Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
207-034
~ Well Histo File Co•r Pa e Image Pro~ect ry g XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ - ~ ~ ~- Well History File Identifier O anizing (done) r9 ^ Two-sided III II' lll II II) I) III ^ Rescan Needed III II'I II I) (I III III RESCAN DIGITAL DATA OVERSIZED (Scannable) ~olor Items: ^ Diskettes, No. p Maps: ~reyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ~~ /s/ Project Proo~ng ~ IIIIIIIIIIIIII IIIII BY: Maria Date: l ~ /s/ ~ Scanning Preparation ~_ x 30 =~Q_ + = TOTAL PAGES ~/ ~ /o Count does not include cover s eet /s/ BY: Maria Date: ~ g Production Scanning Stage 1 Page Count from Scanned File: ~(Count does include cover sheet) Page Count Matches Number in Scanning Pr paration: ~YES NO BY: Maria Date: ~~ ~ ~S~ V y 1~ ~~ ~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: ~S~ Scannin is complete at this point unless rescanning is required. II I II I) I~ I I' ~( I II 9 ReScanned II I II'I II I I II) I I'll BY: Maria Date: ~S~ Comments about this file: Quality Checked III II~III III IIII III 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 Mr. Tom Maunder Q,C) - 0 3 I Alaska Oil and Gas Conservation Commission 333 West 7 Avenue S _ 0 f fl Anchorage, Alaska 99501 P Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator III III BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal - ^' MPS-01A 2070340 , 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS -08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS-16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011 MPS-17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS -20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7282011 MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS-29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 S E OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other •• Abandoned ❑ Suspended 1b. Well Class: 20AAC 25 105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 11/26/2011 207 - 034 311 - 274 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 5/21/2007 50 029 - 23141 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 5/25/2007 MPS-01A 3375' FSL, 4714' FEL, SEC. 07, T12N, R11 E, UM 8. KB (ft above MSL): 72.04 15. Field / Pool(s): Top of Productive Horizon: 1375' FSL, 4931' FEL, SEC. 05, T12N, R11 E, UM GL (ft above MSL): 38.3' Milne Point Unit / Schrader Bluff Total Depth: 9. Plug Back Depth (MD +TVD): 1586' FSL, 4567' FEL, SEC. 05, T12N, R11 E, UM 3143' 2372' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 566077 y 6000045 Zone ASP4 8390' 4485' ADL 380110 TPI: x- 571096 y- 6003370 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 571458 Y 6003585 Zone- ASP4 N/A 18. Directional Survey: 0 Yes El No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: DIR, GR, RES, NEU /DEN, MDT, USIT, CCL, PWD, IFR /CASANDRA 3150' 2375' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 92# H -40 34' 112' 34' 112' 42" 260 sx Arctic Set (Approx.) 10 -3/4" 45.5# L -80 35' 3140' , 35' 2371' , 13 -1/2" 946 sx PF 'L'. 275 sx Class 'G' 7 -5/8" 29.7# L -80 3221' 8377' 2406' 4480' 9 -7/8" 653 sx Class 'G' 24. Open to production or injection? ❑ Yes ■4 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2 ", 12.6#, L -80 3625' - 7511' 7420' / 4103' MD TVD MD TVD 4 -1/2 ", 12.6#, L -80 7961' - 8053' 7961' / 4334' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED t +1,14 : ;:1 ■ , ,2 , ,? I I =� 7296' 7459' Set EZSV (in tubing), Pump 107 Bbls of Cement • °. 5989' 7100' - 7104' Tubing Punch, Pump 18 Bbls Cement 5897' -5899' & 4491' -4493' Punch Tubing & Jet Cut Tubing at 3625' 3143' 3384' Set EZSV & Pump K/O Plug w/ 41.3 Bbls Class 'G' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes °. No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summ ri - i, I. -. !sence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photo al -r? t :ur-I results per 20 AAC 250.071. None ` RBDMS DEC 0 9 2Q1 0 oi4 r fans.�rrs>poA t� Form 10-407 Revised 12/2009 CONTINUED ON REVERSE t�Orii final Only /2 - a -l/ 'riJ4t • 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATIO'ESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. TUZC 6459' 3679' MA 7012' 3909' M B 1 7059' 3929' MB2 7190' 3982' MC 7434' 4088' NA 7546' 4139' NB 7610' 4168' NC 7687' 4201' NE 7726' 4217' NF 7854' 4269' Top OA 7930' 4299' TSBC (Base OA) 8021' 4335' Top OB 8110' 4369' SBA5 (Base OB) 8188' 4400' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Terrie Hubble 1 % Title: Drilling Technologist Date: zltj7 MPS -01A 207 -034 311 - 274 Prepared ByName/Number. Tenie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Dave Johnson, 564 -4171 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10 -407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 12/2009 Submit Original Only • MPS -01A / AL1, Well History (Pre Rig Sidetrack) Date Summary 10 /08 /11 WELL S/I ON ARRIVAL. DRIFTED TBG W/ 3.70" BARBELL, TEL, & S.BAILER, LOC TT @ 7487' SLM/ 7510' MD (23' CORR), S/D @ 7654' SLM/ 7677' MD (STICKY). CURRENTLY IN HOLE W/ 2.70 SHOCK ABSORBER, XO, DUAL SPARTECH GAUGES. 1st 3hr STOP @ 7377' SLM (7400' MD). 10/09/11 RAN SBHP PER PROGRAM. OPENED SSD @ 7369' MD. RAN 3.50" LIB, S/D @ 7658' SLM/ 7681' MD, GOT FAINT IMPRESSION OF FILL, RDMO. WELL S/1 ON DEPARTURE. 10/09/11 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O= 200/0/200 PSI. TIE -IN TO TUBBING TALLY AT 7510' USING HORIZONTAL LINER SUMMARY DATED 06/02/2007. HALLIBURTON PLUG TO BE SET: 4 1/2" HES EZ DRILL -SVB SQUEEZE PACKER. OAW= 350 #, OAL= 25', MAX OD= 3.66 ". CCL TO MID / LEMENT = 7.7'. SET PLUG MID ELEMENT TO 7460' ACCORDING TO JEFF REA. TOP OF PLUG SFT AT 7459', BOTTOM OF PLUT SET AT 7461'. GOOD INDICATION SEEN AT SURFACE. POOH, c_td �� UN- STABBED, VISUAL CONFIRMATION THAT THE SETTING TOOL HAS FIRED. FINAL T /I /O= e 150/0/200 PSI. JOB COMPLETE. WELL LEFT SI UPON DEPARTURE. 10/10/11 T /I /O =SSV /120/200, Temp =SI. PPPOT-T (PASS), PPPOT -IC (PASS), pre RST. PPPOT -T: Stung into test port (0+ psi), bled to 0 psi. Functioned LDS (ET style), all moved freely (1"). Unable to pump through void, single port. Pressured void to 5000 psi for 30 min test, lost 50 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT -IC: Stung into test port (0 psi). Functioned LDS (ET style), all moved freely (1"). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. 10/10/11 T /I /0= 400/100/200 temp= SI Circ out Tx IA. CMIT Tx IA 2500 psi PASS [side track] Rigged up to IA and pumped 5 bbls neat, 291 bbls seawater, 100 bbls diesel down IA taking returns up Tubing and through F /L. Shut in wing and Pumped 2 bbls diesel to reach test pressures. CMIT Tx IA. T /IA lost 100/96 psi in 15 min's, 30/46 psi in 2nd 15 min's, for a total loss of 130/ 142 psi in 30 min's. Pumped additional 90 bbls diesel down IA while taking returns up Tubing and through F/L to freeze protect. Started U -tube. 10/11/11 Circ out well, CMIT -TxIA PASS, Freeze protect, Freeze protect flowline. U -tube Tbg x IA for 90 mins. Pumped 4 bbls neat down flowline for FP. Final WHPs= 0/0/200 10/18/11 Changout BOP's. Rebuild BOP's. MIRU. 10/19/11 Continue RU. Witnessed weekly full BOP test. RIH w/ HES Star Guide w/ knuckle joint. Stab into HES cement retainer w/ star guide. Establish circulation into reservoir (Inj = 2.0 bpm @ 1250 psi). Pump 107 bbls of 15.8 ppg. Laid in 40 bbls -at ement 1:1 attempt to circ into IA after 1 bbl behind pipe it locked up. Cleaned out cement to 7300'. Freeze protected well w / 38 bbls of 60/40 methanol. 10/20/11 Continue rigging down. Travel to SLB shop for safety tsand down. Job complete. 10/24/11 WELL S/I ON ARRIVAL. RUN KJ, 2.80" CENT & 2.25" DRIVE DOWN BAILER (mule flapper). S/D @ 2785' SLM, 3515' SLM, 3519' SLM RECOVER CEMENT. WELL S/I ON DEPARTURE. Pad Operator Notified. 10/26/11 General RU while wait on wind to subside (25 -32 mph) prior to raising mast. 10/27/11 RIH w/ BHA; 3.13" ctc, dfcv, 3.15" up jar, 3.38" disco, 3.13" circ sub, 3.15" motor, 3.7" diamond mill. (oal= 24.30'). Tag cmt stringer @ 3530. Mill thru, continue RIH tagging stringers at various depths. Tagged solid cmt @ 7296' , pump final sweep and start chase ooh. 10/28/11 Tubing punch 7100 -7104' CTM. Verify circ from tubing to IA and that 7 -5/8" was not penetrated. POH. LD tubing puncher, ASF. RIH w/ 2" nozzle. Park nozzle @ 7250'. Lay in 18 bbls 15.8 ppg cmt in tbg, open IA and circ 32 bbls cmt into IA. Pooh filling CTBS w/ diesel. Job complete. (notified AOGCC to witness BOP test due on 10- 30 -11) Page 1 of 2 • • MPS -01A / AL1, Well History (Pre Rig Sidetrack) Date Summary 10/29/11 WELL S/I ON ARRIVAL. RAN 2.69" CENT, 2' x 1 -7/8" STEM, 2.80" CENT, XO, SAMPLE BAILER. TAG CEMENT @ 5989' SLM. RECOVERED 1 TEASPOON OF CEMENT. 10/30/11 DRIFTED TO 4000' SLM W/ 3.66" CENT, 2' x 1 -7/8" STEM, 3.79" CENT, SAMPLE BAILER. NO RESTRICTIONS. WELL S/I ON DEPARTURE. 11/01/11 T /I /O= 20/0/200 MIT -T to 3000 psi PASS. Lost 180 psi in the first 15 and 55 psi in the second 15 mins. Used 1.5 bbls 60/40 to achieve test pressure, bled back 1.5 bbls. Final WHPs= 20/0/200 11/09/11 T /I /O =0 /VAC /0. Conducted PJSM. Verified barriers. R/U VR lubricator to FS IA. PT lubricator to 300 low & 3500 high (charted). Set 2" FMC VR plug. Tested VR plug to low & high. Removed IA & installed tapped blind flange w/ needle valve. PT flange to low & high (charted & recorded). Removed spool and actuated valve from BS IA. Installed integral to IA & blind to power fluid line. PT integral to low & high. Job complete. 11/14/11 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O = 20/100/0 PSI. WAIT ON CH2MHILL TO RIG DOWN HARD LINE IN FRONT OF WELL HOUSE. RIH WITH TUBING PUNCH TOOL STRING. SET DOWN DUE TO DEVIATION AT 4050'. POOH AND CHANGE TOOL STRING. RIH WITH SECOND TUBING PUNCH TOOL STRING. FINAL T /I /O = 20/0/500 PSI. 11/15/11 INITIAL T /I /O = 20/0/500 PSI. PUNCH TUBING FROM 5897'- 5899'. TAG TD AT 6021.4'. NO COMMUNICATION BETWEEN TUB AND IA. PUNCH TUBING FROM 4491'- 4493'. LRS VERIFIED COMMUNICATION BETWEEN TUB AND IA. JET CUT TUB AT 3625'. FINAL T /I /O = 30/30/0 PSI. WELL SHUT -IN UPON DEPARTURE. 11/15/11 T /I /0= 20/0/0 SI Pumped 7 bbls 60/40 to followed by 290 bbls FW to circ well out followed by 145 bbls heated diesel for FP. U -tubed DSL into TBG for a freeze protect. Pumped 6 bbls 60/40 meth down the flowline to freeze protect per the pad op. Pumped 3.36 bbls DSL down the IA to pressure up the TBG/ IA to 3000 psi ***FAILED*** 6th test. 15 min loss of 29/28 psi, 30 min loss of 24/24 psi. For a total loss of 53/52 psi, results inconclusive possibly due to thermal of wellbore fluids. Bleed pressure to 0 psi. Page 2 of 2 • • North America - ALASKA - BP • P 1 440- Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/15/2011 12:00 - 00:00 12.00 MOB N WAIT PRE RELEASED FROM MPS -39 AND WAITING FOR PRE -RIG WORK ON MPS -01 TO BE COMPLETED. - MPU WELLS MIT IA/TUBING. - FAILED INITIAL MIT TEST. - MPU WELLS P &A MPS -07 PRIOR TO RIG MOVE. - MOVING IN CEMENT SILOS AND PREPPING FOR CEMENT JOB. RIG CREWS CONTINUE TO SERVICE AND CLEAN RIG. 11/16/2011 00:00 - 00:00 24.00 MOB N WAIT PRE CONTINUE WAITING FOR PRE -RIG WORK ON MPS -01 TO BE COMPLETED. - MPU WELLS P &A MPS-07 PRIOR TO RIG MOVE. RIG CREWS CONTINUE TO SERVICE AND CLEAN RIG. HELD SAFETY MEETING WITH BOTH RIG CREWS, WSL, TOOLPUSHER AND ADW SAFETY ADVISOR. - REVIEWED GWO RIG FLOOR ACTIVITIES SLIDE PACK. - DISCUSSED DROPPED OBJECTS - ENGAGED CREW IN DISCUSSIONS AROUND DROPPED OBJECT PREVENTION. 11/17/2011 00:00 - 00:00 24.00 MOB N WAIT PRE CONTINUE WAITING FOR PRE -RIG WORK ON MPS-01 TO BE COMPLETED. - MPU WELLS GROUP RE- TESTED IA/TUBING ON MPS-01 - TEST RULED INCONCLUSIVE. - PRE -SPUD MEETING FOR MPS -01 HELD WITH ANCHORAGE TEAM. 11/18/2011 00:00 - 12:00 12.00 MOB N WAIT PRE CONTINUE TO WAIT ON PRE -RIG WORK TO MOVE ON TO MPS -01. 12:00 - 15:00 3.00 MOB N WAIT PRE CONTINUE TO WAIT ON PRE -RIG WORK TO MOVE ON TO MPS -01. PRE -SPUD MEETING WITH RIG CREW. 15:00 - 20:30 5.50 MOB P PRE MOVE RIG OFF OF MPS-39 TO MPS -01. - PJSM WITH RIG CREW FOR DERRICK UP MOVE. - MOVE PITS TO MPS -01. - MOVE SUB OFF OF MPS -39. - PLACE RIG MATS AROUND MPS -01. - MOVE AND SPOT SUB ON MPS -01. 20:30 - 22:30 2.00 MOB P PRE SPOT PITS AND CUTTINGS BOX.. 22:30 - 00:00 1.50 MOB P PRE HOOKUP LINES TO PITS. SPOT OPEN TOP TANK. ACCEPT RIG AT 00:00. 11/19/2011 00:00 - 03:30 3.50 MOB P PRE CONTINUE TO TAKE ON 9.2PPG BRINE TO PITS. Printed 11/28/2011 11:31:44AM North - ALASKA - BP Page 2 eFi'A- Operation Summary Report . Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:00 0.50 MOB P PRE RIG EVACUATION DRILL AND AAR. - RIG CREW AND VAC TRUCK DRIVERS ON SITE REPORTED TO PRIMARY MUSTER AREA. - REVIEWED LIST OF PERSONNEL AND ALL WERE ACCOUNTED FOR. - DISCUSSED THE LOCATION OF THE ROSTERS AND MUSTER LOCATIONS ON PAD. 04:00 - 04:30 0.50 MOB P PRE HELD PRE -SPUD MEETING WITH RIG CREW. 04:30 - 06:00 1.50 BOPSUR P PRE RIG UP AND PERFORM MIT OF OA AND IA/TBG. - PJSM WITH RIG CREW. - PRESSURE TEST IA / TBG - 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - 3500 PSI HIGH FOR 30 CHARTED MIN. - LOST 30 PSI IN THE FIRST 15 MIN. - LOST 14 PSI IN THE SECOND 15 MIN. - PRESSURE TEST THE OA - ROLLING TEST OF 600 PSI FOR 5 CHARTED MIN. 06:00 - 07:30 1.50 BOPSUR P PRE RIG UP AND TEST WELL SUPPORT LUBRICATOR. - PJSM WITH RIG CREW AND MPU WELL SUPPORT CREW. - RIG UP LUBRICATOR. - PRESSURE TEST LUBRICATOR. - 250 PSI LOW FOR 5 CHARTED MIN. - 3500 PSI HIGH FOR 5 CHARTED MIN. - HAD TO CYCLE TREE VALVES AND BUMP PRESSURE UP 3 TIMES TO GET A TEST. - GOOD TESTS. 07:30 - 08:30 1.00 BOPSUR P PRE PULL BPV AND SECURE LUBRICATOR. 08:30 - 09:30 1.00 BOPSUR P PRE MONITOR WELL FOR 1 HOUR. 09:30 - 13:00 3.50 BOPSUR P PRE INSTALL TWC AND TEST. - TEST TWC FROM ABOVE. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - HAD TO BUMP UP PRESSURE 5 TIMES TO GET A HIGH PSI TEST. - TEST TWC FROM BELOW. - 250 PSI LOW AND 2500 PSI HIGH FOR 5 CHARTED MIN EACH. 13:00 - 15:00 2.00 BOPSUR P PRE NIPPLE DOWN AND LAY DOWN TREE. - INSPECT THREADS AND COUNT TURNS ON HANGER. 15:00 - 20:00 5.00 BOPSUR P PRE NIPPLE UP BOP STACK. - PJSM WITH RIG CREW. - INSTALL DSA AND PLACE STACK ON TOP OF TUBING SPOOL. - FABRICATE AND INSTALL A NEW RISER. 20:00 - 21:00 1.00 BOPSUR P PRE INSTALL 4 1/2" TEST JOINT AND FUNCTION TEST BOP. Printed 11/28/2011 11:31:44AM I North .rJca - ALASKA - BP Page 3441 Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 BOPSUR P PRE TFST BOPE PER AOGCC REGULATIONS AND BP ADWOP POLICY. PRESSURE TESTED TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. - TESTED ALL CHOKE MANIFOLD VALVES (16 TOTAL). (e - MANUAL CHOKE AND MANUAL KILL VALVES. - HCR CHOKE AND HCR KILL VALVES. - FULL OPENING SAFETY VALVES (3 1/2" AND 4 "). - 4" DART VALVE. - AIR ACTUATED IBOP ON TOP DRIVE. - MANUAL IBOP ON TOP DRIVE. - UPPER 3 1/2" x 6" VBRS WITH 4 1/2" TEST JOINT. - LOWER 2 7/8" x 5" VBRS WITH 4 1/2" TEST JOINT. - SUPER CHOKE AND MANUAL BEAN CHOKE. - 250 PSI LOW AND 1600 PSI HIGH FOR 5 CHARTED MINUTES. CLOSING TIMES: - ANNULAR CLOSED IN 39 SEC. - UPPER VBRS CLOSED IN 6 SEC. - BLIND /SHEAR RAMS CLOSED IN 12 SEC. - LOWER VBRS CLOSED IN 6 SEC. TESTS WITNESSED BY BP WSL AND NABORS TOOLPUSHER. - AOGCC, JEFF JONES, WAIVED THE STATE'S RIGHT TO WITNESS THE TEST. Printed 11/28/2011 11:31:44AM Norte rica - ALASKA - BP • Page 4 cf' a Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/20/2011 00:00 - 03:30 3.50 BOPSUR P PRE CONTINUE TEST BOPE PER AOGCC REGULATIONS AND BP ADWOP POLICY. PRESSURE TESTED TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. - TESTED ALL CHOKE MANIFOLD VALVES (16 TOTAL). - MANUAL CHOKE AND MANUAL KILL VALVES. - HCR CHOKE AND HCR KILL VALVES. - FULL OPENING SAFETY VALVES (3 1/2" AND 4 "). - 4" DART VALVE. - AIR ACTUATED IBOP ON TOP DRIVE. - MANUAL IBOP ON TOP DRIVE. - BLIND /SHEAR RAMS. - UPPER 3 1/2" x 6" VBRS WITH 3 1/2" AND 4 1/2" TEST JOINT. - LOWER 2 7/8" x 5" VBRS WITH 3 1/2" AND 4 1/2" TEST JOINT. - ANNULAR PREVENTER WITH 3 1/2" TEST JOINT. - SUPER CHOKE AND MANUAL BEAN CHOKE. - 250 PSI LOW AND 1600 PSI HIGH FOR 5 CHARTED MINUTES. CLOSING TIMES: - ANNULAR CLOSED IN 39 SEC. - UPPER VBRS CLOSED IN 6 SEC. - BLIND /SHEAR RAMS CLOSED IN 12 SEC. - LOWER VBRS CLOSED IN 6 SEC. PERFORMED AN ACCUMULATOR DRAWDOWN TEST. - 14 SEC TO 200 PSI. - 85 SEC TO FULL PRESSURE. - 5 BOTTLES WITH 2100 PSI. TESTS WITNESSED BY BP WSL AND NABORS TOOLPUSHER. - AOGCC, JEFF JONES, WAIVED THE STATE'S RIGHT TO WITNESS THE TEST. 03:30 - 04:30 1.00 BOPSUR P PRE RIG DOWN BOPE TEST EQUIPMENT. - BLOW DOWN ALL LINES. 04:30 - 05:30 1.00 BOPSUR P PRE PULL TWC. - PICK UP MPU WELL SUPPORT LUBRICATOR - TEST LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN. EACH. - PULL AND LAY DOWN TWC. - MONITOR WELL. - RIG DOWN LUBRICATOR Printed 11/28/2011 11:31:44AM North Orioa - ALASKA - BP Page 5 Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:O0AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 06:30 1.00 BOPSUR P PRE RIG UP AND CIRCULATE OUT DIESEL FREEZE PROTECT FROM THE WELL. - PJSM WITH RIG CREW AND MUD ENGINEER. - CLOSE BLIND SHEAR RAMS. - LINE UP TO TAKE RETURNS TO OPEN TOP TANK. - CIRCULATE 150 BBLS DIESEL FREEZE PROTECT OUT OF THE WELL. - PUMPED A TUBING VOLUME AT 290 GPM; 780 PSI. - REDUCED PUMP RATE FOR REMAINDER OF CIRCULATION - 126 GPM; 125 PSI. 06:30 - 09:00 2.50 BOPSUR P PRE .__ RIr; HP TO PULL TUBING HANGER. - CHANGE ELEVATORS AND MAKE UP LANDING JOINT. - RIG UP SPOOLING UNIT FOR CONTROL LINE. - RIG UP POWER TONGS FOR PULLING TUBING. 09:00 - 09:30 0.50 PULL P DECOMP PULL TUBING HANGER FREE. - PJSM WITH RIG CREW AND FMC REPRESENTATIVE. - HANGER PULLED FREE AT 55K LBS. 09:30 - 10:30 1.00 PULL P DECOMP BREAK OUT AND LAY DOWN TUBING HANGER. RIG UP TO CIRCULATE WELL CLEAN. 10:30 - 12:30 2.00 PULL P DECOMP CIRCULATE WELL CLEAN. - PUMPED A 25 BBL BARA -CLEAN SWEEP. - CHASED SWEEP WITH 9.2 PPG BRINE. - 126 GPM; 80 PSI. - BLOW DOWN LINES. - OBSERVE WELL FOR 10 MIN. - WELL STATIC. - CHANGE ELEVATORS TO 4 1/2" YC TO PULL TUBING. 12:30 - 19:30 7.00 PULL P DECOMP PULL AND LAY DOWN 4 1/2" TUBING., - FROM CUT AT 3625' MD. - UP WEIGHT = 52K LBS. - RECOVERED THE FOLLOWING: - (86) JOINTS 4 1/2" IBT TUBING. - STRING SALVAGED FOR REUSE AS KILL STRING. - 2 COUPLINGS WERE BAD AND REJECTED. - (1) CUT JOINT 4 1/2" TUBING. - 2.59'; CLEAN CUT. - (1) GLM ASSEMBLY. - (1) 'X' NIPPLE ASSEMBLY. - (45) COMPLETE CONTROL LINE CLAMPS. - (1) 1/2 CONTROL LINE CLAMP. - (91) CONTROL LINE PINS. - MONITOR WELL. - WELL STATIC. - RIG DOWN TUBING RUNNING EQUIPMENT. 19:30 - 20:00 0.50 BOPSUR P DECOMP INSTALL 7" ID WEAR BUSHING. - RIG UP 4" DRILL PIPE ELEVATORS. - RIG UP TO PICK UP 4" HT -40 DRILL PIPE. Printed 11/28/2011 11:31:44AM Wirth i rica - ALASKA - BP Page s eft Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:30 0.50 CLEAN P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA #1 CLEAN OUT ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #1 AS FOLLOWS: - 6 3/4" USED BIT - 7 5/8" CASING SCRAPER - 4 3/4" BOOT BASKET - BIT SUB WITH FLOAT INSTALLED. - 'XO' OVERALL LENGTH = 12.56 ". MAX OD = 6.75 ". 20:30 - 00:00 3.50 CLEAN P DECOMP RUN IN THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY, PICKING UP 4" DRILL PIPE. - FROM 12' TO 2834' MD. - UP WEIGHT = 57K LBS; DOWN WEIGHT = 52K LBS. - FILLED THE DRILL STRING ON JOINT #90. - GREASED THE TOP DRIVE WASHPIPE. 11/21/2011 00:00 - 00:30 0.50 CLEAN P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY, PICKING UP4" DRILL PIPE. - FROM 2834' TO 3618' MD. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. - SET DOWN 5K LBS ON TUBING STUB. 00:30 - 01:00 0.50 CLEAN P DECOMP CIRCULATE THE WELL CLEAN. - CIRCULATED 3 BOTTOMS UP. - 550 GPM; 1650 PSI. 01:00 - 01:30 0.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY. - FROM 3618' TO BHA. - MONITOR THE WELL. - WELL IS STATIC. 01:30 - 03:30 2.00 CLEAN P DECOMP PULL AND LAY DOWN BHA #1, CLEAN OUT ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - TRACE AMOUNT OF SCALE IN THE BOOT BASKET. - CLEAN AND CLEAR RIG FLOOR. 03:30 - 05:30 2.00 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE UNIT. - PJSM WITH RIG CREW AND E -LINE CREW. - POSITION WIRELINE TRUCK AND RIG UP TO RUN E -LINE. 05:30 - 09:00 3.50 EVAL P DECOMP SURVEY WITH GYRO DATA CENTRALIZED GYRO -CAAT TOOL. - PJSM WITH RIG CREW, SCHLUMBERGER E -LINE CREW, AND GYRO DATA REPRESENTATIVE. - RUN IN THE HOLE WITH CENTRALIZED GYRO -CAAT TOOL TO 3515'. - SURVEY FROM 3515' TO SURFACE. Printed 11/28/2011 11:31:44AM North Erica - ALASKA - BP Wage 7 €; Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 18:30 9.50 EVAL P DECOMP LOG WITH SCHLUMBERGER ISOLATION SCANNER WITH GPIT- GR -CCL. - RIG UP AND RUN IN THE HOLE. - LOG FROM 3575' TO SURFACE. WSL AND BP NS SUPERINTENDENT REVIEWED THE GWO PRESENTATION ON DROPPED OBJECTS AND RIG FLOOR ACTIVITIES WITH THE RIG CREW. 18:30 - 20:30 2.00 DHB P DECOMP RIG UP AND RUN IN THE HOLE WITH HALLIBURTON 7 5/8" EZSV ON SCHLUMBERGER E -LINE. - PJSM WITH RIG CREW, SCHLUMBERGER E -LINE CREW AND HALLIBURTON REPRESENTATIVE. - PICK UP AND MAKE UP EZSV. - WARM UP PACKER ELEMENT PRIOR TO RUNNING IN THE HOLE. 20:30 - 22:00 1.50 EVAL N WAIT DECOMP WAIT FOR LOGS TO BE PROCESSED, SENT TO TOWN AND REVIEWED. - ISOLATION SCANNER LOGS UPLOADED TO SCHLUMBERGER INTER -ACT WEBSITE. - ODE AND SCHLUMBERGER TOWN ENGINEER REVIEWED LOGS. - PICK 7 5/8" CASING CUT POINT AT 3230' MD. - PICK EZSV SETTING DEPTH AT 3335' MD. 22:00 - 00:00 2.00 DHB P DECOMP CONTINUE IN THE HOLE AND SET THE HALLIBURTON EZSV. - RUN IN THE HOLE AND CORRELATE WITH LOGGING RUN. - SET HALLIBURTON EZSV AT 3335' MD. - 7 5/8" CASING COLLAR LOCATED AT 3327' MD. - PULL OUT OF THE HOLE WITH SCHLUMBERGER E -LINE. 11/22/2011 00:00 - 01:00 1.00 DHB P DECOMP PRESSURE TEST HALLIBURTON EZSV AND 7 , 5/8" CASING. - 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - 3500 PSI HIGH FOR 30 CHARTED MIN. - INITIAL TEST REJECTED DUE TO THERMAL ISSUES. - PRESSURE STABILIZED FOR 5 MIN. - LOST 200 PSI OVER THE NEXT 8 MIN. - RIG CREW TURNED ON RIG FLOOR HEATER. - PRESSURE INCREASED 170 PSI IN 3 MIN. - PRESSURE STABILIZED. - REPEATED TEST. - GOOD TEST. - DID NOT LOSE ANY PRESSURE OVER 30 MIN. 01:00 - 02:00 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E -LINE CREW. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. Printed 11/28/2011 11:31:44AM North "price - ALASKA - BP • Page 8 et-20 Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VVW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:30 1.50 FISH P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA #2, MULTI - STRING CUTTER. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #2 AS FOLLOWS: - MULTI - STRING CUTTER FOR 7 5/8 ", 29.7 LB /FT. - 6.75" STABILIZER - (3) 4 3/4" DRILL COLLAR - 'XO' OVERALL LENGTH = 101.42'. MAX OD = 6.75 ". MIN ID = 0.625 ". 03:30 - 07:30 4.00 FISH P DECOMP RUN IN THE HOLE WITH BHA #2, MULTI - STRING CUTTER, PICKING UP DRILL PIPE. - FROM 101' TO 3384' MD. - TAGGED EZSV AT 3384' DPM. - SET DOWN 5K LBS ON EZSV. 07:30 - 08:00 0.50 FISH N WAIT 3,382.00 DECOMP RIG CREW WAITING WHILE WSL AND ODE DISCUSSED PLAN FORWARD DUE TO TAGGING PLUG 49' DEEPER THAN INDICATED WHEN SET ON E -LINE. 08:00 - 13:30 5.50 FISH P DECOMP LOCATE COLLARS WITH CUTTER. - WORKED FROM 3268' TO 3221' ATTEMPTING TO LOCATE COLLARS. - LOCATED A COLLAR AT 3231' MD. 13:30 - 15:30 2.00 FISH P DECOMP POSITION CUTTER AND CUT 7 5/8" CASING. - POSITIONED STRING 10' ABOVE COLLAR LOCATED AT 3231' MD. - QUT 7 5/8" CASING AT 3221' MD. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. - 60 RPM; ROTATING WEIGHT = 60K LBS. - TORQUE = 2.2K FT -LBS. - STAGE PUMPS UP TO 294 GPM; 650 PSI. - CONFIRM CASING IS CUT. - PICK UP 2' AND RE- ESTABLISH CIRCULATION. - 210 GPM; 750 PSI. - OBSERVED A 385 PSI PRESSURE DROP ACROSS CUT DEPTH. 15:30 - 17:00 1.50 FISH P DECOMP DISPLACE OA FREEZE PROTECT WITH 9.2 PPG BRINE. - PJSM. - CLOSED THE ANNULAR AND OPENED THE OA TO THE OPEN TOP TANK. - CIRCULATE THROUGH CUT AT 126 GPM AND 360 PSI. - PUMPED 175 BBLS. 17:00 - 19:00 2.00 FISH P DECOMP LINE UP AND CIRCULATE TAKING RETURNS THROUGH THE GAS BUSTER AND BACK TO THE PITS. - MAX RATE THROUGH GAS BUSTER; 126 GPM; 403 PSI. - PUMPED 304 BBLS. 19:00 - 20:30 1.50 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA #2, MULTI - STRING CUTTER, STANDING BACK DRILL PIPE. FROM 3221' TO 101' MD. Printed 11/28/2011 11:31:44AM ... Nbrth rica - ALASKA - BP Page a af-2e- : 4110 Operation Summary Report . Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 FISH P DECOMP LAY DOWN BHA #2. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - LAY DOWN BHA AND CLEAR RIG FLOOR. 21:30 - 23:00 1.50 BOPSUR P DECOMP CHANGE UPPER PIPE RAMS TO 7 5/8" FIXED RAMS. - PJSM. - DRAIN STACK AND CLOSE BLIND / SHEAR RAMS. - CHANGE OUT UPPER PIPE RAMS. 23:00 - 00:00 1.00 BOPSUR P DECOMP TEST UPPER PIPE RAMS WITH 7 5/8" TEST, JOINT. - RIG UP TEST EQUIPMENT. - INSTALL TEST PLUG. - FILL STACK. - MAKE UP AND RUN IN WITH THE 7 5/8" TEST JOINT. 11/23/2011 00:00 - 00:30 0.50 BOPSUR P DECOMP TEST 75/8" UPPER PIPE RAMS. - TEST TO 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - TEST TO 3500 PSI HIGH FOR 5 CHARTED MIN. - GOOD TEST. 00:30 01:00 0.50 BOPSUR P ■- DECOMP RIG DD T EQUIPMENT. - LAY DOWN TEST TEST JOINT. - BLOW DOWN ALL LINES. 01:00 02:00 1.00 FISH P ■- DECOMP PICK UP BHA #3, 7 E" CASING SPEAR AS - PJSM WITH RI G CREW AND D BAKER FISHING REPRESENTATIVE. 02:00 - 03:00 1.00 FISH P DECOMP ENGAGE 75/8" CASING AND PULL FREE. - ENGAGE CASING WITH SPEAR. - BACK OUT LOCK DOWN SCREWS. - PULL CASING FREE. - WORK UP TO 200K LBS UP WEIGHT IN 25K LBS INCREMENTS. - BREAK CIRCULATION AT 126 GPM AND 60 PSI. - PULLED CASING FREE WITH 250K LBS. - PULLED HANGER TO FLOOR WITH 100K LBS. 03:00 - 05:00 2.00 FISH P DECOMP CIRCULATED A BARA -CLEAN PILL. - STAGED UP TO 550 GPM; 107 PSI. - PUMPED A 25 BBL BARA -CLEAN SWEEP. - CIRCULATED UNTIL RETURNS CLEANED UP. 05:00 - 05:30 0.50 FISH P DECOMP PULL AND LAY DOWN 7 5/8" CASING. - PULLED 4 JOINTS. - ALL 4 JOINTS WERE 7 5/8" TCII. RIG CREW WAS EXPECTING 7 5/8" BTC-M. - SAFETY JOINT AND XO'S WERE ALL SET UP FOR BTC-M. 05:30 - 06:30 1.00 FISH N HMAN - DECOMP WAITING FOR XO FOR WELL CONTROL. 06:30 - 11:30 5.00 FISH P DECOMP CONTINUE TO PULL AND LAY DOWN 7 5/8" CASING. - RECOVERED: - 80 FULL JOINTS. - 1 CUT JOINT 6.80' LONG. 11:30 - 12:00 0.50 FISH P DECOMP RIG DOWN CASING HANDLING EQUIPMENT. 12:00 - 13:00 1.00 REMCMT P DECOMP PICK UP TUBING HANDLING EQUIPMENT. Printed 11/28/2011 11:31:44AM North :rica ALASKA - BP Page 10 *ft Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VVW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 15:00 2.00 BOPSUR P ■- DECOMP CHANGE 5 PIP T . - FROM - FROM 7 5/8r " FIXED RAMS TO 3 1/2" x 6" VBRS. 15:00 - 17:00 2.00 BOPSUR P DECOMP PRESSURE TEST UPPER PIPE RAMS. - RIG UP TEST EQUIPMENT. - INSTALL TEST PLUG. r� ,✓- - MAKE UP 3 1/2" TEST JOINT. - PRESSURE TEST UPPER 3 1/2" x 6" VBRS 1 WITH 3 1/2" TEST JOINT. � - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - GOOD TEST. - RIG DOWN 3 1/2" TEST JOINT. - MAKE UP 4" TEST JOINT. - PRESSURE TEST UPPER 3 1/2" x 6" VBRS WITH 4" TEST JOINT. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - GOOD TEST. - RIG DOWN 4" TEST JOINT. - BLOW DOWN AND RIG DOWN TEST EQUIPMENT. 17:00 - 17:30 0.50 BOPSUR P DECOMP INSTALL 8.6875" ID WEAR RING. 17:30 - 18:30 1.00 REMCMT P -_ DECOMP RIG UP 3 1/2" TUBING RUNNING EQUIPMENT AND SAFETY VALVE. 18:30 - 19:30 1.00 REMCMT P DECOMP PICK UP AND RUN IN THE HOLE WITH 16 JOINTS OF 3 1/2" NSCT TUBING. - FROM SURFACE TO 496.52' MD. - TORQUE ALL CONNECTIONS TO 2800 FT -LBS. 19:30 - 20:00 0.50 REMCMT P ■- DECOMP RIG DOWN TUBING RUNNING EQUIPMENT. - RIG DOWN POWER TONGS. - CHANGE ELEVATORS. 20:00 - 22:30 2.50 REMCMT P DECOMP RUN IN THE HOLE WITH CEMENT STINGER, PICKING UP 4 ", HT -40 DRILL PIPE. - FROM 496.5' TO 3384' MD. - TAG EZSV WITH 5K LBS AT 3384' MD. - PICK UP 2' TO 3382'. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. 22:30 - 00:00 1.50 REMCMT P DECOMP RIG UP TO PUMP CEMENT. - INSTALL CEMENT LINES. - RIG UP CEMENT HEAD. - BLOW LINES BACK TO SCHLUMBERGER CEMENTERS TO ENSURE LINES ARE CLEAR. Printed 11/28/2011 11:31:44AM North Orioa - ALASKA - BP Page 11 eft® Operation :Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/24/2011 00:00 - 01:30 1.50 REMCMT P DECOMP PUMP CEMENT KICK -OFF PLUG. - PJSM WITH RIG CREW AND SCHLUMBERGER CEMENTERS. - BATCH UP 17.0 PPG, TYPE 'G' CEMENT. - YIELD = 1.00 CUFT /SK. - MIX WATER RATIO = 3.880 GAUSK. 00:50 - PUMP 5 BBLS 13.0 PPG MUDPUSH II. - 2.8 BPM AND 252 PSI. - SHUT DOWN PUMPS, CLOSE LOWER TIW VALVE. - PRESSURE TEST LINES TO 250/4000 PSI. - GOOD TEST. 01:07 - OPEN LOWER TIW VALVE AND PUMP 11.5 BBLS 13.0 PPG MUDPUSH II. - 2.6 BPM AND 183 PSI. 01:14 - LINE UP AND PUMP CEMENT. - PUMP 41.3 BBLS OF 17.0 PPG, TYPE 'G' CEMENT. - 4.4 BPM AND 1373 PSI. 01:23 - LINE UP AND PUMP 1.5 BBLS 13.0 PPG MUD PUSH II. - 1.8 BPM AND 69 PSI. 01:24 - LINE UP AND DISPLACE WITH 28.5 BBLS 9.2 PPG NACL BRINE. - DISPLACED WITH SCHLUMBERGER PUMPS. - 4.6 BBLS AWAY: 4.2 BPM AND 307 PSI. - 11.7 BBLS AWAY: 4.3 BPM AND 298 PSI. - 18.8 BBLS AWAY: 4.3 BPM AND 307 PSI. - 25.9 BBLS AWAY: 4.2 BPM AND 458 PSI. - 28.5 BBLS PUMPED. 01:32 - CEMENT IN PLACE. 01:30 - 02:00 0.50 REMCMT P DECOMP RIG DOWN CEMENT HEAD AND BLOW BACK LINES TO SCHLUMBERGER CEMENTERS. 02:00 - 02:30 0.50 REMCMT P DECOMP PULL OUT OF THE HOLE, STANDING BACK DRILL PIPE. - PULL 10 STANDS; FROM 3382' TO 2470' MD. 02:30 - 03:00 0.50 REMCMT P DECOMP DROP 5" WIPER BALL AND CIRCULATE TO CLEAN UP HOLE. - 550 GPM; 830 PSI. - TRACE AMOUNTS OF CEMENT BACK AT BOTTOMS UP. 03:00 - 04:00 1.00 REMCMT P DECOMP PULL OUT OF THE HOLE, STANDING BACK DRILL PIPE. - FROM 2470' TO 496' MD. 04:00 - 05:00 1.00 REMCMT P DECOMP RIG UP TO LAY DOWN 3 1/2" NSCT TUBING. - PJSM. - RIG UP TUBING HANDLING EQUIPMENT. 05:00 - 06:30 1.50 REMCMT P DECOMP PULL AND LAY DOWN 3 1/2" NSCT TUBING. - PJSM. Printed 11/28/2011 11:31:44AM Page 12 vf� North rica - ALASKA - BP Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:00 0.50 REMCMT P DECOMP RIG DOWN TUBING HANDLING EQUIPMENT. - CLEAN AND CLEAR RIG FLOOR. 07:00 - 08:00 1.00 BOPSUR P DECOMP PULL WEAR RING AND INSTALL A LARGER ID WEAR RING. - PULL 8.6875" ID WEAR RING. - INSTALL 10.0" ID WEAR RING. 08:00 - 09:00 1.00 CLEAN N WAIT DECOMP WAIT FOR 103/4" CASING SCRAPER TO ARRIVE ON LOCATION. - AFTER DISCUSSING CEMENT LAB REPORT WITH ODE, THE DECISION TO RUN A 10 3/4" CASING SCRAPER WAS MADE. - WAITING FOR BAKER FISHING TO ARRIVE ON LOCATION WITH A CASING SCRAPER. 09:00 - 11:00 2.00 CLEAN P DECOMP PICKUP BHA #3, 103/4" CASING SCRAPER AND DRESS -OFF ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #3 AS FOLLOWS: - 9 7/8" BLADED CEMENT MILL. - 10 3/4" CASING SCRAPER. - BIT SUB. - 'XO'. - BUMPER SUB. - 'XO'. - (3) 4 3/4" SPIRAL DRILL COLLARS. - 'XO' BACK TO HT-40. OVERALL LENGTH = 114.64'. MAX OD = 9.875 ". MIN ID = 2.250 ". 11:00 - 13:30 2.50 CLEAN P DECOMP RUN IN THE HOLE WITH BHA #3, PICKING UP 4" DRILL PIPE. - FROM 114' TO 2700' MD. 13:30 - 16:30 3.00 CLEAN P DECOMP_ WASH DOWN AND DRESS -OFF TOP OF CEMENT KICK -OFF PLUG WITH BHA #3. WASH FROM 2700' TO 2911' MD. - 210 GPM; 185 PSI. - 20 RPM. - WASH THROUGH GREEN CEMENT STRINGERS. - SET DOWN UP TO 3K LBS FROM 2889' TO 2911' MD. - BEGAN TAKING CONSISTANT WEIGHT AT 2911'. - PICKED UP AND SET DOWN ON PLUG WITH NO ROTATION. - 210 GPM; 185 PSI. - SET DOWN 5K LBS AND TAG CEMENT PLUG. - PICK UP 60' AND CIRCULATE 25 BBL HIGH -VS SWEEP. 16:30 - 18:00 1.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH BHA #3, STANDING BACK DRILL PIPE. - OBSERVE WELL. - WELL IS STATIC. - PULL OUT OF THE HOLE WITH BHA #3. Printed 11/28/2011 11:31:44AM North Orica - ALASKA - BP Page 13 e Operation Summary Rep Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:30 1.50 CLEAN P DECOMP LAY DOWN BHA #3, 10 3/4" CASING SCRAPER AND DRESS -OFF ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - LAY DOWN DRILL COLLARS. - LAY DOWN BHA PER BAKER FISHING REPRESENTATIVE. - SIGNS OF CEMENT IN BHA COMPONENTS. 19:30 - 00:00 4.50 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE UNIT TO RUN ISOLATION SCANNER. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. - SPOT E -LINE TRAILER AND TRUCK. - RIG UP SHEAVES AND TEST TOOLS. 11/25/2011 00:00 - 08:00 8.00 EVAL P DECOMP RUN IN THE HOLE WITH THE ISOLATION SCANNER WITH GPIT- GR -CCL ON SCHI IJMRFR(FR F -I INF - MADE MULTIPLE ATTEMPTS TO GET BLEOW 2670' SLM. - UNABLE TO GET DEEPER WITH CURRENT SET -UP. - LOG UP FROM 2670' SLM TO SURFACE. - AT 5 DEG / 6" HORIZONTAL/ AZMUTHAL RESOLUTION. - RUN BACK IN THE HOLE TO 600' SLM. - RE -LOG FROM 600' TO SURFACE. - AT 5 DEG / 1.5" HORIZONTAL/ AZMUTHAL RESOLUTION. 08:00 - 09:00 1.00 EVAL P DECOMP RIG DOWN ISOLATION SCANNER AND RIG UP TO RUN GYRO -DATA CAAT SURVEY TOOL ON SCHLUMBERGER E -LINE. 09:00 - 14:30 5.50 EVAL P DECOMP RUN IN THE HOLE AND SURVEY WITH GYRO -DATA CAAT ON SCHLUMBERGER E -LINE. - FROM 2475' TO SURFACE. 14:30 - 15:30 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E -LINE. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. 15:30 - 17:00 1.50 DHB P DECOMP PRESSURE TEST 10 3/4" CASING AND CEMENT KICK -OFF PLUG. - PRESSURE TEST CASING AGAINST THE BLIND /SHEAR RAMS. - TEST TO 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - TEST TO 2000 PSI HIGH FOR 30 CHARTED MIN. - LOST 216 PSI IN THE FIRST 15 MIN AND 194 PSI IN THE SECOND 15 MIN. - LOST 13 PSI PER MIN OVER THE FINAL 15 MIN TEST PERIOD. - LOST 410 PSI IN 30 MIN. -- 19% OF MAXIMUM TEST PRESSURE. - PRESSURE TEST FAILED ALL THREE INTEGRITY TEST CRITERIA. - DISCUSSED WITH ODE AND NS SUPERINTENDENT. - DECISION WAS MADE TO LOCATE A RTTS AND RE -TEST CASING. - CONTINUE WITH PLAN FORWARD AND RE -TEST WITH BHA IN THE HOLE. Printed 11/28/2011 11:31:44AM North *rica - ALASKA - BP Page 14 OW . Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 22:00 5.00 DRILL P WEXIT PICK UP BHA #4, 8 3/4" DRILLING ASSY. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. - PICK UP BHA #4 PER SPERRY SUN DD AS FOLLOWS: - HUGHES MXL -1X MILL -TOOTH BIT. - 7" SPERRY SUN MUD MOTOR WITH 1.5 DEG BEND. - INTEGRAL BLADE STABILIZER. - DM COLLAR. - DGR COLLAR. - PWD - ADR COLLAR. - HCIM COLLAR. - ALD COLLAR. - STABILIZER. - CTN COLLAR. - HOC. - FLOAT SUB WITH PORTED FLOAT. - (3) FLEX COLLARS. - (3) 5" HWDP. - DRILLING JAR. - (8) 5" HWDP. - XO TO HT -40. OVERALL BHA LENGHT = 581.57'. MOTOR REV /GAL = 0.33. MAX FLOW RATE = 650 GPM; MAX 80 RPM. 22:00 - 22:30 0.50 DRILL P WEXIT RUN IN THE HOLE WITH BHA #4 ON 4" DRILL PIPE. - CHANGE ELEVATORS. - RUN IN 2 STANDS OF DRILL PIPE TO 796' MD. 22:30 - 00:00 1.50 DRILL P WEXIT PRESSURE TEST 103/4" CASING. - RIG UP TEST EQUIPMENT. - CHASE ICE PLUG IN CEMENT MANIFOLD. - RIG UP TO PUMP DOWN BOTH DRILL STRING AND KILL LINE. 11/26/2011 00:00 - 01:00 1.00 DRILL N WEXIT PRESSURE TEST 103/4" CASING. - PRESSURE UP TO 2000 PSI. - CALLED TEST AFTER 15 MIN. - LOST 200 PSI IN 15 MIN WITH NO SIGNS OF STABILIZATION. - RIG DOWN AND BLOW DOWN TEST EQUIPMENT. 01:00 - 05:00 4.00 DRILL N WEXIT PULL OUT OF THE HOLE AND STAND BACK AS MUCH OF BHA #4 AS POSSIBLE. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. 05:00 - 07:30 2.50 REMCMT N WEXIT PICK UP AND RUN IN THE HOLE WITH A HALLIBURTON 10 3/4" RTTS. - PJSM WITH RIG CREW AND HALLIBURTON REPRESENTATIVE. - PICK UP RTTS AND RUN IN ON 4" DRILL PIPE. - FROM SURFACE TO 2892' MD. Printed 11/28/2011 11:31:44AM North Orioa - ALASKA - BP Page 15 Otte Operation.Summary Re . Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 09:00 1.50 REMCMT N WEXIT SET RTTS AND PRESSURE TEST 10 3/4" CASING. - SET RTTS AT 2892' PER HALLIBURTON REPRESENTATIVE. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 50K LBS. - PRESSURE TEST 10 3/4" CASING TO 250 / 2500 PSI FOR 30 CHARTED MIN. - LOST 15 PSI IN THE FIRST 15 MIN AND 6 PSI IN THE SECOND. - LOST LESS THAN 5 PSI / MIN IN THE LAST 15 MIN. ,GOOD TEST., - BLEED OFF PRESSURE AND RELEASE RTTS. 09:00 - 10:30 1.50 REMCMT N WEXIT PULL OUT OF THE HOLE AND LAY DOWN THE 10 3/4" RTTS. 10:30 - 16:00 5.50 DRILL N WEXIT PICKUP AND RUN IN BACK THE HOLE WITH BHA #4, 8 3/4" DRILLING ASSY. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. - MAKE UP MOTOR AND BIT ASSEMBLY. - SHALLOW HOLE TEST AT 114' MD. - 450 GPM; 750 PSI. - LOAD SOURCE. - TO 581' MD. - UP WEIGHT = 55K LBS; DOWN WEIGHT = 55K LBS. 16:00 - 17:00 1.00 DRILL P WEXIT RUN IN THE HOLE WITH BHA #4. - FROM 581' TO 2839' MD. - UP WEIGHT = 72K LBS; DOWN WEIGHT = 52K LBS. 17:00 - 18:00 1.00 DRILL P WEXIT WASH DOWN TO TOP OF CEMENT. - FROM 2839' TO 2911' MD. - 450 GPM; 110 PSI. - 40 RPM; 3.7K FT -LBS TORQUE. - UP WEIGHT = 72K LBS; DOWN WEIGHT = 52K LBS. - ROTATING WEIGHT - 65K LBS. - TAGGED TOP OF CEMENT WITH NO ROTATION. - SET DOWN 25K LBS ON CEMENT. SLOW PUMP RATES: - TMD = 2933', TVD = 2364'. - PUMP 1 -- 2 BPM AND 50 PSI; 3 BPM AND 110 PSI. - PUMP 2 -- 2 BPM AND 50 PSI; 3 BPM AND 110 PSI. M 0 k b Printed 11/28/2011 11:31:44AM Tree: 4- 1/16" - 5M FMC 11 41nPS - 0 1 A Orig. KB Elev. = 72. Doyon 14) Wellhead: 11" x 4.5" 5M Gen 6 Orig. GL. Elev.= 38.Doyon 14) w/ 4.5" TC -II T &B Tubing Hanger 4" CIW "H" BPV profile Al L , 20" x 34" insulated, 215 #/ft A -53 I 8 I GLM - 4.5" x 1" KBG -2 1 2404' // - roc \ O PL 3143' • �t,°� 7' 5/ $ 3�‘ �'A F.fr l ,/r Al HES 4.5" X Nipple 3.813" ID 1 2713' I - - - EZS V A,+ 3384 Tubing cut @ 3625' 10 3/4" 45.5 ppf L -80 BTC (Drift ID = 9.794, cap. = .0961 bpf) i ,o s Tubing punch @ 4491 -93' Al 10 3/4" Super Seal II Float Shoe 1 3140' 1 000 Tubing punch © 5897-99' (unable to circ) Slickline tagged cement @ 5989' slm 000 - -Estimated top of cement @ 6075' ° °�°' '" °^"° °' Tubing punch @ 7100` I ` a)) Phoenix Discharge psi Gauge 1 7358' ' I E I" �^,` W I 1 1 1 - 0 HES 4.5" XD DURO Sliding, Sleeve TC -11 1 7369' ----- '''''-,' ' c3. ! _ u� Phoenix Jet Pump Gauge 1 7393' n.�, °d HES 4.5" X Nipple 3.813" ID 1 7409' .- Baker 7 5/8" x 4.5" Premier Pkr. 4.5" TC -II 1 7420' 4.5 ", 12.6 #, L -80 IBT tbg. ( cap. = .0152 bpf, id = 3.958) X0 pup 4.5" TC -II Box x 4.5" IBT Pin 1 7427' 3.958" ID 7 5/8" 29.7 ppf, L -80, BTC -mod production casing HES EZ Drill Cement Retainer © 7459' ( drift ID = 6.750 ", cap. = 0.0459 bpf ) 7 5/8" 29.7# L -80 XO (TC -II x IBT) @ 6937' HES 4.5" X Nipple 3.813" ID 1 7489' I Wireline entry guide 1 7510' RA Tag @ 7870' O' Hook Wall Hanger Inside 7 5/8" Casing @ 7918' KOP @ 400' -`" ! t'' , 1"k 6 3/4" hole TD @ 10500' / Baker shoe @ 9919' 53+ degree from 1950' %; Max hole angle = 70.5 degree @ 3871' 62 degree @ Sleeve 4.4 '( Sa ri' ' 1S 20 Its, 4.5° 12 E# L 80 IBT= Slotted` - ,,9669' 13 )ts. 4.5°42.6# L 80 IBT7948'- 8466' MPS -01A L1 Window in 7 5/8" csg @ 7923 - 7935' .Q - Baker Swell Pkr. (Oil Sensitive) @ 8643' and 8728' Well angle © window is 67° - � Baker Swell Pkr. (Water Sensitive) @ 9759' and 9822' t T" 2- Baker ECP's @ 9940' and 10,020' 2- HES Float Collars @ 10,127' Baker "HRD" ZXP Liner Top Packer 7,961' HES Float Shoe @ 10,130' Baker "RS" Seal Sub 7,980' Baker 7 -5/8 x 5 -1/2" HMC Hyd. Liner Hng. 7,983' Baker seal bore rspt. 7,989' i i 4.5" HES X- Nipple ( 3.813 ") 1 8,021' 1 R WLEG 1 8,021' 1 '''-:-- 7 -5/8" Halliburton Float Collar 8292' 'OB' Sands 7 -5/8" Halliburton Float Shoe 8376' 4 Not Perforated , DATE REV. BY COMMENTS MILNE POINT UNIT 04/16/03 MDO Initial Drill & Complete Doyon 14 WELL S -01 A 06/10/07 REH Sidetrack Drill /Complete Doyon 14 API # 50- 029 - 23141 -62 -00 BP EXPLORATION (AK) 20- DEC -2011 $chhnrerger 5843 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 09 -18 BVYC -00017 SLIM CEMENT MAP TOOL 26- Nov -11 1 1 7> MPS -01A BY05 -00003 ISOLATION SCANNER U 7 , 03 25- Nov -11 1 1 F -05A BINC -00084 LEAK DETECTION LOG 19- Nov -11 1 1 P1 -03 BINC -00082 PPROF W/ DEFT & GHOST 17- Nov -11 1 1 17 -19A BJGT -00082 SBHPS 17- Nov -11 1 1 09 -12 BD88 -00183 MEMORY LDL 28- Nov -11 1 1 C -02 BYS4 -00005 PRIMARY DEPTH CONTROL 16- Nov -11 1 1 • 04 -350 BYS4 -00006 USIT 16- Nov -11 1 1 GC -2E BYS4 -00011 RST WATERFLOW 6- Dec -11 1 1 15 -09A BINC -00085 PRIMARY DEPTH CONTROL 8- Dec -11 1 1 09 -17 BAUJ -00104 MEMORY INJECTION PROFILE 30- Nov -11 1 1 MPE -12 BD88 -00185 MEMORY INJECTION PROFILE 14- Dec -11 1 1 16 -03 BG4H -00099 INJECTION PROFILE 28- Oct -11 1 1 MPL -24 BUTT -00004 MEMORY INJECTION PROFILE 6- Aug -11 1 1 2- 50/U -08 BD88 -00184 MEMORY (PROF W /DEFT GHOST 11- Dec -11 1 1 A -11 BSM4 -00018 INJECTION PROFILE 30- Oct -11 1 1 • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 , ::U.MARr •0y t r= 3,. SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. 2 07-0 L P.O. Box 196612 '^ Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Oil Pool, MPS -01A Sundry Number: 311 -274 Dear Mr. Allen: ,__'' g 2-111.1 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or eekend. Si -- - y, d e ■ • 0 .' om toner DATED this e day of September, 2011. Encl. STATE OF ALASKA (.4", ( 1 RECE1V OIL AND GAS CONSERVATION COMMISSION a, . �s► APPLICATION FOR SUNDRY APPROVAL )EP 01 2011 .. 20 AAC 25.280 Aa // 1. Type of Request: Aiiwka.Oil & Gas Cam. Cornminion ❑ Abandon ■4 Plug for Redrill - ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Progrark.lefllgi ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - ® Development ❑ Exploratory 207 -034 - 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50- 029 - 23141 -01 -00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: MPS -01A - Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 380110 - Milne Point Unit / Schrader Bluff 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 8390' - 4485' - 8390' - 4485' - None None Casino Length Size MD TVD Burst Collapse Structural Conductor 78' 20" 112' 112' 1490 470 Surface 3105' 10 - 3/4" 3140' 2371' 5210 2480 Intermediate 8346' 7 -5/8" 8377' 4479' 6890 4790 Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None 4 12.6# L - 80 7511' (& 7961' - 8053') Packers and SSSV Type: 7 - 5/8" x 4 - 1/2" Baker Premier Packer; Packers and SSSV 7420' / 4080' 7 - 5/8" Baker 'HRD' ZXP Liner Top Packer MD (ft) and TVD (ft): 7961' / 4310' 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal IN BOP Sketch ❑ Detailed Operations Program ❑ Exploratory -® Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: September 12, 2011 ❑ Oil ❑ WINJ ❑ WDSPL _ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned /J Commission Representative: ❑ WAG ❑ SPLUG - Suspended Sr 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Johnson, 564 -4171 Printed Name Kri Honas for Ken Allen Title Acting, Engineering Team Leader � ' Prepared By Name/Number 1 Si �j fir - Phone 564 - 4841 Date 7 ( ( Terrie Hubble, 564-4628 j "'Y� / Commission Use Only Conditions of approval: No ' Commission so that a representative may witness Sundry Number: 311 - 14 ❑ Plug Integrity OP Test ❑ Mechanical Integrity Test ❑ Location Clearance X 35 "sue &P ha l Other: ` Z�'cc) 14S: Ah ,4_ (cSf • ‘ J S ubsequent Form Required: / _ LiO 1 1r APPROVED BY Approved By: i OMMISSIO - THE COMMISSION Date 49 e e Form 10-403 Revised 01/2010 Submit In Duplicate RBDMS SEP 0 8 I `1% 0R1G1NAL 74- 1, 7/1, O 4 • Milne Point Well MPS -01A Schrader OA Horizontal Injector Sundry Notice MPS -01A, is a Long Term Shut -in well due to low oil rate and high water production. The proposed MPS -01 B rotary sidetrack is a slant dual - string completion, Schrader Bluff OA and OBa injector. This will be a replacement for MPS -07i which was shut -in due to a casing leak and is inoperable. MPS -07 will also be abandoned. The MPS -01 B injector is part of a pattern development to provide waterflood support to producer MPE- 24A/AL1 in HU -14 in the Milne Point Unit. This injector will be drilled just south of the other injector in this pattern MPE -29i and maintaining stand -off from the failed injector MPS -07i which had a matrix bypass event with MPE- 24A/AL1. adjacent offset wells. Present Well Condition Summary Casing Length Description MD TVD Burst Collapse Conductor 112 20" X 34" Insulated 112 112 1490 470 Surface 3140 10 -3/4" 45.5# L -80 BTC 3140 2375 5210 2480 Intermediate 8139 7 -5/8" 29.7# L -80 BTC -mod 8376 4489 6890 4790 Liner 2629 4 -1/2" 12.6# L -80 IBT Slotted 7919 -9919 4304 -4380 Slotted Slotted Tubing 7510 4 -1/2" 12.6# L -80 IBT 7510 4132 8430 7500 D Pert Depths (MD): None a »- „y p Re Suhicc� we�� ��, s t i/ cr.c' O ver S1 ,i5o , Pert Depths (TVD): None b o .o Ghtl l��f 1164,1 R w O tt✓ c. jr 9 ?, '� " ch o riel Procedure Note: The original cement volume for the 7 -5/8 casing pumped on 5/30/2007 was 135.5 BBLS (653 Sacks) of 15.8 PPG slurry. Assuming 40% excess for hole washout, the the top of cement is estimated at 5920' MD. It is planned to bring cement up to 5900' MD inside the 7 -5/8" X 4 -1/2" annulus and inside the 4 -1/2" tubing 7 ..* d45/ fie Pre -Rig Operations 1. PPPOT -T and IC. Function all LDS. 71/ 5 oo L - 6 tivc 2. Drift for cement retainer. Perform static bottom hole pressure survey. 3. Set cement retainer at 7450' MD. TBG punch. e ti /yam 4. Circ well. Cak 5. Sting into retainer with coil. Down squeeze 107 bbls of cement into lateral. 6. ✓Lay in 64 bbls in TBG and IA. TOC at 5900' MD. - K- 7. Tag TOC. Pressure test Cement to 2100 psi. Drift for jet cut. 8. Jet cut TBG at 3600' MD. 9. Set BPV • 7 CAetv-4 Press•{ .-� Drilling Rig Operations 10. MIRU. NU BOPE and test. 11. Pull 4 -1/2" string from 3600' MD. 12. PU DP. RIH w/ casing scraper to 3400' MD. 13. RIH and set 7" bridge plug at 3320' MD. • /� 14. Make mechanical cut at 3240' (below 10 -3/4" shoe) in 7 -5/8" casing. Pe /" C 15. Circulate out OA freeze protect, pull and lay down 7 -5/8" casing. 16. RIH w/ tubing stinger on DP and lay a 17.0 ppg cement plug from 7 -5/8" stub to 200' inside 10 -3/4" casing shoe (estimated at 36 bbls). 17. Dress off cement and prep to drill MPS -01 B sidetrack as per drilling permit. 11uJ 8 PTD 9/1/2011 Current Completion Bin; 4- 1116 " -5M FMC MPS -01 A Ong KB Elan= 7250 (Doyon14 Wellhead: 11' x 4.5" 5M Gen 6 Orig. GL Elev.= 38.30' (Doyon 1 wf4.5'TC -IIT &81 Tubing Hanger 4" C MV'N' BPV profile L X "x 34" insulated, 216 4y6 A -62 ( BC' ij _ _ r: GLM - 4.5" x 1' KBG -2 1 2404 1C 214" 45.5 ppt L -8C 13TC (Drift ID= 9.794, cap . =.C961bpi) MEM HES 4.5' X Nipple 3.81 3' ID I 2713 'IC 314" Super Seal II Float Shoe 1314C' , .z • :« y Phoenix Discharge psi Gauge 7358 I P 1 _ ( r t;, HES 4.5'X0 DURO Slung Sleeve TC -11 ( 7369 its • 4, Phoena Jet Pump Gauge ( 7393 I -- - -,- ^ HES 4.5'X Nipple 3.813'ID I 7409 I Al . ._ Baker 75 /8'x43' Premier PS. 4.5 "TC -II ' 7420' 4.5 L -8C IBT tkg (cap ■,C182kp1,id.,2 P88) I,V XO pup 4.S'TC- li Box x4.5 - ST Pin � 7427 3 958 ID 7 618" 29 7 ppt, 1.-BC, BTC -mod production caaing IIP (drat ID.E,7x- C ", cap ..C.C489bpi) a+sere HES 4.5 "XNipple3.813'ID 1 7489' 7 518"29.78 1-80 X0 (TC•11 x 1117) 06937' Pr- NW Wielme entry guide 1 7510' I RATag 0 7870 0 Hook Wore Hanger aside 7 sir Caang 0 7918 M 4 .. KOP 0 400 6 14' rot TD g 10600' 1 Bsrarshoe ! 9919 53+ degree from 1950 Max hole angle• 70.5 degree 03871 a ZOO 4 , 614y 62 degree ft Sleeve 'OA Sands 20 ¢x. 4.5 12. L tBT Sblted ener 8882 - 9669" t 13 lb 4 5' 12.6401-80 ST 7948 - 8466 3 g a � 3g Window in 7 5+8" csg 0 7923 - 7935 Z () 6B ' MPS -01A L1 D6 baker Well angle a window is 670 Seel Pie ON &metre' fe 86s9 sid8728 BaruerSwdl Re tWater Sere ereI 97% I srd982Z 2- 11w ECPs. 9943 ad 10 2- HES Float Colas 4 10.127' Baker'HRD' ZXP Leger Top Packer 119173111 HES Float Shoe @ 10.130 Baker 'RS Seal Sub 7 980 :"—L Baker 7 -518 x 5-117 HMC Hy,'" Liner Hag. man a g ?�� C y aw Baker seat bore rapt M, ,1 V � W 4 S' HES X- Nipple 3 8131 1 8,021' 1 --. WLEG 1 8021' I 7 -58" Hafburbn Float Coilar 8292' OB' Sands 7 -5r8' Halburbn Float Shoe 8376 4 NnPaf° ®eed 6,, DATE REV. BY CONVENTS MLNE POINT UNIT 04/16103 MDO Initial Drid & Complete Doyon 14 WELL S -09A 06/10+07 REH Sidetrack DrilVComplete Doyon 14 API S 50- 029 - 2314142 -00 BP EXPLORATION (AKI 9 9/1/2011 • Pre -Rig Abandonment Tree; 4-1/16" - 5M FMC MPS - 01A Ong. I.B Elev. = 72.E+0' (Doran 1q Wettead: 11' x 4.5' 5M Gen Orig. GL Elev.= 38.30' ( Doyon 1 q TC -II T &E Tubing Hanger _ 4' CNN 11 BPV prolie 2C" x .94" nauitted, 31E 410ttA -'_2 I BC' GLM- 4.5'x''KEG -2 24Cw I 1C 9/4" 45 5 ppt L -8C BTC (Drift ID= P.7P4,cap = .CPE1tpf NES4.5'XN;pple32113'ID 271: 1( 9/4" Super Seal II Float Shoe I ••14t I , , 4.5' Tubing Cut _ _ —� --. — 5930 MD Tap of Cement Tubing & Annulus • /�^^''y� 64 BBLS from packer • i,J • Phaeton)! Discharge psi Gauge 1 7358 I 000 HES 4.5" XD DURO Siding Sleeve TC -11 I 7369 • Phoe nor Jet Pump Gauge I 7393 I HES 4.5' X Nipple 3.813' L7 I 7409 • aker7 ' s4.5' Premier Pitt 4.5'TC -II [ 7420 I 457, 1 ?€K, L4C IBTttp (cap •.C1.2tpf, 3P X0 pup 45'TC- IlBoxx45 1ST Pin 7427 1 3959' ID 7 5/8" 29 ppf, L-SC, BTC -mod production caano 4.5' Ce entRe:a'a' ) a5 ✓ (drat ID. E_75C ", cap. - (:(45P Let) 7 18" 26.7111- 80X0(TGIItIBT)6,6637' HES 4.5 "X Nipple3.813'ID 7489 1 Wirekne entry gu/ae I 75- I RA Tat) 37 EELS alCe+ -e': • Hoo Wall Hanger •atae 7 SIB' Caen; g,* 7919 KOP 404 • • 8 3•n' not T3 �^ ict0 . Baker snoe 9919 53. dee gree from 1953 • Max hale angle =70.5aegra 36 • A' • 62 degree ^, S eave ' Sands °. 20 fts. 4 5• v u, L -80 1ST SiQHaalner 8882 - 9669 13 Joe. 4 5 12 6a L-60 t8T 794 - 8466. • • • • • • • Window in 7 5B' csg 7 923 - 7935 • • MPS-01A L1 Well angle wma.•tw i5 67° • y Baker Sorel Pic cal Sensvn•.el 88.03 aid8728 r Ba erSNel Pkr. Mier Senvc'.e1 C 9793 •,89822 a • • 2- Baia ECPs,Q 9940 and 1003: • 2- HES Floc Colors .0 10 127 Baker•HRD ZIP Liner Top Packer 7,96' • HES Flo; Sine {0.130 Baker • S5al Sub 7.983 Baker 7 -518 N8x 5-117 HMC Nye! Liner H1g 7,963 Baker seal bore rapt '.989 1 7, D 4 5' HES X- Nlople t 3 513 J 8,cr2 I WLEG 7- 518" Ha !libation Fbat Collar 8292 'OB' Sands 7 - 58' Hallburson Float Shoe 8376 4 Not Pab,md DATE REV BY COMMENTS MILNE POINT UNIT 04/16)03 MOO Initial Drill & Complete Doyon 14 WELL S -01 A 06/10/07 REH Sidetrack DrilVComplete Doyon 14 API # 50.029- 23141 -62.00 BP EXPLORATION (AK) 10 9/1/2011 Final Abandonment ] 4- 1/16' -5M FMC MPS-01P1 Ong. LB Elev. = 72.50' Woyon14) Wellead: 11' x 4.5' 5M Gen 6 Ong. GL. Elev.= 38.30' (Doyon 14 w1 4.5' T C -I I TS 6 Tubing Hanger 4' C AN "H' SPV profile 2( "x ea- moulatcd, 215;MA -S2 2940" MD Top of Cement 1( d4" 45.5 ppf L -8C BT0 36 B5LS (Drift ID= P.7P4,cap =.CPE1tpf) ~ • • IC 0/4" Super Seal II Flaat Shoe 1214C'j • • • • • • I y _ij I 7- 5 B'Brc 4 --->,.. _ 4.5' Tubing Cut 5930 MD T 64 op EB fro of Cement Tubing k er & Annulus m Phoenix Discharge psi Gauge 1 7358 I 0 -(ES 4.5' XD DURO Siang Sleeve TC -11 I 7369 I IEEE Phoenix Jet Pump Gauge 1 7393 I -(ES 4.5' X Nipple 3.813' D I 7449 I Baker 7 5/8" x 4.5' Premer Pkr. 4.5" TC -II 1 7420 I 4,5 1 2E L -SC IB1 ttp (cap •.C152tpf,rd.3958) XO pupa 5' TC-ii Box x 4 5 19T Pin 3955'ID ( 7427 I 7 E/S" 29 7 ppf, L.SC, BTC -mad production Canino 112 4.5' Ce^ e" t eta z 7453 _j (drat ID • EJSC ", cap • C.C454 bpi) 7 52" 29.71/ L-80 X 0 (TC -II x 1ST) 06937' HES 4.5"X N. pp ee 3.813'10 174 89 I Wrrehne entry guide I 75 1 RA Tao K 787 • •E 107 BBLSofCement • • • Hook Waa Hanger a side 7 98' Caen; 7818 KOP a 40CJ • - 8 3 a 53 +degree from 1953 • •v Max hole angle • 70.5 aegree i 3871 • 62 degree a Sleeve ;DA' Sands 20 f6.4.5'1 .6a L-80 ter Si:0.4 ner 8882 - 9669 „ t 3 ps. 4 S' t2 6• L-80 GT 7948 - 5466, • • • • Window in 7 543' csg a 7923 - 7935' • * = MPS•01A L? a 5344" Swel Pk (al Sersaree1 8843 and a 728 Well angle (it window is 67° • Baer Sadi Po {edger Seree.ei1=' 97% a,d9a22 • • 2- Boxer ECP C 9931 and 100x: • 2- HES Float Colors C 10.12? Baker'HRD' ZXP Liner Top Packer 7.96' • HES FloatShoe C 10.130 Baker Seal Sub 7.983 Baker? -51$-5 /5 x5 -177 HMC Hyd Liner Hnp 7 .983 43 I Baker seal bare rcpt -.959 4 5' HES X - Nipple 3 112" I B WLEG 1 8.02 1 ■ 7 -518' Hasburtn F bat Collar 8292 06• Sands 7 -5/8' Haliburtn Float Shoe 8376 lto:Palorated DATE REV. BY COMMENTS MILNE POINT UNIT 04/16/03 MOO Initial Dri9 & Complete Doyon 14 WELL S -01 A 06/10/07 REH Sidetrack Drill/Complete Doyon 14 API # 50429- 23141 -62.00 BP EXPLORATION (AK1 11 9/1/2011 ~; . _ ~.. ,: ~, ~k. ~ ~ ,tea,' ~r~ ~;w i4AT"a. ...8e. MICROFLLMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Fites\OLK9\Microfilm_Marker.doc ~~~~ ~ DATA SUBMITTAL COMPLIANCE REPORT 6/24/2009 Permit to Drill 2070340 Well Name/No. MILNE PT UNIT SB S-01A Operator BP EXPLORATION (ALASiCA) INC API No. 50-029-23141-01-00 MD 8390 ND 4486 Completion Date 6/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Oirectional Survey Yes DATA INFORMATI~N Types Electric or Other Logs Run: DIR, GR, RES, NEU/DEN, MDT, USIT, CCL, PWD, IFRlCASANDRA (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments I ~-~9 Corrosion 5 Col 1 150 6500 Case 6/11/2007 CCL, USIT, RE 7- 5/8'Casing 18-May-2007 Cement Evaluation 5 Col 1 150 6500 Case 6/11/2007 CCL, GR, USIT 18-May- 2007 Formation Tester 5 Col 1 7663 8161 Open 6/20/2007 Modular Formation Dynamics Tester 27-May- 2007 C Lis 15309~nduction/Resistivity 2800 8390 Open 8/3/2007 LIS Veri, GR, ROP, FET, NPHI, NCNT RHOB, DRHO 15309 LIS Verification 2800 8390 Open 8/3/2007 PB1 LIS Veri, GR, ROP, FET, NPHI, NCNT RHOB, DRHO 15512 LIS Verification 2808 8339 Open 10/3/2007 LIS Veri, GR, FCNT, NCNT, RHOB, DRHO, RPD, FET, ROP REDO C Lis 15512 ~nduction/Resistivity 2808 8386 Open 10/3/2007 LIS Veri, GR, FCNT, NCNT, RHOB, DRHO, RPD, FET, ROP Cement Evaluation 5 Col 7370 7980 Case 3/13l2008 CBL, SCMT, GR, CCL 21- Feb-2008 I C Pds 16032 'Cement Evaluation 7370 7980 Case 3/13/2008 CBL, SCMT, GR, CCL 21- ~~ Feb-2008 I Induction/Resistivity 25 Col 3145 8390 Open 11/3/2008 MD DGR, EWR, ROP, ~ ALD, CTN 27-May-2007 . ~ DATA SUBMITTAL COMPLIANCE REPORT 6124/2009 Permit to Drill 2070340 Well Name/No. MILNE PT UNIT SB S-01A Operator BP EXPLORATION (ALASF(A) INC API No. 50-029-23141-01-00 MD 8390 ND 4486 Completion Date 6/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N og Induction/Resistivity 25 Col 2373 4486 Open 11/3/2008 tvD DGR, EWR, ROP, ALD, 27-May-2007 D C 17118'Tnduction/Resistivity 0 0 Open 11/3/2008 PDS, EMF and CGM for EWR logs. Weil Cores/Samples Information: Name ADDITIONAL IPFORMATION Well Cored? Y/~ Daily History Received? ~~ N Chips Received? ~Y7T3- Formation Tops ~ N Analysis Y7'iG~ Received? Sample I~terval Set Start Stop Sent Received Number Comments ~ LJ Comments: Compliance Reviewed By: ~~~ Date: ~-l ~ tl~/LL, ~~ ~ ~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPS-O l A+L 1 ~ October 9, 2008 AK-MW-5043233 MPS-OlA+Ll • 2" x 5" MD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23141-01,62 2" x 5" TVD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23141-01,62 Digital Log Images: 1 CD Rom 50-029-23141-01,62 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 907-273-3536 Date: ~ ao'~--~3~-/ 1~~~~ ao~-~3~ r"~-~rq Signed: ~ / ~,Q~e~/ 4Ce `~~~Q.C,~cS, ~~~ ~, ~~~ ~v~e -~v 5e~e~o~-e ~e W2~lS Uul e55 h-' t,5 t~0 ~" 0. l ~oa,c~ j t~' i5 dcs~i cJ er-eo~ 0. 0~ ~~" ~'~~ w~ ~ ~.~ P `c~ 03l06lOS ~~r~l~~~~'~~~~ N0. 4621 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Pt.Mac,Milne Pt,Orion,Lisburne Well Job # Lo Descri tion Date SL Color CD C-41A 12021141 MEM LDL 02/25/OS 1 1 MPS-O1A 11970714 SCMT "} _ C 02l21/08 1 1 P1-06 11975757 PROD PROFILE ~ 03/02/08 1 1 Pi-05 11998992 PROD PROFILE ~ 02/29/08 1 1 P1-06 11975757 SCMT ~Qj' ~~ 03/02/08 1 1 09-23A 12045070 USIT ~- C ~ 03/02/08 1 1 LS-34 12057596 PROD PROFILE S ~ 02/28/08 1 1 W-40 11970816 PRODUCTION LOG -1 03/04/08 1 1 15-04B 12005202 MCNL ~Q - ~ C 12/28/07 1 1 C-35B 12021139 MCNL • ¢ 01/26/08 1 1 X-20A 11661178 CH EDIT PDC GR (MEM CORRELATION) _~ 10/26/07 a~ 1 1-219 12017479 CH EDIT PDC GR (IBC) - L /(p 01/02/08 1 PLEASE ACKNOWLEDGE RECEIPT ~Y`"~I~I~II~J~~/~ ~1ETU ~JING',ONE COPY EACH TO: BP Exploration (Alaska) Inc. ~ ~ -- - ~ -~~ ~ ~ ~"'~ ~ ~ ~ '~" Petrotechnical Data Center 1R2-1 900 E. Benson Blvd. ~,~ ~-, ~, Anchorage, Alaska 99508 i~ +~ ~ ~ (~~~ ) Date Delivered: ,,~.~~-, , ,,;i=:,~o,;~,:~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage,AK 99503-2838 ATTN: Beth Received by: ~ ~ u (3 s ~- WELL LOG TRANSMITTAL To: State of Alaska September 26, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Ancharage, Alaska 99~01 RE: MWD Formation Evaluation Logs MPS-OlA (REDO) AK-MW-5043233 1 LIS formatted CD with verification listing. API#: 50-029-23141-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTI01~1 OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 ~j'` :3 ~ _ ~ _ ~~ .r ''_I ..~. _.._ Date: ,,.,,-,-; J ~S . -. BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 ~ ~ Signed: b~- ~ ~LI ~ 'SS( ~- ~ s ~r WELL LOG TRANSMITTAL To: State of Alaska July 26, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPS-OlA_MPS-OlA PB1, AK-MW-5043233 1 LDWG formatted CD rom with verification listing. API#: 50-029-23141-O1, 71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Ancharage, Alaska 99518 ._ ~ ~ ~ _ Date: ~ ~ 'f~ _~ ~i ,~ ,. „ ~--~~ ,. :,~~+~~ ~!I ~. ~:a: ' - F' ,r ';~`~e;;} ;'~.nCl';C' . . BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Signed: ~0`~ - 03'~( ~ +~~38-~ /S 1 o q i~Ps-d~~ ~.~e-~ / S 3 e ~ ,26?-a3? M-ps~oip~.E . ~ STATE OF ALASKA ~ ~ /~~~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~~o!.~,~`~~.;r~~~~~ :. ~!_ ~. 0 2007 WELL COMPLETION OR RECOMPLETION REPORT AND LOG :~ ;.;r ~ ~~:~~.; f:~~~r~5. ~~mmission 1a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoEwc zs.,os zoaac Ze.i~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ~ '~` ~` ~ Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 6/10/2007 12. Permit to Drill Number 207-034 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 5/21/2007' 13. API Number S0-029-23141-01-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ~ ' 7. Date T.D. Reached 5/25/2007~ 14. Well Name and Number: MPS-01A " 3375 FSL, 4714 FEL, SEC. 07, T12N, R11 E, UM Top of Productive Horizon: 1375' FSL, 4931' FEL, SEC. 05, T12N, R11 E, UM 8• KB (ft above MSL): 72.04 " Ground (ft MSL): 38.6 15. Field / Pool(s): - Milne Point Unit / Schrader Bluff Total Depth: 1586' FSL, 4567' FEL, SEC. 05, T12N, R11 E, UM 9. Plug Back Depth (MD+ND) 8390 4486 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surtace: x- 566077 y- 6000045 Zone- ASP4 10. Total Depth (MD+TVD) 8390 4486 16. Property Designation: ADL 380110 - TPI: x- 571096 y- 6003370 Zone- ASP4 Total Depth: x- 571458 y- 6003585 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ~ Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIR, GR, RES, NEU/DEN, MDT, USIT, CCL, PWD, IFR/CASANDRA ?d~,b///il/DOS.~C! ~'~~•33 i~lO ~,~L ~T~'D 22. CASING, LINER AND CEMENTING RECORD CASING 'SETfINGDEPTH MD SETTING DEPTH NQ HQLE 'AMOUNT' WT. PER FL GRADE TOP BOTfOM TOP BOTTOM <SiZE CEMENtING R~CORD , PULLED' 3 20" 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set A rox. 10-3/4" 45.5# L-80 35' 3140' 35' 2371' 13-1/2" 946 sx PF'L' 275 sx Class'G' 7-5/8" 29.7# L-80 31' 8377' 31' 4480' 9-7/8" 653 sx Class 'G' 23. Open to production or inject ion? ^ Yes ~ No 24. ' Tuairrc, Recoso If Yes, IISt @8CI1 I~t@N8I Op@fl (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD None 4-1/2", 12.6#, L-80 7511' 7420' MD T1/D MD T1/D 4-1/2", 12.6#, L-80 7961' - 8053' 7961' Z~J. ACI D, FRACTURE, GEMEMT ~QUEEZE; ETC, DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED Freeze Protected with 100 Bbls of Diesel Z6. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: PROOUCT~or, FoR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CA~cu~a,reo 2a-HouR Rnre~ Oll-BBL: GAS-MCF: WATER-BBL: O!L GRAVlTY-API ~CORR~: 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results 071. CONtFLET60N None ~ _ . ~FL ,tllla I 71D07 ~ ~ +~ ~~~~ FO~fll ~0-407 R@VIS@C~ OZIZOO7 0 TINUED ON REVERSE SIDE 4~ ; ~~~~'(~ (j ~J ~ ~ U , i `~I f~ ~.. ~ ZH. C7EOLOGIC MARKERS ~LIST ALL FORMATIONS AND ERS ENCOUNTERED~: 29. FORMATION TESTS NAME MD TVD Well Tested . ~ Yes ^ No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit PermafroSt Base detailed test information per 20 AAC 25.071. TUZC 6459' 3679' MA 7012' 3909' See Attached MDT Summary Report MB1 7059' 3929' M 62 7190' 3982' MC 7434' 4088' NA 7546' 4139' N B 7610' 4168' NC 7687' 4201' NE 7726' 4217' N F 7854' 4269' Top OA 7930' 4299' TSBC (Base OA) 8021' 4335' Top OB 8110' 4369' SBA5 (Base OB) 8188' 4400' Formation at Total Depth (Name): SBA5 (Base OB) 8188' 4400' 30. List of Attachme~ts: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys, MDT Summary Report and a Leak-Off Test Summa . 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondra S~ man Title Technical Assistant Date ~~ y~~"~~ MPS-01 A 207-034 Prepared By Name/Number.~ Sond~a StewmBn, 564-4750 Well Number Permit No. / A fOV81 NO. Drilling Engineer: Dave Johnson, 564-4171 INSTRUCTIONS GeNeRn,~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM ia: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Irea~ 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (expfain). Ireae 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Weeh ad/ 11" x 4 5F5M Gen 6~ M PS-01 A O~B.eeeev.= 38.30' (Doyon 14) w/ 4.5" TCII T&B Tubing Hanger 4" CIW "H" BPV profile 20" x 34` insulated, 215 #/ft A-53 10 3/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. _ .0961 bpf) 10 314" Super Seal II Fioat Shoe 3140' , 7 5/8" 29.7 ppf, L-80, STRC-mod production casing ( drift ID = 6.750", cap. = 0.0459 bpf ) 4.5", 12.6#, L-80 IBT tbg. ( cap. _ .0152 bpf, id =3.958 ) 7 5/8" 29.7# L-80 XO(TCII x IBT) @ 6937` KOP @ 400` 53+ degree from 1950' Max hole angle = 70.5 degree @ 3871 ` 62 degree @ Sleeve GLM- 4.5" x 1" KGB-2 2404' HES 4.5" X Nipple 3.813" ID 2713' Pheonix Discharge psi Gauge 7358' HES 4.5" XD DURO Sliding Sleeve TC-11 7369' Phoenix Jet Pump Gauge 7393` HES 4.5" X Nipple 3.813" ID 7409' Baker 7 5/8" x 4.5" Premier Pkr. 4.5" TC II 7420' XO pup 4.5" TC II Box x 4.5" IBT Pin 742~~ 3.958"ID HES 4.5" X Nipple 3.813" ID 7489' Wireline entry guide 7510` Hook Wall Hanger Inside 7 5/8" Casing @ 7918' 20 jts. 4.5" 12.6# L-80 IBT Slotted liner 8882' - 9669' 13 jts. 4.5" 12.6# L-80 IBT 7948' - 8466' MPS-01A L1 RA Ta g @ 7870' Baker Swell Pkrs. (Oil Sensitive) @ 8643' and 8728' Bakef Ti2 BaCk Sleeve 7885' Baker Swell Pkrs. (Waler Sensitive) @ 9759' and 9822' Baker ZXP Liner Top Packer 7,892' 2- Baker ECP's @ s9ao' and 10,020' Baker 7-5/8" x 5" HMC Liner Hanger 7,898' 2- HES Float Collars @ 10,t27' HES Float Shoe @ 10,130' Baker "HRD" ZXP Liner Top Packer 7 961' Baker "RS" Seal Sub 7 980' Baker 7-5l8 x 5-1/2" HMC Hyd. Liner Hng. 7,983~ ~~ ~~ ~~ Baker seal bore rspt. ~ ggg~ e 4.5" HES X-Nipple ( 3.813") 8 021' 7-5/8" Halliburton Float Collar 8292' 7-5/8" Halliburton Float Shoe 8376' DATE REV. BY COMMENTS 04/16/03 MDO Initial Drill & Complete Doyon 14 06/10/07 REH Sidetrack Drill/Complete Doyon 14 MILNE POINT UNIT WELL S-01 A API # 50-029-23141-62-00 ~ ~ Legal Well Name: ~Common Well Name ~' Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 5/15/2007 ~ 00:00 - 01:30 1.50I MOB I P 01:30 - 04:30 3.00 MOB P 04:30 - 06:30 2.00 MOB P 06:30 - 14:00 7.50 MOB P 14:00 - 21:00 7.00 MOB P 21:00 - 00:00 3.00 RIGU P 5/16/2007 00:00 - 01:00 1.00 RIGU P 01:00 - 01:30 0.50 RIGU P 01:30 - 02:00 0.50 RIGU P 02:00 - 04:00 2.00 RIGU P 04:00 - 05:00 I 1.001 PULL I P 05:00 - 08:00 3.00 PULL P 08:00 - 10:00 2.00 PULL P 10:00 - 12:00 I 2.001 EVAL 12:00 - 14:30 I 2.50 I EVAL I P 15:30 - 21:00 5.50 BOPSUF-P 21:00 - 00:00 I 3.001 BOPSUR P 5/17/2007 00:00 - 01:00 1.00 BOPSU~ P 01:00 - 02:00 1.00 BOPSU P 02:00 - 05:30 3.50 BOPSU P 05:30 - 06:30 1.00 BOPSU~ N HMAN 06:30 - 07:30 1.00 BOPSU N HMAN 07:30 - 08:30 1.00 BOPSU~N HMAN 08:30 - 13:30 5.00 BOPSU N HMAN DECOMP Prepare rig for moving - Skid rig fioor from drlg position to move position DECOMP Trouble shoot steering problem - Move off Well MPH-14 - DECOMP Remove cellar doors - Heaters - Install back boosters DECOMP Repair rig moving / steering system - Right rear hinge DECOMP Move rig from MPH- Pad to MPS-01A DECOMP Remove rear boosters - Install glycol heaters, cellar doors - Remove front boosters - frame - Position rig on pad for crab walk - Turn tires to drive on mats DECOMP Move rig over MPS-01A DECOMP Shim rig DECOMP Skid rig ffoor from move position to drlg position DECOMP RU floor - Spot tiger tank - Rock washer - cuttings tank - BP's 110% tank for taking freeze protection - Berm rock washer, cuttings tank -(Accept rig @ 04:00 hrs 5/16/2007) DECOMP OA 140 psi - IA 0 psi - Tubing 0 psi - Take on seawater - PU Lubricator - Pull BPV - RD Lubricator DECOMP RU circulating lines - Con't taking on seawater DECOMP Displace diesel freeze protection - Pump 40 bbls seawater down Annulus - Reverse hoses - Pump 150 bbls down tubing - Wait 30 mins for diesel to migrate - Pump additional 50 bbls - GPM 210 to 340 - PP 740 to 1500 psi DECOMP Install TWC - Test from the top to 3500 - test good - Test from bottom 1000 psi - Test failed DECOMP Attemp to test TWC from bottom - Test failed - Pull TWC - Install new TWC - Test from bottom to 1000 psi - From iop to 3500 - 5 mins each test - Chart - RD test equipment DECOMP PJSM - ND FMC tree - Secure tree in cellar DECOMP NU BOP's - 3' spacer spool - DSA - Cut down drlg nipple to accomodate tall stack - Install same - Remove choke 2' hose extension - Attempt to MU choke hose - Unsuccessful DECOMP PJSM - ND stack - Remove 3' spacer spool - Remove DSA - NU BOP stack and adapter - Install 1' choke hose extension - MU Choke hose - Weld / extend drlg nipple - DECOMP MU choke to stack - Install riser - Hook up flow line DECOMP RU testing equipment DECOMP Test BOP's - Annular 250 low 3000 high - 5 mins each test - Top VBR's 2 7/8" X 5" 250 low 3000 high - 5 mins each test - Tested with 4" and 4 1/2" test joints - Choke manifold - HCR Choke / Kill - Manuai Choke / Kill - Upper / Lower IBOP - Floor safety valves - 250 low 3000 high 5 min each test - Perform Accumulator test - Test Blind rams 250 low 3000 high - All test witnessed by WSL - John Crisp with AOGCC waived witness of test - DECOMP RD testing equipment DECOMP PU lubricator - Close Annulus valve - RD lubricator - Town redirected BOP test to 4000 psi - Retest BOP's DECOMP RU testing equipment DECOMP Test BOP's - Annular 250 low 2500 high - 5 mins each test - Top VBR's 2 7/8" X 5" 250 low 4000 high - 5 mins each test - Tested with 4" and 4 1/2" test joints - Choke manifold - HCR Choke / Kili - Manual Choke / Kill - Upper / Lower IBOP - Floor safety valves - 250 low 4000 high 5 mins each test - Test Blind Printed: 6/11/2007 11:17:54 AM . ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 5/17/2007 08:30 - 13:30 5.00 BOPSU N HMAN DECOMP rams 250 low 4000 high - All test witnessed by WSL ' 13:30 - 14:00 0.50 BOPSU P DECOMP MU 1 joint Dp - Wash over TWC - Blow down Top Drive I 14:00 - 16:00 2.00 BOPSU P DECOMP PU lubricator - Close Annulus valve - Break off XO - MU XO I with rig tongs - MU lubricator to hanger - Pull TWC - RD j lubricator I 16:00 - 16:30 0.50 PULL P DECOMP MU DP and 2 XO's - Screw into hanger - BOLDS - Pull hanger to rig floor - MU T.D. 16:30 - 17:30 1.00 PULL P DECOMP Pump 40 bbls Safe Surf-O - Chase with 90 degree seawater - GPM 380 - PP 320 17:30 - 21:30 4.00 PULL P DECOMP PJSM - LD hanger - Landing joint - RU power tongs - LD 4 1/2" IBT 12.6# L-80 tubing - RD power tongs - Clear rig fioor -(Total joints laid down 88) 21:30 - 22:30 1.00 BOPSU P DECOMP Install test piug - RU test equipment - Test lower VBR's 3 12/" X 6" - 250 low 4000 high 5 mins each test - Record on chart - RD testing equipment - Pull test plug - Install wear ring ', 22:30 - 00:00 1.50 CLEAN P DECOMP Moblize BHA to rig floor - MU 6 1/8" bit - 7 5/8" casg scraper - I boot baskets - Bit sub - Jar - DCs ~ 5/18/2007 00:00 - 06:00 6.00 CLEAN P DECOMP RIH with 7 5/8" scraper - PU 4" dp 1 x 1 to 6566' I 06:00 - 07:30 1.50 CLEAN P DECOMP CBU - 3 X- GPM 380 - PP 1550 - Cut Drlg line 07:30 - 10:30 3.00 CLEAN P DECOMP POH from 6566' 10:30 - 11:00 0.50 CLEAN P DECOMP LD BHA - Clear rig floor - Left Bit - Scraper - 1 Boot basket in hole 11:00 - 13:00 2.00 EVAL P DECOMP RU SWS E-line 13:00 - 21:00 8.00 EVAL P DECOMP RIH with USIT / GR / CCL to 6500' 21:00 - 22:30 1.50 EVAL P DECOMP LD USIT, GR, CCL - MU Howco 7 5/8" CIBP 22:30 - 00:00 1.50 EVAL P DECOMP RIH set 7 5/8" Bridge plug @ 3320' - POH 5/19/2007 00:00 - 00:30 0.50 EVAL P DECOMP RD - LD SWS 00:30 - 02:00 0.00 EVAL P DECOMP RU testing equipment - Test Howco CIBP & 7 5/8" Casg to 3000 psi for 15 mins - RD testing equipment - Blow down choke / kill line 02:00 - 03:30 1.50 PULL P DECOMP Moblize BHA to rig floor - MU Baker 7 5/8" Multi-string cutter 03:30 - 04:00 0.50 PULL P DECOMP Attempt to RIH - Would not pass wear ring - Pull wear ring - ID 6.625 - OD of stablizer 6.6875 - Pull wear ring to con't trip in ' hole I 04:00 - 06:00 2.00 PULL P DECOMP RIH - to 3300' - Tag bridge plug f~ 3320 - Put 20K on plug 'i 06:00 - 07:00 1.00 PULL P DECOMP Locate 7 5/8" collars @ 3256' - PU 20' to 3236' - Cut 7 5/8" casg-RPM65-2to4KTQ-GPM250-PP 11501CP-350 FCP-PU85-S085-ROT85 07:00 - 07:30 0.50 PULL P DECOMP Locate 7 5/8" collar - 3055' - PU 15' to 3040' - Cut 7 5/8" casg - RPM65-2to4TQ-GPM250-PP11001CP-500FCP 07:30 - 08:00 0.50 PULL P DECOMP Close 7 5/8" casg rams - Open annulus valves - Circulate out diesel freeze protect - GPM 315 - PP 950 - Flow check 08:00 - 09:30 1.50 PULL P DECOMP POH - LD Multi string cutter assy 09:30 - 11:00 1.50 EVAL P DECOMP Install test plug - Change top rams to 7 5/8" - Test door seals to 250 low 2500 high 5 mins each test 11:00 - 11:30 0.50 PULL P DECOMP PU / MU 7 5/8" spear assy 11:30 - 12:30 1.00 PULL P DECOMP Spear hanger - PU 25K to set spear - Circulate 30 bbl from OA to clear migrated diesel - GPM 240 - PP 440 - BOLDS - Pull hanger to rig floor - PU 120K 12:30 - 13:00 0.50 PULL P DECOMP Pump Safe Surf-O pill surface to surface - 9.5 bpm - PP 130 13:00 - 14:00 1.00 PULL P DECOMP LD spear assy - Hanger - Pack-off 14:00 - 14:30 0.50 PULL P DECOMP RU to LD 7 5/8" casg 14:30 - 18:30 4.00 PULL P DECOMP POH LD 7 5/8" casg - Total laid down 73 joints + 28.96' cut Printed: 6/11/2007 17:17:54 AM ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 ~ ~ Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 5/19/2007 14:30 - 18:30 4.00 PULL P DECOMP 18:30 - 19:30 1.00 PULL P DECOMP 19:30 - 21:30 2.00 PULL P DECOMP 21:30 - 22:30 1.00 PULL P DECOMP 22:30 - 00:00 1.50 PULL P DECOMP 5/20/2007 00:00 - 01:00 1.00 PULL P DECOMP 01:00 - 02:00 1.00 PULL P DECOMP 02:00 - 03:00 1.00 PULL P DECOMP 03:00 - 04:30 1.50 PULL P DECOMP 04:30 - 07:00 I 2.501 BOPSUR P I I DECOMP 07:00 - 09:00 2.00 STCTPL P W EXIT 09:00 - 10:00 1.00 STCTPL P W EXIT 10:00 - 10:30 0.50 STCTPL P WEXIT 10:30 - 11:00 0.50 STCTPL P WEXIT 11:00 - 12:00 1.00 STCTPL P W EXIT 12:00 - 13:00 1.00 STCTPL P W EXIT 13:00 - 14:00 1.00 STCTPL P W EXIT 14:00 - 16:00 2.00 STCTPL P WEXIT 16:00 - 18:00 2.00 STCTPL P W EXIT 18:00 - 20:30 2.50 STCTPL P W EXIT 20:30 - 21:30 1.00 STCTPL P W EXIT 21:30 - 23:30 2.00 STCTPL P W EXIT 23:30 - 00:00 0.50 STCTPL P W EXIT 5/21/2007 00:00 - Of:00 1.00 STCTPL P WEXIT 01:00 - 01:30 0.50 STCTPL P W EXIT 01:30 - 03:00 1.50 STCTPL P W EXIT 03:00 - 04:30 1.50 STCTPL P W EXIT 04:30 - 06:00 1.50 STCTPL P W EXIT 06:00 - 07:00 1.00 STCTPL P W EXIT 07:00 - 08:00 1.00 STCTPL P W EXIT 08:00 - 08:30 I 0.50 I STCTP~ ~ P I I W EXIT 08:30 - 15:30 7.00 STCTPL P WEXIT ~ ~~~~ 15:30 - 18:00 2.50 STCTPL P W EXIT joint Load BHA - strap - Moblize fishing tools to rig floor PU / MU Spear assy RIH with spear from 327 to 3040' tag casg top Set grapple - Jar on casg - Jar up to 185 over string weight (280) - Work string up to 400K 305K over string weight - Casg free - Attempt to circulate - Packed off - Pull one stand to 3104' - Break circulation CBU - GPM 240 - PP 260 - Flow check POH from 3104' to 327' Stand back DC's - LD Spear assy RU casg tools - LD 7 5/8" casg - 4 total joints + 2 cut joints 12.9' & 21.9' Install test plug - RU testing equipment - Change 7 5/8" casg rams to VBR's 2 7/8" x 5" - Test rams to 250 low 4000 high 5 mins each test - Record on chart - RD testing equipment - Pull test plug - Install wear ring MU Muleshoe - RIH to 3300' - Wash to 3314' - Circulate - GPM 300 - PP 410 Give to Schlumberger with mule shoe ~ 3302' Pump 2 bbls fresh water Test lines to 2500 psi Pump 20 bbls fresh water 49 bbls Class "G" at 17 ppg - Yield 1.01 - 272 sxs Pump 3 bbis water Displace 20 bbls seawater - 5.5 bpm @ 430 Pull 7 stands to 2660' Instal~ wiper ball - Circulate surface to surface GPM 318 - PP 450 - 3 bbls contaminated cement back POH - Break off mule shoe MU Mule shoe - RIH 7 stands from derrick - Install wiper ball - Pump surface to surface - 10 bpm @ 200 psi - Rack back same - Break off mule shoe Lay down 6 3/4" and 4 3/4" DC's Change out saver sub on top drive PU 4" dp 1 X 1- from pipe shed Rack back 25 stands in derrick PU 4" dp 1 X 1- from pipe shed Rack back 15 stands in derrick Rack 4" DP in derrick PJSM - Moblize BHA to rig floor MU BHA - Bit - Motor - Float sub - Stablizer - MW D Up Load - MWD - Load Nukes Con't MU BHA - Flex Dc's - HWDp - Jars - HWDp RIH from 888' to 2660' Wash from 2660' to 2755' - Tag top of cement - GPM 450 - PP 1590-RPM50-TQ4K-CBU RU testing equipment - Test casg to 2000 psi for 15 mins - Record on chart - RD testing equipment Drill cement from 2755' to 3140' - RPM 50 to 60 - TQ 4 to 7K - WOB20-GPM450-PP 1640 -PUW 115-SOW 80-ROT 100 ~~ ~` C7 L 14 c~ to kick off - from 3140' to ~ Printed: 6/71/2007 11:17:54 AM ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 5/21 /2007 I 15:30 - 18:00 I 2.50 I STCTPL I P 18:00 - 18:30 0.50 STCTPL P 18:30 - 19:00 0.50 STCTPL P 19:00 - 19:30 0.50 STCTPL P 19:30 - 20:00 0.50 STCTPL P 20:00 - 23:00 I 3.00 I EVAL I P 23:00 - 00:00 I 1.00 I DRILL I P 5/22/2007 I 00:00 - 02:00 I 2.00 I DRILL I P 02:00 - 02:30 0.50 DRILL P 02:30 - 00:00 21.50 DRILL P 5/23/2007 I 00:00 - 00:30 I 0.501 DRILL I P 00:30 - 02:00 1.50 DRILL P 02:00 - 04:30 2.50 DRILL P 04:30 - 05:30 I 1.00 I DRILL I P 05:30 - 06:00 I 0.50 I DRILL I P 06:00 - 07:30 I 1.50 I DRILL I P Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 W EXIT W EXIT W EXIT W EXIT W EXIT W EXIT INT1 INTi INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 07:30 - 20:30 13.00 DRILL P INT1 20:30 - 22:30 2.00 DRILL N DFAL INTi 22:30 - 00:00 5/24/2007 00:00 - 02:30 1.50 DRILL N DFAL INTi 2.50 DRILL N DFAL INT1 02:30 - 03:30 1.001 DRILL I N I DFAL I INT1 03:30 - 05:30 2.00 DRILL N DFAL INT1 05:30 - 08:00 2.50 DRILL N DFAL INT1 08:00 - 09:00 1.00 DRILL N DFAL INT1 09:00 - 10:30 1.50 DRILL N DFAL INT1 10:30 - 11:30 1.00 DRILL N DFAL INT1 11:30 - 13:00 1.50 DRILL N DFAL INT1 13:00 - 14:30 1.50 DRILL P INTi drill to 3180 - Well side tracked - GPM 450 - PP 1640 - ROT 60 -TQ7K- CBU - GPM 450 - PP 1630 RPM 60 - TQ 5K Puli up to 3140 - Prepare pits for displacement PJSM - Displace seawater to LSND 8.8 ppg mud CBU 2 X- Clean well - GPM 300 to 500 - PP 695 to 1500 - RPM60-TQ5- RU testing equipment - Preform LOT - Mud weight 8.8 - MD 3150' - ND 2377' - Surface pressure 396 = EMW 12 ppg - RD testing equipment - Take SPR's - Blow down Directional Drill from 3180' to 3270' - WOB 10 - RPM 80 - TQ 6- -GPM450-PPon1270-off-PUW 115-SOW80-ROT100 Directional Drill from 3270' to 3435' - Increase in flow after - connection - Flow check - No Flow - Gas / Air breaking out of mud - Fluid level dropped 5' in drlg nipple in 15 mins CBU - C~3 drilling rate - Flow check well - Well static Directional Drill from 3435' to 5925'. 500 gpm - 2590psi on btm - - 2420 psi off btm - 80 RPM Torque on btm 9K off btm 6K - WOB 5k-25K. PU weight 150K SO weight 85K ROT weight 110K. Directional Drill from 5925' to 6001'. 500 gpm - 2590psi on btm _ - 2420 psi off btm - 80 RPM Torque on btm 9K off btm 6K - WOB 5k-25K. PU weight 150K SO weight 85K ROT weight 110K. Circulate bottoms up 2X. 500 gpm at 2450 psi. Rotated and reciprocated drill pipe 90'. Pumping out of hole with 500 gpm to casing shoe at 3140'. Hole tight from 5183'-5140' Circulate BU 3X at 3140'. Circulated large clay balls out of the hole. Casing clean. 500 gpm - 2070' 80 RPM at 5K torque. Blow down top drive. Monitor well . Lubricate Top Drive, Blocks and Crown. Ran back to bottom and washed last stand to bottom. No problems. Directional Drill from 6001' to 7238'. Unable to pump up - survey. MW D failed. 500 gpm - 3220 psi on btm - 3100 psi off btm - 80 RPM Torque on btm 10K off btm 8K - WOB 20K. PU weight 180K SO weight 85K ROT weight 115K. Circulated 2X bottoms up. 500 gpm at 3080 psi. Rotate and reciprocate pipe full stand. 80 rpm at 8K torque. Pump out of hole at 500 gpm to 5908'. Finished pumping out of the open hole to the casing shoe at 3140'. Hole in good shape. 500 gpm at 2060 psi. Circulate casing clean 500 gpm at 2060 psi. Rotated and reciprocated drill pipe while cleaning up casing. 80 RPM at 6K torque. Monitor well - well static. Pump slug and pull out of hote. Unload nukes and download MWD. Changed out pulser and made up new bit. Upload MWD. Surface test MWD 470 GPM At 1130 psi. Install nukes Ran in hole to 10-3/4" casing shoe at 3140'. Cut and slip drill line. Service Top drive. Printed: 6/11/2007 11:17:54 AM ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 5/24/2007 14:30 - 16:30 2.00 DRILL N DFAL INT1 Ran in hole with drilling assembly to bottom. Encounter tight spots at 4798', 5076', 5625', 6280', 6741'. Taking weight running in hole but with clean pick up. Appears to be pushing something downhole. Washed last stand to bottom. 16:30 - 00:00 7.50 DRILL P INT1 Directional Drill from 7238' to 7805'. 500 gpm - 3450 psi on btm .~ - 3300 psi off btm - 80 RPM Torque on btm 11 K off btm 10K - WOB 15K. PU weight 187K SO weight 85K ROT weight 120K. 5/25/2007 00:00 - 10:00 10.00 DRILL P INT1 Directional Drill 9 7/8" hole f/ 7805' to 8390' - GPM 500 - PP -~ 3450 on bttm / 3300 psi off - 80 RPM - Torque on bttm 11 K/ off bttm 10K - WOB 15K - PUWT 187K - SOWT 85K - ROWT 120k 10:00 - 13:00 3.00 DRILL P INT1 Circulate hole clean - GPM 500 - PP 3420 psi - R&R - 80 RPM 13:00 - 18:30 5.50 DRILL P INT1 Monitor well f/ flow (static) - Pump out of hole f/ 8390' to 3140' - GPM 450 - PP 3120 psi 18:30 - 19:30 1.00 DRILL P INT1 Condition mud / CBU x 1.5 - GPM 500 - PP 2040 psi - R&R - 80 RPM 19:30 - 21:30 2.00 DRILL P INT1 RIH f/ 3140' to 8390' - Precautionary wash last stand to bottom (no hole problems encountered) 21:30 - 00:00 2.50 DRILL P INT1 Circulate and condition hole clean 5/26/2007 00:00 - 01:00 1.00 DRILL P INT1 Cont. circulate well clean - GPM 500 - 3300 psi - R&R - 80 RPM 01:00 - 01:30 0.50 DRILL P INTi Monitor well f/ flow for 15 min. - Mud aired up 01:30 - 02:30 1.00 DRILL P INT1 Condition mud with defoamer / turn off surface mixing equipment - CBU x 1- GPM 500 - PP 3300 psi 02:30 - 08:30 6.00 DRILL P INTi Monitor well f/ 15 min. (well static) - Pump out of hole to shoe @ drill rate - GPM 480 - PP 3160 psi (no hole problems encountered) 08:30 - 09:00 0.50 DRILL P INT1 CBU X 1.5 @ shoe - GPM 500 - PP 2060 psi - RPM 80 09:00 - 09:30 0.50 DRILL P INT1 Check well f/ flow - Pump dry job - Blow down top drive 09:30 - 10:30 1.00 DRILL P INT1 POH w/ 4" drill pipe f/ 3140' to 875' 10:30 - 11:30 1.00 DRILL P INTi Rack back HWDP in derrick - Flex collars - PJSM 11:30 - 14:30 3.00 DRILL P INT1 Pull nuke sources - Download MWD 14:30 - 16:00 1.50 EVAL P INT1 LD MWD tools - Stabilizer - Motor - Bit - Clear rig floor 16:00 - 17:00 1.00 EVAL P INT1 Mobilize SWS MDT string tools to rig floor - PJSM w/ SWS and all rig crew 17:00 - 18:30 1.50 EVAL P INT1 MU SWS Drilt pipe conveyed MDT tools 18:30 - 20:00 1.50 EVAL P INT1 RIH w/ 4" drill pipe f/ 129' to 3140' 20:00 - 20:30 0.50 EVAL P INT1 PJSM w/ SWS - RU wireline sheaves in derrick 20:30 - 23:00 2.50 EVAL P INT1 Cont. RIH w/ 4" drill pipe f/ 3140' to 7030' (filled pipe every 20 stds) 23:00 - 00:00 1.00 EVAL P INT1 PJSM - RU side entry sub & wireline 5/27/2007 00:00 - 01:30 1.50 EVAL P INTi Break circ - RIH w/ latch head - Pump down DWCH w/ 220 gpm 460 psi - Observe pressure increase of 250 psi when latched - Function test tool - Secure W.L. to SES - Blow down T.D. 01:30 - 03:00 1.50 EVAL P INT1 RIH f/ 7030' to 7760' (btm of tool depth) - Correlate MWD & SWS Gamma data on depth - Test and calibrate tools - Position tool - Spot packer at 7755' - PUWT 155k - SOWT 85k 03:00 - 08:30 5.50 EVAL P INT1 Run open hole MDT's - Tool pressure stations f~ 7755' - 7951' - 7952 - 7958' - 7975' - 8009' - 8020' - 8019' - 8123' - 8124' - 8126'-8131'-8168'-8169' 08:30 - 13:30 5.00 EVAL P INT1 Move tool to OB Sample station ~ 8161.7' - 8126.5' - 8120' - Printed: 6/11/2007 11:17:54 AM ~ ! +~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 5/27/2007 08:30 - 13:30 5.00 EVAL P INT1 13:30 - 19:30 6.00 EVAL P INT1 19:30 - 23:00 3.50 EVAL P INTi 23:00 - 00:00 1.00 EVAL P INT1 5/28/2007 00:00 - 04:30 4.50 EVAL P INT1 04:30 - 07:30 3.00 EVAL P INTi 07:30 - 09:30 2.00 EVAL P INT1 09:30 - 10:30 1.00 INTi 10:30 - 12:00 1.50 EVAL P INT1 12:00 - 13:30 I 1.501 EVAL I P I I INT1 13:30 - 14:00 0.50 EVAL P INT1 14:00 - 17:30 3.50 EVAL P INT1 17:30 - 19:30 2.00 EVAL P INT1 19:30 - 20:30 1.00 CASE P INT1 20:30 - 21:30 1.00 CASE P INT1 21:30 - 23:30 2.00 CASE P INT1 23:30 - 00:00 0.50 CASE P INT1 5/29/2007 00:00 - 02:30 2.50 CASE P INT1 02:30 - 05:30 3.00 CASE P INT1 05:30 - 11:00 I 5.501 CASE I P I I INT1 11:00 - 11:30 0.50 CASE P INT1 11:30 - 12:00 0.50 CASE P INT1 12:00 - 12:30 0.50 CASE P INT1 12:30 - 13:00 0.50 CASE P INT1 13:00 - 14:00 1.00 CASE P INT1 14:00 - 14:30 0.50 CASE P INT1 14:30 - 15:30 1.00 CASE P INT1 15:30 - 18:30 3.00 CASE P INT1 18:30 - 21:00 2.50 CASE P INT1 21:00 - 00:00 3.00 CASE P INT1 5/30/2007 00:00 - 01:30 1.50 CASE P INT1 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 Set packer - Good seal - Failed sample recovery, possible screen plugging Move MDT tool to OA sample station @ 7946.3' - Set Packer - Good seal - Failed sample recovery Move MDT tool to OA sample station ~ 7953.5' - Switch to non-screen probe recovery - Two sample bottles recovered successfully Move MDT tool to OB sample station ~ 8126' Move MDT tool to OB sample station ~ 8126' - Three samples were filled C~ this station successfuliy (#2 sample bottle possibly did not seai properly) Move MDT tool to OB sample station @ 8167' - Several attempts - Failed sample recovery Move MDT tool - Take pressure readings ~ 7697.6' - 7697' - 7669' POH to side entry sub ~ 7030' Release wireline clamp f/ SES - Attempt to unlatch f/ tools unsuccessful - Loosen SES port - Slacked off on drill string / SES port lowered below rotary table - Circ ~ 2 BPM - PP 600 psi f/ 15 min. - Attempt to unlatch unsuccessful - Circ 5 BPM - PP 930 psi f/ 30 min. - Increased to 6 BPM - PP 1150 psi f/ 15 min. Shut down pumps - Pulled SES to rig floor - Attempt to unlatch - Successful Pull and spool wireline - LD Latch head - Side entry sub - RD SWS wireline sheaves - Clear rig floor Flow check well f/ 15 min. (static) - Pump dry job POH w/ 4" drill pipe f/ 7030' to 129' LD SWS MDT tool assy. PJSM - MU 9 7/8" cleanout assy. - Bit - Sub - Float sub - Flex collars - Jars - HWDP RIH w/ 4" drill f/ 733' to 3100' (till pipe every 20 stds) Cut and slip drilling line - Service top drive Cont. RIH w/ 4" drill pipe f/ 3100' to 4533' Cont. RIH w/ 4" drill pipe f/ 4533' to 8390'- Circ and condition mud - GPM 520 - PP 3000 psi - PUWT 185k - SOWT 90k - ROTW 125k - R&R - 100 RPM - Off bttm torque 10k Flow check well f/ 15 min. (static) - Pump out of hole f/ 8390' to the shoe ~ 3140' - GPM 500 - PP 2300 psi CBU x 1 C~1 casing shoe - GPM 520 - PP 2000 psi RIH 2 stands f/ 3140' to 3391 through kickoff section - Pulled back to shoe without pumping (Good) Check weli f/ flow f/ 15 min. (static) - Pump dry job POH w/ 4" drill pipe f/ 3140' to 734' LD BHA - HWDP - Flex collars - Stabilizer - XOs - Bit Clear rig floor of vendor tools Pull wear bushing - Install test plug Change top rams to 7 5/8" - Test 250 psi low / 2500 psi high - each test 5 min. RU casing equip. - Change out beli guide - Grabbers - Bales Run 7 5/8" BTC-M 29.7# casing to 1400' PJSM - RD Double stack tongs - Slips - RU torque turn Printed: 6/11/2007 11:17:54 AM ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 5/30/2007 00:00 - 01:30 1.50 CASE P INT1 equipment to run TCII - Calibrate same 01:30 - 04:30 3.00 CASE P INT1 Cont. Run 7 5/8" 29.7# L-80 - TCII f/ 1400' to 3140' (shoe) 04:30 - 05:30 1.00 CASE P INT1 Circ and condition mud @ 10 3/4" shoe - GPM 250 - PP 400 psi - PUWT 120k - SOWT 95k 06:00 - 06:30 0.50 CASE P INT1 Run 7 5/8" csg 29.7# L-80 TCII f/ 3140' to 4100' (calculated pipe displacement 4.34 bbls - Actual 1.0 bbl / Check surface pits / No problems found) 06:30 - 07:00 0.50 CASE P INT1 Monitor well - Break circulation - Slowly increased pump rate - Circulated and reciprocate 7/58" casing @ 4100' f/ 15 min. BPM 4- PP 320 psi (Obseroed slight losses ~ start of circulating) 07:00 - 10:30 3.50 CASE P INT1 Run 7 5/8" TCII casing slowly f/ 4100' to 5810' (Calculated displacement 18 bbis / Actual 13.5 bbls) 10:30 - 11:00 0.50 CASE P INT1 Break circulation - Increase pump rate - Circulate and reciprocate 7 5/8" casing - BPM 4- PP 410 - PUWT 175k - SOWT 105k 11:00 - 15:30 4.50 CASE P INT1 Cont. run 7 5/8" 29.7# L-80 TCII casing slowly f/ 5810' to 8339' - Washed down last casing joint - MU hanger / landing jt. - Washed to bttm ~ 8377' (Proper pipe displacement was obtained f/ 5810' to 8377' (Observed no tight hole throughout casing run) 15:30 - 17:00 1.50 CASE P INT1 Circulate and reciprocate 7 5/8" casing - BPM 6- PP 590 psi 17:00 - 17:30 0.50 CASE P INT1 LD franks fillup tool - Install cement head - Connect lines 17:30 - 20:00 2.50 CASE P INT1 Break Circulation - Condition mud f/ cement job - BPM 6- PP 470 psi - PUWT 257k - SOWT 105k (PJSM w/ SLB while circulating) 20:00 - 22:30 2.50 CEMT P INT1 Give to Schlumberger Pump 5 bbls water ahead Test lines to 3900 psi Pump 5 bbls water Pump 49.5 bbis Mud Push II C~ 11.0 ppg Pump 135.5 bbls class "G" cement ~ 15.8 ppg / yield 1.17 / 653 sxs Rig displaced 381 bbis LSND bbls mud ~ 9.5 ppg Reciprocated casing throughout Cementing and Displacement - PUWT 265k - SOWT 90k Bumped plug 3742 stks / 97% Eff. - CIP @ 2200 hrs. Increased pressure 3500 psi f/ 30 min. Bled off pressure - Floats held - 100% returns throughout cement job. 22:30 - 00:00 1.50 CASE P INT1 Disconnect lines - LD cement head - Landing jt. - Casing tools - Clear rig floor 5/31/2007 00:00 - 01:30 1.50 CASE P INT1 LD cement head - C/O Grabbers on top drive - C/O Bales 01:30 - 03:30 2.00 CASE P INT1 Mobilize BHA to rig floor - Back off LDS - Install Packoff - Set - RLDS - Test to 5000 psi f/ 10 min. (OK) 03:30 - 04:00 0.50 CASE P INT1 RU lines to 10 3/4" x 7 5/8" annulus - Pumped 30 bbls 9.2 ppg mud down annulus ~ 3 BPM - PP 710 psi injection rate - Blow down lines - RD same 04:00 - 05:30 1.50 CASE P INT1 PJSM - Change top rams to 2 7/8" x 5" VBRs - Rig up test equip. Test Top rams - 250 low / 4000 psi high f/ 5min each test - Record on chart 05:30 - 06:30 1.00 CASE P INTi RD test equipment - Install wear bushing 06:00 - 09:30 3.50 CASE P INT1 MU 6 3/4" Cleanout assy. - Bit - Scraper - Subs - Drill collars - Printed: 6/11/2007 11:17:50. AM • ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 5/31/2007 06:00 - 09:30 3.50 CASE P INT1 09:30 - 12:00 2.50 CASE P INT1 12:00 - 14:00 2.00 CASE P INT1 14:00 - 15:30 I 1.501 CASE I P I I INT1 15:30 - 19:00 I 3.501 CASE I P I I INT1 19:00 - 19:30 I 0.501 CASE I P I I INT1 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 19:30 - 20:00 0.50 STWHIP P WEXIT 20:00 - 20:30 0.50 STWHIP P WEXIT 20:30-21:00 0.50 STWHIP P WEXIT 21:00 - 00:00 3.00 BOPSU P W EXIT 6/1/2007 I 00:00 - 00:30 I 0.50 I BOPSUp P I I W EXIT 00:30 - 01:00 0.50 BOPSU P W EXIT 01:00 - 02:00 1.00 STWHIP P WEXIT 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 04:30 2.00 STWHIP P WEXIT 04:30 - 05:00 0.50 STWHIP P WEXIT 05:00 - 11:30 6.50 STWHIP P WEXIT 11:30 - 12:30 I 1.OOI STWHIPI P I I WEXIT 12:30-13:00 0.50 STWHIP P WEXIT 13:00 - 14:00 1.00 STWHIP P WEXIT 14:00 - 15:00 1.00 STWHIP P WEXIT 15:00 - 17:30 2.50 STWHIP P WEXIT 17:30 - 19:00 1.50 STWHIP P WEXIT 19:00-20:00 1.00 STWHIP P WEXIT 20:00 - 00:00 4.00 STW HIP P W EXIT 6/2/2007 100:00 - 05:00 I 5.001 STWHIPI P I I WEXIT HWDP - Jars - HWDP PU 4" drill pipe 1 x1 f/ pipe shed f/ 1209' to 3400' RIH w/ 4" drill pipe stands f/ 3400' to 8292' (Float collar @ 8292') Circulate hole clean - BPM 8- PP 2160 psi - PUWT 170k - SOWT 85k Observe well - Pump dry job - POH w/ 4" drili pipe f/ 8292' to 1209' Stand back in Derrick - HWDP - Drill collars (Diesel freeze protected 10 3!4" x 7 5/8" annulus - Little Red pumped 95 bbls - BPM 1- PP 900 psi) LD Bit - Scraper - Subs RU drain BOP stack - Pull wear bushing RU test equipment - Install test plug Test BOP's - Annular 250 low 3000 high - 5 mins each test - Top VBR's 2 7/8" X 5" - Lower VBRs 3 1/2" X 6" 250 low 3000 high - 5 mins each test - Tested with 4" test joint - Choke manifold - HCR Choke / Ki~l - Manual Choke / Kill - Upper / Lower IBOP - Floor safety valves - 250 low 3000 high 5 min each test - Cont. BOPE test - Performed Accumulator test - Test Blind rams 250 low 3000 high - All tests witnessed by WSL - Chuck Scheve with AOGCC waived witness of test RD test Equipment - Pull test plug Install wear bushing - Mobilize Baker tools to rig floor PJSM - Change out elevators and handling equip. MU Baker ZXP packer / liner hanger w/ Sperry LW D/ GR Surface test LW D- GPM 100 - PP 495 psi RIH w/ 4" drill pipe f/ 106' - Fill pipe, break circulation and test LWD every 10 stds Screw in T.D - Obtain parameters - Circulate w/ 130 gpm 900 psi - Locate "RA" tag w/ LWD at 7867.14' (2.77' high) - RIH and spot liner top at 7961' - Drop 1 3/4' ball Pump ball down w/ 3 bpm, 890 psi - Slow pumps to 1 bpm, 220 psi at 600 strokes - Seat ball w/ 653 stks. Pressure up to 1900 psi to set liner hanger - Slack off and put 40k down weight to ensure hanger set - Continue to pressure up to 2250 (set ZXP packer) - 2890 psi (release HRD) - 3525 psi to neutralize Push Tooi - Continue to pressure up to 3900 psi. - Close annular -Test casing and Liner top packer to 2000 psi f/ 5 min - Record on chart - Good test - PU to expose Rotating "Dog" sub above liner top - Set Dogs down on liner top w/ 40k - Rotate w/ 15 RPM and set down 40k - Pull above liner top - Liner top at 7961' - W LEG at 8053' CBU w/ 6 bpm, 890 psi - Flow check - Dry job - Blow down T.D. POH w/ 4" drili pipe f/ 7961' to 84' LD - Baker running tool - XOs - LW D- Clear rig floor PJSM - Mobilize Baker whipstock assy. to rig floor MU Whipstock assy. - Mill - String mills - HWDP - MWD - Initialize / upload MWD - Bumper sub - Drill collars - HWDP - Function test MWD - GPM 262 - PP 680 psi RIH w/ Baker whipstock assy. f/ 1190' to 6889' (fill pipe every 30 stds) Printed: 6/11/2007 11:17:54 AM ~ M Legal Well Name: MF'S-01 Common Weil Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 6/2/2007 05:00 - 06:00 06:00 - 06:30 06:30 - 07:30 _ 1.00 0.50 1.00 ~ STWHIP STWHIP STWHIP P P P WEXIT WEXIT WEXIT Slip and cut drilling line - Service top drive Cont. RIH w/ whipstock assembiy to 7850' Screw in T.D. - break circulation w/ 6 bpm 1300 psi - Obtain parameters - Orient whipstock face to 20 deg. Left of highside - Make connection - Check orientation - Set down on liner top at 7957' - Shear Bottom Trip Anchor w/ 12k down wt. - PU to 152k (10k over) to ensure anchor set - Slack off and shear mills from slide w/35k down wt. - PU to neutral position ~ 07:30 - 12:00 4.50 STWIiiP P WEXIT Obtain SPR - Begin milling window at 7923' w/ 80 RPM 1-2k WOB - 300 gpm 1800 psi - 10-12k torque @ 100 rpm - Mill window and drill open hole - Top of window at 7923' - Bottom of window at 7935' - Drill total of 29' to TD at 7952' 12:00 - 14:00 2.00 STWHIP P WEXIT Circ and pump sweeps around while working through window as per Baker rep. (assuring window was clear of inetal debris / cont. while preparing mud pits for displacement) - PUWT 142k - SOWT 95k - ROWT 115k - GPM 340 - PP 2210 psi - RPM 100 - TQ 9k 14:30 - 15:30 1.00 STWHIP P WEXIT PJSM - Displaced LSND as follows - 30 bbls Flo-vis spacer - 30 bbl water spacer - 30 bbls Flo-Pro spacer C~3 9.5 ppg, followed by New Flo-Pro NT @ 9.2 ppg - GPM 345 - PP 1900 psi (No problems encountered w/ displacement) - Flow check well (static) - Blow down T.D 15:30 - 17:30 2.00 STWHIP P WEXIT POH f/ 7952' to 1190' 17:30 - 19:30 2.00 STWHIP P WEXIT Stand back in derrick - HWDP - Drill collars - Download MWD 19:30 - 20:30 1.00 STWHIP P WEXIT LD Baker Whipstock milling assy. (Upper string mill in Gauge) - Clear rig floor 20:30 - 22:00 1.50 STWHIP P W EXIT Mobilize BHA to rig floor / Pull wear bushing - MU stack flusher - Flush stack - Function pipe rams - Install wear bushing 22:00 - 00:00 2.00 STWHIP P W EXIT MU 6 3/4" Directional BHA - Bit - Motor - Float sub - Stab - MWD / OM / RLL / Nukes / PWD / TM - Drill coliars 6/3/2007 ` 00:00 - 01:30 1.50 STWHIP P WEXIT Cont. MU BHA - Upload MWD - PJSM - Load Nuke tools - Drill collars - Jars - HWDP - Surface test MWD tools - GPM 248 - PP 1180 psi 01:30 - 04:30 3.00 STWHIP P WEXIT RIH w/ 4" drill pipe f/ 308' to 7820' (fili pipe every 25 stds) 04:30 - 05:30 1.00 STWHIP P WEXIT Screw in T.D - Break circ - Obtain parameters - GPM 258 - PP , 1900 psi - Correlate PWD and MWD ~ 60 / 80 RPM - TQ 11 to 12K - Orient BHA - Wash down fi 7820' to top window ~ 7923' - UPWT 145K - ROWT 120k - SOWT 100k - Shut down pump - Slide through window f/ 7923' to 7935' - Continue slide down to bttm @ 7952' -(No problems encountered going through window) - PWD baseline @ 10.58 ppg ECD 05:30 - 22:00 16.50 DRILL P PROD1 Directional Drill 6 3/4" hole f/ 7952' to 8535' (Dropped out bttm of OA sand) 22:00 - 00:00 2.00 DRILL P PROD1 Directional Drill 6 3/4" hole f/ 8535' to 8732' - UPWT 120k - SOWT 88k - ROWT 105k - GPM 262 - PP 2280 psi on / 2090 psioffbttm- W065k-TQ-Skon/2koffbttm-PWD~ 10.88 ppg ECD 6/4/2007 00:00 - 00:30 0.50 DRILL P PROD1 Directional Dritl 6 3/4" hole f/ 8732' to 8760' (Drilled back up into OA sand ~ 8760') 00:30 - 12:00 11.50 ORILL P PROD1 Directionai Drili 6 3/4" hole f/ 8760' to 9435' - PUWT 122k - SOWT 92k - ROWT 106k - GPM 270 - PP 2200 psi on / 2150 psi off bttm - RPM 80 - TQ 3k on / 4k off bttm - WOB 3-5k - PWD Q 10.92 ppg ECD Printed: 6/172007 11:17:54 AM ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 6/4/2007 12:00 - 17:30 5.50 DRILL P PROD1 17:30 - 00:00 6.50 DRILL P PROD1 6/5/2007 00:00 - 02:30 2.50 DRILL P PROD1 02:30 - 11:30 9.00 DRILL P PROD1 11:30 - 14:00 2.50 DRILL P PROD1 14:00 - 16:00 2.00 DRILL P PROD1 16:00 - 17:00 1.00 DRILL P PROD1 17:00 - 20:00 3.00 DRILL P PROD1 20:00 - 22:30 2.50 DRILL P PROD1 22:30 - 00:00 1.50 DRILL P PROD1 6/6/2007 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 03:30 2.50 DRILL P PROD1 03:30 - 04:30 1.00 DRILL P PROD1 04:30 - 08:00 3.50 DRILL P PROD1 08:00 - 11:00 3.00 DRILL P PROD1 11:00 - 12:00 1.00 DRILL P PROD1 12:00 - 15:00 3.00 DRILL P PROD1 15:00 - 17:30 2.50 DRILL N RREP PROD1 17:30 - 00:00 6.50 DRILL P PROD1 6/7/2007 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 02:00 1.00 DRILL P PROD1 02:00 - 03:30 I 1.501 DRILL I P ( I PROD1 03:30 - 04:00 I 0.50I DRILL I P I I PROD1 04:00 - 04:30 I 0.501 DRILL I P I I PROD1 Directional Drill 6 3/4" hole f/ 9435' to 9730' (Drilled out top of - OA sand ~ 9730') Directional Drill 6 3/4" hole f/ 9730 to 9960' - PUWT 125k - SOWT 86k - ROWT 105k - GPM 265 - PP 2270 psi on / 2190 psi off bttm - RPM 70 - TQ 4k on / 2k off bttm - PWD ~ 10.89 ppg ECD Directional Drill 6 3/4" hole f/ 9960' to 10016' (Drilled down back into OA sand C~ 10016") Directional Drill 6 3/4" hole f/ 10016' to 10,500' (6 3/4" TD) - GPM270-PP2310psi Circulate bottoms up 3X w/ 270 gpm, 1990 psi - R&R DP w/ 80 RPM, 3k torque - Flow check Pump out f/ 10,500' to Whipstock at 7935' - Stop pumps and pull above whipstock CBU 1X w/ 267 gpm, 1840 psi - Obtain parameters - No pump - PUW 130k, SOW 98k - Pumps on - PUW 122k, SOW 95k, ROTW 105 at 40 RPM - Tq 2k - Flow check - Pump dry job POH LD 93 jts 4" DP 1 x 1 to 4,967' RIH f/ 4,967' to top of whipstock ~ 7,923'. Orient motor and slide through window w/ pumps off. Cont. RIH to 10,500' (wash down last stand to bottom) Circulate 3x BU ~ 270 gpm, 2150 psi. Reciprocating and rotating ~ 80 rpm. Cont. circulating 3x BU ~ 270 gpm, 2150 psi Monitor well. Pump out of the hole f/ 10,500' to 7,900' Circulate hole clean above window. Monitor well. Pump dry job. Cont. POOH f/ 7,900' to BHA at 308' LD 2 jts. HWT, jars, flex DC's - PJSM on sources - Remove sources - Download MW D- LD MW D, motor & bit PJSM w/ Baker Rep. - RU power tongs, elevators, slips - Mobilize ECP equipment to rig floor MU ECP assembly: Float shoe - 2 Float collars - 2 jts 4-1/2" 12.6# L80 IBT tubing - XO -ECP -Pup jt & XO - 1 jt 4-1/2" 12.6# L80 IBT tubing - XO & pup jt - ECP - Running tool & XOs Repair iron roughneck RIH w/ ECP assembly f/ 202' to window ~ 7,923'. Fill pipe every 20 std. Break circulation at window. Check parameters: PUW 124 K, SOW 95 K. Cont. RIH f/ 7,923' to 8,649' Cont. RIH w/ ECP assembly f/ 8,649' to 10,068' Break down stand. PU 10' pup jt. RU Ts, valves, sensors and cement hose. Space out and position shoe at 10132', upper packer at 9,940'. Check PUK 184 K, SOW 90 K. Pump dart down and bumped in seat w/ 1100 psi. Shut down pump and waited for 1 hr to stabilize ECPs at bottom hole temperature. Pressure up to 1,650 psi and set bottom ECP. Inflate bottom ECP w/ 0.25 bbl. Pressure up to 2,800 psi and set upper ECP. Inflate upper ECP w/ 0.25 bbl. Pressure up to 3,730 psi and release running tool. Check PUW 130 K RD Ts, valves, sensors and cement hose. Break and LD pup joint Printed: 6/11/2007 11:17:54 AM ~ ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: sni2oo~ 6/8/2007 6/9/2007 MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/15/2007 Rig Release: 6/10/2007 Rig Number: 14 04:30 - 08:00 3.50 DRILL P PROD1 08:00 - 08:30 0.50 DRILL P PROD1 08:30 - 10:30 I 2.001 DRILL I P I I PROD1 10:30 - 12:00 I 1.50 ~ DRILL I P I I PRODi 12:00 - 15:00 I 3.001 DRILL I P I I PROD1 15:00 - 15:30 I 0.501 DRILL I P I I PROD1 15:30 - 17:00 1.50 DRILL P PROD1 17:00 - 20:30 3.50 DRILL P PROD1 20:30 - 23:00 2.50 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 00:00 - 01:00 I 1.001 CASE I P I I RUNPRD 01:00 - 03:30 I 2.501 CASE I P I I RUNPRD 03:30 - 04:00 0.50 CASE P RUNPRD 04:00 - 08:00 4.00 CASE P RUNPRD 08:00 - 10:30 I 2.50I CASE I P I I RUNPRD 10:30 - 12:00 I 1.50I CASE I P I I RUNPRD 12:00 - 15:00 I 3.001 CASE I P I I RUNPRD 15:00 - 17:00 2.00 CASE P RUNPRD 17:00 - 18:00 1.00 CASE P RUNPRD 18:00 - 21:00 3.00 CLEAN P CLEAN 21:00 - 23:00 2.00 CLEAN P CLEAN 23:00 - 00:00 1.00 CLEAN P CLEAN 00:00 - 05:30 5.50 CLEAN P CLEAN 05:30 - 06:00 0.50 RIGU P RUNCMP 06:00 - 09:00 3.00 RIGU P RUNCMP 09:00 - 11:00 I 2.001 RUN RUNCMP Spud Date: 3/25/2003 End: 6/10/2007 POOH w/ running tool f/ 9,938' to running tooi RD running tool, XOs and 2-7/8" handling tools. Mobilize whipstock retrieving hook assembly PU and MU whipstock retrieving BHA: Hook - XO - 1 jt 4" HWDP - Bumper sub - Jar - Float sub - MWD - XO - 9 4-3/4" DCs Slip and cut drilling line. Service top drive. Grease blocks and crown. RIH w/ whipstock retrieving BHA f/ 385' to 7,900'. Fill pipe every 25 stands Orient hook and check parameters: PUW 128 K, SOW 98 K. Latch whipstock and pull free w/ 80 K overpull Monitor well. Circulate BU. POOH f/ 7,900' to BHA. LD 4-3/4" DCs, MWD, Jars and whipstock Clear floor. Pull pulser from MW D. PU 6 jts 4" HWDP and rack in derrick RU to run 4-1/2" production liner: tongs, elevators, slips. Mobilize centralizers to rig floor MU 4-1/2" production liner assembly as per design (combination of slotted liner, solid liner and swell packers). MU hook wali hanger. RD casing equipment. Clear tloor and prepare to run DP RIH w/ 4-1/2" production liner on 4" DP f/ 2,009' to 6 3/4" window at 7923' - Obtain parameters - Bent joint through window w/ no issues - Continue run into open hole f/ 7923' to 9928' shoe depth (Hook Hanger 10' past bottom of window) - PUW 160k - SOW 100k PU to place Hook Hanger 30' above window - Turn pipe 1/4 turn and work through window - Repeat proccess until liner hooked in window - Set down 30k on hanger - PU 15' - Rehook hanger w/ 30k down - PU above window - Turn hanger 180 deg - Slack off 10' past window - PU above window - Re-orient and hook hanger in window w/ 35k down. Break connection - Drop 1 1/2" ball - Pump ball down w/ 3 bpm 500 psi - No indication of ball seating - Pump double DP volume - No Indication of seating - Drop 1 3/4" ball - Pump down - No seat - Work 3k Wlbs left hand torque down hole to shear off and release from liner - PU to ensure free - PUW 135k (25k less) - Top of liner at 7919' ~ Break circulation - Pump dry job - POH LD 30 jts HWT - LD 81 jts 4" DP Cont. POOH w/ remaining 4" DP standing back in derrick. Break and LD running tool. Clear rig floor MU mule shoe. RIH w/ 4" DP f/ surface to 7,918' Displace well to 9.3 ppg brine as per Mud Engineer procedure. POOH and LD 4" DP f/ 7,918' to 6,500' POOH and LD 4" DP f/ 6,500' to surface. Pull wear ring Load pipe shed w/ 197 jts 4 1/2" IBT tubing - RU tubing tongs & equipment - RU I-Wire spool - Mob 4 1/2" jewelry to rig floor PJSM - MU W LEG w/ X-nipple - Packer - Jet Pump gauge - Sliding Sleeve and Discharge Pressure Gauge - Connect Printed: 6/11/2007 11:17:54 AM ~ ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PS-01 M PS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 6/9/2007 09:00 - 11:00 2.00 RUNCO RUNCMP 11:00 - 12:30 1.50 RUNCO RUNCMP 12:30 - 13:30 1.00 RUNCO RREP RUNCMP 13:30 - 22:30 9.00 RUNCO RUNCMP 22:30 - 00:00 I 1.501 RUNCON'P I I RUNCMP 6/10/2007 00:00 - 01:00 1.00 RUNCO RUNCMP 01:00 - 02:30 1.50 BOPSU P RUNCMP 02:30 - 05:00 I 2.501 W HSUR I P I I RUNCMP 05:00 - 06:00 1.00 WHSUR P RUNCMP 06:00 - 08:00 2.00 WHSUR P RUNCMP 08:00 - 10:00 I 2.001 WHSUR I P I I RUNCMP 10:00 - 11:30 I 1.501 WHSUR I P I I RUNCMP 11:30 - 13:00 I 1.501 RIGD I P I I RUNCMP I-Wire and test same RIH w/ 4 1/2" 12.6# IBT tubing and I-wire to 1,000' Repair hose on pipe skate RIH w/ 4 1/2" 12.6# IBT tubing and I-wire f/ 1,000' to 7,510. Install X-nipple ~ 2,713'. Use a total of 95 ciamps on I-wire Install TWC in tubing hanger. MU hanger and landing jt. MU I-wire to penetrator. Land tubing hanger RILD. Test TWC from top to 2,500 psi. Blow down lines. Suck fluid out of BOP stack with rig vac. ND BOP. NU tree and adapter flange. Install termination sleeve on I-wire and perform conductivity test. Test tree and adapter flange to 4,000 psi. OK RU lubricator - Lines to annulus and tubing - Pull TWC Drop ball & rod - Allow to fall - Pressure up slowly on tubing • Observe shear at 3100 psi and 3700 psi - Continue to pressure up to 4200 psi - Hold pressure and record on chart for 30 min. - Good test - Bleed tubing back to 2500 psi - Pressure up on 7 5/8" x 4 1/2" annulus to 4000 psi - Hold pressure and chart for 30 min - Good test - Bleed tubing pressure - RP sheared w/ 2700 psi differential pressure - Bleed off all pressure RU Hot Oil truck to annulus - Pump 100 bbls diesel down .~_ annulus w/ 2.5 bpm, 1300 psi, taking returns through tubing - Hook annulus to tubing and allow to "U-Tube" for 1 hr RU lubricator - Install BPV - Test to 1000 psi from bottom - OK - RD lubricator and Hot Oil Secure tree. Prepare cellar and rig for release. Release rig C~3 13:00 6-10-07 Printed: 6/11/2007 11:t7:54 AM k~P E~4~'L~R~ATIi31~ ~ ~~ge 10~~~ ~€ . L~aI~~C~ff TeSt ~wn1r~l~r~i = Legal Name: MPS-01 Common Name: MPS-01 ° 1`es#.~~ ~=T+~s#-Typ~ ' D 7"es# L~e~a~~f~~"MC~) Te~st`~?~pth;~~} ;~U111~ ° Sur~~~~;Pre~~ur,e Leak 4~pre~sr~re~BHF~} EIV~f 3/29/2003 FIT 3,140.0 (ft) 2,381.0 (ft) 9.40 (ppg) 290 (psi) 1,453 {psi) 11.74 (ppg) 4/8/2003 FIT 8,170.0 (ft) 4,378.0 (ft) 9.50 (ppg) 345 (psi) 2,506 (psi) 11.02 (ppg) 10/16/2003 FIT 7,521.0 (ft) 4,225.0 (ft) 9.50 (ppg) 350 (psi) 2,435 (psi) 11.09 (ppg) 5/21/2007 LOT 3,150.0 (ft) 2,377.0 (ft) 8.80 (ppg) 250 (psi) 1,337 (psi) 10.82 (ppg) 5/21/2009 LOT 3,140.0 (ft) 2,377.0 (ft) 8.80 (ppg) 400 (psi) 1,487 (psi) 12.04 (ppg) 6/8/2007 LOT (ft) (ft) (ppg) (psi) (psi) 12.04 (ppg) • ~ Printed: 6/11/2007 11:17:49 AM ~ ~ Halliburton Company Survey Report C4mpany: ',B~' AmqcB Date; B/2$12007 T3me: i~a:39:~5 Page: '' ""1 ' ~3etdc !Milne Point Site: '(V~ P{ S Rad ~ C,~--o'~rdinate(NE) Reference: ' We1L• Ctrtl'S-01, Teue Nasth ~ertical tTVll} Reference: ' MPS-UfA: ~2.t} '; Weli: '~~MPS-Oi ~~; Seetion (V5) ~t~ference. '~ We11(t1.4~N,Q.Q(1Et~7.17Azij Wellpath: 'MPS-b1A Survey ~alculation M~fhod: -' Mirrimum CurvatUrO ' 1?b: Qr~Cke Survey MU ' Ineli A~im 3'YD ' Sys'~irB N/S E/W ;, '143ap.1~ ' MagE ' Tou1 ; ft de~ de~ ft fti .'' ' ft ft.', .. fiS ' ft 33.74 0.00 0.00 33.74 -38.30 0.00 0.00 6000044.65 566076.93 TIE LINE 119.54 0.63 171.85 119.54 47.50 -0.47 0.07 6000044.18 566077.00 KPR-SS 177.54 0.58 163.07 177.54 105.50 -1.06 0.20 6000043.59 566077.14 KPR-SS 244.54 0.81 118.40 244.53 172.49 -1.61 0.71 6000043.04 566077.66 KPR-SS 366.70 3.22 74.33 366.61 294.57 -1.10 4.78 6000043.60 566081.72 MWD+IFR+MS 456.21 4.59 68.02 455.91 383.87 0.92 10.52 6000045.67 566087.44 MWD+iFR+MS 546.30 6.40 56.70 545.59 473.55 5.03 18.06 6000049.84 566094.94 MWD+IFR+MS 637.07 8.69 45.27 635.57 563.53 12.63 27.16 6000057.52 566103.97 MWD+IFR+MS 727.02 11.68 40.49 724.09 652.05 24.34 37.90 6000069.33 566114.61 MWD+IFR+MS 822.40 15.71 42.41 816.74 744.70 41.23 52.89 6000086.34 566129.44 MWD+IFR+MS 914.91 17.35 48.25 905.43 833.39 59.66 71.63 6000104.94 566148.02 MWD+IFR+MS 1012.44 21.85 45.66 997.29 925.25 82.04 95.47 6000127.53 566171.66 MWD+IFR+MS 1104.89 25.47 46.90 1081.95 1009.91 107.66 122.30 6000153.37 566198.26 MWD+IFR+MS 1197.95 28.55 46.18 1164.85 1092.81 136.73 152.96 6000182.72 566228.66 MWD+IFR+MS 1291.66 30.90 48.87 1246.23 1174.19 168.07 187.25 6000214.36 566262.67 MWD+IFR+MS 1385.28 32.64 45.85 1325.83 1253.79 201.47 223.47 6000248.07 566298.59 MWD+IFR+MS 1480.18 34.93 44.31 1404.70 1332.66 238.75 260.82 6000285.67 566335.60 MWD+IFR+MS 1576.01 38.04 44.83 1481.74 1409.70 279.33 300.81 6000326.60 566375.23 MWD+IFR+MS 1669.75 37.70 46.63 1555.74 1483.70 319.50 342.01 6000367.13 566416.07 MWD+IFR+MS 1762.95 40.81 48.42 1627.90 1555.86 359.29 385.52 6000407.30 566459.22 MWD+IFR+MS 1858.36 41.52 52.44 1699.74 1627.70 399.26 433.92 6000447.70 566507.26 MWD+IFR+MS 1950.59 41.76 53.81 1768.67 1696.63 436.03 482.94 6000484.90 566555.95 MWD+IFR+MS 2042.93 43.75 54.46 1836.46 1764.42 472.75 533.74 6000522.06 566606.42 MWD+IFR+MS 2139.17 48.52 48.86 1903.16 1831.12 515.86 588.02 6000565.64 566660.31 MWD+IFR+MS 2230.69 52.41 52.57 1961.42 1889.38 560.48 642.67 6000610.74 566714.55 MWD+IFR+MS 2324.87 56.86 51.44 2015.92 1943.88 607.76 703.16 6000658.55 566774.62 MWD+IFR+MS 2417.42 59.35 52.38 2064.82 1992.78 656.22 765.00 6000707.55 566836.03 MWD+IFR+MS 2511.50 62.44 50.10 2110.58 2038.54 707.69 829.07 6000759.58 566899.63 MWD+IFR+MS Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2006 Well: MPS-01 Slot Name: Well Position: +N/-S 69.04 ft Northing: 6000044.65 R Latitude: 70 24 38.008 N +E/-W -267.49 ft Easting : 566076.93 ft Longitude: 149 27 43.011 W Position Uncertainty: 0.00 ft Wellpath: MPS-01A DrilledFrom: MPS-O1PB1 500292314101 Tie-on Depth: 3075.38 ft Current Datum: MPS-01 A: Height 72.04 ft Above System Datum: Mean Sea Level Magnetic Data: 5/25/2007 Declination: 23.60 deg Field Strength: 57635 nT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 33.74 0.00 0.00 57.17 Survey Program for Definitive Wellpath Date: 6/27/2007 Validated: No Version: 6 Actual From To Survey Toolcode Tool Name ft ft 119.54 244.54 MPS-01 Gyro (119.54-244.54) (0 KPR-SS SDC Keeper single shots 366.70 3075.38 MPS-01 P61 IIFR+MS+Sag (366.70- MWD+IFR+MS MWD + IFR + Multi Station 3145.00 8350.23 MPS-01A IIFR+MS+SAG (3145.00-8 MWD+IFR+MS MWD + IFR + Multi Station ~ ~ ~ Halliburton Company Survey Report Company~ '~~,6P Amoco Fietd: :Miln"e RCtint DaE~: 6128/20a7 Tinie: 1~:38;a5 Ca-arilinate(1vE) lieferenee: ' We)I: MP5-t~t, 7r~t~ '~a~e: 2. North Site: ' M Pt S Pad Verticat (TVI?) Beterence: ' M~'S-#}i,/k: 72.0 ! Wett: MPS-41' Section (VS} I2eference: ' Ytlell (t1:Qt7M1#,~?.tIQE,~7.1-7Azi} Wetlpath: 'MPS-01f1 SarVey CalculatitrnM~Wodc ' Minimum CurvafurE ' Db: C}racle Survey ' MI} Incl Atzim ' '~'YD '. 5ys TVI} 1~US FJW MapN i MapE Too1 : ' ft deg ', dec~ ft' ft 4f ft' ft ' ft 2605.58 63.87 53.43 2153.07 2089.03 759.62 895.00 6000812.08 566965.09 MWD+IFR+MS 2699.63 65.82 53.39 2193.05 2121.01 810.36 963.35 6000863.42 567032.98 MWD+IFR+MS 2791.87 67.89 54.84 2229.30 2157.26 860.06 1032.07 6000913.73 567101.25 MWD+IFR+MS 2885.60 67.04 47.00 2265.27 2193.23 914.57 1099.21 6000968.82 567167.91 MWD+IFR+MS 2980.64 65.09 45.85 2303.83 2231.79 974.44 1162.15 6001029.24 567230.30 MWD+IFR+MS 3075.38 65.18 52.24 2343.70 2271.66 1030.74 1227.02 6001086.11 567294.67 MWD+IFR+MS 3145.00 64.13 51.28 2373.50 2301.46 1069.68 1276.44 6001125.48 567343.73 MWD+IFR+MS 3206.12 63.33 50.41 2400.55 2328.51 1104.29 1318.94 6001160.46 567385.92 MWD+IFR+MS 3299.55 63.23 56.48 2442.59 2370.55 1153.96 1385.93 6001210.72 567452.47 MWD+IFR+MS 3394.26 65.70 53.68 2483.42 2411.38 1202.89 1455.98 6001260.26 567522.07 MWD+IFR+MS 3490.57 67.78 57.87 2521.47 2449.43 1252.61 1529.12 6001310.62 567594.77 MWD+IFR+MS 3585.64 70.23 57.50 2555.53 2483.49 1300.06 1604.13 6001358.73 567669.34 MWD+IFR+MS 3681.31 69.85 57.21 2588.19 2516.15 1348.57 1679.85 6001407.90 567744.62 MWD+IFR+MS 3775.45 69.91 57.62 2620.57 2548.53 1396.17 1754.33 6001456.16 567818.67 MWD+IFR+MS 3871.37 70.50 58.29 2653.05 2581.01 1444.06 1830.83 6001504.71 567894.74 MWD+IFR+MS 3966.83 68.83 58.52 2686.22 2614.18 1490.95 1907.07 6001552.27 567970.55 MWD+IFR+MS 4062.42 69.03 58.54 2720.59 2648.55 1537.52 1983.15 6001599.51 568046.21 MWD+IFR+MS 4156.49 68.59 58.62 2754.59 2682.55 1583.24 2057.99 6001645.89 568120.64 MWD+IFR+MS 4250.35 68.23 59.16 2789.13 2717.09 1628.34 2132.72 6001691.63 568194.96 MWD+IFR+MS 4345.98 68.75 58.55 2824.19 2752.15 1674.35 2208.86 6001738.32 568270.68 MWD+IFR+MS 4441.64 68.44 58.34 2859.11 2787.07 1720.96 2284.75 6001785.59 568346.15 MWD+IFR+MS 4539.07 68.64 5828 2894.75 2822.71 1768.59 2361.91 6001833.90 568422.88 MWD+IFR+MS 4634.17 68.31 58.61 2929.64 2857.60 1814.89 2437.30 6001880.86 568497.84 MWD+IFR+MS 4727.96 66.87 58.63 2965.40 2893.36 1860.04 2511.32 6001926.66 568571.46 MWD+IFR+MS 4823.35 67.02 57.99 3002.75 2930.71 1906.15 2586.00 6001973.42 568645.72 MWD+IFR+MS 4915.54 64.84 60.43 3040.36 2968.32 1949.24 2658.29 6002017.15 568717.62 MWD+IFR+MS 5009.39 65.67 60.13 3079.64 3007.60 1991.50 2732.31 6002060.05 568791.26 MWD+IFR+MS 5105.79 65.67 59.94 3119.36 3047.32 2035.37 2808.41 6002104.59 568866.96 MWD+IFR+MS 5201.99 64.82 60.56 3159.64 3087.60 2078.72 2884.25 6002148.61 568942.41 MWD+IFR+MS 5297.52 64.41 59.99 3200.59 3128.55 2121.51 2959.20 6002192.06 569016.97 MWD+IFR+MS 5392.24 66.65 59.56 3239.83 3167.79 2164.91 3033.69 6002236.11 569091.06 MWD+IFR+MS 5488.44 67.12 58.71 3277.59 3205.55 2210.30 3109.63 6002282.16 569166.59 MWD+IFR+MS 5583.32 67.30 59.65 3314.34 3242.30 2255.12 3184.75 6002327.64 569241.31 MWD+IFR+MS 5677.46 65.88 60.00 3351.75 3279.71 2298.54 3259.43 6002371.72 569315.59 MWD+IFR+MS 5771.22 66.97 59.21 3389.25 3317.21 2342.02 3333.55 6002415.85 569389.32 MWD+IFR+MS 5866.39 64.42 61.45 3428.42 3356.38 2384.96 3408.90 6002459.45 569464.27 MWD+IFR+MS 5958.77 64.77 60.24 3468.05 3396.01 2425.61 3481.77 6002500.74 569536.77 MWD+IFR+MS 6056.38 64.96 59.68 3509.51 3437.47 2469.85 3558.27 6002545.65 569612.87 MWD+IFR+MS 6151.37 64.64 62.27 3549.96 3477.92 2511.55 3633.41 6002588.01 569687.63 MWD+IFR+MS 6245.10 64.95 63.63 3589.88 3517.84 2550.12 3708.94 6002627.23 569762.81 MWD+IFR+MS 6339.28 64.67 65.38 3629.97 3557.93 2586.80 3785.86 6002664.59 569839.40 MWD+IFR+MS 6436.93 66.59 65.51 3670.26 3598.22 2623.76 3866.76 6002702.26 569919.96 MWD+IFR+MS 6532.99 65.74 62.30 3709.08 3637.04 2662.39 3945.66 6002741.59 569998.51 MWD+IFR+MS 6628.56 65.45 61.75 3748.57 3676.53 2703.22 4022.52 6002783.09 570075.00 MWD+IFR+MS 6722.41 66.77 62.17 3786.58 3714.54 2743.55 4098.26 6002824.09 570150.36 MWD+IFR+MS 6817.01 63.98 61.32 3825.99 3753.95 2784.25 4174.00 6002865.46 570225.74 MWD+IFR+MS 6912.31 64.56 60.30 3867.37 3795.33 2826.13 4248.95 6002907.98 570300.30 MWD+IFR+MS 7008.50 65.50 59.76 3907.97 3835.93 2869.69 4324.48 6002952.21 570375.45 MWD+IFR+MS 7103.52 66.00 60.14 3947.00 3874.96 2913.07 4399.47 600299625 570450.04 MWD+IFR+MS 7198.12 65.97 60.57 3985.50 3913.46 2955.81 4474.57 6003039.65 570524.76 MWD+IFR+MS 7292.69 65.03 60.96 4024.72 3952.68 2997.84 4549.67 6003082.33 570599.47 MWD+IFR+MS 7387.00 62.82 61.30 4066.17 3994.13 3038.74 4623.84 6003123.89 57067327 MWD+IFR+MS , • ~ ~ Halliburton Company Survey Report Survey 7481.72 62.30 60.89 4109.82 4037.78 3079.37 4697,43 6003165.16 570746.49 MWD+IFR+MS 7578.63 63.76 60.39 4153.77 4081.73 3121.72 4772.71 6003208.17 570821.38 MWD+IFR+MS 7673.26 64.95 60.73 4194.72 4122.68 3163.65 4847.00 6003250.75 570895.29 MWD+IFR+MS 7767.44 65.56 60.47 4234.14 4162.10 3205.63 4921.52 6003293.39 570969.43 MWD+IFR+MS 7860.56 67.21 60.37 4271.44 4199.40 3247.75 4995.71 6003336.16 571043.24 MWD+IFR+MS 7954.31 66.41 59.66 4308.36 4236.32 3290.82 5070.36 6003379.88 571117.49 MWD+IFR+MS 8048.57 67.21 59.17 4345.48 4273.44 3334.90 5144.94 6003424.62 571191.68 MWD+IFR+MS 8142.49 67.12 58.72 4381.93 4309.89 3379.56 5219.10 6003469.92 571265.43 MWD+IFR+MS 8235.56 64.74 60.75 4419.89 4347.85 3422.39 5292.47 6003513.40 571338.42 MWD+IFR+MS 8331.19 64.65 59.46 4460.76 4388.72 3465.48 5367.42 6003557.15 571412.98 MWD+IFR+MS 8350.23 64.47 58.99 4468.94 4396.90 3474.28 5382.20 6003566.07 571427.67 MWD+IFR+MS 8390.00 64.47 58.99 4486.08 4414.04 3492.76 5412.95 6003584.83 571458.26 PROJECTED to TD • • Client BP Exploration (Alaska), Inc. Well: MPS-01A Job #: AK 045 Field: ~~~~~~~~~~~~ Milne Point Date: 26 to 30 May 2007 Rig: Doyon-14 Summary Over the course of 26 to 30 May 2007, Schlumberger Wireline ran their Modular Formation Dynamics Tester (MDT) into well MPS-01A via drill pipe (TLC). The sampling program consisted of running one multi-sample module, which were comprised of five MDT Petroleum Sample Receptacles (MPSR). The primary objective of this logging run was to capture several high-quality pressurized hydrocarbon samples for PVT analysis. The first sampling point consisted of filling two MPSR (2876 and 2873) with a filtrate sample at 7,946.9 ft MD in the Schrader Bluff NB-sands. The second sampling point consisted of filling three MPSR (1398, 1320 and 2870) with a filtrate sample at 8,120.4 ft MD at the base of the Schrader Bluff OB-SBA5. Upon retrieval to surface, the sample chambers were transported back to the Schlumberger base in Prudhoe Bay, AK. Opening pressures were obtained on the five MPSRs prior to conducting their high-pressure transfers. All five MPSRs were heated for at least one hour each prior to transfer, of entire contents, into five Conventional Sample Bottles (CSBs). Upon completion of sample transfers all chambers were post-rinsed with Toluene in an effort to remove any residual heavy ends that could have irreversibly fallen out of solution prior to transfer. A 10% gas cap was introduced to the CSBs to facilitate safe transportation to analysis lab. The data in this report remains the property of the client and may not be disclosed or reproduced without the clienYs permission. OO 2005 Oilphase-DBR Sampling Services - Sampling Report (Field Test - Rev-01). • ~ Client BP Exploration (Alaska), lnc. We{I: MPS-01A ~~~~~~~~~~~~ Job #: AK 045 Field: Milne Point Date: 26 to 30 May 2007 Rig: Doyon-14 Sequence of Events ~:. ~._ ~,« , r~.. ~ u~.s_ ,~~.. ~ ~~ y.~ ~4~ ,.z . .~ } ' ~ ~... ,~~ ~~ ~. . :: .~__._ ~~. ~- ~>~ w 26-May-07 Began preparing sampling equipment for well MPS-01A Commenced priming five MPSRs Completed priming of MPSRs Loaded MPSRs into Muiti-Sample Module 27-May-07 Run MDT in hole via drill pipe (TLC) 21:19 Fire MPSR 2876 open 21:42 Fire MPSR 2876 closed capturing sampie at 7,946.9 ft MD 21:43 Fire MPSR 2873 open 22:04 Fire MPSR 2873 closed capturing samp4e at 7,946.9 ft AAD 28-May-07 1:38 Fire MPSR 1398 open 2:01 Fire MPSR 1398 closed capturing sample at 8,120.4 ft MD 2:02 Fire MPSR 1320 open 2:23 Fire MPSR 1320 closed capturing sample at 8,120.4 ft MD 2:27 Fire MPSR 2870 open 2:47 Fire MPSR 2870 closed capturing sample at 8,120.4 ft MD Pull MDT out of hole MDT at Surface Schlumberger equipment arrived back to base in Prudhoe Bay 29-May-07 15:53 Obtained opening pressure on MPSR 2876 (5,500 psig @ 67°F) 15:55 Commenced heating MPSR 2876 to 120°F 17:03 Commenced high-pressure transfer of MPSR 2876 (5,000 psig @ 120°F) 17:10 Completed high-pressure transfer of MPSR 2876 into CSB 7688-QA (sample 1.01) 19:24 Obtained opening pressure on MPSR 1398 (5,500 psig @ 69°F) 1926 Commenced heating MPSR 1398 to 120°F 20:33 Commenced high-pressure transfer of MPSR 1398 (5,000 psig @ 120°F) 20:40 Completed high-pressure transfer of MPSR 1398 into CSB 7719-QA (sampie 1.03) 30-May-07 9:48 Obtained opening pressure on MPSR 2873 (5,500 psig @ 69°F) 9:50 Commenced heating MPSR 2873 to 120°F 11:12 Commenced high-pressure transfer of MPSR 2873 (5,000 psig @ 120°F) 11:20 Completed high-pressure transfer of MPSR 2873 into CSB 7722-QA (sample 1.02) 13:14 Obtained opening pressure on MPSR 1320 (5,600 psig @ 70°F) 13:16 Commenced heating MPSR 1320 to 120°F 14:34 Commenced high-pressure transfer of MPSR 1320 (5,000 psig @ 120°F) 14:42 Completed high-pressure transfer of MPSR 1320 into CSB 7723-QA (sample 1.04) 15:10 Obtained opening pressure on MPSR 2870 (4,800 psig @ 70°F) 15:12 Commenced heating MPSR 2870 to 120°F 16:15 Commenced high-pressure transfer of MPSR 2870 (5,000 psig @ 120°F) 16:21 Completed high-pressure transfer of MPSR 2870 into CSB 7730-QA (sample 1.05) The data in this report remains the property of the client and may not be disclosed or reproduced without the clienYs permission. ~ 2005 Oilphase-DBR Sampling Services - Sampling Report (Field Test - Rev-01). Client: BP Exploration (Alaska), Inc. Well: MPS-01A ~~~~~~~~~~~~~ Job No: AK 045 Field: Milne Point Oate: 26 to 30 May 2~07 Rig: Doyon-14 OPEN-HOLE SAMPLE LISTING MDT Run No: 1 7,946.9 ft MD (TVD=4,309.2'-, Hydrostatic Press.=2,163.65 psia, Formation Press.=1,820.17 psia ~ 88.2°F • 1.01 27-May-07 21:19 MPSR Filtrate MPSR 2876 7,946.9 ft MD 5,500 @ 67°F 5,000 @ 120°F 500 @ 67°F 7688-QA CSB 380 cc Sample appears to be oil 1.02 27-May-07 21:43 MPSR Filtrate MPSR 2873 7,946.9 ft MD 5,500 @ 69°F 5,000 @ 120°F 600 @ 69°F 7722-QA CSB 400 cc Sample appears to be oil 8,120.4 ft MD (ND=4,377.39'), Hydrostatic Press.=2,288.58 psia, Formation Press.=1,980 psia ~ 88. 5°F 1.03 28-May-07 1:38 MPSR Filtrate MPSR 1398 8,120.4 ft MD 5,500 @ 69°F 5,000 @ 120°F 700 @ 69°F 7719-QA CSB 410 cc Sample appears to be oil 1.04 28-May-07 2:02 MPSR Filtrate MPSR 1320 8,120.4 ft MD 5,600 @ 70°F 5,000 @ 120°F 600 @ 70°F 7723-QA CSB 430 cc Sample appears to be oil 1.05 28-May-07 2:27 MPSR Filtrate MPSR 2870 8,120.4 ft MD 4,800 @ 70°F 5,000 @ 120°F 700 @ 69°F 7730-QA CSB 4300 cc Sample appears to be oil s The data in this repo~t remains the property of the client and may not be disclosed or reproduced without the clienYs permission. OO 2005 Oilphase-DBR Sampling Services - Sampling Report (Field Test - Rev-01). 3 BP Exploration (Alaskal, Inc. MDT Field Operations Report Job No: AK 045 Field: Milne Point Well: MPS-01A Date: 26 to 30 May 2007 Rig: Doyon-14 SAMPLING OPERATION PERSONNEL: Client Representative: Micaela Weeks Samson Ning MDT Personnel: John Shea Oilphase Personnel: Matthew Allen Date submitted: Approved by: Date: The data in this report remains the property of the client and may not be disclosed or reproduced without the clienYs permission. O 2005 Oilphase-DBR Sampling Services - Sampling Report (Field Test - Rev-01). + ~ • Client BP Exploration (Alaska), Inc. Well: MPS-01A Job #: AK 045 Field: ~~~~~~~~~~~~ Milne Point Date: 26 to 30 May 2007 Rig: Doyon-14 TABLE OF CONTENTS Summary ............................................................................. ~ Sequence of Events ..................................................................... 2 Sample Listing ............................................................................ s Chemical Rinse Listing ............................................................... a. The data in this report remains the property of the client and may not be disclosed or reproduced without the clienYs permission. OO 2005 Oilphase-DBR Sampling Services - Sampling Report (Field Test - Rev-01). ~~ 06/15/07 ~ ~ q ,1 ~ ,, Schlumb~rger N0. 4304 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 `~ < Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 ~~ / ~~~ / Attn: Christine MahnkE~n ATTN: Beth 333 West 7th Ave, SuitEr 100 Anchorage, AK 99501 Field: Prudhoe Bay Wall _Inh d! 1 nn rfe~erG..4:.,.. n~+e c~ r..~... rn P1-16 11637331 WARMBACKS & SBHPS 05104I07 1 P1-14 11637332 WAi2MBACKS & SBHPS OSl05107 1 01-05 11626486 USIT (CEMENT) 05/13107 1 01-05 11626486 USIT (CORROSION) 05/73107 1 MPH-14 11638633 INCLINOMETER-DIRECTION LOG 05/13/07 1 MPS-01A 1159454 MDT 05128/07 1 11-18 11626097 USIT 05126l07 1 09-15A 11629015 SCMT 06/01I07 1 12-12A 11695061 CEMENT IMAGE & BOND LOG 05/28107 1 03-36A 11629014 SCMT OS/31107 1 S-401 11626492 SCMT O6H1/07 1 rt~GMJG /ilif~IrVYYLCNVC RGVGIr 1 O1 JI171711YV NIYU RCI VRIYIIY~7 VIYC IiVYC CAliF1 IIJ: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Bivd. ~ ~"~ ~l ~'# t ~, i Anchorage, Alaska 99508 ,~ ,~1 ._,°' ~`~~~--:-~{ ~-~~j--~ °~' Date Delivered: _ e P 5.,, / `L'~'; ' , ~ ~y~ d~ a ~~~s ~ ~'°?~?~. ~sJ9~~~'Yfil~i~a`?~ ~ l~q -~~ ~P3"~~' ~~,~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth j . ~ .F Received by: ~,~~ Schlumb~rger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth weu ~~n ~e ~~ ~~~~~~~~~~~ e~~~~;~ 1. :~_ ~~Q~ ~ ~ ~~ ~ ~ ~~S ~~~~• ~~c~~~t~ai~~EC~r~ '~~ ~~~. ~°;~~~~1~!i'~'~~ Lna Descrintion NO. 4281 Company: State of Alaska Alaska Oil 8~ Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Fieid: Prudhoe Bay Date BL Color CD 06/06/07 05-22A, 71745219 MEMORY CBL 05/24107 1 09-1 & 11667116 USIT 04/09/07 1 F-09A 11657123 CBL 05/06/07 1 MPS-01A 11686746 USIT ~CORROSION) 05N8/07 1 MPS-01A 11686746 USIT (CEMENT) 05N8/07 1 MPF-99 11638629 SCMT 05/03107 1 J-12 11686735 RST 04l94/07 1 1 L1-i4 11421033 RST 10111/06 1 1 R-13 11686733 RST 04/11/07 1 1 J-19 11686738 RST 04/21/07 1 1 L2-33 11421034 RST 10/11/06 1 1 N-04A 11540226 RST 12111/06 1 1 15-05A 11054307 RST 07175105 1 1 PLEASE AGKNOWLEDGE REGEIPT BY SIGNING AND RETURNING ONE GOPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~U~ ^'~~/ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth Received by: ~ f ~ L_~ a~C Re: MPS-OlA Completion Thanks for the information Dave. I will place a copy of this note in the file. Nothing further is needed. Only request is please put the permit number in the title on messages. It helps filing. Call or message with any questions. Tom Maunder, PE ~'~~_~. ~ ~ ~-.~ AOGCC Johnson, David A. (Fairweather) wrote, On 6/6/2007 2:06 PM: Tom, MPS-01A drilled the OA lateral to 10500' MD (originally planned for 13455' MD). The last +/- 500' of the lateral is wet. We now paln to isolate the water with a ECP packer assembly and complete the well with a slotted liner. Swell packers will be run on the bottom of the liner to aid in further isolation. The brief procedure is as follows. 1) Run 2 Baker ECP's (space out ECP's with one blank joint in between). It will be necessary to fill pipe while running in hole. ~ 4-1/2" float shoe and two float collars baker-locked together o Two joints of 4-1/2" blank pipe. o Baker ECP Packer o One joint 4-1/2" blank pipe o Baker ECP Packer (set at 9950') o Baker running tool. Run two Volant centralizers with stop ring on each blank joint. 2) Position top ECP at 9940' MD and set packers. Shear off of tool. Circulate well clean. 3) Pull and retrieve whipstock 4) Run 4-1/2" slotted liner as follows and land hanger in window. 0 4-1/2" bull plug - plugged o One joint 4-1/2" blank pipe (bent) o One joint 4-1/2" blank pipe. o One Baker swell packer (water sensitive) - place at +/- 9800' o One joint 4-1/2" blank pipe. o One Baker swell packer (water sensitive) 0 4-1/2" blank pipe to +/-9650' ~ 4-1/2" slotted liner from 9650' to 8850' 1 of 2 6/6/2007 2:21 PM ~ • Re: MPS-OlA Completion i • ~ 4-1/2" blank pipe to +/-8750' ~ 2 Swell packers {oil sensitive - already on location) with two joints in between to be set in the interval 8650' to 8750' J 4-1/2" blank pipe to +/-8500' ~ 4-1/2" slotted liner from 8500' to 8000' ~ 4-1/2" blank pipe to window' J Baker Hookwall hanger Run two Volant centralizers with stop ring per joint. 5) Complete well with jet pump assembly per original program. Dave «Johnson, David A. (Fairweather) (john23 c~7r.BP.com).vcf» 2 of 2 6/6/2007 2:21 PM ~ ~ ' _ S~9RAW PAL/Pl, G011ERFIOR ~~~ ~~ ~~ 333 W. 7thAVENUE, SUITE 100 ~~~~~1~~7~~~~ ~~ ~~I~% aa s ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Kara Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPS-OlA BP Exploration (Alaska) Inc. Permit No: 207-034 Surface Location: 3375' FSL, 4714' FEL, SEC. 07, T12N, Rl lE, UM Bottomhole Location: 1594' FSL, 4511' FWL, SEC. 05, T12N, R11E, UM Dear Mr. Kara: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 2!0, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (90~59-3607 (pager). C DATED this ~day of March, 2007 0 cc: Department of Fish 8s Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ' ` STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work ^ Drill ~ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ~ Development Oil ^ Single Zone 1 c. Specify if well is propose nf 8[i~ ^ Coalbed Methane ^~3~i'~t~ ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well Bond No. 6194193 ~ 11. Well Name and Number: MPS-01A ~ 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: ~ MD 8448 ~ TVD 4509 12. Field / Pool(s): , Milne Point Unit / Schrader Bluff , 4a. Location of Welt (Governmental Section): Surface: 3375' FSL ~4714' FEL; SEC 07 T12N R11E UM f 7. Property Designation: ADL 380110 ~' , , , . , Top of Productive Horizon: 1418' FSL, 4822' FEL, SEC. 05, T12N, R11 E, UM + 8. Land Use Permit: 13. Approximate Spud Date: April 15, 2007 Total Depth: 1594' FSL, 4511' FEL, SEC. 05, T12N, R11 E, UM ~ 9. Acres in Property: 2560 14. Distance to Nearest Property: 3800' 4b. Location of Well (State Base Plane Coordinates): Surface: x-566077 y-6000045 Zone-ASP4 10. KB Elevation KBE = (Height above GL): 72,5~ feet 15. Distance to Nearest Well Within Pool: 1300' 16. Deviated Wells: Kickoff Depth: 3250 ~ feet Maximum Hole An le: 70 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1935 " Surface: 1498 ' i 'n f. Hole Casin Wei ht Grade Cou lin Len th MD N MD TVD includin sta e data 9-7/8" 7- /8" 29.7# 1~-gp TCII/BTC-M 8448~ urface urfa 844 ' 4 ' 703 sx la 'G' 19, PRESE NT 1IVECL CONDfTfON S UMMARY (To'be ~ripletetl for'R~irilt and Re-efltry Opeiations} ; Total Depth MD (ft): 10515 Totat Depth ND (ft): Plugs (measured): 4462 7090 Effective Depth MD (ft): 7200 Effective Depth ND (ft): 4072 Junk (measured): None sing Length ize ement olume Conductor / Structural 7g' 0" 260 sx Arctic S r x. 11 ' 112' Surface 3105' 10-3/4" 6 sx PF 'L' 275 sx lass 'G' 314 ' 2375' Intermediate 810 ' 7-5/8" 1 sx PF'E' 293 sx lass'G' 8139' 4377' Producti n Liner 2629' 4-1/2" Un ement d Slotted Lin r 78 '- 10514' 4347' - 4462' Perforation Depth MD (ft): None (Below Plugs) Perforation Depth TVD (ft): 1Vone 20. Attachments ~ Filing Fee, $100 ^ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Adrienne IwcVey, 564-4184 Printed Name Dan K Title Senior Driiling Engineer Prepared By Name/Number: Si nature ~- Phone 564-5667 Date Sondra Stewman, 564-4750 Commission Use Onf Permit To Drill Number: 07d~~3~ API Number: 50-029-23141-01-00 Permit Approval See cover letter for e: • • th rre irem n Conditions of Approval: _ / If box 'rs checked, well may not be used to explore for, test, or produce coalbed met~ ane s hydrates, or gas contained shales: L~~' Samples Req'd: ^ Yes Mud Log Req'd: ~Yes LU No HZS Measures: ^ Yes o Directional Survey Req'd: Yes ^ No Other. ~7~ ~ ~~ ~=~~ ~~/~~„ Q~ APPROV D BY THE COMMISSION Date , COMMISSIONER ~ECEIVEC~ ~3~~~~ MAR 0 9 2007 'ssion Form 10-401 Revised 12/2005 ~~~~~ ~ r~ Submit In DupliCate ~ N A L ~~~i ~ ~ ~,'~ ~°~ • ~ Milne Point Well MPS-01A Schrader OA Horizontal Producer Drilling and Comp/etion Plan Summary T pe of Well: Schrader Bluff OA Horizontal Producer Sul'face Location: 3,375' FSL and 4,714' FEL (AS BUllt) Section 7, T12N, R11 E UM E = 566,077' - N = 6,000,045' ' 9-7/8" Hole: Top OA t,418 FSL and 4,822' FEL Section 5, T12N, R11 E UM E= 571,205' N= 6,003,415' Z= 4,351' TVD 9-7/8" Hole Top OB 1,497' FSL and 4,683' FEL Section 5, T12N, R11 E UM E= 571,343' N= 6,003,495' Z= 4,422' TVD 9-7/8" Hole TD 1,595' FSL and 4,510` FEL Section 5, T12N, R11 E UM E= 571,515' N= 6,003,594' Z= 4,506' TVD 6-3/4" OA Lateral TD 975.2' FSL and 159.4' FEL Section 36, T13N, R10E UM E= 571,062' N= 6,008,250' Z= 4,413' TVD Distance to Pro ert line 3800' Distance to nearest well 1300' from MPE-29 Estimated Start Date: 15 A ril, 2007 TMD: 8,448 TVD: 4,509 Max Inc: 70.0° KOP: 3250' KBE: 72.5' Well Desi n: Conventional OA Horizontal Producer - Ob'ective: Schrader Bluff OA/OB - Maximum antici ated BHP: 1935 psi at 4,372' TVDss (OB Sand) Maximum surface ressure: 1498 psi (Based on a full column of gas at 0.1 psi/ft) Planned BOP Test ressure: 3000 psi ~ ~ Mud Program 9-7/8" Intermediate Hole (3,250' - 8,448'): LSND MD : Densi `PV ' YP H kP~ Filt~ate MBT 3270'-8256' 8.8-9.5 8-20 18-26 9.0-10.0 6-8 <25 8256' - 8446' 9.5 14 - 20 18 - 26 9.0 - 10.0 6- 8 < 25 6-3/4" Production Hole 8,056' -13,453' : LSND MD Densit PU '' YP ' ` H API Frltrate ' MBT 8056'-13453' 9A-9.3 10-16 22-28 9.0-9.5 6-8 <6 Casing/Tubing Program Hole Size Casing Size Wt/Ft Grade Conn Length Top MD Top TVD Bottom MD Bottom TVD 42 20* 92 H-40 Weld 112 0 0 112 112 13.5 10.75* 45.5 L-80 BTC 3140 0 0 3140 2375 9.875 7.625 29.7 L-80 TCII 7000 0 0 7000 3913 9.875 7.625 29.7 L-80 BTC-M 1448 7000 3913 8448 4509 6.75 4.5 12.6 L-80 IBT Slotted 5392 8063 4351 13455 4413 - 4.5 12.6 L-80 IBT-M 7960 0 0 7960 4309 * P re-set Cement Program Casin Size 7-5/8", 29.7#, L-80, TCII/BTC-M Production Casin Basis Tail cement = 500' MD above the TUZC. 40% excess over au e hole. Total Cement Volume: 146.0 bbl ~/ash 5 bbl water 10 bbl CW 100 S acer 50 bbl of MudPush Tail 146.0 bbl, 703 sx `G' mixed at 15.8 Ib/ al & 1.17 ft /sx Tem BHST =80°F from SOR 2 ~ ~ Evaluation Program 9-7/8" Section Open Hole: • DIR/GR/RES - • NEU/DEN ~ • I FR/CASAN D RA • InSite • M DT • IsoTubes Cased Hole: • GR/USIT/CCL PDC mode 6-3/4" Section Open Hole: • DIR/GR/RES ~ • PWD • NEU/DEN' • IFR/CASANDRA • InSite Formation Markers Formation To s TMD ft TVDss ft BHP si Surface Pressure Gradient si/ft EMW Ib/ al BPRF 1750 758 583 0.433 8.33 TUZC 6484 3642 1578 1214 0.433 8.33 U nu-MA 7062 3876 1679 1291 0.433 8.33 U nu-M61 7114 3897 1688 1298 0.433 8.33 U nu-M62 7242 3949 1711 1316 0.433 8.33 U nu-MC 7549 4073 1764 1357 0.433 8.33 SBF2-NA 7670 4122 1785 1373 0.433 8.33 SBF1-NB 7811 4179 1608 1190 0.385 7.40 SBE4-NC 7860 4199 1819 1399 0.433 8.33 SBE2-NE 7897 4214 1825 1404 0.433 8.33 SBE1-NF 7991 4252 1842 1417 0.433 8.33 TSBD-To OA 8055 4278 1893 1465 0.442 8.51 TSBC-Base OA 8166 4323 1913 1481 0.443 8.51 TSBB-To OB 8230 4349 1925 1490 0.443 8.51 SBA5 - Base OB 8288 4372 1935 1498 0.443 8.51 Recommended Bit Program Hole Size Depth (TMD) ; Footage Bit Type TFA GPM ' 9-7/8 3,270' - 8,446' 5,176' Hughes Christensen MXL-1X .50-.70 500-600 6-3/4 8,056' - 13,453' 5,397' Hycalog DTX613M .40-.50 200-300 ~ ,~~.n~ i ~ Well Control intermediate Hole • Maximum anticipated BHP: • Maximum surface pressure • Planned BOP test pressure • Integrity tests: Kick tolerance: • Planned completion fluid: ~ 1935 psi at 4,372' TVDss (OB Sand) 1498 psi (Based on a fuil column of gas at 0.1 psi/ft) 3,000 psi FIT to 12.5 Ib/gal 20' below the 10-3/4" shoe. 90 bbls with 9.3 Ib/gal mud at the 10-3/4" shoe. Kill weight brine (9.3 ppg) with diesel cap. Drilling Hazards & Contingencies Lost Circulation • Lost circulation is not reported as a major problem for S-Pad.` ~~ Expected Pressures ~ ?'~~~ • Standard pressure gradient (8.33 ppg) is expected through the Ugnu and the Schrader N ~D sands. The OA and OB sands are expected to have a pressure gradient of 8.5 ppg; however, 3-~~•°~ the most recent SBHP survey for the MPS-07i long string (OB sand) was 2,417 psi (11.6 ppg ~ EMW). it is highly unlikely that this pressure wiN be encountered, as S-07i is thought to be injecting into an isolated section of the OB sand, and the S-01 A wellbore is planned to penetrate the OB ~2100' away from S-07. Pad Data Sheet • Please Read the S-Pad Data Sheet thoroughly. Hydrocarbons • Hydrocarbons are possible in the Ugnu & Schrader Bluff intervals. ~~. Faults • There are no predicted fault crossings for this well. Hydrogen Sulfide • MPS Pad is not designated as an H2 S Pad. H2S detected from S-Pad wells: Well Name H2S Level Date of Readinq #1 Closest SHL Well H2S Level MPS-03 < 2 ppm May 2005 #2 Closest SHL Well H2S Level MPS-05 < 2 ppm May 2005 #3 Closest SHL Well H2S Level MPS-17 < 2 ppm May 2005 Max. Recorded H2S on Pad/Facility MPS-17 < 2 ppm May 2005 ~ Anti-collision Issues • MPS-01 A passes the Major Risk Criteria except for the MPS-01 original wellbore. This wellbore is abandoned. Distance to Nearest Property . • MPS-01A is planned to be 3800' from the nearest Milne Point property line. Distance to Nearest Well Within Pool • MPS-01A is 1300' from the nearest sand penetration (MPE-29). " 4 ~ ~ Procedure Summary Pre-Rig Operations 1. Perform outer annulus injectivity test to 2500 psi. 2. Perform PPPOT-IC to 3000 psi. 3. Install BPV. Drilling 4. MIRU. NU BOPE and test. ~/5. Pull 4-1/2" kill string from 3650' MD. ~~~ 6. RIH and set 7-5/8" bridge plug at 3319' MD. ~b 7. Make mechanical cut at 3237' (~100' below 10-3/4" shoe) in 7-5/8" casing. ~~1~~~~ 8. Circulate out OA freeze protect. Pull and lay down 7-5/8" casing. ~ 9. RIH w/ tubing stinger on DP and lay a 17.0 ppg cement plug from 7-5/8" stub to 200' .~~:~I_ ~A /1/A71 ___"__' _1___ /__a''___a__I _i ~/~ 1_I_1\ ' 10. Dress off cement and sidetrack well below 10-3/4" casing shoe. 11. Drill 9-7/8" hole as per directional plan to 8446' MD/4506' TVD (~150' below base ~, '~~`~` vc~~ 12 ~g~' ~ Run DPC MDT ~~Q~ . 13. . Cleanout run to condition hole for running casing. 14. Run and cement 7-5/8" casing (displace cement with seawater). ~ 15. RU E-line and run GR/USIT/CCL. ~~ 16. Set whipstock at ~8050' and mill window in 7-5/8" casing. While milling, displace seawater to 9.0 ppg drilling fluid. ,: 17. Drill 6-3/4" OA lateral as per directional plan to 13,453' MD/4413' TVD. 18. Retrieve whipstock. ~~~ ~3 19. Run 4-1/2" slotted liner (possibility of 4 swell packers with blank pipe isolation to " .~ • isolate water-swept zones) and hang off in 7-5/8 casing. 20. Displace drilling fluid to kill weight brine. 21. Run 4-1/2" jet pump completion. 22. Land tubing hanger and test. Test IA. 23. ND BOPE. NU and test tree. 24. Freeze protect inner annulus. I 25. RDMO. 5 r ~ ~J ~ ~' # ~ ~ BP EXPLORATION ~ ta~~ 9, ~, K~N;~. s M PS-01 A Field: Milne Point Schrader Bluff OA Horiz. Producer ENG: A. McVey Pad: s-Pad (ONLY MAINBORE SHOWN HERE) RIG: Doyon 14 RKB: 72.5' DIR / LWD OH DEPTH HOLE CASING Cement MWD LOGS FORM MD ND SIZE SPECS Slurry INFO 20" Conductor Wellhead Permafrost 92-Ib/ft H-40 FMC Gen 5 112' 112' 42 Welded, Insul 20" x 11" 5M Surface Csq (Pre-Set) 10-3/4" 45.5 Ib/ft Int. Yield 5210 psi Collapse 2480 psi Base Permafrost 2,016' 1,822' Drift - 9.794" Casing Point 3,140' 2,375' 65.5° 13-1/2" 70.0° (3520' - 4020') Intermediate Casin 0' - 7000': 7-5/8" Top of Cement 5,788' 3,433' 29.7 Ibs/ft DIR/GR/RES L-80, TCII TUZC 6,484' 3,715' Int. Yield 6890 psi NEU/DEN Collapse 4790 psi MDT Drift - 6.75" IFR/CASANDRA Cement Siurrv 146 bbl, 703 sx InSite 7000' - 8446': 15.8 ppg 7-5/8" 1.17 ft3/sx 29.7 Ibs/ft Top N sand 7,670' 4,195' L-80, BTC-M Int. Yield 6890 psi Collapse 4790 psi Drift - 6.75" Top OA sand 8,055' 4,351' Top OB sand 8,230' 4,422' 65.6° GR/USIT/CCL Test Csg to Ca in P int 446' 8 4 506' 9-7/8" 500' above TUZC 3500 psi g s o , , 3/7/2007 MPS-01A Well Plan Schematic.xls Tree: 4-1/16" - 5M FMC rig. KB elev. = 72.50' (Doyon 14) Wellhead: 11" x 4.5" 5M Ge M PS-01 A Proposed~ig. GL. elev.= 38.30' (Doyon 14) w/ 4.5" TCII T&B Tubing Ha~ 4" CIW "H" BPV profile 20" x 34" insulated, 215 #/ft A-53 80' Camco 4.5" x 1" w/ BK-5 latch 2485~ I sidepocket KGB-2 GLM (2100' TVD) 10 3/4" 45.5# L-80 BTC (Drift ID = 9.794, cap. _ .0961 bpf) 10 3/4" Super Seal II Float Shoe 3140' KOP below 10 3/4" shoe Max hole angle: 70° from 3520'-4020' 65.6° from 4218'-TD 4.5" 12.6# L-80 IBT-M tbg. (Drift ID =3.958, cap. _ .0152 bpf) Phoenix Discharge gauge (3.956" ID) 7842' I 4.5" HES XD Dura sliding sleeve (3.813" ID) 7853' Phoenix gauge sensor (3.833" ID) 7873' 4.5 HES X-Nipple (3.813" ID) 7889~ 7-5/8" x 4.5" Baker Premier Packer 7900~ 4.5" HES XN-Nipple (3.725" no-go ID) 7949~ I WLEG 7960' I Window in 7-5/8" csg @ -8060' Well angle @ window = 66° 7 5/8" 29.7# L-80 Casing 0-7000`:TCII 7000-8448':BTC-M ( drift ID = 6.750", cap. = 0.0459 bpf ) 8448~ DATE REV. BY COMMENTS 03/07/07 ALM Proposed Completion OA Lateral - 4 1/2" Slotted Liner 12.6# L-80 IBT MILNE POINT UNIT ~~LL ~-01 A Project: Milne Point ~~UMPANY DETAILS: BP Amucu WELL DETAILS: MPSUI Site: M Pt S Pad Calculatiun Methud: Minimum Curvxture Gruund Level: 38,}0 Well: MPS-01 ErtorSystem: ISCWSA Northing Easting Latitmde Scxn Methocl: Trav. CylindeiiNNtth 0.00 ~~~~N>~~'~.( 5 566076.93 70°?4'3R.IX11iN Wellbore: Plan MPS-01A Errur Surface: Ellipticnl Cunic Plan: MPS-01A WP 04 ~~'~"„"6 "^e~n~: R°ie' Ba~~ t~p ~ CASING DETAILS~~ No ND MD Name Size I I 12.10 I 12.10 20" Conducwr 20 2 2374.92 3140.11 10 3/4 10-3/4 ~ MD 3 45(~.42 8447.90 75/8" 7-5/8 I 3250.W ~ 327Q01 3 3520.01 HALLIBURTON 4 4020°' 5 4218.02 6 8280.86 Sperry Drilling Services ~ xzyzys H 8447.91i 2520 ` 10 3/4" 2800 3080 -{ I -{ LEGEND c ~ 3360 O O ~ a 3640 ~ ~ ~ 3920 a> > a~ ? 4200 H 4760 REFERENCEINFORMATION Co-ordinate (N/E) Reference: yyell MPS-01, True North Vertical (ND) Reference: 38 3~ 34 5,ii 72 60fl (38 3 ~ 3d 3) LongiNde Measured Depth Reference~ 3& 3+'s4 3~ 72.60h (38.3 t 34 3~ ~qq~p~qg,p ~~y Calculation Method: Minimum Curvature WELLBORE TARGET DETAILS (MAP C0.0RDINATES AND LAT/LONG) Na me ND +N/-S +E/-W Northing Easting Lati[ude Longttude Shape MPS01AT1 Rev1 a~14 76t 343350 5"s4S~'7 0003525.~D 57135500 70°25'1L756N 149°25'6.151W Circle~Ratlms t00.00~ ~14a 76~ 343350 53a517 6003525UO 57i39500 Circle(Radius~.100A01 SECTION DETAILS FORMATION TOP DETAILS No. NDPa~h MDPat~ Formation Ine Azi TVD +N/-S +E-W DLeg 7Face VSec Target t 1822.60 2021.63 BPRP 6634 48.58 2419.74 112315 135135 O.W O.W 1743.73 2 37t4.61 65~9.95 TUZC 66 68 49 37 2427J1 30 1135 136~ 19 4 W 65.W 1761.88 3 3948.61 7087.56 Ugnu-MA . . . . . 4 3969.61 7138.50 Ugnu-M61 70A2 56b0 252Q1W 1274.92 1550.64 3.0(1 65.W 199335 5 4021.61 7264.63 Ugnu-MB2 70.02 56b0 269Q91 1533b0 1942.93 0.00 O.W 246311 6 4145.61 7565.42 Ugno-MC 65.65 60.95 2765.63 1628.70 2099.61 3.W 138.05 2(r16.43 7 4194.61 768428 SBF2-NA 65b5 6495 444455 3425 86 5335 58 O W 00 6340.73 0 8 4251.61 7822.54 SBP1-NB 65.65 6039 4447.61 . 3433.50 . 5349.17 . 3.00 . -90.50 635630 MPS-0IATIRevl~copy) 9 4271.61 7871.06 SBE4-NC ip qygg.6i 7907.44 SBE2-NE fi5.65 6039 4509.46 3SOL02 5467.98 O.W Q00 (xt92.76 11 4324.61 7999,62 SBEi-NF 61 8062 69 TSBD T OA 12 4350 . . - Op 13 4395.61 8177.84 TSBC-Base 0A 14 4421.61 8234.91 TSB&Top OB 15 4444.61 8290.70 SBAS-Base OB Start Dir 4°/100' : 3250.01' MD, 2419.74'ND - Start Dir 3°/100' : 3270.01' MD, 2427.71'ND - - - - - - - End Dir : 3520.01' MD, 2520.04' ND ~ Start Dir 3°/100' : 4020.01' MD, 2690.91'ND ~ MPS-01, MPS-01P81, MPS-01PB7 V7 -~- MPS-01, MPS-01L2P81, MPS-01L2P81 VS ~ MPS-01, MPS-01L2, MPS-01L2 V5 MPS-01, MPS-01L1, MPS-01L1 V3 -~-- MPS-01, MPS-01, MPS-01 V4 $- MPS-01AWP04 ~ --- End Dir : 4218.03' MD, 2765.63' ND DD1=6.12 Start Dir 3°/100' : 8280.86' MD, 4440.55'ND End Dir : 8297.98' MD, 4447.61' ND TUZC......__ Total Depth : 8447.98' MD, 4509.46' ND "...~...~..""`..-... .~ ~ Ugnu-MA ................... , , Ugnu-MB1 .........................~~ ~'..._. Ugnu-M62....___._•_.__' ..................... "..._.__ Ugnu-MC-•_' .............'....'_'..._""......... ..._'_- 7 5/8„ SBF2-NA""_.'."'._...-__"•"...__'.'."" ............. \ ' SBF1-NB '•"""""'....'•"""""""""""•"""' ":' SBE4-NC .•..-.....-:'...'.•- ... - ' '- - . SBE2-NE' ~~ ~~ SBE1-NF~~ TSBD-Top OA•• • , 1, TSBC-Base OA II , ~'' ~,~ELe~ Q pA TSBB-Top OB , 'I~QSp1P PSO"~P~ SBAS-Base OB ~~\~ ~QS MPS-01 /MPS-01 L2 ~ MPS-0~1/MPS-01 L2PB1 ~~ ~~ ~ ~ ~ ~ . : s• , " .~ . MPS-01/MPS-0)' MPS-01/MPS-01 PB1 2800 3080 ~ 3360 m ~ m ~ 3640 v ~ m ~ 3920,i 4200 ~ aaso 1120 1400 1680 1960 2240 2520 2800 3080 3360 3640 3920 4200 4480 4760 5040 5320 5600 5880 6160 6440 6720 7000 7280 Vertical Section at 57.37° (700 ft/in) bp I HALLIBURTON +N~-g 0.00 Sper~y Drilling Servicss Project: Milne Point Site: M Pt S Pad Well: MPS-01 Wellbore: Plan MPS-01A Plan: MPS-01A WP 04 6600 G000 COMPANY DETAILS: BP Amixxu Calculxtion Me[hocl: Minimum Cun~a[ure N~~ 7'VD EfrorSy+tem: ISCWSA ~ II?.IU Scun Method: Trav. Cylinder Nurth z 237492 Error Surface: Elliptical Conic } 4509.42 Waming Methud: Rules Based WELLDETAILS: MPS-01 Ground L.evel: 3830 +g/-~y Nonhing Eas[ing latittude Lungi[uJe O.W 6lN1UU44.65 56607fi93 70°24'38AOSN 149°27'43.01 I W DDI= 6.12 CASING DETAfLS REFERENCE INFORMATION - Co-ordinate (N/E) Reference~ Well MPS-01, Tme North MD 10 I 12 Name ' 0 20" C d Size Vertical (NO) Reference' 383 + 34.3 @ 72.60ft (38.3 ~ 34.3) Measured Depth Reference~. 38.3 t 34.3 @ 72.60ft (383 i 34.3) . 314U.11 on ucwr 103/4" 10-3~4 CalculationMethod:MinimumCurvature fS~M17.90 7 5/8" ~-S'H . Sec 1 2 3 4 5 6 7 8 SECTION DETAILS MD Inc Azi ND +N/-5 +E/-W DLeg TFace VSec Target 3250.00 66.34 48.58 2419.74 112325 1351.35 0.00 0.00 1743.73 3270.01 66.68 49.37 2427.71 i135.30 1365.19 4.00 65.00 176L88 3520.01 70.02 56.60 2520.04 1274.92 1550.64 3.00 65.00 1993.35 4020.01 70.02 56.60 2690.91 1533.60 1942.93 0.00 0.00 246321 4218.02 65.65 60.95 2765.63 1628.70 2099.61 3.00 738.05 2646.43 8280.86 65.65 60.95 4440.55 3425.86 5335.58 0.00 0.00 6340.73 8297.98 65b5 60.39 4447.61 3433.50 5349.17 3.00 -90.50 6356.30 MPS-01ATiRev7 (wpy) 8447.98 65.65 60.39 4509.46 3501.02 5467.98 0.00 0.00 649276 'I WELLBORE TARGET DETAILS (MAP CO-ORDINATES) Name ND +N/-S +E/-W NoAhing Easling Shape MPS-01AT1Rev1 4447.61 3433.50 5349.17 6003525.00 571395.00 Circle(Radius:100.00) MPS-01A T1Rev1 (copy) 4447.61 3433.50 5349.17 6003525.00 571395.00 Circle (Radius: 100.00) LEGEND 4800 4200 •~ 3600 w 0 O ~ ~ 3000 ±. L ~ ~ 2400 ~ ~ ~ 1800 1200 600 ~ MPS-Ot, MPS-01P81, MPS-OtPB1 V7 -~ MPS-01, MPS-01LZPB1, MPS-01L2PB1 VS ~ MPS-Ot, MPS-01L2, MPS-O1L2 V5 ~ MPS-Ot, MPS-01L1, MPS-01L1 V3 ~ MPS-01, MPS-01, MPS-01 V4 -~ MPS-01A WP 04 0 20" ConducWr o~~y _ Mps ~~~MP~-~~,~ 6600 ~ ~S ______- ~ ,:,~~~ - - ~ - - Mps~~/,MP .1.~' ` S-oi 6000 0 ~C ~~v', - ' ~ . .1~i eti, 1:~i ~~ `s ` ~i~ 5400 5; •:~^ '~n ~i~ A J• ~ 4800 95% cont ~J SIPSUTAI~IRc~I ' ' /~ii 4200 ~ , o , y c , T ~ /-758" 3600 z 0 `~ . 7 a-~ t 'ro 3000 " ~ Tutal Uepth : ki447.98' MD, 4509A6' 7l'D " ~ ~ ~. ''~o End Dir : 8297.98' MD, 4447.61' TVD ~4~~~ ~ ,~ ~ ~ v ~ Sturt Dir 3"/l IXl' : 8280.86' MD, 4440.SS'ND ~o o .. . End Dir : 4218.03' MD, 2765b3' TVD 1800 ~-- -- 10 3/4" `'~o - Statt Dir 3"~ 1 W' : 4U20.01' MD, 2690.91 "f VD ~ --- ----------- 1200 ~ ~~' ~ - - - - _ _ End Dir : 3520.01' MD. 2520.(M' TVD `~S ~ ' ~ Start Dir }^/100' : 3270.01' MD. 2427.71'7'VD 600 O~ ~ ~, Start Dir 4"/ I W' : 3250.01' MD, 2419.74'7'VD 0 -3000 -2400 -1800 -1200 -600 0 600 IZ00 I800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800 8400 9000 9600 10200 West(-)/East(+) (1500 fi/in) ~ Halliburton Company ~ Planning Report - Geographic . .. .... .Sperry_EDM ,... _ ; L~iCQ~i~t~R~l~alrt~a Weil MPS-01 A , BP Amoco ; '[atC1 E~tl#i~C'enca: , : ' 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) Milne Point CI~~? ~ipt~[ux#:: ~! ` 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) M Pt S Pad + II~i4t~;~~~Ga' True , MPS-01 = $utYey;~k;ulatTi~riN~fe~Eh~t Minimum Curvature Plan MPS-01A MPS-01 A W P 04 ',Prc~+~t: Milne Point, North Slopea UNITED STATES , . .~ .:.. .. .:. ,.. ... i • ; Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Using geodetic scale factor _ Desig-l `. , .~ MPS-01A WP 04 , , _. . . Audit Notes: Version: 38 Phase: PLAN tie On Depth: 3,250.00 ~~rtical Section bepfih Fr4rni {T%/Dj +Nt 5 ~EI-W Dir!e~Cti~c~ . ~ , ~ ~~ ~ ~ ~ ~ (~) : : . ~ ~ ~ ° ~fE~ ~ ~ Z`) ., . ~ ~.~~ . s.. , . , : , 0.00 0.00 0.00 . . .., 57.37 3,250.00 66.34 48.58 2,419.74 1,123.25 1,351.35 0.00 0.00 0.00 0.00 3,270.01 66.68 49.37 2,427.71 1,135.30 1,365.19 4.00 1.70 3.95 65.00 3,520.01 70.02 56.60 2,520.04 1,274.92 1,550.64 3.00 1.33 2.89 65.00 4,Q20.Q1 70.02 56.60 2,690.91 1,533.60 1,942.93 0.00 0.00 0.00 0.00 4,218.02 65.65 60.95 2,765.63 1,628.70 2,099.61 3.00 -2.20 2.20 138.05 8,280.86 65.65 60.95 4,440.55 3,425.86 5,335.58 0.00 0.00 0.00 0.00 8,297.98 65.65 60.39 4,447.61 3,433.50 5,349.17 3.00 -0.02 -3.29 -90.50 8,447.98 65.65 60.39 4,509.46 3,501.02 5,467.98 0.00 0.00 0.00 0.00 3/fV2007 6:21:42PM Page 2 of 6 COMPASS 2003.11 Build 48 Well Position +N/-S 0.00 ft Northing: 6,000,044.65ft ~ Latitude: 70° 24' 38.008" N +E/-W 0.00 ft Easting: 566,076.93 ft ~ Longitude: 149° 27' 43.011" W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 38.30 ft ~ Halliburton Company ~ Planning Report - Geographic '(~t~tC~~s+~ ` .Sperry_EDM , , > i.OC~ ~a~'!i»~ R t-+~ ° ~, a . .. ..,<._.:, W ell MPS-01 ~O-~~t~C~ ' BP Amoco .. „'F1~p FtB~ce; ~ `. 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) P~?,~t: ; Milne Point ' ~IFF~:1#a~'er~rtwGB;;: ' ~ 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) ; $it~ '. ` i M Pt S Pad ~+t~srtl~ `R~'F+~nc~ . . ~ : , Troe tA~l ~ MPS-01 3~tnt~y;C~ik:t~iOrl~A~t~1dt1 `^ Minimum Curvature '11l-81#~'~r':. ~~~ ~Plan MPS-01A flaai~~n: . . ~ . ~ : ~~~MPS-01A WP 04 MPS-01 A W P 04 112.10 0.57 171.85 112.10 39.50 -0.38 0.05 6,000,044.27 - 566,076.99 - 0.00 -0.16 20" Conductor 2,021.63 43.11 53.92 1,822.60 1,750.00 465.82 516.55 6,000,514.98 566,589.29 2.27 686.20 BPRF 3,140.11 65.51 50.57 2,374.92 2,302.32 1,057.96 1,275.16 6,001,113.75 567,342.56 2.02 1,644.37 10 3/4" 3,250.00 66.34 48.58 2,419.74 2,347.14 1,123.25 1,351.35 6,001,179.70 567,418.16 1.82 1,743.73 Start Dir 4°/100' : 3250.01' MD, 2419.74'TVD ~ 3,270.01 66.6$ 49.37 2,427.71 2,355.11 1,135.30 1,365.19 6,001,191.87 567,431.89 4.00 1,761.88 Start Dir 3°/100' : 3270.01' MD, 2427.71'TVD 3,300.01 67.07 50.25 2,439.50 2,366.90 1,153.10 1,386.27 6,001,209.86 567,452.81 3.00 1,789.23 3,400.01 68.38 53.17 2,477.41 2,404.81 1,210.42 1,458.89 6,001,267.81 567,524.92 3.00 1,881.30 3,500.01 69.74 56.03 2,513.16 2,440.56 1,264.50 1,535.02 6,001,322.56 567,600.55 3.00 1,974.58 3,520.01 70.02 56.60 2,520.04 2,447.44 1,274.92 1,550.64 6,001,333.11 567,616.08 3.00 1,993.35 End Dir : 3520.01' MD, 2520.04' TVD 3,600.01 70.02 56.60 2,547.38 2,474.78 1,316.31 1,613.41 6,001,375.05 567,678.48 0.00 2,068.53 3,700.01 70.02 56.60 2,581.55 2,508.95 1,368.04 1,691.87 6,001,427.47 567,756.46 0.00 2,162.50 3,800.01 70.02 56.60 2,615.73 2,543.13 1,419.78 1,770.33 6,001,479.90 567,834.45 0.00 2,256.47 3,900.01 70.02 56.60 2,649.90 2,577.30 1,471.51 1,848.78 6,001,532.32 567,912.44 0.00 2,350.44 4,000.01 70.02 56.60 2,684.08 2,611.48 1,523.25 1,927.24 6,001,584.74 567,990.43 0.00 2,444.41 4,020.01 70.02 56.60 2,690.91 2,618.31 1,533.60 1,942.93 6,001,595.23 568,006.03 0.00 2,463.21 Start Dir 3°/100' : 4020.01' M D, 2690.91'TVD 4,100.01 68.24 58.33 2,719.41 2,646.81 1,573.80 2,005.94 6,001,635.98 568,068.67 3.00 2,537.95 4,200.01 66.05 60.55 2,758.26 2,685.66 1,620.67 2,085.27 6,001,683.54 568,147.57 3.00 2,630.02 4,218.02 65.65 60.95 2,765.63 2,693.03 1,628.70 2,099.61 6,001,691.70 568,161.84 3.00 2,646.43 End Dir : 4218.03' MD, 2765.63' TVD 4,300.01 65.65 60.95 2,799.43 2,726.83 1,664.96 2,164.91 6,001,728.54 568,226.81 0.00 2,720.98 4,400.01 65.65 60.95 2,840.65 2,768.05 1,709.20 2,244.56 6,001,773.47 568,306.06 0.00 2,811.91 4,500.01 65.65 60.95 2,881.88 2,809.28 1,753.43 2,324.20 6,001,818.40 568,385.31 0.00 2,902.84 4,600.01 65.65 60.95 2,923.11 2,850.51 1,797.67 2,403.85 6,001,863.34 568,464.55 0.00 2,993.77 4,700.01 65.65 60.95 2,964.33 2,891.73 1,841.90 2,483.50 6,001,908.27 568,543.80 0.00 3,084.70 4,800.01 65.65 60.95 3,005.56 2,932.96 1,886.14 2,563.15 6,001,953.20 568,623.04 0.00 3,175.63 4,900.01 65.65 60.95 3,046.78 2,974.18 1,930.37 2,642.80 6,001,998.14 568,702.29 0.00 3,266.56 5,000.01 65.65 60.95 3,088.01 3,015.41 1,974.60 2,722.45 6,002,043.07 568,781.54 0.00 3,357.49 5,100.01 65.65 60.95 3,129.23 3,056.63 2,018.84 2,802.09 6,002,088.00 568,860.78 0.00 3,448.42 5,200.01 65.65 60.95 3,170.46 3,097.86 2,063.07 2,881.74 6,002,132.93 568,940.03 0.00 3,539.34 5,300.01 65.65 60.95 3,211.68 3,139.08 2,107.31 2,961.39 6,002,177.87 569,019.27 0.00 3,630.27 5,400.01 65.65 60.95 3,252.91 3,180.31 2,151.54 3,041.04 6,002,222.80 569,098.52 0.00 3,721.20 5,500.01 65.65 60.95 3,294.14 3,221.54 2,195.77 3,120.69 6,002,267.73 569,177.77 0.00 3,812.13 5,600.01 65.65 60.95 3,335.36 3,262.76 2,240.01 3,200.33 6,002,312.67 569,257.01 0.00 3,903.06 5,700.01 65.65 60.95 3,376.59 3,303.99 2,2&4.24 3,279.98 6,002,357.60 569,336.26 0.00 3,993.99 5,800.01 65.65 60.95 3,417.81 3,345.21 2,328.48 3,359.63 6,002,402:53 569,415.50 0.00 4,084.92 5,900.01 65.65 60.95 3,459.04 3,386.44 2,372.71 3,439.28 6,002,447.46 569,494.75 0.00 4,175.85 6,000.01 65.65 60.95 3,500.26 3,427.66 2,416.95 3,518.93 6,002,492.40 569,574.00 0.00 4,266.78 6,100.01 65.65 60.95 3,541.49 3,468.89 2,461.18 3,598.58 6,002,537.33 569,653.24 0.00 4,357.71 6,200.01 65.65 60.95 3,582.71 3,510.11 2,505.41 3,678.22 6,002,582.26 569,732.49 0.00 4,448.64 3/&/2007 6:21:42PM Page 3 of 6 COMPASS 2003.11 Build 48 ~ ~ Halliburton Company ~ Planning Report - Geographic ~, ,, , , ; ;. .Sperry_EDM ..., .... . ,,. ._. t~b~ G6-~tit~li~ate:i~ . ; ~. .,, WeII MPS-01 C~ttnt~Y , . ~ ~. ~~ BP Amoco ; '[1t~ R~#8r"et~Ce~ ~ . ~.~::' 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) #~t+crjeCt Milne Pant ; :#1'3 ~fgt'~r1c~s: ; !: . 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) ;$~it~ ' M Pf S Pad N~rt~ #te#~nce True ;Vl~elt °'MPS-01 StN~v~ay!Ga(ctil~tit»t.1A~th~ ; Minimum Curvature W~Ibbr`~b . , . Plan MPS-01A .... i ' : _ , . : p~si~p: , . '' MPS-01 A W P 04 MPS-01A WP 04 6,300.01 65.65 60.95 3,623.94 3,551.34 2,549.65 3,757.87 6,002,627.19 569,811.73 0.00 4,539.56 6,400.01 65.65 60.95 3,665.16 3,592.56 2,593.88 3,837.52 6,002,672.13 569,890.98 0.00 4,630.49 6,500.01 65.65 60.95 3,706.39 3,633.79 2,638.12 3,917.17 6,002,717.06 569,970.23 0.00 4,721.42 6,519.95 65.65 60.95 3,714.61 3,642.01 2,646.93 3,933.04 6,002,726.02 569,986.02 0.00 4,739.55 TUZC 6,600.01 65.65 60.95 3,747.62 3,675.02 2,682.35 3,996.82 6,002,761.99 570,049.47 0.00 4,812.35 6,700.01 65.65 60.95 3,788.84 3,716.24 2,726.58 4,076.46 6,002,806.93 570,128.72 0.00 4,903.28 6,800.01 65.65 60.95 3,830.07 3,757.47 2,770.82 4,156.11 6,002,851.86 570,207.96 0.00 4,994.21 6,900.01 65.65 60.95 3,871.29 3,798.69 2,815.05 4,235.76 6,002,896.79 570,287.21 0.00 5,085.14 7,000.01 65.65 60.95 3,912.52 3,839.92 2,859.29 4,315.41 6,002,941.72 570,366.46 0.00 5,176.07 7,087.56 65.65 60.95 3,948.61 3,876.01 2,898.01 4,385.14 6,002,981.06 570,435.83 0.00 5,255.67 Ugnu-MA 7,100.01 65.65 60.95 3,953.74 3,881.14 2,903.52 4,395.06 6,002,986.66 570,445.70 0.00 5,267.00 7,138.50 65.65 60.95 3,969.61 3,897.01 2,920.54 4,425.71 6,003,003.95 570,476.20 0.00 5,301.99 Ugnu-M61 7,200.01 65.65 60.95 3,994.97 3,922.37 2,947.76 4,474.71 6,003,031.59 570,524.95 0.00 5,357.93 7,264.63 65.65 60.95 4,021.61 3,949.01 2,976.34 4,526.17 6,003,060.62 570,576.16 0.00 5,416.68 Ugnu-M B2 7,300.01 65.65 60.95 4,036.19 3,963.59 2,991.99 4,554.35 6,003,076.52 570,604.19 0.00 5,448.86 7,400.01 65.65 60.95 4,077.42 4,004.82 3,036.22 4,634.00 6,003,121.46 570,683.44 0.00 5,539.78 7,500.02 65.65 60.95 4,118.65 4,046.05 3,080.46 4,713.65 6,003,166.39 570,762.69 0.00 5,630.71 7,565.42 65.65 60.95 4,145.61 4,073.01 3,109.39 4,765.74 6,003,195.78 570,814.52 0.00 5,690.18 Ugnu-MC 7,600.02 65.65 60.95 4,159.87 4,087.27 3,124.69 4,793.30 6,003,211.32 570,841.93 0.00 5,721.64 7,684.28 65.65 60.95 4,194.61 4,122.01 3,161.97 4,860.41 6,003,249.18 570,908.71 0.00 5,798.26 SBF2-NA 7,700.02 65.65 60.95 4,201.10 4,128.50 3,168.93 4,872.95 6,003,256.25 570,921.18 0.00 5,812.57 7,800.02 65.65 60.95 4,242.32 4,169.72 3,213.16 4,952.59 6,003,301.19 571,000.42 0.00 5,903.50 7,822.54 65.65 60.95 4,251.61 4,179.01 3,223.13 4,970.54 6,003,311.31 571,018.28 0.00 5,923.98 SBF1-NB 7,871.06 65.65 60.95 4,271.61 4,199.01 3,244.59 5,009.18 6,003,333.11 571,056.72 0.00 5,968.10 SBE4-NC 7,900.02 65.65 60.95 4,283.55 4,210.95 3,257.40 5,032.24 6,003,346.12 571,079.67 0.00 5,994.43 7,907.44 65.65 60.95 4,286.61 4,214.01 3,260.68 5,038.16 6,003,349.46 571,085.56 0.00 6,001.18 SBE2-NE 7,999.62 65.65 60.95 4,324.61 4,252.01 3,301.45 5,111.57 6,003,390.87 571,158.60 0.00 6,085.00 SBE1-NF 8,000.02 65.65 60.95 4,324.77 4,252.17 3,301.63 5,111.89 6,003,391.05 571,158.92 0.00 6,085.36 8,062.69 65.65 60.95 4,350.61 4,278.01 3,329.35 5,161.81 6,003,419.21 571,208.58 0.00 6,142.34 TSBD-Top OA 8,100.02 65.65 60.95 4,366.00 4,293.40 3,345.86 5,191.54 6,003,435.98 571,238.16 0.00 6,176.29 8,171.84 65.65 60.95 4,395.61 4,323.01 3,377.63 5,248.75 6,003,468.26 571,295.08 0.00 6,241.60 TSBC-Base OA 8,200.02 65.65 60.95 4,407.22 4,334.62 3,390.10 5,271.19 6,003,480.92 571,317.41 0.00 6,267.22 3/6/2007 6:21:42PM Page 4 of 6 COMPASS 2003.11 Build 48 MPS-01A WP 04 8,234.91 65.65 60.95 4,421.61 4,349.01 3,405.53 5,298.98 6,003,496.60 571,345.06 0.00 6,298.95 TSBB-Top OB 8,280.86 65.65 60.95 4,440.55 4,367.95 3,425.86 5,335.58 6,003,517.24 571,381.48 0.00 6,340.73 Start Dir 3°/100' : 8280.86' MD, 4440.55'TVD 8,290.70 65.65 60.63 4,444.61 4,372.01 3,430.23 5,343.40 6,003,521.69 571,389.26 3.00 6,349.68 SBAS-Base OB 8,297.98 65.65 60.39 4,447.61 4,375.01 3,433.50 5,349.17 6,003,525.00 571,395.00 3.00 6,356.30 End Dir : 8297.98' M D, 4447.61' TVD - MPS-01A T1 Rev1 (co py) - M PS-01 A T1 Rev1 8,300.02 65.65 60.39 4,448.45 4,375.85 3,434.41 5,350.79 6,003,525.93 571,396.61 0.00 6,358.15 8,400.02 65.65 60.39 4,489.68 4,417.08 3,479.43 5,430.00 6,003,571.64 571,475.41 0.00 6,449.13 8,447.98 65.65 60.39 4,509.46 4,436.86 3,501.02 5,467.98 6,003,593.56 571,513.20 0.00 6,492.76 Total Depth : 8447.98' M D, 4509.46' TVD - 7 5/8" ,. 4,447.61 MPS-01AT1Rev1 3,433.50 5,349.17 6,003,525.00 571,395.00 - Circle (radius 100.00) 4,447.61 MPS-01AT1Rev1 (copy) 3,433.50 5,349.17 6,003,525.00 571,395.00 - Circle (radius 100.00) rci~-rOS~rtl Ca~in~ ~oints .. . , . ,.. , . .,. , r. .: , Mea~ut~d ~ , Verticat ; Casieg .. Hoie , : : DePth~ [~aPth . ~ E7F~ ~` Diairtster~., ~ ~~ . : ~,~) ' t~~ . ; _ ~"~ `.; ~"~ . . : . . 112.10 112.10 20 36 3,140.11 2, 374.92 10-3/4 12-1/4 8,447.90 4,509.42 7-5/8 8-3/4 3/6/2007 6:21:42PM Page 5 of 6 COMPASS 2003.11 Build 48 ~ Halliburton Company ~ Planning Report - Geographic ~ Halliburton Company ~ Planning Report - Geographic .Spe(rY_EDM .,. Lo~l:4`O~titdFr#a#~rFti~. : , . . We11 MPS-01 BP Amoco ~ , ~~_TV'I~~ t~~tcA~ ~~ ; ~'.~ 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) Milne Pant WID Rilfmr~t~e::' 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) M Pt S Pad ; Nq~Wt~t Ref~rMt:6` ;: : True MPS-01 SuiPVey' Gal~t~t[pn ~[et~tt~d °. Minimum Curvature Plan MPS-01A MPS-01A WP 04 : ~hr'+ci~ncfsad F~t~'snaEi~n tnters~~s~~f P~ir~i~ ; .. Measu~ett 1t~tk~r.ti~ ~~t~ tt~cti~tion .: /lzimuth D~p#M~ . +~-E ~~W <~~) :. :: t"'1 . : .,. . . {°3 ~~ : ; '. fft? .. Ift~ ; . , ; ~~ <, < 2,021.63 43.11 53.92 1,822.60 465.82 516.55 .......„ . BPRF 6,519.95 65.65 60.95 3,714.61 2,646.93 3,933.04 TU2C 7,087.56 65.65 60.95 3,948.61 2,898.01 4,385.14 Ugnu-MA 7,138.50 65.65 60.95 3,969.61 2,920.54 4,425.71 Ugnu-MB1 7,264.63 65.65 60.95 4,021.61 2,976.34 4,526.17 Ugnu-M62 7,565.42 65.65 60.95 4,145.61 3,109.39 4,765.74 Ugnu-MC 7,684.28 65.65 60.95 4,194.61 3,161.97 4,860.41 SBF2-NA 7,822.54 65.65 60.95 4,251.61 3,223.13 4,970.54 SBFi-NB 7,871.06 65.65 60.95 4,271.61 3,244.59 5,009.18 SBE4-NC 7,907.44 65.65 60.95 4,286.61 3,260.68 5,038.16 SBE2-NE 7,999.62 65.65 60.95 4,324.61 3,301.45 5,111.57 SBE1-NF 8,062.69 65.65 60.95 4,350.61 3,329.35 5,161.81 TSBD-Top OA 8,171.84 65.65 60.95 4,395.61 3,377.63 5,248.75 TSBC-Base OA 8,234.91 65.65 60.95 4,421.61 3,405.53 5,298.98 TSBB-Top OB 8,290.70 65.65 60.63 4,444.61 3,430.23 5,343.40 SBAS-Base OB 3/6/2007 6:21:42PM Page 6 of 6 COMPASS 2003.11 Build 48 N'F.LL DLTAILS ANTI-('()LL111()N tiCTTIN(~ti (<)MPANY DI:'fA1LS Aamc ~~r.S ~F:-N' ~orthmg I~auing LaziNdc LnnFiludc Slm Intcrq~lation\1lhcxl'.17D In~crval' ~5.011 HPAmncn MPC-111 fi9.(17 -_'fi7.4'1 M1INHNIi4.fi< <fifif17fi.91 ~(1~_^J_iM.(NIX~ IJ'Y'-_'i'J1.(IIIN' ~.,1 D~plhRun~i~ri~m: l~Sll(111 T~~ R4474fi lnlcululi~ Mth~d: Mn~m~~m(unn~urc ~A.~m~ma.~~E.- ioai ~~ a~r~T~~~~ ri,~ wrs-ni:~~crna r.,.~~s~.um iscHSn Scan McthM: 'fmr Cvlindcr ~orth ermrsurio«: eu~ru=ai ~ ra.~ns lY;immg Me1hM1: Rulcs dxxd From Colour To MD 3250 10000 10000 10500 1050O I1000 I1000 11500 II500 12000 12000 1290p ncnn ~xnnn 0 ~e~\, PS-~1 PL2~ - M ~ / - 30 ~`~ ~'yns~~ ,\\ 30 ~ , ~~a~~ ~ ~ ~ 20 ~'S ~Q ~ ~ ., ~ ~~q ~ ~~ ~~ ~ ' ~ 10 \ ~ ~ ~ .. ~ ~ ~ ~ ~ I 10 0 270 ~ 90 ~~ 20 1\ / 30 ; ao -- / - / ~ec~ no / ~ MPS-0I~MPS-Ol~.~nl ~ MPS-OI~MPS-OILI~.~ , ~ MPS-IIIIAIPS-f11L'_~,~ ~ MPC-l11IA1YFnIL'PN ~ M~SJII Ih1I'S-OIPHII. MPS-111 iPlan ~iP~-111! ~ ~ MPS-11' IMPti-U_'1. Mo~ ..-- MPS-Ili IAf1'5.1111. Mn~ - MI`ti-IIiIM11P1~111L17.~ .- MPS-n.fiMP~-nal.ntn~ IS(~ ~ MPS-II.IIAfi`\-fI4Ll1.~ MPS-(1.1 I M1f Iti-1~4 L I 1'X ~ MPt-tIJ1~f1'~-flJLll'N .. -- MP~-11~ ~~iP~-ncG Mn~ ~ MI'S-Ilt IMI'ti-IISf.I l. ~ ~ MPti~I~IMP~~I1~PNl1. ~Krrv ~ PlanAfl',C.UTA sm~ u va~wnnw ~c~a.i.rmm ~ernus f~.~Ml~4m I]eMM1Tn Su.~ey.Pleo Tml ~~s\11'C-~IA 13-~0a0 W]w. Mumed:M'.S.nIANPOaI'~N MN~'MIFX-M.v I'nr~iiiN.~M:nl~ MPC.OIPPI I"ic~~n\I~~~ LHI.fNI wi n.~ . ~x3 ~ ia.~ v±ann ~n fTig~n ITipin aninp Ar41e ~N:.S ~F:-W Yeoin I\'Il n From Colour To M 3250 10000 10000 I0500 - 1~000 - II500 - 12000 12500 - 13000 ling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [30fUin] S[(TION DETAILS Sec MD h~c Azi TVD 'A/-$ -f:/-W DLeg TFece VSec Targe~ I LGqpp fi634 4R.SR ?419.74 II'_1.25 Ii51_15 p.pp p.(q 1747.14 3?70./N1 66 fiX 49 t7 ?4?7.71 1135 ]9 ~3R5-19 4IX1 fi5 (Xl 17fiI.R9 7 i5?0.(XI 70.0'_ iM1.6(1 ?520.Oi I'_74.9'_ ISSp.(~q 3.00 RS.IIfI 1993.36 6 60?O.IXI 71)0? Sfififl 2fi9f1_91 ISti.fiO 194'9? O.fNI 0.0f1 '46i.21 S 4?IR.O? fi5.fi5 fi(1.95 ?]fi5fi? Ifi?P70 ?f199.61 l.fNl IiN.05 ?Mfi.44 6 P?AO.R4 M15.M15 fi(1.95 d440.54 34'_S.R~ 53i5.57 O.fNI 0.(Ifl M1i40.72 7 P'_97.9fi 65.fi5 M1Di9 444]fi(1 3ali.]9 S149.16 3.(10 -90.51 635(.?R MPS-OIA'flRcvl N RS47.9fi M1S.fiS (~)i9 4Gp9.di 1501DI S4fi797 O.IXI 0.0(1 fi49?.75 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ I OOft/in] ~ Halliburton Company ~ Anticollision Report Company: ' BP Amocfl Date: 3/6/20Q7 Time: 18:12:06 Page: f Field: Milne Point Reference Site: M Pt S Pad Co-ordiaate(NE} Reference: Weil: MPS-01, Tn~e North Reference Well: ° MPS-01 , Yertical (TVD) Reference: 3$.3 + 34.3 72.6 Reference Wellpath: Plan MPS-01A Dbs OraGe' GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error ModeL- ISCWSA Ellipse Depth Range: 3250.00 to 8447.96 ft Scan Method: Trav Cylinder North Maximum Radius: 1041.37 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 6/20/2006 Validated: No Version: 2 Planned From To Survey Toolcode Tool Name ft ft 120.10 245.10 MPS-01 Gyro (120.10-245.10) (0 KPR-SS SDC Keeper sin gle shots 367.26 3250.00 MPS-01 P61 IIFR (367.26-11267.3 MWD+IFR +MS MWD +!FR + Multi Station 3250.00 8447.96 Planned: MPS-01A WP 04 V38 MWD+IFR +MS MWD + IFR + M ulti Station Casing Points MD TVD Diameter ; Hole Size Name ft ft in in 8445.56 4508.46 7.625 8.750 7 5/8" Summary <- - Offset Wellpath `' ~ Reference Offset Ctr-Ctr No-Go Allowable ' Site WeR Wellpath MD NID Distance Area Deviation Warniug ft ft ft ft ft M Pt S Pad MPS-01 MPS-01 V4 3275.10 3275.00 0.27 87.07 -86.80 FAIL: Major Risk M Pt S Pad MPS-01 MPS-01 L1 V3 3275.10 3275.00 0.27 86.87 -86.60 FAIL: Major Risk M Pt S Pad MPS-01 MPS-01 L2 V5 3275.70 3275.00 0.28 87.01 -86.73 FAIL: Major Risk M Pt S Pad MPS-01 MPS-01 L2P61 V5 3275.70 3275.00 0.28 87.05 -86.77 FAIL: Major Risk M Pt S Pad MPS-01 MPS-01 PB1 V7 3275.10 3275.00 0.27 87.07 -86.80 FAIL: Major Risk M Pt S Pad MPS-01 Plan MPS-01A L1 V1 Pla 8050.00 8050.00 0.00 155.57 -155.57 FAIL: Major Risk M Pt S Pad MPS-02 MPS-02 V7 3271.74 3425.00 470.37 76.85 393.52 Pass: Major Risk M Pt S Pad MPS-03 MPS-03 V21 3948.35 4050.00 145.94 87.39 58.55 Pass: Major Risk M Pt S Pad MPS-03 MPS-0311 V10 3948.35 4050.00 145.94 87.29 58.65 Pass: Major Risk M Pt S Pad MPS-04 MPS-04 V7 3261.57 3525.00 435.16 61.97 373.19 Pass: Major Risk M Pt S Pad MPS-04 MPS-04L1 V4 3261.57 3525.00 435.16 61.84 373.32 Pass: Major Risk M Pt S Pad MPS-04 MPS-04L1PB1 V13 3261.75 3525.00 434.97 61.82 373.15 Pass: Major Risk M Pt S Pad MPS-04 MPS-04L1 PB2 V9 3261.75 3525.00 434.97 61.82 373.15 Pass: Major Risk M Pt S Pad MPS-05 MPS-05 V2 3251.74 3425.00 598.20 65.82 532.38 Pass: Major Risk M Pt S Pad MPS-05 MPS-05L1 V2 3251.74 3425.00 598.20 65.71 532.48 Pass: Major Risk M Pt S Pad MPS-05 MPS-OSPB1 V3 3251.74 3425.00 598.20 65.82 532.38 Pass: Major Risk M Pt S Pad MPS-06 MPS-06 V11 Out of range M Pt S Pad MPS-07 MPS-07 V9 3256.58 3525.00 694.94 85.01 609.93 Pass: Major Risk M Pt S Pad MPS-08 MPS-08 V10 Out of range M Pt S Pad MPS-08 MPS-08PB1 V9 Out of range M Pt S Pad MPS-09 MPS-09 V6 Out of range M Pt S Pad MPS-10 MPS-10 V14 Out of range M Pt S Pad MPS-10 MPS-10A V4 Out of range M Pt S Pad MPS-11 MPS-11 V5 Out of range M Pt S Pad MPS-12 MPS-12 V5 Out of range M Pt S Pad MPS-12 MPS-12L1 V2 Out of range M Pt S Pad MPS-12 MPS-12P61 V2 Out of range M Pt S Pad MPS-13 MPS-13 V7 Out of range M Pt S Pad MPS-14 MPS-14 V6 Out of range M Pt S Pad MPS-15 MPS-15 V7 Out of range M Pt S Pad MPS-15 Plan MPS-15A VO Plan: Out of range M Pt S Pad MPS-16 MPS-16 V8 Out of range M Pt S Pad MPS-90 MPS-90 V6 Out of range M Pt S Pad Pian MPS - 00 Plan MPS-00 V2 Plan: M Out of range Site: M Pt S Pad Well: MPS-01 Rule Assigned: Major Risk Wellpath: MPS-01 V4 Inter-Site Error: 0.00 ft Reference' 4ffset Semi-Major Aais Ctr-Ctr No-Go Allowsble ; NID TVD MD TVD Ref Offset TFO+AZI TFO-HS CasinglHSDiatance Area Dev~ation Warning "` ' Alaska Department of Natural Resources Land Administration System Page 1 of 4 ~ ~ y '' .~~ ~ ,~` : ~ , , i.,._~~ ~~~~rt~~I~f~~~i~ F?1a~s: Re~~rder's Search State Cabins ~~~ ` ~ ' s~-~ ~ _ . m ~ ,.,,, ,,,,,.,~~ ,, ;: ~~5~f~1 ~~ l~! C ~~~~ File Type: AD~ File Number: 38oi1o - Printable Case Fiie Summary See Township, Range, Section and Acreage? ~ ~` Yes t" No ~~i~~~r~i~ T. I2N., R. IIE., UMIAT MERIDIAN, ALASKA SECTION 5, 'UNSURVEYED, A~L, 640 ACRES;• ~'EC7'ION 6, UNSURVEYED, ALL, 577 ACRES; SECTION 7, UNS~IRIIEYED, ALL, 580 ACRES;• SEC7'ION 8; UNS~IRVEYED, ALL, 640 ACRES: http://www.dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=3 80110... 3/ 12/2007 ~` Alaska Department of Natural Resources Land Administration System Page 2 of 4 ~ ~ THIS TRACT CCINTAINS 2, 437 ACRES MORE' OR LESS'. 11-1-96 * * * UNITIZED LEGAL IIESCRIPTION * * * ' MILNE POINT UNIT ' TRACT 24 T. 12 N., R. 11 E.; U. M. SEC. S: ALL,~ SEC. 6: ALL; SEC, 7: ALL; SEC. 8: ALL'; CONT~IINING 2, 437. 00 ACRES, MORE !O~ LESS. ` I1-1-96 * * * KUPAR UK ~'A LEGAL DESCRIPTIQN *'* * ` T. 12 N., R. 1';1 E., U.h~ SEC. 6: W112NW1/4, WI/2SW1/4~: SEC. 7: NWI/4Ni~1/4; CONTAINING 122. 00 ACRES, MORE OR LE5',S. 07-DI -1996 *** SCHRADER BL UFF PA INITAL LEGAL DES~'RIPTION *** T. 12 N., R. 11 E., U.M. ,SE~'. 6: ALL,- SEC. 7.• ALL;. ' CONTAINING 1,157. 00 ACRES, MORE OR LESS. 11-1-2001 *** UNIT A UTOMATICALLY CONTRACT' TO FA LEGAL *** http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumbet=3 80110... 3/12/2007 ` ~ Alaska Department of Natural Resources Land Administration System Page 3 of 4 ~ • I, ' MILNE POINT UNIT TRACT 24' T. 12 N., R. 11 E., U.M. ' SEC. 6: ALL;' SEC. 7: ALL,~ C~NTAINING I,157.00 ACRES, MORE OR LESS. 04-01 2003`* ****MILNE POINT UNIT AND SCHRADER BL UFF PA EXPANDED ******* LEASE GOMMITTED IN ITS ENTIRETY TO THE UNIT AND PA UNIT AND FA L~GAL DES~'RIPTION MILNE POINT UNIT ` ' SCHRADER 13L UFF PARTICIPATING AREA TRACT 24 T. 12 N., R 11 E., UMIAT 1VtERIL7IAN SEC~'If)N S: UNSURVEYED, ALL, 640. 00 ACR~S,~ SECTION 6: UNSURVEYED, ALL, 577. DD ACRES; SECTION 7: '~INSZI'RVEYED, ALL, 580_Q~ ACRES; SECTION 8: 'UNSURVE~ED, ALL, 64Q. 00 ACRES; THIS TRACT C~NTAINS' 2, 437. 00 ACRES, MORE C~R ~ES,S. ~, http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumbe~3 80110... 3/12/2007 . ~ Sondra D, Stewman - ss-si,25z 1-60 BP Exploration AK INC. ^Mastercard Check" PO Box 196612 MB 7-5 r~} j'~ Anchorage, ~4K 99519-6612 oa,rE ~ ~v - .v PAY TO THE~~ ~~ ~~ I$~~~' C~ DRDER OF - - ~ i ~~-r1~i' ~t , ~n ~Ci c1; ~~YT~~ DOLLARS ~ First Na ion ank A ska Anchorage, AK 99501 . MEM~~~ _ ~I .~°C ~ ~~ ~: L_2 5 200060~:99 ~46 :2 2 7.L 564~~' Q 160 . ~ , T`RAYSMI"T'~'AL LE~"~'ER CH~CKLIST wELL r~NtE <S 01~ PTn# ~~~~~ / Development Service Exploratory Sta-atigraphic ~'est Yon-Conventional Wet! C'ircle Appropriate Letter / Paragraphs to be Included in Transmittal Letter ' CHECK i ADD-Oi~fS ' T'EXT' FOR APPROVAL LETTER ;' VVHAT ~ (OPTIONS) i ! ' APPLIES I ~ I ! ; ~ ' MliLTI LATERAL ~ The permit is for a new we(lbore segment of existing i i ~ welt ~(IF last two digits in I Permit ~Io. , AP[ No. ~0- - - ~' ~ i API number ; between 60-69) I are ; Production should continue to be reported as a function of the ~ i ~ origiRal API number stated above. ' ~ ' ~ PILOT HOLE i ~[n accordance with 20 A.4C 2~.00~(~, all records, data and logs ; ; ! acquired for the pilot hole must be c(early differentiated in both ~ i ; wel( name ( PF~ and API number ~ '(50- - -_) from records, data and lo~s ~ ~ ~ acquired for well i ~ SPACING T'he permit is approved subject to full compliance with 20 AAC ~ ' EXCEPTION ~ 2~.0». Approval to perforate and produce / iniect is contingent i ; I upon issuance of a conservation order approving a spacing j i ~ exception. assumes the ~ ~ ~ ~ i liabitity of any protest to the spacing exception that may occur. ~ E ~ ; DRY DITCH ~ All dry ditch sample sets submitted to the Commission must 6e in ; i SAMPLE I no areater than 30' sample intervals from be(ow- the permafrost or i ! I from where samples are ficst caught and 10' sample intervals j ! ~ [hrough target zones. ~ , ~ Please note the fo((owing specia! condition oP this permit: ! ~ Non-Conventional i production or production testing of coal bed methane is not allowed ~ j Well ~ for (name of we(1) until after (Companv lV`ame) has desio ed and ! ~ '. imp(emented a water we(I testing program to provide baseline data I j ; on water quality and quantity. ~Com~a.nv Name) must contact the i ~ Commission to obtain advance approval of such water well testing ! ~ program. ~ Rev:(;2~i06 C:` jody~[ransmittal_checklist • , ~ ~ ~~ m N , m~ ~N a N N ~ ' , . ~ . , , ~ . , ~ ~. , ~ . ., . . , . . , . . ~ ~ , ~ , , , . ~ .. U. ~ . ' O 4 ~ 7 . . . . . , 1 . . ~ . ~ , . , . , , . . . , . . . . ~ . . ~ , , . . . , , ~ . ~ ~, , ~ . X~ , .. _ ~> C Q . ~ ~ ~ ~ , ~ . . , , , ~ , ~ ~, , ~ ~ ~ , ~ ~ ~ ~ ~ . ~,, . ' . . . . . . , . , , . . , N~ . . O? . , , , , , ~ . , . ~ ~. , ~ ~. .. . N ~. . ~~ > . , ~ . , , . ~ ~ . , ~ . , ~ . ~ ~ . ~ , . >~ . , ~ , . ~ ~ ~ p ~ . ~ , ~ . ~ , ~ ~ ~ ~ . ' ~ . ~ ~ ~ ~ , ~ ~ , . ~ ~ , . . N= ~. ~ ~ ~ ~ I ~ ~ . , ~ ~ ~~ ~ ~ j f ~ , ~~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ,~I ~ . ~ ~ ~ ~ ~ ~ ~~ ~ ~ . ~ ~ , ~ ~, ~ ~ Q~ ~ ~ ~ ~ . ~ ~• , r` ~ . ~ -° ~ ~ , ~ ~ ~ ~ . ~ . ~ ~ . ~ ~~ 3, . ~~ , ~ a ~ ~ , ~ ~ . I , ~ ~ ~ ~ ~ O , v, a i ~ ~ i , ~a ~ ~ ~ W ~ ~~ ' o ~ , ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ o~ a m, o ~ ~ N ~ ~ ~ ~ o > L ~ ~ T , ~ ~~ a~ ~ ~~ ~ ~~ ~ , ; , ~ ~ , , ~ I ~ ~ ~. ~ ~ ~ ~ ~~ ~ i ~, ~ ~ ~ ~ ~ ~ ~~ ~ ~~ ~ ~ w ~ ~ O ~ ~ ' ' ~-~~ ~~ ~ m, r ~ ~ , ~ ~ , ~ ~ . I , ~ , ~ ~ ~ ~~ ~ ~ ~~ ~ Q ~ ~ ~ ~ ~~ ~ ~~ ~ ~ ~ ~~ C N~ ~~ ~ ~ ~ ~ ~ , , ~ ~ ~ , ~~ , ~ ~, O ~ ~ fl' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ T f6 V, ~ ~ ~ ~ ~~ ~ ~ ~ ~~ ~~ N ~ p ~ ~ , ~ N, G~ , , , , . , , . i , , . , , , ~ , N, , , O ~ , , , i, O , ~ , ~ y ) O ~ ~ ~ ~ ~ ~~ ~ ~~ ~~~ ~~, ~ ~ ~ ~ ~ ~ ~ ~ , . ~ ~ ~ ~ ~ ~ ~ :, ~ ~, ~ ~ , , , ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~~~ ~ , ~ ~ ~ ~ ~ ~ C, ~ ~ , ~ ~ N~ p) ~ n. ~~ ~. ~. o ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~,~ ~ ~,, ~~~ ~ ~ a~~ ~ ~~, ~. ~ ° ~ I ~ ~ 0~ ~~ ~ Q ~ ~ ~ ~ , ~ ~ ~ m~ 3 ~ -a, ~ a~ ~ ~-a, ~ ~ ~ ~~~ ~ a~"~ i ' i U y ~, ~ . - , o ~ , ~ ~ ~ ~ i ao ~ ~I T ~ ~ ~ x o '~ Q, ~ -a ~ ~ ~ -o ~ , a~ o f ' ~ ° ~ ~ aai c a~ a~ m o - , , a c~ c. ~v m ~ °' o. ~ ~ ~ ~~ ~ . , c ~ ~ , ~ d. ~ . ~ t ' O ~': ~~ ~~ ~~ N Q ~ ~ , ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ , ~ , C. ~ ~ ~ y~ , ~~ N ~ ~~ ~ ~ N~ ~ . ~ . ~~ ~ E , 1 ~ ~~ '~~ ~ . m~ I~ ~ M~ ~ m ~~ ~ ~ ~, ~ ~ ~ ~ ~ , V~ ' ' _. , ~ ~ . ~ ~ ~ . cC, Q~ , ~ N~ ~ ~ ~ O. ~ . y~ ' ; ~ i , , Z~ ~~ . , ~ Q 0: Q~ ~ p, V N~~ N~ ~ ~ ~ ~ ~ ~ ~ , M O ~ ^ Q w ~ ~ ~' _ ~ ~ Q p ~ ~ ~~ ~ ~ ~~~ Q SrC: ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~. ~ n v~ N ~ . ~ ~ , ~ ~ ~~ ~~ ~ , ~~ .~~ . ~ ~ ~ . ~ , ~ ~ ~ N Q~ ~ ~ ~~~ , , N~ ~~ ' ~~ O~ ~ ~ N~ ~ . ~ , , ~ ~ ~ ~ ~ , , , , ~ ~ ~ . 0. ~~ . , . ~ ~ N~ ~ , ~~ ~ N~ ~ ~~ ~ N~ . . ~s . ~ m~ ~ fn~ ~ _~ ~ ~ C~ ~ m ~ 3 ~ T ~ ~~ ~ N a~ C ~~ ~, ~ ~ ~ ~ . . ~ . ~ I' ~ ~~~ ~ . ~ ~ Z~ ~ ~, N N, V~ ~~ o , p~ . ~ ~~~ ~ ~ N~ ~~ <6~ , I"' I ~ N~ - ~~~ ~ O~ O. ~ ~ ~ ~ ~. ~ , ~ I a _ "~~ ~ , ~ ~ Z, ~~ Q ~ M~ ~ ~ ~~ _~ Z ~~ ~ Z I ~ ~ ~~~ ~_~ ~ `, ~ O~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ , ~ ~' ~ ~~ d'~ ~~ ~- '. a ~~ ~~ ~ ~ ~ ~ ~ ~ a ~ ~ ~ ~ .. ~ ~'v~. ~ ~~~ ~ Q , ~ N~ , ~ t~ .~ ~ °~ ~' N ~ ~`~ ! V 3 o a' c°~' ~r ~ ~ ~- ~' a~: 16 mn ~ ~ °' c o a w ,_ ~ m~ ~ ~, ~~ ~ . ~ ~ , ~ ~ ~ ~ i ~~ `., , Q ~ . d~ ~ ,~~ T~~ ~~~ , ~ , ~ i c V~ N~ ~V, . l O Z rn 3, ~ ~ .~ -cy ~: ~n ~-a o, a~ i a~ ~~ ' J~ pp . ~ ~ ' ~ N~ ~. Ul~ C, O~ ai ca E ~ ~ , . ~ ~ , ~. i • ~~ `o ~. ~-~ m _ ~ ~3 ~, , L~ ~ pl, (O~ ,~ ~ ~ ~ ~ ~ ~~ O~ ~ ~ ~ a~ g ~i m ~ ~ ~° , , ~ ~~~ ~ ~,~ ~ ~ , ~ ~ ~ I I ~~ ~, - a~ ~n~ ~,~ ~ ~ 3: -a ~ ~~,~ ~. ~~ > ~~ ~ ~~ ~ m: ~. a~ ~ ~ a a~ , ~ I . , _ a~ ~ ~ I ~ ~ ~ >j~ ~ C~ ~ , U~ ~. ~ ~ ~ ~ ~ .. i ~ ~ N~ 6, ~~ , ~ ~. , ~~ ~~ ~ , V~ . ~ _~ N~ ~~ a~ ~ Z ~ ~ ~ ° ~ o , I ~' °i ~, o ~ r~ .~ y ~ c~i, ~ I 3 °- ~ ~ ~.- -a ~ ~ i.,~ ~ Q~ v 3, _, ~ ~ ~ ~ , , ~ ~ ~~ ~~ v s ~, m a~ ~ ~ ,N co o ~, u~~ . E x~ d ~ p.,. ~ (R ~ u fl, ~ m~ ao~ ~ ~ E m: j Z~ > ~ ~~ .~'~ ~ ~~ ~~~ ~, (6~ N~ (~. C~ ~~ : ~ , ~ ~ ~ ~ , ~ ~ ~ ~ , ~ ~ ~ ~ ~ I 0~ ~~ U~ Q~ ~, (A~ ~ , ~ ~ , , ~ ~~ 0~ ~ O~ O~ ~~ ~~ [~~ ~~ ~ Q~ ~ ~~~ ~ ~ N~ : ~ ~ i ~~ `p~ ~~ . p~ Z~ O~ ~ W Q M y l . ii a i~ , . , ~ ~ ~ ~ '~ ~ ~ , ~ ~ ~ ~ ~ , ~ . , , ~ ~ ~ ~ , ~. ~ , ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~. , ~ , ~ , ~ , , ' ' ' ~ ~ ~ , , ~ ~ . , ~ ~ ~ ~° ' i ; ; " I b M~ t/}~ a~~ a~~ , t~~ !/j~ a~, a~~ t~~ t~~ fA~ a~~ a~~ a~, t~~ M, a~~ a~~ , fA~ Vl~ a~~ a~~ V/~ a~, t~ a~ Q: ~ d, ~ Q~ Q~ ~ ~~ Q, Q~ Q~ ~ o, t~~ a~~ tly~ a~~ f~~ a~~ M~ a~~ VA qD a~, Q~ a~~ N~ N~ y~ a~~ a~~ a~, N~ ~ a~~ ~~ ~ Q~ rq~ t~~ a~~ a~~ Q, Q, , Q, ` ` Q T >-~ >'~ >', >', >-, ~, >- ~, >-, ~, >-, ~, >- Z Z, Z, Z i Z Z, Z, Z, ~, ~, Y~, ~, ~, Z, ~, ~ ~, ~, >-, Z, Z >-, ~, Z, Z, Z N o ~ \ N ~ ~ ~ ~ , ~ ~ , ~ ~ ~ ~ LL~ , , T ~ ~ . . ~ , ~ ~ , , ~ ~ ~ : ~ ~ . , ~ ~ . ~ 0 ~ (~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ , ~ ~ °' ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ~ ~ ~ M ` ~ . ~ ~ ~ ~ ~ ~ : ~ , . ~ p , _ ~ ~ ~ , ~ . , ~ , ~ ~ ~ ~ ~ , . ~ i ~ , ~ . J :c , , E 3 , - , , o ~ , ~ , ~ Z, a~ , , . a~, ~ , , ~ , N o ~ , p o v , , - , v , T ~ ~ N ~ ~ ~ ~ ~ ~ ~ , , ~ ~. Q ~ x C, N L~ , ~ , ~ . ~ ~ ~ , , ~ ~ ~ ~ ~ ~ ~ ~ p~ ~ ~ , ~ E ~ I ~ ~ , ~ ~ ~ ~. ~ ~ , ~ . ~, O~ C~ . ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~~ ~ ~ , ' j; ~ ~ O ~ , ~ ~ ~ , ~ ~ ~ a~ a~; i ~; i ~ . ~ ; ~ ~ y, ~ , 3 ~ . , ~ 0 U ~ ~ ~ ~ . ~ , . ~ ~ , , Q~ N, M~ ' ~ ~ ~ ~ , , . ~ ~ ~ . ~ ~ ~ ~ , ~ ~ ~ ~~ ~ ~ ~ V~ . ~ , , ~ LL i J I O V Z = ~ ~ ~ II ~~ , ~ , ~ N~ ~ ~ ~ , ~~ ~ ~ . , , . ~: m I . ~ . . ~ , , ~ ~ , ~ ~ ~ . ~ , ~ ~ . , ~ ~ .U N , ~ ~ N Q I ~ ~ ~ . m . . ~ . . , ~ O ~ , ~. E ~ N . ~ . Q ^ ~~ W . ~ ~ . , ~ ~ . ~ ~ ~ ~ ~ ~ . ~ . ~ ~ . ~ ~ ~. ] N~ G ~ O ~~ N~ , N~ ~ . ~ V~ , ~ ~ , ~ ~ Q , ~, ~ c6. ~ O~ ~ V ~ ~ , , , . . f~~ ~, Jh . ~ , . ~ ~ ~ ' u X \ t ~ ~ , ~ ~ ~~ ~ ~ ~ . O~ ` T ~ ~ ~ ~ C ~ ~ ~~ ? ~ jp~ o . Q (II~ ~ ~ . a` . ,C~ . ~ _O' y ; ~ tn' ~ f6 ~ ,\ `°J . ' , ~ . ~ ~ , , ~, ~ o. ~ ~ - -o ~ o Q I ~ m ~ ~ c, a~ ar a, rn v •,~ eo, a~. w ca ~ a~ -C ° p ~ _ ~ , " ~', 'C , p ° N w ~ 7. . . ~s w i~ , ~~ ~. ~ . fl. ~. ~~~ ~ . ~ N ~ ~ U~ rn ~ . ~ ~ 3 N ~ 3 ~ ~ ~ C ~ ) • ~ 3 . 0 C ~ 'O~ p~ ~ ~ ~~ O 7~ ~ p, N ~ ~ ~ N ~ C y~ o - (6 ~ Q ~ C ~ o >~ ~ . , ~, ~ ~ -o ~ n ~ ~ ~ , , ~, ~ .c ` > o m ~ L 6, o 4 ~ ~ ~ .o . o: Q ~, '~ o. , -6 ~, 0 l - ~ ~ ~ n ' Y J U Z Z ~. . , ~ a > ,_~ ~~ ~ ~ , a~ ` ~~ y~ >, ~p .. . 7~. 3, N~ ~~ . ~~ ~ ~~ ~ t~ ~ ~ ~ C~ ,~~ ~~ ~ ~ ~ ~~ ~~ ~~ ~ i Q~ I ~ M N m ; -O~ p~ C, '6~ ~ O~ N~ C~ 'O f6. N~ fl. ,~~ O~ ~ C~ ~~~ ~~ ~ p~ O~ ~~~ ~ ~ a~ N L~ ~ I C~ ~ ~~ ~~ p , O ~ a Q _ E E ~ a ~n ~ c ~ E ~n ~ ~u >, ~ ~ o cN ~ e' c' ~ ~n > H' v ~ 4 a~ o otf' °3' ~ N ~ ; y o o ~' °n N.c d rn ~ c w Y (4 ~ ° ° ~. ~` „ , ~ , ~ ° -o o -° m ~ ~ w, ~ ~ ~' Q! 3 o ° rn ~ ~j `. 'o. `6 n Q ~ ~ o aS ~ °- ~ ~3 ~ ~ ~ °~ ~' `~' y m -'` °- a~ 'N Z ~ ~ ~ ~ N~ p ~ C, ~~ C~ O 7 7 p ~~ ' ~~ ~~ O~ i ~ C~ ,C ~ ~ pi C ~~ O ~ ~ ~~ f6~ ~~ ~ (6~ O ~~ ~~ Q~ .(6~ (0~ ~~ S5. N ~ ~ 'O O~ OD O T N~ . N ,~q - g g~ ~ O ~ 4 V, V ~ c c n '_, ~ ia ~ . ~ o, t o r ~ ~ ~ ~ ~ (0 ~, ~ ~ m I _ -o ~ (p ~ c a , , Z ~ ~ Y ~, m, ._ a~. ~ ~ 4 ~ a Q. Q ~ ' L ~ 3 w. ' °`~ a~, 3' .S ~ c E m ~ a ~ ;a ~u n fl °? ~ . - ~6 -a E a~ ~ ~ ~ ~ r~ ~. m ~ N ~ ° ° 3 o ~ ~T z ~, , ~ ~~ C~ v~, ~~ '(6 , N, -O~ 3, ~, ~ 3~ o a~ ~~~ ~~ , ..~ o~ :~ `~~ ~ U c~~ .°-~~~ ~ 3 ~ f°~ ~~ ~, o ~ , , a a~ u~i ' ~ a~ ~~. ' ~~ j, ~~ ~.- o, ; 3, ~' `°~ a~ , t~ o o w (~ . p °~ O- ° m ai a' ~' m o' °~' a ~, ~' ~ o ca '~ o ~ o~ o fl O ~ a o, V ° O N~, Q O_ a~ ~ o: rn c,' a, a ui ~, ~ a t- ~ ~ n ~~, a~~ m ~~ v~ o~~ ~ Q ~~ ~~ o ~ a o ai ai Y. ~~ ~ ~~ m °~ rn o~ ~ ~ cn ' .o. , ~, ~~ o ~n o~ ,tf ~ s o: U ~~ ~~ ~ ~ ~ a~ O O ~~ o, m N fl u~ N n f6 ;~ ~ ~ .a~ C Ul Q a1 f6. (6 - c9 ~ ~ ~ ~ ~ O a1 . c v T 3, c~ 2 ~, ~ ~n o y c N O t 4 "~ O ~a, ~; ~ m c~ ~ ~ fl. a~ 3~ f0~ `~ c . . . ~°, ~ ~ N ~ , 3~ ~ . ' rn I ~ ~ '~ c ~ ~ or ~ a> ~~ o ~~ . ~. ~~ '~ ° ~ °' a> m o'. ~~ ~ ~ w ~ ° a, ~ ~ . ~~, a~i~, j, '~' ~, li d <°' ~, 'a a -a c~ m ~ ~ ~ -o w a i _ N ,. aa -o a~ -Q >, o ? ~n ~ s ~ 3 a rn o N~~ ~ .Q c ca ~ c ~ X ~~ ~, 3, ~ a~ p ~ ~ c m c m ~E ~ 3 c> ~~' ~ o ~ m m ~ ~ a' _ = 3 a a~ ~°' o c m ~ i c a~ vi m cu ~~ W , ~ co o m cu ~, o o `o , `o ~ ~ m, `~ o c , iy a> o o: ~ , ~u -o ~ ~u ~"' °- ~~ ui = '3 ~ ~ i , ~ Q c? ~~ ~ ~ ~ ' m ' ~ ~ E ~n ar ~ ~ - - ~ ~~ - - '~ -- m~ ~, ~ ~ . .. . a> Q o~ _ - ~ o i ° ~ ~ c> ~ > = > - 3, ~ ~ ~ ~ ~ a ~ ~ ~ > ~ W L~J Y~ ~ ~ ~ • ,~ ~~ ~ ~ .~ .o, a,i ~ ~ a ~ ~ g a~ ' a~ a~ ~ a i a~ ~ a~ ~ ~ c , ~ 3 ' c °' , ~ 1 ~~ 1 ~' i-, ~ N, ~ f6 _ _ ~ j, ~ - o.. a. o ~' ° , a~ ~ ~p ' c m ~ ~ ~ a ~ c ~~' ~~ rn ~ ~. '~- O 4 a~ o a a~. a ~a U ~ - Q ~ o ~ z' o a; U v~ U , U , U m~ U ~a~ Q - ° a, Q 4- o O O, ~ m m U ~' ~'' ~' a~~ ~, a~~ a~~ n o cn cn o, U p m ` ~ j~ ' . ~ O N M <Y , ~ CO I~ ~~. ' 00 m O ~ N M V _ ~ , CO I~ 00 ~ ~ O N M , , V'~.., ' . ~A CO I~ 00 , ~ /y~ 1'~ ~~ ~ ~ N ._.._ M~t ~ CO I~ 0~ ~ ~ ~ ~ - ~ ~ - ~ -_ ~ ~ ~ _ ~ ~ ~ . __ N -_ N -___ N - N N N N N N - __ N M M __- _..___ _M_ M_ M ~_ M_ M M_ M ._ M O V r ~ r ~ .r~~~ O C ~ ~ ~ N ~ p U O . ~~O ~~ ~ ~ M lyl6 y p ~ M ~ II I ~ '~ ~ ~ C~ ~ \ . ~I i M T ~ ~ ~ p•~ N o •N ~ ~ ~= N ' d ~ ' I ~ O '."~ " ~k C ~ '' ~ i ~ L~ )( ~~. ~ _ ~ ~ G U ~ ~ Q a ~ ' ~ . a ~ ^'~ ~ . ' . ~ a n , • i Well History File APPE~IDI~C Information of detailed nature that is not particulariy germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simpl~fy finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efifort has been made to chronologically organize this category of information. ~ Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Jul 25 15:04:01 2007 Reel Header Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library Tape Header Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library. Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAU LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0005043233 J. BOBBITT E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD ~ _I Scientific Technical Services Scientific Technical Services MPS - O lA ~Y~ 500292314171 BP Exploration Sperry Drilling Services 25-JUL-07 MWD RUN 2 MW0005043233 J. BOBBITT G. BURLY 7 12N 11E 3375 4714 72.04 38.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.625 10.750 3140.0 2ND STRING 3RD STRING PRODUCTION STRING # a o~ -o3H ~ i 5~09 ~ . REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A CEMENT PLUG, THE TOP OF WHICH WAS AT THE 10.75" CASING SHOE (3140'MD/2375'TVD) IN THE MPS-O1 WELLBORE. 4. MWD RUNS 1,2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), ACOUSTIC CALIPER (ACAL), AND PRESSURE WHILE DRILLING (PWD). ROTATED ALD DATA OVER SLIDE INTERVALS BELOW ABOUT 6450'MD WERE ACQUIRED AFTER DRILLING THE INTERVALS. THESE MAD DATA WERE MERGED WITH THE MWD DATA. 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO THE SPERRY DRILLING SERVICES MWD GAMMA RAY LOG FROM MPS-O1. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 8 JUNE 2007, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST). THE SHIFTED GAMMA RAY LOG IS CONSIDERED PDC FOR MPS-OlA PB1. 6. MWD RUNS 1,2 REPRESENT WELL MPS-OlA PB1 WITH API#: 50-029-23141-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8390'MD/4490'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED HOLE SIZE). CTFA = SMOOTHED AVER.AGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: i • HOLE SIZES: ACAL-DERIVED (BIT SIZE 9.875") MUD WEIGHT: 8.8 - 9.5 PPG MUD SALINITY: 1000 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2808.0 8339.5 FCNT 3126.5 8294.5 PEF 3126.5 8308.0 NCNT 3126.5 8294.5 RPM 3126.5 8331.5 RHOB 3126.5 8308.0 NPHI 3126.5 8294.5 DRHO 3126.5 8308.0 RPX 3126.5 8331.5 RPD 3126.5 8331.5 RPS 3126.5 8331.5 FET 3137.0 8331.5 ROP 3141.5 8386.0 CALA 3152.0 8297.0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT L7NSHIFTED DEPTH --------- BASELINE DEPTH GR 2808.0 2800.5 2809.5 2802.0 2812.5 2804.5 2819.5 2815.0 2827.5 2819.5 2832.5 2829.5 2840.5 2834.5 2843.0 2838.0 2848.0 2841.0 2853.5 2847.0 2885.5 2882.5 2897.0 2896.0 2911.5 2907.5 2930.0 2926.5 2967.5 2965.0 3008.0 3007.0 3020.5 3019.0 3026.5 3024.5 3032.5 3031.5 3067.0 3064.0 3073.0 3070.5 • • 3077.5 3075.0 3089.0 3086.5 3092.0 3091.0 3109.5 3106.0 3117.5 3118.5 3128.0 3133.0 3141.0 3144.5 3146.0 3150.0 8386.0 8390.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 2800.5 7238.0 MWD 2 7238.0 8390.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD INCH 4 1 68 4 2 FCNT MWD CNTS 4 1 68 8 3 NCNT MWD CNTS 4 1 68 12 4 RHOB MWD G/CM 4 1 68 16 5 DRHO MWD G/CM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 RPM MWD OHMM 4 1 68 28 8 RPS MWD OHMM 4 1 68 32 9 RPX MWD OHMM 4 1 68 36 10 FET MWD HOUR 4 1 68 40 11 GR MWD API 4 1 68 44 12 PEF MWD BARN 4 1 68 48 13 ROP MWD FT/H 4 1 68 52 14 NPHI MWD PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2808 8386 5597 11157 2808 8386 CALA MWD INCH 8.8 12.84 10.3462 10268 3152 8297 FCNT MWD CNTS 401.82 3 524.9 779.669 10337 3126.5 8294.5 NCNT MWD CNTS 98857 1 91696 124483 10337 3126.5 8294.5 RHOB MWD G/CM 1.042 2.861 2.10974 10364 3126.5 8308 DRHO MWD G/CM -2.586 0.446 0.0269569 10364 3126.5 8308 RPD MWD OHMM 0.54 2000 15.1891 10411 3126.5 8331.5 RPM MWD OHMM 0.41 2000 13.8898 10411 3126.5 8331.5 RPS MWD OHMM 0.86 2000 13.9833 10411 3126.5 8331.5 RPX MWD OHMM 0.85 1 46.18 11.9548 10411 3126.5 8331.5 FET MWD HOUR 0.18 21.6 0.908663 10390 3137 8331.5 GR MWD API 6.1 1 20.68 64.9649 11064 2808 8339.5 PEF MWD BARN 0.38 12.31 2.21766 10364 3126.5 8308 ROP MWD FT/H 0.08 4 95.31 195.816 10490 3141.5 8386 NPHI MWD PU-S 8.05 98.59 35.7534 10337 3126.5 8294.5 ~ . First Reading For Entire File..........2808 Last Reading For Entire File...........8386 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BTT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 2800.5 RPS 3130.5 NPHI 3130.5 RPX 3130.5 RPM 3130.5 FCNT 3130.5 RPD 3130.5 NCNT 3130.5 PEF 3131.0 DRHO 3131.0 RHOB 3131.0 FET 3141.0 ROP 3145.0 CALA 3156.0 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 7192.0 7184.5 7147.0 7184.5 7184.5 7147.0 7184.5 7147.0 7161.0 7161.0 7161.0 7184.5 7238.0 7149.5 23-MAY-07 Insite 74.11 Memory 7238.0 3145.0 7238.0 63.2 70.5 # # # # # . • TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RESIS. 4 230203 CTN COMP THERMAL NEUTRON 174114 ALD Azimuthal Litho-Dens 224807 ACAL Acoustic Caliper $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3140.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.15 MLTD VISCOSITY (S) : 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 4.400 72.0 MUD AT MAX CIRCULATING TERMPERATURE: 3.350 96.8 MUD FILTRATE AT MT: 3.400 72.0 MUD CAKE AT MT: 4.600 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWDO10 INCH 4 1 68 4 2 FCNT MWDO10 CNTS 4 1 68 8 3 NCNT MWDO10 CNTS 4 1 68 12 4 RHOB MWD010 G/CM 4 1 68 16 5 DRHO MWDO10 G/CM 4 1 68 20 6 RPD MWDO10 OHMM 4 1 68 24 7 RPM MWDO10 OHMM 4 1 68 28 8 RPS MWDO10 OHMM 4 1 68 32 9 RPX MWDO10 OHMM 4 1 68 36 10 FET MWDO10 HOUR 4 1 68 40 11 GR MWDO10 API 4 1 68 44 12 PEF MWD010 BARN 4 1 68 48 13 ROP MWD010 FT/H 4 1 68 52 14 NPHI MWDO10 PU-S 4 1 68 56 15 • ! First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2800.5 7238 5019.25 8876 2800.5 7238 CALA MWDO10 INCH 8.8 12.84 10.3304 7988 3156 7149.5 FCNT MWDO10 CNTS 401.82 1493.67 750.779 8034 3130.5 7147 NCNT MWDO10 CNTS 98857 150932 123001 8034 3130.5 7147 RHOB MWDO10 G/CM 1.042 2.861 2.06934 8061 3131 7161 DRHO MWDO10 G/CM -2.586 0.297 0.026266 8061 3131 7161 RPD MWDO10 OHMM 0.54 2000 16.3152 8109 3130.5 7184.5 RPM MWDO10 OHMM 0.41 2000 14.9887 8109 3130.5 7184.5 RPS MWDO10 OHMM 0.86 2000 15.2242 8109 3130.5 7184.5 RPX MWDO10 OHMM 0.85 146.18 12.9006 8109 3130.5 7184.5 FET MWDO10 HOUR 0.18 7.62 0.649048 8088 3141 7184.5 GR MWDO10 API 6.1 120.68 62.124 8784 2800.5 7192 PEF MWDO10 BARN 0.38 12.31 2.18354 8061 3131 7161 ROP MWDO10 FT/H 0.08 429.63 215.224 8187 3145 7238 NPHI MWDO10 PU-S 15.96 98.59 36.7713 8034 3130.5 7147 First Reading For Entire File..........2800.5 Last Reading For Entire File...........7238 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 7147.5 8298.5 FCNT 7147.5 8298.5 NPHI 7147.5 8298.5 CALA 7150.0 8301.0 RHOB 7161.5 8312.0 DRHO 7161.5 8312.0 PEF 7161.5 8312.0 RPS 7185.0 8335.5 RPX 7185.0 8335.5 RPD 7185.0 8335.5 FET 7185.0 8335.5 RPM 7185.0 8335.5 GR 7192.5 8343.5 . ROP 7238.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # ~ 8390.0 25-MAY-07 Insite 74.11 Memory 8390.0 7238.0 8390.0 62.3 67.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CTN COMP THERMAL NEUTRON ALD Azimuthal Litho-Dens ACAL Acoustic Caliper $ # # # # # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER 10718517 230203 174114 224807 9.875 3140.0 Fresh Water Gel 9.50 .0 8.0 600 6.0 4.600 72.0 3.270 104.0 6.000 72.0 5.000 72.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ~ • CALA MWD020 INCH 4 1 68 4 2 FCNT MWD020 CNTS 4 1 68 8 3 NCNT MWD020 CNTS 4 1 68 12 4 RHOB MWD020 G/CM 4 1 68 16 5 DRHO MWD020 G/CM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 RPM MWD020 OHMM 4 1 68 28 8 RPS MWD020 OHMM 4 1 68 32 9 RPX MWD020 OHMM 4 1 68 36 10 FET MWD020 HOUR 4 1 68 40 11 GR MWD020 API 4 1 68 44 12 PEF MWD020 BARN 4 1 68 48 13 ROP MWD020 FT/H 4 1 68 52 14 NPHI MWD020 PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7147.5 8390 7768.75 2486 7147.5 8390 CALA MWD020 INCH 8.84 12.62 10.4017 2280 7150 8301 FCNT MWD020 CNTS 569.9 3524.9 880.544 2303 7147.5 8298.5 NCNT MWD020 CNTS 109267 191696 129662 2303 7147.5 8298.5 RHOB MWD020 G/CM 1.937 2.794 2.2513 2302 7161.5 8312 DRHO MWD020 G/CM -0.045 0.446 0.0293419 2302 7161.5 8312 RPD MWD020 OHMM 2.44 1239.81 10.443 2302 7185 8335.5 RPM MWD020 OHMM 2.04 824.68 10.0381 2302 7185 8335.5 RPS MWD020 OHMM 2.21 61.06 9.34168 2302 7185 8335.5 RPX MWD020 OHMM 2.17 33.07 8.62808 2302 7185 8335.5 FET MWD020 HOUR 0.21 21.6 1.82053 2302 7185 8335.5 GR MWD020 API 23.38 110.94 75.4955 2303 7192.5 8343.5 PEF MWD020 BARN 1.28 6.01 2.33854 2302 7161.5 8312 ROP MWD020 FT/H 7.44 495.31 126.774 2304 7238.5 8390 NPHI MWD020 PU-S 8.05 47.85 32.1831 2303 7147.5 8298.5 First Reading For Entire File..........7147.5 Last Reading For Entire File...........8390 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF Tape Trailer Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Scientific Technical Services ~ ~ Next Reel Name...........UNKNOWN Comments .................STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File , ~ MPS0140052520075SN.tXt Sperry-Sun Drillin9 Services LIS Scan Utility $ttevi si on : 3 $ LiSLib $Revision: 4 $ Fri Sep 21 13:41:40 2007 Reel Header Service name .............LISTPE ~ate . ...................07/09/21 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comment5 .................STS LIS Writing Library. Tape Header Service name .............LISTPE ~ate . ...................07/09/21 Origin ...................5T5 Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Physical EOF comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNE55: MWD RUN 1 Mw0005043233 J. BOBBITT E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD ~ scientific Technical services ~ibrary. scientific Technical services MPS-OlA 500292314101 BP Exploration sperry ~rilling services 25-7U~-07 MWD RUN 2 Mw0005043233 J. BOBBITT G. BURLY 7 12N 11E 3375 4714 72.04 38.30 Page 1 ~o~ -o3y '~ ~~-~a ~ ~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: MPSOlA005252007S5N.tXt OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 10.750 3140.0 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (ND). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A CEMENT PLUG, THE TOP OF WHICH WAS AT THE 10.75~~ CASING SHOE (3140~MD/2375' ND) IN THE MPS-O1 WELLBORE. 4. MWD RUNS 1,2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), ACOUSTIC CALIPER (ACAL), AND PRESSURE WHILE DRILLING (PWD). ROTATED ALD DATA OVER SLIDE INTERVALS BELOW ABOUT 6450'MD WERE ACQUIRED AFTER DRILLING THE INTERVALS. THESE MAD DATA WERE MERGED WITH THE MWD DATA. 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO THE SPERRY DRILLING SERVICES MWD GAMMA RAY LOG FROM MPS-O1. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON $ JUNE 2007, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST). THE SHIFTED GAMMA RAY LOG IS CONSIDERED PDC FOR MPS-OlA PB1. 6. MWD RUNS 1,2 REPRESENT WELL MPS-OlA WITH API#: 50-029-23141-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8390'MD/4490~TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. Page 2 ~ ~ MPSOlA005252007SSN.tXt CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZES: ACAL-DERIVED (BIT SIZE 9.875~~) MUD WEIGHT: 8.8 - 9.5 PPG MUD SALINITY: 1000 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD ~epth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2808.0 8339.5 FCNT 3126.5 8294.5 PEF 3126.5 8308.0 NCNT 3126.5 8294.5 RPM 3126.5 8331.5 RHOB 3126.5 8308.0 NPHI 3126.5 8294.5 DRHO 3126.5 8308.0 RPx 3126.5 8331.5 RPD 3126.5 8331.5 RPS 3126.5 8331.5 FET 3137.0 8331.5 rtoP 3141.5 8386.0 ALA 3152.0 8297.0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 2808.0 2800.5 2809.5 2802.0 2812.5 2804.5 2819.5 2815.0 Page 3 ~ 2827.5 2832.5 2840.5 2843.0 2848.0 2853.5 2885.5 2897.0 2911.5 2930.0 2967.5 3008.0 3020.5 3026.5 3032.5 3067.0 3073.0 3077.5 3089.0 3092.0 3109.5 3117.5 3128.0 3141.0 3146.0 8386.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MWD 1 MWD 2 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type... ..........0 ~ata Specification Block 7'ype.....0 Log~ing Direction .................DOwn Optical log depth units...........Feet ~ata rteference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined absent value ......................-999 ~epth units. . .. .. ..... Datum Specification Block sub-type...0 ~ Name service order units size Nsam rtep Code offset Channel DEPT FT 4 1 68 0 1 CALA MWD INCH 4 1 68 4 2 FCNT MWD CNTS 4 1 68 8 3 NCNT MWD CNTS 4 1 68 12 4 RHOB MWD G/CM 4 1 68 16 5 DRHO MWD G/CM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 RPM MWD OHMM 4 1 68 28 8 RPS MWD OHMM 4 1 68 32 9 RPX MWD OHMM 4 1 68 36 10 FET MWD HOUR 4 1 68 40 11 GR MWD API 4 1 68 44 12 PEF MWD BARN 4 1 68 48 13 Page 4 MPSOlA005252007SSN.tXt 2819.5 2829.5 2834.5 2838.0 2841.0 2847.0 2882.5 2896.0 2907.5 2926.5 2965.0 3007.0 3019.0 3024.5 3031.5 3064.0 3070.5 3075.0 3086.5 3091.0 3106.0 3118.5 3133.0 3144.5 3150.0 8390.0 MERGE TOP MERGE BASE 2800.5 7238.0 7238.0 8390.0 ~ ~ MP501,400525200755N.tXt ROP MWD FT/H 4 1 68 52 14 NPHI MWD PU-5 4 1 68 56 15 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 2808 8386 5597 11157 2808 8386 CALA MWD INCH 8.8 12.84 10.3462 10268 3152 8297 FCNT MWD CNTS 401.82 3524.9 779.669 10337 3126.5 8294.5 NCNT MWD CNTS 98857 191696 124483 10337 3126.5 8294.5 RHOB MWD G/CM 1.042 2.861 2.10974 10364 3126.5 8308 DRHO MWD G/CM -2.586 0.446 0.0269569 10364 3126.5 8308 RPD MwD OHMM 0.54 2000 15.1891 10411 3126.5 8331.5 RPM MwD OHMM 0.41 2000 13.8898 10411 3126.5 8331.5 rtPS MwD OHMM 0.86 2000 13.9833 10411 3126.5 8331.5 RPx MwD OHMM 0.85 146.18 11.9548 10411 3126.5 8331.5 FET MwD HOUR 0.18 21.6 0.908663 10390 3137 8331.5 GR Mw~ API 6.1 120.68 64.9649 11064 2808 8339.5 PEF MwD BARN 0.38 12.31 2.21766 10364 3126.5 8308 ROP MwD FT/H 0.08 495.31 195.816 10490 3141.5 8386 NPHI Mw~ Pu-5 8.05 98.59 35.7534 10337 3126.5 8294.5 First rteading For Entire File..........2808 ~ast rteading For Entire File...........8386 File Trailer Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical rtecord..65535 File Ty e ................LO Next F~~e Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version -vumber. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.001 comment ttecord FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 2800.5 7192.0 RPS 3130.5 7184.5 NPHI 3130.5 7147.0 Page 5 # ~ MPSOlA005252007SSN.tXt RPx 3130.5 7184.5 RPM 3130.5 7184.5 FCNT 3130.5 7147.0 RPD 3130.5 7184.5 NCNT 3130.5 7147.0 PEF 3131.0 7161.0 DRHO 3131.0 7161.0 RHOB 3131.0 7161.0 FET 3141.0 7184.5 RoP 3145.0 7238.0 CALA 3156.0 7149.5 $ # LOG HEADER DATA DATE LOGGED: 23-MAY-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7238.0 TOP LOG INTERVAL (FT): 3145.0 BOTTOM LOG INTERVAL (FT): 7238.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 63.2 MAXIMUM ANGLE: 70.5 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RESIS. 4 230203 CTN COMP THERMAL NEUTRON 174114 ALD Azimuthal Litho-Dens 224807 ACAL Acoustic Caliper $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3140.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.15 MUD VISCOSITY (S): 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 4.400 72.0 MUD AT MAX CIRCULATING TERMPERATURE: 3.350 96.8 MUD FILTRATE AT MT: 3.400 72.0 MUD CAKE AT MT: 4.600 72.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORREtTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ Page 6 ~ ~ MPSOlA00525200755N.tXt # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type....,0 Log~ing Direction .................DOwn Optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. . .. .. ..... Datum Specification Block sub-type...0 Name service order units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 CALA MWDO10 INCH 4 1 68 4 2 FCNT MWDO10 CNTS 4 1 68 8 3 NCNT MWDO10 CNTS 4 1 68 12 4 RHOB MWDO10 G/CM 4 1 68 16 S DRHO MWDO10 G/CM 4 1 68 20 6 RPD MWDO10 OHMM 4 1 68 24 7 RPM MWDO10 OHMM 4 1 68 28 8 RPS n~wD010 OHMM 4 1 68 32 9 RPX MWDO10 OHMM 4 1 68 36 10 FET MWDO10 HOUR 4 1 68 40 11 GR MWDO10 API 4 1 68 44 12 PEF MWDO10 BARN 4 1 68 48 13 ROP MWDO10 FT/H 4 1 68 52 14 NPHI MWDO10 PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2800.5 7238 5019.25 8876 2800.5 7238 CALA MWDO10 INCH 8.8 12.84 10.3304 7988 3156 7149.5 FCNT MWDO10 CNTS 401.82 1493.67 750.779 8034 3130.5 7147 NCNT MWDO10 CNTS 98857 150932 123001 8034 3130.5 7147 RHOB MWDO10 G/CM 1.042 2.861 2.06934 8061 3131 7161 DRHO MWDO10 G/CM -2.586 0.297 0.026266 8061 3131 7161 RPD MWDO10 OHMM 0.54 2000 16.3152 8109 3130.5 7184.5 RPM MWDO10 OHMM 0.41 2000 14.9887 8109 3130.5 7184.5 RPS MWDO10 OHMM 0.86 2000 15.2242 8109 3130.5 7184.5 RPx MWDO10 OHMM 0.85 146.18 12.9006 8109 3130.5 7184.5 FET MwD010 HOUR 0.18 7.62 0.649048 8088 3141 7184.5 GR MWDO10 API 6.1 120.68 62.124 8784 2800.5 7192 PEF Mw~010 BARN 0.38 12.31 2.18354 8061 3131 7161 RoP Mw~010 FT/H 0.08 429.63 215.224 8187 3145 7238 NPHI MWDO10 Pu-S 15.96 98.59 36.7713 8034 3130.5 7147 First tteading For Entire File..........2800.5 ~ast Reading For Entire File...........7238 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical Record..65535 File Type ................LO Next File Name...........5T5LIB.003 Page 7 ~ MPSOlA00525200755N.tXt Physical EOF File Header Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LIB.002 Comment Record FILE HEADER ~ FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 7147.5 8298.5 FCNT 7147.5 8298.5 NPHI 7147.5 8298.5 CALA 7150.0 8301.0 RHOB 7161.5 8312.0 DRHO 7161.5 8312.0 PEF 7161.5 8312.0 RPS 7185.0 8335.5 RPX 7185.0 8335.5 RPD 7185.0 8335.5 FET 7185.0 8335.5 RPM 7185.0 8335.5 GR 7192.5 8343.5 RoP 7238.5 8390.0 $ # LOG HEADER DATA DATE LOGGED: 25-MAY-07 SOFTWARE SURFACE SOFTWA RE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 8390.0 TOP LOG INTERVAL (FT): 7238.0 BOTTOM LOG INTERVAL (FT): 8390.0 BIT ROTATING SPEE D (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.3 MAXIMUM ANGLE: 67.2 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RESIS. 4 230203 CTN COMP THERMA L NEUTRON 174114 ALD Azimuthal L itho-Dens 224807 ACAL Acoustic Ca liper $ # Page 8 ~ ~ MPSOL40052520075SN.txt BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ~: # REMARKS: # Data Format Specification Record Data Record Type... ..........0 ~ata Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. . .. .. ..... Datum Specification Block sub-type...0 9.875 3140.0 Fresh water Gel 9.50 .0 8.0 600 6.0 4.600 72.0 3.270 104.0 6.000 72.0 5.000 72.0 Name service order units size Nsam rtep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD020 INCH 4 1 68 4 2 FCNT MWD020 CNTS 4 1 68 8 3 N~NT MWD020 CNTS 4 1 68 12 4 RHOB MWD020 GfCM 4 1 68 16 5 DRHO MWD020 G/CM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 RPM MWD020 OHMM 4 1 68 28 8 RPS MWD020 OHMM 4 1 68 32 9 RPX MWD020 OHMM 4 1 68 36 10 FET MWD020 HOUR 4 1 68 40 11 GR MWD020 API 4 1 68 44 12 PEF MWD020 BARN 4 1 68 48 13 ROP MWD020 FT/H 4 1 68 52 14 NPHI MWD020 PU-S 4 1 68 56 15 First Name Service Unit Min Max Mean Nsam Reading DEPT FT 7147.5 8390 7768.75 2486 7147.5 CALA MWD020 INCH $.84 12.62 10.4017 2280 7150 Page 9 LdSt Reading 8390 8301 ~ MPSOlA005252007SSN.txt ~J FCNT MWD020 CNTS 569.9 3524.9 880.544 2303 7147.5 8298.5 NCNT MWD020 CNTS 109267 191696 129662 2303 7147.5 8298.5 RHOB MWD020 G/CM 1.937 2.794 2.2513 2302 7161.5 8312 DRHO MWD020 G/CM -0.045 0.446 0.0293419 2302 7161.5 8312 RPD MWD020 OHMM 2,44 1239.81 10.443 2302 7185 8335.5 RPM MWD020 OHMM 2.04 824.68 10.0381 2302 7185 8335.5 RPS MWD020 OHMM 2.21 61.06 9.34168 2302 7185 8335.5 rtPx MWD020 OHMM 2,17 33.07 8.62808 2302 7185 8335.5 FET MwD020 HOUR 0.21 21.6 1.82053 2302 7185 8335.5 GR MWD020 API 23.38 110.94 75.4955 2303 7192.5 8343.5 PEF MwD020 BARN 1.28 6.01 2.33854 2302 7161.5 8312 RoP Mw~020 Fr/H 7.44 495.31 126.774 2304 7238.5 8390 NPHI MWD020 PU-S 8.05 47.85 32.1831 2303 7147.5 8298.5 First Reading For Entire File..........7147.5 ~ast rteading For Entire File...........8390 File Trailer Service name... .......STSL2B.003 Service Sub Level Name... version n-umber. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical rtecord..65535 File Ty e ................LO Next Fi~e Name...........STSLIB.004 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................07/09/21 Origin ...................STs Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN ~omments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE ~ate . ...................07/09/21 Ori 9in ...................STS Reel Name...... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS writing Library. Physical EOF Phy5lC11 EOF Scientific Technical services scientific Technical services End Of LIS File Page 10