Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-031
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM N ` WELLOMPLETION OR RECOMPLETION REPO T AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned ® • Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development IZ*Exploratory ❑ GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero Service ❑ Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 3/28/2017 . 206-031 • 317-021 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 4/25/2006 - 50-029-22668-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 5/3/2006 ' PBU NK-14A • Surface: 1358'FSL,944'FEL,Sec.36,T12N,R15E,UM • 9 Ref Elevations KB 59 8 17. Field/Pool(s): Top of Productive Interval: 3831'FSL,1593'FEL,Sec.23,T12N,R15E,UM GL 19.1 BF 22.02 . PRUDHOE BAY,NIAKUK OIL • Total Depth: 2968'FSL,2233'FEL,SEc.23,T12N,R15E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 12928'/7088' • ADL 034630&034625 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 721618• y- 5979895 ' Zone - ASP 4 • 19660'/9072' • 84-062 TPI: x- 715305 y- 5992749 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 714690 y- 5991868 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No ® 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 18219'/9144' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/SGRD/SGRC/EWR/SROP SCANNED !/ ;' 1 8 202, 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. ' - PULLED TOP BOTTOM TOP BOTTOM 20" 94# H-40 41' 121' 41' 121' 30" 260 sx Arctic Set(Approx.) 13-3/8" 68# L-80 40' 6417' 40' 4518' 16" 2000 sx PF'E',894 sx Class'G',240 sx PF'C' 9-5/8" 47# L-80 38' 18121' 38' 9103' 12-1/4" 375 sx Class'G' 7" 29# L-80 17962' 18219' 9039' 9144' 8-1/2" 200 sx Class'G' 24. Open to production or injection? Yes 0 No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#L-80 13112'-17982' 17925'/9025' {>rti1)00N'C`p 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. RECEIVED Was hydraulic fracturing used during completion? Yes El No D. /�� 1'� Per 20 AAC 25.283(i)(2)attach electronic and printed l r APR 2 information 5 2017 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED L' 16642' 92 Bbls Class'G' , CG CC 13112' Cut&Pull Tubing 12928' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period .....► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate '®*" Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only ic,I/'TL �//o/� ��4�7 RDDMS Lt- �, ":`� - 2 2017 ./ r.rz 28. CORE DATA • Conventional Core(s) Yes 0 No EI • Sidewall Cores Yes 0 No E1 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No IZI Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 18215' 9143' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kuparuk 18215' 9143' 6FS 18215' 9143' 5AA 18281' 9168' 4BB 18389' 9191' 5AA(Invert) 18841' 9181' 6FS 19479' 9109' Kuparuk 19610' 9081' HRZ 19612' 9081' Formation at total depth: HRZ(From Base) 19612' • 9081' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Thompson,Jacob Email: Jacob.Thompson@BP.com Printed Name: Joe Lastuf Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: 4/ 6/1 1 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • Daily Report of Well Operations NK-14A ACTIVITYDATE SUMMARY CTU #14- 1.75" Coil Job Objective: Pre-Rig Cement P&A Complete weekly BOP Test. RIH with cementing BHA with 2.75" BDJSN. While RIH circulate slick 1% KCI with Baroid CFS-520. Dry tag at 18080'. Get up weight and shift depth to 18089' elm. Puh 10' and flag pipe. Puh to 17980' &circulate out well with 1% KCI w/CFS-520, taking returns from both tbg & IA at the same time. Once clean KCL from both IA and tubing, pump diesel down tubing to open pocket at 4004' and then back up IA to surface. Begin mixing cement. 2/13/2017 ...Continued on WSR 2-14-17... CTU #14 - 1.75" Coil ***Cont. from WSR 2-13-17*** Job Objective: Pre-Rig Cement P&A Pump 92 bbls of 12.0 ppg HES Class G Cement(105 bbls on surface) and lay in form 18080' to 16591' allowing it to U-tube into the IA. PUH to safety at 12000' pumping coil displacement down the backside. Wait 1 hour for cement to settle and then drop 7/8" ball for BDJSN and contaminate with powervis down to 16,642'. Chase ooh @ 80%. Did not have a return MM to watch density but regular samples were taken & no cement traces were noticed. Jet tree & bop's. RBIH & lay in Diesel Freeze Protect from 2500'tvd. IA is Freeze Protected with Diesel down to 4004' md. Rig Down CTU. 2/14/2017 ***Job Complete*** T/I/O=SSV/0+/100, Temp=SI. PPPOT-T(PASS), PPPOT-IC (PASS). Pre RST. PPPOT-T: Stung into test port, (100 psi), bled void to 0 psi. Monitored for 10 minutes, no change in pressure. Functioned LDS (ET), all moved freely (1"). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 50 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port, (0+ psi), bled void to 0 psi. Monitored for 10 minutes, no change in pressure. Functioned LDS (ET), all moved freely (1"). Pumped through void, good returns. Pressured void to 3500 psi for 30 minute test, lost 100 psi in 15 minutes, lost 2/18/2017 50 psi in second 15 min (PASS). Bled void to 0 psi. ***WELL S/I ON ARRIVAL SWCP 4518***(side track) IN HOLE W/3.70" CENT&2.50" S-BAILER. 2/19/2017 ***CONTINUE WSR TO 2/20/17*** ***CONTINUE WSR FROM 2/19/17 SWCP 4518***(sidetrack) DRIFT W/3.70" CENT& S-BAILER TO TOC @ 16,646' SLM(no sample) 2/20/2017 ***WELL LEFT S/I ON DEPARTURE*** ***WELL S/I ON ARRIVAL SWCP 4518***(sidetrack) RAN 3.25" CENT, 2' 1-7/8", 3.0" CENT, XO, 1.75" S-BAILER TAG TOC @ 16,653' SLM (RECOVERED APPROX 2CUPS OF CEMENT) 2/21/2017 ***WELL LEFT S/I, DSO NOTIFIED ON DEPARTURE*** • • Daily Report of Well Operations NK-14A T/I/0=30/30/200 SI Perform MITs (SIDETRACK) CMIT TxIA to 4049/4116 psi ***PASSED*** Target pressure=4000 psi Max applied pressure=4200 psi. MIT OA to 1080 psi ***PASSED*** Target pressure=1080 psi Max applied pressure=1200 psi. Pumped 20.4 bbls DSL down IA to achieve test pressure of 4200 psi TxIA. 15 min loss of 42/42 psi, 30 min loss of 22/23 psi, additional 15 mins loss of 16/17 psi, for total loss of 38/40 psi in 30 mins. Bled TxIA to 0 psi, bled back xx bbls. Pumped 2.5 bbls DSL down OA to achieve test pressure of 1200 psi. 15 min loss of 50 psi, 30 min loss of 22 psi, for total loss of 72 psi in 30 mins. Bled OA pressure to 0 psi, bled back 2 bbls. WSL/DSO notified Tags hung on WV/IA/OA AFE sign hung on MV***FLUID PACKED WELL*** 2/21/2017 Valve positions=SV WV SSV closed MV open CVs OTG FWHP=30/50/80 ***JOB STARTED 28-FEB-2017. WELL SI ON ARRIVAL***(SLB ELINE TUBING CUT) SWING OVER FROM NK-15. RU. PT. RIH WITH 3.65" POWER CUTTER OAL=35', 350#. CUT TUBING AT 13112'. CCL TO MID ELEMENT: 28.7'. CCL TO STOP DEPTH: 13083.3'. GOOD INDICATION OF CUT. POOH. LOG TIED INTO TUBING SUMMARY DATED 2-JUNE-1996 RDMO. FINAL T/I/O = 50/150/100. 2/28/2017 ***WELL SI ON DEPARTURE. JOB COMPLETE 28-FEBRUARY-2017.*** T/I/O= 0/34/171. CMIT-TxIA to 4000 psi PASSED (Sidetrack) Pumped 20 bbls of ambient diesel to achieve test pressure of 4163 psi (4200 psi max applied), TxIA each lost 23 psi/ 1st 15 min. TxIA each lost 14 psi/2nd 15 min. Bled back 19 bbls to FWHP= 2/28/2017 0/62/114. WV, SV, SSV are closed. MV is open. IA/OA are OTG. DSO notified of well ***WELL SHUT IN ON ARRIVAL*** (Sidetrack) TAG 4-1/2"TRSSSV W/3.86" GAUGE RING @ 2087' SLM/2120' MD ATTEMPT TO SET NORTHERN SOLUTIONS ANCHORED HOLD OPEN SLEEVE IN SVLN (3" MINIMUM ID); SET DOWN @ 1993' SLM (ANCHOR SHEARED) BRUSH TBG. W/4-1/2" BRUSH &TAG TRSSSV @ 2087' SLM SET HOLD OPEN SLEEVE W/ NORTHERN SOLUTIONS ANCHOR IN TRSSSV @ 2120' MD 3/4/2017 ***WELL LEFT SHUT IN, DSO NOTIFIED*** T/I/O = TWC/440/120. C/O w/day shift. PT'd I/A&0/A piggyback valves, 300/low& 3/5/2017 3500/high (Passed). Charted & retained in TRP folder. ***Job Complete*** T/I/O= 400/440/120 Set 4" CIW"H"TWC#440 @ 124"with no ext. RD upper tree, Added SV to MV(Pre-Parker Dry Hole Conversion) Torqued to API Specs. PT'd 300/5000 psi =PASS . RD PBIA/ RU PBOA Temp Valve#71 with 1502 cap. RU PBIA Temp Valve#30 with 1502 cap. Turned over to Night Crew FWP=TWC/440/120 ***Job In Progress*** 3/5/2017 (See Log for details) T/I/O = TWC/300/120. Temp = SI. Bleed IAP & OAP < 50 psi (Pre-Rig). Flow line disconnected, no well house, dry hole tree installed. IA&OA FL @ surface. Bled IAP to bleed tank from 300 psi to 0 psi in 20 min, 3.8 bbls. Bled OAP from 120 psi to 0 psi in 5 min, 7 gal. Monitored for 30 min. During monitor IAP & OAP unchanged. Final WHPs = TWC/0/0. 3/7/2017 MV, SV= C. IA, OA= OTG. 13:30 T/I/O = TWC/10/50. Temp = SI. WHP's (Pre Rig). No scaffolding, flowline. Dry hole tree installed, Rig WH installed. IAP increased 10, OAP increased 50 psi since 3/7/17. 3/11/2017 SV, MV= C. IA, OA= OTG. 19:00. T/I/O = TWC/10/50. Temp = SI. WHP's (Pre Rig). No scaffolding, flowline. Dry hole tree installed, Rig WH installed. IA& OA FLs @ surface. IAP & OAP unchanged since last monitor on 03/11/17. 3/14/2017 SV, MV= C. IA, OA= OTG. 00:01 • Daily Report of Well Operations NK-14A T/I/O = TWC/10/60. Temp = SI. Bleed OAP. (Pre-Rig). Flow line & scaffold removed, dry hole tree installed. IA, OA FL's @ Surface. Bled OAP from 60 psi to 0 psi in 2 minutes (10 gallons of fluid returned). Rig down & monitor for 30 minutes. No change in WHP's during 30 minute monitor. Final WHP's =TWC/10/0+. 3/18/2017 SV, MV= C. IA, OA= OTG. 21:45 T/I/O = TWC/10/10. Temp = SI. WHP's. (Pre Rig). WH, Flow line removed, Dry hole tree installed. No change in IAP, OAP increased 10 psi overnight. 3/19/2017 SV, MV= C. IA, OA= OTG. 19:25 • . • North America-ALASKA-BP Page 10:448 Operation Sa .F =eport Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00.00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL©67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) � (usft) 3/20/2017 12:00 - 14:30 2.50 RIGD P PRE BEGIN RON EVENT WITH PARKER RIG 272 AT 12:00 ON 3/21/2017. GENERAL RIG DOWN OPERATIONS ON V-08: -RIG DOWN INTERCONNECTS -COMPLETE INSTALLATION OF HEATER BOX IN DERRICK COMPELTE DERRICK INSPECTION AND PRE-LOWERING CHECKLIST FINALIZE CLEANING OF V-08 CELLAR -SKID CATTLE CHUTE INTO MOVE POSITION 14:30 - 15:00 0.50 RIGD P PRE LOWER MAST -HOOKLOAD PRIOR TO LANDING ON STAND =400 KLBS 15:00 - 16:30 1.50 RIGD P PRE GENERAL RIG DOWN OPERATIONS -RIG DOWN ELECTRICAL INTERCONNECTS -WARM UP MOVING SYSTEMS -FINAL WALKAROUNDS PRIOR TO SPLITTING _MODULES 16:30 - 20:30 4.00 RIGD P PRE SPLIT MODULES AND PULL OFF OF V-08. SPOT MODULES ON V PAD,LINEUP AND PREPARE TO MOVE. PULL DUMMY WELLHOUSE OFF V-08 AND PLACE ON PAD FOR PICKUP AND TRANSPORT BY WELLS SUPPORT -HOLD PJSM FOR MOVING WITH SECURITY 20:30 - 00:00 3.50 RIGD P PRE MOVE RIG TOWARDS NIAKUK -THREE MODULES MOVING TOGETHER -V PAD ACCESS ROAD TO LEFT TURN ON SPINE. TRAVEL TO MOBILE PAD AT MIDNIGHT. 3/21/2017 00:00 - 01:30 1.50 MOB P PRE MOVE RIG TOWARDS NIAKUK -TRAVEL FROM MOBILE PAD TO WESTERN KUPARUK RIVER BRIDGE 01:30 - 11:00 9.50 MOB N HMAN 1.66 PRE CONTACT BRIDGE RAILAT ENTRANCE TO WESTERN KUPARUK RIVER BRIDGE -FRONT CORNER OF DRILL MOD UNEXPECTEDLY DIPPED DURING TRANSITION ONTO RIG MATS AND CONTACTED BRIDGE GUARD RAIL. I-WAIT ON BRIDGE ENGINEER TO ASSESS DAMAGE AND CONFIRM BRIDGE INTEGRITY -BACKED UP AND HAD LOADER PULL RIG MATS LEADING UP TO BRIDGE. -CLEANED UP ROAD UNDER RIG MATS TO REDUCE AMOUNT OF FLEX IN MATS AND PLACED ADDITIONAL MATS IN FRONT OF BRIDGE ENTRANCE. -RECEIVED ATP FROM ANCHORAGE LEADERSHIP AFTER REVIEW OF BRIDGE ENGINEERS FINDINGS AND NEW RISK ASSESSMENT FOR CONTINUED RIG MOVE OPERATIONS. 11:00 - 19:00 8.00 MOB P PRE MOVE RIG TOWARDS NIAKUK ALONG SPINE ROAD -TRAVEL FROM KUPARUK RIVER BRIDGE TO K-PAD ACCESS ROAD Printed 4/18/2017 4:32:21 PM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 2 ct-46- Operation Summary Report Common Well Name:NK-14 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 00:00 5.00 MOB P PRE MOVE RIG TOWARDS NIAKUK ALONG K-PAD ACCESS ROAD -TRAVEL FROM INTERSECTION WITH SPINE ROAD TO INTERSECTION WITH WEST DOCK ROAD 3/22/2017 00:00 - 06:00 6.00 MOB P PRE MOVE RIG TOWARDS NIAKUK ALONG WEST DOCK ROAD TRAVEL FROM INTERSECTION WITH K-PAD ACCESS ROAD TO SPINE ROAD IN FRONT OF MCC 06:00 - 10:30 4.50 MOB P PRE MOVE RIG TOWARDS NIAKUK ALONG SPINE ROAD AND EAST DOCK ROAD -TRAVEL FROM SPINE ROAD IN FRONT OF MCC TO L5/NIAKUKACCESS ROAD 10:30 - 12:00 1.50 MOB P PRE MOVE RIG TO NIAKUKAND STAGE ON PAD PRIOR TO SPOTTING OVER NK-14B TRAVEL ALONG L5 f NIAKUK ACCESS ROAD TO NIAKUK PAD 12:00 - 15:30 3.50 MOB P PRE SPOT DRILLMODULE,MUD MODULE AND UTILITY MODULE OVER NK-14B AND SHIM TO LEVEL. 15:30 - 17:00 1.50 RIGU P PRE GENERAL RIG UP RIG UP PIPE SHED INSTALL HARD LINES BETWEEN MODULES. -CONNECT STEAM LINES. -CONNECTALL INTERCONNECTS BETWEEN MODULES. -PERFORM PRE-RAISE DERRICK CHECKLIST. 17:00 - 17:30 0.50 RIGU P PRE RAISE DERRICK -PERFORM CHECKLISTAND PJSM -520 KLBS PU WEIGHT OFF STAND 17:30 - 19:00 1.50 RIGU P PRE RIG UP RIG FLOOR -SKID FLOOR AND SLIDE CATTLE CHUTE INTO POSITION -SET MAN RIDERS IN PLACE -INSTALL ROOF WALKWAYS AND HANDRAILS SIMOPS: -INSTALL CUTTINGS BOX -CONTINUE INTERCONNECT WORK 19:00 - 21:00 2.00 RIGU P PRE BRIDLE DOWN -HANG BACK BRIDLE LINES&SECURE -RIG UP TOP DRIVE AND BLOCKS -COMPLETE INTERCONNECT WORK 21:00 - 21:30 0.50 RIGU P PRE PERFORM POST RIG MOVE/DERRICK INSPECTION 21:30 - 23:30 2.00 RIGU P PRE GENERAL RIG UP ,-INSTALL BLACK JACK AND GREASE -CHANGE SAVER SUB FROM 4"HT-38 TO NC50 -PERFORM PRE-SPUD CHECKLISTS -TAKE ON SEAWATER TO THE PITS FOR PVT CALIBRATION. 23:30 - 00:30 1.00 RIGU P PRE HELD PRE-SPUD MEETING WITH BOTH CREWS Printed 4/18/2017 4:32.21PM *All depths reported in Drillers Depths" • North America-ALASKA-BP Page 3 afj8 Operation Summary Report Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: 'X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL©67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/23/2017 00:00 - 03:00 3.00 RIGU P PRE CONTINUE GENERAL RIG UP OPERATIONS -COMPLETE PRE-SPUD CHECKLISTS -CALIBRATE BLOCK HEIGHT -FILL AND PRESSURE TEST SURFACE LINES TO 5000 PSI -CONTINUE TO CALIBRATE PVT SENSORS -RIG UP ON IAAND TREE TO TEST TWC. ADJUST NEW CROWN-O-MATIC ***RIG ACCEPTED AT 00:01 03/23/2017*** 03:00 - 03:30 0.50 RIGU P PRE HELD H2S/RIG EVACUATION DRILL AND AAR WITH RIG CREW 03:30 - 04:30 1.00 DHB P PRE PRESSURE TEST TWC -TEST FROM BELOW250/4000 PSI FOR 5 CHARTED MIN EACH;GOOD TEST -TEST FROM ABOVE 250/4300 PSI FOR 5 CHARTED MIN EACH;GOOD TEST 04:30 - 08.00 3.50 DHB N SFAL 1.66 PRE DRILLER OBSERVED AN EXCESSIVE AMOUNT OF AIR AND UNKNOWN FLUID AT TEST PUMP WHEN ATTEMPTING TO BLEED DOWN LINES AFTER TESTING TWC FROM ABOVE. ATTEMPT TO DIAGNOSE ISSUE AND DISCUSS WITH ODE.DETERMINE THAT WELL IS NOT FLUID PACKED ON BOTH SIDES AND OUT OF BALANCE.DECISION WAS MADE TO PULL THE TWC AND FLUID PACK TUBING AND IA. 08:00 - 10:30 2.50 DHB N SFAL 1.96 PRE PULL TWC WITH LUBRICATOR AND LAY DOWN -RIG UP LUBRICATOR TO TREE AND PT; 250/4000 PSI-GOOD TEST -PULL TWC -LAY DOWN TWC AND LUBRICATOR 10:30 - 13:30 3.00 DHB N SFAL 1.66 PRE ATTEMPT TO FLUID PACK BOTH TUBING AND IA -PUMP 4 BBLS INTO IA UNTIL RETURNS OBSERVED ON TUBING. -ATTEMPT TO VERIFY WELL IS BALANCED;IA ON A VAC AND WELL ATTEMPTING TO U-TUBE. -SHUT DOWN AND DISCUSS WITH ODE WITH THE MULTIPLE CIRCULATION POINTS (GLM POCKETS WERE LEFT OPEN PRE-RIG AND TUBING WAS CUT)WELL REMAINS OUT OF BALANCE.DECISION MADE TO CIRCULATE OUT THE WELL TO CLEAN SEAWATER PRIOR TO CONTINUING. -RIG UP TO CIRCULATE DIESEL FREEZE PROTECT OUT TO THE TIGER TANK SIMOPS: -BUILD STANDS OF 5"PIPE OFF-LINE Printed 4/18/2017 4.32.21PM *AII depths reported in Drillers Depths* North America-ALASKA-BP Page 4 03 Operation Summary Report Common Wet Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: IX3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL©67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 16:00 2.50 DHB P PRE CIRCULATE 350 BBLS OF SEAWATER DOWN THE TUBING TAKING RETURNS TO THE TIGER TANK -5 BPM;750 PSI -BLOW DOWN ALL LINES -SEND DIESEL RETURNS TO HYDROCARBON RECYCLE SIMOPS: -BUILD STANDS OF 5"PIPE OFF-LINE -MOVING RIG CAMP FROM MOBILE PAD TO MCC 16:00 - 19:00 3.00 DHB N SFAL 1.66 PRE INSTALL AND TEST TWC -INSTALL TWC WITH LUBRICATOR -PRESSURE TEST TWC FROM ABOVE TO 250/4300 PSI FOR 5 MIN EACH:GOOD TEST -PRESSURE TEST TWC FROM BELOW TO 250/4000 PSI FOR 5 MIN EACH:GOOD TEST SIMOPS: -BUILD STANDS OF 5"PIPE OFF-LINE(FROM 12:00 TO 18:00 BUILT 41 STANDS) MOVING RIG CAMP FROM MOBILE PAD TO -MCC 19:00 - 20:00 1.40 DHB P PRE BLOW DOWN ALL LINES AND RIG DOWN SECONDARY KILL FROM IA PULL LUBRICATOR TO RIG FLOOR AND LAY DOWN IN PIPE SHED SIMOPS: -MOVING RIG CAMP FROM MOBILE PAD TO MCC 20:00 - 20:30 0.50 BOPSUR P PRE SERVICE RIG;SERVICE ON-LINE AND OFF-LINE ST-80. SIMOPS: -MOVING RIG CAMP FROM MOBILE PAD TO MCC 20:30 - 22:30 2.00 BOPSUR P PRE NIPPLE DOWN ADAPTER FLANGE AND TREE -SUCK OUT TREE AND BLEED OFF HANGER VOID -BREAK BOLTS AND RAISE TREE TO BOP DECK -FMC REPRESENTATIVE CAPPED CONTROL LINES AND INSPECTED HANGER -HANGER THREADS LOOK GOOD.7 3/4 TURNS TO MAKE UP XO. SIMOPS: -MOVING RIG CAMP FROM MOBILE PAD TO ,MCC 22:30 - 00:00 1.50 BOPSUR P PRE NIPPLE UP RISERS AND BOPE STACK -LOWER HIGH PRESSURE RISERS ONTO WELLHEAD AND INSTALL BOLTS -NIPPLE UP BOPE STACK ON HIGH PRESSURE RISERS -TORQUE ALL CONNECTIONS -MAKE UP TEST MANIFOLDS FOR BOP TEST SIMOPS: -MOVING RIG CAMP FROM MOBILE PAD TO MCC Printed 4/18/2017 4.32:21PM *All depths reported in Drillers Depths* 410• • North America-ALASKA-BP Page 5, ` Operation Summary Report - � 4343 4343 ...--- Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: X3430183C-C:(7,313,635 00) Project:Niakuk ', Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/24/2017 00:00 - 02:30 2.50 BOPSUR P PRE CONTINUE TO NIPPLE UP BOPE STACK TORQUE ALL CONNECTIONS TO SPECIFICATIONS -NIPPLE UP LOW PRESSURE RISERS -RIG UP HOLE FILL LINES -TIGHTEN TURNBUCKLES -INSTALL BELL NIPPLE AND AIR UP AIR BOOTS -INSTALL MOUSEHOLE 02:30 - 03:30 1.00 BOPSUR P PRE RIG UP TO TEST BOPE -INSTALL TEST JOINT -RIG UP AND PURGE AIR FROM TEST 1 EQUIPMENT -FILL MGS(13 BBLS) -PERFORM SHELL TEST TO 3500 PSI;GOOD TEST -RE-TORQUE ALL CONNECTIONS AFTER SHELL TEST SIMOPS: -BUILD OF 5"PIPE OFF-LINE 03:30 - 12:00 8.50 BOPSUR P PRE - 43 -4300 ;TEST PSI TO 250 PSI LOW/4300 PSI HIGH FOR 5 MINUTES EACH TEST ANNULAR PREVENTER WITH 5"AND 2 17/8"TEST JOINT;250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH -TEST UPPER AND LOWER 2 7/8"x 5"VBRS WITH 5"AND 2 7/8"TEST JOINT -TEST RAM LOCKS ON UPPER AND LOWER VBRS ON FIRST TEST -TEST ALARMS,PVT AND FLOW SHOW INDICATORS -TEST BLIND SHEAR RAMS WITH RAM LOCKS -PERFORM BLACKOUT TEST ON REMOTE PANELS -FUNCTION TEST HIGH PRESSURE BYPASS I-PERFORM ACCUMULATOR DRAW DOWN TEST -4 FAIL/PASS:NC50 FOSV,HT38 DART VALVE, HCR CHOKE VALVE,CHOKE VALVE#11 -AOGCC REPRESENTATIVE JEFF JONES WAIVED WITNESS SIMOPS: -BUILD STANDS OF 5"PIPE OFF-LINE(BUILT 106 STANDS TOTAL FOR WELL AT 12:00) 12:00 - 13:00 1.00 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT -PULLAND BREAK DOWN TEST JOINT AND TEST MANIFOLDS 13:00 - 14:00 1.00 PULL P DECOMP MOBILIZE CASING EQUIPMENT TO RIG FLOOR AND RIG UP -RIG UP POWER TONGS -MAKE UP LANDING JOINT 14:00 - 16:00 2.00 DHB P DECOMP INSTALL DUTCH RISER AND LUBRICATOR TO 'PULL TWC -CLOSE BLIND SHEAR RAMS AND INSTALL DUTCH RISER WITH QUICK TEST SUB -RUN IN LOCK DOWNS ON DUTCH RISER AND CLOSE ANNULAR MAKE UP LUBRICATOR EXTENSIONS AND - 0043 RETRIEVAL TOOL. Printed 4/18/2017 4:32:21 PM *All depths reported in Drillers Depths* • • • North America-ALASKA-BP Page 6 oft Operation Summary Report Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release. Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 16:30 0.50 DHB P DECOMP PRESSURE TEST DUTCH RISER/ LUBRICATOR TO 250/3500 PSI FOR 5 MIN EACH -GOOD TEST 16:30 - 17:30 1.00 DHB P DECOMP PULL AND LAY DOWN TWC -ENGAGE TWC AND VERIFY NO PRESSURE -PULL AND LAY DOWN TWC RIG DOWN LUBRICATOR AND DUTCH RISER 17:30 - 19:30 2.00 PULL P DECOMP PULL AND LAY DOWN TUBING HANGER I-MAKE UP LANDING JOINT TO TUBING HANGER(7 3/4 TURNS) -BACK OUT LOCK DOWN SCREWS ON TUBING HANGER -PICK UP AND PULL TUBING HANGER FREE; HANGER CAME OFF SEAT WITH 140K LBS -PICK UP TO 265K LBS HOOKLOAD AND HOLD.(60%OF TENSILE STRENGHT=231K+ 35K BLOCKS=266K MAX PICK UP) -SLACK OFF AND WORK STRETCH,PICKING UP TO 265K LBS AGAIN. -SLACK OFF TO WORK STRETCH AGAIN AND LOST WEIGHT ON THE DOWN STROKE. PU 160K LBS,SO 115K LBS;STRING WEIGHT INDICATES THAT TUBING PARTED ABOVE THE CUT-11,400' -LAY DOWN TUBING HANGER AND LANDING JOINT -RIG UP CONTROL LINE SPOOLER 19:30 - 23:30 4.00 PULL P ' DECOMP PULL AND LAY DOWN 4 1/2",12.6 LB/FT,L80, MBT TUBING. -LAY DOWN 95 JTS OF TUBING AND 1 SSSV -RECOVERED 43 CLAMPS 23:30 - 00:00 0.50 PULL P DECOMP SERVICE PIPE CAT 3/25/2017 00:00 - 01:30 1.50 PULL N FLUD 13,113.66 DECOMP BRINE OUT OF BALANCE,MAKE UP HEAD PIN AND CIRCULATE SURFACE TO SURFACE VOLUME -BRINE AND DIESEL TRYING TO SWAP THROUGH OPEN POCKET ON FIRST GLM. LAY DOWN GLM WET AND RIG UP HEAD PIN ON TUBING TO DEAL WITH OUT OF BALANCE BRINE IN TUBING -11 BPM;200 PSI -PUMP 20 BBL DRY JOB(9.5 PPG) -MONITOR WELL FOR 10 MIN-STATIC 01 30 - 09:00 7.50 PULL P DECOMP CONTINUE TO PULL AND LAY DOWN 4 1/2", 12.6 LB/FT,L80,MBT TUBING. -LAY DOWN A TOTAL OF 312 JTS OF TUBING, 1 SSSV,2 GLMS AND 1 CUT JT OF TUBING (1.90'OAL) -MONITOR WELL WITH THE TRIP TANK- GOOD DISPLACEMENT. Printed 4/18/2017 4:32.21PM •AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 7 t--46 Operation Summary Report Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:3/20/2017 End Date: 1X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL©67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:30 1.50 BOPSUR P DECOMP PUMP OUT STACK AND FUNCTION RAMS TO CLEAR MISSING BANDS AND DEBRIS FROM BOP CAVITIES -1 BAND IN FLOW BOX -1 BAND FROM BLIND/SHEAR RAM CAVITY -SET 8 7/8"ID WEAR RING AND RUN IN LOCK DOWNS SIMOPS: RIG DOWN DOYON CASING -MOBILIZE CLEAN-OUT BHA COMPONENTS TO RIG FLOOR 10:30 - 12:00 1.50 CLEAN P DECOMP PICKUP AND RUN IN THE HOLE WITH 9 5/8" CLEAN-OUT ASSY,FROM SURFACE TO 419' MD -MONITOR WELL WITH HOLE FILL- GOOD DISPLACEMENT _ 12:00 - 16:30 4.50 CLEAN P DECOMP RUN IN THE HOLE WITH 9 5/8"CLEAN-OUT ASSY,PICKING UP 5"DRILL PIPE SINGLES FROM PIPE SHED -FROM 419'MD TO 3125'MD -FILL PIPE EVERY 2000'MD PU 112K,SO 110KAT 3125'MD MUD WEIGHT IN/OUT 8.5 PPG -MONITOR WELL WITH HOLE FILL- GOOD DISPLACEMENT 16:30 - 20:30 4.00 CLEAN P DECOMP CONTINUE TO RUN IN THE HOLE WITH 9 5/8" CLEAN-OUT ASSY,ON 5"DRILL PIPE STANDS OUT OF THE DERRICK -FROM 3125'MD TO 11,530'MD -FILL PIPE EVERY 2000'MD -PU 112K,SO 110K AT 3125'MD -MUD WEIGHT IN/OUT 8.5 PPG -MONITOR WELL WITH HOLE FILL- GOOD DISPLACEMENT -ENCOUNTERED 20K DRAG AT 11,530'MD; PICK UP AND ATTEMPT TO PUSH THROUGH SEVERAL TIMES 20:30 - 23:30 3.00 CLEAN P DECOMP CLEAN OUT 9 5/8"CASING FROM 11,530'MD TO 12,914'MD -CIRCULATE BOTTOMS UP AT 660 GPM,1350 PSI -SIGNIFICANT AMOUNT OF SCALE,CEMENT AND PARAFFIN AT BOTTOMS UP -MADE AN ATTEMPT TO RUN IN WITHOUT PUMPS AFTER BOTTOMS UP AND ENCOUNTERED 25K DRAG WITHIN 15' WASH AND REAM EACH STAND DOWN -660 GPM,1350 PSI,10 RPM,10-14K FT-LBS TORQUE -PU 238K,SO 148K,ROT 160K SHAKERS LOADED UP WITH CEMENT,SCALE AND PARAFFIN THE ENTIRE TIME WASHING DOWN. 23:30 - 00:00 0.50 CLEAN P DECOMP SERVICE TOP DRIVE,GREASE WASHPIPE AND CHECK FLUIDS Printed 4/18/2017 4.32:21PM `AII depths reported in Drillers Depths* • ,'J / `f ;4.wr`- ,+/'�'`'.�'f4( ry / '// F„ r %i <ii f ii r' fF r/�/'`�'���'�f"f �'' Operation Summary Report /;� F; f/V�'� 'sf',W Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date 3/20/2017 End Date: X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/26/2017 00:00 - 01:00 1.00 CLEAN P DECOMP CONTINUE TO CLEAN OUT 9 5/8"CASING FROM 12,914'MD TO 13,119'MD WASH AND REAM FROM 12,914'MD TO 13,013' MD -660 GPM,1450 PSI,10 RPM,10-14K FT-LBS 1TORQUE -PU 250K,SO 155K,ROT 170K !SHAKERS LOADED UP WITH CEMENT,SCALE AND PARAFFIN THE ENTIRE TIME WASHING DOWN. WASH DOWN WITHOUT ROTATION FROM 13,013'MD TO TOP OF TUBING STUB AT 113,119'MD -TAG TUBING STUB WITH 15K DOWN 660 GPM,1525 PSI 01:00 - 02:30 1.50 CLEAN P DECOMP ,CIRCULATE HOLE CLEAN WITH A SURFACE TO SURFACE VOLUME -PUMP 35 BBL EP MUD LUBE SWEEP 1-890 GPM,2480 PSI,10 RPM 11-13K FT-LBS !TORQUE SIGNIFICANT AMOUNT OF CEMENT,SCALE AND PARAFFIN AT SHAKERS HOLE CLEANED UP 100 BBLS AFTER BOTTOMS UP. -MONITOR WELL FOR 10 MIN-STATIC SPR:13,103'MD MW IN/OUT=8.5 PPG -MP#1:30/40 SPM;60/100 PSI -MP#2:30/40 SPM;56/103 PSI 02:30 - 06:30 4.00 CLEAN P DECOMP PULL OUT OF THE HOLE WITH 9 5/8" CLEAN-OUT ASSY FROM 13,013'MD TO 419' MD MONITOR WELL WITH THE TRIP TANK- GOOD DISPLACEMENT 06:30 - 07:30 1.00 CLEAN P DECOMP LAY DOWN 9 5/8"CLEAN-OUT ASSY FROM 419'MD TO SURFACE -MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH THE STACK STATIC -MONITOR WELL WITH THE TRIP TANK- GOOD DISPLACEMENT 07:30 - 08:30 1.00 CLEAN P DECOMP PERFORM OPERATIONAL ASSURANCE TEST ON 9 5/8"CASING AFTER CLEAN-OUT RUN -250/4000 PSI FOR 5 MIN EACH;GOOD TEST -PUMP 17 BBLS,BLED BACK 17 BBLS 08:30 - 13:00 4.50 WHIP P WEXIT MAKE UP MILLING ASSY AND MWD TOOLS FOR WHIPSTOCK RUN -MOBILIZE MWD TOOLS AND MILLS TO RIG FLOOR -MAKE UP BAKER MWD TOOLS AND SLB MILLING ASSEMBLY -MAKE UP MILLS TO WHIPSTOCK AND SCRIBE TO MWD -PICK UP COLLARS AND RUN IN THE HOLE -MONITOR WELL WITH THE TRIP TANK- GOOD DISPLACEMENT Printed 4/18/2017 4.32.21PM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 9 048 Operation Summary Report Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date' .X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL (467.71 usft(above Mean Sea Level) Date From-To Hrs Task Code ! NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 21:30 8.50 WHIP P WEXIT RUN IN THE HOLE WITH WHIPSTOCK AND MILLING ASSEMBLY ON 5"DRILL PIPE STANDS OUT OF THE DERRICK FROM 779'MD TO 13,119'MD -FILL PIPE EVERY 1000'WITH FILL UP HOSE ON RIG FLOOR -MUD WEIGHT IN/OUT=8.5 PPG PU 250K,SO 163K AT PLANNED WHIPSTOCK SETTING DEPTH 12,953'MD TAG TUBING STUMP AT 13,119'MD WITH 5K -NO SIGNIFICANT DRAG NOTED ON TRIP IN HOLE WITH WHIPSTOCK -PICK UP 166'MD AND MARK PIPE AT PLANNED SETTING DEPTH OF 12,953'MD 21:30 - 22:30 1.00 WHIP P WEXIT ORIENT WHIPSTOCK TO 108°RIGHT OF HIGHSIDE -FILL PIPE AND BRING ON PUMPS TO 550 GPM,1900 PSI QUICKLY TO BYPASS SLB MULTI-CYCLE BYPASS VALVE -WORK TORQUE IN PIPE DOWN TO WHIPSTOCK AND ORIENT WHIPSTOCK TO 108°RIGHT OF HIGHSIDE. 22:30 - 00:00 1.50 WHIP , P WEXIT ATTEMPT TO SET WHIPSTOCK CYCLE PUMPS PER SLB SETTING PROCEDURE TO CLOSE BYPASS VALVE -SHIFT VALVE AT 195 GPM,290 PSI AND PRESSURE UP TO 3500 PSI PER SLB REPRESENTATIVE -SLACK OFF AND PICK UP SEVERAL TIMES IN AN ATTEMPT TO SET WHIPSTOCK -ANCHOR NOT ENGAGING AND ABLE TO GET GOOD CLEAN BREAKOVERS AT 164K DOWN AND 250K UP. -INCREASE PRESSURE TO 4600 PSI AND REPEAT SLACK OFF AND PICK UP PROCEDURE AGAIN WITH NO SUCCESS -BLEED OFF PRESSURE AND REPEAT ENTIRE SETTING PROCEDURE 3 MORE TIMES WITH NO SUCCESS -NOTIFY ODE AND SCHLUMBERGER TOWN _REPRESENTATIVE Printed 4/18/2017 4:32:21PM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP • Page 10 ofy4t Operation Summary Report Common Wet Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/27/2017 00:00 - 02:30 2.50 WHIP N DFAL 12,954.66 WEXIT CONTINUE TO ATTEMPT TO SET WHIPSTOCK -PRESSURE UP T04600 PSI AND ATTEMPT SETTING PROCESS SEVERAL TIMES WITHOUT SUCCESS -ATTEMPT PROCESS SEVERAL TIMES, VARYING FLOW RATE FROM 0.2 BPM TO 8.2 BPM WITHOUT SUCCESS DISCUSS PLAN FORWARD WITH ODE, WSUP,ETLAND SLB REPRESENTATIVE ATTEMPT TO SHIFT SLIPS ON ANCHOR BY APPLYING DIFFERENTIAL PRESSURE ON BACKSIDE AND REPEATING SETTING PROCEDURE WITHOUT SUCCESS: -CLOSE BYPASS VALVE WITH 1000 PSI AND ISOLATE -CLOSE UPPER PIPE RAMS AND INCREASE PRESSURE ON IA TO 3500 PSI FOR 5 MIN -APPEARS THAT BYPASS VALVE OPENED WHEN IA PRESSURE EQUALIZED WITH DP PRESSURE -BLEED OFF PRESSURE AND ATTEMPT SETTING PROCESS AGAIN WITHOUT SUCCESS 02:30 - 08:30 6.00 WHIP N DFAL 12,954.66 WEXIT PULL OUT OF THE HOLE ON ELEVATORS WITH 9 5/8"WHIPSTOCK FROM 12,953'MD AT 90 FPM -MONITOR WELL FOR 10 MIN:STATIC -PU 253K,SO 163K AT 12,953'MD -MONITOR WELL WITH THE TRIP TANK- GOODDISPLACEMENT 08:30 - 10:00 1.50 WHIP N DFAL 12,954.66 WEXIT LAY DOWN WHIPSTOCK BHA FROM 779'MD TO SURFACE -MONITOR WELL FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH THE STACK:STATIC -STAND BACK COLLARS AND HWDP -LAY DOWN WHIPSTOCK PER SLB REPRESENTATIVES -MONITOR WELL WITH THE TRIP TANK- GOOD DISPLACEMENT 10:00 - 11:00 1.00 CASING C WEXIT PERFORM MIT ON 9 5/8"CASING PER OCN#1 FROM ODE AND WSUP -RIG UP TO PRESSURE TEST -CLOSE BLIND/SHEAR RAMS AND PURGE AIR OUT OF SYSTEM -PERFORM MIT ON 9 5/8"CASING;250/4000 FOR 5/30 MIN:GOOD TEST -RECEIVE ATP FROM WSUP. -SEE ATTACHED TEST CHART 11:00 - 12:00 1.00 WHIP N DFAL 12,954.66 WEXIT ATTEMPT TO DIAGNOSE WHIPSTOCK I SETTING FAILURE NO OBVIOUS VISUAL DEFICIENCIES -TOOL WILL NEED TO BE TORN DOWN AND INSPECTED -SHALLOW HOLE TEST MWD TOOLS:GOOD TEST -PREP RIG FLOOR FOR NEXT WHIPSTOCK BHA Printed 4/18/2017 4.32.21PM `AII depths reported in Drillers Depths* Common Well Name:NK-14 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71usft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 WHIP N DFAL 12,954.66 T WEXIT MAKE UP MILLING ASSY WHIPSTOCK TO MWD TOOLS -MAKE UP BAKER MWD TOOLS AND SLB MILLING ASSEMBLY MAKE SHER BUPOLT ANDMILLS SCRIBETO TOWHIPSTOCK MWDWITH 55K PICKUP COLLARS AND O MONITOR WELL WITH THERUN TRIPIN TANK- THEHLE GOOD DISPLACEMENT 14.30 - 21:30 7.00 I WHIP N DFAL 12,954.66 WEXIT RUN W MILLINGINTHE ASSEMBLYHOLEWITH ON 5"DRILL PIPEHIPSTOCKAND STANDS OUT OF THE DERRICK FROM 779'MD I TO 13,119'MD I-FILL PIPE EVERY 1000'WITH FILL UP HOSE ION RIG FLOOR ! -MUD WEIGHT IN/OUT=8.5 PPG PE 255K,SO 163KAT PLANNED WHIPSTOCK SETTING DEPTH 12,953'MD -TAG TUBING STUMP AT 13,119'MD WITH 5K -NO SIGNIFICANT DRAG NOTED ON TRIP IN HOLE WITH WHIPSTOCK -PICKUP 166'MD AND MARK PIPE AT PLANNED SETTING DEPTH OF 12,953'MD 21:30 - 22:00 0.50 WHIP N DFAL 12,954.66 T WEXIT ORIENT WHIPSTOCK TO 108°RIGHT OF HIGHSIDE RO GPM,FILL 1900PIPE AND PSI QUICKLYBINGON TO BYPASSPUMPSTSLB550 MULTI-CYCLE BYPASS VALVE : 1 : WORK TORQUE IN PIPE DOWN TO WHIPSTOCK AND ORIENT WHIPSTOCK TO 108°RIGHT OF HIGHSIDE 122.00 - 22:30 0.50 I WHIP N DFAL 12,954.66 WEXIT I SET WHIPSTOCK AT 12,953'MD(BOTTOM OF WHIPSTOCK) -CYCLE PUMPS PER SLB SETTING PROCEDURE CLOSE Y -SHIFTVALVEATTO174GPMB,261PASS PSI ANDVALVE PRESSURE UP TO 3500 PSI PER SLB REPRESENTATIVE SLACK GOOD INDICATIONOFFANDSET OF WHIPSTOCKDOWN5K; SETOBSERVE -PICK UP TO 270K,10K OVER -PER SLB SETTING PROCEDURE,SET DOWN AND PICK UP IN 10K INCREMENTS TO SET WHIPSTOCK AND SHEAR MILLS FROM SLIDE. -OBSERVE SHEAR BOLT SHEAR WITH 41K DOWN -PICK UP ABOVE SLIDE,OBSERVE PRESSURE DROP AS HYDRAULIC HOSE RUPTURED. -ESTABLISH BASELINE PARAMETERS;190 GPM,1957 PSI,80 RPM,12K FT-LBS TORQUE -ROTATE MILLS WITH 80 RPM AND LIGHTLY ENGAGE WHIPSTOCK SLIDE -OBSERVE PRESSURE DROP AS MILLS ENGAGED SLIDE;GOOD INDICATION THAT BREAKAWAY NOZZLE PLUGS ON LEAD MILL HAVE BEEN CLEARED. -PICK UP AND ESTABLISH FLOW RATES FOR DISPLACEMENT -300 GPM,1000 PSI;550 GPM,2840 PSI;650 GPM,4000 PSI Printed 4/18/2017 4:32:21 PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 12°DA Operation Summary Report Common Well Name:NK-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/20/2017 End Date: X3-0183C-C:(7,313,635.00) Project:Niakuk Site:NK Main Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/22/1996 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI: Active datum:NK-14B ACTUAL @67.71 usft(above Mean Sea Level) Date From To Hrs Task Code NPT NPT Depth j Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 DISPL P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.3 PPG LSND MILLING FLUID -620 GPM,3520 PSI -PUMP 43 BBL EP MUD LUBE PILL SIMOPS: -BUILD STANDS OF 4"DRILL PIPE FOR INTERMEDIATE SECTION OFFLINE. 3/28/2017 00:00 - 00:30 0.50 DISPL P WEXIT CONTINUE TO DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.3 PPG LSND MILLING FLUID -620 GPM,3520 PSI -PUMP 43 BBL EP MUD LUBE PILL SPR:12925'MD(7059'TVD) -MW IN/OUT=9.3 PPG -MP#1:30/40 SPM;475/602 PSI -MP#2:30/40 SPM;485/605 PSI SIMOPS: -BUILD STANDS OF 4"DRILL PIPE FOR INTERMEDIATE SECTION OFFLINE 00:30 - 01:00 0.50 STWHIP P WEXIT SERVICE RIG FLOOR EQUIPMENT • 01:00 - 12:00 11.00 STWHIP P WEXIT MILL WINDOWAND 43'OF RATHOLE PER SLB SlikFISHING REPRESENTATIVE FROM 12928'TO 12978'MD AN.-145 -350 GPM,1545 PSI,60-100 RPM,10-13 KFT-LBS TORQUE OFF BOTTOM,22 KFT-LBS TORQUE ON BOTTOM -INITIATE MILLING WITH 0.5 KLBS WOB,AND GRADUALLY INCREASE TO 10 KLBS WOB PER SLB FISHING REP -STOP MILLING AT 12955'MD AND CHECK WINDOW WITH PUMPS AND ROTATION,NO DRAG OR OTHER ISSUES OBSERVED WHILE DRIFTING WINDOW -DRILL ADDITIONAL 23'OF FORMATION TO 12978'MD TO PROVIDE SUFFICIENT RATHOLE FOR 8-1/2"DRILLING BHA -PU= 245 KLBS,SO=165 KLBS,ROT= 187KLBS TOP OF WINDOWAT 12928'MD BOTTOM OF WINDOWAT 12942'MD 12:00 - 13:30 1.50 STWHIP P WEXIT CIRCULATE BOTTOMS UP TO CONDITION AND CONFIRM CONSISTENT MUD WEIGHT ALL THE WAY AROUND BEFORE LEAK OFF TEST ;-450 GPM,2170 PSI -NO ROTATION -RECIPROCATE 35'DURING CIRCULATION -MUD WEIGHT IN/OUT=9.3 PPG Printed 4/18/2017 4.32.21PM *AII depths reported in Drillers Depths* TREE= 4"CAN VVELLHEAD= 1 1 Al • N K-1 4A NOTES:WELL REQUIRES A SSSV*** _ACTUATOR= -w BAKER (SUSPENDED 05/04/07) OKB.ELEV= 59.8' I I BF.ELEV= 24.03' KOP= 18216' _"CONDUCTOR, ? Max AngIe_= 103"@ 19352' #, , Za 12928' —�VVHPST(X F( 03/27/17 Datum MD=_ 1_8224' p= ( ) Datum TVD= 9200 SS GAS LFTM4NDRELS 13-3/8"CSG,68#,L-80 BTC,ID=12.415" H 641T ST MD IVU DEV TYPE VLV LATCH PORT DATE 4 4004 3503 55 OTIS TB EMPTY - 02/04/17 4-1/2"JET CUT TBG(02/28/17) —{ 13112' 3 11059 6369 64 OTIS TB EMPTY - 02/04/17 2 15276 7987 67 OTIS TB EMPTY - - 02/04/17 EST TOC PLUG(02114/17) H -16642' *1 17842 8994 68 OTIS TB EMPTY - -• 02/04/17 .+'. *STA#1=BEHIND CEMENT PLUG Minimum ID =3.00" 2120' 17913' —14-1/2"NP,HES x,D=3.813" 4-1/2" ANCHORED HO SLEEVE `.4`. k4n I 17925' 9-5/8"X 4-1/2"TIW HBBP PKR, W/ANCHOR LATCH,D=3.916" pill 17949' H 4-1/2"HES'X'PYP,D=3.813" ii TOP OF 7"LNR H 17962' • . 17962' _9-5/8"X 7"TIEBK,BKR LTP le #.#1 &FLEXLOCK LNR HGR, =6.313" *}; , D 17969' H4-1/2"FES XN NP,MLLED TO 3.80"(XX/XX/XX) 4-1/2"TBG,12.6#,L-80 BT-M,.0152 bpf,D=3.958" H 17980' ''i.1,4 17982' H4-1/2"WLEG,ID=3.958" .+ . k. •.4, 17980' —I ELMD TT-LOGGED 10/06/97 J 9-5/8"CSG,47#,L-80 BTC-M,13=8.681" H 18121' 1w• ••*•.4%,• .. MLLOUT WINDOW(NK-14B) 18219'-18226' BKR CEMENT RETAINER(04/29/07) — 18170'CTM . EST TOP OF CEMENT(04/30/07) H 18089' ELMD .:7 4-1/8'OPEN HOLE LATERAL MAN HOLE —I 19660' i 7"MECHANICAL WHIPSTOCK —f ! '1►, • Y•• w/PIP TAG @ 18226' .. 7"FAZED MECHANICAL WI-PSTOCK -I 18240` w/RA PIP TAG @ 18250' •, 21kPERFORATION SUNMARy 4 EROPEN HOLE S/T 19150' REF LOG:FMT/GR ON 45/22/96 �*. ,� ANGLE AT TOP PERF:63° @ 18220' • .4 Note:Refer to Production DB for historical perf data * 4-1/8"OPEN HOLE LATERAL PLUGBACK#1 20541' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 11 ."4::'' 2-7/8" 6 18220-18240 S 04/18/064`r 4-1/2" 5 18256-18276 S 04/18/06 4-1/2" 5 18284-18418 S 04/18/06 AI 18612' 1 FISH-2 ROLLERS AND 2 ALLEN SCREWS ' ' OFF ROLLER STEM 8/13/96 I. PBTD - 18615' "5 , r*# # ' 7"LW,29#,L-80 BTC-M,.0371 bpf,D=6.184" —I 18700' . '* • DATE REV BY COMM NTS DATE REV BY C 0I E NTS NIAKUK UNIT 06/08/96 POOL 7 IMTIAL COMPLETION 02/15/17 TFA/JMD CEMENT PLUG(02/14/17) WELL: NK-14A 05/04/06 NORDIC I CTD SDTRACK(NK-14B SUSP) 03/01/17 NXW/JMC JET CUT TBG(02/28/17) PERMIT Pb:'2060310 04/30/07 GLM+PJC P&A 03/01/17 JT/JMD ADDED CMT API No: 50-029-22668-01 07/08/14 PJC CSG/TBG/LINER/GLV UPDATES 03/06/17 JMG/JMD SET ANCHORED HO SLEEVE(03/04/17) Sec_36,T12N,R15E,1358'FSL&944'FEL 07/09/14 PJC LEGEND UPDATE 04/25/17 JNL/JMD PILLED TBG&SET Wl-FSTOC K 02/08/17 MAIM,GLV C/O(02/04/17) BP Exploration(Alaska) • • ♦.of Tit y ,\11/ .A THE STATE Alaska Oil and Gas o e T e c T e Conservation Commission fALAS tt } = 333 West Seventh Avenue ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OF ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Ken Allen Drilling Supervisor �oo SCA BP Exploration(Alaska), Inc. S P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field,Niakuk Oil Pool, PBU NK-.14A- Permit to Drill Number: 206-031 Sundry Number: 317-021 Dear Mr. Allen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /91-1444-- Cathi P. Foerster Chair DATED this� day of January, 2017. RDDM@S - 3 2017 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI APPLICATION FOR SUNDRY APPROVA S 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0, Perforate New Pool 0 Re-enter Susp Well ® - Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: A1,r?I /•1 5. Permit to Drill Number: 206-031 3, Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development 99519-6612 Stratigraphic ❑ Service 16• API Number: 50-029-22668-01-00 7. If perforating: 8. Well Name and Nu r:____ What Regulation or Conservation Order governs well spacing in this pool? l3 Will planned perforations require a spacing exception? Yes 0 No PBU NK-14A 9. Property Designation(Lease Number): 10. Field/Pools: Alta-k; ,I(, i./ 'i7 JAN 1 201 ADL 034630&034625• PRUDHOE BAY,R OIL PTs //Zs[17 11. PRESENT WELL CONDITION SUMMA AOGCC Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): Junk(MD): 19660 • 9072 - 18089 9090 3578 18089(TOC),18170 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 41 -121 41 -121 1530 520 Surface 6377 13-3/8" 40-6417 40-4518 5020 2260 Intermediate 18083 9-5/8" 38-18121 38-9103 6870 4760 Production Liner 257 7" 17962-18219 9039-9144 I 8160 7020 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None 4-1/2"12.6# L-80 36-17982 Packers and SSSV Type: 4-1/2"TIW HBBP Packer Packers and SSSV MD(ft)and ND(ft): 17925/9025 4.5 HES Series 10 SSSV 2120/2112 12.Attachments: Proposal Summary RI Wellbore Schematic I21 13.Well Class after proposed work: ` I ,t'1 Detailed Operations Program 0 BOP Sketch ® Exploratory 0 Stratigraphic 0 Development.* )Service l �'� 1.l>t,l'� 14.Estimated Date for Commencing Operations: January 23,2017 15. Well Status after proposed work: / Oil 0 WINJ 0 WDSPL 0 Suspended RI 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Thompson,Jacob be deviated from without prior written approval. Email Jacob.Thompson@BP.com Printed Name Ken Allen � a„Tow rrt Au-SJ Title Drilling Supervisor • Signature priPi;TPhone +1 907 564 4366 Date ��/�/ COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number •3l7 — O2l Plug Integrity 0 BOP Test eMechanical Integrity Test 0 Location Clearance 0 Other: l3 op ILC S 7 l f U i_ pU o (7,j-t cl I '1-S 111 4-,f7r7v1ar nrzvCr/1fir fc-- !" 'fa ZSR t Post Initial Injection MIT Req'd? Yes 0 No EV- Spacing Spacing Exception Required? Yes 0 No 172 Subsequent Form Required: /1 — 4 0 /Witi Approved by6 COMMISSIONER COMMISSION Date:/-• --/7 1031.4.44,......_ V7-1— i/24 `1 ,, APPROVED BYTHE ORIGINAL RSDS (. FED - 32017 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate by • NK-14A Sundry Application Well Type: Producer Current Status: The well is currently suspended. Request: Approval is requested for the P&A of Prudhoe Bay well NK-14A to sidetrack and complete NK-14B CMIT-T x IA Passed to 4000 psi (10/11/2015) MIT-OA Passed to 1200 psi(10/12/15) PPPOT-T Passed to 5000 psi (10/06/2015) PPPOT-IC Passed to 3500 psi (10/06/2015) Well History: NK-14 was drilled and completed in 1996 as a Kuparuk Slant well. The well has suffered from low t w a l productivity and high WC's. While drilling NK-14A two coil tubing sidetracks were drilled in 2006, and alr { wer . The two coil laterals were abandoned by placing a cemen re vrti I (c'°} )41 production liner and`squeezing •••Is of cement below a re aine, an• p acing •• s o cemen 5J5�( ? above the retainer. On 04/30/2007 the well has been classified as suspended. fe kr 1/4 Scope of Work: N° Ofr The sidetrack plan for the NK-14B well includes the following operations. Pre-rig, A plug will be set in an X-nipple at 17,949' MD. A D&D hole finder run will be conducted on slick line to determine the severity and location of the T x IA communication. A tubing punch will run to establish communication above the 4-1/2" x 9-5/8" production packer at 17,925' MD. A cement plug will be circulated into the tubing and IA, which will bring the top of cement to—16,825 MD. Once the cement has setup, the final top of cement will be determined with a drift run followed by an integrity test of the tubing and inner annulus. Next, the 4-1/2" tubing will be jet cut at —13,100' MD. The rig will then move over the well and pull the 4-1/2"tubing and set a whipstock exit—13,000' MD. MASP: 3,578 psi (assuming 9.5 ppg Kupark at 9081' TVDss) Estimated Start Date: January 16th, 2017 Drilling Engineer: Jacob Thompson (907) 564-5579 Production Engineer: Kirsty Schultz (907) 564-5105 Geologist: Rory San Filippo (907)564-4403 NK-14A Sundry 1 1/12/2017 • • Loepp, Victoria T (DOA) From: Thompson,Jacob <Jacob.Thompson@BP.com> Sent: Tuesday,January 24,2017 11:01 AM To: Loepp,Victoria T(DOA) Subject: RE: PBU NK-14A(PTD 206-031, Sundry 317-021) Plug for Redrill Attachments: NK-14B WP10.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, A cement retainer was placed at 18,170' MD. 6 bbls of cement were squeezed thru the retainer, and 4 bbls dumped on top of it. Later the cement/retainer was pressure tested to 3,000 psi on May 7th 2007.The top of cement was confirmed by tagging it with eline at 18,089' MD on May 11th 2007. As far about the window exit it appears that whoever made the original NK-14A schematic named the deeper window in correctly.The window depth for NK-14B can be found in the attached schematic. Let me know if you need any more information. Thanks, Jacob Thompson BP Alaska Rotary Drilling Engineer Cell:(907)854-4377 Office:(907)564-5579 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday,January 24, 2017 8:58 AM To:Thompson, Jacob Subject: PBU NK-14A(PTD 206-031, Sundry 317-021) Plug for Redrill Jacob, Was the cement plug with TOC at 18170'CTM pressure tested? NK-14A has been plugged since 5/2007,correct?What is the "millout window(NK-14B) 18219' MD"on the schematic when the whipstock is at 13000' MD? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp[a�alaska.gov 1 • • Pre-Rig Prep Work: Step Service Line Description of Work 1 S Set tubing tail plug in X-nipple at 17,949' MD 2 S D&D hole finder,punch tubing 3 S D&T TOC. Drift for Tubing Punch, MTT log w/GR/CCL. 4 E Tubing Punch at—17,925'MD above production packer. 5 F Circulate Cement Plug into TBG&IA with 68.6 bbls of 15.8 Class G.TOC—16,925'(length—1,000'MD) 6 S D&T TOC. Drift for Jet Cut 7 F A/SL:CMIT-TxIA 4000 psi. 8 E Jet Cut TBG—13,100'MD. Planned KOP is—13,000' MD. 9 F A/SL: CMIT-TxIA 4000 psi. 10 V Install Dry Hole Tree. Install Annulus Valves. Set TWC. Proposed Drilling Rig Operations: 1. MIRU Parker 272. 2. Test TWC from below to 4,000 psi for 5 minutes. 3. Nipple down tree. Nipple up and test BOPE to 4,000 psi. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection through choke to tiger tank with clean 8.5 ppg seawater. 6. RU and pull the 4-1/2"tubing from the pre-rig jet cut. 7. PU 9-5/8"whipstock and 8-1/2"window milling assembly. Orient and set the whipstock. 8. Swap the well over to 9.2 ppg fresh water LSND milling fluid. End of Sundry: Start of Permit to Drill 9. Mill window in the 9-5/8"casing plus 20'of formation. 10. Perform LOT. POH for drilling BHA. 11. MU 8-1/2"drilling BHA, GR/RES/PWD, UBHO (Gyro), and RIH. Kick off and drill 8-1/2" intermediate interval. 12. Drill until MWD obtains clean surveys at 13,600' MD. 13. Take Gyro single shots while CBU. 14. Drill 8-1/2" intermediate interval to section TD in TSAG at—17,358' MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • KOP—7,423'TVDss: 9.3-9.5 ppg • 7,423'TVDss—TD: 10.3- 11 ppg 15. At TSGR, CBU or until hole is clean, then perform short trip to the ghost reamer depth. 16. RIH to TD and circulate the well clean and POH on elevators. 17. Change upper VBR pipe rams to 7"casing rams and test to 250 psi low/3,500 psi high. 18. Run 7", 26#, L-80, VAM TOP liner to TD and cement. Top of cement will be at—15,000 MD or 1,500' MD above the top of the Kuparuk. 19. Change upper 7"casing rams to 2-7/8"x 5-1/2"VBR pipe rams and test to 250 psi low/4,000 psi minutes high. 20. Pressure test the 7"casing to 250 psi low/4,000 psi high for 5 minutes low/30 minutes NK-14A Sundry 2 1/12/2017 • • 21. MU 6-W drilling GR/RES/NEU/DEN/Pressure samples. 22. Displace the well to 9.8 ppg Flo-Pro fluid prior to fully drilling out shoe track. 23. Drill 20'of new formation and perform a FIT. 24. Drill 6-1/8" hole to TD at 21,118 MD. • Take pressure samples in the Sag River and Ivishak to obtain fluid gradient to understand fluid composition. 25. Circulate bottom ups and condition the hole as necessary. 26. Perform short trip to the 7"shoe. 27. RIH to TD and circulate/condition the hole as necessary until shakers clean up. POOH on elevators and LD 6-1/8"drilling BHA. 28. MU and run 4-W 12.6# 13CR Vamtop to TD. Cement in place. 29. Set liner hanger and liner top packer. Pull liner running tool above liner top. Displace well to 8.5 ppg seawater. 30. POH, L/D the liner running tool. 31. R/U and run a 4-W, 12.6#, 13CR, VT tubing completion with GLM's. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 32. Make up tubing hanger. Land the tubing hanger, and run in lock down screws. 33. Reverse circulate 8.5 ppg brine and corrosion inhibitor into the tubing x casing annulus. 34. Drop ball/rod and set packer and individually test the tubing and annulus to 4,000 psi for 30 minutes. Record each test. 35. Bleed tubing pressure to 2,500 psi. Pressure test the IA to 250 psi low/4,000 psi high for 5 minutes low/5 minutes high. 36. Hold pressure on the IA and bleed tubing pressure to zero, shearing the DCR shear valve. Pump both ways to confirm circulation ability. 37. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 38. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 39. Install TWC and test from above to 250 psi low/4,000 psi high for 5 minutes each and from below to 250 psi low/4,000 psi high for 5 minutes low/30 minutes high. 40. Nipple down the BOPE. Nipple up the adaptor flange and double master valves and test to 5,000 psi with diesel. 41. Ensure Heet®is left on top of the TWC and only diesel (no water) is left in the tree. 42. Install all annulus valves and secure the well. Ensure T/IA/OA all have two barriers in place. 43. RDMO. Planned Post-Riq Operations: 1. Pull ball and rod, shear valve, and dummies, install GLVs. 2. Install and test production tree 250 psi low/5,000 high. 3. RIH and perforate well with well work platform. 4. Flowback as per ASRC. 5. Install flow lines and well house. NK-14A Sundry 3 1/12/2017 yyaLl � FMC 13_� • N K-1 4A SA NOTES:WELL REQUIRES A SSSV"' UNIVERSAL P'V " (SUSPENDED 05/04/07) — -- ACTUATOR= BAKER OKB.ELEV= 59.8' I I I BF ELEV= 24.03' KOP 18216' _"CONDUCTOR Max Angle= 103°@ 19352' _#, 2120' 4-1/2"HES SERES 10 TRSSSV D=3.813" i Datum MD= 18224' D= - Datum ND= 9200'SS GAS LFT MANDRELS 13-3/8"CSG,68#,L-80 BTC,D=12.415 — 6417' ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3503 55 OTIS TB DMY RM 0 03/26/06 3 11059 6369 64 OTIS TB DMY RM 0 03/26/06 Minimum ID =3.80" @ 17969' I 2 15276 7987 67 OTIS TB DMY 12 0 04/02/02 4-1/2" HES 'XN' NIPPLE 1 -17842 8994 68 OTIS TB DMY RA 0 06/02/96 ' ' 17913' H4-1/2"NP,FES X,D=3.813" 17925' 19-5/8"X 4-1/2"TM,HBBP PKR, W/ANCHOR LATCH,D=3.916' I ' 17949' H4-1/2"FES'X'NP,D=3.813" TOP OF 7"LM H 17962' 17962' J9-5/8'X 7"TEBK,BKR LTP &FLEXLOCK LNR HGR,D=6.313" ' M 17969' H4-1/2"FES XN NP,M LLED TO 3.80"(XX/X)(/X() 4-1/2"TBG, 12.6#,L-80 ET--M,.0152 bpf,D=3.958' -J 17980' 17982' H4-1/2"WLEG,D=3.958" 17980' —•I ELMD TT-LOGGED 10/06/97 9-5/8"CSG,47#,L-80 BTC-M,D=8.681" — 18121' Mt LOUT WNDOW(NK-14B) 18219'-18226' BKR CETNEINT RETANER(04/29/07) — 18170'CTM .7t74ry:;;•e- �1T *• .,• 41/8"OPEN HOLE LATERAL MAN HOLE H19660' [EST TOP OF CEBAEtYT(04/30/07) 1-[18089' EL *.4%.4.." —1-1' N. tw'. T"MECHANICAL WHPSTOCK 1-1' 18215' --4.. 8 iv/PIP TAG S 18226' +,PI�I`i/ti� I` I'Y,I,I*IBJ 1000101.• 7"FALED MECHANICAL WHPSTOCK --{ 18240' ��� } • w/RA PIP TAG 18250' I�#4 II PERFORATION SUMMARY Ni �II1., OPEN HOLE S/T 19150' }.�.y y. REF LOG:FMTtGR ON 05/22/96 •''t 4.s , ANGLE AT TOP R32F:63° @ 18220' ':C``►*`s. v 4r4-1.1•}.. ! 4-1/8"OPEN HOLE LATERAL FLl1GBACK#1 —{ 20541' Note:Refer to Production DB for historical pert data +.a.t. ! k.�.a SIZE SPF INTERVAL Opn/Sqz SHOT SQZ •..+,w,s'!t 2-7/8" 6 18220-18240 S 04/18/06 4-1/2" 5 18256-18276 S 04/18/06 y *}.}•} 4-1/2" 5 18284 18418 S 04/18/06th ~;.., --� 18612' HFISH-2 ROLLERS AND 2 ALLEN SCREWS orOFF ROLLER STEM 8/13/96 • %"•"4 "'.1. PBTD H ~.*4**)A 18615' w?�.;4..k.�.' ..}. }.... 7"LNR,29#,L-80 BTC-M,.0371 bpf,D=6.184" — 18700' Z-'-•--'tM«.i'k DATE REV BY COM—VENTS DATE REV BY COM/ENT S NIAKUKUNT 06/08/96 POOL 7 IMTIAL COMPLETION 03/23/14 PJC DRAWING CORRECTIONS WELL: NC-14A 05104/06 NORDIC 1 CTD SDTRACK(NK-14B SUSP) 04/21/14 KP/JMD CHANGED SUSFEN)ED DATE PERMIT No:"2060310 04/30/07 GLM/PJC P&A 07/08/14 PJC CSG/TBG/LI"U/GLV UPDATES AR No: 50-029-22668-01 06/21/07 CS/PJC CEP PULLED(4/28/07) 07/09/14 PJC LEGEND UPDATE Sec.36,T12N,R15E,1358'FSL&944'FEL 02/18/11 MB/JMD ADDED SSSV SAFETY NOTE 01/27/14 GJF/PJC SSSV CORRECTION BP Exploration(Alaska) I F4 4"CNV N IK 1 1NiT3Li EATS= FMC 13 518" 1111 - S NOTES:WELL REQUIRES A SSSV"' ACTUATOR= t1tvV> LR (SUSPENDED 05/04/07) OK6.ELEV= 59.8' BF HEV= 2403' 11)] KOP= 18216' _'OOfLDucTORH ? 1 Max Angle = 143"@ 19357 #, Q 2120' H4-112""Hr Sff2ES 10 TRSSSV,D=3.813" , Datum M)= 18224' p= - w F r«F�1ns Datum ND= 9200'SS 1. GAS LIF T MANDRELS 13-3/8"CSG,68#,L-80 BTC.D=12.415' ,H 6417' ST M) NDEV DTYPE VLV LATCH FORT DATE) A� 4 4004 3503 55 O11S TB CMV PM 0 03126/06 4-112'JET CUT — 1$000" 3 11059 6369 64 OTISTB DMY MI 0 03l26/Oi 2 15276 7987 , 67 011S TB DMV 12 0 04/02/02 TOP OF CEMENT 4-1/2'X 9-5/8' H 17425' i 1 17842 8994 68 OM TB DMV PA 0 06/02/96) 1 TOP OF CEJvi£1VT 9-5/$"X 1271-ii:Th 17770' 17913' —14-1/2"NP, X,D=3.813' TUBING PUNCH H 17924' ": �` ' 17925' --+9-5/8'X 4-1/2'1M/HBBP PKR, 1 II ,. VWANCHOR LATCH,D 3.916" 5 4-1/2"TUBING TAL PLUG H 17949' � ► 7. 17949' H4-112"I-ES'X'NIP,ID=3.813' TOP OF r LINFt 17962' 7 — iw w 1962" 9-5/8"X r 1KLWBKR L , &FLExLOCkt L.NFt HGf2,!.3=6.313" Minimum = ID 3.80" @ 17969' ; 4-112" HES `XN` NIPPLE 17969' H4-112•HES XN NP,MILLED 3.80"(xx/xx/xx) , 1 141-712-7—TBG,12.6#,L-80 ST--M,.0152 bpf,ID=3.958" H 17980' L. . 17982' H4-la-WLEG,D=3.958' ' 17980' E M0 TT-LOGGED 10!08/97 ' + 1 1 9-5/8'CSG,47#,1-80 BTC-M,!0=8.681" f— 18121" , 1 MLLOUT WN04W(NK-14) 18219'-18226' / ' 9 TOP OF CEMENT 7"X 8-1/2"OH —1 18150' BKR CEMENT TT RETAINER(04/29/07) H18170'CTM �/���U, ` r�� ila 4-1/8"OPEN}TOLE LATERAL MAN HOLE 196604 EST TOP OF CEMENT(04/30/07) 18089'ELMO (. *:+r,w I 4,14•4'4,# • rye -4, - 1ioNS Py s ►jA,�► \44 � - '--- " « 4i 404 4.4 ANGLE AT TOP PERF:63° §18220' 4' �+ Note:Refer to Aoduction DB for historical perf data ,r . - ,f SIZE SPF NTB VAL Opn/Sgz SHOT SQZ N.- •".6..,.4- ,,,,,N.0, 4-1/8"OPIN HOLE LATERAL PLUGBACK#1 206414 2-7/8" 6 18220-18240 S 04/18/06 .Y**1.4. 4-1/2" 5 18256-18276 S 04/18/06 'ti'•.''''+y 41/25 18284 18418 S Od/18/06` -•'y +�+ 18612' —FISH-2ROLL tSAND2ALLL3i5CREWS e OFF ROLLER STEM 8/13/96 *.4', 4- *. #44 w4- PBTD 18615' _ :'1.• 7"LNR,29#,L-80 BTC-M,.0371 bpf,D=6.184" H 18700• DATE REV BY COMMENTS DATE 'REV BY' COMMENTS AIAKUK UNIT 06/08/961 POOL 7 INTIAL COMPLETION 03/23/14 PJC DRAWING CORRECTIONS WELL: NK-14A 05/04/06 NOMIC 1 CTD SDTRACK(M(-148 SUSP) 04/21/14 KPJM) CHANGED NGtD SUSPE3"DE D DATE PERMIT No:'2060310 04/30/07 GLM/PJC P&A 07/08/14 PJC CSG/TBG/LNC/GLV UFUATES AA No: 50-029-22668-01 06/21/07 CS/PJC CEP PULLED(4/28/07) 07/09/14 PJC LEGEND UPDATE Sec.36,T12N,R15E,1358'FSL&944'FEL 02/18/11 1113/JMD ADDEDSSSV SAFETY NDTE '01/27/14 GJF/PIC SSSV CX)E3RECTXIN �� BP Exploration(Alaska) WEE= 4"CW FMC 13-5/8' ONK-14B Proposed S.Y NOTES:WELL REQUIRES A SSSV**• WEILHEAT, INV Ef2SAL ACTLINTOR= BAKER OKB.ELEV= 59.8' BF ELEV= 24.03' jj L 1 L KOP=, _.-CONDUCTOR, --I ? ..1--14-1/2"HES X NIP, ID=3 813" 1 Max Angle= I Datum MD= 18224' ID= • D3 turn TVD= 9200'SS 13-3/8'CSG,68#,L-80 BTC,ID=12.415' --I, 641T 1 GAS LFT IVAMDFELS ST MD TVD DEV TY'FE VLV LATCH PORT CATE 6 5096 4000 Minimum ID = 3.725" @ 17098 5 10129 6000 '4-1/2" HES 'XN' NIPPLE 4 12706 7001 3 14318 7750 2 15412 8374 1 16240] 9000 12850' I—I9-5/8'X 7"LH<P,ID= " 1,9-5/8"ME-CHA MCA L WAIFSTOCK( / / ) HI_ 13000' ,I 9-5/ , , FLOUT WNDOW(NK-148) -13000'-13010'8'CSG,47#,L-60 BTC-M.E)=8.681' I— -13000' I L000j—t_4_yr t- x t4P,ID=3.813' I i L 17088' j---11.-Ii2"HES X NP,ID=3.813' 17090' _ kir' ..7. .____ _ 1 L 17098' '-14-1/7 HES xN KIP,ID=3.725' 4 ii 17190' _I—4-1/2'WLEG,13=3.958' I [4-1/2"TBG, 126#, 13Cr-80 VAMTOP 13=3958' j—{ 17190' I 17200' —5'X 7'WFT LTP&HGR w fTEBACK SLV, 13= r LNR,26* I 80 VAMTOP VIC, 0383 bpi,ID-6.276" JH 17358._ 1 FERFORAI1ON&WARY • RET LOG FMT/GR ON 05/22/96 a Note:Refer to Produclion DB for historical perf data SIZE SPF NTERVAL Opn/Sqz SHOT SQZ ii It 4-1/2'TBG, 12,6#,13CR-80 VAMTOP ID=3.958' H 21118' A & LATE REV BY COMETITS ' DA TE REV BY COMM3sITS MA KUK Ulf 06/08/96 POOL 7 IMT1AL COMPLETION 03/23/14 PJC DRAWING CORRECTIONS WELL. ti(-14B 05/04/064.4DRDIC 1 CTD SCITRACK(NK-1413 SUSP) 04/21/14 KP/JM) CHARGED SUSPaNDED IIATE PERMT No: 04/30/07 GLM/PJE P&A 07/08/14 PJC CSG/MG,L8•411/GLV LFDA i E.S AR Pb: 50-029-22668-02 06/21/07 CS1PJC CEP PU.,LED(4/28/07) 07/09/14 PJC LEGEND URATE Sec.36,T12N,R15E,1358'FSL&944'FE. 02/18/11 M3/14) ADDED SSSV SAP-hi Y NOTE 11/23/15 PT UPDA 11=1.)TO NK-148 01/27/14 GJF/PJC SSSV CORRECT1ON BP Exploration(Alaska) • • 111 hl 1 t ; ;ti 5 s a i =gin i a� s i!! . !' �A=3g & 'te a, ' o,,2 i- —�-- Q f__ 1M^^ ' int : ,44 .:, 2,2^n \ td 252 0„ i X32 �22 5a. ` ! !U! W Jnr n., S^- St.:'..: 8� j "1:1 t i , iM' -i- ,------- -— H .( P' • n4 i PNAMP!1 tea! t OP. .:cil 40Aml---1 S IT fit 9} qa -a e5 3 II i *141;:102_ gg 633 V ffi 11001 i S. g `� °�Fi3 9aF 8 ggrzg mw 3Cin).'a gena sn1— 7+,1 :`,k o 6 o hen vowel • I Loepp, Victoria T (DOA) From: Thompson,Jacob <Jacob.Thompson@BP.com> Sent: Tuesday,January 24, 2017 11:01 AM To: Loepp,Victoria T(DOA) Subject: RE: PBU NK-14A(PTD 206-031, Sundry 317-021) Plug for Redrill Attachments: NK-14B WP10.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, A cement retainer waslaced at 18 170 MD. 6 bbls of cement were squeezed thru the retainer, and 4 bbls dumped on p qp top of it. Later the cement/retainer was pressure tested to 3,000 psi on May 7th 2007.The top of cement was confirmed bytagging it with eline at 18 089' MD on May11th 2007. gg g � As far about the window exit it appears that whoever made the original NK-14A schematic named the deeper window in correctly.The window depth for NK-14B can be found in the attached schematic. Let me know if you need any more information. Thanks, Jacob Thompson BP Alaska Rotary Drilling Engineer Cell:(907)854-4377 Office:(907)564-5579 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday,January 24, 2017 8:58 AM To:Thompson, Jacob Subject: PBU NK-14A(PTD 206-031, Sundry 317-021) Plug for Redrill Jacob, Was the cement plug with TOC at 18170'CTM pressure tested? NK-14A has been plugged since 5/2007,correct?What is the"millout window(NK-14B) 18219' MD"on the schematic when the whipstock is at 13000' MD? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a alaska.gov 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI IIIN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Sus Well Inspection Rpt Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 206-031 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22668-01-00 7. Property Designation(Lease Number): ADL 0034625 8. Well Name and Number: NIA NK-14A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,NIAKUK OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 19660 feet Plugs measured 18089/18170 feet true vertical 9072 feet Junk measured feet N O V 14 2016 Effective Depth: measured 18089 feet Packer measured 17923 feet G true vertical 9090 feet Packer true vertical 9024.04 feet y OCC Casing: Length: Size: MD: TVD: Burst: �� Collapse: Structural Conductor 80 20"94#H-40 39-119 39-119 1530 520 Surface 6377 13-3/8"68#L-80 38-6415 38-4517 5020 2260 Intermediate 18083 9-5/8"47#NT-80 36-18119 36-9102 6870 4760 Production Liner 738 7"29#L-80 17960-18698 9038-9191 8160 7020 Perforation Depth: Measured depth: 18219-19620 feet SCANNED NAR 3 12:017, True vertical depth: 9144-9079 feet feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 33-17979 33-9046 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 4.5 HES Series 10 SSSV 2118 2109 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP Q SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature 1 — Phone +1 907 564 4424 Date 11/14/16 Form 10-404 Revised 5/2015 V,6y�//!i 2 1 I a ` RBD„ S f l/NOV 1 2016 Submit Original Only • Suspended Well Site Inspection Form Initial Inspection Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: Niakuk No 14A Field/Pool: Prudhoe Bay Field/Niakuk Pool Permit#(PTD): 2060310 API Number: 50029226680100 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 5/4/2007 Surface Location: Section: 36 Twsp: 12N Range: 15E Nearest active pad or road: NK Pad Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1)a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Good Gravel Pad Pad or location surface: Level Gravel Location cleanup needed: Remove Timbers from right side of wellhouse Pits condition: N/A Surrounding area condition: Good Water/fluids on pad: Some frozen puddles Discoloration, Sheens on pad, pits or water: None Samples taken: None Access road condition: Good Gravel Road Photographs taken (#and description): 2 Photos-Wellhouse, Timbers on side of Wellhouse Condition of Wellhead AOGCC requires: 1)a description of the condition of the wellhead, 2)well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: Good with some corrosion, Inner Casing test port appears to be weeping,wet appearance, SSV hose leaking, Production tree installed, no flowline, blinded. Extra SSV bleed barrel in wellhouse, misc. control equipment laying in wellhouse floor Cellar description, condition, fluids: Gravel filled no cellar, small contaminated gravel spot where SSV hose is leaking Rat Hole: N/A Wellhouse or protective barriers: Wellhouse-good condition Well identification sign: Yes Tubing Pressure (or casing if no tubing): SSV closed no hydraulics Annulus pressures: IA=500psi, OA=300psi Wellhead Photos taken(#and description): 6 Photos-Bleed barrel, Misc. control panel, wellhead/tree, IC test port Leaking SSV hose, contaminated gravel. Work Required: Remove misc. unused equipment including extra SSV bleed I,fix and clean up leaks Operator Rep(name and signature): Joshua Stephens AOGCC Inspector: Jeff Jones Other Observers: Inspection Date: 10/10/2016 AOGCC Notice Date: 10/9/2016 Time of arrival: 9:40am Time of Departure: 10:00am Site access method: Pickup Truck • • 0 0.4 0.2 0 0.4 Miles bp = ===imill A NK-15 INK 4' NK-17P61, AA(IIK-17 '4s'14 , 'NK 17PB2 NK-4IPBt Legend XNKNO2A ,,,,1002 Pipelines(General) cor'.09 3.NI\r:(riOtIlld NS-I 2C'"-'2a Buried -Os Pipelines(Detailed) -NK-12A NK-01AK-65 011 4 NK-38A ,..-------- ----Xi:400 -IN K-0 I ', T N ' .--,"" GI, ./4-4"-v-• —MI NK-01A 40(-386 ' I K-65P81 /". --‘A 1( :NK-07 A NK-10 '1/40^, K-43 4 NK-42 ,1414-3,3APS k, --V‘at,:r I —Relief 12 NK-6 -202APB1 '''• ' 5 ' 564K-6 ''' c 5—t.II11111. . t NK-62A ,c-t•P'*''''"'"-- 5(616-20APB' , t 111.110sl 11 •NK-05 i NN5 I9A ••••,I •I 0 •,1 Pi Ichn,.‘.. 1 K 21 NK-18 14K, •5 35 fiy . L5-28/1 :L5-28 ' 't . t'' .• 4 . ... NIC 2, r ' L5-28A L 1 n L5jr:SAE 2-26 rs, Author: 15 26P131 ''1_5-33PEil L5 26P52 f•L5-31 14 November,2016 L5 32 BP1\catrg1 ©BP Exploration(Alaska)Inc All rights reserved This map is informational In nature and is presented without representations or Product of BPXA Atlas Enterprise GIS. alaska-gis.bpweb.bp.com warrantes as to accuracy completeness or use for any purpose TREE- 4"CNV NK-14A S NOTES:WELL REQUIRES A SSSV*** W�LHEA� FMC 13 518" UNIVERSAL A (SUSPENDED 05/04/07) ACTUATOR-- BAKER OKB. (3EV= 59.8' BF.ELEV= 2403' KOP= 18216' E;OGN0O d ?MxAngle= 103@19352' — ® I r 2120' -4-1/2'HES SERFS 10 TRSSSV,D=3.813" ! Datum NO= 18224' D= J ( tum TVD= 9200'SS GAS LFT MANDRELS 13-3/8'CSG,68#,L-80 BTC,D=12.415"JH 6417' 1 ST MD TVD DEV TYPE VLV LATCH FORT DATE 4 4004 3503 55 OTIS TB DMY RM 0 03/26/06 _ 3 11059 6369 64 OTES TB DMV RM 0 03/26/06 Minimum ID = 3.80" @ 17969' 2 15276 7987 67 OTIS TB DMY ! 17_ 0 04/02/02 4-1/2" HES 'XN' NIPPLE 1 17842 8994 68 OTIS TB i OMY I RA 0 06/02/96 I 17913' --[4-1/2"NP,HES X,ID=3.813" 1 17925'-I-9-5/8"X 4-1/2'TTW HBBP PKR, W/ANCHOR LATCH,D=3.916' ' r 17949 4-1/2"HES'X'NP,D=3 813" TOP OF 7"LAR --1 17967 f 17962' -9-5/8"X 7"TI K,BKR LTP &FLEXLOCK LNR HGR,D=6.313" ' ' 17969' -{4-1/2"FES XN NP,MLLED TO 3.80"(XX/XX/XX) 4-1/2"TBG, 12.6#,L-80 BT-M, .0152 bpf,ID=3 958" --I 17980' J - ' 17982' -14-1/2"WLEG,ID=3.958" 17980' H ELMD TT-LOGGED 10/06/97 9-5/8"CSG,47#,L-80 BTC-M,D=8.681' I- 18121' ` MIL LOUT WINDOW(NK-14B) 18219'- 18226' BKR CEt4TE3'JT RETANER(04/29/07) -, 18170'CTM .7. 7. 7..% t".1'.Y.Y.4'.�1' 4-118"OPEN HOLE LATERAL MAN HOLE EST TOP-OF CE31ABVf(04YJoioi) �-�18089' ELM D *' * -{ 19660' 7'MEC.HAMCA L WHPSTOCK 1-1 18215' 1--- . ,,r *;, w 1 PIP TAG 18226' 1#I!. 7"FAILED MECHANICAL WHIPSTOCK -{ 18240' •.44,.'r.:r . w!RA PIP TAG @ 18250' �A PERFORATION StJMFMRY *.• * OPEN HOLE S/T - 19150' REF LOG:FMT/GR ON 05/22/96 * 4.'.4.1"• *' . ANGLE AT TOP P .630 @ 18220' yC�. `y *'+';�' 4-1/8'OPEN HOLE LATERAL R.UGBACK#1 - 20541' Note:Refer to Roduction DB for historical pert data r.+'.+• . '.Y .: SCE SPF INTERVAL Opn/Sqz SHOT SQZ �►,`c�i�w�y,. 2-7/8" 6 18220-18240 S 04/18/06 * Yr+..4`}y* 4-1/2" 5 18256- 18276 S 04/18/06 .f4i 4-1/2" 5 18284- 18418 S 04/18/06it4y t►# 18612' -FISH-2 ROLLERS AND 2 ALLEN SCREWS ' 1.+, OFF ROLLER STEM 8/13/96 i ,a'.;'.�'.Y.a' PBTDH 18615' *.*.*.a.4, v..r.1'.1'.4'. 7"LN2,29#,L-80 BTC-M, 0371 bpf,ID=6 184" H 18700'— .yam*"-'.��t*- DA TE REV BY WM:NTS DATE 'REV BY COMMENTS MAKLJK MI 06/08/96 POOL 7 INITIAL COMPLETION 03/23/14 PJC DRAWING CORRECTIONS WELL: NK-14A 05/04/06 NORDIC 1 CTD SDTRACK(NK-14B SUSP) 04/21/14 KP/JMD CHANGED SUSPENDED DATE PERMIT No '2060310 04/30/07 GLM'PJC PM 07/08/14 PJC CSG TBG1 LINF32/GLV UPDATES AR No: 50-029-22668-01 06/21/07 CS/PJC CBP PULLED(4/28/07) 07/09/14 PJC LEGEND UPDATE Sec 36,T12N,R15E, 1358'FSL&944'FEL 02/18/11 M3/JMD ADDED SSSV SAFEI Y NOTE 01/27/14 GJF/PJC SSSV CORRECTION BP Exploration(Alaska) • • Packers and SSV's Attachment NIA NK-14A SW Name Type MD TVD Depscription NK-14A SSSV 2117.54 2109.33 4.5 HES Series 10 SSSV NK-14A TBG PACKER 17922.75 9024.04 4-1/2"TIW HBBP Packer NK-14A PACKER 17962 9039.03 7" Baker ZXP Top Packer • N O >- co 47, E E a� O Q 44-7 Y Z O O Z Q 6f�w N 0 0 c C U) -a _ N N 0 ?> E a d cn a) 5 Q U) 0 Cl) Z LU Q O 0 O co F- O - m 1= O U tt h'1 N" qri i Na �Y 3'' 1 s , !, dtA M1 W ,i°et4 AtM , ' Trir a g s r' P r 1,:i �;f'i' 1 ': , fi Y P ..4' � 4 F 6 . � ,:. , ;a' ,1 w H w^^ ^ 7 2 n i.� • R' L J , ' ti;;'f 111 N t vio is`E _ 4 e , i 3, 4 tititti ,0011, 101,0111111 T`;' x^n Msfr 4 ' ' l '''' . ..,,,, ? 4 4 4 ' • '", N ii I � /t...,i f , # , i , / / ''i ,...lir / 4 e p I11, 414Pertr*. ,, . 15,iril" "AL gL,'4 ..if.'"' `1,119,--; - 41111,14.44,/-464P ' , '44 44**'`,.. -."'‘‘' '2.4 •• * '' r '3" " tr.' ' "O' .-, *,--4'.Ar,..". t4„ ,„ * , ,`,•. ro#c At 116 Aillh , gr t '741 It7,./7004:10 ' ":' ..,,,i, /'":.' . .'1114'''.. II Iii • . 0,,._* 4411111.0 0, 11* 41011t jilt*° ,,.1 . ....4** .• 4 ',. 'T '*4' )stlfois ''''' .4,/ . ,,,,," •:: 1 4000,144'111plir......4.-,- ' ,.--eA.g..e.t., . jp.thi, :,,. . . .0„* , %,-- , ' , - — ..r. ',?0::,‘"Pf• ..44118," N. * -' ' 4E - . °""*•:"*. 4.'7,4 #' 416'' it' '4** " ' - * ' ''-- •IPir'' .4,144,: ' 111L,. ...4 ''''',.6.,`# '6. l's 1160. e• N.,*,011* ' 44415frip i ,* .4, *4' ' 4-'•-"4:, ,,,` .2'. P./...'' '4 .., •„f .." ^ ''''4,Aft.' 41;‘ ,,Ir. it f 7 • '''' * 4* 1... , . .........,, vow.,17w?,.,.7,....,., •....7,.:et,..)-„, . 4 ,,,.4 ,, 1,-ror ,v.„ .40, '. ,....,, - ' , . -"• a- , iiir ,...- . - • -....-,:.... .. , , .alt 41.f Aillihr, g .41,... ..• Z ,...- OZ. ..o•••'•,,, * ,,0. *I a,,:, * ,,,,..taf *kielt., : , • v .....• g . 111, ‘".••• ~1' • ' ' 1 • 4 , k'dr ilk f t • 1 , t 4i 1''. 4 t'r ttt• ' = * 4 . : *ir..141.4*,.'"*.. ::*.':r, _ilp . .,,,7. , •..1".' , ''.',..,,,• ''''): . .*: , '1;4. . - ''' - - • '',,,..e..."-•'''' b.. ' , , r 4141".. 40 . . 'IIAIPI Y 00014-.4.0 4 , i c . .... .' ,„,-.,:- ..„, ,,,'.., • .0- 0 !or .. - .., , , , :• Ito ,, ,.... , . ,z ,,-—•mis....,.., ,,, or ,-, 4.4,i.:, _ ,toelii i000 , 0„,..,..., „4. ,.,•• ,,ear I. A012 jiti :7- I 4Viler • .40., '''..:%14p7 l'e•-• 6`.111epree* I.. A.....:. - 44•4' 11. elk aw 41111V" ' \I -ip 400 At.4trl.tz-. f API" 444' N, • ,.0 A..•'*4o,:toV4it*ols ii,,ipk,„l„mku ,o'r4k'. io rl." II 1ilA1l1ff 14lk00 'MP 111111 - ' , e 1 ' .., • ' i1tr *k. II ../. • . 1/: * / ... illit.• „, 0 *IP la ,'," , t * .1.0,1111111r... . - t"'' ,4,i;i0 ' 0,'' 4—.1,-;07 . `' .."'"*.; 11 ' _ r ... ail , Joh, , ".... 4 .... ,,..e.' ,, ' 0 ' ..... • .,... -' ,1 - .-, • , , V k. ,,, * 4 . 4 " ; 41-4-•••'-‘ -lib oti, R ' - ? . . W e: pr 3,w.„waBX4'lariw:..� ''... '''''', ' , 411 pE ; ' { » 7 1 '4* \ « . . . < : .....,... ,, 4 ' ‘4,t)r ''•'.' '.' .., '. tt, .,. ..,..,...,,, „ . ..:,... ...:.. ,.. . ., i ,.... .... ,. . ...,.. ,. .. ,.. .. ...,..,,,,, ° 1111111110111110' ., . • = • .••• ....,• - Pli 42 ' I° r3C) .. %Ill. 4fittg 4 4 ,,,,..1 f' ,• i # ,f„.. -, - .i ,,o- ." * I -,-..• -, - . f / .. i 0,-', ,, ., ' '-. ':.iiifi:#4'-'1'.•,4:' :.41 .. ., . ., ,,,.,•,. ,...1, '"-,... :-:'•A4., . ,. a # d3 9, {. ` ,';',1.'" � a #,##b{ ia er 4s r t .. tr q� .1# '4. o . . , , 14 ,,, ....,, ,„.. , . ,,,,,, ... ...._..... . ,. , ,........ , a ria�.� ✓�' , ...''' . ..•-...,, .,-• „,.• I ., v• • ,, . , ... . , ., .. - .. • .., r •,;,. 4,....' :. . . ' ..... , ....,..„ ,........ ,, . 1-.--,.- -- ,,,--,,,,, --,..-:..,1,-azi,- , -,,,i7-Ri„.,, it . .„ , •,,,,•:,...,..,,..., . .r,..-:„.:,i4....4-,„--,t...--.,13' 1 ...„7.', II , -.,- ' ' - .:„.11,-..' 71,..f.„ ..-,,...--.., '„,- . ,. L., 1 ,,,,,,,kir „,,,::. .,,,!„ ':' „...4 ,. ',,,' r,,,,,, ,.. „..._,. .. mi 314- ....-;„ ., .. . II* 0. ' : 1 l' . : -, „ ,- . - .- .. ' -. ., ,t-': - . °Ii '' '•.' li- , 'i , , .. „, . . ii. . . . '... ; . .. „ ., . . . , .„, . ..„ i . .. . „.. ',„......... . .....„-, 7: . 1.• ,,., - ',.. 0.0:•- '''''''''''',,, .:4; ,........ ,. , - "." ' '...;:;;;CtrA,..,, ,, ....:• .,...,1,....44..,,.•''.:;;;;-.4. . . ... . ......- . ... .... 4 ',:,,-e''.,,''L'''''',,',‘,1','A,.;,',4"•'•:i'i••4ii0-t'i4.,.'''.S'•',.''.-„?,;•-;.,,:•- ;T.i„,..'),'.,...,.e..t','-,.-'.2,,''-k',''•„.Irl'i!",•',-*!1s•;',.,.;f:4,",7.;0•q:1...:,.4,4:.;.,.4.....! 4 ; . e14.:..:.2 17•P,t: 47 - * • , : . •-' , • ' . • ' ,,-,.,. :.,!•---,:•-''',,-;',.,-,',--„;,...,;:.?...,wit...„:::',-,i0-,- -' . N::. . .... - di r • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 10/10/16 Inspector: Jeff Jones Operator: BPXA Well Name: PBU NK-14A Oper.Rep: J.Stephens PTD No.: 2060310 Oper.Phone: 659-5766 Location Verified? Yes Oper.Email: ioshua.stephens( bo.com If Verified,How? Other(specify in comments) Onshore/Offshore: Onshore Suspension Date: 05/04/07 Date AOGCC Notified: 10/09/16 Sundry No.: 307-122 Type of Inspection: Subsequent ' Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing N/A Photos Taken? Yes • IA 500 OA 130 - Condition of Wellhead: Good condition,wing valve,master valve,SSV closed&hydraulics disconnected.Outlet is blinded. Condition of Surrounding Surface Level gravel pad with some frozen puddles and road access,no visible hydrocarbon residue.Some wood timbers near wellhouse. _ Location: Wellhouse in good condition. Follow Up Actions Needed: Remove wood timbers near wellhouse. Comments: Well identified by pad map and well sign permanently attached to wellhouse.Mr Stephens took photos at my direction&they are attached to his report. SCANNED J U[ti 0 8 2.01-,/ Attachments: none REVIEWED BY: Insp.Supry c. . 111101/to Comm PLB 12/2015 2016-1010_Suspend_PBU_NK-14Ajj.xlsx SOF Tye • � THE STATE Alaska Oil and Gas F441 7'4 ®f Conservation Commission tq, Li A sKA Wet 333 West Seventh Avenue letr'x � Anchorage, Alaska 99501-3572 GOVERNOR BILL WALKER g Main: 907.279.1433 °44' fP ALAS Fax: 907.276.7542 www.aogcc.alaska.gov SCANN ` NOV 1 23i5 Ryan Daniel Alaska Wells Integrity& Compliance Team Leader BP Exploration(Alaska), Inc. Qn6-03) P.O. Box 196612 Anchorage,AK 99519-6612 Re: Prudhoe Bay Field,Niakuk Oil Pool,NIA NK-14A Sundry Number: 315-578 Dear Mr. Daniel: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Approval is granted contingent on development of a P&A plan for suspended wells with no future utility which brings these wells closer to abandonment prior to pad decommissioning. This plan must be developed and approved through the Commission by 12-31-2016. Failure to comply with this requirement will invalidate this sundry. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this Z day of October, 2015 Encl. J( RBDMS NOV 022015 STATE OF ALASKA (ALASKA OIL AND GAS CONSERVATION COMM( N • , APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon y / D h,^Perforations o Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspen , Perforate 0 Other Stimulate 0 Alter Casing ❑ Change Approved Program ❑ /� Plug for Redrill ❑ `Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other Renu... Sugr,/t/�yt�s.Q/ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 206-031"' ` z3 - 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 [[[ Development' 99519-6612 Stratigraphic 0 /'P.73'r Service ul 6' API Number: 50-029-22668-01-00 • Tv 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes 0 No IZ1 NIA NK-14A Will planned perforations require a spacing exception? c 2 RECEIVED 9. Property Designation(Lease Number): 10. Field/Pools: SEP 1 2Q15 ADL 0034625• PRUDHOE BAY,NIAKUK OIL• b-rS to(2,3 { j S 11. PRESENT WELL CONDITION SUMMARY AP'1GC(� Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk measured): \•/ 19660 • 9072 - 18089 9090 18089/18170 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"94#H-40 39-119 39-119 1530 520 Surface 6377 13-3/8"68#L-80 38-6415 38-4517 5020 2260 Intermediate 18083 9-5/8"47#NT-80 36-18119 36-9102 6870 4760 Production Liner 738 7"29#L-80 17960-18698 9038-9191 8160 7020 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 18219-19620 9144-9079 4-1/2"12.6#L-80 L-80 33-17979 Packers and SSSV Type: See Attachment Packers and SSSV MD(ft)and TVD(ft): See Attachment 4.5 HES Series 10 SSSV 2118, 2109.80 12.Attachments: Description Summary of Proposal H 13.Well Class after proposed work: A ZS.l' . BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development. 'Service V. 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil 0 Gas 0 WDSPL 0 Suspended RI ' 16.Verbal Approval: Date: WINJ 0 GINJ ❑ WAG 0 Abandoned 0 Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is tru, nd co -ct .the best of my knowledge. Contact Daniel,Ryan / Email Ryan.Daniel@bp.com Printed Name Daniel,Ryan Title Alaska Wells Integrity&Compliance Team Leader 1 wpm--,./if `�� �r� Signature Phone +1 907 564 5430 Date ccp (J� 20/J- - COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 318-Gll Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 o r:�}�v/)/vv-o// 5 y e fir-O .eon- t1%-) e) rhY- o ' cirtr lcphir4-, f of c" P p,�hh OPzr c� U 119 -1 d-e 0,eel S L- ' n�-o At r e v 7-i'Gpr� f vG16G!-z ' b'r 5 I its� b. 115 Lim dirk,kil ct t t Y 6`U r p r�o n/'s i C1�5 � �c �avr /� pad �z'C'av>� hit c 5 5 f��}- /�l R �! t-1111 ?rGi v e r� rd ci vt d ai t��i ✓i 7- thvI-,„it-J-274 c ('d 7 h-t 1 5 5� b ./21311/ YGa i 1 q6 �'�,Y p 1 y �� t�c 5 rz' y�„;:-,2, � �,+��e- �2✓— •-c q fi� Spacing Exception Required? Yes 0 No Su sequent orm Required t r hi i jvv%cLc�, minAPPROVED BYTHE Approved by' /64,...444,..„et7 COMMISSIONER COMMISSION Date:/O-28_1, 7-1- Jo/24 /15' ) , ORIGINAL RBDMS NOV 0 2 2015 It 104,9 Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate /c-LEr,S • 0 Packers and SSV's Attachment NIA NK-14A SW Name Type MD TVD Depscription NK-14A SSSV 2117.54 2109.33 4.5 HES Series 10 SSSV NK-14A PACKER 17922.75 9024.04 4-1/2"TIW HBBP Packer NK-14A PACKER 17962 9039.03 7" Baker ZXP Top Packer = 4"` • N K-1 4 A AFETY NOTES:WELL REQUIRES A FMC'WELLHEAD✓ 1 SSSV.W ELL HAS MGM COMMUNICATION L ACTUATOR= BAKER (SUSPENDED 05/04/07) 'OKB.ELEV= 59.8' I Ll BF ELEV= 24.03' KOP= 18216' _"CONDUCTOR. 7 Max Angle= 103° 19352 #, ( 2120' --14-1/2"HES SERFS 10 TRSSSV,D=3.813" Se i� DtumP. = ___ 18224' D= " Datum TVD= 9200'SS 2GAS LFT MANDRELS 13-3/8'CSG,68#,L-80 BTC,D=12.415" —I 6417' ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3503 55 OTIS TB DMY RM 0 03/26/06 Minimum ID =3.80" @ 17969' I, 3 11059 6369 64 OTIS TB DMY RM 0 03/26/06 2 15276 7987 67 oTISTB DMY 12 0 04/02ro2 4-1/2" HES 'XIV' NIPPLE 1 17842 8994 68 OTIS TB DMY RA 0 06/02196 ' ' 17913' H4-1/2"NP,HES X,D=3.813" 17925' —9-5/8'X 4-1/2"T1W HBBP PKR, W/ANCHOR LATCH,D=3,916' ' ' 17949' H 4-1/2"HES'X'NP,D=3.813" TOP OF 7"LNR — 17962' ,, 17962'_i_19-5/8"X 7"TIEBK BKR LIP &FLEXLOCK LNR I-$GR,D=6.313' I I 17969' —{4-1/2"HES XN I',MLLED TO 3.80'(XX/XX/XX) 4-1/2"TBG,12.6#,L-80 BT-M,.0152 bpf,D=3.958" —I 17980' s 17982' H4-1/2"WLEG,D=3.958" 17980' —I ELMD TT-LOGGED 10/06/97 9-5/8"CSG,47#,L-80 BTC-M,D=8.681" —I 18121' ' MLLOUT WINDOW(NK-148) 18219'-18225 BKR CEMENT RETAINER(04/29/07) — 18170'CTM .` EST TOP OF CGT(04/30/07) El$0$9'ELMD %4 4-1/8"OPEN HOLE LATERAL MAN HOLE 19660' 7'MECHANICAL WHPOC STK 18215' sI w/PIP TAG a 18226' !". Vol' „irtr../riCat 14 7"FALED MEC HAMCAL WHF'STOCK 18240' + � 41 millo 41P 4. w/RA PIP TAG Q18250' !410 % PERFORATION SUINRNIRY ,OP OPEN HOLE S/T 19150' REF LOG:FMT/GR ON 05/22/96 liAliAli ANGLE AT TOP PERF:63° @ 18220' ►�; (VI*�y Note:Refer to Production DB for historical perf data ►' � 4-1/8'OPEN HOLE LATERAL FLUGBACK#1 20541' SIZE SPF NTERVAL Opn/Sqz SHOT SCE `, � 2-7/8" 6 18220-18240 S 04/18/06 e"%e%;� 4-1/2" 5 18256-18276 S 04/18/06 �f 4-1/2" 5 1$284-18418 S 04/18/06 �A1 ll lei�-•co 18612' FISH-2 ROLLERS AND 2 ALLEN SCREWS OFF ROLLER STEM 8/13/96 elegy % PBTD H 18615' R1114.9 r'1).1/4*4 r LNR,29#,L-80 BTC-M,.0371 bpf,D=6.184" —I 18700' DATE REV BY COMMENTS DATE REV BY COMMENTS NAKU(UNIT 06/08/96 POOL 7 INITIAL COMPLETION 03/23/14 PJC DRAWNG CORRECTIONS WELL MK-14A 05/04/06NORDIC 1 CTD SDTRACK(NK-14B SUSP) 04/21/14 KPIJM} CHANGED SUSPENDED DATE FERMI fslo:Ilt060310 04/30/07 GLMPJC P&A 07/08/14 PJC CSG/TBG/LNBR/GLV UPDATES API No: 50-029-22668-01 06/21/07 CS/PJC CEP RJLLED(4/28/07) 07/09/14 PJC LEGEND UPDATE Sec.36,T12N,R15E,1358'FSL&944'FEL 02/18/11 MB/JM) ADDED SSSV SAFETY NOTE 01/27/14 GJF/PJC SSSV CORRECTION BP Exploration(Alaska) ! r BP Exploration (Alaska) Inc. ` Douglas A. Cismoski, P.E., BPXA Wells Intervention Manager O° Post Office Box 196612 i# Anchorage, Alaska 99519-6612 August 28, 2015 Ms. Cathy P. Foerster Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Niakuk Well NK-14A (PTD # 2060310) Application for Renewal of Existing Suspension (10-403) Dear Ms. Foerster, BP Exploration (Alaska) Inc. completed an AOGCC witnessed suspended well inspection of Niakuk Unit well NK-14A on 05/31/2014 (20 AAC 25.110 (h). This recently submitted suspended well inspection reflects the current condition of the well (reference 20 AAC 25.110 (f)) and supports the request for renewal of suspension. Recent events from this well indicate that this well is mechanically sound. Specific attachments include: • Wellbore diagram illustrating the current configuration of the well • Suspended Well Site Inspection form documenting the pressures and site condition Niakuk unit well NK-14A was suspended on 05/04/2007. It is located on a pad with active wells and/or service wells. The strata through which the well was drilled is neither abnormally geopressured or depleted. The well is secured with a cement retainer above a whipstock and cement above and below the retainer. The well is mechanically sound as proven by a pressure test after the cement was placed. Based on these conditions and the inspection on 05/31/2014 Niakuk unit well NK-14A meets the provisions required in 20 AAC 25.110 (a)(1). Based on this information, BPXA requests approval for renewal of the existing suspension status for this well. Attached is an Application for Sundry Approval (10-403) with a technical justification summarizing the information on the current status and condition of the well (reference 20 AAC 25.110 (a), (b), (e), (h) and (i)). In summary, BPXA believes Niakuk well NK-14A is mechanically sound and secure and meets the requirements for renewal of suspended status. If you have any questions, please call me at 564-4303 or Whitney Pettus/ Kevin Parks at 659-5102. Sincerely, , S Dou laismoski P.E. 9 , BPXA Wells Intervention Manager Attachments Technical Justification 2014 Suspended Well Site Inspection form Wellbore Schematic Cc: Doug Cismoski Pettus/ Parks Ryan Daniel i S Niakuk Well NK-14A (PTD 2060310) Technical Justification for Renewal of Suspended Status August 28, 2015 Well History and Status Niakuk unit well NK-14A (PTD 2060310) was suspended on 05/04/2007 after an unsuccessful sidetrack failed to justify a required rig work over. The well is secured with a cement retainer above a whipstock and cement above and below the retainer. The well is mechanically sound as proven by the passing CMIT TxIA to 3000 psi after the cement was placed. In the current state the well will not allow the migration of fluids, will not damage freshwater or producing or potentially producing formations, will not impair the recovery of oil or gas, is secure, safe and not a threat to public health The strata through which the well was drilled is neither abnormally geo-pressured or depleted. Condition of Wellhead and Surface Location Niakuk unit well NK-14A is located on an active, well maintained pad with clean gravel. The surrounding area is in good condition and there is no discoloration and no sheen on the pad, pits or in nearby water. The well pressure readings are T/I/O= 0/300/150 psi recorded on 05/31/2014 and are stable. Request BPXA requests approval for renewal of the existing suspension status for NK-14A A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC 25.112 (i) to allow the well to remain as suspended in its current condition. All hydrocarbon intervals are isolated and there are no underground sources of fresh water in this area. • • Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness 10 Year Well Name: NIAKUK NO 14A Field/Pool: Prudhoe Bay Field/Niakuk Pool Permit#(PTD): 2060310 API Number: 50029226680100 Operator: BP EXPLORATION(ALASKA)INC Date Suspended: 5/4/2007 Surface Location Section 36 Twsp: 12N Range: 15E Nearest active pad or road: L5 Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges,fittings,tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1)a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: clean, active pad Pad or location surface level gravel pad Location cleanup needed: none Pits condition: N/A Surrounding area condition: clean Water/fluids on pad: snow melt Discoloration,Sheens on pad,pits or water: none Samples taken: none Access road condition: good Photographs taken(#and description) Yes,wellhouse and flowline area Condition of Wellhead AOGCC requires: 1)a description of the condition of the wellhead,2)well pressure readings,where practicable, 3)photographs showing the wellhead condition Wellhead/tree/valve description,condition: FMC wellhead. CIW tree, all valves functioned,SSV partially opened Cellar description,condition, fluids: filled with gravel Rat Hole; N/A Wellhouse or protective barriers: Yes, house Well identification sign. Yes Tubing Pressure(or casing if no tubing):0 psi Annulus pressures: IA-300 psi OA-150 psi Wellhead Photos taken(#and description): Yes,wellhead,tree, IA,and OA Work Required: none Operator Rep(name and signature): Laurie Climer AOGCC Inspector: John Crisp OTOb rvers: Ryan Hayes Inspection Date: 5/31/2014 AOGCC Notice Date: 5/29/2014 Time of arrival 12:45 PM Time of Departure 1'00 PM Site access method. truck • 1111 TREE,- s 4*ClIsk MC 13-Se WE I.IsEAO LIPSVIIISAL -N K 1 4A SAFETY NOTES:WELL REQUIRES A SSS V WELL HAS LAGAA COIC MHICA noN A CTLM l'OF BAKER (SUSPENDED 05/04/07) KB ELEV= 598 EIF.ElPf= 24.00' Mix Angle= 1.13"..':. 4 s Li Vr,,,* [ 2120' H4-1/2"FES SS 10 TASSSV.0=3 six-, Nun 143. 18724' 1E3 Datum IVO= 9200 5S, GAS LIFT 041043RELS L11-30E CEO fik.(TO:ITC T Tiki5;1-4—ii41 7;—] ST- IAD 1110 CIEV TY FE i.' VLV LATCH PONT CATE 4 4004.3510' 54 OlIS TB DOLE RA 16 04/0402 3 11059 6431 64 011S TB SO Rh 24 040402 2 15276 8079 67 oils Ta, CM/ RA m in imum ID=3.80"4 17969' 1 17842 9104 68 oils le, 066' RA 4-1/2"HES'XNNIPPLE inir I--(4-12,NP.HES X.V•3 BIT i I I ... r-17125' 1— X 4-1/2-NW HEMP RCN. arrou I ' VVIANOION LA tat o=3913- 12I4r H4-10-NM'X'MP,13•3 81T I TOPIE 7.11,811—1 -I 7962. II , 1E96T1_:9-3/8*X r%BK.PciR t.TP I &FLIEfLOCK LNR HCA 0.6.313' I XN IT'S, — 4.Ifr THG 12 88,NT410, 0152 big 0.3 9581-1-1 nNur 1 4,-ur riEs MP,PALLED TO 340'(XX/XXAX) I 171144 -irr WLEG,13=3 ese-[ [ 1711110 --IB-MD ri--Locom lomeosi 1 I-9-51r CSG,478,NT-80,0 86-75 -4 15121J. 14..t.01.11 A114DOW(NK-148) 18770 iftne I SKR Cat3.4T RETAPER(04/29/07) 1-1181 TT CTM I .0.11.0.44.40. ...,......_ les7 TOP OF caw.m6'6-616-1 i noes.Euliiii 'OF 0,:ril! ••11011,11,‘ 40.10,041! 14-lir CCEN s sOLE LA ILRAI MAN HOLE H 19680 ,,,‘„„ r 1A1-0iAPIICAI WO-IPSTOCX •• 15215' y ..Tp:/".;9..-,S.; ...,-7.... tv/PP TAO M 1112211- '1.%%:%:••• --- •••.,1„,.1,144: , _ 7'r•A 7,m turc4 4A hoc.,t wi-"Ps Tcx-x 15240' 1.- i• RA PIP I AG M 18260' NrI610.' ...0,0 1,4 le07070‘:•.0 PERFCRATION SULIYARY 'VW VW OPE/41101E SIT 19180' 04104610,0 d'elfee, FEE LOG.RIATTGR ON 05122/96 %.%.•••••1 eirs'eaT40 )0006%N, ANGLE AT TOP FERE 63'@ 18220' soflofleaT si.N.N.NSN' e e•....e.r Noie Refer ko Production TM for hakincal pert .1.1,6'0/43111011 LA'TPA' PI LORACKAt ! 20841 vi.‘"00••••• SIZE I SPE INTERVAL ,Opn/Sgir SI-OT S(2d'Oe.r.ei III.0'I it 2-718" 6 18220-18240 I S 011/1805 •1101‘•%1" 417 5 18256 18276 S 04f18106 6&cif*evil 4 1/7 5 18284 15418 5 04/1606 el; '44'4 15617 --FISH 2 ROLLIPS AM3 2 ALLEN SCREWS i• I 1# *-4,11, * 40' '4•1% OFF KILLER STEM 8113,96 •11.110: 1k. eN4INV1411 I _ ")(•eN111A4 Z.4ifeses es,. I MD !—F 11412" 1r Liwo..no.re-eo. 0371 bpi.D..6134- I 15700' 4956Sf: DAN 1 REV BY COMMENTS OA TIE FFEV BY'--- COSILENTS MAMA LNFT 011811196 POOL 7 itinAL COMPLETION 01727/14 GO/P/CrS5SV CORRECTION W1 I PIK 14A 7 ,C TD/MG 14A ARAM:1MA 0323414 PJC CRAVING CONHECI1ONS 115(04/0111NONOIC 1CTDSOTRACK f P141413 SLP) 04/21114 KFIJAA) ChANGED SL6FOCED DATE 04/30/07 GLAM0C PIA 06/21/07. CS/PJC OSP RJLLED(4/28007) 02/18/11{'AS/A43 ACCIED SSW SAFETY TON FITIlif lb .,111',II.11 AR lb 50029-22668-01 Sec 36,T12M R15E_2199 25 FEL 1321 43 FM. GP Esploraelort(Alaska) • • • Loepp, Victoria T (DOA) From: Daniel, Ryan <Ryan.Daniel@bp.com> Sent: Thursday, October 22, 2015 9:01 AM To: Loepp, Victoria T (DOA) Cc: Sternicki, Oliver R Subject: FW: PBU Suspension Renewal Wells Good Morning Victoria, Thanks for the conversation this morning. BPXA currently have 59 suspended status wells,of which many would not have *future utility today. My view for the business and from a risk perspective is to leave these wells "as is" until pad level decommissioning. The SU wells on pads with trees are monitored daily and pose minimum risk to our operations. Any wells,that are determined to have a higher risk associated with communication, re-pressurization etc will certainly be given priority for intervention and mitigation. *Additionally,as the business starts to realign from oil to gas over the next 10-15 years we would want to preserve various options (wells and surface locations)for the future. Let me know if you have any other questions Rgds Ryan From: Loepp, Victoria T(DOA) [mailto:victoria.IoeppCa alaska.gov] Sent: Wednesday, October 21, 2015 3:56 PM To: Sternicki, Oliver R Subject: RE: PBU Suspension Renewal Wells Oliver, At what point will these wells with no future utility be brought closer to abandonment?Approximately how many suspended wells are in this category? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loerm a@.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alasko.gov 1 • • ! Loepp, Victoria T (DOA) Subject: From: Daniel, Ryan [mailto:Rya., n'niek bp.com] Sent: Tuesday, October 20, 2015 4:25 PM To: Loepp, Victoria T(DOA); Sternicki, Oliver R Cc: Regg, James B (DOA); Julian, Jennifer Y; Bill, Michael L(ASRC) Subject: RE: PBU Suspension Renewal Wells Hello Victoria, Negative. BP and its working Interest owners are developing some longer term options for"decommissioning" work scope which includes some wells and surface kit.These are screening opportunities only(potential future activities) and still in the very early scoping stage. They are not funded or approved yet,and as such it would be premature for BPXA to comment any further. The Observation well P&A program which I discussed recently with Jim, and the Suspended well renewal applications submitted by Oliver are also separate(discrete and unrelated) activity plans for well stock management and as such have different timelines and rational. We are happy to discuss the Suspended wells further id necessary. If you could use Oliver as the single point of contact for this work that would be much appreciated. Thanks Ryan From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Tuesday, October 20, 2015 2:16 PM To: Daniel, Ryan Subject: PBU Suspension Renewal Wells Ryan, Do you have any information to share with us on the sustained P&A program and where these suspension renewal wells fit in the program? Thanx, Victoria 1 • • From: Sternicki, Oliver R [mailto:Oliver.Sternicki(�bp.com] Sent: Thursday, October 08, 2015 4:03 PM To: Loepp, Victoria T(DOA) Cc: Daniel, Ryan Subject: PBU Suspension Renewal Wells Victoria, This is the response from Base Management for the 9 suspended wells renewals and if the fall under A or B of 20AAC 25.110(a)(2). 20 AAC 25.110(a)(2):the well (A) has future utility as an exploratory, development,or service well; (B) is a viable candidate for redrilling; or (C) is located on a pad or platform with active producing or service wells. WGI-01: no current sidetrack plans 02-30B: no current sidetrack plans G-13A: no current sidetrack plans, but may use surface equipment for another well V-201: no current sidetrack plans S-14A: no current sidetrack plans W-09A: no current sidetrack plans E-18B: evaluating several sidetrack options NK-14A: evaluating a sidetrack option Y-25A: no current sidetrack plans Let me know if you have any other questions. Regards, Oliver Sternicki 3 WV atwes Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternickiabp.com From: Loepp, Victoria T(DOA) [ nailto:victoria.loepp@alaska.gov] Sent: Monday, September 28, 2015 3:10 PM To: Sternicki, Oliver R Subject: RE: PBU Suspension Renewal Wells So no well listed below,with the exception of 1-100 has future utility as an exploratory, development,or service well and no well listed below is a viable candidate for redrilling? I understand the wells are all located on active pads. Victoria Victoria Loepp Senior Petroleum Engineer 2 State of Alaska • • Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeopa1alaska.qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.LoerDo@alaska.gov From: Sternicki, Oliver R [mailto:Oliver.Sternickabp.com] Sent: Monday, September 28, 2015 2:41 PM To: Loepp, Victoria T(DOA) Cc: AK, D&C Well Integrity Coordinator; Daniel, Ryan Subject: RE: PBU Suspension Renewal Wells Victoria, The below wells that you have listed fall under the category; (C) is located on a pad or platform with active producing or service wells. 1-100 which you did not list is the only well that BPXA sent for renewal of suspended status that falls under the category. (A) has future utility as an exploratory, development,or service well; no wells meet the (B) criteria. Regards, Oliver Sternicki WO obbri waft owns,stow Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternicki(a�bp.corn From: Daniel, Ryan Sent: Monday, September 28, 2015 9:26 AM To: Sternicki, Oliver R Cc: AK, D&C Well Integrity Coordinator Subject: FW: PBU Suspension Renewal Wells Oliver, Can you please reply to Victoria on this question, Copy me,or come and discuss if we have an issue. Thanks Ryan 3 • ! From: Loepp, Victoria T(DOA) [mailto:victoria.loepp(la alaska.gov] Sent: Monday, September 28, 2015 9:25 AM To: Daniel, Ryan Subject: PBU Suspension Renewal Wells Ryan, PBU 02-30B 200-126 PBU V-201 201-222 PBU E-18B 204-139 PBU G-13A 200-163 PBU S-14A 204-071 PBU W-09A 204-102 PBU WGI-01 179-031 PBU Y-25A 208-140 PBU NK-14A 206-031 20 AAC 25.110(a)(2):the well (A) has future utility as an exploratory, development,or service well; (B) is a viable candidate for redrilling; or (C) is located on a pad or platform with active producing or service wells. Which wells meet the criteria of(A) and/or(B)? Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp( alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeao@alaska.gov 4 Image I~ject Well History File C~r Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - ~ ~ 1 Well History File Identifier Organizing (done) RE CAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: BY: Maria ~ Project Proofing 13Y: Marta Scanning Preparation BY: Maria Production Scanning Stage 1 BY: Stage 1 BY: ~ /~ / -~ x 30 = ~ ~~ + ~ =TOTAL PAGES (Count does not include cover sheet) Date: 1 ~'~ - /s/ IIIII~IIIIIIII IIIII Page Count from Scanned File: ~ (Count does include cove heet) nt Matches Number in Scannin Pre aration: _~! YES NO Page Cou 9 , p Maria ~ Date: ~~~~~~ /s/ ~ ~" If NO in stage 1, page(s) discrepancies were found: Maria Date: Scanning is complete at this point unless rescanning is required. "iuiuiiuiiium ReScanned BY: Maria Comments about this file: o..~a~, iuuiiiiimuuu DI TAL DATA Diskettes, No. ^ Other, No/Type: Date: Date: a,.v~~~a~ iuuiiiiomiiiu OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ miimuiiiiiiumf' Date: Quality Checked uiiiiiuumii 10/6/2005 Well History File Cover Page.doc • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 08/21/10 Inspector: Chuck Scheve Operator: BPX Well Name: PBU NK -14A Oper. Rep: Ryan Holt PTD No.: 2060310 / Oper. Phone: 659 -5766 Location Verified? No Oper. Email: If Verified, How? Onshore / Offshore: Onshore ¢ Suspension Date: 05/04/07 Date AOGCC Notified: Sundry No.: Type of Inspection: Wellbore Diagram Avail.? No Well Pressures (psi): Tubing SSV closed Photos Taken? Yes IA 330 by operator OA 170 Condition of Wellhead: Wellhouse in place, full tree with good access in place. Flow line removed and blinded. Condition of Surrounding Surface good - Location: Follow Up Actions P Old bolt, flanges, pipe fittings and other debris in wellhouse needs to be removed. Needed: Attachments: REVIEWED BY: Insp. Suprv /4h, Comm PLB 08/2010 Suspended Well PBU NK -14A 8 -21 -10 CS.xls • • BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 v ` 4 l July 6, 2011 _ 8 n' Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue p Anco rage, Alaska 99501 ( 1 Subject: Corrosion Inhibitor Treatments of GPMA Niakuk Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA Niakuk that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Mehreen Vazir, at 659 -5102. Sincerely, Gerald Murphy BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Niakuk Date: 05/15/11 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Wen Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal NK -01A 1780280 500292015801 P&A 3/9/91 NA NA NA NA NA NK -02A 1780790 500292018001 P&A 3/13/91 NA NA NA NA NA NK -03 1780940 500292035000 P&A 4/14/80 NA NA NA NA NA NK-04 1842000 500292121700 P&A 4/14/96 NA NA NA NA NA NK -05 1850270 500292129000 P&A 4/15/98 NA NA NA NA NA NK-06 1852760 500292148600 P&A 4/15/96 NA NA NA NA NA NK -07A 2010830 500292241001 0.2 NA 0.2 NA 0.9 4/30/2011 NK-08A 2010290 500292249101 0.2 NA 0.2 NA 0.9 4/30/2011 NK-09 1941400 500292251800 2.1 NA 2.1 NA 17.0 4/30/2011 NK -10 1931840 500292242500 1.5 NA 1.5 NA 11.9 4/30/2011 NK -11A 2020020 500292278901 1.5 NA 1.5 NA 11.9 4/30/2011 NK -12C 2030550 500292241403 1.8 NA 1.8 NA 31.0 4/30/2011 NK -13 1961340 500292289300 2.3 NA 2.3 NA 22.1 5/4/2011 NK -14A 2080310 500292268801 1.8 NA 1.8 NA 17.0 5/4/2011 NK -15 1970320 500292274500 1.8 NA 1.8 NA 18.7 5/4/2011 NK -16 1940220 500292244700 2.5 NA 2.5 NA 20.4 5/4/2011 5/4/2011 5/8/2011 NK -17 1961650 500292270900 3 NA 3 NA 20.4 NK -18 1931770 500292242100 2 NA 2 NA 17.0 NK -19A 2010700 500292260701 1.8 NA 1.8 NA 15.3 5/6/2011 NK -20A 2050400 500292242901 2.1 NA 2.1 NA 13.6 5/9/2011 NK -21 1940860 500292248700 2 NA 2 NA 22.1 5/15/2011 NK -22A 2012280 500292240201 1.5 NA 1.5 NA 11.9 5/11/2011 NK -23 1940350 500292245500 3.6 NA 3.8 NA 20.4 5/10/2011 NK -25 1970680 500292278000 2.5 NA 2.5 NA 15.3 5/11/2011 NK -28 1940050 500292244000 2.9 NA 2.9 NA 17.0 5/11/2011 NK -27 1950210 500292254700 2.3 NA 2.3 NA 13.6 4/30/2011 NK -28 1980930 500292287800 Sealed Conductor NA Sealed Conductor NA NA NA NK -29 1981900 500292272400 1.7 NA 1.7 NA 10.2 4/30/2011 NK-38A 2042410 500292264001 3.1 NA 3.1 NA 13.6 6/8/2011 NK-41A 1971580 500292277801 9.1 NA 9.1 NA 54.0 5/9/2011 NK-42 1941080 500292249900 2 NA 2 NA 13.6 5/9/2011 NK-43 2010010 500292299800 1 NA 1 NA 5.1 6/9/2011 NK-61A 2080360 500292289301 14 NA 14 NA 110.5 5/15/2011 NK-62A 2030470 500292285201 1.3 NA 1.3 NA 13.6 5/4/2011 NK-65A 2050830 500292286901 1 NA 1 NA 8.5 5/8/2011 STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate❑ Other 0 INSPECT Performed: Alter Casing ❑ Pull Tubing Perforate New Pool ❑ Waiver[ Time Extension ❑ WELL Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drib Number: Name: Development Q Exploratory 11 206 -0310 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 \ 50- 029 - 22668 -01 -00 8. Property Designation (Lease Number) : ` 9. Well Name and Number: ADLO- 034625 NK -14A 10. Field /Pool(s): e PRUDHOE BAY FIELD / NIAKUK OIL POOL 11. Present Well Condition Summary: Total Depth measured 19660 feet Plugs (measured) 18089 TOC feet true vertical 9071.78 feet Junk (measured) None feet Effective Depth measured 18089 feet Packer (measured) 17925 true vertical 9089.6 feet (true vertical) 9025 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 94# H-40 SURFACE -80 SURFACE -80 1530 520 Surface 6417 13 -3/8" 68# L -80 40 - 6417 40 - 4518 4930 2270 Intermediate 18121 9 -5/8" 47# L -80 38 - 18121 38 - 9103 6870 4760 Production 257 7" 29# L -80 17962 - 18219 9039 - 9144 8160 7020 Liner Liner t I Perforation depth: Measured depth: NONE- N0V True Vertical depth: Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# NT -80 SURFACE - 17982 SURFACE - 9047 Packers and SSSV (type, measured and true vertical depth) 9- 5/8 "X4 -1/2" TIW HBBP PKR 17925 9025 , ¢`QED 12. Stimulation or cement squeeze summary: Intervals treated (measured): Fd J _t 201"', Treatment descriptions including volumes used and final pressure: 9 C ,, Cxi iiissiOf1 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: SUSPENDED Subsequent to operation: 14. Attachments: 15. Well Class after work: \ Copies of Logs and Surveys Run Exploratory❑ povelopment ❑✓ Service ❑ Daily Report of Well Operations X 16. Well Status after we SUSPENDED Oil Gas 0 WDSPL GSTOR ❑ WAG ❑ GINJ ❑ WINJ ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564 -4944 Date 9/1/2010 101 ' � �_ Niakuk Oil Pool Well NK -14A, PTD 2060310 Suspended Well Inspection Report BP Exploration (Alaska) Inc. (BPXA) completed a suspended well inspection of NK -14A on 08/21/10. The following attachments document the inspection and the current condition of the well (reference 20 AAC 25.110 (e) and (f)). • Suspended Well Site Inspection form documenting the well pressures and site condition. AOGCC inspector Chuck Scheve witnessed the inspection. • Wellbore diagram illustrating the current configuration of the well • Pad map showing the well location and other wells within one - quarter mile radius of the surface location • Photographs showing the condition of the wellhead and the surrounding location Additional pertinent information: • NK -14A was suspended on 05/04/07. • NK -14A is located on a pad with active producing wells and /or service wells. • The strata through which the well was drilled is neither abnormally geo- , pressured or depleted. • The well is secured with a cement retainer above the whipstock and cement above and below the retainer. • The well is mechanically sound as proven by a pressure test after the cement was placed. • During the inspection, it was discovered the well sign was missing. A new! sign has been ordered and will be placed on the well. -f MLB 08/26/10 Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: PRUDHOE BAY UN NIA NK - 14A Field /Pool: PRUDHOE BAY / NiAKUK Oil_ Permit # (PTD): 2060310 API Number: 50029226680100 Operator: BP Date Suspended: 5/4/2007 Surface Location: Section: 36 Twsp: 12N Range: 15E Nearest active pad or road: Niakuk pad Take to Location Digital camera Map showing well location /Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Good Pad or location surface: Dry gravel Location cleanup needed: None Pits condition: Water Surrounding area condition: OK Water /fluids on pad: No Discoloration, Sheens on pad, pits or water: No Samples taken: None Access road condition: OK Photographs taken (# and description): 5; General site and wellhead Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead /tree /valve description, condition: Good Cellar description, condition, fluids: Level gravel Rat Hole: N/A Wellhouse or protective barriers: None Well identification sign: No Tubing Pressure (or casing if no tubing): 60 psi Annulus pressures: IA: psi OA: 170 psi — 6 e -E. �e g;' C Wellhead Photos taken (# and des r n : 5; General site and wellhead Work Required: Remove flowline blankets and flanges from wellhouse. Ordered wellhouse sign Operator Rep (name and signature): Torin Roschinger AOGCC Inspector: Chuck Scheve Other Observers: Ryafi Holt Inspection Date: 8/21/2010 AOGCC Notice Date: 8/13/2010 Time of arrival: 9:10 AM Time of Departure: 9 :20 AM Site access method: Access Road TREE = 4" CIW N K-1 4 A SA TES: WELL HAS TBGJIA 1 6 WELLHEAD= FMC 13 -5/8" COMMUNICATION UNNERSAL FROM DRLG - DRAFT ACTUATOR= BAKER KB ELEV = _5 (SUSPENDED 05- 04 -06) BF. R EV = 24.03' KOP= 18216' 2120' 4 -1/2" TRSV, HES SERIES 10 NIP, ID= 3.813" Max Angle = 103.35'@ 19352' Q Datum MD = 18224' GAS LIFT MANDRELS Datum TVD = 9200' SS ST MD TV DEV TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 68 #, L -80, ID = 12.415" 6417' 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OTIS TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB DMY RA Minimum ID = 3.80" @ 17969' 4 -112" HES 'XN' N IPPLE 17913' 4 -1/2" NIP, HES X, ID = 3.813" 17925' 9-5/8" — x4- i I2" TNV HBBP PKR, W /ANCHO LATCH, ID= 1916 FF 4-1 /2" HES 'X' NIP, ID = 3.813" TOP OF 7" LNR 17962' 7962' 9 -5/8" X 7" TIEBACK, BAKER LNR TOP PKR & FLIXLOCK LNR HGR, I D= 6,313" 4-1 /2" HES 'XN NIPID = WLED TO 3.80" 17969' 4 -1/2" TBG, 12,6#, NT -80, .0152 bpf, ID = 3.958" 17982' 7982' 4-112" TUBING TAIL WLEG 17980' ELMD TT - LOGGED 10/06!97 9 -5 /6" CSG, 47 #, NT 80, ID = 8.681" 18121' Am EST TOP OF CEMENT (04/30/07) 18089' ELMD BKR CEMENT RETAINER (04/29/07) 18170' CTM 4 -1/8" OPEN HOLE LATERAL MAIN HOLE 19660' MECHANICAL WHIPSTOCK 18215'' — WINDOW 18220' - 18226' RA PF TA G 18225.5' FAILED MECHANICAL WHIPSTOCK 18240' RA PIP TAG 18250' OPEN HOLE SIT 19150' PERFORATION SLUM RY REF LOG: FMT /GR ON 05122/96 4 -1/8" OPEN HOLE LATERAL PLUGBACK #1 20541' ANGLE AT TOP PERF: 63° @ 18220' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 2 -718" 6 18220 - 18240 Sqz 04118/06 4 -1/2" 5 18256 -18276 Sqz 04/18/06 18612' FISH - 2 ROLLERS AND 2 ALLEN SCR 4-112" 5 18284 - 18418 Sqz 04/18/06 OFF ROLLE ST 8/13/96 PB D 18612' 7" LNR, 29#, NT-80_0371 bpf, ID = 6.184' 187 IT DATE REV BY COMMENTS DATE REV BY COMMENTS NIA KUK UNIT 06/08/96 ORIG COMPLETION, (POOL 7) 03/31/03 BGG(rLH TVDSS UPDATE WELL: NK -14A 02/27/01 SIS -LG FINAL 05 /04/06 NORDIC 1 CTD SIDETRACK (SUSPENDED) PERMIT No: 206 -031 05/16/01 RN/TP CORRECTIONS 04/30/07 GLM/PJC P &A API No: 50- 029 - 22668 -01 09/20/01 DRS /KK PACKER CORRECTION 06/21 /07 CS /PJC CIBP PULLED (4/28/07) Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL 09/26/01 CWS /KK I PERFS 04/04/02 RL /TLH GLV UPDATE BP Exploration (Alaska) 800' 165' 4� 1� a 30 6rllrs I s8 ss r � rOr 1 , Enter/Exit 1190r X23 ___ -- 1 n =�� • DATE : 01,05; =9 SCALE : t' 14AP CIA — E : J u PRUDHOE BAY UNIT DS NK t51#�9B Fyn ............. ........... SNK July 13, 2009 Approximate Scale: 1"=300' 009-13c-3-18 AFRO -MURK .- a � s.�. ... ,. .� . .� ._ . .�. � ��� _, f .. Y � �` � n � .,,, is �, A ,. _ .. v f� °-� :�T F; 't�. "..���n. 4 hi � ��� --• " "----- A • +.a L ' �� VF ..� : ` i..k -M l46 NO »^ « .. . .. >. c t ls.. 1 { f •1� d 4 A i r•"y y 3y.a . 1 1 ti ` *� f� YYY 5 jr S 14 i, Will V W G + A� y .t S a <� a• Y NK -14A (PTD #2060310) TIO Plot 111e. MI 14 I I 3,000 P T. IA 2,O00 •_. 0A / OOA OOOA On 00 ,.tee 07/63/10 07 /10/10 07/17/10 07/24/10 07/31/10 0 8107 09/14 0821)'10 0g/ 10 09104,10 0 _ ':' 09/25/10 10/02/10 ~-~; ~. ~~ •. ,~ :~. r ",~,. ~* , x ~:. - ~, .~ ~ s. ~„ ~ .~, ¥'~: a ~: MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~,, w t_ DATA SUBMITTAL COMPLIANCE REPORT 6/2/2009 Permit to Drill 2060310 Well Name/No. PRUDHOE BAY UN NIA NK-14A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22668-01-00 MD 19660 TVD 9072 Completion Date 5/4/2007 Completion Status SUSP Current Status SUSP UI' REQUIRED INFORMATION ~ Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / ly a mea/hrmt rvumaer Name Scale m@ala No Start Stop LM KecelVea GOmments D D Asc Directional Survey 19143 19660 Open 6/27/2006 D D Asc Directional Survey 18225 20541 Open 6/27/2006 PB 1 om' °ED C Las 15774~nduction/Resistivity 18200 20515 Open 12/3/2007 P61 RPM, GR, RPD, RPS, RPX w/PDF graphics C Las 15773~duction/Resistivity 18200 19662 Open 12/3/2007 RPM, GR, RPD, RPS, RPX w/PDF graphics ~pt LIS Verification 18113 19660 Open 3/7/2008 LIS Veri, GR, FET, RPM, ~ RPD, RPS, RPX, ROP I D C Lis 16006 eduction/Resistivity 18113 19660 Open 3/7/2008 LIS Veri, GR, FET, RPM, RPD, RPS, RPX, ROP Rpt LIS Verification 1.8113 20541 Open 3/7/2008 P61 LIS Veri, GR, FET, RPM, RPD, RPS, RPX, ROP ` D C Lis 1600~nduction/Resistivity 18113 20541 Open 3/7/2008. PB1 LIS Veri, GR, FET, RPM, RPD, RPS, RPX, ROP og Induction/Resistivity 25 Col 18237 19660 Open 5/19/2008 MD ROP, PCG, GM, EWR leg Induction/Resistivity 25 Col 9011 9092 Open 5/19/2008 TVD ROP, PCG, GM, EWR 1!!og Induction/Resistivity 25 Col 18237 20541 Open 5/19/2008 P61 MD ROP, PCG, GM, / ~og Induction/Resistivity 25 Col 9091 9208 Open 5/19/2008 EWR P61 MD ROP, PCG, GM, EWR • DATA SUBMITTAL COMPLIANCE REPORT 6/2/2009 Permit to Drill 2060310 Well Name/No. PRUDHOE BAY UN NIA NK-14A Operator BP EXPLORATION (ALASKA INC API No. 50-029-22668-01-00 MD 19660 TVD 9072 Completion Date 5/4!2007 Completion Status SUSP Current Status SUSP UIC Y D C 16261 See Notes 0 0 5/19/2008 MD and TV logs and P61 in PDS, EMF and CGM graphics ~ Well Cores/Samples Information: Name Sample Interval Set Stant Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Daily History Received? /~ N Chips Received? 'Y"1 N Formation Tops W/ N ...~-- Analysis Y / N Received? Comments: Compliance Reviewed By: Date: • WELL LOG TRANSMITTAL To: State of Alaska May 14, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs : NK-14A+PB1 AK-MW-4332571 NK-14A+PB1: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 1 Color Log 50-029-22668-01,70 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 1 Color Log 50-029-22668-01,70 Digital Log Images: 1 CD Rom 50-029-22668-01,70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center, MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 WELL LOG TRANSMITTAL To: State of Alaska March 3, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data: NK-14A AK-MW-4332571 1 LDWG formatted CD rom with verification listing. API#: 50-029-22668-01 PLEASE ACKNOWLEDGE LETTER TO THE ATTENT Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 J _' ..~ -A't~ ~ .. ~ rl;`fi Date: '";i ~ _ ~ 1 OF: BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~~_ ~~ • WELL LOG TRANSMITTAL To: State of Alaska March 3, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Data: NK-14APB1 AK-MW-4332571 1 LDWG formatted CD rom with verification listing. API#: 50-029-22668-70 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services BP Exploration (Alaska) Inc. Attn: Rob Kalish Petrotechnical Data Center MB33 6900 Arctic Blvd. 900 E. Benson Blvd. Anchorage, Alaska 99518 Anchorage, Alaska 99508 ~: ~ , . ~ .. _, __ .~ Date: ~,; ,~ =, ~„„.~ Signed: ~ ~ !. .. . _ ~ _~J:%~J bP ~ ~ BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) Date l 1-30-2007 Transmittal Number:92922 t you have any ueshons, lease contact llou las llortch at the PDC at 564-4y73 Delivery Contents 05-286 ~oto'U ~r~i ~ 15'~-Co~ 05-28BPB1 ~o~-p~9 a iS~-!os 1-39A/N-16d~~-~~~ /~ ~ (oa 1-39A/P61 ~v1~- t b~ 15'$-~ 15-126 -~o /a~! C-32C ~o ~ - t 39 ~ ~ sue, 6~ E-11B -no t"1p2 E-11 BL1 ~o~--off' ~ !~ ~.~~ E-11BLi-01 ao~-~~2{1~ ~~ E-11 BL1 PB1 ~d-~_ot, r ~ r~~lG E-11 BLiPB2ao-~-oil ~~5~`~=1 E-19B ~o~--o~~ # i 3"9~- ! G-25B av~-b ~~ ~ rS~~~ NK-14A~ aato-o3 ! +~ rs}~3 NK-14AP61 ~ac.-p3! ~ r.~-3~-i1 NK-61A ~6(o-03S ~ IS~~ S _h Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2- l 900 E. Benson Blvd. PO Box 1966 ( 2 Anchorage, AK 995 1 9-66 1 2 'y DIVE` .- ~' ~ ~ °~ ,. STATE OF ALASKA `~ ALASKA OIL AND GAS CONSERVATION COMMISSION °' { °' ~ ~ 2007 WELL COMPLETION OR RECOMPLETION REPORT AND LOG ' `~`~~~~s, CQmmisso~~ ,,~ 1a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ®Suspended zoAAC 2s.,os 20AAC 25.110 ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Com p., or Aban 07 12. Permit to Drill Number 206-031 - 307-122 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 4/25/2006 13. API Number 50-029-22868-01-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/3/2006 14. Well Name and Number: PBU NK-14A ` 1358 FSL, 944 FEL, SEC. 36, T12N, R15E, UM Top of Productive Horizon: 3936' FSL, 1706' FEL, SEC. 23, T12N, R15E, UM 8. KB (ft above MSL): 59.8' ' Ground (ft MSL): 19.1' 15. Field /Pool(s): _ Prudhoe Bay Field / Niakuk Pool Total Depth: 2972' FSL, 2221' FEL, SEC. 23, T12N, R15E, UM 9. Plug Back Depth (MD+TVD) 18089 ~ 9090 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 721618 y- 5979895 Zone- ASP4 10. Total Depth (MD+TVD) 19660. 9072 ' 16. Property Designation: ADL 034625 i TPI: x- 715188 y- 5992851 Zone- ASP4 Total Depth: x- 714702 y- 5991872 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed informaf n per 20 AAC 5.071): MWD / SGRD / SGRC / EWR / SROP .~/~VQpf/ ~ ~~0~1 ~ gi~a ~YYD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM ; TOP BOTTOM <SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 80' Surface 80' 3 260 sx Arctic Set A rox. 13-3/8" 68# L-80 40' 6417' 40' 4518' 16" 2000 sx PF'E', 894 sx'G', 240 sx PF'C' 9-5/8" 47# L-80 38' 18121' 38' 9103' 12-1 /4" 375 sx Class 'G' 7" 29# L-80 17962' 9039' 9144' 8-1/2" 200 sx Class 'G' 23. Open to production or inject ion? ^Yes ®No 24. TueING RECORD If Yes, IISt each I (MD+TVD of Top & Bottom; Pe nterval Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2", 12.6#, NT-80 17982' 17925' MD TVD MD TVD 25.: ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT St KIND OF MATERIAL USED 17879' Set IBP in tubing (Removed 04/28/07) 4100' Freeze Protect with Diesel (05!04/06) 18170' Set Cement Retainer (04/28/07) 18089' Suspend Plug w/ 10 Bbls Class'G' (05/11/07) 26. PRODUCTION TEST ~ Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: PRODUCTION FoR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HDUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. ~. ,~ None S ~F~ SEP ~ ~ 2D~~ 5---~~ t Form 10-407 ReVISed O2/~~ ~ I V 1' V ~ t„„ CONTINUED ON REVERSE SIDE ~~^ ~~C,~~~/ 2S. GE~ULOGIC MARKERS (LIST ALL FORMATIONS AN RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Kuparuk 18215' 9143' None 6FS 18215' 9168' 5AA 18281' 9191' 4B6 18389' 9181' 5AA 18841' 9109' 6FS 19479' 9109' Kuparuk 19610' 9081' ~ ~ (~ ~ ~ \ /~ Base HRZ (Invert) 19612' 9081' JEF ~ 6 2007 Alaska Qil & Gas Gons. Commission Anchorage Formation at Total Depth {Name): Base HRZ 19612' 9081' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. 0~ ~ Signed Terrie Hubble Title Technical Assistant Date ~~/~ P8U NK-14A 206-031 307-122 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Di~~ital Well File ~ ~ Page 1 of 1 ,: Well: NK-14 Well History Weli Date Summary NK-14A 4/24/2007 T/I/0= 05/250/150. Temp= SI. TBG & IA FL (pre-CTU). TBG FL @ 288'(5 bbls). IA FL @ surface. NK-14A 4/27/2007 CTU #5. Rig Up. MIRU CTU. Wait on weather to raise mast "** Continued on WSR 04/28/2007 *** NK-14A 4/28/2007 CTU #5. Fish IBP. *** Continued from WSR 04/27/2007 *** Continue rig up. Hold weekly BOP test. MU Baker fishing string with 3.63" JDC hydraulic overshot. RIH. Tag @ 17857' ctmd. Pull up hole with 5k over. RIH past initial tag depth to 17880' ctm. POOH to check for fish. OOH, fish recovered ***Job in progress*'* NK-14A 4/28/2007 CTU #5. Fish IBP. *** Continued from WSR 04/27/2007 **` Continue rig up. Hold weekly BOP test. MU Baker fishing string with 3.63" JDC hydraulic overshot. RIH. Tag @ 17857' ctmd. Pull up hole with 5k over. RIH past initial tag depth to 17880' ctm. POOH to check for fish. OOH, fish recovered. RIH with 3.5" JSN and circulate 75 bbls of 9 ppg NaCI water from 4500'. Perform injectivity test: 0.5 bpm @ 301 psi, 1.0 bpm @ 351 psi. POOH laying in 9 ppg NaCI water. *** Continued on WSR 04/29/2007 *** NK-14A 4/28/2007 CTU #5. Fish IBP.'*' Continued from WSR 04/27/2007 *** Continue rig up. Perform weekly BOP test. *** Job in progress *** NK-14A 4/29/2007 CTU #5. P & A. *'* Continued from WSR 04/28/2007 *** Make up BHA #3: SLB Memory Logging tools with carrier and 3.5" JSN. Log from 18300' to 17800'. Flag CT at 17800'. POOH. *** Job in progress *** NK-14A 4/29/2007 CTU #5. P & A. *** Continued from WSR 04/28/2007 *** Make up BHA #3: SLB Memory Logging tools with carrier and 3.5" JSN. Log from 18300' to 17800'. Flag CT at 17800'. POOH. Confirm good data. Coorelated to SLB Injection Profile w/Warmback/Jewel Log dated 10/6/97 (+10' correction). MU Baker MHA with 3.38" cement retainer. RIH. Correct at coil flag to top of cement retainer. RIH to setting depth of 18170'. Drop 1/2" aluminum ball to set retainer. Inflate cement retainer per Baker supervisor. Perform injectivity test through retainer. Bleed IA and Tu ing to con irm no gas. uccess u y es in egrity of retainer to 1000 si down backside of CT. *** Continued on 04 007 NK-14A 4/30/2007 NK-14A 5/7/2007 CTU #5. P & A using cement retainer. *** Continued from WSR 04/29/2007 `** Class G cement. Displace with fresh water. Pump 6 bbls of cement through ce~ from retainer and lav in 4 bbls of cement on o0 o re ainer. umo s o contaminating to 1 0 5 ctm wit 3 passes rom 175 to 18095'. Pump 1 % XS KCI and chase out of hole at 80% pump rate. Wash all down hole jewelry in the well with up-down-up pass. Freeze protect well from 2200' with 35 bbls of 60/40 meth. Trap 800 psi on wellhead. Notify pad operator of status. Final T/I/O: 800/1223/532 *** Job complete *** T/I/O = 20/380/0 CMIT TxIA 3000 psi. PASSED (plug and abandon) Pumped 18 bbls to reach test pressure CMIT passe on secon a emp see a a s ee eed pressures down rig down FW H P=20/400/0 "*JOB COMPLETE**` NK-14A 5/7/2007 T/I/0= 470/970/100. Temp= SI. Bleed TBG & IA < 500 psi (pre-CMIT-TxIA). TBG & IA FL @ surface. Bled IAP from 970 psi to 500 psi (CLP) to production in 45 mins. Bled IAP to bleed trailer from 500 psi to 380 psi in 20 mins. All fluid. While bleeding IAP, TBGP decreased to 10 psi. SI monitored for 30 mins. No changed in pressure after monitor. TBG & IA FL @ surface. Final WHP's= 10/380/100. NK-14A 5/11/2007 *** WELL S/I UPON ARRIVAL **' (post p&a) DRIFTED W/ 3.50 CENT,TEL & SAMPLE BAILER, LOC TT @ 17,969' +11' CORK- 17,980' ELMD TAG TOC @ 18,078' SLM- 18,089' ELMD......S. BAILER EMPTY **' WELL LEFT S/I **' Print Date: 9/5/2007 Page 1 of 1 sew '-~O`-1: ~~~ ~~~~c~; o~,~ suc.~F ~s ~~ fi~~~-~'~l RECEIVED SEA 0 6 2007 Alaska Oil & Gas Cons. Commission Anchora~~ http://digitalwellfile.bpweb.bp.coin/WIInfo/Reports/ReportViewer.aspx 9/5/2007 ., TREE = 4" CNV WELLHEAD= FMC 13-5/8" UNN ERSA L ACTUATOR= BAKER KB. ELEV = 59.8' BF. ELEV = 24.03' KOP = 18216' Max Angle = 103.35' @ 19352' Datum MD = 18224' Datum TV D = 9200' SS NK-14A FROM DRLG -DRAFT O 13-3/8" CSG, 68#, L-80, ID = 12.415" ~ 6417' r r r r O a ~' Ir,n ~ c~ s « i um ID = 3.80" @ 17969' m ~ HES'XN' NIPPLE N N 0 °rn ~. v N 0 ~ TOP OF 7" LNR 17962' 41 /2" HES 'XN NIP, ID = MLLED TO 3.80"~~ 17969' ~ 4-112" TBG, 12.6#, NT-80, .0152 bpf, O = 3.958" I~ 17982' 9-518" CSG, 47#, NT-80, ID = 8.681 " ~ 18121' EST TOP OF CEMENT (04/30/07) 18089' ELMD BKR CEMENT RETAINER (04/29/07) 18170' CTM MECHANICAL WHIPSTOCK 18215' WINDOW 18220' - 18226' RA P~ TAG 18225.5' FAILED MECHANICAL WHIPSTOCK 18240' RA PIP TAG 18250' PERFORATION SUMMARY REF LOG: FMT/GR ON 05/22/96 A NGLE A T TOP PERF: 63° ~ 18220' Note: Refer to Production DB for historical perf data S~'E SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 18220 - 18240 Sqz 04/18!06 4-1 /2" 5 18256 - 18276 Sqz 04/18!06 4-1!2" 5 18284 - 18416 Sqz 04l18~06 PBTD 7" LNR, 29#, NT-80, .0371 bpf, ID = 6.184" SAF~Y NOTES: WELL HAS TBCa/IA COMMUNICATION (SUSPENDED 05-04-06) 2120' 4-1/2" TRSV, HES SERIES 10 NIP, ID = 3.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OTIS TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB DMY RA j 4-1/2" NIP, HES X, ID = 3.813" I 9-5/8" X 41/2" TNV HBBP PKR, W/ANCHOR LATCH, ID = 3.916' 4-1 /2" HES 'X' NIP, ID = 3.813" 9-5/B" X 7" TIEBACK, BAKER LNR TOP PKR 8 FLEXLOCK LNR HGR, ID = 6.313" 17982' ~ 41/7' TUBING TAIL WLEG 17980' ELMD TT -LOGGED 10/06/97 14-1/8" OPEN HOLE LATERAL MAIN HOLE OPEN HOLE S/T ~-{ 19150' I 19660' I 4-118" OPEN HOLE LATERAL PLUGBACK#1 I-i 20541' ~~ FISH - 2 ROLLERS AND 2 A LLEN SCREWS OFF ROLLER STEM 8/13/96 DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNfT 06/08/96 ORIG COMPLETION, (POOL 7) 03/31/03 BGG/TLH TVDSS UPDATE WELL: NK-14A 02/27!01 SIS-LG FINAL 05/04.06 NORDIC 1 CTD SIDETRACK (SUSPENDED) PERMfT No: 206-031 05/16/01 RN/TP CORRECTIONS O4I30/07 GLM/PJC P&A API No: 50-029-22668-01 09/20/01 DRS/KK PACKER CORRECTION 06/21!07 CS/PJC CIBP PULLED (4128/07) Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL 09/26/01 CWS/KK PERFS 04/04/02 RUTLH GLV UPDATE BP Exploration (Alaska) BP EXPLORATION Page 1 of 14 Operations Summary Report Date From - To ; Hours Task Code NPT I Phase Description of Operations Legal Well Name: NK-14 /~ Common Well Name: NK-14 ' r ` Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 I 4/14/2006 118:00 - 19:00 I 1.001 RIGD I P I I PRE 19:00 - 19:30 0.50 MOB P PRE 19:30 - 20:00 0.50 MOB P PRE 20:00 - 20:45 0.75 MOB P PRE 20:45 - 23:00 2.25 MOB P PRE 23:00 - 23:45 0.75 MOB P PRE 23:45 - 00:00 0.25 MOB P PRE 4/15/2006 100:00 - 00:30 I 0.501 MOB I P I 1 PRE 00:30 - 01:30 1.00 RIGU P PRE 01:30 - 04:30 3.00 BOPSU P PRE 04:30 - 14:00 9.50 RIGU P PRE 14:00 - 20:00 I 6.001 BOPSUFI P I I PRE 20:00 - 00:00 4.00 RIGU I P I PRE 4/16/2006 100:00 - 02:00 2.00 RIGU P I PRE 02:00 - 02:30 0.50 KILL N DPRB PRE 02:30 - 03:00 0.50 KILL N DPRB PRE 03:00 - 03:45 0.75 KILL N DPRB PRE 03:45 - 05:40 1.92 KILL N DPRB PRE 05:40 - 06:00 I 0.331 KILL I N I DPRB I PRE 06:00 - 08:20 2.33 KILL N DPRB PRE 08:20 - 11:15 2.92 KILL N DPRB PRE Prep rig for move. Meanwhile LRS bullhead 290bb1s of 9.4ppg KCL into NK-14 @ 5bpm & 1475psi. Final pressures: THP/IAP/OAP = 150/960/160psi. SI SSSV & bleed off THP from 150psi to Opsi in 10secs. Move rig off well NK-61 A, spot on location while performing NK-14 pad prep Performing pad prep RU crane, PJSM on CT reel swap Swap reels with crane. Install 2 3/8" reel with -20700' of coil. No problems. Finished pad prep. Prepared NK-14 for rig, spotted mats, jacked up rig, moved control panel for TRSV f/ NK-61 to NK-14 SAFETY MEETING. Held safety meeting before backing rig over well. Reviewed procedure, hazards and mitigation for backing rig over well. Back rig over well with no problems. ACCEPT RIG AT 00:30 HRS, 04/15/2006. General rig up. Spot trailers, tanks, RU TRSV panel on NK-14 N/U BOPE's, hydraulic lines, RU cellar RU & change out injector gripper blocks for 2 3/8" CT. Replace 25 broken injector pins & service injector. Meanwhile R/U & held PJSM for PT BOPE. Grease tree valves & perform initial BOPE pressure & function test. AOGCC test witness waived by Jeff Jones. BOP test witnessed by John Egbejimba & Richard Bordes BP WSLs. Meanwhile fill rig pits with 9.0 ppg KCUNaCL brine. Wt Up pits # 2 and 3 f/ 9.0 ppg to 9.4 ppg while Installing pack-off, pull cable thru injector to reel, Install internal CTC, Pull back thru injector, install two RA PIP Tags in Whipstock Tray, RU to install Baker CTC Install Baker CTC, pull test CTC, Install dart catcher. Pump 5bbls of 9.4 ppg Brine ahead, Load wiper dart. Launch & chase with 9.4 ppg brine, Dart hit @ 82.6 bbls. retrieved dart, RD dart catcher sub, Press test CTC, Hard line, inner reel valve to 500 & 4000psi - OK. t MU nozzle, MHA, stab Injector RIH to 815', Circ out 10 bbls of McOH, Closed choke, pumped thru SSSV, opened SSSV w/ 3600 psi control line pressure, RIH to 2526', pumping 9.4 ppg brine at .90 bpm, 432 psi w/ 250 psi back pressure, flowing increased, mw in/out 9.4 ppg Shut down pumps, shut in, monitor well, shut in WHP 530 psi, Wt Up pits to 9.4 ppg, Notified BP Drlg Eng of situation Bullhead down CT at minimum rate .16 bpm at 390 psi moving fluid to keep CT from freezing, while Wt Up pits to 9.4 ppg and monitor well, WHP 450 PSI. RIH, circ at 1.32 bpm, 700 psi, maintaining 475 psi back pressure, returns .95 bpm with 7.62 ppg, IA 1000 psi, OA 190 psi, taking returns to tiger tank, PVT 312 bbls of 9.4 ppg brine, at present - MW in/out .9.5 ppg/ 9.2 ppg, PVT 287 Continue RIH circ C~ 1.31 bpm/380psi. Wt check @ 16900' Up = 45k, Run-in = 8k. RIH to 18500' (below btm perf). Bleed off WHP & SI well. Observe WHP of 410psi. Circ Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 2 of 14 Operations Summary Report Date From - To Hours ~ Task ;Code NPT Phase I Description of Operations 14/16/2006 08:20 - 11:15 2.92 KILL N DPRB PRE 580bb1s of 9.4ppg brine ~ 3.75/3.40-185bpm, 9.4ppg in/8.6-9.4ppg out, 3790psi CTP & 450psi WHP. 11:15 - 11:45 0.50 KILL N DPRB PRE Bleed off WHP & SI well. Observe Opsi WHP after 30mins. 11:45 - 13:15 1.50 KILL N DPRB PRE Continue circ 100bb1s of 9.4ppg brine in & getting 9.4ppg crude Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 13:15 - 16:45 3.50 KILL N DPRB PRE 16:45 - 17:00 0.25 KILL N DPRB PRE 17:00 - 17:15 0.25 WHIP P WEXIT 17:15 - 18:00 0.75 WHIP P WEXIT 18:00-22:15 I 4.251WHIP IP I IWEXIT 22:15 - 23:45 I 1.501 WHIP I P I IWEXIT 23:45 - 00:00 0.25 WHIP P WEXIT 4/17/2006 00:00 - 01:20 1.33 WHIP N DPRB WEXIT 01:20-03:25 I 2.081WHIP IN IDPRB IWEXIT 03:25 - 03:50 0.42 WHIP N DPRB WEXIT 03:50 - 05:50 2.00 WHIP N DPRB WEXIT 05:50-06:40 I 0.831WHIP IN (DPRB IWEXIT 06:40-06:55 0.25 WHIP N DPRB WEXIT 06:55-08:20 1.42 WHIP N DPRB WEXIT 08:20 - 08:30 0.17 WHIP N DPRB WEXIT 08:30 - 09:40 1.17 WHIP N DPRB WEXIT 09:40 - 10:00 0.33 WHIP N DPRB WEXIT 10:00 - 11:55 1.92 WHIP P WEXIT 11:55 - 12:15 0.33 WHIP P WEXIT 12:15 - 12:35 0.33 WHIP P WEXIT contaminated returns back. Suspect we're flushing crude from formation and/or communication in IA. Decide to POOH & P/U W/S. PUH to surface circ ~ 1.25bpm/660psi. OOH. S/B injector & UD nozzle BHA. Held pre-operations safety meeting. Reviewed well status, potential hazards & whipstock setting BHA M/U procedures. M/U BKR 4-1/2" x 7" Gen-2 whipstock, wireline adapter, #10 J-Hyd setting tool, FAIV, Sperry GR/MW D, orienter & MHA [OAL = 71.43']. Scribe tools & M/U injector. GR to BOWS = 47.24'. RIH with BKR whipstock BHA #2 to 1940'. SHT MWD with 1.43/1.21 bpm & 1440psi - OK. Pumped thru SSSV, Open SSSV, holding 3600 psi, WHP Opsi, Orient 2 clicks -got 2 for 2 clicks. Continue RIH to 18225' Run tie-in strip logging down f/ 18225' to 18300', no clear correlation due to high GR interference, sent digital copy and faxed copy of logs to geologist on Nordic #2 for help with log correlation Log up, run tie-in strip f/ 18300' to 18280' Log up, run tie-in strip for GR correlation f/ 18280' to 18190', unable to correlate back to tie-in log due to high GR interference RIH to 18325', fog dn, spot checking GR reference points to 18500', unable to correlate back to tie-in log due to high GR interference POH to 17740', Geo onsite Log do f/ 17740 ' - 17845' for depth correlation f/ RA tag at 17759', correlation log is Western Atlas TCP Tie-In Log Dated May 31, 1996, log has two RA markers in 9 5/8" casing at 17661' and 17759' POH to 17700', Pertorm Tie-In pass f/ 17700 ' to confirm RA markers. Saw what looks like one GR spike @ 17760' but did not see the 2nd marker. Confirm earlier observed spike was false. PUH to 16940' to relog GR tie-in. Log down GR from 16955' to 17033' ~ 1.64/140bpm & 1835psi -getting obscured GR readings. PUH to 16510' to relog GR tie-in. Log down GR from 16510' to 16545' C~ 1.64/140bpm & 1835psi -still not able to correlate GR readings. RBIH to 17820' to relog GR tie-in. Log down GR from 17820' to 17943' C~3 1.64/140bpm & 1835psi. Review logs with Harry Haywood in ANC & tie-into Geology PDC log. Subtract 16' from CTD. RBIH to 18257.53' & position TOWS @ 18240'. P/U to up wt ~ 18249.6' to eliminate CT slack. Check TF - C~3 65L. Orient 1 click to 54L. Orient 1 click to 42L. Orient 1 click to 37L. Orient 1 click to 31 L. Orient 1 click Printed: 5/6/2006 11:56:25 AM • BP EXPLORATION Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Event Name: REENTER+COMPLETE Start: 4/10/2006 Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ; Task Code NPT Phase 4/17/2006 12:15-12:35 12:35-12:50 0.33 0.25 WHIP WHIP P P WEXIT WEXIT 12:50 - 13:10 I 0.331 WHIP I P I I WEXIT 13:10-13:451 0.581WHIP IP I (WEXIT 13:45 - 14:30 0.75 WHIP N WAIT (WEXIT 14:30 - 15:30 1.00 WHIP N I 15:30 - 15:35 0.08 WHIP N WEXIT 15:35 - 16:00 0.42 WHIP P WEXIT 16:00-19:351 3.58WHIP P (WEXIT 19:35-20:15 0.67 WHIP P WEXIT 20:15 - 20:25 0.17 PXA P WEXIT 20:25 - 00:00 3.58 PXA P WEXIT 4/18/2006 00:00 - 00:15 0.25 PXA P WEXIT 00:15 - 00:30 0.25 PXA P WEXIT 00:30 - 02:25 1.92 PXA P WEXIT 02:25 - 03:10 ~ 0.751 PXA I P I W EXIT 03:10 - 04:30 I 1.331 PXA I P I I W EXIT 04:30 - 04:50 I 0.331 PXA I P I I W EXIT 04:50 - 05:20 ~ 0.501 PXA P ~ W EXIT 05:20 - 08:00 I 2.67 I PXA I P I I W EXIT Page 3 of 14 ~ Spud Date: End: Description of Operations to 20L. Circ @ 2.50/2.18bpm & 4300 psi for 4mins to arm the FAIV. Drop pump to Obpm. Wait 4mins. Bring on pump to 1.6bpm, & did not shear off WS. Continue pumping & observe TF of 9L. Repeat process. Circ C~ 2.57/2.19bpm & 4400 psi for 4mins to arm the FAIV. Trip pumps 3x ~ 2.7bpm/4900psi. Drop pump to Obpm. Wait 8mins. Bring on pump to 1.6bpm, & did not shear off WS. Continue pumping & observe TF of 8R. Orient TF around to 20L. Meanwhile call for cement truck & double-slick brine to set WS. W. O. cement truck and/or double-slick brine to set WS. Fill coil with double-slick brine & observe 300psi drop in CTP. Meanwhile R/U SLB cementers & hold PJSM for possible hi-pressure pumping. By-pass MM-in. P/test cmt lines to 6000psi - OK. Isolate rig pumps. Circ with cmt pump ~ 3.32/2.45bpm & 5400 psi for 4mins to arm the FAIV. Drop pump to Obpm. Wait 6mins. Isolate cmt pump. Line-up MM-in. Bring on rig pump to 1.6bpm, pressure up & shear off WS @ 3100psi. Continue pumping & observe TF of 3R. S/D pumps. Set down 2k ~ 18258.7' - WS held. Vac out cmt lines. POOH WS setting BHA#2 filling the hole via the CT ~ 0.95bpm/560psi. Paint EOP flag @ 18000'. POH w/ BHA #2, LD MWD tools and WS setting tool PU cementing BHA #3 RIH w/ cementing BHA #3, tagged WS at 18240', PU to 18200' Establish Injection Rates w/ 9.4 ppg brine aY .58 bpm - 320 psi, 1.07 bpm - 392 psi, 1.6 bpm - 460 psi, 2.05 bpm - 494 psi, 2.53 bpm - 505 psi, 3.10 bpm - 546 psi, RU cementers, PVT - 256 bbls, IA - 925 psi, OA - 161 psi PJSM on cement job Pump cement job as follows: pumped 5 bbls of FW, test lines to 4000 psi, 37 bbls of 15.8 ppg CL "G" neat cement slurry at 2.5 - 1.75 bpm, 2175 - 800 psi, displace cement w/ 4.5 bbls of FW, shut in well at choke, switch over to rig pumps, pump 9.4 ppg 2 ppb biozan brine, bullhead into formation at 2.39 bpm - 350 psi, pressure increased to 415 psi after 33 bbls pumped, slowed rate to 1.25 bpm w/ 300 - 250 psi, pressure increased to 750 psi w/ 56 bbls pumped, open choke maintaining 750 psi WHP, POH, laying in remaining cmt 1:1, pumped 85 bbls. OOH at 16177' w/ Est TOC at -16645' Circ while holding squeeze pressure of 1250 psi at .41 bpm in/out, 1000 psi over inj WHP, monitoring in/out volumes, PVT at 298 bbls, IA at 2150 psi, OA at 325 psi Pump 9.4 KCUNACL ppg w/ 2 ppb biozan, RIH, washing down to 18240' w / 2.60 bpm 2100 psi, 500psi WHP, 1:1 returns, released WHP, opened choke PUH to 17000' while pumping at 2.25 bpm, 1350 psi w/ 1:1 returns RIH, washing down w/ 9.4 ppg Brine w/ 2 ppb Biozan to 18240' at 2.73/ 3.00 bpm 2289 psi, 1:1 returns POH to BHA while pumping at 2.85 bpm, 2550 psi w/ 1:1 returns w/ cement contaminated brine. Printed: 5/6/2006 11:56:25 AM BP EXPLORATION Operations Summary Report Page 4 of 14 Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To !Hours ! Task ~ Code i NPT ~ Phase ~ Description of Operations 4/18/2006 08:00 - 09:30 ~ 1.501 PXA I N WAIT ~ W EXIT 09:30 - 11:00 1.50 PXA P 11:00 - 11:15 0.25 PXA P 11:15 - 11:30 0.25 PXA P 11:30 - 12:00 0.50 STWHIP P 12:00 - 16:10 I 4.171 STWHIPI P 16:10 - 16:30 I 0.331 STWHIPI P 16:30 - 00:00 I 7.501 STW H I P I P 4/19/2006 100:00 - 01:00 01:00 - 05:00 05:00 - 05:30 05:30 - 10:30 1.00 STWHIP P 4.00 STWHIP N 0.50 STWHIP N 5.00 STWHIP N 10:30 - 10:40 10:40 - 14:20 WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT DPRB WEXIT DPRB WEXIT DPRB WEXIT 0.17 STWHIP N DPRB WEXIT 3.67 STWHIP N DPRB WEXIT 14:20 - 17:00 2.67 STWHIP N DPRB WEXIT 17:00 - 20:30 3.50 STWHIP N DPRB WEXIT 20:30 - 21:00 0.50 STWHIP N DPRB WEXIT 21:00 - 00:00 3.00 STWHIP N DPRB WEXIT 4/20/2006 00:00-00:15 0.25 STWHIP N DPRB WEXIT 00:15-01:00 0.75 STWHIP N DPRB WEXIT 01:00 - 04:30 3.50 STWHIP N DPRB WEXIT 04:30 - 04:50 0.33 STWHIP N DPRB WEXIT 04:45 -10:15 1 5.501 STWHIPI N (DPRB (WEXIT Pit levels low. Park bit ~ 9000' & W.O. additional bio-brine to arrive onsite. Continue POOH nozzle BHA circ out dirty fluid. OOH. S/B injector& UD nozzle BHA. M/U swizzle stick. Stab on injector & jet BOP stack. Flush surface lines. S/B injector & UD swizzle stick. M/U window milling BHA #4 with a 3.80" HC DP0261 DW M, 3.79" diamond string reamer, Baker Xtreme motor, MHA & 2 jts of PH6 tbg (OAL - 84.70'). M/U injector. RIH window milling BHA #4,. correct back to EOP at 18000' w/ -13.6' correct, RIH to 18223', up wt 62 k, do wt 5 k, FS 1850 psi at 2.7 bpm, PVT 260 bbls Dlg cmt f/ 18223' - 18233' w/ 2.68 bpm, 2125 psi. PU to 18215', est FS w/ 2.69 bpm 1690 psi, RBIH, Drlg cmt f/ 18233' - 18244' Tag and stall .Mill window per time schedule 2.74/2.78 BPM ~ 1975 psi. -(1-2) K surface wt while milling. Mill to 18248.8 .Up Wt 58K,2.7 bpm 2234 psi, FS = 2100 psi. Retag at 18245'. Continue attempting to mill getting motor work but no drill off. Decided to POH to check BHA. POH. LD milling BHA #1 and PU new mill and motor. Consult w/ Anchorage office and Baker, decided to run a 3.70" Crayola Mill, wait on mill from Baker, C/O motor while waiting on mill MU 3.70" Crayola Mill to BHA #5 RIH w/ Crayola Mill BHA to 18245', correction on btm -14.4', PU Wt 60 K, SO Wt 10.5 K at 18000', FS 2850 psi at 2.71 bpm, PVT 252 bbls, IA - 1168 psi, OA 189 psi, Note: crew performed and reviewed parted pipe drill. Attempt to Milting at 18245', 2.71 bpm w/ 3018 psi, UP Wt 60 K, Dn Wt 4.4 K, several stalls, time milling at 18243', no progress made POH to BHA Replace cutrite Crayola mill with diamond speed mill w/o string mill. Crayola mill had no noticable wear but the bit box on the motor was polished. This new assy will put the bit box 6.5" deaper in well moving the contact area to the motor housing. RIH RIH tag at 18267.4 un corrected PU RIH tag 18258 uncorrected seeing motor work. 2.66/2.7 bpm @ 3135 psi, 2800 psi FS. Time milled to 18259. RIH. Stall 18261.1 PU 6K over pull. Stuck! attempting to go up but able to go down OK. Pulled 20K over. Popped free. Temporaraly dragging junk 10-15'. Call Town decided to POH for memory log and second WS. POH LD motor and mill. Mill in new condition. The mill shank, bit box and 2+" of the motor housing had serial gouges. Wait on Memory CCUGR Logger. Performed Rig Evacuation Drill Printed: 5/8/2006 11:56:25 AM ti • BP EXPLORATION Page 5 of 14 ~ Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ;From - To ~ NPT Phase Description of Operations Hours Task Code ~,, i 4/20/2006 04:45 - 10:15 5.50 STWHIP N DPRB WEXIT 10:15 - 10:30 0.25 STWHIP N DPRB WEXIT Held PJSM on RU and Handling procedures on logging tools 10:30 - 11:00 0.50 STWHIP N DPRB WEXIT MU Memory GR-CCL w/ nozzle, 1 jt -2 3/8" PH6 tbg MHA = 11:00 - 14:00 3.00 STWHIP N DPRB WEXIT 14:00 - 14:40 0.67 STWHIP N DPRB WEXIT 14:40 - 15:10 0.50 STWHIP N DPRB WEXIT 15:10 - 17:00 1.83 STWHIP N DPRB WEXIT 17:00 - 21:00 4.00 STWHIP N DPRB WEXIT 21:00 - 00:00 3.00 STWHIP N DPRB WEXIT 4/21/2006 00:00 - 00:15 0.25 STWHIP N DPRB WEXIT 00:15-03:15 3.00 STWHIP N DPRB WEXIT 03:15-03:45 0:50 STWHIP N DPRB WEXIT 03:45-04:15 0.50 STWHIP N DPRB WEXIT 04:15 - 07:40 3.42 STWHIP N DPRB WEXIT 07:40 - 08:40 1.00 STWHIP N DPRB WEXIT 08:40 - 09:10 0.50 STWHIP N DPRB WEXIT 09:10 - 13:00 3.83 STWHIP N DPRB WEXIT 13:00 - 15:00 2.00 STWHIP N DPRB WEXIT 15:00 - 15:10 0.17 STWHIP N DPRB WEXIT 15:10-15:20 0.17 STWHIP N DPRB WEXIT 15:20 - 18:00 2.67 STWHIP N DPRB WEXIT 18:00-22:15 4.25 STWHIP N DPRB WEXIT 22:15 - 00:00 1.75 STWHIP N DPRB WEXIT 4/22/2006 100:00 - 06:00 6.00 ~ STWHIP N I DPRB WEXIT 06:00 - 09:50 I 3.831 STWHIPI N I DPRB I WEXIT 60.69' RIH w/ Logging BHA to 17500' Log do f/ 17500 to btm at 18269.5' at 30 fpm, .25 bpm, depth uncorrected, Painted EOP flag at 18208' Log up f/ 18269.5' to 17500' at 30 fpm, .25 bpm POH to BHA LD memory tools. Unable to read data files. Send for replacement interface box from SLb at Nordic2. Unable to down load. Appears the internal battery failed. Will change out memory sonde and rerun log. MU Memory Tool for run #2. RIH to 17500'. Log down to top of flag EOP 18208'. ~ 30 fUmin. Dn WT 8K. Tag TD up to get wt back 58K. Log up at 30 fUmin. to 17500. Paint Flag at 17400 EOP. POH to BHA POH w/ BHA, LD Memory GR-CCL tools, download tool, no GR detection, was able to correlate CCL to a jewelry log "SLB Production Profile" dated 7-Jun-2001 MU 6.101" DB Underreamer, 2 jts of 2 3/8" PH6 tbg, and MHA, Stab Inj, BHA Length = 87.72' RIH w/ Underreamer BHA, correction at EOP -4.3', Rlh to 18000', PU, verified Tbg Tail at 17987', RIH to 18163', Up Wt 58 k, Dn Wt 5.3 k, PVT 235 bbls Underreaming f/ 18163' - 18233', 2.70 bpm w/ 3175 psi, first sign of mtr work at 18168', mtr stalled, continued underreaming to 18233.4', mtr stalled, attempt to work past for last 45 minutes, no progress Shut down pumps, collaspe underreamer blades, PU to 18200', RIH past 18233.4', noticed slight 1k bobble, RIH to 18255.8', taking weight, PU to 18185', had 4 k overpull ,RIH to 18235' Backream f/ 18235' w/ 1.61 bpm at 3300 psi, PUH to PU Wt, blades fully extended pressure fell off. RIH to 18233', underreaming f/ 18233' - 18240' w/ 2.74 bpm at 3425 psi, ROP at 6 fph, periodically stalling Continue reaming 2.7 / 2.7 bpm 3380 psi, FS = 3000 psi. 2-3K WOB. ROP 6 fUhr. Periodic stalling. Ream to 18242.8. Pressure increasing 3340 spi @ 2.4 bpm. RIH w/o pump tag at 18248'. PU to17960 thru tail pipe with out pump knives closed went thru tailpipe no problem. Restablish FS at 2.7 bpm ~ 3010 psi. Pressure back to normal. RIH Underream 2.7 bpm @ 3350psi frequent stalling slow ROP. Continue underreaming 3460 psi ~ 2.74 bpm , FS=3300 psi. Numerous hard stalls. PU and RIH w/o pump tag at 18248. Resume underreaming 2.6 bpm 3040 psi. ream to 18249. ROP 1 fUhr. Underreaming f/ 18249' to 18251' w/ 2.6 bpm 3040 psi. Limited progress since 07:30 hr, continued w/ several hard stalls. Punted: 5/8/2006 11:56:25 AM ~ • BP EXPLORATION Operations Summary Report Page 6 of 14 Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: ell Name: e: Name: `From - To ~ I NK-14 NK-14 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E i NPT Start Rig Rig ~ L Phase I Spud Date: : 4/10/2006 End: Release: Number: N1 Description of Operations 4/22/2006 09:50 - 10:30 0.67 - - STWHIP N - DPRB I WEXIT Drop 3/4" sleet ball, Clrc ball down w/ 9.0 ppg double slick brine, open circ sub 10:30 - 14:00 3.50 STWHIP N DPRB WEXIT POH to BHA while displacing well to 9.0 ppg double slick 2% KCUNaCL brine 14:00 - 14:15 0.25 STWHIP N DPRB WEXIT POH w/ BHA, LD mill, underreamer, mtr, MHA, underreamer under gauged. Arms gaged 5" in shop. 14:15 - 15:30 1.25 BOPSU N DPRB WEXIT Blow back CT, Function Test BOPe's, Rig electrician Troubleshoot SCR's, pump rate and pressure still fluctuate sporadically while circ 15:30 - 16:30 1.00 STWHIP N DPRB WEXIT Cut off CTC, Cut 200' of CT, Install Baker CTC, pull and pressure tested 16:30 - 17:00 0.50 STWHIP N DPRB WEXIT PJSM on handling logging tools, load pipeshed with tools 17:00 - 17:40 0.67 STWHIP N DPRB WEXIT MU caliper-ccl-gr tools, 2 jts of 2 3/8" PH6, and MHA = 98.6' 17:40 - 20:28 2.80 STWHIP N DPRB WEXIT RIH w/ Caliper-CCL-GR BHA. RIH to 17500'.0? 105 Wmin. 20:28 - 21:00 0.53 STWHIP N DPRB WEXIT Log down from 17500 to TD at 40 ft/min. Need to be on bottom 20:50 at which time the caliper arms are timed to open. RIH 42 fUmin. Stop 18258 20:50HRS. 21:00 - 21:25 0.42 STWHIP N DPRB WEXIT Log up 50 ft/min. Caliper arms programmed to close at 21:13 hrs. C~ 17500'.STOPPED. Flag EOP 17400'. 21:25 - 00:00 2.58 STWHIP N DPRB WEXIT POH. 4/23/2006 00:00 - 01:00 1.00 STWHIP N DPRB WEXIT Continue to POH. 01:00 - 01:30 0.50 STWHIP N DPRB WEXIT LD BHA 01:30 - 04:30 3.00 STWHIP N DPRB WEXIT Process log data. Determine TD ~ 18242 corrected. Caliper log data somewhat compromised approximately 1/3 of the arms (lowside) were prevented from opening due to debris (metal filings). However suffient data exists over a consistent 170 degree interval that suggest we have full gauge casing at 18233 slip setting interval placing top of WS at 18216. The under gage under reamer blades are explainable based on the extremely hard reaming the last 11' taking 15.8 hours. Consult with anch Engr agreed to set second WS. 04:30 - 05:30 1.00 STWHIP N DPRB WEXIT MU second WS BHA == 71.43' 05:30 - 06:40 1.17 STWHIP N DPRB WEXIT Wait on arrival of RA tags. 06:40 - 07:00 0.33 STWHIP N DPRB WEXIT PJSM installing RA tags, Installed 2 RA tags 10' down from top of W S 07:00 - 11:25 4.42 STWHIP N DPRB WEXIT RIH w/ WS Assy to 18180', EOP Flag correction of -12.1' 11:25 - 12:30 1.08 STWHIP N DPRB WEXIT Log do f/ 18180' at 60fph w/ 1.63 bpm at 1703 psi, tie-in to Geology PDC log for WS setting depth, correction of -13', PU Wt 58K, SO Wt 8K, Position btm of WS at 18233', top of WS at 18216.5' 12:30 - 13:40 1.17 STWHIP N DPRB WEXIT Cycle pumps to oreint WS, Repair gasket rubber on steel line, cycle pumps, oriented to 29 LOH, cycle pump for last position to 4900 psi, bled pressure down to 0 psi, pressured up to 3300 psi, pressure dropped off to 2200 psi, set WS at 18216.5', 12 LH, verified WS was set by stacking 2 K S/O wt , WS set at 18233' 13:40 - 16:25 2.75 STWHIP N DPRB WEXIT POH to BHA 16:25 - 17:05 0.67 STWHIP N DPRB WEXIT POH w/ BHA, LD MWD tools, Baker R/T 17:05 - 17:15 0.17 STWHIP N DPRB WEXIT MU cmt nozzle assy = 9.85' 17:15 - 20:30 3.25 STWHIP N DPRB WEXIT RIH w/ cmt nozzle assy. tag at 18241 corrected to 18221. 20:30 - 21:00 0.50 STWHIP N DPRB WEXIT PJSM for cement job. Jet Whipstock 3.8 bpm C 3650 psi, while RU cementers. 21:00 - 21:50 0.83 STWHIP N DPRB WEXIT Pump 3 BBL H2O. PT to 4000 psi OK.Pump 8.3 bbl 15.8 Printed: 5/S/2006 11:56:25 AM • BP EXPLORATION Page 7 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date I. From - To Hours Task ~ Code NPT Phase i Description of Operations 14/23/2006 ~ 21:00 - 21:50 0.83 STWHIP'~ N I DPRB WEXIT 21:50 - 22:30 I 0.671 STWHIPI N I DPRB I WEXIT 22:30-23:301 1.OOISTWHIPIN (DPRB (WEXIT 23:30-00:00 0.50 STWHIP N DPRB WEXIT 4/24/2006 00:00-02:45 2.75 STWHIP N DPRB WEXIT 02:45-03:30 0.75 STWHIP N DPRB WEXIT 03:30-04:00 0.50 STWHIP N DPRB WEXIT 04:00-07:30 3.50 STWHIP N DPRB WEXIT 07:30-11:101 3.671STWHIPIP I (WEXIT 11:10-12:45 I 1.581STWHIPIP I (WEXIT 12:45-16:00 3.25 STWHIP P WEXIT 16:00-16:45 .0.75 STWHIP P WEXIT 16:45 - 18:00 I 1.251 DRILL I P I I PROD1 18:00 - 22:00 4.00 DRILL P PROD1 22:00 - 00:00 2.00 DRILL N RREP PROD1 4/25/2006 00:00 - 00:40 0.67 DRILL P PROD1 00:40 - 02:30 1.83 DRILL P PROD1 02:30 - 05:00 I 2.501 DRILL I P I I PROD1 05:00 - 06:30 1.50 DRILL P PROD1 06:30 - 06:45 0.25 DRILL P PROD1 06:45 - 07:05 I 0.331 DRILL I P I I PROD1 07:05 - 09:10 I 2.081 DRILL I P I I PROD1 09:10 - 09:35 I 0.421 DRILL I P I I PROD1 cement and 3 bbl H2O. Shut down and swap to rig pump. Displace with KCL 3.46 / 3.46 bpm ~ 2900 psi. PT 301 bbl. Lay in cement 1:1. PU to 17750. Pressure to 1000 psi IA rose to 1800 psi from 850 psi. Shut in and hold for 30 min. Lost 55 psi in 30 min. Pump 32 bbl 2# bio and wash down to pinch point at 27 fpm, circulating 3 bpm ~ 2220 psi. PT 301 bbl POH Continue to POH. PU nozzel and jet stack. MU Milling BHA. RIH with window milling BHA, tagged WS at 18238' uncorrected, PU WT 58k, SO Wt 6k, Pump rate at 2.75 bpm w/ 1630 psi, corrected depth to top of WS at 18215.5, offloaded 200 bbls of 9.0 ppg double slick brine w/ 2 ppb Biozan in pits Est Pinch point 18219', Tag and stall window mill at pinch point 2x's, Time milled window f/ 18219' - 18226' w/ 2.66 BPM ~ 1625 psi, WOM - 0-1 K milling window, drill formation f/ 18226' - 18237', 1-2 K drilling formation, Up Wt 58K, 2.7 bpm 1850 psi FS Wash and ream f/ 18237' thru window and 7" csg in tbg tail to 17900', several times at 2.7 bpm 1480 psi, no problems. Btms up sample confirm formation sand, metal and scale particals in returns, recovered very little metal thru out window milling operations, a few strands over the shakers and attached to magnets. POH to Milling BHA POH LD Milling BHA, MHA, starter mill slightly undergaged f/ 3.80" to 3.79" MU Drlg BHA w/ Baker 3 3/4" x 4 1/8" BiCenter Bit, 2.7 deg mtr, MWD-GR, SLB MHA, C/O to SLB CTC, Pull and pressure test, stab injector RIH. Shut down to repair SCR replaced Generator Mother Board. Orient to 52L RIH Tag at 18261 and correct to 18239. Direcrionally drill 2.75 / 2.75 BPM at 2549 psi. While srapping to Flo Pro.21. Circulation pressure with new FloPro at bit = 3550 psi ~ 2.63 bpm. Attempt to orient. Unable to orient on or off bottom. Fluid interface came back 150 bbl Iate.Swapping IA fluids due to leaking tubing. !A volume 960 bbls. Circulating pressure when FloPro back to surface = psi, PU above window to 18140', orient TF around to 170L, RIH to btm, TF at 15R, want TF at 90 L, PU to 18228', orient around to 114L, RIH to btm, TF at 86L Directionally drill 2.37 / 2.10 BPM at 3450 psi, TF at 86L, FS 3100 psi, PVT 157 bbls, IA 1454 psi, OA 315 psi, TF rolled to 56 L PU to 18228', Orient TF around to 165 R, RIH to btm, TF at 100 L Directionally drill 2.44 / 1.85 BPM at 3750 psi, TF at 100 - 80 L, PVT 147 bbls, IA 1447 psi, OA 325 psi PU to 18228', Orient around to 159 L, RIH to Btm , TF at 86 L Printed: 5/8/2006 11:56:25 AM 4 BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date -- - Name: ell Name: e: Name: From - To ~ NK-14 NK-14 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT Start Rig Rig Phase Spud Date: : 4/10/2006 End: Release: Number: N1 Description of Operations -- 4/25/2006 09:35 - 09:45 0.17 DRILL P PROD1 Directionally drill 2.44 / 1.95 BPM at 3750 psi, TF at 90 L, PVT 147 bbls, IA 1447 psi, OA 325 psi, PVT 119 bbls, Offloading Vac Trk w/ 290 bbls of 9.0 ppg Flo-Pro mud into pits 09:45 - 09:55 0.17 DRILL P PROD1 PU to 18228', Oriented 1 click f/ 170 L to 142 L, RIH to btm, TF 75 L 09:55 - 11:00 1.08 DRILL P PROD1 Drlg w! 2.55/2.26 bpm, 3600 - 3900 psi, TF 75 - 80 L, PVT 285 bbls, IA 1450 psi, OA 315 psi, ROP 115 fph, losing - 30 BPH to well 11:00 - 11:15 0.25 DRILL P PROD1 POH to 18200', run tie-in pass to RA tag 11:15 - 12:45 1.50 DRILL P PROD1 Tie-in pass f/ 18200' 12:45 - 15:30 2.75 DRILL P PROD1 POH 15:30 - 17:45 2.25 DRILL P PROD1 LD build assembly and PU 1.2 degree lateral assembly with restivity tool. 17:45 - 18:15 0.50 DRILL P PROD1 RIH to 1900' Shallow hole test . Orienter failed. 18:15 - 18:40 0.42 DRILL N DFAL PROD1 POH Orienter failure. 18:40 - 19:20 0.67 DRILL N DFAL PROD1 C/O orienter, adjust motor to 1.0 deg and check scribe offset. OAL = 91.1'. 19:20 - 20:00 0.67 DRILL N DFAL PROD1 RIH with lateral MWD /RES BHA #15 with 1.0 deg motor and new HCC BC Bit. SHT orienter OK. 20:00 - 22:45 2.75 DRILL P PROD1 Continue RIH. Full returns. 22:45 - 00:00 1.25 DRILL P PROD1 Log GR tie-in above window at 18,160'. -23 ft CTD. 4/26/2006 00:00 - 00:30 0.50 DRILL P PROD1 RIH clean to bottom. Tag at 18,540'. 10 BPH mud loss on bottom. 2.8/2.6 BPM. 00:30 - 01:30 1.00 DRILL N DFAL PROD1 Attempt to log RES MAD pass from bottom up to window. No pulses below 18340'. Tool in a bind due to higher DLS in build section. 01:30 - 02:00 0.50 DRILL P PRODi Drill 10 ft blind to see if we can get pulses on bottom. Started getting pulses after 10'. Try to orient on bottom. No luck. 02:00 - 02:30 0.50 DRILL P PROD1 Pull to just below window and orient 11 clicks. RIH to bottom. Had pulses all the way to bottom for the first time. 02:30 - 03:30 1.00 DRILL P PROD1 Drilled Lateral in Kuparuk sand, 2.5 / 2.2 bpm; 3600-4000 psi, 124L, 70 fph, 95 deg incl, Drilled to 18,610'. 03:30 - 03:40 0.17 DRILL P PRODi Orient TF to 90L. 03:40 - 05:30 1.83 DRILL P PRODi Drilled Lateral in Kuparuk sand, 2.5 / 2.2 bpm, 3600-4000 psi, 90L, 70 fph, 93 deg incl, Mud loss of 15 BPH. Drilled to 18,700'. 05:30 - 06:45 1.25 DRILL P PROD1 Log RES / GR MAD pass up to window, 300 FPH. 2.7 / 2.5 bpm, 3900 psi. 06:45 - 07:00 0.25 DRILL P PRODi RIH 2.6/2.55 bpm ~ 3700 psi. 07:00 - 08:40 1.67 DRILL P PROD1 Directionally drill 2.56/2.32 bpm ~ 3770 psi .surface wt 7-8K. ROP 80 PT 228 ~ 07:00. Drill to 18850'. 08:40 - 10:10 1.50 DRILL P PROD1 W iper to tailpipe. Orient 10R thru window. 2.55 bpm @ 3560 psi.FS, RIH to 18842 and Orient to 95L. 10:10 - 12:30 2.33 DRILL P PROD1 Directionally drill 2.66/2.42 bpm @ 4200 psi . FS = 3600 psi. Surface wt 5-6K. ROP 119 PT 188 ~ 10:00. Drill to 19000'. 12:30 - 13:15 0.75 DRILL P PROD1 Wiper to window. 2.63 bpm ~ 3600 psi Up Wt 39K. DW Wt 8K. Add volume to pits. 13:15 - 14:45 1.50 DRILL P PROD1 PT = 304. Directionally drill 2.58/2.44 bpm ~ 4100 psi . FS = 3600 psi. Surface wt 6-5 K. ROP 123. 105L. Drill to 19150'.Loss rate 8 bbl /hr. 14:45 - 15:20 0.58 DRILL P PROD1 W iper to window to 18310'. 15:20 - 16:00 0.67 DRILL P PROD1 Tie-in Correction +7' Printed: 5/6/2006 11:56:25 AM BP EXPLORATION Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT 4/26/2006 16:00 - 16:30 0.50 DRILL P 16:30 - 18:00 1.50 DRILL P 18:00 - 19:50 1.83 DRILL P 19:50 - 20:15 0.42 DRILL P 20:15 - 22:30 2.25 DRILL P 22:30 - 23:50 1.33 DRILL P 23:50 - 00:00 0.17 DRILL P 4/27/2006 100:00 - 01:20 I 1.331 DRILL I P 01:20 - 01:30 0.17 DRILL P 01:30 - 02:00 0.50 DRILL P Page 9 of 14 Spud Date: Start: 4/10/2006 End: Rig Release: Rig Number: N1 Phase Description of Operations PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 PRODi PROD1 PROD1 02:00 - 02:45 0.75 DRILL P PROD1 02:45 - 03:15 0.50 DRILL P PRODi 03:15 - 04:00 0.75 DRILL P PROD1 04:00 - 04:15 0.25 DRILL P PROD1 04:15 - 04:45 0.50 DRILL P PROD1 04:45 - 06:30 1.75 DRILL P PROD1 06:30 - 08:30 2.00 DRILL P PROD1 08:30 - 12:30 4.00 DRILL P PROD1 12:30 - 14:10 1.67 DRILL P PROD1 14:10 - 14:30 0.33 DRILL P PROD1 14:30 - 18:15 3.75 DRILL P PROD1 18:15 - 19:15 1.00 DRILL P PROD1 19:15 - 20:00 0.75 DRILL P PROD1 20:00 - 21:00 1.00 DRILL P PROD1 21:00 - 23:00 2.00 DRILL P PROD1 23:00 - 23:40 I 0.671 DRILL I P I I PROD1 23:40 - 23:55 ~ 0.25 ~ DRILL ~ P ~ ~ PROD1 RIH to 19150'. PT = 280 Orient 80R .Directionally drill 2.63/2.44 bpm ~ 4100 psi . FS = 3600 psi. Surface wt 6 K. ROP 101. Fluid loss of 8 BPH. Drilled to 19300'. Wiper trip to tailpipe at 17,980'. Clean trip. RIH clean to bottom. Orient TF to 80R. Drilled lateral, 2.5 / 2.3 bpm, 3500-4000 psi, 90R, 80 FPH, 8 bph fluid loss, 94 deg incl, Drilled to 19,450'. Wiper trip to window. Clean trip. RIH clean to bottom: 2.7 bpm, 3950 psi. Drilled lateral, 2.5 / 2.3 bpm, 3500-4000 psi, 100R, 90 FPH, 8 bph fluid loss, 93 deg incl, Drilled to 19,464'. Drilled lateral, 2.5 / 2.4 bpm, 3500-4000 psi, 110R, 92 deg incl, 100 fph, stacking full wt. New FloPro is ordered. Drilled to 19563'. Orient TF to 150L. Drilled lateral, 2.5 / 2.4 bpm, 3500-4000 psi, 130L, 93 deg incl, 100 fph, stacking full wt. Drilled to 19,600'. Wiper trip to window. Clean trip. Log GR tie-in at window. Added 11 ft to CTD. RIH clean to bottom. Tagged at 19604'. Drilled lateral, 2.4 / 2.4 bpm, 3600-4200 psi, 80L, 90 deg incl, 100 fph, stacking full wt. Drilled to 19,636'. Orient TF around to 110L. Drilled lateral, 2.4 / 2.4 bpm, 3600-4200 psi, 100L, 90 deg incl, 100 fph, stacking full wt. Drilled to 19,750'. Wiper trip to tailpipe. Begin mud swap. Directionally drill 2.53 / 2.54 blm @ 4000 psi. FS = 3700 psi. Reactive torque erradic 20 to 180 degrees making orienting difficult. Continue drilling 2.47 / 2.39 bpm 4000 psi. NOTE the interface on the mud swap once again arrived 150+ bbl late. Effectively 2800' of the IA is part of the active system due to extensive holes in tubing. Wiper to window. Clean trip. Orient 134E Directionally drill 2.50 / 2.40 bpm C~3 3875 psi. FS = 3700 psi. Surface wt 3K.ROP 80. formation change?? at 19980 shift in restivity. Continue to drill to 20050'. having some difficulty sliding. Wiper to TP. Clean hole. Full returns. Log GR tie-in at window. 33K up wt. Added 15' CTD. RIH clean to bottom. Tag bottom at 20,058'. Drilled lateral, 2.5/2.5 bpm, 3600-4100 psi, 120L, 81 deg incl, not sliding, stacking wt, more stalls. Not able to drill further. Drilled to 20,098'. Short wiper trip up to 19,700' while circulating new FloPro to bit. See if we can drill with new FloPro in open hole for better slide. Coil capacity = 84 bbls. Down wt off bottom = 7K. Up wt = 39K. Drilled with new mud in open hole. 2.5 / 2.5 bpm, 3600-4100 psi, Still not sliding. Several stalls. Drilled to 20,100'. Wearing out coil with many stalls. ---_ Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 10 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To j Hours j Task Code 4/27/2006 23:55 - 00:00 0.08 DRILL P 4/28/2006 00:00 - 04:10 4.17. DRILL P 04:10 - 06:00 1.83 DRILL P 06:00 - 11:30 5.50 BOPSU P Start: Rig Release: Rig Number: NPT I Phase PROD1 PROD1 PROD1 PROD1 11:30 - 13:30 2.00 DRILL P PROD1 13:30 - 16:00 2.50 DRILL P PROD1 16:00 - 19:20 3.33 DRILL P PROD1 19:20 - 19:50 0.50 DRILL P PROD1 19:50 - 20:40 0.83 DRILL P PROD1 20:40 - 21:00 0.33 DRILL P PROD1 21:00 - 22:30 1.50 DRILL P PROD1 22:30 - 00:00 I 1.501 DRILL I P I I PROD1 14/29/2006 100:00 - 01:15 ~ 1.251 DRILL ~ P ~ ~ PROD1 01:15 - 03:15 2.00 DRILL P PROD1 03:15 - 03:45 0.50 DRILL P PROD1 03:45 - 05:00 1.25 DRILL P PROD1 05:00 - 06:30 I 1.501 DRILL P PROD1 06:30 - 06:45 0.25 DRILL P PROD1 06:45 - 10:00 3.25 DRILL P PROD1 10:30 - 12:10 0.671 DRILL P PROD1 12:10 - 14:15 2.08 DRILL P PROD1 14:15 - 16:00 1.75 DRILL P PROD1 16:00 - 20:00 4.00 DRILL P PROD1 20:00 - 00:00 4.00 DRILL P PROD1 4/30/2006 00:00 - 00:30 0.50 DRILL P PROD1 00:30 - 04:00 3.50 DRILL P PROD1 04:00 - 04:30 0.50 DRILL P PROD1 04:30 - 05:45 1.25 DRILL P PROD1 Spud Date: 4/10/2006 End: N1 Description of Operations POH to check BHA and pick up agitator. POH to check BHA. Pump all the way to surface. UO BHA. Bit was gradded at 1,4,1. Download RES data. Pressure /function test BOPE. 14 day test. No failures. Send Test report to AOGCC. Witnessed By Bob Laule BP Well Site supervisor. Witnessing waived by AOGCC's Lou Gramaldi. Prep and install Baker coil connector. Pull test and Pressure test. PT inner reel valve. MU BHA ldegree motor, MWD, Restivity, with agitator and 4 joints PH6. BHA = 221.34' RIH. Shallow hole test at 2000'. O.K. RIH. Log GR tie-in above window. -25' CTD. RIH clean to bottom. Tag at 20,101'. Orient TF to 120L. Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3800-4200 psi, 135L, 81 deg incl, 50 fph, Good wt transfer with agitator, higher pump press, drilling with +5K injecter wt. Drilled to 20140'. Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3800-4200 psi, 135L, 80 deg incl, 50 fph, drilling with +5K injecter wt. Drilled to 20,198'. Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3600-4300 psi, 78 deg incl, 40 fph, Drilled to 20,220'. Stacking wt. Wiper trip to window. Clean hole. RIH clean to bottom. Orient TF to right side. Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3700-4300 psi, 160R, 77 deg incl, 20 fph, Stacking wt, several stalls, Very slow progress. Drilled to 20,245'. Trying to drill ahead. Pump 70 bbls new FloPro to bit, time drill at 20 fph, very little motor work, and light WOB, 2.3 / 2.3 bpm, 3700-4300 psi, 160R, 76 deg incl. Drilled to 20,270'. Orient 104R. Directionally drill 2.32 / 2.32 bpm ~ 4130 psi. 6K surface wt, FS = 3820 psi. Drill to 20320' Orient to 57R. Directionally drill 2.32/ 2.30 bpm @ 4080 psi. Surface wt 8K,ROP 23,INC 68. Wiper to tailpipe. Directionally drill 2.25/ 2.25 bpm ~ 3900 psi. FS = 3720 psi. / Surface wt 8K,ROP 15-20, INC 67. Drilled to 20380'. Decided to POH to look at BHA. ROP decreasing with a step change at 20350'. Still good weight transfer 8K surface wt. Motor Stall with little weight. POH, circ while POH to surface. Lay out BHA. Found motor was losing rubber, bit had 2 plugged ports, C/O motor and M/U new 1.0 Deg motor, re-run bit, found one very small pinhole in Sperry RES tool body [1/32"]. Download RES data. C/O RES tool. C/O BOT MHA. Press test CTC. Continue with BHA swap. RIH with Agitator /RES BHA with 1.0 deg motor to Tie-in point. Tie-in correction -26.5.' RIH and tag bottom at 20,354'. Printed: 5/8/2006 71:56:25 AM 4 • BP EXPLORATION Page 11 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To ~, Hours Task i Code i NPT Phase ~ Description of Operations 4/30/2006 05:45 - 06:00 0.25 DRILL P PROD1 Orient to 80R. 06:00 - 07:35 1.58 DRILL P PROD1 Directionally drill 2.3 bpm @ 4100-3700 psi, FS = 3650. Drill to 20,432. PU to orient. Stuck at 20,425' 07:35 - 07:50 0.25 DRILL N STUC PROD1 Pull up to 76K, Slack off to -10K and shut down pump. wait. Call for crude. Work pipe and pop free. 07:50 - 08:15 0.42 DRILL P PROD1 Drill to 20,446' Pu to orient. Pull 65K. 08:15 - 08:25 0.17 DRILL P PROD1 Short wiper to 20,225'. 08:25 - 09:00 0.58 DRILL P PROD1 Directionally drill 2.27 / 2.25 bpm @ 4025 psi, FS = 3850 psi., surface wt 7K, INC 71, Rop 25-35, drill to 20460'. 09:00 - 09:14 0.23 -DRILL P PROD1 Orient to 84R. 09:14 - 11:25 2.18 DRILL P PROD1 Directionally drill 2.3 /2.3 bpm ~ 4080 psi, FS = 3800 psi, ROP _ 32-50 ,Surface wt 6-8K. Incl climbing to 72 deg. 11:25 - 11:30 0.08 DRILL P PROD1 Orient to 169R. 11:30 - 13:00 1.50 DRILL P PROD1 Directionally drill to 20,538. Short wiper set down at 20,474. Will drill to 20560 per Geo request to get gamma across fast drilling zone C~ 20,500 prior to wiper. Stacking weight. Drill to 20541. Made short wipe. Stacking at 20,478 and beyond. Discuss with Anchorage target sand 2FS not present. Will Stop attempting to work to bottom and make MAD pass while awaiting on orders. 13:00 - 16:00 3.00 DRILL P PROD1 Log MAD pass to window. Tie in correction = +7'. 16:00 - 16:30 0.50 DRILL P PROD1 RIH .Stop RIH, did not tag TD. Anchorage Stopped any further action on this sidetrack. 16:30 - 20:00 3.50 DRILL P PROD1 POH. Recieve orders to open hole sidetrack at 19,160' while POH. 20:00 - 22:00 2.00 DRILL P PROD1 Lay out Agitator /RES BHA. Download RES data. Bit grad = 1-3-I. 2 plugged ports. 22:00 - 23:45 1.75 STKOH C PROD1 Cut off 400' coil for coil fatigue management at window depth. 23:45 - 00:00 0.25 STKOH C PROD1 M/U SWS CTC. Pull /press test CTC. 5/1/2006 00:00 - 00:15 0.25 STKOH C PROD1 M/U SWS CTC. Pull /press test CTC. 00:15 - 01:15 1.00 STKOH C PROD1 M/U Open hole sidetrack BHA with 2.0 deg motor and Used HCC Sidetrack bit #8 with brass guide. 01:15 - 04:30 3.25 STKOH C PROD1 RIH with BHA #18. SHT tools - OK: RIH with no pump. 04:30 - 04:45 0.25 STKOH C PROD1 Log down at 18,185' and tie-in with GR. -25' CTD correction. 04:45 - 05:15 0.50 STKOH C PROD1 RIH clean thru window with 60L TF. Set down in build section, which shows the guide has worked off. Continue to RIH to kick off depth of 19,160'. Flag coil at 19,160'. 05:15 - 05:45 0.50 STKOH C PROD1 Orient TF to 166L. Hole was drilled at 85R at 19,160'. 05:45 - 16:30 10.75 STKOH C PROD1 Backream trough from 19,160' up to 19,140'. 2.5/2.5 bpm, 3600 psi, 166E TF, 20 fph. 32.5K up wt. 3' for up /down depth difference. Trough down at 40'/hr, Trough up second pass at 20 Whr. Trough down second pass 40 fUhr. Stop at 19159 and time drill 30 min. Time drill one ft/hr. Stacking. Can't get any motor work. Make third trough pass 20 fUhr up and 40 ft/hr down. Time drill to 19167'. Slight motor work. 16:30 - 17:45 1.25 STKOH C PROD1 Orient to 138E and increase ROP to 10'/hr. Drill to 19173. Orient to 110L. Drill at 10 ft/ hr to 19176 orient to 71 L. Drill to 19179.Increase ROP to 17.Orient 65L Inclination at 19159 = 91.14 in the original well bore the inclination was at 92.6. Looks Good. Orient and drill to 19184 TF 31 L. f~ 40 ROP. Drill to 19190. 17:45 - 20:00 2.25 STKOH C PROD1 Back ream at 26L TF ~ 30 fUhr from 19190 to 19135'. Set Printed: 5/8/2006 11:56:25 AM • 4 BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To Hours Task Code NPT ~ Phase Description of Operations ~~ ~ I 5/1/2006 17:45 - 20:00 2.25 STKOH C PROD1 down while trying to RIH with no pump. 20:00 - 20:15 0.25 STKOH C PROD1 Orient to lowside to RIH. 20:15 - 23:00 2.75 STKOH C PROD1 Ream down with lowside TF and tag bottom at 19,190'. 23:00 - 00:00 1.00 STKOH C PROD1 5/2/2006 00:00 - 02:15 2.25 STKOH C PROD1 02:15 - 05:30 3.25 STKOH C PROD1 05:30 - 09:00 I 3.501 DRILL I C I I PROD1 09:00 - 09:15 0.25 DRILL C PROD1 09:15 - 09:30 0.25 DRILL C PROD1 09:30 - 10:00 0.50 DRILL C PROD1 10:00 - 12:30 I 2.501 DRILL I C I I PROD1 12:30 - 13:15 ~ 0.75 ~ DRILL ~ C ~ ~ PROD1 13:15 - 14:15 1.00 DRILL C PROD1 14:15 - 14:30 0.25 DRILL C PROD1 14:30 - 15:15 0.75 DRILL C PROD1 15:15 - 15:30 0.25 DRILL C PROD1 15:30 - 16:30 1.00 DRILL C PROD1 16:30 - 18:00 1.50 DRILL C PROD1 18:00 - 18:20 0.33 DRILL C PROD1 18:20 - 20:05 1.75 DRILL C PROD1 20:05 - 20:50 0.75 DRILL C PROD1 20:50 - 21:30 0.67 DRILL C PROD1 21:30 - 22:35 1.08 DRILL C PROD1 22:35 - 22:45 I 0.171 DRILL I C I I PROD1 22:45 - 00:00 I 1.251 DRILL I C I I PROD1 5/3/2006 100:00 - 02:45 I 2.751 DRILL I C I I PROD1 02:45 - 03:30 0.75 DRILL C PROD1 03:30 - 03:50 0.33 DRILL C PROD1 03:50 - 04:15 0.42 DRILL C PROD1 04:15 - 07:15 3.00 DRILL C PROD1 07:15 - 09:15 2.00 DRILL C PROD1 09:15 - 10:30 1.25 DHB X WAIT POST Backream with lowside TF. Ream down again with LS TF, tag bottom at 19,190' Orient TF to 45R and backream up to 19,130'. POH for RES lateral BHA. POH with OH sidetrack BHA. UO sidetrack BHA. Adjust motor to 1.2 deg. M/U re-run HCC bit #9, M/U MW D and RES tool and upload, M/U orienter and MHA. Cut off 2' coil. M/U new CTC. Pull /press test. RIH with lateral MWD RES BHA #19 with 1.2 deg motor and re-run HCC bit#9. SHT Tools. RIH 18136'. Orient 25L to exit window. RIH to 18325. Tie - in. Correction = -32 RIH 25L. to 19206' entered old hole. Orient to 168L. Thru open hole sidetrack O.K. RIH .6 bpm 1860 psi. RIH tag 19193. Orient to 5R. Directionally drill 2.45 /2.41 bpm at 3930 psi. injector wt 7K, ROP 87. Begin swap to new Flo Pro. Drilled to 19,300'. Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 103 deg incl, 70R, Drilled to 19,350'. Wiper trip to window. Clean hole. RIH. Tag bottom at 19,350'. Orient TF to 100R. Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 99 deg incl, 140R, Drilled to 19,420'. Orient TF to 60R. Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 101 deg incl, 80R, Drilled to 19,500'. Wiper trip to window. Clean hole. RIH. Orient TF to low side to run thru open hole sidetrack at 19,150'. Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 101 deg incl, 100R, Drilled to 19,607'. Stacking wt. Wiper trip clean to 18315°. Log up GR & tie-into formation marker -add 7' to CTD. RBIH clean to 19100'. Orient TF to 160E &RIH Glen thru OHST pt. Continue RIH to btm. Orient TF to 100R. Up wt = 35k. Run-in wt = 7k. IAP = 1430psi, OAP = 240psi. PVT = 290bb1s. Drill into hard spot @ 19620' with 90-100R TF , 2.35/2.35bpm, 3300/3550psi, 16k WOB & -9k CT wt. Stacking wt without drilling thru hard spot. Grind on & pop thru hard spot. Drill to 19660' with 90R TF, i 2.5/2.5bpm, 3500/3900psi, 16k WOB, -9k CT wt & 15fph ave ROP. See the HRZ base on GR log ~ +/-19612'. Geo call TD. MAD pass OH @ 14fpm from TD to 19050'. POOH drilling BHA to 18310'. Log up GR & tie-into formation marker -add 2' to CTD. POOH drilling BHA #19. UO BHA and download RES tool. Change in plan. Need to set plug in 4-1/2" tubing at 17,890'. Printed: 5/8/2006 11:56:25 AM ~ ~ • BP EXPLORATION Page 13 of 14 ~ Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To j Hours Task I Code NPT Phase Description of Operations 5/3/2006 09:15 - 10:30 1.25 DHB X WAIT POST Wait on tools. 10:30 - 11:00 0.50 DHB C POST HELD H2S RIG EVACUATION DRILL. All personnel accounted for. Reviewed each mans job asignments for drill. 11:00 - 11:15 0.25 DHB C POST SAFETY MEETING. Review procedure, hazards and mitigation for M/U BOT IBP BHA. 11:15 - 12:15 1.00 DHB C POST M/U BOT 3-3/8" IBP, running tools, 1 jt 2-3/8" PH6 tbg, check valve and CTC. OAL = 54.42'. 12:15 - 16:00 3.75 DHB C POST RIH with BOT IBP BHA. Circ at 0.4 bpm to place KCL at IBP once on bottom. Offload liner from pipe shed while RIH. 35K up wt at 17,900'. Subtract 25' CTD, which is average tie-in correction on last 5 trips. Position center of IBP at 17,885', bottom of IBP at 17,890'. Top of IBP at 17,879'. This places center IBP in center of first joint above "X" nipple. 16:00 - 20:00 4.00 DHB C POST Insert 1/2" AL ball and circ. on seat with KCL water. Pump 2.4 bpm, 2400 psi. Slow pump to 0.35 bpm, 210 psi, at 60 bbls. Ball on seat at 71.9 bbls, at 1715 hrs. Holding 360 psi. Let thermally stabilize for 3 hours, standard procedure for setting BOT IBP. 20:00 - 20:15 0.25 DHB C POST Line up & pump via the CT to set the IBP. Pump 0.2bbls of KCUNacI Brine @ 0.2bpm to 750psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine ~ 0.2bpm to 1250psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine C~ 0.2bpm to 1950psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine @ 0.2bpm & shear from IBP @ 2350psi. 20:15 - 20:20 0.08 DHB C POST PUH with S/tool to 17865'. 20:20 - 21:45 1.42 DHB C POST Isolate CT. Line up & P/test wellbore via the kill-line. Bring up WHP to 1000psi & observe +/-200psi pressure loss after shut-in. Repeat process several times till IAP stabilizes 1800psi. P/test wellbore & IA as follows: Time WHP CTP OAP IAP Onset -15 200 73 1185 0 1033 355 145 1805 10 1011 355 143 1800 20 1000 355 138 1796 30 996 355 134 1792 _> Good test -Leaked 3.6% of test pressure in 30 mins. 21:45 - 22:00 0.25 DHB C POST Start swapping well to 9ppg KCVNaCL brine. Pump out 100bb1s of brine. 22:00 - 00:00 2.00 DHB C POST POOH with S/tool to 5000' while swapping well to 9ppg KCVNaCL brine. 5/4/2006 00:00 - 00:45 0.75 DHB C POST Continue POOH & start pumping down diesel FP fluid. 00:45 - 02:15 1.50 RIGD P POST POOH from 4100' freeze protecting wellbore with diesel. SI master & swab valves (22 turns each). Remove fuseable cap. 02:15 - 03:00 0.75 RIGD P POST OOH. PJSM. S/B injector. UD baker IBP S/Tools. 03:00 - 03:15 0.25 RIGD P POST M/U swizzle stick. Stab on injector & jet BOP stack. Flush surface lines. Pump 5bbls of McOH. 03:15 - 03:25 0.17 RIGD P POST PJSM for B/D CT with N2. 03:25 - 03:30 0.08 RIGD P POST P/T N2 lines - OK. 03:30 - 05:15 1.75 RIGD P POST Blow down CT with N2 & bleed off. Meanwhile clean out pits & Printed: 5/6/2006 11:56:25 AM i • • a BP EXPLORATION Page 14 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 I Date ~ From - To Hours Task Code NPT Phase Description of Operations 5/4/2006 03:30 - 05:15 1.75 RIGD P POST tanks. S/B injector & UD swizzle stick. 05:15 - 05:30 0.25 RIGD P POST Held PJSM for cutting 3090' of CT. 05:30 - 08:00 2.50 RIGD P POST R/U hydraulic cutter & cut 3,090' of CT. Cleaned out cuttings tank with supersucker. Moved trailers and Sperry / MI shacks to C pad. 08:00 - 10:00 2.00 RIGD P POST N/D BOPE, N/U tree cap and press test to 4,000 psi. RELEASED RIG AT 10:00 HRS, 05/04!2006 A TOTAL OF 19 DAYS, 9-1/2 HOURS FROM RIG ACCEPT TO RELEASE. All further DIMS information will be on C-34A dims. Printed: 5/8/2006 11:56:25 AM •Halliburton Com an P Y Survey Report Company: BP Amoco Date: 5/9(2006 Time: 16:16:51 Page: 1 Field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North i Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/ 1993 10:09 59.8 Wcll: NK-14 it Wellpath: NK-14APB1 Section (VS) Reference: Survey Calculation Method: Well (O.OON,O.OOE,190.OOAzi) Minimum Curvature Db: Oracle - - Field: Niakuk - - _ - -- North Slope UNITED STATES Map System:US State Pl ane Coord inate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Well: NK-14 Slot Name: 14 NK-14 Well Position: +N/-S -1564.96 ft Northing: 5979894.64 ft Latitude: 70 20 50.455 N +E/-W 7022.88 ft Easting : 721617.74 ft Longitude: 148 12 2.773 W Position Uncertainty: 0.00 ft Wellpath: NK-14APB1 Drilled From: NK-14 500292266870 Tie-on Depth: 18225.00 ft Current Datum: 10: 14 10/16/1 993 10:09 Height 59.80 ft Above System Datum: Mean Sea Level Magnetic Data: 2/17/2006 Declination : 24.87 deg Field Strength: 57629 nT Mag Dip Angle: 80.98 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 40.70 0.00 0.00 190.00 Survey Program for Definitive Wellpath Date: 5/1/2006 Validated: Yes Version: 3 Actual From To Survey Toolcode Tool Name ft ft 100.00 18200.00 Composi te (100.00-18700.00) (0 GYD-GC-MS Gyrodata gyrocompa ssing m/s 18216.00 20541.00 MWD (18216.00-20541.00) MWD MWD -Standard Survey ~, MD lncl Azim TVD Sys TVD N/S E/W MapN MapE Tool ft deg deg ft ft ft ft ft ft 40.70 0.00 0.00 40.70 -19.10 0.00 0.00 5979894:64 721617.74 TIE LINE 100.00 0.16 9.45 100.00 40.20 0.08 0.01 5979894.72 721617.75 GYD-GC-MS 200.00 0.17 324.98 200.00 140.20 0.34 -0.05 5979894.98 721617.68 GYD-GC-MS 300.00 0.19 302.71 300.00 240.20 0.55 -0.27 5979895.18 721617.45 GYD-GC-MS 400.00 0.23 279.56 400.00 340.20 0.67 -0.61 5979895.29 721617.11 GYD-GC-MS 500.00 0.31 235.20 500.00 440.20 0.55 -1.03 5979895.16 721616.69 GYD-GC-MS 600.00 0.31 214.90 600.00 540.20 0.18 -1.41 5979894.77 721616.33 GYD-GC-MS 700.00 0.32 232.76 699.99 640.19 -0.21 -1.78 5979894.37 721615.96 GYD-GC-MS 800.00 0.23 248.74 799.99 740.19 -0.46 -2.19 5979894.12 721615.56 GYD-GC-MS 900.00 0.42 305.76 899.99 840.19 -0.31 -2.68 5979894.25 721615.07 GYD-GC-MS 1000.00 0.85 328.91 999.99 940.19 0.54 -3.36 5979895.07 721614.36 GYD-GC-MS 1100.00 1.57 332.03 1099.96 1040.16 2.38 -4.38 5979896.89 721613.29 GYD-GC-MS 1200.00 1.86 332.92 1199.92 1140.12 5.04 -5.77 5979899.50 721611.83 GYD-GC-MS 1300.00 2.29 333.44 1299.85 1240.05 8.27 -7.40 5979902.68 721610.10 GYD-GC-MS 1400.00 3.01 332.46 1399.74 1339.94 12.38 -9.51 5979906.73 721607.87 GYD-GC-MS 1500.00 3.63 332.93 1499.58 1439.78 17.53 -12.16 5979911.80 721605.07 GYD-GC-MS 1600.00 4.74 335.39 1599.31 1539.51 24.11 -15.32 5979918.28 721601.71 GYD-GC-MS 1700.00 5.86 338.10 1698.88 1639.08 32.60 -18.95 5979926.66 721597.84 GYD-GC-MS 1800.00 7.17 341.39 1798.23 1738.43 43.25 -22.84 5979937.19 721593.63 GYD-GC-MS 1900.00 10.03 342.63 1897.10 1837.30 57.48 -27.43 5979951.28 721588.62 GYD-GC-MS 2000.00 12.42 343.96 1995.18 1935.38 76.13 -33.01 5979969.75 721582.50 GYD-GC-MS 2025.00 12.99 343.83 2019.56 1959.76 81.41 -34.53 5979974.99 721580.82 GYD-GC-MS 2050.00 13.56 343.66 2043.90 1984.10 86.92 -36.14 5979980.45 721579.05 GYD-GC-MS 2075.00 14.13 343.48 2068.17 2008.37 92.66 -37.83 5979986.13 721577.19 GYD-GC-MS 2100.00 14.70 343.31 2092.38 2032.58 98.62 -39.61 5979992.04 721575.23 GYD-GC-MS 2125.00 15.31 343.10 2116.53 2056.73 104.82 -41.48 5979998.18 721573.18 GYD-GC-MS 2150.00 15.94 343.41 2140.61 2080.81 111.27 -43.42 5980004.57 721571.05 GYD-GC-MS 2175.00 16.17 343.64 2164.63 2104.83 117.90 -45.38 5980011.14 721568.89 GYD-GC-MS 2200.00 16.77 343.05 2188.61 2128.81 124.69 -47.41 5980017.86 721566.66 GYD-GC-MS ~Halli rt n man bu o Co p y Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:16:51 Page: 2 ~~~ Field: Niakuk Co-ordinate(\ E} Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD ) Reference: 10:14 10116/1 993 10:09 59.8 Wcll: NK- 14 Section (VS) R eference: WeII (O.OON,O.OOE,190.OOAzi) ! w'ellpath: NK-14APB1 Survey Calculation Method: Minimum Cu rvature Uh: Orade j Survey MD lncl Azim TVD Sys TVD N/S E/W MapN MapE Tool ft deg deg ft ft ft ft ft ft 2225.00 17.43 342.47 2212.50 2152.70 131.71 -49.59 5980024.82 721564.28 GYD-GC-MS 2250.00 17.93 342.41 2236.32 2176.52 138.95 -51.88 5980031.98 721561.77 GYD-GC-MS 2275.00 18.62 342.03 2260.06 2200.26 146.41 -54.28 5980039.37 721559.16 GYD-GC-MS 2300.00 19.10 341.75 2283.72 2223.92 154.09 -56.79 5980046.98 721556:42 GYD-GC-MS 2325.00 19.98 341.25 2307.28 2247.48 162.02 -59.44 5980054.82 721553.53 GYD-GC-MS 2350.00 20.87 341.03 2330.70 2270.90 170.28 -62.26 5980062.99 721550.47 GYD-GC-MS 2375.00 21.33 341.02 2354.03 2294.23 178.79 -65.19 5980071.41 721547.29 GYD-GC-MS 2400.00 22.15 340.50 2377.25 2317.45 187.53 -68.24 5980080.06 721543.98 GYD-GC-MS 2425.00 22.79 340.16 2400.35 2340.55 196.53 -71.46 5980088.96 721540.50 GYD-GC-MS 2450.00 23.63 339.66 2423.33 2363.53 205.78 -74.84 5980098.11 721536.85 GYD-GC-MS 2475.00 24.49 339.12 2446.16 2386.36 215.32 -78.43 5980107.54 721532.98 GYD-GC-MS 2500.00 25.05 338.82 2468.86 2409.06 225.10 -82.19 5980117.20 721528.93 GYD-GC-MS 2525.00 26.21 338.09 2491.40 2431.60 235.15 -86.16 5980127.13 721524.66 GYD-GC-MS 2550.00 26.95 337.72 2513.75 2453.95 245.52 -90.37 5980137.37 721520.15 GYD-GC-MS 2575.00 27.71 337.42 2535.96 2476.16 256.13 -94.75 5980147.84 721515.46 GYD-GC-MS 2600.00 28.63 336.95 2558.00 2498.20 267.01 -99.33 5980158.58 721510.56 GYD-GC-MS 2625.00 29.27 336.75 2579.88 2520.08 278.13 -104.09 5980169.56 721505.48 GYD-GC-MS 2650.00 30.31 336.43 2601.57 2541.77 289.53 -109.02 5980180.81 721500.21 GYD-GC-MS 2675.00 30.97 336.17 2623.08 2563.28 301.20 -114.14 5980192.31 721494.74 GYD-GC-MS 2700.00 31.72 336.14 2644.43 2584.63 313.09 -119.40 5980204.05 721489.14 GYD-GC-MS 2725.00 32.50 336.11 2665.61 2605.81 325.24 -124.78 5980216.03 721483.40 GYD-GC-MS 2750.00 33.26 336.13 2686.60 2626.80 337.65 -130.27 5980228.28 721477.54 GYD-GC-MS 2775.00 34.16 336.09 2707.40 2647.60 350.34 -135.89 5980240.79 721471.55 GYD-GC-MS 2800.00 34.58 336.09 2728.04 2668.24 363.24 -141.61 5980253.52 721465.45 GYD-GC-MS 2825.00 35.15 336.11 2748.55 2688.75 376.31 -147.40 5980266.40 721459.28 GYD-GC-MS 2850.00 35.65 336.12 2768.93 2709.13 389.55 -153.26 5980279.47 721453.03 GYD-GC-MS 2875.00 36.04 336.18 2789.19 2729.39 402.94 -159.18 5980292.68 721446.72 GYD-GC-MS 2900.00 36.58 336.21 2809.34 2749.54 416.48 -165.16 5980306.04 721440.34 GYD-GC-MS 2925.00 37.29 336.28 2829.32 2769.52 430.23 -171.21 5980319.60 721433.89 GYD-GC-MS 2950.00 38.00 336.29 2849.11 2789.31 444.21 -177.35 5980333.39 721427.34 GYD-GC-MS 2975.00 38.49 336.23 2868.75 2808.95 458.38 -183.58 5980347.37 721420.69 GYD-GC-MS 3000.00 38.97 336.37 2888.25 2828.45 472.70 -189.87 5980361.50 721413.98 GYD-GC-MS 3025.00 39.49 336.29 2907.62 2847.82 487.18 -196.22 5980375.78 721407.21 GYD-GC-MS 3050.00 40.19 336.21 2926.81 2867.01 501.84 -202.67 5980390.24 721400.33 GYD-GC-MS 3075.00 40.98 336.15 2945.80 2886.00 516.72 -209.24 5980404.92 721393.32 GYD-GC-MS 3100.00 41.94 335.94 2964.53 2904.73 531.85 -215.96 5980419.84 721386.16 GYD-GC-MS 3125.00 42.80 335.71 2983.00 2923.20 547.22 -222.86 5980435.00 721378.81 GYD-GC-MS 3150.00 43.94 335.26 3001.18 2941.38 562.83 -229.98 5980450.40 721371.23 GYD-GC-MS 3175.00 45.10 334.93 3019.00 2959.20 578.73 -237.36 5980466.07 721363.38 GYD-GC-MS 3200.00 46.30 334.57 3036.46 2976.66 594.92 -245.00 5980482.02 721355.27 GYD-GC-MS 3225.00 47.42 334.39 3053.56 2993.76 611.38 -252.85 5980498.24 721346.93 GYD-GC-MS 3250.00 48.19 334.37 3070.35 3010.55 628.08 -260.86 5980514.70 721338.43 GYD-GC-MS 3275.00 49.37 334.53 3086.82 3027.02 645.04 -268.97 5980531.42 721329.82 GYD-GC-MS 3300.00 50.25 334.92 3102.95 3043.15 662.31 -277.13 5980548.44 721321.16 GYD-GC-MS 3325.00 51.00 334.98 3118.81 3059.01 679.82 -285.31 5980565.69 721312.46 GYD-GC-MS 3350.00 51.79 335.44 3134.41 3074.61 697.56 -293.50 5980583.18 721303.75 GYD-GC-MS 3375.00 52.32 335.60 3149.78 3089.98 715.50 -301.67 5980600.87 721295.06 GYD-GC-MS 3400.00 52.81 335.80 3164.98 3105.18 733.59 -309.84 5980618.71 721286.36 GYD-GC-MS 3425.00 53.32 336.15 3180.00 3120.20 751.84 -317.97 5980636.72 721277.69 GYD-GC-MS 3450.00 53.83 336.26 3194.85 3135.05 770.25 -326.09 5980654.87 721269.03 GYD-GC-MS 3475.00 54.45 336.64 3209.49 3149.69 788.82 -334.18 5980673.20 721260.39 GYD-GG-MS 3500.00 54.97 336.86 3223.94 3164.14 807.57 -342.24 5980691.70 721251.78 GYD-GC-MS ~Halliburton Com an P Y Survey Report Company: BP Amoco Field: Niakuk Site: NK Main Pad Nell: NK-14 Wellpath: NK-14APB1 Su r~ e~ --- _ _ __ MD locl Azim TVD Sys "fVD ft deg deg ft ft 3525.00 55.51 337.14 3238.19 3178.39 3550.00 56.07 337.51 3252.25 3192.45 3575.00 56.71 337.60 3266.08 3206.28 3600.00 57.35 337.91 3279.69 3219.89 3625.00 57.95 338.05 3293.07 3233.27 3650.00 58.60 338.23 3306.21 3246.41 3675.00 59.04 338.37 3319.15 3259.35 3700.00 59.56 338.46 3331.92 3272.12 3725.00 59.20 338.39 3344.65 3284.85 3750.00 58.18 338.27 3357.64 3297.84 3775.00 57.47 338.54 3370.96 3311.16 3800.00 56.18 338.95 3384.64 3324.84 3825.00 55.54 339.00 3398.67 3338.87 3850.00 54.77 339.05 3412.95 3353.15 3875.00 54.03 339.25 3427.50 3367.70 3900.00 53.48 339.54 3442.28 3382.48 3925.00 53.52 339.91 3457.15 3397.35 3950.00 54.06 339.93 3471.92 3412.12 3975.00 54.46 340.09 3486.53 3426.73 4000.00 54.97 340.08 3500.97 3441.17 4025.00 54.55 340.57 3515.39 3455.59 4050.00 54.91 340.63 3529.83 3470.03 4075.00 55.15 340.88 3544.16 3484.36 4100.00 55.65 341.12 3558.35 3498.55 4125.00 56.07 341.40 3572.38 3512.58 4150.00 56.72 341.45 3586.22 3526.42 4175.00 57.44 341.42 3599.81 3540.01 4200.00 58.16 341.48 3613.13 3553.33 4225.00 58.83 341.41 3626.19 3566.39 4250.00 59.33 341.26 3639.04 3579.24 4275.00 59.54 340.96 3651.75 3591.95 4300.00 59.93 340.71 3664.35 3604.55 4325.00 60.15 340.43 3676.84 3617.04 4350.00 60.52 340.25 3689.21 3629.41 4375.00 60.82 340.03 3701.45 3641.65 4400.00 61.33 339.91 3713.55 3653.75 4425.00 61.90 339.75 3725.43 3665.63 4450.00 62.22 339.49 3737.14 3677.34 4475.00 62.68 339.36 3748.71 3688.91 4500.00 63.25 339.18 3760.07 3700.27 4525.00 63.84 338.96 3771.21 3711.41 4550.00 64.20 338.65 3782.16 3722.36 4575.00 64.94 338.58 3792.90 3733.10 4600.00 65.75 338.54 3803.32 3743.52 4625.00 66.31 338.44 3813.48 3753.68 4650.00 66.77 338.46 3823.43 3763.63 4675.00 66.91 338.43 3833.27 3773.47 4700.00 66.88 338.26 3843.08 3783.28 4725.00 67.33 338.14 3852.80 3793.00 4750.00 67.39 337.59 3862.43 3802.63 4775.00 67.44 337.13 3872.03 3812.23 4800.00 67.21 336.61 3881.66 3821.86 4825.00 67.03 335.93 3891.38 3831.58 N/S ft 826.48 845.55 864.80 884.21 903.79 923.52 943.40 963.39 983.39 1003.24 1022.92 1042.42 1061.73 1080.89 1099.89 1118.76 1137.61 1156.56 1175.63 1194.81 1214.04 1233.29 1252.63 1272.09 1291.68 1311.42 1331.31 1351.37 1371.58 1391.90 1412.26 1432.66 1453.08 1473.54 1494.04 1514.60 1535.24 1555.95 1576.70 1597.52 1618.43 1639.38 1660.41 1681.55 1702.81 1724.14 1745.52 1766.89 1788.27 1809.64 1830.95 1852.16 1873.25 Date: 5/9/2006 Time: 16:16:51 Page: 3 Co-ordinate(NE) Reference: Well: NK-14, True North Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Survey Calculation Method: Minimum Curvature Db: Orade F/W ft -350.26 -358.23 -366.18 -374.12 -382.04 -389.96 -397.87 -405.78 -413.69 -421.57 -429.36 -436.95 -444.37 -451.72 -458.95 -466.05 -473.01 -479.94 -486.87 -493.82 -500.70 -507.48 -514.23 -520.93 -527.58 -534.21 -540.89 -547.62 -554.41 -561.27 -568.24 -575.33 -582.53 -589.84 -597.24 -604.74 -612.32 -620.01 -627.80 -635.69 -643.68 -651.81 -660.04 -668.35 -676.72 -685.14 -693.59 -702.07 -710.63 -719.32 -728.21 -737.27 -746.54 R1apN MapE "fool ft ft - 5980710.36 _ _ 721243.20 - GYD-GC-MS 5980729.19 721234.67 GYD-GC-MS 5980748.19 721226.16 GYD-GC-MS 5980767.36 721217.65 GYD-GC-MS 5980786.70 721209.16 GYD-GC-MS 5980806.19 721200.66 GYD-GC-MS 5980825.82 721192.17 GYD-GC-MS 5980845.56 721183.67 GYD-GC-MS 5980865.33 721175.17 GYD-GC-MS 5980884.93 721166.70 GYD-GC-MS 5980904.37 721158.34 GYD-GC-MS 5980923.63 721150.18 GYD-GC-MS 5980942.72 721142.19 GYD-GC-MS 5980961.65 721134.28 GYD-GC-MS 5980980.42 721126.49 GYD-GC-MS 5980999.08 721118.83 GYD-GC-MS 5981017.71 721111.32 GYD-GC-MS 5981036.45 721103.83 GYD-GC-MS 5981055.30 721096.34 GYD-GC-MS 5981074.27 721088.82 GYD-GC-MS 5981093.29 721081.38 GYD-GC-MS 5981112.33 721074.04 GYD-GC-MS 5981131.46 721066.72 GYD-GC-MS 5981150.71 721059.44 GYD-GC-MS 5981170.10 721052.22 GYD-GC-MS 5981189.63 721045.01 GYD-GC-MS 5981209.32 721037.74 GYD-GC-MS 5981229.16 721030.42 GYD-GC-MS 5981249.16 721023.04 GYD-GC-MS 5981269.27 721015.58 GYD-GC-MS 5981289.42 721008.01 GYD-GC-MS 5981309.59 721000.33 GYD-GC-MS 5981329.80 720992.52 GYD-GC-MS 5981350.03 720984.61 GYD-GC-MS 5981370.30 720976.60 GYD-GC-MS 5981390.62 720968.50 GYD-GC-MS 5981411.04 720960.31 GYD-GC-MS 5981431.50 720952.01 GYD-GC-MS 5981452.01 720943.61 GYD-GC-MS 5981472.60 720935.12 GYD-GC-MS 5981493.25 720926.51 GYD-GC-MS 5981513.96 720917.77 GYD-GC-MS 5981534.73 720908.92 GYD-GC-MS 5981555.62 720899.99 GYD-GC-MS 5981576.62 720890.99 GYD-GC-MS 5981597.69 720881.94 GYD-GC-MS 5981618.80 720872.87 GYD-GC-MS 5981639.91 720863.76 GYD-GC-MS 5981661.03 720854.57 GYD-GC-MS 5981682.14 720845.25 GYD-GC-MS 5981703.17 720835.74 GYD-GC-MS 5981724.11 720826.06 GYD-GC-MS 5981744.91 720816.17 GYD-GC-MS ~Halliburton Com an p Y Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:16:51 Page: 4 Field: Nia ~ kuk Co-ordinate(N E) Reference: Well: NK-14, True North ' Site: NK Main Pad Vertical (TVD ) Reference: 10:14 10/16/1993 10:09 59.8 Nell: NK -14 Section (VS) R eference: ~fVell (O.OON, O.OOE,190.OOAzi) ~Vcllpath: NK -14APB1 Survev Calculation Method: Minimum Cu rvature Db: Oracle Su r~ c~ MD Incl Atim TVD Sys'I~VD \/S E/W Map\ ~~TapE Tool ft deg deg ft ft ft ft ft ft 4850.00 67.24 335.43 3901.10 3841.30 1894.24 -756.02 5981765.61 720806.07 GYD-GC-MS 4875.00 67.18 334.75 3910.78 3850.98 1915.14 -765.73 5981786.22 720795.75 GYD-GC-MS 4900.00 67.26 334.39 3920.46 3860.66 1935.96 -775.63 5981806.73 720785.24 GYD-GC-MS 4925.00 67.24 334.15 3930.13 3870.33 1956.73 -785.64 5981827.19 720774.62 GYD-GC-MS 4950.00 67.11 334.20 3939.83 3880.03 1977.47 -795.68 5981847.63 720763.97 GYD-GC-MS 4975.00 67.23 334.22 3949.53 3889.73 1998.21 -805.70 5981868.07 720753.34 GYD-GC-MS 5000.00 66.93 334.28 3959.26 3899.46 2018.95 -815.70 5981888.50 720742.73 GYD-GC-MS 5025.00 66.73 334.30 3969.10 3909.30 2039.66 -825.68 5981908.90 720732.15 GYD-GC-MS 5050.00 66.64 334.38 3979.00 3919.20 2060.36 -835.62 5981929.29 720721.60 GYD-GC-MS 5075.00 66.19 334.51 3989.00 3929.20 2081.03 -845.50 5981949.66 720711.11 GYD-GC-MS 5100.00 66.23 334.58 3999.08 3939.28 2101.68 -855.33 5981970.02 720700.67 GYD-GC-MS 5125.00 66.01 334.57 4009.20 3949.40 2122.33 -865.15 5981990.36 720690.25 GYD-GC-MS 5150.00 66.15 334.65 4019.34 3959.54 2142.97 -874.95 5982010.71 720679.85 GYD-GC-MS 5175.00 66.03 334.61 4029.47 3969.67 2163.62 -884.74 5982031.06 720669.45 GYD-GC-MS 5200.00 65.81 334.48 4039.67 3979.87 2184.23 -894.55 5982051.37 720659.03 GYD-GC-MS 5225.00 66.39 334.56 4049.80 3990.00 2204.87 -904.38 5982071.70 720648.60 GYD-GC-MS 5250.00 66.63 334.48 4059.77 3999.97 2225.56 -914.24 5982092.10 720638.13 GYD-GC-MS 5275.00 66.76 334.41 4069.66 4009.86 2246.28 -924.15 5982112.51 720627.61 GYD-GC-MS 5300.00 66.88 334.48 4079.50 4019.70 2267.01 -934.06 5982132.94 720617.09 GYD-GC-MS 5325.00 66.85 334.42 4089.32 4029.52 2287.75 -943.98 5982153.38 720606.57 GYD-GC-MS 5350.00 67.32 334.42 4099.05 4039.25 2308.52 -953.92 5982173.84 720596.02 GYD-GC-MS 5375.00 67.43 334.38 4108.67 4048.87 2329.33 -963.89 5982194.35 720585.43 GYD-GC-MS 5400.00 67.50 334.32 4118.25 4058.45 2350.15 -973.89 5982214.86 720574.83 GYD-GC-MS 5425.00 67.68 334.34 4127.78 4067.98 2370.98 -983.90 5982235.38 720564.21 GYD-GC-MS 5450.00 67.56 334.32 4137.30 4077.50 2391.82 -993.91 5982255.91 720553.58 GYD-GC-MS 5475.00 67.82 334.34 4146.79 4086.99 2412.66 -1003.93 5982276.45 720542.95 GYD-GC-MS 5500.00 67.74 334.36 4156.25 4096.45 2433.52 -1013.95 5982297.01 720532.32 GYD-GC-MS 5525.00 67.82 334.40 4165.70 4105.90 2454.39 -1023.96 5982317.57 720521.70 GYD-GC-MS 5550.00 68.03 334.43 4175.10 4115.30 2475.29 -1033.96 5982338.16 720511.08 GYD-GC-MS 5575.00 68.01 334.53 4184.45 4124.65 2496.21 -1043.95 5982358.78 720500.48 GYD-GC-MS 5600.00 68.11 334.54 4193.79 4133.99 2517.15 -1053.92 5982379.41 720489.90 GYD-GC-MS 5625.00 67.97 334.50 4203.14 4143.34 2538.08 -1063.89 5982400.03 720479.31 GYD-GC-MS 5650.00 67.70 334.53 4212.57 4152.77 2558.98 -1073.86 5982420.63 720468.73 GYD-GC-MS 5675.00 67.43 334.48 4222.12 4162.32 2579.83 -1083.80 5982441.18 720458.17 GYD-GC-MS 5700.00 67.10 334.51 4231.78 4171.98 2600.64 -1093.73 5982461.69 720447.63 GYD-GC-MS 5725.00 67.09 334.53 4241.51 4181.71 2621.43 -1103.64 5982482.18 720437.12 GYD-GC-MS 5750.00 66.82 334.46 4251.29 4191.49 2642.20 -1113.54 5982502.64 720426.60 GYD-GC-MS 5775.00 66.81 334.52 4261.14 4201.34 2662.94 -1123.44 5982523.07 720416.10 GYD-GC-MS 5800.00 66.62 334.58 4271.02 4211.22 2683.67 -1133.31 5982543.51 720405.62 GYD-GC-MS 5825.00 66.44 334.64 4280.98 4221.18 2704.39 -1143.14 5982563.92 720395.18 GYD-GC-MS 5850.00 66.45 334.58 4290.97 4231.17 2725.09 -1152.97 5982584.33 720384.75 GYD-GC-MS 5875.00 66.37 334.59 4300.97 4241.17 2745.79 -1162.80 5982604.72 720374.31 GYD-GC-MS 5900.00 66.36 334.51 4310.99 4251.19 2766.47 -1172.64 5982625.10 720363.86 GYD-GC-MS 5925.00 66.37 334.61 4321.02 4261.22 2787.15 -1182.48 5982645.48 720353.41 GYD-GC-MS 5950.00 66.46 334.64 4331.02 4271.22 2807.85 -1192.30 5982665.88 720342.99 GYD-GC-MS 5975.00 66.61 334.64 4340.97 4281.17 2828.57 -1202.12 5982686.30 720332.56 GYD-GC-MS 6000.00 66.59 334.69 4350.90 4291.10 2849.31 -1211.94 5982706.74 720322.13 GYD-GC-MS 6025.00 66.64 334.75 4360.83 4301.03 2870.06 -1221.74 5982727.19 720311.72 GYD-GC-MS 6050.00 66.70 334.68 4370.73 4310.93 2890.81 -1231.54 5982747.65 720301.31 GYD-GC-MS 6075.00 66.70 334.71 4380.61 4320.81 2911.57 -1241.36 5982768.10 720290.88 GYD-GC-MS 6100.00 66.83 334.65 4390.48 4330.68 2932.34 -1251.18 5982788.57 720280.45 GYD-GC-MS 6125.00 66.67 334.59 4400.35 4340.55 2953.09 -1261.03 5982809.02 720270.00 GYD-GC-MS `- Halliburton Company Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:16:51 Page: 5 Field: Nia kuk Cu-ordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD ) Reference: 10:14 10N6/1993 10:09 59.8 W'cIL• NK- 14 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Wellpath: NK- 14APB1 Survev Calcu lation Method: Minimum Curvature Ub: Orade Su r~ ev MD Incl A2im TVD SVS TVD N/S F/W - _ - Map\ MapE -- - Tool ft deg deg ft ft ft ft ft ft 6150.00 66.52 334.67 4410.28 4350.48 _ - __ 2973.82 _- - -1270.86 - 5982829.45 720259.56 GYD-GC-MS 6175.00 66.48 334.78 4420.25 4360.45 2994.55 -1280.65 5982849.88 720249.16 GYD-GC-MS 6200.00 66.46 334.72 4430.23 4370.43 3015.28 -1290.42 5982870.31 720238.78 GYD-GC-MS 6225.00 66.44 334.69 4440.21 4380.41 3036.00 -1300.22 5982890.73 720228.37 GYD-GC-MS 6250.00 66.40 334.69 4450.22 4390.42 3056.72 -1310.01 5982911.15 720217.97 GYD-GC-MS 6275.00 66.06 334.71 4460.29 4400.49 3077.40 -1319.79 5982931.53 720207.59 GYD-GC-MS 6300.00 65.94 334.81 4470.46 4410.66 3098.06 -1329.53 5982951.89 720197.24 GYD-GC-MS 6325.00 65.93 334.92 4480.66 4420.86 3118.73 -1339.22 5982972.26 720186.94 GYD-GC-MS 6350.00 66.29 334.96 4490.78 4430.98 3139.43 -1348.91 5982992.67 720176.65 GYD-GC-MS 6375.00 66.37 335.07 4500.82 4441.02 3160.19 -1358.58 5983013.13 720166.37 GYD-GC-MS 6400.00 66.23 334.79 4510.87 4451.07 3180.92 -1368.28 5983033.57 720156.06 GYD-GC-MS 6425.00 66.11 334.53 4520.97 4461.17 3201.59 -1378.06 5983053.94 720145.67 GYD-GC-MS 6450.00 65.62 334.45 4531.19 4471.39 3222.18 -1387.89 5983074.23 720135.24 GYD-GC-MS 6475.00 66.19 334.42 4541.39 4481.59 3242.77 -1397.74 5983094.51 720124.79 GYD-GC-MS 6500.00 66.19 334.32 4551.49 4491.69 3263.39 -1407.63 5983114.83 720114.29 GYD-GC-MS 6525.00 66.32 334.26 4561.55 4501.75 3284.01 -1417.56 5983135.15 720103.76 GYD-GC-MS 6550.00 65.97 334.10 4571.66 4511.86 3304.59 -1427.52 5983155.43 720093.19 GYD-GC-MS 6575.00 65.99 333.98 4581.84 4522.04 3325.12 -1437.51 5983175.65 720082.60 GYD-GC-MS 6600.00 65.99 333.77 4592.01 4532.21 3345.62 -1447.57 5983195.85 720071.94 GYD-GC-MS 6625.00 65.92 333.74 4602.20 4542.40 3366.10 -1457.67 5983216.02 720061.24 GYD-GC-MS 6650.00 65.85 333.71 4612.41 4552.61 3386.56 -1467.77 5983236.17 720050.54 GYD-GC-MS 6675.00 65.89 333.61 4622.63 4562.83 3407.01 -1477.89 5983256.31 720039.82 GYD-GC-MS 6700.00 65.82 333.47 4632.86 4573.06 3427.43 -1488.05 5983276.42 720029.05 GYD-GC-MS 6725.00 65.92 333.43 4643.08 4583.28 3447.84 -1498.25 5983296.52 720018.26 GYD-GC-MS 6750.00 65.84 333.35 4653.30 4593.50 3468.24 -1508.47 5983316.61 720007.44 GYD-GC-MS 6775.00 65.68 333.32 4663.56 4603.76 3488.61 -1518.70 5983336.66 719996.61 GYD-GC-MS 6800.00 65.63 333.46 4673.87 4614.07 3508.98 -1528.91 5983356.72 719985.81 GYD-GC-MS 6825.00 65.96 333.59 4684.12 4624.32 3529.39 -1539.07 5983376.82 719975.05 GYD-GC-MS 6850.00 65.65 333.56 4694.36 4634.56 3549.81 -1549.22 5983396.93 719964.30 GYD-GC-MS 6875.00 65.72 333.64 4704.66 4644.86 3570.22 -1559.35 5983417.03 719953.57 GYD-GC-MS 6900.00 65.50 333.57 4714.98 4655.18 3590.61 -1569.47 5983437.11 719942.85 GYD-GC-MS 6925.00 65.45 333.56 4725.36 4665.56 3610.98 -1579.60 5983457.17 719932.13 GYD-GC-MS 6950.00 65.25 333.38 4735.78 4675.98 3631.31 -1589.75 5983477.19 719921.38 GYD-GC-MS 6975.00 65.50 333.29 4746.20 4686.40 3651.62 -1599.94 5983497.19 719910.59 GYD-GC-MS 7000.00 65.38 333.21 4756.59 4696.79 3671.92 -1610.18 5983517.18 719899.76 GYD-GC-MS 7025.00 65.30 333.12 4767.02 4707.22 3692.19 -1620.43 5983537.14 719888.91 GYD-GC-MS 7050.00 65.51 333.10 4777.43 4717.63 3712.47 -1630.72 5983557.10 719878.03 GYD-GC-MS 7075.00 65.20 333.00 4787.85 4728.05 3732.72 -1641.01 5983577.04 719867.14 GYD-GC-MS 7100.00 65.54 333.07 4798.27 4738.47 3752.98 -1651.32 5983596.98 719856.24 GYD-GC-MS 7125.00 65.37 333.05 4808.66 4748.86 3773.25 -1661.62 5983616.94 719845.34 GYD-GC-MS 7150.00 65.23 332.96 4819.10 4759.30 3793.49 -1671.93 5983636.86 719834.44 GYD-GC-MS 7175.00 65.26 332.96 4829.57 4769.77 3813.71 -1682.25 5983656.77 719823.53 GYD-GC-MS 7200.00 65.21 332.91 4840.04 4780.24 3833.92 -1692.58 5983676.67 719812.61 GYD-GC-MS 7225.00 64.95 333.02 4850.58 4790.78 3854.12 -1702.89 5983696.55 719801.71 GYD-GC-MS 7250.00 64.63 333.05 4861.23 4801.43 3874.28 -1713.14 5983716.40 719790.86 GYD-GC-MS 7275.00 64.21 333.21 4872.02 4812.22 3894.39 -1723.33 5983736.20 719780.08 GYD-GC-MS 7300.00 63.79 333.30 4882.98 4823.18 3914.46 -1733.45 5983755.96 719769.38 GYD-GC-MS 7325.00 63.66 333.43 4894.05 4834.25 3934.50 -1743.50 5983775.69 719758.74 GYD-GC-MS 7350.00 64.21 333.61 4905.03 4845.23 3954.60 -1753.51 5983795.48 719748.14 GYD-GC-MS 7375.00 64.45 333.63 4915.86 4856.06 3974.79 -1763.52 5983815.36 719737.53 GYD-GC-MS 7400.00 64.81 333.56 4926.57 4866.77 3995.02 -1773.57 5983835.29 719726.90 GYD-GC-MS 7425.00 65.45 333.66 4937.09 4877.29 4015.34 -1783.65 5983855.30 719716.22 GYD-GC-MS 7450.00 64.95 333.74 4947.57 4887.77 4035.68 -1793.70 5983875.34 719705.57 GYD-GC-MS Halliburton Company Survey Report '; Company: BP Amoco Date: 5/9/2006 '1'imr. 16:16:51 Page: 6 Field: Nia kuk Co-ordinate(NE) Reference: Well: NK-14, True North I Site: NK Main Pad Vertical ('TVD ) Reference: 10:14 10/1 611 993 10:09 59.8 Well: NK -14 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Wcllpath: NK-14AP61 Survey Calcu lation Method: Minimum Cu rvature Db: Oracle Surccc _. - MD Incl Azim TVll SVS"PVD N/S E/w _. MapN - MapE loot ft deg deg ft ft ft ft ft ft 7475.00 64.96 333.56 4958.16 4898.36 4055.98 -1803.76 5983895.33 719694.92 GYD-GC-MS 7500.00 64.38 333.53 4968.85 4909.05 4076.21 -1813.82 5983915.25 719684.26 GYD-GC-MS 7525.00 64.62 333.40 4979.61 4919.81 4096.40 -1823.90 5983935.13 719673.59 GYD-GC-MS 7550.00 64.95 333.52 4990.27 4930.47 4116.63 -1834.01 5983955.06 719662.89 GYD-GC-MS 7575.00 65.04 333.52 5000.83 4941.03 4136.91 -1844.11 5983975.03 719652.19 GYD-GC-MS 7600.00 65.46 333.49 5011.30 4951.50 4157.23 -1854.24 5983995.04 719641.46 GYD-GC-MS 7625.00 65.39 333.41 5021.70 4961.90 4177.57 -1864.40 5984015.06 719630.71 GYD-GC-MS 7650.00 65.59 333.38 5032.07 4972.27 4197.91 -1874.59 5984035.09 719619.92 GYD-GC-MS 7675.00 65.59 333.36 5042.40 4982.60 4218.26 -1884.79 5984055.13 719609.12 GYD-GC-MS 7700.00 65.25 333.32 5052.80 4993.00 4238.57 -1895.00 5984075.14 719598.32 GYD-GC-MS 7725.00 65.13 333.44 5063.29 5003.49 4258.86 -1905.16 5984095.11 719587.56 GYD-GC-MS 7750.00 64.99 333.43 5073.83 5014.03 4279.14 -1915.30 5984115.08 719576.83 GYD-GC-MS 7775.00 65.10 333.46 5084.38 5024.58 4299.41 -1925.43 5984135.04 719566.10 GYD-GC-MS 7800.00 64.87 333.54 5094.95 5035.15 4319.69 -1935.54 5984155.01 719555.40 GYD-GC-MS 7825.00 64.45 333.56 5105.65 5045.85 4339.91 -1945.61 5984174.93 719544.74 GYD-GC-MS 7850.00 64.55 333.77 5116.41 5056.61 4360.14 -1955.62 5984194.85 719534.14 GYD-GC-MS 7875.00 64.42 333.78 5127.18 5067.38 4380.38 -1965.59 5984214.78 719523.57 GYD-GC-MS 7900.00 64.45 333.73 5137.97 5078.17 4400.60 -1975.56 5984234.71 719513.01 GYD-GC-MS 7925.00 64.71 333.97 5148.70 5088.90 4420.87 -1985.51 5984254.67 719502.46 GYD-GC-MS 7950.00 64.81 334.12 5159.36 5099.56 4441.21 -1995.41 5984274.70 719491.97 GYD-GC-MS 7975.00 65.09 334.03 5169.95 5110.15 4461.57 -2005.31 5984294.77 719481.47 GYD-GC-MS 8000.00 64.75 334.07 5180.54 5120.74 4481.93 -2015.22 5984314.83 719470.96 GYD-GC-MS 8025.00 64.74 334.18 5191.21 5131.41 4502.28 -2025.09 5984334.87 719460.50 GYD-GC-MS 8050.00 64.82 334.18 5201.86 5142.06 4522.64 -2034.94 5984354.93 719450.05 GYD-GC-MS 8075.00 64.50 334.30 5212.56 5152.76 4542.99 -2044.76 5984374.97 719439.63 GYD-GC-MS 8100.00 64.48 334.41 5223.33 5163.53 4563.33 -2054.52 5984395.02 719429.27 GYD-GC-MS 8125.00 64.49 334.44 5234.10 5174.30 4583.68 -2064.26 5984415.07 719418.94 GYD-GC-MS 8150.00 64.72 334.35 5244.82 5185.02 4604.04 -2074.02 5984435.14 719408.58 GYD-GC-MS 8175.00 64.54 334.34 5255.53 5195.73 4624.41 -2083.80 5984455.20 719398.20 GYD-GC-MS 8200.00 64.63 334.24 5266.26 5206.46 4644.75 -2093.60 5984475.25 719387.81 GYD-GC-MS 8225.00 64.79 334.41 5276.94 5217.14 4665.12 -2103.39 5984495.32 719377.42 GYD-GC-MS 8250.00 64.56 334.30 5287.63 5227.83 4685.49 -2113.17 5984515.39 719367.04 GYD-GC-MS 8275.00 64.46 334.56 5298.39 5238.59 4705.85 -2122.91 5984535.45 719356.70 GYD-GC-MS 8300.00 64.56 334.67 5309.15 5249.35 4726.24 -2132.58 5984555.54 719346.43 GYD-GC-MS 8325.00 64.46 334.76 5319.91 5260.11 4746.64 -2142.22 5984575.65 719336.19 GYD-GC-MS 8350.00 64.45 334.72 5330.69 5270.89 4767.04 -2151.85 5984595.76 719325.97 GYD-GC-MS 8375.00 64.32 334.66 5341.50 5281.70 4787.42 -2161.49 5984615.84 719315.73 GYD-GC-MS 8400.00 64.61 334.57 5352.27 5292.47 4807.80 -2171.16 5984635.93 719305.46 GYD-GC-MS 8425.00 64.69 334.63 5362.98 5303.18 4828.21 -2180.85 5984656.04 719295.18 GYD-GC-MS 8450.00 65.21 334.70 5373.56 5313.76 4848.68 -2190.54 5984676.21 719284.88 GYD-GC-MS 8475.00 65.73 334.89 5383.94 5324.14 4869.26 -2200.22 5984696.49 719274.59 GYD-GC-MS 8500.00 65.63 334.75 5394.24 5334.44 4889.88 -2209.92 5984716.81 719264.30 GYD-GC-MS 8525.00 65.37 334.64 5404.61 5344.81 4910.44 -2219.64 5984737.08 719253.97 GYD-GC-MS 8550,00 65.26 334.78 5415.05 5355.25 4930.98 -2229.34 5984757.32 719243.66 GYD-GC-MS 8575.00 65.62 334.76 5425.44 5365.64 4951.55 -2239.04 5984777.60 719233.37 GYD-GC-MS 8600.00 66.08 334.72 5435.67 5375.87 4972.18 -2248.77 5984797.93 719223.03 GYD-GC-MS 8625.00 66.67 334.75 5445.68 5385.88 4992.89 -2258.55 5984818.34 719212.64 GYD-GC-MS 8650.00 66.65 334.78 5455.59 5395.79 5013.66 -2268.33 5984838.81 719202.25 GYD-GC-MS 8675.00 67.15 335.07 5465.40 5405.60 5034.48 -2278.08 5984859.34 719191.89 GYD-GC-MS 8700.00 67.42 335.15 5475.05 5415.25 5055.40 -2287.78 5984879.96 719181.57 GYD-GC-MS 8725.00 68.06 335.06 5484.52 5424.72 5076.39 -2297.52 5984900.65 719171.22 GYD-GC-MS 8750.00 67.84 335.03 5493.91 5434.11 5097.40 -2307.30 5984921.36 719160.82 GYD-GC-MS Halliburton Company Survey Report Company: BP Amoco Field: Niakuk Sitr. NK Main Pad Well: NK-14 Wcllpath: NK-14APB1 Date: 5/9/2006 Time: 16:16:51 Page: Co-ordinate(NE) Reference: Well: NK-14, True North Vertical (TVD) Reference: 10:14 10116/1 993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,190AOAzi) Survev Calculation Method: Minimum Curvature Db: 7 racle Survev MD Incl Azim TVD Sys"CVD N/S E/V1' MapN MapE 1'001 ft deg deg ft ft ft ft ft ft 8775.00 67.91 335.06 5503.32 5443.52 5118.40 -2317.07 5984942.06 719150.44 GYD-GC-MS 8800.00 67.64 335.14 5512.78 5452.98 5139.39 -2326.81 5984962.75 719140.08 GYD-GC-MS 8825.00 67.71 335.15 5522.27 5462.47 5160.37 -2336.53 5984983.43 719129.74 GYD-GC-MS 8850.00 67.74 335.11 5531.75 5471.95 5181.36 -2346.26 5985004.13 719119.39 GYD-GC-MS 8875.00 68.09 335.20 5541.15 5481.35 5202.38 -2356.00 5985024.85 719109.04 GYD-GC-MS 8900.00 68.30 335.31 5550.44 5490.64 5223.46 -2365.71 5985045.63 719098.71 GYD-GC-MS 8925.00 68.26 335.36 5559.69 5499.89 5244.57 -2375.41 5985066.44 719088.40 GYD-GC-MS 8950.00 68.61 335.40 5568.88 5509.08 5265.70 -2385.09 5985087.28 719078.09 GYD-GC-MS 8975.00 68.86 335.40 5577.94 5518.14 5286.89 -2394.79 5985108.17 719067.77 GYD-GC-MS 9000.00 68.95 335.52 5586.94 5527.14 5308.11 -2404.48 5985129.09 719057.46 GYD-GC-MS 9025.00 69.09 335.42 5595.89 5536.09 5329.34 -2414.17 5985150.03 719047.15 GYD-GC-MS 9050.00 69.35 335.41 5604.76 5544.96 5350.60 -2423.89 5985170.98 719036.80 GYD-GC-MS 9075.00 69.08 335.49 5613.63 5553.83 5371.86 -2433.60 5985191.95 719026.46 GYD-GC-MS 9100.00 69.22 335.64 5622.53 5562.73 5393.13 -2443.27 5985212.92 719016.18 GYD-GC-MS 9125.00 69.37 335.60 5631.37 5571.57 5414.43 -2452.92 5985233.93 719005.90 GYD-GC-MS 9150.00 69.04 335.61 5640.25 5580.45 5435.71 -2462.57 5985254.92 718995.62 GYD-GC-MS 9175.00 69.36 335.82 5649.12 5589.32 5457.01 -2472.19 5985275.92 718985.38 GYD-GC-MS 9200.00 69.09 335.68 5657.99 5598.19 5478.33 -2481.79 5985296.94 718975.16 GYD-GC-MS 9225.00 69.33 335.64 5666.87 5607.07 5499.62 -2491.42 5985317.94 718964.90 GYD-GC-MS 9250.00 69.30 335.51 5675.70 5615.90 5520.92 -2501.09 5985338.94 718954.60 GYD-GC-MS 9275.00 69.32 335.41 5684.53 5624.73 5542.19 -2510.80 5985359.92 718944.26 GYD-GC-MS 9300.00 69.57 335.41 5693.31 5633.51 5563.48 -2520.54 5985380.90 718933.90 GYD-GC-MS 9325.00 69.51 335.31 5702.05 5642.25 5584.77 -2530.31 5985401.90 718923.51 GYD-GC-MS 9350.00 69.69 335.31 5710.76 5650.96 5606.06 -2540.10 5985422.89 718913.10 GYD-GC-MS 9375.00 69.57 335.34 5719.46 5659.66 5627.35 -2549.88 5985443.88 718902.69 GYD-GC-MS 9400.00 69.51 335.41 5728.20 5668.40 5648.65 -2559.64 5985464.88 718892.30 GYD-GC-MS 9425.00 69.55 335.40 5736.94 5677.14 5669.94 -2569.39 5985485.87 718881.93 GYD-GC-MS 9450.00 69.60 335.39 5745.67 5685.87 5691.24 -2579.14 5985506.88 718871.55 GYD-GC-MS 9475.00 69.26 335.34 5754.45 5694.65 5712.52 -2588.90 5985527.85 718861.17 GYD-GC-MS 9500.00 69.36 335.28 5763.28 5703.48 5733.77 -2598.67 5985548.80 718850.78 GYD-GC-MS 9525.00 69.30 335.33 5772.11 5712.31 5755.02 -2608.44 5985569.76 718840.38 GYD-GC-MS 9550.00 69.30 335.35 5780.95 5721.15 5776.27 -2618.20 5985590.71 718830.00 GYD-GC-MS 9575.00 69.17 335.38 5789.81 5730.01 5797.52 -2627.94 5985611.66 718819.63 GYD-GC-MS 9600.00 68.80 335.45 5798.77 5738.97 5818.74 -2637.65 5985632.59 718809.30 GYD-GC-MS 9625.00 68.76 335.33 5807.82 5748.02 5839.93 -2647.36 5985653.48 718798.97 GYD-GC-MS 9650.00 68.17 335.43 5817.00 5757.20 5861.07 -2657.05 5985674.32 718788.66 GYD-GC-MS 9675.00 68.84 335.44 5826.16 5766.36 5882.23 -2666.72 5985695.18 718778.37 GYD-GC-MS 9700.00 68.47 335.40 5835.26 5775.46 5903.40 -2676.40 5985716.06 718768.07 GYD-GC-MS 9725.00 68.59 335.40 5844.41 5784.61 5924.56 -2686.09 5985736.92 718757.76 GYD-GC-MS 9750.00 68.30 335.40 5853.60 5793.80 5945.70 -2695.77 5985757.76 718747.46 GYD-GC-MS 9775.00 68.05 335.53 5862.89 5803.09 5966.81 -2705.40 5985778.58 718737.20 GYD-GC-MS 9800.00 68.36 335.57 5872.17 5812.37 5987.94 -2715.01 5985799.41 718726.98 GYD-GC-MS 9825.00 67.92 335.70 5881.48 5821.68 6009.08 -2724.58 5985820.26 718716.78 GYD-GC-MS 9850.00 68.12 335.75 5890.84 5831.04 6030.21 -2734.11 5985841.10 718706.63 GYD-GC-MS 9875.00 67.93 335.65 5900.19 5840.39 6051.34 -2743.65 5985861.94 718696.47 GYD-GC-MS 9900.00 68.06 335.76 5909.56 5849.76 6072.47 -2753.19 5985882.77 718686.31 GYD-GC-MS 9925.00 68.14 335.55 5918.88 5859.08 6093.60 -2762.75 5985903.61 718676.13 GYD-GC-MS 9950.00 67.78 335.65 5928.27 5868.47 6114.70 -2772.33 5985924.42 718665.94 GYD-GC-MS 9975.00 67.86 335.63 5937.70 5877.90 6135.79 -2781.87 5985945.22 718655.77 GYD-GC-MS 10000.00 67.87 335.54 5947.12 5887.32 6156.88 -2791.45 5985966.01 718645.58 GYD-GC-MS 10025.00 67.56 335.39 5956.60 5896.80 6177.92 -2801.05 5985986.76 718635.36 GYD-GC-MS 10050.00 67.98 335.72 5966.06 5906.26 6198.99 -2810.63 5986007.53 718625.16 GYD-GC-MS 10075.00 67.70 335.77 5975.49 5915.69 6220.10 -2820.14 5986028.35 718615.03 GYD-GC-MS Halliburton Company Survey Report Company: BP Amoco Field: Niakuk Site: NK Main Pad ~i'ell: NK-14 W'ellpath: NK-14APB1 Survc~' Mll lncl Azim TVD Sys TVD ft deg deg ft ft 10100.00 67.60 335.30 5985.00 5925.20 10125.00 67.37 336.19 5994.57 5934.77 10150.00 67.00 336.13 6004.27 5944.47 10175.00 67.42 335.93 6013.95 5954.15 10200.00 67.21 335.96 6023.59 5963.79 10225.00 67.15 335.89 6033.29 5973.49 10250.00 66.97 336.00 6043.03 5983.23 10275.00 67.00 336.27 6052.81 5993.01 10300.00 67.11 336.00 6062.55 6002.75 10325.00 67.20 336.14 6072.26 6012.46 10350.00 67.05 336.22 6081.98 6022.18 10375.00 67.14 336.21 6091.71 6031.91 10400.00 67.16 336.10 6101.41 6041.61 10425.00 67.08 336.26 6111.13 6051.33 I~ 10450.00 67.41 336.29 6120.80 6061.00 li 10475.00 67.40 336.31 6130.41 6070.61 ~ 10500.00 67.86 336.39 6139.92 6080.12 10525.00 67.71 336.31 6149.38 6089.58 10550.00 67.71 336.49 6158.86 6099.06 10575.00 67.59 336.56 6168.36 6108.56 10600.00 67.83 336.50 6177.85 6118.05 10625.00 67.91 336.89 6187.26 6127.46 10650.00 67.62 336.96 6196.73 6136.93 10675.00 67.74 336.72 6206.22 6146.42 10700.00 66.99 337.20 6215.84 6156.04 10725.00 66.70 337.56 6225.67 6165.87 10750.00 67.12 337.87 6235.48 6175.68 10775.00 65.76 338.82 6245.47 6185.67 10800.00 64.69 340.06 6255.95 6196.15 10825.00 64.99 339.84 6266.57 6206.77 10850.00 64.63 339.40 6277.21 6217.41 10875.00 63.63 340.43 6288.12 6228.32 10900.00 63.53 340.94 6299.25 6239.45 10925.00 63.89 341.04 6310.32 6250.52 10950.00 64.12 341.27 6321.28 6261.48 10975.00 64.21 340.91 6332.17 6272.37 11000.00 64.04 342.34 6343.08 6283.28 11025.00 64.07 342.13 6354.02 6294.22 11050.00 64.54 342.49 6364.86 6305.06 11075.00 64.25 342.93 6375.66 6315.86 11100.00 64.32 343.42 6386.51 6326.71 11125.00 64.48 343.26 6397.31 6337.51 11150.00 64.99 343.79 6407.98 6348.18 11175.00 65.28 344.01 6418.50 6358.70 11200.00 65.44 343.29 6428.92 6369.12 11225.00 65.84 342.92 6439.23 6379.43 11250.00 66.32 342.50 6449.37 6389.57 11275.00 66.66 341.92 6459.34 6399.54 11300.00 66.80 341.23 6469.22 6409.42 11325.00 67.21 340.44 6478.98 6419.18 11350.00 67.41 339.75 6488.63 6428.83 11375.00 67.55 339.20 6498.20 6438.40 llate: 5!9/2006 Time: 16:16:51 Page: R Co-ordinate(NE) Reference: Well: NK-14, True North Vertical (TVD) Reference: 10:14 10116/1 993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Survey Calculation Method: Minimum Curvature Db: OraCle N/S E/VV ft ft 6241.14 -2829.72 6262.20 -2839.20 6283.28 -2848.52 6304.34 -2857.88 6325.40 -2867.28 6346.44 -2876.68 6367.46 -2886.07 6388.51 -2895.38 6409.56 -2904.69 6430.62 -2914.04 6451.69 -2923.34 6472.76 -2932.63 6493.83 -2941.94 6514.91 -2951.24 6536.01 -2960.52 6557.15 -2969.80 6578.32 -2979.07 6599.52 -2988.35 6620.72 -2997.61 6641.93 -3006.82 6663.15 -3016.04 6684.42 -3025.20 6705.70 -3034.27 6726.97 -3043.37 6748.20 -3052.40 6769.42 -3061.24 6790.70 -3069.96 6812.00 -3078.41 6833.25 -3086.39 6854.50 -3094.14 6875.71 -3102.02 6896.84 -3109.75 6917.97 -3117.15 6939.16 -3124.45 6960.42 -3131.71 6981.71 -3139.01 7003.06 -3146.10 7024.46 -3152.95 7045.93 -3159.80 7067.45 -3166.50 7089.01 -3173.02 7110.61 -3179.48 7132.29 -3185.90 7154.09 -3192.19 7175.89 -3198.58 7197.68 -3205.20 7219.50 -3211.99 7241.33 -3219.00 7263.12 -3226.26 7284.86 -3233.81 7306.54 -3241.66 7328.17 -3249.76 MapN ft MapE ft Tool 5986049.10 718604.84 GYD-GC-MS 5986069.87 718594.73 GYD-GC-MS 5986090.66 718584.80 GYD-GC-MS 5986111.44 718574.82 GYD-GC-MS 5986132.21 718564.80 GYD-GC-MS 5986152.96 718554.78 GYD-GC-MS 5986173.70 718544.78 GYD-GC-MS 5986194.45 718534.85 GYD-GC-MS 5986215.22 718524.92 GYD-GC-MS 5986235.99 718514.96 GYD-GC-MS 5986256.78 718505.04 GYD-GC-MS 5986277.57 718495.13 GYD-GC-MS 5986298.35 718485.20 GYD-GC-MS 5986319.14 718475.28 GYD-GC-MS 5986339.96 718465.38 GYD-GC-MS 5986360.81 718455.48 GYD-GC-MS 5986381.70 718445.59 GYD-GC-MS 5986402.62 718435.68 GYD-GC-MS 5986423.53 718425.80 GYD-GC-MS 5986444.46 718415.96 GYD-GC-MS 5986465.39 718406.13 GYD-GC-MS 5986486.38 718396.34 GYD-GC-MS 5986507.39 718386.65 GYD-GC-MS 5986528.38 718376.93 GYD-GC-MS 5986549.33 718367.27 GYD-GC-MS 5986570.28 718357.81 GYD-GC-MS 5986591.29 718348.46 GYD-GC-MS 5986612.33 718339.38 GYD-GC-MS 5986633.33 718330.78 GYD-GC-MS 5986654.35 718322.40 GYD-GC-MS 5986675.31 718313.90 GYD-GC-MS 5986696.20 718305.55 GYD-GC-MS 5986717.10 718297.53 GYD-GC-MS 5986738.07 718289.60 GYD-GC-MS 5986759.11 718281.72 GYD-GC-MS 5986780.17 718273.80 GYD-GC-MS 5986801.29 718266.08 GYD-GC-MS 5986822.49 718258.59 GYD-GC-MS 5986843.74 718251.12 GYD-GC-MS 5986865.06 718243.78 GYD-GC-MS 5986886.41 718236.63 GYD-GC-MS 5986907.81 718229.53 GYD-GC-MS 5986929.29 718222.48 GYD-GC-MS 5986950.89 718215.55 GYD-GC-MS 5986972.49 718208.51 GYD-GC-MS 5986994.08 718201.25 GYD-GC-MS 5987015.69 718193.82 GYD-GC-MS 5987037.30 718186.17 GYD-GC-MS 5987058.86 718178.27 GYD-GC-MS 5987080.36 718170.08 GYD-GC-MS 5987101.81 718161.59 GYD-GC-MS 5987123.19 718152.85 GYD-GC-MS • Halliburton Company Survey Report Company: BP Amoco Field: Niakuk Sitr. NK Main Pad Wcll: NK-14 Wellpath: NK-14APB1 Sure e~ Date: 5/9/2006 Time: 16.16:51 Vage: 9 Co-ordinate(NE) 12cference: Well: NK-14, True North Vertical (TVD) Reference: 10:14 1 0/1 611993 10:09 59.8 ~i Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Survey Calculation Method: Minimum Curvature llh: Oracle ', MD ft -ncl deg AZIm deg TVD ft Sy's'1'VD ft N/S ft F/W ft MapN ft 11400.00 67.76 339.18 6507.71 6447.91 7349.78 -3257.98 5987144.55 11425.00 67.94 339.11 6517.13 6457.33 7371.42 -3266.22 5987165.93 11450.00 68.38 339.27 6526.43 6466.63 7393.11 -3274.46 5987187.37 11475.00 68.23 338.43 6535.67 6475.87 7414.78 -3282.85 5987208.77 11500.00 68.57 337.78 6544.88 6485.08 7436.35 -3291.51 5987230.08 11525.00 68.65 337.34 6553.99 6494.19 7457.86 -3300.40 5987251.32 11550.00 68.66 337.12 6563.09 6503.29 7479.33 -3309.41 5987272.51 11575.00 68.84 336.32 6572.16 6512.36 7500.73 -3318.62 5987293.63 11600.00 68.88 335.84 6581.17 6521.37 7522.05 -3328.07 5987314.66 11625.00 68.92 335.69 6590.17 6530.37 7543.32 -3337.65 5987335.63 11650.00 69.23 335.62 6599.10 6539.30 7564.59 -3347.27 5987356.61 11675.00 69.30 335.68 6607.95 6548.15 7585.89 -3356.91 5987377.62 11700.00 69.41 335.24 6616.77 6556.97 7607.17 -3366.63 5987398.60 11725.00 69.60 335.27 6625.52 6565.72 7628.44 -3376.43 5987419.57 11750.00 69.29 336.09 6634.30 6574.50 7649.77 -3386.07 5987440.60 11775.00 68.66 335.13 6643.27 6583.47 7671.03 -3395.71 5987461.56 11800.00 69.10 335.29 6652.27 6592.47 7692.20 -3405.49 5987482.43 11825.00 69.13 335.58 6661.19 6601.39 7713.44 -3415.20 5987503.38 11850.00 68.83 335.14 6670.15 6610.35 7734.65 -3424.93 5987524.29 11875.00 68.67 335.13 6679.22 6619.42 7755.79 -3434.72 5987545.13 11900.00 69.15 334.52 6688.21 6628.41 7776.90 -3444.65 5987565.94 11925.00 68.72 335.92 6697.20 6637.40 7798.08 -3454.42 5987586.82 11950.00 68.24 335.21 6706.37 6646.57 7819.26 -3464.04 5987607.70 11975.00 68.21 335.04 6715.64 6655.84 7840.32 -3473.81 5987628.46 12000.00 68.15 335.18 6724.93 6665.13 7861.37 -3483.58 5987649.22 12025.00 68.19 335.40 6734.23 6674.43 7882.45 -3493.28 5987670.00 12050.00 67.84 335.16 6743.59 6683.79 7903.51 -3502.97 5987690.76 12075.00 67.74 334.64 6753.04 6693.24 7924.47 -3512.79 5987711.42 12100.00 67.94 334.76 6762.47 6702.67 7945.40 -3522.69 5987732.05 12125.00 67.75 335.28 6771.90 6712.10 7966.39 -3532.46 5987752.74 12150.00 67.72 334.67 6781.37 6721.57 7987.36 -3542.25 5987773.41 12175.00 67,38 334.34 6790.92 6731.12 8008.21 -3552.20 5987793.96 12200.00 67,44 334.77 6800.52 6740.72 8029.05 -3562.11 5987814.50 12225.00 67.38 334.34 6810.12 6750.32 8049.90 -3572.03 5987835.04 12250.00 67.28 334.08 6819.76 6759.96 8070.67 -3582.07 5987855.50 12275.00 67.28 332.99 6829.41 6769.61 8091.31 -3592.34 5987875.83 12300.00 67.46 334.40 6839.03 6779.23 8112.00 -3602.57 5987896.20 12325.00 67.39 334.15 6848.63 6788.83 8132.79 -3612.59 5987916.69 12350.00 67.61 334.21 6858.20 6798.40 8153.58 -3622.65 5987937.18 12375.00 67.55 334.03 6867.73 6807.93 8174.38 -3632.74 5987957.66 12400.00 67.46 334.38 6877.30 6817.50 8195.17 -3642.79 5987978.15 12425.00 67.64 334.19 6886.85 6827.05 8215.99 -3652.81 5987998.66 12450.00 67.28 333.90 6896.43 6836.63 8236.75 -3662.92 5988019.11 12475.00 67.35 334.20 6906.07 6846.27 8257.49 -3673.01 5988039.54 12500.00 67.18 334.01 6915.73 6855.93 8278.23 -3683.08 5988059.98 12525.00 67.59 333.40 6925.35 6865.55 8298.92 -3693.30 5988080.36 12550.00 66.84 334.71 6935.03 6875.23 8319.65 -3703.39 5988100.77 12575.00 66.58 333.58 6944.91 6885.11 8340.31 -3713.40 5988121.13 12600.00 66.79 334.13 6954.81 6895.01 8360.92 -3723.52 5988141.43 12625.00 66.71 334.23 6964.68 6904.88 8381.60 -3733.52 5988161.80 12650.00 66.31 333.57 6974.64 6914.84 8402.19 -3743.61 5988182.08 12675.00 66.24 333.90 6984.70 6924.90 8422.71 -3753.74 5988202.30 12700.00 66.30 334.04 6994.76 6934.96 8443.28 -3763.78 5988222.56 MapE Tool ft 718144.00 GYD-GC-MS 718135.12 GYD-GC-MS 718126.24 GYD-GC-MS 718117.22 GYD-GC-MS 718107.92 GYD-GC-MS 718098.41 GYD-GC-MS 718088.76 GYD-GC-MS 718078.93 GYD-GC-MS 718068.85 GYD-GC-MS 718058.65 GYD-GC-MS 718048.40 GYD-GC-MS 718038.13 GYD-GC-MS 718027.79 GYD-GC-MS 718017.36 GYD-GC-MS 718007.10 GYD-GC-MS 717996.84 GYD-GC-MS 717986.44 GYD-GC-MS 717976.10 GYD-GC-MS 717965.75 GYD-GC-MS 717955.34 GYD-GC-MS 717944.79 GYD-GC-MS 717934.39 GYD-GC-MS 717924.15 GYD-GC-MS 717913.77 GYD-GC-MS 717903.38 GYD-GC-MS 717893.06 GYD-GC-MS 717882.75 GYD-GC-MS 717872.32 GYD-GC-MS 717861.81 GYD-GC-MS 717851.41 GYD-GC-MS 717841.01 GYD-GC-MS 717830.46 GYD-GC-MS 717819.93 GYD-GC-MS 717809.40 GYD-GC-MS 717798.75 GYD-GC-MS 717787.87 GYD-GC-MS 717777.04 GYD-GC-MS 717766.41 GYD-GC-MS 717755.74 GYD-GC-MS 717745.04 GYD-GC-MS 717734.38 GYD-GC-MS 717723.74 GYD-GC-MS 717713.03 GYD-GC-MS 717702.33 GYD-GC-MS 717691.65 GYD-GC-MS 717680.82 GYD-GC-MS 717670.13 GYD-GC-MS 717659.51 GYD-GC-MS 717648.79 GYD-GC-MS 717638.18 GYD-GC-MS 717627.48 GYD-GC-MS 717616.75 GYD-GC-MS 717606.11 GYD-GC-MS • Halliburton Company Survey Report Company: BP Amoco Date: 5/9/2 006 Ti me: 16:16:51 Nage: ]0 Field: Nia kuk Co-ordinate(N F) Reference: WeII: NK-14, True North Site: NK Main Pad Vertical (TVD ) Reference: 10:14 10/1611 993 10:09 59.8 Well: NK- 14 Section (VS) Reference: WeII (O.OON, O.OOE,190.OOAzi) Wellpath: NK- 14APB1 Survey Calcu lation Method: Minimum Cu rvature Dh: Oracle Survc~ MD Intl Azim TVD Sys TVD N/S E:/W MapN t\~lapE Tool ft deg deg ft ft ft ft ft ft 12725.00 66.13 333.60 7004.84 6945.04 8463 81 -3773.87 5988242.78 717595.41 GYD-GC-MS 12750.00 66.17 333.86 7014.95 6955.15 8484.31 -3783.99 5988262.97 717584.69 GYD-GC-MS 12775.00 65.82 334.09 7025.12 6965.32 8504.83 -3794.02 5988283.19 717574.07 GYD-GC-MS 12800.00 66.13 334.00 7035.30 6975.50 8525.36 -3804.01 5988303.41 717563.47 GYD-GC-MS 12825.00 65.82 334.23 7045.48 6985.68 8545.91 -3813.98 5988323.65 717552.90 GYD-GC-MS 12850.00 65.87 333.92 7055.71 6995.91 8566.42 -3823.95 5988343.86 717542.33 GYD-GC-MS 12875.00 66.03 333.90 7065.90 7006.10 8586.93 -3833.99 5988364.06 717531.68 GYD-GC-MS 12900.00 65.83 334.37 7076.09 7016.29 8607.47 -3843.95 5988384.30 717521.12 GYD-GC-MS 12925.00 66.01 333.97 7086.29 7026.49 8628.01 -3853.89 5988404.54 717510.58 GYD-GC-MS 12950.00 65.85 334.17 7096.49 7036.69 8648.54 -3863.87 5988424.76 717499.99 GYD-GC-MS 12975.00 65.09 335.00 7106.87 7047.07 8669.08 -3873.64 5988445.00 717489.63 GYD-GC-MS 13000.00 65.42 334.34 7117.33 7057.53 8689.60 -3883.35 5988465.23 717479.31 GYD-GC-MS 13025.00 65.38 334.47 7127.74 7067.94 8710.10 -3893.17 5988485.43 717468.89 GYD-GC-MS 13050.00 65.68 334.52 7138.10 7078.30 8730.64 -3902.97 5988505.66 717458.49 GYD-GC-MS 13075.00 65.86 334.50 7148.36 7088.56 8751.22 -3912.78 5988525.94 717448.08 GYD-GC-MS 13100.00 66.17 334.52 7158.52 7098.72 8771.83 -3922.61 5988546.26 717437.64 GYD-GC-MS 13125.00 66.29 334.46 7168.60 7108.80 8792.48 -3932.46 5988566.61 717427.18 GYD-GC-MS 13150.00 66.37 334.50 7178.63 7118.83 8813.15 -3942.33 5988586.97 717416.71 GYD-GC-MS 13175.00 66.69 334.33 7188.59 7128.79 8833.83 -3952.23 5988607.35 717406.20 GYD-GC-MS 13200.00 66.79 334.45 7198.46 7138.66 8854.54 -3962.16 5988627.76 717395.67 GYD-GC-MS 13225.00 67.04 334.50 7208.26 7148.46 8875.29 -3972.07 5988648.21 717385.15 GYD-GC-MS 13250.00 67.21 334.58 7217.98 7158.18 8896.09 -3981.97 5988668.70 717374.64 GYD-GC-MS 13275.00 67.32 334.63 7227.64 7167.84 8916.92 -3991.86 5988689.23 717364.14 GYD-GC-MS 13300.00 67.71 334.55 7237.21 7177.41 8937.79 -4001.77 5988709.79 717353.61 GYD-GC-MS 13325.00 67.90 334.55 7246.65 7186.85 8958.69 -4011.72 5988730.39 717343.05 GYD-GC-MS 13350.00 68.46 334.18 7255.94 7196.14 8979.61 -4021.76 5988751.00 717332.40 GYD-GC-MS 13375.00 68.01 335.10 7265.21 7205.41 9000.59 -4031.70 5988771.68 717321.84 GYD-GC-MS 13400.00 67.24 335.34 7274.73 7214.93 9021.58 -4041.39 5988792.37 717311.53 GYD-GC-MS 13425.00 68.11 335.62 7284.22 7224.42 9042.62 -4050.99 5988813.12 717301.32 GYD-GC-MS 13450.00 68.21 335.07 7293.53 7233.73 9063.71 -4060.67 5988833.91 717291.02 GYD-GC-MS 13475.00 68.62 335.07 7302.72 7242.92 9084.79 -4070.47 5988854.69 717280.60 GYD-GC-MS 13500.00 68.19 336.09 7311.92 7252.12 9105.96 -4080.OS 5988875.56 717270.37 GYD-GC-MS 13525.00 68.06 336.42 7321.24 7261.44 9127.19 -4089.42 5988896.51 717260.40 GYD-GC-MS 13550.00 67.42 335.59 7330.71 7270.91 9148.33 -4098.83 5988917.36 717250.38 GYD-GC-MS 13575.00 67.55 336.15 7340.28 7280.48 9169.41 -4108.27 5988938.15 717240.32 GYD-GC-MS 13600.00 67.66 336.54 7349.81 7290.01 9190.58 -4117.54 5988959.04 717230.42 GYD-GC-MS 13625.00 67.76 336.01 7359.29 7299.49 9211.75 -4126.85 5988979.93 717220.49 GYD-GC-MS 13650.00 67.86 336.03 7368.73 7308.93 9232.91 -4136.26 5989000.79 717210.46 GYD-GC-MS 13675.00 68.41 336.44 7378.04 7318.24 9254.14 -4145.61 5989021.74 717200.49 GYD-GC-MS 13700.00 68.52 336.09 7387.22 7327.42 9275.43 -4154.97 5989042.74 717190.50 GYD-GC-MS 13725.00 68.69 336.01 7396.34 7336.54 9296.70 -4164.42 5989063.72 717180.43 GYD-GC-MS 13750.00 69.09 336.32 7405.34 7345.54 9318.03 -4173.84 5989084.77 717170.38 GYD-GC-MS 13775.00 69.05 335.48 7414.27 7354.47 9339.35 -4183.38 5989105.79 717160.22 GYD-GC-MS 13800.00 68.97 336.63 7423.23 7363.43 9360.68 -4192.85 5989126.83 717150.12 GYD-GC-MS 13825.00 68.58 336.32 7432.28 7372.48 9382.05 -4202.15 5989147.91 717140.19 GYD-GC-MS 13850.00 68.41 335.44 7441.44 7381.64 9403.28 -4211.66 5989168.85 717130.06 GYD-GC-MS 13875.00 68.25 336.48 7450.68 7390.88 9424.49 -4221.12 5989189.78 717119.98 GYD-GC-MS 13900.00 68.33 336.36 7459.92 7400.12 9445.78 -4230.41 5989210.78 717110.06 GYD-GC-MS 13925.00 68.18 335.81 7469.19 7409.39 9467.01 -4239.82 5989231.72 717100.02 GYD-GC-MS 13950.00 68.15 336.35 7478.48 7418.68 9488.22 -4249.23 5989252.64 717089.99 GYD-GC-MS 13975.00 68.01 336.49 7487.82 7428.02 9509.48 -4258.51 5989273.62 717080.09 GYD-GC-MS 14000.00 67.97 335.79 7497.19 7437.39 9530.67 -4267.89 5989294.53 717070.09 GYD-GC-MS + • • Halliburton Company Survey Report _- - -_. Company: BP Amoco Date: 5/9/2006 Time: 16:16:51 Page: 11 Field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical ('fVll) Reference: 10:14 10/16/1993 10:09 59.8 Well: NK-14 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Wellpath: NK-14APB1 Survey Calculation Method: Minimum Curvature Db: Orade Survey MD locl Azim TVD Sys TVD N/S E/W MapN MapE Tool ft deg deg ft ft ft ft ft ft 14025.00 67.67 336.24 7506.62 7446.82 9551.83 -4277.30 5989315.39 717060.06 GYD-GC-MS 14050.00 67.90 336.20 7516.08 7456.28 9573.00 -4286.63 5989336.28 717050.11 GYD-GC-MS 14075.00 67.72 335.82 7525.52 7465.72 9594.15 -4296.04 5989357.14 717040.07 GYD-GC-MS 14100.00 67.37 336.50 7535.07 7475.27 9615.29 -4305.38 5989377.99 717030.11 GYD-GC-MS 14125.00 67.60 336.07 7544.64 7484.84 9636.43 -4314.67 5989398.85 717020.21 GYD-GC-MS 14150.00 67.53 335.89 7554.18 7494.38 9657.54 -4324.07 5989419.67 717010.18 GYD-GC-MS 14175.00 67.21 336.71 7563.80 7504.00 9678.67 -4333.35 5989440.51 717000.28 GYD-GC-MS 14200.00 67.28 336.44 7573.47 7513.67 9699.82 -4342.51 5989461.38 716990.50 GYD-GC-MS 14225.00 67.46 335.72 7583.09 7523.29 9720.91 -4351.87 5989482,19 716980.52 GYD-GC-MS 14250.00 67.11 336.40 7592.74 7532.94 9741.99 -4361.23 5989502.98 716970.55 GYD-GC-MS 14275.00 66.96 336.54 7602.50 7542.70 9763.09 -4370.42 5989523.80 716960.74 GYD-GC-MS 14300.00 66.93 336.50 7612.29 7552.49 9784.19 -4379.58 5989544.62 716950.95 GYD-GC-MS 14325.00 66.87 336.51 7622.10 7562.30 9805.28 -4388.75 5989565.43 716941.17 GYD-GC-MS 14350.00 66.91 336.49 7631.91 7572.11 9826.37 -4397.92 5989586.23 716931.38 GYD-GC-MS 14375.00 66.96 336.47 7641.70 7581.90 9847.46 -4407.10 5989607.04 716921.58 GYD-GC-MS 14400.00 67.00 336.45 7651.48 7591.68 9868.55 -4416.29 5989627.85 716911.77 GYD-GC-MS 14425.00 67.04 336.43 7661.24 7601.44 9889.65 -4425.49 5989648.67 716901.95 GYD-GC-MS 14450.00 67.14 336.37 7670.97 7611.17 9910.75 -4434.71 5989669.49 716892.11 GYD-GC-MS 14475.00 67.23 336.30 7680.67 7620.87 9931.86 -4443.96 5989690.31 716882.24 GYD-GC-MS 14500.00 67.33 336.24 7690.32 7630.52 9952.97 -4453.24 5989711.14 716872.34 GYD-GC-MS 14525.00 67.42 336.17 7699.94 7640.14 9974.08 -4462.55 5989731.97 716862.41 GYD-GC-MS 14550.00 67.44 336.30 7709.53 7649.73 9995.21 -4471.85 5989752.81 716852.49 GYD-GC-MS 14575.00 67.46 336.43 7719.12 7659.32 10016.36 -4481.11 5989773.68 716842.61 GYD-GC-MS 14600.00 67.47 336.56 7728.70 7668.90 10037.54 -4490.32 5989794.57 716832.78 GYD-GC-MS 14625.00 67.49 336.69 7738.28 7678.48 10058.74 -4499.48 5989815.49 716823.00 GYD-GC-MS 14650.00 67.50 336.76 7747.85 7688.05 10079.95 -4508.61 5989836.42 716813.25 GYD-GC-MS 14675.00 67.51 336.84 7757.41 7697.61 10101.18 -4517.70 5989857.37 716803.52 GYD-GC-MS 14700.00 67.51 336.91 7766.98 7707.18 10122.43 -4526.78 5989878.34 716793.83 GYD-GC-MS 14725.00 67.52 336.98 7776.54 7716.74 10143.68 -4535.82 5989899.31 716784.16 GYD-GC-MS 14750.00 67.54 337.06 7786.09 7726.29 10164.95 -4544.84 5989920.31 716774.52 GYD-GC-MS 14775.00 67.56 337.15 7795.64 7735.84 10186.23 -4553.83 5989941.31 716764.90 GYD-GC-MS 14800.00 67.57 337.23 7805.18 7745.38 10207.54 -4562.79 5989962.34 716755.32 GYD-GC-MS 14825.00 67.59 337.31 7814.71 7754.91 10228.85 -4571.72 5989983.38 716745.76 GYD-GC-MS 14850.00 67.66 337.26 7824.23 7764.43 10250.18 -4580.65 5990004.43 716736.21 GYD-GC-MS 14875.00 67.73 337.21 7833.72 7773.92 10271.50 -4589.60 5990025.48 716726.63 GYD-GC-MS 14900.00 67.80 337.16 7843.18 7783.38 10292.83 -4598.57 5990046.54 716717.03 GYD-GC-MS 14925.00 67.87 337.11 7852.61 7792.81 10314.17 -4607.56 5990067.60 716707.41 GYD-GC-MS 14950.00 67.86 337.05 7862.03 7802.23 10335.50 -4616.58 5990088.65 716697.77 GYD-GC-MS 14975.00 67.85 336.99 7871.45 7811.65 10356.81 -4625.62 5990109.69 716688.10 GYD-GC-MS 15000.00 67.84 336.93 7880.88 7821.08 10378.12 -4634.69 5990130.72 716678.41 GYD-GC-MS 15025.00 67.83 336.87 7890.31 7830.51 10399.42 -4643.77 5990151.74 716668.70 GYD-GC-MS 15050.00 67.74 336.93 7899.77 7839.97 10420.71 -4652.85 5990172.75 716659.00 GYD-GC-MS 15075.00 67.65 337.00 7909.25 7849.45 10441.99 -4661.90 5990193.75 716649.32 GYD-GC-MS 15100.00 67.56 337.06 7918.78 7858.98 10463.27 -4670.92 5990214.76 716639.68 GYD-GC-MS 15125.00 67.47 337.12 7928.34 7868.54 10484.55 -4679.91 5990235.76 716630.06 GYD-GC-MS 15150.00 67.35 336.87 7937.94 7878.14 10505.80 -4688.93 5990256.73 716620.41 GYD-GC-MS 15175.00 67.24 336.62 7947.59 7887.79 10526.99 -4698.04 5990277.64 716610.69 GYD-GC-MS 15200.00 67.12 336.36 7957.29 7897.49 10548.12 -4707.23 5990298.49 716600.87 GYD-GC-MS 15225.00 67.00 336.11 7967.03 7907.23 10569.19 -4716.51 5990319.27 716590.98 GYD-GC-MS 15250.00 66.94 336.14 7976.81 7917.01 10590.23 -4725.82 5990340.03 716581.05 GYD-GC-MS 15275.00 66.88 336.17 7986.62 7926.82 10611.26 -4735.12 5990360.77 716571.13 GYD-GC-MS 15300.00 66.83 336.21 7996.45 7936.65 10632.29 -4744.40 5990381.52 716561.24 GYD-GC-MS 15325.00 66.77 336.24 8006.29 7946.49 10653.32 -4753.66 5990402.27 716551.35 GYD-GC-MS Halhburton Company Survey Report Company: BP Amoco ', Field: Niakuk I Sitr. NK Main Pad ~, Well: NK-14 Wellpath: NK-14APB1 Survey MD Incl ft deg im deg D ft ~s TVD ft S ft Date: 5/9/2006 Time: 16:16:51 Page: 12 Co-ordinate(NE) Reference: Well: NK-14, True North Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,190.ODAzi) Survey Calculation Method: Minimum Curvature Db: Oracle I E/W Ntap.~' MapE Tool ft ft ft 15350.00 66.76 336.04 8016.16 7956.36 10674.33 -4762.95 5990422.99 716541.45 GYD-GC-MS 15375.00 66.74 335.85 8026.02 7966.22 10695.30 -4772.32 5990443.68 716531.47 GYD-GC-MS 15400.00 66.72 335.66 8035.90 7976.10 10716.24 -4781.75 5990464.33 716521.42 GYD-GC-MS 15425.00 66.71 335.46 8045.78 7985.98 10737.15 -4791.25 5990484.94 716511.31 GYD-GC-MS 15450.00 66.69 335.36 8055.67 7995.87 10758.03 -4800.80 5990505.53 716501.14 GYD-GC-MS 15475.00 66.67 335.26 8065.57 8005.77 10778.89 -4810.39 5990526.10 716490.94 GYD-GC-MS 15500.00 66.65 335.15 8075.47 8015.67 10799.73 -4820.02 5990546.64 716480.70 GYD-GC-MS 15525.00 66.63 335.05 8085.39 8025.59 10820.54 -4829.68 5990567.16 716470.43 GYD-GC-MS 15550.00 66.66 335.18 8095.30 8035.50 10841.36 -4839.34 5990587.69 716460.16 GYD-GC-MS 15575.00 66.68 335.30 8105.20 8045.40 10862.21 -4848.95 5990608.24 716449.93 GYD-GC-MS 15600.00 66.71 335.43 8115.09 8055.29 10883.08 -4858.53 5990628.82 716439.75 GYD-GC-MS 15625.00 66.74 335.55 8124.97 8065.17 10903.98 -4868.05 5990649.42 716429.61 GYD-GC-MS 15650.00 66.76 335.45 8134.84 8075.04 10924.88 -4877.58 5990670.03 716419.47 GYD-GC-MS 15675.00 66.79 335.35 8144.69 8084.89 10945.77 -4887.14 5990690.63 716409.29 GYD-GC-MS 15700.00 66.82 335.25 8154.54 8094.74 10966.64 -4896.74 5990711.21 716399.08 GYD-GC-MS 15725.00 66.84 335.15 8164.38 8104.58 10987.51 -4906.38 5990731.78 716388.82 GYD-GC-MS 15750.00 66.93 335.30 8174.19 8114.39 11008.38 -4916.02 5990752.36 716378.58 GYD-GC-MS 15775.00 67.02 335.46 8183.97 8124.17 11029.30 -4925.61 5990772.98 716368.38 GYD-GC-MS 15800.00 67.11 335.61 8193.71 8133.91 11050.26 -4935.14 5990793.65 716358.23 GYD-GC-MS 15825.00 67.20 335.76 8203.42 8143.62 11071.25 -4944.63 5990814.35 716348.12 GYD-GC-MS 15850.00 66.97 335.45 8213.15 8153.35 11092.22 -4954.14 5990835.03 716338.00 GYD-GC-MS 15875.00 66.75 335.13 8222.98 8163.18 11113.11 -4963.75 5990855.62 716327.78 GYD-GC-MS 15900.00 66.52 334.82 8232.89 8173.09 11133.90 -4973.46 5990876.12 716317.46 GYD-GC-MS 15925.00 66.29 334.50 8242.90 8183.10 11154.61 -4983.26 5990896.52 716307.04 GYD-GC-MS 15950.00 66.25 334.50 8252.96 8193.16 11175.27 -4993.11 5990916.88 716296.59 GYD-GC-MS 15975.00 66.22 334.51 8263.03 8203.23 11195.92 -5002.96 5990937.23 716286.13 GYD-GC-MS 16000.00 66.18 334.51 8273.12 8213.32 11216.57 -5012.81 5990957.58 716275.68 GYD-GC-MS 16025.00 66.14 334.51 8283.23 8223.43 11237.21 -5022.65 5990977.92 716265.23 GYD-GC-MS 16050.00 66.19 334.53 8293.33 8233.53 11257.85 -5032.48 5990998.26 716254.79 GYD-GC-MS 16075.00 66.24 334.55 8303.41 8243.61 11278.50 -5042.32 5991018.61 716244.35 GYD-GC-MS 16100.00 66.28 334.58 8313.48 8253.68 11299.17 -5052.15 5991038.98 716233.92 GYD-GC-MS 16125.00 66.33 334.60 8323.52 8263.72 11319.85 -5061.97 5991059.36 716223.49 GYD-GC-MS 16150.00 66.31 334.41 8333.56 8273.76 11340.51 -5071.82 5991079.72 716213.03 GYD-GC-MS 16175.00 66.29 334.23 8343.61 8283.81 11361.15 -5081.74 5991100.05 716202.50 GYD-GC-MS 16200.00 66.26 334.04 8353.67 8293.87 11381.74 -5091.73 5991120.34 716191.91 GYD-GC-MS 16225.00 66.24 333.85 8363.74 8303.94 11402.30 -5101.78 5991140.59 716181.26 GYD-GC-MS 16250.00 66.27 333.82 8373.81 8314.01 11422.84 -5111.87 5991160.82 716170.56 GYD-GC-MS 16275.00 66.31 333.78 8383.86 8324.06 11443.37 -5121.98 5991181.05 716159.86 GYD-GC-MS 16300.00 66.34 333.75 8393.90 8334.10 11463.91 -5132.10 5991201.28 716149.13 GYD-GC-MS 16325.00 66.37 333.71 8403.93 8344.13 11484.45 -5142.23 5991221.50 716138.39 GYD-GC-MS 16350.00 66.42 333.62 8413.94 8354.14 11504.98 -5152.40 5991241.72 716127.63 GYD-GC-MS 16375.00 66.47 333.53 8423.93 8364.13 11525.50 -5162.59 5991261.93 716116.83 GYD-GC-MS 16400.00 66.53 333.43 8433.90 8374.10 11546.01 -5172.83 5991282.14 716105.99 GYD-GC-MS 16425.00 66.58 333.34 8443.84 8384.04 11566.52 -5183.11 5991302.33 716095.11 GYD-GC-MS 16450.00 66.54 333.45 8453.79 8393.99 11587.03 -5193.38 5991322.52 716084.24 GYD-GC-MS 16475.00 66.51 333.57 8463.75 8403.95 11607.55 -5203.61 5991342.73 716073.41 GYD-GC-MS 16500.00 66.47 333.68 8473.72 8413.92 11628.09 -5213.79 5991362.96 716062.62 GYD-GC-MS 16525.00 66.43 333.79 8483.71 8423.91 11648.64 -5223.93 5991383.20 716051.88 GYD-GC-MS 16550.00 66.46 333.70 8493.70 8433.90 11669.19 -5234.07 5991403.45 716041.14 GYD-GC-MS 16575.00 66.49 333.62 8503.68 8443.88 11689.74 -5244.24 5991423.68 716030.37 GYD-GC-MS 16600.00 66.51 333.53 8513.65 8453.85 11710.27 -5254.44 5991443.90 716019.56 GYD-GC-MS 16625.00 66.54 333.44 8523.60 8463.80 11730.79 -5264.68 5991464.10 716008.72 GYD-GC-MS ,Halliburton man Co p y Survey Report Company: 8P Amoco Field: Niakuk i Site: NK Main Pad Well: NK-14 Wcllpath: NK-14APB1 Survey Date: 5/9/2006 Time: 16:16:51 Page: 13 Co-ordinate(\E) Reference: WeII: NK-14, True North Vertical ('1'VD) Reference: 10:14 10/16/1993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Survey Calculation Method: Minimum Curvature Db: Oracle MD Incl Azim TVD Sys'fVD NlS E/W Map\ ___ MapE _ ~ Tool ~ ft deg deg ft ft ft ft ft ft 16650.00 66.59 333.50 8533.55 8473.75 11751.31 -5274.93 5991484.31 715997.87 GYD-GC-MS 16675.00 66.64 333.57 8543.47 8483.67 11771.85 -5285.15 5991504.54 715987.05 GYD-GC-MS 16700.00 66.69 333.63 8553.37 8493.57 11792.41 -5295.36 5991524.79 715976.24 GYD-GC-MS 16725.00 66.74 333.69 8563.25 8503.45 11812.99 -5305.55 5991545.06 715965.44 GYD-GC-MS 16750.00 66.83 333.75 8573.11 8513.31 11833.59 -5315.72 5991565.35 715954.67 GYD-GC-MS 16775.00 66.91 333.82 8582.93 8523.13 11854.22 -5325.88 5991585.67 715943.91 GYD-GC-MS 16800.00 67.00 333.88 8592.72 8532.92 11874.87 -5336.02 5991606.01 715933.16 GYD-GC-MS 16825.00 67.09 333.94 8602.47 8542.67 11895.54 -5346.14 5991626.37 715922.43 GYD-GC-MS 16850.00 67.01 333.99 8612.21 8552.41 11916.23 -5356.24 5991646.75 715911.72 GYD-GC-MS 16875.00 66.94 334.04 8621.99 8562.19 11936.91 -5366.32 5991667.12 715901.03 GYD-GC-MS 16900.00 66.86 334.08 8631.80 8572.00 11957.59 -5376.38 5991687.49 715890.37 GYD-GC-MS 16925.00 66.79 334.13 8641.64 8581.84 11978.26 -5386.42 5991707.86 715879.72 GYD-GC-MS 16950.00 66.66 333.97 8651.52 8591.72 11998.91 -5396.47 5991728.21 715869.07 GYD-GC-MS 16975.00 66.52 333.82 8661.45 8601.65 12019.52 -5406.57 5991748.50 715858.37 GYD-GC-MS 17000.00 66.39 333.66 8671.44 8611.64 12040.07 -5416.71 5991768.74 715847.63 GYD-GC-MS 17025.00 66.25 333.50 8681.48 8621.68 12060.57 -5426.89 5991788.94 715836.84 GYD-GC-MS 17050.00 66.29 333.48 8691.54 8631.74 12081.05 -5437.11 5991809.10 715826.02 GYD-GC-MS 17075.00 66.33 333.47 8701.58 8641.78 12101.54 -5447.33 5991829.27 715815.20 GYD-GC-MS 17100.00 66.38 333.45 8711.61 8651.81 12122.03 -5457.56 5991849.45 715804.36 GYD-GC-MS 17125.00 66.42 333.43 8721.62 8661.82 12142.52 -5467.81 5991869.63 715793.52 GYD-GC-MS 17150.00 66.53 333.46 8731.60 8671.80 12163.02 -5478.06 5991889.82 715782.67 GYD-GC-MS 17175.00 66.64 333.50 8741.53 8681.73 12183.55 -5488.30 5991910.03 715771.82 GYD-GC-MS 17200.00 66.75 333.53 8751.42 8691.62 12204.10 -5498.54 5991930.27 715760.98 GYD-GC-MS 17225.00 66.86 333.56 8761.27 8701.47 12224.67 -5508.78 5991950.53 715750.14 GYD-GC-MS 17250.00 67.04 333.60 8771.06 8711.26 12245.27 -5519.01 5991970.82 715739.30 GYD-GC-MS 17275.00 67.21 333.65 8780.78 8720.98 12265.91 -5529.24 5991991.15 715728.46 GYD-GC-MS 17300.00 67.39 333.69 8790.42 8730.62 12286.58 -5539.47 5992011.50 715717.63 GYD-GC-MS 17325.00 67.57 333.73 8800.00 8740.20 12307.28 -5549.70 5992031.90 715706.79 GYD-GC-MS 17350.00 67.74 333.53 8809.50 8749.70 12328.00 -5559.97 5992052.30 715695.91 GYD-GC-MS 17375.00 67.91 333.33 8818.94 8759.14 12348.71 -5570.33 5992072.69 715684.95 GYD-GC-MS 17400.00 68.07 333.13 8828.31 8768.51 12369.40 -5580.77 5992093.06 715673.90 GYD-GC-MS 17425.00 68.24 332.93 8837.61 8777.81 12390.08 -5591.29 5992113.42 715662.77 GYD-GC-MS 17450.00 68.26 332.92 8846.88 8787.08 12410.76 -5601.86 5992133.78 715651.60 GYD-GC-MS 17475.00 68.29 332.91 8856.13 8796.33 12431.44 -5612.43 5992154.13 715640.42 GYD-GC-MS 17500.00 68.31 332.90 8865.37 8805.57 12452.11 -5623.01 5992174.49 715629.23 GYD-GC-MS 17525.00 68.33 332.89 8874.61 8814.81 12472.79 -5633.60 5992194.85 715618.04 GYD-GC-MS 17550.00 68.26 332.85 8883.85 8824.05 12493.47 -5644.19 5992215.19 715606.84 GYD-GC-MS 17575.00 68.18 332.81 8893.13 8833.33 12514.12 -5654.79 5992235.52 715595.64 GYD-GC-MS 17600.00 68.10 332.76 8902.44 8842.64 12534.75 -5665.40 5992255.83 715584.42 GYD-GC-MS 17625.00 68.03 332.72 8911.78 8851.98 12555.37 -5676.02 5992276.12 715573.19 GYD-GC-MS 17650.00 67.89 332.53 8921.16 8861.36 12575.95 -5686.68 5992296.38 715561.94 GYD-GC-MS 17675.00 67.75 332.35 8930.60 8870.80 12596.47 -5697.39 5992316.57 715550.62 GYD-GC-MS 17700.00 67.60 332.16 8940.09 8880.29 12616.94 -5708.16 5992336.71 715539.26 GYD-GC-MS 17725.00 67.46 331.97 8949.65 8889.85 12637.35 -5718.98 5992356.79 715527.84 GYD-GC-MS 17750.00 67.64 331.85 8959.20 8899.40 12657.73 -5729.86 5992376.85 715516.36 GYD-GC-MS 17775.00 67.82 331.73 8968.67 8908.87 12678.12 -5740.79 5992396.90 715504.83 GYD-GC-MS 17800.00 67.99 331.61 8978.07 8918.27 12698.51 -5751.79 5992416.95 715493.24 GYD-GC-MS 17825.00 68.17 331.49 8987.41 8927.61 12718.90 -5762.84 5992437.01 715481.59 GYD-GC-MS 17850.00 68.08 331.67 8996.72 8936.92 12739.30 -5773.88 5992457.08 715469.95 GYD-GC-MS 17875.00 67.98 331.85 9006.07 8946.27 12759.73 -5784.85 5992477.17 715458.38 GYD-GC-MS 17900.00 67.89 332.03 9015.46 8955.66 12780.17 -5795.75 5992497.28 715446.88 GYD-GC-MS 17925.00 67.80 332.21 9024.89 8965.09 12800.64 -5806.57 5992517.42 715435.46 GYD-GC-MS 17950.00 67.46 332.22 9034.41 8974.61 12821.09 -5817.35 5992537.54 715424.08 GYD-GC-MS i i Halliburton Company Survey Report ', Company: BP Amoco Uate: 5/9/2006 Time: 16:16:51 Page: 14 ~~, Field: ~ Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North ~ Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Well: NK-14 Section (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) 1N'cllpath: NK-14AP61 Sun°ey Calcnlation Method: Minimum Curvature Db: Oracle Survcv IV1U Incl Azim TVD Sys'fVD N/S F,/W MapN MapE Tool ft deg deg ft ft ft ft ft ft 17975.00 67.12 332.22 9044.06 8984.26 12841.50 -5828.10 5992557.62 715412.73 GYD-GC-MS 18000.00 66.79 332.23 9053.85 8994.05 12861.85 -5838.82 5992577.65 715401.41 GYD-GC-MS 18025.00 66.45 332.23 9063.77 9003.97 12882.16 -5849.51 5992597.63 715390.13 GYD-GC-MS 18050.00 66.24 332.36 9073.80 9014.00 12902.43 -5860.16 5992617.57 715378.89 GYD-GC-MS 18075.00 66.03 332.50 9083.91 9024.11 12922.70 -5870.74 5992637.52 715367.71 GYD-GC-MS 18100.00 65.82 332.63 9094.11 9034.31 12942.95 -5881.26 5992657.46 715356.60 GYD-GC-MS 18125.00 65.61 332.76 9104.39 9044.59 12963.20 -5891.71 5992677.39 715345.55 GYD-GC-MS 18150.00 65.18 332.70 9114.80 9055.00 12983.41 -5902.12 5992697.27 715334.55 GYD-GC-MS 18175.00 64.74 332.65 9125.38 9065.58 13003.53 -5912.52 5992717.08 715323.56 GYD-GC-MS 18200.00 64.31 332.59 9136.13 9076.33 13023.57 -5922.90 5992736.80 715312.59 GYD-GC-MS 18216.00 64.03 332.55 9143.11 9083.31 13036.35 -5929.53 5992749.38 715305.58 MWD 18247.62 66.97 323.89 9156.24 9096.44 13060.76 -5944.69 5992773.33 715289.72 MWD 18277.06 72.86 316.02 9166.36 9106.56 13081.88 -5962.48 5992793.91 715271.31 MWD 18307.72 76.82 308.04 9174.39 9114.59 13101.66 -5984.45 5992813.03 715248.76 MWD 18337.98 79.89 300.40 9180.50 9120.70 13118.30 -6008.94 5992828.94 715223.79 MWD 18366.56 78.49 293.39 9185.87 9126.07 13130.99 -6033.96 5992840.89 715198.41 MWD 18397.31 76.99 286.05 9192.41 9132.61 13141.13 -6062.22 5992850.18 715169.86 MWD 18426.76 80.24 278.66 9198.23 9138.43 13147.29 -6090.40 5992855.51 715141.52 MWD 18459.99 85.08 268.29 9202.48 9142.68 13149.27 -6123.24 5992856.51 715108.63 MWD 18487.97 88.15 262.84 9204.14 9144.34 13147.11 -6151.07 5992853.53 715080.88 MWD 18535.03 95.33 244.40 9202.70 9142.90 13133.92 -6195.98 5992839.02 715036.38 MWD 18566.51 95.77 244.75 9199.65 9139.85 13120.47 -6224.28 5992824.74 715008.49 MWD 18599.97 93.66 239.11 9196.90 9137.10 13104.78 -6253.69 5992808.19 714979.56 MWD 18632.85 93.57 237.35 9194.82 9135.02 13087.51 -6281.59 5992790.10 714952.19 MWD 18665.58 93.48 231.00 9192.81 9133.01 13068.40 -6308.06 5992770.22 714926.29 MWD 18694.91 93.22 231.18 9191.10 9131.30 13050.01 -6330.85 5992751.16 714904.06 MWD 18729.65 93.30 228.54 9189.12 9129.32 13027.65 -6357.36 5992728.03 714878.22 MWD 18765.32 93.92 219.90 9186.87 9127.07 13002.16 -6382.16 5992701.82 714854.19 MWD 18798.31 94.27 215.85 9184.51 9124.71 12976.19 -6402.36 .5992675.27 714834.76 MWD 18829.42 94.36 213.56 9182.17 9122.37 12950.69 -6420.02 5992649.26 714817.87 MWD 18859.83 94.89 209.86 9179.72 9119.92 12924.91 -6435.95 5992623.02 714802.71 MWD 18890.36 95.24 203.69 9177.02 9117.22 12897.77 -6449.64 5992595.49 714789.82 MWD 18920.65 96.04 202.28 9174.04 9114.24 12870.02 -6461.41 5992567.41 714778.88 MWD 18960.48 96.04 193.47 9169.85 9110.05 12832.36 -6473.56 5992529.41 714767.85 MWD 18995.38 94.45 190.47 9166.65 9106.85 12798.37 -6480.77 5992495.22 714761.65 MWD 19020.34 93.39 188.01 9164.95 9105.15 12773.79 -6484.76 5992470.53 714758.39 MWD 19051.40 93.13 185.01 9163.18 9103.38 12742.99 -6488.28 5992439.64 714755.78 MWD 19084.71 93.30 178.49 9161.31 9101.51 12709.76 -6489.29 5992406.40 714755.75 MWD 19114.91 93.13 172.85 9159.62 9099.82 12679.71 -6487.02 5992376.43 714758.91 MWD 19143.83 92.78 173.38 9158.13 9098.33 12651.04 -6483.56 5992347.87 714763.22 MWD 19176.78 93.48 176.73 9156.33 9096.53 12618.26 -6480.72 5992315.20 714767.03 MWD 19202.37 94.10 174.26 9154.63 9094.83 12592.81 -6478.72 5992289.81 714769.78 MWD 19234.64 93.04 179.55 9152.62 9092.82 12560.66 -6476.98 5992257.73 714772.47 MWD 19269.91 92.86 184.66 9150.81 9091.01 12525.47 -6478.27 5992222.52 714772.22 MWD 19306.81 94.71 192.59 9148.37 9088.57 12489.10 -6483.79 5992186.01 714767.78 MWD 19335.60 94.10 193.47 9146.16 9086.36 12461.14 -6490.26 5992157.86 714762.14 MWD 19369.85 94.27 201.58 9143.65 9083.85 12428.59 -6500.53 5992125.03 714752.83 MWD 19400.75 95.86 205.81 9140.92 9081.12 12400.41 -6512.90 5992096.50 714741.30 MWD 19430.80 96.30 208.10 9137.74 9077.94 12373.78 -6526.44 5992069.48 714728.55 MWD 19461.57 95.86 213.21 9134.48 9074.68 12347.47 -6542.04 5992042.72 714713.74 MWD 19491.31 94.01 215.85 9131.92 9072.12 12323.06 -6558.83 5992017.83 714697.68 MWD 19527.01 92.78 224.13 9129.80 9070.00 12295.78 -6581.72 5991989.88 714675.62 MWD • • Halliburton Company Survey Report Company: BP Amoco llatc: 5/9/2006 Time: 16:16:51 Page: IS Field: Nia kuk Co-ordi nate(NE} Referen ce: Well: NK-14, True North Site: NK Mai n Pad Vertical (TVD) Reference: 10:14 1 0!16/1993 10:09 59.8 Well: NK -14 Section (VS) Reference: Well (O.OON, O.OOE,190.OOAzi) i Wellpath: NK -14APB1 Survey Calculation Meth od: Minimum Cu rvature Dh: Orade SUnc~ MD Inc! Azim TVD Sys TVD N/S E/W MapN MapE '1'001 ft deg deg ft ft ft ft ft ft 19560 .63 90. 40 228. 01 9128. 87 9069. 07 12272 .47 -6605 .91 5991965. 87 714652. 12 MWD 19599 .38 89. 25 224. 31 9128. 99 9069. 19 12245 .64 -6633 .86 5991938. 22 714624. 98 MWD 19649 .87 90. 75 220. 25 9128. 99? 9069. 19 ~ 12208 .29 -6667 .82 5991899. 89 714592. 14 MWD 19683 .15 90. 57 211. 62 9128. 60-~ 9068. 80 ~ 12181 .37 -6687 .33 5991872. 41 714573. 44 MWD 19723. 28 90. 75 206. 16 9128. 14 9068. 34 12146 .25 -6706 .71 5991836. 73 714555. 11 MWD 19751 .84 90. 22 204. 92 9127. 90 9068. 10 12120 .49 -6719 .02 5991810. 61 714543. 56 MWD 19786 .50 94. 27 201. 22 9126. 54 9066. 74 12088 .63 -6732 .59 5991778. 37 714530. 94 MWD 19821 .23 92. 33 199. 46 9124. 54 9064. 74 12056 .13 -6744 .64 5991745. 53 714519. 86 MWD 19849 .19 91. 81 195. 58 9123. 53 9063. 73 12029 .49 -6753 .05 5991718. 65 714512. 24 MWD 19877 .85 91. 72 191. 18 9122. 65 9062. 85 12001 .62 -6759 .67 5991690. 61 714506. 44 MWD 19907 .26 91. 28 188. 18 9121. 88 9062. 08 11972 .65 -6764 .62 5991661. 50 714502. 36 MWD 19937 .04 88. 63 186. 77 9121. 90 9062. 10 11943 .12 -6768 .49 5991631. 87 714499. 36 MWD 19966 .67 86. 61 184. 13 9123. 13 9063. 33 11913 .66 -6771 .30 5991602. 34 714497. 42 MWD 19997 .41 85. 11 179. 02 9125. 35 9065. 55 11883 .02 -6772 .15 5991571. 69 714497. 48 MWD 20028 .38 83. 00 176. 03 9128. 56 9068. 76 11852 .25 -6770 .82 5991540. 97 714499. 72 MWD 20058 .89 81. 85 172. 68 9132. 58 9072. 78 11822 .16 -6767 .84 5991510. 98 714503. 58 MWD 20088 .93 80. 70 172. 85 9137. 14 9077. 34 11792 .70 -6764 .11 5991481. 65 714508. 19 MWD 20124 .60 80. 26 168. 80 9143. 04 9083. 24 11757 .98 -6758 .50 5991447. 11 714514. 82 MWD 20155 .59 79. 91 160. 17 9148. 39 9088. 59 11728 .60 -6750 .34 5991417. 98 714523. 84 MWD 20185 .49 78. 59 157. 52 9153. 97 9094. 17 11701 .20 -6739 .74 5991390. 92 714535. 24 MWD 20216 .32 77. 36 153. 82 9160. 39 9100. 59 11673 .73 -6727 .32 5991363. 83 714548: 47 MWD 20246 .11 74. 36 154. 70 9167. 67 9107. 87 11647 .72 -6714 .78 5991338. 19 714561. 78 MWD 20276 .22 71. 01 155. 76 9176. 63 9116. 83 11621 .62 -6702 .74 5991312. 47 714574. 59 MWD 20305 .83 68. 81 159. 29 9186. 80 9127. 00 11595 .93 -6692 .10 5991287. 11 714585. 98 MWD 20335 .32 67. 93 161. 93 9197. 67 9137. 87 11570 .08 -6683 .00 5991261. 53 714595. 84 MWD 20367 .56 66. 43 162. 99 9210. 18 9150. 38 11541 .74 -6674 .04 5991233. 48 714605. 63 MWD 20397 .60 67. 14 168. 62 9222. 03 9162. 23 11514 .99 -6667 .28 5991206. 94 714613. 18 MWD 20427 .70 70. 84 174. 26 9232. 82 9173. 02 11487 .22 -6663 .12 5991179. 31 714618. 16 MWD 20456 .57 71. 45 175. 67 9242. 15 9182. 35 11460 .01 -6660 .72 5991152. 18 714621. 36 MWD 20486 .72 72. 07 179. 73 9251. 60 9191. 80 11431 .40 -6659 .57 5991123. 62 714623. 35 MWD 20516 .15 71. 89 183. 60 9260. 70 9200. 90 11403 .44 -6660 .39 5991095. 64 714623. 37 MWD 20541 .00 71. 89 183. 60 9268. 43 9208. 63 11379 .86 -6661. 87 5991072. 04 714622. 58 MWD • Halhburton Company Survey Report Company: BP Amoco llate: 5/9/2006 Timr. 16:19:50 Page: t ~'~ Field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North I Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16 /1993 10:09 59.8 Well: NK-14 Section (VS) Re ference: Well (O.OON,O.OOE,331.65Azi) Wellpath: NK-14A Survey Calculation Method: Minimum Curvature Db: Oracle Field: Niakuk North Slope UNITED STATES Map System:US State Pl ane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Well: NK-14 Slot Name: 14 NK-14 Well Position: +N/-S -1564.96 ft Northing: 5979894.64 ft Latitude: 70 20 50.455 N +E/-W 7022.88 ft Easting : 721617.74 ft Longitude: 148 12 2.773 W Position Uncertainty: 0.00 ft Wellpath: NK-14A Drilled From: NK-14AP61 500292266801 Tie-on Depth: 19143.83 ft Current Datum: 10: 14 10/16/1993 10:09 Height 59.80 ft Above System Datum: Mean Sea Level Magnetic Data: 5/3/2006 Declination : 24.79 deg Field Strength: 57629 nT Mag Dip Angle: 80.98 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 40.70 0.00 0.00 331.65 Survey Program for Definitive Wellpath Date: 5/3/2006 Validated: Yes Version: 1 Actual From To Survey Toolcode Tool Name ft ft 100.00 18200.00 Composite (100.00-18700.00) (0 GYD-GC-MS Gyrodata gyrocompassing m/s 18216.00 19143.83 MWD (18216.00-20541.00) (1) MWD MWD -Standard 19150.00 19660.00 MWD (19150.00-19660.00) MWD MWD -Standard Survey MD Licl Azim TVD Sys TVD N/S E/W MapN MapE Tool ft deg deg ft ft ft ft _ ft _ ft 40.70 0.00 0.00 40.70 -19.10 0.00 0.00 5979894.64 721617.74 TIE LINE 100.00 0.16 9.45 100.00 40.20 0.08 0.01 5979894.72 721617.75 GYD-GC-MS 200.00 0.17 324.98 200.00 140.20 0.34 -0.05 5979894.98 721617.68 GYD-GC-MS 300.00 0.19 302.71 300.00 240.20 0.55 -0.27 5979895.18 721617.45 GYD-GC-MS 400.00 0.23 279.56 400.00 340.20 0.67 -0.61 5979895.29 721617.11 GYD-GC-MS 500.00 0.31 235.20 500.00 440.20 0.55 -1.03 5979895.16 721616.69 GYD-GC-MS 600.00 0.31 214.90 600.00 540.20 0.18 -1.41 5979894.77 721616.33 GYD-GC-MS 700.00 0.32 232.76 699.99 640.19 -0.21 -1.78 5979894.37 721615.96 GYD-GC-MS 800.00 0.23 248.74 799.99 740.19 -0.46 -2.19 5979894.12 721615.56 GYD-GC-MS 900.00 0.42 305.76 899.99 840.19 -0.31 -2.68 5979894.25 721615.07 GYD-GC-MS 1000.00 0.85 328.91 999.99 940.19 0.54 -3.36 5979895.07 721614.36 GYD-GC-MS 1100.00 1.57 332.03 1099.96 1040.16 2.38 -4.38 5979896.89 721613.29 GYD-GC-MS 1200.00 1.86 332.92 1199.92 1140.12 5.04 -5.77 5979899.50 721611.83 GYD-GC-MS 1300.00 2.29 333.44 1299.85 1240.05 8.27 -7.40 5979902.68 721610.10 GYD-GC-MS 1400.00 3.01 332.46 1399.74 1339.94 12.38 -9.51 5979906.73 721607.87 GYD-GC-MS 1500.00 3.63 332.93 1499.58 1439.78 17.53 -12.16 5979911.80 721605.07 GYD-GC-MS 1600.00 4.74 335.39 1599.31 1539.51 24.11 -15.32 5979918.28 721601.71 GYD-GC-MS 1700.00 5.86 338.10 1698.88 1639.08 32.60 -18.95 5979926.66 721597.84 GYD-GC-MS 1800.00 7.17 341.39 1798.23 1738.43 43.25 -22.84 5979937.19 721593.63 GYD-GC-MS 1900.00 10.03 342.63 1897.10 1837.30 57.48 -27.43 5979951.28 721588.62 GYD-GC-MS 2000.00 12.42 343.96 1995.18 1935.38 76.13 -33.01 5979969.75 721582.50 GYD-GC-MS 2025.00 12.99 343.83 2019.56 1959.76 81.41 -34.53 5979974.99 721580.82 GYD-GC-MS 2050.00 13.56 343.66 2043.90 1984.10 86.92 -36.14 5979980.45 721579.05 GYD-GC-MS 2075.00 14.13 343.48 2068.17 2008.37 92.66 -37.83 5979986.13 721577.19 GYD-GC-MS 2100.00 14.70 343.31 2092.38 2032.58 98.62 -39.61 5979992.04 721575.23 GYD-GC-MS 2125.00 15.31 343.10 2116.53 2056.73 104.82 -41.48 5979998.18 721573.18 GYD-GC-MS 2150.00 15.94 343.41 2140.61 2080.81 111.27 -43.42 5980004.57 721571.05 GYD-GC-MS 2175.00 16.17 343.64 2164.63 2104.83 117.90 -45.38 5980011.14 721568.89 GYD-GC-MS • - Halhburton Company Survey Report ~ '; ~' Company: BP Amoco Field: Niakuk Site: NK Main Pad Well: NK-14 ~Wellpath: NK-14A Su r~ c~ Date: 5/9/2006 Co-ordinatc(NE) Reference: Vertical (TVD) Reference: Section (VS) Reference: Survey Calculation Method: Time: 16:19:50 Page: 2 Well: NK-14, True North 10:14 10/16/1993 10:09 59.8 Well (O.OON,O.OOE,331.65Azi) Minimum Curvature Db: Or2Cle MD Incl Azim TVll Sys TVD M11S E/W MapN MapE Tool j ft deg deg ft ft ft ft ft ft 2200.00 16.77 343.05 2188.61 2128.81 124.69 -47.41 5980017.86 721566.66 GYD-GC-MS 2225.00 17.43 342.47 2212.50 2152.70 131.71 -49.59 5980024.82 721564.28 GYD-GC-MS 2250.00 17.93 342.41 2236.32 2176.52 138.95 -51.88 5980031.98 721561.77 GYD-GC-MS 2275.00 18.62 342.03 2260.06 2200.26 146.41 -54.28 5980039.37 721559.16 GYD-GC-MS 2300.00 19.10 341.75 2283.72 2223.92 154.09 -56.79 5980046.98 721556.42 GYD-GC-MS 2325.00 19.98 341.25 2307.28 2247.48 162.02 -59.44 5980054.82 721553.53 GYD-GC-MS 2350.00 20.87 341.03 2330.70 2270.90 170.28 -62.26 5980062.99 721550.47 GYD-GC-MS 2375.00 21.33 341.02 2354.03 2294.23 178.79 -65.19 5980071.41 721547.29 GYD-GC-MS 2400.00 22.15 340.50 2377.25 2317.45 187.53 -68.24 5980080.06 721543.98 GYD-GC-MS 2425.00 22.79 340.16 2400.35 2340.55 196.53 -71.46 5980088.96 721540.50 GYD-GC-MS 2450.00 23.63 339.66 2423.33 2363.53 205.78 -74.84 5980098.11 721536.85 GYD-GC-MS 2475.00 24.49 339.12 2446.16 2386.36 215.32 -78.43 5980107.54 721532.98 GYD-GC-MS 2500.00 25.05 338.82 2468.86 2409.06 225.10 -82.19 5980117.20 721528.93 GYD-GC-MS 2525.00 26.21 338.09 2491.40 2431.60 235.15 -86.16 5980127.13 721524.66 GYD-GC-MS 2550.00 26.95 337.72 2513.75 2453.95 245.52 -90.37 5980137.37 721520.15 GYD-GC-MS 2575.00 27.71 337.42 2535.96 2476.16 256.13 -94.75 5980147.84 721515.46 GYD-GC-MS 2600.00 28.63 336.95 2558.00 2498.20 267.01 -99.33 5980158.58 721510.56 GYD-GC-MS 2625.00 29.27 336.75 2579.88 2520.08 278.13 -104.09 5980169.56 721505.48 GYD-GC-MS 2650.00 30.31 336.43 2601.57 2541.77 289.53 -109.02 5980180.81 721500.21 GYD-GC-MS 2675.00 30.97 336.17 2623.08 2563.28 301.20 -114.14 5980192.31 721494.74 GYD-GC-MS 2700.00 31.72 336.14 2644.43 2584.63 313.09 -119.40 5980204.05 721489.14 GYD-GC-MS 2725.00 32.50 336.11 2665.61 2605.81 325.24 -124.78 5980216.03 721483.40 GYD-GC-MS 2750.00 33.26 336.13 2686.60 2626.80 337.65 -130.27 5980228.28 721477.54 GYD-GC-MS 2775.00 34.16 336.09 2707.40 2647.60 350.34 -135.89 5980240.79 721471.55 GYD-GC-MS 2800.00 34.58 336.09 2728.04 2668.24 363.24 -141.61 5980253.52 721465.45 GYD-GC-MS 2825.00 35.15 336.11 2748.55 2688.75 376.31 -147.40 5980266.40 721459.28 GYD-GC-MS 2850.00 35.65 336.12 2768.93 2709.13 389.55 -153.26 5980279.47 721453.03 GYD-GC-MS 2875.00 36.04 336.18 2789.19 2729.39 402.94 -159.18 5980292.68 721446.72 GYD-GC-MS 2900.00 36.58 336.21 2809.34 2749.54 416.48 -165.16 5980306.04 721440.34 GYD-GC-MS 2925.00 37.29 336.28 2829.32 2769.52 430.23 -171.21 5980319.60 721433.89 GYD-GC-MS 2950.00 38.00 336.29 2849.11 2789.31 444.21 -177.35 5980333.39 721427.34 GYD-GC-MS 2975.00 38.49 336.23 2868.75 2808.95 458.38 -183.58 5980347.37 721420.69 GYD-GC-MS 3000.00 38.97 336.37 2888.25 2828.45 472.70 -189.87 5980361.50 721413.98 GYD-GC-MS 3025.00 39.49 336.29 2907.62 2847.82 487.18 -196.22 5980375.78 721407.21 GYD-GC-MS 3050.00 40.19 336.21 2926.81 2867.01 501.84 -202.67 5980390.24 721400.33 GYD-GC-MS 3075.00 40.98 336.15 2945.80 2886.00 516.72 -209.24 5980404.92 721393.32 GYD-GC-MS 3100.00 41.94 335.94 2964.53 2904.73 531.85 -215.96 5980419.84 721386.16 GYD-GC-MS 3125.00 42.80 335.71 2983.00 2923.20 547.22 -222.86 5980435.00 721378.81 GYD-GC-MS 3150.00 43.94 335.26 3001.18 2941.38 562.83 -229.98 5980450.40 721371.23 GYD-GC-MS 3175.00 45.10 334.93 3019.00 2959.20 578.73 -237.36 5980466.07 721363.38 GYD-GC-MS 3200.00 46.30 334.57 3036.46 2976.66 594.92 -245.00 5980482.02 721355.27 GYD-GC-MS 3225.00 47.42 334.39 3053.56 2993.76 611.38 -252.85 5980498.24 721346.93 GYD-GC-MS 3250.00 48.19 334.37 3070.35 3010.55 628.08 -260.86 5980514.70 721338.43 GYD-GC-MS 3275.00 49.37 334.53 3086.82 3027.02 645.04 -268.97 5980531.42 721329.82 GYD-GC-MS 3300.00 50.25 334.92 3102.95 3043.15 662.31 -277.13 5980548.44 721321.16 GYD-GC-MS 3325.00 51.00 334.98 3118.81 3059.01 679.82 -285.31 5980565.69 721312.46 GYD-GC-MS 3350.00 51.79 335.44 3134.41 3074.61 697.56 -293.50 5980583.18 721303.75 GYD-GC-MS 3375.00 52.32 335.60 3149.78 3089.98 715.50 -301.67 5980600.87 721295.06 GYD-GC-MS 3400.00 52.81 335.80 3164.98 3105.18 733.59 -309.84 5980618.71 721286.36 GYD-GC-MS 3425.00 53.32 336.15 3180.00 3120.20 751.84 -317.97 5980636.72 721277.69 GYD-GC-MS 3450.00 53.83 336.26 3194.85 3135.05 770.25 -326.09 5980654.87 721269.03 GYD-GC-MS 3475.00 54.45 336.64 3209.49 3149.69 788.82 -334.18 5980673.20 721260.39 GYD-GC-MS i - Halhburton Company Survey Report Company: BP Amoco Field: Niakuk Site: NK Main Pad Well: NK-14 Wellpath: NK-14A Date: 5/9/2006 Co-ordinate(NE) Reference: Vertical (TVD) Reference: Section (VS) Keference: Survey Calculation Method: Time: 16:19:50 Nage: 3 Well: NK-14, True North 10:14 10/16/1993 10:09 59.8 WeII (O.OON,O.OOE,331.65Azi) Minimum Curvature Db: Oracle Surcc~~ MD Jncl Azim TVD Sys"CVD N/S E/W MapA MapE Tool ft deg deg ft ft ft ft ft ft 3500.00 54.97 336.86 3223.94 3164.14 807.57 -342.24 5980691.70 721251.78 GYD-GC-MS 3525.00 55.51 337.14 3238.19 3178.39 826.48 -350.26 5980710.36 721243.20 GYD-GC-MS 3550.00 56.07 337.51 3252.25 3192.45 845.55 -358.23 5980729.19 721234.67 GYD-GC-MS 3575.00 56.71 337.60 3266.08 3206.28 864.80 -366.18 5980748.19 721226.16 GYD-GC-MS 3600.00 57.35 337.91 3279.69 3219.89 884.21 -374.12 5980767.36 721217.65 GYD-GC-MS 3625.00 57.95 338.05 3293.07 3233.27 903.79 -382.04 5980786.70 721209.16 GYD-GC-MS 3650.00 58.60 338.23 3306.21 3246.41 923.52 -389.96 5980806.19 721200.66 GYD-GC-MS 3675.00 59.04 338.37 3319.15 3259.35 943.40 -397.87 5980825.82 721192.17 GYD-GC-MS 3700.00 59.56 338.46 3331.92 3272.12 963.39 -405.78 5980845.56 721183.67 GYD-GC-MS 3725.00 59.20 338.39 3344.65 3284.85 983.39 -413.69 5980865.33 721175.17 GYD-GC-MS 3750.00 58.18 338.27 3357.64 3297.84 1003.24 -421.57 5980884.93 721166.70 GYD-GC-MS 3775.00 57.47 338.54 3370.96 3311.16 1022.92 -429.36 5980904.37 721158.34 GYD-GC-MS 3800.00 56.18 338.95 3384.64 3324.84 1042.42 -436.95 5980923.63 721150.18 GYD-GC-MS 3825.00 55.54 339.00 3398.67 3338.87 1061.73 -444.37 5980942.72 721142.19 GYD-GC-MS 3850.00 54.77 339.05 3412.95 3353.15 1080.89 -451.72 5980961.65 721134.28 GYD-GC-MS 3875.00 54.03 339.25 3427.50 3367.70 1099.89 -458.95 5980980.42 721126.49 GYD-GC-MS 3900.00 53.48 339.54 3442.28 3382.48 1118.76 -466.05 5980999.08 721118.83 GYD-GC-MS 3925.00 53.52 339.91 3457.15 3397.35 1137.61 -473.01 5981017.71 721111.32 GYD-GC-MS 3950.00 54.06 339.93 3471.92 3412.12 1156.56 -479.94 5981036.45 721103.83 GYD-GC-MS 3975.00 54.46 340.09 3486.53 3426.73 1175.63 -486.87 5981055.30 721096.34 GYD-GC-MS 4000.00 54.97 340.08 3500.97 3441.17 1194.81 -493.82 5981074.27 721088.82 GYD-GC-MS 4025.00 54.55 340.57 3515.39 3455.59 1214.04 -500.70 5981093.29 721081.38 GYD-GC-MS 4050.00 54.91 340.63 3529.83 3470.03 1233.29 -507.48 5981112.33 721074.04 GYD-GC-MS 4075.00 55.15 340.88 3544.16 3484.36 1252.63 -514.23 5981131.46 721066.72 GYD-GC-MS 4100.00 55.65 341.12 3558.35 3498.55 1272.09 -520.93 5981150.71 721059.44 GYD-GC-MS 4125.00 56.07 341.40 3572.38 3512.58 1291.68 -527.58 5981170.10 721052.22 GYD-GC-MS 4150.00 56.72 341.45 3586.22 3526.42 1311.42 -534.21 5981189.63 721045.01 GYD-GC-MS 4175.00 57.44 341.42 3599.81 3540.01 1331.31 -540.89 5981209.32 721037.74 GYD-GC-MS 4200.00 58.16 341.48 3613.13 3553.33 1351.37 -547.62 5981229.16 721030.42 GYD-GC-MS 4225.00 58.83 341.41 3626.19 3566.39 1371.58 -554.41 5981249.16 721023.04 GYD-GC-MS 4250.00 59.33 341.26 3639.04 3579.24 1391.90 -561.27 5981269.27 721015.58 GYD-GC-MS 4275.00 59.54 340.96 3651.75 3591.95 1412.26 -568.24 5981289.42 721008.01 GYD-GC-MS 4300.00 59.93 340.71 3664.35 3604.55 1432.66 -575.33 5981309.59 721000.33 GYD-GC-MS 4325.00 60.15 340.43 3676,84 3617.04 1453.08 -582.53 5981329.80 720992.52 GYD-GC-MS 4350.00 60.52 340.25 3689.21 3629.41 1473.54 -589.84 5981350.03 720984.61 GYD-GC-MS 4375.00 60.82 340.03 3701.45 3641.65 1494.04 -597.24 5981370.30 720976.60 GYD-GC-MS 4400.00 61.33 339.91 3713.55 3653.75 1514.60 -604.74 5981390.62 720968.50 GYD-GC-MS 4425.00 61.90 339.75 3725.43 3665.63 1535.24 -612.32 5981411.04 720960.31 GYD-GC-MS 4450.00 62.22 339.49 3737.14 3677.34 1555.95 -620.01 5981431.50 720952.01 GYD-GC-MS 4475.00 62.68 339.36 3748.71 3688.91 1576.70 -627.80 5981452.01 720943.61 GYD-GC-MS 4500.00 63.25 339.18 3760.07 3700.27 1597.52 -635.69 5981472.60 720935.12 GYD-GC-MS 4525.00 63.84 338.96 3771.21 3711.41 1618.43 -643.68 5981493.25 720926.51 GYD-GC-MS 4550.00 64.20 338.65 3782.16 3722.36 1639.38 -651.81 5981513.96 720917.77 GYD-GC-MS 4575.00 64.94 338.58 3792.90 3733.10 1660.41 -660.04 5981534.73 720908.92 GYD-GC-MS 4600.00 65.75 338.54 3803.32 3743.52 1681.55 -668.35 5981555.62 720899.99 GYD-GC-MS 4625.00 66.31 338.44 3813.48 3753.68 1702.81 -676.72 5981576.62 720890.99 GYD-GC-MS 4650.00 66.77 338.46 3823.43 3763.63 1724.14 -685.14 5981597.69 720881.94 GYD-GC-MS 4675.00 66.91 338.43 3833.27 3773.47 1745.52 -693.59 5981618.80 720872.87 GYD-GC-MS 4700.00 66.88 338.26 3843.08 3783.28 1766.89 -702.07 5981639.91 720863.76 GYD-GC-MS 4725.00 67.33 338.14 3852.80 3793.00 1788.27 -710.63 5981661.03 720854.57 GYD-GC-MS 4750.00 67.39 337.59 3862.43 3802.63 1809.64 -719.32 5981682.14 720845.25 GYD-GC-MS 4775.00 67.44 337.13 3872.03 3812.23 1830.95 -728.21 5981703.17 720835.74 GYD-GC-MS 4800.00 67.21 336.61 3881.66 3821.86 1852.16 -737.27 5981724.11 720826.06 GYD-GC-MS lli Ha burton Company Survey Report Company: BP Amoco Field: Niakuk Site: NK Main Pad Well: NK-14 Wellpath: NK-14A llatc: 5/9/2006 Time: 16:19:50 Nage: 4 Cu-ordinate(NE) Reference: WeII: NK-14, True North Vertical (TVD) Reference: 10:14 10116!1993 10:09 59.8 Section (VS) Reference: WeII (O.OON,O.OOE,331.65Azi) Survey Calculation Method: Minimum Curvature Dt,: Oracle _- -- Surve~ ~ _ _- r__ Mll _ _ [ncI - - Azim "I~Vll _ _ Sys TVD - -- ti/S .. E1W __ MapN _ MapE _.. _ __ - -- Tool ft deg deg ft ft ft ft ft ft 4825.00 67.03 335.93 3891.38 3831.58 1873.25 -746.54 5981744.91 720816.17 GYD-GC-MS 4850.00 67.24 335.43 3901.10 3841.30 1894.24 -756.02 5981765.61 720806.07 GYD-GC-MS 4875.00 67.18 334.75 3910.78 3850.98 1915.14 -765.73 5981786.22 720795.75 GYD-GC-MS 4900.00 67.26 334.39 3920.46 3860.66 1935.96 -775.63 5981806.73 720785.24 GYD-GC-MS 4925.00 67.24 334.15 3930.13 3870.33 1956.73 -785.64 5981827.19 720774.62 GYD-GC-MS 4950.00 67.11 334.20 3939.83 3880.03 1977.47 -795.68 5981847.63 720763.97 GYD-GC-MS 4975.00 67.23 334.22 3949.53 3889.73 1998.21 -805.70 5981868.07 720753.34 GYD-GC-MS 5000.00 66.93 334.28 3959.26 3899.46 2018.95 -815.70 5981888.50 720742.73 GYD-GC-MS 5025.00 66.73 334.30 3969.10 3909.30 2039.66 -825.68 5981908.90 720732.15 GYD-GC-MS 5050.00 66.64 334.38 3979.00 3919.20 2060.36 -835.62 5981929.29 720721.60 GYD-GC-MS 5075.00 66.19 334.51 3989.00 3929.20 2081.03 -845.50 5981949.66 720711.11 GYD-GC-MS 5100.00 66.23 334.58 3999.08 3939.28 2101.68 -855.33 5981970.02 720700.67 GYD-GC-MS 5125.00 66.01 334.57 4009.20 3949.40 2122.33 -865.15 5981990.36 720690.25 GYD-GC-MS 5150.00 66.15 334.65 4019.34 3959.54 2142.97 -874.95 5982010.71 720679.85 GYD-GC-MS 5175.00 66.03 334.61 4029.47 3969.67 2163.62 -884.74 5982031.06 720669.45 GYD-GC-MS 5200.00 65.81 334.48 4039.67 3979.87 2184.23 -894.55 5982051.37 720659.03 GYD-GC-MS 5225.00 66.39 334.56 4049.80 3990.00 2204.87 -904.38 5982071.70 720648.60 GYD-GC-MS 5250.00 66.63 334.48 4059.77 3999.97 2225.56 -914.24 5982092.10 720638.13 GYD-GC-MS 5275.00 66.76 334.41 4069.66 4009.86 2246.28 -924.15 5982112.51 720627.61 GYD-GC-MS 5300.00 66.88 334.48 4079.50 4019.70 2267.01 -934.06 5982132.94 720617.09 GYD-GC-MS 5325.00 66.85 334.42 4089.32 4029.52 2287.75 -943.98 5982153.38 720606.57 GYD-GC-MS 5350.00 67.32 334.42 4099.05 4039.25 2308.52 -953.92 5982173.84 720596.02 GYD-GC-MS 5375.00 67.43 334.38 4108.67 4048.87 2329.33 -963.89 5982194.35 720585.43 GYD-GC-MS 5400.00 67.50 334.32 4118.25 4058.45 2350.15 -973.89 5982214.86 720574.83 GYD-GC-MS 5425.00 67.68 334.34 4127.78 4067.98 2370.98 -983.90 5982235.38 720564.21 GYD-GC-MS 5450.00 67.56 334.32 4137.30 4077.50 2391.82 -993.91 5982255.91 720553.58 GYD-GC-MS 5475.00 67.82 334.34 4146.79 4086.99 2412.66 -1003.93 5982276.45 720542.95 GYD-GC-MS 5500.00 67.74 334.36 4156.25 4096.45 2433.52 -1013.95 5982297.01 720532.32 GYD-GC-MS 5525.00 67.82 334.40 4165.70 4105.90 2454.39 -1023.96 5982317.57 720521.70 GYD-GC-MS 5550.00 68.03 334.43 4175.10 4115.30 2475.29 -1033.96 5982338.16 720511.08 GYD-GC-MS 5575.00 68.01 334.53 4184.45 4124.65 2496.21 -1043.95 5982358.78 720500.48 GYD-GC-MS 5600.00 68.11 334.54 4193.79 4133.99 2517.15 -1053.92 5982379.41 720489.90 GYD-GC-MS 5625.00 67.97 334.50 4203.14 4143.34 2538.08 -1063.89 5982400.03 720479.31 GYD-GC-MS 5650.00 67.70 334.53 4212.57 4152.77 2558.98 -1073.86 5982420.63 720468.73 GYD-GC-MS 5675.00 67.43 334.48 4222.12 4162.32 2579.83 -1083.80 5982441.18 720458.17 GYD-GC-MS 5700.00 67.10 334.51 4231.78 4171.98 2600.64 -1093.73 5982461.69 720447.63 GYD-GC-MS 5725.00 67.09 334.53 4241.51 4181.71 2621.43 -1103.64 5982482.18 720437.12 GYD-GC-MS 5750.00 66.82 334.46 4251.29 4191.49 2642.20 -1113.54 5982502.64 720426.60 GYD-GC-MS 5775.00 66.81 334.52 4261.14 4201.34 2662.94 -1123.44 5982523.07 720416.10 GYD-GC-MS 5800.00 66.62 334.58 4271.02 4211.22 2683.67 -1133.31 5982543.51 720405.62 GYD-GC-MS 5825.00 66.44 334.64 4280.98 4221.18 2704.39 -1143.14 5982563.92 720395.18 GYD-GC-MS 5850.00 66.45 334.58 4290.97 4231.17 2725.09 -1152.97 5982584.33 720384.75 GYD-GC-MS 5875.00 66.37 334.59 4300.97 4241.17 2745.79 -1162.80 5982604.72 720374.31 GYD-GC-MS 5900.00 66.36 334.51 4310.99 4251.19 2766.47 -1172.64 5982625.10 720363.86 GYD-GC-MS 5925.00 66.37 334.61 4321.02 4261.22 2787.15 -1182.48 5982645.48 720353.41 GYD-GC-MS 5950.00 66.46 334.64 4331.02 4271.22 2807.85 -1192.30 5982665.88 720342.99 GYD-GC-MS 5975.00 66.61 334.64 4340.97 4281.17 2828.57 -1202.12 5982686.30 720332.56 GYD-GC-MS 6000.00 66.59 334.69 4350.90 4291.10 2849.31 -1211.94 5982706.74 720322.13 GYD-GC-MS 6025.00 66.64 334.75 4360.83 4301.03 2870.06 -1221.74 5982727.19 720311.72 GYD-GC-MS 6050.00 66.70 334.68 4370.73 4310.93 2890.81 -1231.54 5982747.65 720301.31 GYD-GC-MS 6075.00 66.70 334.71 4380.61 4320.81 2911.57 -1241.36 5982768.10 720290.88 GYD-GC-MS 6100.00 66.83 334.65 4390.48 4330.68 2932.34 -1251.18 5982788.57 720280.45 GYD-GC-MS a - . ~ - Halhburton Company Survey Report __ Company: BP Amoco - Date: 5/9/2006 ' __ __ Dime: 16:19:50 Page: 5 Field: Nia kuk Co-ordinatc(lYE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (9'Vll ) Reference: 10:14 10/1611 993 10:09 59.8 ~ Nell: NK -14 Section (VS) Keference: Well (O.OON,O.OOE,331.65Azi) f Wellpath: NK-14A Survey Calculation Method: Minimum Cu rvature Db: Oracle Survey MD Incl Azim T~'D Sys TVD N/S E/W Map\ 1~1apE Tool ft deg deg ft ft ft ft ft ft 6125.00 66.67 334.59 4400.35 4340.55 2953.09 -1261.03 5982809.02 720270.00 GYD-GC-MS 6150.00 66.52 334.67 4410.28 4350.48 2973.82 -1270.86 5982829.45 720259.56 GYD-GC-MS 6175.00 66.48 334.78 4420.25 4360.45 2994.55 -1280.65 5982849.88 720249.16 GYD-GC-MS 6200.00 66.46 334.72 4430.23 4370.43 3015.28 -1290.42 5982870.31 720238.78 GYD-GC-MS 6225.00 66.44 334.69 4440.21 4380.41 3036.00 -1300.22 5982890.73 720228.37 GYD-GC-MS 6250.00 66.40 334.69 4450.22 4390.42 3056.72 -1310.01 5982911.15 720217.97 GYD-GC-MS 6275.00 66.06 334.71 4460.29 4400.49 3077.40 -1319.79 5982931.53 720207.59 GYD-GC-MS 6300.00 65.94 334.81 4470.46 4410.66 3098.06 -1329.53 5982951.89 720197.24 GYD-GC-MS 6325.00 65.93 334.92 4480.66 4420.86 3118.73 -1339.22 5982972.26 720186.94 GYD-GC-MS 6350.00 66.29 334.96 4490.78 4430.98 3139.43 -1348.91 5982992.67 720176.65 GYD-GC-MS 6375.00 66.37 335.07 4500.82 4441.02 3160.19 -1358.58 5983013.13 720166.37 GYD-GC-MS 6400.00 66.23 334.79 4510.87 4451.07 3180.92 -1368.28 5983033.57 720156.06 GYD-GC-MS 6425.00 66.11 334.53 4520.97 4461.17 3201.59 -1378.06 5983053.94 720145.67 GYD-GC-MS 6450.00 65.62 334.45 4531.19 4471.39 3222.18 -1387.89 5983074.23 720135.24 GYD-GC-MS 6475.00 66.19 334.42 4541.39 4481.59 3242.77 -1397.74 5983094.51 720124.79 GYD-GC-MS 6500.00 66.19 334.32 4551.49 4491.69 3263.39 -1407.63 5983114.83 720114.29 GYD-GC-MS 6525.00 66.32 334.26 4561.55 4501.75 3284.01 -1417.56 5983135.15 720103.76 GYD-GC-MS 6550.00 65.97 334.10 4571.66 4511.86 3304.59 -1427.52 5983155.43 720093.19 GYD-GC-MS 6575.00 65.99 333.98 4581.84 4522.04 3325.12 -1437.51 5983175.65 720082.60 GYD-GC-MS 6600.00 65.99 333.77 4592.01 4532.21 3345.62 -1447.57 5983195.85 720071.94 GYD-GC-MS 6625.00 65.92 333.74 4602.20 4542.40 3366.10 -1457.67 5983216.02 720061.24 GYD-GC-MS 6650.00 65.85 333.71 4612.41 4552.61 3386.56 -1467.77 5983236.17 720050.54 GYD-GC-MS 6675.00 65.89 333.61 4622.63 4562.83 3407.01 -1477.89 5983256.31 720039.82 GYD-GC-MS 6700.00 65.82 333.47 4632.86 4573.06 3427.43 -1488.05 5983276.42 720029.05 GYD-GC-MS 6725.00 65.92 333.43 4643.08 4583.28 3447.84 -1498.25 5983296.52 720018.26 GYD-GC-MS 6750.00 65.84 333.35 4653.30 4593.50 3468.24 -1508.47 5983316.61 720007.44 GYD-GC-MS 6775.00 65.68 333.32 4663.56 4603.76 3488.61 -1518.70 5983336.66 719996.61 GYD-GC-MS 6800.00 65.63 333.46 4673.87 4614.07 3508.98 -1528.91 5983356.72 719985.81 GYD-GC-MS 6825.00 65.96 333.59 4684.12 4624.32 3529.39 -1539.07 5983376.82 719975.05 GYD-GC-MS 6850.00 65.65 333.56 4694.36 4634.56 3549.81 -1549.22 5983396.93 719964.30 GYD-GC-MS 6875.00 65.72 333.64 4704.66 4644.86 3570.22 -1559.35 5983417.03 719953.57 GYD-GC-MS 6900.00 65.50 333.57 4714.98 4655.18 3590.61 -1569.47 5983437.11 719942.85 GYD-GC-MS 6925.00 65.45 333.56 4725.36 4665.56 3610.98 -1579.60 5983457.17 719932.13 GYD-GC-MS 6950.00 65.25 333.38 4735.78 4675.98 3631.31 -1589.75 5983477.19 719921.38 GYD-GC-MS 6975.00 65.50 333.29 4746.20 4686.40 3651.62 -1599.94 5983497.19 719910.59 GYD-GC-MS 7000.00 65.38 333.21 4756.59 4696.79 3671.92 -1610.18 5983517.18 719899.76 GYD-GC-MS 7025.00 65.30 333.12 4767.02 4707.22 3692.19 -1620.43 5983537.14 719888.91 GYD-GC-MS 7050.00 65.51 333.10 4777.43 4717.63 3712.47 -1630.72 5983557.10 719878.03 GYD-GC-MS 7075.00 65.20 333.00 4787.85 4728.05 3732.72 -1641.01 5983577.04 719867.14 GYD-GC-MS 7100.00 65.54 333.07 4798.27 4738.47 3752.98 -1651.32 5983596.98 719856.24 GYD-GC-MS 7125.00 65.37 333.05 4808.66 4748.86 3773.25 -1661.62 5983616.94 719845.34 GYD-GC-MS 7150.00 65.23 332.96 4819.10 4759.30 3793.49 -1671.93 5983636.86 719834.44 GYD-GC-MS 7175.00 65.26 332.96 4829.57 4769.77 3813.71 -1682.25 5983656.77 719823.53 GYD-GC-MS 7200.00 65.21 332.91 4840.04 4780.24 3833.92 -1692.58 5983676.67 719812.61 GYD-GC-MS 7225.00 64.95 333.02 4850.58 4790.78 3854.12 -1702.89 5983696.55 719801.71 GYD-GC-MS 7250.00 64.63 333.05 4861.23 4801.43 3874.28 -1713.14 5983716.40 719790.86 GYD-GC-MS 7275.00 64.21 333.21 4872.02 4812.22 3894.39 -1723.33 5983736.20 719780.08 GYD-GC-MS 7300.00 63.79 333.30 4882.98 4823.18 3914.46 -1733.45 5983755.96 719769.38 GYD-GC-MS 7325.00 63.66 333.43 4894.05 4834.25 3934.50 -1743.50 5983775.69 719758.74 GYD-GC-MS 7350.00 64.21 333.61 4905.03 4845.23 3954.60 -1753.51 5983795.48 719748.14 GYD-GC-MS 7375.00 64.45 333.63 4915.86 4856.06 3974.79 -1763.52 5983815.36 719737.53 GYD-GC-MS 7400.00 64.81 333.56 4926.57 4866.77 3995.02 -1773.57 5983835.29 719726.90 GYD-GC-MS 7425.00 65.45 333.66 4937.09 4877.29 4015.34 -1783.65 5983855.30 719716.22 GYD-GC-MS • Halliburton Com an P Y Survey Report Company: BP Amaco Date: 5/9/2006 Time: 16:19:50 Page: b ~ Field: Niakuk Co-ordinatc(NE) Reference: Well: NK-14, True North 'i Sitc: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Well: NK- 14 Section (VS) Reference: WeII (O.OON,O.OOE,331.65Azi) ~ Wellpath: NK- 14A Survey Calculation IVletMod: Minimum Cu rvature llb: Oracle Survey MD Incl Aim TVD Sys TVD N/S E/W MapN NIapE Tool ft deg deg ft ft ft ft ft ft 7450.00 64.95 333.74 4947.57 4887.77 4035.68 -1793.70 5983875.34 719705.57 GYD-GC-MS 7475.00 64.96 333.56 4958.16 4898.36 4055.98 -1803.76 5983895.33 719694.92 GYD-GC-MS 7500.00 64.38 333.53 4968.85 4909.05 4076.21 -1813.82 5983915.25 719684.26 GYD-GC-MS 7525.00 64.62 333.40 4979.61 4919.81 4096.40 -1823.90 5983935.13 719673.59 GYD-GC-MS 7550.00 64.95 333.52 4990.27 4930.47 4116.63 -1834.01 5983955.06 719662.89 GYD-GC-MS 7575.00 65.04 333.52 5000.83 4941.03 4136.91 -1844.11 5983975.03 719652.19 GYD-GC-MS 7600.00 65.46 333.49 5011.30 4951.50 4157.23 -1854.24 5983995.04 719641.46 GYD-GC-MS 7625.00 65.39 333.41 5021.70 4961.90 4177.57 -1864.40 5984015.06 719630.71 GYD-GC-MS 7650.00 65.59 333.38 5032.07 4972.27 4197.91 -1874.59 5984035.09 719619.92 GYD-GC-MS 7675.00 65.59 333.36 5042.40 4982.60 4218.26 -1884.79 5984055.13 719609.12 GYD-GC-MS 7700.00 65.25 333.32 5052.80 4993.00 4238.57 -1895.00 5984075.14 719598.32 GYD-GC-MS 7725.00 65.13 333.44 5063.29 5003.49 4258.86 -1905.16 5984095.11 719587.56 GYD-GC-MS 7750.00 64.99 333.43 5073,83 5014.03 4279.14 -1915.30 5984115.08 719576.83 GYD-GC-MS 7775.00 65.10 333.46 5084.38 5024.58 4299.41 -1925.43 5984135.04 719566.10 GYD-GC-MS 7800.00 64.87 333.54 5094.95 5035.15 4319.69 -1935.54 5984155.01 719555.40 GYD-GC-MS 7825.00 64.45 333.56 5105.65 5045.85 4339.91 -1945.61 5984174.93 719544.74 GYD-GC-MS 7850.00 64.55 333.77 5116.41 5056.61 4360.14 -1955.62 5984194.85 719534.14 GYD-GC-MS 7875.00 64.42 333.78 5127.18 5067.38 4380.38 -1965.59 5984214.78 719523.57 GYD-GC-MS 7900.00 64.45 333.73 5137.97 5078.17 4400.60 -1975.56 5984234.71 719513.01 GYD-GC-MS 7925.00 64.71 333.97 5148.70 5088.90 4420.87 -1985.51 5984254.67 719502.46 GYD-GC-MS 7950.00 64.81 334.12 5159.36 5099.56 4441.21 -1995.41 5984274.70 719491.97 GYD-GC-MS 7975.00 65.09 334.03 5169.95 5110.15 4461.57 -2005.31 5984294.77 719481.47 GYD-GC-MS 8000.00 64.75 334.07 5180.54 5120.74 4481.93 -2015.22 5984314.83 719470.96 GYD-GC-MS 8025.00 64.74 334.18 5191.21 5131.41 4502.28 -2025.09 5984334.87 719460.50 GYD-GC-MS 8050.00 64.82 334.18 5201.86 5142.06 4522.64 -2034.94 5984354.93 719450.05 GYD-GC-MS 8075.00 64.50 334.30 5212.56 5152.76 4542.99 -2044.76 5984374.97 719439.63 GYD-GC-MS 8100.00 64.48 334.41 5223.33 5163.53 4563.33 -2054.52 5984395.02 719429.27 GYD-GC-MS 8125.00 64.49 334.44 5234.10 5174.30 4583.68 -2064.26 5984415.07 719418.94 GYD-GC-MS 8150.00 64.72 334.35 5244.82 5185.02 4604.04 -2074.02 5984435.14 719408.58 GYD-GC-MS 8175.00 64.54 334.34 5255.53 5195.73 4624.41 -2083.80 5984455.20 719398.20 GYD-GC-MS 8200.00 64.63 334.24 5266.26 5206.46 4644.75 -2093.60 5984475.25 719387.81 GYD-GC-MS 8225.00 64.79 334.41 5276.94 .5217.14 4665.12 -2103.39 5984495.32 719377.42 GYD-GC-MS 8250.00 64.56 334.30 5287.63 5227.83 4685.49 -2113.17 5984515.39 719367.04 GYD-GC-MS 8275.00 64,46 334.56 5298.39 5238.59 4705.85 -2122.91 5984535.45 719356.70 GYD-GC-MS 8300.00 64.56 334.67 5309.15 5249.35 4726.24 -2132.58 5984555.54 719346.43 GYD-GC-MS 8325.00 64.46 334.76 5319.91 5260.11 4746.64 -2142.22 5984575.65 719336.19 GYD-GC-MS 8350.00 64.45 334.72 5330.69 5270.89 4767.04 -2151.85 5984595.76 719325.97 GYD-GC-MS 8375.00 64.32 334.66 5341.50 5281.70 4787.42 -2161.49 5984615.84 719315.73 GYD-GC-MS 8400.00 64.61 334.57 5352.27 5292.47 4807.80 -2171.16 5984635.93 719305.46 GYD-GC-MS 8425.00 64.69 334.63 5362.98 5303.18 4828.21 -2180.85 5984656.04 719295.18 GYD-GC-MS 8450.00 65.21 334.70 5373.56 5313.76 4848.68 -2190.54 5984676.21 719284.88 GYD-GC-MS 8475.00 65.73 334.89 5383.94 5324.14 4869:26 -2200.22 5984696.49 719274.59 GYD-GC-MS 8500.00 65.63 334.75 5394.24 5334.44 4889.88 -2209.92 5984716.81 719264.30 GYD-GC-MS 8525.00 65.37 334.64 5404.61 5344.81 4910.44 -2219.64 5984737.08 719253.97 GYD-GC-MS 8550.00 65.26 334.78 5415.05 5355.25 4930.98 -2229.34 5984757.32 719243.66 GYD-GC-MS 8575.00 65.62 334.76 5425.44 5365.64 4951.55 -2239.04 5984777.60 719233.37 GYD-GC-MS 8600.00 66.08 334.72 5435.67 5375.87 4972.18 -2248.77 5984797.93 719223.03 GYD-GC-MS 8625.00 66.67 334.75 5445.68 5385.88 4992.89 -2258.55 5984818.34 719212.64 GYD-GC-MS 8650.00 66.65 334.78 5455.59 5395.79 5013.66 -2268.33 5984838.81 719202.25 GYD-GC-MS 8675.00 67.15 335.07 5465.40 5405.60 5034.48 -2278.08 5984859.34 719191.89 GYD-GC-MS 8700.00 67.42 335.15 5475.05 5415.25 5055.40 -2287.78 5984879.96 719181.57 GYD-GC-MS 8725.00 68.06 335.06 5484.52 5424.72 5076.39 -2297.52 5984900.65 719171.22 GYD-GC-MS Halliburton Com an P Y Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:19:50 Page: 7 Field: Nia kuk Co-ordinate(N E) Reference: Well; NK-14, True North Site: NK Main Pad Vertical ('I1'D ) Reference: 10:14 10/16/1993 10:09 59.8 ': Well: NK -14 Section (VS) R eference: Well (O.OON,O.OOE,331.65Azi) Welipath: NK -14A Survev Calculation Method: Minimum Cu rvature Db: Oracle 'I Survev MD Incl Azim TVD Sys TVD N/S E/W M17ap1 MapE "Ibol ft --- deg deg ft ft ft ft ft ft 8750.00 67.84 335.03 5493.91 5434.11 5097 40 -2307.30 5984921.36 719160.82 GYD-GC-MS 8775.00 67.91 335.06 5503.32 5443.52 5118.40 -2317.07 5984942.06 719150.44 GYD-GC-MS 8800.00 67.64 335.14 5512.78 5452.98 5139.39 -2326.81 5984962.75 719140.08 GYD-GC-MS 8825.00 67.71 335.15 5522.27 5462.47 5160.37 -2336.53 5984983.43 719129.74 GYD-GC-MS 8850.00 67.74 335.11 5531.75 5471.95 5181.36 -2346.26 5985004.13 719119.39 GYD-GC-MS 8875.00 68.09 335.20 5541.15 5481.35 5202.38 -2356.00 5985024.85 719109.04 GYD-GC-MS 8900.00 68.30 335.31 5550.44 5490.64 5223.46 -2365.71 5985045.63 719098.71 GYD-GC-MS 8925.00 68.26 335.36 5559.69 5499.89 5244.57 -2375.41 5985066.44 719088.40 GYD-GC-MS 8950.00 68.61 335.40 5568.88 5509.08 5265.70 -2385.09 5985087.28 719078.09 GYD-GC-MS 8975.00 68.86 335.40 5577.94 5518.14 5286.89 -2394.79 5985108.17 719067.77 GYD-GC-MS 9000.00 68.95 335.52 5586.94 5527.14 5308.11 -2404.48 5985129.09 719057.46 GYD-GC-MS 9025.00 69.09 335.42 5595.89 5536.09 5329.34 -2414.17 5985150.03 719047.15 GYD-GC-MS 9050.00 69.35 335.41 5604.76 5544.96 5350.60 -2423.89 5985170.98 719036.80 GYD-GC-MS 9075.00 69.08 335.49 5613.63 5553.83 5371.86 -2433.60 5985191.95 719026.46 GYD-GC-MS 9100.00 69.22 335.64 5622.53 5562.73 5393.13 -2443.27 5985212.92 719016.18 GYD-GC-MS 9125.00 69.37 335.60 5631.37 5571.57 5414.43 -2452.92 5985233.93 719005.90 GYD-GC-MS 9150.00 69.04 335.61 5640.25 5580.45 5435.71 -2462.57 5985254.92 718995.62 GYD-GC-MS 9175.00 69.36 335.82 5649.12 5589.32 5457.01 -2472.19 5985275.92 718985.38 GYD-GC-MS 9200.00 69.09 335.68 5657.99 5598.19 5478.33 -2481.79 5985296.94 718975.16 GYD-GC-MS 9225.00 69.33 335.64 5666.87 5607.07 5499.62 -2491.42 5985317.94 718964.90 GYD-GC-MS 9250.00 69.30 335.51 5675.70 5615.90 5520.92 -2501.09 5985338.94 718954.60 GYD-GC-MS 9275.00 69.32 335.41 5684.53 5624.73 5542.19 -2510.80 5985359.92 718944.26 GYD-GC-MS 9300.00 69.57 335.41 5693.31 5633.51 5563.48 -2520.54 5985380.90 718933.90 GYD-GC-MS 9325.00 69.51 335.31 5702.05 5642.25 5584.77 -2530.31 5985401.90 718923.51 GYD-GC-MS 9350.00 69.69 335.31 5710.76 5650.96 5606.06 -2540.10 5985422.89 718913.10 GYD-GC-MS 9375.00 69.57 335.34 5719.46 5659.66 5627.35 -2549.88 5985443.88 718902.69 GYD-GC-MS 9400.00 69.51 335.41 5728.20 5668.40 5648.65 -2559.64 5985464.88 718892.30 GYD-GC-MS 9425.00 69.55 335.40 5736.94 5677.14 5669.94 -2569.39 5985485.87 718881.93 GYD-GC-MS 9450.00 69.60 335.39 5745.67 5685.87 5691.24 -2579.14 5985506.88 718871.55 GYD-GC-MS 9475.00 69.26 335.34 5754.45 5694.65 5712.52 -2588.90 5985527.85 718861.17 GYD-GC-MS 9500.00 69.36 335.28 5763.28 5703.48 5733.77 -2598.67 5985548.80 718850.78 GYD-GC-MS 9525.00 69.30 335.33 5772.11 5712.31 5755.02 -2608.44 5985569.76 718840.38 GYD-GC-MS 9550.00 69.30 335.35 5780.95 5721.15 5776.27 -2618.20 5985590.71 718830.00 GYD-GC-MS 9575.00 69.17 335.38 5789.81 5730.01 5797.52 -2627.94 5985611.66 718819.63 GYD-GC-MS 9600.00 68.80 335.45 5798.77 5738.97 5818.74 -2637.65 5985632.59 718809.30 GYD-GC-MS 9625.00 68.76 335.33 5807.82 5748.02 5839.93 -2647.36 5985653.48 718798.97 GYD-GC-MS 9650.00 68.17 335.43 5817.00 5757.20 5861.07 -2657.05 5985674.32 718788.66 GYD-GC-MS 9675.00 68.84 335.44 5826.16 5766.36 5882.23 -2666.72 5985695.18 718778.37 GYD-GC-MS 9700.00 68.47 335.40 5835.26 5775.46 5903.40 -2676.40 5985716.06 718768.07 GYD-GC-MS 9725.00 68.59 335.40 5844.41 5784.61 5924.56 -2686.09 5985736.92 718757.76 GYD-GC-MS 9750.00 68.30 335.40 5853.60 5793.80 5945.70 -2695.77 5985757.76 718747.46 GYD-GC-MS 9775.00 68.05 335.53 5862.89 5803.09 5966.81 -2705.40 5985778.58 718737.20 GYD-GC-MS 9800.00 68.36 335.57 5872.17 5812.37 5987.94 -2715.01 5985799.41 718726.98 GYD-GC-MS 9825.00 67.92 335.70 5881.48 5821.68 6009.08 -2724.58 5985820.26 718716.78 GYD-GC-MS 9850.00 68.12 335.75 5890.84 5831.04 6030.21 -2734.11 5985841.10 718706.63 GYD-GC-MS 9875.00 67.93 335.65 5900.19 5840.39 6051.34 -2743.65 5985861.94 718696.47 GYD-GC-MS 9900.00 68.06 335.76 5909.56 5849.76 6072.47 -2753.19 5985882.77 718686.31 GYD-GC-MS 9925.00 68.14 335.55 5918.88 5859.08 6093.60 -2762.75 5985903.61 718676.13 GYD-GC-MS 9950.00 67.78 335.65 5928.27 5868.47 6114.70 -2772.33 5985924.42 718665.94 GYD-GC-MS 9975.00 67.86 335.63 5937.70 5877.90 6135.79 -2781.87 5985945.22 718655.77 GYD-GC-MS 10000.00 67.87 335.54 5947.12 5887.32 6156.88 -2791.45 5985966.01 718645.58 GYD-GC-MS 10025.00 67.56 335.39 5956.60 5896.80 6177.92 -2801.05 5985986.76 718635.36 GYD-GC-MS 10050.00 67.98 335.72 5966.06 5906.26 6198.99 -2810.63 5986007.53 718625.16 GYD-GC-MS Halliburton Com an p Y Survey Report Company: BP Amoco Field: Niakuk Site: NK Main Pad Well: NK-14 ~'1'ellpath: NK-14A Survey Date: 5/9/2006 Time: 16:19:50 Page: S Co-ordinate(NE) Reference: Well: NK-14, True North Vertical (T'VD) Reference: 10:14 10/16/1993 10:09 59.8 Section (VS) Reference: Well (O.OON,O.OOE,331.65Azi) Survey Calculation htcthod: Minimum Curvature Db: Orade MD __ Incl _ _ Azim _-- TVD Sys"fVD N1S __ EiW - _ - MapN - MapE Tool 1 ft deg deg ft ft ft ft ft ft I 10075.00 67.70 335.77 5975.49 5915.69 6220.10 -2820.14 5986028.35 718615.03 GYD-GC-MS 10100.00 67.60 335.30 5985.00 5925.20 6241.14 -2829.72 5986049.10 718604.84 GYD-GC-MS 10125.00 67.37 336.19 5994.57 5934.77 6262.20 -2839.20 5986069.87 718594.73 GYD-GC-MS 10150.00 67.00 336.13 6004.27 5944.47 6283.28 -2848.52 5986090.66 718584.80 GYD-GC-MS 10175.00 67.42 335.93 6013.95 5954.15 6304.34 -2857.88 5986111.44 718574.82 GYD-GC-MS 10200.00 67.21 335.96 6023.59 5963.79 6325.40 -2867.28 5986132.21 718564.80 GYD-GC-MS 10225.00 67.15 335.89 6033.29 5973.49 6346.44 -2876.68 5986152.96 718554.78 GYD-GC-MS 10250.00 66.97 336.00 6043.03 5983.23 6367.46 -2886.07 5986173.70 718544.78 GYD-GC-MS 10275.00 67.00 336.27 6052.81 5993.01 6388.51 -2895.38 5986194.45 718534.85 GYD-GC-MS 10300.00 67.11 336.00 6062.55 6002.75 6409.56 -2904.69 5986215.22 718524.92 GYD-GC-MS 10325.00 67.20 336.14 6072.26 6012.46 6430.62 -2914.04 5986235.99 718514.96 GYD-GC-MS 10350.00 67.05 336.22 6081.98 6022.18 6451.69 -2923.34 5986256.78 718505.04 GYD-GC-MS 10375.00 67.14 336.21 6091.71 6031.91 6472.76 -2932.63 5986277.57 718495.13 GYD-GC-MS 10400.00 67.16 336.10 6101.41 6041.61 6493.83 -2941.94 5986298.35 718485.20 GYD-GC-MS 10425.00 67.08 336.26 6111.13 6051.33 6514.91 -2951.24 5986319.14 718475.28 GYD-GC-MS 10450.00 67.41 336.29 6120.80 6061.00 6536.01 -2960.52 5986339.96 718465.38 GYD-GC-MS 10475.00 67.40 336.31 6130.41 6070.61 6557.15 -2969.80 5986360.81 718455.48 GYD-GC-MS 10500.00 67.86 336.39 6139.92 6080.12 6578.32 -2979.07 5986381.70 718445.59 GYD-GC-MS 10525.00 67.71 336.31 6149.38 6089.58 6599.52 -2988.35 5986402.62 718435.68 GYD-GC-MS 10550.00 67.71 336.49 6158.86 6099.06 6620.72 -2997.61 5986423.53 718425.80 GYD-GC-MS 10575.00 67.59 336.56 6168.36 6108.56 6641.93 -3006.82 5986444.46 718415.96 GYD-GC-MS 10600.00 67.83 336.50 6177.85 6118.05 6663.15 -3016.04 5986465.39 718406.13 GYD-GC-MS 10625.00 67.91 336.89 6187.26 6127.46 6684.42 -3025.20 5986486.38 718396.34 GYD-GC-MS 10650.00 67.62 336.96 6196.73 6136.93 6705.70 -3034.27 5986507.39 718386.65 GYD-GC-MS 10675.00 67.74 336.72 6206.22 6146.42 6726.97 -3043.37 5986528.38 718376.93 GYD-GC-MS 10700.00 66.99 337.20 6215.84 6156.04 6748.20 -3052.40 5986549.33 718367.27 GYD-GC-MS 10725.00 66.70 337.56 6225.67 6165.87 6769.42 -3061.24 5986570.28 718357.81 GYD-GC-MS 10750.00 67.12 337.87 6235.48 6175.68 6790.70 -3069.96 5986591.29 718348.46 GYD-GC-MS 10775.00 65.76 338.82 6245.47 6185.67 6812.00 -3078.41 5986612.33 718339.38 GYD-GC-MS 10800.00 64.69 340.06 6255.95 6196.15 6833.25 -3086.39 5986633.33 718330.78 GYD-GC-MS 10825.00 64.99 339.84 6266.57 6206.77 6854.50 -3094.14 5986654.35 718322.40 GYD-GC-MS 10850.00 64.63 339.40 6277.21 6217.41 6875.71 -3102.02 5986675.31 718313.90 GYD-GC-MS 10875.00 63.63 340.43 6288.12 6228.32 6896.84 -3109.75 5986696.20 718305.55 GYD-GC-MS 10900.00 63.53 340.94 6299.25 6239.45 6917.97 -3117.15 5986717.10 718297.53 GYD-GC-MS 10925.00 63.89 341.04 6310.32 6250.52 6939.16 -3124.45 5986738.07 718289.60 GYD-GC-MS 10950.00 64.12 341.27 6321.28 6261.48 6960.42 -3131.71 5986759.11 718281.72 GYD-GC-MS 10975.00 64.21 340.91 6332.17 6272.37 6981.71 -3139.01 5986780.17 718273.80 GYD-GC-MS 11000.00 64.04 342.34 6343.08 6283.28 7003.06 -3146.10 5986801.29 718266.08 GYD-GC-MS 11025.00 64.07 342.13 6354.02 6294.22 7024.46 -3152.95 5986822.49 718258.59 GYD-GC-MS 11050.00 64.54 342.49 6364.86 6305.06 7045.93 -3159.80 5986843.74 718251.12 GYD-GC-MS 11075.00 64.25 342.93 6375.66 6315.86 7067.45 -3166.50 5986865.06 718243.78 GYD-GC-MS 11100.00 64.32 343.42 6386.51 6326.71 7089.01 -3173.02 5986886.41 718236.63 GYD-GC-MS 11125.00 64.48 343.26 6397.31 6337.51 7110.61 -3179.48 5986907.81 718229.53 GYD-GC-MS 11150.00 64.99 343.79 6407.98 6348.18 7132.29 -3185.90 5986929.29 718222.48 GYD-GC-MS 11175.00 65.28 344.01 6418.50 6358.70 7154.09 -3192.19 5986950.89 718215.55 GYD-GC-MS 11200.00 65.44 343.29 6428.92 6369.12 7175.89 -3198.58 5986972.49 718208.51 GYD-GC-MS 11225.00 65.84 342.92 6439.23 6379.43 7197.68 -3205.20 5986994.08 718201.25 GYD-GC-MS 11250.00 66.32 342.50 6449.37 6389.57 7219.50 -3211.99 5987015.69 718193.82 GYD-GC-MS 11275.00 66.66 341.92 6459.34 6399.54 7241.33 -3219.00 5987037.30 718186.17 GYD-GC-MS 11300.00 66.80 341.23 6469.22 6409.42 7263.12 -3226.26 5987058.86 718178.27 GYD-GC-MS 11325.00 67.21 340.44 6478.98 6419.18 7284.86 -3233.81 5987080.36 718170.08 GYD-GC-MS 11350.00 67.41 339.75 6488.63 6428.83 7306.54 -3241.66 5987101.81 718161.59 GYD-GC-MS .. i Halhburton Company Survey Report Company: BP Amoco Date: 5/9(2006 Time: 16:19:50 Page: 9 Field: Nia kuk Caordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVll ) Reference: 10:14 10/16/1993 10.09 59.8 Well: NK -14 Section (VS) Reference: Well (O.OON,O,OOE,331.65Azi) ~ WelJpath: NK-14A Survey Calcu lation Method: Minimum Cu rvature llb: Oracle Survey _ - - IV1D Incl Azim 'fVD Sys TVD lY/S E/W h1apN - 111apE - - - 'fool ft deg deg ft ft ft ft ft ft 11375.00 67.55 339.20 6498.20 6438.40 7328.17 -3249.76 5987123.19 718152.85 GYD-GC-MS 11400.00 67.76 339.18 6507.71 6447.91 7349.78 -3257.98 5987144.55 718144.00 GYD-GC-MS 11425.00 67.94 339.11 6517.13 6457.33 7371.42 -3266.22 5987165.93 718135.12 GYD-GC-MS 11450.00 68.38 339.27. 6526.43 6466.63 7393.11 -3274.46 5987187.37 718126.24 GYD-GC-MS 11475.00 68.23 338.43 6535.67 6475.87 7414.78 -3282.85 5987208.77 718117.22 GYD-GC-MS 11500.00 68.57 337.78 6544.88 6485.08 7436.35 -3291.51 5987230.08 718107.92 GYD-GC-MS 11525.00 68.65 337.34 6553.99 6494.19 7457.86 -3300.40 5987251.32 718098.41 GYD-GC-MS 11550.00 68.66 337.12 6563.09 6503.29 7479.33 -3309.41 5987272.51 718088.76 GYD-GC-MS 11575.00 68.84 336.32 6572.16 6512.36 7500.73 -3318.62 5987293.63 718078.93 GYD-GC-MS 11600.00 68.88 335.84 6581.17 6521.37 7522.05 -3328.07 5987314.66 718068.85 GYD-GC-MS 11625.00 68.92 335.69 6590.17 6530.37 7543.32 -3337.65 5987335.63 718058.65 GYD-GC-MS 11650.00 69.23 335.62 6599.10 6539.30 7564.59 -3347.27 5987356.61 718048.40 GYD-GC-MS 11675.00 69.30 335.68 6607.95 6548.15 7585.89 -3356.91 5987377.62 718038.13 GYD-GC-MS 11700.00 69.41 335.24 6616.77 6556.97 7607.17 -3366.63 5987398.60 718027.79 GYD-GC-MS 11725.00 69.60 335.27 6625.52 6565.72 7628.44 -3376.43 5987419.57 718017.36 GYD-GC-MS 11750.00 69.29 336.09 6634.30 6574.50 7649.77 -3386.07 5987440.60 718007.10 GYD-GC-MS 11775.00 68.66 335.13 6643.27 6583.47 7671.03 -3395.71 5987461.56 717996.84 GYD-GC-MS 11800.00 69.10 335.29 6652.27 6592.47 7692.20 -3405.49 5987482.43 717986.44 GYD-GC-MS 11825.00 69.13 335.58 6661.19 6601.39 7713.44 -3415.20 5987503.38 717976.10 GYD-GC-MS 11850.00 68.83 335.14 6670.15 6610.35 7734.65 -3424.93 5987524.29 717965.75 GYD-GC-MS 11875.00 68.67 335.13 6679.22 6619.42 7755.79 -3434.72 5987545.13 717955.34 GYD-GC-MS 11900.00 69.15 334.52 6688.21 6628.41 7776.90 -3444.65 5987565.94 717944.79 GYD-GC-MS 11925.00 68.72 335.92 6697.20 .6637.40 7798.08 -3454.42 5987586.82 717934.39 GYD-GC-MS 11950.00 68.24 335.21 6706.37 6646.57 7819.26 -3464.04 5987607.70 717924.15 GYD-GC-MS 11975.00 68.21 335.04 6715.64 6655.84 7840.32 -3473.81 5987628.46 717913.77 GYD-GC-MS 12000.00 68.15 335.18 6724.93 6665.13 7861.37 -3483.58 5987649.22 717903.38 GYD-GC-MS 12025.00 68.19 335.40 6734.23 6674.43 7882.45 -3493.28 5987670.00 717893.06 GYD-GC-MS 12050.00 67.84 335.16 6743.59 6683.79 7903.51 -3502.97 5987690.76 717882.75 GYD-GC-MS 12075.00 67.74 334.64 6753.04 6693.24 7924.47 -3512.79 5987711.42 717872.32 GYD-GC-MS 12100.00 67.94 334.76 6762.47 6702.67 7945.40 -3522.69 5987732.05 717861.81 GYD-GC-MS 12125.00 67.75 335.28 6771.90 6712.10 7966.39 -3532.46 5987752.74 717851.41 GYD-GC-MS 12150.00 67.72 334.67 6781.37 6721.57 7987.36 -3542.25 5987773.41 717841.01 GYD-GC-MS 12175.00 67.38 334.34 6790.92 6731.12 8008.21 -3552.20 5987793.96 717830.46 GYD-GC-MS 12200.00 67.44 334.77 6800.52 6740.72 8029.05 -3562.11 5987814.50 717819.93 GYD-GC-MS 12225.00 67.38 334.34 6810.12 6750.32 8049.90 -3572.03 5987835.04 717809.40 GYD-GC-MS 12250.00 67.28 334.08 6819.76 6759.96 8070.67 -3582.07 5987855.50 717798.75 GYD-GC-MS 12275.00 67.28 332.99 6829.41 6769.61 8091.31 -3592.34 5987875.83 717787.87 GYD-GC-MS 12300.00 67.46 334.40 6839.03 6779.23 8112.00 -3602.57 5987896.20 717777.04 GYD-GC-MS 12325.00 67.39 334.15 6848.63 6788.83 8132.79 -3612.59 5987916.69 717766.41 GYD-GC-MS 12350.00 67.61 334.21 6858.20 6798.40 8153.58 -3622.65 5987937.18 717755.74 GYD-GC-MS 12375.00 67.55 334.03 6867.73 6807.93 8174.38 -3632.74 5987957.66 717745.04 GYD-GC-MS 12400.00 67.46 334.38 6877.30 6817.50 8195.17 -3642.79 5987978.15 717734.38 GYD-GC-MS 12425.00 67.64 334.19 6886.85 6827.05 8215.99 -3652.81 5987998.66 717723.74 GYD-GC-MS 12450.00 67.28 333.90 6896.43 6836.63 8236.75 -3662.92 5988019.11 717713.03 GYD-GC-MS 12475.00 67.35 334.20 6906.07 6846.27 8257.49 -3673.01 5988039.54 717702.33 GYD-GC-MS 12500.00 67.18 334.01 6915.73 6855.93 8278.23 -3683.08 5988059.98 717691.65 GYD-GC-MS 12525.00 67.59 333.40 6925.35 6865.55 .8298.92 -3693.30 5988080.36 717680.82 GYD-GC-MS 12550.00 66.84 334.71 6935.03 6875.23 8319.65 -3703.39 5988100.77 717670.13 GYD-GC-MS 12575.00 66.58 333.58 6944.91 6885.11 8340.31 -3713.40 5988121.13 717659.51 GYD-GC-MS 12600.00 66.79 334.13 6954.81 6895.01 8360.92 -3723.52 5988141.43 717648.79 GYD-GC-MS 12625.00 66.71 334.23 6964.68 6904.88 8381.60 -3733.52 5988161.80 717638.18 GYD-GC-MS 12650.00 66.31 333.57 6974.64 6914.84 8402.19 -3743.61 5988182.08 717627.48 GYD-GC-MS 12675.00 66.24 333.90 6984.70 6924.90 8422.71 -3753.74 5988202.30 717616.75 GYD-GC-MS `~ • Halliburton Com an • P Y Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:19:50 Page: 10 Field: Nia kuk Co-ordinate(NE) Keference: Well: NK-14, True North ' Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Nell: NK -14 Section (VS) Reference: Well (O.OON,O.OOE,331.65Azi) Wcllpath: NK-14A -- _ _ __ _ Survey Calcu - _ lation Method: - Minimum Cu - _ -- rvature Db: Orade _ __ J Sorcc~ MD Intl Azim TVD Sys TVD 1/S E/W MapM1 MapE Tool ft -- deg deg ft ft ft ft ft ft 12700.00 66.30 334.04 6994.76 6934.96 8443.28 -3763.78 5988222.56 717606.11 GYD-GC-MS 12725.00 66.13 333.60 7004.84 6945.04 8463.81 -3773.87 5988242.78 717595.41 GYD-GC-MS 12750.00 66.17 333.86 7014.95 6955.15 8484.31 -3783.99 5988262.97 717584.69 GYD-GC-MS 12775.00 65.82 334.09 7025.12 6965.32 8504.83 -3794.02 5988283.19 717574.07 GYD-GC-MS 12800.00 66.13 334.00 7035.30 6975.50 8525.36 -3804.01 5988303.41 717563.47 GYD-GC-MS 12825.00 65.82 334.23 7045.48 6985.68 8545.91 -3813.98 5988323.65 717552.90 GYD-GC-MS 12850.00 65.87 333.92 7055.71 6995.91 8566.42 -3823.95 5988343.86 717542.33 GYD-GC-MS 12875.00 66.03 333.90 7065.90 7006.10 8586.93 -3833.99 5988364.06 717531.68 GYD-GC-MS 12900.00 65.83 334.37 7076.09 7016.29 8607.47 -3843.95 5988384.30 717521.12 GYD-GC-MS 12925.00 66.01 333.97 7086.29 7026.49 8628.01 -3853.89 5988404.54 717510.58 GYD-GC-MS 12950.00 65.85 334.17 7096.49 7036.69 8648.54 -3863.87 5988424.76 717499.99 GYD-GC-MS 12975.00 65.09 335.00 7106.87 7047.07 8669.08 -3873.64 5988445.00 717489.63 GYD-GC-MS 13000.00 65.42 334.34 7117.33 7057.53 8689.60 -3883.35 5988465.23 717479.31 GYD-GC-MS 13025.00 65.38 334.47 7127.74 7067.94 8710.10 -3893.17 5988485.43 717468.89 GYD-GC-MS 13050.00 65.68 334.52 7138.10 7078.30 8730.64 -3902.97 5988505.66 717458.49 GYD-GC-MS 13075.00 65.86 334.50 7148.36 7088.56 8751.22 -3912.78 5988525.94 717448.08 GYD-GC-MS 13100.00 66.17 334.52 7158.52 7098.72 8771.83 -3922.61 5988546.26 717437.64 GYD-GC-MS 13125.00 66.29 334.46 7168.60 7108.80 8792.48 -3932.46 5988566.61 717427.18 GYD-GC-MS 13150.00 66.37 334.50 7178.63 7118.83 8813.15 -3942.33 5988586.97 717416.71 GYD-GC-MS 13175.00 66.69 334.33 7188.59 7128.79 8833.83 -3952.23 5988607.35 717406.20 GYD-GC-MS 13200.00 66.79 334.45 7198.46 7138.66 8854.54 -3962.16 5988627.76 717395.67 GYD-GC-MS 13225.00 67.04 334.50 7208.26 7148.46 8875.29 -3972.07 5988648.21 717385.15 GYD-GC-MS 13250.00 67.21 334.58 7217.98 7158.18 8896.09 -3981.97 5988668.70 717374.64 GYD-GC-MS 13275.00 67.32 334.63 7227.64 7167.84 8916.92 -3991.86 5988689.23 717364.14 GYD-GC-MS 13300.00 67.71 334.55 7237.21 7177.41 8937.79 -4001.77 5988709.79 717353.61 GYD-GC-MS 13325.00 67.90 334.55 7246.65 7186.85 8958.69 -4011.72 5988730.39 717343.05 GYD-GC-MS 13350.00 68.46 334.18 7255.94 7196.14 8979.61 -4021.76 5988751.00 717332.40 GYD-GC-MS 13375.00 68.01 335.10 7265.21 7205.41 9000.59 -4031.70 5988771.68 717321.84 GYD-GC-MS 13400.00 67.24 335.34 7274.73 7214.93 9021.58 -4041.39 5988792.37 717311.53 GYD-GC-MS 13425.00 68.11 335.62 7284.22 7224.42 9042.62 -4050.99 5988813.12 717301.32 GYD-GC-MS 13450.00 68.21 335.07 7293.53 7233.73 9063.71 -4060.67 5988833.91 717291.02 GYD-GC-MS 13475.00 68.62 335.07 7302.72 7242.92 9084.79 -4070.47 5988854.69 717280.60 GYD-GC-MS 13500.00 68.19 336.09 7311.92 7252.12 9105.96 -4080.08 5988875.56 717270.37 GYD-GC-MS 13525.00 68.06 336.42 7321.24 7261.44 9127.19 -4089.42 5988896.51 717260.40 GYD-GC-MS 13550.00 67.42 335.59 7330.71 7270.91 9148.33 -4098.83 5988917.36 717250.38 GYD-GC-MS 13575.00 67.55 336.15 7340.28 7280.48 9169.41 -4108.27 5988938.15 717240.32 GYD-GC-MS 13600.00 67.66 336.54 7349.81 7290.01 9190.58 -4117.54 5988959.04 717230.42 GYD-GC-MS 13625.00 67.76 336.01 7359.29 7299.49 9211.75 -4126.85 5988979.93 717220.49 GYD-GC-MS 13650.00 67.86 336.03 7368.73 7308.93 9232.91 -4136.26 5989000.79 717210.46 GYD-GC-MS 13675.00 68.41 336.44 7378.04 7318.24 9254.14 -4145.61 5989021.74 717200.49 GYD-GC-MS 13700.00 68.52 336.09 7387.22 7327.42 9275.43 -4154.97 5989042.74 717190.50 GYD-GC-MS 13725.00 68.69 336.01 7396.34 7336.54 9296.70 -4164.42 5989063.72 717180.43 GYD-GC-MS 13750.00 69.09 336.32 7405.34 7345.54 9318.03 -4173.84 5989084.77 717170.38 GYD-GC-MS 13775.00 69.05 335.48 7414.27 7354.47 9339.35 -4183.38 5989105.79 717160.22 GYD-GC-MS 13800.00 68.97 336.63 7423.23 7363.43 9360.68 -4192.85 5989126.83 717150.12 GYD-GC-MS 13825.00 68.58 336.32 7432.28 7372.48 9382.05 -4202.15 5989147.91 717140.19 GYD-GC-MS 13850.00 68.41 335.44 7441.44 7381.64 9403.28 -4211.66 5989168.85 717130.06 GYD-GC-MS 13875.00 68.25 336.48 7450.68 7390.88 9424.49 -4221.12 5989189.78 717119.98 GYD-GC-MS 13900.00 68.33 336.36 7459.92 7400.12 9445.78 -4230.41 5989210.78 717110.06 GYD-GC-MS 13925.00 68.18 335.81 7469.19 7409.39 9467.01 -4239.82 5989231.72 717100.02 GYD-GC-MS 13950.00 68.15 336.35 7478.48 7418.68 9488.22 -4249.23 5989252.64 717089.99 GYD-GC-MS 13975.00 68.01 336.49 7487.82 7428.02 9509.48 -4258.51 5989273.62 717080.09 GYD-GC-MS Halliburton Company Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:19:50 Yage: 11 l~icld: Niakuk Co-ordinate(NE) Rcfcrence: Well: NK-14, True North Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Well: NK- 14 Section (VS) Reference: Well (O.OON,O.OOE,331.65Azi) ~ ~Vellpath: NK-14A Survey Calculation I14ethod: Minimum Cu rvature Db: Oracle Su rs c~ MD -ncl 1zim TVD Sys TVD iV/S E/W M1lapN MapE Tool ft deg deg ft ft ft ft ft ft 14000.00 67.97 335 79 7497.19 7437.39 9530.67 -4267.89 5989294.53 717070.09 GYD-GC-MS 14025.00 67.67 336.24 7506.62 7446.82 9551.83 -4277.30 5989315.39 717060.06 GYD-GC-MS 14050.00 67.90 336.20 7516.08 7456.28 9573.00 -4286.63 5989336.28 717050.11 GYD-GC-MS 14075.00 67.72 335.82 7525.52 7465.72 9594.15 -4296.04 5989357.14 717040.07 GYD-GC-MS 14100.00 67.37 336.50 7535.07 7475.27 9615.29 -4305.38 5989377.99 717030.11 GYD-GC-MS 14125.00 67.60 336.07 7544.64 7484.84 9636.43 -4314.67 5989398.85 717020.21 GYD-GC-MS 14150.00 67.53 335.89 7554.18 7494.38 9657.54 -4324.07 5989419.67 717010.18 GYD-GC-MS 14175.00 67.21 336.71 7563.80 7504.00 9678.67 -4333.35 5989440.51 717000.28 GYD-GC-MS 14200.00 67.28 336.44 7573.47 7513.67 9699.82 -4342.51 5989461.38 716990.50 GYD-GC-MS 14225.00 67.46 335.72 7583.09 7523.29 9720.91 -4351.87 5989482.19 716980.52 GYD-GC-MS 14250.00 67.11 336.40 7592.74 7532.94 9741.99 -4361.23 5989502.98 716970.55 GYD-GC-MS 14275.00 66.96 336.54 7602.50 7542.70 9763.09 -4370.42 5989523.80 716960.74 GYD-GC-MS 14300.00 66.93 336.50 7612.29 7552.49 9784.19 -4379.58 5989544.62 716950.95 GYD-GC-MS 14325.00 66.87 336.51 7622.10 7562.30 9805.28 -4388.75 5989565.43 716941.17 GYD-GC-MS 14350.00 66.91 336.49 7631.91 7572.11 9826.37 -4397.92 5989586.23 716931.38 GYD-GC-MS 14375.00 66.96 336.47 7641.70 7581.90 9847.46 -4407.10 5989607.04 716921.58 GYD-GC-MS 14400.00 67.00 336.45 7651.48 7591.68 9868.55 -4416.29 5989627.85 716911.77 GYD-GC-MS 14425.00 67.04 336.43 7661.24 7601.44 9889.65 -4425.49 5989648.67 716901.95 GYD-GC-MS 14450.00 67.14 336.37 7670.97 7611.17 9910.75 -4434.71 5989669.49 716892.11 GYD-GC-MS 14475.00 67.23 336.30 7680.67 7620.87 9931.86 -4443.96 5989690.31 716882.24 GYD-GC-MS 14500.00 67.33 336.24 7690.32 7630.52 9952.97 -4453.24 5989711.14 716872.34 GYD-GC-MS 14525.00 67.42 336.17 7699.94 7640.14 9974.08 -4462.55 5989731.97 716862.41 GYD-GC-MS 14550.00 67.44 336.30 7709.53 7649.73 9995.21 -4471.85 5989752.81 716852.49 GYD-GC-MS 14575.00 67.46 336.43 7719.12 7659.32 10016.36 -4481.11 5989773.68 716842.61 GYD-GC-MS 14600.00 67.47 336.56 7728.70 7668.90 10037.54 -4490.32 5989794.57 716832.78 GYD-GC-MS 14625.00 67.49 336.69 7738.28 7678.48 10058.74 -4499.48 5989815.49 716823.00 GYD-GC-MS 14650.00 67.50 336.76 7747.85 7688.05 10079.95 -4508.61 5989836.42 716813.25 GYD-GC-MS 14675.00 67.51 336.84 7757.41 7697.61 10101.18 -4517.70 5989857.37 716803.52 GYD-GC-MS 14700.00 67.51 336.91 7766.98 7707.18 10122.43 -4526.78 5989878.34 716793.83 GYD-GC-MS 14725.00 67.52 336.98 7776.54 7716.74 10143.68 -4535.82 5989899.31 716784.16 GYD-GC-MS 14750.00 67.54 337.06 7786.09 7726.29 10164.95 -4544.84 5989920.31 716774.52 GYD-GC-MS 14775.00 67.56 337.15 7795.64 7735.84 10186.23 -4553.83 5989941.31 716764.90 GYD-GC-MS 14800.00 67.57 337.23 7805.18 7745.38 10207.54 -4562.79 5989962.34 716755.32 GYD-GC-MS 14825.00 67.59 337.31 7814.71 7754.91 10228.85 -4571.72 5989983.38 716745.76 GYD-GC-MS 14850.00 67.66 337.26 7824.23 7764.43 10250.18 -4580.65 5990004.43 716736.21 GYD-GC-MS 14875.00 67.73 337.21 7833.72 7773.92 10271.50 -4589.60 5990025.48 716726.63 GYD-GC-MS 14900.00 67.80 337.16 7843.18 7783.38 10292.83 -4598.57 5990046.54 716717.03 GYD-GC-MS 14925.00 67.87 337.11 7852.61 7792.81 10314.17 -4607.56 5990067.60 716707.41 GYD-GC-MS 14950.00 67.86 337.05 7862.03 7802.23 10335.50 -4616.58 5990088.65 716697.77 GYD-GC-MS 14975.00 67.85 336.99 7871.45 7811.65 10356.81 -4625.62 5990109.69 716688.10 GYD-GC-MS 15000.00 67.84 336.93 7880.88 7821.08 10378.12 -4634.69 5990130.72 716678.41 GYD-GC-MS 15025.00 67.83 336.87 7890.31 7830.51 10399.42 -4643.77 5990151.74 716668.70 GYD-GC-MS 15050.00 67.74 336.93 7899.77 7839.97 10420.71 -4652.85 5990172.75 716659.00 GYD-GC-MS 15075.00 67.65 337.00 7909.25 7849.45 10441.99 -4661.90 5990193.75 716649.32 GYD-GC-MS 15100.00 67.56 337.06 7918.78 7858.98 10463.27 -4670.92 5990214.76 716639.68 GYD-GC-MS 15125.00 67.47 337.12 7928.34 7868.54 10484.55 -4679.91 5990235.76 716630.06 GYD-GC-MS 15150.00 67.35 336.87 7937.94 7878.14 10505.80 -4688.93 5990256.73 716620.41 GYD-GC-MS 15175.00 67.24 336.62 7947.59 7887.79 10526.99 -4698.04 5990277.64 716610.69 GYD-GC-MS 15200.00 67.12 336.36 7957.29 7897.49 10548.12 -4707.23 5990298.49 716600.87 GYD-GC-MS 15225.00 67.00 336.11 7967.03 7907.23 10569.19 -4716.51 5990319.27 716590.98 GYD-GC-MS 15250.00 66.94 336.14 7976.81 7917.01 10590.23 -4725.82 5990340.03 716581.05 GYD-GC-MS 15275.00 66.88 336.17 7986.62 7926.82 10611.26 -4735.12 5990360.77 716571.13 GYD-GC-MS 15300.00 66.83 336.21 7996.45 7936.65 10632.29 -4744.40 5990381.52 716561.24 GYD-GC-MS • Halliburton Company Survey Report Company: BP Amoco Datc: 5!9/2 006 Ti me: 16:19:50 Page: 12 field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Well: NK- 14 Section (VS) Keference: Well (O.OON,O.OOE;331.65Azi) Wellpath: NK-14A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys "CVD \/S E/W N1apN 1V'[apE "1'001 ft deg deg ft ft ft ft ft ft j 15325.00 66.77 336.24 8006.29 7946.49 10653.32 -4753.66 5990402.27 716551.35 GYD-GC-MS 15350.00 66.76 336.04 8016.16 7956.36 10674.33 -4762.95 5990422.99 716541.45 GYD-GC-MS 15375.00 66.74 335.85 8026.02 7966.22 10695.30 -4772.32 5990443.68 716531.47 GYD-GC-MS 15400.00 66.72 335.66 8035.90 7976.10 10716.24 -4781.75 5990464.33 716521.42 GYD-GC-MS 15425.00 66.71 335.46 8045.78 7985.98 10737.15 -4791.25 5990484.94 716511.31 GYD-GC-MS 15450.00 66.69 335.36 8055.67 7995.87 10758.03 -4800.80 5990505.53 716501.14 GYD-GC-MS 15475.00 66.67 335.26 8065.57 8005.77 10778.89 -4810.39 5990526.10 716490.94 GYD-GC-MS 15500.00 66.65 335.15 8075.47 8015.67 10799.73 -4820.02 5990546.64 716480.70 GYD-GC-MS 15525.00 66.63 335.05 8085.39 8025.59 10820.54 -4829.68 5990567.16 716470.43 GYD-GC-MS 15550.00 66.66 335.18 8095.30 8035.50 10841.36 -4839.34 5990587.69 716460.16 GYD-GC-MS 15575.00 66.68 335.30 8105.20 8045.40 10862.21 -4848.95 5990608.24 716449.93 GYD-GC-MS 15600.00 66.71 335.43 8115.09 8055.29 10883.08 -4858.53 5990628.82 716439.75 GYD-GC-MS 15625.00 66.74 335.55 8124.97 8065.17 10903.98 -4868.05 5990649.42 716429.61 GYD-GC-MS 15650.00 66.76 335.45 8134.84 8075.04 10924.88 -4877.58 5990670.03 716419.47 GYD-GC-MS 15675.00 66.79 335.35 8144.69 8084.89 10945.77 -4887.14 5990690.63 716409.29 GYD-GC-MS 15700.00 66.82 335.25 8154.54 8094.74 10966.64 -4896.74 5990711.21 716399.08 GYD-GC-MS 15725.00 66.84 335.15 8164.38 8104.58 10987.51 -4906.38 5990731.78 716388.82 GYD-GC-MS 15750.00 66.93 335.30 8174.19 8114.39 11008.38 -4916.02 5990752.36 716378.58 GYD-GC-MS 15775.00 67.02 335.46 8183.97 8124.17 11029.30 -4925.61 5990772.98 716368.38 GYD-GC-MS 15800.00 67.11 335.61 8193.71 8133.91 11050.26 -4935.14 5990793.65 716358.23 GYD-GC-MS 15825.00 67.20 335.76 8203.42 8143.62 11071.25 -4944.63 5990814.35 716348.12 GYD-GC-MS 15850.00 66.97 335.45 8213.15 8153.35 11092.22 -4954.14 5990835.03 716338.00 GYD-GC-MS 15875.00 66.75 335.13 8222.98 8163.18 11113.11 -4963.75. 5990855.62 716327.78 GYD-GC-MS 15900.00 66.52 334.82 8232.89 8173.09 11133.90 -4973.46 5990876.12 716317.46 GYD-GC-MS 15925.00 66.29 334.50 8242.90 8183.10 11154.61 -4983.26 5990896.52 716307.04 GYD-GC-MS 15950.00 66.25 334.50 8252.96 8193.16 11175.27 -4993.11 5990916.88 716296.59 GYD-GC-MS 15975.00 66.22 334.51 8263.03 8203.23 11195.92 -5002.96 5990937.23 716286.13 GYD-GC-MS 16000.00 66.18 334.51 8273.12 8213.32 11216.57 -5012.81 5990957.58 716275.68 GYD-GC-MS 16025.00 66.14 334.51 8283.23 8223.43 11237.21 -5022.65 5990977.92 716265.23 GYD-GC-MS 16050.00 66.19 334.53 8293.33 8233.53 11257.85 -5032.48 5990998.26 716254.79 GYD-GC-MS 16075.00 66.24 334.55 8303.41 8243.61 11278.50 -5042.32 5991018.61 716244.35 GYD-GC-MS 16100.00 66.28 334.58 8313.48 8253.68 11299.17 -5052.15 5991038.98 716233.92 GYD-GC-MS 16125.00 66.33 334.60 8323.52 8263.72 11319.85 -5061.97 5991059.36 716223.49 GYD-GC-MS 16150.00 66.31 334.41 8333.56 8273.76 11340.51 -5071.82 5991079.72 716213.03 GYD-GC-MS 16175.00 66.29 334.23 8343.61 8283.81 11361.15 -5081.74 5991100.05 716202.50 GYD-GC-MS 16200.00 66.26 334.04 8353.67 8293.87 11381.74 -5091.73 5991120.34 716191.91 GYD-GC-MS 16225.00 66.24 333.85 8363.74 8303.94 11402.30 -5101.78 5991140.59 716181.26 GYD-GC-MS 16250.00 66.27 333.82 8373.81 8314.01 11422.84 -5111.87 5991160.82 716170.56 GYD-GC-MS 16275.00 66.31 333.78 8383.86 8324.06 11443.37 -5121.98 5991181.05 716159.86 GYD-GC-MS 16300.00 66.34 333.75 8393.90 8334.10 11463.91 -5132.10 5991201.28 716149.13 GYD-GC-MS 16325.00 66.37 333.71 8403.93 8344.13 11484.45 -5142.23 5991221.50 716138.39 GYD-GC-MS 16350.00 66.42 333.62 8413.94 8354.14 11504.98 -5152.40 5991241.72 716127.63 GYD-GC-MS 16375.00 66.47 333.53 8423.93 8364.13 11525.50 -5162.59 5991261.93 716116.83 GYD-GC-MS 16400.00 66.53 333.43 8433.90 8374.10 11546.01 -5172.83 5991282.14 716105.99 GYD-GC-MS 16425.00 66.58 333.34 8443.84 8384.04 11566.52 -5183.11 5991302.33 716095.11 GYD-GC-MS 16450.00 66.54 333.45 8453.79 8393.99 11587.03 -5193.38 5991322.52 716084.24 GYD-GC-MS 16475.00 66.51 333.57 8463.75 8403.95 11607.55 -5203.61 5991342.73 716073.41 GYD-GC-MS 16500.00 66.47 333.68 8473.72 8413.92 11628.09 -5213.79 5991362.96 716062.62 GYD-GC-MS 16525.00 66.43 333.79 8483.71 8423.91 11648.64 -5223.93 5991383.20 716051.88 GYD-GC-MS 16550.00 66.46 333.70 8493.70 8433.90 11669.19 -5234.07 5991403.45 716041.14 GYD-GC-MS 16575.00 66.49 333.62 8503.68 8443.88 11689.74 -5244.24 5991423.68 716030.37 GYD-GC-MS 16600.00 66.51 333.53 8513.65 8453.85 11710.27 -5254.44 5991443.90 716019.56 GYD-GC-MS • Halliburton Company Survey Report Company: BP Amoco Date: 5/9/2006 Time: 16:19:50 Page: 13 Field: Nia kuk Co-ordinate(\ E) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD ) Keference: 10:14 10!16/1993 10:09 59.8 Nell: NK -14 Section (VS) Reference: Well (O.OON,O.OOE,331.65Azi) Wellpath: NK -14A Survey Calcul ation Method: Minimum Cu rvature Db: Oracle Survey _ • _. - MD Inc! Azim '1'VD Sys TVD ti/S E/W MapN MapE 7bol ft deg deg ft ft ft ft ft ft 16625.00 66.54 333.44 8523.60 8463.80 11730 79 -5264.68 5991464.10 716008.72 GYD-GC-MS 16650.00 66.59 333.50 8533.55 8473.75 11751.31 -5274.93 5991484.31 715997.87 GYD-GC-MS 16675.00 66.64 333.57 8543.47 8483.67 11771.85 -5285.15 5991504.54 715987.05 GYD-GC-MS 16700.00 66.69 333.63 8553.37 8493.57 11792.41 -5295.36 5991524.79 715976.24 GYD-GC-MS 16725.00 66.74 333.69 8563.25 8503.45 11812.99 -5305.55 5991545.06 715965.44 GYD-GC-MS 16750.00 66.83 333.75 8573.11 8513.31 11833.59 -5315.72 5991565.35 715954.67 GYD-GC-MS 16775.00 66.91 333.82 8582.93 8523.13 11854.22 -5325.88 5991585.67 715943.91 GYD-GC-MS 16800.00 67.00 333.88 8592.72 8532.92 11874.87 -5336.02 5991606.01 715933.16 GYD-GC-MS 16825.00 67.09 333.94 8602.47 8542.67 11895.54 -5346.14 5991626.37 715922.43 GYD-GC-MS 16850.00 67.01 333.99 8612.21 8552.41 11916.23 -5356.24 5991646.75 715911.72 GYD-GC-MS 16875.00 66.94 334.04 8621.99 8562.19 11936.91 -5366.32 5991667.12 715901.03 GYD-GC-MS 16900.00 66.86 334.08 8631.80 8572.00 11957.59 -5376.38 5991687.49 715890.37 GYD-GC-MS 16925.00 66.79 334.13 8641.64 8581.84 11978.26 -5386.42 5991707.86 715879.72 GYD-GC-MS 16950.00 66.66 333.97 8651.52 8591.72 11998.91 -5396.47 5991728.21 715869.07 GYD-GC-MS 16975.00 66.52 333.82 8661.45 8601.65 12019.52 -5406.57 5991748.50 715858.37 GYD-GC-MS 17000.00 66.39 333.66 8671.44 8611.64 12040.07 -5416.71 5991768.74 715847.63 GYD-GC-MS 17025.00 66.25 333.50 8681.48 8621.68 12060.57 -5426.89 5991788.94 715836.84 GYD-GC-MS 17050.00 66.29 333.48 8691.54 8631.74 12081.05 -5437.11 5991809.10 715826.02 GYD-GC-MS 17075.00 66.33 333.47 8701.58 8641.78 12101.54 -5447.33 5991829.27 715815.20 GYD-GC-MS 17100.00 66.38 333.45 8711.61 8651.81 12122.03 -5457.56 5991849.45 715804.36 GYD-GC-MS 17125.00 66.42 333.43 8721.62 8661.82 12142.52 -5467.81 5991869.63 715793.52 GYD-GC-MS 17150.00 66.53 333.46 8731.60 8671.80 12163.02 -5478.06 5991889.82 715782.67 GYD-GC-MS 17175.00 66.64 333.50 8741.53 8681.73 12183.55 -5488.30 5991910.03 715771.82 GYD-GC-MS 17200.00 66.75 333.53 8751.42 8691.62 12204.10 -5498.54 5991930.27 715760.98 GYD-GC-MS 17225.00 66.86 333.56 8761.27 8701.47 12224.67 -5508.78 5991950.53 715750.14 GYD-GC-MS 17250.00 67.04 333.60 8771.06 8711.26 12245.27 -5519.01 5991970.82 715739.30 GYD-GC-MS 17275.00 67.21 333.65 8780.78 8720.98 12265.91 -5529.24 5991991.15 715728.46 GYD-GC-MS 17300.00 67.39 333.69 8790.42 8730.62 12286.58 -5539.47 5992011.50 715717.63 GYD-GC-MS 17325.00 67.57 333.73 8800.00 8740.20 12307.28 -5549.70 5992031.90 715706.79 GYD-GC-MS 17350.00 67.74 333.53 8809.50 8749.70 12328.00 -5559.97 5992052.30 715695.91 GYD-GC-MS 17375.00 67.91 333.33 8818.94 8759.14 12348.71 -5570.33 5992072.69 715684.95 GYD-GC-MS 17400.00 68.07 333.13 8828.31 8768.51 12369.40 -5580.77 5992093.06 715673.90 GYD-GC-MS 17425.00 68.24 332.93 8837.61 8777.81 12390.08 -5591.29 5992113.42 715662.77 GYD-GC-MS 17450.00 68.26 332.92 8846.88 8787.08 12410.76 -5601.86 5992133.78 715651.60 GYD-GC-MS 17475.00 68.29 332.91 8856.13 8796.33 12431.44 -5612.43 5992154.13 715640.42 GYD-GC-MS 17500.00 68.31 332.90 8865.37 8805.57 12452.11 -5623.01 5992174.49 715629.23 GYD-GC-MS 17525.00 68.33 332.89 8874.61 8814.81 12472.79 -5633.60 5992194.85 715618.04 GYD-GC-MS 17550.00 68.26 332.85 8883.85 8824.05 12493.47 -5644.19 5992215.19 715606.84 GYD-GC-MS 17575.00 68.18 332.81 8893.13 8833.33 12514.12 -5654.79 5992235.52 715595.64 GYD-GC-MS 17600.00 68.10 332.76 8902.44 8842.64 12534.75 -5665.40 5992255.83 715584.42 GYD-GC-MS 17625.00 68.03 332.72 8911.78 8851.98 12555.37 -5676.02 5992276.12 715573.19 GYD-GC-MS 17650.00 67.89 332.53 8921.16 8861.36 12575.95 -5686.68 5992296.38 715561.94 GYD-GC-MS 17675.00 67.75 332.35 8930.60 8870.80 12596.47 -5697.39 5992316.57 715550.62 GYD-GC-MS 17700.00 67.60 332.16 8940.09 8880.29 12616.94 -5708.16 5992336.71 715539.26 GYD-GC-MS 17725.00 67.46 331.97 8949.65 8889.85 12637.35 -5718.98 5992356.79 715527.84 GYD-GC-MS 17750.00 67.64 331.85 8959.20 8899.40 12657.73 -5729.86 5992376.85 715516.36 GYD-GC-MS 17775.00 67.82 331.73 8968.67 8908.87 12678.12 -5740.79 5992396.90 715504.83 GYD-GC-MS 17800.00 67.99 331.61 8978.07 8918.27 12698.51 -5751.79 5992416.95 715493.24 GYD-GC-MS 17825.00 68.17 331.49 8987.41 8927.61 12718.90 -5762.84 5992437.01 715481.59 GYD-GC-MS 17850.00 68.08 331.67 8996.72 8936.92 12739.30 -5773.88 5992457.08 715469.95 GYD-GC-MS 17875.00 67.98 331.85 9006.07 8946.27 12759.73 -5784.85 5992477.17 715458.38 GYD-GC-MS 17900.00 67.89 332.03 9015.46 8955.66 12780.17 -5795.75 5992497.28 715446.88 GYD-GC-MS 17925.00 67.80 332.21 9024.89 8965.09 12800.64 -5806.57 5992517.42 715435.46 GYD-GC-MS sy 'J ~ ~ Halliburton Company Survey Report ~i Company: BP Amoco Date: 5/9/2006 Time: 16:19:50 Page: 14 Field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/1611 993 10:09 59.8 Well: NK -14 Section (VS) Re~ferencc: Well (O.OON,O.OOE,331.65Azi) Wellpath: NK -14A Survey Calculation Method: Minimum Cu rvature Db: Orade Survev ----- MD - tncl - - Azim TVD Sys'1'VD N/S E/W Maps' D1apE "I'ooI ft deg deg ft ft ft ft ft ft 17950.00 67.46 332.22 - 9034.41 8974.61 12821.09 - -5817.35 -- 5992537.54 715424.08 - - -- GYD-GC-MS 17975.00 67.12 332.22 9044.06 .8984.26 12841.50 -5828.10 5992557.62 715412.73 GYD-GC-MS 18000.00 66.79 332.23 9053.85 8994.05 12861.85 -5838.82 5992577.65 715401.41 GYD-GC-MS 18025.00 66.45 332.23 9063.77 9003.97 12882.16 -5849.51 5992597.63 715390.13 GYD-GC-MS 18050.00 66.24 332.36 9073.80 9014.00 12902.43 -5860.16 5992617.57 715378.89 GYD-GC-MS 18075.00 66.03 332.50 9083.91 9024.11 12922.70 -5870.74 5992637.52 715367.71 GYD-GC-MS 18100.00 65.82 332.63 9094.11 9034.31 12942.95 -5881.26 5992657.46 715356.60 GYD-GC-MS 18125.00 65.61 332.76 9104.39 9044.59 12963.20 -5891.71 5992677.39 715345.55 GYD-GC-MS 18150.00 65.18 332.70 9114.80 9055.00 12983.41 -5902.12 5992697.27 715334.55 GYD-GC-MS 18175.00 64.74 332.65 9125.38 9065.58 13003.53 -5912.52 5992717.08 715323.56 GYD-GC-MS 18200.00 64.31 332.59 9136.13 9076.33 13023.57 -5922.90 5992736.80 715312.59 GYD-GC-MS 18216.00 64.03 332.55 9143.11 9083.31 13036.35 -5929.53 5992749.38 715305.58 MWD 18247.62 66.97 323.89 9156.24 9096.44 13060.76 -5944.69 5992773.33 715289.72 MWD 18277.06 72.86 316.02 9166.36 9106.56 13081.88 -5962.48 5992793.91 715271.31 MWD 18307.72 76.82 308.04 9174.39 9114.59 13101.66 -5984.45 5992813.03 715248.76 MWD 18337.98 79.89 300.40 9180.50 9120.70 13118.30 -6008.94 5992828.94 715223.79 MWD 18366.56 78.49 293.39 9185.87 9126.07 13130.99 -6033.96 5992840.89 715198.41 MWD 18397.31 76.99 286.05 9192.41 9132.61 13141.13 -6062.22 5992850.18 715169.86 MWD 18426.76 80.24 278.66 9198.23 9138.43 13147.29 -6090.40 5992855.51 715141.52 MWD 18459.99 85.08 268.29 9202.48 9142.68 13149.27 -6123.24 5992856.51 715108.63 MWD 18487.97 88.15 262.84 9204.14 9144.34 13147.11 -6151.07 5992853.53 715080.88 MWD 18535.03 95.33 244.40 9202.70 9142.90 13133.92 -6195.98 5992839.02 715036.38 MWD 18566.51 95.77 244.75 9199.65 9139.85 13120.47 -6224.28 5992824.74 715008.49 MWD 18599.97 93.66 239.11 9196.90 9137.10 13104.78 -6253.69 5992808.19 714979.56 MWD 18632.85 93.57 237.35 9194.82 9135.02 13087.51 -6281.59 5992790.10 714952.19 MWD 18665.58 93.48 231.00 9192.81 9133.01 13068.40 -6308.06 5992770.22 714926.29 MWD 18694.91 93.22 231.18 9191.10 9131.30 13050.01 -6330.85 5992751.16 714904.06 MWD 18729.65 93.30 228.54 9189.12 9129.32 13027.65 -6357.36 5992728.03 714878.22 MWD 18765.32 93.92 219.90 9186.87 9127.07 13002.16 -6382.16 5992701.82 714854.19 MWD 18798.31 94.27 215.85 9184.51 9124.71 12976.19 -6402.36 5992675.27 714834.76 MWD 18829.42 94.36 213.56 9182.17 9122.37 12950.69 -6420.02 5992649.26 714817.87 MWD 18859.83 94.89 209.86 9179.72 9119.92 12924.91 -6435.95 5992623.02 714802.71 MWD 18890.36 95.24 203.69 9177.02 9117.22 12897.77 -6449.64 5992595.49 714789.82 MWD 18920.65 96.04 202.28 9174.04 9114.24 12870.02 -6461.41 5992567.41 714778.88 MWD 18960.48 96.04 193.47 9169.85 9110.05 12832.36 -6473.56 5992529.41 714767.85 MWD 18995.38 94.45 190.47 9166.65 9106.85 12798.37 -6480.77 5992495.22 714761.65 MWD 19020.34 93.39 188.01 9164.95 9105.15 12773.79 -6484.76 5992470.53 714758.39 MWD 19051.40 93.13 185.01 9163.18 9103.38 12742.99 -6488.28 5992439.64 714755.78 MWD 19084.71 93.30 178.49 9161.31 9101.51 12709.76 -6489.29 5992406.40 714755.75 MWD 19114.91 93.13 172.85 9159.62 9099.82 12679.71 -6487.02 5992376.43 714758.91 MWD 19143.83 92.78 173.38 9158.13 9098.33 12651.04 -6483.56 5992347.87 714763,22 MWD 19150.00 92.91 174.01 9157.82 9098.02 12644.91 -6482.88 5992341.77 714764.08 MWD 19177.40 88.99 168.62 9157.36 9097.56 12617.85 -6478.74 5992314.84 714769.01 MWD 19208.79 93.04 167.39 9156.81 9097.01 12587.15 -6472.22 5992284.35 714776.44 MWD 19237.60 97.80 167.04 9154.09 9094.29 12559.19 -6465.88 5992256.59 714783.61 MWD 19276.83 100.62 172.85 9147.80 9088.00 12521.08 -6459.11 5992218.70 714791.50 MWD 19308.03 102.56 175.67 9141.54 9081.74 12490.68 -6456.05 5992188.40 714795.45 MWD 19352.74 103.35 184.66 9131.49 9071.69 12447.16 -6456.17 5992144.90 714796.62 MWD 19399.29 99.82 190.47 9122.14 9062.34 12401.98 -6462.19 5992099.57 714791.94 MWD 19435.03 98.33 193.29 9116.50 9056.70 12367.45 -6469.45 5992064.84 714785.70 MWD 19464.82 101.15 195.23 9111.46 9051.66 12339.00 -6476.68 5992036.18 714779.32 MWD 19518.86 102.56 203.87 9100.34 9040.54 12289.21 -6494.35 5991985.90 714763.13 MWD .r '_ • Halliburton Company Survey Report Company: BP Amoco llate: 5/9/2006 Timr. 16:19:50 Page: 15 ~~ Field: Niakuk Co-ordinate(NE) Reference: Well: NK-14, True North Site: NK Main Pad Vertical (TVD) Reference: 10:14 10/16/1993 10:09 59.8 Wcll: NK-14 Section (VS) Reference: Well (0.OON,O.OOE,331.65Azi) ~Vcllpath: NK-14A Survey Calculation Method: Minimum Curvature Dh: Oracle Su r~ ey 111 D Incl Azim TVD Sys TVD N/S E/W h1apA MapE fool ft deg deg ft ft ft ft ft ft 19548.11 103.00 208.80 9093.86 9034.06 12263.65 -6507.00 5991959.98 714751.24 MWD 19581.76 101.94 211.09 9086.60 9026.80 12235.18 -6523.40 5991931.04 714735.69 MWD 19613.10 100.70 216.91 9080.44 9020.64 12209.72 -6540.58 5991905.08 714719.27 MWD 19639.27 100.62 219.55 9075.60 9015.80 12189.52 -6556.50 5991884.42 714703.97 MWD 19660.00 100.62 219.55 9071.78 9011.98 12173.81 -6569.47 5991868.33 714691.46 MWD SARAH PALIN, GOVERNOR dJ~1[>•-7~ Dii! ~ ~ 333 W. 7th AVENUE, SUITE 100 C~~s~RQ~-~~l` CO~IIsSj~~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Christopher Stone Niakuk Production Engineer BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Niakuk Oil Pool, PBU NK-14A Sundry Number: 307-122 Dear Mr. Stone: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this ~- day of April, 2007 Encl. Sincerely, ~~ ~ STATE OF ALASKA ~ i? APR. ~ 6 2007 ~ f AL A OIL AND GAS CONSERVATION COM a SIGN ,~~~~ ~~' & ~a~ COn~ Commission --~ APPLICATION FOR SUNDRY APPROVALS ~1~ ~~_ ._ 20 AAC 25.280 I~ Anchorage 1. Type of Request: Abandon ^ Suspen Operational shutdown ^ Perforate ^ Waiver ^ Other Alter casing^ Repair well ^ Plug Perforations Stimulate ^ Time Extension ^ CMT Plua SQZ Change approved program ^ Pull Tubing^ Perforate New Pool ^ Re-enter Suspended Weil ^ OH Section of Well 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Ex location Alaska Inc. Development ^ Exploratory ^ 206-031 ~ 3. Address: Stratigraphic ^ Service ^ 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22668-01-00 r 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Q S i E ti R i d? Y ^ N PBU NK-14A' xcep equ re o pac ng on es 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADL 034625' 59.8' ~ Prudhoe Ba Field /Niakuk Pool' 12. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 19660 9072 17879 9008 Dec-48 None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 94# H-40 80' 80' 1530 520 Surface 6377 13-3/8" 68# L-80 6417' 4518' 5020 2260 Intermediate 18083 9-5/8" 47# NT-80 18121' 9103' 6870 4760 Production Liner 257 7" 29# NT-80 17962' - 18219' 9039' - 9144' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade:.. Tubing MD (ft): None None 4-1/2" 12.6# NT-80 NT-80 17982' Packers and SSSV Type: Packers and SSSV MD (ft): 9-5/8" x 4-1/2" TIW 'HBBP' PKR 17925' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development Q Service ^ 15. Estimated Date for 16. Well Status after proposed work: Commencing Operations: May 1, 2007 Oil Q Gas ^ Plugged `~ Abandoned ^ 17. Verbal Approval: Date" WAG ^ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Christopher Stone 564-5684 Printed Name Christopher Stone Title Niakuk Production Engineer Prepared By Name/ Phone # Signature ~ ~'' 1-G one 564-5684 Date 04/05/2007 DeWavneR.Schnorr564-5174 ///PPP YI COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity '~ BOP Test Mechanical Integrity Test ^ Location Clearance ^ Other: ~~~~ ~ r`~ r1~ ~-'L,~~~ '~~ T ~'n~'~,~~-©~ ~ W SS ~ v"L ` \ \ S BFI APR ~ 3 1001 Subsequent Form Required: ~~ APPROVED BY ~// D n ~i'~ ' Approved by: O MISSIONER THE COMMISSION Date: / Form 10-403 Revised 06/2006 U ~' ~~~ • 1 L `"~ ~~~ ~/~~ in Duplicate by ~ April 4, 2007 Alaska Oil & Gas Conservation Commission Attention: Mr. Tom Maunder 333 West 71h Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Tom Maunder: Reference: Sundry Notice for NIA-14A -Cement Plug Abandonment Alaska Oil & Gas Cons. Commission Anchorage BP Exploration (Alaska) Inc. proposes to plug the horizontal sidetrack on well NK-14A. Attached is the program for plugging the well. Work Summarv: Step Tvne Summarv 1 C Pull 3-3/8" IBP @ 17,879' MD 2 C Circulate tubing w/9.0 ppg NaCI brine from 4,500' MD to surface 3 FB Perform a short formation infectivity test . 4 C Run memory GR/CCL for depth correlation 5 C Set Baker Inflatable Cement Retainer with Spotting Valve with top of assembly @ 18,198' MD. Ref: Injection Profile 10/6/97. 6 C Pump cement below retainer. Lay cement above retainer. Wash tubing with biozan. 7 C Freeze protect tubing and IA. 8 O Perform MIT-T to 3000#. 9 S Tag TOC. The work on this well will begin when approval is received from your organization. If you have any questions, comments, or concerns please contact me at 564-5684. Sincerely, / I vl~ ~~ Christopher Stone GPMA - Niakuk Production Engineer BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 19071561-5111 E~~~~E~ Attachment :Detailed Work Program To: C. Olsen / J. Bixby GPB Well Ops Team Leaders From: Christopher Stone Niakuk Production Engineer Subject: NK-14A Cement Plug Abandonment AFE: NED 5L0547 Date: 4/4/2007 Estimated Cost: $250,000 IOR: Regulatory Compliance Please plug and abandon the open hole section in NK-14A as per the following procedure: Step Type Summary 1 C Pull 3-3/8" IBP @17,879' MD 2 C Circulate tubing w/9.0 ppg NaCI brine from 4,500' MD to surface 3 FB Perform a short formation infectivity test 4 C Run memory GR/CCL for depth correlation 5 C Set Baker Inflatable Cement Retainer with Spotting Valve with top of assembly @ 18,198' MD. Ref: Injection Profile 10/6/97. 6 C Pump cement below retainer. Lay cement above retainer. Wash tubing with biozan. 7 C Freeze protect tubing and IA. ' 8 O Perform MIT-T to 3000#. 9 S Tag TOC. Well Data: Status: Shut-In Oil Production Well BHP: 4,237 psi @ 9,000' TVD SS Max Deviation: 103° @ 19,352' MD Min ID: 3.8" @ 17,696' MD (4-1/2" HES `XN' Nipple) Last TD Tag: 19,660' MD on 5/4/2006 (CTU Sidetrack) Last Downhole Ops: On 5/3/06 a 3-3/8" IBP set in 4-1/2" tubing @ 17,879' -17,890' MD (Center at 17,885' MD) H2S: 55ppm 10/4/2005 AnnComm: Poor Tubing (TxIA communication) Background: The parent well, NK-14, was a low rate oil producing well which was shut-in prior to the CTD sidetrack due to low productivity. On 3/27/06 a MIT on the IA failed. On 4/2/06 a tubing caliper log was run, details are presented lafier in the program. A CMIT TxIA to 3000 psi was peformed 4/4/06, the tests were inconclusive. The caliper log determined that the tubing would need to be replaced, requiring a RWO. Rather than replace the tubing via a RWO, it was decided to sidetrack this well to determine whether or not the increased oil production would justify the added expense of a RWO, required to replace production tubing. The sidetracking venture proved to be unsuccessful, and as a result the RWO was suspended and the well is currently SI. On May 3, 2006 BP applied for temporary shutdown of drilling operations on NK-14A under regulation 20 AAC 25.072. The NK-14A drilling results were disappointing because the shallow target (best quality sand) was swept and the deeper targeted sands were poorly developed or absent. There was insufficient pay to justify a completion; in addition an expensive RWO was needed in order to flow the well. Over 18,000' of tubing needed to be pulled, with the possibility of also running a 7,000' scab liner. Neither BP, nor the partners felt that the reserves in the well would support a RWO plus completion costs. On May 4, 2006, the AOGCC commission granted the operation shutdown of NK-14A. Current Well Conditions: A mechanical whipstock was set at 18,216.5' MD (top) (bottom at 18,223' MD) correlating to the Memory Jewelry Log dated 20-April-2006, a window was drilled from 18,220' - 18,226' MD with a 4-1/8" drill bit on coil tubing. Drilling operations proceeded with a horizontal lateral being drilled to 20,541' MD with 9.0 ppg drilling fluid. The well was open hole sidetracked from 19,140' - 19,160' MD when it was determined that the 2FS sand was not present. This operation in effect has created a "dual lateral" wellbore, both of which are openhole. A infectivity test was performed April 17, 2006 using 9.4 ppg brine. The following table illustrates the injection rates at their respective pressures. Table 1 Infectivity Test Results re 0.58 320 1.07 392 1.6 460 2.05 494 2.53 505 3.1 546 Prior to suspending drilling operations a Baker 3-3/8" Retrievable IBP was set in the tubing at 17,879' MD (center of the first joint above "X" nipple). The tubing in the well, from 4,100' -17,879' MD, was then displaced to 9.0 ppg KCUNaCL brine. Finally, the well was freeze protected with diesel from 4,100' MD to surface. Before moving off the well the CTD rig set an IBP at 17,879' MD on 5/3/2006 and a successful CMIT-TxIA pressure test was performed to 1,000 psi. 2 A caliper log was run on the tubing April 2, 2006. shape. There are multiple holes recorded in th (11,000' - 15,300'). Caution should be exercised The damage to the tubing appears to be in the f corrosion, and isolated pitting. The caliper survey reference. The 4-1/2" Tubing is in very poor e tubing between GLM #3 and #2 when tripping through this section. orm of lines of corrosion, general from April 2, 2006 is attached for Objective: The intent of this well intervention is to plug NK-14A per Alaska State Regulation 20 ACC 25.112 and to ensure that future utility of the wellbore is maintained. The plugging of the well will ensure that all hydrocarbons and freshwater are confined to their respective indigenous strata and will prevent migration of fluid into other strata or to the surface. The wellbore will also be preserved such that a future sidetrack is possible. Procedure: 1. Rig-up coil tubing unit #5 with 18,600' of HS80 1-3/4" tapered coiled tubing string. 2. Run in hole and pull 3-3/8" retrievable IBP from 4-1/2" tubing which is at 17,879'MD. 3. Document pressures on the tubing, IA, and OA. NOTE: Last bottom hole pressure on 1/18/06 was 4304 psi at 9200' SSTVD. Expect wellhead pressure to be 415 psi (based on 9.0 ppg brine from 4100' MD to TD and diesel from 4100' MD to surface). 4. Ensure that the IA is fluid packed. 5. RIH with coil to 4,500' MD circulate tubing with 80 barrels of 9.0 ppg NaCI brine. This should result in ~0 WHP. Freeze point of brine is 19°F. 6. Perform a short formation infectivity test. 7. Rig up coil tubing unit with Schlumberger Memory GR/CCL and RIH. Log well for depth correlation. Correlate to Schlumberger Injection Profile w/Warmback/Jewel Log dated October 6, 1997. 8. Pick up the Baker Inflatable Cement Retainer with Spotting Valve and set per Baker specifications such that top of assembly is at 18,198' MD; avoiding collars. Reference log for depth control will be Memory GR/CCL. Do not run Cement Retainer with Spotting Valve into whipstock at 18,216' MD. Mix 8 pumpable barrels 15.8ppg Class G cement. • NOTE: Cement volume is based on 5 bbls of cement in 4-1/8" openhole below retainer, and 3 bbls of cement in 7" liner above the cement retainer Catch a sample of the cement for QC testing. ', , a ~ • Ensure all gas is out of the system. Do not proceed with squeeze unless the tubing is liquid packed and gas free. 9. Apply tension to tubing string per Baker specifications to open spotting valve. 10. Line out cementers to the CT. Pump the following down the coil: 10 bbls spacer water 5 bbls 15.8 ppg Class G cement 11.Open the choke on the backside (tubing x CT annulus). 12. With 3 bbls of cement left in the coil, un-sting coil from the cement retainer per Baker specifications and lay in the remaining 3 bbls of cement on top of the retainer, taking 1:1 returns at surface. PUH to safety 17,980' MD. With the retainer at 18,198' the top of the cement assuming 8 bbls cement (worst-case- scenario) should be approximately 17,983', this would give 215' of cement on top of the retainer. 13. Begin pumping biozan down the CT for clean out. Make a couple of passes from the cement top at 18,115' MD (3 bbls on top of retainer) to safety. Jet uphole at 80% running speed and max CT pressures, washing all jewelry thoroughly noting GLM's and TRSSV. NOTE: Tubing will need to be replaced prior to producing well in the future. Clean-out is to ensure that the TRSSV and the nipple profiles are clean and in operable condition. 14. Freeze protect tubing and IA. Post CTU Cement Plug 15. After 5 days WOC, MIT-T to 3000 psi. Note: IA pressure should track tubing pressure. 16. If MIT-T passes rig up slickline and drift well to TOC at approximately 18,115' MD. Use a nipple and tie into X profile Report depth to Anchorage PE Chris Stone @ stonc1 @bp.com. If you have any questions or concerns regarding this program, please contact: • Chris Stone at 564-5684 (work) or 440-4011 (cell) • Ross Warner at 564-5359 or 250-3441 (cell) cc: Well File Amy Frankenburg ANC Well Work Program Ross Warner GPB, LPC DS Ops Lead GPB, LPC DS Ops 4 • PDS Caliper Loa April 2, 2006 ('c~rre~htirm c,f Rc~c~ur~l~~cl t ).unage tc~ Hcyrehc~lt-' I'rcat'ric~ ^ 11pr a 4,5 iu (15.7'- 17479,d'~ weA: NK-IA Fiakk Alialnik Crrnrtiatty` HI' F.rpkar:~tita~ G1latitak bye t_atn~ry: LISA Surw-y fhttr: /y~nl Z. 2[N)[t ^ :\hlttu~. I rxd fTrtiuticni ^ .'y~xrn. ikxrlwlr PnytiM I.~LA1 -0 ~ .LM ! - .1 h~l 1 Nnttrnn i~l' tit~rvwy = 418`2 5 • • WellboreSchematic TREE- 3' CI`N «.~~__ 3F.~B/= <OP = - ~~ Angle _- ~atu m MD = ~atu m TV D = Minimum ID = 3.80" @ 17969' 4-112" HES'XN' NIPPLE TOP OF 7" LNR 4-1 f2" HES'XN FJP, D = hLLED TO 2.BM, NT-80, 0152 hpl, ID = 3958' I 9sle- csq a7+~, Nr-eo, ID = 6.6e1 ° I PERFORATION SUh11MRY REF LOG: FhRlGR ON 05122196 ANGLEATTOPP8~F:63° Q 18220' Note: Refer to Aoduetion DB far hs;tork:al perf data SC'E SPF BJTHiVAL OpNSgz DATE 2-118' 6 18220-18240 Sqz 04'1tL'O6 a~1r2' S 18258-18276 Sqz 04'1&'06 4 ~ 1 ~7" 5 18284 - 18418 Sqz 04'1806 14118' OPEN FULELATERAL FAAYJ HOLE 1 W9Ja7W 18220' - 18226' qA F~+rAG 18225.5' FA LEDhE01ANICAL'NHIPSTOGK 16240' RA PIPTt,i; 18250' PsrD 18612' ST MD TVD DEV TYF~ VLV LATCH FORT DATE 4 4004 3510 54 OT1S TB OOhE RA i6 04104/02 3 11059 6431 04 OTIS TB SO RA 24 04104;02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTC TH DMY RA BkF2 3 '_, F' f~fF=1EJ,18~E EP 4~112'N~.HESX,O=3.813' 9-SfB' X 4-112" TFN HBBP PKR, VGA NCHOR LA T(xl, ID = 3.916" 9-518' X T T1F~AgC. BAKER LNR TOPPKR 8 FLEXIOCK LNR HGR, ID= 6.313" 17882' f-{ 11l2"TUBNGTAIWLEG 17980' ELMD TT -LOGGED 10,'06.' a t I 20541' I 18612' FISH-2ROLLERSAND2ALLBJ SCREWS OFF ROLLER STE1N 8113196 DATE REV BY COMh£NTS DATE REV BY rOhfAEFJTS 06108r96 ORIG COhPLET10N, jF'OOL 71 0331;03 EGG'TLH NCSS UPDATE 02;27101 SISLG FMIAL - ~ 'CIC t CTDSDETRACK OSi16r'O1 RN?P CORRECTIONS 09/20,'01 DRS+KK PACKER CORRECfiON 09:26.+01 C`NS!'KK F'62FS 04104;02 RLIR.H GLV UPDATE NIAKUK UNR WELL: NK-14A FERMff No: 206.031 API No: 50.029.22668.01 Sec. 36, T12N, Rt SE 2199.25 FEL 1321.43 FNL ~ Expbration (Alaskaf N K -14 A SAFfT`f NOTES: W ELL HAS TBG~IA COMMUNICATION FROh9 DRL'~ ~)R~=~ (SUSPENDED 05-04-06) 2120' 4112' TRSV, HES SERIES • ne c ~ icr w urwa c 7 • „~, 1 ,,: Wf ilhFAtl• F~t3.'i,H _ l1+IV1'HYAI ACIINR;{t- 8ANI1 -- - _- - KiS ELLV - 5!1 d rw. CLCV • ,.t AJ KC%'- - ~.L~n.n W = 18224 laloan I`rD= 921.t0':3:i MinlFrnu'~ i s ~n l(~ 17989' 4.1 f2" HES'XN' NIPPLE ror 9 8.9x8' C6Q 1'16. Mr•80, O ~ 8.681' TiroE+•~td C.r.~'L~n•~ ~kc~ 'MIDt7vr 1620' - 18??6' ~--~ r.~-~.: ~-{ tazzs s1 hAtkU i~Rfi}RA iDN 91AMM RV REF LOS FMi1GR ON 05J22'86 An[iLEATitSPPERF:tl~' ®187X1 note taste! w i'roducFnn UB Far nWwlcri It it.fla SQE 9tF Al Opnr, ut I I '1•J,'8' 4 1; r 8 9 18220. 18240 187118. 182!8 .I~ . v 4• itT' S 18764 - ttlA18 -s t ~' i:N t ~ ~~ .11f 'r FIY ~ nMN+ h''. i viii?w,!-ci GYaU CCAta I-IKirr :rr :~Ol. T) OOr31N3 BG(Y11.M TY0661~01-iE li: l',l?I :iCi ..^ F-y4L OCJDlrt15 JlR F+OiiDIG1 CID $CEFRA t7( G~~'~~s~61 I+PI'tF' OOPIEEL`IIC:ftti C:I~b:b61 DZS~KK FiACICBiOC1H~GT1CiN 1:'l~!'a'1;.1 S:tV:i~'CK F3 NF `i Pa~A4iC: ~Ufl ~l OLV ~_I'Y)ATE FJ11KU1f tltlf 'M'LL ~ M(• 14A P~1lt No:: i n u.~ i AR Fb. 50.029-228B0-0f Sa[ 38. T12N, APSE, 219!;1 25 F$ 1327. 6PlFplO-tllon (AMrrMr) f,OMYlNBCATION f ROM ORLG - [)RAi f (3USPENDEO 05-04-06) D = 3.813' t1A91 Ft WL NfIRfI.9 yl bt) 1 U U6Y tYPf YlV 6ATC}I LVStE 4 J 2 i 4001 t 1068 15278 t 1842 .lrJtO 041 1!07'9 9104 84 84 97 8N t)T8'f[! GTN 1fJ OrB B tltt9 Fd (X,Nti 8f5 Qf,T1' OMY tfA t1A ttA RA I 24 WiD4fi7 M~Uar102 11 79~ t' j nGJe•x4U7'thY1~8Pr~, I wArrxtureurrx o=a9te- 17'9~ ,-trrFles•x•Nr,D-3at3- 1711i2' ta•attr x J• nr~etacx, r>rttten Lrw rlaP twc~ ~ F~e~at3uK f_NW tt[IR,1D • s,a1 r ~ 17962' _ ~ t rz' rfeFNG rn ~ tnaEc 17940' E1bQ1T LUG6~ tOuLd97 __17~ a p ^' ~p r11 Ci ~ ~N1~ g • • Review of Sundry Application 307-122 BP Exploration (Alaska) Inc. Well Prudhoe Bay Unit NK-14A Prudhoe Bay Field, Niakuk Oil Pool AOGCC Permits 206-031 Requested Action: BP Exploration (Alaska) Inc. (BPXA) proposes to plug the existing well for potential future sidetracking. Recommendation: I recommend approval of BPXA's proposed actions Discussion: Well NK-14 was a poor producing well that BPXA sidetracked in 2006 to create the NK- 14A wellbore. BPXA and partners decided not to complete the sidetrack because one of the two sand lobes that were targeted by the sidetrack was already swept and the other lacked sufficient pay. The well has been in AOGCC approved operational shutdown status since May 4, 2006. Since the original wellbore was plugged prior to the sidetracking operation and the sidetrack was not completed, and is possibly inaccessible due to the wellbore collapsing, the well has no current usefulness. Setting a plug to isolate the sidetrack from the remainder of the wellbore so that the well could possibly be sidetracked again in the future is a prudent operational decision. Conclusion: This well is currently providing no benefit to field operations. The best use of this well is to prepare it for a possible future sidetrack. D.S. Roby ~~~~~ Reservoir Engineer April 10, 2007 • • 16-May-06 AOGCC Ceresa Tolley 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well NK-14A Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 19,143.83' MD Window /Kickoff Survey: 19,639.27' MD (if applicable) Projected Survey: 19,660.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 ____.~. Date ~? ,~~ ~ a6 ~D Signed ~- Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) • • 16-May-06 AOGCC Ceresa Tolley 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well NK-14A PB1 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: 18,225.00' MD Window /Kickoff Survey: 20,516.15' MD (if applicable) Projected Survey: 20,541.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 f a Date ~ 7 Jug-~~~ ~ Signed Please call me at 273-3545 if you have any questions or concerns. Regards, Carl Ulrich Survey Manager Attachment(s) STATE OF ALASKA ~pL ~~~~/O~ ALASK~IL AND GAS CONSERVATION C~IVIISSION r ,, , REPORT OF SUNDRY WELL OPERATIONS_ 1. Operations Performed: ^ Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Other ^ Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Re-Enter Suspended Well Q Change Approved Program ®Operation Shutdown Q Perforate Q Time Extension 2. Operator Name: 4. Well Class Before Work: 5. ermit o ri um er: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 206-031 ress: ^ Stratigraphic ^ Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22668-01-00 7. KB Elevation (ft): 59 8, 9. Well Name and Number: PBU NK-14A 8. Property Designation: 10. Field /Pool(s): ADL 034625 Prudhoe Bay Field / Niakuk Pool 11. Present well condition summary Total depth: measured 19660 feet true vertical 9072 feet Plugs (measured) 17879 Effective depth: measured 17879 feet Junk (measured) None true vertical 9008 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1530 520 Surface 6377' 13-3/8" 6417' 4518' 4930 2270 Intermediate 18083' 9-5/8" 18121' 9103' 6870 4760 Production Liner 738' 7" 18219' - 18219' 9144' - 9144' 8160 7020 Perforation Depth MD (ft): None Perforation Depth TVD (ft): None 4-1/2", 12.6 NT-80 17982' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" TIW 'HBBP' packer 17925' 12. Stimulation or cement squeeze summary: Intervals treated (measured): R~~ ~F~ MAC' ~ ~ 2006 Treatment description including volumes used and fin al pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after proposed work: ^ Exploratory ®Development ^ Service ® Dail Report of Well Operations y ® Well Schematic Diagram 16. Well Status after proposed work: ® Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 1 ereby certi that the oregoing is true an correct tote est o my now edge. Sundry Number or N/A if C.O. Exempt Contact Sean McLaughlin, 564-4387 306-161 Printed Name Terrie Hubble Title Technical Assistant ~~c- Prepared By Name/Number: Signature Phone 564-4628 Date W ~b ~(p Terrie Hubble, 564-4628 Form 10-404 Revised 04/2006 ~ ~ ~ ~ ~ ~ ~ ~ submit Vngmai curry TREE _ 4" CMI N K-14A S NOTES: WELL HAS TBGJIA COMMUNICATION FROM DRLG -DRAFT (SUSPENDED 05-04-06) 2120' 4-1/2" TRSV, HES SERIES 10 NIP, ID = 3.813" • GAS LIFT MANDRELS WELLHEAD= FMC 13-5/8" UNN ERSA L ACTUATOR= BAKER KB. ELEV = 59.8' BF. ELEV = 24.03' KOP = 18216' Max Angle = 103.35' @ 19352' Datum MD = 18224' Datum ND = 9200' S5 13-3/8" CSG, 68#, L-80, ID = 12.415" ~~ 6417' Minimum ID = 3.80" @ 17969' 4-1 /2" HES'XN' NIPPLE I TOP OF 7- LNR H 1796r 41 /2' HES 'XN' NP, ID = MiLED TO 3.80" 179 4-1/2" TBG, 12,6#, NT-80, .0152 bpf, ~= 3,958" 17982' 9-5/8" CSG, 47#, NT-80, ID = 8.681" H 18121' ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OTIS TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB DMY RA 17879' BKR 3-3/8" RETRIEVABLE IBP 17913' 4-1/2" NIP, HES X, ID = 3.813" 17925' 9-5/8" X 41/2" TNV HBBP PKR, W/ANCHOR LATCH, ID = 3-916" ~ 17949' 41/2" HES 'X' NIP, ID = 3.813" 17962' 9-5/8" X 7" TIEBACK, BAKER LNR TOP PKR & FLD(LOCK LNR HGR, ID = 6.313" 171 982' I~ 41 /2" TUBING TAIL WLEG 17980' ELMD TT -LOGGED 10/06/97 4-1/8" OPEN HOLE LATERAL MAIN HOLE I-( 19660' MECHANICAL WHIPSTOCK I~ 18215' r WMDOW 18220' - 18226' RA PP TAG 18225.5' FAILED MECHANICAL WHIPSTOCK 18240' RA PIP TAG 18250' PERFORATION SUIN~MRY REF LOG: FMT/GR ON 05/22/96 A NGLE AT TOP PERF: 63° ~ 18220' Note: Refer to Productan DB for historical pert data S6?E SPF INTERVAL Opn/Sqz DATE 2- 7 /8" 6 18220 - 18240 Sqz 04/18/06 4-1/2" S 18256-18276 Sqz 04!18/06 4-1/2" 5 18284-18418 Sqz 04/18/06 PBTD 18612' 7" LNR, 29#, NT-80, .0371 bpf, ID = 6.184" 18700' FISH - 2 ROLLERS AND 2 ALLEN SCREWS I OFF ROLLER STEM 8/13/96 DATE REV BY COMMENTS DATE REV BY COMMENTS 06/08/96 ORIG COMPLETION, (POOL 7) 03/31/03 BGG/TLH NDSS UPDATE 02/27/01 SIS-LG FINAL 05/04/06 JUE NORDIC-1 CTD SIDETRACK 05/16/01 RN/TP CORRECTIONS 09/20/01 DRS/KK PACKER CORRECTION 09/26/01 CWS/KK PERFS 04/04/02 RL/TLH GLV UPDATE NIAKUK UNff WELL: NK-14A PERMfT No: 206-031 API No: 50-029-22668-01 Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL BP Exploration (Alaska) OPEN HOLE S/T I~ 19150' 4-1/8" OPEN HOLE LATERAL PLUGBACK#1 I-1 20541' BP EXPLORATION Page 1 of 14 Operations Summary Report Legal Well Name: NK-14 ~ Q~ Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From -To Hours Task Code NPT Phase Description of Operations 4/14/2006 18:00 - 19:00 1.00 RIGD P PRE Prep rig for move. Meanwhile LRS bullhead 290bb1s of 9.4ppg KCL into NK-14 ~ 5bpm & 1475psi. Final pressures: THP/IAP/OAP = 150/960/160psi. SI SSSV & bleed off THP from 150psi to Opsi in 10secs. 19:00 - 19:30 0.50 MOB P PRE Move rig off well NK-61 A, spot on location while performing NK-14 pad prep 19:30 - 20:00 0.50 MOB P PRE Performing pad prep 20:00 - 20:45 0.75 MOB P PRE RU crane, PJSM on CT reel swap 20:45 - 23:00 2.25 MOB P PRE Swap reels with crane. Install 2 3/8" reel with -20700' of coil. No problems. 23:00 - 23:45 0.75 MOB P PRE Finished pad prep. Prepared NK-14 for rig, spotted mats, jacked up rig, moved control panel for TRSV f/ NK-61 to NK-14 23:45 - 00:00 0.25 MOB P PRE SAFETY MEETING. Held safety meeting before backing rig over well. Reviewed procedure, hazards and mitigation for backing rig over well. 4!15/2006 00:00 - 00:30 0.50 MOB P PRE Back rig over well with no problems. ACCEPT RIG AT 00:30 HRS, 04/15/2006. 00:30 - 01:30 1.00 RIGU P PRE General rig up. Spot trailers, tanks, RU TRSV panel on NK-14 01:30 - 04:30 3.00 BOPSU P PRE N/U BOPE's, hydraulic lines, RU cellar 04:30 - 14:00 9.50 RIGU P PRE RU & change out injector gripper blocks for 2 3/8" CT. Replace 25 broken injector pins & service injector. Meanwhile R/U & held PJSM for PT BOPE. 14:00 - 20:00 6.00 BOPSU P PRE Grease tree valves & perform initial BOPE pressure & function test. AOGCC test witness waived by Jeff Jones. BOP test witnessed by John Egbejimba & Richard Bordes BP WSLs. Meanwhile fill rig pits with 9.0 ppg KCUNaCL brine. 20:00 - 00:00 4.00 RIGD P PRE Wt Up pits # 2 and 3 f/ 9.0 ppg to 9.4 ppg while Installing pack-off, pull cable thru injector to reel, Install internal CTC, Pull back thru injector, install two RA PIP Tags in Whipstock Tray, RU to install Baker CTC 4/16/2006 00:00 - 02:00 2.00 RIGU P PRE Install Baker CTC, pull test CTC, Install dart catcher. Pump 5bbls of 9.4 ppg Brine ahead, Load wiper dart. Launch & chase with 9.4 ppg brine, Dart hit ~ 82.6 bbls. retrieved dart, RD dart catcher sub, Press test CTC, Hard line, inner reel valve to 500 & 4000psi - OK. t 02:00 - 02:30 0.50 KILL N DPRB PRE MU nozzle, MHA, stab Injector 02:30 - 03:00 0.50 KILL N DPRB PRE RIH to 815', Circ out 10 bbls of McOH, Closed choke, pumped thru SSSV, opened SSSV w/ 3600 psi control line pressure, RIH to 2526', pumping 9.4 ppg brine at .90 bpm, 432 psi w/ 250 psi back pressure, flowing increased, mw in/out 9.4 ppg 03:00 - 03:45 0.75 KILL N DPRB PRE Shut down pumps, shut in, monitor well, shut in WHP 530 psi, Wt Up pits to 9.4 ppg, Notffied BP Drlg Eng of situation 03:45 - 05:40 1.92 KILL N DPRB PRE Bullhead down CT at minimum rate .16 bpm at 390 psi moving fluid to keep CT from freezing, while Wt Up pits to 9.4 ppg and monitor weH, WHP 450 PSI. 05:40 - 06:00 0.33 KILL N DPRB PRE RIH, Circ at 1.32 bpm, 700 psi, maintaining 475 psi back pressure, retums .95 bpm with 7.62 ppg, IA 1000 psi, OA 190 psi, taking retums to tiger tank, PVT 312 bbls of 9.4 ppg brine, at present - MW iNout .9.5 ppg/ 9.2 ppg, PVT 287 06:00 - 08:20 2.33 KILL N DPRB PRE Continue RIH circ ®1.31bpm/380psi. Wt check ~ 16900' Up = 45k, Run-in = 8k. RIH to 18500' (below btm perf). 08:20 - 11:15 2.92 KILL N DPRB PRE Bleed off WHP & SI well. Observe WHP of 410psi. Circ Printed: 5/8/2006 11:56:25 AM $P EXPLORATION Page 2 of ~ 4 Operations Summary Report Legal Well Name: NK-14 Common W ell Name: NK-14 Spud Date: Event Nam e: REENTE R+COM PLET E Star t: 4/10/2006 End: Contractor Name: NORDIC CALIS TA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase bescription of Operations: 4/16/2006 08:20 - 11:15 2.92 KILL N DPRB PRE 580bb1s of 9.4ppg brine ~ 3.75/3.40-185bpm, 9.4ppg in/8.6-9.4ppg out, 3790psi CTP & 450psi WHP. 11:15 - 11:45 0.50 KILL N DPRB PRE Bleed off WHP & SI well. Observe Opsi WHP after 30mins. 11:45 - 13:15 1.50 KILL N DPRB PRE Continue circ 100bb1s of 9.4ppg brine in & getting 9.4ppg crude contaminated returns back. Suspect we're flushing crude from formation and/or communication in IA. Decide to POOH & P/U W/S. 13:15 - 16:45 3.50 KILL N DPRB PRE PUH to surface circ ~ 1.25bpm/660psi. 16:45 - 17:00 0.25 KILL N DPRB PRE OOH. S/B injector & L/D nozzle BHA. 17:00 - 17:15 0.25 WHIP P WEXIT Held pre-operations safety meeting. Reviewed well status, potential hazards & whipstock setting BHA M/U procedures. 17:15 - 18:00 0.75 WHIP P WEXIT M/U BKR 4-1/2" x 7" Gen-2 whipstock, wireline adapter, #10 J-Hyd setting tool, FAIV, Sperry GR/MWD, orienter & MHA [OAL = 71.43']. Scribe tools & M/U injector. GR to BOWS = 47.24'. 18:00 - 22:15 4.25 WHIP P WEXIT RIH with BKR whipstock BHA #2 to 1940'. SHT MWD with 1.43/1.21 bpm & 1440psi - OK. Pumped thru SSSV, Open SSSV, holding 3600 psi, WHP Opsi, Orient 2 clicks -got 2 for 2 clicks. Continue RIH to 18225' 22:15 - 23:45 1.50 WHIP P WEXIT Run tie-in strip logging down f/ 18225' to 18300', no clear correlation due to high GR interference, sent digital copy and faxed copy of logs to geologist on Nordic #2 for help with log correlation 23:45 - 00:00 0.25 WHIP P WEXIT Log up, run tie-in strip f/ 18300' to 18280' 4/17/2006 00:00 - 01:20 1.33 WHIP N DPRB WEXIT Log up, run tie-in strip for GR correlation f/ 18280' to 18190', unable to correlate back to tie-in log due to high GR interference 01:20 - 03:25 2.08 WHIP N DPRB WEXIT RIH to 18325', log dn, spot checking GR reference points to 18500', unable to correlate back to tie-in log due to high GR interference 03:25 - 03:50 0.42 WHIP N DPRB WEXIT POH to 17740', Geo onsite 03:50 - 05:50 2.00 WHIP N DPRB WEXIT Log do f/ 17740' - 17845' for depth correlation f/ RA tag at 17759', correlation log is Western Atlas TCP Tie-In Log Dated May 31, 1996, log has iwo RA markers in 9 5/8" casing at 17661' and 17759' 05:50 - 06:40 0.83 WHIP N DPRB WEXIT POH to 17700', Perform Tie-In pass f/ 17700' to confirm RA markers. Saw what looks like one GR spike ~ 17760' but did no! see the 2nd marker. Confirm earlier observed spike was false. ~~ 06:40 - 06:55 0.25 WHIP N DPRB WEXIT PUH to 16940' to relog GR tie-in. ', 06:55 - 08:20 1.42 WHIP N DPRB WEXIT Log down GR from 16955' to 17033' ~ 1.64/140bpm & 1835psi -getting obscured GR readings. 08:20 - 08:30 0.17 WHIP N DPRB WEXIT PUH to 16510' to relog GR tie-in. ', 08:30 - 09:40 1.17 WHIP N DPRB WEXIT Log down GR from 16510' to 16545' ~ 1.64/140bpm & 1835psi -still not able to correlate GR readings. ~ 09:40 - 10:00 0.33 WHIP N DPRB WEXIT RBIH to 17820' to relog GR fie-in. 10:00 - 11:55 1.92 WHIP P WEXIT Log down GR from 17820' to 17943' ~ 1.6M740bpm & 1835psi. Review logs with Harry Haywood in ANC & tie-into Geology PDC tog. Subtract 16' from CTD. 11:55 - 12:15 0.33 WHIP P WEXIT RBIH to 18257.53' & position TOWS ~ 18240'. P/U to up wt ~ 18249.6' to eliminate CT slack. 12:15 - 12:35 0.33 WHIP P WEXIT Check TF - ~ 65L. Orient 1 click to 54L. Orient 1 click to 42L. Orient 1 click to 37L. Orient 1 click to 31 L. Orient 1 click Printed: 5/8/2006 11:56:25 AAA BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code' NPT Phase Description of Operations 4/17/2006 12:15 - 12:35 0.33 WHIP P WEXIT to 20L. 12:35 - 12:50 0.25 WHIP P WEXIT Circ ~ 2.50/2.18bpm & 4300 psi for 4mins to arm the FAIV. Drop pump to Obpm. Wait 4mins. Bring on pump to 1.6bpm, & did not shear off WS. Continue pumping & observe TF of 9L. 12:50 - 13:10 0.33 WHIP P WEXIT Repeat process. Circ ~ 2.57/2.19bpm & 4400 psi for 4mins to arm the FAIV. Trip pumps 3x ~ 2.7bpm/4900psi. Drop pump to Obpm. Wait Smins. Bring on pump to 1.6bpm, & did not shear off WS. Continue pumping & observe TF of SR. 13:10 - 13:45 0.58 WHIP P WEXIT Orient TF around to 20L. Meanwhile call for cement truck & double-slick brine to set WS. 13:45 - 14:30 0.75 WHIP N WAIT WEXIT W.O. cement truck and/or double-slick brine to set WS. 14:30 - 15:30 1.00 WHIP N WEXIT Fill coil with double-slick brine & observe 300psi drop in CTP. Meanwhile R/U SLB cementers & hold PJSM for possible hi-pressure pumping. By-pass MM-in. 15:30 - 15:35 0.08 WHIP N WEXIT P/test cmt lines to 6000psi - OK. 15:35 - 16:00 0.42 WHIP P WEXIT Isolate rig pumps. Circ with cmt pump ~ 3.32/2.45bpm & 5400 psi for 4mins to arm the FAIV. Drop pump to Obpm. Wait 6mins. Isolate cmt pump. Line-up MM-in. Bring on rig pump to 1.6bpm, pressure up & shear off WS ~ 3100psi. Continue pumping & observe TF of 3R. S/D pumps. Set down 2k f~ 18258.7' - WS held. Vac out cmt lines. 16:00 - 19:35 3.58 WHIP P WEXIT POOH WS setting BHA#2 filling the hole via the CT ~ 0.95bpm/560psi. Paint EOP flag Q 18000'. 19:35 - 20:15 0.67 WHIP P WEXIT POH w/ BHA #2, LD MWD tools and WS setting tool 20:15 - 20:25 0.17 PXA P WEXIT PU cementing BHA #3 20:25 -00:00 3.58 PXA P WEXIT RIH w/ cementing BHA #3, tagged WS at 18240', PU to 18200' 4/18/2006 00:00 - 00:15 0.25 PXA P WEXIT Establish Injection Rates w/ 9.4 ppg brine at .58 bpm - 320 psi, 1.07 bpm - 392 psi, 1.6 bpm - 460 psi, 2.05 bpm - 494 psi, 2.53 bpm - 505 psi, 3.10 bpm - 546 psi, RU cementers, PVT - 256 bbls, IA - 925 psi, OA - 161 psi 00:15 -00:30 0.25 PXA P WEXIT PJSM on cement job 00:30 - 02:25 1.92 PXA P WEXIT Pump cement job as follows: pumped 5 bbls of FW, test lines to 4000 psi, 37 bbls of 15.8 ppg CL "G" neat cement slurry at 2.5 - 1.75 bpm, 2175 -800 psi, displace cement w/ 4.5 bbls of FW, shut in well at choke, switch over to rig pumps, pump 9.4 ppg 2 ppb biozan brine, bullhead into formation at 2.39 bpm - 350 psi, pressure increased to 415 psi after 33 bbls pumped, slowed rate to 1.25 bpm w/ 300 - 250 psi, pressure increased to 750 psi w/ 56 bbls pumped, open choke maintaining 750 psi WHP, POH, laying in remaining cmt 1:1, pumped 85 bbls. OOH at 16177' w/ Est TOC at -16645' 02:25 - 03:10 0.75 PXA P WEXIT Circ while holding squeeze pressure of 1250 psi at .41 bpm in/out, 1000 psi over inj WHP, monitoring iNout volumes, PVT at 298 bbls, IA at 2150 psi, OA at 325 psi 03:10 - 04:30 1.33 PXA P WEXIT Pump 9.4 KCLMACL ppg w/ 2 ppb biozan, RIH, washing down to 18240' w / 2.60 bpm 2100 psi, 500psi WHP, 1:1 retums, released WHP, opened choke 04:30 - 04:50 0.33 PXA P WEXIT PUH to 17000' while pumping at 2.25 bpm, 1350 psi w/ 1:1 retums 04:50 - 05:20 0.50 PXA P WEXIT RIH, washing down w/ 9.4 ppg Brine w/ 2 ppb Biozan to 18240' at 2.73/ 3.00 bpm 2289 psi, 1:1 retums 05:20 - 08:00 2.67 PXA P WEXIT POH to BHA while pumping at 2.85 bpm, 2550 psi w/ 1:1 retums w/ cement contaminated brine, Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 4 of 14 ..Operations :Summary Reporf Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/18/2006 08:00 - 09:30 1.50 PXA N WAIT WEXIT Pit levels low. Park bit ~ 9000' & W.O. additional bio-brine to arrive onsite. 09:30 - 11:00 1.50 PXA P WEXIT Continue POOH nozzle BHA circ out dirty fluid. 11:00 - 11:15 0.25 PXA P WEXIT OOH. S/B injector& UD nozzle BHA. 11:15 - 11:30 0.25 PXA P WEXIT M/U swizzle stick. Stab on injector & jet BOP stack. Flush surface lines. S/B injector & UD swizzle stick. 11:30 - 12:00 0.50 STWHIP P WEXIT M/U window milling BHA #4 with a 3.80" HC DP0261 DWM, 3.79" diamond string reamer, Baker Xtreme motor, MHA & 2 jts of PH6 tbg (OAL -84.70'). M/U injector. 12:00 - 16:10 4.17 STWHIP P WEXIT RIH window milling BHA #4,. correct back to EOP at 18000' w/ -13.6' correct, RIH to 18223', up wt 62 k, do wt 5 k, FS 1850 psi at 2.7 bpm, PVT 260 bbls 16:10 - 16:30 0.33 STWHIP P WEXIT Dlg cmt f/ 18223' - 18233' w/ 2.68 bpm, 2125 psi. PU to 18215', est FS w/ 2.69 bpm 1690 psi, RBIH, Drlg cmt f/ 18233' - 18244' 16:30 - 00:00 7.50 STW HIP P WEXIT Tag and stall .Mill window per time schedule 2.74/2.78 BPM ~ 1975 psi. -(1-2) K surface wt while milling. Mill to 18248.8 .Up Wt 58K,2.7 bpm 2234 psi, FS = 2100 psi. Retag at 18245'. 4/19J2006 00:00 - 01:00 1.00 STWHIP P WEXIT Continue attempting to mill getting motor work but no drill off. Decided to POH to check BHA. 01:00-05:00 4.00 STWHIP N DPRB WEXIT POH. 05:00 - 05:30 0.50 STWHIP N DPRB WEXIT LD milling BHA #1 and PU new mill and motor. 05:30 - 10:30 5.00 STWHIP N DPRB WEXIT Consult w/ Anchorage office and Baker, decided to run a 3.70" Crayola Mitl, wait on mill from Baker, C/O motor while waiting on mill 10;30 - 10:40 0.17 STWHIP N DPRB WEXIT MU 3.70" Crayola Mill to BHA #5 10:40 - 14:20 3.67 STWHIP N DPRB WEXIT RIH w/ Crayola Mill BHA to 18245', correction on btm -14.4', PU Wt 60 K, SO Wt 10.5 K at 18000', FS 2850 psi at 2.71 bpm, PVT 252 bbls, IA - 1168 psi, OA 189 psi, Note: crew performed and reviewed parted pipe drill. 14:20 - 17:00 2.67 STWHIP N DPRB WEXIT Attempt to Milling at 18245', 2.71 bpm w/ 3018 psi, UP Wt 60 K, Dn Wt 4.4 K, several stalls, time milling at 18243', no progress made 17:00 -20:30 3.50 STWHIP N DPRB WEXIT POH to BHA 20:30 - 21:00 0.50 STWHIP N DPRB WEXIT Replace cutrite Crayola mill with diamond speed mill w/o string mill. Crayola mill had no noticable wear but the bit box on the motor was polished. This new assy will put the bit box 6.5" deaper in well moving the contact area to the motor housing. 21:00-00:00 3.00 STWHIP N DPRB WEXIT RIH 4/20/2006 00:00 -00:15 0.25 STWHIP N DPRB WEXIT RIH tag at 18267.4 un corrected 00:15 - 01:00 0.75 STWHIP N DPRB WEXIT PU RIH tag 18258 uncorrected seeing motor work. 2.66/2.7 bpm ~? 3135 psi, 2800 psi FS. Time milled to 18259. RIH. Stall 18261.1 PU 6K over pull. Stuck! attempting to go up but able to go down OK. Pulled 20K over. Popped free. 7emporaraly dragging junk 10-15'. Call Town decided to POH for memory log and second WS. 01:00-04:30 3.50 STWHIP N DPRB WEXIT POH 04:30 - 04:50 0.33 STWHIP N DPRB WEXIT LD motor and mill. Mill in new condition. The mill shank, bit box and 2+" of the motor housing had serial gouges. 04:45 - 10:15 5.50 STWHIP N DPRB WEXIT Wait on Memory CCUGR Logger. Performed Rig Evacuation Drill Printetf: 5/8/2006 11:56:25 AM BP EXPLORATION Page 5 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code. NPT Phase` Description of Operations 4/20/2006 04:45-10:15 5.50 STWHIP N DPRB WEXIT 10:15 - 10:30 0.25 STWHIP N DPRB WEXIT Held PJSM on RU and Handling procedures on logging tools 10:30 - 11:00 0.50 STWHiP N DPRB WEXIT MU Memory GR-CCL w/ nozzle, 1 jt -2 3/8" PH6 tbg, MHA = 60.69' 11:00 - 14:00 3.00 STWHIP N DPRB WEXIT RIH w/ Logging BHA to 17500' 14:00 - 14:40 0.67 STWHIP N DPRB WEXIT Log do f/ 17500 to btm at 18269.5' at 30 fpm, .25 bpm, depth uncorrected, Painted EOP flag at 18208' 14:40 - 15:10 0.50 STWHIP N DPRB WEXIT Log up f/ 18269.5' to 17500' at 30 fpm, .25 bpm 15:10 - 17:00 1.83 STWHIP N DPRB WEXIT POH to BHA 17:00 - 21:00 4.00 STWHIP N DPRB WEXIT LD memory tools. Unable to read data files. 21:00 -00:00 3.00 STWHIP N DPRB WEXIT Send for replacement interface box from SLb at Nordic2. Unable to down load. Appears the internal battery failed. Will change out memory sonde and rerun log. 4/21/2006 00:00 - 00:15 0.25 STWHIP N DPRB WEXIT MU Memory Tool for run #2. 00:15 - 03:15 3.00 STWHIP N DPRB WEXIT RIH to 17500'. 03:15 - 03:45 0.50 STWHIP N DPRB WEXIT Log down to top of flag EOP 18208'. ~ 30 ft/min. Dn WT 8K. Tag TD up to get wt back 58K. 03:45 - 04:15 0.50 STWHIP N DPRB WEXIT Log up at 30 fUmin. to 17500. Paint Flag at 17400 EOP. 04:15 - 07:40 3.42 STWHIP N DPRB WEXIT POH to BHA 07:40 - 08:40 1.00 STWHIP N DPRB WEXIT POH w/ BHA, LD Memory GR-CCL tools, download tool, no GR detection, was able to correlate CCL to a jewelry log "SLB Production Profile" dated 7-Jun-2001 08:40 - 09:10 0.50 STWHIP N DPRB WEXIT MU 6.101" DB Underreamer, 2 jts of 2 3/8" PH6 tbg, and MHA, Stab Inj, BHA Length = 87.72' 09:10 - 13:00 3.83 STWHIP N DPRB WEXIT RIH w/ Underreamer BHA, correction at EOP -4.3', Rlh to 18000', PU, verified Tbg Tail at 17987', RIH to 18163', Up Wt 58 k, Dn Wt 5.3 k, PVT 235 bbls 13:00 - 15:00 2.00 STWHIP N DPRB WEXIT Underreaming f/ 18163' - 18233', 2.70 bpm w/ 3175 psi, first sign of mtr work at 18168', mtr stalled, continued underreaming to 18233.4', mtr stalled, attempt to work past for last 45 minutes, no progress 15:00 - 15:10 0.17 STWHIP N DPRB WEXIT Shut down pumps, collaspe underreamer blades, PU to 18200', RIH past 18233.4', noticed slight 1k bobble, RIH to 18255.8', taking weight, PU to 18185', had 4 k overpull , RIH to 18235' 15:10 - 15:20 0.17 STWHIP N DPRB WEXIT Backream f/ 18235' w/ 1.61bpm at 3300 psi, PUH to PU Wt, blades fully extended pressure fell off. 15:20 - 18:00 2.67 STWHIP N DPRB WEXIT RIH to 18233', underreaming f/ 18233' - 18240' w/ 2.74 bpm at 3425 psi, ROP at 6 fph, periodically stalling 18:00 - 22:15 4.25 STWHIP N DPRB WEXIT Continue reaming 2.7 / 2.7 bpm 3380 psi, FS = 3000 psi. 2-3K WOB. ROP 6 ft/hr. Periodic stalling. Ream to 18242.8. Pressure increasing 3340 spi ~ 2.4 bpm. RIH w/o pump tag at 18248'. 22:15 -00:00 1.75 STWHIP N DPRB WEXIT PU to17960 thru tail pipe with out pump knives closed went thru tailpipe no problem. Restablish FS at 2.7 bpm ~ 3010 psi. Pressure back to norrnal. RIH Underream 2.7 bpm ~ 3350psi frequent stalling slow ROP. 4/22/2006 00:00 - 06:00 6.00 STWHIP N DPRB WEXIT Continue underreaming 3460 psi ~ 2.74 bpm , FS=3300 psi. Numerous hard stalls. PU and RIH w/o pump tag at 18248. Resume underreaming 2.6 bpm 3040 psi. ream to 18249. ROP 1 ft/hr. 06:00 - 09:50 3.83 STWHIP N DPRB WEXIT Underreaming f/ 18249' to 18251' w/ 2.6 bpm 3040 psi. Limited progress since 07:30 hr, continued w/ several hard stalls. Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 6 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 ....Date From - To Hours Task Code NPT Phase Description of Operations 4/22/2006 09:50 - 10:30 0.67 STWHIP N DPRB WEXIT Drop 3/4" steel ball, Clrc ball down w/ 9.0 ppg double slick brine, open circ sub 10:30 - 14:00 3.50 STWHIP N DPRB WEXIT POH to BHA while displacing well to 9.0 ppg double slick 2% KCUNaCL brine 14:00 - 14:15 0.25 STWHIP N DPRB WEXIT POH w/ BHA, LD mill, underreamer, mtr, MHA, underreamer under gauged. Arms gaged 5" in shop. 14:15 - 15:30 1.25 BOPSU N DPRB WEXIT Blow back CT, Function Test BOPe's, Rig electrician Troubleshoot SCR's, pump rate and pressure still fluctuate sporadically while circ 15:30 - 16:30 1.00 STWHIP N DPRB WEXIT Cut off CTC, Cut 200' of CT, Install Baker CTC, pull and pressure tested 16:30 - 17:00 0.50 STWHIP N DPRB WEXIT PJSM on handling logging tools, load pipeshed with tools 17:00 - 17:40 0.67 STWHIP N DPRB WEXIT MU caliper-ccl-gr tools, 2 jts of 2 3/8" PH6, and MHA = 98.6' 17:40 - 20:28 2.80 STWHIP N DPRB WEXIT RIH w/ Caliper-CCL-GR BHA. RIH to 17500'. 105 ft/min. 20:28 - 21:00 0.53 STWHIP N DPRB WEXIT Log down from 17500 to TD at 40 fUmin. Need to be on bottom 20:50 at which time the caliper arms are timed to open. RIH 42 fUmin. Stop 18258 20:50HRS. 21:00 - 21:25 0.42 STWHIP N DPRB WEXIT Log up 50 ft/min. Caliper arms programmed to close at 21:13 hrs. ~ 17500'.STOPPED. Flag EOP 17400'. 21:25 - 00:00 2.58 STWHIP N DPRB WEXIT POH. 4/23/2006 00:00 - 01:00 1.00 STWHIP N DPRB WEXIT Continue to POH. 01:00 - 01:30 0.50 STWHIP N DPRB WEXIT LD BHA 01:30 - 04:30 3.00 STWHIP N DPRB WEXIT Process log data. Determine TD G~ 18242 corrected. Caliper log data somewhat compromised approximately 1/3 of the arms (lowside) were prevented from opening due to debris (metal filings). However suffient data exists over a consistent 170 degree interval that suggest we have full gauge casing at 18233 slip setting interval placing top of WS at 18216. The under gage under reamer blades are explainable based on the extremely hard reaming the last 11' taking 15.8 hours. Consult with anch Engr agreed to set second WS. 04:30 - 05:30 1.00 STWHIP N DPRB WEXIT MU second WS BHA == 71.43' 05:30 - 06:40 1.17 STWHIP N DPRB WEXIT Wait on arrival of RA tags. 06:40 - 07:00 0.33 STWHIP N DPRB WEXIT PJSM installing RA tags, Installed 2 RA tags 10' down from top of WS 07:00 - 11:25 4.42 STWHIP N DPRB WEXIT RIH w! WS Assy to 18180', EOP Fiag correction of -12.1' 11:25 - 12:30 1.08 STWHIP N DPRB WEXIT Log do f/ 18180' at 60fph w/ 1.63 bpm at 1703 psi, tie-in to Geology PDC log for WS setting depth, correction of -13', PU Wt 58K, SO Wt 8K, Position btm of WS at 18233', top of WS at 18216.5' 12:30 - 13:40 1.17 STWHIP N DPRB WEXIT Cycle pumps to oreint WS, Repair gasket rubber on steel line, cycle pumps, oriented to 29 LOH, cycle pump for last position to 4900 psi, bled pressure down to 0 psi, pressured up to 3300 psi, pressure dropped off to 2200 psi, set WS at 18216.5', 12 LH, verified WS was set by stacking 2 K S/O wt , WS set at 18233' 13:40 - 16:25 2.75 STWHIP N DPRB WEXIT POH to BHA 16:25 - 17:05 0.67 STWHIP N DPRB WEXIT POH w/ BHA, LD MWD tools, Baker RR 17:05 - 17:15 0.17 STWHIP N DPRB WEXIT MU cmt Houle assy = 9.85' 17:15 -20:30 3.25 STWHIP N DPRB WEXIT RIH w/ cmt nozzle assy. tag at 18241corrected to 18221. 20:30 - 21:00 0.50 STWHIP N DPRB WEXIT PJSM for cement job. Jet Whipstock 3.8 bpm ~ 3650 psi, while RU cementers. 21:00 - 21:50 0.83 STWHIP N DPRB WEXIT Pump 3 BBL H2O. PT to 4000 psi OK.Pump 8.3 bbl 15.8 Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 7 of 14' Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations. 4/23/2006 21:00 - 21:50 0.83 STWHIP N DPRB WEXIT cement and 3 bbl H2O. Shut down and swap to rig pump. Displace with KCL 3.46 / 3.46 bpm ~ 2900 psi. PT 301 bbl. Lay in cement 1:1. PU to 17750. 21:50 - 22:30 0.67 STWHIP N DPRB WEXIT Pressure to 1000 psi IA rose to 1800 psi from 850 psi. Shut in and hold for 30 min. Lost 55 psi in 30 min. 22:30 - 23:30 1.00 STWHIP N DPRB WEXIT Pump 32 bbl 2# bio and wash down to pinch point at 27 fpm, circulating 3 bpm ~ 2220 psi. PT 301 bbl 23:30 - 00:00 0.50 STWHIP N DPRB WEXIT POH 4/24/2006 00:00 - 02:45 2.75 STWHIP N DPRB WEXIT Continue to POH. 02:45 - 03:30 0.75 STWHIP N DPRB WEXIT PU nozzel and jet stack. 03:30 - 04:00 0.50 STWHIP N DPRB WEXIT MU Milling BHA. 04:00 - 07:30 3.50 STWHIP N DPRB WEXIT RIH with window milling BHA, tagged WS at 18238' uncorrected, PU WT 58k, SO Wt 6k, Pump rate at 2.75 bpm w/ 1630 psi, corrected depth to top of WS at 18215.5, offloaded 200 bbls of 9.0 ppg double slick brine w/ 2 ppb Biozan in pits 07:30 - 11:10 3.67 STWHIP P WEXIT Est Pinch point 18219', Tag and stall window mill at pinch point 2x's, Time milled window f/ 18219' - 18226' w/ 2.66 BPM ~ 1625 psi, WOM - 0-1 K milling window, drill formation f/ 18226' - 18237', 1-2 K drilling formation, Up Wt 58K, 2.7 bpm 1850 psi FS 11:10 - 12:45 1.58 STWHIP P WEXIT Wash and ream f/ 18237' thru window and 7" csg in tbg tail to 17900', several times at 2.7 bpm 1480 psi, no problems. Btms up sample confirm formation sand, metal and scale particals in returns, recovered very little metal thru out window milling operations, a few strands over the shakers and attached to magnets. 12:45 - 16:00 3.25 STWHIP P WEXIT POH to Milling BHA 16:00 - 16:45 0.75 STWHIP P WEXIT POH LO Milling BHA, MHA, starter mill slightly undergaged f/ 3.80" to 3.79" 16:45 - 18:00 1.25 DRILL P PROD1 MU Drlg BHA w/ Baker 33/4" x 4 1/8" BiCenter Bft, 2.7 deg mtr, MWD-GR, SLB MHA, C/O to SLB CTC, Pull and pressure test, stab injector 18:00 - 22:00 4.00 DRILL P PROD1 RIH. 22:00 -00:00 2.00 DRILL N RREP PROD1 Shut down to repair SCR replaced Generator Mother Board. 4/25/2006 00:00 - 00:40 0.67 DRILL P PROD1 Orient to 52L 00:40 - 02:30 1.83 DRILL P PROD1 RIH Tag at 18261 and correct to 18239. Direcrionally drill 2.75 / 2.75 BPM at 2549 psi. While snapping to Flo Pro.21. Circulation pressure with new FloPro at bit =3550 psi ~ 2.63 bpm. 02:30 - 05:00 2.50 DRILL P PROD1 Attempt to orient. Unable to orient on or off bottom. Fluid interface came back 150 bbl Iate.Swapping IA fluids due to leaking tubing. !A volume 960 bbls. Circulating pressure when FtoPro back to surface = psi, 05:00 -06:30 1.50 GRILL P PROD1 PU above window to 18140', orient TF around to 170L, RIH to btm, TF at 15R, want TF at 90 L, PU to 18228', orient. around to 114L, RIH to btm, TF at 86L 06:30 -06:45 0.25 DRILL P PROD1 Directionally drill 2.3712.10 BPM at 3450 psi, TF at 86L, FS 3100 psi, PVT 157 bbls, IA 1454 psi, OA 315 psi, TF rolled to 56 L 06:45 - 07:05 0.33 DRILL P PROD1 PU to 18228', Orient TF around to 165 R, RIH to btm, TF at 100 L 07:05 - 09:10 2.08 DRILL P PROD1 Directionally drill 2.44 / 1.85 BPM at 3750 psi, TF at 100 - 80 L, PVT 147 bbls, IA 1447 psi, OA 325 psi 09:10 - 09:35 0.42 DRILL P PROD1 PU to 18228', Orient around to 159 L, RIH to Btm , TF at 86 L Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/25/2006 09:35 - 09:45 0.17 DRILL P PROD1 Directionally drill 2.44 / 1.95 BPM at 3750 psi, TF at 90 L, PVT 147 bbls, IA 1447 psi, OA 325 psi, PVT 119 bbls, Offloading Vac Trk w/ 290 bbls of 9.0 ppg Flo-Pro mud into pits 09:45 - 09:55 0.17 DRILL P PROD1 PU to 18228', Oriented 1 click f/ 170 L to 142 L, RIH to btm, TF 75 L 09:55 - 11:00 1.08 DRILL P PROD1 Drlg w/ 2.55/2.26 bpm, 3600 - 3900 psi, TF 75 - 80 L, PVT 285 bbls, IA 1450 psi, OA 315 psi, ROP 115 fph, losing - 30 BPH to well 11:00 - 11:15 0.25 DRILL P PROD1 POH to 18200', run tie-in pass to RA tag 11:15 - 12:45 1.50 DRILL P PROD1 Tie-in pass f/ 18200' 12:45 - 15:30 2.75 DRILL P PROD1 POH 15:30 - 17:45 2.25 DRILL P PROD1 LD build assembly and PU 1.2 degree lateral assembly with restivity tool. 17:45 - 18:15 0.50 DRILL P PROD1 RIH to 1900' Shallow hole test . Orienter failed. 18:15 - 18:40 0.42 DRILL N DFAL PROD1 POH Orienter failure. 18:40 - 19:20 0.67 DRILL N DFAL PROD1 C/O orienter, adjust motor to 1.0 deg and check scribe offset. OAL = 91.1'. 19:20 - 20:00 0.67 DRILL N DFAL PROD1 RIH with lateral MW D /RES BHA #15 with 1.0 deg motor and new HCC BC Bit. SHT orienter OK. 20:00 - 22:45 2.75 DRILL P PROD1 Continue RIH. Full returns. 22:45 - 00:00 1.25 DRILL P PRODi log GR tie-in above window at 18,160'. -23 ft CTD. 4/26/2006 00:00 - 00:30 0.50 DRILL P PROD1 RIH clean to bottom. Tag at 18,540'. 10 BPH mud loss on bottom. 2.8/2.6 BPM. 00:30 - 01:30 1.00 DRILL N DFAL PROD1 Attempt to log RES MAD pass from bottom up to window. No pulses below 18340'. Tool in a bind due to higher DLS in build section. 01:30 - 02:00 0.50 DRILL P PROD1 Drlt 10 ft blind to see if we can get pulses on bottom. Started getting pulses after 10'. Try to orient on bottom. No luck. 02:00 - 02:30 0.50 DRILL P PROD1 Pull to just below window and orient i 1 clicks. R1H to bottom. Had pulses all the way to bottom for the first time. 02:30 - 03:30 1.00 DRILL P PROD1 Drilled Lateral in Kuparuk sand, 2.5 / 2.2 bpm, 3600-4000 psi, 124L, 70 fph, 95 deg incl, Drilled to 18,610'. 03:30 - 03:40 0.17 DRILL P PROD1 Orient TF to 90L. 03:40 - 05:30 1.83 DRILL P PROD1 Drilled Lateral in Kuparuk sand, 2.5 / 2.2 bpm, 3600-4000 psi, 90L, 70 fph, 93 deg incl, Mud toss of 15 BPH. Drilled to 18,700'. 05:30 - 06:45 1.25 DRILL P PROD1 Log RES / GR MAD pass up to window, 300 FPH. 2.7 / 2.5 bpm, 3900 psi. 06:45 - 07:00 0.25 DRILL P PROD1 RIH 2.6/2.55 bpm ~ 3700 psi. 07:00 - 08:40 1.67 DRILL P PROD1 Directionally drill 2.56/2.32 bpm ~ 3770 psi .surface wt 7-SK. ROP 80 PT 228 ~ 07:00. Drill to 18850'. 08:40 - 10:10 1.50 DRILL P PROD1 Wiper to tailpipe. Orient 10R thru window. 2.55 bpm ~ 3560 psi.FS, RIH to 18842 and Orient to 95L. 10:10 - 12:30 2.33 DRILL P PR001 Directionally drill 2.66/2.42 bpm ~ 4200 psi . FS = 3600 psi. Surface wt 5-6K. ROP 119 PT 188 d 10:00. Drill to 19000'. 12:30 - 13:15 0.75 DRILL P PROD1 Wiper to window. 2.63 bpm ~ 3600 psi Up Wt 39K. DW Wt 8K. Add volume to pits. 13:15 - 14:45 1.50 DRILL P PROD1 PT =304. Directionally drill 2.58/2.44 bpm ~ 4100 psi . FS = 3600 psi. Surface wt 6-5 K. ROP 123. 105L. Drill to 19150'.Loss rate 8 bbl /hr. 14:45 - 15:20 0.58 DRILL P PROD1 Wiper to window to 18310'. 15:20 - 16:00 0.67 DRILL P PROD1 Tie-in Correction +7' Printed: 5/8/2006 11:58:25 AM BP EXPLORATION Page'9 of 14: Operations Summary Report Legal Wetl Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4h 0/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours `Task Code NPT Phase Description of Operations 4/26/2006 16:00 - 16:30 0.50 DRILL P PROD1 RIH to 19150'. 16:30 - 18:00 1.50 DRILL P PROD1 PT = 280 Orient 80R .Directionally drill 2.63/2.44 bpm ~ 4100 psi . FS = 3600 psi. Surface wt 6 K. ROP 101. Fluid loss of 8 BPH. Drilled to 19300'. 18:00 - 19:50 1.83 DRILL P PROD1 Wiper trip to tailpipe at 17,980'. Clean trip. RIH clean to bottom. 19:50 - 20:15 0.42 DRILL P PROD1 Orient TF to 80R. 20:15 - 22:30 2.25 .DRILL P PROD1 Drilled lateral, 2.5 / 2.3 bpm, 3500-4000 psi, 90R, 80 FPH, 8 bph fluid loss, 94 deg incl, Drilled to 19,450'. 22:30 - 23:50 1.33 DRILL P PROD1 Wiper trip to window. Clean trip. RIH clean to bottom. 2.7 bpm, 3950 psi. 23:50 - 00:00 0.17 DRILL P PROD1 Drilled lateral, 2.5 / 2.3 bpm, 3500-4000 psi, 100R, 90 FPH, 8 bph fluid loss, 93 deg incl, Drilled to 19,464'. 4/27/2006 00:00 - 01:20 1.33 DRILL P PROD1 Drilled lateral, 2.5 / 2.4 bpm, 3500-4000 psi, 110R, 92 deg incl, 100 fph, stacking full wt. New FloPro is ordered. Drilled to 19563'. 01:20 - 01:30 0.17 DRILL P PROD1 Orient TF to 150L. 01:30 - 02:00 0.50 DRILL P PROD1 Drilled lateral, 2.5 / 2.4 bpm, 3500-4000 psi, 130L, 93 deg incl, 100 fph, stacking full wt. Drilled to 19,600'. 02:00 - 02:45 0.75 DRILL P PROD1 Wiper trip to window. Clean trip. 02:45 - 03:15 0.50 DRILL P PROD1 Log GR tie-in at window. Added 11 ft to CTD. 03:15 - 04:00 0.75 DRILL P PROD1 RIH clean to bottom. Tagged at 19604'. 04:00 - 04:15 0.25 DRILL P PROD1 Drilled lateral, 2.4 / 2.4 bpm, 3600-4200 psi,. 80L, 90 deg incl, 100 fph, stacking full wt. Drilled to 19,636'. 04:15 - 04:45 0.50 DRILL P PROD1 Orient TF around to 110L. 04:45 - 06:30 1.75 DRILL P PROD1 Drilled lateral, 2.4 / 2.4 bpm, 3600-4200 psi, t00L, 90 deg incl, 100 fph, stacking full wt. Drilled to 19,750'. 06:30 - 08:30 2.00 DRILL P PROD1 Wiper trip to tailpipe. Begin mud swap. 08:30 - 12:30 4.00 DRILL P PROD1 Directionally drill 2.53 / 2.54 blm ~ 4000 psi. FS = 3700 psi. Reactive torque erradic 20 to 180 degrees making orienting difficult. Continue drilling 2.47 / 2.39 bpm 4000 psi. NOTE the interface on the mud swap once again arrived 150+ bbl late. Effectively 2800' of the IA is part of the active system due to extensive holes in tubing. 12:30 - 14:10 1.67 DRILL P PROD1 Wiper to window. Clean trip. 14:10 - 14:30 0.33 DRILL P PROD1 Orient 134E 14:30 - 18:15 3.75 DRILL P PROD1 Directionally drill 2.5012.40 bpm ~ 3875 psi. FS = 3700 psi. Surface wt 3K.ROP 80. formation change?? at 19980 shift in restivity. Continue to drill to 20050'. having some difficulty sliding. 18:15 - 19:15 1.00 DRILL P PROD? Wiper to TP. Clean hole. Full returns. 19:15 - 20:00 0.75 DRILL P PROD1 Log GR tie-in at window. 33K up wt. Added 15' CTD. 20:00 - 21:00 1.00 DRILL P PRODi RIH clean to bottom. Tag bottom at 20,058'. 21:00 - 23:00 2.00 DRILL P PROD1 Drilled lateral, 2.5/2.5 bpm, 3600-4100 psi, 120L, 81 deg incl, not sliding, stacking wt, more stalls. Not able to drill further. Drilled to 20,098'. 23:00 - 23:40 0.67 DRILL P PROD1 Short wiper trip up to 19,700' while circulating new FbPro to bit. See if we can drill with new FloPro in open hole for better slide. Coil capacity = 84 bbls. Down wt off bottom = 7K. Up wt = 39K. 23:40 - 23:55 0.25 DRILL P PROD1 Drilled with new mud in open hole. 2.5 / 2.5 bpm, 3600-4100 psi, Still not sliding. Several stalls. Drilled to 20,100'. Wearing out coil with many stalls. Printed: 5/8/2006 11:x:25 AM BP EXPLORATION Page ~ 0 of ~ 4 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From.- To` Hours Task Code NPT Phase Description of Operations 4/27/2006 23:55 -00:00 0.08 DRILL P PROD1 POH to check BHA and pick up agitator. 4/28/2006 00:00 - 04:10 4.17 DRILL P PROD1 POH to check BHA. Pump all the way to surface. 04:10 - 06:00 1.83 DRILL P PROD1 L/O BHA. Bit was gradded at 1,4,1. Download RES data. 06:00 - 11:30 5.50 BOPSU P PROD1 Pressure /function test ROPE. 14 day test. No failures. Send Test report to AOGCC. Witnessed By Bob Laule BP Well Site supervisor. Witnessing waived by AOGCC 's Lou Gramaldi. 11:30 - 13:30 2.00 DRILL P PROD1 Prep and install Baker coil connector. Pull test and Pressure test. PT inner reel valve. 13:30 - 16:00 2.50 DRILL P PROD1 MU BHA ldegree motor, MWD, Restivity, with agitator and 4 joints PH6. BHA = 221.34' 16:00 - 19:20 3.33 DRILL P PROD1 RIH. Shallow hole test at 2000'. O.K. RIH. 19:20 - 19:50 0.50 DRILL P PROD1 Log GR tie-in above window. -25' CTD. 19:50 - 20:40 0.83 DRILL P PROD1 RIH clean to bottom. Tag at 20,101'. 20:40 - 21:00 0.33 DRILL P PROD1 Orient TF to 120L. 21:00 - 22:30 1.50 DRILL P PROD1 Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3800-4200 psi, 135L, 81 deg incl, 50 fph, Good wt transfer with agitator, higher pump press, drilling with +5K injecter wt. Drilled to 20140'. 22:30 - 00:00 1.50 DRILL P PROD1 Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3800-4200 psi, 135L, 80 deg incl, 50 fph, drilling with +5K injecter wt. Drilled to 20,198'. 4/29/2006 00:00 - 01:15 1.25 DRILL P PROD1 Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3600-4300 psi, 78 deg incl, 40 fph, Drilled to 20,220'. Stacking wt. 01:15 - 03:15 2.00 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 03:15 - 03:45 0.50 DRILL P PROD1 Orient TF to right side. 03:45 - 05:00 1.25 DRILL P PROD1 Drilled lateral in Kuparuk sand, 2.3 / 2.3 bpm, 3700-4300 psi, 160R, 77 deg incl, 20 fph, Stacking wt, several stalls, Very slow progress. Drilled to 20,245'. 05:00 - 06:30 1.50 DRILL P PROD1 Trying to drill ahead. Pump 70 bbls new FloPro to bit, time drill at 20 fph, very little motor work, and light WOB, 2.3 / 2.3 bpm, 3700-4300 psi, 160R, 76 deg incl. Drilled to 20,270'. 06:30 - 06:45 0.25 DRILL P PROD? Orient 104R. 06:45 - 10:00 3.25 DRILL P PRODi Directionally drill 2.3212.32 bpm ~ 4130 psi. 6K surface wt, FS =3820 psi. Drill to 20320' 10:00 - 10:30 0.50 DRILL P PROD1 Orient to 57R. 10:30 - 12:10 1.67 DRILL P PROD1 Directionally drill 2.32/ 2.30 bpm ~ 4080 psi. Surface wt 8K,ROP 23,INC 68. 12:10 - 14:15 2.08 DRILL P PROD1 Wiper to tailpipe. 14:15 - 16:00 1.75 DRILL P PROD1 Directionally drill 2.25/ 2.25 bpm ~ 3900 psi. FS = 3720 psi. Surface wt SK,ROP 15-20, INC 67. Drilled to 20380'. Decided to POH to look at BHA. ROP decreasing with a step change at 20350'. Still good weight transfer 8K surface wt. Motor Stall wfth IitNe weight. 16:00 -20:00 4.00 DRILL P PROD1 POH, circ while POH to surface. 20:00 -00:00 4.00 DRILL P PROD1 Lay out BHA. Found motor was losing rubber, bit had 2 plugged ports, C/O motor and NUU new 1.0 Deg motor, re-run bR, found one very small pinhole in Sperry RES tool body [1/32"]. Download RES data. C/O RES tool. C/O BOT MHA. Press test CTC. 4/30/2006 00:00 -00:30 0.50 DRILL P PROD1 Continue with BHA swap. 00:30 - 04:00 3.50 DRILL P PROD1 RIH wkh Agitator /RES BHA with 1.0 deg motor to Tie-in point. 04:00 - 04:30 0.50 DRILL P PROD1 Tie-in correction -26.5.' 04:30 - 05:45 1.25 DRILL P PROD1 RIH and tag bottom at 20,354'. Printed: 5/8/2006 11:56:25 AM BP EXPLORATION Page 11' of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ` From - To Hours Task -Code NPT Phase Description of Operations 4/30/2006 05:45 - 06:00 0.25 DRILL P PROD1 Orient to 80R. 06:00 - 07:35 1.58 DRILL P PROD1 Directionally drill 2.3 bpm ~ 4100-3700 psi, FS = 3650. Drill to 20,432. PU to orient. Stuck at 20,425' 07:35 - 07:50 0.25 DRILL N STUC PROD1 Pull up to 76K, Slack off to -10K and shut down pump. wait. Call for crude. Work pipe and pop free. 07:50 - 08:15 0.42 DRILL P PROD1 Drill to 20,446' Pu to orient. Pull 65K. 08:15 - 08:25 0.17 DRILL P PROD1 Short wiper to 20,225'. 08:25 - 09:00 0.58 DRILL P PROD1 Directionally drill 2.27 / 2.25 bpm ~ 4025 psi, FS = 3850 psi., surface wt 7K, INC 71, Rop 25-35, drill to 20460'. 09:00 - 09:14 0.23 DRILL P PROD1 Orient to 84R. 09:14 - 11:25 2.18 DRILL P PROD1 Directionally drill 2.3 /2.3 bpm +~ 4080 psi, FS = 3800 psi, ROP 32-50 ,Surface wt 6-8K. Incl climbing to 72 deg. 11:25 - 11:30 0.08 DRILL P PRODi Orient to 1698. 11:30 - 13:00 1.50 DRILL P PROD1 Directionally drill to 20,538. Short wiper set down at 20,474. Will drill to 20560 per Geo request to get gamma across fast drilling zone ~ 20,500 prior to wiper. Stacking weight. Drill to 20541. Made short wipe. Stacking at 20,478 and beyond. Discuss with Anchorage target sand 2FS not present. Will Stop attempting to work to bottom and make MAD pass while awaiting on orders. 13:00 - 16:00 3.00 DRILL P PROD1 Log MAD pass to window. Tie in correction = +7'. 16:00 - 16:30 0.50 DRILL P PROD1 RIH .Stop RIH, did not tag TD. Anchorage Stopped any further action on this sidetrack. 16:30 - 20:00 3.50 DRILL P PROD1 POH. Recieve orders to open hole sidetrack at 19,160' while POH. 20:00 - 22:00 2.00 DRILL P PROD1 Lay out Agitator! RES BHA. Download RES data. Bit grad = 1-3-1. 2 plugged ports. 22:00 - 23:45 1.75 STKOH C PROD1 Cut off 400' coil for coil fatigue management at window depth. 23:45 -00:00 0.25 STKOH C PROD1 M/U SWS CTC. Pull /press test CTC. 5/1/2006 00;00 -00:15 0.25 STKOH C PROD1 M/U SWS CTC. Pull /press test CTC. 00:15 - 01:15 1.00 STKOH C PROD1 M/U Open hole sidetrack BHA with 2.0 deg motor and Used HCC Sidetrack bit #8 with brass guide. 01:15 - 04:30 3.25 STKOH C PROD1 RIH with BHA #18. SHT tools - OK. RIH with no pump. 04:30 - 04:45 0.25 STKOH C PROD1 Log down at 18,185' and tie-in with GR. -25' CTD correction. 04:45 - 05:15 0.50 STKOH C PROD1 RIH clean thru window with 60L TF. Set down in build section, which shows the guide has worked off. Continue to RIH to kick off depth of 19,160'. Flag coil at 19,160'. 05:15 - 05:45 0.50 STKOH C PROD1 Orient TF to 166L. Hole was drilled at 85R at 19,160'. 05:45 - 16:30 10.75 STKOH C PROD1 Backream trough from 19,160' up to 19,140'. 2.5/2.5 bpm, 3600 psi, 166E TF, 20 fph. 32.5K up wt. 3' for up /down depth difference. Trough down at 40'/hr, Trough up second pass at 20 ft/hr. Trough down second pass 40 ft/hr. Stop at 19159 and time drill 30 min. Time drill one ft/hr. Stacking. Can't get any motor work. Make third trough pass 20 ft/hr up and 40 ft/hr down. Time drill to 19167'. Slight motor work. 16:30 - 17:45 1.25 STKOH C PROD1 Orient to 138E and increase ROP to 10'/hr. Drill to 19173. Orient to 110L. Drill at 10 fU hr to 19176 orient to 71 L. Drill to 19179.Increase ROP to 17.Orient 65L Inclination at 19159 = 91.14 in the original well bore the inclination was at 92.6. Looks Good. Orient and drill to 19184 TF 31 L. ~ 40 ROP. Drill to 19190. 17:45 - 20:00 2.25 STKOH C PROD1 Back ream at 26L TF ~ 30 ft/hr from 19190 to 19135'. Set Primed: srerzoos t t:sszs ant BP EXPLORATION Page 12 of 14 Operations SummaryReport Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 `Date From - To Hours Task Code NPT Phase Description of Operations 5/1/2006 17:45 - 20:00 2.25 STKOH C PROD1 down while trying to RIH with no pump. 20:00 - 20:15 0.25 STKOH C PRODi Orient to lowside to RIH. 20:15 - 23:00 2.75 STKOH C PROD1 Ream down with lowside TF and tag bottom at 19,190'. Backream with lowside TF. Ream down again with LS TF, tag bottom at 19,190' Orient TF to 45R and backream up to 19,130'. 23:00 -00:00 1.00 STKOH C PROD1 POH for RES lateral BHA. 5/2/2006 00:00 - 02:15 2.25 STKOH C PROD1 POH with OH sidetrack BHA. 02:15 - 05:30 3.25 STKOH C PROD1 UO sidetrack BHA. Adjust motor to 1.2 deg. M/U re-run HCC bit #9, M/U MWD and RES tool and upload, M/U orienter and MHA. Cut off 2' coil. M/U new CTC. Pull /press test. 05:30 - 09:00 3.50 DRILL C PROD1 RIH with lateral MWD RES BHA #19 with 1.2 deg motor and re-run HCC bit#9. SHT Tools. RIH 18136'. 09:00 - 09:15 0.25 DRILL C PROD1 Orient 25L to exit window. RIH to 18325. 09:15 - 09:30 0.25 DRILL C PROD1 Tie - in. Correction = -32 09:30 - 10:00 0.50 DRILL C PROD1 RIH 25L. to 19206' entered old hole. Orient to 168L. Thru open hole sidetrack O.K. RIH .6 bpm 1860 psi. RIH tag 19193. 10:00 - 12:30 2.50 DRILL C PROD1 Orient to 5R. Directionally drill 2.45 /2.41 bpm at 3930 psi. injector wt 7K, ROP 87. Begin swap to new Flo Pro. Drilled to 19,300'. 12:30 - 13:15 0.75 DRILL C PROD1 Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 103 deg incl, 70R, Drilled to 19,350'. 13:15 - 14:15 1.00 DRILL C PROD1 Wiper trip to window. Clean hole. RIH. Tag bottom at 19,350'. 14:15 - 14:30 0.25 DRILL C PROD1 Orient TF to 100R. 14:30 - 15:15 0.75 DRILL C PROD1 Drilled lateral, 2.4 ! 2.4 bpm, 3400-4100 psi, 99 deg incl, 140R, Drilled to 19,420'. 15:15 - 15:30 0.25 DRILL C PROD1 Orient TF to 60R. 15:30 - 16:30 1.00 DRILL C PROD1 Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 101 deg incl, 80R, Drilled to 19,500'. 16:30 - 18:00 1.50 DRILL C PROD1 Wiper trip to window. Clean hole. RIH. 18:00 - 18:20 0.33 DRILL C PROD1 Orient TF to low side to run thru open hole sidetrack at 19,150'. 18:20 - 20:05 1.75 DRILL C PROD1 Drilled lateral, 2.4 / 2.4 bpm, 3400-4100 psi, 101 deg incl, 100R, Drilled to 19,607. Stacking wt. 20:05 - 20:50 0.75 DRILL C PROD1 Wiper trip clean to 18315'. 20:50 - 21:30 0.67 DRILL C PROD1 Log up GR & tie-into formation marker -add 7' to CTD. 21:30 - 22:35 1.08 DRILL C PROD1 RBIH clean to 19100'. Orient TF to 160E &RIH Glen ihru OHST pt. Continue RIH to btm. 22:35 - 22:45 0.17 DRILL C PROD1 Orient TF to 100R. Up wt = 35k. Run-in wt = 7k. IAP = 1430psi, OAP = 240psi. PVT = 290bb1s. 22:45 -00:00 1.25 DRILL C PROD1 Drill into hard spot ~ 19620' with 90-100R TF , 2.35/2.35bpm, 3300/3550psi, 16k WOB & -9k CT wt. Stacking wt without drilling thru hard spot. 5/3/2006 00:00 - 02:45 2.75 DRILL C PROD1 Grind on & pop thru hard spot. Drill to 19660' with 90R TF, 2.5/2.5bpm, 3500/3900psi, 16k WOB, -9k GT wt ~ 15fph ave ROP. See the HRZ base on GR log ~ +/-19612'. Geo call TD. 02:45 - 03:30 0.75 DRILL C PROD1 MAD pass OH ~ 14fpm from TD to 19050', 03:30 - 03:50 0.33 DRILL C PROD1 POOH drilling BHA to 18310'. 03:50 - 04:15 0.42 DRILL C PROD1 log up GR 8 tie-into formation marker -add 2' to CTD. 04:15 - 07:15 3.00 DRILL C PROD1 POOH drilling BHA #19. 07:15 -09:15 2.00 DRILL C PROD1 UO BHA and download RES tool. 09:15 - 10:30 t.25 DHB X WAIT POST Change in plan. Need to set plug in 4-1/2" tubing at 17,890'. Peened: sisnoos 11:5625 AM $P EXPLORATION Page 13 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 -Date From - To Hours Task Code NPT Phase Description of Operations 5/3/2006 09:15 - 10:30 1.25 DHB X WAIT POST Wait on tools. 10:30 - 11:00 0.50 DHB C POST HELD H2S RIG EVACUATION DRILL. All personnel accounted for. Reviewed each mans job asignments for drill. 11:00 - 11:15 0.25 DHB C POST SAFETY MEETING. Review procedure, hazards and mitigation for M/U BOT IBP BHA. 11:15 - 12:15 1.00 DHB C POST M/U BOT 3-3/8" IBP, running tools, 1 jt 2-3/8" PH6 tbg, check valve and CTC. OAL = 54.42'. 12:15 - 16:00 3.75 DHB C POST RIH with BOT IBP BHA. Circ at 0.4 bpm to place KCL at IBP once on bottom. Offload liner from pipe shed while RIH. 35K up wt at 17,900'. Subtract 25' CTD, which is average tie-in correction on last 5 trips. Position center of IBP at 17,885', bottom of IBP at 17,890'. Top of IBP at 17,879'. This places center IBP in center of first joint above "X" nipple. 16:00 - 20:00 4.00 DHB C POST Insert 1/2" AL ball and circ. on seat with KCL water. Pump 2.4 bpm, 2400 psi. Slow pump to 0.35 bpm, 210 psi, at 60 bbls. Ball on seat at 71.9 bbls, at 1715 hrs. Holding 360 psi. Let thermally stabilize for 3 hours, standard procedure for setting BOT IBP. 20:00 - 20:15 0.25 DHB C POST Line up & pump via the CT to set the IBP. Pump 0.2bbls of KCUNacI Brine ~ 0.2bpm to 750psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine ~ 0.2bpm to 1250psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine ~ 0.2bpm to 1950psi. S/D pump & hold pressue for 5mins. Pump 0.2bbls of KCUNacI Brine ~ 0.2bpm & shear from IBP ~ 2350psi. 20:15 - 20:20 0.08 DHB C POST PUH with Stool to 17865'. 20:20 - 21:45 1.42 DHB C POST Isolate CT. Line up & PJtest wellbore via the kill-line. Bring up WHP to 1000psi & observe +/-200psi pressure loss after shut-in. Repeat process several times till IAP stabilizes ~ 1800psi. P/test wellbore & IA as follows: Time WHP CTP OAP IAP Onset -15 200 73 1185 0 1033 355 145 1805 10 1011 355 143 1800 20 1000 355 138 1796 30 996 355 134 1792 _> Good test -Leaked 3.6% of test pressure in 30 mins. 21:45 -22:00 0.25 DHB C POST Start swapping well to 9ppg KCUNaCL brine. Pump out 100bb1s of brine. 22:00 -00:00 2.00 DHB C POST POOH with Stool to 5000' while swapping well to 9ppg KCUNaCL brine. 5/4/2006 00:00 -00:45 0.75 DHB C POST Continue POOH & start pumping down diesel FP fluid. 00:45 - 02:15 1.50 RIGD P POST POOH from 4100' freeze protecting wellbore with diesel. SI master & swab valves (22 turns each). Remove fuseable cap. 02:15 - 03:00 0.75 RIGD P POST OOH. PJSM. S/B injector. UD baker IBP STools. 03:00 - 03:15 0.25 RIGD P POST M/U swizzle stick. Stab on injector & jet BOP stack. Flush surface lines. Pump 5bbls of McOH. 03:15 - 03:25 0.17 RIGD P POST PJSM for B/D CT with N2. 03:25 - 03:30 0.08 RIGD P POST P!f N2 lines - OK. 03:30 - 05:15 1.75 RIGD P POST Blow down CT with N2 & bleed off. Meanwhile clean out pits & Printed: 5/6/2006 11:56:25 AM BP EXPLORATION Page 14 of 14 Operations Summary Report Legal Well Name: NK-14 Common Well Name: NK-14 Spud Date: Event Name: REENTER+COMPLETE Start: 4/10/2006 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT' Phase- Description of Operations 5/4/2006 03:30 - 05:15 1.75 RIGD P POST tanks. S/B injector & VD swizzle stick. 05:15 - 05:30 0.25 RIGD P POST Held PJSM for cutting 3090' of CT. 05:30 - 08:00 2.50 RIGD P POST R/U hydraulic cutter & cut 3,090' of CT. Cleaned out cuttings tank with supersucker. Moved trailers and Sperry / MI shacks to C pad. 08:00 - 10:00 2.00 RIGD P POST N/D BOPE, N/U tree cap and press test to 4,000 psi. RELEASED RIG AT 10:00 HRS, 05/04/2006 A TOTAL OF 19 DAYS, 9-1/2 HOURS FROM RIG ACCEPT TO RELEASE. All further DIMS information will be on C-34A dims. Prirrted: 5/8/2006 11:56:25 AM • ~, Y1 y7 ~ J~y .~, ;~ ~~'°' ~ ~ ' 1 ~ ~ ~ ] ~ ,'~? ~ ~ ~ ,~ ! ~ ~ ~ ~ ~ '-~ 1 ~ FRANK H. MURKOWSKI, GOVERNOR a' ~.~ls~c>•-7~~ ®iL ~ ua-7 '~ 333 W. 7r" AVENUE, SUITE 100 CO1~T5ERQA~`IO1~T COMhIISSIO~T a, ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Niakuk Oil Pool, PBU NK-14A Sundry Number: 306-161 Dear Mr. McLaughlin: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this day of May, 2006 Encl. '~L -~~ l ~~' S/~%~ cl~s-~-off ~'~°~ S/y~c~ ~ !~U~ ls~¢~~on4 STATE OF ALASKA 1~ ALASKA ~ AND GAS CONSERVATION CO ISSION .; 4k ~~ APPLICATION FOR SUNDRY APPR ~ ,., ~.: .,, . 20 AAC 25.280 ~,,~. ~.,,a;,r 1. Type of Request: ^ Abandon Q Suspend ®Operation Shutdown ^ Perforate ^ Other ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time Extension 2. Operator Name: 4. Current Weil Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development ^ Exploratory 206-031 ~ ress: ^ Stratigraphic ^ Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22668-01-00 7. KB Elevation (ft): 59 8, 9. Well Name and Number: PBU NK-14A ~ 8. Property Designation: 10. Field /Pool(s): ADL 034625 Prudhoe Bay Field / Niakuk Pool ~~~ PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 19660 9020 18219 9144 17930 None Casin Len th Size MD TVD Burst Colla se Structural Conductor 80' 20" 80' 80' 1530 520 Surface 6377' 13-3/8" 6417' 4518' 4930 2270 Intermediate 18083' 9-5/8" 18121' 9103' 6870 4760 Pro uc ion Liner 738' 7" 17962' - 18219' 9039' - 9144' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None ~ None 4-1/2", 12.6 NT-80 17982' Packers and SSSV Type: 9-5/8" x 4-1/2" TIW 'HBBP' packer Packers and SSSV MD (ft): 179 ' 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 14. Estimated Date for ~ 15. Well Status after proposed work: Commencing Operations: M 3 ~ 2006 ®Oil ^ Gas ^ Plugged ^ Abandoned 16. Verbal Approval: rnJK{~.1 v te: ~ ~ ~(; ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Re resentative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer Prepared By NamelNumber: ~ ~ ~ ' Terrie Hubble, 564-4628 Si nature ,~. Phone 564-4387 Date ~ OG Commission Use Onty Sundry Number: ~ .. Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: ~'~l" Vl~ ~~ d l'"~Y~.v~ ~ C~ ~~ ~ V'P.y k-t~ N-2 Q ~O Y'`.P~~~tir't r!-f7~at~4Gv~ Subsequent Form Required: ~ D t(~j ~~ ~~~ ~~~ ~~ ~ 2D0~ APPROVED BY ' THE COMMISSION ''~~' Approved By: OMMISSIONER Date <,/ Form 10-403 Revised 07/2005 Submit In Duplicate ORIGI~I~L • To: Winton Aubert Petroleum Engineer ~.J Alaska Oil & Gas Conservation Commission ~J From: Sean McLaughlin CTD Engineer Date: May 3, 2006 Re: NK-14A -Temporary Shutdown of Drilling Operations As allowed under regulation 20 AAC 25.072, BP is applying for a temporary shutdown of drilling operations on NK-14A. The NK-14A well results were disappointing because the shallow target (best quality sand) was swept i" and the deeper target sands were poorly developed or absent. There was insufficient pay to justify a completion; in addition an expensive RWO in order to flow the well was needed. Over 18,000' of tubing needed to be pulled, with the possibility of also running a 7000' scab liner. Neither BP, nor the partners felt that the reserves in the j well would support a RWO plus completion costs. The plan forward is to move the rig while the subsurface team regroups and evaluates options for NK-14. At this time the well remains a candidate for redrilling. The proposed condition of the wellbore is as follows: The drilling fluid in the tubing will be displaced to 9.0 ppg brine with freeze protect fluid down to 5000'. An IBP will be set in the tubing tail at 17930' to aid in pressure monitoring/testing of the IA. 5 I~..w~ ~ wK- ci..~! rl r o ~. 3 vwwr ~-~, s Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra Stewman/Terrie Hubble ~ ~,- S . Nl c Lccu~ G..~e k , Ir.! G l~ 30(0 - V3 I "TREE _~ 4" CNV WELLHEAD= FMC 13-5/8" UNN ERSA L ACTUATOR= BAKER KB. ELEV = 59.8' BF. ELEV = 24.03' KOP = 1825' Max Angle = 69 @ 9400' Datum MD = 18224' Datum ND = 9200' SS ~ 13-3/8" CSG, 68#, L-80, D = 12.415" ~ Minimum ID = 3.8" ~ 17969' 4-1/2" HES'XN' NIPPLE TOP OF 7" LNR ~ 17962' 4- I /2" HES 'XN' NIP ID = 3 8° 17969' 4-1/2" TBG, 12.6#, NT-80, .0152 bpf, ID = 3.958" 17982' CSG, a7#, NT-8o, ID = s.ss1" i~ 18121' PERFORATION SUMMARY REF LOG: FMT/GR ON 05/22/96 A NGLE AT TOP PERF: 63° (~ 18220' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-718" 6 18220 - 18240 ~soiated proposed 4-1/2" 5 18256 - 18276 ~selated proposed 4-1/2" 5 18284 - 18418 Isolated proposed ST MD ND DEV NPE VLV LATCH PORT DATE 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OT1S TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB DMY RA 4-1 /2" NP, HES X, ~ = 3.813" I 9-5/8" X 4-1/2" TtW HBBP PKR, W/ANCHOR LATCH, ID = 3.916" I 17930' I I 4-1 /2" HES 'X' NP, ID = 3.813" I 9-5/8" X 7" TIEBACK, BAKER LNR TOP PKR 8 FLEXLOCK LNR HGR, ID = 6.313" I ~~avv ~ I rlrvv 11 -LVVVW iwvv~ai ~ 4-1,3~ ~'~oen Hoie ~JK-14A 19660' n n Holy - NK-14AP81 I 20542' Mechanical Whipstock 18612' PBTD = 6.184" DATE REV BY COMMENTS DATE REV BY COMMENTS 06/08/96 ORIG COMPLETION, (POOL 7) 03/31 /03 BGG/TLH NDSS UPDATE 02/27/01 SIS-LG FINAL 05/16/01 RN/TP CORRECTIONS 09/20/01 DRS/KK PACKER CORRECTION 09/26/01 CWS/KK PERFS 04/04/02 RL/TLH GLV UPDATE I FISH - 2 ROLLERS AND 2 ALLEN SCREWS OFF ROLLER STEM 8/13/96 NIAKUK UNIT WELL: NK-14 PERMtT No: 1960660 API No: 50-029-22668-00 Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL BP Exploration (Alaska) NK-14A ~ Proposed CTD Sidetrack 2120' --~ 4-1/2" TRSV, HES SERIES 10 NP, ID = 3.813" II GAS LIFT MANDRELS a~c~ ~03 ~ STATE OF ALASKA http://www.state.ak.us/locaUakpages/ADMIN/ogc/orders/co/co300_... • STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501-319? Re: The Application of BP Exploration (Alaska) Inc. )Conservation Order No. 329 to present testimony for classification of a new ) oil pool and to prescribe pool rules for development )Prudhoe Bay Field of the Niakuk Oil Pool within the Prudhoe Bay Field. )Niakuk Oil Pool January 11, 1994 IT APPEARING THAT 1. By letter dated September 22, 1993, BP Exploration (Alaska) Inc. requested a public hearing to present testimony for establishing pool rules for development and operations in the Niakuk reservoir. 2. Notice of public hearing to be held on October 28, 1993 was published in the Anchorage Daily News on September 28, 1993. 3. A hearing concealing the matter of the applicant's request was convened in conformance with 20 AAC 25.540 at the Commission's offices, 3001 Porcupine Dr. Anchorage, Alaska 99501 at 9:00 am October 28, 1993. 4. ARCO Alaska, Inc. requested the areal limits of the pool be expanded beyond the limits proposed by BP Exploration (Alaska) Inc. (see addendum decision). 5. The hearing was reconvened on November 15, 1993 at 9:00 atn. 6. Testimony was offered by BP Exploration (Alaska) Inc., ARCO Alaska, Inc., Exxon Company, U.S.A. and the Alaska Department of Natural Resources, Division of Oil and Gas. 7. The hearing record was closed December 3, 1993. Findings: 1. The area planned for development by BP Exploration (Alaska) Inc. and described as the Niakuk reservoir underlies portions of ADL leases 34625, 34630, 34634, and 34635. BP Exploration (Alaska) Inc. is operator and I00% working interest owner of these leases. The State of Alaska is the lessor and 100% owner of the royalty interests. 2. ARCO Alaska, Inc. requested that the pool rules area include portions of ADL 34626 and ADL 34629, to which BP Exploration (Alaska) Inc. objected. The Commssion's decision concerning ARCO Alaska, Ine.'s request is an addendum to this order. 3. The Niakuk 5 and Niakuk 6 wells, drilled on ADL 34635, tested hydrocarbon production from the Kuparuk River Formation at oil rates between 1800 and 4800 BO/D. ~}. The Niakuk 1 and lA wells, drilled on ADL 34630, encountered measurable hydrocarbon sahiration in the Kuparuk River Formation, but the wells were not tested. 5. The Niakuk 6 well contains the entire stratigraphic interval for the Kuparuk River Formation, which 1 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://www.state.ak.us/local/akpages/ADMIN/ogc/orders/co/co300_... occurs between 951 feet TVD subsea and 9842 feet TVD subsea. 6. The Prudhoe Bay Unit encompasses the BP Exploration (Alaska) Inc. leases proposed for development. 7. Lateral heterogeneity and abrupt fades change characterize the Kuparuk River Formation in the area plamle~d for development by BP Exploration (Alaska) Inc. 8. Numerous moderate displacement normal faults cut the Niakuk reservoir. 9. The Niakuk reservoir contains two elongated, oil-bearing segments that do not appear to be in hydraulic communication. Normal faults bound the two segments on the north and south. 10. The western segment (Segment 1) contains approximately 545 acres. An inferred depositional pinch out marks the eastern limit of Segment 1. The western limit of the oil accumulation is uncertain. 11. The eastern segment (Segment 2) contains approximately 1,310 acres. Structural dip and the oil-water contact controls the eastern limit of Segment 2. A depositional pinch out of the reservoir marks the western limit of Segment 2. 12. The following are rock properties for the Kuparuk River Formation determined by analysis of log, core and test data from the Niakuk 1, Niakuk lA, Niakuk 2, Niakuk 2A, Niakuk 5, and Niakuk 6 wells. Porosity Permeability Net/Gross Oil Seb Went Saturation 1 Zone 3 24.4% 6-1250 and 1.0 66% Zone 4 15.2% 6-1250 and .95 75% Segment 2 Zone D 19.5% 1-1169 md. .87 67% Zone F 23.0% 1-3008 and .98 79% 2 of 10 2!27/2006 2:25 PM STATE OF ALASKA http://www.state.ak.us/locaUakpages/ADMIN/ogc/orders/co%o300 ... 13. Fluid roe ~ ~ ~ ~ p p rties are based on reservoir fluid samples from Niakuk 5 m Segment ~. Initial reservoir pressure is 4461 psia at 8900' TVD subsea. Bubble point pressure is estimated at 3835 psia. Reservoir temperature is 181 oF. Oil gravity measures 24.9o API, viscosity 1.4 centipoise~ and oil formation volume factor 1.31 RB/STB at bubble point pressure. 14. Agas-oil-contact (GOC) has not been identified in the Niakuk wells. 15. The oil-water contact (OWC) is estimated at 9244' TVD subsea in Segment 1 and at 9520' TVD subsea in Segment 2. 16. Estimated original oil in place (OOIP) for the Niakuk reservoir is 137.4 MMSTB (56.1 MMSTB in Segment 1 and 81.3 MMSTB in Segment 2) and original gas in place (OGIP) is 90.9 BSCF. 17. The Niakuk reservoir will be developed from a drill site constructed at Heald Point. Well testing facilities will be installed at the Niakuk drill site. 18. The operator proposes to set conductor casing to 80 feet below pad level in compliance with 20 AAC 25.030. 19. The operator proposes to set surface casing no deeper than 5000 feet TVD in compliance with 20 AAC 25.030. 20. Permafrost is present in the Heald Point area to a depth of 1900 feet. 21. No hydrocarbons or abnormal pressures have been encountered above 5000' TVD subsea in the Niakuk wells drilled to date. 22. The operator proposes to install fail-safe, automatic surface and subsurface safety valves (SSV's & SSSV's) in all wells capable of unassisted flow of hydrocarbons. 23. The Commission may require SSV's and SSSV's in wells capable of unassisted flow of hydrocarbons in areas deemed appropriate under 20 AAC 25.265. 24. In certain cases, the SSSV's must be removed temporarily to allow passage of certain eduipment and performance of well maintenance. 25. A total of 9 producers and 5 injectors are currently plamled for the Niakuk reservoir. 26. The operator proposes to commingle production from Niakuk wells with production fromother oil pools for processing at the Lisburne Production Center (LPC). 27. The Cotnrnission has previously approved surface commingling of Lisburne, Pt. McIntyre, Stump Island and West Beach production for processing through the LPC. 28. The operator testified that commingling production and utilizing existing production facilities extends field life and reduces capital investments and per barrel operating costs for small hydrocarbon accumulations. 29. The operator estimates that 100 million additional barrels of oil will be recovered by allowing commingled production from Niakuk, Pt. McIntyre, Stump Island, West Beach and Lisburne reservoirs. 3 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://wwwstate.ak.us/local/akpages/ADMIN/ogc/orders/co/co300_... • 30. BP has reached agreement with the Lisburne working interest owners to commingle Niakuk production with production from the Lisburne, Pt. McIntyre, West Beach and other fields within the area defined as the "Greater Pt. Mchltyre Area" (GPMA). 31. Monthly well tests will be used to allocate production to each producing well. The operator proposes to test each well twice monthly, conditions permitting. Optimum well test stabilization and duration times will vary from well to well and may change with time. 32. NGL's will be allocated based on gas volume produced and computer simulated process yields. 33. The Lisburne Data Gathering System (LDGS) will be utilized to monitor the flowing status, pressures and temperatures of Niakuk wells. 34. Process capacities at LPC will be increased from 100 to 135 MB/D oil and from 25 to 200 MB/D water. Gas processing capacity is expected to remain at 460 MMSCF/D. Facility expansions are expected to be completed in 4th Quarter 1994. 35. hlitial share of process capacity at the LPC among commingled pools will be based on producing gas-oil ratios. 36. The operator proposes to determine reservoir pressure with initial and periodic surveys on each well using a datum of 9200' TVD subsea. 37. The operator will use production logs, including flow meters, temperature and other diagnostic tools, to study reservoir performance. 38. Produced gas allocated to Niakuk, less gas sold or used for lease purposes, will be injected into the Lisburne oil pool. 39. The operator proposes to initiate waterflooding within one year after commencement of regular production. 40. The operator does not expect to create moveable gas saturations before commencement of waterflood. 41. Primary recovery mechanism for the Niakuk reservoir is solution gas drive. Model studies indicate expected recovery for primary depletion is 4% of OOIP. 42. Estimated recovery with waterflooding is 40% of OOIP. 43. The operator's model indicates that delaying waterflood one year after regular production will not harm ultimate recovery. 44. The operator proposes initial waterflood injection rates greater than voidage rate to provide pressure support and increase reservoir pressure above bubble point pressure. 45. Initially, produced water will be injected in the LPC Cretaceous disposal wells. 46. Regular production is expected to start in April 1994, at approximately 15 MB/D and rise to 23 MB/D in April 1995. 47. Offtake rate and waterflood sensitivity studies indicate no impact on ultimate recovery using rates 4 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://wwwstate.ak.us/locaUakpages/ADMIN/ogc/orders/co/co300_... • from 15-20 MB/D and starting waterflood within one year of initial production. 48. BP Exploration will operate the Niakuk reservoir, conducting facility construction, drilling, well operations and reservoir management. ARCO Alaska, Inc., as operator of the LPC, will provide well testing and production allocation support functions. Conclusions 1. Commercially exploitable hydrocarbons are present within two separate segments in an area planned for development by the operator and described as the Niakuk reservoir. 2. Pool rules for the development of the Niakuk reservoir are appropriate at this time. 3. An integration of interests for the area contemplated for development by the operator exists between the working interest owner and royalty owner. 4. The vertical limits of the Niakuk reservoir may be defined in the Niakuk 6 well which appears to be a typical and representative well. 5. Optimum well spacing will depend on reservoir properties and sweep efficiency. 6. Statewide well spacing does not allow suff dent latitude in the selection of well locations because of the elongate shape, small size, and structural and stratigraphic complexity of the reservoir. 7. Other than establishing setting depths, the operator is not requesting variance from statewide casing and cementing requirements. 8. The Heald Point drillsite is an onshore location. 9. Because of the proximity of the Heald Point drillsite to the Beaufort Sea, the use of fail-safe, automatic surface and subsurface safety valves are appropriate and may contribute to safe production operations 10. Surface commingling of Niakuk production with Lisburne, Pt. McIntyre, Stomp Island and West Beach production will increase ultimate recovery, will not cause waste nor jeopardize correlative rights. 11. Well tests are an appropriate means to allocate produced fluids back to the originating field for revenue and reservoir management purposes. 12. Periodic review of production allocation procedures is appropriate to evaluate techniques and to revise procedures if warranted. 13. Initial management of process capacity at the LPC using producing GOR is appropriate, however, in the event of capacity proration each producing field should be equitably handled. 14. Appropriate reservoir surveillance data will be obtained to plan and optimize primary development, secondary recovery, and reservoir management plans. 15. Exception to gas-oil-ratios is not appropriate at this time because produced gas is not being returned to the reservoir and no additional recovery proj ect is scheduled for the first year of regular production. 5 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://www.state.ak.us/local/akpages/ADMIN/ogc/orders/co/co300_... 16. An exception to 20 AAC 2 .240 maybe considered in conjunction with waterflood or if production at more than twice original solution GOR is necessary for acquisition of pool performance data. 17. Waterflood will enhance oil recovery from the Niakuk reservoir. 18. Water injection may not commence until 20 AAC 25.40? and .460 are satisfied. 19. Subject to the rules below and statewide requirements, production from the Niakuk reservoir may occur in a manner that will protect freshwater, prevent waste, protect correlative rights, and provide for the maximum ultimate recovery of oil and gas that is prudent. NOW, THEREFORE, IT IS ORDERED THAT the plan of development submitted by BP Exploration (Alaska) Inc. is approved, subject to rules hereinafter set forth and state-wide requirements under 20 AAC 25, for the following affected area. Umiat Meridian T12N R15E Section 23 S/2 Section 24 SW/4 Section 25 All Section 26 All Section 36 NE/4 T12N Rlw Section 28 All Section 29 All Section 30 All Section 31 N/2 Section 32 N/2 Rule 1 Field and Pool Name The field is the Prudhoe Bay Field. Hydrocarbons underlying the affected area and contained within the Kupanik River Formation constitute a single associated gas and oil reservoir called the Niakuk oil pool. Rule 2 Pool Definition The Niakuk oil pool is def ned as the accumulation of oil and gas that correlates with the interval between 12,318 feet and 12,942 feet measured depth in the Niakuk 6 well. Rule 3 Well Spacing Upon application of the operator, the Commission may administratively approve the drilling of any 6 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://wwwstate.ak.us/locaUakpages/ADMIN/ogc/orders/co/co300_... • well to a bottom hole location greater than SOO lineal feet from the external boundary of the affected area. No well bore may be open to the Niakuk oil pool within 500 feet of the external boundary of the affected area nor within 1000 feet of another well capable of producing from the same pool. Rule 4 Casing and Cementing a. A conductor casing shall be set at least 75 feet below the surface. If cemented, cement to surface shall be verified by visual inspection. b. Surface casing shall be set at least 500 feet MD below the base of the permafrost but not below 5000 feet TVD subsea. c. Surface casing must have minimum axial strain properties of .5% in tension and .7% in compression to withstand forces generated by thaw subsidence and freeze back in permafrost. Rule 5 Automatic Shut In Equipment a. Upon completion, each well shall be equipped with: i. a fail-safe automatic surface safety valve (SSV) capable of preventing uncontrolled flow. ii. a fail-safe automatic subsurface safety valve (SSSV), unless other types of subsurface valve are approved by the Commission, shall be installed in the tubing string below the base of the permafrost and be capable of preventing uncontrolled flow. b. A well that is not capable of tmassisted flow of hydrocarbons, as determined by a "no flow" performance test witnessed by a Commission representative, is not required to have fail-safe automatic SSSV's. c. Safety valves maybe temporarily removed for not more than 15 days as part of routine well operations or repair without specific notice to, or authorization by the Commission. The SSV and SSSV may not be simultaneously out of service without specific authorization from the Commission. i. Wells with SSV's or SSSV's removed shall be identified by a sign on the wellhead stating that the valve bas been removed and the date of removal. ii. A list of wells with SSV's or SSSVs removed, removal dates, reasons for removal, and estimated re-installation dates must be maintained current and available for Commission inspection on request. d. The Low Pressure Sensor (LPS) systems shall not be deactivated except during repairs to the LPS, while engaged in active well work or if the pad is manned. If the LPS cannot be returned to service within 24 hours, the well must be shut-in at the well head and at the manifold building. i. Wells with a deactivated LPS shall be identified by a sign on the wellhead stating that the LPS has been deactivated and the date it was deactivated. ii. A list of wells with the LPS deactivated, the dates and reasons for deactivating, and the estimated re-activation dates must be maintained cun~ent and available for Commission inspection on request. Rule 6 Surface Commingling and Common Facilities 7 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://www.state. ak.us/local/akpages/ADMIN/ogc/orders/co/co3 00_... I • • a. Production from the Niakuk oil pool may be conuningled on the surface with production from other pools for processing at the LPC prior to custody transfer. b. Production from each well will be determined by the following well test allocation methodology. Allocation data and well test data will be supplied to the Commission monthly in both computer file and report formats. i. Conduct well tests to determine production rates for each well. ii. Calculate each well's theoretical monthly production (TMP) based on well test rate(s) and actual time on production. iii. Sum the TMP volume for all wells in all pools. iv. Determine an allocation factor as the ratio of the metered volume to the TMP for all wells in all pools (i.e., metered/TMP) v. Calculate each well's actual monthly production (AMP) volume as: AMP = TMP x Allocation Factor c. NGL's will be allocated to each pool based on actual gas production volumes and NGL process simulations. Process simulations will be updated at least once per year based on NGL samples and results reported to the Commission. d. Each producing well will be tested at least twice each month. Wells that have been shut in and cannot meet the twice monthly test frequency must be tested within five days of startup. All available test separator capacity within the constraints imposed by operating conditions must be utilized for well testing. e. Optimum test duration and stabilization time will be determined on a well by well basis by the operator. f. Water volumes will be determined by API/MPMS approved methods, or the use of industry proven, on-line water cut measurement devices approved by the Commission. g. API gravity will be determined for each producing well annually by an API/MPMS approved method. h. Gas samples will be taken and analyzed for composition from each non gas lifted producing well yearly. i. Quarterly allocation process reviews will be held with the Commission. j. This rule may be revised or rewritten after an evaluation period of at least one year. Rule 7 Production Anomalies In the event of oil production capacity proration at or from the LPC, all commingled pools produced at the LPC will be prorated by an equivalent percentage of oil production recognizing mechanical limitations and operational constraints. 8 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://www.state.ak.us/locaUakpages/ADMIN/ogc/orders/co/co300_... . ~ • Rule 8 Reservoir Pressure Monitoring a. Prior to regular production, a pressure survey shall be taken on each well to determine the reservoir pressure. b. A minimum of one bottom hole pressure survey per producing governmental section shall be obtained annually. The surveys in part 'a' of this rule may be used to fulfill the minimum requirements. c. The datum for all surveys is 9200' TVDss. d. Pressure surveys will be either a pressure buildup, pressure falloi~; RFT, or static bottom hole pressure after the well has been shut in for an extended period. e. The pressure surveys will be reported to the Conunission quarterly on form 10-412, Reservoir Pressure Report. All data necessary for complete analysis of each survey need not be submitted with the form 10-412 but must be submitted upon request. £ Results and data from any additional reservoir pressure tests, surveys or special montoring techniques shall be submitted in accordance with part 'e' of this rule. Rule 9 Niakuk Oil Pool Annual Reservoir Report. A surveillance report will be required within one year of regular production and annually thereafter. The report shall include but is not limited to the following: a. Progress of enhanced recovery project(s) implementation and reservoir management summary including engineering and geoteclulical parameters. b. Voidage balance by month of produced fluids and injected fluids. c. Analysis of reservoir pressure surveys within the pool. d. Results and where appropriate, analysis of production logging surveys, tracer surveys and observation well stu-veys. e. Results of any special monitoring. f. Future development plans. Rule 10 Offtake rate The offtake rate for the Niakuk oil pool shall not exceed 23 MB/D of oil averaged monthly. Rule 11 Additional Recovery Project Within one year of regular production, a waterflood or other Cotntnission approved secondary recovery project must commence. Rule 12 Administrative Action Upon proper application or its own motion, the Commission may administratively waive the requirements of any mile stated above or administratively amend this order as long as the change does 9 of 10 2/27/2006 2:25 PM STATE OF ALASKA http://www.state. ak.us/locaUakpages/ADMIN/ogc/orders/co/co3 00_... ' ~ ~ • not promote waste, jeopardize correlative rights or compromise ultimate recovery, and is based on sound engineering principles. DONE at Anchorage, Alaska and dated January 1 1, 1994. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission Russell A. Douglass, Commissioner Alaska Oil and Gas Conservation Commission Tuckeiman Babcock, Commissioner Alaska Oil and Gas Conservation Commission 'L~~~tservation Order ~nde 10 of 10 2/27/2006 2:25 PM ~ ~ ~~ , v ~ , ~ ~ ~~ a ~~ ~~~ ALASKA OIL A1QD GAS COI~SERQA7'IO1~T COrII-IISSI011T Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 ~J ~' i ~~ ~k rr Re: Prudhoe Bay Field, PBU NK-14A BP Exploration (Alaska) Inc. Permit No: 206-031 Surface Location: 1358' FSL, 944' FEL, SEC. 36, Bottomhole Location: Dear Mr. McLaughlin: FRANK H. MURKOWSKI, GOVERNOR 333 W. T" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 6~-3607 (pager). N DATED this ~ ~ day of March, 2006 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALA~IL AND GAS CONSERVATION COM~ON PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ~ ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number:z~tiq~ov PBU NK-14A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 20600 TVD 9230ss 12. Field /Pool(s): Prudhoe Bay Field / Niakuk Pool 4a. Location of Well (Governmental Section): Surtace: 1358' FSL 944' FEL SEC T12N R15E 36 UM 7. Property Designation: ADL 034625 , , , . , , Top of Productive Horizon: 3829' FSL, 1579' FEL, SEC. 23, T12N, R15E, UM 8. Land Use Permit: 13. Approximate Sp ate: Marc 1 , 2006. Total Depth: 2137' FSL, 2418' FEL, SEC. 23, T12N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 6600' 4b. Location of Well (State Base Plane Coordinates): Surtace: x- 721618 y- 5979895 Zone- ASP4 10. KB Elevation (Height above GL): 59.8' feet 15. Distance to Nearest Well Within Pool: 1050' 16. Deviated Wells: Kickoff Depth: 18240 feet Maximum Hole Angle: 95 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.0351 Downhole: 4300 Surtace: 3393 18. Casin Pro ram: S cifications To -Baffin De th - ttom QuanU of>Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" s-t/2° x a-s/ts• 8.81 # / 6.2# L-80 $TU TCI I 2665' 17935' 8969' 20600' 9230' 17 ' x 2a/s• / 6,16# a a f 19. PRESENT W ELL CONDITION S UMMARY (To be completed f or Redr111 and Re-entry Ope Total Depth MD (ft): 18700 Total Depth TVD (ft): 9373 Plugs (measured): None Effective Depth MD (ft): 18612 Effective Depth TVD (ft): unk (measured): 9330 18612 .Casin Len h <Size CemenYVolume MD TVD Conductor /Structural 80' 20" 60 sx Arcticset A rox. 80' 80' Surtace 6377' 13-3/8" 000 sx PF'E', 894 sx'G', 240 sx PF'C' 6417' 4518' Intermediate 18083' 9-5/8" 375 sx Class 'G' 18121' 9103' Liner 738' 7" 200 sx Class 'G' 17962' - 18700' 9039' - 9373' Perforation Depth MD (ft): 18220' - 18240' Perforation Depth TVD (ft): 9145' - 9235' 20. Attachments ®Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverfer Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer Prepared By Name/Number: Si nature ,~ ~°~ Phone 564-4387 Date ~ "' A~ Terrie Hubble, 564-4628 Commissiart Use Only Permit To Drill Number: ., API Number: 50- 029-22668-01-00 Permit ppro al Date: ` See cover letter for other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce Coalbed urethan as hydrates, or gas contained shales: Samples Req'd: ^ Yes ~; o Mud Log Req'd: ^ Yes ~No HZS Measures: Yes N Directional Survey Req'd: Yes ^ No Other: ~~ ~A~ 1 ~ ~~~~ ~/~~ O APPROVED BY THE COMMISSION Date r ,COMMISSIONER Form 10-401 Revised 12/2005 l~ v `~ Submit In Duplicate • BP Prudhoe Bay NK-14A CTD Sidet CTD Sidetrack Summary Pre-Rig Work: 1. O AC-LDS; AC-PPPOT-IC, T 2. C Clean out tubing 3. C Dummy whipstock drift to 18300'. 4. S Set DGLV 5. S Caliper the tubing and the liner 6. O MIT-IA, and OA. 7. E Set the whipstock at 18240'. 8. O Bleed gas lift and production flowlines down to zero and blind flange 9. O Remove wellhouse, level pad The pre CTD wotork is slated to begin on March 7, 2006. wL S ~ o ' 4~ l cv~ ~ Yt7 V c~, ( ' Rig Work: % 1. MIRU and test BOPE to 250 psi low and 4000 psi high. 2. Squeeze cement past the whipstock 3. Mill 3.8" window at 18240' and 10' of rathole. Swap the well to Flo-Pro. 4. Drill Build: 4.125" OH, 210' (40 deg/100 planned) 5. Drill Lateral: 4.125" OH, 2150' horizont w/resistivity (12 deg/100 planned) 6. Run 3 lh" x 3 3/16" x 2 7/8" solid line eav' g TOL at 17935' 7. Pump primary cement job to TOL, 3 bl}Yof 15.8 ppg liner cmt planned 8. Cleanout liner and MGR/CCL log `-~~'J 9. Test liner lap to 2000 psi. 10. Perforate liner per asset instructions (--500') l 1. Freeze protect well, RDMO Post-Rig Work: 1. Move wellhouse, Install production flowline 2. Run GLVs 3. Flowback well to separator Mud Program: • Well kill: 9.6 ppg e • Milling/drilling• .6 pg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Casing Program: ~ • 3 I/z" x 3 3/16" x..2..7/8" fully cemented liner - 17935'MD to 20600'MD • A minimum o,~ 6 ~bls 15.8 ppg cement will be used for liner cementing. Casing/Tubi g Information 13 3/8", N-80, 68#, Burst 5020 psi; collapse 2260 psi 9 5/8", L-80 47#, Burst 6870, collapse 4750 psi 4'h", L-80, 12.6#, Burst 8431; collapse 7500 psi Well Control: BOP diagram is attached. Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4000 psi. ~ The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 95 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 6600 ft. • Distance to nearest well tin pool - 1.050 ft. i Logging • MWD directional, Gamma Ray, resistivity will be run over all of the open hole section. • A cased hole GR/CCL log will be run. Hazards t • The maximum recorded H2S level on NK-62a is OO ppm . • Lost circulation risk is medium, crossing one fa~~ Reservoir Pressure Res. press. is estimated to be 4300 psi at 9075'ss (9.1 ppg EMW). Max. surface pressure with gas (0.10 psi/ft} to surface is 3393 psi. ~ ~~ _ 4" CIW • NK-14 WELLHEAD= FMC 13-5/8" UNN ERSA L ACTUATOR= BAKER KB. ELEV..- ...59.8' BF. ELEV = 24.03' KOP = _ _ _ .. 1825' Max Angle = 69 @-9400' Datum MD = 18224' Datum ND = 9200' SS TOP OF 7" LNR ~-~ 17962' (4-1/2" TBG, 12.6#, NT-80, .0152 bpf, ID = 3.958" I-~ 17982' 13-3/8" CSG, 68#, L-80, ID = 12.415" ~-{ 6417' Minimum ID = 3.725" @ 17969' 4-1/2" HES'XN' NIPPLE 9-5/8" CSG, 47#, NT-80, ID = 8.681" I-I 18121' PERFORATION SUMMARY REF LOG: FMT/GR ON 05/22/96 ANGLE AT TOP PERF: 63° @ 18220' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 18220 - 18240 O 09/26/01 4-1/2" 5 18256- 18276 O 06/01/96 4-1 /2" 5 18284 - 18418 O 06/01 /96 NOTES: 2120' -i 4-1/2" TRSV, HES SERIES 10 NIP, ID = 3.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OTIS TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB DMY RA 17913' 4-1 /2" NIP, HES X, ID = 3.813" 17925' 9-5/8" X 4-1/2" TMJ HBBP PKR, W/ANCHOR LATCH, ID = 3.916" 17949' 4-1/2" HES 'X' NIP, ID = 3.813" 17962' 9-5/8" X 7" TIEBACK, BAKER LNR TOP PKR & FLEXLOCK LNR HGR, ID = 6.313" 17969' 4-1/2" HES'XN' NIP, ID = 3.725" 17982' 4-1/2" TUBING TAIL WLEG 17980' ELMD TT -LOGGED 10/06/97 18612' ~ FISH - 2 ROLLERS AND 2 ALLEN SCREWS I OFF ROLLER STEM 8/13/96 PBTD 18612' 7" LNR, 29#, NT-80, .0371 bpf, ID = 6.184" 18700' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/08/96 ORIG COMPLET~N, (POOL 7) 03/31/03 BGG/TLH NDSS UPDATE 02/27/01 SIS-LG FINAL 05!16/01 RN/TP CORRECTIONS 09/20/01 DRS/KK PACKER CORRECTION 09/26/01 CWS/KK PERFS 04/04/02 RL/TLH GLV UPDATE NIAKUK UNff WELL: NK-14 PERMff No: 1960660 API No: 50-029-22668-00 Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL BP Exploration (Alaska) TREE _ 4" CNV ~ NK-14A'~ Proposed CTD Sidetrack NOTES: WELLHEAD= _ _ _ FMC 13-5/8" __ U_NNERSAL Y _ ACTUATOR= BAKER KB. ELEV = 59.8' BF. ELEV = 24.03' KOP = 1825' Max Angle = 69 @ 9400' Datum MD = 18224' Datum ND = 9200' SS 13-3/8" CSG, 68#, L-80, ID = 12.415" l~ 641T Minimum ID = 3.725" @ 17969' 4-1 /2" HES'XN' NIPPLE (milled to 3.8") TOP OF 7" LNR 4-1/2" HES'XN' NIP, ID = 3.725" milfec7to 3~$~ 4-1/2" TBG, 12.6#, NT-80, .0152 bpf, ID = 3.958" 2120 ~ 4-1/2" TRSV, HES SERIES 10 NIP, ID = 3.813" GAS LIFT MANDRELS O ST MD ND DEV TYPE VLV LATCH PORT DATE 4 4004 3510 54 OTIS TB DOME RA 16 04/04/02 3 11059 6431 64 OTIS TB SO RA 24 04/04/02 2 15276 8079 67 OTIS TB DMY RA 1 17842 9104 68 OTIS TB OMY RA 17913 I-~ 4-1/2" NIP, HES X, ID = 3.813" 17925' 9-5/8" X 4-1/2" TNV HBBP PKR, ~ I W/ANCHOR LATCH, ID = 3.916" 17935' Top of Cement 17935' TOP OF 3-3/16" LNR 17949 4-1 /2" HES 'X' NIP, ID = 3.813" 17962' 9-5/8" X 7" TIEBACK, BAKER LNR TOP PKR 8~ FLEXLOCK LNR HGR ID = 6.313" 17959' 3.5" XN Nip 2.75" ID 17982' 4-1/2" TUBING TAIL WLEG ELMD TT -LOGGED 10/06/97 9-5/8" CSG, 47#, NT-80, ID = 8.681" l~ 18121' 18800' I-i 3-3/16 x 3-3/16" X 2-7/8" cmt'ed and perfed 20600' ~ 18240' Mechanical Whipstock 18612' ~ FISH - 2 ROLLERS AND 2 ALLEN SCREWS OFF ROLLER STEM 8113/96 1 I 7" LNR, 29#, NT-80, .0371 bpf, ID = 6.184" I DATE REV BY COMMEMS DATE REV BY COMMENTS 06/08/96 ORIG COMPLETION, (POOL 7) 03/31/03 BGG/TLH NDSS UPDATE 02/27/01 SIS-LG FINAL 05/16/01 RN/TP CORRECTIONS 09/20/01 DRS/KK PACKER CORRECTION 09/26/01 CWS/KK PERFS 04/04/02 RL/TLH GLV UPDATE NIAKUK UNff WELL: NK-14 PERMIT No: 1960660 API No: 50-029-22668-00 Sec. 36, T12N, R15E, 2199.25 FEL 1321.43 FNL BP Exploration (Alaska) by ~ BP Alaska Baker Hughes INTEQ Planning Report ~a~ ~s INTEQ Company:. BP AmocA Date: 2/17/2008 Time:. 16:44:37 P:ge 1 Field: Niakuk Coordinate(NE) Reference: Well:. NK-14, True iVorth Site:. NK Main Pad Vertical (TVD) Reference: 10 :14 10118/199310:09 59.8 Wells NK-14 , Section (VS) Referenee: "Well (O.OON,O.OOE,t90.00Azi) Wellpath: PIan3, NK-14A Snrvey Cakuhtion Method: Minimum Curvature Db: Oreda Field: Niakuk North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System:. Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: NK Main Pad TR-12-15 UNITED STATES :North Slope Site Position: Northing: 5981257.79 ft Latitude: 70 21 5.879 N Froro: Map Essting: 714553.26 ft Longitude: 148 15 27.984 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.64 deg Well: NK-14 Slot Name: 14 NK-14 Well Position: +N/-S -1564.96 ft Northing: 5979894.64 ft Latitude: 70 20 50.455 N +E/-W 7022.88 ft Eastiug : 721617.74 ft Longitude: 148 12 2.773 W Position Uncertainty: 0.00 ft Welipath: PIan3, NK-14A Drilled From: NK-14 Tie-on Depth: 18225,00 ft Current Datum: 10:14 10/16/199310:09 Height 59.80 ft Above System Datum: Mean Sea Level Magnetic Dats: 2/17/2006 Deciioatlon: 24,87 deg Field Strength: 57629 nT Mag Dip Angle: 80.98 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 40.70 0.00 0.00 190.00 Plan: Plan #3 Date Composed: 2/17/2006 Copy Lamars PIan3 Version: 3 Principal: Yes Tied-to: From: Definitive Pafh Targets Map Map 4--- Latitnde -> <--- Longitnde -> ~ Name Descriptioa TVD +N/-S +E/-W Northing Fasting Deg Min Sec Deg Miq Sec ::Dip. Dir..... ft ft ft ft ft_ NK-14A Polygon 59.80 13053.44 -5739.47 5992772.08 715495.05 70 22 58.813 N 148 14 50.774 W -Polygon 1 59.80 13053.44 -5739.47 5992772.08 715495.05 70 22 58.813 N 148 14 50.774 W -Polygon 2 59.80 13202.50 -5908.15 5992916.08 715322.05 70 23 0.277 N 148 14 55.715 W -Polygon 3 59.80 13214.44 -6108.89 5992922.08 715121.05 70 23 0.393 N 148 15 1.592 W -Polygon 4 59.80 13171.12 X403.31 5992870.08 714828.05 70 22 59.965 N 148 15 10.209 W -Polygon 5 59.80 12961.05 -6674.66 5992652.08 714563.05 70 22 57.897 N 148 15 18.146 W -Polygon 6 59.80 12128.86 -6952.40 5991812.08 714310.05 70 22 49.710 N 148 15 26.253 W -Polygon 7 59.80 11195.13 -7112.08 5990874.08 714178.05 70 22 40.525 N 148 15 30.901 W -Polygon 8 59.80 11091.04 -6332.79 5990793.08 714960.05 70 22 39.508 N 148 15 8.093 W -Polygon 9 59.80 11954.20 -6324.26 5991656.08 714943.05 70 22 47.997 N 148 15 7.865 W -Polygon 10 59.80 12717.83 -5893.47 5992432.08 715351.05 70 22 55.511 N 148 14 55.274 W NK14A Fauft1 59.80 13360.64 -6248.63 5993064.08 714977.05 70 23 1.830 N 148 15 5.686 W -Polygon 1 59.80 13360.64 -6248.63 5993064.08 714977.05 70 23 1.830 N 148 15 5.686 W -Polygon 2 59.80 11021.00 -5960.68 5990734.08 715334.05 70 22 38.822 N 148 14 57.202 W NK14A Fault2 59.80 13282.12 -5420.56 5993010.08 715807.05 70 23 1.064 N 148 14 41.444 W -Polygon 1 59.80 13282.12 -5420.56 5993010.08 715807.05 70 23 1.064 N 148 14 41.444 W -Polygon 2 59.80 13266.09 -7313.94 5992938.08 713915.05 70 23 0.891 N 148 15 36.867 W NK14A Fault4 59.80 12786.05 -7962.46 5992439.09 713281.04 70 22 56.163 N 148 15 55.836 W -Polygon 1 59.80 12786.05 -7962.46 5992439.09 713281.04 70 22 56.163 N 148 15 55.836 W -Polygon 2 59.80 11091.83 -7137.16 5990770.09 714156.04 70 22 39.509 N 148 15 31.632 W NK14A Fault3 59.80 11102.07 -5387.01 5990832.07 715905.04 70 22 39.624 N 148 14 40.417 W -Polygon 1 59.80 11102.07 -5387.01 5990832.07 715905.04 70 22 39.624 N 148 14 40.417 W -Polygon 2 59.80 11352.80 -7504.62 5991020.07 713781.04 70 22 42.072 N 148 15 42.393 W NK-14A Target 3 9134.80 12326.32 -6626.41 5992019.08 714630.04 70 22 51.654 N 148 15 16.717 W NK-14A Target 4 9134.80 11792.95 -6724.23 5991483.08 714548.04 70 22 46.408 N 148 15 19.587 W NK-14A Target 1 9153.80 13055.35 -5939.51 5992768.08 715295.05 70 22 58.830 N 148 14 56.630 W by ~ BP Alaska Baker Hughes INTEQ Planning Report BAi~R ~ ~~ INTEQ Company: BP Amoco Date: 2 /1 7120 0 6 Time:. 16:44:37 Paget 2 Field: Niakuk Co-ordinate(NE) Reference: WeIL• NK-14; Tae North '- Site: NK Main Pad Vertical (TVD) Reference: 10:14101161199310:09:59.8 Well: NK-14 Secton (VS) Reference: Well (O.OON,O.OOE,190.OOAzi) Weitpat6: PIan3, NK- 14A Servey Caknlatlon Method: Minimum Curvature Db Orede Targets Map Map <--- Latitude ---> ~- l.oagitnde Name Descriptlon TVD +N/-S +E/-W Northing EastIng Deg Min Sec Deg Min a. Sec Dlp. DU. ft ft ft ft ft NK-14A Target 2 9200.80 13142.65 -6151.03 5992849.08 715081.05 70 22 59.687 N 148 15 2.823 W NK-14A Target 5 9289.80 11341.69 -6756.59 5991031.08 714529.04 70 22 41.970 N 148 15 20.502 W Annotation MD TVD ft ft 18225.00 9147.06 TIP 18240.00 9153.68 KOP 18260.00 9162.26 End 9 Deg/100' DLS 18290.00 9172.44 4 18440.00 9198.79 End 40 Deg/100' DLS 18609.34 9198.19 6 19184.34 9155.03 7 19384.34 9141.29 8 19559.34 9135.27 9 20084.34 9135.33 10 20600.00 0.00 TD Plan Section Intormadon MD Incl Azim ' TVD +N/S +EI-W DLS BaiW Tarn TFO Target ft deg deg -ft ft ft deg/100ft deg/100ft deg/100ft ,deg 18225.00 63.88 332.53 9147.06 13043.53 -5933.26 0.00 0.00 0.00 0.00 18240.00 63.71 332.57 9153.68 13055.47 -5939.47 1.16 -1.13 0.27 168.09 18260.00 65.48 332.23 9162.26 13071.48 -5947.84 9.00 8.87 -1.72 350.00 18290.00 74.87 324.27 9172.44 13095.40 -5962.71 40.00 31.29 -26.53 320.00 18440.00 86.70 264.48 9198.79 13152.26 -6091.51 40.00 7.88 -39.86 275.00 18609.34 93.70 245.39 9198.19 13108.49 -6254.17 12.00 4.14 -11.27 290.00 19184.34 93.84 176.22 9155.03 12645.44 -6530.34 12.00 0.02 -12.03 272.70 19384.34 93.92 200.28 9141.30 12449.43 -6558.76 12.00 0.04 12.03 89.00 19559.34 89.99 220.93 9135.27 12299.75 -6647.33 12.00 -2.24 11.80 100.30 20084.34 90.00 157.93 9135.33 11807.54 -6729.03 12.00 0.00 -12.00 270.00 20600.00 57.28 213.86 9290.08 11342.36 -6755.61 12.00 -6.35 10.85 127.80 Snrvey MD Intl Aim Sys TVD N/S FdW' MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg... 18225.00 63.88 332.53 9087.26 13043.53 -5933.26 5992756.44 715301.64 0.00 -11815.07 0.00 MWD 18240.00 63.71 332.57 9093.88 13055.47 -5939.47 5992768.20 715295.09 1.16 -11825.75 168.09 MWD 18240.27 63.73 332.57 9094.00 13055.69 -5939.58 5992768.41 715294.97 9.00 -11825.94 350.00 NK-14A 18250.00 64.60 332.40 9098.24 13063.45 -5943.62 5992776.05 715290.70 9.00 -11832.89 350.00 MWD 18260.00 65.48 332.23 9102.46 13071.48 -5947.84 5992783.95 715286.25 9.00 -11840.06 350.08 MWD 18270.00 68.57 329.47 9106.36 13079.52 -5952.32 5992791.85 715281.53 40.00 -11847.20 320.00 MWD 18280.00 71.70 326.82 9109.76 13087.50 -5957.29 5992799.69 715276.33 40.00 -11854.20 321.08 MWD 18290.00 74.87 324.27 9112.64 13095.40 -5962.71 5992807.42 715270.68 40.00 -11861.04 321.98 MWD 18300.00 75.26 320.15 9115.21 13103.03 -5968.63 5992814.87 715264.54 40.00 -11867.53 275.00 MWD 18310.00 75.72 316.04 9117.72 13110.23 -5975.09 5992821.88 715257.86 40.00 -11873.50 276.06 MWD 18320.00 76.24 311.96 9120.15 13116.97 -5982.07 5992828.41 715250.69 40.00 -11878.92 277.09 MWD 18330.00 76.84 307.89 9122.47 13123.21 -5989.53 5992834.43 715243.05 40.00 -11883.77 278.08 MWD 18340.00 77.50 303.84 9124.70 13128.92 -5997.43 5992839.90 715234.99 40.00 -11888.02 279.03 MWD 18350.00 78.22 299.82 9126.80 13134.08 -6005.73 5992844.81 715226.53 40.00 -11891.66 279.93 MWD 18360.00 78.99 295.82 9128.78 13138.65 -6014.40 5992849.12 715217.74 40.00 -11894.66 280.77 MWD 18370.00 79.82 291.83 9130.62 13142.62 -6023.39 5992852.82 715208.63 40.00 -11897.00 281.57 MWD 18380.00 80.70 287.87 9132.31 13145.97 -6032.66 5992855.89 715199.27 40.00 -11898.69 282.30 MWD 18390.00 81.61 283.93 9133.85 13148.67 -6042.16 5992858.32 715189.69 40.00 -11899.70 282.97 MWD 18400.00 82.57 280.01 9135.22 13150.73 -6051.85 5992860.08 715179.95 40.00 -11900.05 283.58 MWD 18410.00 83.56 276.11 9136.43 13152.12 -6061.67 5992861.18 715170.09 40.00 -11899.71 284.11 MWD 18420.00 84.58 272.22 9137.46 13152.84 -6071.59 5992861.61 715160.15 40.00 -11898.70 284.59 MWD 18430.00 85.63 268.35 9138.32 13152.89 -6081.55 5992861.37 715150.19 40.00 -11897.02 284.99 MWD 18440.00 86.70 264.48 9138.99 13152.26 -6091.51 5992860.45 715140.26 40.00 -11894.67 285.32 MWD by ~ BP Alaska Baker Hughes INTEQ Planning Report B/1K~R • limos INTEQ ..Company: BP Amoco Date: 2!1712006 Time: 16:44:3T Page; ` 3 Field: Niakuk Co-ordioate(NE) Retereace: Well: NK- 14, True North. Site: NK Main Pad Vertical (TVD) Reference: 10 :'1410/16!199310:09 59.8 Weft: NK-14 Sectbn (VS) Reference: Well {O:OON,O.OOE190.OOAzi) Welipath: PIan3, NK-14A Survey Calwlation Metbod: Minimum Curvature bb: Orade Survey MD Iuci Azim Sys.TVD N/S EIW MapN MapE Dl[.5 VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg... 18450.00 87.11 263.35 9139.53 13151.21 -6101.44 5992859.10 715130.37 12.00 -11891.91 290.00 MWD 18475.00 88.14 260.53 9140.56 13147.70 -6126.17 5992854.87 715105.75 12.00 -11884.16 290.06 MWD 18500.00 89.18 257.72 9141.15 13142.99 -6150.71 5992849.43 715081.36 12.00 -11875.26 290.18 MWD 18525.00 90.21 254.90 9141.28 13137.07 -6174.99 5992842.80 715057.26 12.00 -11865.22 290.24 MWD 18550.00 91.25 252.09 9140.96 13129.97 -6198.96 5992834.99 715033.52 12.00 -11854.06 290.26 MWD 18575.00 92.29 249.27 9140.19 13121.71 -6222.54 5992826.03 715010.20 12.00 -11841.83 290.22 MWD 18600.00 93.32 246.45 9138.97 13112.30 -6245.66 5992815.94 714987.36 12.00 -11828.54 290.14 MWD 18609.34 93.70 245.39 9138.39 13108.49 -6254.17 5992811.89 714978.97 12.00 -11823.32 290.00 MWD 18625.00 93.79 243.51 9137.37 13101.75 -6268.27 5992804.74 714965.07 12.00 -11814.24 272.70 MWD 18650.00 93.92 240.51 9135.69 13090.05 -6290.30 5992792.39 714943.41 12.00 -11798.88. 272.58 MWD 18675.00 94.04 237.50 9133.96 13077.21 -6311.67 5992778.92 714922.42 12.00 -11782.53 272.38 MWD 18700.00 94.14 234.50 9132.18 13063.27 -6332.34 5992764.37 714902.17 12.00 -11765.21 272.17 MWD 18725.00 94.24 231.49 9130.35 13048.26 -6352.25 5992748.78 714882.72 12.00 -11746.97 271.95 MWD 18750.00 94.32 228.48 9128.48 13032.23 -6371.34 5992732.20 714864.11 12.00 -11727.87 271.73 MWD 18775.00 94.40 225.48 9126.58 13015.23 -6389.57 5992714.67 714846.40 12.00 -11707.96 271.51 MWD 18800.00 94.46 222.47 9124.65 12997.29 -6406.87 5992696.23 714829.63 12.00 -11687.29 271.28 MWD 18825.00 94.51 219.46 9122.69 12978.47 -6423.21 5992676.93 714813.86 12.00 -11665.92 271.05 MWD 18850.00 94.54 216.45 9120.72 12958.83 -6438.53 5992656.84 714799.12 12.00 -11643.91 270.81 MWD 18875.00 94.57 213.44 9118.74 12938.40 -6452.81 5992636.00 714785.46 12.00 -11621.32 270.57 MWD 18900.00 94.58 210.43 9116.74 12917.25 -6465.99 5992614.48 714772.91 12.00 -11598.21 270.34 MWD 18925.00 94.58 207.42 9114.75 12895.45 -6478.04 5992592.32 714761.51 12.00 -11574.63 270.10 MWD 18950.00 94.56 204.41 9112.75 12873.03 -6488.93 5992569.60 714751.29 12.00 -11550.67 269.86 MWD 18975.00 94.54 201.40 9110.77 12850.08 -6498.63 5992546.37 714742.27 12.00 -11526.38 269.62 MWD 19000.00 94.50 198.39 9108.80 12826.65 -6507.11 5992522.70 714734.49 12.00 -11501.84 269.38 MWD 19025.00 94.45 195.38 9106.85 12802.80 -6514.35 5992498.65 714727.95 12.00 -11477.09 269.14 MWD 19050.00 94.38 192.38 9104.93 12778.61 -6520.33 5992474.29 714722.69 12.00 -11452.23 268.90 MWD 19075.00 94.31 189.37 9103.03 12754.13 -6525.03 5992449.69 714718.72 12.00 -11427.31 268.67 MWD 19100.00 94.22 186.36 9101.17 12729.44 -6528.44 5992424.90 714716.04 12.00 -11402.40 268.45 MWD 19125.00 94.12 183.36 9099.35 12704.59 -6530.55 5992400.01 714714.66 12.00 -11377.56 268.22 MWD 19150.00 94.01 180.35 9097.58 12679.67 -6531.36 5992375.08 714714.59 12.00 -11352.88 268.00 MWD 19175.00 93.89 177.35 9095.86 12654.74 -6530.86 5992350.17 714715.83 12.00 -11328.42 267.79 MWD 19184.34 93.84 176.22 9095.23 12645.44 -6530.34 5992340.89 714716.63 12.00 -11319.35 267.58 MWD 19200.00 93.87 178.11 9094.17 12629.83 X529.56 5992325.31 714717.86 12.00 -11304.11 89.00 MWD 19225.00 93.91 181.11 9092.48 12604.89 -6529.39 5992300.39 714718.77 12.00 -11279.58 89.13 MWD 19250.00 93.94 184.12 9090.76 12579.98 -6530.53 5992275.46 714718.37 12.00 -11254.85 89.33 MWD 19275.00 93.96 187.13 9089.04 12555.16 -6532.98 5992250.58 714716.66 12.00 -11229.98 89.54 MWD 19300.00 93.97 190.13 9087.31 12530.51 -6536.72 5992225.83 714713.65 12.00 -11205.05 89.74 MWD 19325.00 93.97 193.14 9085.58 12506.08 -6541.75 5992201.27 714709.34 12.00 -11180.13 89.95 MWD 19350.00 93.95 196.15 9083.85 12481.96 -6548.05 5992176.96 714703.75 12.00 -11155.27 90.16 MWD 19375.00 93.93 199.16 9082.13 12458.19 -6555.62 5992152.99 714696.90 12.00 -11130.55 90.37 MWD 19384.34 93.92 200.28 9081.50 12449.43 X558.76 5992144.13 714694.02 12.00 -11121.38 90.57 MWD 19400.00 93.58 202.13 9080.47 12434.85 -6564.41 5992129.40 714688.80 12.00 -11106.04 100.30 MWD 19425.00 93.03 205.09 9079.03 12411.99 -6574.41 5992106.25 714679.48 12.00 -11081.79 100.42 MWD 19450.00 92.48 208.04 9077.83 12389.65 -6585.57 5992083.60 714668.98 12.00 -11057.86 100.59 MWD 19475.00 91.91 210.99 9076.87 12367,92 -6597.88 5992061.51 714657.33 12.00 -11034.31 100.73 MWD 19500.00 91.35 213.93 9076.16 12346.83 -6611.29 5992040.Q4 714644.55 12.00 -11011.22 100.85 MWD 19525.00 90.78 216.88 9075.70 12326.46 -6625.77 5992019.25 714630.67 12.00 -10988.64 100.93 MWD 19550.00 90.20 219.83 9075.48 12306.86 -6641.28 5991999.20 714615.75 12.00 -10966.65 100.98 MWD 19559.34 89.99 220.93 9075.47 12299.75 -6647.33 5991991.91 714609.92 12.00 -10958.59 101.01 MWD 19575.00 89.99 219.05 9075.47 12287.75 -6657.39 5991979.62 714600.21 12.00 -10945.03 270.00 MWD 19600.00 89.99 216.05 9075.47 12267.93 -6672.63 5991959.35 714585.57 12.00 -10922.86 270.00 MWD 19625.00 89.99 213.05 9075.48 12247.34 -6686.80 5991938.36 714572.01 12.00 -10900.12 270.00 MWD 19650.00 89.99 210.05 9075.48 12226.04 -6699.88 5991916.68 714559.57 12.00 -10876.87 270.00 MWD 19675.00 89.99 207.05 9075.48 12204.08 -6711.82 5991894.38 714548.28 12.00 -10853.17 270.00 MWD 19700.00 89.99 204.05 9075.49 12181.52 -6722.60 5991871.51 714538.17 12.00 -10829.09 270.00 MWD 19725.00 89.99 201.05 9075.49 12158.44 -6732.19 5991848.15 714529.28 12.00 -10804.69 270.00 MWD 19750.00 89.99 198.05 9075.50 12134.88 -6740.55 5991824.36 714521.61 12.00 -10780.04 270.00 MWD BP Alaska by Baker Hughes INTEQ Planning Report fBAl~t ``^ Mrer~s INTEQ Company: BP Amoco Date: 2/17/2006 Time: 16:44:37 1'oge: 4 Field: Niakuk Co-ordinate(NE) Refenace: Weil:: NK-14, True North Site: NK Main Pad Vertical (1'VD) Reference: 10:14 1 0/16/1993 10:09 59.8 Well: NK-14 Bastion (VS) Retereuce: Weil (O,OON,O.OOE,190.OOAzi) Weilpatb: PIan3, NK-14A Survey Calculation Metbod: Minimum Curvature Db: Oracle Survey MD Incl Azim Sya TVD N!S' E/1V MapN MapE . 'DIS YS TFO Toot- ft deg deg: ft ft ft ft ft deg/100ft ft" deg 19775.00 89.99 195.05 9075.50 12110.92 -6747.67 5991800.20 714515.21 12.00 -10755.21 270.00 MWD 19800.00 89.99 192.05 9075.50 12086.62 -6753.52 5991775.74 714510.07 12.00 -10730.26 270.00 MWD 19825.00 89.99 189.05 9075.51 12062.04 -6758.10 5991751.04 714506.23 12.00 -10705.26 270.00 MWD 19850.00 89.99 186.05 9075.51 12037.26 -6761.38 5991726.17 714503.68 12.00 -10680.29 270.00 MWD 19875.00 89.99 183.05 9075.51 12012.34 -6763.36 5991701.21 714502.44 12.00 -10655.40 270.01 MWD 19900.00 89.99 180.05 9075.52 11987.35 -6764.04 5991676.21 714502.50 12.00 -10630.68 270.01 MWD 19925.00 89.99 177.05 9075.52 11962.36 -6763.40 5991651.25 714503.88 12.00 -10606.18 270.01 MWD 19950.00 89.99 174.05 9075.52 11937.44 -6761.46 5991626.40 714506.55 12.00 -10581.97 270.01 MWD 19975.00 89.99 171.05 9075.52 11912.66 -6758.22 5991601.72 714510.53 12.00 -10558.13 270.01 MWD 20000.00 89.99 168.05 9075.53 11888.08 -6753.68 5991577.29 714515.79 12.00 -10534.70 270.01 MWD 20025.00 89.99 165.05 9075.53 11863.76 -6747.86 5991553.16 714522.32 12.00 -10511.77 270.01 MWD 20050.00 90.00 162.05 9075.53 11839.79 -6740.78 5991529.41 714530.11 12.00 -10489.39 270.01 MWD 20075.00 90.00 159.05 9075.53 11816.22 -6732.46 5991506.10 714539.13 12.00 -10467.63 270.01 MWD 20084.34 90.00 157.93 9075.53 11807.54 -6729.03 5991497.52 714542.80 12.00 -10459.67 270.01 MWD 20100.00 88.84 159.41 9075.69 11792.95 -6723.34 5991483.10 714548.93 12.00 -10446.29 127.80 MWD 20125.00 87.01 161.78 9076.60 11769.38 -6715.04 5991459.80 714557.92 12.00 -10424.53 127.78 MWD 20150.00 85.18 164.17 9078.30 11745.54 -6707.73 5991436.18 714565.93 12.00 -10402.31 127.70 MWD 20175.00 83.35 166.56 9080.80 11721.47 -6701.45 5991412.31 714572.92 12.00 -10379.70 127.54 MWD 20200.00 81.54 168.97 9084.09 11697.26 -6696.20 5991388.26 714578.89 12.00 -10356.77 127.30 MWD 20225.00 79.74 171.41 9088.15 11672.95 -6691.99 5991364.09 714583.81 12.00 -f0333.56 126.98 MWD 20250.00 77.97 173.87 9092.99 11648.63 -6688.85 5991339.87 714587.67 12.00 -10310.15 126.58 MWD 20275.00 76.21 176.37 9098.57 11624.35 -6686.78 5991315.67 714590.46 12.00 -10286.61 126.11 MWD 20300.00 74.48 178.90 9104.90 11600.19 -6685.77 5991291.55 714592.17 12.00 -10262.99 125.55 MWD 20325.00 72.78 181.47 9111.95 11576.21 -6685.85 5991267.58 714592.81 12.00 -10239.35 124.91 MWD 20350.00 71.11 184.10 9119.70 11552.47 -6687.00 5991243.82 714592.36 12.00 -10215.78 124.18 MWD 20375.00 69.48 186.77 9128.13 11529.04 -6689.23 5991220.33 714590.83 12.00 -10192.32 123.37 MWD 20400.00 67.89 189.50 9137.22 11505.99 -6692.52 5991197.20 714588.22 12.00 -10169.05 122.47 MWD 20425.00 66.35 192.30 9146.94 11483.38 -6696.87 5991174.46 714584.53 12.00 -10146.02 121.47 MWD 20450.00 64.86 195.16 9157.27 11461.26 -6702.27 5991152.20 714579.79 12.00 -10123.30 120.39 MWD 20475.00 63.42 198.08 9168.17 11439.71 -6708.70 5991130.47 714574.00 12.00 -10100.96 119.21 MWD 20500.00 62.05 201.08 9179.63 11418.77 -6716.14 5991109.32 714567.18 12.00 -10079.05 117.93 MWD 20525.00 60.74 204.16 9191.60 11398.52 -6724.58 5991088.83 714559.35 12.00 -10057.64 116.55 MWD 20550.00 59.51 207.31 9204.05 11378.99 -6733.99 5991069.03 714550.52 12.00 -10036.78 115.08 MWD 20575.00 58.35 210.55 9216.96 11360.25 -6744.34 5991050.00 714540.73 12.00 -10016.52 113.51 MWD 20599.48 57.30 213.79 9230.00 11342.71 -6755.37 5991032.14 714530.22 12.00 -9997.33 111.84 NK-14A 20600.00 57.28 213.86 9230.28 11342.36 -6755.61 5991031.77 714530.00 12.00 -9996.94 110.12 3.50" • a. e el it '~ ~ ~ ~~ 0 i' ~ ~ 1 ~~~ -- ._ ... .~ i ~~ fMt a ~ ( ( , ~ . ~~ ~~ -, - --= _- _ ~ :.:_ ... `--r i .- - _i ~ ~ ~ f { ~~ pp _,. _ ~ ~ ~ _~ f ~ ~ 1 ~ - .: _. ,.. ...i_.. ,. ... .. 9 gg 9R~ pp gy _p __ .........._ p..... __._. _.._ x A 2 R ~ C R A G F R g ~ ! ~ S A C 4 IL1 (•)4ww(~)vu~os \___ . ~ t ~if~F ^asss-a:ae G~EEG7.SSCI ~ R7R ~1x ~d ~ :;:;_:::a3~ i ^ iiCR6R8Rdt g 3 8E8888~858; x , d!9Eg£?1'' w~ _p 6 "S3kGi~i8 9 ~ eaessaseee ,E9 Q ~ ~ ~~_~ 8 6:888888888 65ii9 Y 9 d a-:33«___.. g ~ ~~~pF ~~~~FlFt! (~ ~ 'a ~ q~g 3 ;:~.:cS~:$ s sss?313£ .a3 ~ A:"'d8iC8~ ~ jjj~~jll11 ~ g ° p 8 i ~ ~_~ ~ iii~~iiiiGe /~ "7 d_ ' j3ec'~nFjO- Q ~ p"ta78iii:..i ~ o h a % = = li j ~ ~ 6 88 ~~ SRR~'•ati~~3 - ~ e si::ieasa=i ~ d . ~._. ~ ~ ' ~~ ~ ee8ei'.eaz52 48g g ao ~F 8 j ~t:::OYC ~ 88868zzzzz8 3683gsd8 ASg~3EiSi$ 4 ABSdBE^3 a6 s 0 0 e • • easurements are from i _~ ~ N K-14A of bag BAG 7 1/16" 5000 psi. of bag of slips Blind/Shears TOTs 2 3/8" combi ram/slips ~ 1/16" 5ooopsi of ninea _. ~ -, Mud Cross I I Mud Crosp of flow cross 7 1/16" 5000 sl of blind/shears variable bore pipe 3 1/2"-2 3/8" j _ TOTs 2 3/8" combi ram/slips ~ ~ 1/1 s" 5ooopsi of nine/slinc _. Flow Tee • • TERRIE L RUBBLE ss-sii252 257 BP EXPLORATION AK INC "Mastercard Check" PO BOX 196612 MB 7-5 ,~ ANCHORAGE, AK 99519-6612. DATE PAY TO THE ~ f~ ~` ORDER OF First National Bank Alaska Anchorage, AK 99501. ~ ~ 1 i ~ /1 n MEMO ~:L25200060~:99 L4~~~6227~~~155611' 0257 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~'~~ ~/~ -/~~ PTD# ~~~ O. ~ l Development Service Exploratory Stratigraphic Test Non-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. API No. 50- - - API number are , between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055.. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Company NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. ~Company NameZmust contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/25/06 C:\j ody\transm ittal_checkl i st ~ - WELL PERMIT CHECKL PTD#:2060310 Company B ilk Fiekt & Pool PRUDHOE BAY, BOREALIS OIL - 640130 _ _Well Name: PRUDHOE BAY UN NIA NK-14A ___Program SER ___ ___ -Well bore seg [~'~ PLORATION tALASKAI INC __ _ _ _ __ Inkial ClassRype __SER 1 WAGIN _GeoArea 890 _____ __, Unit 11650_-_____ OnlOff Shore Off .__ .Annular Disposal [~', Administration '1 Permitfee attached- - - - - - - - - - Yes 2 Lease number appropriate- Yes 3 Unique wellname and number .. - - . - - Yes ~4 Well located in a-deflnedpool- Yes ~5 Well located proper distance_from-drilling unit_boundary- - , - Yes i ~6 Well located properdistance_from-other wells_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ 7 Sufficient acreageavailable in dril_iing unit - - - - - - -- - - - - - - - - - - - - - - - - - - - - - Yes _ _ 8 If deviated, is-wellbore platincluded - - _ _ _ . _ - -------------------------- YeS _ _ _ ~9 Ope[ator only affected party - - - - Yes !10 Operator has_approprate_bond in force __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. _ _ - - Yes _ _ _ 'x,11 Permitcan be issued without conservation order_ _ - - Yes i Appr Date 12 Permitcan be issued without administ(ative approval _ - _ _ _ _ _ _ - - _ Yes - - _ _ _ RPC 311312006 i13 Can permt__be approved before 15-day_wa~_ _ _ - _ Yes _ 1,14 Well located within area and strata authorized bglnjection Order# (put.10# in.comments)_(For_ NA_ - 15 Allwells-within 114-mile area of review identified (For seNice well only) - - NA_ X16 Pre-produced injector_ duration of pre production less than_ 3 months (For service well only) NA- . ~~ ACMP_Findng of Consistency-has been issued_forthis project_ _ . NA_ . ''17 N f t AS31 05 030 ' 1 A O2 A-D) NA Engineering i__ onconven, gas con orms o u. , ), . , - - _ X118 Conductor &tnng provided NA. _ I';19 Surface casing_protects all known-USDWs - - - - - NA- _ 'I20 CMT_voladequate_to circulate on conductor & surf csg _ _ - _ - _ _ - _ - - - - - - - - - - - - - - NA. - ._ . _ x',21 CMT_vol_ adequate_to tie-in long string to surf csg_ - - NA_ - ',22 CMT will cover all known-productive horizons... Yes Adequate excess, ',23 Casing designs adequate f_or C, T, B &_permafrost- , _ _ - . _ Yes _ i24 Adequate tankage_or reserve pit - Yes CTDU. I;25 If a re-drill, has_a 10-403 for abandonment been approved Yes 2!2812006. 126 Adequatewellboreseparation_proposed Yes Appr Date 27 If diverter required, does it meet regulations- NA_ Sidetrack. WGA 311412006 128 Drilling fluid program schematic & equip list adequate- . Yes Max MW 9,6 ppg. 29 BOPES,_do they meet regulation Yes _ X130 BOPE press rating appropnate; test to-(put prig in comments)- .. Yes Test t_o 4000 psi. MSP 3393 psi, x!31 Choke manifold complieswlAPl_RP-53(May84)_ .. - Yes !i32 Work will occur without operation shutdown _ _ _ _ - - _ _ _ _ _ _ _ Yes _ ~33 Is presence-of H2$ gasprob_able - -Yes _ 200Apm on pad. Geology ~34 Mechanical condition of wells within AOR verified (FO[service well only) NA '~i35 Permitcan be issued w!o hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No- _ NA- Appr Date ~I36 Data presented on_potential overpressure zones- - RPC 311312006 ';37 Seismicanalysis_ofshollow gas zones- - _ _ . _ _ - - ~- 38 Seabed condition survey (ifoff-shore) NA Geologic Engineering Public Commissioner: Date: Commissioner. Date o sinner Date l~ • • • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Wetl History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. T nk-14apbl,tapx Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Feb 29 15:04:15 2008 Reel Header Service name .............LISTPE Date . ...................08/02/29 Origin ...................STS Reel Name. .... ........UNKNOWN continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS writing Library. Tape Header Service name .............LISTPE Date . ...................08/02/29 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing scientific Technical services Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: NK-14A PB1 API NUMBER: 500292266870 OPERATOR: BP Exploration (Alaska) Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 29-FEB-08 70B DATA MWD RUN 3 MWD RUN 4 MWD RUN 5 Job NUMBER: w-0004332571 w-0004332571 w-0004332571 LOGGING ENGINEER: B. JAHN B. JAHN B. JAHN OPERATOR WITNESS: R. BORDES /B R. BORDES/B. B. LAULE / R MWD RUN 6 MAD RUN 6 Job NUMBER: W-0004332571 W-0004332571 LOGGING ENGINEER: B. JAHN B. JAHN OPERATOR WITNESS: B, LAULE / R B. LAULE / R SURFACE LOCATION SECTION: 36 TOWNSHIP: 12N RANGE: 15E FNL: FSL: 1358 FEL: 944 FWL: Page 1 ~(xo"~r #~~~ r 1 • • nk-14apbl.tapx ELEVATION (FT FROM MSL O) KELLY BUSHING: 59.80 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 4.125 7.000 18215.0 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. THIS WELL WAS DRILLED FROM A WHIPSTOCK, THE TOP OF WHICH WAS AT 18215'MD IN THE ORIGINAL NK-14 WELLBORE. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. THE WHIPSTOCK WAS POSITIONED AT 18240'MD, BUT NO MILLING PROGRESS WAS MADE. NO DATA ARE PRESENTED. 5. MWD RUN 2 CONMPRISED DIRECTIONAL AND PCG. A SECOND WHIPSTOCK WAS SET, AT 18215'MD. THE WINDOW WAS MILLED AND A BIT OF RAT HOLE WAS DRILLED. NO DATA ARE PRESENTED. 6. MWD RUN 3 COMPRISED DIRECTIONAL AND PCG. 7. MWD RUNS 4-6 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). UPHOLE DATA GAPS WERE FILLED IN WITH MAD PASS DATA ACQUIRED ON A SHORT TRIP DURING MWD RUN 4. THESE MAD DATA WERE MERGED WITH RUN 4 MWD DATA. MAD PASS DATA WERE ALSO ACQUIRED AFTER REACHING FINAL TD ON MWD RUN 6. THESE MAD DATA ARE PRESENTED SEPARATELY. 8. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO AN ATLAS GAMMA RAY RUN IN THE NK-14 WELLBORE ON 20 MAY 1996. THESE LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 27 NOVEMBER 2007, PER DAVE BOYER (BP). LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THESE SHIFTED DATA ARE THE PDCL FOR NK-14A. 9. MWD RUNS 1-6 REPRESENT WELL NK-14A PB1 WITH API#: Page 2 nk-14apbl.tapx 50-029-22668-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 20541'MD/9208'TVDSS. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT = SMOOTHED RATE OF RUNNING SPEED FOR MAD PASS. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED. PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. File Header Service name... .......STSLIB.001 service Sub Level Name... version Number.. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR FET RPX RPS RPM RPD ROP 1 clipped curves; all bit runs merged. .5000 START DEPTH 18113.0 18221.0 18221.0 18221.0 18221.0 18221.0 18240.0 STOP DEPTH 20497.0 20510.0 20510.0 20510.0 20510.0 20510.0 20541.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT BASELINE DEPTH GR 18113.0 18115.0 18132.5 18134.5 18136.5 18140.0 18141.0 18144.5 18149.5 18149.5 18153.0 18152.0 18157.5 18157.5 18161.5 18162.5 18173.5 18174.0 18176.0 18175.5 18177.0 18176.5 UNSHIFTED DEPTH --------- Page 3 nk-14apbl.tapx 18179.5 18180.0 18181.0 18182.0 18183.5 18184.0 20541.0 20541.5 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MwD 3 18115.0 18540.0 MWD 4 18540.0 20100.0 MWD 5 20100.0 20384.0 MwD 6 20384.0 20541.5 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~iny Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 18113 20541 19327 4857 18113 20541 RPD MWD OHMM 0.61 1144.18 10.8826 4579 18221 20510 RPM MWD OHMM 0.66 29.46 9.25811 4579 18221 20510 RPS MWD OHMM 0.68 19.98 8.90724 4579 18221 20510 RPx MwD OHMM 0.66 16.13 8.43707 4579 18221 20510 FET MWD HOUR 0.2159 30.43 4.67152 4579 18221 20510 GR MwD API 22.41 1387.66 73.8343 4722 18113 20497 ROP MWD FT/H 0.41 470.37 87.03 4603 18240 20541 First Reading For Entire File..........18113 Last Reading For Entire File...........20541 File Trailer Service name... .......STSLIB.001 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 Page 4 nk-14apbl.tapx File Type ................Lo Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type.. ............LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 18201.0 20466.0 FET 18206.5 20479.5 RPS 18206.5 20479.5 RPM 18206.5 20479.5 RPD 18206.5 20479.5 RPx 18206.5 20479.5 RAT 18242.0 20510.5 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MwD 6 1 18201.5 20541.5 REMARKS: MERGED MAD PASS. Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MAD OHMM 4 1 68 4 2 RPM MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPX MAD OHMM 4 1 68 16 5 FET MAD HOUR 4 1 68 20 6 GR MAD API 4 1 68 24 7 RAT MAD FT/H 4 1 68 28 8 Page 5 nk-14apbl.tapx First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 18201 20510.5 19355.8 4620 18201 20510.5 RPD MAD OHMM 0.03 2000 21.1569 4547 18206.5 20479.5 RPM MAD OHMM 0.11 2000 19.0463 4547 18206.5 20479.5 RPS MAD OHMM 0.39 2000 10.1644 4547 18206.5 20479.5 RPX MAD OHMM 0.1 2000 9.72588 4547 18206.5 20479.5 FET MAD HOUR 2.59 135.37 84.4072 4547 18206.5 20479.5 GR MAD API 25.36 475.69 67.8804 4531 18201 20466 RAT MAD FT/H 52.78 997.17 858.78 4538 18242 20510.5 First Reading For Entire File..........18201 Last Reading For Entire File...........20510.5 File Trailer Service name... .......STSLIB.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 18115.0 18510.0 ROP 18240.5 18540.0 LOG HEADER DATA DATE LOGGED: 24-APR-06 SOFTWARE SURFACE SOFTWA RE VERSION: Insite DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 18540.0 TOP LOG INTERVAL (FT): 18215.0 Page 6 A • nk-14apbl.tapx BOTTOM LOG INTERVAL (FT): 18540.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 67.0 MAXIMUM ANGLE: $$.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PCG Natural gamma ray TLG015 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 4.125 18215.0 F1oPro 9.00 65.0 9.0 74000 5.6 .000 .000 .000 .000 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 GR MwD030 API 4 1 68 4 2 ROP MWD030 FT/H 4 1 68 8 3 Name Service Unit Min Max Mean Nsam DEPT FT 18115 18540 18327.5 851 GR MWD030 API 33.42 1387.66 137.935 744 ROP MWD030 FT/H 0.41 139.81 94.996 600 Page 7 .0 167.0 .0 .0 First Reading 18115 18115 18240.5 Last Reading 18540 18510 18540 nk-14apbl.tapx First Reading For Entire File..........18115 Last Reading For Entire File...........18540 File Trailer service name... .......STSLIB.003 service Sub Level~Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLI6.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5TSL26.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 18221.5 20069.0 RPS 18221.5 20069.0 RPM 18221.5 20069.0 RPx 18221.5 20069.0 RPD 18221.5 20069.0 GR 18510.5 20056.5 ROP 18540.5 20100.0 LOG HEADER DATA DATE LOGGED: 27-APR-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 20100.0 TOP LOG INTERVAL (FT): 18540.0 BOTTOM LOG INTERVAL (FT): 20100.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 81.9 MAXIMUM ANGLE: 95.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER Page 8 ~ ~ nk-14apbl.tapx GM Dual GR 78005 EWR4 ELECTROMAG. RESIS. 4 78005 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): ,0 MUD PH: $,6 MUD CHLORIDES (PPM): 78000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .075 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .030 167.0 MUD FILTRATE AT MT: .075 65.0 MUD CAKE AT MT: .065 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service Order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 oHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 GR MwD040 API 4 1 68 24 7 ROP MWD040 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 18221.5 20100 19160.8 3758 18221.5 20100 RPD MWD040 OHMM 0.61 1144.18 11.1517 3696 18221.5 20069 RPM MWD040 OHMM 0.66 15.88 9.24692 3696 18221.5 20069 RPS MWD040 OHMM 0.68 15.2 8.93217 3696 18221.5 20069 RPX MWD040 OHMM 0.66 16.13 8.50734 3696 18221.5 20069 Page 9 i • nk-14apbl.tapx FET MWD040 HOUR 0.2159 30.43 4.69703 3696 18221.5 GR MWD040 API 24.16 84.87 54.378 3093 18510.5 ROP MWD040 FT/H 0.68 470.37 98.9417 3120 18540.5 First Reading For Entire File ..........18221.5 Last Reading For Entire File. ..........20100 File Trailer Service name... .......STSLI6.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File TyC~e ................L0 Next Fite Name...........STSLIB.005 Physical EOF File Header Service name... .......STSL26.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 20057.0 20341.0 RPx 20069.5 20353.0 RPS 20069.5 20353.0 FET 20069.5 20353.0 RPM 20069.5 20353.0 RPD 20069.5 20353.0 oP 20100.5 20384.0 $ LOG HEADER DATA DATE LOGGED: 29-APR-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 20384.0 TOP LOG INTERVAL (FT): 20100.0 BOTTOM LOG INTERVAL (FT): 20384.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 67.9 MAXIMUM ANGLE: 80.7 Page 10 20069 20056.5 20100 r ~ nk-14apbl.tapx TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 78005 EWR4 ELECTROMAG. RESIS. 4 78005 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (5): ,0 MUD PH: $,6 MUD CHLORIDES (PPM): 78000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .080 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .030 167.4 MUD FILTRATE AT MT: .080 65.0 MUD CAKE AT MT: .060 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................Down optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD050 OHMM 4 1 68 4 2 RPM MWD050 OHMM 4 1 68 8 3 RPS MWD050 oHMM 4 1 68 12 4 RPX MWD050 OHMM 4 1 68 16 5 FET MwD050 HOUR 4 1 68 20 6 GR MWD050 API 4 1 68 24 7 ROP MwD050 FT/H 4 1 68 28 8 First Name Service Unit Min Max Mean Nsam Reading DEPT FT 20057 20384 20220.5 655 20057 RPD MWD050 OHMM 6.3 19.32 11.4547 568 20069.5 Page 11 Last Reading 20384 20353 i !~ nk-14apbl.tapx RPM MwD050 OHMM 5.12 16.63 10.1714 568 20069.5 20353 RPS MWD050 OHMM 4.88 15.67 9.81257 568 20069.5 20353 RPX MWD050 OHMM 4.45 13.76 9.12694 568 20069.5 20353 FET MwD050 HOUR 0.69 24.32 4.78019 568 20069.5 20353 GR MwD050 API 22.41 106.42 65.6308 569 20057 20341 ROP MWD050 FT/H 12.17 220.84 40.8372 568 20100.5 20384 First Reading For Entire File..........20057 Last Reading For Entire File...........20384 File Trailer Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSL26.006 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 20341.5 20497.5 RPS 20353.5 20510.5 RPD 20353.5 20510.5 FET 20353.5 20510.5 RPx 20353.5 20510.5 RPM 20353.5 20510.5 ROP 20384.5 20541.5 LOG HEADER DATA DATE LOGGED; 30-APR-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 20541.0 TOP LOG INTERVAL (FT): 20384.0 BOTTOM LOG INTERVAL (FT): 20541.0 BIT ROTATING SPEED (RPM): Page 12 nk-14apbl.tapx HOLE INCLINATION (DEG MINIMUM ANGLE: 67.1 MAXIMUM ANGLE: 72,1 TOOL STRING (TOP TO VENDOR TOOL CODE GM EWR4 BOTTOM) TOOL TYPE DUaI GR ELECTROMAG. RESIS. 4 TOOL NUMBER 78005 78005 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 LOg~ing Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 4.125 18215.0 Flo Pro 9.00 45.0 8.6 76000 6.0 .080 65.0 .030 167.7 .080 65.0 .060 65.0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD060 OHMM 4 1 68 4 2 RPM MWD060 OHMM 4 1 68 8 3 RPS MWD060 OHMM 4 1 68 12 4 RPX MWD060 OHMM 4 1 68 16 5 FET MWD060 HOUR 4 1 68 20 6 GR MwD060 API 4 1 68 24 7 ROP MwD060 FT/H 4 1 68 28 8 First Last Page 13 ~ ~ nk-14apbl.tapx Name service unit Min Max Mean Nsam Reading Reading DEPT FT 20341.5 20541.5 20441.5 401 20341.5 20541.5 RPD MWD060 OHMM 3.58 11.79 6.6947 315 20353.5 20510.5 RPM MWD060 OHMM 3.51 29.46 7.74267 315 20353.5 20510.5 RPS MWD060 OHMM 3.29 19.98 6.98225 315 20353.5 20510.5 RPX MWD060 OHMM 3.16 10.15 6.36857 315 20353.5 20510.5 FET MWD060 HOUR 0.72 18.16 4.17625 315 20353.5 20510.5 GR MWD060 API 79.2 268.02 128.45 313 20341.5 20497.5 ROP MWD060 FT/H 0.76 64.84 37.1677 315 20384.5 20541.5 First Reading For Entire File..........20341 Last Reading For Entire File...........20541 File Trailer Service name... .......STSLI6.006 service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.007 Physical EOF File Header Service name... .......STSLI6.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......sTSLI6.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD curves and log header data DEPTH INCREMENT: .5000 MAD RUN NUMBER: 6 MAD PASS NUMBER: 1 FILE SUMMARY for each pass of each run in separate files. VENDOR TOOL CODE START DEPTH STOP DEPTH GR 18201.5 20466.5 FET 18207.0 20480.0 RPx 18207.0 20480.0 RPS 18207.0 20480.0 RPM 18207.0 20480.0 RPD 18207.0 20480.0 RAT 18242.5 20511.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): Page 14 30-APR-06 Insite 4.3 Memory TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: nk-14apbl.tapx 20541.0 18201.0 20541.0 67.1 72.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR EWR4 ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: ' MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 TOOL NUMBER 78005 78005 4.125 18215.0 Flo Pro 9.00 45.0 8.6 76000 6.0 .080 65.0 .030 167.7 .080 65.0 .060 65.0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MAD61 OHMM 4 1 68 4 2 RPM MAD61 OHMM 4 1 68 8 3 RPS MAD61 OHMM 4 1 68 12 4 RPX MAD061 OHMM 4 1 68 16 5 FET MAD061 HOUR 4 1 68 20 6 GR MAD061 API 4 1 68 24 7 RAT MAD061 FT/H 4 1 68 28 8 Page 15 ~ ~ nk-14apbl.tapx First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 18201.5 20511 19356.3 4620 18201.5 20511 RPD MAD61 OHMM 0.03 2000 21.1569 4547 18207 20480 RPM MAD61 OHMM 0.11 2000 19.0463 4547 18207 20480 RPS MAD61 OHMM 0.39 2000 10.1644 4547 18207 20480 RPX MAD061 OHMM 0.1 2000 9.72588 4547 18207 20480 FET MAD061 HOUR 2.59 135.37 84.4072 4547 18207 20480 GR MAD061 API 25.36 475.69 67.8804 4531 18201.5 20466.5 RAT MAD061 FT/H 52.78 997.17 858.78 4538 18242.5 20511 First Reading For Entire File..........18201.5 Last Reading For Entire File...........20511 File Trailer Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.008 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................08/02/29 Origin ...................STs Tape Name. .... ........UNKNOWN continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Reel Trailer Service name .............LISTPE Date . ...................08/02/29 Ori9in ...................STS Reel Name. .... ........UNKNOWN continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Physical EOF Physical EOF Library. scientific Technical services Library. scientific Technical services End Of LIS File Page 16 ~ ~ nk-14apbl.tapx Page 17 • nk-14a.tapx Sperry-Sun Drillin Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Feb 29 16:16:02 2008 Reel Header Service name .............LISTPE Date . ...................08/02/29 Origin ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. scientific Technical services Tape Header Service name .............LISTPE Date . ...................08/02/29 Origin... .. ...............STS Tape Name. .... ........UNKNOWN continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS writing Library. scientific Technical services Physical EOF comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: NK-14A API NUMBER: 500292266801 OPERATOR: BP Exploration (Alaska) Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 29-FEB-08 JOB DATA MWD RUN 3 MWD RUN 4 MWD RUN 7 JOB NUMBER: W-0004332571 W-0004332571 W-0004332571 LOGGING ENGINEER: B. JAHN B. JAHN B. JAHN OPERATOR WITNESS: R. BORDES /B R. BORDES/B. B. LAULE / R MWD RUN 8 MAD RUN 8 JOB NUMBER: W-0004332571 W-0004332571 LOGGING ENGINEER: B. JAHN B. JAHN OPERATOR WITNESS: R. WHITLOW/J R. WHITLOW/J SURFACE LOCATION SECTION: 36 TOWNSHIP: 12N RANGE: 15E FNL: FSL: 1358 FEL: 944 FWL: Page 1 ~ UCH ` ~? l ~* l(p pub ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: nk-14a.tapx 59.80 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 4.125 7.000 18215.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS). 3. THIS WELL WAS EFFECTED BY MEANS OF AN OPEN-HOLE SIDETRACK IN THE NK-14A PB1 WELLBORE, EXITING AT 19150'MD. THIS WAS MWD RUN 7. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND NATURAL GAMMA RAY (PCG) UTILIZING SCINTILLATION DETECTORS. THIS WHIPSTOCK WAS POSITIONED AT 18240'MD, BUT NO MILLING PROGRESS WAS MADE. NO DATA ARE PRESENTED. 5. MWD RUN 2 CONMPRISED DIRECTIONAL AND PCG. A SECOND WHIPSTOCK WAS SET, AT 18215'MD. THE WINDOW WAS MILLED AND A BIT OF RAT HOLE WAS DRILLED. NO DATA ARE PRESENTED. 6. MWD RUNS 3,7 COMPRISED DIRECTIONAL AND PCG. 7. MWD RUNS 4,8 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (GM) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MAD PASS DATA WERE ACQUIRED AFTER REACHING FINAL TD ON MWD RUN 8. THESE MAD DATA ARE PRESENTED SEPARATELY. 8. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO AN ATLAS GAMMA RAY RUN IN THE NK-14 WELLBORE ON 20 MAY 1996. THESE LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 27 NOVEMBER 2007, PER DAVE BOYER (BP). LOG HEADER DATA RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THESE SHIFTED DATA ARE THE PDCL FOR NK-14A. 9. MWD RUNS 1-4,7,8 REPRESENT WELL NK-14A WITH API#: 50-029-22668-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 19660'MD/9012'TVDSS. Page 2 nk-14a.tapx SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT = SMOOTHED RATE OF RUNNING SPEED FOR MAD PASS. SGRC = SMOOTHED GAMMA RAY COMBINED. SGRD = SMOOTHED NATURAL GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. File Header Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSL26.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR FET RPM RPD RPS RPX ROP 1 clipped curves; all bit runs merged. .5000 START DEPTH 18113.0 18221.0 18221.0 18221.0 18221.0 18221.0 18240.0 STOP DEPTH 19616.0 19629.0 19629.0 19629.0 19629.0 19629.0 19660.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 18113.0 18115.0 18132.5 18134.5 18136.5 18140.0 18141.0 18144.5 18149.5 18149.5 18153.0 18152.0 18157.5 18157.5 18161.5 18162.5 18173.5 18174.0 18176.0 18175.5 18177.0 18176.5 18179.5 18180.0 18181.0 18182.0 18183.5 18184.0 Page 3 20541.0 20541.5 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 3 MWD 4 MWD 7 MWD 8 REMARKS: MERGED MAIN PA55. nk-14a.tapx MERGE TOP 18115.0 18539.5 19159.0 19190.0 MERGE BASE 18539.5 19159.0 19190.0 19660.5 Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HOUR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 18113 19660 18886.5 3095 18113 19660 RPD MWD OHMM 0.61 1144.18 11.6493 2817 18221 19629 RPM MWD OHMM 0.66 79.49 9.7054 2817 18221 19629 RPS MWD OHMM 0.68 31.4 9.18075 2817 18221 19629 RPX MWD OHMM 0.66 21.75 8.66886 2817 18221 19629 FET MWD HOUR 0.23 30.43 6.29542 2817 18221 19629 GR MWD API 30.61 1387.66 76.6858 2960 18113 19616 ROP MWD FT/H 0.1 470.37 103.597 2841 18240 19660 First Reading For Entire File..........18113 Last Reading For Entire File...........19660 File Trailer Service name... .......STSLIB.001 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.002 Page 4 • • nk-14a.tapx Physical EOF File Header Service name... .......STSLIB.002 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 19006.5 19618.5 RPx 19011.5 19633.0 RPM 19011.5 19633.0 FET 19011.5 19633.0 RPD 19011.5 19633.0 RPS 19011.5 19633.0 $ T 19054.0 19659.5 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MwD 8 1 19007.0 19660.5 REMARKS: MERGED MAD PASS. Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 RPD MAD OHMM 4 1 68 4 2 RPM MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPX MAD OHMM 4 1 68 16 5 FET MAD HOUR 4 1 68 20 6 GR MAD API 4 1 68 24 7 RAT MAD FT/H 4 1 68 28 8 Page 5 ~ ~ nk-14a.tapx First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 19006.5 19659.5 19333 1307 19006.5 19659.5 RPD MAD OHMM 3.79 62.42 9.9117 1244 19011.5 19633 RPM MAD OHMM 2.76 49.29 9.4952 1244 19011.5 19633 RPS MAD OHMM 2.52 30.03 8.45187 1244 19011.5 19633 RPX MAD OHMM 2.02 19.45 7.32695 1244 19011.5 19633 FET MAD HOUR 1.98 158.08 44.5478 1244 19011.5 19633 GR MAD API 22.31 283.27 55.4722 1225 19006.5 19618.5 RAT MAD FT/H 531 854 817.672 1212 19054 19659.5 First Reading For Entire File..........19006.5 Last Reading For Entire File...........19659.5 File Trailer Service name... .......STSLIB.002 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.003 Physical EOF File Header service name... .......STSLIB.003 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 18115.0 18510.0 ROP 18240.5 18539.5 LOG HEADER DATA DATE LOGGED: 24-APR-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 18540.0 TOP LOG INTERVAL (FT): 18215.0 BOTTOM LOG INTERVAL (FT): 18540.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG Page 6 nk-14a.tapx MINIMUM ANGLE: 67.0 MAXIMUM ANGLE: $$,2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $CG Natural gamma ray TLG015 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS MUD TYPE: F1oPro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 45.0 MUD PH: 9,0 MUD CHLORIDES (PPM): 74000 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 167.0 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MwD030 API 4 1 68 4 2 ROP MwD030 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 18115 18539.5 18327.3 850 18115 18539.5 GR MWD030 API 33.42 1387.66 137.935 744 18115 18510 ROP MWD030 FT/H 8.16 139.81 95.1539 599 18240.5 18539.5 First Reading For Entire File..........18115 Page 7 nk-14a.tapx Last Reading For Entire File...........18539.5 File Trailer Service name... .......STSLIB.003 Service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................L0 Next File Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLI6.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD curves and log BIT RUN NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH FET 18221.5 19159.0 RPM 18221.5 19159.0 RPX 18221.5 19159.0 RPD 18221.5 19159.0 RPS 18221.5 19159.0 GR 18510.5 19140.0 ROP 18540.0 19140.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR EWR4 ELECTROMAG. RESIS. 4 Page 8 • header data for each bit run in separate files. 4 .5000 27-APR-06 Insite 4.3 Memory 19150.0 18540.0 19150.0 81.9 95.9 TOOL NUMBER 78005 178425 • • nk-14a.tapx BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT ): 18215.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 45.0 MUD PH: 8,6 MUD CHLORIDES (PPM): 78000 FLUID LOSS (C3): 6.2 RESISTIVITY (OHMM) AT TEMP ERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .075 65.0 MUD AT MAX CIRCULATING TERMPERATURE : .030 167.0 MUD FILTRATE AT MT: .075 65.0 MUD CAKE AT MT: .065 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..... .....0 Data Specification Block Type .....0 Logging Direction ............ .....DOwn Optical log depth units...... .....Feet Data Reference Point ......... .....undefin ed Frame Spacing....... ....... .....60 .lIN Max frames per record ........ .....undefin ed Absent value ................. .....-999 Depth units. .. .. ..... Datum specification Block sub -type...0 Name service order units size N sam Rep code offset Channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 OHMM 4 1 68 12 4 RPX MwD040 OHMM 4 1 68 16 5 FET MwD040 HOUR 4 1 68 20 6 GR MWD040 API 4 1 68 24 7 ROP MwD040 FT/H 4 1 68 28 8 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 18221.5 19159 18690.3 1876 18221.5 19159 RPD MWD040 OHMM 0.61 1144.18 11.8957 1876 18221.5 19159 RPM MwD040 OHMM 0.66 15.88 8.99853 1876 18221.5 19159 RPS MWD040 OHMM 0.68 15.2 8.75457 1876 18221.5 19159 RPX MWD040 OHMM 0.66 16.13 8.35468 1876 18221.5 19159 FET MwD040 HOUR 0.2445 30.43 8.30112 1876 18221.5 19159 GR MWD040 API 40.17 84.87 59.5101 1260 18510.5 19140 ROP MWD040 FT/H 0.41 470.37 95.9192 1201 18540 19140 Page 9 nk-14a.tapx First Reading For Entire File..........18221.5 Last Reading For Entire File...........19159 File Trailer Service name... .......STSLIB.004 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................LO Next File Name...........5T5LIB.005 Physical EOF File Header Service name... .......STSLI6.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 19140.5 CROP 19140.5 LOG HEADER DATA DATE LOGGED; SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO VENDOR TOOL CODE PCG STOP DEPTH 19160.5 19190.0 BOTTOM) TOOL TYPE Natural gamma ray BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): O1-MAY-06 Insite 4.3 Memory 19190.0 19150.0 19190.0 89.0 89.0 TOOL NUMBER TLG033 4.125 Page 10 • nk-14a.tapx DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): ,0 MUD PH: $,g MUD CHLORIDES (PPM): 76000 FLUID LOSS (C3): 4.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .000 .O MUD AT MAX CIRCULATING TERMPERATURE: .000 153.7 MUD FILTRATE AT MT: .000 .O MUD CAKE AT MT: .000 .O NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. .. .. ..... patum Specification Block sub-type...0 Name service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD070 API 4 1 68 4 2 ROP MwD070 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 19140.5 19190 19165.3 100 19140.5 19190 GR MwD070 API 45.76 64.95 54.648 41 19140.5 19160.5 ROP MWD070 FT/H 0.1 74.56 14.7534 100 19140.5 19190 First Reading For Entire File..........19140.5 Last Reading For Entire File...........19190 Fi 1 e Trai 1 er Service name... .......STSLIB.005 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................Lo Page 11 • nk-14a.tapx Next File Name...........STSLIB.006 Physical EOF File Header Service name... .......STSLIB.006 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLI6.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPS 19159.5 19629.5 RPD 19159.5 19629.5 FET 19159.5 19629.5 RPx 19159.5 19629.5 RPM 19159.5 19629.5 GR 19161.0 19616.5 ROP 19190.5 19660.5 LOG HEADER DATA DATE LOGGED: 03-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 19660.0 TOP LOG INTERVAL (FT): 19190.0 BOTTOM LOG INTERVAL (FT): 19660.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 89.0 MAXIMUM ANGLE: 103.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 82758 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 Page 12 • nk-14a.tapx MUD CHLORIDES (PPM): 78000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .080 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .030 167.7 MUD FILTRATE AT MT: .080 68.0 MUD CAKE AT MT: .060 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format specification Record Data Record Type... ..........0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum Specification Block sub-type...0 Name Service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD080 OHMM 4 1 68 4 2 RPM MWD080 OHMM 4 1 68 8 3 RPS MWD080 OHMM 4 1 68 12 4 RPX MwD080 OHMM 4 1 68 16 5 FET MwD080 HOUR 4 1 68 20 6 GR MwD080 API 4 1 68 24 7 ROP MwD080 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 19159.5 19660.5 19410 1003 19159.5 19660.5 RPD MwD080 OHMM 4.42 69.27 11.1581 941 19159.5 19629.5 RPM MwD080 OHMM 4.2 79.49 11.1146 941 19159.5 19629.5 RPS MWD080 OHMM 4.07 31.4 10.0304 941 19159.5 19629.5 RPX MWD080 OHMM 3.87 21.75 9.2952 941 19159.5 19629.5 FET MwD080 HOUR 0.23 28.95 2.29682 941 19159.5 19629.5 GR MwD080 API 30.61 248.17 51.3826 912 19161 19616.5 ROP MWD080 FT/H 0.38 294.67 128.211 941 19190.5 19660.5 First Reading For Entire File..........19159.5 Last Reading For Entire File...........19660.5 File Trailer service name... .......STSLIg.006 service sub Level Name... version Number...........1.0.0 Page 13 nk-14a.tapx Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.007 Physical EOF File Header Service name... .......STSLIB.007 service sub Level Name... version Number. ........1.0.0 Date of Generation.......08/02/29 Maximum Physical Record..65535 File Type. ............LO Previous Fiie Name.......STSLI6,006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD curves and log header data DEPTH INCREMENT: .5000 MAD RUN NUMBER: 8 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 19007.0 RPD 19012.0 RPM 19012.0 RPx 19012.0 RPS 19012.0 FET 19012.0 T 19054.5 ~ for each pass of each run in separate files. LOG HEADER DATA STOP DEPTH 19619.0 19633.5 19633.5 19633.5 19633.5 19633.5 19660.0 DATE LOGGED: 03-MAY-06 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 19660.0 TOP LOG INTERVAL (FT): 19007.0 BOTTOM LOG INTERVAL (FT): 19660.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 89.0 MAXIMUM ANGLE: 103.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GM Dual GR 82758 EWR4 ELECTROMAG. RESIS. 4 178425 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 4.125 DRILLER'S CASING DEPTH (FT): 18215.0 BOREHOLE CONDITIONS Page 14 • nk-14a.tapx MUD TYPE: Flo Pro MUD DENSITY (LB/G): 9.00 MUD VISCOSITY (S): 65.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 78000 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEG F) MUD AT MEASURED TEMPERATURE (MT): .080 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .030 167.7 MUD FILTRATE AT MT: .080 68.0 MUD CAKE AT MT: .060 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type... .. .......0 Data specification Block Type.....0 Logging Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. .. .. ..... Datum specification Block sub-type...0 Name service order units size Nsam Rep Code offset channel DEPT FT 4 1 68 0 1 RPD MAD081 OHMM 4 1 68 4 2 RPM MAD081 OHMM 4 1 68 8 3 RPS MAD081 OHMM 4 1 68 12 4 RPX MAD081 OHMM 4 1 68 16 5 FET MAD081 HOUR 4 1 68 20 6 GR MAD081 API 4 1 68 24 7 RAT MAD081 FT/H 4 1 68 28 8 First Last Name service unit Min Max Mean Nsam Reading Reading DEPT FT 19007 19660 19333.5 1307 19007 19660 RPD MAD081 OHMM 3.79 62.42 9.9117 1244 19012 19633.5 RPM MAD081 OHMM 2.76 49.29 9.4952 1244 19012 19633.5 RPS MAD081 OHMM 2.52 30.03 8.45187 1244 19012 19633.5 RPX MAD081 OHMM 2.02 19.45 7.32695 1244 19012 19633.5 FET MAD081 HOUR 1.98 158.08 44.5478 1244 19012 19633.5 GR MAD081 API 22.31 283.27 55.4722 1225 19007 19619 RAT MAD081 FT/H 531 854 817.672 1212 19054.5 19660 First Reading For Entire File..........19007 Last Reading For Entire File...........19660 Page 15 nk-14a.tapx File Trailer Service name... .......STSLI6.007 service sub Level Name... version Number. ........1.0.0 gate of Generation.......08/02/29 Maximum Physical Record..65535 File Type ................Lo Next File Name...........STSLIB.008 Physical EOF Tape Trailer Service name .............LISTPE gate . ...................08/02/29 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN ~omments .................STS LIS writing Library. Reel Trailer Service name .............LISTPE gate . ...................08/02/29 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Physical EOF End Of LIS File scientific Technical services Scientific Technical Services Page 16