Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-013Pr•o'ect Well Histo File Cov~er Pa e Image ~ ~"y J XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~, ~~_~ 13 Well History File Idenfiifier Organizing (done) RES AN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: BY: Maria _. Project Proo~ng BY: ~ Two-sided ~II II'III Ill~f III~I DIG TAL DATA Diskettes, No. ~ ^ Other, No/Type: Date: Date: ^ Rescan Needed ~~I II~I II I) ll ~l) lll OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ (II II'III~IIII IIIII /s/ ~ l ~ Scannin Pre aration _~ x 30 =~+~= TOTAL PAGES~_ g P ~/~~/~ (Count does not inGude cover sheet) ~/~ /~ BY: ~ Mana~ Date: ~S~ V Y I' Production Scanning Stage 1 BY: Stage 1 Page Count from Scanned File: -l~-,~-- (Count does include cov heet) Page Count Matches Number in Scanning Preparation: YES NO Maria Date: ~ ~7/Q ~~ ~ ~ / ~ q If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Scanning is complete at this point unless rescanning is required. /s/ III II'lll IIIII II III ReScanned III IIIII) I~I~ II ~I~ BY: Maria Date: ~S~ Qualit Checked IIIIIIIIIIIIII'llll Comments about this fiie: Y 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION 111-'l 3 1 2013 WELL COMPLETION OR RECOMPLETION REPORT ANNNNNNN r, la. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1b. Well 20AAC 25.105. 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions Zero • 0 Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 10/5/20131 207-013 313-397 • 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 6/11/2007 • 50-029-20403-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 6/18/2007 PBU F-09B 2467'FNL,2405'FWL, Sec.02,T11 N, R13E, UM 8. KB(ft above MSL): 64.99' 15.Field/Pool(s) Top of Productive Horizon: 4407 FNL, 751'FEL, Sec.03,T11 N, R13E, UM GL(ft above MSL): 36.49' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) Oil Pool 4272' FNL,2644'FEL, Sec.03,T11 N, R13E, UM 10848' 9018' • 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 651958 y- 5974332 Zone- ASP4 12040' • 9046' ADL 028280&028281 TPI: x- 648845 y- 5972330 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 646949 y- 5972428 Zone- ASP4 None 18. Directional Survey: ❑Yes ®No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: DIR/GR/RES, NEU/DEN, RES/GR • 9498' 8528' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 7.9 cu vds Permafrost 13-3/8" 72# L-80 Surface 2700' Surface 2699' 17-1/2" 4269 cu ft Artic Set 9-5/8" 47# L-80 2030' 9390' 2030' 8427' 12-1/4" 1230 cu ft Class'G', 130 cu ft AS 7" 29# L-80 8899' 9498' 7993' 8528' 8-1/2" 391 cu ft Class'G' 4-1/2" 12.6# L-80 9328' 11350' 8369' 9024' 6-1/8" 350 cu ft Class'G' 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) II 4-1/2", 12.6#, 13Cr80 9334' 9235'/8285' I-0� 1 ' `. 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. VC!`. WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes 0 No DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 10848' Set Whipstock -9991 -26 Bbls Class'G' SCANNED MAY 9 201 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDME MAR 2 0 201& Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only / Vel 4/2 3/14 ,�R` /� /r '7� .zv_. 6 V 29. GEOLOGIC MARKERS(List all formations an' -kers encounter 30. FORMATION TESTS NAME ....j ND Well Tested? ,J Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sag River 9490' 8520' None Shublik 9530' 8557' Sadlerochit 9606' 8625' 42N 9703' 8705' CGL 9777' 8759' Base of CGL 9862' 8822' 25N 9952' 8890' 21N 10126' 8995' 14N 10388' 9039' 14N (Invert) 10542' 9033' 14N (Revert) 11193' 9021' 14P 11817' 9030' Formation at Total Depth: 31.List of Attachment: Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Matt Ross,564-5782 Email: Rossmo@bp.com Printed:::ture:J0e : Lastu Title: Drilling Technologist - r r ` Phone 564-4091 Date: Lo/51 11 t 3 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only F-09B, Well History (Pre Rig Sidetrack) Date Summary 08/12/13 CTU 8 w/1.75"CT. Scope; Mill XN, CIBP, Drift. Start Rig up. 08/13/13 CTU 8 w/1.75"CT. Scope; Mill XN, CIBP, Drift. Finish rig up.function test BOP's. RIH w/BHA; 3.08"ctc, 3.13"dfcv, 3.16"jars, 3.38"disco, 3.13"circ sub, 3.15"motor, 3.79"string reimer, 3.8"mill (oal=25.43').., Mill thru xn nip @ 9321'md. Pooh. (Mill and string reamer gauge is 3.77") RIH with 3 bladed 3.77"junk mill to 10546, mill and push CIBP to top of WRP at 10884,flag pipe at 10854. pooh. MU BHA; 3.08"ctc, 3.13"dfcv, 3.16"jar,3.38"disco,two 3.62"WS drift sections, 3.7"WS drift(oal=31.1'). 08/14/13 CTU 8 w/1.75"CT. Scope; Mill XN, CIBP, drift w/dummy whipstock. RIH w/BHA; 3.08"ctc, 3.13"dfcv, 3.16"jar, 3.38"disco,two 3.62"WS drift sections, 3.7"WS drift(oal=31.1')Sat down at 10848'. Pump down coil and push milled plug to top of WRP at 10900'CTM. Make several passes from 10820 to 10900 without problems. Pooh. Freeze protect well with 38 bbls of 50/50 meth. 08/15/13 T/I/O=SSV/110/10.Temp=SI.WHPs(Pre OA valve c/o). No AL. SV,WV, SSV=C. MV=0. IA, OA= OTG. NOVP. 2120. 08/29/13 T/I/0=Vac/30/4.Temp=SI.Tubing FL. (Valve shop request). No wellhouse or flowline.Tubing FL @ 1080'(17 bbls). SV,WV, SSV=C. MV=0. IA&OA=OTG. 20:40. 08/29/13 T/I/0= 10/0/0 ,Torque all tree flanges above MV PRE CTD. PT"D SV Fail. See log for details. 08/29/13 T/I/0=10/0/10. Conduct PJSM. Barriers= MV, SV,SSV and OA valve LTT. Set TWC, Replace Swab valve, install OA piggyback, Pull TWC. 08/30/13 T/I/0=0/0/0; Set BPV; Replace SSV bonnet packing cardridge;Test tree; Pull BPV; Set TWC,Torqeud MV x THA Flange to spec.,test MV flange and THA; Pull TWC. Page 1 of 1 North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/29/2013 00:00 - 00:30 0.50 MOB P PRE HOLD PJSM. BACK RIG OFF WELL.SPOT ON DS02 TO WAIT FOR RIG MOVE. • 00:30 - 00:00 23.50 MOB N WAIT PRE STANDBY ON DS 5 FOR RIG MOVE. WORK ON SEVERAL RIG PROJECTS. 9/30/2013 00:00 - 06:00 6.00 MOB N WAIT PRE STANDBY ON DS 5 FOR RIG MOVE. WORK ON SEVERAL RIG PROJECTS. 06:00 - 06:30 0.50 MOB N WAIT PRE CREW CHANGE. DISCUSS RIG EQUIPMENT AND PROJECT STATUS. 06:30 - 18:00 11.50 MOB N WAIT PRE CONTINUE TO STAND BY ON DS 5 FOR PARKER 272 RIG MOVE. CONTINUE PROJECTS ON RIG. 18:00 - 18:30 0.50 MOB N WAIT PRE CREW CHANGE. DISCUSS RIG EQUIPMENT AND PROJECT STATUS. 18:30 - 00:00 5.50 MOB N WAIT PRE CONTINUE TO STAND BY ON DS 5 FOR PARKER 272 RIG MOVE. CONTINUE PROJECTS ON RIG. 10/1/2013 00:00 - 06:00 6.00 MOB N WAIT PRE STANDBY ON DS 5 FOR RIG MOVE. WORK ON SEVERAL RIG PROJECTS. 06:00 - 06:30 0.50 MOB N WAIT PRE CREW CHANGE. DISCUSS RIG EQUIPMENT AND PROJECT STATUS. 06:30 - 18:00 11.50 MOB N WAIT PRE CONTINUE TO STANDBY FOR RIG MOVE TO F PAD. WORK ON SEVERAL RIG MAINTENANCE PROJECTS. 18:00 - 18:30 0.50 MOB N WAIT PRE CREW CHANGE. DISCUSS RIG EQUIPMENT AND PROJECT STATUS. 18:30 - 00:00 5.50 MOB N WAIT PRE CONTINUE TO STANDBY FOR RIG MOVE TO F PAD. WORK ON SEVERAL RIG MAINTENANCE PROJECTS. 10/2/2013 00:00 - 03:30 3.50 MOB N WAIT PRE CONTINUE TO STANDBY FOR RIG MOVE TO F PAD. WORK ON SEVERAL RIG MAINTENANCE PROJECTS. 03:30 - 06:00 2.50 MOB P PRE HELD PJSM WITH RIG CREW FOR RIG MOVE. WARMED UP HYDRAULIC SYSTEM/ROLLED TIRES. PERFORM FINAL INSPECTIONS BEFORE BEGINNING RIG MOVE. MOVE FROM DS 5 TO PAD 10. 06:00 - 07:00 1.00 MOB P PRE CREW CHANGE.RIG MOVE. PULL RIG OFF THE ROAD ON TO PAD 10 FOR CREW CHANGE AND TO RESTORE NORMAL TRAFFIC PATTERN. TOOL PUSHER MAKE ROUTE DRIVE FROM PAD 10 TO F PAD PRIOR TO MOVE. HOLD PRE MOVE PJSM WITH CREW AT PAD 10. 07:00 - 12:00 5.00 MOB P PRE RIG MOVE. MOVE RIG ALONG WEST DOCK ROAD FROM PAD 10. PASS OXBOW TURN-OFF AT 08:30 HRS TURN ONTO K-PAD RODE AT 12:00 NOON AVERAGE 1.5 MPH REMOVE MATS FROM DS 5 ACCESS ROAD. Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 MOB P PRE RIG MOVE. MOVE RIG ALONG K-PAD ROAD ARRIVE AT TWIN-TOWERS/SPINE ROAD INTERSECTION AT 16:30 HRS TURN ON TO SPINE ROAD AND STOP AT SANTA FE PAD. HELD PRE SPUD MEETING WITH NIGHT CREW. 18:00 - 19:30 1.50 MOB P PRE RIG MOVE.CREW CHANGE. PULL RIG OFF THE ROAD AT SANTA FE PAD FOR CREW CHANGE AND TO RESTORE 'NORMAL TRAFFIC PATTERN. LAY MATS AROUND FRONTIER CORNER. 19:30 - 21:00 1.50 MOB P PRE MOVE DOWN SPINE ROAD FROM SANTA FE PAD TO F PAD ACCESS ROAD. TURN ONTO F ACCESS ROAD/MOVE DOWN TO LOCATION. PARK RIG ON LOCATION. 21:00 - 23:00 2.00 MOB P PRE SET RIG MATS AROUND WELL.CHECK PRESSURES ON IA/OA-100/0. NOTIFIED DHD,WAIT ON PRESSURE TO BE BLED DOWN BEFORE PULLING OVER WELL. IA PRESSURE BLED DOWN FROM 75 PSI TO 0 PSI.WAIT 30 MINS. RE-CHECKED PRESSURE 16 PSI,BLED DOWN TO 0 PSI. RD DHD,PREPARE TO PULL OVER WELL. 23:00 - 00:00 1.00 MOB P PRE HELD PJSM WITH CREW FOR PULLING OVER WELL. PULL OVER WELL F-09C WITH WSL,NORDIC SUPERINTENDENT NORDIC TOOL PUSHER PRESENT 10/3/2013 00:00 - 02:00 2.00 BOPSUR P WEXIT ACCEPT RIG AT 00:00 ON 10/03/2013. SPOT ANCILLARY EQUIPMENT.LEAK TIGHT TEST OF SWAB&MASTER, NIPPLE DOWN TREE CAP. 02:00 - 02:30 0.50 BOPSUR P WEXIT HELD PJSM FOR RAISING REEL INTO REEL HOUSE. 02:30 - 06:00 3.50 BOPSUR P WEXIT RAISE COIL INTO REEL HOUSE AND SECURE SAME. NU BOP.SPOT TIGER TANK AND TEST HARD LINE. SPOT CUTTING BOX,RU SAME. 06:00 - 07:00 1.00 BOPSUR P WEXIT HELD PJSM FOR PULLING COIL ACROSS PIPE SHED TO RIG FLOOR. RIG UP GRAPPLE AND TEST PULL. RIG DOWN SHIPPING BAR. PULL COIL ACROSS FROM REEL HOUSE TO RIG FLOOR. 07:00 - 09:00 2.00 BOPSUR P WEXIT RIG UP INJECTOR HEAD STAB COIL INTO INJECTOR HEAD GOOSE NECK TERMINATE(BOOT)END OF E-LINE STAND INJECTOR BACK OVER CIRCULATING HOLE. CHANGE PACK-OFF ON INJECTOR Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:00 2.00 BOPSUR P WEXIT TEST BOP INSTALL TEST PLUG IN TEST SPOOL. FILL BOP WITH FRESH WATER. SHELL TEST BOP.BLEED AIR FROM SYSTEM THE SATELLITE OFFICE LOCATION WAS AGREED UPON WITH THE PAD OPERATOR PRIOR TO MOVING ON TO THE LOCATION. 11:00 - 11:30 0.50 BOPSUR P WEXIT RIG EVACUATION DRILL. SOUND GENERAL ALARM AND MAKE ANOUNCEMENT OVER RIG INTERCOM AND HARMONY GOOD RESPONSE FROM CREWAND THIRD PARTY CONTRACTORS ON LOCATION. PAD OPERATOR AND WELL TEST CREW ON THE PAD WERE ADVISED OF THE DRILL. AFTER ACTION REVIEW REVEALED THAT RADIO ANOUNCEMENT WAS HEARD BY TRUCK DRIVER BUT NOT THE SIREN. 11:30 - 18:30 7.00 BOPSUR P WEXIT TEST BOP. PJSM. TEST BOP TO 250/3500 PSI FOR 5 CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL NCR, INSIDE MANUAL VALVES ON CHOKE AND KILL LINE,BOP RAMS AND ANNULAR PREVENTER. VBR AND ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2" TEST 2 FULL OPENING SAFETY VALVES FUNCTION BOP FROM BOTH REMOTE PANELS TEST WITNESSED BY TOOLPUSHER AND WSL. TEST GAS ALARMS AND DRAW DOWN TEST OF ACCUMULATOR. BOP TEST WITNESSED BY BOB NOBLE FROM THE AOGCC. PUMP 5 BBL METHANOL INTO COIL.FILL COIL WITH 57 BBL 1%KCL. 18:30 - 19:00 0.50 BOPSUR P WEXIT HELD PJSM FOR CUTTING COIL. 19:00 - 22:00 3.00 BOPSUR P WEXIT CUT 250'FT.OF COIL.INSTALL SLB COIL CONNECTOR. PULL/PRESSURE TEST-35K/250-4000 PASSED. PUMP SLACK OUT OF REEL. 22:00 - 22:30 0.50 BOPSUR P WEXIT RIG EVAC DRILL WITH CREW.EVERYONE ON LOCATION MUSTERED IN THE PROPER LOCATION.HELD AAR,NO DEFICIENCIES IN DRILL. GOOD RESPONSE FROM ALL CH2 TRUCK DRIVERS. 22:30 - 00:00 1.50 BOPSUR P WEXIT MEG TEST E-LINE,GOOD TEST. HEAD UP BHI.PRESSURE TEST 250/3500 PSI 10/4/2013 00:00 - 00:45 0.75 BOPSUR P WEXIT REMOVING ACCUMULATED ICE FROM DERRICK. 00:45 - 02:00 1.25 BOPSUR P WEXIT PSJM ON RU LUBRICATOR.RU LUBRICATOR &TEST SAME. 250/3500-PASSED.PULLED BPV WITH LUBRICATOR. WELL ON A VACUUM.CLOSED MASTER& SSV. Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:OOAM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 02:30 0.50 BOPSUR P WEXIT RD LUBRICATOR. 02:30 - 05:00 2.50 BOPSUR P WEXIT PRESSURE TEST:BAKER CHECKS 250/3500- PASSED. PRESSURE TEST:QTS AND PACK-OFF- 250/3500-PASSED. PRESSURE TEST:BAKER COIL CONNECTION -250/3500-PASSED. 05:00 - 05:45 0.75 BOPSUR P WEXIT FILL COIL WITH MUD DISPLACE COIL FROM 8.3 PPG KCL TO 9.5 'PPG POWERPRO MUD. PRESSURE TEST RISER CAP-250/3500- PASSED. 05:45 - 07:15 1.50 KILLW P WEXIT KILL WELL BULLHEAD 197 BBL 8.3 PPG 1%KCL AT 5.0 BPM WITH FINAL PRESSURE OF 2153 PSI. BULLHEAD 165 BBL 9.5 PPG POWERPRO DRILLING FLUID AT 4.7 BPM WITH FINAL PRESSURE OF 1240 PSI. 07:15 - 08:00 0.75 KILLW P WEXIT FLOW CHECK WELL OBSERVE WELL FOR 10 MINUTES ON A VACUUM,GRADUALLY SLOWING DOWN FILL WELL THROUGH THE KILL LINE WITH 7 BBL MUD. FLOW CHECK WELL FOR 15 MINUTES ON A SLOW VACUUM FILL WELL THROUGH THE KILL LINE FOR 15 MINUTES. THE WELL IS LOOSING MUD AT 15 BPM. 08:00 - 08:15 0.25 STWHIP P WEXIT PJSM HOLD PJSM TO COVER PICK UP WHIPSTOCK SETTING BHA. IN ATTENDANCE:DRILLER AND CREW,SLB COIL OPERATOR,BAKER TT REP,BAKER DD AND MWD AND WSL. 08:15 - 08:45 0.50 STWHIP P WEXIT PICK UP BHA PICKUP BAKER TT"45KB"PACKER WHIPSTOCK AND SETTING BHA. PACKER,WHIPSTOCK SETTING SLEEVE AND HYDRAULIC SETTING TOOL. THE BULL NOSE OF THE PACKER IS BORED OUT WITH A 1/4"HOLE AND WILL NOT SEAL. 08:45 - 09:00 0.25 STWHIP P WEXIT PICK UP INJECTOR HEAD PICK UP INJECTOR HEAD. MAKE UP COIL CONNECTOR TO UQC ON BHA. MAKE UP QTS AND TEST TO 300/3500 PSI FOR 5 MINUTES. 09:00 - 11:30 2.50 STWHIP P WEXIT RIH RIH WITH WHIPSTOCK AND SETTING TOOL AT 70 FPM PUMPING AT.75 BPM WITH 1285 PSI. OPEN EDC WHILE RIH. 11:30 - 12:00 0.50 STWHIP P WEXIT RUN THE TIE-IN LOG AT 9490'AS DIRECTED BY GEO. CORRECTION-19.5' 12:00 - 15:45 3.75 STWHIP P WEXIT LOG CCL. RIH WITH CCL FROM 9900'TO 10,880' POH WITH CCL FROM 10,000'TO 9000'TO CONFIRM TOP OF 4-1/2"LINER. TOP OF 4-1/2"LINER AT 9327' Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:45 - 16:00 0.25 STWHIP P WEXIT SET WHIPSTOCK CONFIRM UP WEIGHT 45 K AND DOWN WEIGHT 23 K CLOSE EDC ORIENT WHIPSTOCK TO 90°LOHS INCREASE PUMP RATE AND PRESSURE TO SET AND RELEASE WHIPSTOCK. TOOL SET AND RELEASED AT 3000 PSI. SET DOWN 5 K TO CONFIRM WHIPSTOCK SET.PICK UP FREE. 16:00 - 18:00 2.00 STWHIP P WEXIT POH WHIPSTOCK. POH WITH WHIPSTOCK SETTING TOOL AT 94 FPM CIRCULATE AT 1.5 BPM WITH 1315 PSI MUD LOSS TO THE WELL 15 BPH. 18:00 - 18:30 0.50 STWHIP P WEXIT CREW CHANGE.PERFORM VISUAL WALK AROUND INSPECTIONS. INSPECT TOOLS AND EQUIPMENT.REVIEW JSEA FOR LD BHA. 18:30 - 19:00 0.50 STWHIP N HMAN 10,845.00 WEXIT BEGIN LAYING DOWN WHIPSTOCK RUNNING ASSEMBLY BLOWING DOWN MWD DRILLER WENT TO FUNCTION ANNULAR AND UNINTENTIONALLY FUNCTIONED BLIND RAMS EDC SECTION OF MWD TOOL WAS PINCHED NORDIC AND BP SUPERINTENDENTS NOTIFIED ENSURED HOLE FULL AND CONTINUED LAYING DOWN BHA SECURED WELLBORE-SWAB AND MASTER VALVES CLOSED 19:00 - 20:00 1.00 STWHIP N HMAN 10,845.00 WEXIT STANDDOWN TO REVIEW DETAILS OF INCIDENT WROTE INCIDENT REPORTS DOCUMENTED DAMAGE DISCUSSED CHANGES TO ENSURE NO REPEAT INCIDENT PJSM FOR PULLING RAMS AND PRESSURE TESTING 20:00 - 22:30 2.50 STWHIP N HMAN 10,845.00 WEXIT PULLED BLIND RAMS FOR INSPECTION-NO DAMAGE SHELL TEST 250/4500PSI-GOOD TEST PRESSURE TEST BLINDS 250/3500 PSI- GOODTEST CHANGED OUT BLADE SEAL AS PER NORMAL PRACTICE. 22:30 - 23:00 0.50 STWHIP P WEXIT BLOW DOWN KILL LINE BLOW DOWN BOP STACK 23:00 - 23:15 0.25 STWHIP P WEXIT PJSM ON PICKING UP MILLING BHA IN ATTENDANCE:DRILLER AND CREW,SLB COIL OPERATOR,BAKER TT REP,BAKER DD AND MWD AND WSL. Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 6 ofe10-' Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date: 10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table 1,67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT j NPT Depth Phase 1 Description of Operations (hr) (usft) 23:15 - 00:00 0.75 STWHIP P WEXIT PICKING UP MILLING BHA OPEN MASTER TO CONFIRM WELL IS ON VAC -CONFIRMED WELL TOOK 2 BBLS TO FILL 3.80"GO/3.79"NOGO ON MILL PICKED UP INJECTOR AND STABBED COIL PRESSURE TESTED QTS 250/3500 PSI- GOOD TEST 10/5/2013 00:00 - 00:30 0.50 STWHIP P WEXIT CONT PU INJECTOR AND STABBING COIL 00:30 - 03:30 3.00 STWHIP P WEXIT RIH W/MILLING BHA 75 FPM AFTER 1000' SLOW AS APPROACH WHIPSTOCK TIE IN@9560' TAGGED TOP OF WHIPSTOCK©10845' (UNCORRECTED) TOOK SPRS 03:30 - 06:00 2.50 STWHIP iF P WEXIT BEGIN MILLING WINDOW AT 10,847.8'MD. � C MM IN/OUT-2.85/2.85 MW IN/OUT-9.48/9.38 ,\A\\`\ J�1 T 'O�C/ IA/OA/PVTFS-2800,P 05/988/32506-2K � V 06:00 - 06:30 0.50 STWHIP P WEXIT CREW CHANGE. DISCUSS OPERATIONS AND CA) RIG STATUS. CONTINUE TO MILL WINDOW. HOLD WEEKLY SLT MEETING WITH RIG LEADERSHIP IN MAN CAMP. 06:30 - 11:00 4.50 STWHIP P ; WEXIT CONTINUE TO MILL WINDOW FROM 10852'. 2810 PSI FS AT 2.84 BPM IN/OUT. MW IN/OUT: 9.46/9.36 PPG WOB:1.76 K# IA/GA/PVT:449 PSI/199 PSI/325 BBLS BHP/ECD/TVD:4977 PSI/10.35 PPG/8954'. MILL WINDOW TO 10,856'. — UNCORRECTED WINDOW TOP:10,848'. BOTTOM:10,857'. 11:00 - 15:00 4.00 STWHIP P WEXIT MILL PILOT HOLE FROM 10,857'. 2800 PSI FS AT 2.86 BPM IN/2.88 BPM OUT. 3150 PSI AT 4.04 K#WOB. NOTE HIGH PERCENTAGE SAND IN BOTTOMS UP SAMPLE FROM 10,864'. 15:00 - 16:30 1.50 STWHIP P WEXIT DRESS WINDOW WITH 3 UP/DOWN PASSES. 2710 PSI FS AT 2.85 BPM IN/OUT. DRY DRIFT RUNNING IN HOLE. WINDOW 'SMOOTH. 16:30 - 18:30 2.00 STWHIP P WEXIT OPEN EDC. CIRCULATE OUT OF HOLE. 2395 PSI AT 3.09 BPM. 118:30 - 19:00 0.50 STWHIP P WEXIT HELD PJSM FOR LD MILLING BHA. 19:00 - 19:30 0.50 STMILL P WEXIT LAYDOWN MILLING BHA. MILL-3.80 GO 3.79 NO GO. STRING MILL-3.78 GO 3.77 NO GO. 19:30 - 20:00 0.50 DRILL P PROD1 LOWER BTT MILLING TOOLS AND EQUIPMENT THROUGH BEAVER SLIDE. Printed 10/21/2013 3:09:34PM North America-ALASKA-BP Page 7 sae Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 ; Spud Date/Time:11/15/1979 12:00:OOAM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA WI: Active datum:Kelly Bushing/Rotary Table(67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 23:00 3.00 DRILL N WAIT 10,868.00 PROD1 INSPECT TREE BOLTS AFTER MILLING WINDOW. TREE BOLTS LOOSE-CALLED FOR VALVE TO TO TIGHTEN BOLTS TO SPEC. WELLHEAD BOLTS LOOSE-CALLED FOR WELLHEAD CREW TO TIGHTEN BOLTS TO SPEC. 23:00 - 23:30 0.50 DRILL P PROD1 HELD PJSM TO PICK-UP LATERAL BHA. 23.30 00:00 0.50 DRILL P PROD1 PICK UP LATERAL BHA.GET ONTO WELL WITH INJECTOR. 10/6/2013 00:00 - 00:30 0.50 DRILL P PROD1 PRESSURE TEST QTS 250/3500-PASSED. 00:30 - 04:00 3.50 DRILL 1 PROD1 RIH F/87'-9500'MD.LOG TIE-IN. — CORRECTED WINDOW DEPTHS:TOP: 10,848' RA TAG:10,855' BOTTOM:10,855'. DEPTH CORRECTION-21'FT. ----------- RIH TO 10,868'MD. 04:00 - 06:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL 4-1/8"LATERAL HOLE. F/10,868'-11,100'MD.AVG ROP-116 FPM MM IN/OUT-3.00/3.00 MW IN/OUT-9.4/9.39 FS-3100,PP-3300,ECD-10.35 IA/OA/PVT-645/85/305 06:00 - 08:00 2.00 DRILL P PROD1 WIPER TRIP FROM 11,053'. 2110 PSI AT 2.5 BPM. PVT:301 BBLS. WIPER BACK TO BOTTOM. WHIPSTOCK RA TAG LOGGED AT 10,855'. 08:00 - 12:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 11,053'. 3140 PSI FS AT 3.02 BPM IN/3.04 BPM OUT. 150-250 PSI MOTOR WORK .2-3K#WOB. MW IN/OUT:9.52/9.49 PPG. PVT:302 BBLS. IA/OA:220 PSI/181 PSI. BHP/ECD/TVD:5002 PSI/10.77 PPG/8943' - DRILL TO 11,350'. 12:00 - 15:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11,350'to 11,500'. 3100 PSI FS. 15:00 - 15:30 0.50 DRILL P PROD1 WIPER TRIP FROM 11,500' TO WINDOW. PVT:299 BBLS. LOG GR TIE IN. ADD 1'CORRECTION. 15:30 - 16:00 0.50 DRILL P PROD1 WIPER TRIP BACK TO BOTTOM. 3280 PSI AT 3.12 BPM IN. 16:00 - 18:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 11,500'TO 11,650'. 3120 PSI FS AT 3.05 BPM IN/OUT. WOB:2-3K# 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 4-1/8"LATERAL HOLE. F/11,635'-11,905'MD.AVG ROP-30 FPM I MM IN/OUT-3.00/3.00 MW IN/OUT-9.57/9.51 1 FS-3300,PP-3600,ECD-10.95 IA/OA/PVT-564/181/272 AVG WOB-3.5K# 10/7/2013 00:00 - 01:30 1.50 DRILL P PROD1 DRILL AHEAD FROM 11,905'TO 11,923'. 3200 PSI FS AT 3.01 BPM IN/OUT. WOB:4-5K# BEGAN SEEING REDUCED ROP @ 11,700' 0 ROP(4)11,923' ATTEMPT TO STACK WEIGHT TO SEE MOTOR STALL NO STALL SEEN Printed 10/21/2013 3:09:34PM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Wet Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release: 10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table @67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 23:00 ~, 3.00 DRILL N WAIT 10,868.00 PROD1 INSPECT TREE BOLTS AFTER MILLING WINDOW. TREE BOLTS LOOSE-CALLED FOR VALVE TO 1 TO TIGHTEN BOLTS TO SPEC. WELLHEAD BOLTS LOOSE-CALLED FOR WELLHEAD CREW TO TIGHTEN BOLTS TO SPEC. 23:00 - 23:30 0.50 DRILL P PROD1 HELD PJSM TO PICK-UP LATERAL BHA. 23:30 - 00:00 0.50 DRILL P PROD1 PICK UP LATERAL BHA.GET ONTO WELL WITH INJECTOR. 10/6/2013 00:00 00:30 0.50 DRILL P PROD1 PRESSURE TEST QTS 250/3500-PASSED. 00:30 04:00 3.50 DRILL P PROD1 RIH F/8T-9500'MD.LOG TIE-IN. — CORRECTED WINDOW DEPTHS:TOP: 10,848' RA TAG:10,855' BOTTOM:10,855'. DEPTH CORRECTION-21'FT. ' RIH TO 10,868'MD. 04:00 - 06.00 2.00 DRILL P PROD1 DIRECTIONAL DRILL4-1/8"LATERAL HOLE. F/10,868'-11,100'MD.AVG ROP-116 FPM MM IN/OUT-3.00/3.00 MW IN/OUT-9.4/9.39 FS-3100,PP-3300,ECD-10.35 IA/OA/PVT-645/85/305 06:00 - 08:00 2.00 DRILL P PROD1 WIPER TRIP FROM 11,053'. 2110 PSI AT 2.5 BPM. PVT:301 BBLS. WIPER BACK TO BOTTOM. _ WHIPSTOCK RA TAG LOGGED AT 10,855'. 08:00 - 12:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 11,053'. 3140 PSI FS AT 3.02 BPM IN/3.04 BPM OUT. i 150-250 PSI MOTOR WORK. .2-3K#WOB. MW IN/OUT:9.52/9.49 PPG. PVT:302 BBLS. IA/OA:220 PSI/181 PSI. BHP/ECD/TVD:5002 PSI/10.77 PPG/8943' DRILL TO 11,350'. 12:00 - 15:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11,350'to 11,500'. 3100 PSI FS. 15:00 - 15:30 0.50 DRILL P PROD1 WIPER TRIP FROM 11,500' TO WINDOW. PVT:299 BBLS. LOG GR TIE IN. ADD 1'CORRECTION. 15:30 - 16:00 0.50 DRILL P PROD1 WIPER TRIP BACK TO BOTTOM. {3280 PSI AT 3.12 BPM IN. 16:00 - 18:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 11,500'TO 11,650'. 3120 PSI FS AT 3.05 BPM IN/OUT. WOB:2-3K# L 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 4-1/8"LATERAL HOLE. 'F/11,635'-11,905'MD.AVG ROP-30 FPM MM IN/OUT-3.00/3.00 MW IN/OUT-9.57/9.51 FS-3300,PP-3600,ECD-10.95 IA/OA/PVT-564/181/272 AVG WOB-3.5K# 10/7/2013 00:00 - 01:30 1.50 DRILL P PROD1 DRILL AHEAD FROM 11,905'TO 11,923'. 3200 PSI FS AT 3.01 BPM IN/OUT. WOB:4-5K# BEGAN SEEING REDUCED ROP(cit 11,700' DROP @11,923' ATTEMPT TO STACK WEIGHT TO SEE MOTOR STALL NO STALL SEEN Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Spud Date/Time:11/15/1979 Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code , NPT NPT Depth Phase j Description of Operations (hr) (usft) 01:30 - 05:00 3.50 DRILL P PROD1 POOH TO CHANGE BIT. POH F/11,923'-10,800'MD. FLOW CHECK AT WINDOW.OPEN EDC. POOH F/10,800'-200'MD.FLOW CHECK. TAG UP,STAND INJECTOR BACK. 05:00 - 05:30 0.50 DRILL P PROD1 INSPECT DIRECTIONAL MOTOR&MWD TOOLS. CHANGE BIT,MU BHA#4,GET ONTO WELL WITH INJECTOR. PRESSURE TEST QTS 250/3500-PASSEd. CHART SAME. 05:30 - 06:00 0.50 DRILL P PROD1 RIH WITH BHA#4 F/87'-9500'MD. EDC OPEN. 1183 PSI AT 1.0 BPM. 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS OPERATIONS AND RIG STATUS. CONTINUE TO RUN IN HOLE. 06:30 - 08:00 1.50 DRILL P PROD1 CONTINUE TO RUN IN HOLE. 08:00 - 08:15 0.25 DRILL • P PROD1 LOG GR TIE IN. SUBTRACT 19'CORRECTION. 08:15 - 09:30 1.25 DRILL P PROD1 WIPER IN HOLE TO BOTTOM. HOLE SMOOTH. 09:30 - 12:30 3.00 DRILL P PROD1 DRILLAHEAD FROM 11,923'. 3702 PSI ON BTM AT 3.02 BPM IN/OUT. WOB: 2.5-3.0K# MW IN/OUT:9.60/9.51 PPG. PVT:246 BBLS. IA/OA:519 PSI/125 PSI. BHP/ECD/TVD:5191 PSI/11.15 PPG/8964' 12:30 - 13:00 0.50 DRILL-- P PROD1 300'WIPER TRIP TO CLEAN HOLE. 13:00 - 16:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 12,100'. PUMP PRESSURES INCREASING. DECIDE TO BEGIN MUD SWAP. CONTINUE TPO DRILLAHEAD. 3391 PSI FS AT 3.04 BPM. 16:00 - 17:30 1.50 DRILL P PROD1 DRILL INTO UNEXPECTED SHALE WHILE LOOKING FOR HOT INTERVAL. WIPER TRIP TO WINDOW WHILE GEOSTEERING PLAN FORWARD IS REVIEWED. 17:30 - 18:00 0.50 DRILL P PROD1 LOG GR TIE IN FROM 10,890'. ADD 2' CORRECTION. ..---....------- 18:00 - 18:30 0.50 DRILL P PROD1 CREW CHANGE.INSPECT TOOLS AND EQUIPMENT. PERFORM WALK AROUND. 18:30 - 00:00 5.50 DRILL P PROD1 DIRECTIONAL DRILL 4-1/8"LATERAL HOLE. F/12,214'-12,380'MD.AVG ROP-30 FPM MM IN/OUT-3.05/3.05 MW IN/OUT-9.54/9.46 FS-3100,PP-3300,ECD-11.06 IA/OA/PVT-505/153/291 AVG WOB-1.4K# ***NOTE*** I DRILLAHEAD AS PER GEO SEARCHING FOR HOT.DRILLED 25'-50'INCREMENT SECTIONS, CIRCULATE BOTTOMS UP AND EVALUATING SAMPLES.LOCATED HOT©8982'TVD. CONTINUE DRILLING AHEAD PER GEO/DD. 10/8/2013 00:00 - 00:45 0.75 DRILL P PROD1 DRILL AHEAD FROM 12,380'TO 12,420'. 3100 PSI FS AT 3.05 BPM IN/OUT. WOB:2-3K# Printed 10/30/2013 11:19:05AM • North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor NORDIC CALISTA UW: Active datum:Kelly Bushing/Rotary Table @67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 00:45 02:00 1.25 I DRILL P PROD1 300'WIPER TRIP TO CLEAN HOLE. WAIT FOR BOTTOMS UP AND COLLECT SAMPLE. 02:00 - 06:00 4.00 DRILL P PROD1 DIRECTIONAL DRILL 4-1/8"LATERAL HOLE. F/12,420'-12,650'MD.AVG ROP-57 FPM MM IN/OUT-3.05/3.05 MW IN/OUT-9.54/9.46 FS-3100,PP-3300,ECD-11.06 IA/OA/PVT-505/176/284 AVG WOB-2-3K# WIPER TRIPS EVERY 150'ORAS NEEDED 06.00 - 06:15 0.25 DRILL P PROD1 CREW CHANGE. DISCUSS CURRENT OPS AND RIG EQUIPMENT STATUS. CONTINUE TO DRILL AHEAD. 06:15 - 11:00 4.75 DRILL P PROD1 DRILL AHEAD FROM 12,420. 3200 PSI FS AT 3.15 BPM IN/OUT. 200-250 PSI MOTOR WORK. WOB:1:5-2.OK# MW IN/OUT:9.62/9.53 PPG. PVT:278 BBLS. IA/OA:665 PSI/182 PSI. BHP/ECD/TVDE: 5219 PSI/11.06 PPG/8983'. MAKE 150'BHA WIPER TRIPS EVERY 150'. 11:00 - 16:00 5.00 DRILL P PROD1 WIPER TRIP TO WINDOW. OPEN EDC AND CIRCULATE TO CLEAN HOLE. FLUSH MICRO-MOTION. 16.00 - 18:00 2.00 DRILL P PROD1 CLOSE EDC AND RIH. j TIE-IN WITH(+6)'CORRECTION. MAD PASS 12,850 TO TD. 18:00 - 00:00 6.00 DRILL P PROD1 DRILL AHEAD FROM 12,896'MD TO 13,31T MD SLOW ROP UNTIL 12,910'WHEN ROP INCREASE TO 120 FPH. MM IN/OUT-3.05/3.05 MW IN/OUT-9.64/9.59 FS-3180,PP-3464,ECD-11.12 IA/OA/PVT-745/172/232 WOB-1.3 TO 3.2K# 10/9/2013 00:00 - 00:30 0.50 DRILL P PROD1 DRILLING LATERAL SECTION FROM 13,317'MD TO 13,350'MD 00:30 - 03:00 2.50 CLEAN P PROD1 WIPER TRIP TO WINDOW 03:00 - 06:30 3.50 CLEAN P PROD1 DRILL AHEAD FROM 13,350'MD TO TD OF 13,590'MD ROP 70/120 FT HR MM IN/OUT-3.05/3.05 MW IN/OUT-9.64/9.59 FS-3180,PP-3464,ECD-11.12 IA/OA/PVT-745/172/232 WOB-1.3 TO 3.2K# 06:30 - 09:00 2.50 CLEAN P PROD1 WIPER TRIP TO WINDOW. OVERPULL TO 80K IN SHALE AT 12,200'. MWD TOOL FAILURE NEAR WINDOW.RIH TO TD. POH FROM TD FOR WIPER TO SURFACE. 09:00 - 12:30 3.50 CLEAN P PROD1 POH FROM TD FOR WIPER TO SURFACE. FLOW CHECK ABOVE WINDOW FOR 5 MIN, NO FLOW. COMPLETE MUD SWAP. DUE TO MWD FAILURE,UNABLE TO OPEN EDC. POH PUMPING 3 BPM. 12:30 - 14:00 1.50 CLEAN N DFAL PROD1 FLOW CHECK AT SURFACE 5 MIN,NO FLOW. TAG UP,REMOVE INJECTOR. LAY DOWN BHA.BIT RATED 2-2. MU BHA WITHOUT RES FOR CLEANOUT. INSTALL INJECTOR AND PRESSURE TEST QTS TO 250/3500 PSI. 14:00 - 16:00 2.00 CLEAN P PROD1 I RIH 1MTH CLEANOUT BHA#5 AT 90 FPM. Printed 10/30/2013 11:19:O5AM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:F-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/29/2013 End Date:10/9/2013 X3-0140T-C:(3,477,766.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release: 10/14/2013 Rig Contractor.NORDIC CALISTA U WI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 4- 16:00 16:00 - 18:00 2.00 CLEAN P PROD1 TIE-IN AT RA TAG VNTH(-21.5)'CORRECTION. RIH TO TD. TAG TD FOR FINAL DEPTH OF 13.588'. LAY IN LINER RUNNING PILL W/LUBRI-BEADS 18:00 - 22:30 4.50 CLEAN P PROD1 POOH W/BHA#5 FOR LINER RUN. FLOW CHECK AT WINDOW. OPEN EDC AND CIRC MAX RATE 168GPM(4) 3500PSI LOW CHECK AT SURFACE. 22:30 - 00:00 1.50 CLEAN P PROD1 LAY DOWN CLEANOUT BHA. -CUT 50'COIL AND PUMP SLACK FOWARD. -CLEAN/CLEAR FLOOR - END RON EVENT.SWITCH TO CON EVENT Printed 10/30/2013 11:19:05AM North America-ALASKA-BP Page 1 Operation Summary Report Common Well Name:F-09 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/10/2013 End Date:10/14/2013 X3-0140T-C:(1,641,114.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor:NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/10/2013 00:00 - 03:00 3.00 CASING P RUNPRD PUMP E-LINE FORWARD AT 3 BPM,CUT 240' ELINE AND 50'COIL. DRESS COIL. HEAD UP BTT CONNECTOR,PULL AND 'PRESSURE TEST SAME. -PUMP 3/4"BALL TO DRIFT COIL. 03:00 06:00 3.00 CASING P RUNPRD PJSM,RIG UP AND RUN LINER TO 830'TOTAL OF 20 JTS 3 1/4"AND 3 JTS 2 7/8"LINER IN I THE HOLE. DRIFT 2-7/8"CONNECTIONS AND FIRST 5 OF 3-1/4"CONNECTIONS. 06:00 - 07:00 1.00 CASING P 1 RUNPRD CREW CHANGE,CHECKS AND WALK AROUNDS. PJSM FOR MAKING UP LINER. 07:00 - 08:00 1.00 CASING P RUNPRD CONTINUE MAKING UP 9-1/4"LINER TO JOINT 32. KICK WHILE TRIPPING DRILL WITH LINER ACROSS STACK,STAB AND TORQUE SAFETY VALVE,CLOSE VALVE AND SIMULATE SI ANNULAR AND CHOKE HCR.MR. 08:00 - 13:00 5.00 CASING P RUNPRD MU 3-1/4"LINER JOINTS 32-90 OF 3-1/4"AND JOINTS 95-119 OF 3-1/2".FILL LINER EVERY 10 1 JOINTS. MU X NIPPLE,DEPLOYMENT SLEEVE,LINER RUNNING TOOLS AND 4 JTS OF PH6 PIPE. 13:00 - 14:00 1.00 CASING P 1 RUNPRD PICKUP INJECTOR,MU CROSSOVERS AND I 'LOCKABLE SWIVEL.GET ON WELL. i 'PRESSURE TEST QTS TO 250/3500 PSI. 14:00 - 16:00 2.00 CASING P RUNPRD RIH WITH LINER ASSEMBLY PUMPING 0.6 • BPM AT 1655 PSI INITIALY PUMP PRESSURE. 16:00 - 17:45 1.75 CASING P RUNPRD AT WINDOW FLAG,TAKE NOTE OF DEPTH SHIFT(-31.4)'.NO CORRECTION MADE. I RUN LINER IN OPEN HOLE,WORK PIPE 1 FROM 13,200'TO TD.TAG BOTTOM AT 13,614 (UNCORRECTED BUT 5'FROM EXPECTED TAG).PU WEIGHT 57K. CORRECT TAG DEPTH TO FINAL SURVEY/LOGGED TD OF 13,588'. 17:45 - 18:30 0.75 CASING P RUNPRD LAUNCH 5/8"BALL TO RELEASE LINER.BALL •LAND ON SEAT AT 48.6 BBLS. 18:30 - 22:30 4.00 CASING P RUNPRD SWAPWELLTOI%KCL 22:30 00 00 1.50 CEMT P RUNPRD PJSM,PT CEMENT LINES TO 6K,BATCH MIX 33 BBLS 15.9#CEMENT Printed 10/30/2013 11:50:33AM North America-ALASKA-BP Page 2,4g- Operation o -Operation Summary Report Common Well Name:F-09 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/10/2013 End Date:10/14/2013 X3-0140T-C:(1,641,114.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:11/15/1979 12:00:00AM Rig Release:10/14/2013 Rig Contractor NORDIC CALISTA UWI: Active datum:Kelly Bushing/Rotary Table©67.30usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/11/2013 00:00 - 02:00 2.00 CEMT P RUNPRD LOAD 26 BBLS OF 15.8 PPG CEMENT(20% EXCESS CEMENT) DISPLACE CEMENT WITH 79.7 BBLS OF KCL CONTAM PILL BEGIN PUMPING KCL CONTAM BEHIND CEMENT AT 1.5 BPM W/2000 PSI SLOWED PUMP RATE TO 0.75 BPM W/758 PSI AT 53.0 BBL PUMPED. SHUT DOWN PUMP AT 80.1 BBL. PICKED UP FROM 13588'TO BREAK OVER AT 13575'THEN AN ADDITIONAL 13'TO 13562'. SET BACK DOWN W/10K DOWN TO 13578'. PRESSURE UP TO 1200 PSI. PICK UP TO 13571'AND PRESSURE BLED OFF. PUMP 5 BBL(2 BBL CEMENT AND 3 BBL CONTAM PILL)THROUGH SIDE EXHAUST. OPENED BAKER CHOKE AND SET BACK TO TO 13578'. WITH 10K DOWN WEIGHT CLOSED BAKER 'CHOKE AND BRING PUMPS ON. LINER WIPER PLUG SHEARED AT 3700 PSI. ZERO THE IN MICROMOTION AND DISPLACED U THE LINER WIPER PLUG WITH AN / ADDITIONAL 26.5 BBL. FINAL CIRCULATING PRESSURE AT 1.15 BPM WAS 2450 PSI. ` BUMPED PLUG UP TO 3400 PSI. HELD PRESSURE TO 30 SEC. BLED OFF THROUGH BAKER CHOKE AND CHECKED FLOATS. \,' FLOATS HELD. CLOSED BAKER CHOKE AND PRESSURED UP TO 1000 PSI. PICKED UP AND RELEASED FROM LINER. PRESSURE BLED OFF TO 825 PSI. BROUGHT PUMPS ON AT 0.75 BPM. CEMENT IN PLACE AT 01:47 ESTAMATED TOC AT 9991 FT MD BOC AT 13588 FT MD 02:00 - 04:30 2.50 CEMT P RUNPRD POH W/LINER RUNNING BHA PUMPING 1.12 BPM IN 0.56 BPM OUT W/312 PSI. WHILE POH AT-2500'RETURNS SHOWED UP TO 9.3 PPG ON THE OUT MM INDICATING CEMENT CONTAMINATION. SLOWED PULLING SPEED AND TOOK RETURNS OUT TO CUTTINGS BOX FROM 2500'TO 500'. RETURNS CLEANED UP AT 500'. 04:30 - 05:15 0.75 CEMT P RUNPRD PJSM. GET OFF WELL.STAND INJECTOR BACK. BREAK AND UD LINER RUNNING BHA. 05:15 05.45 0.50 BOPSUR P OTHCMP FUNCTION TEST BOPE FROM DRILLER'S CONSOLE IN DOGHOUSE. 05:45 - 07:15 1.50 EVAL P OTHCMP CUT OFF BTT COIL CONNECTOR. REHEAD WITH BTT SLIMHOLE COIL CONNECTOR. PULL TEST TO 42K,PRESSURE TEST TO 250/3500 PSI FOR 5 MIN. 07:15 - 07:45 0.50 EVAL P OTHCMP PJSM FOR MANRIDER,STRAP 1 STAND OF 1-1/4" 07:45 - 08:30 0.75 EVAL P OTHCMP PJSM WITH BAKER ATLAS FOR MAKING UP LOGGING BHA. WSL VERIFY LIFTING EQUIPMENT CERTIFICATIONS. LOAD BAKER ATLAS TOOLS INTO PIPE SHED. Printed 10/30/2013 11:50:33AM TREE= CNV FVVH LHEAD= MCEVOY �O 9 B 1/2CHROMSAY E TBG� 7"26#IJ4S WAS _S TED BACK @ ACTUATOR= OTIS - ------------------- --- 1 1 8902'AND RAN TO SURF.7"WAS HUNG IN OLD 9-5/8" INITIAL KB.ELE 67.32' / — — CSG SPOOL W/7"SLIPS"'" PRIOR WELLBORES NOT BF.ELEV= 38.17' KOP= 3200' 20"x 30"INSULATED — 110 SHOWN. Max Angle= 96°@ 10537, CONDUCTOR Datum MJ= 9919' ' ' Pt" _ 2030' —1"'"TOP OF 9-5/8"CASING STUB(1986 RWO?) Datum TVD= 8800'SS . 2229' �4-1/2"HES X NP,D=3-813' 9-5/8"CSG STUB(1986 RWO) H 2030' 10 GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80,BTC,D=12.347" — 2700' / ST MD 1`.i'i DEV TYPE VLV LATCH PORT DATE 6=AUTION:DAMAGLAIttA H 2930' *Irl *. 2 3418 3408 14 KBG-2 DMY BK 0 05/19/13 1 6212 5813 31 KBG-2 DMY BK 0 05/19/13 SROM F-20 COLLISION(JULY 1986) Al 8899' —17'TIW SNAT-6 PKR 7"LNR,29#,L-80,BTC,.0371 bpf,ID=6.184" —I 8902' 9214' j4-1/2"HESXNP,D=3.813" , , Minimum ID = 3.80" @ 9321' 4-1/2" HES XN MILLED NIP 2 4 9235' H7"x 4-1/2'BKR S-3 PKR,ID=3.87' ' ' 9258' _14-1/2"HES X NP,ID=3.813" k# L 9321' H 4-1/2"HES XN NP MLLED TO ' , ?ff/ ►� 3.80"(08/13/13) 9328' H 5-1/2"LNR TIEBACK SLV,ID=5-25" 4-1/2 TBG,12.6#,13CR,VAM TOP, —L 9334' / \J 9334' —14-1/2"VVLEG,D=3.958" .0152 bpf,D=3.958' tit H amp TT NOT LOGGED P ....4k... 9340' H7"x 5"BKR ZXP LT PKR,ID=4-40"1 9390' 1 9-5/8'CSG,47#,L-80,BTC,ID=8-681" 9350' — 7"x 5"BKR FLEX LOCK LNR HGR,ID=4.44" � 9360" —5'x 4-1/2"X0,ID=4.01" 7"LNR,26#,L-80 U4S,.0371 bpf,D=6.276" —I 9498 7"MLLOUT WINDOW 9498'-9511' TOP OF BOT WHIPSTOCK —I 9511' PERFORATION SUMUARY 10900' 4-1/2"CBP MLLED& REF LOG: BH GR PUSHED(08/13/13) ANGLE AT TOP FERF:94°@ 10560' ` Nate:Refer to Production DB for historical perf data 10903' 4-1/2"VVRP(09/05/08) SIZE SPF INTERVAL Opn/Sqz DATE SQZ 3-3/8" 6 10250-10280 0 02/23/10 3-3/8" 6 10300-10330 0 02/23/10 VVFPSTOCK(10/04/13) — 10848' /�/ 3-3/8" 6 10355-10385 0 02/23/10 2-7/8" 6 10560-10630 0 06/20/07 llirAli..�M 2-7/8" 6 10650-10680 0 06/20/07 V��' 2-7/8" 6 10700-10840 0 06/20/07 PB1) H 11263' 2-7/8" 6 11080-11195 06/20/07 4-1/2"LNR, 12.6#,L-80 BT-M,.0152 bpf,ID=3.958" 11350' TD 12040' DATE REV BY CONVENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/07/79 N22E ORIGINAL COMPLETION 03/02/10 LMRPC CEP,ADD PERFS(02/24/10) WELL: F-09B 08/17/86 RISE RWO 02/11/13 RCT/AD XN NPD CORRECTION PERMT No: 2070130 01/02/02 NORDICI CTD SIDETRACK(F-09A) 05/24/13 JLS/JM3 GLV CIO(05/19/13) AR No: 50-029-20403-02 06/22/07 N2ES SIDETRACK(F-09B) 08/11/13 PJC DRAWNG/CMT CORRECTION SEC 2,T11 N,R13E,2467'FM_2404'FVVL 04/20/09 SVSV DRLG FINAL CORRECTIONS 09/03/13 RM-VJM) MLLED XN NP&CUP(08/13/13) 06/16/09 /TLH CORRECTIONS BP Exploration(Alaska) ~* ~'~ ,'~ ~~ ~~~' ~~ ~~~ ,. ' x .~,.. ~' ~` ~. ~,~;: ~~ ~ x;F c MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVED ,,,,.~ 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ^ ~ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extensio Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re-enter Suspended W ~jt~ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development ^r Exploratory ^ 207-0130 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-20403-02-00 8. Property Designation (Lease~Number) : ~ 9. Well Name and Number: ADLO-028281 ~ PBU F-09B 10. Field/Pool(s): \ PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12040 feet Plugs (measured) 10905' 10540' feet true vertical 9045.67 feet Junk (measured) None feet Effective Depth measured 11263 feet Packer (measured) 9235 true vertical 9022.99 feet (true vertical) 8366 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" SURFACE - 110 SURFACE - 110 Surface 2700 13-3/8" 72# L-80 SURFACE - 2700 SURFACE - 2699 4930 2670 Intermediate 7360 9-5/8" 47# L-80 2030 - 9390 2030 - 8427 6870 4760 Production Liner 599 7" 29# L-80 8899 - 9498 7993 - 8528 8160 7020 Liner 2022 4-1/2" 12.6# L-80 9328 - 11350 8369 - 9024 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ - True Vertical depth: _ _ _ _ - Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR SURFACE - 9334 SURFACE - 8375 Packers and SSSV (type, measured and true vertical depth) 7"X4-1/2" BKR S-3 PKR 9235 8366 12. Stimulation or cement squeeze summary: ~ a ~vyy~y'~y{~', {2Y ([ }h~ ,p ~ ~ ~~ Intervals treated (measured): Treatment descriptions including volumes used and final pressu re: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 907 59344 12 2055 Subsequent to operation: 14. Attachments: 1 Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X 1 . Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 3/4/2010 ~ 3' g ~~~ Qnn,,,, MAR 0 81010 Form 10-404 Revised 7/2009 ~ ~ ~ ~ ~~ t ~ ~ ~ BLJ1~15 Submit Original Only F-096 207-013 PERF ATTAf_MFNT Sw Name Operation Date Pert Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base F-09B 6/22/07 PER 10,560. 10,630. 9,031.5 9,028.08 F-09B 6/22/07 PER 10,650. 10,680. 9,027.26 9,025.89 F-09B 6/22/07 PER 10,700. 10,840. 9,024.87 9,018.61 F-09B 6/22/07 PER 11,080. 11,195. 9,017.95 9,021.33 F-09B 9/5/08 BPS 10,905. 11,195. 9,016.41 .9,021.33 F-09B 2/23/10 APF 10,355. 10,385. 9,039.24 9,039.16 F-09B 2/23/10 BPS 10,540. 10,560. 9,033.23 9,031.5 F-096 2/24/10 APF ~/ 10,250. 10,280. 9,033.69 9,037.53 F-096 2/24110 APF ~% 10,300. 10,330. 9,038.94 9,039.5 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ r .. F-09B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 2/22/2010;CTU 8 ,1.75" CT, Job scope :Set CIBP and adperf. Attempt to dig out after weather days. Weather picks back up and decision made to secure unit again. i 2/23/2010~CTU #8 1.75" CT Job Scope: Set CIBP, 90' Adperf. Inspect injector after wind storm. Wait on new methanol transport. Preform weekly BOP test.RlH with _ Halliburton EZ DRILL SVB CIBP set at 10540' POOH Make up 30' of 3 3/8" I, HMX pert guns at 6 shot per foot. Run in hole to~plug at 10540' MD, tag and P/U Ito 10385'. Fire guns with good indication that guns have fired and POOH. 2/24/2010~CTU #8, 1.75" CT Job scope: Adperf. POOH after first perforation run, at surface Iconfirm guns fired. M/U 2nd set of 3 3/8" 3406PJ- 6 SPF- HMX guns (30 ft) at 6 spf lop shot at 10300' bottom shot 10330'. Run back in hole. OOH confirmed Iguns fired. M/U & RIH w/ run # 3 set of 3 3/8" 3406PJ- 6 SPF- HMX guns (30 ft) at 6 spf Top shot @ 10250' & bottom shot @ 10280' ,POOH, confirm guns fired, recovered ball. RDMO. End ticket at 23:59. Job complete. FLUIDS PUMPED BBLS 255 Meth/water 1 DIESEL 256 Total TREE = CIW WELLHEAC~ - MCEVOY ACTUATO~c = ~ OTIS KB. ELEV = 67.32' BF. ELEV = 38.17' KOP = 3200' Max Angle = 96° @ 10537' Datum MD = 9919' Datum TVD = 8800' SS ~20" x 30" INSULATED CONDUCTOR ( 110' 13-318" CSG, 72#, L-80, BTC, ID = 12.347" 2700' CAUTION: DAMAGE AR ~ 2930' FROM F-20 COLLISION ~ 7" INR, 29#, L-80, BTC, .0371 bpf, ID = 6.184" ~-j $902' 7" TIW SNAT-6 PKR 9214' ~-{4-112" HES X NIP {9CR), ID = 3.813" Minimum ID = 3.725" @ 9321' 4-1/2" HES XN NIPPLE 9235' 7" x 4-1/2" BKR S-3 PKR, ID = 3.87" 925$' i-{4-112" HES XNIP (9CR), ID = 3.813" 4-1/2" HES XN NIP (9CR), ID = 3.813" 9328 -~ 5-1/2" LNR TIEBACK SLV, ID = 5.25" I ' 9334' 4-112" WLEG, ID = 3.958" 4-1/2" TBG, 12.6#, 13CR, VAM TOP, 9334 .0152 bpf, ID = 3.958" ~_~ ELMD TT NOT LOGGED 9-5/8" CSG, 47#, L-80, BTC, ID = 8.681" g390' 9340' 7" x 5" BKR ZXP LT PKR, ID = 4.40" 9350' T' x 5" BKR FLEX LOCK LNR HGR, ID = 4.44" " " ' 9360' -~' x 4-112" XO, ID = 4.01" LNR, 26#, L-80, IJ4S, .0371 bpf, ID = 6.276 7 94~$ TOP OF BOT WHIPSTOCK 9511' T' MILLOUT WINDOW 9498' - 9511 PERFORATION SUMMARY REF LOG: BHI GR 10903' 4-112" WRP (09/05108) ANGLE AT TOP PERF: 94° @ 10560' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10560 - 10630 O 06/20/07 2-718" 6 10650 - 10680 O 06/20/07 2-7/8" 6 10700 - 10840 O 06/20/07 2-7/8" 6 11080 - 11195 C 06/20/07 pgTp 11263' 4-1/2" LNR, 12.6#, L-80, IBT-M, .0152 bpf, ID = 3.958" 11350' (~ 12040' DATE REV BY COMMENTS DATE REV BY COMMENTS 12/07/79 N22E ORIGINAL COMPLETION 04/20/09 SVSV DRLG FINAL CORRECTIONS 08/17/86 N18E RWO 06!16/09 /11H CORRECTIONS 01/02/02 NORDICI CTDSIDETRACK{F-09A) 06/22/07 N2ES SIDETRACK (F-09B} 02/14/09 /SV DRLG DRAFT CORRECTIONS 05126!09 PJC WRP (09!05108} PEF2FS ADDED PRUDHOE BAY UNIT WELL: F-09B PERMff No: 2070130 API No: 50-029-20403-02 SEC 2, T11 N, R13E, 2467' FNL, 2404' FWL BP Exploration (Alaska) F -~ ~ ~ SAFETY NOTES: "*4-1/2" CHROMETBG 8 NIPPLES"" `"*~9-518" CSG WAS CUT @ 2030'. 7" 26# IJ4S WAS TIED BACK @ 8902' AND RAN TO SURF. 7" WAS HUNG IN OLD 9- 5/8" CSG SPOOL W/7" SLIPS"*" ORIGINAL WELL (F-09) NOT SHOWN ON DIAGRAM. I 2030' '**TOP OF 9-5/8" CASING STUB (1986 RWO?) 2229' 4-1/2" HES X NIP (9CR), ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 3418 6212 3408 5813 14 31 KBG-2 KBG-2 DOME SO BK BK 16 20 07118/07 07/18/07 ~z ~~~ DATA SUBMITTAL COMPLIANCE REPORT 6/22I2009 Permit to Drill 2070130 Well Name/No. PRUDHOE BAY UNIT F-09B Operator BP EXPLORATION (ALAS!(A) INC API No. 50-029-20403-02-00 MD 12040 TVD 9046 Completion Date 6/22/2007 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATAINFORMATpN Types Electric or Other Logs Run: DIR / GR / RES, NEU / DEN, RES / GR (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH ! i pe nieairrmc ~.~~~~~~ rvame ~ca~C ~.~ewa rvo araR aiop ~n rcecervea ~ommenrs ED C Las 15485 Induction/Resistivity 9292 12040 Open 10/3/2007 DRHO, FNCL, GR, NCNL, NPHI, RHOB, ROP w/EMF , graphics Rpt 15503 LIS Verification 9291 12031 Open 10/3/2007 LIS Veri, GR, NCNT, FNCT, NPHI, RPM, FET, RPD, RHOB, DRHO, ROP D C Lis 15503 ~duction/Resistivity 9291 12031 Open 10/3/2007 LIS Veri, GR, NCNT, FNCT, NPHI, RPM, FET, ~ RPD, RHOB, DRHO, ROP w/graphics D D Asc Directional Survey 28 12040 Open 12/3/2007 I pt Directional Survey 28 12040 Open 12/3/2007 `~Log Induction/Resistivity 25 Col 9480 12040 Open 6/19/2008 MD ROP, DGR, EWR, ALD, CTN og Induction/Resistivity 25 Col 8510 9045 Open 6/19/2008 ND DGR, EWR, ALD, CTN D C 'F6993-'"5ee Notes 0 0 Open 6/19/2008 MD and NG EWR logs in `~'~~`f PDS, EMF and CGM ' Weil Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ~ 6~J DATA SUBMITTAL COMPLIANCE REPORT 6/22/2009 Permit to Drill 2070130 Well Name/No. PRUDHOE BAY UNIT F-09B MD 12040 ND 9046 ADDITIONAL INFORMATION Well Cored? Y N~ Chips Received? Yf71~ Analysis ~-Hd Received? Completion Date 6/22/2007 Operator BP EXPLORATION (ALASKIy INC Completion Status 1-OIL Current Status 1-OIL Daily History Received? Y ~ Formation Tops ~ API No. 50-029-20403-02-00 UIC N Comments: Compliance Reviewed By: ~k~-~'~' Date: ~~ v~- ~`'~ ~ ~ ~ ~ C~ WELL LOG TRANSMITTA~, To: State of Alaska Alaska Oil and Gas Conservation Comm. June 12, 2008 Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: F-09B AK-MW-504370 F-09B: 2" x 5" MD RESISTIVITY & GAMMA RAY Logs: 1 Color Lo 50-029-20403-02 g 2" x 5" TVD RESISTIVITY & GAMMA RAY Logs: 1 Color Lo 50-029-20403-02 g Digital Log Images: 1 CD Rom 50-029-20403-02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 690Q=Arctic BI~d. ,. AncHorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petrotechnical Data Center, MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 r /~~ Signed: ,r\' ~, '~/ - `' ( ~~, ~,___~.,~ ~f~~--°-,/'.~1~ ;'~ ~~~/ ! • 18-Sep-07 AOGCC Attn: Christine Mahnken 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well F-09B Dear Dear Sir/Madam: Enclosed are 2 survey hard copy(s) and a disk with the *.PTT and *.PDF files. Tie-on Survey: 9,498.00' MD Window / Kickoff Survey 9,472.00' MD (if applicable) Projected Survey: 12,040.00' MD PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO Timothy.Allen@HALLIBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Timothy Allen 6900 Arctic Blvd. Anchorage, AK 99518 Date ~ ~~7 Signed `` `-' Please call me at 273-3534 if you have any questions or concerns. Regards, Timothy Allen Survey Manager Attachment(s) av~-c~t3 ~ ~ W'ELL LOG TRANNS:~IITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7`'' Avenue, Suite 100 Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs: F-09B September 27, 2007 AK-iVIW-5043709 1 LDWG formatted CD rom with verification listing. API#:50-029-20403-02 PLEASE ACKIVOWLEDGE RECEIPT BY SIG;~'ING AivD RETL~R'VING A COPY OF THE TRA:vSMITTAL LETTER TO THE ATTEtiTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 r. , . , . ~ ~. .{ _ , :t , ~ v ,~; ~,r.s~ ,~~rf, Date ~ ° ~~ 1~ - ~ ~ BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Ancharage, Alaska 99508 Signed: ~`~-- ~l 3 ~ 1 J~S~ ~ ~ Saltmarsh, Arthur C (DOA) Page 1 of 1 From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Monday, August 13, 2007 2:11 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU F-09B / PTD # 207-013 H~ Art, Please reference #he following well: Well Name: PBU F-09B Permit #: 207-013 API #: 50-029-20403-02-00 Top Perf MD: 10560' Bottom PerF MD: 11195' This well began Production on July 21, 2007 Method of Operations is: Flowing Date of Test: July 22, 2007 Hours Tested: 6 24-Hour Rate / Oil-Bbl: 3,693 24-Hour Rate / Gas-Mcf: 27,683 24-Hour Rate / Water-Bbl: 167 Test Rate / Oii-Bbl: 923 Test Rate 1 Gas-Mcf: 6,921 Test Rate / Water-Bbl: 42 Choke Size: 96 Gas-Oil Ration: 7,495 Flow Tubing Pressure: 1,300 Casing Pressure: 1,500 Oil Gravity-API: 26 8/13/2007 ~~ ~~~v~ ~_ , ~~, ~ ~ STATE OF ALASKA ~ 8 ~~~~ ~ ~ ~~~~ ALASKA IL AND GAS CONSERVATION COM ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~;:k:~ ~} _~ Ci~~ Cons. Commissiat~ ~d~ch~rag~ 1a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zonAC zs.~oe zo.aAC zs.~,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ~ Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 6/22/2007 ~~ 12. Permit to Drill Number 207-013 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/11/2007~ 13. API Number 50-029-20403-02-00 ' 4a. Location of Well (Governmental Section): Surface: ' ' ' 7. Date T.D. Reached 6/18/2007 '' 14. Well Name and Number: PBU F-09B- FWL, SEC. 02, T11 N, R13E, UM 2467 FNL, 2405 Top of Productive Horizon: 4407' FNL, 751' FEL, SEC. 03, T11 N, R13E, UM 8• KB (ft above MSL): 64.99' ' Ground (ft MSL): 36.49' 15. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 4272' FNL, 2644' FEL, SEC. 03, T11 N, R13E, UM 9. Plug Back Depth (MD+ND) 11263 9023 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 651959 y- 5974333 Zone- ASP4 ' 10. Total Depth (MD+ND) 12040 9046 16. Property Designation: ADL 028281 TPI: x- 648845 y- 5972330 Zone- ASP4 Total Depth: x- 646949 y- 5972428 Zone- ASP4 11. SSSV Depth (MD+~/D) None 17. Land Use Permit: 18. Directional Survey ~ Yes ^ No Submit ele ronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (ND): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIR / GR / RES, NEU / DEN, RES / GR Tdio wiJ/DOiJ~ irld S,~'~jJ~a 22. CASING, LINER AND CEMENTING RECORD CASING SETfING< DEPTH MD< SETTING DEPTH ND f jp~~ 'AMOUNT' ' ` WT. PER FT. GRAdE TOP ` BOTTOM TOP BOTTOM SIZE =CEMENTtNG RECORD PULLED= ` 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 7.9 cu ds Permafrost 13-3/8" 72# L-80 Surface 2700' Surface 2699' 17-1/2" 4269 cu ft Artic Set 9-5/8" 47# L-80 2030' 9390' 2030' 8427' 12-1 /4" 1230 cu ft Class 'G' 130 cu ft AS 7" 29# L- 0 8899' 7993' 8528' 8-1/ " 391 cu ft Class '' 4-1/2" 12.6# ~-80 9328' 11350' 8369' 9024' 6-1/8" 350 cu ft Class'G' 23. Open to production or inject ion? ~ Yes ^ No 24. Tus~w~ RECaRo If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): S¢e ~EPTH SET MD PACKER SET MD 2-7/8" Gun Diameter 6 SPF 4-1/2", 12.6#, 13Cr-80 9334' 9235' , MD TVD `SS> MD ND 10560' - 10630'~ 9032' - 9028' ~ 10650' - 10680' ~ 9027' - 9026' ~ 25i ACio, FRqCTURE, GEMENT SQUEEZE, ErC. ` ' 'I 0700' - 10840~ ~ 9025' - 9019~ DEPTH (NTERVAL MD AMOUNT & KIND OF MATERIAL USED 11080' - 11195' ~ 9018' - 9021' Freeze Protected with 72 Bbls of Diesel ZB. PRODUCTION TEST Date First Production: Not On Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: PROOUCr~on, FoR TEST PERIOD OIL-BBI: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-Oll RATIO: Flow Tubing Press. Casing Press: Cn~cu~areo 24-HouR RAre• OIL-BBL : GAS-MCF: WATER-BBL: OI~ GRAVITY-API ~CORR~: 27. CoRe DaTa Conventional Core(s) Acquired? ^ Yes ~ No Sidewal l Core s Ac uired? ^ Yes ~ No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. COM°LEtION None ~~'!~~ ~L~. S~P ~ 2 ~~~ ?D07 ~ ~_: - Form 10-407 Revised 02/2007 ~(~ ~~~ R 1 AC~INUED ON REVERSE SIDE ~ K ~ 11n ZS. GEOLOGIC MARKERS ~LIST ALL FORMATIONS AN ERS ENCOUNTERED~: Z9. FORMATION TESTS NAME MD TVD Well Tested . ^ Yes ~ No Permafrost TOp If yes, list intervals and formations tested, briefly summarizing test resuits. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 9490' 8520' None Shublik 9530' 8557' Sadlerochit 9606' 8625' 42N 9703' 8705' Top of CGL 9777' 8759' Base of CGL 9862' 8822' 25N 9952' 8890' 21 N 10126' 8995' 14N 10388' 9039' 14N (Invert) 10542' 9033' 14N (Revert) 11193' 9021' 14P 11817' 9030' Formation at Total Depth (Name): 14P 11817' 9030' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. ' Signed Terrie Hubble '( Title Technical Assistant Date v~~~ ~ PBU F-09B 207-013 P~paredByNameMumber.~ Terrie Hubble, 564-4628 Well Number Permit No. / A fOV81 NO. Drilling Engineer: Kris Honas, 564-4338 INSTRUCTIONS GeNeaa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information ~equired by 20 AAC 25.071. Form 10-407 Revised 02J2007 Submit Original Onty ~ ~ ,~,,, ~~~== ~'~ ~ ~ ~~ , ~ ` a .~ ~ - Q ~ ~ F ~~~E ~ ~ ~ y~~1~7 ', 'S~ '' z' ~'~" . O ~. O ~~ d ,~ ~ i ..'; ; a ' F ~ ~ ~ N~~ta~. . ~,,~ il`t; i din ? ''. : ~ i . M ~ V i ~ ( i~ ti ~~ ~. .-. ' ~ ~y -~!- ~,~~ ' - ' ' rn ~ a ~~~`~~~ ~~ ~~ o ~ ~a1 , ~r ~ ~ v ~~~F,W rv ~~ .~~w ~ v ~ . a ~ ~~o ; r, ~~~~~~~ , I~ a ~~ .' ` ' i i ~ ~ i,~~ ~ ; ik ( ' E~;. ~ ,. ~ ~ ~, , v ~ ~ : ~ W ~ I ; :1 ~`'~brt , ~ ~ -. . ~~ 0- ~ ~ ~ ~ 7 ~:'' '~ w'ti ~ .: r ~ ~~ S ~ 9 ~ ~~ h ~ ~+ ~~ ~ . w y ~ i ~l i i ~ e } ~ °i ~ ' Q ~ S n' ~ ~ ~y, O : ~ ~~~ ~ ~ '~ ~ ~/~i~ ~ ~ Yii'a ~ ~:~j: J ~',,: ~ ~; ~ ~ """' ~ CI.1 ~ ~ ~ ~ O., ~ o = ~Ll # ~ ~ N ~ F~ ~ ~ ~~~~. W ii ~:' + ~ ~ ~~ t I ~ ~~g ;i f ~ ~' ~ ~ ~ 2 ~~liti ~; ~ ~ ~ ~ ~, ~ ~ ~~ ~~~ `` ~ ~~'~i ~~ z,s . ~.. ~ ~!v ~ ~ ao~ = ~~~~ ~I: ~ O S ~ ~' N J~U ~`~p~ ~ . ~, ~ :~ ~r~ .. ~ ~ ~= ~ ~ . ~ G ~ ~~ C ~ ~ ~~, ! 'i) "~pp~ ~ l~~ ~~~ ' " ~? c i~( ~ ~~i a i ~~ ~~ ~ ~ ill~i ( ~'~'~ ' h~ piii~~p (~ ~i ~ ` rii ;~i . '~~~~~~i ~ ~ , «~ ~ z r~~i~i~ ,~tdi~m i LL LL ~ ~~ ~ ~ ' ~~ ~ °~~ i ~ ~~ _ ~ ~;i~'~~ i~ i~li ~ ~ ' ~ L ~ i~ ~ L ili~=~il~, ~ z k ~ ~ L O J ~ O „ ~ ~ - ~ ~ , ~ (~ ~ ~" ~ N ~~ ~ h -~ j. . ~ O ~ U ~ ~ ~~. Q ~~ ~ r i ~ ~ ' ~ ~ Legal Well Name: F-09 Common Well Name: F-09 Spud Date: 12/21/2001 Event Name: REENTER+COMPLETE Start: 6/2/2007 End: 6/22/2007 Contractor Name: NABORS DRILLING CO. Rig Release: 6/22/2007 Rig Name: NABORS Rig Number: 2ES 6/2/2007 06:00 - 18:00 12.00 MOB P PRE Move Rig from F-44 to F-09 -Blow down service lines, Clean out under Rotary table and cellar -Move cutting Tanks, Move Mud Engineers & Mwd's Shack, -Bridle up and ready Derrick to Lay Over, Lower Derrick, -Disconnect Pit Module and spot by F-09 -Jack Rig , Remove mats Pull off well -Transport over to F-09, Matting access road and soft spots on F Pad, -Lined up Sub, Hecurlite area, And Spot Rig over well -Level Rig and secure cellar doors -Spot Pits, Camp, Shops, Cutting Tank, -Herculite and Berm areas as needed -Raise Derrick and Pin, Raise Cattle Chute, Bridle down and Rig up Floor and cellar Accept Rig ~ 18:00 hrs 6/2/2007 18:00 - 18:30 0.50 WHSUR P DECOMP Pre-Spud Meeting with NAD Rig Crew, NAD Toolpusher and BP WSL 18:30 - 19:30 1.00 WHSUR P DECOMP R/U secondary annulus valves,Flanges and Gauges on welihead 19:30 - 23:00 3.50 W HSUR P DECOMP R/U to Test with LRHOS, RU Pressure sensor & chart -Test OA T/2000 psi F/30 min, Bled off 350 psi over the test period -Test IA T/1000 psi, Good Test -Test Tubing to 1000 psi, drop 100 psi over 25 min. Retested O.K. Rig Down Litlle Red and Clear Lines 23:00 - 00:00 1.00 WHSUR P DECOMP Nipple Down Tree and Adaptor 7" IJ4S Threads in the Tubing Hanger, threads rounded, fair condition 6/3/2007 00:00 - 01:00 1.00 WHSUR P DECOMP Finish N/D Tree and Adaptor, -Remove Tree and Adaptor From Cellar and Ready for Shipment to Valve Shop 01:00 - 04:00 3.00 BOPSU P DECOMP Nipple Up BOPE's, Flowline, Service line, and Tumbuckles 04:00 - 05:00 1.00 BOPSU P DECOMP Rig up Test Joint and Test Equipment 05:00 - 12:00 7.00 BOPSU P DECOMP PJSM, Test BOPE, 250 low, 3500 psi hiqht holding each test Tested Gas alarms & PVT. Test witnessed by BP WSL Blair Neufeld, NAD TP, Bob Sheve of AOGCC Witness Test. Tested All Rams with 3 1/2" Test Joint, Tested Bag with 2 3/8" Test Joint Tested Accumulator All Tests passed 12:00 - 12:30 0.50 BOPSU P DECOMP R/D Test Equipment and Blow down Choke Manifold and Choke lines 12:30 - 14:30 2.00 DHB P DECOMP PJSM with Slickline crew and NAD Rig Crew -R/U Slickline Sheaves and Equipment -R/U Lubricator 14:30 - 16:30 2.00 DHB P DECOMP Retrieve PX Plug ~ 1960' 16:30 - 17:30 1.00 DHB P DECOMP R/D Slickline Sheaves and Equipment Printed: 7/10/2007 11:5020 AM , ~ ~ Legal Well Name: F-09 Common Well Name: F-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS DRILLING CO. Rig Name: NABORS 6/3/2007 I 17:30 - 19:30 I 2.001 PULL I P 19:30 - 21:00 ( 1.50I PULL I P 21:00 - 00:00 I 3.00 I PULL I P 6/4/2007 I00:00 - 09:00 I 9.00 I PULL I P 09:00 - 12:00 I 3.00 I BOPSUR P 12:00 - 13:30 I 1.501 FISH I P 13:30 - 19:30 I 6.00 I FISH I P 19:30 - 21:00 I 1.50I FISH I P 21:00 - 21:30 I 0.501 FISH I P 21:30 - 00:00 I 2.50I FISH I P 6/5/2007 00:00 - 01:30 1.50 FISH P 01:30 - 04:30 3.00 FISH P Spud Date: 12/21 /2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES DECOMP Rig up Lines to Cuttings Tank -Reverse Diesei From Tubing -Switch Valves and Circ. down Tubing taking retum out annulus dispiacing all the Diesel Freeze Protect from well, 174 bbls diesel/SW recycled GC2 -Circ, till Clean Seawater returns -Blow Down Lines6/3/ DECOMP PJSM with Baker Fishing Hand, Cameron Wellhead Tech, Schlumberger Control line spool operator, NAD Casing Crew, NAD Rig Crew -M/U Spear and engage Tubing -Bleed Off OA (Pressure built to 1000 psi since Displacement) apx. 0.5 bbls bleed off -Back out lock Down Screws -Pull Hanger to Floor 105k to pull free -L/D Hanger DECOMP R/U Power Tongs and C/O Handiing Equipment -RU Control line Spooler unit -UD Tubing to SSSV -Recovered 32 clamps and 4 SS Bands -continued ~aying Down 3 1/2" 9.3# L-80 EUE AB Mod Tubing DECOMP Lay Down 3 1/2" 9.3# L-80 EUE AB Mod Tubing -271 jts -cut jt 2.72' -5 GLMS -Sliding Sleeve -R/D and Clear floor of tubing handling equipment DECOMP M/U 4" Test Joint and set test plug -Test both sets ot rams to 250 psi low /3500 psi high -Test Bag to 250 low and 2500 psi high -All tests Good -retrieve test plug and UD test joint -Set wear bushing, -R/D test equipment and ready floor to pick up BHA DECOMP P/U Baker Fishing tools and equipment -M/U 2 3/8" Spear BHA -P/U 9 DC's DECOMP RIH picking up 4" Drill Pipe 1 x 1 -P/U 272 Jts DECOMP Wash Down from 8722 - 8765 C~ 1 bpm / 600 psi PUW 172k SOW 131k -Engage 2 3/8" tiner -Shut Down Pump and Pick up, PUW 175k 3k gain in string weight -POH to f/8765 - 7800 -5k Overpull ~ 8080' DECOMP Drop Dart -3500 psi to shear circ. sub -pump dry job and POH DECOMP POH standing back 4" DP 8.4 Seawater in / out DECOMP Continue POH with 3 1/2" DP with 2 3/8" tubing fish DECOMP PJSM on Laying Down 2 3/8 tubing Printed: 7/10/2007 11:50:20 AM , ~ ~ Legal Well Name: F-09 Common Well Name: F-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS DRILLING CO. Rig Name: NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/5/2007 01:30 - 04:30 3.00 FISH P DECOMP -UD Spear, Deployment Sub and XO sub -Laydown 22 jts of 2 3/8 4.7# L-80 STL tubing (703.59') -Cut joint length 9.4', cut end fiared to 2 11/16" 2 BP Intergal Turbo stabs retrieved Clear Floor of handling toois 04:30 - 06:00 1.50 FISH P DECOMP PJSM. PU and MU overshot assembly to 320'. 06:00 - 09:00 3.00 FISH P DECOMP RIH to 8724'. 09:00 - 10:00 1.00 FISH P DECOMP PJSM. Slip and cut 94' of drilling line. Inspect brushes. Lube Elmago splines. Inspect brakes and lines. 10:00 - 10:30 0.50 FISH P DECOMP Service top drive. 10:30 - 13:00 2.50 FISH P DECOMP MU last stand. Break circulation at 145 gpm wtih 295 psi. Up weight 175k, down 140k, RT 155k. Torque 4k at 30 rpm. Tag top of fish at 8749'. Wash down and dress stump at 40 rpm with 5k torque and 3-5k WOB. Swailow 9' of 3-1/2" tubing and release K-Anchor with 13 turns. Pump dry job and blow down top drive. 13:00 - 16:30 3.50 FISH P DECOMP POOH to 320'. Change out handling equipment. 16:30 - 17:30 1.00 FISH P DECOMP Rack back drill collars. Break and lay down 3-1/2" tubing fish and overshot. Clear and clean floor. 17:30 - 18:30 1.00 FISH P DECOMP Make up 3-H packer milling assembly to 316'. Change out handling equipment. 18:30 - 21:00 2.50 FISH P DECOMP RIH to 8720'. Install blower hose. Pick up single and last stand. Ta acker at 8810'. Up weight 170k, down 135k, RT 155k. SPR at 8810' at 2100 hours, both pumps 30/70, 45/180. 21:00 - 00:00 3.00 FISH P DECOMP Mill acker at 8810'. Pump at 200 gpm with 630 psi. Rotate at 100 rpm with 4k torque off bottom, 7k torque on bottom. Change milling parameters as needed to mill packer. 6/6/2007 00:00 - 05:30 5.50 FISH P DECOMP Mill 3-H packer. Pump at 0 to 210 gpm. Pressure from 0 to 620 psi. Rotate from 30 to 100 rpm with 3 to 9k torque. WOB from 5k to 35k. Pumped walnut pill. Slowing down to 20 gpm around bit. Spotted walnut pill at mill bit and shut down pumps. Rotated on packer. Milled to 8812'. Pressure increased 75 psi. Torque increased from 7k to 9k. Shut down milling. 05:30 - 06:00 0.50 FISH P DECOMP Circulate bottoms up at 400 gpm with 2100 psi. Rubber and metal in returns. 06:00 - 09:30 3.50 FISH P DECOMP Lay down single of DP. Remove blower hose. Blow down top drive. Install air slips. POOH to 317'. Up weight 175k. 09:30 - 11:30 2.00 FISH P DECOMP PJSM. Stand back drill collars. Lay down junk baskets, mill and bit sub. Clean out baskets and recover 30 Ibs of iron and rubber. Pick up and rig up baby tongs. Make up spear and BHA to 303'. Rig down baby tongs. 11:30 - 14:00 2.50 FISH P DECOMP RIH to 8800'. 14:00 - 15:30 1.50 FISH P DECOMP Break circulation at 84 gpm with 500 psi. Up weight 175k, down 140k. Attempt to locate packer. Pick up drill pipe singles and Rlii. EnQaqe packer at 9477'. Up weight 190k, down 145k. Pump dry job. 15:30 - 20:00 4.50 FISH P DECOMP POOH to 303'. Overpulls of 25-30k every 40' for the first 400'. Periodic 20k overpulls while pulling out of hole. Last overpull at -4500'. 20:00 - 21:00 1.00 FISH P DECOMP Pull BHA to floor. Release spear and lay down. Lay down lower half of packer at 8', 6' MOE and XO to 2-7/8". No slips recovered. Function rams to clear any debris from cavities. Printed: 7/70/2007 11:5020 AM ' ~ ~ Legal Well Name: F-09 Common Well Name: F-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS DRILLING CO Rig Name: NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/6/2007 20:00 - 21:00 1.00 FISH P DECOMP Clear and clean floor. 21:00 - 23:30 2.50 CLEAN P DECOMP Make up milling assembly to 86'. Up load MW D. Make up rest of BHA to 365'. RIH one stand. 23:30 - 00:00 0.50 CLEAN P DECOMP Attempt to pulse test MWD at 250 gpm with 520 psi. Test no good. Blow down top drive. No pressure increase on the OA during this time period. No fiuid bled off of OA. 6/7/2007 00:00 - 01:30 1.50 CLEAN N SFAL DECOMP Shallow pulse test failed. Run 10 stands in hole. Test again. Make several attempts before test was successful. 01:30 - 02:00 0.50 CLEAN P DECOMP RIH to 2700'. 02:00 - 04:30 2.50 CLEAN P DECOMP PJSM. Line up OA to cuttings tank and monitor. Circulate 290 bbls of 110 degree seawater at 250 gpm. Seawater coming back at 95 degrees at shut down. A trickie of fluid retuming as OA warmed up. Fluid less than 1/2 bph. No gas break out observed. Shut down pumps and fluid diminishing to less than 5 gph after 30 minutes. Shut in OA for 5 minutes and monitor with no pressure build up. Open up OA to monitor and pump 290 bbls of 110 degree seawater with less than 1/4 bph of fluid coming from OA. Again no gas breakout observed. Seawater coming back at 98 degrees from well. Shut down and monitor OA with fluid diminishing. 04:30 - 06:30 2.00 CLEAN P DECOMP RIH filling pipe every 30 stands. Monitor OA. Fluid from OA stopped completely at 05:00 hours. Total fluid from OA at approximately 30 gallons. Continuing to monitor OA while RIH with milling assembly. Tag 2-3/8" liner at 9482'. 06:30 - 08:00 1.50 CLEAN P DECOMP Break circulation at 260 gpm with 1200 psi. Up weight 195k, , down 145k, RT 165k. Torque at 7k with 80 rpm. Set depth with ' MWD. MAD pass from 9482' to 9328' at 180 fpm. I 08:00 - 10:00 2.00 CLEAN P DECOMP Pump 45 bbl hi-vis sweep with 1 drum Steel Lube. Displace ', well with 8.4 ppg Flo-Pro mud at 260 gpm with 1050 psi. I 10:00 - 11:00 1.00 CLEAN P DECOMP POOH to 7374'. Function bag and both rams prior to POOH to ~~ purge cavities of cuttings. ~ 11:00 - 12:30 1.50 CLEAN P DECOMP PJSM. Pick up and make up 7" RTTS, DP sinqle and XO. Set at 31'. Break and lay down single and packer stinger. Close blinds and test from above to 1000 psi for 10 minutes. Test OK. Blow down lines and suck out BOP stack. 12:30 - 16:30 4.00 CLEAN P DECOMP Stage dry hole tree and new tubing spool in cellar. Test otd 7" packoff to 3000 psi for 10 minutes. Test OK. Nipple down BOP stack and tubing spool. Change out main slip seal. 16:30 - 20:00 3.50 CLEAN P DECOMP Nipple up new tubing spool and packoff. Test to 3000 psi for 30 minutes. Test OK. Clean up ceilar. NU BOP stack. 20:00 - 20:30 0.50 CLEAN P DECOMP Test BOP and tubing spool flanges to 250 psi low, 3500 psi high as per AOGCC. Test witness waived by Jeff Jones with AOGCC. 20:30 - 21:00 0.50 CLEAN P DECOMP Make up running tool. Run in and release RTTS. POOH and lay down. 21:00 - 22:00 1.00 CLEAN P DECOMP RIH to 9421'. Instali blower hose. 22:00 - 00:00 2.00 CLEAN P DECOMP SPR #1 pump at 9482', 2200 hours. 30/530, 45/650. Bring pumps on at 250 gpm with 1210 psi. Up weight 170k, down '~ 145k, RT 160. Torque at 3k off bottom, 4k on bottom with 80 I rpm. Mill 2-3/8" liner and cement to 9489'. 6/8/2007 00:00 - 08:00 8.00 CLEAN P DECOMP Mili ahead to 9523'. Up weight 170k, down 147k, RT 160k. Pumping at 245 gpm with 1100-1400 psi. WOB 4-15k. Torque 3-7k at 90-100 rpm. Minimai metal back with cement. Printed: 7/10/2007 11:50:20 AM ~ ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/8/2007 08:00 - 10:00 2.00 CLEAN P DECOMP Circulate a hi-vis sweep surFace to surface at 250 gpm with 1270 psi. No increase in cuttings to surface. Pump dry job. Blow down top drive. Mud weight in and out 8.4 ppg. 10:00 - 14:00 4.00 CLEAN P DECOMP POOH to 364'. 14:00 - 16:30 2.50 CLEAN P DECOMP PJSM. Break and lay down jars, bumper sub, junk baskets and bit sub. Clean out junk baskets. Recovered cement with fine flakes of inetal. Download MWD. Break and lay down mill and float sub. Pull probe. Break and lay down MWD tools. Clear and clean floor. 16:30 - 21:00 4.50 STWHIP P WEXIT PJSM. PU single of HWDP and build mill assembly. Lay down mill assembly. PU whipstock and 7' space out pup with XO and set in table. PU mill assembly. Make up float sub, DM collar and MWO. Scribe offset. Install probe in TM coltar and make up to MWD. Upioad MWD. Break out TM collar and check allignment of errosion cap. Make back up. Plug back in and upload. Make up bumper sub and driil coliars. PU and RIH with 12 singles of HW DP. Noticed scale in second to last joint. Hammered scale out of pipe. Pulied last joint ran and hammered out scale, ran back in hole. Ran second to last joint in hole. Hammered out scale from last joint on skate and ran in hole. Three of the 15 joints of HW DP on location were not run on last well. 21:00 - 22:30 1.50 STWHIP P WEXIT Pull and rack back 4 stands of HWDP. Make up XO on top drive. Pick up each stand and hammer pipe. Screw into and pump through each stand taking retums into the flow line. After hammering and pumping through each stand, make stand up to drill string and RIH. After perfroming this procedure on ali 4 stands, RIH with first stand of DP to 765'. Surface test MWD. Test OK. 22:30 - 00:00 1.50 STWHIP P WEXIT RIH to 3101'. 6/9/2007 00:00 - 02:30 2.50 STWHIP P WEXIT RIH with whipstock/mill assembly to 6369' filling every 30 stands and testing MWD. Filied at 30 stands and tested MWD with 850 psi. Test OK. Filling on stand 60 string pressured up from 1500 psi to 3000 psi. Returns dropped to 5%. Shut down and returns stopped. Bled off and attempted to pump again. At 15 strokes pressured up to 3000 psi again with no returns. String plugged off. Bleed off and blow down. Prepare to POON. 02:30 - 03:30 1.00 STWHIP N DPRB WEXIT POOH with 10 stands. 03:30 - 04:00 0.50 STWHIP N DPRB WEXIT Make up top drive. Attempt to pump and surge pipe as per Baker Rep. Still pressuring up to 3000 psi with minimal returns. Attempt several times to unplug string with no success. Blow down top drive. 04:00 - 07:00 3.00 STWHIP N DPRB WEXIT POOH with whipstocWmill assembly. Change out handling equipment. Clean floor. 07:00 - 11:30 4.50 STWHIP N DPRB WEXIT PJSM. Stand back HWDP and coliars. Break MWD and remaining BHA to whipstock. Inspect for blockage. Jets on bottom mill lu ed with teflon s acers from MWD. Break bit and remove material blocking bit. Lay down DM collar and PU new tools for next run. 11:30 - 15:30 4.00 STWHIP N DPRB WEXIT PJSM. Instali float in bit sub. Make up bottom mill to bit sub. Clear and clean floor. PU new TM collar. PU whipstock and set in hole. Make up mills and single of HWDP. MU MWD tools. Scribe offset. Plug in and upload MW D. Make up bumper sub. Printed: 7/10/2007 11:50:20 AM ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS ~' Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/9/2007 11:30 - 15:30 4.00 STWHIP N DPRB WEXIT RIH with HWDP, drill coilars and first stand of DP to 855'. Flow test MWD at 250 gpm with 530 psi. Test OK. 15:30 - 18:00 2.50 STWHIP N DPRB WEXIT RIH to 6369'. Fill pipe and test MWD every 30 stands. 18:00 - 19:30 1.50 STWHIP P WEXIT Continue to RIH to 9445'. Pull air slips. 19:30 - 20:30 1.00 STWHIP P WEXIT Break circulation and orient to 50 degrees left. Install blower hose. PU single of DP. Make up last stand. Up weight 170k, down 150k. Wash down and tag at 9523'. Set anchor at 135k down. Confirm set with 180k up. Shear lug with 115k down. Whi stock set at 53 degrees LHS. SPR's #1 30/500, 45/590, #2 30/480, 45/560. Both at 2100 hours at 9498'. ~~~ ~ ~ ~ OK. Bleed off and blow down kili line. Mill window to 9506'! Torque 4k off bottom, 5-8k on bottom with 100 rpm.`~ump at 250 gpm with 1300 psi. WOB 2-5k. RT weight 163k, 6/10/2007 00:00 - 04:30 4.50 STWHIP P WEXIT Mill 6" window in 7" casing to 9525' MD. Pump at 299 gpm with 1748 psi on bottom 1630 psi off bottom.. Torque off bottom 3-4k, on bottom 5-8k at 115 rpm. WOB 2-24k. Good cement behind casing while milling window. Recovered 135 Ibs of metal. TOW at 9498', bottom at 9511'. Drilled 20' of new formation from middle of window to 9525'. 04:30 - 07:00 2.50 STWHIP P WEXIT Pump hi-vis super sweep surface to surface. Reciprocate and rotate through window with no probiems. Work through window without rotating with no problems. Pump second sweep surface to surface while working window. Pump at 300 gpm with 1750 psi. 07:00 - 08:00 1.00 STW HIP P W EXIT PJSM. Rack back one stand. Lay down single of DP. Perform FIT to 10.1 ppg EMW with 750 psi. Test OK. Bleed off and biow down kill ine. sta is c~rcu a ion and pump dry job at 228 gpm wtih 1220 psi. Mud weight in and out 8.4 ppg. Blow down top drive. Remove blower hose. Install air slips and wipers. 08:00 - 10:30 2.50 STWHIP P WEXIT PJSM. POOH to 738'. Remove airsiips. Change out handling equipment. Monitor well for 10 minutes - static. 10:30 - 14:30 4.00 STWHIP P WEXIT PJSM. Lay down BHA to MWD. Down~oad MWD. Clear and clean floor, Break and lay down MW D tool. Break and lay down window miil, string mill and HW DP. Mills in gauge. Clear fioor. Pick up drilling BHA tools. 14:30 - 15:30 1.00 STWHIP P WEXIT PU test joint. Pull wear ring. Make up Johnny Wacker. Flush out stack. Purge kill and choke lines. Install wear ring. Lay down test joint. 15:30 - 19:30 4.00 STWHIP P WEXIT PJSM. Pick up and make up bit, motor and MWD tools. Scribe offset and activate ABI. Make up PWD, TM collar and install probe. Plug in and upload MW D. Pick up 3 flex driil collars, ball catcher, cire sub, HWDP, jars and XO to 386'. Surtace test MWD. Test OK. 19:30 - 22:00 2.50 STWHIP P WEXIT PJSM. Pick up dritl pipe singles to 3286'. Fiil pipe and test MWD. 22:00 - 00:00 2.00 STWHIP P WEXIT RIH to 8797'. Fill pipe at 6000'. 6/11/2007 00:00 - 01:00 1.00 STWHIP P WEXIT RIH to 9451'. Fili pipe at 262 gpm wtih 1830 psi. Test MWD. Test OK. 01:00 - 03:30 2.50 S7WHIP P WEXIT PJSM. Slip and cut 117' of drilling line. Bad spot in line. Slip and cut another 135' of drilling line. Service top drive and crown. Adjust brakes. Inspect Elmago spline and draworks. Printed: 7/10/2007 17:5020 AM ~ ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS I6/11/2007 ~ 03:30 - 00:00 I 20.50I DRILL ~ P 16/12/2007 100:00 - 14:00 14:00 - 19:00 19:00 - 21:30 li 21:30 - 22:30 ' 22:30 - 00:00 ' 6/13/2007 00:00 - 00:30 00:30 - 02:00 02:00 - 02:30 02:30 - 06:00 06:00 - 07:30 14.001 DRILL I P Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES PROD1 PRODi 5.00 ~ DRILL I P I I PROD1 2.501 DRILL I P I I PROD1 1.00 I DRILL I P I I PRODi 1.50I DRILL I N I SFAL I PROD1 0.50 DRILL N SFAL PROD1 1.50 DRILL P PROD1 0.50 I DRILL I P 3.501 DRILL I P 1.501 DRILL I N PROD1 PRODi DFAL I PROD1 Make up top drive. Establish slow pump rates at 0330 hours at 9451' MD. Pump #1 30/640, 45/770. Pump #2 30/630, 45/760. Orient 50 degrees left. Shut down pump. Slide through window with no problems. Kick in pumps and directional drill ahead to 9556'. Pump at 250 gpm with 1740 psi off bottom, 1855 psi on bottom. WOB 10 to 18k. Up weight 175k, down 140k. Mud weight in and out 8.4 ppg. Continue to directionai driil ahead in build section of production hole to 9882' MD, 8837' ND. Up weight 175k, down 140k, RT 158k. Pump at 255 gpm with 1850 psi off bottom, 1970 psi on bottom. Torque 4-6k on bottom, 4-5k off bottom at 20 rpm. WOB 15-20k. SPR's #1 30/660, 45/810; #2 30/660, 45/800 at 9732'/1900 hours. Mud weight in and out 8.5 ppg. ECD at 9.62 - 9.68 ppg EMW. Directional drill ahead to 9965' MD. Pump at 250 gpm with - 1850 psi off bottom, 1930 psi on bottom. Torque 4-7k on bottom, 4-5k off bottom at 20 rpm. WOB 12-18k. Up weight 175k, down 140k, RT 155k. Mud weight 8.4+ ppg in and out. ECD 9.62-9.67 ppg EMW. SPR's at 0200 hours/9915' MD. Pump #1 30/670, 45/800. Pump #2 30/670, 45/800. Continue to drill ahead to 10069' MD, 8966' ND. Up weight 177k, down 140k, RT 155k. Torque 4-6k on bottom, 4-5k off bottom at 20 rpm. Pump at 250 gpm with 1860 psi off bottom, 2050 psi on bottom. WOB 20-25k. Pump sweeps as needed. Unable to drill. Either bit trashed or motor problem. Bring last sweep around. SPR's #1 30/700, 45/850; #2 30/690, 45/830 at 10069'/1400 hours. Monitor weil. Prepare to POOH for bit and possible motor change. Mud weight in and out 8.5 ppg. POOH through window to 9451'. No problems through window. Up weight 205k, max pull 220k. Pump dry job. Remove blower hose. Install air slips. Blow down top drive. Continue POOH to 386'. PJSM. Stand back HWDP. Break jars, retrieve corrosion ring and stand back. Lay down CCV ball catcher and cire sub. Stand back tlex collars. Download MW D. Break and lay down MWD tools and float sub. Break and lay down bit and motor. Motor shot. Strapping out came within .3' of SLM. PJSM. PU motor and bit. Install ported float. Make up MWD and nuke tools. Attempt to upioad MWD. Unable to upload. Break off TM collar and change out broken pin. MU and upload MWD. Finish uploading MWD after repair of fitting. PJSM. Surface test MWD at 250 gpm with 1040 psi. Cycle pumps. Test OK. PJSM. Clean ports and load nukes. Pick up and RIH with remaining BHA to 411'. Change out handling equipment. PJSM. RIH to 9476' filling every 30 stands and testing MWD. Tests all OK. Remove airslips. Instali blower hose. Make up top drive. Pump at 250 gpm with 2300 psi. MWD not receiving detection. Cycle pumps several times. Bring up pump rate to 260 gpm with 2406 psi. Pressure 400 to 600 psi over last off bottom pressure. Attempt to surge and bleed with no luck. Pump hi-vis sweep through tool at 250 gpm with 2490 psi while rotating and reciprocating. Attempt MWD probe test again Printed: 7/10/2007 11:5020 AM ~ ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 6/13/2007 I 06:00 - 07:30 07:30 - 10:00 10:00 - 15:30 15:30 - 19:30 19:30 - 20:30 20:30 - 21:30 21:30 - 00:00 F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO NABORS Spud Date: 12/21 /2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 1.501 DRILL I N I DFAL I PROD1 2.50I DRILL I N I DFAL I PROD1 5.50I DRIL~ ~ N I DFAL I PRODi 4.00 I DRILL I N I DFAL I PROD1 1.001 DRILL I P I I PROD1 1.00 I DRILL I P I I PROD1 2.501 DRILL I P I I PROD1 6/14/2007 I00:00 - 00:00 I 24.00 I DRILL I P I I PROD1 I6/15/2007 ~ 00:00 - 00:00 I 24.001 DRILL I P I I PROD1 with no luck. Pump slug. Remove blower hose. Prepare to POOH. Up weight 180k, down 145k, RT 155k. Mud weight in and out 8.5+ ppg. POOH to 411'. Change out handiing equipment. Monitor well - static. PJSM. Rack back HWDP, jars and flex collars. Pull pulser from TM collar. Poppet on pulser shattered. Cleaned out pulser and rebuilt. Make up TM collar. Puli and remove nukes. Plug in and download MWD. Break and lay down PWD tool. Upload MWD. Surface test MWD with 250 gpm and 1225 psi. Test OK. Load nuke sources. Run flex driil collars. Make up CCV ball catcher, cire sub, jars and HWDP to 400'. RIH to 9465'. Fill pipe and test MWD at 30 and 60 stands. Tests OK. Make up top drive. Orient. Pull air slips. Install blower hose. Pump at 250 gpm with 1900 psi. Test MWD. Test OK. Up weight 178k, down 140k, RT 155k. Shut down pumps. Slide through window with no problems. Stop at 9584'. MAD pass from 9584' to 9524', bit depth. This logged 30' below to 30' above top of window. Log at 80 fph. Pump at 250 gpm with 1950 psi. RIH to 9933'. MU top drive. Ream last full stand and remainder of stand 104 to 10069'. Pump at 250 gpm with 2400 psi, rotating at 20 rpm with 5k torque. No problems. Directional drill ahead to 10120' MD, 8995' ND. Pump at 255 gpm with 2250 psi off bottom, 2400 psi on bottom. Torque 4-5k off bottom, 4-6k on bottom at 20 rpm. WOB 12-28k. Up weight 180k, down 140k, RT 159k. SPR's at 2340 hours/10120'. Pump #1 30/750, 45/950, pump #2 30/720, 45/900. Mud weight in and out 8.5+. Directional drill ahead to 10402'. Pumping at 250 gpm with 2240 psi off bottom, 2360 psi on bottom. Torque 4-5k off bottom, 5-6k on bottom at 20 rpm. WOB 12-30k. Up weight 180k, down 140k, RT 155k. Mud weight in and out 8.5 ppg. SPR's at 0830 hours, 10402' MD. Pump #1 30/710, 45/880. Pump #2 30/700, 45/870. Mud weight in and out 8.5 ppg. Continue to directional drifl ahead to 10487' MD, 9041' ND. Pump at 250 gpm with 2200 psi off bottom, 2370 psi on bottom. Torque 4-5k off bottom, 5-7k on bottom at 20 rpm. WOB 12-40k. Up weight 180k, down 140k, RT 155k. SPR's at 10487', 2400 hours. Pump #1 30/710, 45/880. Pump #2 30/700, 45/870. Mud weight in and out 8.6 ppg. Directional drill ahead to 10681'. Pump at 245 gpm with 2370 psi off bottom, 2427 psi on bottom. Torque 4-5k off bottom, 5-7k on bottom at 60 rpm. Up weight 180k, down 140k, RT 155k. SPR's at 0130 hours, 10496'. Pump #1 30/740, 45/910. Pump #2 30/710, 45/890. Mud weight in and out 8.6 ppg. Continue to dirctional drill ahead to 10959' MD, 9013' TVD. Pump at 250 gpm with 2220 psi off bottom, 2367 psi on bottom. Torque 5-6k off bottom, 7-8k on bottom at 80 rpm. WOB 19 to 25k. Mud weight in and out 8.6 ppg. SPR's at 1930 hours/10866'. Pump #1 30/750, 45/930. Pump #2 30/740, 45/940. Up weight 180k, down 130k, RT 155k. Printed: 7/10/2007 11:5020 AM ~ ~ Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: 6/16/2007 I 00:00 - 09:30 09:30 - 10:30 10:30 - 14:30 14:30 - 17:00 17:00 - 00:00 6/17/2007 00:00 - 00:30 00:30 - 03:00 03:00 - 06:30 06:30 - 07:30 07:30 - 08:00 08:00 - 09:30 09:30 - 00:00 6/18/2007 I 00:00 - 05:00 F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS Spud Date: 12/21 /2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 9.50I DRILL I P I I PROD1 1.00 ~ DRILL I P I I PROD1 4.00 I DRILL I P I I PROD1 2.50I DRILL I P I I PROD1 7.001 BOPSUFi P I I PROD1 0.50 DRILL P 2.50 DRILL P 3.501 DRILL I P 1.00 ORILL P 0.50 DRILL P 1.50 DRILL P 14.501 DRILL I P 5.001 DRILL I P PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 Directional drill ahead to 11193' MD, 9021' ND. Pump at 250 gpm with 2470 psi off bottom, 2530 psi on bottom. Torque 5k off bottom, 6-7k on bottom at 80 rpm. WOB 20-40k. Up weight 175k, down 130k, RT 155k. Mud weight in and out 8.7 ppg. Circulate bottoms up. Monitor weil. SPR's at 11193'/1030 hours. Pump #1 30/790, 45/960. Pump #2 30/780, 45/960. Mud weight in and out 8.7 ppg. PJSM. POOH above window to 9371' with no probiems. Monitor well - OK. Pump dry job. Remove blower hose. Blow down top drive. Up 185k, down 140k. POOH to 400'. Change out handling equipment. Monitor well -OK. PJSM. Rack back HWDP and fiex collars. Remove nuke sources. Flush BHA with fresh water. Plug in MWD, turn off tool for download in shed. Lay down BHA to motor. Drain motor and break bit. Clean and clear floor. Pick up test joint and remove wear ring. Make up TIW dart valve. Install test plug. Fill stack with fresh water and check for leaks. Fiil choke line. PJSM. Test BOPE and Hydril to 250 psi low, 3500 psi high as per AOGCC. Test witness waived by Chuck Scheve with AOGCC. Test witnessed by Mitch Skinner BP WSL and John Castle ND TP. Test 4" and 4-1/2" test joints. Rig down 4-1/2" test joint. Pull test plug. Install wear ring. Break out TIW and lay down test joint. Blow down choke and kill line. Ciear and clean fioor. Finish blowing down surface lines and clearing floor. PJSM. Make up 6" PDC bit and 5" motor. PU float sub, RLL, nuke tool, DM coliar and TM collar. Surface test MWD. Test OK. Load nuke sources and R1H with drill collars, cire sub, HWDP and jars. Change out handling equipment. PJSM. RIH fiiling every 30 stands. Fill at 30 and 60 stands and test MWD. Tests OK. Continue to RIH to 9466'. PJSM. Slip and cut 80' of drilling line. PJSM. Service top drive. Lubricate rig. PJSM. Slide through window with no problems. RIH to 10495'. Wash and work down to 10590', pumping at 150 gpm with 1600 psi. Rotate at 20 rpm with 5-11 k torque. RIH to 11193'. Directionai drill ahead to 11331' MD, 9023' ND. ABI not working. Pump at 255 gpm with 2290 psi off bottom, 2500 psi on bottom. Torque 5k off bottom, 6-7k on bottom at 60 rpm. WOB 5-6k. Mud weight in and out 8.7 ppg. Up weight 180k, down 130k, RT 155k. SPR's at 1000 hours/11238'. Pump #1 30/740, 45/870. Pump #2 30/740, 45/870. Continue to drill ahead to 11760' MD, 9027' TVD. Pump at 260 gpm with 2240 psi off bottom, 2476 psi on bottom. Torque 4-5k off bottom, 5-6k on bottom at 80 rpm. WOB 5-7k. Mud weight in and out 8.6+ ppg. Up weight 180k, down 130k, RT 155k. SPR's at 2350 hours/11760'. Pump #1 30/690, 45/810. Pump #2 30/660, 45/800. Directional driil ahead to TD at 12040' MD, 9046' TVD. Pump at 260 gpm with 2240 psi off bottom, 2410 psi on bottom. Torque 5-6k off bottom, 6-7k on bottom at 80 rpm. WOB 3-6k. Up weight 185k, down weight 120k, RT 155k. Mud weight in and out 8.7 ppg. Printed: 7/10/2007 11:5020 AM ~ ~ ~Legal Well Name: F-09 ICommon Well Name: F-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS DRILLING CO. Rig Name: NABORS 16/18/2007 105:00 - 06:30 I 1.501 DRILL I P 06:30 - 07:30 I 1.001 DRILL I P 07:30 - 08:30 I 1.00 I DRILL I P 08:30 - 13:30 I 5.001 DRILL I P 13:30 - 16:30 I 3.00 I DRILL I P 16:30 - 17:00 0.50 DRILL P 17:00 - 18:00 1.00 DRILL P 18:00 - 19:00 I 1.00 I DRILL I P 19:00 - 22:00 ~ 3.00 I DRILL I P 22:00 - 00:00 I 2.001 DRILL I P 6/19/2007 00:00 - 01:30 1.50 DRILL P 01:30 - 02:30 1.00 CASE P 02:30 - 04:00 1.50 CASE P 04:00 - 10:00 I 6.001 CASE I P 10:00 - 10:30 I 0.501 CASE I P 10:30 - 12:00 I 1.501 CASE I P 12:00 - 13:00 I 1.001 CEMT I P 13:00 - 14:30 I 1.501 CEMT I P Spud Date: 12/21 /2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES PRODi Circulate sweep surface to surface. Cuttings increase of 10% both on BU and sweep. Monitor well - static. Mud weight in and out 8.7 ppg. PROD1 PJSM. Wiper trip to 11054' and back to bottom with no problems. PROD1 Circulate bottoms up at 265 gpm with 2210 psi. Hole clean. Monitor well. Mud weight in and out 8.7 ppg. PROD1 PJSM. Pump out of hole to 10497'. Hole packing off at 10560' to 10497'. Wash and ream at 175 gpm with 1350 psi. Torque at 5-10k with 40 rpm. Continue to wash and ream from 10497' to 10310'. Up weight 180k, down 145k, RT 155k at 10404'. Attempt to run back to bottom without success. Wash and ream back to 10590'. Break out topdrive. POOH to 10310' with occasional overpulis of 10-15k. PRODi MAD pass from 10310' to 9560'. Pump at 260 gpm with 2050 psi and 20 rpm. Pull at 360 fph max. PROD1 PJSM. RIH to 10590' with no problems. PROD1 POOH to 9466', just above window with no problems. Drop bail to open cire sub. MU top drive. PROD1 Pump ball down at 80 gpm with 547 psi. Open cire sub at 2100 psi. Bring up bump rate to 400 gpm with 1506 psi. Circutate bottoms up while rotating and reciprocating pipe at 45 rpm untii clean as per Mud Engineer. Pump dry job. Blow down top drive. Remove blower hose. Mud weight in and out 8.7 ppg. PROD1 POOH to 402'. Monitor well - static. Change out handiing equipment. PROD1 PJSM. Lay down BHA to nuke sources. Unload sources. Pick up to RLL and turn off tool. Come down and make up XO. Flush BHA with fresh water. PROD1 Finishing laying down BHA. Clear and clean floor. RUNPRD PJSM. Pick up casing tools. Rig up to run liner. RUNPRD -M/U Shoe track And Check Float equipment, O.K. -M/U a total of 48 joints of 4 1/2" 12.6# L-80 IBT-M Liner -M/U BOT HMC Liner Hanger, ZXP LTP and running tools -avg make-up 3900 ft/Ibs -Best- O-Life 2000 thread compound RUNPRD Run 4-1/2" liner in hole on 4" drill pipe at 1 minute per stand to 7" window at 9458'. RUNPRD CBU ~ Shoe -Stage up to 250 gpm ~ 840 psi RUNPRD Run 4-1/2" liner in hole on 4" drill pipe at 1 minute per stand - No Problems Running In - PUW = 175k SOW = 135k RUNPRD Break Circ Hole packinq off, reciprocated pioe to aet aood circulation Staged up to 5 bpm / 1250 psi - PUW = 195k SOW= 125k - PJSM with Dowell Schiumberger cementers and rig crew RUNPRD Pump 5 bbl water to cement head, test lines to 4000 psi, Good Test Pump 30 bbl MudPush II at 11.8 ppg. Mix and pump 63 bbl of 15.8 ppg class "G" tail at 5 BPM. Pump 5 bbi water to clear lines through tee back to flow line Printed: 7/10/2007 17:50:20 AM ~ ~ Legal Well Name: F-09 Common Well Name: F-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS DRILLING CO Rig Name: NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/19/2007 13:00 - 14:30 1.50 CEMT P RUNPRD Drop Plug, Kick out plug with Perf-Pill Pump 30 bbls Perf-Pill followed by 93 bbls 8.5 ppg Flo-Pro mud. Slow down pump rate as requested by Baker hand while latching up dart to wiper plug at 1528 strokes. Bump plug with 2034 strokes Pressure up to 4000 psi to set hanger or as directed by Baker rep. Slack off 50k to confirm hanger is set. Bleed pressure and check floats. Set Packer and Verify Set CIP ~ 14:30 hrs 14:30 - 15:00 0.50 CEMT P RUNPRD Bring Pump up 1000 psi and unsting from Liner Circ. @ 419 gpm / 1950 psi 45 bbls back to surface & 30 bbls of Mud Push 15:00 - 15:30 0.50 CEMT P RUNPRD UD Cement Head 15:30 - 18:00 2.50 CEMT P RUNPRD Pump Weighted Sweep ~ 313 gpm / 1300 psi, followed by Seawater ~ 402 gpm / 1340 psi -Clean Surface Equip. , -Clean Seawater Surface to Surface I 18:00 - 19:30 1.50 CEMT P RUNPRD POH with 4" DP ' 19:30 - 21:00 1.50 CEMT P RUNPRD Slip and Cut Drilling Line , Service Draw Works and Crown Sheaves ' 21:00 - 00:00 3.00 CEMT P RUNPRD POH with 4" DP ' - UD BOT Running Tool and Third Party Equipment 6/20/2007 00:00 - 01:30 1.50 CEMT P RUNPRD PJSM, Conduct Thorough Derrick Inspection ', - checking all cables, sheaves, guides, safety clamps derrick , pins, TDS, Traveling Block and Torque Tube I 01:30 - 02:30 1.00 CEMT P RUNPRD Test Liner and Liner Top ~I -PJSM, Rig up Chart and sensors ~i -Test to 3500 psi for 30 min., Good Test I 02:30 - 03:00 0.50 PERFO P OTHCMP Prepare Floor to run DPC Perf. Guns ', -Load Guns in Pipe Shed I 03:00 - 03:30 0.50 PERFO P OTHCMP Conduct PreJob Safety Meeting with Schlumberger Perforating I Techs. and NAD Rig Crew Reviewed Procedure and safe handling practices with DPC I Guns I 03:30 - 04:30 1.00 PERFO P OTHCMP P/U 656' of Perf. Guns , 2 7/8" HSD 6 SPF / 60deg. Spacing II with I eFire / HDF Firing Head ' 04:30 - 06:30 2.00 PERFO P OTHCMP Pick up 43 Joints of 2 7/8" Pac Pipe 06:30 - 07:00 0.50 PERFO P OTHCMP Change Handling Equipment and RIH with 4" HT DP I 07:00 - 10:00 3.00 PERFO P OTHCMP RIH to 11,261 with 4" DP, Tag Landing Collar I Pull up to 11,195 and put Guns on Depth 10:00 - 11:00 1.00 I PERFOBI P OTHCMP Initiate Schlumberger eFire sequence and Fire Guns -Good Indication Guns Fired OTHCMP POH From 11,195 to 10,416 OTHCMP CBU ~ 267gpm / 1820 psi OTHCMP Lay Down 4" Drill Pipe OTHCMP Lay Down 2 7/8" Drill Pipe OTHCMP PreJob Safety Meeting with Schlumberger Perforating Techs. and NAD Rig Crew Reviewed Procedure and safe handling practices with DPC 11:00 - 11:30 0.50 PERFO P 11:30 - 12:30 1.00 PERFO P 12:30 - 21:00 8.50 PERFO P 21:00 - 00:00 3.00 PERFO P 6/21/2007 00:00 - 03:00 3.00 PERFO P Printed: 7/10/2007 11:50:20 AM ~ ~ Legal Well Name: Common Well Name ' Event Name: ~~ Contractor Name: ', Rig Name: F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 16/21/2007 00:00 - 03:00 3.00 PERFO P OTHCMP Guns ~!, -UD 31 Guns Ali Shots Fire I Perforation Depths -10560 to 10630 ~ ~ -10650 to 10680 I ~ -10700 to 10840 I -11080 to 11195 li 03:00 - 03:30 0.50 RUNCO RUNCMP Pull Wear Bushing 03:30 - 06:00 2.50 RUNCO RUNCMP PJSM on Rigging Up Tubing Handling Equipment Rig Up Floor For Tubing Running Operation Rig up Tubular Handling Equipment 06:00 - 07:00 1.00 RUNCO SFAL RUNCMP Repair Seal failure on Top Drive Gripper 07:00 - 08:00 1.00 RUNCO RUNCMP PJSM on Running 4 1/2" Cr-80 12.6# Tubing and Completion equipment with NAD rig crew, NAD casing crew and BOT Toolhand 08:00 - 08:30 0.50 RUNCO SFAL RUNCMP Replace sheared bolt on Top Drive (Bolt secured with safety wire) 08:30 - 19:30 11.00 RUNCO RUNCMP Run a total of 218 jts of 4 1/2" 12.6# CR-80 VAM-TOP Tubing Torque Tum, Avg. make up 4460 Wlbs Jet Lube Seal Guard for thread compound 4.5" WLEG 9CR 4.5" TCII Tubing Pup XN Nipple (3.725" bore) 4.5" 12.6# 13Cr-80 XO pup Vam Top box x TCII pin 1 jt (#1) Jts 4.5" 12.6" 13Cr-80 Vam Top tubing 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin 4-1/2" HES X Nipple 9Cr 3.813" Pkg Bore 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin Baker S-3 7"x 4.5" Packer TCII Box x Pin 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin 4-1/2" HES X Nipple 9Cr 3.813" Pkg Bore 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 71 jts (#2-72) Jts 4.5" 12.6" 13Cr-80 Vam Top tubing 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin GLM #1 4.5"x1.5" KBG2-1 R 9Cr w/DCK Shear / BEK 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 66 jts (#73-138) Jts 4.5" 12.6" 13Cr-80 Vam Top tubing 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin GLM #2 4.5"x 1.5" MMG 9Cr w/DV BK Latch 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 28 jts (#139-166) Jts 4.5" 12.6" 13Cr-80 Vam Top tubing 4.5" 12.6# 13 Cr-80 XO pup TCII box x Vam Top pin 4.5" HES X Nipple 9Cr 3.813 Pkg Bore 4.5" 12.6# 13Cr-80 XO pup jt Vam top Bx TCII P 51 Jts (#167-217) 4.5" 12.6" 13Cr-80 Vam Top tubing 1 PUP Jt 4.5" 12.6# 13Cr Vam Top Tubing 1 jt (#218) Jts 4.5" 12.6" 13Cr-80 Vam Top tubing 4.5" 12.6# 13Cr XO TCII Pin x Vam Top Pin CIW Tubing Hanger 13 5/8" x 4.5" 12.6# TCII Bx6 Swallow in TBR = 5.65' Printed: 7/10/2007 11:5020 AM ~ • Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: F-09 F-09 REENTER+COMPLETE NABORS DRILLING CO. NABORS Spud Date: 12/21/2001 Start: 6/2/2007 End: 6/22/2007 Rig Release: 6/22/2007 Rig Number: 2ES 6/21/2007 08:30 - 19:30 11.00 RUNCO RUNCMP Tag NoGo in TBR ~ 9339.9', Spaced out with 3.81 pup, PUW = 130k / SOW=110k 19:30 - 20:00 0.50 RUNCO RUNCMP M/U Landing Joint and Hanger -RIH and Land -Run in Lock Down Screws -Rig Up Ce~lar to Reverse Circ. 20:00 - 00:00 4.00 RUNCO RUNCMP Reverse Circulate Surface to Surface with Clean Brine -pump 64 bbls of corrision inhibited seawater -pump 108 bbls on seawater without inhibitor 3 bpm / 230 psi Clear Floor and Change out long bales 6/22/2007 00:00 - 02:30 2.50 RUNCO RUNCMP Drop bali and rod and allow to fall to RHC plug in XN nipple -LD landing joint and close blind shear rams. -Pressure up on the tubing to 3500 psi for 30 min and record on chart for tubing test. Good Test -Bleed the pressure down to 1500 psi. -Pressure annulus to 3500 psi for 30 minutes and record on chart. Good Test - Bleed off the annular pressure first, then the tubing pressure to 0 psi. Pressure annulus to 2500 psi to shear the DCK-2 valve in GLM #1. Pump a couple bbls each way through the sheared GLM to confirm ability to pump and U-tube freeze protect diesel. 02:30 - 03:00 0.50 BOPSU P RUNCMP Dry Rod Two Way Check and test to 1000 psi from above and below Good Tests 03:00 - 05:00 2.00 BOPSU P RUNCMP Change Rams to 7" and Nipple down Stack 05:00 - 06:30 1.50 WHSUR P RUNCMP Nipple up Adaptor Flange and Tree 06:30 - 09:00 2.50 WHSUR P RUNCMP Test Adaptor Flange and Tree to 5000 psi, bleeding off - retighten bolts and function vaives Retest to 5000 psi for 30 min., good test 09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up Drili Site Maintenance lubricator and pull TWC 10:00 - 13:00 3.00 WHSUR P RUNCMP Rig Little Red Pumping Services and Pump 72 bbl of Dies I~ 2 bpm / 1000 psi -U-Tube diesel to tubing -Remove secondary annulus valves , install flanges and needle valves,and gauges 13:00 - 14:00 1.00 WHSUR P RUNCMP Prepare cellar, Secure well Release Rig ~ 14:00 hrs 6/22/2007 Printed: 7/10/2007 17:50:20 AM . ~ #~~ ~ ~ ~ ~, «~ Halliburton Company ~ ~~~=3 ~~ ~ , 4 ,~ Survey Report ~`~~ ~ ` ~" ` ~ Company: BP Amoco Date: 7/19/2007 Time: 01:~5:29 P.age: 1 Field: Prudhoe Bay Co-ardinate(NE) Reference,: ' WeIIs.F-p9, True North Site: PB F Pad Verticat (T'C~II~) Lteference: ' F-Q96: 65.0 We1L• F-09 - Section (~S) Reference: Welt (Q.40N,O.fJ0E;250.31'Azi) Wellgath:~ F-~98:~ ~ Survey Calculationlyi~thod: ~~~ Minimurn Curvature ' Db: Or~cle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Pla ne Coordinate System 1 927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Well: F-09 Slot Name: 09 i F-09 ~ Well Position: +N/-S 1784.41 ft Northing: 5974332.00 ft Latitude: 70 20 12.832 N +E/-W 1033.49 ft Easting : 651958.00 ft Longitude: 148 46 1.285 W Position Uncertainty: 0.00 ft I Weilpath: F-09B Drilled From: F-09 500292040302 Tie-on Depth: 9472.69 ft Current Datum: F-09B : Height 64.99 ft Above System Datum: Mean Sea Level Magnetic Data: 6/7/2007 Declination: 23.73 deg Field Strength: 57649 nT Mag Dip Angle: 80.92 deg Vertical Secfion: Depth From (TVD) +N/-S +E/-W Direc tion ft ft ft deg 28.50 0.00 0.00 250.31 Survey Program £or De~nitive Wellpath Date: 7/19/2007 Validated: No Version: 9 Actual From To Survey Toolcode Tool Name ft ft 97.69 9472.69 F-09 Gyrodata cont.drillpipe ( GYD-CT-CMS Gyrodata cont.casing m/s 9498.00 11944.32 F-09B IIFR+MS+Sag (9498.00-119 MWD+IFR+MS MWD + IFR + Multi Station Survey MD '' Incl Azim T~'D 5ys TF~D > N/S E/W MapN MapE Tool ! ft deg deg ft ft ft ft ft ' fit 28.50 0.00 0.00 28.50 -36.49 0.00 0.00 5974332.00 651958.00 TIE LINE 97.69 0.22 261.69 97.69 32.70 -0.02 -0.13 5974331.98 651957.87 GYD-CT-CMS 197.69 0.43 223.83 197.69 132J0 -0.32 -0.58 5974331.67 651957.42 GYD-CT-CMS 297.69 0.58 218.10 297.68 232.69 -0.99 -1.15 5974330.99 651956.87 GYD-CT-CMS 397.69 0.75 216.85 397.68 332.69 -1.91 -1.86 5974330.05 651956.18 GYD-CT-CMS 497.69 1.01 203.36 497.67 432.68 -3.24 -2.60 5974328.71 651955.47 GYD-CT-CMS 597.69 1.22 193.93 597.65 532.66 -5.08 -3.21 5974326.85 651954.90 GYD-CT-CMS 697.69 1.30 191.10 697.62 632.63 -7.23 -3.68 5974324.70 651954.47 GYD-CT-CMS 797.69 1.33 189.08 797.60 732.61 -9.49 -4.08 5974322.43 651954.11 GYD-CT-CMS 897.69 1.21 186.17 897.57 832.58 -11.69 -4.38 5974320.23 651953.86 GYD-C7-CMS 997.69 0.72 184.98 997.56 932.57 -13.36 -4.55 5974318.55 651953.72 GYD-CT-CMS 1097.69 0.30 179.13 1097.55 1032.56 -14.25 -4.60 5974317.66 651953.69 GYD-CT-CMS 1197.69 0.33 90.76 1197.55 1132.56 -14.51 -4.31 5974317.40 651953.99 GYD-CT-CMS 1297.69 0.39 50.92 1297.55 1232.56 -14.30 -3.75 5974317.62 651954.54 GYD-CT-CMS 1397.69 0.36 56.60 1397.55 1332.56 -13.92 -3.23 5974318.02 651955.06 GYD-CT-CMS 1497.69 0.25 59.94 1497.55 1432.56 -13.63 -2.78 5974318.31 651955.50 GYO-CT-CMS 1597.69 0.32 129.15 1597.55 1532.56 -13.70 -2.37 5974318.26 651955.91 GYD-CT-CMS 1697.69 0.55 157.22 1697.54 1632.55 -14.32 -1.97 5974317.64 651956.32 GYD-CT-CMS 1797.69 0.65 153.79 1797.54 1732.55 -15.27 -1.53 5974316.70 651956.78 GYD-CT-CMS i 1897.69 0.69 148.06 1897.53 1832.54 -16.29 -0.96 5974315.69 651957.37 GYD-CT-CMS I 1997.69 0.93 106.38 1997.52 1932.53 -17.03 0.13 5974314.95 651958.48 GYD-CT-CMS 2097.69 1.83 67.97 2097.49 2032.50 -16.66 2.39 5974315.39 651960.73 GYD-CT-CMS 2197.69 2.48 62.63 2197.42 2132.43 -15.07 5.79 5974317.05 651964.10 GYD-CT-CMS 2297.69 2.65 69.71 2297.32 2232.33 -13.27 9.88 5974318.93 651968.15 GYD-CT-CMS 2397.69 2.64 87.52 2397.22 2332.23 -12.37 14.35 5974319.93 651972.60 GYD-CT-CMS 2497.69 2.43 116.86 2497.12 2432.13 -13.23 18.55 5974319.15 651976.81 GYD-CT-CMS 2597.69 2.38 146.36 2597.04 2532.05 -15.91 21.59 5974316.53 651979.90 GYD-CT-CMS 2697.69 2.35 155.65 2696.95 2631.96 -19.51 23.58 59743t2.97 65198i.97 GYD-CT-CMS 2797.69 3.03 202.95 2796.86 2731.87 -23.81 23.40 5974308.67 651981.87 GYD-CT-CMS ~v~--C~i 3 . ~ - Halliburton Company ~ , A ~ ~ ,; ~ Survey Report Company: BP Amoco Date: 7/19/2407 ` Time; 01:35:29 Page: ,` 2 Field: Prudhoe Bay Co-ordinate(NE) Refecence: W211: F-d9, True'North Site: PB F Pad Verticat (TVD} Reference: ' F-09B: 65A Weit: F-09 Section (VSj Reference: , Well (Q;'40h1,0.4QE,250.31'Azi) ~Vellpath:<~~ F-09B'~ ~ ~ ~ ~ Survey Calculatian MgU~od: ' Minimum Curvalure ` Db: Oracle ~~~ Survey MD Incl Azim TVD Sys TVD N/5 E/4V MapN MapE Tool : ft ` deg deg ft ft ft ft' ft ft i 2897.69 5.04 220.39 2896.61 2831.62 -29.59 19.52 5974302.81 651978.11 GYD-CT-CMS i i 2997.69 7.96 225.39 2995.95 2930.96 -37.80 11.74 5974294.45 651970.51 GYD-CT-CMS 3097.69 9.33 229.93 3094.82 3029.83 -47.88 0.61 5974284.14 651959.58 GYD-CT-CMS 3197.69 10.60 230.17 3193.30 3128.31 -58.99 -12.66 5974272.77 651946.54 GYD-CT-CMS 3297.69 12.22 230.45 3291.33 3226.34 -71.62 -27.88 5974259.83 651931.58 GYD-CT-CMS 3322.69 12.64 230.62 3315.74 3250.75 -75.04 -32.04 5974256.33 651927.49 GYD-CT-CMS 3347.69 13.08 230.89 3340.11 3275.12 -78.56 -36.35 5974252.72 651923.26 GYD-CT-CMS 3372.69 13.53 231.15 3364.44 3299.45 -82.18 -40.82 5974249.01 651918.86 GYD-CT-CMS 3397.69 13.98 231.42 3388.72 3323.73 -85.90 -45.46 5974245.20 651914.30 GYD-CT-CMS 3422.69 14.41 231.16 3412.96 3347.97 -89.74 -50.24 5974241.27 651909.59 GYD-CT-CMS 3447.69 14.84 231.55 3437.15 3372.16 -93.68 -55.17 5974237.23 651904.74 GYD-CT-CMS 3472.69 15.27 231.43 3461.29 3396.30 -97.72 -60.25 5974233.09 651899.74 GYD-CT-CMS 3497.69 15.70 231.80 3485.38 3420.39 -101.86 -65.48 5974228.84 651894.60 GYD-CT-CMS 3522.69 16.15 231.84 3509.43 3444.44 -106.10 -70.88 5974224.49 651889.29 GYD-CT-CMS 3547.69 16.60 231.69 3533.41 3468.42 -110.47 -76.41 5974220.02 651883.85 GYD-CT-CMS 3572.69 17.01 231.91 3557.34 3492.35 -114.94 -82.09 59174215.43 651878.26 GYD-CT-CMS 3597.69 17.61 231.78 3581.21 351622 -119.53 -87.94 5974210.72 65f872.51 GYD-CT-CMS 3622.69 18.23 231.57 3605.00 3540.01 -124.30 -93.98 5974205.83 651866.57 GYD-CT-CMS 3647.69 18.79 231.65 3628.70 3563.71 -129.23 -100.20 5974200.78 651860.45 GYD-CT-CMS 3672.69 19.36 231.36 3652.33 3587.34 -134.32 -106.59 5974195.56 651854.16 GYD-CT-CMS 3697.69 _ 20.17 231.31 3675.86 3610.87 -139.60 -113.19 5974190.15 651847.67 GYD-CT-CMS 3722.69 20.74 231.36 3699.28 3634.29 -145.06 -120.01 5974184.55 651840.96 GYD-CT-CMS 3747.69 21.40 231.47 3722.61 3657.62 -150.66 -127.04 5974178.81 651834.05 GYD-CT-CMS 3772.69 22.04 231.64 3745.84 3680.85 -156.41 -134.28 5974172.91 651826.92 GYD-CT-CMS 3797.69 22.70 231.89 3768.95 3703.96 -162.30 -141.76 5974166.87 651819.57 GYD-CT-CMS 3822.69 23.18 232.00 3791.98 3726.99 -168.31 -149.43 5974160.71 651812.02 GYD-CT-CMS 3847.69 23.64 231.99 3814.92 3749.93 -174.43 -157.26 5974154.44 651804.32 GYD-CT-CMS 3872.69 24.02 232.27 3837.79 3772.80 -180.63 -165.23 5974148.08 651796.47 GYD-CT-CMS 3897.69 24.42 232.41 3860.59 3795.60 -186.89 -173.35 5974141.65 651788.48 GYD-CT-CMS 3922.69 25.01 232.61 3883.30 3818.31 -193.25 -181.64 5974135.12 651780.32 GYO-CT-CMS 3947.69 25.57 232.68 3905.90 3840.91 -199.73 -190.13 5974128.47 651771.97 GYD-CT-CMS 3972.69 26.20 232.80 3928.39 3863.40 -206.34 -198.82 5974121.69 651763.42 GYD-CT-CMS 3997.69 26.93 232.97 3950.75 3885.76 -213.09 -207.74 5974114.76 651754.64 GYD-CT-CMS 4022.69 27.60 233.00 3972.98 3907.99 -219.98 -216.88 5974107.69 651745.64 GYD-CT-CMS 4047.69 28.20 233.41 3995.07 3930.08 -226.99 -226.25 5974100.49 651736.41 GYD-CT-CMS 4072.69 28.62 233.35 4017.06 3952.07 -234.08 -235.80 5974093.20 651727.01 GYD-CT-CMS 4097.69 28.92 233.49 4038.97 3973.98 -241.25 -245.46 5974085.84 651717.50 GYD-CT-CMS 4122.69 29.26 233.60 4060.82 3995.83 -248_48 -255.23 5934078.42 651707.87 GYD-CT-CMS 4147.69 29.61 233.88 4082.59 4017.60 -255.74 -265.14 5374070.96 651698.12 GYD-CT-CMS 4172.69 29.85 233.92 4104.30 4039.31 -263.05 -275.16 5J74063.45 651688.25 GYD-CT-CMS 4197.69 30.16 234.26 4125.95 4060.96 -270.38 -285.28 5~74055.92 651678.27 GYD-CT-CMS 4222.69 30.21 234.53 4147.56 4082.57 -277.70 -295.50 5974048.39 651668.21 GYD-CT-CMS 4247.69 30.32 234.53 4169.15 4104.16 -285.01 -305.76 5974040.88 651658.09 GYD-CT-CMS 4272.69 30.53 234.38 4190.71 412572 -292.37 -316.07 5574033.31 651647.95 GYD-CT-CMS 4297.69 30.55 234.75 4212.24 4147.25 -299.73 -326.42 59~74025.74 651637.75 GYD-CT-CMS 4322.69 30.42 234.69 4233.79 4168.80 -307.06 -336.77 5~7401820 651627.55 GYD-CT-CMS 4347.69 30.36 234.84 4255.35 4190.36 -314.36 -347.10 5974010.70 651617.37 GYD-CT-CMS 4372.69 30.47 235.11 4276.91 4211.92 -321.62 -357.46 5974003.23 651607.15 GYD-CT-CMS 4397.69 30.55 235.12 4298.45 4233.46 -328.88 -367.88 5973995.76 651596.89 GYD-CT-CMS 4422.69 30.52 235.13 4319.98 4254.99 -336.14 -378.30 5973988.29 651586.62 GYD-CT-CMS 4447.69 30.52 235.31 4341.52 4276.53 -343.38 -388.72 5973980.84 651576.34 GYD-CT-CMS ~ 4472.69 30.61 235.71 4363.05 4298.06 -350.58 -399.20 5973973.43 651566.01 GYD-CT-CMS i F t ~ ~ • \ ~~ j ~~ i' ~ ~ ?q ~ - ! +F i ., (3 `. Halliburton Company ~ &~ }~ ~~ ~`~~a~ ~ k Survey Report Gompany:: 8P Amoeo Date: 7/1912Q07 Time: 01:35;29 Page: 3 Fieid: Pru dhoe Bay Co-occli~nate(NE) Reference: ' W~II: F-p9, TrueiNprth Site: p6 F Pad ~erficai (T~?D} Reference: F- 096: 65.0 WeU: ' F-0 9 Section (VS} Reference: ' Welt (O:OON,O.OOE,250.31Azi) WQllpath: F-096 Sur~ey ~alculation Meth~d: Minimurr- Curuature Db: Oracle Survey NID Incl Azim TVD' Sys TVI? N/S ` ~/W ' MapN lkfapE Tool ft deg deg ft ' ft ft ft ft ft 4497.69 30.96 235.89 4384.52 4319.53 -357.77 -409.79 5973966.02 651555.58 GYD-CT-CMS 4522.69 31.05 236.27 4405.95 4340.96 -364.96 -420.47 5973958.62 651545.04 GYD-CT-CMS 4547.69 31.22 236.58 4427.35 4362.36 -372.11 -431.24 5973951.26 651534.42 GYD-CT-CMS 4572.69 31.24 237.16 4448.73 4383.74 -379.19 -442.10 5973943.96 651523.71 GYD-CT-CMS 4597.69 31.39 237.59 4470.09 4405.10 -386.20 -453.04 5973936.73 651512.91 GYD-CT-CMS 4622.69 31.82 237.87 4491.38 4426.39 -393.19 -464.12 5973929.51 651501.98 GYD-CT-CMS 4647.69 32.05 238.11 4512.59 4447.60 -400.20 -475.33 5973922.28 651490.91 GYD-CT-CMS 4672.69 32.11 238.31 4533.78 4468.79 -407.20 -486.62 5973915.06 651479.77 GYD-CT-CMS 4697.69 32.02 238.23 4554.96 4489.97 -414.18 -497.90 5973907.85 651468.63 GYD-CT-CMS 4722.69 32.10 238.47 4576.15 4511.16 -421.14 -509.20 5973900.66 651457.47 GYD-CT-CMS 4747.69 32.09 235.33 4597.33 4532.34 -428.10 -520.51 5973893.47 65i446.30 GYD-CT-CMS 4772.69 32.14 238.29 4618.50 4553.51 -435.08 -531.82 5973886.26 651435.14 GYD-CT-CMS 4797.69 32.09 238.58 4639.68 4574.F9 -442.04 -543.15 5973879.08 651423.96 GYD-CT-CMS 4822.69 32.11 238.67 4660.86 4595.87 -448.96 -554.49 5973871.93 651412.76 GYD-CT-CMS 4847.69 32.25 239.51 4682A2 4617.03 •455.80 -565.91 ~973864.87 651401.48 GYD-CT-CMS 4872.69 32.63 240.27 4703.11 4638.~2 -462.52 -577.51 5973857.91 651390.02 GYD-CT-CMS 4897.69 32.80 240.71 4724.15 4659.~6 -469.18 -589.27 5973851.01 651378.40 GYD-CT-CMS I 4922.69 32.86 241.06 4745.16 4680.17 -475.77 -601.11 5973844.18 651366.69 GYD-CT-CMS 4947.69 32.96 241.54 4766.14 4701.i5 -482.29 -613.03 5973837.42 651354.91 GYD-CT-CMS 4972.69 33.08 241.77 4787.11 4722.12 -488.76 -625.02 5973830.71 651343.06 GYD-CT-CMS 4997.69 33.36 241.78 4808.02 4743.(A3 -495.24 -637.09 5973823.99 651331.13 GYD-CT-CMS 5022.69 33.41 242.13 4828.90 4763.91 -501.71 -649.23 5973817.28 651319.12 GYD-CT-CMS 5047.69 33.09 242.03 4849.80 4784.8i -508.13 -661.34 5973810.62 651307.14 GYD-CT-CMS 5072.69 33.10 242.12 4870.75 4805.76 -514.52 -673.40 5973803.98 651295.21 GYD-CT-CMS 5097.69 33.02 242.19 4891.70 4826.73 -520.89 -685.46 5973797.37 651283.29 GYD-CT-CMS 5122.69 32.97 242.47 4912.67 4847.6~6 -527.21 -697.52 5973790.80 651271.36 GYD-CT-CMS 5147.69 33.22 242.41 4933.61 4868.C'a2 -533.53 -709.62 5973784.24 651259.39 GYD-CT-CMS 5172.69 33.27 242.50 4954.52 4889.53 -539.87 -721.77 5973777.66 651247.37 GYD-CT-CMS 5197.69 33.22 242.73 4975.43 4910.44 -546.17 -733.94 5973771.11 651235.33 GYD-CT-CMS I 5222.69 33.35 242.85 4996.33 4931.3~4 -552.44 -746.14 5973764.59 651223.26 GYD-CT-CMS ~ 5247.69 33.62 242.97 5017.18 4952.~~ -558.72 -758.42 5973758.06 651211.11 GYD-CT-CMS ~ 5272.69 33.47 243.31 5038.01 4973.~2 -564.97 -770.75 5973751.58 651198.92 GYD-CT-CMS 5297.69 33.47 243.79 5058.87 4993.~ -571.1 f -783.09 5973745.19 651186.70 GYD-CT-CMS 5322.69 33.87 244.15 5079.67 5014.68 -577.19 -795.54 5973738.85 651174.37 GYD-CT-CMS 5347.69 33.69 244.95 5100.45 5035.4ffi -583.16 -808.09 5973732.63 651161.95 GYD-CT-CMS 5372.69 34.43 245.35 5121.16 5056.~7 -589.05 -820.80 5973726.49 651149.36 GYD-CT-CMS 5397.69 34.60 245.41 5141.76 5076.?7 -594.95 -833.68 5973720.33 651136.61 GYD-CT-CMS 5422.69 34.62 245.70 5162.34 5097.~5 -600.82 -846.60 5973714.19 651123.81 GYD-CT-CMS 5447.69 34.67 246.09 5182.91 51i7.9l2 -606.63 -859.58 5973708.12 651110.95 GYD-CT-CMS 5472.69 34.97 246.87 5203.43 5138.~ -612.32 -872.67 5973702.16 651097.98 GYD-CT-CMS 5497.69 35.47 247.94 5223.85 5158.~ -617.86 -885.98 5973696.36 651084.79 GYD-CT-CMS 5522.69 35.73 248.41 5244.18 5179.t9 -623.27 -899.49 5973690.68 651071.39 GYD-CT-CMS 5547.69 35.80 248.49 5264.47 5199.~ -628.64 -913.08 5973685.03 651057.91 GYD-CT-CMS 5572.69 35.73 248.60 5284.75 52i9.~t6 -633.98 -926.68 5973679.42 651044.43 GYD-CT-CMS 5597.69 35.89 248.71 5305.03 5240.0,~4 -639.31 -940.30 5973673.82 651030.91 GYD-CT-CMS 5622.69 36.07 249.21 5325.26 5260.~ -644.58 -954.01 5973668.27 651017.32 GYD-CT-CMS 5647.69 36.08 249.49 5345.46 5280.47 -649J7 -967.78 5973662.80 651003.65 GYD-CT-CMS 5672.69 36.00 249.91 5365.68 5300.6~ -654.88 -981.58 5973657.42 650989.96 GYD-CT-CMS 5697.69 35.96 250.12 5385.91 5320.~ -659.90 -995.38 5973652.12 650976.27 GYD-CT-CMS 5722.69 35.94 250.49 5406.15 5341.t~& -664.84 -1009.20 5973646.89 650962.55 GYD-CT-CMS 5747.69 36.19 250.57 5426.36 5361.~~ -669.75 -1023.08 5973641.71 650948.78 GYD-CT-CMS 5772.69 36.21 250.59 5446.53 5381.54 -674.66 -1037.00 5973636.52 650934.96 GYD-CT-CMS 5797.69 36.12 250.95 5466.71 5401.7~ -679.52 -1050.93 5973631.38 650921.13 GYD-CT-CMS • • -~ ~ ~ , .~ ~~ Halliburton Company ~3 ~ ~~ ~ `~ ~ ~ '` Survey Report Gompany:-' BP AmOCO Date: 7/19/20p7 Tim,e: 01:35:29 Parge: : 4 Field: Prudhoe Bay ` Co-ordinate(NE) Referen~e: ' Well: F-09, True Notth 5ite: PB F Pad ' Vertical (TVb}-Reference: > F-096: 65:0 Well: F-09 Section (~'S} Reference« Well (O.OON,O.d0E,250.31Aaij Welipatht F-09B SurYey Calculation 1Vlethod: Minirnurtt Gurvature D~-: Oracle Survey MD Incl Azim TVD Sys TVD N/S E!W MapN MapE 'H'ool I f~ deg deg ft ft ft ft' ft ft I 5822.69 I 36.14 251.07 5486.91 5421.92 -684.31 -1064.87 5973626.30 65090729 GYD-CT-GMS 5847.69 36.09 251..29 5507.10 5442.11 -659.07 -1078.82 5973621.27 650893.45 GYD-CT-~MS . 5872.69 36.44 251.44 5527.26 5462.27 -693.79 -1092.83 5973616.26 650879.53 GYD-CT-~MS 5897.69 36.48 251.77 5547.37 5482.38 -698.48 -1106.93 5973611.29 650865.53 GYO-CT-~MS 5922.69 36.32 251.86 5567.49 5502.50 -703.11 -1121.02 5973606.37 650851.54 GYD-CT-C;MS 5947.69 35.73 250.84 5587.71 5522.72 -707.81 -1134.95 5973601.39 650837.71 GYD-CT-GMS 5972.69 34.52 248.75 5608.16 5543.17 -712.77 -1148.45 5973596.15 650824.31 GYD-CT-~MS 5997.69 33.45 246.42 5628.89 5563.90 -718.10 -1161.37 5973590.57 650811.51 GYD-CT-~MS 6022.69 32.23 243.99 5649.89 5584.90 -723J8 -1173.68 5973584.64 650799.32 GYD-CT-~MS 6047.69 31.10 242.20 5671.17 5606.18 -729.71 -1185.38 5973578.47 650787.74 GYD-CT-GMS 6072.69 29.99 239.45 5692.70 5627.79 -735.90 -1196.47 5973572.06 650776.77 GYD-CT-~MS 6097.69 29.81 236.42 5714.37 5649.38 -742.51 -1207.03 597356524 650766.35 GYD-CT-~MS 6122.69 30.43 235.29 5736.00 5671.01 -749.56 -1217.41 5973557.99 650756.11 GYD-CT-CMS 6147.69 30.63 234.51 5757.53 5692.54 -756.86 -1227.80 5973550.47 650745.88 GYD-CT-CMS 6172.69 30.74 234.63 5779.03 5714.04 -764.25 -1238.20 5973542.87 650735.63 GYD-CT-GIV1S 6197.69 31.19 234.55 5800.47 5735.48 -771.7t -1248.68 5973535.21 650725.30 GYD-CT-CMS 6222.69 31.57 234:38 5821.81 5756.82 -779.27 -1259.27 5973527.43 650714.87 GYD-CT-~NS 6247.69 32.08 234.49 5843.05 5778.06 -786.94 -1270.00 5973519.55 650704.30 GYD-CT-(~AS 6272.69 32.39 234.62 5864.20 5799.21 -794.67 -1280.86 5973511.59 650693.60 GYD-CT-f~AS 6297.69 32.47 234.05 5885.30 5820.31 -802.49 -1291.75 5973503.56 650682.87 GYD-CT-f~AS 6322.69 32.70 234:91 5906.37 5841.38 -810.31 -1302.71 5973495.52 650672.07 GYD-CT-(~AS 6347.69 33.15 233.78 5927.35 5862.36 -818.23 -1313.75 5973487.37 650661.19 GYD-CT-f:'~tAS 6372.69 33.31 234:88 5948.26 5883.27 -826.22 -1324.88 5973479.16 650650.23 GYD-CT-C1vIS 6397.69 33.53 234.42 5969.13 5904.14 -834.19 -1336.11 5973470.97 650639.16 GYD-CT-(~AS 6422.69 33.57 233.95 5989.97 5924.98 -842.27 -1347.32 5973462.66 650628.13 GYD-CT-(~AS 6447.69 33.70 235.20 6010.78 5945.79 -850.30 -1358.60 5973454.41 650617.01 GYD-CT-C:~AS 6472.69 33.68 234.01 6031.58 5966.59 -858.33 -1369.90 5973446.15 650605.87 GYD-CT-C~AS 6497.69 33.88 234.81 6052.36 5987.37 -866.42 -1381.21 5973437.83 650594.73 GYD-CT-f~AS 6522.69 33.92 234.38 6073.11 6008.12 -874.50 -1392.57 5973429.53 650583.53 GYD-CT-(:~vIS 6547.69 33.90 234.06 6093.86 6028.87 -882.65 -1403.89 5973421.15 650572.39 GYD-CT-(~AS 6572.69 33.91 235.17 6114.61 6049.62 -890.73 -1415.26 5973412.84 650561.19 GYD-CT-C~v1S 6597.69 34.12 234.08 6135.33 6070.34 -898.83 -1426.66 5973404.52 650549.95 GYD-CT-(~1S 6622.69 34.11 235.37 6156.03 6091.04 -906.92 -1438.11 5973396.19 650538.67 GYD-CT-C~AS 6647.69 34.15 234.67 6176.72 6111.73 -914.96 -1449.60 5973387.92 650527.34 GYD-CT-C~AS 6672.69 34.17 234.97 6197.41 6132.42 -923.05 -1461.07 5973379.60 650516.04 GYD-CT-f~U1S 6697.69 34.08 236.16 6218.11 6153.12 -930.98 -1472.64 5973371.44 650504.64 GYD-CT-Gl~AS 6722.69 34.37 234.77 6238.78 6173.79 -938.95 -1484.22 5973363.24 650493.22 GYD-CT-C~AS 6747.69 34.39 236.10 6259.41 6194.42 -946.96 -1495.85 5973354.99 650451.76 GYD-CT-f~NS 6772.69 34.55 235.67 6280.02 6215.03 -954.90 -1507.56 5973346.82 650470.21 GYD-CT-f~ivlS 6797.69 34.74 235.08 6300.59 6235.60 -962.97 -1519.25 5973338.51 650458.68 GYD-CT-f:~,AS 6822.69 34.71 236.72 6321.14 6256.15 -970.96 -1531.05 5973330.29 650447.05 GYD-CT-GA~AS 6847.69 34.98 235.31 6341.65 6276.66 -978.94 -1542.89 5973322.07 650435.38 GYD-CT-C~AS 6872.69 34.94 236.67 6362.14 6297.15 -986.95 -1554.76 5973313.82 650423.67 GYD-CT-G~1AS 6897.69 35.13 236.45 6382.61 6317.62 -994.86 -1566.74 5973305.67 650411.86 GYD-CT-C~NIS 6922.69 35.41 235.86 6403.02 6338.03 -1002.90 -1578.73 5973297.39 650400.03 GYD-CT-C~AS 6947.69 35.37 237.84 6423.41 6358.42 -1010.82 -1590.85 5973289.23 650388.08 GYD-CT-C~AS 6972.69 35.56 236.11 6443.77 6378.78 -1018.72 -1603.01 5973281.08 650376.08 GYD-CT-(~AS 6997.69 35.64 237.46 6464.10 6399.11 -1026.69 -1615.18 5973272.86 650364.07 GYD-CT-C~u1S 7022.69 35.85 237.55 6484.39 6419.40 -1034.54 -1627.50 5973264.77 650351.91 GYD-CT-C'~AS 7047.69 35.94 235.98 6504.64 6439.65 -1042.57 -1639.76 5973256.49 650339.82 GYD-CT-CdAAS 7072.69 35.99 237.96 6524.87 6459.88 -1050.58 -1652.07 5973248.24 650327.68 GYD-CT-C4uiS 7097.69 35.74 236.29 6545.13 6480.14 -1058.53 -1664.37 5973240.05 650315.54 GYD-CT-C~AS ~ ~ ~ ~'~'`'` `°...y E "'~ ~~. w \ ~ ~ 4, _.:. ., ~ a . \ Halliburton Company ~~ ~ ! {~ ~ ~~ ~~ Survey Report Gomgany: 8P Amocca Date: ?/19/2tl07 Time: Qt:3529 ' Fage: ' S Field: Prudhoe Bay- Go-ordinate(NE) Referen¢e: Weil: F-09, True North Site: PB F Pad Verticai (TVD) Reference: ` F-09B: 65.0 Well: F-09 Section (VS) Reference: Nfell (U.OON,O.Q~'E,250.31Aze) Weltpatht F-09B' Survey Calculafion Meth4d: Minimurn Curvature [lb: Oracle Survey MD Incl Azim TVD: Sys'FVD N/S : E/W ' MapPE MapE 3`otel : ft deg deg ` ft ft ` ft it ft ft 7122.69 35.97 236.37 6565.40 6500.41 -1066.64 -1676.56 5973231.68 650303.52 GYD-CT-CMS 7147.69 36.17 237.05 6585.60 6520.61 -1074.72 -1688.86 5973223.36 650291.39 GYD-CT~MS 7172.69 35.81 236.42 6605.83 6540.84 -1082.78 -1701.14 5973215.05 650279.27 GYD-CT-CMS 7197.69 36.18 235.68 6626.06 6561.07 -1090.99 -1713.33 5973206.60 650267.25 GYD-CT-CMS 7222.69 36.05 237.32 6646.26 658i.27 -1099.12 -1725.62 5973198.22 650255.13 GYD-CT-CMS 7247.69 35.97 235.76 6666.48 6601.49 -1107.22 -1737.88 5973189.87 650243.04 GYD-CT-CMS 7272.69 36.36 235.82 6686.66 6621.67 -1115.52 -1750.08 5973181.33 650231.01 GYD-CT-CMS 7297.69 36.28 236.62 6706.81 6641.82 -1123.75 -1762.39 5973172.85 650'218.87 GYD-CT-CMS 7322.69 36.33 234.77 6726.95 6661.96 -1132.09 -1774.61 5973164.27 650206.82 GYD-CT-CMS 7347.69 36.33 236.84 6747.09 6682.10 -1140.41 -1786.86 5973155.70 650194.74 GYD-CT~MS 7372.69 36.37 235.39 6767.23 6702.24 -1148.67 -1799.16 5973147.19 650 i 82.61 GYD-CT-CMS 7397.69 36.57 235.62 6787.33 6722.34 -1157.09 -1811.41 5973138.53 650170.54 GYD-CT-CMS 7422.69 36.69 236.10 6807.40 6742.41 -1165.46 -1823.76 5973129.91 650158.37 GYD-CT-CMS 7447.69 36.96 234.87 6827.41 6762.42 -1173.95 -1836.10 5973121.17 650146.20 GYD-CT-CMS 7472.69 36.81 236.61 6847.41 6782.42 -1182.40 -1848.50 5973112.48 650133.97 GYD-CT-CMS 7497.69 37.00 235.23 6867.40 6802.41 -1190.81 -1860.94 5973103.82 650121.71 GYD-CT-CMS 7522.69 37.00 236.41 6887.36 6822.37 -1199.26 -1873.38 5973095.11 650109.44 GYD-CT-CMS 7547.69 37.24 235.18 6907.30 6842.31 -1207.74 -1885.86 5973086.38 650097.14 GYD-CT-CMS 7572.69 37.17 237.06 6927.21 6562.22 -1216.17 -1898.41 5973077.70 650d84.77 GYD-CT-CMS 7597.69 37.21 235.32 6947.13 6882.14 -1224.58 -i910.96 5973069.04 650072.38 GYD-CT-CMS 7622.69 37.14 236.41 6967.05 6902.06 -1233.05 -1923.46 5973060.32 650(760.06 GYD-CT-CMS 7647.69 37.32 236.68 6986.95 6921.96 -1241.39 -1936.08 5973051.72 650047.61 GYD-CT-CMS 7672.69 37.23 235.58 7006.85 6941.86 -1249.83 -1948.66 5973043.03 65Q035.21 GYD-CT-CMS 7697.69 36.90 237.83 7026.80 6961.81 -1258.10 -1961.25 5973034.51 650022.79 GYD-CT-CMS 7722.69 36J8 235.91 7046.80 6981.81 -1266.29 -1973.80 5973026.07 650010.41 GYD-CT-CMS 7747.69 36.64 237.55 7066.85 7001.86 -1274.49 -9986.29 5973017.62 649998.09 GYD-CT-CMS 7772.69 36.48 236.68 7086.93 7021.94 -1282.58 -1998.80 5973009.28 649985.75 GYD-CT-CMS 7797.69 36.75 235.88 7106.99 7042.00 -1290.85 -2011.20 5973000.75 649973.52 GYD-CT-CMS 7822.69 36.66 237.28 7127.04 7062.05 -1299.08 -2023.67 5972992.27 649961.22 GYD-CT-CMS 7847.69 37.11 235.83 7147.03 7082.04 -1307.35 -2036.19 5972983.75 649948.87 GYD-CT-CMS 7872.69 36.96 235.81 7166.99 7102.00 -1315.81 -2048.65 5972975.04 649936.59 GYD-CT-CMS 7897.69 36.84 235.96 7186.98 7121.99 -1324.23 -2061.07 5972956.38 648924.33 GYD-CT-CMS 7922.69 37.12 234.68 7206.95 7141.96 -1332.79 -2073.44 5972957.57 649912.14 GYD-CT-CMS 7947.69 36.19 236.84 7227.01 7162.02 -1341.19 -2085.77 5972948.92 649899.98 GYD-CT-CMS 7972.69 36.83 235.32 7247.10 7182.11 -1349.49 -2098.12 5972940.38 649887.81 GYD-CT-CMS 7997.69 35.87 236.08 7267.24 7202.25 -1357.84 -2110.36 5972931.78 649875.75 GYD-CT-CMS 8022.69 36.52 236.12 7287.41 7222.42 -1366.07 -2'122.61 5972923.30 649863.66 GYD-CT-CMS 8047.69 36.18 234.86 7307.55 7242.56 -1374.47 -2134.82 5972914.66 649£351.63 GYD-CT-CMS 8072.69 36.64 236.40 7327.67 7262.68 -1382.84 -2147.07 5972906.04 649839.55 GYD-CT-~MS 8097.69 36.62 235.19 7347.73 7282.74 -1391.23 -2159.40 5972897.41 649827.39 GYD-CT-CMS 8122.69 37.02 235.67 7367.75 7302.76 -1399.73 -2i 71.74 5972888.66 649815.23 GYD-CT-CMS 8147.69 37.31 236.14 7387.67 7322.68 -1408.19 -2184.25 5972879.94 649802.90 GYD-CT-CMS 8172.69 37.45 234.69 7407.53 7342.54 -1416.81 -2~96.74 597287i.07 649790.58 GYD-CT-CMS 8197.69 37.43 236.48 7427.39 7362.40 -1425.40 -2209.28 5972862.23 649778.22 GYD-CT-CMS 8222.69 37.81 235.38 7447.19 7382.20 -1433.95 -2221.92 5972853.43 649765.76 GYD-CT-CMS 8247.69 38.27 235.63 7466.88 7401.89 -1442.67 -2`134.62 5972844.45 649753.24 GYD-CT-CMS 8272.69 38.24 236.53 7486.51 7421.52 -1451.31 -2247.46 5972835.56 649740.57 GYD-CT-CMS 8297.69 38.48 235.14 7506.11 7441.12 -1460.02 -2260.30 5972826.59 649727.92 GYD-CT-CMS 8322.69 38.79 236.89 7525.64 7460.65 -1468.75 -227324 5972817.60 649715.16 GYD-CT-CMS 8347.69 38.35 234.56 7545.19 7480.20 -1477.52 -2286.12 5972808.57 649702.46 GYD-CT-CMS 8372.69 37.89 236.19 7564.86 7499.87 -1486.29 -2298.82 5972799.54 649689.94 GYD-CT-CMS 8397.69 37.93 234.57 7584.58 7519.59 -1495.02 -2:i11.46 5972790.56 649677.48 GYD-CT-CMS 8422.69 37.12 236.29 7604.41 7539.42 -1503.66 -2323.99 5972781.67 649665.12 GYD-CT-CMS ~ • ~ ",`3~A"8 !, P ~ ;i~^X~:~ Halliburton Company ~ ~~ ;. ~ ~~ Survey Report Company; BP AmoCO Date: 7/19/20Q7 Time; Q1:35:29 Pag~ ' 6 Field: Prudhoe Bay Go-ordinate(NE) Reference: Wells F-~~, True'North Site: PB F Pad ~'ertical (T~?D} Reference: F-096: 65.0 WeU: F-09 Section (~S) Reference: Welf (p:00N,tY.60E,250.3fAzi) Vl~ellpath:< F-096' Survey Calculation Method: ' Minimul~ Curvature Dbr ~racle 5urvey MD ft, 8447.69 8472.69 8497.69 8522.69 8547.69 8572.69 8597.69 8622.69 8647.69 8672.69 8697.69 8722.69 8747.69 8772.69 8797.69 8822.69 8847.69 8872.69 8897.69 8922.69 8947.69 8972.69 8997.69 9022.69 9047.69 9072.69 9097.69 9122.69 9147.69 9172.69 9197.69 9222.69 9247.69 9272.69 9297.69 9322.69 9347.69 9372.69 9397.69 9422.69 9447.69 `-~-~, 9472.69 9498.00 9533.30 9569.13 9604.14 9634.85 9662.96 9697.61 9726.80 9758.09 9790.97 deg 37.37 37.22 37.14 36.35 36.91 35.82 36.93 35.51 36.52 34.86 35.94 34.39 34.77 33.58 33.58 33.14 33.23 32.65 32.18 31.86 31.58 31.26 30.91 30.73 30.48 30.00 29.59 29.10 28.53 27.90 27.14 26.42 25.94 25.17 24.17 23.05 22.45 21.93 20.92 20.62 20.81 20.75 21.26 23.25 25.72 30.24 32.95 35.81 39.34 42.18 43.87 43.09 ~zim ' 'FVD' Sys-TVD N/S E/W deg ft ' ft ft ft 233.88 7624.31 7559.32 -1512.32 -2336.40 236.19 7644.20 7579.21 -1521.00 -2348.81 233.87 7664.12 7599.13 -1529.66 -2361.19 235.63 7684.15 7619.16 -1538.29 -2373.40 234.04 7704.22 7639.23 -1546.88 -2385.59 235.75 7724.35 7659.36 -1555.41 -2397.71 235.96 7744.48 7679.49 -1563.73 -2409.99 234.76 7764.65 7699.66 -1572.12 -2422.14 235.96 7784.87 7719.88 -1580.47 -2434.23 235.33 7805.17 7740.18 -1588J0 -2446.28 235.94 ' 7825.55 7760.56 -1596.88 -2458.23 236.33 7845.99 7781.00 -1604.90 -2470.18 235.69 7866.57 7801.58 -1612.83 -2481.95 236.90 7887.25 7822.26 -1620.63 -2493.63 236.69 7908.08 7843.09 -1628.20 -2505.20 237.10 7928.96 7863.97 -1635.71 -2516.71 237.43 7949.88 7884.89 -1643.11 -2528.22 238.78 7970.86 7905.87 -1650.29 -2539.76 239.98 7991.97 7926.98 -1657.12 -2551.30 240.34 8013.17 7948.18 -1663.71 -2562.79 240.37 8034.43 7969.44 -1670.21 -2574.22 240.77 " 8055.77 7990.78 -1676.62 -2585.57 240.84 8077.18 8012.19 -1682.91 -2596.84 241.46 8098.65 8033.66 -1689~10 -2608.06 242.03 8120.16 8055.17 -1695.12 -2619.27 242J7 8141 J6 8076.77 -1700.95 -2630.42 24329 8163.46 8098.47 -1706.59 -2641.49 243.63 ` 8185.25 8120.26 -1712.06 -2652.46 244.60 8207.15 8142.16 -1717.32 -2663.30 245.69 8229.18 8164.19 -1722.29 -2674.02 246.40 8251.35 8186.36 -1726.98 -2684.57 247.59 8273.67 8208.68 -1731.39 -2694.94 247.62 8296.11 8231.12 -1735.59 -2705.14 247.89 8318.66 8253.67 -1739.67 -2715.12 248.48 8341.38 8276.39 -1743.55 -2724.81 249.87 8364.29 8299.30 -1747.11 -2734.17 250.17 8387.34 8322.35 -1750.42 -2743.25 251.24 8410.49 8345.50 -1753.54 -2752.16 254.63 8433.76 8368.77 -1756.22 -2760.89 257.45 8457.14 8392.15 -1758.36 -2769.49 259.40 8450.52 8415.53 -1760.13 -2778.15 262.49 8503.90 8438.91 -1761.53 -2786.91 264.11 8527.53 8462.54 -1762.59 -2795.92 257.13 8560.20 8495.21 -1764.80 -2809.08 251.48 8592.81 8527.82 -1768.84 -2823.35 247.01 8623.72 8558.73 -1774.70 -2838.68 243.74 8649.88 8584.89 -1781.42 -2853.29 242.90 8673.08 8608.09 -1788.55 -2867.47 237.64 8700.54 8635.55 -1799.05 -2885.78 233.53 8722.65 8657.66 -1809.83 -2901.48 228.99 8745.53 8680.54 -1823.20 -2918.12 228.66 8769.39 8704.40 -1838.09 -2935.15 MapN ; MapE Too~; ft ~ 5972772.76 649652.90 GYD-CT-CM~ 5972763.83 649640.67 GYD-CT-C[u~ 5972754.93 649628.47 GYD-CT-Ctv~ 5972746.05 649616.43 GYD-CT-CA~ 5972737.21 649604.42 GYD-CT-Cl4~s 5972728.45 649592.47 GYD-CT-CM~ 5972719.88 649580.37 GYD-CT-CNA~ 5972711.24 649568.39 GYD-CT-GfV~ 5972702.64 649556.47 GYD-CT-GI~S 5972694.17 649544.60 GYD-CT-CA~tS 5972685.76 649532.81 GYD-CT-CA~°s 5972677.50 649521.02 GYD-CT-CWlS 5972669.33 649509.42 GYD-CT-CMB~"u 5972661.30 649497.90 GYD-CT-CM~ 5972653.49 649486.49 GYD-CT-Cl1~5 5972645.75 649475.13 GYD-CT-CM s 5972638.12 649463.77 GYD-CT-C(V~ 5972630.71. 649452.38 GYD-CT-CM1~ 5972623.65 649440.99 GYD-CT-CN~ 5972616.82 649429.63 GYD-CT-CIV~ 5972610.09 649418.34 GYD-CT-CI4~S 5972603.46 649407.12 GYD-CT-CMs 5972596.94 649395.99 GYD-CT-CA~&.S 5972590.53 649384.90 GYD-CT-CN~ 5972584.28 649373.81 GYD-CT-CIV .~S 5972578.22 649362.78 GYD-CT-CRI~ 5972572.36 649351.82 GYD-CT-CIV~.S 5972566.67 649340.97 GYD-GT-CW~ 5972561.19 649330.24 GYD-CT-CN~ 5972556.01 649319.62 GYD-CT-CM~ 5972551.10 649309.17 GYD-CT-CMS 5972546.49 649298.89 GYD-CT-Cfv1~ 5972542.08 649288.78 GYD-CT-CMS 5972537.80 649278.89 GYD-CT-CMu 5972533.72 649269.28 GYD-CT-CIN~ 5972529.97 649260.00 GYD-CT-CMt~ 5972526.49 649250.98 GYD-CT-CMS 5972523.19 649242.14 GYD-CT-CNR.~.a 5972520.33 649233.47 GYD-CT-CM s 5972518.01 649224.91 GYD-CT-C[1~ 5972516.06 649216.29 GYD-CT-CIVG~ 5972514.49 649207.56 GYD-CT-CM1A~ 5972513.25 649198.58 MWD+IFR+M1~S 5972510.78 649185.47 MWD+IFR+l~ 5972506.44 649171.28 MWD+IFR+IV~S 5972500.27 649156.08 MWD+IFR+A~S 5972493.26 649141.60 MWD+IFR+k~S 5972485.85 649127.57 MWD+IFR+kV~,S 5972474.98 649109.48 MWD+IFR+t1~RS 5972463.88 649094.00 MWD+IFR+A~S 5972450.18 649077.64 MWD+IFR+lI~S 5972434.95 649060.92 MWD+IFR+R~S • • ~' ~"~::; ,.:3 " ~,, ~ "~ ~ t, Halliburton Cornpany ~ ~ ~ ~ ~ ~ ~ Survey Report Company: BP AmoC4 Date: 7/i9/2~Q7 Tirae: Q~:35:29 Page: ' 7 Field: PrUd hoe Bay Co-ordinate(1~ Reference. 's W811:,F~(79, True!North Site: PB ~ Pad Vertical (T~D) Reference: F-09B: 65:0 Well: F-09 ' Section (VS) R~~erence: Well (O:OON,O.QQE,250.31iAzi) Weilpath: F-09 B Survey Calculai~n Methdd; MinimUm Curvature Db: OraCle Survey MD' Inct Azim " TVD Sys TVD N/S ` EfW MapN 1VIa~SE Tooi it deg deg ft ft ft ft ft : f# 9819.50 42.71 227.79 8790.29 8725.30 -1851.03 -2949.63 5972421.72 64904f,.70 MWD+IFR+MS 9850.03 41.59 233.20 8812.93 8747.94 -1864.06 -2965.~i2 5972408.37 649031.18 MWD+IFR+MS 9881.96 40.93 236.21 8836.94 8771.95 -1876.23 -2982.~ 5972395.86 649014.25 MWD+IFR+MS 9914.99 40.37 235.39 8862.00 8797.01 -1888.32 -3000.~ 5972383.41 648996.70 MWD+IFR+MS 9946.74 42.87 240.26 8885.74 8820.75 -1899.52 -3018.24 5972371.85 64897~3.09 MWD+IFR+MS 9977.54 45.54 245.07 8907.82 884~.83 -1909.36 -3037.32 5972361.63 648960.22 MWD+IFR+MS 9994.54 47.07 247.72 8919.57 8854.58 -1914:27 -3048.58 5972356.49 64894~J.fl6 MWD+IFR+MS 10024.92 50.32 251.65 8939.62 8874.63 -1922.18 -3069.96 5972348.15 6489~?.93 MWD+IFR+MS 10057.95 54.58 256.28 8959.75 8894.76 -1929.38 -3095.~4 5972340.45 648902.82 MWD+IFR+MS 10088.69 58.59 258.30 8976.68 8911.69 -1935.01 -3120.i~ 5972334.31 648877.92 MWD+IFR+MS 1011920 62.49 261.10 8991.68 8926.69 -1939.74 -3146.~ 5972329.05 648851.89 MWD+IFR+MS 10150.47 66.65 260.97 9005.11 8940.12 -1944.15 -3174.fi$ 5972324.08 648824.10 MWD+IFR+MS 10183.03 70.70 261.55 9016.95 8951.96 -1948.75 -3204.1~ 5972318.87 648794.23 MWD+IFR+MS 10213.61 74.83 261.91 9026.01 8961.02 -1952.95 -3233.OL~i 5972314.09 648765.42 MWD+IFR+MS 10244.83 79.95 263.06 9032.82 8967.83 -1956.93 -3263.2'~S 5972309.49 648735.32 MWD+IFR+MS 10277.66 84.32 265.03 9037.31 8972.32 -1960.30 -3295.~ 5972305.47 645703.06 MWD+IFR+MS 10306.64 88.21 264.13 9039.20 8974.21 -1963.03 -3324.~ 5972302.16 648674,34 MWD+IFR+MS 10335.73 90.80 265.67 9039.45 8974.46 -1965.62 -3353.~4 5972298.98 648645.43 MWD+IFR+MS 10368.23 90.19 266.20 9039.17 8974.18 -1967.92 -3385.7~ 5972296.02 648613.()7 MWD+IFR+MS 10400.28 89.57 266.92 9039.24 8974.25 -1969.84 -3417.T~4 5972293.45 6485$1.12 MWD+IFR+MS 10444.12 92.65 268.53- 9038.39 8973.40 -1971.58 -3461.53 5972290.83 648537.38 MWD+IFR+MS 10492.68 91.79 272.01 9036.51 8971.52 -1971.35 -3510.~ 5972290.07 64848~.87 MWD+IFR+MS 10536.88 95.88 272.94 9033.55 8968.56 -1969.45 -3554.Y~ 5972291.08 648444.$0 MWD+IFR+MS 10584.74 92.59 276.24 9030.01 8965.02 -1965:63 -3601.66 5972293.94 648337.17 MWD+IFR+MS 10634.89 92.28 277.36 9027.88 8962.89 -195970 -3651_~?I 5972298.86 648347.31 MWD+IFR+MS 10678.64 92.78 278.42 9025.95 8960.96 -1953.70 -3694.7''~ 5972303.98 64830~.91 MWD+IFR+MS 10724J1 93.33 280.10 9023.50 8958.51 -1946.30 -3740.tti 5972310.46 648258.37 MWD+IFR+MS 10771.49 92.65 280.22 9021.06 8956.07 -1938.06 -3786.~9 5972317.77 648212.23 MWD+IFR+MS 10817.66 91.67 280.67 9019.32 8954.33 -1929.69 -3831.~Fr7 597232521 648166.70 MWD+IFR+MS 10864.16 92.29 280.53 9017.71 8952.72 -1921.14 -3877.1'~4 5972332.83 648120:$6 MWD+IFR+MS 10907.80 91.30 28122 9016.34 8951.35 -1912.91 -3919.9tl6 5972340.19 64807,'.88 MWD+IFR+MS 10956.47 90.31 278.50 9015.66 8950.67 -1904.58 -3967.~ 5972347.55 64802~.78 MWD+IFR+MS 11002.07 89.32 280.79 9015.81 8950.82 -1896.94 -4012.~ 5972354.28 647984.58 MWD+IFR+MS 11048.40 88.02 279.94 9016.88 8951.89 -1888.61 -4058.4~ 5972361.69 647938.97 MWD+IFR+MS 1109274 88.15 273.96 9018.37 8953.38 -1883.25 -4102.4A3 5972366.15 647894.90 MWD+IFR+M5 11141.52 88.27 274.29 9019.89 8954.90 -1879.74 -415i.f~'3 5972368.67 647846.22 MWD+IFR+MS 11185.94 88.58 275.47 9021.11 8956.12 -1875.96 -4195.2~ 5972371.55 647801.91 MWD+IFR+MS 11235.03 88.52 274.73 9022.35 8957.36 -1871.60 -4244.1~ 5972374.92 647752.96 MWD+IFR+MS 11281.64 89.07 274.71 9023.33 8958.34 -1867.77 -4290.S~J 5972377.82 647706.45 MWD+IFR+MS 11329.52 89.38 274.45 9023.98 8958.99 -1863.94 -4338.3~ 5972380.67 647658.66 MWD+IFR+MS 11373.89 89.69 274.62 9024.34 8959.35 -1860.44 -4382.5b 5972383.28 647614.37 MWD+IFR+MS 11423.65 90.00 274.51 9024.47 8959.48 -1856.48 -4432.1~ 5972386.24 647564.71 MWD+IFR+MS 11467.43 90.37 27520 9024.33 8959.34 -1852.77 -4475.T~ 5972389.06 647521.02 MWD+IFR+MS 11517.01 90.62 275.77 9023.90 8958.91 -1848.03 -4525.t~ 5972392.79 647471.59 MWD+IFR+MS 11562.09 89.57 275.97 9023.83 8958.84 -1843.42 -4569.9~'i 5972396.49 647426.66 MWD+IFR+MS 11609.95 90.12 276.88 9023.96 8958.97 -1838.07 -4617.5~ 5972400.89 647379.01 MWD+IFR+MS ~ 11654.97 89.20 275.79 9024.23 8959.24 -1833.10 -4662.2°~ 5972404.94 647334.18 MWD+IFR+MS 11701.79 89.63 276.64 9024.70 8959.71 -1828.03 -4708.$~ 5972409.07 647287.55 MWD+IFR+MS 11747.94 86.98 273.97 9026.07 8961.08 -1823.76 -4754.7~ 5972412.40 647241.55 MWD+IFR+MS 11796.41 87.10 273.18 9028.57 8963.58 -1820.75 -4803.d~ 5972414.44 647193.19 MWD+IFR+MS 11841.24 85.86 273.54 9031.33 8966.34 -1818.12 -4847.71~ 5972416.16 647148.48 MWD+IFR+MS 11888.94 85.86 273.58 9034.77 8969.78 -1815.17 -4895.fJ 5972418.15 647100.95 MWD+IFR+MS 11944.32 85.86 273.85 9038.77 8973.78 -1811.59 -4950.3~ 5972420.61 647045.78 MWD+IFR+MS ~ Halliburton Company Survey Report . ~ ~~.,~~ ~ ~ y ~ ~ ~ ~ ~ ~ ~ ~~~ }~~ Gompany; BP Amo~o Date: 7/19/200~ Time: 01:35:29 Page: 8 Field: Prutlhoe Bay Co-ordinate(~'E} Referenee: : W~It: F'-d9, 7ru~: Nodh Site: PB F Pad VerticaE (TVI3) Referenee: F-t19g: fi5.0 Well: F-09 Section (~S) Reference: Welt-(Q:(~QN,O.d0E,250.31Azi) VVellpat~: F-096 Survey CalcytaNan Method: Min[mttm CurvaCure Db: (Jracte Survey MD Incl Azi-n TVD ` Sys TVD N/S E!W MapN ' MapE Tool ft deg deg ft ft (t ft ft ft 12040.00 85.86 273.85 9045.67 8980.68 -1805.18 -5045.53 5972425 .09 646950.46 PROJECTED to TD ~~ _ IVV~LFdF~I~= N1eE~/OY iACT'Ui41"C}f2 = C7T~ i }C8. El.EY = 6~3.39 BF. ~l.EV = Kt)P = _ --954~# Max Ang~ = ~6 ~ 9(~33" t?atumAt~.1= 991~' t7atum YItD = 88U0` S8 ~ ~ ~-~~a- cs~, ~z#, ~.-sa, ~ = ~ 2.~~a~ ~- 2't~• G~1 1 . ~'!l1 . A t~1 P-2~ Ct)L~1~ 293t}' TQP C?F 7" lNR 89(~~a` (15ti 5X C.~h~S 6 ACR~S~ TB PtCI~ 2.~#, 13Cr-8fl, Vam Top Tubing 9334' s-sls~ csc, a7~, ~-sa, ~r = s.sst n 333tY Bt~T 2}(P L7P PACKEF~ 93~8` BOT 7~ Whit~tock 95~t 1" FEfiFCIRA'TlpN S4~MARY !3~" LC~C: Bt~ GR A t~LE }tT TC1P ~': ~t ~ i iki6tY E~t~: Refer to Prndt~cikan DB ttrr h~st~t~at per# da3e S~E S~ IN~tAL {~NS~Z C~~ 2_8~5" ~ 1 USEiO -3fl63{l t3 t~`i12t~1~}?' 2:875" 6 1 tN6~0 - 10680 C} fl612{1it37 2~875" 6 i 47fl0 - 1 t28AU ' tl Q&12()1437 2.875" S 11 {}$fl -11195 t7 U6F2€f!£~7 ~~ c.r~~, ~re, ~.-~o, .t~r~ ~pt, ~ = s.~~a H 1~i2~2' ~RGIKA GTf! StC1~"E'E GRCGiTTLH l1VER N3 Ct~ L BlV1cllKK A[~ERFS E7TRlPAG GLV Gt7 _ ,,,,._,.,, .....,.. KSBi7Lli fTX TFk~ SET` s~~r~r :~s-~~ cs~ vva~ c~'C ~ zasa'. 7", z5~, IJ4~ W11 8AC#C ~ 8902' ~t+~? RAN i't1 StR~. ~' WAS F~ IN L7~.D 9-6~" GS~ SRf3UL WfT" SLIPS~'• 2t}30' (-{TOP C~ 9-518" (~CIT & 'FZ)P F'ULLE~ 222~' ~-112" 7C Ni~ple ~[)~3,893" '' ~as ~~rnnA~c~~s 57 tU~ NII' [7Et! TYP~ V'L1/ LA`T~H F'~1F~T ClA7E 2 4' 3~t18 6242 3408 5813 1'4 39 #CBG2 ltBG-2 ~7V 13GtC BK 8EK Q6/22JQ7 !}Bl22JCi7 ~;~:3~' f"' X 431e $$~' ?" 7741V PKR 9334' 4-172" WLEG 9498' ~{~ ~~ 11263' I"'I ~TD I I ~41t2", 1'2.6#, 1-8t~, ~T N! L~er ~~ 1'C35t7' ~ '9823' --~'~t31' CyF V~C3~N~ 12040' --~ 9~t}5" CIBP set in 2-318" liner ~. \~l 1 Q18'~i' - tvw RKER .3U~ °~(~4~~ ~ F~TC? ~ I LP+1E2. 4-7#< L-817. .t~39 bpf, ~1=1.99~5" PRUCN~4OE BAY UNR WELL: F-09A F~itf Na: ~Qi' 1980 APf No: 54-029-2Q403-a1 5EC 2, 71 t N, R9 3E BP Eicploration (Alt~ska) ^f 098"[' ~ ~ ~~~ Date 09-20-2007 Transmittal Number:92904 ~' ' BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) have anv questions, please contact llouglas L~ortcn at tne rU~. a[ ~b4-4y i 3 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 09-15A ao"~°~a~ ~` ~S~l~6 _ AGI-10A~o~--3~ ~` is~/~a ____ __. _ _ __ F-01A ~V(v-t0~ * ~3</b3 4o5~13Iy F-01 APB1 ----- ---------- - - - _ __ _ ~ ~5~/1s5 F-09Bao~'~i3 _ _ _ _ F-42A c~U'~- U`~3 '~ 1 5~/'`6~0 L-204L1 a~-pci3 ~ ~5~/~~ L-204L2 av(o- bq ~l `~ ~S~/~5~ L-204L3 a(~(o-p~S ~t5~/~ L-204L4 a U(o-O4 ~, ~ l 5~l ~ d N-22B ~U(o -!!o / f' ~5 </9 / ,V-205L1 ~U~,-~~! ~' Is~lSa 'V-205L2 aU(o-!~a ~ 15~3 W-204L1_~U~-.r_59 ~ c~_S!°,_~~ __ W-204L2 ~v~ -l !o O *' !S L!4 5 _ WG1-09 V=.c~a~- /~/~ ~tS'~l9~ Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2- l 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 995 1 9-66 1 2 - ~ s~. ~ ~ ~.~ Fr ~ ~ ' -~ .~~-~ , : ! t ,.:. ~f - ~. i b~ ~ RE: F-09B (207-013) Liner ~ ~ Subject: RE: F-09B (207-013) Liner From: "Rose, John G (FAIRWEATHER)" <Tohn.G.Rose@bp.com> Date: Mon, 18 Jun 2007 11:13:26 -0800 To: Thomas Maunder <tom maunder~~dmin.state.ak.us> Tom, To minimize the amount of rat-hole shale for our 4-1/2" liner jab, we will move liner shoe depth to 150' below lowest perf. Thanks - jr Jahn G. Rose BP-Alaska Drilling Group Offce 907/564-5271 Cetl 907/748-5223 Fax 907/564-4040 Prom: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Monday, )une 18, 2007 10:33 AM To: Rose, ]ahn G (FAIRWEATHER) Subject: Re: F-09B (207-013) Liner John, Thanks for the information. Not lining/cementing the bulk of the non-pay section makes sense. The only change I would ask is to put the liner shoe at about 11350' md. This gives 150' beyond the pay zone end which is a distance similar to that allowed for liner laps. Also for future messages, please include the permit number. That helps in filing. Good luck with the operations. Ca11 or message with any questions. Tom Maunder, PE AOGCC Rose, John G(FAIRWEATHER) wrote, Qn 6/18/2007 10:26 AM: Tom, F-09B was TD'ed per the Drilling Permit (207-013) this moming (6/18/07) at 12,040' MD. With the end of our Zone 2 pay at ~11,200' MD and the last ~800' of the well being basically non-pay shale, we have decided to run our 41/2" production liner to 11,300' MD (includes ~100' shoe track) where we will perform a conventional liner cement job to fully cement the liner above the shoe to include a 150' of liner lap into the 7" liner of the parent well. That being the case, this e-mail confirms our plan to leave the lower ~700' of the well un-cemented as discussed with your o~ce this morning. If you have any questions or concerns, please advise. Thanks - JR John G. Rose ' BP-Alaska Dnlling Group ' Office 907/564-527? Ce11907/748-5223 ' Fax 907/564-4040 1 of 1 6/18/2007 11:52 AM Re: F-09B Drilling Permit ~ Nothing further is needed. Tom Maunder, PE AOGCC ~ Rose, John G(FAIRWEATHER) wrote, On 6/4/2007 10:56 AM: ', Tom, ' Please note the following changes to our F-09 Sidetrack plan: ' 1. As the current 7" production liner in this well is 29#, the sidetracked well will be a 6" hole instead of ', the 6-1/8" hole as requested in the original Permit to Drill. 2. As we will mill a certain amount of cement and 2-3/8" inside the 7" liner to insure that our whipstock departure is below the top of the Sag River formation, we will set our whipstock directly on top of the milled cement in the 7" liner and no EZSV will be required. Nabors 2ES moved onto this well on Saturday (6/2/07) and we are currently in the de-completion phase of the planned sidetrack. If you have any question or concerns, please advise. Thanks - JR <lvhrt ~. Rnse BF'-Ri~ska L~rilling ~roup ~ffice 9C17'1564-5271 C~119t17I748-~223 F~x 9Q715~~-4~4Q 1 of 1 ~ 6/4/2007 ll:03 AM John, et al, ~~ ~ ~,~ Thanks for the updated information. I will place a copy of this message in the file. Re: F-09B change from Sundry KT1s - Thank you for the revised well schematic and description of the proposed changes to the well configuration (no EZSV and revised depth for production packer). These are not major changes in work scope as approved by Sundry 307-046 (PBU F-09A) and PTD 207-013 (PBU F-09B). Leaving the EZSV out of the P&A is acceptable. I will place a copy of this email and the revised well schematic in our files. No need to resubmit the sundry far approval. Jim Regg AOGCC Honas, Kristopher wrote, On 5/29/2007 3:10 PM: «F-09B Planned Final 150 ft Iap.ZIP» Jim, Attached is the proposed schematic for the F-09B. The major change, as we discussed, is leaving out the 7" EZSV plug just below the whipstock. The old wellbore will still be P&A'd with a CIBP in the 2-3/8" liner as well as a fully cemented 4-1/2" liner with Baker Flex Lock packer. The reason for the change is that cement will have to be milled up to allow our kick off point to be below the top of the Sag River formation. One other change you might notice is placing the production packer above the 7" TIW packer to keep us up in the 7" tieback. Please let me know if you have any concerns about this plan. My phone numbers are listed below. Thanks Kris Honas GPB Rotary Drilling 564-4338 440-2389 : Jim Regg <~zm re,~(a>admin.state.ak.us> ' Petroleum Engmeer AOGCC 1 of 1 5/29/2007 4:44 PM ~ ~ ~ ~ TREE _ VvELLHEAD = McEVOY /~ ~ O Y~ E ~ ACTUATOR = ~ W Li IJAS WAS T ED 9/[CK ~ e90F AN0 HAN 0511pF. i"WAS KB ELEV = ~~f""~~~~~ ~ HIING iN OL~ 9-510" CSG SPOOL Wli"SLIPS•'• . ~"'r BF. ELEW = ....... ...................................................... I{OP = -9500 Max Angle.._ .................................. ." .... ... ......................._..................... Datum MD = ZO30' ~TOPOF9-518"(CUT&TOP~PULIED _....::....... _ ............................. _......... Datum TWD = ~ . 2200' 4-1l2" X Nioole ID=3.813" 13-38" CSG, 72#, L-80, ID =12.347" ~-~ 2700' ~~ ~ ~ j ~~"~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE "~T~H: i9~Xi~E A~ ~-~ E;,~E.#,:35'~l_ Z930' 2 3410 3400 11 KBG-2 DCK-2 6204 5800 34 !(8G-2 DMY TOP OF 7" LNR I 8902' (150 SX CLA55 8 ACROSS TB PKR) 4-1/2", 12.6#, 13Cr-80, Vam Top Tubinq 9350' 8810' 7" x 4-1/2" BOT 5-3 Packer 8899~ 7" TMJ PKR 8835' 4-11~" X Nitipie ID=3.813" 9-S~" CSG, 47#, L-80, ID= 8.681 " BOT Flex Lock PACKEF Top of Cement PERFORATION SUMMARY REF LOG: BHI GR ANGLE AT TOP PERF:~83 ~ 10198' Note: Referto Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 1.56" 6 10198 -10248 P 8 A OSf18/04 1.56" 4 10380 -10620 P& A 01 A12102 1.56" 6 1 D663 -10738 P 8 A OSM 8N4 1 f2", 12.6#, L-8D, IBT-M Liner ~ ~ 1204 TOPOF WINDOW \~' ~ 7" LNR.29#, L-80, .0371 bpf, 10=6.184" ~ JOIN T 4.7#,L-80,.0039 bpf,ID =1:995" DATE ftEV BY COMMENTS DATE REV BY COMMENTS 7210i1i9 ORIGINAL COMPLETIUN OSM ON6 CAT/fLH MAJOR COftRECTI0N5 07f02102 OACIKAK CT~ SIOETMCK 03l20N2 GRGTLH LINER ID CORRECTION OS~D8N4 BMcLMK ADPERFS 01M7N6 DTRIPAG GLV G~0 01120N6 KSB/TLH PH TTP SET PRUDHOE BAY UNIT WELL: F-09A PERMIT No: $2011980 API No: 50-029-204D3-01 SEC 2, T11 N, R13E BP Exploration (Alaska) ~ ~ SARai(-! P,~LIRI, ~a01lERRIOR Greg Hobbs Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. 7th AVENUE, SUITE 100 ANCHORAGE,ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, F-09B BP Exploration (Alaska), Inc. Permit No: 207-013 Surface Location: 2467' FNL, 2405' FWL, SEC. 02, T 11 N, R 13E, UM Bottomhole Location: 4280' FNL, 2643' FEL, SEC. 03, T11N, R13E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this ~ day of February, 2007 cc: Department of Fish 8a Game, Habitat Section w/ o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 ~~-~~~~ /-~D~~ ~~ 1 a. Type of work ^ Drill ~ Redriil ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ StratigraphicTest ~ Development Oil ^ Single Zone 1 c. Specify if w II ~S . ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas JA N 2 6 2007 2. Operator Name: BP Exploration {Alaska) Inc. 5. Bond: ~ Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: ~~~~~~ ~~~ ~~+~--ttS• ~~17113SiUt1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12042 ND 9019 12. Field / Pool( '~~ .~~~~~ Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 2467' FNL 2405' FWL SEC 02 T11 N R13E UM 7. Property Designation: ADL 028281 Pool , , , , . , Top of Productive Horizon: 4373' FNL, 1695' FEL, SEC. 03, T11N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: June 1, 2007 Total Depth: 4280' FNL, 2643' FEL, SEC. 03, T11 N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 13,870' 4b. locatio~ of Well (State Base Plane Coordinates): Surface: x-651959 y-5974333 Zone-ASP4 10. KB Elevation Plan (Height above GL): 64.99 feet 15. Distance to Nearest Well Within Pool: 216' 16. Ueviated Wells: Kickoff Depth: 9500 feet Maximum Hole An le: 91 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3180 Surface: 2300 18. Casin P eam: S' cificat' n To - Settin De h- Bo ftom ' anti f Ce nt c.f. r a k Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta e data 6-118" 4-1/2" 12.6# L-80 IBT-M 2692' 9350' 8386' 12042' 9019' 383 cu ft Class'G' ~g: PRESE NT WELLCQNDITION SUMMARY (To`be completed for Redrill and Re-entry Opeeations) , Total Depth MD (ft): 10981 Total Depth TVD (ft): 9056 Plugs (measured): 8728 Effective Depth MD (ft): 10946 Effective Depth ND (ft): 9055 Junk (measured): None Casing Length ize CementVolume MD - TVQ Conductor / Structural 11 ' 20" x 30" 7.9 u ds P rmafrost 110' 110' Surface 2700' 13-3/8" 4269 cu ft Arcticset 2700' 2699' Intermediate 9390' 9-5/8" 1230 cu ft Class'G' 130 cu ft AS 9390' 8423' Pr i n Liner 924' 7" 391 cu ft Class 'G' 8899' - 9823' 7987' - 8831' Liner 2223' 2-3/8" 73 cu ft Class 'G' 8758' - 10981' 7869' - 9056' Perforation Depth MD (ft): 10198' - 10738' Perforation Depth TVD (ft): 9045' - 9042' 20. Attachments ~ Filing Fee, $100 ^ BOP Sketch ~ Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ~ Drilling Fluid Program ~ 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the,f re ing is true and correct. Contact Kris Honas, 56a-a338 Printed Name Gre i Title Senior Drilling Engineer Prepared By Name/Number: Si nature i~ Phone 564-4191 Date ° C~ ,:~ ~ Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: D- D/3 API Number: 50-029-20403-02-00 Permit Approval See cover letter for Date: oa o B 07 other re uirements Conditions of Approval: ~ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes [~ No Mud Log Req'd: ^,~c Yes ~No HZS Measures: (~ Yes ^ No rectional Survey Req'd: ~I Yes ^ No Other: ?~S~ eS ~ ~e~ ~Z ~~ +~-~ ~~ 7 ~ S ~'" APPROVED BY THE COMMISSION Date - iQ , COMMISSIONER Form 10-401 Revised 12/2005 ~~~ A~~ ~ ~ / Submit In DupliCate ~ \ ~ ~ ~ Directional Proqram A roved Well lan: W P04 Exit oint: 9500' md / 8526' tvd Maximum Hole Inclination: Original well bore is vertical building to -20° at KOP, Horizontal interval is _91 ° from 10469' to TD Proximity Issues: Pre-rig gyro required for F-09 as well as J-05A to clear up uncertainty issues Survey Program: Gyro orientation will be required for the initial kick-off. Standard MW D+I IFR+MS Nearest Well: Well J-05A, with a center-to-center distance of -216' at ~11912' md. Nearest Property Line 13,870' Loqqinq Program Hole Section: Required Sensors / Service 6-1/8" production: DIR/GR/RES throughout the interval all in real-time mode. Neutron and Density tools will be picked up on the second run and a MAD performed from TD to 100' above PGOC BEFORE drillin the lateral. Sam le Catchers will be required. Cased Hole: None lanned O en Hole: None lanned Mud Proqram Hole Section / operation: 6-1/8" Production Interval Type Density (ppg) PV YP LSRV API FL pH FloPro SF 8.4-8.5 8- 15 24 - 30 > 20,000 7- 9 9.0 - 9.5 Casinq / Tubinq Proqram Hole Size Casing/Tubing ' Size Wt. Grade Connection Length Top md / tvd Bottom md / tvd 6-1/8" 4-1/2" 12.6# L-80 IBT-M ~2692' 9350' / 8386' 12042' / 9019' Tubin 4-1/2" 12.6# 13Cr VamTo ~9353' Surface 9353' / 8389' CementinA Proqram Casin Strin : 4-1/2", 12.6#, L-80, IBT-M solid roduction liner Slurry Design Basis: Lead slurry: none planned Tail slurry: 2542' of 4-1/2" X 6-1/8" annulus wfth 40% excess, plus 80',of 4; 1/2", 12.6# shoe track, plus 187' of 7 X 4-1/2 liner lap, plus 200 of 7 X 4 drill i e annulus. Pre-Flush 132.2 bbls, 10.2 , W MB Fl id S / V l S acer 20 bbls MudPUSH II at 13 u s equence ume: o Lead Slur None lanned Tail Slur 68.2 bbl / 328.62 sk Class `G', 15.8 ; 1.17 ft /sk. BHST: 205° f t ill b b t h i d b i C BHCT: 150° emen w a c m xe e ore pump ng e F-09B Sidetrack Page 2 ~ ~ Casing / Formation InteArity Testing Test Test Point Test Type Test pressure 7" window 20' be ond mid-window F!T 10.1 EMW 4-1/2" liner Landing collar to surface Casing Test 30 min recorded 3,500 psi surface Well Control Well control equipment consisting of 5,OOOpsi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics are currently on file with the AOGCC. Well Interval: 6-1/8" production liner section Maximum antici ated BHP: 3,180psi at 8,800' sstvd. Maximum surface ressure: 2,300pS1 (based upon BHP and a full column of gas from TD C 0.10 psi/ft) Calculated kick tolerance: Infinite with 8.5 EMW FIT FIT to 10.1 EMW Planned com letion fluid: 8.5pp seawater with ~2100' diesel Planned BOPE test ressure: 250 si low / 3,500 si hi h-14 da test c cle. Planned BOPE function test BPXA requests a variance to the provisions of 20 AAC 25.035 (e)(10)C regarding the function pressure test requirement after the use of BOP ram type equipment for other than well control or equivalent purposes, except when the routine use of BOP equipment may have compromised their effectiveness. (Example would be when pipe rams are inadvertently closed on a tool joint during routine operations.) The activities associated with this re uest will not com romise the inte rit of the BOP e ui ment. Disposal Annular In'ection: No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations are to be hauled to the Grind and Inject station at DS-04. An metal cuttin s should be sent to the North Slo e Borou h. Fluid Handling: All drilling and completion fluids and other Class II wastes are to be hauled to DS-04 ~ for in ection. All Class I wastes are to be hauled to Pad 3 for dis osal. Geoloqic Proqnosis Sa River 8343 Yes Kickoff 8443 9500 MD TSAD / TZ4B 8550 20 Yes 3180 si @ 8800 TZ4A/42N 8634 20 Yes TCGL / TZ3 8690 20 Yes BCGL/TZ2 8767 20 Yes 25N / T2B 8834 30 Yes 22 N/2A 8897 30 PGOC 8915 20 Yes MHO/HOT BWB 8985 10 Yes TZ1 B BW B 9007 20 Yes BSAD BW D 9101 20 No F-096 Sidetrack Page 3 ~ ~ TD Criteria TD Criteria 600' of pertorations with a 200' minimum (horizontal): Fault Proqnosis F-09B is not expected to cross any faults, however, it will pass into a small graben between two east west trending faults. The N side of the graben is a small fault (~10-15 ft, down to the S) which trends east west and is approximately 230 ft N of the horizontal section at the planned BHL. To the S of the well is another small fault (~10 - 15 ft, down to the N) which also trends east west, and is about 220 ft S at the BHL. Lost circulation in this area is moderate. The closest significant incident was ~1800' south at F-08 which lost 535 bbls. There is probability that moderate lost circulation will occur in F-09B. F-09B Operations Summarv Current Condition: / F-09A is currently shut-in due to Tx1A communication. A caliper was run in January 2006 and showed the tubing to be in poor condifion. There are 30+ joints of tubing with greater than 50% penetrafions. / TTP set Q8728' MD on 1/20/06. / CMIT T x IA passed to 3500 psi on 8/18/06 / MITOA failed to 2000 psi on 8/18/06. / PPPOT- T& IC passed on 8/2/O1. Pre-Rig Work (F-09A Well): 1. Bleed OA, IA & tubing to 0 psi. PPPOT-T & IC. Function all LDS. 2. RU E-line and pull TTP set @8728' MD. 3. With E-line, set CIBP in 2-3/8" liner at ~9905' MD. 4. With E-line, run SCMT to confirm top of cement behind the 2-3/8" liner in the 2-3/8" x 7" annulus (estimated top at -9500' MD). 5. Jet cut 2-3/8" tubing at top cement (-9500' MD). 6. With tubing punch, shoot hole(s) in the 3-1/2" tubing just above the 2-3/8" deployment sub at ~8758' MD. 7. Fluid pack well w/seawater. 8. CMIT TxIA to 3500 psi. ~U~ ~~' ~~ 9. MIT OA to 2000 psi. 10. Bleed tubing, casing and annulus pressures to zero. 11. Using service coil, RIH & pull 2-3/8" liner from cut point to just below the wellhead and hang on 3-1/2" hydraulic set tubing hanger. (NOTE: With the top of the 2-3/8" liner just below the wellhead, the drilling rig can pull and LD the liner after it moves over the well.) 12. Circulate the well to seawater through the tubing punch hole(s) at -8758' MD. 13. Freeze protect the well on both sides of the 3-1/2" tubing to 2200' with diesel. 14. Set a BPV and test to 1000 psi from tubing annulus. 15. Secure the well and level the pad as necessary. Pre-Riq Work (J-05A Well): 1. RU E-line and run a tie-in gyro on this well (Gyro Data) to as deep as possible to clear-up anti-collision issues currently existing with the F-09B directional plan. Riq Operations: 1. MI/RU F-09B Sidetrack Page 4 ~ ~ 2. 3. 4. 5. 6. 7. 8. 9. 10. r~.\~~~ ~,~c I O"1 12 ~j 13 14. 15. Test T x IA to 3500 psi f/10 min. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater and confirm well is "dead". Install TWC. Nipple down tree. Nipple up and test BOPE to 3,500 psi. Pull TWC. Puil 2-7/8" liner from just below wellhead. RU E-line and make jet cut on the 3-1/2" tubing at --8768' MD. Pull 3-'/2" tubing from -8768' MD. TIH w/overshot and recover 3-1/2" PBR and/or latch assembly. If not recovered with the PBR, TIH to recover latch assembly. Mill and recover the 3-1/2" x 7" packer assembly. MU 7" clean-ouUmilling assembly and clean-out the well to allow whipstock departure with a 6-1/8" drilling assembly at ~9500' MD. (NOTE: With the top of the Sag River formation at 9483' MD, a certain amount of cement & 2-3/8" liner may need to be milled-up to accommodate a whipstock departure at a depth befow the top of the Sag River formation. The target depth for setting the EZSV should be -9525' MD.) RU E-line and RIH with 7" GR/JB & GR/CCL to TOC -9525' MD in preparation to set EZSV for whipstock. (NOTE: Use logging data to confirm whipstock departure to be below top of Sag.) 3o~-Q~-{ ~ With E-line, run tie-in gyro from surface to --9525' MD (Gyro Data). W ith E-line, set 7" EZSV retainer and set at ±9525' MD to allow for an 9500' MD whip-stock KOP (max hole angle to 9525' MD is 38 degrees at 8200' MD). Set storm packer and change-out 7" pack-off (pull pack-off thru BOP stack if possible). Pressure test 7" casing to 3500 psi for 30 minutes and chart. (NOTE: There is currently no evidence of inte rit roblems with this w II 16. P/U and RIH with 7" Baker bottom-trip anchor whip stock assembly and set on EZSV at -9525' MD. Orient whipstock as desired and set on bridge plug at -9525' MD. Shear off of whip-stock. 17. Displace the well to the 8.4 ppg Flo-Pro milling/drilling fluid, mill the window and then drill an additional 20' formation and perform FIT to 10.1 ppg EMW. a4'`1-~ \~ Q~ ~~~ 18. RIH with 6 1/8" TCI bit / motor assembly with GR/Res/ABI and drill ±10,470' MD to land in horizontal section in Z2A. CBU, POH. ~ 19. RIH with PDC / motor assembly with real-time Neu/Den. 20. MAD pass build section from TD of the 1 St bit run back to 100' above PGOC per the well-site geologist and continue drilling to TD at ±12,042' MD. 21. Circulate, short trip, spot liner running pill, POOH. 22. Run and cement a 4'/2", 12.6#, L-80, IBT-M solid production liner. POOH. 23. RIH with 2-7/8" perf guns and perforate ±600'. POH and LDDP and perf guns. 24. R/U and run 4 1/2", 12.6#, 13Cr, VamTop completion tubing. Land the tubing RILDS. 25. Reverse circulate inhibited seawater to the packer depth. 26. Drop ball & rod and set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test 27. Shear the DCK valve and pump each way to confirm shear. 28. Set a TWC and test to 1000 psi. 29. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. Pull TWC w/lubricator. 30. Freeze protect the well to ~2,200' 31. Install BPV and secure the well. 32. Rig down and move off. Post-Riq Work: 1. Install well house and instrumentation. 2. MI / RU slick-line. 3. Pull the ball and rod / RHC plug from landing nipple below the production packer. 4. Install gas lift valves. F-09B Sidetrack Page 5 . ~- i F-09B Potential Driliinq Hazards (Post on Rig) • Pre-job HAZOP's and Safety meetings are recommended when there is a clear change in work scope. If at any time things don't feel or look right, STOP the job and discuss the situation before making the next move. • Flash Points o Dead Crude= <40degF o Methanol (neat)= 52degF o Diese1=100degF • Hydrogen Sulfide o F-Pad is not an H2S pad. However, Standard Operating Procedures for H2S precautions should still be followed at all times. o Closest SHL Well: F-29A - No Data / F-17 - 10 ppm o Max H2S reading: F-24 & F-39 w/100 ppm on 06/5/98 • Bottom Hole Pressure 0 3180 psi (~6.9 ppg) @ 8800'ss o The 8.5 ppg drilling fluid will provide a 710 psi static overbalance in the reservoir. • Maximum anticipated wellhead pressure: 0 2300 psi w/ full column of gas • Potential for loss circulation o Moderate • Faults -(F-09B is not expected to cross/intersect any mapped faults.) o Wellbore passes between two faults, coming within ~200' • Close Approaches o F-15 - 800' ctr - ctr ~9835' MD o F-17A - 418' ctr - ctr ~10409' MD o F-17- 793' ctr - ctr ~11413' MD o F-29- 714' ctr - ctr ~10754' MD o J-05A- 216' ctr - ctr ~11912' MD F-09B Sidetrack Page 6 I T,REE= ~ 6' CNV WELLHEAD= McEVOY ACTUATOR = OTIS KB. ELEV = 67.32' BF. ELEV = KOP= Max Angle = 38.17' 3200' 99 ~ 70416' Datum MD = 9863' Datum ND = 8800' SS ~ SAFETY "'9-5/S" CSG WAS CIIT L 2030'. 7", 25#, IJ4S WA~BACK @ 8902' AND RAN TQ SURF. 7" WAS F~O 9 UNG IN OLD 9-l58" CSG SPOOL W/7" SLIPS"` I 13-3/8" CSG, 72#, L-80. ID = 12.347" I 2700~ ~rr~o~v: nAr~a~~,aR~ FROr~ F-za co~~os~on~ 2930~ rr Minimum ID =1.92" a~ 8764' 3-1/2" BKR DEPLOYMENT SLV 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" ~~ 8785~ ST MD ND DEV TYPE VLV LATCH PORT DATE 5 3188 3132 11 McMURRY DMY BK2 0 01/09/06 4 5324 5023 34 McMURRY DMY BK2 0 01/09/06 3 7144 6524 36 McMURRY DMY 8K2 0 2 8242 74U3 38 McMURRY DMY BK2 0 1 8364 7499 38 McMURRY DMY BK2 0 $72$' 3-1/2" OTIS SLIDING SLEEVE, ID = 2.75" $72$' 3-1/2" PX7TP(01/20/06) $7rj$' 3-1/2' BKR DEPLOYMENT SLV, ID= 1.92" 8785~ BOT G SEAL ASSY W/ LATCH (BEHIND CT 88~ BOT 3-H PKR W/ MILLOUT IXT (BEHIND CT ~ ELMD TT NOT LOGGED ~, 7" TNV PKR TOPOF7" LNR (150 SX CLASS 6 ACROSS TB PKR) 9-5/8" CSG, 47#, L-80, ID = 8.681" 8902' 9~ 390' ~ PERFORATION SUMMARY REF LOG: BHI GR ANGLE AT TOP PERF: 83 ~ 10198' Note: Refer to Roduction DB for historical perf data S¢E SPF INTERVAL Opn/Sqz DATE 1.56" 6 10198 - 10248 O 05/18/04 1.56" 4 10380 - 10620 O 01/02/02 1.56" 6 10663 - 10738 O OS/18/04 9500' ~TOPOF CMT f'LUG 9823~ TOPOF WINDOW 10182' MARKER JOINT 10946' I~ PBTD I I 7" LNR, 29#, L-80, .0371 bpf, D= 6.184" ~~ 10292' 10981~ ~~2-3/8" LNR, 4.7#, L-80, .0039 bpf, ID= 1.995" ~ DATE REV BY COMMENTS DATE REV BY CAMMENTS 12/07/79 ORIGINAL COM PLETION 05/10/06 CAZ/TLH MAJOR CARRECTI~NS 0'I/OZ/02 DAC/KA CTD SIDETRACK U3/20/02 GRGTLH LINER ID CORRECTION OS/08/04 BAAcL/KK ADPERFS 01/17/O6 DTR/PAG GLV GO 01/20/06 KSB/TLH PXTTPSET PRUDHOE BAY UNR WELL: F-09A PERMfT No: ~2011980 API No: 50-029-2~403-01 SEC 2, Ti i N, R13E BP 6cpbration (Alaska) 1980~ --I3-1/2' OTIS SSSV LAND NIP, ID= 2.75" 2030~ TOP OF 9-5/8" (CUT 8~ TOP PULLED GAS LIFf MANDRELS T,REE _ , 6' CNV WELLHEAD= ACTUATOR = McEVOY OTIS KB. ELEV = . 67.32' BF. ELEV = KOP= 38.17' 3200' Max Angle = Datum MD = 99 ~ 10416' 9863' Qatum N D= 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" SA ES:'"'9~/8" CSG WAS CUT @ 2D30'. 7", 25#, IJ4S W BACK ~ 8902' AND RAN TO SI~iF. 7" WAS HUNG IN OLD 9-l58" CSG SPOOL W/7" SLIPS'** ~ F-09B PROPOSE 2030~ HTOP OF 9-5/8" (CUT & TOP PULLED ?DATE?} 4-1/2" X-Nipple (3.813" ID) --2201` MD I 2700' I ~cAarr~oN: ~~n~~Ea~~t~ ~~cc~~ F-~o coL~ossara I-~ 2930' GAS LIFf MANDRELS iT MD ND DEV TYPE VLV LATCH PDRT DATE 2 3410 3400 KBG-2 DCK 1 62Q4 5800 KBG-2 Dumrry GLM Program - (To Be Developed) Minimum ID = 4-1/2" XN Nipple (3.725" ID) at 9296' MD TOP OF 7' LNR $9Q2' (150 SX CLASS 6 ACROSS TB PKR \ BOT S-3 Packer (7" x 5") -9250' MD 9-5/8" CSG, 47#, L-80, ID = 8.681 ^ 9390~ _ BOT HMC/ZXP Packer-9313' MD/ BOT 7" Whipstock -95223" MD HES EZSV --9525' MD \ 9525~ TOP OF CMT PLUG - CIBP in 2-3/8" Liner -9905' MD PERFORATION SUMMARY REF LOG: BHI GR ANGLE AT TOP PERF: 83 ~ 10198' Note : Refer to Roduction DB for historical pert data SQE SPF INTERVAL Opn/Sqz DATE 1.56" 6 10198 - 10248 O 05l18/04 1.56" 4 10380 - 10620 O 01 /02/02 1.56" 6 10663 - 10738 O OSl18/04 7" LNR, 23#, L-80, .0371 bpf, D= 6.184" ~~ 10292' 4-1/2", 12.6#, L-80, IBT-M Production Liner (Fully Cemented) set at 12,042' MD / 9019' TVD) ITOPOF WINDOW I 10182' MARKER JOINT 10946' PBTD 10981~ 2-3l8" LNR, 4.7#, L-80, .OQ39 bpf, ID= 1.995" DATE REV BY CAMMENTS DATE REV BY CAMMEMS 12/07l79 ORIGINAL COM PLETION ~5/10l06 CAZ/TLH MAJOR CORRECTIONS 01l02/02 DAC/KA CTD SIDETRACK 8/23/06 jgr F-09B sidetrack 03/20/02 GRGTLH LINER ID CORRECTION OS/08/04 BMcUKK ADPERFS 01/17/06 DTRlPAG GLV GO 01l20/O6 KSB/TLH PX TTPSET PRUDHOE BAY UNff WELL: F-096 PERMff No: 2011980 API No: 50-029-20403-02 SEC 2, T11 N, R13E BP 6cpbration (Alaska) - 4-1/2", 12.6#. 13Cr, Vam Top Completion to -9317' MD (WLEG into 4-1/2" Liner Top) ~ 4-1/2" X-Nipple (3.813" ID) -9229` MD - 7" TIW PKR - 8899' MD - 4-1/2" X-Nipple (3.813" ID) --9275` MD -4-1/2" XN-Nipple (3.725" ID) -9296` MD ~ TOW - 8320' MD TOW -9500` MD ~ g F l- F ^i ~ a o q Gp °O F u. i+. W P U 11~~NMV~r+fvfPOo ~ ~ = N NVl~Ol~QI~VI~CP ~ ~ fA ~ O~~IO~n000 R~e~~~o~~ ~~~°~°'~~~.., °' a aocv, $ 3~ ~ 3 V ~ z ~ "! oono-~~oo 0 ~ ~ s ~ I-k+ °ev°.°'no~coo.PO~o a s ~ ~ ~ m g < P ~ O O O O O O O O O O LL ~ ~y Z J 0000000000 ~ Q O~IOO~~IOQQO a ° ~ ~' ~ 3 ~ ~ ^ ~~~e~ ;~~~~o m ~ - ^QP~OPC~1~-~.O L ~ Q ~ O~OOOnmooPrnQ ~ PPnOOO~O ¢ NNrIr.Irne~OTQV~ v 0 '~ z G , ci3 ~` ZO v~ ~o o~c - m,o a o m,c - a~i~n~io.o~n~nnrv ~j '~ F, Z o~o ~c v, c~c ~o e o 0 3 V ~ ~ W ~PPPPPaO y N r~_°_~~~. ' ~~ ~ Z < ~ ~o°;~°~~°~° ~ v .c~noov~r,orr.cc 3 ~v~inm000000 8 ~ 000oo0o0PPPPPP 3 < ~ '^ ~N o~oocov~rov,v, + o a ~oao~o.oo~o~oo~u ri r rv rv vi r r n v~~ri N N N N~ N N N N N ~ N ~ i CviviO~nviOOOOo (' g e-~.?~nooomooo }[ > O^ PO~000~-~~ ~ ~ ~ 3, 1Mr~TPPPPP Z 4' p OOnCSOOivOr1 j ~ a OOn~n~nORr~~O ~ ~ '~' oOrn~nCPNOOr~- y p O~`1mm~0~00~10 LL PPPPOO~~~~` ~ ~ ~ ~ ~ ~ ~ ~ y ~ fA .-.NrnQVi~O1~mP~ H L.l ~ E ~ Y 9 ~ ; ~ ~ s- ~ cn 0 Z .rc y Cz ~~ ~ O ~a T~ =Z= ~ C . ~ r ~ ~ U ° O U ~ ~ ~ ~. .. v`ot ...5 W 3a ai ~a occ °n iia' .. ~ V ~ L~~~~ ~~b :a o00 g o00 ~ ~u~ oCa~'oC'y~e W aa~ y o wC ~ .eo~~ _ . ~ ?~ I i -i "2 ~'U c ~w U ~ ~ :n o00 ^ o00 .a O v~ ~n . , d~ ~ !,J O RMN y Z, N N /`1 ~ O~ P P Q H h h H W ~ 3 on~ `+ U I. .~ `,:~ ° °c ' e C , , Q ' F ~ N~o ~ ~~g ? °-oo°~o ~ ~ v N °_° _°: °: V ~ ~ 5? u ~ ~ ~ ~ q o00 6 ~i ~ ~ c e° ~ ~ ~- °'MQ ~ F-W } f ~~~ m ~~~ O N F- r t= ~ ~ ~t ~ 3 ~ ~ ~ mmm o O o z ~. ~. ~ ~ ~ Z m ° ~~ ~ ' N~ > ~ ~ L ~ N ~i ~ ~ ~ ~ ~' ~! c z e ~ o ~ ~ L ~ O ~ C¢i C o ~ L ~ P Q ~ O ~ c = a ~ a z . m ~ VI O ~zFN~N ~~5 ¢ `° °¢a~~zz`~ ~ rn N U C.+ ~n ~ u. F F l- m r ~i a O ~ OO V 1 O~ P~? 0 Z 0 ~~~~~~~ O ~ cc~o~cco°c Q c L O O O O O O O G A r+l ~+1 M'+1 N1 M~+1 p a ~=o~.'~no~~ ~ ~ m~~o~o~z~ O z ~CIM7vi~c~ I ~ ~~!.M1JOOti~ qldap ~ea~uaq an,y ~I::.~ ;=~=~IIi~::;I~;'.'~;:j~ O c C O O O ~ O R A O u ~ ~ ~ > ~ a 0 ~ ~ ~ 2 tl ~, ~ v °q U p ~ ' m O ~ . . . . . . . . . . . . . . . . o "R " F F Q o ~ s o F a°¢~voUzz O v~NCJ ~ L r' /~~ ~ = m ' u r~n.. a G O TC W !a. i.. I- F Oi~irv ~ ~ W . . . ~' . . . . . . . . . . . . . . . , . . . . . . ~ % .~ 3 0000 ~ aaan. °~ O ~ r~OmPPO ~ L . . ~~ . . t . . _ ~,, ~ ~ d . x s= s o000 a aa-o-cw o Qc~~~~~oo C P P P P P O O ~ m= . . . . g -~ . . . ±~ . . ~ ~~ ~ j .O V ~ vOi ~ "l O ~.. L . . . . . . . . ~ ~ ~ W ~~ ~ 2 O O O O O O O 4 ~ O . . ~ ~ e ° - ~. c~~ a r_~a=c,c ° > ~ . . . . . . . . . . . . . . . o ° T ~ ~mm~~m~ J ~ ~ ~ ~ ri C 0000 mn ~ ~ _N z rnKN~Ot~ ~ L ~ . . . . ~ . . . . . , . . . ~ ~ ^ N ^ IC ~ y z Q ~ ~ . . ~ . ~--4 ;, ~ ~ . . - . . . ~ ~ ; ¢ ~ ~ ~ ~ ~ : - ,; / _ m ~ .9 ~ p ~ ~~ ~ I , ~ ~ 3 onoN o . i . ~~ . . . . . . I ~ _ . F- v o . . U [[7 ~O ; V ~ Q P m r + O O ~ n C~r ~, e ,., .~, y ~ . . . . ~' . . , . . ~ ~ . . . . . . . ~ ° -0 ~ a F~ . . . . . P ~ . . . . ~ .. . ~ . . . . . o ~ N ~O ~ . . . i ~ . / . . ~ p ~ P ~Z O m ~ . Z OOO mrnma . . . . . ' . _ . Y ~ F . . ~ v X ~f~ ~~ ~ o F, I P 3 q o 0 0 o ~ ~ ~ -.. , - ,o / I/ ~. I ~ ~ ~ o . ~ I v, ~ ° ~ ~ ~ P~ rn ° ° ° o z ~ Z ~ ,.; . . . ,, ~ ~ ~ ~ ~ ~ - a ~ a °o . . . . C . ~ , . d . ~~ ~~ . . ~~. ~ ~ _ ~ o CO ' I Y ~ °o g 3 F y ~ Z o- ~=- i= o• t- U Q N ~ - . ° a ~ G . ° _ t u. . . . . ~ r + ~ u ~7 a1 G7 C7 ~ p > > . ,'y.~ ~ . . - . ~ ,'L ~ o 0 0 0 ' ' i L ~ . . , g ~ ~ k- T I ~ ~ ~ ~ ~~. Z W Z t+. t . 4. [ . Q P . _ , O ~ N . . ~ . ~ r ~ I ~ ~ F P ~ ^ P ~ ~ .~~. "CJ . -~ ' I I ! I .. rv > ~ 7. • ~ ~ ~ ~ Q ~ ~ e ~ t _ • ~ , ~ Yr ~, . O N > F . ~. . . . . . , . . O W > Q rn ao N ~ ' C ~ ~ . . . . ~ T P ~ ~ . . . . . . . . . . . ' ~~+ O ~ ~ ~ . N o ~" p . . . , . . . . . o y yy ~j' ~ j . . . . . . . . . . . . . . I P O ~ r;. Q ~ ~ ~ . . . . . . , I . . . . . . . . . . . ~ v N L . . . . _~ ! . . . I . I_ _~-~_ r__I ' ~ ' ~ r t I i ~ ~ ' . . . . . . I C F . ~ F' L . . . . . . . . . . . . . . C~ ,o P . . . ~. . . . . ~ ~ ~ . ~ ~ . . . . . . . ~ F w 3 o - m o E u. g . . 'o . . ° °' , r, p~ _ 6 T . . . . . . ~ . . . I I . . . .. u. F F+ F ~ i k ~. .-i' ~ , ~ ~ ~ ~ ~ ~ o 00 . ~ ; ~. w w ~. ~- ~ ~ , ~ - ' ~ ~ z~ N e~~~e~~_~P > o~,o.~~oo ~ 0 r- ; o _ ~ ~_~~ ~,~.i r+1~+1rm~1rP+~r~~1PR?~V~i . . . . . . . . F- '' . ~ - t I .~ . . . . . . . ? Q ~T~a_ . . . . . . . , . . . N i .. ~~ . . . ~ . . ~.. ~=Y~~ '~U ~ 001~0-+rvooRO OO~O~~OPRO . i I . . , . , . ~ ~, . r ~ O ., __ _ . . '~ . ~ ~ .. ~~~~~ ~ 4. Ooo OM~OO~D~00 ~.., a c oo ~ ~ ~ ~ ~ I _ ~ _ _ I ~ ~ ~ ~ ~ ~ ~ .. ~ ~ ~ ~ _ ~ ~~~ . . ~ ~c . ~ ~ ~ ~ I ~y 3T.na~ v o000000000 0000000000 . . ~ , , , , ~ a ~ ~ i i _ _ Z N ~N N n~ ~ e c~v es v u ~ ~ "'1 ONOONNOQRO ~ ~ ~ .-• ~ . . '. . .. . . . . , . . ~. . . , . . . . . O ~ ~ '~ ~ .I -- . . . . . , . I - -. I ~ ~ . O yv y ~. ~ ~.. ~y y. ~ y' OG fL C' O o r ~ hl 00 00 n n~n rn O T y 3 ~oocr,N~cn,ro ~ . . . . ~ . . . . . . O r'~ ~. p _ . II ~ ! I , 1 , . . I . . ... ~ mONLA Z~'~3 a ~ QP.oPV-~_.c Q ~ ~ PPr^nV'00~~ ~ . . . . . . , . , . . , . . . . ~ e~ _ ~ ~ ~ II_ ~ I ~ I I _ _ . . . . . I . ~.. ~~ O ~ i~~ t~! rr r+i V~t R . I ', . ~ ~. I . _ . ' . ' ~ ~' ` q N U O I } I j- P '• ~ I ~ ~ ~~ I II ~vN'~ ~ ~ ~ Z V) ~00~0-oo~GPOOO~O O . P N ~n ~1 O ~O ~n ~n 1~ hl 0 ~ ~ . . . . I ~ ~ O. VI C ~ ({] ;~~ I .. - . . . . . . ~ I .. ~mmmm0~0 V Z P P C P P ao . . , . . . . . . . . . . . . . . . . . . ~ ... . . . . . ~ . . . . , . . . . . . . . . . ... . . . . w N ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ . . . . . . . . . . . . . . . . . . . . ~ C P r O ~ M ~ D~ Q V ~nv i~D i ~ M R F . . . . . . . . . . . ~ ; . . . ~ . . . . . . i 3 ~ m W r P~P ae P ~ . , . . . . ~ . . . $ . . : ; ' m ~ , ., , . ., . _ ~- Z ~ ~ U a0 OOO o ~ . . . . . . . _ _I , . j ~ C] . I_JI . . . , o _ ~ ' ~ -~~- m i ' _ - _~ J v 5* Y a ~<-~ r m ~r7 o.cacoevo~n~n Q .~~.~~o.~.~o.~~ rr~r~~nn~n~nv~ . . . . . _I ,~ . ~ G . S ~ I ~ ~" ~ a a ~. ' I , . o +~i ~~3> a',(~' ~ ~ ~~n..~.--,crrrrr Nt~1~1~1~1~IN~lNN . . . . . . . . , . . . ._ . . ~ ~ _ _- - ~ . .- . . , . ~ ~ ~.. f" [Y ai z a $ e m ++ ~ R~n~nO~n~nOOOOo .S R~~n~nOaooo000 . . . . . . . . ~, . . . . . . . ~ . . . . . . . . . . . . . . p L O ~~~N~ Ot`IPPO00--~ NN~'~'~MPPPPPP ~ u n e~ 9 p ~y C~ ~~ Q O O ~ R C O O N O N ~ OOI~v~-~ORN~O ~ I 3 3 °oe°~.` .;o~'o.ao~onm~iv PO~PPOO~~~N ~ O ~ O V ~ ~ ~ ' r K ~ L o rn ..r~.ne~n.orooa- - - - ~ ~ [~!:~JOOEI (+)4 u~N/(-14~°OS ~ Sperry-Sun BP Planning Report ~ Companyti BP Amoco Date: 8/21i2006 Time: 10:18:08 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Wefl: E-03, True North 'Site: ` PB F Pad Vertical (TVD) Reference: 9: 0911/15/1979:00:00 67:3 WeIL• F-09 Section (VS) Reference: Well (O:OON,O.OOE;25026Azi) Wellpath: Plan F-096 Survey Calculation Method; Minimum Curvature Db: OraGe Plan: F-096 wp04 Date Composed: 8/14/2006 Version: 42 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2005 Site: PB F Pad TR-11-13 UNITED STATES : North Sl ope Site Position: Northing: 597252729 ft Latitude: 70 19 55.283 N From: Map Easting: 650960.70 ft Longitude: 148 46 31.468 W Positio~ Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.15 deg Well: F-09 Slot Name: 09 F-09 Well Position: +N/-S 1784.41 ft Northing: 5974332.00 ft Latitude: 70 20 12.832 N +E/-W 1033.49 ft Easting : 651958.00 ft Longitude: 148 46 1.285 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 12041.00 9019.31 4.500 6.125 4 1/2" Formations MD TVD Formations Lithology DipAngle Dip'DirecHon ft ft deg deg 9599.78 8617.30 TSAD / TZ46 0.00 0.00 9699.15 8701.30 TZ4A/42N 0.00 0.00 9771.01 8757.30 TCGL / TZ3 0.00 0.00 9870.87 8834.30 BCGUTZ2 0.00 0.00 9961.99 8901.30 25N / T26 0.00 0.00 10064.90 8964.30 22N/2A 0.00 0.00 10088.04 8976.30 PGOC 0.00 0.00 0.00 MHO/HOT 0.00 0.00 Targets Map MaP <--- Latitude -> <- Longitude --~ Name Description 1'VD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min ' Sec Dip. Dir. ft ft ft ft ft F-096 T3 9019.30 -1810.26 -5046.09 5972420.00 646950.00 70 19 55.012 N 148 48 28.623 W F-096 T2 9037.30 -1904.50 -4097.73 5972345.00 647900.00 70 19 54.090 N 148 48 0.931 W F-096 Poly 9042.30 -1881.98 -3383.08 5972382.00 648614.00 70 19 54.315 N 148 47 40.064 W -Polygon 1 9042.30 -1881.98 -3383.08 5972382.00 648614.00 70 19 54.315 N 148 47 40.064 W -Polygon 2 9042.30 -1792.73 -4035.45 5972458.00 647960.00 70 19 55.190 N 148 47 59.114 W -Polygon 3 9042.30 -1772.02 -5057.32 5972458.00 646938.00 70 19 55.388 N 148 48 28.951 W -Polygon 4 9042.30 -1848.09 -5054.86 5972382.00 646942.00 70 19 54.639 N 148 48 28.878 W -Polygon 5 9042.30 -1996.61 -4340.67 5972248.00 647659.00 70 19 53.183 N 148 48 8.022 W -Polygon 6 9042.30 -2081.69 -3893.27 5972172.00 648108.00 70 19 52.349 N 148 47 54.958 W -Polygon 7 9042.30 -2126.15 -3378.02 5972138.00 648624.00 70 19 51.914 N 148 47 39.914 W F-09B T1 9047.30 -1989.08 -3379.25 5972275.00 648620.00 70 19 53.262 N 148 47 39.951 W . ~ Sperry-Sun BP Planning Report Company: BP Amoco Date: 8/21/2006 Time: 10:18:08 Page: 2 Fieldc' Prudhoe Bay Co-ordi~ate(N E) Reference: Well: F-09, True North Site: PB F Pad Vertical(TVD) Reference: < 9: d911/15/1879 00 :00 67:3 WeR: F-09 Section (VS) Reference: Wetl (O.OON,4.OOE,250.26Azi) Wellpath: Plan F-09B S urvey CalculaaonMethod: Minimum Curvature Db: OraGe Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build '1'um TFO Targe[ ft deg deg ft ft ft ` deg/100k deg/1AOft deg/100ft deg 9500.00 20.47 262.60 8526.41 -1754.96 -2807.72 0.00 0.00 0.00 0.00 9520.00 22.14 257.86 8545.04 -1756.20 -2814.88 12.00 8.37 -23.68 -48.00 9733.77 39.55 232.64 8728.59 -1806.56 -2909.47 10.00 8.14 -11.80 -48.17 9885.54 39.55 232.64 8845.61 -1865.21 -2986.28 0.00 0.00 0.00 0.00 10364.14 90.00 265.00 9047.30 -1989.08 -3379.25 12.00 10.54 6.76 39.41 F-096 T1 10469.70 90.85 277.64 9046.51 -1986.66 -3484.57 12.00 0.81 11.97 86.12 11072.00 90.85 277.64 9037.57 -1906.59 -4081.45 0.00 0.00 0.00 0.00 11088.42 91.00 277.00 9037.30 -1904.50 -4097.73 4.00 0.91 -3.90 -76.90 F-09B T2 11122.20 91.08 275.65 9036.69 -1900.78 -4131.30 4.00 0.25 -3.99 -86.44 12041.62 91.08 275.65 9019.30 -1810.26 -5046.09 0.00 0.00 0.00 0.00 F-096 T3 Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE ToollCo ft deg deg ft ft ft ft ft deg/100ft ft ft 9500.00 20.47 262.60 8526.41 8459.11 3235.42 -1754.96 -2807.72 0.00 5972520.64 649186.62 Start Dir 1 9520.00 22.14 257.86 8545.04 8477.74 3242.57 -1756.20 -2814.88 12.00 5972519.25 649179.49 Start Dir 1 9599.78 28.07 245.17 8617.30 8550.00 3276.23 -1767.26 -2846.66 10.00 5972507.55 649147.94 TSAD / TZ 9600.00 28.09 245.14 8617.50 8550.20 3276.33 -1767.31 -2846.76 10.00 5972507.50 649147.85 MWD+IFR 9699.15 36.49 235.19 8701.30 8634.00 3328.17 -1794.01 -2892.25 10.00 5972479.88 649102.90 TZ4A/42N 9700.00 36.56 235.13 8701.98 8634.68 3328.66 -1794.30 -2892.67 10.00 5972479.59 649102.49 MWO+IFR 9733.77 39.55 232.64 8728.59 8661.29 3348.61 -1806.56 -2909.47 9.95 5972466.99 649085.95 End Dir : 9771.01 39.55 232.64 8757.30 8690.00 3371.21 -1820.95 -2928.31 0.00 5972452.22 649067.40 TCGL / TZ 9800.00 39.55 232.64 8779.66 8712.36 3388.80 -1832.15 -2942.98 0.00 5972440.73 649052.96 MWD+IFR 9870.87 39.55 232.64 8834.30 8767.00 3431.81 -1859.54 -2978.85 0.00 5972412.62 649017.66 BCGUTZ2 9885.54 39.55 232.64 8845.61 8778.31 3440.72 -1865.21 -2986.28 0.00 5972406.80 649010.35 Start Dir 1 9900.00 40.90 234.32 8856.65 8789.35 3449.66 -1870.76 -2993.78 12.00 5972401.10 649002.96 MWD+IFR 9961.99 46.94 240.60 8901.30 8834.00 3491.55 -1893.75 -3030.05 92.00 5972377.38 648967.17 25N ! T2B 10000.00 50.79 243.86 8926.31 8859.01 3519.89 -1907.06 -3055.38 12.00 5972363.56 648942.11 MWD+IFR 10064.90 57.53 248.67 8964.30 8897.00 3572.33 -1928.13 -3103.53 12.00 5972341.52 648894.40 22N/2A 10088.04 59.98 250.20 8976.30 8909.00 3592.11 -1935.08 -3122.05 12.00 5972334.20 648876.03 PGOC 10100.00 61.25 250.97 8982.17 8914.87 3602.53 -1938.54 3131.88 12.00 5972330.54 64886627 MWD+IFR 10200.00 72.02 256.75 9021.80 8954.50 3693.95 -1963.83 -3219.93 12.00 5972303.48 648778.76 MWD+IFR 10300.00 82.94 261.86 9043.46 8976.16 3790.16 -1981.82 -3315.70 12.00 5972283.55 648683.39 MWD+IFR 10364.14 90.00 265.00 9047.30 8980.00 3852.43 -1989.08 -3379.25 12.05 5972275.00 648620.00 F-09B T1 10400.00 90.29 269.29 904721 8979.91 3886.74 -1990.87 -3415.06 12.00 5972272.49 648584.24 MWD+IFR 10469.70 90.85 277.64 9046.51 8979.21 3950.75 -1986.66 -3484.57 12.00 5972275.29 648514.66 End Dir : 1 10500.00 90.85 277.64 9046.06 8978.76 3977.65 -1982.63 -3514.59 0.00 5972278.71 648484.56 MWD+IFR 10600.00 90.85 277.64 9044.58 8977.28 4066.44 -1969.34 -3613.69 0.00 5972289.99 648385.22 MWD+IFR 10700.00 90.85 277.64 9043.09 8975.79 4155.23 -1956.04 -3712.79 0.00 5972301.27 648285.88 MWD+IFR 10800.00 90.85 277.64 9041.61 8974.31 4244.02 -1942.75 -3811.90 0.00 5972312.55 648186.53 MWD+IFR 10900.00 90.85 277.64 9040.12 8972.82 4332.81 -1929.46 3911.00 0.00 5972323.83 648087.19 MWD+IFR 11000.00 90.85 277.64 9038.63 8971.33 4421.60 -1916.16 -4010.10 0.00 5972335.12 647987.85 MWD+IFR 11072.00 90.85 277.64 9037.57 8970.27 4485.53 -1906.59 -4081.45 0.00 5972343.24 647916.32 Start Dir 4/ 11088.42 91.00 277.00 9037.30 8970.00 4500.15 -1904.50 -4097.73 4.00 5972345.00 647900.00 F-096 T2 11100.00 91.03 276.54 9037.09 8969.79 4510.51 -1903.14 -4109.23 4.00 5972346.13 647888.48 MWD+IFR 11122.20 91.08 275.65 9036.69 8969.39 4530.49 -1900.78 -4131.30 4.00 5972348.04 647866.37 End Dir : 1 1 11200.00 91.08 275.65 9035.21 8967.91 4600.77 -1893.12 -4208.71 0.00 5972354.13 647788.82 MWD+IFR 11300.00 91.08 275.65 9033.32 8966.02 4691.09 -1883.28 -4308.21 0.00 5972361.96 647689.15 MWD+IFR 11400.00 91.08 275.65 9031.43 8964.13 4781.42 -1873.43 -4407.70 0.00 5972369.78 647589.49 MWD+IFR 11500.00 91.08 275.65 9029.54 896224 4871.75 -1863.58 -4507.20 0.00 5972377.6T 647489.82 MWD+IFR 11600.00 91.08 275.65 9027.65 8960.35 4962.08 -1853.74 -4606.70 0.00 5972385.44 647390.15 MWD+IFR 11700.00 91.08 275.65 9025.76 8958.46 5052.40 -1843.89 -4706.19 0.00 5972393.26 647290.48 MWD+IFR 11800.00 91.08 275.65 9023.87 8956.57 5142.73 -1834.05 -4805.69 0.00 5972401.09 647190.81 MWD+IFR 11900.00 91.08 275.65 9021.98 8954.68 5233.06 -1824.20 -4905.19 0.00 5972408.92 647091.15 MWD+IFR ~ent • ~ Sperry-Sun BP Planning Report Alaska Department of Natural Resources Land Administration System Page 1 of 2 ~ ~ ~ ~, ~~~ a,~ ,,, ~,~~ ~~ .,~,4 s ~~ ~ ~ ~ ~~ ~~ ~ ~- ~ ~ ~ "' ' ,-' ~ `~~~~r~[e~`s ~~arc~ ~ta~e ~abins ~t~tur~1 i~es~~r~aes ~ ~ ~,~,~~~ ~~ ~.~~,. a~ . , ~ a 5 ~~l S ~ +'11"~/ File Type A~~ _= File Number: „ ?$?$1 ~ ~ Printable Case File_Summ..a..ry See Township, Range, Section and Acreage? ~~. <. .,:ax~ . - `~= ~ ~ ~` Yes ~~ No ~nd c~~ ~~s~ Summ~r~ Last updated on 01/3012007. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28281 &... 1 /30/2007 Alaska Department of Natural Resources Land Administration System Page 2 of 2 ~ ~ Not sure who to contact? Have a question about DNR? Visit the Publie Infc~rrr~a~ion Center. Report technical problems with this page to the `~Uebm~ster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all ~QC~KI~_S must be accepted. Stafe. pf Alaska Naturai Resourc,~s LAS Home Gopyright Privacy System Stat~s _ _._ _ http://www.dnr. state.ak.us/las/Case_Summary.cfin?FileType=ADL&FileNumber=28281 &... 1 /30/2007 Sondra D. Stewman BP Ex~loration AK INC. PO Box 196612 MB 7-5 Anchorage, AK 99519-6612 PAY TO THE ~~/} ORDER OF ( ' ~ u "Mastercard Check" ~ ss-si,zsz 1 56 OAT~f ~ L3.S/ ~~ _ , $ ~ , ~"_"' l ~`-' ! ~~i , tirl rr~r~ .~ ~ ~h~--~ `~~~~ IvBi110R3~ C9(lk Alaa4 , DOLLARS ._ __'_' . _._...... A~ age, AK 99501 MEMO ' .~ ~: L 2 S 200060~:99 i46 2 2 7 L 564~~' O i 56 i ~ ~ TR~~;S:~~II~'~':~~. L~~'T'ER C'H~C~CLIST `~~~~,a. d ~vt~ .o,BL/ ~" O~'B ~~'~# ~?O~ Ol3 ~Devetopment Ser-vice Exptoratory Stratigraphic Test von-Conventiona( W'ell Cir~le Appropriate Letrer ' Paragraphs to be included in Transmittat Letter CHECK aDD-Oti S w'H.aT ' (OPTIOtiS} ~ ~PPLIES ~ ,LiL"LTI LATER4L ( [f last t~,~o digits in , .-~P[ number are ben~een 60-69) TEXT FOR :aPPROVAL LETTER The permit is for a ne~v we(tbure ~egment of eYistin~ we I I Permit ~io. , AP[ ~o. ~0- - _ Production ~hould continue ta be reported a; a function of the ~~ri~ina( .aP[ number stated above. PILOT HOLE (n accordance with 20 .=~,~C 2~.00~(~, all records, data and lo~s ' : acquired for the pilot ho[e must be c(earlv differentiated in both i , ~vell name ( PH) and AP[ number ~ ; { ~~' - -_~ from records, data and (o;s ; acquired for we(l ~ SP:~C[iVG . EXCEPTIO\ The permit is approved subject to fult comp(iance with 20 AAC ; 2~.0~5. Approval to perforate and produce - inject is contin~ent , upon i;;uance of a conservation order approving a spacing exception. assume~ the i !iabilit~ of an~ protest to the spacin; exception that may ~ccur. DRY D[TCE{ `.~If drv ditch sample sets submitted to the Commission must be in SA~IPLE no ~reater than 30' sample intervals from belo~.v the permafrost or from ~vhere samp(es are first cau~ht and f0' samp(e inter~als through target zones. tivn-Conventional Please note thz following special conclition o[ thi~ permir. " ; ~ z~l production or production testin~ of coal bed methane is not allowed < ' Por (name oF ~vell) until after (Com~anv tiame} has designed and ; impfemented a water we[! testing program to provide baseline data ~ ' on ~vater qualit;~ and quantity. (Companv iv`ame} must contact the ' : Commission to obtain ad~ance approval of such water we(I testing ' pro;ram. R~~ 1 25, 06 C jody transmiral check,i;~ Field & Pool PRUDHOE BAY, PRUDHOE OIL 640150 Well Name: PRUDHOE BAY UNIT F-096_..__ ______Program DEV Well bore seg [j PTD# 2070130 Company BP EXPLORATION~ALASKA~ INC _ __ Initial Class/Type DEV 1 PEND _GeoArea 890 __ ___________. Unit 11650 ___ OnlOff Shore On Annular Disposal i'_; Administration 1 Permit fee attached ___ . Yes . . . 2 Lease number appropriate _ _ Yes . _ _ _ . 3 Uniquewell_nameandnumber_____________________.__„__ _________Yes____ ___. - - - - - -- 4 Well located in a_defnedpool_ _ Yes _ . 5 Well located proper dis#ance from drilling unitboundary_ . Yes ____ 6 Well loc~ted properdistance_f[om otherwelis_ _ _ . _ _ Yes _ . _ . 7 Sufficient acreage avail_able iqdrilling unit _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ 8 If deviated, is_wellbore plat_included ,. Yes __ __ , 9 Operafor only aff.ected party_ _ _ Yes _ _ _ , . . . ~I 10 Operator has_appropriate_ bond in forr,e - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - 1 11 Permit_can be issued without conservation order_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ Appr Date I 12 ?ermit_can be issued without administrative.approval ___ Yes __ . ACS 1/30l2007 ~1 13 Can permit be approved before 15-day wait Yes 1 14 Well Iocated within area and strata authprized by_InjQCtion O[der# (put10# in_comments).(FOr_ NA_ ___ ~ 15 All wells within 114_mil_e area of reyiew identified (For seruice wel_I only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ . _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ , - -' - -- - -- - - - - '~ 16 Pre-produced injector_ dur_ation of pre production less than 3 months_ (For service well only) __ NA_ _._ _ '~ ~ 17 _ Nonconven, gas conforms to AS31,05.030(j.1.A},(~.2.A-Dj _ _ _ __ No_ _ _ _ _ _ _ Engineering j18 Conducto[ st[ing provided _ Yes ____ _ _ ___ _---- --- -- Conductor set_in F-09 179-076 ,___ ~ 7 ~~19 Surface casing_protects all_known USDWs _____ _ - NA. _,_ Surface casin sgt in_ F-49. 9 , I,20 CMT_vol adequate_to circulate_on conductor & surf_csg ___ _ . NA_ _____ Surface casin set in_ F-09. _ 9 ,. . ~!21 CMT_vol. a~fequate_to tie-in long string lo surf csg_ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ _ Production casing sef in,F_-09; 22 CMT will cover_all known_productive honzon_s_ _ _ _ , _ Yes _ _ _ _ _ _ . . I23 Casing designs adequate for C,.T, 6 &. Rermafrost- - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - . I ~24 Adequate tankage_o_r re_serve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . _ . . . Fig is equipped with steelpits. _No.reserve_pitplanned._ All waste to approved di_sposzl_weli s . _ G~ ;25 If.a re-drill, has a_ 10-403 for abandon_ment been app_roved _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . . _ _ _ 307-046._ _ I26 Adequate wellbore separationproposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Directional_plan_pr~vided. _ Gyros_planned on_adjact_ed wells and during initi~l_kick-off work.. _ _ _ _ _ _ . _ _ _ _ . _ _ 27 Ifdive[terrequired,doesitmeetregulations_.___ _ __________ __ _____ ___NA___.._ _ BOPstack_Willalready_beinplace,__._________________________ ___ _________.. _ , Appr Date 28 Dril_ling fluid_ program schematic.& equip listadequate_ _ Yes ___ _ . Maximum expe~ted fo[mati4n pressure 6,9_EMW, Planned MW 8.4 - 8,5_ppg._ __ ___ ___ __ TEM 2/5l2007 ~29 BOPEs,dothe meetreulation Y 9 -.... Yes--_- -.-.- -----_- --------------------------------- --- -- ------ --- 6„~ ~{" ~ i30 ~31 BOPE press rat~ng appropriate; test to_(put psig ~n comments)_ ___ ___ Choke manifold complies w1API,RP-53 (M_ay 84) Yes _____ Yes __.__ _ MASP calculated at 2300psi, 3500_psi BOP test planned, . . 32 Work will occur without operation shutdown. , _ _ _ _ _ Yes _ _ , . _ . _ . _ 33 Is presen~e of H2S gas prqbable . . Yes __.__ __ H2S is know_n a~ Prudhoe Bay._ Mud_ ~hould p[eclude.on rig._ Rig ha~ sensQrs ~nd_ alarm5.. 34 - Mechanic~l cond~tion of wells within AOR verified ~For_s_ervice well only) _ _ _ _ _ - _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ . _ Geo~ogy , '35 Permitcan be issued wlo hydrogen_sulfide meas~ares _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _._-- - --- - --_ _ _ _ _ _ _ _ 36 Data_presented on_ pote_ntial overpressure zonzs _ _ NA. _ _ _ . _ . _ _ . . Appr Date 137 Seismic analysis of shallow gas_zones NA_ _____ __ ACS 1/30l2007 38 Seabed condition survey (if off_-shore) . NA_ ___ ',39 Contact namelphone far weekly_progress repods_ [exploratory only] _ , . . . _ _ _ Yes _ _ , _ _ _ Kris Honas 564,4338 . _ . _ _ _ _ _ _ Geologic Engineering Public Commissioner: Date: Commissioner: Date Co si ner Date ~~'~ ~ ~~ ~~ ~ ~ ~ ~J Well F-iistory File APPE~IDIX Information of detailed nature that is not i panicula~ly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to sim.plify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize ihis category of information. ~ ~ ~ F09g006182007s5N.txt Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Sep 14 09:04:31 2007 Reel Header Service name .............LISTPE Date . ...................07/09/14 Ori in ...................STS Ree~ Ndme. .... ........UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments .................5T5 LIS writing Library. Scientific Technical services Tape Header Service name .............LISTPE ~ate . ...................07/09/14 Origin ...................5T5 Tape Name. .... ........UNKNOWN continuation Number......01 Previous Tape Name.......UNKNOWN Comments .................5T5 LIS writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay unit MWD/MAD LOGS # WELL NAME: F-09B API NUMBER: 500292040302 OPERATOR: BP Exploration (Alaska) Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 13-SEP-07 # JOB DATA MWD RUN 1 MWD RUN 3 MWD RUN 4 ~OB NuMBER: w-0005043709 w-0005043709 W-0005043709 LOGGING ENGINEER: T. ONYEKWELU T. ONYEKWELU T. ONYEKWELU OPERATOR WITNESS: P. SMITH P. SMITH B. DECKER MWD RUN 6 MWD RUN 7 MAD RUN 7 706 NUMBER: w-0005043709 w-0005043709 W-0005043709 LOGGING ENGINEER: T. ONYEKWELU M. BUCKLEY M. BUCKLEY OPERATOR WITNESS: B. DECKER B. DECKER B. DECKER # SURFACE LOCATION SECTION: 2 TOWNSHIP: 11N RANGE: 13E FNL: 2467 FSL: FEL: Fw~: 2405 Page 1 ~~~--p-3 ~c~ , • ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: F096o06182007ssN.txt 64.99 32.60 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 9498.0 ~ l. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLE55 OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL EXITS THE F-09 WELLBORE BY MEANS OF A WHIPSTOCK, THE TOP OF WHICH w,45 ,4T 9498'MD/8463'TVD. 4. THE PURPOSE OF MWD RUN 1 WAS TO MILL TUBING AND CEMENT, AND TO ACQUIRE TIE- IN SGRC DATA. ONLY THESE SGRC DATA ARE PRESENTED. 5. MWD RUN 3 COMPRISED DIRECTIONAL, AND DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS. THE PURPOSE OF MWD RUN 3 WAS TO POSITION THE WHIP- STOCK, MILL THE WINDOW, AND DRILL A BIT OF RAT HOLE. SRAT AND SGRC DATA ARE PRESENTED FOR THIS RUN. 6. MWD RUNS 4,6,7 COMPRISED DIRECTIONAL, DGR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 4 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). MWD RUNS 6,7 ALSO INCLUDED AT-BIT INCLINATION (ABI), COMPENSATED THERMAL NEUTRON (CTN), AND AZIMUTHAL LITHO-DENSITY (ALD). MAD PASS DATA WERE ACQUIRED OVER THE INTERVAL 10312.5'MD-9561.5'MD(BIT DEPTHS) WHILE POOH AFTER REACHING FINAL TD. THE UPHOLE POROSITY DATA WERE MERGED WITH THE MWD RUN 6 DATA. THE DGR AND EWR4 DATA ARE INCLUDED AS A SEPARATE PRESENTATION. NO DATA WERE ACQUIRED DURING MWD RUNS 2& 5. 7. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN F-09A ON 2 JANUARY 2002. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVTDED BY D. DORTCH ON 7 AUGUST 2007, QUOTING AUTHORIZATION FROM ROGER SELS (BP). THE SHIFTED MWD DATA ARE CONSIDERED PDC FOR F-09B. 8. MWD RUNS 1,3,4,6,7 REPRESENT WELL F-096 WITH API#: Page 2 ~~ ~ F096o0618200755N.txt 50-029-20403-02. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12040'MD/9046'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT = SMOOTHED TOOL RUNNING SPEED WHEN NOT DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). TNPS = SMOOTHED THERMAL NEUTRON POROSITY (FIXED HOLE SIZE). CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. DENSLIDE = NON-ROTATED INTERVALS REFLECTING SENSOR-TO-BIT DISTANCE. AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. PARAMETERS UTILIZED FOR POROSITY LOG PROCESSING: HOLE SIZE: MUD WEIGHT: MUD SALINITY: FORMATION WATER SALINITY: FLUID DENSITY: MATRIX DENSITY: LITHOLOGY: $ File Header Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.000 Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR 1 6.0" BIT 8.4 - 8.7 PPG 9500 - 15000 PPM CHLORIDES 11500 PPM CNLORIDES 1.0 G/CC 2.65 G/CC SANDSTONE clipped curves; all bit runs merged. .5000 START DEPTH STOP DEPTH 9291.5 11975.5 Page 3 e ~ ~ F09go061820075SN.txt NCNT 9469.0 11947.0 FCNT 9469.0 11947.0 NPHI 9469.0 11947.0 RPM 9481.5 11982.5 RPx 9481.5 11982.5 FET 9481.5 11982.5 RPS 9481.5 11982.5 RPD 9481.5 11982.5 RHOB 9483.5 11962.5 DRHO 9483.5 11962.5 PEF 9483.5 11962.5 ROP 9489.5 12031.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPT H) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 9292.5 9293.0 9301.0 9301.5 9314.5 9316.0 9332.5 9333.0 9339.5 9340.0 9351.0 9351.0 9371.5 9374.0 9382.5 9384.5 9399.5 9402.5 9407.0 9410.0 9411.5 9415.0 9420.0 9426.5 9437.0 9446.0 9482.0 9490.5 9487.0 9496.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE Mw~ 1 9292.0 9430.5 Mw~ 3 9431.0 9525.0 Mw~ 4 9525.0 10069.0 Mw~ 6 10069.0 11193.0 Mw~ 7 11193.0 12040.5 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 ~epth units. . .. .. ..... Datum Specification Block sub-type...0 Name service Order units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CNTS 4 1 68 4 2 NCNT MWD CNTS 4 1 68 8 3 Page 4 ~ ~ F096o0618200755N.txt RHOB MWD G/CM 4 1 68 12 4 DRHO MWD G/CM 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HOUR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD BARN 4 1 68 44 12 ROP MWD FT/H 4 1 68 48 13 NPHI MWD PU-5 4 1 68 52 14 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 9291.5 12031.5 10661.5 5481 9291.5 12031.5 FCNT MWD CNTS 83.4 2000.94 559.033 4957 9469 11947 NCNT MWD CNTS 13050 39820 25848.5 4957 9469 11947 RHOB MwD G/CM 0.168 3.197 2.45932 4959 9483.5 11962.5 DRHO MWD G/CM -3.446 0.68 0.0467153 4959 9483.5 11962.5 RPD MwD OHMM 0.3 2000 60.9442 5003 9481.5 11982.5 RPM MwD OHMM 0.33 2000 48.9321 5003 9481.5 11982.5 RPS MwD OHMM 0.34 2000 37.0733 5003 9481.5 11982.5 rtPx Mw~ OHMM 0.31 2000 26.6747 5003 9481.5 11982.5 FET MwD HOUR 0.51 75.72 3.87485 5003 9481.5 11982.5 GR MwD API 13.87 570.2 68.04 5369 9291.5 11975.5 PEF MwD BARN 1.22 13.81 2.78058 4959 9483.5 11962.5 RoP Mw~ FT/H 0.73 287.71 48.1433 5085 9489.5 12031.5 NPHI MwD Pu-5 8.68 73.63 25.7521 4957 9469 11947 First Reading For Entire File..........9291.5 Last Reading For Entire File...........12031.5 File Trailer Service name... .......STSLIB.001 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name... .......STSLIB.002 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.....,.07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LIB.001 ~omment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD ~epth shifted and clipped curves; all MAD runs merged using earliest passes. Page 5 ~ ~ F096o06182007SSN.txt DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9495.5 10247.5 RPS 9502.5 10254.5 RPX 95Q2.5 10254.5 RPD 9502.5 10254.5 FET 9502.5 10254.5 RPM 9502.5 10254.5 RAT 9552.5 10303.5 $ # MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MwD 7 1 9504.5 12040.5 $ # REMARKS: MERGED MAD PASS. $ # Data Format Specification Record Ddtd Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined absent value ......................-999 Depth units. . .. .. ..... ~atum Specification Block sub-type...0 Name service order units Size ntsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MAD OHMM 4 1 68 4 2 RPM MAD OHMM 4 1 68 8 3 RPS MAD OHMM 4 1 68 12 4 RPX MAD OHMM 4 1 68 16 5 FET MAD HOUR 4 1 68 20 6 GR MAD API 4 1 68 24 7 w4T MAD FT/H 4 1 68 28 8 First Last Name Servi ce Unit Min Max Mean Nsam Reading Reading DEPT FT 9495.5 10303.5 9899.5 1617 9495.5 10303.5 RPD MAD OHMM 0.16 97.85 21.4488 1505 9502.5 10254.5 RPM MAD OHMM 0.16 71.06 16.9151 1505 9502.5 10254.5 rtPS MAD OHMM 0.19 49.25 13.633 1505 9502.5 10254.5 RPX MAD OHMM 0.24 34.54 11.1311 1505 9502.5 10254.5 FET MAD HOUR 104.17 212.32 151.171 1505 9502.5 10254.5 GR MAD aPZ 12.95 548.75 51.061 1505 9495.5 10247.5 RAT MAD FT/H 0.37 1669.34 314.908 1503 9552.5 10303.5 First Reading For Entire File..........9495.5 ~ast Reading For Entire File...........10303.5 File Trailer Service name .............STSLIB.002 Page 6 • ~ F096o0618200755N.txt Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.003 Physical EOF File Header Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical rtecord..65535 File Type. ............LO Previous File Name.......5T5LIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9292.0 9430.5 $ # LOG HEADER DATA DATE LOGGED: 08-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9498.0 TOP LOG INTERVAL (FT): 9480.0 BOTTOM LOG INTERVAL (FT): 9498.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: .O # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 130908 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Sea Water MUD DENSITY (LB/G): 8.40 MUD VISCOSITY (S): .O MUD PH: 9.0 MUD CHLORIDES (PPM): 6000 FLUID LO55 (C3): 11.1 Page 7 . . • ~ # # F09B00618200755N.txt RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE ~MT): .950 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .560 120.0 MUD FILTRATE AT MT: .800 68.0 MUD CAKE AT MT: .750 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... ..........0 ~ata Specification Block Type.....0 Log~ing Direction .................Down Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN ~ax frames per record .............undefined Absent value ......................-999 Depth units. . .. .. ..... ~atum specification Block sub-type...0 Name Service order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWDO10 API 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9292 9430.5 9361.25 278 9292 9430.5 GR Mw~010 aPI 33.19 91.43 57.0362 278 9292 9430.5 First Reading For Entire File..........9292 ~ast Reading For Entire File...........9430.5 File Trailer Service name... .......STSLIB.003 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 ~ate of ~eneration.......07/09/14 Page 8 . . ~ ~ F09B006182007SSN.txt Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9431.0 9460.0 RoP 9498.5 9525.0 S # LOG HEADER DATA DATE LOGGED: 09-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 72.13 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 9525.0 TOP LOG INTERVAL (FT): 9498.0 BOTTOM LOG INTERVAL (FT): 9525.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: .O MAXIMUM ANGLE: .O # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBE R DGR DUAL GAMMA RAY 153879 $ # BOREHOLE AND CASTNG DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Salt Water Gel MUD DENSITY (LB/G): 8.40 MUD VISCOSITY (5): 49.0 MUD PH: .O MUD CHLORIDES (PPM): 5400 FLUID LO55 (C3): 11.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .960 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .680 102.2 MUD FILTRATE AT MT: .820 70.0 MUD CAKE AT MT: .760 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: Page 9 ' • ~ F09BO06182007SSN.txt $ # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................DOwn Optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 ~epth units. . .. .. ..... ~atum specification Block sub-type...0 Name service Order units Size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 GR MWD030 API 4 1 68 4 2 ROP MWD030 FT/H 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9431 9525 9478 189 9431 9525 GR MWD030 API 55.58 80.45 74.4514 59 9431 9460 ROP MwD030 FT/H 2.54 97.57 22.1424 54 9498.5 9525 First Reading For Entire File..........9431 ~ast Reading For Entire File...........9525 File Trailer Service name... .......STSLIB.004 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.005 Physical EOF File Header Service name... .......STSLIB.005 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD ~urves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 # FILE SUMMARY Page 10 ~ ~ F09B0061820075SN.txt VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9460.5 10014.5 RPS 9490.0 10021.5 RPM 9490.0 10021.5 RPD 9490.0 10021.5 FET 9490.0 10021.5 RPx 9490.0 10021.5 ROP 9525.5 10069.0 $ # LOG HEADER DATA DATE LOGGED: 12-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 72.13 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10069.0 TOP LOG INTERVAL (FT): 9525.0 BOTTOM LOG INTERVAL (FT): 10069.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 20.6 MAXIMUM ANGLE: 45.5 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 160788 EWR4 Electromag Resis. 4 159436 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.50 MUD VISCOSITY (S): 54.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 6200 FLUID LOSS (C3): 9.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.500 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .870 122.0 MUD FILTRATE AT MT: .580 68.0 MUD CAKE AT MT: .400 68.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # Data Format Specification Record Data Record Type... ..........0 Data specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet Page 11 • • F09go0618200755N.txt ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 ~epth units. .. .. .. ..... Datum Specification Block sub-type...0 Name service order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD040 OHMM 4 1 68 4 2 RPM MWD040 OHMM 4 1 68 8 3 RPS MWD040 OHMM 4 1 68 12 4 RPX MWD040 OHMM 4 1 68 16 5 FET MWD040 HOUR 4 1 68 20 6 GR MWD040 API 4 1 68 24 7 ROP MWD040 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9460.5 10069 9764.75 1218 9460.5 10069 RPD Mw~040 OHMM 0.3 2000 73.6693 1064 9490 10021.5 RPM MwD040 OHMM 0.33 2000 81.3173 1064 9490 10021.5 RPS MwD040 OHMM 0.34 1658.4 25.4756 1064 9490 10021.5 RPx MwD040 OHMM 0.31 1543.09 16.269 1064 9490 10021.5 FET MwD040 HOUR 1.94 75.72 5.75814 1064 9490 10021.5 GR MWD040 API 13.87 570.2 53.329 1109 9460.5 10014.5 RoP Mw~040 FT/H 0.85 287.71 25.491 1088 9525.5 10069 First Reading For Entire File..........9460.5 ~ast Reading For Entire File...........10069 File Trailer Service name... .......STSLIB.005 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................~0 Next File Name...........5T5LIB.006 Physical EOF File Header Service name... .......STSLIB.006 Service Sub Level~Name... version Number. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......5T5LIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 Page 12 • ~ F09go06182007ssN.txt DE PTH INCREMENT: .5000 # FI LE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NPHI 9477.5 11110.0 FCNT 9477.5 11110.0 NCNT 9477.5 11110.0 PEF 9492.0 11125.5 RHOB 9492.0 11125.5 DRHO 9492.0 11125.5 GR 10015.0 11138.0 FET 10022.0 11145.5 RPx 10022.0 11145.5 RPS 10022.0 11145.5 RPM 10022.0 11145.5 RPD 10022.0 11145.5 ROP 10069.5 11193.0 $ # LOG HEADER DATA DATE LOGGED: 16-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 72.13 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 11193.0 TOP LOG INTERVAL (FT): 10069.0 BOTTOM LOG INTERVAL (FT): 11193.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 58.6 MAXIMUM ANGLE: 95.9 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 153883 CTN COMP THERMAL NEUTRON 231708 EWR4 Electromag rtesis. 4 159436 ALD Azimuthal Litho-Dens 179170 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRIL~ER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.60 MUD VISCOSITY (S): 48.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 12000 FLUID LO55 (C3): 8.9 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .290 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .150 143.6 MUD FILTRATE AT MT: .320 70.0 MUD CAKE AT MT: .450 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # Page 13 ~ i TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: F096o0618200755N.txt # Data Format Specification Record Data Record Type... ..........0 Data Specification alock Type.....0 Log~ing Direction .................DOwn opt~cal log depth units...........Feet ~ata rteference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. . .. .. ..... ~atum Specification Block sub-type...0 Name Service order Units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD060 CNTS 4 1 68 4 2 NCNT MWD060 CNTS 4 1 68 8 3 RHOB MWD060 G/CM 4 1 68 12 4 DRHO MWD060 G/CM 4 1 68 16 5 RPD MWD060 OHMM 4 1 68 20 6 RPM MWD060 OHMM 4 1 68 24 7 RPS MWD060 OHMM 4 1 68 28 8 RPX MWD060 OHMM 4 1 68 32 9 FET MWD060 HOUR 4 1 68 36 10 GR MWD060 API 4 1 68 40 11 PEF MWD060 BARN 4 1 68 44 12 ROP MWD060 FT/H 4 1 68 48 13 NPHI MWD060 PU-S 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9477.5 11193 10335.3 3432 9477.5 11193 FCNT MWD060 CNTS 83.4 2000.94 595.868 3266 9477.5 11110 NCNT Mw~060 CNTS 13050 39820 26133 3266 9477.5 11110 RHOB MwD060 G/CM 0.168 3.197 2.39505 3268 9492 11125.5 DRHO MWD060 G/CM -3.446 0.68 0.0436264 3268 9492 11125.5 RPD MwD060 OHMM 3.29 2000 93.8644 2248 10022 11145.5 RPM MWD060 OHMM 2.78 2000 63.7172 2248 10022 11145.5 RPS MWD060 OHMM 2.15 2000 64.1493 2248 10022 11145.5 RPx MwD060 OHMM 1.78 2000 45.9059 2248 10022 11145.5 FET MwD060 HOUR 1.26 35.99 3.97558 2248 10022 11145.5 Grt Mw~060 API 14.63 157.51 48.3898 2247 10015 11138 PEF MwD060 BARN 1.22 13.81 2.67632 3268 9492 11125.5 ROP Mw~060 FT/H 1.15 202.76 36.1161 2248 10069.5 11193 NPHI Mw~060 Pu-5 8.68 73.63 24.6256 3266 9477.5 11110 First rteading For Entire File..........9477.5 ~ast Reading For Entire File...........11193 File Trailer Service name... .......STSLIB.006 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Page 14 • • F09ao061820075sN.txt Maximum Physical rtecord..65535 File Ty e ................LO Next Fi~e Name...........STSLIB.007 Physical EOF Fi12 Header Service name... .......STSLIB.007 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH NCNT 11110.5 11956.0 NPHI 11110.5 11956.0 FCNT 11110.5 11956.0 DRHO 11126.0 11971.5 PEF 11126.0 11971.5 ~ RHOB 11126.0 11971.5 GR 11138.5 11984.5 RPS 11146.0 11991.5 RPD 11146.0 11991.5 FET 11146.0 11991.5 RPM 11146.0 11991.5 RPx 11146.0 11991.5 ROP 11193.5 12040.5 $ # LOG HEADER DATA DATE LOGGED: 18-JUN-07 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 12040.0 TOP LOG INTERVAL (FT): 11193.0 BOTTOM LOG INTERVAL (FT): 12040.0 BIT ROTATING SPEE D (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.9 MAXIMUM ANGLE: 90.6 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 87225 CTN COMP THERMAL NEUTRON 231708 EWR4 Electromag Resis. 4 130908 ALD Azimuthal Litho-Dens 179170 $ Page 15 • ~ ~ F096o0618200755N.txt # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (5): 45.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 9500 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .430 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .210 147.2 MUD FILTRATE AT MT: .350 70.0 MUD CAKE AT MT: .470 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: # Data Format Specification Record Data Record Type... ..........0 Data Specification Block Type.....0 Log~ing Direction .................Down optical log depth units...........Feet ~ata Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined Absent value ......................-999 Depth units. . .. .. ..... ~atum Specification slock sub-type...0 Name service Order units Size -vsam Rep Code offset Channel DEPT FT 4 1 68 0 1 FCNT MWD070 CNTS 4 1 68 4 2 NCNT MWD070 CNTS 4 1 68 8 3 RHOB MWD070 G/CM 4 1 68 12 4 DRHO MWD070 G/CM 4 1 68 16 5 RPD MWD070 OHMM 4 1 68 20 6 RPM MWD070 OHMM 4 1 68 24 7 RPS MWD070 OHMM 4 1 68 28 8 RPX MWD070 OHMM 4 1 68 32 9 FET MWD070 HOUR 4 1 68 36 10 GR MWD070 API 4 1 68 40 11 PEF MWD070 BARN 4 1 68 44 12 ROP MWD070 FT/H 4 1 68 48 13 NPHI MWD070 PU-5 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11110.5 12040.5 11575.5 1861 11110.5 12040.5 FCNT MWD070 CNTS 302.39 878.61 487.782 1692 11110.5 11956 Page 16 • ~ F096o06182007ssN.txt NCNT MWD070 CNTS 20536.2 32126.9 25294.8 1692 11110.5 11956 RHOB MwD070 G/CM 2.147 2.839 2.58318 1692 11126 11971.5 DRHO MWD070 G/CM -0.058 0.203 0.0522305 1692 11126 11971.5 RPD Mw~070 OHMM 5.16 20.49 9.4987 1692 11146 11991.5 RPM MWD070 OHMM 4.5 17.09 8.93814 1692 11146 11991.5 RPS Mw~070 OHMM 4.41 15.98 8.37153 1692 11146 11991.5 RPx MWD070 OHMM 4.24 14.45 7.65206 1692 11146 11991.5 FET MwD070 HOUR 0.51 26.27 2.59879 1692 11146 11991.5 GR Mw~070 API 19.98 192.63 105.383 1693 11138.5 11984.5 PEF MWD070 BARN 1.41 4.48 2.98709 1692 11126 11971.5 RoP MwD070 FT/H 0.73 272.92 79.4631 1695 11193.5 12040.5 NPHI Mw~070 Pu-5 18.92 35.62 27.9292 1692 11110.5 11956 First Reading For Entire File..........11110.5 ~ast Reading For Entire File...........12040.5 File Trailer Service name... .......STSLIB.007 Service Sub Level Name... version Number. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.008 Physical EOF File Header Service name... .......STSLIB.008 Service Sub Level Name... version Number. ........1.0.0 Date of Generation.......07/09/14 Maximum Physical Record..65535 File Type. ............LO Previous File Name.......STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MAD Curves and log header data DEPTH INCREMENT: .5000 MAD RUN NUMBER: 7 MAD PASS NUMBER: 1 # FILE SUMMARY for each pass of each run in separate files. VENDOR TOOL CODE START DEPTH GR 9504.5 RPM 9511.5 RPS 9511.5 RPx 9511.5 FET 9511.5 RPD 9511.5 RAT 9561.5 $ # LOG HEADER DATA DATE LOGGED: SOFTWARE STOP DEPTH 10256.5 10263.5 10263.5 10263.5 10263.5 10263.5 10312.5 18-JUN-07 Page 17 ~ • • F096o06182007s5N.txt SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 74.11 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 10312.5 TOP LOG INTERVAL (FT): 9561.5 BOTfOM LOG INTERVAL (FT): 10312.5 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 85.9 MAXIMUM ANGLE: 90.6 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 87225 EWR4 Electromag Resis. 4 130908 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 9498.0 # BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G): 8.70 MUD VISCOSITY (S): 45.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 9500 FLUID LOSS (C3): 5.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .430 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .210 147.2 MUD FILTRATE AT MT: .350 70.0 MUD CAKE AT MT: .470 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type... ..........0 ~ata specification Block Type.....0 Log~ing Direction .................DOwn optical log depth units...........Feet Data Reference Point ..............undefined Frame Spacing....... ............60 .lIN Max frames per record .............undefined ,4bsent value ......................-999 aepth Units. . .. .. ..... Datum Specification Block sub-type...0 Name service Order Units Size Nsam Rep ~ode offset Channel DEPT FT 4 1 68 0 1 RPD MAD071 OHMM 4 1 68 4 2 RPM MAD071 OHMM 4 1 68 8 3 RPS MAD071 OHMM 4 1 68 12 4 RPX MAD071 OHMM 4 1 68 16 5 Page 18 ' ~ • F096o0618200755N.txt FET MAD071 HOUR 4 1 68 20 6 GR MAD071 API 4 1 68 24 7 rzAT MAD071 FT/H 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9504.5 10312.5 9908.5 1617 9504.5 10312.5 RPD MAD071 OHMM 0.16 97.85 21.4488 1505 9511.5 10263.5 RPM MAD071 OHMM 0.16 71.06 16.9151 1505 9511.5 10263.5 RPS MAD071 OHMM 0.19 49.25 13.633 1505 9511.5 10263.5 RPX MAD071 OHMM 0.24 34.54 11.1311 1505 9511.5 10263.5 FET MAD071 HOUR 104.17 212.32 151.171 1505 9511.5 10263.5 GR MAD071 API 12.95 548.75 51.061 1505 9504.5 10256.5 RAT MA~071 FT/H 0.37 1669.34 314.908 1503 9561.5 10312.5 First Reading For Entire File..........9504.5 ~ast Reading For Entire File...........10312.5 File Trailer Service name... .......STSLIB.008 Service Sub Level Name... version -vumber. ........1.0.0 ~ate of Generation.......07/09/14 Maximum Physical Record..65535 File Type ................LO Next File Name...........STSLIB.009 Physical EOF Tape Trailer Service name .............LISTPE ~ate . ...................07/09/14 origin ...................STS Tape Name. .... ........UNKNOWN Continuation Number......01 Next Tape Name...........UNKNOWN Comments .................STS LIS Writing Library. Reel Trailer Service name .............LISTPE Date . ...................07/09/14 Ori in ...................5T5 Ree~ Name. .... ........UNKNOWN Continuation Number......01 Next Reel Name...........UNKNOWN Comments .................5T5 LIS Writing Library Physical EOF Physical EOF Scientific Technical Services scientific Technical services Page 19 End Of LIS File ~ F09g00618200755tv.txt Page 20 •