Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
206-186
~ ct Well Histo File Cov~er Pa e Image P o~e ry J XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~ ~- 1~~ Well History File Identifier Or anizing (done) 9 ^ Two-sided III IIII II II III II III ^ Rescan Needed III II'I II II II II) III RESCAN DI AL DATA OVERSIZED (Scannable) ri~COlor Items: Diskettes, No. ~ ^ Maps:. ~T ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Mana Date: ~S~ ~ Pro "ect Proo~ng J II I II'I II I I III I( III ,n^ BY: Maria Date: ~ O /s/ r~~ ` tion P i 1"'~ x 30 =~+ ~ = TOTAL PAGES ~~ ~ repara ng Scann _ ., (Count does n~t include cover sheet) BY: / Maria Date: ' / ~ ~~ ~ /s/ ~ Production Scanning Stage 1 Page Count from Scanned File: ~(Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~~YES NO BY: Maria Date: //'~ ~ 9 /s/ ~/~ ~ (1/ ` Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Scanning is complete at this point unless rescanning is required. /s/ II) II'lll IIIII II III ReScanned II I(I'I II I I II) I I III BY: Maria Date: ~S~ Comments about this file: Quality Checked (I ( II'I I~ (II ~III ~II 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA RECEIVED AL,oKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS JAN 3 0 2014 AOGCC 1. Operations Performed: ❑Abandon \l/Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ❑Alter Casing ®Pull Tubing 0 Stimulate-Frac 0 Waiver 0 Other ❑Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic • 206-186 3. Address: ®Development 0 Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 d 50.029-20454-02-00 7. Property Designation(Lease Number): 8. Well Name and Number: S ADL 028308&028307 • PBU 02-18B 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): r Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. Present well condition summary: Total depth: measured • 12205' feet Plugs:(measured) None feet true vertical 8834' feet Junk:(measured) None feet Effective depth: measured . 12171' feet Packer: (measured) 9506';9962' feet true vertical 8832' feet Packer: (true vertical) 8143';8546' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1530 520 Surface 2697' 13-3/8" 2697' 2697' 4930 2670 Intermediate 10010' 9-5/8" 10010' 8589' 6870 4760 Production Liner 2263' 3-1/2"x 3-3/16"x 2-7/8" 9942'- 12205' 8529'-8834' SCANNED JUL 1 6 2014 Perforation Depth: Measured Depth: 10650'- 12110' feet True Vertical Depth: 8834'-8829' feet Tubing(size,grade,measured and true vertical depth): 4-1/2", 12.6# 13Cr85/L-80 10010' 8589' Packers and SSSV(type,measured and true vertical depth): 9-5/8"x 4-1/2"HES TNT Packer; 9506'; 8143'; 9-5/8"x 4-1/2"Baker SAB Packer 9962' 8546' 12.Stimulation or cement squeeze summary: Intervals treated(measured): RBDMdk MAY 17 2014 Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 445 39345 34 1200 940 Subsequent to operation: 0 0 0 450 0 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic IN Development 0 Service ®Daily Report of Well Operations ®Well Schematic Diagram 16. Well Status after work: •®Oil 0 Gas 0 WDSPL 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: Sean McLaughlin,564-4387 Email: Sean.McLaughlin@bp.com N/A Printed Name: Joe Lastu Title: Drilling Technologist Signature: jPhone: 564-4061 Date: I/504- —, _ Form 10-404 Revised 10/2012 v��r, S/Z Z/i 1- ®�., Submit Original Only 02-18B, Well History (Pre Rig Workover) Date Summary 10/14/13 T/I/O=SSV/200/300,Temp=Sl. PPPOT-T(PASS), PPPOT-IC (PASS). Pre RWO. PPPOT-T: Stung into test port(100 psi), bled to 0 psi. Functioned LDS, all moved freely(1"). Single port, unable to pump through void. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(0+ psi), bled to 0 psi. Functioned LDS, all moved freely(1"). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. 10/20/13 T/I/O = 180/180/300. Temp= SI. WHPs (TBG & IA FL full-bore). No AL. TBG FL near surface, IA FL @ surface. SV, WV, SSV=C. MV=0. IA, OA=OTG. 2100. 10/21/13 T/I/0=120/150/330 Temp=SI CMIT-TxIA**PASSED**to 3000 psi, MIT-OA**PASSED**to 2000 psi RWO prep) Pumped 12.5 bbls 32*diesel down Tbg to reach test pressure for CMIT-TxIA. 1st 15 minutes T/IA lost 71/50 psi. 2nd 15 minutes T/IA lost 25/25 psi.Total T/IA loss in 30 minutes=96/75 psi. Bled TxIAP(-11 bbls). Pumped 5.3 bbls 32*diesel down OA to reach test pressure. 1st 15 minutes OA lost 44 psi. 2nd 15 minutes OA lost 21 psi.Total loss in 30 minutes=65 psi. Bled OAP(--3 bbls). FWHP's=460/480/380 SV, WV, SSV=SI MV=0 IA&OA= OTG. 10/30/13 DRIFT W/EMPTY 10'x 2.50" DUMP BAILER, K-JAR, 2.25" CENT TO XX PLUG @ 9951' SLM/9961' MD. 10/31/13 DUMP BAIL 10'SLUGGITS @ 9951'SLM/9961'MD TO 9,941'SLM/9951' MD. ***TOP OF SLUGGITS 9951' MD****. SET 4-1/2"JUNK BASKET ON DEPLOYMENT SLEEVE @ 9924'SLM/9932'MD. 11/07/13 INITIAL T/I/0=700/700/420 PSI. RIH W/3.65"JET CUTTER. LOG CORRECTED TO TBG TALLY DATED 9-3-1987. CCL STOP DEPTH=9880.65', CCL TO CUTTER=20.35'. JET CUT 4-1/2"TBG AT 9901'. GOOD INDICATION OF FIRING, POOH. 11/08/13 POOH W/3.65"JET CUTTER. VERIFY CUTTER FIRED AT SURFACE. WELL S/I AND HANDED OVER TO DSO. FINAL T/I/0=700/700/500 PSI. 11/12/13 INITIAL T/I/0=550/500/500 PSI. RIH W/HEAD/GO ADAPTOR/GYRO TOOL. 11/13/13 CURRENTLY IN HOLE W/HEAD GO ADAPTOR/GYRO. LOGGED GYRO SURVEY FROM SURFACE TO 9850'. WELL S/I AND SECURE, HAND OVER TO DSO. FINAL T/I/0=750/500/500 PSI. 11/15/13 T/I/0=740/760/470 Temp= SI Circ well, CMIT-TxIA to 1000 psi, MIT-OA to 2000 psi (RWO prep) Speared into Tbg w/15 bbls neat methanol followed by 1385 bbls SeaWater taking returns up IA over to 02-32 F/L to production. Pump 170 bbls diesel down tbg. Freeze protect surfaces line w/10 bbls 60/40 meth.Turn 02-32 well over to DSO to POP. U-tube diesel from tbg to IA. CMIT T x IA to 1000 psi. FAILED. .T/IA lost 20/21 psi in first 15 minutes&22/22 psi in second 15 minutes. PSI loss most likely due to thermal issues. Bleed T/IA pressures down to 450/450 psi. FWHP=450/450/321. IA&OA OTG. Swab, SSV, &wing closed. Master open. 11/16/13 T/I/O=2/12/277 Temp= SI CMIT-TxIA**PASSED**to 1000 psi/MIT-OA to 2000 psi (RWO prep) Pumped 3 bbls 28*diesel down Tbg to reach test pressure for CMIT-TxIA. 1st 15 minutes T/IA lost 38/29 psi. 2nd 15 minutes T/IA lost 10/10 psi.Total T/IA loss in 30 minutes=48/39 psi. Bled TxIAP (—3 bbls). Pumped 4 bbls diesel down OA to reach test pressure. 1st 15 minutes OA lost 104 psi.2nd 15 minutes OA lost 45 psi. Total loss in 20 minutes= 149 psi. Bled OAP down to 250 psi. FWHP=2/14/250. Swab, SSV, &wing closed. Master, IA, &OA open. Page 1 of 2 02-18B, Well History (Pre Rig Workover) Date Summary 12/25/13 T/I/O=SSVNac/10. Temp=SI. Bleed OAP to 0 psi &hold open bleed for shift. OA FL= Near surface. 12/25/13 T/I/O=SSVNAC/250. Temp=SI. Bleed OAP to 0 psi (pre RWO). Wellhouse,flowline, and tree scaffold removed. OA FL near surface. Bled OAP to 0 psi in 4.5 hrs(all gas). No monitor. SSV, MV=C. IA, OA=OTG. 1600. 12/26/13 T/I/O=SSVNac/10.Temp=SI. See log for details. Bleed OAP to 0 psi &hold open until)end of shift. Held open bleed for 1 hour 55 minutes. Rig down&monitor for 15 minutes. No change in WHP's during 20 minute monitor. Final WHP's= SSVNac/0. 12/27/13 T/I/O=S1/0/8 RD Front side IA Temp valve#46 Remove back side IA blind flange attempt to lossen back side IA VR Plug made change with day crew. 12/27/13 T/I/O=S1/0/0 Install new valves on both IA/OA back side Pull VR plugs back side IA/OA and piggy back Both IA and OA back side valves. Temp Valve#46 on OA back side Temp Valve#25 On IA back side. Install VR plugs on front side IA/OA Remove IA/OA valves and installed tapped blind flanges.Torqued all conections to API Specs and PT'd. Install drilling scaffolding RDMO. Final T/1/O=VAC/0/0. 12/28/13 T/l/O-0/0/3(post circ-out) Pressured tubing to 305 psi. from IA with 2 bbls of diesel. Final WHP- 305/290/3. 12/29/13 T/l/O=250/450/0. Set 5"Gray"K" BPV#615 @ 96"(set good). N/D upper tree, N/U temp SV#16(Dry Hole conversion).Torque MV x SV to API spec. PT'd MV x SV(Passed). *Final WHP= BPV/0/0. Page 2 of 2 North America-ALASKA-BP Page 1 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/30/2013 00:00 - 01:30 1.50 RIGD P PRE SKID RIG INTO MOVING POSITION. -PJSM. -WELL AND CELLAR IS SECURED. -SKID RIG INTO MOVING POSITION. 01:30 - 05:00 3.50 MOB P PRE 'MOVE RIG OFF OF WELL. -PJSM. -CHECK RADIO COMMUNICATIONS. -MOVE RIG OFF OF OWDW-C WELL. -MOVE RIG AROUND PAD TO DS-6 TO INSTALL BOOSTERS. 05:00 - 06:30 1.50 MOB P PRE RIG UP AND INSTALL BOOSTER WHEELS. -PJSM. -RIG UP AND INSTALL BOOSTER WHEELS FOR MOBE TO DS-02. "SENT NOTICE OF BOPE TEST TO AOGCC @ 06:40 AM 12/30/2013" 06:30 - 18:00 11.50 MOB P PRE RIG MOVE PAD TO PAD. -PJSM. -RIG MOVE FROM DS-6 TO DS-2 ACCESS ROAD VIA SPINE ROAD,OXBOW ROAD AND WESTDOCK ROAD. 18:00 - 18:30 0.50 MOB P PRE MOVE RIG ON DS-2 ACCESS ROAD TO BACK SIDE OF DS-2. 18:30 - 20:30 2.00 MOB P PRE REMOVE BOOSTERS. -PJSM. -REMOVE BOOSTER WHEELS. *SIMOPS-PLACE MATS AROUND AND IN FRONT OF WELL TO MOVE RIG ONTO WELL. 20:30 - 22:30 2.00 MOB P PRE SPOT RIG OVER WELL. -PJSM. -TEST ESD FOR MOVING SYSTEM. -JOCKEY RIG INTO POSITION. -MOVE RIG OVER WELL AND CENTER. -SHIM AND LEVEL RIG. 22:30 - 00:00 1.50 RIGU P PRE SKID RIG FLOOR. -PJSM. -SKID RIG INTO DRILLING POSITION. 12/31/2013 00:00 - 02:30 2.50 RIGU P PRE RIG UP RIG. -PJSM. -RIG UP RIG FLOOR. -MOBE PORTABLE HEATERS FOR CELLAR. -SKID CONVEYOR INTOP DRILLING POSITION. -HOOK UP AND WORK ON STEAM LINES ON RIG FLOOR. -PREP MUD PITS FOR TAKING ON SEAWATER. 'SIMOPS-HARDLINE CREW MAKING UP FLOW BACK TANK LINES. 02:30 - 04:30 2.00 RIGU P PRE RIG UP RIG. -RIG UP CELLAR LINES AND AREA. -BRING ON 120 DEGREE SEAWATER INTO MUD PITS(580 BBLS). -HARD LINE CREW CONTINUE TO MAKE UP FLOWBACK TANK LINES AND TEST. **RIG ACCEPTED AT 04:30 AM ON 12/31/2013. 04:30 - 05:00 0.50 RIGU P PRE HARD LINE CREW MAKE UP FLOWBACK TANK LINES AND TEST. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 2 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) I Start Date:12/30/2013 End Date:1/9/2014 X3-01400-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 05:30 0.50 RIGU P PRE MOBE LUBRICATOR TO RIG FLOOR. 05:30 - 06:00 0.50 RIGU P PRE EVACUATION DRILL. -HELD RIG FIRE/EVACUATION DRILL. -HELD AAR AFTER DRILL. 06:00 - 07:30 1.50 RIGU P PRE RIG UP AND TEST LUBRICATOR. -PJSM. -RIG UP LUBRICATOR. TEST LUBRICATOR TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES EACH-GOOD TEST. 07:30 - 08:30 1.00 RIGU P PRE TEST EMERGENCY SHUTDOWNS. -PJSM. -TEST ESD SYSTEMS AND CONTROLS. _ 08:30 - 10:00 1.50 WHSUR P WHDTRE PULL BACK PRESSURE VALVE. -PJSM. -CHECK FOR PRESSURE ON IA-NO PRESSURE. -PULL BACK PRESSURE VALVE. -SHUT IN AND SECURE WELL. -RIG DOWN LUBRICATOR. 10:00 - 12:00 2.00 I CLEAN P — PRE PREP MUD LINES FOR TESTING. -PJSM. -PREP MUD LINES TO TEST. -RIG UP LINES FROM MUD PUMPS TO CHOKE SKID. 12:00 - 13:30 1.50 CLEAN P PRE EVACUATION DRILL. -HELD RIG EVACUATION DRILL. -HELD MR AFTER DRILL. ,-PJSM ON RIGGING UP TO CIRCULATE OUT •FREEZE PROTECT. 13:30 - 15:30 2.00 CLEAN P PRE PRESSURE TEST MUD LINES. -FLUID PACK ALL MUD LINES. -TEST ALL MUD SURFACE LINES TO 250 PSI LOW/3500 PSI HIGH-TEST GOOD. 15:30 - 19:30 4.00 CLEAN P PRE CIRCULATE OUT FREEZE PROTECT. -PJSM. -REVERSE CIRCULATE OUT 50 BBLS DIESEL DOWN IA OUT TUBING. -CIRCULATE AT 2 BBL/MIN @ 170 PSI. PRESSURE WENT TO 280 PSI TO BREAK OVER.STAGED UP TO 3 BBLS/MIN=360 PSI,4 BBUMIN=600 PSI,5 BBUMIN=930 PSI,6 BBL/IN=1380 PSI.FCP=1330 PSI. -SWAP AROUND AND CIRCULATE DOWN TUBING OUT OF THE IA.CIRCULATE OUT 200 BBLS. -CIRCULATE AT 2 BBL/MIN @ 80 PSI.STAGED UP TO 3 BBLS/MIN=190 PSI,4 BBL/MIN=330 PSI,5 BBL/MIN=630 PSI,6 BBL/IN=960 PSI. FCP=1110 PSI. -FLOW CHECK FOR 10 MINUTES. -RIG UP TO FLUID PACK THE LINES OUTSIDE — i (TO THE FLOWBACK TANK)WITH DIESEL. 19:30 - 23:00 3.50 WHSUR P WHDTRE INSTALL BACK PRESSURE VALVE AND TEST. -PJSM. I-MAKE UP LUBRICATOR. -TEST QUICK TEST SUB. -INSTALL BACK PRESSURE VALVE. -TEST BACK PRESSURE VALVE FROM BELOW TO 2500 PSI FOR 5 MINUTES-GOOD TEST. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 3 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UW:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 WHSUR P WHDTRE RIG DOWN LUBRICATOR -PJSM. -RIG DOWN LUBRICATOR AND QUICK TEST SUB. -SUCK ALL FLUID OUT OF THE TREE IN PREPARATION FOR NIPPLING DOWN. 1/1/2014 00:00 - 02:00 2.00 WHSUR P WHDTRE BLEED DOWN HANGER VOID AND CONTROL LINE. -PJSM. -CAMERON TECH BLEED DOWN HANGER VOID AND CONTROL LINE. *SIM OPS-PREP TOOLS AND EQUIPMENT FOR BOP TEST. -WORK ON MP-2'S. -SECURE TOOLS AND EQUIPMENT ON PAD DUE TO HIGH WINDS. 02:00 - 03:30 1.50 WHSUR P WHDTRE NIPPLE DOWN TREE. -PJSM. -RIG DOWN WORKING PLATFORM ON TREE. -NIPPLE DOWN TREE AND ADAPTER FLANGE. -BREAK APART ADAPTER FLANGE AND TREE. • 03:30 - 05:30 2.00 WHSUR P WHDTRE INSTALL BLANKING PLUG AND SECURE HANGER. -PJSM. -CAMERON TECHS WORK LOCK DOWN SCREWS IN AND OUT.3.5"OUT,2.5"IN. -PLUG HANGER PORTS. -MAKE UP 5-7/8"ACME RH CROSSOVER TO HANGER-17 TURNS TO TIGHTEN. -CHECK CLEARANCE ON BPV AND BLANK OK TO USE CROSSOVER DURING BOP TEST. -INSTALL BLANKING PLUG ON BPV. 05:30 - 09:00 3.50 BOPSUR P PRE NIPPLE UP BOPE. -PJSM. -NIPLE UP BOP STACK. -OBTAIN RKB'S. 09:00 - 10:30 1.50 BOPSUR P PRE TEST BLANK PLUG. -PJSM. -TEST BLANK PLUG AND SHELL TEST BOPE WITH 4"TEST JOINT TO 250 OSI LOW/3500 PSI HIGH-TEST GOOD. 10:30 - 18:00 7.50 BOPSUR P PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH. -TEST WITH 4"AND 4.5"TEST JOINTS. -ALL TESTS CHARTED.SEE ATTACHED BOP TEST CHARTS. -TEST WITNESS WAIVED BYAOGCC REP ROBERT NOBLE. 18:00 - 18:30 0.50 BOPSUR N RREP PRE PREP TO CHANGE OUT MANUAL KILL LINE VALVE DUE TO LEAKAGE. -PJSM. -SUCK OUT BOP STACK. -BLOW DOWN KILL LINE. 18:30 - 22:30 4.00 BOPSUR N RREP PRE CHANGE OUT MANUAL KILL LINE VALVE DUE TO LEAKAGE. -PJSM. -REMOVE MANUAL KILL LINE VALVE AND REPLACE WITH REBUILT VALVE. Printed 1/21/2014 9:09:08AM • North America-ALASKA-BP WOW, Page 4 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UW:500292045400 Active datum:Kelly Bushing/Rotary Table©64.00usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 BOPSUR P PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH. -TEST WITH 4"AND 4.5"TEST JOINTS. '-ALL TESTS CHARTED.SEE ATTACHED BOP TEST CHARTS. -TEST WITNESS WAIVED BYAOGCC REP ROBERT NOBLE. 1/2/2014 00:00 - 00:30 0.50 BOPSUR P PRE TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH. -TEST WITH 4"AND 4.5"TEST JOINTS. -ALL TESTS CHARTED.SEE ATTACHED BOP TEST CHARTS. -TEST WITNESS WAIVED BYAOGCC REP ROBERT NOBLE. 00:30 - 01:30 1.00 BOPSUR P PRE BLOW DOWN ALL LINES. -PJSM. -BLOW DOWN ALL LINES. -SUCK OUT BOP STACK. -BLOW DOWN CHOKE AND KILL LINES. 01:30 - 02:30 1.00 BOPSUR P PRE PULL BLANKING PLUG. -PJSM. -MAKE UP T-BAR FOR BLANKING PLUG RETRIEVAL. -PULL BLANKING PLUG. -SIM-OPS-MOBILIZE BHA#1 (SPEAR)TO RIG FLOOR. 02:30 - 04:30 2.00 BOPSUR N HMAN PRE PULL BACK PRESSURE VALVE. -PJSM. -MAKE UP AND RIG UP LUBRICATOR AND QUICK TEST SUB. -ATTEMPT TO TEST LUBRICATOR AND QUICK TEST SUB TO 250 PSI LOW/3500 HIGH FOR 5 MINUTES EACH. 04:30 - 08:00 3.50 BOPSUR N HMAN PRE INSTALL BLANKING PLUG. -ATTEMPT TO INSTALL BLANKING PLUG.HAD TO SUCK OUT STACK TO INSTALL PLUG. 08:00 - 09:30 1.50 BOPSUR P PRE RIG UP LUBRICATOR. -TESTED BLIND RAMS TO 3500 PSI TO VERIFY TEST. -RIG UP LUBRICATOR TO DUTCH RISER AND TEST TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MINUTES EACH-GOOD TEST. 109:30 - 12:00 2.50 BOPSUR P PRE PULL BLANKING PLUG AND BACK PRESSURE VALVE. -LAY DOWN LUBRICATOR. -PULL AND LAY DOWN DUTCH RISER TO PULL BLANKING PLUG. -RETRIEVE BLANKING PLUG. -INSTALL DUTCH RISER AND LUBRICATOR. -TEST AT QUICK TEST SUB.-GOOD TEST. -CHECK FOR PRESSURE UNDER BACK PRESSURE VALVE-0 PRESSURE. -PULL BACK PRESSURE VALVE. -RIG DOWN LUBRICATOR. 12:00 - 14:30 2.50 PULL P DECOMP LAY DOWN LUBRICATOR AND TOOLS FROM RIG FLOOR. -PJSM. -LAY DOWN TOOLS NOT NEEDED AND LUBRICATOR FROM THE RIG FLOOR. -BRING UP SPOOLER AND SCHLUMBERGER TOOLS TO RIG FLOOR. Printed 1/21/2014 9:09:08AM North America-ALASKA BP,,n; .,� Page 5 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. IUWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 14:30 - 15:00 0.50 PULL P DECOMP MAKE UP SPEAR BHA -PJSM. -MAKE UP SPEAR BHAAS PER BAKER FISHING HAND. 15:00 - 16:00 1.00 PULL P DECOMP PULL HANGER. -PJSM. -RIH WITH SPEAR ASSEMBLY. -CAMERON BACK DOWN LOCK DOWN SCREWS. -PULL HANGER TO RIG FLOOR.HANGER BROKE FREE AT 188K,PUWAFTER WAS 165K. -PULL 1 FULL JOINT ABOVE RIG FLOOR. -TERMINATE DUAL CONTROL LINES ON NEXT JOINT DOWN AND SECURE TO JOINT. -POSITION STRING WITH FULL SLICK JOINT ACROSS BOP STACK FOR CIRCULATION. 16.00 - 19:00 3.00 PULL P DECOMP CIRCULATE BOTTOMS UP THRU CHOKE. -SHUT IN WELL ON ANNULAR. -LINE UP CHOKE MANIFOLD TO CIRCULATE THRU GAS BUSTER. -CIRCULATE BOTTOMS UP THRU CHOKE. -CIRCULATE AT 3 BPM=100 PSI,4 BPM=190 PSI,5 BPM=280 PSI.FINAL CIRCULATING PRESSURE @ 5 BPM=280 PSI. 19:00 - 20:00 1.00 PULL P DECOMP REMOVE HANGER FROM STRING. -PJSM. -REMOVE SPEAR ASSEMBLY FROM HANGER/PUP JOINT. -BREAK OUT HANGER AND PUP FROM STRING. -LAY DOWN SPEAR BHA. 20:00 - 21:00 1.00 PULL P DECOMP BLOW DOWN TOP DRIVE,CHOKE MANIFOLD AND ALL SURFACE LINES. -CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED FOR UPCOMING OPERATIONS. -MAKE UP SAFETY VALVE AND CROSSOVER AND SAFETY JOINT. 21 00 - 00:00 3.00 PULL P DECOMP DECOMPLETE WELL. -RIG UP CONTROL LINE SPOOLER. -PULL AND LAY DOWN 4.5"12.6#L-80 TUBING WITH DUAL CONTROL LINES. -PULLED 54 JOINTS TUBING WITH CONTROL LINES TO 2216'. -RECOVERED 29 CONTROL LINE BANDS OUT OF THE 31 BANDS MENTIONED IN THE TALLY. (2 NOT RECOVERED). 1/3/2014 00:00 - 01:30 1.50 PULL P DECOMP RIG DOWN CONTROL LINE SPOOLER. -PJSM. -SCHLUMBERGER TECH CHECKED CONTROL LINE FOR NORM.-NO NORM DETECTED. -RIG DOWN AND LAY DOWN CONTROL LINE SPOOLER AND TOOOLS. • Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 6 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table©64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 09:00 7.50 PULL P DECOMP LAY DOWN 4.5"12.6#L-80 COMPLETIONS TUBING FROM 2216'TO SURFACE. -PJSM. -PULLED AND LAID DOWN A TOTAL OF 247 JOINTS OF 4.5"TUBING,1-SSSV NIPPLE ASSEMBLY,1-GASLIFT MANDREL ASSEMBLY, AND 1 CUT OFF JOINT. -LAST JOINT PULLED WAS 2.86"WITH A FLARE OF 5.125". *KICK WHILE TRIPPING DRILL-ALL HANDS RESPONDED WELL,FOLLOWED BYAAR WITH ALL CREW MEMBERS. 09:00 - 12:00 3.00 FISH P DECOMP CLEAN CASING EQUIPMENT AND CLEAR RIG FLOOR. -PJSM. -CLEAN CASING EQUIPMENT AND SEND TO GROUND. -CLEAR RIG FLOOR OF ALL OTHER CASING HANDLING TOOLS. *MONITOR OA STARTING AT 09:00=0 PSI 12:00 - 12:30 0.50 WHSUR P DECOMP ATTEMPT TO INSTALL WEAR RING. -PJSM. -RAN WEAR RING INTO WELLHEAD.HAD PROBLEMS RELEASING RUNNING TOOL FROM WEAR RING. -PULL WEAR RING TO INSPECT.FOUND EXTRUSIONS IN THE J-SLOT POSSIBLY CAUSED BY OVERTIGHTENING LOCK DOW SCREWS. -DISCUSSED WITH TOWN.DECIDED NOT TO RUN WEAR RING DUE TO CHANGING TUBING SPOOL. 12:30 - 15:00 2.50 FISH P DECOMP SET UP SLICKLINE UNIT. -PJSM. -RIG UP SCHLUMBERGER WIRELINE UNIT. -GET ZERO AT UPPER LOCK DOWN SCREWS. 15:00 - 20:00 5.00 FISH P DECOMP RUN CCL/GAMMA RAY LOG. -PJSM. -WIRELINE RIH TO 9927'(WIRELINE MEASUREMENT)AND TAGGED. -PICK UP FROM 9927'TO TOP OF TUBING STUB.ENCOUNTERED SEVERAL TIGHT SPOTS BEFORE COMING OUT OF STUB. DISCUSSED WITH TOWN AND DECIDED NOT TO GO BACK INTO STUB AND START LOG FROM TOP OF STUB. -WIRELINE RAN LOG FROM 9890'TO 8799' (LOG TOOL DEPTH). -MADE SECONDARY PASS AT SAME DEPTH. -DEPTHS TIED INTO 9766'(BOTTOM OF 9.625" 19.83'PUP IN 9.625"CASING TALLY). 20:00 - 20:30 0.50 FISH P DECOMP RIG DOWN CCL/GR LOGGING TOOL. -RIG DOWN AND DOWNLOAD CCUGAMMA RAY DATA TO ENSURE GOOD INFORMATION. _-GOOD INFORMATION CONFIRMED. 20:30 - 21:30 1.00 FISH P DECOMP RIG DOWN WIRELINE. -EMAIL LOG DATA TO TOWN ENGINEER. -PJSM. -RIG DOWN WIRELINE AND SEND EQUIPMENT TO GROUND VIA BEAVERSLIDE. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 7 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:OOAM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:00 0.50 FISH P DECOMP STRAP AND TALLY BHA. -STRAP AND TALLY DRILL COLLARS. -WAIT ON SLICKLINE UNITS TO MOVE OUT FROM RIG TO ACCESS BEAVERSLIDE WITH BAKER TOOLS. 22:00 - 00:00 2.00 FISH P DECOMP PICK UP BHA#2(CLEANOUT BHA) -PJSM -BRING BHA#2 TO RIG FLOOR. -PICK UP 9.625"CLEANOUT BHA AND RUN IN HOLE. *0 PSI ON OA @ MIDNIGHT. 1/4/2014 00:00 - 02:30 2.50 FISH P DECOMP MAKE UP BHA#2(9-5/8"CASING CLEANOUT RUN). -PJSM. -MAKE UP CROSSOVERS FOR SAFETY JOINT AND FLOOR VALVE. -RUN IN HOLE WITH BHA#2. -PICK UP AND RUN IN HOLE WITH DRILL COLLARS 1 X 1 FROM PIPE SHED. 02:30 - 08:30 6.00 FISH P DECOMP RUN IN HOLE WITH BHA#2(CASING CLEANOUT RUN). -RIH ON ELEVATORS WITH CLEANOUT BHA ON 4"DRILL PIPE. -RIH WITH DRILL PIPE,PICKING UP PIPE 1 X 1 FROM PIPE SHED. -DRIFT EACH JOINT AS IT COMES TO THE FLOOR. -RIH FROM 280'TO 6959'. • 08:30 - 09 00 0 50 FISH P DECOMP PJSM ON SETTING RTTS. -PJSM WITH HALLIBURTON,BP AND DOYON ON PICKING UP AND SETTING THE RTTS. 09:00 - 09:30 0.50 DHB P DECOMP RIH AND SET RTTS. -STAND BACK 1 STAND OF DRILL PIPE IN DERRICK. -PICK UP 9-5/8"HES RTTS PACKER AND RIH ON 1 STAND OF 4"DRILL PIPE. • -RIH WITH RTTS TO 100'. -SET PACKER BY 1/4 TURN TO THE RIGHT. SET ALL WEIGHT ON PACKER. -BACK OUT RUNNING TOOL FROM PACKER 21 TURNS TO LEFT. -POOH WITH RUNNING TOOL. -BREAK OUT AND LAY DOWN RUNNING TOOL. -STAND BACK 1 STAND DRILL PIPE IN DERRICK. 09:30 - 10:00 0.50 DHB P DECOMP TEST RTTS. -PJSM. -RIG UP TO TEST RTTS WITH BLIND RAMS CLOSED. -TEST RTTS TO 250 PSI LOW/2500 PSI HIGH FOR 5 MINUTES EACH ON CHART-GOOD TEST. 10:00 - 11:00 1.00 WHSUR P DECOMP BLOW DOWN TOP DRIVE AND ALL SURFACE LINES. -SUCK OUT BOP STACK. -BLEED OFF KOOMEY. • Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 8 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay l Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release: 1/9/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table©64.00usft(above Mean Sea Level) Date From-To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) l (usft) 11:00 - 17:00 6.00 BOPSUR P DECOMP N/DBOPANDTREE. -PJSM. -PULL RISER. -TIE ONTO BOP STACK WITH CRANES. -NIPPLE DOWN BOP STACK AND SET BACK ON STUMP. -NIPPLE DOWN TUBING SPOOL. -ONE OF THE LOCK DOWN SCREWS ON THE SPOOL ON CASING HEAD SEIZED UP. REPLACED LOCK DOWN SCREW ON CASING HEAD. *SIMOPS-LOAD PIPE SHED WITH 4.5"TUBING. -SEMI-ANNUAL DERRICK INSPECTION. 17:00 - 18:30 1.50 WHSUR P DECOMP REMOVE SECONDARY PACKOFF AND INSTALL NEW PACKOFF. 18:30 - 22:30 4.00 WHSUR P DECOMP N/U TUBING SPOOL AND TEST. -INSTALL NEW TUBING SPOOL.TORQUE TO SPECS. -TEST NEW PACK-OFF TO 250 PSI LOW(5 MINUTES)/3500 PSI HIGH(30 MINUTES). -TEST NEWTUBING HANGER/CASING FLANGE VOID TO 250 PWI LOW(5 MINUTES)/3500 PSI HIGH(30 MINUTES). 22.30 - 00.00 1.50 BOPSUR P i DECOMP N/U BOPS. -PJSM. I-NIPPLE UP BOP'S. I-INSTALL RISER,TURNBUCKLES,FLOWLINE AND COVERS. 1/5/2014 00:00 - 02:00 2.00 BOPSUR P DECOMP TEST BOP FLANGE BREAK -PJSM. -PICK UP AND INSTALL TEST PLUG. -CLOSE BLIND/SHEAR RAMS. -RIG UP AND TEST BOP ADAPTER FLANGE TO TUBING SPOOL BREAK TO 3500 PSI FOR 5 CHARTED MINUTES. '-BLEED OF PRESSURE OFF. -OPEN BLIND/SHEAR RAMS AND PULL TEST PLUG. -BLOW DOWN CHOKE AND KILL LINES. -INSTALL WEAR RING ID-8 3/4"OD-13 1/2" LENGTH 1.26' 02:00 - 04:00 2.00 DHB P DECOMP PULL RTTS. -PJSM. -INSTALL FOSV ON STAND AND CLOSE. RIH WITH RTTS RETRIEVAL TOOL. -TURN 1 TURN TO LEFT,THEN TURN 21 TURNS TO RIGHT. -SLOWLY OPEN FOSV-NO PRESSURE. -SHUT ANNULAR AND UNSEAT RTTS. -CHECK FOR PRESSURE-NONE FOUND. OPEN CHOKE AND CHECK NEEDLE VALVE FOR PRESSURE-NONE FOUND. -OPEN BAG AND BLOW DOWN CHOKE MANIFOLD AND LINE. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 9 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2;500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud DateTme:9/1/1980 12 00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) _ Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations 04:00 - 06:30 2.50 (u ) CLEAN P DECOMP RUN IN HOLE WITH BHA#2(CASING CLEANOUT RUN). • -RIH ON ELEVATORS WITH CLEANOUT BHA ON 4"DRILL PIPE. -RIH WITH DRILL PIPE,PICKING UP PIPE 1 X 1 FROM PIPE SHED. -DRIFT EACH JOINT AS IT COMES TO THE FLOOR -RIH FROM 6959'TO 9555'. 06:30 - 07:00 0.50 CLEAN P DECOMP PERFORM SCRAPING OPERATIONS -SCRAPE 9555'TO 9464'. -PARAMETERS=PUW 225K,SOW 163K,RTW 186K @ 40 RPM 5K TORQUE,PUMP @ 10 BPM 1280 PSI. • 07:00 - 07:30 0.50 CLEAN P DECOMP RIH ON ELEVATORS -BLOWDOWN TOP DRIVE. -RIH 9557'TO 9893'. -TAG 4.5"TUBING STUB©9893'. 07:30 - 09:00 1.50 CLEAN P DECOMP DRESS OFF TUBING STUB -DRESS OFF TUBING OD FROM 9893'TO 9910'. -PARAMETERS=PUW 225K,SOW 169K,RTW 190K @ 60 RPM 5K TORQUE,WOM 2-3K. -AFTER MILLING,TAG STUMP @ 9896'. *ABLE TO PASS OVER STUMP WITH NO PUMPING,NO ROTATION 09:00 - 10:30 1.50 CLEAN P DECOMP CIRCULATE HI-VIS SWEEP -PUMP 30 BBLHI-VIS SWEEP @ 10 BPM @ 1280 PSI. 10:30 - 11:00 0.50 CLEAN P DECOMP FLOW CHECK -FLOW CHECK WELL FOR 10 MINUTES-WELL STATIC. BLOWDOWN TOP DRIVE. -PJSM ON POOH-STAND BACK DP IN DERRICK. -LD A DOUBLE TO GET ON EVEN STANDS. 11:00 - 15:30 4.50 CLEAN P DECOMP POOH ON ELEVATORS -POOH 9872'TO 280'. -FLOW CHECK WELL FOR 10 MINUTES BEFORE PULLING NONSHEARABLES ACROSS THE BOP STACK-WELL STATIC. 15:30 - 17:30 2.00 CLEAN P DECOMP HANDLE DRESS OFF BHA -PJSM LD DRESS OFF BHA. LD BHA 280'TO 94'. -KICK WHILE TRIPPING DRILL W/AAR. -LD BHA 94'TO SURFACE. 17:30 - 19:00 1.50 FISH P DECOMP CLEAR RIG FLOOR OF DRESS OFF BHA -PJSM BEAVER SLIDE OPPS FOR CLEARING RIG FLOOR OF DRESS OFF BHA. -LD ALL NON ESSENTIAL TOOLS FOR UPCOMING JOB. 19:00 - 19:30 0.50 FISH P DECOMP BLOWN DOWN CHOKE. 19:30 - 00:00 4.50 FISH P DECOMP PICKUP JUNK BASKET RETRIEVAL BHA -PJSM FOR PU&RIH WITH JUNK BASKET RETRIEVAL BHA. -RIH ON 4"DRILL PIPE FROM DERRICK ON ELEVATORS. -RIH 90'TO 1993'. -FILLED PIPE AT FIRST 20 STANDS IN THE HOLE-FILL IS CORRECT. -RIH 1993'TO 4368'. Printed 1/21/2014 9.09:08AM North America-ALASKA-BP Page 10 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER X3-014D0-C:(2.500,000.00) yp (WO) Start Date:12/30/2013 End Date: 1/9/2014 Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UW:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/6/2014 .00:00 - 00:30 0.50 FISH P DECOMP RIG SERVICE. 00:30 - 02:00 1.50 FISH P DECOMP RIH ON ELEVATORS W/JUNK BASKET RETRIEVAL BASKET BHA. -PJSM. -RIH ON 4"DRILL PIPE FROM DERRICK ON ELEVATORS. -RIH 4368'TO 9688'. 02:00 - 03:00 1.00 FISH P I DECOMP KICK DRILL. --KICK WHILE TRIPPING DRILL. 03:00 - 04:30 1.50 FISH P DECOMP CUT&SLIP DRILL LINE. -PJSM. -CUT&SLIP 59.5'DRILL LINE. -SERVICE TOP DRIVE. 04:30 - 05:00 0.50 FISH P DECOMP RIH FROM 9686'TO 9874' -PJSM. -PU DP 1X1 FROM PIPE SHED AND RUN IN HOLE FROM 9686'TO 9874'. 05:00 - 06:00 1.00 FISH P DECOMP WASH DOWN AND LATCH JUNK CATCHER. -WASH DOWN FROM 9874'TO 9946', PUMPING AT 1.5 BBL/MIN @ 225 PSI. -TAGGED UP AT 9946'. -SET DOWN 5K TO LATCH JUNK CATCHER. -PICK UP 10'THEN SET DOWN AND SET 8K TO VERIFY LATCHING INTO JUNK CATCHER. 06:00 - 06:30 0.50 FISH P DECOMP FLOWCHECK WELL -FLOWCHECK WELL FOR 10 MINUTES-WELL STATIC. -BLOW DOWN TOP DRIVE AND SURFACE LINES. 06:30 - 07:00 0.50 FISH P DECOMP PJSM ON LAYING DOWN DRILL PIPE TO THE PIPE SHED. -PIPE PULLING WET:DECIDED TO OPEN PUMP OUT SUB. 07:00 - 07:30 0.50 FISH P DECOMP OPEN PUMP OUT SUB. -LAY DOWN DRILL PIPE TO PIPE SHED FROM 9946'TO 9800'. -DROP DART AND PUMP 20 BBLS TO OPEN PUMP OUT SUB. -PUMP OUT SUB OPENED UP AT 1300 PSI SURFACE PRESSURE. 07:30 - 15:00 7.50 FISH P DECOMP POOH ON ELEVATORS-LAYING DOWN PIPE TO THE PIPE SHED. -BLOW DOWN TOP DRIVE. -PULL OUT OF HOLE WITH 4"DRILL PIPE AND JUNK BASKET BHA FROM 9800'TO 188'. -LAY DOWN DRILL PIPE 1 X 1 IN PIPE SHED. 15:00 - 17:00 2.00 FISH P DECOMP LAY DOWN BHA#3. -PJSM. -LAY DOWN JUNK CATCHER RETRIEVAL BHA AND JUNK CATCHER. 17:00 - 18:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR FOR UPCOMING OPERATIONS. 18:00 - 19:00 1.00 WHSUR P RUNCMP I,PULL WEAR BUSHING. -PJSM. -PULL WEAR BUSHING. 19:00 - 20:00 1.00 RUNCOM P RUNCMP MAKE DUMMY RUN WITH HANGER. —PJSM. -MAKE UP HANGER AND LANDING JOINT. -MAKE DUMMY RUN WITH HANGER AND MARK LANDING JOINT. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 11 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2.500,000.00) Project:Prudhoe Bay , Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor.DOYON DRILLING INC. 1 UWI:500292045400 Active datum:Kelly Bushing/Rotary Table ,t 64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT • NPT Depth j Phase Description of Operations (hr) (usft) 20:00 - 23:00 3.00 RUNCOM P RUNCMP RIG UP TO RUN COMPLETIONS STRING. 1-PJSM. j-RIG UP TO RUN 4.5"VAMTOP TUBING. -CHANGE OUT ELEVATOR LINKS. -RIG UP COMPENSATOR AND SINGLE JOINT ELEVATORS. -SET UP TORQUE TURN AND POWER TONGS. '-SET UP FOSV WITH CROSSOVER AND SAFETY JOINT. 23:00 - 00:00 1.00 RUNCOM P RUNCMP RUN COMPLETIONS EQUIPMENT. -PJSM. -PICK UP OVERSHOT,X-NIPPLE AND BOTTOM CASING WEDGE AND RUN IN HOLE. -BAKER LOCKED ALL CONNECTIONS. 1/7/2014 00:00 - 10:30 10.50 RUNCOM P RUNCMP RUN COMPLETIONS TUBING WITH CASING WEDGES, NIPPLES,HES'TNT'PACKER, AND GAS LIFT MANDRELS. -PJSM. -PU,MU AND RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION TO 4200'. 10:30 - 11:00 0.50 RUNCOM P RUNCMP HELD D1 KICK WHILE TRIPPING DRILL, FOLLOWED BYAAR. -MIX AND PUMP 30 BBL WEIGHTED/HI-VIS SLUG. 11:00 - 12:00 1.00 RUNCOM P RUNCMP RUN 4-1/2"COMPLETION. -PU,MU AND RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION FROM 4200'TO 4839'. 12:00 - 12:30 0.50 ' RUNCOM P RUNCMP SERVICE RIG. -LUBRICATE AND INSPECT TOP DRIVE, DRAWWORKS,IRON ROUGHNECK,CROWN AND DERRICK. 12:30 - 21:00 8.50 RUNCOM P RUNCMP RUN 4-1/2"COMPLETION. -PJSM. -PU,MU AND RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION FROM 4839'TO 9756'. •-OBTAIN PARAMETERS. *PUW=163K SOW=135K -PU,MU AND RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION FROM 9756'TO 9919, SHEARING OVERSHOT PINS AT 9908'AND '9916'WITH 6K DOWN ON EACH. 21:00 - 22:30 1.50 RUNCOM P RUNCMP SPACE OUT AND LAND HANGER. -SPACE OUT. -CHANGE ELEVATORS. -PU AND MU CAMERON 13-5/8"x 4-1/2" TUBING HANGER WITH LANDING JT. -VOID STACK OF FLUID. -OPEN IA. -LAND TUBING HANGER. *BOTTOM OF OVERSHOT=9914' NO-GO= 9899' SWALLOW=10' -CAMERON TO RILDS AND TORQUE SAME TO 500 FT/LBS. -REMOVE LANDING JT. -CLOSE BLIND RAMS. 22:30 - 00:00 1.50 CONDHL P CLEAN REVERSE CIRCULATE. -PJSM. -RU AND REVERSE CIRCULATE 150 BBLS OF 120°SEAWATER,TAKING RETURNS THROUGH THE MGS,AT 2.5 BPM WITH 760 PSI. Printed 1/21/2014 9:09:08AM North America-ALASKA-BP Page 12 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/8/2014 00:00 - 04:00 4.00 CLEAN P CLEAN REVERSE CIRCULATE CORROSION INHIBITOR. -LINE UP VAC TRUCKS TO TAKE CI DIRECTLY TO MUD PUMP#1. -PUMP 530 BBLS OF CI AND 150 BBLS OF SEA WATER DOWN IA AT 2.5 BPM WITH 760 PSI. -CLEAR RIG FLOOR OF TOOLS USED FOR TUBING RUN. 04:00 - 04:30 0.50 CLEAN P CLEAN FLOW CHECK WELL. -FLOW CHECK WELL FOR 10 MINS AT THE GAS BUSTER. 04:30 - 06:00 1.50 ZONISO P PRODOP SET 4.5"x 9 5/8"TNT PACKER. -CHECK FOR PRESSURE. -OPEN BLINDS. -MAKE UP LANDING JOINT. -DROP BALL AND ROD. -PRESSURE UP TO 250 PSI FOR 5 CHARTED MINUTES. -PRESSURE UP TO 3350 PSI TO SET PACKER. `INDICATION PACKER SET AT 3200 PSI. 06:00 - 07:30 1.50 ZONISO P PRODOP PERFORM MIT ON TUBING AND IA. -HOLD 3350 PSI ON 4-1/2"TUBING FOR 30 CHARTED MINS. -BLED TUBING PRESSURE FROM 3350 PSI TO 2000 PSI. -PRESSURE UP ON IA TO 3140 PSI FOR 30 CHARTED MINS. -BLED OFF TUBING PRESSURE AND DCR SHEAR VALVE SHEARED WITH 1600 PSI DIFFERENTIAL. -NOTIFIED WTL AND WAS GRANTED APPROVAL TO CONTINUE OPERATIONS. 07:30 - 09:30 2.00 BOPSUR P POST CHANGE UPPER PIPE RAMS. -PJSM. -CHANGE UPPER PIPE RAMS FROM 3-1/2"x 6" TO 7"FIXED RAMS. 09:30 - 12:00 2.50 BOPSUR P POST ND BOP STACK. -PJSM. -ND BOP STACK AND SET SAME ON STUMP. 12:00 - 13:00 1.00 WHSUR P POST NU 13-5/8"5M x 4-1/16"5M ADAPTER FLANGE. -PJSM. -NU ADAPTER FLANGE. 13:00 - 14:30 1.50 WHSUR P POST PRESSURE TEST TUBING HANGER VOID AND SEALS. -PJSM. -PRESSURE TEST TUBING HANGER VOID AND SEALS WITH DIESEL TO 250 FOR 5 CHARTED MINS AND 5000 PSI FOR 30 CHARTED MINS. -SIMOPS: PREPARE RIG FLOOR FOR RIG MOVE.RD GAS BUSTER,CHOKE LINE,FLAIR LINE AND MUD BUCKET LINE. DRAIN MUD PUMPS AND CLEAN FILTER PODS. 1430 - 15:30 1.00 WHSUR P POST NU CAMERON 4-1/16"5M DRY HOLE TREE. -PJSM. -NU 4-1/16"5M DRY HOLE TREE. -SIMOPS: BLOW DOWN HARD LINE TO FLOWBACK TANK. CLEAN OUT PIPE SKATE AND DRIP PANS. Printed 1/21/2014 9'09 08AM • North America-ALASKA-BP Page 13 of 13 Operation Summary Report Common Well Name:02-18 AFE No Event Type:WORKOVER(WO) Start Date:12/30/2013 End Date:1/9/2014 X3-014D0-C:(2,500,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:9/1/1980 12:00:00AM Rig Release:1/9/2014 Rig Contractor DOYON DRILLING INC. UWI:500292045400 Active datum:Kelly Bushing/Rotary Table @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:30 2.00 WHSUR P POST PRESSURE TEST CAMERON 4-1/16"5M DRY HOLE TREE. -PJSM. -PRESSURE TEST 4-1/16"DRY HOLE TREE WITH DIESEL TO 250/5000 PSI FOR 5 CHARTED MINS EACH. 17:30 - 20:30 3.00 DHB P POST PULL TWC. -PJSM. -RU AND TEST DSM LUBRICATOR TO 250/ 3000 PSI FOR 5 CHARTED MINS EACH. -PULL TWC. 20:30 - 00:00 3.50 CLEAN P CLEAN RU LRS AND FREEZE PROTECT WELL. -PJSM. -RU LRS AND TEST LINES TO 250/3500 PSI FOR 5 CHARTED MINS EACH. -FREEZE PROTECT WELL WITH 170 BBLS OF 80°DIESEL AT 2 BPM WITH 127 PSI. 1/9/2014 00:00 - 01:30 1.50 CLEAN P CLEAN FREEZE PROTECT WELL. -FREEZE PROTECT WELL WITH 170 BBLS OF 80°DIESEL AT 2 BPM WITH 289 PSI. -ALLOW 1-HOUR FOR U-TUBE. • 01:30 - 02:30 1.00 DHB P POST INSTALL BPV. .-PJSM. -RU AND TEST LUBRICATOR TO 250/3000 PSI FOR 5 MINS EACH. -INSTALL BPV. 02:30 - 03:30 1.00 DHB P POST TEST BPV. -LRS TEST BPV WITH DIESEL,FROM BELOW TO 2500 PSI FOR 5 CHARTED MINS. '5.5 BBLS TO PRESSURE UP. -BLEED OFF PRESSURE. -RD LRS AND LINES. 03:30 - 06:00 2.50 DEMOB P POST SECURE TREE. -SECURE TREE AND CELLAR. -RDMO. **RIG RELEASED AT 06:00 HRS** Printed 1/21/2014 9:09:08AM 02-18B, Well History (Post-Rig Workover) Date Summary 01/12/14 T/I/O= BPV/VAC/0 Remove piggy back Temp OA valve#46 install blind flange. Remove temp SV#15 and install 4" upper tree.Torque flanges. made change out with night crew see log for details. Final T/I/O= BPVNac/0. 01/24/14 PULLED BALL& ROD FROM RHC PLUG BODY @ 9,542' MD. PULLED DCR VALVE AND SET DUMMY IN STA#4 @ 3,700'SLM/3,722' MD. PULLED RHC PLUG BODY FROM 9,522'SLM/9,542' MD. 01/25/14 BAILED FROM 9937'SLM TO 9950'SLM WITH A 10'x 2.5" PUMP BAILER.(recover—7.25 gallons of sluggits). PULLED 3 1/2"XX PLUG FROM 9961' MD. BRUSH AND FLUSHED 3 3/16" LINER FROM 9974' SLM TO 10323' SLM(tools sd). LRS PUMPED A TOTAL OF 5 BBL OF METH AND 160 BBL OF CRUDE @ 5 BBL/MIN. DRIFTED LINER WITH BAKER 16'x 2.70"/2.63" BAKER DRIFT TO 10,038' SLM AND WORK DOWN TO 10,089'SLM (sd, rub marks up side of drift). DRIFTED W/10'x 2.50" DRIVE DOWN BAILER TO 10,244'SLM (sd, rub marks up side of bailer). 01/25/14 T/I/0=119/275/0 Temp=SI Assist Slickline as Directed. Pumped 160 bbls crude down Tbg while SSL RIH with brush. Final WHPs 240/440/0. Page 1 of 1 IFS= ' 4-1/16'CNV VVH Lt EAE= GRAY02-18BSA4-1/2"CHROME TBG•*OTES: WELL *J E>*PREVI-70° 10307'. ACTUATOR= BAKEf2 C W ELLBORES NOT SHOWN* I MAL KB.ELE 64' 1 . BF ELEV KOP= 10010' 20"CONDUCTOR, -- 80' I 2489' H4-1/2'FES X NP,D=3,813' 1 Max Angle= 97°@ 11139' 94#,H-40 GAS LFT MANDRELS Daum MD= NA D=19.124' ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum ND= 8800'SS /41 4 3722 3680 27 W MG DMY RK 0 01/24/14 L 3 6416 5804 40 MMY DRK 0 01/07/14 13-3/8"CSG,72#,N-80 BUTT,D=12.347" --{ 2697' 2 8404 7273 43 Mv1G DM' RK 0 01/07/14 ' K X. 1 9356 8012 31 MMC DMY RK 0 01/07/14 9-5/8"CSG,47#,L-80 XO TO S00-95 BTC —I 9060' I 9476' —14-1/2"FES X NP,0=3.813" Minimum ID =2.377" @ 10437' 3-3116" X 2-7/8" XO '. ""H 9506' —19-5/8"X 4-1/2-11M TNT PKR,D=3.903' 9-5/8'x 4-1/2"WS WEDGE,8=3.958 —{ 9660'-9677' 9542' —{4-112"FES X NP,D=3.813- 9-5/8" .813'9 5/8"x 4-1/2'WS WEDGE,ID=3.958 — 9852'-9869' Irk- 9682' —14-1/2"I-ES X NP,D=3.813' 9874' —4-1/2*FES X NP,0=3.813' 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, —I 9899' .0152 bpf,Et=3.958" 4-1/2'TBG STUB(COMPLETION RUN 01/07/14) --{ 9904' 1�' 9914' H 9-5/8"X 4-1/2'UNIQUE OV I�FT;`"xHOT 9942' H3.70-DEPLOYMENT SLV,ID=3.00" TOP OF CEMENT H 9942' r! 99d7' —4-1/2'BKR FBRASSY,8=4.750" 11 BEHIsCI CT LNR 1 9961' —13-1/2"HES X NIP D=2.813' r • 9962' 9-5/8"X 4-1/2"BKR SAB PIR,D=4.75" �w/BKR K-22 ANCHOR(BEHIND CT LNR) 9967' —17"MLLOUT EXTENSION.ION,D=6.00" TUBING PUNCH — 9966'-9971' 1 9973' H7"X 4-1/2"XO,8=3.958" Y. 3-1/2"LHR,9.3#,L-80 STL,.0087 bpf,D=2.992' -1 9994 V 4-1/2"WHIPSTOCK(05/24/07) 10010'ELMD r:•, .' 4-1/2"TBG-PC,12.6#,L-80 LTCA13-MOD, —{ —10010 Yy. . .'"•C .0152 bpf,0=3.958" c 9994' —13-1/2"X 3-3/16'XO,D=2.786' 9-5/8"CSG,47#,S00-95 BTC,ID=8.681" —{ -10010 'x" A MIL LOUT WINDOW(02-18B)10010'-10029' PERFORATION Sti RY REF LOG:SLB MGR/CCL/CNL ON 06/09/07 10437' H3-3/16"X 2-7/8"XO,8=2.377' ANGLE AT TOP PERF.88°@ 10650" i, 411:1 /v/ .; Note:Refer to Production DB for historical pert data F ; +*M SIZE SPF INTERVAL Opn/Sqz SHOT SQZ r.} }} 2" 6 10650-10880 0 06/09/07 � , 2" 6 10910-11030 0 06/09107 I'+'.' .{ .�.�. PBTD 12169'ELMD 2" 6 11050-11150 0 06/09/07 #. 2" 6 11305-11330 0 06/09/07 �,t•�.i6 2' 6 11420-11480 0 06/09/07 3-3/16'LNR,6.2#,1-80 TC*, 10437' 2" 6 11522-11532 0 06/09/07 2" 6 11760-12110 0 06/09/07 .0076 bpf,ID=2.80` X44;1 401, 2-7/8'LHR,6.4#,L-80 STL,.0058 bpf,D=2.441" —{ 12205' '' ., DATE REV BY COMVENTS DATE REV BY COMMENTS PRUDHOE BAY MT 09129/80 PKR 176 INITIAL COMPLETION 01/21/14 PJC UPDATE GLM#4(OCR/RKF) WH.L: 02-188 09/04/87 N35 RWO 01/24/14 CON/PJC GLV C/O FERIVIT No:'061860 08/17/95 N35 CTD SIDETRACK(02-18A) 01/26/14 CJNY PJC ROLL XX FLOG API No: 50-029-20454-02-00 06/07/07 JGS CTD SIDETRACK(02-186) 01/30/14 PJC FERF CORRECTION SEC 36,T11 N,R14E,96'RE&764'FWL 01/09/14 DOYON 14 RWO 01/13/14 SM JMD ODE FINAL APPROVAL BP Exploration(Alaska) 4 • • 0,14, 1,7„--. THE STATE Alaska Oil and Gas ��►9� 0 f lr jT /� = ALAS servation Commission GOVERNOR SEAN PARNELL C)'°' ,.�w� 333 West Seventh Avenue Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1 433 ck '7 �NHc� S t Fw. b G LQ� Fax: 907.276.7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. Q P.O. Box 196612 1(9 p Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-18B Sundry Number: 313-558 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 4If / athy . oerster Chair, ommissioner DATED this day of October, 2013. Encl. STATE OF ALASKA U �� RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION to" OCT 2 2 2013 • APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 AOGCC 1. Type of Request: ❑Abandon '®Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved Program ❑Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ❑Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ❑Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. ❑Exploratory ❑Stratigraphic 206-186 • 3. Address: ®Development.-❑Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-20454-02-00• 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 02-18B' Will planned perforations require a Spacing Exception? ❑Yes ®No • 9. Property Designatior 10. Field/Pool(s): ADL 028308&028307- Prudhoe Bay Field/Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 12205' ' 8834' • 12171' ' 8832' • None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1530 520 Surface 2697' 13-3/8" 2697' 2697' 4930 2670 Intermediate 10010' 9-5/8" 10010' 8589' 6870 4760 Production Liner 2263' 3-1/2"x 3-3/16"x 2-7/8" 9942'-12205' 8529'-8834' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10650'- 12110' • 8834'-8829' 4-1/2", 12.6# L-80 10010' Packers and SSSV Type: 9-5/8"x 4-1/2" Baker SAB Packer Packers and SSSV 9962'/8546' • MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: • ®Description Summary of Proposal ®BOP Sketch • ❑Detailed Operations Program ❑Exploratory ❑Stratigraphic-®Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation: November 1,2013 ❑Oil ❑WINJ ❑WDSPL ❑Plugged 16. Verbal Approval: Date ❑Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representative: ❑WAG ❑SPLUG ®Suspended• 17. I hereby certify that the fore.•ing is true and correct to the best of my knowledge. Contact: Ron Phillips,564-5913 Printed Name: Jody 'e• i_ Title: Engineering Team Leader mail: Ron.Phillips @bp.com Signatur�_ 1 ' Phone: 564-4711 Date: 'O 2 Ti 3 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness �`� Sundry Number: S. ❑Plug Integrity BOP Test ❑Mechanical Integrity Test ❑Location Clearance Other: D F f-r-i i-p 3 5-6 G S / � Li-cf- v)a fr pivsc 121 g/No OCT 2 9 0 , Spacing Exception Required? ❑Yes Ll�J No Subsequent Form Required: /0�•- 4-(2 7 APPROVED BY Approved By: - ?'% jlJ4.■ COMMISSIONER THE COMMISSION Date: /0 ZS— Form 10-403 Revised 11 2012 I Submit In Duplicate L 1�ApproveORlG5t1if0t.0h1th15 i from the date of approval ���j 1 1a♦ (1J S w • To: Alaska Oil & Gas Conservation Commission From Ron Phillips by CTD Engineer Date: October 15th, 2013 Re: 02-18B Sundry Approval Sundry approval is requested to plug the 02-18B perforations as part of the drilling and completion of proposed 02-18C coiled tubing sidetrack. History and current status: 02-18 was originally drilled in 1980 as an Ivishak producer. It has been CTD sidetracked twice with the last CTD sidetrack occurring in 2007. A hole in the tubing was discovered in 2009. A patch was successfully set and the well produced until 2010 when 2 additional leaks were discovered. 02-18B is an inoperable well and is not economic to fix the well for the remaining reserves of the current sidetrack. The proposed sidetrack will access -40 acres in the northern area of DS 02. Proposed plan: Sidetrack 02-18B to the 02-18C location using Nordic 1 Coiled Tubing Drilling rig on or around February 1St, 2014. The 02-18C sidetrack will exit the existing 3-3/16" liner and kick off in Zone 2 and land in Zone 1. This sidetrack will be completed with a 2-3/8" L-80 liner and cemented in place. This Sundry covers plugging the existing 02-18B perforations via the 02-18C primary liner cement lob and a liner top packer if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. cviscw. wei, prod .es q 70000-1- 604 14.c4 2o ova scrip?, 11)4c0" T +.r I c /awe 4..e�4 E-' _ 01:-;/ 7�it f in co jet i�f c 4� l e n2 -ofri//ed 1b Cc / �°c.- ,.� C- �OriJ P CRif o fecOrer> 4-o 4/5 por '04 t%s��j Pre-Rig Work(scheduled to begin November 1St, 2013) 1. S Pull ball, rod, and RHC plug body. 2. S Drift for WS. 3. E Run Gyro to reduce positional uncertainty. 3. E Set 3-3/16" mono-bore WS. (Retrievable) 4. V PT MV, SV, WV. Set BPV. 5. 0 Remove wellhouse and level pad Rig Work(scheduled to begin February 1St, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,415psi) 2. Mill 2.74"window at 10,220' and 10' of rathole. 3. Drill build: 3.0" OH, 172' (25 deg DLS planned). 4. Drill lateral: 3.0" OH, 2350' (12 deg DLS planned). 5. Run 2-3/8" liner leaving TOL at 9,900' MD. 6. Pump primary cement job: 11.8 bbls, 15.8 ppg, TOC at 9,900' MD. * 7. Perform liner cleanout and MCNL/GR/CCL log. 8. Test liner lap to 2400 psi. 9. Perforate liner based on log interpretation (-1200'). 10. Freeze protect well to 2500' MD. 11. Set BPV; RDMO. *Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline as needed if liner lap pressure test fails.* 4. ASRC flowback/well test *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Ron Phillips CTD Engineer 564-5913 CC: Well File Joe Lastufka Note: As agreed with teAOGCC via 9/26/13 corresp deuce, all pre-rig work leading-up to the PTD activity must be listed in the 10-403 approval request. However, some of the activities may not be specifically related to the 10-403 plugging request. So, for those steps associated with the permanent plugging of the existing completion or for those steps which are permanent changes to the wellbore (cannot be reversed-- for example, non-retrievable whipstocks), 10-403 approval is required before proceeding. These steps are noted by "Yes" in the 10-403 column. Required Permit? Pre-Rig Work(scheduled to begin November 1St,2013) 10-403 PTD 1. S Pull ball, rod, and RHC plug body. No No 2. S Drift for WS. No No 3. E Run Gyro to reduce positional uncertainty. No No 3. E Set 3-3/16" mono-bore WS. (Retrievable) No No 4. V PT MV, SV, WV. Set BPV. No No 5. 0 Remove wellhouse and level pad No No Required Permit? Rig Work(scheduled to begin February 1St, 2014) 10-403 PTD 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,415psi) Yes Yes 2. Mill 2.74"window at 10,220' and 10' of rathole. Yes Yes 3. Drill build: 3.0" OH, 172' (25 deg DLS planned). No Yes 4. Drill lateral: 3.0" OH, 2350' (12 deg DLS planned). No Yes 5. Run 2-3/8" liner leaving TOL at 9,900' MD. No Yes 6. Pump primary cement job: 11.8 bbls, 15.8 ppg, TOC at 9,900' MD. Yes* Yes 7. Perform liner cleanout and MCNL/GR/CCL log. No Yes 8. Test liner lap to 2400 psi. No Yes 9. Perforate liner based on log interpretation (-1200'). No Yes 10. Freeze protect well to 2500' MD. No Yes 11. Set BPV; RDMO. No Yes *Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline as needed if liner lap pressure test fails.* 4. ASRC flowback/well test *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Ron Phillips CTD Engineer 564-5913 ;z CC: Well File -w°w • --a _..�... Joe Lastufka ' WEE= 6"X7'RC • WBIFEAD= GRAY SAF 'NOTES: WELL ANGLE>70°@ 10340'•" ACTUATOR= BAKER O INITIAL&"A"WELLBORES NOT SHOWN BELOW NTIAL KB.mmELE 64' WHIPSTOCK*** BF.ELEV= KOP= 10010' Mx Angle= 97'®11139' 20"COO, — 80' _ Fi 40 2207' -4-1/7'OTIS HRQ SSSV NP,D=3.813" Datum TVD= 8800'SS D=19.124° 13-3/8"CSG,72#,N-80,D=12.347" —I 2697' ■ Minimum ID = 2.377" @ 10437' GAS LIFT MANDRELS gii II MD TVD DEV TY FE®LA TO-I FORT DATE 3-3/16" X 2-7/8" XO 0 9878 8472® FES ''DMY RK 0 08/14/09 'ST#1 HAS DMY w/EXTENDED FKG TOP OF CEM13 T -- 9942' , 1;1 9947 —3.70'DEPLOYMENT SLV,D=3.00" 1 ►1 • •I• 1 VI t994T I—41/2"BKR PBR A SSY,D=4.750" 1 BEI-01)CT LM '1 11 0 9 9 6 1' H 3-1/2"FEE,X NP,D=2.813" 4 4 1 ►tl ►ti 1 !1 4.1. 9962' —9-5/8'X 4-1/2"BKR SAB PKR,D=4.750' e' Al BEfiND CT LNR TUBrJG PUNCH - 9966' -9971' II!,, !l, ` 'eft 7• reef 44.1 ►1i 1i1i ►il'0 i A 3-1r2"LNR 9.3#,L-80 STL,.0087 bpf,D &!�"=2.992' — 9994' #�'1�' 1,{,4,+, 9994' -3-1/2"X 33/16"XO,D=2.786' 411i 111/0 104 114*, 14111 4 t Ittllttt# 4111 ►t/t1 104 tl.tt 41101 ►t/I1. M LLOUT WrVDOW(02-18B) 10010'- 10029' Wt-ISTOCK - 10010' ELM D 4 011 111•1 ',N1/ ►.•N/ 4-12'TBG-PC, 12.6#,L-80,.0152 bpf,I)=3.958' — 10068' ∎t4�14f1 4-+ - 011 •� 10437' —3-3/16'X 2-7/B'XO,ID=2.37T 9-516-CSG,47#,L-80/SOO-95,D=8.681" H 10090' *Al t�t . 4v�'v�t�1 PERFORATION SUMMA RY •61 0,1 REF LOG SLB MGwOCL/CNI ON 06/09/07 k4 1*t#1 ` ANGLE AT TOP PERE:88°@ 10650' �,4,f 4.1 lilt Note:Refer to Roduction DB for historical pert data *t#1'�t 4t4t&7.74141 \ 11111w •i��,47 SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10650- 10880 C 06/09/07 2' 6 10910- 11030 C 06/09/07 3-3/W LM R,6.2#,L-80 TCII,.0076 bpf,D=2,80' — 1043T 2" 6 11050- 11150 C 06/09/07 Ft3TD 'r 12169'ELMD 2" 6 11305- 11330 C 06/09/07 2' 6 11420- 11480 C 06/09/07 2-7/8"L142,6.4#,L-80 STL,.0058 bpf,ID=2.441" — 12205 2' 6 11522- 11532 C 06/09/07 2" 6 11760.- 12110 C 06/09/07 DATE REV BY COMMITS DATE REV BY CX)MENTS PRUDHOE BAY tNI 09/29/80 PKR 176 INITIAL COMPLETION 0421/12 JC C/PJC Il'8±CIO(4/10/12) WELL: 02-188 08/17/95 1135 CTD SIDETRACK(02-18A 06/04/12 MSS/JMD FULLED PATCWPLUG,SET XX PLUG(6/: FERMI No: 206186 06/09/07 JGS CTD SIDETRACK(02-188 06/19/13 GJB/PJC PULL/RESET XX PLUG(06/16/13) AR No: 50-029-20454-02-00 05/15/10 KJB/SV SET BP(05/08/10) 08/15/13 WS/JMD PULLED XX PLUG(08/02113) SEC 36,T11 N,R14E,4311'FEL&95'FP& 0326/11 BSE/PJC PULL IBP(03/15/11) 04/05/11 TTW/PJC SET BP(04/01/11) _ BP Exploration(Alaska) TREE ri 6"X 7"FMC WELLHEAD= GRAY 02-18 SAFONOTES: WELL ANGLE>70°@ 10340'*** ACTUATOR= BAKER C INITIAL&"A"WELLBORES NOT SHOWN BELOW (NEPAL KB.ELE 64' WHIPSTOCK*** BF.ELEV= KOP= 10010' H VI Max Angle= 97°@ 11139' 20"COND, - l 80' j Datum MD= NA 94#,H-40 I 2207' —{4-1/2"OTIS HRQ SSSV NIP,D=3.813"0 L Datum TV D= 8800'SS ID=19.124" RWO to cut, pull, install new tubing 13-3/8"CSG,72#,N-80,ID=12.347" —j 2697' w/4-1/2"x 9-5/8"wedges A Minimum ID =2.377" @ 10437' A GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3-3/16" X 2-7/8" XO ( 1 9878 8472 27 HES *DMY RK 0 08/14/09 *ST#1 HAS DMY w/EXTENDED PKG i TOL in tubing tail—9900' TOC to TOL TOP OF CEMENT — 9942' ,I �.1 9942' H 3.70"DEPLOY M6'1T SLV,ID=3.00" !1 �1 I Proposed CTD Sidetrack PI I 9947' �4-1/2"BKRPBRASSY,D=4.750" BIND CT LN 9961' H 3-1/2"HES X NIP,ID=2.813" 9961' H 3-1/2"XX PLUG(06/16/2013) •■ 9962' 9-5/8"X4-1/2"BKR SAB PKR,ID=4.750" "# 111 REBIND CT LNR TUBING PUNCH H 9966' -9971' .� III, 0II*1 11∎•1 0II 1. III II.I1 4 4�1 l*11001 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992" H 9994' ��I���� �.1 I.�. 9994' --I 3-1/2"X 3-3/16"XO,D=2.786" 401 ••••• 4 III II•IIIII 4 III II••III/ 404 1 II•I•I•I• MILLOUT WINDOW(02-18B)10010'-10029' WHIPSTOCK --I 10010' ELMD 401 ►•••• 404 4,I• 4-1/2"TBG-PC,12.6#,L-80,.0152 bpf,ID=3.958" — 10068' 0114 t; 01;'∎�.�,., 10220' TOWS 3-3/16"Monobore 9-5/8"CSG,47#,L-80/500-95,ID=8.681" — 10090' �1I��� =���I�1 2-3/8" L-80 liner to TD (12,762') PERFORATION 1 •• 4', deg REF LOG:SLB MG CC CNL ON 06/09/07 , : ♦ ANGLE AT TOP PERF:88°@ 10650' . •I• ` ..•����"V Note:Refer to Production DB for historical pert data 7IYI�I�I4/�I�I�I�I�I41 \CIBP set pre RWC' 24,,, 'DD SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10650-10880 06/09/07 10437' H 3-3/16"X 2-7/8"XO,D=2.377" 2" 6 10910-11030 C 06/09/07 2" 6 11050-11150 C 06/09/07 2" 6 11305-11330 C 06/09/07 2" 6 11420-11480 C 06/09/07 3-3/16"LNR,6.2#,L-80 TCII,.0076 bpf,ID=2.80" —{ 10437' 2" 6 11522-11532 C 06/09/07 2" 6 11760-12110 C 06/09/07 PBTD H 12169' ELMD 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,ID=2.441" H 12205' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY MET 09/29/80 PKR 176 INITIAL COMPLETION 04/21/12 JCC/PJC TREE C/O(4/10/12) WELL: 02-18B 08/17/95 N35 CTD SIDETRACK(02-18A 06/04/12 MSS/JMD PULLED PATCH/PLUG,SET XX PLUG(6/i PERMIT No:°206186 06/09/07 JGS CTD SIDETRACK(02-188 06/19/13 GJB/PJC PULL/RESET XX PLUG(06/16/13) API No: 50-029-20454-02-00 05/15/10 KJB/SV SET IBP(05/08/10) SEC 36,T11N,R14E,4311'FEL&95'FNL 03/26/11 BSE/PJC PULL IBP(03/15/11) 04/05/11 TTW/PJC SET IBP(04/01/11) BP Exploration(Alaska) t • • . i® 1,1 i .—I S o � °' Ill'� 2 � � m LLd 8 a s sf �a g 111 �; m VI Y IlEll ea ip 2 � r< ° I ei g s rill rip 0 1 g C9 C m 1 CI ,t, IIOI 1 = 1 J o0 I + 11,, 111 � r I i �\ a 11 _ 11 .f.ci Z i I Y ® _� II!! 1 111 I , iIQ � I JJ C j 1 ti 111 111 I m'oo Z UC9 �1, U Uin , � Nt I > I 111 111 Q I w ty a I. 111 U I W LL N z o: I •• •• N 111 11 Il •U I _ ; 1 t ■ o rc . a' v MI� - g • • W ■ 2 ,1 i ce U " 22 WM t a CL I < g — P:pm- Ill ------ J 1 sc, Q I U= 0 1 0 I p C n 1 , o 0 04E0 T ci a N a H I u Ili ° e y f1 .7 1 II,wow m I a [ _ PHI II III _ li 1 1I I Iii, 11 v"i I II� m I 4 ry o _ e CO) • n . 1 11 rc 11i1 ao r ~ I 11111 alt-i1I ill- s I II i 4 • Page 1 of 1 Subject: FW: INTENT PLUG for RE-DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE-DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE-DRILL WELLS (IPBRD)Type Work Code in RBDMS 1. When a Form 10-403 is submitted requesting approval to plug a well for redrill,the initial reviewer(Art or Steve D.)will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked,we will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2. On the Form 10-403 if"Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve J D. will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10-403 with a check in the "Plug for Redrill box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4, When Steve McMains receives any Form 10-407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re-drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10-407. Steve will also change the status on the 10-407 form to SUSPENDED, and will date and initial his change. If Steve does not see the"Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10-407 into RBDMS. 5. When the Form 10-407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. „, , ,-, nri - i__..-- T._ 7 TATTDATT DT TT('`_ F..DV.T1DT /1/i/7(11') STATE OF ALASKA ALA OIL AND GAS CONSERVATION COM•ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations U Perforate U Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Stimulate - Frac ❑ Waiver ❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Stimulate - Other ❑ Re -enter Suspended Well ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development el Exploratory ❑ 206 -186 -0 3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20454 -02 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028307 PBU 02 -18B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 12205 feet Plugs measured 9961 feet true vertical 8834.02 feet Junk measured None feet Effective Depth measured 9961 feet Packer measured 9962 feet true vertical 8545.48 feet true vertical 8546.37 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 94# H-40 28 - 108 28 - 108 1530 520 Surface 2670 13 -3/8" 72# N -80 27 - 2697 27 - 2696.56 4930 2670 Intermediate None None None None None None Production 10003 9 -5/8" 47# L -80 26 - 10029 26 - 8606.36 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment {� See Attachment See Attachment Perforation depth Measured depth See Attachment feet SCANNED MAR 0 4 2.013. True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" TBG -IPC, 12.6"1 25 - 10029 25 - 8606.36 Packers and SSSV (type, measured and true vertical depth) 4 -1/2" Baker SAB Perm 9962 8546.37 Packer None None None SSSV 12. Stimulation or cement squeeze summary: EC E IV Y ED Intervals treated (measured): . AUG 21 2012 Treatment descriptions including volumes used and final pressure: ?OGCC 13. Representative Daily Average roduction or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 514 36365 41 0 1307 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development Q " Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil .. 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Prepared by Nita Summerhays 564 -4035 Printed Name Nita Summerhays Title Petrotechnical Data Technician Sig nature �.f,� Phone 564 -4035 Date 8/16/2012 Form 10-404 Revised 10/2010 R DM ' • • 2 2 zei d " 1 `" ' Submit Original Only • • Daily Report of Well Operations ADL0028307 ACTIVITYDATE S 1 A' �� • . _ V• secure we DRIFTED TO TOP OF PATCH W/ 3.80" G -RING & TAGGED @ 7782' SLM 6/1/2012 * * *CONT. ON 6/2/12 WSR * ** ** *CONT. FROM 6/1/12 WSR ** *(secure well) PULLED BKR KB PATCH FROM 7782' SLM/ 7805' MD (missing two elements) RAN 3.70" 3 PRONG WIRE GRAB TO DEP SLV @ 9918' SLM/9942' MD (no elements recovered) RAN 3.25" LIB ON 3.70" BARBELL TO DEP SLV @ 9923' SLM/9942' MD (possible element on dep sly) RAN 2.60" 3 PRONG WIRE GRAB 10' INTO DEP SLV @ 9923' SLM/9942' MD (no elements recovered) RAN 2.70" CENT., 2.50" LIB TO IBP @ 9960' SLM/ 9972' MD (slight impression of IBP fishneck) 6/2/2012 ** *CONT. ON 6/3/12 WSR * ** ** *CONT. FROM 6/2/12 WSR ** *(secure well) RAN 2.5" P- BAILER TO 9960' SLM/ 9972' MD(no pieces of elements recovered) RAN 2 -1/8" EQ. SLEEVE TO 9960' SLM/ 9972' MD PULLED BKR 2 -1/8" IBP FROM 9960' SLM/9972' MD (all elements recovered) BRUSHED X -NIP @ 9961' MD W/ 3 -1/2" BRUSH & 2.80" GAUGE RING SET 2.81" XX PLUG IN X -NIP @ 9945' SLM/9961' MD ATTEMPT CMIT -TxIA, RAN OUT OF FLUID @ 1050psi 6/3/2012 ** *WELL LEFT S/I DSO NOTIFIED * ** T /I /0= 600/68073 Temp= Sf CMIT -TxFA * *PASSED" to 2000 psi ( Re- sucure) Pumped 10.66 bbls down TBG to achive test pressure. 1st 15 minutes T /IA lost 13/24 psi. 2nd 15 minutes T /IA lost 7/16 psi. Total T /IA loss in 30 minutes= 20/40 psi. Bled TxIAP ( -9.8 bbls). Well left S/I notified pad DSO upon departure. FWHP = 654/667/2. S/W /SSV = C 6/6/2012 M /IA/OA = 0 FLUIDS PUMPED BBLS 27 DIESEL 10 CRUDE 37 TOTAL • • Perforation Attachment ADL0028307 Perf Opera Meas Meas SW Operation tion Depth Depth TVD Depth TVD Depth Name Date Code Top Base Top Base 02 -18B 10/3/09 BPS 7823 7824 6851.71 6852.43 02 -188 12/2/09 BPP 7823 7824 6787.71 6788.43 02 -18B 8/15/09 BPS 9936 9937 8459.27 8460.16 9,9,6 _9937„845_9_,27_84_60. 02 -1)9¢ 6k3/12 BPS 9961 j110 8481.48 8765.05 02-18B' OS 9915 ' .14 8770.1 02 -188 6/2/12 BPP 9973 10650 8492.14 8770.04 02 -18B 5/8/10 BPS 9980 9981 8498.36 8499.25 02 -18B 3/15/11 BPP 9980 12110 8498.36 8765.05 02 -18B 6/9/07 PER 10650 10880 8770.04 8774.18 02 -18B 6/9/07 PER 10910 11030 8774.73 8773.8 02-188 6/9/07 PER 11050 11150 8773.8 8768.47 02 -18B 6/9/07 PER 11305 11330 8760.11 8759.91 02 -18B 6/9/07 PER 11420 11480 8761.18 8758.39 02 -18B 6/9/07 PER 11522 11532 8758.52 8758.68 02 -18B 6/9/07 PER 11760 12110 8760.5 8765.05 AB ABANDONED MIR REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP PULLED MLK MECHANICAL LEAK BRIDGE OPEN BPS PLUG SET OH HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF Casing / Tubing Attachment ADL0028307 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 94# H -40 28 - 108 28 - 108 1530 520 LINER 52 3 -1/2" 9.3# L -80 9942 - 9994 8528.6 - 8574.8 10160 10530 LINER 443 3- 3/16" 6.2# L -80 9994 - 10437 8574.8 - 8830.86 LINER 1768 2 -7/8" 6.4# L -80 10437 - 12205 8830.86 - 8834.02 10566 11165 PRODUCTION 10003 9 -5/8" 47# L -80 26 - 10029 26 - 8606.36 6870 4760 SURFACE 2670 13 -3/8" 72# N -80 27 - 2697 27 - 2696.56 4930 2670 TUBING 10004 4 -1/2" TBG -IPC, 12.6" L -80 25 - 10029 25 - 8606.36 8430 7500 • • 1 7" FMC Am/ki - _ X GRAY O INITIAL & "A" WELLBORES NOT SHOWN BELOW ACTUATOR = BAKB2C KB �� _ ,__* 64' WHIPSTOCK * ** BF. BEV= KOP = __ __ _ 10010' Max Angle 97° @ 11139' 20" CON), H 80' J Datum kA3 = NA 94#, 1-4-40 2207' — 14112" OTIS FEU SSSV NI D = 3.813" DatumTVD= 8800' SS D= 19.124" 13 -3/8" CSG, 72#, N-80, D = 12.347" H 2697' GAS LFT MANDRELS ST ND ND DEV TYPE VLV LATCH FORT DATE Minimum ID = 2.377" @ 10437' 1 9878 8472 ®p * DMY RK 0 08/14/09 3- 3/16" X 2 -7/8" XO *ST #1 HAS DMY w /EXTENDED PKG TOP OF CEM31T 1 9942' 1 ,1 1 ►1 ►1 9942' — 3.70" DEPLOY MNEW SLV , ID = 3.00" I 1 ► 9 1 9947' 1 4-1/2" BKR PBRASSY, D = 4.750" • • ► B&IID CT Lift ' 1 11' • 1 • �1 '' v 9961' 3 HES X NP, ID= 2.813" I 0 01 9961' H 3-1/2" >0< PLUG (06/03/12) I • • 1 V l � AO 9962' I — 9-5/8" X 41/2" BKR SAB PKR, D = 4.750" .; A m Bl3iND CT LNR IN TUBG PUNCH I 9966' - 9971' E i ►1 III X * X1 1 ► #0 1 1 1 1 1 1 1 1 1 13-1/2" LM 9.3#, L -80 STL, .0087 bpf, ID = 2.992" 9994' i i t 9994' 3 X 3 -3/16" XO, D = 2 -786" I 111 11'11'' .1 1 111144 4 'kV, N ►1/ ∎1 1 ► MLLOUT WINDOW (02 -18B) 10010' - 10029' 01 114N WI � 1 TOac �— 10010' ELMD 1 ► 414 •11 IV 441 4-112" TBG -PC, 12.6#, L -80, .0152 bpf, D = 3.958" 10068' ∎1 1 + � 111 `� 10437' 1-13 3/16" X 2- 718" XO, D = 2.377" 9-5/8" CSG, 47 #, L- 80/SOO -95, D = 8.681" 10090' kV 1 - i 1 X e e ■•••■ PERFORATION SUMMARY 1111 11111 REF LOG: SLB MGR/CCUCNL ON 06/09/07 ��1I • ;1;11 Illor ANGLE AT TOP PERF: 88° @ 10650' ' ••■ lilt Note: Refer to Production DB for historical perf data • • • • • • • • • • SIZE SPF INTERVAL OpnlSgz DATE 4 f. 1 � 11, p,i; 2° 6 10650 - 10880 C 06/09/07 2" 6 10910 -11030 C 06/09/07 3..3/16" LN2, 6.2#, L -80 TCII, .0076 bpf, D = 2.80" —{ 10437' 2' 6 11050 - 11150 C 06/09/07 2° 6 11305 - 11330 C 06/09/07 IPBTD I 1 12169' ELMD 2° 6 11420 - 11480 C 06/09/07 2" 6 11522 -11532 C 06/09/07 2 -7/8" LM , 6.4#, L -80 STL, .0058 bpf, ID = 2.441" H 12205' 2" 6 11760 -12110 C 06/09/07 DATE REV BY COMMITS DATE REV BY COM ENTS PRUDHOE BAY UNT 09/29/80 PKR 176 ORIGINAL DRILLED 04/21/12 JCC/ PJC TREE C/O (4/10/12) WELL: 02 -18B 08/17/95 N35 CTD SIDETRACK (02 - 18A 06/04/12 MSS/JMD FULLED PATCWPLUG, SET )0 RUG (6/: PERMIT No: '2061 06109/07 JGS CTD SIDETRACK (02 - 18B) API No: 50 029 - 20454 - 00 05/15/10 KJB/SV SET IBP (05/08/10) SEC 36, T11N, R14E, 4311' FR & 95' FN- 03/26/11 BSE /PJC PULL BP(03/15/11) 04/05/11 TTW /PJC SET IBP (04/01/11) BP Exploration (Alaska) • • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 4 5 P ) 2i.1; August 22, 2011 ikbe AUG . Mr. Tom Maunder 4 .Qjy 3 1 t qi Ala Oil and Gas Conservation Commission ' G s8C 333 West Anchorage, t o Alaska 99501 Inc —111. r$ $f! jj Subject: Corrosion Inhibitor Treatments of GPB DS -02 1) tr? ✓ t S13 Dear Mr. Maunder, d Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS- 02 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS -02 Date: 07/21/2011 Vol. of Corrosion Initial top of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal 02-01B 1971400 500292044201 Sealed NA Sealed N/A NA NA 02 -02A 1971680 500292007401 5' NA 5' N/A 74.80 5/20/2011 02 -036 2002170 500292007702 38' 11.0 4" 7/13/11 3.40 7/21/2011 02 -04A 1961580 500292006401 0.2 NA 0.2' N/A 1.70 4/27/2011 02 -05A 2030820 500292008101 4.5' NA 4.5' N/A 68.00 5/19/2011 02 -06B 2040850 500292008602 6' NA 6' N/A 20.40 6/2/2011 02 -07A 1981070 500292015401 Sealed NA Sealed N/A NA NA 02 -08B 1980950 500292015502 Sealed NA Sealed N/A NA NA 02 -09C 2071390 500292015303 Sealed NA Sealed N/A NA NA 02 -10B 2000640 500292016302 Sealed NA Sealed N/A NA NA 02 -11A 1981260 500292027301 Sealed NA Sealed N/A NA NA 02 -12B 2070580 500292027702 Sealed NA Sealed N/A NA NA 02 -13B 2012430 500292043302 Sealed NA Sealed N/A NA NA 02 -14A 2031250 500292044601 Sealed NA Sealed N/A NA NA 02 -15A 1960420 500292044701 Sealed NA Sealed N/A N/A NA 02 -16C 2070870 500292044803 Sealed NA Sealed N/A NA NA 02-176 02 -18 2051300 500292045302 Sealed NA Sealed N/A NA NA B 2061860 500292045402 Sealed NA Sealed N/A NA NA 02 -19 1811860 500292069300 Sealed NA Sealed N/A NA NA 02 -20 1820290 500292072100 Sealed NA Sealed N/A NA NA 02 -21A 2010990 500292078101 Sealed NA Sealed N/A NA NA 02 -22B 2100520 500292074002 Sealed NA Sealed N/A NA NA 02 -23A 2000530 500292079501 0.5 NA .5' N/A 5.10 5/19/2011 02 -24A 2040300 500292074401 0.5 NA .5' N/A 3.40 5/19/2011 02 -25A 2080910 500292076601 0.2 NA .2' N/A 0.85 5/19/2011 02 -26C 2050190 500292077403 0.2 NA .2' N/A 0.85 5/19/2011 02 -27A 1990930 500292199401 12.5' 8.5 3" 7/8/11 1.70 7/12/2011 02 -28A 2041640 500292201201 Sealed Sealed N/A NA NA 02 -29C 2040510 500292201103 65' Top Plate N/A NA NA 02 -30B 2001260 500292220202 Sealed NA NA N/A NA NA 02 -31A 1990150 500292222701 1.5' 1.5' N/A 11.05 5/18/2011 02 -326 2020230 500292220902 1.1' 1.1' N/A 5.10 5/19/2011 02 -336 2090450 500292221402 1' 1' N/A 8.50 6/1/2011 02 -346 2100290 500292223402 0.8' 0.8' N/A 5.10 5/18/2011 02 -35B 2060020 500292222202 1.5' 1.5' N/A 10.20 6/1/2011 02 -36A 2100780 500292287701 19.6' 11.5 5" 7/8/11 2.55 7/12/2011 02 -37 1961750 500292271700 0.1 0.1 N/A 0.85 5/18/2011 02 -38 1961610 500292270800 1.5' 1.5' N/A 15.30 5/18/2011 02 -39A 1971100 500292272100 1.5' 1.5' N/A 11.90 5/18/2011 02-40 2071620 500292337700 2.9' 2.9' N/A 25.5 5/18/2011 04/28/11 Schlumberger N0.5729 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 8 Log Description Date BL Color CD 15 -09A BBKA -00096 PRODUCTION PROFILE / — d Z 03/14/11 1 OWO/ 1 17 -06 BBKA -00094 INJECTION PROFILE 0 MI ( 46 4 03/10/11 1 r. " - , 1 C -12B BAUJ -00064 MEM PRODUCTION PROFILE 6 03/08/11 1 1�}�cc_Q ‘ " I 1 G -23B BLPO.00079 MEM PRODUCTION PROFILE '_,A, -- 03/09/11 1 10 • - iii 1 - 16 -08A BJGT - 00022 ®Gti '�0FA -- SLPO -00087 1113'tt i eiij? k 'e�MIFTZ O -- BJGT-00023 �Y ' F'•_ L -210 B LPO -00086 MEM INJECTION PROFILE • '. e�i�� Q V -105 BLPO -00091 MEM INJECTION PROFILE y' _ — '®' OF •r • V -220 BBSK -00065 INJECTION PROFILE/WFL �� t•L • 'e i�0V . —� V -212 8088.00096 MEM INJECTION PROFILE r a-11L1Y.1a7 eQ.�0�Y1irI 0 - BCRJ -00073 INJECTION PROFILE - 1A•iI i - f! 72111OFeT -- NINIMEEINIMINI BAUJ-00071 MEM INJECTION PROFILE -• 'r S:IM ' I 0 == 1T ...,,• V -217 BAUJ -00077 MEM INJECTION PROFILE ' , "" P,1 „MUM= 1 f:[ r� - 3- 05/0 -29 BG4H -00043 LDL 1 , '®' r BLPO -00092 MEM PRODUCTION PROFILE J 'Yrl°T•Yal '�.11011M!T• —_ BBSK -00057 Q�ri_i�_w _ " �r•T:rCI�� -- BCUE -00113 p +l it:©L-iL r F_ 11 -30 BD88 -00097 MEM INJECTION PROFILE "[��Ytk�� �-- 1 MN 04-11A AWJI -00134 INJECTION PROFILE OI nr4. -L 1 BG4H -00044 PRODUCTION PROFILE _.• oeLaO- D -266 BMSA -00009 11E0111111111P1MI .� • w 1NIIIMIN0 -- 02-18B BLP0.00087 MEM PRODUCTION PROFILE - LTC• 1 -- Z -20 BP50 -00010 GLS n --- • 0 03/29/11 1 r♦ x 1 Y -29A BCUE -00122 MEM LDL t —Tea ® ( y c / 03/20/11 1 Do- 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd Anchorage, AK 99503 -2838 r) (1 ft • 04/28/11 Schlumberger N0.5729 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 15 -09A BBKA -00096 PRODUCTION PROFILE / 93 ^ t - 3 . 03/14111 1 • O`Mo 1 17-06 BBKA -00094 INJECTION PROFILE 0 M,(" I ,– _ 03/10/11 1 • • 'r. ' 1 C -12B BAUJ -00064 MEM PRODUCTION PROFILE °-'1 i 1 ' a Q i 1 __ 03 G -23B BLPO -00079 MEM PRODUCTION PROFILE IIIMIll . r: • BJGT -00022 [tiI. i ,,,e.. • �0 �:• • � 11111•1_— 02 -18B BLPO -00087 ILIgaNaa!marim . - IMMEINIPM IIIIIO_— MNIIIIIIIRECIMIIIINI BJGT -00023 " I :]IIIIIIIIIIIIIIIIIIII...:'T.Y. — ' ' 1111111MII0 -- BBSK -00065 • • - • � I • �OF :.`YI� � -- :.:. 00 i • •'• .. • • r ' 1 1 � r � __ • .. ii i � • V-223 BAW-M)071 MEM INJECTION PROFILE ,,,,, di i ° 03/19/11 mumgerwomigimomig IIIIMINESEIMMIN BAUD -00077 • . _ • W tr�i` »oiTOVl:70 -- 3- 0510 -29 BG4H -00043 11:21=11f7 ®�l`� 'sue -- i Y[I� a ' ' , BLP0.00092 MEM PRODUCTION PROFILE ' o�TY o_____vrip• -- i i i CBL i – 0 _ ��T•Z �O -- r MEM CBL L -�'G.� ' i B088-00097 MEM INJECTION PROFILE ^ •- `4"` ' ° a� 1 _ • • 1 i INJECTION PROFILE al, 0 ' — a - 'e '�' �0Li CT; )0 -- BG4H-00044 PRODUCTION PROFILE – _ • " IMIIMe�!?0__ D -26E BMSA -00009 IMBIEMPUYI • ' ° _S • WEINIMM0 -- :: BLPO.00087 MEM PRODUCTION PROFILE - .tt.. '®' 1111111111114TLTIRO -- Z -20 BP5G -00010 • • a. 4 03/29/11 1 _ 1 -- V-29A BCUE -00122 MEM LDL �, _ • 03/20/11 1 Win11101111 �_ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 ! 900 E. Benson Blvd Anchorage, AK 99503-2838 • i ∎Y`i,'i,, , ~~,44, ~;;~ -. ~° r ~~ ~ 2.--~~ ~ :;~~> ;~ ~ ~ ,+~. ~, ~~.. ~ ~ ~ ~ MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm Marker.doc r WELL LOG S TRANSM/1TAL PnoAcrive DiAynosTic SertvicES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Holc/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road suite C Anchorage, AK 99518 Fax: (907) 245-8952 ~ - i~~ /`~~s 7 1 J Leak Detection - WLD 09-May-10 02-1 $B 1 BL / EDE 50.029-20454-02 2) Signed Print Name: ~ ~ ~` '~ ' ! ~i 6 `.~ f Date : ~~AY i 7 2010 A PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL : adsanchorage(c~memorvlog.com WEBSITE : www.memordloa.coPn C:\Docciunerts and Settings\Diane Williams\Desk-top\Transmit_BP.docx ~~ 3 ~~~ P~toAcrive Diaqnos~ic S~~s, tac. ~F~.E L4G Tl~~4f~SM/TTAL To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 9 00 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/orTubing (nspection(Caliper/ MTl`) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska], Inc. F~etrot~hnical Data Center Attn: Joe Lastuflca LR2-1 900 Benson Blvd Anchorage, Alaslca 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West lnternational Airport Road Suite C Anchorage, AK 99518 ~• Fax: (907j 245-6952 I ~~-a ~- t~~~ ~a~ ~~~ _~ ~~ i ~ ~~~ ;;°;'~ 1) Leak Detection - WLO 04Sep-09 02-07A 2) Leak Dete¢~ion - WLD ~ 05.Sep~09 ' 02-18B ,, ; ~ ~ Signed . ~ + / Print Name: BL / EDE 50-029-2015401 BL / EDE 50~29-20454 Date PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AtRPORT R~ SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8961 Fax: (907)245-88952 E-MAIL Y~,~.._.~ __., ~_._ WEBSITE:.._~~ i ~,~ ______ C:~Documents and SetYings\Oamer\Desktop\Tcansmit_BP.docx ~ ° ~w~ DATA SUBMITTAL COMPLIANCE REPORT 6122/2009 Permit to Drill 2061860 Well Name/No. PRUDHOE BAY UNIT 02-186 Operator BP EXPLORATION (ALASK,~y INC API No. 50-029-20454-02-00 MD 12205 ND 8834 Completion Date 6/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATI~N Types Electric or Other Logs Run: MWD DIR / GR / RES, MCN! / GR / CCL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / iy e meairrmi numoer Name aca~e mea~a No start stop cn rceceivea comments D D Asc Directional Survey 11056 12205 Open 7/24/2007 Includes PB 1(10000' - 11917') Rpt Directional Survey 11056 12205 Open 7/24/2007 Includes PB 1(10000' - 11917') D C Lis 15364~eutron 9584 12022 Open 8/27/2007 LIS Veri, GR, CNT, CCL og 15364 Neutron 2 Blu 9578 12025 Open 8/27/2007 MCNL, GR, CCL, CNL (Lee Tool) 8-Jun-2007 pt LIS Verification 9696 12205 Open 2/28/2008 LIS Veri, GR, ROP, RPS, RPD ""Looks like a LAS"' D C 15950~ Gamma Ray 0 0 Open 2/25/2008 GR logs 3 in Meta Viewer. og Gamma Ray 25 Blu 10029 12205 Open 2/29/2008 GR 7-Jun-2007 og Induction/Resistivity 25 Blu 10029 12205 Open 2/29/2008 ND MPR, GR 7-Jun-2007 Log Induction/Resistivity 25 Blu 10029 12205 Open 2/29/2008 MD MPR, GR 7-Jun-2007 Log See Notes 5 Col 0 0 Open 2/29/2008 Depth Shift Monitor Plot ED C 15958~Gamma Ray 0 0 Open 2/29/2008 PB1 GR logs 3 in Meta Viewer. og Gamma Ray 25 Blu 10029 11917 Open 2/29/2008 PB1 GR 1-Jun-2007 og Induction/Resistivity 25 Blu 10029 11917 Open 2/29/2008 P61 MD GR 1-Jun-2007 I Log Induction/Resistivity 25 Blu 10029 11917 Open 2/29/2008 PB1 7VD GR 1-Jun-2007 ', Log See Notes 5 Col 0 0 Open 2/29/2008 P61 Depth Shift Monitor Plot ~ ~ DATA SUBMITTAL COMPLIANCE REPORT 6/22/2009 Permit to Drill 2061860 Well Name/No. PRUDHOE BAY UNIT 02-18B Operator BP EXPLORATION (ALASK~y INC API No. 50-029-20454-02-00 1ZZUb i vu utss4 compieuon uate bnuizwi GOfllpleLlOf1 JL8SU5 I-lllL GUff@f1L Ji2LUS I-VIL ui~ rv Rpt LIS Verification 9696 11917 Open 2/29/2008 PB1 LIS Veri, GR, ROP, RPS, RPD ~sRpt LIS Verification 9696 12205 Open 5/21/2008 LIS Veri, GR, ROP, RAD, ~ i RAS, RPD, RPS D C Lis 16278~'fnduction/Resistivity 9696 12205 Open 5/21/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS pt LIS Verification 9696 11917 Open 5/21l2008 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 'ED C Lis 16279~' Induction/Resistivity 9696 11917 Open 5/21/2008 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS ~ Log Gamma Ray 25 Col 10029 12205 Open 5/21/2008 MD GR Log Induction/Resistivity 25 Col 10029 12205 Open 5/21/2008 MD Res, GR Log Induction/Resistivity 25 Col 10029 12205 Open 5/21/2008 ND Res, GR ~ Log See Notes 2 Col 9690 12150 Open 5/21/2008 Depth Shift Monitor Plot °Log Gamma Ray 25 Col 10029 11917 Open 5/22/2008 P61 MD GR Log Induction/Resistivity 25 Col 10029 11917 Open 5/22/2008 PB1 MD MPR, GR og Induction/Resistivity 25 Col 10029 11917 Open 5/22/2008 P61 ND MPR, GR og See Notes 2 Col 9680 11880 Open 5/22/2008 P61 Depth Shift Montior Plot (j.og Gamma Ray 25 Col 10029 11917 Open 11/28/2008 PB1 MD GR Copy Kog Induction/Resistivity 25 Col 10029 11917 Open 11/28/2008 P61 MD MPR, GR Copy Log Induction/Resistivity 25 Col 10029 11917 Open 11/28/2008 PB1 ND MPR, GR Copy Rpt LIS Verification 9696 11917 Open 11/28/2008 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Copy D C Lis 17210 " Induction/Resistivity 9696 11917 Open 11/28/2008 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Copy Well Cores/Samples Information: Name Sample Intervai Set Start Stop Sent Received Number Comments ~ ~ DATA SUBMITTAL COMPLIANCE REPORT 6122/2009 Permit to Drill 2061860 Weli Name/No. PRUDHOE BAY UNIT 02-18B Operator BP EXPLORATION (ALASF(A) INC API No. 50-029-20454-02-00 MD 12205 ND 8834 Completion Date 6/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N ADDITIONAL IPFORMATION Weli Cored? Y ~ Chips Received? ~ Analysis '°Y'f~- Received? Daily History Received? ~~ N Formation Tops ~N Comments: Lr x,~ rw C.o~r ~ s~ 1' {,.ep t a~ r c.a~d,t. Z _ q Compliance Reviewed By: _ _ra __ Date: ~ ~ ~ ~ ~~ BAKER Mus~MEs COMPANY WELL NAME FIELD Baker Atlas PRINT DISTRIBUTION LIST BP EXPLORATION (ALASKA) INC COUNTY NORTH SLOPE BOROUGH 02-18BPB1 STATE ALASKA PRUDHOE BAY UNIT DATE I 1/19/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1442140 Copia of Copies Digital Copies of Copies Digihl EachLog ofFilm Data EachLog ofFilm Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE AK 99508 I Company EXXON MOBII. PRODUCTION CO Company Person FII,E ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 1 Company DNR - DIVISION OF OII, & GAS Company Person KRISTIN DIRKS Person Address 550 WEST 7TH AVE Address SUITE 802 ANCHORAGE, AK 99501 Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Comnleted Bv: i ~~ ~_ °~~i~+' ~ Page 1 of 1 ~ ~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 02-18BPB1 ;~ Contains the following: `; 1 LDWG Compact Disc (Includes Graphic Image files) ; 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MPR/Directional TVD Log {to follow) 1 color prints - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1442140 Corrected API Number. This Data CD replaces all previously delivered digital daxa. ~~`~~:v ~/~0~/0 Sent by: Catrina Guidry Date: 11/19%Oi~ ~~~~`~~~ ~~ '~ Received by: ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIG1vING & RETURNING OR FAXING YOUR COPY FAX: (9~7) 267-6623 ~~ BAK~R I~IG~I~S 1 IYTEQ ~ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~ ~ ~/ ~- BAKER NV6HE5 Balzer Atlas PRINT DISTRIBUTION LIST CUMYAN Y k3Y ~XYLUKAI'lUN (ALASKA) 1NC C:UUNCY NUK'1 H 5L(Jk'~; 13UKUUGH WELLNAME 02-18BPB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE SJ20/2008 THIS DISTRIBUTION LIST AUTHORIZED BY, CATRINA GUIDRY SO #: 1442140 Copies of Copies Digitat Copies of Copies Digital Each Log of Film Data Each Log of Film Da[a 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-I Address 900 E BENSON BLVD. ANCHORAGE AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AUE Address SUITE 100 ANCHORAGE AK 99501 1 Company DNR - DIVISION OF OIL & GAS Company Person KRISTIN DIRKS Person Address 550 WEST 7TH AVE Address SUITE 802 ANCHORAGE. AK 99501 Company Company Person Person Address Address Data Disseminated B~ BAKER ATLAS-PDC 17015 Aldine Wastfield Houston, Texas 77073 This Distribution List Completed By: -~~=. ~ ~y; i, . , ~DCo -< `~ ~° Page I of 1 ~ ~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7t" Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 02-18B Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) l color prints - MPR/Directional TVD Log (to follow) 1 color prints - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1442140 Sent by: Catrina Guidry ~ ~ r ~ ~ :-~ i 1 ~a~i Date: OS/2~1~1~ ,~; ._,,. Received by: Date: „ "~~ .i ! J' - _ `~ ~ _ , .,e ~ r,„ ..- z ~ _-._ . . . PLEASE ACKNOWLEDGE RECEIPT BY SIGNII~1`~ ~i°RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~ ItYTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~~(p l'~~P i~a~-~ ~ ~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 02-18BPB1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MPR/Directional TVD Log (to follow) 1 colar prints - MPR/Directional Measured Depth Log (to follow) LAC Job#: 1442140 Sent by: Catrina Guidry Date~~~~20~08~ ;,,, ' ; ~ 1 ;~ .. ~~ ,~ Received by: Date: ~ s~~i PLEASE ACKNOWLEDGE RECEIPT $`~ SI~~G & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~~~ BAK~ 11VTEQ Baker Aughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~(~-l`6~ ~~~~ ~ ~ ~~': B4KER M~/6NE5 Saker Atlas PRINT DISTRIBUTION LIST (;()MYAlVY 13Y ~XYLUKA"1'lUN (ALASKA) INC; WUN'1'Y ~1UK('H SWY~ 13UKUUCiH WELL NAME 02-18B STATE ALASKA FIELD PRUDHOE BAY UNIT THIS DISTRIBUTION LIST AUTHORIZED BY DATE Si20i2008 CATRINA GUIDRY SO #: 1442140 Copi~ of Copi~ Digital Copies of Copies Digital EachLog ofFilm Data EachLog ofFilm Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE, AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FII,E ROOM Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 9950t 1 Company DNR - DIVISION OF OIL & GAS Company Person KRISTIN DIRKS Person Address 550 WEST 7TH AVE Address SUITE 802 ANCHORAGE. AK 99501 Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfietd, Houston, Texas 77073 This Dish-ibution List Comnleted Bv: /7~/!(J~ CJ Page 1 of 1 • • (;UMYANY WELL NAME FIELD Baker Atlas PRINT DISTRIBUTION LIST f3Y ~XYLUIZA'11UN (ALASKA) 1NC (;(JUN'l Y NUK'l H SLUY~ 13U1ZUUCiH PBU 02-18B PB1 STATE ALASKA PRUDHOE BAY UNIT DATE THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1442140 2/28/2008 Copies of Copia Digital Copies of Copics Digital EachLog ofFilm Data EachLog ofFiUn Data 2 Company BP EXPLORATION (ALASKA) NC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE. AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person SALLY BURGESS Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person HELEN J. WARMAN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield. Houston, Texas 77073 This Distribution List Completed Bv: ~o~ - !~G Page 1 of 1 -~J ~ BAKER M~/6F~E5 ~ CUMYANY WELL NAME Baker Atlas PRINT DISTRIBUTION LIST 13Y ~:XYLUKA'1'1ON (ALASKA) 1NG C;UUN1'Y NUR'1'H SLUY~; IiUKUUGH rRirm-~xR STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/27/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 1442140 Copia of Copia Digital Copics of Copies Digital ~ ~ Each Log of Film DaW Each Log of FiUn Data 2 Company BP EXPLORATION (ALASKA) INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD. ANCHORAGE AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person SALLY BURGESS Person Address 800 BELL STREET Address GSC EMB 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person HELEN J. WARMAN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Comuleted Bv: ~/ _ ~~ $~ ~ Page I of 1 . • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Helen J. Warman Reference: PBU 02-18B PBl Contains the following: 1 LDWG Compact Disc Sent by: Catrina Guidr Date: OZ/28/08 Received by: Date: ~ ~~ ~~'~ ~~ , , _ , . .. . %~,:~~ ~ ~ ~_,~~~~~-z ; ~ . _ _. , ~~~=~a - , .. , , ,3: _, PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY ~'AX: f907 j 267-6623 ~P.~1~ B41(~R i~tIG1~ES 1NTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~p~ -l~~ ~ ! ~"t S`~ ~ ~~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7t" Ave. Suite 100 Anchorage, Alaska 99501 Attention: Helen J. Warman Reference: PBU 02-18B . ~~ _ ~..%~' ~ ~~3 +; e; Z008 ~ ~1 ~ C~~ C:e~nso ~or~r~ ~ A~t~ _ __ _ _ Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color prints - GR Directional Measured Depth Log (to follow) 1 color prints - MPR/Directional TVD Log (to follow) 1 color prints - MPR/Directional Measured Depth Log (to follow) i LAC Job#: 1442140 Sent by: Catrina Guidry Date: 02/27/08 Received by: ( p . ~ Date: ~ /~~ /v ~ r c PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETIIRNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~v~-~~s~- Baker Hughes INTEQ ~~~ 7260 Homer Drive ~ ~S 9~ ~y/ ~~~ Anchorage, Alaska 99518 4Y Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 ? ~ ~' ~ ~, ~. ~ ~ • 1~il,~l:~ `~, '~ 7~~~ ~C~1~1~111~~1'~4~ ~~~h~ C~ol ~ t~~s ~~~:~~. ~:~arnor~i~si~P. aa~s Alaska Data & Consulting Services ~~~~~r~~' Com an State of Alaska P Y~ 2525 Gambell Street, Suite 40o Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott 08/22/07 Well Job # Lo Descri tion Date BL Color CD OWDW-SE 11492253 RST U'Z s 17/16/06 1 1 MPF-99 11638629 CH EDIT PDC GR (USIT) _ yt 05/03/07 ~ 02-18B 11661155 MCNL al(~(~-ff(6 ~'~S3(~t~ 06/08/07 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage,Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, qK 99503-28 8 ATTN: Beth Received by: ~ ~ ~ Page 1 of 1 Fleckenstein, Robert J (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Thursday, July 26, 2007 11:33 AM To: Fleckenstein, Robert J (DOA) Cc: Saltmarsh, Arthur C (DOA) Subject: FW: PBU 02-18B / PTQ # 206-186 Per your request... Additional requested information. Top PerF MD: 10650' Bottom PerF MD: 12120' From: Hubble, Terrie L Sent: Friday, July 20, 2007 11:29 AM To: art_saltmarsh@admin.state.ak.us Subject: PBU 02-18B / PTD # 206-186 Hi Art, Please reference the following well: Well Name: PBU 02-18B Permit #: 206-186 API #: 50-029-20454-02-00 This well began Production on July 9, 2007 Method of Operations is: Flowing Date of Test: July 15, 2007 Hours Tested: 8 24-Hour Rate / Oil-Bbl: 2,046 24-Hour Rate / Gas-Mcf: 28,587 24-Hour Rate / Water-Bbl: -0- Test Rate / Oil-Bbl: 682 Test Rate / Gas-Mcf: 9,529 Test Rate / Water-Bbl: -0- Choke Size: 39 Gas-Oil Ration: 13,973 Flow Tubing Pressure: 1,505 Casing Pressure: 700 Oil Gravity-API: Unavailable ~ ~ ~t `~~~ ~' ~ ?D07 7/26/2007 -- - ,,,~ . ;~/6~'? STATE OF ALASKA ALASKA~IL AND GAS CONSERVATION COM SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ~ Oil ^ Gas ^ Piugged ^ Abandoned ^ Suspended 1b. Well Class: ;i~;~~~ ~ae~ ~ zoa,a,c 2s.,os zoAnc zs.>>o ~ Development ~ Exploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aban ., 12. Permit to Drill Number BP Exploration (Alaska) Inc. 6/10/2007 206-186 ~ 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 5/29/2007 ' S0-029-20454-02-00 ~ 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: ' ' ' 6!6/2007 ~ PBU 02-18B ' FNL, 764 FWL, SEC. 36, T11 N, R14E, UM 95 Top of Productive Horizon: 8• KB (ft above MSL): 64' ' 15. Field / Pool(s): e 4160' FSL, 925' FWL, SEC. 25, T11 N, R14E, UM Ground (ft MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Pool 138' FSL, 41' FEL, SEC. 23, T11 N, R14E, UM 12112' 8829~ 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+ND) 16. Property Designation: Surface: x- 687493 y- 5951103 Zone- ASP4 12205 i 8834 _ ADL 028307 " TPI: x- 687546 y- 5955361 Zone- ASP4 11. SSSV Depth (MD+~/D) 17. Land Use Permit: Total Depth: x- 686548 y- 5956594 Zone- ASP4 None 18. Directional Survey ~ Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): Submit electronic and rinted information er 20 AAC 25.050 N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed in ormation per 2 AAC 25.071 ): MWD DIR / GR / RES, MCNL / GR / CCL 7bP//~iYDOt/ L1° /4Y>X~ iN0 d'SYf ~T Yp ZZ. CASING, LINER AND CEMENTING RECORD CASING SETfING DEPTH MD SETTING DEPTH ND Hp~E `AMdUNT < WT,PER FL GRADE TOP BOTTOM ` TOP BOTfOM SIZE CEMENTING RECORD PULLED 20" 94# H-4 Surface 80' Surface 80' 32" 300 x Permafrost II 13-3/8" 72# N-80 Surface 2697' Surface 2697' 17-1/2" 2050 sx Fondu 400 sx Permafrost II 9-5/8" 47# L-80 Surface 1 1' Surface 8589' 12-1/4" 1650 sx Class'C' 300 sx PF'C' s-vz" x 33/16" x2-7/8" .3# / 6.Z# / 6.~ L-80 9942' 12205' 8529' 8834' 4-1/8" 140 sx Clas 'G' 23. Open to production or inject ion? ~ Yes ^ No 24.' Tusfw~ R~corio If Yes, IISt @8CI1 I (MD+TVD of Top & Bottom; Pe ~teNBI OpEtl rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 2" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 10068' 9962' MD ND MD ND 10650' - 10880' 8834' - 8838' FwaCTURE CEMENT SQUEEZE er'~ 25 ' ACi~ 10910' - 11030' 8839' - 8838' , , , . , 11050' - 11150~ $$38~ - 8832~ ~EPTH ~NTERVAL MD AMOUNT E~ KIND OF MATERIAL USED 11305' - 11330' 8824' - 8824' 2250' Freeze Protect w/ MeOH 11420' - 11480' 8825' - 8822' 11522' - 11532' 8823' - 8823' 11760' - YL'tR0% 8825' - 8829' a ' iio i 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): _ Not on Production N/A Date of Test: Hours Tested: PROOUCTioN FoR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: TEST PERIOD Flow Tubing Casing Press: Ca~cu~a,Teo OIL-BBL: GAS-MCF: WATER-BBL: Oll GRAVITY-API ~CORR~: Press. 24-HouR Rnre.~ Z7. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results p,er.24AA~.2~Q.071. ' (:{1P1~ l.EI-lON None ~ ~` JUL ~ ~' 20Q~ _°~p ~~~~ ~~=~~'~~~~~~~ ~!-1?_ ~ ~ 2007 .'t ?JP1 k ~lf~:3 ~ar~~.~. l~Q Q~ Form 10-407 Revised 02/2007 ~ R 1 G i N,~~°NTINUED ~N REVERSE .SIDE ~"1 f`,~ id~~A~/, 1'( ~ V ~ L! ZH. GEOLOGIC MARKERS ~LIST ALL FORMATIONS AN ERS ENCOUNTERED~: Z9. FORMATION TESTS NAME M ND Well Tested . ^ Yes ~ No Permafrost TOp If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Zone 1 B 10253' 8795' None Zone 1A / TDF 10409' 8831' Base Sadlerochit 12120' 8829' Formation at Total Depth (Name): Base Sadlerochit 12120' 8829' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. ~~ ` '~ Signed Terrie Hubble Title Technical Assistant Date ! /~ PBU 02-186 206-186 Prepared By Name/Number. Te~rie Hubble, 564-4628 Well Number Permit No. / A roval No. Driuing Engineer: Robert Caughlin, 564-4080 INSTRUCTIONS GeNewu: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Seroice Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production f~om each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITenn 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Irenn 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ~ ~ Legal Well Name: 02-18 Common Well Name: 02-18 Spud Date: 9/1/1980 Event Name: REENTER+COMPLETE Start: 5/22/2007 End: Contractor Name: NORDIC CALISTA Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 5/22/2007 12:00 - 00:00 12.00 RIGD N WAIT PRE Prep Rig for Move, Waiting on DS2-18 site prep, reroute charge pump, lines and electric motor in pump room, performing preventive maintenance on SLB injector and power pack unit, greasing and changing out gear oil, general housekeeping and painting through rig 5/23/2007 00:00 - 08:00 8.00 RIGD N WAIT PRE Prep Rig for Move, Waiting on DS2-18 site prep, performing 08:00 - 19:00 I 11.00 I MOB I P 19:00 - 19:30 0.50 MOB P 19:30 - 20:30 1.00 MOB P 20:30 - 22:00 1.50 BOPSU P 22:00 - 23:15 1.25 BOPSU P 23:15 - 00:00 0.75 BOPSU P 5/24/2007 00:00 - 03:00 3.00 BOPSU P 03:00 - 04:00 1.00 BOPSU N 04:00 - 05:30 1.50 BOPSU N 05:30 - 07:00 I 1.50 I BOPSUR P 07:00 - 08:30 1.50 BOPSU N 08:30 - 10:00 1.50 BOPSU N 10:00 - 10:15 0.25 BOPSU P 10:15 - 12:00 1.75 BOPSU P 12:00 - 13:45 1.75 BOPSU P 13:45 - 14:10 0.42 FISH P 14:10 - 15:45 1.58 FISH P preventive maintenance on SLB injector and power pack unit, greasing and changing out gear oil, general housekeeping and painting through rig, troubleshoot knocking noise on pump #1 when bring pump online, inspect bladder in pulsation damper for pump #1 PRE Move to DS2 well 18., spot in front of well, install cellar drip pan, check wellhead pressures, bled tbg down from 80 to Opsi, inspect welisite with DSO PRE SAFETY MEETING. Review procedure, hazards and mitigation to back rig over well. PRE Back over well and set down rig, spot trailers, general rig up, ACCEPT RIG at 20:30 hrs on 05/23/2007. ~ PRE N/U BOPE. Hardline crew RU tiger tank and hardline PRE Grease swab, SSV, master & choke manifold valves, Install test Jt, RU test recorder, Spot cuttings tank, Continued RU tiger tank and hardline, test line to tiger tank PRE Pressure test HCR, Kill and Choke valves from 250 to 3500psi. Test witness waived by AOGCC inspecter, Bob Nobel. PRE Pressure test choke manifold valves, surface lines and rams from 250 to 3500psi, Test witness waived by AOGCC inspector, Bob Nobel. RREP PRE Accumulator not holding pressure, KR regulator valve stem failed RREP PRE Removed stem assy, threads were worn and stripped, chased 5/8" x 11 threads on bonnet, replaced stem with non OEM 5/8" x 11 thread G-8 stud Nordic did not have spare part, will order in morning PRE Testing annular from 250 - 2500psi, pulled test jt, test blind rams from 250 - 3500psi, test Noor valves, lines and inner reel vaive from 250 - 3500 psi PRE Down time while awaiting on approval of repairs to the 3000 psi Gilmore KR valve. Install crash cage on injector. PRE Continue to iinstall crash cage on injector PRE PJSM for pulling BPV with lubricator. Anticipated pressure 500 - 800 psi. PRE PU lubricator. Install cap and open swab. No pressure under swab. remove treee cap. NU Iubricator.Pressure to kill line to 600 psi. witnessed BPV open. Pull back pressure. Pressure stablized at 580 psi under BPV. Close Swab. ND lubricator. LD BPV & lubricator. PRE PT inner reel valve. PT Pump #1 and pulsation dampener. DECOMP MU BHA GS spear. DECOMP RIH at min rate .5 bpm @ 600 psi holding 600 psi on choke. Shipping returns to tiger tank mostly gas. RIH at 7800 increase rate to2 bpm at 1340 psi holding 500 psi on choke seeing freeze protection crude and gas in returns. IA 150 psi OA 106 Printed: 6/71/2007 71:19:17 AM . ~ ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: 02-18 02-18 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Spud Date: 9/1 /1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 5/24/2007 14:10 - 15:45 15:45 - 16:00 16:00 - 17:00 1.58 FISH P 0.25 FISH P 1.001 FISH I P 17:00 - 17:20 0.33 FISH P 1720 - 19:00 1.67 FISH P 19:00 - 19:15 0.25 FISH P 19:15 - 21:00 1.75 FISH P 21:00 - 21:15 0.25 CLEAN P 21:15 - 21:55 0.67 CLEAN P 21:55 - 23:00 1.08 CLEAN P 23:00 - 00:00 1.00 CLEAN P 00:00 - 01:15 1.25 EVAL P 01:15 - 02:45 1.50 EVAL P 02:45 - 03:05 0.33 EVAL P 03:05 - 05:00 1.92 EVAL P 05:00 - 06:00 1.00 EVAL N WAIT 06:00 - 07:00 07:00 - 07:15 07:15 - 09:30 09:30 - 10:30 10:30 - 11:00 11:00 - 11:30 11:30 - 13:00 1.00 EVAL P 025 EVAL P 2.25 EVAL P 1.00 EVAL P 0.50 EVAL P 0.50 EVAL P 1.50 EVAL P DECOMP psi. Up Wt 31500#.@9400'. Continue to 9600'. DECOMP Shut monitor weli Shut in Pressure 420 psi. Attempt to bleed ot 200psi and shut in build back to 245. DECOMP Circulate 2.5 bpm 1300 psi circulate 140 bbp returns cleaning up DECOMP Flow check well, stable DECOMP Latch fish, POH to fish DECOMP Monitor well, Held PJSM on LD and Handling fish DECOMP POH, LD fish, recovered G seal, X-O, 12 jts of 2 7/8" FL4S liner and 8' cut joint with centralizers. total length of fish is 383', note pin ends on 2 7/8" FL4S liner were corroded on the bottom threads WEXIT PJSM on slickline operations, PU tools and handiing dummy whipstock W EXIT PU slick line tools to rig floor, RU sheave, pack off, hyd jars, stem, spang jar, 20' 3.70" dummy whipstock WEXIT RIH with 20' dummy whipstock on slick line to 10061' W EXIT POH, LD 20' dummy whipstock assy W EXIT Program caliper tool, PU tools to rig floor, PJSM on handling and running procedures of PDS caliper log, MU Caliper tool on slick line WEXIT RIH with caliperto 10061' W EXIT Log up from 10061' to 9500' W EXIT POH LD caliper and slickline tools, RD slickline, offload tools from rig floor, PDS is processing log WEXIT Waiting on SLB personnel, e-line unit was placed on will call 24 hr in advance through wells group coordinator, notified SLB e-line at midnight with a 4 hour notice prior to starting job, e-line coordinator called back at 02:OOhrs to say that his SLB crew was hour'd out, no other crew and unit was available. WEXIT SLB on location spot equipment W EXIT PJSM for Rig up and well control during the tubing punch operation. Well control risks: 3300 psi reservoir, potential for 5.4 bbl of trapped gas in annulus. Wili test packoff to 3000 psi SLB Max. W iil test with test rod rather than wire in packoff. After perf will allow gas to migrate before and control surtace with choke target range 1500 psi max surface. WEXIT RU E-line WEXIT RIH W EXIT Log Tie-in place guns on depth. Shoot guns.9966-9971' 21 ~ shots W EXIT Monitor well for 30 minutes. No Flow. WEXIT POH with tubing punch. Ali shots fired. 13:00 - 14:00 1.00 ZONISO P W EXIT LD spent tubing punch. PU Cement retainer and Model K setting tool. 14:00 - 15:00 1.00 ZONISO P WEXIT RIH with cement retainer 15:00 - 15:30 0.50 ZONISO P WEXIT Log tie - in. 15:30 - 16:00 0.50 ZONISO P WEXIT Set cement retainer at 10035. 16:00 - 17:30 1.50 ZONISO P WEXIT POH some gas back. Continue to circulate across the top keeping returns, RD E-line, Offload tools and equipment 17:30 - 18:45 1.25 ZONISO P W EXIT PU up Baker tools to rig floor, PJSM on running cement stinger 18:45 - 19:10 0.42 ZONISO P W EXIT Swap out temporary valve stem on koomey with OEM Gilmore Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5/25/2007 18:45 - 19:10 19:10 - 19:30 19:30 - 22:00 02-18 02-18 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 0.42 ZONISO P 0.33 ZONISO P 2.50 ZONlSO P Spud Date: 9/1/1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 W EXIT KR valve stem W EXIT MU baker cement stinger, MHA, CTC, Stab injector WEXIT R1H with cement stinger assy, hold 50psi back pressure, taking mostiy gas returns to tiger tank with little brine, Est circ rate at 9900' with 1, 2 and 3 bpm, 190psi, 560psi and 1117psi, UP wt 38k, Dn wt 20k, continued RIH, stung into cmt retainer at 10061', PU with 5k overpull, slack off w/ 6k down, est circ at 1, 2 and 3 bpm, 172psi, 542psi and 1176psi 22:00 - 22:30 I 0.501 ZONISO I P I I W EXIT 22:30 - 23:15 I OJ5I ZONISO I P I I W EXIT 23:15 - 23:30 I 0251 ZONISO I P I I W EXIT 23:30 - 00:00 0.50 ZONISO P W EXIT 5/26/2007 00:00 - 00:50 0.83 ZONISO P W EXIT 00:50 - 03:05 ~ 225 ~ ZONISO ~ P ~ ~ W EXIT 03:05 - 03:15 0.17 ZONISO P W EXIT 03:15 - 03:35 0.33 ZONISO P W EXIT 03:35 - 05:25 I 1.831 ZONISO I P I I W EXIT 05:25 - 05:35 0.17 ZONISO P WEXIT 05:35 - 07:30 1.92 ZONISO P WEXIT 07:30 - 08:15 0.75 ZONISO P WEXIT 08:15 - 09:30 1.25 ZONISO P WEXIT 09:30 - 09:45 0.25 ZONISO P W EXIT 09:45-11:15 1.50 ZONISO N WAIT WEXIT 11:15 - 12:00 0.75 ZONISO P WEXIT 12:00 - 12:15 0.25 ZONISO P WEXIT 12:15 - 13:15 1.00 ZONISO P WEXIT 13:15 - 14:05 0.83 STWHIP P WEXIT 14:05-14:45 0.67 STWHIP P WEXIT 14:45 - 16:15 1.50 STWHIP P WEXIT 16:15 - 17:00 0.75 STWHIP P WEXIT 17:00 - 19:00 2.00 STWHIP P WEXIT performed kick drill while tripping at 2600', shut in well on choke, WHP at 18psi Shut in well with 80psi, open choke, bled off to 22psi, shut in well, monitor for 15 minutes, pressure increased to 37psi Circ thru open choke at 2.61 bpm with 908psi, after 90 bbls pumped, started getting full returns, circ at 2.62/2.62bpm, 861 psi PJSM with ali involved hands, discussing cement job for zone isolation, while circ hole clean at 2.61/ 2.61bbls, 883psi, pumped total of 200bb1s Prime cement pumps, test lines Mix and pump 7bbls of 15.8ppg unislurry cement on the fly at 1.49/1.49 bpm, 500psi, switch to rig pumps, pumped 31 bbls of 2 ppb biozan KCL water at 2.58 bpm, 1350 - 1278psi, 28 bbis of 8.5ppg KCL water at 2.49bpm, 1225psi, unsting from cement retainer with 5k overpuli, POH to 9900', lay in 1 bbl of cement on top of cmt retainer, CIP at 0045 hrs, RIH washed to 10055' POH to cement BHA, pumping at 2.6bpm, 1000psi, cement in returns after pumping 95 bbls, strung out over the next 40bbls at 9.3 - 8.6ppg, Std bk inj POH w/ Cement BHA, LD Baker cmt stinger, pup jt and x-o's MU cmt milling assy with a 3.79" mill, mtr, LMHA, x-o,1 jt tbg, x-o, UMHA, CTC, Stab Inj, OAL 50.92' RIH with cmt milling assy,tagged at 10058', Up wt 38k, Dn wt 20k, 2.5/2.6bpm, 1245psi, PVT 335, IA 293psi, OA 171 psi Drill cement from 10058' to 10060', 2.42/2.41 bpm, 1447 psi POH to Cmt milling BHA LD cementing stinger PU swizzel stick and jet stack. LD swizzei stick and PU nozzel in prep for the N~ blowdown. Wait on N2. N2 truck had a hydraulic line failure on anotherjob and is being repaired. RU N2. Circulate coil with 60 fresh water and 10 bbl methanol. PJSM for N2 blow down. Confirm hard line to tiger tank is open. PT to 4000 psi. bieed off to 500 psi. Open up to coil . Purge with 1500 psi N2 for 12 minutes. Bleed off to tiger tank. Remove coil connector. Install grapple. Pull Coil tubing back to reel. Secure coil to reel. Cut off grapple. Remove hard line. Swap reels from 2 3/8" coil free to 2 3/8" e-coil Prep to pull Coil tubing across Pull e-coil tubing to rig floor, stab injector, RU coil cade wiring Printed: 6/11/2007 11:19:17 AM ~ 02-~$; . ~ ~~ a ~ ~ ! ~ ~ P ~~a x,~~`~i0~~ r) ~< i i p ~' ~ ~ ~ ', ~~~~,~ d~`' i`d ~~~~ ~ i ` ;~ ~~ ~ {)~ ~~ ~P ~~P~ ~~ ~~ r7~ ` ~~ ~~~ ~ _ ~ ~ ~ ~ ~ ,. . r ~ ~ ir~ f ~ ~ ~; ~ i ,i , ~ i ~ ~ ° ~P , i~ ~ ~y e~ y~ :.r,~~ ~p~ ~~~~ ~='~i ~ ~~~'~~ ~' ~ ~ ~~~~l~~ i~~'~" ~~~ ~ . , ~ r . , . a. ; d i ~~~k~~ ~fl t ~., <. . 1 1 iFi: i '~~ (~~ I i i„~ 11, Legal Welf Name: 02-18 Common Well Name: 02-18 Spud Date: 9/1/1980 Event Name: REENTER+COMPLETE Start : 5/22/2007 End: Contractor Name: NORDIC CALISTA Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 ~ [~t~"~~~ ~" ~Fr~m - To ~~ ~ E~~ d~s~rrt~t~~r~~~f C}~~ra#~c~n~ ' ' ~~~.~~.~~~~m. M~ur~ ~~~sk-''~~i+e~~. l~~'~' ~°~ ~~~ a~; ~ ~~~'" ~ ~'' ~~~~,~~~ t ~ ~; ~,~ y , ~ ~ , • i; ~ ~~ ., ~: '~~~ 5/26/2007 17:00 - 19:00 2.00 STWHIP P WEXIT and hardiine to reel, Stab Injector 19:00 - 20:00 1.00 STWHIP P WEXIT Circ CT volume, test inner reel valve 20:00 - 20:20 0.33 STWHIP P WEXIT Reverse Circ two CT volumes at 4bbts, 3300psi, for e-co+t slack management, no e-line movement 20:20 - 21:40 1.33 STWHIP P WEXIT PJSM on coil management, Break and PU injector, RU CT cutter, perform coil management, cut 15' of 2 3/8" CT, 16550' of eline CT left on reel, dress off CT, MU SLB dipple CTC, Pull test CTC to 40k SLB installed two RA tags, 8.6' from top of whipstock 21:40 - 22:55 125 STWHIP P WEXIT Megger E Line.OK (2000+ Meg Ohms, & 46 Ohms continuity test), M/U BHI Upper quick connect and prepare E-Line connection, Test electrical, OK. SAFETY MEETING. Review procedure, hazards and mitigation for M/U BTT whipstock and BHI Setting BHA. 22:55 - 00:00 1.08 STWHIP P WEXIT Test SLB CTC to 4000 psi, PJSM, Review procedure, hazards and mitigation for M/U BTT whipstock and BHI Setting BHA, Finish MU WS BHA, stab injector 5/27/2007 00:00 - 02:35 2.58 STWHIP P WEXIT RIH with Whipstock BHA on coil trak to 9700' 02:35 - 03:00 0.42 STWHIP P WEXIT Ran correlation strip from 9710 - 9785', correction of -19' 03:00 - 03:25 0.42 STWHIP P WEXIT RIH to 10010', set whipstock with 1200psi, TF at 175L, set dn with 5k on whipstock 1 03:25 - 03:45 0.33 STW P W EXIT Open EDC, Circ 2ppb Biozan w/ 2% KCL displacing CT, V developed leak on hardline in reel, connection was loose, rep~aced rubber gasket,tighten connection, test line ok approx 10 gals leaked into bombay doors of which 5gals leaked through the side of the bombay door containment on to the gravel pad below. 03:45 - 04:40 0.92 STWHIP P WEXIT Displaced CT with 2ppb Biozan milling fluid 04:40 - 06:40 2.00 STWHIP P WEXIT POH to BHA, displacing well to 2ppb Biozan milling fluid 06:40 - 07:10 0.50 STWHIP P WEXIT PJSM on LD and handling WS setting tools and Coil trak BHA, set back injector, POH, LD Coil Trak and W S setting tools 07:10 - 08:30 1.33 STWHIP P WEXIT MU Window Milling Assy w/ a 3.80" diamond mill, reamer, Mtr, Coil Trak tools, X-O and CTC 08:30 - 09:00 0.50 STWHIP P WEXIT Stab onto well and surface test MWD. 09:00 - 10:45 1.75 STWHIP P WEXIT RIH to 9800'. Close EDC 10:45 - 11:05 0.33 STWHIP P WEXIT Up Wt 38.7 K. Continue to RIH tag at 10032 and correct to 10010'. 11:05 - 11:30 0.42 STWHIP P WEXIT Mill 2.57/2.62 bpm , 2380 psi = FS, DWTP=4130 psi, DHAP=4457 psi. ECD 9.54 11:30 - 11:40 0.17 STWHIP N WEXIT Lost power to pump. Change outcontrol module board on SCR #1 11:40 - 12:30 0.83 STWHIP P WEXIT Mill 2.61/2.64 bpm ~ 2600psi, 2380 psi = FS, DWTP=4150 psi, DHAP=4657 psi. ECD 927, WOB iK, 12:30 - 12:35 0.08 STWHIP N WEXIT Lost power to pump #1 Swap to pump#2.Continue to investigate SCR#1 temperature issues. 12:35 - 19:30 6.92 STWHIP P WEXIT Mill 2.51/2.55 bpm ~ 2580psi, 2380 psi = FS, DWTP=4090 psi, DHAP=4687 psi. ECD 9.27, WOB 2-3K, 19:30 - 21:20 1.83 STWHIP P WEXIT Miil to 10015.5', 2.61/2.65 bpm ~ 2684psi, DWTP=4755 psi, DHAP=4095 psi. ECD 927, WOB 5- 6k, PVT 326bb1s, IA Printed: 6/11/2007 17:79:17 AM '~ ,~ Legal Well Name: 02-18 Common Well Name: 02-18 Spud Date: 9/1/1980 Event Name: REENTER+COMPLETE Start: 5/22/2007 End: Contractor Name: NORDIC CAL15TA Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 5/27/2007 19:30 - 2120 1.83 STW HIP P W EXIT 435psi, OA 757psi, Bled down IA to 78 psi, OA to 159 psi 21:20 - 22:00 0.67 STW HIP P W EXIT PU 5', Up wt 34k, S/O wt 20.5k, FS 2300 psi at 2.6bpm, Tagged up, taking wt at 10014.4', Milled back to 10015.5 w/ 6k dn, 2.60/2.64bpm, 2425psi, WOB 2.5k, DHAP 4138 psi, DWTP 4587 psi, IA 149psi, OA 242psi, PVT 324bb1s, No progrss made 22:00 - 23:35 1.58 STWHIP P WEXIT POH to BHA 23:35 - 00:00 0.42 STWHIP P WEXIT Brk out Injector, POH w/ Milling BHA, LD mill, reamer and mtr, Mill and reamer in gauge with minor wear. 5/28/2007 00:00 - 00:30 0.50 STWHIP P WEXIT PU new mill, reamer and motor, service break LQC, MU CTC, stab injector 00:30 - 02:30 2.00 STWHIP P WEXIT RIH with milling BHA #6 tagged up at 10015' 02:30 - 07:i5 4.75 STWHIP P WEX1T Mill to 10016', 2.58/2.62 bpm C~ 2487psi, FS at 2300psi, DWTP 4574 psi, DHAP 4095psi, ECD 9.20, WOB 2.3k, PVT 325bb1s, IA 150psi, OA 100psi 07:15 - 16:50 9.58 STWHIP P WEXIT Radiator on Gen #2 pin hole leak.reported 1/2 pt on ground Swap to Gen #1. Investigate leak pin hole leak in radiator. See IR 2276908 Continue with milling operation. Milling 2.6 pbm 2600 - 2800 psi , Free Spin 2300 psi, Milling with 2300 - 5600 WOB High WOB required to reduce the vibration on the MWD tool. MiII to 10019. Bottom of window, Mill rat hole to 10029'. ' 16:50 - 17:30 0.67 STWHIP P W EXIT Make three passes dressing window. Window clean. Dry tag and PU clean. 17:30 - 18:15 0.75 STWHIP N WEXIT Wait on arrival of mud. Mud inadvertantly had to much lub added at MI and was returned to adjust properties. 18:15 - 18:45 0.50 STWHIP N WEXIT Circulate Flo Pro to mi~l. 18:45 - 20:15 1.50 STWHIP P WEXIT POH to milling BHA #6, disp~acing well bore to Flo-Pro mud 20:15 - 21:30 125 STWHIP P WEXIT POH with BHA #6, LD mill, reamer and motor, both in gauge, offload Baker tools from rig floor 21:15 - 22:30 125 STWHIP N SFAL WEXIT PJSM with involved personnel, reviewed safety concerns, hazards, precautions and operational procedures, discussing LO/TO operations, defeated and LO/TO electrical panel, rig electrician changed out control module mother board for SCR #1 do to intermittent power loss 22:30 - 22:45 0.25 DRILL P PROD1 PJSM with all crews, reviewed handling, operational procedures and HSE policies 22:45 - 23:30 0.75 DRILL P PROD1 MU BHA # 7 with Baker 2 7/8" x-treme motor w/ 2.7 degree bend, a rebuilt Hughes 3.75 x 4.125 RW D2ST304 bi center bit and coil trak assy, stab inj, surface check tools 23:30 - 00:00 0.50 DRILL P PROD7 RIH w/ BHA # 7 5/29/2007 00:00 - 01:00 1.00 DRILL P PROD1 RIH with BHA #7 to 9740' Pump #1 went down while RIH with minimum pump rate of .22bpm, switched to pump #2, troubleshoot pump #1, no problems were found with pump #1, switched back to pump #1 ', 01:00 - 01:50 0.83 DRILL P PROD1 Tie-In log from 9740' - 9810', -18.5' correction 01:50 - 02:00 0.17 DRILL P PROD1 RIH to 10029', slide through window wiihout pumps at 10010' with TF at 176L 02:00 - 03:00 1.00 DRILL P PROD1 Directional Drill with TF at 185L, 2.63bpm, FS 2870psi, 2.59/2.52bpm, 2831 psi, AP 4317psi, BP 4742psi, ECD 9.70ppg, WOB 1.08k, PVT 317bb1s, ROP 29fph, IA 78psi, OA ' Opsi, both pumps are fluctuating erratically up and down going Printed: 6/11/2007 11:19:77 AM ~! ~i Legal Well Name: Common Well Name: Event Name: Contractor Name: '~, Rig Name: I 5/29/2007 I 02:00 - 03:00 03:00 - 04:30 02-18 02-18 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 1.001 DRILL I P 1.501 DRILL I N Start: 5/22/2007 Rig Release: 6/10/2007 Rig Number: N1 PROD1 DFAL IPRODI 04:30 - 06:00 1.50 DRILL N DFAL PROD1 06:00 - 09:00 3.00 DRILL N DFAL PROD1 09:00 - t 1:00 2.00 DAILL N DFAL PRODi 11:00 - 11:30 0.50 DRILL N DFAL PROD1 11:30 - 11:40 0.17 DRILL N DFAL PROD1 11:40 - 18:40 7.00 DRILL P PROD1 18:40 - 18:50 I 0.171 DRILL I P I I PROD1 18:50 - 21:50 I 3.001 DRILL I P I I PROD1 21:50 - 22:20 0.50 DRILL P PROD1 22:20 - 23:10 0.83 DRILL P PROD1 23:10 - 23:15 0.08 DRILL P PRODi 23:15 - 00:00 0.75 DRILL P PRODi 15/30/2007 I 00:00 - 01:25 I 1.421 DRILL I P I I PROD1 0125 - 01:45 0.33 DRILL P PROD1 01:45 - 01:55 0.17 DRILL P PROD1 01:55 - 02:20 0.42 DRILL P PROD1 02:20 - 03:25 1.08 DRILL P PROD1 03:25 - 05:30 I 2.081 DRILL I P I I PRODi Spud Date: 9/1/1980 End: from 2.60 to 2.9 to 2.2 bpm, causing pressure spikes making it difficult to maintain TF, switched to different SCR assignments and pump, having same reaction with fluctuating pump rates and pressures. POH above window while troubleshooting pumps and SCR's, pumping at minimal rate, electrician did not found anything wrong with SCR's or pumps, open EDC, pumped at drilling rate, not able to dup~icate pump rate and pressure fluctuations, Closed EDC, RIH to btm, Drilled from 10051' to 10062', experienced same pressure and rate fluctuations. POH to check out tools from below EDC LD Bha found rubber in bit. Change out mud motor and MWD. RIH to 9800'. Log tie -in . Correction -22'. Continue to RIH. Directional Drill with TF at 180 - 15L, 2.55bpm, FS 2750psi, 2.55/2.55bpm, 2950psi, AP 4345psi, BP 4949psi, ECD 9.70 - 9.90ppg, WOB 1.08k, PVT 302 -297bb1s, ROP 21fph, IA 131 -234psi, OA 45 - 270psi, Motor stalling out, sensitive to WOB, anything more than 1 K, motor stalls out, lithology 30 - 40 percent chert, ROP increased at 10150' to 60-80fph, litholoy less than 5 percent chert Changed out screen in suction manifold on pump #1, found small particles of scale debri, gel fish eyes and sand particles, approx 1/4 cup Wiper trip clean to window. RBIH to btm. PVT = 296bb1s; IAP = 264psi; OAP = 310psi; Freespin = 2.65bpm/2850psi; Up wt = 33k. Run-in wt = 16k. Drill to 10350' with 15-25L TF, 2.65/2.65bpm, 2850/3350psi, 3k DWOB, 9.71ppg ECD & 65fph ave ROP. Pump #1 still giving minor erratic flowrates. Wiper trip clean to window. RBIH to btm. Drill to 10412' with 90L TF, 2.65/2.65bpm, 2950/3350psi, 3k DWOB, 10.12ppg ECD & 65fph ave ROP. Land well @ +/-10407'. W ill continue drilling with 2.7de~ bend to achieve desired left turn before pulling for lateral BHA. Short 100' wiper. Drili to 10430' with 90L TF, 2.65/2.65bpm, 2950/3400psi, 2.5k DWOB, 10.15ppg ECD & 35fph ave ROP. Continue drilling turn to 10479' with 90L TF, 2.65/2.65bpm, 2950/3400psi, 2.5k DWOB, 10.15ppg ECD & 35fph ave ROP. W iper trip clean to window. Log down GR & tie-into RA Pip tag. Correct CTDS by -0.5' & BHI depth by -0.7'. RBIH clean to btm. Continue drilling turn to 10567' with 105L TF, 2.65/2.65bpm, 3050/3500psi, 2.5k DWOB, 10.21ppg ECD & 75fph ave ROP. POOH for lateral BHA. Pull BHA above window & swtich from pump#1 to pump#2 to enable troubleshooting of pump#1. Open up & inspect pump#1 components - observed mismatch of different manufacturers' valves/seats => 2 Nova-Tech valves were installed in SPM valve seats. Change out the 2 Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: 02-18 Common Well Name: 02-18 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 5/30/2007 103:25 - 05:30 I 2.081 DRILL I P 05:30 - 05:45 025 DRILL P 05:45 - 06:00 025 DRILL P 06:00 - 08:00 2.00 DRILL P 08:00 - 10:15 2.25 DRILL P 10:15 - 11:05 0.83 DRILL P 11:05 - 12:45 I 1•67I DRILL I P 12:45 - 13:45 I 1.00 I DRILL I P Spud Date: 9/1 /1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 13:45 - 14:00 ~ 0.25 ~ DRILL ~ N ~ DFAL ~ PROD1 14:00 - 18:00 I 4.001 DRILL I N 18:00 - 18:30 I 0.50I DRILL I P 18:30 - 20:00 I 1.501 DRILL I P 20:00 - 20:50 0.83 DRILL P 20:50 - 23:00 2.17 DRILL P 23:00 - 23:10 I 0.171 DRILL I P 23:10 - 00:00 I 0.831 DRILL I P 15/31/2007 100:00 - 00:25 I 0.421 DRILL I P 00:25 - 00:55 0.50 DRILL P 00:55 - 01:10 025 DRILL P 01:10 - 01:40 0.50 DRILL P 01:40 - 04:15 2.58 DRILL P PROD1 Nova-Tech valves to SPM valves. Will retry pump#1 when we go back drilling. PJSM & THA for BHA changeout. UD drilling BHA#8. Bit grade 3/2/I with one plugged nozzzle. Inspect Baker motor, found hair line crack in the wear ring above the adjustment ring, offload Baker equipment, PU new motor, MU BHA #9 w/ new Hughes 3.75 x 4.125 RWD2ST BC bit, 1.2 deg motor, CoilTrak w/ RES, Stab injector RIH w/ BHA #9 to 10038', PU wt 32.5k at 9880', Dn wt 18k Tie-in pass f/ 10038' to 10058', repeat pass from 10020' to 10094', correction of -26.4' PU to 10030', log dn from 10030' - 10089' at 450fph, RES curves unstable, PU to t0030', reset mwd tool, log dn from 10030 - 10567, deep and shallow curves reading high Drill to 10585' with 105 TF, 2.55/2.52bpm, 3000/3350psi, FS 3010psi at 2.62bpm, 3k DWOB, 9.99ppg ECD & 65fph ave ROP, PVT 282bb1s, IA 532psi, OA 516psi, RES tool not working PU off btm with short wiper trip, troubleshoot RES tool, consuit with Baker Anch office, unable to get RES tool reading properly, discussed with Geotogist, agree to continue drilling without RES tool Drill to 10682' with 107R TF, 2.68/2.70bpm, 3333/3285psi, FS 3010psi at 2.62bpm, 1 k DWOB, 10.09 - 1021 ppg ECD & 18 - 83 - 40fph ave ROP, AP 4649psi, BP 5176psi, PVT 281 - 270bb1s, IA 532 - 676psi, OA 516 - 706psi, Motor stalling out, sensitive to WOB, anything more than 1 K, motor stalls out Cap seal leaking on pump #2, switched to pump #1, changed out cap seal on pump #2 (o-ring) RES tool not working PROD1 Drill to 10700' with 90R TF, 2.55/2.55bpm, 3050/3400psi, 0.8k DWOB, 10.22ppg ECD & 45fph ave ROP. PVT = 270bb1s; IAP = 685psi; OAP = 715psi; Freespin = 2.55bpm/3050psi; Up wt = 30k. Run-in wt = 15k. PROD1 Drill to 10750' with 90R TF, 2.55/2.55bpm, 3050/3300psi, 0.7k DWOB, 10.23ppg ECD & 35fph ave ROP. PRODt Wiper trip clean to window. RBIH clean to btm. PROD1 Drill to 10835' with 60-105L TF, 2.55/2.55bpm, 3050/3300psi, 1 k DWOB, 10.23ppg ECD & 35fph ave ROP. Have crossed the prognosed fault #1 with no lost circ. PROD1 Short 100' wiper. Swap well to new 8.6ppg flopro mud with 12ppb K-G & 3% L-T. PROD1 Drill to 10580' with 120R TF, 2.55/2.55bpm, 3050/3300psi, 1.5k DWOB, 1027ppg ECD & 65fph ave ROP. PROD1 Drill to 10900' with 100R TF, 2.55/2.55bpm, 3050/3300psi, 2k DWOB, 10.27ppg ECD, 65tph ave ROP. PROD1 W iper trip clean to window. PROD1 Log down GR & tie-into RA Pip tag. Correct CTDS & BHI depth by -1.8'. PROD1 RBIH cfean to btm. PROD7 Drill to 11075' with 100R TF, 2.55/2.55bpm, 3050/3350psi, 1-2k ~ Printed: 6/11/2007 11:19:17 AM ~ ~ ,Legal Well Name: 'Common Well Name Event Name: Contractor Name: Rig Name: 02-18 02-18 Spud Date: 9/1/1980 REENTER+COMPLETE Start: 5/22/2007 End: NORDIC CALISTA Rig Release: 6/10/2007 NORDIC 1 Rig Number: N1 ',5/31/2007 01:40 - 04:15 2.58 DRILL P PROD1 DWOB, 9.98ppg ECD, 85fph ave ROP. ~ 04:15 - 05:00 0.75 DRILL P PROD1 W iper trip clean to window. RBIH clean to btm. 05:00 - 06:55 1.92 DRILL P PROD1 Drill to 11225' with 90- 103R TF, 2.62/2.70bpm, 3450/3400psi, FS 3200psi, 1-2k DWOB, 10.11ppg ECD, 48 - 100fph ave ROP, AP 4622psi, BP 5181 psi, PVT 308 bbls, IA 480psi, OA 499psi 06:55 - 08:00 1.08 DRILL P PROD1 Wiper trip clean to window, PU wt 34.4k, RBIH clean to btm, Dn wt 12k, no hole problems 08:00 - 09:40 1.67 DRILL P PROD1 Drill to 11375' with 88R - 145L TF, 2.62/2.70bpm, 3450- ~ 3578/3400 - 3560psi, FS 3075psi, 1-2k DWOB, 10.09 - 10.19ppg ECD, 96 -108fph ave ROP, AP 4600 - 4635psi, BP 5320 - 5491 psi, PVT 299 - 295 bbls, IA 543 - 645psi, OA 56S - 645psi 09:40 - 10:20 0.67 DRILL P PROD1 W iper trip above window to 9866', PU wt 32.3k, slight bobbles at 10900' and 10400' 10:20 - 10:30 0.17 DRILL P PROD1 RBIH to 10050', Tie-in pass to 10065', correction 0' 10:30 - 11:15 0.75 DRILL P PROD1 RBIH to btm, slight bobbles at 10410' and 10916' 11:15 - 12:50 1.58 DRILL P PROD1 Drill to 11507' with TF 145 - 115L, 2.60/2.70bpm, 3490/3470psi, FS 3040psi, 1-2k DWOB, 10.14ppg ECD, 106fph ave ROP, AP 4617psi, BP 5404psi, PVT 289bb1s, IA 641 - 735psi BD to 120psi, OA 668 - 725psi BD to 131 psi, Hole sticky on btm with a few overpulls of 57, 44, 46, 48k 12:50 - 14:05 125 DRILL P PROD1 W iper trip to window with 2.78bpm, 3278psi, slight bobbles at 10905' and 10405', RBIH to btm with 1.98bpm, 2432psi, set down at 10900', shut down pumps, PU/ SO, slide right pass, RIH with 2.15bpm, 2600psi 14:05 - 17:45 3.67 DRILL P PROD1 Drill to 11650' with TF 115 - 135L, 2.58/2.66bpm, - 3373/3329psi, FS 3075psi, 1-2.5k DWOB, 10.14 - 10.32ppg ECD, 100' - 60' - 70fph ave ROP, AP 4617 -4705psi, BP 5451 psi, PVT 289 - 271 bbls, IA 120 - 255psi, OA 131- 251 psi, Stacking wt having difficulty sliding, hole sticky when coming off bottom while drilling this interval, lithology sandy siltstone, overpulis of 10-15k 17:45 - 19:40 1.92 DRILL P PRODi Wiper trip to window. Observe 5k O/pull ~+/-10910'. RBIH to btm. PVT = 257bb1s; IAP = 275psi; OAP = 300psi; Freespin = 2.55bpm/3050psi; Up wt = 30k. Run-in wt = 14k. Geo wants to drill ~ 88degs incl from present 8775ftvdss to 8780ftvdss hunting for better sand zones. 19:40 - 22:00 2.33 DRILL P PROD1 Drill to 11735' with 90-130L TF, 2.55/2.55bpm, 3050/3350psi, - 2-3k DWOB, 10.35ppg ECD, 45fph ave ROP. Sticky on btm with heavy P/Us of +/-10k O/pulls. Swap well to new 8.6ppg flopro mud with 12ppb K-G & 4% L-T. 22;00 - 23:25 1.42 DRILL P PROD1 Drill to 11782' with 90-100R TF, 2.55/2.55bpm, 3000/3250psi, - 2k DWOB, 9.83ppg ECD, 65fph ave ROP. Still sticky on btm with heavy P/Us of +/-10k O/pulls. Suspect we may be in Kavik. Geo wants to drop another 5'tvdss to 8785ftvdss to determine a control point for any furture OHST. 2325 - 23:40 0.25 DRILL P PROD1 Drili to 11797' with 90-100R TF, 2.55/2.55bpm, 2900/3250psi, ' 2k DWOB, 9.83ppg ECD, 65fph ave ROP. 23:40 - 00:00 0.33 DRILL P PROD1 Wiper trip to window. Observe +/-10k O/pull @ btm. 6/1/2007 00:00 - 01:00 1.00 DRILL P PROD1 Continue wiper tripping to window. Observe +/-4k O/pull ~ 10895'. 01:00 - 01:20 0.33 DRILL P PROD1 Log down GR & tie-into RA Pip tag. Correct CTDS by -1.8' & Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: 02-18 Common Well Name: 02-18 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Spud Date: 9/1 /1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 6/1/2007 01:00 - 01:20 0.33 DRILL P PROD1 01:20 - 02:10 0.83 DRILL P PROD1 02;10 - 05:40 3.50 DRILL P PROD1 05:40 - 09:00 3.33 DRILL C PROD1 09:00 - 09:30 0.50 DRILL C PROD1 09:30 - 09:40 0.17 BOPSU P PROD1 09:40 - 10:45 1.08 DRILL C PROD1 10:45 - 12:35 1.83 DRILL C 12:35 - 13:00 0.42 DRILL C 13:00 - 13:55 0.92 DRILL C 13:55 - 14:05 0.17 STWHIP C 14:05 - 15:45 1.67 STWHIP C 15:45 - 16:15 0.50 STWHIP C 16:15 - 17:00 0.75 STWHIP C 17:00 - 18:55 1.92 STWHIP C 18:55 - 19:10 025 STWHIP C 19:10 - 19:45 0.58 STVNHIP C 19:45 - 20:40 0.92 S7WHIP C 20:40 - 20:55 0.25 STWHIP C 20:55 - 21:10 025 STWHIP C 21:10 - 21:20 21:20 - 21:30 21:30 - 22:30 22:30 - 23:30 23:30 - 00:00 0.17 STWHIP C 0.17 STWHIP C 1.00 STWHIP C 1.00 STWHIP C 0.50 STWHIP C 6/2/2007 I 00:00 - 00:30 00:30 - 02:45 0.501 STWHIPIC 2.251 STWHIPIC PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 BHI depth by -1'. , RBIH to btm. Observe +/-5k wt bobbie ~ 10900' shale. '! Drill to 11919' (+/-8787ftvdss) with 90R TF, 2.55/2.55bpm, ~ ' 2900/3200psi, 1-2k DWOB, 9.89ppg ECD, 45fph ave ROP. Geo decides to stop drilling & plan for OHST. , POOH to drilling BHA#9, std bk injector Blow dn BHA, POH, LD coil trak, motor and bit, Bit grade 2/2/I Function test BOPs PU GHWS to rig floor, MU GHWS on catwalk, test coil trak too~s, MU BHA # 10, OHWS with Coil TrAk assy, Stab injector RIH with BHA #10, OHWS with Coil Trak Assy to 9780' Tie-in pass from 9780' to 9826', correction of -30' , RIH with BHA #10, OHWS with Coil Trak Assy to 11087.5', Up - Wt at 9999', 34.3k, Dn wt 19.6k, taking 5k down wt at 10430', PU work thru one time, RIH past 10900', no problem Set OH Whipstock w/ HS TF, sheared off with 4000psi Top of OHWS at 11075', Btm of OHWS anchor at 11087.5' - ~ POH to BHA #10 whipstock setting tooi assy POH w/ BHA #10, LD Baker OHWS setting tool MU BHA #11 milling assy, PU 1.2 deg motor, 3.79" D331 miil, coil trak assy, SLB CTC, Stab Injector RIH w/ BHA #11, D331 mill and coil trak assy to 10060'. Log down GR C~3 150fph & tie-into RA Pip tag, Correct CTDS & BHI depth by -31'. RIH OHST milling BHA #11 to 11000'. Wt check => Up Wt = 31 k, Down Wt = 18k. Dry tag OHST whipstock with HS TF C~ 11075'. P/U & bring on pumps. Retag OHST whipstock with pumps C~ 11074' & stall ~ 11074.9'. Flag CT. P/U & establish freespin ~ 2.65bpm/3000psi. Ease into milling from 11074'. Stall again C~2 11074.9'. Ease-in again from 11074.8'. Mill to 11076' with HS-15R TF, 2.65/2.65bpm, 3000/3150psi, 0.1k DWOB, 9.96ppg ECD, ifph ave ROP. Mill to 11077' with HS-15R TF, 2.65/2.65bpm, 3000/3150psi, 0.2k DWOB, 9.96ppg ECD, 4fph ave ROP. Mill to 11078' with HS-15R TF, 2.65/2.65bpm, 3000/3150psi, 0.3k DWOB, 9.87ppg ECD, 4fph ave ROP. Mill to 11079' with HS-15R TF, 2.65/2.65bpm, 3000/3150psi, 0.4k DWOB, 9.86ppg ECD, 6fph ave ROP. Mill to 11080' with HS-15R TF, 2.65/2.65bpm, 3000/3150psi, 0.4k DWOB, 9.86ppg ECD, 6fph ave ROP. Mill to 11090' with HS-15R TF, 2.65/2.65bpm, 3000/3220psi, 0.5k DWOB, 9.97ppg ECD, 10fph ave ROP. I Mill to 11100' with HS-15R TF, 2.65/2.65bpm, 3000/3220psi, 0.7k DWOB, 9.97ppg ECD, 10fph ave ROP. ~I Mill to 11105' with HS-15R TF, 2.65/2.65bpm, 3000/3220psi, ' 1.5k DWOB, 9.97ppg ECD, 10fph ave ROP. Confirm OHST departure from NB incl survey of 91.5degs ~ 11086'. Backream hole from 11105' to 11070' with HS-75R TF, 2.65/2.65bpm, 3000/3220psi and 40fph. POOH OHST milling BHA #11. Printed: 6/11/2007 11:19:17 AM ~ ~ 'Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: I 6/2/2007 I 00:30 - 02:45 02:45 - 03:00 03:00 - 03:30 03:30 - 04:00 02-18 02-18 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 2251 STWHIPIC 0.25 STWHIP C 0.50 STWHIP C 0.50 DRI~L C Start: 5/22/2007 Rig Release: 6/10/2007 Rig Number: N1 PROD1 PROD1 PROD1 PROD1 04:00 - 05:45 1.75 DRILL C PROD1 05:45 - 06:00 025 DRILL C PROD1 06:00 - 06:45 0.75 DRILL C PROD1 06:45 - 10:40 3.92 DRILL C PROD1 10:40 - 12:15 1.58 DRILL C 12:15 - 13:00 0.75 DRILL C 13:00 - 16:45 3.75 DRILL C 16:45 - 18:15 1.50 DRILL C 18:15 - 18:35 0.33 DRILL C 18:35 - 21:15 2.67 DRILL C 21:15 - 00:00 2.75 DRILL C 6/3/2007 00:00 - 0120 1.33 DRILL C 0120 - 03:00 1.67 DRILL C 03:00 - 04:30 04:30 - 07:45 1.50I DRILL I C 3.25) DRILL IX PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 SFAL IPRODI Spud Date: 9/1/1980 End: Meanwhile review Spill Prevention Control and Countermeasure Plan with crew. PJSM & THA for UD OHST BHA#11 and M/U drilling BHA#12. UD OHST milling BHA#11. P/U lateral drilling BHA#12 with 1.2deg X-treme motor, BHI HOT, USMPR, DGS, DPS, SBS, BCPM package and new Hycalog 3-3/4" x 4-1/4" SRX3611 M-B3 bicenter bit #5. Scribe tools. Initialize BHI tools and M/U injector. RIH with drilling BHA#12 to 10060'. Log down GR at 150fph & tie-into RA Pip tag, -31' correction RIH with drilling BHA #12 to btm at 11105' Drill to 11255' with 6- 95R TF, 2.62/2.61 bpm, 3409/3365psi, FS 2955psi, 1- 3k DWOB, 10.17ppg ECD, 135 - 25fph ave ROP, AP 4685psi, BP 5286psi, PVT 240 - 330 bbis, IA 156 - 266psi, OA 100 - 200psi, Lithology siltstone, coal, shale Offload 90bbls of reconditioned Flo-Pro mud to pits Madd Pass from 11264' to 10028' at 715fph RBIH to bottom, no hole problems Drill to 11305' with 70R - HS TF, 2.50/2.47bpm, 3350/3325psi, 1-3k DWOB, 9.96ppg ECD, 14-25fph ave ROP, AP 4544psi, BP 5790psi, PVT 327bb1s, IA 330psi, OA 287psi, Lithology inter bedded sandstone and shalely siltstone, stacking wt, stalling out frequently do to formation Drill to 11314' with 135 - 168R TF, 2.55/2.57bpm, 3400/3378psi, 1-3k DWOB, 10.2ppg ECD, 15fph ave ROP, AP 4651 psi, BP 5145psi, PVT 324bb1s, IA 359psi, OA 320psi, Lithology still inter bedded sandstone and shalely siltstone, stacking wt, stalling out frequently do to formation 200' short wiper. RBIH to btm & stall @ btm. Work string & ease into drilling. Drill with frequent stalls to 11359' with LS-90R TF, 2.55/2.55bpm, 3200/3450psi, 1-2k DWOB, 10.29ppg ECD & 20fph ave ROP. PVT = 322bb1s; IAP = 395psi; OAP = 365psi; Freespin = 2.70bpm/3000psi; Up wt = 30k. S/O wt = 14k. Drill to 11416' with 75-90R TF, 2.55/2.55bpm, 3200/3450psi, 1-2k DWOB, 10.24ppg ECD & 25fph ave ROP. Drill to 11421' with 60R TF, 2.55/2.55bpm, 3200/3450psi, 1-2k DWOB, 10.54ppg ECD & 25fph ave ROP. Stall repeatedly ~ 11421'. Drill to 11424'. Meanwhile conduct a pin-hole/parted CT drili with crew. W iper trip to window. Drop pump rate to 1 bpm while pulling thru OHWS. Observe 10k O/pull ~ OHWS. RBIH to btm with slight wt bobble across the OHWS area. Drill to 11470' with 15-60R TF, 2.55/2.55bpm, 3200/3450psi, 1 k DWOB, 10.44ppg ECD & 45fph ave ROP. Observe pin hole in CT across the continuous mill weld line & spraying of ca. 2 gallons of mud in rig floor. Surprising that CT pin-holed 2 hours after drill?? S/D pump. Line up & fill wellbore via the annulus. POOH drilling BHA#12 carefuAy. Observe pin-hole develop into a gash while being spooled onto reel. Stuff plastic into CT gash & Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: 02-18 Common Well Name: 02-18 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Spud Date: 9/1 /1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 6/3/2007 104:30 - 07:45 ! 3.251 DRILL I X I SFAL I PROD1 07:45 - 08:30 I 0.751 DRILL I X I SFAL I PROD1 08:30 - 11:00 I 2.501 DRILL IX I WAIT I PROD1 11:00 - 12:30 I 1.501 DRILL I X I SFAL I PROD1 12:30 - 13:00 0.50 DRlLL X SFAL PROD1 13:00 - 13:30 0.50 DRILL X SFAL PROD1 13:30 - 15:30 2.00 DRILL X SFAL PROD1 15:30 - 18:00 2.50 DRILL X SFAL PROD1 18:00 - 19:00 1.00 DRILL X SFAL PROD1 19:00 - 19:15 025 DRILL X SFAL PROD1 19:15 - 21:45 2.50 DRILL X SFAL PROD1 21:45 - 22:00 I 0.25 I DRILL I X I SFAI. I PROD1 cover with oily waste bag. Continue spooling CT onto reel while collecting dripping mud into drip pans & bucket underneath the reel. Vac up contained mud from bombay sump & report unplanned release to x5700. PJSM on handling and LD BHA, POH w/ BHA #12, LD Bit, Mtr, coil trak assy, Bit Grade 1/1/I, capped end of eline, stab inj over well PJSM on reel blow dn, responsibilities, equipment and supplies utilization with all involved personnel while waiting on herculite RU berm in reel house on top of bombay door below CT reel, drape over top of reel with herculite, Lay out herculite under bombay door on grave~ pad PJSM on CT displacement with fresh water Displaced CT with 21 bbls of fresh water to hole, no returns in pits, all returns in reel house berm RU reverse line, reverse circ with 53bbls of fresh water, take flo-pro returns to berm in reel house after pumping 48 bbls had fresh water returns, CT is completely displaced with fresh water, switched over to rig air, blow dn CT to air from reel to hole, switched to reverse with rig air, attempt to blow dn CT to air, unable to move fresh water with rig air RU N2 trk, cool down, PJSM on N2 blow down job, Test lines, rev blow down 11470' of CT with N2, recovered from this blow dn approx 30bbls, Overall total recovery was approx 87bbls, bteed N2 off to tiger tank RD hard line and ecoil electrical connector in reel. PJSM & THA for stripping off & pulling back CT to the reel. P/U injector & cut off CTC. Slip connector into CT & pull test. Strip-off CT from injector & spool back CT stub to reel. Wash-down CT reel with pressure washer to clean-up all mud drips. Secure CT with crossbar and chains & prep reei for shipment. S/B injector. PJSM & THA with Veco crew on CT reel swap. Inspect bridge crane shackles & observe one imitation CROSBY shackle as per safety alert discussed during weekly safety meeting. Remove shackle out of service & repiace wrth genuine spare => Good catch by crew. 22:00 - 22:15 0.25 DRILL P PROD1 PJSM & THA for P/Testing BOPE. 22:15 - 00:00 1.75 BOPSU P PROD1 Perform bi-weekly BOPE pressure / function test. AOGCC test witness waived by Chuck Scheve. Test witnessed by BP WSL, John Egbejimba. Meanwhile release reel drive bushings. P/U eline CT reel with bridgre crane & lower onto Veco trailer. P/U replacement eline CT reel into reel house with bridge crane & align drive pins & bushing. R/U CT e-line pressure bulkhead. 6/4/2007 00:00 - 04:00 4.00 BOPSU P PROD7 Continue pressure testing BOPE. P/test floor valves. Continue R/U CT e-line pressure bu~khead. M/U hardline to reel. Slip grapple connector into CT and pull test. 04:00 - 04:15 025 DRILL X SFAL PROD1 PJSM and THA for stabbing CT into the injector. 04:15 - 05:00 0.75 DRILL X SFAL PROD1 P/U injector. Pull CT across pipeshed and stab CT thru Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: 02-18 Common Well Name: 02-18 Spud Date: 9/1/1980 Event Name: REENTER+COMPLETE Start: 5/22/2007 End: Contractor Name: NORDIC CALISTA Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 6/4/2007 04:15 - 05:00 0.75 DRILL X SFAL PROD1 injector. 05:00 - 06:30 1.50 DRILL X SFAL PROD1 Cut off CT. Boot end of e-line. Stab injector on well, reverse circ 92 bbls of 1%, 1 f OdegF KCL, fiAing CT, pressure test inner reei valve to 3500psi, 15' of eline cable hanging below CT 06:30 - 07:30 I 1.001 DRILL I X I SFAL I PROD1 07:30 - 08:35 I 1•08I DRILL I X ~ SFAL I PROD1 08:35 - 09:15 0.67 DRILL X SFAL PROD1 09:15 - 09:45 0.50 DRILL X WAIT PROD1 09:45 - 10:40 I 0.92I DRILL I X 10:40 - 12:30 1.83 DRILL X 12:30 - 13:00 0.50 DRILL X 13:00 - 13:50 0.83 DRILL X 13:50 - 15:30 I 1.671 DRILL ( C 15:30 - 16:20 0.83 DRILL C 1620 - 17;05 0.75 DRILL C 17:05 - 18:20 I 1.25I DRILL I C 18:20 - 18:35 I 0.251 DRILL I C 18:35 - 20:10 I 1.58I DRILL I C 20:10 - 22:30 I 2.33I DRILL I C 22:30 - 23:45 1.25 DRILL C 23:45 - 00:00 0.25 DRILL C 6/5/2007 100:00 - 02:35 I 2.581 DRILL I C SFAL IPRODI SFAL PROD1 SFAL PROD1 SFAL PROD1 PROD1 PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 CT length 15700', E-line cable 15977' PJSM on coil management, Break and PU injector, perform coil management, cut 25' of 2 3/8" Ecoil, 15675' of eline CT left on reel, dress off CT, MU SLB dipple C7C, Pull test CTC to 40k, drop stuffing box, change out packoff rubbers PJSM, MUBHA #13 w/ UQC, Megger E Line.OK (2000+ Meg Ohms, & 46 Ohms continuity test), M/U BHI Upper quick connect and prepare E-Line connection, Test electrical, OK, Pressure test, SLB CTC, Baker UQC and hardline to 3500psi Displace CT with 60bbls of Flo-Pro mud, taking KCL returns to cutting box, Unable to open Gray master valve, waiting on valve crew, valve stem vapor locked, opened with 37 turns PJSM on handling MUBHA, MU BHA #13 with 1.2deg X-treme motor, Hughes RW D2ST304 4.125x 3.75 BC bit, BHI HOT, USMPR, DGS, DPS, SBS, BCPM package, LQC Scribe tools. Initiaiize BHI tools and M/U injector RIH w/ Lateral Drlg Assy BHA #13 Ran correlation strip from 9710 - 9785', correction of -25' RIH to 11240', slide thru window at 10010' and OHWS at 11075' without pumps, started mud swap to new Flo-Pro at 10200', worked through tights hole at 11240' - 11270', 11380' - 11410', intermiittent tight hole to btm Drill to 11473' with TF at 168R, 2.63/2.63bpm, 3265/3215psi, FS 2787psi, 1-3k DWOB, 10.16ppg ECD, AP 4544psi, BP 5615psi, IA 120psi, OA 44psi, swapping to new Flo-Pro mud, stacking wt, stalling frequently W iper trip to below OHWS at 11075' Drill to 11495' with TF at 150L, 2.63/2.63bpm, 3036/2996psi, 1k DWOB, ROP 25fph, 9.93ppg ECD, AP 4576psi, BP 5117psi, IA 159psi, OA 70psi, stacking wt, stalling frequently Drill to 11509' with TF at 150L, 2.63/2.63bpm, 3256/3245psi, 1-2k DWOB, ROP 35-80fph, 9.93ppg ECD, AP 4516psi, BP 5117psi, IA 159psi, OA 70psi, stacking wt, stalling periodically Short 200' wiper. Observe motorwork Q 11400'. PVT = 306bb1s; IAP = 185psi; OAP = 95psi; Freespin = 2.63bpm/3000psi; Up wt = 39k. S/O wt = 15k. Drill 11603' with 90L TF, 2.55/2.55bpm, 3100/3350psi, 14k SWOB, 1-2k DWOB, 10.02ppg ECD & 30-100fph ave ROP. W iper trip to window. Observe +/-5k O/pull across 11400' shafe & 10k O/pull Q OHWS. Drop pump rate to lbpm & work BHA thru OHWS. RBIH to btm with slight wt bobbles across the OHWS area & 11400' to 11420'. Drill 11637' with 135-170L TF, 2.55/2.55bpm, 3050/3300psi, 6k SWOB, 1-2k DWOB, 10.02ppg ECD & 20-80fph ave ROP. Drill 11651' with 105R TF, 2.80/2.80bpm, 3250/3500psi, 6k SWOB, 1-2k DWOB, 10.16ppg ECD & 20-80fph ave ROP. Drili 11750' with 90-120L TF, 2.80/2.80bpm, 3250/3500psi, 6k Printed: 6/11/2007 11:19:17 AM ! ~ ~ , ~~ , . ~ ~ ~ ~~ ~~~ ~ ~~ , ~~ ~~= ~~ ~ ~~~~~ ~a ~~~ ~~~~«~~.~ ~ ~ ~ ~ ~ ~ ~~ ~, ~°~~ ~~~~ . a,.~~ .a ~~~~ ~ , ,~~r ~~~ ~;,,, ~~ ~~~ ~~ ~ ~ ~ ~{~~~~~~~~~ s~~~~~ ~~~ ~~ ~, ;, ~ s~. ~~ti~,~{, ,:. w~, ~ . ~ ~ a ~. ~ , ~ ~~~~_ ~, ~. ,~. t y ~ Legal Well Name: 02-18 Common Well Name: 02-18 Spud Date: 9/1/1980 Event Name: REENTER+COMPLETE Start: 5/22/2007 End: Contractor Name: NORDIC CALISTA Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 ~Gi~~ A . (~C~E{1~' ~~ ~~~RiV. ~G#~~ . ~~i'~f ~~~~ ~~~~ P ( fU :~ ~~r~L#~~4~~~ L~~~~~ri~~~~~~.T .~iiw~~ ~d~`,~k'4 fi~"~~ ~. .~~w,- ' '~ ~ . ~a:~'i i, ., a.~Y. ii,,: ~?:, c; '~ : ~ i~.! ~ 4k.,:~~.. 6/5/2007 00:00 - 02:35 2.58 DRILL C PROD1 SWOB, 1-2k DWOB, 10.16ppg ECD & 20-80fph ave ROP. 02:35 - 04:50 225 DRILL C PROD1 Wiper trip to window. Weli was relatively clean across shale & OHWS. RBIH clean thru OHWS. Set down ~ 11260' shale & observe slight wt bobbie across 11420'. 04:50 - 07:35 2.75 DRILL C PROD1 Drill 11887' with 80 -112R TF, 2.62/2.60bpm, 3250/3219psi, 6k - SWOB, 1-2k DWOB, 10.37ppg ECD & 60fph ave ROP, IA 471psi, OA 388psi, frequently stacking and stalling 07:35 - 09:00 1.42 DRILL C PROD1 Wiper trip above tbg tail to 9780', Up Wt off Btm 38k, over pulls of 2-4k with no motor work at 2-4k at 11500', 1 1 387-1 1385', overpulls of 6-10k at 11346 -11331', overpull of 20k with motor work at 11258' - 11248', work thru once, ok, overpull of 5k at OHWS, 11075', no other hole problems 09:00 - 09:15 0.25 DRILL C PROD1 Tie-in from 9780' to 9802', -3 correction 09:15 - 10:00 0.75 DRILL C PRODi RIH to Btm, slight bobbles of 3-5k down drag at 11400', 11505', 11522', hole relatively clean, Up wt on btm 40k, brk over from 46k, Dn wt 15.5k, FS 2.55bpm, 2985ps, PVT 273bb1s 10:00 - 10:05 0.08 DRILI C PROD1 Drill 11887' with 105R TF, 2.57/2.54bpm, 3387/3347psi, 1-2k - DWOB, 10.37ppg ECD, 70fph ave ROP, IA 420psi, OA 372psi 10:05 - 10:15 0.17 DRILL N SFAL PROD1 DD survey processing software problem, PU off btm, change out processing chip, reboot computer, troubleshooting, MW D will provide survey info 10:15 - 10:20 0.08 DRILL C PROD1 Drill 11894' with 109R TF, 2.57/2.54bpm, 3387/3347psi, 1-2k - DWOB, 10.33ppg ECD, 70fph ave ROP, IA 420psi, OA 372psi 1020 - 11:00 0.67 DRILL N SFAL PROD1 Computer problems, PU ofE btm, reboot DD and MWD computers, still troubleshooting same problem as above. MW D surveys not working properly. 11:00 - 13:00 2.00 DRILL N SFAL PROD1 Troubleshooting Computer problems, POH inside tbg tail, while troubleshooting computer problems 13:00 - 15:00 2.00 DRILL N DFAL PROD1 Computer problems now sorted out, but Gamma Ray sensor in DGS locked up. Problem appears to be a downhole problem with Gamma Ray tool. It is reading maximum, and is not reading correctly in previously logged sections of the hole. Try all surface magic, but can't get it to work. POOH to change out DGS. 15:00 - 15:15 025 DRILL N DFAL PROD1 PJSM. Hold task hazard accessment. Discuss operation plan forward, hazards of the job, and mitigations to the hazards. 15:15 - 17:00 1.75 DRILL N DFAL PROD1 Lay down BHA #13. Check bit and motor. Motor tight. Bit jets free of mud, water courses free of mud. Bit graded 3-2, with 2 chipped cutters, 1 on pilot, 1 on wing cutters. Break out DGS. Install new DGS. High side tool. Check Gamma Sensor. Make up BHA #14. Remove checks from UQC. Install R1 check valve sub. Pick up Andergauge Agitator tool. Pickup DS49 bit in place of bicenter. 17:00 - 18:45 1.75 DRILL N DFAL PRODi RIH with BHA #14, with DS 49 bit and Agitator tool. Stop at 500' and perform shallow hole test. MWD working properly. Good indication of vibration of Agitator tool at surface. Drop pumps to minimum rate, continue RIH. 18:45 - 19:15 0.50 DRILL N DFAL PROD1 Log GR tie-in at RA tag. -12' CTD. 19:15 - 20:15 1.00 DRILL N DFAL PROD1 RIH. RIH clean past OHWS. RIH and sat down in shale at 11,409'. RIH clean to bottom. 20:15 - 21:05 0.83 DRILL P PROD1 Drill Z1A lateral with agitator. 2.5 bpm, 3700-4100 psi, 3K Printed: 6/11/2007 11:79:17 AM second attempt. All other places, the hole was clean. 10:30 - 12:20 1.83 DRILL P PROD1 Tag bottom, resume drilling. Free spin 3800 psi at 2.5 bpm. DHWOB=3130 Ibs. BHP=6153 psi. ECD=10.5 ppg. PVT=240 bbls. Drilling at 2.45/2.46/4300 psi. INC=89.8, ROP=82 fph. 12:20 - 13:50 1.50 DRILL P PROD1 Early wiper trip to shoe. GR has jumped up to 200 api. We may have drilled into the Kavik. Never really saw any "clean" sand. Wiper to circulate a bottoms up to give Geo a formation sample to look at. 13:50 - 14:50 1.00 DRILL P PROD1 Got the call from town to call this TD. Continue wiper trip up to window. Minor overpull and motor work at 11480'. Some motor work at 11380', minor at 11250'. Clean at OH whipstock. Continue up to window clean. 14:50 - 15:05 0.25 DRILL P PROD1 Log tie in pass, make +3' correction. 15:05 - 16:15 1.17 DR{LL P PROD1 W iper trip back in hole. Bobble and motor work at 11250', nothing at 11380', Hard set down and motor work at 11,480'. Made it past 11480' after picking up. Smooth the rest of the way to TD. Tag final TD at 12,205'. ~ Printed: 6/11/2007 11:79:17 AM • ~ Legal Well Name: 02-18 Common Well Name: 02-18 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 6/7/2007 I0820 - 09:30 I 1.17I CASE I P 09:30 - 09:45 025 CASE P 09:45 - 11:20 1.58 CASE P 11:20 - 11:35 0.25 CASE P 11:35 - 15:00 f 3.42 ~ CASE ~ P 15:00 - 16:15 I 1.251 CASE I P 16:15 - 16:35 0.33 CEMT P 16:35 - 17:15 0.67 CEMT P 17:15 - 19:00 1.75 CEMT P 19:00 - 20:10 I 1.171 CEMT I P 20:10 - 22:30 I 2.331 CEMT I P 22:30 - 22:45 I 0251 CEMT I P 22:45 - 23:40 I 0.921 CEMT I P 23:40 - 00:00 I 0.331 CEMT I P 6/8/2007 100:00 - 01:30 I 1.501 CEMT I P Spud Date: 9/1 /1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 RUNPRD Pump N2 for 15 minutes. Started out at 2000 cfm, lowered to 1000 cfm half way thru job. Bled N2 to the tiger tank thru the choke as discussed above. RUNPRD PJSM Re: Puliing coil back and securing reel for changing out. RUNPRD Pull coil back and secure reel. RUNPRD PJSM for swapping reels. Review proceedure and discuss hazards. RUNPRD Swap E-coil for E-free coil. Install grapple and pull test. Pull coil over and stab into injector. Attach BTT CTC. Puli test to 36 klbs. Note - Current wind speed 43 mph gusting to 50 mph. We would be on WOW time if we did not have the bomb bay door. RUNPRD Fill coil with mud and pump dart. Dart landed exactly at 60.0 bbls. Calculated volume was 60.9 bbls. RUNPRD PJSM Re: Rigging up Baker CTLRT BHA. RUNPRD Rig up BHA #17, Baker CTLRT cementing BHA. RUNPRD RIH with CTLRT BHA to cement liner. Pumping minimum rate, and RIH at 95 fpm. RIH to 9900'. Up wt at 9900' = 36K. RUNPRD Insert 5/8" steel ball and circ 2.7 bpm, 2800 psi, for 30 bbls to place ball over guide arch. Set down on top of liner at 9978' CTD, not corrected. Pick up to 42K up wt, so CTLRT is connected. Stack down 10K on liner. Circ. bali on seat at 45 bbls. Shear release at 4500 psi. Pick up free from liner at 33K. Set 10K down wt again. RUNPRD Circ. well over to slick KCL water. 2 bpm with full returns. Call out SWS cementers. Increase circ rate to 2.4 bpm with fufl returns. Mix 2# Biozan pill in pill pit. , RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping liner cement job. RUNPRD Batch mix cement. Circ. KCL water at 3.0 bpm, 2500 psi with 2.8 bpm returns. Cement at weight at 2330 hrs. RUNPRD Pump 2 bbl water. Press test cement line to 4000 psi. Stage 29 bbl, 15.8 PPG, G Cement. 1.7 bpm, 1000-1700 psi. 1.6 bpm returns. Added 2 bbls to account for losses. RUNPRD Clean cement line with Biozan and air. Insert mini dart. Zero in and out totalizers. Displace dart with 2# Biozan water. 10 bbl displ, 2.5 bpm, 1200 psi, caught fluid at 9 bbls. 20 bbl displ, 2.7 bpm, 2300 psi, 30 bbl displ, 2.7 bpm, 2300 psi, Swap to KCL water at 28 bbl displ. 40 bbl displ, 2.7 bpm, 2700 psi, 2.5 bpm returns 44.8 bbi displ, cement at shoe. zero out totatizer, press increasing 50 bbl displ, 1.9 bpm, 3800 psi, 1.9 bpm returns, trying to pack off. 55 bbl displ, 2.3 bpm, 2500 psi, 2.1 bpm returns. slow pump to Printed: 6/t t/2007 11:19:17 AM • i Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: 6/8/2007 I 00:00 - 01:30 01:30 - 03:15 03:15 - 03:30 03:30 - 05:30 05:30 - 06:00 06:00 - 06:30 06:30 - 09:00 09:00 - 10:40 10:40- 1i:30 11:30 - 12:00 12:00 - 13:00 13:00 - 13:45 13:45 - 15:40 02-18 02-18 Spud Date: 9/1 /1980 REENTE R+COM PLET E Start : 5/22/2007 End: NORDIC CALIS TA Rig Release: 6/10/2007 NORDIC 1 Rig Number: N1 Mc~u~s T~~k Cr~c#e I~F~T Pk~~se , i ,i :. : l~~scri~~i~ ~f C~p~~;~~~' ~ '~i~ ~ ~~ ~. ~ ~ ~ ;~~ ., , ~ ~. o ~ ; . ; ;,, ~,. a ~ ~ ~. ~~~ a . . n 1.50 CEMT P RUNPRD 1 bpm at 57 bbl 59.5 bbl dart on LW P. sheared at 3500 psi 62 bbl dispi, 2.7 bpm, 3500 psi, 2.5 bpm returns 65 bbl displ, 2.6 bpm, 4000 psi, 2.4 bpm returns 70 bbl displ, 2.4 bpm 3800, full retums, slow pump to 1 bpm LW P landed at 73.3 bbls. Calc. vol = 73.3 bbis. Press up to 2180 psi. Hold press on LWP. Held 2180 psi solid. Bleed off press and check floats, OK. 27 bbl returns up backside from out totalizer. Lost 2 bbl cement to formation. Cement job went well. Formation tried to pack off early on, but cleaned up. 1.75 CEMT P RUNPRD Press up 500 psi, sting out. POH replacing CT voidage with Biozan and KCL water. 0.25 CEMT P RUNPRD Lay out BTT CTLRT BHA. 2.00 CEMT P RUNPRD Cut and slip 90' of drill line. 0.50 EVAL P LOWERI Pick up SWS memory logging tools and carrier onto rig floor. RIH with 2.30" mill, motor, XO and 2 jts of 1-1/4" CSH workstring. 0.50 EVAL P LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for M/U SWS memory CNUGR logging tools. 2.50 EVAL P LOW ER1 Run mill and motor, 1 stand of CSH, memory CNL logging tooi with radioactive source, MHA, 37 stands of CSH, SLB MHA, CTC. 1.67 EVAL P LOW ER1 Make up SLB MHA, stab coil and MU injector. RIH with coil pumping at minimum rate. 0.83 EVAL P LOW ER1 Cement is at 1050 psi compressive strength. Start to log down from 9700' MD at 30 fpm. Pumping at 1.48 bpm. 1 for 1 retums. PVT = 299 bbls. Watching for cement returns on micro motion. Clean so far Weight is a littie ratty. May be contaminated cement in tubing. Started seeing ratty weight at 9500'. Weight check at 9800' clean pickup. Continue logging down. Started getting contaminated cement retums back from bottoms up when BHA was at 9200'. 0.50 EVAL P LOW ER1 Tag hard cement at 9980' CTM. The liner top was 9942', but our current depths are uncorrected and we have had typically a -25 to -30' correction, so expect that hard cement was very close to top of liner.. Try to clean it up by milling thru it. Saw bottom of hard cement at 9992' CTM. Clean down from there. 1.00 EVAL P LOW ER1 Cement to 2000 psi compressive strength. Total time 10:50 hours. Continue logging down at 30 fpm. Watching out for CTC to tag top of cement origionally found in tubing ~ 9200'. Ratty from 12166' CTM. Not getting lots of motor work, and seeing very slow ratty RIH weight. Not sure that this is PBTD. May have a cement sheath that our big SLB MHA is tagging on. Check pickup weight. Very ratty pickup with overpull. Not going to log down any further. Don't want to knock junk down on top of us if that is what we are tagging on. 0.75 EVAL P LOWERI Circulate perf pill to bit. Going to yo-yo on bottom while pumping. Did not want to pump perf pill until sure we could get deep enough. 1.92 EVAL P LOWERi Pill in place, try to run back down to last tag of 12166' CTM, Printed: 6/11/2007 11:19:17 AM ~ ~ Legal Well Name: 02-18 Common W ell Name: 0 2-18 Spud Date: 9/1/1980 Event Nam e: REENTE R+COM PLET E Start : 5/22/2007 End: Contractor Name: NORDIC CALIST A Rig Release: 6/10/2007 Rig Name: NORDIC 1 Rig Number: N1 ~.. D~t~ , Frc~m Tc~ r , M~+~~s T~sl~ ° G~d e i~PT ~`F?h~s~~ ~~, „ - - D~°scr~p#i~r~ c~'F C)p€~c~~~~ins _~ ~, .~ , , , ;_ .in 6/8/2007 13:45 - 15:40 1.92 EVAL P LOWERI and can't get down past 12161'. Don't want to get in trouble. Begin log from here. Log up at 60 fpm laying in Flo-pro perf pill. Pickup weight was clean this time at 42 klbs. Flag pipe at 9700' bit depth, 7303' EOP. 15:40 - 15:55 025 EVAL P LOW ER1 PJSM Re: standing back injector and tripping CSH OOH. 15:55 - 17:25 1.50 EVAL P LOW ER1 Break out SLB MHA. Stand back injector. Drop 5/8" ball to open cire sub. Trip CSH OOH standing back in derrick. 17:25 - 17:45 0.33 EVAL P LOWERI PJSM Re: Pulling radioactive source and laying down SLB logging tools. 17:45 - 19:00 1.25 EVAL P LOW ER1 Rig down cleanouUlogging BHA. Good data. Mill went to 12,112', so did not tag PBTD. No gas in lateral indicated from CNL. 19:00 - 20:00 1.00 EVAL P LOW ERi M/U BTT CTC, Pull and press test CTC. M/U 3.80" diamond parabolic mill, motor, cire sub, hyd disc, XO, 1 jt 2-3/8" PH6, XO, Checks and CTC. OAL = 51.51'. 20:00 - 22:20 2.33 EVAL P LOWERI RIH with cement milling BHA #18. Correct to flag at 7303' EOP. Added 9' CTD. RIH. Did not see any motor work or wt loss while RIH. RIH at 30 FPM from 9700-9983', with no motor work or wt loss. No indication of cement on top of liner with 3.80" mill. Tagged / stalled at 9983' CTD. not corrected depth. 22:20 - 23:10 0.83 EVAL P LOW ER1 Pick up and ream down at 30 fph. 2.5 bpm, 1440 psi. Stalled at 9982.5'. Top of BTT Deployment sleeve is at 9936' from tied-in MCNL/GR log. Pick up again and ream down at 2.6 bpm, 1550 psi, 30 fph. Stalled again at 9982.5 We are not milling cement. Mill is at top of liner at 9936'. Lightly tag top of liner and correct depth to 9936', so it is a down depth Tag. Correct CTD to 9936', -46.5' CTD. Circ. high vis pill to bottom while reaming up/down from 9936-9600'. Chase high vis pill from 9936' to surface. 23:10 - 00:00 0.83 EVAL P LOWERI POH while circ at 2.5 bpm, 1500 psi. Flag coil at 9500' EOP. [9551.5' CTD]. Flag is an accurate flag to perforate off of. POH while circ at 2.5 bpm, 1500 psi. 6/9/2007 00:00 - 01:00 1.00 EVAL P LOWERI POH while circ at 2.5 bpm. 01:00 - 01:15 0.25 EVAL P LOW ER1 Lay out 3.8" milling BHA. 01:15 - 02:00 0.75 CEMT P RUNPRD Pressure test liner lap. Very good test. Charted test. Initial press = 2040 psi. Press after 30 min = 1985 psi. Lost 55 psi in 30 min. Only lost 15 psi in last 20 min of test. 02:00 - 04:15 225 PERFO P LOWERI Rig up to run SWS 2" perf guns. Load guns in pipeshed. Check gun layout. PBTD for well is 12,112', so we changed bottom gun from 20' to 10'. Bottom perf will be at 12,110'. Prep rig floor to run guns. 04:15 - 04:30 0.25 PERFO P LOW ERi SAFETY MEETING. Review procedure, hazards and Printed: 6/11/2007 17:19:17 AM • • Legal Well Name: 02-18 Common Well Name: 02-18 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 6/9/2007 ~ 04:15 - 04:30 I 0.25I PERFOBI P 04:30 - 06:00 I 1.50 ~ PERFOB~ P 06:00 - 06:15 0.25 PERFOB~ P 06:15 - 06:35 0.33 PERFOB~ P 06:35 - 08:30 1.92 08:30 - 09:40 1.17 09:40 - 11:40 I 2.00 11:40 - 13:00 I 1.33 13:00 - 15:30 I 2.50 15:30 - 16:30 I 1.00 16:30 - 16:50 I 0.33 16:50 - 17:10 I 0.331 PE 17:10 - 18:15 1.08 PE 18:15-18:30 0.25 PE P P P P P P P P P P 18:30 - 22:00 3.50 PERFO P 22:00 - 00:00 2.00 W HSUR P Spud Date: 9/1/1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 LOWERI mitigation for running SWS 2" perf guns. Safery joint is ready. LOWERI M/U SWS 2" perf guns and blanks as per perforating program. SWS guns, blanks and firing head = 1,486.82'. LOW ER1 SD operations for crew change. LOWERI PJSM on shooting perf guns. Discuss hazards of live guns, not dropping items down hole, being careful not to bang guns, etc. LOW ER1 Resume making up perf guns. 70 total. - LOW ER1 Make up 14 stands of 1-1/4" CS hydrii. Strap when picking up. Make up MHA. Stab injector. LOWERI RIH with perf guns on coil. Weight check up above liner was 35 klbs. RIH thru liner top. Saw slight set down at 9985' CTM. (Probably cement inside liner that was seen on cleanout run). Continue RIH smooth. Catch EOP flag at 9500', BHA length =2360.32'. Found f~ag at 11895.3' CTM. Set depth to 11860.3'. (Made -35' correction) Consistent with corrections when drilling. LOWERI Weight check at 12100', up at 40 klbs. RIH ciean. Tag at 10166'. PU Clean. Pull up hole to bali drop position. Pump 25 bbls of perf pill, drop 1/2" ball, chase with 25 bbis perf pill. Confirm launched. Pull up hole. Position ball 10' bleow perf depth. Circulate ball on seat. Fire gun on the fly. Fired guns on depth. Good indication of fire. LOWERI POH pumping down the firing head to keep the hole full. Stopped with guns above top of liner and flow checked well. No flow observed. 0 bbls to catch returns after no flow test. Well isn't taking fluid. Continue POH to surface. Tag up. Flow test well again. No flow observed. LOW ERi Break off injector. Lay down SLB MHA. Stand back 14 stands of 1-1/4" CS Hydril. Pull SLB perf guns. LOWERi PJSM with all rig hands, SLB perforating crew. Discuss safety with perf guns, trapped pressure, well control, spills. Discussed hazards, and mitigations to hazards. LOW ER1 Held kick while tripping drill. Picked up SLB crossover and safety joint. Made up same. Deployed, closed bag and TIW valve. Took 2 minutes, good responce. Held after action review with rig hands. LOWERI Pull SLB perf guns OOH. Guns fired. LOWERi SAFETY MEETING WITH NIGHT CREW. Review procedure, hazards and mitigation for laying out fired perf guns and blanks. LOWERI Lay out fired SWS 2" perf guns and blanks. All shots fired. PERFORATED INTERVALS: 10,650 - 10,880' 10,910 - 11,030' 11,050 - 11,150' 11,305 - 11,330' 11,420 - 11,480' 11,522 - 11,532' 11,760 - 12,110' TOTAL OF 895' OF PERFORATIONS POST M/U swizzle stick BHA. Printed: 6/11/2007 11:19:17 AM ~ ~ ',Legal Well Name: 02-18 'Common Well Name: 02-18 ', Event Name: REENTER+COMPLETE '~Contractor Name: NORDIC CALISTA I Rig Name: NORDIC 1 Spud Date: 9/1/1980 Start: 5/22/2007 End: Rig Release: 6/10/2007 Rig Number: N1 6/9/2007 22:00 - 00:00 2.00 W HSUR P POST Jet stack. RIH to 2250' and freeze protect tubing with MEOH to surface. ' UO BHA. '~ 6/10/2007 00:00 - 02:00 2.00 RIGD P POST Clean rig pits. ' 02:00 - 04:00 2.00 RIGD N WAIT POST Wait for BPV crew. They were working on rig 3ES. I 04:00 - 06:30 2.50 RIGD P POST Set BPV with lubricator. T bar has maximum length of 24'. ', Needed 27' to reach tubing hanger. ', R/U lubricator to set BPV. Set BPV. Rig down. , Close master valve. j Well is dead. 06:30 - 08:00 1.50 RIGD P POST N/D BOPE. N/U Tree cap and pressure test with 3500 psi. ', I Pits are clean and empty, tree cap is installed and PT'd. , Released rig at 08:00 hours, 06/10/2007. TOTAL TIME ON W ELL FROM RIG ACCEPT TO RELEASE ' WAS 17 DAYS 11-1/2 HOURS. Further telex entries will be carried on the DS 02-126 DIMS , Morning report. Printed: 6/11/2007 11:19:17 AM . . , ~ • • bP BP Alaska ~$ ~ Baker Hughes INTEQ Survey Report INTEQ Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: WeN Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006 Site: PB DS 02 TR-11-14 UNITED STATES : North Slope Site Positiou: Northing: 5948800.37 ft Latitude: 70 15 53.847 N From: Map Easting: 687638.44 ft Longitude: 148 28 58.060 W Position Uncertainly: 0.00 ft North Reference: True Gmund LeveL 0.00 ft Grid Convergence: 1.43 deg Well: 02-18 Slot Name: 18 02-18 Well Position: +N/-S 2305.27 ft Northing: 5951102.59 ft Latitude: 70 16 16.520 N +E/_W -87.89 ft Easting : 687493.13 ft Longitude: 148 29 0.619 W Position Uucertainty: 0.00 ft Wellpath: 02-18BP61 Drilled From: 02-18 Tie-on Depth: 10000.00 ft Current Datum: 44 : 18 5/30/1996 11:44 Height 64.00 ft Above System Datum: Mean Sea Level Magnetic Data: 9/18/2006 Declination: 24.32 deg ~eld Strength: 57657 nT Nisg Dip Angle: 80.93 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.00 0.00 0.00 351.81 Survey Program for Definitive Wellpath Date: 9/18/2006 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 100.00 10000.00 1: Sperry-Sun BOSS gyro mutti BOSS-GYRO Sperry-Sun BOSS gyro muitishot 1U010.00 11917.00 MWD (10010.00-11917.00) MWD MWD - Standard 'Company: BPAmoca Date: 6/11/2007 Time: 11:07:13 Page: 1 Field: Prudhve Bay Caord'suate(NE) Refe~`ence: We~: U2-18, True Norifi Site: PB DS 02 Vertical (TVD) Reference: '+44 : 18 5f30l199611:44 64.0 A'ell: 0218 Sectit-n (VS)Reference: WeN (O.OON,O.OOE,351.81Azi} Welipath: 92-18BPB1 Survey Calrafation MeihoB: fihinirnum Curvature Db: Oracie Annotation MD TVD R ft 100U0.00 8580.13 TIP 10010.00 8589.07 KOP 11917.00 8850.64 TD Survey: MWD Start Date: 5/31/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD - Standard Tied-to: From: Definitive Path Survey MD ft Iacl .deg A~m deg TVD ' ft Sys TVI) ft N/S ft ElVN ` ft Map1V ft` MapE ft VS ft DIS Tool deg/10~ft 10000.00 27.32 26.00 8580.13 8516.13 4046.85 304.87 5955155.54 687697.07 3962.13 0.00 MWD 10010.00 25.99 24.42 8589.07 8525.07 4050.91 306.78 5955159.64 687698.88 3965.87 15.07 MWD 10010.00 25.99 24,42 8589.07 8525.07 4050.91 306.78 5955159.64 687698.88 3965.87 0.00 MWD 10042.14 20.79 17.87 8618.56 8554.56 4062.76 311.45 5955171.61 687703.25 3976.94 18.07 MWD 1Q074.02 16.88 8.13 8648.73 8584.73 4072.74 313.84 5955181.64 687705.38 3986.47 15.70 MWD 10108.95 23.79 358.62 8681.48 8617.48 4084.82 314.39 5955193.73 687705.64 3998.35 21.87 MWD 10145.14 27.16 332.16 8714.25 8650.25 4099.47 310.34 5955208.27 687701.23 4013.43 32.52 MWD 10178.77 35.10 321.85 8743.03 8679.03 4113.89 300.76 5955222.45 687691.30 4029.07 28.36 MWD 10209.87 43.75 319.03 8767.04 8703.04 4129.07 288.16 5955237.31 687678.32 4045.89 28.40 MWD 10242.03 52.63 318.86 8788.45 8724.45 4147.13 272.43 5955254.97 687662.15 4066.01 27.61 MWD 10277.24 62.22 316.25 8807.39 8743.39 4168.97 252.41 5955276.31 687641.59 4090.48 27.94 MWD a0~- ( ~ ~ • . ~r„~ ~ ~ ; bP BP Alaska ~s ~ Baker Hughes INTEQ Survey Report iNTEQ Compaays BP Amoco Date: 6/11/2007 Timo: 1Tt07:13 ! Pagt: 2 Field: Ptudlto2 B1y Co-ordinate(NE) Refcreuce: WeN: 02-1$, True Nor#h 5ite: PB DS 02 Ve~l (TVD) Reterence: 44 : 78 5f30/1996 i1:44 64.0 Well: ' 02-18 Sectian {VS} Reference: WeN (U.OON,O.OpE,351.8'SAzi) Wellpath: 02-18BRB1 Survey Cakulation Method: Minimurn CUruature Db: Orade Survey MB InM Azim TVD Sys TVD NfS ~/W MapN MapE VS BL5 Tooi . ft' deg deg > ft ft ft ft ft; ft ft tlegtld(fft ' 10307.18 71.02 316.83 8819.26 8755.26 4188.90 233.53 5955295.76 687622.22 4112.90 29.45 MWD 10338.47 79.78 315.15 8827.14 8763.14 4210.65 212.50 5955316.98 687600.66 4137.42 28.47 MWD 10369.93 88.35 312.51 8830.39 8766.39 4232.30 189.95 5955338.05 687577.58 4162.06 28.49 MWD 10407.00 90.31 302.74 8830.83 8766.83 4254.90 160.63 5955359.91 687547.70 4188.60 26.88 MWD 10440.02 89.48 293.02 8830.89 8766.89 4270.32 131.48 5955374.60 687518.18 4208.02 29.54 MWD 10469.49 89.48 285.62 8831.15 8767.15 4280.06 103.69 5955383.65 687490.15 4221.62 25.11 MWD 10500.50 89.39 277.82 8831.46 8767.46 4286.36 73.35 5955389.19 687459.67 4232.18 25.15 MWD 10532.08 89.26 268.24 8831.83 8767.83 4288.02 41.85 5955390.07 687428.14 4238.31 30.34 MWD 10563.91 90.06 261.49 8832.02 8768.02 4285.18 10.17 5955386.43 687396.54 4240.01 21.35 MWD 10595.43 88.68 265.51 8832.37 8768.37 4281.61 -21.14 5955382.09 687365.34 4240.94 13.48 MWD 10626.79 88.00 272.20 8833.28 8769.28 4280.98 -52.46 5955380.68 687334.04 4244.78 21.43 MWD 10655.95 88.28 278.37 8834.23 8770.23 4283.67 -81.47 5955382.64 687304.98 4251.57 21.17 MWD 10684.54 88.53 283.81 8835.02 8771.02 4289.16 -109.50 5955387.43 687276.82 4261.00 19.04 MWD 10715.~6 88.19 290.08 8835.90 8771.90 4298.05 -138.67 5955395.59 687247.44 4273.96 20.57 MWD 10745.48 88.25 290.87 8836.84 8772.84 4308.68 -767.16 5955405.51 687218.70 4288.54 2.60 MWD 10775.36 89.57 288.10 8837.41 8773.41 4318.65 -195.32 5955414.77 687190.30 4302.42 10.27 MWD 10817.24 90.92 282.82 8837.23 8773.23 4329.81 -235.67 5955424.92 687149.69 4319.21 13.01 MWD 10848.48 88.50 286.35 8837.39 8773.39 4337.67 -265.89 5955432.03 687119.28 4331.30 13.70 MWD 10885.19 88.65 292.30 8838.30 8774.30 4349.81 -300.51 5955443.30 687084.37 4348.25 16.21 MWD 10928.37 89.91 299.62 8838.85 8774.85 4368.70 -339.30 5955461.22 687045.12 4372.47 17.20 MWD 10963.06 91.13 305.48 8838.53 8774.53 4387.35 -368.53 5955479.14 687015.44 4395.10 17.25 MWD 10993.94 91.01 311.20 8837.95 8773.95 4406.50 -392.73 5955497.67 686990.77 4417.50 18.52 MWD 11026.15 89.60 315.99 8837.78 8773.78 4428.70 -416.05 5955519.29 686966.90 4442.80 15.50 MWD 11056.05 90.49 321.37 8837.76 8773.76 4451.15 -435.79 5955541.23 686946.62 4467.83 18.24 MWD 11094.46 90.49 326.52 8837.43 8773.43 4482.19 -458.39 5955571.70 686923.26 4501.77 13.41 MWD 11125.93 90.37 332.24 8837.19 8773.19 4509.26 -474.41 5955598.36 686906.57 4530.85 18.18 MWD 11160.32 90.74 338.09 8836.86 8772.86 4540.45 -488.84 5955629.18 686891.36 4563.78 17.04 MWD 11190.72 91.69 343.15 8836.22 8772.22 4569.11 -498.93 5955657.58 686880.56 4593.59 16.93 MWD 11220.74 91.78 349.11 8835.31 8771.31 4598.23 -506.12 5955686.51 686872.65 4623.43 19.85 MWD 11251.68 91.78 353.72 8834.34 8770.34 4628.80 -510.73 5955716.96 686867.28 4654.35 14.89 MWD 11289.34 92.08 1.05 8833.07 8769.07 4666.38 -512.45 5955754.47 686864.62 4691.78 19.47 MWD 11320.92 91.32 358.58 8832.14 8768.14 4697.94 -512,55 5955786.02 686863.74 4723.04 8.18 MWD 11353.24 91.99 355.02 8831.20 8767.20 4730.19 -514,35 5955818.22 686861.13 4755.22 11.20 MWD 11385.19 90.34 351.44 8830.55 8766.55 4761.91 -518.12 5955849.83 686$56.58 4787.14 12.34 MWD 11416.49 87.70 347.95 8831.09 8767.09 4792.69 -523.71 5955880.46 686850.22 4818.41 13.98 MWD 17445.71 87.61 343.76 8832.28 8768.28 4820.99 -530.85 5955908.57 686842.38 4847.44 14.33 MWD 11476.42 87.00 341.03 8833.73 8769.73 4850.23 -540.12 5955937.57 686832.38 4877.70 9.10 MWD 11506.30 85.52 338.14 8835.68 8771.68 4878.17 -550.52 5955965.24 686821.29 4906.84 10.85 MWD 11536.68 86.16 335.67 8837.88 8773.88 4906.04 -562.41 5955992.80 686808.71 4936.12 8.38 MWD 11579.82 90.43 332.70 8839.17 6775.17 4944.84 -581,18 5956031.12 686788.98 4977.2U 12.05 MWD 11610.04 90.58 328.09 8838.90 8774.90 4971.11 -596.10 5956057.01 686773.41 5005.33 75.26 MWD 11640.19 89.05 325.44 8839.00 8775.00 4996.32 -612.63 5956081,80 686756.26 5032.64 10.15 MWD 11670.73 87.85 322.82 8839.82 8775.82 5021.06 -630.51 5956106.08 686737.77 5059.67 9.43 MWD 11700.27 87.26 319.31 8841.08 8777.08 5044.01 -649.06 5956128.57 686718.66 5085.03 12.04 MWD 11730.53 87.88 319.78 8842.37 8778.37 5067.02 -668.67 5956151.07 686698.48 5110.60 2.57 MWD 11765.81 87.81 325.24 8843.69 8779.69 5094.98 -690.12 5956178.49 686676.34 5141.33 15.47 MWD 11796.38 87.60 329.87 8844.92 8780.92 5120.75 -706.51 5956203.85 686659.32 5169.17 15.15 MWD 11827.76 86.90 334.67 8846.43 8782.43 5148.49 -721.09 5956231.21 686644.05 5198.70 15.44 MWD 11860.30 86.68 337.30 8848.25 8784.25 5178.16 -734.31 5956260.54 686630.10 5229.96 8.10 MWD 11917.00 88.50 344.00 8850.64 8786.64 5231.58 -753.06 5956313.47 686610.02 5285.50 12.23 MWD t' < ~ • • ~ bP BP Alaska ~~ Baker Hughes INTEQ Survey Report I.1~iTEQ Companyr BP Amoco Date: 6H 1/2007 Tirne: 11:08:35 Page: } Fkid: Pru~Jhoe Bay ; Co-ordin$te(NE} Reference: WeN: 02-1$, True hlorth Site: PB DS 02 Vertieal (TVD) Reterence: 44 : 1$ 5/30/199611:44 64.U :Well: 02-1$ SeMion (VS) Reference: We11(fl.00f~1,A.OpE,359.48Azi} Wellpath: 02-186 Survey C.~kalation Method: Minimum Curvaiure Db: Oracle Field: Prudhoe Bay North 51ope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 , Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2006 Site: PB DS 02 TR-11-14 UNITED STATES : North Slope , Site Position: Northing: 5948800.37 ft Latitude: 70 15 53.847 N i From: Map Easting: 687638.44 ft Longitude: 148 28 58.060 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.43 deg Well: 02-18 Slot Name: 18 02-18 Well Position: +N/-S 2305.27 ft Northing: 5957102.59 ft Latitude: 70 16 16.520 N ' +E/-W -87.89 ft Easting : 687493.13 ft Longitude: 148 29 0.619 W ~ Position Uncertainty: 0.00 ft Wellpath: 02-186 Drilled From: 02-186P61 Tie-on Depth: 11056.05 ft Current Datum: 44 : 18 5/30/1996 11:44 Height 64.00 ft Above System Datum: Mean Sea Level Magnetic D~ta: 6/1/2007 Declination: 24.01 deg , Field Strength: 57669 nT Mag Dip Angle: 80.95 deg Vertical Section: Depth From (1'VD) +N/-S +E/-W Direction ft ft ft deg 34.00 0.00 0.00 351.49 Survey Program for Definitive Wellpath Date: 6/11/2007 Validated: Yes Version: 3 Actual From To Snrvey Toolcode Tool Name ft ft 100.00 10000.00 1: Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 10010.00 11056.05 MWD (10010.00-11917.00) (5) MWD MWD - Standard 11075.00 12205.00 MWD (11075.00-12205.00) MWD MWD - Standard Annotation MD TVD ft <ft 11056.05 8837.76 TIP 11075.00 8837.60 KOP 12205.00 8834.02 TD Survey: MWD StartDate: 6/11/2007 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD - Standard Tied-to: From: Definitive Path ~~~-i~~ .. • • bp BP Alaska ~ ~ Baker Hughes INTEQ Survey Report I.NTEQ Company: BP Amoco Date: 6/11l2007 Timer 11:D8:35 ' Page: 2 Fiekl: Ptudhoe Bay Co-ordinate{NE) Reference: ' WeH: 02-18, True North 5ite: PB DS 02 Vertical ('1'VD) Reference: 44 ; 18 5I30t199611:44 $4A Well: 02-18 Seetiun (VS) Reference: W~p (O.UON,fl.Q0E,351.49Azi} Wellpattr: 42-18B Survey Cakulatioa Method: Minimum Curvature ' Db: Qrade Survey MD Incl A~rm TVD Sys 1'VD N/S E/W MapN MapE ' VS DI.S ' Tool ft' deg deg ft ft, ft ft 8' ft ft degh00ft 11056.05 90.49 321.37 8837.76 8773.76 4451.15 -435.79 5955541.23 686946.62 4466.61 0.00 MWD 11075.00 90.49 323.91 8837.60 8773.60 4466.21 -447.29 5955556.00 686934.75 4483.21 13.40 MWD 11108.74 93.69 326.79 8836.37 8772.37 4493.94 -466.45 5955583.25 686914.90 4513.47 12.76 MWD 11139.12 96.62 323.66 8833.64 8769.64 4518.79 -483.70 5955607.65 686897.03 4540.60 14.08 MWD 11168.46 93.97 323.26 8830.93 8766.93 4542.26 -501.10 5955630.68 686879.06 4566.39 9.13 MWD 11199.64 91.60 326.15 8829.41 8765.41 4567.67 -519.09 5955655.64 686860.45 4594.19 11.98 MWD 11231.20 94.43 331,42 8827.75 8763.75 4594.61 -535.41 5955682.16 686843.45 4623.25 18.93 MWD 11260.96 92.73 334.74 8825.89 8761.89 4621.09 -548.86 5955708.30 686829.36 4651.43 12.51 MWD 11290.10 92.39 336.34 8824.59 8760.59 4647,59 -560.91 5955734.48 686816.65 4679.41 5.61 MWD 11324.39 89.97 339.06 8823.89 8759.89 4679.30 -573.92 5955765.86 686802.86 4712.70 10.62 MWD 11354.19 87.42 340.03 8824.56 8760.56 4707.21 -584.33 5955793.50 686791.75 4741.85 9.15 MWD 11393.20 90.15 345.47 8825.39 8761.39 4744.44 -595.89 5955830.43 686779.27 4780.38 15.60 MWD 11425.55 90.89 347.09 8825.10 8761.10 4775.87 -603.56 5955861.65 686770.82 4812.59 5.51 MWD 11456.72 94.49 352.12 8823.64 8759.64 4806.48 -609.18 5955892.11 686764.44 4843.70 19.83 MWD 11486.94 90.80 350.76 8822.24 8758.24 4836.32 -613.67 5955921.83 686759.21 4873.88 13.01 MWD 11519.53 88.43 346.80 8822.46 8758.46 4868.28 -620.01 5955953.62 686752.07 4906.42 14.16 MWD 11551.05 91.20 341.88 8822.56 8758.56 4898.62 -628.51 5955983.74 686742.82 4937.69 17.91 MWD 11581.69 93.22 337.56 8821.38 8757.38 4927.33 -639.12 5956012.17 686731.50 4967.65 15.55 MWD 11615.48 90.71 335.44 8820.22 8756.22 4958.29 -652.59 5956042.79 686717.27 5000.27 9.72 MWD 11646.02 88.25 335.17 8820.50 8756.50 4986.04 -665.34 5956070.21 686703.82 5029.59 8.10 MWD 11680.85 87.72 334.16 8821.72 8757.72 5017.50 -680.24 5956101.28 686688.15 5062.91 3.27 MWD 11717.38 87.85 329.67 8823.14 8759.14 5049.69 -697.42 5956133.04 686670.17 5097.30 12.29 MWD 11749.41 88.19 324.59 8824.24 8760.24 5076.57 -714.79 5956159.47 686652.14 5126.45 15.89 MWD 11780.39 90.46 326.12 8824.61 8760.61 5102.05 -732.40 5956184.51 686633.90 5154.26 8.84 MWD 11810.57 90.46 331.42 8824.37 8760.37 5127.85 -748.04 5956209.91 686617.63 5182.09 17.56 MWD 11852.20 90.65 337.04 8823.96 8759.96 5165.32 -766.13 5956246.92 686598.61 5221.83 13.51 MWD 11885.35 90.40 346.49 8823.66 8759.66 5196.77 -776.49 5956278.09 686587.47 5254.46 28.52 MWD 11917.77 89.23 350.10 8823.76 8759.76 5228.51 -783.07 5956309.66 686580.10 5286.83 11.71 MWD 11946.66 87.85 355.12 8824.50 8760.50 5257.14 -786.78 5956338.19 686575.68 5315.69 18.02 MWD 11977.54 86.44 359.45 8826.04 8762.04 5287.94 -788.24 5956368.94 686573.45 5346.37 14.73 MWD 12008.71 87.15 2.17 8827.78 8763.78 5319.06 -787.80 5956400.05 686573.12 5377.07 9.01 MWD 12040.31 89.79 1.26 8828.62 8764.62 5350.63 -786.85 5956431.63 686573.27 5408.16 8.84 MWD 12082.83 90.15 356.09 8828.65 8764.65 5393.12 -787.84 5956474.09 686571.23 5450.33 12.19 MWD 12114.10 87.85 351.84 8829.19 8765.19 5424.20 -791.12 5956505.08 686567.17 5481.55 15.45 MWD 12143.77 86.78 348.33 8830.58 8766.58 5453.39 -796.23 5956534.13 686561.35 5511.18 12.36 MWD 12205.00 86.78 348.33 8834.02 8770.02 5513.26 -808.59 5956593.67 686547.49 5572.22 0.00 MWD TREE= GRAY WELLHEA D = GEN 2 ACTUATOR= AXELSON --------- KB. ELEV = -- - _ 64' BF. ELEV = KOP = 3050' Max Angle = 95 @ 10451' Datum MD = _------- Datum ND = NA ----- - - 8800' SS 13-3l8" CSG, 72#, t~80, ID = 12_347" ~--{ 2697~ ~Tubmg Punch ~ AAechanical Whipstock 10010 F1MD Cement Retainer 10035 ELMD 41/2" O71S XN NP, ID = 3.725" 10U56' 41/2" BAKER SHEAROUT SUB 10067' TBGPC, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ QQS$' ~MD TT Logqed 9/27/87 10052' Pe~FORATION SLMiMRY REF LOG: BPNL ON 06/03/96 ANGLEATTOPPERF: 88° ~ 10650' Note: Reter to Roduction DB tor historical perf data SQE SPF If~ITERVAL ~pn/Sqz DATF 2" 6 10650 - 10880 O 06/Of~ 2" 6 10910 - 11030 O O6/0~ ~ 2" 6 11050 - 11150 O O6/Oc~ 2" 6 11305 - t 133Q O O6/09 7' 6 11420 - 11480 O O6/09/0 7 2" 6 11522 - 11532 O O6/09/07 2" 6 117&0 - 121 10 O 06/09/07 • WINDOW 10125' - 10130' 9-5/8" CSG, 47#, L-80/S00-95, ID = 8.681" ~-1 10090~ ~ 2-7/8" LNR-CT, 6.5#, L-80, .OOSfi bpf, ID = 2.441" I 11310' I SAFETY NOTES: ••• HORIZONTAL W ELL - 70° ~ 10340' AND 90° ~ 10425'. 141/2" OTiS HRQ SSSV N~. ID = 3.813" I GAS LIFT MANDRELS ST MD ND ~/ TYPE VlV LATCH PORT DATE 1 9878 8472 27 HES RK i47l2" BAKER PBR ASSY ~ 9-S/8' X 41/2" BA KER SA B PKR Top of 3-1/2" Liner, TaC •t12~ X NIP. ID = 2.813.' x 2-7/8 X-over 3-3l16" x 2-7/8" crcted H 12205' ~ ~ 10065' Chem cut 10100' CIBP- failed to hold pressure 10360' BKR 2-7/8" CIBP (SET 4I18106) 1 OS00' FISH-C~P-PUSHED TO BOTTOM (M18/O6) FlSH IS FREE TO MOVE 11623' FISH - 14.1' 1-11H6" DIAMETER LNE ~ PERF GUN W/N0 FN UP PROFILE BROKE W/-14' OF SPRINGIMRE DATE REV BY CONMFSITS DATE REV BY CONMENTS 1980 ORIGINAL COMPLETION 06/22/06 COIWPJC SAFETY NOTE UPDATE D8/17/95 SIDETRACK O6/09/07 JGS CTD SIDEfRACK 02/09/03 ATDITP DELEfE WANER SAFETY NO 06/09l07 /PAG DRLG DRAFT CORRECTIONS 08/18/03 CMOfTLP DATUM MD CORRECTION OM16f06 JCNVPAG CIBP FISH OM19/06 SRB/PJC CIBP/PERF/FISH PUSNED BTM Pa~ H 11628' PRUDHOE BAY UNff UVE1L: 02-186 PERNKf No: 206-186 API No: 50-029-20454-02 SEC 36, T11 N, R14~ 4310.89' FE18 5210.56' FNL BP E~pbration (Alaska) 02-18B FROM CTDIDRLG - DRAFT ~ 8~ ~~ ~ CO1~TS~It~A7l`I011T COAi1~S~IO1~T Robert Caughlin CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 1.__.I S.4RAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE,ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-18B BP Exploration (Alaska) Inc. Permit No: 206-186 Surface Location: 95' FNL, 784' FWL, SEC. 36, T 11 N, R 14E, UM Bottomhole Location: 375' FSL, 179' FEL, SEC. 23, T 11 N, R 14E, UM Dear Mr. Caughlin: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission speci~cally authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness a y required test, contact the Commission's petroleum field inspector at (90~~-3607 (pager). DATED this7!~day of December, 2006 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. , ,,~ ~ ~ STATE OF ALASKA ~~~I V ~~ , '~ ~ ~' ALAS OIL AND GAS CONSERVATION COMM~O ~~~'~~'~~ ~~~`~ ~~~ PERMIT TO DRILL ~'~-~~`~ fl~~ 2 4 2006 ~' 20 AAC 25.005 Alaska ~~- R r.~r r...... ~__ 1 a. Type of work ^ Drill ~ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ~ Development Oil ^ Single Zone 1 c. Specify if well is pro d for:' ^ Coalbed Methane ~~~drates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. ~ 5. Bond: ~ Blanket ^ Single Well Bond No. 6194193 / 11. Well Name and Number: PBU 02-186 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12510 ND 8739ss 12. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 95' FNL 764' WL S C 36 T11 N R14E UM 7. Property Designation: ADL 028307 ~ Pool , F E . , , , , Top ofi Productive Horizon: 3849' FSL, 1021' FWL, SEC. 25, fi11N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date: February 15, 2007 Total Depth: 375' FSL, 179' FEL, SEC. 23, T11N, R14E, UM 9. Acres in Property: 2560 ~ 14. Distance to Nearest Property: 15,750' 4b. Location of Well (State Base Plane Coordinates): Surface: x-687493 y-5951103 Zone-ASP4 10. KB Elevation (Height above GL): 64 feet 15. Distance to Nearest Well Within Pooi: 970' 16. Deviated Wells: Kickoff Depth: 10015 feet Maximum Hole An le: 92 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 SurFace: 2420 1` '. i P `To _ .n D' h- n' f`m n f. r a' Hole Casin Wei ht Grade Cou lin Len th MD TVD MD ND includin sta e data 4_~~g~~ 33/16"xz-~~e~~ 6.2# /6.16# L-80 TCiI / STL 2538' 9972' 8491' 12510' 8739' 150 sx Class'G' 1$. PRESE NT 1I1tELt GONDITI4N S UMMARY (To be eompl~tetl for Redrill and Re-e nfry C}perations) . Total Depth MD (ft): 11628 Total Depth TVD (ft): 8810 Plugs (measured): 10360 Effective Depth MD (ft): 10360 Effective Depth ND (ft): 8832 Junk (measured): 11623 asing: Length; Size ementVoturne MD: TVD Conductor/Structural 0" 300 x P rmafrost II 80' SurFace 2697' 13-3/8" 2050 sx Fondu 400 sx PF II 2697' 2697' Intermediate 1 438' 9- /" 1650 sx'C' 300 sx PF'C' 10090' 8660' Pr i n Liner 1648' 2-7/8" 61 sx Class 'G' 9662' - 11310' 8280' - 8810' Perforation Depth MD (ft): 10314' - 11256' Perforation Depth TVD (ft): 8815' - 8812' 20. Attachments ~ Filing Fee, $100 ~ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Robert Caughiin, 56a-a080 Printed Name Robert Caughlin Title CT Drilling Engineer Prepared By Name/Number: Si nature L~~. ~r (~°~ ~°~"' i "~ Phone 564-4080 Date I 2 Q~ Terrie Hubble, 564-4628 Commisaion Use Onl Permit To Drill Number: 06- ~~6 API Number: 50-029-20454-02-00 Permit Approval See cover letter for D th r r ir m nts Conditions of Approval: rX If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Lu Samples Req'd: ~ Yes ~q No Mud Log Req'd: ^ Yes ~No ` HZS Measures: Yes ^ No ire ional Survey Req'd: ~Yes ^ No Other: 37~Q~'~~ ~3O~~~T~`~-Y'" APPROVED BY THE COMMISSION Date /~• .~ ,~ , COMMISSIONER Form 10-401 Revised 12/2005 Submit In DupliCate ,~-.,~' 6 `~ 1 lv.,~ ~ ~ ~ Bp ~ Prudhoe Bay 02-18B CTD Sidetrack CTD Sidetrack Summarv Pre-Rig Work: (scheduled to begin on January 15, 2007) 1. O Passed tubing caliper inspection 17-Jun-06 2. O Passed MIT-IA, -OA 21-Jun-06 3. O Passed PPPOT-IC, -T. Torqued LDS. 20-Ju1-06 4. E Set CIBP at 10,100' in 2 7/8" liner 5. E Chem cut 2 7/8" liner at 10,065'. Note top of cement @ 10,074'. 6. C Pull test liner to ensure section is free. 7. O Install BPV. 8. O PT MV, SV, WV 9. O Blind and bleed lines, remove well house, level pad Rig Work: (scheduled to begin on February 15, 2007) 1. MIRU, remove BPV, and test BOPE to 250 psi low and 3500 psi high. 2. Pu11403' of 2 7/8" liner 3. Clean-out to bottom of TT at 10052' 4. Punch tubing @ 9980'. 5. Set Cement retainer @ 10040'. 6. Pump annulus cement job, 6 bbls of 15.8 ppg cement. 7. Mill down to the cement retainer at 10040'. 8. Set Baker 4.5" monobore WS w LS(+/-30 degs) orientation @ 10,015' 9. Mi113.80" window with KOP at 10,015' and 10' of rathole. Swap the well to Flo-Pro. 10. Drill Build: 4.125" OH, 360' (30 deg/100 planned) to a depth of 103'75' MD. MAD pass build section with resistivity prior to drilling the lateral section. 1 l. Drill Lateral: 4.125" OH, 2135' (12 deg/100 planned) with resistivity to a depth of 12510' MD 12. MAD pass OH with resistivity tools 13. Run 3-3/16" x 2-7/8" solid liner leaving TOL at 9972' 14. Pump primary cement leaving TOC at 9972', 31 bbls of 15.8 ppg liner cmt planned 15. Cleanout liner and MCNL/GR/CCL log 16. Test liner lap to 2000 psi, running LTP if needed. 17. Perforate liner per asset instructions (~1000') 18. Freeze protect well, install BPV, and RDMO Post-Rig Work: 1. Remove BPV. 2. Re-install wellhouse and FL's. 3. Test separator (~1000' of prefs) Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCII 9972' md - 10450' md • 2-7/8", L-80 6.16# STL 10450'md - 12510'md • A minimum of 31 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9972' Existing casint/tubing Information 13-3/8", L-80 72#, BursT5380, collapse 2670 psi ~ 9 5/8", L-80 47#, Burst 6870, collapse 4750 psi 4-1/2", L-80, 12.6#, Burst 8430, collapse 7500 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 15,750 8. (North) • Distance to nearest well within pool - 970 ft. (02-17B) Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole MCNL/GR/CCL log will be run. Hazards • The maximum recorded H2S level on C Pad is 100 ppm. • Lost circulation risk is high. Reservoir Pressure • The max res. press. is estimated to be 3300 psi at 8800'ss (7.2 ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface is 2420 psi. VU~LF~AD = GBV 2 ACTUATOR = AXH.SON KB. ~EV = 64' BF. ~EV = KOP = 305Q' Ma~c Angle = 95 (~ 10451' Detum ND = NA DatumlVD= 8800'SS 13-3/S" CSG, 72#, f~480, ID = 12.347" H 2697' Minimum ID = 2.42" @ 9665' 3-1/2" X 2-7/8" XO oF 2-7~8" LNR - Cr H 9665' 02-18A SA~ETY I~TES: ••• HORIZONTAL W B.L - 70° ~ 10340' AND 90° ~ 10425'. 2207' Ha-u2~ oTls t#tGi sssv t~P, ID = s.a~3° GAS LIFf MANDR~S ST NND ND DEV TYPE VLV LATGi PORT ~IATE 1 9878 8472 27 FIES RK 9662' H41l2" G SEAL Su8 ~ ~~5' 3-1/2" X 2-7/8" XO,ID = 2.42" 9947' ~4-1l2"BAKERPBRASSY I 9962' 9-5/8" X 4-1/2" BAKER SAB PKR ~ I 4-1l2" TBG-PC, 12.6#, L-80, .0152 bpf, ID = 3.958" H 10068' 9-5/8" CSG, 47#, L-80lSOO-95, ID = 8.681" 10090~ TOP OF CE7uEA(T 1 090' PB2FORATION SUN~IAARY R~ LOG: BPNL ON ~/03/96 ANGLE AT TOP PB2F: 93 ~ 10520` Note: f~fer to R~oduction DB for historical perf data SQE SPF INTBZVAL Opn/Sqz QATE 2" 6 10314 - 10334 O 04/19/06 1-11/16" 4 10520 - 10540 C 01/27/98 1-11/16" 4 10540 - 10580 C 01/26/98 1-11/16" 4 10580 - 10600 C 01l23l98 1-11/16" 4 10600 - 10610 C 01/23/98 1-17/16" 4 10798 - 10970 C 08/15/95 1-11(16" 4 11038 - 11256 C 08J15/95 2-7/8" LNR-CT, 6.5~It, L-80, .0056 bpf, ID = 2.441" ~-{ 11310' 1 10056~ H 41 /2" OTIS XN N~, ID = 3.725" 10067' 4-1/2" Bi4K~t SFiEAROUT SuB 10068' 4-1/2" TUBNG TAIL 10052' ELAAD TT LOGGm 09l20/87 I M~LOUT WINDOW 10090' - 10413' I 10360' H BKR 2-7/8" CIBP (SET 4/18l06) QATE RLa/ BY COMMHJTS OATE REl/ BY COMuB~TS 1980 ORIGINAL COMPLETION 06/22/O6 COANPJC SAFEf`! NOTEUPOIATE 08/17I9S S~DETRACK 0?J09/03 A7DVTP D~EfE WAN92 SAFETY NO OS/18/03 CAAOlfLP OATUM WD CORRBCTION 04l16/O6 JpWPAG C~P F~H 04/19/08 SRB/PJC CIBP/P@2F/FISH PUSF~ BTM I(4I18/O6) FISH IS FREE TO AAOV E I 11623~ FISH- 14.1' 1-11/16" DIAMETH2LNE P92F GUN W/iV0 FN UP PRaFlLE ~ BROKE W/-14' OF SPRINGVIARE ~PBTD H 71628' ~ PRUDFIOE BAY INVIT VH~L: 02-18A P92~Mf No: `1950890 API No: 50-02~20454-01 SEC 36, T11 N, R14E, 4310.89' F~ 8 5210.56' FNL ~ Exploration (Alasks) VVH_LHEAD = GBV 2 ACTLIATOR = AX~SON KB. a.EV = fi4' BF. ~EV = KOP = 3050' Max Angle = 95 (d~ 10451' Datum ND = NA Datum ND = 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12.347" ~Tubing Punch ~ O~~~ H B SA NOTES: "* HORIZONTAL W ELL - 70° ~ Proposed CTD Sidetrack ~ osao' AND 90° (d~ 10425~. I 9980' I I4-1/2" OTIS XN NIP, ID = 3.725" H 10056~ Ceroent Reta!ner 10040' 4-1/2" BAKER SHEAROUT SUB 10067' 4-1/2" TBG-PC, 12.6#, L-80, .0152 bpf, ID = 3.958" 10068' ELMDTT Logged 9127187 10052' 0075' P6~FORATION SUNMARY f~ LOG: BPNL ON 06/03l96 A NGLE AT TOP P9~F: 93 @ 10520' Note: Refer to Production DB for historical perf data SIZE SPF IfYT~VAL Opn/Sqz 4ATE 2" 6 10314 - 10334 so ated proposed 1-11/16" 4 10520 - 10540 isolated proposed 1-11/16" 4 10540- 10580 isolated proposed 1-11/16" 4 10580 - 10600 isolated proposed 1-11/16" 4 10600- 10610 isolated proposed 1-11/16" 4 10798- 10970 isolated proposed 1-11/16" 4 11038- 11256 isolated proposed WINDOW 10125' - 10130' ~ 9-5/8" CSG, 47#, L-80/SOO-95, ID = 8.B81" 10090~ 2-7/8" LNR-CT, 6.5#, L-80, .0056 bpf, ID= 2.441" DATE REV BY COMMENfS DATE REV BY COMMIB~ffS 1980 OPoGINAL COMPLETION O6/22/O6 CONVPJC SAFEfY NOTEUPDATE 08N7/95 SIDETRACK 02/09l03 ATi7VTP D~EfE WAN6~ SAFEf`/ NO OS/18/03 CMO/TLP QATUM ND CORRE~TION 04/16/O6 JCIWPAG CIBP FISH 04/19/O6 SRBIPJC CIBP/PB~F/FISH PUSH~ BTM I(4/18/O6) FISH IS FR~ TO M1AOVE I 11623' FISH- 14.1' 1-11/16" DWMEfB2LNE P~2F GUN W/NO FN UP PROFILE ~ BROKE W/-14' OF SPRINGWIRE PRUDHOE BAY UN(f VN~L: 02-18A PB2Mff No:'1950890 AR No: 50-029-20454-01 S~ 36, T11 N, R14E, 4310.89' F~ & 5210.56' FNL BP Exploration (Alaska) 2207' H4-1/2" OTIS HRQ SSSV NIP, ID = 3.813" GAS LIFT MANDR~S ST MD ND DEV 1YPE VLV LATCH PORT DATE 1 9878 8472 27 HES RK ~ gg20' I ~Liner Top Packer I - 9947' 4-1/2" BAK9~ PBR ASSY 9962' 9-5/8" X 4-1/2" BAKER SAB PKR 9g72' Top of 3-1/2" Liner, TOC 9982' 3-1 /2" X NIP. ID = 2 813" 10450~ 3-3/16 x 2-7/8 X-over 3-3116" crrted X 2-7/8" pre-drilled 12510' 10065' Chem cut 10360' ~ BKR 2-7/8" CIBP (SET 4/18/O6) 10500' FISI+GBP-PUSH~ TO bp ~ BP Alaska ~ ~ Baker Hu hes INTE Plannin Re ort g Q g P B~ ~r ~s INTEQ Compaay: BP Amoco Dste: 12/5/2006 Time: 09:54:26 Psge: 1 Fietd: Prvdhoe Bay Co-ordinate(NE) Referenct: Well: 02-t8, True North' Sites PB D8 02 Vertical (TVD) Referenee: 44 : 18 5i30/199611:44 64.0 Well: d2-1$ Sectioo (VS}Reference: Well (O.OQN,O,p0E,345'.OOAxi} Weilpath: Pian 4, 02-188 Snrvey Calcalation Method: Minifttum Curv2turt Db: > OraCle' Fieid: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well CenVe Sys Datum: Mean Sea Level GeomagneNc Model: bggm2006 Site: PB DS 02 TR-11-14 UNITED STATES : North Slope Site PosiHon: ~iorthing: 5948800 .37 ft Latitude: 70 15 53.847 N From: Map Easting: 687638.44 ft Longitude: 148 28 58.060 W Position Uocertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.43 deg W ell: 02-18 Slot Name: 18 02-18 Well Position: +N/-S 2305.27 ft Nort6ing: 5951102.59 ft Latitude: 70 16 16.520 N +E/-W -87.89 ft Easting : 687493.13 ft Longitude: 148 29 0.619 W Position Uncertainty: 0.00 ft Wellpath: Plan 4, 02-18B Driited From: Q2-18 Tie-on Depth: 10000.00 ft Current Datum: 44 : 18 5/30/7996 11 :44 H eight 64.00 ft Above System Datum: Mean Sea Level Magnetic Data: 9/18/2006 Declination: 24.32 deg Field Strength: 57657 nT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (1'VD) +N/S +E/-W Direc tion ft ft ft deg 34.00 0.00 0.00 345.00 Plan: Plan #4 Date Composed: 9/18/2006 Copy Lamar's Plan 4, change to whipstock plan Version: 5 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <-- Lafitade -a': <.... Longitude ~ Name DescripNon TVD +N/-S ,+E!-W Northing Easting Deg Min Sec Deg Miq Sec Dip. Dir. ft' ft ft ft ft: 02-186 Polygon 64.00 4154.65 -429.79 5955245.00 686960.00 70 16 57.381 N 148 29 13.138 W -Polygon 1 64.00 4154.65 -429.79 5955245.00 686960.00 70 16 57.381 N 148 29 13.138 W -Polygon 2 64.00 5750.83 -1055.26 5956825.00 686295.00 70 17 13.078 N 148 29 31.363 W -Polygon 3 64.00 5814.46 -798.58 5956895.00 686550.00 70 17 13.704 N 148 29 23.885 W -Polygon 4 64.00 4176.61 -307.20 5955270.00 687082.00 70 16 57.596 N 148 29 9.567 W 02-186 Fault1 64.00 3559.46 -29.47 5954660.00 687375.00 70 16 51.527 N 148 29 1.477 W -Polygon 1 64.00 3559.46 -29.47 5954660.00 687375.00 70 16 51.527 N 148 29 1.477 W -Polygon 2 64.00 4229.65 -227.85 5955325.00 687160.00 70 16 58.118 N 148 29 7.256 W -Polygon 3 64.00 5036.05 -472.85 5956125.00 686895.00 70 17 6.049 N 148 29 14.394 W -Polygon 4 64.00 5837.46 -717.98 5956920.00 686630.00 70 17 13.931 N 148 29 21.537 W -Polygon 5 64.00 5036.05 -472.85 5956125.00 686895.00 70 17 6.049 N 148 29 14.394 W -Polygon 6 64.00 4229.65 -227.85 5955325.00 687160.00 70 16 58.118 N 148 29 7.256 W 02-18B FauR3 64.00 5990.64 -1044.29 5957065.00 686299.99 70 17 15.437 N 148 29 31.044 W -Polygon 1 64.00 5990.64 -1044.29 5957065.00 686299.99 70 17 15.437 N 148 29 31.044 W -Polygon 2 64.00 6582.98 -1129.56 5957655.00 686199.99 70 17 21.262 N 148 29 33.531 W 02-186 Fault2 64.00 3758.76 -399.64 5954850.00 687000.00 70 16 53.487 N 148 29 12.259 W -Polygon 1 64.00 3758.76 -399.64 5954850.00 687000.00 70 16 53.487 N 148 29 12.259 W -Polygon 2 64.00 4435.69 -667.88 5955520.00 686715.00 70 17 0.144 N 148 29 20.074 W -Polygon 3 64.00 4951.17 -880.12 5956030.00 686490.00 70 17 5.214 N 148 29 26.258 W -Polygon 4 64.00 5885.78 -1251.97 5956955.00 686095.00 70 17 14.405 N 148 29 37.095 W -Polygon 5 64.00 4951.17 -880.12 5956030.00 686490.00 70 17 5.214 N 148 29 26.258 W -Polygon 6 64.00 4435.69 -667.88 5955520.00 686715.00 70 17 0.144 N 148 29 20.074 W 02-18B Target4 8803.00 5752.99 -901.15 5956831.00 686448.99 70 17 13.100 N 148 29 26.873 W ~ bp ~ BP Alaska ~ ~ Baker Hu hes INTE Plannin Re ort g Q g P sa ~~r ~s iNTEQ Compaey: BP Amoca Date: 12/5/2006 T'-me: 09:54:26 ~'age: 2' ~eld: Prudhoe $ay Go-o+vlinate(NE} Referesce: We!!; 02-18, True NorNr Site: PB DS Q2 , Vertical (TVD) RePerence: 44 : 1 8 5130/1996 t L'44 64.tl WeII: OZ-~S SCChOH (VS~ RCftTCOCt: Well (O.OON,O.OOE,345.OOA2i) ;. Weilpat6: Plan 4, 02- 188 Survey Calcolatian Method: Minimum Curvafure Db: Oracle Targets Map Map ~- Latitude -> ~... Longitude =--~ : Name Description TVD +N/-S +E1-W PIort6iag Easting Aeg Min Sec I~eg Mie Sec Dip. Dir: ft ft ft ft ft 02-18B Target3 8818.00 5260.95 -746.35 5956343.00 6866t5.99 70 17 8.261 N 148 29 22.362 W 02-18B Target2 8829.00 4794.36 -568.91 5955881.00 686805.00 70 17 3.672 N 148 29 17. 191 W 02-18B Targetl 8835.00 4497.23 -528.30 5955585.00 686853.00 70 17 0.750 N 14 8 29 16. 008 W Annotation MD TVD ft ft 10000.00 8580.13 TIP 10015.00 8593.46 KOP 10029.00 8605.97 End of 9 Deg/100 DLS 10059.00 8633.85 4 10234.00 8784.39 5 10370.30 8831.10 End of 30 Deg/100 DLS 10510.30 8833.39 7 11310.30 8832.93 8 11635.30 8825.83 9 11910.30 8818.59 10 12210.30 8810.27 11 12510.30 8803.22 TD Plan Section Intormation MD Incl Azim TVD +N!-S +FJ-W DLS Build Turn TFO Targef ft deg deg ft ft ft deg/t00ft degl10 0ft deg/iDOft deg 10000.00 27.32 26.00 858Q.13 4046.85 304.87 0.00 0.00 0.00 0.00 10015.00 27.29 26.10 8593.46 4053.04 307.89 0.37 -0.20 0.67 123.23 10029.00 26.03 26.10 8605.97 4058.68 310.66 9.00 -9.00 0.00 1$0.00 10059.00 17.03 26.10 8633.85 4068.55 315.49 30.00 -30.00 0.00 180.00 10234.00 50.04 294.75 8784.39 4123.55 262.07 30.00 18.86 -52.20 255.00 10370.30 89.20 281.81 8831.10 4160.97 142.82 30.00 28.73 -9.49 340.00 10510.30 88.95 265.01 8833.39 4169.28 3.59 12.00 -0.18 -12.00 269.00 11310.30 91.10 0.99 8832.93 4653.28 -515.40 12.00 0.27 12.00 89.00 11635.30 91.30 321.99 8825.83 4955.48 -616.57 12.00 0.06 -12.00 270.70 11910.30 91.63 354.99 8818.59 5207.71 -715.98 12.00 0.12 12.00 89.00 12210.30 91.44 318.98 8810.27 5479.21 -831.30 12.00 -0.06 -12.00 270.20 12510.30 91.16 354.99 8803.22 5750.74 -946.63 12.00 -0.09 12.00 90.00 Survey MD Incl Azim SS TVD N/S FJW MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft degi100ft ft deg 10000.00 27.32 26.00 8516.13 4046.85 304.87 5955155.54 687697.07 0.00 3830.05 0.00 MWD 10015.00 27.29 26.10 8529.46 4053.04 307.89 5955161.79 687699.94 0.37 3835.24 123.23 MWD 10029.00 26.03 26.T0 8541.97 4058.68 310.66 5955167.50 687702.56 9.00 3839.98 180.00 MWD 10030.00 25.73 26.10 8542.87 4059.07 310.85 5955167.90 687702.74 30.00 3840.31 180.00 MWD 10040.00 22.73 26.10 8551.99 4062.75 312.65 5955171.63 687704.46 30.00 3843.40 180.00 MWD 10050.00 19.73 26.10 8561.31 4066.01 314.25 5955174.92 687705.97 30.00 3846.13 180.00 MWD 10059.00 17.03 26.10 8569.85 4068.55 315.49 5955177.50 687707.15 30.00 3848.26 180.00 MWD 10070.00 16.48 14.80 8580.38 4071.51 316.60 5955180.48 687708.19 30.00 3850.83 255.00 MWD 10080.00 16.53 4.22 8589.97 4074.30 317.07 5955183.28 687708.58 30.00 3853.41 265.83 MWD 10090.00 17.09 354.02 8599.55 4077.18 317.02 5955186.16 687708.46 30.00 3856.20 275.97 MWD 10100.00 18.13 344.70 8609.08 4080.14 316.46 5955189.11 687707.83 30.00 3859.21 285.74 MWD 10110.00 19.56 336.54 8618.55 4083.18 315.38 5955192.11 687706.67 30.00 3862.42 294.62 MWD 10120.00 21.32 329.55 8627.92 4086.28 313.79 5955195.18 687705.01 30.00 3865.83 302.35 MWD 10130.00 23.31 323.64 8637.17 4089.44 311.70 5955198.29 687702.84 30.00 3869.43 308.90 MWD 10140.00 25.49 318.65 8646.28 4092.65 309.10 5955201.43 687700.16 30.00 3873.20 314.37 MWD ~ bp ~ BP Alaska ~ ~ Baker Hu hes INTE Plannin Re ort g Q g P ~.r ~~s INTEQ Company: BP /1moc~ Date: 12i5l2006 ' Time: 09:54:3~ Page: 3 Field: Prudhoe Bay Gaardinate(NE) Refcreoce: Weik DZ-18, True North Site: PB D5 02' VerHcal ('I"VD} Refere~ce: ' 44 : 1 8 5l30/T99611:44 84.0 Wellc 02- 7$ Sectioe (VS} Refertnce: WeN (O.OON,O.f10E,345:OQAzi} Welipath: Pia n 4, 0?-18B Snrvey CstculaNoa Method: Miltimum Cuntature Db:' Orade Survey MD Incl Azim SSTVD N/S ~'JW MapN MapE <DLS VS TF(3 Tool'; it deg deg ft ft ft ft ft deg/100ft ft de9 10150.00 27.82 314.43 8655.21 4095.90 306.01 5955204.60 687696.99 30.00 3877.14 318.91 MUVD 10160.00 30.26 310.82 8663.96 4099.18 302.44 5955207.79 687693.34 30.00 3881.23 322.69 MWD 10170.00 32.78 307.71 8672.48 4102.49 298.39 5955210.99 687689.21 30.00 3885.47 325.84 MWD 10180.00 35.37 305.00 8680.76 4105.80 293.88 5955214.19 687684.61 30.00 3889.84 328.50 MWD 10190.00 38.01 302.62 8688.78 4109.12 288.91 5955217.39 687679.57 30.00 3894.33 330.74 MWD 10200.00 40.69 300.50 8696.52 4112.44 283.51 5955220.57 687674.08 30.00 3898.93 332.65 MWD 10210.00 43.41 298.61 8703.94 4115.74 277.68 5955223.72 687668.18 30.00 3903.63 334.29 MWD 10220.00 46.16 296.90 8711.04 4119.02 271.45 5955226.85 687661.86 30.00 3908.41 335.69 MWD 10230.00 48.93 295.34 8717.79 4122.26 264.82 5955229.92 687655.16 30.00 3913.26 336.91 MWD 10234.00 50.04 294.75 8720.39 4123.55 262.07 5955231.14 687652.37 30.00 3915.22 337.96 MWD 10240.00 51.74 293.97 8724.17 4125.47 257.83 5955232.96 687648.09 30.00 3918.17 340.00 MWD 10250.00 54.57 292.74 8730.17 4128.64 250.48 5955235.94 687640.66 30.00 3923.13 340.49 MWD 10260.00 57.42 291.59 8735.76 4131.77 242.80 5955238.88 687632.91 30.00 3928.14 341.23 MWD 10266.17 59.18 290.92 8739.00 4133.67 237.91 5955240.66 687627.98 30.00 3931.24 341.87 02-186 10270.00 60.27 290.52 8740.93 4134.84 234.82 5955241.75 687624.85 30.00 3933.17 342.22 MWD 10280.00 63.14 289.50 8745.67 4137.85 226.54 5955244.55 687616.51 3Q.00 3938.22 342.43 MWD 10290.00 66.01 288.54 8749.96 4140.79 218.01 5955247.28 687607.90 30.00 3943.28 342.91 MWD 10300.00 68.88 287.62 8753.80 4143.66 209.23 5955249.93 687599.05 30.00 3948.32 343.32 MWD 10300.56 69.05 287.57 8754.00 4143.82 208.73 5955250.07 687598.55 30.00 3948.60 343.68 02-18B 10310.00 71.77 286.73 8757.17 4146.44 200.23 5955252.48 687589.99 30.00 3953.33 343.70 MWD 10320.00 74.65 285.87 8760.05 4149.12 191.04 5955254.94 687580.74 30.00 3958.30 343.98 MWD 10330.00 77.54 285.04 8762.46 4151.71 181.69 5955257.29 687571.33 30.00 3963.22 344.22 MWD 10340.00 80.43 284.22 8764.37 4154.19 172.19 5955259.53 687561.77 30.00 3968.07 344.43 MWD 10350.00 83.32 283.42 8765.78 4156.55 162.58 5955261.65 687552.10 30.00 3972.84 344.58 MWD 10360.00 86.22 282.62 8766.69 4158.80 152.88 5955263.66 687542.35 30.00 3977.52 344.69 MWD 10370.30 89.20 281.81 8767.10 4960.97 142.82 5955265.58 687532.24 30.00 3982.23 344.77 MWD 10375.00 89.19 281.25 8767.17 4161.91 138.22 5955266.41 687527.62 12.00 3984.33 269.00 MWD 10400.00 89.14 278.25 8767.53 4166.15 113.58 5955270.02 687502.89 12.00 3994.79 269.01 MWD 10425.00 89.09 275.25 8767.92 4169.08 88.76 5955272.34 687478.00 12.00 4004.05 269.05 MWD 10450.00 89.04 272.25 8768.33 4170.72 63.82 5955273.35 687453.03 12.00 4012.08 269.10 MWD 10475.00 89.00 269.25 8768.75 4171.04 38.83 5955273.06 687428.04 12.00 4018.87 269.15 MWD 10500.00 88.96 266.25 8769.20 4170.06 13.86 5955271.45 687403.10 12.00 4024.38 269.20 MWD 10510.30 88.95 265.01 8769.39 416928 3.59 5955270.41 687392.85 12.00 4026.28 269.25 MWD 10525.00 88.98 266.78 8769.65 4168.22 -11.07 5955269.00 687378.23 12.00 4029.06 89.00 MWD 10550.00 89.03 269.78 8770.09 4167.47 -36.05 5955267.62 687353.27 12.00 4034.80 88.97 MWD 1Q575.00 89.09 272.78 8770.50 4168.03 -61.04 5955267.56 687328.28 12.00 4041.81 88.92 MWD 10600.00 89.15 275.78 8770.88 4169.89 -85.96 5955268.80 687303.32 12.00 4050.06 88.87 MiN~ 10625.00 89.21 278.78 8771.24 4173.06 -110.76 5955271.34 687278.45 12.00 4059.53 88.82 MWD 10650.00 89.28 281.77 8771.57 4177.52 -135.35 5955275.19 687253.76 12.00 4070.20 88.78 MWD 10675.00 89.35 284.77 8771.87 4183.26 -159.68 5955280.32 687229.30 12.00 4082.04 88.74 MWD 10700.00 89.41 287.77 8772.14 4190.28 -183.67 5955286.72 687205.14 12.00 4095.02 88.70 MWD 10725.00 89.48 290.77 8772.38 4198.51 -207.27 5955294.38 687181.35 12.00 4109.09 88.67 MWD 10750.00 89.56 293.77 8772.59 4207.98 -230.40 5955303.28 687157.99 12.00 4124.23 88.64 MWD 10775.00 89.63 296.77 8772.77 4218.66 -253.00 5955313.38 687135.12 12.00 4140.39 88.62 MWD 10800.00 89.70 299.77 8772.91 4230.49 -275.02 5955324.67 687112.82 12.00 4157.52 88.59 MWD 10825.00 89.78 302.77 8773.02 4243.47 -296.39 5955337.11 687091.14 12.00 4175.59 88.58 MWD 10850.00 89.85 305.77 8773.10 4257.55 -317.04 5955350.66 687070.14 12.00 4194.53 88.56 MWD 10875.00 89.93 308.77 8773.15 4272.68 -336.94 5955365.30 687049.88 12.00 4214.30 88.55 MWD 10900.00 90.01 311.77 8773.17 4288.84 -356.01 5955380.97 687030.41 12.00 4234.84 88.55 MWD 10925.00 90.08 314.77 8773.15 4305.97 -374.21 5955397.65 687011.79 12.00 4256.10 88.55 MWD 10950.00 90.16 317.76 8773.09 4324.03 -391.49 5955415.27 686994.06 12.00 4278.02 88.55 MWD 10975.00 90.23 320.76 8773.01 4342.97 -407.81 5955433.80 686977.28 12.00 4300.54 88.56 MWD 11000.00 90.31 323.76 8772.89 4362.74 -423.10 5955453.18 686961.50 12.00 4323.59 88.57 MWD ~ bp ~ BP Alaska ~ ~ Baker Hu hes INTE Plann~n Re ort g Q g P B~R ~ MLIGNE$ INTEQ Compaoy: BP Amoco Date: 12/5/2006 ' Time: 09:54:26 Puge: 4 Field: Prudhoe Bay Co-ordinate(NE) Referenee: Weli; 02-18, 7rue North Site: PB DS 02 V~rtical (TVD) Retereace: 44 : 1 8 5/30/T$8611:44 64.Q Well. 02-18 SecHoa (VS) Refereace: WeU (O.OON,O,OOE,345t00Azi) Wellpat6: Pla n 4, 02-186 Survey CalculaNoo Method: ' Minimum Curvature Db: Orade ` 5urvey MD ` Incl ' Azim SS;TVD N/S E/W MapN MapE DIS VS ' TF(3 Toot ft deg'= deg ft ft ft ft ft' deg/400ft ft deg 11025.00 90.38 326.76 8772.74 4383.28 -437.35 5955473.36 686946.75 12.00 4347.12 88.58 MWD 11050.00 90.45 329.76 8772.56 4404.54 -450.50 5955494.28 686933.07 12.00 4371.06 88.60 MWD 11075.00 90.53 332.76 8772.34 4426.46 -462.52 5955515.89 686920.51 12.00 4395.34 88.62 MWD 11100.00 90.60 335.76 8772.10 4448.98 -473.37 5955538.13 686909.10 12.00 4419.90 88.65 MWD 11125.00 90.66 338.76 8771.82 4472.03 -483.03 5955560.93 686898.87 12.00 4444.67 88.67 MWD 11150.00 90.73 341.76 8771.52 4495.55 -491.48 5955584.24 686889.84 12.00 4469.58 88.71 MWD 11175.00 90.80 344.76 8771.19 4519.49 -498.68 5955607.98 686882.05 12.00 4494.56 88.74 MWD 17200.00 90.86 347.76 8770.82 4543.77 -504.61 5955632.11 686875.51 12.00 4519.55 88.78 MWD 11225.00 90.92 350.76 8770.44 4568.33 -509.27 5955656.54 686870.24 12.00 4544.47 88.83 MWD 11250.00 90.98 353.76 8770.02 4593.09 -512.64 5955681.21 686866.26 12.00 4569.27 88.87 MWD 11275.00 91.03 356.76 8769.58 4618.00 -514.71 5955706.06 686863.57 12.00 4593.86 88.92 MWD 11300.00 91.08 359.76 8769.12 4642.98 -515.47 5955731.01 686862.19 12.00 4618.19 88.98 MWD 11310.30 91.10 0.99 8768.93 4653.28 -515.40 5955741.31 686862.00 12.00 4628.12 89.03 MVND 17325.00 91.13 359.23 8768.64 4667.97 -515.37 5955756.00 686861.66 12.00 4642.30 270.70 MWD 11350.00 91.16 356.23 8768.14 4692.95 -516.36 5955780.94 686860.05 12.00 4666.68 270.67 MWD 11375.00 91.19 353.23 8767.63 4717.83 -518.66 5955805.76 686857.14 12.00 4691.31 270.61 MWD 11400.00 91.22 350.23 8767.10 4742.56 -522.25 5955830.39 686852.93 12.00 4716.13 270.54 MWD 11425.00 91.24 347.23 8766.57 4767.07 -527.14 5955854.77 686847.43 12.00 4741.07 270.48 MWD 11450.00 91.26 344.23 8766.02 4791.29 -533.30 5955878.82 686840.67 12.00 4766.06 270.42 MWD 11475.00 97.28 341.23 8765.47 4815.16 -540.72 5955902.50 686832.66 12.00 4791.03 270.35 MWD 11500.00 91.29 338.23 8764.91 4838.60 -549.38 5955925.71 686823.42 12.00 4815.92 270.29 MWD 11525.00 91.30 335.22 8764.35 4861.56 -559.25 5955948.42 686812.98 12.00 4840.65 270.22 MVND 11550.00 91.31 332.22 8763.78 4883.97 -570.32 5955970.54 686801.36 12.00 4865.16 270.15 MWD 11575.00 91.31 329.22 8763.21 4905.76 -582.54 5955992.03 686788.60 12.00 4889.38 270.08 MWD 11600.00 91.37 326.22 8762.64 4926.89 -595.88 5956012.82 686774.73 12.00 4913.24 270.01 MWD 11625.00 91.30 323.22 8762.07 4947.29 -610.32 5956032.85 686759.80 12.00 4936.68 269.95 MWD 11635.30 91.30 321.99 8761.83 4955.48 -616.57 5956040.87 686753.34 12.00 4946.20 269.88 MWD 11650.00 91.33 323.75 8761.50 4967.19 -625.44 5956052.36 686744,18 12.00 4959.81 89.00 MWD 11675.00 91.38 326.75 8760.91 4987.72 -639.68 5956072.53 686729.43 12.00 4983.33 89.04 MWD 11700.00 91.42 329.75 8760.29 5008.97 -652.83 5956093.45 686715.76 12.00 5007.26 89.11 MWD 11725.00 91.46 332.75 8759.67 5030.88 -664.85 5956115.05 686703.20 l2.00 5031.54 89.18 MWD 11750.00 91.50 335.75 8759.02 5053.39 -675.71 5956137.28 686691.78 12.00 5056.09 89.26 MWD 11775.00 91.53 338.75 8758.36 5076.44 -685.37 5956160.07 686681.55 12.00 5080.85 89.34 MWD 11800.00 91.56 341.75 8757.68 5099.95 -693.81 5956183.37 686672.52 12.00 5105.75 89.42 MWD 11825.00 91.58 344.75 8757.00 5123.88 -701.01 5956207.11 686664.73 12.00 5130.73 89.50 MWD 11850.00 91.60 347.76 8756.30 5148.15 -706.95 5956231.23 686658.19 12.00 5155.71 89.58 MWD 11875.00 91.62 350.76 8755.60 5172.70 -711.61 5956255.65 686652.92 12.00 5180.63 89.66 MWD 11900.00 91.63 353.76 8754.89 5197.46 -714.98 5956280.32 686648.94 12.00 5205.41 89.75 MWD 11910.30 91.63 354.99 8754.59 5207.71 -715.98 5956290.54 686647.68 12.00 5215.57 89.83 MWD 11925.00 91.64 353.23 8754.17 5222.32 -717.49 5956305.11 686645.81 12.00 5230.08 270.20 MWD 11950.00 91.64 350.23 8753.46 5247.05 -721.09 5956329.74 686641.60 12.00 5254.89 270.15 MWD 11975.00 91.65 347.23 8752.74 5271.56 -725.97 5956354.11 686636.11 12.00 5279.83 270.06 MWD 12000.00 91.64 344.23 8752.02 5295.77 -732.13 5956378.16 686629.35 12.00 5304.81 269.98 MWD 12025.00 91.63 341.23 8751.31 5319.63 -739.55 5956401.83 686621.33 12.00 5329.78 269.89 MWD 12050.00 91.62 338.22 8750.60 5343.07 -748.21 5956425.04 686612.09 12.00 5354.66 269.81 MWD 12075.00 91.61 335.22 8749.89 5366.02 -758.08 5956447.74 686601.65 12.00 5379.39 269.72 MWD 12100.00 91.58 332.22 8749.20 5388.43 -769.15 5956469.86 686590.04 12.00 5403.89 269.64 MWD 12125.00 91.56 329.22 8748.51 5410.23 -781.37 5956491.35 686577.28 12.00 5428.11 269.55 MWD 12150.00 91.53 326.22 8747.84 5431.35 -794.71 5956512.13 686563.41 12.00 5451.97 269.47 MWD 12175.00 91.49 323.22 8747.18 5451.75 -809.14 5956532.16 686548.47 12.00 5475.41 269.39 MWD 12200.00 91.46 320.22 8746.53 5471.37 -824.62 5956551.39 686532.51 12.00 5498.36 269.31 MWD 12210.30 91.44 318.98 8746.27 5479.21 -831.30 5956559.06 686525.64 12.00 5507.66 269.23 MWD bp ~ BP Alaska ~ ~ Baker Hu hes INTE Plannin Re ort g Q g P sw~R r Nuc,~s INTEQ Compaey: BP Amo~ Date: 12/5l2006 Time: 09:5d:26 Page; 5 Field: PrudhoeBay Co-ordiaate(NE} Refertnce. WeIL 02-18, True Nordr' Site: PB DS 02 ` VerNeal (TVb) Referencr. 44 : 1 $ 5/3Q/193611:44'64.0 Welic 02-18 SecNon (VS} Reference: ' Well (O.OON,O.OOE,3d5:OQAzi) : Wellpath: Plan 4, 02'-18B Sarvey Cateui$tioe l~iet6od: ' Minimum Curvature Db: OraCle' Survey MD Incl Azim SS TVD N/S ` EJW MapN M~pE DIS VS ' 'fF0 Tool ft deg deg ft ft ' ft ft ft' deg/100ft ft deg 12225.00 91.44 320.75 8745.90 5490.44 -840.77 5956570.05 686515.90 12.00 5520.97 90.00 MWD 12250.00 91.43 323.75 8745.28 5510.20 -856.07 5956589.42 686500.11 12.00 5544.01 90.04 MWD 12275.00 97.43 326.75 8744.65 5530.73 -870.31 5956609.59 686485.36 12.00 5567.53 90.12 MWD 12300.00 91.41 329.75 8744.03 5551.98 -883.47 5956630.51 686471.68 12.00 5591.46 90.19 MWD 12325.00 91.40 332.75 8743.42 5573.89 -895.49 5956652.11 686459.12 12.00 5615.73 90.27 MWD 12350.00 91.38 335.75 8742.81 5596.40 -906.34 5956674.34 686447.71 12.00 5640.28 90.34 MWD 12375.00 91.35 338.75 8742.22 5619.44 -916.01 5956697.13 686437.47 12.00 5665.05 90.42 MWD 12400.00 91.33 341.75 8741.63 5642.96 -924.45 5956720.44 686428.45 12.00 5689.95 90.49 MV11D 12425.00 91.30 344.75 8741.06 5666.90 -931.65 5956744.18 686420.65 12.00 5714.93 90.56 MWD 12450.00 91.26 347.75 8740.50 5691.17 -937.59 5956768.30 686414.11 12.00 5739.91 90.63 MWD 12475.00 91.22 350.75 8739.96 5715.72 -942.25 5956792.72 686408.84 12.00 5764.84 90.69 MWD 72500.00 91.18 353.75 8739.43 5740.49 -945.62 5956817.39 686404.86 12.00 5789.63 90.76 MWD 12510.30 91.16 354.99 8739.22 5750.74 -946.63 5956827.61 686403.59 12.00 5799.79 90.82 3.5" Cs ~ • S ~ ~ ~ Q ~ ~ are L ~ ~ L.1.. bag BAG Dowell of bag Blind/Shears pipes 2 3/8" combi ram/slips ~ ~ Mud Cross I I Mud Cross iddle of flow cross of blind/shears variable bore pipe 3 1/2"-2 7/8" TOTs of pipe/slips 2 3/8" combi ram/slips Swab Valve Flow Tee ? ' Alaska Department of Natural Resources Land Administration System Page 1 of 7 ~ ~ ~ `° Aiaska Mapper Land RecardslStatus Piats Recorder's Search State Cabins ~~~ ~~~~~~~~ ~; F: ~ _ Alaska DNR Case Abstract File Type: ADL i, File Number: 28307 ^ Printable Case File Abstract See Township, Range, Section and Acreage? ~' Yes ~ No L..A...S.M.e.nu_ ~ Case Summarv ~ Case Detail ~ Land Abstract File: ADL 28307 ~_ `.~~~~~ ~: As of 12/26/2006 Customer: 000107377 BP EXPLORATION (ALASKA} INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISS/APPRV/ACTV AUTH Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: OS/28/1965 O~ce of Pr-imary Responsibility.• DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 014E Section: 13 Section Acres: 640 Search Plats Meridian: U Township: Ol 1N Range: 014E Section: 14 Section Acres: 640 Meridian: U Township: Ol 1N Range: 014E Section: 23 Section Acres: 640 Meridian: U Township: O11N Range: 014E Section: 24 Section Acres: 640 Case Actions OS-28-1965 TRACT DEFINED SALE DATE 07-14-1965 STATUS (11) 11 TRACT DEFINED BID TYPE 1 FIXED ROYALTY RATE SALE NUMBER 14 TRACT NUMBER 128 FORM NUMBER 5 DL-lOCTOBER 1963 CONDITIONAL Y/N N PRIMARY TERM 10 http://www.dnr.state.ak.us/las/Case Abstract.cfin?FileType=ADL&FileNumber=028307... 12/26/2006 `Alaska Department of Natural esources Land Administration System Page 2 of 7 ~ ~ 07-14-1965 NOTIFICATION LESSEE DESIGNATED NEW REL (20) 20 NOTIFICATION LESSEE OLD REL C~DE 21 DISPOSAL NAME NOTIFICATION CID NUMBER 169397 RICHFIELD OIL CORPOR OLD CID #(SALE NO) 4568 SALE 14 07-14-1965 INITIAL OWNER SEGMENT CODE 1 CID NUMBER 000169397 RICHFIELD OIL CORPOR WORKING INTEREST % 50 ROYALTY INTEREST % 43.750000 07-14-1965 INITIAL OWNER SEGMENT CODE 1 CID NUMBER 000106600 HUMBLE OIL & REFININ WORKING INTEREST % 50 ROYALTY INTEREST % 43.750000 07-14-1965 INITIAL OWNER SEGMENT CODE 1 CID NUMBER 000004568 SALE 14 ROYALTY INTEREST % 12.500000 07-14-1965 BID RECEIVED sTaTUS ~iz~ Iz B~ ~cE1vE~ BID TYPE 1 FIXED ROYALTY RATE TOTAL BONUS BID 160921.600000 DEPOSIT AMOL7NT 32185 ROYALTY SHARE °/a 12.500000 RICHFIELD OIL CORPORATION - 50% HUMBLE OIL & REFINING COMPANY- 50% 07-16-1965 LEASE AWARDED STATUS (13) 13 LEASE AWARDED 09-14-1965 LEASE ISSUED EFFECTIVE DATE 10-01-1965 EXPIRATN DATE 09-30-1975 STATUS (ZO) 20 ACTIVE 02-03-1966 CUSTOMER CHANGED NAME NEW NAME: ATLANTIC REFINING COMPANY OLD NAME: RICHFIELD OIL CORPORATION OS-20-1966 CUSTOMER CHANGED NAME http ://www. dnr. state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber=0283 07... 12/26/2006 ` Alaska Deparhnent of Natural Resources Land Administration System Page 3 of 7 ~ ~ NEW NAME: ATLANTIC RICHFIELD COMPANY OLD NAME: ATLANTIC REFINING COMPANY O l-17-1973 CUSTOMER CHANGED NAME NEW NAME: EXXON CORPORATION OLD NAME: HUMBLE OIL & REFINING COMPANY 04-08-1974 PATENT RECEIVED EFFECTIVE DATE 03-27-1974 EXPIRATN DATE 03-27-1984 LEASE TERM ADJUSTED. 04-0 l -1977 LTNITIZED EFFECTIVE DATE 04-01-1977 UNIT CODE PB PRUDHOE BAY TOTAL ACRES 2560 LJNIT ACRES 2560 LEASE COMMITTED IN ITS ENTIRETY TO PR UDHOE BAY AREA UNIT. DECISIONDOCUMENT NOT INFILE. 01-23-1981 ASSIGNMENT APPROVED EFFECTIVE DATE O1-23-1981 SEGMENT CODE 1 ASSIGNOR'S CID 000169397 ATLANTIC RICHFIELD C ASSIGNEE'S CID 000106346 ARCO ALASKA INC WORKING INTER % ASSIGNED 50 ROYALTY INTER % ASSIGNED 43.750000 01-23-1981 NOTIFICATION LESSEE CHANGED NEW NL (20) 20 NOTIFICATION LESSEE OLD NL (20) 20 NOTIFICATION LESSEE NEW NOTIF LESSEE CID# 106346 ARCO ALASKA INC OLD NOTIF LESSEE CID# 169397 ATLANTIC RICHFIELD C 07-06-1987 PARTICIPATING AREA ESTABLISHED EFFECTIVE DATE 12-01-1986 UNIT CODE PB PRUDHOE BAY TOTAL ACRES 2560 UNITIZED ACRES 2560 PARTICIPATING ACRES 2560 FORMATION OF THE INITIAL LISB URNE PARTICIPATING AREA. 09-12-1990 COMMENTS ARCO ROYALTY SETTLEMENT FILE IN AABA http://www.dnr. state. ak.us/las/Case_Abstract.cfin?FileType=ADL&FileNumber=028307... 12/26/2006 ' ' Alaska Department of Natural esources Land Administration System Page 4 of 7 ~ ~ FORMULA FOR ROYALTY VALUATIONREVISED 03-31-2000 CUSTOMER CHANGED NAME NEW NAME.• EXXON MOB~L CORPORATION OLD NAME: EXXON CORPORATION OS-10-2000 CUSTOMER CHANGED NAME NEW NAME: PHILLIPS ALASKA, INC. OLD NAME: ARCO ALASKA, INC. 08-03-2000 ASSIGNMENT APPROVED EFFECTIVE DATE 07-O1-2000 SEGMENT CODE 1 ASSIGNORS CID 000106600 EXXON MOBIL CORPORAT ASSIGNEES CID 000107377 BP EXPLORATION (ALAS WORKING INTER % ASSIGNED 13.157370 ROYALTY INTER % ASSIGNED 11.512700 08-03-2000 ASSIGNMENT APPROVED EFFECTNE DATE 07-01-2000 SEGMENT CODE 1 ASSIGNORS CID 000106600 EXXON MOBIL CORPORAT ASSIGNEES CID 000033073 MOBIL ALASKA E&P INC WORKING INTER % ASSIGNED .999800 ROYALTY INTER % ASSIGNED .874830 08-03-2000 ASSIGNMENT APPROVED EFFECTIVE DATE 07-O1-2000 SEGMENT CODE 1 ASSIGNORS CID 000106600 EXXON MOBIL CORPORAT ASSIGNEES CID 000034758 FORCENERGY INC WORKING INTER % ASSIGNED .020000 ROYALTY INTER % ASSIGNED .017500 08-03-2000 ASSIGNMENT APPROVED EFFECTIVE DATE 07-O1-2000 SEGMENT CODE 1 ASSIGNORS CID 000106346 PHILLIPS ALASKA, INC ASSIGNEES CID 000107377 BP EXPLORATION (ALAS WORKING INTER % ASSIGNED 13.507300 ROYALTY INTER % ASSIGNED 11.818890 08-03-2000 NOTIFICATION LESSEE CHANGED NEW NL (20) 20 NOTIFICATION LESSEE http://www.dnr. state. ak.us/las/Case_Abstract. cfin?FileType=ADL&FileNumbei =028307... 12/26/2006 ' " Alaska Department of Natural Resources Land Administration System Page 5 of 7 ~ ~ OLD NL (20) 20 NOTIFICATION LESSEE NEW NOTIF LESSEE CID# 000107377 BP EXPLORATION (ALAS OLD NOTIF LESSEE CID# 000106346 PHILLIPS ALASKA, INC 01-02-2001 COMMENTS OVERRIDING ROYALTYINTERESTS ARE NOT TRACKED AFTER INITIAL SEPARATION FROM THE WORKING INTEREST. CHECK THE APPROPRIATE RECORDER'S OFFICE. 03-30-2001 ASSIGNMENT APPROVED EFFECTIVE DATE 02-O1-2001 SEGMENT CODE 1 ASSIGNORS CID 000034758 FORCENERGY INC ASSIGNEES CID 000004134 FOREST OIL CORPORATI WORKING INTER % ASSIGNED .020000 ROYALTY INTER % ASSIGNED .017500 07-31-2001 CUSTOMER CHANGED NAME NEW NAME: EXXONMOBIL ALASKA PRODUCTION, INC. OLD NAME: MOBIL ALASKA E&P INC. 09-10-2001 AK NATURAL GAS TITLE REVIEW REPORT FIRST TWN COMPLETE 09-10-2001 LAST TWN COMPLETE 09-10-2001 09-21-2001 ASSIGNMENT APPROVED EFFECTNE DATE 07-01-2001 SEGMENT CODE 1 ASSIGNORS CID 000106600 EXXON MOBIL CORPORAT ASSIGNEES CID 000033073 EXXONMOBIL ALASKA PR WORKING INTER % ASSIGNED 35.822830 ROYALTY INTER % ASSIGNED 31344970 09-26-2002 CUSTOMER CHANGED NAME NEW NAME: CONOCOPHILLIPS ALASKA, INC. OLD NAME: PHILLIPS ALASKA, INC. 12-04-2002 ASSIGNMENT APPROVED EFFECTNE DATE 11-01-2002 SEGMENT CODE 1 ASSIGNORS CID 000107377 BP EXPLORATION (ALAS ASSIGNEES CID 000106539 CHEVRON U.S.A. 1NC WORKING INTER % ASSIGNED 309314 ROYALTY INTER % ASSIGNED .270650 http://www.dnr. state.ak.us/las/Case_Abstract.cfm?FileType=ADL&FileNumber-028307... 12/26/2006 ~ ' Alaska Department of Natura esources Land Administration System ~ ~ 12-04-2002 ASSIGNMENT APPROVED EFFECTIVE DATE 11-01-2002 SEGMENT CODE 1 ASSIGNORS CID 000106346 CONOCOPHILLIPS ALASK ASSIGNEES CID 000106539 CHEVRON U.S.A. INC WORKING INTER % ASSIGNED .423315 ROYALTY INTER % ASSIGNED .370401 12-04-2002 ASSIGNMENT APPROVED EFFECTIVE DATE 11-01-2002 SEGMENT CODE 1 ASSIGNORS CID 000033073 EXXONMOBIL ALASKA PR ASSIGNEES CID 000106539 CHEVRON U.S.A. INC WORKING INTER % ASSIGNED .427139 ROYALTY INTER % ASSIGNED .373747 12-04-2002 ASSIGNMENT APPROVED EFFECTIVE DATE I 1-O1-2002 SEGMENT CODE 1 ASSIGNORS CID 000004134 FOREST OIL CORPORATI ASSIGNEES CID 000106539 CHEVRON U.S.A. INC WORKING INTER % ASSIGNED .000232 ROYALTY INTER % ASSIGNED .000203 12-31-2002 STATUS CODE STANDARDIZED STATUS CODE 35 ISS/APPRV/ACTV AUTH * * * * * STATUS CODE STANDARDIZATION * * * * * STATUS CODE CHANGED BYBATCH UPDATE 12-04-2006 ASSIGNMENT APPROVED EFFECTNE DATE 09-01-2006 SEGMENT CODE 1 ASSIGNOR'S CID 000004134 FOREST OIL CORPORATI ASSIGNEE'S CID 000106346 CONOCOPHILLIPS ALASK WORKING INTER % ASSIGNED .007361 ROYALTY INTER % ASSIGNED .006441 12-04-2006 ASSIGNMENT APPROVED EFFECTIVE DATE 09-01-2006 SEGMENT CODE 1 ASSIGNOR'S CID 000004134 FOREST OIL CORPORATI ASSIGNEE'S CID 000107377 BP EXPLORATION (ALAS Page 6 of 7 http://www. dnr. state.ak.us/las/Case_Abstract. cfin?FileType=ADL&FileNumber=0283 07... 12/26/2006 ~ '' Alaska Department of Natural esources Land Aaministration System Page 7 of 7 ~ ~ WORKING INTER % ASSIGNED .005211 ROYALTY INTER % ASSIGNED .004560 12-04-2006 ASSIGNMENT APPROVED EFFECTIVE DATE 09-01-2006 SEGMENT CODE 1 ASSIGNOR'S CID 000004134 FOREST OIL CORPORATI ASSIGNEE'S CID 000033073 EXXONMOBIL ALASKA PR WORKING INTER % ASSIGNED .007196 ROYALTY INTER % ASSIGNED .006296 Legal Description OS-28-1965 *SALE NOTICE LEGAL DESCRIPTION* C14-128 I I N 14E UM 13,14, 23, 24 2560. 00 U- 3- 7 End of Case Abstrac~t Last updated on 12/26/2006. Not sure who to contact? Have a question about DNR? Visit the Pr~_blic In.formation Cent~r. Report technical problems with this page to the W.ebmas.Cer. Site optimized for Netscape 7, IE 6 or above. This site also requires that all CC7QKIES must be accepted. State af Alaska Natural_Resources LAS Home Copyri.ght Privacy Sysfem Status http://www. dnr. state. ak.us/las/Case_Abstract. cfm?FileType=ADL&FileNumber=02 8307... 12/26/2006 r- 1 U ~ a^ct Nario~a~ a ; hora9e, qK ~k q~aska }~ 9g50j ~~O_ 1 17_~f~_.-. ~erri ~ Bo okP/o a bo~e '~~~hora9e, qK 9g5 ~_bn~. 9 PAY r., _ . ~ _ . „~-aster~ard Check., 89_8/1252 3~s ~9TF Z ~ 1 ~~ y` `P ~ $ ~. ~~ ~; j 2 S 20006 , D: O~;q9i462~?i ~ 556a. 03 j6 i 0 ~ • ~'RAYSIVII~'T'AL LETTEIa C'FIECKLIS'I' `vEt,L r~~NtE ~B~/ Oa•~~8 ~Tn# do.6 - I~'d / Development Service Exploratory Sta-atigraphic ~'est Yoa-Conventiona! Welt Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter ~ CE~CK ADD-O~fS T'EX1" FOR APPROVAL LETT'ER ~ ~ VVHAT ~ (OPTIONS) ; i i APPL[ES ~ ~ ~ ~ - - ~ ~ I MliLTt LATERAL ~ The permit is for a new we(Ibore segment of existing ~ ~ ~ wefl ~ i(If la.st two digits ~ ~n i PecTnit ~(o. , AP[ No. ~0- - - ' ; API number ; between 60-69) are ; I Production should continue to be reported as a function of the ~ , I ~ ~ origina( AP[ number stated above. ; i ~ ~ P[LOT HOLE i[n accordance with 20 AAC 25.00~(~, all records, data and (ogs ~ ~ ; acquired for the pilot hole must be clear(y differentiated in both ' b d API n ( Pf- ; i um er n an ~ we(( name ( ~ i ~(~p_ - -_~ From records, data and logs ~ ~ ~ acquired for well I i i SPACING The permit is approved subject to full compliance with ZO AAC ~ ' ' EXCEPTION ~ 2~.0». Approvat to perforate and ~roduce / inJect is contingent i ~ ; I upon issuance of a conservation order approving a spacing j ; j I exception. assurnes the ~ ! ! ~ I i liability of any protest to the spacing exception that may occur. I - ; ; DRY D[TCH ~ ~ Al[ dcy ditch sample sets submitted to the Commission must be in ; i i SA!~tPLE i no greater than 30' sample intervals from below the permafrost or ~ ! , ! from where samples are first caught and 10' sample intervats j i ~ ~ ! through tar;et zones. ; ~ ~ ; Please note the folIowing specia! condition of this permi*_: ~ ~~Jon-Conventional ~ i production or production testing of coal bed methane is not allowed ; ; I~' z« ~ for (name of we(1) unti! after jCompanv Name) has desie ed and ! , i ' irnplemented a water well testing program to provide baseline data. I ; ~ ,' on water quality and quantity. S,Company Name) must contact the ' I ! Commission to obtain advance approval of such water we(l testing ; ~ I ~ Pc~O rarn• l Rev: t 2~i06 C:` jody~transmittal_checklist ~ ~ L~ '~ ~ N ~ ~ , ~ ~ ~, , ~ ~ , ~ ~ ~ , ~, ~ ~ ~ ~ ~ ~ o , a~ Q y ~ , ; ~ ~ , , ~ . , , , , , , ~ ~ , ~ ~ ~ ~ ~ N ~ ~ ~ , ~ , ~ ~ ~ ~ ~ ~ . ~ ~ , ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ . , ~ , ~ ~ ~ ~ , ~ ~ ~ ~ , ~ ~ ~ , O ~ ~ _ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ , , ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ , , ~ ~ ~ , ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ . ~ C ~ Q ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , , ~ ~ ~ , ~ , ~ ~ , ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ , , , , ~ ~ ~ , ~ , , , , ~ ~ , ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ y~ ~ ~ ~~~ ~ ~ ~ ~ ~ . , ~ ~ ~ , ~ ~ ~ ~ f6~ ~ ~ ~ ~ ~ ~ , , ~ , ~ ~ ~ , ~ . , ~ ~ ~ ~ ~ ~ 3~ ~ , ~ ~ ~ ~ ~ ~o~ _ ~ ~ ~ c O ~ , ~ , ~ ~ ~ ~ ~ , , ~ ~ , , , ~ ~ ~ ~ ~ m~ , , ~ ~ v ~~ ' ~ ~ , ~ N ~ ~,~~ ~ , ,, ,,~~ ~ , i ~ , ~~ ~ ~ m , ~~ ~~ ~ ~ ~ ~ m ~~ ~ i ~~ ~ ,, ~ t , , ~ °S c , W c~ ~ , ~ a ~ ~ ~~ m N , ~ ~ ~ , , , o , ~°~ '~ , , , , E O ~ , , , , fl. L~ a , m' t g' ~ ~ , , , , , ~ , ~ , , , m o 4 u a~ ~ ~ ~ ° d , ~ ~ , , ~ , ~ , ~ , ~ ~ , ~ ~ ~ , ~, . ~ ~, ao~ ~ ~0 ~ _, ~ ~ ~ ~ ~ , ~ , , , , , , m , 3 ~ 3, o i 1 ~ , , , , _ . Q , a , -d ~, , ~ , ~ , ~ o 'py ~ ; _ , , ~, 4 ~o ° ~ , a, 4 ~, , '~ m~ ~ , , , m' ~. .~n~ ~n ~, ~ a; , ° ar a °~ , ~~ ~ N i O~ . , ~ . ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~ Z ~ , o V)~ ~~ ~ m , ~ ~ ~ L~ I ( ~ ~ ~ ~ F, , ~ , , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~ y~ ~ ~ ~ ~ W~ , , ° ~ ~ ~~ ~ ~ , , ~ ~ Z , ~ , , ~ ~ ~, ~ ~ r , a ~ ~ }i . , , , ~ ~ ~ . ~ , , ~ ~ ~ ~ ~ ~ , ~ ~ , ~ ~ ~ ~ ~ , , , N~ , ~ O~ , ~ N , ~ ~, ~ ~ , Z, , ~p~ ~ ~, ~ ~~ N, V, ~ ~~~ Z M ~ .~, , ~ , ~ , i , ~ , , ~ ~ ~ ~ ~ QI . ~ ~ , ~ , ~ ~ ~ ~ ~ ~ ~ O~O~ ~, W~ ~~ ~ ~ , ~ ~ ~~ ~ ~ ~ ~ , T ~ ~ ~ ~ m~ W~ , ~ ~ ~ ~ ~ , ~ ~ ~ , ~ , ~ ~~ ~~, ~~ ~' . ~ ~, . 'a ~i Q , .~ ~ ~, a ~'~ ~ , , ~ m~ , ~ ~ . , ~ ~ ~ ~ ~ O~ , ~ ~~ ~~ ~~ ~~ , ~~ ~~ ~ ~ , ~ ~ ~ ~ ~ ~ °~ . ~~ ai ~ a ~~ ~~ , o~ ~ , ~ ~ ~ ~ o ~~ , ~, N 0 ~ C C ~ a i, ,ot, T ~ ~ '~O~ ~ N~ ~ N a ~ , ~~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ , , ~ ~ ~ ~ (~~ o -' - ~? ~, ~ ~ ~ L~ ~ • ~ ~ ~, ~ ~ a, , , a ~p , ~ , , , ~ w, m'vi, ~ m ~ ~ 3 •y, ~ ~, ~ i ia ui o ~ ~ N , ~ ~ ~ ~ , ~ ~ ~ ~ ~3 ~ ~ ~~ Y V~ N ~ ~ ~ ~ ~ m C~ , , ~ ~ ~ , , ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~' ~' ~' a ~ a ~ . ~ ~ T ~' E' ~, m ~ ~ Q Z ~~ ~~ ~~ N ~ ~ Y U) ~~ ~~ ~ ~' ~'' ~ ~ N, ' ~ ~ ~ , ((( \/~ ~ Z ~ ~ ~ ~~ , ~ , , ~ ~ , ~ ~ ; ~ O~ ~~ _~ ~, N ~'~ O • ~X~ O ~~ ~ Q, ~ N, ~ I ~ ~ , , ~~ ~ Y I a i ' U(n fn ~ ~ M d f~ ~ ~ 2, I O ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ , ~ , ~ , , I ~ a Vi' ~ } Vi~ N~ Vi~ M~ ~ ~, a~ ~ } ~- } } Vl~ ~ } Vl~ ~- ~, o: z ~ y~ UA N~ ~ ~ ~ ~ ~ ~ t~~ N ~, ~ ~ ~ ~ a; z ~ ~ , i a, Q a; ! z z ~ ~ : , a a a; a y~ N~ N~ ~~ ~ ~, ~ ~ N~ ~ N~ N~ N: ~, a ~ ~ ~, N~ N~ ~~ ~ ~ ~ ~, a ~ o ~ a ' .. a; a; a ~ , : , , , , , , , , z z z z z, , ~ ~ ~-, ~, ~, ~, ~, z, ~, ~, ~ . ~, ~, ~, z, z ~ z ~ z z ~ , z T i ~ i a , , ~ ' y (0 ~ ~ ~ , ~ ~ , , ~ ~ ~ ~ ~ ~ , , , ~ ~ , , ~ ~ ~ v, , ~ T , ~ ~ ~ ~ , , , , ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~ , ~ N ~ ~ V ~ , , ~ ~ ~, , , , , ~ , N, , C O' , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~~ C ~ , ~ ~ ~ ~ ~ , , ~ ~ , ~~ ~ ~~~ ~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ , , ~~ , , ~ ~ , ~ ~ , , ~ ~ ~, ~ ~ : , ~ , V. , U~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , , ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ , , ~ ~ ~ ~ ~ ~ , , , ~ ~ , , ~ ~ ~ .S ~~ ~ N~ , N , ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ . ~ , ~ ~ ~ ~ ~ ~ , ~ ~ . ~ , ~ ~ , ~ ~ ~ ~ , , ~ , ~ ~ ~ ~ , , ~ ~ ~ , ~ , , ~ , Q, ~ ~~ . , ~ ~ ~ ~ ~ , ~ ~ ~ , ~, ~ ~ ~ , ~ ~ ~, ~ ~ ~ ~ ~ , , ~ ~ , ~ ~ ~ ~ . , ~ . ~ ~ ~ , ~ ~ , , ~ LL~ . ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ , , , ~ ~ T ~ ~ ~ ~ ~ ~ E p °' c L , a ~ II ~ ~ , ~ ~, ~ , ~ ~ ~ ~ ~ *k' O~ C~ ~' ~ T O 0 ~, 0 3i ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ N~ 3 I . , , o ~ O, ~, M `~ ~ Z` ~ O o, Z, t 0~ m , , ~ , ~ m ~ v' ~ f6~ a~i ' ~', ~ N, ~ a , ~ ~ o ~ a `t, ~'~ O 2 ~ , , , , ~ y o, c, o, m ~ ~ ~ ~ Q ;~ m , m ~ ~ 5, ~ N , ~ ~ ~ 0 ~ ~ o , ~ , , , ~ a T a, -a, p Q, ~ N N o c . ~ ~ m a ~, ~ ~ ~ N ~ ~ 0 N ~ ~ ~ ~ ~, ~ ~ ~ ~ , 'a~ ~ -0~ ~ ~, ~, , , ~, U~ ` ~~ ~~ ~ ~~ ~ ~ ~~ ~ '~~ 00~ ~ ~ !G~ N~ C~ ~ , O f a ~ ~ ~ ~ 3~ ~ ~ N~ , ~ ~ ~ N '"' N ~ 'a~ ~ G , ~ ~ t~ O 7 C~ ~~ ~~ '~~~ ~ ~ N ~ , fl` ` ~ ~ ~ ~ ~~ > ~ E~ N~ ; ~ N . ` ~: ~ ~ , ~ ~ 3, •~ ~ o~ •~, 3 a a, ~ o, ~~ ~~ ~~ N ~ a ~~ , o~ ~ ~ Q ~ o ~ ~~~ a~ ~~ ~ ~n~ C t ~ ~ L ~ ~ ' Q ~ m Z W _ ~ ~ ~ ~ ~ ~ ~ ~-~~ ~ ~~ ~ , p-~, ~ ~ j, ~~ , 0~ ~~ y, 'C, '6 j, (0, ?~~ d ~~ N~ O. , , ~ ~~ p) ,~~ O~ G ~ ~ C' ~~ m~ ~ p~ f p' ~' 3 , w0, O~ p~ ~ , ~ ~, ~, , , a~ L~ ~ C y, N, ~' ~, p ~' O' Q = q ~ ~ ~ , ~ ~, ~ ~ E~ E~ _, ~, 'a~ ,`~~ Ul~ ,.S ~~ ' LLj ~ ~ - ~~„ fa >, r-~ ~ ~ M I ~ V ~~ . C C~ tA, >~ ~'O~ .~ ~ ~ w flr N~ ~ ~ ~ ~~ ~, ~~ ~ I ~ C~ N~ ~~ I ~ Ol ~ O, Q N L O: p) U) ~ C ° + \ ~ p ~ ° ° ~ ~, a o ° m ° ~ in o o' Q~ I o 3 ° ~ , 'o, ~ ~ U ~ . ~ ~ ~ o aS d .°- ~ ~3 ~ > m ~, Y ~~ ~, -n ' ~ ~~ O~ ~~ ~, . . ~ T O 7 3 ~ 'O f0 fp ~ I (6 ~~ 'Y ~~ p ~~ O ~~ f6~ ~~ ~~ Q~ (`~ ~~ tlD i T O~ pD p~ ~~ ~ .N ~ ~ Q , ~' , 4~ :: ~' ~ ~ ~` a~ io ~ a o' z o' ~ o n c ca ~ ~ ~' ~ y, I , ~ ~ - 5 -a, m ~ •~ Z a 4 ~ ,., ~~ ~m, ~- a~ o. 3 m o a~ I ~. Q~ ~ ' m 3~ - ' `~ ~ 3' E c . ~ m ~, a ~ N ~ m, fl; . ~~ fl, . 3 m , . -o 3 f0 ~ , a E, I a~ `. a~, -a y' ~' y ~ c~ ~' m' ~ o ~ ~n ~ m° '°' ~ ~' a y N o m' ui ~-' o c; ~ ~ >r m' a~ o' ~ w Q Z O ° c cc ~ a a~ c ? ~ > ~' o~ , ~~ a ~' , a~ v ~ , ' ` c, .o ~~ ~ o ~ a ~ °- ~' a ~-° ~ o rn ' o ~~ ~ ~; U o d ~- '6~ o (6, N ` , ~ ~ Ul O U , ` N o ~ O U , a i ~ O~ Y N ~ ~ o ~~ E~ N ~ c E L O I a N ~' 4- ~ pE$ N L~ p~ 'O' N' fl. 4 ~ N' 4 , ~, N ~~ ~ ~ 7' N , O. tA~ 7' O_ N. O C' . , ~ ' V U N~ i O' fl: N~ Q ~ ~ , , e- _"a ~ ~p~ N a f6' 01 ~ ~ ~, G LA' .-~ O' U~ ~3~ N~ ~ ~ 7' t/N C~ p~ tll, O' p ~ O t~ U~ ~ ~~ ~~ ~ O~ O~ ~ 3 ~ O. ,~i, . !%1, f6 y ,. ~ , G t~, h m f6 f9 ~~ f6 ~ ~ O ~ T' , ~ p . I ~ 2~ ~ ~ ~~ . N O, ~. a ~ ~ ~ ..~.~ ~~ ~~ C~ fl. fl. ~~ y T~~ N' N N, N ~ ~i' C, ' O1 ~ +-' C~T Or N~ G Y ~~ C N 7 ~ ~ ~ a fl- L Q j~ O. U O' V ~~ ~~ j, " ~ N~ ~ - Il n. IU~ ~ ~~ _~ -p~ -a~ ~~, ~ m -O~ m V~ m, ~, ~~ ~~ ~~ o r c, ~, c, ~ ~ a~ ~~ ~~ . c~ c, ~ N~ N~ N~ ~; v a ' ` >~ .~ L~ o~n ~' , ' ' .. N . 3; ~', ~° o N. ~ ~ w ~ ~ o m ' ~' ~~ c a~i ~~ ~. o m " X ~ w ~ ~ ;, m ~u c ~ u m o ~ ~ m 0 0 ~ m E ~' ca ~ 3 ~ a~ I > ~n, ~' , ~ o ~ m m ~ o o _ ~ ~ ~_ - -o ` ~, ~ -~ ~ °~ a m - o _ c ' E' . ~" m ~' ~ ~' ~ ~ ci ~ c ~ d , m°~, o o o ,~ ,~. , ~ o. c o 0 a~ 3 ~>> m v 3' ~~ m, ~~ a> ~'' c ui 3~' m' -- d '' a °i' ~' ao ~ r~ pp ~ E' ~ v -' -' ~ ~ `~ ` ~ ~ c - 3°~ ~ ~ -~' , m H H F- N' ~~ ~> ~ a a, ~~'' ~' I a' E' m w, ~ c ~ ~ , ar ~ °~ ~ °~ , a i, ~ a a a > 4 4 a~ , a~ m ~ - ~' o ~ o ~ ~, ~' , ~' ~ v f6 v ~ '_ O O , ~ ° a °~ ~ , m ~ (J ~, _~ a, ~ ~ ~',~ ~', u~~ ooa' a'c~ ~ ¢;a'z,~ v,~~~,~, ~~v,Q~- ~ , . Q,-omm ~ c~~; ~''~~~ a~ o; ~~~- v, ~ ~ ~ I ~- ~ ~ O N M d' ~(4 I~ i ~ 00 m O N M~t ~ (D I~ 00 ~ O r N M V I ~ (O I~ 00 ~ ~~ . p ~ N M V ~ - -- (O _ I~ a0 __.__- ~ ~ ~ -- - ~ ~ ~ a- r! c~ . - ~ r N N ~-- N N N N _ --_ N N N N M - _ M M M M __ --________.' M ___- M _-_ M M -- - - M __ • V co ° ! co ° ~ co ° ~, ~ o ~ N i o ~ N o w N a~ V~ \ s: ~ .. ~ O i ~ N ~ ~~~ ~ C ~ N '~. ~ I ~ N ~ ~ t/1 ~ ~ ~ J ~ i N y I d ~~ T C~ E ~ ~ ~ G ~ I ~ G. ~ ~ G. ~ U , a a a a W Q~ ~ a a • Well History File APPENDI~ Information of detailed nature that is not • panicula~iy geRnane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simpl'rfy finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efifori has been made to chronologically . organize this category of information. ~ • , ~ **** REEL HEADER **** MWD OS/02/07 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/06/08 1442140 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! ExtYaCt File: ldwg.l'cls -Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame ~Well Information Block #MNEM.UNIT Data Type Information #--------- ------------- ------------------------------- STRT.FT 9696.0000: Starting Depth STOP.FT 12205.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 02-18B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 16' 16.520"N 148 deg 29' 0.619"W 95' FNL, 764' FEL CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 07-Jun-07 API . API NUMBER: 500292045402 ~Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 36 . TOWN.N T11N . RANG. R14E . PDAT. MSL . EPD .F 0 . LMF . RF . FAPD.F 64 , DMF . RF . EKB .F 0 . EDF .F 64 . EGL .F 0 . CASE.F N/A . OS1 . DIRECTIONAL . ~Remarks ~o(o ~l ~S(o ~ E~9~b Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 • • (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (SSTVD) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and outer pownhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Schlumberger MCNL dated 8-Jun-2007. (8) The sidetrack was dril2ed from 02-18 through a milled window in 4.5~~ liner. Top of window 10010 ft.MD (8525.0 ft.SSTVD) Bottom of window 10019 ft.MD (8533.0 ft.SSTVD) (9) The openhole sidetrack was milled off a whipstock set at 11075'MD/8774'TVDSS. (10) Tied to C-32B at 10109 ft.MD (8750.0 ft.SSTVD) (11) The interval from 12144 to 12205 ft.MD (8766 ft to 8770 ft.SSTVD) was not logged due to sensor bit offset at TD.. MNEMONICS: GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-API units) ROPA -> Rate of Penetration, feet/hour RACLX -> Compensated Attenuation Resistivity Borehole Corrected (LS) [MWD] (400kHz) ,Ohm-m RACHX -> Compensated Attenuation Resistivity Borehole Corrected (LS) [MWD](2MHz),Ohm-m RPCLX -> Compensated Phase Difference Resistivity Borehole Corrected (LS)[MWD](400kHz),Ohm-m RPCHX -> Compensated Phase Difference Resistivity Borehole Corrected (LS)[MWD)(2MHz),Ohm-m TVD -> Subsea True Vertical Depth, feet CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9705,05, 9704.22, ! -0.830078 9705.47, 9705.47, ! 0 9708.16, 9708.37, ! 0.207031 9711.62, 9711.62, ! 0 9713.7, 9713.91, ! 0.207031 9715.15, 9715.56, ! 0.414062 9718.05, 9718.05, ! 0 9720.02, 9719.6, ! -0.415039 9723.03, 9724.27, ! 1.24414 9725.72, 9728.21, ! 2.4873 9735.46, 9732.77, ! -2.69434 9740.44, 9739.4, ! -1.03711 9742.3, 9741.06, ! -1.24316 9744.38, 9743.96, ! -0.415039 9748.94, 9748.73, ! -0.207031 9750.45, 9750.66, ! 0.207031 9754.39, 9754.8, ! 0.415039 9755.42, 9756.25, ! 0.830078 10017.4, 10016.2, ! -1.24316 10017.8, 10016.4, ! -1.45117 10018.9, 10017.8, ! -1.03613 10020.3, 10019.1, ! -1.24414 10024.1, 10022.9, ! -1.24414 10026.4, 10025.4, ! -1.03711 10043.2, 10047.8, ! 4.56055 10045.9, 10050.5, ! 4.56055 10062.4, 10060.2, ! -2.28027 , ~ ~ 10063.5, 10062.2, ! -1.24414 10065.3, 10064.5, ! -0.829102 10067.6, 10066.4, ! -1.24316 10069.9, 10068, ! -1.86523 10071.6, 10070.9, ! -0.62207 10074.5, 10073, ! -1.45117 10075.7, 10075, ! -0.62207 10078.1, 10077.5, ! -0.62207 10079.8, 10078.8, ! -1.03613 10082.1, 10082.9, ! 0.829102 10084.4, 10085, ! 0.62207 10090.8, 10089, ! -1.86621 10093.9, 10092.2, ! -1.6582 10095.4, 10094.2, ! -1.24414 10101.4, 10098.9, ! -2.4873 10102, 10100.3, ! -1.6582 10102.4, 10101.6, ! -0.829102 10104.5, 10105.7, ! 1.24414 10111.7, 10110.7, ! -1.03711 10113, 10112.3, ! -0.621094 10114.2, 10113.4, ! -0.829102 10115.2, 10116.1, ! 0.830078 10117.3, 10118.4, ! 1.03711 10121.3, 10119.4, ! -1.86523 10123.7, 10121.5, ! -2.28027 10124.4, 10123.5, ! -0.829102 10126.9, 10126.4, ! -0.415039 10130.8, 10129.8, ! -1.03711 10133.8, 10133, ! -0.830078 10139.4, 10137.7, ! -1.65918 10141, 10139.6, ! -1.45117 10142.1, 10140.4, ! -1.6582 10152.6, 10150.3, ! -2.28027 10153.5, 10151, ! -2.4873 10154.7, 10153.4, ! -1.24414 10155.6, 10154.5, ! -1.03711 10163, 10161.8, ! -1.24414 10166.1, 10164.7, ! -1.45117 10170.1, 10168.2, ! -1.86621 10171.3, 10169.6, ! -1.6582 10171.7, 10170.5, ! -1.24414 10174.2, 10173.1, ! -1.03613 10174.8, 10174.2, ! -0.62207 10190, 10188.5, ! -1.45117 10192.9, 10191.8, ! -1.03613 10194.4, 10194, ! -0.414062 10198.1, 10197.3, ! -0.829102 10203.2, 10200.3, ! -2.90234 10206, 10204.2, ! -1.86523 10207, 10205.1, ! -1.86621 10208.9, 10206.6, ! -2.28027 10224.3, 10224.5, ! 0.207031 10226.8, 10226.8, ! 0 10232.6, 10231.1, ! -1.45117 10235, 10233.3, ! -1.6582 10235.6, 10233.9, ! -1.6582 10236.5, 10234.6, ! -1.86523 10238.3, 10236.4, ! -1.86523 10240.9, 10240.3, ! -0.621094 10244, 10243, ! -1.03613 10252.8, 10250.7, ! -2.07324 10254.7, 10252.2, ! -2.48828 10255.9, 10254.1, ! -1.86523 10259.4, 10257, ! -2.4873 10262.1, 10263.8, ! 1.65918 10273.4, 10271.8, ! -1.6582 10274.7, 10273.2, ! -1.45117 ~ ~ 10276.9, 10275.2, ! -1.6582 10279.8, 10277.9, ! -1.86523 10281, 1 0279.5, ! -1.45117 10282.7, 10281.4, ! -1.24414 10292.4, 10290.5, ! -1.86621 10295.5, 10293.4, ! -2.07324 10297, 10294.8, ! -2.28027 10297.9, 10297.3, ! -0.62207 10308.2, 10306.3, ! -1.86621 10310.8, 10310.2, ! -0.62207 10314.4, 10313.4, ! -1.03613 10366.9, 10361.3, ! -5.59766 10369.4, 10363.4, ! -6.01172 10396, 10392.7, ! -3.31641 10398.3, 10395.2, ! -3.10938 10400.2, 10396.9, ! -3.31738 10405.8, 10402.6, ! -3.10938 10410.5, 10406.5, ! -3.93848 10412.2, 10407.8, ! -4.35254 10418.6, 10416.3, ! -2.28027 10422.5, 10420.4, ! -2.07324 10426, 10422.9, ! -3.10938 10427.9, 10425.2, ! -2.69531 10430, 10427.5, ! -2.4873 10433.3, 10431, ! -2.28027 10438.5, 10434.3, ! -4.14648 10443.9, 10438.9, ! -4.97559 10446.3, 10444.9, ! -1.45117 10454, 10452.4, ! -1.6582 10456.7, 10455.3, ! -1.45117 10466, 10461.3, ! -4.76758 10469.8, 10466.7, ! -3.10938 10477.6, 10475.4, ! -2.2793 10481.2, 10478.7, ! -2.4873 10496.9, 10494, ! -2.90234 10501.5, 10501.1, ! -0.415039 10503.8, 10504.4, ! 0.621094 10520.6, 10518.2, ! -2.4873 10523.3, 10520.6, ! -2.69531 10526.5, 10522.9, ! -3.52441 10529.1, 10525.2, ! -3.93848 10531, 10526.7, ! -4.35352 10533, 10528.7, ! -4.35352 10535.5, 10532.6, ! -2.90137 10537.7, 10535.2, ! -2.4873 10539.6, 10538.2, ! -1.45117 10543.4, 10542.4, ! -1.03711 10546.7, 10545.5, ! -1.24414 10551.8, 10548.7, ! -3.10938 10554.3, 10552.4, ! -1.86523 10557.5, 10555, ! -2.4873 10562.7, 10558.9, ! -3.73145 10586.2, 10580.8, ! -5.38965 10587.5, 10581.9, ! -5.59668 10588.3, 10582.9, ! -5.38965 10620.2, 10617.9, ! -2.28027 10622.4, 10619.9, ! -2.4873 10623.5, 10621.3, ! -2.28027 10651, 10651.5, ! 0.414062 10656.6, 10655, ! -1.6582 10659.1, 10658.1, ! -1.03711 10664.8, 10663.1, ! -1.6582 10665.8, 10663.9, ! -1.86523 10698.8, 10697.3, ! -1.45117 10700.2, 10699.6, ! -0.62207 10702.1, 10701.1, ! -1.03613 10727.5, 10726.4, ! -1.03613 ~ . ~ ~ 10729.5, 10728.5, ! -1.03613 10736.6, 10733.5, ! -3.10938 10737.6, 10734.7, ! -2.90234 10740.3, 10736.1, ! -4.14648 10745, 1 0741,1, ! -3.93848 10746.1, 10742.4, ! -3.73145 10749.4, 10745.7, ! -3.73145 10867.1, 10869.4, ! 2.28027 10868.7, 10870.4, ! 1.6582 10870.8, 10872.7, ! 1.86621 10875.8, 10876, ! 0.207031 10882.3, 10879.8, ! -2.4873 10884.4, 10882.7, ! -1.65918 10886.3, 10885.1, ! -1.24414 10887.9, 10885.8, ! -2.07227 10890.3, 10887.8, ! -2.4873 10892.5, 10890.3, ! -2.28027 10894.4, 10892.3, ! -2.07324 10895.8, 10893.7, ! -2.07324 10897.2, 10895.4, ! -1.86523 10899.9, 10898.3, ! -1.6582 10903, 10900.3, ! -2.69434 10904, 10902, ! -2.07324 10906.8, 10904.3, ! -2.4873 10911.7, 10908.4, ! -3.31641 10921.6, 10919.9, ! -1.6582 10973.5, 10970.4, ! -3.10938 11003, 11001.5, ! -1.45117 11023.1, 11019.4, ! -3.73145 11026, 11022.1, ! -3.93848 11032.6, 11030, ! -2.69434 11033.1, 11030.8, ! -2.28027 11034.9, 11032.2, ! -2.69434 11036.2, 11034.1, ! -2.07324 11038.5, 11035.6, ! -2.90234 11039.9, 11036.4, ! -3.52441 11041.6, 11038, ! -3.52441 11042.8, 11039.3, ! -3.52441 11044.5, 11041.1, ! -3.31738 11045.7, 11042.2, ! -3.52441 11047.4, 11044.1, ! -3.31738 11049, 11046.3, ! -2.69531 11051.1, 11049.9, ! -1.24414 11054.8, 11053.2, ! -1.65918 11056.7, 11056.3, ! -0.415039 11082.6, 11081.4, ! -1.24414 11084.9, 11084.1, ! -0.829102 11113.1, 11110, ! -3.10938 11125.8, 11122.5, ! -3.31641 11128.3, 11125.2, ! -3.10938 11147.8, 11143.2, ! -4.56055 11150.7, 11146.5, ! -4.14551 11152.6, 11147.8, ! -4.76855 11153.6, 11150.3, ! -3.31641 11155.2, 11152.5, ! -2.69434 11157.3, 11156.1, ! -1.24414 11160, 11157.1, ! -2.90137 11161.7, 11159.6, ! -2.07227 11163.7, 11160.6, ! -3.10938 11168.9, 11164.1, ! -4.76758 11171.8, 11167.9, ! -3.93848 11175, 11173.3, ! -1.6582 11178.1, 11175.8, ! -2.28027 11179.9, 11177.2, ! -2.69434 11182.8, 11179.9, ! -2.90137 11186, 11183.3, ! -2.69434 11191.1, 11187, ! -4.14551 C~ ~ 11194.5, 11191.8, 11200.6, 11197.1, 11201.5, 11197.9, 11203, 11198.9, 11203.9, 11200, 11205.5, 11201.8, 11206.8, 11202.8, 11207.9, 11204.6, 11211.8, 11207, 11216.4, 11210.6, 11219.5, 11213.5, 11227.3, 11219, 11229.4, 11220.9, 11233.5, 11226, 11234.8, 11228, 11236.5, 11230.9, 11238.2, 11231.8, 11243.4, 11237.4, 11255.7, 11250.3, 11256.4, 11251.5, 11260, 11257.7, 11266.6, 11261.7, 11273.8, 11264.7, 11278.7, 11273.3, 11281.8, 11275.3, 11289, 11281.6, 11296.7, 11286.5, 11299.2, 11291.7, 11300, 11293.8, 11304.4, 11297.7, 11305.8, 11298.8, 11319.3, 11310, 11328.6, 11320.9, 11330.1, 11322.4, 11331.9, 11324.3, 11333.4, 11326.5, 11336.3, 11329.6, 11338.6, 11332.1, 11340, 11334.8, 11343.3, 11337.5, 11370, 11367.3, 11372.5, 11370, 11377.5, 11372.1, 11381.6, 11373.3, 11385.3, 11376.2, 11390.1, 11377.5, 11393.2, 11381.2, 11395.6, 11387.3, 11397, 11387.8, 11402.1, 11394.5, 11405.2, 11398.6, 11406.9, 11401.3, 11408.4, 11403.8, 11409.8, 11405.9, 11412.1, 11409, 11416.2, 11412.3, 11422.6, 11413.7, 11428.2, 11417.8, 11430.9, 11419.9, 11434.3, 11425.2, 11441.6, 11437.9, 11446.4, 11443.5, 11448.2, 11445.5, 11481.9, 11482.8, 11485.9, 11486.7, 11490, 11488.2, 11493.5, 11490, ! -2.69434 ! -3.52344 ! -3.52344 ! -4.14551 ! -3.93848 ! -3.73145 ! -3.93848 ! -3.31641 ! -4.76758 ! -5.80469 ! -6.01172 ! -8.29199 ! -8.49902 ! -7.46289 ! -6.84082 ! -5.59668 ! -6.42578 ! -6.01172 ! -5.38965 ! -4.97559 ! -2.28027 ! -4.97461 ! -9.12109 ! -5.38965 ! -6.42676 ! -7.46289 ! -10.1572 ! -7.46191 ! -6.21973 ! -6.63281 ! -7.04785 ! -9.32812 ! -7.66992 ! -7.66992 ! -7.66992 ! -6.84082 ! -6.63379 ! -6.42578 ! -5.18262 ! -5.80371 ! -2.69434 ! -2.4873 ! -5.38965 ! -8.29199 ! -9.12109 ! -12.6455 ! -12.0234 ! -8.29199 ! -9.12109 ! -7.66992 ! -6.63379 ! -5.59668 ! -4.56055 ! -3.93945 ! -3.10938 ! -3.93848 ! -8.91406 ! -10.3643 ! -10.9863 ! -9.12109 ! -3.73145 ! -2.90234 ! -2.69434 ! 0.829102 ! 0.829102 ! -1.86523 ! -3.52441 . r~ ~ 11496.5, 11493.4, ! -3.10938 11497.9, 11494.6, ! -3.31641 11499, 11495.6, ! -3.31641 11501, 11497.7, ! -3.31641 11503.1, 11501.7, ! -1.45117 11512.9, 11506.2, ! -6.63281 11514.4, 11509.6, ! -4.76758 11517, 11511.8, ! -5.18262 11518.7, 11515.4, ! -3.31738 11520, 11518.3, ! -1.6582 11524.1, 11519.8, ! -4.35352 11526.4, 11525.2, ! -1.24414 11527.6, 11527.2, ! -0.414062 11531.8, 11528.3, ! -3.52441 11536.3, 11533.8, ! -2.4873 11538.6, 11535.7, ! -2.90137 11541.9, 11540.4, ! -1.45117 11546, 11543.1, ! -2.90234 11548.2, 11546.4, ! -1.86523 11552.4, 11550.9, ! -1.45117 11560.7, 11555.1, ! -5.59766 11566.1, 11562.1, ! -3.93848 11568.1, 11565, ! -3.10938 11570.5, 11567.6, ! -2.90234 11573.2, 11572.2, ! -1.03711 11577, 11577.6, ! 0.621094 11595.8, 11592.7, ! -3.10938 11597.7, 11595.4, ! -2.28027 11600.6, 11598.1, ! -2.4873 11615.1, 11609.1, ! -6.01074 11617.8, 11612.4, ! -5.38965 11622.8, 11619, ! -3.73047 11625.2, 11621.9, ! -3.31738 11649.7, 11646.8, ! -2.90234 11653.5, 11649.9, ! -3.52441 11663.2, 11659.5, ! -3.73145 11670, 11664, ! -6.01172 11689.7, 11685.1, ! -4.56055 11693.3, 11690.4, ! -2.90234 11723.3, 11723.9, ! 0.62207 11737.6, 11733.7, ! -3.93945 11747.4, 11741.8, ! -5.59668 11892, 11890.2, ! -1.86523 11894.1, 11892.3, ! -1.86621 11895.2, 11894.1, ! -1.03613 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 416 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 ~ 1024 ~~ ~ *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 2-18B 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 02-18B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** ~ !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Schlumberger MCNL dated 08-Jun-2007 *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ----------- - CNAM ODEP GR - ----- GR ------------ GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 140 Tape File Start Depth = 9696.000000 Tape File End Depth = 12205.000000 Tape File Level Spacing = 0.500000 ~ Tape File Depth Units **** FILE TRAILER **** Tape Subfile: 2 Minimum record length: Maximum record length: = feet 153 records... 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 2-18B.xtf LCC 150 CN BP Exploration (Alaska) WN 02-18B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM Cf~F1N DIMT CNAM ODEP ---------------------------------------------------- GRAX GRAX GRAX 0.0 ROPS ROPS ROPA 0.0 RACL RACL RACLX 0.0 RACH RACH RACHX 0.0 RPCL RPCL RPCLX 0.0 RPCH RPCH RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 • FF2AME SPACE = 0.250 * F ONE DEPTH PER FRAME r~ ~ Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 4 4 2 ROPS MWD 68 1 F/HR 4 4 3 RACL MWD 68 1 OHMM 4 4 4 RACH MWD 68 1 OHMM 4 4 5 RPCL MWD 68 1 OHMM 4 4 6 RPCH MWD 68 1 OHMM 4 4 24 Total Data Rec ords: 279 Tape File Start Depth = 9696.000000 Tape File End Depth = 12204.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 292 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/06/08 1442140 O1 **** REEL TRAILER **** MWD 08/02/07 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~ i . Tape Subfile 1 is type: LIS ~ • ~ W i C Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.5000 41.8839 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 57.7645 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.2057 39.6204 0.1644 0.1927 10100.0000 87.3862 24.9067 2179.3999 6064.5400 130.8446 87.6463 10200.0000 24.3762 14.6000 2179.3999 1223.5251 120.2203 115.3875 10300.0000 37.4756 51.2986 2179.3999 6064.5400 276.0020 173.2809 10400.0000 28.9280 57.6179 2179.3999 187.9814 97.7166 103.5627 10500.0000 42.0876 77.3620 2179.3999 6064.5400 378.7450 227.5939 10600.0000 24.2218 25.3414 2179.3999 6064.5400 75.6604 57.2348 10700.0000 32.6568 69.6430 2179.3999 6064.5400 305.2670 246.0531 10800.0000 39.3117 79.3756 2179.3999 6064.5400 201.9380 164.7540 10900.0000 154.4704 46.8141 2179.3999 6064.5400 231.7055 401.5262 11000.0000 49.4160 118.4846 2179.3999 6064.5400 117.8310 94.3466 11100.0000 32.4126 77.8247 2179.3999 6064.5400 95.8776 85.5630 11200.0000 118.1855 136.3188 2179.3999 130.1460 108.6510 141.5942 11300.0000 41.8493 41.3000 2179.3999 163.5404 45.5605 89.1983 11400.0000 180.9214 30.7639 2179.3999 6064.5400 72.6123 7188.8896 11500.0000 164.9694 34.3386 2179.3999 52.6025 ~ 49.7090 22.4579 11600.0000 78.9161 43.3861 123.2500 113.7290 11700.0000 69.8974 93.7207 105.0446 93.8850 11800.0000 67.8839 96.8519 107.5574 94.5410 11900.0000 63.5592 80.6408 98.6850 90.1800 12000.0000 66.5639 44.7201 100.4890 95.0070 12100.0000 52.4301 111.0195 74.5350 80.6860 12200.0000 -999.2500 53.3484 -999.2500 -999.2500 12205.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 12205.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet ~ 2179.3999 6064.5400 2179.3999 6064.5400 2179.3999 6064.5400 2179.3999 6064.5400 2179.3999 6064.5400 2179.3999 180.0870 -999.2500 -999.2500 -999.2500 -999.2500 ,,. , ~ r: ~ 139.1540 29.8540 11600.0000 74.7000 112.8000 128.9520 109.3690 11700.0000 76.6000 90.0000 104.4740 - 91.3730 11800.0000 66.5000 94.2000 108.6510 94.5410 11900.0000 62.1000 81.9000 98.6850 90.1800 12000.0000 64.0000 44.2000 100.4890 95.0070 12100.0000 57.1000 103.0000 74.5350 78.2650 12200.0000 -999.2500 48.9000 -999.2500 -999.2500 12204.7500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 12204.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 -999.2500 -999.2500 6064.5400 6064.5400 6064.5400 6064.5400 6064.5400 186.4800 -999.2500 -999.2500 .,, , , n ~ Tape Subfile 4 is type: LIS n ~~ C~ **** REEL HEADER **** MWD 08/02/13 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 01/06/08 1442140 01 3.0" CTK *** LIS COMMENT RECORD *** iiiiiillii iiii~iii~ Remark !!!!!!!!~! ~~!!!!!!! Extract ~Version I nformation VERS. 1.20: WRAP. N0: ~Well Info rmation Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9696.0000: STOP.FT 11917.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: 95' FNL, 764' CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NUMBER: ~Parameter Information Block #MNEM.UNIT Value ~ File Version 1.000 File: ldwg.las CWLS log ASCII Standard -VERSION 1.20 One line per frame Information Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. 02-18B PBl Prudhoe Bay Unit 70 deg 16' 16.520"N 148 deg 29' 0.619"W FEL North Slope Alaska Baker Hughes INTEQ 3.0" CTK O1-Jun-07 50029204540270 #--------- ------------------------- SECT. 36 . TOWN.N T11N . RANG. R14E . PDAT. MSL . EPD . F 0 . LMF . RF . FAPD.F 64 . DMF . RF . EKB .F 0 . EDF .F 64 . EGL .F 0 . CASE.F N/A . OS1 . DIRECTIONAL . Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ~o~ -~~~ ~i59 ~9 i ~ ~Remarks (1) Al1 depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (SSTVD) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulatinq Sub, a Drilling Performance Sub (Inner and Outer pownhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Schlumberger MCNL dated 8-Jun-2007. (8) The sidetrack was drilled £rom 02-18 through a milled window in 4.5" liner. Top of window 10010 ft.MD (8525.0 ft.SSTVD) Bottom of window 10019 ft.MD (8533.0 ft.SSTVD) (9) Tied to 02-18 at 9752 ft.MD (8295.96 ft.SSTVD) (10) Multiple Propagation Resistivity data is presented only to display curve response. The numerical values are suspect and should be considered inaccurate. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) (400kHz),Ohm-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) (2MHz),Ohm-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9705.05, 9704.22, ! -0.830078 9705.47, 9705.47, ! 0 9708.16, 9708.37, ! 0.207031 9711.62, 9711.62, ! 0 9713.7, 9713.91, ! 0.207031 9715.15, 9715.56, ! 0.414062 9718.05, 9718.05, ! 0 9720.02, 9719.6, ! -0.415039 9723.03, 9724.27, ! 1.24414 9725.72, 9728.21, ! 2.4873 9735.46, 9732.77, ! -2.69434 9740.44, 9739.4, ! -1.03711 9742.3, 9741.06, ! -1.24316 9744.38, 9743.96, ! -0.415039 9748.94, 9748.73, ! -0.207031 9750.45, 9750.66, ! 0.207031 9754.39, 9754.8, ! 0.415039 9755.42, 9756.25, ! 0.830078 10017.4, 10016.2, ! -1.24316 10017.8, 10016.4, ! -1.45117 10018.9, 10017.8, ! -1.03613 10020.3, 10019.1, ! -1.24414 10024.1, 10022.9, ! -1.24414 10026.4, 10025.4, ! -1.03711 10043.2, 10047.8, ! 4.56055 10045.9, 10050.5, ! 4.56055 10062.4, 10060.2, ! -2.28027 10063.5, 10062.2, ! -1.24414 ~ 10065.3, 10064.5, 10067.6, 10066.4, 10069.9, 10068, 10071.6, 10070.9, 10074.5, 10073, 10075.7, 10075, 10078.1, 10077.5, 10079.8, 10078.8, 10082.1, 10082.9, 10084.4, 10085, 10090.8, 10089, 10093.9, 10092.2, 10095.4, 10094.2, 10101.4, 10098.9, 10102, 10100.3, 10102.4, 10101.6, 10104.5, 10105.7, 10111.7, 10110.7, 10113, 10112.3, 10114.2, 10113.4, 10115.2, 10116.1, 10117.3, 10118.4, 10121.3, 10119.4, 10123.7, 10121.5, 10124.4, 10123.5, 10126.9, 10126.4, 10130.8, 10129.8, 10133.8, 10133, 10139.4, 10137.7, 10141, 10139.6, 10142.1, 10140.4, 10152.6, 10150.3, 10153.5, 10151, 10154.7, 10153.4, 10155.6, 10154.5, 10163, 10161.8, 10166.1, 10164.7, 10170.1, 10168.2, 10171.3, 10169.6, 10171.7, 10170.5, 10174.2, 10173.1, 10174.8, 10174.2, 10190, 10188.5, 10192.9, 10191,8, 10194.4, 10194, 10198.1, 10197,3, 10203.2, 10200,3, 10206, 10204.2, 10207, 10205.1, 10208.9, 10206.6, 10224.3, 10224.5, 10226.8, 10226.8, 10232.6, 10231.1, 10235, 10233.3, 10235.6, 10233.9, 10236.5, 10234.6, 10238.3, 10236.4, 10240.9, 10240.3, 10244, 10243, ! 10252.8, 10250.7, 10254.7, 10252.2, 10255.9, 10254.1, 10259.4, 10257, 10262.1, 10263.8, 10273.4, 10271.8, 10274.7, 10273.2, 10276.9, 10275.2, ! -0.829102 ! -1.24316 ! -1.86523 ! -0.62207 ! -1.45117 ! -0.62207 ! -0.62207 ! -1.03613 ! 0.829102 ! 0.62207 ! -1.86621 ! -1.6582 ! -1.24414 ! -2.4873 ! -1.6582 ! -0.829102 ! 1.24414 ! -1.03711 ! -0.621094 ! -0.829102 ! 0.830078 ! 1.03711 ! -1.86523 ! -2.28027 ! -0.829102 ! -0.415039 ! -1.03711 ! -0.830078 ! -1.65918 ! -1.45117 ! -1.6582 ! -2.28027 ! -2.4873 ! -1.24414 ! -1.03711 ! -1.24414 ! -1.45117 ! -1.86621 ! -1.6582 ! -1.24414 ! -1.03613 ! -0.62207 ! -1.45117 ! -1.03613 ! -0.414062 ! -0.829102 ! -2.90234 ! -1.86523 ! -1.86621 ! -2.28027 ! 0.207031 ! 0 ! -1.45117 ! -1.6582 ! -1.6582 ! -1.86523 ! -1.86523 ! -0.621094 -1.03613 ! -2.07324 ! -2.48828 ! -1.86523 ! -2.4873 ! 1.65918 ! -1.6582 ! -1.45117 ! -1.6582 • C~ 10279.8, 10277.9, ! -1.86523 10281, 10279.5, ! -1.45117 10282.7, 10281.4, ! -1.24414 10292.4, 10290.5, ! -1.86621 10295.5, 10293.4, ! -2.07324 10297, 10294.8, ! -2.28027 10297.9, 10297.3, ! -0.62207 10308.2, 10306.3, ! -1.86621 10310.8, 10310.2, ! -0.62207 10314.4, 10313.4, ! -1.03613 10366.9, 10361.3, ! -5.59766 10369.4, 10363.4, ! -6.01172 10396, 10392.7, ! -3.31641 10398.3, 10395.2, ! -3.10938 10400.2, 10396.9, ! -3.31738 10405.8, 10402.6, ! -3.10938 10410.5, 10406.5, ! -3.93848 10412.2, 10407.8, ! -4.35254 10418.6, 10416.3, ! -2.28027 10422.5, 10420.4, ! -2.07324 10426, 10422.9, ! -3.10938 10427.9, 10425.2, ! -2.69531 10430, 10427.5, ! -2.4873 10433.3, 10431, ! -2.28027 10438.5, 10434.3, ! -4.14648 10443.9, 10438.9, ! -4.97559 10446.3, 10444.9, ! -1.45117 10454, 10452.4, ! -1.6582 10456.7, 10455.3, ! -1.45117 10466, 10461.3, ! -4.76758 10469.8, 10466.7, ! -3.10938 10477.6, 10475.4, ! -2.2793 10481.2, 10478.7, ! -2.4873 10496.9, 10494, ! -2.90234 10501.5, 10501.1, ! -0.415039 10503.8, 10504.4, ! 0.621094 10520.6, 10518.2, ! -2.4873 10523.3, 10520.6, ! -2.69531 10526.5, 10522.9, ! -3.52441 10529.1, 10525.2, ! -3.93848 10531, 10526.7, ! -4.35352 10533, 10528.7, ! -4.35352 10535.5, 10532.6, ! -2.90137 10537.7, 10535.2, ! -2.4873 10539.6, 10538.2, ! -1.45117 10543.4, 10542.4, ! -1.03711 10546.7, 10545.5, ! -1.24414 10551.8, 10548.7, ! -3.10938 10554.3, 10552.4, ! -1.86523 10557.5, 10555, ! -2.4873 10562.7, 10558.9, ! -3.73145 10586.2, 10580.8, ! -5.38965 10587.5, 10581.9, ! -5.59668 10588.3, 10582.9, ! -5.38965 10620.2, 10617.9, ! -2.28027 10622.4, 10619.9, ! -2.4873 10623.5, 10621.3, ! -2.28027 10651, 10651.5, ! 0.414062 10656.6, 10655, ! -1.6582 10659.1, 10658.1, ! -1.03711 10664.8, 10663.1, ! -1.6582 10665.8, 10663.9, ! -1.86523 10698.8, 10697.3, ! -1.45117 10700.2, 10699.6, ! -0.62207 10702.1, 10701.1, ! -1.03613 10727.5, 10726.4, ! -1.03613 10729.5, 10728.5, ! -1.03613 • u 10736.6, 10733.5, ! -3.10938 10737.6, 10734.7, ! -2.90234 10740.3, 10736.1, ! -4.14648 10745, 10741.1, ! -3.93848 10746.1, 10792.4, ! -3.73145 10749.4, 10745.7, ! -3.73145 10867.1, 10869.4, ! 2.28027 10868.7, 10870.4, ! 1.6582 10870.8, 10872.7, ! 1.86621 10875.8, 10876, ! 0.207031 10882.3, 10879.8, ! -2.4873 10884.4, 10882.7, ! -1.65918 10886.3, 10885.1, ! -1.24414 10887.9, 10885.8, ! -2.07227 10890.3, 10887.8, ! -2.4873 10892.5, 10890.3, ! -2.28027 10894.4, 10892.3, ! -2.07324 10895.8, 10893.7, ! -2.07324 10897.2, 10895.4, ! -1.86523 10899.9, 10898.3, ! -1.6582 10903, 10900.3, ! -2.69434 10904, 10902, ! -2.07324 10906.8, 10904.3, ! -2.4873 10911.7, 10908.4, ! -3.31641 10921.6, 10919.9, ! -1.6582 10973.5, 10970.4, ! -3.10938 11003, 11001.5, ! -1.45117 11023.1, 11019.4, ! -3.73145 11026, 11022.1, ! -3.93848 11032.6, 11030, ! -2.69434 11033.1, 11030.8, ! -2.28027 11034.9, 11032.2, ! -2.69434 11036.2, 11034.1, ! -2.07324 11038.5, 11035.6, ! -2.90234 11039.9, 11036.4, ! -3.52441 11041.6, 11038, ! -3.52441 11042.8, 11039.3, ! -3.52441 11044.5, 11041.1, ! -3.31738 11045.7, 11042.2, ! -3.52441 11047.4, 11044.1, ! -3.31738 11049, 11046.3, ! -2.69531 11051.1, 11049.9, ! -1.24414 11054.8, 11053.2, ! -1.65918 11056.7, 11056.3, ! -0.415039 11082.6, 11081.4, ! -1.24414 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 283 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 • 1024 • • *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 2 18B_PB1_5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 02-18B PBl APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** iiiilliiiiiiiiiiiii Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Schlumberger MCNL dated 08-Jun-2007 *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ------------------ CNAM -- - ODEP GR GR --- ----- GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 124 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 • • Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 137 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes ~ • Tape Subfile 1 is type: LIS • • Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 38.7242 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.2676 1.1466 0.1836 0.1836 10100.0000 80.0095 23.3700 2179.3999 6064.5400 130.8446 87.6463 10200.0000 24.8524 14.5000 2179.3999 1229.6970 122.3204 117.7200 10300.0000 38.6680 50.1626 2179.3999 6064.5400 276.0020 173.2809 10400.0000 28.9297 59.9231 2179.3999 187.9814 97.7166 103.5627 10500.0000 43.4530 76.9797 2179.3999 6064.5400 378.7450 227.5939 10600.0000 25.6403 26.8967 2179.3999 6064.5400 72.0869 54.4361 10700.0000 32.8307 56.3779 2179.3999 6064.5400 309.9522 246.0531 10800.0000 41.4817 79.2888 2179.3999 6064.5400 201.9380 164.7540 10900.0000 153.9683 46.7071 2179.3999 6064.5400 231.7055 401.5262 11000.0000 49.1932 118.0920 2179.3999 6064.5400 117.8310 94.3466 11100.0000 33.9602 59.2014 2179.3999 6064.5400 339.1860 218.2137 11200.0000 102.2633 95.0070 2179.3999 6064.5400 165.5625 118.1492 11300.0000 74.8256 94.1803 2179.3999 6064.5400 112.7200 91.4560 11400.0000 65.4605 102.2199 2179.3999 6064.5400 116.1216 91.4560 11500.0000 74.6791 66.7396 2179.3999 6064.5400 • 97.9722 88.4580 11600.0000 60.6598 72.8041 72.2130 75.7160 11700.0000 147.6006 61.4998 18.5987 14.5826 11800.0000 68.7404 52.2631 34.6390 46.2846 11900.0000 -999.2500 61.1598 -999.2500 -999.2500 11917.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet ~ 2179.3999 2179.3999 68.6792 -999.2500 -999.2500 156.9263 28.7964 33.3581 -999.2500 -999.2500 ~ ~. **** REEL HEADER **** MWD 08/05/14 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 07/06/08 1442140 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!~!!!!!! Extract File: ldwg.las ~Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame ~Well Information Block #MNEM.UNIT Data Type Information #--------- ------------- ------------------------------- STRT.FT 9696.0000: Starting Depth STOP.FT 12205.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 02-18B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 16' 16.520"N 148 deg 29' 0.619"W 95' FNL, 764' FEL CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 07-Jun-07 API . API NUMBER: 500292045402 ~Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 36 . TOWN.N T11N . RANG. R14E . PDAT. MSL . EPD .F 0 . LMF . RF . FAPD.F 64 . DMF . RF . EKB .F 0 . EDF .F 64 . EGL .F 0 . CASE.F N/A . OS1 . DIRECTIONAL . ~Remarks ~(0~<`6~° Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ~ /(o~~$ ~ ~ (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) Al1 True Vertical Depths (TVDSS) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer pownhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Schlumberger MCNL dated 8-Jun-2007 per Douglas Dortch with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 02-18 through a milled window in 4.5" liner. Top of window 10010 ft.MD (8525.0 ft.TVDSS) Bottom of window 10019 ft.MD (8533.0 ft.TVDSS) (9) The openhole sidetrack was milled off a whipstock set at 11075'MD/8774'TVDSS. (10) Tied to D2-18 at 9752 ft.MD (8296 ft.TVDSS) (11) The interval from 12144 to 12205 ft.MD (8766 ft to 8770 ft.TVDSS) was not logged due to sensor bit offset at TD.. MNEMONICS: GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-API units) ROPA -> Rate of Penetration, feet/hour RACLX -> Compensated Attenuation Resistivity Borehole Corrected (LS) [MWD](400kHz),Ohm-m RACHX -> Compensated Attenuation Resistivity Borehole Corrected (LS) [MWD](2MHz),Ohm-m RPCLX -> Compensated Phase Difference Resistivity Borehole Corrected (LS)[MWD](400kHz),Ohm-m RPCHX -> Compensated Phase Difference Resistivity Borehole Corrected (LS)[MWD](2MHz),Ohm-m TVD -> Subsea True Vertical Depth, feet CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9705.05, 9704.22, ! -0.830078 9705.47, 9705.47, ! 0 9708.16, 9708.37, ! 0.207031 9711.62, 9711.62, ! 0 9713.7, 9713.91, ! 0.207031 9715.15, 9715.56, ! 0.414062 9718.05, 9718.05, ! 0 9720.02, 9719.6, ! -0.415039 9723.03, 9724.27, ! 1.24414 9725.72, 9728.21, ! 2.4873 9735.46, 9732.77, ! -2.69434 9740.44, 9739.4, ! -1.03711 9742.3, 9741.06, ! -1.24316 9744.38, 9743.96, ! -0.415039 9748.94, 9748.73, ! -0.207031 9750.45, 9750.66, ! 0.207031 9754.39, 9754.8, ! 0.415039 9755.42, 9756.25, ! 0.830078 10017.4, 10016.2, ! -1.24316 10017.8, 10016.4, ! -1.45117 10018.9, 10017.8, ! -1.03613 10020.3, 10019.1, ! -1.24414 10024.1, 10022.9, ! -1.24414 10026.4, 10025.4, ! -1.03711 10043.2, 10047.8, ! 4.56055 10045.9, 10050.5, ! 4.56055 ~ 10062.4, 10060.2, ! -2.28027 10063.5, 10062.2, ! -1.24414 10065.3, 10064.5, ! -0.829102 10067.6, 10066.4, ! -1.24316 10069.9, 10068, ! -1.86523 10071.6, 10070.9, ! -0.62207 10074.5, 10073, ! -1.45117 10075.7, 10075, ! -0.62207 10078.1, 10077.5, ! -0.62207 10079.8, 10078.8, ! -1.03613 10082.1, 10082.9, ! 0.829102 10084.4, 10085, ! 0.62207 10090.8, 10089, ! -1.86621 10093.9, 10092.2, ! -1.6582 10095.4, 10094.2, ! -1.24414 10101.4, 10098.9, ! -2.4873 10102, 10100.3, ! -1.6582 10102.4, 10101.6, ! -0.829102 10104.5, 10105.7, ! 1.24414 10111.7, 10110.7, ! -1.03711 10113, 10112.3, ! -0.621094 10114.2, 10113.4, ! -0.829102 10115.2, 10116.1, ! 0.830078 10117.3, 10118.4, ! 1.03711 10121.3, 10119.4, ! -1.86523 10123.7, 10121.5, ! -2.28027 10124.4, 10123.5, ! -0.829102 10126.9, 10126.4, ! -0.415039 10130.8, 10129.8, ! -1.03711 10133.8, 10133, ! -0.830078 10139.4, 10137.7, ! -1.65918 10141, 10139.6, ! -1.45117 10142.1, 10140.4, ! -1.6582 10152.6, 10150.3, ! -2.28027 10153.5, 10151, ! -2.4873 10154.7, 10153.4, ! -1.24414 10155.6, 10154.5, ! -1.03711 10163, 10161.8, ! -1.24414 10166.1, 10164.7, ! -1.45117 10170.1, 10168.2, ! -1.86621 10171.3, 10169.6, ! -1.6582 10171.7, 10170.5, ! -1.24414 10174.2, 10173.1, ! -1.03613 10174.8, 10174.2, ! -0.62207 10190, 10188.5, ! -1.45117 10192.9, 10191.8, ! -1.03613 10194.4, 10194, ! -0.414062 10198.1, 10197.3, ! -0.829102 10203.2, 10200.3, ! -2.90234 10206, 10204.2, ! -1.86523 10207, 10205.1, ! -1.86621 10208.9, 10206.6, ! -2.28027 10224.3, 10224.5, ! 0.207031 10226.8, 10226.8, ! 0 10232.6, 10231.1, ! -1.45117 10235, 10233.3, ! -1.6582 10235.6, 10233.9, ! -1.6582 10236.5, 10234.6, ! -1.86523 10238.3, 10236.4, ! -1.86523 10240.9, 10240.3, ! -0.621094 10244, 10243, ! -1.03613 10252.8, 10250.7, ! -2.07324 10254.7, 10252.2, ! -2.48828 10255.9, 10254.1, ! -1.86523 10259.4, 10257, ! -2.4873 10262.1, 10263.8, ! 1.65918 10273.4, 10271.8, ! -1.6582 ~ ~ 10274.7, 10273.2, 10276.9, 10275.2, 10279.8, 10277.9, 10281, 10279.5, 10282.7, 10281.4, 10292.4, 10290.5, 10295.5, 10293.4, 10297, 10294.8, 10297.9, 10297.3, 10308.2, 10306.3, 10310.8, 10310.2, 10314.4, 10313.4, 10366.9, 10361.3, 10369.4, 10363.4, 10396, 10392.7, 10398.3, 10395.2, 10400.2, 10396.9, 10405.8, 10402.6, 10410.5, 10406.5, 10412.2, 10407.8, 10418.6, 10416.3, 10422.5, 10420.4, 10426, 10422.9, 10427.9, 10425.2, 10430, 10427.5, 10433.3, 10431, 10438.5, 10434.3, 10443.9, 10438.9, 10446.3, 10444.9, 10454, 10452.4, 10456.7, 10455.3, 10466, 10461.3, 10469.8, 10466.7, 10477.6, 10475.4, 10481.2, 10478.7, 10496.9, 10494, 10501.5, 10501.1, 10503.8, 10504.4, 10520.6, 10518.2, 10523.3, 10520.6, 10526.5, 10522.9, 10529.1, 10525.2, 10531, 10526,7, 10533, 10528.7, 10535.5, 10532.6, 10537.7, 10535.2, 10539.6, 10538.2, 10543.4, 10542.4, 10546.7, 10545.5, 10551.8, 10548.7, 10554.3, 10552.4, 10557.5, 10555, 10562.7, 10558.9, 10586.2, 10580.8, 10587.5, 10581.9, 10588.3, 10582.9, 10620.2, 10617.9, 10622.4, 10619.9, 10623.5, 10621.3, 10651, 10651.5, 10656.6, 10655, 10659.1, 10658.1, 10664.8, 10663.1, 10665.8, 10663.9, 10698.8, 10697.3, 10700.2, 10699.6, 10702.1, 10701.1, -1.45117 -1.6582 -1.86523 -1.45117 -1.24414 -1.86621 -2.07324 -2.28027 -0.62207 -1.86621 -0.62207 -1.03613 -5.59766 -6.01172 -3.31641 -3.10938 -3.31738 -3.10938 -3.93848 -4.35254 -2.28027 -2.07324 -3.10938 -2.69531 -2.4873 -2.28027 -4.14648 -4.97559 -1.45117 -1.6582 -1.45117 -4.76758 -3.10938 -2.2793 -2.4873 -2.90234 -0.415039 0.621094 -2.4873 -2.69531 -3.52441 -3.93848 -4.35352 -4.35352 -2.90137 -2.4873 -1.45117 -1.03711 -1.24414 -3.10938 -1.86523 -2.4873 -3.73145 -5.38965 -5.59668 -5.38965 -2.28027 -2.4873 -2.28027 0.414062 -1.6582 -1.03711 -1.6582 -1.86523 -1.45117 -0.62207 -1.03613 ~ ~ 10727.5, 10726.4, 10729.5, 10728.5, 10736.6, 10733.5, 10737.6, 10734.7, 10740.3, 10736.1, 10745, 10741.1, 10746.1, 10742.4, 10749.4, 10745.7, 10867.1, 10869.4, 10868.7, 10870.4, 10870.8, 10872.7, 10875.8, 10876, 10882.3, 10879.8, 10884.4, 10882.7, 10886.3, 10885.1, 10887.9, 10885.8, 10890.3, 10887.8, 10892.5, 10890.3, 10894.4, 10892.3, 10895.8, 10893.7, 10897.2, 10895.4, 10899.9, 10898.3, 10903, 10900.3, 10904, 10902, 10906.8, 10904.3, 10911.7, 10908.4, 10921.6, 10919.9, 10973.5, 10970.4, 11003, 11001.5, 11023.1, 11019.4, 11026, 11022.1, 11032.6, 11030, 11033.1, 11030.8, 11034.9, 11032.2, 11036.2, 11034.1, 11038.5, 11035.6, 11039.9, 11036.4, 11041.6, 11038, 11042.8, 11039.3, 11044.5, 11041.1, 11045.7, 11042.2, 11047.4, 11044.1, 11049, 11046.3, 11051.1, 11049.9, 11054.8, 11053.2, 11056.7, 11056,3, 11082.6, 11081,4, 11084.9, 11084,1, 11113.1, 11110, 11125.8, 11122,5, 11128.3, 11125.2, 11147.8, 11143.2, 11150.7, 11146.5, 11152.6, 11147.8, 11153.6, 11150.3, 11155.2, 11152.5, 11157.3, 11156.1, 11160, 11157.1, 11161.7, 11159.6, 11163.7, 11160.6, 11168.9, 11164.1, 11171.8, 11167.9, 11175, 11173.3, 11178.1, 11175.8, 11179.9, 11177.2, 11182.8, 11179.9, 11186, 11183.3, -1.03613 -1.03613 -3.10938 -2.90234 -4.14648 -3.93848 -3.73145 -3.73145 2.28027 1.6582 1.86621 0.207031 -2.4873 -1.65918 -1.24414 -2.07227 -2.4873 -2.28027 -2.07324 -2.07324 -1.86523 -1.6582 -2.69434 -2.07324 -2.4873 -3.31641 -1.6582 -3.10938 -1.45117 -3.73145 -3.93848 -2.69434 -2.28027 -2.69434 -2.07324 -2.90234 -3.52441 -3.52441 -3.52441 -3.31738 -3.52441 -3.31738 -2.69531 -1.24414 -1.65918 -0.415039 -1.24414 -0.829102 -3.10938 -3.31641 -3.10938 -4.56055 -4.14551 -4.76855 -3.31641 -2.69434 -1.24414 -2.90137 -2.07227 -3.10938 -4.76758 -3.93848 -1.6582 -2.28027 -2.69434 -2.90137 -2.69434 ~ ~ 11191.1, 11187, 11194.5, 11191.8, 11200.6, 11197.1, 11201.5, 11197.9, 11203, 11198.9, 11203.9, 11200, 11205.5, 11201.8, 11206.8, 11202.8, 11207.9, 11204.6, 11211.8, 11207, 11216.4, 11210.6, 11219.5, 11213.5, 11227.3, 11219, 11229.4, 11220.9, 11233.5, 11226, 11234,8, 11228, 11236,5, 11230.9, 11238.2, 11231.8, 11243.4, 11237.4, 11255.7, 11250.3, 11256.4, 11251.5, 11260, 11257.7, 11266.6, 11261.7, 11273,8, 11264.7, 11278,7, 11273.3, 11281,8, 11275.3, 11289, 11281.6, 11296.7, 11286.5, 11299.2, 11291.7, 11300, 11293.8, 11304.4, 11297.7, 11305.8, 11298.8, 11319.3, 11310, 11328.6, 11320.9, 11330.1, 11322.4, 11331.9, 11324.3, 11333.4, 11326.5, 11336.3, 11329.6, 11338.6, 11332.1, 11340, 11334.8, 11343.3, 11337.5, 11370, 11367.3, 11372.5, 11370, 11377.5, 11372.1, 11381.6, 11373.3, 11385.3, 11376.2, 11390.1, 11377.5, 11393.2, 11381.2, 11395.6, 11387.3, 11397, 11387.8, 11402.1, 11394.5, 11405.2, 11398.6, 11406.9, 11401.3, 11408.4, 11403.8, 11409.8, 11405.9, 11412.1, 11409, 11416.2, 11412.3, 11422.6, 11413.7, 11428.2, 11417.8, 11430.9, 11419.9, 11434.3, 11425.2, 11441.6, 11437.9, 11446.4, 11443.5, 11448.2, 11445.5, 11481.9, 11482.8, 11485.9, 11486.7, 11490, 11488.2, ! -4.14551 ! -2.69434 ! -3.52344 ! -3.52344 ! -4.14551 ! -3.93848 ! -3.73145 ! -3.93848 ! -3.31641 ! -4.76758 ! -5.80469 ! -6.01172 ! -8.29199 ! -8.49902 ! -7.46289 ! -6.84082 ! -5.59668 ! -6.42578 ! -6.01172 ! -5.38965 ! -4.97559 ! -2.28027 ! -4.97461 ! -9.12109 ! -5.38965 ! -6.42676 ! -7.46289 ! -10.1572 ! -7.46191 ! -6.21973 ! -6.63281 ! -7.04785 ! -9.32812 ! -7.66992 ! -7.66992 ! -7.66992 ! -6.84082 ! -6.63379 ! -6.42578 ! -5.18262 ! -5.80371 ! -2.69434 ! -2.4873 ! -5.38965 ! -8.29199 ! -9.12109 ! -12.6455 ! -12.0234 ! -8.29199 ! -9.12109 ! -7.66992 ! -6.63379 ! -5.59668 ! -4.56055 ! -3.93945 ! -3.10938 ! -3.93848 ! -8.91406 ! -10.3643 ! -10.9863 ! -9.12109 ! -3.73145 ! -2.90234 ! -2.69434 ! 0.829102 ! 0.829102 ! -1.86523 ~ ~ 11493.5, 11490, ! -3.52441 11496.5, 11493.4, ! -3.10938 11497.9, 11494.6, ! -3.31641 11499, 1 1495.6, ! -3.31641 11501, 1 1497.7, ! -3.31641 11503.1, 11501.7, ! -1.45117 11512.9, 11506.2, ! -6.63281 11514.4, 11509.6, ! -4.76758 11517, 1 1511.8, ! -5.18262 11518.7, 11515.4, ! -3.31738 11520, 1 1518.3, ! -1.6582 11524.1, 11519.8, ! -4.35352 11526.4, 11525.2, ! -1.24414 11527.6, 11527.2, ! -0.414062 11531.8, 11528.3, ! -3.52441 11536.3, 11533.8, ! -2.4873 11538.6, 11535.7, ! -2.90137 11541.9, 11540.4, ! -1.45117 11546, 11543.1, ! -2.90234 11548.2, 11546.4, ! -1.86523 11552.4, 11550.9, ! -1.45117 11560.7, 11555.1, ! -5.59766 11566.1, 11562.1, ! -3.93848 11568.1, 11565, ! -3.10938 11570.5, 11567.6, ! -2.90234 11573.2, 11572.2, ! -1.03711 11577, 11577.6, ! 0.621094 11595.8, 11592.7, ! -3.10938 11597.7, 11595.4, ! -2.28027 11600.6, 11598.1, ! -2.4873 11615.1, 11609.1, ! -6.01074 11617.8, 11612.4, ! -5.38965 11622.8, 11619, ! -3.73047 11625.2, 11621.9, ! -3.31738 11649.7, 11646.8, ! -2.90234 11653.5, 11649.9, ! -3.52441 11663.2, 11659.5, ! -3.73145 11670, 11664, ! -6.01172 11689.7, 11685.1, ! -4.56055 11693.3, 11690.4, ! -2.90234 11723.3, 11723.9, ! 0.62207 11737.6, 11733.7, ! -3.93945 11747.4, 11741.8, ! -5.59668 11892, 11890.2, ! -1.86523 11894.1, 11892.3, ! -1.86621 11895.2, 11894.1, ! -1.03613 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 416 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 ~ 1024 ~ ~ *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 2-18B 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 02-18B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!~!~~!!!~!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Schlumberger MCNL dated 08-Jun-2007 per pouglas Dortch with BP Exploration (A *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 140 Tape File Start Depth = 9696.000000 ~ Tape File End Depth = 12205.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 153 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 2-18B.xtf LCC 150 CN BP Exploration (Alaska) WN 02-18B APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 ~ F12AME SPACE = 0.250 * F n ~ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves; Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 279 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 9696.000000 Tape File End Depth = 12204.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 292 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 07/06/08 1442140 01 **** REEL TRAILER **** MWD 08/05/14 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~ ~ ~ Tape Subfile 1 is type: LIS • ~ Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.5000 41.8839 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 57.7645 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.2057 39.6204 0.1644 0.1927 10100.0000 87.3862 24.9067 2179.3999 6064.5400 130.8446 87.6463 10200.0000 24.3762 14.6000 2179.3999 1223.5251 120.2203 115.3875 10300.0000 37.4756 51.2986 2179.3999 6064.5400 276.0020 173.2809 10400.0000 28.9280 57.6179 2179.3999 187.9814 97.7166 103.5627 10500.0000 42.0876 77.3620 2179.3999 6064.5400 378.7450 227.5939 10600.0000 24.2218 25.3414 2179.3999 6064.5400 75.6604 57.2348 10700.0000 32.6568 69.6430 2179.3999 6064.5400 305.2670 246.0531 10800.0000 39.3117 79.3756 2179.3999 6064.5400 201.9380 164.7540 10900.0000 154.4704 46.8141 2179.3999 6064.5400 231.7055 401.5262 11000.0000 49.4160 118.4846 2179.3999 6064.5400 117.8310 94.3466 11100.0000 32.4126 77.8247 2179.3999 6064.5400 95.8776 85.5630 11200.0000 118.1855 136.3188 2179.3999 130.1460 108.6510 141.5942 11300.0000 41.8493 41.3000 2179.3999 163.5404 45.5605 89.1983 11400.0000 180.9214 30.7639 2179.3999 6064.5400 72.6123 7188.8896 11500.0000 164.9694 34.3386 2179.3999 52.6025 ~ 49.7090 22.4579 11600.0000 78.9161 43.3861 123.2500 113.7290 11700.0000 69.8974 93.720i 105.0446 93.8850 11800.0000 67.8839 96.851~ 107.5574 94.5410 11900.0000 63.5592 80.640E 98.6850 90.1800 12000.0000 66.5639 44.7201 100.4890 95.0070 12100.0000 52.4301 111.0195 74.5350 80.6860 12200.0000 -999.2500 53.3484 -999.2500 -999.2500 12205.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 12205.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 -999.2500 -999.2500 6064.5400 6064.5400 6064.5400 6064.5400 6064.5400 180.0870 -999.2500 -999.2500 . • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 36.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.1670 3038.9370 0.2180 0.2160 10100.0000 27.0000 38.7000 2179.3999 6064.5400 154.8030 111.9740 10200.0000 16.4000 24.3000 2179.3999 6064.5400 208.7090 171.6360 10300.0000 42.4000 72.0000 2179.3999 6064.5400 276.0020 166.6300 10400.0000 28.1000 50.2000 2179.3999 580.6300 121.0300 127.2140 10500.0000 42.3000 78.2000 2179.3999 6064.5400 378.7450 234.5090 10600.0000 23.2000 33.0000 2179.3999 6064.5400 141.9550 109.7880 10700.0000 31.8000 88.5000 2179.3999 6064.5400 386.8680 334.7150 10800.0000 38.3000 77.7000 2179.3999 6064.5400 216.8350 164.7540 10900.0000 172.0000 56.6000 2179.3999 6064.5400 139.7300 137.7780 11000.0000 47.4000 95.5000 2179.3999 6064.5400 123.1120 98.2280 11100.0000 28.2000 93.1000 2179.3999 6064.5400 201.2620 155.4790 11200.0000 112.3000 142.9000 2179.3999 147.3070 104.4740 147.9480 11300.0000 139.9000 55.8000 2179.3999 77.4010 24.9860 76.7840 11400.0000 159.3000 26.0000 2179.3999 128.9650 55.9220 327.5230 11500.0000 170.2000 79.3000 2179.3999 56.1640 • 139.1540 29.8540 11600.0000 74.7000 112.8000 128.9520 109.3690 11700.0000 76.6000 90.0000 104.4740 91.3730 11800.0000 66.5000 94.2000 108.6510 94.5410 11900.0000 62.1000 81.9000 98.6850 90.1800 12000.0000 64.0000 44.2000 100.4890 95.0070 12100.0000 57.1000 103.0000 74.5350 78.2650 12200.0000 -999.2500 48.9000 -999.2500 -999.2500 12204.7500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 12204.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 2179.3999 -999.2500 -999.2500 6064.5400 6064.5400 6064.5400 6064.5400 6064.5400 186.4800 -999.2500 -999.2500 ~ ~ Tape Subfile 4 is type: LIS ~ ~ **** REEL HEADER **** MWD 08/05/15 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD O1/06/08 1442140 01 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las ~Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame ~Well Information Block #MNEM.UNIT Data Type Information #--------- - ------- ------------------------------- STRT.FT 9696.0000: Starting Depth STOP.FT 11917.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 02-18BPB1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 16' 16.520"N 148 deg 29' 0.619"W 95' FNL, 764' FEL CNTY. COUNTY: North Slope STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3.0" CTK DATE. LOG DATE: 01-Jun-07 API . API NUMBER: 5002904540273 ~Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 36 . TOWN.N T11N . RANG. R14E . PDAT. MSL . EPD .F 0 . LMF . RF . FAPD.F 64 . DMF . RF . EKB .F 0 . EDF .F 64 . EGL .F 0 . CASE.F N/A . OS1 . DIRECTIONAL . ~Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ~ -~~ (o '~/(oa ~ ~ ~ (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulatinq Sub, a Drilling Performance Sub (Inner and Outer pownhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Schlumberger MCNL dated 8-Jun-2007 per Douglas Dortch with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 02-18 through a milled window in 4.5" liner. Top of window 10010 ft.MD (8525.0 ft.TVDSS) Bottom of window 10019 ft.MD (8533.0 ft.TVDSS) (9) Tied to 02-18 at 9752 ft.MD (8295.96 ft.TVDSS) (10) Multiple Propagation Resistivity data is presented only to display curve response. The numerical values are suspect and should be considered inaccurate. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) ( 4 0 0 kH z), OYun-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) ( 2MHz ) , Otun-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9705.05, 9704.22, ! -0.830078 9705.47, 9705.47, ! 0 9708.16, 9708.37, ! 0.207031 9711.62, 9711.62, ! 0 9713.7, 9713.91, ! 0.207031 9715.15, 9715.56, ! 0.414062 9718.05, 9718.05, ! 0 9720.02, 9719.6, ! -0.415039 9723.03, 9724.27, ! 1.24414 9725.72, 9728.21, ! 2.4873 9735.46, 9732.77, ! -2.69434 9740.44, 9739.4, ! -1.03711 9742.3, 9741.06, ! -1.24316 9744.38, 9743.96, ! -0.415039 9748.94, 9748.73, ! -0.207031 9750.45, 9750.66, ! 0.207031 9754.39, 9754.8, ! 0.415039 9755.42, 9756.25, ! 0.830078 10017.4, 10016.2, ! -1.24316 10017.8, 10016.4, ! -1.45117 10018.9, 10017.8, ! -1.03613 10020.3, 10019.1, ! -1.24414 10024.1, 10022.9, ! -1.24414 10026.4, 10025.4, ! -1.03711 10043.2, 10047.8, ! 4.56055 10045.9, 10050.5, ! 4.56055 10062.4, 10060.2, ! -2.28027 ~ 10063.5, 10062.2, 10065.3, 10064.5, 10067.6, 10066.4, 10069.9, 10068, 10071.6, 10070.9, 10074.5, 10073, 10075.7, 10075, 10078.1, 10077.5, 10079.8, 10078.8, 10082.1, 10082.9, 10084.4, 10085, 10090.8, 10089, 10093.9, 10092.2, 10095.4, 10094.2, 10101.4, 10098.9, 10102, 10100.3, 10102.4, 10101.6, 10104.5, 10105.7, 10111.7, 10110.7, 10113, 10112.3, 10114.2, 10113.4, 10115.2, 10116.1, 10117.3, 10118.4, 10121.3, 10119.4, 10123.7, 10121.5, 10124.4, 10123.5, 10126.9, 10126.4, 10130.8, 10129.8, 10133.8, 10133, 10139.4, 10137.7, 10141, 10139.6, 10142.1, 10140.4, 10152.6, 10150.3, 10153.5, 10151, 10154.7, 10153.4, 10155.6, 10154.5, 10163, 10161.8, 10166.1, 10164.7, 10170.1, 10168.2, 10171.3, 10169.6, 10171.7, 10170.5, 10174.2, 10173.1, 10174.8, 10174.2, 10190, 10188.5, 10192.9, 10191.8, 10194.4, 10194, 10198.1, 10197.3, 10203.2, 10200.3, 10206, 10204.2, 10207, 10205.1, 10208.9, 10206.6, 10224.3, 10224.5, 10226.8, 10226.8, 10232.6, 10231.1, 10235, 10233.3, 10235.6, 10233.9, 10236.5, 10234.6, 10238.3, 10236.4, 10240.9, 10240.3, 10244, 10243, ! 10252.8, 10250.7, 10254.7, 10252.2, 10255.9, 10254.1, 10259.4, 10257, 10262.1, 10263.8, 10273.4, 10271.8, 10274.7, 10273.2, ! -1.24414 ! -0.829102 ! -1.24316 ! -1.86523 ! -0.62207 ! -1.45117 ! -0.62207 ! -0.62207 ! -1.03613 ! 0.829102 ! 0.62207 ! -1.86621 ! -1.6582 ! -1.24414 ! -2.4873 ! -1.6582 ! -0.829102 ! 1.24414 ! -1.03711 ! -0.621094 ! -0.829102 ! 0.830078 ! 1.03711 ! -1.86523 ! -2.28027 ! -0.829102 ! -0.415039 ! -1.03711 ! -0.830078 ! -1.65918 ! -1.45117 ! -1.6582 ! -2.28027 ! -2.4873 ! -1.24414 ! -1.03711 ! -1.24414 ! -1.45117 ! -1.86621 ! -1.6582 ! -1.24414 ! -1.03613 ! -0.62207 ! -1.45117 ! -1.03613 ! -0.414062 ! -0.829102 ! -2.90234 ! -1.86523 ! -1.86621 ! -2.28027 ! 0.207031 I Q ! -1.45117 ! -1.6582 ! -1.6582 ! -1.86523 ! -1.86523 ! -0.621094 -1.03613 ! -2.07324 ! -2.48828 ! -1.86523 ! -2.4873 ! 1.65918 ! -1.6582 ! -1.45117 ~1 ~ 10276.9, 10275.2, 10279.8, 10277.9, 10281, 10279.5, 10282.7, 10281.4, 10292.4, 10290.5, 10295.5, 10293.4, 10297, 10294.8, 10297.9, 10297.3, 10308.2, 10306.3, 10310.8, 10310.2, 10314.4, 10313.4, 10366.9, 10361.3, 10369.4, 10363.4, 10396, 10392.7, 10398.3, 10395.2, 10400.2, 10396.9, 10405.8, 10402.6, 10410.5, 10406.5, 10412.2, 10407.8, 10418.6, 10416.3, 10422.5, 10420.4, 10426, 10422.9, 10427.9, 10425.2, 10430, 10427.5, 10433.3, 10431, 10438.5, 10434.3, 10443.9, 10438.9, 10446.3, 10444.9, 10454, 10452.4, 10456.7, 10455.3, 10466, 10461.3, 10469.8, 10466.7, 10477.6, 10475.4, 10481.2, 10478.7, 10496.9, 10494, 10501.5, 10501.1, 10503.8, 10504.4, 10520.6, 10518.2, 10523.3, 10520.6, 10526.5, 10522.9, 10529.1, 10525.2, 10531, 10526.7, 10533, 10528.7, 10535.5, 10532.6, 10537.7, 10535.2, 10539.6, 10538.2, 10593.4, 10542.4, 10546.7, 10545.5, 10551.8, 10548.7, 10554.3, 10552.4, 10557.5, 10555, 10562.7, 10558.9, 10586.2, 10580.8, 10587.5, 10581.9, 10588.3, 10582.9, 10620.2, 10617.9, 10622.4, 10619.9, 10623.5, 10621.3, 10651, 10651.5, 10656.6, 10655, 10659.1, 10658.1, 10664.8, 10663.1, 10665.8, 10663.9, 10698.8, 10697.3, 10700.2, 10699.6, 10702.1, 10701.1, 10727.5, 10726.4, -1.6582 -1.86523 -1.45117 -1.24414 -1.86621 -2.07324 -2.28027 -0.62207 -1.86621 -0.62207 -1.03613 -5.59766 -6.01172 -3.31641 -3.10938 -3.31738 -3.10938 -3.93848 -4.35254 -2.28027 -2.07324 -3.10938 -2.69531 -2.4873 -2.28027 -4.14648 -4.97559 -1.45117 -1.6582 -1.45117 -4.76758 -3.10938 -2.2793 -2.4873 -2.90234 -0.415039 0.621094 -2.4873 -2.69531 -3.52441 -3.93848 -4.35352 -4.35352 -2.90137 -2.4873 -1.45117 -1.03711 -1.24414 -3.10938 -1.86523 -2.4873 -3.73145 -5.38965 -5.59668 -5.38965 -2.28027 -2.4873 -2.28027 0.414062 -1.6582 -1.03711 -1.6582 -1.86523 -1.45117 -0.62207 -1.03613 -1.03613 ~ I~ ~ 10729.5, 10728.5, ! -1.03613 10736.6, 10733.5, ! -3.10938 10737.6, 10734.7, ! -2.90234 10740.3, 10736.1, ! -4.14648 10745, 10741.1, ! -3.93848 10746.1, 10742.4, ! -3.73145 10749.4, 10745.7, ! -3.73145 10867.1, 10869.4, ! 2.28027 10868.7, 10870.4, ! 1.6582 10870.8, 10872.7, ! 1.86621 10875.8, 10876, ! 0.207031 10882.3, 10879.8, ! -2.4873 10884.4, 10882.7, ! -1.65918 10886.3, 10885.1, ! -1.24414 10887.9, 10885.8, ! -2.07227 10890.3, 10887.8, ! -2.4873 10892.5, 10890.3, ! -2.28027 10894.4, 10892.3, ! -2.07324 10895.8, 10893.7, ! -2.07324 10897.2, 10895.4, ! -1.86523 10899.9, 10898.3, ! -1.6582 10903, 10900.3, ! -2.69434 10904, 10902, ! -2.07324 10906.8, 10904.3, ! -2.4873 10911.7, 10908.4, ! -3.31641 10921.6, 10919.9, ! -1.6582 10973.5, 10970.4, ! -3.10938 11003, 11001.5, ! -1.45117 11023.1, 11019.4, ! -3.73145 11026, 11022.1, ! -3.93848 11032.6, 11030, ! -2.69434 11033.1, 11030.8, ! -2.28027 11034.9, 11032.2, ! -2.69434 11036.2, 11034.1, ! -2.07324 11038.5, 11035.6, ! -2.90234 11039.9, 11036.4, ! -3.52441 11041.6, 11038, ! -3.52441 11042.8, 11039.3, ! -3.52441 11044.5, 11041.1, ! -3.31738 11045.7, 11042.2, ! -3.52441 11047.4, 11044.1, ! -3.31738 11049, 11046.3, ! -2.69531 11051.1, 11049.9, ! -1.24414 11054.8, 11053.2, ! -1.65918 11056.7, 11056.3, ! -0.415039 11082.6, 11081.4, ! -1.244I4 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 284 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 ~ 1024 ~ ~ *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 2-18B PB1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 02-18BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Schlumberger MCNL dated 08-Jun-2007 per pouglas Dortch with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM ---- CHAN DIMT ------------------- CNAM ----- ODEP GR GR ------ GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 124 Tape File Start Depth = 9696.000000 ~ ~ Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 137 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 02-18B PBl.xtf LCC 150 CN BP Exploration (Alaska) WN 02-18BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ------------------ CNAM ----- ODEP GR GR ------ GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ~ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 247 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 260 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 01/06/08 1442140 O1 **** REEL TRAILER **** MWD 08/05/15 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~~ ~ ~ Tape Subfile 1 is type: LIS ~ ~ Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 38.7242 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.2676 1.1466 0.1836 0.1836 10100.0000 80.0095 23.3700 2179.3999 6064.5400 130.8446 87.6463 10200.0000 24.8524 14.5000 2179.3999 1229.6970 122.3204 117.7200 10300.0000 38.6680 50.1626 2179.3999 6064.5400 276.0020 173.2809 10400.0000 28.9297 59.9231 2179.3999 187.9814 97.7166 103.5627 10500.0000 43.4530 76.9797 2179.3999 6064.5400 378.7450 227.5939 10600.0000 25.6403 26.8967 2179.3999 6064.5400 72.0869 54.4361 10700.0000 32.8307 56.3779 2179.3999 6064.5400 309.9522 246.0531 10800.0000 41.4817 79.2888 2179.3999 6064.5400 201.9380 164.7540 10900.0000 153.9683 46.7071 2179.3999 6064.5400 231.7Q55 401.5262 11000.0000 49.1932 118.0920 2179.3999 6064.5400 117.8310 94.3466 11100.0000 33.9602 59.2014 2179.3999 6064.5400 339.1860 218.2137 11200.0000 102.2633 95.0070 2179.3999 6064.5400 165.5625 118.1492 11300.0000 74.8256 94.1803 2179.3999 6064.5400 112.7200 91.4560 11400.0000 65.4605 102.2199 2179.3999 6064.5400 116.1216 91.4560 11500.0000 74.6791 66.7396 2179.3999 6064.5400 ~ 97.9722 88.4580 11600.0000 60.6598 72.8041 72.2130 75.7160 11700.0000 147.6006 61.4998 18.5987 14.5826 11800.0000 68.7404 52.2631 34.6390 46.2846 11900.0000 -999.2500 61.1598 -999.2500 -999.2500 11917.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet ~~ 2179.3999 2179.3999 68.6792 -999.2500 -999.2500 156.9263 28.7964 33.3581 -999.2500 -999.2500 ~ ~ Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 34.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.1670 3038.9370 0.2180 0.2160 10100.0000 26.9000 39.4000 2179.3999 6064.5400 154.8030 111.9740 10200.0000 16.1000 21.4000 2179.3999 6064.5400 208.7090 171.6360 10300.0000 42.3000 72.0000 2179.3999 6064.5400 276.0020 166.6300 10400.0000 27.9000 51.2000 2179.3999 580.6300 121.0300 127.2140 10500.0000 42.8000 78.4000 2179.3999 6064.5400 378.7450 234.5090 10600.0000 22.6000 34.6000 2179.3999 6064.5400 141.9550 109.7880 10700.0000 31.9000 88.3000 2179.3999 6064.5400 404.3720 333.8270 10800.0000 39.0000 78.1000 2179.3999 6064.5400 209.3870 164.7540 10900.0000 173.3000 54.5000 2179.3999 6064.5400 141.9550 141.7860 11000.0000 47.4000 95.5000 2179.3999 6064.5400 123.1120 98.2280 11100.0000 29.5000 99.4000 2179.3999 6064.5400 305.2670 208.0860 11200.0000 115.5000 64.3000 2179.3999 6064.5400 131.9790 100.0320 11300.0000 80.3000 98.0000 2179.3999 6064.5400 112.7200 88.4580 11400.0000 70.9000 104.3000 2179.3999 6064.5400 112.7200 88.4580 11500.0000 65.1000 112.3000 2179.3999 6064.5400 ~ 100.1500 91.4560 11600.0000 57.4000 75.6000 70.1900 73.5430 11700.0000 147.7000 62.5000 17.3920 12.9030 11800.0000 70.2000 46.000~ 35.3820 48.0930 11900.0000 -999.2500 42.1000 -999.2500 -999.2500 11917.0000 -999.2500 64.4000 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet ~ 2179.3999 2179.3999 ~7.1570 -999.2500 -999.2500 151.9410 31.3020 34.6490 -999.2500 -999.2500 ~ ~ Tape Subfile 4 is type: LIS ~ **** REEL HEADER **** MWD O8/11/18 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD O1/06/08 1442140 O1 3.0" CTK *** LIS COMMENT RECORD *** ~~i~iii~iiiii iiiiii Remar iiiiiiiiiiiii iiiiii Extra ~Version Info rmation VERS. 1.20: WRAP. NO: ~Well Informa tion Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9696.0000: STOP.FT 11917.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. STAT. SRVC. TOOL. DATE. API . ~Parameter #MNEM.UNIT #--------- SECT. TOWN.N RANG. PDAT. EPD .F LMF . FAPD.F DMF . EKB .F EDF .F EGL .F CASE.F OS1 . ~Remarks ~ k File Version 1.000 ct File: ldwg.las CWLS log ASCII Standard -VERSION 1.20 One line per frame Information COUNTY: STATE: SERVICE COMPANY: TOOL NAME & TYPE: LOG DATE: API NUMBER: Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. 02-18BPB1 Prudhoe Bay Unit 70 deg 16' 16.520"N 148 deg 29' 0.619"W 95' FNL, 764' FEL North Slope Alaska Baker Hughes INTEQ 3.0" CTK O1-Jun-07 500292045473 Information Block Value ------------------------- 36 . T11N . R14E . MSL . 0 . RF . 64 . RF . 0 . 64 . 0 . N/A . DIRECTIONAL . Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ~~-~~f~ ~ ~~a~~ ~ P~ ~ ~ (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are SubSea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer pownhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor and Ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth adjusted to PDCL (Primary Depth Control Log from Schlumberger MCNL dated 8-Jun-2007 per Douglas Dortch with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 02-18 through a milled window in 4.5" liner. Top of window 10010 ft.MD (8525.0 ft.TVDSS) Bottom of window 10019 ft.MD (8533.0 ft.TVDSS) (9) Tied to 02-18 at 9752 ft.MD (8295.96 ft.TVDSS) (10) Multiple Propagation Resistivity data is presented only to display curve response. The numerical values are suspect and should be considered inaccurate. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Compensated Resistivity Borehole Corrected(LS)(AT) (400kHz),Ohm-m RACHX -> Compensated Resistivity Borehole Corrected (LS)(AT) (2MHz),Ohm-m RPCLX -> Compensated Resistivity Borehole Corrected (LS)(PD) (400kHz),Ohm-m RPCHX -> Compensated Resistivity Borehole Corrected (LS)(PD) (2MHz),Ohm-m TVD -> Subsea True Vertical Depth CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9705.05, 9704.22, ! -0.830078 9705.47, 9705.47, ! 0 9708.16, 9708.37, ! 0.207031 9711.62, 9711.62, ! 0 9713.7, 9713.91, ! 0.207031 9715.15, 9715.56, ! 0.414062 9718.05, 9718.05, ! 0 9720.02, 9719.6, ! -0.415039 9723.03, 9724.27, ! 1.24414 9725.72, 9728.21, ! 2.4873 9735.46, 9732.77, ! -2.69434 9740.44, 9739.4, ! -1.03711 9742.3, 9741.06, ! -1.24316 9744.38, 9743.96, ! -0.415039 9748.94, 9748.73, ! -0.207031 9750.45, 9750.66, ! 0.207031 9754.39, 9754.8, ! 0.415039 9755.42, 9756.25, ! 0.830078 10017.4, 10016.2, ! -1.24316 10017.8, 10016.4, ! -1.45117 10018.9, 10017.8, ! -1.03613 10020.3, 10019.1, ! -1.24414 10024.1, 10022.9, ! -1.24414 10026.4, 10025.4, ! -1.03711 10043.2, 10047.8, ! 4.56055 10045.9, 10050.5, ! 4.56055 10062.4, 10060.2, ! -2.28027 . 10063.5, 10062.2, ! -1.24414 10065.3, 10064.5, ! -0.829102 10067.6, 10066.4, ! -1.24316 10069.9, 10068, ! -1.86523 10071.6, 10070.9, ! -0.62207 10074.5, 10073, ! -1.45117 10075.7, 10075, ! -0.62207 10078.1, 10077.5, ! -0.62207 10079.8, 10078.8, ! -1.03613 10082.1, 10082.9, ! 0.829102 10084.4, 10085, ! 0.62207 10090.8, 10089, ! -1.86621 10093.9, 10092.2, ! -1.6582 10095.4, 10094.2, ! -1.24414 10101.4, 10098.9, ! -2.4873 10102, 10100.3, ! -1.6582 10102.4, 10101.6, ! -0.829102 10104.5, 10105.7, ! 1.24414 10111.7, 10110.7, ! -1.03711 10113, 10112.3, ! -0.621094 10114.2, 10113.4, ! -0.829102 10115.2, 10116.1, ! 0.830078 10117.3, 10118.4, ! 1.03711 10121.3, 10119.4, ! -1.86523 10123.7, 10121.5, ! -2.28027 10124.4, 10123.5, ! -0.829102 10126.9, 10126.4, ! -0.415039 10130.8, 10129.8, ! -1.03711 10133.8, 10133, ! -0.830078 10139.4, 10137.7, ! -1.65918 10141, 10139.6, ! -1.45117 10142.1, 10140.4, ! -1.6582 10152.6, 10150.3, ! -2.28027 10153.5, 10151, ! -2.4873 10154.7, 10153.4, ! -1.24414 10155.6, 10154.5, ! -1.03711 10163, 10161.8, ! -1.24414 10166.1, 10164.7, ! -1.45117 10170.1, 10168.2, ! -1.86621 10171.3, 10169.6, ! -1.6582 10171.7, 10170.5, ! -1.24414 10174.2, 10173.1, ! -1.03613 10174.8, 10174.2, ! -0.62207 10190, 10188.5, ! -1.45117 10192.9, 10191.8, ! -1.03613 10194.4, 10194, ! -0.414062 10198.1, 10197.3, ! -0.829102 10203.2, 10200.3, ! -2.90234 10206, 10204.2, ! -1.86523 10207, 10205.1, ! -1.86621 10208.9, 10206.6, ! -2.28027 10224.3, 10224.5, ! 0.207031 10226.8, 10226.8, ! 0 10232.6, 10231.1, ! -1.45117 10235, 10233.3, ! -1.6582 10235.6, 10233.9, ! -1.6582 10236.5, 10234.6, ! -1.86523 10238.3, 10236.4, ! -1.86523 10240.9, 10240.3, ! -0.621094 10244, 10243, ! -1.03613 10252.8, 10250.7, ! -2.07324 10254.7, 10252.2, ! -2.48828 10255.9, 10254.1, ! -1.86523 10259.4, 10257, ! -2.4873 10262.1, 10263.8, ! 1.65918 10273.4, 10271.8, ! -1.6582 10274.7, 10273.2, ! -1.45117 ~ ! 10276.9, 10275.2, 10279.8, 10277.9, 10281, 10279.5, 10282.7, 10281.4, 10292.4, 10290.5, 10295.5, 10293.4, 10297, 10294.8, 10297.9, 10297.3, 10308.2, 10306.3, 10310.8, 10310.2, 10314.4, 10313.4, 10366.9, 10361.3, 10369.4, 10363.4, 10396, 10392.7, 10398.3, 10395.2, 10400.2, 10396.9, 10405.8, 10402.6, 10410.5, 10406.5, 10412.2, 10407.8, 10418.6, 10416.3, 10422.5, 10420.4, 10426, 10422.9, 10427.9, 10425.2, 10430, 10427.5, 10433.3, 10431, 10438.5, 10434.3, 10443.9, 10438.9, 10446.3, 10444.9, 10454, 10452.4, 10456.7, 10455.3, 10466, 10461.3, 10469.8, 10466.7, 10477.6, 10475.4, 10481.2, 10478.7, 10496.9, 10494, 10501.5, 10501.1, 10503.8, 10504.4, 10520.6, 10518.2, 10523.3, 10520.6, 10526.5, 10522.9, 10529.1, 10525.2, 10531, 10526.7, 10533, 10528.7, 10535.5, 10532.6, 10537.7, 10535.2, 10539.6, 10538.2, 10543.4, 10542.4, 10546.7, 10545.5, 10551.8, 10548.7, 10554.3, 10552.4, 10557.5, 10555, 10562.7, 10558.9, 10586.2, 10580.8, 10587.5, 10581.9, 10588.3, 10582.9, 10620.2, 10617.9, 10622.4, 10619.9, 10623.5, 10621.3, 10651, 10651.5, 10656.6, 10655, 10659,1, 10658.1, 10664.8, 10663.1, 10665.8, 10663.9, 10698.8, 10697.3, 10700.2, 10699.6, 10702.1, 10701.1, 10727.5, 10726.4, ! -1.6582 ! -1.86523 ! -1.45117 ! -1.24414 ! -1.86621 ! -2.07324 ! -2.28027 ! -0.62207 ! -1.86621 ! -0.62207 ! -1.03613 ! -5.59766 ! -6.01172 ! -3.31641 ! -3.10938 ! -3.31738 ! -3.10938 ! -3.93848 ! -4.35254 ! -2.28027 ! -2.07324 ! -3.10938 ! -2.69531 ! -2.4873 ! -2.28027 ! -4.14648 ! -4.97559 ! -1.45117 ! -1.6582 ! -1.45117 ! -4.76758 ! -3.10938 ! -2.2793 ! -2.4873 ! -2.90234 ! -0.415039 ! 0.621094 ! -2.4873 ! -2.69531 ! -3.52441 ! -3.93848 ! -4.35352 ! -4.35352 ! -2.90137 ! -2.4873 ! -1.45117 ! -1.03711 ! -1.24414 ! -3.10938 ! -1.86523 ! -2.4873 ! -3.73145 ! -5.38965 ! -5.59668 ! -5.38965 ! -2.28027 ! -2.4873 ! -2.28027 ! 0.414062 ! -1.6582 ! -1.03711 ! -1.6582 ! -1.86523 ! -1.45117 ! -0.62207 ! -1.03613 ! -1.03613 ~ ~ 10729.5, 10728.5, ! -1.03613 10736.6, 10733.5, ! -3.10938 10737.6, 10734.7, ! -2.90234 10740.3, 10736.1, ! -4.14648 10745, 10741.1, ! -3.93848 10746.1, 10742.4, ! -3.73145 10749.4, 10745.7, ! -3.73145 10867.1, 10869.4, ! 2.28027. 10868.7, 10870.4, ! 1.6582 10870.8, 10872.7, ! 1.86621 10875.8, 10876, ! 0.207031 10882.3, 10879.8, ! -2.4873 10884.4, 10882.7, ! -1.65918 10886.3, 10885.1, ! -1.24414 10887.9, 10885.8, ! -2.07227 10890.3, 10887.8, ! -2.4873 10892.5, 10890.3, ! -2.28027 10894.4, 10892.3, ! -2.07324 10895.8, 10893.7, ! -2.07324 10897.2, 10895.4, ! -1.86523 10899.9, 10898.3, ! -1.6582 10903, 10900.3, ! -2.69434 10904, 10902, ! -2.07324 10906.8, 10904.3, ! -2.4873 10911.7, 10908.4, ! -3.31641 10921.6, 10919.9, ! -1.6582 10973.5, 10970.4, ! -3.10938 11003, 11001.5, ! -1.45117 11023.1, 11019.4, ! -3.73145 11026, 11022.1, ! -3.93848 11032.6, 11030, ! -2.69934 11033.1, 11030.8, ! -2.28027 11034.9, 11032.2, ! -2.69434 11036.2, 11034.1, ! -2.07324 11038.5, 11035.6, ! -2.90234 11039.9, 11036.4, ! -3.52441 11041.6, 11038, ! -3.52441 11042.8, 11039.3, ! -3.52441 11044.5, 11041.1, ! -3.31738 11045.7, 11042.2, ! -3.52441 11047.4, 11044.1, ! -3.31738 11049, 11046.3, ! -2.69531 11051.1, 11049.9, ! -1.24414 11054.8, 11053.2, ! -1.65918 11056.7, 11056.3, ! -0.415039 11082.6, 11081.4, ! -1.24414 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 284 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 ~ 1024 ~ ~ *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 02-18BPB1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 02-18BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL of Schlumberger MCNL dated 08-Jun-2007 per pouglas Dortch with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 124 Tape File Start Depth = 9696.000000 ~ ~ Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 137 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 02-18BPBl.xtf LCC 150 CN BP Exploration (Alaska) WN 02-18BPB1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ------------------ CNAM ------- ODEP GR GR ----- GRAX -------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ~ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 247 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 260 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD Ol/06/08 1442140 O1 **** REEL TRAILER **** MWD 08/11/18 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~ ~ ~ Tape Subfile 1 is type: LIS ~ ~ Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 38.7242 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.2676 1.1466 0.1836 0.1836 10100.0000 80.0095 23.3700 2179.3999 6064.5400 130.8446 87.6463 10200.0000 24.8524 14.5000 2179.3999 1229.6970 122.3204 117.7200 10300.0000 38.6680 50.1626 2179.3999 6064.5400 276.0020 173.2809 10400.0000 28.9297 59.9231 2179.3999 187.9814 97.7166 103.5627 10500.0000 43.4530 76.9797 2179.3999 6064.5400 378.7450 227.5939 10600.0000 25.6403 26.8967 2179.3999 6064.5400 72.0869 54.4361 10700.0000 32.8307 56.3779 2179.3999 6064.5400 309.9522 246.0531 10800.0000 41.4817 79.2888 2179.3999 6064.5400 201.9380 164.7540 10900.0000 153.9683 46.7071 2179.3999 6064.5400 231.7055 401.5262 11000.0000 49.1932 118.0920 2179.3999 6064.5900 117.8310 94.3466 11100.0000 33.9602 59.2014 2179.3999 6064.5400 339.1860 218.2137 11200.0000 102.2633 95.0070 2179.3999 6064.5400 165.5625 118.1492 11300.0000 74.8256 94.1803 2179.3999 6064.5400 112.7200 91.4560 11400.0000 65.4605 102.2199 2179.3999 6064.5400 116.1216 91.4560 11500.0000 74.6791 66.7396 2179.3999 6064.5400 s 97.9722 88.4580 11600.0000 60.6598 72.8041 72.2130 75.7160 11700.0000 147.6006 61.4998 18.5987 14.5826 11800.0000 68.7404 52.2631 34.6390 46.2846 11900.0000 -999.2500 61.1598 -999.2500 -999.2500 11917.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 2179.3999 2179.3999 68.6792 -999.2500 -999.2500 156.9263 28.7964 33.3581 -999.2500 -999.2500 ~ • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9696.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9696.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 34.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 0.1670 3038.9370 0.2180 0.2160 10100.0000 26.9000 39.4000 2179.3999 6064.5400 154.8030 111.9740 10200.0000 16.1000 21.4000 2179.3999 6064.5400 208.7090 171.6360 10300.0000 42.3000 72.0000 2179.3999 6064.5400 276.0020 166.6300 10400.0000 27.9000 51.2000 2179.3999 580.6300 121.0300 127.2140 10500.0000 42.8000 78.4000 2179.3999 6064.5400 378.7450 234.5090 10600.0000 22.6000 34.6000 2179.3999 6064.5400 141.9550 109.7880 10700.0000 31.9000 88.3000 2179.3999 6064.5400 404.3720 333.8270 10800.0000 39.0000 78.1000 2179.3999 6064.5400 209.3870 164.7540 10900.0000 173.3000 54.5000 2179.3999 6064.5400 141.9550 141.7860 11000.0000 47.4000 95.5000 2179.3999 6064.5400 123.1120 98.2280 11100.0000 29.5000 99.4000 2179.3999 6064.5400 305.2670 208.0860 11200.0000 115.5000 64.3000 2179.3999 6064.5400 131.9790 100.0320 11300.0000 80.3000 98.0000 2179.3999 6064.5400 112.7200 88.4580 11400.0000 70.9000 104.3000 2179.3999 6064.5400 112.7200 88.4580 11500.0000 65.1000 112.3000 2179.3999 6064.5400 i 100.1500 91.4560 11600.0000 57.4000 75.6000 70.1900 73.5430 11700.0000 147.7000 62.5000 17.3920 12.9030 11800.0000 70.2000 46.0000 35.3820 48.0930 11900.0000 -999.2500 42.1000 -999.2500 -999.2500 11917.0000 -999.2500 64.4000 -999.2500 -999.2500 Tape File Start Depth = 9696.000000 Tape File End Depth = 11917.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 2179.3999 2179.3999 77.1570 -999.2500 -999.2500 151.9410 31.3020 34.6490 -999.2500 -999.2500 ~ ~ Tape Subfile 4 is type: LIS