Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-137• Ir111~1c~e P'I~Oj~c~ 1~1~11 ~li~tory ~=il~ ~~v~r F'at~~ XNVZ_F Tl~tis p~~ge identifies those iten~ts that were not scanned durir7g the initial production scanning phase. They are available ire tl7e original file, may be scanned durir-tg a special rescan activity or are viewable by direct inspection of the file. - ~ ~ ~ Well History File Identifier Organizing (done) o,.o.,cea iuumiuiuum Re.~~~e~ea iiiuimuiiiiuu RES N olor Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: Maria Date: ~ /s/ ~ r Project Proofing II I II ~I II I I III I I III BY: Maria ~ Date: /s/ Scanning Preparation ~ x 30 = __~ + ~ =TOTAL PAGES__ (Count does not include cover sheet) BY: Maria Date: ~ ~, ~' ~ ~ /s/ ~~, Production Scanning Stage T Page Count from Scanned File: ~~ (Count does include cover heet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ ~ /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II'I II I II II I I III ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III II~III III IIII III 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA 1PASKA OIL AND GAS CONSERVATION C MISSION =w: 4` , REPORT OF SUNDRY WELL OPERATIONS - : -..:., 1. Operations Performed: J'A ❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Perforate ❑ Re -Enter Suspended Well ❑ Alter Casing ® Pull Tubing ❑ Stimulate - Frac ❑ Waiver ® Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Stimulate - Other ❑ Time Extension Jet Pump Conversion 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic 207 - 137 3. Address: ® Development ❑ Service 6. API Numbe P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50.029 23371 - 60 - 00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL 025906 MPH - 19L1 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Milne Point Unit / Schrader Bluff 11. Present well condition summary: Total depth: measured 10780' feet Plugs:(measured) None feet true vertical 4190' feet Junk: (measured) 6720' feet Effective depth: measured 10780' feet Packer: (measured) 6501' feet true vertical 4190' feet Packer: (true vertical) 4016' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 112' 20" 112' 112' 1490 470 Surface 3778' 10 -3/4" 36' - 3814' 36' - 2928' 5210 2480 Intermediate Production 6837' 7 -5/8" 34' - 6871' 34' - 4152' 6890 4790 Liner 4077' 4 -1/2" 6701' - 10778' 4091' - 4189' 8430 7500 Perforation Depth: Measured Depth: Slotted 7149' - 10737' feet True Vertical Depth: Slotted 4173' - 4186' feet Tubing (size, grade, measured and true vertical depth): 4 - 1/2 ", 12.6# L - 6705' 4093' Packers and SSSV (type, measured and true vertical depth): 7 - 5/8" x 4 - 1/2" TNT Packer 6501' 4016' 12. Stimulation or cement squeeze summary: Intervals treated (measured): A 2 2 2013 SCANNED !" APR Li Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 370 0 Subsequent to operation: 0 0 0 0 0 14. Att ❑Copies of Logs and Surveys run 15. Well Class after work: ❑ Exploratory ❑ Stratigraphic ® Development ❑ Service ® Daily Report of Well Operations ® Well Schematic Diagram 16. Well Status after work: ® Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact: Sean McLaughlin, 564-4387 Email: Sean.McLaughlin @bp.com N/A Printed Na Joe L s Title: Drilling Technologist ,,L Signature: (4 \ Phone: 564 - 4091 Date: 3/13/1,3 Form 10-404 Revised 10/201 BDMS MAR 15 2013ee v ��� /�'�, / Original Only , • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- OOX8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 2/15/2013 00:00 - 01:30 1.50 MOB P PRE PJSM FOR RIG MOVE OFF OF MPI -19 - NOTIFY PAD OPERATOR - NIGHT TOOLPUSHERS, NIGHT WSL AND DOYON SUPERINTENDENT ON LOCATION - PULL OFF OF MP 1 -19 AND MOVE TO MP H PAD -.KWF FOR MP H -19 EN ROUTE FROM PBU. 01:30 - 03:00 1.50 MOB P PRE 0130 -0300: ARRIVE MP H PAD - PULL ON TQ MP H -PAD - LAY MATS AND PREP TO BACK OVER WELL. - BACK OVER MPH -19 - WSL / TOOLPUSHER PRESENT. PAD OPERATOR NOTIFIED. 03:00 - 08:30 5.50 RIGU P PRE PJSM, RAISE DERRICK - BRIDLE. DOWN - SPOT RIG COMPONENTS. - RU CELLAR - RIG UP FLOOR. - LOAD PITS WITH 8.5 PPG 120 DEG SEAWATER. ACCEPT RIG AT 0600 HRS ON 02/15/2013 08:30 - 10:30 2.00 WHSUR P WHDTRE PJSM, RU CIRCULATING EQUIPMENT.. - RU TO HARD LINE TO FLOW BACK TANK - WARM LINE AND FILL TO TEST WITH DIESEL. 10:30 - 12:00 1.50 WHSUR P WHDTRE R/U KILL MANIFOLD IN CELLAR - CIRCULATING LINE TO WELLHEAD - PRESSURE TEST KILL MANIFOLD AND HARDLINE - CONTINUE ONLOADING 8.5 PPG - 120 DEGREE SEAWATER TO PITS. - PERFORM SPCC CHECKS AROUND THE RIG. SET UP COMMS. - CONDUCT RIG EVACUATION DRILL WITH DAY CREW AAR: ALL PRESENT AT PRIMARY MUSTER AREA GOOD RESPONSE TIME FROM THIRD PARTY CREWS AS WELL. W 12:00 13:00 1.00 WHSUR P HDTRE PJSM, PU DSM LUBRICATOR. RU TEST HOSES. - TEST LUBRICATOR TO 250 / 3500 PSI FOR F� CHARTED MIN. EACH. - PULL BPV WITH TESTED LUBRICATOR. SITP = 300 PSI. 8ICP = 325 PSI - LD LUBRICATOR PER DSM REPS. 13:00 - 13:30 0.50 KILLW P DECOMP PJSM, WELL KILL - WSL, TOOLPUSHER, RIG CREW IN ATTENDANCE. - REVIEW DDI WELL KILL SOP. DISCUSS VALVE ALIGNMENT, HAND HELD GAS DETECTOR WITH MAN AT FLOW BACK TANK. - DRILLER DISCUSSED ROLES AND RESPONSIBILITIES OF PERSONNEL. - MPU SECURITY AND PAD OPERATOR NOTIFIED OF GAS VENTING ON PAD. Printed 3/4/2013 3:21:25PM • • • Operation Summary Rep. Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 13:30 - 14:00 0.50 KILLW P DECOMP LINE UP TO KILL WELL VIA WELL KILL MANIFOLD IN CELLAR. - WSL & TOOL PUSHER VERIFY VALVE ALIGNMENT 14:00 - 19:00 5.00 KILLW P DECOMP - BLEED GAS FROM IAAT 325 PSI TO 0 PSI IN 21 MINUTES, NO FLUID RETURNS. WSL & TOOL PUSHER VERIFY VALVE ALIGNMENT FOR KILL. - QRCULATE 40 BBLS 8 5 PPG S _DOWN 2 7/8" TBG_. - - FLUIDATTIGERTANK - BULLHEAD 20 BBLS KWF DOWN TUBING: TUBING PRESSURE = 850 PSI, IA= 150 PSI OPEN CHOKE AND CIRCULATE 370 BBLS 8.5 PPG SEAWATER DOWN TUBING @ 5 BPM AND 850 PSI THROUGH LOWER GLM AT 6388' MD - HEAVY OIL RETURNS AT TANK & IN RETURN LINE - CONTINUE CIRCULATION KILL ATTEMPTING TO GET CLEAN RETURNS. PUMP 359 ADDITIONAL BBLS KWF AT 5 BPM @ 1000 PSI SLOW TO 3 BPM @ 380 PSI. - CLEANER RETURNS IN FINAL 50 BBLS PUMPED - PUMPS OFF 25 PSI @ 18:42 HRS. - AFTER 18 MINUTES BOTH TBG AND IA ON A VACUUM. - CONTINUE MONITORING WELL DURING NEXT PHASES - 471 BBLS KWF LOST TO FORMATION DURING KILL 19:00 - 20:30 1.50 WHSUR P DECOMP RIG DOWN MANIFOLD - BLOW DOWN LINES - RIG DOWN CIRCULATING LINES & KILL MANIFOLD - R/U SECONDARY KILL LINE 20:30 - 22:30 2.00 WHSUR P DECOMP PJSM WITH WELL SUPPORT AND RIG CREW TO SET TWC - M/U LUBRICATOR & TEST 250 PSI LOW AND 3500 PSI LOW FOR 5 MINS EACH , CHARTED - SETTWC -LAY DOWN LUBRICATOR 22:30 - 00:00 1.50 WHSUR P DECOMP PRESSURETESTTWC - PERFORM ROLLING TEST BELOW TWC PUMP DOWN IA@ 5 BPM AND 200 PSI FOR 10 MINS, CHARTED (103 BBLS KWF PUMPED) - TEST TWC FROM ABOVE : 250 PSI LOW PSI FOR 5 MINS , CHARTED - 191 BBLS 8.5 PPG SEAWATER LOST TO WELLAFTER WELL KILL TOTAL LOST TO WELL IN 24 HRS = 662 BBLS KWF Printed 3/4/2013 3:21:25PM • S ddr r/! sr' r/ f' r f,/!!', rAr,% do di J/„ r/%%> 1 /lFddrr,'F.,Yrr ;dddrr�"rr,/a,:r /; , ,Ffrfrr, / ;— f rrr,+"� % / "tVort�`i �;�ierlca . �LA��Aff ,,,/,/,„/„. Operation Summary Report , s ir Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4 00X8G E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect P Active datum: ORIG KELLY BUSHING ©21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 2/16/2013 00:00 - 01:00 1.00 WHSUR P DECOMP PRE -TOUR MEETING AND HANDOVER WITH NEW CREW - SPCC CHECKS - COMPLETE TEST FROM ABOVE OF TWC, - TEST TWC FROM ABOVE : 3500 PSI HIGH FOR 5 MINS , CHARTED PREPARE TO N/D TREE 01:00 - 02:30 1.50 WHSUR P DECOMP PJSM TO DRAIN AND N/D TREE & N/U BOP NIPPLE DOWN FMC 11" x 2- 9/16" , 5M ADAPTER FLANGE & 2- 9/16" TREE - FMC REP CLEAN AND INSPECT EUE 8RD HANGER THREAD - CONFIRM 9 -1/4 TURNS BY HAND CLEAR OLD `FREE FROM10ELLAR 02:30 - 05:00 2.50 WHSUR P DECOMP PJSM NIPPLE UP BOP `STACK N/U 13 -5/8" BOP 05:00 - 14:00 9.00 BOPSUR P DECOMP PJSM, TEST THREE PREVENTER BOP AND RELATED EQUIPMENT - FUNCTION TEST ACCUMULATOR SYSTEM - TEST BOP TO 250/3500 PSI FOR 5 MINUTES EACH TEST. - USED 2 -7/8" AND 4 -1/2" TEST JOINTS FOR 2 - 7/8" x 5" VBR. - TEST ANNULAR WITH 2 -7/8" TEST JOINT. - PERFORM ACCUMULATOR RECOVERY TEST. - TIME LOST BUMPING UP PRESSURE DUE TO INTERMITTENT LEAK IN TWC. - AOGCC, BOB NOBLE WAIVED STATES RIGHT OF WITNESS BOP TEST - MAINTAIN CONTINUOUS HOLE FILL TO THE IA DURING TEST AT 20 BPH , 8.5 PPG SEAWATER 14:00 - 15:00 1.00 BOPSUR P DECOMP BLOW DOWN LINES. RIG DOWN TEST EQUIPMENT. SUCK FLUID OUT OF BOP. 15:00 - 16:00 1.00 PULL P DECOMP RIG UP CENTRLIFT SPOOLER SHEAVE AND SPLASH GUARD FROM RIG FLOOR TO GROUND. 16:00 - 18:00 2.00 PULL P DECOMP PICKUP WELL SUPPORT OFF -SET LUBRICATOR. - MAKE UP TO TUBING HANGER. TEST TO 250/3500 PSI FOR 5 MINUTES. - PULL TWC. PULL AND LAY DOWN LUBRICATOR. 18:00 - 18:30 0.50 PULL P DECOMP PJSM ON PULLING 2 7/8" TBG HANGER TO FLOOR. VVSL, ibOLPUSHER, FMC REP, RIG CREW IN ATTENDANCE. - DISCUSSED WELL CONTROL, CONTINUOUS HOLE FILL, DISCONNECTING ESP CABLE FROM PENETRATER. Printed 3/4/2013 3:21:25PM • • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 18:30 - 19:30 1.00 PULL P DECOMP MU 2 -7/8" EUE LANDING JOINT WITH FOSV TO TBG HANGER. BOLDS PER FMC REP. - WSL VERIFY NO TRAPPED PRESSURE UNDER TBG HANGER. - PULL TBG HANGER OFF SEAT Cad 79K INCLUDES . 40K TOP DRIVE WT. MAX PULL 80K INCLUDES TOP DRIVE WT. PUW= 75K, SOW = 70K - PULL HANGER AND REMOVE FLAT GUARDS AND BANDS ON FIRST FULL JOINT, - CUT ESP & HEAT TRACE CABLE. - POSITION SLICK JOINT ACROSS BOPE. LD TBG HANGER. 19:30 - 20:30 1.00 PULL P DECOMP PJSM, - CLOSEANNULAR - ESTABLISH LOSS RATE: 19 BBLS LOST IN 20 MINS - BULLHEAD 40 BBLS KWF DOWN TUBING, 4 BPM = 700 PSI. - WSL / DRILLER VERIFY VACUUM AND NO TRAPPED PRESSURE. L/D LANDING JOINT, FOSV AND CIRC HOSE. - BLOW DOWN CEMENT LINE AND CIRC. EQUIPMENT. - OPEN ANNULAR. START FEEDING THE IA. - ESTABLISH STATIC LOSS RATE OF 59 BPH - CONTINUAL HOLE FILL 8.5 PPG SEAWATER AT -20 - 25 BPH. OA = 220 PSI 20:30 - 00:00 3.50 PULL P DECOMP PJSM TO PULL ESP / HEAT TRACE COMPLETION ASSEMBLY - POH WITH 2 -7/8" EUE 8RD TUBING, ESP GABLE & HEAT TRACE - LAYING DOWN TUBING - ATTACH ESP CABLE AND HEAT TRACE TO SPOOLING UNIT - POOH W/ ESP COMPLETION, HEAT TRACE , LAYING DOWN TBG CONTINUAL HOLE FILL WITH 8.5 PPG SEAWATER © -25 BPH 302 BBLS OF 8.5 PPG SEAWATER LOST IN 24 HRS 2/17/2013 00:00 - 04:00 4.00 PULL P DECOMP PRE -TOUR MEETING AND HANDOVER - SPCC CHECKS - POH WITH 2 -7/8" EUE 8RD TUBING, ESP CABLE & HEAT TRACE FROM -5634' MD - LAY DOWN TUBING 04:00 - 05:30 1.50 PULL P DECOMP POOH TO 4047' MD - PIPE AND CABLE COMING OUT VERY OILY - SET SLIPS, STAB FOSV - CIRCULATE A 20 BBL DEEP CLEAN PILL THROUGH LOWER GLM CURRENTLY AT -3850' MD - PUMP PILL AT 3.5 BPM AND 400 PSI - CLEAN AND CLEAR RIG FLOOR - ESTABLISH STATIC LOSS RATE OF 26 BPH Printed 3/4/2013 3:21:25PM • • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 05:30 - 14:00 8.50 PULL P DECOMP RESUME POOH WITH 2 -7/8" EUE 8RD TUBING, ESP CABLE AND HEAT TRACE FROM 4047' M REMOVE FLAT GUARDS, CLAMPS AND BANDS FROM TUBING. - WIPE OIL FROM OUTSIDE OF TUBING, ESP AND HEAT TRACE CABLES. - TUBING IS CLEAN ON THE INSIDE. A LITTLE INTERNAL CORROSION AND PITTING. - NO EXTERNAL CORROSION. - PUMP 20 BBL DEEP CLEAN PILL DOWN ANNULUS. - RECOVERED 5 PROTECTORS, 3FLAT GAURDS, & 56 LASALLE CLAMPS ON PUMP & MOTOR - RECOVERED 566- 6' FLAT GAURDS, 12- 4' FLAT GAURDS, 1A- 3' FLAT GAURDS, AND 1 BANDS_FROM HEAT TRACE CONDUCTED KICK WHILE TRIPPING DRILL. AAR. GOOD RESPONSE FROM CREWAND THIRD PARTY WORKERS. OA SHUT IN PRESSURE 240 PSI. OPEN OA TO FLOW BACK TANK. - BLEED OFF QUICKLY WITH VERY LITTLE FLUID. MAINTAIN OA OPEN WHILE POH. LOST 242 BBL SEAWATER TO WELL 14:00 - 17:00 3.00 PULL P DECOMP PJSM. LAY DOWN ESP PUMP AND MOTOR. - CUT CABLE. LAY DOWN PUMP AND MOTOR. 17:00 - 18:30 1.50 PULL P DECOMP PJSM. RIG DOWN ESP TOOLS. - RIG DOWN ESP TOOLS. - RIG DOWN SHEAVE AND SPLASH GUARD FROM DERRICK. - CLEAR AND CLEAN RIG FLOOR. 18:30 - 19:30 1.00 PULL P DECOMP PREPARE FOR PACKOFF CHANGEOUT - M/U PACKOFF RUNNING TOOL - THAW HARDLINE TO TIGER TANK WITH STEAM - 0/A PRESSURE GAUGE = 18 PSI 19:30 - 21:00 1.50 PULL P DECOMP MONITOR O/A PRIOR TO PULLING PACKOFF - O/A PRESSURE AT 30 PSI, SMALL AMOUNT OF FLUID BLED INTO BUCKET - RIG UP 0/A TO PORTABLE BLEED TANK - CALL TOWN ODE @ 1945, DECISION MADE THAT IF 0/A IS STILL HOLDING PRESSURE AFTER 1 HR , TO CHANGE PACKOFF AFTER MILL & SCRAPER RUN 21:00 - 21:30 0.50 PULL P DECOMP MAKE UP WEAR RING RUNNING TOOL - SHUT IN 0/A PRESSURE= 20 PSI - P/U RUNNING TOOLAND INSTALL WEAR RING, I.D.= 9" - THAW HARDLINE TO TIGER TANK WITH HEATERS AND 'HARDLINE BLANKETS' Printed 3/4/2013 3:21:25PM • • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date /me: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 21:30 - 00:00 2.50 CLEAN P DECOMP PJSM FOR MAKING UP MIL & SCRAPER BHA - PICKUP MILL AND SCRAPER ASSEMBLY (BHA #1) - 4 -3/4" JUNK MILL, 6 -1/2" DRESSING, 2X BOOT BASKETS, 7 -5/8" CASING SCRAPER BUMPER JAR, HYD OIL JAR, PUMP OUT SUB, X/O, & 9 DRILL COLLARS - BHA #1 OAL: 347.18' STATIC LOSS RATE = 10 BPH CONTINUAL HOLE OF 8.5 PPG SEAWATER AT —20 BPH LOSSES FOR THE DAY = 417 BBLS 8.5 PPG SEAWATER 2/18/2013 00:00 - 07:30 7.50 CLEAN P DECOMP PRE -TOUR MEETINGAND HANDOVER - SPCC CHECKS - RIH W/ 4- 3 /4'MI1-LAND 7 -5/8" SCRAPFR ASSEMBLY IyB 1A #_,j -RIH PICK UP 4" DRILL PIPE IN SINGLES. - AT 6690' RECORD SPR. 30 SPM 150 PSI. 40 SPM 270 PSI PICK UP WEIGHT 116K. SLACK OFF WEIGHT 94K - ROTATING WEIGHT 102KAT 40 RPM WITH 4K TORQUE. - TAG TOP OF LINER AT 6694' (RKB CORRECTION) 07:30 - 08:30 1.00 CLEAN P DECOMP PICKUP TOP DRIVE. - RUN IN SLOWLY WITH PUMP AT 5 BPM WITH 490 PSI. ROTATE AT 40 RPM - CONFIRM TAG AT TOP OF LINER AT 6694' - RUN IN AND TAKE WEIGHT AT 6713' WHEN NO -GO ON CLEAN -OUT BHA TAG TOP OF LINER. - ROTATE WITH NO -GO ON TOP OF LINER TO MARK TATTLETALE. - THE 4 3/4" MILL IS 17' INSIDE THE LINER AT 6711'. 08:30 - 10:30 2.00 CLEAN P DECOMP PUMP 40 BBL HIGH VIS SWEEP AT 5 BPM WITH 490 PSI. - DUMP SWEEP OVERBOARD. - MONITOR WELL PRIOR TO POH. 10:30 - 11:30 1.00 CLEAN P DECOMP PJSM POH 4" DRILL PIPE - REMOVE TOP DRIVE AND BLOW DOWN LINES. - LAY DOWN ONE JOINT OF 4" DRILL PIPE. - MONITOR WELL. - STATIC LOSSES TO WELL 10 BPH 11:30 - 12:00 0.50 CLEAN P DECOMP POH CASING SCRAPER BHATO5372'. - STAND BACK 4" DRILL PIPE 12:00 - 12:30 0.50 CLEAN P DECOMP CREW CHANGE. INSPECT EQIPMENT, SERVICE RIG. 12:30 - 15:30 3.00 CLEAN P DECOMP POH CASING SCRAPER BHA FROM 5372' TO BHA AT 347' - STAND BACK 4" DRILL PIPE. - FLUID LOST TO WELL WHILE POH = 10 BPH Printed 3/4/2013 3:21:25PM • • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 15:30 - 16:30 1.00 CLEAN P DECOMP PJSM ON LAY DOWN DRILL COLLARS, HANDLE BHA. - LAY DOWN 9 EA 4 3/4" DRILL COLLARS. - LAY DOWN MILL AND SCRAPER CLEAN OUT BHA. - INSPECT TATTLETALE ON NO-GO. CLEAR INDICATION OF CONTACT WITH THE LINER TOP. CLEAN BOOT BASKETS. NOTHING RECOVERED - NO INDICATION OF DAMAGE OR WEAR ON MILL. 16:30 - 17:30 1.00 PULL P DECOMP PREPARE FOR PACKOFF CHANGEOUT M/U RUNNING TOOL - PULL WEAR RING MAKE UP PACKOFF PULLING TOOL - MONITOR 0/A- 17:30 - 20:00 2.50 PULL P DECOMP MONITOR 0/A PRIOR TO PULLING PACKOFF - 0/A STILL FLOWING SMALL AMOUNTS OF FLUID & GAS INTO BUCKET -CALL TOWN ODE @ 1945, DECISION MADE NOT TO CHANGE MANDREL PACKOFF AND MOVE FORWARD WITH THE REST OF THE WELL PLAN - LAY DOWN PULLING TOOL - RESET WEAR RING, I.D.= 9" 20:00 - 21:00 1.00 WHSUR P DECOMP - RESET LOCK DOWN SCREWS, AND TEST FMC 7 -5/8" MANDREL PACKOFF VOID AND SEALS TO 3800 PSI FOR 30 MINS - BEGIN TEST AT 3843 PSI. LOST 138 PSI IN FIRST 15 MINS AND 54 PSI IN 2ND 15 MINUTES. 21:00 - 00:00 3.00 EVAL P DECOMP PJSM, PU / MU 7 5/8" HES CHAMP PACKER PER HES REP. - WSL, TOOLPUSHER, HES REP. RIG CREW IN ATTENDANCE. - OD. OF HES 7 5/8" CHAMP PACKER = 6.51" - RIH ON 4" HT -38 DRILL PIPE FROM DERRICK. - RIH TO 6619" MD. CONTINUAL HOLE FILL WITH 8.5 PPG SEAWATER AT 12 BPH 389 BBLS KWF LOST FOR THE DAY 2/19/2013 00:00 - 02:00 2.00 EVAL P DECOMP PRE -TOUR MEETING AND HANDOVER - SPCC CHECKS - RIH W/ 7 5/8" HES CHAMP PACKER FROM -4000' MD CENTER OF ELEMENT. - RIH ON 4" HT -38 DRILL PIPE FROM DERRICK. - RIH TO -6620" MD. 02:00 - 02:30 0.50 EVAL P DECOMP SET 7 -5/8" HES CHAMP PACKER - OBTAIN PARAMETERS AT 6587' MD - PUW= 107 K , SOW= 93 K - WORK PACKER AT SET DEPTH OF 6613' MD - SET DOWN 5' & ROTATE 2 TURNS, PACKER SET AT 6613' MD Printed 3/4/2013 3:21:25PM • • ,+ �''f��f.?F` /f"rr. ri ,.�'�isrrr.�'„f„f {f'ii North America - ALP, i � - Operation summary Repot Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date /me: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 02:30 - 05:00 2.50 EVAL P DECOMP PJSM, MIT -IA, 7 5/8" L -80 29.7 # CSG BY4" DRILL PIPE ANNULUS. - CONFIRM VALVE ALLIGNMENT PRIOR TO TEST PUMPED 36 STKS ( 3 BBLS) TO / 3,350 PSI FOR 30 CHARTED MINUTES. DISCUSS W/ TOWN RWO ENGINEER. - MIT -IA TEST, MEETS BP STP CRT -AK- 10-45, CRITERIA. - RECEIVED PERMISSION TO PROCEED FROM WTL. - BLEED OFF PRESSURE. " 0 " READING. ESTIMATE 2.5 BBLS BLED BACK VERIFIY NO TRAPPED PRESSURE BELOW PACKER. FILLED TBG WITH KWF. RELEASED CHAMP - PACKER - PER HES REP. ALLOW PACKER' ELEMENTS TO RELAX - MONITOR WELL FOR 10 MIN. WITH CONTINUAL HOLE FILL. - SEE ATTACHMENTS 05:00 - 12:00 7.00 EVAL P DECOMP POH WITH 7 -5/8" HES CHAMP PACKER POH WITH CHAMP PACKER ON 4" HT -38 DP - LAYING DOWN DRILL PIPE 1 x 1 IN PIPE SHED. - FLUID LOST TO HOLE WHILE POH 10 BPH 12:00 - 12:30 0.50 EVAL P - DECOMP CREW CHANGE. SERVICE RIG AND INSPECT EQUIPMENT. 12:30 - 13:30 1.00 EVAL P DECOMP POH WITH CHAMP PACKER ON 4" HT -38 DP - LAYING DOWN DRILL PIPE 1 x 1 IN PIPE SHED. - FLUID LOST TO HOLE WHILE POH 10 BPH - LAY DOWN CHAMP PACKER.. - LAY DOWN PACKER RUNNING TOOLS. 13:30 - 14:30 1.00 EVAL P DECOMP CLEAN AND CLEAR FLOOR. - CHANGE BAILS TOP DRIVE - PICK UP WEAR RING PULLING TOOL. PULL AND LAY DOWN WEAR RING. 14:30 - 18:00 3.50 RUNCOM P RUNCMP RIG UP TUBING RUNNING TOOLS. - RIG UP TORQUE TURN EQUIPMENT. - PULL SLB I -WIRE SPOOL TO RIG FLOOR - RIG UPI -WIRE SPOOLER AND SHEAVES. 18:00 - 18:30 0.50 RUNCOM P RUNCMP PJSM WITH RIG CREW, HALLIBURTON, SCHLUMBERGER, WSLS - DISCUSS SPECIFIC HAZARDS, WORKING WITH SERVICE HANDS ON A CROWDED RIG FLOOR 18:30 - 20:30 2.00 RUNCOM P RUNCMP P/U 4 1/2" 12.6# L -80 TC -11 JET PUMP COMPLETION BHA - M/U MULE SHOE JOINT, XN WITH RHC -M PLUG, X- NIPPLE - M/U HES 7 5/8" X 4 1/2" TNT PACKER - BAKER LOCKALL CONNECTIONS BELOW PACKER - SLB INTAKE GAUGE, HES SLIDING SLEEVE, SLB DISCHARGE GAUGE 20:30 - 23:00 2.50 RUNCOM P RUNCMP M/U AND TIE IN I -WIRE TO INTAKE AND DISCHARGE GAUGES - MAKE SERVICE SPLICES AND TEST TO 5000 PSI Printed 3/4/2013 3:21:25PM • • Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 23:00 - 00:00 1.00 RUNCOM P RUNCMP RIH WITH 4 1/2" 12.6# L -80 TC -11 JET PUMP COMPLETION INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM BHA TO 807' -OA =0 PSI 24 HOUR FLUID LOSS = 322 BBLS 8.5 SEAWATER - MAINTAIN CONTINUOUS HOLE FILL AT 12 BPH 2/20/2013 00:00 - 01:00 1.00 RUNCOM P RUNCMP PJSM, RUNNING PACKER AND I -WIRE WITH SERVICE HANDS - MAKE EQUIPMENT AND SPCC CHECKS - MAINTAIN CONTINUOUS HOLE FILL AT 12 BPH 01:00 - 09:30 8.50 RUNCOM P RUNCMP - I4IH WITH 4 1/2" 12.6# L -80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM 807' TO 4861' 09:30 - 10:00 0.50 RUNCOM P RUNCMP - KICK WHILE TRIPPING DRILL. - GOOD RESPONSE FROM CREW. - STAB SAFETY VALVE, SIMULATE CLOSING AND SECURING WELL. - SAFETY STAND DOWN WITH CREWAND WSL. - DISCUSS INCIDENT ON DOYON 14. 10:00 - 12:00 2.00 RUNCOM P RUNCMP - RIH WITH 4 1/2" 12.6# L -80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM 4861' TO 3006' LOSSES TO WELL WHILE RIH = 18 BPH 12:00 - 12:30 0.50 RUNCOM P RUNCMP CREW CHANGE. SERVICE RIG, INSPECT EQUIPMENT 12:30 - 15:00 2.50 RUNCOM P RUNCMP - RIH WITH 4 1/2" 12.6# L -80 TC -II JET PUMP COMPLETION - INSTALL CANNON CLAMPS ON EVERY COLLAR. - TOTAL I -WIRE CLAMPS = 155 EA 2' CANNON AND 5 EA HALF CANNON - CHECK CONTINUITY OF I -WIRE EVERY 1000' - RIH FROM 3006' TO 6723' - TAG TOP OF LINER PBR AT 6694' - RUN IN AND TAG XO BUSHING ON LINER HANGER AT 6726'. - POH. LAY DOWN TWO JOINTS. - TOTAL JOINTS 4 1/2" 12.6# L -80 TC -II RUN = 153 - MAKE UP TORQUE 3850 FT /LBS. NO REJECTS - FINAL PICK UP WEIGHT 94K. SLACK OFF 85K Printed 3/4/2013 3:21:25PM S • North America - ALA, § - , Operation Summary Report ''r' / 5 55, ////://,-/./ , // Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name/No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor. DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (m) 15:00 - 17:30 2.50 RUNCOM P RUNCMP MAKE UP FMC 4 -1/2" X 11" GEN V TUBING HANGER. - HANGER HAS 4 1/2" TC -II LIFT THREADS AND 2.84' OF BLAST RINGS INSTALLED ON PUP JT. - PASS I -WIRE THROUGH TUBING HANGER AND SECURE FROM BELOW WITH SWEDGE -LOCK. TEST SWEDGE -LOCK ON HANGER TO 5000 PSI - LAND TUBING HANGER. MULE SHOE AT 6705'. WITH 11' INSIDE LINER. -. R/D CASING pQUIPMENT PUWT = 94K, SOWT = 85K - TOTAL CANNON CLAMPS = 155, HALF / CLAMPS = 5 17:30 - 18:00 0.50 RUNCOM P `t , RUNCMP LAND HANGER, REP PRESENT - RUN IN LOCK DOWN SCREWS - LID LANDING JOINT 18:00 - 20:00 2.00 RUNCOM P RUNCMP R/U CELLAR LINES TO CHOKE MANIFOLD IN k CELLAR TEST LINES, 250 / 3500 PSI, 5 MIN, = R/D SLB I -WIRE EQUIPMENT - ESTABLISH REVERSE CIRCULATION RATES, 4 BPM = 130 PSI 20:00 - 22:30 2.50 RUNCOM P RUNCMP PJSM FOR PUMPING CORROSION INHIBITOR WITH ALL HANDS AND TRUCK DRIVERS - PUMP 100 BBLS OF 120 DEGREE 8.5 SEA WATER DOWN IA, RETURNS TO PITS - PUMP 180 BBLS OF 8.5 CORROSION INHIBITED SEAWATER DOWN IA - 3 BPM = 120 PSI, PUMPED AT LOWER RATE TO MINIMIZE LOSSES - 152 BBL LOSS WHILE REVERSE CIRCULATING - PUMP 4 BBLS DOWN TUBING TO VERIFY OPEN BEFORE DROPPING BALL AND ROD 22:30 - 00:00 1.50 WHSUR P RUNCMP MONITORWELLUNTILSTABLE - DROP BALL AND ROD ASSY - PRESSURE UP ON TUBING TO 3200 PSI - OBSERVE PACKER SET AT GAUGE AROUND 3100 PSI - TEST 4 1/2" 12.6# L -80 TC -11 TUBING TO 3200 PSI, 30 MINUTES - 24 HOUR FLUID LOSS = 226 BBLS 8.5 ) SEAWATER 2/21/013 00:00 - 01:30 1.50 WHSUR P RUNCMP PJSM, PERFORM SPCC AND EQUIPMENT CHECKS - TEST 4 1/2" 12.6# L -80 TC -11 TUBING TO 3200 PSI, 30 MIN, CHARTED - BLEED TUBING BACK TO 1500 PSI - TEST IA- PACKER TO 3200 PSI, 30 MIN, CHARTED - CALL WTL WITH RESULTS, RECEIVE AUTHORIZATION TO PROCEED - BLEED OFF TUBING AND SHEAR DCK VALVE - PUMP DOWN TUBING AT 2.5 BPM = 1060 PSI, DOWN IAAT 2.5 BPM = 700 PSI TO VERIFY THAT DCK VALVE IS OPEN, GOOD Printed 3/4/2013 3.21.25PM • • w Operation Summary Report ' p rY P Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00X8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/lime: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor DOYON DRILLING INC. UWI 00000070.32 00000149 53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 01:30 - 02:00 0.50 WHSUR P RUNCMP VAC OUT BOP STACK - FMC REP, DRY ROD IN TWC 02:00 - 02:30 0.50 WHSUR P RUNCMP TEST TWC FROM BELOW, 1000 PSI, 10 MIN, CHARTED, GOOD TEST - ATTEMPT TEST FROM ABOVE, UNSUCCESSFUL 02:30 - 04:00 1.50 WHSUR P RUNCMP VAC OUT BOP STACK - RINSE, CLEAN AND VAC OFF TOP OF TWC TEST TWC FROM ABOVE, 250 / 3500 PSI, 5 MIN CHARTED 04:00 - 06:00 2.00 BOPSUR P RUNCMP PJSM. NIPPLE DOWN BOP. - NIPPLE DOWN BQPSTACK - VAC OUT BOP STACK AN,D BLOW DOWN - -- LINES VISUALLY INSPECT TWC. NO EVIDENCE OF REASOI,V FOR FAILED TEST. 06:00 - 08:30 2.50 WHSUR P ,.RUNCMP NIPPLE SPOOL - CLEAN AND INSPECT FMC HANGER SEALS - HEAT UP, CLEAN AND INSPECT ADAPTER - NIPPLE UP ADAPTOR SPOOL 08:30 - 11:00 2.50 WHSUR P ` t RUNOMP TERMINATE I -WIRE PASS I -WIRE THROUGH ADAPTOR SPOOL -PORT. i - TERMINATE I -WIRE AND TEST SAME. - PRESSURE TEST ADAPTOR VOID TO 250 PSI FOR 5 MINUTES AND 5000 PSI FOR 30 MINUTES. 11:00 - 14:30 3.50 WHSUR P RUNCMP PJSM. NIPPLE UP TREE. - NIPPLE UP 4- 1/16" CIWTREE - TEST TREE TO 250/5000 PSI FOR 5 MINI ITFS EACH. - PRESSURE HAD TO BE BUMPED UP SEVERAL TIMES. NO VISIBLE SURFACE LEAKS. 14:30 - 16:30 2.00 WHSUR P RUNCMP PJSM. RIG UP LUBRICATOR - INSTALL LUBRICATOR ON TREE AND PRESSURE TEST 250/3500 PSI 5 MINUTES EACH. - PULL TWC AND LAY DOWN. - RIG DOWN LUBRICAI OR AND HANG OFF SAME. 16:30 - 22:00 5.50 WHSUR P RUNCMP PJSM. FREEZE PROTECT WITH HOT OIL PUMP. - RIG UP LITTLE RED HOT OIL PUMP TRUCK AND LINES. - TEST LINES TO 250/3500 PSI FOR 5 MINUTES EACH. - PUMP 105 BBL DIESEL AT 80 DEG DOWN IA AT 1.5 BPM, ICP = 300, FCP = 600 PSI - ALLOW DIESEL TO 'U' TUBE FOR 1 HOUR - IA = 60 PSI, TUBING = 60 PSI - BLEED OFF 1 BBL, PRESSURE IS STILL STABLE AT 60 PSI, - DISCUSS OPTIONS WITH TOWN ENGINEER 22:00 - 23:30 1.50 WHSUR P RUNCMP PJSM, M/U WELL SUPPORT LUBRICATOR - TEST LUBRICATOR, 250 / 3500 PSI, 5 MIN, CHARTED - SET BPV - RID WS LUBRICATOR Printed 3/4/2013 3:21.25PM • • r r c rr /r riirsrrrrrr!i/r/,gri/rrr'Fiis,, North America - ALAXA` B r' " r �� r Operation Summary Report /;' , Common Well Name: MPH -19 AFE No Event Type: WORKOVER (WO) Start Date: 2/15/2013 End Date: X4- 00x8G- E:DRILL (2,080.00 ) Project: Milne Point Site: M Pt H Pad Rig Name /No.: DOYON 16 Spud Date/Time: 11/29/2007 12:00:00AM Rig Release: 2/21/2013 Rig Contractor: DOYON DRILLING INC. UWI: 00000070.32 00000149.53W Zone: 04 Sect: P Active datum: ORIG KELLY BUSHING @21.34m (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (m) 23:30 - 00:00 0.50 WHSUR P RUNCMP USE HOT OIL PUMP TO TEST BPV FROM BELOW - 1000 PSI, 10 MIN, CHARTED - RIG DOWN CELLAR LINES - RELEASE RIG AT 24:00 HOURS Printed 3/4/2013 3:21:25PM f • Tree: 4 1/16" - 5M MPU H-19/./ Orig. DF elev. = 70.2' (Doyon 14) Wellhead: 11" 5M FMC Gen 5 ri 2 Bust Orig. GL elev.= 34.1' (Doyon 14) w/ 4 1/16" FMC Tbg Hgr , 4.5" TC -II R "es Orig. DF elev.= 70' (Doyon 14) T &B lift threads, 4.5" CIW 'H' Profile k Casing tested to 3350 psi from 6620' 115` during the 2/21/13 RWO 1 KOP @ 720' Max. hole angle = 70° - 87° from 3218' to 7 2 3 9 ' ° ; Camco 4 1/2" x 1 " 1 2471 ` L -1 Max hole angle =71 ° -95° KBG -2 Gas lift mandrel from 6859' to 10,780' I -Wire 10 3/4 ", 45.5 #, L -80 Btc. 3814' A ■ 14 1/2" 12.6 #, L -80, TC -ll production tubing (drift ID = 3.833 ", cap. = 0.0152 bpf) 7 5/8" 29.7 #, L -80, BTC production casing (drift ID = 6.75 ", cap. = 0.0383 bpf) (cap with Tbg inside = 0.0262 bpf) ' ■ ' I 1 SLB NDPG -C Discharge Gauge 6411' I ; i 1.,-', _ ' 3.958" ID j "` " ° "`, HES 4 1/2" XD Duro Sleeve 6423` 3.813 Packing Bore ID SLB NDPG -C Intake Gauge 6433' 3.958" ID HES 7 5/8" x 4 1/2" TNT Packer 6501' I Note: Flatguard in hole depth unknown Imo= HES 4 1/2" X Nipple 7' x 1 1/2" see diagram in well file. 3.813 Packing Bore ID 1 6582' mom HES 4 1/2" XN Nipple 6655' I 3.813 Packing Bore ID / 3.725" No - Go ID Baker Production Liner Hanger Assembly 0 . 5.5" x 7.63" - "HR" ZXP Liner Top Pkr. WLEG (bottom 11' inside Lnr Tie Back) 6705' 1 5.5" - "RS" Packoff Seal Nipple - 6701'' 7.63" x 5.5" - Flex -Lock Liner Hanger - 6720' NM MI MI MI 4.5" shoe @ 10737' Milled csg. window from 6871' - 6882' / NI PE DWI Wil •"mow, Whipstock set in Mother Bore y Bop - 6870' Bottom - 6884' 4.5" x 6.38" x TAM Swell Pkrs. 7708' 8128' 9457' 10099' 4.5" 12.6# L -80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193' - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972' 7" casing shoe 7584' DATE REV. BY COMMENTS MILNE POINT UNIT 12/19/07 REH Drill and Complete w /ESP by Doyon 14 WELL H - 12/19/07 REH ESP Changeout by Nabors 3S API NO: 50 - 233710000 2/21/13 Hulme Convert to Jet Pump - Doyon 16 BP EXPLORATION (AK) • x> ~~ w.~ ;. ...~ d .. ,~ ,. w. !:i ~ F i h~;;~ ,5s ~k; k ~` ~ {{~ yg MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc DATA SUBMITTAL COMPLIANCE REPORT 12/9/2008 Permit to Drill 2071370 Well Name/No. MILNE PT UNIT SB H-19L1 Operator BP EXPLORATION (ALASKA) INC MD 10780 TVD 4190 Completion Date 12/19/2007 Completion Status 1-OIL Current Status 1-OIL REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: DIR, GR, RES, GYRO, NEU, DEN, GeoTap, IFR/CASANDRA, USIT, Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Ty Med/Frmt Number Name Scale Media No pt LIS Verification p~ED C Lis 16057 Induction/Resistivity I 224 10727 Open 3/24/2008 LIS Veri, RPS, FET, RPD, RPX, RPM, GR, ROP, FNMT, NCNT, RHOB, NPHI, PEF, DRHO 224 10727 Open 3/24/2008 LIS Veri, RPS, FET, RPD, RPX, RPM, GR, ROP, FNMT, NCNT, RHOB, NPHI, PEF, DRHO Wel! Cores/Samples Information; Name ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? Y71V'" Analysis ~j Y / N Received? Comments: Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~/ N Formation Tops ~N Compliance Reviewed By: Date: API No. 50-029-23371-60-00 UIC N Directional Survey (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments STATE O F ALAS KA~ R ~ ^ ~' ~~ ALAS IL AND GAS CONSERVATION COMM ON (/ REPOOF SUNDRY WELL OPERA ONS APR p 2 2008 1. Operations Performed: ^ aS~(8 ~Ij & G8S li0fi "jS Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Ent~rB~N~~nde We e d W@ll '~~JJ ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown Change Out ESP ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 207-137 p 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23371-60-00'" 7. KB Elevation (ft): 70, ~ 9. Well Name and Number: MPH-19L1 a 8. Property Designation: 10. Field /Pool(s): ~ ADL 025906' Milne Point Unit / Schrader Bluff 11. Present well condition summary Total depth: measured 10780 ~ feet true vertical 4190 , feet Plugs (measured) None Effective depth: measured 10780 ` feet Junk (measured) 6720' true vertical 4190 ' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 112' 20" 112' 112' 1490 470 Surface 3778' 10-3/4" 3814' 2928' 5210 2480 Intermediate Production 6837' 7-5/8" 6871' 4152' 6890 4790 Liner 4077' 4-1/2" 6701' - 10778' 4091' - 4189' 8430 7500 Perforation Depth MD (ft): Slotted 7149' - 10737' Perforation Depth TVD (ft): Slotted 4173' - 4186' 2-7/8", 6.5# L-80 6603' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7-5/8" x 5-1/2" HR ZXP 6720' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Da il Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: 423 197 57 420 315 Subsequent to operation: 501 205 77 300 295 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ^ Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. undry Number or N/A if C.O. Exempt: Contact Paul Hanson, 564-4195 N/A Printed Name Sondra Stewman Title Drilling Technologist Si ' ature Prepared By Name/Number Phone 564-5667 DateO~'Oj -C~ Sondra Stewman 564-4750 Form 10-404 Revised 04/2006 n Submit Original Only i10! Tree: 2 9/16" - 5M MP U H -19\~..1 Orig. DF elev. = 70.2' (Doyon 14) ` Wellhead: 11" 5M FMC Gen 5 (Doyon 14) Orig. GL elev.= 34.1 w/ 2 7/8" FMC Tubing Hanger ,EUE Orig. DF elev.= 70' (Doyon 14) lift threads, 2.5" CIW H BPV profile 20" 91.1 ppf, H-40, cond. 115' KOP @ 720' Camco KBMM GLM 162` 2-7/8" x 1" Max. hole angle = 70° - 87° from 3218' to 7239' L-1 Max hole angle=71 °-95° from 6859` to 10,780' 10 3/4", 45.5#, L-80 Btc. 3814' Camco KBMM GLM 6388' " ~~ " x 1 2-7/8 8 rd EUE tbg.. 2 7/8" 6.5 ppf L-80 2-7/8" XN nipple 6535' " , , 2.250 ID (drift ID = 2.347") Centrilift Pump 6547' SXD / 142P23 7 5/8" 29.7#, L-80, Btrc. production casing - Gas Separator 6664' ( drift ID = 6.75", cap. = 0.0383 bpf) GRSFTXARH6 Tandem Seal Sections 6569' GSB3DBFERHLSS/CVH6PFSA Motor- KMH/190hp 6583' 2415 volt / 48 amp Note: Flalgaurd in hole depth unknown T x 1 112" see diagram in well file. Baker Production Liner Hanger Assembly 5.5"x 7.63"- "HR" ZXP Liner Top Pkr. 5.5"- "RS" Packoff Seal Nipple - 6701' 7.63" x 5.5"- Flex-Lock Liner Hanger - 6720` Milled csg. window from 6871 ` - 6882' Whipstock set in Mother Bore Top - 6870` Bottom - 6884' DATE REV. BY COMMENTS 12/19/07 REH Drill and Complete w/ESP by Doyon 14 12/19/07 REH ESP Changeout by Nabors 3S Pumpmate XT-0 Sensor 6600' w/ Centralizer 4.5" shoe @ 10737' ~ 4.5" x 6.38" x TAM Swell Pkrs. 7708' 8128' 9457' 10099' 4.5" 12.6# L-80 IBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193' - 9401' 13 jts. 9532' - 10044' 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972' 7" casing shoe 7584' MILNE POINT UNIT WELL H-19~ BP AMERICA Page 1 of 2 Operations Summary Report Legal Well Name: MPH-19 Common W ell Name: MPH-19 Spud Date: 11/29/2007 Event Nam e: WORKO VER Start : 2/28/2008 End: 3/3/2008 Contractor Name: NABOBS ALASK A DRI LLING I Rig Release: 3/3/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours i Task Code NPT Phase Description of Operations 2/27/2008 18:00 - 00:00 6.00 RIGD P Rig released from MPC-24 C~ 18:00 hours. Prep for rig move to MPH-19. Scope and lay down derrick, pick up herculite berms. 2/28/2008 00:00 - 02:30 2.50 RIGD P PRE Rig down and prep shop and camp formove. 02:30 - 04:30 2.00 MOB P PRE Rig carrier an modules depart MPC Pad for move to MPH Pad. 2 Hrs enroute to new location. 04:30 - 12:30 8.00 RIGU P PRE Arrive on MPH pad. Spot carrier on well 19. Lay herculite and spill berms. Position pit and pipe shed modules. Hook up all lines. 12:30 - 14:00 1.50 RIGU P PRE Raise and scope Derrick. Continue to hook up rig components. Re-install elevator to pits. 14:00 - 21:00 7.00 KILL P DECOMP Rig Accepted C~ 14:00. Bob Noble w/ AOGCC waived state's right to witness upcoming BOPE test. Rig up tree for circulation kill. RU hardline to Tiger tank. Pressure test hardline, tree to 2500 psi. Test hardline downstream of choke (to Tiger Tank) to 500 psi. 21:00 - 22:00 1.00 KILL P DECOMP PUMU lubricator, tested with diesel to 500 psi. Pull BPV, and lay down lubricator. 22:00 - 00:00 2.00 KILL P DECOMP Open well, SITP 370 psi, bleed to 40 psi start pumping at 3BPM ~ 280 psi. Pumped 45 bbls of 140 deg. seawater down the tubing with no returns, close choke and bullhead 65 bbls into formation. 2/29/2008 00:00 - 02:00 2.00 KILL P DECOMP Pumped 100 bbls the long way with no returns, lines to tiger tank iceing up. Bullhead 300 bbls seawater down IA at 46PM @ 130 psi. Tubing and IA on Vacuum. 02:00 - 06:00 4.00 KILL P DECOMP Set TWC, inject 100 Bbls down IA to test TWC, 3BPM, 150 psi (pump pressure). Attempt to test from above. Slight pressure loss. Call for WS tech. Pull TWC w/ Lubricator, re-dress TWC. Run TWC and test from above to 3500 psi for 20 minutes. 06:00 - 09:00 3.00 WHSUR P DECOMP 530 Bbls lost during well kill. Blow down lines. ND Tree. Inspect tubing hanger top threads - OK. 8 turns to MU 2 7/8" 8 rd EUE. 09:00 - 15:30 6.50 WHSUR P DECOMP NU DSA. PU BOPE. Ambient temperature ~ -41 deg F. MU same. MU choke and kill lines. Hook up accumulator hoses. 15:30 - 00:00 8.50 WHSUR P DECOMP BOPE test to 250 psi / 3500 psi. Test annuular to 3500 psi. Break in new VBR's with 2 7/8" - 3 1/2" - 4 1/2" test joints. BOPE test w/ 2 7/8" and 4 1/2" test joints. States right to witness BOPE test waived by Bob Noble. 3/1/2008 00:00 - 03:00 3.00 WHSUR P DECOMP HCR kill valve, outer spacer spool valve, tested after servicing. 3-1/2" dart valve failed. Tool service XO (4-1/2 IBT-MOD pin / 3-1/2 IF box) tested. Gravity fill well -30 BPH, ambient temperature -50 deg F. 03:00 - 04:00 1.00 WHSUR P DECOMP Blow down lines 04:00 - 06:00 2.00 WHSUR P DECOMP PU/MU Opso-Lopso and lubricator and tested 500 psi with diesel, pull TWC, LD lubricator and Opso-Lopso. Tbg and IA on vacuum. Secure well. 06:00 - 07:30 1.50 PULL P DECOMP Break out LDS. Line up w/ SW down kill line. Pump 3 Bbls SW on top of hanger. Pull Tbg hanger up into stack w/ 50K, fluid dropped out of sight. Pump 30 Bbl SW down IA. Pump 45 Bbl SW down Tbg. Tbg and IA on vaccum. 07:30 - 09:00 1.50 PULL P DECOMP BOLD tubing hanger and pup joint. Pull tubing and run cable over ESP cable shieve. Printed: 3/27/2008 1:51:11 PM BP AMERICA Page 2 of 2 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 2/28/2008 End: 3/3/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/3/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours , Task Code I', NPT , Phase Description of Operations 3/1/2008 09:00 - 17:00 8.00 PULL P DECOMP POH laying down 2 7/8" tubing (210 jts), 1 - 2 7/8" x 1" GLM, 1 - X nip, 1 - AVA sleeve. Continuous hole fill (no returns) ~ 30 BPH as POH to 190 jts to -670 ft. 17:00 - 17:30 0.50 PULL P DECOMP All crew review on "NU BOPE", with RLG leadership coach. 17:30 - 19:30 2.00 PULL P DECOMP Continue POH and laying down 2-7/8" tubing from -670 ft to centrilift motor- pump assembly. Lost (1) flat guard in well. Recovered (113) LaSalle clamps, (5) protectolizers, and (2) flat guards. 19:30 - 22:00 2.50 PULL P DECOMP BO/LD centrilift ESP assembly. 22:00 - 00:00 2.00 PULL P DECOMP R/D ESP cable and trunk, clean and clear rig floor. Load out centrilift ESP pump and motor assembly. 3/2/2008 00:00 - 06:00 6.00 BUNCO RUNCMP Put 4-1/2" tbg in shed, rabbit and SLM. PU 4-1/2" tubing handling tools to rig floor and RU to run tubing. Pump -30 BPH into well with no returns. Remove thread protectors and clean. (Used work string w/ rust etc) 06:00 - 15:00 9.00 BUNCO RUNCMP Crew change. PUMU 4 1/2" WLEG / pup jt, XN nip, pup jt. PUMU 4 1/2" 12.6#, L-80 workstring 1 x 1 from pipeshed. 93 joints of IBT-M, 1 XO pup from IBT-M to NSCT, 78 joints of NSCT. 171 full joints, 2 space out pups. 15:00 - 16:00 1.00 WHSUR P TUBHGR PUMU landing joint w/ TIW valve. MU tubing hanger. MU to 4 1/2" workstring. PU wt of 73K, SOW of 40 K. RIH and land tubing hanger. 16:00 - 17:00 1.00 WHSUR P WHDTRE Dry rod TWC. Unable to test TWC from below due to low BHP. Test to 3500 psi from above. LDS leaking. Re-tighten LDS. Test to 3500 psi from above and chart for 10 minutes. 17:00 - 23:00 6.00 WHSUR P WHDTRE ND BOPE, spacer spool and DSA flange. Change out HCR Kill valve. Lay over BOP stack on to cradle. 23:00 - 00:00 1.00 WHSUR P WHDTRE Spot tubing head adaptor and tree into cellar.To maintain a safe distance from pad flow lines with the BOP on the cradle, the cellar doors could not be closed completely. (ambient temperature -30 deg F.) 3/3/2008 00:00 - 04:30 4.50 WHSUR P WHDTRE Heat up and NU tubing head adaptor flang and 4" tree. FMC test hanger void to 5,000 psi for 20 minutes. Install blind flange on companion valve. Test tree and valves to 5,000 psi no visible leaks. 04:30 - 06:00 1.50 WHSUR P WHDTRE RU lubricator, pull TWC. Run BPV. Normal up tree and cellar. Rig released C~ 06:00 Printed: 3/27/2008 1:51:11 PM I BP AMERICA Page 1 of 3 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 3/15/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/20/2008 Rig Name: NABOBS 3S Rig Number: 'Date I From - To Hours Task Code (NPT 'Phase Description of Operations 3/16/2008 10:00 - 14:00 4.00 RIGD P PRE Begin rig down process off of MPG-15. Scope the upper section of the Derrick down and lay down the Derrick. RD the Pits and Pipe Shed Modules and back out the Pipe Shed. 14:00 - 14:30 0.50 MOB P PRE PJSM with truck drivers, truck pusher and crew. 14:30 - 16:30 2.00 MOB P PRE Notify Milne Point of move and begin down Tract 14 road with the Pipe Shed. Back out the Pits Module from the Carrier. Notify Pad Operator and back the Carrier off well slot MPG-15 with the WSL and Pad Operator present. Mobilize the Pits and Carrier to MPH-Pad. 16:30 - 19:00 2.50 RIGU P PRE Line up Carrier over MPH-19 with the WSL and Pad Operator present. Pull Carrier foward. Lay mats around MPH-19. Unroll and lay herculite for Carrier. 19:00 - 20:30 1.50 RIGU P PRE Back Carrier over MPH-19 with WSL and Pad Operator present. Jack and level rig. 20:30 - 22:30 2.00 RIGU P PRE Lay herculite, spot and level pits and pipeshed. Pull eclectrical lines between modules and connect. Install new descending device on derrick. Berm up herculite with Handy Berm Kit. 22:30 - 00:00 1.50 RIGU P PRE Inspect derrick and raise derrick off of Carrier. Scope up upper derrick section and insure locking dogs are set. 3/17/2008 00:00 - 00:30 0.50 RIGU P PRE Secure derrick and guy lines. 00:30 - 01:30 1.00 RIGU P PRE R/U rig floor, hook up lines and put steam around rig. Line up pits to take on fluid. 01:30 - 05:00 3.50 KILL P DECOMP R/U secondary annulus valve on IA, hook up lines to well. R/U hard line to Tiger Tank. Test mud lines to 3,500 psi and Tiger Tank lines to 500 psi. ** Rig Accepted at 01:00 hours on 3/17/2008 ** 05:00 - 06:00 1.00 KILL P DECOMP R/U lubricator and test to 500 psi. Well tech pulled Cameron 4" BPV. 500 psi on tubing, 460 psi on IA and 200 psi on OA. 06:C0 - 07:00 1.00 KILL P DECOMP Pre-tour checks and service the Rig. Double check valve alignment and lines prior to killing the well. 07:00 - 07:30 0.50 KILL P DECOMP Open the well to a closed choke and observe pressures on the well: Tubing = 450 psi and IA = 460 psi. Bleed the pressure off the IA to 0 psi to the Tiger Tank. The Tubing bled down to 415 psi. Bleed the Tubing pressure down to 0 psi to the Tiger Tank. 07:30 - 10:30 3.00 KILL P DECOMP Bullhead down the IA with heated seawater. Work the rate up to 4 bpm. The IA pressure while bullheading went from 130 psi down to 0 psi and then back up to 40 psi by the end of the bullhead. The Tubing pressure started at 260 psi and finished at 170 psi by the end of the bullhead. Pumped a total of 310 bbls down the IA. Shut down and the IA is on a vacuum. The Tubing bled down to 0 psi. Swap over to the Tubing and bullhead 205 bbls of seawater down the Tubing at a rate of 4 bpm. The Tubing pressure went from 370 psi down to 210 by the end of the bullhead and the IA pressure went from 0 to 200 psi by the end of the bullhead. 10:30 - 12:00 1.50 KILL P DECOMP Monitor the well for 30 minutes. The Tubing is on a vacuum and the IA showing about 150 psi. Bleed the IA pressure off to the Tiger Tank. The IA pressure is showing 0 psi but blowing through the needle valve. Monitor the well another 30 minutes and the Tubing is still on a vacuum and the IA is blowing. Confer with Anchorage Engineering and decision made to bullhead another IA volume (175 bbls) down the IA and monitor Printed: 3/27/2008 1:51:25 PM ~ r BP AMERICA Page 2 of 3 Operations .Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 3/15/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/20/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/17/2008 10:30 - 12:00 1.50 KILL P DECOMP the well. 12:00 - 14:00 2.00 KILL P DECOMP Line up down the IA and bullhead 175 bbls of heated seawater at a rate of 4 bpm / 130 psi pump pressure. Shut in the well and monitor. The IA is on a vacuum. The Tubing is static. 14:00 - 14:30 0.50 WHSUR P DECOMP PU T-bar and set 4" TWC with FMC rep. 14:30 - 16:00 1.50 WHSUR P DECOMP Pressure test the TWC from above to 3,500 psi for 10 charted mins - OK. Attempt to test from below by injecting at 1 bpm / 10 psi for 30 charted mins - OK. 16:00 - 16:30 0.50 WHSUR P DECOMP Secure the well and have the whole crew come to the Meeting Room for a photo session at Nabors request. Take individual crew member photos as well as a group photo. 16:30 - 18:00 1.50 WHSUR P DECOMP ND the 4-1/16" Tree and Adapter Flange. Check the 4-1/2" NSCT Hanger threads with FMC rep - OK. 5-1/2 turns to the left. 18:00 - 19:00 1.00 BOPSU P DECOMP N/U DSA, secure cradle, lift BOP stack from cradle. Inspect and set BOP stack on DSA. 19:00 - 20:00 1.00 WHSUR P DECOMP Remove the 4-1/16" Tree from the cellar area. 20:00 - 22:30 2.50 BOPSU P DECOMP N/U BOP stack, install koomey lines, choke hose, kill hose, turnbuckles and riser. 22:30 - 23:00 0.50 BOPSU P DECOMP Function test BOPE. All components operating correctly. 23:00 - 00:00 1.00 BOPSU P DECOMP R/U 2-7/8" and 4-1/2 Test assemblies. Fill BOP stack and warm up hydril, fill choke manifold. 3/18/2008 00:00 - 05:30 5.50 BOPSU P DECOMP Test BOPE to 250 psi low pressure and 3,500 psi high pressure. Each test was held for 5 minutes on chart. Tested choke valves, manual kill, manual choke line valve, HCR kill, HCR choke line valve, floor valves, Blind Rams, VBR's and Annular with 2-7/8" test joint and 4-1/2" test joint. No failures. Perform Koomey drawdown test. ** AOGCC witness of BOP test was waived by Lou Gramaldi. 05:30 - 06:30 1.00 BOPSU P DECOMP R/D test assemblies and blowdown choke and kill lines. Drain the Stack. 06:30 - 08:00 1.50 WHSUR P DECOMP PU Opso Lopso from the Pipe Shed and change out XO's to screw into 4-1/2" NSCT threads. Screw into the Hanger threads with 8 turns. PU Lubricator and Polished Rod and MU to the Opso Lopso. Pressure test to 500 psi with diesel. 08:00 - 09:00 1.00 WHSUR P DECOMP Pull 4" Type "H" TWC with Well Support Techs. The Tubing is on a vacuum. 09:00 - 10:00 1.00 WHSUR P DECOMP Break off and lay down Polished Rod and Lubricator. Change out XO's on the Opso Lopso and lay down the Opso Lopso. 10:00 - 11:00 1.00 PULL P DECOMP PU Landing Joint with 4-1/2" NSCT XO on bottom for the Hanger. MU TIW Valve on top of the Landing Joint. BOLDS with FMC rep. Check the IA pressure =vacuum. Pump some seawater on top of Hanger. Pull on the Hanger and came free at 68K. Observe fluid on top of Hanger go down the Tubing. Pull the Hanger to the Floor with a PUW = 65K. 11:00 - 12:00 1.00 PULL P DECOMP R/U and pump 100 bbls down tubing at 4 bpm with 50 psi. No returns. 12:00 - 21:00 9.00 PULL P DECOMP POOH laying down 4-1/2" NSCT and 4-1/2" IBT tubing workstring. Laid down a total of 171 joints. 21:00 - 22:00 1.00 PULL P DECOMP R/D 4-1/2" handling equipment. Clear and clean rig floor. Clear 4-1/2" tubing from pipeshed. 22:00 - 23:00 1.00 BUNCO RUNCMP R/U 2-7/8 handling equipment, load 2-7/8" jewelry and ESP Printed: 3/27/2008 1:51:25 PM BP AMERLCA Page 3 of 3 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: WORKOVER Start: 3/15/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/20/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task Code NPT 3/18/2008 22:00 - 23:00 1.00 BUNCO 23:00 - 00:00 1.00 BUNCO 3/19/2008 00:00 - 02:30 2.50 BUNCO 02:30 - 09:30 I 7.001 RU 09:30 - 00:00 14.501 RU 3/20/2008 100:00 - 04:30 I 4.501 RU 04:30 - 05:00 I 0.50 05:00 - 06:00 1.00 06:00 - 09:00 3.00 09:00 - 10:00 1.00 ~ WHSUR P 10:00 - 11:30 1.50 W HSU R P 11:30 - 16:30 5.00 WHSUR P 16:30 - 21:00 4.50 WHSUR P 21:00 - 22:30 I 1.501 WHSUR I P 22:30 - 00:00 I 1.501 WHSUR I P Phase ~ Description of Operations RUNCMP into pipeshed and prep to run. RUNCMP P/U and M/U ESP. RUNCMP M/U ESP, Pull ESP cable over dual ESP sheave. Attach ESP cable to ESP. RUNCMP RIH with ESP completion picking up 2-7/8" 6.5#, L-80, EUE 8rd tubing from pipeshed. Use Best-O-Life 2000 pipe dope. Make up torque of 2,300 fUlbs. Maintain continious hole fill of 30 bph. Check ESP cable every 2,000' and flush the ESP pump with 10 bbls of seawater. RUNCMP Start to run Heat trace 15' in on joint # 99. Maintain continious hole fill of 30 bph while RIH. Check ESP and Heat Trace every 2,000' and flush ESP with 10 bbls of seawater. 175 joints in at 00:00 hrs. RUNCMP RIH with ESP completion and Heat Trace. Maintain continious hole fill of 30 bph while RIH. Check ESP and Heat Trace every 2,000' and flush ESP with 10 bbls of seawater. 1/2 bpm at 200 psi. Ran 209 joints of 2-7/8", 6.5#, L-80, EUE 8rd tubing. Up weight 50K, down weight 37K RUNCMP M/U and orient hanger. Install penetrators in hanger. Measure and cut ESP and Heat Trace cables. Clamping equipment run: 56 LaSalle / 5 Protectolators / 3 Armster cable guard / 1723 metal bands / 566 - 6' flat guards / 12 - 4' flat guards / 10 - 3' flat guards. RUNCMP R/U and splice ESP and Heat Trace cables. continious hole fill of 30 bph while making splice. RUNCMP Make ESP power cable and heat trace cable splices. Checks - ESP power cable: 3.0 ohms phase to phase / 1.85 gig ohms phase to ground. Phoenix sensor: 1734 psi / 78 deg F C«~ intake. Heat Trace cable: 60 gig ohms after 1 minute -phase to ground. TUBHGR Land Tbg hanger w/ 48K PUW / 38K SOW. RILDS. Back out landing joint. RUNCMP Dry rod TWC. Measure distance to engage ~ 1 9/16" and 5 turns. Test from above to 3500 psi w/ SW and chart for 10 minutes. Attempt to test from below by pumping in IA, but well on vaccum. Pump SW Ci? 2 BPM, 110 psi for 30 minutes and chart. OTHCMP Pump stack and ND BOPE. Set BOP stack on stand and lay over in moving cradle. OTHCMP Install adaptor flange and Tree. Test hanger void to 5,000 psi for 20 minutes, install flange on wing valve and test tree with diesel to 5,000 psi for 10 minutes. Perform final check on ESP and Heat Trace connections. Final readings on ESP of 3.8 ohms phase to phase, 1,670 psi bottom pressure, 81.8 degrees motor temp, 79.6 degrees intake temp. Heat trace reading of 4.2 phase to phase, and 168 gig ohms. OTHCMP R/U lubricator and pull TWC, 0 psi tubing pressure. Install BPV. R/D lubricator. OTHCMP Slip and cut drilling line, remove secondary annulus valve, secure tree and cellar. Rig released at 24:00 hours. Printed: 3/27/2008 1:51:25 PM Page 1 of 2 • Maunder, Thomas E (DOA) From: Davies, Stephen F (DOA) Sent: Tuesday, April 01, 2008 9:47 AM To: Roby, David S (DOA); Fleckenstein, Robert J (DOA}; Maunder, Thomas E (DOA}; Mahnken, Christine R (DOA) Subject: FW: MPH-19 / L1 -PTD #'s 207-136 & 207-137 Dave, Tom: FYI Bob F: for RBDMS Christine: Please print and place copies in well files for MPU H-19 and MPU H-19L1 Thanks, Steve D. From: Stewman, Sondra D [mailto:Sondra.Stewman@bp.com] Sent: Tuesday, April 01, 200$ 9:37 AM To: Davies, Stephen F (DOA) Subject: FW: MPH-19 / Li -PTD #'s 207-136 & 207-137 Steve, Please reference the following wells: Well Names: MPH-19 /MPH-19L1 Permit #'s: 207-136 / 207-137 API #: 50-029-23371-00-00 / 50-029-23371-60-00 MPH-19 Not on Production MPH-19L1 well began Production on March 25, 2008 Top of Slotted Liner: 7149' Bottom of Slotted Liner: 10737' Method of Operations is: ESP Date of Test: February 7, 2008 (Note: Due to problems with solids production that damaged the ESP we do not have proper Well Test data) Hours Tested: Unknown 24-Hour Rate /Oil-Bbl: 600 24-Hour Rate /Gas-Mcf: 200 24-Hour Rate /Water-Bbl: 60 Gas-Oil Ration: 333 Flow Tubing Pressure: 274 Casing Pressure: 360 4/7/2008 Page 2 of 2 Oil Gravity-API: Unavailable Sondra Stewman ADW Drilling Technologist Be real, be ~~reseni and most of cc~l be POSIT:IVf;! 4/7/2008 ~ • WELL LOG TRANSMITTAL To: State of Alaska March 13, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data MPH-19 L1 AK-MW-5355566 1 LIS formatted CD with verification listing. API#:50-029-2337160-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~, ,. ~~ Date: BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 i Signed: ~ ~0`~-l3 `~ ~j~ ~ STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 1 6 2008 WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & Gas Cons. Commission 1 a. Well Status: ®Oil , ^ Gas ^ Plugged ^ Abandoned ^ Suspended 2oAAC 2s.,os 2oAAC 2s.»o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well CI 01'a~ ®Devefopment ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 12/19/2007 ' 12. Permit to Drill Number 207-137 3. Address: P.O. Sox 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 12/11/2007 13. API Number 50-029-23371-60-00 4a. Location of Well (Governmental Section): Surface: ' FS ' 7. Date T.D. Reached 12/15/2007 14. Well Name and Number: MPH-19L1 , 2954 L, 4132 FEL, SEC. 34, T13N, R10E, UM Top of Productive Horizon: 4477' FSL, 756' FEL, SEC. 34, T13N, R10E, UM . 8. KB (tt above MSL): 70' Ground (tt MSL): 35.9' ~ 15. Field /Pool(s): Milne Point Unit / Schrader Bluff t Total Depth: 857' FSL, 690' FEL, SEC. 34, T13N, R10E, UM 9. Plug Back Depth (MD+TVD) 10780 4190 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 556512 ~ y- 6010105' Zone- ASP4 10. Total Depth (MD+TVD) 10780 4190 16. Property Designation: ADL 025906 ' TPI: x- 559873 y- 6011654 Zone- ASP4 Total Depth: x- 559974 ~ y- 6008035 ~ Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ®Yes ^ No ubmit electroni and Tin inf rm i n r 2 AA 5. 50 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): ~~~, ~~?t''~11~ DIR, GR, RES, GYRO, NEU, DEN, GeoTap, IFR/CASANDRA, USIT, CCL 5%/S2''T/b 22. CASING, LINER AND CEMENTING RECORD ~ P ~ 2 3 ° ~''v CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM .SIZE CEMENTING RECORD PULLED 2 " 92# H-4 urface 112' urface 112' 42" 2 0 sx Arctic e A rox. 10-3/4" 45.5# L- 6' 3814' 3 ' 2 28' 13-1/2" 0 sx Dee ret 2 x Li Cr to 7/5/ " .7# L- 34' 41 -7/ " 25 sx CI ' 4-1/ " 12.6# L- 0 6701' 10778' 4 91' 4189' 6-3/4" Un mented Slott d Liner 23. Open to production or inject ion? ®Yes ^ No 24. TuarNG RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Slze and Number): SIZE DEPTH SET MD PACKER .SET MD 4-1/2", 12.6#, L-80 Slotted Liner 4-1/2", 12.6#, L-80 6651' MD TVD MD TVD 7149' - 8073' 4173' - 4154' 25. ACID, FRACTURE, CEMENT SOVEEZE, ETC. DEPTH INTERVAL MD AMOUNT Ht KIND OF MATERIAL USED 8193' -9401' 4147' -x140' Freeze Protected with 95 Bbls of Diesel 9532' - 10044' 4138' - 4142' 10175' 10737' 4147' 4186' - - 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CALCULATED 24-HouR RATE.• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No - Sidewal l Core s A wired? Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical resuks per 20 AAC 25~; 071. I ~.raiS~~ { . ~fl- i ~,~.~i ~ ~ None - ~ ~.`~ ,~ ~ ?ODt~ ~ /z i9• ~i ~~lil iiU ?{ 7 Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~i~ ~ ~,1 / ~~_o~ ./a" U 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top 0' 0' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1800' 1779' detailed test information per 20 AAC 25.071. Ugnu-MA 5998' 3823' Ugnu-M61 6052' 3843' None Ugnu-MB2 6170' 3885' Ugnu-MC 6528' 4027' SBF2-NA 6594' 4052' SBF 1-NB 6669' 4080' TSBD /Top 'OA' 6862' 4149' Schrader Bluff'OA' 10780' 4190' Formation at Total Depth (Name): Schrader Bluff'OA' 10780' 4190' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and aLeak-Off Test Summary. 31. I hereby certify that the foregging is true d correct to the best of my knowledge. Signed Sondr Stewman Title Drilling Technologist Date ~l - ~ `p"~ MPH-19L1 207-137 Prepareo'ByName/Number- Sondra Stewman, 564-4750 Well Number Permi N . / A r V81 NO. Drilling Engineer: peul Hanson, 564-4195 INSTRUCTIONS GeNeRa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Tree: 4 1/16" - 5M Cameron Wellhead: 11" 5M FMC Gen 5 w/ 2 7/8" FMC Tubing Hanger ,EUE lift threads, 2.5" CIW H BPV profile 20" 91.1 ppf, H-40, cond. 115' KOP @ 720' Max. hole angle = 70° - 87° from 3218' to 7239' L-1 Max hole angle=71°-95° from 6859' to 10,780' 10 3/4", 45.5#, L-80 Btc. 3814' 2 7/8" 6.5 ppf, L-80, 8 rd EUE tbg.. ( drift ID = 2.347") 7 5/8" 29.7#, L-80, Btrc. production casing ( drift ID = 6.75", cap. = 0.0383 bpf ) Baker Production Liner Hanger Assembly 5.5"x 7.63"- "HR" ZXP Liner Top Pkr. 5.5"- "RS" Packoff Seal Nipple - 6701' 7.63" x 5.5"- Flex-Lock Liner Hanger - 6720' Milled csg. window from 6871' - 6882' Whipstock set in Mother Bore Top - 6870' Bottom - 6884' MPU H-19~~I w Orig. DF elev. = 70.2' (Doyon 14) Orig. GL elev.= 34.1 ` (Doyon 14) Orig. DF elev.= 70` (Doyon 14) Camco KBMG-M-2 202' 2-7/8" x 1" I I X Nipple (2.313") 1 2.250" ID 2060` I DATE REV. BY COMMENTS 12/19/07 REH Drill and Complete wlESP by Doyon 14 AVA Ported Nipple(2.441" ID) 6545' with Isolation Sleeve(1.87" ID) Centrilift Pump 6590' SXD / 142P23 Gas Separator 6611' GRSFTXARH6 Tandem Seal Sections 6616` GS83DBFERHLSS/CVH6PFSA Motor- KMH/190hp 6630' 2415 volt / 48 amp Phoenix XT-0 Sensor 6646' w! Centralizer 4.5" shoe @ 10737' 4.5" x 6.38" x TAM Swell Pkrs. 7708' 8128' 9457' 10099' 4.5" 12.6# L-80 tBT Slotted Liner 23 jts. 7149' - 8073' 30 jts. 8193' - 9401' 13 jts. 9532' - 10044` 14 jts. 10175' - 10737' Orig. PBTD (casing float) 6972` 7" casing shoe 7584` MILNE POINT UNIT WELL H-19 0000 BP EXPLORATION ~ ~ BP AMERICA Page 1 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To (Hours I Task Code NPT I Phase Description of Operations 11/24/2007 17:00 - 19:00 2.00 RIGD P PRE 19:00 - 20:30 1.50 MOB P PRE 20:30 - 22:00 1.50 MOB P PRE 22:00 - 00:00 2.00 MOB P PRE 11/25/2007 00:00 - 01:30 1.50 MOB P PRE 01:30 - 05:30 4.00 MOB P PRE 05:30 - 09:00 3.50 MOB P PRE 09:00 - 12:00 3.00 MOB P PRE 12:00 - 00:00 12.00 MOB P PRE 11/26/2007 102:30 - 23:00 I 20.50 MOB P PRE 23:00 - 00:00 1 1.001 MOB I P I I PRE PJSM -Skid rig floor to moving position Move rig off well H-14B Remove cellar doors and install back booster Install booster rack and front booster Move rig down H-pad to pad entrance Wait on Security. Troubleshoot booster operation Move rig from H-pad to Spine Rd. Fuel rig Move rig to Kuparuk river bridge. Wait on traffic/Security Move rig from Kuparuk river bridge to aprox. 5 miles down Milne Point main road Cont. moving rig down Milne Point main road Stop move due to Flat fire (front). Waiting for fire replacement. Rig located on Milne Point main road, between MPU-S pad access road and Milne Point camp. NOTE: new tires are transported on rolligon. Rolligon has to travel off road around rig to position tires on front side. Rolligon arrived w/ new tires. Unload rolligon 11 /27/2007 100:00 - 07:30 I 7.501 MOB I P I I PRE 07:30 - 10:00 2.50 MOB P PRE 10:00 - 12:00 2.00 MOB P PRE 12:00 - 13:00 1.00 MOB P PRE 13:00 - 16:30 3.50 MOB P PRE 16:30 - 19:00 2.50 MOB P PRE 19:00 - 23:30 4.50 MOB P PRE 23:30 - 00:00 0.50 RIGU P PRE 11/28/2007 00:00 - 06:30 6.50 RIGU P PRE 06:30 - 07:30 1.00 RIGU P PRE 07:30 -11:00 3.50 RIGU P PRE 11:00 - 12:30 1.50 RIGU P PRE 12:30 -14:30 I 2.OO) RIGU I P ISURF 14:30 - 20:30 6.00 DRILL P 20:30 - 21:00 I 0.501 DIVRTR 1 P I ISURF 21:00 - 22:00 1.00 DRILL P SURF 22:00 - 23:00 1.00 DRILL P SURF 23:00 - 23:30 0.50 DRILL P SURF 23:30 - 00:00 0.50 DRILL P SURF 11/29!2007 00:00 - 01:00 1.00 DRILL P SURF NOTE: Rolligon broke down on its way to the rig. Remove booster tires, booster frame, main cross frame support and garage door -Replace two tires on right front side of rig Move rig down Milne Point main road to Milne Point camp "Y" Replace garage door, main cross frame and booster frame Install front booster Move rig from Milne Point camp "Y" to MPU-H pad Remove back booster -Install doors -Place diverter in cellar Spot rig over well MPH-19 and shim Skid rig floor to drilling position Accept rig at 00:00 11-28-2007 NU diverter and knife valve -Taking spud mud in pits - Changing saver sub to 4 1/2" IF Load pipe shed w/ motor, MWD tools, jars, 105 jts 5" DP & 17 jts 5" HWT -Strap same Finish changing saver sub to 4 1/2" IF -Perform derrick inspection -Continue taking on spud mud ATP w/ both crews, rig support personnel, Toolpusher, Wellsite Leader, MP Wells Operation Supervisor - MP Area Manager, MP Environmental Advisor and MP Safety Advisor. Several Topics of safety and environmental were discussed by MP representatives. Critical well issues were discussed by Wellsite Leader. Finish RU surface stack, flow line, fill up line, etc. PU 5" DP (105 jts), HWDP (17 jts) and Jars from pipe shed and rack back in derrick Test diverter. Test witnessed by WSL. Jeff Jones, AOGCC Rep, waived witness of test. Mobilize BHA components to rig floor MU BHA: Bit -Mud Motor -Float Sub -Stab - UBHO Sub - XO RU Gyro equipment Hold pre-spud meeting with rig crew and service hands Spud well. Drill to 157' w/ HWDP Printed: 1/7/2008 3:36:39 PM i BP AMERICA Page 2 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 ,Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 1.1/29/2007 01:00 - 02:30 1.50 DRILL N RREP SURF Repair conveyor #1: change sprocket 02:30 - 04:30 2.00 DRILL P SURF Drill surface hole f/ 157' to 282' w/HWDP, taking Gyro surveys 04:30 - 05:00 0.50 DRILL P SURF POH f/ 282' to 60' to add MWD and flex collars to BHA 05:00 - 09:00 4.00 DRILL P SURF MU MWD, orient and download - MU Flex collars -Test MWD 09:00 - 12:00 3.00 DRILL P SURF Dir. drill f/ 282' to 476', taking Gyro surveys every stand. 500 gpm / 1140 psi -PUW: 35k /SOW: 35k / ROTW: 35k - TOon: 2k / TOoff: 1 k 12:00 - 00:00 12.00 DRILL P SURF Dir. drill f/ 476' to 1,285'. Take Gyro surveys every stand to 720' 550 gpm / 1650 psi -PUW: 97k /SOW: 97k / ROTW: 97k - TOon: 4k / TOoff: 2k 11/30/2007 00:00 - 12:00 12.00 DRILL P SURF Dir. drill f/ 1,285' to 2,513' - 558 GPM, 1920 psi on - 1740 oft - Tq on 4k -off 3k - WOB 15k -PUW 120k -SOW 110k -ROW 115k -Appeared to reach base of Permafrost at +-1700' - Early signs of hydrates at +-1850' 12:00 - 13:00 1.00 DRILL P SURF CBU 2x 13:00 - 15:00 2.00 DRILL P SURF Observe well -Pump out of hole to BHA at 720' w/ 560 GPM 1740 psi 15:00 - 16:00 1.00 DRILL P SURF RIH to 2,420' -Wash last stand to bottom at 2,513' w/ no issues. 16:00 - 00:00 8.00 DRILL P SURF Dir. drill f/ 2,513' to 3,172' - 550 GPM, 1890 psi on / 1690 psi off - Tq on 7k /off 4k - WOB 25k -PUW 125k -SOW 102k - ROW 115k 12/1/2007 00:00 - 06:30 6.50 DRILL P SURF Dir. drill f/ 3,172' to 3,825' (13 1/2" section TD) 550 gpm - 1720 psi off, 1750 on - Tq = 4k off, 5-9k on w/ 80 rpm - 25k WOB -AST .73 -ART 3.21 - ADT 3.94 hrs -PUW 127k, SOW 95k, RTW 112k 06:30 - 08:00 1.50 DRILL P SURF CBU x2 - 550 gpm 1770 psi - R&R DP w/ 80 rpm 08:00 - 12:00 4.00 DRILL P SURF Observe well 15 min -Pump out of hole w/ full drlg rate to 635' 12:00 - 14:00 2.00 DRILL P SURF RIH to 3,742' w/ no issues 14:00 - 16:30 2.50 DRILL P SURF Screw in TD -Wash last stand to bottom at 3,825' -CBU x3 w/ 550 gpm 1800 psi - R&R Dp w/ 100 rpm 6k tq 16:30 - 19:30 3.00 DRILL P SURF Observe well -Pump out of hole w/ full drlg rate to HWDP @ 720' 19:30 - 20:00 0.50 DRILL P SURF Stand back HWDP and jars in derrick 20:00 - 20:30 0.50 DRILL P SURF LD flex collars 20:30 - 21:30 1.00 DRILL P SURF Down load MWD 21:30 - 23:00 1.50 DRILL P SURF LD MWD and stabilizer -Break bit - LD mud motor 23:00 - 00:00 1.00 DRILL P SURF Clear rig floor 12/2/2007 00:00 - 01:00 1.00 CASE P SURF RU to run 10-3/4" casing 01:00 - 05:00 4.00 CASE P SURF PJSM -Run 10-3/4" 45.5# L-80 BTC casing to +/- 2,740', breaking circulation every 10 joints. Straight blade centralizers on first 53 jts as per plan. 05:00 - 06:00 1.00 CASE P SURF Pipe taking weight +/- 2,740'. Break circulation. Work down through tight spot f/ 2,740'-2,900' 06:00 - 08:00 2.00 CASE P SURF Continue run 10 3/4" casing - PU landing joint and mandrel hanger -Wash down and land hanger w/ 10 3/4" shoe at 3,814' - PU 1' from landing ring. Total jts run: 92 08:00 - 10:30 2.50 CASE P SURF Circulate and condition /thin mud for cement job, 6.5 bpm 430 psi 10:30 - 11:30 1.00 CASE P SURF RD Franks fill up tool - RU Dowell cement head 11:30 - 13:00 1.50 CASE P SURF Hold PJSM w/ cementers while circulating casing voume at 6.5 Printed: 1/712008 3:36:39 PM ~ r BP AMERICA Page 3 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task ~ Code NPT I Phase Description of Operations 12/2/2007 13:00 - 15:30 I 2.501 CEMT I P 15:30 - 17:00 I 1.501 CEMT I P 17:00 - 18:00 1.00 CASE P 18:00 - 19:30 1.50 CASE P 19:30 - 22:00 2.50 DIVRTR P 22:00 - 23:00 1.00 WHSUR P SURF bpm 190 psi SURF Give to Schlumberger -Pump 5 bbls H2O -Test lines to 3,000 psi -Pump 90 bbls Mud Push at 10 ppg -Drop bottom plug -Pump Lead - 411 bbls Deep Crete at 10.7 ppg (600 sx yield 3.85 ft3/sx) -Pump Tail - 100 bbls Deep Crete at 12.5 ppg (252 sx yield 2.23 ft3/sx) -Kick out top plug w/ 10 bbls H2O SURF SURF SURF SURF SURF 23:00 - 00:00 1.00 BOPSU P SURF 12/3/2007 00:00 - 02:30 2.50 BOPSU P SURF 02:30 - 04:00 1.50 BOPSU P SURF 04:00 - 10:00 6.00 BOPSU P SURF 10:00 - 11:00 1.00 BOPSUF~ P I I SURF 11:00 -11:30 0.50 CASE I P SURF 11:30 - 12:30 1.00 CASE P SURF 12:30 -13:30 1.00 CASE N RREP SURF 13:30 -17:00 3.50 CASE P SURF 17:00 - 18:30 1.50 CASE P SURF 18:30 - 20:00 1.50 CASE P SURF 20:00 - 20:30 0.50 CASE P SURF 20:30 - 21:30 1.00 CASE P SURF 21:30 - 22:00 0.50 CASE P SURF 22:00 - 00:00 2.00 CASE P SURF 12/4/2007 00:00 - 02:30 2.50 CASE P SURF 02:30 - 03:30 1.00 CASE P SURF 03:30 - 04:00 0.50 CASE P SURF 04:00 - 05:30 1.50 CASE P SURF 05:30 - 08:00 I 2.501 CASE I P I I SURF Displace cement w/ rig pumps - 7 bpm 270 psi -Bump plug at 3,540 stks w/ 2,500 psi (2,000 psi over final circ. pressure) -CIP at 17:00 hrs. -140 bbls good cement back to suface Hold 2,500 psi on plug f/ 30 min on chart -Good casing test - Bleed off pressure -Check floats - OK - LD Cement head LD landing joint -Flush stack -Jet flow line and blow down fill up lines ND diverter system -Separate bag from knife valve assy. - Remove both from cellar Install casing head and tubing spool. Test metal to metal seal to 1,000 psi x 10 min per FMC NU BOP. Continue NU BOP Install test plug - RU to test BOP PJSM -Test BOP and related equipment per BP / AOGCC regulations and procedures -Test to 250 psi low - 3,500 psi high (annular preventer to 250 psi low - 2,500 psi high) x 5 min each. Chart tests. Test w/ 5" test joint. Test top and bottom rams w/ 5" & 4" test joints. Test witnessed by WSL and Toolpusher. Chuck Scheve, AOGCC rep, waived witness of test. RD test equipment -Pull test plug and install wear ring Move HWDP in derrick f/ DS to ODS (will use DS to rack back 4" DP) PU and RIH 4" DP f/ pipe shed Troubleshoot and remove air blockage in drawworks clutch Cont. PU and RIH 4" DP f/ pipe shed. Total jts PU: 114 Cut and slip drilling line -Service top drive -Circulate DP volume 190 gpm, 200 psi POH and rack back 4" DP (Winds 30-50 MPH) Circ. to balance mud Contnue POH w/ 4" DP (Winds 30-50 MPH) Mobilize BHA to rig floor PJSM - MU BHA per program Upload MWD -Shallow test MWD -Load nukes. Continue to M/U BHA: -Flex collars, HWDP, jars and XOs - C/O elevators. RIH on 4" DP, PU 18 jts f/ pipe shed. Continue to RIH on 4" DP f/ derrick to 3,685' md. -Change elevators -RIH w/ 5" DP to 3,781' md. Screw in Top Drive -Break circulation. Printed: 7/7/2008 3:36:39 PM • r BP AMERICA Page 4 of 14 Operations Summary Report Legal Well Name: MPH-19 .Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/4/2007 05:30 - 08:00 2.50 CASE P SURF -Obtain parameters. -Tag Float Collar at 3,728' md. -Drill Float Collar, cement, shoe track and 20' of new hole to 3,845' md. 08:00 - 08:30 0.50 CASE P SURF CBU w/ 350 gpm, 1520 psi. -Reciprocate & Rotate DP w/ 60 RPM. 08:30 - 09:30 1.00 CASE P SURF Displace well w/ 8.7 ppg LSND mud. -510 gpm, 1800 psi. -Reciprocate & Rotate DP w/ 60 rpm. 09:30 -10:00 0.50 CASE P SURF Blow down Top Drive. -R/U to perform FIT. -Clean surface equipment. 10:00 - 11:00 1.00 CASE P SURF Perform FIT w/ 8.7 ppg LSND -2,919' TVD, 425 psi = 11.5 EMW. -Good Test. -R/D test equipment. -Obtain SPRs. 11:00 - 12:00 1.00 DRILL P INT1 Directionally Drill f/ 3,845' to 3,868' md. -P/U= 120K -SOW= 85K -ROT wt= 100K. - 500 gpm / 1740 psi off - 1900 psi on. - 80 rpm, 4K Tq off - 6k Tq on. -AST= 0, ART= 0.47, ADT= 0.47 hrs. 12:00 - 00:00 12.00 DRILL P INT1 Directionally Drill f/ 3,868' to 5,288' md. -P/U= 137K -SOW= 100K -ROT wt= 112K. - 550 gpm / 2250 psi off - 2420 psi on. - 100 rpm, 4K Tq off - 7K Tq on. -Daily total= AST= 3.23, ART= 4.05, ADT= 7.28 hrs. -Shaker screens= 170s. ',12/5/2007 00:00 - 06:30 6.50 DRILL P INT1 Drill from 5,288' to 6,043' md. -P/U= 170K, SOW= 100K, ROT wt= 125K. -550 gpm / 2260 psi off - 2340 psi on. -100 rpm, 7K tq off - 9K tq on. W06= 5K. -AST= 2.13, ART= 2.0, ADT= 4.13 hrs. 06:30 - 08:00 1.50 DRILL P INT1 CBU x 2. -Rotate & Reciprocate @ 100 rpm while pumping. -550 gpm ! 2200 psi. -Flow check well -Static. 08:00 - 11:00 3.00 DRILL P INT1 Short trip, pump out of hole @ drilling rate t/ 3,779' md. -Sticky pulling thru shoe. -Work into Csg @ 3,814' md. 11:00 - 12:00 1.00 DRILL P INT1 Circulate until shakers are clean. -Large clay balls and chunks of coal observed. -450 gpm / 1740 psi. -Rotate & Reciprocate @ 50 rpm. 12:00 - 12:30 0.50 DRILL P INT1 RIH (4 stds) f/ 3,814' to 4,262' md. -Pull back thru shoe. No problems encountered. 12:30 - 14:00 1.50 DRILL P INT1 RIH f/ 3,814' to 6,043' md. -Wash last stand to bottom. 14:00 - 00:00 10.00 DRILL P INT1 Directionally Drill f/ 6,043' to 6,828' md. -P/U= 155K, SOW= 110K, ROT wt= 126K. -550gpm / 2330 psi off, 2450 psi on. -80 rpm, 6K tq off - 7K tq on. -AST= 3.77, ART=6.61, ADT=10.38 hrs. Printed: 1/7/2008 3:36:39 PM 1 M BP AMERICA Page 5 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date ~ From - To Hours Task ~ Code NPT Phase Description of Operations 12/6/2007 100:00 - 08:30 I 8.501 DRILL I P 08:30 -11:00 I 2.501 DRILL I P 11:00 - 12:00 I 1.001 DRILL I P 12:00 - 14:30 I 2.501 DRILL I P 14:30 - 17:00 I 2.501 DRILL I P 17:00 - 18:00 I 1.00 (DRILL I P 18:00 -18:30 0.501 DRILL 18:30 - 23:00 4.50 DRILL P 23:00 - 00:00 I 1.001 DRILL I P 112/7/2007 100:00 - 01:30 I 1.50) DRILL I P 01:30 - 05:00 I 3.50) DRILL ( P 05:00 - 05:30 0.50 DRILL P 05:30 - 06:00 I 0.50 DRILL I P 06:00 - 07:00 1.00 DRILL P 07:00 - 08:00 I 1.001 DRILL I P 08:00 - 09:30 1.50 DRILL P 09:30 - 12:00 2.50 DRILL P INT1 Directionally drill f/ 6,828' to TD @ 7,620' and / 4,260' TVD. -P/U= 150K, SOW= 110K, ROT wt= 125K. -650 gpm / 2490 psi off, 2600 psi on. -100 rpm / Tq off= 5K, Tq on= 5-8K. WOB=7K. -AST= 1.6, ART= 2.85, ADT= 4.45 hrs. INT1 CBU x 3. -550 gpm / 2580 psi. -Rotate @ 120 rpm & Reciprocate Drill String. -Flow Check Well -Static. INT1 Pump out of hole. -Mad Pass per Geologist f/ 7,620' to 7,450' md. -550 gpm / 2120 psi, 70 rpm. INT1 Pump out of hole and continue Mad Pass f/ 7,450' to 6,988' md. -550 gpm / 2120 psi, 70 rpm. INT1 Pump out of hole @ reduced rate. -Noted pressure loss. -Pump out f/ 6,988 to +/- 5,800' looking for washout. -320 gpm / 600 psi. -Found washout at +/- 1,800' from surface. -Washout is 18" below tool jt. -Continue to pump out of hole @ drilling rate to 4,638' md. INT1 CBU x 1.5 @ top of 4" DP at 4,638' md. -530 gpm / 2330 psi. -Rotate & Reciprocate. -100 rpm. Tq= 4K. INT1 Pull 6 stds 4" DP t/ 4,067' and and rack back on Driller's side. -Replace with 6 stds 5" DP t/ 4,638' md. INT1 RIH and complete Mad Pass per Geologist. -Mad Pass f/ 6,049' -5,949' and 6,988'- 6,600' md. -RIH to TD @ 7,620' md. INT1 Pump Hi-Vis Sweep and CBU x 3. -Stand back 1 std after CBU x 1.5. -550 gpm / 2600 psi. -Rotate and Reciprocate. -120 rpm, Tq= 6K. INT1 CBU x 3 @ TD. - (7,620' and / 4,260' tvd). -550 gpm / 2600 psi. -120 rpm, Tq =6K. INT1 Pump out of the hole f/ 7,620' to 4,351' md. -550 gpm / 2600 psi. INT1 CBU @ 4,351' md. -530 gpm / 2260 psi. -Rotate @ 50 rpm & Reciprocate drill string. INT1 POH t/ 3,775' md. (inside Csg) INT1 CBU. -520 gpm / 2010 psi & 50 rpm. -Flow check well -Static. -Pump dry job. -Mud wt in= 9.0 ppg, Mud wt out= 9.0+ ppg. INT1 POH t/ 752' md. INT1 L/D HWDP, Jars & Flex DCs. INT1 PJSM -Handling Nuclear Sources. Printed: 1/7/2008 3:36:39 PM ~ ~ BP AMERICA Page 6 of 14 ~ Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date :From - To Hotars Task Code NPT Phase ` Description of Operations 12/7/2007 09:30 - 12:00 2.50 DRILL P INT1 -Pull Nuclear Sources. -Download MWD data. 12:00 - 13:30 1.50 DRILL P INT1 Flush remaining BHA. -L/D Stabilizer, Float Sub, and Motor. -Break and L/D bit. 13:30 - 14:00 0.50 DRILL P INT1 Cfear rig floor of MWD tools. 14:00 - 14:30 0.50 DRILL P INT1 Pull wear ring and install test plug in preparation for changing rams. 14:30 - 17:30 3.00 DRILL P INT1 PJSM -Changing Rams & Changing Saver Sub. (SIM OPS) -Change top rams to 7 5/8". -Change Saver Sub to 4" HT-38. 17:30 - 18:30 1.00 DRILL P INT1 R/U to test 7 5/8" rams. -Test @ 250 psi and 3500 psi. -Chart and hold each test for 5 minutes. -Good Test. 18:30 - 20:30 2.00 CASE P INT1 R/U to run 7 5!8" 29.7# BTC-M !Vam Top Casing. -Change out to long bails and 350 ton casing elevators and. slips. -Install Frank's Fill Up Tool. -R/U power tongs and Torque Turn. -PJSM -Running 7 5/8" Casing. 20:30 - 00:00 3.50 CASE P INT1 Run 7 5/8" 29.7# BTC-M /Vam Top casing per running order to 1,360' md. -M/U Torque for BTC-M = 9000 -M/U Torque for Vam Top = 9400 -Dope all BTC-M connections using Best O Life 2000. -Dope all Vam Top connections using Jet Lube Seat Guard. -2 straight bladed centralizers per jt on jt #s 1-18 & 20 (#19 is window jt). -1 straight bladed centralizer per jt on jt #s 21-61. -Fill pipe every jt. 12/8/2007 00:00 - 03:30 3.50 CASE P INT1 Continue to run in hole w/ 7 5/8" Csg to 3,781' md. 03:30 - 04:00 0.50 CASE P INT1 Circulate 1- 7 518" casing volume inside 10 3/4" Csg. -252 gpm / 350 psi. 04:00 - 11:00 7.00 CASE P INT1 Continue to run in hole w/ 7 5/8" Csg. -Break circulation every 20 jts. -Wash last jt to bottom. - P/U wt= 225K, SOW= 125K. -168 gpm / 350 psi. 11:00 - 12:00 1.00 CASE P INT1 Space out for cement job. 12:00 - 12:30 0.50 CASE P INT1 M/U XO t/ Cmt head, M/U Cmt hose & valves. 12:30 - 16:30 4.00 CASE P INT1 Circulate & condition mud for Cmt job. -Mud wt= 9.0 ppg, Mud vis= 40 sec/qt. -Reciprocate pipe through out entire cement job. P/U= 225K, SOW= 125K. -PJSM on Cmt job. -Cement w/ - 5 bbls H2O, Test lines to 4000 psi. -Pump 50 bbls Mud push II @ 11.5 ppg. -Drop bottom plug. -Pump 170 bbls Cement tail @ 15.8 ppg. -Drop tap plug. Pump 10 bbls H2O. -Displace w/ Rig pumps. -Plug bumped, pressure up 1500 psi over circ Psi. Printed: 1/712008 3:36:39 PM ~ ~ BP AMERICA Page 7 of 14 Operations Summary Report Legal Well Name: MPH-19 (Common Well Name: MPH-19 Spud Date: 11/29/2007 (Event Name: DRILL+COMPLETE Start: 11/23/2007 End: 'Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date .From -To -Hours Task Code' NPT Phase. Description of Operations 12/8/2007 12:30 - 16:30 4.00 CASE P tNT1 -Hold f/ 10 minutes to check floats. 16:30 - 17:00 0.50 CASE P INT1 Rig down cement hose, T valves, Cmt head. -R/D XO, drain stack, suck out Csg. 17:00 - 17:30 0.50 CASE P INT1 Nipple down Flow line, Riser, Hote fill line. -N/D Bleed off line, break connection on Tbg spool. 17:30 - 21:30 4.00 CASE P INT1 Set E-Slips, Cut Csg w/ Wachs cutter. -Cut jt= 18.79'. Set packoff. 21:30 - 23:00 1.50 CASE P INT1 Nipple up BOPs, Adjust Riser. -Install Flow line. Tighten turn buckles. -Test pack off U 3800 psi f/ 10 minutes -Pass. -Inject down 10 3/4" X 7 5/8" annulus. -Inject 30 bbls / 2 bpm. Mud wt= 9.0 ppg. -Formation break down @ 1200 psi, w/ 14 bbls away. -Injection rate @ 1150 psi / 2 bpm. -Bleed down pressure= 800 psi. -Continue to inject 5 bbls every hr until freeze protected. 23:00 - 23:30 0.50 CASE P INT1 Clear floor of Csg equipment. -P/U test jt. P/U test plug. 23:30 - 00:00 0.50 CASE P INT1 PJSM- Discuss changing Rams. -Change out upper Rams. -Install test plug. -Pull 7 5/8", install 3 1/2" X 6" variables. 12/9/2007 00:00 - 01:00 1.00 CASE P INT1 Continue to change top Rams to 3 1/2" X 6" variables. 01:00 - 02:30 1.50 CASE P INT1 R/U to test BOPs. Test top Rams & Choke hose. -Test 250 psi high / 3500 psi low. -R/D test equipment. Pull test plug. -Install wear ring. 02:30 - 03:00 0.50 CASE P INT1 C/O Bell guide on Top Drive. -Attach Bales & elevators. 03:00 - 07:00 4.00 CASE P INT1 L/D 5" DP from mouse hole. 07:00 - 08:00 1.00 CASE P INT1 Mobilize Scraper BHA to rig floor. -C/O elevators and Roughneck dies for 4" DP. 08:00 - 10:00 2.00 CASE P INT1 P/U & M/U Scraper tools. -RIH w/ DCs & Jars. -P/U HWDP f/ pipe shed & RIH U 472' md. 10:00 - 11:30 1.50 CASE P INT1 Cut 8~ Slip Drilling Line. -Service Top Drive. 11:30 - 12:00 0.50 CASE P INT1 P/U 4" DP from pipe shed & RIH U 652' md. SIMOPS: freeze protect 10-3/4" x 7-5/8" OA: Little Red Svcs pump 100 bbls diesel - 2 bpm / 1,550 psi 12:00 - 18:00 6.00 CASE P INT1 P/U 4' DP from pipe shed & RIH U 6,894'md. -Fill pipe @ 3,949' md. 18:00 - 20:00 2.00 CASE P INT1 Wash & Ream f/ 6,894' to 6,974' md.(Tagged cmt ?6944', wash and reamed to 6974', took 10k weight on bit and was not drilling off set down with 15K on bit without rotating, picked up verify measurements and discovered 40' difference in casing strap, which put the float collar @ 6967') -376 gpm / 1440 psi. -30 rpm. Tq= 3K 20:00 - 20:30 0.50 CASE P INT1 Circulate & Condition mud. 20:30 - 23:30 3.00 CASE P INT1 Flow Check well. -Static -Pump Dry Job. -Blow Down Top Drive. Printed: 1/7/2008 3:36:39 PM ~ ~ BP AMERICA Page 8 of 14 Operations .Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 -Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code -NPT Phase Description of Operations 12/9/2007 20:30 - 23:30 3.00 CASE P INT1 -POH f/ 6,974' to 472' md. 23:30 - 00:00 0.50 CASE P INT1 Rack back HWDP, Jars, XOs, & 2 stds DCs. 12/10/2007 00:00 - 01:00 1.00 CASE INT1 Stand back 1 std DCs. -Break bit and L/D. -UD boot baskets and scraper. -L/D Bit sub, XO, & Float sub. 01:00 - 02:00 1.00 CASE INT1 PJSM- R/U & Running E-line. R/U Schlumberger E-line sheaves and tools. 02:00 - 05:30 3.50 CASE INT1 Schlumberger E-line RIH w/ USIT/ Gamma Ray / CCL f/ 6,965' and back to surface. 05:30 - 06:00 0.50 CASE INT1 R/D Schlumberger E-line. -Good logs. 06:00 - 07:00 1.00 CASE INT1 R/U & Test 7 5/8" Casing. -Hold @ 3000 psi for 30 minutes. Chart test. -Good test. -R!D test equipment. 07:00 - 10:30 3.50 CASE INT1 P/U Milling tools & Tubing handling tools to rig floor. -M/U mills and L/D in pipe shed. -Modify one jt 4 1/2" tubing for whipstock assy. 10:30 - 12:00 1.50 CASE INT1 M/U Tail pipe and Whipstock. -Attach mills and HWDP. 12:00 - 14:30 2.50 CASE INT1 M/U and program MWD tools. -M/U DCs and HWDP. -Function test MWD tools. - OK 14:30 - 19:30 5.00 CASE INT1 RIH w/ Whipstock f/ 570' to 6,800' and @ controlled rate. -Fill pipe every 20 stds. 19:30 - 21:00 1.50 CASE INT1 Obtain Milling Parameters. -Orient Whipstock to 14 degrees right of high side. -Tag TOC w/ Whipstock tailpipe @ 6,974' md. -Set Whipstock Anchor by setting down 9,500 lbs. -Shear Mills off top of Whipstock slide by setting down 35,000 lbs. -Top of Whipstock @ 6,870' md. Bottom of Whipstock @ 6,884' md. 21:00 - 00:00 3.00 CASE INT1 Mill Window f/ 6,871' to 6,882' md. -P/U= 148K, SOW=90K, Rot Wt.= 107K. -240 gpm / 1100 psi. -Tq off= 6K, Tq on= 7-10K. ~~ ~~'~ ~ ~ ~ -Top of Window @ 6,871' md. .~ - _ ___ ~ _ -OA pressure = 410 psi @ 2200 hrs _ 1271112007 ~~ 00:00 - 00:30 0.50 _ CASE __ P _ ~~ _ INT1 ~ Finish Milling Window & Mill 20`~of new hole f%y6,882' to 6,903' md. -P/U= 145K, SOW= 85K, Rot Wt=107K. -535 gpm /off btm= 1150 psi, on btm= 1260 psi. -120 rpm. Tq= 6K. 00:30 - 02:00 1.50 CASE P INT1 Work through window to assure full gauge opening. -Zero overpull noted rotating through window. -6K overpull noted while tripping through window. -Pump Hi-Vis sweep. 02:00 - 04:00 2.00 CASE P INT1 Displace well to 9.0 ppg FloPro. -Pump Spacer #1 - 40 bbls 9.5 ppg FloPro. -Pump Spacer #2 - 40 bbls Water. -Pump Spacer 3# - 40 bbls FloPro w/ 2 sks Flo-Vis. Printed: 1/7/2008 3:36:39 PM BP AMERICA Page 9 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 12/11/2007 02:00 - 04:00 2.00 CASE P INT1 -Chase Spacer #3 w/ +/-322 bbls new FloPro. -Fill pits with remaining 468 bbls of new FloPro. 04:00 - 04:30 0.50 CASE P INT1 -Flow Check Well. -Static -Clean Surface equipment. -Pump Dry Job. 04:30 - 07:00 2.50 CASE P tNT1 POH for Drilling Assembly f/ 6,865' to 466' md. 07:00 - 07:30 0.50 CASE P INT1 Stand back HWDP &DCs. -L/D Bumper Jars & TM. 07:30 - 08:00 0.50 CASE P INT1 Download MWD. 08:00 - 09:00 1.00 CASE P INT1 UD MWD tools, Float Sub, HWDP and Mills. -Gauge mills using 6 3/4" gauge ring. -Full gauge. 09:00 - 09:30 0.50 CASE P INT1 Clear Rig Floor of vendor tools. 09:30 - 10:00 0.50 CASE P INT1 Flush stack to clean out metal shavings from milling casing. -Function rams. -Flush stack again. 10:00 - 11:30 1.50 CASE P INT1 P/U & M/U 6 3/4" Bit, Motor, Float Sub, Stabilizers, MWD tools & one Non-Mag Flex DC. 11:30 - 12:00 0.50 CASE P INT1 Prep Nuke tools. 12:00 - 14:00 2.00 CASE P INT1 Upload MWD. -PJSM -Nuclear Sources. -Sperry Sun MWD load Nukes. -P/U 2 Non-Mag Flex DCs and HWDP. 14:00 - 15:00 1.00 CASE P INT1 RIH w/ Flex DCs. -L/D 4 3/4" Spiral DCs. 15:00 - 17:30 2.50 CASE P INT1 RIH w/ HWDP & Drilling Jar. Continue to RIH w/ 4" DP f/ 395' to 6,849' md. 17:30 - 18:00 0.50 CASE P INT1 Orient to 14 degrees right of high side and run through window @ 6,871' md. 18:00 - 00:00 6.00 DRILL P PROD1 Directionally drill f/ 6,912' to 7,276' md. -P/U= 142K, SOW= 85K, Rot Wt.=105K. -240 gpm /off btm= 1410 psi, on btm= 1520 psi. -Tq off= 5K, Tq on= 5-6K. -AST= 1.31, ART= .94, ADT= 2.25. ii 12/12/2007 00:00 - 12:00 12.00 DRILL P PROD1 Directionally Drilling ahead f/ 7,276' to 7,784' md. -On connection @ 7,358' md, packing off was noted. ', -P/U= 145K, SOW= 75K, Rot Wt= 100K. ', -245 gpm / psi off= 1500, psi on= 1660. ', -60 rpm / Tq off= 5K, Tq on= 7K. WOB= 5-15K. -AST= 3.05, ART= 1.83, ADT= 4.88. 12:00 - 16:00 4.00 DRILL P PROD1 Directionally Drill ahead f/ 7,784' and to 8,086' md. -P/U= 150K, SOW= 75, Rot Wt= 102K. -250 gpm / psi off= 1610, psi on= 1720. -60 rpm / Tq off= 5K, Tq on= 7K. W06= 4-7K. -AST= .28, ART= 2.13, ADT= 2.41. 16:00 - 18:00 2.00 DRILL P PROD1 Pump Hi-Vis Sweep & CBU x 3+. -Good Sweep. -10% increase in cuttings. -250 gpm / 1600 psi. 100 rpm. -Reciprocate Drill String one std. -Mud Wt In= 9.0 ppg, Mud Wt Out= 9.0+ppg. 18:00 - 20:00 2.00 DRILL P PROD1 POH on Elevators f/ 8>086' to 6,849' md. -P/U= 150K. Max overpull= 15K. L -No drag noted pulling through window. Printed: 117/2008 3:36:39 PM • • BP AMERICA Page 10 of 14 Operations .Summary. Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task .Code NPT Phase Description of Operations 12/12/2007 20:00 - 22:00 2.00 DRILL P PROD1 Flow Check Well. -Static. -Drop ball. Circ sub opened @ 2200 psi. -CBU x 3+. -10% increase in cuttings. -400 gpm / 1500 psi. -60 rpm / Tq=5K. -Reciprocate Drill String one std. 22:00 - 00:00 2.00 DRILL P PROD1 Pump KCI Dry Job. -Blow down Top Drive. -Flow Check Well. -Static. -POH f/ 6,849' to 1,247' md. -Mud Wt In= 9.0 ppg, Mud Wt Out= 9.0+ ppg. 12/13/2007 00:00 - 00:30 0.50 DRILL P PROD1 POH f/ 1,247' to 395' and (BHA). -Flow Check Well. -Static. 00:30 - 01:00 0.50 DRILL P PROD1 Stand back HWDP, Jars, Non-Mag Flex DCs. -UD Circ Sub. 01:00 - 03:30 2.50 DRILL P PROD1 PJSM- Handling Nuclear Sources. -Pull Nukes. -Download MWD. -L/D Telemetry tool. -Stand Back MWD. -L/D Stabilizer, Float Sub, Motor & Bit. 03:30 - 04:30 1.00 DRILL P PROD1 P/U & M/U PDC Bit, 1.5 degree bent Motor, Float Sub, Stabilizer, MWD, PWD & Telemetry tool. ~, 04:30 - 06:30 2.00 DRILL P PROD1 Upload & Shallow Test MWD. ~~, -Install Nukes. 06:30 - 07:00 0.50 DRILL P PROD1 RIH w/ DCs. -M/U Circ Sub, HWDP & Jars to 406' md. 07:00 - 09:00 2.00 DRILL P PROD1 RIH w/ 4" HT-38 DP f/ 406' to 6,860' md. -Fill pipe every 25 stds. 09:00 - 10:30 1.50 DRILL P PROD1 Cut & Slip Drilling Line. -Service Top Drive. 10:30 - 12:00 1.50 DRILL P PROD1 Orient 14 degrees right of High Side and Exit Window. -No drag noted while going through window. -RIH w/ 4' HT-38 DP to 7,993' md. -Wash last stand to bottom (8,086' md). 12:00 - 00:00 12.00 DRILL P PROD1 Directionally Drill Ahead f/ 8,086' to 8,926' md. -P/U= 150K, SOW= 70K, Rot Wt= 100K. -250 gpm / psi off= 1610, psi on= 1770. -80 rpm / Tq off= 6K, Tq on= 7K. W06= 3. -AST= 1.58, ART= 4.30, ADT= 5.88. -Pump 40 bbl Hi-Vis Sweeps @ 8,486' md, 8,880' md, & 8,921' md. -5% increase in cuttings w/ first sweep. -10% increase in cuttings w/ second sweep. -3% increase in cuttings w/ third sweep. 12/14/2007 00:00 - 12:00 12.00 DRILL P PROD1 Directionally Drilling Ahead f/ 8,926' and to 9,707' md. -P/U= 130K, SOW= 75K, Rot Wt= 100K. - 245 gpm / psi off= 1770, psi on= 1940. - 80 rpm / Tq off= 4K, Tq on= 5K. WOB= 3K. -AST= 1.29, ART= 4.12, ADT= 5.41. -40 bbl Hi Vis/ Nut Plug Sweep pumped @ 9,335' md. -No increase in cuttings observed. 12:00 - 00:00 12.00 DRILL P PROD1 Directionally Drill Ahead f/ 9,707' to 10,428' md. Printed: 1/7/2008 3:36:39 PM s ~ BP AMERICA Page 11 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations .12/14/2007 12:00 - 00:00 12.00 DRILL P PROD1 -P/U= 125K, SOW= 75K, Rot Wt= 100K. - 245 gpm / psi off= 1770, psi on= 1940. - 80 rpm / Tq off= 5K, Tq on= 5K. WOB= 3K. -AST= 3.80, ART= 1.34, ADT= 5.14. -40 bbl Hi Vis /Nut Plug Sweep pumped @ 10,239' md. -No increase in cuttings observed. 12/15/2007 00:00 - 06:00 6.00 DRILL P PROD1 Directionally Drill Ahead f/ 10,428' to TD @ 10,780' md. / 4,189' tvd. -P/U= 125K, SOW= 75K, Rot Wt= 100K. -250 gpm / psi off= 1820, psi on= 2080. -80 rpm / Tq off= 4K, Tq on= 5K. W06= 5K -AST= .58, ART= 2.36, ADT= 2.94. -Pump 40 bbl Hi-Vis/ Nut Plug Sweep @ 10,679' md. -5% increase in cuttings observed. 06:00 - 09:00 3.00 DRILL P PROD1 Pump 40 bbl Hi-Vis /Nut Plug Sweep surface to surface. -Slight increase in cuttings observed. -CBU x 3. -250 gpm / 1970 psi. -Rotate @ 120 rpm & Reciprocate 1 std. -Flow Check well. -Static. 09:00 - 12:00 3.00 DRILL P PROD1 Back Ream & Mad Pass @ 300' per hour f/ 10,780' to 10,086' md. -245 gpm / 1750 psi. -100 rpm / Tq= 5K. 12:00 - 00:00 12.00 DRILL P PROD1 Back Ream & Mad Pass @ 300' per hr f/ 10,086' to 7,909' md. -245 gpm / 1520 psi. -100 rpm / Tq= 4K. 12/16/2007 00:00 - 04:30 4.50 DRILL P PROD1 Mad Pass f/ 7,909' to 6,956' md. -Pull thru window. -No overpull noted thru window. 04:30 - 05:00 0.50 DRILL P PROD1 CBU above window @ 6,860' md. -At BU, 50% reduction in cuttings on the shakers. -250 gpm / 1470 psi. -Rotate 40 rpm & Reciprocate. 05:00 - 07:00 2.00 DRILL P PROD1 RIH thru window. -No drag noted thru window. -RIH f/ 6,956' to 10,780' md. -Fill every 20 stds. -Wash last std to bottom. 07:00 - 09:30 2.50 DRILL P PROD1 Pump 40 bbl Hi-Vis Sweep. -No increase in cuttings observed from sweep. -CBU x 3. -300 gpm / 2490 psi. -Rotate @ 120 rpm & Reciprocate 1 std. -Flow Check Well. -Static. -Obtain parameters: P/U= 125K, SOW= 85, Rot Wt.= 104K. Tq= 4K. 09:30 - 12:00 2.50 DRILL P PROD1 POH f/ 10,780' to 8,383' md. -Spot Liner Running Pill while POH. -85 gpm / 540 psi. 12:00 - 14:00 2.00 DRILL P PROD1 POH f/ 8,383' to 6,860' md. -Spot Liner Running Pill while POH. -85 gpm / 500 psi. 1/7/2008 3~3fi:39 PM ~ ~ BP AMERICA Page 12 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date I From - To Hours ( Task I Code I NPT `Phase Description of Operations 12/16/2007 14:00 - 15:00 1.00 DRILL P PROD1 Flow Check Well. -Static. -Drop ball and open Circ Sub. -400 gpm / 1050 psi. -Rotate @ 40 rpm / Tq= 2-3K. -Flow Check Well. -Static. -Pump Dry Job. -Blow Down Top Drive. 15:00 - 17:30 2.50 DRILL P PROD1 POH f/ 6,860' to 406' md. -Flow Check Well. -Static. 17:30 - 21:30 4.00 DRILL P PROD1 Rack back HWDP. -L/D 2 Non-Mag DCs. -PJSM -Nuclear Sources. -Pull Nukes. -Download MWD. -L/D Non-Mag DC, MWD tools, Stabilizer, Float Sub, Motor & Bit. 21:30 - 22:00 0.50 DRILL P PROD1 Clear Rig floor of BHA. -Drain BOP Stack. 22:00 - 22:30 0.50 BOPSU P PROD1 Pull wear ring. -Set Test plug. 22:30 - 23:00 0.50 BOPSU P PROD1 R/U all BOP test equipment. -Fill all necessary lines and Choke. 23:00 - 00:00 1.00 BOPSU P PROD1 PJSM -BOP testing. -Test Annular, HCR Kill & Choke, Top Rams, Choke Valves # 1,12, 13, 14 & IBOP valves. -Test using AOGCC & BP regulations & procedures. -All tests 250 psi low / 3500 psi high. -All tests held for 5 minutes & charted. -Test witnessed by WSL &Tourpusher. -John Crisp, AOGCC, waived witness of the test. 12/17/2007 00:00 - 03:30 3.50 BOPSU P PROD1 Continue BOP Test. -Test using AOGCC & BP regulations & procedures. -All tests 250 psi low / 3500 psi high. -All tests held for 5 minutes & charted. -Test witnessed by WSL &Tourpusher. -John Crisp, AOGCC, waived witness of the test. -Good Test. 03:30 - 04:30 1.00 BOPSU P PROD1 R/D BOP test equipment. -Install Wear ring. -Blow down Choke manifold and Kill line. 04:30 - 10:30 6.00 CASE P RUNPRD PJSM -Running Liners. -R/U tongs & equipment for Liner. -Run 4 1/2" 12.6# L-80 IBT-M Slotted liner assembly to 4,098' md. -Run 78 Volant centralizers. -1 centralizer per jt of slotted liner except jts #1 & 2. 10:30 - 12:00 1.50 CASE P RUNPRD P/U 4 1!2" Liner/ Hanger/ Packer. -RIH on 4" DP f/ 4,098' md. to Top of Window @ 6,871' md. -Record P/U & SOW every 10 stds. -P/U= 111 K, SOW= 93K @ window. 12:00 - 14:00 2.00 CASE P RUNPRD Continue RIH on 4" DP f/ 6,871' to 10,780' md. -No drag noted thru window. -Record P/U & SOW every 10 stds. Printed: 1/7/2008 3:36:39 PM BP AMERICA Page 13 of 14 `Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Spud Date: 11/29/2007 Event Name: DRILL+COMPLETE Start: 11/23/2007 End: Contractor Name: DOYON DRILLING INC. Rig Release: 12/19/2007 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT .Phase Description of Operations 12/17/2007 12:00 - 14:00 2.00 CASE P RUNPRD -P/U= 128K, SOW= 90K @ TD. 14:00 - 16:30 2.50 CASE P RUNPRD Tag bottom. -Drop 1 3/4" ball and pump onto seat. -89 gpm / 380 psi. -Set Liner Hanger by setting down 30K. -Pressure up to 4,000 psi to set Liner Packer. -Set down 35K to verify Packer engagement. -Pressure test liner to 2,000 psi. Chart & hold for 30 min. -Good test. -Shoe is @ 10,778' md. Top of Packer is @ 6,700' md. 16:30 - 18:00 1.50 CASE P RUNPRD Clear Rig Floor. -Blow down Top Drive & Choke & Kill lines. -Bring 4" DP thread protectors to Rig Floor. 18:00 - 20:00 2.00 CASE P RUNPRD PJSM -Displacing Fluids in Well. -Rack back 1 std of 4" DP. - Pump two 40 bbl spacers. -Spacer #1 - Hi Vis / SafeKleen Brine. -Spacer #2 - Hi Vis Brine. -Chase w/ 388 bbls of 9.3 ppg Brine. -Ensure clean brine from Top of Packer to Surface. -270 gpm / 1270 psi. -Flow Check Well. -Static. -Blow Down Top Drive. 20:00 - 23:30 3.50 CASE P RUNPRD PJSM -Laying Down DP. - POH & UD 4" to pipe shed f/ 6,700' to 2,500' md. 23:30 - 00:00 0.50 CASE P RUNPRD RIH w/ 4" DP remaining in the Derrick f/ 2,500' to 3,900' md. 12/18/2007 00:00 - 01:30 .1.50 CASE P RUNPRD RIH w/ 4" DP from Derrick. -3,900' to 6,600' md. 01:30 - 03:00 1.50 CASE P RUNPRD PJSM -Slip & Cut Drilling Line -Slip & Cut Drilling line. -Service Top Drive. -Pump Brine thru 4" DP. 03:00 - 08:00 5.00 CASE P RUNPRD UD 4" DP to Pipe Shed f/ 6,600' md. to BHA. 08:00 - 08:30 0.50 CASE P RUNPRD Service brake and LD baker tools 08:30 - 09:30 1.00 CASE P RUNPRD RIH and LD remaining HWDP and jars -Pull wear bushing - Clear rig floor 09:30 - 12:00 2.50 RUNCO RUNCMP PJSM - RU to run tubing w/ ESP completion equipment 12:00 - 16:00 4.00 RUNCO RUNCMP PJSM - MU ESP assy + 1 pup jt. Fill with oil. Pull cable to floor, hang shieve and tie into pump. Check connection. 16:00 - 00:00 8.00 RUNCO RUNCMP RIH w/ ESP completion on 2-7/8" 6.5# L-80 EUE 8Rd tubing 1 x 1 f/ pipe shed. Fill pipe every 2,000' and break circulation: @ 2,000' - 1 bpm / 320 psi ; @ 4,000' - 1 bpm / 510 psi. Check cable conductivity every 2,000' 12/19/2007 00:00 - 02:00 2.00 RUNCO RUNCMP Cont. RIH ESP completion on 2-7/8" 6.5# L-80 EUE 8Rd tubing 1 x 1 f/ pipe shed. Total jts run: 210. Install a total of 117 LaSalle Cast Cable Protectors. 02:00 - 07:00 5.00 RUNCO RUNCMP MU pump in sub and circulate 300 bbls clean 9.3 ppg brine down tubing - 1 bpm / 1,500 psi. 07:00 - 10:00 3.00 RUNCO RUNCMP MU landing hanger and landing jt -Cut ESP cable, prepare and connect to penetrator. Test 10:00 - 11:00 1.00 RUNCO RUNCMP Land tubing hanger - RILDS - LD landing joint and install TWC. Printed: 1/7/200A 33A39 PISA BP AMERICA Page 14 of 14 Operations Summary Report Legal Well Name: MPH-19 Common Well Name: MPH-19 Event Name: DRILL+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date ~ From - To I Hours Task Code I NPT Spud Date: 11/29/2007 Start: 11/23/2007 End: Rig Release: 12/19/2007 Rig Number: Phase Description of Operations 12/19/2007 110:00 - 11:00 I 1.00 11:00 - 11:30 I 0.50 11:30 - 13:30 I 2.00 BOPSUI~P 13:30 - 16:00 2.50 WHSUR I P 16:00 - 17:30 I 1.501 WHSUR I P 17:30 - 18:30 I 1.00 I WHSUR I P 18:30 - 22:00 i 3.501 WHSUR I P 22:00 - 23:00 I 1.001 WHSUR I P 23:00 - 00:00 I 1.00 I WHSUR I P RUNCMP Test f/above to 1,000 psi x 10 min on chart Bottom of ESP assy @ 6,650' / X-Nipple @ 2,060' / GLM with dummy valve @ 202' PUW = 84k /SOW = 75k (Block wt = 50k) RUNCMP Blow down kill and choke lines - LD tongs and tubing equipment -Vac out stack RUNCMP PJSM - ND BOP RUNCMP NU tree -Tighten adapter flange and test to 5,000 psi x 10 min -Orient tree -Final tie in on ESP cable and test of conductivity. Tests good. RUNCMP RU to test tree -Test tree w/diesel to 3,500 psi x 10 min - RD testing equipment RUNCMP RU DSM lubricator and test to 500 psi -Pull TWC - RD lubricator RUNCMP RU Little Red and lines to IA and tubing -Test lines -Pump 95 bbls diesel down IA taking returns out tubing, 1 bpm / 750 - 850 psi (total returns of 39 bbls) -Bullhead 18 bbls of diesel down tubing, 1 bpm / 1,250 psi -Suck lines and RD Little Red RUNCMP RU DSM lubricator and test to 500 psi -Install BPV - RD lubricator NOTE: 500 psi pressure on tubing before installing BPV RUNCMP Secure well -Install gauges and check pressures -Release rig OA = 250 psi / IA = 400 psi / TBG = 0 psi Printed: 1R/2008 3:36:39 PM BP AMERICA Page 1 of 1 Leak-Off Test Summary Legal Name: MPH-19 Common Name: MPH-19 Test Date Test Type. Test Depth (TMD) T®st Depth (TVD) AMW' Surface;Pressure Leak Off Pressure (BHP) EMW 12/4/2007 FIT 3,845.0 (ft) 2,919.0 (ft) 8.70 (ppg) 425 (psi) 1,744 (psi) 11.50 (ppg) • ~J Printed: 1/7/2008 3:36:32 PM • Sperry Drilling Services Survey Report Comp~nv: BPAmOCO Date: 1/7/2008 Time: 15:23:51 1<i~c: 1 ~I Field: Milne Point Co-ordinalelNL) Reference: Well: MPH-19, True North Site: M Pt H Pad ~ ertical fTVD) Kefer cncc: MPH-19: 70.0 , ~ ) 0 OOu e l l 0 21.31A ) ~_Ht~llpath: MPH-19L1 _ . r Itrtiai 1\ Snrvc~ Ca lc Iclhod: Min i m u_m Cu b: Oracle i D Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1 927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Well: MPH-19 Slot Name: 5002923371 Well Position: +N/-S 1124.53 ft Northing : 6010104.59 ft Latitude: 70 26 17.724 N +E/-W 1115.91 ft Easting : 556512.33 ft Longitude: 149 32 21.142 W Position Uncertainty: 0.00 ft Wellpath: MPH-19L1 Drilled From: MPH-19 5002923371 60 Tie-on Depth: 6870.99 ft Current Datum: MPH -19: Height 70.00 ft 'Above System Datum: Mean Sea Level Magnetic Data: 11/28/2007 Declination: 23.12 deg Field Strength: 57636 nT Mag Dip Angle: 80.91 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.10 0.00 0.00 121.31 Survey Program for Definitive Wellpath Date: 1/7/2008 Validated: Yes Version: 7 Actual From To Survey Toolcode Tool Name ft ft 100.00 6858.76 MPH-19 MWD-IFR-MS Sperry (100. MWD+IFR+MS MWD +IFR + Multi Station 6871.00 10730.35 MPH-19L1 M WD-IFR-M S Sperry (68 MWD+IFR+MS MWD +IFR + Multi Station Survey D'ID lncl Azim TVD Sys T~'D N/S L/~V DIapN D1apE Tool '~ ft deg. deg ft ft ft ft ft ft 34.10 0.00 0.00 34.10 -35.90 ° 0.00 0.00 6010104.59 - 556512.33 • TIE LINE i 00.00 0.45 66.42 100.00 30.00 0.10 0.24 6010104.70 556512.57 MWD+IFR+MS 165.00 1.03 14.48 164.99 94.99 0.77 0.62 6010105.37 556512.94 MWD+IFR+MS 233.00 2.94 0.54 232.95 162.95 3.11 0.79 6010107.70 556513.09 MWD+IFR+MS 261.00 3.14 1.07 260.91 190.91 4.59 0.81 6010109.19 556513.10 MWD+IFR+MS 354.00 3.52 357.58 353.75 283.75 9.99 0.73 6010114.59 556512.99 MWD+IFR+MS 444.00 3.93 352.93 443.56 373.56 15.81 0.24 6010120.40 556512.45 MWD+IFR+MS 535.00 3.97 6.35 534.35 464.35 22.04 0.20 6010126.63 556512.37 MWD+IFR+MS 625.00 3.80 25.05 624.15 554.15 27.84 1.81 6010132.44 556513.93 MWD+IFR+MS 720.00 2.72 27.70 718.99 648.99 32.68 4.19 6010137.30 556516.27 MWD+IFR+MS 812.47 3.01 40.28 811.35 741.35 36.48 6.78 6010141.12 556518.83 MWD+IFR+MS 859.08 3.11 37.55 857.89 787.89 38.41 8.34 6010143.06 556520.38 MWD+IFR+MS 951.35 3.34 35.87 950.01 880.01 42.58 11.44 6010147.25 556523.45 MWD+IFR+MS 1045.79 3.79 41.45 1044.27 974.27 47.15 15.12 6010151.85 556527.09 MWD+IFR+MS 1140.75 4.39 41.68 1138.99 1068.99 52.21 19.62 6010156.95 556531.55 MWD+IFR+MS 1235.35 7.24 36.23 1233.09 1163.09 59.73 25.55 6010164.50 556537.42 MWD+IFR+MS 1330.36 10.72 35.57 1326.92 1256.92 71.75 34.23 6010176.59 556546.01 MWD+IFR+MS 1422.85 13.28 35.14 1417.39 1347.39 87.43 45.35 6010192.36 556557.01 MWD+IFR+MS 1518.48 13.36 35.34 1510.44 1440.44 105.43 58.06 6010210.45 556569.58 MWD+IFR+MS 1610.08 14.37 36.28 1599.37 1529.37 123.23 70.91 6010228.34 556582.30 MWD+IFR+MS 1696.05 18.94 30.19 1681.72 1611.72 143.90 84.25 6010249.11 556595.47 MWD+IFR+MS 1798.87 21.84 28.01 1778.09 1708.09 175.21 101.62 6010280.55 556612.61 MWD+IFR+MS 1894.54 22.02 29.28 1866.84 1796.84 206.57 118.75 6010312.03 556629.50 MWD+IFR+MS 1989.54 23.62 29.49 1954.40 1884.40 238.67 136.83 6010344.27 556647.34 MWD+IFR+MS 2084.97 27.53 32.00 2040.46 1970.46 274.03 157.94 6010379.78 556668.17 MWD+IFR+MS 2180.05 30.89 33.56 2123.44 2053.44 313.01 183.08 6010418.95 556693.02 MWD+IFR+MS 2273.97 35.30 34.67 2202.11 2132.11 355.44 211.86 6010461.59 556721.47 MWD+IFR+MS 2369.45 40.17 37.32 2277.60 2207.60 402.65 246.25 6010509.06 556755.49 MWD+IFR+MS 2464.18 43.93 37.23 2347.93 2277.93 453.13 284.67 6010559.82 556793.53 MWD+IFR+MS • Sperry Drilling Services Survey Report Company: BP Amoco llatc: 1/7/2008 Timc: 15:23:51 Page: 2 Field: Ml lne Point Co-ord inateftiE) Re ference: Well: MPH-19, True North Site: M Pt H Pad Vertica l ITVD) Refe rence: MPH -19: 70.0 ~~'cll: MPH-19 Section (VS) KeYerc nce: Well (O.OON,O.OOE, 121.31 Azi) bVellpath: MPH-19L1 Survey Calculation 1 11cthod: Minim um Curvature llb: Oracle Su n cy T~~ID Iucl Azim l'VD Sys'fVll N/S F/W 1~'IapN NIapE '1'001 ft deg deg ft ft ft ft ft ft 2548.27 45.93 38.48 - - 2407.46 _ 2337.46 __- 500.01 -- 321.12 6010606.97 556829.62 MWD+IFR+MS 2642.51 51.34 38.25 2469.72 2399.72 555.45 364.99 6010662.74 556873.07 MWD+IFR+MS 2745.71 56.79 38.55 2530.26 2460.26 620.91 416.88 6010728.58 556924.46 MWD+IFR+MS 2840.31 60.96 38.59 2579.15 2509.15 684.21 467.36 6010792.25 556974.45 MWD+IFR+MS 2935.31 64.50 38.04 2622.67 2552.67 750.46 519.70 6010858.89 557026.28 MWD+IFR+MS 3029.19 67.33 37.65 2660.98 2590.98 818.13 572.28 6010926.95 557078.33 MWD+IFR+MS 3122.27 67.60 36.65 2696.65 2626.65 886.66 624.19 6010995.86 557129.73 MWD+IFR+MS 3218.95 70.70 37.98 2731.06 2661.06 958.49 678.96 6011068.11 557183.94 MWD+IFR+MS 3313.36 70.89 38.38 2762.11 2692.11 1028.58 734.07 6011138.60 557238.52 MWD+IFR+MS 3407.44 70.50 38.89 2793.22 2723.22 1097.93 789.51 6011208.37 557293.42 MWD+IFR+MS 3502.99 70.50 38.90 2825.11 2755.11 1168.03 846.06 6011278.89 557349.44 MWD+IFR+MS 3598.35 70.94 37.47 2856.60 2786.60 1238.78 901.71 6011350.05 557404.54 MWD+IFR+MS 3691.80 70.81 37.66 2887.22 2817.22 1308.77 955.53 6011420.44 557457.83 MWD+IFR+MS 3775.42 70.36 37.75 2915.01 2845.01 1371.17 1003.77 6011483.19 557505.58 MWD+IFR+MS 3833.42 69.49 38.57 2934.92 2864.92 1414.00 1037.42 6011526.27 557538.91 MWD+IFR+MS 3925.75 67.99 38.12 2968.40 2898.40 1481.48 1090.81 6011594.15 557591.77 MWD+IFR+MS 4020.71 69.64 39.38 3002.72 2932.72 1550.53 1146.23 6011663.61 557646.67 MWD+IFR+MS 4115.68 69.30 39.23 3036.02 2966.02 1619.35 1202.57 6011732.85 557702.48 MWD+IFR+MS 4208.85 67.57 44.24 3070.28 3000.28 1683.99 1260.20 6011797.92 557759.62 MWD+IFR+MS 4304.47 66.18 44.08 3107.84 3037.84 1747.08 1321.47 6011861.46 557820.39 MWD+IFR+MS 4398.97 65.25 46.78 3146.71 3076.71 1807.52 1382.82 6011922.36 557881.28 MWD+IFR+MS 4493.48 64.65 49.80 3186.73 3116.73 1864.49 1446.72 6011979.80 557944.74 MWD+IFR+MS 4584.70 63.78 54.71 3226.43 3156.43 1914.75 1511.63 6012030.56 558009.27 MWD+IFR+MS 4678.83 62.13 58.61 3269.24 3199.24 1960.83 1581.64 6012077.16 558078.91 MWD+IFR+MS 4774.85 62.89 63.19 3313.58 3243.58 2002.23 1656.04 6012119.12 558152.99 MWD+IFR+MS 4869.67 64.95 66.84 3355.28 3285.28 2038.17 1733.23 6012155.64 558229.90 MWD+IFR+MS 4963.92 64.64 70.72 3395.43 3325.43 2069.04 1812.70 6012187.10 558309.12 MWD+IFR+MS 5058.25 65.83 76.31 3434.97 3364.97 2093.31 1894.79 6012211.99 558391.02 MWD+IFR+MS 5152.55 65.31 80.60 3473.98 3403.98 2110.49 1978.89 6012229.81 558474.98 MWD+IFR+MS 5248.11 65.99 84.96 3513.40 3443.40 2121.42 2065.23 6012241.40 558561.22 MWD+IFR+MS 5344.07 65.67 89.32 3552.71 3482.71 2125.79 2152.64 6012246.43 558648.59 MWD+IFR+MS 5439.55 64.95 92.86 3592.60 3522.60 2124.15 2239.35 6012245.44 558735.31 MWD+IFR+MS 5533.08 65.36 97.07 3631.91 3561.91 2116.80 2323.88 6012238.74 558819.88 MWD+IFR+MS 5624.13 64.85 101.80 3670.26 3600.26 2103.28 2405.32 6012225.83 558901.42 MWD+IFR+MS 5719.70 64.98 105.32 3710.79 3640.79 2082.98 2489.45 6012206.18 558985.68 MWD+IFR+MS 5813.96 65.88 109.64 3749.99 3679.99 2057.23 2571.19 6012181.05 559067.60 MWD+IFR+MS 5908.51 66.32 112.55 3788.31 3718.31 2026.12 2651.82 6012150.55 559148.47 MWD+IFR+MS 6002.66 68.45 117.16 3824.53 3754.53 1989.58 2730.64 6012114.61 559227.55 MWD+IFR+MS 6105.86 69.10 121.21 3861.90 3791.90 1942.68 2814.60 6012068.35 559311.86 MWD+IFR+MS 6198.37 67.63 125.32 3896.02 3826.02 1895.54 2886.49 6012021.76 559384.09 MWD+IFR+MS 6295.36 68.49 127.79 3932.26 3862.26 1841.95 2958.75 6011968.73 559456.75 MWD+IFR+MS 6389.07 65.51 128.14 3968.88 3898.88 1788.90 3026.75 6011916.20 559525.14 MWD+IFR+MS 6484.16 64.99 129.06 4008.69 3938.69 1735.02 3094.23 6011862.84 559593.03 MWD+IFR+MS 6578.19 68.33 127.14 4045.94 3975.94 1681.78 3162.17 6011810.12 559661.36 MWD+IFR+MS 6672.95 68.28 126.62 4080.97 4010.97 1628.94 3232.60 6011757.82 559732.18 MWD+IFR+MS 6766.48 68.09 127.55 4115.72 4045.72 1576.58 3301.87 6011705.99 559801.84 MWD+IFR+MS / 6858.76 71.20 126.41 4147.82 4077.82 1524.55 3370.98 6011654.49 559871.34 MWD+IFR+MS / 6871.00 71.74 126.57 4151.71 4081.71 1517.65 3380.31 6011647.66 559880.72 MWD+IFR+MS 6895.16 74.82 128.31 4158.66 4088.66 1503.58 3398.68 6011633.74 559899.19 MWD+IFR+MS 6927.34 78.26 130.56 4166.15 4096.15 1483.70 3422.84 6011614.04 559923.50 MWD+IFR+MS 6959.38 81.83 132.74 4171.69 4101.69 1462.73 3446.41 6011593.25 559947.23 MWD+IFR+MS 6987.12 83.94 134.60 4175.12 4105.12 1443.73 3466.32 6011574.40 559967.28 MWD+IFR+MS Sperry Drilling Services Survey Report Company: BP AmoCO Field: Milne Point Site: M Pt H Pad ~S'cll: MPH-19 Wellpath: MPH-19L1 Suncv Date: 1/7/2008 Time: 15:23:51 Page: 3 Co-ordinafe(NLj Reference: Well: MPH-19, True North Vertical (TVll1 Kcfercnee: MPH-19: 70.0 Section fVS) Reference: Well (O.OON,O.OOE,121.31Azi) Survec Calculation Dlethod: Minimum Curvature Db: Oracle i 1 Incl Aim TVD S~~s TVll N/S ElW DlapA' NIapE Tool ~i ft deg deg ft ft ft ft ft ft 7022.41 86.91 136.93 4177.94 4107.94 1418.53 3490.86 6011549.39 559992.00 MWD+IFR+MS 7053.60 90.87 138.98 4178.54 4108.54 1395.37 3511.73 6011526.40 560013.05 MWD+IFR+MS 7085.71 93.40 141.09 4177.35 4107.35 1370.78 3532.34 6011501.97 560033.84 MWD+IFR+MS 7119.51 95.01 142.26 4174.87 4104.87 1344.34 3553.25 6011475.69 560054.94 MWD+IFR+MS 7151.12 92.04 140.53 4172.93 4102.93 1319.69 3572.93 6011451.19 560074.81 MWD+IFR+MS 7183.96 88.77 138.83 4172.69 4102.69 1294.65 3594.17 6011426.32 560096.24 MWD+IFR+MS 7226.80 89.39 139.08 4173.38 4103.38 1262.35 3622.30 6011394.23 560124.61 MWD+IFR+MS 7280.62 89.86 139.61 4173.73 4103.73 1221.52 3657.36 6011353.67 560159,98 MWD+IFR+MS 7310.25 89.26 140.45 4173.96 4103.96 1198.81 3676.40 6011331.11 560179.18 MWD+IFR+MS 7341.85 89.88 143.61 4174.20 4104.20 1173.91 3695.84 6011306.35 560198.81 MWD+IFR+MS 7374.22 90.79 147.03 4174.01 4104.01 1147.29 3714.25 6011279.88 560217.42 MWD+IFR+MS 7406.43 90.25 149.18 4173.72 4103.72 1119.95 3731.27 6011252.67 560234.64 MWD+IFR+MS 7437.26 90.80 152.00 4173.43 4103.43 1093.09 3746.40 6011225.94 560249.98 MWD+IFR+MS 7468.99 91.11 155.36 4172.91 4102.91 1064.66 3760.47 6011197.61 560264.26 MWD+IFR+MS 7501.36 90.00 157.08 4172.59 4102.59 1035.04 3773.52 6011168.10 560277.54 MWD+IFR+MS 7533.42 90.54 160.07 4172.44 4102.44 1005.20 3785.23 6011138.35 560289.47 MWD+IFR+MS 7564.64 91.91 162.96 4171.77 4101.77 975.60 3795.12 6011108.83 560299.59 MWD+IFR+MS 7596.10 91.67 165.50 4170.79 4100.79 945.35 3803.67 6011078.64 560308.36 MWD+IFR+MS 7628.04 91.04 167.23 4170.03 4100.03 914.32 3811.20 6011047.67 560316.12 MWD+IFR+MS 7660.27 90.36 169.37 4169.64 4099.64 882.76 3817.73 6011016.17 560322.90 MWD+IFR+MS 7690.67 89.69 171.87 4169.63 4099.63 852.77 3822.69 6010986.22 560328.08 MWD+IFR+MS 7722.76 89.81 174.62 4169.77 4099.77 820.90 3826.46 6010954.39 560332.09 MWD+IFR+MS 7750.99 90.06 177.82 4169.80 4099.80 792.74 3828.32 6010926.24 560334.17 MWD+IFR+MS 7787.24 91.41 180.20 4169.33 4099.33 756.50 3828.95 6010890.01 560335.07 MWD+IFR+MS 7817.88 92.89 181.32 4168.19 4098.19 725.89 3828.54 6010859.40 560334.89 MWD+IFR+MS 7846.50 92.78 182.20 4166.77 4096.77 697.32 3827.66 6010830.82 560334.23 MWD+IFR+MS 7891.87 93.08 180.57 4164.45 4094.45 652.02 3826.57 6010785.52 560333.48 MWD+IFR+MS 7944.14 93.32 179.64 4161.53 4091.53 599.83 3826.47 6010733.34 560333.78 MWD+IFR+MS 7988.28 93.20 179.16 4159.02 4089.02 555.77 3826.93 6010689.29 560334.57 MWD+IFR+MS 8038.21 93.34 179.38 4156.17 4086.17 505.92 3827.57 6010639.45 560335.59 MWD+IFR+MS 8089.92 94.08 179.33 4152.83 4082.83 454.32 3828.15 6010587.86 560336.56 MWD+IFR+MS 8140.18 93.65 178.71 4149.44 4079.44 404.19 3829.01 6010537.74 560337.80 MWD+IFR+MS 8190.11 92.60 178.54 4146.72 4076.72 354.35 3830.20 6010487.91 560339.37 MWD+IFR+MS 8236.23 91.12 178.96 4145.22 4075.22 308.26 3831.21 6010441.84 560340.72 MWD+IFR+MS 8285.80 90.31 179.10 4144.60 4074.60 258.70 3832.05 6010392.30 560341.94 MWD+IFR+MS 8330.02 90.73 177.22 4144.20 4074.20 214.51 3833.47 6010348.12 560343.69 MWD+IFR+MS 8376.82 90.25 180.50 4143.80 4073.80 167.73 3834.40 6010301.35 560344.98 MWD+IFR+MS 8430.24 90.56 180.96 4143.42 4073.42 114.31 3833.72 6010247.94 560344.70 MWD+IFR+MS 8478.73 90.56 180.77 4142.95 4072.95 65.83 3832.99 6010199.46 560344.34 MWD+IFR+MS 8524.88 89.68 181.33 4142.85 4072.85 19.69 3832.14 6010153.32 560343.84 MWD+IFR+MS 8569.42 88.76 179.76 4143.46 4073.46 -24.84 3831.72 6010108.79 560343.76 MWD+IFR+MS 8616.90 88.21 178.31 4144.71 4074.71 -72.30 3832.52 6010061.34 560344.91 MWD+IFR+MS 8663.41 87.95 177.69 4146.27 4076.27 -118.75 3834.14 6010014.91 560346.89 MWD+IFR+MS 8709.69 89.56 176.38 4147.28 4077.28 -164.96 3836.53 6009968.72 560349.63 MWD+IFR+MS 8756.60 90.80 175.79 4147.13 4077.13 -211.76 3839.73 6009921.96 560353.19 MWD+IFR+MS 8810.20 90.99 175.95 4146.29 4076.29 -265.21 3843.59 6009868.54 560357.45 MWD+IFR+MS 8853.98 90.68 175.87 4145.66 4075.66 -308.87 3846.72 6009824.90 560360.91 MWD+IFR+MS 8900.39 90.56 174.57 4145.15 4075.15 -355.12 3850.58 6009778.69 560365.12 MWD+IFR+MS 8946.65 91.36 173.60 4144.38 4074.38 -401.13 3855.35 6009732.73 560370.24 MWD+IFR+MS 8998.99 91.79 174.51 4142.94 4072.94 -453.16 3860.77 6009680.74 560376.05 MWD+IFR+MS 9043.49 91.67 175.08 4141.60 4071.60 -497.46 3864.80 6009636.48 560380.42 MWD+IFR+MS 9094.86 90.87 174.98 4140.46 4070.46 -548.62 3869.25 6009585.35 560385.26 MWD+IFR+MS 9138.73 89.62 176.15 4140.27 4070.27 -592.36 3872.65 6009541.65 560388.98 MWD+IFR+MS Sperry Drilling Services Survey Report Company: BP Amoco Date: 1/7/2008 Time: 15:23:51 Page: 4 GicIJ: Mlln e Point Co-ord inate(NL) Re ference: Well: MPH-19, True North Sitr. M Pt H Pad Vertica l tTVD) Refe rence: MPH -19: 70.0 bVell: MP H-19 Section (VS} Refere nce: Well (O.OON,O.OOE,1 21.31Azi) ~Vcllpath: MP H-19L1 Survey Calculation D9ethod: Minim um Curvature Db: Oracle Survcc - _ - D~ID ind Azim T~'D _ Sys TVD _ N/S -- 1;/1'V - iV~1apN i•iapE Tool ft deg deg ft ft ft ft ft ft 9188.89 89.51 175.34 4140.65 4070.65 -642.38 3876.37 6009491.66 560393.08 MWD+IFR+MS 9231.10 89.56 175.12 4140.99 4070.99 -684.44 3879.88 6009449.63 560396.91 MWD+IFR+MS 9276.33 89.38 175.22 4141.41 4071.41 -729.51 3883.69 6009404.60 560401.06 MWD+IFR+MS 9325.50 90.56 175.98 4141.44 4071.44 -778.53 3887.46 6009355.61 560405.20 MWD+IFR+MS 9373.50 91.90 177.14 4140.41 4070.41 -826.43 3890.34 6009307.74 560408.44 MWD+IFR+MS 9420.71 90.99 177.16 4139.22 4069.22 -873.57 3892.68 6009260.63 560411.15 MWD+IFR+MS 9471.67 90.61 177.38 4138.51 4068.51 -924.47 3895.11 6009209.75 560413.96 MWD+IFR+MS 9514.57 90.87 177.91 4137.95 4067.95 -967.33 3896.87 6009166.91 560416.05 MWD+IFR+MS 9563.46 90.55 177.21 4137.35 4067.35 -1016.17 3898.95 6009118.09 560418.50 MWD+IFR+MS 9609.76 90.00 177.25 4137.12 4067.12 -1062.41 3901.19 6009071.87 560421.08 MWD+IFR+MS 9660.39 90.13 176.97 4137.07 4067.07 -1112.98 3903.74 6009021.33 560424.02 MWD+IFR+MS 9703.78 90.30 178.23 4136.90 4066.90 -1156.33 3905.56 6008978.00 560426.17 MWD+IFR+MS 9750.69 90.17 180.47 4136.71 4066.71 -1203.23 3906.09 6008931.10 560427.05 MWD+IFR+MS 9800.08 90.48 183.07 4136.43 4066.43 -1252.60 3904.57 6008881.74 560425.90 MWD+IFR+MS 9849.10 90.50 186.72 4136.01 4066.01 -1301.43 3900.39 6008832.88 560422.09 MWD+IFR+MS 9896.25 88.40 188.97 4136.46 4066.46 -1348.13 3893.95 6008786.14 560416.01 MWD+IFR+MS 9940.00 87.53 191.11 4138.02 4068.02 -1391.18 3886.33 6008743.03 560408.72 MWD+IFR+MS 9977.47 87.90 194.12 4139.51 4069.51 -1427.71 3878.15 6008706.45 560400.82 MWD+IFR+MS 10007.12 88.01 196.80 4140.57 4070.57 -1456.27 3870.26 6008677.83 560393.14 MWD+IFR+MS 10037.73 88.03 199.87 4141.63 4071.63 -1485.30 3860.63 6008648.73 560383.74 MWD+IFR+MS 10070.66 87.21 202.50 4143.00 4073.00 -1515.98 3848.75 6008617.97 560372.08 MWD+IFR+MS 10102.61 87.40 205.68 4144.50 4074.50 -1545.11 3835.72 6008588.74 560359.28 MWD+IFR+MS 10129.46 88.01 207.39 4145.57 4075.57 -1569.11 3823.74 6008564.65 560347.48 MWD+IFR+MS 10167.24 87.41 209.84 4147.08 4077.08 -1602.25 3805.66 6008531.38 560329.65 MWD+IFR+MS 10198.96 87.27 211.85 4148.56 4078.56 -1629.45 3789.41 6008504.06 560313.62 MWD+IFR+MS 10230.16 87.29 214.00 4150.04 4080.04 -1655.61 3772.47 6008477.78 560296.88 MWD+IFR+MS 10274.80 86.36 214.21 4152.51 4082.51 -1692.51 3747.48 6008440.69 560272.17 MWD+IFR+MS 10322.10 85.42 214.65 4155.90 4085.90 -1731.42 3720.81 6008401.58 560245.79 MWD+IFR+MS 10366.38 84.00 216.22 4159.98 4089.98 -1767.35 3695.25 6008365.46 560220.51 MWD+IFR+MS 10415.41 85.60 216.61 4164.43 4094.43 -1806.64 3666.26 6008325.96 560191.82 MWD+IFR+MS 10458.54 86.67 217.07 4167.33 4097.33 -1841.08 3640.46 6008291.33 560166.29 MWD+IFR+MS 10512.06 87.27 217.41 4170.16 4100.16 -1883.63 3608.12 6008248.54 560134.27 MWD+IFR+MS 10555.87 85.80 217.40 4172.81 4102.81 -1918.36 3581.56 6008213.61 560107.98 MWD+IFR+MS 10605.74 85.42 216.99 4176.63 4106.63 -1957.97 3551.50 6008173.78 560078.22 MWD+IFR+MS 10649.55 85.62 217.37 4180.05 4110.05 -1992.77 3525.10 6008138.78 560052.09 MWD+IFR+MS 10701.00 86.03 217.45 4183.79 4113.79 -2033.53 3493.93 6008097.79 560021.23 MWD+IFR+MS 10730.35 85.73 217.41 4185.90 4115.90 -2056.77 3476.14 6008074.41 560003.62 MWD+IFR+MS „ 10780.00 85.73 217.41 4189.60 4119.60 -2096.10 3446.06 6008034.86 ~ 559973.84 ~ PROJECTED to TD SARAH PALIN GOV ERNOR OBI ~ ~ ! 333 W. 7th AVENUE, SUITE 100 COIKSERQA~'IO1Q C011II1'IISSIOI~T f`/~ ANCHORAGE, ALASKA 99501-35 PHONE (907) 279-1433 Dan Kara FAx (907) 276-7542 Senior Drilling Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 39 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPH-19L1 BP Exploration Alaska, Inc. Permit No: 207-137 Surface Location: 2954' FSL, 4132' FEL, SEC. 34, T13N, R10E Bottomhole Location: 758' FSL, 760' FEL, SEC. 34, T13N, RlOE, UM Dear Mr. Kara: Enclosed is the approved application for permit to drill the above referenced redrill development well. The permit is for a new wellbore segment of existing well MPH-19, Permit No 207- 136, API No. 50-029-23371-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this day of October, 200? cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA /~~~ ALAS~IL AND GAS CONSERVATION COMMON 0(~*~ PERMIT TO DRILL 20 AAC 25.005 .. ~ ~ ..w ,, 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: MPH-19L1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 10974 TVD 4176 12. Field /Pool(s): Milne Point Unit / Schrader Bluff 4a. Location of Well (Governmental Section): Surface: 2954' FSL 4132' FEL SEC 34 T13N R10E 7. Property Designation: ADL 025906 , , . , , , (As Planned) Top of Productive Horizon: 4301' FSL, 506' FEL, SEC. 34, T13N, R10E, UM 8. Land Use Permit: 13. Approximate Spud Date: November 1, 2007 Total Depth: 758' FSL, 760' FEL, SEC. 34, T13N, R10E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 4570' 4b. Location of Well (State Base Plane Coordinates): Surface: x-556512 y-6010105 Zone-ASP4 10. KB Elevation Planned (Height above GL): 71~ feet 15. Distance to Nearest Well Within Pool: 150' from MPH-13 16. Deviated Wells: Kickoff Depth: 7312 feet Maximum Hole An le: 90.7 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1728 Surface: 1330 18. Casin Pr ram: S 'rations To - Settin De th -Bo ttom uanf of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 3803' 7171' 4151' 10974' 4176' Uncemented Slotted Liner 19. PRESE NT WELL CONDITION'SUMMARY (To be completed for Redrilt and Re-entry Operations) Total Depth MD (ft): 8177 Total Depth TVD (ft): 4260 Plugs (measured): None Effective Depth MD (ft): 8177 Effective Depth TVD (ft): 4260 Junk (measured): None Casing Length Size Cement_Volume MD TVD Conductor /Structural 112' 20" 260 sx Arctic Set A rox. 112' 112' Surface 3817' 13-1/2" 574 sx Dee Crete 247 sx LiteCrete 3817' 2920' Intermediate Production 8177' -7/8" 815 sx lass'G' 8177' 4260' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Paul Hanson, 564-4195 Printed Name Dan Kara Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~ ~ ~% .----^ Phone 564-5667 Date i~'c~ c`~l Sondra Stewman, 564-4750 Commission U e Onl Permit To Drill Numbero? /,3~0 API Number: 50-Oa9•®?33~1 600o Permit Approval See cover letter for Date: ~ ' ~ other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce Coalbed me_th/ane, gas hydr es, or gas contained shales: Samples Req'd: ^ Yes t1e7 No /Mud log Req'd: ^ Yes (~No ,~ ~ HZS Measures: ^ Yes ~No Tonal Survey Req'd: [)Yes ^ No Other: 3~~ ~ S ~ 3 ~7 ~~ C?~S ~~Ge~V'~C ~~ ~ D ~J/ APPROVED BY THE COMMISSION Date /~ ,COMMISSIONER Form 10-401 Revised 12/2005 `~/ (,Y / `/ id~~ Syl~fti~~/~uglj~te ORIGINAL ~~/ ~~/"/ ~' Milne Point Well MPH-19 Schrader OA Horizontal Producer Drilling and Completion Plan Summary Type of Well: Schrader Bluff OA Horizontal Producer C Surface Location: 2,954' FSL and 4,131' FEL (AS Planned) Section 34, T13N, R10E UM E = 556,512.44' N = 6,010,105.0' 9-7/8" Hole: Top OA (main bore 4.301 FSL and 506' FEL MPH-19) Section 34, T13N, R10E UM E = 560124.78 N = 6011480.07 Z = 4,150.90' TVD 9-7/8" Hole Top OB (main bore 3,869' FSL and 106' FEL MPH-19) Section 34, T13N, R10E UM E = 560528.63' N = 6011051.23' Z = 4,215.90' TVD 9-7/8" Hole TD (main bore 3,495' FSL and 5,230` FEL MPH-19) Section 35, T13N, R10E UM E = 560687.51' N = 6010677.87' Z = 4,260.30' TVD 6-3/4" OA Lateral (TD of Lateral 758' FSL and 760' FEL MPH-19L1) Section 34, T13N, R10E UM E = 559905.00' N = 6007935.00' Z = 4,175.90' TVD Distance to Pro ert line 4570' Distance to nearest well 150' from MPH-13 Estimated Start Date: 1 S November, 2007 Main Wellbore MPH-19 TMD: 8,177 TVD: 4,260 Max Inc: 84° KOP: 750' KBE: 71' Well Desi n: Main wellbore set u for possible future CTD OB Lateral Ob'ective: Schrader Bluff OA Lateral MPH-19L1 TMD: 10,974' TVD: 4,176 Max Inc: 90.7° KOP: 750' KBE: 71' Well Desi n: OA Horizontal Producer w/main wellbore set up for CTD OB Lateral Objective: Schrader Bluff OA, with possible future OB Lateral Maximum antici ated BHP: 1728 psi at 3,980' TVDss (NA Sand) Maximum surface ressure: 1330 psi (Based on a full column of gas at 0.1 psi/ft) Planned BOP Test ressure: 3500 psi 1 Mud Program 13-1/2" Surface Hole (0 - 3.817'1: MPH-19 Spud Densit PV YP API FL H 8.6 - 9.4 10 - 25 30-50 NC-8 8.5 - 9.5 9-7/8" Intermediate Hole (3.817' - 8.177'): MPH-19 LSND MD Densit PV YP H API Filtrate MBT 3817'-6638' 8.8-9.5 8-20 18-26 9.0-10.0 6-8 <25 6638'-8177' 9.5 14-20 18-26 9.0-10.0 6-8 <25 6-3/4" Production Hole (7.171' -10.974'): MPH-19L1 Flo-Pro NT MD Densit PV YP H API Filtrate MBT 7171'-10974' 9.0-9.3 10-16 22-28 9.0-9.5 6-8 <6 Casing/Tubing Program Hole Size Casin g Size Wt/Ft Grad e Conn Length Top MD Top TVD Bottom MD Bottom TVD 42 20* 92 H-40 Weld 112 0 0 112 112 13.5 10.75 45.5 L-80 BTC 3817 0 0 3817 2920 9.875 7.625 29.7 L-80 VAM TOP 7000 0 0 7000 4133 9.8 5 7.625 29.7 L-80 BTC-M 1177 7000 4133 4260 .75 MPH-19L1 .5 L- I T Slotted/blank 3803 7171 4151 10974 4176 - 2.875 6.5 L-80 EUE 8rd 6500 0 0 6500 4000 re-set Cement Program Casin Size 10-3/4"45.5 Ib/ft L-80 BTC Surface Casin Lead Slurry to surface. Excess 150% over gauge hole in PF, 40% Basis Excess in the remainder of the open hole. Top of tail cement 1000' MD above casing shoe. I Total Cement I Wash 115-bbl water I Volume: 513 bbl S acer 75-bbl 10.1-Ib/ al un-viscosified Mud ush II Sacer Lead 394 -Bbl, 574 sx of 10.7 Dee Crete - 3.85 ft /sx Tail 99-bbl, 247-sx 12.5 Ib/ al LiteCrete - 2.24ft /sx Temp ~60° F 2 Casin Size 7-5/8", 29.7#, L-80, VAM TOP/BTC-M Production Casin Basis Tail cement = 500' MD above the TUZC. 40% excess over au a hole. Total Cement Volume: 146.0 bbl Wash 5 bbl water 10 bbl CW 100 S acer 50 bbl of MudPush Tail 167.0 bbl, 815 sx `G' mixed at 15.8 Ib/ a) & 1.16 ft /sx Tem BHST ~80°F from SOR Evaluation Program 13-1/2" Section Open Hole: • DIR/GR/RES • InSite • Gyro surreys to depth beyond magnetic interference 9-7/8" Section Open Hole: . DIR/GR/RES • NEU/DEN/GeoTap • IFR/CASANDRA • InSite Cased Ho IT/CCL PDC mode 6-3/4" Section Open Hole: . DIR/GR/RES • NEU/DEN • IFR/CASANDRA • InSite /_ Formation Markers Formation Tops TMD (ft) TVDss (ft) BHP (psi) Surface Pressure as at 0.1 si/R EMW (Ib/gal) BPRF 1851 1750 760 585 8.4 TUZC 5638 3610 1567 1206 8.4 U nu-MA 5744 3655 1587 1221 8.4 U n u-M B 1 6059 3780 1641 1263 8.4 U nu-M62 6184 3825 1661 1279 8.4 U nu-MC 6257 3850 1672 1287 8.4 - SBF2-iVA 6637 3980 1728 1330 8:4 SBF1-NB 6732 4010 1043 642 5.0 Fault 70' DTNW 6855 4040 TSBD-To OA 7170 4080 1485 1077 7.0 TSBC-Base OA 7496 4115 1498 1087 7.0 TSBB-To OB 7767 4145 1509 1095 7.0 SBA5 -Base OB 7995 4170 1518 1101 7.0 Recommended Bit Program Hole Size Depth (TMD) Footage Bit Type TFA GPM 13-1/2 0-3,817' 3,817 Hughes MXC1 .70-.90 450-650 -7/8 3,817' - 8,177` 4,360' Hughes Christensen MXL-1X .50-.70 500-600 n 6-3/4 7,171' - 10,974' 3,662' Hycalog DTX613M .40-.50 200-300 Well Control Intermediate Hole • Diverter to be rigged up and tested on surface • Maximum anticipated BHP: 1,728 psi at 3,980' TVDss (NB Sand) • Maximum surface pressure: 1330 psi (Based on a full column of gas at 0.1 psi/ft) • Planned BOP test pressure: 3,500 psi • BOP Test Frequency: Every 14 days maximum. • Integrity tests: FIT to 11.5 Ib/gal 20' below the 10-3/4" shoe. • Kick tolerance: 51 bbls with 9.4 Ib/gal mud at the 10-3/4" shoe. • No FIT planned for the OA lateral • Planned completion fluid: Kill weight brine (9.3 ppg) with diesel cap. 4 Drilling Hazards & Contingencies • Running gravel and heavy clay problems have been encountered on some H-Pad wells • Gas Hydrafes have been reported on all H-Pad wells except one. The expected depth-range for encountering hydrates is 2,000' TVDss to 2,500' TVDss. Keep the mud as cool as possible while drilling by diluting with cold lake water. For cementing across this interval we will use low heat-of-hydration DeepCrete/LiteCrete Lost Circulation • Lost circulation is possible if elevated mud density is required for shallow gas or hydrate control. Expected Pressures • Pressures are expected to be 8.4 ppg or less. The NB sands are expected to be relatively depleted (5.0 ppg EMW), as are the Schrader Bluff Sands (7.0 ppg EMW). Pad Data Sheet • Please Read the H-Pad Data Sheet thoroughly. Hydrocarbons • Hydrocarbons are possible in the Ugnu & Schrader Bluff intervals. Gas-cut mud has been observed in the Schrader Bluff. Faults • Afault-crossing is expected in the Schrader Bluff sands in the mother-bore. The OA lateral will be drilled after the fault crossing (faulting possible but not expected in the lateral). Hydrogen Sulfide • MPH Pad is not designated as an H2S Pad: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level MPH-14 < 2 ppm Jun-01 #2 Closest SHL Well H2S Level MPH-10 < 2 ppm Jun-01 #3 Closest SHL Well H2S Level MPH-13 < 2 ppm Jun-01 Max. Recorded H2S on Pad/Facility < 2 ppm Other Relevant H2S Data Last H2S data from 2001, Schrader wells typically have no H2S. I-pad data from Feb 2005 had 3.2 ppm at MPI-15 Anti-collision Issues The MPH-19 Mother-bore passes major risk with respect to all wells with the exception of MPH-14, which has been P&A'd. The close approach is at approximately 390'. MPH-19 is a replacement well for MPH-14. The MPH-19 lateral passes major risk with respect to all wellbores except MPH-13 and MPH-13A, which will be minor risked, as MPH-13 is presently Distance to Nearest Property • MPH-19L1 is planned to be 4570' from the nearest Milne Point property line. Distance to Nearest Well Within Pool • MPH-19L1 is 150' from the nearest sand penetration (MPH-13, which is P&A'd). 5 • i Doyon 14 contingency plan in the event of using Divert line H-Pad • Doyon 14 rig will have a Mine Point radio and will have met with H-Pad operator(s) and informed them of the placement of their Divert Line, who in turn will inform ALL personnel who will be doing work on the pad. • This Divert Line will have to be run near LIVE lines. Production, Test and Injection, due to space constraints on the pad. • In the event of using Divert Line, Doyon rig will call Miine Point control room board operator and request an ESD of H-Pad. • Doyon rig will then call Milne Point radio and inform them of action taken and why. Milne Point radio will make an announcement of restricted access to H-Pad. • Control room board operator will notify E and S-Pad operators and then initiate ESD for the pad shutting down production from all wells and all injection as well. The control room operator will also cut off electrical power to the pad. • The control room will then shut in XV-5873A the perimeter gas injection valve for H-Pad. • The control room board operator will shut in water injection for S and H-Pads with the corresponding perimeter valve XV-5310. To make up for the loss of injection, board operator may have to divert water to B-50 injection well. • Doyon rig will then correspond with H-Pad operator about situation who will then account for all personnel under their authority and direct them to safe area. S-Pad operator will make required adjustments for loss of water injection. • H-Pad operator will then verify pad is in ESD mode and all wells and corresponding equipment did in fact shut in and ALL ESP's shut down. • In the event that any other rig/wireline unit etc. is also on the pad they will have to be notified of any such action. • Once situation has been rectified Doyon rig will the notify the H-Pad operator, the control room board operator and Milne Point radio so provisions can be made to bring the pad back on line. 6 • Procedure Summary Pre-Rig Operations 1. MPH-14 surface location has been properly abandoned and prepped. 2. MPH-19 20" Conductor has been installed. Drilling 1. MIRU. NU Diverter. 2. Function test Diverter, PU 5" drill pipe and BHA 3. Drill 13-1/2" Hole to3817' MD/2920' TVD per directional plan. 4. Run and cement 10-3/4" casing. 5. ND diverter, install wellhead and NU/Test BOPE. ~~6. Drill 9-7/8" hole as per directional plan to 8177' MD/4260' TVD (180' below base OB). ~Q~ 7. Circulate hole clean and conduct GeoTap pressure sampling if available, MDT otherwise per geos. 8. RIH and condition hole for running casing. POH 9. Run and cement 7-5/8" casing (displace cement with Flo-Pro). 10. Run gauge ring/junk basket to insure casing is clear for packer setting. 11. Run USIT across window location at from TD to ~ 6500' minimum to insure good cement at window and isolation above and below (window depth estimated to be 7171'±). 12. Set Seal-bore, liner hanger and packer assembly to provide future CTD access to OB 13 14 15 II '~~~ 16 .k Q ~~'`` \ 17 18 19 20 21 22 Set whipstock at top of OA and mill window in 7-5/8" casing. While milling, condition Flo- Pro for drilling reservoir section Drill 6-3/4" OA lateral as per directional plan to 10,974' MD/4,176' TVD. Retrieve whipstock. Run 4-1/2" slotted liner (possibility of 4 swell packers with blank pipe to isolate water- swept zones) and hang off hook-wall in 7-5/8" casing. Displace drilling fluid to kill weight brine. Run 2-7/8" ESP completion. Land tubing hanger and test. ND BOPE. NU and test tree. Freeze-protect. RDMO. 7 by -~- - BP EXPLORATION ~, MP19-Mother-bore Field: Milne Point Schrader Bluff OA Horiz. Producer ENG: P. Hanson Pad: S-Pad (Main Wellbore for OA Lateral) RIG: Doyon 14 RKB: 70.9' DIR / LWD OH FORM DEPTH HOLE CASING Cement MWD LOGS MD TVD SIZE SPECS Slurry INFO 20" Conductor Wellhead Permafrost 92-Ib/ft H-40 FMC Gen 6 112' 112' 42 Welded, Insul 20" x 11" 5M 10.7 PP9 Surface DeepCrete DeepCrete over Csg (Pre-Set) 394 bbl LiteCrete designed 10-3/4" 574 sx to provide high 45.5 Ib/ft compressive Int. Yield 5210 psi strength at shoe Collapse 2480 psi and minimal Base Permafrost 1,851' 1,822' Drift - 9.794" fall-back to address surface casing Top of Tail 2,817' 2548' corrosion. 12.5 PP9 LiteCrete 99 bbl Casing Point 3,817' 2,921' 69.41° 13-1/2" 247 sx Intermediate Casin 0' - 7000': 7-5/8" Top of Cement 5138' 3455' 29.7 Ibs/ft DIR/GR/RES L-80, VAM TOP TUZC 5,639' 3,681' Int. Yield 6890 psi NEU/DEN _ Collapse 4790 psi MDT Drift - 6.75" IFR/CASANDRA - Cement Slurry 167 bbl, 815 sx InSite 7000' - 8177': 15.8 ppg Pump Tangent 70.0° -, 7-5/8" 1.17 ft3/sx (6197' • 6647') 29.7 Ibs/ft Top N sand 6,638' 4,051' L-80, BTC-M Int. Yield 6890 psi Collapse 4790 psi Drift - 6.75" Top OA sand 7,171' 4,151' Top OB sand 7,768' 4,216' Test Csg to 84° GR/USIT/CCL 3500 psi Casing Point 8,177' 4,260' 9-7/8" 500' above TUZC -50% of Burst 9/19/2007 MPH-19 Well Plan Schematic.xls Tree:4-1/16"-5M FMC MPH-19 Wellhead: 11" x 4.5" 5M Ge~ w/ 2-7/8" EUE 8rd Tubing H "YY"~P i-}> °- 9 L-- er 4" CIW "H" BPV profile 20" x 34" insulated, 215 #/ft A-53 112` roposed Orig. KB elev. = 70.9' (Doyon 14) rig. GL. elev.= 36.6' Camco 2-7/8" x 1" w/ BK-5 latch 200' MD sidepocket KGB-2 GLM 10 3/4" 45.5# L-80 BTC (Drift ID = 9.794, cap. _ .0961 bpf) 10 3/4" Super Seal II Ftoat Shoe 3817` 2-7/8" 6.5# L-80 EUE 8rd tbg. (Drift ID =2.347, cap. _ .00578 bpf AVA sleeve 1 joint above ESP Window in 7-5/8" csg @ -7171' (estimated Top OA) Well angle @ window = 84° X-nipple at 2000` TVD, 2049' MD Inc. at 10 3/4" shoe 69.4° 70° tangent for pump from -6200 to 6650' MD 84° Max. Inc. in motherbore Centrilift ESP -6650'MD OA Lateral 4 1/2" Slotted Liner 12.6# L-80 IBT w/Swell Packers and blanks 6 3/4" Hole TD @ 10,974' MD Lower Assembly HMC Hanger w/ ZXP Packer and Tubing Tail 7 5/8" 29.7# L-BO Casing 0-7000':VAM TOP 7000-8177': BTC-M ( drift ID = 6.750", cap. = 0.0459 bpf) 8177' DATE REV. BY 08/17/07 PMH COMMENTS Proposed Completion 4-1/2" 12.5# L-80 IBT Tubing Til w/ X-nipple and WLEG MILNE POINT UNIT WELL MPH-19\~--~ BP EXPLORATION ~AK~ - -* C - - .: ~ r ~. - = Y _ ~ C. 'J. - 'T d ~ ~ ~ v F. ~ fl a ~ c' - ¢ ~, ~ - 2 uJ ° n o. .: ~ - a r Z te ' i. ~ . _ _ . ~ ~ ~ ~ a . L .q Q _ i i , ~ . O a=. ~- c , ~. ~ a ~ o ~ ~ a o ~ ~ c H p C F ~ ~ I ~ O Y ~ O - ~ O - .7 =L _ OOO Y00a OO~C V OOOa Orla Or^ PTO O ~ n jp N ~, h-- a 7 - ~ , ^ c = J o Z o ~ ~~ r K ~ ~ ~ . ' - ti 0000000000= 0 0 0 0 0 0 0 0 0 0 0 z ~ Y d '~ ' Q ~ _ Q ONrl x,000 000~D X00 ~ ~ I _ _ __ . d ~ J __ .. _ ~ Z C ~ C ~ ~ i J ¢ 3 o n N v :a ~ .r. -,p -~ ?a Rr+. r r,b Lt1 [L rr. K oo - ~ .. 0 O ~n Y n -_ ~ •, V, nrroxoo v, r- J _-..... ~ _ .. i ~ P~(i ~nV-~b.'J-~ rJ 'r- L ~ P H 2.. - ~ SON-~r"00~p7Ja I _ ? O . I Y 2 ~ ~ rl r M C K J' - --r, ~---rl . __ . v~ V~ h _ _. _~ I . _ '. .. _ - - - I '7 t~ C.-.x^bO .7 0~ Ca O. - _ _. I .. - G .-. 5 o ~ a Poo r'v vin rx 'J aO . O ~ Z ~ ~ i O ~ :il v - _ . r ~,~ .p .p rJ d . n ~ v 1~ -_--------- ~: rYri ~ ~ ,~ - . ~ I __ .O r. .: n .. ~ i _._ _ ._ . .. vi ~ y ~ Z x K ~v n~ ~' z ~~K _ _ ~ _ L r d ~.' ~_ Q a - v i o o 4 -rY °M~ ~~~ ' 1 ~ 0 O ~ - ~ . p ~ n a ao ao o -------_ r, r, i o ? ~ c- - ~ u - ~ c .. - Y p u zv z~~oni jwa~o _ ~ ~ ~' c _ _. _ . . _._ _._ __ _. _ ~ - - ^a?oo oc aoc oo xzz _ _ ,. . _. _. _ __. _ :u = z L .. _ VJ . - . ._ _ _ ^ - s = = ~ ..~~a.r. r, .p v~-~ ~ ~ .. _ .... ^ - ___ _. . .. _ - te > = _ - -rr 00 .p .p rr.~Obrl r- acror'a r~r•,r~xao ooao_o - - - - _ . - ~ r ! `-' r - - - _ Y o -- ~ .. ~ ~ 1 -rl rf,Y V,vrJG -- .. _ _ ~ _ _ - r1 ~ _ ^ _ - _ . _.- .-._ _ -._ _ _ - __- _- _ I - ~ 1! - _ - ._._. _.. 7 !n r! .~ .f ___- --_ _.._ -- ._. .. C _ .-_ _ __ _ rl M :! ~ i C Y _ . ~ 'J * ~ J . _ ~ - . . N . 910 F- ' L _- V _ _ ,^. 7 - '~ ~ 2 v"Z", - c C c c - - o ~ ~ : -- z ~ :..._- _ _.. ._ _ . . ~ o0 _ i Z `v. O~nr O~ ~ __ - F1 . - . ~ m ;; ;; ;; v ~ _---~ m oo r- - >o ,., r., r... .. __ - - o u.t~ __ .. z uvv ~~ 5 Y Y ~ = r 1J 'l1 ~ CU J O ~ O ~ ~~ '. ~ Z ~D _ _ _ _~ L pv'n7~ I J L ~ ~ f .D .D ...~ ~- _ ~ _ .. _.. -__.. . _..-_ _ F r. rl N vl .. ~ ... 1 .__ _ . F'-' b07r~ - - J - i i Q ~ a M Y - rl w7 ~+ J Z C _. ~ _-~ _... _ ~ .,~ ''^ Y ri rr. ~ ~ °~~° t J - ~ .. ? ~ ~ I _ 2~ ¢ ~~~ ~ l~:. .p MM I rJ o . . _ . Z ¢ '~ .^.~ ~ ,~ ] ~ ~ u ~ _ rl ~ ~ ~ . _ . .. ..... _ p y r 0 _ .~. ''~' ..~ i ~ v > v ~ I . Y ~ ~~~t t"r•--rl m ~ ___ y i '~ f. - = y= J 0' J = Z ~ ~L J ~' a ~ ~ o ~ I ` Q` ~ _ r r. Y Y 0 Y 0 Y I Q <<9 NDOZI 4idaa Ic~n~a_ ~ ana l r r _ I 1 I ~ ~ I I 4 I ~ ~ O 'l, Z C . f 1 1 ~ _ _ _ _ - r _ _ _ _ - cacao I ~ ! ~I ~ ~~ ~ ~ ~ _ - - c .4 7 ~ ~ ~ 0 i - _ _ J r -J +~. r _ r .~.~J^ Q F _ I ___.~_ _ _ _ ~ ~ ~ 0 Z K ~x9,- -T i''~z Q ~ ~ ~ -0 COO z L i ~ _ _ -. ~ =-~_-ss-«- I _ __ r~ ~ b Y » » _,~ ~ - f t ~ _~ ~ r "~_'» - ! t~~ s~v ^^ , ~ / ~ ~ - ~ '~ E 3 ~~~~n ~ > ~~. r _ :L y ~ Z - = _ i t O ?v~ ~ Z Y^r - - - - - .. - ~vz,i, ii,i, KY-tY~1 z:x>a>xxaxx _ _ ~~~•F-h, ~ 'r-__ .. .. .cam -_ - Z j L <S<SL c : ~ ~ -r _ ~ ~ ., r Q z X j t.. ~ c L F Y .~ _ "f. - .N 't _ i __ ___._. .v { 1. Y ~ r. r. n.. v . _ ..-- o .~ C ___ _.. .._ .___-._ -_- __ _ - -T. -__._-L-~-. .. .. ... ~ C. ..~ ,. ~ o ..-_..__ ri .~. ~ 'F 2 - - Y _, ^ 0^. ~_ ~ S "Z": .? ? ' :7 o m __ ^`~= ~~ ~ _ .. . a uL~~ .. ~ _ i z ~ _~_ o ? ~ - - _ o Y m ~. f _ ~ Y (M~~ G - ~ ~ /~ T Z .. . N ' _ i i i i ~ i .i ~ O Y r - Y M IUII>lip~o~~i.l-14moS Sperry-Sun BP Planning Report Company: BP Amoco Date: 3/23/2007.. Time: 13:29:46 Pager 2 Field: Milne Point Co-ordinate( NE) Reference: Well: MPH-Diomed, True North Site: M Pt H Pad Vertical (TVD) Reference: 36.6G1+34.30KB 70.9 Well: MPH-Diomede Section (V S) Reference: Wel l (O:OON,000E,1 23.04Azi) Wellpath: Plan MPH-Diomed Survey Calculation Me tbod: Minimum Curvature Db: Oracle` Survey MD Incl Azim TVD Sys TVD VS N/S E/W bLS MapN MapE Toni/Co ft deg .deg ft ft ft ft ft deg/100ft ft fit 7312.26 83.86 130.83 4165.90 4095.00 2443.07 1260.91 3734.18 0.00 6011393.81 560236.59 Start Dirt ., 7332.26 85.56 132.53 4167.75 4096.85 2462.76 1247.67 3749.05 12.00 6011380.68 560251.56 MWD+IFR 7382.26 89.81 136.77 4169.77 4098.87 2511.67 1212.57 3784.57 12.00 6011345.86 560287.35 MWD+IFR 7400.00 89.85 138.90 4169.82 4098.92 2528.82 1199.42 3796.48 12.00 6011332.80 560299.35 MWD+IFR 7500.00 90.07 150.90 4169.89 4098.99 2621.46 1117.76 3853.87 12.00 6011251.58 560357.36 MUVD+IFR 7600.00 90.29 162.90 4169.57 4098.67 2704.34 1025.95 3893.04 12.00 6011160.08 560397.22 MWD+IFR 7700.00 90.50 174.90 4168.88 4097.98 2773.86 928.00 3912.26 12.00 6011062.29 560417.18 MWD+IFR 7763.59 90.62 182.53 4168.25 4097.35 2809.69 864.47 3913.69 12.00 6010998.78 560419.09 End Dir 7800.00 90.62 182.53 4167.85 4096.95 2828.17 828.10 3912.09 0.00 6010962.40 560417.76 MWD+IFR 7900.00 90.62 182.53 4166.77 4095.87 2878.94 728.21 3907.68 0.00 6010862.49 560414.11 MWD+IFR 8000.00 90.62 182.53 4165.68 4094.78 2929.70 628.31 3903.27 0.00 6010762.57 560410.46 MWD+IFR 8100.00 90.62 182.53 4164.59 4093.69 2980.47 528.41 3898.87 0.00 6010662.65 560406.81 MWD+IFR 8200.00 90.62 182.53 4163.50 4092.60 3031.23 428.52 3894.46 0.00 6010562.73 560403.17 MWD+IFR 8300.00 90.62 182.53 4162.41 4091.51 3082.00 328.62 3890.05 0.00 6010462.81 560399.52 MWD+IFR 8400.00 90.62 182.53 4161.32 4090.42 3132.76 228.72 3885.65 0.00 6010362.90 560395.87 MWD+IFR 8500.00 90.62 182.53 4160.23 4089.33 3183.53 128.82 3881.24 0.00 6010262.98 560392.22 MWD+IFR 8600.00 90.62 182.53 4159.14 4088.24 3234.30 28.93 3876.83 0.00 6010163.06 560388.57 MWD+IFR 8700.00 90.62 182.53 4158.05 4087.15 3285.06 -70.97 3872.43 0.00 6010063.14 560384.92 MWD+IFR 8800.00 90.62 182.53 4156.96 4086.06 3335.83 -170.87 3868.02 0.00 6009963.23 560381.27 MWD+IFR 8861.33 90.62 182.53 4156.29 4085.39 3366.96 -232.13 3865.32 0.00 6009901.95 560379.03 Start Dir 8 / 8900.00 90.29 179.45 4155.98 4085.08 3387.48 -270.79 3864.65 8.00 6009863.29 560378.66 MWD+IFR 8933.32 90.00 176.80 4155.90 4085.00 3406.55 -304.09 3865.74 8.00 6009830.00 560380.00 MPH-O6A 8937.06 89.70 176.83 4155.91 4085.01 3408.76 -307.83 3865.95 8.00 6009826.26 560380.24 End Dir 9000.00 89.70 176.83 4156.24 4085.34 3445.94 -370.67 3869.43 0.00 6009763.46 560384.20 MWD+IFR 9100.00 89.70 176.83 4156.76 4085.86 3505.01 -470.51 3874.97 0.00 6009663.67 560390.49 MWD+IFR 9200.00 89.70 176.83 4157.28 4086.38 3564.08 -570.36 3880.51 0.00 6009563.88 560396.78 MWD+IFR 9300.00 89.70 176.83 4157.80 4086.90 3623.16 -670.20 3886.04 0.00 6009464.09 560403.07 MWD+IFR 9400.00 89.70 176.83 4158.32 4087.42 3682.23 -770.05 3891.58 0.00 6009364.30 560409.37 MWD+IFR 9500.00 89.70 176.83 4158.84 4087.94 3741.30 -869.89 3897.11 0.00 6009264.51 560415.66 MWD+IFR 9600.00 89.70 176.83 4159.36 4088.46 3800.38 -969.74 3902.65 0.00 6009164.72 560421.95 MWD+IFR 9700.00 89.70 176.83 4159.88 4088.98 3859.45 -1069.58 3908.19 0.00 6009064.92 560428.24 MWD+IFR 9700.05 89.70 176.83 4159.88 4088.98 3859.48 -1069.63 3908.19 0.00 6009064.87 560428.25 Start Dir 6 / 9800.00 89.78 182.82 4160.34 4089.44 3914.20 -1169.54 3908.50 6.00 6008964.99 560429.31 MWD+IFR 9900.00 89.85 188.82 4160.66 4089.76 3959.91 -1268.97 3898.36 6.00 6008865.48 560419.92 MWD+IFR 10000.00 89.93 194.82 4160.85 4089.95 3996.07 -1366.81 3877.88 6.00 6008767.51 560400.19 MWD+IFR 10086.31 90.00 200.00 4160.90 4090.00 4019.31 -1449.13 3852.06 6.00 6008685.00 560375.00 MPH-06A 10100.00 89.94 200.82 4160.91 4090.01 4022.31 -1461.97 3847.29 6.00 6008672.13 560370.32 MWD+IFR 10200.00 89.47 206.80 4161.43 4090.53 4038.33 -1553.41 3806.93 6.00 6008580.39 560330.67 MWD+IFR 10300.00 89.01 212.78 4162.76 4091.86 4043.99 -1640.15 3757,28 6.00 6008493.29 560281.67 MWD+IFR 10328.30 88.88 214.48 4163.28 4092.38 4043.69 -1663.70 3741.61 6.00 6008469.62 560266.19 End Dir : 1 10400.00 88.88 214.48 4164.68 4093.78 4041.89 -1722.80 3701.03 0.00 6008410.22 560226.06 MWD+IFR 10500.00 88.88 214.48 4166.64 4095.74 4039.37 -1805.22 3644.43 0.00 6008327.38 560170.09 MWD+IFR 10600.00 88.88 214.48 4168.59 4097.69 4036.86 -1887.64 3587.83 0.00 6008244.54 560114.13 MWD+IFR 10700.00 88.88 214.48 4170.55 4099.65 4034.34 -1970.06 3531.23 0.00 6008161.70 560058.16 MWD+IFR 10800.00 88.88 214.48 4172.50 4101.60 4031.83 -2052.48 3474.64 0.00 6008078.87 560002.20 MWD+IFR 10900.00 88.88 214.48 4174.46 4103.56 4029.32 -2134.90 3418.04 0.00 6007996.03 559946.23 MWD+IFR 10973.65 88.88 214.48 4175.90 4105.00 4027.46 -2195.60 3376.36 0.00 6007935.02 559905.01 Total Dept 10973.67 88.88 214.48 4175.90 4105.00 4027.46 -2195.62 3376.34 0.00 6007935.00 559905.00 MPH-06A ent S rev 7 S S rev S 2 S 1 rev \111.1 1)I~:I nll ~ ANTI-('()LLISIUN SL:'i-2'1X(21 t'()nil'n N\' 111 :1 nII .% ~llk1'I~.Y I'k(ItiRnnf M1111. N ~ I. 4V' N1 I ~ 1~1 ~ I 1k I }11.1. ~I, - 6ucgxllJtum Mclhud.ND Inlrrral: '_~ UO I11'A n11..~ II.~I I IA~~II I '7'kn1 I~~~~I 11111-III.~,I II.J-i~ III.' n~IIIIIH~, <[1,:I_.1J .1-1- N 111 ~_"I1~1\l N:1 ~2~111 kJI1~CFf()IIl N1unmum Run~e~ 7717 X11 1201')1 L R~li en. r: 1111]2,(1" I I:m. NII'I I Ufa u.J Kp 1.0 tl 1 h1N IM1I vNw. i. ~ ~: I 1 w n 1 1 Mu111x1: Ir+[ l 111x1. h. nl1 -~I'. 11t. II: ..LAll II11,~111.~~IN(, J-i\21~ nl\\'1111 I<nl~ [R.x wrl:la~: lilllpll.al a'~ \c.~r1 xM.'ax.l: kw~.Ik1.. 160 150 125 100 75 50 ?5 0 27 25 50 75 100 125 150 160 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SOtUin] olour To MD rwlnuv-uNx1w - Z5U I'~r~m N-cl¢:In1: I'Lru MI•I I-ILunmrl I'HI - 500 11,.xlnlo: 73u~fi 750 kcl ILNw1~a in ~lJCil-~u3nRll 7u ~wu 1000 - (S()() ~ ..a1~1n lNr~m un>.im uanm>; \n1'k N.4 ~I~.-N' I-nxn lb'l) - ZUUU I_::N ri 1X1 ~1 Un :J i~~ - zsoo - ~ooo - 3soo - 4000 Irarwl - 4500 ,.,i< niiii c niiii ~cl° +i . .% - -l - ,: : , . - 5Q()U ~ nll'Il-ui1Ml'I1-1111-AIeH'r kuk -• hll'll!I[ 1Af 1'11-11[1- of+1'v klak - 55(]U --- MI'Ila lt~fMl'I l-Una nI:U'1r I<1+k ~)(]U(~ MI'l l-Ux 1n11'I l-Uxn AlAi:il'Hkuk MI'Il-U%IMI'I I-11x:11'1111, n1nj11r kuk - hll'll-UN lnll'I l-UNIi1. Mxl'~I'kuk nu'I Lnx cnl rl l.oxlnl 1. nwl..r l<~t, MITI-11%rMl'l l-n%111'1111. Ma1'x liixk hll'll-I.'.1n11'I1-121. n1.1 %1r kl.k MITI-lilnll'11-131. nI4nx l'_UU MI'll~li fMl'I l-lint. Mllxx~l'21X1 nil'II-IJ InII'I l-IJI. AI:11'x klak h1I'Il-1tl.nnc1i 11'Iml nll'Il-I)enn.•d 1'1x1 1. Ntll:kkl)k.~ I'I~n nll'll-I"11`Inn h11'11-171. hlepx kuk nll'%-t[1M1'%-i[1. Mxluf klek I'1a11 n11'11-11x~1naJ hil'I l-Ih.nn.J N'~ J U ~~ Removed. ;an for Plans le (c~ No Errors %I:x'Ik)N I)I-..1.111 x. \ii I\II N-~ -I-.-N 111 .t 11:1.. \'~,v 1.1r..1 Nr. Illi xi JI1~<~X1 I_'rn~41 37X.1% U.In1 I~ UI1 '_X;11' 112.~i JIM17.7[ I2J7.n7 17JVJ1< 12.W J<IX1 2Jfi2.]fi XI 1,3077 JInv.77 1_'I?.c7 17W57 12.W JS 1x1 2<II,G7 1,2 I%2.~i JI<4t.2< X(W J7 x41,i.fiv 12.1111 YA4.k1 2XU4,fi1 fit Ix:.--<3 JI~r~.24 -?22.12 llt4c-i2 111X1 111X/ 3111(.4h IXI lilvHfl JI[['MI -i11J.n4 ikl.[.7J N.IX1 !X..211 iJIH~.« nll'll-INV\72rcv2 TI 17n,xi JI«vl -N17,Ni ixfi 4[ NIIU I7J 44 iJll%, 71~ 711 Illy%i JI~Y.MN -IIN~4.ni lW)%.IY U.IXI 11.1111 i%~v.ix ............. ....IXI 21x11X1 111XI.'NI -1X4.1{ J%c21N1 (1.1X1 %4.111 JIII4.11 MI'I l-Illrn lirei' I IU IIA{2K iU %%XX 21J.J% JI(.i.2% -IM~i.7U i7JI.Ll G-Uxl 4J.J7 11W i.fiU II lU'173 M17 %%.K% 21J.JX Jll['X1 _21'n,fi2 3376.tJ 11.1x1 IIJNI Ju27.Jfi nil'I I-UnA Urea I • Sperry-Sun A~ticollision Report Company: BP Amoco Date:. 3/23/2007 .Time: 13:25:28 Page: 1 Field: Milne Point Reference Site: M PtH Pad Co-ordinate(NE) Reference: Well: MPH-Diomed, True North Reference Well: MPH-Diomed Vertical (TVD) Reference:. 36.6GL+34.30KB 70 .9 Reference Wellpatli?Jan MPH-Diomed Db: .Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Principal Plan & PLANNED PROGRAM Interpolation Metho~vlD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 7312.26 to 10973.6 7 ft Scan Method: Trav Cylinder North Maximum Radius:l293.94 ft Error Surface : Ellipse + Casing Survey Program for Definitive Wellpath Date: 3/23/2007 Validated: No Version: 2 Planned From To Survey Toolcode Tool N ame ft ft 34.30 1200.00 Planned: MPH-Diomed Pb1 Wp 7.0 V26 (0) CB-GYRO-SS Camera based gyro single shots 1200.00 7312.26 Planned: MPH-D iomed Pb1 Wp 7.0 V26 (0) MWD+IFR+MS MWD +IFR + Multi Station 7312.26 10940.21 Planned: MPH-D iomed Wp 4.0 V26 MWD+IFR+MS MWD +IFR + Multi Station 7228.57 10973.67 Planned: MPH-D iomed Wp 4.0 V26 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 10973.67 4175.90 5.500 6.250 4 1 /2" Summary <---------------------- Offset Wellpath ----------------------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft M Pt G Pad MPG-09 MPG-09 V2 7599.74 6525.00 581.90 197.99 383.91 Pass: Major Risk M Pt H Pad MPH-02 MPH-02 V1 10129.95 6050.00 290.53 126.35 164.17 Pass: Major Risk M Pt H Pad MPH-03 MPH-03 V1 8249.70 5630.00 938.93 108.76 830.17 Pass: Major Risk M Pt H Pad MPH-OS MPH-05 V1 10973.34 6175.00 271.92 83.86 188.06 Pass: Major Risk M Pt H Pad MPH-06 MPH-06 V1 Out of range M Pt H Pad MPH-08 MPH-08 V3 10838.91 5825.00 1166.29 80.33 1085.96 Pass: Major Risk M Pt H Pad MPH-08 MPH-08A V4 10838.91 5825.00 1166.29 80.26 1086.02 Pass: Major Risk M Pt H Pad MPH-O8 MPH-08APB1 V3 10838.91 5825.00 1166.29 80.26 1086.02 Pass: Major Risk M Pt H Pad MPH-O8 MPH-OSB V5 10838.91 5825.00 1166.29 80.26 1086.02 Pass: Major Risk M Pt H Pad MPH-08 MPH-O86L1 V16 10838.91 5825.00 1166.29 80.26 1086.02 Pass: Major Risk M Pt H Pad MPH-O8 MPH-08BP61 V1 10838.91 5825.00 1166.29 80.26 1086.02 Pass: Major Risk M Pt H Pad MPH-12 MPH-12 V2 9928.77 6175.00 883.54 107.36 776.18 Pass: Major Risk M Pt H Pad MPH-13 MPH-13 V4 9897.28 6375.00 120.48 28.89 91.58 Pass: Minor 1/200 M Pt H Pad MPH-13 MPH-13A V4 7354.93 6875.00 132.81 17.41 115.40 Pass: Minor 1/200 M Pt H Pad MPH-14 MPH-14 V7 8741.68 6000.00 512.85 100.43 412.42 Pass: Major Risk M Pt H Pad MPH-Diomed Plan MPH-Diomed P61 V2 7325.00 7325.00 0.14 0.55 -0.41 FAIL: NOERRORS M Pt H Pad Plan MPH-17 Plan MPH-17 V4 Pl an: M Out of range M Pt S Pad MPS-35 MPS-35 V17 Out of range Site: M Pt G Pad Well: MPG-09 Rule As signed: Major Risk Wellpath: MPG-09 V2 Inter-Si te Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset. TFO+AZI TFO-IiS Casing/IlBistanceArea Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 7335.78 4168.01 6100.00 3563.00 15.05 65.20 113.04 340.21 621.44 143.06 478.38 Pass 7383.86 4169.77 6125.00 3571.32 14.39 65.12 116.37 339.40 616.04 147.06 468.98 Pass 7399.74 4169.82 6150.00 3579.70 14.03 65.17 117.47 338.60 610.39 149.85 460.54 Pass 7415.34 4169.86 6175.00 3588.13 13.67 65.15 118.48 337.74 605.03 152.80 452.23 Pass 7430.66 4169.89 6200.00 3596.62 13.32 65.06 119.38 336.80 599.96 155.86 444.10 Pass 7445.66 4169.90 6225.00 3605.17 12.99 64.91 120.18 335.80 595.23 159.04 436.19 Pass 7460.32 4169.91 6250.00 3613.76 12.68 64.70 120.86 334.73 590.92 162.36 428.57 Pass 7474.61 4169.91 6275.00 3622.39 12.37 64.44 121.42 333.57 587.07 165.77 421.30 Pass 7488.51 4169.91 6300.00 3631.07 12.09 64.14 121.87 332.35 583.72 169.30 414.42 Pass 7502.06 4169.89 6325.00 3639.74 11.82 63.79 122.20 331.06 580.90 172.86 408.04 Pass 7515.31 4169.87 6350.00 3648.24 11.58 63.40 122.46 329.73 578.75 176.40 402.35 Pass 7528.28 4169.84 6375.00 3656.55 11.35 62.97 122.66 328.36 577.28 179.83 397.44 Pass 7540.97 4169.81 6400.00 3664.68 11.14 62.51 122.78 326.97 576.51 183.18 393.33 Pass 7553.36 4169.77 6425.00 3672.69 10.94 62.02 122.85 325.55 576.40 186.41 389.99 Pass S err -Sun P Y BP Planning Report Companyc BP Amoco Date: 3/23/2007 Time: 13:29:46 Page: 1 Field:- Milne Point Co-ordinate(NE) Reference: WeIL MPH-Diomed, True North Site:. M Pt H Pad Vertical (TVD) References:. 36.6GL+34.30K6 70.9 Well: MPH-Diomed Section (VS) References Well{l):OON,O:OOE,123:04AZ) Weupath: Plan MPH-Diomed Survey Calculation Method: Minimum Curvature Dbs Oracle Plan: MPH-Diomed Wp 4.0 Date Composed: 3/21/2007 Version: 26 Principal: Yes Tied-to: From: Definitive Path Field: Milne Point North Slope UNITED STATES Map SysteniJS State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo DatumiVAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum:Mean Sea Level Geomagnetic Model: bggm2006 Site: M Pt H Pad TR-13-10 UNITED STATES :North Slope Site Position: Northing: 6008971.91 ft Latitude: 70 26 6.665 N From: Map Easting: 555404.91 ft Longitude: 149 32 53.895 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.43 deg Well: MPH-Diomed Slot Name: Grass roots plan for MPH-06 ST. Well Position: +N/-S 1124.70 ft Northing: 6010104.76 ft Latitude: 70 26 17.726 N +E/-W 1116.02 ft Easting : 556512.44 ft Longitude: 149 32 21.139 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Role Size Name ft ft in in 10973.67 4175.90 5.500 6.250 4 1 /2" Formations MD TVD Formations Lithology Dip Angle Dip Direction Targets Map MaP <---- .Latitude ----> <--- .Longitude' --- Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec "Deg Min Ser Dip. Dir. ft ft ft ft ft MPH-06A T2 rev 2 4155.90 -304.09 3865.74 6009830.00 560380.00 70 26 14.725 N 149 30 27.682 W MPH-06A T3 rev 1 4160.90 -1449.13 3852.06 6008685.00 560375.00 70 26 3.464 N 149 30 28.100 W MPH-06A T1 Rev 1 4165.90 1282.27 3712.74 6011415.00 560215.00 70 26 30.327 N 149 30 32.149 W MPH-06A T2 rev 1 4165.90 -304.09 3865.74 6009830.00 560380.00 70 26 14.725 N 149 30 27.682 W MPH-06A T4 rev 1 4175.90 -2195.62 3376.34 6007935.00 559905.00 70 25 56.125 N 149 30 42.070 W Plan Section Information MD Incl. Azim TVD +N/-S +E/-W DLS Build Turn TFO Target. ft deg deg ft ft ft deg/100ftdeg/1OOftdeg/1OOft deg. 7312.26 83.86 130.83 4165.90 1260.91 3734.18 0.00 0.00 0.00 0.00 7332.26 85.56 132.53 4167.75 1247.67 3749.05 12.00 8.50 8.51 45.00 7382.26 89.81 136.77 4169.77 1212.57 3784.57 12.00 8.50 8.48 45.00 7763.59 90.62 182.53 4168.25 864.47 3913.69 12.00 0.21 12.00 88.94 8861.33 90.62 182.53 4156.29 -232.13 3865.32 0.00 0.00 0.00 0.00 8933.32 90.00 176.80 4155.90 -304.09 3865.74 8.00 -0.87 -7.95 -96.20 MPH-06A T2 rev 2 8937.06 89.70 176.83 4155.91 -307.83 3865.95 8.00 -7.97 0.70 174.99 9700.05 89.70 176.83 4159.88 -1069.63 3908.19 0.00 0.00 0.00 0.00 10086.31 90.00 200.00 4160.90 -1449.13 3852.06 6.00 0.08 6.00 89.30 MPH-06A T3 rev 1 10328.30 88.88 214.48 4163.28 -1663.70 3741.61 6.00 -0.46 5.98 94.47 10973.67 88.88 214.48 4175.90 -2195.62 3376.34 0.00 0.00 0.00 0.00 MPH-06A T4 rev 1 ~' • r by October 1st, 2007 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7`" Avenue, Suite 100 Anchorage, AK 99501 Re: Request for Permit to Drill and Complete MPH-19 and MPH-19L 1. Mr. Maunder: Doyon 14 is presently scheduled to spud MPH-19 on November 1±. As is detailed in this permit application package, the plan is to drill 13-1/2" surface to 3817' MD/2920' TVD and set 10-3/4" 45.5#, drill 9-7/8" hole to 8177' MD with ~ 180' of rathole below the base of the Schrader Bluff OB Sand and set 7-5/8" 29.7#. Prior to running the 7-5/8"casing we will conduct pressure sampling operations over the Schrader Bluff interval. This will be the main or "mother" wellbore MPH-19. After running the 7-5/8" casing and cementing to above the TUZC, we will run a USIT to confirm good cement and set a packer and seal-bore assembly below the OA sand interval to allow future CTD access to the OB Sands. After setting a whipstock and milling a window in the 7-5/8" casing we will drill approximately 3700' of 6-3/4" OA lateral -depending on sand quality. This will be MPH-I9L1. A combination of 4-/12" slotted and blank liner and possible swell packers will be run on a hook-wall hanger into the lateral, and the well will be completed with 2-7/8" tubing and an ESP. The attached information package details our plans. If I can provide any additional information, please contact me C 564-4195 Sincerely, Paul Hanso Drilling Engineer BPXA /ACT Alaska Department of Natural Resources Land Administration System ?~~:i~ r,~c,l,ci~ _. ~.a~~ch State Cabins Page 1 of 3 atura s _._.__. File Type A~~ File Number: 25906 ~ Printable Case File Summary 1_AS ler~~r ~ Gase Abstract I Gase Detai! I Land Abstract Fz1e: ADL25906 - ~ - S<.arch for utatu~ ;J;ar Updates As ~~I~ 10' I I -2007 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL AT"[~N: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Cure Tyhe: ~~~ OLL 8r. GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Locution: DOG D1V OIL AND GAS Ouse Slcrtus: 35 ISS/APPRV/ACTV/ AUT{ I Status L)crte: 02/19/1965 Total Acr°es: 2560.000 Date Inatrutecl: 11 /02/ 1964 Office of Primar~y~ Kes~~orrsibilit}~: DOG DiV OIL AND GAS La.~t Ti~crn,cactiofr Ihrte: 10/23;200 Case Strbtyhe : i~ NORTH SLOPE Last Tr•arrsactiorr: AA-NRB ASSIGNMENT APPROVED ILIerlChan: ~) TO1177S117~7: ~13N RCIYlgB: OI~L~ ~~'~~/1rii1.' 27 SeC~lOnACI"es: 640 `u~PC;'! ~I~tS Meridian: U T;nrr~~l~i~~: 013N Range: UIUI~. •S'~~Irorz~ 28 ~~cirr~i; ~1~j~r~,. ~;-~(~ ~1leridian: U 7~nrnshr~>. 013N Rarzge: O I lll; ti'ec~i~,rr,~ 33 ~~c~~~irur .I~~rc~.~ t,lO .lferidiun: U 1 ~nrns{iiE~: 013N Rurtge: 010E ti~e~~liu~7.~ ~ 1 S~~~crru%t Icr'es': 640 .Legal Descriptic-u ll -0?-19<-1 * * *.S9LE NOTICE LEGAL DESCRIPTION* U-3-1-1-1.-~LL SEC'ZION?..-", 7'13.~`,KIOE, t-";tt 6-I0 ALL SL:C'T/O:'~' ~R " " " 6-10 ALL SEC"TIO_N 33, " " " «0 ALL SECTION 3~1, " " "640 CONT. I L'~'LVG 2 ~ <O ~ ORES, MORE CSR LESS. http://www.dnr. state.ak.us/las/Gase_Summary.cfm?FileType=ADL&FileNumber=25906... 10/11 /2007 Alaska Department of Natural Resources Land Administration System Page 2 of 3 • 11-0~-1988***UNITILGD *~* 'I:I3N., R.IOE.. U.1~I SECTIO,V ?i':.~ILL 6-10 SECTION 28': ALL 6-l0 SECTION 33: ALL 6.10 SECTION 3.1: ALL 6-10 CONT 4IN111'G 2560 ACRES, MORE OR LESS. #*#*~~~~k=k~~~=k***. *~~#~k:;:*~*~,~:k#rxxxx~kX*~k#*#=k~k*~~*~#*,.k;k >•,c ;t ~e :kx*~kt-k*#=k:k#~T;t ~kx 7-30-91 '~ ~ "PARTIC'IP~I T/NG ~12EA ~EGAI. DESCRIPTION* SC'KR~ 1 DER 13L UFF P 1 ,SA;lIE LS'lHE C.'~%/T /.I~;(~AL /)ESCRIPT/O,~' ~iBOG'I', D:9 TED 11-?-~4~ti' 11-1-y6 ~~TI',~RTICII'ATIrV(;:~READE.S'C'RIPI'IO.V *"k KUI'.-~R~h P,IRTICIPATING.9REA TR.1C'T 1-1 T 13 N.. R. 10 E.. U 1LI. ,S'EC'. ?": t'1%2NiT'li-l. ,l'ti~'1;'~,S'i'1'-/: .S'EC'. 28 VI/2 NI/251~1/l, ~"1!2SE1%-~; CONT..4ININU~IPPROXI~If<1TELY600.00 %~C'RES, MORE OR I,E~S'S. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25906... 10/ 11 /2007 TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ ,~~I PTD# ©?Ds7f~~d Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing / well ~i~Qa~~®?..3.~~I~ ~/~J~'~1 ~9 , t/ its in di If l t t g ( as wo permit No~O ~ API No. 50~~~3~1 ~ API number are production should continue to be reported as a function of the between 60-69) original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_~ from records, data and logs acquired for welt SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. , assumes the Liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and l0' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after ~ om~anx Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. SCompanx Nnme) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 7/13/2007 ~ i o~ N ,: ~ ~ ~ ~ ~ ~ ~„ , m o ~ , ~ N ~ N ~ ~ ~ ~ , , , ~ Q ,. ~ ; ~' CI O~ ; ~ 3 ; ~ ~ ~ ~ ; ; ~, ; a ~ ° L o a ` mf aT c O a. N, a ~ N, ~ , N o M' ~ ~ ~ ' : E O ~ ' ~ ~ ~ N ~ ~ ~ ~ ~ fl: ~ N ~ O ~ ~ ~ L n o. n ~: ~ . , ; ; ; I N ~, ~, ~ N ( ~ 3 rn ~ c, O Q 2. c. ° _ N , , , w , a. ~, . a, m, ~: a. 2' '~ ; ; ; Q ' ~ p ~ N, a ~ v a fps ~ O fd~ ~ a ,, ~, ~ ~, ~y ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ Z' •4 ~ Q , ~ a N. a ~ j N. W m -O O N N N p' N 2 o ~' ~ 2' c' ~, Q = ' ~ ; ; ; ~ v a' ~ ~ a ~ a N ' ~ ~ °. ~~ ~ ~° ~ m' m' a M' rn, o. d a o. Z rn ~ ~ ~ ~ ~ ~, ~ ~ 2. a c' a~' ~N' o ~ ar a' °, ~ ~ ~ a. J 00 ~ ~ ~ ~ ~ ~ O, ~ ~ d~ N, ._~ N~ ~~ N~ N~ ~ g ~ ~ N ~ ~ ~ ~~ ~ ~ ~ 'N f0' U• ~ d e r ~ ; ~~ ~~ ~~ ~; ~~ ~~ ; ; ~ X' m N. QY ~~ ~~ ~~ 3 ~ _~ o ~ ~ ~~ ~~ ~~ N ~~ ~ r C i o ; ; i ; Q ~' N~ N, N~ N N, N, N N } } } ' N~ N ' N~ N~ N N ' N, N, N N ' ' N, N ' N~ N, N N ~ Q Q ' ' Q Q, ' Q, ~, Q, Q, O, Q, N Q ' ' N N~ N Q, N N, ' ' N~ N, N: N N N ' ' ' O Q ' ' N~ N, g , Q Q, ' N~ N, . ; r } }; } } } } } } z z Z Z, I Z Z Z Z z } z } Z } } } } ~ z z } L L Z z } ~ T , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U N ~ C O' , •~ ; ; ; ; E; ; 3, ; : , - , E. ~, o ~ ~ , ~ ~ Z , ik ; a~ N ; ; v i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ .Q N N ; ; ; ~- c L. ; ; ; a a E ~ 3; ~, 3. ° a ~ E' L' ` N' U ~ ~ 7, N: ~ ~ ~ N N, a : N C N N' f6 C ~; N ~ ~. cn rn c, 3, : ~~ o. •` 3 0 ~ ; ~ a o i ~ ~; ~ ~ .N; n ; ~ ~ ; o . ' .4 ~ N fl. ~ o : ~ O. a_: ~ ~; w N Z Z L ~ ~ ~ w ~ 3 m: u ; ~; ; otS ; ~ 7 ; ° ~ _ ~ ~ _ -a o, c. -o. °, ~ •c. -o °: a~, o. ° ~' ~ c. o m; °, o, ~ ~ ' N w 4 c ~. ~ o: o` a ~ ~- Q ~ ~ ~, ~. ' -, a, a C C E' ~ (6, ~~ _ ° M~ ~ O~ C ~~ >~ ~~ ~ "C. ~ N~ ~~ ~ . ~' ~' C N +L~' p1 ~' o N .c O: ~ C w Y o o ~ ; -o; ~, ~ ~ ~ c: Q I O o ° of +. ~ ~j 'o. ~, ~ °. ~ ci o. ' ~ ~ d ° ~ , .a •3, I o > ~, N ~` •~ •,°-~ J ~ ~ ~~ O~ N' ~, .C~ C, O ~ 7 ~ a~ f6' ~~ i Y ~ ~, 0' ~ N• O, ~, O' N N. ~~ Q. N. ~~ h, a, O. 03 p. ~, N N ~ Q :?, ~; °- ~ ~; ~ io: ~ ~; ~; ° . a ~; ~ ~; N, m ~ ~: 4 ~ , ° ~ %, ~ ~ ~ 4 N a a 3, ~ o `-° ~ o 3, ' ~ t0. C~ a. t6. O. 4 , . c -O p, ~ a. ~~ i a• N, ~ ' ' a i C N. M ' ~' , O, N. L ~~ ' , ~ N• O ~ ' C ' , >7 ' ' m ° ° z O ~ y, a a N, a ~, a fl 3; 3; a~ a~, ~; ~ N w . ~ o 3 v' a a~ ~ °. N a y ~ a '. N of ; ~ ~ o ~ , o w U O a ~ a; ' o. c: ~ m a~ o ' >: m o' a>, , o a, a~ a: a~ ~ m' ~' ° o, ~ o o, ~ o o Y m ~ a ~ m o ~ w c a o a ~ '~ ~' o : m; a' ~ ~ ~ ~ ~ , °, °: a c, ~ ~ ~, o n ~ ~ . a o ~~ -a m' rn o' • .~ uT ~ c ° N ° °~ • ~ v. ~ E ~ o o ~ ~ 3' ~, q ~; ~, ~ ~, ~; '~; N; m a N ca m f6' ~ m' o ~' ~ T ' ' c v. 3, °' Z, -° ~; °' ' ~' o: • ~. ° O r° ~ ~; ~; °. a ~, ~° ar o, m 3 S ~° ~ ° ~, of ° ~ ~ ~ c. Y ui ' .3 ° ~ ° ' ' m- ~ ` ,~ o. ' ~ a a • N > ~~ ~ LL ~ d m~ n. _, -° a~ a~ cr •`~, T c, ~; n. ~, .a -°~ ~, ~ ~ ~ ;~~ ~ a i: a i N r; >, m c ~ O .N 0 • ~ ai d ° ~' N, a N: ~ ~ U, ° U O, ~~ ; c. „ ~ N C' ~~ E~ N' ~, «, N' N, O. L, C. C, ~~ U, C a a o .. .. °~~ O ~ - N C ~ m~ v' c f"' LL1 ~~ ~~ 3, ~o, m, c ~ U io~ U ~~ c' `o' `o' ~~ p ~ ~' E m. v ui a' > °~ o _ °3. •-~ -, a' a?, °~ ~: w' ~ -_, a E' c, v m o, N a~' ~ ~ {\ Cn ~ ~; ~, °• -°• -°~ •> 'co ~; ~~ a °' a~, ~ ~~ ~~ ' '~ y ~~ 3` c ~ ; ~, ~: ~ w~ w~ ~ g, ~~ ~~ Q . ~ ~~ ~: _ Y m •c ~' ~' f6 ~' i, ~' a a ~' ~' ' 3. a ~ o; o; 3 ~ ~ ~ ~ c c ~ ~ ~; a i a ~ ~ ~,~, ~' w m, a OO' a' p ~ V ~ ~'Q, a Z' ; ~' ~ ~ ~ ~ ~ ~~ " O; o; -° " o' O, ~ a ~' a ~ ~'~' ~, ~ o .~ ~ o; Q ` '_' U , _ , , ~ , ; 'a _ Q, _ m m ~ a, ; ~,~; U - w n D _ ~ O N M V ~fY (p f~ _ a0 m O N M V ~ M r O m O N M V' M O B W O~ ° r N __ M cr ~ (D 1~ O O ___ _ r N N N N N N N N N N M M M M M M M M M M U F- O 0 C C O C N «' ~ N O O ~'' N ~ y N N V O w M C y Q ~ O ~ C ~ ~ O M O y ' d ~ L N • O ~ O p ~ / ~ N ~ ~ E ~ U ~ a ¢ a a w aW _V ~ ~ as • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well PerTnitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infom~ation, information of this nature is accumulated ai 1he end of the file under APPENDIX. No special efforl has been made to chronologically organize this calegory of information. mph-1911.tapx Sperry-Sun Drilling9 Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ wed Mar 12 15:06:45 2008 Reel Header Service name .............LISTPE Date . ...................08/03/12 Ori in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS writing Library. Tape Header Service name .............LISTPE Date . ...................08/03/12 Origin ...................STS Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Physical EOF comment Record TAPE HEADER Milne Point MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: MWD RUN 1 w-0005355566 A. MUNRO JERRY MWD RUN 4 w-0005355566 C.CREGLOW G. BURLEY scientific Technical Services Library. scientific Technical services MPH-19L1 50029233716000 BP Exploration Alaska Sperry Drilling Services 12-MAR-08 MWD RUN 2 w-0005355566 D. RICHARDSO J. HABERTHUR MWD RUN 5 w-0005355566 C. CREGLOW G. BURLEY 34 13N l0e 2954 4132 Page 1 MWD RUN 3 w-0005355566 CHRIS CREGLO G. BURLEY MAD RUN 5 w-0005355566 C. CREGLOW G. BURLEY ~O~- 13~ ~l ~D 5 ~- mph-1911.tapx ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: 70.00 GROUND LEVEL: 35.90 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.500 20.000 112.0 2ND STRING 9.875 10.750 3814.0 3RD STRING 6.750 9.625 6885.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE EXITS MPH-19 AT 6871'MD/4151'TVD VIA A WHIPSTOCK. THE WHIP- STOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND A BIT OF RAT HOLE WAS DRILLED DURING MWD RUN 3. ONLY SROP DATA ARE PRESENTED FOR THIS RUN. 4. MWD RUNS 1,2,4,5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 2,4,5 ALSO INCLUDED COMPENSATED THERMAL NEUTRON (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND PRESSURE WHILE DRILLING (PWD). MWD RUNS 4,5 ALSO INLCUDED AT-BIT INCLINATION (ABI). MAD DATA ACQUIRED WHILE POOH AFTER REACHING FINAL TD ARE PRESENTED SEPARATELY. 5. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED HOLE GAMMA RAY LOG RUN ON 10 DECEMBER 2007. THESE DIGITAL DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 9 JANUARY 2008, PER DENNIS URBAN (BP). LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 6. MWD RUNS 1-5 REPRESENT WELL MPH-19 L1 WITH API#: 50-029-23371-60-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10780'MD/4190'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). Page 2 mph-1911.tapx SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR-TO-BIT DISTANCE. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. PARAMETERS UTILIZED FOR POROSITY LOG PROCESSING: HOLE SIZE: 9.875" BIT MUD WEIGHT: 8.8-9.6 PPG MUD SALINITY: 200-600 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPS 224.5 10727.0 FET 224.5 10727.0 RPD 224.5 10727.0 RPX 224.5 10727.0 RPM 224.5 10727.0 GR 232.5 10720.5 ROP 299.5 10787.5 FONT 3806.5 10692.0 NCNT 3806.5 10692.0 RHOB 3806.5 10707.0 NPHI 3806.5 10692.0 PEF 3806.5 10707.0 DRHO 3806.5 10707.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- Page 3 mph-1911.tapx BASELINE DEPTH GR 232.5 230.5 235.0 233.0 240.5 239.0 253.5 251.5 255.5 254.0 287.0 283.5 323.5 321.0 330.0 329.0 449.5 448.0 470.0 467.5 526.0 525.5 587.0 585.5 602.0 600.5 615.5 613.5 629.0 629.0 655.5 655.0 668.5 667.0 693.0 691.5 713.5 712.0 771.0 771.5 794.5 792.5 886.0 884.5 891.0 889.0 896.5 895.0 913.5 913.5 961.5 961.0 978.5 977.0 1048.0 1047.5 1089.5 1090.0 1116.0 1115.0 1122.5 1121.0 1134.5 1131.0 1195.0 1194.0 1198.0 1197.5 1272.5 1272.0 1287.0 1285.5 1435.5 1434.0 1592.0 1592.5 1770.5 1769.0 1795.5 1793.5 1814.5 1813.5 1824.0 1824.0 1839.0 1838.5 1877.5 1876.5 1914.5 1913.5 1916.5 1915.5 2038.5 2037.0 2063.5 2063.0 2112.0 2111.5 2141.0 2138.5 2186.5 2184.0 2267.5 2266.0 2498.0 2497.0 2659.5 2659.0 2682.5 2682.5 2706.0 2706.0 2726.0 2724.5 2746.0 2744.0 2751.5 2749.0 2952.0 2951.5 2956.5 2956.0 2988.5 2988.0 Page 4 mph-1911.tapx 3025.5 3026.0 3063.0 3062.5 3090.0 3092.5 3096.5 3097.0 3140.0 3138.0 3146.5 3142.5 3312.5 3311.5 3330.5 3329.5 3369.5 3366.5 3456.5 3453.5 3555.5 3554.0 3603.0 3604.0 3623.5 3624.5 3699.0 3698.0 3777.0 3774.0 3790.5 3785.0 3815.0 3808.0 3831.0 3825.0 3869.0 3864.0 3891.5 3886.0 3907.5 3901.5 3921.0 3914.5 3938.5 3933.0 3967.5 3960.5 3974.5 3966.0 3986.5 3980.0 3994.0 3987.0 4012.5 4006.0 4066.5 4058.0 4098.0 4091.5 4133.0 4126.5 4156.5 4149.0 4161.5 4153.0 4173.5 4166.5 4292.0 4288.0 4305.5 4300.5 4316.0 4312.0 4332.5 4329.5 4373.5 4371.0 4378.5 4375.0 4419.0 4415.5 4432.5 4428.5 4446.0 4441.5 4448.0 4443.5 4452.0 4447.0 4454.0 4450.0 4472.0 4467.0 4478.5 4473.5 4491.5 4486.5 4536.0 4531.5 4601.0 4596.0 4631.5 4626.5 4648.0 4641.5 4697.0 4690.5 4729.5 4724.5 4750.5 4744.0 4771.0 4765.5 4777.5 4772.0 4803.0 4798.0 4826.5 4823.0 4838.0 4833.5 4845.5 4840.5 4870.5 4865.5 Page 5 mph-1911.tapx 4890.5 4884.5 4923.5 4916.0 4948.0 4943.5 4960.5 4955.0 4970.5 4962.5 4985.5 4978.5 4990.5 4985.5 5020.0 5011.5 5046.5 5040.0 5060.5 5055.0 5071.5 5066.0 5088.0 5085.0 5091.0 5087.0 5101.5 5097.5 5123.5 5118.5 5137.5 5132.0 5145.0 5140.0 5150.0 5145.0 5151.5 5146.0 5296.5 5290.5 5321.5 5315.5 5349.0 5344.0 5353.5 5349.0 5361.5 5357.0 5369.5 5363.0 5385.5 5380.0 5417.5 5411.0 5420.5 5414.5 5422.0 5416.0 5425.5 5417.5 5432.5 5425.5 5438.5 5432.5 5456.5 5448.5 5484.0 5477.0 5492.5 5487.5 5513.5 5507.0 5521.5 5515.0 5524.5 5519.5 5535.0 5529.5 5546.0 5540.5 5551.5 5546.0 5562.5 5554.5 5566.0 5560.0 5568.5 5562.0 5572.0 5565.5 5574.5 5568.5 5582.0 5576.0 5589.5 5585.0 5602.5 5596.5 5608.0 5602.0 5611.0 5606.0 5618.5 5613.5 5627.0. 5623.5 5641.5 5637.0 5668.0 5665.0 5686.0 5681.5 5803.0 5795.5 5812.5 5806.5 5821.5 5818.5 5826.5 5821.5 5838.5 5834.0 5884.0 5877.5 5892.0 5885.5 Page 6 • 5901.0 5935.0 5954.0 5977.0 6057.0 6086.0 6153.5 6161.5 6194.5 6201.5 6210.0 6223.0 6270.0 6278.0 6329.5 6336.5 6379.0 6402.5 6427.5 6438.0 6450.5 6482.5 6493.5 6499.0 6520.0 6525.5 6533.5 6546.5 6557.0 6575.5 6587.0 6590.0 6616.0 6618.0 6620.5 6631.5 6643.0 6650.5 6667.5 6669.5 6702.5 6713.0 6716.5 6721.0 6734.0 6746.5 6753.5 6757.5 6766.5 6840.5 6859.0 6870.0 6876.5 10787.5 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD 5896.0 5929.0 5947.0 5970.0 6051.5 6080.5 6148.0 6155.5 6188.5 6196.5 6206.5 6221.0 6267.0 6272.5 6323.0 6330.5 6373.0 6397.5 6421.5 6432.0 6446.0 6477.0 6489.0 6492.5 6512.5 6517.5 6526.0 6539.5 6549.5 6569.0 6579.0 6582.5 6608.5 6610.5 6612.0 6625.0 6636.0 6642.0 6661.0 6663.0 6694.5 6703.0 6706.0 6713.5 6724.0 6738.0 6744.5 6748.5 6758.0 6832.5 6850.0 6862.5 6869.0 10780.0 mph-1911.tapx BIT RUN NO MERGE TOP MERGE BASE 1 222.5 3825.0 2 3825.0 6871.0 3 6871.5 6903.0 4 6903.0 8086.5 5 8086.5 10780.0 Page 7 ~ ~ .mph-1911.tapx REMARKS: MERGED MAIN PASS. Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 RHOB MWD G/CC 4 1 68 12 4 DRHO MWD G/CC 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD B/E 4 1 68 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 224.5 10787.5 5506 21127 224.5 10787.5 FCNT MwD CP30 74.3 5211.73 630.64 13754 3806.5 10692 NCNT MwD CP30 12084.3 354114 107156 13754 3806.5 10692 RHOB MwD G/CC 0.613 3.021 2.1429 13799 3806.5 10707 DRHO MWD G/CC -2.394 0.607 0.0744973 13799 3806.5 10707 RPD MWD OHMM 0.08 2000 33.4436 21006 224.5 10727 RPM MwD OHMM 0.25 2000 29.8423 21006 224.5 10727 RPS MWD OHMM 0.06 1894.79 21.1708 21006 224.5 10727 RPx MwD OHMM 0.22 2000 16.677 21006 224.5 10727 FET MWD HR 0.14 137.72 1.68983 21006 224.5 10727 GR MwD API 12.86 114.78 67.2982 20977 232.5 10720.5 PEF MWD B/E 0.13 12.52 2.15117 13799 3806.5 10707 ROP MWD FPH 0.17 43242 202.907 20977 299.5 10787.5 NPHI MwD PU-S 6.69 117.61 37.336 13754 3806.5 10692 First Reading For Entire File..........224.5 Last Reading For Entire File...........10787.5 File Trailer Service name... .......STSLIB.001 SerV1Ce Sub L2vel.Ndme... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum physical Record..65535 Page 8 ~ ~ mph-1911.tapx File TyPe ................L0 Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH FCNT 6864.5 10691.5 NPHI 6864.5 10691.5 NCNT 6864.5 10691.5 RHOB 6876.0 10707.0 DRHO 6876.0 10707.0 PEF 6876.0 10707.0 GR 6891.5 10720.0 RPS 6897.5 10726.5 RPM 6897.5 10726.5 RPx 6897.5 10726.5 FET 6897.5 10726.5 RPD 6897.5 10726.5 $ T 6956.5. 10745.5 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MwD 5 1 6856.5 10780.0 REMARKS: MERGED MAD PASS. Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MAD CP30 4 1 68 4 2 Page 9 mph-1911.tapx NCNT MAD CP30 4 1 68 8 3 RHOB MAD G/CC 4 1 68 12 4 DRHO MAD G/CC 4 1 68 16 5 RPD MAD OHMM 4 1 68 20 6 RPM MAD OHMM 4 1 68 24 7 RPS MAD OHMM 4 1 68 28 8 RPX MAD OHMM 4 1 68 32 9 FET MAD HR 4 1 68 36 10 GR MAD API 4 1 68 40 11 PEF MAD B/E 4 1 68 44 12 RAT MAD FPH 4 1 68 48 13 NPHI MAD PU-S 4 1 68 52 14 First Last Name servi ce unit Min Max Mean Nsam Reading Reading DEPT FT 6864.5 10745.5 8805 7763 6864.5 10745.5 FCNT MAD CP30 80.4 964.5 204.234 7650 6864.5 10691.5 NCNT MAD CP30 12507.9 28814.1 17537.3 7650 6864.5 10691.5 RHOB MAD G/CC 2.02 2.85 2.22252 7658 6876 10707 DRHO MAD G/CC -0.49 0.53 0.0374771 7658 6876 10707 RPD MAD OHMM 5.99 108.98 21.4837 7656 6897.5 10726.5 RPM MAD OHMM 5.52 79.62 19.33 7656 6897.5 10726.5 RPS MAD OHMM 5.22 42.12 15.7824 7656 6897.5 10726.5 RPX MAD OHMM 3.96 35.26 11.7233 7656 6897.5 10726.5 FET MAD HR 0.51 128.01 51.0451 7656 6897.5 10726.5 GR MAD API 45.49 184.53 81.4696 7657 6891.5 10720 PEF MAD B/E 1.28 10.76 2.25079 7658 6876 10707 RAT MAD FPH 0.34 1561.95 244.561 7579 6956.5 10745.5 NPHI MAD PU-S 12.32 64.19 37.9549 7650 6864.5 10691.5 First Reading For Entire File..........6864.5 Last Reading For Entire File...........10745.5 File Trailer service name... .......STSLI6.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EoF File Header Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Page 10 i • mph-1911.tapx Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 222.5 3765.5 FET 222.5 3765.5 RPM 222.5 3765.5 RPS 222.5 3765.5 RPD 222.5 3765.5 GR 230.5 3772.5 ROP 296.5 3825.0 LOG HEADER DATA DATE LOGGED: O1-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 3825.0 TOP LOG INTERVAL (FT): 112.0 BOTTOM LOG INTERVAL (FT): 3825.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: 70.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 163686 EWR4 ELECTROMAG. RESIS. 4 77613 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 13.500 DRILLER'S CASING DEPTH (FT): 112.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.40 MUD VISCOSITY (S): 110.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 250 FLUID LOSS (C3): 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): 7.500 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 7.700 68.0 MUD FILTRATE AT MT: 9.000 70.0 MUD CAKE AT MT: 4.700 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Page 11 ~ ~ mph-1911.tapx Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MWDO10 OHMM 4 1 68 4 2 RPM MWDO10 OHMM 4 1 68 8 3 RPS MWDO10 OHMM 4 1 68 12 4 RPX MWD010 OHMM 4 1 68 16 5 FET MwD010 HR 4 1 68 20 6 GR MwD010 API 4 1 68 24 7 ROP MwD010 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 222.5 3825 2023.75 7206 222.5 3825 RPD MWDO10 OHMM 0.08 1799.49 34.7586 7087 222.5 3765.5 RPM MwD010 OHMM 0.27 1864.22 41.0973 7087 222.5 3765.5 RPS MWDO10 OHMM 0.27 890.12 27.9281 7087 222.5 3765.5 RPX MWDO10 OHMM 0.31 78.4 19.7792 7087 222.5 3765.5 FET MWDO10 HR 0.14 5.85 0.88885 7087 222.5 3765.5 GR MWDO10 API 11.9 112.38 64.5458 7085 230.5 3772.5 ROP MWDO10 FPH 3.85 4157.31 192.947 7058 296.5 3825 First Reading For Entire File..........222.5 Last Reading For Entire File...........3825 File Trailer Service name... .......STSLIB.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB,004 Physical EOF File Header service name... .......STSLI6.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.003 Comment Record Page 12 • mph-1911.tapx FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 3766.0 6871.0 RPx 3766.0 6871.0 RPM 3766.0 6871.0 FET 3766.0 6871.0 RPD 3766.0 6871.0 GR 3773.0 6871.0 RHOB 3800.0 6871.0 FONT 3800.0 6871.0 NCNT 3800.0 6871.0 NPHI 3800.0 6871.0 PEF 3800.0 6871.0 DRHO 3800.0 6871.0 ROP 3825.5 6871.0 LOG HEADER DATA DATE LOGGED: 06-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 6871.0 TOP LOG INTERVAL (FT): 3825.0 BOTTOM LOG INTERVAL (FT): 6871.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.1 MAXIMUM ANGLE: 87.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBE R DGR DUAL GAMMA RAY 053516 EWR4 ELECTROMAG. RESIS. 4 105242 CTN COMP THERMAL NEUTRON 231172 ALD Azimuthal Litho-Dens 10640608 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3814.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): 53.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 400 FLUID LOSS (C3): 7.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 6.000 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .000 .O MUD FILTRATE AT MT: 7.000 65.0 MUD CAKE AT MT: 4.500 65.0 Page 13 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: mph-1911.tapx Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FONT MwD020 cP30 4 1 68 4 2 NCNT MWD020 CP30 4 1 68 8 3 RHOB MWD020 G/CC 4 1 68 12 4 DRHO MWD020 G/CC 4 1 68 16 5 RPD MWD020 OHMM 4 1 68 20 6 RPM MWD020 OHMM 4 1 68 24 7 RPS MWD020 OHMM 4 1 68 28 8 RPX MwD020 OHMM 4 1 68 32 9 FET MWD020 HR 4 1 68 36 10 GR MWD020 API 4 1 68 40 11 PEF MWD020 B/E 4 1 68 44 12 RoP MwD020 FPH 4 1 68 48 13 NPHI MWD020 PU-S 4 1 68 52 14 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 3766 6871 5318.5 6211 3766 6871 FONT MwD020 cP30 730.98 5211.73 1180.91 6130 3800 6871 NCNT MwD020 CP30 183538 354114 219523 6130 3800 6871 RHOB MWD020 G/CC 0.613 2.662 2.04484 6143 3800 6871 DRHO MWD020 G/CC -2.394 0.415 0.0755644 6143 3800 6871 RPD MWD020 OHMM 0.22 2000 37.511 6211 3766 6871 RPM MwD020 OHMM 0.25 2000 21.0286 6211 3766 6871 RPS MWD020 OHMM 0.06 280.84 12.8904 6211 3766 6871 RPX MWD020 OHMM 1.08 2000 11.9403 6211 3766 6871 FET MwD020 HR 0.15 77.04 2.19805 6211 3766 6871 GR MwD020 API 12.88 114.78 64.9761 6197 3773 6871 PEF MWD020 B/E 0.13 12.52 2.09131 6143 3800 6871 ROP MWD020 FPH 4.69 43242 268.923 6092 3825.5 6871 NPHI MwD020 Pu-s 6.69 117.61 35.1901 6130 3800 6871 First Reading For Entire File..........3766 Last Reading For Entire File...........6871 Page 14 mph-1911.tapx File Trailer Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLI6.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 6871.5 6903.0 LOG HEADER DATA DATE LOGGED: 11-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 6903.0 TOP LOG INTERVAL (FT): 6871.0 BOTTOM LOG INTERVAL (FT): 6903.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: .O TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 999999 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3814.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S): .O MUD PH: .O Page 15 mph-1911.tapx MUD CHLORIDES (PPM): 0 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 .O MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 ROP MwD030 FPH 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6871.5 6903 6887.25 64 6871.5 6903 ROP MWD030 FPH 3.77 99.49 37.4237 64 6871.5 6903 First Reading For Entire File..........6871.5 Last Reading For Entire File...........6903 File Trailer Service name... .....,.STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLI6.006 service sub Level Name... Page 16 • • mph -1911.tapx version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEF 6871.5 8006.5 RPx 6871.5 8026.5 RPD 6871.5 8026.5 FET 6871.5 8026.5 RPS 6871.5 8026.5 RPM 6871.5 8026.5 DRHO 6871.5 8006.5 FCNT 6871.5 7991.5 GR 6871.5 8020.0 RHOB 6871.5 8006.5 NCNT 6871.5 7991.5 NPHI 6871.5 7991.5 RoP 6903.5 8086.5 LOG HEADER DATA DATE LOGGED: 12-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 8087.0 TOP LOG INTERVAL (FT): 6903.0 BOTTOM LOG INTERVAL (FT): 8087.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 74.8 MAXIMUM ANGLE: 93.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 232602 CTN COMP THERMAL NE UTRON 113136 EWR4 Electromag Resi s. 4 228502 ALD Azimuthal Litho -Dens 231386 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 6885.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 55.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 20000 Page 17 mph-1911.tapx FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .280 MUD AT MAX CIRCULATING TERMPERATURE: .230 MUD FILTRATE AT MT: .230 MUD CAKE AT MT: .320 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel 65.0 78.8 65.0 65.0 DEPT FT 4 1 68 0 1 FONT MWD040 cP30 4 1 68 4 2 NCNT MwD040 CP30 4 1 68 8 3 RHOB MWD040 G/CC 4 1 68 12 4 DRHO MWD040 G/CC 4 1 68 16 5 RPD MWD040 OHMM 4 1 68 20 6 RPM MWD040 OHMM 4 1 68 24 7 RPS MWD040 OHMM 4 1 68 28 8 RPX MWD040 OHMM 4 1 68 32 9 FET MWD040 HR 4 1 68 36 10 GR MWD040 API 4 1 68 40 11 PEF MwD040 B/E 4 1 68 44 12 ROP MWD040 FPH 4 1 68 48 13 NPHI MWD040 PU-S 4 1 68 52 14 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 6871.5 8086.5 7479 2431 6871.5 8086.5 FCNT MWD040 CP30 74.3 904.87 182.522 2241 6871.5 7991.5 NCNT MWD040 cP30 12084.3 29636.1 16463.1 2241 6871.5 7991.5 RHOB MWD040 G/CC 1.461 3.021 2.19257 2271 6871.5 8006.5 DRHO MWD040 G/CC -0.928 0.577 0.0621598 2271 6871.5 8006.5 RPD MWD040 OHMM 0.77 2000 38.1287 2311 6871.5 8026.5 RPM MWD040 OHMM 0.56 2000 34.6967 2311 6871.5 8026.5 RPS MWD040 OHMM 0.18 1894.79 23.7894 2311 6871.5 8026.5 RPX MWD040 OHMM 0.22 2000 21.6943 2311 6871.5 8026.5 FET MWD040 HR 0.42 137.72 3.30672 2311 6871.5 8026.5 GR MwD040 API 33.87 92.41 68.5305 2298 6871.5 8020 PEF MwD040 B/E 1.48 12.06 2.24525 2271 6871.5 8006.5 ROP MWD040 FPH 0.17 841.8 161.443 2367 6903.5 8086.5 Page 18 mph-1911.tapx NPHI MWD040 PU-S 13.12 70.48 39.9868 First Reading For Entire File..........6871.5 Last Reading For Entire File...........8086.5 File Trailer Service name... .......STSLIB.006 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................LO Next File Name...........sTSLI6.007 Physical EOF File Header Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 7994.5 10684.5 NPHI 7994.5 10684.5 FONT 7994.5 10684.5 RHOB 8008.5 10699.5 DRHO 8008.5 10699.5 PEF 8008.5 10699.5 GR 8020.5 10713.0 FET 8027.0 10719.5 RPD 8027.0 10719.5 RPS 8027.0 10719.5 RPM 8027.0 10719.5 RPx 8027.0 10719.5 ROP 8087.0 10780.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): • 2241 6871.5 7991.5 header data for each bit run in separate files. 5 .5000 16-DEC-07 Insite 74.11 Memory 10780.0 8087.0 10780.0 Page 19 • • mph-1911.tapx BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 84.0 MAXIMUM ANGLE: 94.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 232602 CTN COMP THERMAL NEUTRON 113136 EWR4 Electromag Resis. 4 228502 ALD Azimuthal Litho-Dens 231386 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 6885.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 51.0 MUD PH: 9,Q MUD CHLORIDES (PPM): 20000 FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .250 60.0 MUD AT MAX CIRCULATING TERMPERATURE: .170 91.9 MUD FILTRATE AT MT: .190 60.0 MUD CAKE AT MT: .310 60.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging DireCtion .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FONT MWD050 cP30 4 1 68 4 2 NCNT MWD050 CP30 4 1 68 8 3 RHOB MWD050 G/CC 4 1 68 12 4 DRHO MWD050 G/CC 4 1 68 16 5 RPD MWD050 OHMM 4 1 68 20 6 RPM MWD050 OHMM 4 1 68 24 7 RPS MwD050 OHMM 4 1 68 28 8 RPX MWD050 OHMM 4 1 68 32 9 Page 20 mph-1911.tapx FET MWD050 HR 4 1 68 36 10 GR MwD050 API 4 1 68 40 11 PEF MwD050 B/E 4 1 68 44 12 RoP MWD050 FPH 4 1 68 48 13 NPHI MWD050 PU-S 4 1 68 52 14 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 7994.5 10780 9387.25 5572 7994.5 10780 FCNT MWD050 CP30 107.21 729.95 189.836 5381 7994.5 10684.5 NCNT MWD050 CP30 13250.1 27411 16824.8 5381 7994.5 10684.5 RHOB MWD050 G/CC 1.47 2.777 2.23424 5383 8008.5 10699.5 DRHO MWD050 G/CC -0.328 0.607 0.078653 5383 8008.5 10699.5 RPD MWD050 OHMM 5.8 153.47 23.3477 5386 8027 10719.5 RPM MWD050 OHMM 5.53 119.22 22.5609 5386 8027 10719.5 RPS MWD050 OHMM 5.41 64.36 20.5513 5386 8027 10719.5 RPX MWD050 OHMM 4.8 44.63 15.8416 5386 8027 10719.5 FET MwD050 HR 0.39 20.99 1.38636 5386 8027 10719.5 GR MWD050 API 43.4 106.63 73.1945 5386 8020.5 10713 PEF MwD050 B/E 0.62 6.39 2.18177 5383 8008.5 10699.5 ROP MWD050 FPH 0.79 1057.37 161.047 5387 8087 10780 NPHI MwD050 PU-S 16.37 52.62 38.6906 5381 7994.5 10684.5 First Reading For Entire File..........7994.5 Last Reading For Entire File...........10780 File Trailer Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.008 Physical EOF File Header Service name... .......STSLI6.008 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MAD curves and log header data DEPTH INCREMENT: .5000 MAD RUN NUMBER: 5 MAD PASS NUMBER: 1 FILE SUMMARY for each pass of each run in separate files. VENDOR TOOL CODE START DEPTH STOP DEPTH Page 21 • • mph-1911.tapx NPHI 6856.5 10684.0 FCNT 6856.5 10684.0 NCNT 6856.5 10684.0 PEF 6868.5 10699.5 RHOB 6868.5 10699.5 DRHO 6868.5 10699.5 GR 6884.0 10712.5 RPD 6890.0 10719.0 FET 6890.0 10719.0 RPX 6890.0 10719.0 RPS 6890.0 10719.0 RPM 6890.0 10719.0 RAT 6949.0 10738.0 LOG HEADER DATA DATE LOGGED: 16-DEC-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10780.0 TOP LOG INTERVAL (FT): 6856.0 BOTTOM LOG INTERVAL (FT): 10780.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 84.0 MAXIMUM ANGLE: 94.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 232602 CTN COMP THERMAL NEUTRON 113136 EWR4 Electromag Resis. 4 228502 ALD Azimuthal Litho-Dens 231386 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 6885.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S); 51.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 20000 FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .250 60.0 MUD AT MAX CIRCULATING TERMPERATURE: .170 91.9 MUD FILTRATE AT MT: .190 60.0 MUD CAKE AT MT: .310 60.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Page 22 s • mph-1911.tapx Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Di rection .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FONT MAD051 CP30 4 1 68 4 2 NCNT MAD051 CP30 4 1 68 8 3 RHOB MAD051 G/CC 4 1 68 12 4 DRHO MAD051 G/CC 4 1 68 16 5 RPD MAD051 OHMM 4 1 68 20 6 RPM MAD051 OHMM 4 1 68 24 7 RPS MAD051 OHMM 4 1 68 28 8 RPx MAD051 OHMM 4 1 68 32 9 FET MAD051 HR 4 1 68 36 10 GR MAD051 API 4 1 68 40 11 PEF MAD051 B/E 4 1 68 44 12 RAT MAD051 FPH 4 1 68 48 13 NPHI MAD051 Pu-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6856.5 10738 8797.25 7764 6856.5 10738 FCNT MAD051 CP30 80.4 964.5 204.219 7651 6856.5 10684 NCNT MAD051 CP30 12507.9 28814.1 17536.7 7651 6856.5 10684 RHOB MAD051 G/CC 2.02 2.85 2.22252 7658 6868.5 10699.5 DRHO MAD051 G/CC -0.49 0.53 0.0374771 7658 6868.5 10699.5 RPD MAD051 OHMM 5.99 108.98 21.4837 7656 6890 10719 RPM MAD051 OHMM 5.52 79.62 19.33 7656 6890 10719 RPS MAD051 OHMM 5.22 42.12 15.7824 7656 6890 10719 RPx MAD051 OHMM 3.96 35.26 11.7233 7656 6890 10719 FET MAD051 HR 0.51 128.01 51.0451 7656 6890 10719 GR MAD051 API 45.49 184.53 81.4696 7657 6884 10712.5 PEF MAD051 B/E 1.28 10.76 2.25079 7658 6868.5 10699.5 RAT MAD051 FPH 0.34 1561.95 244.561 7579 6949 10738 NPHI MAD051 Pu-S 12.32 64.19 37.9576 7651 6856.5 10684 First Reading For Entire File..........6856.5 Last Reading For Entire File...........10738 File Trailer Service name... .......STSLIB.008 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/03/12 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.009 Page 23 ! • mph-1911.tapx Physical EOF Tape Trailer Service name .............LISTPE gate . ...................08/03/12 Origin ...................STS Tape Name. .... ........UNKNOWN continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer service name .............LISTPE gate . ...................08/03/12 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF End Of LIS File LJ Scientific Technical services scientific Technical services Page 24