Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-056 STATE OF ALASKA RECEIVED LASKA OIL AND GAS CONSERVATION COMMI WELLWMPLETION OR RECOMPLETION REPO AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned El • Suspended 0 1b.Well CIA 4• 0 ? 2O�Q 20AAC 25.105 20AAC 25.110 Development El ExploratorylUU 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service likkirairpirn00 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Perm t DtyR) b ry BP Exploration(Alaska),Inc 12/2/2017 • 208-056 ' 317-374 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 6/25/2008 50-029-23388-62-00' 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 6/26/2008 PBU L-205L4 ' Surface: 2361'FSL,3786'EEL,Sec.34,T12N,R11E,UM • 9 Ref Elevations KB 76.10 17. Field/Pool(s): 1815'FSL,351'FEL,Sec.33,T12N,R11E,UM GL 47.60 • BF 48.83 PS�UDHOE SAY,ORIQ9 L 64/, Top of Productive Interval: t r r' c Total Depth: 1971'FNL,4969'FEL,Sec.03,T11N,R11E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 6. . ,/ f • 2925'/2655' • ADL 028239&028241 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. DNR Approval Number: Surface:x- 583130 • y- 5978082 . Zone - ASP 4 • 8763'/4269' • 00-001 TPI: x- 581293 y- 5977515 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 582004 y- 5973737 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No Il 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Wndow MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) • 4841'/4205' • 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES/AZI Density/NEU/AIM/PWD 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 129# x-56 29' 153' 29' 153' Driven 10-3/4" 45.5# L-80 29' 3026' 29' 2739' 13-1/2" 684 DeepCrete,402 sx Class'G' 7/5/8" 29.7# L-80 3004' 4841' 2720' 4205' 9-7/8" 413 sx Class'G' 2977' 4-1/2" 12.6# 13Cr85/L-80 3662' 8752' 3284' 4269' 6-3/4" 165 sx Class'G',Uncemented Slotted Liner • 24. Open to production or injection? Yes 0 No Q 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 3540'-3669' 3561'/3197' A-60.1.10 01.1026. ACID,FRACTURE,CEMENT SQUEEZE,ETC. JAN Was hydraulic fracturing used during completion? • SUMMED H N 2 2 4.'018 Per 20 AAC 25.283(i)(2)attach electronic and printed Yes ❑ No Q SUMMED1240'1' 2�Z I t� information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 1,,,- See Attached 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size Gas-Oil Ratio: Test Period ••••f] Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate ••••► Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only V'TL I/1 -1 14 l 28. CORE DATA . Conventional Core(s) Yes 0 No 1 • Sidewall Cores Yes 0 No I If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No 0 Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 4868' 421 g separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Schrader Bluff OA 4868' 4219' Schrader Bluff OBa 5075' 4286' Schrader Bluff OA(Invert) 5186' 4287' Formation at total depth: Schrader Bluff OA(From Base) 4287' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka,Joseph N Contact Name: Thompson,Jacob Authorized Title: Info 'on and Data nt Iler / Contact Email: Jacob.Thompson@BP.com 1IVV// ��` Authorized Signature: Gate:tl/ 2.1 1 1I Contact Phone: +1 907 564 5579 INS/TRU_CTIIO1NS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and ND for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • • 1/8/18 Per Joe Lastufka, the TPI location data for well L-205 and all of it's laterals(1-5)were incorrectly identified (by another person) on the 10-407's for completion.The TPI location data submitted with the 10-407's for abandonment are correct and have been entered into RBDMS. Liz Link S WELL NAME: L-205L4 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 4585' Set CIBP 4558' 17.2 Gal Cement 3540' Cut& Pull Tubing 3004' Cut& Pull 7-5/8" Casing 2953' Set CIBP 2925' Set Whipstock • Daily Report of Well Operations L-205L4 ACTIVITYDATE SUMMARY T/I/0=1050/940/100, Temp=SI. PPPOT-T (PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test port(100 psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Torqued to 400 lb/ft. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(0+ psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Torqued to 400 lb/ft. Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 100 psi in 15 min, lost 50 9/20/2017 psi in second 15 min (PASS). Bled void to 0 psi. ***WELL SHUT IN ON ARRIVAL*** (Sidetrack) DRIFT W/20' x 3.70" DMY WHIPSTOCK&2.00" S. BAILER, STOP PER PROGRAM @ 4600' SLM 10/15/2017 ***CONT. ON 10/16/17 WSR*** ***CONT. FROM 10/15/17 WSR*** (Sidetrack) SET 4-1/2"X-CATCHER IN X-NIPPLE @ 3486' MD PULL BK-OGLV FROM ST#1 @ 3338' MD PULL EMPTY X-CATCHER FROM X-NIPPLE @ 3486' MD ***WELL LEFT SHUT IN, PAD-OP NOTIFIED*** 10/16/2017 ****ST#1 GLM HAS AN OPEN POCKET FOR FUTURE PUMPING OPERATIONS**** T/I/0=1000/1000/100 Temp=S/I (LRS Unit 70 -Assist E-line: Load Well Pre CIBP/Cement Dump) Pumped 10 bbls meth followed by 282 bbls 1%KCL down TBG for load and kill. Pumped 3bbls meth folowed by 43 bbls DSL down TBG for FP. FP tag and caution tag hung on WV. E-Line in control of well upon departure. CV's OTG 10/22/2017 FWHP= 700/1200/600 ***JOB STARTED ON 22-OCTOBER-2017***(SLB ELINE SET CIBP/CEMENT BAILER) WELL SHUT IN ON ARRIVAL. RUN 1: RIH W/ BAKER 10 SETTING TOOL/4.5"WFD CIBP. SET MID ELEMENT CIBP AT 4586, CCL TO MID ELEMENT = 7', CCL STOP DEPTH = 4579'. TOP OF CIBP ©4585. S/D AND TAGGED PLUG. RUN 2: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT ON TOP OF PLUG. TOP CEMENT LEVEL=4578'. LOG CORRELATED TO 4.5" SCAB LINER TALLY DATED 09-NOVEMBER-2011 10/22/2017 ***JOB CONTINUED ON 23-OCTOBER-2017*** ***JOB CONTINUED FROM 22-OCTOBER-2017*** (SLB ELINE CEMENT BAILER) WELL OPEN FROM CONTINUATION OF PREVIOUS DAY OPERATTIONS. RUN 3: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CUMULATIVE CEMENT= 13.6'. TOP OF CEMENT= 4571.4'. RUN 4: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CUMULATIVE CEMENT= 20.4'. TOP OF CEMENT=4564.6'. RUN 5: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CEMENT LEVEL=4558'. POOH. TOTAL CEMENT DUMPED 17.2 GALLONS. LOG CORRELATED TO 4.5" SCAB LINER TALLY DATED 09-NOVEMBER-2011. RDMO. WELL SHUT IN ON DEPARTURE. NOTIFY PAD OP AND HAND OVER RAP ON DEPARTURE. 10/23/2017 ***JOB COMPLETED ON 23-OCTOBER-2017*** • Daily Report of Well Operations L-205L4 T/I/O=134/980/vac Temp= S/I (LRS unit 70-Circ Out/Sidetrack) Pre-heat 260 bbls diesel tanker to 50*. Unload well down L-114 flow line. Pumping down TBG up IA through choke trailer down hard line. Spear in with 5 bbls of 60/40 followed by 278 bbls of 130* H2O followed by 150 bbls of 50*diesel. F-protected F-line L-114 with 10 bbls of 60/40, shut Inlet &choke & psi up to 500 psi with .1 bbl of 60/40. CMIT TxIA FAILED @ T/IA 2051/2064 psi (Max Applied psi 2200 Target psi 2000 psi) 1st test: 1st 15 min TP lost 135 &the IA lost 132 psi. RE-psi with a bump. 2nd test: 1st 15 min TP lost 90 psi & IA lost 90 psi; 2nd 15 min TP lost 72 psi IAP lost 72 psi for a total of 162/162 psi in 30 min. RE-psi with a bump. 3rd test: 1st 15 min TP lost 75 psi IAP lost 76 psi 2nd 15 min TP lost 58 psi IAP lost 60 psi for a total of 133/136 psi in 30 min. Bleed well head psi down & rig down for hardline crew to rig hardline down and let well stabilize. LRS or DHD will return to re-perform CMIT. Hardline crew on well on dep. Wing shut, swab 10/26/2017 shut; ssv and master open IA shut OA open AFE&Tags hung. Final Whp's=393/404/vac ***WELL SHUT IN ON ARRIVAL***(side track) RAN 3.70" CENT, 2 1/2" SAMPLE BAILER TO 4,538' SLM (no sample) TAGGED TOP OF CEMENT W/2" CENT, 1 1/2" SAMPLE BAILER @ 4,543' SLM 10/27/2017 ***WELL LEFT S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** T/I/O = 340/310/Vac. Temp = SI. CMIT TxIA PASSED to 2130/2121 psi, target 2000 psi max 2200 psi. ALP = 1500 psi, SI @ CV. T FL @ 90' 1.3 bbls, IA FL @ surface. Grease crew serviced WV and IA AL valve. Bled TP from 340 psi to 50 psi all gas, shut in when fluid to surface. Used 2 bbls of diesel to pressure TxIA to 2210/2200 psi. 1st test lost 62/61 psi, 2nd test lost 18/18 psi, 80/79 psi total in 30 min. Bled TP to 200 psi returned 2 bbls. Tags hung. Final WHPs = 200/200/vac. 10/28/2017 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 14:00 T/I/O = SSV/250/0 TEMP = SI, PPPOT-T (PASS) PPPOT-IC (PASS) Pre Rig PPPOT-T: Stung into test void, 0 psi on void. Monitored for 10 min, no change in pressure. Function all LDS, all moved freely. torque all LDS to 450 ft/lbs. Pump though void, good returns. Pressure void to 5,000 psi for 30 min test. Lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi R/D test equipment PPPOT-IC: Stung into test void, 0 psi on void. Monitored for 10 min, no change in pressure. Function all LDS, all moved freely. Torque all LDSto 450 ft/lbs. Unable to pump through void. Pressure void to 3,500 psi, for 30 min test. Lost 50 psi in 15, lost 0 psi in second 15 10/30/2017 min (PASS). Bled void to 0 psi. ***WELL S/I ON ARRIVAL*** (SLB ELINE TBG JET CUT) INITIAL T/I/O =270/250/0. MIRU, LPT/HPT = PASS. RUN 1: RIH W/ HEAD(FN 1-3/8")/CCL/WB(X2)/WPSA/SHOCK SUB(X3)/4-1/2" JET CUTTER. OAL= 22.4'. OAW= 203 LBS. MAX O.D. = 3.65". SHOOT JET CUTTER AT 3540'. GOOD INDICATION OF SHOT. CCL TO TOP SHOT 20.7'. CCL STOP DEPTH = 3519.3'. POOH, RDMO. FINAL T/l/O =40/50/0 10/31/2017 ***JOB COMPLETE ON 31-OCTOBER-2017. WELL LEFT S/I ON DEPARTURE*** T/I/O= 77/80Nac Temp= S/I (SIDE TRACK) Pumped 2.4 bbls diesel down IA to 1810 psi, 11/1/2017 Monitor pressure to stabilize, ***WSR Continue on 11-02-17*** • • Daily Report of Well Operations L-205L4 **"WSR Continued from 11-01-17*** CMIT-TxIA PASSED @ 2137/2138 psi, Max Applied Pressure= 2200 psi, Target Pressure= 2000 psi, (SIDE TRACK) CMIT-TxIA= Pumped .5 bbls (total of 3 bbls) diesel down IA to reach test pressure, T/IA lost 35/34 psi in 1st 15 min and 15/14 psi in 2nd 15 min fora total loss of 50/48 psi in 30 min test, Bleed T/IA pressure, Bled back — 3 bbls, OA Integrity Test= Pumped 2.4 bbls crude down OA to reach 1195 psi, Monitor pressure for 5 min, Pressure dropped to 1150 psi, No returns to surface, Bleed OAP, Bled back- 1.3 bbls, AFE sign &tags hung on well, Valve position @ 11/2/2017 departure-WV, SV, SSV, AL= Closed MV= Open IA& OA= OTG, FWHP= 22/26/0 T/I/0=100/1100/400 Set 4" CIW"H" BPV#152 Pre-Parker 272. FWP's BPV/1100/400 see 11/5/2017 log for details. T/I/BPV/0/0 R/D production tree to 4" Dryhole tree, Temp#97. Piggybacked IA& OA 11/8/2017 valves, Temp#08 &#95. FWP's BPV/0/0/ see log for details. T/I/O = BPV/0/0. Temp = SI. Bleed IA& OA to 0 psi. (Pre-Rig). IA& OA @ gauge 0, no bleed required. Well house, flow line production riser, SSV, scaffold removed. IA& OA have 2 double casing valves installed @ the 9 O'clock position. OA FL @ Surface . 11/13/2017 SV, WV= C. MV= O. IA, OA= OTG. 23:00 T/I/O = BPV/0/10. Temp = SI. WHPs (pre RIG). Scaffold &flowline removed. Rig well house installed on well. 11/26/2017 SV= C. WV, MV, SSV= 0. IA, OA= OTG. 12:00 S • North America-ALASKA-BP Page 1 VW- Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: 1X3-018F8-C:(2,979,366 00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL C/94.43usft(above Mean Sea Level) Date From-To Mrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 11/27/2017 12:00 - 19:00 7.00 RIGD P PRE I GENERAL RIG DOWN OPERATIONS I -CONTINUE TO BLOW DOWN AND RIG DOWN LINES 1-DISCONNECT INNER CONNECTS -SKID RIG FLOOR -LAY OVER DERRICK -SEPARATE MODULES AND STAGE IN PREPARATION FOR MOVE HELD PJSM WITH RIG CREW,TOOL SERVICE AND SECURITY TO DISCUSS RIG MOVE. 19:00 - 00:00 5.00 RIGU P PRE I MOVE RIG MODULES FROM S-PAD TOWARDS L-PAD -ON SPINE ROAD FROM 21:00 TO 00:00 11/28/2017 00:00 - 03:30 3.50 RIGU P PRE CONTINUE TO MOVE RIG TO L-PAD ALONG L AND V-PAD ACCESS ROAD 03:30 - 05:00 1.50 RIGU P PRE STAGE DRILL MOD ON TOP OF TRANSISTION MATS.REMOVE ANNULAR DIVERTER AND PICK UP 7-5/8 RAMS AND TREE TO BOP DECK. 05:00 - 07:00 2.00 RIGU - P PRE SPOT DRILL MOD OVER L-205A.MATE UTILITY [FOOD AND MUD MOD TO DRILL MOD. 07:00 - 08:00 1.00 RIGU P PRE -HOOKUP INTERCONNECTS AND RIG UP MODS 08:00 - 08:30 0.50 RIGU P F PRE RAISE DERRICK WITH 525 KLBS OFF THE RACK 08:30 - 09:00 0.50 RIGU P f PRE SKID RIG FLOOR.RAISE PIPE CAT.SKID HAUNCH. 09:00 - 16:00 7.00 RIGU P PRE GENERAL RIG-UP OPERATIONS: -RIG-UP RIG FLOOR,BRIDLE DOWN BLOCKS -PERFORM API DERRICK INSPECTION -HOOK UP MUD MOD INTERCONNECT -INSTALL OFFLINE MOUSEHOLES -BRING NOV WIRED DRILL PIPE CONTROL PANEL TO LER -HANG RIG TONGS -PRESSURE TEST MUD LINE TO 3500 PSI 16:00 - 17:00 1.00 RIGU P PRE PRESSURE TEST BPV FROM BELOW TO 2000 PSI FOR 5 MIN(PASS) -SEE ATTACHED TEST CHART -REVIEW PRESSURE CROSSCHECK PRIOR TO TEST PERFORM RIG WALKAROUNDANDACCEPT _. RIG AT 16:00 HRS 17:00 - 18:30 1.50 RIGU P i PRE NIPPLE DOWN TREE AND ADAPTER FLANGE PER FMC REP -FUNCTION AND INSPECT LOCK DOWN SCREWS AND GLAND NUTS _-CLEAN AND INSPECT HANGER THREADS 18:30 - 19:30 1.00 RIGU N PRE INSTALL BLANKING PLUG ASSEMBLY -DUE TO POSITION OF HEAT TRACE LINE ON TUBING HANGER,4-1/2 IF(BOX)X 4-1/2"TCII (PIN)CROSSOVER WOULD NOT FIT.INSTALL LOWER CROSSOVER 3-1/2 IF(BOX)X 4-1/2" 'TCII AND UPPER CROSSOVER 4-1/2 IF(BOX) X 3-1/2 IF(PIN). Printed 12/11/2017 3.52.48PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 2b" Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To 1 Hrs Task 1 Code NPT Total Depth Phase Description of Operations (hr) (usft) 19:30 - 23:00 3.50 RIGU P PRE NIPPLE UP BOPE AND HIGH PRESSURE •RISER LOWER RISER SPOOLS AND BOPE -TORQUE BOLTS TO SPEC '-OBTAIN RKB MEASUREMENTS INSTALL TURNBUCKLES AND FLOW RISER 23:00 - 00:00 1.00 • RIGU C STRUCT BEGIN TOP DRIVE MODIFICATION FOR WIRED DRILL PIPE: 1 I SIMOPS: -CHANGE UPPER RAMS TO 7-5/8"FIXED -PREVENTATIVE MAINTENANCE ON BOP: 1 I OPEN AND INSPECT ALL RAM CAVITIES PERFORM QUADCO PRE-SPUD INSPECTION PRIOR TO TAKING ON FLUID TEST CHOKE MANIFOLD OFFLINE 11/29/2017 00:00 - 09:00 9.00 RIGU C STRUCT I CONTINUE TOP DRIVE MODIFICATION FOR WIRED DRILL PIPE FINISH DRILLING HOLES IN TORQUE ARRESTER FOR ZONAL MANAGEMENT I jSENSOR -INSTALL TORQUE ARRESTER ONTO THE . RLA i:-INSTALL PRE-MADE UP UPPER IBOP/ LOWER IBOP/DATA SAVER/SAVER SUB ' ASSEMBLY FUNCTION TEST AND INSPECT TOP DRIVE SIMOPS: -HOLD RIG EVACUATION DRILL W/AAR -HOLD PRE-SPUD MEETING WITH 1 HUNDLEY'S CREW -CHANGE UPPER RAMS TO 7-5/8"FIXED -PREVENTATIVE MAINTENANCE ON BOP: 1 10PEN AND INSPECT ALL RAM CAVITIES I 1-PRESSURE TEST THE CHOKE MANIFOLD i VALVES OFF-LINE,250/3500 PSI FOR 5 CHARTED MIN EACH 09:00 - 11:00 2.00 1 BOPSUR P PRE RIG UP TO TEST BOPE. ' -FILL SYSTEM WITH WATER AND PURGE AIR. ' -PERFORM A SHELL TEST TO 3500 PSI FOR 5 MIN;GOOD TEST. 1-RE-TORQUE ALL BOLTS ON FLANGES AND BOP RAM DOORS 11:00 - 16 00 ; 5.00 BOPSUR I P PRE 1 TEST BOPE TO 250 PSI LOW,3500 PSI HIGH j FOR 5 CHARTED MINUTES EACH PER BP AND AOGCC REQUIREMENTS -TEST WITH 4",5"AND 7-5/8"TEST JOINTS TEST ALARMS,PVT AND FLOW SHOW -TEST RAM LOCKS,HIGH/LOW BYPASS 1 FUNCTION AND POWER BLACK-OUT -ALL TESTS PASS,SEE ATTACHED TEST CHARTS 1-TEST WITNESS WAIVED BY AOGCC REP _ 1 ADAM EARL 16:00 - 17:00 1.00 BOPSUR P i PRE 1 PICKUP,INSTALL DUTCH RISER AND RUN IN LOCK DOWNS I-CLOSE ANNULAR PREVENTER ON DUTCH RISER 1 -PICK UP LUBRICATOR AND EXTENSIONS Printed 12/11/2017 3:52:48PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 30 Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:11/27/2017 1 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay 'Site:P8 L Pad Rig Name/No.:PARKER 272 Spud DateTme:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA0000I709 Active datum:L-205A ACTUAL©94.43usft(above Mean Sea Level) Date From-To Hrs Task Code j NPT Total Depth Phase I Description of Operations (hr) (usft) 17:00 - 18:00 1.00 ' WHSUR P ' PRE PULL BLANKING SUB AND BPV -PRESSURE DUTCH RISER,LUBRICATOR ,AND QUICK-TEST SUB;GOOD TEST STAND BACK LUBRICATOR 1-PULL BLANKING PLUG THROUGH DUTCH RISER -MAKE UP LUBRICATOR AND TEST QUICK 'TEST SUB -PULL BPV AND LAY DOWN 18:00 - 19:00 1.00 BOPSUR P DECOMP RIG DOWN LUBRICATOR AND DUTCH RISER 19:00 - 21:00 2.00 WHSUR P 3,450.00 DECOMP CIRCULATE BARAKLEAN SOAP PILL SURFACE TO SURFACE DOWN THE TUBING,TAKING RETURNS TO THE FLOW BACK TANK -7 BPM,800 PSI AT THE PUMP WITH 140 PSI 'ON THE CHOKE OUT TO THE FLOW BACK TANK 1-PUMPED 250 BBLS TOTAL SIMOPS: _ ' CHANGE OUT WASH PIPE ON TOP DRIVE 21:00 - 23:00 I 2.00 WHSUR - P ' I 3,450.00 DECOMP RIG UP TO PULL 4-1/2"TUBING WITH I-WIRE i AND HEAT TRACE _,MAKE UP LANDING JOINT WITH XO AND -ENGAGE TUBING HANGER -RIG UP DOYON CASING TONGS '-RIG UP SLB SPOOLING UNITS(x2)WITH SHEAVES FOR I-WIRE AND HEAT TRACE 23:00 - 00:00 1.00 WHSUR- P 3,450.00 DECOMP ATTEMPT TO PULL4-1/2"TUBING HANGER TO RIG FLOOR -BACK OUT LOCK DOWN SCREWS 1 -HANGER PULLED OFF SEAT WITH 75 KLBS (ESTIMATED BUOYED WT OF STRING+ BLOCKS AND TOP DRIVE=74 KLBS) -PULLED UP TO 160 KLBS IN 10 KLB j I INCREMENTS,36"OF STRETCH WITH 85 I KLBS OVERPULL I -FLEX STRING UP TO 150 KLBS AND CALL I ODE AND WSUP. 11/30/2017 00:00 - 02:30 2.50 WHSUR P j 3,450.00 DECOMP CONTINUE TO WORK 4-1/2"TUBING HANGER TO RIG FLOOR -FLEX STRING UP TO 150 KLBS-100 TIMES -STRING PULLED FREE WITH 140 KLBS -AFTER 20'WEIGHT FELL OFF TO 85 KLBS • I -PULL HANGER TO FLOOR RIG FLOOR 02:30 - 03:30 1.00 WHSUR I P 1 3,450.00 DECOMP CIRCULATE WELL CLEAN WITH A BARAKLEAN SOAP PILL -12 BPM,580 PSI -SIGNIFICANT VOLUME OF HEAVY SAND BACK ' -FLOW CHECK WELL FOR 10 MIN;STATIC 03:30 - 04:30 1.00 WHSUR P 3,450.00 DECOMP RIG UP TO LAY DOWN 4-1/2"TUBING WITH I-WIRE AND HEAT TRACE -TERMINATE I-WIRE -RIG UP SPOOLING UNITS ,-LAY DOWN TUBING HANGER AND LANDING JOINT Printed 12/11/2017 3:52:48PM *All depths reported in Drillers Depths" • North America-ALASKA-BP • Page 4 Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) 1 Project:Prudhoe Bay I Site:PB L Pad Rig Name/No.:PARKER 272 , Spud DateTme:4/27/2008 12:00:00AM 'Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date 1 From-To j Hrs Task i Code j NPT Total Depth Phase Description of Operations (hr) ± (usft) 1 04:30 - 15:00 10.50 CASING I P 3,450.00 DECOMP I PULL AND LAY DOWN 4-1/2"TUBING WITH Ii 11-WIRE AND HEAT TRACE FROM CUT AT 3450' I MD TO SURFACE -PU 85 KLBS,SO 75 KLBS AT 3400'MD 1-MONITOR HOLE FILL WITH TRIP TANK; GOOD FILL 1-RECOVER:(77 EA)FULL JTS,(3 EA)GLM 'ASSEMBLIES,(2 EA)X-NIPPLE ASSEMBLIES, (1 EA)GAUGE CARRIER ASSEMBLY,(1 EA) GAUGE ASSEMBLY,(1 EA)SLIDING SLEEVE 1 ASSEMBLY,(3 EA)SPACE-OUT PUPS,(1 EA) TUBING HANGER AND PUP ASSEMBLY,(1 EA) I CUT JOINT,-38.35'OAL WITH 4.75"OD FLARE, (493 EA)5'CLAMPS,(91 EA)2'CLAMPS,(7 EA) 4 SS BANDS,-3400'HEAT TRACE,-3410'I-WIRE 1-CLEAN E-LINE JET CUT,SEE ATTACHED PHOTOS 1 15:00 - 16:30 1.50 CASING P 3,450.00 DECOMP I RIG DOWN SLB SPOOLERS AND DOYON 1 CASING TONGS.- CLEAN AND CLEAR RIG FLOOR. 16:30 - 17:00 0.50 CASING P 3,450.00 1 DECOMP I INSTALL 7-1/8"ID WEAR RING 17:00 - 17:30 0.50 FISH P 3,450.00 I DECOMP F PICKUP AND MAKE UP SLB HYDRAULIC _CASING CUTTER ASSEMBLY,DRESSED TO 1 CUT 7-5/8"CASING,PER SLB FISHING 'REPRESENTATIVE 17:30 - 20:30 3.00 FISH P 3,450.00 DECOMP RUN IN THE HOLE WITH SLB CASING CUTTER 1 ASSEMBLY TO 3004'MD,PICKING UP 4"DRILL I 1 PIPE SINGLES FROM THE PIPE SHED -MW IN/OUT=9.2 PPG -PU 75 KLBS,SO 71 KLBS AT 3004'MD 120:30 22:00 1.50 FISH P 3,450.00 DECOMP I ESTABLISH PARAMETERS AND CUT 7-5/8" 1 CASING AT 3004'MD -45 RPM,3-7 KFT-LBS TORQUE,160 GPM,850 i PSI 1 ; -GOOD INDICATION OF CUT WITH OA PRESSURE INCREASE TO 310 PSI I -ROTATE FOR AN ADDITIONAL 15 MIN AFTER OBSERVED OA PRESSURE INCREASE 22:00 - 23:30 1.50 FISH P 3,450.00 DECOMP CIRCULATE OUT OA FREEZE PROTECT TO . FLOW BACK TANK -CLOSE ANNULAR PREVENTER AND LINE UP TO FLOW BACK TANK -ESTABLISH CIRCULATION AND SPOT A BARAKLEAN SOAP PILL IN THE OA -LET SOAP PILL SOAK FOR 15 MIN -CIRCULATE OUT SOAP PILL AND OA FLUIDS TO THE FLOW BACK TANK 1 4.5 BPM,1450 PSI WITH 65 PSI ON THE I CHOKE OUT TO THE FLOW BACK TANK 1-SPOT A SECOND BARAKLEAN SOAP PILL ON THE BACK SIDE OF THE 7-5/8"CASING -MONITOR THE WELL FOR 10 MIN;STATIC 23:30 - 00:00 0.50 FISH P 3,450.00 DECOMP PULL OUT OF THE HOLE WITH THE SLB CASING CUTTER ASSEMBLY FROM 3004'MD TO 2380'MD , -PU 75 KLBS,SO 71 KLBS AT 3000'MD -10K OVERPULL REQUIRED TO PULL 1CUTTERS CLEAR OF CUT Printed 12/11/2017 3:52:48PM *All depths reported in Drillers Depths* 411 North America ALASKA-BP • Page 5 ' Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. I BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT I Total Depth , Phase Description of Operations (hr) 1 (usft) j 12/1/2017 00:00 - 01:00 1.00 FISH P ; 3,450.00 DECOMP CONTINUE TO PULL OUT OF THE HOLE AND I LAY DOWN SLB CASING CUTTER ASSEMBLY II FROM 2380'MD j' -MONITOR HOLE FILL WITH TRIP TANK; I GOOD FILL -GOOD INDICATIONS OF CUT ON THE r_ I CUTTER KNIVES 01:00 - 01:30 0:50 FISH P 3,450.00 DECOMP ;PULL AND LAY DOWN THE 7-1/8"ID WEAR -- RING 01:30 - 02:00 0.50 FISH P , 3,450.00 , DECOMP RIG UP TO PULL 7-5/8"CASING I-RIG UP DOYON CASING TONGS I I-MAKE UP SPEAR ASSEMBLY PER SLB I REPRESENTATIVE !-RUN IN AND ENGAGE THE 7-5/8"CASING WITH THE CASING SPEAR -BACK OUT LOCK DOWN SCREWS PER FMC iREPRESENTATIVE 02:00 - 02:30 0.50 FISH P I 3,450.00 DECOMP I PULL 7-5/8"CASING HANGER TO RIG FLOOR I AND LAY DOWN -PULLED OFF SEAT AT 115 KLBS,AS IPLANNED -LAY DOWN SPEAR ASSEMBLY ,-LAY DOWN 7-5/8"CASING HANGER w .. 02:30 - 03:00 0.50 FISH- P ' 3,450.00 DECOMP CIRCULATE TO CLEAN UP 7-5/8"ANNULUS I -10 BPM, 150 PSI MONITOR WELL FOR 10 MIN,STATIC 03:00 - 06:00 I 3.00 FISH P 3,450.00 DECOMP EPULLAND LAY DOWN 7-5/8"CASING FROM CUT AT 3004'MD -PU 115 KLBS,SO 105 KLBS AT 3000'MD I j I-MONITOR HOLE FILL WITH TRIP TANK; I GOOD FILL 1 I-NO ISSUES PULLING OUT OF HOLE WITH CASING I -RECOVER:(73 EA)FULL JTS,36.18'CUT JOINT I -CASING CUT SIGNIFICANTLY DEFORMED, I WITH SPLIT IN ONE SIDE;INDICATION THAT I 7-5/8"CASING IS IN COMPRESSION AT LOCATION OF CUT I -NEGATIVE NORM FOR ALL 7-5/8"CASING , AND 4-1/2"TUBING 06:00 - 07:00 1.00 FISH P I 3,450.00 DECOMP CLEAN AND CLEAR RIG FLOOR AFTER 'LAYING DOWN 7-5/8"CASING,RIG DOWN I I DOYON CASING TONGS 07:00 - 07:30 0.50 CLEAN ,I P 3,450.00 WEXIT RUN 9-15/16"ID WEAR RING 07:30 - 11:30 4.00 CLEAN P 3,450.00 WEXIT MAKE UP 10-3/4"SCHLUMBERGER I CLEANOUT ASSEMBLY FROM SURFACE TO 11045 MD -8-1/2"USED INSERT BIT,(2)9-3/4" WATERMELON MILLS,(6)6"SPIRAL DRILL COLLARS,(27)5"WIRED HWDP -FIRST RUN IN HOLE WITH NEW WIRED DRILL PIPE,REVIEW HANDLING PRACTICES I !WITH NOV REP AND RIG CREW Printed 12/11/2017 3:52:48PM 'All depths reported in Drillers Depths* • North America-ALASKA BP • Page 6a Operation Summary Report r u.. Common Well Name:L-205 AFE No X3-018F8-C:Event Type:RE-ENTER-ONSHORE(RON) Start Date: 11/27/2017 End Date: (2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. _ BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To ' Hrs Task Code NPT ! Total Depth I Phase Description of Operations 1-11:30 - 12:30 1.00 CLEAN P 3,450.00 WEXIT I TRIP IN HOLE WITH 10-3/4"SCHLUMBERGER CLEANOUT ASSEMBLY FROM 1045'MD TO 2980'MD(UPPER WATERMELON MILL 7' BELOW PLANNED CIBP DEPTH)ON l IELEVATORS -4"HT-38(NON-WIRED)DRILL PIPE -NO ISSUES RUNNING IN HOLE(NO SIGNS OF SUBSIDENCE) I-MONITOR DISPLACEMENT WITH TRIP TANK; GOOD DISPLACEMENT -TRIPPING SPEED 90 FPM 12:30 - 14:00 1.50 CLEAN P 3,450.00 WEXIT CIRCULATE HOLE CLEAN WITH 35 BBL HI-VIS SWEEP SURFACE TO SURFACE -730 GPM,1900 PSI I-RECIPROCATE 40'STROKE WITH MILLS 'ACROSS CIBP SET DEPTH WHILE CIRCULATING I-NO SIGNIFICANT SOLIDS AT SHAKERS I WHEN SWEEP CAME BACK '-FLOW CHECK FOR 10 MIN PRIOR TO PULLING OUT OF HOLE,STATIC 14:00 - 15:00 1.00 CLEAN P � 3,450.00 WEXIT TRIP OUT OF HOLE WITH 10-3/4" l SCHLUMBERGER CLEANOUT ASSEMBLY FROM 2980'MD TO 1045'MD ON ELEVATORS 1-NO ISSUES TRIPPING OUT OF HOLE 1-MONITOR HOLE FILL WITH TRIP TANK; ` 11GOOD FILL -TRIPPING SPEED 200 FPM 15:00 - 16:30 1.50 CLEAN P 3,450.00 WEXIT !RACK BACK AND LAY DOWN 10-3/4" I SCHLUMBERGER CLEANOUT ASSEMBLY FROM 1045'MD TO SURFACE I -RACK BACK 5"WIRED HWDP AND 6"DUMB I 'IRON DRILL COLLARS FOR UPCOMING WHIPSTOCK RUN -FLOW CHECK FOR 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH THE -- 'STACK 16:30 - 17:00 0.50 1 DHB P 3,450.00 WEXIT MAKE UP 10-3/4"BAKER CIBP AND RUNNING TOOLS -FLOW CHECK FOR 10 MIN PRIOR TO RUNNING IN HOLE,STATIC 17:00 - 18:30 1.50 DHB P 3,450 00 WEXIT I TRIP IN HOLE WITH 10-3/4"BAKER CIBP I FROM SURFACE TO 2955'MD ON 4"HT-38 I 'DRILL PIPE -TRIPPING SPEED 100 FPM 18.30 - 19.00 0.50 DHB P 2,953.00 WEXIT SET BAKER CIBP AT 2953'MD(TOP OF PLUG), RELEASE FROM RUNNING TOOL AND RACK BACK ONE STAND -TOP OF PLUG ESTIMATED TO BE 6'ABOVE - I 10-3/4"COLLAR AT 2959'MD Printed 12/11/2017 3:52.48PM *All depths reported in Drillers Depths* . North America-ALASKA BP . Page 7 VIr Operation Summary Report Common Well Name.L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM I Rig Release: I Rig Contractor:PARKER DRILLING CO. ____LI BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations I (hr) (usft) I 19:00 21:00 2.00DHB P 2,953.00 WEXIT PRESSURE TEST 10-3/4"CASING AND BAKER i CIBP TO 2000 PSI FOR 30 MIN 1 TEST AGAINST ANNULAR PREVENTER I -2 BELS TO PRESSURE UP,2 BBLS BLED IBACK -75 PSI LOST IN FIRST 15 MIN,25 PSI LOST IN I SECOND 15 MIN;TEST PASSES ACCORDING I TO ACCEPTANCE CRITERIA 3B IN BP I PRACTICE 100218(10-45) I 1-TEST APPROVED BY WSUP I I-USE PRESSURE CROSSCHECK PRIOR TO !INITIATING TEST I SEE ATTACHED PRESSURE TESTING CHART AND CALCULATOR '21:00 - 21.30 0.50 DHB P 2,953.00 I WEXIT 1DISPLACE WELL TO 9.6 PPG LSND MILLING I jFLUID ! i-750 GPM,950 PSI 21:30 - 22:00 0.50 DHB I P 2,953.00 WEXIT I TRIP OUT OF HOLE WITH CIBP RUNNING !TOOL FROM 2860'MD TO SURFACE ON ELEVATORS,LAY DOWN RUNNING TOOL 1-TRIPPING SPEED 200 FPM 22:00 - 22:30 ! 0.50 DHB P 2,953.00 WEXIT CLEAN AND CLEAR RIG FLOOR 22:30 - 23.30 1.00 BOPSUR P 2,953.00 1 WEXIT .CHANGE UPPER RAMS FROM 7-5/8"FIXED TO _ 12-7/8"X 5"VARIABLES ' -SIMOPS:CHANGE OUT DUMB IRON HT-38 _ 1 SAVER SUB TO WIRED DS-50 SAVER SUB I 23:30 - 00:00 0.50 BOPSUR P I 2,953.00 WEXIT I SERVICE RIG FLOOR PIPE HANDLING I 'EQUIPMENT 12/2/2017 00:00 - 02:00 2.00 BOPSUR, P 2,953.00 WEXIT TEST UPPER 2-7/8"X 5"VARIABLE RAMS TO 1250 PSI LOW/3500 PSI HIGH FOR 5 MIN !EACH WITH 5"TEST JOINT MAKE UP 5"TEST JOINT I-PULL 9-15/16"WEAR RING 1 -INSTALL TEST PLUG 1-PRESSURE TEST RAMS -PULL TEST PLUG -INSTALL 9-15/16"WEAR RING 1-RIG DOWN TESTING EQUIPMENT 02:00 - 03:30 1.50 STWHIP P I 2,953.00 I WEXIT I MAKE UP SCHLUMBERGER 10-3/4" I WHIPSTOCKASSEMBLY FROM SURFACE TO 1138'MD -10-3/4"WHIPSTOCK,9-3/4"TRIMILL,(6)6" I DRILL COLLARS AND(27)5"WIRED DS-50 ! I HWDP OUT OF DERRICK j -FLOW CHECK FOR 10 MIN PRIOR TO RUNNING IN HOLE,STATIC 03:30 - 08:30 5.00 STWHIP i P 2,953.00 WEXIT TRIP IN HOLE WITH SCHLUMBERGER 10-3/4" WHIPSTOCK ASSEMBLY FROM 1138'MD 2900' MD ON ELEVATORS -RUN ON 5"WIRED DS-50 DRILL PIPE SINGLES FROM THE PIPE SHED I-TRIPPING SPEED 60 FPM -MONITOR DISPLACEMENT WITH TRIP TANK; GOOD DISPLACEMENT Printed 12/11/2017 3:52:48PM *AII depths reported in Drillers Depths* • North America ALASKA-BP • Page 8 Operation Summary Report Common Wet Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date 1 From-To , Hrs Task Code NPT Total Depth Phase Description of Operations 1 (hr) i 11 (usft) 08:30 - 09:00 0.50 STWHIP P 1 2,925.00 WEXIT 1 ORIENT WHIPSTOCK TO 40°LEFT OF HIGHSIDE AND SET WITH TOP OF SLIDE AT 2925'MD 1-ORIENT WITH MWD I -TAG EZSV AT 2953'MD AS EXPECTED -PICK UP 2'AND SET WHIPSTOCK PER SCHLUMBERGER FISHING REP -SLACK OFF 40 KLBS TO CONFIRM SET AND SHEAR MILLS FROM WHIPSTOCK 109:00 - 10:00 1.00 STWHIP N i 2,925.00 WEXIT �ATTEMPT TO INITIATE MILLING WITH NOVOS SYSTEM AND TROUBLESHOOT 1 1-NOVOS OUTPUT INCORRECT PUMP RATE, ROP AND WOB PARAMETERS 1-TROUBLESHOOT AND RE-INITIALIZE I SYSTEM TO RESOLVE ISSUE 1 O-_ , 10:00 - 16:00 6.00 STWHIP P i 2,941.00 WEXIT MILL 9-3/4"WINDOW FROM TOP OF J I 1 WHIPSTOCK AT 2925'MD TO BOTTOM OF r A WHIPSTOCK AT 2941'MD PER SCHLUMBERGER FISHING REP • 1-520 GPM,1240-1275 PSI,60-90 RPM,6-8 I KFT-LBS TQ ` 1-INITIATE MILLING WITH 1 KLBS WOB,1 FPH ROP,60 RPM 1--INCREASE TO 3-5 KLBS WOB,3 FPH AND 90 I {RPM AFTER FIRST 1.5'OF MILLING I ( -MW 9.6 PPG IN/OUT 1 -NOVOS AND SOFTSPEED ACTIVE !-SIMOPS:BUILD STANDS OF WIRED 5"DS-50 1 DRILL PIPE OFFLINE ! ' 1 SLOW PUMP RATES @ 2925'MD WITH 9.6 :PPG LSND: MP#1:30 SPM=185 PSI,40 SPM=230 PSI 1 1 MP#2.30 SPM=180 PSI,40 SPM=235 PSI 16:00 - 20:30 4.50 STWHIP P 2,961.00 WEXIT !DRILL 20'OF NEW FORMATION FROM 2941' •MD TO LEAK-OFF TEST DEPTH OF 2961'MD -520 GPM,1250-1280 PSI,90 RPM,7-8 KFT-LBS TQ,2 KLBS WOB 1 -NOVOS AND SOFTSPEED ACTIVE -DRIFT WINDOW WITH/WITHOUT PUMPS AND ROTATION WITH NO ISSUES 1 1 1-SIMOPS:BUILD STANDS OF WIRED 5"DS-50 !DRILL PIPE OFFLINE 120:30 - 21:30 I 1.00 STWHIP P , 2,961.00 WEXIT CIRCULATE HOLE CLEAN WITH 35 BBL HI-VIS SWEEP SURFACE TO SURFACE -650 GPM,1750 PSI,80 RPM,7 KFT-LBS TQ ,-RECIPROCATE PIPE 60'WHILE - 1 CIRCULATING 1-NO INCREASE IN CUTTINGS OBSERVED AT SHAKERS FROM SWEEP �— I .- -FLOWCHECK WELL FOR 10 MIN(STATIC) -_— -- -- -- ----------------- Printed 12/11/2017 3:52:48PM *AII depths reported in Drillers Depths* WELLHEAD= FMC L-205 SAFETY NOTES_WELL ANGLE>70°@ 5257'"'*MOTFEiBORE ACTUATOR= OWI . (L1, L2, L3, L4 & L5) ABOVE lir LOTS IS ALL I3CR(TBG,PUPS,LEM S) KB.ELEV 76.1' REF ELEV -- -- 76.1' 20"CONED, HI 153' J 1 BE E .EV= 48.83' 129#,X-56, 2925' H 10-3/4"WHIPSTOCK(12/02/17) KOP --.----- -- 300' D-18.770" Max Angie= 103°@ 5878' 2953° -110-3/4"CEP(12/01/17) -- Datum MD= N/AJ 3004° H7-5/8"CSG STUB Datum TVD= 4400'SS 10-3/4"CSG, 13026' Y 45.5#,L-80 BTC,D=9.95" 4-1/2"JET CUT TBG(10/31/17) - 3540' 'rill It, 3558° H7-5/8"X 4-1/2"HES TNT PKR,ID=3-856" Minimum ID: 3.688" @ 4837' 3591' -14-1/2"HES X ND,D=3-813" BKR HOOK HGR ASSY w/SEALING LEM 3620° -I4-112"HES xNIP,D=3.813" 4-1/2"TBG,12.6#,13CR VAM TOP, - 3666° ----------, 3659' H7-5/8"X 4-1/2"SETTING SLV,D=3.950" .0152 bpf,D=3-958" a/ a 3666° H4-1/2"MULESHOE,D=3-958" DUMP BAIL CMT(10J23/17) H 4558° 4.Z _ A•.,• 3673' H 7-5/8"X 4-1/2"PREM PKR,D=3.870" ...lb- 4-1/2"WFD CIBP(10/22/17) -i 4585° ,741, !! 4605° H 5-3/4"FORTED SEAL STEM ASSY,D=4-750" 4-1/2"LNR, 12.6#,13CR-85 VAM TOP, - 4593' 0152 bpf,ID=3.958" 4800" H4-1/2"DP(10/19111) ma Da II - 12:1-- --1:----1L5(NI))LEM WINDOW 47° 7-5/8"X 5-1/2"BKR ZXP LTP -I 4604' , L5(Nb) 4-1/2= - -RA TAG @522' 4640'-4653' &TN�K,D=4.970" ® ® -- OPENING WIDTH=3.33" 5-1/2"X 4-1/2"XO,D=3.940" H 4624' 4 4781° H7-5/8"X 5-1/2"BKR ZXP LTP/TEBK,D=4.970" BAKER HOOK HANGER ASSY H $636' w/L3 SEALING LEM,D=3.688" 19'r\ 48�• -1SEAL BORE EXTENSION,ID=4.75" 7-5/8"RA T AG H 4726° I \ 4819' -15-1/2"X 4-1/2"XO.D=3.958" 13CR LEM#3 LOWER SEAL ASSY,ID=3.880" -1 4813' \ BM rsa-I - 22-12:1- - L4(OA)LEM WINDOW 56' BAKER HOOK HANGER ASSY -1 4837' L4( 4-1/2"RA TAG @ 6898' 4841'-4853' • w/L2 SEALING LEM,D=3.688" OPENING WIDTH=3.33" 7-5/8"RA TAG -I 4943' ,--11 4945° -17-5/8"X 5-1/2"BKR ZXP LTPI TIEBK,D=4.970" 13CR LEM#2 LOWER SEAL ASSY,D=3.90" --I 4974' el 4964° H 19-1/2'SEAL BORE EXTENSION,D=4.75" BAKER HOOK HANGER ASSY -I 4999' \\\ w/L1 SEALING LEM,D=3.688" 4983' -15-1/2"X 4-1/2"XO.D=3.910" 7-5/8"RA TAG -I 5084° \ L3(Qga) 4-1/2"RA TAG @ 7357' L3 tOBa 50LE02 510NDOW 620 13CR LEM#1 LOWER SEAL ASSY,D=3.88" - 5148' '=! OPENING WIDTH=3.33" W . 5101' -17-5/8"X 5-1/2"BKR ZXP LTP/TEBK,ID=4-950" 7 5/8"CSG,29.7#,L-80 BTC-M -I 5582' :in" .0459 bpf. D=6.875" 5132' -119'SEAL BORE EXTENSION,D=4.75" 4-1/2"SOLID LNR,12.6#,13CR-80 -I 5594' X 5151° H5-1/2"X 4-1/2"XO.D=3.880" VAM TOP,.0152 bpf,ID=3.958" I I I PERFORATION SUMMARY '=' REF LOG:SVVS Lvw VARIOUS DATES I I 1-205(013b) ANGLE AT TOP PERF: N/A � III .�• `�J' Note:Refer to Production DB for historical perf data • 5814' 6"WFD FLOW THRU ALUMINUM BILLET LNR I�' SIZE SPF NVTERVAL Opn/Sgz DATE (BI3-9ND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION ,i L1 (0Bc) I I I I 4-1/2"SOLID LNR, 12.6#,L-80, -I 8955' 5751' 6"WFD FLOW THRU ALUMINUM BILLET LNR .0152 bpf,D=3.958" 1(1311•11ND SLOTTED LINER) DATE REV BY CONVENTS DATE REV BY COMBvUVTS ORION INT 07/08/08 N9ES ORIGINAL COMPLETION 11/01/17 MS/AD JET CUT TBG(10/31/17) WELL: L-205,L1,L2,L3,L4&L5 11/17/11 016 RVVO PERMIT Nb:2080530(540)(580)(550)(560)(570) 07/26/17 JN@JJMD ADDED REF&BF ELEV AR Nb:50-029-23388-00(60)(64)(61)(62)(63) 08/03/17 JGUJMD PULLED XX PLUG(07/31/17) SEC 34,T12N,R11 E,2361'FSL&1493'FWL 10/17/17 JMG/JMD GLV C/O(10/16/17) 10/24/17 BTN/JMD SET CBP&DUMP BAIL CMT BP Exploration(Alaska) L-205 (L1, L2, L3, L4 & L5) • r is I sz sz I I I I _. ►z ii ii = ;_i! rib PBTD 8616' Cg 0 .,� \ rszi ►• _ 111 _ . rwl _ _ -Z. 4-16"SWH.4 -L PKR t 04', 5449',6540'&7035',D=3.90' � ' .. .-_ - - - --rap- - ._. PERFORATION SUMMARY 4636' 8630',6.75"L5(Nb) REF LOG:SWS LWD VARIOUS DA!ES 4-12"LNR L-80 IBT-M. .0152 bpf,ID=3.958" • ANGLE AT TOP PERF:N/A r Note:Refer to Production DB for historical pert data OA PBTD H 8750' SIZE SPF ZONE i 1TERVAL Opn/Sqz DATE \ clan cm / 4-1/2" SLID Nb 5480-6522 **C 07/05/08 ® =3.90 _ // 4-1/2" SLID Nb 7061-8574 **C 07/05/08 `4-1/2"SWELL PKR @ 4925',5279',6915'&7419",D=3.90" 4-1/2" SLID OA 5320-6898 0 06/29/08 - 1:Er-® 4-1/2" SLID OA 7445-8709 0 06/29/08 0 4853'-8763'.6.75"L4 (OA) 4-112" SLID OBa 5478-7357 0 06/23/08 ��� 4-1 2"LNR. L-80 BT-M _0152 bpf.C=3 958" 4-1/2" SLID OBa 7918-8797 0 06/23/08 Fe Y 4-1/2" SLID OBb 6382-8910 0 06/06/08 4-1/2" SLID OBc 5774-6098 0 06/10/08 OBa PBTD — 8839° — 4-1/2" SLID OBc 6413-8948 0 06/10/08 �� Im 4-1/2" SLID OBd 5594-5827 0 06/16/08 4-1/2"SWELL PKR @ 5045',5419',7374'&7893",D=3.90" 4-1/2" SLID OBd 5913-7501 0 06/16/08 4-1/2" SLID OBd 8020-8886 0 07/07/084999' 8850'.6.75"L3 (OBa) A. 4-1-2"LNR L-80 IBT-M. .0152 bpf ID=3.958" **NB PERES ISOLA I ED ` OBb PBTD —I 8951° X 4-1/2"SWELL PKR @ 5842',D=3.90" / = I ;.r'•4 5813'-8953',6.75"L-205(OB! : I � 4-1(2" LNR L-80 lBT-M. .0152 bpf,ID=3 958" 4-1/2"RA T AG —{ 5847' \ I r OBc PBTD H 8988' 4-1/2"SWELL PKR D=3.90" 5865' i I 4-1/2"SWELL PKR @ 6116',D=3.90" 4-1/2"RA TAG 7508' rAl 4-1/2"SWELL PKR,U=3.90" — 7526' 5751'-1990',6.75"L1 (OBc) 4-1/2"SWELL PKR,D=3.90" — 7996' A 4-1 LNR. L-80 BT-M. 0152 bpf, ID=3.958" _ 5101'-8965',6.75"L2 (OBd) OBd PBTD 8955' 4-1/2"LNR. L-80 IBT-M. .0152 bpf. ID=3.958" DATE REV BY CORIvR"JTS DATE REV BY COMENTS ORION UNT 07/08/08 N9ES ORIGINAL COMPLETION 11/01/17_MS/JMJ JET CUT TBG(10/31/17) WELL: L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO I1T2MIT No:2080530(540)(580)(550)(560)(570) 07/26/17 JNL/JND ADDED REF&BF ELEV API No:50-029-23388-00(60)(64)(61)(62)(63) 08/03/17 JGUJWD PULLED XX PLUG(07/31/17) SEC 34,T12N,R11 E,2361'FSL&1493'FAL 10/17/17 JMG/JMD GLV GO(10/16/17) 10/24/17 BIWJWD SET CEP&DUMP BAL CMT BP Exploration(Alaska) or T •• • V`, 1%7,•,s, THE STATE Alaska Oil and Gas Of onserVation Commission 333 West Seventh Avenue em^wh, GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OF ALAS/1‘P Fax: 907.276.7542 www.aogcc.alaska.gov Kenneth Allen Engineering Team Lead SCANNED SES, 1 12.011 BP Exploration(Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-205L4 Permit to Drill Number: 208-056 Sundry Number: 317-374 Dear Mr. Allen.: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Commissioner DATED this day of September, 2017. RBDMS (,‘/ SEP - 8 2017 STATE OF ALASKA ONLASKA OIL AND GAS CONSERVATION COMMA. APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0 • Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 208-056 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0•• 6. API Number: 50-029-23388-62-00 • 99519-6612 Stratigraphic 0 Service ❑ 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No I 1 L-205L4 , ,.r }■■}fi p 9. Property Designation(Lease Number): 10. Field/Pools: oT ci / 9 (11 ADL 028239&028241 • PRUDHOE BAY,ORION SCHRADER BLUFF OIL •p�.t.iz 0 8 9+) / 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): kl : ,,�► .,+t'' 8763 • 4269 • 3486 3132 1602 3486 None Casing Length Size MD TVD Burst Collapse Structural Conductor 124 20" 29-153 29-153 3060 1500 Surface 2997 10-3/4" 29-3026 29-2739 5210 2480 Intermediate 5555 7-5/8" 27-5582 27-4247 6890 4790 Production Liner 5090 4-1/2" 3662-8752 3284-4269 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 5320-8709 4264-4266 4-1/2"12.6# 13Cr80 24-3669 Packers and SSSV Type: 4-1/2"HES TNT Perm Packer Packers and SSSV MD(ft)and TVD(ft): 3561/3197 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary 0 Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 • Service 0 14.Estimated Date for Commencing Operations: "1 J' )17" 15. Well Status after proposed work: / Oil 0 WINJ 0 WDSPL 0 Suspended 0 • 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Raese,J.Kyle be deviated from without prior written approval. Contact Email: john.raese@bp.com Authorized Name: Allen,Kenneth W Contact Phone: +1 9075644629 Authorized Title: Engineering Team Lead Authorized Signature: .../.......404:3Date: g19// 9 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 3t7- 3-7l{ Plug Integrity 0 BOP Test kr Mechanical Integrity Test 0 Location Clearance ❑ Other: 5d p tt 5 f-- t0 3 5 0 0 t f}ylvvlGt ,OVt (/fvt.t,t-_.,,-(l'' z'2� td Z�U° i�5 ` 5 Post Initial Injection MIT Req'd? Yes 0 No (7 Spacing Exception Required? Yes 0 No Subsequent Form Required: /(' if-() APPROVED BYTHE Approved by:*iai---)4t,e...141.7......_ COMMISSIONER COMMISSION Date:q-‘,-/7 V?'L SII/ //I ORIGINAL ,� 4 4� - 20�, A- Y% RBDMS SEP8 etc).(7 Submit Form and Attachments in Duplicate Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. • • RECEIVED 0 bp AUG 082017 AOGCCGP6p 6 /erPiufIioe ildr L-2O5L4 Sundry Application Well Type: Producer Current Status: Shut-in Request: Abandon for rotary rig sidetrack Planned Pre-Rig Work Start Date: September 1, 2017 Planned Rig Start Date: November 1, 2017 MIT-OA Passed to 1080 psi (8/4/2016) MIT-IA Passed to 3500 psi (11/17/2011) PPPOT-T Passed to 5000 psi (8/2/2016) PPPOT-IC Passed to 3500 psi (8/2/2016) MASP: 1,602 psi (8.96 ppg EMW in Schrader Bluff-OBc at 4,379' TVDss with 0.1 psi/ft gas gradient) Well History: The L-205 well was drilled and completed in 2008 as a multi-lateral well. L-205 has major damage at the L5 junction and has produced sand and rocks, rendering it unfit for production. There is currently an obstruction at the L5 junction restricting access below. All remaining options to re-access the L- 205 laterals have been exhausted. Due to the history of solids production and the inability to clean the wellbore, it has been released for sidetrack. (o4 ,115M(/7y�� Scope of Work: Prior to rig arrival, a bridge plug will be set in the 4-1/2" scab liner and 25' of dump bail cement will be placed on top of the plug. Top of cement will be tagged and wellbore integrity will be verified. The tubing will then be cut above the production packer. The rig will pull the 4-1/2" tubing and cut and pull the 7- 5/8" casing from —3000' MD. A bridge plug will be set above the 7-5/8"casing stub.A whipstock will be set on the bridge plug and a window will be milled in the 10-3/4" surface casing. BP is requesting a variance from 20 AAC 25.112 Well Plugging Requirements c.1.E. The objective of the L-205A sidetrack is to drill a slant well near the existing L-205 laterals so that their remaining reserves may be accessed via hydraulic fracturing and produced through the new sidetrack. For this reason, it is not desired to abandoned the existing laterals with cement. Instead of cementing individual laterals, it is proposed that a bridge plug will be set in the 4-1/2" scab liner(above all lateral junctions) with 25' of dump bail cement on top to satisfy abandonment requirements. However, it is proposed to set the bridge plug at —4100' MD which is greater than the 50' maximum above perfs as stipulated in 20 AAC 25.112.c.1.E. The shallower set depth is proposed due to obstructions encountered near the L5 junction and to help ensure successful setting of the plug. Note that the 4-1/2" scab liner has been fully cemented and that the top of annular 7-5/8" casing cement is estimated at—4000' MD. Thus, the dump bail cement at—4100' MD will complete a full lateral cement barrier above the Schrader reservoir. L-205L4 Sundry 1 8/7/2017 • • (\i"‘$) Proposed Pre-Rig Operations: Step Service /7 Operation 1 S Drift for CIBP &Jet,Cut. 2 E Set CIBP at—410' MD. Dump Bail 25' Cement. F NEL: Load &Circ Well. CMIT-TxIA to 2000 psi. E Jet Cut Tubing at—3540' MD 3 S D&T Cement. 4 F CMIT-TxIA to 2000 psi. MIT-OA to 1200 psi. 5 W PPPOT-IC and PPPOT-T. Function LDS. 6 V Install Dry Hole Tree. Install Annulus Valves. Set BPV. Proposed Drilling Rig Operations: 1. MIRU Parker 272. 2. Test BPV from below to 2000 psi. 3. Nipple down dry hole tree. Nipple up BOPE and test to 3500 psi. 4. Pull BPV. Circulate out freeze protect. 5. Pull the 4-1/2"tubing from the pre-rig jet cut at—3540' MD. 6. MU casing cutter and cut 7-5/8"casing at—3000' MD. 7. Pull 7-5/8" casing from cut. 8. RIH with 9-3/4"clean out assembly down to the top of the 7-5/8"casing stub. 9. RU E-line and set bridge plug at—2900' MD. Pressure test 10-3/4"casing to 2000 psi. 10. PU 10-3/4"whipstock and 9-3/4"window milling assembly. Orient and set the whipstock at 2900' MD. 11. Displace the well to LSND milling fluid. End of Sundry/Start of Permit to Drill 12. Mill window in the 10-3/4"casing plus 20'-50' of formation. 13. Perform LOT. POOH. 14. MU 9-1/2" production drilling BHA(GR/RES/PWD/NEU/DEN) and drill through Schrader Bluff sands to TD at—7531' MD. Perform short trip. POOH. 15. Run 7-5/8" casing to TD and cement. Test casing to 3500 psi. 16. Install the 7-5/8" pack-off and test to 3500 psi. 17. Freeze protect the 10-3/4" x 7-5/8"annulus. 18. MU perforating assembly with MWD and fire guns on depth across multiple Schrader Bluff target zones. POOH. 19. MU cleanout assembly and clean across perforations. POOH. 20. Run 4-1/2" completion with production packers and frac sleeves spaced out across the multiple Schrader Bluff target zones. 21. With completion spaced out, RU E-line and log RA tags to confirm the completion is on depth. Land the tubing hanger. 22. Reverse circulate brine and corrosion inhibitor. Drop ball and rod and set production packers. Test tubing to 4000 psi. Test IA to 3500 psi. 23. Shear GLV and circulate freeze protect to—2000'TVD. Set TWC and test to 3500 psi. L-205L4 Sundry 2 8/7/2017 • 24. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 4500 psi. 25. RDMO Parker 272. Proposed Post-Rig Operations: Step Operation 1 Install Tree. Pull TWC. 2 Pull Ball & Rod. Pull RHC. Install DGLV. 3 MIT-T. MIT-IA. Injectivity Test. 4 Frac-Pack Well. Cleanup. 5 Install Generic LGLV. 6 Flowback Test. Drilling Engineer: Kyle Raese (907) 301-6405 Production Engineer: Alex Youngmun (907) 564-4864 Geologist: Sean Wagner (907) 564-4129 L-205L4 Sundry 3 8/7/2017 • •• • Loepp, Victoria T (DOA) From: Raese,J. Kyle <john.raese@bp.com> Sent: Thursday,August 31, 2017 5:57 PM To: Loepp,Victoria T(DOA) Cc: Allen, Kenneth W;Thompson,Jacob; Lastufka,Joseph N Subject: RE: PBU L-205(PTD 208-053, Sundry 317-376) Plug for Redrill Attachments: L-205 -Pre-Rig.pdf Victoria, Ok,thank you.Attached is the updated pre-rig schematic to reflect the new plug depth. Thanks, Kyle Raese Drilling Engineer BP Exploration (Alaska) 0:907-564-4629 c:907-301-6405 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,August 31,2017 5:41 PM To: Raese,J. Kyle<john.raese@bp.com> Subject: Re: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Yes Sent from my iPhone On Aug 31, 2017, at 5:16 PM, Raese,J. Kyle<john.raese@bp.com>wrote: Victoria, We will attempt to set the bridge plug at 4586' MD(50'above the L5 junction at 4636' MD). If we are unable to drift that deep with the bridge plug due to obstructions,would it be acceptable to set it as deep as possible? Thanks, Kyle Raese Drilling Engineer BP Exploration (Alaska) o:907-564-4629 c:907-301-6405 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,August 31,2017 2:43 PM 1 S • To: Raese,J. Kyle<john.raese@bp.com> Subject: RE: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Kyle, The regulations(20 AAC 25.112(c)(1)(E))state the mechanical bridge plug should be set no more than 50 feet above the top of the perforations. A depth somewhat closer to the junction would be desirable. Thanx, Victoria From: Raese,J. Kyle [maiito:john.raese@bp.com] Sent:Tuesday,August 29,2017 12:21 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Allen, Kenneth W<Kenneth.Alien@bp.com>;Thompson,Jacob<Jacob.Thompson@BP.com>; Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: RE: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Victoria, The obstructions near the L5 junction appear to start at 4619'on the most recent slickline drifts to this depth. Note that this drift run was performed two years ago with tools slightly under gauge to the OD of the proposed 4-1/2"CIBP. My intent in proposing to set the CIBP at 4100'was keep away from the obstructions in order to avoid issues setting the CIBP.That being said, it is likely possible to set the CIBP deeper than 4100'. Do you have a preferred depth range? The 7-5/8" annular TOC estimate was determined using volumes recorded during the cement job with an assumed 30%open hole washout(typical for our intermediate sections). No losses were noted during the job. Thanks, Kyle Raese Drilling Engineer BP Exploration(Alaska) 0:907-564-4629 c:907-301-6405 From:Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Friday,August 25, 2017 10:30 AM To:Raese,J. Kyle<john.raese@bp.com> Subject: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill John, Where is the top of the obstructions near the L5 junction? Can the CIBP be set deeper in the wellbore? How was the TOC in the 7-5/8" annular estimated? Thanx, Victoria Victoria Loepp 2 TREE= LNEAD_ 4-1/16"CMVFLI�S • L-205 Pre-RigWELSAFETII�ES:WELL ANGLE>70° 5257"""MOTHERBORE ACTUATOR= coM/ME6 (L-I, L2, L3, L4 & L5) ABOVEOBd SLOTS IS ALL I3CR(TBG,PUPS,LENS) KB.ELEV= 76.1' 20"COND, --{ 153' i I Li BF.ELEV= 74.38' 129#,X-56, ' 2196' --I 4-1/2"HES X NIP,ID=3.813" KOP= 300' ID=18.770" GAS LIFT MANDRELS Max Angle= 103°@ 5878' ret Cut tubing at-3540' MD ST MD TVD DEV TYPE VLV LATCH FORT DATE Datum MD= N/A 4-1/2^CIBP at 4586'MD En 3 2349 2174 33 KBG2 DMY BK 0 11/16/11 Datum TV D= 4400'SS w/25'of dump bail cement 2 3220 2904 31 KBG2 DMY BK 0 11/16/11 710-3/4"CSG,45.5#,L-80 BTC,ID=9.95" H 3026' 1 3338 3005 31 KBG2 SO BK 20 12/10/11 4-112"GAUGE CARRIER,ID=3.864" --1 3413' 3429' -14-1/2"HES SLD SLV,ID=3-813" 4-1/2"GUAGE CARRIER,ID=3.864" --1 3453' . 3486'_J-H4-1/2"HES X NIP,ID=3.813" 3558' H7-5/8"X 4-112"I-ES TNT PKR, ID=3.856" 1 .t._ - 3591' -14-1/2"HES X NIP,ID=3.813" 7-5/8"annular TOC at-4000' MD (30%washout) ' 3620' -14-1/2"HES X NIP,ID=3.813" 4-1/2"TBG,12.6#,13CRVAMTOP, H 3666' "------- 3659' H7-518"X 4-1/2"SEI IING SLV,ID=3.950" .0152 bpf,ID=3.958" 151 ►rte 3666' J--14-1/2"MULESHOE,ID=3.958" 4-1/2"LNR, 12.6#,13CR-85 VA TOP, 4593' """"ti � ►•r�� !. • �•• 3673' -7-5/8"X 4-1/2"PREM PKR, ID=3.870" .0152 bpf, ID=3.958 ►�j 0 4605' -5-3/4"PORTED SEAL STEM ASSY,ID=4.750" 7-5/8"X 5-1/2"BKR ZXP LTP -I 4604' / &TIEBK,ID=4.970" l / \ -II ffi-4624' -14-1/7'IBP(10/19/11) 5a isa - L5(Nb)LEM WiNOOW 47° 5-1/2"X 41/2"XO, ID=3.940" H 4624' L5(Nb) 4-1/2" , RA TAG§6522' 4640'-4653' BAKER HOOK HANGER ASSY H 4636' 1 '' _ - �' pp OPENING WIDTH=3.33" w/L3 SEALING LEM, ID=3.688" 0 4781' -17-5/8"X 5-1/7'BKR ZXP LTP/TIEBK,ID=4.970" 7-5/8"RA TAG - 4726' 13CR LEM#3 LOWER SEAL ASSY,ID=3.880" -1 4813' 4800' 19'SEAL BORE EXTENSION, ID=4.75" 4819' -I5-112"X 4-1/2"XO. ID=3.958" BAKER HOOK HANGER ASSY -1 4837' 1-- w/L2 SEALING LEM,ID=3.688" e - L4(OA)LEM WINDOW 56° peo 4-1/2"RA TAG 6898' 4841'-4853' OPENING WIDTH=3.33" 7-5/8"RA TAG H 4943' 1-11 4945' --17-5/8"X 5-1/7'BKR ZXP LTP/TIEBK,ID=4.970" 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" H 4974' 0 0 4964' -119-1/2'SEAL BORE EXTENSION,ID=4.75" BAKER HOOK HANGER ASSY -I 4999' w/Li SEALING LEM,ID=3.688" 4983' 5-1/2"X 4-1/2"XO.ID=3.910" .,. i L3(OBa)LEM WINDOW 62° 7-5/8"RA TAG -{ 5084' L3 t�) 4-1/2"RA TAG 7357' � 5002'-5015' 13CR LEM#1 LOWER SEAL ASSY,ID=3.88" -I5148' ® OPENING WIDTH=3.33" 5101' H7-518"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.950" 7 5/8"CSG,29.7#,L-80 BTC-M --I 5582' 41/7'SOLID LNR,12.6#, 13CR-80 -I 5594' X X� VAM TOP, .0152 bpf, ID=3.958" I I 5151' -15-1/2"X 4-1/2"XO.ID=3.880" I I PERFORATION SUMMARY - REF LOG:SWS LWD VARIOUS DATES I I L-2O5(CBb) ANGLE AT TOP PERF: NIA I Oh �,t• Note:Refer to Production DB for historical perf data I ,r•"� 5814' 6"WFD FLOW THRU ALUMINUM BILLET LNR SIZE( SPF 1 INTERVAL Opn/Sqz DATE I III ii' (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION ) I I I I i L� 4-1/2"SOLID LNR,12.6#, L-80, --1 8955' \ L2 5751' 6"WFD FLOW THRU ALUMINUM BILLET LNR .0152 bpf,ID=3.958" \ OBd) (BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 07/08/08 N9ES ORIGINAL COMPLETION WELL: L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO PERMT No:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMO DRLG DRAFT CORRECTIONS(12/06/11) AR No:50-029-23388-00(60)(64)(61)(62)(63) 12/0W11 PJC DRLG DRAFT CORRECTIONS . SEC 34,T12N, R11 E,2361'FSL&1493'FWL 12/13/11 TRJMD TREE SWAP(11/21/11) • 12/13/11 JLJ/JMD GLV C/O(12/10/11) BP Exploration(Alaska) WELLHEAD= FMC L-t U3 SAFETY NOTES:WELL ANGLE>70'@ 5257'°**MOTFE ORE ACTUATOR= _ C1W ME6('1 • (L.1, L2, L3, L4 & L5) ABOVIIII SLOTS IS ALL 13CR(TBG,PUPS,LEMS) • KB.ELEV= 76.1' I REF EV EL = 76.1' ' 2196° H4-1/2"HES X NP,D=3.813" BF �EV_ -- 48.83 20"CONE), - 153° GAS LFT MANDRELSKOP__ 30U' ST MD TVD DEV TYPE VLV LATCH PORT DATE Max Angle 103°@ 5878° 129#,X56, D=18.770" 3 2349 2174 33 KBG2 DMY BK 0 11/16/11 Datum MD= NIA2 3220 2904 31 KBG2 WY" BK 0 11/16/11 Datum TVD= 4400'SS / l 1 �3338 3005 31 KBG2� SO l BK 20 �12/10/11 1 10-3/4"CSG,45.5#,L-80 BTC,D=9.95" H 3026' III 3429' HI4-1/2"HES SLD SLV,D=3.813" 4-1/2"GAUGE CARPER,ID=3.864" - 3413' 3486' -I4-1/2"HES X NP,D=3.813" 4-1/2"GAUGE CARR62 DH _ =3.864" 3453' 41 3558' H 7-5/8"X 4-1/2"HES TNT PKR 0=3.856" 4-1/2"XX RUG w/EQ DEV(10/23/16) - 3486' 3591 H4-1/2"HES X NP,0=3.813" Minimum ID: 3.688" @ 4837' 1�------._ 3620' H4-1/2"HES XNIP,D=3.813" B K R HOOK H G R ASSY w/SEALING L E M -------I 3659' H 7-5/8"x 4-1/2"SETING SLV,D=3.950" 4-1/2"TBG,12.64,13CR VAM TOP, -I 3666' ► , 3666• H4-1/2"MULESHOE,ID=3.958" _0152 bpf,D=3.958" ••-•,.4i '••• . ►i�D 3673' H7-5/8"X 4-1/2"FREM PKR,D=3.870" 4-1/2"LNR, 12.6#,13CR-85 VA M TOP, H 4593• ! •••�• .0152 bpf,ID=3.958' 2 r 4 4606' -15-3/4"PORTED SEAL STEM ASSY,ID=4.750" 7-5/8"X 5-1/2"BKR ZXP LTP H 4604' 4800° H4-1/2"BP(10/19/11) &TiEBK,D=4.970' - - - -e133-- mg L5 f Nb aim V41NOO WINDOW 47° L5(Nb) I!4-1/2"- RA TAG 6522' 4640'-4653 5-1/2"X 4-1/2"X0,ID=3.940° -1 4624' / ° opeaNG wan-.3 33- BA KER HOOK HANGER ASSY 4636' 4 w/L3 SEA LNG LEM,D=3.688" / eil 4781' -I7-5/8"X 5-1/2"BKR ZXP LTPTEBK,D=4.970" 7-5/8"RA TAG -1 4726' /C 4800' H 19'SEAL BORE EXTENSION,D=4.75" 13CR LEM#3 LOWER SEAL ASSY,0=3.880" -I 4813' / 4$19' -15-1/2"X 4-1/2"XO.D=3.958" BAKER HOOK HANGER ASSY -I mor ®- - ,4(CIA I.,.Bvt` 56' wI L2 SEALNG LEM,ID=3.688" L4(0,4 4-1/2'RA TAG @ 6898' 4841' 4853' 1a 7-5/8"RA TAG -� 4943' -. OP9aNG WIDTH=3.33" ---1 4945' H7-5/B"X 5-1/2"BKR ZXP LTPYFEBK,D=4.970' 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" H 4974' 4 C.1 4064' H 19-1/2'SEAL BORE EXTENSION,0=4-75" BAKER HOOK HANGER ASSY -I 4999' w/L1 SEALING LEM,D=3.688" 4983' H 5-1/2'X 4-1/2"XO.ID=3.910" 3 108a t LIN WNDO'W 62° 7-5/8"RA TAG -1 5084' r•II- ii pa* 4-112'RA TAG @ 7357 13CR LBM#1 LO1AER SEAL ASSY,D=3.88" -I 5148' OPBWNG =3.3s- • 5101' H7-5/8"X 5-1/2"BKR ZXP LTP/TE BK,ID=4.950" 7 5/8"CSG,29.74,L-80 BTC-M -I 5582' ;Nu .0459 bpf. 0=6.875" 5132' H 19'SEAL BORE EXTENSION,D=4.75" 4-1/2"SOLD LNR 12.6#,13CR-80 --I 5594' X 5151' -I5-1/2"X 4-1/2"XO.ID=3.880" VAM TOP,.0152 bpf,D=3.958" I 1 I PERFORATION SUMMARY '-' REF LOG:SWS LWD VARIOUS DATES I I L-205(OBb) ANGLE AT TOP PERF: PYA � 11. 44, ':- Note:Refer to Production DB for historical pert data Co • 5814' 6"WFD FLOW TI-RU ALUMINUM BLLET LNR INTERVAL SIZE SIT IAOpn/Sgz DATE (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION i •-., ' 1 I 4-1/2"SOLID LNR,12.6#,L-80, 8955' 5751' 6"WFD FLOW TI-RU ALUMINUM BLLET LNR .0152 bpf,ID=3.958" 1' (BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BY COM EENTS ORION UNIT 07/08108 N9ES ORIGINAL COMPLETION 10/24/16 ZV/JMD SET XX PLUG(10/23/16) WELL: L-205,Li,L2,L3,L4&L5 11/17/11 016 RWO 07/26/17 JNJJMD ADD®REF&BF ELEV PERMIT No:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD DRLG DRAFT CORRECTIONS(12/06/11) API Na:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRL.G DRAFT CORRECTIONS SEC 34,T12N,R11 E,2361'FSL&1493'FWL 12/13/11 TPYJMD TREE SWAP(11/21/11) 12/13/11 JLJ/JM) GLV C/O(12/10/11) BP Bcploration(Alaska) L-LU • (L1, L2, L3, L4 & L5) • • 11 M Rill 8 ►. �� ►�_ iii`. 44 a♦ ♦► •.4P. :�4►P Nb PBTD 8616' F.2 0 I .... . - . _ _mi._ _ .... .. 4-1/2"SV1E_L FKR 0 i/04', 5449',6540'&7035' ID=390' lir- 71 .z. ._. - - - --ffi-- - -,--- PERFORATION _PERFORATION SUMMARY 4636'-8630'.6.75' REF LOG:SWS LWD VARIOUS DATES 4-1;2"LNR L-80 93T-Kit.0152 bpf. C=3 958" ANGLE AT TOP PEFRF:NIA Note:Refer to Production DB for historical pert data OA MID H 8750' FE SIZE SFF ZOINTERVAL Opn/Sqz DATE 4-112" SLID Nb 5480-6522 • 07105/0831__C237 - - // I 106 /29/08 `¢v � 2^SwL PKR4925',5279,6915'&7419",9 ID=390' 4-1/2" SLID CM 5320-6898 0 14-1/2" SLID OA 7445-8709 0 06/29/081 4853'-8 '63`.6 75- 4-1/2" SLID OBa 5478-7357 0 06/23/0810 $2 4-12' LNR,'_-80 ST-M 0152 bpf. C=3.958" 4-1/2" SLID OBa 7918-8797 0 06/23/08 4-1/2" SLID OBb 6382-8910 0 06/06/08 Oea�� 8839°4-1/2" SLID OBc 5774-6098 0 06/10/08 4-1/2" SLID OBc 6413-8948 0 06/10/08 4-1/2" SLID OBd 5594-5827 0 06/16/08IIII 4-1/2"WELL PKR @@ 5045',5419',7374'&7893",D=3.90" 4-1/2" SLID OBd 5913-7501 0 06/16/08 �� 4-1/2" SLID 019d 8020-8886 0 07/07/08 4999'-8850' 6.75" 1111 4-1 2"LNR L-80 ET-M, 0152 bpf. 0=3.958" ii'"NB FERFS ISOLATED , OBb MID —I 8951' X 4-1/2"SWELL Fi(R @ 5842',D=3.90' I � :. 5813'-8953'.6.75"L 4-1/2"RA T AG -I 5847' I .4'16 } 1:2"LNR L-8053'.6.1 .0152 bpf, 10=3.958" 11,1 OBc F$TD 8988' 4-1/2"SVWELL FXR D=3.90" — 5865' •=' a 4-1/2"SWELL PKR @ 6116',0=3.90' 4-1/2"RA TAG H 7508' d 4-1/2"SWELL PI02,D=3.90" — 7526° \ 5751'- ;990'.675" 4-1/2"SWELL PKR,D=3.90" — 7996' E LY 4-1'2"LNR, L-80 ET-M. 0152 bpf. C=3.958" 5101'-8965'.6.75" OBd FBTD —1 8955' 4-1!2"L . ,.,-80 RT-M, 0152 bpf ID=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS ORION MT 07708/08 N9ES ORIGINAL COMPLETION 10/24/16 ZV/JMD SET XX RUG(10/23/16) WELL L-205,Li,L2,L3,L4&L5 11/17/11 D16 laiVO 07/26/17 JNJJMD ADDED REF&BF ELEV FERMT Ib:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD CRLG DRAFTCORRECT1ONS(12/06/11) AR Ib:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRLG DRAFT CORRECTIONS SEC 34,T12N,R11E,2361'FSL&1493'PM, 12/13/11 TP/J144) TREE SWAP(11/21/11) 12/13/11 JLJ/JMD GLV CYO(12/10/11) BP aploration(Alaska) II-1tL: VVELLHEAD= 11'FMc PROPO D L_205NOTES: WELL ANGLE>70°@ ' ACTUATOR_ , REV 2 ( R) w1EC3<T13t�. OKs.ELEV= 77.6 r BF.ELB/= 53.80' / KOP= 380' 20#COND H 153' III —I4-1i2"HES X NP,D=3..813" Max Angle= _°@ 1 �,�t CIA1 a. ML-z6A) 29Gfit� r GAS LIFT MANDRELS Datum MD= I ST MD TVD DEV TYPE VLV LATCH FORT DATE Datum TVD= 4400'SS F0-3/4"WHIPSTOCK(...J._/____277-1-1 2900" 10-3/4"CSG-45.5#,L-80,ID=9.95" -H 2900' I 1' X 7-5/8"CSG,29.7#,L-80 XO TO 13CR 80 — �y , - - VAM TOP HC,D=6.875' .. + I k4-112"HES SLD SL Minimum ID = 3.725 @ XXXX 14-112"SGM-NDFG-GA SINGLE CROP SAFPI-IRE 4-1/2" HES XN NIPPLE a GAS D-3.864" —14-112-HES X NP,D=3.813' RA TAG 4-1/2"TUBING COLLAR — J1rr--�� RA TAG 7-5/8"CSG COLLAR — _--1 7-5i8"X 4-1/7 HES TNT FKR,D=3.856' I 4-112"HES X NP,D=3.813" 1 1 P _H4-1/2"NCS FRAC FORT,D=3-958' MEI —4-1/2"NCS SCREEN SLEEVE,C)=3.958" Z >_(' —17-5/8"X 4-1/2"HES TNT FKR,D=3.856" I I I H4-1/2"NCS FRAC FORT,D=3.958' MEI —4-1/2"NCS SCREEN SLEEVE,D=3.958" Zj�Z --17-5/r X 4-1/2"HES TNT FKR,D=3.856" �+�+♦ —14-1/7 NCS FRAC FORT,D=3.958' ape i —4-117 NCS SCREEN SLEEVE,D=3.958" XB —17-5/8'X 4-112"HES TNT PKR,D=3.856" PERFORATION SlANh4RY "" -1 H4-1/2"NCS FRAC PORT,ID=3.958' REF LOG: ANGLE AT TOP PERF: H 4-1/2" NCS SCREEN SLEEVE Note:Refer to Production DB for historical perf data MEI SIZE SPF ZONE I'1TERIIAL Opn/Sgz DATE Z H7-5/8"X 4-1/2"I IS TNT R(R,D=3.856" 4-3/8" 7 Nb 6175-6292'MD 0 4-3/8" 7 OA 6560-6670'MD O 1 I H4-1/2"NCS FRAC FORT,13=3.958' 4-3/8" 7 OBa 6731-6814'MD 0 4-3/8" 7 OBb 6833-6892'MD 0 4-3/8" 7 OBc 6987-7073'MD 0 I—4-1/2"NCS SCREEN SLEEVE,D=3.958" MEM 4-3/8" 7 OBd 7120-7260'MD 0 4-3/8" 7 OBe �X H7-5/8"X 4-1/2"HES TNT FKR,D=3.856" ✓ i - —I4-1/2"NCS FRAC PDR'!',D=3.958' H 4-1/2"NCS SCREEN SLEEVE,13=3.958" 4-1/2"TBG,12.6#,13CR 80 VAM TOP — Z, r ( H7-5/8"X 4-112"HES TNT FKR,D=3.856" .0152 bpf,ID=3.958' 7-5/8"CSG,29.7#,13CR-80 VAM TOP I-IC, — 7531' NNN 1 1 H4-1/2"I la,XN INP,D=3.725" D=6.875' --k — —14-1/2"WLEG,13=3.958' DATE FEV BY COMMENTS DATE REV BY COMMENTS ORION MIT 02/22/04 N9ES ORIGINAL COMPLETION WELL: L-205A 11/25/09 D-16 RING PERMIT No: 1 1 SIDETRACK(L-205A) AR No: 50-029-23388-01 08/08/16 NN BUILT PROPOSED SEC 34,T12N,R11 E,2361'FSL&1493'FAL 08/08/16 JH BOLT PROPOSED REV! BP Exploration(Alaska) . • • • _� th C ) o ; ce g m 8 ;4 j ;;Y�� o S o'3 a5 d omcLr O$ SMCIQ rQ Qw iA ',:RE �— as oQ w a 0— w ty m0OOO ��(U? b W(!j 8's,.7, S.4x3„3, sa • i ���a SS "��� a���r ovi vii\ ,...N gvaivaivai • • wmeow w?�� 0 z�� iiio- s- . .Lto_.•••-,-,,,,, .,„, ,.� to _ g00 ens m 2^' o x” U- -;.1 ___ Q r a, os og2 'am r 3 CI • w 8 w e B K i a K mr a Cii WR2 A3 W., mms 2aa 2a X i . ! . -xlIA . 16114.=.,11„,.)4,,6..,,Ai„iN I; ��I �In� a� _�� - ' E .4/L.-.) vain- ani S.-- cu-� 0 1 1 . �l I 1T ''� - �II� ! 3 U t1 , H- I ' `! .0-s I �( g44S 3* h I t255U �X0 0 2 w W 31m =w0 3wia g I =__ o f o � t !LI iCA_ as U ` \ U��¢ e130 MO W1130 S'01. - - off I\ r-,- m U .1r-,LZ r O —.h/f S-.9 -- .11-.11 ,Z/t Ot- I.a - -O O 5 z O- .v,S-.Zh C) O p odd M7RR130) - .SYSh • .TREE= 4-1/16°CM/FLS • L-205 Pre-Ri WELLHEAD= FMC g SAFETY:WELL ANGLE>70°@ 5257'""'MOTHERBORE ACTUATOR= CNVNE60 (L1 , L2, L3, L4 & L5) ABOVEOBd SLOTS IS ALL 13CR(TBG,PUPS,LEMS) KB. ELEV= 76.1' 20"GOND, --I 153' BF ELEV= 74.38' 129#,X-56, 2196' -14-112"HES X NIP,ID=3-813" KOP= 300' ID=18.770" GAS LIFT MANDRELS Max Angle= 103°@ 5878'. ret Cut tubing at-3540' MD ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum MD= WA 4-1/2"CIBP at-4100'MD N 3 2349 2174 33 KBG2 IYVW BK 0 11/16/11 Datum TVD= 4400'SS w/25'of dump bail cement 2 3220 2904 31 KBG2 DMY BK 0 11/16/11 10-3/4"CSG,45.5#,L-80 BTC,ID=9.95" H 3026' lIM 1 3338 3005 31 KBG2 SO BK 20 12/10/11 4-1/2"GAUGE CARRIER,ID=3.864" 3413' Ikl.6111111 3429' -14-112"HES SLD SLV, ID=3.813" 4-1/2"GUAGE CARRIER,ID=3.864" 3453' 111111111111111. 3486' -14-1/2"HES X NIP, ID=3.813" MI ►Z 3558' H7-5/8"X 4-1/2"FES TNT PKR,ID=3.856" 7-5/8" annular TOC at-4000' MD (30%washout) 1 3591' -14-1/2"HES X NIP,ID=3.813" 3620' -14-1/2"HES X NIP,ID=3.813" 41/2 TBG, 12.6#,13CRVAMTOP, -{ 3666' 11, -� 3659' H7-5/8"X 4-1/2"SEI I ING SLV, ID=3.950" 0152 bpf,ID=3.958" _ �� % • 3666' }-4-1/2"MULESHOE,ID=3.958" 4-112"LNR 12.6#,13CR-85 VAM TOP, - 4593' ���1 ��i�• 3673' -7-5/8"X 4-112"PREM PKR, ID=3.870" 0152 bpf, ID=3.958 ►�� C 4605' -5-3/4"FORTED SEAL STEM ASSY, ID=4.750" 7-5/8"X5.1/2"BKR ZXP LTP -1 4604' 4624' 4-1/2"IBP(10/19/11) &TIEBK,ID=4.970" \- ISM >a _II - LS(Nb) LEM WINDOW 47° 5-1/2'X 4-1/2'XO,ID=3.940" -I 4624' L5(Nb) 4-1l2" ' RA TAG @ 6522' 4640'-4653' BAKER HOOK HANGER ASSY -1 4636' ._. - - -mr- E OPENING WIDTH=3.33" w/L3 SEALING LEM,ID=3.688" 0 4781' H 7-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.970" 7-5/8"RA TAG-1 4726' 13CR LEM#3 LOWER SEAL ASSY,ID=3.880" -1 4813' 4800' 19'SEAL BORE EXTENSION,ID=4.75" 4819' -I5-1/2"X4-1/2"XO.ID=3.958" BAKER HOOK HANGER ASSY 4837' I... `- - - �®- - L4(OA)Levi WINDOW 56° w/L2 SEALING LEN,ID=3.688" 4-1/2"RA TAG a' 6898 L4{ . } 4841'-4853' 11 OPENING WIDTH=3.33" 7-5/8"RA T AG -1 4943' Es 4945' H7-518"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.970" 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" H 4974' 0 0 4964' H19-1/7 SEAL BORE EXTENSION,ID=4.75" BAKER HOOK HANGER ASSY -I 4999' w t Lt SEALING LEM,ID=3.688" 4983' -15-1/2"X 4-1/2"XO.ID=3.910" 7-5/8"RA TAG -I 5084' ii° L3 IOBa) 4-1/2"RA TAG @ 7357' L3(OB iksen_ 504 4NDOW fit° 15' 13CR LEM#1 LOWER SEAL ASSY,ID=3.88" 5148' OPENING WIDTH=3.33" 5101' H7-5/8"x5-t/2"BKR ZXP LTP/TIEBK,ID=4.950" 7 518"CSG,29.7#,L-80 BTC-M - 5582' .0459 bpf. ID=6.875" 5132' --119'SEAL BORE EXTENSION,ID=4 75" 4-1/2"SOLID LNR,12.6#:13CR-80 H 5594' x VAM TOP, .0152 bpf, ID=3.958" I 5151' 5-112'X 4-1/2"XO. ID=3.880" PERFORATION SUMMARY I REF LOG' SWS LWD VARIOUS DATES I I L-205(OBb) ANGLE AT TOP PERF N/A i I r2 f� Note:Refer to Production DB for historical perf data 00 ` 5814' -6"WED FLOW THRU ALUMINUM BILLET LNR SIZE 1 SPF [ INTERVAL Opn/Sqz DATE OA (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION I I I I � 81LI OBc 4-1/2"SOLID LNR, 12.6#. L-80, -I 8955' (8WMI L2 @ 5751' 6" FD FLOW THRU ALUNUM BILLET LNR 0152 bpf,ID=3.958" OBd) j(BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 07/08/08 N9ES ORIGNAL COMPLETION WELL. L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO PERMIT No.2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD DRLG DRAFT CORRECTIONS(12/06/11) AR No:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRLG DRAFT CORRECTIONS SEC 34,T12N, R11 E,2361'FSL&1493'FWi- 12/13/11 TP/JMD TREE SWAP(11/21/11) 12/13/11 JLJ/JMD GLV C/O(12/10/11) BP Exploration(Alaska) • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and jinitial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill"code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ©~- ~J ~ Well History File Identifier Organizing (done) RE CAN Color Items: ^ Greyscale Items: Two-sided IIIII~IIIIIIIIIIIII DIGI AL DATA Diskettes, No. 1 ^ Other, No/Type: Re,~a~~~,~,a iiiiuuuuiuii OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: p~ ~ ~ /s/ Pro "ect Proogn II I II'I II I I III ((III J g BY: Maria Date: O /s/ Scanning Preparation 3 x 30 = d + ~ =TOTAL PAGES S (Count does net include cover sheet) BY: Maria Date:. ~/ ~ /s/ Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ ~ /Q /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s II I II ~I I I I II II I I III Scanning is complete at this point unless rescanning is required. Rescanned III 111111 IIIII IIIII BY: Maria Date: /s/ mments about this file: Quality Checked III II'lII III II') III Co 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 2/3/2010 Permit to Drill 2080560 Well Name/No. PRUDHOE BAY UN ORIN L-205L4 Operator BP EXPLORATION (ALASYCa INC API No. 50-029-23388-62-00 MD 8763 TVD 4269 Completion Date 7/8/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / AZI Density / NEU /AIM / PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type meairrmt mcer Name scale meaia rvo start stop crr rcecervea comments I D D Asc Directional Survey 0 8763 Open 7/10/2008 pt Directional Survey 0 8763 Open 7/10/2008 C. Lis 16988-~nduction/Resistivity 239 8767 Open 10/1/2008 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD g Induction/Resistivity 25 Blu 4756 8713 Open 10/1/2008 TVD Vision Service 26-Jun- 2008 og Induction/Resistivity 25 Blu 4756 8713 Open 10/1/2008 MD Vision Service 26-Jun- 2008 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y~ Daily History Received? Chips Received? ~J-I"1 ~ Formation Tops ~/ N / Analysis Y~ Received? i Comments: DATA SUBMITTAL COMPLIANCE REPORT 2/3/2010 Permit to Drill 2080560 Well Name/No. PRUDHOE BAY UN ORIN L-205L4 Operator BP EXPLORATION (ALASKI~ INC API No. 50-029-23388-62-00 MD 8763 ND 4269 Completion Date 7/8/2008 Completion Status 1-OIL Current Status 1-OIL UIC N Compliance Reviewed By: Date: • ~J J Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Thursday, October 02, 2008 11:51 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU L-205 ! PTD # 208-053, etc. Hi Art, Please reference the following wells (Multilateral Legs): Well Name: PBU L-205 PBU L-205L1 PBU L-205L2 PBU L-205L3 PBU L-205L4 PBU L-205L5 Permit #: 208-053 208-054 208-058 208-055 208-056 208-057 API #: 50-029-23388-00-00 50-029-233$8-60-00 50-029-23388-64-00 50-029-23388-61-00 50-029-23388-62-00 50-029-23388-63-00 Top Perf MD: See 10-407's Bottom Perf MD: See 10-407's This well began Production on September 25, 2008 Method of Operations is: Gas Lift Date of Test: 09130/08 Hours Tested: 4 24-Hour Rate /Oil-Bbl: 2,254 24-Hour Rate /Gas-Mcf: 3,553 24-Hour Rate /Water-Bbl: 12 Test Rate /Oil-Bbl: 376 Test Rate IGas-Mcf: 592 Test Rate iWater-Libl: 2 Choke Size: 53 Gas-Oil Ration: 1,576 10/2/2008 . ia~,c~,vi~ Flow Tubing Pressure: 820 Casing Pressure: 1,260 Oil Gravity-AP1: Unavailable 10/2/2008 osi2sios r1 ~~ $Ch~lll~b~l'~~I' N0.4908 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well .Inh # 1 nn nncrriniinn n.,~.. e~ n_~_- 17-12 11978484 PRODUCTION PROFILE - 09/19/08 1 1 P2-27 12017505 PRODUCTION PROFILE ~ _ 09/08/08 1 1 18-05A 11999048 FREE POINT INDICATOR LOG 09/16/08 1 1 E-36 12034922 SCMT 09/13/08 1 1 06-13A 12066547 MEM PROD PROFILE 6(p- ~(~ 09/05/08 1 1 12-09 12083409 MEM DENSITY LOG ~ _ ( 09/06/08 1 1 13-14 11978482 PROD PROFILE ~~ - ~ 09/13/08 1 1 L-214A 11970843 INJECTION PROFILE C~-,~ ~ 09/05/08 1 1 L-210 12031511 INJECTION PROFILE 09/02/08 1 1 L-216 11970842 INJECTION PROFILE ~ _ 09/04/08 1 1 V-221 12034920 INJECTION PROFILE ~ 09/09/08 1 1 L-205L4 40016965 OH MWDlLWD EDIT 06/26/08 (2 PRINTS & 1 CD HAND DELIVERED SEPARATELY) ~~ • ••~•• ........................ ~. ..~.. .,. .a.aa.•n.aa ruw f1GI Vn19119V VnC VVfi CFiVfI I V: BP Exploration (Alaska) Inc. _ ... Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Sui 400 Anchorage, AK 9-2 8 - ATTN: Beth Received by. STATE OF ALASKA ~ ~ ~ ALASKA~L AND GAS CONSERVATION COM~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.,os zoAACZS.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ €xploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/8/2008 12. Permit to Drill Number 208-056 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/25/2008 13. API Number 50-029-23388-62-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/26/2008 14. Well Name and Number: L-205L4 2361 FSL, 3786 FEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon: 1306' FSL, 413' FEL, SEC. 33, T12N, R11 E, UM (OA) 8. KB (ft above MSL): 76.1' Ground (ft MSL): 47.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 1971' FNL, 4969' FEL, SEC. 03, T11N, R11E, UM 9. Plug Back Depth (MD+TVD) 8763' 4269' Schrader Bluff 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 583130 y- 5978082 Zone- ASP4 10. Total Depth (MD+TVD) 8763' 4269' 16. Property Designation: ADL 028241 TPI: x- 581237 y- 5977006 Zone- ASP4 Total Depth: x- 582004 y- 5973737 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 25.071): MWD / GR / RES / AZI Density / NEU /AIM / PWD /y/,j/QO~S/~ ~~?~f ~d ~~~ ~ ~~~ 22. CASING, LINER AND CEMENTING RECORD CASING -SETTING DEPTH MD° SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP $OTTOM SIZE CEMENTING RECORD PULLED 4-1/2" 12.6# L-80 4837 8752' 4202' 4269' 6-3/4" Uncemented Slotted Liner 4-1/2" 12.6# 13Cr80 4781' 4973' 4170' 4265' N/A Tieback Liner 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER .SET MD 4-1/2" Slotted Section 4-1l2", 12.6#, 13Cr80 4612' 4542' MD TVD MD TVD 5320' - 6898' 4264' - 4259' 7445' - 8709' 4249' - 4266' 2rj_' , ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. COM!'LETION None ~ DAT Form 10-407 ReVlsed 02/2007 ; CONTINUED ON REVERSE SIDE ~ ~~~ HUU ~ ~ Ztllld ~r~~a~ ~~~~~~~ 28. GEGIOGIC MARKERS (LIST ALL FORMATIONS AND ERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD WeIlTested. ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Schrader Bluff OA 4868' 4219' None Schrader Bluff OBa 5075' 4286' Schrader Bluff OBa 5186' 4287' Formation at Total Depth (Name): Schrader Bluff OA (Entered f/ Base) 5400' 4253' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ Og Q Signed Terrie Hubble Title Drilling Technologist Date L-205L4 208-056 Prepared By Name/Number Terrie Hubble, 564-4628 Well Number Permit No. / A rOVal NO. Drilling Engineer: SCOtt Kolstad, 564-5347 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP Page 1 of 1 Leak-Off Test Summary Legal Name: L-205 Common Name: L-205 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 5/3/2007 LOT 3,026.0 (ft) 2,739.0 (ft) 9.25 (ppg) 975 (psi) 2,291 (psi) 16.10 (ppg) 6/3/2008 LOT 5,611.0 (ft) 4,465.0 (ft) 9.30 (ppg) 520 (psi) 2,677 (psi) 11.54 (ppg) C~ Printed: 7/23!2008 2:28:40 PM BP Page 1 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/25/2008 06:00 - 10:30 4.50 MOB P PRE Release rig from L-220i ~ 0600. Back pit module off of sub unit and to edge of pad. Back Sub unit off of well and and to edge of pad. 10:30 - 00:00 13.50 MOB P PRE Perform rig maintenence while standing by on pad prep to be completed for L-205. Pad leveled, Gas Lift Lines removed from neighboring wells, well houses removed as necessary. 4/26/2008 00:00 - 07:00 7.00 MOB P PRE Spot line and install diverter on landing ring. Begin spotting rig mats around wellhead. 07:00 - 09:30 2.50 MOB P PRE Move and spot sub over well. 09:30 - 14:00 4.50 MOB P PRE Shim & level substructure. Set up Herculite berms around cellar and rig. 14:00 - 16:00 2.00 MOB P PRE Spot diverter lines into position and make up. 16:00 - 18:30 2.50 MOB P PRE Spot pit module into position. Spot Jumbo-Vac System and cuttings tank. Berm around pits. ACCEPT RIG -Rig accept rolled back to 25-Apr-2008 16:00 due to pad prep standby time and diverter installation. 18:30 - 23:00 4.50 RIGU P PRE Take on water for spud mud. Load pipeshed w/ 4" drillpipe and HWDP. 23:00 - 00:00 1.00 RIGU P PRE Load bulk system and begin mixing spud mud. Continue loading shed w/ DP and strapping pipe. 4/27/2008 00:00 - 03:00 3.00 RIGU P PRE Continue mixing spud mud. Nipple up drilling riser. Finish preparing to PU drillpipe. 03:00 - 06:30 3.50 RIGU P PRE PU 105 jts. 4" HT-40 drillpipe from pipeshed and rack back in derrick. 06:30 - 07:30 1.00 RIGU P PRE Pressure test surface equipment to 3500 psi,good test. 07:30 - 09:00 1.50 DRILL P SURF Pick up HWDP and stand back in derrick. -stage BHA components on pipeshed -bring stabilizers,bit,bit breaker, and UBHO sub to floor. 09:00 - 10:00 1.00 DRILL P SURF Service top drive and install safety cable to link tilt hydraulic cylinder. 10:00 - 10:30 0.50 DRILL P SURF Pick up stand wrars,tag bottom at 70',rack back in derrick. 10:30 - 11:00 0.50 DIVRTR P SURF Function test diverter system. Perform accumulator test. Witnessing of test waived by AOGCC rep Chuck Scheve. Witnessed by BP WSL Blair Neufeld & NAD TP Ronnie Dalton. 11:00 - 13:00 2.00 DRILL P SURF Make up 13-1/2" bit to HWDP to drill out conductor and formation to accomodate BHA makeup. "*Note: Langham Crew held Pre-Spud meeting during their Pre-Tour meeting. 13:00 - 16:00 3.00 DRILL P SURF Drill 13 1/2" hole to 312' md. 16:00 - 17:30 1.50 DRILL P SURF Break out bit and stand back HWDP. 17:30 - 22:30 5.00 DRILL P SURF Pick up and make up 13.5" directional BHA #1. Bit - MXL-1 X, 1.50 deg PDM. Orient motor with MW D. Tag up on fill at 247', Wash down to 276' md. 22:30 - 00:00 1.50 DRILL P SURF PJSM. Rig up Gyro Data and Sperry wireline unit. "Note: Stewart Crew held Pre-Spud meeting during their Pre-Tour meeting. 4/28/2008 00:00 - 12:00 12.00 DRILL P SURF Drill 13.5" surface hole from 312' to 1301'. -Started kick-off ~ 300'. Gyro survey every stand to 1206'. -570 gpm, 1930 psi on, 1520 psi off. 80 rpm, 8k TO on, 5-7.Ok TO off. -PU - 78k, SO - 70k, RT - 72k, WOB - 35k. -Cuttings load normal,gravel,sand and clays, no downhole losses. Printed: 8/6/2008 12:18:26 PM gp Page 2 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/28/2008 00:00 - 12:00 12.00 DRILL P SURF -vis 400+, mud weight in 9.2 ppg,mud weight out 9.4 ppg 12:00 - 16:30 4.50 DRILL P SURF Directionally drill 13 1/2" surface hole from 1,301' to 1,680' md. 560 gpm, 1,930 psi on, 1,520 psi off. 80 rpm, 8.Ok tq on, 2.1 k tq off. PU - 78k, SO - 70k, RWT - 72k, WOB - 5-35k. 16:30 - 17:30 1.00 DRILL P SURF Circulate bottoms up X 3 ~ 600 gpm, 1,758 psi, 100 rpm. 9.1 PP9 MW 17:30 - 18:30 1.00 DRILL P SURF Wiper trip from 1,680' to 256'. Pulled OK until 35k over from 1,050 - 1,000 & 835'. No other overpulls. 18:30 - 20:15 1.75 DRILL P SURF Run in hole from 256' to 1,680'. Work pipe down without pumps from 980 - 1,050' md. Slackoffs of up to 30k, but able to fall past slowly. 20:15 - 00:00 3.75 DRILL P SURF Directionally drill 13 1/2" surface hole from 1,680'to 2,061' md. 575 gpm, 2,010 psi on, 1,823 psi off. 80 rpm, 6-7k tq on, 3k tq off. PU - 85k, SO - 75k, RWT - 75k, WOB - 25-30k. AST - 8.72 hrs, ART - 2.57 hrs 4/29/2008 00:00 - 05:30 5.50 DRILL P SURF Directionally drill 13 1/2" surface hole from 2,061' - TD ~ 3,036' md. 700 gpm, 3,025 psi on, 2,800 psi off. 80 rpm, 7k TO on, 4k TO off PU - 108k, SO - 80k, RWT - 85k, WOB - 35k Hydrates breaking out at surface while drilling 2,000' - 2,200' and before tapering off. AST - 0.55 hrs, ART - 2.97 hrs 05:30 - 06:45 1.25 DRILL P SURF Rotate and reciprocate full stand while circlulating to clean up hole CBU x 3. 710 gpm, 3040 psi, 100 rpm, 4k TO. Shakers cleaned up to only minor cuttings returns after 2.5 bottoms up. Shut down, monitor well -Static w/ occasional hydrates breaking out. 06:45 - 07:30 0.75 DRILL P SURF Lay down single joint & POH 3 stands from 3,036' and to 2,707' md. Encounter 35k+ overpull with slight swabbing. PU - 115k, SO 75k. 07:30 - 08:30 1.00 DRILL P SURF Backream 8 stands out of hole to 1,946' and Qust below base permafrost ®80 rpm, 235 gpm, 2565 psi, RTW - 80k. 08:30 - 09:45 1.25 DRILL P SURF Attempt to pull one stand dry at 1,946' but well swabbing. Continue backreaming to 922' md. 09:45 - 10:30 0.75 DRILL P SURF RIH from 922' to TD ~ 3,036' md. Tag up TD on depth w/ no fill. PU - 110k, SO - 85k. No tight spots seen. 10:30 - 12:30 2.00 DRILL P SURF CBU x 2.5 ~ TD, reciprocating pipe full stand. 700 gpm, 3100 psi, 100 rpm, 4.Ok TO, RTW - 92k 12:30 - 15:00 2.50 DRILL P SURF Shut down, monitor well -static. MW in 9.5, MW out 9.5. Pull out of hole with 13.5" drilling BHA #1 from 3,036' to 1,004' md. Pulled 20k over at 1,870' and and 30k over at 1,315'. Otherwise, no more than 5-7k overpulls. 15:00 -17:30 2.50 DRILL P SURF PJSM. Lay down BHA #1. Stand back JAR stand. Bit grade: 1 -1 -SS-C-F-1-NO-TD. 17:30 - 19:30 2.00 DRILL P SURF Clean and clear rig floor of BHA equipment. 19:30 - 22:30 3.00 CASE P SURF PJSM. Make dummy run with 103/4" casing hanger and landing joint. Rig up to run casing. 22:30 - 00:00 1.50 CASE P SURF PJSM. Pick up and make up 103/4" 80' shoe track. Baker-Lok connections. Check floats - OK. 4/30/2008 00:00 - 09:30 9.50 CASE P SURF Check floats - OK. Continue running in hole with 103/4" 45.5# Printed: 8/8/2008 12:18:26 PM BP Page 3 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/30/2008 00:00 - 09:30 9.50 CASE P SURF L-80 BTC casing to -3026' md. Filled every joint with casing fill-up tool topping off every 10 joints. Make up TO - 9,500 ft/Ibs. Used BOL 2000 NM pipe lubricant. Circulate down every 5 or 10 joints as needed ~ 3 bpm, 470 psi to keep displacement good. Halliburton 10 3/4" Float Shoe Bottom ~ 3026'. 2 Jts 103/4" 45.5# L-80 BTC Casing (#1- #2) Halliburton 10 3/4" Float Collar ~ 2941'. 2 Jts 10 3/4" 45.5# L-80 BTC Casing (#3- #4) 69 Jts 10 3/4" 45.5# L-80 BTC Casing (#5- #73) 10 3/4" 45.5# Hanger Pup Jt Casing hanger 103/4" Landing Ring to Rotary table - 28.85' 09:30 - 10:30 1.00 CASE P SURF 10:30 - 12:30 2.00 CEMT P SURF 12:30 - 14:30 2.00 CEMT P SURF 14:30 - 15:30 1.00 CEMT P SURF 15:30 - 16:00 0.50 CEMT P SURF Up weight = i 60K, Down Weight = 110 Baker-Lock Shoe-track Jts #1-3 Bowsprings Centralizers: 1 on stop ring 5-10 ft. above shoe on jt #1 1 on stop ring 5-10 ft. above float collar 23 on collars on jts #3-25 25 Total Centralizers, 2 Stop Rings Laydown Frank's tool. Slowdown topdrive. Make up double plug cementing head. Stage pumps up to 300 gpm, 406 psi ICP incrementally. Continue circulating and conditioning mud to a 60 viscosity and 18 YP ~ 300 gpm, 305 psi prior to switching to Dowell. Reciprocated casing 12 ft strokes. PU - 175k, SO - 119k. Held cementing PJSM while circulating. Switch over to Dowell. Pump 5 bbls of water. Pressure test lines to 4,000 psi - OK. Pump 80 bbls of 10.0 ppg of MudPush II ~ 6.5 bpm, 180 psi ICP, 165 psi, FCP. Shut down and release bottom plug. Pump 468 bbls of 10.7 ppg DeepCrete lead cement ~ 6.5 bpm, 306 psi ICP, 336 psi FCP. Pump 83 bbls of 15.8 ppg Class "G" tail cement ~ 5.5 bpm, 485 psi ICP, 280 psi FCP. *Note: Spacer observed at surface with 16 bbls tail cement pumped. Drop top plug and chase with 5 bbls H2O. Full retums throughout cement pumping. Switch over to rig pumps and displace cement with total of 278 bbls 8.6 ppg seawater ~ 5 bpm, 112 psi ICP, 804 psi FCP. Reciprocated pipe in 15' strokes until 175 bbls into displacement. Landed casing on ring due to low slack off weight. PU - 180k, SO - 75k prior to landing casing. Slow pump to 3 bpm 10 bbls prior to bumping plug, 695 psi ICP, 750 psi FCP. Bumped plug ~ 3,918 strokes (96.6% efc) with 3,500 psi. CIP ~ 15:31 hr. Returned 172 bbls of "Sidewalk Cement". Full returns throughout job. Pressure up to 3500 psi for casing test. After 20 minutes, pressure bled down to 3,185 psi. Shut in and isolate any possible surface equipment. Pump 0.26 bbl to repressure to 3500 psi. Bled down 116 psi in 7 minutes. Bleed off pressure and check floats. Printed: 8/6/2008 12:18:26 PM gp Page 4 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/30/2008 16:00 - 19:30 3.50 CASE P SURF Laydown landing joint. Flush flowline and riser. Rig down casing and cementing equipment. Start nipple down of diverter lines. Clean out from under rotary table. 19:30 - 23:00 3.50 WHSUR P SURF Nipple down diverter riser and change out drilling nipple adapter from 20" to 16". Move surface hydril off of conductor and chain up in cellar. 23:00 - 00:00 1.00 WHSUR P SURF Bring casing head and tubing spool into cellar and nipple up same. Test metal to metal seals to 1,000 psi - 10 min - OK. 5/1/2008 00:00 - 04:30 4.50 BOPSU P SURF Nipple up BOPE. 04:30 - 13:30 9.00 CEMT P SURF Continue to clean pits in preparation for MOBM. clean cement out of flowline. Clear out from under drawworks. Load pippe shed w/ DP and strap same. 13:30 - 15:00 1.50 BOPSU P SURF Rig up to test BOPE. Install test plug w/ 4" test joint. 15:00 - 22:00 7.00 BOPSU P SURF Pressure test ROPE to 250 psU3,500 psi for 5 min each test. 250 psi/2,500 psi on annular preventer for 5 min each. Perform Accumulator test. Test witnessed by BP WSLs M. Martyn, J. LeBlanc, & NAD TPs R. Dalton, G. Hoffman. AOGCC rep. John Crisp waived witness of test. 22:00 - 23:00 1.00 BOPSU P SURF RD from BOP testing. LD test joint. Install 9.9" ID wear bushing. 23:00 - 00:00 1.00 CASE P SURF Close blinds and pressure up on 10-3/4" casing for pressure ', test. Held 2000 psi for 5 minutes before bringing pressure up to 3500 psi. Good test. Only lost 30 psi during test. '5/2/2008 00:00 - 01:00 1.00 DRILL P INT1 MU BHA #2 - 9-7/8" MXL-1X milltooth bit, NB Stab, DC, Stab, tea DC, Jars. 01:00 - 02:30 1.50 DRILL P INT1 RIH on drilipipe to 2,728' md. 02:30 - 03:00 0.50 DRILL P INT1 Transfer remaining stands from off drillers side rack into drillers side rack to enable access to steam table for cleaning. 03:00 - 03:15 0.25 DRILL P INT1 Wash down and tag up on top of cement ~ 2,919' md. Slack off 10k to confirm. 03:15 - 03:45 0.50 DRILL P INT1 CBU x 1.5 to flush wellbore. 718 gpm, 2090 psi. 03:45 - 04:30 0.75 DRILL P INT1 Clean out from under off-driller side pipe rack. 04:30 - 06:00 1.50 DRILL P INT1 Cut and slip drilling line. Service topdrive and crown. 06:00 - 09:00 3.00 DRILL N WAIT INT7 Mud planned for 9ES was sent to Doyon 15 due to a well control incident, wait on mud from mud plant. 09:00 - 13:30 4.50 DRILL N WAIT INT1 Waiting on mud from mud plant to arrive. Truck with mud broke down enroute. 13:30 - 15:30 2.00 DRILL P INTi Take on MOBM into rig pit system. Pump 50 bbls used Versapro LS viscosified OBM spacer. Chase with new 9.3 ppg. MOBM ®7 BPM with 580 PSI. 15:30 - 16:15 0.75 DRILL P INT1 Drill cement from cement top at 2,922' through float collar and shoe found on depth at 2,940' & 3,026' and clean out rathole to 3,036' md. 450 gpm, 1360 psi, 80 rpm, 3-4k TO on, 25-30k WOB. 16:15 - 17:30 1.25 DRILL P INT1 CBU x 2.5 while rotating and reciprocating. 140 rpm, 690 gpm, 2800 psi, 2k TQ off, PU - 95k, SO - 80k, RTW - 87k. 17:30 - 19:00 1.50 DRILL P INT1 Shut down monitor well -static. MW in 9.3 ppg, MW out 9.3 ppg. POH from 3,036' to top of BHA ~ 208' 19:00 - 20:15 1.25 DRILL P INT1 Lay down or rack back BHA #2 components as appropriate. Bit grade 0 - 0 - WT - A - E - I - NO -BHA. (Still had paint on it) 20:15 - 21:30 1.25 DRILL P INT1 PJSM w/ rig hands and coring personel. Perform practice run with core barrel handling joint. Lay down empty handling joint Printetl: 8/6/2008 12:16:26 PM ~ ~ BP Page 5 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations 5/2/2008 20:15 - 21:30 1.25 DRILL P INT1 to pipeshed 4 times while adjusting operations to ensure smooth handling from rig floor to pipe shed. Practice went well, ready for game time. 21:30 - 00:00 2.50 DRILL P INTi Begin making up BHA #3 - 8-1/2" MXL-1X milltooth bit, Powerdrive Rotary Steerable, ARC, MWD, NM-DC, NM Stab, tea NM DC. 5/3/2008 00:00 - 00:30 0.50 DRILL P INT1 Finish making up BHA #3 - 8-1/2" MXL-1X milltooth bit, Powerdrive Rotary Steerable, ARC, MWD, NM-DC, NM Stab, tea NM DC, CCV, Jars. Test powerdrive RSS - OK. 00:30 - 01:30 1.00 DRILL P INT1 RIH w/ BHA #3 to 1,031. Install ghost reamer. 01:30 - 02:00 0.50 DRILL P INT1 Shallow test MWD - 500 gpm, 1442 psi. 02:00 - 04:30 2.50 DRILL P INT1 RIH on 4" HT-40 DP 1x1 from pipeshed to 3,030' md. 04:30 - 05:00 0.50 DRILL P INT1 Perform ECD Baseline test 504 gpm, 2180 psi - ~ 0 rpm, CECD = 9.45, AECD = 9.54, correction factor -0.09, ®120 rpm CECD = 9.45, AECD = 9.56, correction factor = -0.11 05:00 - 05:30 0.50 DRILL P INT1 Directionally drill 20' of new hole to 3,056' md. 501 gpm, 2,147 psi on, 2,098 psi off. 133 rpm, 3.8k tq on, 2.9k tq off. PU - 104k, SO - 88k, RWT - 75k, WOB - 10k. 05:30 - 06:00 0.50 DRILL P INTi CBU while rotating 135 rpm, & reciprocating 30'. 498 gpm, 2114 psi, 3.Ok TO. 06:00 - 06:30 0.50 DRILL P INT1 Pull back to casing shoe at 3,026' and and perform LOT to 16.10 ppg. Leakoff pressure = 975 psi, mud weight 9.25 ppg, TVD - 2,739'. 06:30 - 11:45 5.25 DRILL P INT1 Directionally drill 8.5" hole from 3,056' and to 3,287' md. 510 gpm, 2,170 psi on, 2,200 psi off. 140 rpm, 3.5k tq on, 3.Ok tq off. PU - 105k, SO - 83k, RWT - 95k, WOB - 5-10k. CECD - 9.35 ppg, AECD - 9.56 ppg, ART - 4.1 hrs 11:45 - 12:30 0.75 DRILL P INT1 CBU not rotating but reciprocating 80'. 445 gpm, 1555 psi. PU - 105k, SO - 85k. 12:30 - 12:45 0.25 DRILL P INT1 Monitor well -static. MW in = 9.3 ppg, MW out = 9.3 ppg, Pump dry job. 12:45 - 15:00 2.25 DRILL P INT1 Not achieving necessary doglegs. POH for BHA from 3,270' to 257' md. 15:00 - 17:00 2.00 DRILL P INT1 LD 8-1/2" Rotary Steerable BHA #3. Bit grade 0 - 0 - NO - A - E-I-NO-BHA. 17:00 - 20:00 3.00 DRILL P INT1 Make up BHA #4 - 9-7/8" MXL-1 X RR milltooth bit, 1.5 deg PDM, ARC, MWD, NM-DC, NM Stab, tea NM DC, 8.5" reamer, CCV, Jars. 20:00 - 21:30 1.50 DRILL P INTi RIH w/ BHA #4 to 1,032'. Install 9.875" ghost reamer. Shallow test MWD - 500 gpm, 1277 psi. 21:30 - 00:00 2.50 DRILL P INT1 Continue RIH w/ BHA #4 to 3,025' md. Establish parameters. 5/4/2008 00:00 - 02:00 2.00 DRILL P INT1 Ream down in 8.5" open hole from 3,036' to 3,287' md. 2-7k WOB, 540 gpm, 2349 psi, 60 rpm, 3.7k TO. 02:00 - 08:00 6.00 DRILL P INTi Directionally drill 9.875" hole from 3,287' and to 3,709' md. 550 gpm, 2,391 psi on, 2,280 psi off. 60 rpm, 3-5k tq on, 3-4k tq off. PU - 110k, SO - 90k, RWT - 100k, WOB - 3-20k. 08:00 - 09:00 1.00 DRILL P INTi Ream last stand at 60 rpm & 3.5-5k TO to work out high dogleg. Worked down to 7.93 deg/100. 09:00 - 12:00 3.00 DRILL P INT1 Directionally drill 9.875" hole from 3,541' to 3,891' md. 600 gpm, 2,860 psi on, 2,770 psi off. Printed: 8/62008 12:18:26 PM ~ ~ BP Operations Summary Report Page 6 of 18 ~ Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/4/2008 09:00 - 12:00 3.00 DRILL P INTi 60 rpm, 4-6k tq on, 4k tq off. PU - 120k, SO - 95k, RWT - 105k, WOB - 5-20k. CECD - 9.28ppg, AECD - 9.47ppg 10:30 -Started taking -7bph losses ~ -3,800' which slowly healed up and stopped by 15:00. 24 bbls lost total. 12:00 - 00:00 12.00 DRILL P INTi Directionally drill 9.875" hole from 3,891' to 4,340' md. 650 gpm, 3,418 psi on, 3,240 psi off. 60 rpm, 5-6k tq on, 5k tq off. PU - 130k, SO - 95k, RWT - 110k, WOB - 10-20k. CECD - 9.21 ppg, AECD - 9.61 ppg Ream stands as necessary to reduce high doglegs if encountered. AST - 7.72 hrs, ART - 2.22 hrs 5/5/2008 00:00 - 01:00 1.00 DRILL P INTi CBU x 2.5 ~ 650 gpm, 3,360 psi, 60 rpm, 5.5k TO. 01:00 - 04:00 3.00 DRILL P INT1 Shut down, monitor well -static. MW in 9.1, MW out 9.1, Pull 1 stand w/o overpull. Pump dry job. POH from TD ~ 4,430' and to top of BHA ~ 295' md. No more than 5k overpulls on trip out. 04:00 - 08:00 4.00 DRILL P INTi Lay down BHA #4 - LWD tools need to be Isid down to shed for re-programming while breaking apart lower BHA. Bit grade - 1 -3-WT-A-E-1 -FC-BHA. 08:00 - 09:30 1.50 DRILL P INT1 MU 8.5" BHA #5 - 8.5" MXL-iX, Powerdrive Rotary Steerable, ', ARC6, MWD. 09:30 - 12:00 2.50 DRILL N DFAL INT1 Attempt to function test rotary steerable. Unable. Lay down ', powerdrive & ARC and change out to backup tools. 12:00 - 13:30 1.50 DRILL P INT1 Function test new Powerdrive and ARC - OK. MU remaining BHA - NM Stab, tea DC, 8.5" Reamer, NM DC, Jars, 9.875" reamer. 13:30 - 16:30 3.00 DRILL P INT1 RIH w/ BHA #5 to 4,340. Wash down last stand to bottom & Tag up on depth - no fill. 16:30 - 17:30 1.00 DRILL P INT1 Directionally drill 8.5" hole from 4,340' to 4,360' md. 500 gpm, 2,781 psi on, 2,683 psi off. 120 rpm, 4k tq on, 3k tq off. PU - 135k, SO - 95k, RWT - 115k. CECD - 9.28 ppg, AECD - 9.47 ppg 17:30 - 18:30 1.00 DRILL P INT1 Shut down pump 2. Pulsation dampener leak into pump room. Troubleshoot & isolate pump 2 dampener. 18:30 - 19:30 1.00 DRILL P INT1 Directionally drill 8.5" hole from 4,360' to 4,420' md. 500 gpm, 2,781 psi on, 2,683 psi off. 120 rpm, 4k tq on, 3k tq off. PU - 135k, SO - 95k, RWT - 115k. CECD - 9.28 ppg, AECD - 9.47 ppg 19:30 - 20:30 1.00 DRILL P INT1 Take on 10.7ppg VersaCore mud to pits in preparation for mud swap. 20:30 - 21:30 1.00 DRILL P INT1 Displace over from to 10.7 ppg VersaCore mud. Pump DP volume at 400 gpm and reduce rate to 250 gpm while mud moving up annulus to minimize ECD's on formation. 21:30 - 22:30 1.00 DRILL P INTi Stage up pumps in 1 BPM increments from 3 BPM watching for losses. Only slight losses below 6 BPM and increasing to nearly 40 bph while pumping at drilling rate of 450 gpm. 22:30 - 00:00 1.50 DRILL P INTi Directionally drill 8.5" hole from 4,420' to 4,460' md. 420 gpm, 2,273 psi on, 2,100 psi off. 120 rpm, 3-4k tq on, 3k tq off. Punted: 8/6/2pOS 1z:18:z6 PM • s BP Page 7 of 18 Operations. Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations 15/5/2008 122:30 - 00:00 I 1.501 DRILL P I INT1 5/6/2008 00:00 - 00:30 0.50 DRILL P INTi 00:30 - 01:30 1.00 DRILL P INT1 01:30 - 02:00 0.50 DRILL P INT1 02:00 - 05:00 3.00 DRILL P INT1 05:00 - 07:30 2.50 DRILL P INT1 07:30 - 09:00 1.50 DRILL P INT1 09:00 - 10:30 1.50 EVAL P INT1 10:30 - 15:00 4.50 EVAL P INTi 15:00 - 16:30 1.50 EVAL P INT1 16:30 - 19:00 2.50 EVAL N WAIT INT1 19:00 - 20:30 1.50 EVAL P INT1 20:30 - 22:15 1.75 EVAL P INT1 22:15 - 23:00 0.75 EVAL P INT1 23:00 - 23:30 0.50 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INTi 5/7/2008 00:00 - 01:30 1.50 EVAL P INT1 01:30 - 02:00 I 0.501 EVAL I P I I INT1 02:00 - 12:30 I 10.501 EVAL I P I INT1 12:30 - 14:30 2.00 EVAL P INT1 14:30 - 17:30 3.00 EVAL P INTi PU - 135k, SO - 95k, RWT - 115k. CECD - 10.54 ppg, AECD - 10.78 ppg Losses slacked off to 3-4 bph after getting drilled solids into wellbore. Directional) Drill 8.5" hole from 4,460' to 4,475' and pausing to look at logs as required. Circulate bottoms up ®380 gpm. Only lost 3 bbls to formation while circulating. Shut down, monitor well -static. MW in 10.5, MW out - 10.5. Attempt to POH dry. Pulled 20k over and swabbing. Backream 2 stands out of hole to 4,340' and (9-7/8" hole). Pulling dry after that. only 5k overpulls. LD BHA #5 racking back collar stand and jar stand. Bit grade - 0-0-NO-A-E-I-NO-BHA. Clean and clear rig floor of all BHA components and handling tools. PJSM w/ Baker hands and all rig hands. Prepare tools for MU Baker M-Sand coring BHA. MU Baker coring BHA -Coring Bit, Stabalizer, 30' core barrel, Stabalizer, 30' core barrel, Stabalizer, Float Sub, Circ Sub, 4 stands 4" HWDP, Jars, 4 stands 4" HWDP. RIH w/ M-Sand coring BHA to 3,000' Circulate and condition mud w/ BHA inside casing shoe while coordinating transportation for coring personal due to inclement weather conditions. Service top drive. RIH from casing shoe to 4,424' on stands of DP. MU last stand and precautionary wash to bottom 125 gpm, 15 rpm. RTW - 100k. Tag up ~ 4,474.6' md. Stand back last stand. Insert 2 ea spaceout DP pups - 4.87' & 14.97' and single joint. PU - 115k, SO - 90k Drop ball, circulate down, and begin coring operations. Core from 4,475' to 4,496' md. 180 gpm, 907 psi, 60 rpm, 3.7k TO. Continue coring operations. Core from 4,496' - 4,503' md. 180 gpm, 907 psi, 60 rpm, 3.7k TO. at 4,503' md, torque dropped off to -2.7k and ROP stopped. Gradually increase weight on bit from 5k up to as much as 15k. No torque response. Drop ball and pump down to shear core. Pull gradually up to 80k over in first 20' off of bottom before weight broke back over. Pull 30k over ~ 4,430 & 40k over at 4,410'. Take slow pump rates & Begin POH following pulling schedule. POH w/ M-Sand coring BHA from 4,506' to 2,335' md. 3-minutes per stand from TD to 3,763', 6-minutes per stand from 3,763' to 2,622', 9-minutes per stand from 2,622' to 1,577'. 12-minutes per stand from 1,577' to 538'. 15-minutes per stand from 538' to 75' and -(Top of BHA)'. No overpulls while POH. Break out top portions of coring BHA, break out bit and remove split ring. MU bit &RIH to top sub. Set slips & dog collar. Remove inner core barrel and lay down to pipeshed in core shuttle. MU new core barrel assembly and install into coring Printed: 8/6/2008 12:18:26 PM ~ ~ BP Operations Summary Report Page 8 of 18 ~ Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/7/2008 14:30 - 17:30 3.00 EVAL P tNT1 BHA. Make up remainder of coring BHA. 17:30 - 19:30 2.00 EVAL P INT1 RIH w/ M-Sand coring assembly number 2 from top BHA to 2,995' inside casing shoe. 19:30 - 20:30 1.00 EVAL P INT1 CBU -stage up pumps tp 130 gpm. ICP 410 psi, FCP 380 psi. 20:30 - 21:45 1.25 EVAL P INT1 RIH to 4,425' and w/ M-Sand BHA #2 21:45 - 22:15 0.50 EVAL P INT1 Start taking weight ®-4,425' md. MU blower hose and screw into pipe. Take parameters. Pumps off PU - 115k, SO - 80k. Pumps on PU - 110k, SO - 90k, RTW - 100k. 22:15 - 23:00 0.75 EVAL P INT1 Wash down 200 gpm, 730 psi, 20 rpm, 3k TQ. Saw Torque increase 500-1000 ft-Ibs ~ -4,410' and and stay there until -4,440' md. Tag up on depth ®4,503' md. 23:00 - 23:30 0.50 EVAL P INT1 Lay down single joint, MU 'kelly stand'. 23:30 - 00:00 0.50 EVAL P INT1 Wash down and begin coring operations. Core from 4,503' and to 4,514' md. 200 gpm, 1000 psi on, 750 psi off 50 rpm, 3.8k TO on, 3.Ok TO off PU - 110k, SO - 90k, RTW - 100k, WOB - 0-5k 5/8/2008 00:00 - 00:45 0.75 EVAL P INTi Continue coring operations. Core from 4,514' and to 4,535' md. 200 gpm, 1000 psi on, 750 psi off 50 rpm, 3.8-4.3k TO on, 3.Ok TO off PU - 110k, SO - 90k, RTW - 100k, WOB - 0-5k 00:45 - 01:00 0.25 EVAL P INT1 Drop ball from drop ball sub, pump down ~ 200 gpm. Pressure went to 1300 psi after landed. PU to first tool joint, break and drop dart for circ sub. Pressure fell off from 1320 psi to 580 psi ~ 200 gpm. 01:00 - 02:00 1.00 EVAL P INT1 Circulate bottoms up through circ sub ®400 gpm, 1830 psi. No losses during circulation after pumps up to speed. Pump dry job. Blow down topdrive. 02:00 - 03:00 1.00 EVAL P INT1 POH to 4,473' md. PU - 125k. Pull tight ~ 4,473' and bit depth - 4,405' and top stabalizer depth. Pull 40k over and pipe moving slowly. Work pipe slowly up to 4,412' bit depth before getting back to normal upweight of 120k. 03:00 - 07:30 4.50 EVAL P INT1 POH w/ M-Sand coring BHA #2 from 4,412' to 538' md. 1.5-minutes per stand from TD to 2,812', 3-minutes per stand from 2,812' to 816', 6-minutes per stand from 816' to 259'. 12-minutes per stand from 259' to 167'. 24-minutes per stand from 167' -surface. No other overpulls while POH. 07:30 - 10:00 2.50 EVAL P INT1 Break out top portions of coring BHA, break out bit and remove split ring. MU bit &RIH to top sub. Set slips & dog collar. Remove inner core barrel and lay down to pipeshed in core shuttle. 10:00 - 13:30 3.50 EVAL P INT1 Install new core barrells into coring BHA in preparation for Core run #3 and rack back in derrick. 13:30 - 16:00 2.50 EVAL P INTi MU hole opening BHA - 8.5" millltooth bit, NB Stab, 8.5" ghost reamer, tea NM DC, 9.875" ghost reamer, CCV, Jars. 16:00 - 18:45 2.75 EVAL P INT1 RIH dry with BHA to 4,341' md. 19:30 - 20:30 1.00 EVAL P INTi Taking 5 - 10k weight ~ 4,341' md. Screw in and ream down from 4,341' - 4,414' md. Tag top of 8.5" hole with 9.875" reamer when bit ~ 4,414' Ream down from 4,414' - 4,426' and ~ -15fph BOP. PU - 110k, SO - 80k, RTW - 102k. rnntea: tuwtuua ie:its:eorm ~ ~ BP Page 9 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/8/2008 19:30 - 20:30 1.00 EVAL P INTi 320 gpm, 1300 psi, 120 rpm, 3.6k TO off, 2-12k TO on. 20:30 - 21:30 1.00 EVAL P INT1 Torque fell off and went to 3.7k while increasing bit weight without further gain in ROP. Pick up off bottom, circulate and reciprocate. Consult with town engineer. Decide to trip for hole opener. 21:30 - 00:00 2.50 EVAL P INT1 POH with BHA from 4,414' to 1,462' md. 5/9/2008 00:00 - 01:30 1.50 EVAL P INT1 POH w/ cleanout BHA to 140' md. 01:30 - 02:30 1.00 EVAL P INT1 LD 9-7/8" ghost reamer & 8-1/2" bit BHA. BHA in gauge. 02:30 - 04:00 1.50 EVAL P INT1 MU hole opener BHA - 9-7/8" bull nose hole opener, NB Stab, tea NM DC, 04:00 - 05:30 1.50 EVAL P INT1 RIH w/ BHA #9 to 3,035' md. 05:30 - 06:00 0.50 EVAL P INT1 Circulate 100 bbls to roll mud. Stage pumps up to 406 gpm, 1520 psi. 06:00 - 07:00 1.00 EVAL P INT1- flun in hole with 9 7/8" hole opener assembly from 3035' to 4253'. 07:00 - 07:30 0.50 EVAL P INT1 Break circulation & wash from 4253' to 4355',300 GPM ~ 1080 psi. 07:30 - 08:30 1.00 EVAL P INT1 Open hole from 8 1/2" to 9 7/8", 4355' to 4455'. -570 GPM X3340 psi -Torque off bottom 3k on bottom 4-6k -Up wt. 110k,down wt 85k, rotating wt 105k -Mud wt. in and out 106 ppg 08:30 - 09:00 0.50 EVAL P INT1 Circulate 1/2 bottoms up strokes 570 GPM ~ 3250 psi. -Rack back stand and record slow pump rates. -Monitor well static. 09:00 - 12:30 3.50 EVAL P INT1 POOH from 4427' to surface, Mud wt in and out 10.6 ppg. 12:30 - 14:00 1.50 EVAL P INT1 Lay down hole opener and make up 8 1/2" bit. -Run in hole to 3015' 14:00 - 15:00 1.00 EVAL P INTi Cut and slip 104' of drilling line. 15:00 - 16:00 1.00 EVAL P INT1 Service top drive -Grease & inspect drawworks. -Service Crown. 16:00 - 16:30 0.50 EVAL P INT1 Stage pumps up to 600 GPM ~ 2600 psi to shear mud in hole. -Circulate 160 bbls. 16:30 - 17:30 1.00 EVAL P INT1 Run in hole from 3015' to 4467'. 17:30 - 18:00 0.50 EVAL P INT1 Wash to bottom from 4467' to 4535'. -385 GPM ~ 1780 psi -Final -40' required rotary to wash down. 18:00 - 19:30 1.50 EVAL P INT1 Pull back into 9 7/8" hole and circulate bottoms up. -425 GPM ~ 1970 psi. Monitor well,static Mud wt in and out 10.7 ppg. 19:30 - 20:30 1.00 EVAL P INT1 POH from 4437' to 2920'. Hole taking correct displacement. 20:30 - 21:00 0.50 EVAL P INTi Pump dry job and blow down surface equipment. 21:00 - 22:30 1.50 EVAL P INTi POH from 2920' to 919'. Hole taking correct displacement.. 22:30 - 00:00 1.50 EVAL P INT1 Rack back BHA. 5/10/2008 00:00 - 00:30 0.50 EVAL P INT1 Clean rig floor after pulling out of hole. 00:30 - 03:00 2.50 EVAL P INT1 Run in hole with Core assembly #3 to 3303'. 03:00 - 04:00 1.00 EVAL P INT1 Circulate bottoms up at shoe, 200 GPM ~ 575 psi 04:00 - 05:00 1.00 EVAL P INTi Run in hole from 3303' to 4400'. 05:00 - 06:00 1.00 EVAL P INT1 Break circulation,wash to bottom. -Pull back and rack back stand. -Drop ball Printed: 8/6/2008 12:18:26 PM ~ ~ gp Page 10 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations ~ 5/10/2008 ~ 05:00 - 06:00 ~ 1.00 ~ EVAL ~ P ~ ~ INT1 06:00 - 08:00 2.001 EVAL I P I I INTi 08:00 - 19:00 I 11.001 EVAL I P I I INTi 19:00 - 19:30 0.50 EVAL P INT1 19:30 - 22:30 3.00 EVAL P INT1 22:30 - 23:00 0.50 EVAL P INT1 23:00 - 00:00 1.00 EVAL P INT1 5/11/2008 00:00 - 02:00 2.00 EVAL P INT1 02:00 - 03:00 1.00 EVAL P INT1 03:00 - 05:00 2.00 EVAL P INTi 05:00 - 05:30 0.50 EVAL P INT1 05:30 - 06:30 1.00 EVAL P INT1 06:30 - 08:00 1.50 EVAL P INT1 08:00 - 10:30 2.50 EVAL P INT1 10:30 - 12:30 2.00 EVAL P INT1 12:30 - 14:00 I 1.501 EVAL I P I INT1 14:00 - 19:30 I 5.50 EVAL I P I INT1 19:30 - 22:30 ~ 3.00 ~ EVAL ~ P ~ ~ INT1 -Pick up 15' space out pup and Kelly stand. -Pump ball to seat -Record slow pump rates. Core 60' from 4535' to 4595' -WOB 3k, RPM 50, Torque off bottom 3k,on bottom 4-5k -200 GPM G~ 900 psi -Drop ball and pump to seat 200 GPM ~ 800 psi. -Pressure up to 1420 psi to activate catcher. Rack back kelly stand and lay down 15' pup joint. -Pump dry job -Monitor well,static. -Mud wt in and out 10.8 ppg. -POH as per tripping schedule to 76' Clean rig floor. PJSM with crews and coring personnel on recovering core. -Break out bit and remove split ring. -Remove innner barrel. -Split innner barrel and lay down w/skate into pipeshed. Clean floor of coring fluid. Make up core barrel for run #4. -Make up additional 30' barrel. -Insert innner barrel. Make up core #4 BHA to 90'. Clear and clean rig floor prior to run in hole. Run in hole with coring assembly to 3025'. Circulate 140 bbls at the shoe, 250 GPM 4~ 780 psi Run in hole with coring assembly 3025' to 4454' Break circulation,wash to bottom ®4595'. -Rack back stand,pick up 15' space-out pup. Drop ball & pump to seat, 200 GPM ~ 1050 psi. -Pressure up to activate coring assembly. -Cut Core #4 50 RPM,3k torque off bottom,4-6k on bottom. -200 GPM G~1050 psi, WOB 5-10k. -Drop ball, pump down, 1,660 psi to activate core catcher. -Up wt 110k,down wt 85k,rotating wt 100k -Mud wt in and out 10.8 ppg. POH from 4675' 4359'. -Pull 80k over ~ 4589' -Backream from 4595' to 4359' -200 GPM ~ 1480 psi. 25 RPM. Drop dart & pump to seat to open circulating sub,155 GPM G~ 1120 psi. -Stage pumps up to 625 GPM ~ 3525 psi -Circulate bottoms up -Monitor well,static -Mud wt in and out 10.8 ppg. -Pump dry job,remove blower hose. POH from 4359' to 105' -Break out circ. sub and retrieve dart. -Clean floor of oil base coring fluid. Break out bit and remove split ring. -Make up bit and run back in to top sub. -Remove innner barrel and lay down to pipeshed. rnrnea: wacwa is io:co rm ~ ~ BP Page 11 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase ` Description of Operations 5/11/2008 19:30 - 22:30 3.00 EVAL P INT1 22:30 - 23:30 1.00 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INT1 5/12/2008 00:00 - 02:30 2.50 EVAL P INT1 02:30 - 03:00 0.50 EVAL P INT1 03:00 - 04:00 1.00 EVAL P INT1 04:00 - 04:30 0.50 EVAL P INT1 04:30 - 06:00 1.50 EVAL P INT1 06:00 - 08:00 ~ 2.00 I EVAL ~ P I ~ INTi 08:00 - 10:00 I 2.001 EVAL P INTi 10:00 - 15:30 5.50 EVAL P INT1 15:30 - 18:00 2.50 EVAL P INT1 18:00 - 19:00 1.00 EVAL P INTi 19:00 - 19:30 0.50 EVAL P INT1 19:30 - 22:00 2.50 EVAL P INT1 22:00 - 23:00 1.00 EVAL P INT1 23:00 - 00:00 1.00 EVAL P INT1 5/13/2008 00:00 - 01:00 1.00 EVAL P INTi 01:00 - 02:00 1.00 EVAL P INT1 02:00 - 03:30 1.50 EVAL P INT1 03:30 - 04:00 0.501 EVAL I P I I INT1 -Break and lay down 30' of outer barrel. Make up innner barrel and bit. Clean and clear rig floor prior to running in with core #5. Run in hole from 79' to 3006' -Up wt 87k down wt 75k Service top drive Break circulation stage pumps to 200 GPM ~ 570 psi. -Hole took 13 bbl loss prior to circulating. -Losses while circulating 1/2 bbl per hour. Run in hole with coring assembly 3006' to 4517'. Break circulation,wash to bottom ~ 4675'. -Rack back stand,pick up single & 5' space-out pup. Drop ball to divert from inner barrel to outer barrel, pressure increase from 760 psi to 940 psi. -Record slow pump rates -Core from 4674' to 4734'. -Up wt 120k,down wt 90k,rotating wt 105k. -200 GPM ~ 1030 psi off bottom,1170 psi on bottom. -WOB 3-5k,torque 3k off bottom & 4-5k on bottom. Mud wt in and out 10.7 ppg, Vis = 170. Drop ball to activate catcher. -Pump to seat at 180 GPM ~ 890 psi. -Pressure up to 1300 psi. -Back ream from 4734' to 4423' -Open circ sub,pump dry job. POH as per tripping schedule 4423' to 76'. PJSM with core Iab,Baker coring and crews. -Retrieve ball,change out circ. sub. -Break out bit,remove split ring. -Install core cap and run in to top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. - Run into 70'. Clean and clear rig floor. Run in hole from 70' to 3002'. Circulate at shoe. -Stage pumps up to 250 GPM ~ 700 psi. -No losses. Service top drive. Run in hole from 3002' to 4612' Wash to bottom ®4735' -200 GPM ~ 850 psi -No space out pups required,drop ball. -Pump ball to seat 200 psi pressure increase. -Record slow pump rates Core (#6) from 4735' to 4795'. -PU - 117k, SO - 94k, RWT - 105k. -200 GPM ~ 990 psi off bottom 1120 psi on bottom -WOB 3-6k, 50 RPM, Torque off bottom 3k on bottom 4-6k -Mud wt in and out 10.6 ppg. Drop ball and pump on to seat. -200 GPM ~ 960 psi, pressured up to 1440 psi to activate rnmea: awcwo is ~o:co rm gp Page 12 of18j Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/13/2008 03:30 - 04:00 0.50 EVAL P INT1 04:00 - 05:30 1.50 EVAL P INT1 05:30 - 06:00 0.50 EVAL P INT1 06:00 - 11:00 5.00 EVAL P INT1 11:00 - 13:30 2.50 EVAL P INT1 13:30 - 14:30 1.001 EVAL I P I I INT1 14:30 - 15:00 0.50 EVAL P INT1 15:00 - 16:30 1.50 EVAL P INT1 16:30 - 17:30 1.00 EVAL P tNT1 17:30 - 18:00 0.50 EVAL P INT1 18:00 - 20:00 2.00 EVAL P INT1 20:00 - 21:30 1.50 EVAL P INTi 21:30 - 23:00 I 1.501 EVAL I P I I INT1 23:00 - 23:30 I 0.501 EVAL I P I I INT1 23:30 - 00:00 I 0.501 EVAL P I I INT1 5/14/2008 100:00 - 01:00 I 1.001 EVAL I P I I INT1 01:00 - 01:30 I 0.50 I EVAL I P I I INTi 01:30 - 06:00 4.50 EVAL P INTi 06:00 - 08:30 2.50 EVAL P INT1 catcher. POH backreaming from 4795' to 4423' -200 GPM ~ 1560 psi, 25 RPM ~ 3-4 k torque. -No overpull -Open circ sub and pump out one stand,450 GPM ~ 2200 psi. Pump dry job -Blow down top drive,remove blower hose. POH as per tripping schedule 4423' to 76'. PJSM with core Iab,Baker coring and crews. -Retrieve ball,change out circ. sub. -Break out bit,remove split ring. -Install core cap and run in to top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. - Run in to 76'. Clean and clear rig floor. Run in hole from 76' to 3002'. -Up wt 80k down wt 68k Circulate at shoe. -Stage pumps up to 250 GPM ~ 725 psi. Service top drive. Run in hole from 3002' to 4613'. Wash to bottom ~ 4795' -180 GPM ~ 800 psi -Rack back stand, PU 2 singles required for space out, drop ball. -Pump ball to seat 200 psi pressure increase. -Record slow pump rates Core (#7) from 4795' to 4855'. -PU - 122k, SO - 93k, RWT - 105k. -200 GPM ~ 990 psi off bottom 1120 psi on bottom -WOB 4-6k, 50 RPM, Torque off bottom 3k on bottom 4-6k -Mud wt in and out 10.6 ppg. Drop ball and pump on to seat. -180 GPM ~ 860 psi, pressured up to 1370 psi to activate catcher. POH backreaming from 4855' to 4613' -200 GPM ~ 1460 psi, 25 RPM ~ 2-3k torque. -No overpull *Lost total of 7 bbls of coring fluid for the day. (During trips only) Continue POH with core #7, backreaming from 4613' to 4424' -200 GPM ~ 1460 psi, 25 RPM ~ 2-3k torque. -No overpull -Open circ sub and pump out one stand to 4329' ~ 500 GPM ~ 2600 psi. -No overpull Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. POH as per tripping schedule 4329' to 76'. PJSM with core Iab,Baker coring and crews. Printed: 8/628 12:18:26 PM ~i BP Page 13 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/14/2008 ~ 06:00 - 08:30 ~ 2.50 ~ EVAL ~ P ~ ~ INT1 08:30 - 10:00 1.501 EVAL P INT1 10:00 - 14:30 4.50 EVAL P INT1 14:30 - 15:30 1.00 EVAL P INT1 15:30 - 00:00 8.50 EVAL P INT1 5/15/2008 ~ 00:00 - 01:00 ~ 1.00 ~ EVAL ~ P ~ ~ I NT1 01:00 - 01:30 0.50 EVAL P INTi 01:30 - 11:00 9.50 EVAL N RREP INT1 11:00 - 14:30 I 3.501 EVAL I P I INT1 14:30 - 15:30 1.001 EVAL P I I INT1 15:30 - 16:30 1.00 EVAL P INT1 16:30 - 17:00 0.50 EVAL P INT1 17:00 - 19:00 0.00 EVAL P INT1 19:00 - 20:00 1.00 EVAL P INT1 20:00 - 21:00 1.00 EVAL P INT1 21:00 - 21:30 0.50 EVAL P INT1 21:30 - 22:00 0.50 EVAL P INT1 22:00 - 22:30 0.50 EVAL P INT1 -Retrieve ball,change out circ. sub. -Break out bit,remove split ring. -Install core cap and run into top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. -Run in to 76'. -Rack back coring assembly. Clear and clean rig floor. Prepare BOP stack for BOPE test with water. Pull wear bushing, set test plug. -Rig up 4" test joint and test equipment. Test BOPE with 4" test joint. -250 psi low, 3500 psi high. -Each test 5 minutes each. -Accumulator drawdown test. -Test witnessed by AOGCC rep Jeff Jones, BP WSLs Tom Anglen, Robert French, NAD TPs Mark Ashley, Tim Leigh. -Trouble shoot and attempt tests on air actuated IBOP topdrive valve and Annular preventer without success. -Rig down 4" test equipment and change over to 3.5" test equipment. -Start ram tests with 3.5" test joint. "No mud losses for the day. Continue testing rams with 3.5" test joint. -250 psi low, 3500 psi high. -Hold each test for 5 minutes each. Rig down test equipment. Leave blind rams closed. Change out air actuated IBOP valve on topdrive. Trouble shoot annular preventer hydraulic problem. -Repair 4-way control valve on accumulator. Rig up to test with 4" test joint. Test annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. - Change out to 3.5" test joint. Test upper, lower rams, and annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. Test witnessed by BP WSL Tom Anglen and NAD TP Mark Ashley. Rig down test equipment. Suck out water from BOP stack. Slowdown lines. Clean rig floor. Pick up core assembly and inspect coring bit. Run in hole with coring assembly from 76' to 3002'. -PU - 82k, SO - 69k. Install blower hose. Circulate ~ shoe. -250 gpm, 750 psi, 20 rpm, 1.7k TO. -PU - 87k, SO - 74k, RWT - 78k. Run in hole from 3002' to 4164'. Taking weight. Wash and ream from 4141' to 4325' taking steady 5k WOB. -200 gpm, 725 psi, 25 rpm, 2.7k TO. Backream from 4325' to 4141'. MW - 10.5 ppg in and out. POH for 9 7/8" hole opener from 4141' to 4047. No drag. -Monitor well -static. rnmeu: aoicvvo ic. io.cv rm • ~ gp Page 14 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/15/2008 22:00 - 22:30 0.50 EVAL P INTi 22:30 - 23:30 1.00 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INT1 5/16/2008 00:00 - 02:00 2.00 EVAL P INT1 02:00 - 03:00 1.00 EVAL P INT1 03:00 - 04:00 1.00 EVAL P INT1 04:00 - 05:00 1.00 EVAL P INT1 05:00 - 06:00 1.00 EVAL P INT1 06:00 - 07:00 1.00 EVAL P INT1 07:00 - 07:30 0.50 EVAL P INT1 07:30 - 08:00 0.50 EVAL P INT1 08:00 - 08:30 0.50 EVAL P INT1 08:30 - 14:00 5.50 EVAL P INT1 14:00 - 16:00 2.001 EVAL I P INTi 16:00 - 16:30 0.50 EVAL P INT1 16:30 - 17:00 0.50 EVAL P INT1 17:00 - 17:30 0.50 EVAL P INT1 17:30 - 19:00 1.50 EVAL P INT1 19:00 - 20:00 1.00 EVAL P INTi 20:00 - 21:30 1.50 EVAL P INTi 21:30 - 00:00 2.50 EVAL P INT1 5/17/2008 00:00 - 00:30 0.50 EVAL P INT1 00:30 - 01:15 0.75 EVAL P INT1 01:15 - 02:30 1.25 EVAL P INTi 02:30 - 03:30 1.001 EVAL I P I I INT1 03:30 - 04:00 I 0.501 EVAL I P I I INT1 -Pump dry job. POH from 4047' to shoe. Monitor well -static. POH from 3025' to 2623'. Continue POH with core assembly #16. -Stand back core assembly. Clear and clean rig floor. Pick up and make up hole opener assembly #17 to 925. Run in hole from 925' to 3020'. Cut and slip 92' drilling line. Service topdrive, crown, and drawworks. Circulate ®shoe. -500 gpm, 2100 psi. -60 rpm, 1.9k TO. -PU - 90k, SO - 75k. Run in hole from 3020' to 4346'. Precautionary wash from 4346' to 4454'. -500 gpm, 2600 psi, 120 rpm, 3k TO. Open 8 1 /2" hole to 9 7/8" from 4454' to 4815'. -500 gpm, 2495 psi off, 2525 psi on. -120 rpm, 3.1 k TO off, 4.5k TO on. -PU - 122k, SO - 90k, RWT - 107k, WOB - 10k. Circulate 15 minutes prior to connections. Circulate 3 bottoms up. -500 gpm, 2520 psi. -120 rpm, 4.1 k TO. -MW - 10.5 ppg in and out. -Monitor well -static. POH from 4815' to 4356'. -PU - 130k, SO - 96k. Monitor well -static. -Pump dry job. POH from 4356' to 3020'. -Monitor well -static. POH from 3020' to 95'. Laydown hole opener assembly BHA #17. Clear and clean rig floor. Pick up coring assembly, BHA #18 and run in hole to 3003'. *5 bbl coring fluid loss for the day. Circulate at shoe. -255 gpm, 655 psi. Run in hole from 3003' to 4708'. Wash to bottom ~ 4855' -250 GPM ~ 930 psi -PU 15 ft pup joitn required for space out, drop ball. -Pump ball to seat 150 psi pressure increase. -Record slow pump rates Core (#8) from 4855' to 4905'. -PU - 125k, SO - 95k, RWT - 106k. -200 GPM ~ 890 psi off bottom 975 psi on bottom -WOB 5k, 55 RPM, Torque off bottom 4k on bottom 7k -Mud wt in and out 10.5 ppg. Drop ball and pump on to seat. -200 GPM ~ 835 psi, pressured up to 1290 psi to activate Printetl: 8/6/2008 l z:l ti26 1'M ~ • BP Page 15 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/17/2008 03:30 - 04:00 0.50 EVAL P INT1 catcher. 04:00 - 04:30 0.50 EVAL P INT1 POH backreaming from 4905' to 4708' 04:30 - 05:00 ~ 0.50 ~ EVAL ~ P ~ ~ INT1 05:00 - 11:00 6.00 EVAL P INTi 11:00 - 13:00 2.00 EVAL P INT1 13:00 - 14:00 1.001 EVAL I P INT1 14:00 - 14:30 0.50 EVAL P INT1 14:30 - 16:30 2.00 EVAL P INT1 16:30 - 17:00 0.50 EVAL P INT1 17:00 - 18:00 1.00 EVAL P INT1 18:00 - 19:30 1.50 EVAL P INT1 19:30 - 21:00 ~ 1.50 ~ EVAL ~ P ~ ~ INT1 21:00 - 21:30 I 0.50 EVAL I P INT1 21:30 - 23:00 I 1.501 EVAL P I I INT1 23:00 - 23:30 0.50 EVAL P INTi 23:30 - 00:00 0.50 EVAL P INT1 5/18/2008 00:00 - 05:00 5.00 EVAL P INT1 05:00 - 08:00 3.00 EVAL P INT1 -200 GPM ~ 1215 psi, 20 RPM ~ 4k torque. -No overpull, one 10k torque spike ~ 4777'. -Open circ sub and pump out one stand to 4613' -425 GPM ~ 1940 psi. Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. POH as per tripping schedule 4613' to 76'. PJSM with core Iab,Baker coring and crews. -Retrieve ball, change out circ. sub. -Break out bit, remove split ring. -Install core cap and run in to top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. - Run in to 76'. Clean and clear rig floor. Run in hole from 76' to 3003'. -Up wt 86k down wt 72k Circulate at shoe. -Stage pumps up to 250 GPM ~ 745 psi. -25 rpm, 3.6k tq. Run in hole from 3002' to 4707'. Wash to bottom ~ 4905' -200 GPM ~ 860 psi -Pump ball to seat, 120 psi pressure increase. -Record slow pump rates Core (#9) from 4905' to 4965'. -PU - 128k, SO - 98k, RWT - 108k. -200 GPM ~ 925 psi off bottom 960 psi on bottom -WOB 4-7k, 50 RPM, Torque off bottom 3.7k on bottom 5.1 k -Mud wt in and out 10.6 ppg. Drop ball and pump on to seat. -180 GPM fd 790 psi, pressured up to 1~~10 psi to activate catcher. POH backreaming from 4965' to 4798' -210 GPM ~ 1260 psi, 20 RPM ®4.3k torque. -No overpull i~-Open circ sub and backream 1 stand to 4702' -445 GPM ~ 2200 psi, 25 rpm ~ 4k tq. Attempt to POH dry. 25k drag. -Backream 2 more stands to 4511'. -445 GPM ~ 2110 psi, 25 rpm ~ 3.6k tq. -POH dry 2 stands to 4329'. Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. -MW 10.6 ppg in and out. POH as per tripping schedule 4329' to 4235'. POH as per tripping schedule 4329' to 76'. PJSM with core Iab,Baker coring and crews. rnmea: wweuun ~cies:~orm g P Page 16 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/18/2008 05:00 - 08:00 3.00 EVAL P INT1 -Retrieve ball, laydown circ. sub. -Break out bit, remove split ring. -Install core cap and run in to top sub. -Remove inner barrel with core #9 and lay down to pipeshed. 08:00 - 08:30 0.50 EVAL P INT1 Clear and clean rig floor. 08:30 - 09:00 0.50 EVAL P INTi Service topdrive, drawworks, and crown. 09:00 - 11:30 2.50 EVAL P INT1 Finish cutting cores in pipeshed. Rig down core equipment in pipeshed. 11:30 - 12:30 1.00 DRILL P INT1 Load BHA into pipeshed. Program MWD/Eco Scope tools. 12:30 - 15:00 2.50 DRILL P INT1 PJSM. Pick up and make up drilling BHA #20: New HTC 8.5" MXL-iX bit, NM Stab, Eco Scope, MWD, 8.5" ghost reamer, tea NM DC, NM stab, ball catcher, CCV, 1 jt 5" HWDP, Jar, 1 jt 5" HWDP, XO, 24 jts 4" HWDP. -Shallow hole test MWD ~ 980', 400 gpm, 1145 psi. 15:00 - 16:00 1.00 DRILL P INT1 Run in hole from 980' to 3010'. 16:00 - 16:30 0.50 DRILL P INT1 Circulate at shoe. -450 gpm, 2160 psi. -50 rpm, 2.2k torque. -PU - 96k, SO - 78k, RWT - 86k. -Install blower hose, record slow pump rates. 16:30 - 17:30 1.00 DRILL P INT1 Run in hole from 3010' to 4874'. -Wiped 9 7/8" x 8.5" interface - no drag. 17:30 - 18:30 1.00 DRILL P INT1 Wash and ream to bottom ~ 4965'. -300 gpm, 1450 psi, 40 rpm, 4.4k torque. -Record slow pump rates. 18:30 - 23:30 5.00 DRILL P INT1 Drill 8.5" logging rathole from 4965' to TD ®5165' MD, 4687' TVD. -475 gpm, 2910 psi off bottom, 3050 psi on bottom. -120 rpm, 4.6k tq off bottom, 4.8k tq on bottom. -PU - 145k, SO - 100k, RWT - 114k. -ADT - 4.13 hrs 23:30 - 00:00 0.50 DRILL P INT1 Circulate bottoms up at TD. 475 gpm, 2850 psi, 120 rpm, 4.9k torque. 'No mud loss for the day. 5/19/2008 00:00 - 00:30 0.50 DRILL P INT1 Finish circulating bottoms up at TD. -475 gpm, 2850 psi, 120 rpm, 5k torque. 00:30 - 08:00 7.50 DRILL P INT1 MadPass log from 5165' to 4401'. -150 fph max, survey every 90'. -475 gpm, 2730 psi, 55 rpm, 4.8k torque. -Wiped 8 1/2" x 9 7/8" interface several times - no drag. -Monitor well ~ 4401' -static. MW 10.6 ppg in and out. 08:00 - 09:30 1.50 DRILL P INT1 POH from 4401' to 2979'. -Pulled tight to 35k over from 4375' to 4355'. Wiped clean. 09:30 - 10:00 0.50 DRILL P INT1 Open CCV, circulate at shoe. -600 gpm, 3000 psi. -Monitor well -static. -Pump dry job. 10:00 - 11:30 1.50 DRILL P INT1 POH from 2979' to 245'. -Close CCV. 11:30 - 12:00 0.50 DRILL P INT1 Stand back jar stand. -Slowdown topdrive and clean floor. 12:00 - 14:00 2.00 DRILL P INT1 PJSM on nuclear source. Laydown BHA #20. rnntea: wazwa ~c.ia:co rm g'p Page 17 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations 5/19/2008 12:00 - 14:00 2.00 DRILL P INT1 -Bit grade - 1-1-NO-A-E-I-NO-TD 14:00 - 15:30 1.50 DRILL P INT1 Clear and clean rig floor. 15:30 - 17:00 1.50 EVAL P INTi Spot E-line unit and build logging tools. -Continue cleaning rig. 17:00 - 19:30 2.50 EVAL P INT1 Rig up SWS wireline. 19:30 - 23:30 4.00 EVAL P INT1 Run in hole with Platform Express and Dipole Shear Sonic Imager loggine tools to 5140'. Log from 5140' to 2600'. POH with logging tools. 23:30 - 00:00 0.50 EVAL P INT1 Rig down SWS wireling. 5/20/2008 00:00 - 01:30 1.50 EVAL P INT1 Continue rigging down SWS tools, clean and clear floor 01:30 - 03:00 1.50 PXA P SURE PJSM. Rig up to run 3.5" NSCT cement stinger. 03:00 - 05:00 2.00 PXA P SURE Pick up and make up 3.5" NSCT mule shoe and 27 joints of NSCT tubing to 858'. 05:00 - 05:30 0.50 PXA P SURE Rig down tubing running equipment and change over to 4" drill pipe equipment. 05:30 - 07:30 2.00 PXA P SURE Run in hole with cement stinger on 4" drill pipe from 858' to 5165'. Up Wt. 110k Dn. Wt. 80k 07:30 - 08:30 1.00 PXA P SURE Circulate and Reciprocate ~ 5165'. Stage pumps at 515 bpm ~ 3100 psi. Up Wt. 105k Dn. Wt. 80k 08:30 - 09:30 1.00 PXA P SURE PJSM with Dowell. Pumped 5 bbl of H2O and pressure tested lines to 4000 psi. Good Test Pumped a spacer of 19 bbl of Chem Wash, then 69 bbl 15.8 ppg of class G cement, then follwed with 2.5 bbl of H2O. Swapped over to rig pumps and displaced with 37 bbl of 10.5 ppg MOBM. 09:30 - 10:00 0.50 PXA P SURE Trip out of hole from 5156' to 4365' Up Wt. 95k Dn. Wt. 80k 10:00 - 10:30 0.50 PXA P SURE Circulate a bottoms up ~ 4365'. 600 gpm ~ 2900 psi Up Wt. 95k Dn. Wt. 75k 10:30 - 11:30 1.00 PXA P SURE Wash down to 4435'. Rig up the cement head and lines Pumped a spacer of 19 bbl of Chem Wash, then 91 bbl 15.8 ppg of class G cement, then foliwed with 2.5 bbl of H2O. Swapped over to rig pumps and displaced with 30 bbl of 10.5 ppg MOBM. 11:30 - 12:30 1.00 PXA P SURE Rig Down the cement head and lines. Trip out of the hole from 4435' to 3465'. 12:30 - 14:30 2.00 PXA P SURE Circulate and condition 2x drill pipe volume ~ 500 gpm, 1820 psi. Pump wiper ball and condition. i PJSM for cement plug #3 14:30 - 15:00 0.50 PXA P SURE Wash down from 3465' to 3650' ~ 500 gpm, 1780 psi 15:00 - 16:30 1.50 PXA P SURE Rig up the cement head and lines Pumped a spacer of 19 bbl of Chem Wash, then 82 bbl 17 ppg of class G cement, then foliwed with 2.5 bbl of H2O. 16:30 - 17:00 0.50 PXA P SURE Trip out of hole from 3650' to 2825' Pump wiper ball and condition. 17:00 - 19:30 2.50 PXA P SURE Displace to water based mud, pump spacer ~ 400 gpm, 1710 Printed: 8/62008 12:18:26 PM • BP Page 18 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/20/2008 17:00 - 19:30 2.50 PXA P SURE psi Displace with seawater 19:30 - 22:00 2.50 PXA P SURE Trip out of hole from 2825' to 810' Rig up to UD 31/2" tubing 22:00 - 00:00 2.00 PXA P SURE Continue to trip out of the hole from 810' to 345' 5/21/2008 00:00 - 02:00 2.00 P SURE Continue laying down 3 1/2" tubing from 345' to 0' Bottom 5 joints had 1/8" shealth of cement on them 02:00 - 09:00 7.00 PXA P SURE Clean and clear the floor and scrub the pits to get all remaining 09:00 - 11:30 2.50 PXA N WAIT SURE 11:30 - 16:30 5.00 PXA P SURE 16:30 - 21:00 4.50 PXA N WAIT SURE OBM out of the mud system. Used hot soapy water to clean the system out Flushed out the stack. Waiting on trucks due to G & I being down. -Unable to continue cleaning due to waste fluids. Clean and clear the floor and scrub the pits to get all the remaining OBM out of the mud system. Used hot soapy water to clean out the entire system. Waiting on trucks due to G & I being down. -Unable to transport mud from plant to rig. rnniea: aw~wa ic. w:co rm gp Page 1 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/21/2008 21:00 - 00:00 3.00 DRILL P INTi PJSM, Consisted of Nad rig crew, DD, MWD, and BP WSL Matt Martyn and WSLf Chris Kobuck. Preparing to pick up BHA # 21 that consists of nukes. -Began to pick up BHA to MWD tool. 5/22/2008 00:00 - 03:30 3.50 DRILL P INT1 Continued to pick up BHA # 21 and run in the hole to 2804'. -Began to wash down ~ 1 bpm, 100 psi to 3016'. -Tagged cement ~ 3016' and slacked off 30k on it. -AOGCC witness waived by Bob Noble. Test witnessed by BP WSL Matt Martyn. 03:30 - 04:00 0.50 DRILL P INT1 Drill out cement from 3016' to 3025' -Up Wt. 120k /Down Wt. 70k /ROT 90k / WOB 2k -450 gpm ~ 1100 psi off and 1200 psi on -55 RPM, TO 6k on / 4k off 04:00 - 05:30 1.50 DRILL P INT1 Displace mud system to Water Base -LSND 8.8 ppg -475 gpm ~ 840 psi -Cleaned surface equipment while displacing 05:30 - 08:30 3.00 DRILL P INT1 Control Drill out cement from 3025' to 3089' -Up Wt. 105k /Down Wt. 80k /ROT 90k / WOB 2k -650 gpm ~ 1350 psi off and 1375 psi on -40 RPM, TO 5k on / 4k off -Established ECD baseline ~ 3029' 08:30 - 12:00 3.50 DRILL P INT1 Drill 9 7/8" from 3089' to 3660' -Up Wt. 115k /Down Wt. 80k /ROT 92k / WOB 10k -650 gpm ~ 1675 psi off and 1740 psi on -80 RPM, TO 6k on / 5k off -CECD 9.06 AECD 9.73 -ART 1.88 / AST 1.68 /ADT 3.56 -Pumped a 32 bbl Hi-Vis sweep ~ 3600' and had a 5% increase in returns. 12:00 - 00:00 12.00 DRILL P INT1 Drill 9 7/8" from 3660' to 4833' -Up Wt. 135k /Down Wt. 93k /ROT 107k / WOB 10k -650 gpm ~ 2225 psi off and 2420 psi on -80 RPM, TO 6k on / 5k off -CECD 9.32 AECD 10.03 -ART 6.62 / AST 1.82 /ADT 8.44 5/23/2008 00:00 - 05:00 5.00 DRILL P INTi Drill 9 7/8" from 4833' to 5271' -Up Wt. 137k /Down Wt. 90k /ROT 105k / WOB 20k -650 gpm ~ 2440 psi off and 3200 psi on -80 RPM, TO 9k on / 7k off 05:00 - 06:00 1.00 DRILL P INT1 Circulate and discuss final TD due to geological tops. -Rotate and Reciprocate 2x bottoms up ~ 5270'. -440 gpm ~ 1400 psi 06:00 - 11:30 5.50 DRILL P INTi Drill ahead from 5270' to 5590' -Up Wt. 137k /Down Wt. 90k /ROT 106k / WOB 20k -650 gpm ~ 2850 psi off and 3000 psi on -80 RPM, TO 9k on / 7k off -AECD = 9.88 CECD= 9.38 -MW In & Out 9.2ppg 11:30 - 12:00 0.50 DRILL P INT1 Circulate and condition mud ~ 5590' -Rotate and Reciprocate 1 x bottoms up ~ 5590 -650 gpm ~ 2850 psi rnrneu. iicuicwo c.co.w~ rrv~ ~. BP Page 2 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: i Date From - To Hours Task Code NPT Phase Description of Operations 5/23/2008 12:00 - 17:30 5.50 DRILL P INT1 Back ream from 5590' to 3945'. -Mad Pass from 5590' to 4350' -Up Wt. 130k /Down Wt. 90k /ROT 105k -650 gpm ~ 2650 psi off -80 RPM, TO 7k off 17:30 - 21:00 3.50 DRILL P INT1 Trip out of the hole from 3945' to 152' -Monitor well "static" -Up Wt. 125k /Down Wt. 90k 21:00 - 22:30 1.50 DRILL P INT1 Lay down BHA # 21 and clean and clear floor for logging tools. 22:30 - 00:00 1.50 EVAL P INT1 PJSM, w/SWS and NAD hands, BP WSL Matt Martyn and WSLf Chris Kobuck. -Rig up SWS wireline and prepare to begin logging. 5/24/2008 00:00 - 06:00 6.00 EVAL P INT1 Running in hole to w/ MDT tools on DP to -4,125' md. 06:00 - 10:00 4.00 EVAL P INT1 Run in hole from 4125' to 4314' -Verified latch up, 5bpm ~ 405 psi 10:00 - 12:00 2.00 EVAL P INT1 Pressure samples ~ 4380.6' , 4386.6', and 4412.6' -Up Wt. 105k Down Wt. 80k 12:00 - 00:00 12.00 EVAL P INT1 MDT pressure samples - 4461.7', 4463.8', 4485.6', 4488.6', 4572.6', 4592.6', 4594.6', 4610.6', 4612.6', 4669.5', 4677.6', 4712.7', 4877.5', 4878.6', 4901.6', 4916.6', 4917.7', 4935.6', 5015.6', 5026.7', 5064.5', 5108.5', 5128.7', 5251.6', 5252.6', 5271.6' - Up Wt. 120k Down Wt. 82k -Mud Wt In & Out 9.2 ppg 5/25/2008 00:00 - 02:30 2.50 EVAL P INTi MDT Pressures -5265', 5301'. 5430', 5449', 5503' 02:30 - 05:00 2.50 EVAL P INT1 MDT Sample # 1 ~ 5265' - SB_OBa Formation - 2 450cc chambers of fluid recovered 05:00 - 13:30 8.50 EVAL P INTi MDT Sample # 2 ~ 5122', 5124', 5130' - SB OBb Formation - No Fluid recovered -Going to attempt to get a sample after completing other samples. 13:30 - 17:00 3.50 EVAL P INT1 MDT Sample # 3 ~ 5503' - SB_OBd Formation - 3 450cc chambers of fluid recovered 17:00 - 21:00 4.00 EVAL P INT1 MDT Sample # 4 ~ 5009' - SB_OBa Formation -3 450cc chambers of fluid recovered 21:00 - 00:00 3.00 EVAL P INT1 MDT Sample # 5 ~ 4895' -SB OA Formation -2 450cc chambers of fluid recovered 5/26/2008 00:00 - 03:30 3.50 EVAL P INTi MDT Sample # 6 ~ 4673' -SB Nb Formation -4 450cc chambers of fluid recovered 03:30 - 06:30 3.00 EVAL P INT1 Attempting to get a sample from the 5122' - 5130' area that wasn't successful earlier. -Sample was unsuccessful due to geology..tool working properly but sample was not recovered. 06:30 - 08:00 1.50 EVAL P INT1 Trip out of the hole from 5102' to 4080' -Up Wt. 120k Down Wt. 75k 08:00 - 10:00 2.00 EVAL P INTi PJSM, Rig Down SWS Printed: 7/23/2008 2:28:44 PM t r gp Page 3 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 15/26/2008 110:00 - 12:00 I 2.001 EVAL I P 12:00 - 15:30 3.50 EVAL P 15:30 - 16:00 0.50 EVAL P 16:00 - 16:30 0.50 EVAL P 16:30 - 17:30 1.00 EVAL P 17:30 - 18:30 1.00 EVAL P 18:30 - 19:30 1.00 EVAL P 19:30 - 21:00 1.50 EVAL P 21:00 - 21:15 I 0.25 I EVAL I P 21:15 - 00:00 I 2.75 I EVAL I P 5/27/2008 100:00 - 02:00 2.001 EVAL 1 P 02:00 - 03:30 I 1.50 I CASE I P 03:30 - 07:00 3.50 CASE I P 07:00 - 10:00 I 3.00 I CASE I P 10:00 - 10:30 0.50 CASE P 10:30 - 12:00 1.50 CASE P 12:00 - 13:00 1.001 CASE 1 P 13:00 - 21:30 8.501 CASE 1 P 21:30 - 22:30 I 1.001 CASE I P INT1 Monitor well, static -Pump 15 bbl 11.5 ppg Dry Job, 170 gpm ~ 265 psi -Blow down the top drive -Trip out of the hole from 4080' to 161' INT1 PJSM, Lay down SWS tools -clean and clear floor INT1 PJSM, Pick up clean out BHA # 22 -9.875 Hole Opener, 9.875 NB Stab, Jars INT1 Run in hole to 938' INT1 Service rig, crown, and adjust the brakes INT1 Run in hole from 938' to 2938' -Install blower hose and fill pipe -Up Wt. 96k Down Wt. 68k INT1 Continue to run in the hole from 2938' to 5499' INTi Screw into drillstring and stage pumps up to 650 gpm, 2540 psi. PU - 135k, SO - 70k, RTW - 100k. 120 rpm, 6k TO. Circulate bottoms up followed by 35 bbl hi vis sweep surface to surface. Shakers cleaned up well after initial bottoms up. No change in cuttings load on shakers once sweep back to surface. No losses while circulating. INT1 Shut down, monitor well -static. MW in 9.2 ppg, MW out 9.2 ppg. Pump dry job. Install air slips. Prepare to POH. INT1 POH from TD to top of cleanout BHA. No overpulls over 5k on trip out. INT1 PJSM, Lay down BHA # 22 from cleanout run. -Everything in great shape...no sticky spots found. INT1 PJSM, Rigging up to run 7 5/8" casing. Change out upper rams from variables to 7-5/8" pipe rams. PU 7-5/8" test joint & test upper rams to 500 psi low & 3,500 psi high. Good test. INT1 Continue to RU for casing run. Make dummy run with landing joint. Install 350 ton elevators and slips. INT1 PU and RIH with 7-5/8" 29.7# L-80 BTC-M shoe track and check floats -holding. Continue PU and RIH with 7-5/8" 29.7# L-80 BTC-M casing to 1,155', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 8,400 ft-Ibs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. INTi RU the rig floor to run 7-5/8" VamTop casing. INT1 Crossover and RIH with 7-5/8" 29.7# L-80 VamTop to 1768' - torque fuming each connection with 14,450 ft-Ibs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. INT1 Circulate a bottoms up prior to going into the open hole with the casing - 302 gpm, 547 psi, PU - 115k, SO - 92k. INT1 Continue PU and RIH with 7-5/8" 29.7# L-80 VamTop to 5,555' -torque fuming each connection with 14,450 ft-Ibs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation every 5 joints RIH and circulated for 10 minutes every 15 joints while running in the hole. INT1 MU the casing hanger and landing joint. Land the hanger on the ring with the shoe at 5,582'. LD the fillup tool and RU the rnntea: iicsrtuuts c.~ts:ac riw gp Page 4 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code. NPT Phase Description of Operations 5/27/2008 21:30 - 22:30 1.00 CASE P INT1 cement head, PU - 210k, SO - 115k. 22:30 - 00:00 I 1.501 CASE I P 15/28/2008 100:00 - 03:00 I 3.001 CEMT I P INT1 INT1 03:00 - 04:00 I 1.00 I CEMT I N ~ CEMT I INT1 04:00 - 05:30 I 1.501 CEMT I N I CEMT I INT1 05:30 - 12:00 I 6.501 CEMT I N I CEMT I INTi 12:00 - 16:30 I 4.50 I CEMT I N I CEMT I INT1 16:30 - 17:30 1.00 CEMT N CEMT INT1 17:30 - 18:30 1.00 CEMT N CEMT INT1 18:30 - 19:30 1.00 CEMT N CEMT INTi 19:30 - 20:30 1.00 CEMT N CEMT INTi 20:30 - 21:30 1.00 CEMT N CEMT INT1 Ran total of: 25 jts 7 5/8" 29.7# L-80 BTC-M casing, 110 jts 7 5/8" 29.7# L-80 VamTop casing 1 X-over jt 7 5/8" TCII box XBTC-M pin 2 ea. 10' BTC-M pup joints 4 ea. 20 'BTC-M pup joints X81 straight 7-3/4" x 9-5/8" x 8" centralizers X40 stop rings Shoe ~ 5,582' RA tags ~ 5,072', 4,915', & 4,689' Circulate and condition mud -Stage pumps up to 7 bpm ~ 570 psi -Up Wt. 205k Down Wt. 110k 7 5/8" Casing Cement Job -Pump 5 bbls of water ~ 5 bpm -Pressure test lines to 3500 psi -Pump 50 bbls of 12ppg Mud Push ~ 5 bpm -Drop Bottom Plug -Kick out plug with 82 bbls of 16 ppg cement containing durastone -Drop top plug -Kick out plug with 5 bbls from Dowell -Pressured up with 2340 strokes -Issues with bottom plug bursting, pressured up with rig pumps to 3800 psi with no luck -Switched over to Dowell pumps and pressured to 5000 psi 5 different times with no luck. Conference call with Mike Shultz, Rob Tirpack, Scott Kolstad, Matt Martyn, Brian Buzby, and Chris Kobuck to decide what actions are to be taken due to cement displacement issues. Rigging up to pull 7 5/8" casing. -350 ton elevators, power tongs, and prep rig floor and pipe shed for laying down the casing. PJSM, Lay down 7 5/8" 29.7# L-80 Vam Top HC from 5582' to 3717' -Up Wt. 200k Down Wt. 130k Continue to lay down 7 5/8" 29.7# L-80 Vam Top HC from 3717' to 2954' -Up Wt. 160k Down Wt. 110k -Pick up hanger and and landing joint -Land casing ~ 2982' Rig down 7 5/8" Casing Equipment -Change out bales from long to short bales Install Pack-off -FMC hand Keith on hand for packoff installation. PJSM, Pick up tools to the floor -Make up BHA #23 for cement clean out Run in hole from 142' to 877' Ream down from 877' to 1111' -103 spm ®300 gpm, 475 psi Printed: 7/23/2008 2:28:44 PM i ~ BP Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 9ES Date From - To Hours Task Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Page 5 of 30 ~ Spud Date: 4/27/2008 End: 7/8/2008 Phase Description of Operations ~ 5/28/2008 ~ 20:30 - 21:30 ~ 1.00 ~ CEMT ~ N ~ CEMT ~ INT1 21:30 - 00:00 2.501 CEMT I N I CEMT I INTi 15/29/2008 100:00 - 12:00 I 12.00 I CEMT I N I CEMT INT1 12:00 - 19:00 I 7.00 I CEMT I N I CEMT I INT1 19:00 - 20:00 1.00 CEMT N I CEMT I INTi 20:00 - 21:00 1.00 CEMT N I CEMT I INT1 21:00 - 21:30 I 0.501 CEMT N I CEMT I INT1 21:30 - 22:30 1.00 CEMT N CEMT I NTi 22:30 - 23:00 0.50 CEMT N CEMT I NT1 23:00 - 00:00 1.00 CEMT P I NT1 5/30/2008 ~ 00:00 - 04:30 ~ 4.50 ~ CEMT ~ P ~ ~ INT1 04:30 - 05:00 0.501 CEMT N I CEMT INT1 05:00 - 05:30 0.501 CEMT N I CEMT INTi 05:30 - 06:30 1.00 CEMT N CEMT INT7 06:30 - 12:00 5.50 CEMT N CEMT INT7 -Up Wt. 55k Down Wt. 52k ROT 53k -25 RPM with 4k Torque -Top Plug located ~ 1111' -Verification of Black Plug found on shakers -Initially Durastone was thick coming over shakers, than tapered off to minimal Durastone on the shakers. Ream down from 1111' to 1259' -103 spm ~ 300 gpm, 520 psi off 760 psi on -Up Wt. 60k Down Wt. 55k ROT 59k -30 RPM with 4k Torque off and 1.6k on Drill out cement from 1259' to 2117' -103 spm ~ 300 gpm -Up Wt. 75k Down Wt. 60k ROT 67k WOB 15k -30 RPM with 2.5k Torque off and 1.5k on -Psi On 975 /Off 780 -ROP started to become erratic around 1530' after varying parameters, still no Iuck...After spudding on bit obstruction broke free and ROP picked back up to normal. Drill out cement from 2117' to 2466' -101 spm ~ 300 gpm -Up Wt. 80k Down Wt. 65k ROT 72k WOB 20k -30 RPM with 2k Torque off and 2.4k on -Psi On 1205 /Off 890 Circulate a bottoms up -101 spm ~ 300 gpm , 930 psi -Displace to 8.5ppg clean seawater -77 spm ~ 228 gpm , 475 psi Begin to trip out of the hole from 2466' to 112' -Up Wt. 84k Down Wt. 66k Lay down BHA -Jars, Bypass sub, and Motor Pull wear ring and flush out the stack to prepare for BOP test Pick up BOP test tools -Install the test plug and rig up to test BOPs Rig up to test with 7 5/8" test joint. Test annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. -Test witnessed by BP WSL Matt Martyr and NAD TourPusher Wayne Stout. -Witness waived by AOGCC rep Jeff Jones Continue to Test BOP - Change out to 4" test joint. Test upper, lower rams, and annular preventer to 250 psi low, 3500 high -Test Winessed by BP WSL Matt Martyr and NAD TourPusher Wayne Stout. Lay down the test plug -Install the wear bushing with a 73/8" ID Pick up BHA # 24 -6 3/4" Bit, Motor, Drill Collars, Jars, HWDP -Run in hole to 142' Continue to trip in the hole from 142' to 2466' Drill up cement from 2466' to 2861' rnntea: iic:v[uua cca:~ rm ~r s BP - Page 6 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Gode NPT ..Phase Description of Operations 5/30/2008 06:30 - 12:00 5.50 CEMT N CEMT INT1 -Up Wt. 90k Down Wt. 71k ROT 77k 12:00 - 13:30 1.50 CEMT N CEMT INT1 13:30 - 15:30 2.00 CEMT N CEMT INT1 15:30 - 16:00 0.50 CEMT N CEMT INT1 16:00 - 17:00 1.00 CEMT N CEMT INT1 17:00 - 18:00 1.00 CEMT N CEMT INT1 18:00 - 00:00 I 6.00 I CEMT I N I CEMT I INT1 15/31/2008 100:00 - 06:30 I 6.501 CASE I N I CEMT I INT1 06:30 - 08:00 1.50 CASE N CEMT INT1 08:00 - 09:00 1.00 WHSUR N CEMT INT1 09:00 - 11:00 2.00 WHSUR N CEMT INT1 11:00 - 12:00 1.00 WHSUR N CEMT INT1 12:00 - 13:00 1.00 CASE N CEMT INT1 13:00 - 14:30 1.50 CASE N CEMT INT1 14:30 - 16:30 2.00 CASE N CEMT INT1 16:30 - 18:00 I 1.501 CASE I N I CEMT I INT1 18:00 - 22:30 I 4.501 CASE I N I CEMT I INT1 -300 gpm ~ 910 psi on / 765 psi off -WOB 15k -Torque 2.2k on / 2k off Circulate bottoms up - 102 spm , 302 gpm ~ 764 psi -Pump Hi-vis sweep and chase with water -78 spm, 232 gpm ~ 457 psi Trip out of hole from 2861' to 142' -Up Wt. 90k Down Wt. 70k Lay down BHA # 24 Pull wear ring and pack off Make up landing joint and pull hanger to floor and lay down -Up Wt. 115k Oown Wt. 90k -MWT 9.1 ppg Lay down casing 1 at a time from 2954' to 1434' -All threads inspected by VAM rep Andy Fain -Up Wt. 75k Continue to lay down 7 5/8" Casing from 1434' to 93' -Cut a hole in the casing with the assistance of the welder in order to analyze the issues with the cement additives (durastone) -Bottom plug (orange) was located at the float collar -Completely packed off with Durastone in plug and last joint. -Plug sheared but was packed off by Durastone Finish pulling shoe track and then rig down casing equipment -Clean and Clear rig floor and prepare to change out rams. Flush out the BOP stack and install the test plug. Rig up testing equipment. Change out rams from 7 5/8" to 3 1/2" x 6" Vari Rams -Test to 250 psi low / 3500 psi high...Good test Blow down all test equipment -Pulled the test plug -Installed the wear ring Pick up BHA # 25 -Hole Opener, HWDP, Jars, HWDP Run in hole from 108' to 2938' -Fill pipe and install blower hose -Up Wt. 95k Down Wt. 70k Continue to run in the from from 2938' to 5499' -Wash down to 5591' -202 spm ~ 599 gpm, 2321 psi -Saw a few tight spots running in the hole that took 20k over -3182' -3900' -4000' Circulate a bottoms up -Pump 40 bbl Hi-Vis Sweep surface to surface -120 spm ~ 653 gpm , 2723 psi -100k ROT ~ 110 RPM , 6.6k Torque -9.2 MWT. Monitor well "static" -Pump Dry Job Printed: 7/23/2008 2:28:44 PM B P Page 7 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 ~IRig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/31/2008 18:00 - 22:30 4.50 CASE N CEMT INT1 22:30 - 23:00 0.50 CASE N CEMT INT1 23:00 - 00:00 1.00 WHSUR N CEMT INT1 6/1/2008 00:00 - 02:30 2.50 WHSUR N CEMT INT1 02:30 - 03:30 ~ 1.00 ~ CASE N ~ CEMT ~ INT1 03:30 - 07:00 ~ 3.50 ~ CASE ~ N ~ CEMT ~ INT1 07:00 - 12:30 I 5.501 CASE I N I CEMT I INT1 12:30 - 13:00 0.50 CASE N CEMT INT1 13:00 - 16:30 3.50 CASE N CEMT INT1 16:30 - 17:30 1.00 CASE N CEMT INT1 17:30 - 19:00 1.50 CASE N CEMT INT1 19:00 - 23:00 I 4.00 CASE I N CEMT INTi 23:00 - 00:00 1.00 CASE N CEMT INT1 6/2/2008 00:00 - 02:15 2.25 CEMT N CEMT INT1 -Begin to trip out of the hole from 5591' to 108' -Up Wt. 140k Down Wt. 80k -No change in retums until after sweep passed over shakers then the returns stopped. Lay down BHA # 25 -Clean and clear floor Pull Wear ring and then install the test plug Change out Rams from 3 1/2" x 6" Vari to 7 5/8" -Test upper rams with test joint to 250 psi low / 3500 psi high -Good test Rig down test equipment and clear floor. -Rig up casing equipment and prepare to run 7 5/8" casing for the second time. -350 Ton Elevators, scaffolding, and casing tongs PU and RIH with 7-5/8" 29.7# L-80 BTC-M shoe track and check floats -holding. Continue PU and RIH with 7-518" 29.7# L-80 BTC-M casing to 1215', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 9,000 ft-Ibs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. Continue to PU and run 7 5/8" 29.7# L-80 Vam Top casing from 1215' to 2988'. -Torque Tumed to 14450 ft /Ibs and doped with Jet Lube Seal Guard. -Circulater for 5 minutes every 10 joints and record the up and down wt. -Up Wt. 120k Down Wt. 93k Circulate a bottoms up ~ 2988' -98 SPM ~ 291 gpm , 400 psi Continue in the hole with 7 5/8" Casing to 4230' -Up Wt. 175k Down Wt. 110k Stopped running casing in the hole in order to change out the cup on the franks tool. Also, took this time to clean the floor. Continued to run in the hole with 7 5/8" casing to 4430' -Circulated a bottoms up -98 spm ~ 291 gpm , 433k psi -Up Wt. 175k Down Wt. 110k Continue to run in the hole with 7 5/8" casing to 5552' -Rigged down franks tool and casing equipment -Made up landing joint to hanger and ran in hole and landed casing G~ 5582' Circulated 2 bottoms up in order to prepare for cement job. -Clean mud coming back over shakers -Up Wt. 210k Down Wt. 115k 7 5/8" Casing Cement Job -Pump 5 bbls of water ~ 5 bpm -Pressure test lines to 3500 psi -Pump 50 bbls of 12ppg Mud Push ~ 5 bpm -Drop Bottom Plug -Kick out plug with 82 bbls of 15.8 ppg cement -Drop top plug -Kick out plug with 5 bbls from Dowell ~ ~ BP Page 8 of 30 Operations Summary Raport Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/2/2008 00:00 - 02:15 2.25 CEMT N CEMT INT1 -Displace with 248 bbls from the rig pumps. -Plug bumped ®3440 strokes 02:15 - 02:45 0.50 CASE P INT1 Pressured up to 3500 psi to pressure test casing for 30 minutes -Good test 02:45 - 04:30 1.75 CEMT P INT1 Slowdown surface lines. Rig down cement head and lines. Laydown landing joint. Change out bales. 04:30 - 05:30 1.00 CASE P INT1 Set pack-off and test to 5000 psi for 10 minutes. Good Test 05:30 - 06:30 1.00 CASE P INT1 Rig up 2nd Kill line in order to perform injection test. -Pumped 10 spm for a total of 4 bbls ~ 440 psi 06:30 - 08:30 2.00 WHSUR P INT1 Change out rams from 7 5/8" to 3.5" x 6" Vari -Install test plug and make up 4" Test Joint -Test rams with the 4" test joint to 250 psi low / 3500 psi high -Good Test -Pull Test plug and test joint -Install 7" ID Wear Ring 08:30 - 09:30 1.00 CASE P INT1 Service Top Drive -Grease and adjust 09:30 - 13:00 3.50 DRILL P PROD1 Pick up BHA # 26. Load Nukes and then run in to 242' 13:00 - 14:00 1.00 DRILL P PROD1 Single in drill pipe from 242' to 1197' 14:00 - 14:30 0.50 DRILL P PROD1 Shallow test MWD ..Good test -118 spm ~ 290 gpm and 955 psi 14:30 - 17:30 3.00 DRILL P PROD1 Continue to single in the hole from 1197' to 3873' -Injecting 118 bbls of LSND mud down the OA -ICP 530 psi ~ .6 bpm -FCP 840 psi ~ 2 bpm 17:30 - 19:00 1.50 DRILL P PROD1 Continue to single into the hole from 3873' to 5302' -Rig up Little Red Hot Oil Services -Freeze Protect OV to 2500' MD with 100 bbls of dead crude -ICP 700 psi ~ .6 bpm -FCP 1500 psi ~ 2 bpm -SIP 600 psi 19:00 - 20:00 1.00 DRILL P PRODi Clean and clear rig floor -Lay down 3rd party tools (source box) 20:00 - 22:00 2.00 DRILL P PROD1 Cut and slip 85' of drilling line 22:00 - 23:00 1.00 DRILL P PROD1 Service top drive, adjust brakes, 23:00 - 00:00 1.00 DRILL P PROD1 Install TIW valve and IBOP and prepare for a stripping drill 6/3/2008 00:00 - 01:00 1.00 DRILL P PROD1 Meeting with crew to discuss upcoming stripping drill Perform stripping drill 01:00 - 03:30 2.50 DRILL P PROD1 Change out swivel packing on top drive 03:30 - 04:00 0.50 DRILL P PROD1 Pull up to retrieve IBOP and TIW out of string Test Swivel Packing 04:00 - 05:30 1.50 DRILL P PROD1 Displace from seawater to VersaPro MOBM 9.3 ppg -6.5 BPM ~ 1,848 psi, 15 RPM ~ initial 5.4 Kff/Ibs - fina13.1 KfUlbs. -Clean out pits and mud system 05:30 - 07:30 2.00 DRILL P PROD1 Wash down from 5,302'to 5,483', tag cement, Drill Shoe track and 20' of hole to 5,611' for FIT -Float collar on depth at 5,498' and shoe at 5,582' -6.5 BPM ~ 2,132 psi off, 2,370 psi on bottom, 30 RPM ~ 3.9 KfUlbs off, 4.3 KfUlbs on bottom -PUW 135, SOW 80, RWT 96K, WOB 5-10K 07:30 - 08:00 0.50 DRILL P PROD1 Circulate bottoms up and obtain slow pump rates Printed: 7/23/2008 2:28:44 PM ~ ~ BP Operations Summary Report Page 9 of 30 Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/3/2008 07:30 - 08:00 0.50 DRILL P PROD1 -6.8 BPM ~ 2,067 psi, 30 RPM ~ 3.2 KfUlbs 08:00 - 08:30 0.50 DRILL P PROD1 Pull back into the shoe at 5,498', Perform FIT to 11.5 ppg -TVD = 4,465' -MW = 9.3 -PSI = 520 08:30 - 12:00 3.50 DRILL P PROD1 Directional drill from 5,611' to 5,778', slide as need to land in OBb -7.3 BPM ~ 2,360 psi off, 2,454 psi on, 30 RPM ~ 3-4 Kftnbs on and off bottom -PUW = 136, SOW = 80K, RWT = 96K, WOB = 5-10K -Control drill <320'/hr, survey every 30' 12:00 - 00:00 12.00 DRILL P PROD1 Directional drill from 5,778' to 7,013', Geosteer as per Geologist -Billet tanget from 5,884' to 6,102' -7.3 BPM ~ 2,480 psi off, 2,560 psi on, 60 RPM ~ 4 Kft/Ibs off, 4.5 KfUlbs on bottom -PUW = 120, SOW = 80K, RWT = 91 K, WOB = 5K -Control drill <320'/hr, survey every 30' 6/4/2008 00:00 - 12:00 12.00 DRILL P PROD1 Directional drill from 7,013' to 8,055', Geosteer as per Geologist -7.3 BPM ~ 2,480 psi off, 2,645 psi on, 60 RPM ~ 5.5 Kf~lbs off, 6.0 KfUlbs on bottom -PUW = 123K, SOW = 61 K, RWT = 90K, WOB = 0-10K -survey every 30' 12:00 - 15:00 3.00 DRILL P PROD1 Directional drill from 8,055' to 8,504', Geosteer as per Geologist -7.3 BPM 6~ 2,600 psi off, 2,760 psi on, 60 RPM ~ 5.0 KfUlbs off, 6.5 KfUlbs on bottom -PUW = 121 K, SOW = 68K, RWT = 91 K, WOB = 5K -survey every 30' 15:00 - 15:30 0.50 DRILL P PROD1 Circulate as per Geologist -5.4 BPM ~ 1,572 psi -PUW = 117, SOW = 71 K 15:30 - 20:00 4.50 DRILL P PROD1 Directional drill from 8,504' to 8,953', Geosteer as per Geologist, TD at the end of the drillers polygon -7.3 BPM ~ 2,815 psi off, 2,910 psi on, 60 RPM ~ 6.4 Kftnbs off, 7.5 KfUlbs on bottom -PUW = 125K, SOW = 70K, RWT = 95K, WOB = 0-10K -survey every 30' 20:00 - 20:30 0.50 DRILL P PRODi Circulate 1 open hole volume -7.3 BPM ~ 2,770, 60 RPM ~ 6.5 KfUlbs -MW in 9.4, MW out 9.4 -Monitor Well, well static 20:30 - 00:00 3.50 DRILL P PROD1 Back ream out to MADD Pass and clean well bore from 8,953' to 8,245' -7.3 BPM ~ 2,650 psi, 60 RPM ~ 5.5 KfUlbs -Max 600'/hr for logging 6/5/2008 00:00 - 09:30 9.50 DRILL P PRODi Back ream out to MADD Pass and clean well bore from 8,245' to 5,580' -7.3 BPM ~ 2,150 psi -60 RPM ~ 4.4 Kft/Ibs -Max 600'/hr for logging, 300'/hr for caliper data from 6,003' to 5,793' sensor depth ~ ~ _gp Page 10 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/5/2008 00:00 - 09:30 9.50 DRILL P 09:30 - 11:00 1.50 DRILL P 11:00 - 12:00 1.00 DRILL P 12:00 - 14:30 2.50 DRILL P 14:30 - 15:30 I 1.001 DRILL I P 15:30 - 16:30 I 1.001 DRILL I P 16:30 - 23:00 I 6.501 DRILL I P 23:00 - 00:00 I 1.001 DRILL I P 16/6/2008 00:00 - 02:00 2.00 I DRILL I P 02:00 - 03:30 I 1.501 CASE P 03:30 - 09:00 I 5.501 CASE I P 09:00 - 12:30 3.50 CASE P 12:30 - 16:00 3.50 CASE P 16:00 - 16:30 0.50 CASE P 16:30 - 18:30 2.00 DRILL P 18:30 - 19:30 1.00 DRILL P 19:30 - 23:00 3.50 DRILL P 23:00 - 00:00 I 1.001 DRILL I P PROD1 Work through tight spots at 6,340' and 6,080' PROD1 Circulate bottoms up at the shoe, substantial increase in cuttings, took 3 bottoms up to clean up casing. -7.3 BPM ~ 2,150 psi -60 RPM ~ 4.5 KfUlbs PROD1 Service top drive and adjust draw works linkage ~ PROD1 Run in the hole from 5,580' to 8,901', no problems running in hole PROD1 Wash down from 8,901' to 8,953', circulate bottoms up prior to fluid swap -6.8 BPM ~ 2,526 psi -60 RPM ~ 5.3 KfUlbs PROD1 Displace well bore from VersaPro LS to VersaPro SF -6.8 BPM ~ 2,000 psi -60 RPM ~ 5.3 Kft/Ibs -MW in 9.4 ppg, MW out 9.4 ppg -Perform Slow Pump Rates PROD1 Monitor well, well static. Putl 5 stands, no over pull or swabbing. Pump dry job and pull out of hole from 8,953' to 242', no problems pull out of hole. PROD1 PJSM on handling BHA and Source. Lay down jars, rack back collar stand, and pull source. PROD1 Continue laying down remaining BHA. -Bit 0-0 in gauge RUNPRD PJSM for running liner Rig up to run 4 1/2" liner, Swell Packer, and Aluminum Billet RUNPRD Run in hole with 4 1/2" liner (OBb Lateral) to 3,142' -IBT made up to mark, avg torque 2,800 fUlbs, use BOL 2000 dope -1 Joint 4 1/2" L-80 12.6# IBT Solid Liner with Shoe -63 Joints 4 1/2" L-80 12.6# IBT Slotted Liner, 1 centralizer per joint, free floating -12 Joints 4 1/2" L-80 12.6# IBT Solid Liner, 1 centralizer per joint on joints 1-11, free floating -3 Space out Pup joints 4 1/2" L-80 12.6# IBT Pups -1 Swell Packer assembly with Hydro Form Centralizer below Packer -20' Aluminum Billet with IBT Pup on bottom RUNPRD Run in the hole with 4 1/2" liner on 4" drill pipe out of derrick from 3,142'to 8,953' -PUW = 141 K, SOW = 78K -Pump 3.5 BPM fB~ 881 psi to release from liner, top of billet at 5,813', shoe at 8,953' RUNPRD Pull out of the hole from 5,813'. RUNPRD Lay down Weatherford GS Spear and clean rig floor. PROD2 Make up BHA #27 as per Directional Driller -Rerun bit from BHA #26 -Load source -Run in hole 2 stands and stab safety valve PROD2 Rig Evacuation Drill PROD2 Run in hole with 4" drill pipe out of derrick from 478' to 5,534'. -Shallow hole test MWD at 1,147', good test PROD2 Waiting on mud sent to MI for centrifuging. Printed: 7/23/2008 2:28:44 PM g p Page 11 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/7/2008 00:00 - 01:30 1.50 DRILL N PROD2 Waiting on mud for Displacement from VersaPro SF to VersaPro LS. NPT due to the availability of trucks. Waited 7 hrs on guzzler to empty cuttings box at MI mud plant. Also the efficiency that the rig ran the slotted liner did not allow sufficient time to recondition the MOBM. -New Crew watched oil base mud safety video. 01:30 - 02:30 1.00 DRILL P PROD2 Run in hole from 5,534' to 5,813', Tag billet at 5,818' 02:30 - 03:30 1.00 DRILL P PROD2 Displace wellbore from 9.4 ppg VersaPro SF to 9.3 ppg VersaPro LS -260 GPM ~ initial 1,840 psi, final 1,630 psi -Trench while displacing wellbore, from 5,798' to 5,818' -Motor stalls everytime billet is tagged 03:30 - 06:30 3.00 DRILL P PROD2 Time drill for open hole sidetrack from 5,818' to 5,828' -Estimate 1' of billet drilled before sidetracking -260 GPM ~ 1,630 psi 06:30 - 08:00 1.50 DRILL P PROD2 Dress up trench and open hole sidetrack area -Slide up and down multiple times without rotation, no sign of billet -300 GPM ~ 2,220 psi ', 08:00 - 12:00 4.00 DRILL P PROD2 Directional drill from 5,828' to 6,204', Geosteer as per Geologist, base of OBc at 6,420' -survey every 30' -Back ream 60' -Control drill <300'/hr -305 GPM ®2,290 psi off, 2,510 psi on -60 RPM ®4.5 Kff/Ibs off, 5.6 Kffnbs on -PUW = 121 K, SOW = 76K, RWT = 94K, WOB = 0-20K 12:00 - 00:00 12.00 DRILL P PROD2 Directional drill from 6,204' to 7,210', Geosteer as per Geologist in OBc lateral -survey every 30' Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,540 psi off, 2,585 psi on -60 RPM ~ 5.9 KfUlbs off, 6.2 KfUlbs on -PUW = 135K, SOW = 75K, RWT = 95K, WOB = 0-20K 6/8/2008 00:00 - 12:00 12.00 DRILL P PROD2 Directional drill from 7,210' to 8,574', Geosteer as per Geologist in OBc lateral, silty at the top and concretions at the bottom, looking for good sand -survey every 30' -Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,530 psi off, 2,660 psi on -60 RPM ®6.1 KfUlbs off, 7.2 Kft/Ibs on -PUW = 135K, SOW = 70K, RWT = 95K, WOB = 0-10K 12:00 - 15:00 3.00 DRILL P PROD2 Directional drill from 8,574' to 8,990', Geosteer as per Geologist in OBc lateral, TD at the end of the Drillers. polygon -survey every 30' -Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,600 psi off, 2,900 psi on -60 RPM ~ 6.3 KfUlbs off, 7.3 Kffnbs on -PUW = 145K, SOW = 70K, RWT = 95K, WOB = 0-10K 15:00 - 15:30 0.50 DRILL P PROD2 Circulate one open hole volume rnntea: irtuzuuts cza:aa rnn gp Page 12 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To i Hours Task Code NPT "Phase 6/8/2008 15:00 - 15:30 0.50 DRILL P PROD2 15:30 - 00:00 8.501 DRILL I P PROD2 16/9/2008 100:00 - 03:00 3.00 I DRILL P PROD2 03:00 - 04:00 I 1.001 DRILL I P I I PROD2 04:00 - 05:00 I 1.001 DRILL I P I I PROD2 05:00 - 08:00 I 3.001 DRILL I P I I PROD2 08:00 - 11:00 3.00 DRILL P PROD2 11:00 - 12:30 1.50 DRILL P PROD2 12:30 - 13:00 0.50 DRILL P PROD2 13:00 - 13:30 0.50 DRILL P PROD2 13:30 - 16:30 3.00 DRILL P PROD2 16:30 - 18:00 I 1.501 DRILL I P I I PROD2 18:00 - 21:00 3.001 DRILL I P PROD2 21:00 - 22:00 I 1.001 DRILL I P I I PROD2 Description of Operations -300 GPM ~ 2,730 psi -60 RPM ~ 6.2 Kft/Ibs Back ream to clean well bore and MADD Pass for logs from 8,990' to 6,864' -600 FPH max -300 GPM ~ 2,485 psi -60 RPM ®5.6 Kft/Ibs Continue Back reaming to clean well bore and MADD Pass for logs from 6,884' to 5,928' keeping top stabilizer 25' below billet. No problems while back reaming. -600 FPH max, 300 FPH from 6,100' to 5,928' for caliper data over packer area. -300 GPM ~ 2,298 psi -60 RPM ~ 5.6 Kftnbs Pull out of hole from 5,928' to 5,813', saw a 20K over pull on weight indicator, stop and try to go back down past 5,813'. Stack 15K but could not get past 5,813', pull up above billet and pump to check orientation of motor, motor oriented low side, shut down pumps and attempt to run in past 5,813' with no success. Pull out to the shoe at 5,583' without rotation or pumps. Circulate until shakers clean up, took 3 bottoms up. -300 GPM ~ 2,400 psi Service top drive, change out quill, change out dies in grabber, and adjust draw works brake. -Monitor well, well static Pump dry job and pull out of hole. Lay down BHA #27 as per Directional Driller Clear rig floor and bring up components for BHA #28 Make up clean out BHA #28 with mill for dressing billet area. Run in hole to shoe, ease out into open hole and tag up twice on cuttings beds. Had to wash down with rotation from 5,760' to 5,765'. Shut down pumps and attempt to slide past billet, taking weight at 5,815', pick up and wash down past billet to 5,830' without rotation. Rotate and pump to dress from 5,815' to 5,828' with watermellon mill. -200 GPM ~ 730 psi -60 RPM ~ 5.6K -PUW = 125K, SOW = 80K, RWT = 95K -Shut down pumps and work through billet area dry with no problems three times. -No metal debris in bottoms up. Decide to run to bottom and perform displacement. Appears mill is pushing something ahead of it, wedged at 7,325'. Tried to circulate down with no success, took rotation and 25 Klbs to get obstruction moving again. Run in hole taking weight intermittently. Circulate bottoms up prior to displacing wellbore to SFMOBM -400 GPM ~ 3,100 psi -60 RPM ~ 5.6 Kft/Ibs -Reciprcate pipe 70' -Shakers clean after 1 bottoms up. Printed: 7/23/2008 2:28:44 PM ~ ~ gp Page 13 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/9/2008 22:00 - 00:00 2.00 DRILL P PROD2 Displace wellbore from 9.3 ppg VersaPro LS to 9.3 ppg VersaPro SF -400 GPM ~ 3050 psi -60 RPM ~ 6.0 Kft/Ibs -Reciprocate Pipe 70' -MW in 9.3 ppg, MW out 9.3 ppg 6/10/2008 00:00 - 02:30 2.50 DRILL P PROD2 Pull out of hole from 8,990' to 5,835' without any problems. 02:30 - 03:00 0.50 DRILL P PROD2 Pump out from billet at 5,835' to shoe at 5,583'. -301 GPM ~ 1,474 psi. 03:00 - 03:30 0.50 DRILL P PROD2 Circulate bottoms up at the shoe -414 GPM ~ 2,306 psi -MW in 9.3 ppg, MW out 9.3 ppg 03:30 - 05:30 2.00 DRILL P PROD2 Monitor well, well static -Pull out of hole from 5,583' to BHA 05:30 - 06:00 0.50 DRILL P PROD2 Lay down BHA #28 06:00 - 06:30 0.50 DRILL P PROD2 Clean and clear rig floor. 06:30 - 07:00 0.50 CASE P RUNPRD Rig up to run 4.5" Slotted/Solid Liner for OBc Lateral. 07:00 - 07:30 0.50 CASE P RUNPRD H2S Drill with all rig personnel and contractors on location. 07:30 - 12:00 4.50 CASE P RUNPRD PJSM. RIH with 4.5" 12.6# L-80 IBT siotted/solid Liner to 3215'. -Ave TO = 2800 tt-Ibs 12:00 - 12:30 0.50 CASE P RUNPRD Make up GS Spear and insert into Aluminum Billet. -Make up Billet to liner and RIH. 12:30 - 17:30 5.00 CASE P RUNPRD RIH with 4.5" liner on 4" DP. -145k Up Wt, 75k Dn Wt. 17:30 - 18:00 0.50 CASE P RUNPRD Tag bottom ~ 8890'. -Pick up 5' for pipe stretch and pump ~ 4 bpm, 1100 psi to release aluminum billet ~ 5751'. -Good indication that spear released from billet - 125k Up, 75k Dn. 18:00 - 22:00 4.00 CASE P RUNPRD POH to shoe ~ 5580'. -CBU ~ 250 gpm, 2100 psi. -Pump dry job and POH to surface. -Lay down GS Spear. ~' 22:00 - 22:30 0.50 CASE P RUNPRD Clean and clear rig floor. 22:30 - 00:00 1.50 BOPSU P PROD3 PJSM. Drain stack and pull wear ring. -Flush the stack with Johnny Whacker, then drain stack. -Rig up 4" Test Joint and plug for BOP test. 6/11/2008 00:00 - 00:30 0.50 BOPSU P PROD3 Continue rigging up to test ROPE. 00:30 - 06:00 5.50 BOPSU P PROD3 Test ROPE. -Test all BOP related equipment to 250 psi tow / 3500 psi high. -Test lower 2-7/8" x 5" VBR, upper 3-1/2" x 6" VBR, and Annular with 4" test joint to 250 psi low /3500 psi high. -Test lower and upper rams with 4.5" test joint 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Lou Grimaldi. Test Witnessed by WSL Mark Staudinger and NTP Roy Hunt. 06:00 - 07:00 1.00 BOPSU P PROD3 Rig down and blown down all testing equipment. -Pull test plug and install wear ring. 07:00 - 09:00 2.00 DRILL P PROD3 Make up Drilling BHA #29 as per Directional Driller. -RIH with Flex Drill Collars and Jars to 287'. 09:00 - 09:30 0.50 DRILL P PROD3 RIH with BHA #29 to 1717'. 09:30 - 10:00 0.50 DRILL P PROD3 Shallow test MWD w/291 gpm, 1699 psi -good. 10:00 - 12:30 2.50 DRILL P PROD3 RIH with from 1717' to 5537'. rnmea: nz:vzuuo cza:~w rm gp Page 14 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/11/2008 10:00 - 12:30 2.50 DRILL P PROD3 -115k Up Wt, 87k Dn Wt. 12:30 - 14:00 1.50 DRILL P PROD3 Slip and cut 87' of drilling line. -Service top drive, crown, and drawworks brake linkage. 14:00 - 15:00 1.00 DRILL P PROD3 Make up top drive and displace from 9.3 ppg Solids Free Oil Based Mud to 9.3 ppg Low Solids OBM. -Displace ~ 300 gpm, 2620 psi, 60 RPM, 4.2k ft-Ibs TO. 15:00 - 00:00 9.00 DRILL P PROD3 Trench Aluminum Billet from 5751' to 5791'. Directional Drill ahead from 5791' to 6394'. -300 gpm ~ 2400 psi on / 2150 psi off -60 RPM with 6.2k ft-Ibs TO on / 6.Ok ft-Ibs TO off -WOB = 5-10k -125k Up Wt, 80k Dn Wt, 95k Rot Wt -Survey every 30' and backream 60' on connections. 6/12/2008 00:00 - 12:00 12.00 DRILL P PROD3 Continue directional drilling in OBd lateral from 6394' to 7780'. -Pumps ~ 300 gpm, 2734 psi on, 2620 psi off. -Rotary ®60 rpm with 6.9k ft-Ibs TO on, 6k ft-Ibs TQ off. -WOB = 5-10k lbs. -125k Up Wt, 65k Dn Wt, 90k Rot Wt -Survey every 30', Backream 60' on connections. -MW in and out = 9.3 ppg. 12:00 - 23:30 11.50 DRILL P PROD3 Continue directional drilling in OBd lateral to TD ~ 8965' MD (4482' TVD). -Pumps ~ 300 gpm, 2800 psi on, 2750 psi off -Rotary ~ 60 rpm with 6.8k ft-Ibs TO on, 6.3k ft-Ibs TO off. -WOB = 5-10k lbs. -145k Up Wt, 75k Dn Wt, 95k Rot Wt -Survey every 30', Backream 60' on connections. -MW in and out = 9.4 ppg. 23:30 - 00:00 0.50 DRILL P PROD3 CBU ~ 300 gpm, 2730 psi. -60 rpm ~ 6.4k ft-Ibs TO. 6/13/2008 00:00 - 00:30 0.50 DRILL P PROD3 CBU ~ 300 gpm, 2730 psi. -60 RPM ®6.4k ft-Ibs TO 00:30 - 12:00 11.50 DRILL P PROD3 Backream and MAD Pass from 8965' to 5863' at 600 fph. -MAD Pass ~ 300 fph for Density Data as per Geologist (8131' to 8031', 7631' to 7531', and 5963' to 5863') -300 gpm ~ 2500 psi. -60 rpm ~ 6k ft-Ibs TO -143k Up Wt, 69k Dn Wt, 95k Rot Wt -Pull inside shoe ~ 5580' 12:00 - 13:00 1.00 DRILL P PROD3 CBU X2 ~ 310 gpm, 2200 psi. -Rotate ~ 60 rpm, 4.4k ft-Ibs TO -Reciprocate pipe 90' strokes. -145k Up Wt, 90k Dn Wt, 95k Rot Wt 13:00 - 13:30 0.50 DRILL P PROD3 Service Top Drive -Grease Wash Pipe 13:30 - 14:30 1.00 DRILL P PROD3 Orient Bit 140 degrees left, RIH and work past billet ~ 5751'. -Did not hang up while RIH through billet and saw slight bobble on weight indicator while POH past billet. -Continue to RIH from 5880' to 6490'. -145k Up Wt, 75k Dn Wt -While RIH, Bearings failed on Electric Emalgo Brake. 14:30 - 15:00 0.50 DRILL N RREP PROD3 POH inside shoe to 5531' -Circulate across top of hole 15:00 - 00:00 9.00 DRILL N RREP PROD3 Prepare to remove and repair Emalgo Brake (Dyno-matic). Printed: 7/23/2008 2:28:44 PM gp Page 15 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT 6/13/2008 15:00 - 00:00 9.00 DRILL N RREP PRODS 6/14/2008 00:00 - 12:00 12.00 DRILL N RREP P RODS 12:00 - 00:00 12.00 DRILL N RREP P RODS 6/15/2008 00:00 - 09:00 9.00 DRILL N RREP P RODS 09:00 - 16:30 7.50 DRILL N RREP P RODS 16:30 - 17:30 1.00 DRILL N RREP P RODS 17:30 - 18:00 0.50 DRILL N RREP P RODS 18:00 - 19:30 1.50 DRILL P P RODS 19:30 - 20:00 0.50 DRILL P P RODS 20:00 - 22:00 2.00 DRILL P P RODS 22:00 - 00:00 2.00 DRILL P P RODS 6/16/2008 00:00 - 00:30 0.50 DRILL P P RODS 00:30 - 03:30 3.00 DRILL P P RODS 03:30 - 06:00 2.50 DRILL P P RODS 06:00 - 06:30 0.50 DRILL P P RODS 06:30 - 08:00 1.50 CASE P R UNPRD 08:00 - 12:00 4.00 CASE P R UNPRD Spud Date: 4/27/2008 Start: 5/21 /2008 End: 7/8/2008 Rig Release: 7/8/2008 Rig Number: Phase Description of Operations -Spot Peak Crane Crew next to beaver slide. -Hold PJSM with Rig Crew, Pad Operator Dave Kindred, BP Safety Rep Allen Graff, WSL Mark Staudinger, NAD Safety Rep Mark Mosbrucker, NTP Brian Tiedemann, and Peak Crane Crew Dan Abila and Barry Meek for the critical lift (Blind Lift) -Pick Emalgo Brake out of Drawworks and place in shop to replace bearings. Work on Emalgo Brake in Shop and found that bearings had welded to shaft. -Send Emalgo Brake to NOC Yard in Deadhorse for rebuild -Wait on replacement shaft and bearings -Clean and service top drive, housekeeping, clean inside drawworks, and change out leaking O-rings for top drive grabber while waiting. Continue to wait on repair of Emalgo Brake ~ NOC Yard. -Replacement shaft shipped up from town. -Continue to service, clean, and organize rig while waiting. -CBU x1 ~ 2 bpm, 340 psi. Continue to Wait on Repairs to Emalgo Brake in NOC Yard. -Continue to service, clean, and organize rig. Crane and rebuilt Emalgo Brake arrived on location. -Spot crane and prep for critical lift (blind lift). -Hold PJSM with Pad Operator Dan Dacs, BP and NAD Safety Reps (Allen Graff and Mark Mosbrucker), WSL Tom Anglen, NTP Kelly Cozby, Peak Crane Crew, and Rig Crew. -Pick and install Emalgo Brake into Drawworks. -Function test all brakes - ok. Make up Top Drive and place bit outside of shoe ~ 5900'. -CBU x1 ~ 300 gpm, 2300 psi. -Orient bit ~ 140 degrees. RIH slick from 5580' to 6100'. Continue to RIH slick to TD ~ 8965'. Make up top drive and wash last stand to bottom. -CBU x1 ~ 300 gpm, 2800 psi. -Rotate ®70 rpm, 5.2k ft-Ibs TO. -Reciprocate pipe 30' strokes. Displace well to 9.3 ppg SFMOBM ~ 300 gpm, 2900 psi. -Rotate ~ 70 rpm, 6.1 k ft-Ibs TO. -Reciprocate pipe 95' strokes -145k Up Wt, 85k Dn Wt, 95k Rot Wt. -Monitor Well -Static. Pump dry job and POH from 8965' to 6299'. -130k Up Wt, 80k Dn Wt. Continue to POH slick from 6299' to shoe ®5582'. -Ran slow past billet ~ 5751' -good. -Monitor well ~ shoe -static. Continue to POH from 5582' to 229'. PJSM. Lay down BHA #29. Clean and clear rig floor. Rig up to run 4.5" OBd Lateral Liner. RIH with 4-1/2" 12.6# L-80 Slotted BTC /Solid IBT Liner as per running detail to 1141'. PrinlBd: 7/Z3/2008 2:28:44 PM ~r s BP Page 16 of 30 ~, Operations Summary :Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date I From - To I Hours I Task I Code I NPT Spud Date: 4/27/2008 Start: 5/21/2008 End: 7/8/2008 I Rig Release: 7/8/2008 Rig Number: Phase Description of Operations 16/16/2008 108:00 - 12:00 I 4.001 CASE I P 12:00 - 16:30 I 4.501 CASE I P 16:30 - 17:00 0.50 CASE P 17:00 - 22:30 5.50 CASE P 22:30 - 00:00 I 1.501 CASE I P 16/17/2008 100:00 - 01:00 I 1.001 CASE I P 01:00 - 03:00 I 2.00 I CASE I P 03:00 - 04:00 1.00 CASE P 04:00 - 06:30 2.50 EVAL P 06:30 - 09:00 I 2.501 EVAL I P 09:00 - 09:30 0.50 EVAL P 09:30 - 10:30 1.00 EVAL P 10:30 - 14:30 I 4.001 STWHIPI P 14:30 - 16:30 I 2.001 STWHIPI P RUNPRD -Use BOL 2000 Dope. Ave TO = 2800 ft-Ibs. -RIH ~ 90 fpm RUNPRD Continue to RIH with 4-1/2" 12.6" L-80 Slotted/Solid and 13Cr-80 Vam Top Liner as per detail to 3872'. -Reduce running speed to 60 fpm due to mud flowing up Liner. -Use BOL 2000 dope on BTC/IBT and Jet Lube Seal Gaurd on Vam Top -TO BTC/IBT to 2800 ft-Ibs. TO Vam Top to 4440 ft-Ibs. TO Hydril 563 to 6000 ft-Ibs. -Obtain PU and SO Wts every 25 joints. -Make up hanger and Liner Top Packer as per BOT Rep. -Liner Up Wt = 80k, Dn Wt = 70k. RUNPRD Rig down liner running equipment. RUNPRD Continue to RIH w/ 4.5" Liner on 4" DP from derrick ~ 60 fpm -Obtain PU and SO Wts every 10 stands. -110k Up Wt, 85k Dn Wt ~ 7-5/8" Shoe (5582') -RIH and tag bottom ~ 8965'. Pick up pipe strech + 9' to position liner in place. -150k Up Wt, 60k Dn Wt ~ TD. RUNPRD Drop 1.75" Ball and pump down ~ 4 bpm. Slow to 2 bpm and bump ball on seat. -Pressure up to 1700 psi to set liner hanger and slack off 20k to confirm set -good. -Bleed off and pressure back up to 4000 psi to set Liner Top Packer. -Bleed off to release the running tool from packer. -Pick up 1', close rams, and pressure up backside to 2000 psi for 5 minutes to check LTP -good test. -Pick up and expose dog subs above LTP. Slack off and locate LTP ~ 5101' DPM. RUNPRD CBU xi ~ 4 bpm, 500 psi. Monitor Well -Static. RUNPRD Pump Dry Job and POH from 5101' to Liner Running Tool, racking back 4" DP and HWDP. RUNPRD Lay down Liner Running Tools. Clean and clear rig floor. INT1 PJSM with SWS crew and rig crew. Spot and Rig up SLB Wireline Unit. -Make up USIT logging tools and function test - OK INT1 Log with USIT from 5090' to surface -TOC ~ 3670' -Cement stringers to 3028' INT1 Rig down logging tools and service top drive and crown. INT1 Clean and clear floor and prepare for running whipstock and mill assembly WEXIT PJSM, with Baker Rep, Schlumberger Crew, NAD Rig Crew, BP WSL Tom Anglen, and NAD Toolpusher Kelly Cozby -Make up and run in hole with Whipstock and Mill assembly to 842' -BHA made up to Baker and Schlumberger specifications. WEXIT RIH from 842'to 1100' -Shallow tested tools ~ 240 gpm , 830 psi -Good Test -Continued to RIH from 1100' to 5002' ~ 60 fUmin. -Orient whipstock ~ -28 deg. left with TOW ~ 5002' Printed: 7/23/2008 2:28:44 PM ~ ~ gp Page 17 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/17/2008 116:30 - 17:00 I 0.501 STWHIPI P 17:00 - 17:30 0.50 STWHIP P 17:30 - 00:00 6.50 STWHIP P 16/18/2008 100:00 - 03:00 3.00 I STWHIPI P 03:00 - 04:30 1.501 STWHIPI P 04:00 - 07:00 I 3.001 STWHIP~ P 07:00 - 09:00 I 2.001 STWHIP P 09:00 - 10:30 1.501 STWHIP P 10:30 - 12:00 1.501 STWHIP P 12:00 - 13:00 I 1.001 STWHIPI P 13:00 - 16:30 I 3.501 STWHIPI P 16:30 - 00:00 7.50 ~ DRILL I P WEXIT Make up pipe to top drive and fill pipe ~ 260 gpm, 1500 psi -Up Wt. 135k /Down Wt. 35k -Oriented to -28 deg left -Slack off 15k to shear anchor -Pick up 10k over and slack off 40k to shear bolt and find neutral point WEXIT Displace to 9.3 ppg oil base mud ~ 300 gpm , 1835 psi WEXIT Begin to mill with TOW f~ 5002' -122 spm ~ 300 gpm, 1720 psi -80 RPM -Torque 5.6k WEXIT Continue to mill from 5015'to 5040' -132 spm ®323 gpm, 1846 psi -100 RPM -Torque 5k -Worked and wiped pipe past window with no snags -TOW 5002' /BOW 5015' WEXIT Circulate 2x bottoms up -Pump 50 bbl Super Sweep and circulated out -130 spm X320 gpm , 1820 psi -Returns did not increase and metal shavings were still minimal after sweep was circulated out -Monitored well -Static -Mud Wt In 9.1 ppg / Out 9.1 ppg WEXIT Pull out of hole from 5040' to 472'. -Up Wt. 118k /Down Wt. 98k -Mud Wt. In 9.3ppg /Out 9.3 ppg WEXIT Stand back 43/4" Drill Collars -Laydown the milling assembly -Upper Mill was in Gauge -Clean and clear floor WEXIT Pulled the wear ring and flushed out the stack. -Replaced the wear ring WEXIT Picked up BHA # 31 and began to run in hole BHA # 31 -6 3/4" Hyclog DSX146H -AIM PDM -Bypass Sub -Float -MWD -NM Flex Drill Collars -Hydraulic Jars -HWDP WEXIT PJSM, with Schlumberger and NAD Rig Crew about radioactive sources -Continued to M/U BHA # 31 as per Schlumberger WEXIT Run in hole to 1100' -Shallow tested MWD -Good Test -Continued to Run in hole to 4942', oriented bit and worked through window.-No problems -Reamed from 5002' to 5025' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 5040' to 5634' rnrneuc ncwa~o cw.rv rm • gp Page 18 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task j Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 16/18/2008 116:30 - 00:00 I 7.501 DRILL I P 16/19/2008 100:00 - 12:00 12.00 I DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 16/20/2008 100:00 - 10:30 I 10.501 DRILL I P 10:30 - 11:30 I 1.001 DRILL I P 11:30 - 12:00 I 0.501 DRILL P 12:00 - 16:30 I 4.50 I DRILL I P 16:30 - 17:30 1.001 DRILL P Phase Description of Operations PROD4 - 125 spm ~ 300 gpm , 2300 psi on / 2200 psi off -Torque 4.6k on / 4.2k off -WOB 0-5k -Up Wt. 120k /Down Wt. 75k /ROT Wt. 95k -Back Reamed 30' on every connection PROD4 Drill from 5634' to 6490' - 121 spm ~ 300 gpm , 2335 psi on / 2260 psi off -Torque 5.5k on / 5k off -WOB 5-10k -Up Wt. 111 k /Down Wt. 75k / ROT Wt. 90k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 6490' to 7719' - 125 spm ~ 300 gpm , 2340 psi on / 2200 psi off -Torque 6.5k on / 6.2k off -WOB 0-10k -Up Wt. 130k /Down Wt. 65k /ROT Wt. 93k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 7719' to 8850' - 123 spm ~ 300 gpm , 2712 psi on / 2579 psi off -Torque 6.1 k on / 5.9k off -WOB 0-10k -Up Wt. 119k /Down Wt. 65k /ROT Wt. 89k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg -TD called ~ 8850' MD , 4314' TVD as per Geologist PROD4 Circulate and condition as per geologist for gas sample -123 spm ~ 300 gpm , 2599 psi -Torque 5.9k -RPM 60 -Monitor Well -static -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 MAD Pass from 8850' to 8760' -123 spm ~ 300 gpm , 2590 psi , 600 fph -Torque 5.3k -RPM 60 PROD4 MAD Pass from 8760' to 8046' -123 spm ~ 300 gpm , 2590 psi , 600 fph -Torque 5.6k -RPM 60 -Reduced running speed to 300 fph from 8046' to 7856' -Increased ann. pressure of 50-120 psi -Made 3 attempts ~ 7640' to ream with no success PROD4 Pumped 20 bbl hi-vis sweep -125 psm ~ 303 gpm , 2430 psi -Torque 5.3k -RPM 80 -Worked pipe from 7640' to 7700' -No increase in returns from hi-vis sweep Printed: 7/23/2008 2:28:44 PM BP Page 19 of 30 i Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 16/20/2008 17:30 - 00:00 I 6.501 DRILL P 16/21/2008 100:00 - 08:30 I 8.501 DRILL I P 08:30 - 10:00 I 1.501 DRILL ~ P 10:00 - 12:00 I 2.00 I DRILL I P 12:00 - 13:30 I 1.50 I DRILL I P 13:30 - 15:00 1.50 DRILL P 15:00 - 16:00 1.00 DRILL P 16:00 - 17:00 1.001 DRILL ~ P 17:00 - 22:00 I 5.00 I DRILL I P 22:00 - 00:00 2.001 DRILL I P 6/22/2008 100:00 - 00:30 ~ 0.501 DRILL I P 00:30 - 01:00 0.501 DRILL I P 01:00-02:00 I 1.OOIWHIP IP Phase Description of Operations PROD4 -MAD Pass from 7640' to 6670' -123 spm ~ 301 gpm , 2340 psi , 50-200 fph -Torque 5.7k -RPM 80 -Annulus continues to show signs of packoff and increase in psi -Worked and reamed pipe -Reamed clean from 7505' to 6769' with 1 tight spot ~ 7000' PROD4 -MAD Pass from 6769' to 5700' -123 spm ~ 301 gpm , 1930 psi , 300 fph -Torque 5k -RPM 60 / ROT 105k -From 5700' to 5045' no rotation -Had to work the pipe ~ 5400' due to tight spot -Continued to pull from 5045' to 4969' -Did not pump while pulling through window with no problems PROD4 Circulated 3 bottoms up ~ 4969' to clean up the hole -122 spm ~ 299 gpm , 1930 psi -Monitored well- static PROD4 Slip and cut 91' of drilling line -Serviced top drive, drawworks, and rotary table PROD4 Ran back in hole from 4969' to 5538' -Up Wt. 113k /Down Wt. 88k -MAD Pass from 5538' to 5422' without rotating -123 spm ~ 300 gpm , 2106 psi PROD4 Ran in hole from 5422' to 8763' PROD4 Fill pipe and washed to bottom from 8763' to 8850' -Ciculated a bottoms up -123 spm ~ 300 gpm , 2696 psi -RPM 80 Torque 5-6k PROD4 Displace mud system from 9.3 ppg LS MOBM to 9.2 ppg SF MOBM -123 spm ~ 300 gpm , 2726 psi -RPM 80 -Torque 6.4k PROD4 Monitor Well -Static -Pumped dry job -Began to pull out of the hole from 8850' to 4969' -Up Wt. 132k /Down Wt. 74k -Monitored well ~ window -static -Continued to pull from 4969' to 288' -Mud Wt. In 9.2 ppg /Out 9.2 ppg PROD4 Laydown BHA # 31 -Stand back Jars -PJSM with Schlumberger,NAD Rig Crew, NAD Tourpusher, and BP WSL about removal of Radioactive Sources. -Laydown Flex Collars PROD4 Finish laying down BHA # 31 -Bit was in gauge and in good condition PROD4 Clean and clear floor of Schlumberger tools and prepare to run Whipstock Retrieval tool RUNPRD Pick up BHA # 32 and run in hole to 381' PflMetl: 723/ZWtl t:"Ltl:44 PM • gp Page 20 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/22/2008 01:00 - 02:00 1.00 WHIP P RUNPRD -Whipstock Retrieval Tool -Magnet -HWDP -Float Sub -MWD -Bumper Sub -Jars -Drill Collars -Cross Over 02:00 - 05:00 3.00 WHIP P RUNPRD Run in hole from 381' to 4980' -Up Wt. 115k /Down Wt. 85k -Oriented Whipstock Retrieval Tool -Ran in from 4980' to 5010' -Indicator of hooking whipstock ~ 5007' -Up Wt. 125k /Down Wt. 85k -Over pull of 95k to release bottom trip anchor -Pull out of the hole to 4966' 05:00 - 06:00 1.00 WHIP P RUNPRD Circulate 2 bottoms up ~ 4966' -119 spm ~ 291 gpm , 1605 psi -Pump Dry Job -Monitor Well- static -Mud Wt. In 9.3 ppg /Out 9.3 ppg 06:00 - 09:00 3.00 WHIP P RUNPRD Pull out of the hole from 4966' to 107' -Racked back the Drill Collars 09:00 - 11:00 2.00 WHIP P RUNPRD Continue to laydown the Whipstock Retrieval BHA -Whipstock showed wear of tracking right at the bottom, but was in good condition. Mill followed whipstock to the bottom for a full length window. -Debris found on magnet no more than 1 cup 11:00 - 12:30 1.50 WHIP P RUNPRD Layed down Baker tools ,clean and cleared the rig floor 12:30 - 13:30 1.00 CASE P RUNPRD Rig up to run 4 1/2" slotted /solid liner 13:30 - 21:00 7.50 CASE P RUNPRD PJSM, with NAD Rig Crew, Baker Rep., NAD Casing Crew -Make up 12.6# L-80 IBT/BTC slotted and solid liner with swell packers to the recommended torque of 3500 ft/Ibs using BOL 2000NM -Up Wt. 80k /Down Wt. 70k -Circulated 13 spm ~ 31 gpm , 86 psi 21:00 - 21:30 0.50 CASE P RUNPRD Rig down 4 1/2" liner running tools 21:30 - 22:30 1.00 CASE P RUNPRD Run 4 1/2" liner in on 4" drill pipe from 3850' to 4968' 22:30 - 00:00 1.50 CASE P RUNPRD Obtain Parameters for running bent joint into open hole -Up Wt 100k /Down Wt. 85k -Tagged No-Go at 5120' when attempting to exit window -Attempted 3 times 6/23/2008 00:00 - 00:30 0.50 CASE P RUNPRD Tagged No-Go ~ 5120' -Picked up to window and rotated the drillstring 13/4 turns -Went through window ~ 5015' -Continued to run in hole ~ 60 fph -Up Wt. 100k /Down Wt. 85k ~~ 00:30 - 04:00 3.50 CASE P RUNPRD Continued in hole 8840' -Hanger hooked casing ~ 4998' -on depth -Picked up and rotated 1/4 turn and ran to 8845' -Picked up and rotated 1/4 turn and ran to 8840' -hanger did not hook Printed: 723/2008 2:28:44 PM ~ r g p Page 21 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/23/2008 00:30 - 04:00 3.50 CASE P RUNPRD -Picked up and roated 1/4 turn and ran to 8840' -hanger hooked -Hanger hooked on depth ~ 4998' -Verified S/O wt. reduced from 75k before hooking to 35k after hooking -Up Wt 140k /Down Wt. 75k 04:00 - 04:30 0.50 CASE P RUNPRD Dropped ball to shear HR running tool -Ball seated ~ 808 strokes -Pressured up to 4300 psi ~ 1247 strokes when sheared -Picked up to 4944' and circulated bottom up -Up Wt. 120k 04:30 - 05:00 0.50 CASE P RUNPRD Pumped dry job - 81 spm ~ 198 gpm , 585 psi -Monitored well -static -Mud Wt In 9.3 ppg / Out 9.3 ppg -Pulled out of hole from 4944' to 4300' 05:00 - 08:30 3.50 CASE P RUNPRD -Continued to pull out of the hole from 4300' -Layed down the BHA 08:30 - 09:00 0.50 CASE P RUNPRD Ciean and cleared floor of Baker Tools 09:00 - 10:00 1.00 TIEBAC P OTHCMP Rig up to run casing equipment for LEM # 1 run 10:00 - 13:00 3.00 TIEBAC P OTHCMP PJSM, with Baker Hands, NAD Casing hand, NAD Rig Crew, NAD Toolpusher and BP WSL. -Torque tum Vam Top to 4400 fUlbs and doped with Jet Lube Seal Guard -Rig up false floor and change out elevators -M/U LEM # 1 with EUE 23/8" work string -M/U 5 1/2" Hydril to 5500 fUlbs -Up Wt 40k /Down Wt. 40k 13:00 - 13:30 0.50 TIEBAC P OTHCMP Rig down casing equipment used to make up LEM # 1 13:30 - 16:30 3.00 TIEBAC P OTHCMP Run in hole from 216' to 4964' 16:30 - 17:30 1.00 TIEBAC P OTHCMP Slack off to 5060' -Up Wt. 123k /Down Wt. 90k -Pumped 52 spm ~ 127 gpm , 650 psi -Entered Seal Bore ~ 5132' -Pressure increase and down wt reduced to 83k ,Latch Up -Seals were located on depth ~ 5143' -Slack off to 50k, then pick up and unlatch ~ 160k; Relatch LEM. -Up Wt. 100k /Slack off Wt. 50k 17:30 - 18:00 0.50 TIEBAC P OTHCMP Drop 1 3/4" ball to seat -2 bpm ~ 442 psi -Increase in psi up to 3100 -Hold -Increase to 4100 psi -set packer and release running tool -Pressure Test 7 5/8" annulus to 1500 psi for 5 minutes- good -Pick up to 5060' and monitor well -static -Pumped dry job and blow down lines -LEM latched ~ 4945' 18:00 - 21:00 3.00 TIEBAC P OTHCMP Pull out of the hole from 5060' to 216' 21:00 - 23:00 2.00 TIEBAC P OTHCMP Laydown LEM running tool and 2 3/8" EUE work string 23:00 - 00:00 1.00 TIEBAC P OTHCMP Rig down LEM running tools and clean and clear the floor 6/24/2008 00:00 - 02:30 2.50 STWHIP P WEXIT Make up and run in hole with Whipstock Assembly BHA -Anchor,magnet, whipstock slide, window mill, float sub rnncea: iicacwo cco:w~ rm r ~ gp Page 22 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To Hours Task ~ Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 Phase Description of Operations 6/24/2008 00:00 - 02:30 2.50 STWHIP P WEXIT -Run in hole to 844' 02:30 - 03:00 0.50 STWHIP P WEXIT Shallow test the MWD tool- good test -107 spm ~ 262 gpm , 887 psi 03:00 - 04:00 1.00 STWHIP P WEXIT Run in hole from 844' to 2761' with Whipstock Assembly BHA 04:00 - 05:00 1.00 STWHIP P WEXIT Service rig -Grease top drive, drawworks, and crown 05:00 - 06:00 1.00 STWHIP P WEXIT Continue in hole from 2761' to 4895' 06:00 - 06:30 0.50 STWHIP P WEXIT Orient whipstock to -19 deg. -Up Wt. 120k /Down Wt. 85k -Slacked off 14k to set anchor - postive indication of setting -Slack off 35k to shear lug -positive indication of setting -Pick up 90k and rotate 14 rpm ,Torque 4k 06:30 - 07:30 1.00 STWHIP P WEXIT Displace to LSMOBM -114 spm ~ 279 gpm , 1630 psi -Mud Wt. In 9.2 ppg / Out 9.2 ppg 07:30 - 11:00 3.50 STWHIP P WEXIT Mill window for L4 -ROT 95k , WOB 1-3k , 60-95 rpm -Torque 4-5k -102 spm ~ 250 gpm , 1250 psi -TOW 4841' BOW 4853' 11:00 - 12:00 1.00 STWHIP P WEXIT Begin to kick off into formation from 4853'to 4875' -ROT 95k , WOB 1-3k, 100 rpm -Torque 4.6 - 7k -102 spm ®250 gpm , 1250 psi 12:00 - 14:00 2.00 STWHIP P WEXIT Circulate 2 bottoms up -103 spm ~ 250 gpm , 1238 psi -Pump 50 bbl Hi-Vis Sweep - No increase in cuttings -Monitor Well -Static -Mud Wt. In 9.2 ppg /Out 9.2 ppg 14:00 - 15:30 1.50 STWHIP P WEXIT Pull out of hole from 4841' to 744' -Up Wt. 120k /Down Wt. 90k 15:30 - 17:30 2.00 STWHIP P WEXIT Stand back HWDP and Drill Collars -Lay down Milling Assembly -Clean and Clear Floor -Both upper and lower mills were in gauge when pulled out of the hole. 17:30 - 18:30 1.00 BOPSU P WEXIT Pull wear ring and flush out BOP stack 18:30 - 19:00 0.50 BOPSU P WEXIT Make up 4" test joint, floor valve, and install test plug 19:00 - 00:00 5.00 BOPSU P WEXIT Test BOPE. -Test all BOP related equipment to 250 psi low / 3500 psi high. -Test lower 2-7/8" x 5" VBR, upper 3-1/2" x 6" VBR, and Annular with 4" test joint to 250 psi low / 3500 psi high. 6/25/2008 00:00 - 01:00 1.00 BOPSU P WEXIT Continued to BOP Test 1 -Test lower and upper rams with 4.5" test joint 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Jeff Jones. Test Witnessed by WSL Blair Neufeld and NTP Brian Tiedemann. 01:00 - 02:00 1.00 DRILL P PROD5 Clean and Clear floor and prepare to make up BHA # 34 02:00 - 03:30 1.50 DRILL P PROD5 PJSM, with Schlumberger, Rig Crew, and NAD Toolpusher before picking up radioactive sources Make up BHA # 34 and run in hole to 288' -Hycalog SDX513M-A2 Bit Pdnted: 7/23/2008 2:26:44 PM ~ r gp Page 23 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/25/2008 102:00 - 03:30 I 1.50 I DRILL I P 03:30 - 06:00 2.50 DRILL P 06:00 - 07:00 1.00 DRILL P 07:00 - 07:30 0.50 DRILL P 07:30 - 12:00 4.50 DRILL P 12:00 - 00:00 12.001 DRILL I P 16/26/2008 100:00 - 12:00 12.001 DRILL I P 12:00 - 23:00 I 11.001 DRILL I P 23:00 - 00:00 1.001 DRILL I P 16/27/2008 100:00 - 12:00 I 12.00 I DRILL I P 12:00 - 15:30 I 3.501 DRILL I P 15:30 - 17:30 I 2.00 I DRILL I P PROD5 -Stabalizers -MWD -Drill Collars -Circ Sub -Jars -HWDP PROD5 Run in hole to 1240' and function test MWD -good test -Continue in the hole from 1240' to 4110' PROD5 Service topdrive,crown, and drawworks. PROD5 Orient to highside at window. -Wash from 4860' to 4875', 267 GPM ~ 1810 psi. PROD5 Drill from 4875' to 5189'. -Up wt. 110k,down wt. 80k,rotating wt 90k. -60 RPM 3k torque off bottom,4-5k torque on bottom. -300 GPM, 2300 psi off bottom, 2440 psi on bottom. -Mud wt. in and out 9.2 ppg. PROD5 Drill from 5189' to 6527'. -Up wt. 115k,down wt. 76k,rotating wt 93k. -60 RPM 4k torque off bottom,5k torque on bottom. -300 GPM, 2390 psi off bottom, 2485 psi on bottom. -Mud wt. in and out 9.3 ppg. PROD5 Drill from 6527' to 7942'. -Up wt. 120k,down wt. 70k,rotating wt 95k. -60 RPM 4-5k torque off bottom,5-9k torque on bottom. -300 GPM, 2470 psi off bottom, 2520 psi on bottom. -Mud wt. in and out 9.4 ppg. -Survey every 30'. -Back ream 30' on connections. PRODS Drill from 7942' to 8763'. -Up wt. 123k,down wt. 68k,rotating wt 91 k. -60 RPM 5k torque off bottom,5.5k torque on bottom. -300 GPM, 2600 psi off bottom, 2667 psi on bottom. -Mud wt. in and out 9.3 ppg. -Survey every 30'. -Back ream 30' on connections. PROD5 Circulate annular volume. -300 GPM ~ 2587 psi. -Record slow pump rates. -Monitor well,static. -Mud wt. in and out 9.3 ppg. -38 bblsVersa Pro lost (cuttings very wet off shakers) PROD5 Backream /MAD-PASS logging with LWD 8763'-5729' -300 GPM ~ 2539 psi -60 RPM, 6k torque ~ 600 FPH PROD5 Backream /MAD-PASS logging with LWD 5729'-5150' -300 GPM ~ 2539 psi -60 RPM, 6k torque ~ 600 FPH -Pull dry from 5150' to inside window. -Pull 20k over ~ 4877'(stabilizer in window) -Swabbing inside casing ~ 4830' -16 bbls mud lost to hole while logging. PROD5 Break circulation ~ 4830',stage pumps up to 300 GPM ~ 2065 psi. rnrnea: nz;vzuuu Z:Ztl:94 YM gp Page 24 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/27/2008 15:30 - 17:30 2.00 DRILL P PROD5 -Circulate 4 x bottoms up to clean casing. -1st bottoms up 80% excess cuttings. -2nd bottoms up 40% excess cuttings. 17:30 - 18:00 0.50 DRILL P PROD5 Service topdrive,drawworks,crown & blocks. 18:00 - 19:00 1.00 DRILL P PROD5 Slip & cut 71' drilling line. 19:00 - 21:30 2.50 DRILL P PROD5 Run in hole from 4777'to 8671' -Wash down to 8763' 60 RPM,7k torque. -300 GPM ~ 2680 psi. 21:30 - 22:30 1.00 DRILL P PRODS Circulate bottoms up 300 GPM ~ 2680 psi. -Rotate 80 RPM ®6.5k torque. 22:30 - 00:00 1.50 DRILL P PROD5 Displace well to 9.2 ppg SFMOBM -298 GPM ®2750 psi. -80 RPM ~ 6.5k torque. -Record slow pump rates. -Monitor well,static. -Pump dry job. -Mud wt. in and out 9.2 ppg. 6/28/2008 00:00 - 04:30 4.50 DRILL P PRODS Pull out of the hole from 8763' to 4841' -Up Wt. 125k /Down Wt. 68k -Monitor well ~ window -static -Continued to pull from 4841'to 288' -Mud Wt. In 9.2 ppg /Out 9.2 ppg 04:30 - 06:00 1.50 DRILL P PROD5 Laydown BHA -Stand back Jars & Flex collars -PJSM with Schlumberger,NAD Rig Crew, NAD Tourpusher, and BP WSL about removal of Radioactive Sources. 06:00 - 07:00 1.00 WHIP P RUNPRD Make up whipstock retrieval assembly with HWDP and 9 drill collars. 07:00 - 08:00 1.00 WHIP P RUNPRD Run in hole to 1806' with "J" hook. 08:00 - 08:30 0.50 WHIP P RUNPRD Fill pipe,shallow test MWD, 269 GPM ~ 946 psi. 08:30 - 09:30 1.00 WHIP P RUNPRD Run in hole to 4841'. -Up wt 120k,down wt 85k 09:30 - 10:30 1.00 WHIP P RUNPRD Orient hook to 19 left and latch into whipstock. -Stage weight up to 80k overpull,pulledfvee. -Pull whipstock 30' up hole and circulate bottoms up. -271GPM ~ 1452 psi. -Monitor well,static. - Mud weight in and out 9.3 ppg. 10:30 - 13:00 2.50 WHIP P RUNPRD POH with whipstock from 4841'to 107' 13:00 - 16:00 3.00 WHIP P RUNPRD Lay down Whipstock retrieval assembly. 16:00 - 17:00 1.00 CASE P RUNPRD Rig up to run 4 1/2", 12.6#, L-80 slotted liner. 17:00 - 00:00 7.00 CASE P RUNPRD Run 4 1/2", 12.6#, L-80, IBT liner. -BOL 2000 NM,torque to 3000 fUlbs. -RIH to 4015' Up wt 82k down wt 65k. -72 jts Slotted liner -18 jts. Solid liner -4 swell packers,7419',6915',5279',4925'. -88 Volant Hyroform centralizers free floating,8 locked down on swell packer pup joints. -Rig down casing equipment. -Break circulation. 6/29/2008 00:00 - 00:30 0.50 CASE P RUNPRD RIH from 4015' to window ~ 4841'. -Run in past window & tagged No-Go ~ 4863' Printed: 7/23/2008 2:28:44 PM BP Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Start: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase 6/29/2008 00:00 - 00:30 0.50 CASE P RUNPRD 00:30 - 03:30 I 3.001 CASE I P I RUNPRD 6/30/2008 03:30 - 04:30 I 1.001 CASE I P I RUNPRD 04:30 - 06:30 I 2.001 CASE I P I RUNPRD 06:30 - 07:00 0.50 CASE P RUNPRD 07:00 - 08:00 1.00 TIEBAC P OTHCMP 08:00 - 10:00 2.00 TIEBAC P OTHCMP 10:00 - 10:30 0.50 TIEBAC P OTHCMP 10:30 - 14:00 3.50 TIEBAC P OTHCMP 14:00 - 16:30 2.50 TIEBAC P OTHCMP 16:30 - 17:00 0.50 TIEBAC P OTHCMP 17:00 - 19:00 2.00 TIEBAC P OTHCMP 19:00 - 20:30 1.50 TIEBAC P OTHCMP 20:30 - 23:00 2.50 STWHIP P WEXIT 23:00 - 00:00 1.00 STWHIP P WEXIT 00:00 - 01:00 1.00 STWHIP P WEXIT 01:00 - 01:30 0.50 STWHIP P WEXIT 01:30 - 02:30 1.00 STWHIP P WEXIT 02:30-03:001 0.501STWHIPIP I WWEXIT Page 25 of 30 Spud Date: 4/27/2008 End: 7/8/2008 Description of Operations -Picked up to window and rotated the drillstring 1/2 turn -Went through window ~ 4841' -Continued to run in hole ~ 60 fph Continued in hole 8763' -Missed hook, ran in to 8760' -Picked up and rotated 1/2 tum run in,hooked X4843' -Picked up and rotated 1/2 tum and ran to 8760 -hanger did not hook -Picked up and mated 1/2 tum and ran in to 8752' hooked -Hanger hooked on depth X4853 -Up Wt 140k /Down Wt. 72k ,Dropped ball to shear HR running tool -Ball seated ~ 732 strokes -Pressure up to 2800psi to release. -Bleed off pressure,pick up 60' -Pressured up to 3400 psi to shear ball out. -Circulate bottoms up -Up Wt. 120k Pumped dry job -Monitored well -static -Mud Wt In 9.3 ppg / Out 9.3 ppg -Pull out of hole Lay down liner running tool. Rig up to run LEM & inner string. Pick up & make up LEM assembly and inner string. Clear floor of casing equipment. Run in hole with LEM assembly to 4954' Wash down to 4959' -Set down,did not latch -Pick up and rotate 90 deg. -Set down,latched in. -Pick up to verify latch then set down to latch. -Drop ball & pump down to release running tool,set packer. -Ball on seat X588 stks, 3300 psi to set packer,3700 psi to release running tool. -Test Packer to 1500 psi.good test. -Pick up to 4571',circulate 176 GPM ~ 500 psi. -Monitor well,static, - Mud wt in and out 9.2 ppg. Service topdrive,crown, and drawworks. POH from 4571' to running tool. Service break and lay down running tool. Make up Whipstock BHA. Run in hole from 244' to 516'. Run in hole with whipstock from 518' to 1696'. Shallow pulse test MWD,281 GPM ~ 1705 psi. Run in hole with whipstock from 1696' to 4708'. -Up wt 124k down wt 90k Orient whipstock to 11 left of highside. -Tag up at 4783' and set anchor. -Shear off with 40k down . -TOW 4640' -BOW 4652' Printed: 723/2008 2:28:44 PM gp Page 26 of 30 I Operations `Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT ..Phase Description of Operations 6/30/2008 103:00 - 04:00 04:00 - 09:00 09:00 - 10:30 09:00 - 11:30 11:30 - 13:30 13:30 - 14:00 14:00 - 15:30 15:30 - 17:00 1.00 STWHIP P 5.00 STWHIP P 1.50 STWHIP P 2.50 STWHIP P 2.00 STWHIP P 0.50 STWHIP P 1.50 DRILL P 1.50 DRILL P 17:00 - 17:30 0.50 DRILL P 17:30 - 18:00 0.50 DRILL P 18:00 - 18:30 0.50 DRILL P 18:30 - 20:00 1.50 DRILL P 20:00 - 23:00 3.00 DRILL P WEXIT Displace system to LS MOBM. -284 GPM ®1640 psi. -Record slow pump rates. WEXIT Mill window from 4640' to 4674'. WEXIT -Work mills through window. WEXIT Circualte Hi-Vis sweep. -280 GPM ~ 1455 psi. -Monitor well,static. -Mix & pump dry job. -Mud weight in and out 9.2ppg. -Record slow pump rates. WEXIT POH from 4674' to 99'. WEXIT Lay down milling assembly,mills in gauge. PROD6 Clear floor of tools. PROD6 PJSM, make up BHA #37 with motor, MWD, flex collars and jar to 287'. PROD6 Run in hole from 287' to 1243'. PROD6 Shallow pulse test MWD,296 GPM ~ 1400 psi. PROD6 Service Topdrive,drawworks,and crown. PROD6 Run in hole from 1243' to 4588'. PROD6 Drill sliding from 4674' to 4776'. -Up wt 113k,down wt. 89k -286 GPM ~ 1900 psi.off bottom,2020 psi on bottom. -5k WOB 23:00 - 00:00 1.00 DRILL N SFAL PROD6 Pull into window to trouble shoot MWD 7/1/2008 00:00 - 00:30 0.50 DRILL N SFAL PROD6 Attempted to continue drilling,washed out pop off valve. -Pull back into window 00:30 - 01:30 1.00 DRILL N SFAL PROD6 Service rig change pop-off on #2 pump. 01:30 - 02:30 1.00 DR1LL N SFAL PROD6 MADD PASS log drilled section due to MWD surface problems 02:30 - 12:00 I 9.501 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 17/2/2008 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 17:30 5.501 DRILL P while drilling. PROD6 Drill from 4776' to 5378'. -300 GPM, 2159 psi off bottom, 2294 psi on bottom. -5-10k WOB ~ 40 RPM with 3-4k TO off, 3-4k TO on. -117k Up Wt, 79k Dn Wt, 103k Rot. -Mud wt. in and out 9.3 ppg. -Survey every 30'. -Back ream 30' on connections. PROD6 Continue drilling from 5378' to 6616'. -300 gpm with 2295 psi off, 2480 psi on. -5-10k WOB ~ 60 RPM with 3-4k TO off, 5-6k TO on. -120k Up Wt, 76k Dn Wt, 96k Rot. -Mud Wt in and out = 9.2 ppg. -Survey every 30'. -Backream 30' on connections. PROD6 Continue drilling Nb Lateral from 6616' to 7910'. -300 gpm ~ 2501 psi off, 2654 psi on -5-10k WOB with 60 RPM ®4.4k TO off, 5.8k TO on -139k Up Wt, 54k Dn Wt, 89k Rot -Survey every 30' -Backream 30' on connections. -MW in and out = 9.2 ppg PROD6 Continue drilling from 7910' to TD ~ 8630'. -300 gpm ~ 2530 psi off, 2570 psi on Printed: 7/23/2008 2:28:44 PM • • gP Page 27 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 17/2/2008 12:00 - 17:30 I 5.50 ~ DRILL I P I PROD6 17:30 - 18:00 0.50 DRILL P PROD6 18:00 - 00:00 6.00 DRILL P PROD6 17/3/2008 100:00 - 09:30 I 9.50 DRILL P PROD6 09:30 - 10:30 I 1.00 I DRILL I P I I PROD6 10:30 - 11:30 I 1.00 I DRILL I P I I PROD6 11:30 - 12:30 1.00 DRILL P PROD6 12:30 - 15:30 3.00 DRILL N DFAL PROD6 15:30 - 16:30 1.00 DRILL N DFAL PROD6 16:30 - 17:30 1.00 DRILL N DFAL PROD6 17:30 - 18:00 0.50 DRILL N DFAL PROD6 18:00 - 19:30 1.50 DRILL N DFAL PROD6 19:30 -21:00 1.50 DRILL P PROD6 21:00 - 22:00 1.00 DRILL P PROD6 22:00 - 00:00 2.00 DRILL P PROD6 7/4/2008 00:00 - 00:30 0.50 DRILL P PROD6 00:30 - 01:00 0.50 DRILL P PROD6 01:00 - 02:00 I 1.00 DRILL I P I PROD6 -5-10k WOB with 60 RPM ~ 4k TO off, 5.6k TO on -141 k Up Wt, 61 k Dn Wt, 94k Rot -Survey every 30' -Backream 30' on connections -MW in and out = 9.3 ppg. Circulate 1 open hole annular volume ~ 300 gpm, 2515 psi. MAD Pass from 8630' to 7058' ~ 600 fph. -Slow to 300 fph for Density Caliper Data in intervals as per Geologist -300 gpm ~ 2515 psi -60 RPM ~ 4k TO -95k Rot Wt Continue MAD Passing from 7058' to 5053' ~ 600 fph. -Ran into tight spot ~ 6790' to 6716', 5180' and 4994'. Worked through several times and broke free. -Slow to 300 fph for Density Caliper Data in intervals as per Geologist -300 gpm ~ 2300 psi -60 RPM ~ 4k TO -90k Rot Wt Pump out of hole from 5053' to 4745' due to sudden pressure loss down hole. Suspect washout in drillpipe. -200 gpm ~ 826 psi -60 rpm ~ 3.3k TO -120k Up Wt, 90k Dn Wt, 102k Rot POH with no pump or rotation from 4745' to 4397'. -115k Up Wt, 90k Dn Wt Service top drive and blocks. POH from 4397' to 194'. -Monitor well -static -Found circ sub washed out and open Lay down BHA #37. Clean and clear rig floor. Pick up Cleanout BHA #38 to 187'. RIH on 4" DP from 187' to 4625'. Attempt to circulate ~ 4625' and found drillstring packed off. Work string to unplug jets. Successfully able to establish cirulation. -CBU 3X ~ 404 gpm, 2245 psi. -95 rpm ®3.3k TO -118k Up Wt, 92k Dn Wt, 97k Rot Slip and cut 65' of drilling line. RIH from 4625' to 7334'. -120k Up Wt, SOk Dn Wt -No problems ~ 7-5/8" window (4640 -Took Weight ~ 4775', then broke free. Continue to RIH from 7334' to 8570'. Screw in Top Drive and wash down to 8630'. -No fill on bottom -CBU ~ 426 gpm, 3362 psi -60 rpm ~ 4.3k TO Displace wellbore to 9.3 ppg SFMOBM -400 gpm ®3340 psi rnnzea: ncaauo cco:vv rm • gp Page 28 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/4/2008 01:00 - 02:00 1.00 DRILL P PROD6 -60 rpm ~ 4.2k TO -Monitor Well -Static 02:00 - 07:00 5.00 DRILL P PROD6 Pump Dry Job and POH from 8630' to 187'. 07:00 - 07:30 0.50 DRILL P PROD6 Lay down Cleanout BHA #38 07:30 - 09:30 2.00 WHIP P RUNPRD Pickup Whipstock Retrieval BHA and Drill Collars to 388'. 09:30 - 10:00 0.50 WHIP P RUNPRD RIH from 388'to 1343'. 10:00 - 10:30 0.50 WHIP P RUNPRD Test MWD ~ 259 gpm, 847 psi -good. 10:30 - 12:00 1.50 WHIP P RUNPRD RIH from 1343'to 4593'. 12:00 - 12:30 0.50 WHIP P RUNPRD Orient Whipstock Retrieval Tool 11 degrees left of highside -257 gpm ~ 1309 psi -Wash down to 4645' and hook into whipstock. -Stage up to 80k overpull and pull whipstock free. 12:30 - 13:00 0.50 WHIP P RUNPRD CBU ~ 335 gpm, 2013 psi -Monitor well -static 13:00 - 15:30 2.50 WHIP P RUNPRD Pump dry job and POH from 4645'to 388' 15:30 - 16:00 0.50 WHIP P RUNPRD Stand back DC's and lay down Whipstock Retrieval BHA. 16:00 - 17:30 1.50 WHIP P RUNPRD Lay down whipstock and whipstock space out assembly. 17:30 - 18:30 1.00 WHIP P RUNPRD Clean and clear rig floor. 18:30 - 19:00 0.50 CASE P RUNPRD Rig up to run 4.5" Nb Slotted/Solid IBT Liner. 19:00 - 00:00 5.00 CASE P RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid Nb Lateral Liner as per running detail. -Use BOL 2000 Pipe Dope -Ave TO = 3000 ft-Ibs -75k Up Wt, 64k Dn Wt 7/5/2008 00:00 - 02:30 2.50 CASE P RUNPRD Continue running in hole with 4.5" 12.6# L-80 IBT Slotted/Solid Nb Lateral Liner to 4640'. 02:30 - 04:00 1.50 CASE P RUNPRD Attempt to exit window with lateral ~ 4640'. -Tagged bottom of OA Liner Top Tieback ~ 4800'. -Successfully able to exit window on 4th orientation. -108k Up Wt, 84k Dn Wt 04:00 - 06:30 2.50 CASE P RUNPRD Continue to RIH with 4.5" liner on DP to 8618'. -Orient Hook hanger and set on fourth attempt. -132k Up Wt, 69k Dn Wt 06:30 - 07:00 0.50 CASE P RUNPRD Drop 29/32" ball and pump on seat. -Release HR setting tool -shear seat ~ 4050 psi. 07:00 - 07:30 0.50 CASE P RUNPRD CBU 1X ~ 250 gpm, 880 psi. -Monitor Well -Static 07:30 - 11:00 3.50 CASE P RUNPRD Pump dry job and POH from 4560' to 35'. -Lay down hook hanger running tool assembly. 11:00 - 11:30 0.50 CASE P RUNPRD Clean and clear rig floor. 11:30 - 13:30 2.00 CASE P RUNPRD Pick up 3.5" Mule Shoe and XO. RIH on DP to 4636' 13:30 - 15:00 1.50 CASE P RUNPRD Stab into Liner Top Packer Tieback (on LEM #2) and bottom out ~ 4795'. -CBU ~ 405 gpm, 1747 psi. -Monitor Well -Static 15:00 - 17:00 2.00 CASE P RUNPRD Pump Dry Job and POH from 4795'. -Lay down 3.5" Mule Shoe 17:00 - 18:00 1.00 TIEBAC P OTHCMP Rig up to run 4.5" LEM #3 Assembly. 18:00 - 19:30 1.50 TIEBAC P OTHCMP Make up LEM #3 Assembly as per running detail. -Use Jet Lube Seal Guard on Vam Top connections -Ave TO =4440 ft-Ibs. 19:30 - 20:00 0.50 TIEBAC P OTHCMP Rig down casing equipment. Clean and clear floor. 20:00 - 22:30 2.50 TIEBAC P OTHCMP RIH with LEM #3 Assembly on DP to 4636'. Printed: 723/2008 2:28:44 PM • • BP Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Start: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase 7/5/2008 22:30 - 00:00 1.50 TIEBAC P OTHCMP 17/6/2008 100:00 - 00:30 ( 0.501 TIEBAC I P I I OTHCMP 00:30 - 03:30 ~ 3.00 ~ TIEBAC ~ P ~ ~ OTHCMP 03:30 - 07:00 3.50 TIEBAC P OTHCMP 07:00 - 08:00 1.00 TIEBAC P OTHCMP 08:00 - 09:30 1.50 TIEBAC P OTHCMP 09:30 - 10:00 0.50 TIEBAC P OTHCMP 10:00 - 12:00 2.00 TIEBAC P OTHCMP 12:00 - 12:30 0.50 TIEBAC P OTHCMP 12:30 - 15:00 2.50 TIEBAC P OTHCMP 15:00 - 16:00 1.00 TIEBAC OTHCMP 16:00 - 16:30 0.50 TIEBAC P OTHCMP 16:30 - 17:00 0.50 TIEBAC P OTHCMP 17:00 - 17:30 0.50 BUNCO RUNCMP 17:30 - 19:00 1.50 BUNCO RUNCMP 19:00 - 22:30 ~ 3.50 ~ RUNCOI~'P ~ ~ RUNCMP 22:30 - 00:00 1.501 RUNCON'P I RUNCMP 7/7/2008 100:00 - 09:30 9.501 RUNCOAIP I RUNCMP 09:30 - 12:00 ~ 2.50 ~ RUNCON~P ~ ~ RUNCMP 12:00 - 12:30 I 0.501 RUNCON~P I I RUNCMP 12:30 - 13:00 0.50 RUNCOI~'P RUNCMP 13:00 - 15:00 2.00 BUNCO RUNCMP Page 29 of 30 Spud Date: 4/27/2008 End: 7/8/2008 Description of Operations RIH through hook hanger and sting into Seal Bore Extension. -Set down 30k and latch LEM into Hook Hanger. -Pickup 10k overpull to confirm latched in -good. -Drop 1.75" ball and pump onto seat. -Pressure up to 2000 psi to set Liner Top Packer. -Continue pressure up to 3500 psi to neutralize pusher tool. -Continue pressure up to 4000 psi to release running tool. Pressure Test Liner Top Packer to 1500 psi for 10 minutes - good. -Pull running tool above LTP and tag to confirm - ok. Displace wellbore from SFMOBM to 9.3 ppg Brine -250 gpm ~ 780 psi -Clean out under shakers and flush hole fill line -Blow down top drive and monitor well -static Lay down Drill Pipe from 4765' to 1230'. RIH with 4" DP stood back in derrick from 1230' to 4080'. Lay down DP from 4080' to 3020' Service top drive and drawworks Lay down DP from 3020' to 1230' RIH with 4" DP stood back in derrick from 1230'to 3236' Lay down DP from 3236' to HWDP Lay down 24 joints of HWDP and (9) 4-3/4" Drill Collars. Lay down Baker LTP Running Tool. Clean and clear rig floor. Pull wear ring and make dummy run with tubing hanger -good Rig up to run 4.5" 12.6# 13Cr-80 Vam Top Tubing. -Change out bails and RU compensator -Bring I-Wire spool to floor and rig up PJSM. Run 4.5" 12.6# 13Cr-80 Vam Top Completion as per running detail. -Make up 4.5" Phoenix Gauge Carriers and splice in I-Wire. -Perform test on I-Wire splices -good Continue to run 4.5" Completion as per running detail. -Dope connections with Jet Lube Seal Gaurd -TO Turn to 4440 tt-Ibs Continue to run 4.5" 12.6# 13Cr-80 Vam Top Completion w/I-wire as per running detail. -Tag base of tieback ~ 4617' -Use Jet Lube Seal Gaurd Dope -MU TO = 4440 tt-Ibs -Check I-wire integrity every 1000' -good. -PUW = 92k Ibs, SOW = 76k lbs. Space out completion and make up landing jt and hanger. -Terminate I-wire and test control line communication throught hanger to 5000 psi for 10 minutes -good. Land tubing hanger with bottom of tailpipe ~ 4612'. -RILDS and torque to 450 ft-Ibs -Ran 66 full I-wire clamps and 15 half I-wire clamps on tubing -Rig down casing equipment and clear floor. Rig up to reverse circulate and pump corrosion inhibitor. Reverse circulate 253 bbls clean 9.3 ppg brine, followed by 57 bbls corrosion inhibited brine, followed by 5 bbls clean brine ~ 3 bpm, 180 psi rnncea: ncwcwo cco:~w rm gp Page 30 of 30 Operations Summary .Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To I Hours Task Code I NPT Rhase Description of Operations 17/7/2008 115:00 - 15:30 I 0.501 R 15:30 - 19:00 I 3.50 19:00 - 19:30 I 0.501 RU 19:30 - 23:00 I 3.50 23:00 - 00:00 I 1.00 BOPSUf~ P 17/8/2008 100:00 - 03:00 3.00 BOPSUp P 03:00 - 07:00 I 4.001 WHSUR I P 07:00 - 08:00 1.00 WHSUR P 08:00 - 12:00 4.00 WHSUR P 12:00 - 13:00 I 1.001 WHSUR I P 13:00-14:001 t.00IWHSURP RUNCMP Drop ball and rod. -Back out and lay down landing joint -Close blind rams RUNCMP Pressure up and set packer with 4000 psi in tubing. -Attempt to hold for 30 minutes -surface equipment leaking. -Change out leaking bleeder valves -Blind rams leaking - PU and make up landing joint -Test tubing to 4000 psi for 30 minutes -good. -Bleed off to 2500 psi, then test annulus to 3500 psi for 30 mins - good. -Bleed off annulus, then tubing. -Pressure up backside and shear DCK Valve ~ 2180 psi. -Confirm circulation both ways through shear valve -good. RUNCMP Lay down landing joint and install TWC. -Test to 1000 psi from below -good. RUNCMP Clean out Oil Based Mud System. -Remove mats and rotary table cover -Clean OBM from around rotary table and clean all drains. RUNCMP Drain stack, pull riser, and remove turnbuckles. -Remove and drain mouse hole. RUNCMP Nipple down BOP stack and set back on stump. -Remove blind rams from stack to send back for inspection/repairs. -Blow down Choke and Kill Line -Change out long bails and prep floor for rig move RUNCMP Nipple up tree adapter flange. -Terminate I-wires, orient as per SLB, and check wire integrity. Test I-wire and adapter flange to 5,000 psi - OK. -Nipple up double master valves with stems toward driller side and test to 5000 psi for 5 min -good. RUNCMP RU DSM lubricator and pull TWC. -Rig up to freeze protect RUNCMP PJSM w/ Little Red. Rig up and pump 100 bbls of diesel down IA ~ 3 bpm, 1300 psi. -Allow diesel to U-tube. RUNCMP Rig down U-tube equipment. -Install BPV with DSM and test to 1000 psi from below. -Install VR plugs in annulus valves. -Rig down DSM. RUNCMP Remove double annulus valves, secure tree, and secure cellar. Release rig from operations on L-205 ~ 14:00 hrs on 7/8/08 Printed: 7/23/2008 2:28:44 PM . ___.. _ _ Schlumberger -~ ~-cu~~4 ~u rce pv rt Report Date: 27-Jun-08 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 168.000° Field: Prudhoe Bay Unit - WOA Vertical Secuon Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: L-PAD / L-205 ND Reference Dawm: Rotary Table Well: L-205 drilling ND Reference Elevation: 76.10 ft relative to MSL Borehole: L-205L4 Sea Bed I Ground Level Elevation: 47.60 ft relative to MSL UWIIAPI#: 500292338862 Magnetic Declination: 22.871° Survey Name I Date: L-204L4 /June 27, 2008 Total Field Strength: 57655.726 nT Tort I AHD I DDI I ERD ratio: 282.123° / 6027.45 ft / 6.541 / 1.405 Magnetic Dip: 80.877° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: 27-Jun-08 Location LaULong: N 70.35009145, W 149.32507882 Magnetic Declination Model: BGGM 2008 LocaOon Grid NIE YIX: N 5978082.320 ftUS, E 583130.470 ftUS North Reference: True North Grid Convergence Angle: X0.63562040° Total Corr Mag North -> True North: +22.871 ° Grid Scale Factor: 0.99990785 Local Coordinates Referenced 70: Well Head J Comments Measured Inclination Azimuth Sub•Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS Klt U.UU U.UU U .UU -/O. IU U.UU U .UU U. UU U .VU U. VU U. VU U.UU Oy/OUOL. JL JOJ IJU.9/ IV /U. JaUU714V VY 19~.JLOV/OOL GYD GC SS 100.00 0.57 217 .96 23. 90 100. 00 0 .32 0. 50 0 .50 -0. 39 -0. 31 0.57 5978081. 92 583130. 17 N 70. 35009038 W 149.32508131 181.00 0.86 102 .64 104. 89 180. 99 0 .83 1. 23 0 .84 -0. 84 0. 04 1.50 5978081. 48 583130. 52 N 70. 35008914 W 149.32507850 275.00 1.76 66 .92 198. 87 274. 97 0 .85 3. 31 2 .10 -0. 43 2. 06 1.25 5978081. 91 583132. 53 N 70. 35009027 W 149.32506213 366.00 0.89 343 .53 289. 85 365. 95 -0 .12 5. 10 3 .24 0. 79 3. 14 2.06 5978083. 15 583133. 60 N 70. 35009362 W 149.32505332 459.00 1.97 257 .97 382. 83 458. 93 -0 .84 7. 07 1 .79 1. 15 1. 37 2.26 5978083. 49 583131. 83 N 70. 35009460 W 149.32506768 551.00 3.36 217 .40 474. 73 550. 83 0 .91 11. 19 2 .24 -1. 32 -1. 81 2.46 5978080. 98 583128. 67 N 70. 35008785 W 149.32509353 644.00 5.70 201 .25 567. 44 643. 54 6 .55 18. 49 9 .33 -7. 79 -5. 14 2.84 5978074. 48 583125. 42 N 70. 35007017 W 149.32512056 736.00 7.65 210 .60 658. 82 734. 92 14 .88 29. 16 19 .96 -17. 32 -9. 92 2.42 5978064. 89 583120. 75 N 70. 35004413 W 149.32515931 835.00 8.60 223 .39 756. 83 832. 93 23 .93 43. 09 33 .79 -28. 37 -18. 36 2.06 5978053. 75 583112. 43 N 70. 35001394 W 149.32522783 935.00 9.75 241 .75 855. 57 931 .67 30 .55 58. 90 48 .87 -37. 81 -30. 95 3.13 5978044. 17 583099. 94 N 70. 34998814 W 149.32533 1035.00 13.48 249 .51 953. 51 1029 .61 34 .64 79. 00 67 .39 -45. 91 -49. 34 4.04 5978035. 87 583081. 65 N 70. 34996604 W 149.3254 1115.00 16.16 253 .08 1030. 84 1106 .94 36 .98 99. 46 86 .43 -52. 41 -68. 73 3.54 5978029. 16 583062. 33 N 70. 34994827 W 149.32563 MWD+IFR+MS 1136.89 16.70 254 .64 1051. 84 1127 .94 37 .42 105. 65 92 .23 -54. 13 -74. 67 3.19 5978027. 37 583056. 41 N 70. 34994357 W 149.32568501 1258.24 22.93 265 .48 1165. 99 1242 .09 35 .36 146. 66 130 .09 -60. 62 -115. 11 5.94 5978020. 43 583016. 05 N 70. 34992584 W 149.32601323 1326.92 24.06 268 .62 1228. 97 1305 .07 31 .04 174. 03 155 .35 -62. 01 -142. 44 2.45 5978018. 74 582988. 74 N 70. 34992203 W 149.32623514 1421.68 27.17 270 .67 1314. 41 1390 .51 22 .73 214. 99 193 .67 -62. 22 -183. 40 3.41 5978018. 07 582947. 79 N 70. 34992145 W 149.32656760 1516.50 30.08 271 .97 1397. 63 1473 .73 12 .25 260. 41 236 .83 -61. 15 -228. 80 3.14 5978018. 64 582902. 38 N 70. 34992437 W 149.32693620 1611.33 32.06 273 .04 1478. 86 1554 .96 -0 .02 309. 35 283 .89 -59. 00 -277. 69 2.17 5978020. 25 582853. 48 N 70. 34993025 W 149.32733307 1707.20 31.09 272 .76 1560. 53 1636 .63 -12 .93 359. 55 332 .65 -56. 46 -327 .83 1.02 5978022 .23 582803. 32 N 70. 34993718 W 149.32774004 1801.84 32.49 272 .47 1640. 97 1717 .07 -25 .51 409. 40 381 .50 -54. 19 -377. 63 1.49 5978023. 95 582753. 50 N 70. 34994338 W 149.32814434 1896.82 32.42 273 .61 1721. 12 1797 .22 -38 .74 460. 37 431 .61 -51. 49 -428. 53 0.65 5978026. 09 582702. 58 N 70. 34995076 W 149.32855751 1992.43 33.98 273 .42 1801. 12 1877 .22 -52 .74 512. 72 483 .20 -48. 28 -480. 78 1.64 5978028. 72 582650. 30 N 70. 34995951 W 149.32898168 2087.04 33.75 273 .91 1879. 68 1955 .78 -66 .97 565. 44 535 .28 -44. 91 -533. 39 0.38 5978031 .50 582597. 66 N 70. 34996871 W 149.32940878 2181.62 33.61 271 .96 1958. 39 2034 .49 -80 .49 617. 89 587 .29 -42. 22 -585. 77 1.15 5978033 .61 582545. 26 N 70. 34997604 W 149.32983395 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205 drilling\L-205L4\L-204L4 Generated 8/4/2008 11:08 AM Page 1 of 5 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de k k ft ft ft k ft de 1100 k ftUS kUS 2274. 74 33 .39 272.09 2036. 04 2112 .14 -92. 94 669 .28 638. 41 -40. 41 -637 .13 0.25 5978034 .85 582493 .89 N 70.34998099 W 149. 33025091 2367. 93 33 .39 272. 47 2113. 85 2189 .95 -105. 59 720 .57 689. 44 -38. 37 -688 .37 0.22 5978036 .32 582442 .63 N 70 .34998655 W 149. 33066691 2462. 46 33 .02 270. 42 2192. 94 2269 .04 -117. 63 772 .33 741. 05 -37. 06 -740 .12 1.25 5978037 .06 582390 .88 N 70 .34999011 W 149. 33108697 2557. 63 33 .63 270. 02 2272. 46 2348 .56 -128. 70 824 .62 793. 26 -36. 86 -792 .40 0.68 5978036 .68 582338 .60 N 70 .34999064 W 149. 33151140 2651. 46 33 .98 270. 29 2350. 43 2426 .53 -139. 69 876 .82 845. 40 -36. 71 -844 .61 0.41 5978036 .24 582286 .40 N 70 .34999102 W 149. 33193518 2746. 02 33 .40 270. 56 2429. 11 2505 .21 -150. 98 929 .27 897. 79 -36. 33 -897 .06 0.63 5978036 .05 582233 .95 N 70 .34999206 W 149. 33236096 2842. 54 33. 47 270. 62 2509. 66 2585 .76 -162. 57 982 .46 950. 91 -35. 78 -950 .24 0.08 5978036 .01 582180 .78 N 70 .34999354 W 149. 33279266 2937. 92 33. 60 270. 76 2589. 16 2665 .26 -174. 14 1035 .15 1003. 54 -35. 14 -1002 .92 0.16 5978036 .06 582128 .09 N 70 .34999525 W 149. 33322037 Tie-In Survey 2967. 43 33. 62 270. 56 2613. 74 2689 .84 -177. 72 1051 .48 1019. 86 -34. 96 -1019 .26 0.38 5978036 .06 582111 .76 N 70 .34999576 W 149. 33335297 MWD+IFR+MS 3107. 78 31 .53 273. 30 2732. 01 2808 .11 -195. 86 1127 .03 1095. 24 -32. 46 -1094 .76 1.82 5978037 .72 582036 .24 N 70 .35000254 W 149. 33396588 3203. 61 31 .04 273. 04 2813. 90 2890 .00 -208. 88 1176 .80 1144. 83 -29. 71 -1144 .45 0.53 5978039 .92 581986 .53 N 70 .35001004 W 149. 3343 3297. 38 30 .81 272. 91 2894. 34 2970 .44 -221. 34 1224 .99 1192. 88 -27. 21 -1192 .57 0.26 5978041 .89 581938 .38 N 70 .35001685 W 149. 3347 3392. 05 30 .68 272. 74 2975. 71 3051 .81 -233. 72 1273 .38 1241. 16 -24. 82 -1240 .91 0.17 5978043 .74 581890. 03 N 70 .35002335 W 149. 33515232 3487. 43 31 .05 272. 49 3057. 58 3133 .68 -246. 06 1322 .32 1289. 99 -22. 59 -1289 .79 0.41 5978045 .42 581841. 13 N 70 .35002942 W 149. 33554912 3582. 92 30 .87 268. 82 3139. 47 3215 .57 -256. 83 1371 .43 1339. 07 -22. 03 -1338 .89 1.99 5978045 .45 581792. 03 N 70 .35003095 W 149. 33594771 3678. 31 29 .99 263. 26 3221. 74 3297 .84 -263. 61 1419 .71 1387. 28 -25. 33 -1387 .04 3.09 5978041 .61 581743. 92 N 70 .35002190 W 149. 33633860 3772. 61 29 .22 254. 87 3303. 76 3379 .86 -264. 51 1466 .23 1433. 10 -34. 11 -1432 .69 4.47 5978032 .33 581698 .38 N 70 .34999790 W 149. 33670912 3866. 93 28 .77 247. 68 3386. 29 3462 .39 -259. 19 1511 .91 1476. 73 -48. 74 -1475 .92 3.72 5978017 .22 581655 .32 N 70 .34995789 W 149. 33706007 3962. 10 29 .80 240. 93 3469. 31 3545 .41 -248. 14 1558 .42 1519. 36 -68. 93 -1517 .79 3.63 5977996 .56 581613. 68 N 70 .34990270 W 149. 33739992 4055. 92 30 .62 236. 90 3550. 40 3626 .50 -232. 69 1605 .61 1560. 98 -93. 31 -1558 .19 2.33 5977971 .74 581573 .56 N 70 .34983608 W 149. 33772781 4150. 19 33 .73 229. 21 3630. 22 3706 .32 -211. 43 1655 .75 1602. 91 -123. 54 -1598 .14 5.45 5977941 .07 581533 .95 N 70 .34975347 W 149. 33805210 4243. 84 36 .39 222. 26 3706. 90 3783 .00 -182. 66 1709 .50 1644. 45 -161. 11 -1636 .53 5.12 5977903 .08 581495 .98 N 70 .34965082 W 149. 33836367 4339. 08 38 .26 217. 52 3782. 65 3858 .75 -147. 01 1767 .22 1686. 06 -205. 42 -1673 .50 3.60 5977858 .37 581459 .51 N 70 .34952974 W 149. 33866370 4434. 10 40 .45 214. 68 3856. 12 3932 .22 -106. 75 1827 .47 1727. 76 -254. 11 -1708 .97 2.98 5977809 .29 581424 .59 N 70 .34939670 W 149. 33895148 4527. 38 43 .34 211. 09 3925. 56 4001 .66 -62. 60 1889 .74 1769. 46 -306. 43 -1742 .73 4.02 5977756 .61 581391 .41 N 70 .34925376 W 149. 33922543 4621. 75 46 .89 207. 11 3992. 16 4068 .26 -12. 20 1956 .58 1812. 27 -364. 85 -1775 .16 4.80 5977697 .83 581359 .63 N 70 .34909413 W 149. 33948862 4716. 23 50 .92 201. 83 4054. 27 4130 .37 45. 07 2027 .74 1854. 98 -429. 65 -1804 .54 5.99 5977632 .73 581330 .98 N 70 .34891710 W 149. 33972695 Tie-In Survey 4812. 65 54 .90 197. 34 4112. 43 4188 .53 110. 59 2104 .63 1897. 85 -502. 09 -1830 .23 5.55 5977560 .01 581306 .09 N 70 .34871918 W 149. 33993535 TOW 4841. 00 56 .00 195. 89 4128. 51 4204 .61 131. 09 2127 .97 1910. 31 -524. 46 -1836 .90 5.73 5977537 .56 581299 .67 N 70 .34865805 W 149. 339 BOW 4853. 00 57 .80 195. 10 4135. 06 4211 .16 140. 01 2138 .03 1915. 57 -534. 15 -1839 .59 15.98 5977527 .85 581297 .09 N 70 .34863158 W 149. 9 3400 Inc+Trend 4875. 08 58 .41 195. 10 4146 .72 4222 .82 156. 69 2156 .77 1925. 37 -552 .25 -1844 .47 2.76 5977509 .70 581292 .41 N 70 .34858213 W 149. 34005086 4909. 98 62 .20 194. 25 4164 .01 4240 .11 183. 78 2187 .08 1941. 31 -581. 57 -1852 .15 11.06 5977480 .29 581285 .06 N 70 .34850202 W 149. 34011310 4941. 80 66 .40 193. 47 4177 .81 4253 .91 209. 58 2215 .75 1956. 35 -609 .40 -1859 .01 13.38 5977452 .39 581278 .51 N 70 .34842598 W 149. 34016876 4972. 92 71 .53 192. 72 4188 .97 4265 .07 235. 87 2244 .79 1971. 56 -637 .69 -1865 .59 16.64 5977424 .04 581272 .25 N 70 .34834871 W 149. 34022207 5004. 99 74 .91 191. 94 4198 .23 4274 .33 263. 85 2275 .49 1987. 64 -667 .68 -1872 .14 10.79 5977393 .98 581266 .03 N 70 .34826677 W 149. 34027521 5035 .55 80 .07 191. 19 4204 .85 4280 .95 291. 18 2305 .31 2003. 24 -696 .90 -1878 .12 17.05 5977364 .70 581260 .38 N 70 .34818695 W 149. 34032367 5067 .27 83 .51 190. 43 4209 .38 4285 .48 320 .12 2336 .70 2019. 67 -727 .73 -1884 .00 11.10 5977333 .81 581254 .83 N 70 .34810271 W 149. 34037139 5099 .61 86 .81 189. 60 4212 .11 4288 .21 349. 99 2368 .92 2036. 51 -759 .46 -1889 .61 10.52 5977302 .02 581249 .58 N 70 .34801602 W 149. 34041680 MWD+IFR+MS 5130 .40 90 .16 189. 31 4212 .92 4289 .02 378. 63 2399 .70 2052. 69 -789 .82 -1894 .66 10.92 5977271 .61 581244 .86 N 70 .34793309 W 149. 34045777 5162 .26 92 .80 187. 84 4212 .10 4288 .20 408. 45 2431 .54 2069. 37 -821 .30 -1899 .41 9.48 5977240 .07 581240 .47 N 70 .34784706 W 149. 34049625 5194 .48 95 .72 186. 85 4209 .70 4285 .80 438 .76 2463 .67 2085. 97 -853 .17 -1903 .52 9.57 5977208 .17 581236 .71 N 70 .34776001 W 149. 34052953 5225 .94 99 .15 184. 66 4205 .63 4281 .73 468 .46 2494 .86 2101. 69 -884 .20 -1906 .65 12.90 5977177 .11 581233 .93 N 70 .34767523 W 149. 34055487 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205 drilling\L-205L4\L-204L4 Generated 8/4/2008 11:08 AM Page 2 of 5 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft k de 100 ft ftUS ftUS ) OLO/.y0 5289.20 5319.49 5351.06 5384.71 5415.53 5447.80 5479.76 5511.15 5543.24 5575.43 5606.40 5638.72 5670.13 5701.48 5733.01 5765.41 5795.93 5827.66 5859.89 5891.39 5923.38 5955.34 5987.13 6019.37 6051.34 6082.65 6114.10 6145.84 6177.67 6209.39 6241.41 6273.23 6304.11 6336.14 6367.35 6399.38 6432.53 6463.25 6495.13 6526.84 6558.69 6590.32 IUV.yZ lr3J.4L 4ZUU.U~ 4L/O.7D 4`J8./~ 101.10 181.65 4194.09 4270.19 528.45 100.75 178.91 4188.34 4264.44 557.50 99.25 95.93 92.82 93.55 92.73 90.34 90.78 91.19 91.77 91.60 92.32 91.36 89.79 90.09 90.43 90.71 91.46 91.81 91.87 92.25 175.43 4182.86 4258 .96 588. 19 174.39 4178.42 4254 .52 621. 30 175.03 4176.07 4252 .17 651. 82 174.48 4174.27 4250 .37 683. 81 173.90 4172.52 4248 .62 715. 54 LDLtl.J6 2557.06 2586.80 2617.88 2651.24 2681.96 2714.18 2746.09 173 .04 4171.68 4247.78 746. 77 2777.47 171 .65 4171. 37 4247.47 778. 77 2809 .56 170 .64 4170. 81 4246.91 810. 90 2841 .74 172 .74 4170. 01 4246.11 841. 80 2872 .70 171 .28 4169. 06 4245.16 874. 02 2905 .01 170.36 4167.99 169.46 4166.98 168.50 4166.67 168.33 4166.70 168.34 4166.56 167.33 4166.25 168.41 4165.64 168.13 4164.74 167.22 4163.71 167.25 4162.56 4244.09 4243.08 4242.77 4242.80 4242.66 4242.35 4241.74 4240.84 4239.81 4238.66 905.37 936.69 968.21 1000.61 1031.13 1062.86 1095.08 1126.57 1158.54 1190.48 92.32 167. 60 4161.29 4237 .39 1222. 24 92.39 167. 04 4159. 97 4236 .07 1254. 45 92.08 167. 29 4158. 72 4234 .82 1286. 39 92.22 167. 48 4157. 55 4233 .65 1317. 68 92.70 167. 54 4156. 20 4232 .30 1349. 10 93.08 167. 88 4154. 60 4230 .70 1380. 80 89.93 167. 83 4153. 76 4229 .86 1412. 61 88.69 168. 61 4154. 14 4230 .24 1444. 33 89.20 168. 65 4154. 73 4230 .83 1476. 34 89.10 169. 00 4155. 21 4231 .31 1508. 16 89.03 169. 04 4155 .71 4231 .81 1539. 03 88.99 168. 08 4156 .26 4232 .36 1571. 05 88.17 168. 87 4157 .04 4233 .14 1602. 25 86.35 168. 89 4158 .57 4234 .67 1634. 24 86.94 169. 32 4160 .51 4236 .61 1667. 32 86.29 168. 36 4162 .32 4238 .42 1697. 99 87.07 167. 18 4164 .17 4240 .27 1729. 81 87.86 165. 11 4165 .57 4241 .67 1761. 47 87.72 165. 60 4166 .80 4242 .90 1793. 26 87.83 165. 55 4168 .03 4244 .13 1824. 84 2936.40 2967.73 2999.26 3031.66 3062.18 3093.91 3126.13 3157.62 3189.59 3221.53 3253.30 3285.51 3317.46 3348.74 3380.17 3411.86 3443.68 3475.40 3507.41 3539.23 3570.10 3602.13 3633.33 3665.32 3698.41 3729.08 3760.91 3792.59 3824.41 3856.02 CI-I /.7L -J7D.04 -IyV6.6/ 2131.76 -946.28 -1910.23 2145.26 -976.02 -1910.37 2158.20 -1007.07 -1908.83 2171.30 -1040.29 -1905.87 2183.66 -1070.88 -1903.04 2197.02 -1102.97 -1900.10 2210.36 -1134.71 -1896.87 2223.48 -1165.89 -1893.30 2236.71 -1197.69 -1889.02 2249.75 -1229.49 -1884.07 2262.91 -1260.12 -1879.59 2277.19 -1292.11 -1875.10 2290.82 -1323.10 -1870.10 2304.33 -1353.95 -1864.61 2317.81 -1384.90 -1858.58 2331.75 -1416.64 -1852.07 2345.16 -1446.53 -1845.90 2359.20 -1477.54 -1839.22 2373.83 -1509.05 -1832.45 2388.65 -1539.88 -1826.04 2403.74 -1571.11 -1819.22 2418.92 -1602.26 -1812.16 2434.43 -1633.26 -1805.25 2450.43 -1664.69 -1798.18 2466.54 -1695.84 -1791.08 2482.72 -1726.37 -1784.25 2499.31 -1757.05 -1777.45 2516.43 -1788.02 -1770.70 2533.96 -1819.12 -1764.01 2551.88 -1850.17 -1757.53 2570.42 -1881.56 -1751.22 2589.19 -1912.77 -1745.06 2607.74 -1943.08 -1739.18 2627.02 -1974.47 -1732.82 2646.00 -2005.04 -1726.59 2665.88 -2036.43 -1720.42 2686.79 -2068.93 -1714.17 2706.27 -2099.02 -1708.23 2726.26 -2130.12 -1701.49 2745.67 -2160.87 -1693.90 2765.05 -2191.67 -1685.86 2784.63 -2222.28 -1677.98 O./L .7`J!/ 14.7 .0.7 .701LJL.Va IV /V .J4/.707J4 VY 14.7.J4VV/LOJ 5.59 5977114 .99 581231.04 N 70 .34750562 W 149.34058378 8.96 5977085 .26 581231.22 N 70 .34742438 W 149.34058490 11.85 5977054 .24 581233.10 N 70 .34733957 W 149.34057236 10.33 5977021 .06 581236.43 N 70 .34724882 W 149.34054827 10.30 5976990 .50 581239.60 N 70 .34716524 W 149.34052521 2.83 5976958 .45 581242.90 N 70 .34707759 W 149.34050124 3.14 5976926 .74 581246.49 N 70 .34699086 W 149.34047495 8.09 5976895 .61 581250.40 N 70 .34690570 W 149.34044593 4.54 5976863 .86 581255.03 N 70 .34681882 W 149.34041117 3.39 5976832 .12 581260.33 N 70 .34673195 W 149.34037 9 7.03 5976801 .55 581265.15 N 70 .34664826 W 149.3403 4.55 5976769 .61 581269.99 N 70 .34656087 W 149.3402 3.72 5976738 .68 581275.34 N 70 .34647621 W 149.34025729 4.20 5976707 .90 581281.17 N 70 .34639194 W 149.34021268 5.84 5976677 .02 581287.54 N 70 .34630741 W 149.34016370 1.06 5976645 .36 581294.40 N 70 .34622070 W 149.34011083 1.11 5976615 .54 581300.90 N 70 .34613905 W 149.34006068 3.30 5976584 .61 581307.93 N 70 .34605432 W 149.34000636 4.08 5976553 .18 581315.05 N 70 .34596826 W 149.33995134 1.42 5976522 .43 581321.79 N 70 .34588404 W 149.33989932 2.85 5976491 .27 581328.96 N 70 .34579871 W 149.33984387 1.19 5976460 .21 581336.36 N 70 .34571362 W 149.33978653 1.12 5976429 .29 581343.62 N 70 .34562892 W 149.33973034 1.75 5976397 .94 581351.04 N 70 .34554307 W 149.33967289 1.25 5976366 .88 581358.48 N 70 .34545799 W 149.33961524 0.75 5976336 .43 581365.65 N 70 .34537458 W 149.33955972 1.54 5976305 .83 581372.79 N 70 .34529077 W 149.33950451 1.61 5976274 .94 581379.88 N 70 .34520616 W 149.3394 9.90 5976243 .91 581386.91 N 70 .34512120 W 149.3393 4.62 5976212 .94 581393.73 N 70 .34503638 W 149.33934269 1.60 5976181 .63 581400.39 N 70 .34495064 W 149.33929141 1.14 5976150 .49 581406.90 N 70 .34486537 W 149.33924131 0.26 5976120 .25 581413.12 N 70 .34478257 W 149.33919352 3.00 5976088 .93 581419.82 N 70 .34469682 W 149.33914191 3.65 5976058 .44 581426.39 N 70 .34461331 W 149.33909126 5.68 5976027 .12 581432.91 N 70 .34452755 W 149.33904113 2.20 5975994 .70 581439.52 N 70 .34443878 W 149.33899031 3.77 5975964 .68 581445.79 N 70 .34435659 W 149.33894208 4.43 5975933 .66 581452.87 N 70 .34427162 W 149.33888731 6.98 5975902 .99 581460.80 N 70 .34418761 W 149.33882569 1.60 5975872 .29 581469.19 N 70 .34410349 W 149.33876034 0.38 5975841 .78 581477.40 N 70 .34401987 W 149.33869638 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205 drilling\L-205L4\L-204L4 Generated 8/4/2008 11:08 AM Page 3 of 5 Comments Measured Inclination Azimuth Sub•Sea NO ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft) ft ft k ft) ft ft de 100 ft ftUS ftUS 6622 .35 87. 69 165 .68 4169 .28 4245. 38 1856 .82 3888. 02 6653 .42 86. 23 165 .28 4170 .93 4247. 03 1887 .82 3919. 05 6685 .12 86. 42 164 .65 4172 .96 4249. 06 1919 .41 3950. 68 6716 .83 86. 45 166 .01 4174 .93 4251. 03 1951 .02 3982. 33 6747 .58 86. 52 165 .18 4176 .81 4252. 91 1981 .68 4013. 02 6778 .88 86. 56 165 .08 4178 .70 4254. 80 2012 .89 4044. 27 6810 .91 86. 66 164. 93 4180 .60 4256. 70 2044 .82 4076. 24 6842 .35 86. 81 164. 40 4182 .39 4258. 49 2076 .15 4107. 63 6873 .79 90. 26 165. 03 4183 .19 4259. 29 2107 .53 4139. 06 6905 .88 90. 88 165. 64 4182 .87 4258. 97 2139 .58 4171. 14 6937 .53 91. 05 165. 52 4182 .34 4258. 44 2171 .20 4202. 79 6968 .57 91. 33 165. 18 4181 .70 4257. 80 2202 .20 4233. 82 6999 .74 91. 56 165. 97 4180 .91 4257. 01 2233 .33 4264. 98 7030 .33 91. 84 165. 04 4180 .00 4256. 10 2263 .88 4295. 56 7061 .28 92. 25 165. 59 4178 .90 4255. 00 2294 .77 4326. 49 7093 .91 91. 60 163. 91 4177 .80 4253. 90 2327 .33 4359. 10 7125 .01 91. 12 164. 17 4177 .06 4253. 16 2358 .35 4390. 19 7157 .02 91. 50 165. 54 4176 .33 4252. 43 2390 .30 4422. 19 7188 .15 91. 50 165. 00 4175 .52 4251. 62 2421 .38 4453. 31 7218 .93 91. 53 166. 44 4174 .70 4250. 80 2452 .13 4484. 08 7250 .07 90. 54 167. 22 4174 .14 4250. 24 2483 .26 4515. 22 7281 .63 90. 57 167. 71 4173 .83 4249. 93 2514 .81 4546. 77 7312 .24 90. 64 167. 81 4173 .51 4249. 61 2545 .42 4577. 38 7344 .32 90. 74 167. 53 4173 .12 4249. 22 2577 .50 4609. 46 7376 .65 90. 98 167 .49 4172 .64 4248. 74 2609 .82 4641. 79 7408 .94 90. 33 166 .87 4172 .27 4248. 37 2642 .11 4674. 07 7439 .97 88. 93 166 .14 4172 .47 4248. 57 2673 .13 4705. 10 7471 .11 90. 74 168 .16 4172 .56 4248. 66 2704 .26 4736. 24 7503 .25 91. 15 167 .39 4172 .03 4248. 13 2736 .39 4768. 38 7535 .46 91. 19 167 .95 4171 .37 4247. 47 2768 .60 4800. 58 7566 .29 90. 88 168 .30 4170 .82 4246. 92 2799 .42 4831. 41 7597 .30 91. 63 168 .96 4170 .14 4246. 24 2830 .42 4862. 41 7628 .58 91. 60 169 .10 4169 .25 4245. 35 2861 .68 4893. 68 7660 .18 91. 50 169 .00 4168 .40 4244. 50 2893 .27 4925. 26 7691 .83 91. 53 168 .16 4167 .56 4243. 66 2924 .90 4956. 90 7724 .02 91. 33 169 .16 4166 .76 4242. 86 2957 .08 4989. 08 7755 .78 91. 50 168 .11 4165 .98 4242. 08 2988 .83 5020. 83 7787 .53 90. 43 168 .54 4165 .44 4241. 54 3020 .57 5052. 58 7820 .00 87. 06 170 .28 4166 .15 4242. 25 3053 .02 5085. 04 7852 .19 86. 83 169 .37 4167 .87 4243. 97 3085 .15 5117. 18 7884 .23 86. 66 169 .65 4169 .69 4245. 79 3117 .13 5149. 17 7915 .88 86. 73 170 .38 4171 .51 4247. 61 3148 .70 5180. 77 2804.69 -2253.28 -1670.03 2824.29 -2283.31 -1662.25 2844.26 -2313.87 -1654.05 2864.61 -2344.48 -1646.03 2884.65 -2374.21 -1638.40 2905.05 -2404.40 -1630.38 2926.07 -2435.29 -1622.11 2946.75 -2465.56 -1613.80 2967.67 -2495.87 -1605.52 2989.48 -2526.92 -1597.40 3011.26 -2557.57 -1589.52 3032.70 -2587.59 -1581.67 3054.49 -2617.77 -1573.90 3075.99 -2647.37 -1566.25 3097.83 -2677.29 -1558.41 3120.79 -2708.75 -1549.83 3142.57 -2738.64 -1541.28 3165.47 -2769.53 -1532.92 3188.04 -2799.63 -1525.01 3210.66 -2829.45 -1517.42 3234.09 -2859.76 -1510.33 3258.20 -2890.57 -1503.48 3281.80 -2920.48 -1496.99 3306.62 -2951.82 -1490.14 3331.71 -2983.38 -1483.15 3356.77 -3014.86 -1475.98 3380.75 -3045.04 -1468.74 3405.14 -3075.39 -1461.82 3430.64 -3106.80 -1455.01 3456.27 -3138.26 -1448.14 3481.05 -3168.43 -1441.79 3506.23 -3198.82 -1435.68 3531.84 -3229.52 -1429.73 3557.82 -3260.53 -1423.73 3583.78 -3291.54 -1417.47 3610.30 -3323.09 -1411.14 3636.55 -3354.22 -1404.88 3662.79 -3385.31 -1398.46 3690.04 -3417.21 -1392.49 3717.23 -3448.85 -1386.82 3744.28 -3480.30 -1380.99 3771.22 -3511.42 -1375.51 0.60 5975810. 87 581485. 69 N 70. 34393518 W 149 .33863180 4.87 5975780. 92 581493. 80 N 70. 34385314 W 149. 33856862 2.07 5975750. 47 581502. 35 N 70. 34376968 W 149. 33850196 4.28 5975719. 95 581510. 70 N 70. 34368604 W 149. 33843687 2.70 5975690. 31 581518. 67 N 70. 34360483 W 149. 33837485 0.34 5975660. 20 581527. 02 N 70. 34352234 W 149. 33830973 0.56 5975629. 42 581535. 63 N 70. 34343797 W 149. 33824254 1.75 5975599. 24 581544. 27 N 70. 34335528 W 149. 33817512 11.15 5975569. 02 581552. 89 N 70. 34327247 W 149. 33810784 2.71 5975538. 08 581561. 35 N 70. 34318767 W 149. 33804186 0.66 5975507. 52 581569. 57 N 70. 34310395 W 149. 3379 1.42 5975477. 59 581577. 75 N 70. 34302193 W 149. 3379 2.64 5975447. 50 581585. 85 N 70. 34293949 W 149. 33785107 3.17 5975417. 99 581593. 83 N 70. 34285862 W 149. 33778892 2.22 5975388. 16 581602. 00 N 70. 34277689 W 149. 33772524 5.52 5975356. 80 581610. 92 N 70. 34269094 W 149. 33765558 1.76 5975327. 00 581619. 80 N 70. 34260928 W 149. 33758615 4.44 5975296. 21 581628. 51 N 70. 34252490 W 149. 33751826 1.73 5975266. 21 581636. 75 N 70. 34244268 W 149. 33745400 4.68 5975236. 48 581644. 67 N 70. 34236123 W 149. 33739236 4.05 5975206. 25 581652. 10 N 70. 34227841 W 149. 33733475 1.56 5975175. 52 581659. 29 N 70. 34219426 W 149. 33727912 0.40 5975145. 69 581666. 11 N 70. 34211254 W 149. 33722641 0.93 5975114. 43 581673. 31 N 70. 34202693 W 149. 33717078 0.75 5975082. 95 581680. 65 N 70. 34194072 W 149. 33711399 2.78 5975051. 55 581688. 16 N 70. 34185471 W 149. 33705581 5.09 5975021. 47 581695. 73 N 70. 34177229 W 149. 33699700 8.71 5974991. 19 581702. 99 N 70. 34168936 W 149. 33694076 2.71 5974959. 86 581710. 14 N 70. 34160356 W 149. 336 1.74 5974928. 49 581717. 37 N 70. 34151762 W 149. 8 3368 1.52 5974898. 39 581724. 05 N 70. 34143521 W 149. 33677813 3.22 5974868. 07 581730. 49 N 70. 34135219 W 149. 33672849 0.46 5974837. 45 581736. 78 N 70. 34126833 W 149. 33668016 0.45 5974806. 51 581743. 13 N 70. 34118361 W 149. 33663142 2.65 5974775. 57 581749. 73 N 70. 34109889 W 149. 33658054 3.17 5974744. 09 581756. 41 N 70. 34101269 W 149. 33652915 3.35 5974713. 04 581763. 01 N 70. 34092766 W 149. 33647834 3.63 5974682. 03 581769. 78 N 70. 34084273 W 149. 33642617 11.68 5974650. 19 581776. 10 N 70. 34075558 W 149. 33637772 2.91 5974618. 62 581782. 13 N 70. 34066915 W 149. 33633159 1.02 5974587. 24 581788. 30 N 70. 34058322 W 149. 33628429 2.31 5974556. 19 581794. 12 N 70. 34049821 W 149. 33623979 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205 drilling\L-205L4\L-204L4 Generated 8/4/2008 11:08 AM Page 4 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft B de 1100 ft ftUS ftUS /`J4/. 5Z 2f/ .4~ 7/"L3/ 41/3.12 4L4y .LL 318U. L0 ~CIL.JO J/`JO. 48 -JD4L .OL -13/V AV 7979. 32 87 .72 171. 50 4174 .46 4250 .56 3211. 98 5244 .14 3826. 10 -3574 .04 -1365 .77 8010. 17 89 .06 171. 46 4175 .32 4251 .42 3242. 76 5274 .97 3852. 99 -3604 .53 -1361 .20 8041. 82 90 .13 169. 71 4175 .55 4251 .65 3274. 37 5306 .62 3880. 40 -3635 .76 -1356 .02 8072. 39 87 .91 168. 81 4176 .07 4252 .17 3304. 93 5337 .19 3906. 58 -3665. 78 -1350 .33 8104. 45 87 .83 168. 41 4177 .26 4253 .36 3336. 96 5369 .22 3933. 90 -3697. 19 -1344 .00 8136. 27 85 .53 167. 45 4179 .11 4255 .21 3368. 73 5400 .99 3960. 86 -3728. 25 -1337 .36 8167. 54 86 .73 168. 70 4181 .22 4257 .32 3399. 93 5432 .19 3987. 45 -3758. 78 -1330 .91 8199. 84 88 .03 168. 17 4182. 69 4258 .79 3432. 19 5464 .45 4015. 12 -3790. 39 -1324 .45 8232. 17 88 .82 168. 65 4183 .58 4259 .68 3464. 51 5496 .77 4042. 90 -3822. 05 -1317 .95 8263. 66 89 .06 168. 41 4184 .16 4260 .26 3495. 99 5528 .25 4070. 06 -3852. 90 -1311 .69 8293. 93 88 .96 168. 52 4184 .69 4260 .79 3526. 25 5558 .52 4096. 21 -3882. 56 -1305 .64 8326. 05 89 .10 167. 83 4185 .23 4261 .33 3558. 37 5590 .63 4123. 94 -3913. 99 -1299 .06 8357. 66 89 .10 168. 52 4185 .73 4261 .83 3589. 98 5622 .24 4151. 29 -3944. 92 -1292 .58 8388. 99 88 .79 167. 02 4186. 30 4262 .40 3621. 30 5653 .57 4178. 34 -3975. 54 -1285 .95 8421. 56 88 .89 164. 59 4186. 96 4263 .06 3653. 84 5686 .13 4205. 96 -4007. 10 -1277 .96 8453. 08 89 .27 164. 45 4187. 47 4263 .57 3685. 29 5717 .64 4232. 37 -4037. 48 -1269 .55 8484. 77 90 .26 164. 41 4187. 60 4263 .70 3716. 92 5749 .33 4258. 98 -4068. 00 -1261 .04 8517. 00 90 .50 163. 63 4187. 39 4263 .49 3749. 07 5781 .56 4285. 98 -4098. 99 -1252 .17 8548. 32 89 .78 163. 17 4187. 31 4263 .41 3780. 29 5812 .88 4312. 11 -4129. 00 -1243 .22 8580. 57 89 .15 163. 40 4187. 61 4263 .71 3812. 43 5845 .13 4339. 04 -4159. 89 -1233 .95 8612. 80 90 .19 162. 59 4187. 80 4263 .90 3844. 54 5877 .36 4365. 95 -4190. 71 -1224 .52 8643. 38 89 .10 161. 43 4187. 99 4264 .09 3874. 95 5907 .94 4391. 25 -4219. 79 -1215 .08 J.O/ V~/'IVLJ.VJ 0.94 5974493.69 4.35 5974463.25 6.48 5974432.09 7.84 5974402.13 1.27 5974370.80 7.83 5974339.81 5.53 5974309.37 4.35 5974277.83 2.86 5974246.25 1.08 5974215.47 0.49 5974185.89 2.19 5974154.53 2.18 5974123.67 4.89 5974093.14 7.47 5974061.66 1.28 5974031.39 3.13 5974000.96 2.53 5973970.08 2.73 5973940.17 2.08 5973909.39 4.09 5973878.68 5.21 5973849.71 .701 / AA.'40 IY ! V.JYVY IL.70 YY IY.7.JJV IAAVO 581804.56 N 70.34032716 W 149.33616064 581809.46 N 70.34024384 W 149.33612353 581814.99 N 70.34015855 W 149.33608147 581821.01 N 70.34007652 W 149.33603522 581827.69 N 70.33999072 W 149.33598383 581834.67 N 70.33990587 W 149.33592990 581841.46 N 70.33982248 W 149.33587755 581848.28 N 70.33973613 W 149.33582502 581855.12 N 70.33964964 W 149.33577230 581861.72 N 70.33956535 W 149.33572145 581868.10 N 70.33948434 W 149.3356 581875.03 N 70.33939847 W 149.3356 581881.85 N 70.33931396 W 149.33556627 581888.82 N 70.33923033 W 149.33551239 581897.16 N 70.33914410 W 149.33544756 581905.90 N 70.33906113 W 149.33537927 581914.75 N 70.33897774 W 149.33531022 581923.96 N 70.33889310 W 149.33523819 581933.24 N 70.33881110 W 149.33516555 581942.86 N 70.33872673 W 149.33509026 581952.62 N 70.33864254 W 149.33501375 581962.39 N 70.33856309 W 149.33493708 8674.11 88.17 159.47 4188.72 4264.82 3905.40 5938.66 4416.26 -4248.74 -1204.80 7.06 5973820.88 Last Survey 8707.26 87.04 160.02 4190.10 4266.20 3938.18 5971.78 4443.06 -4279.81 -1193.33 3.79 5973789.94 TD (Projected) 8763.00 87.04 160.02 4192.98 4269.08 3993.31 6027.45 4488.47 -4332.13 -1174.31 0.00 5973737.84 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) INC+TREND - (Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model.) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Lestlal Description: Northinstl (YI fftUSl Eastino IX) fftUSl Surface : 2361 FSL 3786 FEL S34 T12N R11E UM 5978082.32 583130.47 BHL : 3309 FSL 4969 FEL S3 T11N R11E UM 5973737.84 582004.39 581972.99 N 70.33848401 W 149.33485364 581984.80 N 70.33839913 W 149.33476058 582004.39 N 70.33825622 W 149.33460619 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205 drilling\L-205L4\L-204L4 Generated 8/4/2008 11:08 AM Page 5 of 5 TREE= a-u1s" WELLHEAD = FMC GEN 5 ACTUATOR = LEO KB. a.EV = 7s.1o' DRLG DR BF. ELEV = 74.38' KOP = 300' " Max Angle = 20 CONDUCTOR, Datum MD = ° ~ ' 129#, X-56, Datum ND = 4400'. SS D = 19.124" L-205 AFT (L1, L2, L3, L4, L5) 2400' ~~4-1/2" HES X NIP, D = 3.813" 10-3/4" CSG, 45.5#, L-80 BTC, D = 9.95" 3026' 7 5/8" CSG, 29.7#, L-80 TCII XO TO BTGM 4366' PRESSURE GA UGE, D = 3.864 ~-~ 4441' ®JTAKEPRESSGAUGE,D=3.864" ~-1 4480' Minimum ID = 3.813" ~ 2400' JEWELRY TYPE "X "Nipple 7-5/8" X 5-1/2" BKR ZXP LTP(f"IIXK, D = 5.75" 4604' 4-112" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, D = 3.958" BAKER HOOK HALER ASSY w/ L3 SEALING LEM, D = 3.688" 7-5/8" RA T AG ~-~ 4726' I LEM #3 LOWER SEAL ASSY, D = 3.890" I 4KER HOOK HANGER ASSY / L2 SEALNG LEM, D = 3.688" 7-5/8" RA TAG ~-{ 4942' ~ LEM #2 LOWER SEAL ASSY, D = 3.890" ~ (BAKERHOOKHANGERASSY I w / L3 SEALING LEM, D = 3.688" -5/8" RA T AG ~ LEM #1 LOWER SEAL ASSY, D = 3.88" ~ ST MD ND DEV TYPE VLV LATCH PORT DATE 4 2761 2518 33 KBG-2 DMY SBK-2C 0 07/06/08 3 3915 3504 30 KBG-2 DMY SBK-2C 0 07/06/08 2 4126 3686 33 KBG-2 OCK BIX 0 07/06/08 1 4339 3859 38 KBG-2 DMY SBK-2C 0 07/06/08 4456' 4-1/2" Baker CMD SLD SLEEVE, D = 3.813" 4542' 7-5l8" X 4-1/2" BKR PRM PKR, D = 3.875" 4$$$' 45$9' 4-112" HES X NIP, w /RHGM Plug D = 3.813" 4-1/2" HES X NIP, D = 3.813" 461 Z' -~4-1/2" WLEG, D=3.958" 4624' 5-1/2" X 4-1/2" XO, ID = 3.958" _ ® ea L5 (Nb) LEM WINDOW 47° L5 N b -~- as4o' • 4ssr ( ) 4-112" RA TAG ~ _6522_ I ~~ _ _ _ ~~- _ _ _ I OPENNG WIDTH = 3.64" 4~1 7-5/8" X 5-1/2" BKR ZXP LTP/TIEBK, D = 4.950" 19-1 /2' SEAL BORE EXTENSION, D = 4.75" 4819' ~ 5-1l2" X 4-1/2" X0. D = 3.958" ® ea .ems e~ L4 (OA) LEM WINDOW 56° ar---- L4 (OA) 4-1/2" RA TAG (a~ _6897_ 4841'-4852' --~r~r - - - ~e~- ' ' ' OPENNG WDTH = 3.64" --~ 4~' ~ 7-5/8" X 5-112" BKR ZXP LTP/TIEBK, D = 5.75" 19-1l2' SEAL BORE EXTENSION, D = 4.75" ~ 4982' ~--~ 5-112" X 4-1/2" XO. D= 3.958" i ea - - - r® - - L3(OBa) LEM WBVDOW 62° L3 (OBa) 4-1n° RA TAG (c~ _7356_ I 5003'-5014' ~~- - - - ~-®- - - - OPENNG WIDTH =_3.64" -~~' ~ 7-5/8" X 5-1 /2" BKR ZXP LTP/TEBK, D = 5.750" ~ 19' SEAL BORE IXTENSION, D = 4.75" ~ 5/8" CSG, 29.7#, L-80 BTGM, D = 6.875" 5582' I I ~ 5151' S-1 /2" X 4-1 /2" XO. D = 3.958" I I I I L-205 (OBb) - I 1 PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: WA Note: Refer to Production DB for historical pert data I SIZE ~ SPF ( IVTERVAL ~ Opn/Sq2 ~ DATE ~ SEE PAGE 2 FOR PERFORATION INFORMATION I 5813' 6" WFD FLOW THRU ALUMINUM BELET LNR ® ' . (BBiIND SLOTT®LINBO ~ ~ ~ L1(OBc) - - - - ~ -----~ i 5751' 6" WFD FLOW THRU ALUMNUM B~LET LNR (BEFBND SLOTT®LINER) L2 4-1/2" SOLD LNR, 12.6#, L-80, 8957' low) .0152 bpf, D = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNR 07/08/08 N9ES ORIGINAL COMPLETION WELL: L-205 PERMff No: 2080530 (540) (580) (550) (560) (570) API No: 50-029-23388-00 (60) (64) (61) (62) (63) SEC 34, T12N, R11E, 2361' FSL & 1493' FLW BP Exploration (Alaska) L-205 (L1, L2, L3, L4, L5) PERFORATION SUNInAARY REF LOG: A NGLE AT TOP PERF: WA Note: Refer to Productan DB for historical perf data SQE SPF ZONE gVTERVAL Opn/Sqz DATE SLTD Nb 8574-7060 6522-5480 Open 07/07/08 SLTD OA 8708-7444 6897-5320 Open 07/07/08 SLTD OBa 8797-7918 7356-5477 Open 07/07/08 SLTD Ot3b 8909-6382 Open 07/07/08 SLTD OBc 8948-6412 Open 07/07/08 SLTD OBd 8885-8020 7500-5912 5827-5594 Open 7/7/2008 4-1/2" RA TAG 5846' l 4-1/2" SWELL PACKER, ID = 3.900" 5$64' 4-1/2" SWELL PKR Q 5842', ~ = 3.9" 4-1 /2" SWELL PKR ~ 6115', ~ = 3.9" ------~- DATE REV BY COMMENTS DATE REV BY COMv~YTS ORION UNfT 07/08/08 NBES ORIGINAL COMPLETION 1NELL: L-205 PERMIT No: 2080530 (540) (580) (550) (560) (570) API No: 50-029-23388-00 (60) (64) (61) (62) (63) SEC 34, T12N, R11E, 2361' FSL 8~ 1493' FLW BP Exploration (Alaska) Nb PBTD 8618' 4-1/2" SWELL PKR @4704' ,5449 ',6540 ' 8~ 7035', ~ = 3.9" ~ ~ ~----T ®----- 4-1/2" SWELL PKR (i~ 4925' ,5279 ',6915' & 7419', ID = 3.9" 4-1/2" SWELL PKR (c~ 5045' , 5419', 7373' 8 7892', ®= 3.9 d O~ O s SCHLUMBERGER Survey report Client ...................: BPXA Field ..................... Orion Well .....................: L-205L4 API number ...............: 50-029-23388-62 Engineer .................. D. Ziegahn COUNTY :................... Nabors 9ES STATE :...................: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: ------------------ Mean Sea Level Driller's Pipe Tally 47.60 ft N/A Top Drive 76.10 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 168.00 degrees [(c)2008 IDEAL ID13_OC_08] 27-Jun-2008 18:50:46 Page 1 of 7 Spud date ................: 27-Apr-08 Last survey date.........: 27-Jun-08 Total accepted surveys...: 177 MD of first survey.......: 0.00 ft MD of last survey........: 8763.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2007 Magnetic date ............: 23-Jun-2008 Magnetic field strength..: 57652.37 GAMA Magnetic dec (+E/W-).....: 22.89 degrees Magnetic dip .............: 80.89 degrees ----- MWD survey Reference Reference G ..............: Reference H ............... Reference Dip ............. Tolerance of G...........: Tolerance of H............ Tolerance of Dip.........: Criteria --------- 1002.68 meal 57652.50 GAMA 80.89 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections -------------------------- Magnetic dec (+E/W-).....: 22.89 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 22.89 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • SCHLUMBERGER Survey Report 30-Jun-2008 12:42:56 Page 2 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.57 217.96 100.00 100.00 0.32 -0.39 -0.31 0.50 217.96 0.57 BP_GYD_ SS 3 181.00 0.86 102.64 81.00 180.99 0.83 -0.84 0.04 0.84 177.33 1.50 BP_GYD _SS 4 275.00 1.76 66.92 94.00 274.97 0.85 -0.43 2.06 2.10 101.85 1.25 BP_GYD _SS 5 366.00 0.89 343.53 91.00 365.95 -0.12 0.79 3.14 3.24 75.81 2.06 BP_GYD _SS 6 459.00 1.97 257.97 93.00 458.93 -0.84 1.15 1.37 7 551.00 3.36 217.40 92.00 550.83 0.91 -1.32 -1.81 8 644.00 5.70 201.25 93.00 643.54 6.55 -7.79 -5.14 9 736.00 7.65 210.60 92.00 734.92 14.88 -17.32 -9.92 10 835.00 8.60 223.39 99.00 832.93 23.93 -28.37 -18.36 11 935.00 9.75 241.75 100.00 931.67 30.55 -37.81 -30.95 12 1035.00 13.48 249.51 100.00 1029.61 34.64 -45.91 -49.34 13 1115.00 16.16 253.08 80.00 1106.94 36.98 -52.41 -68.73 14 1136.89 16.70 254.64 21.89 1127.94 37.42 -54.13 -74.67 15 1258.24 22.93 265.48 121.35 1242.09 35.36 -60.62 -115.11 16 1326.92 24.06 268.62 68.68 1305.07 31.04 -62.01 -142.44 17 1421.68 27.17 270.67 94.76 1390.51 22.73 -62.22 -183.40 18 1516.50 30.08 271.97 94.82 1473.73 12.25 -61.15 -228.80 19 1611.33 32.06 273.04 94.83 1554.96 -0.02 -59.00 -277.69 20 1707.20 31.09 272.76 95.87 1636.63 -12.93 -56.46 -327.83 21 1801.84 32.49 272.47 94.64 1717.07 -25.51 -54.19 -377.63 22 1896.82 32.42 273.61 94.98 1797.22 -38.74 -51.49 -428.53 23 1992.43 33.98 273.42 95.61 1877.22 -52.74 -48.28 -480.78 24 2087.04 33.75 273.91 94.61 1955.78 -66.97 -44.91 -533.39 25 2181.62 33.61 271.96 94.58 2034.49 -80.49 -42.22 -585.77 26 2274.74 33.39 272.09 93.12 2112.14 -92.94 -40.41 -637.13 27 2367.93 33.39 272.47 93.19 2189.95 -105.59 -38.37 -688.37 28 2462.46 33.02 270.42 94.53 2269.04 -117.63 -37.06 -740.12 29 2557.63 33.63 270.02 95.17 2348.56 -128.70 -36.86 -792.40 30 2651.46 33.98 270.29 93.83 2426.53 -139.69 -36.71 -844.61 1.79 49.95 2.24 233.97 9.33 213.43 19.96 209.79 33.79 212.90 48.87 219.30 67.39 227.06 86.43 232.67 92.23 234.06 130.09 242.23 155.35 246.47 193.67 251.26 236.83 255.04 283.89 258.00 332.65 260.23 381.50 261.83 431.61 263.15 483.20 264.27 535.28 265.19 587.29 265.88 638.41 266.37 689.44 266.81 741.05 267.13 793.26 267.34 845.40 267.51 2.26 BP_ GYD _SS 2.46 BP_ GYD _SS 2.84 BP_ GYD _SS 2.42 BP_ GYD _SS 2.06 BP_ GYD _SS 3.13 BP_ GYD_SS 4.04 BP_ GYD_SS 3.54 BP_ GYD_SS 3.19 BP_ MWD+IFR+MS 5.94 BP_ MWD+IFR+MS 2.45 BP_MWD+IFR+MS 3.41 BP_MWD+IFR+MS 3.14 BP_MWD+IFR+MS 2.17 BP_MWD+IFR+MS 1.02 BP_MWD+IFR+MS 1.49 BP_MWD+IFR+MS 0.65 BP_MWD+IFR+MS 1.64 BP_MWD+IFR+MS 0.38 BP_MWD+IFR+MS 1.15 BP_MWD+IFR+MS 0.25 BP_MWD+IFR+MS 0.22 BP_MWD+IFR+MS 1.25 BP_MWD+IFR+MS 0.68 BP_MWD+IFR+MS 0.41 BP_MWD+IFR+MS • [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 30-Jun-2008 12:42:56 Page 3 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ --- 31 -------- 2746.02 ------ 33.40 ------- 270.56 ------ 94.56 -------- 2505.21 -------- -150.98 ------- -36.33 --------- -897.06 ------- 897.79 -------- 267.68 ----- 0.63 - BP ---- ------ _MWD+IFR+MS 32 2842.54 33.47 270.62 96.52 2585.76 -162.57 -35.78 -950.24 950.91 267.84 0.08 BP _MWD+IFR+MS 33 2937.92 33.60 270.76 95.38 2665.26 -174.14 -35.14 -1002.92 1003.54 267.99 0.16 BP _MWD+IFR+MS 34 2967.43 33.62 270.56 29.51 2689.84 -177.72 -34.96 -1019.26 1019.86 268.04 0.38 BP _MWD+IFR+MS 35 3107.78 31.53 273.30 140.35 2808.11 -195.86 -32.46 -1094.76 1095.24 268.30 1.82 BP _MWD+IFR+MS 36 3203.61 31.04 273.04 95.83 2890.00 -208.88 -29.71 -1144.45 1144.83 268.51 0.53 BP _MWD+IFR+MS 37 3297.38 30.81 272.91 93.77 2970.44 -221.34 -27.21 -1192.57 1192.88 268.69 0.26 BP _MWD+IFR+MS 38 3392.05 30.68 272.74 94.67 3051.81 -233.72 -24.82 -1240.91 1241.16 268.85 0.17 BP _MWD+IFR+MS 39 3487.43 31.05 272.49 95.38 3133.68 -246.06 -22.59 -1289.79 1289.99 269.00 0.41 BP _MWD+IFR+MS 40 3582.92 30.87 268.82 95.49 3215.57 -256.83 -22.03 -1338.89 1339.07 269.06 1.99 BP _MWD+IFR+MS 41 3678.31 29.99 263.26 95.39 3297.84 -263.61 -25.33 -1387.04 1387.28 268.95 3.09 BP _MWD+IFR+MS 42 3772.61 29.22 254.87 94.30 3379.86 -264.51 -34.11 -1432.69 1433.09 268.64 4.47 BP _MWD+IFR+MS 43 3866.93 28.77 247.68 94.32 3462.39 -259.19 -48.74 -1475.92 1476.73 268.11 3.72 BP _MWD+IFR+MS 44 3962.10 29.80 240.93 95.17 3545.41 -248.14 -68.93 -1517.79 1519.36 267.40 3.63 BP _MWD+IFR+MS 45 4055.92 30.62 236.90 93.82 3626.50 -232.69 -93.31 -1558.19 1560.98 266.57 2.33 BP _MWD+IFR+MS 46 4150.19 33.73 229.21 94.27 3706.32 -211.43 -123.54 -1598.14 1602.91 265.58 5.45 BP _MWD+IFR+MS 47 4243.84 36.39 222.26 93.65 3783.00 -182.66 -161.11 -1636.53 1644.44 264.38 5.12 BP _MWD+IFR+MS 48 4339.08 38.26 217.52 95.24 3858.75 -147.01 -205.42 -1673.50 1686.06 263.00 3.60 BP _MWD+IFR+MS 49 4434.10 40.45 214.68 95.02 3932.22 -106.75 -254.11 -1708.97 1727.76 261.54 2.98 BP _MWD+IFR+MS 50 4527.38 43.34 211.09 93.28 4001.66 -62.60 -306.43 -1742.73 1769.46 260.03 4.02 BP _MWD+IFR+MS 51 4621.75 46.89 207.11 94.37 4068.26 -12.20 -364.85 -1775.16 1812.27 258.39 4.80 BP _MWD+IFR+MS 52 4716.23 50.92 201.83 94.48 4130.37 45.07 -429.65 -1804.54 1854.98 256.61 5.99 BP _MWD+IFR+MS 53 4812.65 54.90 197.34 96.42 4188.53 110.59 -502.09 -1830.23 1897.85 254.66 5.55 BP _MWD+IFR+MS 54 4841.00 56.00 195.89 28.35 4204.61 131.09 -524.46 -1836.90 1910.31 254.07 5.73 BP _BLIND 55 4853.00 57.80 195.10 12.00 4211.16 140.00 -534.15 -1839.59 1915.57 253.81 15.98 BP _BLIND 56 4875.08 58.41 195.10 22.08 4222.83 156.69 -552.25 -1844.47 1925.37 253.33 2.76 BP _INC+TREND 57 4909.98 62.20 194.25 34.90 4240.11 183.78 -581.57 -1852.15 1941.31 252.57 11.06 BP _INC+TREND 58 4941.80 66.40 193.47 31.82 4253.91 209.58 -609.40 -1859.01 1956.35 251.85 13.38 BP _INC+TREND 59 4972.92 71.53 192.72 31.12 4265.07 235.87 -637.69 -1865.59 1971.56 251.13 16.64 BP _INC+TREND 60 5004.99 74.91 191.94 32.07 4274.33 263.85 -667.68 -1872.14 1987.64 250.37 10.79 BP _INC+TREND • r 1 LJ [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 30- Jun-2008 12:42:56 Page 4 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5035.55 80.07 191.19 30.56 4280.95 291.18 -696.90 -1878.12 2003.24 249.64 17.05 BP _INC+TREND 62 5067.27 83.51 190.43 31.72 4285.48 320.12 -727.73 -1884.00 2019.67 248.88 11.10 BP _INC+TREND 63 5099.61 86.81 189.60 32.34 4288.21 349.99 -759.46 -1889.61 2036.51. 248.10 10.52 BP _INC+TREND 64 5130.40 90.16 189.31 30.79 4289.02 378.63 -789.82 -1894.66 2052.69 247.37 10.92 BP _INC+TREND 65 5162.26 92.80 187.84 31.86 4288.20 408.45 -821.30 -1899.41 2069.37 246.62 9.48 BP _MWD+IFR+MS • 66 5194.48 95.72 186.85 32.22 4285.80 438.76 -853.17 -1903.52 2085.97 245.86 9.57 BP _MWD+IFR+MS 67 5225.94 99.15 184.66 31.46 4281.73 468.46 -884.20 -1906.65 2101.69 245.12 12.90 BP _MWD+IFR+MS 68 5257.95 100.92 183.42 32.01 4276.16 498.75 -915.64 -1908.87 2117.11 244.37 6.72 BP _MWD+IFR+MS 69 5289.20 101.10 181.65 31.25 4270.19 528.45 -946.28 -1910.23 2131.76 243.65 5.59 BP _MWD+IFR+MS 70 5319.49 100.75 178.91 30.29 4264.45 557.50 -976.02 -1910.37 2145.26 242.94 8.96 BP _MWD+IFR+MS 71 5351.06 99.25 175.43 31.57 4258.96 588.19 - 1007.07 -1908.83 2158.20 242.18 11.85 BP _MWD+IFR+MS 72 5384.71 95.93 174.39 33.65 4254.52 621.30 - 1040.29 -1905.87 2171.30 241.37 10.33 BP _MWD+IFR+MS 73 5415.53 92.82 175.03 30.82 4252.17 651.81 - 1070.88 -1903.04 2183.66 240.63 10.30 BP _MWD+IFR+MS 74 5447.80 93.55 174.48 32.27 4250.37 683.81 - 1102.97 -1900.10 2197.02 239.87 2.83 BP _MWD+IFR+MS 75 5479.76 92.73 173.90 31.96 4248.62 715.54 - 1134.71 -1896.87 2210.36 239.11 3.14 BP _MWD+IFR+MS 76 5511.15 90.34 173.04 31.39 4247.78 746.77 - 1165.89 -1893.30 2223.48 238.38 8.09 BP _MWD+IFR+MS 77 5543.24 90.78 171.65 32.09 4247.47 778.77 - 1197.69 -1889.02 2236.71 237.62 4.54 BP _MWD+IFR+MS 78 5575.43 91.19 170.64 32.19 4246.92 810.90 - 1229.49 -1884.07 2249.75 236.87 3.39 BP _MWD+IFR+MS 79 5606.40 9.1.77 172.74 30.97 4246.12 841.80 - 1260.12 -1879.59 2262.91 236.16 7.03 BP _MWD+IFR+MS 80 5638.72 91.60 171.28 32.32 4245.17 874.02 - 1292.11 -1875.10 2277.18 235.43 4.55 BP _MWD+IFR+MS • 81 5670.13 92.32 170.36 31.41 4244.09 905.37 - 1323.10 -1870.10 2290.82 234.72 3.72 BP _MWD+IFR+MS 82 5701.48 91.36 169.46 31.35 4243.09 936.69 - 1353.95 -1864.61 2304.33 234.02 4.20 BP _MWD+IFR+MS 83 5733.01 89.79 168.50 31.53 4242.77 968.21 - 1384.90 -1858.58 2317.81 233.31 5.84 BP _MWD+IFR+MS 84 5765.41 90.09 168.33 32.40 4242.80 1000.61.- 1416.64 -1852.07 2331.74 232.59 1.06 BP _MWD+IFR+MS 85 5795.93 90.43 168.34 30.52 4242.66 1031.13 - 1446.53 -1845.90 2345.16 231.92 1.11 BP _MWD+IFR+MS 86 5827.66 90.71 167.33 31.73 4242.35 1062.86 - 1477.54 -1839.22 2359.20 231.22 3.30 BP _MWD+IFR+MS 87 5859.89 91.46 168.41 32.23 4241.74 1095.08 - 1509.05 -1832.44 2373.83 230.53 4.08 BP _MWD+IFR+MS 88 5891.39 91.81 168.13 31.50 4240.84 1126.57 - 1539.88 -1826.04 2388.65 229.86 1.42 BP _MWD+IFR+MS 89 5923.38 91.87 167.22 31.99 4239.81 1158.54 - 1571.11 -1819.22 2403.74 229.19 2.85 BP _MWD+IFR+MS 90 5955.34 92.25 167.25 31.96 4238.66 1190.48 - 1602.26 -1812.16 2418.92 228.52 1.19 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 30-Jun-2008 12:42:56 Page 5 of 7 --- --- Seq -------- -------- Measured ------ ------ Intl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) ------- (ft) - -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- type (deg) ----- ------ 91 5987.13 92.32 167.60 31.79 4237.40 1222.24 -1633.26 - 1805.25 2434.43 227.86 1.12 BP _MWD+IFR+MS 92 6019.37 92.39 167.04 32.24 4236.07 1254.45 -1664.69 - 1798.17 2450.43 227.21 1.75 BP _MWD+IFR+MS 93 6051.34 92.08 167.29 31.97 4234.82 1286.39 -1695.84 - 1791.08 2466.54 226.56 1.25 BP _MWD+IFR+MS 94 6082.65 92.22 167.48 31.31 4233.65 1317.68 -1726.37 - 1784.25 2482.72 225.94 0.75 BP _MWD+IFR+MS 95 6114.10 92.70 167.54 31.45 4232.30 1349.10 -1757.05 - 1777.45 2499.31 225.33 1.54 BP _MWD+IFR+MS • 96 6145.84 93.08 167.88 31.74 4230.70 1380.80 -1788.02 - 1770.70 2516.43 224.72 1.61 BP _MWD+IFR+MS 97 6177.67 89.93 167.83 31.83 4229.86 1412.61 -1819.12 - 1764.01 2533.96 224.12 9.90 BP _MWD+IFR+MS 98 6209.39 88.69 168.61 31.72 4230.25 1444.33 -1850.17 - 1757.53 2551.87 223.53 4.62 BP _MWD+IFR+MS 99 6241.41 89.20 168.65 32.02 4230.83 1476.34 -1881.56 - 1751.22 2570.42 222.95 1.60 BP _MWD+IFR+MS 100 6273.23 89.10 169.00 31.82 4231.31 1508.16 -1912.77 - 1745.06 2589.19 222.37 1.14 BP _MWD+IFR+MS 101 6304.11 89.03 169.04 30.88 4231.81 1539.03 -1943.08 - 1739.18 2607.74 221.83 0.26 BP _MWD+IFR+MS 102 6336.14 88.99 168.08 32.03 4232.36 1571.05 -1974.47 - 1732.82 2627.02 221.27 3.00 BP _MWD+IFR+MS 103 6367.35 88.17 168.87 31.21 4233.14 1602.25 -2005.04 - 1726.59 2646.00 220.73 3.65 BP _MWD+IFR+MS 104 6399.38 86.35 168.89 32.03 4234.67 1634.24 -2036.43 - 1720.42 2665.88 220.19 5.68 BP _MWD+IFR+MS 105 6432.53 86.94 169.32 33.15 4236.61 1667.32 -2068.93 - 1714.16 2686.79 219.64 2.20 BP _MWD+IFR+MS 106 6463.25 86.29 168.36 30.72 4238.42 1697.99 -2099.02 - 1708.23 2706.27 219.14 3.77 BP _MWD+IFR+MS 107 6495.13 87.07 167.18 31.88 4240.27 1729.81 -2130.12 - 1701.49 2726.26 218.62 4.43 BP _MWD+IFR+MS 108 6526.84 87.86 165.11 31.71 4241.67 1761.47 -2160.88 - 1693.90 2745.67 218.09 6.98 BP _MWD+IFR+MS 109 6558.69 87.72 165.60 31.85 4242.90 1793.26 -2191.67 - 1685.85 2765.05 217.57 1.60 BP _MWD+IFR+MS 110 6590.32 87.83 165.55 31.63 4244.13 1824.84 -2222.28 - 1677.98 2784.63 217.06 0.38 BP _MWD+IFR+MS • 111 6622.35 87.69 165.68 32.03 4245.38 1856.82 -2253.28 - 1670.03 2804.69 216.54 0.60 BP _MWD+IFR+MS 112 6653.42 86.23 165.28 31.07 4247.03 1887.82 -2283.31 - 1662.25 2824.29 216.05 4.87 BP _MWD+IFR+MS 113 6685.12 86.42 164.65 31.70 4249.06 1919.41 -2313.87 - 1654.05 2844.26 215.56 2.07 BP _MWD+IFR+MS 114 6716.83 86.45 166.01 31.71 4251.03 1951.02 -2344.48 - 1646.03 2864.61 215.07 4.28 BP _MWD+IFR+MS 115 6747.58 86.52 165.18 30.75 4252.92 1981.68 -2374.21 - 1638.40 2884.65 214.61 2.70 BP _MWD+IFR+MS 116 6778.88 86.56 165.08 31.30 4254.80 2012.89 -2404.41 - 1630.38 2905.05 214.14 0.34 BP _MWD+IFR+MS 117 6810.91 86.66 164.93 32.03 4256.70 2044.82 -2435.29 - 1622.10 2926.07 213.67 0.56 BP _MWD+IFR+MS 118 6842.35 86.81 164.40 31.44 4258.49 2076.15 -2465.56 - 1613.80 2946.75 213.21 1.75 BP _MWD+IFR+MS 119 6873.79 90.26 165.03 31.44 4259.29 2107.53 -2495.88 - 1605.52 2967.67 212.75 11.15 BP _MWD+IFR+MS 120 6905.88 90.88 165.64 32.09 4258.97 2139.58 -2526.92 - 1597.40 2989.48 212.30 2.71 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 30-Jun-2008 12:42:56 Page 6 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 6937.53 91.05 165.52 31.65 4258.44 2171.20 -2557.57 -1589.52 3011.26 211.86 0.66 BP _MWD+IFR+MS 122 6968.57 91.33 165.18 31.04 4257.80 2202.20 -2587.59 -1581.67 3032.70 211.44 1.42 BP _MWD+IFR+MS 123 6999.74 91.56 165.97 31.17 4257.01 2233.33 -2617.77 -1573.90 3054.49 211.02 2.64 BP _MWD+IFR+MS 124 7030.33 91.84 165.04 30.59 4256.10 2263.88 -2647.37 -1566.25 3075.99 210.61 3.17 BP _MWD+IFR+MS 125 7061.28 92.25 165.59 30.95 4255.00 2294.77 -2677.29 -1558.41 3097.83 210.20 2.22 BP _MWD+IFR+MS • 126 7093.91 91.60 163.91 32.63 4253.90 2327.33 -2708.75 -1549.83 3120.79 209.78 5.52 BP _MWD+IFR+MS 127 7125.01 91.12 164.17 31.10 4253.16 2358.35 -2738.65 -1541.28 3142.57 209.37 1.76 BP _MWD+IFR+MS 128 7157.02 91.50 165.54 32.01 4252.43 2390.30 -2769.53 -1532.92 3165.47 208.96 4.44 BP _MWD+IFR+MS 129 7188.15 91.50 165.00 31.13 4251.62 2421.38 -2799.63 -1525.01 3188.04 208.58 1.73 BP _MWD+IFR+MS 130 7218.93 91.53 166.44 30.78 4250.80 2452.13 -2829.45 -1517.42 3210.66 208.20 4.68 BP _MWD+IFR+MS 131 7250.07 90.54 167.22 31.14 4250.24 2483.26 -2859.76 -1510.33 3234.09 207.84 4.05 BP _MWD+IFR+MS 132 7281.63 90.57 167.71 31.56 4249.93 2514.81 -2890.57 -1503.48 3258.20 207.48 1.56 BP _MWD+IFR+MS 133 7312.24 90.64 167.81 30.61 4249.61 2545.42 -2920.48 -1496.99 3281.80 207.14 0.40 BP _MWD+IFR+MS 134 7344.32 90.74 167.53 32.08 4249.22 2577.50 -2951.82 -1490.14 3306.62 206.79 0.93 BP _MWD+IFR+MS 135 7376.65 90.98 167.49 32.33 4248.74 2609.82 -2983.38 -1483.15 3331.71 206.43 0.75 BP _MWD+IFR+MS 136 7408.94 90.33 166.87 32.29 4248.37 2642.11 -3014.86 -1475.98 3356.77 206.08 2.78 BP _MWD+IFR+MS 137 7439.97 88.93 166.14 31.03 4248.57 2673.13 -3045.04 -1468.74 3380.75 205.75 5.09 BP _MWD+IFR+MS 138 7471.11 90.74 168.16 31.14 4248.66 2704.26 -3075.39 -1461.82 3405.14 205.42 8.71 BP _MWD+IFR+MS 139 7503.25 91.15 167.39 32.14 4248.13 2736.39 -3106.80 -1455.01 3430.64 205.10 2.71 BP _MWD+IFR+MS 140 7535.46 91.19 167.95 32.21 4247.47 2768.60 -3138.26 -1448.14 3456.27 204.77 1.74 BP _MWD+IFR+MS • 141 7566.29 90.88 168.30 30.83 4246.92 2799.42 -3168.43 -1441.79 3481.05 204.47 1.52 BP _MWD+IFR+MS 142 7597.30 91.63 168.96 31.01 4246.24 2830.42 -3198.82 -1435.68 3506.23 204.17 3.22 BP _MWD+IFR+MS 143 7628.58 91.60 169.10 31.28 4245.35 2861.68 -3229.52 -1429.73 3531.84 203.88 0.46 BP _MWD+IFR+MS 144 7660.18 91.50 169.00 31.60 4244.50 2893.27 -3260.53 -1423.73 3557.82 203.59 0.45 BP _MWD+IFR+MS 145 7691.83 91.53 168.16 31.65 4243.66 2924.91 -3291.54 -1417.47 3583.78 203.30 2.65 BP _MWD+IFR+MS 146 7724.02 91.33 169.16 32.19 4242.86 2957.08 -3323.09 -1411.14 3610.30 203.01 3.17 BP _MWD+IFR+MS 147 7755.78 91.50 168.11 31.76 4242.08 2988.83 -3354.22 -1404.88 3636.55 202.73 3.35 BP _MWD+IFR+MS 148 7787.53 90.43 168.54 31.75 4241.54 3020.57 -3385.31 -1398.46 3662.79 202.45 3.63 BP _MWD+IFR+MS 149 7820.00 87.06 170.28 32.47 4242.25 3053.02 -3417.21 -1392.49 3690.04 202.17 11.68 BP _MWD+IFR+MS 150 7852.19 86.83 169.37 32.19 4243.97 3085.15 -3448.85 -1386.82 3717.23 201.91 2.91 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 30-Jun-2008 12:42:56 Page 7 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) ------- (ft) - -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 151 -------- 7884.23 ------ 86.66 ------- 169.65 ------ 32.04 ------- 4245.79 - -------- 3117.13 ------- -3480.30 --------- -1380.99 -------- 3744.28 ------- 201.64 ----- 1.02 - BP ---- ------ _MWD+IFR+MS 152 7915.88 86.73 170.38 31.65 4247.61 3148.70 -3511.42 -1375.51 3771.22 201.39 2.31 BP _MWD+IFR+MS 153 7947.52 87.45 171.37 31.64 4249.22 3180.26 -3542.62 -1370.50 3798.48 201.15 3.87 BP _MWD+IFR+MS 154 7979.32 87.72 171.50 31.80 4250.56 3211.98 -3574.04 -1365.77 3826.10 200.91 0.94 BP _MWD+IFR+MS 155 8010.17 89.06 171.46 30.85 4251.42 3242.76 -3604.53 -1361.20 3852.99 200.69 4.35 BP _MWD+IFR+MS S 156 8041.82 90.13 169.71 31.65 4251.65 3274.37 -3635.76 -1356.02 3880.40 200.45 6.48 BP _MWD+IFR+MS 157 8072.39 87.91 168.81 30.57 4252.17 3304.93 -3665.78 -1350.33 3906.58 200.22 7.84 BP _MWD+IFR+MS 158 8104.45 87.83 168.41 32.06 4253.36 3336.96 -3697.19 -1344.00 3933.90 199.98 1.27 BP _MWD+IFR+MS 159 8136.27 85.53 167.45 31.82 4255.21 3368.73 -3728.25 -1337.36 3960.86 199.73 7.83 BP _MWD+IFR+MS 160 8167.54 86.73 168.70 31.27 4257.32 3399.93 -3758.78 -1330.91 3987.45 199.50 5.53 BP _MWD+IFR+MS 161 8199.84 88.03 168.17 32.30 4258.79 3432.19 -3790.39 -1324.44 4015.12 199.26 4.35 BP _MWD+IFR+MS 162 8232.17 88.82 168.65 32.33 4259.68 3464.51 -3822.05 -1317.95 4042.90 199.03 2.86 BP _MWD+IFR+MS 163 8263.66 89.06 168.41 31.49 4260.26 3495.99 -3852.90 -1311.69 4070.06 198.80 1.08 BP _MWD+IFR+MS 164 8293.93 88.96 168.52 30.27 4260.79 3526.25 -3882.56 -1305.64 4096.21 198.59 0.49 BP _MWD+IFR+MS 165 8326.05 89.10 167.83 32.12 4261.33 3558.37 -3913.99 -1299.06 4123.94 198.36 2.19 BP _MWD+IFR+MS 166 8357.66 89.10 168.52 31.61 4261.83 3589.98 -3944.93 -1292.58 4151.29 198.14 2.18 BP _MWD+IFR+MS 167 8388.99 88.79 167.02 31.33 4262.40 3621.30 -3975.54 -1285.95 4178.34 197.92 4.89 BP _MWD+IFR+MS 168 8421.56 88.89 164.59 32.57 4263.06 3653.84 -4007.10 -1277.96 4205.96 197.69 7.47 BP _MWD+IFR+MS 169 8453.08 89.27 164.45 31.52 4263.57 3685.29 -4037.48 -1269.55 4232.37 197.46 1.28 BP _MWD+IFR+MS 170 8484.77 90.26 164.41 31.69 4263.70 3716.92 -4068.00 -1261.04 4258.98 197.22 3.13 BP _MWD+IFR+MS • 171 8517.00 90.50 163.63 32.23 4263.48 3749.07 -4098.99 -1252.17 4285.98 196.99 2.53 BP _MWD+IFR+MS 172 8548.32 89.78 163.17 31.32 4263.41 3780.29 -4129.00 -1243.22 4312.11 196.76 2.73 BP _MWD+IFR+MS 173 8580.57 89.15 163.40 32.25 4263.71 3812.43 -4159.89 -1233.95 4339.04 196.52 2.08 BP _MWD+IFR+MS 174 8612.80 90.19 162.59 32.23 4263.90 3844.54 -4190.71 -1224.52 4365.95 196.29 4.09 BP _MWD+IFR+MS 175 8643.38 89.10 161.43 30.58 4264.08 3874.95 -4219.79 -1215.08 4391.25 196.06 5.21 BP _MWD+IFR+MS 176 8674.11 88.17 159.47 30.73 4264.82 3905.40 -4248.74 -1204.80 4416.26 195.83 7.06 BP _MWD+IFR+MS 177 8707.26 87.04 160.02 33.15 4266.20 3938.18 -4279.81 -1193.33 4443.07 195.58 3.79 BP _MWD+IFR+MS 178 8763.00 87.04 160.02 55.74 4269.08 3993.31 -4332.13 -1174.31 4488.47 195.17 0.00 Pr oject to TD [(c)2008 IDEAL ID13_OC_08] s • Schlumber er g Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC) Well No L-205L4 Date Dispatched: 7-Jul-08 Installation/Rig Nabors-9ES Dispatched By: Franklin Medina LWD Log Delivery V2.1, 03-06-06 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: ,lames H. Johnson R2C@IVed By: BP Exploration (Alaska) Inc. Petrotechnical Data CenterlLR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: ~ohnso h@h .com ~ u~- Qs"~ Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Thursday, June 12, 2008 3:09 PM To: 'Kolstad, Scott R' Subject: FW: PBU ORIN L-205, etc Scott, The names have been changed as requested for the L-205 laterals. Changing the name is not really difficult. API numbers would have been something else. will make sure copies of our messages are placed in the well files. Call or message with any questions. Tom Maunder, PE AOGCC From: Johnson, Elaine M (DOA) Sent: Thursday, June 12, 2008 3:04 PM To: Maunder, Thomas E (DOA) Cc: McIver, C (DOA) Subject: PBU ORIN L-205, etc Tom, Names have been changed in RBDMS: 50-029-23388-61-00 208-055-0 50-029-23388-62-00 208-056-0 50-029-23388-63-00 208-057-0 50-029-23388-64-00 208-058-0 Elaine Page 1 of 1 PRUDHOE BAY UN ORIN ~05L2 is n~ ~^,~ L-205L3 PRUDHOE BAY UN GRIN ;.-~05L3 is now L-205L4 ~.•r PRUDHOE BAY UN GRIN E. -205L4 is now L-205L5 PRUDHOE BAY UN ORIN L-205L1-01 is now L-205L2 6/13/2008 A' Y'V Al-GVJ 1..1-V A 1A41.1A1~+'S~11QAA~AAlAAi GVQ9-VJC-y GV(--VJJ9 GV(--VJ V9 GV~ / ~ st~~ 1 ~A G IVlaunder, Thomas E (D®A) ~®~~ ~ , _- _ ~__ .. From: Kolstad, Scott R [Scott.Kolstad@bp.com] ~~~`~~`sd.: ~~ ~~~ , ,, Sent: Thursday, June 12, 2008 11:47 AM v~C.a.a~C ~~~ ~S ~ T : Maunder Thomas E DOA ~ r Subject: FW: L-205 L1-01 name change permit 208-058, 208-055, 208-056, 208-057 ~~ Attachments: L-205 Proposed Completion revsied 6_10_08.ZIP; L-205 Old proposed schematic.ZlP ~ - ~.rL- Tom, We did discuss just changing the name of the L-205L1-01 lateral to L-205 L5. We wanted to stay with the naming convention of naming the laterals in the order in which they are drilled and that is why we proposed the changes below. I think this will make it a lot less confusing when looking back at post well data. Please let me know which convention you wish to go with. Thanks for your consideration. Scott From: Kolstad, Scott R Sent: Tuesday, June 10, 2008 4:49 PM To: 'Maunder, Thomas E (DOA)' Subject: L-205 Ll-Ol name change permit 208-058, 208-055, 208-056, 208-OS7 Tom, Due to some difficulty running past the L-205 aluminum billet liner top we would like to make some changes to the location of the L-205 L1 liner top location and exit point for the Obd lateral that was permitted as L-205 L1-01. This will intern change the well bore names from the permitted names. Well targets will remain as permitted. The L-205 L1 liner top will be run to 5,750' as depicted in the attached schematic and will cover up the L-205 billet to reduce the risk of further problems with the L-205 billet. This will change the KOP for the Obd lateral to kicking off from the L-205 well bore and not the L-205 L1. We would like to propose the following changes to the naming of the Obd lateral and subsequent laterals. Permitted Well Name _ ~~ ~ L-205 L1-01 L-205 L2 ~''~5 _ ~, L-205 L3 ~ L-205 L4 ~ °C`~ 4°1 Please contact me to discuss. «L-205 Proposed Completion revsied 6_10_08.ZIP» «L-205 Old proposed schematic.ZlP» 1 have also attached the otd (as permitted) schematic for reference. L-205 L2 L-205 L3 L-205 L4 L-205 L5 Proposed new well name Thanks, d' t/V o 1L.°GV1J fl~ d °le" d idctdLAG S;idQl)~GL LAdld G'tJ®°lBJ®y G~/L)-ldJJ9 G'~Q)°f/J4J~y G~J / 8 ~I.~G G X571 G Scott Kolstad Scott Kolstad BP Exploration (Alaska), Inc. Senior Drilling Engineer Greater Prudhoe Bay Rotary Drilling Scott.Kolstad@bp.com Office: (907)564-5347 Cell: (907)748-2598 Fax: (907)564-4040 6/12/2008 ~ ~=`~ -`^~!~ ~®Cly ~ ~ 9 °~N~ y ~e~y F ~y E35 ~`.`6' ~~~~~~F'~® ~~9!/E~~~~~~/6F1 S~ `` t1 TKEE~ FivIC v-1/'16" 5ivl ~ it WELLHEADS FNIC Gen 5 System 20" X ~4" 215.5 Ib/ft, A53 ERVV Insulated 109' "1'I". 5M cs dead w/ T' mandrel hart er 3 ~ @ y~ g paclcoff i ~ ~I~I" x 1'I". 61V1, tby spool w/ Walliburton X-Nipple (3.813" ID) @ 2200' TVD 11" x v-112" tubing hanyer with conirol line pons I'I" X 4-1/16" Adaptor Flanye i 4-1/2'~, 12.61b/k, L-80, BTC-M ~t - Coupljng OD: 5.2" Orig KB elev (N-9ES) _' ~ Drift/lt~ : 3.833"13.958" 10-314". 45.5i~ L-80 BTC Csg @ 3,017 MD 1 1 +~ 4.5" Baker slidin' sleeve wdh 3.813" ID @ r •~'- ~ GLM Design' ~` ~, ~~ - - 7-5/8' X 5-1/2" Biker PRM Packer @ 4482' #4 -TBD' TVD - 4-1 /2" X 1" KBG-2 - SV ® , - I #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV ' Hallibunon x-NiRples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-112" X 1" KBG-2 - DV 3Ib NP G - 4.5° WLEG @4,,550' MD #1 - 2 jts above sliding sleeve - 4-112" X 1" KBG-2 - DV '•~ressu ~ ~ ~, 3auge Versapra Sfh10BM in each Lateral and in mother bore from tbg tail down. •rvdh I-Wire ! ~ ` Surface ~ RA faq ~- -i ti-314" fVb Lateral 4 590'- 8,6$1' L,~~O~~~ 1+\ c' G~ a ' m J m ~~tY~ ~° ~ Swell packer placement TBD 6-314" OA Lateral -~ ~;~ `~~ - Junc4ion $ogoiFications: b 4,800' - 8,757` e~' ~~ ~' Junction ID through LEM s`+ ~ RATac}, ~~ /+ 1,~~~--~~ ~ Module without diverter. 3.68" RAT TBD ~ y ui G G ~ L-~oS'L3 ~ LEM run with internal sealbores ti °•..~~®~~ J ~ _ ~( ~~ ~ "- .. L to allow the use of isolation ~ ~.~J ~ " ~ ~`~ sleeve across window. ^`y '~ Swell packer placement TBD -- Solid Lut. - Bb L renal Baker Hughes Hookwall Hanger F2t~Tag TBD ~`, s. ~ ~ ,.`~~--~~ ' -- -- Window in 7-5/8" casing ~ `~ ~y y~ ~ '" -~ Well Inclination @ Window =' ~ _ ~ ~,. "~. ~I 6-~4" OBa Lateral 4,933'-8,86%' ~ / ~' ,--- ^'-'"' J to Baker Hughes Hookwall Hanger q'~ ~ L,Z6s~~ / / do i_a I I <~ ~~ VVndow in 7-5/8" casmy ~.V ~ RA Tag` / s¢IiO ~b .rt3a o 9I,~ _i ii!'~ ,~+° Well Inclination @ W indow = r, ~ {gyp{~, ~_ ' ~. / /trine/` ~t". ~ ., r F•~°~ Baker Hughes Hookwall Hanger ~ ~ ~ ~ Window in 7-5/8" casing ~ ~',,\' ~ bwel. acker placement TBD '~U'y, °°~ Hiule. r Well Inclination @ Window i /' ---r.- r,°.~ ;r-~. lag. ,¢~~~ B ~ ~~~ P~ ~ -, -.- --- ---.--__ ___. RAT TBD - . ,, - ;~ 7-5/8", 29.7#, L-80, Bl C-IVI @ 5416' "+~- ~_, Casing Drift 6.75 ~~~-,-,~~- ,:~ 6-3/4" UBd Laierai jS Ut)tF` - u 9/ a- ~ ~r' ~~ Casing ID: 6.875" ~~..~,y N____,~" - -- _- UAT t- Y•~REV E3Y -_,•' COMMENT"5 ~~~~~ -4 ~`p g~~.~qj' 3/2712008 SRK Level 3 fuiulti-Lateral, 4-112" GL Completion - WELL: L-205 EVIL API id0: 50-U29- APi WO: 50-029- --- 50-029- 50-029- 50-029- 50-029- . s -z~-~v~ ~ Ot'~~!'- a~ f-t-~'~ v'c'c1~s v'' i~ mss-c~s'r® ~i TFtLc: Ft/1C 4-'!1'16" 5+Y1 ~ U+lELt_HEflU: Fr:A% Gan 5 System p 2fi" X ::4" 218.5 !blfit, Li53 ErBYJ Insuldlad ~ iG0' 7'I", 5M cse~.head 'Nl %' mandrel hangar & packoff 'l7" a Ti ". fitYl, [bq spw! w/ Halliburton X Nipple (3 813 ID) @ 2200' TVD 11 x d-912 iut:tng nanyer vviCn ccret,ul Ilne ~icrts I ~- 19" ;6 41/7£:` Aclat~lor C=lang:.' 4-1/2 12 6 Ib/ft L 80, BTC-M ~ Orig KB elev (N-9ES) _' ~ ~ s (;n~+ullnc O!J 5 ~ j Lrif 'iG 3.833"/3.958" 9p-314 , 45.5# L-£~iS S°'I'C Gsty @ 6,{i97' F;IiU i ~ r' 4.5" Baker sliding sleeve with 3.813" ID @ I I---, GLM Design: 9 ~ 7-5/8" X 5-1/2" Baker PRM Packer @ 4482' #`t -TBD' TVD - 4-1/2" X 1" KBG-2 - SV ~ ~ ~ ' #3 -TBD' TVD - 4-1/2" X 1"KBG-2 - DV Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-112" X 1" KBG-2 - DV 4.5" WLEG @ 4,550' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Slb NPDG Pressure '~y Gauge ~~ ; • Versapro SFMOBM in each Lateral and in mother bore from tbg tail down. p^ ~ with I-Wire to .; i ~ f surtace I RATa9~ ~5~30'~8,~a11'" ~~E„-~-'`;~~c-Z'( ~-~ ~____ i ~,-_°9®°~ °°~=e ~ -~ ~~ L-205 L5 (Nb LATERAL) Swell packer placement TBD }} ~ . - L-205 (OBb LATER L) ~-•- - - -- Junction Specifications: _ r Junction ID through LEM g\ L st~4' - ~'.,7 L-205 L4 (OA LATERAL) +- i , • RATa 15,£'5 - 8,€77 __ Module without diverter 3.68' 1 RATag TBD ' ~-~-+.k~ ~ LEM run with internal sealbores j '-' [o allow the use of isolation ''+~ ~a~'°'~°°~ ~~' ~ '"` °""``°~^a sleeve across window. ! `y ., Swell packer placement TBD / B 91ter H!,ghe„ i,~oK+95i11 Hiyng9r RATag TBD / }s inrlu'rn In 1 E)%Y as ng ~,1 / 4~~~~\U ~ilal(ln„ilnatior+@Wlnriow~" ' 'I' I~~.~~'.~~~-L-205 L3 ~. L-205 L1(0~3c LATERf~L) ., - -- -~+ ~Eak~rHU~reeHaoiwaltHan~76r RATa O~~ / i r 1'J~tuCw Jr 7 5/8~ casing ° g;f1, ( ) ;~ '11,-1,-'1 -{~f !sue 7s '- S $ Wc';H ft9ctiriatkrr, ~i'sti'itik~.'+ti - I I„I ~ ® ~I{tl ~ ® 0 .. + .. ~~~~Y~•_ 8zrkar Hughes linokwat) Hall~9er ~ / ` a ~ ~~~ ~, r iV~J:nr'ca in =5!" ce>;ing I Swell packer placement TBD .blurt • < < <~ RA Tao I.~agph+Cllntstlor+(r~'Nirldot^r ~ RA Tag TBD ^ ~i9+~t ~_ << i ,~ ~ ~ ~~ z~~~ ~ ~~ -- - m-- - ° a°_ _ +~ ~ ~~ _ ~ -5/b'', 7.9,7#1, L-130, STC-s'JI @ 5-016' F ! r-- Gs~ing ur4Pt' 6.%5"' RATag RATag j_5,"vCfD'- 8,07¢J~ j Cs~irvq ID: E,Ff75" as~r~ } t-.~v,~r coMMeMre Gii~lOt>e ~ L-205 L2 (OC~3d LATERAL) --- ~if~j~ y~,,;~~f'~l',~rt`Ifr~r'h~,~f~ 4N 612006 SRK LroeFl 3 YJ1Uli1-Lairrni, d-112" QL Camplottan _ 4'~ELL: L-"L335 ftiSL CoPI Pi6?: 8tJ-626- A:PI fda'i; 117-G^.9- _ ¢ 9awtC24- ~n-n2~- i9d19~D~ eu-rreo- ~a r ~ L.- ~( ~ I g.~:^1' .; ~ ~~3 ).J ~ a E..t " ~, t .1 )f ik k i 4 V (fit V ttty ~.1 AI.ASgiA OII, AIQD GA,S CO1~T5ERQATIOI~IT C011'II~II55IO1~T Robert Tirpack Engineering Team Leader BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Re: Prudhoe Bay Field, Orion Oil Pool, PBU L-205L3 BP Exploration Alaska, Inc. Permit No: 208-056 Surface Location: 2361' FSL, 3786' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 1938' FNL, 4958' FEL, SEC. 03, T11N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well PBU L-205, Permit No 208- 053, API 50-029-23388-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ ~ day of April, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA • ~ ~ ~ ~ ALAS~tL AND GAS CONSERVATION COMMI~DN APR 0 3 2008 ~, PERMIT TO DRILL 20 AAC 25.005 Alaska Oil & Gas Cons. COmmission 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class O Exploratory O Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1c. Specify if well is pro ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: L-205L3 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 8757' • TVD 4262' . 12. Field !Pool(s): Prudhoe Bay Field !Orion 4a. Location of Well (Governmental Section): Surface: 2361' FSL 3786' FEL SEC 34 T12N R11 E UM ` 7. Property Designation: it.DL ADL 028241 OZ~L Schrader Bluff , , . , , , Top of Productive Horizon: 1888' FSL, 325' FEL, SEC. 33, T12N, R11 E, UM 8. Land Use Permit: • $, 13. Approximate Spud Date: April 15, 2008 Total Depth: 1938' FNL, 4958' FEL, SEC. 03, T11N, R11E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 4970' 4b. Location of Well (State Base Plane Coordinates): Surface: x-583130 y-5978082 • Zone-ASP4 10. KB Elevation Plan (Height above GL): 76.7 , feet 15. Distance to Nearest Well Within Pool: 200' ~ ~~~ ~ 16. Deviated Wells: Kickoff Depth: 4825 feet Maximum Hole An le: 109 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1910 Surface: 1470 ' 1'8. Casin Pro iam: S cficatio ns - To = Settin `l )e th -Bo ttom uantit of Cement c.f. or sa s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 3957' 4800' 4182' 8757' 4262' Uncemented Slotted Liner 19. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 8977' Total Depth TVD (ft): 4362' Plugs (measured): None Effective Depth MD (ft): 8977' Effective Depth TVD (ft): 4362' Junk (measured): None Casing Length ize Cement Volume MD TVD Conductor /Structural 153' 20" Driven 153' 153' Surface 3017' 10-3/4" 663 sx Dee Crete 441 sx Class'G' 3017' 2742' Intermediate 5416' 7-5/8" 359 sx Class'G' 5416' 4412' Prod i n Liner 3377' 4-1 /2" Uncemented Slotted Liner L-205 5600' - 8977' 4421' - 4362' Liner 3068' 4-1/2" Uncemented Slotted Liner L-205L1 5905' - 8973' 4412' - 4422' Liner 3979' 4-1/2" Uncemented Slotted Liner L-205L1-01 5000' - 8 79' 4283' - 4487' Liner 3934' 4-1/2" Uncemented Slotted Liner L-205L2 4933' - 8867' 4252' - 4322' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number: Si nature ~ ~ Phone 564-4166 Date %~~ ~ Terrie Hubble, 564-4628 Commission Use Onl Permit To Dr.i~~ll~,~pp Number: ~~O ' API Number: Gi Q S0- d Z/' 233$gj' ~ Permit A pr va Date: See cover letter for other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me~tha~ne, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes L~No Mud Log Req'd: ^ Yes [~No '~~ HZS Measures: Q'4es ^ No Directional Survey Req'd: ['Yes ^ No Other: 3 ~O~ Q S° ~ ~,a'"~•}~-'`~.°~'~ APPROVED BY THE COMMISSION // Date ,COMMISSIONER Form 10-401 Revised 12/2005 ~ ~ ~ ~ ~ ` ~ ~ ~ % Su~ n. ~p~~e t , ~1~ C ~~ • Well Name: L-205, L-205L1, L-205L1-01, L-205L2, L-205L3, & L-205L4 Drill and Complete Plan Summary Type of Well (producer or injector): Schrader Bluff Nb, OA, OBa, OBb, OBc, and OBd Multi-Lat '~ Target X Y Z Township Range Section FSL FEL TVDss Surface 583130.4 5978082.2 12N 11E 34 2361 3786 L-205 OBb Target 581240 5977030 -4330' 12N 11E 33 1330 411 Start: L-205 OBb Target 582015 5973570 -4285' 11N 11E 3 3141 4960 End: L-205L1 OBc Target 581280 5976780 -4335' 12N 11E 33 1080 374 Start: L-205L1 OBc Target 582020 5973570 -4345' 11N 11E 3 3141 4955 End: L-205L1-01OBd 581320 5976600 -4335' 12N 11E 33 899 336 Tar et Start: L-205L1-01 OBd 582015 5973560 -4410' 11N 11E 3 3131 4960 Tar et End: L-205L2 OBa Target 581289 5977479 -4175' 12N 11E 33 1779. 356 start: L-205L2 OBa Target 582015 5973670 -4245' 11N 11E 3 3241 4959 End: L-205L3 OA Target 581318 5977589 -4105' 12N 11E 33 1888 325 Start: L-205L3 OA Target 582015 5973770 -4185' i1N 11E 3 3341 4957 End: L-205L4 Nb Target 581377 5977743 -3975' 12N 11E 33 2042 264 Start: L-205L4 Nb Target 581960 5973870 -4035' 11N 11E 3 3441 2569 End: AFE Number: TBD Ri Nabors 9ES GL: 48.2 RT: 28.5 RTE: 76.7 . Estimated Start Date: April 15, 2008 O eratin da s to com lete: 72 Well Information Distance to Nearest Property: 4970 feet to PBU boundary. Distance to Nearest Well in Pool: 200 feet to L-121A well bore near toe of well at the top Nb level (4500' SS). Well Type: Schrader N and O-sand Sexa-lateral Producer Current Status: New well Conductor: 20", 129 ppf, X-56, ERW set at 152.5' KB BHT: 75 Degrees F at -3950' SS 83 Degrees F at -4300' SS BHP: 8.5 - 8.7 EMW ppg in the Ugnu and Schrader sands L-205 Permit to Drill 3/25/2008 SDE: S. Kolstad PE: T. West GEO: G. Bernaski Formation To s TVDss and Estimated Pore Pressures Est. Formation To s Uncertaint Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation TVDss feet Yes/No Psi (pP9 EMW NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation to s are re uired from surface to TD for all new wells G1 -250 +/-50' No 113 8.7 SV6 -890 +/-50' No 401 $.7 SV5 -1545 +/-50' No 695 8.7 SV4 -1675 +/-50' No 754 8.7 Base Permafrost -1675 +/-50' No 754 8.7 SV3 -2020 +/-50' Gas H drates 909 8.7 SV2 -2180 +/-50' Gas H drates 981 8.7 SV1 -2470 +/-50' Gas H drates 1112 8.7 UG4 -2750 +/-50' Thin coal 1238 8.7 UG4A -2780 +/-50' Heavy Oil between -2780 and -2880' SS 1251 8.7 UG3 -3095 +/-50' Thin coals 1393 8.7 Fault #1 L Pad Fault -3365 +/- 150' M.D. UG1 -3535 +/-50' Heavy Oil from - 3625' to -3735' ss 1591 8.7 Fault #2 -3745 +/- 100' M.D. UG_Ma -3745 +/-50' Yes 1685 8.7 UG_Mbl -3790 +/-50' Yes 1706 8.7 UG_Mb2 -3845 +/-50' Yes 1730 8.7 UG_Mc -3910 +/-50' Yes 1760 8.7 SB_Na -3960 +/-25' Yes 1762 8.6 SB_Nb -3980 +/-25' Yes 1771 8.6 SB_Nc -4005 +/-25' Yes 1782 8.6 SB_Ne -4015 +/-25' Yes 1787 8.6 SB_OA -4115 +/-25' Yes 1815 8.5 SB_OBa -4175 +/-25' Yes 1841 8.5 SB_OBb -4215 +/-25' Yes 1859 8.5 SB_OBC -4265 +/-25' Yes 1881 8.5 SB_OBd -4310 +/-25' Yes 1901 8.5 SB_OBe not reached +/-25' Yes Well TD Criteria TD for all laterals will be at end of polygon. No extensions beyond the end of the polygons are planned. (ie ??ft TVD, ??ft Rathole, etc.) Comments Formation pressures in the O and N sands and are extrapolated from L-106 and L-116 RFT formation pressures. Ugnu M sands and shallower pressure data is extrapolated from regional Schrader Bluff MDT pressure trends at a .45 psi/ft pressure gradient. L-205 Permit to Drill 3/25/2008 Mud Program: 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densit Funnel vis YP PH FL Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0 8 ~/~" Corin fluid Mud Pro erties: LVT-200 MOBM Versa-Core) Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 10.4 -10.5 >2000 99:1 15-19 <20 4-5.5 < 6 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densi Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.3 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logginq Program: 13-1/2" Hole Section: Surface G ro ma be needed O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station O en hole LWD: GR/Res/Neu/Azimuthal Den /Densi Cali er PWD O en hole wireline: Drill i e conve ed MDT Cased Hole: USIT 6-3/4" Produciton Holes: Surreys will be IIFR corrected real time and multi-station O en hole: MWD / GR /Res /Azimuthal Den /Neu /AIM /PWD Cased Hole: N/A Casing/Tubing Program Lateral Hole Size/ Csg / WbFt Grade Conn Burst Collapse Length Top Bottom Name formation Tbg (psi) (psi) MD / MD /TVD O.D. TVD driven 20" 129# X-56 Weld GL 152.5' /152.5' 13-~/z" 10-3/a" 45.5# L-80 BTC 3,580 2,090 3017' GL 3017' / 2742' 9-%e" 7-b/8" 29.7# L-80 BTC-M 6,890 4,790 5416' GL 5416' / / TC-I I 4411.7' L-205 6-3/a" OBb 4-~/2" 12.6# L-80 IBT N/A N/A 3377' 5600' / 8977' / slotted 4421' 4362' L-205 6-3/a" OBc 4-'h" 12.6# L-80 IBT N/A N/A 3068' 5905' / 8973' / Li slotted 4412' 4422' L-205 6-3/a" OBd 4-'/2" 12.6# L-80 IBT N/A N/A 3979' 5000' / 8979' 1 Li -01 slotted 4283' 4487' L-205 6-3/a" OBa 4-~/2" 12.6# L-80 IBT N/A N/A 3934' 4933' 1 8867' / L2 slotted 4252' 4322' L-205 6-3/a" OA 4-~" 12.6# L-SO IBT NIA N/A 3957' 4800' / 8757' J L3 slotted 4182' 4262' L-205 6-3/a" Nb 4-~/2" 12.6# L-80 IBT N/A N/A 4051' 4590' / 8641' / L4 slotted 4052' 4107' Tubing 4-~/z" 12.6# 13Cr- Vam 8,430 7,500 4560' GL 4560'/ 80 To 4032' '~- L-205 Permit to Drill 3/25/2008 Surface and Anti-Collision Issues Surface Shut-in Wells: L-121 and L-110 will require surface shut-in and well house removal in order to move over well L-205. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: All wells pass the major risk close approach scan. Close Annroach Well List: Lateral Close Ctr-Ctr Reference Allowable Mitigation. Approach Distance MD Deviation Well Name L-205 L-04 77.7' 563' 67.9' Use Traveling C tinder L-205 L-109 62.0' 583.3 50.4' Use Traveling C tinder L-205 L-114A 55.4' 921.1' 41.2' Use Traveling C tinder L-205 L-116 46.1' 489.5' 38.5' Use Traveling C tinder L-205 L-121 16.2' 290' 10.9' Use Traveling C tinder L-205 L-50 31.2' 979.4' 16.1' Use Traveling C tinder L-205 L-51 67.15' 1120' 46.3' Use Traveling C tinder Cement Calculations Casin Size: 10-3/a -in 45.5-Ib/ft L-80 BTC surface casin Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: Surface Tail: 1,000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2,017' MD 1,000' MD above shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer wei hted to 10.10 pp (Mud Push) Lead 439 bbls, 2465 cuft, 663 sks 10.7 Ib/ al Dee Crete - 3.72 cuft/sk Tail 92 bbls, 516 cult, 441 sks 15.8 Ib/gal Class G + adds -1.17 cufUsk Dura stone in last 15 bbls Temp BHST ~55° F, BHCT ~60° F estimated by Schlumberger In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: ~ 7-5/8", 29.7-Ib/ft L Basis: Lead: None Lead TOC: N/A Tail: 1416' of open hole with 30% excess, plus 80' shoe track Tail TOC: 4000' MD 597' MD above the Ma, -1000' MD below Surface Shoe Total Cement Volume: Wash 20 bbls CW100 S acer 50 bbls of Viscosified S acer Mud ush Wei hted to 10.3 Tail 74.1 bbls, 416 cuft, 359 sks 15.8 Ib/ al G + Gasblok -1.16 cuft/sk Temp BHST 83 Degrees F at -4300' SS from SOR 4 L-205 Permit to Drill 3/25/2008 Centralizer Recommendations 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7-s/8" Casing Space Out a) Spaceout the 7-%" casing to place a full joint in the window area of the OBa, OA, and Nb sands. b) Place one RA tag (3 pips) in the 7-5/8" casing 50-100' below each window (3 total: below Nb, OBa, OA lateral windows). 5 L-205 Permit to Drill 3/25/2008 Well Control C~ Surface hole will be drilled with diverter. The intermediate hole well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOP equipment will be tested to 3000 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: • Integrity Test - 6-3/4" hole: • Kick Tolerance: • Planned completion fluid: 1,910 psi -Schrader OBd (8.5 ppg C~ 4,310' TVDss) 1,470 psi -Based on a full column of gas ~ 0.10 psi/ft 3,000 psi/250 psi Rams 2,500 psi/250 psi Annular 3,000 psi LOT 100 bbls with a 12.5 ppg EMW LOT , 8.6 ppg OBd 1,910 psi -Schrader OBd (8.5 ppg C~? 4,310' TVDss) 1,470 psi -Based on a full column of gas C~ 0.10 psi/ft si/250 psi Rams `~~ K ~~ 2,500 psi/250 psi Annular 3,000 psi Q~'~~-Q~-~~, FIT to 11.5ppg EMW for OBb lateral only Infinite at OBb, OBc, OBd, OBa, OA, and Nb with an 11.5 ppg EMW FIT 9.3 ppg SF OBM in Laterals, 9.3 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Varience Request: • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. While the flow paddle is removed from the flow line, PVT alarms will be used and the pit levels accurately monitored for any pit gain. Also, a visual check will be made during connections by looking down the riser to ensure the well is not flowing. After returned debris that could plug the flow line diminishes the flow paddle will be reinstalled. 6 L-205 Permit to Drill 3/25/2008 • Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.5-8.6 ppg EMW. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L-pad from the SV5 thru the SVi sands below the base of the permafrost. Setting casing through the SV1 should keep hydrate exposure from extending past the surface hole. Recommended practices for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation/Breathing A. Lost circulation or well bore breathing are not expected in this well. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Tastin Summa .Table Casing set / Interval Maximum Influx Volume Mud Weight. Exp Pore Press LOT /FIT Surface / 9 7/8" 100 9.3 8.5 (OBd) Assuming 12.5 LOT Intermediate / 6-3/4" Infinite 9.3 8.5 (OBc) 11.5 (FIT for OBb lateral onl An FIT will onl be erformed for the OBb lateral, not the OBc, OBd, OBa, OA, or Nb. V. Hydrogen Sulfide L Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. No measurable H2S is being produced from the formation at this time. However 5 - 50 ppm is expected as a result of the use of Ivishak gas lift gas. All L Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflnnd maturac_ RP.CP.rlt H„S rtata frnm tha Hart is ac fnllnwc• ell Name H2S Level Date of Readin #1 Closest SHL Well H2S djacent well to the Level L-110 70 m 10/11 /2007 ast of L-205 SHL #2 Closest SHL Well H2S djacent well to the Level L-121A 15 m /28/2007 est of L-205 SHL #1 Closest BHL Well H2S Kuparuk producer Level L-114A 0 m 8/14/2007 near heel of laterals #2 Closest BHL Well H2S Kuparuk producer Level L-121 A 15 m 8/28/2007 near toe of laterals Max. Recorded H2S on Pad/Facilit L-120 50 m 10/20/2006 VI. Faults A. Two faults are expected to be crossed in L-205. No losses are expected to be associated with these faults. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may be encountered. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - L Pad Fault 3824 -3365 -50'-80' West +/-150' M.D. Fault #2 - Ugnu M Sand Interval 4277 -3745 -40'-70' West +/- 100' M.D. CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 7 L-205 Permit to Drill 3/25/2008 L-205, L-205 L1, L-205 L1-01, L-205 L2, L•2,, t~; & L-205 L4 DRILL AND COMPLETE PROCEDURE SUMMARY 1. A 0" non-insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 Ilhead on the conductor. 2. If nec ssary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and produc n simops. rillin Ri O rations: 1. MIRU Nabors ES. Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'/z" drilling ssembly with MWD/GR and directionally drill surface hole to approximately 80' TVDss above the Top of th UG4A (±3017' MD). 3. Run and cement the -3/a", 45.5#, L-80 BTC surface casing back to surface. Test the 10-3/a" casing to 3,000 psi for 30 minutes at pl bump. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to 3,000 psi. • L-205 PB1 4. MU 9-%8" directional drilling a sembly with a bent housing motor. Drill out the float equipment and 20' of new formation. Displace the well t ew 9.3 ppg Versa Pro LS MOBM drilling fluid. Perform a LOT. POOH. 5. MU 8'/z" directional drilling asse bly with Schlumberger Power Drive RSS, Gamma at bit, MWD/ARC GR/Res/Den/Neu/PW D and a Gh t reamer 11,000' from the bit. 6. Directionally drill ahead to 50' abov rojected core point. Displace the well bore to the Versa Core coring fluid. Drill to core point which is prognosed t -3940' TVDss. 7. Core 480' starting in the mid Mc throug the base Schrader Bluff OBd. 8. Drill t 200' of logging rat hole. 9. Log the open hole interval using wireline-co veyed Schlumberger Platform Express GR/Res/Neu/Den and Dipole Sonic 10. MU plug back BHA. RIH and spot a series of c m shoe. 11. POOH. • L-205 OBb Lateral 12. PU 4" DP as needed. MU 9 7/8" directional drilling reamer 11,000' from the bit. 13. Drill out cement to the surface casing shoe. 14. Displace the well bore to 8.8 ppg LSND mud. 15. Drill to TD at 20' TVD below the top of the OBd. 16. RU and run drill pipe conveyed MDT logs. plugs to fill the OH from TD to inside the surface casing with MWD/GR/Res/Den/Neu/PWD and a Ghost 17. Make a clean out run to TD. 18. MU and run 7 S/8", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement i one stage to 4,000' MD (11000' MD from the surface casing shoe). Bump plug with seawater. Test the 7 5 "casing to 3,000 psi for 30 minutes. 19. Clean pits for displacement. Freeze protect 7 s/e" x 10-3/a" annulus to 2,2 'TVD. 20. PU 6-3/d' conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD a RIH to the float collar. 21. Displace well over to 9.3 ppg Versapro LS MOBM. Drill out shoe track, circu to and condition mud. Drill 20' of new formation and perform FIT to 11.5 ppg EMW. 22. Directionally drill ahead to TD geo-steering through the OBb to TD. Back ream o t of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 23. POOH to near OBa window depth, log the OBa RA marker with GR, log across the and Nb windows also. POOH. 24. MU and run 4-~h" 12.6# L-80 BTC-M slotted liner with swell packers and Aluminum bille finer top. Position billet in a tangent section at 15,600'. POOH. 8 L-205 Permit to Drill 3/25/2008 .•. C 25. RIH 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well over to 9. g Versapro LS MOBM. Trench for sidetrack and time drill off billet to sidetrack. 26. Directionally dr o the planned TD in the OBc. Back ream out of hole to shoe, circulate and condition mud. RIH to TD and disp a well bore to 9.3 ppg Versapro SF MOBM. POOH. 27. MU and run 4-'/z" 12.6# BTC-M slotted liner with swell packers and Aluminum billet liner top. Position billet in a tangent section at t 05'. POOH. • L-205L1-01 OBd Lateral 28. RIH with 6-3/a" sidetracking /drilling asse ly with MWD/GR/Res/Den/Neu/AIM/PWD to AI billet. Displace well over to 9.3 ppg Versapro LS MOBM. Trenc r sidetrack and time drill off billet to sidetrack. 29. Directionally drill ahead to TD geo-steering throng a OBd to TD. Back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace bore to SF MOBM. 30. MU and run 4-'/z" 12.6# L-80 BTC-M slotted liner with liner er and liner top packer. Position TOL for OBa whipstock. POOH. •3 L-205L2, OBa Lateral 31. PU the 7 5/8" whipstock assembly. Set the whipstock on the OBd liner top p er such that the top of the window is near the top of the OBa sand. Orient and set whipstock. Shear off 'stock. Displace well over to 9.3 ppg Versapro LS MOBM. Mill window. POOH. 32. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to w 'stock. Directionally drill to the planned TD of OBa lateral. Back ream out of hole to KOP, circulate a ondition mud. RIH to TD and displace well bore to SF MOBM. POOH. 33. Pull whipstock #1. Run and set 4-~/z" slotted liner and hook hanger. POOH and LD liner running string. Baker Lateral Entry Module #1 with ZXP liner top packer, POOH. • L-205L3, OA Lateral ; ~~ ~ ~~~-,~,`'~ 34. PU the 7 5/8" whipstock assembly. Sett a whipstock on the OBa liner top packer such that the top of the window is near the top of the OA sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.3 ppg Versapro MOBM. Mill window. POOH. 35. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OA lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 36. Pull whipstock #2. Run and set 4-~/z" slotted liner and hook hanger. POOH and LD liner running string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. POOH. '• L-205L4, Nb Lateral 37. the 7 5/e" whipstock assembly. Set the whipstock on the OA liner top packer such that the top of the window is ne he top of the Nb sand. Orient and set whipstock. Shear off of Whipstock. Displace well over to 9.3 ppg Vers o MOBM. Mill window. POOH. 38. RIH with 6-3/a" ventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to planned TD of the Nb lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and di ace well bore to SF MOBM. POOH. 39. Pull whipstock #3. Run 4-~/z tted liner and hook hanger. POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Modu 3 with ZXP liner top packer. Clean pits for displacement. Displace mother bore over to 9.3 ppg KCL brine. PO 40. MU 4-~h" 12.6# Vam Top, 13Cr-80 comple ' assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 41. Drop RHC ball and rod and set packer as per Baker ommendation and test tubing to 3,000 psi and annulus to 3,000 psi. Shear DCK valve. 42. Install two-way check and test to 1,000 psi from below. Nipp own the BOPE. Nipple up and test the double master valves to 5,000 psi. 43. Pull two-way check. Reverse in brine with corrosion inhibitor to protect annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 s/8".casing annulus valves. 44. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 9 L-205 Permit to Drill 3/25/2008 L-205, L1, L1-01, L2, L3, & L4 PROPOSED COMPLETION ~ 20" X 34" 215.51b/ft, A53 ERW Insulated @ 109' \ Halliburton X-Nipple (3.813" ID) @ 2200' TVD 4-1/2", 12.6 Ib/ft, L-80, BTC-M Coupling OD: 5.2" DrifUID : 3.833"!3.958" 10-3/4", 45.5# L-80 BTC Csg @ 3,017' MD TREE: FMC 4-1/16" SM WELLHEAD: FMC Gen 5 System 11", SM csg.head w/ 7" mandrel hanger & packoff 11" x 11 ", 5M, tbg spool w/ 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" Adaptor Flange Orig KB elev (N-9ES) _' 4.5" Baker sliding sleeve with 3.813" ID @ GLM Design: 7-5/8" X 5-1/2" Baker PRM Packer @ 4482' #4 -TBD' TVD - 4-1/2" X 1" KBG-2 - SV #3 -TBD' TVD - 4-1 /2" X 1" KBG-2 - DV Halliburton X-Nipples (3.813" ID) #2 - 4 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV 4.5" WLEG @ 4 550' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Slb NPDG , Pressure Gauge with I-Wire to Versapro SFMOBM in each Lateral and in mother bore from tbg tail down. ' surface \ RATag~ 6-3/4" Nb Lateral 4,590'- 8,641' L ~rco~~~ Swell packer placement TBD Junction Sttecifications: Junction ID through LEM Module without diverter: 3.68" RA LEM run with internal sealbores to allow the use of isolation sleeve across window. 6-3/4" OA Lateral RATag~ 4,800' - 8,757` TBD \ ~ Swell packer placement TBD Solid Liw Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window = ° Baker Hughes Hookwall Hanger Wndow in 7-518" casing Well Inclination @ Window= Baker Hughes Hookwall Hanger Window in 7-5/8" casing Wefl Inclination @ Window RA RATag TBD 29.7#, L-80, BTC-M @ 5416'_ Casing Drift: 6.75" Casing ID: 6.875" 6-3/4" OBa Lateral 4,933'-8,867' \ RATag~ L.~i~~~ Swell packer placement TBD DATE REV. BY COMMENTS ORION Field ~ ~ ~ ~f ~ ) 3I27I2008 SRK Level 3Multi-Lateral, 4-t@° GL Completion , fP~ ~ ~r a~ WELL: L-205 ML API NO: 50-029- API NO: 50-029- 50-029- 50-029- 50-029- 50-029- Alum. Billet„' • .°I . - 8,977' ~-~ ~ 0.7 J. , )Bc Lateral 5,905'- 8,972' If! -~dSL~ ~~ J ~.~ r ~7 RATa~j t' ~d~L (-0 181.._. _-t~l° ~ _ _; ,,.., 6-3/4" OBd Lateral 5,000'- 8,979' I PLANT - N~~15'00'00" GRID L-PAD ~ N-L (NWE-1) L-1111 ^ ^ N-A (NWE-2) i L-51 ^ ^ L-2181 L-114 ^ ^ L-124 L-50 ^ ^ L-1121 ^ L-02 L-121 ^ L-123i L-205 ~- ^ L-122 L-110 ^ L-2111 L-2201 ^ ^ L-1151 L-116 ^ ~ L-117 L-109 ^ ^ L-118 L-04i ^ ^ L-250 L-01 ^ ^ L-200 L-107 ^ ^ L-202 L-03 ^ ^ L-2121 L-2211 ^ ^ L-2171 L-2131 ^ ^ L-203 L-1081 ^ ^ L-2161 L-1051 ^ ^ L-1031 L-106 ^ ^ L-215i L-204 ^ ^ L-201 L-104 ^ ^ L-119( L-2141 ^ ^ L-210i L-102 ^ ^ L-120 ^ L-2191 J,i 34 351 L-PAD 'lN' ~ I T12N 1 - - - -I -- T11 N ~ 3 ~ 2 VICINITY MAP N.T.S. ~~ q~q b ~Po ~,a, `~o Richard F. Allison 10608 ,~'g ~,q~~~,~~=~ o "TtSSIgJ~-`~ SURVEYORS CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MARCH 27, 2008. GRAPHIC SCALE 0 75 150 300 ( IN FEET ) 1 inch = 150 it ~~ ~~ ~- AS-BUILT CONDUCTOR 1. DATE OF SURVEY: MARCH 27, 2008. ^ EXISTING CONDUCTOR 2. REFERENCE FIELD BOOK: W008-02 PAGES 70-71. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. HORIZONTAL AND VERTICAL CONTROL IS BASED ON L PAD OPERATOR MONUMENTATION. 5. ELEVATIONS ARE BPX M.S.L. DATUM 6. MEAN PAD SCALE FACTOR IS 0.999907827. i nenrFn unTUw canTnnc,Fn RFC. 34 T 19 N_. R. 11 E__ UMIAT MERIDIAN. ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS - Y= 5,978,082.32 N. 9820.11. 70'21'00.329" 70.3500914' 47 6' 2,361' FSL ' L-205 X= 583,130.47 E. 5090.16 149'19'30.284" 149.3250789' FEL 3,786 N'. Robert °^^^^• rFe CHECKED:JC,S hn DATE: wC 3/28/08 DRAVANG: WOA L-PAD FRB08 WOL 02-00 SHEET: yy~~ JOB N0: ~ IIJ~~OO Qo sGA~E: CONDUCTOR. AS-BUILT 0 28 0 ISSUED FaR INFaRMAT10N TFB Jcs 'µ°'M~~' WELL L-205 1 °~ 1 1'= 150' un n~TC RFN1CInN 9V CHK N~aM.wE. xwvu oama by o~ ~3 Schlumberger L-205Ad (P5) Proposal Report Date: December 11, 2007 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 170.000° Field: Structure 1 Slot: Prudhoe Bay Unit - WOA L-PAD / S-G ~~ Vertical Section Origin: ~ ND Reference Datum: N 0.000 ft, E 0.000 ft Rotary Table Well: Plan L-205 (S-G) ~'~~ TVD Reference Elevation: 76.70 ft relative to MSL Borehole: ~~~ Plan L-205L4 OA ~~~ Sea Bed 1 Ground Level Elevation: 48.20 ft relative to MSL UWIIAPI#: 50029 Magnetic Declination: 22.896° Survey Name 1 Date: L-205L4 (P5)10/100 /December 11, 2007 Total Field Strength: 57651.489 nT Tort 1 AHD 1 DDI 1 ERD ratio: 195.469° / 6013.35 ft / 6.380 / 1.402 Magnetic Dip: 80.885° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: June 15, 2008 Location LaULang: N 70.35009112, W 149.32507940 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5978082.200 ftUS, E 583130.400 ftUS North Reference: True North Grid Convergence Angle: 10.63561986° Total Corr Mag North •> True North: +22.896° Grid Scale Factor: 0.99990785 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sutraea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft (ft) (de de 1100 ft Index ftUS ftUS lopvvnips[ocK 4/yy./tl J~./"1 ~`Jl.`Jl 4"IUb.UV 4ltfl./V 15V."IU -4/L .y/ -"Ii5"I/.y5 LL.VUL 4./5 5.J/ Sy//b25y.14 biSlSl/.`J25 N /U .3425/`J2541 VV 14y. 3Jytt:iti:i:i 4800.00 55.74 197.89 4105.12 4181 .82 150.26 -473 .14 -1818.01 21.99E 16.00 5.37 5977588. 96 581317.92 N 70 .34879793 W 149. 33983678 Base Whipstock 4812.78 57.64 196.99 4112.14 4188 .84 159.74 -483 .33 -1821.21 --- 16.00 5.38 5977578. 74 581314.84 N 70 .34877010 W 149. 33986274 KOP Crv 10/100 4824.78 57.64 196.99 4118.56 4195 .26 168.77 -493 .03 -1824.17 21.64E 0.00 5.38 5977569. 02 581311.98 N 70 .34874361 W 149. 33988676 4850.00 59.99 195.91 4131.62 4208 .32 188.09 -513 .72 -1830.28 21.08E 10.00 5.40 5977548. 26 581306.11 N 70 .34868708 W 149. 33993629 4900.00 64.67 193.93 4154.84 4231 .54 228.24 -556 .50 -1841.66 20.16E 10.00 5.43 5977505. 36 581295.20 N 70 .34857020 W 149. 34002859 4950.00 69.38 192.09 4174.35 4251 .05 270.61 -601 .34 -1852.00 19.44E 10.00 5.46 5977460. 41 581285.36 N 70 .34844769 W 149. 34011247 5000.00 74.10 190.36 4190.01 4266 .71 314.86 -647 .90 -1861.23 18.90E 10.00 5.49 5977413. 76 581276.65 N 70 .34832049 W 149. 34018728 5050.00 78.84 188.71 4201.71 4278 .41 360.66 -695 .82 -1869.27 18.51 L 10.00 5.52 5977365. 75 581269.14 N 70 .34818955 W 149. 34025246 5100.00 83.58 187.11 4209.35 4286 .05 407.66 -744 .75 -1876.07 18.27E 10.00 5.55 5977316. 75 581262.89 N 70 .34805588 W 149. 34030751 5150.00 88.33 185.55 4212.88 4289 .58 455.51 -794 .31 -1881.56 18.16E 10.00 5.58 5977267. 14 581257.94 N 70 .34792050 W 149. 340 Crv 10/100 5167.57 90.00 185.00 4213.13 4289 .83 472.45 -811 .80 -1883.18 22.46E 10.00 5.59 5977249. 64 581256.52 N 70 .34787272 W 149. 34036509 5200.00 93.00 183.76 4212.28 4288 .98 503.86 -844 .12 -1885.65 22.49E 10.00 5.61 5977217. 29 581254.40 N 70 .34778441 W 149. 34038512 5250.00 97.61 181.83 4207.66 4284 .36 552.39 -893 .83 -1888.08 22.67E 10.00 5.64 5977167. 56 581252.52 N 70 .34764860 W 149. 34040475 5300.00 102.22 179.86 4199.05 4275 .75 600.75 -943 .06 -1888.82 23.01 L 10.00 5.67 5977118. 33 581252.34 N 70 .34751411 W 149. 34041061 5350.00 106.82 177.82 4186.52 4263 .22 648.56 -991 .44 -1887.85 23.52E 10.00 5.70 5977069. 97 581253.84 N 70 .34738195 W 149. 34040265 End Crv 5372.72 108.90 176.86 4179.55 4256 .25 670.00 -1013 .04 -1886.85 --- 10.00 5.71 5977048. 39 581255.08 N 70 .34732293 W 149. 34039448 Crv 10/100 5474.08 108.90 176.86 4146.72 4223 .42 765.22 -1108 .80 -1881.60 161.09E 0.00 5.74 5976952. 70 581261.39 N 70 .34706134 W 149. 34035171 5500.00 106.44 175.99 4138.85 4215 .55 789.75 -1133 .44 -1880.06 161.35E 10.00 5.75 5976928. 08 581263.20 N 70 .34699402 W 149. 34033916 5550.00 101.70 174.36 4126.70 4203 .40 838.04 -1181 .75 -1875.98 161.75E 10.00 5.78 5976879. 82 581267.82 N 70 .34686204 W 149. 34030590 5600.00 96.95 172.78 4118.60 4195 .30 887.27 -1230 .76 -1870.45 162.01 L 10.00 5.80 5976830. 88 581273.89 N 70 .34672815 W 149. 34026093 L-205L4 OA Tgt 2 5641.50 93.00 171.50 4115.00 4191 .70 928.57 -1271 .71 -1864.80 159.96E 10.00 5.82 5976790. 00 581280.00 N 70 .34661628 W 149. 34021496 WeIlDesign Ver SP 2.1 Bld( doc40x_100) S-G\Plan L-205 (S-G)\Plan L-205L4 OA\L-205L4 (P5) 10/100 Generated 12/11/2007 1:21 PM Page 1 of 2 Comments Measured Inclination Azimuth Sub•Sea TVD ND Vertical NS EW Mag I Grav DLS Directional Northing Easting Latitude Longitude Depth , Section Tool Face Difficulty ft de d (ft ft ft ft ft de de 1100 ft Index ftUS ftUS AIl7/~A CA btibU.UU yZ.LU 1/1.Z1 4114.b1 4l`Jl.3l `JJ/. UU -l Gi3U.ll --ItlOJ.OG lOy.y/L iu.vu o.oo o~~o~o i.vc oo ico i.o~ iv IV AYVJJJJV YY IYJ NYVGVYJJ End Crv 5652.18 92.00 171.13 4114.53 ~ 4191. 23 939. 24 -1282.26 -1863.19 --- 10.00 5.83 5976779 .47 581281.73 N 70. 34658748 W 149 .34020187 Crv 6/100 6185.25 92.00 171.13 4095.96 4172. 66 1471. 88 -1808.64 -1781.08 127.14E 0.00 5.94 5976254 .08 581369.66 N 70. 34514949 W 149 .33953441 6200.00 91.46 170.43 4095.51 4172. 21 1486. 62 -1823.19 -1778.71 127.16E 6.00 5.95 5976239 .56 581372.19 N 70. 34510975 W 149 .33951521 L-205L4 OA Tgt 3 6240.33 90.00 168.50 4095.00 4171. 70 1526. 95 -1862.84 -1771.34 127.19E 6.00 5.96 5976200 .00 581380.00 N 70. 34500144 W 149 .33945529 6250.00 89.65 168.04 4095.03 4171. 73 1536. 61 -1872.30 -1769.37 127.19E 6.00 5.96 5976190 .56 581382.07 N 70. 34497559 W 149 .33943932 6300.00 87.84 165.65 4096.13 4172. 83 1586. 52 -1920.97 -1758.00 127.14E 6.00 5.98 5976142 .02 581393.98 N 70. 34484263 W 149 .33934690 End Crv 6337.49 86.48 163.85 4097.98 4174. 68 1623. 80 -1957.09 -1748.15 --- 6.00 5.99 5976106 .02 581404.23 N 70. 34474396 W 149 .33926690 Crv 6/100 6903.89 86.48 163.85 4132.76 4209. 46 2185. 88 -2500.12 -1590.90 57.14R 0.00 6.09 5975564 .82 581567.48 N 70. 34326055 W 149 .33798979 6950.00 87.98 166.18 4134.98 4211. 68 2231. 76 -2544.60 -1578.99 57.03R 6.00 6.10 5975520 .48 581579.88 N 70. 34313904 W 149 .3378 L-205L4 OA Tgt 4 6950.49 88.00 166.20 4135.00 4211. 70 2232. 25 -2545.08 -1578.88 56.99R 6.00 6.10 5975520 .00 581580.00 N 70. 34313773 W 149 .337 End Crv 6992.38 89.37 168.31 4135.96 4212. 66 2274. 08 -2585.93 -1569.64 -- 6.00 6.12 5975479 .26 581589.69 N 70. 34302615 W 149 .33781 8 Crv 6/100 7767.33 89.37 168.31 4144.48 4221. 18 3048. 63 -3344.74 -1412.60 179.26E 0.00 6.23 5974722 .31 581755.12 N 70. 34095322 W 149 .33654155 L-205L4 OA Tgt 5 7790.17 88.00 168.29 4145.00 4221. 70 3071. 46 -3367.11 -1407.97 179.17E 6.00 6.24 5974700 .00 581760.00 N 70. 34089213 W 149 .33650393 7800.00 87.41 168.28 4145.39 4222. 09 3081. 28 -3376.72 -1405.97 179.17E 6.00 6.24 5974690 .41 581762.10 N 70. 34086585 W 149 .33648773 End Crv 7809.65 86.83 168.27 4145.88 4222. 58 3090. 91 -3386.16 -1404.02 --- 6.00 6.25 5974681 .00 581764.16 N 70. 34084009 W 149 .33647184 Crv 6/100 8287.86 86.83 168.27 4172.31 4249. 01 3568. 17 -3853.67 -1306.97 75.21 L 0.00 6.31 5974214 .63 581866.38 N 70. 33956292 W 149 .33568372 8300.00 87.02 167.57 4172.96 4249. 66 3580. 29 -3865.53 -1304.43 75.17E 6.00 6.31 5974202 .80 581869.05 N 70. 33953054 W 149 .33566312 L-205L4 OA Tgt 6 8344.24 87.70 165.00 4175.00 4251. 70 3624. 38 -3908.45 -1293.96 75.27E 6.00 6.32 5974160 .00 581880.00 N 70. 33941327 W 149 .33557805 8350.00 87.79 164.67 4175.23 4251. 93 3630. 12 -3914.01 -1292.45 75.26E 6.00 6.32 5974154 .46 581881.57 N 70. 33939809 W 149 .33556582 8400.00 88.55 161.76 4176.82 4253. 52 3679. 74 -3961.85 -1278.02 75.17E 6.00 6.34 5974106 .79 581896.53 N 70. 33926740 W 149 .33544866 End Cnr 8408.86 88.69 161.25 4177.04 4253. 74 3688. 50 -3970.25 -1275.21 -- 6.00 6.34 5974098 .42 581899.43 N 70. 33924446 W 149 .33542586 TD / 4-1/2" Lnr 8757.15 88.69 161.25 4185.00 ~ 4261. 70 4032. 64 -4299.97 -1163.28 -- 0.00 6.38 5973770 .00 582015.00 N 70. 33834374 W 149 .33451730 • WeIlDesign Ver SP 2.1 Bld( doc40x_100) S-G\Plan L-205 (S-G)\Plan L-205L1f OA\L-205L4 (P5) 10/100 Generated 12/11/2007 1:21 PM Page 2 of 2 by Schlumberger WELL L-205L (P5) FIELD Prudhoe Bay Unit - WOA STRUCTURE L-PAD Magnetic Parameters 8urtace Location NAD2] Alaska 8hte Planes, Zone 04, US Feet Mixellaneous Model: BGGM 200] Dip: 80.665° Date: June 15. 2006 a N]0210.328 NoMing. 59]909220 ttU8 Grid GOnv; .063561966° Slot 5-G Rotary Table ~]6 ]ORabove MSL) D Mag Deo 2?.896" FS'. 5]6st 6 nT W1991930.266 Fasting 58313090 RUS Scale Faa. 099990]8503 y Date December 11.200] Plan. L-205L9 ~PS~ 10100 n 3500 O ,°~ 4000 C 0) c~ 4500 0 500 1000 1500 2000 2500 3000 3500 4000 =205P81 (P3) ._.._.._.._.._.._..:.._.._.._.._.._.._.._. ®$S`°(~2) ~~ Top Whipstock ._.S_.._.._.._.._.._.._.._.._~_.._.._.._.._.._.._.._.._:._.._.._.._ .. .._.._.._.._ _ _. ._.._.._.._.._.._.._ _ ._.._.._.._.._.._.._.._ _.._.._.._.._.._ _ Z : - - _ Base Whips[odk ~ - - - -L-2j15L4 OA Tg[ 4 L-205L0 OAT t 5 _ - - L-205L4 OA Tgt 6 • - - - - ...-..-.._..Y .' ._.._.._.._..:..._.._.._.._.._.._.._.._..-..-..-..-..L;205L40A,Tgl~3 .._. ..9. - - ... ..................... ... ..... .-... ... .. ::.:::.:::.. ... :.. . .. . ..Enncrv° .. ... ~ ' ~ ° ' ..... . . .. CIV10/190 KOP .._.. • .-..-. ....-.._.. L-sQsLaoA?at.. EdKCW a~nc cn.~~ao ._.:.._. _.._.._.._..-..-.._:.ctYruw _ ~ :Crv 6/[ti0 d .2 :~n_:: ~ _ -..L ~ rvei +ut.~ri::.._..::~::......._.._.._:. • •• • •• f a ~ ti t ~ :s:: ^:uu uses ts: our.:::a:a s: Erv ~~t~~ a st sis s:a^^: a a~iann~ann:~,a:::::z sO oo~~ sntu t s :susttsttstuusus:u:: ra:::::ans. uu::us:a:: s:aus:: a :: usnsltuut,nNUS:qutnsn as " crv tango ~ End Crv Lnr TD 14-1/2 .. .. . .. .. .. . - snua.(es>.toun ' L-205L ; ; (f ........~ .................................c............................... ....i..................................;..................................;.................... •,..................................,..... ..-..........., .................................. ............................. .................r-cost (F L-205PB1 (P3) 0 500 1000 1500 2000 2500 3000 Vertical Section (ft) Azim = 170°, Scale = 1(in):500(ft) Origin = 0 N/-S, 0 E/-V 3500 4000 • 3500 4000 5) 10/100 3) X500 • • bP Schlumberger WELL L-205 (P5) FIELD Prudhoe Bay Unit - WOA STRUCTURE L-PAD Magrreiic Parameters Motlel: BGGM 300] Dlp'. 60865° Mag Dec: X22.896' Date: June 15. 3008 F8-. 5]6515nT 6eRace Location NAD3] Alaska Stato Planes. Zone O4, US Feel Lat: N)0310328 NoMing 59]806230 RUS Gritl COm: X0.63661986° Lon: Wt49 1930.266 Easting. 583130.40 RUS Scala Fact: 099990]8503 Miscella Slot: Plan: neous 5-G ND ROI'. Rotary Table (]6.]OXabove MSLI L-205La (PSI tN100 Srry Date: December tt, 200) -2500 -2000 -1500 -1000 -500 0 -500 -1000 -1500 -2000 n n n Z 0 0 c -2500 a~ m U V V V -3000 -3500 -4000 -4500 -500 -1000 -1500 -2000 -2500 -3000 -3500 -4000 -4500 -2500 -2000 -1500 -1000 -500 f «< W Scale = 1(in):500(ft) E »> BP Alaska Anticollision Report Company: BP Amoco Date: 1.2/11/2007 Time: 13:27:37 Page: 1 ricld: Prudhoe Bay Reference Site: PB L Pad Co-ordinatc(NN;) Reference: Well: Plan L-205 (S-G), True North Reference Well: Plan L-205 (S-G) Vertical ("I'VD) Refer~ncc: L-205 Plan 76.7 Reference Wellpath: Plan L-205L~OA Dh: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are ILI~IiHaeells in thisRhlid~pal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: 4799.78 to 8757.15 ft Scan Method: Trav Cylinder North Maximum Radius: 1072.86 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath ', Date: 12/6/2007 Validated: No Version: 4 ', Planned From To Survey Toolcode Tool Name '~ ft ft i -- ~ 28.50 800.00 Planned: Plan #3 V1 (0) GYD-GC-SS Gyrodata gyro single shots ~I i~ 800.00 4799.78 Planned: Plan #2 V1 (1) MWD+IFR+MS MWD +IFR + Multi Station i 4799.78 8757.15 Planned: Plan #5 V1 MWD+IFR+MS MWD +IFR + Multi Station ~~ Casing Points - MD - 'CVD _ - Diameter - Hole Size - _ Name ft ~~ ft in in 3016.87 2741.70 10.750 13.500 10 3/4" 4799.78 4181.70 7.625 9.875 7 5/8" 8757.15 4261.70 4.500 6.750 4-1 /2" Summary <-------------; Offset Wellpath ----------> Reference Offset Ctr-Ctr No-Go Allowable Site Well' Wellpath MD 'MD Distance Area Deviation ft ft ft ft' R PB L Pad L-01 L-01 V14 PB L Pad L-02 L-02 V1 PB L Pad L-02 L-02A V5 PB L Pad L-02 L-02APB1 V2 PB L Pad L-02 L-02PB1 V21 PB L Pad L-03 L-03 V5 PB L Pad L-04 L-04 V5 PB L Pad L-101 L-101 V4 PB L Pad L-105 L-105 V4 PB L Pad L-106 L-106 V14 PB L Pad L-107 L-107 V14 PB L Pad L-108 L-108 V18 PB L Pad L-109 L-109 V12 PB L Pad L-110 L-110 V11 PB L Pad L-111 L-111 V24 PB L Pad L-112 L-112 V8 PB L Pad L-114 L-114 V15 PB L Pad L-114 L-114A V4 PB L Pad L-115 L-115 V7 PB L Pad L-116 L-116 V10 PB L Pad L-117 L-117 V11 PB L Pad L-118 L-118 V9 PB L Pad L-121 L-121 V14 PB L Pad L-121 L-121A V1 PB L Pad L-122 L-122 V6 PB L Pad L-123 L-123 V5 PB L Pad L-123 L-123P61 V3 PB L Pad L-123 Plan L-123L1 V1 Plan: PB L Pad L-124 L-124 V13 PB L Pad L-124 L-124PB1 V5 PB L Pad L-124 L-124PB2 V4 PB L Pad L-200 L-200 V7 PB L Pad L-200 L-200L1 V3 PB L Pad L-200 L-200L2 V6 PB L Pad L-202 L-202 V6 PB L Pad L-202 L-202L1 V8 PB L Pad L-202 L-202L2 V7 PB L Pad L-202 L-202L3 V8 PB L Pad L-204 L-204 V8 PB L Pad L-204 L-204L1 V5 PB L Pad L-204 L-204L2 V7 7534.62 5800.00 608.39 107.13 501.27 4800.39 4955.00 929.14 54.62 874.52 7843.74 5805.00 904.21 101.09 803.12 8660.30 6535.00 223.73 205.37 18.37 Warning Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk Pass: Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk Pass: Major Risk Out of range Out of range ', Out of range Out of range Out of range Out of range j Out of range Out of range '~~ Out of range Out of range Out of range '~, Out of range Out of range Out of range Out of range Out of range Out of range i BP Alaska Anticollision Report Company: BP Amoco Date: 12!1.1/2007 Time: 13:27:37 -- -_ Page: 2 Field: Prudhoe Bay Reference Site: PB L Pad Co-ordinate(NE) Reference: Well: Pla n L-205 (S-G ), True North Reference Well: Plan L-205 (S-G) Vertical (TV D) Refere nce: L-205 Plan 76.7 ~,~ Reference Wellpath: Plan L-205L'30A Db: Oracle Summary ~ ~ <----------- O ffset Wellpath - ------> Reference Offset Ctr-Ctr ho-Go AlloHablc ~ Site Well Wellpath MD MD Distance Area Deviation Warning ~ -ft ft ft ft ft ~ PB L Pad L-204 L-204L3 V5 Out of range ', PB L Pad L-204 L-204L4 V5 Out of range i PB L Pad L-211 L-211 V6 Out of range PB L Pad L-211 L-211 P61 V6 Out of range ', PB L Pad L-212 L-212 V11 Out of range ', PB L Pad L-212 L-212P61 V9 Out of range ', PB L Pad L-212 L-212P62 V2 Out of range ', PB L Pad L-213 L-213 V9 Out of range i PB L Pad L-218 L-218 VS Out of range ', PB L Pad L-250 L-250 V4 Out of range ', PB L Pad L-250 L-250L1 V14 Out of range PB L Pad L-250 L-250L2 V10 Out of range PB L Pad L-250 L-250P61 V4 Out of range PB L Pad L-50 L-50 V1 Out of range ', PB L Pad L-50 L-SOP61 V4 Out of range PB L Pad L-51 L-51 V6 Out of range PB L Pad NWE1-01 L-100 V2 5779.60 4705.00 907.05 92.55 814.50 Pass: Major Risk PB L Pad NWE1-01 NWE1-01 V5 5779.60 4705.00 907.05 92.55 814.50 Pass: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205 OBb V6 Plan 4800.00 4800.00 0.00 72.20 -72.20 FAIL: Major Risk ', PB L Pad Plan L-205 (S-G) Plan L-205L1 OBc V9 PI 4800.00 4800.00 0.00 72.20 -72.20 FAIL: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205L2 OBd V7 PI 4800.00 4800.00 0.00 72.11 -72.11 FAIL: Major Risk ', PB L Pad Plan L-205 (S-G) Plan L-205L3 OBa VS PI 4800.00 4800.00 0.00 72.11 -72.11 FAIL: Major Risk !, PB L Pad Plan L-205 (S-G) Plan L-205L5 Nc V3 Pla 4802.39 4805.00 33.34 59.78 -26.44 FAIL: Major Risk ', PB L Pad Plan L-205 (S-G) Plan L-205PB1 V5 Plan: 4800.96 4830.00 472.81 57.75 415.06 Pass: Major Risk ~', PB L Pad Plan L-220 (S-I) Plan L-220 V4 Plan: PI Out of range ~, PB L Pad Plan L-221 (S-P) Plan L-221 (2xx tgt) V Out of range ', PB L Pad Plan L-52 (S-E) Plan L-52 V1 Plan: Pla Out of range FieldPrudhoe Bay Site PB L Pad We11:Plan L-205 (S-G) WellpathElan L-205L~r OA -3 1 3 300 200 100 0 2 100 200 300 -3 1 3 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t TRANSMITTAL LETTER CHECKLIST WELL NAME ~~ ~, ~ ' ~ ~G 3 PTD# C~ ~ "~ ~s~o / ..~ Development` Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: /'uc~~=~co~ POOL: ~r~~t ~c Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter p~ CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is or a new wellbore segment of existing well ,G - ~~ (If last two digits in API number permit No. j-(jam-OS~ API No. 50-~- Z33$$ - Imo. are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), al! records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and l0' sample intervals throu h tar et zones. Non-Conventional please note the following special condition of this permit: Well production or production testing of coal bed mejhane is not allowed for (name of well) until after (Comaanv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. lComaanv Name) must contact the Commission to obtain advance approval of such water we!! testing ro ram. Rev: 1/1(/2008 'WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN GRIN L-205L3 Program DEV Well bore seg^ PTD#:2080560 Company BP EXPLORATION (ALASKA INC Initial ClassiType DEV I PEND GeoArea 890 Unit 11650 OnlOff Shore ~ Annular Disposal ^ Administration 1 Pe[mitfeeattached__________-_____-__--___-----_ ----_--- NlY_ ___--__-_ ------------- ------------------------------------------- ~i 2 Leese number eppropriate_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Ko- _ _ _ _ _ _ Corrected omission on-1D-401:_SurfJQC_& tflp prod inf in ADL 028238; TA_ in ApL 028241. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 Uniquevrell-name endnumker------- ----- -- ----- ------ Yes --- ------- - -- -- -- - - -------- ---- - -- --- --- ~ 4 WeIIIrlcatedin_adefined_p9ol-_-__________________________ ________Yes_____ _PRt1DHQE@AY,ORIQNSCHRBL011,-640135-governed byCO-505.____--_________-_________ 5 Well located proper distance from drilling unit_boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . _ _ _The-Schrader Bluff_Qil PoQtshall-not pe opened_in any well cigser #han 5Q0' fo-an_ _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ ~ 6 We11 located properdistancefrom other wells_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ - _ exlerosl koundary v~here ownership changes. Spacing uDifs_shall ke-a minimum-of 1 Q aEres, _ _ _ _ _ _ . _ _ _ _ . _ 7 SufFciantecreage_availakleindrillinguNt ----- -- -- -- - - ----- --Y~---- - ------ -- ------------ - - ----- ------- --------- 8 Ii deviated, iswellborePlat_included ----- - -- ---- ---- ----- Yom- - - - -------------- - --- -- --- - ----- j 9 Oparatoronlyaffectedparty------------- -- --- ---- -- -- --Yes---- - -- ----- - -- ------------ - ---- ------ - --------- 10 OparaRothas_approprialekondinfQr~---- -- --- -- -- -- ------ - Yes. -- - -- -- --- -- -- --- --- - -- ------- -- --- -- - ---------- 11 PermltcanbelssuedwlShoutconservationorder_______________.__ ______.__Yes------ ------------------...------------------.---.-.------------..-.------ Appr Date 12 PermitoanDa(ssuedwitboutadmirlistretive_appcoval---------------- ---------Yes-.---- -----------.-------------------------------------.---------------- SFD 41812008 1 13 CanPermltbt3aRRrovedbBforel5ilay.waii--------------------- ---------Yes------ -------------...------------------------------------------------- 14 -Well locatedwlthirlareaandstraiaauthorizedky_InjectionQ[der#(putlQ#in-comments)_(For_ Yes__.___ _AIO.26____________________________________________....-__--__--_____ 15 Allwells_within114-mile_ar~of[evigwldentlfiad(Forgelvicewellonly)---._ -______.__NA______ _--_._________________.____-___________-_..__.-______-___-__-..--._ 16 Pra•producedinjedoeduraflonofpreproductiooiessthart3months-(Forssrvicewellonly).--NA----- ------------------------------------------------------------------. X 17 NonGOnven.gascOnformstoAS31<05,030(j.1•A)~(1.2•A-DI --- - - ------ ~`------- -- - -- --- -- ------------------- -- -- --- - - -----. Bngknearing 18 Conductor stringprovided_._-_---_.______.--__-------- ---------NA___-__ _Coriductarset_in#.-205(206.053)._.___________________,-__-__--__-------.._-._-- 19 Sutface.casingProteotsall_knowrtUSQWs---------------------- ----------KA------ -All aquifers exempted,40CFR147.102(bl(3)andAEQ1._-------------------------- 20 CMT_uoladequata_tocirculateon_c9nduct9r8ssurf-csg_-__--_-__--__ _________NA____-__ _Surf_acecasingsetinL-205,-------------------------------------------------- ~ 21 CMT_voladequate-toiia-inlongstringtosurfs~g___________________ ____-____NA--____ _Produciion_casipgsQtin_L-204.--------.---.---_--.-------------.----------_---- 22 CMT-will cover.allknown_pmductiveharixons_____________________ ________.No__-._.. _Sl9tfedlinereomplation ptanned,_____________________--_____-.__-.__--_________ 23 Casing designs adequate for G, T, i3 & permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA _ . _ _ _ - Qdginal welt-met design specifcations. _ NA for Blotted liner.- - _ - - - - .. _ - - . - - - _ _ - - _ _ - - _ _ _ - _ _ _ _ 24 Ade4uata tarikage_or reserve pit - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes _ _ _ _ _ _ _ Rig equipped wish steel pits, No_reserve pk piarlned._ All wastet4 approved disposal wail(s), _ _ - _ - _ _ _ _ _ _ _ _ 25 Ifa_re~drilGhas-a 10~4031orabandonmentkeenapprovad_____------- ---- ---- NA__-___ .-----_--__---_.-.------_-------___-_______---.--_____.---------- 26 Adsqueta_wellkore separatlonproposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ Yes _ _ _ _ _ _ _ Pr9ximlty. analysis parfo[med. Nearest segment is ~2 iateral ~ 70' tv_d deeper.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 27 Ifdlverterrequired,doesltmeetr$gulatiQna---------------------- --------- NA------ .@QPStackwiilelready-keinplaoe.----------------------.--------------.-------- Appr Date X28 Drilling fluid_programschematic-& equip listadequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ . _ _ _ _ _ Maximum expected formation Rressure 8,6-@MW, MUII up to B.3_ppg.- - _ _ _ _ _ - - _ _ .. _ _ - - _ _ _ _ _ _ _ _ _ _ TEM 4/1012008 129 BQPIS,.do-iheymestragulation-- -- -- - - - - - -- - --Yes---- - -- --- - -------------- - -- -- --- - - ------- q ~~. , 30 BOPIr_prass rating appropriate; test to_(put psig in c9mments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ - _ 80P testplanned, _ _ _ _ _ _ _ _ _ _ _ _ _ - . MASP r~lculated a11470psi. 3500_psi _ _ _ _ _ _ _ _ _ _ _ . _ ~ G,i' L~ 31 Chpke-manlfoldcomplieswlAPI-RP-53(May$4)___________________ ________ Yes-_____ = _ _ _ _ _ _ _.-._-- 32 Wark will octet with9ut operation shutdowA- - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of Fi25 gas prokable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _ H2S not [spurted in S@production_kut is present in lift gas _Rig has sansots_and ala[ms, . - - - _ _ _ _ _ _ _ _ _ _ 34 -Mecbanical_c9ndHionofwellswtthinAORverlfied(Fprse[vicewellonly~----- ---------NA------- ----------------------------------------------------.--------------- Gaology 135 Pe[mitoan he Issued wlo hydrogan_suifide maasrrres _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _No- - _ _ _ _ _ H2S precautions will be followed; no H2s expected inreservoir,-kutsome-occurs in lift gas. - - _ _ - - _ _ - _ _ _ _ _ 36 Data_prasanted on potential gverpressurezones_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ .Expected reservoirpressura is 8;5 to 8.6 ppg EMYV; wtll be drilled wkh 9.3 pR9-mud. - - _ .. _ _ _ - _ _ _ _ _ _ _ _ _ Appr Date 37 Seismic analysis of shallowgas.zooas------------------------- ---------KA_____ ____------- --------------------------------------------------------- SFD 41812008 38 Seakadc4ndiionsurveY_(ifoff•shore)------------------------- ----------NA_____- --_---___---_---_---_-.-____---_______-----.--.------------------ '39 Contactnamelphone#orweekly-prograssrepprte(exploratoryonlyj--.-____ __-_____Yes______ _RObertTirpack 907.564.4166________________________-__--__-________________ Geologic Date: Engmearing Date P c C Date Commissioner: o er C issio r: ~~ ~'~~' ~ ~ yo -off 1 J