Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
207-136
Image ~'rc~j~~t 1tV~l1 ~i~t~r~r ~il~ Cc~vl~r Page xt~vzc TPtis page i~lerltifies tP~o~,e items that were not scanned during the initial production scanning phase. Tttey are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ - ~ ~ ~ Well History File Identifier Organizing (done) ~~.wo.a~ iiiumiiumiiii Ae.~~~eed~ iuiuuiAiiuuu RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ^ Diskettes, No. ^ Maps: ~reyscale Items: ` ~k ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ' /s/ Project Proofing III II'lll I I III I I III BY: Maria Date: I a /s/ Scanning Preparation ~ x 30 = ~ + -~~,~=,i- =TOTAL PAGES (Count does not include cover sheet) BY: _ Maria , Date: J ~, ~ (~ /s/ ~' ~ ~ III 1111111111111111 Production Scanning Stage ~ Page Count from Scanned File: ~`'~_ (Count does include cover heet) Page Count Matches Number in Scanning Preparation: V YES NO BY: Maria Date: ~/,~ ~~ /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III 11~1II 11111 I1 111 ReScanned 111111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked 111 II'1~111111~1111 ~' 10!6/2005 Well History File Cover Page.doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION L.f REPORT OF SUNDRY WELL OPERATIONS M zP $ ;; 2013 1. Operations Performed: A DG C ❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Perforate ❑ Re -Enter Suspended Well ❑ Alter Casing ® Pull Tubing ❑ Stimulate - Frac ❑ Waiver ® Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Stimulate - Other ❑ Time Extension Jet Pump Conversion 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic " 207 - 136 3. Address: ® Development ❑ Service 6. API Numbe. P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50.029 23371 - 00 - 00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL 025518 , MPH -19 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Milne Point Unit / Schrader Bluff 11. Present well condition summary: Total depth: measured 7620' feet Plugs:(measured) None feet true vertical 4260' feet Junk: (measured) 6720' feet Effective depth: measured 6871' feet Packer: (measured) 6501' feet true vertical 4152' feet Packer: (true vertical) 4016' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 112' 20" 112' 112' 1490 470 Surface 3778' 10 -3/4" 36' - 3814' 36' - 2928' 5210 2480 Intermediate Production 7551' 7 -5/8" 34' - 7585' 34' - 4255' 6890 4790 Liner SCANNED APR 2 2 2013 Perforation Depth: Measured Depth: None feet True Vertical Depth: None feet Tubing (size, grade, measured and true vertical depth): 4 - 1/2 ", 12.6# L - 6705' 4093' Packers and SSSV (type, measured and true vertical depth): 7 -5/8" x 4 -1/2" TNT Packer 6501' 4016' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 370 0 Subsequent to operation: 0 0 0 0 0 14. Attachments: ❑ Copies of Logs and Surveys run 15. Well Class after work: ❑ Exploratory ❑ Stratigraphic' ® Development ❑ Service ® Daily Report of Well Operations 16. Well Status after work: r ® Oil ❑ Gas ❑ WDSPL ® Well Schematic Diagram ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact: Sean McLaughlin, 564 -4387 N/A � Email: Sean.McLaughlin @bp.com Printed Nam ` Jo LEst • Title: Drilling Technologist nn Signature: ' I Phone: 564 -4091 Date: 3II 2 j /I 3 Form 10 -404 Re Dfsed S MAR 15 2015 sdkj4 VLF �/ / Submit Original Only 41/ 3 Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Datefine: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING ©21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 2/15/2013 00:00 - 01:30 1.50 MOB P PRE PJSM FOR RIG MOVE OFF OF MPI -19 - NOTIFY PAD OPERATOR - NIGHT TOOLPUSHERS, NIGHT WSLAND DOYON SUPERINTENDENT ON LOCATION - PULL OFF OF MP I -19 AND MOVE TO MP H PAD KWF FOR MP H -19 EN ROUTE FROM PBU. 01:30 - 03:00 1.50 MOB P PRE 0130 -0300: ARRIVE MPH PAD - PULL ON TO MP H -PAD - LAY MATS AND PREP TO BACK OVER WELL. - BACK OVER MPH -19 -WSL /TOOLPUSHER PRESENT. PAD OPERATOR NOTIFIED. 03:00 - 08:30 5.50 RIGU P PRE PJSM, RAISE DERRICK - - BRIDLE DOWN - SPOT RIG COMPONENTS. - RU CELLAR I. - RIG UP FLOOR. - LOAD PITS WITH 8.5 PPG 120 DEG SEAWATER. 'ACCEPT RIG AT 0600 HRS ON 02/15/2013 08:30 - 10:30 2.00 WHSUR P WHDTRE PJSM, RU CIRCULATING EQUIPMENT.. - RU TO HARD LINE TO FLOW BACK TANK - WARM LINE AND FILL TO TEST WITH DIESEL. 10:30 - 12:00 1.50 WHSUR P WHDTRE R/U KILL MANIFOLD IN CELLAR • - CIRCULATING LINE TO WELLHEAD - PRESSURE TEST KILL MANIFOLD AND HARDLINE - CONTINUE ONLOADING 8.5 PPG - 120 DEGREE SEAWATER TO PITS. - PERFORM SPCC CHECKS AROUND THE RIG. SET UP COMMS. - CONDUCT RIG EVACUATION DRILL WITH DAY CREW AAR: ALL PRESENTAT PRIMARY MUSTER AREA GOOD RESPONSE TIME FROM THIRD PARTY CREWS AS WELL. 12:00 - 13:00 1.00 WHSUR P WHDTRE PJSM, PU DSM LUBRICATOR. RU TEST HOSES. - TEST LUBRICATOR TO 250 / 3500 PSI FOR 5 CHARTED MIN. EACH. -_PULL BPV WITH TESTED LUBRICATOR SITP = 300 PSI. SICP = 325 PSI - LD LUBRICATOR PER DSM REPS. 13:00 - 13:30 0.50 KILLW P DECOMP PJSM, WELL KILL - WSL, TOOLPUSHER, RIG CREW IN ATTENDANCE. - REVIEW DDI WELL KILL SOP. DISCUSS VALVE ALIGNMENT, HAND HELD GAS DETECTOR WITH MAN AT FLOW BACK TANK. - DRILLER DISCUSSED ROLES AND RESPONSIBILITIES OF PERSONNEL. - MPU SECURITY AND PAD OPERATOR NOTIFIED OF GAS VENTING ON PAD. Printed 3/4/2013 3:21:25PM Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 13:30 - 14:00 0.50 KILLW P DECOMP LINE UP TO KILL WELL VIA WELL KILL MANIFOLD IN CELLAR. - WSL & TOOL PUSHER VERIFY VALVE ALIGNMENT 14:00 - 19:00 5.00 KILLW P DECOMP - BLEED GAS FROM IAAT 325 PSI TO 0 PSI IN 21 MINUTES, NO FLUID RETURNS. - WSL & TOOL PUSHER VERIFY VALVE ALIGNMENT FOR KILL. CIRCULATE 40 BBLS 8.5 PPG SEAWATER DOWN 2 7/8" TBG. - FLUID AT TIGER TANK - BULLHEAD 20 BBLS KWF DOWN TUBING: TUBING PRESSURE= 850 PSI, IA= 150 PSI - OPEN CHOKE AND CIRCULATE 370 BBLS 8.5 PPG SEAWATER DOWN TUBING @ 5 BPM AND 850 PSI THROUGH LOWER GLM AT 6388' MD - HEAVY OIL RETURNS AT TANK & IN RETURN LINE - CONTINUE CIRCULATION KILLATTEMPTING - TO GET CLEAN RETURNS. PUMP 359 ADDITIONAL BBLS KWF AT 5 BPM @ 1000 PSI SLOW TO 3 BPM @ 380 PSI. - CLEANER RETURNS IN FINAL 50 BBLS PUMPED - PUMPS OFF 25 PSI @ 18:42 HRS. - AFTER 18 MINUTES BOTH TBG AND IA ON A VACUUM. - CONTINUE MONITORING WELL DURING NEXT PHASES - 471 BBLS KWF LOST TO FORMATION DURING KILL 19:00 - 20:30 1.50 WHSUR P DECOMP RIG DOWN MANIFOLD - BLOW DOWN LINES - RIG DOWN CIRCULATING LINES & KILL MANIFOLD - R/U SECONDARY KILL LINE 20:30 - 22:30 2.00 WHSUR P DECOMP PJSM WITH WELL SUPPORT AND RIG CREW TO SET TWC - M/U LUBRICATOR & TEST 250 PSI LOWAND 3500 PSI LOW FOR 5 MINS EACH , CHARTED - SETTWC - LAY DOWN LUBRICATOR 22:30 - 00:00 1.50 WHSUR P DECOMP PRESSURE TEST TWC - PERFORM ROLLING TEST BELOW TWC - PUMP DOWN IA@ 5 BPM AND 200 PSI FOR 10 MINS, CHARTED (103 BBLS KWF PUMPED) - TEST TWC FROM ABOVE : 250 PSI LOW PSI FOR 5 MINS , CHARTED - 191 BBLS 8.5 PPG SEAWATER LOST TO WELL AFTER WELL KILL TOTAL LOST TO WELL IN 24 FIRS = 662 BBLS KWF Printed 3/4/2013 3:21:25PM Common Well Name: MPH-19 AFE No Event Type: VVORKOVER (WO) Start Date: 2/15/2013 End Date: X4-00X8G-E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name/No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor DO YON DRILLING INC. 00000070.32 1000 - 5' Sect: P Active datum: ORIG KELLY BUSHING ©21.34m (above Mean Sea Level) From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (m) 2/16/2013 00:00 - 01:00 1.00 WHSUR P DECOMP PRE -TOUR MEETING AND HANDOVER WITH NEW CREW - SPCC CHECKS - COMPLETE TEST FROM ABOVE OF TWC, - TEST TWC FROM ABOVE : 3500 PSI HIGH FOR 5 MINS , CHARTED PREPARE TO N/D TREE 01:00 - 02:30 1.50 WHSUR P DECOMP PJSM TO DRAIN AND N/D TREE & N/U BOP - NIPPLE DOWN FMC 11" x 2- 9/16" , 5M - ADAPTER FLANGE & 2- 9/16" TREE - FMC REP CLEAN AND INSPECT EUE 8RD HANGER THREAD - CONFIRM 9 -1/4 TURNS BY HAND - CLEAR OLD 'rR EE FROM CELLAR 02:30 - 05:00 2.50 WHSUR P DECOMP PJSM NIPPLE UP BOP STACK - N/U 13 -5/8" BOP -- 05:00 - 14:00 9.00 BOPSUR P , DECOMP PJSM, TEST THREE PREVENTER BOP AND RELATED EQUIPMENT - FUNCTION TEST ACCUMULATOR SYSTEM - TEST BOP TO 250/3500 PSI FOR 5 MINUTES EACH TEST. - USED 2 -7/8" AND 4-1/2" TEST JOINTS FOR 2 -7/8" x 5" VBR. TEST ANNULAR WITH 2 -7/8" TEST JOINT. - PERFORM ACCUMULATOR RECOVERY TEST. - - TIME LOST BUMPING UP PRESSURE DUE TO INTERMITTENT LEAK IN TWC. - AOGCC, BOB NOBLE WAIVED STATES RIGHT OF WITNESS BOP TEST - MAINTAIN CONTINUOUS HOLE FILL TO THE IA DURING TEST AT 20 BPH , 8.5 PPG SEAWATER 14:00 - 15:00 1.00 BOPSUR P DECOMP BLOW DOWN LINES. RIG DOWN TEST EQUIPMENT. SUCK FLUID OUT OF BOP. 15:00 - 16:00 1.00 PULL P DECOMP RIG UP CENTRLIFT SPOOLER SHEAVE AND SPLASH GUARD FROM RIG FLOOR TO GROUND. 16:00 - 18:00 2.00 PULL P DECOMP PICKUP WELL SUPPORT OFF -SET LUBRICATOR. - MAKE UP TO TUBING HANGER. TEST TO 250/3500 PSI FOR 5 MINUTES. - PULL TWC. PULL AND LAY DOWN LUBRICATOR. 18:00 - 18:30 0.50 PULL P DECOMP PJSM ON PULLING 2 7/8" TBG HANGER TO FLOOR. - WSL, TOOLPUSHER, FMC REP, RIG CREW IN ATTENDANCE. - DISCUSSED WELL CONTROL, CONTINUOUS HOLE FILL, DISCONNECTING ESP CABLE FROM PEN ETRATER. Printed 3/4/2013 3:21:25PM , 1 • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 18:30 - 19:30 1.00 PULL P DECOMP MU 2 -7/8" EUE LANDING JOINT WITH FOSV TO TBG HANGER. BOLDS PER FMC REP. - WSL VERIFY NO TRAPPED PRESSURE UNDER TBG HANGER. - PULL TBG HANGER OFF SEAT @ 79K INCLUDES 40K TOP DRIVE WT. - MAX PULL 80K INCLUDES TOP DRIVE WT. - PUW = 75K, SOW = 70K - PULL HANGER AND REMOVE FLAT GUARDS AND BANDS ON FIRST FULL JOINT, - CUT ESP & HEAT TRACE CABLE. - POSITION SLICK JOINT ACROSS BOPE. - LD TBG HANGER. 19:30 - 20:30 1.00 PULL P DECOMP PJSM, - CLOSE ANNULAR - ESTABLISH LOSS RATE: 19 BBLS LOST IN 20 MINS - BULLHEAD 40 BBLS KWF DOWN TUBING, 4 BPM = 700 PSI. - WSL / DRILLER VERIFY VACUUM AND NO TRAPPED PRESSURE. - Up LANDING JOINT, FOSVAND CIRC HOSE. - BLOW DOWN CEMENT LINE AND CIRC. EQUIPMENT. - OPEN ANNULAR. START FEEDING THE IA. - ESTABLISH STATIC LOSS RATE OF 59 BPH - CONTINUAL HOLE FILL 8.5 PPG SEAWATER AT —20 - 25 BPH. OA = 220 PSI 20:30 - 00:00 3.50 PULL P DECOMP PJSM TO PULL ESP / HEAT TRACE COMPLETION ASSEMBLY - POH WITH 2 -7/8" "_EUE 8RD TUBING ESP CABLE &HEAT TRACE - LAYING DOWN TUBING - ATTACH ESP CABLE AND HEAT TRACE TO SPOOLING UNIT - POOH W/ ESP COMPLETION, HEAT TRACE , LAYING DOWN TBG CONTINUAL HOLE FILL WITH 8.5 PPG SEAWATER @ —25 BPH 302 BBLS OF 8.5 PPG SEAWATER LOST IN 24 HRS 2/17/2013 00:00 - 04:00 4.00 PULL P DECOMP PRE -TOUR MEETING AND HANDOVER - SPCC CHECKS - POH WITH 2 -7/8" EUE BRD TUBING, ESP CABLE & HEAT TRACE FROM —5634' MD - LAY DOWN TUBING 04:00 - 05:30 1.50 PULL P DECOMP POOH TO 4047' MD - PIPE AND CABLE COMING OUT VERY OILY - SET SLIPS, STAB FOSV - CIRCULATE A20 BBL DEEP CLEAN PILL THROUGH LOWER GLM CURRENTLY AT —3850' MD - PUMP PILLAT 3.5 BPM AND 400 PSI - CLEAN AND CLEAR RIG FLOOR - ESTABLISH STATIC LOSS RATE OF 26 BPH Printed 3/4/2013 3:21:25PM Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 05:30 - 14:00 8.50 PULL P DECOMP RESUME POOH WITH 2 -7/8" EUE 8RD TUBING ESP CABLE AND HEAT TRACE FROM 4047' MD - REMOVE FLAT GUARDS, CLAMPS AND BANDS FROM TUBING. - WIPE OIL FROM OUTSIDE OF TUBING, ESP AND HEAT TRACE CABLES. - TUBING IS CLEAN ON THE INSIDE. A LITTLE INTERNAL CORROSION AND PITTING. - NO EXTERNAL CORROSION. - PUMP 20 BBL DEEP CLEAN PILL DOWN ANNULUS. - RECOVERED 5 PROTECTORS, 3FLAT GAURDS, & 56 LASALLE CLAMPS ON PUMP & MOTOR - RECOVERED 566- 6' FLAT GAURDS, 12- 4' FLAT GAURDS, 10- 3' FLAT GAURDS, AND 1,723 BANDS. FROM HEAT TRACE CONDUCTED KICK WHILE TRIPPING DRILL. AAR. GOOD RESPONSE FROM CREWAND _THIRD PARTY WORKERS. OA SHUT IN PRESSURE 240 PSI. OPEN OA TO FLOW BACK TANK. - BLEED OFF QUICKLY WITH VERY LITTLE FLUID. MAINTAIN OA OPEN WHILE POH. LOST 242 BBL SEAWATER TO WELL 14:00 - 17:00 3.00 PULL P DECOMP PJSM. LAY DOWN ESP PUMP AND MOTOR. - CUT CABLE. LAY DOWN PUMP AND MOTOR. 17:00 - 18:30 1.50 PULL P DECOMP PJSM. RIG DOWN ESP TOOLS. - RIG DOWN ESP TOOLS. - RIG DOWN SHEAVE AND SPLASH GUARD FROM DERRICK. - CLEAR AND CLEAN RIG FLOOR. 18:30 - 19:30 1.00 PULL P DECOMP PREPARE FOR PACKOFF CHANGEOUT - M/U PACKOFF RUNNING TOOL - THAW HARDLINE TO TIGER TANK WITH STEAM - 0/A PRESSURE GAUGE = 18 PSI 19:30 - 21:00 1.50 PULL P DECOMP MONITOR 0/A PRIOR TO PULLING PACKOFF - 0/A PRESSURE AT 30 PSI, SMALLAMOUNT OF FLUID BLED INTO BUCKET - RIG UP 0/A TO PORTABLE BLEED TANK - CALL TOWN ODE © 1945, DECISION MADE THAT IF 0/A IS STILL HOLDING PRESSURE AFTER 1 HR , TO CHANGE PACKOFF AFTER MILL & SCRAPER RUN 21:00 - 21:30 0.50 PULL P DECOMP MAKE UP WEAR RING RUNNING TOOL - SHUT IN 0/A PRESSURE= 20 PSI - P/U RUNNING TOOL AND INSTALL WEAR RING, I.D.= 9" - THAW HARDLINE TO TIGER TANK WITH HEATERS AND 'HARDLINE BLANKETS' Printed 3/4/2013 3:21:25PM . Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 21:30 - 00:00 2.50 CLEAN P DECOMP PJSM FOR MAKING UP MIL & SCRAPER BHA - PICK UP MILLAND SCRAPER ASSEMBLY (BHA #1) - 4 -3/4" JUNK MILL, 6 -1/2" DRESSING, 2X BOOT BASKETS, 7 -5/8" CASING SCRAPER BUMPER JAR, HYD OIL JAR, PUMP OUT SUB, - X/O, & 9 DRILL COLLARS - BHA #1 OAL: 347.18' STATIC LOSS RATE = 10 BPH CONTINUAL HOLE OF 8.5 PPG SEAWATER AT —20 BPH LOSSES FOR THE DAY = 417 BBLS 8.5 PPG SEAWATER 2/18/2013 00:00 - 07:30 7.50 CLEAN P DECOMP PRE -TOUR MEETINGAND HANDOVER - SPCC CHECKS -RIH W/ 4 -3/4" MILLAND 7 -5/8" SCRAPER ASSEMBLY (91-IA #1) - RIH PICK UP 4" DRILL PIPE IN SINGLES. - AT 6690' RECORD SPR. 30 SPM 150 PSI. 40 SPM 270 PSI -- PICK UP WEIGHT 116K. SLACK OFF WEIGHT - 94K - ROTATING WEIGHT 102K AT 40 RPM WITH 4K TORQUE. - TAG TOP OF LINER AT 6694' (RKB CORRECTION) 07:30 - 08:30 1.00 CLEAN P DECOMP PICKUP TOP DRIVE. - RUN IN SLOWLY WITH PUMP AT 5 BPM WITH 490 PSI. ROTATE AT 40 RPM - CONFIRM TAG AT TOP OF LINER AT 6694' - RUN IN AND TAKE WEIGHT AT 6713' WHEN NO -GO ON CLEAN -OUT BHA TAG TOP OF LINER. - ROTATE WITH NO -GO ON TOP OF LINER TO MARK TATTLETALE. - THE 4 3/4" MILL IS 17' INSIDE THE LINER AT 6711'. 08:30 - 10:30 2.00 CLEAN P DECOMP PUMP 40 BBL HIGH VIS SWEEP AT 5 BPM WITH 490 PSI. - DUMP SWEEP OVERBOARD. - MONITOR WELL PRIOR TO POH. 10:30 - 11:30 1.00 CLEAN P DECOMP PJSM POH 4" DRILL PIPE - REMOVE TOP DRIVE AND BLOW DOWN LINES. - LAY DOWN ONE JOINT OF 4" DRILL PIPE. - MONITOR WELL. - STATIC LOSSES TO WELL 10 BPH 11:30 - 12:00 0.50 CLEAN P DECOMP POH CASING SCRAPER BHA TO 5372'. - STAND BACK4" DRILL PIPE 12:00 - 12:30 0.50 CLEAN P DECOMP CREW CHANGE. INSPECT EQIPMENT, SERVICE RIG. 12:30 - 15:30 3.00 CLEAN P DECOMP POH CASING SCRAPER BHA FROM 5372' TO BHA AT 347' - STAND BACK 4" DRILL PIPE. - FLUID LOST TO WELL WHILE POH = 10 BPH Printed 3/4/2013 3:21:25PM • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21 /2013 Rig Contractor. DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 15:30 - 16:30 1.00 CLEAN P DECOMP PJSM ON LAY DOWN DRILL COLLARS, HANDLE BHA. - LAY DOWN 9 EA 4 3/4" DRILL COLLARS. - LAY DOWN MILL AND SCRAPER CLEAN OUT BHA. - INSPECT TATTLETALE ON NO-GO. CLEAR INDICATION OF CONTACT WITH THE LINER TOP. CLEAN BOOT BASKETS. NOTHING RECOVERED - NO INDICATION OF DAMAGE OR WEAR ON MILL. 16:30 - 17:30 1.00 PULL P DECOMP PREPARE FOR PACKOFF CHANGEOUT M/U RUNNING TOOL - PULL WEAR RING - MAKE UP PACKOFF, PULLING TOOL - MONITOR 0/A 17:30 - 20:00 2.50 PULL P DECOMP MONITOR 0/A PRIOR TO PULLING PACKOFF - 0/A STILL FLOWING SMALLAMOUNTS OF FLUID & GAS INTO BUCKET - CALL TOWN ODE @ 1945, DECISION MADE NOT TO CHANGE MANDREL PACKOFF AND MOVE FORWARD WITH THE REST OF THE WELL PLAN - LAY DOWN PULLING TOOL - RESET WEAR RING, I.D.= 9" 20:00 - 21:00 1.00 WHSUR P DECOMP - RESET LOCK DOWN SCREWS, AND TEST FMC 7 -5/8" MANDREL PACKOFF VOID AND SEALS TO 3800 PSI FOR 30 MINS - BEGIN TEST AT 3843 PSI. LOST 138 PSI IN FIRST 15 MINS AND 54 PSI IN 2ND 15 MINUTES. 21:00 - 00:00 3.00 EVAL P DECOMP PJSM, PU / MU 7 5/8" HES CHAMP PACKER PER HES REP. - WSL, TOOLPUSHER, HES REP. RIG CREW IN ATTENDANCE. - OD. OF HES 7 5/8" CHAMP PACKER = 6.51" - RIH ON 4" HT -38 DRILL PIPE FROM DERRICK. - RIH TO 6619" MD. CONTINUAL HOLE FILL WITH 8.5 PPG SEAWATER AT 12 BPH 389 BBLS KWF LOST FOR THE DAY 2/19/2013 00:00 - 02:00 2.00 EVAL P DECOMP PRE -TOUR MEETING AND HANDOVER - SPCC CHECKS - RIH W/ 7 5/8" HES CHAMP PACKER FROM -4000' MD CENTER OF ELEMENT. - RIH ON 4" HT -38 DRILL PIPE FROM DERRICK. - RIH TO - 6620" MD. 02:00 - 02:30 0.50 EVAL P DECOMP SET 7 -5/8" HES CHAMP PACKER -- OBTAIN PARAMETERS AT 6587' MD - PUW= 107K, SOW= 93K - WORK PACKER AT SET DEPTH OF 6613' MD - SET DOWN 5' & ROTATE 2 TURNS, PACKER , ET AT 6613' MD Printed 3/4/2013 3:21:25PM • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING ©21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 02:30 - 05:00 2.50 EVAL P DECOMP PJSM, MIT -IA, 7 5/8" L -80 29.7 # CSG BY4" DRILL PIPE ANNULUS. - CONFIRM VALVE ALLIGNMENT PRIOR TO TEST - PUMPED 36 STKS (3 BBLS) TO / 3,350 PSI FOR 30 CHARTED MINUTES. DISCUSS W/ TOWN RWO ENGINEER. - MIT -IA TEST, MEETS BP STP CRT -AK -10-45 CRITERIA., RECEIVED PERMISSION TO PROCEED FROM WTL. - BLEED OFF PRESSURE. " 0 " READING. ESTIMATE 2.5 BBLS BLED BACK - VERIFIY NO TRAPPED PRESSURE BELOW PACKER. FILLED TBG WITH KWF. RELEASED CHAMP PACKER PER HES REP. - ALLOW PACKER ELEMENTS TO RELAX - MONITOR WELL FOR 10 MIN. WITH CONTINUAL HOLE FILL. -SEE ATTACHMENTS 05:00 - 12:00 7.00 EVAL P DECOMP -POH WITH 7 -5/8" HES C HAMP PACKER POH WITH CHAMP PACKER ON 4" HT -38 DP - LAYING DOWN DRILL PIPE 1 x 1 IN PIPE SHED. - FLUID LOST TO HOLE WHILE POH 10 BPH 12:00 - 12:30 0.50 EVAL P DECOMP CREW CHANGE. SERVICE RIG AND INSPECT EQUIPMENT. 12:30 - 13:30 1.00 EVAL P DECOMP POH WITH CHAMP PACKER ON 4" HT -38 DP - LAYING DOWN DRILL PIPE 1 x 1 IN PIPE SHED. - FLUID LOST TO HOLE WHILE POH 10 BPH - LAY DOWN CHAMP PACKER.. - LAY DOWN PACKER RUNNING TOOLS. 13:30 - 14:30 1.00 EVAL P DECOMP CLEAN AND CLEAR FLOOR. - CHANGE BAILS TOP DRIVE - PICK UP WEAR RING PULLING TOOL. PULL AND LAY DOWN WEAR RING. 14:30 - 18:00 3.50 RUNCOM P RUNCMP RIG UP TUBING RUNNING TOOLS. - RIG UP TORQUE TURN EQUIPMENT. - PULL SLB I -WIRE SPOOL TO RIG FLOOR - RIG UP I -WIRE SPOOLER AND SHEAVES. 18:00 - 18:30 0.50 RUNCOM P RUNCMP PJSM WITH RIG CREW, HALLIBURTON, SCHLUMBERGER, WSLS - DISCUSS SPECIFIC HAZARDS, WORKING WITH SERVICE HANDS ON A CROWDED RIG FLOOR 18:30 - 20:30 2.00 RUNCOM P RUNCMP P/U 4 1/2" 12.6# L80 TC -11 JET PUMP, COMPLETION BHA - M/U MULE SHOD JOINT, XN WITH RHC -M PLUG, X- NIPPLE - M/U HES 7 5/8" X 4 1/2" TNT PACKER - BAKER LOCKALL CONNECTIONS BELOW PACKER - SLB INTAKE GAUGE, HES SLIDING SLEEVE, SLB DISCHARGE GAUGE 20:30 - 23:00 2.50 RUNCOM P RUNCMP M/U AND TIE IN I -WIRE TO INTAKE AND DISCHARGE GAUGES - MAKE SERVICE SPLICES AND TEST TO 5000 PSI Printed 3/4/2013 3:21:25PM Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date /Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING ©21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ( 23:00 - 00:00 1.00 RUNCOM P RUNCMP RIH WITH 4 1/2" 12.6# L -80 TC -11 JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM BHA TO 807' OA = 0 PSI 24 HOUR FLUID LOSS = 322 BBLS 8.5 SEAWATER - MAINTAIN CONTINUOUS HOLE FILL AT 12 BPH 2/20/2013 00:00 - 01:00 1.00 RUNCOM P RUNCMP PJSM, RUNNING PACKER AND I -WIRE WITH SERVICE HANDS .' - MAKE EQUIPMENT AND SPCC CHECKS - MAINTAIN CONTINUOUS HOLE FILL AT 12 BPH 01:00 - 09:30 8.50 RUNCOM P RUNCMP -14IH WITH 44 1/2" 12.6# L-80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM 807' TO 4861' 09:30 - 10:00 0.50 RUNCOM P RUNCMP - KICK WHILE TRIPPING DRILL. - GOOD RESPONSE FROM CREW. - STAB SAFETY VALVE, SIMULATE CLOSING AND SECURING WELL. - SAFETY STAND DOWN WITH CREWAND WSL. - DISCUSS INCIDENT ON DOYON 14. 10:00 - 12:00 2.00 RUNCOM P RUNCMP - RIH WITH 4 1/2" 12.6# L-80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF 1 -WIRE EVERY 1000' - RIH FROM 4861' TO 3006' LOSSES TO WELL WHILE RIH = 18 BPH 12:00 - 12:30 0.50 RUNCOM P -_ RUNCMP CREW CHANGE. SERVICE RIG, INSPECT EQUIPMENT 12:30 - 15:00 2.50 RUNCOM P RUNCMP - RIH WITH 4 1/2" 12.6# L -80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR. - TOTAL I -WIRE CLAMPS = 155 EA 2' CANNON AND 5 EA HALF CANNON - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM 3006' TO 6723' - TAG TOP OF LINER PBR AT 6694' - RUN IN AND TAG XO BUSHING ON LINER HANGER AT 6726'. - POH. LAY DOWN TWO JOINTS. - TOTAL JOINTS 4 1/2" 12.6# L -80 TC -II RUN = 153 - MAKE UP TORQUE 3850 FT /LBS. NO REJECTS - FINAL PICK UP WEIGHT 94K. SLACK OFF 85K Printed 3/4/2013 3:21:25PM • Common Well Name: MPH 19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 15:00 - 17:30 2.50 RUNCOM P RUNCMP 4 - 1 / 2 " N HANGER. - HANGER HAS 4 1/2" TC -II LIFT THREADS AND 2.84' OF BLAST RINGS INSTALLED ON PUP JT. - PASS I -WIRE THROUGH TUBING HANGER AND SECURE FROM BELOW WITH SWEDGE -LOCK. TEST SWEDGE -LOCK ON HANGER TO 5000 PSI. - LAND TUBING HANGER. MULE SHOE AT 6705'. WITH 11' INSIDE LINER. - R/D CASING EQUIPMENT - PUWT = 94K, SOWT = 85K - TOTAL CANNON CLAMPS = 155, HALF / CLAMPS =5 17:30 - 18:00 0.50 RUNCOM P RUNCMP LAND HANGER, FMC REP PRESENT - RUN IN LOCK DOWN SCREWS - L/D LANDING JOINT 18:00 - 20:00 2.00 RUNCOM P RUNCMP R/U CELLAR LINES TO CHOKE MANIFOLD IN CELLAR - TEST LINES, 250 / 3500 PSI, 5 MIN, R/D SLB I -WIRE EQUIPMENT - ESTABLISH REVERSE CIRCULATION RATES, 4 BPM = 130 PSI 20:00 - 22:30 2.50 RUNCOM P RUNCMP PJSM FOR PUMPING CORROSION INHIBITOR WITH ALL HANDS AND TRUCK DRIVERS - PUMP 100 BBLS OF 120 DEGREE 8.5 SEA WATER DOWN IA, RETURNS TO PITS - PUMP 180 BBLS OF 8.5 CORROSION INHIBITED SEAWATER DOWN IA - 3 BPM = 120 PSI, PUMPED AT LOWER RATE TO MINIMIZE LOSSES - 152 BBL LOSS WHILE REVERSE CIRCULATING - PUMP 4 BBLS DOWN TUBING TO VERIFY OPEN BEFORE DROPPING BALL AND ROD 22:30 - 00:00 1.50 WHSUR P RUNCMP MONITOR WELL UNTIL STABLE - DROP BALL AND ROD ASSY - PRESSURE UP ON TUBING TO 3200 PSI - OBSERVE PACKER SET AT GAUGE AROUND 3100 PSI - TEST 4 1/2" 12.6# L -80 TC -11 TUBING TO 3200 PSI, 30 MINUTES - 24 HOUR FLUID LOSS = 226 BBLS 8.5 SEAWATER 2/21/2013 00:00 - 01:30 1.50 WHSUR P RUNCMP PJSM, PERFORM SPCC AND EQUIPMENT CHECKS - TEST 4 1/2" 12.6# L -80 TC -11 TUBING TO 3200 PSI, 30 MIN, CHARTED BLEED TUBING BACK TO 1500 PSI - TEST IA- PACKER TO 3200 PSI, 30 MIN, CHARTED - CALL WTL WITH RESULTS, RECEIVE AUTHORIZATION TO PROCEED - BLEED OFF TUBING AND SHEAR DCK VALVE - PUMP DOWN TUBING AT 2.5 BPM = 1060 PSI, DOWN IAAT 2.5 BPM = 700 PSI TO VERIFY THAT DCK VALVE IS OPEN, GOOD Printed 3/4/2013 3:21:25PM • Common Well Name: MPH - 19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00 Rig Release: 2/21 /2013 Rig Contractor DOYON DRILLING INC. UWI: 00000070.32 00l)00149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 01:30 - 02:00 0.50 WHSUR P RUNCMP VAC OUT BOP STACK - FMC REP, DRY ROD IN TWC 02:00 - 02:30 0.50 WHSUR P RUNCMP TEST TWC FROM BELOW, 1000 PSI, 10 MIN, CHARTED, GOOD TES- ATTEMPT TEST FROM ABOVE, UNSUCCESSFUL 02:30 - 04:00 1.50 WHSUR P RUNCMP VAC OUT BOP STACK - RINSE, CLEAN AND VAI OFF TOP OF TWC - TEST TWC FROM ABO E, 250 / 3500 PSI, 5 MIN CHARTED 04:00 - 06:00 2.00 BOPSUR P RUNCMP PJSM. NIPPLE DOWN BCP. - NIPPLE DOWN BOP S SACK - VAC OUT BOP STACK AND BLOW DOWN LINES - VISUALLY INSPECT TW;. NO EVIDENCE OF REASON FOR FAILED TEST. 06:00 - 08:30 2.50 WHSUR P RUNCMP NIPPLE UP ADAPTOR SFOOL - OLEAN AND INSPECT FMC HANGER SEALS - HEAT UP, CLEAN AND I'ISPECT ADAPTER - NIPPLE UP ADAPTOR SPOOL 08:30 - 11:00 2.50 WHSUR P RUNCMP. TERMINATE I -WIRE - PASS I -WIRE THROUGH ADAPTOR SPOOL - -PORT. - TERMINATE I -WIRE AND TEST SAME. - PRESSURE TEST ADA TOR VOID TO 250 PSI FOR 5 MINUTES AND 50 0 PSI FOR 30 MINUTES. 11:00 - 14:30 3.50 WHSUR P RUNCMP PJSM. NIPPLE UP TREE. - NIPPLE UP 4- 1/16" CIW TREE - TEST TREE TO 250/5000 PSI FOR 5 MINUTES EACH. - PRESSURE HAD TO B BUMPED UP SEVERAL TIMES. NO VISIBLE SURFACE LEAKS. 14:30 - 16:30 2.00 WHSUR P RUNCMP PJSM. RIG UP LUBRICATOR - INSTALL LUBRICATORRN TREE AND PRESSURE TEST 250/3 00 PSI 5 MINUTES I EACH. - PULL TWC AND LAY DAWN. - RKi DOWN LUBRICATOR AND HANG OFF SAME. 16:30 - 22:00 5.50 WHSUR P RUNCMP PJSM. FREEZE PROTECT WITH HOT OIL PUMP. - RIG UP LITTLE RED HOT OIL PUMP TRUCK AND LINES. - TEST LINES TO 250/3500 PSI FOR 5 MINUTES EACH. - PUMP 105 BBL DIESEL AT 80 DEG DOWN IA AT 1.5 BPM, ICP = 300, FICP = 600 PSI - ALLOW DIESEL TO'U' jUBE FOR 1 HOUR - IA = 60 PSI, TUBING = 0 PSI - BLEED OFF 1 BBL, PR SSURE IS STILL STABLE AT 60 PSI, - DISCUSS OPTIONS WITH TOWN ENGINEER 22:00 - 23:30 1.50 WHSUR P RUNCMP PJSM, M/U WELL SUPPORT LUBRICATOR - TEST LUBRICATOR, 250 / 3500 PSI, 5 MIN, CHARTED - SET BPV - R/D WS LUBRICATOR Printed 3/4/2013 3:21:25PM ti Common WeII Name: MPH -19 AFE No E Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 0ox8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud DateTme: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UW: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT (m Depth ) Phase Description of Operations 23:30 - 00:00 0.50 (hr) WHSUR P RUNCMP U S E HOT OIL PUMP TO TEST BPV FRO BELOW - 1000 PSI, 10 MIN, CHARTED - RWN CAR LINES - RELEA DO SE RIG ELL AT 24:00 HO i t I I 3:21:25PM Printed 3/4/2013 Tree: 4 1/16" 5M MPU H -19/1 ( Orig. DF elev. = 70.2' (Doyon 14) Wellhead: 11" 5M FMC Gen 5 Ri "2 Ba Orig. GL elev.= 34.1' (Doyon 14) w/ 4 1/16" FMC Tbg Hgr , 4.5" TC -II e Orig. DF elev.= 70' (Doyon 14) T &B lift threads, 4.5" CIW 'H' Profile 115' f ,' ,' '.0* r,:,, KOP @ 720' Max. hole angle = 70° - 87° from 3218' to 7239' Camco 4 1/2" x 1" 2471' L -1 Max hole angle =71 ° -95° KBG -2 Gas lift mandrel from 6859' to 10,780' I -Wire 10 3/4 ", 45.5 #, L -80 Btc. 3814' A k 4 1/2" 12.6 #, L -80, TC -ll production tubing (drift ID = 3.833 ", cap. = 0.0152 bpf) 7 5/8" 29.7 #, L -80, BTC production casing (drift ID = 6.75 ", cap. = 0.0383 bpf) (cap with Tbg inside = 0.0262 bpf) I iqp I ; I I 6 1 I I " f I SLB NDPG - C Discharge Gauge 1 6411' 3.958" ID I f HES 4 1/2" XD Duro Sleeve 6423' 3.813 Packing Bore ID SLB NDPG -C Intake Gauge 6433' 3.958" ID z HES 7 5/8" x 4 1/2" TNT Packer 1 6501 ' I � + HES 4 1/2" X Nipple 1 6582` I 3.813 Packing Bore ID HES 4 1/2" XN Nipple I 6655' 3.813 Packing Bore ID / 3.725" No - Go ID Baker Production Liner Hanger Assembly rr 5.5" x 7.63" - "HR" ZXP Liner Top Pkr. `'. WLEG (bottom 11' inside Lnr Tie Back) 1 6705` 5.5" - "RS" Packoff Seal Nipple - 6701' 7.63" x 5.5" - Flex -Lock Liner Hanger - 6720' !1 !l !I 4.5" shoe @ 10737' Milled csg. window from 6871' - 6882' MI MI El MI Whipstock set in Mother Bore Top - 6870' 4.5" x 6.38" x TAM Swell Pkrs. Bottom - 6884' 7708' 8128' 9457' 10099' 4.5" 12.6# L-80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193' - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972' 7" casing shoe 7584' DATE REV. BY COMMENTS MILNE POINT UNIT 12/19/07 REH Drill and Complete w /ESP by Doyon 14 WELL H -19 12/19/07 REH ESP Changeout by Nabors 3S API NO: 50 -029- 233710000 2/21/13 Hulme Convert to Jet Pump - Doyon 16 BP EXPLORATION (AK) • . bp BP Exploration (Alaska) Inc. _. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 5tatfiNED FEB 2 December 30, 2011 Mr. Tom Maunder _ C 3 6 Alaska Oil and Gas Conservation Commission 7 333 West 7 Avenue po4.4.1, i q Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPH -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPH -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, r Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10-404) MPH -Pad 10/9/2011 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal MPH -01 1900860 50029220610000 Dust Cover NA NA NA 6.8 9/4/2011 MPH -02 1900870 50029220620000 Sealed Conductor NA NA NA NA NA MPH -03 1900880 50029220630000 Sealed Conductor NA NA NA NA NA MPH-04 1900890 50029220640000 Sealed Conductor NA NA NA NA NA MPH -05 1950980 50029225720000 1.3 NA 1.3 NA 11.9 8/17/2011 MPH -06 1951150 50029225800000 0.2 NA 0.2 NA 5.1 10/9/2011 MPH -07A 2020240 50029225970100 6 NA 6 NA 59.5 10/31/2009 MPH -08B 2010470 50029228080200 1.2 NA 1.2 NA 17.0 9/4/2011 MPH -09 1971650 50029228040000 1.8 NA 1.8 NA 17.0 8/17/2011 MPH -10 1971490 50029227950000 1.2 NA 1.2 NA 11.9 10/31/2009 MPH -11 1971630 50029228020000 0.5 NA 0.5 NA 3.4 9/4/2011 MPH -12 1971700 50029228070000 0.5 NA 0.5 NA 3.4 9/4/2011 MPH -13A 2021670 50029228180100 0.8 NA 0.8 NA 8.5 8/17/2011 MPH -15 2051590 50029232840000 0.5 NA 0.5 NA 5.1 8/17/2011 MPH -16 2041900 50029232270000 1.8 NA 1.8 NA 17.0 8/17/2011 MPH -17 2070660 50029233580000 1.3 NA 1.3 NA 13.6 8/17/2011 MPH -18 2041740 50029232240000 18.6 NA Need top job - ' -, 1 MPH -19 2071360 50029233710000 0.1 NA 0.1 NA 2.6 9/4/2011 M ,_ ,_ v~ \.< rt ,. ~.' ~:`;~ t -~~ ~~ P4~~,' t is ~ a say , MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~~~ ~4 STATE OF ALASKA APR KA OIL AND GAS CONSERVATION COMMISS~ ~R~RT OF SUNDRY WELL OPERATIONS 1. Operations ~~ ^ Plug Perforations ^ Stimulate ^ Other Q ESP Performed: Alter Casing Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ ACID JOB Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter uspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: Permit to Drill Number: Name: Development 0 Exploratory ^ 207-1360 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ API Number: Anchorage, AK 99519-6612 50-029-23371-00-00 8. Property Designation (Lease Number) : 9. Well Name and Number: ~ ADLO-025518 ~ MPH-19 10. Field/Pool(s): MILNE POI NT FIELD / SCHRADER BLFF OIL POOL 11. Present Well Condition Summary: Total Depth measured 7620 feet Plugs (measured) NONE feet true vertical 4260.48 feet Junk (measured) 6720' feet Effective Depth measured 6871 feet Packer (measured) 6720' true vertical 4151.71 feet (true vertical) 4098' Casing Length Size MD TVD Burst Collapse Structural Conductor 112 20" 91.1# H-40 SURFACE - 112 SURFACE - 112 1490 470 Surface 3778 10-3/4" 45.5% L-80 SURFACE - 3814 SURFACE - 2928 5210 2480 Intermediate Production 7551 7-5/8" 29# L-80 SURFACE - 7585 SURFACE - 4255 6890 4790 Liner Liner Perforation depth: Measured depth: NONE - _ _ _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 2-7/8" 6.5# L-80 SURFACE - 6603' SURFACE - 4055' Packers and SSSV (type, measured and true vertical depth) 7-5/8"X5-1/2" HR ZXP 6720' 4098' 12. Stimulation or cement squeeze summary: Intervals treated (measured): r,,~ , Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 108 53 146 206 Subsequent to operation: 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature ~ Phone 564-4944 Date 4/6/2010 rvi i i i i v-•«vY r~cvya~cu r icvva R60MS APR 0 9 ZO~i ~`~` " 'y"'~' •,"'r Y' ~ • 1~5`/~'/~ `- ' • • MPH-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 3/29/2010 T/I/0=175/130/220 ESP acid treatment. Pump 5 bbls 60/40 meth followed by 10 I bbls 10% DAD Acid and 3 bbls 60/40 meth. down Tbg. Displace acid w/ 32 bbls of .crude down Tbg. Pressure brake @ 25 bbls of crude away (see log). FWHP=0/130/220. Swab, Wing, Choke closed. Ssv, Mst., I, O open. NOVP 3/30/2010 T/I/0=200/80/220 Freeze Protect Pumped 15 bbls diesel down Tbg & 2 bbls ' .60/40, 3 bbls diesel, 2 bbls 60/40 down FL. DSO notified swab wing ssv shut, ~,/ master is oa open. FW HP's=100/80/220 _,___..e_. ____.__ ______.. ~.__ ________.~_.__ __ __~.~._______. 3/30/2010... T/I/0=100/80/220 Flush acid into perfs. Pump 90 bbls crude followed by 15 bbls '.diesel down Tbg. FWHP=0/100/220. Swab, Wing, Ssv closed. Mst., 1, O open. NOVP FLUIDS PUMPED BBLS 10 10% DAD ACID 33 DIESEL 12 60/40 METH 55 TOTAL - ~ ~ Tree: 2 9/16" - 5M MP U H -~ 9 Orig. DF elev.'70.2' (Doyon 14) wellhead: i1" 5M FMG aen 5 Orig. GL elev.= 34.1 ` (Doyon 14) w/ 2 7/8" FMC Tubing Hanger ,EUE Orig. DF elev.= 70' (Doyon 14) lift threads, 2.5" CIW H BPV profile 20" 91.1 ppf, H-40, cond. 115` KOP @ 720' Camco KBMM GLM 162' " " 2-7/8 x 1 Max. hole angle = 70° - 87° from 3218' to 7239' L-1 Max hole angle=71°-95° from 6859` to 10,780' 10 3/4", 45.5#, L-80 Btc. 3814' Camco KBMM GLM 6388' " " 2-7/8 x 1 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg.. 2-7/8" XN nipple 6535' " (drift ID = 2.347") 2.250 ID Centrilift Pump 6547' SXD / 142P23 7 5/8" 29.7#, L-80, Btrc. production casing :' Gas Separator 6664' ( drift ID = 6.75", cap. = 0.0383 bpf) GRSFTXARH6 Tandem Seal Sections 6569' GS63DBFERHLSS/CVH6PFSA Note: Flatgaurd in hole depth unknown 7' x 1 1/2' see diagram in well file. Baker Production Liner Hanger Assembly 5.5"x 7.63"- "HR" ZXP Liner Top Pkr. 5.5"- "RS" Packoff Seal Nipple - 6701' 7.63" x 5.5"- Flex-Lock Liner Hanger - 6720' Milled csg. window from 6871' - 6882' Whipstock set in Mother Bore Top - 6870' Bottom - 6884' DATE REV. BY COMMENTS 12/19/07 REH Drill and Complete w/ESP by Doyon 14 12/19/07 REH ESP Changeout by Nabors 3S Motor- KMH/190hp 6583' 2415 volt / 48 amp Pumpmate XT-0 Sensor 6600` w/ Centralizer 4.5" shoe Ca? 10737' 4.5" x 8.38" x TAM Swell Pkrs. 7708' 8128' 9457' 10099' 4.5" 12.6# L-80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193` - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972' I 7" casing shoe 7584' MILNE POINT UNIT WELL H-19 API NO: 50-029-233710000 BP EXPLORATION DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071360 Well Name/No. MILNE PT UNIT SB H-19 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23371-00-00 MD 7620 TVD 4260 Completion Date 12/19/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: DIR, GR, RES, GYRO, NE W, DEN, GeoTap, IFR/CASANDRA, US1T, Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Tye Med/Frmt Number Name Scale Media No o g Cement Evaluation 5 Col 1 ~ *'ED C Lis 15885 Gamma Ray Rpt LIS Verification ''ED C Lis 16058 ~duction/Resistivity Log Production ~'ED C Pds 16357~'Production __ ____ _ . Well Cores/Samples Information: Name ADDITIONAL INFORM TION Well Cored? Y MV Chips Received? Yy-P}~ Analysis 'Y-HV. Received? 5 Col (data taken from Logs Portion of Master Well Data Maint Interval OH Start Stop CH Received Comments 0 6960 Case 1/22/2008 USIT, CCL, GR 10-Dec- 2007 95 6963 Case 1/22/2008 LIS Veri, GR, CCL Tens 224 7543 Open 3/24/2008 LIS Veri, RPM, FET, RPX, RPD, RPS, GR, ROP, FCNT, NPHI, NCNT, DRHO, PEF, RHOB 224 .7543 Open 3/24!2008 LIS Veri, RPM, FET, RPX, RPD, RPS, GR, ROP, FCNT, NPHI, NCNT, DRHO, PEF, RHOB 6500 10508 Open 5/28/2008 PPL, MPL, Pres, GR, CCL, Temp, ILS, Spin 11-Mar- 2008 6500 10508 Open 5/28/2008 PPL, MPL, Pres, GR, CCL, Temp, ILS, Spin 11-Mar- 2008 Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? /~%~' N Formation Tops V' N Directional DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071360 Well Name/No. MILNE PT UNIT SB H-19 Operator BP EXPLORATION (ALASKA) INC MD 7620 TVD 4260 Completion Date 12/19/2007 Completion Status 1-OIL Current Status 1-OIL _____ __ Comments: ' -- - - Compliance Reviewed By: _ __ ___. __ API No. 50-029-23371-00-00 UIC N - - Date: - ~ _~ WELL LOG TRANSMITTAL T®: State of Alaska November 5, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPH-19+L1 AK-MW-5355566 MPH-19+L1: 2" x 5" MD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23371-00,60 2" x 5" TVD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23371-00,60 Digital Log Images: 1 CD Rom 50-029-23371-00,60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 907-273-3536 ~D~`~3Co /~- 3a~ Date: i Signed: - 2v'~-!3~ t ~3°~ LLB r.0 '"~.. • ~E~~ L 1°~.4~Il~fVl/T1",4L ~~, ~~ ~, ProActive Diagnostic Services, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hale/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP E~loration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 E. Benson Bhrd. Anchorage, Alaska 99508 and ProActive Diagnostic. Services, Inc. Attn: Robert A. Richey 130 West International Airport Road ~--, ,~-~.~ Suite C Anchorage, AK 99518 ~~, ~ ~;~ Fax (907] 245952 ~ v. 1) Production Profile 11-Mar`OS MP H-19 1 Color Log/ EDE 50-029-23371-00 2) Signed Print Name Date ~ _ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. (NTERNATiONAI AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: ::wS~~~~]~5o•y~']6~~{.~i`75era3®e'+f~a3:i.;C~y§5'? WEBSITE 'IV'~UF;~J.?Te~flm'1a'~~.~',a'Sca9 C:\Documents and Seltings\Oamer\Desktop\Transmit BP.doc STATE OF ALASKA ~~~~~~ ~-~ ~:. I V C ALAS IL AND GAS CONSERVATION COMM N APR 0 2 200$ REPOOF SUNDRY WELL OPERA IONS 1. Operations Performed: ~1nCh{3fag@ ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown Change Out ESP ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 207-136 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029.23371-00-00 7. KB Elevation (ft): 70, ~ 9. Well Name and Number: MPH-19 ~' 8. Property Designation: 10. Field /Pool(s): m ADL 025518 ' Milne Point Unit / Schrader Bluff 11. Present well condition summary Total depth: measured 7620 f feet true vertical 4260 ' feet Plugs (measured) None Effective depth: measured 6871 - feet Junk (measured) 6720' true vertical 4152 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 112' 20" 112' 112' 1490 470 Surface 3778' 10-3/4" 3814' 2928' 5210 2480 Intermediate Production 7551' 7-5/8" 7585' 4255' 6890 4790 Liner Perforation Depth MD (ft): None Perforation Depth TVD (ft): None 2-7/8", 6.5# L-80 6603' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7-5/8" x 5-1/2" HR ZXP 6720' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: 0 0 0 420 315 Subsequent to operation: 0 0 0 300 295 14. Attachments: [] Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N!A if C.O. Exempt: Contact Paul Hanson, 564-4195 N/A Printed Name Sondra Stewman Title Drilling Technologist Prepared By Name/Number: Si ature - Phone 564-5667 DateC~-C7l ~; Sondra Stewman 564-4750 Form 10-404 Revised 04/2006 y~ Submit Original Only ~RIGINA ~(~ ;.laskn Q~1 & Gas Cons. C 'ssiort Tree: 2 9/16" - 5M MP U H -191._. I Orig. DF elev. = 70.2' (Doyon 14) ` Wellhead: 11" SM FMC Gen 5 (Doyon 14) Orig. GL elev.= 34.1 w/ 2 7/8" FMC Tubing Hanger ,EUE Orig. DF elev.= 70' (Doyon 14) lift threads, 2.5" CIW H BPV profile 20" 91.1 ppf, H-40, cond. 115' KOP ~ 720' Camco KBMM GLM 162' 2-7/8" x 1" Max. hole angle = 70° - 87° from 3218' to 7239' L-1 Max hole angle=71 °-95° from 6859` to 10,780' 10 3/4", 45.5#, L-80 Btc. 3814' Camco KBMM GLM 6388' 2-7/8" x 1" f L-80 d EUE tb 2 7/8" 6 5 8 2-7/8" XN nipple 6535' , , g.. . pp r 2.250" ID (drift ID = 2.347") Centrilift Pump 6547' SXD / 142P23 7 5/8" 29.7#, L-80, Btrc. production casing : - Gas Separator 6664' ( drift ID = 6.75", cap. = 0.0383 bpf) GRSFTXARH6 Tandem Seal Sections 6569` GS63DBFERHLSS/CVH6PFSA Motor- KMH/190hp 6583' 2415 volt / 48 amp Note: Flatgaurd in hole depth unknown T x 1 1/2" see diagram in well fle. Pumpmate XT-0 Sensor 6600' w/ Centralizer Baker Producfion Liner Hanger Assembly 5.5"x 7.63"- "HR" ZXP Liner Top Pkr. 5.5"- "RS" Packoff Seal Nipple - 6701' 7.63" x 5.5"- Flex-Lock Liner Hanger - 6720' Milled csg. window from 6871' - 6882' Whipstock set in Mother Bore Top - 6870' Bottom - 6884' 4.5" shoe @ 10737' 4.5" x 6.38" x TAM Swell Pkrs. 7708' 8128' 9457` 10099' d,5°~ 12.6# L-80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193` - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972' 7" casing shoe 7584' DATE REV. BY COMMENTS MILNE POINT UNIT 12/19/07 REH Drill and Complete w/ESP by Doyon 14 WELL H-19~ 12/19/07 REH ESP Changeout by Nabors 3S API NO: 50-029-23371 BP EXPLORATION BP AMERICA Page 1 of 2 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 2/28/2008 End: 3/3/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/3/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 2/27/2008 18:00 - 00:00 6.00 RIGD P Rig released from MPC-24 ~ 18:00 hours. Prep for rig move to MPH-19. Scope and lay down derrick, pick up herculite berms. 2/28/2008 00:00 - 02:30 2.50 RIGD P PRE Rig down and prep shop and camp formove. 02:30 - 04:30 2.00 MOB P PRE Rig carrier an modules depart MPC Pad for move to MPH Pad. 2 Hrs enroute to new location. 04:30 - 12:30 8.00 RIGU P PRE Arrive on MPH pad. Spot carrier on well 19. Lay herculite and spill berms. Position pit and pipe shed modules. Hook up all lines. 12:30 - 14:00 1.50 RIGU P PRE Raise and scope Derrick. Continue to hook up rig components. Re-install elevator to pits. 14:00 - 21:00 7.00 KILL P DECOMP Rig Accepted ~ 14:00. Bob Noble w/ AOGCC waived state's i BOPE test. Rig up tree for circulation kill. RU hardline to Tiger tank. Pressure test hardline, tree to 2500 psi. Test hardline downstream of choke (to Tiger Tank) to 500 psi. 21:00 - 22:00 1.00 KILL P DECOMP PUMU lubricator, tested with diesel to 500 psi. Pull BPV, and lay down lubricator. 22:00 - 00:00 2.00 KILL P DECOMP Open well, SITP 370 psi, bleed to 40 psi start pumping at 36PM ~ 280 psi. Pumped 45 bbls of 140 deg. seawater down the tubing with no returns. close choke and bullhead 65 bbls into formation. 2/29/2008 00:00 - 02:00 2.00 KILL P DECOMP Pumped 100 bbls the long way with no returns, lines to tiger tank iceing up. Bullhead 300 bbls seawater down IA at 46PM ~ 130 psi. Tubing and IA on Vacuum. 02:00 - 06:00 4.00 KILL P DECOMP Set TWC in'ect 100 Bbls down IA to test TWC, 3 BPM, 150 psi (pump pressure). Attempt to test from above. Slight pressure loss. Call for WS tech. Pull TWC w/ Lubricator, re-dress TWC. Run TWC and test from above to 3500 psi for 20 minutes. 06:00 - 09:00 3.00 WHSUR P DECOMP 530 Bbls lost during well kill. Blow down lines. ND Tree. Inspect tubing hanger top threads - OK. 8 turns to MU 2 7/8" 8 rd EUE. 09:00 - 15:30 6.50 WHSUR P DECOMP NU DSA. PU BOPE. Ambient temperature ~ -41 deg F. MU same. MU choke and kill lines. Hook up accumulator hoses. 15:30 - 00:00 8.50 WHSUR P DECOMP BOPE test to 250 psi / 3500 psi. Test annuular to 3500 psi. Break in new VBR's with 2 7/8" - 3 1/2" - 4 1/2" test joints. BOPE test w/ 2 7/8" and 4 1/2" test joints. States right to witness ROPE test waived by Bob Noble. 3/1/2008 00:00 - 03:00 3.00 WHSUR P DECOMP HCR kill valve, outer spacer spool valve, tested after servicing. 3-1/2" dart valve failed. Tool service XO (4-1/2 IBT-MOD pin / 3-1/2 IF box) tested. Gravity fill well -30 BPH, ambient temperature -50 deg F. 03:00 - 04:00 1.00 WHSUR P DECOMP Blow down lines 04:00 - 06:00 2.00 WHSUR P DECOMP PU/MU Opso-Lopso and lubricator and tested 500 psi with diesel, pull TWC, LD lubricator and Opso-Lopso. Tbg and IA on vacuum. Secure well. 06:00 - 07:30 1.50 PULL P DECOMP Break out LDS. Line up w/ SW down kill line. Pump 3 Bbls SW on top of hanger. Pull Tbg hanger up into stack w/ 50K, fluid dropped out of sight. Pump 30 Bbl SW down IA. Pump 45 Bbl SW down Tbg. Tba and lA on vaccum. 07;30 - 09:00 1.50 PULL P DECOMP BOLD tubing hanger and pup joint. Pull tubing and run cable over ESP cable shieve. BP AMERICA Page 2 of 2 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 2/28/2008 End: 3/3/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/3/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task.. Code NPT `Phase' Description of Operations 3/1/2008 09:00 - 17:00 8.00 PULL P DECOMP POH laying down 2 7/8" tubing (210 jts), 1 - 2 7/8" x 1" GLM, 1 - X nip, 1 - AVA sleeve. rontinco ~s hole fill (no returns), ~ 30 ~! 17:00 - 17:30 0.50 PULL P DECOMP All crew review on "NU BOPE", with RLG leadership coach. 17:30 - 19:30 2.00 PULL P DECOMP Continue POH and laying down 2-7/8" tubing from -670 ft to centrilift motor- pump assembly. Lost (1) flat guard in well. Recovered (113) LaSalle clamps, (5) protectolizers, and (2) flat guards. 19:30 - 22:00 2.50 PULL P DECOMP BO/LD centrilift ESP assembly. 22:00 - 00:00 2.00 PULL P DECOMP R/D ESP cable and trunk, clean and clear rig floor. Load out centrilift ESP pump and motor assembly. 3/2/2008 00:00 - 06:00 6.00 BUNCO RUNCMP Put 4-1/2" tbg in shed, rabbit and SLM. PU 4-1/2" tubing handling tools to rig floor and RU to run tubing. PL TD -gin gPH into well with no returns. Remove thread protectors and clean. (Used work string w/ rust etc) 06:00 - 15:00 9.00 BUNCO RUNCMP Crew change. PUMU 4 1/2" WLEG / ouo it, XN nip, pup jt. PUMU 4 1/2" 12.6#, L-80 workstring 1 x 1 from pipeshed. 93 joints of IBT-M, 1 XO pup from IBT-M to NSCT, 78 joints of NSCT. 171 full joints, 2 space out pups. 15:00 - 16:00 1.00 WHSUR P TUBHGR PUMU landing joint w/ TIW valve. MU tubing hanger. MU to 4 1/2" workstring. PU wt of 73K, SOW of 40 K. RIH and land tubing hanger. 16:00 - 17:00 1.00 WHSUR P WHDTRE Drv rod TWC Unable to test TWC from below die to low 13HP Test to 3500 si from above. LDS leaking. Re-tighten LDS. Test to 3500 psi from above and chart for 10 minutes._ 17:00 - 23:00 6.00 WHSUR P WHDTRE ND ROPE, spacer spool and DSA flange. Change out HCR Kill valve. Lay over BOP stack on to cradle. 23:00 - 00:00 1.00 WHSUR P WHDTRE Spot tubing head adaptor and tree into cellar.To maintain a safe distance from pad flow lines with the BOP on the cradle, the cellar doors could not be closed completely. (ambient temperature -30 deg F.) 3/3/2008 00:00 - 04:30 4.50 WHSUR P WHDTRE Heat up and NU tubing head adaptor flang and 4" tree. FMC test hanger void to 5,000 psi for 20 minutes. Install blind flange on companion valve. Test tree and valves to 5,000 psi no visible leaks. 04:30 - 06:00 1.50 WHSUR P WHDTRE RU lubricator, pull TWC. Run BPV. Normal up tree and cellar. rnncea: aiurzwo i:a i:i i rm BP AMERICA 'Page 1.of 3 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 3S Date From - To Hours Task 'Code NPT 3/16/2008 10:00 - 14:00 4.00 RIGD P 14:00 - 14:30 0.50 MOB P 14:30 - 16:30 2.00 MOB P 16:30 - 19:00 2.501 RIGU P 19:00 - 20:30 1.501 RIGU P 20:30 - 22:30 2.001 RIGU P 22:30 - 00:00 1.501 RIGU P 3/17/2008 00:00 - 00:30 0.50 RIGU P 00:30 - 01:30 1.00 RIGU P 01:30 - 05:00 3.501 KILL ~ P 05:00 - 06:00 1.00 KILL P 06:00 - 07:00 1.00 KILL P 07:00 - 07:30 0.501 KILL P Spud Date: 11 /29/2007 Start: 3/15/2008 End: I Rig Release: 3/20/2008 Rig Number: Phase Description of Operations PRE Begin rig down process off of MPG-15. Scope the upper section of the Derrick down and lay down the Derrick. RD the Pits and Pipe Shed Modules and back out the Pipe Shed. PRE PJSM with truck drivers, truck pusher and crew. PRE Notify Milne Point of move and begin down Tract 14 road with the Pipe Shed. Back out the Pits Module from the Carrier. Notify Pad Operator and back the Carrier off well slot MPG-15 with the WSL and Pad Operator present. Mobilize the Pits and Carrier to MPH-Pad. PRE Line up Carrier over MPH-19 with the WSL and Pad Operator present. Pull Carrier Toward. Lay mats around MPH-19. Unroll and lay herculite for Carrier. PRE Back Carrier over MPH-19 with WSL and Pad Operator present. Jack and level rig. PRE Lay herculite, spot and level pits and pipeshed. Pull eclectrical lines between modules and connect. Install new descending device on derrick. Berm up herculite with Handy Berm Kit. PRE Inspect derrick and raise derrick off of Carrier. Scope up upper derrick section and insure locking dogs are set. PRE Secure derrick and guy lines. PRE R/U rig floor, hook up lines and put steam around rig. Line up pits to take on fluid. DECOMP R/U secondary annulus valve on IA, hook up lines to well. R/U hard line to Tiger Tank. Test mud lines to 3,500 psi and Tiger Tank lines to 500 psi. ** Rig Accented at 01:00 hours on 3/17/2008 ** DECOMP R/U lubricator and test to 500 psi. Well tech pulled Cameron 4" BPV. 500 psi on tubing, 460 psi on IA and 200 psi on OA. DECOMP Pre-tour checks and service the Rig. Double check valve alignment and lines prior to killing the well. DECOMP Open the well to a closed choke and observe pressures on the well: Tubing = 450 psi and IA = 460 psi. Bleed the pressure off the IA to 0 psi to the Tiger Tank. The Tubing bled down to 415 psi. Bleed the Tubing pressure down to 0 psi to the Tiger 07:30 - 10:30 3.00 KILL P DECOMP Bullhead down the IA with heated seawater. Work the rate up to 4 bpm. The IA pressure while bullheading went from 130 psi down to 0 psi and then back up to 40 psi by the end of the bullhead. The Tubing pressure started at 260 psi and finished at 170 psi by the end of the bullhead. Pumped a total of 310 bbls down the IA. Shut down and the IA is on a vac~~m. The Tubing bled down to 0 psi. Swap over to the Tubing and bullhead 205 bbls of seawater down the Tubing at a rate of 4 bpm. The Tubing pressure went from 370 psi down to 210 by the end of the bullhead and the IA pressure went from 0 to 200 psi by the end of the bullhead. 10:30 - 12:00 1.50 KILL P DECOMP Monitor the well for 30 minutes. The Tubing is on a vacuum and the IA showing about 150 psi. Bleed the IA pressure off to the Tiger Tank. The IA pressure is showing 0 psi but blowing through the needle valve. Monitor the well another 30 minutes and the Tubing is still on a vacuum and the IA is blowing. Confer with Anchorage Engineering and decision made to bullhead another IA volume (175 bbls) down the IA and monitor rnntea: ~iuizwa i:orcorm ~~ BP AMERICA Page 2 of,3 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 3/15/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/20/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours .Task Code NPT Phase " Description of Operations 3/17/2008 10:30 - 12:00 1.50 KILL P DECOMP the well. 12:00 - 14:00 2.00 KILL P DECOMP Line up down the IA and bullhead 175 bbls of heated seawater at a rate of 4 bpm / 130 psi pump pressure. Shut in the well and monitor. The IA is on a vacuum. The Tubing is static. 14:00 - 14:30 0.50 WHSUR P 14:30 - 16:00 1.50 WHSUR P 16:00 - 16:30 I 0.501 WHSUR ~ P 16:30 - 18:00 I 1.501 WHSUR I P 18:00 - 19:00 I 1.001 BOPSUF-P 19:00 - 20:00 1.00 WHSUR P 20:00 - 22:30 2.50 BOPSU P 22:30 - 23:00 0.50 BOPSU P 23:00 - 00:00 1.00 BOPSU P 13/18/2008 100:00 - 05:30 5.501 BOPSUF~ P 05:30 - 06:30 1.00 BOPSU P 06:30 - 08:00 1.50 WHSUR P 08:00 - 09:00 1.00 WHSUR P 09:00 - 10:00 1.001 WHSUR P 10:00 - 11:00 1.001 PULL P 11.:00 - 12:00 I 1.001 PULL I P DECOMP, T- ar nd s NG with FMC rem DECOMP Pressure test the TWC from above to 3.500nsi_Lor 10 charted mins - OK. Attempt to test from below by injecting at 1 bpm / 10 psi for 30 charted mins - OK. DECOMP Secure the well and have the whole crew come to the Meeting Room for a photo session at Nabors request. Take individual crew member photos as well as a group photo. DECOMP ND the 4-1/16" Tree and Adapter Flange. Check the 4-1/2" NSCT Hanger threads with FMC rep - OK. 5-1/2 turns to the left. DECOMP N/U DSA, secure cradle, lift BOP stack from cradle. Inspect and set BOP stack on DSA. DECOMP Remove the 4-1/16" Tree from the cellar area. DECOMP N/U BOP stack, install koomey lines, choke hose, kill hose, turnbuckles and riser. DECOMP Function test BOPE. All components operating correctly. DECOMP R/U 2-7/8" and 4-1/2 Test assemblies. Fill BOP stack and warm up hydril, fill choke manifold. DECOMP Test BOPE to 250 psi low pressure and 3,500 psi high pressure. Each test was held for 5 minutes on chart. Tested choke valves, manual kill, manual choke line valve, HCR kill, HCR choke line valve, floor valves, Blind Rams, VBR's and Annular with 2-7/8" test joint and 4-1/2" test joint. No failures. Perform Koomey drawdown test. " AOGCC witness of BOP test was waived by Lou Gramaldi. DECOMP R/D test assemblies and blowdown choke and kill lines. Drain the Stack. DECOMP PU Opso Lopso from the Pipe Shed and change out XO's to screw into 4-1/2" NSCT threads. Screw into the Hanger threads with 8 turns. PU Lubricator and Polished Rod and MU to the Opso Lopso. Pressure test to 500 psi with diesel. DECOMP Pull 4" Tvoe "H" TWC with Well ~~nrt Terhs. Thp Tiihinn is on a vacuum. DECOMP Break off and lay down Polished Rod and Lubricator. Change out XO's on the Opso Lopso and lay down the Opso Lopso. DECOMP PU Landing Joint with 4-1/2" NSCT XO on bottom for the Hanger. MU TIW Valve on top of the Landing Joint. BOLDS with FMC rep. Check the IA pressure =vacuum. Pump some seawater on top of Hanger. Pull on the Hanger and came free at 68K. Observe fluid on top of Hanger go down the Tubing. Pull the Hanger to the Floor with a PUW = 65K. DECOMP R/U and pump 100 bbls down tubing at 4 bpm with 50 psi. No 12:00 - 21:00 9.00 PULL P DECOMP POOH laying down 4-1/2" NSCT and 4-1/2" IBT tubing workstring. Laid down a total of 171 joints. 21:00 - 22:00 1.00 PULL P DECOMP R/D 4-1/2" handling equipment. Clear and clean rig floor. Clear 4-1/2" tubing from pipeshed. 22:00 - 23:00 1.00 BUNCO RUNCMP R/U 2-7/8 handling equipment, load 2-7/8" jewelry and ESP Pnntetl::i/27PZ0()H 1:51:'LS F'M _`BP AMERICA Page 3 of 3 Operations Summary :Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 3/15/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/20/2008 Rig Name: NABOBS 3S Rig Number: Date'- From - To Hotars Task 'Code.. NPT Phase Description of Operations 3/18/2008 22;00 - 23:00 1.00 BUNCO RUNCMP into pipeshed and prep to run. 23:00 - 00:00 1.00 BUNCO RUNCMP P/U and M/U ESP. 3/19/2008 00:00 - 02:30 2.50 BUNCO RUNCMP M/U ESP, Pull ESP cable over dual ESP sheave. Attach ESP 02:30 - 09:30 I 7.00 09:30 - 00:00 ~ 14.50 3/20/2008 00:00 - 04:30 4.50 04:30 - 05:00 I 0.50 I RU 05:00 - 06:00 1.00 RUN 06:00 - 09:00 3.00 RUN cable to ESP. RUNCMP RIH with ESP com letion icking up 2-7/8" 6.5#, L-80, EUE 8rd to ing from pipeshed. Use Best-O-Life 2000 pipe dope. Make up torque of 2,300 ft/Ibs. Maintain continious hole fill of 30 boh., Check ESP cable every 2,000' and flush the ESP pump with 10 bbls of seawater. RUNCMP Start to run Heat trace 15' in on joint # 99. Maintain continious hole fill of 30 bph while RIH. Check ESP and Heat Trace every 2,000' and flush ESP with 10 bbls of seawater. 175 joints in at 00:00 hrs. RUNCMP RIH with ESP completion and Heat Trace. Maintain continious hole fill of 30 bph while RIH. Check ESP and Heat Trace every 2,000' and flush ESP with 10 bbls of seawater. 1/2 bpm at 200 psi. Ran 209 joints of 2-7/8", 6.5#, L-80, EUE 8rd tubing. Up weight 50K, down weight 37K RUNCMP M/U and orient hanger. Install penetrators in hanger. Measure and cut ESP and Heat Trace cables. Clamping equipment run: 56 LaSalle / 5 Protectolators / 3 Armster cable guard / 1723 metal bands / 566 - 6' flat guards / 12 - 4' flat guards / 10 - 3' flat guards. RUNCMP R/U and splice ESP and Heat Trace cables. continious hole fill of 30 bph while making splice. RUNCMP Make ESP power cable and heat trace cable splices. Checks - ESP power cable: 3.0 ohms phase to phase / 1.85 gig ohms phase to ground. Phoenix sensor:. 1734 psi / 78 deg F ~ intake. Heat Trace cable: 60 gig ohms after 1 minute -phase to ground. 09:00 - 10:00 1.00 WHSUR P TUBHGR Land Tb han er w/ 48K PUW / 38K SOW. RILDS. Back out landing joint. 10:00 - 11:30 1.50 WHSUR P RUNCMP D rod TWC. Measure distance to engage ~ 1 9/16" and 5 turns. Test from above to 3500 psi w/ SW and chart for 10 minutes. Attempt to test from below by pumping in IA, but well on vaccum. Pump SW ~ 2 BPM, 110 psi for 30 minutes and chart. 11:30 - 16:30 5.00 WHSUR P OTHCMP Pump stack and ND BOPE. Set BOP stack on stand and lay over in moving cFadle. 16:30 - 21:00 4.50 WHSUR P OTHCMP Install adaptor flange and Tree. Test hanger void to 5,000 psi for 20 minutes, install flange on wing valve and test tree with diesel to 5,000 psi for 10 minutes. Perform final check on ESP and Heat Trace connections. Final readings on ESP of 3.8 ohms phase to phase, 1,670 psi bottom pressure, 81.8 degrees motor temp, 79.6 degrees intake temp. Heat trace reading of 4.2 phase to phase, and 168 gig ohms. 21:00 - 22:30 1.50 WHSUR P OTHCMP R/U lubricator and pull TWC, 0 psi tubing pressure. Install BPV. R/D lubricator. 22:30 - 00:00 1.50 WHSUR P OTHCMP Slip and cut drilling line, remove secondary annulus valve, secure tree and cellar. Rig released at 24:00 hours. rnniea: siur[uuo ~ a rzo rm Page 1 of 2 • Maunder, Thomas E (DOA) From: Davies, Stephen F (DOA) Sent: Tuesday, April 01, 2008 9:47 AM To: Roby, David S (DOA); Fleckenstein, Robert J (DOA); Maunder, Thomas E (DOA); Mahnken, Christine R (DOA) Subject: FW: MPH-19 / L1 -PTD #'s 207-136 & 207-137 Dave, Tom: FYI Bob F: for RBDMS Christine: Please print and place copies in well files for MPU H-19 and MPU H-19L1 Thanks, Steve D. From: Stewman, Sondra D [mailto:Sondra.Stewman@bp.com] Sent: Tuesday, April 01, 2008 9:37 AM To: Davies, Stephen F (DOA) Subject: FW: MPH-19 / L1 -PTD #`s 207-136 & 207-137 Steve, Please reference the following wells: Well Names: MPH-19 /MPH-19L1 Permit #'s: 207-136 / 207-137 API #: 50-029-23371-00-00 / 50-029-23371-60-00 MPH-19 Not on Production MPH-19L1 well began Production on March 25, 2008 Top of Slotted Liner: 7149' Bottom of Slotted Liner: 10737' Method of Operations is: ESP Date of Test: February 7, 2008 (Note: Due to problems with solids production that damaged the ESP we do not have proper Well Test data) Hours Tested: Unknown 24-Hour Rate /Oil-Bbl: 600 24-Hour Rate /Gas-Mcf: 200 24-Hour Rate /Water-Bbl: 60 Gas-Oil Ration: 333 Flow Tubing Pressure: 274 Casing Pressure: 360 4/7/2008 Page 2 of 2 Oil Gravity-AP1: Unavailable Sondra Stewman ADW Drilling Technologist Be real, 1~e present and Trost of all he POSIT'IVI;! 4/7/2008 • • WELL LOG TRANSMITTAL To: State of Alaska March 13, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data MPH-19 AK-MW-5355566 1 LIS formatted CD with verification listing. API#: 50-029-2337100-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. An,ho~ ,~Ql 8 Anchora e Alaska 99649-6612 g~ .. , ~ ~._..i ~ ;tea ~3a~ d ~: =~~~z~ ~ Date: Signed: -, ; STATE OF ALASKA 11/14/07 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: Contractor: Nabors Rig No.: 3S DATE: 3/18/2008 Rig Rep.: J.GrecolJ.Fritls Rig Phone: 659-4487 Rig Fax: 659- 4486 Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628 Rep.: W.HoffmanB.Burson Field/Unit tt< Well No.: MPU H-19 PTD ~ 2071360 Operation: Drlg: Workover: X Test: Initial: X Weeky: Test Pressure: Rams: 250/3500 Arundar. 250/3500 TEST DATA MISC. INSPECTIONS: Test Result Test Result Location Gen.: P Weq Sim P Housekeeping: P Drl. Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantity Size Test Result Annular Preventer 1 13 5/8 5000 P Pipe Rams 1 2 7/8 x 5 P Lower Pipe Rams Blind Rams 1 BI'ind P Choke Ln. Valves 1 3 1/t3" 5000 P HCR Valves 2 3 1/8" 5000 P !(ill Line Valves 1 21/16" 5000 P Check Valve 0 NA MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P Test Results Explor.: Bi-Weekly Valves: 250!3500 FLOOR SAFETY VALVES: Quantity Test RE Upper Kelty 1 NT Lower Kelly 1 NT Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 13 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3050 P Pressure After Closure 1575 P 200 psi Attained 30sec P Full Pressure Attained 2 min 20 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4(aa1925 Number of Failures: 0 Test Time: 6 Hours Comaonents tested ALL Repair or replacement of ec~ment w~ be made withs~ days. Notify the North 51ope Inspector 659-3607, follow with written confirmation to Supervises at: Remarks: Tested with 4112" and 2 7/8" test joints 24 HOUR NOTICE GNEN YES X NO Date 03/16/08 Time 1545 hrs start 2330 hrs Finish BOP Test (for rigs) BFL 11/14/07 By Lou Gramaldi Witness J.Fritts / B. Bursan Nabors 3S BOP Test MP H-19 3-18-DS.xls 01 /11 /OS ~~~~~~~~ NO. 4547 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Milne Pt. Well Job # Loa Description Date BL Color CD Z-06 11594523 STATIC TEMP LOG ~ - 09109!07 1 14-186 11975743 SBHP SURVEY 12/08107 1 14-02C 11767144 SBHP LOG - 11/02/07 1 H-24A 11963073 MEM CBL - ~ 11/30/07 1 C-35A 11624351 CEMENT BOND & GRAVEL PACK --a 11/03/07 1 MPH-19 11982423 USIT - (O ~ 12/10/07 1 1 E-03A 11628773 MEM PROD PROFILE - ~ 05109/07 1 E-116 11434760 OH LDWG EDIT (DSI) - G ~ 10/29106 1 1 G-06A 11209587 MCNL - (~ ~-~ 02/25/06 1 1 D-07B 11162822 MCNL rj'- ~ ~ 12/04/05 1 1 G-10C 11209607 MCNL Q(p - a 06/15106 1 1 G-096 11649989 MCNL ,~ ~. - d i p ( 5~ ~ 09/11/07 1 1 K-086 11745243 MCNL g '~ ~ 11/06/07 1 1 V-07 11978425 COMPOSITE CBL 12106/07 1 V-07 11978425 USIT - t 12/06107 1 L2-33 11970801 RST j - (7 ~ 07107/07 1 1 03-14A 40013340 OH MWDILWD EDIT ~ ( 04/23/06 2 1 ~~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 9 ~ ~ ' Date Delivered: °~' ~ ~~~~~ ~~' ~~~~ ~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received by: • Maunder, Thomas E (DOA) From: Regg, James B {DOA) Sent: Tuesday, March 04, 2008 9:34 AM 70: NSU, ADW Drlg 3S Toolpusher, Menke, John B; aogcc~rudhoe bay~admin.state.ak.us; Fleckenstein, Robert J {DOA); Maunder, Thomas E {DOA) Subject: f2E: l=mailing:. iVabors 3S BOP Test MP H-19 2-29-08.xls Report should show "FP" for HCR valve and IBOP; 2 failures Jim Regg AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 phone: 907-793-1236 fax: 907-276-7542 -----Original Message----- From: NSU, ADW Drlg 3S Toolpusher [mailto:adwds35tnsu@bp.com) Sent: Saturday, March O1, 2008 7:10 AM To: Menke, John B; aogcc_prudhoe bay@admin.state.ak.us; Fleckenstein, Robert J (DOA); Maunder, Thomas E (DOA) Subject: Emailing: Nabors 3S BOP Test MP H-19 2-29-08.x1s «Nabors 3S BOP Test MP H-19 2-29-08.x1s » The message is ready to be sent with the following file or link attachments: Nabors 3S BOP Test MP H-19 2-29-08.x1s Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. 1 STATE OF ALASKA 'v'4~o' OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Submit to: Contractor: Nabors Rig Rep.: J.Greco/R.Bjorhus Operator. BP Rep.: J.Menke/D.Rhodes Field/Unit 8~ Well No.: MPU H-19 Operation: Drlg: Test: Initial: X Test Pressure: Rams: 250/3500 Rig No.: 3S DATE: 2/29/2008 Rig Phor~: 659-4487 Rig Fax: 659- 4486 Op. Phone: 659- 4485 Op. Fax: 659-4628 PTD #2071360 Workover X Explor.: Weekly: Bi-Weekly Armor. 250!3500 Valves: 250/3500 TEST DATA MISC. INSPECTIONS: FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P WeN Sign P Upper Kelly 1 NT Housekeeping: P Dr1. Rig P Lower Kelly 1 NT PTD On Location P Hazard Sec. P Ball Type 1 P Standing Order Posted P Inside BOP 1 P BOP STACK: Quantity Size Test Result CHOKE MANIFOLD: Annular Preventer 1 135/8 5000 P Quantity Test Result Pipe Rams 1 2 718 x 5 P No. Naives 13 P Lower Pipe Rams Manual Chokes 1 P Blind Rams 1 B~td P _ Hy~a Chokes 1 P Choke Ln. Valves 1 3118" 50E10 P HCR Valves 2 3 1/8" 5000 P ACCUMULATOR SYSTEM: Kill Line Valves 1 2 1/16" 5000 P Time/Pressure Test Result Check Valve 0 NA System Pressure 3000 P Pressure After Closure 1500 P MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 28sec P Trip Tank P P _ _ __ F~ Press~xe Attained 2 min 45 sec P Pit Level Indicators P P Bra Switch Covers: AA stations P Flow Indicator P P Nitgn. Bottles (avg}: 41825 Meth Gas Detector P P H2S Gas Detector P P Test Results Number of Failures: 0 Test Time: 11 Hours Componerrts tested ALL Repair or replacement of equ~ment wil be made within days. Notify the North Slope Inspector 659-3607, follow with written confxmation to Superviser at: Remarks: Kill line HCR leaked out vahre stem packinsr, s~eased retest Good, inside B.O.P. connection leaked, 24 HOUR NOTICE GIVEN YES X NO Waived By Bob Noble Date 02/2$108 Time 14:00 W'Mess J.Greco/J.Menke Test start BOP Test (for rigs) BFL 11/14/07 Fish Nabors 3S BOP Test MP H-19 2-29-08.x1s STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ' WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~~~~ JAN ~ X008 a~__r._ M.~~ s 1a. Well Status: ®Oily ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 e I as ®Develor{~Exploratory ^ Service ~ ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 12/19/2007 12. Permit to Drill Number 207-136 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 11/29/2007 13. API Number 50-029-23371-00-00 s 4a. Location of Well (Governmental Section): Surface: 29 ' ' ~ 7. Date T.D. Reached 12/6/2007 14. Well Name and Number: MPH-19 54 FSL, 4132 FEL, SEC. 34, T13N, R10E, UM Top of Productive Horizon: 4301' FSL, 506' FEL, SEC. 34, T13N, R10E, UM 8. KB (ft above MSL): 70' Ground (ft MSL): 35.9' 15. Field /Pool(s): Milne Point Unit / Schrader Bluff . Total Depth: 4002' FSL, 179' FEL, SEC. 34, T13N, R10E, UM 9. Plug Back Depth (MD+TVD) 6871 4152 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 556512 - y- 6010105 -Zone- ASP4 10. Total Depth (MD+TVD) ~ 7620 4260 ~ 16. Property Designation: ADL 025518 ' TPI: x- 560125 y- 6011480 Zone- ASP4 Total Depth: x- 560455 - y- 6011183 'Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ®Yes ^ No mi I r ni and rint inform ion r 20 AA 2.50 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): l'l'lG/' ~,/S17 4899=-{~tpprox.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): /•t3•~ DIR, GR, RES, GYRO, NEU, DEN, GeoTap, IFR/CASANDRA, USIT, CCL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HALE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM .SIZE CEMENTING RECORD PULLED 20" 92# H-4 urface 112' rf 112' 42" 260 x Ar is Set A rox. 1 -314" 45.5# L-80 36' 3814' 2928' 1 -1/2" 6 0 x D e rete 2 2 sx Lit r 23. Open to production or inject ion? ^Yes ®No 24. TU61NG RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER .SET MD None 4-1/2", 12.6#, L-80 6651' MD TVD MD ND 25. Acro, FRACTURE. CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED Freeze Protected with 95 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not On Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCf: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CALCULATED 24HouR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVnY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A uired? Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. -,~ ~:~~' t:8`~ i I Y.l.Y;~ t bC. None s t r.~ Form 10-407 ReVISed 02/2007 CONTINUED ON REVERSE SIDE < ~ ~~ p\ ~ 2~ ~~ X28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No ` Permafrost Top 0' 0' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1800' 1779' ~ detailed test information per 20 AAC 25.071. Ugnu-MA 5998' 3823' Ugnu-M61 6052' 3843' None Ugnu-M82 6170' 3885' Ugnu-MC 6528' 4027' SBF2-NA 6594' 4052' SBF1-NB 6669' 4080' TSBD /Top 'OA' 6862' 4149' TSBC -Base 'OA' 6970' 4179' TSBB - Top'OB' 7315' 4213' TSBAS /Base 'OB 7500' 4240' Formation at Total Depth (Name): SBAS 7620' 4260' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and aLeak-Off Test Summary. 31. I hereby certify that the for going is true and correct to the best of my knowledge. pp~~ 1 Signed Son Stewm Title Drilling Technologist Dat~1~ ^ ` ` Q~ MPH-19 207-136 Prepared ByNameMumber. Sondra Stewman, 564-4750 Well Number Drilling Engineer: Paul Hanson, 564-4195 P rmit No. ! A r v l No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Akernating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form andinarty attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (muRiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description. and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Tree: 4 1/16" - 5M Cameron Wellhead: 11" 5M FMC Gen 5 w/ 2 7/8" FMC Tubing Hanger ,EUE lift threads, 2.5" CIW H BPV profile 20" 91.1 ppf, H-40, cond. 115' KOP @ 720' Max. hole angle = 70° - 87° from 3218' to 7239' L-1 Max hole angle=71 °-95° from 6859` to 10,780' 10 3/4", 45.5#, L-80 Btc. 3814` 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg.. ( drift ID = 2.347") Camco KBMG-M-2 202' 2-7/8" x 1" X Nipple (2.313") 2060' 2.250" ID AVA Ported Nipple(2.441" ID) 6545' with Isolation Sleeve(1.87" ID) Centrilift Pump 6590` SXD / 142P23 7 5/8" 29.7#, L-80, Btrc. production casing -: -- Gas Separator 6611' ( drift ID = 6.75", cap. = 0.0383 bpf) GRSFTXARH6 Tandem Seal Sections 6616` GSB3DBFERHLSS/CVH6PFSA Motor- KMH/190hp 6630` 2415 volt / 48 amp Phoenix XT-0 Sensor 6646' w/ Centralizer Baker Production Liner Hanger Assembly 5.5"x 7.63"- "H R" ZXP Liner Top Pkr. 5.5"- "RS" Packoff Seal Nipple - 6701` 7.63" x 5.5"- Flex-Lock Liner Hanger - 6720` Milled csg. window from 6871' - 6882' Whipstock set in Mother Sore Top - 6870' Bottom - 6884' 4.5" shoe @ 10737` 4.5" x 6 38" x TAM Swell Pkrs. 7708` 8128' 9457' 10099' 4 5" 12 6# L-80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193` - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972 I 7" casing shoe 7584` DATE REV. BY COMMENTS 12/19/07 REH Drill and Complete w/ESP by Doyon 14 M P U H-19~~-- I ~ Orig. DF elev. = 70.2' (Doyon 14) i Orig. GL elev.= 34.1 ` (Doyon 14) ~ Orig. DF elev.= 70' (Doyon 14) MILNE POINT UNIT WELL H-19 API NO: 50-029-23371 ~ BP EXPLORATION (AK) ~ • $P AMERI`Cq Page 1 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/24/2007 17:00 - 19:00 2.00 RIGD P PRE PJSM -Skid rig floor to moving position 19:00 - 20:30 1.50 MOB P PRE Move rig off well H-146 20:30 - 22:00 1.50 MOB P PRE Remove cellar doors and install back booster 22:00 - 00:00 2.00 MOB P PRE Install booster rack and front booster 11/25/2007 00:00 - 01:30 1.50 MOB P PRE Move rig down H-pad to pad entrance 01:30 - 05:30 4.00 MOB P PRE Wait on Security. Troubleshoot booster operation 05:30 - 09:00 3.50 MOB P PRE Move rig from H-pad to Spine Rd. Fuel rig 09:00 - 12:00 3.00 MOB P PRE Move rig to Kuparuk river bridge. Wait on traffic/Security 12:00 - 00:00 12.00 MOB P PRE Move rig from Kuparuk river bridge to aprox. 5 miles down Milne Point main road 11/26/2007 00:00 - 02:30 2.50 MOB P PRE Cont. moving rig down Milne Point main road 02:30 - 23:00 20.50 MOB P PRE Stop move due to flat fire (front). Waiting for fire replacement. Rig located on Milne Point main road, between MPU-S pad access road and Milne Point camp. NOTE: new tires are transported on rolligon. Rolligon has to travel off road around rig to position tires on front side. 23:00 - 00:00 1.00 MOB P PRE Rolligon arrived w/ new tires. Unload rolligon NOTE: Rolligon broke down on its way to the rig. 11/27/2007 00:00 - 07:30 7.50 MOB P PRE Remove booster tires, booster frame, main cross frame support and garage door -Replace two tires on right front side of rig 07:30 - 10:00 2.50 MOB P PRE Move rig down Milne Point main road to Milne Point camp "Y" 10:00 - 12:00 2.00 MOB P PRE Replace garage door, main cross frame and booster frame 12:00 - 13:00 1.00 MOB P PRE Install front booster 13:00 - 16:30 3.50 MOB P PRE Move rig from Milne Point camp "Y" to MPU-H pad 16:30 - 19:00 2.50 MOB P PRE Remove back booster -Install doors -Place diverter in cellar 19:00 - 23:30 4.50 MOB P PRE Spot rig over well MPH-19 and shim 23:30 - 00:00 0.50 RIGU P PRE Skid rig floor to drilling position 11/28/2007 00:00 - 06:30 6.50 RIGU P PRE Accept rig at 00:00 11-28-2007 NU diverter and knife valve -Taking spud mud in pits - Changing saver sub to 4 1/2" IF 06:30 - 07:30 1.00 RIGD P PRE Load pipe shed w/ motor, MWD tools, jars, 105 jts 5" DP & 17 jts 5" HWT -Strap same 07:30 - 11:00 3.50 RIGU P PRE Finish changing saver sub to 4 1/2" IF -Perform derrick inspection -Continue taking on spud mud 11:00 - 12:30 1.50 RIGU P PRE ATP w/ both crews, rig support personnel, Toolpusher, Wellsite Leader, MP Wells Operation Supervisor - MP Area Manager, MP Environmental Advisor and MP Safety Advisor. Several Topics of safety and environmental were discussed by MP representatives. Critical well issues were discussed by Wellsite Leader. 12:30 - 14:30 2.00 RIGU P PRE Finish RU surface stack, flow line, fill up line, etc. 14:30 - 20:30 . 6.00 DRILL P SURF PU 5" DP (105 jts), HWDP (17 jts) and Jars from pipe shed and rack back in derrick 20:30 - 21:00 0.50 DIVRTR P SURF Test diverter. Test witnessed b WSL. Jeff Jones, AOGCC Rep, waived witness of test. 21:00 - 22:00 1.00 DRILL P SURF Mobilize BHA components to rig floor 22:00 - 23:00 1.00 DRILL P SURF MU BNA: Bit -Mud Motor -Float Sub -Stab - UBHO Sub - XO 23:00 - 23:30 0.50 DRILL P SURF RU Gyro equipment 23:30 - 00:00 0.50 DRILL P SURF Hold pre-spud meeting with rig crew and service hands 11/29/2007 00:00 - 01:00 1.00 DRILL P SURF Spud well. Drill to 157' w/HWDP Printed: 1/7/2008 3:36:39 PM ~ • BP AMERICA Page 2 of 14 Operations Summary Report ,Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 'Rig Name: DOYON 14 Rig Number: Date From - To Hours Task "Code NPT Phase Description of Operations 11/29/2007 01:00 - 02:30 1.50 DRILL N RREP SURF Repair conveyor #1: change sprocket 02:30 - 04:30 2.00 DRILL P SURF Drill surface hole f/ 157' to 282' w/HWDP, taking Gyro surveys 04:30 - 05:00 0.50 DRILL P SURF POH f/ 282' to 60' to add MWD and flex collars to BHA 05:00 - 09:00 4.00 DRILL P SURF MU MWD, orient and download - MU Flex collars -Test MWD 09:00 - 12:00 3.00 DRILL P SURF Dir. drill f/ 282' to 476', taking Gyro surveys every stand. 500 gpm / 1140 psi -PUW: 35k /SOW: 35k / ROTW: 35k - TOon: 2k / TOoff: 1 k 12:00 - 00:00 12.00 DRILL P SURF Dir. drill f/ 476' to 1,285'. Take Gyro surveys every stand to 720' 550 gpm / 1650 psi -PUW: 97k /SOW: 97k / ROTW: 97k - TOon: 4k / TOoff: 2k 11/30/2007 00:00 - 12:00 12.00 DRILL P SURF Dir. drill f/ 1,285' to 2,513' - 558 GPM, 1920 psi on - 1740 off - Tq on 4k -off 3k - WOB 15k -PUW 120k -SOW 110k -ROW 115k -Appeared to reach base of Permafrost at +-1700' early sions of hvdrates at +-1850' 12:00 - 13:00 1.00 DRILL P SURF CBU 2x 13:00 - 15:00 2.00 DRILL P SURF Observe well -Pump out of hole to BHA at 720' w/ 560 GPM 1740 psi 15:00 - 16:00 1.00 DRILL P SURF RIH to 2,420' -Wash last stand to bottom at 2,513' w/ no issues. 16:00 - 00:00 8.00 DRILL P SURF Dir. drill f/ 2,513' to 3,172' - 550 GPM, 1890 psi on / 1690 psi off - Tq on 7k /off 4k - WOB 25k -PUW 125k -SOW 102k - ROW 115k 12/1/2007 00:00 - 06:30 6.50 DRILL P SURF Dir. drill f/ 3,172' to 3,825' (13 1/2" section TD) 550 gpm - 1720 psi off, 1750 on - Tq = 4k off, 5-9k on w/ 80 rpm - 25k WOB -AST .73 -ART 3.21 - ADT 3.94 hrs -PUW 127k, SOW 95k, RTW 112k 06:30 - 08:00 1.50 DRILL P SURF CBU x2 - 550 gpm 1770 psi - R&R DP w/ 80 rpm 08:00 - 12:00 4.00 DRILL P SURF Observe well 15 min -Pump out of hole w/ full drlg rate to 635' 12:00 - 14:00 2.00 DRILL P SURF RIH to 3,742' w/ no issues 14:00 - 16:30 2.50 DRILL P SURF Screw in TD -Wash last stand to bottom at 3,825' -CBU x3 w/ 550 gpm 1800 psi - R&R Dp w/ 100 rpm 6k tq 16:30 - 19:30 3.00 DRILL P SURF Observe well -Pump out of hole w/ full drlg rate to HWDP @ 720' 19:30 - 20:00 0.50 DRILL P SURF Stand back HWDP and jars in derrick 20:00 - 20:30 0.50 DRILL P SURF LD flex collars 20:30 - 21:30 1.00 DRILL P SURF Down load MWD 21:30 - 23:00 1.50 DRILL P SURF LD MWD and stabilizer -Break bit - LD mud motor 23:00 - 00:00 1.00 DRILL P SURF Clear rig floor 12/2/2007 00:00 - 01:00 1.00 CASE P SURF RU to run 10-3/4" casing 01:00 - 05:00 4.00 CASE P SURF PJSM -Run 10-3/4" 45.5# L-80 BTC casing to +/- 2,740', breaking circulation every 10 joints. Straight blade centralizers. on first 53 jts as per plan. 05:00 - 06:00 1.00 CASE P SURF Pipe taking weight +/- 2,740'. Break circulation. Work down through tight spot f/ 2,740'-2,900' 06:00 - 08:00 2.00 CASE P SURF Continue run 10 3/4" casing - PU landing joint and mandrel hanger -Wash down and land hanger w/ 10 3/4" shoe at 3.814' __ - PU 1' from landing ring. Total jts run: 92 08:00 - 10:30 2.50 CASE P SURF Circulate and condition /thin mud for cement job, 6.5 bpm 430 psi 10:30 - 11:30 1.00 CASE P SURF RD Franks fill up tool - RU Dowelf cement head 11:30 - 13:00 1.50 CASE P SURF Hold PJSM w/ cementers while circulating casing voume at 6.5 Printed: 1/7/2008 3:36:39 PM i • BP AMERICA Page 3 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/2/2007 11:30 - 13:00 1.50 CASE P SURF bpm 190 psi 13:00 - 15:30 2.50 CEMT P SURF Give to Schlumberger -Pump 5 bbls H2O -Test lines to 3,000 psi -Pump 90 bbls Mud Push at 10 ppg -Drop bottom plug -Pump Lead - 411 bbls Deep Crete at 10.7 ppg (600 sx yield 3.85 ft3/sx) -Pump Tail - 100 bbls Deep Crete at 12.5 ppg (252 sx yield 2.23 ft3/sx) -Kick out top plug w/ 10 bbls H2O 15:30 - 17:00 I 1.501 CEMT I P SURF Displace cement w/ rig pumps - 7 bpm 270 psi -Sumo alua at 3,540 stks w/ 2,500 asi (2,000 p 17:00 - 18:00 I 1.00 I CASE I P 18:00 - 19:30 I 1.501 CASE I P 19:30 - 22:00 I 2.501 DIVRTR I P 22:00 - 23:00 1.001 WHSUR P SURF SURF SURF SURF 23:00 - 00:00 1.00 BOPSU P SURF 12/3/2007 00:00 - 02:30 2.50 BOPSU P SURF 02:30 - 04:00 1.50 BOPSU P SURF 04:00 - 10:00 6.00 BOPSU P SURF 10:00 - 11:00 1.00 BOPSU P SURF 11:00 - 11:30 0.50 CASE P SURF 11:30 - 12:30 1.00 CASE P SURF 12:30 - 13:30 1.00 CASE N RREP SURF 13:30 - 17:00 3.50 CASE P SURF 17:00 - 18:30 1.50 CASE P SURF 18:30 - 20:00 1.50 CASE P SURF 20:00 - 20:30 0.50 CASE P SURF 20:30 - 21:30 1.00 CASE P SURF 21:30 - 22:00 0.50 CASE P SURF 22:00 - 00:00 2.00 CASE P SURF 12/4/2007 00:00 - 02:30 2.50 CASE P SURF 02:30 - 03:30 1.00 CASE P SURF 03:30 - 04:00 0.50 CASE P SURF 04:00 - 05:30 1.50 CASE P SURF 05:30 - 08:00 I 2.501 CASE I P I I SURF -CIP at 17:00 hrs. -140 bbls good cement back to suface Hold 2,500 psi on plug f/ 30 min on chart -Good casing test - Bleed off pressure -Check floats - OK - LD Cement head LD landing joint -Flush stack -Jet flow line and blow down fill up lines ND diverter system -Separate bag from knife valve assy. - Remove both from cellar Install casing head and tubing spool. Test metal to metal seal to 1,000 psi x 10 min per FMC NU BOP. Continue NU BOP Install test plug - RU to test BOP PJSM - hest BOP and related equipment per BP / AOGCC regulations and procedures -Test to 250 psi low - 3,500 psi high (annular preventer to 250 psi low - 2,500 psi high) x 5 min each. Chart tests. Test w/ 5" testjoint. Test top and bottom rams w/ 5" & 4" test joints. Test witnessed by WSL and Toolpusher. Chuck Scheve, AOGCC rep, waived witness of test. RD test equipment -Pull test plug and install wear ring Move HWDP in derrick f/ DS to ODS (will use DS to rack back 4" DP) PU and RIH 4" DP f/ pipe shed Troubleshoot and remove air blockage in drawworks clutch Cont. PU and RIH 4" DP f/ pipe shed. Total jts PU: 114 Cut and slip drilling line -Service top drive -Circulate DP volume 190 gpm, 200 psi POH and rack back 4" DP (Winds 30-50 MPH) Circ. to balance mud Contnue POH w/ 4" DP (Winds 30-50 MPH) Mobilize BHA to rig floor PJSM - MU BHA per program Upload MWD -Shallow test MWD -Load nukes. Continue to M/U BHA: -Flex collars, HWDP, jars and XOs - C/O elevators. RIH on 4" DP, PU 18 jts f/ pipe shed. Continue to RIH on 4" DP f/ derrick to 3,685' md. -Change elevators -RIH w/ 5" DP to 3,781' md. Screw in Top Drive -Break circulation. Printed: 1/7/2008 3:36:39 PM • ~ $P AMERICA Page 4 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 12/4/2007 05:30 - 08:00 2.50 CASE P SURF -Obtain parameters. -Tag Float Collar at 3,728' md. -Drill Float Collar, cement, shoe track and 20' of new hole to 3,845' md. 08:00 - 08:30 0.50 CASE P SURF CBU w/ 350 gpm, 1520 psi. -Reciprocate & Rotate DP w/ 60 RPM. 08:30 - 09:30 1.00 CASE P SURF Displace well w/ 8.7 ppg LSND mud. -510 gpm, 1800 psi. -Reciprocate & Rotate DP w/ 60 rpm. 09:30 - 10:00 0.50 CASE P SURF Blow down Top Drive. -R/U to perform FIT. -Clean surface equipment. 10:00 - 11:00 1.00 CASE P SURF Perform FIT w/ 8.7 ppg LSND -2,919' TVD, 425 psi = 11.5 EMW. -Good Test. -R/D test equipment. -Obtain SPRs. 11:00 - 12:00 1.00 DRILL P INT1 Directionally Drill f/ 3,845' to 3,868' md. -P/U= 120K -SOW= 85K -ROT wt= 100K. - 500 gpm / 1740 psi off - 1900 psi on. - 80 rpm, 4K Tq off - 6k Tq on. -AST= 0, ART= 0.47, ADT= 0.47 hrs. 12:00 - 00:00 12.00 DRILL P INT1 Directionally Drill f/ 3,868' to 5,288' md. -P/U= 137K -SOW= 100K -ROT wt= 112K. - 550 gpm / 2250 psi off - 2420 psi on. - 100 rpm, 4K Tq off - 7K Tq on. -Daily total= AST= 3.23, ART= 4.05, ADT= 7.28 hrs. -Shaker screens= 170s. .12/5/2007 00:00 - 06:30 6.50 DRILL P INT1 Drill from 5,288' to 6,043' md. '~, -P/U= 170K, SOW= 100K, ROT wt= 125K. -550 gpm / 2260 psi off - 2340 psi on. -100 rpm, 7K tq off - 9K tq on. W06= 5K. -AST= 2.13, ART= 2.0, ADT= 4.13 hrs. 06:30 - 08:00 1.50 DRILL P INT1 CBU x 2. -Rotate & Reciprocate @ 100 rpm while pumping. -550 gpm / 2200 psi. -Flow check well -Static. 08:00 - 11:00 3.00 DRILL P INT1 Short trip, pump out of hole @ drilling rate t/ 3,779' md. -Sticky pulling thru shoe. -Work into Csg @ 3,814' md. 11:00 - 12:00 1.00 DRILL P INT1 Circulate until shakers are clean. -Large clay balls and chunks of coal observed. -450 gpm / 1740 psi. -Rotate & Reciprocate @ 50 rpm. 12:00 - 12:30 0.50 DRILL P INT1 RIH (4 stds) f/ 3,814' to 4,262' md. -Pull back thru shoe. No problems encountered. 12:30 - 14:00 1.50 DRILL P INT1 RIH f/ 3,814' to 6,043' md. -Wash last stand to bottom. 14:00 - 00:00 10.00 DRILL P INT1 Directionally Drill f/ 6,043' to 6,828' md. -P/U= 155K, SOW= 110K, ROT wt= 126K. -550gpm / 2330 psi off, 2450 psi on. -80 rpm, 6K tq off - 7K tq on. -AST= 3.77, ART=6.61, ADT= 10.38 hrs. Printed: 1/7/2008 3:36:39 PM ~ r $P AMERICA Page 5 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/6/2007 00:00 - 08:30 8.50 DRILL P INT1 Directionally drill f/ 6,828' to TD @ 7,620' and / 4,260' TVD. -P/U= 150K, SOW= 110K, ROT wt= 125K. -650 gpm / 2490 psi off, 2600 psi on. -100 rpm / Tq off= 5K, Tq on= 5-8K. WOB=7K. -AST= 1.6, ART= 2.85, ADT= 4.45 hrs. 08:30 - 11:00 2.50 DRILL P INT1 CBU x 3. -550 gpm / 2580 psi. -Rotate @ 120 rpm & Reciprocate Drill String. -Flow Check Well -Static. 11:00 - 12:00 1.00 DRILL P INT1 Pump out of hole. -Mad Pass per Geologist f/ 7,620' to 7,450' md. -550 gpm / 2120 psi, 70 rpm. ~ 12:00 - 14:30 2.50 DRILL P INT1 Pump out of hole and continue Mad Pass f/ 7,450' to 6,988' md. -550 gpm / 2120 psi, 70 rpm. 14:30 - 17:00 2.50 DRILL P INT1 Pump out of hole @ reduced rate. -Noted pressure loss. -Pump out f/ 6,988 to +/- 5,800' looking for washout. -320 gpm / 600 psi. -Found washout at +/- 1,800' from surface. -Washout is 18" below tool jt. -Continue to pump out of hole @ drilling rate to 4,638' md. 17:00 - 18:00 1.00 DRILL P INT1 CBU x 1.5 @ top of 4" DP at 4,638' md. -530 gpm / 2330 psi. -Rotate & Reciprocate. -100 rpm. Tq= 4K. 18:00 - 18:30 0.50 DRILL INT1 Pull 6 stds 4" DP t/ 4,067' and and rack back on Driller's side. -Replace with 6 stds 5" DP t/ 4,638' md. 18:30 - 23:00 4.50 DRILL P INT1 RIH and complete Mad Pass per Geologist. -Mad Pass f/ 6,049' -5,949' and 6,988'- 6,600' md. -RIH to TD @ 7,620' md. 23:00 - 00:00 1.00 DRILL P INT1 Pump Hi-Vis Sweep and CBU x 3. -Stand back 1 std after CBU x 1.5. -550 gpm / 2600 psi. -Rotate and Reciprocate. -120 rpm, Tq= 6K. 12/7/2007 00:00 - 01:30 1.50 DRILL P INT1 CBU x 3 @ TD. - (7,620' and / 4,260' tvd). -550 gpm / 2600 psi. -120 rpm, Tq =6K. 01:30 - 05:00 3.50 DRILL P INT1 Pump out of the hole f/ 7,620' to 4,351' md. -550 gpm / 2600 psi. 05:00 - 05:30 0.50 DRILL P INT1 CBU @ 4,351' md. -530 gpm / 2260 psi. -Rotate @ 50 rpm & Reciprocate drill string. 05:30 - 06:00 0.50 DRILL P INT1 POH t/ 3,775' md. (inside Csg) 06:00 - 07:00 1.00 DRILL P INT1 CBU. -520 gpm / 2010 psi & 50 rpm. -Flow check well -Static. -Pump dry job. -Mud wt in= 9.0 ppg, Mud wt out= 9.0+ ppg. 07:00 - 08:00 1.00 DRILL P INT1 POH t/ 752' md. 08:00 - 09:30 1.50 DRILL P INT1 UD HWDP, Jars & Flex DCs. 09:30 - 12:00 2.50 DRILL P INT1 PJSM -Handling Nuclear Sources. Printed: 1/7/2008 3:36:39 PM • BP AMERICA Page 6 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: ' Date From - To Hours Task Code NPT :Phase Description of Operations 12/7/2007 09:30 - 12:00 2.50 DRILL P INT1 -Pull Nuclear Sources. -Download MWD data. 12:00 - 13:30 1.50 DRILL P INT1 Flush remaining BHA. -L/D Stabilizer, Float Sub, and Motor. -Break and L/D bit. 13:30 - 14:00 0.50 DRILL P INT1 Clear rig floor of MWD tools. 14:00 - 14:30 0.50 DRILL P INT1 Pull wear ring and install test plug in preparation for changing rams. 14:30 - 17:30 3.00 DRILL P INT1 PJSM -Changing Rams & Changing Saver Sub. (SIM OPS) -Change top rams to 7 5/8". -Change Saver Sub to 4" HT-38. 17:30 - 18:30 1.00 DRILL P INT1 R/U to test 7 5/8" rams. -Test @ 250 psi and 3500 psi. -Chart and hold each test for 5 minutes. -Good Test. 18;30 - 20:30 2.00 CASE P INT1 R!U to run 7 5/8" 29.7# BTC-M /Vam Top Casing. -Change out to long bails and 350 ton casing elevators and slips. -Install Frank's Fill Up Tool. -R/U power tongs and Torque Turn. -PJSM -Running 7 5/8" Casing. 20:30 - 00:00 3.50 CASE P INT1 Run 7 5/8" 29.7# BTC-M /Vam Top casing per running order to 1,360' md. -M/U Torque for BTC-M = 9000 -M/U Torque for Vam Top = 9400 -Dope all BTC-M connections using Best O Life 2000. -Dope all Vam Top connections using Jet Lube Seal Guard. -2 straight bladed centralizers per jt on jt #s 1-18 & 20 (#19 is window jt). -1 straight bladed centralizer per jt on jt #s 21-61. -Fill pipe every jt. 12/8/2007 00:00 - 03:30 3.50 CASE P INT1 Continue to run in hole w/ 7 5/8" Csg to 3,781' md. 03:30 - 04:00 0.50 CASE P INT1 Circulate 1- 7 5/8" casing volume inside 10 3/4" Csg. -252 gpm / 350 psi. 04:00 - 11:00 7.00 CASE P INT1 Continue to run in hole w/ 7 5/8" Csg. -Break circulation every 20 jts. -Wash last jt to bottom. - P/U wt= 225K, SOW= 125K. -168 gpm / 350 psi. 11:00 - 12:00 1.00 CASE P INT1 Space out for cement job. 12:00 - 12:30 0.50 CASE P INT1 M/U XO f/ Cmt head, M/U Cmt hose & valves. 12:30 - 16:30 4.00 CASE P INT1 Circulate & condition mud for Cmtjob. -Mud wt= 9.0 ppg, Mud vis= 40 sec/qt. -Reciprocate pipe through out entire cement job. P/U= 225K, SOW= 125K. -PJSM on Cmtjob. -Cement w/ - 5 bbls H2O, Test lines to 4000 psi. -Pump 50 bbls Mud push II @ 11.5 ppg. -Drop bottom plug. -Pump 170 bbls Cement tail @ 15.8 ppg. -Drop top plug. Pump 10 bbls H2O. -Displace w/ Rig pumps. -Plug bumped, pressure up 1500 psi over circ Psi.. Printed: 1/7/2008 3:36:39 PM $P AMERICA Page 7 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/8/2007 12:30 - 16:30 4.00 CASE P INT1 -Hold f/ 10 minutes to check floats. 16:30 - 17:00 0.50 CASE P INT1 Rig down cement hose, T valves, Cmt head. -R/D XO, drain stack, suck out Csg. 17:00 - 17:30 0.50 CASE P INT1 Nipple down Flow line, Riser, Hole fill line. -N/D Bleed off line, break connection on Tbg spool. 17:30 - 21:30 4.00 CASE P INT1 Set E-Slips, Cut Csg w/ Wachs cutter. -Cut jt= 18.79'. Set packoff. 21:30 - 23:00 1.50 CASE P INT1 Nipple up BOPs, Adjust Riser. -Install Flow line. Tighten turn buckles. -Test pack off t/ 3800 psi f/ 10 minutes -Pass. -Inject down 10 3/4" X 7 5/8" annulus. -Inject 30 bbls / 2 bpm. Mud wt= 9.0 ppg. -Formation break down @ 1200 psi, w/ 14 bbls away. -Injection rate @ 1150 psi / 2 bpm. -Bleed down pressure= 800 psi. -Continue to inject 5 bbls every hr until freeze protected. 23:00 - 23:30 0.50 CASE P INT1 Clear floor of Csg equipment. -P/U test jt. P/U test plug. 23:30 - 00:00 0.50 CASE P INT1 PJSM- Discuss changing Rams. -Change out upper Rams. -Install test plug. -Pull 7 5/8", install 3 1/2" X 6" variables. 12/9/2007 00:00 - 01:00 1.00 CASE P INT1 Continue to change top Rams to 3 1/2" X 6" variables. 01:00 - 02:30 1.50 CASE P INT1 R/U to test BOPs. Test top Rams & Choke hose. -Test 250 psi high / 3500 psi low. -R/D test equipment. Pull test plug. -Install wear ring. 02:30 - 03:00 0.50 CASE P INT1 C/O Bell guide on Top Drive. -Attach Bales & elevators. 03:00 - 07:00 4.00 CASE P INT1 L/D 5" DP from mouse hole. 07:00 - 08:00 1.00 CASE P INT1 Mobilize Scraper BHA to rig floor. I~ -C/O elevators and Roughneck dies for 4" DP. 08:00 - 10:00 2.00 CASE P INT1 P/U & M/U Scraper tools. -RIH w/ DCs & Jars. -P/U HWDP f/ pipe shed &RIH t/ 472' md. 10:00 - 11:30 1.50 CASE P INT1 Cut & Slip Drilling Line. -Service Top Drive. 11:30 - 12:00 0.50 CASE P INT1 P/U 4" DP from pipe shed &RIH t/ 652' md. SIMOPS: freeze protect 10-3/4" x 7-5/8" OA: Little Red Svcs pump 100 bbls diesel - 2 bpm / 1,550 psi 12:00 - 18:00 6.00 CASE P INT1 P/U 4' DP from pipe shed &RIH t/ 6,894'md. -Fill pipe @ 3,949' md. 18:00 - 20:00 2.00 CASE P INT1 Wash & Ream f/ 6,894' to 6,974' md.(Tagged cmt ?6944', wash and reamed to 6974', took 10k weight on bit and was not drilling off set down with 15K on bit without rotating, picked up verify measurements and discovered 40' difference in casing strap, which put the float collar @ 6967') -376 gpm / 1440 psi. -30 rpm. Tq= 3K 20:00 - 20:30 0.50 CASE P INT1 Circulate & Condition mud. 20:30 - 23:30 3.00 CASE P INT1 Flow Check well. -Static -Pump Dry Job. -Blow Down Top Drive. Printed: 1/7/2008 3:36:39 PM 8~y._ i BP AMERfCA Page 8 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task .Code NPT Phase Description of Operations 12/9/2007 20:30 - 23:30 3.00 CASE P INT1 -POH f/ 6,974' to 472' md. 23:30 - 00:00 0.50 CASE P INT1 Rack back HWDP, Jars, XOs, & 2 stds DCs. 12/10/2007 00:00 - 01:00 1.00 CASE INT1 Stand back 1 std DCs. -Break bit and L/D. -L/D boot baskets and scraper. -L/D Bit sub, XO, & Float sub. 01:00 - 02:00 1.00 CASE INT1 PJSM- R/U & Running E-line. R/U Schlumberger E-line sheaves and tools. 02:00 - 05:30 3.50 CASE INT1 Schlumberger E-line RIH w/ USIT/ Gamma Ray / CCL f/ 6,965' and back to surface. 05:30 - 06:00 0.50 CASE INT1 R/D Schlumberger E-line. -Good logs. 06:00 - 07:00 1.00 CASE INT1 R/U & Test 7 5/8" Casing. -Hold @ 3000 psi for 30 minutes. Chart test. -Good test. -R/D test equipment. 07:00 - 10:30 3.50 CASE INT1 P/U Milling tools & Tubing handling tools to rig floor. -M/U mills and L/D in pipe shed. -Modify one jt 4 1/2" tubing for whipstock assy. 10:30 - 12:00 1.50 CASE INT1 M/U Tail pipe and Whipstock. -Attach mills and HWDP. 12:00 - 14;30 2.50 CASE INT1 M/U and program MWD tools. -M/U DCs and HWDP. -Function test MWD tools. - OK 14:30 - 19:30 5.00 CASE INT1 RIH w/ Whipstock f/ 570' to 6,800' and @ controlled rate. -Fill pipe every 20 stds. 19:30 - 21:00 1.50 CASE INT1 Obtain Milling Parameters. -Orient Whipstock to 14 degrees right of high side. -Tag TOC w/ Whipstock tailpipe @ 6,974' md. -Set Whipstock Anchor by setting down 9,500 lbs. -Shear Mills off top of Whipstock slide by setting down 35,000 lbs. -Top of Whipstock @ 6,870' md. Bottom of Whipstock @ 6,884' md. 21:00 - 00:00 3.00 CASE INT1 Mill Window f/ 6,871' to 6,882' md. -P/U= 148K, SOW=90K, Rot Wt.= 107K. -240 gpm / 1100 psi. -Tq off= 6K, Tq on= 7-10K. ~/~,, - ' t P~`~ ~ ~- ~ -Top of Window @ 6,871' md. -OA pressure = 410 psi @ 2200 hrs 2 11%2007 00:00 - 00:30 0.50 CASE P INT1 Finish Milling Window& Mill 20' of new hole f/ 6,882' to 6,903' md. -P/U= 145K, SOW= 85K, Rot Wt=107K. -535 gpm /off btm= 1150 psi, on btm= 1260 psi. -120 rpm. Tq= 6K. 00:30 - 02:00 1.50 CASE P INT1 Work through window to assure full gauge opening. -Zero overpull noted rotating through window. -6K overpull noted while tripping through window. -Pump Hi-Vis sweep. 02:00 - 04:00 2.00 CASE P INT1 Displace well to 9.0 ppg FloPro. -Pump Spacer #1 - 40 bbls 9.5 ppg FloPro. -Pump Spacer #2 - 40 bbls Water. -Pump Spacer 3# - 40 bbls FloPro w/ 2 sks Flo-Vis. Printed: 1/7/2008 3:36:39 PM BP AMERICA Page 9 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/11/2007 02:00 - 04:00 2.00 CASE P INT1 -Chase Spacer #3 w/ +/-322 bbls new FloPro. -Fill pits with remaining 468 bbls of new FloPro. 04:00 - 04:30 0.50 CASE P INT1 -Flow Check Well. -Static -Clean Surface equipment. -Pump Dry Job. 04:30 - 07:00 2.50 CASE P INT1 POH for Drilling Assembly f/ 6,865' to 466' md. 07:00 - 07:30 0.50 CASE P INT1 Stand back HWDP &DCs. -L/D Bumper Jars & TM. 07:30 - 08:00 0.50 CASE P INT1 Download MWD. 08:00 - 09:00 1.00 CASE P INT1 UD MWD tools, Float Sub, HWDP and Mills. -Gauge mills using 6 3/4" gauge ring. -Full gauge. 09;00 - 09:30 0.50 CASE P INT1 Clear Rig Floor of vendor tools. 09:30 - 10:00 0.50 CASE P INT1 Flush stack to clean out metal shavings from milling casing. -Function rams. -Flush stack again. 10:00 - 11:30 1.50 CASE P INT1 P/U & M/U 6 3/4" Bit, Motor, Float Sub, Stabilizers, MWD tools & one Non-Mag Flex DC. 11:30 - 12:00 0.50 CASE P INT1 Prep Nuke tools. 12:00 - 14:00 2.00 CASE P INT1 Upload MWD. -PJSM -Nuclear Sources. -Sperry Sun MWD load Nukes. -P/U 2 Non-Mag Flex DCs and HWDP. 14:00 - 15:00 1.00 CASE P INT1 RIH w/ Flex DCs. -L/D 4 3/4" Spiral DCs. 15:00 - 17:30 2.50 CASE P INT1 RIH w/HWDP & Drilling Jar. Continue to RIH w/ 4" DP f/ 395' to 6,849' md. 17:30 - 18:00 0.50 CASE P INT1 Orient to 14 degrees right of high side and run through window @ 6,871' md. 18:00 - 00:00 6.00 DRILL P PROD1 Directionally drill f/ 6,912' to 7,276' md. -P/U= 142K, SOW= 85K, Rot Wt.=105K. -240 gpm /off btm= 1410 psi, on btm= 1520 psi. -Tq off= 5K, Tq on= 5-6K. -AST= 1.31, ART= .94, ADT= 2.25. 12/12/2007 00:00 - 12:00 12.00 DRILL P PROD1 Directionally Drilling ahead f/ 7,276' to 7,784' md. -On connection @ 7,358' md, packing off was noted. -P/U= 145K, SOW= 75K, Rot Wt= 100K. -245 gpm / psi off= 1500, psi on= 1660. -60 rpm / Tq off= 5K, Tq on= 7K. WOB= 5-15K. -AST= 3.05, ART= 1.83, ADT= 4.88. 12:00 - 16:00 4.00 DRILL P PROD1 Directionally Drill ahead f/ 7,784' and to 8,086' md. -P/U= 150K, SOW= 75, Rot Wt= 102K. -250 gpm / psi off= 1610, psi on= 1720. -60 rpm / Tq off= 5K, Tq on= 7K. W06= 4-7K. -AST= .28, ART= 2.13, ADT= 2.41. 16:00 - 18:00 2.00 DRILL P PROD1 Pump Hi-Vis Sweep & CBU x 3+. -Good Sweep. -10% increase in cuttings. -250 gpm / 1600 psi. 100 rpm. -Reciprocate Drill String one std. -Mud Wt In= 9.0 ppg, Mud Wt Out= 9.0+ ppg. 18:00 - 20:00 2.00 DRILL P PROD1 POH on Elevators f/ 8,086' to 6,849' md. -P/U= 150K. Max overpull= 15K. -No drag noted pulling through window. Printed: 1/7/2008 3:36:39 PM i a $P AMERICA Page 10 of 14 Operatiolns Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/12/2007 20:00 - 22:00 2.00 DRILL P PROD1 Flow Check Well. -Static. -Drop ball. Circ sub opened @ 2200 psi. -CBU x 3+. --10% increase in cuttings. -400 gpm / 1500 psi. -60 rpm / Tq=SK. -Reciprocate Drill String one std. 22:00 - 00:00 2.00 DRILL P PROD1 Pump KCI Dry Job. -Blow down Top Drive. -Flow Check Well. -Static. -POH f/ 6,849' to 1,247' md. -Mud Wt In= 9.0 ppg, Mud Wt Out= 9.0+ ppg. 12/13/2007 00:00 - 00:30 0.50 DRILL P PROD1 POH f/ 1,247' to 395' and (BHA). -Flow Check Well. -Static. 00:30 - 01:00 0.50 DRILL P PROD1 Stand back HWDP, Jars, Non-Mag Flex DCs. -L/D Circ Sub. 01:00 - 03:30 2.50 DRILL P PROD1 PJSM- Handling Nuclear Sources. -Pull Nukes. -Download MWD. -L/D Telemetry tool. -Stand Back MWD. -L/D Stabilizer, Float Sub, Motor & Bit. 03:30 - 04:30 1.00 DRILL P PROD1 P/U & M/U PDC Bit, 1.5 degree bent Motor, Float Sub, ~ Stabilizer, MWD, PWD & Telemetry tool. 04:30 - 06:30 2.00 DRILL P PROD1 Upload & Shallow Test MWD. -Install Nukes. 06:30 - 07:00 0.50 DRILL P PROD1 RIH w/ DCs. -M/U Circ Sub, HWDP & Jars to 406' md. 07:00 - 09:00 2.00 DRILL P PROD1 RIH w/ 4" HT-38 DP f/ 406' to 6,860' md. -Fill pipe every 25 stds. 09:00 - 10:30 1.50 DRILL P PROD1 Cut & Slip Drilling Line. -Service Top Drive. 10:30 - 12:00 1.50 DRILL P PROD1 Orient 14 degrees right of High Side and Exit Window. -No drag noted while going through window. -RIH w/ 4' HT-38 DP to 7,993' md. i -Wash last stand to bottom (8,086' md). 12:00 - 00:00 12.00 DRILL P PROD1 Directionally Drill Ahead f/ 8,086' to 8,926' md. -P/U= 150K, SOW= 70K, Rot Wt= 100K. -250 gpm / psi off= 1610, psi on= 1770. -80 rpm / Tq off= 6K, Tq on= 7K. WOB= 3. -AST= 1.58, ART= 4.30, ADT= 5.88. -Pump 40 bbl Hi-Vis Sweeps @ 8,486' md, 8,880' md, & 8,921' md. -5% increase in cuttings w/ first sweep. -10% increase in cuttings w/ second sweep. -3% increase in cuttings w/ third sweep. 12/14/2007 00:00 - 12:00 12.00 DRILL P PROD1 Directionally Drilling Ahead f/ 8,926' and to 9,707' md. -P/U= 130K, SOW= 75K, Rot Wt= 100K. - 245 gpm / psi off= 1770, psi on= 1940. - 80 rpm / Tq off= 4K, Tq on= 5K. W06= 3K. -AST= 1.29, ART= 4.12, ADT= 5.41. -40 bbl Hi Vis/ Nut Plug Sweep pumped @ 9,335' md. -No increase in cuttings observed. 12:00 - 00:00 12.00 DRILL P PROD1 Directionally Drill Ahead f/ 9,707' to 10,428' md. Printed: 1/7/2008 3:36:39 PM BP AMERICA Page 11 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date: From - To Hours Task £ode NPT Phase Description of Operations 12/14/2007 12:00 - 00:00 12.00 DRILL P PROD1 -P/U= 125K, SOW= 75K, Rot Wt= 100K. - 245 gpm / psi off= 1770, psi on= 1940. - 80 rpm / Tq off= 5K, Tq on= 5K. W06= 3K. -AST= 3.80, ART= 1.34, ADT= 5.14. -40 bbl Hi Vis /Nut Plug Sweep pumped @ 10,239' md. -No increase in cuttings observed. 12/15/2007 00:00 - 06:00 6.00 DRILL P PROD1 Directionally Drill Ahead f/ 10,428' to TD @ 10,780' md. / 4,189' tvd. -P/U= 125K, SOW= 75K, Rot Wt= 100K. -250 gpm / psi off= 1820, psi on= 2080. -80 rpm / Tq off= 4K, Tq on= 5K. W06= 5K -AST= .58, ART= 2.36, ADT= 2.94. -Pump 40 bbl Hi-Vis/ Nut Plug Sweep @ 10,679' md. -5% increase in cuttings observed. 06:00 - 09:00 3.00 DRILL P PROD1 Pump 40 bbl Hi-Vis /Nut Plug Sweep surface to surface. -Slight increase in cuttings observed. -CBU x 3. -250 gpm / 1970 psi. -Rotate @ 120 rpm & Reciprocate 1 std. -Flow Check well. -Static. 09:00 - 12:00 3.00 DRILL P PROD1 Back Ream & Mad Pass @ 300' per hour f/ 10,780' to 10,086' md. -245 gpm / 1750 psi. -100 rpm / Tq= 5K. 12:00 - 00:00 12.00 DRILL P PROD1 Back Ream & Mad Pass @ 300' per hr f/ 10,086' to 7,909' md. -245 gpm / 1520 psi. -100 rpm / Tq= 4K. 12/16/2007 00:00 - 04:30 4.50 DRILL P PROD1 Mad Pass f/ 7,909' to 6,956' md. -Pull thru window. -No overpull noted thru window. 04:30 - 05:00 0,50 DRILL P PROD1 CBU above window @ 6,860' md. -At BU, 50% reduction in cuttings on the shakers. -250 gpm / 1470 psi. -Rotate 40 rpm & Reciprocate. 05:00 - 07:00 2,00 DRILL P PROD1 RIH thru window. -No drag noted thru window. -RIH f/ 6,956' to 10,780' md. -Fill every 20 stds. -Wash last std to bottom. 07:00 - 09:30 2.50 DRILL P PROD1 Pump 40 bbl Hi-Vis Sweep. -No increase in cuttings observed from sweep. -CBU x 3. -300 gpm / 2490 psi. -Rotate @ 120 rpm & Reciprocate 1 std. -Flow Check Well. -Static. -Obtain parameters: P/U= 125K, SOW= 85, Rot Wt.= 104K. Tq= 4K. 09:30 - 12:00 2.50 DRILL P PROD1 POH f/ 10,780' to 8,383' md. -Spot Liner Running Pill while POH. -85 gpm / 540 psi. 12:00 - 14:00 2.00 DRILL P PROD1 POH f/ 8,383' to 6,860' md. -Spot Liner Running Pill while POH. -85 gpm / 500 psi. Printed: 1/7/2008 3:36:39 PM BP AMERLCq Page 12 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours .Task Code NPT Phase Description of Operations 12/16/2007 14:00 - 15:00 1.00 DRILL P PROD1 Flow Check Well. -Static. 15:00 - 17:30 I 2.501 DRILL I P 17:30 - 21:30 I 4.001 DRILL I P 21:30 - 22:00 0.501 DRILL I P 22:00 - 22:30 0.50 BOPSU P 22:30 - 23:00 I 0.501 BOPSUFd P 23:00 - 00:00 I 1.001 BOPSURP 12/17/2007 100:00 - 03:30 I 3.501 BOPSUf{P 03:30 - 04:30 I 1.001 BOPSUf~ P 04:30 - 10:30 I 6.001 CASE I P 10:30 - 12:00 I 1.501 CASE I P 12:00 - 14:00 I 2.00 I CASE I P -Drop ball and open Circ Sub. -400 gpm / 1050 psi. -Rotate @ 40 rpm / Tq= 2-3K. -Flow Check Well. -Static. -Pump Dry Job. -Blow Down Top Drive. PROD1 POH f/ 6,860' to 406' md. -Flow Check Well. -Static. PROD1 Rack back HWDP. -L/D 2 Non-Mag DCs. -PJSM -Nuclear Sources. -Pull Nukes. -Download MWD. -L/D Non-Mag DC, MWD tools, Stabilizer, Float Sub, Motor & Bit. PROD1 Clear Rig floor of BHA. -Drain BOP Stack. PROD1 Pull wear ring. -Set Test plug. PROD1 R/U all BOP test equipment. -Fill all necessary lines and Choke. PROD1 PJSM -BOP testing. -Test Annular, HCR Kill & Choke, Top Rams, Choke Valves # 1,12, 13, 14 & IBOP valves. -Test using AOGCC & BP regulations & procedures. -All tests 250 psi low / 3500 psi high. -All tests held for 5 minutes & charted. -Test witnessed by WSL &Tourpusher. -John Crisp, AOGCC, waived witness of the test. PROD1 Continue BOP Test. -Test using AOGCC & BP regulations & procedures. -All tests 250 psi low / 3500 psi high. -All tests held for 5 minutes & charted. -Test witnessed by WSL &Tourpusher. -John Crisp, AOGCC, waived witness of the test. -Good Test. PROD1 R/D BOP test equipment. -Install Wear ring. -Blow down Choke manifold and Kill line. RUNPRD PJSM -Running Liners. -R/U tongs & equipment for Liner. -Run 4 1/2" 12.6# L-80 IBT-M Slotted liner assembly to 4,098' md. -Run 78 Volant centralizers. -1 centralizer per jt of slotted liner except jts #1 & 2. RUNPRD P/U 4 1/2" Liner/ Hanger/ Packer. -RIH on 4" DP f/ 4,098' md. to Top of Window @ 6,871' md. -Record P/U & SOW every 10 stds. -P/U= 111 K, SOW= 93K @ window. RUNPRD Continue RIH on 4" DP f/ 6,871' to 10,780' md. -No drag noted thru window. -Record P/U & SOW every 10 stds. Printed: 1/7/2008 3:36:39 PM • BP AMERICA Page 13 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT -Phase Description of Operations 12/17/2007 12:00 - 14:00 2,00 CASE P RUNPRD -P/U= 128K, SOW= 90K @ TD. 14:00 - 16:30 2.50 CASE P RUNPRD Tag bottom. -Drop 1 3/4" ball and pump onto seat. -89 gpm / 380 psi. -Set Liner Hanger by setting down 30K. -Pressure up to 4,000 psi to set Liner Packer. -Set down 35K to verify Packer engagement. -Pressure test liner to 2,000 psi. Chart & hold for 30 min. -Good test. -Shoe is @ 10,778' md. Top of Packer is @ 6,700' md. 16:30 - 18:00 1.50 CASE P RUNPRD Clear Rig Floor. -Blow down Top Drive & Choke & Kill lines. -Bring 4" DP thread protectors to Rig Floor. 18:00 - 20:00 2.00 CASE P RUNPRD PJSM -Displacing Fluids in Well. -Rack back 1 std of 4" DP. - Pump two 40 bbl spacers. -Spacer #1 - Hi Vis / SafeKleen Brine. -Spacer #2 - Hi Vis Brine. -Chase w/ 388 bbls of 9.3 ppg Brine. -Ensure clean brine from Top of Packer to Surface. -270 gpm / 1270 psi. -Flow Check Well. -Static. -Blow Down Top Drive. 20:00 - 23:30 3.50 CASE P RUNPRD PJSM -Laying Down DP. - POH & L/D 4" to pipe shed f/ 6,700' to 2,500' md. 23:30 - 00:00 0.50 CASE P RUNPRD RIH w/ 4" DP remaining in the Derrick f/ 2,500' to 3,900' md. 12/18/2007 00:00 - 01:30 1.50 CASE P RUNPRD RIH w/ 4" DP from Derrick. -3,900' to 6,600' md. 01:30 - 03:00 1.50 CASE P RUNPRD PJSM -Slip & Cut Drilling Line -Slip & Cut Drilling Line. -Service Top Drive. -Pump Brine thru 4" DP. 03:00 - 08:00 5.00 CASE P RUNPRD L/D 4" DP to Pipe Shed f/ 6,600' md. to BHA. 08:00 - 08:30 0.50 CASE P RUNPRD Service brake and LD baker tools 08:30 - 09:30 1.00 CASE P RUNPRD RIH and LD remaining HWDP and jars -Pull wear bushing - Clear rig floor 09:30 - 12:00 2.50 RUNCO RUNCMP PJSM - RU to run tubing w/ ESP completion equipment 12:00 - 16:00 4.00 RUNCO RUNCMP PJSM - MU ESP assy + 1 pup jt. Fill with oil. Pull cable to floor, hang shieve and tie into pump. Check connection. 16:00 - 00:00 8.00 RUNCO RUNCMP RIH w/ ESP completion on 2-7/8" 6.5# L-80 EUE 8Rd tubing 1 x 1 f/ pipe shed. Fill pipe every 2,000' and break circulation: @ 2,000' - 1 bpm / 320 psi ; @ 4,000' - 1 bpm / 510 psi. Check cable conductivity every 2,000' 12/19/2007 00:00 - 02:00 2.00 RUNCO RUNCMP Cont. RIH ESP completion on 2-7/8" 6.5# L-80 EUE 8Rd tubing 1 x 1 f/ pipe shed. Total jts run: 210. Install a total of 117 LaSalle Cast Cable Protectors. 02:00 - 07:00 5.00 RUNCO RUNCMP MU pump in sub and circulate 300 bbls clean 9.3 ppg brine down tubing - 1 bpm / 1,500 psi. 07:00 - 10:00 3.00 RUNCO RUNCMP MU landing hanger and landing jt -Cut ESP cable, prepare and connect to penetrator. Test 10:00 - 11:00 1.00 RUNCO RUNCMP Land tubing hanger - RILDS - LD landing joint and install TWC. Printed: 1/7/2008 3:36:39 PM • BP AMERICA Page 14 of 14 Operations Summary .Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: ~ Contractor Name: DOYON DRILLING INC . Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date.. From - To Hours Task Code. • NPT Phase Description of Operations 12/19/2007 10:00 - 11:00 1.00 RUNCO RUNCMP Test f/ above to 1,000 psi x 10 min on chart Bottom of ESP assy @ 6,650' / X-Nipple @ 2,060' / GLM with dummy valve @ 202' PUW = 84k /SOW = 75k (Block wt = 50k) 11:00 - 11:30 0.50 RUNCO RUNCMP Blow down kill and choke lines - LD tongs and tubing equipment -Vac out stack 11:30 - 13:30 2.00 BOPSU P RUNCMP PJSM - ND BOP 13:30 - 16:00 2.50 WHSUR P RUNCMP NU tree -Tighten adapter flange and test to 5,000 psi x 10 min - Orient tree -Final tie in on ESP cable and test of conductivity. Tests good. 16:00 - 17:30 1.50 WHSUR P RUNCMP RU to test tree -Test tree w/ diesel to 3,500 psi x 10 min - RD testing equipment 17:30 - 18:30 1.00 WHSUR P RUNCMP RU DSM lubricator and test to 500 psi -Pull TWC - RD lubricator 18:30 - 22:00 3.50 WHSUR P RUNCMP RU Little Red and lines to IA and tubing -Test lines -Pump 95 bbls diesel down IA taking returns out tubing, 1 bpm / 750 - 850 psi (total returns of 39 bbls) -Bullhead 18 bbls of diesel down tubing, 1 bpm / 1,250 psi -Suck lines and RD Little Red 22:00 - 23:00 1.00 WHSUR P RUNCMP RU DSM lubricator and test to 500 psi -Install BPV - RD lubricator NOTE: 500 psi pressure on tubing before installing BPV 23:00 - 00:00 1.00 WHSUR P RUNCMP Secure well -Install gauges and check pressures -Release rig OA = 250 psi / IA = 400 psi / TBG = 0 psi D Printed: 1/7/2008 3:36:39 PM BP AMERICA Page 1 of 1 Leak-.Off Test Summary.. Legal Name: MPH-19 Common Name: MPH-19 .Test Date Test Type.. Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 12/4/2007 FIT 3,845.0 (ft) 2,919.0 (ft) 8.70 (ppg) 425 (psi) 1,744 (psi) 11.50 (ppg) u Printed: 1/7/2008 3:36:32 PM Sperry Drilling Services Survey Report Cpmpan~~: BP Amoco Date: 1/7/2008 Tiure: 15:16:07 Page: 1 Field: Mllne Point Co-ordinate('SHj Ref erence Well: MPH-19, True North Site: M Pt H Pad Vertical (TVl)) Refer ence: MPH-19: 70.0 ', 1~'cll: MPH-19 Section (VS) Referen ce: Well (O.OON,O.OOE,75.14Azi) ~y'cllpath: MPH-19 Sur~~cy Calculatiun;~ ~lethod: Mi nimum Curvature Db: Or2cle Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Well: MPH-19 Slot Name: 5002923371 Well Position: +N/-S 1124.53 ft Northing: 6010104.59 ft Latitude: 70 26 17.724 N +E/-W 1115.91 ft Easting : 556512.33 ft Longitude: 149 32 21.142 W Position Uncertainty: 0.00 ft Wellpath: MPH-19 Drilled From: Well Ref. Point 5002923371 00 Tie-on Depth: 34.10 ft Current Datum: MPH -19: Height 70.00 ft _ Above System Datum: Mean Sea Level Magnetic Data: 1 1 /28/2007 Declination: 23.12 deg Field Strength: 57636 nT Mag Dip Angle: 80.91 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direc tion ft ft ft deg 34.10 0.00 0.00 75.14 Survey Program for Definitive Wellpath Date: 1/4/2008 Validated: Yes Version: 14 Actual From To Survey Toolcode Tool Name ft ft 100.00 7578.48 MPH-19 MWD-IFR-MS Sperry (100. MWD+IFR+MS MWD +IFR + Multi Station Survey bID Lncl Azim TVll Sys TVD N/S I?/yV \iap~' 113ap1+: Tool ft deg deg ft ft ft ft ft ft 34.10 0.00 0.00 34.10 -35.90 0.00 0.00 6010104.59 . 556512.33 - TIE LINE 100.00 0.45 66.42 100.00 30.00 0.10 0.24 6010104.70 556512.57 MWD+IFR+MS 165.00 1.03 14.48 164.99 94.99 0.77 0.62 6010105.37 556512.94 MWD+IFR+MS 233.00 2.94 0.54 232.95 162.95 3.11 0.79 6010107.70 556513.09 MWD+IFR+MS 261.00 3.14 1.07 260.91 190.91 4.59 0.81 6010109.19 556513.10 MWD+IFR+MS 354.00 3.52 357.58 353.75 283.75 9.99 0.73 6010114.59 556512.99 MWD+IFR+MS 444.00 3.93 352.93 443.56 373.56 15.81 0.24 6010120.40 556512.45 MWD+IFR+MS 535.00 3.97 6.35 534.35 464.35 22.04 0.20 6010126.63 556512.37 MWD+IFR+MS 625.00 3.80 25.05 624.15 554.15 27.84 1.81 6010132.44 556513.93 MWD+IFR+MS 720.00 2.72 27.70 718.99 648.99 32.68 4.19 6010137.30 556516.27 MWD+IFR+MS 812.47 3.01 40.28 811.35 741.35 36.48 6.78 6010141.12 556518.83 MWD+IFR+MS 859.08 3.11 37.55 857.89 787.89 38.41 8.34 6010143.06 556520.38 MWD+IFR+MS 951.35 3.34 35.87 950.01 880.01 42.58 11.44 6010147.25 556523.45 MWD+IFR+MS 1045.79 3.79 41.45 1044.27 974.27 47.15 15.12 6010151.85 556527.09 MWD+IFR+MS 1140.75 4.39 41.68 1138.99 1068.99 52.21 19.62 6010156.95 556531.55 MWD+IFR+MS 1235.35 7.24 36.23 1233.09 1163.09 59.73 25.55 6010164.50 556537.42 MWD+IFR+MS 1330.36 10.72 35.57 1326.92 1256.92 71.75 34.23 6010176.59 556546.01 MWD+IFR+MS 1422.85 13.28 35.14 1417.39 1347.39 87.43 45.35 6010192.36 556557.01 MWD+IFR+MS 1518.48 13.36 35.34 1510.44 1440.44 105.43 58.06 6010210.45 556569.58 MWD+IFR+MS 1610.08 14.37 36.28 1599.37 1529.37 123.23 70.91 6010228.34 556582.30 MWD+IFR+MS 1696.05 18.94 30.19 1681.72 1611.72 143.90 84.25 6010249.11 556595.47 MWD+IFR+MS 1798.87 21.84 28.01 1778.09 1708.09 175.21 101.62 6010280.55 556612.61 MWD+IFR+MS 1894.54 22.02 29.28 1866.84 1796.84 206.57 118.75 6010312.03 556629.50 MWD+IFR+MS 1989.54 23.62 29.49 1954.40 1884.40 238.67 136.83 6010344.27 556647.34 MWD+IFR+MS 2084.97 27.53 32.00 2040.46 1970.46 274.03 157.94 6010379.78 556668.17 MWD+IFR+MS 2180.05 30.89 33.56 2123.44 2053.44 313.01 183.08 6010418.95 556693.02 MWD+IFR+MS 2273.97 35.30 34.67 2202.11 2132.11 355.44 211.86 6010461.59 556721.47 MWD+IFR+MS 2369.45 40.17 37.32 2277.60 2207.60 402.65 246.25 6010509.06 556755.49 MWD+IFR+MS 2464.18 43.93 37.23 2347.93 2277.93 453.13 284.67 6010559.82 556793.53 MWD+IFR+MS 2548.27 45.93 38.48 2407.46 2337.46 500.01 321.12 6010606.97 556829.62 MWD+IFR+MS • ~ • Sperry Drilling Services Survey Report _ - - - Company: BP Amoco Date 1/7/2008 Time: 15:16:07 Page: ' Field: Miln e Point Co-oid u~atctlvL)Rc l'crcuce: Well: MPH-19, True North Site M Pt H Pad F'crtr~a l ('IVY) Rete reoce: MPH -19: 70.0 b4cII: MP H-19 Section (VS1 Referc uce: Well (O.OON,O.OOE,75.14Azi) ~ticllpalh: MP H-19 Survec Calculation Method: Minim um Curvature Dh: Oracle Sure°e~~ I MD Iucl 1zim T~'D S}'s'fVll N/S L/~V MapN NIap1. Tool ', ft deg deg ft ft ft ft ft ft 2642.51 51.34 38.25 2469.72 2399.72 555.45 364.99 6010662.74 556873.07 MWD+IFR+MS 2745.71 56.79 38.55 2530.26 2460.26 620.91 416.88 6010728.58 556924.46 MWD+IFR+MS 2840.31 60.96 38.59 2579.15 2509.15 684.21 467.36 6010792.25 556974.45 MWD+IFR+MS 2935.31 64.50 38.04 2622.67 2552.67 750.46 519.70 6010858.89 557026.28 MWD+IFR+MS 3029.19 67.33 37.65 2660.98 2590.98 818.13 572.28 6010926.95 557078.33 MWD+IFR+MS 3122.27 67.60 36.65 2696.65 2626.65 886.66 624.19 6010995.86 557129.73 MWD+IFR+MS 3218.95 70.70 37.98 2731.06 2661.06 958.49 678.96 6011068.11 557183.94 MWD+IFR+MS 3313.36 70.89 38.38 2762.11 2692.11 1028.58 734.07 6011138.60 557238.52 MWD+IFR+MS 3407.44 70.50 38.89 2793.22 2723.22 1097.93 789.51 6011208.37 557293.42 MWD+IFR+MS 3502.99 70.50 38.90 2825.11 2755.11 1168.03 846.06 6011278.89 557349.44 MWD+IFR+MS 3598.35 70.94 37.47 2856.60 2786.60 1238.78 901.71 6011350.05 557404.54 MWD+IFR+MS 3691.80 70.81 37.66 2887.22 2817.22 1308.77 955.53 6011420.44 557457.83 MWD+IFR+MS 3775.42 70.36 37.75 2915.01 2845.01 1371.17 1003.77 6011483.19 557505.58 MWD+IFR+MS 3833.42 69.49 38.57 2934.92 2864.92 1414.00 1037.42 6011526.27 557538.91 MWD+IFR+MS 3925.75 67.99 38.12 2968.40 2898.40 1481.48 1090.81 6011594.15 557591.77 MWD+IFR+MS 4020.71 69.64 39.38 3002.72 2932.72 1550.53 1146.23 6011663.61 557646.67 MWD+IFR+MS 4115.68 69.30 39.23 3036.02 2966.02 1619.35 1202.57 6011732.85 557702.48 MWD+IFR+MS 4208.85 67.57 44.24 3070.28 3000.28 1683.99 1260.20 6011797.92 557759.62 MWD+IFR+MS 4304.47 66.18 44.08 3107.84 3037.84 1747.08 1321.47 6011861.46 557820.39 MWD+IFR+MS 4398.97 65.25 46.78 3146.71 3076.71 1807.52 1382.82 6011922.36 557881.28 MWD+IFR+MS 4493.48 64.65 49.80 3186.73 3116.73 1864.49 1446.72 6011979.80 557944.74 MWD+IFR+MS 4584.70 63.78 54.71 3226.43 3156.43 1914.75 1511.63 6012030.56 558009.27 MWD+IFR+MS 4678.83 62.13 58.61 3269.24 3199.24 1960.83 1581.64 6012077.16 558078.91 MWD+IFR+MS 4774.85 62.89 63.19 3313.58 3243.58 2002.23 1656.04 6012119.12 558152.99 MWD+IFR+MS 4869.67 64.95 66.84 3355.28 3285.28 2038.17 1733.23 6012155.64 558229.90 MWD+IFR+MS 4963.92 64.64 70.72 3395.43 3325.43 2069.04 1812.70 6012187.10 558309.12 MWD+IFR+MS 5058.25 65.83 76.31 3434.97 3364.97 2093.31 1894.79 6012211.99 558391.02 MWD+IFR+MS 5152.55 65.31 80.60 3473.98 3403.98 2110.49 1978.89 6012229.81 558474.98 MWD+IFR+MS 5248.11 65.99 84.96 3513.40 3443.40 2121.42 2065.23 6012241.40 558561.22 MWD+IFR+MS 5344.07 65.67 89.32 3552.71 3482.71 2125.79 2152.64 6012246.43 558648.59 MWD+IFR+MS 5439.55 64.95 92.86 3592.60 3522.60 2124.15 2239.35 6012245.44 558735.31 MWD+IFR+MS 5533.08 65.36 97.07 3631.91 3561.91 2116.80 2323.88 6012238.74 558819.88 MWD+IFR+MS 5624.13 64.85 101.80 3670.26 3600.26 2103.28 2405.32 6012225.83 558901.42 MWD+IFR+MS 5719.70 64:98 105.32 3710.79 3640.79 2082.98 2489.45 6012206.18 558985.68 MWD+IFR+MS 5813.96 65.88 109.64 3749.99 3679.99 2057.23 2571.19 6012181.05 559067.60 MWD+IFR+MS 5908.51 66.32 112.55 3788.31 3718.31 2026.12 2651.82 6012150.55 559148.47 MWD+IFR+MS 6002.66 68.45 117.16 3824.53 3754.53 1989.58 2730.64 6012114.61 559227.55 MWD+IFR+MS 6105.86 69.10 121.21 3861.90 3791.90 1942.68 2814.60 6012068.35 559311.86 MWD+IFR+MS 6198.37 67.63 125.32 3896.02 3826.02 1895.54 2886.49 6012021.76 559384.09 MWD+IFR+MS 6295.36 68.49 127.79 3932.26 3862.26 1841.95 2958.75 6011968.73 559456.75 MWD+IFR+MS 6389.07 65.51 128.14 3968.88 3898.88 1788.90 3026.75 6011916.20 559525.14 MWD+IFR+MS 6484.16 64.99 129.06 4008.69 3938.69 1735.02 3094.23 6011862.84 559593.03 MWD+IFR+MS 6578.19 68.33 127.14 4045.94 3975.94 1681.78 3162.17 6011810.12 559661.36 MWD+IFR+MS 6672.95 68.28 126.62 4080.97 4010.97 1628.94 3232.60 6011757.82 559732.18 MWD+IFR+MS 6766.48 68.09 127.55 4115.72 4045.72 1576.58 3301.87 6011705.99 559801.84 MWD+IFR+MS 6858.76 71.20 126.41 4147.82 4077.82 1524.55 3370.98 6011654.49 559871.34 MWD+IFR+MS 6954.53 75.46 127.60 4175.29 4105.29 1469.33 3444.22 6011599.84 559944.99 MWD+IFR+MS 7048.46 82.13 129.23 4193.53 4123.53 1412.11 3516.36 6011543.16 560017.55 MWD+IFR+MS 7144.24 86.80 130.12 4202.77 4132.77 1351.26 3589.72 6011482.88 560091.36 MWD+IFR+MS 7239.16 87.42 129.52 4207.55 4137.55 1290.55 3662.53 6011422.73 560164.62 MWD+IFR+MS 7332.94 83.67 129.48 4214.83 4144.83 1231.09 3734.66 6011363.82 560237.19 MWD+IFR+MS 7429.47 80.40 128.02 4228.21 4158.21 1171.26 3809.20 6011304.57 560312.18 MWD+IFR+MS A Sperry Drilling Services Survey Report ~ Compan~~: BP AmoCO Date: 1/7/2008 'l'ime: 15:16:07 Yage: 3 ~ 1~ield: Mllne Point Co-ordinate(NL:)Refcrence: Well: MPH-19, True North Site: M Pt H Pad Vertical ~CVDI ReYerencr. MPH-19: 70.0 Well: MPH-19 Section iVS) Reference: Well (O.OON,O.OOE,75.14Azi) SVellpath: MPH-19 Survey Calculation Method: Minimum Curvature Db: Oracle Survey - _ _ _ - _ MD Incl .1zim ___ _ -_ TVD Sv~s TVD ---- _ f I N/5 E/W Ma ~N NIa ~L Tool ~, ft deg deg ft ft ft ft ft ft 7522.50 79.94 131.90 4244.10 4174.10 1112.40 3879.45 6011246.25 560382.86 MWD+IFR+MS 7578.48 80.48 131.54 4253.62 4183.62 1075.69 3920.62 6011209.85 560424.31 MWD+IFR+MS 7620.00 80.48 131.54 4260.48. 4190.48 1048.53 3951.27 6011182.93 ~ 560455.16 ,PROJECTED to TD Q SARAH PALIN V GO ERNOR ~~ O~ ~ii~ ~ 333 W. 7th AVENUE, SUITE 100 C011TSE`RQA~'IO1Q CO1~~ISSIOIQ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Kara Senior Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPH-19 BP Exploration Alaska, Inc. Permit No: 207-136 Surface Location: 2954' FSL, 4132' FEL, SEC. 34, T13N, R10E Bottomhole Location: 3495' FSL, 5231' FEL, SEC. 35, T13N, RlOE, UM Dear Mr. Kara: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 6507 (pager). DATED this day of .October, 2007 cc: Department of Fish & Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA Gtr ~ ~~~ f~;, ,,_ ~__,_ ALAS~IL AND GAS CONSERVATION COMMON ~01t1 PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ® Drill ^ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: MPH-19 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 8177 TVD 4260 12. Field /Pool(s): Milne Point Unit / Schrader Bluff 4a. Location of Well (Governmental Section): Surface: 2954' FSL 4132' FEL SEC 34 T13N R10E 7. Property Designation: ADL 025518 ~ , , . , , , (gsPlanned) Top of Productive Horizon: 4301' FSL, 506' FEL, SEC. 34, T13N, R10E, UM - 8. Land Use Permit: 13. Approximate Spud Date: November 1, 2007 Total Depth: 3495' FSL, 5231' FEL, SEC. 35, T13N, R10E, UM - 9. Acres in Property: 2560 14. Distance to Nearest Property: 4570' 4b. Location of Well (State Base Plane Coordinates): Surface: x-556512 y-6010105 Zone-ASP4 10. KB Elevation Planned (Height above GL): 71~ feet 15. Distance to Nearest Well Within Pool: 150' from MPH-13 16. Deviated Wells: Kickoff Depth: 750 feet Maximum Hole An le: 84 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1728 Surface: 1330 18. CasiR Pr ram: ` S cifications To - Settin De th -Bo ttom Quanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD ND MD ND includin sta a data 42" 20" 92# H-40 Weld 112' Surface Surface 112' 112' 260 sx Arctic Set A rox. 13-1/2" 10-3/4" 45.5# L-80 BTC 3817' Surface Surface 3817' 2920' 574 sx Dee Crete 247 sx LiteCrete 9-7/8" 7-5/8" 29.7# L-80 am Top/BTC-M 177' urfa a Surface 8177' 4260' 815 sx Class'G' 19. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill'and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing° Length Size Cement Volume - MD- TVD Conductor /Structural Surface Intermediate Produ ti n Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Paul Hanson, 564-4195 Printed Name Dan Kira Title Senior Drilling Engineer _,_ _, , Prepared By Name/Number: Si nature t ,~ ~ ~ ` ~`-~" Phone 564-5667 Date 1 ~= ~'~ C1 Sondra Stewman, 564-4750 Commission Use Onl Permit To Drill Number: ~?O~/.~ O API Number: 50- Oo?9 ~° ~3~IODOO Permit Approval See cover letter for Date: other re uirements Conditions of Approval: c~ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: C I Samples Req'd: ^ Yes Mud Log Req'd: ^JYes ~No HZS Measures: ^ No irecti al Survey Req'd: L10 Yes ^ No Other: 3SOOQS~~~P-tres~csS ~k''~~ Date ~D~~'' d~ APPROVED BY THE COMMISSION COMMISSIONER Form 10-401 Revised 12/2005 p R 1 G I N A L ~~~. " Cate by °~ October 1st, 2007 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7t1' Avenue, Suite 100 Anchorage, AK 99501 Re: Request for Permit to Drill and Complete MPH-19 and MPH-19L 1. Mr. Maunder: Doyon 14 is presently scheduled to spud MPH-19 on November 1±. As is detailed in this permit application package, the plan is to drill 13-1/2" surface to 3817' MD/2920' TVD and set 10-3/4" 45.5#, dri119-7/8" hole to 8177' MD with ~ 180' of rathole below the base of the Schrader Bluff OB Sand and set 7-5/8" 29.7#. Prior to running the 7-5/8" casing we will conduct pressure sampling operations over the Schrader Bluff interval. This will be the main or "mother" wellbore MPH-19. After running the 7-5/8" casing and cementing to above the TUZC, we will run a USTT to confirm good cement and set a packer and seal-bore assembly below the OA sand interval to allow future CTD access to the OB Sands. After setting a whipstock and milling a window in the 7-5/8" casing we will drill approximately 3700' of 6-3/4" OA lateral -depending on sand quality. This will be MPH-I9LI. A combination of 4-/12" slotted and blank liner and possible swell packers will be run on a hook-wall hanger into the lateral, and the well will be completed with 2-7/8" tubing and an ESP. The attached information package details our plans. If I can provide any additional information, please contact me @ 564-4195 Sincerely, Paul Hanso Drilling Engineer BPXA /ACT 1 Milne Point Well MPH-19 Schrader OA Horizontal Producer Drilling and Completion Plan Summary II: I ceder Bluff OA Horizontal Producer Surface Location: 2,954' FSL and 4,131' FEL (As Planned) Section 34, T13N, R10E UM E = 556,512.44' N = 6,010,105.0' T ~~ 5 ~ 9-7/8" Hole: Top OA (main bore 4.301 FSL and 506' FEL MPH-19) Section 34, T13N, R10E UM E = 560124.78 N = 6011480.07 Z = 4,150.90' TVD 9-7/8" Hole Top OB (main bore 3,869' FSL and 106' FEL MPH-19) Section 34, T13N, R10E UM E = 560528.63' N = 6011051.23' Z = 4,215.90' TVD 9-7/8" Hole TD (main bore 3,495' FSL and 5,230` FEL MPH-19) Section 35, T13N, R10E UM E = 560687.51' N = 6010677.87' Z = 4,260.30' TVD 6-3/4" OA Lateral (TD of Lateral 758' FSL and 760' FEL MPH-19L1) Section 34, T13N, R10E UM E = 559905.00' N = 6007935.00' Z = 4,175.90' TVD Distance to Pro ert line 4570' Distance to nearest well 150' from MPH-13 ~ Estimated Start Date: 11" November, 2007 ~ n Wellbore MPH-19 TMD: 8,177 TVD: 4,260 Max Inc: 84° KOP: 750' KBE: 71' Well Desi n: Main wellbore set up for ossible future CTD OB Lateral Ob'ective: Schrader Bluff OA Lateral MPH-19L1 TMD: 10,974' TVD: 4,176 Max Inc: 90.7 KOP: 750' KBE: 71' Well Desi n: OA Horizontal Producer w/main wellbore set u for CTD OB Lateral Ob'ective: Schrader Bluff OA, with ossible future OB Lateral Maximum antici ated BHP: 1728 psi at 3,980' TVDss (NA Sand) Maximum surface ressure: 1330 psi (Based on a full column of gas at 0.1 psi/ft) Planned BOP Test ressure: 3500 psi 1 t Mud Program 13-1/2" Surface Hole (0 - 3.817'1: MPH-19 Snud Densit PV YP API FL H 8.6 - 9.4 10 - 25 30-50 NC-8 8.5 - 9.5 9-7/8" Intermediate Hole (3.817' - 8.177'): MPH-19 LSND MD Densit PV YP H API Filtrate MBT 3817-6638' 8.8-9.5 8-20 18-26 9.0-10.0 6-8 <25 6638'-8177' 9.5 14-20 18-26 9.0-10.0 6-8 <25 6-3/4" Production Hole (7.171' -10.974'1: MPH-19L1 Flo-Pro NT MD Densit PV YP H API Filtrate MBT 7171'-10974' 9.0-9.3 10-16 22-28 9.0-9.5 6-8 <6 Casing/Tubing Program Hole Size Casin g Size Wt/Ft Grad e Conn Length Top MD Top TVD Bottom MD Bottom TVD 42 20* 92 H-40 Weld 112 0 0 112 112 13.5 10.75 45.5 L-80 BTC 3817 0 0 3817 2920 9.875 7.625 29.7 L-80 VAM TOP 7000 0 0 7000 4133 9.875 7.625 29.7 L-80 BTC-M 1177 7000 4133 8177 4260 MPH-19L1 -80 I BT Slotted/blank 3803 7171 151 109 41 - 2.875 6.5 L-80 EUE 8rd 6500 0 0 6500 4000 * Pre-set Cement Program Casin Size 10-3/4"45.5 Ib/ft L-80 BTC Surface Casin Lead Slurry to surface. Excess 150% over gauge hole in PF, 40% Basis Excess in the remainder of the open hole. To of tail cement 1000' MD above Casin shoe. Total Cement Wash 15-bbl water Volume: 513 bbl S acer 75-bbl 10.1-Ib/ al un-viscosified Mud ush I I Sacer Lead 394 -Bbl, 574 sx of 10.7 Dee Crete - 3.85 ft /sx Tail 99-bbl, 247-sx 12.5 Ib/ al LiteCrete - 2.24ft /sx Tema ~60° F 2 Casin Size 7-5/8", 29.7#, L-80, VAM TOP/BTC-M Production Casin Basis Tail cement = 500' MD above the TUZC. 40% excess over au a hole. Total Cement Volume: 146.0 bbl Wash 5 bbl water 10 bbl CW 100 S acer 50 bbl of MudPush Tail 167.0 bbl, 815 sx `G' mixed at 15.8 Ib/ al & 1.16 ft /sx Tem BHST =80°F from SOR Evaluation Program 13-1/2" Section Open Hole: . DIR/GR/RES • InSite • Gyro surveys to depth beyond magnetic interference 9-7/8" Section Open Hole: DIR/GR/RES • NEU/DEN/GeoTap • IFR/CASANDRA • InSite Cased Hole: GR/USIT/CCL PDC mode 6-3/4" Section Open Hole: DIR/GR/RES • NEU/DEN • IFR/CASANDRA • InSite Formation Markers Formation Tops TMD (ft) TVDss (ft) BHP (psi) Surface Pressure as at 0.1 sift EMW (Ib/gal) BPRF 1851 1750 760 585 8.4 TUZC 5638 3610 1567 1206 8.4 U nu-MA 5744 3655 1587 1221 8.4 U nu-MB1 6059 3780 1641 1263 8.4 U nu-MB2 6184 3825 1661 1279 8.4 U nu-MC 6257 3850 1672 1287 8.4 ' SBF2-NA 6637 3980 1728 1330 8.4 SBF1-NB 6732 4010 1043 642 5.0 Fault 70' DTNW 6855 4040 TSBD-To OA 7170 4080 1485 1077 7.0 TSBC-Base OA 7496 4115 1498 1087 7.0 TSBB-To OB 7767 4145 1509 1095 7.0 SBA5 -Base OB 7995 4170 1518 1101 7.0 mmended "rogram Hole Size Depth (TMD) Footage Bit Type TFA GPM 13-1/2 0-3,817' 3,817 Hughes MXC1 .70-.90 450-650 9-7/8 3'817' - 8,177' 4,360' Hughes Christensen MXL-1 X Unless RSS .50-.70 500-600 6-3/4 7,171' - 10,974' 3,662' Hycalog DTX613M .40-.50 200-300 Well Control Intermediate Hole • Diverter to be rigged up and tested on surface • Maximum anticipated BHP: 1,728 psi at 3,980' TVDss (NB Sand) • Maximum surface pressure: 1330 psi (Based on a full column of gas at 0.1 psi/ft) • Planned BOP test pressure: 3,500 psi • BOP Test Frequency: Every 14 days maximum. • Integrity tests: FIT to 11.5 Ib/gal 20' below the 10-3/4" shoe. • Kick tolerance: 51 bbls with 9.4 Ib/gat mud at the 10-3/4" shoe. • No FIT planned for the OA lateral • Planned completion fluid: Kill weight brine (9.3 ppg) with diesel cap. 4 Drilling Hazards & Contingencies • Running gravel and heavy clay problems have been encountered on some H-Pad wells • Gas Hydrates have been reported on all H-Pad wells except one. The expected depth-range for encountering hydrates is 2,000' TVDss to 2,500' TVDss. Keep the mud as cool as possible while drilling by diluting with cold lake water. For cementing across this interval we will use low heat-of-hydration DeepCrete/LiteCrete Lost Circulation • Lost circulation is possible if elevated mud density is required for shallow gas or hydrate control. Expected Pressures • Pressures are expected to be 8.4 ppg or less. The NB sands are expected to be relatively depleted (5.0 ppg EMW), as are the Schrader Bluff Sands (7.0 ppg EMW). Pad Data Sheet • Please Read the H-Pad Data Sheet thoroughly. Hydrocarbons • Hydrocarbons are possible in the Ugnu & Schrader Bluff intervals. Gas-cut mud has been observed in the Schrader Bluff. Faults • Afault-crossing is expected in the Schrader Bluff sands in the mother-bore. The OA lateral will be drilled after the fault crossing (faulting possible but not expected in the lateral). Hydrogen Sulfide • MPH Pad is not designated as an H2S Pad: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level MPH-14 < 2 ppm Jun-01 #2 Closest SHL Well H2S Level MPH-10 < 2 ppm Jun-01 #3 Closest SHL Well H2S Level MPH-13 < 2 ppm Jun-01 Max. Recorded H2S on Pad/Facility < 2 ppm Other Relevant H2S Data Last H2S data from 2001, Schrader wells typically have no H2S. I-pad data from Feb 2005 had 3.2 ppm at MPI-15 Anti-collision Issues The MPH-19 Mother-bore passes major risk with respect to all wells with the exception of MPH-14, which has been P&A'd. The close approach is at approximately 390'. MPH-19 is a replacement well for MPH-14. The MPH-1 'lateral passes major risk with respect to all wellbores except MPH-13 and MPH-13A, which will be minor risked, as MPH-13 is presently Distance to Nearest Property • MPH-19L1 is planned to be 4570' from the nearest Milne Point property line. Distance to Nearest Well Within Pool • MPH-19L1 is 150' from the nearest sand penetration (MPH-13, which is P&A'd). 5 Doyon 14 contingency plan in the event of using Divert line H-Pad • Doyon 14 rig will have a Mine Point radio and will have met with H-Pad operator(s) and informed them of the placement of their Divert Line, who in turn will inform ALL personnel who will be doing work on the pad. • This Divert Line will have to be run near LIVE lines. Production, Test and Injection, due to space constraints on the pad. • In the event of using Divert Line, Doyon rig will call Milne Point control room board operator and request an ESD of H-Pad. • Doyon rig will then call Milne Point radio and inform them of action taken and why. Milne Point radio will make an announcement of restricted access to H-Pad. • Control room board operator will notify E and S-Pad operators and then initiate ESD for the pad shutting down production from all wells and all injection as well. The control room operator will also cut off electrical power to the pad. • The control room will then shut in XV-5873A the perimeter gas injection valve for H-Pad. • The control room board operator will shut in water injection for S and H-Pads with the corresponding perimeter valve XV-5310. To make up for the loss of injection, board operator may have to divert water to B-50 injection well. • Doyon rig will then correspond with H-Pad operator about situation who will then account for all personnel under their authority and direct them to safe area. S-Pad operator will make required adjustments for loss of water injection. • H-Pad operator will then verify pad is in ESD mode and all wells and corresponding equipment did in fact shut in and ALL ESP's shut down. • In the event that any other rig/wireline unit etc. is also on the pad they will have to be notified of any such action. • Once situation has been rectified Doyon rig will the notify the H-Pad operator, the control room board operator and Milne Point radio so provisions can be made to bring the pad back on line. 6 ! ~ Procedure Summary Pre-Rig Operations 1. MPH-14 surface location has been properly abandoned and prepped. 2. MPH-19 20" Conductor has been installed. Drilling 1. MIRU. NU Diverter. 2. Function test Diverter, PU 5" drill pipe and BHA 3. Drill 13-1/2" Hole to 3817' MD/2920' TVD per directional plan. 4. Run and cement 10-3/4" casing. 5. ND diverter, install wellhead and NU/Test BOPE. 6. Drill 9-7/8" hole as per directional plan to 8177' MD/4260' TVD 0180' below base OB). 7. Circulate hole clean and conduct GeoTap pressure sampling if available, MDT otherwise per geos. 8. RIH and condition hole for running casing. POH 9. Run and cement 7-5/8" casing (displace cement with Flo-Pro). ~`~ 10. ~ Run gauge ring/junk basket to insure casing is clear for packer setting. 11. ~~ Run USIT across window location at from TD to ~ 6500' minimum to insure good cement Q at window and isolation above and below (window depth estimated to be 7171'±). 12. Set Seal-bore, liner hanger and packer assembly to provide future CTD access to OB sands. ~ 13. Set whipstock at top of OA and mill window in 7-5/8" casing. While milling, condition Flo- Pro for drilling reservoir section 14. Drill 6-3/4" OA lateral as per directional plan to 10,974' MD/4,176' TVD. ~,15. Retrieve whipstock. ~Q~?-~~ 16. Run 4-1/2" slotted liner (possibility of 4 swell packers with blank pipe to isolate water- swept zones) and hang off hook-wall in 7-5/8" casing. 17. Displace drilling fluid to kill weight brine. 18. Run 2-7/8" ESP completion. 19. Land tubing hanger and test. 20. ND BOPE. NU and test tree. 21. Freeze-protect. 22. RDMO. 7 ' ~~ BP EXPLORATION _ MP19-Mother-bore Field: Milne Point Schrader Bluff OA Horiz. Producer ENG: P. Hanson Pad: S-Pad (Main Wellbore for OA Lateral) RIG: Doyon 14 RKB: 70.9' DIR / LWD OH FORM DEPTH HOLE CASING Cement MWD LOGS MD TVD SIZE SPECS Slurry INFO 20" Conductor Wellhead Permafrost 92-Ib/ft H-40 FMC Gen 6 112' 112' 42 Welded, Insul 20" x 11" 5M 10.7 PP9 Surface DeepCrete DeepCrete over Csg (Pre-Set) 394 bbl LiteCrete designed 10-3/4" 574 sx to provide high 45.5 Ib/ft compressive Int. Yield 5210 psi strength at shoe Collapse 2480 psi and minimal Base Permafrost 1,851' 1,822' Drift - 9.794" fall-back to address surface casing Top of Tail 2,817' 2548' corrosion. 12.5 PP9 LiteCrete 99 bbl Casing Point 3,817' 2,921' 69.41° 13-1/2" 247 sx Intermediate Casing 0' - 7000': 7-5/8" Top of Cement 5138' 3455' 29.7 Ibs/ft DIR/GR/RES L-80, VAM TOP TUZC 5,639' 3,681' Int. Yield 6890 psi NEU/DEN Collapse 4790 psi MDT Drift - 6.75" IFR/CASANDRA Cement Slurrv 167 bbl, 815 sx InSite 7000' - 8177': 15.8 ppg Pump Tangent 70.0° 7-5/8" 1.17 ft3/sx (6197' - 6647') 29.7 Ibs/ft Top N sand 6,638' 4,051' L-80, BTC-M Int. Yield 6890 psi Collapse 4790 psi Drift - 6.75" Top OA sand 7,171' 4,151' Top OB sand 7,768' 4,216' Test Csg to 84° GR/USIT/CCL 3500 psi Casing Point 8,177' 4,260' 9-7/8" 500' above TUZC -50% of Burst 9/19/2007 MPH-19 Well Plan Schematic.xls Tree: 4-1/16" - 5M FMC MPH-19 Wellhead: 11" x 4.5" 5M Gel w/ 2-7/8" EUE 8rd Tubing Ha 'YY11~ 1~ " -9 L- er 4" CIW "H" BPV profile 20" x 34" insulated, 215 #1ft A-53 112` roposed ng. KB elev. = 70.9' (Doyon 14) rig. GL. elev.= 36.6' Camco 2-7/8" x 1" w/ BK-5 latch 200' MD sidepocket KGB-2 GLM 10 3/4" 45.5# L-80 BTC (Drift ID = 9.794, cap. _ .0961 bpf) 10 3/4" Super Seal II Float Shoe 3817` 2-7/8" 6.5# L-80 EUE 8rd tbg. (Drift ID =2.347, cap. _ .00578 bpf ~~ AVA sleeve 1 joint above ESP Window in 7-5/8" csg @ --7171' (estimated Top OA) Well angle @ window = 84° X-nipple at 2000` TVD, 2049' MD Inc. at 10 3/4" shoe 69.4° 70° tangent for pump from -6200 to 6650' MD 84° Max. Inc. in motherbore Centrilift ESP -6650'MD OA Lateral 4 1/2" Slotted Liner 12.6# L-80 IBT w/Swell Packers and blanks 6 3/4" Hole TD @ 10,974' MD Lower Assembly HMC Hanger w/ ZXP Packer and Tubing Tail 7 5/8" 29.7# L-80 Casing 0-7000':VAM TOP 7000-8177': BTC-M ( drift ID = 6.750", cap. = 0.0459 bpf) 8177' DATE 08/17/07 REV. BY I COMMENTS PMH ~ Proposed Completion 4-1/2" 12.5# L-80 IBT Tubing Til w/ X-nipple and WLEG MILNE POINT UNIT WELL MPH-19\~.I BP EXPLORATION (AK) COMPANY DE"FAILS bP BI' Amuza Iculation Mahud: Minmwm ('unaturc Ertur Systzm: ISC'\4:SA Swan Method: Tray Cylinder North Error Surface: Elliptical +Casine CASING UL•"MILS Nu. lVD MU Name Size I 182.90 182.90 20" 2U.000 2 2920.90 3817.32 10 3.4" 10.750 c c_ n ?000- ~ ~'. I - ~ , ' t j ~ I I . FORMA17ON'FOP DETAILS No. "TVDPaIh MDPath Ponnation I 182Q90 ISS126 BPRF 2 3680.90 56;8.22 lU7.C 3 3725.90 5743.61 Ugnu-MA 4 3850.90 6058.52 Uenu-MBI S 3895.90 6184.33 Ugnu-MB2 6 3920.90 625737 Ugnu-MC' 7 40SQ90 6637.47 SBF2-NA 8 3080.90 6732.11 SBFI-NB '. 9 31 10 90 6853.79 Fault - 70' DTNW` 10 4150.90 7170.18 TSBD-Top OA I I 4185.90 7496.13 TSBC-B.uc OA i 12 4215.90 7767.14 "fSBB=1bpO6 ~ 13 324090 7994.79 SBAS-BU,e OB REFERENCE INFORMATION SLUR\'EY PROGRAM Cu-ordinate IN L'I Refemnce: W'zll Centre: Plan MPH-19, True Nonh zpih Fm Uzpth'I'o Su nzyl'lan -foul Plan: MPH-Diumed Pbl Wp S.O ( Plan MPH- 19/Plan MI'H-19 PBI 1 \brucal (Illh Reterrncz: 3666E+33.30KB 7U.90 Sedum IA'Si Reference: Slut - IO.OON.O.OOEi 4311 1200.00 Pl anneJ: MPH-Diomzd Pbl AA'p rill ' CB-(TARO-SS ' Created By : Sperry Drilling Dale: 9/12/2007 Measure) Depth Reference: 36.66E+34.30KB 70.90 1011.U0 ti17G.7G Pl annzd: MPIi- Diomzd Pb l W p K.0 MW D+ IPR+MS Calculation Method: Minimwn Cunaturc WEL L DEl'AILS Na me +N:-S tE:-\1' Noshing Fasting Lat itude Longitude Slot PIan MPH-19 1114)11 1116.02 6010103.76 556511.4) 70°2G'17. 726N W9`3 P21.139W' N,A SECTI ON DETAILS Sec MD Inc Azi TVD rN/-S +@;.W DLeg TFace VSec Target I 34.30 U.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 750,00 0.00 0.00 7)090 0.00 0.00 0.00 0.00 0.00 3 1000.00 5.00 45.00 9)9.68 Z71 Z71 2.00 45.00 8.63 3 1676.59 20.00 30.00 1658.46 129.48 86.87 225 340.30 102.79 - 1747.85 21 A6 30.00 172590 15L57 99.63 2.75 0.00 118.28 6 1882.63 21.96 30.00 ISSO9U 19522 124.83 0.00 0.00 148.88 ' - - ~ - ~ ~ -- ~ ~ 7 3074.67 69.41 37.53 2659,6) 87U.12 604.14 4.00 9.5> 71Q92 - i ~ f - - ~ h 4149.14 69.41 37.53 3037.61 I GG7.77 1216.84 0.00 0.00 1421.03 _ ' I ~ ~ `) 6197.42 70.00 126.22 3900.39 1900.43 2868.81 4.00 108.41 3089.21 - ~ ! ~ ~ ~ IU 6447.42 7QOU 126 22 3985.9U 1761 61 3U58.33 090 0.00 32)9.32 MPH-19P61 TI i ~ + ~ ~ II 6647.42 70.00 126.22 4054.311 1651156 3209.91 0.(10 2711.00 339$.41 12 6997.42 8490 126.22 4132.84 1339.55 3484.3') 4.00 360.00 3641.76 . ~._ 13 7197.42 84.00 126.22 41$3.75 1332.02 3644.86 Quo O.UO 3785.79 _ __ - ~ ~ I ~ 14 8176.76 84.00 IG5.62 4260.311 i3L511 4I 79.70 4.00 92)4 4214.63 1__ If I I!'II 7 ~~ TARGET DETAIIS N;unr "fVU +N!-S +Ei-W Noshing Fasting Shape MPH-19P61'I'I 3985.90 1761.61 3058.33 6011889.33 55955794 Circle (Radius:lUO) MI'11-19 E'auh I 3181.90 1236.96 3092.40 Gu11375.Op i5yj95.U0 Pulygml h1PH-19PB1 T2 Rzv I 426030 531.50 4179.70 6010677.86 560687.>I Point Vertical Section at 82.62' [ I OOOft/inJ o o - I _ D y F- I I _ - . j N z y M. - ~ ^ rl rl v C .. ~ I f I ~ y e a ~ M a y - ~ ! i~ e = a ~ " = - - z r _ oo v a= _ - - _ >. ~ ~ _ - T- ~~ _ ~~ ._ _. - .__ J 0 ~ _.- `T .. I ~, . ... >o ~ -- a b ~ v. ~ I_ ~ a ~ ~ ~ a _ n ~ ,., ,., _ Y ~ I - - .-, m ~ . 5 - - y r, _ n o ,o -_ ~ ~ ~ - ~ ~ ~ I °~ ~ ~ ~ ' r 1 - t' ~ ~ - rye _ ~ . ~. _ __ _. __ a~ v, ,o '~ f.. , - '°. 2 ~ v v. 3 ~ ,., o o r'.yr ~. p _ O . i ~ - _ ' _ u. _ ~ '~ .~. _ j ¢ F r. A - r 3- ._ y 'a '. -- _ o Z _ ~ - ~ - ., a ~~ ~ .. v c. F ,~ ? - - - a r- ~rvh _~. o - ~ -_ 3 a _ .. ~ _ _ - _ c ~ _ Q .c o - _ I .. ~ v. O z M K~ : j y . w ~ ._ _ .. ., ,r -- _ m _ ~ ;, 2 . . . . , z 0 0 ~ .. _. ~ ~ a Oo v ~ -_- m "gym .^' N co? of-o W oov oooa<o~ooo oc ~ <re r.O ~ ~.~ Z a --_ _--{- _._ ~ -~- _._ ~- I _. o.. ..,vv 0000 „ 00000 m __ o00rir 0o oo coooo ~ Q ~~ -- ~ .. ~ 222 yy.- _ f - I~ ! - - _ ~ i ` J ~ONri rl0 RCR 00•TOT ~ 7 O v v Z G ~ ~ ._ _.. .___._ ..._.- . n _ ^ N - x y W 1' 2 .. 11 ~ rr _ =0~~~ ~ - - -rvr rr~n~e ' 'J r,-~ z O >. v v . v CC -__ ._ _.. ____. _ _.... _ .. _. _... _.... _ _. - _ Z - Nv h- N O O - x r rl N ry - ~ r = O -C`Y J=~ / 0.6 I ~ Q O ?r^ ~ Nv P Z 00 .-~z~~~ ^Yrv : . . .. ~ rl - r b JC - - - - ~ O ~ n ~ -__ _.. L 1 ^O ~ G r1 _ 00r~pM.G~r _ r ~ .'x ~ _. i ~ I ~i I ^~ C,. G v~C~rov.v :'v~ .. ~ ~~ a ~ Yr, - -- ~~ ---- -- p I ~ ~, I ~ y o0o00c.-, v'~i ~iN~N~ =o0000v ~ _- . -_f' _- __'_- ,J _ .~. ov:ooorr E ! ~ ~_ _ _ _ _^OOO.:G--000000 _ 000» - c = - oovo - - 7 .. .. . . ` 7 I ~ ~ I ~ _ +o~v zK ~Y ~ ~ -1 - O '. Q ~ ~'. t` ~ T r r r x O - .O ~C'J __--..Y~ r. x 2.~. ~ _ - -._.._ _.__.___..-. .... a _ _. _ -. I _ . Z ~~~ v ~ i ~ '~ - O r1 r~.Y r R ._~. ..._ ~ r, o LtJ - ..1 J = ' O ~ N ~ 3 r.°< . ~ _ I i ._ __ _. ~ W ~ v L _.. ____ _ _ __ a _.._- ti'L ~_ I r-~ L _. J ti _._._ v \\ ._ I ~ ~ N ~ v L'U~ ~~ ~ !~ ~ - Ca -. - - _ . .._- _-_ .. . o _._ _ i :~ r. y _ p _ . ~ - c ~ ~ ~ ~ ~I ~ - a .._ _ _ __ __--_. _ _ _ _ - ,. n ~ _ ~ r _ -- _-_-____- _ ^ ~ O. n _ __ . C4~ ~ 5 ~G ' ~ ~ ~ Y~l sta 20]5'C ~ y r~ ~ V ~ _ C ~' ~ ~ _ ., . _ J -0 II :407 m ~ ll 'f, f ]] - I I I .. f. - .. - - Z i.ST2 ~ s ~ Q - ~ ~~~...v~G~r ~^ wE ~ ~ _ ~, ~ o»=o~~~~o~_~~ ~ ~ c or, _,~,o ~~o_o~no C ~ -~ -'f r t _ Q ~ ~Gm~~f0~7 ~--- YTY~1Y?T "Y Y I ~ i ---- -rl..-r ~~.:I-~ ~ll~(~lyuo[1-141no5 ~ Sperry-Sun BP Planning Report Company: BP Amoco Date: 9/12/2007 Time: 10:22:05 Pager 1 Field: Milne Point Co-ordinate(NE) Reference: WeIL' Plan MPH-19, True North Site: M Pt H Pad Vertical (TVD) Reference:. 36.6GL+34.30KB 70.9 Well: Plan MPH-19 Section (VS) Reference: Well (O:OON,I):OOE,82.62Azi) Wellpath: Plan MPH-19 PB1 Survey CalculatiomMethod: Minimum Curvature Dh: .Oracle Plan: MPH-Diomed Pb1 Wp 8.0 Date Composed: 3/23/2007 Version: 31 Principal: Yes Tied-to: From Well Ref. Point Field: Milne Point North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: M Pt H Pad TR-13-10 UNITED STATES :North Slope Site Position: Northing: 6008971.91 ft Latitude: 70 26 6.665 N From: Map Easting: 555404.91 ft Longitude: 149 32 53.895 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.43 deg Well: Plan MPH-19 Slot Name: Grass roots plan for MPH-06 ST. Well Position: +N/-S 1124.70 ft Northing: 6010104.76 ft Latitude: 70 26 17.726 N +E/-W 1116.02 ft Easting : 556512.44 ft Longitude: 149 32 21.139 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 182.90 182.90 20.000 26.000 20" 3817.32 2920.90 10.750 12.250 10 3/4" 8176.76 4260.30 0.000 0.000 7 5/8" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg. deg 1851.26 1820.90 BPRF 0.00 0.00 5638.22 3680.90 TUZC 0.00 0.00 5743.61 3725.90 Ugnu-MA 0.00 0.00 6058.52 3850.90 Ugnu-M61 0.00 0.00 6184.33 3895.90 Ugnu-M62 0.00 0.00 6257.37 3920.90 Ugnu-MC 0.00 0.00 6637.47 4050.90 SBF2-NA 0.00 0.00 6732.11 4080.90 SBF1-NB 0.00 0.00 6854.79 4110.90 Fault- 70' DTNW 0.00 0.00 7170.18 4150.90 TSBD-Top OA 0.00 0.00 7496.14 4185.90 TSBC-Base OA 0.00 0.00 7767.14 4215.90 TSBB-Top OB 0.00 0.00 7994.79 4240.90 SBA5-Base OB 0.00 0.00 Targets Map Map <-- Latitude ---> <--- Longitude --> Name Description TVD +N/-S +E/-W Northing. Easting Deg Min Sec Deg Min Sec Dip... Dir. ft ft ft ft ft MPH-19PB1 T1 3985.90 1761.61 3058.33 6011889.33 559557.04 70 26 35.044 N 149 30 51.354 W -Circle (Radius: 100) -Plan hit target MPH-19 Fault 1 4185.90 1246.96 3092.40 6011375.00 559595.00 70 26 29.983 N 149 30 50.360 W -Polygon 1 4185.90 1246.96 3092.40 6011375.00 559595.00 70 26 29.983 N 149 30 50.360 W -Polygon 2 4185.90 2471.97 4431.85 6012610.00 560925.00 70 26 42.024 N 149 30 11.018 W -Polygon 3 4185.90 1246.96 3092.40 6011375.00 559595.00 70 26 29.983 N 149 30 50.360 W -Plan out by 780.37 at 4185.90 1132.80 3864.38 6011266.70 560367.75 70 26 28.857 N 149 30 27.700 W MPH-19PB1 T2 Rev 1 4260.30 541.50 4179.70 6010677.86 560687.51 70 26 23.040 N 149 30 18.453 W -Plan hit target Sperry-Sun BP Planning Report Company:. BP Amoco Date: 9/12/2007 Time: 10:22:05 Page:. 2 Field: M ilne Point Co-ordinate(N E) Reference: WeIL Plan MPH-19, True North Site: M Pt H Pad Vertical. (TVD) Reference: 36. 6GL+34.30K6 70 .9 Well: Pl an MPH-19 Section (VS)13eference: Well (l).OON,O.OOE,82.62Azi) Wellpath: Pl an MPH-19 PB1 Survey Calculation Method: Minimum Curvature Db: Oracle Plan Section Information MD Inch Azim TVD +N/-S +E/-W DLS Build Turn TFO Target. ft deg deg ft ft ft deg/100ft deg/100ft deg/1i)Oft deg 34.30 0.00 0.00 34.30 0.00 0.00 0.00 0.00 0.00 0.00 750.00 0.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 1000.00 5.00 45.00 999.68 7.71 7.71 2.00 2.00 0.00 45.00 1676.59 20.00 30.00 1658.46 129.48 86.87 2.25 2.22 -2.22 340.30 1747.85 21.96 30.00 1725.00 151.57 99.63 2.75 2.75 0.00 0.00 1882.63 21.96 30.00 1850.00 195.22 124.83 0.00 0.00 0.00 0.00 3074.67 69.41 37.53 2659.69 870.12 604.14 4.00 3.98 0.63 9.55 4149.14 69.41 37.53 3037.61 1667.77 1216.84 0.00 0.00 0.00 0.00 6197.42 70.00 126.22 3900.39 1900.44 2868.81 4.00 0.03 4.33 108.41 6447.42 70.00 126.22 3985.90 1761.61 3058.33 0.00 0.00 0.00 0.00 MPH -19PB1 T1 6647.42 70.00 126.22 4054.30 1650.56 3209.95 0.00 0.00 0.00 270.00 6997.42 84.00 126.22 4132.84 1449.55 3484.39 4.00 4.00 0.00 360.00 7197.42 84.00 126.22 4153.75 1332.02 3644.86 0.00 0.00 0.00 0.00 8176.76 84.00 165.62 4260.30 541.50 4179.70 4.00 0.00 4.02 92.14 Survey MD locl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft deg/100ft ft ft 34.30 0.00 0.00 34.30 -36.60 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 100.00 0.00 0.00 100.00 29.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 182.90 0.00 0.00 182.90 112.00 0.00 0.00 0.00 0.00 6010104.76 556512.44 20" 200.00 0.00 0.00 200.00 129.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 300.00 0.00 0.00 300.00 229.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 400.00 0.00 0.00 400.00 329.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 500.00 0.00 0.00 500.00 429.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 600.00 0.00 0.00 600.00 529.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 700.00 0.00 0.00 700.00 629.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 CB-GYRO 750.00 0.00 0.00 750.00 679.10 0.00 0.00 0.00 0.00 6010104.76 556512.44 Start Dir 2/ 800.00 1.00 45.00 800.00 729.10 0.35 0.31 0.31 Z.00 6010105.07 556512.75 CB-GYRO 900.00 3.00 45.00 899.93 829.03 3.11 2.78 2.78 2.00 6010107.56 556515.19 CB-GYRO 1000.00 5.00 45.00 999.68 928.78 8.63 7.71 7.71 2.00 6010112.53 556520.09 Start Dir 2. 1100.00 7.16 38.90 1099.12 1028.22 16.59 15.64 14.70 2.25 6010120.51 556527.02 CB-GYRO 1200.00 9.36 35.64 1198.07 1127.17 26.64 27.10 23.36 2.25 6010132.03 556535.59 MWD+IFR 1300.00 11.58 33.62 1296.40 1225.50 38.78 42.07 33.65 2.25 6010147.08 556545.77 MWD+IFR 1400.00 13.81 32.24 1393.95 1323.05 52.98 60.52 45.58 2.25 6010165.62 556557.55 MWD+IFR 1500.00 16.04 31.23 1490.57 1419.67 69.21 82.44 59.11 2.25 6010187.64 556570.92 MWD+IFR 1600.00 18.28 30.47 1586.11 1515.21 87.47 107.78 74.23 2.25 6010213.09 556585.85 MWD+IFR 1676.59 20.00 30.00 1658.46 1587.56 102.79 129.48 86.87 2.25 6010234.88 556598.32 Start Dir 2. 1700.00 20.64 30.00 1680.42 1609.52 107.73 136.52 90.94 2.75 6010241.95 556602.33 MWD+IFR 1747.85 21.96 30.00 1725.00 1654.10 118.28 151.57 99.63 2.75 6010257.07 556610.91 End Dir : 1 1800.00 21.96 30.00 1773.36 1702.46 130.12 168.46 109.38 0.00 6010274.03 556620.53 MWD+IFR 1851.26 21.96 30.00 1820.90 1750.00 141.76 185.06 118.97 0.00 6010290.70 556629.99 BPRF 1882.63 21.96 30.00 1850.00 1779.10 148.88 195.22 124.83 0.00 6010300.90 556635.78 Start Dir 4/ 1900.00 22.65 30.30 1866.07 1795.17 152.90 200.92 128.14 4.00 6010306.63 556639.04 MWD+IFR 2000.00 26.60 31.74 1956.96 1886.06 178.80 236.60 149.64 4.00 6010342.46 556660.27 MWD+IFR 2100.00 30.57 32.83 2044.75 1973.85 209.35 277.02 175.21 4.00 6010383.07 556685.53 MWD+IFR 2200.00 34.54 33.69 2129.03 2058.13 244.41 321.99 204.73 4.00 6010428.26 556714.71 MWD+IFR 2300.00 38.52 34.39 2209.37 2138.47 283.79 371.30 238.06 4.00 6010477.82 556747.65 MWD+IFR 2400.00 42.50 34.98 2285.38 2214.48 327.31 424.69 275.02 4.00 6010531.48 556784.21 MWD+IFR 2500.00 46.48 35.48 2356.70 2285.80 374.75 481.92 315.45 4.00 6010589.01 556824.20 MWD+IFR 2600.00 50.47 35.93 2422.98 2352.08 425.89 542.70 359.14 4.00 6010650.11 556867.43 MWD+IFR 2700.00 54.46 36.32 2483.90 2413.00 480.48 606.73 405.89 4.00 6010714.49 556913.68 MWD+IFR 2800.00 58.45 36.68 2539.15 2468.25 538.24 673.71 455.46 4.00 6010781.83 556962.74 MWD+IFR 2900.00 62.44 37.01 2588.47 2517.57 598.91 743.30 507.61 4.00 6010851.81 557014.36 MWD+IFR 3000.00 66.43 37.31 2631.62 2560.72 662.17 815.17 562.09 4.00 6010924.09 557068.29 MWD+IFR nent 5 ~S 4S ~S AS AS ~S l7 1S AS ~S AS r1S r1S AS ~S AS 1S AS AS ~S Sperry-Sun BP Planning Report 'Company:. BP Amoco Date: 9/12/2007 Time: 10:22:05 Paget 3 Fields Milne Point Co-ordinate(NE) Reference: Well: Plan MPH-19, True North Site: M Pt H Pad Vertical (TVD}Reference: 36. 6GL+34.30KB 70 .9 Well: Plan MPH-19 Section (VS) Reference: Well (l).OOtV;0.00E;82.62Azi) Wellpath: Plan MPH-19 PB1 Survey Calculation Method: Minimum Curvature Db: OraGe Survey MD Inch Azim TVD Sys TVD VS N/S E/W DLS MapN MapE , Tool/Ca ft deg deg. ft ft ft ft ft deg/100ft _ ft ft 3074.67 69.41 37.53 2659.69 2588.79 710.92 870.12 604.14 4.00 6010979.35 557109.91 End Dir 3100.00 69.41 37.53 2668.60 2597.70 727.66 888.92 618.58 0.00 6010998.26 557124.21 MWD+IFR 3200.00 69.41 37.53 2703.77 2632.87 793.75 963.16 675.61 0.00 6011072.92 557180.66 MWD+IFR 3300.00 69.41 37.53 2738.94 2668.04 859.84 1037.40 732.63 0.00 6011147.58 557237.12 MWD+IFR 3400.00 69.41 37.53 2774.12 2703.22 925.93 1111.63 789.65 0.00 6011222.24 557293.57 MWD+IFR 3500.00 69.41 37.53 2809.29 2738.39 992.02 1185.87 846.68 0.00 6011296.90 557350.03 MWD+IFR 3600.00 69.41 37.53 2844.46 2773.56 1058.11 1260.11 903.70 0.00 6011371.56 557406.48 MWD+IFR 3700.00 69.41 37.53 2879.64 2808.74 1124.20 1334.34 960.73 0.00 6011446.22 557462.94 MWD+IFR 3800.00 69.41 37.53 2914.81 2843.91 1190.29 1408.58 1017.75 0.00 6011520.88 557519.39 MWD+IFR 3817.32 69.41 37.53 2920.90 2850.00 1201.74 1421.44 1027.63 0.00 6011533.81 557529.17 10 3/4". 3900.00 69.41 37.53 2949.98 2879.08 1256.38 1482.82 1074.77 0.00 6011595.54 557575.84 MWD+IFR 4000.00 69.41 37.53 2985.15 2914.25 1322.47 1557.05 1131.80 0.00 6011670.20 557632.30 MWD+IFR 4100.00 69.41 37.53 3020.33 2949.43 1388.56 1631.29 1188.82 0.00 6011744.86 557688.75 MWD+IFR 4149.14 69.41 37.53 3037.61 2966.71 1421.03 1667.77 1216.84 0.00 6011781.54 557716.49 Start Dir 4/ 4200.00 68.78 39.60 3055.76 2984.86 1455.18 1704.92 1246.46 4.00 6011818.91 557745.82 MWD+IFR 4300.00 67.61 43.72 3092.92 3022.02 1525.27 1774.27 1308.15 4.00 6011888.72 557806.98 MWD+IFR 4400.00 66.56 47.91 3131.87 3060.97 1598.99 1838.46 1374.17 4.00 6011953.40 557872.51 MWD+IFR 4500.00 65.61 52.16 3172.43 3101.53 1675.99 1897.16 1444.21 4.00 6012012.63 557942.09 MWD+IFR 4600.00 64.79 56.48 3214.39 3143.49 1755.88 1950.10 1517.91 4.00 6012066.12 558015.39 MWD+IFR 4700.00 64.09 60.84 3257.55 3186.65 1838.29 1997.02 1594.93 4.00 6012113.61 558092.04 MWD+IFR 4800.00 63.53 65.26 3301.70 3230.80 1922.81 2037.68 1674.89 4.00 6012154.88 558171.68 MWD+IFR 4900.00 63.10 69.71 3346.63 3275.73 2009.03 2071.89 1757.39 4.00 6012189.71 558253.91 MWD+IFR 5000.00 62.81 74.19 3392.12 3321.22 2096.52 2099.49 1842.04 4.00 6012217.95 558338.34 MWD+IFR 5100.00 62.67 78.68 3437.94 3367.04 2184.86 2120.34 1928.42 4.00 6012239.44 558424.55 MWD+IFR 5200.00 62.67 83.19 3483.87 3412.97 2273.63 2134.33 2016.11 4.00 6012254.10 558512.13 MWD+IFR 5300.00 62.81 87.68 3529.70 3458.80 2362.38 2141.40 2104.69 4.00 6012261.84 558600.64 MWD+IFR 5400.00 63.10 92.16 3575.18 3504.28 2450.69 2141.51 2193.73 4.00 6012262.63 558689.66 MWD+IFR 5500.00 63.53 96.61 3620.12 3549.22 2538.12 2134.67 2282.78 4.00 6012256.46 558778.76 MWD+IFR 5600.00 64.09 101.03 3664.27 3593.37 2624.26 2120.91 2371.42 4.00 6012243.37 558867.49 MWD+IFR 5638.22 64.34 102.70 3680.90 3610.00 2656.75 2113.83 2405.10 4.00 6012236.55 558901.22 TUZC 5700.00 64.79 105.39 3707.44 3636.54 2708.67 2100.29 2459.21 4.00 6012223.42 558955.43 MWD+IFR 5743.61 65.13 107.28 3725.90 3655.00 2744.85 2089.17 2497.12 4.00 6012212.59 558993.42 Ugnu-MA 5800.00 65.61 109.71 3749.40 3678.50 2790.96 2072.91 2545.73 4.00 6012196.70 559042.14 MWD+IFR 5900.00 66.55 113.96 3789.96 3719.06 2870.71 2038.91 2630.55 4.00 6012163.35 559127.21 MWD+IFR 6000.00 67.61 118.15 3828.92 3758.02 2947.54 1998.46 2713.26 4.00 6012123.53 559210.22 MWD+IFR 6058.52 68.28 120.57 3850.90 3780.00 2991.00 1971.87 2760.53 4.00 6012097.30 559257.68 Ugnu-M61 6100.00 68.77 122.27 3866.09 3795.19 3021.08 1951.75 2793.47 4.00 6012077.43 559290.77 MWD+IFR 6184.33 69.83 125.70 3895.90 3825.00 3080.27 1907.65 2858.86 4.00 6012033.84 559356.49 Ugnu-M62 6197.42 70.00 126.22 3900.39 3829.49 3089.21 1900.44 2868.81 4.00 6012026.70 559366.49 End Dir : 1 6200.00 70.00 126.22 3901.28 3830.38 3090.96 1899.00 2870.77 0.00 6012025.28 559368.46 MWD+IFR 6257.37 70.00 126.22 3920.90 3850.00 3130.00 1867.14 2914.26 0.00 6011993.75 559412.19 Ugnu-MC 6300.00 70.00 126.22 3935.48 3864.58 3159.01 1843.47 2946.58 0.00 6011970.33 559444.68 MWD+IFR 6400.00 70.00 126.22 3969.68 3898.78 3227.05 1787.95 3022.39 0.00 6011915.38 559520.90 MWD+IFR 6447.42 70.00 126.22 3985.90 3915.00 3259.32 1761.61 3058.33 0.00 6011889.33 559557.04 MPH-19P 1 6500.00 70.00 126.22 4003.88 3932.98 3295.10 1732.42 3098.19 0.00 6011860.44 559597.12 MWD+IFR 6600.00 70.00 126.22 4038.09 3967.19 3363.15 1676.89 3174.00 0.00 6011805.49 559673.34 MWD+IFR 6637.47 70.00 126.22 4050.90 3980.00 3388.64 1656.09 3202.41 0.00 6011784.91 559701.90 SBF2-NA 6647.42 70.00 126.22 4054.30 3983.40 3395.41 1650.56 3209.95 0.01 6011779.44 559709.48 Start Dir 4/ 6700.00 72.10 126.22 4071.38 4000.48 3431.42 1621.18 3250.07 4.00 6011750.36 559749.82 MWD+IFR 6732.11 73.39 126.22 4080.90 4010.00 3453.63 1603.06 3274.80 4.00 6011732.43 559774.69 SBF1-NB 6800.00 76.10 126.22 4098.76 4027.86 3501.06 1564.36 3327.64 4.00 6011694.14 559827.81 MWD+IFR 6854.79 78.29 126.22 4110.90 4040.00 3539.74 1532.79 3370.74 4.00 6011662.90 559871.15 Fault - 70' 6900.00 80.10 126.22 4119.37 4048.47 3571.90 1506.55 3406.57 4.00 6011636.94 559907.17 MWD+IFR neat '4 ~S ~S ~S 1S ~S ~S 4S 4S 4S ~S ~S 0 4S ~S ~S QS QS AS 9S ~S ~S ~S ~S AS ~S 9S ~S 4S ~S ~S ~S 17 9S ~S ~S T1 ~S ~S 0 7S ~S 'N ~S Sperry-Sun BP Planning Report Company; BP Amoco. Date: 9/12/2007 Time: 10:22:05 Page:. 4 Field: Milne Point Ca-ordinate(NE) Reference: WeIL Plan MPH-19, True NOrth Site: M Pt H Pad Vertical (TVD) Reference: 36. 6GL+34:30i<B 70 .9 Well; Plan MPH-19 Section (VS) Reference: Well. (o:00N,0.00E,82.62Azi) Wellpath: Plan MPH-19 P61 Survey Calculation Method:' Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft deg/100ft ft ft 6997.42 84.00 126.22 4132.84 4061.94 3641.76 1449.55 3484.39 4.00 6011580.53 559985.41 End Dir 7000.00 84.00 126.22 4133.11 4062.21 3643.61 1448.03 3486.46 0.00 6011579.03 559987.50 MWD+IFR 7100.00 84.00 126.22 4143.56 4072.66 3715.63 1389.27 3566.70 0.00 6011520.88 560068.16 MWD+IFR 7170.18 84.00 126.22 4150.90 4080.00 3766.18 1348.03 3623.01 0.00 6011480.07 560124.78 TSBD-Top 7197.42 84.00 126.22 4153.75 4082.85 3785.79 1332.02 3644.86 0.00 6011464.23 560146.75 Start Dir 4/ 7200.00 84.00 126.32 4154.02 4083.12 3787.65 1330.50 3646.93 4.00 6011462.73 560148.83 MWD+IFR 7300.00 83.86 130.34 4164.60 4093.70 3857.06 1268.84 3724.91 4.00 6011401.67 560227.27 MWD+IFR 7400.00 83.76 134.37 4175.38 4104.48 3921.30 1201.87 3798.37 4.00 6011335.27 560301.22 MWD+IFR 7496.14 83.69 138.23 4185.90 4115.00 3977.89 1132.80 3864.38 4.00 6011266.70 560367.75 TSBC-Bas 7500.00 83.68 138.39 4186.32 4115.42 3980.06 1129.93 3866.93 4.00 6011263.85 560370.32 MWD+IFR 7600.00 83.64 142.41 4197.37 4126.47 4033.03 1053.37 3930.27 4.00 6011187.78 560434.23 MWD+IFR 7700.00 83.63 146.44 4208.46 4137.56 4079.97 972.55 3988.07 4.00 6011107.41 560492.64 MWD+IFR 7767.14 83.64 149.14 4215.90 4145.00 4107.99 916.10 4023.63 4.00 6011051.23 560528.63 TSBB-Top 7800.00 83.65 150.46 4219.54 4148.64 4120.65 887.87 4040.06 4.00 6011023.13 560545.27 MWD+IFR 7900.00 83.70 154.49 4230.56 4159.66 4154.87 799.75 4085.98 4.00 6010935.37 560591.85 MWD+IFR 7994.79 83.78 158.30 4240.90 4170.00 4181.19 713.42 4123.70 4.00 6010849.34 560630.22 SBAS-Bas 8000.00 83.78 158.51 4241.46 4170.56 4182.46 708.61 4125.61 4.00 6010844.54 560632.17 MWD+IFR 8100.00 83.89 162.53 4252.20 4181.30 4203.29 614.90 4158.76 4.00 6010751.09 560666.02 MWD+IFR 8176.70 84.00 165.62 4260.29 4189.39 4214.62 541.56 4179.68 4.00 6010677.92 560687.50 Total Dept 8176.76 84.00 165.62 4260.30 4189.40 4214.63 541.50 4179.70 4.00 6010677.87 560687.51 7 5/8" vent IS IS IS )A IS ul I I rn I:VI ` AN-rI-COLLISION SE-rTINGS Iahn'nlvr uclnN .a wkvr:v rNlx~knM V.111. ~.~ 1..11 \ I ~~_ I.. I l.k I INIc %I„ III 1 ~ I ~I I Ik~lhl 11.111 I,I,I I I.Ip IJII Il tilll1 x11ID I t I. X110 II IM1II'I I-IV IIA-.~ II'~~.; ~~^I~ J-1. .c,,. y.l -~~_l,l N H'. :_'II IAi VA I •Illh N' I 11 31:0 T FI (7b 11L MV Ihl vun. .J-~ I' II ~I. All II I>. ~.Ilbl Aip.% III ,11tH-.> n Ran, ~- 1011 '~ N.I~r. In Plu 1: \IPII-UlouleJ I'hl \Cp s.0 1' .. - I 1 ii-a I %I '~. , I I~1 .d. hull n. ..u M1I eh %. ilen a It al. Iu M~InI+L Irer t~l I11.rN Ilb rRllr s4rr a~: eul~h.:d , \\:lnlllly M1taNN„1' Ituks Ikn.11 .~• 160 150 125 100 75 50 25 0 2 25 50 75 100 •125 150 160 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SOft/in] ~_ olour TO MD - 250 500 7SO 1000 1250 ISOO - 1750 2000 2500 1'Ixn hll'I I-141'141 Nlp: U IJ Ncl: u~lwll: lo.rna. iJ.iul;u nl.eun M1'ti.~..:l i.`n (1nµ111 IMNUI .%wnl ~ 1npl.~ N ~~ I--N' I-n,m I\'11 x_„_ ...II ..III. ;J 1, 3000 I Irll X11 3SOO ~ hll'll ill Ihll'I l-'III. M1I.'N,r It I.A 4000 ~ nu'u-Ic Intru-'cl. nLIN'r Nl.k 4SOO ~ hll'llali IMI'I l-4i1. M1l.ipn Itnk hil'IIJH IhII'll~lul. M1lal,m Nl.A SOOO ~ hll'll-n<Ihll'I l-Il•1. hl:ln~r Ni.A hf 1'I Iau.1Ml'l l-4t~1. hl.~n'1 Nnk hll'l I~U7 IM111'11-11'1. hlNn'r knk '-- hll'Il-u'IAI I'I l-II'nl. M1inNir NI.A M111'I l-II]Ihll'I l-4]:\I II. M11.q~x Nnk M1I I'I l-Ili 1 M11I'I 1-111.11 I I'R I I. M1I:II' a Itl.k M I'l lali I hl I'I l-ulnl 11'1121. N.q,~r Nnk hll'll-Il]lhll'11-11'nl'Itll hteprc kinA hll'I l-nx lhll'I l-1%1. h/:1NV link hll'll-uN lhll'I I.I Ixn 1. Mal'.r kui'. -~- hll'I la'x Ihll'I I-11%,\I'Iil1. Mql"r Nlsk M111'I l-nx IM111'1I~I 1%111. M1lxl'rz ltlxk M I'I l-uN 1M1'Ilal%I11 I1. M1l.ln'r lilNk ' l ' ' I1~11x111 M1II I I~11%IM1I1 1111. MaN'r tlXk hIl'11-44IM111'I l-Ilo 1. hl:l p,r ltuk ---~ hll'I l-III iMl'11-1111. hl.y.4 link M1II'I l-II IAII'I I~111, MaN`I Nuk hl I'I l-I_ IMI'I I-121. hIePN k1.Nk hll•II~ItIM1II'I I~I tl. hl:l l"r Nnk - AIl'II-Illkfl'I hl b\I. AI:II"r NfiJl hlI•I I~IJ IhII'I l-IJI. M1I.11'~r I<uk M1I I'I l-I' Ihll'I I-I~1. hlnN'r Nnk hl I'I I-1 /, IM111'I I-11.1-M1I+I.rt Nl.~k hlI'I I~In Ihf l'I l-Ir.l Il. hIaXN Nnk hl I'I I~Ih Ihll'I I~IfiI'lil 1. M11:In'r Nl.k hll'Il~lfi lhll'I1-11.1'11_1. hL!Nrt Nl.k hl I'I l-Il,lhll'I I~IfiI'lli 1. h1aN`r Nuk M1I I'I l-1' Ihil'I1~1'I, hlaprt ItI.Nk hll'll~l]INI%All'I l-I'I. M:11"r Nnk hll'II-1%Ihll'll~lNl, AI:IMn kuk Al I'l l-I%IM1I I'l l~lxl II. h1:IN'r Nuk M111'II-I%IMI'II~IM _'I. AI+yrt Nuk I'I:111 h11'I I~I"1.111 M1I 1'11-111,vI1.J I'hl Np %~I 1 Removed. I ;an for Plans le cu No Errors CIA IICIN 1)I:I nll III. \il I\I1 Ni-.~ I.-\\ III.F II:I1. \~.. I.il~,_~I tJ. ill 1,1111 ](11.1111 II.IXI N t IN1 J<II11 44')11% 1]I 1.71 2.1X1 J<1N1 %~( i ,111.1111 1(<>LJR 124.Jx NG%] 2~ 1411.,111 1112.711 1.11(, iuAXl 172-<.ull I~I.~] `Ill.fii :.1< u.llll IIN._'N I"G 111.1111 I%111111 I4<'? 124.X3 11,1111 111111 IJ%%x l.Jl i].~i 1fi:111,4 %]11.12 (NN.IJ 4.1X1 4,c< ]III ".'. ,.JI i].Ci Uli],fil Ififi].]] 121G.%i 11.1111 11,1111 1!21,114 1.1X1 I'_fi.2 11X111 i4 141X1-JJ 2NIa{% J,INI IIx.J 111x'),'_1 111 riJ1.12 TuNI 12fi.L i4x5.v11 I]61,b1 ill~x.il 0.1X1 Il,uu i2c4.C MI•I I-1'11'141 I1 II fifiJl.J2 ]II IIII 121..22 JIKJ. iII Il,~II,C(, 121 N,,4~ 11.1X1 2]111X1 Ii4N.J 12 (,`1'1].Y %J.INI 121,.?' JI i2.xJ IJJ4.C< iJ%J34 J,INI ifi111N1 i1.{I:/R li ll'1]A2 %!.1111 12F.2'_ Jlti,]~ Ii31U2 i(lil%G II.INI II.INI 41%<,74 IJ xl ]n.]l, 111fx1 Ifi%b2 J2fill.ill ~J l.vl JI]4,]Il J.INI 4111 J21J.fi,i Sperry-Sun Anticollision Report Company: $P Amoco Date: 9!12/2007 Time: 10:20:33 Page:. 1 Field: Milne Point Reference Site: M Pt H Pad Co-ordinate(NE) Reference:. ' Well'. Plan MPH-19, True North Reference Well: Plan MPH-19 Vertical (TVD) Reference: 36.6GL+34.30KB 70.9 Reference Wellpath: Plan MPH-19 P61 Db:' Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Erro r Model: ISCWSA Ellipse Depth Range: 34.30 to 81 76.76 ft Scan Method: Trav Cylinder North Maximum Radius: 1014.25 ft Erro r Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 3/12/2007 Validated: No Version: 3 Planned From To Survey Toolcode Tool Name ft ft 34.30 1200.00 Planned: MPH-Diomed Pb1 Wp 8.0 V31 CB-GYRO-SS Camera based gyro single shots 1200.00 8176.76 Planned: MPH-Diomed Pb1 Wp 8.0 V31 MWD+IFR+MS MWD +IFR + Multi Station Casing Points 1VID TVD Diameter .Hole Size Name ft ft in in 182.90 182.90 20.000 26.000 20" 3817.32 2920.90 10.750 12.250 10 3/4" 8176.76 4260.30 0.000 0.000 7 5/8" Summary G~~___-___ O ffset Wellpath - -----------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area.. Deviation Warning ft ft ft ft ft M Pt G Pad MPG-09 MPG-09 V2 7812.98 6725.00 582.71 216.15 366.56 Pass: Major Risk M Pt H Pad MPH-01 MPH-01 V1 398.89 400.00 226.98 8.11 218.87 Pass: Major Risk M Pt H Pad MPH-02 MPH-02 V1 423.88 425.00 179.86 11.20 168.67 Pass: Major Risk M Pt H Pad MPH-03 MPH-03 V1 648.65 650,00 141.81 13.69 128.12 Pass: Major Risk M Pt H Pad MPH-04 MPH-04 V1 1187.66 1175.00 116.08 22.05 94.03 Pass: Major Risk M Pt H Pad MPH-05 MPH-05 V1 960.23 950.00 127.35 17.73 109.61 Pass: Major Risk M Pt H Pad MPH-06 MPH-06 V1 629.88 625.00 155.97 12.11 143.86 Pass: Major Risk M Pt H Pad MPH-07 MPH-07 V1 579.89 575.00 250.78 10.43 240.35 Pass: Major Risk M Pt H Pad MPH-07 MPH-07A V12 574.89 575.00 250.72 10.42 240.30 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 V5 574.89 575.00 250.72 10.16 240.56 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 P61 V4 574.89 575.00 250.72 10.42 240.30 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AL1 P62 V6 574.89 575.00 250.72 10.42 240.30 Pass: Major Risk M Pt H Pad MPH-07 MPH-07AP61 V25 574.89 575.00 250.72 10.26 240.46 Pass: Major Risk M Pt H Pad MPH-08 MPH-08 V3 280.21 275.00 199.53 5.76 193.78 Pass: Major Risk M Pt H Pad MPH-08 MPH-08A V4 280.21 275.00 199.53 5.91 193.62 Pass: Major Risk M Pt H Pad MPH-08 MPH-08APB1 V3 280.21 275.00 199.53 5.91 193.62 Pass: Major Risk M Pt H Pad MPH-08 MPH-086 V5 280.21 275.00 199.53 5.91 193.62 Pass: Major Risk M Pt H Pad MPH-08 MPH-08BL1 V16 280.21 275.00 199.53 5.91 193.62 Pass: Major Risk M Pt H Pad MPH-08 MPH-08BP61 V1 280.21 275.00 199.53 5.91 193.62 Pass: Major Risk M Pt H Pad MPH-09 MPH-09 V3 358.89 350.00 156.27 6.96 149.31 Pass: Major Risk M Pt H Pad MPH-10 MPH-10 V9 514.97 500.00 126.12 9.75 116.37 Pass: Major Risk M Pt H Pad MPH-11 MPH-11 V6 515.98 550.00 96.46 9.61 86.86 Pass: Major Risk M Pt H Pad MPH-12 MPH-12 V2 463.79 450.00 65.71 9.15 56.56 Pass: Major Risk M Pt H Pad MPH-13 MPH-13 V4 661.33 650.00 30.45 12.79 17.66 Pass: Major Risk M Pt H Pad MPH-13 MPH-13A V4 655.69 650.00 30.33 12.57 17.75 Pass: Major Risk M Pt H Pad MPH-14 MPH-14 V7 390.25 375.00 6.02 7.88 -1.87 FAIL: Major Risk M Pt H Pad MPH-15 MPH-15 V6 1041.10 1050.00 73.11 21.38 51.73 Pass: Major Risk M Pt H Pad MPH-16 MPH-16 V5 1563.18 1550.00 103.85 26.91 76.94 Pass: Major Risk M Pt H Pad MPH-16 MPH-16L1 V4 1563.18 1550.00 103.85 26.65 77.20 Pass: Major Risk M Pt H Pad MPH-16 MPH-16PB1 V2 1563.18 1550.00 103.85 27.71 76.14 Pass: Major Risk M Pt H Pad MPH-16 MPH-16PB2 V2 1563.18 1550.00 103.85 27.71 76.14 Pass: Major Risk M Pt H Pad MPH-16 MPH-16P63 V2 1563.18 1550.00 103.85 27.71 76.14 Pass: Major Risk M Pt H Pad MPH-17 MPH-17 V5 176.09 175.00 144.37 5.01 139.37 Pass: Major Risk M Pt H Pad MPH-17 Rig MPH-17 V3 175.88 175.00 145.06 5.55 139.51 Pass: Major Risk M Pt H Pad MPH-18 MPH-18 V6 1344.87 1325.00 160.57 24.07 136.50 Pass: Major Risk M Pt H Pad MPH-18 MPH-18L1 V3 1344.87 1325.00 160.57 23.81 136.76 Pass: Major Risk M Pt H Pad MPH-18 MPH-18L2 V2 1344.87 1325.00 160.57 23.81 136.76 Pass: Major Risk M Pt H Pad Plan MPH-19 Plan MPH-19 V2 Plan: M 175.00 175.00 0.00 1.34 -1.34 FAIL: NOERRORS EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 6050000 6000000 5950000 5900000 5850000 400000 500000 600000 700000 800000 Alaska Department of Natural Resources Land Administration System Page 1 of 4 • • ~~ ~ . ,f ~ . ; ~ ~~ ~ , ~ _~, ~ecE~r;1e~'~ ~~~rch State Cabins ~ 17 ~ ~~4a ~ Alaska R a~ Su pry File Type: AUK File Number: ~ 25518 ~ Printable Case File. _Summary See Township, Range, Section and Acreage? ~,, New Search Yes ~ No AS M~n~, I Case Abstract I Case Detail I Land Abstract _, I~flc~: r~DL 2~~1R ~'~` Sr:arcY~ fc~r Statics Plat Updat='s 1> ~~I~ IO'1 li~(i(C Czrston~er: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL AT"CN: LAND MANAGER- ALASKA ANCHOEZAGE AK 99~ 196612 Case Tips ,'~~ OII. & GAS LEASE COMP DNR Unit: 780 O[L AND GAS File Locution: DOG DN OIL AND GAS Case Status: 35 ISS/APPRV/ACTV/ AUTII Scalars Date: 0 022/1965 Total floes: 2560.000 Dute Initiated : 11 /02/1964 Office. of Primur•y Reshonsibilily: DOG DIV O IL AND GAS East Transaction Dote: 10/23/2003 Case S'ubh-/~~ : NORTH SLOPE Last Transaction: AA-NRB ASSIGNMF,NT APP ROVED 11~Ieridiarz: U To~~~nship: 013N Range: OlOE Section: 25 S~cr[iu~~ ,I~~~~~~~: 640 Search .Meridian.: U Township: Ul N I~'~rnge: 010E 5~~~~itort: 26 Sectionl~lrr~~~~.~ 6 ~U sl~Ierrdretn: U Tolvraship: ul N R~~rrSe: OlOE S~z~~ion: 35~ Sectiorz~l~~r~~~~: t,~l) .'~~IE'r1d1C7n: I3 TOlt'7151?lp: O ~ i'V~ ~~'~lll~e: 010E SeCtlOn: 36 Secta~l/1 .~Cl'c'S.~ (>-GO Legal llescription 11-1)?-1 J6-l * ` ~ S:1LE ~'~ OTICE LEGAL DFSC'RIPTIO.V ~` t~' 3-1-13:1LL ,S'EC'TIO.~r2~, T13iV, 1Z10E. UaI6-10 -tLL SEC'TIO;V ?6. " " " 6-10 ALL SECTION 33, „ " „ 610 AGI, SEC'TIO~h 36. „ ,~ „ 6-10 CO:~'T.91Y%1'C: ?,~<>0 :ACRES http://www. dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25 518... 10/ 11 /2007 Alaska Department of Natural Resources Land Administration System 10-?3-1981 * * ~ UNITIZED LEGAL DESCRIPTION ;IIIL:~,E POI'N'T I~:'~'II' Tf 3~1~', RIDE. UrII SEC"LION 2~, ALL 6-10 ACRES SECTION?6, :ALL 6-10 ACRES SECTION 36, .~1 LL 6-1D ACRES CONlAL'VING 1.930ACRES. MORE OR LESS. 0-1-Z3-198C *** PARTICIPATING AREA LEG~1~ DESCRIPTION ~~** AIILNE POINT PARTICIPATING ARE.~1 TI >,'~;; RI CIE, Zi;II SECTIO,I ?~::1I,L <-l0 ACRES' SEC'TIO;~- 26: Eli?,'%EI%'-1: b'O.-iC'RF_S CO;~"711~~'1.-VG "?0 ACRES', ~1~IORE OR LE,S,S'. 0?-()~-195'-1 *** U,VITIZF_U LEGAI, DESCRIPTIO.,~; aI1L~~'EPOL'1'T IIVIT TI3~~~. RIOE. Ull~f S'EC'TIOi1% ?~, ALL 6=10 ACRES S'EC ' TIO.'~' ? 6, .~1 L 1. 610 :1 C'RGS' SECTIO~1- 3 ~, <-1LL 640 ACRES SECTION 36, ALL 6-10 ACRES CONI:11_VING Z,~60 ACRES, 11~IO2E OR LESS. 03-22-82 '`~` `.-1SSIG~~V~IENT LEGAL DESCRIPTION *** S'EGaIEVT 1 T 13:'x', R IOE, LL~1 Page 2 of 4 http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25518... 10/ 11 /2007 Alaska Department of Natural Resources Land Administration System Page 3 of 4 • S'EC'TIO;~;' ? ~: ;11,L E:Y('L LiDL'~'G 1~'E1~' I -I~~'O ;gC'RGS S1sCTI0:~'?6::-ILL 6-JO.=~C'RE,S SECTION 3~: ALL 6-10 ACRES SECTION 36: ALL 6-10 ACRES CONTAINING 3100 ACRES, MORE OR LESS. SEG~l1ENT 2 -LANDS ASSIGNED T 13N, R lOE, Ulf S'EC'TION ' ~: ;'~'h_~1~'-1 1 CO ACRES C'C~ ~'T.~II;'4'L'1'(T I h0 :9C'RL~S.:~IORE OR LESSS'. :k :k ;t ;k :<#.**%K#**%k#~ <~:t=k:kx~:k:g*=k=k~=k*x~;~~:k:<x~;k=k~*:k ~:xk:k ~k >;<**xx:k ~k >;<:g ;k~ ~:k ;<~: <:k ~~ <=k _* ASSIGNMENT LEC:_4L DESC'RIPTION' 3-?-8-t EL.LLIIN' 1 TL'S S'EG:~-LENT 2 ;VE6~'LEG:-1L DESCRIPTION! T 13:V . R. I OE. , L;IIL ~ T ;~IERIDL-I,V SI~~C'TION 2~: ALL, 6=J0 ACRES; ,SEC'TION' ?6: ALL. 6-10 . ~C'RES: SEC'7IUN 3~: ALL, 6=10 ACRES: SEC'TION36: SILL. 6-10.1CRES. CC~~'T iL'~'LVG 260 AC'RES', ,~11ORF. OR LESS. *:t ;k :k~**~#*ik 'rT <~k 'T :'r-%k <~;==k ~k~:k;;<:k a_:;<~:k ~=~~=k ~:Fx;<x~x~k ~k ;: ~k ~kx~k ~k~ ~;k ,I= t*.~%: :t ;<a„t :k : ~: <:k ~_* -30-91 *~**PARTICIPATINGIIREA LEG<~1L DESCRIPTIOII~'*~`~ S'CHRADEIZ BL UI.7' P.4 S'.,~1;11E ,~~STHE UNT7 LF,G.1L DES'C'IZIPTIO.V :POI%E, D.aTED?-%-<5'-1 11-1-96 *'~* L'XI'.~;'~'DED hUI'.9Rt~1~ P;1 L,EG:~II, DESC'RIPTI()~ :` http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25518... 10/ 11 /2007 Alaska Department of Natural Resources Land Administration System Page 4 of 4 • T 13 .N. , R 10 E. , U. M. SEC. 2~: ALL; SEC.'. 26: EI/2NE1/-l; CONT9INING 500. UO ACRES, ~170RE OR LESS. E ~~ ~ I~ Last updated on 10/11/2007. Not sure who to contact? Have a question about DNR? Visit the Pt~falic Ir~~ret;~n C~°°nt;~r. Report technical problems with this page to the ~febrr`saser. Site optimized for Netscape 7, IE 6 or above. This site also requires that all Ct3~IE must be accepted. Mate of Aias~a Nature(. Resources LAS. Nome Ccapyri~ht Prsvacy System Status http: //www.dnr. state. ak.us/las/Case.Summary.cfm?FileType=ADL&FileNumber=25 518... 10/ 11 /2007 ~ ~ TRANSMITTAL LETTER CHECKLIST WELL NAME ~i~~ J9 PTD# 0?0~,/~~~ Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing exception. , assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit; Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Company Namel has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 7/13/2007 • • ^^ . : : : m p Q ~ ~ ~ ~ ~ ~ ~ O N' a O c, O ~ o. N, c m °: n m, O) ~, N. a. a ~: d m 2 '~ c, ~ fl. n . rn .o, .~ U ~ O o m' n a, m. rn ° O, ~: 7. OS ~ ~ L. ~ , ~ ~ ~ ~ ~ i ~ U U. N~ O ~ Q; ~ m' ~ ~ ~ ~ . ~ ~ J a0 ~ ~ ~ ~ ~ ~ ~ O), ~ ~ ~ ~ ~ ~. ~ ~ ~ y~ ~ OL ~ N ~ ~ ~~ N O ~ ~ ~ ~ ~ ~ C: ~ ~ ~ ~ N• ~ ~ ~ ~, ~ C: ~ x ~ ~ ~ vy ~ ~ ~ C• Z ~ ~ ~ ~ ~ N: ~ ~ ~ O ~ ~ a` ~ ~ a ~ E: >. ~ U, ~ ~, a, ~ 2. j ~ ~ ~ ~ gyp, 2. ~ ~ Z ~: m: ~ ~ _ a~, rn . X: o: •X. m, m: a. o c, ~ w m: ~ Q ~ o., g, g g, a a , o b ~, I a. Z y~ ~ } y: N~ VD ~ ~ ~ }; }.~-' N, ~, ~- N. N, ~ ~ }'} N~ f/b ~ ~ ~-,}, N. ~ r' U~ ~ r N ~ r a' ¢' a' Q zz~zz N~ N: ~ ~ a' ~. o z y~ ~, N~ ~~ M, ~ ~ N: ¢' ~, N. y~ H: N~ N~ ~ ~ ~ ~ ~~ N~ ~ ~ p a; N. ~. ¢; ¢' ¢' N~ Q , r ~z } ~- } zr, ~rrrr rzz ~- Z ZZ ~- (t a ; ~ ~ o q ' ~ ~ c_ , ~ '~ o o O. o ~ ._ v - ~' ~ n 3: o: O a 3 O ~, M, ~, i ~, ~, N. V, N: y. Q' ~ N. y. N ~ ~ O ~ ~ ~ W~ ~ ~ ~ ~ O>~ ~ ~: N. N ~ ~ ~ ~ ~ ~ O Q w ~ ~ ~~ ~ ~ ~ ~ j. ~C, O: ~, ~ ~ U ~ ~ Q (6, ~ U, ~i ~ ~ N. ~ , N N ~ 7 O 7 Ul tll Z Z ~ ~ ._~ -`a t, a ~ ~ c a `: o: ~~ ~, ~ .c f6 a 3 , ~ 3 ~ m. a ~ (n C O ~ o. c. L o m, ~ p N o. o: , p ~ to rn ~, >, a. ~ c N' N ~, N' ~ c: C1S • O d ~ ~ ~ ~ E, E, - a, C ~ C . E , ~ _ "' N O C7' N: ~ ~ C' C~ ~ ~ ~ ,>~ U• ~, ~ a: ~ . ~~ 0.'S ~ ,~~ ~, ~~ ~~ N p, O) ~ N~ L d ~ C w O ~ O 'a 3 ' a: O ~, a ~ ~ ~ ~ ~ : ~ O p ~ .-.~ 'o O a Q U C~ ~ ~ o o O . o 3. ~ N' r// N' >: •~ 'N U Z ~ ~: o, a~' w o ~ c c c: 7 o N o o, a, O' j °~ ~ c. p, a CJ . ~ . : m: c, .. . :? m a (6 . . m. ~ w. , a, >, o. ~, ~, rn o Y m ~ N J g ~ ~ O. ~: a c c ~ a~ m >f O '~ ~' o 7 o, m a N (p, c ~ I Y N, _ c ' O n O '~ Z O o m ~ f6 ~ .. ~ ~, 3' 4 .D m. o. ~ T t, ~ 3..«.. m. . C ~ a iu ~: ~ a ~ s m m' ~: ~_: L, n - ~, ~ ~ N, a E ~ _ a, ~ m • c ~ a~ ~ ~«-. . M ~ ~ •- a~ rn ~ ~ ° a a 3' o o, c o. `- >, 3. ~' ~ Z ° : c: ~ ~ a ~ a , a a ~: 3, •3, o a~ . ~, a~, . N, ~: ~ "v. . 3 ca' ~' : o a ~, ~ ~' y 4 ,~, `~ o. 3, °~ m m' o' o w o O H a, o ~: ~, ~ o ~: fl, o ~: ~ o ca ~ o c ' o, ~, o o, c Y ~ o, o N: -a ~ ~: m ~ _ rn o aai. a ~. y ~ d ~ n a, ~, N ~ ~ U. . fl ~. ~' a i ,Q c t N a o ~ ~ , a' ~. ~: ~ rn o' ` ~ _ ~ ' ~ ~. c' o: t otf ~ _ ~ (6, N p O QS N 3~ . ,~~ ~ N . , y . , O_ ~, ~ . ~ N, c~ . , , 01 0- f6 N (0 O~ m (0' p' N' py , C~ U ~ ~ ~ 3~ N ~~ ~ y: ~: p~ - ~ U: c~ o~ ~ . ~ fl. ~ ~ ~~ ~, ._~ Q. ~ ~. ~ ~ ~ ~ 3 c , ~ ~ ~S or ~ ~~ c~ Y, ~~ ~, ~~ ° ~ ~ ~ _ o~ ~ p u~ . N ~ iL a ~ m, ~ -: a. a. a. Vl v, C O, Q. .Q, 4 a. t. ~~ ~ ~ y, 'y~ N. OJ, - >~ .aT ~~ L N 3 ~ O'er-' N~ ~ ~ ~ U• O U, ~ 4, ~, ~ a c~ m E~ ar a;, ::~ ~'~ f°. a~ o, .c. c, c ~ ~, U ~ I ° a m. m m ° o y ~ . = ~ ~~ O ~ - o. °~ m, c, a~~ c, m, F- w w: ~ 3. ~ ~ ~ ~ u~ o o ~. ~, E ~, N, -p >, I o, ~ ~ o _ - ~, ~, ~, °, a ~, = c, ~, I ~, ~, ~, o c, m f° m' m' ' a~' ~' a a o ~, ~, ~ ~ 3 ~ o i o j, ~ ~ ~ '~ ~ m, ~ ~ .~ ~, ~ ~ o a ~, i €, ~ •m ~ ' Y c ~ a a i -~ c; ~ ~' ~' ~' w cn; _ : O; O a; a; U ~' Q d Z ~ U ~ U U U U Q .._ - a w - m m m U ~ m ~~ ~ a m i , a U ~ o U p ~- U , , : , , , , , , , : , ~ W a U ~ ~ N M V~ CO h a0 _ O O) N M ~t ~ M r ~-; M O O ~- N_ N N N M N d' _N t!7 (O N_N I~ W O O N_ N N M M ~ N M~~ M M M) to M M M ~ W M M O M ~ C C w N "d' N ~ a0+ N U O ~ ~ ~ i ~ ~ i ~ ~ ~ M W a o J N +_~ la .. ~ O 0I C ~ y ~ O ~ ~ i >, rn O O p' c~~ o o E a a w U W ~ a a a U s ~ w a~ i j p ~ Q U a s • • Well History File APPENDIX Information of detailed nature that is not particularly germane io the Well Permitting Process but is part of the history file. To improve the readability of the We11 Nistory file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. mph-19.tapx Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Mar 12 13:40:57 2008 Reel Header Service name .............LISTPE Date . ...................08/03/12 Origin ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date . ...................08/03/12 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA scientific Technical services Library. scientific Technical services MPH-19 50029233710000 BP Exploration Alaska Sperry Drilling Services 12-MAR-08 MWD RUN 1 MWD RUN 2 JOB NUMBER: W-0005355566 W-0005355566 LOGGING ENGINEER: A. MUNRO D. RICHARDSO OPERATOR WITNESS: JERRY J. HABERTHUR SURFACE LOCATION SECTION: 34 TOWNSHIP: 13N RANGE: l0e FNL: FSL: 2954 FEL: 4132 FwL ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 70.00 GROUND LEVEL: 35.90 WELL CASING RECORD Page 1 ao~--/3~ ~l6 0 5~ MAD RUN 2 W-0005355566 • 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: mph-19.tapx OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.500 20.000 112.0 9.875 10.750 3814.0 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1,2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 2 ALSO INCLUDED COMPENSATED THERMAL NEUTRON (CTN), AZIMUTHAL LITHO- DENSITY (ALD), AND PRESSURE WHILE DRILLING (PWD). MAD DATA ACQUIRED WHILE POOH AFTER REACHING FINAL TD ARE PRESENTED SEPARATELY. 4. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED HOLE GAMMA RAY LOG RUN ON 10 DECEMBER 2007. THESE DIGITAL DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 9 JANUARY 2008, PER DENNIS URBAN (BP). LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 5. MWD RUNS 1,2 REPRESENT WELL MPH-19 WITH API#: 50-029-23371-00-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 7620'MD/4260'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR-TO-BIT DISTANCE. Page 2 • mph-19.tapx AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. PARAMETERS UTILIZED FOR POROSITY LOG PROCESSING: HOLE SIZE: 9.875~~ BIT MUD WEIGHT: 8.8-9.6 PPG MUD SALINITY: 200-600 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE File Header Service name... .......STSLIB.001 Service sub Level~Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............Lo Previous File Name.......ST5LI6.000 comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPM 224.5 7571.0 FET 224.5 7571.0 RPX 224.5 7571.0 RPD 224.5 7571.0 RPS 224.5 7571.0 GR 232.5 7575.5 ROP 286.5 7626.5 FCNT 3806.5 7529.5 NPHI 3806.5 7529.5 NCNT 3806.5 7529.5 DRHO 3806.5 7543.0 PEF 3806.5 7543.0 RHOB 3806.5 7543.0 BASELINE CURVE FO R SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 232.5 230.5 235.0 233.0 240.5 239.0 253.5 251.5 255.5 254.0 287.0 283.5 323.5 321.0 330.0 329.0 449.5 448.0 470.0 467.5 526.0 525.5 587.0 585.5 602.0 600.5 615.5 613.5 Page 3 mph-19.tapx 629.0 629.0 655.5 655.0 668.5 667.0 693.0 691.5 713.5 712.0 771.0 771.5 794.5 792.5 886.0 884.5 891.0 889.0 896.5 895.0 913.5 913.5 961.5 961.0 978.5 977.0 1048.0 1047.5 1089.5 1090.0 1116.0 1115.0 1122.5 1121.0 1134.5 1131.0 1195.0 1194.0 1198.0 1197.5 1272.5 1272.0 1287.0 1285.5 1435.5 1434.0 1592.0 1592.5 1770.5 1769.0 1795.5 1793.5 1814.5 1813.5 1824.0 1824.0 1839.0 1838.5 1877.5 1876.5 1914.5 1913.5 1916.5 1915.5 2038.5 2037.0 2063.5 2063.0 2112.0 2111.5 2141.0 2138.5 2186.5 2184.0 2267.5 2266.0 2498.0 2497.0 2659.5 2659.0 2682.5 2682.5 2706.0 2706.0 2726.0 2724.5 2746.0 2744.0 2751.5 2749.0 2952.0 2951.5 2956.5 2956.0 2988.5 2988.0 3025.5 3026.0 3063.0 3062.5 3090.0 3092.5 3096.5 3097.0 3140.0 3138.0 3146.5 3142.5 3312.5 3311.5 3330.5 3329.5 3369.5 3366.5 3456.5 3453.5 3555.5 3554.0 3603.0 3604.0 3623.5 3624.5 3699.0 3698.0 3777.0 3774.0 Page 4 mph-19.tapx 3790.5 3785.0 3815.0 3808.0 3831.0 3825.0 3869.0 3864.0 3891.5 3886.0 3907.5 3901.5 3921.0 3914.5 3938.5 3933.0 3967.5 3960.5 3974.5 3966.0 3986.5 3980.0 3994.0 3987.0 4012.5 4006.0 4066.5 4058.0 4098.0 4091.5 4133.0 4126.5 4156.5 4149.0 4161.5 4153.0 4173.5 4166.5 4292.0 4288.0 4305.5 4300.5 4316.0 4312.0 4332.5 4329.5 4373.5 4371.0 4378.5 4375.0 4419.0 4415.5 4432.5 4428.5 4446.0 4441.5 4448.0 4443.5 4452.0 4447.0 4454.0 4450.0 4472.0 4467.0 4478.5 4473.5 4491.5 4486.5 4536.0 4531.5 4601.0 4596.0 4631.5 4626.5 4648.0 4641.5 4697.0 4690.5 4729.5 4724.5 4750.5 4744.0 4771.0 4765.5 4777.5 4772.0 4803.0 4798.0 4826.5 4823.0 4838.0 4833.5 4845.5 4840.5 4870.5 4865.5 4890.5 4884.5 4923.5 4916.0 4948.0 4943.5 4960.5 4955.0 4970.5 4962.5 4985.5 4978.5 4990.5 4985.5 5020.0 5011.5 5046.5 5040.0 5060.5 5055.0 5071.5 5066.0 5088.0 5085.0 5091.0 5087.0 5101.5 5097.5 5123.5 5118.5 Page 5 mph-19.tapx 5137.5 5132.0 5145.0 5140.0 5150.0 5145.0 5151.5 5146.0 5296.5 5290.5 5321.5 5315.5 5349.0 5344.0 5353.5 5349.0 5361.5 5357.0 5369.5 5363.0 5385.5 5380.0 5417.5 5411.0 5420.5 5414.5 5422.0 5416.0 5425.5 5417.5 5432.5 5425.5 5438.5 5432.5 5456.5 5448.5 5484.0 5477.0 5492.5 5487.5 5513.5 5507.0 5521.5 5515.0 5524.5 5519.5 5535.0 5529.5 5546.0 5540.5 5551.5 5546.0 5562.5 5554.5 5566.0 5560.0 5568.5 5562.0 5572.0 5565.5 5574.5 5568.5 5582.0 5576.0 5589.5 5585.0 5602.5 5596.5 5608.0 5602.0 5611.0 5606.0 5618.5 5613.5 5627.0 5623.5 5641.5 5637.0 5668.0 5665.0 5686.0 5681.5 5803.0 5795.5 5812.5 5806.5 5821.5 5818.5 5826.5 5821.5 5838.5 5834.0 5884.0 5877.5 5892.0 5885.5 5901.0 5896.0 5935.0 5929.0 5954.0 5947.0 5977.0 5970.0 6057.0 6051.5 6086.0 6080.5 6153.5 6148.0 6161.5 6155.5 6194.5 6188.5 6201.5 6196.5 6210.0 6206.5 6223.0 6221.0 6270.0 6267.0 6278.0 6272.5 6329.5 6323.0 Page 6 6336.5 6379.0 6402.5 6427.5 6438.0 6450.5 6482.5 6493.5 6499.0 6520.0 6525.5 6533.5 6546.5 6557.0 6575.5 6587.0 6590.0 6616.0 6618.0 6620.5 6631.5 6643.0 6650.5 6667.5 6669.5 6702.5 6713.0 6716.5 6721.0 6734.0 6746.5 6753.5 6757.5 6766.5 6840.5 6859.0 6870.0 6876.5 6918.0 7626.5 6330.5 6373.0 6397.5 6421.5 6432.0 6446.0 6477.0 6489.0 6492.5 6512.5 6517.5 6526.0 6539.5 6549.5 6569.0 6579.0 6582.5 6608.5 6610.5 6612.0 6625.0 6636.0 6642.0 6661.0 6663.0 6694.5 6703.0 6706.0 6713.5 6724.0 6738.0 6744.5 6748.5 6758.0 6832.5 6850.0 6862.5 6869.0 6911.5 7620.0 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 2 REMARKS: MERGED MAIN PASS. mph-19.tapx MERGE TOP MERGE BASE 222.5 3825.0 3825.0 7621.0 Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Page 7 ~ ~ mph-19.tapx Name service order units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 RHOB MWD G/CC 4 1 68 12 4 DRHO MWD G/CC 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD B/E 4 1 68 ~ 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD PU-S 4 1 68 52 14 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 224.5 7626.5 3925.5 14805 224.5 7626.5 FONT MWD CP30 730.98 5211.73 1194.03 7434 3806.5 7529.5 NCNT MWD CP30 183538 354114 220312 7434 3806.5 7529.5 RHOB MwD G/CC 0.613 2.662 2.06289 7474 3806.5 7543 DRHO MWD G/CC -2.394 0.415 0.075053 7474 3806.5 7543 RPD MWD OHMM 0.08 2000 33.9385 14694 224.5 7571 RPM MWD OHMM 0.25 2000 29.5999 14694 224.5 7571 RPS MWD OHMM 0.06 890.12 19.6387 14694 224.5 7571 RPX MWD OHMM 0.31 2000 15.2458 14694 224.5 7571 FET MWD HR 0.14 77.04 1.44044 14694 224.5 7571 GR MWD API 12.86 115.63 66.2878 14687 232.5 7575.5 PEF MWD B/E 0.13 12.52 2.08235 7474 3806.5 7543 ROP MWD FPH 3.85 43242 228.687 14681 286.5 7626.5 NPHI MWD Pu-S 6.69 117.61 34.6817 7434 3806.5 7529.5 First Reading For Entire File..........224.5 Last Reading For Entire File...........7626.5 File Trailer Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLiB.002 Physical EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record Page 8 ~ ~ FILE HEADER FILE NUMBER: EDITED MERGED MAD Depth shifted and DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE NPHI FCNT NCNT RHOB DRHO -PEF RPS RPX RPD RPM FET GR RAT MERGED DATA SOURCE PBU TOOL CODE MWD REMARKS: mph-19.tapx 2 clipped curves; all MAD runs merged using earliest passes. .5000 START DEPTH STOP DEPTH 5857.0 7530.0 5857.0 7530.0 5857.0 7530.0 5870.5 7543.0 5870.5 7543.0 5870.5 7543.0. 5898.0 7572.0 5898.0 7572.0 5898.0 7572.0 5898.0 7572.0 5898.0 7572.0 5902.0 7576.0 5953.0 7627.5 MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE 2 1 3766.0 7621.0 MERGED MAD PA55. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Loggin Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MAD CP30 4 1 68 4 2 NCNT MAD CP30 4 1 68 8 3 RHOB MAD G/CC 4 1 68 12 4 DRHO MAD G/CC 4 1 68 16 5 RPD MAD OHMM 4 1 68 20 6 RPM MAD OHMM 4 1 68 24 7 RPS MAD OHMM 4 1 68 28 8 RPX MAD OHMM 4 1 68 32 9 FET MAD HR 4 1 68 36 10 GR MAD API 4 1 68 40 11 PEF MAD B/E 4 1 68 44 12 RAT MAD FPH 4 1 68 48 13 NPHI MAD PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading Page 9 a ~ mph-19.tapx DEPT FT 5857 7627.5 6742.25 3542 5857 7627.5 FONT MAD CP30 1032.42 3974.69 1345.45 2231 5857 7530 NCNT MAD CP30 206221 298905 231088 2231 5857 7530 RHOB MAD G/CC 1.91 2.739 2.23768 2235 5870.5 7543 DRHO MAD G/CC -0.033 0.332 0.0355387 2235 5870.5 7543 RPD MAD OHMM 3.66 1058.27 14.3062 2237 5898 7572 RPM MAD OHMM 3.25 180.01 11.7568 2237 5898 7572 RPS MAD OHMM 2.98 145.48 10.0576 2237 5898 7572 RPX MAD OHMM 3.02 90.66 8.47904 2237 5898 7572 FET MAD HR 3.12 38.46 15.947 2237 5898 7572 GR MAD API 31.34 202.42 87.8924 2236 5902 7576 PEF MAD B/E 1.47 5.36 2.18987 2235 5870.5 7543 RAT MAD FPH 0.06 334.05 284.618 2128 5953 7627.5 NPHI MAD PU-5 7.94 41.56 30.2528 2231 5857 7530 First Reading For Entire File..........5857 Last Reading For Entire File...........7627.5 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLI6.003 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.002 comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 222.5 3765.5 RP5 222.5 3765.5 RPM 222.5 3765.5 RPX 222.5 3765.5 FET 222.5 3765.5 GR 230.5 3772.5 OP 283.0 3825.0 $ LOG HEADER DATA DATE LOGGED: O1-DEC-07 Page 10 r~ SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: mph-19.tapx • Insite 74.11 Memory 3825.0 112.0 3825.0 .0 70.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMB ER DGR DUAL GAMMA RAY 163686 EWR4 ELECTROMAG. RESIS. 4 77613 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 13.500 DRILLER'S CASING DEPTH (FT): 112.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): . 9.40 MUD VISCOSITY (S): 110.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 250 FLUID LOSS (C3): 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): 7.500 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 7.701 68.0 MUD FILTRATE AT MT: 9.000 70.0 MUD CAKE AT MT: 4.700 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Log~iny Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order Units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MWDO10 OHMM 4 1 68 4 2 RPM MWDO10 OHMM 4 1 68 8 3 RPS MWDO10 OHMM 4 1 68 12 4 Page 11 mph-19.tapx RPX MWDO10 OHMM 4 1 68 16 5 FET MwD010 HR 4 1 68 20 6 GR MWDO10 API 4 1 68 24 7 ROP MWDO10 FPH 4 1 68 28 $ First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 222.5 3825 2023.75 7206 222.5 3825 RPD MWDO10 OHMM 0.08 1799.49 34.7586 7087 222.5 3765.5 RPM MWDO10 OHMM 0.27 1864.22 41.0973 7087 222.5 3765.5 RPS MWDO10 OHMM 0.27 890.12 27.9281 7087 222.5 3765.5 RPX MWDO10 OHMM 0.31 78.4 19.7792 7087 222.5 3765.5 FET MWDO10 HR 0.14 5.85 0.88885 7087 222.5 3765.5 GR MWDO10 API 11.9 112.38 64.5458 7085 230.5 3772.5 ROP MWDO10 FPH 3.85 5217.93 200.908 7085 283 3825 First Reading For Entire File..........222.5 Last Reading For Entire File...........3825 File Trailer service name... .......STSLIB.003 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File TyPe ................L0 Next File Name...........STSLI6.004 Physical EOF File Header Service name... .......STSLIB.004 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......ST5LI6.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPD 3766.0 7564.5 RPx 3766.0 7564.5 RPS 3766.0 7564.5 RPM 3766.0 7564.5 FET 3766.0 7564.5 GR 3773.0 7569.0 FCNT 3800.0 7523.0 PEF 3800.0 7536.5 Page 12 ~ ~ mph-19.tapx DRHO 3800.0 7536.5 RHOB 3800.0 7536.5 NCNT 3800.0 7523.0 NPHI 3800.0 7523.0 ROP 3825.5 7620.0 LOG HEADER DATA DATE LOGGED: 06-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7620.0 TOP LOG INTERVAL (FT): 3825.0 BOTTOM LOG INTERVAL (FT): 7620.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.1 MAXIMUM ANGLE: 87.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 053516 EWR4 ELECTROMAG. RESIS. 4 105242 CTN COMP THERMAL NEUTRON 231172 ALD Azimuthal Litho-Dens BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3814.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): 53.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 400 FLUID LOSS (C3): 7.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): 6.000 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .000 .O MUD FILTRATE AT MT: 7.000 65.0 MUD CAKE AT MT: 4.500 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Page 13 mph-19.tapx Frame Spacing.. ..... ............60 .lIN Max frames per record .............undefined Absent value ... ...................-999 Depth uni ts. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 FONT MwD020 CP30 4 1 68 4 2 NCNT MWD020 CP30 4 1 68 8 3 RHOB MWD020 G/CC 4 1 68 12 4 DRHO MWD020 G/CC 4 1 68 16 5 RPD MWD020 OHMM 4 1 68 20 6 RPM MWD020 OHMM 4 1 68 24 7 RPS MwD020 OHMM 4 1 68 28 8 RPX MWD020 OHMM 4 1 68 32 9 FET MWD020 HR 4 1 68 36 10 GR MWD020 API 4 1 68 40 11 PEF MwD020 B/E 4 1 68 44 12 ROP MWD020 FPH 4 1 68 48 13 NPHI MWD020 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3766 7620 5693 7709 3766 7620 FONT MWD020 CP30 730.98 5211.73 1193.76 7434 3800 7523 NCNT MWD020 CP30 183538 354114 220275 7434 3800 7523 RHOB MWD020 G/CC 0.613 2.662 2.06317 7474 3800 7536.5 DRHO MWD020 G/CC -2.394 0.415 0. 0751623 7474 3800 7536.5 RPD MWD020 OHMM 0.22 2000 31.9901 7598 3766 7564.5 RPM MWD020 OHMM 0.25 2000 18.4809 7598 3766 7564.5 RPS MWD020 OHMM 0.06 280.84 11.7961 7598 3766 7564.5 RPX MWD020 OHMM 1.08 2000 10.972 7598 3766 7564.5 FET MwD020 HR 0.15 77.04 1.89931 7598 3766 7564.5 GR MWD020 API 12.88 115.63 68.0042 7593 3773 7569 PEF MwD020 B/E 0.13 12.52 2.08368 7474 3800 7536.5 ROP MWD020 FPH 4.69 43242 254.682 7590 3825.5 7620 NPHI MWD020 Pu-s 6.69 117.61 34.6911 7434 3800 7523 First Reading For Entire File..........3766 Last Reading For Entire File...........7620 File Trailer Service name... .......STSL2B.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File TyPe ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLIB.005 Service sub Level Name... version Number...........1.0.0 Page 14 mph-19.tapx Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSL2B.004 comment Record FILE HEADER FILE NUMBER: 5 RAW MAD curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 2 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 5851.5 7523.5 FCNT 5851.5 7523.5 NCNT 5851.5 7523.5 PEF 5864.5 7536.5 DRHO 5864.5 7536.5 RHOB 5864.5 7536.5 FET 5892.5 7565.5 RPx 5892.5 7565.5 RPS 5892.5 7565.5 RPM 5892.5 7565.5 RPD 5892.5 7565.5 GR 5897.0 7569.5 RAT 5946.0 7621.0 LOG HEADER DATA DATE LOGGED: 07-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7621.0 TOP LOG INTERVAL (FT): 3766.0 BOTTOM LOG INTERVAL (FT): 7621.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: .O TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CTN COMP THERMAL NEUTRON ALD Azimuthal Litho-Dens BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3814.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): .00 MUD VISCOSITY (S): .0 MUD PH: .O .MUD CHLORIDES (PPM): 0 Page 15 mph-19.tapx FLUID Loss (C3): 0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 .O MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MAD021 CP30 4 1 68 4 2 NCNT MAD021 CP30 4 1 68 8 3 RHOB MAD021 G/CC 4 1 68 12 4 DRHO MAD021 G/CC 4 1 68 16 5 RPD MAD021 OHMM 4 1 68 20 6 RPM MAD021 OHMM 4 1 68 24 7 RPS MAD021 OHMM 4 1 68 28 8 RPX MAD021 OHMM 4 1 68 32 9 FET MAD021 HR 4 1 68 36 10 GR MAD021 API 4 1 68 40 11 PEF MAD021 B/E 4 1 68 44 12 RAT MAD021 FPH 4 1 68 48 13 NPHI MAD021 Pu-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5851.5 7621 6736.25 3540 5851.5 7621 FCNT MAD021 CP30 1032.42 3974.69 1345.92 2229 5851.5 7523.5 NCNT MAD021 CP30 206221 298905 231092 2229 5851.5 7523.5 RHOB MAD021 G/CC 1.91 2.739 2.2377 2236 5864.5 7536.5 DRHO MAD021 G/CC -0.033 0.332 0.0354759 2236 5864.5 7536.5 RPD MAD021 OHMM 3.66 1058.27 13.6624 2237 5892.5 7565.5 RPM MAD021 OHMM 3.25 180.01 11.4973 2237 5892.5 7565.5 RPS MAD021 OHMM 2.98 145.48 9.922 2237 5892.5 7565.5 RPX MAD021 OHMM 3.02 90.66 8.41545 2237 5892.5 7565.5 FET MAD021 HR 3.12 38.46 15.9274 2237 5892.5 7565.5 GR MAD021 API 31.34 202.42 87.9803 2235 5897 7569.5 PEF MAD021 B/E 1.47 5.36 2.18987 2236 5864.5 7536.5 RAT MAD021 FPH 0.06 334.05 284.747 2130 5946 7621 Page 16 • • mph-19.tapx NPHI MAD021 PU-S 7.94 41.56 30.2572 2229 First Reading For Entire File..........5851.5 Last Reading For Entire File...........7621 File Trailer Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/03/12 Origin ...................STS Tape Name. .... ........UNKNOWN continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date . ...................08/03/12 Ori in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF End Of LIS File 5851.5 7523.5 scientific Technical Services Scientific Technical Services Page 17