Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-037~ t Well Histo File Co•r Pa e Image Pro~ec ry g XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p~ (~ ~-~~~ Well History File Identifier Organizing (done) RE AN Color Items: ~Greyscale Items: p Poor Quality Originals: ^ Other: NOTES: eY: Maria Project Proofing BY: Maria Scanning Preparat~on BY: Maria Production Scanning Stage 1 Page Count from Scanned File: (count aoes inciude cover sneet) Page Count Matches Number in Scanning Pr paration: ~YES NO BY: Maria Date: /s ~ /s/ 'M, p 7 9 ~ ' ~' 1 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: ~S~ Scanning is complete at this point unless rescanning is required. II I II II II I(I II I I III ReScanned II I II II I~ ~( III ( I III BY: Maria Date: ~S~ Comments about this file: Quality Checked III IIIIII III II') III ^ Two-sided III II'IIIIIIII (IIII DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: ~ate: Date: ^ Rescan Needed III IIIIII III) IIIII OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannabie) ^ Logs of various kinds: ^ Other:: ~ /s/ ~ ~ III II'IIII~III IIIII ~ /s/ ~ ~ _~_ x 30 = ~/~ + ~ = TOTAL PAGES~ (Count does not include cover sheet) Date: ~S~ IIIII~IIIIIIII IIIII -~~ 10/6/2005 Well History File Cover Page.doc E OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 11/26/2011 207 - 037 311 - 273 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 6/2/2007 50 029 - 23141 - 62 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 6/5/2007 MPS -01AL1 3375' FSL, 4714' FEL, SEC. 07, T12N, R11 E, UM 8. KB (ft above MSL): 72 04 15. Field / Pool(s): Top of Productive Horizon: Milne Point Unit / Schrader Bluff 1383' FSL, 4917' FEL, SEC. 05, T12N, R11 E, UM GL (ft above MSL): 38.3' Total Depth: 9. Plug Back Depth (MD +TVD): 3568' FSL, 3878' FEL, SEC. 05, T12N, R11 E, UM 3143' 2372' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD 16. Property Designation: Surface: x - 566077 y- 6000045 Zone ASP4 10500' 4397' ADL 025518 TPI: x 571111 y 6003379 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 572121 y 6005574 Zone ASP4 N/A 18. Directional Survey: ❑Yes El No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: DIR, GR, RES, NEU /DEN, MDT, USIT, CCL, PWD, IFR /CASANDRA 7923' 4296' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE To 1 BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20' 92# H -40 , 34' 112' 34' 112' 42" 260 sx Arctic Set (Aaarox.) 10 -3/4" 45.5# L -80 35' 3140' 35' 2371' 13 -1/2" 946 sx PF 'L'. 275 sx Class 'G' 7 -5/8" 29.7# L -80 3221' 7923' 2406' 4296' 9 -7/8" 653 sx Class 'G' 4 -1/2" 12.6# L -80 7918' 9919' 4294' 4371' 6 -3/4" Uncemented Slotted Liner 24. Open to production or injection? ❑ Yes IN No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2 ", 12.6 #, L -80 3625' - 7511' 7420' / 4103' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED 7296' 7459' Set EZSV (in tubing), Pump 107 Bbls of Cement I ; ; 5989' 7100' - 7104' Tubing Punch, Pump 18 Bbls Cement ,, i-s,; ` )- `, 5897' -5899' & 4491'4493' Punch Tubing & Jet Cut Tubing at 3625' 3143' 3384' Set EZSV & Pump K/O Plug w/ 41.3 Bbls Class 'G' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes IS No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None RECEIVED RBDMS DEC 0 9 20 D '1 7 2 V Form 10-407 Revised 12/2009 CONTINUED ON REVERSE E ' a, it & Gas Cans. Commissik Submit_ Original Only AgAn 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATIPESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. TSBC (Base OA) 8535' 4356' None TSBC (Base OA) 8760' 4364' Top of OA 9730' 4368' Top of OA 10016' 4377' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. 2/071"I Signed: Terrie Hubble 0 . If 4 Title: Drilling Technologist Date: MPS - AL1 207 - 037 311 - 273 Prepared By Nam&Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Dave Johnson, 564 -4171 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10 -404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 12/2009 Submit Original Only • MPS -01A / AL1, Well History (Pre Rig Sidetrack) Date Summary 10/08/11 WELL S/I ON ARRIVAL. DRIFTED TBG W/ 3.70" BARBELL, TEL, & S.BAILER, LOC TT @ 7487' SLM/ 7510' MD (23' CORR), S/D @ 7654' SLM/ 7677' MD (STICKY). CURRENTLY IN HOLE W/ 2.70 SHOCK ABSORBER, XO, DUAL SPARTECH GAUGES. 1st 3hr STOP @ 7377' SLM (7400' MD). 10/09/11 RAN SBHP PER PROGRAM. OPENED SSD @ 7369' MD. RAN 3.50" LIB, S/D @ 7658' SLM/ 7681' MD, GOT FAINT IMPRESSION OF FILL, RDMO. WELL S/I ON DEPARTURE. 10/09/11 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O= 200/0/200 PSI. TIE -IN TO TUBBING TALLY AT 7510' USING HORIZONTAL LINER SUMMARY DATED 06/02/2007. HALLIBURTON PLUG TO BE SET: 4 1/2" HES EZ DRILL -SVB SQUEEZE PACKER. OAW= 350 #, OAL= 25', MAX OD= 3.66 ". CCL TO MID ELEMENT = 7.7'. SET PLUG MID ELEMENT TO 7460' ACCORDING TO JEFF REA. TOP OF PLUG SET AT 7459', BOTTOM OF PLUT SET AT 7461'. GOOD INDICATION SEEN AT SURFACE. POOH, UN- STABBED, VISUAL CONFIRMATION THAT THE SETTING TOOL HAS FIRED. FINAL T /I /O= 150/0/200 PSI. JOB COMPLETE. WELL LEFT SI UPON DEPARTURE. 10/10/11 T /I /O =SSV /120/200, Temp =SI. PPPOT-T (PASS), PPPOT -IC (PASS), pre RST. PPPOT -T: Stung into test port (0+ psi), bled to 0 psi. Functioned LDS (ET style), all moved freely (1"). Unable to pump through void, single port. Pressured void to 5000 psi for 30 min test, lost 50 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT -IC: Stung into test port (0 psi). Functioned LDS (ET style), all moved freely (1"). Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. 10/10/11 T /I /0= 400/100/200 temp= SI Circ out Tx IA. CMIT Tx IA 2500 psi PASS [side track] Rigged up to IA and pumped 5 bbls neat, 291 bbls seawater, 100 bbls diesel down IA taking returns up Tubing and through F /L. Shut in wing and Pumped 2 bbls diesel to reach test pressures. CMIT Tx IA. T /IA lost 100/96 psi in 15 min's, 30/46 psi in 2nd 15 min's, for a total loss of 130/ 142 psi in 30 min's. Pumped additional 90 bbls diesel down IA while taking returns up Tubing and through F/L to freeze protect. Started U -tube. 10/11/11 Circ out well, CMIT -TxIA PASS, Freeze protect, Freeze protect flowline. U -tube Tbg x IA for 90 mins. Pumped 4 bbls neat down flowline for FP. Final WHPs= 0/0/200 10/18/11 Changout BOP's. Rebuild BOP's. MIRU. 10/19/11 Continue RU. Witnessed weekly full BOP test. RIH w/ HES Star Guide w/ knuckle joint. Stab into HES cement retainer w/ star guide. Establish circulation into reservoir (lnj = 2.0 bpm @ 1250 psi). Pump 107 bbls of 15.8 ppg. Laid in 40 bbls of cement 1:1 attempt to circ into IA after 1 bbl behind pipe it locked up. Cleaned out cement to 7300'. Freeze protected well w / 38 bbls of 60/40 methanol. 10/20/11 Continue rigging down. Travel to SLB shop for safety tsand down. Job complete. 10/24/11 WELL S/I ON ARRIVAL. RUN KJ, 2.80" CENT & 2.25" DRIVE DOWN BAILER (mule flapper). S/D @ 2785' SLM, 3515' SLM, 3519' SLM RECOVER CEMENT. WELL S/I ON DEPARTURE. Pad Operator Notified. 10/26/11 General RU while wait on wind to subside (25 -32 mph) prior to raising mast. 10/27/11 RIH w/ BHA; 3.13" ctc, dfcv, 3.15" up jar, 3.38" disco, 3.13" circ sub, 3.15" motor, 3.7" diamond mill. (oal= 24.30'). Tag cmt stringer @ 3530. Mill thru, continue RIH tagging stringers at various depths. Tagged solid cmt @ 7296' , pump final sweep and start chase ooh. 10/28/11 Tubing punch 7100 -7104' CTM. Verify circ from tubing to IA and that 7 -5/8" was not penetrated. POH. LD tubing puncher, ASF. RIH w/ 2" nozzle. Park nozzle @ 7250'. Lay in 18 bbls 15.8 ppg cmt in tbg, open IA and circ 32 bbls cmt into IA. Pooh filling CTBS w/ diesel. Job complete. (notified AOGCC to witness BOP test due on 10- 30 -11) Page 1 of 2 • • MPS -01A / AL1, Well History (Pre Rig Sidetrack) Date Summary 10/29/11 WELL S/I ON ARRIVAL. RAN 2.69" CENT, 2' x 1 -7/8" STEM, 2.80" CENT, XO, SAMPLE BAILER. TAG CEMENT © 5989' SLM. RECOVERED 1 TEASPOON OF CEMENT. 10/30/11 DRIFTED TO 4000' SLM W/ 3.66" CENT, 2' x 1 -7/8" STEM, 3.79" CENT, SAMPLE BAILER. NO RESTRICTIONS. WELL S/I ON DEPARTURE. 11/01/11 T /I /O= 20/0/200 MIT -T to 3000 psi PASS. Lost 180 psi in the first 15 and 55 psi in the second 15 mins. Used 1.5 bbls 60/40 to achieve test pressure, bled back 1.5 bbls. Final WHPs= 20/0/200 11/09/11 T/1/0=0/VAC/0. Conducted PJSM. Verified barriers. R/U VR lubricator to FS IA. PT lubricator to 300 low & 3500 high (charted). Set 2" FMC VR plug. Tested VR plug to low & high. Removed IA & installed tapped blind flange w/ needle valve. PT flange to low & high (charted & recorded). Removed spool and actuated valve from BS IA. Installed integral to IA & blind to power fluid line. PT integral to low & high. Job complete. 11/14/11 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O = 20/100/0 PSI. WAIT ON CH2MHILL TO RIG DOWN HARD LINE IN FRONT OF WELL HOUSE. RIH WITH TUBING PUNCH TOOL STRING. SET DOWN DUE TO DEVIATION AT 4050'. POOH AND CHANGE TOOL STRING. RIH WITH SECOND TUBING PUNCH TOOL STRING. FINAL T /I /O = 20/0/500 PSI. 11/15/11 INITIAL T /I /O = 20/0/500 PSI. PUNCH TUBING FROM 5897'- 5899'. TAG TD AT 6021.4'. NO COMMUNICATION BETWEEN TUB AND IA. PUNCH TUBING FROM 4491'- 4493'. LRS VERIFIED COMMUNICATION BETWEEN TUB AND IA. JET CUT TUB AT 3625'. FINAL T /I /O = 30/30/0 PSI. WELL SHUT -IN UPON DEPARTURE. 11/15/11 T /I /0= 20/0/0 SI Pumped 7 bbls 60/40 to followed by 290 bbls FW to circ well out followed by 145 bbls heated diesel for FP. U -tubed DSL into TBG for a freeze protect. Pumped 6 bbls 60/40 meth down the flowline to freeze protect per the pad op. Pumped 3.36 bbls DSL down the IA to pressure up the TBG/ IA to 3000 psi ** *FAILED * ** 6th test. 15 min loss of 29/28 psi, 30 min loss of 24/24 psi. For a total loss of 53/52 psi, results inconclusive possibly due to thermal of wellbore fluids. Bleed pressure to 0 psi. Page 2 of 2 • • Q `N ' r$fi:*rti eri e a� 'A[.A S KA BP` .?ge t� Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3 -010WW C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: 72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/15/2011 12:00 - 00:00 12.00 MOB N WAIT PRE RELEASED FROM MPS-39 AND WAITING FOR PRE -RIG WORK ON MPS-01 TO BE COMPLETED. - MPU WELLS MIT IA/TUBING. - FAILED INITIAL MIT TEST. - MPU WELLS P&A MPS-07 PRIOR TO RIG MOVE. - MOVING IN CEMENT SILOS AND PREPPING FOR CEMENT JOB. RIG CREWS CONTINUE TO SERVICE AND CLEAN RIG. 11/16/2011 00:00 - 00:00 24.00 MOB N WAIT PRE CONTINUE WAITING FOR PRE -RIG WORK ON MPS-01 TO BE COMPLETED. - MPU WELLS P&A MPS-07 PRIOR TO RIG MOVE. RIG CREWS CONTINUE TO SERVICE AND CLEAN RIG. HELD SAFETY MEETING WITH BOTH RIG CREWS, WSL, TOOLPUSHER AND ADW SAFETY ADVISOR. - REVIEWED GWO RIG FLOOR ACTIVITIES SLIDE PACK. - DISCUSSED DROPPED OBJECTS - ENGAGED CREW IN DISCUSSIONS AROUND DROPPED OBJECT PREVENTION. 11/17/2011 00:00 - 00:00 24.00 MOB N WAIT PRE CONTINUE WAITING FOR PRE -RIG WORK ON MPS-01 TO BE COMPLETED. - MPU WELLS GROUP RE- TESTED IA/TUBING ON MPS-01 - TEST RULED INCONCLUSIVE. - PRE -SPUD MEETING FOR MPS -01 HELD WITH ANCHORAGE TEAM. 11/18/2011 00:00 - 12:00 12.00 MOB N WAIT PRE CONTINUE TO WAIT ON PRE -RIG WORK TO MOVE ON TO MPS -01. 12:00 - 15:00 3.00 MOB N WAIT PRE CONTINUE TO WAIT ON PRE -RIG WORK TO MOVE ON TO MPS -01. PRE -SPUD MEETING WITH RIG CREW. 15:00 - 20:30 5.50 MOB P PRE MOVE RIG OFF OF MPS-39 TO MPS -01. - PJSM WITH RIG CREW FOR DERRICK UP MOVE. - MOVE PITS TO MPS -01. - MOVE SUB OFF OF MPS -39. - PLACE RIG MATS AROUND MPS -01. - MOVE AND SPOT SUB ON MPS -01. 20:30 - 22:30 2.00 MOB P PRE SPOT PITS AND CUTTINGS BOX.. 22:30 - 00:00 1.50 MOB P PRE HOOK UP LINES TO PITS. SPOT OPEN TOP TANK. ACCEPT RIG AT 00:00. 11/19/2011 00:00 - 03:30 3.50 MOB P PRE CONTINUE TO TAKE ON 9.2PPG BRINE TO PITS. Printed 11/28/2011 11:31:44AM North rioa - ALASKA E3P Page 2 *Be* '4pirratio1I Sumrtlary " Repoli : , Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:00 0.50 MOB P PRE RIG EVACUATION DRILL AND AAR. - RIG CREW AND VAC TRUCK DRIVERS ON SITE REPORTED TO PRIMARY MUSTER AREA. - REVIEWED LIST OF PERSONNEL AND ALL WERE ACCOUNTED FOR. - DISCUSSED THE LOCATION OF THE ROSTERS AND MUSTER LOCATIONS ON PAD. 04:00 - 04:30 0.50 MOB P PRE HELD PRE -SPUD MEETING WITH RIG CREW. 04:30 - 06:00 1.50 BOPSUR P PRE RIG UP AND PERFORM MIT OF OA AND IA/TBG. - PJSM WITH RIG CREW. - PRESSURE TEST IA / TBG - 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - 3500 PSI HIGH FOR 30 CHARTED MIN. - LOST 30 PSI IN THE FIRST 15 MIN. - LOST 14 PSI IN THE SECOND 15 MIN. - PRESSURE TEST THE OA - ROLLING TEST OF 600 PSI FOR 5 CHARTED MIN. 06:00 - 07:30 1.50 BOPSUR P PRE RIG UP AND TEST WELL SUPPORT LUBRICATOR. - PJSM WITH RIG CREW AND MPU WELL SUPPORT CREW. - RIG UP LUBRICATOR. - PRESSURE TEST LUBRICATOR. - 250 PSI LOW FOR 5 CHARTED MIN. - 3500 PSI HIGH FOR 5 CHARTED MIN. - HAD TO CYCLE TREE VALVES AND BUMP PRESSURE UP 3 TIMES TO GET A TEST. - GOOD TESTS. 07:30 - 08:30 1.00 BOPSUR P PRE PULL BPV AND SECURE LUBRICATOR. 08:30 - 09:30 1.00 BOPSUR P PRE MONITOR WELL FOR 1 HOUR. 09:30 - 13:00 3.50 BOPSUR P PRE INSTALL TWC AND TEST. - TEST TWC FROM ABOVE. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - HAD TO BUMP UP PRESSURE 5 TIMES TO GET A HIGH PSI TEST. - TEST TWC FROM BELOW. - 250 PSI LOW AND 2500 PSI HIGH FOR 5 CHARTED MIN EACH. 13:00 - 15:00 2.00 BOPSUR P PRE NIPPLE DOWN AND LAY DOWN TREE. - INSPECT THREADS AND COUNT TURNS ON HANGER. 15:00 - 20:00 5.00 BOPSUR P PRE NIPPLE UP BOP STACK. - PJSM WITH RIG CREW. - INSTALL DSA AND PLACE STACK ON TOP OF TUBING SPOOL. - FABRICATE AND INSTALL A NEW RISER. 20:00 - 21:00 1.00 BOPSUR P PRE INSTALL 4 1/2" TEST JOINT AND FUNCTION TEST BOP. Printed 11/28/2011 11:31:44AM f?a a ,s#�!7 N:p r�ca: Ak:AS�CA;= B, 9. 3 'Operation` Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 BOPSUR P PRE TEST BOPE PER AOGCC REGULATIONS AND BP ADWOP POLICY. PRESSURE TESTED TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. - TESTED ALL CHOKE MANIFOLD VALVES (16 TOTAL). - MANUAL CHOKE AND MANUAL KILL VALVES. - HCR CHOKE AND HCR KILL VALVES. - FULL OPENING SAFETY VALVES (3 1/2" AND 4 "). - 4" DART VALVE. - AIR ACTUATED IBOP ON TOP DRIVE. - MANUAL IBOP ON TOP DRIVE. - UPPER 3 1/2" x 6" VBRS WITH 4 1/2" TEST JOINT. - LOWER 2 7/8" x 5" VBRS WITH 4 1/2" TEST JOINT. - SUPER CHOKE AND MANUAL BEAN CHOKE. - 250 PSI LOW AND 1600 PSI HIGH FOR 5 CHARTED MINUTES. CLOSING TIMES: - ANNULAR CLOSED IN 39 SEC. - UPPER VBRS CLOSED IN 6 SEC. - BLIND /SHEAR RAMS CLOSED IN 12 SEC. - LOWER VBRS CLOSED IN 6 SEC. TESTS WITNESSED BY BP WSL AND NABORS TOOLPUSHER. - AOGCC, JEFF JONES, WAIVED THE STATE'S RIGHT TO WITNESS THE TEST. Printed 11/28/2011 11:31:44AM ALASKA = BP P #9e 4 e+ North rlca =ALA Operation Summar Repot Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/20/2011 00:00 - 03:30 3.50 BOPSUR P PRE CONTINUE TEST BOPE PER AOGCC REGULATIONS AND BP ADWOP POLICY. PRESSURE TESTED TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. - TESTED ALL CHOKE MANIFOLD VALVES (16 TOTAL). - MANUAL CHOKE AND MANUAL KILL VALVES. - HCR CHOKE AND HCR KILL VALVES. - FULL OPENING SAFETY VALVES (3 1/2" AND 4 "). - 4" DART VALVE. - AIR ACTUATED IBOP ON TOP DRIVE. - MANUAL IBOP ON TOP DRIVE. - BLIND /SHEAR RAMS. - UPPER 3 1/2" x 6" VBRS WITH 3 1/2" AND 4 1/2" TEST JOINT. - LOWER 2 7/8" x 5" VBRS WITH 3 1/2" AND 4 1/2" TEST JOINT. - ANNULAR PREVENTER WITH 3 1/2" TEST JOINT. - SUPER CHOKE AND MANUAL BEAN CHOKE. - 250 PSI LOW AND 1600 PSI HIGH FOR 5 CHARTED MINUTES. CLOSING TIMES: - ANNULAR CLOSED IN 39 SEC. - UPPER VBRS CLOSED IN 6 SEC. - BLIND /SHEAR RAMS CLOSED IN 12 SEC. - LOWER VBRS CLOSED IN 6 SEC. PERFORMED AN ACCUMULATOR DRAWDOWN TEST. - 14 SEC TO 200 PSI. - 85 SEC TO FULL PRESSURE. - 5 BOTTLES WITH 2100 PSI. TESTS WITNESSED BY BP WSLAND NABORS TOOLPUSHER. - AOGCC, JEFF JONES, WAIVED THE STATE'S RIGHT TO WITNESS THE TEST. 03:30 - 04:30 1.00 BOPSUR P PRE RIG DOWN BOPE TEST EQUIPMENT. - BLOW DOWN ALL LINES. 04:30 - 05:30 1.00 BOPSUR P PRE PULL TWC. - PICK UP MPU WELL SUPPORT LUBRICATOR - TEST LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN. EACH. - PULL AND LAY DOWN TWC. - MONITOR WELL. - RIG DOWN LUBRICATOR Printed 11/28/2011 11:31:44AM • North *rim- ALASKA BP Page 5 Operation Summary: Report Common Well Name: MPS -01 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VVW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 06:30 1.00 BOPSUR P PRE RIG UP AND CIRCULATE OUT DIESEL FREEZE PROTECT FROM THE WELL. - PJSM WITH RIG CREW AND MUD ENGINEER. - CLOSE BLIND SHEAR RAMS. - LINE UP TO TAKE RETURNS TO OPEN TOP TANK. - CIRCULATE 150 BBLS DIESEL FREEZE PROTECT OUT OF THE WELL. - PUMPED A TUBING VOLUME AT 290 GPM; 780 PSI. - REDUCED PUMP RATE FOR REMAINDER OF CIRCULATION - 126 GPM; 125 PSI. 06:30 - 09:00 2.50 BOPSUR P PRE RIG UP TO PULL TUBING HANGER. - CHANGE ELEVATORS AND MAKE UP LANDING JOINT. - RIG UP SPOOLING UNIT FOR CONTROL LINE. - RIG UP POWER TONGS FOR PULLING TUBING. 09:00 - 09:30 0.50 PULL P DECOMP PULL TUBING HANGER FREE. - PJSM WITH RIG CREW AND FMC REPRESENTATIVE. - HANGER PULLED FREE AT 55K LBS. 09:30 - 10:30 1.00 PULL P ■- DECOMP BREAK OUT AND LAY DOWN TUBING HANGER. RIG UP TO CIRCULATE WELL CLEAN. 10:30 - 12:30 2.00 PULL P DECOMP CIRCULATE WELL CLEAN. - PUMPED A 25 BBL BARA -CLEAN SWEEP. - CHASED SWEEP WITH 9.2 PPG BRINE. - 126 GPM; 80 PSI. - BLOW DOWN LINES. - OBSERVE WELL FOR 10 MIN. - WELL STATIC. - CHANGE ELEVATORS TO 4 1/2" YC TO PULL TUBING. 12:30 - 19:30 7.00 PULL P DECOMP PULL AND LAY DOWN 4 1/2" TUBING. - FROM CUT AT 3625' MD. - UP WEIGHT = 52K LBS. - RECOVERED THE FOLLOWING: - (86) JOINTS 4 1/2" IBT TUBING. - STRING SALVAGED FOR REUSE AS KILL STRING. - 2 COUPLINGS WERE BAD AND REJECTED. - (1) CUT JOINT 4 1/2" TUBING. - 2.59'; CLEAN CUT. - (1) GLM ASSEMBLY. - (1) 'X' NIPPLE ASSEMBLY. - (45) COMPLETE CONTROL LINE CLAMPS. - (1) 1/2 CONTROL LINE CLAMP. - (91) CONTROL LINE PINS. - MONITOR WELL. - WELL STATIC. - RIG DOWN TUBING RUNNING EQUIPMENT. 19:30 20:00 0.50 BOPSUR P ■- DECOMP INSTALL 4" WEAR BUSHING. - RIUP D - RIG UP 4" DRILL PIPE ELEVATORS. - RIG UP TO PICK UP 4" HT -40 DRILL PIPE. Printed 11/28/2011 11:31:44AM -N rfti riCa'- Ai ASKA Page ef-e6- Dperatioar Summa Y,, PPP: . , • • • Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3 -010W N -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:30 0.50 CLEAN P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #1 AS FOLLOWS: - 6 3/4" USED BIT - 7 5/8" CASING SCRAPER - 43/4" BOOT BASKET - BIT SUB WITH FLOAT INSTALLED. - `XO' OVERALL LENGTH = 12.56 ". MAX OD= 6.75 ". 20:30 - 00:00 3.50 CLEAN P DECOMP RUN IN THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY, PICKING UP4" DRILL PIPE. - FROM 12' TO 2834' MD. - UP WEIGHT = 57K LBS; DOWN WEIGHT = 52K LBS. - FILLED THE DRILL STRING ON JOINT #90. - GREASED THE TOP DRIVE WASHPIPE. 11/21/2011 00:00 - 00:30 0.50 CLEAN P DECOMP CONTINUE TO RUN IN THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY, PICKING UP 4" DRILL PIPE. - FROM 2834' TO 3618' MD. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. - SET DOWN 5K LBS ON TUBING STUB. 00:30 - 01:00 0.50 CLEAN P DECOMP CIRCULATE THE WELL CLEAN. - CIRCULATED 3 BOTTOMS UP. - 550 GPM; 1650 PSI. 01:00 - 01:30 0.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH BHA #1, CLEAN OUT ASSEMBLY. - FROM 3618' TO BHA. - MONITOR THE WELL. - WELL IS STATIC. 01:30 - 03:30 2.00 CLEAN P DECOMP PULL AND LAY DOWN BHA #1, CLEAN OUT ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - TRACE AMOUNT OF SCALE IN THE BOOT BASKET. - CLEAN AND CLEAR RIG FLOOR. 03:30 - 05:30 2.00 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE UNIT. - PJSM WITH RIG CREW AND E -LINE CREW. - POSITION WIRELINE TRUCK AND RIG UP TO RUN E -LINE. 05:30 - 09:00 3.50 EVAL P DECOMP SURVEY WITH GYRO DATA CENTRALIZED GYRO -CAAT TOOL. - PJSM WITH RIG CREW, SCHLUMBERGER E -LINE CREW, AND GYRO DATA REPRESENTATIVE. - RUN IN THE HOLE WITH CENTRALIZED GYRO -CAAT TOOL TO 3515'. - SURVEY FROM 3515' TO SURFACE. Printed 11/28/2011 11:31:44AM Nttf� ,rica - ALA S BP :: Page Operation Summary RepoF Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 18:30 9.50 EVAL P DECOMP LOG WITH SCHLUMBERGER ISOLATION SCANNER WITH GPIT- GR -CCL. - RIG UP AND RUN IN THE HOLE. - LOG FROM 3575' TO SURFACE. WSL AND BP NS SUPERINTENDENT REVIEWED THE GWO PRESENTATION ON DROPPED OBJECTS AND RIG FLOOR ACTIVITIES WITH THE RIG CREW. 18:30 - 20:30 2.00 DHB P DECOMP RIG UP AND RUN IN THE HOLE WITH HALLIBURTON 7 5/8" EZSV ON SCHLUMBERGER E -LINE. - PJSM WITH RIG CREW, SCHLUMBERGER E -LINE CREW AND HALLIBURTON REPRESENTATIVE. - PICK UP AND MAKE UP EZSV. - WARM UP PACKER ELEMENT PRIOR TO RUNNING IN THE HOLE. 20:30 - 22:00 1.50 EVAL N WAIT DECOMP WAIT FOR LOGS TO BE PROCESSED, SENT TO TOWN AND REVIEWED. - ISOLATION SCANNER LOGS UPLOADED TO SCHLUMBERGER INTER -ACT WEBSITE. - ODE AND SCHLUMBERGER TOWN ENGINEER REVIEWED LOGS. - PICK 7 5/8" CASING CUT POINT AT 3230' MD. - PICK EZSV SETTING DEPTH AT 3335' MD. 22:00 - 00:00 2.00 DHB P DECOMP CONTINUE IN THE HOLE AND SET THE HALLIBURTON EZSV. - RUN IN THE HOLE AND CORRELATE WITH LOGGING RUN. - SET HALLIBURTON EZSV AT 3335' MD. - 7 5/8" CASING COLLAR LOCATED AT 3327' MD. - PULL OUT OF THE HOLE WITH SCHLUMBERGER E -LINE. 11/22/2011 00:00 - 01:00 1.00 DHB P DECOMP PRESSURE TEST HALLIBURTON EZSV AND 7 5/8" CASING. - 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - 3500 PSI HIGH FOR 30 CHARTED MIN. - INITIAL TEST REJECTED DUE TO THERMAL ISSUES. - PRESSURE STABILIZED FOR 5 MIN. - LOST 200 PSI OVER THE NEXT 8 MIN. - RIG CREW TURNED ON RIG FLOOR HEATER. - PRESSURE INCREASED 170 PSI IN 3 MIN. - PRESSURE STABILIZED. - REPEATED TEST. - GOOD TEST. - DID NOT LOSE ANY PRESSURE OVER 30 MIN. 01:00 - 02:00 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E -LINE CREW. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. Printed 11/28/2011 11:31:44AM Page 8 et-20 . • North rtca °ALASKA = BP P 9 Operation Summary Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:30 1.50 FISH P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA #2, MULTI - STRING CUTTER. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #2 AS FOLLOWS: - MULTI - STRING CUTTER FOR 7 5/8 ", 29.7 LB /FT. - 6.75" STABILIZER - (3) 4 3/4" DRILL COLLAR - 'XO' OVERALL LENGTH = 101.42'. MAX OD = 6.75 ". MIN ID = 0.625 ". 03:30 - 07:30 4.00 FISH P DECOMP RUN IN THE HOLE WITH BHA #2, MULTI - STRING CUTTER, PICKING UP DRILL PIPE. - FROM 101' TO 3384' MD. - TAGGED EZSV AT 3384' DPM. - SET DOWN 5K LBS ON EZSV. 07:30 - 08:00 0.50 FISH N WAIT 3,382.00 DECOMP RIG CREW WAITING WHILE WSL AND ODE DISCUSSED PLAN FORWARD DUE TO TAGGING PLUG 49' DEEPER THAN INDICATED WHEN SET ON E -LINE. 08:00 - 13:30 5.50 FISH P DECOMP LOCATE COLLARS WITH CUTTER. - WORKED FROM 3268' TO 3221' ATTEMPTING TO LOCATE COLLARS. - LOCATED A COLLAR AT 3231' MD. 13:30 - 15:30 2.00 FISH P DECOMP POSITION CUTTER AND CUT 7 5/8" CASING. - POSITIONED STRING 10' ABOVE COLLAR LOCATED AT 3231' MD. - CUT 7 5/8" CASING AT 3221' MD. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. - 60 RPM; ROTATING WEIGHT = 60K LBS. - TORQUE = 2.2K FT -LBS. - STAGE PUMPS UP TO 294 GPM; 650 PSI. - CONFIRM CASING IS CUT. - PICK UP 2' AND RE- ESTABLISH CIRCULATION. - 210 GPM; 750 PSI. - OBSERVED A 385 PSI PRESSURE DROP ACROSS CUT DEPTH. 15:30 - 17:00 1.50 FISH P DECOMP DISPLACE OA FREEZE PROTECT WITH 9.2 PPG BRINE. - PJSM. - CLOSED THE ANNULAR AND OPENED THE OA TO THE OPEN TOP TANK. - CIRCULATE THROUGH CUT AT 126 GPM AND 360 PSI. - PUMPED 175 BBLS. 17:00 - 19:00 2.00 FISH P DECOMP LINE UP AND CIRCULATE TAKING RETURNS THROUGH THE GAS BUSTER AND BACK TO THE PITS. - MAX RATE THROUGH GAS BUSTER; 126 GPM; 403 PSI. - PUMPED 304 BBLS. 19:00 - 20:30 1.50 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA #2, MULTI - STRING CUTTER, STANDING BACK DRILL PIPE. - FROM 3221' TO 101' MD. Printed 11/28/2011 11:31:44AM North ric - ALASKA = 'E3P Page B- 'e- Operation Summary.Repor Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 FISH P DECOMP LAY DOWN BHA #2. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - LAY DOWN BHA AND CLEAR RIG FLOOR. 21:30 - 23:00 1.50 BOPSUR P DECOMP CHANGE UPPER PIPE RAMS TO 7 5/8" FIXED RAMS. - PJSM. - DRAIN STACK AND CLOSE BLIND / SHEAR RAMS. - CHANGE OUT UPPER PIPE RAMS. 23:00 - 00:00 1.00 BOPSUR P DECOMP TEST UPPER PIPE RAMS WITH 75/8" TEST JOINT. - RIG UP TEST EQUIPMENT. - INSTALL TEST PLUG. - FILL STACK. - MAKE UP AND RUN IN WITH THE 7 5/8" TEST JOINT. 11/23/2011 00:00 - 00:30 0.50 BOPSUR P DECOMP TEST 7 5/8" UPPER PIPE RAMS. - TEST TO 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - TEST TO 3500 PSI HIGH FOR 5 CHARTED MIN. - GOOD TEST. 00:30 - 01:00 0.50 BOPSUR P ■- DECOMP RIG ENT. LAY DOWN TEST JOINT. DOWN LINES. L 01:00 - 02:00 1.00 FISH P ■- DECOMP PICK UP BHA #3, 7 5/8" CASING SPEAR AS - PJSM WITH RI G CREW AND DBAKER FISHING REPRESENTATIVE. 02:00 - 03:00 1.00 FISH P DECOMP ENGAGE 7 5/8" CASING AND PULL FREE. - ENGAGE CASING WITH SPEAR. - BACK OUT LOCK DOWN SCREWS. - PULL CASING FREE. - WORK UP TO 200K LBS UP WEIGHT IN 25K LBS INCREMENTS. - BREAK CIRCULATION AT 126 GPM AND 60 PSI. - PULLED CASING FREE WITH 250K LBS. - PULLED HANGER TO FLOOR WITH 100K LBS. 03:00 - 05:00 2.00 FISH P DECOMP CIRCULATED A BARA -CLEAN PILL. - STAGED UP TO 550 GPM; 107 PSI. - PUMPED A 25 BBL BARA -CLEAN SWEEP. - CIRCULATED UNTIL RETURNS CLEANED UP. 05:00 - 05:30 0.50 FISH P DECOMP PULL AND LAY DOWN 7 5/8" CASING. - PULLED 4 JOINTS. - ALL 4 JOINTS WERE 7 5/8" TCII. RIG CREW WAS EXPECTING 7 5/8" BTC-M. - SAFETY JOINT AND XO'S WERE ALL SET UP FOR BTC-M. 05:30 - 06:30 1.00 FISH N HMAN - DECOMP WAITING FOR XO FOR WELL CONTROL. 06:30 - 11:30 5.00 FISH P DECOMP CONTINUE TO PULL AND LAY DOWN 7 5/8" CASING. - RECOVERED: - 80 FULL JOINTS. - 1 CUT JOINT 6.80' LONG. 11:30 - 12:00 0.50 FISH P DECOMP RIG DOWN CASING HANDLING EQUIPMENT. 12:00 - 13:00 1.00 REMCMT P DECOMP PICK UP TUBING HANDLING EQUIPMENT. Printed 11/28/2011 11:31:44AM N orth ric B'. Page 10 effie- r ., Uperat�on Summary Re„p�airt, ... Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 15:00 2.00 BOPSUR P DECOMP CHANGE UPPER PIPE RAMS. - FROM 7 5/8" FIXED RAMS TO 3 1/2" x 6" VBRS. 15:00 - 17:00 2.00 BOPSUR P DECOMP PRESSURE TEST UPPER PIPE RAMS. - RIG UP TEST EQUIPMENT. - INSTALL TEST PLUG. - MAKE UP 3 1/2" TEST JOINT. - PRESSURE TEST UPPER 3 1/2" x 6" VBRS WITH 3 1/2" TEST JOINT. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - GOOD TEST. - RIG DOWN 3 1/2" TEST JOINT. - MAKE UP 4" TEST JOINT. - PRESSURE TEST UPPER 3 1/2" x 6" VBRS WITH 4" TEST JOINT. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN EACH. - GOOD TEST. - RIG DOWN 4" TEST JOINT. - BLOW DOWN AND RIG DOWN TEST EQUIPMENT. 17:00 - 17:30 0.50 BOPSUR P DECOMP INSTALL 8.6875" ID WEAR RING. 17:30 - 18:30 1.00 REMCMT P DECOMP RIG UP 3 1/2" TUBING RUNNING EQUIPMENT AND SAFETY VALVE. 18:30 - 19:30 1.00 REMCMT P DECOMP PICKUP AND RUN IN THE HOLE WITH 16 JOINTS OF 3 1/2" NSCT TUBING. - FROM SURFACE TO496.52' MD. - TORQUE ALL CONNECTIONS TO 2800 FT -LBS. 19:30 - 20:00 0.50 REMCMT P DECOMP RIG DOWN TUBING RUNNING EQUIPMENT. - RIG DOWN POWER TONGS. - CHANGE ELEVATORS. 20:00 - 22:30 2.50 REMCMT P DECOMP RUN IN THE HOLE WITH CEMENT STINGER, PICKING UP 4 ", HT -40 DRILL PIPE. - FROM 496.5' TO 3384' MD. - TAG EZSV WITH 5K LBS AT 3384' MD. - PICK UP 2' TO 3382'. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 55K LBS. 22:30 - 00:00 1.50 REMCMT P DECOMP RIG UP TO PUMP CEMENT. - INSTALL CEMENT LINES. - RIG UP CEMENT HEAD. - BLOW LINES BACK TO SCHLUMBERGER CEMENTERS TO ENSURE LINES ARE CLEAR. Printed 11/28/2011 11:31:44AM North Orica - ALASKA - BP Page 11 of 6 Operation Summary Report . . Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: ©72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/24/2011 00:00 - 01:30 1.50 REMCMT P DECOMP PUMP CEMENT KICK -OFF PLUG. - PJSM WITH RIG CREW AND SCHLUMBERGER CEMENTERS. - BATCH UP 17.0 PPG, TYPE 'G' CEMENT. - YIELD = 1.00 CUFT /SK. - MIX WATER RATIO = 3.880 GAUSK. 00:50 - PUMP 5 BBLS 13.0 PPG MUDPUSH II. - 2.8 BPM AND 252 PSI. - SHUT DOWN PUMPS, CLOSE LOWER TIW VALVE. - PRESSURE TEST LINES TO 250/4000 PSI. - GOOD TEST. 01:07 - OPEN LOWER TIW VALVE AND PUMP 11.5 BBLS 13.0 PPG MUDPUSH II. - 2.6 BPM AND 183 PSI. 01:14 - LINE UP AND PUMP CEMENT. - PUMP 41.3 BBLS OF 17.0 PPG, TYPE 'G' CEMENT. - 4.4 BPM AND 1373 PSI. 01:23 - LINE UP AND PUMP 1.5 BBLS 13.0 PPG MUD PUSH II. - 1.8 BPM AND 69 PSI. 01:24 - LINE UP AND DISPLACE WITH 28.5 BBLS 9.2 PPG NACL BRINE. - DISPLACED WITH SCHLUMBERGER PUMPS. - 4.6 BBLS AWAY: 4.2 BPM AND 307 PSI. - 11.7 BBLS AWAY: 4.3 BPM AND 298 PSI. - 18.8 BBLS AWAY: 4.3 BPM AND 307 PSI. - 25.9 BBLS AWAY: 4.2 BPM AND 458 PSI. - 28.5 BBLS PUMPED. 01:32 - CEMENT IN PLACE. 01:30 - 02:00 0.50 REMCMT P DECOMP RIG DOWN CEMENT HEAD AND BLOW BACK LINES TO SCHLUMBERGER CEMENTERS. 02:00 - 02:30 0.50 REMCMT P DECOMP PULL OUT OF THE HOLE, STANDING BACK DRILL PIPE. - PULL 10 STANDS; FROM 3382' TO 2470' MD. 02:30 - 03:00 0.50 REMCMT P DECOMP DROP 5" WIPER BALL AND CIRCULATE TO CLEAN UP HOLE. - 550 GPM; 830 PSI. - TRACE AMOUNTS OF CEMENT BACK AT BOTTOMS UP. 03:00 - 04:00 1.00 REMCMT P DECOMP PULL OUT OF THE HOLE, STANDING BACK DRILL PIPE. - FROM 2470' TO 496' MD. 04:00 - 05:00 1.00 REMCMT P DECOMP RIG UP TO LAY DOWN 3 1/2" NSCT TUBING. - PJSM. - RIG UP TUBING HANDLING EQUIPMENT. 05:00 - 06:30 1.50 REMCMT P DECOMP PULL AND LAY DOWN 3 1/2" NSCT TUBING. - PJSM. Printed 11/28/2011 11:31:44AM North ; rica .ALASKA - - BF' Page 12of20 G 111 e ati � _ � � _ �� .: Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:00 0.50 REMCMT P DECOMP RIG DOWN TUBING HANDLING EQUIPMENT. - CLEAN AND CLEAR RIG FLOOR. 07:00 - 08:00 1.00 BOPSUR P DECOMP PULL WEAR RING AND INSTALL A LARGER ID WEAR RING. - PULL 8.6875" ID WEAR RING. - INSTALL 10.0" ID WEAR RING. 08:00 - 09:00 1.00 CLEAN N WAIT DECOMP WAIT FOR 10 3/4" CASING SCRAPER TO ARRIVE ON LOCATION. - AFTER DISCUSSING CEMENT LAB REPORT WITH ODE, THE DECISION TO RUN A 10 3/4" CASING SCRAPER WAS MADE. - WAITING FOR BAKER FISHING TO ARRIVE ON LOCATION WITH A CASING SCRAPER. 09:00 - 11:00 2.00 CLEAN P DECOMP PICK UP BHA #3, 10 3/4" CASING SCRAPER AND DRESS -OFF ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #3 AS FOLLOWS: - 9 7/8" BLADED CEMENT MILL. - 10 3/4" CASING SCRAPER. - BIT SUB. - 'XO'. - BUMPER SUB. -'XO'. - (3) 4 3/4" SPIRAL DRILL COLLARS. - 'XO' BACK TO HT -40. OVERALL LENGTH = 114.64'. MAX OD = 9.875 ". MIN ID= 2.250 ". 11:00 - 13:30 2.50 CLEAN P DECOMP RUN IN THE HOLE WITH BHA #3, PICKING UP 4" DRILL PIPE. - FROM 114' TO 2700' MD. 13:30 - 16:30 3.00 CLEAN P DECOMP WASH DOWN AND DRESS -OFF TOP OF CEMENT KICK -OFF PLUG WITH BHA #3. - WASH FROM 2700' TO 2911' MD. - 210 GPM; 185 PSI. - 20 RPM. - WASH THROUGH GREEN CEMENT STRINGERS. - SET DOWN UP TO 3K LBS FROM 2889' TO 2911' MD. - BEGAN TAKING CONSISTANT WEIGHT AT 2911'. - PICKED UP AND SET DOWN ON PLUG WITH NO ROTATION. - 210 GPM; 185 PSI. - SET DOWN 5K LBS AND TAG CEMENT PLUG. - PICK UP 60' AND CIRCULATE 25 BBL HIGH -VS SWEEP. 16:30 - 18:00 1.50 CLEAN P DECOMP PULL OUT OF THE HOLE WITH BHA #3, STANDING BACK DRILL PIPE. - OBSERVE WELL. - WELL IS STATIC. - PULL OUT OF THE HOLE WITH BHA #3. Printed 11/28/2011 11:31:44AM North Ohm - A :ASk<A'- `BP..: Pik 13 ef7?8 P 01 AFE No n W MPS -01 II Name: M e Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:30 1.50 CLEAN P DECOMP LAY DOWN BHA #3, 10 3/4" CASING SCRAPER AND DRESS -OFF ASSEMBLY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - LAY DOWN DRILL COLLARS. - LAY DOWN BHA PER BAKER FISHING REPRESENTATIVE. - SIGNS OF CEMENT IN BHA COMPONENTS. 19:30 - 00:00 4.50 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE UNIT TO RUN ISOLATION SCANNER. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. - SPOT E -LINE TRAILER AND TRUCK. - RIG UP SHEAVES AND TEST TOOLS. 11/25/2011 00:00 - 08:00 8.00 EVAL P DECOMP RUN IN THE HOLE WITH THE ISOLATION SCANNER WITH GPIT- GR -CCL ON SCHLUMBERGER E -LINE. - MADE MULTIPLE ATTEMPTS TO GET BLEOW 2670' SLM. - UNABLE TO GET DEEPER WITH CURRENT SET -UP. - LOG UP FROM 2670' SLM TO SURFACE. - AT 5 DEG / 6" HORIZONTAL/ AZMUTHAL RESOLUTION. - RUN BACK IN THE HOLE TO 600' SLM. - RE -LOG FROM 600' TO SURFACE. - AT 5 DEG / 1.5" HORIZONTAL/ AZMUTHAL RESOLUTION. 08:00 - 09:00 1.00 EVAL P DECOMP RIG DOWN ISOLATION SCANNER AND RIG UP TO RUN GYRO -DATA CAAT SURVEY TOOL ON SCHLUMBERGER E -LINE. 09:00 - 14:30 5.50 EVAL P DECOMP RUN IN THE HOLE AND SURVEY WITH GYRO -DATA CAAT ON SCHLUMBERGER E -LINE. - FROM 2475' TO SURFACE. 14:30 - 15:30 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E -LINE. - PJSM WITH RIG CREW AND SCHLUMBERGER E -LINE CREW. 15:30 - 17:00 1.50 DHB P DECOMP PRESSURE TEST 10 3/4" CASING AND CEMENT KICK -OFF PLUG. - PRESSURE TEST CASING AGAINST THE BLIND /SHEAR RAMS. - TEST TO 250 PSI LOW FOR 5 CHARTED MIN. - GOOD TEST. - TEST TO 2000 PSI HIGH FOR 30 CHARTED MIN. - LOST 216 PSI IN THE FIRST 15 MIN AND 194 PSI IN THE SECOND 15 MIN. - LOST 13 PSI PER MIN OVER THE FINAL 15 MIN TEST PERIOD. - LOST 410PSI IN 30 MIN. -- 19% OF MAXIMUM TEST PRESSURE. - PRESSURE TEST FAILED ALL THREE INTEGRITY TEST CRITERIA. - DISCUSSED WITH ODE AND NS SUPERINTENDENT. - DECISION WAS MADE TO LOCATE A RTTS AND RE -TEST CASING. - CONTINUE WITH PLAN FORWARD AND RE -TEST WITH BHA IN THE HOLE. Printed 11/28/2011 11:31:44AM ..:North rim -ALASKA � BP" Page 14- offite Operation Summary .impart ;:: Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010WW -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 22:00 5.00 DRILL P WEXIT PICK UP BHA #4, 8 3/4" DRILLING ASSY. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. - PICK UP BHA #4 PER SPERRY SUN DD AS FOLLOWS: - HUGHES MXL -1X MILL -TOOTH BIT. - 7" SPERRY SUN MUD MOTOR WITH 1.5 DEG BEND. - INTEGRAL BLADE STABILIZER. - DM COLLAR. - DGR COLLAR. - PWD - ADR COLLAR. - HCIM COLLAR. - ALD COLLAR. - STABILIZER. - CTN COLLAR. - HOC. - FLOAT SUB WITH PORTED FLOAT. - (3) FLEX COLLARS. - (3) 5" HWDP. - DRILLING JAR. - (8) 5" HWDP. - XO TO HT -40. OVERALL BHA LENGHT = 581.57'. MOTOR REV /GAL = 0.33. MAX FLOW RATE = 650 GPM; MAX 80 RPM. 22:00 - 22:30 0.50 DRILL P WEXIT RUN IN THE HOLE WITH BHA #4 ON 4" DRILL PIPE. - CHANGE ELEVATORS. - RUN IN 2 STANDS OF DRILL PIPE TO 796' MD. 22:30 - 00:00 1.50 DRILL P WEXIT PRESSURE TEST 103/4" CASING. - RIG UP TEST EQUIPMENT. - CHASE ICE PLUG IN CEMENT MANIFOLD. - RIG UP TO PUMP DOWN BOTH DRILL STRING AND KILL LINE. 11/26/2011 00:00 - 01:00 1.00 DRILL N WEXIT PRESSURE TEST 103/4" CASING. - PRESSURE UP TO 2000 PSI. - CALLED TEST AFTER 15 MIN. - LOST 200 PSI IN 15 MIN WITH NO SIGNS OF STABILIZATION. - RIG DOWN AND BLOW DOWN TEST EQUIPMENT. 01:00 - 05:00 4.00 DRILL N WEXIT PULL OUT OF THE HOLE AND STAND BACK AS MUCH OF BHA #4 AS POSSIBLE. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. 05:00 - 07:30 2.50 REMCMT N WEXIT PICK UP AND RUN IN THE HOLE WITH A HALLIBURTON 10 3/4" RTTS. - PJSM WITH RIG CREW AND HALLIBURTON REPRESENTATIVE. - PICK UP RTTS AND RUN IN ON 4" DRILL PIPE. - FROM SURFACE TO 2892' MD. Printed 11/28/2011 11:31:44AM North , rice ALASKA -: °B ' mega 1:6 Operation' $ummar4t Report Common Well Name: MPS -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 11/15/2011 End Date: X3- 010VWV -C: (3,914,700.00 ) Project: Milne Point Site: M Pt S Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 5/21/2007 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. UWI: 500292314100 Active Datum: MPS -01: @72.50ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 09:00 1.50 REMCMT N WEXIT SET RTTS AND PRESSURE TEST 10 3/4" CASING. - SET RTTS AT 2892' PER HALLIBURTON REPRESENTATIVE. - UP WEIGHT = 60K LBS; DOWN WEIGHT = 50K LBS. - PRESSURE TEST 10 3/4" CASING TO 250 / 2500 PSI FOR 30 CHARTED MIN. - LOST 15 PSI IN THE FIRST 15 MIN AND 6 PSI IN THE SECOND. - LOST LESS THAN 5 PSI / MIN IN THE LAST 15 MIN. - GOOD TEST. - BLEED OFF PRESSURE AND RELEASE RTTS. 09:00 - 10:30 1.50 REMCMT N WEXIT PULL OUT OF THE HOLE AND LAY DOWN THE 103/4" RTTS. 10:30 - 16:00 5.50 DRILL N WEXIT PICK UP AND RUN IN BACK THE HOLE WITH BHA #4, 8 3/4" DRILLING ASSY. - PJSM WITH RIG CREW AND SPERRY SUN DD AND MWD. - MAKE UP MOTOR AND BIT ASSEMBLY. - SHALLOW HOLE TEST AT 114' MD. - 450 GPM; 750 PSI. - LOAD SOURCE. - TO 581' MD. - UP WEIGHT = 55K LBS; DOWN WEIGHT = 55K LBS. 16:00 - 17:00 1.00 DRILL P WEXIT RUN IN THE HOLE WITH BHA #4. - FROM 581' TO 2839' MD. - UP WEIGHT = 72K LBS; DOWN WEIGHT = 52K LBS. 17:00 - 18:00 1.00 DRILL P WEXIT WASH DOWN TO TOP OF CEMENT. - FROM 2839' TO 2911' MD. - 450 GPM; 110 PSI. - 40 RPM; 3.7K FT -LBS TORQUE. - UP WEIGHT = 72K LBS; DOWN WEIGHT = 52K LBS. - ROTATING WEIGHT - 65K LBS. - TAGGED TOP OF CEMENT WITH NO ROTATION. - SET DOWN 25K LBS ON CEMENT. SLOW PUMP RATES: - TMD = 2933', TVD = 2364'. - PUMP 1 -- 2 BPM AND 50 PSI; 3 BPM AND 110 PSI. - PUMP 2 -- 2 BPM AND 50 PSI; 3 BPM AND 110 PSI. J kZ4 Printed 11/28/2011 11:31:44AM Tree; 4- 1/16" 5M FMC Orig. KB Elev. = 72 oyon 14) Wellhead; 11" x 4.5" 5M Gen 6 �S -01 A Orig. G L. Elev.= 38. 311IPOIDoyon 14) w/ 4.5" TC -II T &B Tubing Hanger 4" CIW "H" BPV profile J L 20" x 34" insulated, 215 #/ft A-53 I 80' GLM - 4.5" x 1" KBG -2 1 2404' -mac, Yr• Puts 3/43 7 " 3 PN2 \ ---41/ Er, 1 w HS 4.5" X Nipple 3.813" ID 1 2713 I � - Ezs v 4,+ '^ 3384 Tubing cut @ 3625' 10 3/4" 45.5 ppf L -80 BTC r (Drift ID = 9.794, cap. = .0961 bpf) ® ®®, Tubing punch @ 4491 -93' 10 3/4" Super Seal 11 Float Shoe 3140' , 00m Tubing punch © 5897 -99' (unable to circ) Slickline tagged cement @ 5989' slm 4 0, Estimated top of cement @ 6075' , " " „, wayµ °° 0 Tubing punch @ 7100' a ° ai Phoenix Discharge psi Gauge 1 7358' moil to W 0 f U HES 4.5" XD DURO Sliding 7369' Sleeve TC -11 1 11 Phoenix Jet Pump Gauge 1 7393` in 7409' .g a..ra, " "b HES 4.5" X Nipple 3.813" ID i • Baker 7 5/8" x 4.5" Premier Pkr. 4.5" TC -II 1 7420' 1 4.5 ", 12.6 #, L -80 IBT tbg. . ° ( cap. = .0152 bpf, id = 3.958) X0 pup 4.5" TC -II Box x 4.5" IBT Pin 7427' 3.958" ID 7 5/8" 29.7 ppf, L -80, BTC -mod production casing %, , HES EZ Drill Cement Retainer © 7459' ( drift lD= 6.750 ", cap. = 0.0459 bpf) 7 5/8" 29.7# L -80 XO (TC -II x IBT) @ 6937' ali ffinn HES 4.5" X Nipple 3.813" ID 1 7489' 1 MII Wireline entry guide 1 7510' 1 RA Tag @ 7870' Q, Hook Wall Hanger Inside 7 5/8" Casing @ 7918' as , KOP @ 400' ��L, 6 3/4" hole TD @ 10500' / Baker shoe @ 9919' 53+ degree from 1950' p 4.1 ,: Max hole angle = 70.5 degree @ 3871' a> ," " " "' .14 As 62 degree @ Sleeve 20 jts. 4:5'12.6# L 80 I9 Slotted liner 8882'- 9669' OA' San is 1s Its.€4.512.6 #L8019T7948 - ,8466'. U Window in 7 5/8" csg @ 7923 - 7935' MPS -01A L1 -Q Baker Swell Pkr. (Oil Sensitive) @ 8643' and 8728' Well angle © window is 67° '� Baker Swell Pkr. (Water Sensitive) @ 9759' and 9822' (0 2- Baker ECP's @ 9940' and 10,020' 2- HES Float Collars @ 10,127' Baker "HRD" ZXP Liner Top Packer 7,961' HES Float Shoe @ 10,130' Baker "RS" Seal Sub 7,980' Baker 7 -5/8 x 5 -1/2" HMC Hyd. Liner Hng. 7,983' Baker seal bore rspt. 7,989' - ' ' - 1:4:c 4.5" HES X- Nipple ( 3.813 ") 1 8,021' I r s. WLEG 1 8,021' 1 `-.-- 7 -5/8" Halliburton Float Collar 8292' `OB' Sands 7 -5/8" Halliburton Float Shoe 8376' 4 Not Perforated , DATE REV. BY COMMENTS M I LN E POINT UNIT 04/16/03 MDO Initial Drill & Complete Doyon 14 WELL S -01 A 06/10/07 REH Sidetrack Drill /Complete Doyon 14 API # 50- 029 - 23141 -62 -00 BP EXPLORATION (AK) • • - 1 KE 3 SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. 0 7- 0 3 P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Milne Point Field, Schrader Bluff Oil Pool, MPS -01AL1 Sundry Number: 311 -273 Dear Mr. Allen: t ;.; j SV P z 5 Z(, Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the , 1, next working day if the 23rd day falls on a holiday •r weekend. Sinc: el 410, 1 Jo K. or .n Co is • sioner DATED this day of September, 2011. Encl. STATE OF ALASKA i ' iI'' ALASKA •AND GAS CONSERVATION COMMISSI APPLICATION FOR SUNDRY APPROVAL �F f= 2011 20 AAC 25.280 1. Type of Request: lfi a OW & Gas Cm. Gemni6siofl t neiv),110,9 El Abandon - ® Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program-- ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. 0 Development ❑ Exploratory 207 -037 • 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 - 029 - 23141 - - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: MPS -01AL1 Spacing Exception Required? ❑ Ye o 9. Property Design ion: -10. Field / Pool(s): Abl ...WA2Si 7 ADL 0255104ISfO / /$' Milne Point Unit / Schrader Bluff 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10500' - 4397' 10500' 4397' None None Casing Length Size MD ND Burst Collapse Structural Conductor 78' 20" 112' 112' 1490 470 Surface 3105' 10 -3/4" 3140' 2371' 5210 2480 Intermediate 7892' 7 -5/8" 7923' 4294' 6890 4790 Production Liner 2001' 4 7918' - 9919' 4292' - 4369' 8430 7500 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 7948' - 9669' 4305' - 4369' 4 12.6# L - 80 7511' (a 7961 ' - 8053') Packers and SSSV Type: 7 - 5/8" x 4 - 1/2" Baker Premier Packer Packers and SSSV 7420' / 4080' MD (ft) and ND (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory 0 Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: September 12, 2011 ❑ Oil ❑ WINJ ❑ WDSPL Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG _ VSuspended / ' i 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dave Johnson, 564 -4171 Printed Name Kris Honas for Ken Allen Title Acting, Engineering Team Leader Prepared By Name/Number: Signature - �/ Phone 564 -4841 Date 9,. /- /1 Terrie Hubble, 564 -4628 Commission Use Only Conditions of approval: Noti Commission so that a representative may witness Sundry Number: 6 ) i ' ( 9 '( ❑ Plug Integrity OP Test ❑ Mechanical Integrity Test ❑ Location Clearance k- 35 ) psL /3 e" lest Other: � C -1. e4 ZSoa t a/i. /4tin ! e J Subsequent Form Required: let • 4 /v i / / i APPROVED BY : COMMISSIONER THE COMMISSION Date mi l/ •/ Appro v ed B y Form 7 '.') 7Tom,- • woos 2011 Submit In Duplicate dui 17 / ORIGINAL 4. 4 %line Point Well MPS -01A • A p. Schrader OA Horizontal Injector e e^ps' Sundry Notice MPS -01A, is a Long Term Shut -in well due to low oil rate and high water production. The proposed MPS -01 B rotary sidetrack is a slant, dual- string completion, Schrader Bluff OA and OBa injector. This will be a replacement for MPS -07i which was shut -in due to a casing leak and is inoperable. MPS -07 will also be abandoned. The MPS -01 B injector is part of a pattern development to provide waterflood support to producer MPE- 24A/AL1 in HU -14 in the Milne Point Unit. This injector will be drilled just south of the other injector in this pattern MPE -29i and maintaining stand -off from the failed injector MPS -07i which had a matrix bypass event with MPE- 24A/AL1. adjacent offset wells. Present Well Condition Summary Casing Length Description MD TVD Burst Collapse Conductor 112 20" X 34" Insulated 112 112 1490 470 Surface 3140 10 -3/4" 45.5# L -80 BTC 3140 2375 5210 2480 Intermediate 8139 7 -5/8" 29.7# L -80 BTC -mod 8376 4489 6890 4790 Liner 2629 4 -1/2" 12.6# L -80 IBT Slotted 7919 -9919 4304 -4380 Slotted Slotted Tubing 7510 4 -1/2" 12.6# L -80 IBT 7510 4132 8430 7500 Perf Depths (MD): None Perf Depths (ND): None Procedure Note: The original cement volume for the 7 -5/8 casing pumped on 5/30/2007 was 135.5 BBLS (653 Sacks) of 15.8 PPG slurry. Assuming 40% excess for hole washout, the the top of cement is estimated at 5920' MD. It is planned to bring cement up to 5900' MD inside the 7 -5/8" X 4 -1/2" annulus and inside the 4 -1/2" tubing Pre -Rig Operations 1. PPPOT -T and IC. Function all LDS. 2. Drift for cement retainer. Perform static bottom hole pressure survey. 3. Set cement retainer at 7450' MD. TBG punch. 4. Circ well. ✓ ( Z X h +�� V� tw 5. Sting into retainer with coil. Down squeeze 107 bbls of cement into lateral. 6. Lay in 64 in TBG and IA. TOC at 5900' MD. 7. Tag TOC. Pressure test Cement to 2500 psi. Drift for jet cut. 8. Jet cut TBG at 3600' MD. L__. —? a e ,,, (- P < e 5 + - 9. Set BPV Drilling Rig Operations 10. MIRU. NU BOPE and test. 11. Pull 4 -1/2" string from 3600' MD. 12. PU DP. RIH w/ casing scraper to 3400' MD. 13. RIH and set 7" bridge plug at 3320' MD. 14. Make mechanical cut at 3240' (below 10 -3/4" shoe) in 7 -5/8" casing. (4/6( 15. Circulate out OA freeze protect, pull and lay down 7 -5/8" casing. 16. RIH w/ tubing stinger on DP and lay a 17.0 ppg cement plug from 7 -5/8" stub to 200' inside 10 -3/4" casing shoe (estimated at 36 bbls). 17. Dress off cement and prep to drill MPS -01 B sidetrack as per drilling permit. (09+ ,4 e ' eCf i,"e nevvv frodf / °r' %k.,n 3bt q'nc/ 4 c,. c� a � 979 {r� '4 Op 8 Vii,, 9/1/2011 • • Current Completion 14- 1116 " - 5M FMC M PS-0 1 A Grip 1 9 Elev. = 72.50 (Doyon 14 Wellhead; 4.5" 5M Gen 6 Orig. Cam.. Elev.= 38.30' ( Doyon l4 w/4.5' TC -II T &B Tubing Hanger 4" C W 1.1" BPV profile . " x34" insulated. 215 41It A-58 ( 8C' l • G L M- 4 S" x V KB G -2 1 2404 1 1C 214" 45.5 ppt L -8t BTC (Drift ID =4.704,cap. =.C9&ltot HES 4.5" X Nipple 3.81 3' ID FAIN 1C 3r4" Super Sett 8 Float Shoe ram 4 1 "..., ... . E y l Phoenix Discharge psi Gauge ( 7358' 't1 l, t ' f { 1 t I HES 4.5" XD D URO Sliding Sleeve TC -11 1 7369' t. f f Phoenix Jet Pump Gauge 7393 �a HES 4.5" X Nipple 3.813' IDS Baker 7 5t8' x 4,5' Premier Pkr. 4.5" TC -II 1 7420 { 4.5 ", 12.64; L -8C IBT the (cap ■.C152kat,id ■81058) rr " 1 X0 pup 4.5'TC- ll Box x4.5 "IBTPm 1 7427 3 958` l0 7 518" 20.7 ppt, L-8C, BTC -mod production aaainp lir (drat 10 ■6.75C ", am, - (,(459bpf) snow HES 4.5 "X Nipple 3.813 ' ID MUNI 7 W29.78 L40 X O (TC-I1 k lBT) ® 8937' NW WreWte entry guide RA Tag 0 7874 0 Hook Walt Hanger treide 7 518' Caging 791$ KO P ® 400 8 34` hole TD 019600' 1 Baker One 6 9819 53+ degree from 1950 Max hole angle = 70.5 degree fp 3871 J 62 degree a Sleeve 'OA Sands 20 pa 4 5' 12 60 L-80 IBT Based liner 8482 - 9669 13 >ffi 4 5' 12 8$ L-80 ST 7948' - 8466 Window in 7 58" cag ® 7923 - 7935' MPS -01A L7 it Well angle It win dow is 67° Rama Swat Par. 401 &swivel0 88 and 8725 8akerSwea Mt Mater Sentievele 9759` and 9822 2- Baker ECFs 4 9343 and 10:020 2• tES Float Collins 10,127' Batter'HRl7 ZXP Later Top Packer 116MIIII HES float Shoe at 10.130 Baker 'RS' Seal Selo 7 983 Baker 7-518x 5-112 HMC Hyd. Liner +9 Baker seat bore rept. 4 1 4.5' HES X- Nipple ( 3.8131 M WLEG IMO 7 -518" Halibu bn F bat Collar 8292' OB' Sands 7- 518'Hailbuilon First Shoe 8376' A NotPerforated IL DATE REV. BY COMMENTS MLNE POINT UNIT 04/16/03 MDO Initial Drill & Complete Doyon 14 WELL S -09A 06/10/07 REH Sidetrack DrilwComplete Doyon 14 API# 50- 029 - 23141-62 -00 BP EXPLORATION (AK1 9 9/1/2011 • • Pre -Rig Abandonment Tree: 4- 1i16' -5M FMC MPS-01A Ong k8Elev. = 72.50' (Doyon 1 Weflead: 11' x 4.5" 5M Gen 6 Ong. GL. Elev.= 38.30' (Doyon 1 wi 4.5' T0-11 T& B Tubing Hanger - i 4" C NV 1-1' BPV prolite X" x 24•• rnsulsted, 218 4 A i2 1 8C' I III GLM -4.5'x 1'KSG -2 2404 { 1C 214" 48 ppt L-8C BTC IIII (DretID= F.7fr4,cap = .CP(1tpf) HES4.5'X Noble 3.813'ID 1 2713' I 1C 214" Super Seal II Float Shoe 12140 j A , 4.5' Tubing Cut I 3600 1 a F 59.70 MD Top o1 Ce ,ent Tubing &Annulus m x34 5E_.5 horn packer • • s ,a Phoenix Discharge psi Gauge 1 7358' 1 fa•i . HES 4.5' XD DURO SidingSieeve TC -11 1 7369 1 11 a f PhoenaJetPumpGauge 1 ?93 { w HES4.5 "XNippie3.813'ID { 7439 1 Baker 7 5:8' x 4.5' Premier Pkr. 4.5 7C -11 1 7420 1 4.5 - , 13£4.1 -8( IBTttg (caps C15Et pt, id at! PEB) X0 cub 45'TC- Il Box x45 ST Pin 1 7427 1 3958' ID 7 818" 7$ 7 ppt, L.BC, BTGrnod production easing . 4.5' Cement Retainer 7 453 1 c a p 7 Ur 29.711 L- 80X0(TGIIx181') 8937' HES 4.5 7 X Nipple 3.813' ID 1 7 489 I Wlreune entry gods 1 5' { .-----H . RA Tag g 7 O e F '07 BBLS3ICement • rs a H:Ak Wall Hanger Inside 7 S'?' 0ming g 7915 KDP :403 I ... • 2 14 nos TD *10503 Baser sloe *9319 53+ degree from 1950 Max hole angle= 73.5 ileg-ee: I # a 1 62 degree: Sleeve '(?A' Sands . 2016.4 S 1 BOEBTslit" Ime 8882 13 4 5' 1 69 L -80 1117 7948 - 8466. 4 Window in 7 5,6" cs r 9 23 - 7935' • MPS -01A Lt 9 • Bexa Swei Par iCH SennClei *2 2643 aid d 732 Well angle: window is 67° a BaserSnell Par Mier Serrvt,e1 * 97% *-K19822 s • 2- Balser ECPx * 9 9333 ad 1003 .. ♦ 2- HES FloetCoIe *10 127 Baker 'HRD'ZXPL,ner TOP Packer .9C, • HE,n Sim 101)0 Baker 'RS Sees Sub 7.95; Baker 7 -98x 5-1. HMC Hyd Lner rhg t i a Baker seal Pere rept ..983 45'HESX-Npoe :38131 I 8._2' 1 WL.EG 1 's-----.- 7 - 5 1 8" Ha abortion Float Collar 8292 OB' Sands 7 - 5'5' Hafburton Float Shoe 8376 . NoeParo�xd DATE PE/ BY ChdM1ENTS MILNE POINT UNIT MDO Initial Drill & Complete Doyon n 14 WELL S -01A 04/i 6!03 R Y 06/10107 REH Sidetrack DnIVComplete Doyon 14 API # 50-029-23141-62-00 BP EXPLORATION (AK) 10 9/1/2011 • • Final Abandonment f; 4- 1116' - 5M FMC MPS-01A Ong. f:6 Elev. = 72.50' (Doyon l4 Wellhead; 1 1 ' x 4.5" 5%1 Gen 6 Ong. GL Elev.= 38.30' (Doyon 143 wi4.5'TC -IIT &B Tubing Hanger 4 " CAN "H' BPV profile 2C "x insulated, 215 *t A - €2 8 �-- 2940' MD Top of Cement 1C 214" 45 5 pet L -8C BTG 36 EELS (DnfID= F704,rap = C0E1kph ' a • IC 214" Super Seal II Fla 71 Sha 1 14C' j * • 4( 4.5" Tubing Cut 1 5930 MD Tubmg A J 64 BBLS from o3 ke* • • Phoenix Discharge psi Gauge I 7358 1 • GOO ES 4.5' XD DURO Sliding Sleeve 7C -11 1 7369 1 —*. • D a Phoenix Jet Pump Gauge 1 7393 1 HES4.5'X hippie 3.813'ID 1 7409 sser 7 518' x 4.5' Premier Pkr. 4.5" TO-II 1 7423 .15 - , 12 E M. L -S C I B T tt 4 �� ;cap a C152kpf,'d•2P58) cup 45'iCii Box x45 18TPn 7427 1 '158" ID 1 7 518" 207 per, L- BC, BTC -mod production cacinu *4 — 4.5' Cement Retainer { drift 10.E.75C ", cap. .( C456bpi) 7 518 29.71FL- 80XO(TC- IIK IBT) 5037' HES 4.5 X Nipple 3.813' ID '+,_ -459 Wirehne entry guide 1 -5' • Hoek Wee Hanger tre+de 7 515' Casing ,g 191.8 KOP g 400 + 6 84 rot TD 010500 : Dater am* Pj 9319 53. degree from 1950 • Max hole angle = 70.5 degree - 3571 • a •� 62 degree a Sleeve DA Sands , 2J,3; 4 5' trait-50 (BT Si�ltedmac $882' 13 es 4 5' 12 63L-80 i9T 7946' - 8466. • • • • - e ". • . MPS -01A L1 Window In 7 5B csg a 7923 - 7935 • Baba&metPkr {01 SerrmE-rcl §8843' IJ Well angle . window is 67° 1! ! . Baiter sN+el Pkr {elder Sens417.e: g 9759' and 932 2 • 2 Baiter ECPs 9940 ad 1001; • • 2 HES Ftoa Cola's g 10 127 Baker'HRD ZXP Liner Tap Packer • HES mW.Sroe >; 1C 130 Baker 'RS' Seal Sub Baker 7 -98x 5 II2 HMG HO Liner rhg --_ a Baker seal borerspt Baal ..W._.. 45'HESX-Nicple {3812 ' 5.32' 1 WLEG ns. 2' 1 7-58" Hailburlon Float Collar 5292 08 Sands Ha F loat Shoe BS -C , DATE REV BY CC MMENTS MILNE POINT UNIT 34/16)03 MDO Initial DntI & Complete Doyon 14 WELL S -01 A 06/10/07 REH Sidetrack DnIVComplete Doyon 14 API # 50- 029. 23141 -62.00 BP EXPLORATION (AK) 11 9/1/2011 • ~. 1 ~ ~ .~i C~ p .. MICROFILMED 6/3 0/x 010 DO NOT PLACE ANY NEW. MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc ~ v ~wl ~ DATA SUBMITTAL COMPLIANCE REPORT 6/24/2009 Permit to Driil 2070370 Well Name/No. MILNE PT UNIT SB S-01AL1 Operator BP EXPLORATION (A~ASKI~ INC API No. 50-029-23141-62-00 MD 10500 ND 4999 Completion Date 6/10/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATI~N Types Electric or Other Logs Run: DIR, GR, RES, NEU/DEN, MDT, USIT, CCL, PWD, IFR/CASANDRA (data taken from Logs Portion of Master Well Data Maint Weli Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / iy e meairrmt rvumoer Name ~caie mea~a No 5tart Stop GH Received Gomments ~pt 15513 LIS Verification 2808 10496 Open 10/3/2007 US Veri, GR, RPS, FCNT, NCNT, RHOB, NPHI, FET, ~ ROP D C Lis 15513 "Induction/Resistivity 2808 10496 Open 10/3/2007 LIS Veri, GR, RPS, FCNT, NCNT, RHOB, NPHI, FET, ROP og Induction/Resistivity 25 Col 3145 10500 Open 11/3/2008 MD DGR, EWR, ROP, ~ ALD, CTN 6-Jun-07 I Log Induction/Resistivity 25 Col 2737 4398 Open 11/3/2008 TVD DGR, EWR, ROP, ALD 6-Jun-07 ED C 17119`Tduction/Resistivity 0 0 Open 91/3/2008 PDS, EMF and CGM D C Li / 15308 ~ i d i /R i i 2808 1 O 8/3l200 graphics for EWR logs. s n uct on es st v ty 0496 pen 7 pt 15308 LIS Verification 2808 10496 Open 8/3/2007 Well Cores/Samples Information: ~ ~ Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 6/24I2009 Permit to Drill 2070370 Well Name/No. MILNE PT UNIT SB S-01AL1 MD 10500 ND 4999 ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? !r/ N Analysis Y / N Received? Operator BP EXPLORATION (ALASF(A) INC Completion Status 1-OIL Current Status 1-OIL Daily History Received? ~ N Formation Tops ~ N API No. 50-029-23141-62-00 UIC N Completion Date 6/10/2007 Comments: Compliance Reviewed By: ____ _ Date: ~ ~ ~ ~ i~'EI.L L,OG 'I' ~1VII'T'T~, T'o: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: MPS-OIA+Ll ~ October 9, 2008 AK-MW-5043233 MPS-OlA+Ll : 2" x 5" MD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23141-01,62 2" x 5" TVD Resistivity & Gamma Ray Logs: 1 Color Logs 50-029-23141-01,62 Digital Log Images: 1 CD Rom 50-029-23141-01,62 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTIOIV OF: Sperry Drilling Services Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 907-273-3536 Date:,; . , ao~--a3~/ /~-~r ~- ~d~-o3~ r"~-lrq Signed: 3 ~.0 5e e~~e ~e wells UKf es5 ~e~~ a« ~C~ ~ae~s, i~Z~S a.- 4'1~t.0~~ 4v~e ~ O~,vt h- ~ r,5 !~D'~ q l lo~' i~-i5 ~ic1 e~ec~ 0,, 0~;'~"c~~ litl~ ~ (~ ~ ~ ~ WELL LOG TRANSMITTAL To: State of Alaska September 26, 2007 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs MPS-OlA L1 (Redo) AK-MW-5043233 1 LIS formatted CD with verification listing. API#: 50-029-23141-62 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 1 i' ~..._ _ _._ 3 _z ..~ Date ~ ~~ v ~~ ~ ~ ' -~bk i.. . , __ i...~ ; . ._ , BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Signed: ~D~- - ~3~ ~ c ~513 ~ ~ ~ STATE OF ALASKA ~- ~~~ ~--~~~~~`~/`~~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG =?~.J'. :i 0 2007 1a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 20AAC 25.105 zo,aa,c zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ~ Development ~~~~~C~~atory ^ Service ^ Stratigraphic 2. Operator Name: BP Expioration (Alaska) Inc. 5. Date Comp., Susp., or Aband 6/10/2007 12. Permit to Drill Number 207-037 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/2/2007 ~ 13. API Number 50-029-23141-62-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/5/2007- 14. Well Name and Number: MPS-01AL1 ' FEL, SEC. 07, T12N, R11 E, UM 3375 FSL, 4714 Top of Productive Horizon: 1383' FSL, 4917' FEL, SEC. 05, T12N, R11 E, UM 8• KB (ft above MS~): 72.04 ~ Ground (ft MSL): 38.6 15. Field / Pool(s): Milne Point Unit / Schrader Bluff Total Depth: 3568' FSL, 3878' FEL, SEC. 05, T12N, R11E, UM 9. Plug Back Depth (MD+~/D) 10500 4999 J 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 566077 y- 6000045 Zone- ASP4 10. Total Depth (MD+~/D) 10500 4999 16. Property Designation: ADL 025518 ~~ TPI: x- 571111 y- 6003379 Zone- ASP4 Total Depth: x- 572121 y- 6005574 Zone- ASP4 11. SSSV Depth (MD+~/D) N/A 17. Land Use Permit: 18. Directional Survey ~ Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1800' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIR, GR, RES, NEU/DEN, MDT, USIT, CCL, PWD, IFR/CASANDRA ~jjD I•Y//YQpi~J~ ~9~•?,3jvJd~-~E TI/~> „ 22. CASING, LINER AND CEMENTING RECORD CASING SETfING DEPTH MD SETTING DEPTH ND HOLE AMOUNT' WT. PER FT. GRApE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD ` PULLED - 20' 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set A rox. 10-3/4" 45.5# L-80 35' 3140' 35' 2371' 13-112" 946 sx PF 'L' 275 sx Class 'G' 7-5/8" 29.7# L-80 31' 31' 4296' 9-7/8" 653 sx Class '' 4-1l2" 12.6# L-80 7918' 9919' 4294' 4371' 6-3/4" Uncemented Slotted Liner 23. Open to production or inject ion? ~ Yes ^ No 24. TusiNC RECORo If Yes, list each i (MD+ND of Top & Bottom; Pe nterval open rforation Size and Number): Size ~EPTH SET MD PACKER SET MD 4-1/2" Slotted Liner 4-1/2", 12.6#, L-80 7511' 7420' MD ND MD ND 7948~ - 8466' 4305' - 4349~ 25. QCtD, FRACTURE, ~`iEMENT SQUEEZE„EtG. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 8883' - 9669' 4359' - 4369' Freeze Protected with 100 Bbls of Diesel ZF>. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): ~y,~ N/A p~ ~ ~, "~"•9~,,, ~ ~ ''t ?~ Date of Test: 7/4/2007 Hours Tested: 6 PROOUCTioN FoR TEST PERIOD OIL-BBL: 1.5 GAS-MCF: .25 WATER-BBL: 137 CHOKE SIZE: GAS-OIL RATIO: 169 Flow Tubing Press. 236 Casing Press: 2609 C,a~cu~a,Teo 24-HOUR RATE.• OIL-BBL: 6 GAS-MCF: 1 WATER-BBL: 548 OIL GRAVIN-API ~CORR~: 14.9 ZT. CORE DATA Conventiona! Core{s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results r 20 AAC 250.071. Ct1PAFLETlOt~J None S' BF~ JUL 1'7 ?DD7 ~.Q ~f~~ rt. ' `' ~ sion Form 10-407 Revised 02/2007 ~ R I G 1 N A~°NTINUED ~N REVERSE SIDE , e~~ ~ ~ ~~~~ ZS„ GEOLOGiC MARKERS ~LIST ALL FORMATIONS A RKERS ENCOUNTERED~: 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ~ No Permafr'ost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. TSBC (Base OA) 8535' 4356' None TSBC (Base OA) 8760' 4364' Top of OA 9730' 4368' Top of OA 10016' 4377' Formation at Total Depth (Name): Top of'OA' 10016' 4377' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondra St wman Title Technical Assistant Date ~ 1t~° MPS-01AL1 207-037 PreparedByName/Number. Sondra Stewman, 564-4750 Well Number Permit No. / A fOV81 NO. Dnlling Engineer: Dave JOhnson, 564-4171 (NSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). Irenn 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Ire~- 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Irenn 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Irenn 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Irenn 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-ln, or Other (explain). Irenn 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITenn 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Tree: 4-1/16" - 5M FMC KB elev. = 72.50' (Doyon 14) Wellhead~ 11" x 4.5" 5M Gen 6~ M PS-01 A ~. GL. elev.= 38.30' (Doyon 14) w/ 4.5" TCII T&B Tubing Hanger 4" CIW `H" BPV profile 20" x 34" insulated, 215 #Ift A-53 10 3/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. _ .0961 bpfl 10 3/4" Super Seai II Fioat Shoe 3140' I 7 5/8" 29.7 ppf, L-80, BTRC-mod production casing ( drift ID = 6.750", cap. = 0.0459 bpf ) 4.5", 12.6#, L-80 IBT tbg. ( cap. _ .0152 bpf, id =3.958 ) 7 5!8" 29.7# L-80 XO(TCII x IBT) @ 6937' KOP @ 400' 53+ degree from 1950' Max hole angle = 70.5 degree @ 3871' 62 degree @ Sleeve GLM- 4.5" x 1" KGB-2 2404' HES 4.5" X Nipple 3.813" ID 2713' Pheonix Discharge psi Gauge 7358' HES 4.5" XD DURO Sliding Sleeve TC-11 7369' Phoenix Jet Pump Gauge 7393' HES 4.5" X Nipp~e 3.813" ID 7409' Baker 7 5/8" x 4.5" Premier Pkr. 4.5" TC II 7420' XO pup 4.5" TC II Box x 4.5" IBT Pin 742~~ 3.958"ID HES 4.5" X Nipple 3.813" ID 7489' Wireline entry guide 7510' Hook Wal~ Hanger Inside 7 5/8" Casing @ 7918' 20 jts. 4.5" 12.6# L-80 IBT Slotted liner 8882' - 9669' 13 jts. 4.5" 12.6# L-80 IBT 7948' - 8466' MPS-01A L1 RA T8g @ 7870' Baker Swell Pkrs. (Oil Sensitive) @ 8643' and 8728' Baker Tie Back Sleeve 7885' Baker Swell Pkrs. (Water Sensitive) @ 9759' and 9822' Baker ZXP Liner Top Packer 7,892' 2- Baker ECP's @ 9940' and 10,020' Baker 7-5/8" x 5" HMC Liner Hanger 7,898' 2- HES Fioat Collars @ 10,127' ' HES Float Shoe @ 10,130 Baker "HRD" ZXP Liner Top Packer 7 961 ` Baker "RS" Seal Sub 7 980' Baker 7-5/8 x 5-1/2" HMC Hyd. Liner Hng. 7,gg3~ ~, a Baker seal bore rspt. ~ ggg~ °-~ ~: ~.~; ~~. - , . I 4.5" HES X-Nipple ( 3.813") 8 021` 7-5/8" Halliburton Float Collar 8292' 7-5/8" Halliburton Float Shoe 8376' DATE REV. BY COMMENTS 04/16/03 MDO Initiai Drill & Complete Doyon 14 06/10/07 REH Sidetrack Drill/Complete Doyon 14 MILNE POINT UNIT WELL S-01 A API # 50-029-23141-62-00 BP EXPLORATION ~AKZ ~ ~ Lega( Weil Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 5/15/2007 ~ 00:00 - 01:30 1.50 I MOB I P 01:30 - 04:30 3.00 MOB P 04:30 - 06:30 2.00 MOB P 06:30 - 14:00 7.50 MOB P 14:00 - 21:00 7.00 MOB P 21:00 - 00:00 3.00 RIGU P 5/16/2007 00:00 - 01:00 1.00 RIGU P 01:00 - 01:30 0.50 RIGU P 01:30 - 02:00 0.50 RIGU P 02:00 - 04:00 2.00 RIGU P 04:00 - 05:00 I 1.001 PULL I P 05:00 - 08:00 3.00 PULL P 08:00 - 10:00 2.00 PULL P 10:00 - 12:00 I 2.001 EVAL 12:00 - 14:30 ~ 2.50 ~ EVAL ~ P 15:30 - 21:00 5.50 BOPSURP 21:00 - 00:00 I 3.00 I BOPSUq P I5/17/2007 00:00 - 01:00 1.00 BOPSU~ P 01:00 - 02:00 1.00 BOPSU P 02:00 - 05:30 3.50 BOPSU P 06:30 - 07~30 I 1.00 BOPSU~ N I HMAN 07:30 - 08:30 1.00 BOPSU~ N HMAN 08:30 - 13:30 5.00 BOPSU N HMAN DECOMP Prepare rig for moving - Skid rig fioor from drlg position to move position DECOMP Trouble shoot steering problem - Move off Well MPH-14 - DECOMP Remove cellar doors - Heaters - Install back boosters DECOMP Repair rig moving / steering system - Right rear hinge DECOMP Move rig from MPH- Pad to MPS-01A DECOMP Remove rear boosters - Instali glycol heaters, cel~ar doors - Remove front boosters - frame - Position rig on pad for crab walk - Tum tires to drive on mats DECOMP Move rig over MPS-01A DECOMP Shim rig DECOMP Skid rig floor from move position to drig position DECOMP RU floor - Spot tiger tank - Rock washer - cuttings tank - BP's 110% tank for taking freeze protection - Berm rock washer, cuttings tank -(Accept rig ~ 04:00 hrs 5/16/2007) DECOMP OA 140 psi - IA 0 psi - Tubing 0 psi - Take on seawater - PU Lubricator - Pull BPV - RD Lubricator DECOMP RU circulating iines - Con't taking on seawater DECOMP Displace diesel freeze protection - Pump 40 bbls seawater down Annulus - Reverse hoses - Pump 150 bbis down tubing - Wait 30 mins for diesel to migrate - Pump additional 50 bbls - GPM 210 to 340 - PP 740 to 1500 psi DECOMP Install TWC - T'est from the top to 3500 - test good - Test from bottom 1000 psi - Test failed DECOMP Attemp to test TWC from bottom - Test failed - Pull TWC - Install new TWC - Test from bottom to 1000 psi - From top to 3500 - 5 mins each test - Chart - RD test equipment DECOMP PJSM - ND FMC tree - Secure tree in cellar DECOMP NU BOP's - 3' spacer spool - DSA - Cut down drlg nipple to accomodate tall stack - Install same - Remove choke 2' hose extension - Attempt to MU choke hose - Unsuccessful DECOMP PJSM - ND stack - Remove 3' spacer spool - Remove DSA - NU BOP stack and adapter - Install 1' choke hose extension - MU Choke hose - Weld / extend drig nipple - DECOMP MU choke to stack - Instail riser - Hook up flow line DECOMP RU testing equipment DECOMP Test BOP's - Annular 250 low 3000 high - 5 mins each test - Top VBR's 2 7/8" X 5" 250 low 3000 high - 5 mins each test - Tested with 4" and 4 1/2" test joints - Choke manifold - HCR Choke / Kill - Manuai Choke / Kill - Upper I L.ower IBOP - Floor safety valves - 250 low 3000 high 5 min each test - Perform Accumulator test - Test Blind rams 250 low 3000 high - All test witnessed by W SL - John Crisp with AOGCC waived witness of test - DECOMP RD testing equipment DECOMP PU lubricator - Close Annulus vatve - RD lubricator - 7own redirected BOP test to 4000 psi - Retest BOP's DECOMP RU testing equipment DECOMP Test BOP's - Annular 250 low 2500 high - 5 mins each test - Top VBR's 2 7/8" X 5" 250 low 4000 high - 5 mins each test - Tested with 4" and 4 1/2" test joints - Choke manifold - HCR Choke / Kili - Manual Choke / Kill - Upper / Lower IBOP - Floor safety valves - 250 low 4000 high 5 mins each test - Test Blind Printed: 6/11/2007 11:17:54 AM ~ ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 5/17/2007 08:30 - 13:30 5.00 BOPSU N HMAN DECOMP rams 250 low 4000 high - All test witnessed by WSL 13:30 - 14:00 0.50 BOPSU P DECOMP MU 1 joint Dp - Wash over TWC - Blow down Top Drive 14:00 - 16:00 2.00 BOPSU P DECOMP PU lubricator - Close Annulus valve - Break off XO - MU XO with rig tongs - MU lubricator to hanger - Pull TWC - RD lubricator 16:00 - 16:30 0.50 PULL P DECOMP MU DP and 2 XO's - Screw into hanger - BOLDS - Pull hanger to rig floor - MU T.D. 16:30 - 17:30 1.00 PULL P DECOMP Pump 40 bbls Safe Surf-O - Chase with 90 degree seawater - GPM 380 - PP 320 17:30 - 21:30 4.00 PULL P DECOMP PJSM - LD hanger - Landing joint - RU power tongs - LD 4 1/2" IBT 12.6# L-80 tubing - RD power tongs - Clear rig floor -(Total joints laid down 88) 21:30 - 22:30 1.00 BOPSU P DECOMP Install test plug - RU test equipment - Test lower VBR's 3 12/" X 6" - 250 low 4000 high 5 mins each test - Record on chart - RD testing equipment - Pull test plug - Install wear ring 22:30 - 00:00 1.50 CLEAN P DECOMP Moblize BHA to rig fioor - MU 6 1/8" bit - 7 5/8" casg scraper - boot baskets - Bit sub - Jar - DC's 5/18/2007 00:00 - 06:00 6.00 CLEAN P DECOMP RIH with 7 5/8" scraper - PU 4" dp 1 x 1 to 6566' 06:00 - 07:30 1.50 CLEAN P DECOMP CBU - 3 X- GPM 380 - PP 1550 - Cut Drlg line 07:30 - 10:30 3.00 CLEAN P DECOMP POH from 6566' 10:30 - 11:00 0.50 CLEAN P DECOMP LD BHA - Clear rig floor - Left Bit - Scraper - 1 Boot basket in hole 11:00 - 13:00 2.00 EVAL P DECOMP RU SWS E-line 13:00 - 21:00 8.00 EVAL P DECOMP RIH with USIT / GR / CCL to 6500' 21:00 - 22:30 1.50 EVAL P DECOMP LD USIT, GR, CCL - MU Howco 7 5/8" CIBP 22:30 - 00:00 1.50 EVAL P DECOMP RIH set 7 5/8" Bridge plug @ 3320' - POH 5/19/2007 00:00 - 00:30 0.50 EVAL P DECOMP RD - LD SWS 00:30 - 02:00 0.00 EVAL P DECOMP RU testing equipment - Test Howco CIBP & 7 5/8" Casg to 3000 psi for 15 mins - RD testing equipment - Blow down choke / kill line 02:00 - 03:30 1.50 PULL P DECOMP Moblize BHA to rig floor - MU Baker 7 5/8" Multi-string cutter 03:30 - 04:00 0.50 PULL P DECOMP Attempt to RIH - Would not pass wear ring - Pull wear ring - ID 6.625 - OD of stablizer 6.6875 - Pufl wear ring to con't trip in hole 04:00 - 06:00 2.00 PULL P DECOMP RIH - to 3300' - Tag bridge plug ~ 3320 - Put 20K on plug 06:00 - 07:00 1.00 PULL P DECOMP Locate 7 5/8" collars ~ 3256' - PU 20' to 3236' - Cut 7 5/8° casg-RPM65-2to4KTQ-GPM250-PP 11501CP-350 FCP-PU85-S085-ROT85 07:00 - 07:30 0.50 PULL P DECOMP Locate 7 5/8" collar - 3055' - PU 15' to 3040' - Cut 7 5/8" casg - RPM65-2to4TQ-GPM250-PP11001CP-500FCP 07:30 - 08:00 0.50 PULL P DECOMP Close 7 5/8" casg rams - Open annulus valves - Circulate out diesel freeze protect - GPM 315 - PP 950 - Flow check 08:00 - 09:30 1.50 PULL P DECOMP POH - LD Multi string cutter assy 09:30 - 11:00 1.50 EVAL P DECOMP Install test plug - Change top rams to 7 5/8" - Test door seals to 250 low 2500 high 5 mins each test 11:00 - 11:30 0.50 PULL P DECOMP PU / MU 7 5/8" spear assy 11:30 - 12:30 1.00 PULL P DECOMP Spear hanger - PU 25K to set spear - Circulate 30 bbl from OA to clear migrated diesel - GPM 240 - PP 440 - BOLDS - Pull hanger to rig floor - PU 120K 12:30 - 13:00 0.50 PULL P DECOMP Pump Safe Surf-O pill surface to surtace - 9.5 bpm - PP 130 13:00 - 14:00 1.00 PULL P DECOMP LD spear assy - Hanger - Pack-off 14:00 - 14:30 0.50 PULL P DECOMP RU to LD 7 5/8" casg 14:30 - 18:30 4.00 PULL P DECOMP POH LD 7 5/8" casg - Total laid down 73 joints + 28.96' cut Printed: 6/7 i/2D07 71:17:54 AM ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 • ~ Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 5/19/2007 14:30 - 18:30 4.00 PULL P DECOMP 18:30 - 19:30 1.00 PULL P DECOMP 19:30 - 21:30 2.00 PULL P DECOMP 21:30 - 22:30 1.00 PULL P DECOMP 22:30 - 00:00 1.50 PULL P DECOMP 5/20/2007 00:00 - 01:00 1.00 PULL P DECOMP 01:00 - 02:00 1.00 PULL P DECOMP 02:00 - 03:00 1.00 PULL P DECOMP 03:00 - 04:30 1.50 PULL P DECOMP 04:30 - 07:00 I 2.501 BOPSUp P I ! DECOMP 07:00 - 09:00 2.00 STCTPL P W EXIT 09:00 - 10:00 1.00 STCTPL P W EXIT 10:00 - 10:30 0.50 STCTPL P W EXIT 10:30 - 11:00 0.50 STCTPL P WEXIT 11:00 - 12:00 1.00 STCTPL P WEXIT 12:00 - 13:00 1.00 STCTPL P WEXIT 13:00 - 14:00 1.00 STCTPL P WEXIT 14:00 - 16:00 2.00 STCTPL P WEXIT 16:00 - 18:00 2.00 STCTPL P W EXIT 18:00 - 20:30 2.50 STCTPI P WEXIT 20:30 - 21:30 1.00 STCTPL P W EXIT 21:30 - 23:30 2.00 STCTPL P W EXIT 23:30 - 00:00 0.50 STCTPL P W EXIT 5/21/2007 00:00 - 01:00 1.00 STCTPL P WEXIT 01:00 - 01:30 0.50 STCTPL P WEXIT 01:30 - 03:00 1.50 STCTPL P W EXIT 03:00 - 04:30 1.50 STCTPL P W EXIT 04:30 - 06:00 1.50 STCTPI P WEXIT 06:00 - 07:00 1.00 STCTPL P W EXIT 07:00 - 08:00 1.00 STCTPL P W EXIT 08:00 - 08:30 I 0.50 I STCTPL I P I I W EXIT 08:30 - 15:30 I 7.00 I STCTPL I P I I W EXIT ~~~ A~ ~~ ~ I i:30 - 18:00 2.50 STCTPL P W EXIT joint Load BHA - strap - Moblize fishing tools to rig floor PU / MU Spear assy RIH with spear from 327 to 3040' tag casg top Set grapple - Jar on casg - Jar up to 185 over string weight (280) - Work string up to 400K 305K over string weight - Casg free - Attempt to circulate - Packed off - Pull one stand to 3104' - Break circulation CBU - GPM 240 - PP 260 - Flow check POH from 3104' to 327' Stand back DC's - LD Spear assy RU casg tools - ~D 7 5/8" casg - 4 total joints + 2 cut joints 12.9' & 21.9' Install tesY plug - RU testing equipment - Change 7 5/8" casg rams to VBR's 2 7/8" x 5" - Test rams to 250 low 4000 high 5 mins each test - Record on chart - RD testing equipment - Pull test plug - Install wear ring MU Muleshoe - RIH to 3300' - Wash to 3314' - Circulate - GPM 300 - PP 410 Give to Schlumberger with mule shoe @ 3302' Pump 2 bbls fresh water Test lines to 2500 psi Pump 20 bbls fresh water 49 bbis Class "G" at 17 ppg - Yield 1.01 - 272 sxs Pump 3 bbls water Displace 20 bbis seawater - 5.5 bpm C~3 430 Pull 7 stands to 2660' Install wiper ball - Circulate surface to surface GPM 318 - PP 450 - 3 bbls contaminated cement back POH - Break off mule shoe MU Mule shoe - RIH 7 stands from derrick - Install wiper ball - Pump surface to surface - 10 bpm ~ 200 psi - Rack back same - Break off mule shoe Lay down 6 3/4" and 4 3/4" DC's Change out saver sub on top drive PU 4" dp 1 X 1- from pipe shed Rack back 25 stands in derrick PU 4" dp 1 X 1- from pipe shed Rack back 15 stands in derrick Rack 4" DP in derrick PJSM - Moblize BHA to rig floor MU BHA - Bit - Motor - Float sub - Stablizer - MWD Up Load - MWD - Load Nukes Con't MU BHA - Flex Dc's - HWDp - Jars - HWDp RIH from 888' to 2660' Wash from 2660' to 2755' - Tag top of cement - GPM 450 - PP 1590-RPM50-TQ4K-CBU , RU testing equipment - Test casg to 2000 psi for 15 mins - ~ Record on chart - RD testing equipment Drill cement from 2755' to 3140' - RPM 50 to 60 - TQ 4 to 7K - WOB 20 - GPM 450 - PP 1640 - PUW 115 - SOW 80 - ROT 100 ~YYlP~-v i A ~ drill to kick off - from 3140' to 3180' - Printed: 6/17/2007 11:17:54 AM ~ ~ ~ Legal Weli Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING lNC. Rig Name: DOYON 14 I 5/21 /2007 15:30 - 18:00 2.50 I STCTPL I P Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 W EXIT 18:00 - 18:30 18:30 - 19:00 19:00 - 19:30 19:30 - 20:00 20:00 - 23:00 0.50 STCTPL P 0.50 STCTPL P 0.50 STCTPL P 0.50 STCTPL P 3.001 EVAL I P W EXIT W EXIT W EXIT W EXIT W EXIT 23:00 - 00:00 5/22/2007 00:00 - 02:00 1.OOI DRlLL P INT1 2.00 DRILL P INT1 02:00 - 02:30 0.50 DRILL P INT1 02:30 - 00:00 21.50 DRILL P INT1 ~ 5/23/2007 ~ 00:00 - 00:30 ~ 0.50 ~ DRILL ~ P ~ ~ INT1 00:30 - 02:00 1.50 DRILL P INTi 02:00 - 04:30 2.50 DRILL P INT1 04:30 - 05:30 1.00 DRILL P INT1 05:30 - 06:00 0.50 DRILL P INT1 06:00 - 07:30 1.50 DRILL P INT1 07:30 - 20:30 13.00 DRILL P INT1 20:30 - 22:30 2.00 DRILL N DFAL INT1 22:30 - 00:00 1.50 DRILI N DFAL INT1 5/24/2007 00:00 - 02:30 2.50 DRILL N DFAL INT1 02:30 - 03:30 1.00 DRILL N DFAL INT1 03:30 - 05:30 2.00 DRILL N DFAL INTi 05:30 - 08:00 2.50 DRILL N DFAL INT1 08:00 - 09:00 1.00 DRILL N DFAL INT1 09:00 - 10:30 1.50 DRILL N DFAL INT1 10:30 - 11:30 1.00 DRILL N DFAL INT1 11:30 - 13:00 1.50 DRILL N DFAL INT1 13:00 - 14:30 1.50 DRILL P INT1 drill to 3180 - Well side tracked - GPM 450 - PP 1640 - ROT 60 -TQ7K- CBU - GPM 450 - PP 1630 RPM 60 - TQ 5K Pull up to 3140 - Prepare pits for displacement PJSM - Displace seawater to LSND 8.8 ppg mud CBU2X-Cieanwell-GPM300to500-PP695to1500- RPM60-TQ5- RU testing equipment - Preform LOT - Mud weight 8.8 - MD 3150' - ND 2377' - Surface pressure 396 = EMW 12 ppg - RD testing equipment - Take SPR's - Blow down Directional Drill from 3180' to 3270' - WOB 10 - RPM 80 - TQ 6 -GPM450-PPon 1270-off-PUW 115-SOW 80-ROT100 Directional Drill from 3270' to 3435' - Increase in flow after connection - Flow check - No Flow - Gas / Air breaking out of mud - Fluid level dropped 5' in drlg nipple in 15 mins CBU -@ drilling rate - Flow check well - Well static Directional Drill from 3435' to 5925'. 500 gpm - 2590psi on btm - 2420 psi off btm - 80 RPM Torque on btm 9K off btm 6K - WOB 5k-25K. PU weight 150K SO weight 85K ROT weight 110K. Directional Drill from 5925' to 6001'. 500 gpm - 2590psi on btm - 2420 psi off btm - 80 RPM Torque on btm 9K off btm 6K - WOB 5k-25K. PU weight 150K SO weight 85K ROT weight 110K. Circulate bottoms up 2X. 500 gpm at 2450 psi. Rotated and reciprocated drill pipe 90'. Pumping out of hole with 500 gpm to casing shoe at 3140'. Hole tight from 5183'-5140' Circulate BU 3X at 3140'. Circulated large clay balis out of the hole. Casing clean. 500 gpm - 2070' 80 RPM at 5K torque. Blow down top drive. Monitor weli . Lubricate Top Drive, Biocks and Crown. Ran back to bottom and washed last stand to bottom. No problems. Directional Drill from 6001' to 7238'. Unable to pump up survey. MWD failed. 500 gpm - 3220 psi on btm - 3100 psi off btm - 80 RPM Torque on btm 10K off btm SK - WOB 20K. PU weight 180K SO weight 85K ROT weight 115K. Circulated 2X bottoms up. 500 gpm at 3080 psi. Rotate and reciprocate pipe full stand. 80 rpm at 8K torque. Pump out of hole at 500 gpm to 5908'. Finished pumping out of the open hole to the casing shoe at 3140'. Hole in good shape. 500 gpm at 2060 psi. Circulate casing clean 500 gpm at 2060 psi. Rotated and reciprocated drill pipe while cleaning up casing. 80 RPM at 6K torque. Monitor wefl - well static. Pump slug and pull out of hole. Unload nukes and download MWD. Changed out pulser and made up new bit. Upload MWD. Surface test MWD 470 GPM At 1130 psi. Install nukes Ran in hole to 10-3/4" casing shoe at 3140'. Cut and slip drill line. Service Top drive. Printetl: fi/l ULUU/ 11:1 /:S4 AM • ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 I5/24/2007 ~ 14:30 - 16:30 ~ 2.00 ~ DRILL ~ N ~ DFAL ~ INT1 16:30 - 00:00 I 7.501 DRILL I P 15/25/2007 100:00 - 10:00 I 10.001 DRILL I P I 5/26/2007 I 5/27/2007 10:00 - 13:00 13:00 - 18:30 18:30 - 19:30 19:30 - 21:30 21:30 - 00:00 00:00 - 01:00 01:00 - 01:30 01:30 - 02:30 02:30 - 08:30 08:30 - 09:00 09:00 - 09:30 09:30 - 10:30 10:30 - 11:30 11:30 - 14:30 14:30 - 16:00 16:00 - 17:00 17:00 - 18:30 18:30 - 20:00 20:00 - 20:30 20:30 - 23:00 23:00 - 00:00 00:00 - 01:30 3.00 DRILL P 5.50 DRILL P 1.00 DRILL P 2.00 DRILL P 2.50 DRILL P 1.00 DRILL P 0.50 DRILL P 1.00 DRILL P 6.00 DRILL P 0.50 DRILL P 0.50 DRILL P 1.00 DRIL~ P 1.00 DRILL P 3.00 DRILL P 1.50 EVAL P 1.00 EVAL P 1.50 EVAL P 1.50 EVAL P 0.50 EVAL P 2.50 EVAL P 1.00 EVAL P 1.50 EVAL P INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT7 INT1 INT1 INTi INT1 01:30 - 03:00 1.50 EVAL P INT1 03:00 - 08:30 5.50 EVAL P INT1 08:30 - 13:30 5.00 EVAL P INT1 Start: 5/15/2007 Rig Release: 6/10/2007 Rig Number: 14 Spud Date: 3/25/2003 End: 6/10/2007 Ran in hole with drilling assembly to bottom. Encounter tight spots at 4798', 5076', 5625', 6280', 6741'. Taking weight running in hole but with clean pick up. Appears to be pushing something downhole. Washed last stand to bottom. Directional Drill from 7238' to 7805'. 500 gpm - 3450 psi on btm - 3300 psi off btm - 80 RPM Torque on btm 11 K off btm 10K - WOB 15K. PU weight 187K SO weight 85K ROT weight 120K. Directional Drill 9 7/8" hole f/ 7805' to 8390' - GPM 500 - PP 3450 on bttm / 3300 psi off - 80 RPM - Torque on bttm 11 K/ off bttm 10K - WOB 15K - PUWT 187K - SOWT 85K - ROWT 120k Circulate hole clean - GPM 500 - PP 3420 psi - R&R - 80 RPM Monitor well f/ flow (static) - Pump out of hole f/ 8390' to 3140' - GPM450-PP3120psi Condition mud / CBU x 1.5 - GPM 500 - PP 2040 psi - R&R - 80 RPM RIH f/ 3140' to 8390' - Precautionary wash last stand to bottom (no hole problems encountered) Circulate and condition hole clean Cont. circulate well clean - GPM 500 - 3300 psi - R&R - 80 RPM Monitor well f/ flow for 15 min. - Mud aired up Condition mud with defoamer / turn off surface mixing equipment - CBU x 1- GPM 500 - PP 3300 psi Monitor well f/ 15 min. (well static) - Pump out of hole to shoe @ drill rate - GPM 480 - PP 3160 psi (no hole problems encountered) CBU X 1.5 C~ shoe - GPM 500 - PP 2060 psi - RPM 80 Check well f/ flow - Pump dry job - Blow down top drive POH w/4" drill pipe f/ 3140' to 875' Rack back HWDP in derrick - Flex collars - PJSM Pull nuke sources - Download MWD LD MWD tools - Stabilizer - Motor - Bit - Clear rig floor Mobilize SWS MDT string tools to rig floor - PJSM w/ SWS and all rig crew MU SWS Drill pipe conveyed MDT tools RIH w/ 4" drill pipe f/ 129' to 3140' PJSM w/ SWS - RU wireline sheaves in derrick Cont. RIH w/ 4" drill pipe f/ 3140' to 7030' (filled pipe every 20 stds) PJSM - RU side entry sub & wireline Break circ - RIH w/ latch head - Pump down DWCH w/ 220 gpm 460 psi - Observe pressure increase of 250 psi when latched - Function test tool - Secure W.L. to SES - Blow down T.D. RIH f/ 7030' to 7760' (btm of tool depth) - Correlate MW D& SWS Gamma data on depth - Test and calibrate tools - Position tool - Spot packer at 7755' - PUWT 155k - SOWT 85k Run open hole MDT's - Tool pressure stations ~ 7755' - 7951' - 7952 - 7958' - 7975' - 8009' - 8020' - 8019' - 8123' - 8124' - 8126'-8131'-8168'-8169' Move tool to OB Sample station @ Si61.7' - 8126.5' - 8120' - Printed: 6/11/2007 11:17:54 AM ~ ~ Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 5/27/2007 08:30 - 13:30 5.00 EVAL P INT1 13:30 - 19:30 6.00 EVAL P INT1 19:30 - 23:00 3.50 EVAL P INT1 23:00 - 00:00 1.00 EVAL. P INT1 5/28/2007 00:00 - 04:30 4.50 EVAL P INT1 04:30 - 07:30 3.00 EVAL P INT1 07:30 - 09:30 2.00 EVAL P INT1 09:30 - 10:30 1.00 INT1 10:30 - 12:00 1.50 EVAL P INT1 12:00 - 13:30 I 1.501 EVAL I P I I INTi 13:30 - 14:00 0.50 EVAL P INT1 14:00 - 17:30 3.50 EVAL P INT1 17:30 - 19:30 2.00 EVAL P INT1 19:30 - 20:30 1.00 CASE P INT1 20:30 - 21:30 1.00 CASE P INT1 21:30 - 23:30 2.00 CASE P INT1 23:30 - 00:00 0.50 CASE P INT1 5/29/2007 00:00 - 02:30 2.50 CASE P INT1 02:30 - 05:30 3.00 CASE P INT1 05:30 - 11:00 I 5.501 CASE I P I I INTi 11:00 - 11:30 0.50 CASE P INT1 11:30 - 12:00 0.50 CASE P INTi 12:00 - 12:30 0.50 CASE P INT1 12:30 - 13:00 0.50 CASE P INT1 13:00 - 14:00 1.00 CASE P INT1 14:00 - 14:30 0.50 CASE P INT1 14:30 - 15:30 1.00 CASE P INT1 15:30 - 18:30 3.00 CASE P INT1 18:30 - 21:00 2.50 CASE P INT1 21:00 - 00:00 3.00 CASE P INT1 5/30/2007 00:00 - 01:30 1.50 CASE P INT1 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 Set packer - Good seai - Failed sampte recovery, possible screen plugging Move MDT tool to OA sample station ~ 7946.3' - Set Packer - Good seal - Failed sample recovery Move MDT tool to OA sample station @ 7953.5' - Switch to non-screen probe recovery - Two sample bottles recovered successfully Move MDT tool to OB sample station ~ 8126' Move MDT tooi to OB sample station ~ 8126' - Three samples were filled ~ this station successfully (#2 sample bottle possibly did not seal properly) Move MDT tool to OB sample station @ 8167' - Several attempts - Failed sample recovery Move MDT tool - Take pressure readings @ 7697.6' - 7697' - 7669' POH to side entry sub @ 7030' Release wireline clamp f/ SES - Attempt to unlatch f/ tools unsuccessful - Loosen SES port - Slacked off on drill string / SES port lowered below rotary table - Circ ~ 2 BPM - PP 600 psi f/ 15 min. - Attempt to unlatch unsuccessful - Circ 5 BPM - PP 930 psi f/ 30 min. - Increased to 6 BPM - PP 1150 psi f/ 15 min. Shut down pumps - Pulled SES to rig floor - Attempt to unlatch - Successful Pull and spool wireline - LD latch head - Side entry sub - RD SWS wireline sheaves - Clear rig floor Flow check well f/ 15 min. (static) - Pump dry job POH w/ 4" drill pipe f/ 7030' to 129' LD SWS MDT tool assy. PJSM - MU 9 7/8" cleanout assy. - Bit - Sub - Float sub - Flex collars - Jars - HWDP RIH w/ 4" drili f/ 733' to 3100' (fill pipe every 20 stds) Cut and slip drilling line - Service top arive Cont. RIH w/ 4" drill pipe f/ 3100' to 4533' Cont. RIH w/ 4" driil pipe f/ 4533' to 8390' Circ and condition mud - GPM 520 - PP 3000 psi - PUWT 185k - SOWT 90k - ROTW 125k - R&R - 100 RPM - Off bttm torque 10k Flow check weli f/ 15 min. (static) - Pump out of hole f/ 8390' to the shoe @ 3140' - GPM 500 - PP 2300 psi CBU x 1@ casing shoe - GPM 520 - PP 2000 psi RIH 2 stands f/ 3140' to 3391 through kickoff section - Pulled back to shoe without pumping (Good) Check well f/ flow f/ 15 min. (static) - Pump dry job POH w/ 4" drill pipe f/ 3140' to 734' LD BHA - HWDP - Flex collars - Stabilizer - XOs - Bit Clear rig floor of vendor tools Pull wear bushing - Install test plug Change top rams to 7 5/8" - Test 250 psi low / 2500 psi high - each test 5 min. RU casing equip. - Change out bell guide - Grabbers - Bales Run 7 5/8" BTC-M 29.7# casing to 1400' PJSM - RD Double stack tongs - Slips - RU torque turn Printed: 6/11/2007 17:17:54 AM ~ ~ • Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: REENTER+COMPLETE Start: 5/15/2007 End: 6/10/2007 Contractor Name: DOYON DRILLING INC. Rig Release: 6/10/2007 Rig Name: DOYON 14 Rig Number: 14 5/30/2007 00:00 - 01:30 1.50 CASE P INT1 equipment to run TCII - Calibrate same 01:30 - 04:30 3.00 CASE P INT1 Cont. Run 7 5/8" 29.7# L-80 - TCII f/ 1400' to 3140' (shoe) 04:30 - 05:30 1.00 CASE P INT1 Circ and condition mud @ 10 3/4" shoe - GPM 250 - PP 400 psi - PUWT 120k - SOWT 95k 06:00 - 06:30 0.50 CASE P INT1 Run 7 5/8" csg 29.7# L-80 TCII f/ 3140' to 4100' (calculated pipe displacement 4.34 bbls - Actuai 1.0 bbl / Check surface pits / No problems found) 06:30 - 07:00 0.50 CASE P INT1 Monitor well - Break circulation - Slowly increased pump rate - Circulated and reciprocate 7/58" casing @ 4100' f/ 15 min. BPM 4- PP 320 psi (Observed slight losses @ start of circulating) 07:00 - 10:30 3.50 CASE P INT1 Run 7 5/8" TCII casing slowly f/ 4100' to 5810' (Calculated displacement 18 bbls / Actual 13.5 bbls) 10:30 - 11:00 0.50 CASE P INT1 Break circulation - Increase pump rate - Circulate and reciprocate 7 5/8" casing - BPM 4- PP 410 - PUWT 175k - SOWT 105k 11:00 - 15:30 4.50 CASE P INT1 Cont. run 7 5/8" 29.7# L-80 TCII casing slowly f/ 5810' to 8339' - Washed down last casing joint - MU hanger / landing jt. - Washed to bttm ~ 8377' (Proper pipe displacement was obtained f/ 5810' to 8377' (Observed no tight hole throughout casing run) 15:30 - 17:00 1.50 CASE P INT1 Circulate and reciprocate 7 5/8" casing - BPM 6- PP 590 psi 17:00 - 17:30 0.50 CASE P INT1 LD franks fillup tool - Install cement head - Connect lines 17:30 - 20:00 2.50 CASE P INT1 Break Circulation - Condition mud fl cement job - BPM 6- PP 470 psi - PUWT 257k - SOWT 105k (PJSM w/ SLB while circulating) 20:00 - 22:30 2.50 CEMT P INT1 Give to Schlumberger Pump 5 bbls water ahead Test lines to 3900 psi Pump 5 bbls water Pump 49.5 bbis Mud Push II ~ 11.0 ppg Pump 135.5 bb~s class "G" cement ~ 15.8 ppg / yield 1.17 / 653 sxs Rig displaced 381 bbls LSND bbls mud @ 9.5 ppg Reciprocated casing throughout Cementing and Dispiacement - PUWT 265k - SOWT 90k Bumped plug 3742 stks / 97% Eff. - CIP ~ 2200 hrs. Increased pressure 3500 psi f/ 30 min. Bled off pressure - Floats held - 100% returns throughout cement job. 22:30 - 00:00 1.50 CASE P INT1 Disconnect lines - LD cement head - Landing jt. - Casing tools - Clear rig floor 5/31/2007 00:00 - 01:30 1.50 CASE P INT1 LD cement head - C/O Grabbers on top drive - C/O Bales 01:30 - 03:30 2.00 CASE P INT1 Mobilize BHA to rig fioor - Back off lDS - Install Packoff - Set - RLDS - Test to 5000 psi f/ 10 min. (OK) 03:30 - 04:00 0.50 CASE P INT1 RU lines to 10 3/4" x 7 5/8" annulus - Pumped 30 bbis 9.2 ppg mud down annulus ~ 3 BPM - PP 710 psi injection rate - Blow down lines - RD same 04:00 - 05:30 1.50 CASE P INT1 PJSM - Change top rams to 2 7/8" x 5° VBRs - Rig up test equip. Test Top rams - 250 low / 4000 psi high f/ 5min each test - Record on chart 05:30 - 06:30 1.00 CASE P INT7 RD test equipment - Instail wear bushing 06:00 - 09:30 3.50 CASE P INT1 MU 6 3/4" Cleanout assy. - Bit - Scraper - Subs - Drill collars - Printed: 6/11/2007 11:17:54 AM i~ ~ i Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 I5/31/2007 I02.00 -~14 00 I 2.00 CASE P INT1 14:00 - 15:30 ( 1.50 ~ CASE ~ P ~ ~ INT1 15:30 - 19:00 ~ 3.50 ~ CASE ~ P ~ ~ INT1 19:00 - 19:30 ~ 0.50 ~ CASE ~ P I I ~NT1 Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 19:30 - 20:00 0.50 STW HIP P W EXIT ' 20:00-20:30 0.50 STWHIP P WEXIT ~ 20:30-21:00 0.50 STWHIP P WEXIT 21:00 - 00:00 3.00 BOPSU P W EXIT 6/1/2007 I 00:00 - 00:30 I 0.50 I BOPSUFi P I I W EXIT 00:30 - 01:00 0.50 BOPSU P WEXIT 01:00 - 02:00 1.00 STWHIP P WEXIT 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 04:30 2.00 STWHIP P WEXIT 04:30 - 05:00 0.50 STWHIP P WEXIT 05:00 - 11:30 6.50 STWHIP P WEXIT 11:30 - 12:30 I 1.001 STWHIPI P I I WEXIT 12:30 - 13:00 I 0.501 STWHIPIP I IwEXIT 13:00 - 14:00 ~ 1.00~ STWHIP~P ~ ~WEXIT 14:00 - 15:00 1.00 STWHIP P WEXIT 15:00 - 17:30 2.50 STWHIP P WEXIT 17:30 - 19:00 1.50 STWHIP P WEXIT 19:00 - 20:00 1.00 STWHIP P WEXIT 20:00 - 00:00 4.00 STWHIP P WEXIT 6/2/2007 100:00 - 05:00 I 5.001 STWHIPI P I I WEXIT HWDP - Jars - HWDP PU 4" driil pipe 1 x1 f/ pipe shed f/ 1209' to 3400' RIH w/ 4" drill pipe stands f/ 3400' to 8292' (Float collar ~ 8292') Circulate hole clean - BPM 8- PP 2160 psi - PUWT 170k - SOWT 85k Observe well - Pump dry job - POH w/ 4" driil pipe f/ 8292' to 1209' Stand back in Derrick - HWDP - Drill coliars (Diesel freeze protected 10 3/4" x 7 5/8" annulus - Little Red pumped 95 bbis - BPM 1- PP 900 psi) LD Bit - Scraper - Subs RU drain BOP stack - Pull wear bushing RU test equipment - Install test plug Test BOP's - Annular 250 low 3000 high - 5 mins each test - Top VBR's 2 7/8" X 5" - Lower VBRs 3 1/2" X 6" 250 low 3000 high - 5 mins each test - Tested with 4" test joint - Choke manifold - HCR Choke / Kill - Manual Choke / Kill - Upper / Lower IBOP - Floor safety valves - 250 low 3000 high 5 min each test - Cont. BOPE test - Performed Accumulator test - Test Blind rams 250 low 3000 high - All tests witnessed by WSL - Chuck Scheve with AOGCC waived witness of test RD test Equipment - Pull test plug Install wear bushing - Mobilize Baker tools to rig floor PJSM - Change out elevators and handling equip. MU Baker ZXP packer / liner hanger w/ Sperry LWD / GR Surface test LWD - GPM 100 - PP 495 psi RIH w/ 4" drill pipe f/ 106' - Fill pipe, break circulation and test LWD every 10 stds Screw in T.D - Obtain parameters - Circulate w/ 130 gpm 900 psi - Locate "RA" tag w/ LW D at 7867.14' (2.77' high) - RIH and spot liner top at 7961' - Drop 1 3/4' ball Pump ball down w/ 3 bpm, 890 psi - Slow pumps to 1 bpm, 220 psi at 600 strokes - Seat ball w/ 653 stks. Pressure up to 1900 psi to set liner hanger - Slack off and put 40k down weight to ensure hanger set - Continue to pressure up to 2250 (set ZXP packer) - 2890 psi (release HRD) - 3525 psi to neutralize Push Tooi - Continue to pressure up to 3900 psi. - Close annular -Test casing and Liner top packer to 2000 psi f/ 5 min - Record on chart - Good test - PU to expose Rotating "Dog" sub above liner top - Set Dogs down on liner top w/ 40k - Rotate w/ 15 RPM and set down 40k - Pull above liner top - Liner top at 7961' - WLEG at 8053' CBU w/ 6 bpm, 890 psi - Flow check - Dry job - Blow down T.D. POH w/ 4" drill pipe f/ 7961' to 84' LD - Baker running tool - XOs - LW D- Clear rig floor PJSM - Mobilize Baker whipstock assy. to rig fioor MU Whipstock assy. - Mil~ - String milis - HWDP - MWD - Initialize / upload MWD - Bumper sub - Drill collars - HWDP - Function test MWD - GPM 262 - PP 680 psi ' RIH w/ Baker whipstock assy. f/ 1190' to 6889' (fill pipe every I30 stds) Printed: 6/112007 11:17:54 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 6/2/2007 05:00 - 06:00 06:00 - 06:30 06:30 - 07:30 C~- aY~ ~ 07:30 - 12:00 12:00 - 14:00 14:30 - 15:30 15:30 - 17:30 17:30 - 19:30 19:30 - 20:30 20:30 - 22:00 22:00 - 00:00 6/3/2007 6/4/2007 - 01:30 01:30 - 04:30 04:30 - 05:30 MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 1.OOI STWHIP P 0.50 STWHIP P 1.00 STWHIP P 4.501 STWHIPI P 2.00! STWHIPI P 1.001 STWHIPIP 2.00 STWHIP P 2.00 STWHIP P 1.00 STWHIP P 1.50 STWHIP P 2.00 STWHIP P 1.50 STWHIP P 3.00 STWHIPIP 1.00 STWHIP P 05:30 - 22:00 16.50 DRILL P 22:00 - 00:00 2.00 DRILL P 00:00 - 00:30 I 0.50 DRILL P 00:30 - 12:00 11.50 DRILL P ~ r~ u Spud Date: 3/25/2003 Start: 5/15/2007 End: 6/10/2007 Rig Release: 6/10/2007 Rig Number: 14 WEXIT Slip and cut drilling line - Service top drive W EXIT Cont. RIH w/ whipstock assembly to 7850' W EXIT Screw in T.D. - break circulation w/ 6 bpm 1300 psi - Obtain parameters - Orient whipstock face to 20 deg. Left of highside - Make connection - Check orientation - Set down on liner top at 7957' - Shear Bottom Trip Anchor w/ 12k down wt. - PU to 152k (10k over) to ensure anchor set - Slack off and shear mills from slide w/ 35k down wt. - PU to neutral position WEXIT Obtain SPR - Begin milling window at 7923' w/ 80 RPM 1-2k WOB - 300 gpm 1800 psi - 10-12k torque ~ 100 rpm - Mill window and drill open hole - Top of window at 7923' - Bottom of window at 7935' - Drill total of 29' to TD at 7952' W EXIT Circ and pump sweeps around while working through window as per Baker rep. (assuring window was ciear of inetal debris / cont. while preparing mud pits for displacement) - PUWT 142k - SOWT 95k - ROWT 115k - GPM 340 - PP 2210 psi - RPM 100 - TQ 9k W EXIT PJSM - Displaced LSND as follows - 30 bbis Flo-vis spacer - 30 bbl water spacer - 30 bbis Flo-Pro spacer ~ 9.5 ppg, followed by New Flo-Pro NT ~ 92 ppg - GPM 345 - PP 1900 psi (No problems encountered w/ displacement) - Flow check weli (static) - Blow down T.D W EXIT POH f/ 7952' to 1190' WEXIT Stand back in derrick - HWDP - Drill collars - Download MWO WEXIT LD Baker Whipstock milling assy. (Upper string mill in Gauge) - Clear rig floor W EXIT Mobilize BHA to rig floor / Pull wear bushing - MU stack flusher - Flush stack - Function pipe rams - Instail wear bushing W EXIT MU 6 3/4" Directional BHA - Bit - Motor - Float sub - Stab - MWD / DM / RLL / Nukes / PWD / TM - Drill collars WEXIT Cont. MU BHA - Upload MWD - PJSM - Load Nuke tools - Drill coliars - Jars - HWDP - Surface test MWD tools - GPM 248 - PP 1180 psi W EXIT RIH w/ 4" drill pipe f/ 308' to 7820' (fill pipe every 25 stds) WEXIT Screw in T.D - Break circ - Obtain parameters - GPM 258 - PP 1900 psi - Correlate PWD and MWD ~ 60 / 80 RPM - TQ 11 to 12K - Orient BHA - Wash down f/ 7820' to top window @ 7923' - UPWT 145K - ROWT 120k - SOWT 100k - Shut down pump - Slide through window f/ 7923' to 7935' - Continue slide down to bttm @ 7952' -(No problems encountered going through , window) - PWD baseline @ 10.58 ppg ECD PROD1 Directional Drill 6 3/4" hole f/ 7952' to 8535' (Dropped out bttm of OA sand) PROD1 Directional Drill 6 3/4" hole f/ 8535' to 8732' - UPWT 120k - SOWT 88k - ROWT 105k - GPM 262 - PP 2280 psi on / 2090 psi off bttm - WOB 5k - TQ - 5k on / 2k off bttm - PWD ~ 10.88 ppg ECD PROD1 Directional Drill 6 3/4" hole f/ 8732' to 8760' (Drilled back up into OA sand ~ 8760') PROD1 Directional Drill 6 3/4" hole f/ 8760' to 9435' - PUWT 122k - SOWT 92k - ROWT 106k - GPM 270 - PP 2200 psi on / 2150 psi off bttm - RPM 80 - TQ 3k on / 4k off bttm - WOB 3-5k - PWD ~ 10.92 ppg ECD Printed: 6/17/2007 11:17:54 AM • ~ ,Legal Well Name: MPS-01 Common Well Name: MPS-01 Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 6/4/2007 12:00 - 17:30 5.50 DRILL I P 17:30 - 00:00 6.50 DRILL P 6/5/2007 00:00 - 02:30 2.50 DRILL P 02:30 - 11:30 9.00 DRILL P 11:30 - 14:00 2.50 DRILL P 14:00 - 16:00 2.00 DRILL P 16:00 - 17:00 1.00 DRILL P 17:00 - 20:00 3.00 DRILL P 20:00 - 22:30 2.50 DRILL P 22:30 - 00:00 6/6/2007 00:00 - 01:00 01:00 - 03:30 03:30 - 04:30 04:30 - 08:00 08:00 - 11:00 11:00 - 12:00 12:00 - 15:00 1.50 DRILL P 1.00 DRILL P 2.50 DRILL P 1.00 DRILL P 3.50 DRILL P 3.00 DRILL P 1.00 DRILL P 3.00 DRiLL P 15:00 - 17:30 17:30 - 00:00 I 6/7/2007 00:00 - 01:00 01:00 - 02:00 02:00 - 03:30 a3:30 - 04:00 Start: 5/15/2007 Rig Release: 6/10/2007 Rig Number: 14 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 2.50 DRILL I N RREP PROD1 6.50 DRILL P PROD1 PROD1 PROD1 PROD1 PROD1 1.00 DRILL P 1.00 DRILL P 1.50 DRILL P 0.50 DRILL P 04:00 - 04:30 ~ 0.50 ~ DRILL ~ P PROD1 Spud Date: 3/25/2003 End: 6/10/2007 Directionai Drill 6 3/4" hole f/ 9435' to 9730' (Drilied out top of OA sand ~ 9730') Directional Drill 6 3/4" hole f/ 9730 to 9960' - PUWT 125k - SOWT 86k - ROWT 105k - GPM 265 - PP 2270 psi on / 2190 psi off bttm - RPM 70 - TQ 4k on / 2k off bttm - PW D@ 10.89 ppg ECO Directional Drill 6 3/4" hole f/ 9960' to 10016' (Drilled down - back into OA sand ~ 10016") Directional Drill 6 3/4" hole f/ 10016' to 10,500' (6 3/4" TD) -- GPM 270 - PP 2310 psi Circulate bottoms up 3X w/ 270 gpm, 1990 psi - R&R DP w/ 80 RPM, 3k torque - Flow check Pump out f/ 10,500' to W hipstock at 7935' - Stop pumps and pull above whipstock CBU 1 X w/ 267 gpm, 1840 psi - Obtain parameters - No pump - PUW 130k, SOW 98k - Pumps on - PUW 122k, SOW 95k, ROTW 105 at 40 RPM - Tq 2k - Flow check - Pump dry job POH LD 93 jts 4" DP 1 x 1 to 4,967' RIH f/ 4,967' to top of whipstock C~ 7,923'. Orient motor and slide through window w/ pumps off. Cont. RIH to 10,500' (wash down last stand to bottom) Circulate 3x BU @ 270 gpm, 2150 psi. Reciprocating and rotating C~3 80 rpm. Cont. circulating 3x BU @ 270 gpm, 2150 psi Monitor well. Pump out of the hole f/ 10,500' to 7,900' Circulate hole clean above window. Monitor well. Pump dry job. Cont. POOH f/ 7,900' to BHA at 308' LD 2 jts. HWT, jars, fiex DC's - PJSM on sources - Remove sources - Download MWD - ~D MWD, motor & bit PJSM w/ Baker Rep. - RU power tongs, elevators, slips - Mobilize ECP equipment to rig floor MU ECP assembly: Float shoe - 2 Fioat collars - 2 jts 4-1/2" 12.6# L80 IBT tubing - XO -ECP -Pup jt & XO - 1 jt 4-1/2" 12.6# L80 IBT tubing - XO & pup jt - ECP - Running tool & XOs Repair iron roughneck RIH w/ ECP assembly f/ 202' to window ~ 7,923'. Fill pipe every 20 std. Break circulation at window. Check parameters: PUW 124 K, SOW 95 K. Cont. RIH f/ 7,923' to 8,649' Cont. RIH w/ ECP assembly f/8,649' to 10,068' Break down stand. PU 10' pup jt. RU Ts, valves, sensors and cement hose. Space out and position shoe at 10132', upper packer at 9,940'. Check PUK 184 K, SOW 90 K. Pump dart down and bumped in seat w/ 1100 psi. Shut down pump and waited for 1 hr to stabilize ECPs at bottom hole I temperature. Pressure up to 1,650 psi and set bottom ECP. Inflate bottom ECP w/ 0.25 bbl. Pressure up to 2,800 psi and set upper ECP. Inflate upper ECP w/ 0.25 bbl. Pressure up to 3,730 psi and reiease running tool. Check PUW 130 K RD Ts, valves, sensors and cement hose. Break and LD pup joint Printed: 6/77/Z007 71:17:54 AM • ~ Legal WeA Name: Common Well Name Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Start: 5/15/2007 Rig Release: 6/10/2007 Rig Number: 14 6/7/2007 04:30 - 08:00 3.50 DRILL P PROD1 08:00 - 08:30 0.50 DRILL P PROD1 I 6/8/2007 I 6/9/2007 08:30 - 10:30 ~ 2.00 ~ DRILL I P I I PROD1 10:30 - 12:00 I 1.501 DRILL I P I I PROD1 12:00 - 15:00 I 3.001 DRIIL I P I I PROD1 15:00 - 15:30 I 0.50I DRILL I P I I PROD1 15:30 - 17:00 1.50 DRILL P PROD1 17:00 - 20:30 3.50 DRILL P PROD1 20:30 - 23:00 2.50 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PRODi 00:00 - 01:00 I 1.001 CASE I P I I RUNPRD 01:00 - 03:30 I 2.501 CASE I P I I RUNPRD 03:30 - 04:00 0.50 CASE P RUNPRD 04:00 - 08:00 4.00 CASE P RUNPRD 08:00 - 10:30 I 2.501 CASE ( P I I RUNPRD 10:30 - 12:00 ~ 1.50 ~ CASE ~ P ~ ~ RUNPRD 12:00 - 15:00 I 3.001 CASE I P I I RUNPRD 15:00 - 17:00 2.00 CASE P RUNPRD 17:00 - 18:00 1.00 CASE P RUNPRD 18:00 - 21:00 3.00 CLEAN P CLEAN 21:00 - 23:00 2.00 CLEAN P CLEAN 23:00 - 00:00 1.00 CLEAN P CLEAN 00:00 - 05:30 5.50 CLEAN P CLEAN 05:30 - 06:00 0.50 RIGU P RUNCMP 06:00 - 09:00 3.00 RIGU P RUNCMP 09:00 - 11:00 I 2.00 RUNCMP Spud Date: 3/25/2003 End: 6/10/2007 POOH w/ running tool f/ 9,938' to running tooi RD running tool, XOs and 2-7/8" handling tools. Mobilize whipstock retrieving hook assembly PU and MU whipstock retrieving BHA: Hook - XO - 1 jt 4" HWDP - Bumper sub - Jar - Float sub - MWD - XO - 9 4-3/4" DCs Slip and cut drilling line. Service top drive. Grease blocks and crown. RIH w/ whipstock retrieving BHA f/ 385' to 7,900'. Fill pipe every 25 stands Orient hook and check parameters: PUW 128 K, SOW 98 K. Latch whipstock and pull free w/ 80 K overpull Monitor well. Circulate BU. POOH f/ 7,900' to BHA. LD 4-3/4" DCs, MWD, Jars and whipstock Clear floor. Pull pulser from MWD. PU 6 jts 4" HWDP and rack in derrick RU to run 4-1/2" production liner: tongs, elevators, slips. Mobilize centralizers to rig floor MU 4-1/2" production liner assembly as per design (combination of slotted liner, solid liner and swell packers). MU hook wall hanger. RD casing equipment. Clear floor and prepare to run DP RIH w/ 4-1/2" production liner on 4" DP f/ 2,009' to 6 3/4" window at 7923' - Obtain parameters - Bent joint through window w/ no issues - Continue run into open hole f/ 7923' to 9928' shoe depth (Hook Hanger 10' past bottom of window) - PUW 160k - SOW 100k PU to place Hook Hanger 30' above window - Turn pipe 1/4 tum and work through window - Repeat proccess until liner hooked in window - Set down 30k on hanger - PU 15' - Rehook hanger w/ 30k down - PU above window - Turn hanger 180 deg - Slack off 10' past window - PU above window - Re-orient and hook hanger in window w/ 35k down. Break connection - Drop 1 1/2" ball - Pump ball down w/ 3 bpm 500 psi - No indication of ball seating - Pump double DP volume - No Indication of seating - Drop 1 3/4" ball - Pump down - No seat - Work 3k ft/Ibs left hand torque down hole to shear off and release from liner - PU to ensure free - PUW 135k (25k less) - Top of liner at 7919' Break circulation - Pump dry job - POH LD 30 jts HWT - LD 81 jts 4" DP Cont. POOH w/ remaining 4" DP standing back in derrick. Break and LD running tool. Clear rig floor MU mule shoe. RIH w/ 4" DP f/ surface to 7,918' Displace well to 9.3 ppg brine as per Mud Engineer procedure. POOH and LD 4" DP f/ 7,918' to 6,500' POOH and LD 4" DP f/ 6,500' to surface. Pull wear ring Load pipe shed w/ 197 jts 4 1/2" IBT tubing - RU tubing tongs & equipment - RU I-Wire spool - Mob 4 1/2" jewelry to rig floor PJSM - MU WLEG w/ X-nipple - Packer - Jet Pump gauge - Sliding Sleeve and Discharge Pressure Gauge - Connect Printed: 6/11/2007 77:17:54AM . ~ Legal Well Name: MPS-01 ,Common Well Name: MPS-01 ~i Event Name: REENTER+COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Start: 5/15/2007 Rig Release: 6/10/2007 Rig Number: 14 6/9/2007 09:00 - 11:00 2.00 RUNCO RUNCMP 11:00 - 12:30 1.50 RUNCO RUNCMP 12:30 - 13:30 1.00 RUNCO RREP RUNCMP 13:30 - 22:30 9.00 RUNCO RUNCMP 22:30 - 00:00 I 1.50 I 6/10/2007 I 00:00 - 01:00 01:00 - 02:30 02:30 - 05:00 1.00 RUNCO 1.50 BOPSU P 2.50 WHSUR P 05:00 - 06:00 06:00 - 08:00 08:00 - 10:00 10:00 - 11:30 11:30 - 13:00 1.00 WHSUR P 2.00 WHSUR P 2.00 WHSUR P 1.50 WHSUR P 1.50 RIGD P RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP RUNCMP Spud Date: 3/25/2003 End: 6/10/2007 I-Wire and test same RIH w/ 4 1/2" 12.6# IBT tubing and I-wire to 1,000' Repair hose on pipe skate RIH w/ 4 1/2" 12.6# IBT tubing and I-wire f/ 1,000' to 7,510. Install X-nipple @ 2,713'. Use a total of 95 clamps on I-wire Install TWC in tubing hanger. MU hanger and landing jt. MU I-wire to penetrator. Land tubing hanger RILD. Test TWC from top to 2,500 psi. Blow down lines. Suck fluid out of BOP stack with rig vac. ND BOP. NU tree and adapter flange. Install termination sleeve on I-wire and perform conductivity test. Test tree and adapter flange to 4,000 psi. OK RU lubricator - Lines to annulus and tubing - Pull TWC Drop ball & rod - Allow to fall - Pressure up slowly on tubing - Observe shear at 3100 psi and 3700 psi - Continue to pressure up to 4200 psi - Hold pressure and record on chart for 30 min. - Good test - Bleed tubing back to 2500 psi - Pressure up on 7 5/8" x 4 1/2" annulus to 4000 psi - Hold pressure and chart for 30 min - Good test - Bleed tubing pressure - RP sheared w/ 2700 psi differentiat pressure - Bleed off all pressure RU Hot Oil truck to annulus - Pump 100 bbis diesel down annulus w/ 2.5 bpm, 1300 psi, taking returns through tubing - Hook annulus to tubing and allow to "U-Tube" for 1 hr RU lubricator - Install BPV - Test to 1000 psi from bottom - OK - RD lubricator and Hot Oil Secure tree. Prepare ce~lar and rig for release. Release rig @ 13:00 6-10-07 Printed: 6/11/2007 11:17:54 AM u` ~ ~ ~ `~ . ~ , : ~ ~ € ~`~. = _ ~, ° ' ' ~ ~ ~~~ ~ :_ A~fO BP E~PLOR ~ ~` ~~ ~ ~ ~ `' ~ ~ P , ~~ge 1~ o~ ~ ~ . ~.` ~ "~'~ ~ ~. 4 f x ~~ E ~ ~" R . ~ E ~ `~ E ~ € ~ 6~ t I. ~ ,.. «bpv^ ~ yt. ~_ " ~ I - :..~ " . . : ~ Y ( ~ ~ b ~-s t . h € .~~ ~ R 1 ., ~ §e a~ y~ Leak-~~f Test ~~ m~ry ~? ~~ ~ _ - ~~~, h1a q ~ ~ . ~ «~ ,v ~ ~ . ~ ~ A ~, ~._ ~ ~~x~. ~ ~ ~~ ~ ~ . ~~, Legal Name: MPS-01 Common Name: MPS-01 ` Test Date : , ~1'estType °,. :. ,. . Test'Depth.('fMD} ~ =; Test pe"pth ('T`1ID} ° AMW ~ 'Surface Pressure Le~k,Off Pres`~iire (BtiP~ . ,. EMW 3/29/2003 FIT 3,140.0 (ft) 2,381.0 (ft) 9.40 (ppg) 290 (psi) 1,453 (psi) 11.74 (ppg) 4/8/2003 FIT 8,170.0 (ft) 4,378.0 (ft) 9.50 (ppg) 345 (psi) 2,506 (psi) 11.02 (ppg) 10/16/2003 F~T 7,521.0 (ft) 4,225.0 (ft) 9.50 (ppgj 350 (psi) 2,435 (psi) 11.09 (ppg) 5/21/2007 LOT 3,150.0 (ft) 2,377.0 (ft) 8.80 (ppg) 250 (psi) 1,337 (psi) 10.82 (ppg) • 5/21/2009 LOT 3,140.0 (ft) 2,377.0 (ft) 8.80 (ppg) 400 (psi) 1,487 (psi) 12.04 (ppg) 6/8/2007 LOT (ft) (ft) (ppg) (psi) (psi) 12.04 (ppg) ~ rnmea: eii uzuui n n i:4a nm , . ~ • Halliburton Company Survey Report Cwnpanys ';BP Amaca Date. ~f28f2p(}7 Time: t6:4~:~v8 ~ P~ge: '' 7 I~ie1d~ ~~: Milne Ppint Sif~: M Pt S P~d Co-~rdinate(~FE} li~ierence: ' t~Vell: MP~-l31~, T~ue Np~'th Ye}~k3Ca1(T~?} Referenee: ': P11PS-01-ALt: 72~t~ ' Weri: MPS-(l1 '~ ~Ycllpathc 'MPS-tl1ALi . Section (VS)~Refgrence: W~II (U.441~S,Q.~tIE~~1$~US+~zi} . ~~ Sur~*eyGalcei~~EionMethae~: ' Atlini~tu~rGurv~tUre ' Db: C)r8cle Survey Mll ' Inc[ Azim ` T`VI) ': Sys 1'VI} ' ATlS EfkY ' Map1Y ' Map~ ~` :.; TUoI. ;. r ft deg dec~ ft i fk ' ~ ~k ', '~t fit 33J4 0.00 0.00 33.74 -38.30 0.00 0.00 6000044.65 566076.93 TIE LINE 119.54 0.63 171.85 119.54 47.50 -0.47 0.07 6000044.18 566077.00 KPR-SS 177.54 0.58 163.07 177.54 105.50 -1.06 020 6000043.59 566077.14 KPR-SS 244.54 0.81 118.40 244.53 172.49 -1.61 0.71 6000043.04 566077.66 KPR-SS 366.70 3.22 74.33 366.61 294.57 -1.10 4.78 6000043.60 566081.72 MWD+IFR+MS 456.21 4.59 68.02 455.91 383.87 0.92 10.52 6000045.67 566087.44 MWD+IFR+MS 546.30 6.40 56.70 545.59 473.55 5.03 18.06 6000049.84 566094.94 MWD+IFR+MS 637.07 8.69 45.27 635.57 563.53 12.63 27.16 6000057.52 566103.97 MWD+IFR+MS 727.02 11.68 40.49 724.09 652.05 24.34 37.90 6000069.33 566114.61 MWD+IFR+MS 822.40 15.71 42.41 816.74 744.70 41.23 52.89 6000086.34 566129.44 MWD+IFR+MS 914.91 17.35 48.25 905.43 833.39 59.66 71.63 6000104.94 566148.02 MWD+IFR+MS 1012.44 21.85 45.66 99729 92525 82.04 95.47 6000127.53 566171.66 MWD+IFR+MS 1104.89 25.47 46.90 1081.95 1009.91 107.66 122.30 6000153.37 566198.26 MWD+IFR+MS 1197.95 28.55 46.18 1164.85 1092.81 136.73 152.96 6000182.72 566228.66 MWD+IFR+MS 1291.66 30.90 48.87 1246.23 1174.19 168.07 18725 6000214.36 566262.67 MWD+IFR+MS 1385.28 32.64 45.85 1325.83 1253.79 201.47 223.47 6000248.07 566298.59 MWD+IFR+MS 1480.18 34.93 44.31 1404.70 1332.66 238.75 260.82 6000285.67 566335.60 MWD+IFR+MS 1576.01 38.04 44.83 1481.74 1409.70 279.33 300.81 6000326.60 566375.23 MWD+IFR+MS 1669.75 37.70 46.63 1555.74 1483.70 319.50 342.01 6000367.13 566416.07 MWD+IFR+MS 1762.95 40.81 48.42 1627.90 1555.86 359.29 385.52 6000407.30 566459.22 MWD+IFR+MS 1858.36 41.52 52.44 1699.74 1627.70 399.26 433.92 6000447.70 566507.26 MWD+IFR+MS 1950.59 41.76 53.81 1768.67 1696.63 436.03 482.94 6000484.90 566555.95 MWD+IFR+MS 2042.93 43.75 54.46 1836.46 1764.42 472.75 533.74 6000522.06 566606.42 MWD+IFR+MS 2139.17 48.52 48.86 1903.16 1831.12 515.86 588.02 6000565.64 566660.31 MWD+IFR+MS 2230.69 52.41 52.57 1961.42 1889.38 560.48 642.67 6000610.74 566714.55 MWD+IFR+MS 2324.87 56.86 51.44 2015.92 1943.88 607.76 703.16 6000658.55 566774.62 MWD+IFR+MS 2417.42 59.35 52.38 2064.82 1992.78 656.22 765.00 6000707.55 566836.03 MWD+IFR+MS Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: W ell Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2006 Well: MPS-01 Slot Name: Well Position: +N/-S 69.04 ft Northing: 6000044.65 ft Latitude: 70 24 38.008 N +FJ-W -267.49 ft Easteng : 566076.93 ft Longitude: 149 27 43.011 W Position Uncertainty: 0.00 ft Wellpath: MPS-01AL1 DrilledFrom: MPS-01A 500292314162 Tie-on Depth: 7860.56 ft Current Datum: MPS-01 ALi : Height 72.04 ft Above System Datum: Mean Sea Level Magnetic Data: 5/25/2006 Declination: 24A2 deg Field Strength: 57616 nT Mag Dip Angle: 80.90 deg Vertical Section: Depth From (TVD) +N/-S +FJ-W Direction ft ft ft deg 33 J4 0.00 0.00 48.05 Survey Program for De6nitive Wellpath Date: 6/28/2007 Validated: No Version: 2 Actual From To Survey Toolcode Tool Name ft ft 119.54 244.54 MPS-01 Gyro (119.54-244.54) (0 KPR-SS SDC Keeper single shots 366.70 3075.38 MPS-01 PBi IIFR+MS+Sag (366.70- MWD+IFR+MS MWD + IFR + Multi Station 3145.00 7860.56 MPS-01A IIFR+MS+SAG (3145.00-8 MWD+IFR+MS MWD + IFR + Multi Station 7923.00 10451.25 MPS-01AL1 IIFR+MS+SAG (7923.00 MWD+IFR+MS MWD + IFR + Multi Station . , ~ ~ ~ Halliburton Company Survey Report Campany: '', BP AmoCO Date: fif28124Q7 Time: 16:U6:58 ' P~gez '' ti Field; Milne Point Go-ordinate(NEj Referenees ' WeI1: MPSrO~, True Np~kh Site: 'M PtS f?~d Vertica[°(TVD?keference: [viPS-Q1!AL1:72.(l Well:" iMPS-Oi Sestion (V5} Itefere~aee: '. W~t( {p.{~ON,d.C3~E;48.45Azi} Wellpath: ~'MPS-b1A L1 Survey Caiculation Methad: ' M'tnimUrrt ~Ur+lltur~ Db: flracke Survey : MA i IaeC Azim 1'~TD Sys TVI~ ' N/5 ECW i Ntapl~ ' MapE Tool ft tleg ;deg N' ft ft ft ft ' ft 2511.50 62.44 50.10 2110.58 2038.54 707.69 829.07 6000759.58 566899.63 MWD+IFR+MS 2605.58 63.87 53.43 2153.07 2081.03 759.62 895.00 6000812.08 566965.09 MWD+IFR+MS 2699.63 65.82 53.39 2193.05 2121.01 810.36 963.35 6000863.42 567032.98 MWD+IFR+MS 2791.87 67.89 54.84 2229.30 2157.26 860.06 1032.07 6000913.73 567101.25 MWD+IFR+MS 2885.60 67.04 47.00 2265.27 2193.23 914.57 1099.21 6000968.82 567167.91 MWD+IFR+MS 2980.64 65.09 45.85 2303.83 2231.79 974.44 1162.15 6001029.24 567230.30 MWD+IFR+MS 3075.38 65.18 52.24 2343.70 2271.66 1030.74 1227.02 6001086.11 567294.67 MWD+IFR+MS 3145.00 64.13 51.28 2373.50 2301.46 1069.68 1276.44 6001125.48 567343.73 MWDtIFR+MS 3206.12 63.33 50.41 2400.55 2328.51 1104.29 1318.94 6001160.46 567385.92 MWD+IFR+MS 3299.55 63.23 56.48 2442.59 2370.55 1153.96 1385.93 6001210.72 567452.47 MWD+IFR+MS 3394.26 65.70 53.68 2483.42 2411.38 1202.89 1455.98 6001260.26 567522.07 MWD+IFR+MS 3490.57 67.78 57.87 2521.47 2449.43 1252.61 1529.12 6001310.62 567594.77 MWD+IFR+MS 3585.64 70.23 57.50 2555.53 2483.49 1300.06 1604.13 6001358.73 567669.34 MWD+IFR+MS 3681.31 69.85 57.21 2588.19 2516.15 1348.57 1679.85 6001407.90 567744.62 MWD+IFR+MS 3775.45 69.91 57.62 2620.57 2548.53 1396.17 1754.33 6001456.16 567818.67 MWD+IFR+MS 3871.37 70.50 58.29 2653.05 2581.01 1444.06 1830.83 6001504.71 567894.74 MWD+IFR+MS 3966.83 68.83 58.52 2686.22 2614.18 1490.95 1907.07 6001552.27 567970.55 MWD+IFR+MS 4062.42 69.03 58.54 2720.59 2648.55 1537.52 1983.15 6001599.51 568046.21 MWD+IFR+MS 4156.49 68.59 58.62 2754.59 2682.55 1583.24 2057.99 6001645.89 568120.64 MWD+IFR+MS 4250.35 68.23 59.16 2789.13 2717.09 1628.34 2132.72 6001691.63 568194.96 MWD+IFR+MS 4345.98 68.75 58.55 2824.19 2752.15 1674.35 2208.86 6001738.32 568270.68 MWD+IFR+MS 4441.64 68.44 58.34 2859.11 2787.07 1720.96 2284.75 6001785.59 568346.15 MWD+IFR+MS 4539.07 68.64 58.28 2894.75 2822.71 1768.59 2361.91 6001833.90 568422.88 MWD+IFR+MS 4634.17 68.31 58.61 2929.64 2857.60 1814.89 2437.30 6001880.86 568497.84 MWD+IFR+MS 4727.96 66.87 58.63 2965.40 2893.36 1860.04 2511.32 6001926.66 568571.46 MWD+IFR+MS 4823.35 67.02 57.99 3002.75 2930.71 1906.15 2586.00 6001973.42 568645.72 MWD+IFR+MS 4915.54 64.84 60.43 3040.36 2968.32 1949.24 2658.29 6002017.15 568717.62 MWD+IFR+MS 5009.39 65.67 60.13 3079.64 3007.60 1991.50 2732.31 6002060.05 568791.26 MWD+IFR+MS 5105.79 65.67 59.94 3119.36 3047.32 2035.37 2808.41 6002104.59 568866.96 MWD+IFR+MS 5201.99 64.82 60.56 3159.64 3087.60 2078.72 2884.25 6002148.61 568942.41 MWD+IFR+MS 5297.52 64.41 59.99 3200.59 3128.55 2121.51 2959.20 6002192.06 569016.97 MWD+IFR+MS 5392.24 66.65 59.56 3239.83 3167.79 2164.91 3033.69 6002236.11 569091.06 MWD+IFR+MS 5488.44 67.12 58.71 3277.59 3205.55 2210.30 3109.63 6002282.16 569166.59 MWD+IFR+MS 5583.32 67.30 59.65 3314.34 3242.30 2255.12 3184.75 6002327.64 569241.31 MWD+IFR+MS 5677.46 65.88 60.00 3351.75 3279.71 2298.54 3259.43 6002371.72 569315.59 MWD+IFR+MS 5771.22 66.97 59.21 3389.25 3317.21 2342.02 3333.55 6002415.85 569389.32 MWD+IFR+MS 5866.39 64.42 61.45 3428.42 3356.38 2384.96 3408.90 6002459.45 569464.27 MWD+IFR+MS 5958.77 64.77 60.24 3468.05 3396.01 2425.61 3481.77 6002500.74 569536.77 MWD+IFR+MS 6056.38 64.96 59.68 3509.51 3437.47 2469.85 3558.27 6002545.65 569612.87 MWD+IFR+MS 6151.37 64.64 62.27 3549.96 3477.92 2511.55 3633.41 6002588.01 569687.63 MWD+IFR+MS 6245.10 64.95 63.63 3589.88 3517.84 2550.12 3708.94 6002627.23 569762.81 MWD+IFR+MS 6339.28 64.67 65.38 3629.97 3557.93 2586.80 3785.86 6002664.59 569839.40 MWD+IFR+MS 6436.93 66.59 65.51 367026 3598.22 2623.76 3866.76 6002702.26 569919.96 MWD+IFR+MS 6532.99 65.74 62.30 3709.08 3637.04 2662.39 3945.66 6002741.59 569998.51 MWD+IFR+MS 6628.56 65.45 61.75 3748.57 3676.53 2703.22 4022.52 6002783.09 570075.00 MWD+IFR+MS 6722.41 66.77 62.17 3786.58 3714.54 2743.55 4098.26 6002824.09 570150.36 MWD+IFR+MS 6817.01 63.98 61.32 3825.99 3753.95 2784.25 4174.00 6002865.46 570225.74 MWD+IFR+MS 6912.31 64.56 60.30 3867.37 3795.33 2826.13 4248.95 6002907.98 570300.30 MWD+IFR+MS 7008.50 65.50 59.76 3907.97 3835.93 2869.69 4324.48 6002952.21 570375.45 MWD+IFR+MS 7103.52 66.00 60.14 3947.00 3874.96 2913.07 4399.47 6002996.25 570450.04 MWD+IFR+MS 7198.12 65.97 60.57 3985.50 3913.46 2955.81 4474.57 6003039.65 570524.76 MWD+IFR+MS 7292.69 65.03 60.96 4024.72 3952.68 2997.84 4549.67 6003082.33 570599.47 MWD+IFR+MS 7387.00 62.82 61.30 4066.17 3994.13 3038.74 4623.84 6003123.89 570673.27 MWD+IFR+MS ~ . Halliburton Company Survey Report Company: ',BP AmoCC~ ~'ield: 'tVtilne POint Dake: 6128/2007 Timer t 6:06:58 Ca-ordinate~NE} RePerence: '. V1telL MP~-0~, Tt'Ue Page: '' 3 Nc)rttt Si~c: ~~M Pt ~ R~tl Ver~ieaC (TV~}) Ref~renee. ~~'~. ~IPS-OtRLi : 72:p ~ WeIl: ;MP3-01 ` SeGtion~'~}~teferene~: ~~~ W~~1 ~fl.04N,00QE,48A5Azi} ' Wetlpath. 'MFS-Q1A l,1 Survey Cale~lakidn-Method; Minimum Curuature ' Dh: ~rael~ Survey ' MI3 ; TncI Azim TVD ' Sys'I'~B ` N/S FIW MapN ' 14I~p~ Too! ' ft det~ !deg ft ' ft ' fit ft: ft ' ft 7481.72 62.30 60.89 4109.82 4037.78 3079.37 4697.43 6003165.16 570746.49 MWD+IFR+MS 7578.63 63.76 60.39 4153.77 4081.73 3121.72 4772.71 6003208.17 570821.38 MWD+IFR+MS 7673.26 64.95 60.73 4194.72 4122.68 3163.65 4847.00 6003250.75 570895.29 MWD+IFR+MS 7767.44 65.56 60.47 4234.14 4162.10 3205.63 4921.52 6003293.39 570969.43 MWD+IFR+MS 7860.56 67.21 60.37 4271.44 4199.40 3247.75 4995.71 6003336.16 571043.24 MWD+IFR+MS 7923.00 66.68 59.90 4295.90 4223.86 3276.36 5045.54 6003365.21 571092.81 MWD+IFR+MS 8020.34 79.18 58.85 4324.41 4252.37 3323.69 5125.44 6003413.24 571172.28 MWD+IFR+MS 8085.80 85.54 58.20 4333.11 4261.07 3357.55 5180.74 6003447.58 571227.27 MWD+IFR+MS 8136.31 91.36 57.70 4334.48 4262.44 3384.33 5223.52 6003474.74 571269.81 MWD+IFR+MS 8213.61 88.73 53.90 4334.42 4262.38 3427.77 5287.43 6003518.74 571333.33 MWD+IFR+MS 8242.94 87.44 51.84 4335.40 4263.36 3445.46 5310.80 6003536.63 571356.54 MWD+IFR+MS 8341.18 85.38 46.38 4341.55 4269.51 3509.62 5384.89 6003601.43 571430.05 MWD+IFR+MS 8434.22 87.36 43.04 4347.45 4275.41 3575.59 5450.20 6003667.98 571494.77 MWD+IFR+MS 8529.66 83.22 42.19 4355.28 4283.24 3645.58 5514.59 6003738.52 571558.53 MWD+IFR+MS 8625.13 84.40 39.58 4365.58 4293.54 3717.33 5576.71 6003810.81 571620.00 MWD+IFR+MS 8712.02 93.73 36.21 4366.99 4294.95 3785.80 5630.00 6003879.75 571672.68 MWD+IFR+MS 8816.91 92.36 36.09 4361.42 4289.38 3870.38 5691.79 6003964.86 571733.71 MWD+IFR+MS 8908.40 92.06 35.58 4357.89 4285.85 3944.49 5745.31 6004039.44 571786.57 MWD+IFR+MS 9005.02 91.02 32.78 4355.30 4283.26 4024.39 5799.56 6004119.80 571840.11 MWD+IFR+MS 9095.97 88.04 25.84 4356.04 4284.00 4103.63 5844.05 6004199.43 571883.90 MWD+IFR+MS 9188.50 91.01 22.12 4356.81 4284.77 4188.15 5881.65 6004284.27 571920.74 MWD+IFR+MS 9284.48 89.97 18.21 4355.99 4283.95 4278.22 5914.73 6004374.62 571953.01 MWD+IFR+MS 9386.07 86.56 14.49 4359.07 4287.03 4375.63 5943.30 6004472.27 571980.73 MWD+IFR+MS 9480.33 87.24 13.37 4364.16 4292.12 4466.98 5965.96 6004563.81 572002.57 MWD+IFR+MS 9572.91 88.30 13.59 4367.77 4295.73 4556.94 5987.53 6004653.95 572023.34 MWD+IFR+MS 9668.87 90.59 10.21 4368.70 4296.66 4650.81 6007.31 6004747.98 57204229 MWD+~FR+MS 9761.85 91.20 6.15 4367.24 4295.20 4742.82 6020.53 6004840.09 572054.70 MWD+IFR+MS 9854.95 88.29 5.19 4367.66 4295.62 4835.45 6029.73 6004932.79 572063.07 MWD+IFR+MS 9941.91 85.76 5.90 4372.17 4300.13 4921.88 6038.12 6005019.28 572070.70 MWD+IFR+MS 10043.63 86.57 5.51 4378.97 4306.93 5022.87 6048.21 6005120.35 572079.89 MWD+IFR+MS 1013823 86.31 5.71 4384.85 4312.81 5116.83 6057.44 6005214.38 572088.29 MWD+IFR+MS 10227.70 87.11 5.79 4389.98 4317.94 5205.70 6066.39 6005303.32 572096.45 MWD+IFR+MS 10324.80 87.12 5.98 4394.87 4322.83 5302.17 6076.33 6005399.86 572105.54 MWD+IFR+MS 10417.31 89.10 5.24 4397.92 4325.88 5394.18 6085.37 6005491.94 572113.76 MWD+~FR+MS 10451.25 89.66 5.18 4398.29 4326.25 5427.98 6088.45 6005525.76 572116.55 MWD+IFR+MS 10500.00 89.66 5.18 4398.58 4326.54 5476.53 6092.85 6005574.35 572120.52 PROJECTED to TD Re: MPS-OlA Completion • ~ Subject: Re: MPS-OlA Completion From: T'homas Maunder <tom maunder@admin.sta.te.ak.us> Date: Wed, 06 Jun 2007 14:19:48 -0800 To: "Tohnson, David A. (Fairweather)" <David.A.Johnson@bp.com> Thanks for the information Dave. I will place a copy of this note in the file. Nothing further is needed. Only request is please put the permit number in the title ~(~~ -~~ ~ on messages. It helps filing. Call or message with any questions. Tom Maunder, PE ~,~ ~ - ~ ~ ~~..._.~~, AOGCC Johnson, David A. (Fairweather) wrote, On 6/6/2007 2:06 PM: Tom, MPS-01A drilled the OA lateral to 10500' MD (originally planned for 13455' MD). The last +/- 500' of the ', lateral is wet. We now paln to isolate the water with a ECP packer assembly and complete the well with a ' slotted liner. Swell packers witl be run on the bottom of the liner to aid in further isolation. The brief procedure is as follows. 1) Run 2 Baker ECP's (space out ECP's with one blank joint in befinreen). It will be necessary to fill pipe while running in hole. ~ 4-1/2" float shoe and finro float collars baker-locked together o Two joints of 41/2" blank pipe. o Baker ECP Packer c One joint 4-1/2" blank pipe ; o Baker ECP Packer (set at 9950') ' o Baker running tool. Run two Volant centralizers with stop ring on each blank joint. ; 2) Position top ECP at 9940' MD and set packers. Shear off of tool. Circulate well clean. 3) Pull and retrieve whipstock 4) Run 41/2" slotted liner as follows and land hanger in window. 0 41/2" bull plug - plugged ~ One joint 4-1/2" blank pipe (bent) o One joint 4-1/2" blank pipe. o One Baker swell packer (water sensitive) - place at +/- 9800' o One joint 4-1/2" blank pipe. ~ One Baker swell packer (water sensitive) 0 41/2" blank pipe to +/-9650' 0 41/2~ slotted liner from 9650' to 8850' 0 4-1/2" blank pipe to +/-8750' 1 of 2 6/18/2007 9:31 AM I Re: MPS-OlA Completian C~ • 0 2 Swell packers (oil sensitive - already on location) with two joints in befinreen to be set in the interval 8650' to 8750' ~ 4-1/2" blank pipe to +/-8500' 0 41/2" slotted liner from 8500' to 8000' ~ 4-112" blank pipe to window' o Baker Hookwall hanger ' Run two Volant centralizers with stop ring per joint. 5) Complete well with jet pump assembly per original program. ' Dave ' «Johnson, David A. (Fairweather) (iohn23(c~BP.com).vcf» I 2 of 2 6/18/2007 931 AM ~ ~.4RA~1 PAZ~M, GovERR9oR Dan Kara Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. 7th AVENUE, SUITE 100 ANCHORAGE,ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPS-OlALl BP Exploration (Alaska) Inc. Permit No: 207-037 Surface Location: 3375' FSL, 4714' FEL, SEC. 07, T12N, R1 lE, UM Bottomhole Location: 975' FSL, 159' FWL, SEC. 36, T13N, RlOE, UM Dear Mr. Kara: Enclosed is the approved application for permit to redrill the above referenced development well. The permit is for a new wellbore segment of e~sting well MPS-OlA, Permit No. 207- 034, API No. 50-029-23141-01. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically at~tho,riz,es a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of th~ mission to witness any required test, contact the Commission's petroleum field i pec or at (907) 659-3607 (pager). DATED this ~day of March, 2007 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~JN PERMIT TO DRILL 20 AAC 25.005 ~ ~~~~i~~~ 3I,5' Ma~ a s zoor liEfloL~ f1•t o n__ ,. 1 a. Type of work ~ ^ Drill ~ Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ,~ Development Oil ^ Single Zone 1 c. Specify if well is propo e ' s ^ Coalbed Methane ~~~tes ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: MPS-01AL1 ' 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 13455 ~ ND 4413 ~ 12. Field / Pool(s): Milne Point Unit I Schrader Bluff 4a. Location of Well (Govemmental Section): Surface: , _ 07 T12N 3375' FSL 4714' FEL SEC R11E UM 7. Property Designation: ~ .~pt.3pk~Ql$ DL 025518 ~,gL`31 ' , , , . , , Top of Productive Horizon: 1418' FSL, 4822' FEL, SEC. 05, T12N, R11 E, UM 8. Land Use Permit: ~, ~,~.d1 13. Approximate Spud Date: April 15, 2007 Total Depth: 975' FSL, 159' FEL, SEC. 36, T13N, R10E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 3800' 4b. Location of Well (State Base Plane Coordinates): Surface: x-566077 ' y-6000045- Zone-ASP4 10. KB Elevation KBE = (Height above GL): 72.5~ feet 15. Distance to Nearest Well Within Pool: 150' 16. Deviated Wells: Kickoff Depth: 8063 ' feet Maximum Hole An le: 91.2 ' de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1935 ' Surface: 1498 • 1 ~ - Hole Casin Wei ht Grade Cou lin Len th MD TVD MD ND includin sta e data 6-3/4" 4-1/2" 12.6# L-8 iBTS~onaa 5392' 8063 4 1 134 5' 4413' nc mented I Lin r Tg, PRESE NT WELL CfJNDI'f10N S UkAMARY (To' be c~mpleted for RedriU and Re-e ntry Up~rations) '; Total Depth MD (ft): 8448 Total Depth TVD (ft): Plugs (measured): 4509 None Effective Depth MD (ft): Effective Depth TVD (ft): 8448 4509 Junk (measured): None asing = en ize ement o ume Conductor / Structural 7g' 260 sx Arcti A r x. 112' 112' Surface 3105' 10-3/4" 946 sx PF 'L' 7 sx Cla s'G' 3140' 2375' Intermediate 8448' 7-5/8" 703 sx CI ss'G' 844 ' 4 9' P ion Liner Perforation Depth MD (ft): None Perforation Depth ND (ft): None 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Adrienne Mcvey, 564-a~ 8a Printed Name Dan Kara Title Senior Drilling Engineer Prepared By Name/Number: Si nature ~ Phone 564-5667 Date'~ t>fl o Sondra Stewman, 56a-a750 Commission Use Onl Permit To Drilt Num er: 2~?""a37 API Number: 50-029-23147-62-00 Permit Ap roval t: • See cover letter for oth rr irements Conditions of Approval: ~ If box is ehecked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes LJNo Mud Log Req'd: ^~-, /Yes L7 No HZS Measures: ^ Yes Q~No ireoti nal Survey Req'd: lJ Yes ^ No Other: `3pC~?~~ \~A`~-'~S~t- APPROVED BY THE COMMISSION Date '`~,~,~~Q , COMMISSIONER Form 10-401 Revised 12/2005 Submit In Duplicate .~A J.~~.o~ ~ ~~7 OR ~ ~ Milne Point Well MPS-01A L 1 Schrader OA Horizontal Producer Drilling and Completion Plan Summary T pe of WeiL• Schrader Bluff OA Horizontal Producer Sul'face Location: 3,375' FSL and 4,714' FEL ~ (AS BUllt) Section 7, T12N, R11 E UM E = 566,077' N = 6,000,045' 9-7/8" Hole: Top OA 1,418 FSL and 4,822' FEL Section 5, T12N, R11 E UM E= 571,205' N= 6,003,415' Z= 4,351' TVD 9-7/8" Hole Top OB 1,497' FSL and 4,683' FEL Section 5, T12N, R11 E UM E= 571,343' N= 6,003,495' Z= 4,422' TVD 9-7/8" Hole TD 1,595' FSL and 4,510` FEL Section 5, T12N, R11 E UM E= 571,515' N= 6,003,594' Z= 4,506' TVD 6-3/4" OA Lateral TD 975.2' FSL and 159.4' FEL ,. Section 36, T73N, R10E UM E- 571,062' N= 6,008,250' Z- 4,413' TVD Distance to Pro ert line 3800' Distance to nearest well 150' from MPS-03 Estimated Start Date: 15 A ril, 2007 TMD: 13,455 TVD: 4,413 Max Inc: 91.2° KOP: 8063' KBE: 72.5' Well Desi n: Conventional OA Horizontal Producer Ob'ective: Schrader Bluff OA Maximum antici ated BHP: 1935 psi at 4,372' TVDss (OB Sand) Maximum surface ressure: 1498 psi (Based on a full column of gas at 0.1 psi/ft) Planned BOP Test ressure: 3000 psi ~ ~ Mud Program 9-7/8" Intermediate Hole (3,250' - 8,448'): LSND MD ` Densi PU YP : H API Filtrate ' MBT 3270'-8256' 8.8-9.5 8-20 18-26 9.0-10A 6-8 <25 8256' - 8446' 9.5 14 - 20 18 - 26 9.0 - 10.0 6- 8 < 25 6-3/4" Production Hole (8,063' -13,455'): LSND 'MQ Densit ' PV YP '' H APt Filtrate MBT 8056'-13453' 9.0-9.3 10-16 22-28 9.0-9.5 6-8 <6 Casing/Tubing Program Hole Size Casing Size Wt/Ft Grade Conn Length Top MD Top TVD Bottom MD Bottom TVD 42 20* 92 H-40 Weld 112 0 0 112 112 13.5 10.75* 45.5 L-80 BTC 3140 0 0 3140 2375 9.875 7.625 29.7 L-80 TC I I 7000 0 0 7000 3913 9.875 7.625 29.7 L-80 BTC-M 1448 7000 3913 8448 4509 6.75 4.5 12.6 L-80 IBT Slotted 5392 8063 4351 13455 4413 - 4.5 12.6 L-80 IBT-M 7960 0 0 7960 4309 * P re-set Cement Program Casin Size 7-5/8", 29.7#, L-80, TCII/BTC-M Production Casin Basis Tail cement = 500' MD above the TUZC. 40% excess over au e hole. Total Cement Volume: 146.0 bbl ~/ash 5 bbl water 10 bbl CW 100 S acer 50 bbl of MudPush Tail 146.0 bbl, 703 sx `G' mixed at 15.8 Ib/ al & 1.17 ft /sx Tem BHST =80°F from SOR 2 ~ Evaluation Program ~ 9-7/8" Section Open Hole: . DIR/GR/RES • NEU/DEN • IFR/CASANDRA • InSite • MDT • IsoTubes Cased Hole: . GR/USIT/CCL PDC mode 6-3/4" Section Open Hole: . DIR/GR/RES • PWD ~ • NEU/DEN • I FR/CASAN DRA • InSite Formation Markers Formation To s TMD ft TVDss ft BHP si Surface Pressure Gradient si/ft EMW Ib/ al BPRF 1750 758 583 0.433 8.33 TUZC 6484 3642 1578 1214 0.433 8.33 U nu-MA 7062 3876 1679 1291 0.433 8.33 U nu-MB1 7114 3897 1688 1298 0.433 8.33 U nu-MB2 7242 3949 1711 1316 0.433 8.33 U nu-MC 7549 4073 1764 1357 0.433 8.33 SBF2-NA 7670 4122 1785 1373 0.433 8.33 SBF1-NB 7811 4179 1608 1190 0.385 7.40 SBE4-NC 7860 4199 1819 1399 0.433 8.33 SBE2-NE 7897 4214 1825 1404 0.433 8.33 SBE1-NF 7991 4252 1842 1417 0.433 8.33 TSBD-To OA 8055 4278 1893 1465 0.442 8.51 TSBC-Base OA 8166 4323 1913 1481 0.443 8.51 TSBB-To OB 8230 4349 1925 1490 0.443 8.51 SBAS - Base OB 8288 4372 1935 1498 0.443 8.51 Recommended Bit Program `Hole Size Depth (TMD) ` Footage Bi# Type TF~ GPAA 9-7/8 3,270' - 8,446' 5,176' Hughes Christensen MXL-1 X .50-.70 500-600 6-3/4 8,056' - 13,453' 5,397' Hycalog DTX613M .40-.50 200-300 ~ ~ 3.~3, 07 ~ Well Control Intermediate Hole • Maximum anticipated BHP: • Maximum surface pressure • Planned BOP test pressure Integrity tests: Kick tolerance: • Planned completion fluid ~ 1935 psi at 4,372' TVDss (OB Sand) 1498'psi (Based on a full column of gas at 0.1 psi/ft) 3,000 psi FIT to 12.5 Ib/gal 20' below the 10-3/4" shoe. 90 bbls with 9.3 Ib/gal mud at the 10-3/4" shoe. Kill weight brine (9.3 ppg) with diesel cap. Drilling Hazards & Contingencies Lost Circulation • Lost circulation is not reported as a major problem for S-Pad. ' Expected Pressures Standard pressure gradient (8.33 ppg) is expected through the Ugnu and the Schrader N sands. The OA and OB sands are expected to have a pressure gradient of 8.5 ppg; however, the most recent SBHP survey for the MPS-07i long string (OB sand) was 2,417 psi (11.6 ppg EMW). It is highly unlikely that this pressure will be encountered, as S-07i is thought to be injecting into an isolated section of the OB sand, and the S-01 A wellbore is planned to penetrate the OB ~2100' away from S-07, but the possibility should be noted. Pad Data Sheet • Please Read the S-Pad Data Sheet thoroughly. Hydrocarbons Hydrocarbons are possible in the Ugnu & Schrader Bluff intervals. Faults • There are no predicted fault crossings for this well. Hydrogen Sulfide • MPS Pad is not designated as an H2 S Pad. H2S detected from S-Pad wells: Well Name H2S Level Date of Readinq #1 Closest SHL Well H2S Level MPS-03 < 2 ppm May 2005 #2 Closest SHL Well H2S Level MPS-05 < 2 ppm May 2005 #3 Closest SHL Well H2S Level MPS-17 < 2 ppm May 2005 Max. Recorded H2S on Pad/Facility MPS-17 < 2 ppm May 2005 ~ Anti-collision Issues • MPS-01 A passes the Major Risk Criteria except for the MPS-01 original wellbore. This wellbore is abandoned. Distance to Nearest Property • MPS-01 A is planned to be 3800' from the nearest Milne Point property line. Distance to Nearest Well Within Pool • MPS-01A is 1300' from the nearest sand penetration (MPE-29). 4 ~ ~ ~ Procedure Summary Pre-Rig Operations 1. Perform outer annulus injectivity test to 2500 psi. 2. Perform PPPOT-IC to 3000 psi. 3. Install BPV. Drilling ~4. MIRU. NU BOPE and test. ~~~~ 6. RIH a d s t17-5/8" brid e36u~'aM3D319' MD. ~2'~~~ 3~ 9 p 9 3~ 7. Make mechanical cut at 3237' (~100' below 10-3/4" shoe) in 7-5/8" casing. 8. Circulate out OA freeze protect. Pull and lay down 7-5/8" casing. 9. RIH w/ tubing stinger on DP and lay a 17.0 ppg cement plug from 7-5/8" stub to 200' inside 10-3/4" casin shoe estimated at 36 bbl . ' 1 U. Uress ott cement and sidetrack well below 10-3/4" casing shoe. ,~ 11. Drill 9-7/8" hole as per directional plan to 8446' MD/4506' TVD (~150' below base ~~"3 OB). aE~ 12. Run DPC MDT. 13. Cleanout run to condition hole for running casing. 14. Run and cement 7-5/8" casing (displace cement with seawater). 15. RU E-line and run GR/USIT/CCL. 16. Set whipstock at ~8050' and mill window in 7-5/8" casing. While milling, displace ~~ seawater to 9.0 ppg drilling fluid. 17. Drill 6-3/4" OA lateral as per directional plan to 13,453' MD/4413' TVD. ~~ n1 ~ 18. Retrieve whipstock. ~g' ~, 19. Run 4-1/2" slotted liner (possibility of 4 swell packers with blank pipe isolation to ~ .~'~ isolate water-swept zones) and hang off in 7-5/8" casing. ~~~} 20. Displace drilling fluid to kill weight brine. ~~ 21. Run 4-1/2" jet pump completion. 22. Land tubing hanger and test. Test IA. 23. ND BOPE. NU and test tree. 24. Freeze protect inner annulus. 25. RDMO. 5 Tree: 4-1/16" - 5M FMC rig. KB elev. = 72.50' (Doyon 14) Wellhead: 11" x 4.5" 5M Ge M PS-01 A Propose~ig. GL. elev.= 38.30' (Doyon ~a~ w/ 4.5" TCII T&B Tubing Han r 4" CIW "H" BPV profile 20" x 34" insulated, 215 #/ft A-53 80' Camco 4.5" x 1"w/ BK-5 latch 2485~ I sidepocket KGB-2 GLM (2100' ND) 10 3/4" 45.5# L-80 BTC (Drift ID = 9.794, cap. _ .0961 bpf) 10 3/4" Super Seal II Float Shoe 3140' KOP below 10 3/4" shoe Max hole angle: 70° from 3520'-4020' 65.6° from 4218'-TD 4.5" 12.6# L-80 IBT-M tbg. (Drift ID =3.958, cap. _ .0152 bpf) Phoenix Discharge gauge (3.956" ID) 7842~ I 4.5" HES XD Dura sliding sleeve I (3.813" ID) 7853~ Phoenix gauge sensor (3.833" ID) 7873~ 4.5 HES X-Nipple (3.813" ID) 7889' 7-5/8" x 4.5" Baker Premier Packer 7900~ 4.5" HES XN-Nipple (3.725" no-go ID) 7949' WLEG 7960' Window in 7-5/8" csg @ -8060' Well angle @ window = 66° OA Lateral 4 1/2" Slotted Liner 12.6# L-80 IBT 7 5/8" 29.7# L-80 Casing 0-7000`:TCII 7000-8448':BTC-M ( drift ID = 6.750", cap. = 0.0459 bpf ) 8448' DATE REV. BY COMMENTS 03/07/07 ALM Proposed Completion MILNE POINT UNIT WELL S-01 A Project: Milne Point COMPANY DETAILS: BP ~~~~~~ Site: M Pt S Pad Calculatiun MethuJ: Minimum Curvaturc Well: MPS-01 ErrorSystem:ISCWSA Wellbore: Plan MPS-01A L1 Scan Meth«l: Trav. Cylinder Nurth~ ~~ ErtorSurface: EllipticalConic _ Plan: Plan MPS-01AL1 Wp 8 ~yarningMethuel: RulesBnsed ~ ~ 2640 ~ WELL DETAILS: MPS-01 Ground Level: 3830 Nurthing E:uting latittude LungituJe p.pp 6lHNHkkl.65 566076.93 70°24'38.WSN 149°?7'43.OII WELLBORE TARGET DETAILS ~ MAP CO-URDINATES) Name "I'VD +N/S +E'-W Nonhing Easting Shnpe MPS-OIATI 4402.61 3920.21 5728.53 6W4015.W 57177QW Puint MPSOlAT4 4412.61 8161.7? SU57.96 6W8250.W 5711M2.W Point MPS-OIA DDPoIy 4422.61 4602.81 6009.61 b01M7W.W 572045.W Pulygun MPS-OIA Fault I 4422.61 3735.7J 3W6.54 6W3R07.W 56911400 Polygon MPS-0lAFxult2 4422.61 87773U 5566.48 6W8870.W 571565.W Potygon MPS-UTAGeoFwly a-M132b1 ~(,02.81 6009.61 6W47W.00 572(W5.00 Polygun MPS-OIA'f? ~1-4??61 ~1G02.81 6U09.61 6W47WAH) 572U45.(~ Puint MPS-UTA'P3 -1~15_'.61 6448.50 5960.93 6U06545.W 57198U.IX1 Puint REFERENCEINFORMATION Co~ordinate (N/E) Refarence: yyell MPS-01, True North Vertical ~TV~1 Reference.- „ - . _ ~~ ftl 3~ dq 3i Meas6ted Dep:h Refnrence_ ~~ . ~:a 3~ 34 3~ s, Calcularior tilaihod: Mlnimum CurvaNrS SECTION DETAILS Sec MD Ine Azi TVD +N/-S +FJ-W DLeg TFace VSec Turget I 8063.00 65.65 6Q95 4350.74 3329.49 5162,06 0.(b QW 5549.30 2 8083.02 (7J4 59.6G 4358.6G 3338.60 5178.02 12.W -34W 5565.45 3 83U132 89.79 45.14 4401.14 3468.90 5345.50 12.00 -34b0 5764.43 4 8517.01 89.79 45.14 4401.92 3621.04 549839 O.W O.W 597418 5 8895.56 90.W 30.00 4402.61 392011 5728.53 4.0(1 -8924 6349.81 MPS-OIATI 6 8947.73 88.06 29?4 4403.49 3965.55 5754.31 4.W -158.68 6401.93 7 9132.75 SSA6 29.24 3409.77 4I26.~ 5844.64 O.W O.W 6586.66 8 963924 89A7 9.W 4422.61 4G02.81 61~.6I 4.W -87.42 7078.10 MPS-0IAT2 9 9716.63 88.46 5.96 4424.28 4679.51 6019.68 4.W -IU134 7148b0 10 10671.94 8H.46 5.96 4449.91 56Z9.31 6118.90 O.W O.W 8W8.20 II 11518.49 91.IH 332.2I 4452.61 644R.SU 5960.93 4.W -85.58 562130 MPS-0IAT3 12 1345551 9I.1H 332?I 4412.61 81(,1.72 SU5796 O.W OAO 9601.91 MPS-0IAT4 DD1=6 88 ~~ HALLIBURTON . ~ ~ CASING DETAILS 2880 . 8perry Drilling Services No TVD MD Name Size 28s0 ~ ~ 112.10 112.10 20" Conductor 20 ~ z 2374.92 3140.11 10 3/4" 10-3/4 ' 3120 3 4412.62 13455.00 41/2" 4-1/2 3120 Start Dir 12°/100' : 8063.00' MD, 4350.74'TVD L E G E N D 3360 3360 End Dir : 8301.58' MD, 4401.18' ND $ MPS-0~, MPS-o~, MPS-oi V4 ~ MPS-01, MPS-OtL1, MPS-01L1 V3 3600 Start Dir 4°/100' : 8518.16' MD, 4401.94'ND MPS-01, MPS-01L2, MPS-01L2 V5 3600 ~ ~ ~ ~ , End Dir : 8947.79' MD, 4403.49' TVD ~ MPS-01, MPS-01L2PB1, MPS-01L2PB1 V5 2 p ~ , ,~ ~ MPS-01, MPS-01PB1, MPS-OtP81 V7 ~ ~ 3840 ~ ~ ~~ Start Dir 4°/100' : 9132.81' MD, 4409.77'ND -0- MPS-Ot, Plan MPS-01A, MPS-01A WP 04 V38 3840 ~ $ Plan MPS-01AL1 Wp 8 ~ « ~ ~ End Dir : 9716.69' MD, 4424.28' ND m ~ p 4080 ~ ~ ; ~ , Start Dir 4°/100' : 10672' MD, 4449.91'ND 4080 ~ ~ , ' ' ' ' ~ ~ ~ ~ End Dir : 11518.55 MD, . 4452.61 ND ~ 4320 ~ . , ' , ~ ~ , ~ , ; - ; - ~ ', , ~ ~ ,' , Total Depth : 13455.57' MD, 4412.61' ND ~ 4320 y ~ , _a ~ ~ : - - --- -- ~ --- ~ -- H 4560 ~ ' MPS-01A DDPoI ' y; ' , ~ ~ , _-~_-~ ~ ` ~~ `\ ` iMPS-01A Faufl 2~ ' ~ 4560 , ~ ~ ~IAPS-01A T2 , , , ~ , ' , ~~ ~, 4800 MPS-01AT1 I ; ; MPS-01AT3~ ~, 41/2" ~. 4800 ~ ~ ; ~, ~ ' ~ MPS-01AT4 5040 ~~ , i ~, i i MPS-O1/MPS-01 ~ , ~~ 5040 , MPS-01/MPS-01A WP 04 i , i ~- ,t i; , 1PS Ot~'~ ~ ~ ~ MPS-01IPian MPS-01AL1 Wp 8 5280 ~,iP i ~ ~ ` 5280 ' MPS-01 /MPS-01 L1 ' MPS-01/MPS-01 L2PB1 5520 5520 ~-r-n 5040 5280 5520 5760 6000 6240 6480 6720 1~i r r 1~ ~ ~ r~n -r~T-~ 6960 7200 7440 7680 7920 8160 8400 8640 8880 ~~ i, ~ i r r 9120 9360 9600 9840 10080 10320 r~ 10560 Vertical Section at 31.79° (600 ft/in) COMPANY DETAILS: BP Amucu ~1~ Calculetion MethoJ: Minimum Curvuture Error System: ISCWSA Scan Method: Trav. CylinJer Nocth Error Surface: Elliptical Cunic Waming Methud: Rules Based +N/-&~~ +E;'-W Nurthing ~ O.W O.UO fiWW44.65 CASING DETAILS HALLIBURTONNo ND MD Name S;Z 1 112.10 112.10 20" ConduclQq Sperry Crilling Ssrvfcas 2374.92 3140.11 10 3/4" 103/4 3 4412.62 73455.00 4 1/2" q ~~2 Project: Milne Point Site: M Pt S Pad Well: MPS-01 Wellbore: Plan MPS-01A L1 Plan: Plan MPS-01AL1 Wp 8 SECTION DETAILS Sec Mp Inc Azi 7yD +N/-S tE/-W DLeg TFace VSec Target 1 8063.00 65.65 60.95 4350.74 3329.49 5162.06 0.00 0.00 5549.30 2 8083.02 67.74 59.66 4358.66 3338.60 5178.02 12.00 -30.00 5565.45 3 8301.32 89J9 45.14 4407.14 3468.90 5345.50 12.00 -34.60 5764.43 4 8517.01 8979 45.14 4401.92 3621.04 5498.39 0.00 0.00 597428 5 8895.56 90.00 30.00 4402.61 392021 5728.53 4.00 -8924 6349.81 MPS-01A T1 6 8g47,73 88.06 2924 4403.49 3965.55 5754.31 4.00 -158-68 6401.93 7 9132.75 88.06 29.24 4409.77 4126.90 5844.64 0.00 0.00 6586.66 8 963924 89.07 9.00 4422.61 4602.81 6009.61 4.OD -87.42 7078.10 MPS01AT2 9 9716.63 88.46 5.96 442428 4679.51 6019.68 4.00 -101.34 7148.60 10 10671.94 88.46 5.96 4449.91 5629.31 6778.90 0.00 0.00 8008.20 11 11518.49 91.18 332.21 4452.61 6448.50 5960.93 4.00 -85.58 8621.30 MPS-01AT3 12 13455.51 91.18 33221 4412.61 816172 5057.96 0.00 0.00 9601.91 MPS-OtAT4 LEGENO ~ MPS-01, MPS-01, MPS-01 V4 ~-- MPS-01, MPS-O1L1, MPS-01L1 V3 -~ MPS-01, MPS-O1L2, MPS-O1L2 V5 ~- MPS-01, MPS-01L2P81, MPS-O1L2P81 V5 ~ MPS-01, MPS-01PB1, MPS-O1PB1 V7 -~ MPS-01, Plan MPS-01A, MPS-01A WP 04 V38 ~ Plan MPS-01AL1 Wp 8 DDI= 6.88 x36o 7920 7480 7040 WELL DETAILS: MPS-OI Gruund Level: 3830 Easting L:ttittude 566076.93 70°2438.008 ` I ~i- MPS-01 A Fault Z REFERENCEINFORMATION Co-ordinate (N!E) Reterence: W NI MPS-01, True North Vertical (ND) Reference: 38.3 i 34.3 @ 72.60ft (38.3 + 34.3) Lungitude Slot Measured Depth Reference: 38.3 + 34 3(a~ 72.60N (38.3 + 34.3) N ~49~zT43 ~~ ~ W Calculation Method: Minimum Curvature WELLBORE TAR(iET DETAILS (MAP CO-URDINATES) Name 7'VD +N/-S +E/-W Northing Ex.ting Shape MPS-OIATI 4402.61 392011 5728.53 61H14015.W 571770.W Puint MPS-OIAT4 4412.61 8161.72 505796 6W8?SOAO 571062.00 Point MPS-OIA DDPuIy 442?.(~I 4G02.81 6009.61 6UlM7WA0 572U45.W Polygun MPS-OIAFaultl 4422.61 3735J3 3066.54 6W3807.W 569110.W Pulygon MPS-OIAFault: 4422.61 877730 ~566.48 600887400 571565.W Polygon MYS-OIAGeupuly 4422.61 4602.81 6009.61 601M7W.00 572045.IX) Polygon MPS-UTAT? 4422.61 4602.81 6009.61 6W47W.W 572(WS.W Point MPS-UTAT3 4452.61 6448.50 5960.93 bIX16545.W 571980.W Point ~( ~ ~5 ? _ - - - ytP~-~ ~ ~'~~.,n ~u,y01 nL~ V` p g • ~ - ~- -- - -- - MPS-OIA T4 " ~~ ~ ~ ~ `~ ~' \ \. \ ~` \ ~ \ \. ~ \ \. ' ~ \' \ \ \ \. `~ ~., ~:~\ Toul Depth : 13455.57' MD, 4412.61' TVD ~ \ ~ , .~~M _~~~~~ ~ A. _----- 66W \~-, \~' QS~ ~, \~ End Dir : I I518.55' MD, 4452.61' TVD `~ ~ ~~t3` \_ A \~ - MPS Ol A T3 0 ~ 6160 + ~ 5720 70 C -~ 5280 ~ 0 ~ 4li40 4400 3960 3520 3080 >~` ~QS ` . \ _ .:Q~ ~ ~ ~ Stan Dir 4",' I W' : I 1M72' MD, 4449.91'ND ~' _- ~ \ ,, ~ ~ ,\ I. .1 ,, " ~' I ,,- i '~ ~ ~~~ ~ ~: ' ~ eSA~ End Dir : 9716.69' MD. 4424.28' "1'VD ~ ~ p~i~ , ~ I t~~5 / ~' ,1 , f. '~ , ~ 1 ,~ ~ I ,' A1PS-01 A GeuEwh~ 7' Start Dir 4"/100' : 9132.81' MD, 4409.77'TVD -- - - -- MPS-UTA T2 - ~ MPS-U1.4 DDPuIy ~~~ ; / - _ ~ _ /: / / ~ ,--"~ ~ _ __ EnJ Dir : 8947.79' MD, 4403.49' TVD ~ ------'__ /_ -/--" Y ~ ~ ~ MPS-0IATI ~~ - / _. S1•rrtDir4°/100':8518.16'MD,4401.94'TVD / ~ . -r----- - --- - - -- / i i ~ ~ • ---- • ~ ,ii '-- , ,~~, ---___ ,, , ~~_ - ~so r ~-_ End Dir : 8301.58' MD, 4401.18' ND S ~ o ~ '~IP~.n;~iP~_n;~~~l'~~_~ SturtDirl2°/100':8063.W'MD.4350J4'7'VD 4400 4840 5280 5720 6160 6600 7040 7480 7920 8360 8800 9240 West(-)/East(+) (I 100 R/in) 8360 792~ 7480 7040 6600 ~ 0 c ~ 6160 ~ 0 ~ s 5720 ± 0 szxo ° C ° 4840 ~ ~ 4400 3960 ' 3520 ~i 3oso ! 2640 ~ ~J ;..:~~ °.Sperry_EDM .. _ C~x»p~rty BP Amoco ;:~p~:; ~ ~~~ Milne Point ~ ~~ ...: ,; M Pt S Pad ~!~ . MPS-01 ;iN~llb~st~. Plan MPS-01A L1 (',~~g~j; ' Plan MPS-01AL1 W p 8 , ,. Prt?j~c~: < Milne Point, North Slope UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea level Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Using geodetic scale factor . , :.. . . ~N's14. ~:.'., ~~ ~~ ; .. MPS-01 ,. ... .. . , Well Position +N/-S 0.00 ft Northing: 6,000,044.65 ft Latitude: 70° 24' 38.008" N +EI-W 0.00 ft Easting: 566,076.93 ft Longitude: 149° 27' 43.011" W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 38.30ft _ _ .. O~si~r~ ' Plan MPS-01AL1 W p 8 Audit Notes: _ _ _ Version: 21 Phase: PLAN Tie On Depth: 8,063.00 I __ _ . 0.00 0.00 0.00 __ 31.79 . , . _ _ I M~~tt S~rrlrflary. .. , ... MBasut'ed . ~' ~.~ ' ~ ~YectiCal ..~ ~ ~ ~' ~ ~ ~~ ~; ~~~t Btyild . Turn , t~ pth tnclinatioti J~imufh Depttr ~1Ht-~ +E/~M a ' „ F4st~ FIIa#e ' TF t? p „ ' .. }~;1~ . .. ' ' '' ~p~.. ~..: : .: ~ ~Oj ~ . . l .: ...~~"~ . ,' .. . . . . r'~~ , ~: 4 , /~~~. ' < ~-/~y ~, ~~M~7f4~ j ~ `~~~~~. .:. [ ~y~{. 1~~~Si41i~ ~" t . ~ ~#~ . < 8,063.00 65.65 60.95 4,350.74 3,329.49 5,162.06 0.00 0.00 0.00 0.00 8,083.02 67.74 59.66 4,358.66 3,338.60 5,178.02 12.00 10.42 -6.48 -30.00 8,301.32 89.79 45.14 4,401.14 3,468.90 5,345.50 12.00 10.10 -6.65 -34.60 8,517.01 89.79 45.14 4,401.92 3,621.04 5,498.39 0.00 0.00 0.00 0.00 8,895.56 90.00 30.00 4,402.61 3,920.21 5,728.53 4.00 0.05 -4.00 -89.24 8,947.73 88.06 29.24 4,403.49 3,965.55 5,754.31 4.00 -3.73 -1.45 -158.68 9,132.75 88.06 29.24 4,409.77 4,126.90 5,844.64 0.00 0.00 0.00 0.00 9,fi39.24 89.07 9.00 4,422.61 4,602.81 6,009.61 4.00 0.20 -4.00 -87.42 9,716.63 88.46 5.96 4,42428 4,679.51 6,019.68 4.00 -0.78 -3.92 -101.34. 10,671.94 88.46 5.96 4,449.91 5,629.31 6,118.90 0.00 0.00 0.00 0.00 11,518.49 91.18 332.21 4,452.61 6,448.50 5,960.93 4.00 0.32 -3.99 -85.58 13,455.51 ~ 91.18 332.21 4,412.61 ' 8,161.72 5,057.96 0.00 0.00 0.00 0.00 3/6/2007 6:22:14PM Page 2 of 6 COMPASS 2003.11 Build 48 ! Halliburton Company Planning Report - Geographic .Sperry_EDM BP Amoco Milne Point M Pt S Pad MPS-01 Plan MPS-01A L1 Plan MPS-01AL1 Wp 8 ~ Well MPS-01 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) True Minimum Curvature Plan MPS-01AL1 Wp 8 112.10 0.57 171.85 112.10 39.50 -0.38 0.05 6,000,044.27 566,076.99 0.00 -0.30 20" Conductor 3,140.11 65.51 50.57 2,374.92 2,302.32 1,057.96 1,275.16 6,001,113.75 567,342.56 2.17 1,570.99 10 3/4" 8,063.00 65.65 60.95 4,350.74 4,278.14 3,329.49 5,162.06 6,003,419.35 571,208.83 0.19 5,549.30 Start Dir 12°/100' : 8063.00' MD, 4350.74'TVD 8,083.02 67.74 59.66 4,358.66 4,286.06 3,338.60 5,178.02 6,003,428.60 571,224.71 12.00 5,565.45 8,100.02 69.42 58.42 4,364.86 4,292.26 3,346.74 5,191.59 6,003,436.86 571,238.21 11.99 5,579.52 8,200.02 79.47 51.60 4,391.67 4,319.07 3,401.99 5,270.28 6,003,492.80 571,316.40 12.00 5,667.93 8,300.02 89.66 45.22 4,401.14 4,328.54 3,467.98 5,344.57 6,003,559.44 571,390.10 12.00 5,763.16 8,301.32 89.79 45.14 4,401.14 4,328.54 3,468.90 5,345.50 6,003,560.36 571,391.01 12.00 5,764.43 8,301.58 89.79 45.14 4,401.14 4,328.54 3,469.08 5,345.68 6,003,560.55 571,391.20 0.00 5,764.68 End Dir : 8301.58' MD, 4401.18' TVD 8,400.02 89.79 45.14 4,401.50 4,328.90 3,538.52 5,415.46 6,003,630.59 571,460.35 0.00 5,860.46 8,500.02 89.79 45.14 4,401.86 4,329.26 3,609.05 5,486.34 6,003,701.75 571,530.60 0.00 5,957.75 8,517.01 89.79 45.14 4,401.92 4,329.32 3,621.04 5,498.39 6,003,713.84 571,542.53 0.00 5,974.28 8,518.16 89.79 45.09 4,401.93 4,329.33 3,621.85 5,499.20 6,003,714.66 571,543.34 4.00 5,975.41 Start Dir 4°N 00' : 8518.16' MD, 4401.94'TVD 8,600.02 89.84 41.82 4,402.19 4,329.59 3,681.26 5,555.50 6,003,774.56 571,599.11 4.00 6,055.56 8,700.02 89.89 37.82 4,402.42 4,329.82 3,758.05 5,619.52 6,003,851.90 571,662.44 4.00 6,154.56 8,800.02 89.95 33.82 4,402.56 4,329.96 3,839.12 5,678.04 6,003,933.48 571,720.23 4.00 6,254.29 8,895.56 90.00 30.00 4,402.61 4,330.01 3,920.21 5,728.53 6,004,015.00 571,770.00 4.00 6,349.81 M PS-01A T1 8,900.02 89.83 29.94 4,402.62 4,330.02 3,924.07 5,730.76 6,004,018.88 571,772.19 3.98 6,354.27 8,947.73 88.06 29.24 4,403.49 4,330.89 3,965.55 5,754.31 6,004,060.56 571,795.38 4.00 6,401.93 End Dir : 8947.79' MD, 4403.49' TVD 9,000.02 88.06 29.24 4,405.27 4,332.67 4,011.15 5,779.84 6,004,106.39 571,820.50 0.00 6,454.14 9,100.02 88.06 29.24 4,408.66 4,336.06 4,098.36 5,828.66 6,004,194.01 571,868.54 0.00 6,553.99 9,132.75 88.06 29.24 4,409.77 4,337.17 4,126.90 5,844.64 6,004,222.69 571,884.26 0.00 6,586.66 Start Dir 4°N 00' : 9132 .81' MD, 4409.77'TVD 9,200.02 88.18 26.55 4,411.98 4,339.38 4,186.32 5,876.09 6,004,282.38 571,915.19 4.00 6,653.74 9,300.02 88.37 22.56 4,414.99 4,342.39 4,277.21 5,917.62 6,004,373.63 571,955.90 4.00 6,752.88 9,400.02 88.57 18.56 4,417.67 4,345.07 4,370.79 5,952.71 6,004,467.51 571,990.16 4.00 6,850.91 9,500.02 88.77 14.56 4,419.99 4,347.39 4,466.60 5,981.20 6,004,563.56 572,017.80 4.00 6,947.35 9,600.02 88.98 10.57 4,421.94 4,349.34 4,564.17 6,002.94 6,004,661.30 572,038.68 4.00 7,041.74 9,639.24 89.07 9.00 4,422.61 4,350.01 4,602.81 6,009.61 6,004,700.00 572,045.00 4.00 7,078.10 MPS-01A T2 - MPS-01A DDPoIy - MPS-01A Fault 1- MPS-01A Fault 2- MPS-01A Geo poly 9,700.02 88.59 6.62 4,423.85 4,351.25 4,663.01 6,017.86 6,004,760.26 572,052.72 4.00 7,133.61 9,716.63 88.46 5.96 4,424.28 4,351.68 4,679.51 6,019.68 6,004,776.78 572,054.39 4.00 7,148.60 End Dir : 97 16.69' MD, 4424.28' TVD 9,800.02 88.46 5.96 4,426.51 4,353.91 4,762.42 6,028.34 6,004,859.76 572,062.32 0.00 7,223.64 9,900.02 88.46 5.96 4,429.20 4,356.60 4,861.85 6,038.73 6,004,959.26 572,071.83 0.00 7,313.62 10,000.02 88.46 5.96 4,431.88 4,359.28 4,961.27 6,049.12 6,005,058.76 572,081.33 0.00 7,403.60 10,100.02 88.46 5.96 4,434.56 4,361.96 5,060.69 6,059.50 6,005,158.26 572,090.84 0.00 7,493.58 10,200.02 88.46 5.96 4,437.25 4,364.65 5,160.12 6,069.89 6,005,257.76 572,100.34 0.00 7,583.57 3/6/2007 6:22:14PM Page 3 of 6 COMPASS 2003.11 Build 48 ~ Halliburton Company # Planning Report - Geographic Pt~nt-ed~t#k'vsY; Plan MPS-01AL1 Wp 8 ., : :..:. ... ..... . ... .... . ..... . ,. ~... ~~ ~ :~ -~ ~ ..: ; ' . ` ~ ~. ' , ~:. ~~ . ~. ' _ ; 141~ Incli~tior-~ P~t~titt~ '!'Ytr ~~ ,' '... ~37"VC~ ~ ~. ~ *NI~+S. ~ +El;W ~~~hit~ Ea~ti~# ~~ ~,~rt~~bn ~ Cf~?.; . , {°} : .' #°~..`,: . tft~ ; tft) (ft} (#k~ ~ff} . : Ift) ` t°lit~k)` ! (~X ~ 10,300.02 88.46 5.96 4,439.93 4,367.33 5,259.54 6,080.27 6,005,357.26 572,109.85 0.00 7,673.55 10,400.02 88.46 5.96 4,442.62 4,370.02 5,358.96 6,090.66 6,005,456.76 572,119.35 0.00 7,763.53 10,500.02 88.46 5.96 4,445.30 4,372.70 5,458.39 6,101.05 6,005,556.27 572,128.86 0.00 7,853.51 10,600.02 88.46 5.96 4,447.98 4,375.38 5,557.81 6,111.43 6,005,655.77 572,138.37 0.00 7,943.49 10,671.94 88.46 5.96 4,449.91 4,377.31 5,629.31 6,118.90 6,005,727.32 572,145.20 0.00 8,008.20 Start Dir 4°/100' : 10672' MD, 4449.91'TVD 10,700.02 88.55 4.84 4,450.64 4,378.04 5,657.26 6,121.55 6,005,755.29 572,147.60 4.00 8,033.35 10,800.02 88.86 0.86 4,452.90 4,380.30 5,757.09 6,126.52 6,005,855.16 572,151.68 4.00 8,120.83 10,900.02 89.18 356.87 4,454.61 4,382.01 5,857.04 6,124.53 6,005,955.07 572,148.81 4.00 8,204.74 11,000.02 89.50 352.88 4,455.76 4,383.16 5,956.61 6,115.60 6,006,054.55 572,139.00 4.00 8,284.67 11,100.02 89.83 348.89 4,456.34 4,383.74 6,055.33 6,099.76 6,006,153.11 572,122.29 4.00 8,360.24 11,200.02 90.16 344.91 4,456.35 4,383.75 6,152.70 6,077.10 6,006,250.28 572,098.77 4.00 8,431.07 11,300.02 90.48 340.92 4,455.79 4,383.19 6,248.27 6,047.72 6,006,345.57 572,068.55 4.00 8,496.83 11,400.02 90.81 336.93 4,454.67 4,382.07 6,341.56 6,011.77 6,006,438.53 572,031.79 4.00 8,557.19 11,500.02 91.12 332.95 4,452.98 4,380.38 6,432.11 5,969.43 6,006,528.69 571,988.65 4.00 8,611.85 11,518.49 91.18 332.21 4,452.61 4,380.01 6,448.50 5,960.93 6,006,545.00 571,980.00 4.01 8,621.30 End Dir : 11518.55' MD, 4452.61' TVD - MPS-01A T3 11,600.02 91.18 332.21 4,450.92 4,378.32 6,520.61 5,922.92 6,006,616.77 571,941.36 0.00 8,662.58 11,700.02 91.18 332.21 4,448.86 4,376.26 6,609.06 5,876.30 6,006,704.79 571,893.97 0.00 8,713.20 11,800.02 91.18 332.21 4,446.79 4,374.19 6,697.50 5,829.69 6,006,792.81 571,846.57 0.00 8,763.83 11,900.02 91.18 332.21 4,444.73 4,372.13 6,785.95 5,783.07 6,006,880.84 571,799.18 0.00 8,814.45 12,000.02 91.18 332.21 4,442.66 4,370.06 6,874.40 5,736.45 6,006,968.86 571,751.79 0.00 8,865.08 12,100.02 91.18 332.21 4,440.60 4,368.00 6,962.84 5,683.84 6,007,056.88 571,704.40 0.00 8,915.70 12,200.02 91.18 332.21 4,438.53 4,365.93 7,051.29 5,643.22 6,007,144.90 571,657.00 0.00 8,966.33 12,300.02 91.18 332.21 4,436.47 4,363.87 7,139.73 5,596.60 6,007,232.92 571,609.61 0.00 9,016.95 12,400.02 91.18 332.21 4,434.40 4,361.80 7,228.18 5,549.99 6,007,320.94 571,562.22 0.00 9,067.57 12,500.02 91.18 332.21 4,432.34 4,359.74 7,316.63 5,503.37 6,007,408.97 571,514.83 0.00 9,118.20 12,600.03 91.18 332.21 4,430.27 4,357.67 7,405.07 5,456.76 6,007,496.99 571,467.43 0.00 9,168.82 12,700.03 91.18 332.21 4,428.21 4,355.61 7,493.52 5,410.14 6,007,585.01 571,420.04 0.00 9,219.45 12,800.03 91.18 332.21 4,426.14 4,353.54 7,581.96 5,363.52 6,007,673.03 571,372.65 0.00 9,270.07 12,900.03 91.18 332.21 4,424.08 4,351.48 7,670.41 5,316.91 6,007,761.05 571,325.26 0.00 9,320.69 13,000.03 91.18 332.21 4,422.01 4,349.41 7,758.86 5,270.29 6,007,849.07 571,277.87 0.00 9,371.32 13,100.03 91.18 332.21 4,419.95 4,347.35 7,847.30 5,223.68 6,007,937.09 571,230.47 0.00 9,421.94 13,200.03 91.18 332.21 4,417.88 4,345.28 7,935.75 5,177.06 6,008,025.12 571,183.08 0.00 9,472.57 13,300.03 91.18 332.21 4,415.82 4,343.22 8,024.19 5,130.44 6,008,113.14 571,135.69 0.00 9,523.19 13,400.03 91.18 332.21 4,413.75 4,341.15 8,112.64 5,083.83 6,008,201.16 571,088.30 0.00 9,573.82 13,455.00 91.18 332.21 4,412.62 4,340.02 8,161.26 5,058.20 6,008,249.55 571,062.24 Q.00 9,601.65 41/2" 13,455.51 . 91.18 332.21 4,412.61 - 4,340.01 - 8,161.72 5,057.96 6,008,250.00 571,062.00 0.00 9,601.91 M PS-01 A T4 3/6/2007 6:22:14PM Page 4 of 6 COMPASS 2003.11 Build 48 ~ ~ Halliburton Company ~ Planning Report - Geographic ~ -~" . .: ~ . _ ,; .Sperry_EDM .. _ ~ ! LoC~I Co~ilit~ts R. . . . G~ .. !;` ~ . ~. . . _ • W ell MPS-01 rar~ ., BP Amoco 1"SfD:~teferenc~: ' 38.3 + 34.3 @ 72.60ft (38.3 + 34.3) Gt~ ;~; Milne Point ;~ M[~"~F~a~f`~tf~8; ~ ~;.~~ 38.3 + 3~.3~ @ 72.60ft (38.3 + 34.3) ; . . ` M Pt S Pad , Nt~elh Re'f8rv~rtce. ': : . True i MPS-01 , . ~t~~ii+$y !G;~~t?~t ~4tht~d `Minimum Curvature up~ . : Plan MPS-01A L1 jp; Plan MPS-01AL1 Wp 8 . ~~o~icTB~t~ifs Pl.an MP~-01A.L1 . ; ... ... :. . . . 'E'3tt3~ Tar$At NSme ..: .,: ' , +Nt~S +~/ W` : .. N~t't~ ~itt~ ;(~.. ; , ' , ... ~ ~ = 8halPs : . . f~ ;.`1`t t~ ... ` ; . . .:' {~1E~:. ; 4,422.61 MPS-01A Geopoly 4,602.81 6,009.61 6,004,700.00 572,045.00 - PolYqon Point 1 -858.02 -1,458.61 0.00 0.00 Point 2 -280.29 -932.65 0.00 0.00 Point 3 121.92 -124.10 0.00 0.00 Point4 230.13 1,368.15 0.00 0.00 Point 5 20.62 1,991.09 0.00 0.00 Point 6 -895.44 3,694.42 0.00 0.00 Point 7 -1,087.50 3,577.11 0.00 0.00 Point 8 -159.55 1,861.66 0.00 0.00 Point 9 15.12 1,370.05 0.00 0.00 Point 10 -92.15 -15.19 0.00 0.00 Point 11 -479.75 -755.86 0.00 0.00 Point 12 -1,017.29 -1,260.17 0.00 0.00 Point 13 -870.13 -1,470.50 0.00 0.00 Point 14 -858.02 -1,458.61 0.00 0.00 4,422.61 MPS-01A T2 4,602.81 6,009.61 6,004,700.00 572,045.00 - Point 4,422.61 MPS-01A DDPoIy 4,602.81 6,009.61 6,004,700.00 572,045.00 - Polygon Point 1 -925.17 -1,247.99 0.00 0.00 Point 2 -509.74 -866.61 0.00 0.00 Point 3 -435.18 -805.26 0.00 0.00 Point 4 -344.67 -636.04 0.00 0.00 Point 5 -161.61 -292.61 0.00 0.00 Point 6 -90.04 -116.22 0.00 0.00 Point 7 -50.38 70.46 0.00 0.00 Point 8 42.11 1,254.80 0.00 0.00 Point 9 -75.88 1,709.90 0.00 0.00 Point 10 -148.30 1,889.57 0.00 0.00 Point 11 -563.30 2,687.35 0.00 0.00 Point 12 -1,013.92 3,528.45 0.00 0.00 Point 13 -895.37 3,589.41 0.00 0.00 Point 14 -438.71 2,752.26 0.00 0.00 Point 15 -7.63 1,963.33 0.00 0.00 Point 16 54.61 1,763.76 0.00 0.00 Point 17 176.18 1,260.61 0.00 0.00 Point 18 91.48 53.20 0.00 0.00 Point 19 55.64 -154.51 0.00 0.00 Point 20 -41.05 343.68 0.00 0.00 Point 21 -236.22 -700.01 0.00 0.00 Point 22 -334.87 -884.16 0.00 0.00 Point 23 -430.37 -939.32 0.00 0.00 Point 24 -852.30 -1,377.65 0.00 0.00 4,402.61 MPS-01A T1 3,920.21 5,728.53 6,004,015.00 571,770.00 - Point 4,422.61 MPS-01A Fault 1 3,735.73 3,066.54 6,003,807.00 569,110.00 - Polygon Point 1 0.00 0.00 0.00 0.00 Point 2 1,236.47 -418.00 0.00 0.00 4,452.61 MPS-01AT3 6,448.50 5,960.93 6,006,545.00 571,980.00 - Point 4,412.61 MPS-01AT4 8,161.72 5,057.96 6,008,250.00 571,062.00 - Point 3/~2007 6:22:14PM Page 5 of 6 COMPASS 2003.11 Build 48 ~ Halliburton Company ~ Planning Report - Geographic 4,422.61 MPS-01A Fault 2 8,777.30 5,566.48 6,008,870.00 571,565.00 - Polygon Point 1 0.00 0.00 0.00 0.00 Point 2 -1,974.27 677.56 0.00 0.00 Point 3 -3,166.62 1,561.23 0.00 0.00 Point4 -1,974.27 677.56 0.00 0.00 ? ~rogttase+~ Casing Poir~s ` Nl~sur~i :: .. Yertical . Casi~ ;Hols . ; ~ Depth . ~ ; ~ . ~DeF~ " ~_ ~ ~ .. Diaurieter. . Diaineter~ ~.. . ! {ftJ . . ; (ft}. . ; . ~„} . ~"~ , ; ; ; 112.10 112.10 20 36 3,140.11 2,374.92 10-3/4 12-1/4 13,455.00 4,412.62 4-1/2 6-3/4 3/6/2007 6:22:14PM Page 6 of 6 COMPASS 2003.11 Build 48 ~ame ~N~S ~F~-W NaMiug f~ss~ing Lautwic Longiwd. Slut I Imcrq~laltun~lKhudMD In[cn'I '_S.W MPS-0I 69W ~67.49 M1OOOfA1M1.65 5(fi074.93 70°'_4'3R.WRN 149°~743011N' M1;q UcpthRangefrum X063U0 Tu. 13i5544 ~lazimum Rangc 15Y2 1? Ref ~nw~ Plan. Plan ~IPS-UTALI Wpri 0 -30 -o Z / `~s~i ~ ~, / / so Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ 15fdin] ~I j , i I4~M t~~ Wme~ Ylm ~ I'I.ui NPSLIA LI ('~Icului~ M 1 J~M1t i mtunvwrc . a..a+ y~. ,~ ~.~ i r n ' • X'I~ M1IRii~A .~~~~~~. ]ao ' I~.rt~rt 1yw~ n~. IS['N'Sa Scw~ McJuwi~. 'I'ru~~ C~~IinJcr Mrtth r.R~~~s~ia~:: cu~~~fai - c~., ~ x~~.u.~~~~. 1N.1 ~ IA.i 121A11 \1'nrning Mcth~d: Rulu Nu.N i~~d~ tM~in Y ~ Surtiny An~le iN 4 ~1~-W Ymnill'll ~i~r~ nai u.~o From Colour To MD 0 200 200 400 400 600 600 800 800 IOUO 1000 I500 I500 2000 ?000 ! ,",,• zsoo - 3000 - 3500 - 4000 - asoo - 5000 --- 6000 - 7000 - 0 From Colour To ~ 0 200 2 W 400 nrn 600 xoo ioot I50( 20IX ?sa 30IX 350( 400( 450( >00l 600( 7001 ~xooc ~ Halliburton Company ~ Anticollisio~ Report Company: BP Amoco Date: 3/6f2007 Time: 18:25:45 Page: 1 Field: Milne Paint ` Reference Site: M Pt S Pad Caordinate(NE) Ref~rence: ` Well: MPS-01, True Worth Reference Well: MPS-01 Vertical (TVD) Reference: ` 38.3 + 34.3 72.6 Reference Wellpath: Plan MPS-Q1A L1 Db:' Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error Model; ISCWSA Ellipse Depth Range: 8063.00 to 13455.49 ft Scan Method: Trav Cylinder No rth Maximum Radius: 1542.12 ft Error Surface: E~lipse + Casing Survey Program for De£nitive Wellpath Date: 10/31/2006 Validated: No Version: 1 Planned From To Survey Toolcode Tool Name ft ft 120.10 245.10 MPS-01 Gyro (120.10-245.10) (0 KPR-SS SDC Keeper single shots 367.26 3250.00 MPS-01 PB1 IIFR (367.26-11267.3 MWD+IFR+MS MWD + IFR + Multi Station 3250.00 8063.00 Planned: MP S-01A WP 04 V38 (5) MWD+IFR+MS MWD + IFR + Multi Station 8063.00 13455.49 Planned: Plan MPS-01AL1 Wp 8 V MWD+IFR+MS MWD + IFR + Multi Station Casing Points MD TVD ` Diameter Hole Size Name ft ft' in in 13453.31 4412.64 4.500 6.750 41/2" Summary - Offset Wellpath - ~ Reference Offaet ` Ctr-Ctr No-Ga Allowable ' Site Well Wellpath MD NID Distance Area Deviat3on Warning ft ft ft ft ft M Pt E Pad MPE-29 MPE-29 V2 Out of range M Pt S Pad MPS-01 MPS-01 V4 11389.13 10515.00 546.34 123.69 422.65 Pass: Major Risk M Pt S Pad MPS-01 MPS-01 L1 V3 11402.58 10530.00 529.70 120.10 409.60 Pass: Major Risk M Pt S Pad MPS-01 MPS-01 L2 V5 8319.63 8275.00 734.14 209.02 525.12 Pass: Major Risk M Pt S Pad MPS-01 MPS-01 L2P61 V5 8319.63 8275.00 734.14 209.06 525.07 Pass: Major Risk M Pt S Pad MPS-01 MPS-01PB1 V7 8878.45 8825.00 98.52 184.81 -86.29 FAIL: Major Risk M Pt S Pad MPS-01 Plan MPS-01A V2 Plan: 8124.66 8125.OQ 4.Q0 146.94 -142.93 FAlL: Major Risk M Pt S Pad MPS-02 MPS-02 V7 Out of range M Pt S Pad MPS-03 MPS-03 V21 Out of range M Pt S Pad MPS-03 MPS-03L1 V10 Out of range M Pt S Pad MPS-04 MPS-04 V7 Out of range M Pt S Pad MPS-04 MPS-04L1 V4 Out of range M Pt S Pad MPS-04 MPS-04L1 PB1 V13 Out of range M Pt S Pad MPS-04 MPS-04L1 P62 V9 Out of range M Pt S Pad MPS-05 MPS-05 V2 Out of range M Pt S Pad MPS-05 MPS-05L1 V2 Out of range M Pt S Pad MPS-05 MPS-05P61 V3 Out of range M Pt S Pad MPS-06 MPS-O6 V11 Out of range M Pt S Pad MPS-07 MPS-07 V9 Out of range M Pt S Pad MPS-08 MPS-08 V10 Out of range M Pt S Pad MPS-08 MPS-08P61 V9 Out of range M Pt S Pad MPS-09 MPS-09 V6 Out of range M Pt S Pad MPS-10 MPS-10 V14 Out of range M Pt S Pad MPS-10 MPS-10A V4 Out of range M Pt S Pad MPS-11 MPS-11 V5 Out of range M Pt S Pad MPS-12 MPS-12 V5 Out of range M Pt S Pad MPS-12 MPS-12L1 V2 Out of range M Pt S Pad MPS-12 MPS-12PB1 V2 Out of range M Pt S Pad MPS-13 MPS-13 V7 Out of range M Pt S Pad MPS-14 MPS-14 V6 Out of range M Pt S Pad MPS-15 MPS-15 V7 Out of range M Pt S Pad MPS-15 Plan MPS-15A VO Plan: Out of range M Pt S Pad MPS-16 MPS-16 V8 Out of range M Pt S Pad MPS-90 MPS-90 V6 Out of range M Pt S Pad Plan MPS - 00 Plan MPS-00 V2 Ptan: M Out of range ~~~~ File Type: A~~ File Number: 25518 - Printabie Case File Summary See Township, Range, Section and Acreage? ~ Yes ~ No U-3-1-13 ALL SECTION 25, T13N, R10E, UM 640 ALL SECTION 26, "" " 640 ALL SEC7'ION 35, " " " 64(} ALL SECTION 36, " " " b40 CQNTRINING 2, 560 ACRES. http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25518&... 3/ 12/2007 Alaska Department of Natural Resources Land Administration System Page 2 of 4 • ~ 10-23-~ 981 * * * UNIT1'ZED ~EGAL DESCRIPTION * * * MILNE POINT UNIT T13N, RIOE, UM , ` SECTION 25; ALL 640 ACRES SECTION 26, ALL 640 ACRES SECTION 36, ALL 64014CRES CONTAINING 1, 920 ACRES, MORE OR ~ESS. 04-23-1986 *** PARTICIPATING AREA LEGAL DESCRIPTION *** MILNE POINT PARTICIPATING AREA T13N, RIOE, UM SECTION 25.' ALL b40 AGRES ' '.SECTION26' EI/2NE1/4; 80ACRES > CON7'AINING 720 ACRES MORE OR LESS. F12- 07-1984 *** UNITIZED LEGAL DESCRIPTIQN *** MILNE POINT UNIT TY3N', RIOE,;U~LI SECTION 25; ALL 640 ACRES ' SECTION 26; ALL 640 ACRES ' SECTION 35, ALL 640 ACRES SECTION 36; ALL 640 ACRES CONTAINING 2, 56D ACRES, MORE OR LESS. 03-22-82 * * * ASSIGNMENT LEGAL DESCRIPTIQN * * * S~GMENT 1 T 13N, R IOE, UM http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25518&... 3/12/2007 -- - ~ ~ Alaska Department of Natural Resources Land Administration System Page 3 of 4 ~ ~ SECTION 25.~ ALL EXCLUDING NEI/4'4&0 ACRES : SECTION Z6: ALL 640 ACRES SECTION 35: ALL 640 ACRES ' j, ' SECTION 36.• ALL 640 ACRES i CONTAINING 2400 ACRES, MORE ~R'LESS. ' ' SEGMENT 2 - LAN~S ASSIGNED T 13N, R IOE, UM I SECTION 25: NEII4160 ACRES ' CONTAINING 160 ACRES, MORE ~R LESS ' *~:~*****~*~:*~********~**~******:~*~~*~*~~:**~:****~:~**~:~~~**:~~~**~:*~~**~*` I ASSIGNMENT LEGAL DESCRIPTION 3 2-84 ELIMINATES ,SEGMENT' 2 _NEW LEGAL DESCRIPTION: T. 13N., R. IOE., UMIAT MERIDIAN I SEGTIDN 25': ALL, '640 ACRES; SECTION 26.• ALL, 640 AC'RES; ; ' ' SECTION 35's ALL, 640 ACRES,• SECTION 36: ALL, 640 ACRES. CONTAINING 2560 ACRES, MORE OR LESS. *~:~:*~***~*~:*~**~;**~:*~*~~x~**~~~;***~~~*********~~*~*******~~***~**~***** 7-30-91 * * * *PARTICIPATING AREA LEGAL DESCRIPTION* * * SCHRADER BL UFF PA SAME AS THE UNIT LEGAL DESCRIPTIONABOVE; DATED 2-7'-84 I1-1-96 *** EXPANDED KUPARUK PA LEGAL DESCR~PTION *** http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25 518&... 3/ 12/2007 } Alaska Department of Natural Resources Land Administration System Page 4 of 4 • i T. 13 N., R IO E., U.M. SEC: 25: ALL; SEC. 26: El/2NE1/4,• ~' ~~ SEG~~~36: El/2NE1I4; ~ CONTAINING 800. 00 ACRES, MORE OR LESS. ~ t~ ~ t" Last updated on 03/12/2007. Not sure who to contact? Have a question about DNR? Visit the i~~.~z~Ii~ Ir~~c°rr~~t.i~ar~ ~"~nt,~r. Report technical problems with this page to the ~~~~~rr~~sfier. Site optimized for Netscape 7, IE 6 or above. This site also requires that all C~'3~KT~~ must be accepted. ~~ate ~f_Alas~a ~lat~rai Resources LA~ Hom~ ~o~yright Pr=v~cy 5ystem Sfatus http: //www.dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=25 518&... 3/ 12/2007 ~ ~ ~'RA~TS1~dI1"~'Ai, LET'~'E12 CHECKI.,I~'g' w~ ~, ~, r ~Nt~ ~~?l~GC ~ - D /~ ~ / ~~-D# Zo~c~ 3 7 V ~9evelopment 5ervice Exploratory~ Stratigraphec ~'est Yon-Conveational Wetl Circle 4ppropriate Letter / Paragraphs to be Included ia Transmittal Letter , ' CEIECK i ADD-ONS ~ I T'EXT FOR APPROVAL LETTER ,' VVHAT ~ (OPTIONS) ~ j APPLIES ! ! ; ~ ! I MliLTI LATERAL ~ The permit is for a new we(16ore se ment of existing ~ i ~ wel( ~~~ "~ t~ ~(If last two digits in ~ Permit ~lo.~ 'iD , API No. ~0~24 - 23~ /-~ ~; i API number ace ;~ I ; between 60-69) Production should continue to be repoRed as a function of the ~ i ~ original API number stated above. ' ~ ~ i PILOT HOLE i[n accordance with 20 AAC 2~.00~(~, ali records, data and logs ; ; ; acquired for the pilot hote must be clearly differentiated in both ~ i ; well nacne ( PI-i~ and API aumber ~ ~ '(~0- - -_) from records, data and lo~s ~ ~ ~ acquired for well I ~ SPACING The permit is approved subject to full compliance with 20 AAC ~ ! 6XCEPTION ~ 2~.0». Approval to perfora.te and produce / iJect is contingent ~ ; I upon issuance of a conservation order approving a spacing j 'i l exception. assumes the ' ~ i i liability of any protest to the spacing exception that may occur. i i i DRY D[TCH ; ~ Ali dry ditch sample sets subrnitted to the Commission must be in ; i SA!~IPLE I no greater than 30' samp(e interva(s &om below the permafrost or i ! ~ I from where samp(es are Frst caught and 10' samp(e interv~als j ,' ~ through target zones. ; ~ ;' Please note the fo[Iowing specia! condition of this permi*: ! ; Non-Coaventional i production or production testing of coal bed cnethane is not atlowed i i~'~'z~l ~ for (name of welll until after (Companv Name) has designed and ! ~ i i imp(emented a water well testing program to provide base(ine data ~ ; on water quality and quantity. (Co~any Name) must conta.ct the ~ Commission to obtain advance approva! of such water wel( testing ! ~ ~ program. ~ Rev: 12~i06 C:`jody~transmitta!_checkli;t ~ ~ ~ ~ ~~ ~~ - ~ ~ , , , ~ , , 0 ~ a N ~ ,~~ ~~ ~ ~~ ~~ ; ~ ~ ~ ~ ~ , ~ , ~ ~ ~ ~ ~ a~ ~ ~ , ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 7 ~ ~ N, y, ~ ~ ~ , ~ ~ ~ , ., , ~ ~ . , , . , ~ ., ~ , ~ ~ , ~ I ~ . , ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ , ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ N , , , , ~ ~ ~ . ~ ~ , , ~ , ~ , ~ ~ ~ ~ , ~ , ~ , ~ > ~i Q Q ~ ~ ~~ ~ ~ ~ . ~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~II ~ ~~ ~ ~ . , ~ ~ ~ ~ ~ . . ~ ~ , ~ ~ ~ ~ , , ~ ~ ~ ~ , , ~ , ~ , , , ~ ~ ~ , ~ ~ ~ . ~ ~ ~ . , ~ ~ ~ , . . ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ . ~ I I ~ ~~ ~ ~ ~ . . , ~ ~ ~ ~ ~ , , , , , ~ ~ ~ ~ ~ , . , ~ , . . , ~ .. ,I I ~ C~ ~ ~ , . . . , ~ ~ ~ . ~ , ~ ~ , . ~, . _ , ~ ~ ~ , . ~ ~ ~ ,~ ~ ~ .. ,. ., ~ '~ N~ ~ ' ~~ ~ '~.. , ~ , , ~ ~ , . , . , ~ ~ ~ . , ~ ~ ~i ~ ' ~ ., , ~ ~ .. , , ~, . ~~ . C ~ . . . ~I . ~ ~U. ~ . ~ ~ V' N. ~ ~ . . . ~ . ~ ~ ~ ~ , . . , , ~ ~ ~, ~ . ~I , ~ , . . . . . , ~ . . ~ ~ . _~ fE i ~ , ~ , , ~ . . ~ . . . ~. ~ ~ ~ ~ . . , ,. . ~, . , , ~ . . , ~ .. ~ ~ . ~ a ~ a ~ ' ~ a : ~ o V . , ~! . . p ~~ L ~ ~. Ea w ~ T ~ , Q~ N, ~ _ , ~ ~~ ~ ~~ ~ , ~ . ~ ~ . ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ . ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ , . , ~ ~ , ~ , . . ~ ~ ~ ~ , . VL ~, , ~ . . ~ . ~ ~ ~ ~ ljf.~ ~I . ~ ~ ~-a. ~ N ~ t , N~ ~ ~ ~~ ~ ~ , ~ ~ ~ ~ ~. I ~ _ ~ ~ ~ , ~ . O ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~ 'O. Ul, N, 4 I~, ~ ~ ~ . ~ ~ ~ ~ ~ . , ~ ~ p, . ~, fl; . , . , ~ I , 7 ~ , , C E O . a , ~, ~~ T n ( ~ V~ ~ p ~ , ~ , ~ ~ ~ . i ~, ~ . ~ pi a . ?~, , ~, ~~ . oi ~ ~ ~. ~~ m . m ~ ~ m eo ,~ a a> V , . ~ r, ~ ~ Q O ~. ~ i~. ~~ ~ ~~ ~ . ~ ~ ~ , ~ ~. 'I , ~ ~ ~ ~ ~~ 0~ ~ Q ~ ~, ~ ~ ~ ~ ~~ ~ M~ ~ ~ p. ~ r~ , ~ ~ ~ .~, m ~~ ~ ~, ~ ~ . .. ~ ~, . j i . , ~ ~ ~, ,C~ ~ dy~ N ~ ~~ ~ a, ~~ . ~ ~ ~ , tn~ ~ ~i ~ o, , ~ ~ ~ Q ~ o. , ~ 3 ~ ~ L l I ~ Z. , ~ a ~ ~ ~~ Q~ , ~ ~~~ V' ~ ~~ ~ a ~~ ~ ~ ~ ~ ~ , ~ ~ ~ . , y. . Q~ ~ ~ ~~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~.~, ~ I ~ , ~, ~ . ~ M. C~ ~~~ x N, ~ 7~ ~ ~ ~ ~, ~ , . , , ~ ~ . ~ p. ~ ~ U~ ~ C ~~ ~ C~, ~ ~ ~~, ~ I ~ ~ . . . . ~~ ~ . A . -~ ~ ~~ p~ c6~ ' p~ ~ ~ ~ , ~ ~ , ~ ., ~ ~ ~ . ~ ~ ~ ~ ~ ~ c, , ~ , 3~ ~ .. ~ ~ o ~~ Z ~ c~ a~ c. '~ o, c ~ _o~ , o ~ , . ~ ~ ~ , , ~ , , . ~ Q. Z ~, c. ~ ~~ ~. d~ ~ m~ ~ 4 . Q '~, , ~ -p~ a~ ~ ~ ~~ ~ p N. a~~ ~ , > ~ ~ y o a ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ M ~ Q ~ Q' Q~ o N ~' ~, ~ ~ ~ ~ ~,~ ~ ~~ ~ ~ ~. ~ ~ = a, ~ ~ ~ V a o ~ ° ~ , : ° ~ v ° a ti2 ~i g w a, . ~: Q ~ ° °- ~, a 3 a`~ a~ , ~ r~ ~ ~ co ~ ~~ ai ~ a ~ ~ p 00~ ~ ~~ I ~ ~ = ~ p N ~ ~, ,n~ o ~ w~ ~ O ~ , ~ , ~ l ° , ~ o~ p f ° ~ ~ ~ ~ Z y ~~ E, ~ ~~ ~ N ~ ~ ~ 3: ~ ~ ~ ~ ~ N~ ~ ~ N~ (6~ ~~ ~ ~ . ~ ~ . ~ ~ ~ ~ ~ . ~ . . , ~ ~ i ~ . ~ n~ p, 0., ~ ~ , ~ ~ ~ N~ ~l ~ `~ , ~ ~ ~, 7 ~, . . ~~~ ~ ~ ~ ~ ~ ~ ~ ~ m ~ ~S~ ~ ~~ ~ ' II .: ~ v ~ .. ~ _ . ~ ~ . ~ Q ~ ~ Q O~ o ~~ ~, , ~ ~ ~ . , , ~ ~~ V~ ~ ~ Q (n~ , Z~ -`p~ O V~ ~~ ~ p~ ~ ~~~~ N~ ~ ~ ~ N ~~ O~ C, ~~ .-~ O~ w O~. . 0 , ~ ~ . ~ , ~ .,,I i : N~ 3 ~ ~ p~ ~ "O d~ ~ ~ p~ Z, ~~ Q ~ M~ , ~'O~ _~ ap~ , ~ Z ~ ~ >~ 'm ~~ o ~~ _ F.., p `~ ~N ~ ~ i . , ~, ~ ~ ~ . , , , ~ . ~ , ~ a~' f4 d' C c' 'r ~ ~ ~ ° ' a _ ' ~ ~ ~ °' .~ ~ ~' ~ ~ °' ~ a ~`~ ~ ~ ~ ' 3 `~ ~ , , ~oi 3 ~ .fl o. ~ Q ~ - . _ ~ f6 ~ . ° ai ~ a W ~' w ~' ri ~' m ~ o ,~, , , i 0 ~ p~ . .. ~ ~: ~ N~ Y ~ ~~ O~ ~ m c V' u i 4' , ~. ~ ~~ a0~ ~ t0~ ~~ ~ ~ ~ , ~ ~ ~ , i ~; C ~ o o T ~ ~ ~ ~ N, ? ~ ai c~ a~ ~n ~ ~ o , ~? a; ~~ ~, ~~ c s 3 ~ m ~ ~ ~ ~ ~ 4 ~! ~ O~ ~, r~ °, J~ ~~ o, `4 . ~~ (9~ w~ E~ ~ ~ ~ ~ . ~ ~ ~ , , I ~ E u°'i~ ~ ~' O ~- . ~ m •~. O~ N, ,~~ ' ~~~ ~ ~ (6 ~ ~ ~~ ~ ~,~ m .o ~ ~ ~ Q, a~ ~ ~ ~ ~~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a~~ m ~,~~ E o o~ a, -a ~ m m ~, - y a~ ~ ~ ~ .c~ ~ ~~ ° ' Q 3, ° o, ~ N N = , a~, ~_ ~ ~ ~ Q ~Q ~•3 x- ~ ~ E ~, E ~ ~ ° c a~ ~ri ° 3 ; I N ,~, ~ ~ ~, ~ a ' Q ~, Y ~ ~ c~ S vi ~ m C9 z I ~, ~n . , ~, 'o, a o ~ _ ~ ~ ° o~ ~ °~ ~ o ~ ~ N c 6 °~ im ~ y. ~ ~ ~, 3 U E I ~, 3 a, ~. ~, o o, , ~ 3 . ~ I ~ c a ~ ~ a oS v ; o ~ irn E d Q ~' ~ ~ Z ~ ~ a -O, a~, ~ ~ ~ v, Q~ ~ _ a~ , i ~ a m ~ f4 ~ p~ e~ ] o . N ~' .yU ~ _ m ~ . o, n' Q 'R (V~ ~ ~ Q~ a N~ ~ I N `,~~ Q M~ WI a ~~ Q .~..~~ ~~ C)~ _C~ j, . ~ ~ ~ . , ~ , I , C~~ Q' ~ d'~ fn ~ ~' ~ M' d' Cf~ ~~ , ~~ ~ ~ V.. ~~ (jf~ . ~ oi ; i II ~ . Q, Z t/N N~ ~ N~ tA~ N~ N, 1' ~ N N, ~ ' N~ N, ~ Vl~~ UI~ N~ N, Ul~ N~ (n~~ N, N, N. N~ N~ y N Q~ Q, ~ Q, Q~ I ~ ~~ ~ Q~ Q~ Q~ ~ Q, ~ ~ O, Q, (n.. N. ~ Q~ V)~ ~ N~ Q~ . (~~ O, N, f~~ U/~ N, N, N~ ~ N, O~ ~~ Q: _; t/n N. U) N~ Q~ Q~ Q. ' p_ . . , . - . . ~, ~', ~, ~", ~', ~', ~' Z, Z, Z, Z, I Z, Z, Z, Z, Z, Z, ~', Z ~', Z. Z, ~, ~, ~, ~". Z~ Z~ ~., ~, Z~ Z, Z~ ~ . , . , , , ~ , ~ ~ ~ i ~ ~ ~ ~ ~ `0~ ~ ~ . ~ ~ , ~ ~ , ~ ~ ~ , ~ ~ ~ ~, ~ ~ - ~ , ~ . . , ~ . ~ ~ ~ , ~ ~ ~ ~ ~ . ~ ~ . ~ ~ ~ ~ ~ y c6 , . , ~. ~ , ~ , . , ~ LL~ ~ ~ T ~ , ~ . , ~ ~ ~ . ~ ~, ~ , ~ , , , , ~ ~ . ~ . ~ , , , . ~ , ~ ~ . ~ ~ . . ~ ~ ~ ~ 'I V , , ~ , ~ ~ , ~ y, ~ ~~ I . . , ~ , ~ ~ , ~ ~ , ~ , ~ , i , ~ , ~ ~ ~~ ~ ~ , ~ ~ , , ~ ~ , , . ~ ~ , , ~ C, N. ~ , I _ N~ , I . . ~ ~ , ~ ~, ~ ~ ~ ~ ~. ~ , , ~ , ~ ~ ~ , ~ ~ , ~ ~ , , ~ ~ , ~ ~ ~ ~ I ~. I, , , , ~ I ~ ~ V ~ ~ ~ ~ ~ ~ ~ ~ , , ~ ~ ~, ~ ~~ ~ ~ . ~ ~ ~ ~ ~ ~ ~ ~ , ~ , ~ ~ ~ O ~ ~ ~ ~ . ~ ~ ~ ~ . ~ Q~ ~~ p~ I ~ ~ ~ ~ ~ , ~ ~ ~ ~ , ~ ~ ~ , . ~ ~ ~ ~ ~ , v ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~: , ~ ~ ~ ~ ~ N ! . ~ ~ , ~ ~ ~ ~ ~ , ~ ~ ~ C~ N I ,C, , , ~ ~ ~ ~ , , ~ . ~ ~ ~ . . ~ ~ p~ , ~ ~ ~ ~ tn i . ~ ~ , ~ . ~ ~ ~ , ~ ~ ~~ O~ C. , . ~ ~ . ~ ~ . , . ~ ~ ~ . , ~ , . ~ ~ T i .~ ~ , ~ , ~ , , a~ - a~ 3 a ~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ a~, 3 ~ . ~ ~ ~~ a O ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ O , ~ ~,~ ~ ~ ~ ~ ~ ~ , ~ ~ ~ ~, ~ ~ ~ U ~ ~ ~ ~ ~ ~, ~ .J ~ ~ ~ ~ , ~ , ~ ~ ~ ~ . . ~ ~ ~ ~ ~ . ~. O, ° Z, ~~ ~ ~~ ~, II ~ ~ , ~ . ~ ~ ~ ~ ~ ~ ~ ~ ~~ N~ , ~ , ~ ~ ~ ~ ~ ~ a~i~ ~~ ~ ~ ~ ~ ~ ~~ N~ ~ ~ ~ ~ ~ ~ , ~ ~~ ~ m Q' ~ ~ , ~ ~ s ~ ~ . . ~ ~ ~ ~: ~ N~ N, ~ ~, a I y~ N, ~ ~, ~ ~ V ~ ~ ~ ~ o Q , ~ ~ ~~ ~ ~ U, ~ ~ ~ O~ Q, ~ ~. , ~ Q LLj ~ ~ ~C O, N~ ~ ~ ~~' ~ ~ . , ~ . ~ Q ~ ~ f6~ ~ ~ ~ ~ ~ ` ~ . ~ N~ [] ~ I ~ ~ , ~ ~ ~ ~ ~ , ~ ~ ~ ~ O~ o. ~ Q ~ -~, ~~ . i o Q ~ ~ ~. ~, ~ N, ~ y~ o, ~ (6~ c ~ ~ a. ~ ~ C, ~ m ~j. ~ ~ ~~ ~ ~ ro ui ~ . ~~ r Y ' '~ ' N 'O '" N 'O' N ~ U e- ' ~~ U. ' ~, ~~ ~, 'y~ 00~ c._.~ ~ N~ ~~ O ~ , ~ ~ ~ ~ ~ ~, _ ~, ~ ~ p, ~ ~ ~ ~ y ~ N~ ' 7 .~ ~i p' I . , , ' C, ~~ ~: , ~~ N ~, 4 ~ C ~~ ~~ N~ , . ~ ~' I i ~ 3 C ~. > 3 ~ ~ M j~ U ~~ N~ a ~ O ' N ~ p, ~~ 0 ~. ~'. 'p~ N~ , ~ tp. I--' ~I , ' ~. .C N ~ ' ' N (0 ~ 7. .'~-! ~, O I , ~. 'O O, 0, ab . ~ (0 N~ p~ , M, -a , ~. 7, ~ ~.. Z ~ Z ~ ' 'O O ~ ~ ~ U ~ .rA' f6 -o 7~ m ?i a~ I N, ~ a '(n' C aD ,L~ ~ m , C N' 7 a` ' ~ ~' ~. ' Q• N, N' N ~ i ~ ~ , ~ -o = a~ o~ m ~ • ' ~ ~a > ~.-. I r ~, o ~ ` ~ > ' o -a, o m ~. ~ ~ a N ' ' s, m c = ' ~ _ o 0 o 2 d Y ; ~ o E o = a, -`o' ~ c ., o E ~ ~ ~ a~ ; o ~ ~~ 3~ N ' ~.- 3 c o ° aS ~ ~ c °~ ~' ~ a~ o °: a~ N t n '~ a >' w U~ v~-. ~~ ~ U ~' V~ ~ a~ N O ~ i ~~ Q ~ ~~ a> U~ ' fl, ~, - a~ ~ o; ~ a ~ 3 j ~~ ~ ~ ~~ Y i Z ~i g . . N p, ~'~ ~ ~ C . C~ ~ , C ~ o o p , - • ~ ~~ ~ C, Y~ C ~ LS o ~ z (6 G ~ ~ (6 ~ Q ~° f6 ~ N~ i -O O, Oi p, ~ ~ ~ ~ ~, ~- c c ~ m ~ ~ ; ~ ~ ~ ~n ~ - c , n ° ~ m ~ u > o 3 ~,o fl °~ ~ ~-° _ 3 ~- s i I Q , m ~, ~v m ~ ,Q m, Q .c n°3 ' .c ~ -a m ~, ~ ~ , -o E o a~ f9 ~ , ~, c a? ~, N, r~ , ._ ~~ +n > ~~ - o~, . o Q 3 i ° ~ 0 ~ ~ ` ' Z ~ a, w in a rn ~ > m 3 ~°, . 3 a~ ~, ~ ' •• o -o "' 4 ... 3<a a ~ o ~ c~. y ~ ° " ~n Q- . ° u~ ' ~u , 0 I 3 .°~~ u a> ~ o o O ' o f0 N o, (4 ~ ~~ N N o ca ~ o c ~ o~ o. ~ o ~ o O a, , - E~ N m - ~ L ~ O N Q ~, N C~ ~ Q ~ 6, L' fl. , ~' ~ Q ~ ~~ ' ~ ~~ 4 f~~ rn ~ ~ N~ V I fl" ~ ~ , ~ y N, - ~. y ~, '6 ~' ~' OI V~ N. '' i - ~' C' O t~' ~ p °tS ~ ~ ~ E~ : o . o, °S a~ . ~ a ~n ~? Q m -~, ~ 'c ti, rn a~ . .. ca m rn ~: o a~ ~i ~ . 3= a , N °' ,n o: Q ~ pl i ~ a~ ~ .S n `o. ~ N . T ~, ay . a~ ~ ~ ~3 .c ~ ~ rn'I ~, ~? a. o. a`~ ~ i ~ ~ ~ ~~ ~ ~ f6 0 ~ o: o ~ ~ >, ~ ~ ~ li al ~~ ~~ -~ v~ -o. -o~ ~ ._~ m ~~ ~, ~. ~~ -a~ ~ ar ~ :n' • ~ o a o .Q ~~ t~ 3~ ~ :~ ~ ~ ~~ o °~ a c~ ~ c~ a~ ~' xl ~ ~ ~ a~, ~ N m ~ o s c m c m E a; 3 v, I ~~ m o ~ <u c> °~' _ o ~ a ~~ . ~, i ~~, ~? m i, a N ~ ~ u ~ ~' W ~ ~ c 3 m ~ m, ~ ~ ~ ~ o o ~ ~ m, ~ , y i a> , o _ _-a a?, .- - ~ ~ ~ Q~, = c . . ~ ~ l ~ • a " ~ ~ -°, o °, .~ .m ~ "'" ' a ° ~ ° o ~, ca~i' y ~ ~ ~ ~ ~ ~ ~ w: ~ W 3 ~ ~ "' °- U ~ ~ ,,,,,~~°' ml E ~' a- . - - r ~ ~ ~ E Q ~ - a 3, n ~ ~ I a3 en F- ~ ~. .. a ~ a. ~ c' a: , a, Y ° .r ~' °' o' ' ~' ~ ~ E' ~' ~`, >, ~:~ az o-, a -~ c, a~ ~, ~; °> ~, a ~, a cn y- ~ c~ O O a, a~ a, m U ~ ~. Q; o a; Z; o~~ c~ s~ ._ ~ U ~ m c~ U ~ ¢, ~6 -, a, '~ d 4- - O m o O. c m U ° ~, N', ~% ~ ~ w ~ ro, o, y d cn, cn, o c~ ,m °' ~ Q ~ -- N - M V _. ____. ~ _ (O -. I~ 00 .-_ o ~ ~ e- ~ ..___ . c~ ~ _.._ r> ~ _-_ v ~ ___ u~ ~ _ co ~ ~ r _._._ m ~; r- -- - ~; _ r~ c^ CV N _.. _ er N __._ ~ N , cn ~ N N .._._- , ~o c,~ N N .__._ o M M ._.._ c~ r> M M _. _.___ v M. - cn M cfl M __._- ~ ao M M ..__ rn M __.. U N ~ o ~ 0 ~ 0 ; ~ O ~ f~6 N ~ ~ fC o 10 O ~' ~ M ~; ~ O 'a. i ~ p ~ M ~ ~~ . W C ~' ~ ~ ~.. . ,~i ~ ~ M O .v.~ . N f /l C y d ~ ~y ~~~, A ~ ~.~1' ~* • a o . ~ a g ~ ° a o ~;.o "'~~'~, a ~ a a a ~ ~ ~ w aw a~- i ,, i ~ ~ c'c~n a `t ~ N ~ ~ ~ N c c> n d ~ ~ N ~ ~ ~ J rn~ c ~ 0 ~ N C .~ w` o ~ ~ ~~ m ~ ~~ '~ ~' J a`~ U ~ O o `° N ~ O ~~ ~U Q • Well f-iistory File APPENDIX Information of detailed nature that is not ~ pa~ticula~iy germane to the Well PeRnitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ mps-Olall.tapx Sperry-Sun ~rillin9 services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Sep 21 13:52:22 2007 Reel Header Service name .............LISTPE ~ate . ...................07/09/21 Ori 9in ...................STS Reel Name. .... ........UNKNOWN continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date . ...................07/09/21 origin ...................5T5 Tape Name. .... ........UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Physical EOF ~ Scientific Technical services ~ibrary. scientific Technical services Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: MPS-OlA L1 API NUMBER: 500292314162 OPERATOR: BP Exploration LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 25-JUL-07 # JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 4 ~06 NUMBER: Mw0005043233 Mw0005043233 Mw0005043233 LOGGING ENGINEER: J. BOBBITT J. BOBBITT A. MUNRO OPERATOR WITNESS: E. VAUGHN G. BURLY J. HABERTHUR MWD RUN 5 706 NUMBER: Mw0005043233 LOGGING ENGINEER: A. MUNRO OPERATOR WITNESS: J. HABERTHUR # SURFACE LOCATION SECTION: 7 TOWNSHIP: 12N RANGE: 11E FNL: FS~: 3375 FEL: 4714 FWL: Page 1 ~ O~-f~~ ~ ~ ~t3 ~ ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: ~ mps-Olall.tapx 72.04 38.30 # WELL CASING RECORD OPEN HOLE BIT SIZE (IN) 1ST STRING 9.875 2ND STRING 6.750 3RD STRING PRODUCTION STRING # REMARKS: CASING DRILl.ERS SIZE (IN) DEPTH (FT) 10.750 3140.0 7.625 7923.0 1. ALL DEPTHS ARE BIT DEPTNS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (ND). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A WHIPSTOCK, THE TOP OF WHICH WAS AT 7923'MD/4300~ND IN THE MPS-OlA WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND ABOUT 20' OF RAT HOLE WERE DRILLED DURING MWD RUN 4. ONLY SROP DATA ARE PRESENTED FOR THIS RUN. 4. MWD RUNS 1,2,5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND PRESSURE WHILE DRILLING (PWD). ROTATED ALD DATA OVER SLIDE INTERVALS BELOW ABOUT 6450'MD WERE ACQUIRED AFTER DRI~LING THE INTERVALS. THESE MAD DATA WERE MERGED WITH THE MWD DATA. MWD RUNS 1,2 AL50 INCLUDED ACOUSTIC CALIPER (ACAL). MWD RUN 5 INCLUDED AT-BIT INCLINATION (ABI). 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO THE SPERRY DRILLING SERVICES MWD GAMMA RAY LOG FROM MPS-01. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 8 JUNE 2007, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST). THE SHIFTED GAMMA RAY LOG IS CONSIDERED PDC FOR MPS-OlA. 6. MWD RUNS 1,2,4,5 REPRESENT WELL MPS-OlA L1 WITH API#: 50-029-23141-62. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10500'MD/4402'ND. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA Page 2 • • SHALLOW SPACING), mps-Olall.tapx SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZES: ACAL-DERIVED (BIT SIZE 9.875~~) MUD WEIGHT: 8.8 - 9.5 PPG MUD SALINITY: 1000 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......5T5LIB.000 Comment rtecord FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD ~epth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2808.0 10430.0 PEF 3126.5 10418.5 RPx 3126.5 10437.0 FCNT 3126.5 10404.0 RPS 3126.5 10437.0 NCNT 3126.5 10404.0 DRHO 3126.5 10418.5 RHOB 3126.5 10418.5 RPM 3126.5 10437.0 RPD 3126.5 10437.0 NPHI 3126.5 10404.0 FET 3137.0 10437.0 Page 3 ~~ ~ ROP 3141.5 mps-~0496.papx CA~A 3152.0 7919.0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 2808.0 2800.5 2809.5 2802.0 2812.5 2804.5 2819.5 2815.0 2827.5 2819.5 2832.5 2829.5 2840.5 2834.5 2843.0 2838.0 2848.0 2841.0 2853.5 2847.0 2885.5 2882.5 2897.0 2896.0 2911.5 2907.5 2930.0 2926.5 2967.5 2965.0 3008.0 3007.0 3020.5 3019.0 3026.5 3024.5 3032.5 3031.5 3067.0 3064.0 3073.0 3070.5 3077.5 3075.0 3089.0 3086.5 3092.0 3091.0 3109.5 3106.0 3117.5 3118.5 3128.0 3133.0 3141.0 3144.5 3146.0 3150.0 8386.0 8390.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MwD 1 2800.5 7238.0 MwD 2 7238.0 7923.0 Mw~ 4 7923.5 7952.0 wD 5 7952.0 10500.0 $ # REMARKS: MERGED MAIN PA55. $ # ~ata Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units. . .. .. ..... Datum Specification Block sub-type...0 Page 4 ~ ~ mps-Olall.tapx Name servi ce order units size Nsam Rep code offset Channel DEPT FT 4 1 68 0 1 CALA MWD INCH 4 1 68 4 2 FCNT MWD CNTS 4 1 68 8 3 NCNT MWD CNTS 4 1 68 12 4 RHOB MWD G/CM 4 1 68 16 5 DRHO MWD G/CM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 RPM MWD OHMM 4 1 68 28 8 RPS MWD OHMM 4 1 68 32 9 RPX MWD OHMM 4 1 68 36 10 FET MWD HOUR 4 1 68 40 11 GR MWD API 4 1 68 44 12 PEF MWD BARN 4 1 68 48 13 ROP MWD FT/H 4 1 68 52 14 NPHI MWD PU-S 4 1 68 56 15 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 2808 10496 6652 15377 2808 10496 CALA MWD INCH 8.8 12.84 10.3522 9535 3152 7919 FCNT MWD CNTS 108.7 3524.9 599.621 14556 3126.5 10404 NCNT MWD Cti7s 13892.6 191696 88622 14556 3126.5 10404 RHOB Mw~ G/CM 1.042 2.861 2.16054 14585 3126.5 10418.5 DRHO MWD G/CM -2.586 0.6 0.042779 14585 3126.5 10418.5 RPD MwD OHMM 0.31 2000 15.4728 14622 3126.5 10437 RPM MwD OHMM 0.23 2000 14.1892 14622 3126.5 10437 RPS MWD OHMM 0.58 2000 14.1007 14622 3126.5 10437 RPx Mw~ OHMM 0.34 547.02 12.0047 14622 3126.5 10437 FET MwD HOUR 0.18 213.73 1.14113 14601 3137 10437 GR MwD API 6.1 120.68 67.5171 15245 2808 10430 PEF MwD BARN 0.38 12.31 2.22275 14585 3126.5 10418.5 RoP Mw~ FT/H 0.08 429.63 175.305 14710 3141.5 10496 NPHI Mw~ au-s 8.05 98.59 35.5122 14556 3126.5 10404 First Reading For Entire File..........2808 ~ast Reading For Entire File...........10496 File Trailer service name... .......STSLIB.001 Service Sub Level~Name... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical rtecord..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF Fi12 Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......STSLIB.001 Page 5 ~ ~ mps-Olall.tapx Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 2800.5 7192.0 NPHI 3130.5 7147.0 RPD 3130.5 7184.5 FCNT 3130.5 7147.0 NCNT 3130.5 7147.0 RPx 3130.5 7184.5 RPM 3130.5 7184.5 RPS 3130.5 7184.5 PEF 3131.0 7161.0 RHOB 3131.0 7161.0 DRHO 3131.0 7161.0 FET 3141.0 7184.5 RoP 3145.0 7238.0 C,4~A 3156.0 7149.5 $ # LOG HEADER DATA DATE LOGGED: 23-MAY-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7238.0 TOP LOG INTERVAL (FT): 3145.0 BOTTOM LOG INTERVAL (FT): 7238.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 63.2 MAXIMUM ANGLE: 70.5 # TOOL STRING (TOP TO BOTfOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RE5I5. 4 230203 CTN COMP THERMAL NEUTRON 174114 ALD Azimuthal L itho-Dens 224807 ACAL Acoustic Caliper $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3140.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.15 MUD VISCOSITY (S): 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 4.400 72.0 Page 6 ~ MUD AT MAX CIRCULATING MUD FILTRATE AT MT: MUD CAKE AT MT: # # # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: ~ mps-Olall.tapx TERMPERATURE: 3.350 96.8 3.400 72.0 4.600 72.0 # Data Format specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet oata rteference Point ..............undefined Frame Spacing....... ............60 .1zN Max frames per record .............undefined ,4bsent value ......................-999 Depth units. . .. .. ..... Datum Specification Block sub-type...0 Name service order units size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 CALA MWDO10 INCH 4 1 68 4 2 FCNT MWDO10 CNTS 4 1 68 8 3 NCNT MwD010 CNTS 4 1 68 12 4 RHOB MWDO10 G/CM 4 1 68 16 5 DRHO MWDO10 G/~M 4 1 68 20 6 RPD MWDO10 OHMM 4 1 68 24 7 RPM MWDO10 OHMM 4 1 68 28 8 RPS MWDO10 OHMM 4 1 68 32 9 RPX MWDO10 OHMM 4 1 68 36 10 FET MWDO10 HOUR 4 1 68 40 11 GR MWDO10 API 4 1 68 44 12 PEF MWDO10 BARN 4 1 68 48 13 ROP MWDO10 FT/H 4 1 68 52 14 NPHI MWDO10 PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT ~ 2800.5 7238 5019.25 8876 2800.5 7238 CALA MWDO10 INCH 8.8 12.84 10.3304 7988 3156 7149.5 FCNT MWDO10 CNTS 401,82 1493.67 750.779 8034 3130.5 7147 NCNT MWDO10 CNTS 98857 150932 123001 8034 3130.5 7147 RHOB MWDO10 G/CM 1.042 2.861 2.06934 8061 3131 7161 DRHO MWDO10 G/CM -2.586 0.297 0.026266 8061 3131 7161 RPD MWDO10 OHMM 0.54 2000 16.3152 8109 3130.5 7184.5 RPM MWDO10 OHMM 0.41 2000 14.9887 8109 3130.5 7184.5 RPS MWDO10 OHMM 0.86 2000 15.2242 8109 3130.5 7184.5 RPx MWDO10 OHMM 0.85 146.18 12.9006 8109 3130.5 7184.5 FET MWDO10 HOUR 0.18 7.62 0.649048 8088 3141 7184.5 GR MWDO10 API 6.1 120.68 62.124 8784 2800.5 7192 PEF Mw~010 BARN 0.38 12.31 2.18354 8061 3131 7161 RoP MwD010 FT/H 0.08 429.63 215.224 8187 3145 7238 NPHI Mw~010 Pu-5 15.96 98.59 36.7713 8034 3130.5 7147 Page 7 • ~ mps-Olall.tapx First Reading For Entire File..........2800.5 ~ast Reading For Entire File...........7238 File Trailer Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical Record..65535 File TyC~ e ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 7147.5 7923.0 FCNT 7147.5 7923.0 NCNT 7147.5 7923.0 CALA 7150.0 7923.0 DRHO 7161.5 7923.0 PEF 7161.5 7923.0 RHOB 7161.5 7923.0 FET 7185.0 7923.0 RPM 7185.0 7923.0 RPD 7185.0 7923.0 RPx 7185.0 7923.0 RPS 7185.0 7923.0 GR 7192.5 7923.0 RoP 7238.5 7923.0 $ # LOG HEADER DATA DATE LOGGED: 25-MAY-07 SOFTWARE SURFACE SOFTWA RE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7923.0 TOP LOG INTERVAL (FT): 7238.0 BOTTOM LOG INTERVAL (FT): 7923.0 Page 8 ~ BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # # # # # # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CTN ALD ACAL $ mps-Olall.tapx BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMP THERMAL NEUTRON Azimuthal Litho-Dens Acoustic Caliper BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ # ~ata Format specification rtecord Data Record Type... ..........0 ~ata Specification Block Type.....0 Log~ing DireCtion .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth Units . .. .. ..... ~atum specification Block sub-type...0 • 62.3 67.2 TOOL NUMBER 10718517 230203 174114 224807 9.875 3140.0 Fresh Water Gel 9.50 .0 8.0 600 6.0 4.600 72.0 3.270 104.0 6.000 72.0 5.000 72.0 ivame service order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 CALA MWD020 INCH 4 1 68 4 2 FCNT MWD020 CNTS 4 1 68 8 3 NCNT MWD020 CNTS 4 1 68 12 4 RHOB MWD020 G/CM 4 1 68 16 5 DRHO MWD020 G/CM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 RPM MWD020 OHMM 4 1 68 28 8 Page 9 ! C mps-Olall.tapx RPS MWD020 OHMM 4 1 68 32 9 RPX MWD020 OHMM 4 1 68 36 10 FET MWD020 HOUR 4 1 68 40 11 GR MWD020 API 4 1 68 44 12 PEF MWD020 BARN 4 1 68 48 13 ROP MWD020 FT/H 4 1 68 52 14 NPHI MWD020 PU-5 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7147.5 7923 7535.25 1552 7147.5 7923 CALA MWD020 INCH 8.84 12.62 10.4651 1547 7150 7923 FCNT MWD020 CNTS 569.9 3524.9 871.235 1552 7147.5 7923 NCNT MWD020 CNTS 109267 191696 129321 1552 7147.5 7923 RHOB MWD020 G/CM 1.937 2.689 2.2428 1524 7161.5 7923 DRHO MWD020 G/CM -0.045 0.252 0.0285735 1524 7161.5 7923 RPD MWD020 OHMM 2.56 43.27 9.34254 1477 7185 7923 RPM MWD020 OHMM 2.37 38.79 9.3742 1477 7185 7923 RPS MWD020 OHMM 2.39 38.94 9.08342 1477 7185 7923 RPX MWD020 OHMM 2.42 32.43 8.38832 1477 7185 7923 FET MwD020 HOUR 0.21 21.6 2.35991 1477 7185 7923 GR MWD020 API 23.38 110.94 71.2189 1462 7192.5 7923 PEF MwD020 BARN 1.28 5.54 2.30143 1524 7161.5 7923 RoP Mw~020 FT/H 7.44 312.76 141.337 1370 7238.5 7923 NPHI MwD020 PU-S 8.05 47.85 32.12 1552 7147.5 7923 First Reading For Entire File..........7147 ~ast rteading For Entire File...........7923 File Trailer Service name... .......STSLIB.003 service sub ~evel n-ame... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical Record..65535 File Ty e ................LO Next Fi~e Name...........STSLIB.004 Phy5iCd1 EOF File Header Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.003 comment rtecord FILE HEADER FILE NUMBER: 4 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 # Page 10 ~ + mps-Olall.tapx FI LE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 7923.5 7952.0 $ # LOG HEADER DATA DATE LOGGED: 02-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7952.0 TOP LOG INTERVAL (FT): 7923.0 BOTTOM LOG INTERVAL (FT): 7952.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: .O # TOOL STRING (TOP TO BOTfOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 7923.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S): 41.0 MUD PH: .0 MUD CHLORIDES ~PPM): O FLUID LOSS (C3): .O RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION tIN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame spacing ........ ............60 .1zN Max frames per record .............undefined Absent value ......................-999 Depth units. . . .. ..... Datum specification~Block sub-type...0 .0 .0 .0 .0 Page 11 ~ M i mps-Olall.tapx Name service order units size Nsam rtep Code offset channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7923.5 7952 7937.75 58 7923.5 7952 RoP MwD040 FT/H 0.42 102.39 26.7383 58 7923.5 7952 First Reading For Entire File..........7923.5 ~ast Reading For Entire File...........7952 File Trailer Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical Record..65535 File TyPe ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLIB.005 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/21 Maximum Physical Record..65535 File Type. ............~0 Previous File Name.......STSLIB.004 comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPx 7893.0 10441.0 RP5 7893.0 10441.0 FET 7893.0 10441.0 RPM 7893.0 10441.0 RPD 7893.0 10441.0 PEF 7923.5 10422.5 GR 7923.5 10434.0 DRHO 7923.5 10422.5 RHOB 7923.5 10422.5 NCNT 7923.5 10408.0 FCNT 7923.5 10408.0 NPNI 7923.5 10408.0 ROP 7952.5 10500.0 $ # Page 12 • • mps-Olall.tapx LOG HEADER DATA DATE LOGGED: 05-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10500.0 TOP LOG INTERVAL (FT): 7952.0 BOTTOM LOG INTERVAL (FT): 10500.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 67.2 MAXIMUM ANGLE: 93.7 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 153883 CTN COMP THERMAL NEUTRON 18446744073 70955 EWR4 Electromag Resis. 4 73634 ALD Azimuthal Litho-Dens 231386 ABI AT-BIT INCLINATION $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 7923.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (5): 55.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 16000 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .370 74.0 MUD AT MAX CIRCULATING TERMPERATURE: .320 87.8 MUD FILTRATE AT MT: .340 74.0 MUD CAKE AT MT: .270 74.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOO~ STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # Data Format Specification Record ~ata ttecord Type... ..........0 ~ata Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata rteference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined ,4bsent value ......................-999 ~epth units. . .. .. ..... ~atum specification Block sub-type...0 Page 13 ~ ~ mps-Olall.tapx Name service order units size Nsam Rep code Offset channel DEPT FT 4 1 68 0 1 FCNT MWD050 CNTS 4 1 68 4 2 NCNT MWD050 CNTS 4 1 68 8 3 RHOB MWD050 G/CM 4 1 68 12 4 DRHO MWD050 G/CM 4 1 68 16 5 RPD MWD050 OHMM 4 1 68 20 6 RPM MwD050 OHMM 4 1 68 24 7 RPS MWD050 OHMM 4 1 68 28 8 RPX MWD050 OHMM 4 1 68 32 9 FET MWD050 HOUR 4 1 68 36 10 GR MWD050 API 4 1 68 40 11 PEF MWD050 BARN 4 1 68 44 12 ROP MWD050 FT/H 4 1 68 48 13 NPHI MwD050 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7893 10500 9196.5 5215 7893 10500 FCNT MWD050 CNTS 108.7 1075.06 270.498 4970 7923.5 10408 NCNT MWD050 CNTS 13892.6 35800.9 20343 4970 7923.5 10408 RHOB MWD050 G/CM 1.512 2.828 2.28258 4999 7923.5 10422.5 DRHO MWD050 G/CM -0.938 0.6 0.0737247 4999 7923.5 10422.5 RPD MWD050 OHMM 0.31 2000 30.5893 5097 7893 10441 RPM MWD050 OHMM 0.23 2000 17.3429 5097 7893 10441 RPS MWD050 OHMM 0.58 546.93 13.4933 5097 7893 10441 RPx MwD050 OHMM 0.34 547.02 11.4986 5097 7893 10441 FET MwD050 HOUR 0.35 219.72 4.17943 5097 7893 10441 GR Mw~050 APZ 49.06 117.42 75.721 5022 7923.5 10434 PEF MwD050 BARN 1.3 11.82 2.26263 4999 7923.5 10422.5 ROP MwD050 FT/H 1.19 290.83 121.965 5096 7952.5 10500 NPHI Mw~050 Pu-5 11.01 65.22 34.5272 4970 7923.5 10408 First Reading For Entire File..........7893 ~ast Reading For Entire File...........10500 File Trailer Service name... .......STSLIB.005 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/21 Maximum Physical Record..65535 File TyL~ e ................LO Next File Name...........STSLIB.006 Physical EOF Tape Trailer Service name .............LISTPE Date . ...................07/09/21 Origin ...................STs Tape Name. . . ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................sTS ~IS writing ~ibrary. scientific Technical services Page 14 ~ Reel Trailer Service name .............LISTPE ~ate . ...................07/09/21 Ori 9in ...................STS Reel Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................STS LIS Physical EoF Physical EOF End Of LIS File mps-Olall.tapx writing ~ibrary. ~ scientific Technical services Page 15 ~ ~ ! Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Jul 25 16:19:22 2007 Reel Header Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Reel Name ................UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................STS LIS Writing Library. Tape Header Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................STS LIS Writing Library • Scientific Technical Services Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: MPS-OlA ~- ~ API NUMBER: 500292314101 OPERATOR: BP Exploration LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 25-JUL-07 # JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 4 JOB NUMBER: MW0005043233 MW0005043233 MW0005043233 LOGGING ENGINEER: J. BOBBITT J. BOBBITT. A. MUNRO OPERATOR WITNESS: E. VAUGHN G. BURLY J. HABERTHUR MWD RUN 5 JOB NUMBER: MW0005043233 LOGGING ENGINEER: A. MUNRO OPERATOR WITNESS: J. HABERTHUR # SURFACE LOCATION SECTION: 7 TOWNSHIP: 12N RANGE: 11E FNL: FSL: 3375 FEL: 4714 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 72.04 GROUND LEVEL: 38.30 # WELL CASING RECORD OPEN HOLE CASING DRILLERS acs~--a3~1 # r s3e~s . ~ ~ ~ BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.875 10.750 3140.0 2ND STRING 6.750 7.625 7923.0 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A WHIPSTOCK, THE TOP OF WHICH WAS AT 7923'MD/4300'TVD IN THE MPS-OlA PBl WELLBORE. THE WHIPSTOCK WAS POSITIONED, THE WINDOW WAS MILLED, AND ABOUT 20' OF RAT HOLE WERE DRILLED DURING MWD RUN 4. ONLY SROP DATA ARE PRESENTED FOR THIS RUN. 4. MWD RUNS 1,2,5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO-DENSITY (ALD), AND PRESSURE WHILE DRILLING (PWD). ROTATED ALD DATA OVER SLIDE INTERVALS BELOW ABOUT 6450'MD WERE ACQUIRED AFTER DRILLING THE INTERVALS. THESE MAD DATA WERE MERGED WITH THE MWD DATA. MWD RUNS 1,2 ALSO INCLUDED ACOUSTIC CALIPER (ACAL). MWD RUN 5 INCLUDED AT-BIT INCLINATION (ABI). 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO THE SPERRY DRILLING SERVICES MWD GAMMA RAY LOG FROM MPS-O1. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY D. DORTCH (SAIC/BP) ON 8 JUNE 2007, QUOTING AUTHORIZATION FROM MIKIE WEEKS (BP GEOSCIENTIST). THE SHIFTED GAMMA RAY LOG IS CONSIDERED PDC FOR MPS-OlA. 6. MWD RUNS 1,2,4,5 REPRESENT WELL MPS-OlA WITH API#: 50-029-23141-O1. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10500'MD/4402'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, ACAL-DERIVED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. ~ ~ CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZES: ACAL-DERIVED (BIT SIZE 9.875") MUD WEIGHT: 8.8 - 9.5 PPG MUD SALINITY: 1000 PPM CHLORIDES FORMATION WATER SALINITY: 21000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2808.0 10430.0 PEF 3126.5 10418.5 RPX 3126.5 10437.0 FCNT 3126.5 10404.0 RPS 3126.5 10437.0 NCNT 3126.5 10404.0 DRHO 3126.5 10418.5 RHOB 3126.5 10418.5 RPM 3126.5 10437.0 RPD 3126.5 10437.0 NPHI 3126.5 10404.0 FET 3137.0 10437.0 ROP 3141.5 10496.0 CALA 3152.0 7919.0 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 2808.0 2800.5 2809.5 2802.0 2812.5 2804.5 2819.5 2815.0 2827.5 2819.5 2832.5 2829.5 2840.5 2834.5 2843.0 2838.0 2848.0 2841.0 • 2853.5 2847.0 2885.5 2882.5 2897.0 2896.0 2911.5 2907.5 2930.0 2926.5 2967.5 2965.0 3008.0 3007.0 3020.5 3019.0 3026.5 3024.5 3032.5 3031.5 3067.0 3064.0 3073.0 3070.5 3077.5 3075.0 3089.0 3086.5 3092.0 3091.0 3109.5 3106.0 3117.5 3118.5 3128.0 3133.0 3141.0 3144.5 3146.0 3150.0 8386.0 8390.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 1 2800.5 MWD 2 7238.0 MWD 4 7923.5 MWD 5 7952.0 $ # REMARKS: MERGED MAIN PASS. $ MERGE BASE 7238.0 7923.0 7952.0 10500.0 # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order DEPT CALA MWD FCNT MWD NCNT MWD RHOB MWD DRHO MWD RPD MWD RPM MWD RPS MWD RPX MWD FET MWD GR MWD PEF MWD ROP MWD NPHI MWD Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 INCH 4 1 68 4 2 CNTS 4 1 68 8 3 CNTS 4 1 68 12 4 G/CM 4 1 68 16 5 G/CM 4 1 68 20 6 OHMM 4 1 68 24 7 OHMM 4 1 68 28 8 OHMM 4 1 68 32 9 OHMM 4 1 68 36 10 HOUR 4 1 68 40 11 API 4 1 68 44 12 BARN 4 1 68 48 13 FT/H 4 1 68 52 14 PU-S 4 1 68 56 15 ~ First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2808 10496 6652 15377 2808 10496 ~ ~ CALA MWD INCH 8.8 12.84 10.3522 9535 3152 7919 FCNT MWD CNTS 108.7 3524.9 599.621 14556 3126.5 10404 NCNT MWD CNTS 13892.6 191696 88622 14556 3126.5 10404 RHOB MWD G/CM 1.042 2.861 2.16054 14585 3126.5 10418.5 DRHO MWD G/CM -2.586 0.6 0.042779 14585 3126.5 10418.5 RPD MWD OHMM 0.31 2000 15.4728 14622 3126.5 10437 RPM MWD OHMM 0.23 2000 14.1892 14622 3126.5 10437 RPS MWD OHMM 0.58 2000 14.1007 14622 3126.5 10437 RPX MWD OHMM 0.34 547.02 12.0047 14622 3126.5 10437 FET MWD HOUR 0.18 213.73 1.14113 14601 3137 10437 GR MWD API 6.1 120.68 67.5171 15245 2808 10430 PEF MWD BARN 0.38 12.31 2.22275 14585 3126.5 10418.5 ROP MWD FT/H 0.08 429.63 175.305 14710 3141.5 10496 NPHI MWD PU-S 8.05 98.59 35.5122 14556 3126.5 10404 First Reading For Entire File..........2808 Last Reading For Entire File...........10496 File Trailer Service name .............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 2800.5 7192.0 NPHI 3130.5 7147.0 RPD 3130.5 7184.5 FCNT 3130.5 7147.0 NCNT 3130.5 7147.0 RPX 3130.5 7184.5 RPM 3130.5 7184.5 RPS 3130.5 7184.5 PEF 3131.0 7161.0 RHOB 3131.0 7161.0 DRHO 3131.0 7161.0 FET 3141.0 7184.5 ROP 3145.0 7238.0 CALA 3156.0 7149.5 $ # ~ ~ LOG HEADER DATA DATE LOGGED: 23-MAY-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7238.0 TOP LOG INTERVAL (FT): 3145.0 BOTTOM LOG INTERVAL (FT): 7238.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 63.2 MAXIMUM ANGLE: 70.5 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RESIS. 4 230203 CTN COMP THERMAL NEUTRON 174114 ALD Azimuthal Litho-Dens 224807 ACAL Acoustic Caliper $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASING DEPTH (FT): 3140.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.15 MUD VISCOSITY (S): 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 800 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 4.400 72.0 MUD AT MAX CIRCULATING TERMPERATURE: 3.350 96.8 MUD FILTRATE AT MT: 3.400 72.0 MUD CAKE AT MT: 4.600 72.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWDO10 INCH 4 1 68 4 2 FCNT MWDO10 CNTS 4 1 68 8 3 NCNT MWDO10 CNTS 4 1 68 12 4 ~ ~ RHOB MWDO10 G/CM 4 1 68 16 5 DRHO MWDO10 G/CM 4 1 68 20 6 RPD MWDO10 OHMM 4 1 68 24 7 RPM MWDO10 OHMM 4 1 68 28 8 RPS MWDO10 OHMM 4 1 68 32 9 RPX MWDO10 OHMM 4 1 68 36 10 FET MWDO10 HOUR 4 1 68 40 11 GR MWDO10 API 4 1 68 44 12 PEF MWDO10 BARN 4 1 68 48 13 ROP MWDO10 FT/H 4 1 68 52 14 NPHI MWDO10 PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2800.5 7238 5019.25 8876 2800.5 7238 CALA MWDO10 INCH 8.8 12.84 10.3304 7988 3156 7149.5 FCNT MWDO10 CNTS 401.82 1493.67 750.779 8034 3130.5 7147 NCNT MWDO10 CNTS 98857 150932 123001 8034 3130.5 7147 RHOB MWDO10 G/CM 1.042 2.861 2.06934 8061 3131 7161 DRHO MWDO10 G/CM -2.586 0.297 0.026266 8061 3131 7161 RPD MWDO10 OHMM 0.54 2000 16.3152 8109 3130.5 7184.5 RPM MWDO10 OHMM 0.41 2000 14.9887 8109 3130.5 7184.5 RPS MWDO10 OHMM 0.86 2000 15.2242 8109 3130.5 7184.5 RPX MWDO10 OHMM 0.85 146.18 12.9006 8109 3130.5 7184.5 FET MWD010 HOUR 0.18 7.62 0.649048 8088 3141 7184.5 GR MWDO10 API 6.1 120.68 62.124 8784 2800.5 7192 PEF MWDO10 BARN 0.38 12.31 2.18354 8061 3131 7161 ROP MWDO10 FT/H 0.08 429.63 215.224 8187 3145 7238 NPHI MWDO10 PU-S 15.96 98.59 36.7713 8034 3130.5 7147 First Reading For Entire File..........2800.5 Last Reading For Entire File...........7238 File Trailer Service name .............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 # FILE SUMMARY for each bit run in separate files. ~ LJ VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 7147.5 7923.0 FCNT 7147.5 7923.0 NCNT 7147.5 7923.0 CALA 7150.0 7923.0 DRHO 7161.5 7923.0 PEF 7161.5 7923.0 RHOB 7161.5 7923.0 FET 7185.0 7923.0 RPM 7185.0 7923.0 RPD 7185.0 7923.0 RPX 7185.0 7923.0 RPS 7185.0 7923.0 GR 7192.5 7923.0 ROP 7238.5 7923.0 $ # LO G HEADER DATA DATE LOGGED: 25-MAY-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7923.0 TOP LOG INTERVAL (FT): 7238.0 BOTTOM LOG INTERVAL (FT): 7923.0 BIT ROTATING SPEE D (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 62.3 MAXIMUM ANGLE: 67.2 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 10718517 EWR4 ELECTROMAG. RESIS. 4 230203 CTN COMP THERMAL NEUTRON 174114 ALD Azimuthal Li tho-Dens 224807 ACAL Acoustic Cal iper $ # BOREHOLE AND CASI NG DATA OPEN HOLE BIT SIZE (IN): 9.875 DRILLER'S CASI NG DEPTH (FT): 3140.0 # BOREHOLE CONDITIONS ~ MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G) : 9.50 MUD VISCOSITY (S): .0 MUD PH: 8.0 MUD CHLORIDES (PPM): 600 FLUID LOSS (C3): 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 4.600 72.0 MUD AT MAX CIRCULATING TERMPERATURE: 3.270 104.0 MUD FILTRATE AT MT: 6.000 72.0 MUD CAKE AT MT: 5.000 72.0 # # # # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ i ~ Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 CALA MWD020 INCH 4 1 68 4 2 FCNT MWD020 CNTS 4 1 68 8 3 NCNT MWD020 CNTS 4 1 68 12 4 RHOB MWD020 G/CM 4 1 68 16 5 DRHO MWD020 G/CM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 RPM MWD020 OHMM 4 1 68 28 8 RPS MWD020 OHMM 4 1 68 32 9 RPX MWD020 OHMM 4 1 68 36 10 FET MWD020 HOUR 4 1 68 40 11 GR MWD020 API 4 1 68 44 12 PEF MWD020 BARN 4 1 68 48 13 ROP MWD020 FT/H 4 1 68 52 14 NPHI MWD020 PU-S 4 1 68 56 15 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7147.5 7923 7535.25 1552 7147.5 7923 CALA MWD020 INCH 8.84 12.62 10.4651 1547 7150 7923 FCNT MWD020 CNTS 569.9 3 524.9 871.235 1552 7147.5 7923 NCNT MWD020 CNTS 109267 1 91696 129321 1552 7147.5 7923 RHOB MWD020 G/CM 1.937 2.689 2.2428 1524 7161.5 7923 DRHO MWD020 G/CM -0.045 0.252 0.0285735 1524 7161.5 7923 RPD MWD020 OHMM 2.56 43.27 9.34254 1477 7185 7923 RPM MWD020 OHMM 2.37 38.79 9.3742 1477 7185 7923 RPS MWD020 OHMM 2.39 38.94 9.08342 1477 7185 7923 RPX MWD020 OHMM 2.42 32.43 8.38832 1477 7185 7923 FET MWD020 HOUR 0.21 21.6 2.35991 1477 7185 7923 GR MWD020 API 23.38 1 10.94 71.2189 1462 7192.5 7923 PEF MWD020 BARN 1.28 5.54 2.30143 1524 7161.5 7923 ROP MWD020 FT/H 7.44 3 12.76 141.337 1370 7238.5 7923 NPHI MWD020 PU-S 8.05 47.85 32.12 1552 7147.5 7923 First Reading For Entire File..........7147 Last Reading For Entire File...........7923 File Trailer Service name .............STSLIB.003 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header . , ~ ~ Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 7923.5 7952.0 $ # LOG HEADER DATA DATE LOGGED: 02-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 7952.0 TOP LOG INTERVAL (FT): 7923.0 BOTTOM LOG INTERVAL (FT): 7952.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMLTM ANGLE : . 0 MAXIML7M ANGLE : . 0 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 7923.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S): 41.0 MUD PH: .0 MUD CHLORIDES (PPM): 0 FLUID LOSS (C3): •~ RESISTIVITY (OHMM) AT TEMPER.ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record 0 0 0 0 . , ~ ~ Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7923.5 7952 7937.75 58 7923.5 7952 ROP MWD040 FT/H 0.42 102.39 26.7383 58 7923.5 7952 First Reading For Entire File..........7923.5 Last Reading For Entire File...........7952 File Trailer Service name .............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH RPX 7893.0 10441.0 RPS 7893.0 10441.0 FET 7893.0 10441.0 RPM 7893.0 10441.0 RPD 7893.0 10441.0 PEF 7923.5 10422.5 GR 7923.5 10434.0 DRHO 7923.5 10422.5 RHOB 7923.5 10422.5 • ~ NCNT 7923.5 10408.0 FCNT 7923.5 10408.0 NPHI 7923.5 10408.0 ROP 7952.5 10500.0 $ # LOG HEADER DATA DATE LOGGED: 05-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10500.0 TOP LOG INTERVAL (FT): 7952.0 BOTTOM LOG INTERVAL (FT): 10500.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 67.2 MAXIMLTM ANGLE: 93.7 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 153883 CTN COMP THERMAL NEUTRON 18446744073 70955 EWR4 Electromag Resis. 4 73634 ALD Azimuthal Litho-Dens 231386 ABI AT-BIT INCLINATION $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.750 DRILLER'S CASING DEPTH (FT): 7923.0 # BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB/G): 9.30 MUD VISCOSITY (S): 55.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 16000 FLUID LOSS (C3): .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .370 74.0 MUD AT MAX CIRCULATING TERMPERATURE: .320 87.8 MUD FILTRATE AT MT: .340 74.0 MUD CAKE AT MT: .270 74.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type ..................0 Data Specification Block Type.....0 Logging Direction .................Down Optical log depth units...........Feet Data Reference Point ..............Undefined Frame Spacing .....................60 .lIN Max frames per record .............Undefined Absent value ......................-999 Depth Units ....................... Datum Specification Block sub-type...0 . ~ Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD050 CNTS 4 1 68 4 2 NCNT MWD050 CNTS 4 1 68 8 3 RHOB MWD050 G/CM 4 1 68 12 4 DRHO MWD050 G/CM 4 1 68 16 5 RPD MWD050 OHMM 4 1 68 20 6 RPM MWD050 OHMM 4 1 68 24 7 RPS MWD050 OHMM 4 1 68 28 8 RPX MWD050 OHMM 4 1 68 32 9 FET MWDO50 HOUR 4 1 68 36 10 GR MWD050 API 4 1 68 40 11 PEF MWD050 BARN 4 1 68 44 12 ROP MWD050 FT/H 4 1 68 48 13 NPHI MWD050 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7893 10500 9196.5 5215 7893 10500 FCNT MWD050 CNTS 108.7 1075.06 270.498 4970 7923.5 10408 NCNT MWD050 CNTS 13892.6 35800.9 20343 4970 7923.5 10408 RHOB MWD050 G/CM 1.512 2.828 2.28258 4999 7923.5 10422.5 DRHO MWD050 G/CM -0.938 0.6 0.0737247 4999 7923.5 10422.5 RPD MWD050 OHMM 0.31 2000 30.5893 5097 7893 10441 RPM MWD050 OHMM 0.23 2000 17.3429 5097 7893 10441 RPS MWD050 OHMM 0.58 546.93 13.4933 5097 7893 10441 RPX MWD050 OHMM 0.34 547.02 11.4986 5097 7893 10441 FET MWD050 HOUR 0.35 219.72 4.17943 5097 7893 10441 GR MWD050 API 49.06 117.42 75.721 5022 7923.5 10434 PEF MWD050 BARN 1.3 11.82 2.26263 4999 7923.5 10422.5 ROP MWD050 FT/H 1.19 290.83 121.965 5096 7952.5 10500 NPHI MWD050 PU-S 11.01 65.22 34.5272 4970 7923.5 10408 First Reading For Entire File..........7893 Last Reading For Entire File...........10500 File Trailer Service name .............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......07/07/25 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.006 Physical EOF Tape Trailer Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Tape Name ................UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Scientific Technical Services Service name .............LISTPE Date .....................07/07/25 Origin ...................STS Reel Name ................UNKNOWN Continuation Number..... Next Reel Name.......... Comments ................ Physical EOF Physical EOF • Ol • UNKNOWN STS LIS Writing Library. Scientific Technical Services End Of LIS File