRILL P PROD1 14:10 - 14:15 0.08 DRILL P PROD1 14:15 - 14:25 0.17 DRILL P PROD1 14:25 - 14:40 0.25 DRILL P PRODi 14:40 - 14:50 0.17 DRILL P PROD1 14:50 - 15:00 0.17 DRILL P PROD1 15:00 - 15:20 0.33 DRILL P PROD1 15:20 - 16:15 0.92 DRILL P PROD1 16:15 - 18:10 1.92 DRILL P PROD1 18:10 - 18:24 0.23 DRILL P PROD1 18:24 - 19:00 0.60 DRILL P PROD1 19:00 - 19:11 I 0.181 DRILL I P I I PROD1 19:11 - 19:30 I 0.321 DRILL I P I I PROD1 19:30 - 20:00 I 0.501 DRILL I P I I PROD1 20:00 - 20:45 I 0.751 DRILL I P I I PROD1 increase the KlaGard to 12ppb instead of 8ppb. PTD at 11,203 MD / 8965 ft TVD. Orient TF to HS to try and get oui of this stuff Drilling with 22R TF. Formation sample is 100% shale and claystone. Presently try to drill at 8967 ft TYD and need to climb to approximately 8963 ft TVD. Op=1.61/1.59 bpm Vp = 262 bbl. CT drill wt at -Sk with very little motor work, ROP at 0-10 fph Grind out of shale ~ 11256' with 20L-25R TF, 1.6/1.6bpm 2850/2900psi, 20k WOB, -6k CT wt & 5fph ave ROP. Orient TF to 90R. Drill to 11260' with 60R TF, 1.4/1.4bpm 2800/3200psi, 4k WOB & 30fph ave ROP. Orient TF to 100R. Drill to 11271' with 100R TF, 1.4/1.4bpm 2800/3200psi, 5k WOB & 65fph ave ROP. Orient 1 click & drill to 11280' with 115R TF, 1.4/1.4bpm 2750/3150psi, 5k WOB & 45fph ave ROP. Drill to 11285' with 70-90R TF, 1.4/1.4bpm 2750/3150psi, 5k WOB & 45fph ave ROP. Orient 2 clicks & drill to 11288' with 105-110R TF, 1.4/1.4bpm 2900/3150psi, 9k WOB & 25fph ave ROP. Stacking wt. Orient to LS & drill to 11295' with 160-175R TF, 1.4/1.4bpm 2800/2950psi, 10k WOB & 20fph ave ROP. Stacking wt. Orient 1 click & drill to 11331' with 160-175R TF, 1.4/1.4bpm 2850/3300psi, 5k WOB & 45fph ave ROP. Wiper trip clean to 9550'. RBIH to btm. Saw small wt bump at 11178 ft but TF was 180 deg out Orient TF to 90R getting 40 deg reactive torque Drilling lateral to maintain 8,960 ft to 8,963 ft TVD Op 1.65 / 1.6 bpm still losing fluid Lost 43 bbl of fluid in last 12 hrs CTP = 3,100 psi off btm presure Vp = 220 bbls ROP at +100 fph Mini wiper trip of 300 ft to 11,170 ft Set down at 11178 ft, 11,204 ft and 11230 ft. Red Op to 0.7 bpm and went through Drilling lateral to maintain 8,960 ft to 8,963 ft TVD Op 1.65 / 1.6 bpm CTP = 3,100 psi off btm presure Vp = 216 bbls Back in the sand/shale sequence ~ 8,959 ft TVD. ROP dropped to 10-50 fph Mini wiper trip at 11382 ft to 11,115 ft. RIH Set down 11,167 ft BHA handing up, Reduced OP and RIH set down at 11,203 ft. Trying to get back to drilling. Shales are giving us a lot of trouble. Taked 50k sometimes to PUH. Drilling lateral to maintain 8,960 ft to 8,963 ft TVD. Presently at 8,958 ft TVD. Printed: 6/20/2006 12:16:55 PM • BP EXPLORATION Page 11 of 15 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ' Name: ell Name: e: Name: From - To ~ G-10 G-10 REENTE NORDIC NORDIC Hours j R+COM CALIS 1 Task PLET TA Code ~ E NPT Start Rig Rig l Phase l Spud Date: 3/27/1981 : 6/1/2006 End: 6/17/2006 Release: 6/17/2006 Number: N1 Description of Operations __ _ _ _ __ 6/12/2006 20:00 - 20:45 0.75 DRILL P PROD1 Back in the sand/shale sequence @ 8,959 ft TVD. Op 1.65 / 1.6 bpm CTP = 3,100 psi off btm presure Vp = 213 bbls Found sweet spot at 11,425 ft drilling at 130 fph. Added 100 bbl of used 8.6ppg Flo_pro with 12 ppb KlaGard to pits 20:45 - 21:19 0.57 DRILL P PROD1 Orient TF around to level out at 8959 ft 21:19 - 21:40 0.35 DRILL P PROD1 Drilling lateral to maintain 8,960 ft to 8,963 ft TVD.. TF at 90R Op 1.65 / 1.6 bpm CTP = 3,100 psi off btm presure Vp = 304 bbls 21:40 - 00:00 2.33 DRILL P PROD1 Wiper trip after drilling 119 ft New target is 8,959 ft to 8,960 TVD from the Geo Harry Clean trip out. 6/13/2006 00:00 - 00:10 0.17 DRILL P PROD1 Finish wiper trip, Reduced Op at 11150 ft and had no problem going through the shal between 11,070 ft and 11,250 ft. 00:10 - 00:20 0.17 DRILL P PROD1 Orient TF from 160 R to 80R Lost 12 bbl on wiper trip 00:20 - 00:53 0.55 DRILL P PROD1 Drilling lateral at target 8,960 to 8,960 ft TVD TF at 80R HS Op=1.5/1.58 bpm CTP = 3050 / 3550 psi ROP = +100 fph, then fell off to nothing at 11,460 ft Some differential sticking taking place at 11,464 ft, took50- 60k to pull free Having trouble getting it to drill, having problems sliding 00:53 - 01:10 0.28 DRILL P PROD1 Wiper trip to cleanup around BHA 01:10 - 01:30 0.33 DRILL P PROD1 Working to get back to drilling, unable to slide. Called for mud swap, mud is grey in color due to large amounts of shale drilled. At 11,488 ROP increased to 100 fph using 1.8 bpm and CTP = 4000 psi on bottom. Had probelms stalling and tripping out on high pump pressure. 01:30 - 03:11 1.68 DRILL P PROD1 Unable to drill. PUH to tie-in and wait on vac trucks 03:11 - 03:42 0.52 DRILL P PROD1 Tie-in at 9,290 ft logging down. Corrected +18 ft 03:42 - 05:05 1.38 DRILL P PROD1 RIH and orient TF before going through WS. RIH Pump off betweel 9,450 ft and 9,550 ft Tagged bottom at 11,507 ft 05:05 - 05:15 0.17 DRILL P PROD1 Orient TF to 80 L 05:15 - 06:15 1.00 DRILL P PRODi Orient & Drilling lateral in Zone 1 w/ 50 to 80L TF Op = 1.65 /1.67 bpm. CTP = 2900 / 3250 psi ROP at 150 fph. Steady drilling with new mud in the hole. New mud was an huge improvement 06:15 - 06:50 0.58 DRILL P PROD1 Orient & drill to 11650' with 75L TF, 1.6/1.6bpm 2500/2800psi, 1k WOB & 135fph ave ROP. TF rolling left. 06:50 - 09:00 2.17 DRILL P PROD1 Wiper trip clean to window. RBIH clean to btm. 09:00 - 09:20 0.33 DRILL P PRODi Drill to 11673' with 55L TF, 1.6/1.6bpm 2500/2800psi, 1k WOB & 155fph ave ROP. 09:20 - 10:00 0.67 DRILL P PROD1 Orient TF around to 55L. 10:00 - 11:30 1.50 DRILL P PROD1 Drill to 11800' with 80-90L TF, 1.6/1.6bpm 2500/3000psi, 5k WOB & 125fph ave ROP. Printed: 6/20/2006 12:16:55 PM BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/1 /2006 Rig Release: 6/17/2006 Rig Number: N1 Date From - To Hours Task Code ; NPT Phase i 6/13/2006 11:30 - 14:00 2.50 DRILL P PROD1 14:00 - 14:30 0.50 DRILL P PROD1 14:30 - 14:40 0.17 DRILL P PROD1 14:40 - 15:05 0.42 DRILL P PROD1 15:05 - 15:30 0.42 DRILL P PROD1 15:30 - 16:15 0.75 DRILL P PROD1 16:15 - 18:50 2.58 DRILL P PROD1 18:50 - 22:00 3.17 DRILL P PROD1 22:00 - 23:45 1.75 DRILL P PROD1 23:45 - 00:00 0.25 DRILL P PROD1 6/14/2006 00:00 - 00:15 0.25 DRILL P PROD1 00:15 - 01:15 1.00 DRILL P PROD1 01:15 - 04:00 2.75 DRILL P PROD1 04:00 - 05:00 1.00 DRILL P PROD1 05:00 - 05:30 0.50 BOPSU P PROD1 05:30 - 06:30 1.00 CASE P RUNPRD 06:30 - 07:15 0.75 CASE P RUNPRD 07:15 - 10:35 I 3.331 CASE I P I I RUNPRD 10:35 - 13:35 I 3.001 CASE P RUNPRD 13:35 - 14:05 0.501 CASE I P RUNPRD 14:05 - 15:30 I 1.421 CASE I P I I RUNPRD 15:30 - 19:00 I 3.501 CASE I N I WAIT I RUNPRD 19:00 - 19:15 ~ 0.25 ~ CASE ~ P ~ ~ RUNPRD 19:15 - 22:15 I 3.001 CEMT P RUNPRD Page 12 of 15 Spud Date: 3/27/1981 End: 6/17/2006 Description of Operations Wiper trip to window. RBIH clean to btm. Drill to 11860' with 80-90L TF, 1.5/1.5bpm 3050/3450psi, 5 - 7k WOB & 175fph ave ROP. Orient TF around to 130R Drill to 11886' with 117E TF, 1.5/1.5bpm 3050/3450psi, 5 - 7k WOB & 185fph ave ROP. Orient TF around to 90R Drill to 11950' with 78 - 88R TF, 1.65/1.65bpm 3175/3600psi, 5 - 7k WOB & 200fph ave ROP. Wiper trip to window. RBIH clean to btm. Dirtectionally drill 1.58 / 1.58 bpm at 3000 psi, FS = 2900 psi, Surface wt -8K. Stacking out in shales. Drilled to 12050. Geo called TD. Wiper to window. Log tie - in. complete tie - in log correct +15'. Complete wiper and tag TD.12057'. Lay in liner running pill and POH. LD BHA Function test BOP. Prep floor for running Iiner,Pump volume dart. Install dart catcher. Load wiper dart. Launch & chase with mud. Dart hit @ 39.3bbls RD dart catcher sub, retr dart, std back inj. PJSM on handling and running 2 3/8" tubing, M/U 2-3/8" STL indexing guide shoe, float collar, 1 shoe jt, float collar, spacer pup jt & latch collar. M/U 62jts of 2-3/8" 4.6# L-80 STL w/ turbos, 2-3/8" pup, 18jts of 2-3/8" 4.6# L-80 STL w/ turbos, 2 3/8" pup, M/U Baker Deployment sleeve and CTLRT. OAL 2615.55'. MU CTC, stab injector RIH with liner to window, circ @ min rate. Wt check: Up = 30k. Run-in wt = 18k. Continue RIH ~ 50fpm thru window into OH. Set down, worked thru tight hole f/ 11190' to 12045', P/U Wt 43k S/O Wt 3 K, tag TD several times ~ same depth. Correct CTD to 12057'. Load 5/8" steel ball &circ with mud @ 1.4/1.4bpm & 3150psi. Set down 10k down on LBRT. Continue circ to seat. Slow down to .6 bpm, 1900psi w/ 28 bbls away. Ball on seat C~? 30.7bbls. Pressure up to 4300psi & release CTLRT. P/U ~ 25k & confirm release. Clean rig pits, displace well to 2% KCL water at 1.4/1.3 bpm 2435 - 1663 psi, built 30 bbl, 2ppb Biozan pill to displace cement, 8% fluid loss with KCL water on formation. Will add to cement volume to account for fluid loss. Continue to circ 8.5 ppg KCL fluid at 1.38/1.22 w/ 1362 psi while waiting on SLB lab test results. Note: Nordic job was behind Doyon 16 job being loaded out. Cement sample was sent to SLB lab at approx 13:10 hours, RU SLB cmtr's, first lab test failed due to equipment malfunction, performing second attempt of cement lab results SAFETY MEETING. Review procedure, hazards and mitigation for pumping cement. 15min Circ. KCL water 1.47 bpm, .94 bpm returns. Batch Mix 21 bbls of 15.8 ppg latex cement, Printed: 6/20/2006 12:16:55 PM BP EXPLORATION Page 13 of 15 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: ell Name: e: Name: From - To G-10 G-10 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task _.I PLET A Code ---- E NPT Start Rig Rig Phase Spud Date: 3/27/1981 : 6/1/2006 End: 6/17/2006 Release: 6/17/2006 Number: N1 Description of Operations 6/14/2006 19:15 - 22:15 3.00 CEMT P RUNPRD Pump 3 bbls of FW, pressure test lines to 4k.OK. Pump 19.0 bbls cmt slurry @ 1.77/1.04 bpm,3260 psi. Close inner reel valve & clean lines. Load/launch with 430 psi CTWP Displace with 34 bbls 8.5 ppg 2 ppb biozan/ 4.6 bbls of 8.6 ppg brine C~ .45/.29 bpm, 3360 psi. Trying to packoff. CTW P engage LW P at 38.6bbls away. Shear plug with 4500psi. Continue displacing LW P C~3 .28/ .18 bpm, 3800 psi, decrease rate to .29/.25 bpm as pressure increases to 4500 psi. Shut down ~ 43.6 bbl in total and 8.6 bbl out total. RU DS and test lines to 8000 psi. Theoritical in total to bump plug 48.46 bbls. Continue to displace liner wiper plug pressure to 6000 psi @ .3 bpm. Pressure broke back to 4400 psi. Continue to displace at 1 bpm ~ 4650 psi. Bump plug with 1000 psi at 4.2 bbl or 47.8 bbl total displacement. 8.8 bbl lost to formation. Floats head Pressure up to 400 psi & sting out of liner. CIP at 22:15 ftrs Top of Liner at 9441 LC at 12020' FS at 12057 22:15 - 00:00 1.75 CEMT P RUNPRD POH 6/15/2006 00:00 - 00:15 0.25 CEMT P RUNPRD LD liner running BHA. 00:15 - 00:30 0.25 CONDH P RUNPRD PJSM for pu cleanout assembly. Had cement in liner running tools. 00:30 - 04:00 3.50 CONDH P RUNPRD PU mill motor and 86 joints 1" CSH tubing. 04:00 - 08:30 4.50 CONDH P RUNPRD RIH with cleanout assy to 7000', circ at minimum rate, cmt in returns, WOC UCA test result for 500 psi compressive strength 08:30 - 10:05 1.58 CONDH P RUNPRD Washing down f/ 7000' to 12020' w .70 bpm 2150 psi, Dn Wt 16 K, returns showed cement contaminated water w/ 9.2 ppg, Cmt compressive strength at 1300 psi 10:05 - 13:25 .3.33 CONDH P RUNPRD POH to BHA, pumping .70 bpm 1150 psi, 45 fpm 13:25 - 15:35 2.17 CONDH P RUNPRD PJSM w/ crew on std bk 1"CSH, Breakout MHA, drop 1"steel ball, open circ sub, POH, Std Back 1" CSH, LD Motor and mill 15:35 - 16:05 0.50 EVAL P LOW ER1 MU swivel stick, RIH, jet stack, recover cmt contaminated returns, POH, LD same 16:05 - 17:30 1.42 EVAL P LOW ERi PJSM on handling and running MCNL tools, MU MCNL-GR-CCL, RIH w/ 1"CSH, MHA, stab injector 17:30 - 18:45 1.25 EVAL P LOWERI RIH w/ MCNL BHA to 8900'. 18:45 - 20:45 2.00 EVAL P LOW ER1 Log down ~ 30fpm from 8950'. Start pumping down 150kcps Flo-Pro perf pill. Continue logging down to 12020' PBTD 20:45 - 21:45 1.00 EVAL P LOW ER1 Log up ~ 60fpm from 12020' to 8900' while laying-in 150kcps perf pill in liner. 21:45 - 22:45 1.00 EVAL P LOWERI POOH logging BHA#14. 22:45 - 00:00 1.25 EVAL P LOWERI R/B 43 stands of 1"CSH. 6/16/2006 00:00 - 01:00 1.00 EVAL LOW ER1 Standback CSH. 01:00 - 01:15 0.25 EVAL LOW ER1 PJSM for LD source. 01:15 - 01:45 0.50 EVAL LOW ER1 LD source and logging tools. 01:45 - 02:30 0.75 EVAL LOW ERi Test liner lap to 2142 psi. Lost 44 psi in 36 minutes, Good Test. 02:30 - 02:45 0.25 EVAL N DFAL LOWERI Cannot read data from memory tool. Tool not running when recovered. SLB to prep a second tool 02:45 - 03:00 0.25 EVAL N DFAL LOW ER1 PJSM to PU source. 03:00 - 04:45 1.75 EVAL N DFAL LOWERI PU memory tool and 43 stands of 1"CSH tubing. 04:45 - 06:05 1.33 EVAL N DFAL LOWERI RIH to 8900' 06:05 - 08:05 2.00 EVAL N DFAL LOW ER1 Log down ~ 30fpm from 8950'. Start pumping down 150kcps Panted: 6/20/2006 12:16:55 PM BP EXPLORATION Page 14 of 15 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: ell Name: e: Name: From - To ~ G-10 G-10 REENTE NORDIC NORDIC Hours I R+COM CALIST 1 Task PLET A Code ~ E NPT Start Rig Rig Phase i Spud Date: 3/27/1981 : 6/1/2006 End: 6/17/2006 Release: 6/17/2006 Number: N1 Description of Operations 6/16/2006 06:05 - 08:05 2.00 EVAL N DFAL LOW ER1 Flo-Pro pert pill. Continue logging down to 12007' corrected to 12020 'PBTD. 08:05 - 09:00 0.92 EVAL N DFAL LOW ER1 Log up ~ 60fpm from 12020' to 8900' while laying-in 150kcps pert pill in liner. 09:00 - 10:00 1.00 EVAL N DFAL LOW ER1 POOH w/ logging BHA 15. 10:00 - 12:15 2.25 EVAL N DFAL LOWERI R/B 43 stands of 1"CSH. 12:15 - 12:30 0.25 EVAL N DFAL LOWERI PJSM for LD source. LD source and togging tools. Revised liner top 9417, PBTD 12002. based on memory log 12:30 - 13:00 0.50 PERFO P LOWERI RU handling tools, PJSM on handling and running pert guns, Fax CNL log to ANG Geo. ANC Geo OKs preliminary pert picks. 13:00 - 14:00 1.00 PERFO P LOW ER1 M/U 27 jts of 1.56" HSD 6spf 1606PJ guns & blanks with BCF firing system. Conduct safety jUvalve drill while M/U perf guns 14:00 - 15:30 1.50 PERFO P LOWERI M/U 34 stds of 1" CSH, MU MHA, stab injector 15:30 - 17:30 2.00 PERFO P LOWERI RIH w/ Perf Gun Assy, RIH tagged btm corrected PBTD to MCNL to 12003', PU and position guns w/ btm shot at 11850', top shot at 11300' 17:30 - 18:30 1.00 PERFO P LOWERI Pumped 5 bbls of perf pill, Dropped 1/2" AL ball, pump 5 bbls of perf pill behind followed w/ 39.2 bbls of 2% KCI, ball on seat, pressured up to 3350 psi, sheared ball, fired pert guns on the fly with btm shot at 11850' and top shot at 11300'. No Losses. 18:30 - 19:00 0.50 PERFO P LOWERI POH to 9400' 19:00 - 19:30 0.50 PERFO P LOWERI Flow Check Well above liner lap at 9400', No Flow 19:30 - 20:30 1.00 PERFO P LOWERi POH to Perf Gun Assy. 20:30 - 21:15 0.75 PERFO P LOW ERi Flow check well. No Flow. 21:15 - 22:30 1.25 PERFO P LOWERI RU handling tools, POH, Std Bk 1"CSH 22:30 - 00:00 1.50 PERFO P LOW ER1 POH, LD Perf Guns, all shots fired. Load out perf guns. 6/17/2006 00:00 - 00:45 0.75 PERFO P LOW ER1 Continue LD guns from run #1. 00:45 - 01:45 1.00 PERFO P LOW ER1 PU gun for run #2. 01:45 - 03:00 1.25 PERFO P LOWERI PU 34 stands of 1"CSH. 03:00 - 04:45 1.75 PERFO P LOWERI RIH to flag at 8300 EOP. Correct -7'. 04:45 - 05:55 1.17 PERFO P LOWERI Pumped 10 bbls of perf pill, Dropped 1/2" AL ball, pump. launch with 880 psi displace with 5 bbls of perf pill behind followed w/ 40.2 bbls of 2% KCI, ball on seat, pressured up to 3370 psi, sheared ball, fired perf guns on the fly with btm shot at 10900' and top shot at 10500'. Good surface indication that guns fired w/ surface shot detector. No Losses. 05:55 - 06:10 0.25 PERFO P LOW ER1 POH to 9400' 06:10 - 06:40 0.50 PERFO P LOWERI Flow Check Well above liner lap at 9367', No Flow 06:40 - 07:40 1.00 PERFO P LOWERI PQH to Perf Gun Assy. 07:40 - 08:10 0.50 PERFO P LOW ER1 Flow check well. No Flow. 08:10 - 10:10 2.00 PERFO P LOWERi Break Inj and CTC, Set Bk Inj, POH, LD 68 jts - 1"CSH, offload f/ pipeshed 10:10 - 11:45 1.58 PERFO P LOW ER1 PJSM on handling fired perfs guns, RU, POH, LD Perf Guns, all shots fired. Load out perf guns. 11:45 - 12:15 0.50 PERFO P LOW ER1 RIH w/ 7 stds of 1 CSH 12:15 - 12:55 0.67 PERFO P LOWERI POH, LD 14 jts - 1"CSH, offload f/ pipeshed 12:55 - 14:15 1,33 WHSUR P POST MU nozzle RIH to 2500'. Pump 20 bbls of McOH followed by 8.5 ppg KCL at 1.77 bpm w/ 1115 psi, POOH freeze protecting with 60/40 McOH. FP from 300' with 100% McOH. SI master valve (18 turns) & swab valve (18 turns). 14:15 - 14:55 0.67 WHSUR P POST PJSM on bleach pill and mixing CI, Pump 10bbls of bleach, 40bbls of fresh water, 15bbls of corrosion inhibitor & 5 bbls of Printed: 6/20/2006 12:16:55 PM Printed: 6/20/2006 12:16:55 PM Halliburton Company Survey Report -- Compauy: BP Amoco _ _ - _- Date 6/28/2006 Time: 09:55:58 Pagc: 1 Field: Prudhoe Bay Co -ordinate(IVE) Reference: Well: G-10, True North Site: PB G Pad Ve rtical (TVD) Re ference: G-10A 70.3 Well: G-10 Section (VS) Refer ence: Well (O.OON,O.OOE,178.29Azi) Wellpath: G-10C Survey Calculatio n Ylethod: Minimum Curva ture Ub: Oracle ~ Field: Prudhoe Bay -- -- - -__ North Slope UNITED STATES Map System:US State Plane Coordin ate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Cla rke 1866) Coordinate Sy stem: Well Centre Sys Datum: Mean Sea L evel Geomagnetic Model: bggm2005 Well: G-10 Slot Name: G-10 Well Position: +N/-S 2222.37 ft Northing: 5969088.00 ft Latitude: 70 19 20.067 N +E/-W 1604.34 ft Easti ng : 657859.00 ft Longitude: 148 43 12.191 W Position Uncertainty: 0.00 ft Wellpath: G-10C Drilled From: G-10A 500292055303 Tie-on Depth: 9458.57 ft Current Datum: G-10A Height 70.34 ft Above System Datum: Mean Sea Level Magnetic Data: 1/8/2006 Declination: 24.65 deg Field Strength: 57605 nT Mag Dip Angle: 80.90 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.85 0.00 0.00 178.29 Survey Program for Definitive Wellpath Date: 1/8/2006 Validated: Yes Version: 3 Actual From To Survey Toolcode Tool Name ft ft 109.78 8204.25 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 8254.51 9458.57 2 : MWD - Standard (8254.51-11 MWD MWD -Standard 9468.00 12057.00 MWD (9468.00-12057.00) MWD MWD -Standard Survey ', MD [ncl Azim 'TVD Sys TVD N/S E/N' MapN MapE Tool ft deg deg ft ft ft ft ft ft 34.85 0.00 0.00 34.85 -35.49 0.00 0.00 5969088.00 657859.00 TIE LINE 109.78 0.15 308.30 109.78 39.44 0.06 -0.08 5969088.06 657858.92 BOSS-GYRO 209.78 0.18 281.90 209.78 139.44 0.17 -0.33 5969088.17 657858.66 BOSS-GYRO 309.78 0.07 175.81 309.78 239.44 0.15 -0.48 5969088.14 657858.51 BOSS-GYRO 409.78 0.17 287.80 409.78 339.44 0.13 -0.62 5969088.12 657858.38 BOSS-GYRO 509.78 0.33 175.00 509.78 439.44 -0.11 -0.74 5969087.87 657858.27 BOSS-GYRO 609.78 0.47 176.90 609.78 539.44 -0.81 -0.69 5969087.18 657858.33 BOSS-GYRO 709.78 0.35 176.31 709.77 639.43 -1.52 -0.65 5969086.46 657858.39 BOSS-GYRO 809.78 0.25 224.10 809.77 739.43 -1.98 -0.78 5969086.00 657858.26 BOSS-GYRO 909.78 0.13 210.79 909.77 839.43 -2.24 -0.99 5969085.74 657858.06 BOSS-GYRO 1009.78 0.25 33.90 1009.77 939.43 -2.15 -0.92 5969085.83 657858.12 BOSS-GYRO 1109.78 0.30 36.20 1109.77 1039.43 -1.76 -0.65 5969086.23 657858.39 BOSS-GYRO 1209.78 0.52 44.29 1209.77 1139.43 -1.23 -0.18 5969086.77 657858:85 BOSS-GYRO 1309.78 0.83 44.20 1309.76 1239.42 -0.38 0.64 5969087.63 657859.65 BOSS-GYRO 1409.78 0.87 52.40 1409.75 1339.41 0.60 1.75 5969088.64 657860.74 BOSS-GYRO 1509.78 0.47 32.70 1509.74 1439.40 1.41 2.57 5969089.46 657861.54 BOSS-GYRO 1609.78 0.38 35.50 1609.74 1539.40 2.02 2.99 5969090.09 657861.94 BOSS-GYRO 1709.78 0.40 79.50 1709.74 1639.40 2.36 3.52 5969090.43 657862.47 BOSS-GYRO 1809.78 0.23 27.70 1809.74 1739.40 2.60 3.96 5969090.68 657862.90 BOSS-GYRO 1909.78 0.37 65.59 1909.74 1839.40 2.91 4.35 5969091.00 657863.29 BOSS-GYRO 2009.78 1.47 58.70 2009.72 1939.38 3.71 5.74 5969091.83 657864.66 BOSS-GYRO 2109.78 1.22 54.40 2109.69 2039.35 5.00 7.70 5969093.16 657866.59 BOSS-GYRO 2209.78 1.07 71.19 2209.67 2139.33 5.92 9.45 5969094.11 657868.32 BOSS-GYRO 2309.78 0.50 68.50 2309.66 2239.32 6.38 10.74 5969094.60 657869.60 BOSS-GYRO 2409.78 0.67 70.19 2409.66 2339.32 6.74 11.69 5969094.98 657870.55 BOSS-GYRO 2509.78 0.97 107.41 2509.65 2439.31 6.68 13.05 5969094.95 657871.91 BOSS-GYRO 2609.78 1.43 133.81 2609.63 2539.29 5.56 14.76 5969093.87 657873.64 BOSS-GYRO 2709.78 0.37 61.59 2709.62 2639.28 4.85 15.95 5969093.19 657874.84 BOSS-GYRO Halliburton Com any P Survey Report __ __ _ - _ - - - __ - -- --- 1 ~~ Cnmpan~~: BP Amoco Date: 6/28/2006 Time: 09:55:58 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-10, True North Site: PB G Pad Vertical (TVll) Reference G-10A 70.3 I Well: G-10 Section (VS) Reference: Well (O.OON,O.OOE,178.29Azi) Wellpath: G-10C Survey Calculation Method: Minimum Curvature Db: Oracle Survcv ~iD Intl Azim TVI) S~~s'I'VIJ NIS E/W D~IapY ~IapE Tool ft deg deg ft ft ft ft ft ft i 2809.78 0.82 270.90 2809.61 2739.27 5.02 15.51 5969093.34 657874.40 BOSS-GYRO 2909.78 2.67 261.60 2909.56 2839.22 4.69 12.49 5969092.95 657871.39 BOSS-GYRO 3009.78 5.58 252.69 3009.29 2938.95 2.90 5.55 5969091.02 657864.48 BOSS-GYRO 3109.78 8.03 243.60 3108.58 3038.24 -1.65 -5.35 5969086.24 657853.68 BOSS-GYRO 3209.78 10.60 240.50 3207.26 3136.92 -9.29 -19.62 5969078.30 657839.58 BOSS-GYRO 3309.78 11.80 240.79 3305.35 3235.01 -18.81 -36.55 5969068.43 657822.86 BOSS-GYRO 3409.78 13.33 241.39 3402.95 3332.61 -29.32 -55.59 5969057.52 657804.04 BOSS-GYRO 3509.78 16.13 236.39 3499.66 3429.32 -42.53 -77.29 5969043.86 657782.63 BOSS-GYRO 3609.78 17.98 236.79 3595.26 3524.92 -58.67 -101.77 5969027.20 657758.49 BOSS-GYRO 3709.78 21.30 235.10 3689.43 3619.09 -77.52 -129.59 5969007.77 657731.08 BOSS-GYRO 3809.78 24.27 234.10 3781.62 3711.28 -99.97 -161.14 5968984.67 657700.01 BOSS-GYRO 3909.78 26.63 234.69 3871.91 3801.57 -124.98 -196.08 5968958.93 657665.60 BOSS-GYRO 4009.78 28.75 236.60 3960.45 3890.11 -151.18 -234.45 5968931.94 657627.80 BOSS-GYRO 4109.78 31.92 237.89 4046:75 3976.41 -178.47 -276.93 5968903.75 657585.90 BOSS-GYRO 4209.78 32.50 238.19 4131.36 4061.02 -206.69 -322.16 5968874.60 657541.28 BOSS-GYRO 4309.78 32.15 238.69 4215.86 4145.52 -234.67 -367.72 5968845.66 657496.32 BOSS-GYRO 4409.78 32.23 238.19 4300.49 4230.15 -262.56 -413.11 5968816.83 657451.53 BOSS-GYRO 4509.78 32.08 238.50 4385.15 4314.81 -290.49 -458.42 5968787.96 657406.83 BOSS-GYRO 4609.78 31.75 238.10 4470.03 4399.69 -318.27 -503.39 5968759.24 657362.45 BOSS-GYRO 4709.78 31.92 237.89 4554.99 4484.65 -346.22 -548.12 5968730.35 657318.32 BOSS-GYRO 4809.78 31.88 237.60 4639.89 4569.55 -374.42 -592.81 5968701.22 657274.24 BOSS-GYRO 4909.78 31.45 237.89 4725.00 4654.66 -402.44 -637.21 5968672.27 657230.44 BOSS-GYRO 5009.78 32.02 237.89 4810.05 4739.71 -430.40 -681.76 5968643.39 657186.49 BOSS-GYRO 5109.78 32.13 238.89 4894.79 4824.45 -458.23 -726.98 5968614.61 657141.87 BOSS-GYRO 5209.78 31.92 238.50 4979.57 4909.23 -485.78 -772.29 5968586.11 657097.15 BOSS-GYRO 5309.78 32.28 239.29 5064.28 4993.94 -513.24 -817.79 5968557.72 657052.24 BOSS-GYRO 5409.78 32.25 238.79 5148.84 5078.50 -540.70 -863.57 5968529.30 657007.06 BOSS-GYRO 5509.78 32.43 239.29 5233.33 5162.99 -568.22 -909.44 5968500.82 656961.78 BOSS-GYRO 5609.78 32.73 239.19 5317.59 5247.25 -595.76 -955.71 5968472.32 656916.10 BOSS-GYRO 5709.78 33.50 239.19 5401.35 5331.01 -623.74 -1002.63 5968443.36 656869.78 BOSS-GYRO 5809.78 33.78 239.60 5484.60 5414.26 -651.94 -1050.32 5968414.16 656822.70 BOSS-GYRO 5909.78 34.03 240.00 5567.60 5497.26 -680.00 -1098.53 5968385.09 656775.10 BOSS-GYRO 6009.78 34.38 240.00 5650.30 5579.96 -708.11 -1147.21 5968355.97 656727.02 BOSS-GYRO 6109.78 34.67 239.50 5732.69 5662.35 -736.66 -1196.17 5968326.40 656678.68 BOSS-GYRO 6209.78 35.07 239.19 5814.74 5744.40 -765.81 -1245.35 5968296.22 656630.12 BOSS-GYRO 6309.78 35.50 239.19 5896.36 5826.02 -795.40 -1294.96 5968265.60 656581.15 BOSS-GYRO 6409.78 35.75 238.69 5977.65 5907.31 -825.45 -1344.86 5968234.51 656531.90 BOSS-GYRO 6509.78 35.48 238.79 6058.94 5988.60 -855.67 -1394.64 5968203.25 656482.77 BOSS-GYRO 6609.78 35.20 238.60 6140.52 6070.18 -885.72 -1444.06 5968172.16 656433.99 BOSS-GYRO 6709.78 34.93 238.60 6222.37 6152.03 -915.66 -1493.10 5968141.21 656385.60 BOSS-GYRO 6809.78 34.42 238.19 6304.61 6234.27 -945.47 -1541.55 5968110.39 656337.79 BOSS-GYRO 6909.78 34.28 238.29 6387.17 6316.83 -975.17 -1589.53 5968079.69 656290.45 BOSS-GYRO 7009.78 33.63 238.79 6470.11 6399.77 -1004.32 -1637.17 5968049.54 656243.44 BOSS-GYRO 7109.78 33.43 238.89 6553.47 6483.13 -1032.90 -1684.44 5968019.97 656196.78 BOSS-GYRO 7209.78 33.27 238.69 6637.01 6566.67 -1061.39 -1731.45 5967990.51 656150.38 BOSS-GYRO 7309.78 32.82 238.79 6720.83 6650.49 -1089.69 -1778.07 5967961.24 656104.37 BOSS-GYRO 7409.78 32.52 239.19 6805.01 6734.67 -1117.50 -1824.33 5967932.46 656058.71 BOSS-GYRO 7509.78 31.72 238.29 6889.70 6819.36 -1145.08 -1869.78 5967903.93 656013.85 BOSS-GYRO 7609.78 31.22 238.89 6974.99 6904.65 -1172.29 -1914.34 5967875.79 655969.88 BOSS-GYRO 7709.78 31.03 238.29 7060.60 6990.26 -1199.23 -1958.45 5967847.93 655926.34 BOSS-GYRO 8009.78 27.97 237.89 7321.67 7251.33 -1277.28 -2083.85 5967767.26 655802.62 BOSS-GYRO 8109.78 26.88 237.29 7410.44 7340.10 -1301.97 -2122.74 5967741.77 655764.27 BOSS-GYRO Halliburton Com any P Survey Report Company : BP Amoco Date: 6/28/2006 1'imc: 09:55:58 Page: 3 ~! Field. Pru dhoe Bay Co-o rdinate (NN;) Reference: Well: G-1Q, True North ~, Site: PB G P ad Verti cal (TV D) Reference: G-10A 70.3 ', ~Vdl: G1 0 Secti on (b'S ) Referencr. Well (O.OON,O.OO E,17829Azi) ', Wellpath: G-10C Survey Calculati on Method: Minimum C urvat we Dh: Oracle Survev i`1D Incl ,~zim T~'D Sys'I'V U N/S N;/W I~LipN ~'lapE; fool ft deg deg ft ft ft ft ft ft 8204 .25 26. 05 237. 50 7495. 00 7424. 66 -1324. 65 -2158 .20 5967718. 34 655729 .29 BOSS-GYRO 8254 .51 25. 83 241. 50 7540. 20 7469. 86 -1335. 81 -2177 .14 5967706. 79 655710 .60 MWD 8393 .50 16. 92 237. 54 7669. 51 7599. 17 -1361. 17 -2220 .90 5967680. 52 655667 .38 MWD 8487 .52 12. 15 237. 59 7760. 49 7690. 15 -1373. 82 -2240 .81 5967667. 45 655647 .74 MWD 8580 .73 6. 37 232. 99 7852. 45 7782. 11 -1382. 20 -2253 .23 5967658. 82 655635 .50 MWD 8675 .69 0. 74 118. 97 7947. 22 7876. 88 -1385. 67 -2256 .91 5967655. 27 655631 .90 MWD 8768 .75 1. 14 69. 68 8040. 27 7969. 93 -1385. 64 -2255 .51 5967655. 33 655633 .29 MWD 8861 .54 3. 08 69. 18 8132. 99 8062. 65 -1384. 43 -2252 .32 5967656. 60 655636 .46 MWD 8955 .14 10. 20 68. 98 8225. 90 8155. 56 -1380. 56 -2242 .22 5967660. 68 655646 .48 MWD 9048 .97 17. 27 69. 16 8316. 99 8246. 65 -1372. 62 -2221 .42 5967669. 06 655667 .10 MWD 9142 .66 23. 44 65. 05 8404. 80 8334. 46 -1359. 79 -2191 .50 5967682. 51 655696 .75 MWD 9173 .69 24. 92 63. 68 8433. 10 8362. 76 -1354. 29 -2180 .04 5967688. 25 655708 .08 MWD 9213 .60 26. 84 61. 52 8469. 01 8398. 67 -1346. 27 -2164 .58 5967696. 60 655723 .37 MWD 9244 .29 28. 16 61. 74 8496. 23 8425. 89 -1339. 53 -2152 .11 5967703. 59 655735 .69 MWD 9275 .19 30. 47 60. 27 8523. 17 8452. 83 -1332. 20 -2138 .89 5967711. 21 655748 .76 MWD 9305 .73 33. 19 59. 35 8549. 12 8478. 78 -1324. 09 -2124 .97 5967719. 60 655762 .50 MWD 9336 .49 35. 34 57. 18 8574. 54 8504. 20 -1314. 98 -2110 .25 5967729. 02 655777 .03 MWD 9365 .82 35. 85 58. 31 8598. 39 8528. 05 -1305. 87 -2095 .81 5967738. 44 &55791 .27 MWD. 9396 .88 37. 08 57. 14 8623. 37 8553. 03 -1296. 01 -2080 .20 5967748. 62 655806 .66 MWD 9428 .65 39. 58 57. 03 8648. 29 8577. 95 -1285. 30 -2063 .67 5967759. 67 655822 .97 MWD 9458 .57 43. 55 58. 56 8670. 67 8600. 33 -1274. 73 -2046 .87 5967770. 59 655839 .54 MWD 9468 .00 44. 81 58. 78 8677. 43 8607. 09 -1271. 32 -2041 .25 5967774. 12 655845 .08 MWD 9489 .77 57. 22 58. 00 8691. 10 8620. 76 -1262. 46 -2026 .88 5967783. 28 655859 .27 MWD 9529 .80 57. 66 63. 33 8712. 66 8642. 32 -1245. 94 -1997 .48 5967800. 41 655888 .31 MWD 9564 .75 56. 16 68. 03 8731. 74 8661. 40 -1233. 88 -1970 .81 5967813. 03 655914 .72 MWD 9599 .43 55. 46 72. 73 8751. 24 8680. 90 -1224. 25 -1943 .81 5967823. 23 655941 .51 MWD 9625 .52 56. 01 76. 27 8765. 93 8695. 59 -1218. 49 -1923 .03 5967829. 42 655962 .16 MWD 9649 .50 57. 74 83. 41 8779. 05 8708. 71 -1214. 96 -1903 .28 5967833. 37 655981 .83 MWD 9689 .99 62. 84 88. 34 8799. 12 8728. 78 -1212. 47 -1868 .23 5967836. 59 656016 .82 MWD 9722 .40 68. 71 91. 27 8812. 41 8742. 07 -1212. 39 -1838 .69 5967837. 30 656046 .34 MWD 9754 .66 71. 98 97. 30 8823. 27 8752. 93 -1214. 67 -1808 .42 5967835. 65 656076 .66 MWD 9784 .99 73. 24 106. 20 8832. 35 8762. 01 -1220. 57 -1780 .12 5967830. 35 656105 .07 MWD 9820 .99 71. 81 113. 30 8843. 17 8772. 83 -1232. 15 -1747 .82 5967819. 45 656137 .60 MWD 9853 .29 69. 42 119. 27 8853. 90 8783. 56 -1245. 63 -1720 .52 5967806. 55 656165 .19 MWD 9884 .71 67. 06 124. 72 8865. 56 8795. 22 -1261. 07 -1695 .78 5967791. 63 656190 .24 MWD 9923 .39 65. 92 122. 61 8880. 99 8810. 65 -1280. 73 -1666 .26 5967772. 60 656220 .17 MWD 9969 .18 69. 14 112. 56 8898. 53 8828. 19 -1300. 25 -1628 .80 5967753. 87 656258 .02 MWD 9999 .83 69. 52 108. 90 8909. 35 8839. 01 -1310. 40 -1601 .99 5967744. 29 656285 .04 MWD 10029 .71 67. 94 103. 98 8920. 19 8849. 85 -1318. 28 -1575 .29 5967736. 97 656311 .89 MWD 10068 .71 66. 62 101. 87 8935. 26 8864. 92 -1326. 33 -1540 .24 5967729. 66 656347 .11 MWD 10099 .05 67. 32 95. 37 8947. 14 8876. 80 -1330. 51 -1512 .65 5967726. 06 656374 .78 MWD 10135 .93 67. 94 90. 27 8961. 18 8890. 84 -1332. 18 -1478 .60 5967725. 11 656408 .85 MWD 10168 .61 69. 70 85. 88 8972. 99 8902. 65 -1331. 15 -1448 .16 5967726. 78 656439 .27 MWD 10200 .52 71. 10 84. 64 8983. 70 8913. 36 -1328. 67 -1418 .20 5967729. 89 656469 .16 MWD 10236 .81 70. 58 91. 32 8995. 62 8925. 28 -1327. 46 -1383 .96 5967731. 82 656503 .36 MWD 10267 .48 73. 48 92. 73 9005. 08 8934. 74 -1328. 49 -1354 .81 5967731. 40 656532 .53 MWD 10293 .96 76. 20 96. 07 9012. 01 8941. 67 -1330. 46 -1329 .34 5967729. 97 656558 .04 MWD 10327 .29 78. 57 99. 23 9019. 29 8948. 95 -1334. 79 -1297 .11 5967726. 32 656590 .35 MWD 10363 .37 80. 68 103. 28 9025. 79 8955. 45 -1341. 72 -1262 .31 5967720. 12 656625 .28 MWD 10396 .81 82. 72 106. 78 9030. 62 8960. 28 -1350. 30 -1230 .36 5967712. 22 656657 .40 MWD 10433 .85 85. 87 112. 07 9034. 30 8963. 96 -1362. 56 -1195 .62 5967700. 70 656692 .39 MWD 10469 .09 89. 30 117. 87 9035. 79 8965. 45 -1377. 41 -1163 .72 5967686. 51 656724 .59 MWD 10501 .73 88. 15 117. 16 9036. 51 8966. 17 -1392. 49 -1134 .78 5967672. 05 656753 .84 MWD Halliburton Company Survey Report Company: BP Amoco Field: Prudhoe Bay Site: PB G Pad Nell: G-10 ~Vcllpath: G-10C Sun c~ ', ~iD Ind ft deg zim deg VD ft ysT~'D ft /S ft Date: 6/28/2006 Cn-nrdinate(i\'E) Reference: Vertical (TVD) Reference: Section (VS) Reference: Survey Calculation Method: F/VV blapA ft ft Timt• 09:55:58 Pat,~e: Well: G-10, True North G-10A 70.3 Well (O.OON,O.OOE,17829Azi) Minimum Curvature llb: Map M: Tool ft 4~ racle j 10541 .43 88. 15 111. 54 9037 .80 8967. 46 -1408. 84 -1098 .65 5967656 .46 656790 .31 MWD 10570 .94 91. 05 108. 55 9038 .00 8967. 66 -1418. 95 -1070 .93 5967646 .94 656818 .23 MWD 10600 .27 91. 23 107. 50 9037 .42 8967. 08 -1428. 03 -1043 .05 5967638 .45 656846. 29 MWD 10635 .88 89. 91 105. 39 9037 .06 8966. 72 -1438. 11 -1008 .90 5967629 .09 656880. 64 MWD 10671 .46 89. 91 100. 64 9037 .12 8966. 78 -1446. 12 -974 .24 5967621 .81 656915 .46 MWD 10706 .40 89. 56 98. 18 9037 .28 8966. 94 -1451. 83 -939 .78 5967616 .83 656950 .04 MWD 10739 .45 88. 51 91. 68 9037 .84 8967. 50 -1454. 67 -906 .87 5967614 .68 656982 .99 MWD 10773 .26 91. 41 92. 73 9037 .86 8967. 52 -1455. 97 -873 .09 5967614 .09 657016 .79 MWD 10813 .01 93. 08 97. 13 9036 .30 8965. 96 -1459. 38 -833 .53 5967611 .52 657056 .41 MWD 10855 .34 90. 26 102. 57 9035 .07 8964. 73 -1466. 62 -791 .86 5967605 .16 657098. 22 MWD 10889 .43 89. 47 106. 79 9035 .15 8964. 81 -1475. 25 -758 .89 5967597 .22 657131. 36 MWD 10931 .72 90. 53 112. 42 9035 .15 8964. 81 -1489. 44 -719 .07 5967583 .87 657171. 47 MWD 10961 .63 91. 05 113. 12 9034 .74 8964. 40 -1501. 01 -691 .49 5967572 .88 657199 .28 MWD 10998 .62 93. 43 119. 10 9033 .29 8962. 95 -1517. 27 -658 .32 5967557 .33 657232 .79 MWD 11031 .13 92. 37 124. 90 9031 .64 8961. 30 -1534. 47 -630 .80 5967540 .71 657260 .66 MWD 11069 .83 87. 98 128. 59 9031 .53 8961. 19 -1557. 61 -599 .80 5967518 .23 657292 .14 MWD 11099 .69 88. 68 132. 46 9032 .40 8962 .06 -1577. 00 -577 .12 5967499 .32 657315 .22 MWD 11137 .40 86. 84 137. 38 9033 .87 8963. 53 -1603. 60 -550 .44 5967473 .29 657342. 44 MWD 11170 .42 86. 66 139. 31 9035 .74 8965. 40 -1628. 23 -528 .53 5967449 .13 657364. 87 MWD 11200 .42 88. 77 137. 91 9036 .94 8966. 60 -1650. 72 -508 .72 5967427 .07 657385 .15 MWD 11230 .01 92. 28 137. 20 9036 .67 8966. 33 -1672. 55 -488 .75 5967405 .66 657405 .57 MWD 11267 .61 96. 50 136. 68 9033 .79 8963. 45 -1699. 93 -463 .16 5967378 .82 657431. 73 MWD 11296 .76 94. 22 137. 56 9031 .07 8960. 73 -1721. 20 -443 .41 5967357 .98 657451 .92 MWD 11334 .64 91. 23 143. 88 9029 .27 8958. 93 -1750. 47 -419 .47 5967329 .22 657476 .47 MWD 11376 .46 91. 49 154. 25 9028 .27 8957. 93 -1786. 28 -398 .01 5967293 .87 657498 .68 MWD 11425 .45 88. 77 154. 78 9028 .16 8957. 82 -1830. 50 -376 .93 5967250 .11 657520. 68 MWD 11465 .56 88. 51 156. 72 9029 .11 8958. 77 -1867. 06 -360 .47 5967213 .91 657537. 91 MWD 11497 .95 89. 12 153. 55 9029 .78 8959. 44 -1896. 44 -346 .85 5967184 .82 657552. 14 MWD 11536 .74 89. 03 145. 64 9030 .41 8960. 07 -1929. 86 -327 .24 5967151 .82 657572 .45 MWD 11575 .79 87. 89 143. 36 9031 .46 8961. 12 -1961. 64 -304 .57 5967120 .53 657595 .78 MWD 11605 .16 88. 68 136. 32 9032 .34 8962. 00 -1984. 06 -285 .65 5967098 .51 657615 .16 MWD 11639 .13 89. 03 140. 54 9033 .02 8962. 68 -2009. 46 -263 .12 5967073 .59 657638 .22 MWD 11669 .31 90. 79 133. 86 9033 .07 8962. 73 -2031. 59 -242 .63 5967051 .90 657659. 17 MWD 11707 .85 91. 44 130. 70 9032 .32 8961. 98 -2057. 51 -214 .12 5967026 .59 657688. 22 MWD 11744 .48 90. 53 126. 31 9031 .69 8961. 35 -2080. 31 -185 .47 5967004 .40 657717. 34 MWD 11774 .36 89. 65 122. 97 9031 .64 8961. 30 -2097. 29 -160 .89 5966987 :94 657742. 27 MWD 11809 .65 89. 56 118. 92 9031 .88 8961. 54 -2115. 43 -130 .63 5966970 .44 657772. 90 MWD 11843 .20 90. 00 114. 35 9032 .01 8961. 67 -2130. 47 -100 .65 5966956 .04 657803. 19 MWD 11884 .11 89. 03 116. 11 9032 .36 8962. 02 -2147. 91 -63 .64 5966939 .38 657840 .55 MWD 11938 .57 91. 67 125. 78 9032 .02 8961. 68 -2175. 87 -16 .99 5966912 .41 657887 .77 MWD 11974 .73 91. 14 131. 05 9031 .14 8960. 80 -2198. 33 11 .32 5966890 .55 657916 .55 MWD 12009 .35 90. 61 136. 15 9030 .61 8960. 27 -2222. 19 36 .38 5966867 .22 657942. 11 MWD 12035 .05 89. 47 140. 54 9030 .59 8960. 25 -2241. 39 53 .46 5966848 .39 657959. 58 MWD 12057 .00 89. 47 140. 54 9030 .79 8960. 45 -2258. 33 67 .41 5966831 .74 657973. 88 MWD TRFF - 3-1/A" FMC W/4° WELLHEAD McEVOY ACTUATOR = ~~ AXELSON KB. ELEV _ 70.3' BF. ELEV = 32.27 KOP = ~ 3205' Max Angle = _. 97 @ 11268' Datum fv1D = 9899` Datum TV D = 8800' SS ~, ~.' 13-318" CSG, 72#, N-80, ID = 12.347" ~--~ 26$6' ITOPOF 7" SCAB LNR 4149' Minimum IQ = 1.920" @ 9448' TOP OF 2-318" LNR 7" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" $064' TOP OF 7" LNR - 3-112" WFD LSX WHIPSTOCK (05120/06) 9470' RA TAG 9476' 3-1i2" WFD CIBP (04/07106) 94$5' TOP OF 2-318" LNR 9498' 9-5/8" CSG, 47#, L-80, ID = 8.681" 8250' 3-1/2" TBG, 9.2#, L-80 NSCT, ID = 2.992" 9788' 7" LNR, 29#, L-80, ID = 6.184" 10235' 4-1/2" LNR, 12.6#, L-80 11170' NSCT, ID = 3.83" PBTD -j 11204' 2-3/8" LNR, 4.7#, L-80, ID = 1.995" 11241' PERFORATION SUMMARY REF LOG: SPERRY SUN tv1t1'~D ! S1~JS dv1CNLIGR ON XX1XXtXX`? RNGLE AT TOP PERF; 88 @ 10500' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OPNlSOZ DATE 1-9116" 6 10500 - 10900 O 06/16/06 1-9116" 6 11300 - 11850 O 06/18/06 4072' ~9-5/8" X 3-1/2" BKR SABL-3 PKR WlKBH-22 ANCHOR SEAL ASSY, ID = 3.93" 4157' 9-5/8" X 7" BAKER LNR PKR, (D = 6.187" $07~-j 9-518" X 7" BAKER LNR PKR, ID = 6.187" 9441' 2-3/8" BKR DEPLOY SLV, ID = 2.250" 9 1 ` TOP OF CEMENT (06!14/06) MILLOUT WINDOW (G10C) 9470' - 9480' PBTD -i 12021' ~- 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.920" 12057' DATE REV BY COMMENTS DATE REV BY COMMENTS 04181 ORIGINAL COMPLETION 06/25/95 SIDETRACK{G-10A} 06/30/02 JLM/KK CTD SIDETRACK (G-106} 06/17/06 NORDIC1 CTD SIDETRACK (G-10C) ~?~ifl~iit?ti R.1B,Tt.H DRLGi?RAFTCORRFCTlONS 06123!06 BSEJPJC GLV C/O PF2UDHOE BAY UNIT WELL G-10C PERMIT No: "2060090 API No: 50-029-20553-03 SEC 12, T11 N, R13E, 2554' SNL & 2368' WEL BP Exploration {Alaska} S Y NOTES: SEE PREVIOUS WELLBORE SATIC FOR MORE DETAILS ON PARENT WELL ~1 ®~ A REVIOUS SIDETRACKS {G-10A & G-10B) 70° @ 10169' 2201' 3-1/2" HES XBD SSSV LAND NIP, ID = 2.75" 2604' 9-5/8" DV PKR GAS LIFT MANDRELS ® ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 3918 3878 28 FMHO DMY RK 0 01/30/06 1 4039 3984 30 FMHO SO RK 20 06/23/06 7 ~ ~ FRANK H. MURKOWSKI, GOVERNOR ~7~A OiL t>•isL Vrva 333 W. T" AVENUE, SUITE 100 C01~5ERQATI011T CO1rII~'II5SIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 27&7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaskaj, Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay, G- l OC BP Exploration (Alaska), Inc. Permit No: 206-009 Surface Location: 2554' FNL, 2368' FEL, SEC. 12, T11N, R13E, UM Bottomhole Location: 4839' FNL, 2250' FEL, SEC. 12, T11N, R13E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount Jr. Commissioner DATED this ~~day of January, 2006 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA AND GAS CONSERVATION CO ISSION JAN 2 ~ 200fi P E R M ~T T~ ~ R ~ L ~- Alaska Oil & Gas Cans. Commission 20 AAC 25.005 Anchorage ia. Type of work ^ Drill ®Redrill ^ Re-Entry 1b. Current Well Class ^ Exploratory ®Development Oil ^ Multiple Zone ^ Stratigraphic Test ^ Service ^Development Gas ^ Single Zone 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU G-10C '" 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12125 TVD 8966ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 2554' FNL 2368' FEL UM SEC 12 T11 N R13E 7. Property Designation: ADL 028280 Pool , , . , , , Top of Productive Horizon: 3613' FNL, 4334' FEL, SEC. 12, T11N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: February 12, 2006 ~ Total Depth: 4839' FNL, 2250' FEL, SEC. 12, Ti 1 N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 13600' 4b. Location of Well (State Base Plane Coordinates): Surface: x- 657858 - 5969087 Zone- ASP4 10. KB Elevation (Height above GL): 70.34' feet 15. Distance to Nearest Well Within Pool 1000' 16. Deviated Wells: Kickoff Depth: 9470 feet Maximum Hole Angle: 92 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3200 Surface: 2320 ''~ 1s. asmg rogram: Size .Specifications Setting Depth T Bottom uantrty o ement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.6# L-80 ST-L 2700' 9425' 8575' 121 8966' 3 sx Class 'G' 19. PRESENT :WELL CONDITION. SUMM ARY. (To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): 11241 Total Depth TVD (ft): 9021 Plugs (measured): None Effective Depth MD (ft): 11204 Effective Depth TVD (ft): 9022 Junk (measured): None Casin Length Size Cement Volume MD TVD r n 110' 20" x 30" ement to Surface 110' 110' 2686' 13-3/8" 500 sx AS II, 20 sx To Job 2686' 2686' 9620' 9-5/8" 1100 sx Class 'G', 140 sx AS I 9620' 8776' Pr i 5471' 7" 1011 sx Class 'G' 4149' - 9620' 4079' - 8776' Liner 1743' 2-3/8" 72 sx Class 'G' 9498' - 11241' 8698' - 9021' Perforation Depth MD (ft): 9924' - 11100' Perforation Depth TVD (ft): 8989' - 9023' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ^ Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ted Stagg, 564-4694 Printed Name Ted Stagg Title CT Drilling Engineer Prepared By Name/Number: Si nature Phone 564-4694 Date' ~~ a /o Terrie Hubble, 564-4628 Commission Use Only Permit To Drill Number: -. Q API Number: 50- 029-20553-03-00 Permit Ap ro I Date: -~b(,Q See cover letter for other requirements Conditions of Approval: S mples Required ^ Yes~No Mud Log Required =; Yes~'No Hydrogen Sulfide Measures Yes ;_; No Directional Survey Required ~'S'es ^ No Other: Ti°S~ l3o ('E 'E"o SOD ~~-~.~ , APPROVED BY ~ ~+ A roved B THE COMMISSION Date J Form 10-401 Revised 06/204 ~ ,` ~ ~` ~ ~\ I /~ I Submit In Duplicate • BP Prudhoe Bay G-lOC CTD Sidetrack CTD Sidetrack 5ummarv Rig Work: 1) MIRU Nordic 1 and test BOPE to 250 psi low and 3500 psi high. ~ 2) Mi112.74" window through two strings in Zone 2 at 9470' MD (8608ss). 3) Dri113" open hole, 2,655' sidetrack into Zone 1B target with TD at 12,125'MD (8966ss). 4) Run solid 2 3/8" liner, cement and test to 2000 psi. ~ 5) Cleanout liner and perforate for production (--800 ft of perfs). 6) Freeze protect well and RDMO. Mud Program: • Well kill: 8.5 ppg b • Milling/drilling: .6 pg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Casing Program: • 2 3/8", 4.6#, L- , ~ T-L fully cemented liner. Top of liner to be at 9,425' MD (8575ss). ~ • A minimum 13 is 15.8 ppg cement will be used for liner cementing. Note: The very short liner lap is designe provide room for a future sidetrack. A retrievable liner top packer will be installed-~' to seal the liner lap and cover squeeze hole in the 3'h" tubing. Well Control: .BOP diagram is attached. Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. / The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property -13,600 ft. • Distance to nearest well within pool -1000 ft. (G-27) Logging • MWD directional and Gamma Ray will be run over all of the open hole section. MCNL log will be run across the cemented liner. Hazards • The maximum recorded H2S level on G Pad is 20 ppm (G-29 on 9/3/05). • Lost circulation risk is moderate. Reservoir Pressure • Res. press. is estimated to be 3200 psi at 8800'ss (7.0 ppg EMW). Max. surface pressure with gas (0.10 psi/ft) to surface is 2320 psi. TREE = 31/8" FMC W /4" QU WB_LHEAD = McEVOY ACTUATOR = AXELSON KB. ELEV = 70.3' BF. EL.EI/ = 32.27' KOP = 3205' Max Ang)e = 98 @ 11091' Datum MD = 9745' Datum ND = 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12.347" H 2686' TOP OF 7" SCAB LNR H 4149' Minimum ID = 1.995" @ 9507 I 2-3/4" X 2-3/8" XO 7"SCAB LNR 29#, L-80, .371 bpf, ID = 6.814" 8064' TOPOF7" LNR 8064' 9-518" CSG, 47#, L-80, ID = 8.681" H 8250' TOP OF WHIPSTOCK 9620• cIBP (os/1oro2) i--i 9680• ' 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" N 10235' 41/2" LNR, 15#, 138CR..0188 bpf, ID =4283^ 11170' PERFORATION SUMMARY R~ LOG: SPERRY SUN MWD / SWS MCNL/GR ANGLEATTOPPERF 59 @ 9924' Note: Referto Roducfon 06 for historical rf data SIZE SPF INTERVAL OPN/SOZ DATE 1-9/16" 4 9924 -9939 O 08!23/03 1-9/16" 6 9980- 10030 O 01/14/03 1-9/16" 4 10185 - 10420 O 06!29!02 1-9/16" 4 10450- 10530 O 06!29/02 1-9/16" 6 10630- 10705 O 01/14/03 1-9/16" 4 10795- 10945 O 06!29/02 1-9/16" 4 10990 - 11015 O 06/29/02 1-9/16" 4 11050 - 11100 O 06!29/02 G-10 B ~ SAFETY NOTES: CHROME LINER ~ 2201 • ~ 3112" FES XBD SSSV LAND NIP, ID = 2.75" 2604' 9-5/8" Dv FKR GAS LIFT MANDR~S ST MD ND OEV TYPE VLV LATCH PORT DATE 2 1 3918 4039 3878 3984 28 30 FMHO FMHO CMY DMY RK RK 06/07/02 06/07/02 4072' 9-5/8" X 3-1l2" BKR SABL-3 PKR W/KBH-22 ANCHOR SEALASSY, ID= 3.93" 4157' 9-5/8" X 7" BA KER LNR PKR, ID = 6.187" 8072' H 9-5/8" X 7" BA KER LNR PKR, ID = 6.187" 9501' f--j 3" BKRDEFLOYMENTSLV, ID=2.250" 9507' 2-3/4" X 2-3/8" XO, ID = 1.995" ELMD TT NOT LOGGED 11204' H PBTD i 2-3/8" LNfj 4.7#, L-80, .0039 bpf, D= 1.995" i DATE REV BY OOMMENTS DOTE REV BY COMMENTS 04/81 ORIGINAL COMPLETION 09/22!<13 CMO/TLP DATIaN MD 8 PERFANGLE 06/25/95 SIDETRACK G-10A 02J04~04 CMO/TLP PB~FANGLECORRECTiON O6/30/02 JLM/KK CTDSIDETRACK G-10 04/02105 DAV/TLH LNR TOPPKRPULL® 01/14/03 KEY/tih ADDPERFS 07/13/03 CMO/TLP KB a EVATION CORRECTION 08/23/03 BJIWKK ADD PERFS PRUDHOEBAY l1NfT WELL: G-108 POtMIT No: 2021170 API No: 50-029.2055302 SEC 12, T11N, R13E, 2554' SNL &2368' WEL BP Exploration (Alaska) TREE= 3-1/8" FMC W/4" QU WELLHEAD= McEVOY ACTUATOR = AXELSON KB. ELEV = 70.3' BF. ELEV = 32.27' KOP = 3205' Max Angle = _ __9.8_@__ 11091' Datum MD = 9745' Datum TV D = 8800' SS ~ 13-3/8" CSG, 72#, N-80, ID = 12.347" ~ TOP OF 7" SCAB LNR l~ 41 Minimum ID = 1.995" @ 9507 2-3/4" X 2-3/8" XO 7" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" -~ TOP OF 7" LNR 1~ 9-5/8" CSG, 47#, L-80, ID = 8.681" 9182' NOTES: CHROME LINER ~ 3-1/2" HES XBD SSSV LAND NIP, ID = 2.75" ~ 9-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 3918 4039 3878 3984 28 30 FMHO FMHO DMY DMY RK RK 06/07/02 06/07/02 4072' 9-5/8" X 3-1/2" BKR SABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY, ID = 3.93" 4157' 9-5l8" X 7" BAKER LNR PKR, ID = 6.187" 8072' ~-j 9-5/8" X 7" BAKER LNR PKR, ID = 6.187" 9-5/8" SIDETRACK WINDOW 8250' - 8300' 9240' Liner Top Pkr~ ~ 9250' -1Tbg Punch (9250-9254) PERFORATION SUMMARY REF LOG: SPERRY SUN MWD / SWS MCNUGR ~ 9425' Top of 2-3/8" Liner ANGLE AT TOP PERF: 59 @ 9924' 9425' Top of Cement Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OPWSOZ DATE 1-9/16" 4 9924 - 9939 isolated proposed 1-9/16" 6 9980 - 10030 isolated proposed 1-9/16" 4 10185 - 10420 isolated proposed 1-9/16" 4 10450 - 10530 isolated proposed 1-9/16" 6 10630 - 10705 isolated proposed 1-9/16" 4 10795 - 10945 isolated proposed 1-9/16" 4 10990 - 11015 isolated proposed 1-9/16" 4 11050 - 11100 isolated orooosed Baker S-3 Packer, ID = 3.93" 9740' 3-1/2" tbg, 9.2#, L-80, ID = 2.99" 9787' TOP OF 4.5" LNR 10107' 7" LNR, 29#, L-80, .371 bpf, ID = 6.814" 10235' 4-1/2" LNR 15#, 13-8CR, .0188 bpf, ID=4.283" ~~ 11170' 2-3/8" cmt'ed and perfed , (L (L 9470' Mech Whipstock w / R/A tag , wG~ ;IBP at 9485' 9493' Tbg Punch 9493-9497 9501' 3" Bkr Deployment Sleeve ~R -< Pe~S 9 9'S to 1~ 10 ' o~ 11 bpf, ID = 1.995" ~-i 11241' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/81 ORIGINAL COMPLETION 09/22/03 CMOITLP DATUM MD & PERF ANGLE 06/25/95 SIDETRACK (G-10A) 02/04/04 CMO/TLP PERF ANGLE CORRECTION 06/30/02 JLM/KK CTD SIDETRACK (G-106) 04/02/05 DAV/TLH LNR TOP PKR PULLED 01/14/03 KEY/tlh ADD PERFS 07/13/03 CMO/TLP KB ELEVATION CORRECTION 08/23/03 BJM/KK ADD PERFS PRUDHOE BAY UNff WELL: G-10B PERMIT No: 2021170 API No: 50-029-20553-02 SEC 12, T11N, R13E, 2554' SNL & 2368' WEL BP 6cploration (Alaska) G-10C Proposed CTD Sidetrack I ® I • • BP Alaska ~';~ ,._4 ~.. ~~~ max. id cr ~~ ;a ~~ 8&;~ euL iQ7 ,;~8 ~ ~i~a~s z~ by rr.c,t z~ AM ! ~' by BP Alaska Baker Hughes INTEQ Planning Report ~.. sus INTEQ Company: BP Amoco . Date: 1/9/2006 Times 10:35:32 Page: 1 Field: Pnldhoe 68y Co-ordiwte(NE) Reference: ' We1L• Cr10, True North .Site: PB G Pad Vertical (TVD) Reference: G-10A 70.3 Well: G-10 Section (VS) Reference: Weil (O.OON,O.QOE,120.OOAzi) Wellpath: Plan 2, G-10C Survey Cakalation Method: Minimum Curvature I)b: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB G Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5966832.87 ft Latltude: 70 18 58.211 N From: Map Easting: 656301 .39 ft Longitude: 148 43 59.013 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.19 deg Well: G-10 Slot Name: G-10 Well Position: +N/S 2222.37 ft Northing: 5969088.00 ft Latitude: 70 19 20.067 N +E/-W 1604.34 ft Eastlng : 657859.00 ft Longitude: 148 43 12.191 W Position Uncertainty: 0.00 ft Wellpath: Plan 2, G-10C Drilled Froro: G-10A 500292055303 Tie-on Depth: 9458.57 ft Current Datum: G-10A Height 70.34 ft Above System Datum: Mean Sea Level Magnetic Date: 1/8/2006 Declination: 24.65 deg Field Strength: 57605 nT Mag Dip Angle: 80.90 deg Vertical Sectlon: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.85 0.00 0.00 120.00 Plan: Plan #2 Dste Composed: 1/8/2006 Copy Lamar's PIan2, use Compass survey Version: 4 Principal: Yes Tied-to: From: Definitive Path Targets Map Map ~-_~- Latltude ----> <-- Longitnde -> Name Description TVD +N/-S +E/-W Northing Eastlag Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft G-10C Polygon 70.34 -1303.74 -1171.76 5967760.00 656715.00 70 19 7.244 N 148 43 46.382 W -Polygon 1 70.34 -1303.74 -1171.76 5967760.00 656715.00 70 19 7.244 N 148 43 46.382 W -Polygon 2 70.34 -1400.50 -613.64 5967675.00 657275.00 70 19 6.292 N 148 43 30.096 W -Polygon 3 70.34 -2135.23 76.11 5966955.00 657980.00 70 18 59.067 N 148 43 9.970 W -Polygon 4 70.34 -2236.31 364.07 5966860.00 658270.00 70 18 58.073 N 148 43 1.568 W -Polygon 5 70.34 -2460.28 74.28 5966630.00 657985.00 70 18 55.870 N 148 43 10.023 W -Polygon 6 70.34 -1663.36 -719.20 5967410.00 657175.00 70 19 3.707 N 148 43 33.175 W -Polygon 7 70.34 -1408.09 -1203.97 5967655.00 656685.00 70 19 6.217 N 148 43 47.321 W G-10C Faultl 70.34 -1040.63 -1791.41 5968010.00 656090.00 70 19 9.830 N 148 44 4.465 W -Polygon 1 70.34 -1040.63 -1791.41 5968010.00 656090.00 70 19 9.830 N 148 44 4.465 W -Polygon 2 70.34 -1297.43 -1471.72 5967760.00 656415.00 70 19 7.305 N 148 43 55.135 W -Polygon 3 70.34 -1682.99 -974.68 5967385.00 656920.00 70 19 3.514 N 148 43 40.630 W -Polygon 4 70.34 -1297.43 -1471.72 5967760.00 656415.00 70 19 7.305 N 148 43 55.135 W G-10C Fault3 70.34 -1688.73 -939.79 5967380.00 656955.00 70 19 3.457 N 148 43 39.612 W -Polygon 1 70.34 -1688.73 -939.79 5967380.00 656955.00 70 19 3.457 N 148 43 39.612 W -Polygon 2 70.34 -1807.60 -757.24 5967265.00 657140.00 70 19 2.289 N 148 43 34.285 W G-10C Fault2 70.34 -1211.65 -1269.86 5967850.00 656615.00 70 19 8.149 N 148 43 49.245 W -Polygon 1 70.34 -1211.65 -1269.86 5967850.00 656615.00 70 19 8.149 N 148 43 49.245 W -Polygon 2 70.34 -1181.01 -824.08 5967890.00 657060.00 70 19 8.451 N 148 43 36.237 W G-10C Fault4 70.34 -2066.04 -597.63 5967010.00 657305.00 70 18 59.747 N 148 43 29.627 W -Polygon 1 70.34 -2066.04 -597.63 5967010.00 657305.00 70 18 59.747 N 148 43 29.627 W -Polygon 2 70.34 -1590.58 -612.63 5967485.00 657280.00 70 19 4.423 N 148 43 30.066 W G-10C Fault6 70.34 -2268.16 -261.78 5966815.00 657645.00 70 18 57.759 N 148 43 19.828 W -Polygon 1 70.34 -2268.16 -261.78 5966815.00 657645.00 70 18 57.759 N 148 43 19.828 W -Polygon 2 70.34 -2592.37 -303.61 5966490.00 657610.00 70 18 54.571 N 148 43 21.048 W G-10C FaultB 70.34 -2582.16 161.74 5966510.00 658075.00 70 18 54.671 N 148 43 7.472 W -Polygon 1 70.34 -2582.16 161.74 5966510.00 658075.00 70 18 54.671 N 148 43 7.472 W -Polygon 2 70.34 -2822.70 421.76 5966275.00 658340.00 70 18 52.305 N 148 42 59.886 W by BP Alaska Baker Hughes INTEQ Planning Report ~.. g~~s INTEQ Company: BP Amooo Datc: , 1/8/2006 Time: 10:35:32 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-10, True North Site: PB G Pad Vertical (1'VD) Reference: G-10A 70.3 Well: G-10 Section (VS) Reference: Weil {O.OON,O.OpE,120. 00Azi) Wellpath: Plan 2, G-10C Survey Calculation Method: Minimum Curvature Db: OraGe Targets .....Map Map.. ~- LaNtnde -~-~ 4- Longitude --> I Name Description TVD +N/-S +E/-W Northing Fasting Deg Min See Deg Min Sec Dip. Dhv ft_ ft ft ft ft i G-10C Fault9 70.34 -2050.98 112.90 5967040.00 658015.00 70 18 59.895 N 148 43 8.897 W -Polygon 1 70.34 -2050.98 112.90 5967040.00 658015.00 70 18 59.895 N 148 43 8.897 W -Polygon 2 70.34 -2165.27 790.69 5966940.00 658695.00 70 18 58.771 N 148 42 49.121 W G-10C Fault? 70.34 -1379.40 X28.14 5967700.00 657460.00 70 19 6.500 N 148 43 24.683 W -Polygon 1 70.34 -1379.40 X28.14 5967700.00 657460.00 70 19 6.500 N 148 43 24.683 W -Polygon 2 70.34 -1694.77 60.37 5967395.00 657955.00 70 19 3.399 N 148 43 10.429 W G-10C Faults 70.34 -1882.59 -283.68 5967200.00 657615.00 70 19 1.551 N 148 43 20.467 W -Polygon 1 70.34 -1882.59 -283.68 5967200.00 657615.00 70 19 1.551 N 148 43 20.467 W -Polygon 2 70.34 -2176.22 -114.81 5966910.00 657790.00 70 18 58.664 N 148 43 15.540 W G-10C Target2 9037.34 -1396.71 -936.65 5967672.00 656952.00 70 19 6.329 N 148 43 39.521 W G-10C Target3 9037.34 -2286.05 112.95 5966805.00 658020.00 70 18 57.584 N 148 43 8.895 W G-10C Targetl 9042.34 -1349.42 -1139.72 5967715.00 656748.00 70 19 6.794 N 148 43 45.447 W Annotation MD_ TVD ft ft 9458.57 8670.67 TIP 9470.00 8678.85 KOP 9490.00 8692.78 End of 9 Deg/100' DLS 9717.36 8815.75 4 10017.36 8928.25 5 10242.36 9004.24 6 10502.86 9042.00 7 10602.86 9038.88 8 10702.86 9037.16 9 11202.86 9036.51 10 11352.86 9036.47 11 11452.86 9036.51 12 11727.86 9036.59 13 12125.00 9036.69 TD Plan Section Inforrostion MD Intl Azim TVD +N/-S +EI-W DLS Bnih1 Turo TFO `Target ft deg deg ft ft ft deg/100ft degl100ft deg/100ft deg 9458.57 43.55 58.56 8670.67 -1274.73 -2046.87 0.00 0.00 0.00 0.00 9470.00 45.07 58.82 8678.85 -1270.59 -2040.05 13.39 13.30 2.27 6.91 9490.00 46.64 60.06 8692.78 -1263.29 -2027.69 9.00 7.83 6.19 30.00 9717.36 68.00 80.52 8815.75 -1203.55 -1848.72 12.00 9.40 9.00 45.00 10017.36 69.48 119.22 8928.25 -1250.78 -1580.03 12.00 0.49 12.90 95.00 10242.36 71.80 90.67 9004.24 -1304.46 -1377.45 12.00 1.03 -12.69 270.00 10502.86 91.70 115.17 9042.00 -1362.72 -1129.71 12.00 7.64 9.40 53.00 10602.86 91.87 103.16 9038.88 -1395.47 -1035.47 12.00 0.17 -12.00 271.00 10702.86 90.09 91.29 9037.16 -1408.02 -936.46 12.00 -1.78 -11.87 261.60 11202.86 90.05 151.29 9036.51 -1656.01 -528.45 12.00 -0.01 12.00 90.00 11352.86 89.98 133.29 9036.47 -1774.19 -437.08 12.00 -0.04 -12.00 269.80 11452.86 89.98 121.29 9036.51 -1834.66 -357.67 12.00 0.00 -12.00 270.00 11727.86 89.98 154.29 9036.59 -2035.55 -175.46 12.00 0.00 12.00 90.00 12125.00 89.99 106.63 9036.69 -2285.91 118.06 12.00 0.00 -12.00 270.00 by C7 BP Alaska • Baker Hughes INTEQ Planning Report ~.r is s INTEQ Company: BP AmoCO `Date: 1/8/2006 Time: 10:35:32 Page: 3 Field: Prudhoe Bay - Ca-ordinataNE) Reference: Weil: G-10, True North Site: PB G Pad Vertical (TVD) Refenwce: G-10A 70.3 Weli: G-10 Section (VS) References Well (O.OON,O.OOE,120.OOAzi) Weltpsth: Plan 2, G-10G Snrvey Calculation Method: Minimum Curvature Db: OraGe Survey MD foci Azim Sya TVD N/S EIW MapN MapE DLS VS TFO Tool ft deg deg ft ft ft , 8 tt - deg/100ft ft ' deg 9458.57 43.55 58.56 8600.33 -1274.73 -2046.87 5967770.59 655839.54 0.00 -1135.27 0.00 MWD 9470.00 45.07 58.82 8608.51 -1270.59 -2040.05 5967774.88 655846.28 13.39 -1131.44 6.91 MWD 9490.00 46.64 60.06 8622.44 -1263.29 -2027.69 5967782.43 655858.48 9.00 -1124.38 30.00 MWD 9500.00 47.49 61.21 8629.25 -1259.70 -2021.31 5967786.16 655864.78 12.00 -1120.65 45.00 MWD 9525.00 49.67 63.95 8645.79 -1251.08 -2004.67 5967795.13 655881.23 12.00 -1110.55 44.22 MWD 9550.00 51.92 66.52 8661.59 -1242.97 -1987.08 5967803.60 655898.65 12.00 -1099.37 42.40 MWD 9575.00 54.21 68.94 8676.62 -1235.40 -1968.59 5967811.55 655916.97 12.00 -1087.14 40.78 MWD 9600.00 56.56 71.22 8690.82 -1228.40 -1949.24 5967818.96 655936.16 12.00 -1073.89 39.32 MWD 9625.00 58.94 73.37 8704.16 -1221.98 -1929.10 5967825.81 655956.16 12.00 -1059.67 38.03 MWD 9650.00 61.35 75.42 8716.60 -1216.15 -1908.22 5967832.07 655976.92 12.00 -1044.49 36.88 MWD 9675.00 63.80 77.38 8728.12 -1210.94 -1886.66 5967837.74 655998.37 12.00 -1028.42 35.86 MWD 9700.00 66.27 79.26 8738.67 -1206.35 -1864.46 5967842.79 656020.46 12.00 -1011.50 34.95 MWD 9717.36 68.00 80.52 8745.41 -1203.55 -1848.72 5967845.92 656036.14 12.00 -999.26 34.16 MWD 9725.00 67.92 81.51 8748.28 -1202.44 -1841.72 5967847.18 656043.11 12.00 -993.76 95.00 MWD 9750.00 67.71 84.74 8757.72 -1199.67 -1818.74 5967850.43 656066.02 12.00 -975.24 94.63 MWD 9775.00 67.57 87.98 8767.23 -1198.20 -1795.67 5967852.39 656089.05 12.00 -956.00 93.41 MWD 9800.00 67.48 91.22 8776.79 -1198.04 -1772.58 5967853.03 656112.14 12.00 -936.08 92.18 MWD 9825.00 67.47 94.47 8786.37 -1199.18 -1749.52 5967852.37 656135.22 12.00 -915.53 90.94 MWD 9850.00 67.52 97.72 8795.94 -1201.64 -1726.55 5967850.40 656158.23 12.00 -894.42 89.69 MWD 9875.00 67.63 100.96 8805.48 -1205.39 -1703.75 5967847.13 656181.10 12.00 -872.80 88.45 MWD 9900.00 67.81 104.20 8814.96 -1210.42 -1681.18 5967842.57 656203.77 12.00 -850.73 87.21 MWD 9925.00 68.05 107.42 8824.36 -1216.73 -1658.89 5967836.73 656226.18 12.00 -828.28 85.98 MWD 9950.00 68.36 110.64 8833.64 -1224.30 -1636.95 5967829.63 656248.28 12.00 -805.49 84.77 MWD 9975.00 68.72 113.84 8842.79 -1233.11 -1615.42 5967821.28 656269.99 12.00 -782.44 83.58 MWD 10000.00 69.15 117.02 8851.78 -1243.12 -1594.36 5967811.71 656291.26 12.00 -759.19 82.41 MWD 10017.36 69.48 119.22 8857.91 -1250.78 -1580.03 5967804.36 656305.74 12.00 -742.96 81.26 MWD 10025.00 69.48 118.24 8860.59 -1254.22 -1573.76 5967801.05 656312.08 12.00 -735.81 270.00 MWD 10050.00 69.53 115.04 8869.35 -1264.72 -1552.83 5967791.00 656333.22 12.00 -712.43 270.34 MWD 10075.00 69.63 111.84 8878.07 -1274.03 -1531.34 5967782.13 656354.91 12.00 -689.16 271.46 MWD 10100.00 69.80 108.64 8886.74 -1282.14 -1509.34 5967774.49 656377.07 12.00 -666.05 272.58 MWD 10125.00 70.02 105.46 8895.33 -1289.03 -1486.90 5967768.08 656398.65 12.00 -643.18 273.69 MWD 10150.00 70.30 102.28 8903.82 -1294.66 -1484.07 5967762.92 656422.59 12.00 -620.59 274.78 MWD 10175.00 70.63 99.12 8912.18 -1299.04 -1440.92 5967759.04 656445.82 12.00 -598.36 275.86 MWD 10200.00 71.02 95.97 8920.39 -1302.14 -1417.52 5967756.43 656469.29 12.00 -576.54 276.92 MWD 10225.00 71.46 92.84 8928.43 -1303.95 -1393.92 5967755.11 656492.92 12.00 -555.19 277.95 MWD 10242.36 71.80 90.67 8933.90 -1304.46 -1377.45 5967754.96 656509.39 12.00 -540.68 278.96 MWD 10250.00 72.35 91.44 8936.25 -1304.59 -1370.18 5967754.97 656516.66 12.00 -534.32 53.00 MWD 10275.00 74.18 93.92 8943,45 -1305.71 -1346.27 5967754.36 656540.59 12.00 -513.05 52.76 MWD 10300.00 76.04 96.36 8949.88 -1307.88 -1322.21 5967752.70 656564.68 12.00 -491.13 52.05 MWD 10325.00 77.92 98.76 8955.51 -1311.08 -1298.07 5967750.00 656588.89 12.00 -468.62 51.42 MWD 10350.00 79.83 101.12 8960.33 -1315.32 -1273.91 5967746.28 656613.13 12.00 -445.58 50.88 MWD 10375.00 81.74 103.46 8964.34 -1320.57 -1249.80 5967741.53 656637.34 12.00 X22.07 50.43 MWD 10400.00 83.68 105.77 8967.51 -1326.83 -1225.81 5967735.78 656661.46 12.00 -398.17 50.05 MWD 10425.00 85.62 108.07 8969.84 -1334.07 -1202.00 5967729.04 656685.41 12.00 -373.93 49.76 MWD 10450.00 87.57 110.35 8971.33 -1342.28 -1178.43 5967721.33 656709.14 12.00 -349.41 49.54 MWD 10475.00 89.52 112.63 8971.96 -1351.43 -1155.18 5967712.67 656732.58 12.00 -324.70 49.41 MWD 10500.00 91.48 114.90 8971.74 -1361.51 -1132.31 5967703.08 656755.66 12.00 -299.85 49.35 MWD 10502.86 91.70 115.17 8971.66 -1362.72 -1129.71 5967701.92 656758.28 12.00 -297.00 49.37 MWD 10525.00 91.74 112.51 8971.00 -1371.66 -1109.47 5967693.41 656778.70 12.00 -275.00 271.00 MWD 10550.00 91.79 109.51 8970.23 -1380.62 -1086.15 5967684.94 656802.21 12.00 -250.33 270.92 MWD 10575.00 91.83 106.51 8969.44 -1388.34 -1062.39 5967677.72 656826.12 12.00 -225.89 270.83 MWD 10600.00 91.87 103.50 8968.63 -1394.81 -1038.26 5967671.76 656850.38 12.00 -201.75 270.73 MWD 10602.86 91.87 103.16 8968.54 -1395.47 -1035.47 5967671.16 656853.18 12.00 -199.01 270.64 MWD 10625.00 91.48 100.53 8967.89 -1400.01 -1013.82 5967667.08 656874.92 12.00 -177.99 261.60 MWD 10650.00 91.04 97.56 8967.34 -1403.94 -989.14 5967663.67 656899.68 12.00 -154.65 261.52 MWD 10675.00 90.59 94.60 8866.98 -1406.59 -964.28 5967661.54 656924.58 12.00 -131.80 261.46 MWD 10700.00 90.14 91.63 8966.83 -1407.94 -939.32 5967660.71 656949.56 12.00 -109.51 261.42 MWD 10702.86 90.09 91.29 8966.82 -1408.02 -936.46 5967660.70 656952.42 12.00 -106.99 261.40 MWD by BP Alaska Baker Hughes INTEQ Planning Report ~~~ sus INTEQ Compsay: BP Amoco Date: 1/9/2006 Timc: 10:35:32 Page: 4 Field: Prudhoe Bay ;- Co-ordinate(NE)Re[erence: Well: G-10, True North Site: PB G Pad Vertical (TVD) ltefereoce: G-10A 70.3 Well: G-10 Section (VS) Reference: Well (O.OON,Q.OOE,120.OOAzi) Weilpath: Plan 2, G-10C Survey Calculation Metbod: Minimum Curvature Db: "Orate Survey MD Incl Azim Sys TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 10725.00 90.09 93.95 8966.78 -1409.03 -914.35 5967660.15 656974.55 12.00 -87.34 90,00 MWD 10750.00 90.09 96.95 8966.75 -1411.40 -889.47 5967658.30 656999.48 12.00 -64.60 90,00 MWD 10775.00 90.09 99.95 8966.71 -1415.07 -864.74 5967655.15 657024.28 12.00 X1.35 90.01 MWD 10800.00 90.09 102.95 8966.67 -1420.04 -840.24 5967650.71 657048.87 12.00. -17.65 90.01 MWD 10825.00 90.09 105.95 8966.63 -1426.27 -816.03 5967644.98 657073.20 12.00 6.43 90.02 MWD 10850.00 90.09 108.95 8966.59 -1433.77 -792.19 5967637.99 657097.20 12.00 30.83 90.02 MWD 10875.00 90.08 111.95 8966.55 -1442.50 -768.76 5967629.75 657120.80 12.00 55.48 90.03 MWD 10900.00 90.08 114.95 8966.52 -1452.45 -745.83 5967620.29 657143.94 12.00 80.31 90.03 MWD 10925.00 90.08 117.95 8966.48 -1463.58 -723.45 5967609.63 657166.54 12.00 105.26 90.04 MWD 10950.00 90.08 120.95 8966.45 -1475.87 -701.68 5967597.80 657188.56 12.00 130.26 90.04 MWD 10975.00 90.08 123.95 8966.41 -1489.28 -680.59 5967584.84 657209.93 12.00 155.23 90.04 MWD 11000.00 90.07 126.95 8966.38 -1503.78 -660.22 5967570.78 657230.60 12.00 180.12 90.05 MWD 11025.00 90.07 129.95 8966.35 -1519.32 -640.65 5967555.65 657250.50 12.00 204.84 90.05 MWD 11050.00 90.07 132.95 8966.32 -1535.87 -621.91 5967539.50 657269.57 12.00 229.34 90.06 MWD 11075.00 90.06 135.95 8966.29 -1553.37 -604.07 5967522.38 657287.78 12.00 253.55 90.06 MWD 11100.00 90.06 138.95 8966.26 -1571.79 -587.16 5967504.32 657305.07 12.00 277.40 90.06 MWD 11125.00 90.06 141.95 8966.24 -1591.06 -571.24 5967485.39 657321.39 12.00 300.82 90.07 MWD 11150.00 90.05 144.95 8966.21 -1611.14 -556.36 5967465.63 657336.69 12.00 323.75 90.07 MWD 11175.00 90.05 147.95 8966.19 -1631.97 -542.54 5967445.09 657350.94 12.00 346.13 90.07 MWD 11200.00 90.05 150.95 8966.17 -1653.50 -529.83 5967423.84 657364.10 12.00 367.90 90.08 MWD 11202.86 90.05 151.29 8966.17 -1656.01 -528.45 5967421.37 657365.53 12.00 370.35 90.08 MWD 11225.00 90.04 148.63 8966.15 -1675.17 -517.37 5967402.44 657377.01 12.00 389.53 269.80 MWD 11250.00 90.03 145.63 8966.14 -1696.17 -503.81 5967381.73 657391.02 12.00 411.77 269.80 MWD 11275.00 90.01 142.63 8966.13 -1716.42 -489.16 5967361.79 657406.08 12.00 434.59 269.80 MWD 11300.00 90.00 139.63 8966.13 -1735.89 -473.47 5967342.66 657422.17 12.00 457.90 269.80 MWD 11325.00 89.99 136.63 8966.13 -1754.50 -456.79 5967324.40 657439.24 12.00 481.66 269.80 MWD 11350.00 89.98 133.63 8966.13 -1772.22 -439.16 5967307.06 657457.25 12.00 505.79 269.80 MWD 11352.86 89.98 133.29 8966.13 -1774.19 -437.08 5967305.14 657459.36 12.00 508.57 269.80 MWD 11375.00 89.98 130.63 8966.14 -1788.99 (120.62 5967290.69 657476.13 12.00 530.23 270.00 MWD 11400.00 89.98 127.63 8966.15 -1804.77 -401.23 5967275.32 657495.85 12.00 554.91 270.00 MWD 11425.00 89.98 124.63 8966.16 -1819.51 -381.04 5967261.01 657516.34 12.00 579.76 270.00 MWD 11450.00 89.98 121.63 8966.17 -1833.17 -360.11 5967247.79 657537.55 12.00 604.72 270.00 MWD 11452.86 89.98 121.29 8966.17 -1834.66 -357.67 5967246.35 657540.02 12.00 607.58 270.00 MWD 11475.00 89.98 123.95 8966.17 -1846.60 -339.02 5967234.81 657558.91 12.00 629.69 90.00 MWD 11500.00 89.98 126.95 8966.18 -1861.09 -318.66 5967220.75 657579.58 12.00 654.58 90.00 MWD 11525.00 89.98 129.95 8966.19 -1876.64 -299.08 5967205.62 657599.47 12.00 679.30 90.00 MWD 11550.00 89.98 132.95 8966.20 -1893.18 -280.35 5967189.47 657618.55 12.00 703.80 90.00 MWD 11575.00 89.98 135.95 8966.21 -1910.69 -262.50 5967172.35 657636.76 12.00 728.01 90.00 MWD 11600.00 89.98 138.95 8966.21 -1929.10 -245.60 5967154.30 657654.05 12.00 751.86 90.00 MWD 11625.00 89.98 141.95 8966.22 -1948.38 -229.68 5967135.36 657670.37 12.00 775.28 89.99 MWD 11650.00 89.98 144.95 8966.23 -1968.46 -214.79 5967115.60 657685.67 12.00 798.21 89.99 MWD 11675.00 89.98 147.95 8966.24 -1989.29 -200.98 5967095.07 657699.92 12.00 820.59 89.99 MWD 11700.00 89.98 150.95 8966.24 -2010.82 -188.27 5967073.81 657713.08 12.00 842.36 89.99 MWD 11725.00 89.98 153.95 8966.25 -2032.98 -176.71 5967051.90 657725.10 12.00 863.46 89.99 MWD 11727.86 89.98 154.29 8966.25 -2035.55 -175.46 5967049.35 657726.41 12.00 865.82 89.99 MWD 11750.00 89.98 151.63 8966.26 -2055.27 -165.40 5967029.85 657736.88 12.00 884.40 270.00 MWD 11775.00 89.98 148.63 8966.26 -2076.95 -152.95 5967008.44 657749.78 12.00 906.02 270.00 MWD 11800,00 89.98 145.63 8966.27 -2097.94 -139.38 5966987.74 657763.78 12.00 928.26 270.00 MWD 11825.00 89.98 142.63 8966.28 -2118.20 -124.74 5966967.80 657778.85 12.00 951.08 270.00 MWD 11850.00 89.99 139.63 8966.28 -2137.66 -109.05 5966948.67 657794.94 12.00 974.39 270.00 MWD 11875.00 89.99 136.63 8966.29 -2156.28 -92.37 5966930.41 657812.01 12.00 998.15 270.00 MWD 11900.00 89.99 133.63 8966.30 -2174.00 -74.73 5966913.07 657830.01 12.00 1022.28 270.00 MWD 11925.00 89.99 130.63 8966.30 -2190.77 -56.20 5966896.69 657848.90 12.00 1046.72 270.01 MWD 11950.00 89.99 127.63 8966.31 -2206.54 -36.81 5966881.33 657868.61 12.00 1071.40 270.01 MWD 11975.00 89.99 124.63 8966.31 -2221.28 -16.62 5966867.02 657889.10 12.00 1096.25 270.01 MWD 12000.00 89.99 121.63 8966.32 -2234.95 4.31 5966853.80 657910.32 12.00 1121.21 270.01 MWD 12025.00 89.99 118.63 8966.33 -2247.50 25.93 5966841.71 657932.19 12.00 1146.21 270.01 MWD • by BP Alaska Baker Hughes INTEQ Planning Report ~t~ B~tr~s INTEQ Company: BPAmoar' Date: 1/9/2006 Time: 10135:32 Page: 5 Wield: Prudhoe$ay Co-ordioate(NE)Reference: Weil G-10, TrueNoRh Site:.. Pli G Pad Vertical (TVD) Reference: G-10A 70.3 Well: G-10 Section (VS) Reference: Well (O:OON,O.OOE,120:OOAzi) Wellpath: Plan 2, G-tt)C Survey Calculation Metbod: Minimum Curvature Db: Oracle Survey MD Intl Azim SysTVD 1V/S E/W MapN MapE DLS VS TFO Toole ft deg deg ft_ ft ft ft ft deg/100ft ft deg 12050.00 89.99 115.63 8966.33 -2258.90 48.18 5966830.78 657954.67 12.00 1171.17 270.01 MWD 12075.00 89.99 112.63 8966.34 -2269.12 70.99 5966821.04 657977.69 12.00 1196.04 270.01 MWD 12100.00 89.99 109.63 8966.34 -2278.13 94.31 5966812.52 658001.19 12.00 1220.74 270.01 MWD 12125.00 89.99 106.63 8966.35 -2285.91 118.06 5966805.24 658025.11 12.00 1245.20 270.01 MWD • ~ TERRIE L NUBBLE BP EXPLORATION AK INC "nAastercard Check" PO BOX 196612 M8 7-5 ANCHORAGE, AK 99519-6612 PAY TO THE ORDER OF First National Bank Alaska v ~ ~.- Anchorage, A//K''``~~((9~~950~~1 MEMO' Il/d.~ ~:~25200060~:99L4~~~6227~~~i556~1' 0249 89-6/1252 249 DATE -~~ ~ lam. ~ S • • • TRANSMITTAL LETTER CHECKLIST WELL NAME p_T7'-~1 ~ !~~ C PTD# .~ ~- d o Q Development Service Exploratory Stratigraphic Test Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be SAMPLE in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev: 1/05/06 C:\jody\transmittal_checklist WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 __ _____ _ Well Name: PRUDHOE BAY UNIT G-10C .......Program DEV____ Well bore seg PTD#:2060090 Company 8P EXPLQRATION~A_LASI(Al INC Initial ClasslType DEV I 1-OIL GeoArea 89Q________ Unit 11650 On1Off Shore ~_ Annular Disposal ^ Administration 1 Pennitfee attached. _ . _ _ .1 Yes . 2 Lease numberappropriake__________________________ _--____ Yes_ ___ 3 Uniquewell-name_and number - - - _ _ _ - Yes - _ - 4 Well-located in a-defnedpool--:--.,.-___---_____- _-_- Yes_ --..____-._ 5 Well located proper distance_from drilling. unit-boundary ... . . . . .:.. . . .. . . . . . . . Yes 6 Well located properdistance_f[om otherwells- - - - - - - Yes i 7 Sufficientabreageavailablein-drillin unit- - - g _...- - - Yes- -----------------.'..._.-.:------------------_-------_----------------.--- 8 If deviated, is-wellbore plat_included . . . .. .. . . .. . . . : . . . . . _ _ . , . - _ _ _ - _ No_ _ - - - - 9 Operator only affected party - - - - _ - _ _ _ - _ - : Yes - - 10 Operator has appropriate_bond in force _ - - - _ - . - Yes _ - - - - . - - . 11 Pecmitcanbeissued__without~nservationorder------------ ------ -.-- Yes- --..--.. .------------- --- ----.---.----.--- --- --, Appr Date 12 Permitcan. be issued without administrative-approval--------- --------.---_- Yes. _...-------- ------------- -- ------------ .----- .----------------- -- RPC 112312006 13 Can permit be approved before 15•day-wait; _ _ _ _ - - : _ _ _ - Yes _ _ 1 14 Well located within area and strata authorized by Injection Order # (put 10# in-comments)-(For. NA- - - : - - - - - - . X 15 All wells within 114_mile area of review ident~ed (For service wel_I only) . . .:.. . . . . . . . . .NA_ - - - - - - - - 16 Pre-produced injectpr_ duration of preproduction I_ess_than 3 m4nths_(F4r service well only) _ - NA_ _ - _ _ - - _ .. - - ACMP_Findingof Consisteney_hasbeenissued-for-thisproject____________________ NA__ -_.-_.______._ -.-._-.- -----____-__--__----- ------_____. Engineering 18 Conductor st[ing_provided - - - - - NA - - - 19 Surface casing_protectsoll-known. USDWs - _ . _ . - . _ _ _ _ _ _ - - ; _ . - _ _ _ _ - NA- - - _ - - - j 20 CMT-vot adeguate_to circulate on conductor & surf_csg - - - - - - . _ _ _ _ . NA- . - 21 CMT-vol adeguate_tp ti@-in long string ko surf csg_ _ _ _ _ _ _ _ _ _ __ _ __ _ _ _ _ _ _ _ _ _ __ NA_ _ :. - .. _ - _ _ _ _ - _ _ _ . - _ 22 CMT-will coyer all know_nproductiye horizons. _ _ . Yes - _ _ _ Adequate excess- - - - - - - - - - - - - - - _ _ - _ _ : _ _ _ _ _ _ _ _ _ _ _ _ _ _ . , - , - - - _ - - - _ _ - 23 Casing desgns adequate fo[ C, T B &-permafrost - - - Yes - - - .. - 24 Adequate tankage.or reserve pit - - Yes CTDII. - - - - - - - - - 25 If a_re-d[ilt, has_a 10-403 for abandonment been approved - - _ - _ _ _ _ _ _ . - Yes - - ; - .. - `.. _ _ _ - - - _ . - : - - - .._ - _ _ _ - . _ _ _ - _ i26 Adequate wellbore separation proposed- - - - - - - Yes - - - - ~27 Jfdiverterrequired,doesitmeetregulations.-.-_-.-._------------------- NA- ---_-Sidet[ack.--------- - ---.-----_ -- _..-- - -------.-----.---.----- Appr Date j28! Dnl_lipgfluitfprdgb~'mschematic&equiplistadequate__--------------- ----- Yes. --.-.-Max~B,lippg.__-_____----- - - ,-.--- ----------------_ WGA 1124/2006 +29 BOPEs,dotheymeetregu!align-_____________ ________-__..-.-__.-. Yes_ ___-_-._-_ ~30 BOPE-press rating appropriate; test to-(pui prig kn comments)_ _ _ _ _ _ _ _ _ _ __ _ _ Yes - _ _ .. - Test to 3500 psi. -NI$F 2320 psi.. - 31 Choke.manifold complies w/API_RP 53 (May 84) _ _ . - _ _ Yes - - _ . 132 Work will ogcur without operation shutdown. _ - . - - Yes - - - - 33 Is presence. gf H2$ gas. probable - - - - - ~ - N° _ - - -- 34 Mechanical.condition of wells within AOR verifed (Fo[senrice well only) - - - _ - - : - - NA- - - Geology ~~35 Permit_can be issued wlo hydrogen_sul_fide measures _ . _ - - _ No_ 36 Rata.ptesentedgnpotentialove_rpressurezones------------------------ NA-- --------------------------- ----------- - -- --------_---- ---- A r Date pp ~37 Seismic analysis_of shallow gas zones - NA RPC 1123!2006 138 Seabed condition survey_(ifoff-shore) - .. _ _ NA- 39 Contact namelphoneforweek!y-progress reports_(exploratoryon!y] - :.. - - NA_ - Geologic Engineering Public Date Date Date: Commissioner: Commissioner Commissioner: • • Well History File APPENDIX • Information of detailed nature that is not particularly germane io the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify rending information, information of this nature is accumulated ai the end of the file under APPENDIX. No special effort has been made to chronologically . organize this category of information. t r Sperry-Sun Drilling Sergices~tapx LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Mar 04 08:57:11 2008 Reel Header Service name .............LISTPE Date . ...................08/03/04 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Tape Header Service name .............LISTPE Date . ...................08/03/04 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: G-lOC 500292055303 BP Exploration (Alaska) Inc. Sperry Drilling Services 04-MAR-08 MWD RUN 1 MWD RUN 2 MWD RUN 3 W-0004429511 W-0004429511 W-0004429511 S. LATZ S. LATZ S. LATZ J. EGBEJIMBA J. EGBEJIMBA J. EGBEJIMBA MWD RUN 4 MWD RUN 6 MWD RUN 7 w-0004429511 w-0004429511 w-0004429511 S. LATZ S. LATZ S. LATZ J. EGBEJIMBA J. EGBEJIMBA J. EGBEJIMBA MWD RUN 8 MWD RUN 9 MWD RUN 10 w-0004429511 w-0004429511 w-0004429511 S. LATZ S. LATZ S. LATZ J. EGBEJIMBA J. EGBEJIMBA J. EGBEJIMBA 12 Page 1 Library. scientific Technical services writing Library. scientific Technical services aC~;-CXS~ ~l(~C~? g-lOc.tapx TOWNSHIP: 11N RANGE: 13E FNL: 2554 FSL: FEL: 2368 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 70.34 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 3.000 4.500 9468.0 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK POSITIONED IN THE G-10 WELLBORE. THE TOP OF THE WHIPSTOCK WAS AT 9468'MD/8607'TVDSS. 4. MWD RUNS 1-10 COMPRISED DIRECTIONAL WITH NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. NO DATA WERE ACQUIRED ON MWD RUN S.DATA GAPS IN THE INTERVAL OF MWD RUNS 3,4 WERE FILLED IN WHILE POOH AFTER REACHING TD ON MWD RUN 6. THESE MAD DATA WERE MERGED WITH THE MWD RUN 6 DATA. 5. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A CASED-HOLE GAMMA RAY PROVIDED TO SDS BY D. DORTCH (SAIC/BP) ON 1/8/08. LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. 6. MWD RUNS 1-4,6-10 REPRESENT WELL G-lOC WITH API #:50-029-20553-03. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12057'MD/8960'TVDSS SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED NATURAL GAMMA RAY. File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.000 Page 2 g-lOc.tapx Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR ROP 1 and clipped curves; all bit runs merged. .5000 START DEPTH STOP DEPTH 9249.0 12023.0 9269.0 12047.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 9249.0 9253.0 9253.5 9259.5 9257.0 9264.0 9259.5 9267.0 9261.5 9269.0 9263.5 9271.0 9268.0 9275.5 9269.0 9276.5 9278.5 9286.0 9283.0 9290.5 9285.0 9292.0 9287.5 9294.5 9289.5 9297.0 9294.0 9301.0 9449.0 9459.0 9455.5 9465.0 9465.0 9474.0 9467.5 9476.5 9475.0 9482.0 9485.5 9494.0 9498.0 9506.0 9505.5 9512.0 9511.0 9517.5 9525.5 9533.0 9527.0 9536.0 9530.0 9538.5 9533.0 9542.0 9537.0 9545.0 9540.0 9548.5 9542.5 9551.0 9544.0 9553.0 9548.5 9556.5 9550.5 9558.5 9570.0 9577.5 9573.0 9580.0 9579.5 9589.0 9583.5 9592.5 9605.0 9614.0 9621.0 9630.5 9623.5 9634.5 9626.5 9636.5 9638.0 9647.0 9650.0 9659.0 9658.0 9667.0 9680.5 9688.5 Page 3 g-lOc.tapx 9688.5 9697.5 9694.0 9704.0 9742.0 9752.5 9747.0 9756.5 9758.5 9768.5 9766.5 9774.5 9774.5 9783.5 9779.5 9789.0 9782.0 9791.0 9786.5 9795.5 9787.5 9796.5 9812.0 9821.5 9817.0 9826.0 9840.5 9847.5 9851.0 9860.0 9854.5 9863.0 9882.0 9891.5 9941.0 9950.5 9946.5 9955.0 9962.0 9970.5 10004.0 10011.0 10008.5 10015.5 10013.5 10022.0 10027.0 10034.5 10040.5 10049.0 10069.0 10076.0 10081.5 10089.5 10100.5 10110.0 10107.5 10117.5 10116.5 10126.0 10120.5 10130.5 10128.0 10137.5 10133.5 10143.5 10163.5 10174.0 10183.5 10193.5 10190.0 10200.0 10193.0 10202.5 10199.0 10209.5 10205.5 10217.0 10207.0 10218.0 10219.5 10230.5 10231.0 10241.0 10236.0 10245.5 10242.0 10252.5 10249.5 10262.0 10271.5 10285.5 10294.0 10304.0 10297.0 10307.5 10306.0 10315.5 10310.0 10319.5 10325.0 10335.0 10339.5 10352.5 10350.0 10363.5 10363.5 10375.5 10402.5 10416.0 10414.0 10427.0 10425.5 10436.5 10430.5 10440.0 10437.0 10446.5 10454.5 10464.0 10459.5 10471.5 10476.5 10487.0 10479.5 10491.0 Page 4 9-lOc.tapx 10512.0 10523.0 10514.5 10526.5 10548.5 10562.0 10562.0 10577.0 10569.0 10582.5 10578.5 10589.0 10583.5 10594.0 10588.5 10598.5 10602.5 10613.0 10650.5 10660.0 10667.5 10677.5 10680.0 10689.0 10696.0 10704.5 10709.0 10717.5 10744.5 10753.0 10760.0 10769.5 10803.0 10812.0 10844.5 10853.5 10853.5 10859.5 10856.5 10862.0 10892.0 10898.5 10895.0 10901.0 10901.0 10907.5 10904.5 10912.0 10911.0 10917.5 10917.0 10925.0 10919.5 10926.0 10922.0 10928.5 10959.5 10964.5 10966.5 10972.0 10973.0 10979.0 10981.0 10989.0 10984.0 10992.5 10999.0 11004.0 11006.0 11009.0 11010.5 11012.0 11015.5 11019.5 11023.5 11025.0 11051.0 11050.0 11063.0 11067.0 11067.0 11070.0 11070.0 11071.5 11074.5 11075.5 11079.5 11081.5 11081.5 11083.5 11094.0 11096.5 11121.5 11130.5 11134.0 11145.0 11146.0 11155.5 11147.0 11156.5 11153.5 11162.0 11163.5 11176.0 11169.5 11179.0 11244.5 11256.0 11266.5 11279.0 11269.0 11281.0 11271.0 11284.5 11278.0 11291.0 11293.0 11303.0 11302.0 11312.0 11329.5 11339.0 11352.0 11362.0 11426.0 11438.5 Page 5 11446.5 11460.0 11470.5 11476.0 11488.0 11498.5 11500.5 11510.5 11577.5 11602.0 11636.5 11642.5 11659.5 11684.0 11690.5 11713.0 11716.0 11720.0 11726.0 11728.5 11733.5 11739.0 11757.0 11792.5 11801.0 11848.5 11891.0 11902.0 11905.0 11909.0 11915.5 11917.0 11935.5 11952.0 11960.5 12046.5 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD MWD MWD REMARKS: 11459.0 11471.5 11481.5 11485.5 11500.0 11509.5 11512.0 11523.0 11590.0 11613.0 11648.0 11654.5 11669.5 11694.5 11700.5 11724.5 11727.5 11731.0 11736.0 11739.0 11745.0 11749.5 11768.0 11800.0 11809.0 11857.0 11900.5 11911.5 11915.0 11917.5 11926.0 11927.5 11944.0 11963.5 11971.0 12057.0 g-lOc.tapx BIT RUN NO MERGE TOP MERGE BASE 1 9253.0 9490.0 2 9490.0 9500.0 3 9500.5 9504.0 4 9504.5 9540.0 6 9540.0 9671.0 7 9671.0 10124.0 8 10124.0 11169.0 9 11169.0 11185.0 10 11185.0 12057.5 MERGED MAIN PASS.. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Page 6 • • g-lOc.tapx Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 9249 12047 10648 5597 9249 12047 GR MWD API 11.59 634.82 41.7204 5280 9249 12023 ROP MWD FT/H 0.02 1242.98 93.4289 5269 9269 12047 First Reading For Entire File..........9249 Last Reading For Entire File...........12047 File Trailer Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File TyL~e ................LO Next File Name...........STSLIB.002 Physical EOF File Header service name... .......STSLI6.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9253.0 9465.0 ROP 9276.5 9490.0 LOG HEADER DATA DATE LOGGED: 06-]uN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory Page 7 • g-lOc.tapx TD DRILLER (FT); 9490.0 TOP LOG INTERVAL (FT): 9476.0 BOTTOM LOG INTERVAL (FT): 9490.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 44.8 MAXIMUM ANGLE: 57,2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG016 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 2.740 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9,2 MUD CHLORIDES (PPM): 32000 FLUID LOSS (C3): 6.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 141.7 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name Service Order units size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWDO10 API 4 1 68 4 2 ROP MWDO10 FT/H 4 1 68 8 3 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 9253 9490 9371.5 475 9253 9490 Page 8 ~ ~ GR MWDO10 API 11.59 277g550c.ta66.1218 151 9253 ROP MWDO10 FT/H 1 70 49.1862 137 9276.5 First Reading For Entire File..........9253 Last Reading For Entire File...........9490 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......0$/03/04 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.003 Physical EOF File Header service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LI6.002 comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9465.5 9475.5 OP 9490.5 9500.0 $ LOG HEADER DATA DATE LOGGED: 06-7UN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9500:0 TOP LOG INTERVAL (FT): 9490.0 BOTTOM LOG INTERVAL (FT): 9500.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.2 MAXIMUM ANGLE: 57.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG005 Page 9 9465 9490 ~ ~ g-lOc.tapx BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: Q,2 MUD CHLORIDES (PPM): 32000 FLUID LOSS (C3): 6.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 137.5 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Name service order units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD020 API 4 1 68 4 2 ROP MwD020 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9465.5 9500 9482.75 70 9465.5 9500 GR MWD020 API 14.84 6 34.82 109.098 21 9465.5 9475.5 ROP MWD020 FT/H 1.31 13.79 6.9785 20 9490.5 9500 First Reading For Entire File..........9465.5 Last Reading For Entire File...........9500 File Trailer Service name... .......STSL2B.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Page 10 g-lOc.tapx Maximum Physical Record..65535 File Ty e ................L0 Next Fl~e Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.... .08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT:. .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 9500.5 9504.0 LOG HEADER DATA DATE LOGGED: 07-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9504.0 TOP LOG INTERVAL (FT): 9500.0 BOTTOM LOG INTERVAL (FT): 9504.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.2 MAXIMUM ANGLE: 57.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 32000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 142.0 MUD FILTRATE AT MT: .000 .O Page 11 MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): g-lOc.tapx REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 .000 .0 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9500.5 9504 9502.25 8 9500.5 9504 ROP MWD030 FT/H 0.02 1.8 0.815 8 9500.5 9504 First Reading For Entire File..........9500.5 Last Reading For Entire File...........9504 File Trailer Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File TyL~e ................L0 Next File Name...........STSLIB.005 Physical EOF Fi le Header Service name... .......STSLI6.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.004 Page 12 • Comment Record g-lOc.tapx FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 9504.5 9540.0 LOG HEADER DATA DATE LOGGED: 07-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9540.0 TOP LOG INTERVAL (FT): 9504.0 BOTTOM LOG INTERVAL (FT): 9540.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 57.2 .MAXIMUM ANGLE: 57,7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 32000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 145.9 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Da ta Format Specification Record Data Record Type... .......... 0 Data Specification Block Type..... 0 Logging Direction ................. DOwn Page 13 • optical log depth units...........gee0c.tapx Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9504.5 9540 9522.25 72 9504.5 9540 ROP MWD040 FT/H 1.66 23.94 15.9443 72 9504.5 9540 First Reading For Entire File..........9504.5 Last Reading For Entire File...........9540 File Trailer Service name... .......STSLIB.005 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File TyL~e ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLI6.006 service sub Level Name... version Number.. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9476.0 9647.5 ROP 9540.5 9671.0 LOG HEADER DATA DATE LOGGED: O8-JUN-06 SOFTWARE Page 14 • SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: • g-lOc.tapx Insite 8.01 Memory 9671.0 9540.0 9671.0 55.5 57.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. .. ..... Datum specification Block sub-type...0 TOOL NUMBER TLG016 3.000 9468.0 Polymer 8.60 65.0 8.7 32200 5.8 .000 .0 .000 141.7 .000 .0 .000 .0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 GR MWD060 API 4 1 68 4 2 ROP MwD060 FT/H 4 1 68 8 3 Page 15 • g-lOc.tapx First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 9476 9671 9573.5 391 9476 9671 GR MWD060 API 16.55 92.1 33.0051 344 9476 .9647.5 ROP MWD060 FT/H 0.34 58.91 14.3757 262 9540.5 9671 First Reading For Entire File..........9476 Last Reading For Entire File...........9671 File Trailer Service name... .......STSLI6.006 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF File Header Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.006 comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9648.0 10100.5 ROP 9671.5 10124.0 LOG HEADER DATA DATE LOGGED: 08-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10124.0 TOP LOG INTERVAL (FT): 9671.0 BOTTOM LOG INTERVAL (FT): 10124.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.8 MAXIMUM ANGLE: 73.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER Page 16 a0c.tapx g PCG Natural gamma r TLG016 S BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: $,7 MUD CHLORIDES (PPM): 33200 FLUID LOSS (C3): 5.9 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 150.1 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD070 API 4 1 68 4 2 ROP MWD070 FT/H 4 1 68 8 3 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 9648 10124 9886 953 9648 10124 GR MWD070 API 17.21 149.15 30.8629 906 9648 10100.5 ROP MWD070 FT/H 0.04 213.37 65.1485 906 9671.5 10124 First Reading For Entire File..........9648 Last Reading For Entire File...........10124 File Trailer Service name .............STSLIB.007 Page 17 . ~ • Service Sub Level Name... 9-lOc.tapx version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.008 Physical EOF File Header service name... .......STSLIB.008 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10101.0 11145.5 ROP 10124.5 11169.0 LOG HEADER DATA DATE LOGGED: 11-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11169.0 TOP LOG INTERVAL (FT): 10124.0 BOTTOM LOG INTERVAL (FT): 11169.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 67.9 MAXIMUM ANGLE: 93.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG016 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 8.9 MUD CHLORIDES (PPM): 34000 Page 18 g-lOc.tapx FLUID LOSS (C3): 6.0 RESIST IVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 171.0 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD080 API 4 1 68 4 2 ROP MWD080 FT/H 4 1 68 8 3 First Last Name service Unit Min Max Mean Nsam Reading Reading DEPT FT 10101 11169 10635 2137 10101 11169 GR MWD080 API 18 172.78 42.3183 2090 10101 11145.5 ROP MWD080 FT/H 1.42 335.11 109.611 2090 10124.5 11169 First Reading For Entire File..........10101 Last Reading For Entire File...........11169 File Trailer Service name... .......STSLI6.008 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.009 Physical EOF File Header Service name .............STSLIB.009 Page 19 • i Service Sub Level Name.., g-lOc.tapx version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11146.0 11162.0 ROP 11169.5 11185.0 LOG HEADER DATA DATE LOGGED: 11-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11185.0 TOP LOG INTERVAL (FT): 11169.0 BOTTOM LOG INTERVAL (FT): 11185.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 86.7 MAXIMUM ANGLE: 86.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $CG Natural gamma ray TLG005 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 8.7 MUD CHLORIDES (PPM): 23000 FLUID LOSS (C3): 7.4 RESISTIVITY (OHMM) AT TEMPERATU RE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMP ERATURE: .000 175.4 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): Page 20 i • g-lOc.tapx EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type.. ..........0 Data specification Block Type.....0 Logging DireCtion .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD090 API 4 1 68 4 2 ROP MwD090 FT/H 4 1 68 8 3 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 11146 11185 11165.5 79 11146 11185 GR MWD090 API 26.33 102.93 41.273 33 11146 11162 ROP MWD090 FT/H 1.62 165.38 52.7091 32 11169.5 11185 First Reading For Entire File..........11146 Last Reading For Entire File...........11185 File Trailer Service name... .......STSLIB.009 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File TyL~e ................L0 Next File Name...........STSLIB.010 Physical EOF File Header Service name... .......STSLIB.O10 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.009 comment Record FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 10 Page 21 9-lOc.tapx DE PTH INCREMENT: .5000 FI LE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11162.5 12033.5 ROP 11185.5 12057.5 LOG HEADER DATA DATE LOGGED: 14-JUN-06 SOFTWARE SURFACE SOFTWARE VERSION: Incite DOWNHOLE SOFTWARE VERSION: 8.01 DATA TYPE (MEMORY OR REAL-TiME): Memory TD DRILLER (FT): 12057.0 TOP LOG INTERVAL (FT): 11185.0 BOTTOM LOG INTERVAL (FT): 12057.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: $7.9 MAXIMUM ANGLE: 96.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $CG Natural gamma ray TL0005 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 3.000 DRILLER'S CASING DEPTH (FT): 9468.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 65.0 MUD PH: 8.6 MUD CHLORIDES (PPM): 31600 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATU RE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMP ERATURE: .000 179.7 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Page 22 g-lOc.tapx Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 • Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD100 API 4 1 68 4 2 ROP MWD100 FT/H 4 1 68 8 3 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 11162.5 12057.5 11610 1791 11162.5 12057.5 GR MwD100 API 15.96 183.11 45.9098 1743 11162.5 12033.5 ROP MWD100 FT/H 0.06 1242.98 108.607 1745 11185.5 12057.5 First Reading For Entire File..........11162.5 Last Reading For Entire File...........12057.5 File Trailer Service name... .......STSLIB.O10 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/04 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.011 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/03/04 Origin ...................STS Tape Name. .... ........UNKNOWN continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name ..........:..LISTPE Date . ...................08/03/04 Ori9in ...................STS Reel Name. .... ........UNKNOWN continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS writing Library. Physical EOF Physical EOF scientific Technical services scientific Technical services Page 23 • g-lOc.tapx End Of LIS File Page 24