Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-057 STATE OF ALASKA dok ALASKA OIL AND GAS CONSERVATION COMMON WEIOMPLETION OR RECOMPLETION REPORT AND LOG7.1 I� la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned a Suspended 0 1b.Well Class-, �i� 20AAC 25.105 20AAC 25.110 ��1111 DevelopmJAN p ra ❑ GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service 0 Str- i. 2. Operator Name: 6. Date Comp.,Susp.,orAband.: 14.Permit A 1 BP Exploration(Alaska),Inc 12/2/2017 - 208-057 • 317-375 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 6/30/2008 50-029-23388-63-00• 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 7/2/2008 PBU L-205L5 • Surface: 2361'FSL,3786'FEL,Sec.34,T12N,R11E,UM • 9 Ref Elevations KB 76.10 • 17. Field/Pool(s): 3302'FSL,292'FEL,Sec.33,T12N,R11E,UM GL 47.60 • BF 48.83• PRl�}�HOE S�AAY,O N / Top of Productive Interval: -51L.1".4,-ac r'LY /tea Total Depth: 1835'FNL,4996'FEL,Sec.03,T11N,R11E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation:f f•f 74? • 2925'/2655'• ADL 028239&028241 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. DNR Approval Number: Surface:x- 583130• y- 5978082 • Zone - ASP 4 • 8630'/4115' ' 00-001 TPI: x- 581350 y- 5977679 Zone - ASP 4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 581975 y- 5973873 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No RI 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) •4640'/4081' • 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES/AZI Density/NEU/AIM /PWD 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT PULLED FT. TOP BOTTOM TOP BOTTOM 20" 129# X-56 29' 153' 29' 153' Driven 10-3/4" 45.5# L-80 29' 3026' 29' 2739' 13-1/2" 684 sx DeepCrete,402 sx Class'G' 7-5/8" 29.7# L-80 3004' 4640' 2720' 4081' 9-7/8" 413 sx Class'G' 2977' 4-1/2" 12.6# 13Cr85/L-80 3662' 8618' 3284' 4114' 6-3/4" 165 sx Class'G',Uncemented Slotted Liner 24. Open to production or injection? Yes 0 No IZI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 3540'-3669' 3561'/3197' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? a 7 l'''t Per 20 AAC 25.283 i 2 attach electronic and printed Yes 0 No Cktit4ED ,, " 4 as LCt iU 12�2�I OO information 1.L DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attached 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ...► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(torr): Press 24 Hour Rate �1 Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only ifTL- 1/12-1q( f;� • 28. CORE DATA • Conventional Core(s) Yes 0 No 0 • Sidewall Cores Yes 0 No a ' If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Permafrost-Top Well Tested? Yes 0 No 0 • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 4650' 4087' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Schrader Bluff NB 4650' 4087' Schrader Bluff NC 4703' 4120' Schrader Bluff NE 4715' 4127' Schrader Bluff NF 4831' 4179' Schrader Bluff NE(Invert) 5175' 4179' Schrader Bluff NC 5362' 4128' Schrader Bluff NB 6385' 4110' Schrader Bluff NA 7510' 4091' Schrader Bluff NB(Revert) 7572' 4093' Formation at total depth: Schrader Bluff NB 7572' 4093' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka,Joseph N Contact Name: Thompson,Jacob Authorized Title: In tion an D ntroller Contact Email: Jacob.Thompson@BP.com Authorized Signature: Date: 12/21 Contact Phone: +1 907 564 5579 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and ND for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • • 1/8/18 Per Joe Lastufka, the TPI location data for well L-205 and all of it's laterals(1-5)were incorrectly identified (by another person) on the 10-407's for completion.The TPI location data submitted with the 10-407's for abandonment are correct and have been entered into RBDMS. Liz Link • • WELL NAME: L-205L5 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 4585' Set CIBP 4558' 17.2 Gal Cement 3540' Cut& Pull Tubing 3004' Cut& Pull 7-5/8" Casing 2953' Set CIBP 2925' Set Whipstock i Daily Report of Well Operations L-205L5 ACTIVITYDATE SUMMARY T/I/0=1050/940/100, Temp=Sl. PPPOT-T(PASS), PPPOT-IC (PASS), pre RST. PPPOT-T: Stung into test port (100 psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Torqued to 400 lb/ft. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 15C) psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port(0+ psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Functioned LDS, all moved freely(1"). Torqued to 400 lb/ft. Pumped through void, good returns. Pressured void to 3500 psi for 30 min test, lost 100 psi in 15 min, lost 50 9/20/2017 psi in second 15 min (PASS). Bled void to 0 psi. ***WELL SHUT IN ON ARRIVAL*** (Sidetrack) DRIFT W/20' x 3.70" DMY WHIPSTOCK&2.00" S. BAILER, STOP PER PROGRAM @ 4600' SLM 10/15/2017 ***CONT. ON 10/16/17 WSR*** ***CONT. FROM 10/15/17 WSR*** (Sidetrack) SET 4-1/2"X-CATCHER IN X-NIPPLE @ 3486' MD PULL BK-OGLV FROM ST#1 @ 3338' MD PULL EMPTY X-CATCHER FROM X-NIPPLE @ 3486' MD ***WELL LEFT SHUT IN, PAD-OP NOTIFIED*** 10/16/2017 ****ST#1 GLM HAS AN OPEN POCKET FOR FUTURE PUMPING OPERATIONS**** T/I/0=1000/1000/100 Temp=S/I (LRS Unit 70 -Assist E-line: Load Well Pre CIBP/Cement Dump) Pumped 10 bbls meth followed by 282 bbls 1%KCL down TBG for load and kill. Pumped 3bbls meth folowed by 43 bbls DSL down TBG for FP. FP tag and caution tag hung on WV. E-Line in control of well upon departure. CV's OTG 10/22/2017 FWHP= 700/1200/600 ***JOB STARTED ON 22-OCTOBER-2017*** (SLB ELINE SET CIBP/CEMENT BAILER) WELL SHUT IN ON ARRIVAL. RUN 1: RIH W/ BAKER 10 SETTING TOOL/4.5" WFD CIBP. SET MID ELEMENT CIBP AT 4586, CCL TO MID ELEMENT= 7', CCL STOP DEPTH = 4579'. TOP OF CIBP @ 4585. S/D AND TAGGED PLUG. RUN 2: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT ON TOP OF PLUG. TOP CEMENT LEVEL=4578'. LOG CORRELATED TO 4.5" SCAB LINER TALLY DATED 09-NOVEMBER-2011 10/22/2017 ***JOB CONTINUED ON 23-OCTOBER-2017*** ***JOB CONTINUED FROM 22-OCTOBER-2017*** (SLB ELINE CEMENT BAILER) WELL OPEN FROM CONTINUATION OF PREVIOUS DAY OPERATTIONS. RUN 3: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CUMULATIVE CEMENT= 13.6'. TOP OF CEMENT= 4571.4'. RUN 4: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CUMULATIVE CEMENT= 20.4'. TOP OF CEMENT=4564.6'. RUN 5: RIH W/32' CEMENT DUMP BAILER AND DUMPED 6.8' OF CEMENT. TOTAL CEMENT LEVEL=4558'. POOH. TOTAL CEMENT DUMPED 17.2 GALLONS. LOG CORRELATED TO 4.5" SCAB LINER TALLY DATED 09-NOVEMI3ER-2011. RDMO. WELL SHUT IN ON DEPARTURE. NOTIFY PAD OP AND HAND OVER RAP ON DEPARTURE. 10/23/2017 ***JOB COMPLETED ON 23-OCTOBER-2017*** • I Daily Report of Well Operations L-205L5 T/I/O=134/980/vac Temp= S/I (LRS unit 70-Circ Out/Sidetrack) Pre-heat 260 bbls diesel tanker to 50*. Unload well down L-114 flow line. Pumping down TBG up IA through choke trailer down hard line. Spear in with 5 bbls of 60/40 followed by 278 bbls of 130* H2O followed by 150 bbls of 50*diesel. F-protected F-line L-114 with 10 bbls of 60/40, shut Inlet &choke & psi up to 500 psi with .1 bbl of 60/40. CMIT TxIA FAILED @ T/IA 2051/2064 psi (Max Applied psi 2200 Target psi 2000 psi) 1st test: 1st 15 min TP lost 135 &the IA lost 132 psi. RE-psi with a bump. 2nd test: 1st 15 min TP lost 90 psi & IA lost 90 psi; 2nd 15 min TP lost 72 psi IAP lost 72 psi for a total of 162/162 psi in 30 min. RE-psi with a bump. 3rd test: 1st 15 min TP lost 75 psi IAP lost 76 psi 2nd 15 min TP lost 58 psi IAP lost 60 psi for a total of 133/136 psi in 30 min. Bleed well head psi down & rig down for hardline crew to rig hardline down and let well stabilize. LRS or DHD will return to re-perform CMIT. Hardline crew on well on dep. Wing shut, swab 10/26/2017 shut; ssv and master open IA shut OA open AFE&Tags hung. Final Whp's=393/404/vac ***WELL SHUT IN ON ARRIVAL***(side track) RAN 3.70" CENT, 2 1/2" SAMPLE BAILER TO 4,538' SLM (no sample) TAGGED TOP OF CEMENT W/2" CENT, 1 1/2" SAMPLE BAILER @ 4,543' SLM 10/27/2017 ***WELL LEFT S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** T/I/O = 340/310Nac. Temp = SI. CMIT TxIA PASSED to 2130/2121 psi, target 2000 psi max 2200 psi. ALP = 1500 psi, SI © CV. T FL @ 90' 1.3 bbls, IA FL @ surface. Grease crew serviced WV and IA AL valve. Bled TP from 340 psi to 50 psi all gas, shut in when fluid to surface. Used 2 bbls of diesel to pressure TxIA to 2210/2200 psi. 1st test lost 62/61 psi, 2nd test lost 18/18 psi, 80/79 psi total in 30 min. Bled TP to 200 psi returned 2 bbls. Tags hung. Final WHPs = 200/200/vac. 10/28/2017 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 14:00 T/I/O = SSV/250/0 TEMP = SI, PPPOT-T(PASS) PPPOT-IC (PASS) Pre Rig PPPOT-T: Stung into test void, 0 psi on void. Monitored for 10 min, no change in pressure. Function all LDS, all moved freely. torque all LDS to 450 ft/lbs. Pump though void, good returns. Pressure void to 5,000 psi for 30 min test. Lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi R/D test equipment PPPOT-IC: Stung into test void, 0 psi on void. Monitored for 10 min, no change in pressure. Function all LDS, all moved freely. Torque all LDSto 450 ft/lbs. Unable to pump through void. Pressure void to 3,500 psi, for 30 min test. Lost 50 psi in 15, lost 0 psi in second 15 10/30/2017 min (PASS). Bled void to 0 psi. ***WELL S/I ON ARRIVAL*** (SLB ELINE TBG JET CUT) INITIAL T/I/O =270/250/0. MIRU, LPT/HPT= PASS. RUN 1: RIH W/ HEAD(FN 1-3/8")/CCL/WB(X2)/WPSA/SHOCK SUB(X3)/4-1/2" JET CUTTER. OAL= 22.4'. OAW= 203 LBS. MAX O.D. = 3.65". SHOOT JET CUTTER AT 3540'. GOOD INDICATION OF SHOT. CCL TO TOP SHOT 20.7'. CCL STOP DEPTH = 3519.3'. POOH, RDMO. FINAL T/l/O =40/50/0 10/31/2017 ***JOB COMPLETE ON 31-OCTOBER-2017. WELL LEFT S/I ON DEPARTURE*** T/I/O= 77/80Nac Temp= S/I (SIDE TRACK) Pumped 2.4 bbls diesel down IA to 1810 psi, 11/1/2017 Monitor pressure to stabilize, ***WSR Continue on 11-02-17*** i I Daily Report of Well Operations L-205L5 ***WSR Continued from 11-01-17*** CMIT-TxIA PASSED @ 2137/2138 psi, Max Applied Pressure= 2200 psi, Target Pressure= 2000 psi, (SIDE TRACK) CMIT-TxIA= Pumped .5 bbls (total of 3 bbls) diesel down IA to reach test pressure, T/IA lost 35/34 psi in 1st 15 min and 15/14 psi in 2nd 15 min for a total loss of 50/48 psi in 30 min test, Bleed T/IA pressure, Bled back— 3 bbls, OA Integrity Test= Pumped 2.4 bbls crude down OA to reach 1195 psi, Monitor pressure for 5 min, Pressure dropped to 1150 psi, No returns to surface, Bleed OAP, Bled back— 1.3 bbls, AFE sign &tags hung on well, Valve position @ 11/2/2017 departure-WV, SV, SSV, AL= Closed MV= Open IA& OA= OTG, FWHP= 22/26/0 T/I/0=100/1100/400 Set 4" CIW"H" BPV#152 Pre-Parker 272. FWP's BPV/1100/400 see 11/5/2017 log for details. T/I/BPV/0/0 R/D production tree to 4" Dryhole tree, Temp#97. Piggybacked IA&OA 11/8/2017 valves, Temp#08 &#95. FWP's BPV/0/0/ see log for details. T/I/O = BPV/0/0. Temp= SI. Bleed IA&OA to 0 psi. (Pre-Rig). IA& OA @ gauge 0, no bleed required. Well house, flow line production riser, SSV, scaffold removed. IA& OA have 2 double casing valves installed @ the 9 O'clock position. OA FL @ Surface . 11/13/2017 SV, WV= C. MV= 0. IA, OA= OTG. 23:00 T/I/O = BPV/0/10. Temp = SI. WHPs (pre RIG). Scaffold &flowline removed. Rig well house installed on well. 11/26/2017 SV= C. WV, MV, SSV= 0. IA, OA= OTG. 12:00 IP • North America ALASKA BP Page 1 VW- {`perafor1 'urt mart' '@po Common Well Name:L-205 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 i End Date: X3-018F8-C:(2,979,366.00) 1 Project:Prudhoe Bay 1 Site:PB L Pad Rig Name/No.:PARKER 272 j Spud Date/Time:4/27/2008 12:00:00AM i Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL©94.43usft(above Mean Sea Level) Date 1 From-To Hrs 1 Task 1 Code NPT Total Depth 1 Phase Description of Operations (hr) (usft) _ 11/27/2017 112:00 - 19:00 7.00 1 RIGD P PRE !GENERAL RIG DOWN OPERATIONS 1 CONTINUE TO BLOW DOWN AND RIG DOWN LINES 1 -DISCONNECT INNER CONNECTS 1 I -SKID RIG FLOOR I-LAY OVER DERRICK Ij SEPARATE MODULES AND STAGE IN 1 'PREPARATION FOR MOVE II 1 HELD PJSM WITH RIG CREW,TOOL SERVICE j AND SECURITY TO DISCUSS RIG MOVE. 119:00 - 00:00 5.00I RIGU P PRE C MOVE RIG MODULES FROM S-PAD TOWARDS 1L-PAD -ON SPINE RQAD FROM 21:00 TO 00:00 11/28/2017 100:00 - 03:30 3.50 RIGU P PRE CONTINUE TO MOVE RIG TO L-PAD ALONG L AND V-PAD ACCESS ROAD 03:30 - 05:00 1.50 RIGU P 1 PRE if STAGE DRILL MOD ON TOP OF TRANSISTION MATS.REMOVE ANNULAR DIVERTER AND I PICK UP 7-5/8 RAMS AND TREE TO BOP j I 1 HECK. 05:00 - 07:00 1 2.00 RIGU -P 1 PRE - 1 SPOT DRILL MOD OVER L-205A.MATE UTILITY IMOD AND MUD MOD TO DRILL MOD. 07:00 - 08:00 1.00 j RIGU P PRE -HOOK UP INTERCONNECTS AND RIG UP • 1 MODS 08:00 - 08:30 0.50 RIGU i P PRE RAISE DERRICK WITH 525 KLBS OFF THE !RACK 08:30 - 09:00 0.50 RIGU P PRE SKID RIG FLOOR.RAISE PIPE CAT.SKID HAUNCH. 09:00 - 16:00 7.00 I RIGU P PRE GENERAL RIG-UP OPERATIONS: 1 -RIG-UP RIG FLOOR,BRIDLE DOWN BLOCKS 1 -PERFORM API DERRICK INSPECTION -HOOK UP MUD MOD INTERCONNECT -INSTALL OFFLINE MOUSEHOLES 11 -BRING NOV WIRED DRILL PIPE CONTROL j 11 PANEL TO LER -HANG RIG TONGS -PRESSURE TEST MUD LINE TO 3500 PSI 16:00 - 17:00 1.00 RIGU P PRE PRESSURE TEST BPV FROM BELOW TO 2000 PSI FOR 5 MIN(PASS) -SEE ATTACHED TEST CHART -REVIEW PRESSURE CROSSCHECK PRIOR TO TEST j PERFORM RIG WALKAROUND AND ACCEPT 'RIG AT 16:00 HRS 17:00 - 18:30 1.50 RIGU P 1PRE NIPPLE DOWN TREE AND ADAPTER FLANGE PER FMC REP -FUNCTION AND INSPECT LOCK DOWN • SCREWS AND GLAND NUTS -CLEAN AND INSPECT HANGER THREADS 18:30 - 19:30 1.00 RIGU N I PRE INSTALL BLANKING PLUG ASSEMBLY -DUE TO POSITION OF HEAT TRACE LINE ON j • • 1 TUBING HANGER,4-1/2 IF(BOX)X 4-1/2"TCII (PIN)CROSSOVER WOULD NOT FIT.INSTALL LOWER CROSSOVER 3-1/2 IF(BOX)X 4-1/2" ITCH AND UPPER CROSSOVER 4-1/2 IF(BOX) 1 i 1X 3-1/2IF(PIN). Printed 12/11/2017 3:52:48PM 'All depths reported in Drillers Depths' IIP North Amoco- M—BP Zar ' ,; 'OPeratiOn SOMMO4 Common Well Name:L-205 1 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366 00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 19:30 - 23:00 3.50 RIGU P PRE NIPPLE UP BOPE AND HIGH PRESSURE RISER -LOWER RISER SPOOLS AND BOPE -TORQUE BOLTS TO SPEC I !-OBTAIN RKB MEASUREMENTS G______-_ _INSTALL TURNBUCKLES AND FLOW RISER 23:00 - 00:00 1.00 RIGU C STRUCT BEGIN TOP DRIVE MODIFICATION FOR WIRED DRILL PIPE: SIMOPS: -CHANGE UPPER RAMS TO 7-5/8"FIXED '-PREVENTATIVE MAINTENANCE ON BOP: I OPEN AND INSPECT ALL RAM CAVITIES -PER RA OOMQK A FLUID O PUD INSPECTION %TEST CHOKE MANIFOLD OFFLINE 11/29/2017 00:00 - 09:00 9.00 RIGU C STRUCT ;CONTINUE TOP DRIVE MODIFICATION FOR I WIRED DRILL PIPE FINISH DRILLING HOLES IN TORQUE ARRESTER FOR ZONAL MANAGEMENT 1 [SENSOR -INSTALL TORQUE ARRESTER ONTO THE j RLA 1 1-INSTALL PRE-MADE UP UPPER IBOP/ LOWER IBOP/DATA SAVER/SAVER SUB ASSEMBLY -FUNCTION TEST AND INSPECT TOP DRIVE i SIMOPS: I-HOLD RIG EVACUATION DRILL W/AAR -HOLD PRE-SPUD MEETING WITH 1 HUNDLEY'S CREW -CHANGE UPPER RAMS TO 7-5/8"FIXED -PREVENTATIVE MAINTENANCE ON BOP: OPEN AND INSPECT ALL RAM CAVITIES I-PRESSURE TEST THE CHOKE MANIFOLD I I VALVES OFF-LINE,250/3500 PSI FOR 5 I I CHARTED MIN EACH 09:00 11:00 2.00 BOPSUR P PRE RIG UP TO TEST BOPE. -FILL SYSTEM WITH WATER AND PURGE AIR. -PERFORM A SHELL TEST TO 3500 PSI FOR 5 I MIN;GOOD TEST. -RE-TORQUE ALL BOLTS ON FLANGES AND BOP RAM DOORS 11:00 - 16:00 5.00 BOPSUR P PRE I TEST BOPE TO 250 PSI LOW,3500 PSI HIGH I I FOR 5 CHARTED MINUTES EACH PER BP AND AOGCC REQUIREMENTS -TEST WITH 4",5"AND 7-5/8"TEST JOINTS -TEST ALARMS,PVT AND FLOW SHOW -TEST RAM LOCKS,HIGH/LOW BYPASS FUNCTION AND POWER BLACK-OUT , -ALL TESTS PASS,SEE ATTACHED TEST CHARTS I-TEST WITNESS WAIVED BY AOGCC REP ADAM EARL 16:00 - 17:00 1.00 BOPSUR P PRE PICKUP,INSTALL DUTCH RISER AND RUN IN LOCK DOWNS i -CLOSE ANNULAR PREVENTER ON DUTCH RISER I --__! PICK UP LUBRICATOR AND EXTENSIONS Printed 12/11/2017 3:52:48PM "All depths reported in Drillers Depths* • North America-ALASKA-BP Page 3 Operation Summary Report �/ Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay T Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL C94.43usft(above Mean Sea Level) Date From-To Hrs r Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 17:00 - 18:00 1.00 WHSUR P PRE PULL BLANKING SUB AND BPV -PRESSURE DUTCH RISER,LUBRICATOR AND QUICK-TEST SUB;GOOD TEST • -STAND BACK LUBRICATOR -PULL BLANKING PLUG THROUGH DUTCH RISER -MAKE UP LUBRICATOR AND TEST QUICK TEST SUB PULL BPV AND LAY DOWN 18:00 - 19:00 1.00 BOPSUR P I DECOMP RIG DOWN LUBRICATOR AND DUTCH RISER 19:00 - 21:00 2.00 WHSUR P 3,450.00 DECOMP .CIRCULATE BARAKLEAN SOAP PILL SURFACE TO SURFACE DOWN THE TUBING,TAKING RETURNS TO THE FLOW BACK TANK -7 BPM,800 PSI AT THE PUMP WITH 140 PSI ON THE CHOKE OUT TO THE FLOW BACK TANK -PUMPED 250 BBLS TOTAL SIMOPS: CHANGE OUT WASH PIPE ON TOP DRIVE 21:00 - 23:00 2.00 WHSUR -P j 3,450.00 DECOMP RIG UP TO PULL 4-1/2"TUBING WITH I-WIRE AND HEAT TRACE MAKE UP LANDING JOINT WITH XO AND ENGAGE TUBING HANGER -RIG UP DOYON CASING TONGS RIG UP SLB SPOOLING UNITS(x2)WITH 'SHEAVES FOR I-WIRE AND HEAT TRACE 23:00 00:00 1.00 WHSUR P 3,450.00 DECOMP ATTEMPT TO PULL4-1/2"TUBING HANGER TO RIG FLOOR BACK OUT LOCK DOWN SCREWS -HANGER PULLED OFF SEAT WITH 75 KLBS (ESTIMATED BUOYED WT OF STRING+ BLOCKS AND TOP DRIVE=74 KLBS) -PULLED UP TO 160 KLBS IN 10 KLB INCREMENTS,36"OF STRETCH WITH 85 KLBS OVERPULL -FLEX STRING UP TO 150 KLBS AND CALL ODE AND WSUP. 11/30/2017 00:00 - 02:30 2.50 WHSUR P 3,450.00 DECOMP CONTINUE TO WORK 4-1/2"TUBING HANGER TO RIG FLOOR -FLEX STRING UP TO 150 KLBS-100 TIMES -STRING PULLED FREE WITH 140 KLBS -AFTER 20'WEIGHT FELL OFF TO 85 KLBS -PULL HANGER TO FLOOR RIG FLOOR 02:30 - 03:30 1.00 WHSUR P 3,450.00 DECOMP CIRCULATE WELL CLEAN WITH A BARAKLEAN SOAP PILL -12 BPM,580 PSI -SIGNIFICANT VOLUME OF HEAVY SAND BACK -FLOW CHECK WELL FOR 10 MIN;STATIC 03:30 - 04:30 1.00 WHSUR P 3,450.00 DECOMP RIG UP TO LAY DOWN 4-1/2"TUBING WITH I-WIRE AND HEAT TRACE -TERMINATE I-WIRE -RIG UP SPOOLING UNITS -LAY DOWN TUBING HANGER AND LANDING (JOINT Printed 12/11/2017 3:52:48PM *All depths reported in Drillers Depths` • North America-ALASKA-BP Page 4 ope— Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) ;Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 I Spud Date/Time:4/27/2008 12:00:00AM 1 Rig Release: Rig Contractor.PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task , Code NPT Total Depth Phase Description of Operations (hr) j (usft) 04:30 - 15:00 10.50 t CASING P ' 3,450.00 DECOMP PULLAND LAY DOWN 4-1/2"TUBING WITH I-WIRE AND HEAT TRACE FROM CUT AT 3450' MD TO SURFACE j ! -PU 85 KLBS,SO 75 KLBS AT 3400'MD -MONITOR HOLE FILL WITH TRIP TANK; GOOD FILL , l i -RECOVER:(77 EA)FULL JTS,(3 EA)GLM IASSEMBLIES,(2 EA)X-NIPPLE ASSEMBLIES, (1 EA)GAUGE CARRIER ASSEMBLY,(1 EA) GAUGE ASSEMBLY,(1 EA)SLIDING SLEEVE ASSEMBLY,(3 EA)SPACE-OUT PUPS,(1 EA) TUBING HANGER AND PUP ASSEMBLY,(1 EA) CUT JOINT-38.35'OAL WITH 4.75"OD FLARE, 1(493 EA)5'CLAMPS,(91 EA)2'CLAMPS,(7 EA) SS BANDS,-3400'HEAT TRACE,-3410'I-WIRE -CLEAN E-LINE JET CUT,SEE ATTACHED PHOTOS 15:00 - 16:30 1.50 CASING P 3,450.00 DECOMP I RIG DOWN SLB SPOOLERS AND DOYON I CASING TONGS. CLEAN AND CLEAR RIG FLOOR. 16:30 - 17:00 0.50 CASING P 3,450.00 DECOMP I INSTALL 7-1/8"ID WEAR RING 117:00 - 17:30 0.50 FISH P 3,450.00 DECOMP I PICKUP AND MAKE UP SLB HYDRAULIC CASING CUTTER ASSEMBLY,DRESSED TO -CUT 7-5/8"CASING,PER SLB FISHING REPRESENTATIVE 17:30 - 20:30 3.00 FISH P 3,450.00 DECOMP RUN IN THE HOLE WITH SLB CASING CUTTER ASSEMBLY TO 3004'MD,PICKING UP 4"DRILL PIPE SINGLES FROM THE PIPE SHED -MW IN/OUT=9.2 PPG -PU 75 KLBS,SO 71 KLBS AT 3004'MD 20:30 - 22:00 1.50 FISH P 3,450.00 DECOMP ESTABLISH PARAMETERS AND CUT 7-5/8" CASING AT 3004'MD -45 RPM,3-7 KFT-LBS TORQUE,160 GPM,850 PSI -GOOD INDICATION OF CUT WITH OA PRESSURE INCREASE TO 310 PSI -ROTATE FOR AN ADDITIONAL 15 MIN AFTER � l OBSERVED OA PRESSURE INCREASE 22:00 - 23:30 1.50 FISH P 3,450.00 DECOMP CIRCULATE OUT OA FREEZE PROTECT TO FLOW BACK TANK -CLOSE ANNULAR PREVENTER AND LINE UP TO FLOW BACK TANK -ESTABLISH CIRCULATION AND SPOTA BARAKLEAN SOAP PILL IN THE OA -LET SOAP PILL SOAK FOR 15 MIN -CIRCULATE OUT SOAP PILL AND OA FLUIDS TO THE FLOW BACK TANK -4.5 BPM,1450 PSI WITH 65 PSI ON THE CHOKE OUT TO THE FLOW BACK TANK -SPOT A SECOND BARAKLEAN SOAP PILL ON THE BACK SIDE OF THE 7-5/8"CASING -MONITOR THE WELL FOR 10 MIN;STATIC 23:30 - 00:00 0.50 FISH P 3,450.00 DECOMP PULL OUT OF THE HOLE WITH THE SLB CASING CUTTER ASSEMBLY FROM 3004'MD TO 2380'MD -PU 75 KLBS,SO 71 KLBS AT 3000'MD -10K OVERPULL REQUIRED TO PULL CUTTERS CLEAR OF CUT Printed 12/11/2017 3:52:48PM *AII depths reported in Drillers Depths* IP North America-ALASKA-BP Page 5 0( 0' Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Datemme:4/27/2008 12:00:00AM li Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT Total Depth ! Phase Description of Operations (hr) (usft) 12/1/2017 00:00 - 01:00 1.00 FISH P 3,450.00 DECOMP I CONTINUE TO PULL OUT OF THE HOLE AND LAY DOWN SLB CASING CUTTER ASSEMBLY FROM 2380'MD -MONITOR HOLE FILL WITH TRIP TANK; GOOD FILL I-GOOD INDICATIONS OF CUT ON THE CUTTER KNIVES 01:00 - 01:30 0:50 FISH 3,450.00 DECOMP -PULL AND LAY DOWN THE 7-1/8"ID WEAR RING 01:30 - 02:00 0.50 FISH P j 3,450.00 DECOMP RIG UP TO PULL 7-5/8"CASING -RIG UP DOYON CASING TONGS -MAKE UP SPEAR ASSEMBLY PER SLB 'REPRESENTATIVE -RUN IN AND ENGAGE THE 7-5/8"CASING I WITH THE CASING SPEAR I BACK OUT LOCK DOWN SCREWS PER FMC IREPRESENTATIVE - 02:00 - 02:30 0.50 FISH P 3,450.00 DECOMP PULL 7-5/8"CASING HANGER TO RIG FLOOR AND LAY DOWN -PULLED OFF SEAT AT 115 KLBS,AS PLANNED LAY DOWN SPEAR ASSEMBLY -LAY DOWN 7-5/8"CASING HANGER 102:30 03:00 0.50 FISH- P 3,450.00 DECOMP CIRCULATE TO CLEAN UP 7-5/8"ANNULUS -10 BPM,150 PSI -MONITOR WELL FOR 10 MIN,STATIC 03:00 - 06:00 3.00 FISH P 3,450.00 DECOMP PULL AND LAY DOWN 7-5/8"CASING FROM CUT AT 3004'MD -PU 115 KLBS,SO 105 KLBS AT 3000'MD -MONITOR HOLE FILL WITH TRIP TANK; GOOD FILL -NO ISSUES PULLING OUT OF HOLE WITH CASING -RECOVER:(73 EA)FULL JTS,36.18'CUT JOINT -CASING CUT SIGNIFICANTLY DEFORMED, WITH SPLIT IN ONE SIDE;INDICATION THAT 7-5/8"CASING IS IN COMPRESSION AT LOCATION OF CUT -NEGATIVE NORM FOR ALL 7-5/8"CASING AND 4-1/2"TUBING_ 06:00 - 07:00 1.00 FISH P 3,450.00 DECOMP j CLEAN AND CLEAR RIG FLOOR AFTER LAYING DOWN 7-5/8"CASING,RIG DOWN DOYON CASING TONGS 07:00 .- 07:30 0.50 CLEAN P 3,450.00 WEXIT I RUN 9-15/16"ID WEAR RING 07:30 - 11:30 4.00 CLEAN P 3,450.00 WEXIT I MAKE UP 10-3/4"SCHLUMBERGER CLEANOUT ASSEMBLY FROM SURFACE TO 1045'MD I;-8-1/2"USED INSERT BIT,(2)9-3/4" WATERMELON MILLS,(6)6"SPIRAL DRILL 1 COLLARS,(27)5"WIRED HWDP '-FIRST RUN IN HOLE WITH NEW WIRED DRILL PIPE,REVIEW HANDLING PRACTICES WITH NOV REPAND RIG CREW Printed 12/11/2017 3.52:48PM *AII depths reported in Drillers Depths* 111, • North America-ALASKA-BP Page 6e5:80 Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay I Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase I Description of Operations (hr) (usft) 11:30 - 12:30 1.00 CLEAN P 3,450.00 WEXIT TRIP IN HOLE WITH 10-3/4"SCHLUMBERGER CLEANOUT ASSEMBLY FROM 1045'MD TO 2980'MD(UPPER WATERMELON MILL 7' BELOW PLANNED CIBP DEPTH)ON !ELEVATORS I I-4"HT-38(NON-WIRED)DRILL PIPE ' I 1-NO ISSUES RUNNING IN HOLE(NO SIGNS OF SUBSIDENCE) MONITOR DISPLACEMENT WITH TRIP TANK; IGOOD DISPLACEMENT `I-TRIPPING SPEED 90 FPM 12:30 - 14:00 1.50 CLEAN P 3,450.00 WEXIT I CIRCULATE HOLE CLEAN WITH 35 BBL HI-VIS SWEEP SURFACE TO SURFACE -730 GPM,1900 PSI !-RECIPROCATE 40'STROKE WITH MILLS I ACROSS CIBP SET DEPTH WHILE CIRCULATING -NO SIGNIFICANT SOLIDS AT SHAKERS WHEN SWEEP CAME BACK -FLOW CHECK FOR 10 MIN PRIOR TO PULLING OUT OF HOLE,STATIC 14:00 - 15:00 1.00 CLEAN P 3,450.00WEXIT TTRIP OUT OF HOLE WITH 10-3/4" SCHLUMBERGER CLEANOUT ASSEMBLY •FROM 2980'MD TO 1045'MD ON ELEVATORS I-NO ISSUES TRIPPING OUT OF HOLE ' -MONITOR HOLE FILL WITH TRIP TANK; GOOD FILL 1-TRIPPING SPEED 200 FPM H- 15:00 - 16:30 1.50 CLEAN P 3,450.00 WEXIT 1RACK BACK AND LAY DOWN 10-3/4" SCHLUMBERGER CLEANOUT ASSEMBLY FROM 1045'MD TO SURFACE i-RACK BACK 5"WIRED HWDP AND 6"DUMB 'IRON DRILL COLLARS FOR UPCOMING • WHIPSTOCK RUN -FLOW CHECK FOR 10 MIN PRIOR TO I PULLING NON-SHEARABLES THROUGH THE STACK 1 16:30 - 17:00 0.50 DHB P 3,450.00 WEXIT I MAKE UP 10-3/4"BAKER CIBP AND RUNNING (TOOLS -FLOW CHECK FOR 10 MIN PRIOR TO RUNNING IN HOLE,STATIC 17:00 - 18:30 1.50 DHB P 3,450.00 WEXIT TRIP IN HOLE WITH 10-3/4"BAKER CIBP FROM SURFACE TO 2955'MD ON 4"HT-38 DRILL PIPE -TRIPPING SPEED 100 FPM 18:30 - 19:00 0.50 DHB P 2,953.00 WEXIT SET BAKER CIBP AT 2953'MD(TOP OF PLUG), ! RELEASE FROM RUNNING TOOL AND RACK BACK ONE STAND -TOP OF PLUG ESTIMATED TO BE 6'ABOVE 10-3/4"COLLAR AT 2959'MD Printed 12/11/2017 3:52:48PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 7 Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 1 End Date: fX3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor.PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 DHB P 2,953.00 WEXIT PRESSURE TEST 10-3/4"CASING AND BAKER CIBP TO 2000 PSI FOR 30 MIN -TEST AGAIN ST ANNU LAR PREVENTER -2 BBLS TO PRESSURE UP,2 BBLS BLED BACK 75 PSI LOST IN FIRST 15 MIN,25 PSI LOST IN SECOND 15 MIN;TEST PASSES ACCORDING 1 TO ACCEPTANCE CRITERIA 3B IN BP PRACTICE 100218(10-45) TEST APPROVED BY WSUP -USE PRESSURE CROSSCHECK PRIOR TO 1 INITIATING TEST -SEE ATTACHED PRESSURE TESTING CHART j AND CALCULATOR 21:00 - 21:30 I 0.50 DHB P 2,953.00 WEXIT !DISPLACE WELL TO 9.6 PPG LSND MILLING FLUID 1 -750 GPM,950 PSI _ 121:30 - 22:00 0.50 DHB P 2,953.00 WEXIT !TRIP OUT OF HOLE WITH CIBP RUNNING ;TOOL FROM 2860'MD TO SURFACE ON 1 ELEVATORS,LAY DOWN RUNNING TOOL -TRIPPING SPEED 200 FPM 22:00 - 22:30 0.50 DHB P 2,953.00 WEXIT CLEAN AND CLEAR RIG FLOOR 22:30 - 23:30 1.00 BOPSUR P 2,953.00 WEXIT CHANGE UPPER RAMS FROM 7-5/8"FIXED TO ' 2-7/8"X 5"VARIABLES SIMOPS:CHANGE OUT DUMB IRON HT-38 SAVER SUB TO WIRED DS-50 SAVER SUB 23:30 - 00:00 0.50 BOPSUR P 2,953.00 WEXIT SERVICE RIG FLOOR PIPE HANDLING EQUIPMENT 12/2/2017 100:00 - 02:00 2.00 BOPSUR P I 2,953.00 WEXIT TEST UPPER 2-7/8"X 5"VARIABLE RAMS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MIN EACH WITH 5"TEST JOINT � I -MAKE UP 5"TEST JOINT -PULL 9-15/16"WEAR RING -INSTALL TEST PLUG -PRESSURE TEST RAMS -PULL TEST PLUG -INSTALL 9-15/16"WEAR RING -RIG DOWN TESTING EQUIPMENT 02:00 - 03:30 1.50 STWHIP P 2,953.00 WEXIT MAKE UP SCHLUMBERGER 10-3/4" • 1 WHIPSTOCK ASSEMBLY FROM SURFACE TO 1138'MD -10-3/4"WHIPSTOCK,9-3/4"TRIMILL,(6)6" DRILL COLLARS AND(27)5"WIRED DS-50 HWDP OUT OF DERRICK 1-FLOW CHECK FOR 10 MIN PRIOR TO RUNNING IN HOLE,STATIC 03:30 - 08:30 5.00 STWHIP P 2,953.00 WEXIT TRIP IN HOLE WITH SCHLUMBERGER 10-3/4" WHIPSTOCK ASSEMBLY FROM 1138'MD 2900' MD ON ELEVATORS -RUN ON 5"WIRED DS-50 DRILL PIPE SINGLES FROM THE PIPE SHED -TRIPPING SPEED 60 FPM -MONITOR DISPLACEMENT WITH TRIP TANK; GOOD DISPLACEMENT Printed 12/11/2017 3:52:48PM *All depths reported in Drillers Depths* • North America-ALASKA-BP Page 8 Operation Summary Report Common Well Name:L-205 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/27/2017 End Date: X3-018F8-C:(2,979,366.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 272 Spud Date/Time:4/27/2008 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001709 Active datum:L-205A ACTUAL @94.43usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 08:30 - 09:00 0.50 STWHIP P 2,925.00 EXIT ! WORIENT WHIPSTOCK TO 40°LEFT OF HIGHSIDE AND SET WITH TOP OF SLIDE AT 2925'MD I-ORIENT WITH MWD 1-TAG EZSV AT 2953'MD AS EXPECTED -PICK UP 2'AND SET WHIPSTOCK PER SCHLUMBERGER FISHING REP -SLACK OFF 40 KLBS TO CONFIRM SET AND •SHEAR MILLS FROM WHIPSTOCK 09:00 - 10:00 1.00 STWHIP N 2,925.00 WEXIT ATTEMPT TO INITIATE MILLING WITH NOVOS SYSTEM AND TROUBLESHOOT -NOVOS OUTPUT INCORRECT PUMP RATE, 1 ROP AND WOB PARAMETERS -TROUBLESHOOT AND RE-INITIALIZE 'SYSTEM TO RESOLVE ISSUE 10:00 - 16:00 6.00 STWHIP P i 2,941.00 WEXIT MILL 9-3/4"WINDOW FROM TOP OF artia- WHIPSTOCK AT 2925'MD TO BOTTOM OF L- /�/'� WHIPSTOCK AT 2941'MD PER SCHLUMBERGER FISHING REP -520 GPM,1240-1275 PSI,60-90 RPM,6-8 KFT-LBS TQ INITIATE MILLING WITH 1 KLBS WOB,1 FPH ROP,60 RPM INCREASE TO 3-5 KLBS WOB,3 FPH AND 90 RPM AFTER FIRST 1.5'OF MILLING MW 9.6 PPG IN/OUT NOVOS AND SOFTSPEED ACTIVE SIMOPS:BUILD STANDS OF WIRED 5"DS-50 j DRILL PIPE OFFLINE SLOW PUMP RATES @ 2925'MD WITH 9.6 !PPG LSND: MP#1:30 SPM=185 PSI,40 SPM=230 PSI MP#2:30 SPM=180 PSI,40 SPM=235 PSI 16:00 - 20:30 4.50 STWHIP P 2,961.00 WEXIT I DRILL 20'OF NEW FORMATION FROM 2941 MD TO LEAK-OFF TEST DEPTH OF 2961'MD 1-520 GPM,1250-1280 PSI,90 RPM,7-8 1 KFT-LBS TQ,2 KLBS WOB -NOVOS AND SOFTSPEED ACTIVE -DRIFT WINDOW WITH/WITHOUT PUMPS AND ROTATION WITH NO ISSUES I-SIMOPS:BUILD STANDS OF WIRED 5"DS-50 DRILL PIPE OFFLINE 20:30 - 21:30 1.00 1 STWHIP P 2,961.00 WEXIT CIRCULATE HOLE CLEAN WITH 35 BBL HI-VIS SWEEP SURFACE TO SURFACE -650 GPM,1750 PSI,80 RPM,7 KFT-LBS TQ I-RECIPROCATE PIPE 60'WHILE - CIRCULATING -NO INCREASE IN CUTTINGS OBSERVED AT !SHAKERS FROM SWEEP -FLOWCHECK WELL FOR 10 MIN(STATIC) Printed 12/11/2017 3:52:48PM 'All depths reported in Drillers Depths* VVELLF-EAD= FMC L-2 0 5 SAR: 'I TES:WELL ANGLE>700 @ 5257°"""M OTFERBORE ACTUATOR= awnnEso • (L1, L2, L3, L4 & L5) ABOVE OBd SLOTS IS ALL 13CR(TBG,PUPS,EMS) KB.B_EV= _ 76 1' Rff H.Ei% 761' 20"COND, H 153' J BF.ELEV= 48.83' 129#,X-56, 2926' 1H 10-3/4"WHIPSTOCK(12/02/17) -161";"------ 300' O=18.770" _________ ng____- -0^ 2953' 10-3/4"COP 12/01/17 Max Angle= 103°@ 5878' H ( ) Datum NO= WA 3004' 1-17-5/8"CSG STUB Datum TVD= __ 4400'SS ______ 10-3/4"CSG, -I 3026' �I , 45.5#,L-80 BTC,D=9.95" 4-1/2"JET CUT TBG(10/31/17) - 3540' ►M! ►� 3558' H 7-5/8"X 4-1/2"HES TNT PKR,ID=3.856" Minimum ID: 3.688" @ 4837' 3591' I-14-1/2"HES X NIP,O=3.813" BKR HOOK HGR ASSY w/SEALING LEM 3620' H4-1/2"HES X NIP,ID=3.813" 4-1/2"TBG, 12.6#,13CR VAM TOP, H 3666' _------- 3659' H 7-5/8"X 4-1/2"SETTING SLV,D=3.950" .0152 bpf,O=3.958" et ►1 3666'1-14-1/2"MIJLESHOE,O=3.958" DUMP BAIL CMT(10/23/17) -I 4558' •r•4% .' ►�**4 • -It, _ �•0 3673' I-17-5/8"X 4-1/2"PREM PKR,O=3.870" 4-1/2"WFD CIBP(10/22/17) 4585° 0 -_, 4605° _-I5-314"FORTED SEAL STEM ASSY,ID=4.750" 4-1/2"LNR, 12.6#,13CR-85 VAM TOP, H 4593' - .0152 bpf,O=3.958" _ $800' -14-1/2"OP{10/19111) - --- L5{fes; LEM WINDOW 47° 7-5/8 X 5-1/2"BKR ZXP LTP H 4604' (N )f„ 4 1/2" RA TAG 6522' &TEDK,O=4.970" �`-L.5 l��b 4640'-4653' mg 60' - - - - - OPENING WIDTH=3.33" 5-1/2"X 4-1/2"XO,O=3.940" -i 4624' 4781' I]-17-518"X 5-1/2"BKR ZXP LTPITIEBK,O=4.970" BAKER HOOK HANGER ASSY H 4636' 0 w/L3 SEALING LEM,O=3.688" \ 4800'48 • _H 19'SEAL BORE EXTENSION,0=4.75" 7-5/8"RA T AG + 4726° 4$19° 1H5-1/2"X 4-1/2"XO.ID=3.958" 13CR LEM#3 LOWERSEAL ASSY,O=3.880" -I 4813' ril \ 6a Ian _ _ - - 123_01_ - - L4(OA)LEM WINDOW 566' BAKER HOOK HANGER ASSY -I 4837' ` L4(QA) 4-1/2"RA TAG @ 6898' 4841'-4853' w/L2 SEALING LEM,O=3.688" OPENING WIDTH=3.33' 7-5/8"RA TAG -I 4943° 4945" ]-7-5/8"X 5-1/2"BKR ZXP LTP/TEBK,D=4.970" 13CR LEM#2 LOWER SEAL ASSY,O=3.90" -I 4974° 0 BAKER HOOK HANGER ASSY ---I 4999' 4964' II--119-1/2'SEAL BORE EXTENSION,O=4.75" w/L7 SEAL!<JG LEVI,O=3.688" IIII 4983' -H5-1/2"X 4-1/2"XO.D=3.910" L3 IOBa)LEM WINDOW 62° 7-5/8"RA TAG -I 5084° L3(OBa) 4-1/2"RA TAG @ 7357' 5002'-5015' 13CR LEM#1 LOWER SEAL ASSY,D=3.88" H 5148' OPENING WIDTH=3.33" II 5101' 1-17-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,O=4.950" 7 5/8"CSG,29.7#,L-80 BTC-M H 5582' ` :go .0459 bpf. D=6.875" 5132' 1-119'SEAL BORE EXTENSION,ID=4.75" 4-1/2"SOLE)LNR,12.6#,13CR-80 H 5594' 5151' 1-15-1/2"X 4-1/2'XO.O=3.880" VAM TOP,.0152 bpf,0=3.958" I 1 PERFORATION SUARY I I "31 REF LOG:SWS LWD VARIOUS DATES I I L-205(01313) ANGLE ATTOP PERE: N/A � ,, :�,� �- Note:Refer to Production DB for historical perf data 5614' 6"WFD FLOW THRU ALUMINUM BLLET LNR 1 I�' SIZE SPF TIN TERVAL Opn/Sgz DATE ® (H3B YND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION �_ Ll (0(3c) I. f I .:. 4-1/2"SOLD LNR, 12.6#,L-80, _1 8955' L2 5751' 6"WFD FLOW THRU ALUMINUM BILLET LNR .0152 bpf,D=3.958" OBd) J(BEHIND SLOTTED UNH) DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNT 07/08/08 N9E5 ORIGINAL COMPLETION 11/01/17 MS/JMD JET CUT TBG(10/31/17) WELL: L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO PERAK No:2080530(540)(580)(550)(560)(570) 07/26/17 JNUJMD ADDED REF&BF REV AR No:50-029-23388-00(60)(64)(61)(62)(63) 08/03/17 JGL/JMD PILLED XX PLUG(07/31/17) SEC 34,T12N,R11 E,2361'FSL&1493'FW_ 10/17/17 JMG/JMD GLV C/0(10/16/17) 10/24/17 BTN/JMD SET CnP&DUMP BAIL CMT BP Exploration(Alaska) • L-205 (L1, L2, L3, L4 & L5) IlliP r I 11 R 1 I 1 1 z. K 4v = ;o!►! Nb PBTD 8616' I - - ►_. 4-1/<"SWELL PKR @ 04', 5449',6540'&7035,ID.`3.90' II 14 - - - - - - PERFORATION SUMMARY 4636' 8630',6.75"L5(Nb) REF LOG:SWS LWD VARIOUS DATES 4-1'2"LNR L-80 IBT-M. .0152 bpf. ID=3.958" ANGLE AT TOP PERF:WA • Note:Refer to Production DB for historical perf data OA PBTD H 8750' SIZE SPF ZONE INTERVAL C n/Sgz DATE ,� \ 4-1/2" SLID Nb 5480-6522 "C 07/05/08 w ® - 4-1/2" SLID Nb 7061-8574 "C 07/05/08 _4-1/2"SWELL PKR @ 4925,5279',6915'&7419",ID=3.90" 4-1/2" SLID OA 5320-6898 0 06/29/08 .. - 187-187- 4-1/2" SLID OA 7445-8709 0 06/29/084853'-8763',675"L4 (OA) 4-1/2" SLID OBa 5478 7357 0 06/23/08 -' 1.1 2" LNR L-80 IBT-M. .0152 bpf. ID=3.958° 4-1/2" SLID OBa 7918-8797 0 06/23/08 Ig 4-1/2" SLID OBb 6382-8910 0 06/06/08 • 4-1/2" SLID OBc 5774-6098 0 06/10/08 OBa PBTD H 8839° 4-1/2" SLID OBc 6413-8948 0 06/10/08 '� 1131 4-1/2" SLID OBd 5594-5827 0 06/16/08 4-1/2"SWELL PKR @ 5045',5419',7374'&7893",ID=3.90" 4-1/2" SLID OBd 5913-7501 0 06/16/08 �, 4-1/2" SLID OBd 8020-8886 0 07/07/08 Nal —ZI 4999'-8850' 6 75" ] OBa; 4-1,2"LNR. L-80 IBT-M. .0152 bpf ID=3 958" "'NB PERFS BOLA I ttl ` , OBb PBTD H 8951' X X 4-1/2"SWELL PKR @ 5847,ID=3.90" 1�1 '4*" ;:�' 5813'-8953',6.75"L-205(OBb: 4-1/2"RA T AG -I 5847° '--------.-------1. I 11 gr;/ 4-1'2" LNR,L-80 IBT-M, 0152 bpf.ID=3.958" \I 11 OBc PBTD 8988' 4-1/2"SWELL PKR =3.90" 5865° • ----------- 4-1/2" 4-1/2"SWELL PKR@ 6116',0=3.90" 4-1/2"RA TAG 7508" 1;/ 1r/ 4-1/2"SWELL PKR,U=3.90" — 7526° 5751'-`:990'.6.75"L1 (OBc) 4-1/2'SWELL PKR,ID-3.90" 7996' N �'1 4-1 2" LNR, L-80 IBT-M. 0152 bpf, ID=3.958" OBd PBTD 8955' r; L2 r; 5101'-8965'.6.75"L2 (OBd) is Bd) 4-1/2"LNR. L-80 IBT-M. .0152 bpf. ID=3.958" DATE REV BY COMUNTS DATE REV BY CONINUVTS ORION MIT 07/08/08 N9ES ORIGINAL COMPLETION 11/01/17 MS/JND JET CUT TBG(10/31/17) WELL: L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO PERMIT No:2080530(540)(580)(550)(560)(570) 07/26/17 JNUJMD ADDED REF&BF ELEV AFI No:50-029-23388-00(60)(64)(61)(62)(63) 08/03/17 JGUJNEI FULLED XX PLUG(07/31/17) SEC 34,T12N,R11 E,2361'FSL&1493'FAA_ 10/17/17 JMG/JMD GLV C/O(10/16/17) 10/24/17 BTN/JNV SET CEP&DUMP BAt CMT BP Exploration(Alaska) • VOF7 • 60" I//7,' THE STATE Alaska Oil and Gas ►►. ®f I,A sKA. Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ��ALASY'� Fax: 907.276.7542 www.aogcc.alaska.gov Kenneth Allen Engineering Team Lead E_P 1 1 LU",; BP Exploration(Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Orion Schrader Bluff Oil Pool, PBU L-205L5 Permit to Drill Number: 208-057 Sundry Number: 317-375 Dear Mr. Allen.: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, f Cathy '. Foerster Commissioner DATED this C'day of September, 2017. RBDMS 1,(/ SEP - 8 2017 STATE OF ALASKA IllekLASKA OIL AND GAS CONSERVATION COMMIN APPLICATION FOR SUNDRY APPROVS 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill ® • Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 208-057 ' Exploratory 0 Development I1- 3. Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-23388-63-00 99519-6612 Stratigraphic 0 Service 0 • 7. if perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? i,---,-- Will planned perforations require a spacing exception? Yes 0 No RI L-205L5 • ,ht k°4: ,a 9. Property Designation(Lease Number): 10. Field/Pools: qq f ADL 028239&028241 • PRUDHOE BAY,ORION SCHRADER BLUFF OIL t�', f 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): ective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): ii440( e.it, JunkNW/"'" 8630 • ..4145"q%/f 3486 3132 1602 3486.4800 None Casing Length `Y Size MD TVD Burst Collapse Structural $6'C' I1 Conductor 124 20" 29-153 29-153 3060 1500 Surface 2997 10-3/4" 29-3026 29-2739 5210 2480 Intermediate 5555 7-5/8" 27-5582 27-4102 6890 4790 Production Liner 4956 4-1/2" 3662-8618 3284-4114 8430 7500 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 5481-8574 4105-4113 4-1/2"12.6# 13Cr80 24-3669 Packers and SSSV Type: 4-1/2"HES TNT Perm Packer Packers and SSSV MD(ft)and ND(ft): 3561/3197 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary RI Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ® Exploratory 0 Stratigraphic 0 Development ® • Service 0 14.Estimated Date for Commencing Operations: September 1,2017 15. Well Status after proposed work: Oil 0 WINJ 0 WDSPL 0 Suspended lif ' 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Raese,J.Kyle be deviated from without prior written approval. Contact Email: john.raese@bp.com Authorized Name: Allen,Kenneth W Contact Phone: +1 9075644629 Authorized Title: Engineerin Team Lead Authorized Signature: Date: // COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: �f 317-376 Plug Integrity 0 BOP Testi Mechanical Integrity Test 0 Location Clearance ❑ Other: ,3t P h.-5t f 3 5O Uter ,(,-114a� p 1—r l'e�5 ✓ 5,-( }--rs-t t-d z 5-6 �a�� y Post Initial Injection MIT Req'd? Yes 0 No Spacing Exception Required? Yes 0 No I' Subsequent Form Required: 0 p —4 U7— n APPROVED BYTHE p Approved by: /Vet..7 ✓20.4.4...../. COMMISSIONER COMMISSION Date: T..G_ !7 ORIGINAL ,-ermx7 RBDMS L,LLr - d Z017 -- 9:x_/7 Submit Form and Attachments in Duplicate Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. • RECEIVED bP AUG 0 8 AOGCC G p 613 .r frodh L-205L5 Sundry Application Well Type: Producer Current Status: Shut-in Request:Abandon for rotary rig sidetrack Planned Pre-Rig Work Start Date: September 1, 2017 Planned Rig Start Date: November 1, 2017 MIT-OA Passed to 1080 psi (8/4/2016) MIT-IA Passed to 3500 psi (11/17/2011) PPPOT-T Passed to 5000 psi (8/2/2016) PPPOT-IC Passed to 3500 psi (8/2/2016) MASP: 1,602 psi (8.96 ppg EMW in Schrader Bluff-OBc at 4,379'TVDss with 0.1 psi/ft gas gradient) Well History: The L-205 well was drilled and completed in 2008 as a multi-lateral well. L-205 has major damage at the L5 junction and has produced sand and rocks, rendering it unfit for production. There is currently an obstruction at the L5 junction restricting access below. All remaining options to re-access the L- 205 laterals have been exhausted. Due to the history of solids production and the inability to clean the . wellbore, it has been released for sidetrack. 6910/e. A 8-47 Scope of Work: Prior to rig arrival, a bridge plug will be set in the 4-1/2" scab liner and 25' of dump bail cement will be placed on top of the plug. Top of cement will be tagged and wellbore integrity will be verified.The tubing will then be cut above the production packer. The rig will pull the 4-1/2" tubing and cut and pull the 7- 5/8" casing from—3000' MD.A bridge plug will be set above the 7-5/8"casing stub. A whipstock will be set on the bridge plug and a window will be milled in the 10-3/4" surface casing. BP is requesting a variance from 20 AAC 25.112 Well Plugging Requirements c.1.E. The objective --� of the L-205A sidetrack is to drill a slant well near the existing L-205 laterals so that their remaining reserves may be accessed via hydraulic fracturing and produced through the new sidetrack. For this reason, it is not desired to abandoned the existing laterals with cement. Instead of cementing individual laterals, it is proposed that a bridge plug will be set in the 4-1/2" scab liner(above all lateral junctions) with 25' of dump bail cement on top to satisfy abandonment requirements. However, it is proposed to set the bridge plug at —4100' MD which is greater than the 50' maximum above perfs as stipulated in 20 AAC 25.112.c.1.E. The shallower set depth is proposed due to obstructions encountered near the L5 junction and to help ensure successful setting of the plug. Note that the 4-1/2" scab liner has been fully cemented and that the top of annular 7-5/8" casing cement is estimated at—4000' MD. Thus, the dump bail cement at—4100'MD will complete a full lateral cement barrier above the Schrader reservoir. L-205L5 Sundry 1 8/7/2017 • • 7Po Proposed Pre-Rig Operations: Step Service Operation 1 S Drift for CIBP &Je)Cut. 2 E Set CIBP at 41,0'0' MD. Dump Bail 25' Cement. F A/EL: Load &'Circ Well. CMIT-TxIA to 2000 psi. E Jet Cut Tubing at—3540' MD 3 S D&T Cement. 4 F CMIT-TxIA to 2000 psi. MIT-OA to 1200 psi. 5 W PPPOT-IC and PPPOT-T. Function LDS. 6 V Install Dry Hole Tree. Install Annulus Valves. Set BPV. Proposed Drilling Rig Operations: 1. MIRU Parker 272. 2. Test BPV from below to 2000 psi. 3. Nipple down dry hole tree. Nipple up BOPE and test to 3500 psi. 4. Pull BPV. Circulate out freeze protect. 5. Pull the 4-1/2"tubing from the pre-rig jet cut at—3540' MD. 6. MU casing cutter and cut 7-5/8"casing at—3000' MD. 7. Pull 7-5/8"casing from cut. 8. RIH with 9-3/4"clean out assembly down to the top of the 7-5/8"casing stub. 9. RU E-line and set bridge plug at—2900' MD. Pressure test 10-3/4"casing to 2000 psi. 10. PU 10-3/4"whipstock and 9-3/4"window milling assembly. Orient and set the whipstock at —2900' MD. 11. Displace the well to LSND milling fluid. End of Sundry/Start of Permit to Drill 12. Mill window in the 10-3/4"casing plus 20'-50' of formation. 13. Perform LOT. POOH. 14. MU 9-1/2" production drilling BHA(GR/RES/PWD/NEU/DEN) and drill through Schrader Bluff sands to TD at—7531' MD. Perform short trip. POOH. 15. Run 7-5/8" casing to TD and cement. Test casing to 3500 psi. 16. Install the 7-5/8"pack-off and test to 3500 psi. 17. Freeze protect the 10-3/4"x 7-5/8"annulus. 18. MU perforating assembly with MWD and fire guns on depth across multiple Schrader Bluff target zones. POOH. 19. MU cleanout assembly and clean across perforations. POOH. 20. Run 4-1/2"completion with production packers and frac sleeves spaced out across the multiple Schrader Bluff target zones. 21. With completion spaced out, RU E-line and log RA tags to confirm the completion is on depth. Land the tubing hanger. 22. Reverse circulate brine and corrosion inhibitor. Drop ball and rod and set production packers. Test tubing to 4000 psi. Test IA to 3500 psi. 23. Shear GLV and circulate freeze protect to —2000' TVD. Set TWC and test to 3500 psi. L-205L5 Sundry 2 8/7/2017 • • 24. Nipple down BOPE. Nipple up adapter and dry hole tree and test to 4500 psi. 25. RDMO Parker 272. Proposed Post-Rig Operations: Step Operation 1 Install Tree. Pull TWC. 2 Pull Ball &Rod. Pull RHC. Install DGLV. 3 MIT-T. MIT-IA. Injectivity Test. 4 Frac-Pack Well. Cleanup. 5 Install Generic LGLV. 6 Flowback Test. Drilling Engineer: Kyle Raese (907) 301-6405 Production Engineer: Alex Youngmun (907) 564-4864 Geologist: Sean Wagner (907) 564-4129 L-205L5 Sundry 3 8/7/2017 • • • Loepp, Victoria T (DOA) From: Raese,J. Kyle <john.raese@bp.com> Sent: Thursday,August 31,2017 5:57 PM To: Loepp,Victoria T(DOA) Cc: Allen, Kenneth W;Thompson,Jacob; Lastufka,Joseph N Subject: RE: PBU L-205(PTD 208-053, Sundry 317-376) Plug for Redrill Attachments: L-205 -Pre-Rig.pdf Victoria, Ok,thank you.Attached is the updated pre-rig schematic to reflect the new plug depth. Thanks, Kyle Raese Drilling Engineer BP Exploration (Alaska) 0:907-564-4629 c:907-301-6405 From:Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,August 31,2017 5:41 PM To: Raese,J. Kyle<john.raese@bp.com> Subject: Re: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Yes Sent from my iPhone On Aug 31, 2017,at 5:16 PM, Raese,J. Kyle<john.raese@bp.com>wrote: Victoria, We will attempt to set the bridge plug at 4586' MD(50'above the L5 junction at 4636' MD). If we are unable to drift that deep with the bridge plug due to obstructions,would it be acceptable to set it as deep as possible? Thanks, Kyle Raese Drilling Engineer BP Exploration(Alaska) o:907-564-4629 c:907-301-6405 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,August 31,2017 2:43 PM 1 . • To: Raese,J. Kyle<john.raese@bp.com> Subject: RE: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Kyle, The regulations(20 AAC 25.112(c)(1)(E))state the mechanical bridge plug should be set no more than 50 feet above the top of the perforations. A depth somewhat closer to the junction would be desirable. Thanx, Victoria From:Raese,J. Kyle [mailto:john.raese@bp.com] Sent:Tuesday,August 29,2017 12:21 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Allen, Kenneth W<Kenneth.Allen@bp.com>;Thompson,Jacob<Jacob.Thompson@BP.com>; Lastufka,Joseph N<Joseph.Lastufka@bp.com> Subject: RE: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill Victoria, The obstructions near the L5 junction appear to start at 4619'on the most recent slickline drifts to this depth. Note that this drift run was performed two years ago with tools slightly under gauge to the OD of the proposed 4-1/2"CIBP. My intent in proposing to set the CIBP at^'4100'was keep away from the obstructions in order to avoid issues setting the CIBP.That being said, it is likely possible to set the CIBP deeper than 4100'. Do you have a preferred depth range? The 7-5/8" annular TOC estimate was determined using volumes recorded during the cement job with an assumed 30%open hole washout(typical for our intermediate sections). No losses were noted during the job. Thanks, Kyle Raese Drilling Engineer BP Exploration(Alaska) 0:907-564-4629 c:907-301-6405 From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Friday,August 25, 2017 10:30 AM To: Raese,J. Kyle<john.raese@bp.com> Subject: PBU L-205(PTD 208-053,Sundry 317-376) Plug for Redrill John, Where is the top of the obstructions near the L5 junction? Can the CIBP be set deeper in the wellbore? How was the TOC in the 7-5/8" annular estimated? Thanx, Victoria Victoria Loepp 2 TREE= 4-1/16"CW FLS L-205 Pre-Rig WELLHEAD= FMC • SAFETYES:WELL ANGLE>70° '" 5257 ""MOTHERBDRE ACTUATOR= CMVME60 (L1 , L2, L3, L4 & L5) ABOVE 0 SLOTS IS ALL 13CR(TOG,PUPS,LEMS) KB.ELEV= 76.1 20"COND, -1 153' i I BF.ELEV 74.38' 129#,X-56, Li 2196' -14-1/2"HES X NIP,ID=3.813" KOP= 300' ID=18.770" GAS LIFT MANDRELS Max Angle= 103°Ldi 5$78' ret Cut tubing at-3540' MH ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum MD= NIA 4-1/2"CIBP at 4586'ML 3 2349 2174 33 KBG2 DMY BK 0 11/16/11 Datum TVD= 4400'SS w/25'of dump bail cement willir 2 3220 2904 31 KBG2 DMY BK 0 11/16/11 10-3/4"CSG,45.5#,L-80 8TC,ID=9.95" 3026' 1 3338 3005 31 KBG2 SO BK 20 12/10/11 4-1/2"GAUGE CARRIER,ID=3.864" 3413' 1 In 3429' -14-1/2"HES SLD SLV,ID=3.813" 4-1/2"GUAGECARRIER,ID=3.864" -1 3453' 1. - 3486' --I4-112"HES X NIP,ID=3.813" o / 3558' H 7-5/8" X4-1/2"ISS TNT PKR ID=3.856 -5/8 annular TOC at 4000' MD (30%washout) 3591' --H4-1/2"HES X NIP,ID=3.813" �� 3620' -14-1/2"HES X NIP,ID=3.813" 4-112'TBG, 12.6#,13CR VAM TOP, H 3666' 1 3659' H7-5/8"X 4-1/2"SEI 1 NG SLV, ID=3.950" .0152 bpf,ID=3.958" - ��� 3666' -14-1/2"MULESHOE,ID=3.958" 4-1/2'LNR, 12.6#,13CR-85 VAM TOP, -1 4593' �i�j� ►4 S' 3673' -7-5/8"X 4-112'PREM PKR, ID=3.870" .0152 bpf, ID=3.958" - '4!! 4605' -5-3/4"FORTED SEAL STEM ASSY,ID=4.750 7-5/8"X 5-1/2"BKR ZXP LIP H 4604' &TIEBK,ID=4.970" • . 4624' -�4-1/2"IBP(10119/11) 5-1/2'X 4112 XO,ID=3.940" -1 4624' �' L5(Nb)LEM WINOOW 47° L5(Nb) 4-1/2" '( RA TAG @ 6522' 4640'-4653' rig BAKER HOOK HANGER ASSY H 4636' _ lerOPENING WIDTH=3.33" w/L3 SEALING LEM, ID=3.688" I ' ��. 0 4781' -I7-5/8"X 5-112"BKR ZXP LTP/TIEBK,ID=4.970" 7-5/8"RA TAG -1 4726' 111 13CR LEM#3 LOWER SEAL ASSY,ID=3.880" -1 4813' BAKER HOOK HANGER ASSY H 4837' 1 4800' -119'SEAL BORE EXTENSION, ID=4.75" 4819' -15-1/2"X 4-1/2"XO.ID=3.958" III - - - -�-®- - L4(OA)LEM WINDOW 56° w/L2 SEALING LEM,ID=3.688" L,4 (QA) 4-1/2"RA TAG @ 6898' 4841'-4853' 7-5/8'"RA TAG H 4943' OPENING WIDTH=3.33" 4945' -17-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.970" 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" H 4974' CS 0 I 4964' -119-1/2'SEAL BORE EXTENSION,ID=4.75" BAKER HOOK HANGER ASSY --f 4999' w/L1 SEALING LEM,ID=3.688" 4983' H5-1/2"X4-1/2"X0.ID=3.910" ..7. i L3(OBa)LEM WINDOW 620 7-5/8"RA TAG --1 5084' L'3( ) 4-1/2"RA TAG @ 7357' 5002' 5015' 13CR LEM#1 LOWER SEAL ASSY, ID=3.88" H 5148' OPENING WIDTH=3.33" Hai in 5101' -17-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.950" 7 5/8"CSG,29.7#,L-80 BTC-M -1 5582' s .0459 bpf. ID=6.875" 5132' H 19'SEAL BORE EXTENSION, ID=4.75" 4-1/2"SOLID LNR, 12.6#,13CR-80 - 5594' VAM TOP, :0152 bpi, ID=3.958" f I 5151' --15-1/2"X 41/2"XO. ID=3.880" .. i I I PERFORATION SUMNA.RY = REF LOG:SWS LWD VARIOUS DATES I I L-205(OBb) ANGLE ATTOPPERF: N/A IN 4':,t. Note:Refer to Production for historical perf data :. "4";!'" 5814' 1-6"WFD FLOW THRU ALUMINUM BILLET LNR SIZE j SPF 1 INTERVAL Opn/Sqz DATEi (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION � LlO�c ( ) 1 I I I � 41/2"SOLID LNR,12.6#,L-80, -1 8955' fig3 5751' -6"WFD FLOW THRU A LiAAhIUM BILLET LNR .0152 bpf,ID=3.958" \ O:. (BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BBYCOMMENTS ORION UNIT _ 07/08/08 N9ES ORIGINAL COMPLETION WELL: L-205,L1,L2,L3,L4&L5 11/17/11 1)18 RING PERMIT No:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMO DRLG DRAFT CORRECTIONS(12/06/11) API No:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRLG DRAFT CORRECTIONS SEC 34,T12N, R11 E,2361'FSL&1493'FWi. 12/13/11 TP/JMD TREE SWAP(11/21/11) 12/13/11 JLJ/JMD GLV C/O(12/10/11) BP Exploration (Alaska) VVELLHEAD= FMC L-/L SAFETY NOTES:WELL ANGLE>70°§5257'*"^'MOTl-U ORE ACTUATOR= aW ME60 • (LI, L2, L3, L4 & L5) ABOV SLOTS IS ALL 13CR(TBG,PUPS,LEMS) KB.ELEV= 76.1' R�ELH1_ �_ 76.1' 2196' H4-112"HES Xfes,D=3.813" BF.ELEV= - 48.83 20„ . - 153'' GAS LFT MANDRELS KOP= 300' ST MD TVD DEV TYPE VLV LATCH FORT DATE Max Angle 103°@ 5878' VW X-56, D=18 770• 110 3 2349 2174 33 KBG2 DMY BK 0 11/16/11 Datum tu0= NA 2 3220 2904 31 KBG2 DMY BK 0 11116/11 Datum TVD= 4400'SS / ' 1 1333813005 31 I KBG2 � SO I BK 20 �12/10/11 1 10-3/4"CSG,45.5#,L-80 BTC,0=9.95" -I 3026' oir 3429' H4-1/2"HES SLD SLV,D=3.813" 4-1/Z"GAUGE CARFER ID=3.864" - 3413' 3486' H4-1/2"HES X NP,D=3.813" 4-1/2"GUAGE CARR6�D=3.864" 3453• ►1 3558' H7-5/8"X 4-1/2"HES TNT FKR,D=3.856" 4-1/2"XX RUG w/EQ DEV(10/23/16) - 3486' 3591 {4-1/2"HES X NP,D=3.813" Minimum ID: 3.688" 4837' 3620' HI4-1/2"HES x NP,D=3.813" BKR HOOK HGR ASSYw/SEALING LEM3559' 7.5/8"x4 1/2"SEfT1NGSLV D=3.950" 4-1/2"TBG,12.6#,13CR VAM TOP, - 3666' ����:�. .�.� 3666' -�4-1/2"MULESHOE ID=3.958" 0152 bpf,D=3.958' �.�.� ►••. 4-1/2'LNR, 12.6#,13CR-85 V A M TOP, H 4593' I Ii 10 4•��� 3673' 7-5/8"X 4-1/2"MEM FKI�13=3.870' .0152 bpf,D,=3.958" ►�/ _. 4606' H 5-3/4"PORTED SEAL STEM ASSY,ID=4.750" 7-5/8'X 5-1/2'BKR ZXP LTP -{ 4604' ill4800' H4-1/2"BP(10/19/11) S TEBD K, =4.970' h • - t»-- L5{Nb'Lai Wim' *' 5-1/2"X 4-1/2"XO,ID=3.940" -) 4624° L5(Nb) "4-1/2- - -RA TAG @' 6522' 4640'_465T OgE BAKER HOOK HANGER ASSY 4636' ® ail YG W M-,=3.33" w/L3 SEALNG LEM,D=3.688" 0 ►�4 4781' -I7-5/8"X 5-1/2"BKR ZXP LTP/TEBK,0=4.970" 7-5/8"RA T AG -I 4726' r 4800' -119'SEAL BORE EXTENSION,D=4.75" 13CR LEM#3 LOWER SEAL ASSY,D=3.880' H 4813' ill 4819' -5-1/2"X4-1/2"XO.D=3.958" BAKER HOOK HANGER ASSY -I 4833 �-�- WI L2 SEALING LEM,ID=3.688" III /,' 4-1/2'RA TG @ 6898' L4 OA)LEM 369 1\ 4641` 4853' •• •• -110--IST- - - WIDTH=333" 7-5/8"RA TAG H 4943° 4945' H 7-5/8"X 5-1/2"BKR ZXP LTF TEBK,ID=4.970" 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" -I 4974' 0 ►r4 BAKER HOOK HANGER ASSY --I 4999' 4964' -119-1/2'SEAL BORE EXTENSION,D=4.75" 116 w/L1 SEALING LEM,D=3.688" 4983' --15-1/2"X 4-1/2"XO.ID=3.910' VIVDOW 7-5/8"RA T AG H 50$4' MI L3(01:304- 1/2"RA TAG @ 7357' L3 tOl3a)5002:-X15' 62° 13CR LEM#1 LOWER SEAL ASSY,13=3.88" --I 5148' WIDTH=3-33 el ■ 5101' HI7-5/8"X 5-1/2"BKR ZXP LTP(TEBK,D=4.950" 7 5/8"CSG,29.7#,L-80 BTC-M -I 5582' o ;igin .0459 bpf. 13=6.875" 5132 -119'SEAL BORE EXTENSION,D=4.75" 4-1/2"SOLD LW, 12.6#,13CR-80 H 5594' 5151' H5-1/2"X 4-1/2"XO.D=3.880' VAM TOP,.0152 bpf, 0=3.958" I I I PERFORATION SUMMARY .-. REF LOG:SVVS LWD VARIOUS DATES I I L-205(0E113) ANGLE AT TOP PERF: WA � I I s •,, :" Note:Refer to Production DB for historical perf data 00 • 5814' 6"WFD FLOW THRU ALUMNUM BLLET LNR SIZE SPF IN I tt:VAL �'�' Opn/Sqz DATE I (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION I I I I 4-1/2"SOLID LNR, 12.6#,L-80, -I 8955' N 5751' 6"VVFD FLOW THRU ALUMNUM BLLET LNR .0152 bpf,ID=3.958" \ :�: (BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BY COt ANTS ORIONUNT 07108108 N9ES ORIGINAL COMPLETION 10/24/16 ZV/JM) SET XX PLUG(10/23/16) WELL: L-205,L1,12,L3,L4&L5 11117/11 D16 MVO 07/26/17 JNUJM) ADDED REF&BF ELEV PERMT No:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD DRLG CRAFT CORRECTIONS(12/06/11) AR No:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRLG CRAFT CORRECTIONS SEC 34,T12N,R11 E,2361'FSL&1493'EMIL 12/13/11 TP/JMD TREE SWAP(11/21/11) 12/13/11 JU/JM) GLV GO(12/10/11) BP Bcploration(Alaska) • (L1, L2, L3, L4 & L5) IP NC [/1 IR . . � ....• :�.0� Nb PBTD 8616' ._. ._. - . 1:El-- - ._. IIII 4-1/2"SWELL PKR g 1,04', 5449',6540'&7035',D=3.90' I PERFORATION SUMMARY ►-,, 0463 -8630'.6.75' REF LOG:SWS LWD VARIOUS 041 ES 4-1;2"LNR`3C BT-Mt.0152 bpf. D=3 958" ANGLE AT TOP PERF.WA Note:Refer to Production D8 for historical perf data OA PBTD H 8750' SIZE SPF ZONE NTB2YAL Opn/Sqz DATE / 11,„4-1/2" SLTD Nb 5480-6522 07/05/08 ® - - - 4-1/7 SLTD M 7061-8574 07/05/08 ®4-1/2"SWELL PKR a 4925',5279',6915'&7419",0=3.90" 4-1/2" SLID OA 5320-6898 0 06/29/08 -1:01-- - - 4-1/2" SLID OA 1 7445-8709 0 06/29/08 I 4853'-3'63'.6 75" 4-1/7 SLID OBa 5478-7357 0 06/23/0810 ►-, 14-• 2. ',_N, _ .. -8C 8T-M 0152 opf C=3 958 4-1/7 SLID OM 7918-8797 0 06/23/08 4-1/2" SLID OBb 6382-8910 0 06/06/08 OBa FSTD 88 ° 4-1/2" SLID OBc 5774-6098 0 06/10/08 4-1/2" SLID OBc 6413-8948 0 06/10/08 4-1/2" SLID 08d 5594-5827 0 06/16/08Ill 4-1/2"SNAIL FKR 0 5045',5419',7374'&7893",D=3.90" 4-1/2" SLID OBd 5913-7501 0 06/16/08 4-1/7 SLID 08d 8020-8886 0 07/07/08 ( 4999'-8850' 6-75" al 4-1 LNR. -SC BT-M. 0152 bpf 0=3.958" °N8 PSS ISOLATED , .- CBb PBTD H 8951' X 4-1/2"SIMI.L PKR @ 5842',0=3.90" II 5813'-8953'.6.75" •4 112"RA T AG ---1 5847° I .0 ,p v� 4-112'LW. L-80 BT-M .0152 bpf, ID=3.958" 11 OBc FSTDH 8988' 4-1/2"SWELL FKR D=3.90" — 5865' ------------- 4-1/2" /— 4-1/2"SWELL PKR @ 6116',13=3.90" 4-1/2'RA T AG — 7508' '8 4-1/2"SWELL PKR,D=3.90" — 7526' — 5751'-'990' 6 75" 4-1'2' L4R. L-80 8T-M. 0152 bpf. ID=3 958" 4-1/2"SWELL PKR,D=3.90" —1 7996' 8 013d PBTD — 8955' g 5101'-8965'.6.75" `L • 4-1'2"LN . _-8,01137.-M. 0152 bpf ID=3.958" DATE REV BY COMMENTS DATE REV BY COMaENTS ORION UM- 07/08/08 N9E5 ORIGINAL COMPLETION 10/24116 ZV/JMD SET XX RUG(10/23/16) WELL L-205,L1,L2,L3,L4&L5 11/17/11 016 RHO 07/26/17 JNJJMD ADCED REF&BF ELEV PERMIT Na:2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD CRLG DRAFT CORRECTIONS(12/06/11) AFI No:50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC CRLG DRAFT CORRECTIONS SEC 34,T12N,R11 E,2361'FSL&1493'FWL 12/13/11 TPYJMD TREE SWAP(11/21/11) 12/13/11 JLJ/JMD GLV GO(12/10/11) BP Exploration(Alaska) P RO P O ® NOTES: WELL ANGLE>70°G� WELLHEAD= 11'FI+AC L-205 - ACTUATOR= , REV 2 R) :31�ES&T OKB.REV= 77.6' BF. —7-1 REV= 53.80° / KOP= 380' 20#COPD H 153• / 4 112"HES X NP,13=3.813- Max Angle= °@ 'J Aticurvircomuzem-2,9:0 ND GAS LIFT MANDRELS Datum MD= I ST MD TVD DEV TYPE VLV LATCH PORT I DATE Datum TVD= 4400'SS --- 10-3/4"WHIPSTOCK( /_/ ) -I 26o0' 10-3/4"CSG.45.5#,L-80,ID=9.95" H 2900' 1.....1. .1C 7-5/8"CSG,29.7#,L-80 XO TO 13Cl2 SO - VAM TOP HC,D=6.875" [TT I 1-14-1/2" 1-ES SLD St Minimum ID = 3.725" @ XXXX' 0 H4-1/2"SGM-N3PG-CA SNGLEDROP SAPPHIRE 4-1/2" HES XN NIPPLE GAUGED=3.864" Hs H4-112"HES X NP D=3.813" RA TAG 4-1/2"TUBING COLLAR - RA TAG 7-518 CSG COLLAR - \\\1 V , H7-5/8"X 4-1/2"HES TNT FKR,I)=3.856" I -4-1/2"HES XNIP,ID=3.813" I -4-1/2"NCS FRAC PORT,D=3.958" MEM H 4-112"NCS SCREEN SLEEVE,D=3.958" XX. -17-5/8"X 4-1/2"FES TNT FKR,D=3.856" -I4-1/2"NCS FRAC FORT,D=3.958" IMIIIIII' 1 I--4-1/2"NCS SCREEN SLEEVE,D=3.958" XH 7-5/8"X 4-1/2-HES TNT FKR,D=3.856" H 4-112"NCS FRAC PORT,D=3.958" to nni III -4-1/2"NCS SCREEN SLEEVE,13=3.958" X [X -17-5/8"X 4-1/2"HES TNT PKR,D=3.856" FEREORATION SUMMARY '1 , -14-1/2"NCS FRAC FORT,D=3.958" REF LOG: ANGLE AT TOP PERF: Note:Refer to F-oduction DB for historical pert data III MI II H 4-1/2" NCS SCREEN SLEEVE SIZE SPF ZONE INTERVAL Opn/Sgz DATE H7-5/8"X 4-1/2"lIES TNT FKR,D=3.856" 4-3/8" 7 Nb 6175-6292'MD 0 s 4-3/8" 7 OA 65606670'MD 0 I -14-1/2"NCS FRAC FORT,D=3.958" 4-318" 7 OBa 6731-6814'MD 0 4-3/8" 7 OBb 6833-6892'MD 0 4-3/8" 7 OBc 6987-7073'MD O ® I-4-1/2"NCS SCREEN SLEEVE,13=3.958" 4-3/8" 7 OBd 7120-7260'1W 0 4-3/8" 7 CBs X X H7-5/8"X 4-1/2"FES TNT FKR,D=3.856" n• -11-1/2"NCS FRAC FORT,D=3.958" IIIA III III H4_1/2-NCS SCREEN SLEEVE,D=3.958" —I H 7-5/8"X 4-112"HES TNT PKR,D=3.856" 4-1/2"TBG,12.6#,13CR-S0 VAM TOP - .0152 bpf,ID=3.958' 7-5/8"CSG,29.7#,13CR-SO VAM TOP HC, - I I H 4-1/2"FES XN NP,D=3325" D=6.875" --kH4-1/2"WLEG,D=3 958" DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 02/22/04 N9ES ORIGINAL COMPLETION WELL: L-205A 11/25/09 D-16 RENO pT No: 6 SIDETRACK(L-205A) AR No: 50-029-23388-01 08/08/16 NN BULT PROPOSED SEC 34,T12N,R11 E,2361'FSL&1493'FWL 08(08/16 JH BULT PROPOSED REV II BP Exploration(Alaska) LN 3 m g y. § •m 0 N U — m50 O W O W m \ m g G 1 = N LL O 5 3 3�3 N d 9 R oa i-55 �� g>>o�o o2c nm3 > i$ 2 n -0®8 tn o Z N M (7 2 e dd z<S n J� ~ S=zz" x• 1 g g 3 x77,7•er N�e�i M› 22i' ..m mvii `<'22, UNy-- .AAA �nM M\ '" = I NAA n\\ ( Y 1 gz m�n� -.J..� ��� ,__,_3 c xN ——— H- II Q I o 1 s il Wog -o----- il Qhs Q-0. W- ----— li & g..� $�A g5. 85'5. 2g �� ~ ann an S7- 8 cgs U ,■■ • t 5 1 I I 4 ELWW U O li W – I 3. ,f, }. .1,_ ti o C\\ 0 W OA)YI7137 9Nco -1 -g I 0 —A/f 9-.9 .11-,U ,Z/l Ol-,R O 5 O $ oda M'J9m3O) .9Y9Y TREE= 4-1116"CW FLS L-205 Pre-Rig WELLHEAD= FMC • SAFETYES:WELL ANGLE>70°(2 525T"'"MOTHERBORE ACTUATOR= ONVNE60 (L1, L2, L3, L4 & L5) ABOVEOBd SLOTS IS ALL 13CR(TBG,PUPS,LEMS) KB. ELEV= 76.1' 20"GOND, H 153' BF ELEV= 74.38' 129#,X-56, 2196' -14-1/2"HES X NIP,ID=3.813" KOP= 300' 0=18 770" GAS LIFT MANDRELS Max Angle= 103°@ 5878' ret Cut tubing at-3540' MD ST MD TVD DEV TYPE VLV LATCH FLIRT DATE Datum MD= N/A 4-1/2"CIBP at-4100'MD N 3 2349 2174 33 KBG2 DMY BK 0 11/16/11 Datum TVD= 4400'SS w/25'of dump bail cement 2 3220 2904 31 KBG2 DMY BK 0 11/16/11 -110-3/4"CSG,45.5#,L-80 BTC,ID=9.95" H 3026' 11. 1 3338 3005 31 KBG2 SO BK 20 12/10/11 41/2"GAUGE CARRIER,ID=3.864" 3413' .®�3429' H4-1/2"HES SLD SLV,ID=3.813" 4-1/2"GUAGE CARRIER,ID=3.864" H 3453' 1 . 3486' -14-112"HES X NIP, ID=3.813" .mzi 3558' H7-5/8"X 4-112"FES TNT PKR,ID=3.856" 7-5/8" annular TOC at-4000' MD (30%washout) 3591' -14-1/2"HES X NIP,ID=3.813" 3620' -14-1/2"HES X NIP,ID=3.813" 4112 TBG, 12.6#,13CRVAM TOP, H 3666' ` 3659' -7-5/8"X41/2"SEI IINGSLV, ID=3.950" .0152 bpf,ID=3.958" R .=� 3666' H4-1/2"MULESHOE,ID=3.958" 4-1/2"LNR 12.6#,13CR-85 VAM TOP, - 4593' III4.-V ►�': &. ►•4 3673' 7-5/8"X 4-12 PREM PKR, ID=3 870 0152 bpf,ID=3.958" 0 j_� 4605' 5-3/4"PORTED SEAL STEM ASSY, ID=4.750" 7-5/8"X 5-12"BKR ZXP LTP H 4604' 4624' H4-1/2"IBP(10/19(11) &TIEBK,ID=4.970 \ ea _ER _ - L5(Nb)L8N WINDOW 47° 5-1/2"X 412 XO, ID=3.940 -I 4624' L (Nb) 4-1/2" RA TAG @ 6522' 4640'-4653' elABA KER HOOK HANGER ASSY --I 4636' _ _ - - -�- OPENING WIDTH=3.33" w/L3 SEALING LEM,ID=3.688" 0 4781' H7-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.970" 7-5/8"RA T AG H 4726' 13CR LEM#3 LOWER SEAL ASSY,ID=3.880" -I 4813' 4800' 19'SEAL BORE EXTENSION,ID=4.75" 4819' -15-112"X 4-1/2"XO. ID=3.958" BAKER HOOK HANGER ASSY -{ 4837' I-'-- _ w/L2 SEALING LEM,ID=3.688" .01-20- - L4{OA}LEM WINDOW 56° L4 t 4-1/2"RA TAG @ 6898' 4841'-4853' 7-5/8"RA TAG H 4943' 1-111 OPENING WIDTH=3.33" 4945' H 7-5/8"X 5-1/2"BKR ZXP LTP/TIEBK,ID=4.970" 13CR LEM#2 LOWER SEAL ASSY,ID=3.90" -I 4974' 0 0 4964' .H19-1/7 SEAL BORE EXTENSION,ID=4.75" BAKER HOOK HANGER ASSY - 4999' w/LI SEALING LEM,ID=3.688" 4983' -15-1/2"X4-1/2"XO ID=3.910" L3(OBa)LEM WINDOW 62° 7-5/8"RA TAG -1 5084' lii L3 t�) 4-1/2"RA TAG @ 7357' 5042' 5015' 13CR LEM#1 LOWER SEAL ASSY, ID=3.88" 5148' OPENIIG WIDTH=3.33" \ RI 5101' H7-518"x5-112'BKR ZXP LTP/TIEBK,ID=4.950" 7 5/8"CSG,29 7#,L-80 BTG-M --I 5582' .0459 bpf. ID=6.875" 5132' H19'SEAL BORE EXTENSION,ID=4 75" 4-1/2"SOLID LNR, 12.6# 13CR-80 H 5594' X VAM TOP, 0152 bpf, ID=3.958" I I 5151' -I5-112"X 4-1/2 XO. ID=3.880"' I PERFORATION SUMMARY - REF LOG: SWS LWD VARIOUS DATES I 1 L-205(OBb) ANGLE AT TOP PERF N/A .. .4t. Note: Refer to Production DB for historical pert data 00 C 5814' -6"WFD FLOW THRU ALUMINUM BILLET LNR SIZE 1 SPF INTERVAL Opn/Sqz DATE 2 ► (BEHIND SLOTTED LINER) SEE PAGE 2 FOR PERFORATION INFORMATION E LI (c) 4-1/2"SOLID LNR, 12.6#,L-80, -1 8955' 2 L2 g 5751' 6"WFD FLOW THRU ALUMINUM BILLET LNR .0152 bpf,ID=3.958" `OBd) (BEHIND SLOTTED LINER) DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 07/08/08 N9E5 ORIGINAL COMPLETION WELL: L-205,L1,L2,L3,L4&L5 11/17/11 D16 RWO FERMT No 2080530(540)(580)(550)(560)(570) 12/15/11 CK/JMD DRLG DRAFT CORRECTIONS(12/06/11) AFt No 50-029-23388-00(60)(64)(61)(62)(63) 12/08/11 PJC DRLG DRAFT CORRECTIONS SEC 34;T12N, R11 E,2361'FSL&1493'FW.. 12/13/11 _TP/JMD TREE SWAP(1121/11) 12/13/11 JLJ/JMD GLV C/O(12/10/11) BP Exploration(Alas ka) • I Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon"or "Suspend" boxes are also checked, cross out that erroneous entry and V initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial the j it on both copies of the Form 10-403 (AOGCC's and operator's copies). v Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code,they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~,(~ 8 - ~ ~~ Well History File Identifier Organizing (done) RESCAN r~olor Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: Two-sided IIIIIIIIIIIIIIIIII DIGITAL DATA ~iskettes, No. ^ Other, No/Type: ^ Rescan Needed III IIIIIIII II III III OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: /s/ IIIIIIIIIIIIIIIIIII Project Proofing BY. Maria date: ~ /s/ Scanning Preparation _~. x 30 = ~ + ~~ =TOTAL PAGES (Count does not include cover sheet) gY: Maria Date: d~/ /s/ Production Scanning Stage 1 Page Count from Scanned File: ) ~ 3 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: p2 ~ ~~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /S/ IIIIIIIIIII is com lete at this Dint unless rescanning is required. III II'I I Scanning p P ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ nts about this file: Quality Checked III II'lll III II'I III Comme 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ALASKA IL AND GAS CONSERVATION COMMIS~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ~ Lateral Shut-Off Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-ente Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development ^~ Exploratory 208-0570 3. Address: P.O. Box 196612 Stratigraphic^ Service .API Number: Anchorage, AK 99519-6612 50-029-23388-63-00 8. Property Designation (Lease tuber) : 9. Well Name and Numb ADLO-028241 L-205L5 10. Field/Pool(s): ~PRUDHOE BAY FIELD / ORION SCHRADER BLUFF POOL F 11. Present Well Condition Summary: Alaska Oil ~ 6a~ Cam. Comm Total Depth measured 8630 feet Plugs (measured) None feet ~~~~®C~1~ true vertical 4364 feet Junk (measured) None feet Effective Depth measured 8630 feet Packer (measured) 4542 true vertical 4364 feet (true vertical) 4012 Casing Length Size MD TVD Burst Collapse Structural Conductor 3982' 4-1/2" 12.6# L-80 4636' - 8618' 4078' - 4114' 8430 7500 Surface 209' 4-1/2" 12.6# 13CR80 4604' - 4813' 4056' - 4173' 8430 7500 Intermediate Production Liner Liner Perforation depth: Measured depth: SL 5481' - 6522' SL 7061' - 8574' _ True Vertical depth: 4105' - 4108' 4098' - 4113' _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR80 SURFACE - 4612 SURFACE - 4062 Packers and SSSV (type, measured and true vertical depth) 7-5/8"x4-1 /2" BKR PRM PKR 4542 4012 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~~~~!~~~y ~al~ :~ ~ 2~ ~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 900 411 17 554 Subsequent to operation: 782 319 14 664 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Taylor West Printed Name Taylor West Title Production Engineer Signature ~~~ Phone 564-4647 Date 2/25/2010 Bien vnn iv-•rvr ncviac~ ~icwy ~ ~irrV~~~~ ~K ~ ~ `Y~ 7Ly1 ~• /• ~~ ~u~~~~~~ ~~~y~~~d~ ~~~~y TREE = CMJ 20" CONDUCTOR 129#, X-56, ID = 18.770" 10-314" CSG, 45.5#, K-55 BTC, ID = 9.95" - 4-1/2" GUAGECARRIER, ID=3.864" ~ 4-1 /2" GA UGE CA RRIER, ID = 3.948" L-2 Qj S TES: ***MOTHERBORE ABOVE OBd (L'1, L2, L3, L4 & L5) SLOTS IS ALL 13CR (TBG, PUPS, LEMS)*** Minimum ID: 3.688" @ 4837' BKR NOOK HGR ASSYw/SEALING LEM (7-518" X 5-112" BKR ZXP LTP/TIEBK, ID = 4.970" 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" BAKER HOOK HANGERASSY w/ L3 SEALING LEM, ID = 3.688" 7-518" RA T AG 13CR LEM #3 LOWER SEAL ASSY, ID = 3.880" BAKER HOOK HANGER ASSY w/ L2 SEALING LEM, ID = 3.688" 7-518" RA T AG (13CR LEM #2 LOWER SEAL ASSY, Ib = 3.90" ~ BAKER HOOK HANGER ASSY w1 L1 SEALING LEM, ID= 3.688" 7-5/8" RA T AG 13CR LEM #1 LOWER SEAL ASSY, ID = 3.88" 7 518" CSG, 29.7#, L-80 BTC-M .0459 bpf. ID = 6.875" 4-112" SOLID LNR, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.958" 4' PERFORATION SUMMARY REF LOG: SWS LWD VARIOUS DATES ANGLE AT TOP PERF: N!A Nate: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSgz DATE SEE PAGE 2 FOR PERFORATION INFORMATION 4-1i2" SOLID LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 4-1/2" HES X NIP, ID = 3.813" I GAS I IFT MANDRFI S ST MD TV D DEV TYPE V LV LATCH PORT DATE 4 2761 2518 33 KBG2 DOME BK 16 09(20(08 3 3915 3504 29 KBG2 DOME BK 16 09/20/08 2 4126 3686 33 KBG2 DMY BK 0 09120!08 1 4339 3859 38 KBG2 SO BK 20 09/20108 4457' --~ 4-1 /2" BKR CMD SLD SLV, ID = 3.813" 4542' 7-5/8" X 4-112" BKR PRM PKR, ID = 3.875" 4569` 4-1/2" HES X NIP, ID = 3.813" 4( 59U' l- j 4-1(2" HES X NIP, ID = 3.813" 4612' 4-1/2" FLUTTED WLEG, ID = 3.958" 4624" 5-112" X 4-112" XO, ID = 3.940 -~ - ~- L5 (Nb) LEM WINDOW 47° L5 (Nb) -1/2" RA TAG @ 6522' 4640' - 4653' ~~ '~' OPENING WIDTH = 3.33" 4781" 7-5/8" X 5-112" BKR ZXP LTPITIEBK, ID = 4.970" 4800 19' SEAL BORE IXTENSION, ID = 4.75" 4819` 5-1/2" X 4-112" XO. ID = 3.95ig" ~ 6° - - - - ~~ - - L4 (OA) LEM WINDOW 56° L~ (("~} 4-112" RA TAG @ 689 4841' - 4853` ~` ~ - - - - ~~ OPENING WIDTH = 3.33" 4945` 7-518" X 5-112" BKR ZXP LTPITIEBK, ID = 4.970" 4964" 19-1/2' SEAL BORE IXTENSION, ID = 4.75" 4983" 5-112" X 4-1/2" XO. ID = 3.910 ® L3 (OBa} LEM WINDOW 62° ( ) 4-112" RA TAG @ 7357' 1 L3 ~ 5002' - 5015' ~- OPENING WIDTH = 3.33" 5101' 7-518" X 5-1/2" BKR ZXP LTPRIEBK, ID = 4.950" ~ 5~ 132' I--~ 19' SEAL BORE EXTENSION, ID = 4.75" / 5151 " 5-112" X 4-1 /2" XO. ID = 3.880" I I I I ~ ---- i I L 2115 (OBb}- - - - I 5814' 6" WFD FLOW THRU ALUMINUM BILLET' LNR I (BEHIND SLOTTED LINER) L'1(OBc) - - - - - ~ 5751' 6" WFD FLOW THRU ALUMINUM BILLET LNR ~no.a~ (BEHIND SLOTTED LINERI DATE REV BY COMMENTS DATE REV BY COMMENTS 07!08108 N9ES ORIGINAL COMPLETION -~~~ ~-- -~~~-~~~---- 12/14/08 JLJ/PJC GLV GO (09/20!08) 12(14/08 ?! PJC DRLG DRAFT CORRECTIONS 12/17/08 TW/PJC FINAL DRLG DRAFT 06!30109 TW/TLH PERF DATE CORRECTIONS ORION UNIT WELL: L-205, L1, L2, L3, L4 & L5 PERMIT No: 2080530 (540) (550) (560) (570) (580) API No: 50-029-23388-00 (60) (61) (62) (63) (64) SEC 34, T12N, R11 E, 2361' FSL & 1493' FWL BP Exploration (Alaska) i L-205 2/25/2010 • Background: L-205 is a hexa-lateral producer completed in 7/08 with six laterals targeting the Schrader Bluff reservoir sands. The N sand (L5 lateral) is suspected of producing sand that accumulates in the mainbore, which restricts production from lower laterals. Two FCOs of the mainbore have been performed which resorted production to over +2000 BOPD but the well appears to sand-off days or weeks later. After the last FCO, a sand bridge appears to have formed under the L5 lateral, resulting in lower PI, and eventually the well died -possibly due to a hydrate plug in the tubing. The objective of this procedure is to clean out any hydrates from the tubing, remove fill from the mainbore, to isolate the N-sand (L5 lateral) and redrift the mainbore to ensure it is clean. Once these operations are complete, the well will be produced & sand content monitored. By sleeving the N-sand lateral, we hone to see better on-time, and determine if the N-sand lateral is the lugging culprit. Additional interventions may follow to reduce plugging while allowing offtake from the N-sand lateral. L-Z 05 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 2/11/2010~ASRC Test unit #1, assist CTU w/FCO **job in progress** i [ 2/11/2010 CTU #9 1.75" (Interact Publishing) Job Scope. N2 FCO /Set Iso sleeve MIRU **'"** Job Continued on 2/12/10 WSR ***"" ° ~. a i 2/12/2010 CTU #9 1.75" (Interact Publishing) Job Scope: N2 FCO /Set Iso sleeve *'`*"" Job Continued from 2/11/10 WSR "'"*'`* MU BOT BHA #2 RIH drift to 4550' looked good PUH to 4200' park. Standby due to GC 2 upset and Rig move, blocking j ;.spine road. GC 2 ready to go MU tools RIH w/BHA #2 Job Continued on 2/13/10 2/12/2010iASRC Test unit #1, assist CTU w/FCO "*job in progress** 2/13/2010 ASRC Test unit #1, assist CTU w/FCO **job in progress** 2/13/2010~CTU #9 1.75" CT (Interact Publishing) Job Scope: FCO/Set ISO sleeve ***'"'' Continued from 2/12/10 ***** RIH w/ BHA #2 Start clean out beginning at 4600' with 50-75' bites and 5 bbl Geovis sweeps. Flowing to tanks due to GC plant upset. FCO in progress @ .5950'........... Job Continued on 2/14/10 WSR 2/14/2010~ASRC Test unit #1, assist CTU with FCO ""job in progress** 2/14/2010~CTU #9 9 Interact Publishing) ""`* Continued from 2/13/10 *'"'"" FCO to 6150' Start i logging from 6150' to 4200' POOH check logs for data.Confirmed good data showed FCO was in the main bore. MU Baker BHA #4 with Hipp Tripper and Isolation Sleeve for L5. Set Isolation sleeve in L5 (Nb) LEM Window @ 4640'. Get ASRC to POP well. MU/RIH w/ BHA # 6, w/ 2.2" PDS carrier and 2.25"JSN. ;Stop at 6100' log at 40 fpm to 4200' POOH get data confirm no fill and in mainbore hooked ~ood.~ Job continued on 2/15/10 WSR ........ 2/15/2010iCTU #9 FCO ***** Continued from 2/14/10 **"**** Confirmed no fill and also ;stayed in the mainbore with 2.20" PDS carrier logging tools. Standby for ASRC to gget well flowing. Well is flowing 2000 b/d oil, minimal wtr, trace of solids, 4.5 MM gas on 1.3 MM A/L gas. Well results are good, rig down coil. .Left well flowing to the plant, in test through ASRC test unit. ******Coil job is complete"***** 2/15/2010ASRC Test unit #1, 6 hour test, continue flow **job in progress** 2/16/2010~ASRC Test unit #1, complete 6 hour piggyback test, continue flow **job in progress** 2/16/2010~ASRC Test unit #1, 6 hour stand alone test **continue flow** f 2/16/2010~ASRC Test unit #1, 6 hour stand alone test, continue flow *"job in progress*" m ~~ = ~ ~ ~~~,.~ ~m ~...a 2/17/2010~ASRC Test unit #1, 6 hour stand alone test, rig down "`job in progress** 2/18/2010 ASRC Test unit #1, RDMO **job complete** FLUIDS PUMPED BBLS 86.5 60/40 METH 1205 KCL 163 GEO VIS 8270 GALLONS NOTROGEN 9724.5 TOTAL DATA SUBMITTAL COMPLIANCE REPORT 2/3/2010 Permit to Drill 2080570 Well Name/No. PRUDHOE BAY UN ORIN L-205L5 Operator BP EXPLORATION (ALASF(A) INC API No. 50-029-23388-63-00 MD 8630 TVD 4364 Completion Date 7/8/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / ASI Density / NEU /AIM / PWD Well Log Information: Log/ Electr Data Digital Dataset Log Log Run (data taken from Logs Portion of Master Well Data Maint Interval OH / T ~e nneairrmt numoer Name Scare meaia No Start Stop CH Received Comments D Asc~ Directional Survey 0 8630 Open 7/10/2008 pt Directional Survey 0 8630 Open 7/10/2008 D C Lis 16998~duction/Resistivity 239 8630 Open LIS Veri, GR, ROP, FET, RPX, RPS, RPM, DRHO, i NPHI og Induction/Resistivity 25 Blu 4652 8630 Open MD Vision Service g Induction/Resistivity 25 Blu 4652 8630 Open TVD Vision Service Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y /~ Chips Received? Y7N" Analysis YTI~- Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? "°' N Formation Tops ~ N Comments: DATA SUBMITTAL COMPLIANCE REPORT 2/3/2010 Permit to Drill 2080570 Well Name/No. PRUDHOE BAY UN GRIN L-205L5 Operator BP EXPLORATION (ALASKAN INC API No. 50-029-23388-63-00 MD 8630 TVD 4364 Completion Date 7/8/2008 Completion Status 1-OIL Current Status 1-OIL UIC N Compliance Reviewed By: Date: • ~~ ~ RE~I~IVEL~ ` ~ ~ STATE OF ALASKA . +~ ALASKA OIL AND GAS CONSERVATION COMMISSION O ~ T ~ 4 2008 WELL COMPLETION OR RECOMPLETION REPORT AI~ l) & ~, ' ~eviser~ = la O~/"8 ~.ht1~FKK1~~ a. is+S10f~ 1a. Well Status: ~ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended aoAACZS.~os aoAnczs.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Strati ra hic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/8!2008 12. Permit to Drill Number 208-057 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/30/2008 13. API Number 50-029-23388-63-00 4a. Location of Well (Governmental Section): Surface: 2361' FSL 3786' FEL 34 T12N R11E UM SEC 7. Date T.D. Reached 7/2/2008 14. Well Name and Number: L-2t}5L5 , , , , , . Top of Productive Horizon: 1224' FSL, 446' FEL, SEC. 33, T12N, I~11E, UM (Nb) ' ' 8. KB (ft above MSL): 76.1' Ground (ft MSL): 47.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion ~ ~N L `{ 4 RS EL Total Depth: 1 8 35 EC. 03, ~11N, R11E, UM 9. Plug Back Depth (MD+T1/D) 8630' 4364' Schrader Bluff 4b. Location of Well (St to Base Piane Coordinates, NAD 27) Surface: x- 583130 y- 5978082 Zone- ASP4 10. Total Depth (MD+TVD) 8630' 4364' 16. Property Designation: ADL 028241 TPI: x- 581206 y- 5976923 Zone- ASP4 Total Depth: x- 5819itr~~~ y- 59738 one- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No ub t r 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD / GR / RES / AZI Density / NEU /AIM / PWD . 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH 7VD HOLE AMOUNT WT. PER Fr GRADE TOP BOTTOM TOP'° BOTTOM SIZE CEMENTING RECORD ~- PULLED -1/ " L-80 36' 61 4 7 ' 114' -3 SI ' 4-1/2"` 2. 13Cr80 4604' 4813' 4056' 173' N/A Tieback Liner 23. Open to production or inject ion? ®Yes ^ No 24. TueING RECORn It Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 4612' 4542' MD TVD MD TVD 5481' - 6522' 4105' - 4108' 7061' - 8574' 4098' - 4113' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL. MD AMOUNT i~ KIND OF MATERIAL USED 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Data Of Test: I-IOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PfeSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? Q Yes ~ No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. ~, ;~,~€~ None ~. ~ Form 10-407 Revised 02/2007..,,, ~~ k~ •"~ ~ ~ ~ CONTINUED ON REVERSE SIDE ~~~I Tv ({L,J~ ~ 1' I~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS RKERS ENCOUNTERED: 29. FORMATION TESTS NAME D TVD Well Test ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Schrader Bluff NS 4650' 4087' None Schrader Bluff NC 4703' 4120' Schrader Bluff NE 4715' 4127' Schrader Bluff NF 4831' 4179' Schrader Bluff NF 5175' 4179' Schrader Bluff NE 5362' 4128' Schrader Bluff NC 5385' 4122' Schrader Bluff NB 7510' 4091' Schrader Bluff NB 7572' 4093' Formation at Total Depth (Name): Schrader Bluff NB (Enteredf~6ase) 5480' 4105' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ^- (J ~ p Signed Terrie Hubble Title Drilling Technologist Date ~ QC~ Q L-205L5 208-057 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Scott Kolstad, 564-5347 Permit No. / A royal No. INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 7, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ~~ Date 10-10-2008 Transmittal Number:93002 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. f you have any questions, please contact Joe Lastufka at (907)564-4091 Delivery Contents Well Completion or Recompletion Report -'`*Corrected'`* 10/7/2008 L-205L5 -Items 4A&B Changed PLEASE REPLACE ORIGINAL COMPLETION REPORT WITH THIS CORRECTED VERSION Please Sign and Return one copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center PhillipsConoco Exxon Exxon DNR Sandy Lemke File Room Scott Cooley Kristin Dirks Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 9951.9-6612 . - ~~ Date 10-10-2008 Transmittal Number:93002 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. I t you have any questions, please contact Joe Lastutka at (NU/)564-4UN1 IDeliverv Contents I Well Completion or Recompletion Report -""Corrected"" 10/7/2008 L-205L5 -Items 4A&B Changed PLEASE REPLACE ORIGINAL COMPLETION REPORT WITH THIS CORRECTED VERSION Please Sign and Return one copy of this transmittal. Thank You, Joe Lastufka Petrotechnical Data Center PhillipsConoco Exxon Exxon DNR Sandy Lemke File Room Scott Cooley Kristin Dirks Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 1.96612 Anchorage, AK 99519-6612 Page 1 of 1 ~ ~ Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Tuesday, October 07, 2008 1:21 PM To: Saltmarsh, Arthur C (DOA); Okland, Howard D (DOA) Subject: FW: Corrections: PBU L-205L5, PTD # 208-057 Oops... still made a typo. Sheeshl See the X coordinate below. Terrie From: Hubble, Terrie L Sent: Tuesday, October 07, 2008 11:40 AM To: 'Saltmarsh, Arthur C (DOA)'; 'Okland, Howard D (DOA)' Subject: Corrections: PBU L-205L5, PTD # 208-057 Hi Art and Howard, An error has been fiound on the Completion Report for this well. The bottom hole location is off a bit. Please make the following corrections: X should be: 58 1 976 Y should be: 5973873 At Total Depth: 1$35' FNL, 4995' FEL, Sec. 03, T11 N, R11 E, UM Thanks! Terrie 10/7/2008 • Saltmarsh, Arthur C (DOA) i u~a. i vl c., From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Thursday, October 02, 2008 11:51 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU L-205 / PTD # 208-053, etc. H i Art, Please reference the following wells {Multilateral Legs): Well Name: PBU L-205 PBU L-205L1 PBU L-205L2 PBU L-205L3 PBU L-205L4 PBU L-205L5 Permit #: 208-053 208-054 208-058 208-055 20$-056 208-057 APi #: 50-029-23388-00-00 50-029-23388-60-00 50-029-2338.8-64-00 50-029-23388-61-00 50-029-23388-62-00 50-029-23388-63-00 Top Perf MD: See 10-407's Bottom Perf MD: See 10-407's This well began Production on September 25, 2008 Method of Operations is: Gas Lift Date of Test: 09/30!08 Hours Tested: 4 24-Hour Rate /Oil-Bbl: 2,254 24-Hour Rate 1 Gas-Mcf: 3,553 24-Hour Rate /Water-Bbl: 12 Test Rate /Oil-Bbl: 376 Test Rate /Gas-Mcf: 592 Test Rate iWater-Bbl: 2 Choke Size: 53 Gas-Oil Ration: 1,576 10/2/2008 10.~'GG VlG Flow Tubing Pressure: 820 Casing Pressure: 1,260 Oil Gravity-API: Unavailable 10/2/2008 STATE OF ALASKA ~~ ALASKA~L AND GAS CONSERVATION COM~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~.m. ~- ~ - ~ ~ ~~l~s~ 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.,os zoAACZS.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class; °" ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 7/8/2008 12. Permit to Drill Number 208-057 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/30/2008 13. API Number 50-029-23388-63-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 7/2/2008 14. Well Name and Number: L-205L5 2361 FSL, 3786 FEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon: 1224' FSL, 446' FEL, SEC. 33, T12N, R11 E, UM (Nb) 8. KB (ft above MSL): 76.1' Ground (ft MSL): 47.6' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 1810' FNL, 5048' FEL, SEC. 03, T11 N, R11 E, UM 9. Plug Back Depth (MD+TVD) 8630' 4364' Schrader Bluff 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 583130 y- 5978082 Zone- ASP4 10. Total Depth (MD+TVD) 8630' 4364' 16. Property Designation: ADL 028241 _ TPI: x- 581206 y- 5976923 Zone- ASP4 Total Depth: x- 581923 y- 5973897 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 C 25.071): MWD / GR / RES / AZI Density / NEU /AIM / PWD y1//~yQj ~ ~6SLp;tJ,Q ~0~~7y0 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH 7V0 HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 4-1/2" 12.6# L-80 4636' 8618' 4078' 4114' 6-3/4" Uncemented Slotted Liner 4-112" 12.6# 13Cr80 4604' 4813' 4056' 4173' N/A Tieback Liner 23. Open to production or inject ion? ®Yes ^ No 24. TueING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 4612' 4542' MD TVD MD TVD 5481' - 6522' 4105' - 4108' 7061' - 8574' 4098' - 4113' 25.' ACID, FRACTURE, CEMENT .SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT St KIND OF MATERIAL USED 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. CO~IPLETdON None ~ AT ~. Form 10-407 Revised 02/2007 ~ 1 ~ ~ ~ ~ ~ ~NTINUED ON REVERSE SIDE - @ ~ ~~r ~ ~ ~oOO ~~~jG 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND ERS ENCOUNTERED): 29. FORMATION TESTS NAME M TVD WeIlTested. ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Schrader Bluff NB 4650' 4087' None Schrader Bluff NC 4703' 4120' Schrader Bluff NE 4715' 4127' Schrader Bluff NF 4831' 4179' Schrader Bluff NF 5175' 4179' Schrader Bluff NE 5362' 4128' Schrader Bluff NC 5385' 4122' Schrader Bluff NB 7510' 4091' Schrader Bluff NB 7572' 4093' Formation at Total Depth (Name): Schrader Bluff NB (Entered fl Base) 5480' 4105' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~ ~ p Signed Terrie Hubble Title Drilling Technologist Date QC~ Q L-205L5 208-057 Prepared eyName/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A rOVal NO. Drilling Engineer: Scott Ko/stad, 564-5347 INSTRUCTIONS GeNeraA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP Page 1 of 1 Leak-Off Test Summary Legal Name: L-205 Common Name: L-205 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 5/3/2007 LOT 3,026.0 (ft) 2,739.0 (ft) 9.25 (ppg) 975 (psi) 2,291 (psi) 16.10 (ppg) 6/3/2008 LOT 5,611.0 (ft) 4,465.0 (ft) 9.30 (ppg) 520 (psi) 2,677 (psi) 11.54 (ppg) • Printed: 7/23/2008 2:28:40 PM • BP Page 1 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/25/2008 06:00 - 10:30 4.50 MOB P PRE Release rig from L-2201 ~ 0600. Back pit module off of sub 10:30 - 00:00 I 13.50 MOB I P I I PRE 4/26/2008 100:00 - 07:00 I 7.001 MOB I P I I PRE 07:00 - 09:30 2.50 MOB P PRE 09:30 - 14:00 4.50 MOB P PRE 14:00 - 16:00 2.00 MOB P PRE 16:00 - 18:30 2.50 MOB P PRE 18:30 - 23:00 4.50 RIGU P PRE 23:00 - 00:00 1.00 RIGU P PRE 4/27/2008 00:00 - 03:00 3.00 RIGU P PRE 03:00 - 06:30 3.50 RIGU P PRE 06:30 - 07:30 1.00 RIGU P PRE 07:30 - 09:00 1.50 DRILL P SURF 09:00 - 10:00 1.00 DRILL P SURF 10:00 - 10:30 0.50 DRILL P SURF 10:30 - 11:00 0.50 DIVRTR P SURF 11:00 - 13:00 I 2.001 DRILL I P I I SURF 13:00 - 16:00 3.001 DRILL P SURF 16:00 - 17:30 1.50 DRILL P SURF 17:30 - 22:30 5.00 DRILL P SURF 22:30 - 00:00 I 1.501 DRILL I P SURF 00:00 - 12:00 I 12.001 DRILL I P I I SURF unit and to edge of pad. Back Sub unit off of well and and to edge of pad. Perform rig maintenence while standing by on pad prep to be completed for L-205. Pad leveled, Gas Lift Lines removed from neighboring wells, well houses removed as necessary. Spot line and install diverter on landing ring. Begin spotting rig mats around wellhead. Move and spot sub over well. Shim & level substructure. Set up Herculite berms around cellar and rig. Spot diverter lines into position and make up. Spot pit module into position. Spot Jumbo-Vac System and cuttings tank. Berm around pits. ACCEPT RIG -Rig accept rolled back to 25-Apr-2008 16:00 due to pad prep standby time and diverter installation. Take on water for spud mud. Load pipeshed w! 4" drillpipe and HWDP. Load bulk system and begin mixing spud mud. Continue loading shed w/ DP and strapping pipe. Continue mixing spud mud. Nipple up drilling riser. Finish preparing to PU drillpipe. PU 105 jts. 4" HT-40 drillpipe from pipeshed and rack back in derrick. Pressure test surface equipment to 3500 psi,good test. Pick up HWDP and stand back in derrick. -stage BHA components on pipeshed -bring stabilizers,bit,bit breaker, and UBHO sub to floor. Service top drive and install safety cable to link tilt hydraulic cylinder. Pick up stand w/jars,tag bottom at 70',rack back in derrick. Function test diverter system. Perform accumulator test. Witnessing of test waived by AOGCC rep Chuck Scheve. Witnessed by BP WSL Blair Neufeld & NAD TP Ronnie Dalton. Make up 13-1/2" bit to HWDP to drill out conductor and formation to accomodate BHA makeup. **Note: Langham Crew held Pre-Spud meeting during their Pre-Tour meeting. Drill 13 1/2" hole to 312' md. Break out bit and stand back HWDP. Pick up and make up 13.5" directional BHA #1. Bit - MXL-1 X, 1.50 deg PDM. Orient motor with MWD. Tag up on fill at 247', Wash down to 276' md. PJSM. Rig up Gyro Data and Sperry wireline unit. *'Note: Stewart Crew held Pre-Spud meeting during their Pre-Tour meeting. Drill 13.5" surface hole from 312' to 1301'. -Started kick-off ~ 300'. Gyro survey every stand to 1206'. -570 gpm, 1930 psi on, 1520 psi off. 80 rpm, 8k TO on, 5-7.Ok TO off. -PU - 78k, SO - 70k, RT - 72k, WOB - 35k. -Cuttings load normal,gravel,sand and clays, no downhole losses. Printed: 8/6/2008 12:18:26 PM ! • g p Page 2 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES II Rig Number: Date From - To Hours Task I Code NPT Phase Description of Operations 14/28/2008 00:00 - 12:00 12.00 DRILL P 12:00 - 16:30 4.50 DRILL P 16:30 - 17:30 1.00 DRILL P 17:30 - 18:30 1.00 DRILL P 18:30 - 20:15 1.75 DRILL P 20:15 - 00:00 I 3.751 DRILL P 14/29/2008 100:00 - 05:30 I 5.50 DRILL I P 05:30 - 06:45 I 1.25 I DRILL I P 06:45 - 07:30 ~ 0.75 ~ DRILL I P 07:30 - 08:30 1.00 DRILL P 08:30 - 09:45 1.25 DRILL P 09:45 - 10:30 0.75 DRILL P 10:30 - 12:30 2.00 DRILL P 12:30 - 15:00 2.50 DRILL P 15:00 - 17:30 2.50 DRILL P 17:30 - 19:30 2.00 DRILL P 19:30 - 22:30 3.00 CASE P 22:30 - 00:00 1.50 CASE P 00:00 - 09:30 9.50 CASE P SURF -vis 400+, mud weight in 9.2 ppg,mud weight out 9.4 ppg SURF Directionally drill 13 1/2" surface hole from 1,301' to 1,680' md. 560 gpm, 1,930 psi on, 1,520 psi off. 80 rpm, 8.Ok tq on, 2.1 k tq off. PU - 78k, SO - 70k, RWT - 72k, WOB - 5-35k. SURF Circulate bottoms up X 3 ~ 600 gpm, 1,758 psi, 100 rpm. 9.1 ppg MW SURF W iper trip from 1,680' to 256'. Pulled OK until 35k over from 1,050 -1,000 & 835'. No other overpulls. SURF Run in hole from 256' to 1,680'. Work pipe down without pumps from 980 - 1,050' md. Slackoffs of up to 30k, but able to fall past slowly. SURF Directionally drill 13 1/2" surface hole from 1,680'to 2,061' md. 575 gpm, 2,010 psi on, 1,823 psi off. 80 rpm, 6-7k tq on, 3k tq off. PU - 85k, SO - 75k, RWT - 75k, WOB - 25-30k. AST - 8.72 hrs, ART - 2.57 hrs SURF Directionally drill 13 1/2" surface hole from 2,061' - TD ~ 3,036' md. 700 gpm, 3,025 psi on, 2,800 psi off. 80 rpm, 7k TO on, 4k TO off PU - 108k, SO - 80k, RWT - 85k, WOB - 35k Hydrates breaking out at surface while drilling 2,000' - 2,200' and before tapering off. AST - 0.55 hrs, ART - 2.97 hrs SURF Rotate and reciprocate full stand while circlulating to clean up hole CBU x 3. 710 gpm, 3040 psi, 100 rpm, 4k TO. Shakers cleaned up to only minor cuttings returns after 2.5 bottoms up. Shut down, monitor well -Static w/ occasional hydrates breaking out. SURF Lay down single joint & POH 3 stands from 3,036' and to 2,707' md. Encounter 35k+ overpull with slight swabbing. PU - 115k, SO 75k. SURF Backream 8 stands out of hole to 1,946' and (just below base permafrost ~ 80 rpm, 235 gpm, 2565 psi, RTW - 80k. SURF Attempt to pull one stand dry at 1,946' but well swabbing. Continue backreaming to 922' md. SURF RIH from 922' to TD ~ 3,036' md. Tag up TD on depth w/ no fill. PU - 110k, SO - 85k. No tight spots seen. SURF CBU x 2.5 ~ TD, reciprocating pipe full stand. 700 gpm, 3100 psi, 100 rpm, 4.Ok TO, RTW - 92k SURF Shut down, monitor well -static. MW in 9.5, MW out 9.5. Pull out of hole with 13.5" drilling BHA #1 from 3,036' to 1,004' md. Pulled 20k over at 1,870' and and 30k over at 1,315'. Otherwise, no more than 5-7k overpulls. SURF PJSM. Lay down BHA #1. Stand back JAR stand. Bit grade: 1-1-SS-C-F-I-NO-TD. SURF Clean and clear rig floor of BHA equipment. SURF PJSM. Make dummy run with 103/4" casing hanger and landing joint. Rig up to run casing. SURF PJSM. Pick up and make up 10 3/4" 80' shoe track. Baker-Lok connections. Check floats - OK. SURF Check floats - OK. Continue running in hole with 10 3/4" 45.5# rnnteo: tuwzuuts tz:tts:~o rnn BP Operations-Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: ORIG DRILLING Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date .From- To Hours Task Code NPT 4/30/2008 00:00 - 09:30 9.50 CASE P Start: 4/25/2008 Rig Release: 7/8/2008 Rig Number: Page 3 of 18 Spud Date: 4/27/2008 End: 5/21 /2008 Phase Description of Operations SURF L-80 BTC casing to -3026' md. Filled every joint with casing fill-up tool topping off every 10 joints. Make up TO - 9,500 ffnbs. Used BOL 2000 NM pipe lubricant. Circulate down every 5 or 10 joints as needed ~ 3 bpm, 470 psi to keep displacement good. Halliburton 10 3/4" Float Shoe Bottom ~ 3026'. 2 Jts 10 3/4" 45.5# L-80 BTC Casing (#1- #2) Halliburton 10 3/4" Float Collar ~ 2941'. 2 Jts 103/4" 45.5# L-80 BTC Casing (#3- #4) 69 Jts 10 3/4" 45.5# L-80 BTC Casing (#5- #73) 103/4" 45.5# Hanger Pup Jt Casing hanger 103/4" Landing Ring to Rotary table - 28.85' Up weight = 160K, Down Weight = 110 Baker-Lock Shoe-track Jts #1-3 Bowsprings Centralizers: 1 on stop ring 5-10 ft. above shoe on jt #1 1 on stop ring 5-10 ft. above float collar 23 on collars on jts #3-25 25 Total Centralizers, 2 Stop Rings 09:30 - 10:30 1.00 CASE P SURF Laydown Frank's tool. Slowdown topdrive. Make up double plug cementing head. 10:30 - 12:30 2.00 CEMT P SURF Stage pumps up to 300 gpm, 406 psi ICP incrementally. Continue circulating and conditioning mud to a 60 viscosity and 18 YP ~ 300 gpm, 305 psi prior to switching to Dowell. Reciprocated casing 12 ft strokes. PU - 175k, SO - 119k. Held cementing PJSM while circulating. 12:30 - 14:30 2.00 CEMT P SURF Switch over to Dowell. Pump 5 bbls of water. Pressure test lines to 4,000 psi - OK. Pump 80 bbls of 10.0 ppg of MudPush II ~ 6.5 bpm, 180 psi ICP, 165 psi, FCP. Shut down and release bottom plug. Pump 468 bbls of 10.7 ppg DeepCrete lead cement ~ 6.5 bpm, 306 psi ICP, 336 psi FCP. Pump 83 bbls of 15.8 ppg Class "G" tail cement ~ 5.5 bpm, 485 psi ICP, 280 psi FCP. *Note: Spacer observed at surface with 16 bbls tail cement pumped. Drop top plug and chase with 5 bbls H2O. Full returns throughout cement pumping. 14:30 - 15:30 1.00 CEMT P SURF Switch over to rig pumps and displace cement with total of 278 bbls 8.6 ppg seawater ~ 5 bpm, 112 psi ICP, 804 psi FCP. Reciprocated pipe in 15' strokes until 175 bbls into displacement. Landed casing on ring due to low slack off weight. PU - 180k, SO - 75k prior to landing casing. Slow pump to 3 bpm 10 bbls prior to bumping plug, 695 psi ICP, 750 psi FCP. Bumped plug ~ 3,918 strokes (96.6% efc) with 3,500 psi. CIP ~ 15:31 hr. Returned 172 bbls of "Sidewalk Cement". Full returns throughout job. 15:30 - 16:00 0.50 CEMT P SURF Pressure up to 3500 psi for casing test. After 20 minutes, pressure bled down to 3,185 psi. Shut in and isolate any possible surface equipment. Pump 0.26 bbl to repressure to 3500 psi. Bled down 116 psi in 7 minutes. Bleed off pressure and check floats. Printed: 8/6/2008 12:18:26 PM BP Page 4 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations I 4/30/2008 16:00 - 19:30 3.50 CASE P SURF Laydown landing joint. Flush flowline and riser. Rig down casing and cementing equipment. Start nipple down of diverter lines. Clean out from under rotary table. 19:30 - 23:00 3.50 WHSUR P SURF Nipple down diverter riser and change out drilling nipple adapter from 20" to 16". Move surface hydril off of conductor and chain up in cellar. 23:00 - 00:00 1.00 WHSUR P SURF Bring casing head and tubing spool into cellar and nipple up same. Test metal to metal seals to 1,000 psi - 10 min - OK. 5/1/2008 00:00 - 04:30 4.50 BOPSU P SURF Nipple up BOPE. 04:30 - 13:30 9.00 CEMT P SURF Continue to clean pits in preparation for MOBM. clean cement out of flowline. Clear out from under drawworks. Load pippe shed w/ DP and strap same. 13:30 - 15:00 1.50 BOPSU P SURF Rig up to test BOPE. Install test plug w/ 4" test joint. 15:00 - 22:00 7.00 BOPSU P SURF Pressure test BOPE to 250 psV3,500 psi for 5 min each test. 250 psi/2,500 psi on annular preventer for 5 min each. Perform Accumulator test. Test witnessed by BP WSLs M. Martyn, J. ~i LeBlanc, & NAD TPs R. Dalton, G. Hoffman. AOGCC rep. ~~ John Crisp waived witness of test. 22:00 - 23:00 1.00 BOPSU P SURF RD from BOP testing. LD test joint. Install 9.9" ID wear ', bushing. 23:00 - 00:00 1.00 CASE P SURF Close blinds and pressure up on 10-3/4" casing for pressure test. Held 2000 psi for 5 minutes before bringing pressure up to 3500 psi. Good test. Only lost 30 psi during test. '5/2/2008 00:00 - 01:00 1.00 DRILL P INT1 MU BHA #2 - 9-7/8" MXL-1X milltooth bit, NB Stab, DC, Stab, tea DC, Jars. 01:00 - 02:30 1.50 DRILL P INT1 RIH on drillpipe to 2,728' md. ~! 02:30 - 03:00 0.50 DRILL P INTi Transfer remaining stands from off drillers side rack into drillers i side rack to enable access to steam table for cleaning. ~ 03:00 - 03:15 0.25 DRILL P INT1 Wash down and tag up on top of cement ~ 2,919' md. Slack off 10k to confirm. ~ 03:15 - 03:45 0.50 DRILL P INT1 CBU x 1.5 to flush wellbore. 718 gpm, 2090 psi. 03:45 - 04:30 0.75 DRILL P INT1 Clean out from under off-driller side pipe rack. 04:30 - 06:00 1.50 DRILL P INT1 Cut and slip drilling line. Service topdrive and crown. 06:00 - 09:00 3.00 DRILL N WAIT INT1 Mud planned for 9ES was sent to Doyon 15 due to a well control incident, wait on mud from mud plant. 09:00 - 13:30 4.50 DRILL N WAIT INT1 Waiting on mud from mud plant to arrive. Truck with mud broke down enroute. 13:30 - 15:30 2.00 DRILL P INT1 Take on MOBM into rig pit system. Pump 50 bbls used Versapro LS viscosified OBM spacer. Chase with new 9.3 ppg. MOBM ~ 7 BPM with 580 PSI. 15:30 - 16:15 0.75 DRILL P INT1 Drill cement from cement top at 2,922' through float collar and shoe found on depth at 2,940' & 3,026' and clean out rathole to 3,036' md. 450 gpm, 1360 psi, 80 rpm, 3-4k TO on, 25-30k WOB. 16:15 - 17:30 1.25 DRILL P INT1 CBU x 2.5 while rotating and reciprocating. 140 rpm, 690 gpm, 2800 psi, 2k TQ off, PU - 95k, SO - 80k, RTW - 87k. 17:30 - 19:00 1.50 DRILL P INT1 Shut down monitor well -static. MW in 9.3 ppg, MW out 9.3 ppg. POH from 3,036' to top of BHA ®208' 19:00 - 20:15 1.25 DRILL P INT1 Lay down or rack back BHA #2 components as appropriate. Bit grade 0 - 0 - WT - A - E - I - NO -BHA. (Still had paint on it) 20:15 - 21:30 1.25 DRILL P INT1 PJSM w/ rig hands and coring personel. Perform practice run with core barrel handling joint. Lay down empty handling joint g p Page 5 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task `Code NPT Phase Description of Operations 15/2/2008 20:15 - 21:30 1 1.25 ~ DRILL P INT1 21:30 - 00:00 I 2.501 DRILL I P I INT1 15/3/2008 100:00 - 00:30 0.501 DRILL I P INT1 00:30 - 01:30 1.00 DRILL P INTi 01:30 - 02:00 0.50 DRILL P INTi 02:00 - 04:30 2.50 DRILL P INT1 04:30 - 05:00 0.50 DRILL P INTi 05:00 - 05:30 I 0.501 DRILL I P I I INT1 05:30 - 06:00 0.50 DRILL P INT1 06:00 - 06:30 0.50 DRILL P INTi 06:30 - 11:45 I 5.251 DRILL I P I I INT1 11:45 - 12:30 0.75 DRILL P INT1 12:30 - 12:45 0.25 DRILL P INTi 12:45 - 15:00 2.25 DRILL P INT1 15:00 - 17:00 2.00 DRILL P INT1 17:00 - 20:00 3.00 DRILL P INT1 20:00 - 21:30 1.50 DRILL P INT1 21:30 - 00:00 2.50 DRILL P INT1 5/4/2008 00:00 - 02:00 2.00 DRILL P INT1 02:00 - 08:00 6.00 DRILL P INT1 08:00 - 09:00 1.00 DRILL P INT1 09:00 - 12:00 3.00 DRILL P INT1 to pipeshed 4 times while adjusting operations to ensure smooth handling from rig floor to pipe shed. Practice went well, ready for game time. Begin making up BHA #3 - 8-1/2" MXL-1X milltooth bit, Powerdrive Rotary Steerable, ARC, MWD, NM-DC, NM Stab, tea NM DC. Finish making up BHA #3 - 8-1/2" MXL-1X milltooth bit, Powerdrive Rotary Steerable, ARC, MWD, NM-DC, NM Stab, tea NM DC, CCV, Jars. Test powerdrive RSS - OK. RIH w/ BHA #3 to 1,031. Install ghost reamer. Shallow test MWD - 500 gpm, 1442 psi. RIH on 4" HT-40 DP 1x1 from pipeshed to 3,030' md. Perform ECD Baseline test 504 gpm, 2180 psi - ~ 0 rpm, CECD = 9.45, AECD = 9.54, correction factor -0.09, ~ 120 rpm CECD = 9.45, AECD = 9.56, correction factor = -0.11 Directionally drill 20' of new hole to 3,056' md. 501 gpm, 2,147 psi on, 2,098 psi off. 133 rpm, 3.8k tq on, 2.9k tq off. PU - 104k, SO - 88k, RWT - 75k, WOB - 10k. CBU while rotating 135 rpm, & reciprocating 30'. 498 gpm, 2114 psi, 3.Ok TO. Pull back to casing shoe at 3,026' and and perform LOT to 16.10 ppg. Leakoff pressure = 975 psi, mud weight 9.25 ppg, TVD - 2,739'. Directionally drill 8.5" hole from 3,056' and to 3,287' md. 510 gpm, 2,170 psi on, 2,200 psi off. 140 rpm, 3.5k tq on, 3.Ok tq off. PU - 105k, SO - 83k, RWT - 95k, WOB - 5-10k. CECD - 9.35 ppg, AECD - 9.56 ppg, ART - 4.1 hrs CBU not rotating but reciprocating 80'. 445 gpm, 1555 psi. PU - 105k, SO - 85k. Monitor well -static. MW in = 9.3 ppg, MW out = 9.3 ppg, Pump dry job. Not achieving necessary doglegs. POH for BHA from 3,270' to 257' md. LD 8-1/2" Rotary Steerable BHA #3. Bit grade 0 - 0 - NO - A - E-I-NO-BHA. Make up BHA #4 - 9-7/8" MXL-1X RR milltooth bit, 1.5 deg PDM, ARC, MWD, NM-DC, NM Stab, tea NM DC, 8.5" reamer, CCV, Jars. RIH w/ BHA #4 to 1,032'. Install 9.875" ghost reamer. Shallow test MWD - 500 gpm, 1277 psi. Continue RIH w/ BHA #4 to 3,025' md. Establish parameters. Ream down in 8.5" open hole from 3,036' to 3,287' md. 2-7k WOB, 540 gpm, 2349 psi, 60 rpm, 3.7k TO. Directionally drill 9.875" hole from 3,287' and to 3,709' md. 550 gpm, 2,391 psi on, 2,280 psi off. 60 rpm, 3-5k tq on, 3-4k tq off. PU - 110k, SO - 90k, RWT - 100k, WOB - 3-20k. Ream last stand at 60 rpm & 3.5-5k TO to work out high dogleg. Worked down to 7.93 deg/100. Directionally drill 9.875" hole from 3,541' to 3,891' md. 600 gpm, 2,860 psi on, 2,770 psi off. Printed: 8/6/2008 12:18:26 PM gp Page 6 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/4/2008 09:00 - 12:00 3.00 DRILL P INT1 60 rpm, 4-6k tq on, 4k tq off. PU - 120k, SO - 95k, RWT - 105k, WOB - 5-20k. CECD - 9.28ppg, AECD - 9.47ppg 10:30 -Started taking -7bph losses ~ -3,800' which slowly healed up and stopped by 15:00. 24 bbls lost total. 12:00 - 00:00 12.00 DRILL P INT1 Directionally drill 9.875" hole from 3,891' to 4,340' md. 650 gpm, 3,418 psi on, 3,240 psi off. 60 rpm, 5-6k tq on, 5k tq off. PU - 130k, SO - 95k, RWT - 110k, WOB - 10-20k. CECD - 9.21 ppg, AECD - 9.61 ppg Ream stands as necessary to reduce high doglegs if encountered. AST - 7.72 hrs, ART - 2.22 hrs 5/5/2008 00:00 - 01:00 1.00 DRILL P INT1 CBU x 2.5 ~ 650 gpm, 3,360 psi, 60 rpm, 5.5k TO. 01:00 - 04:00 3.00 DRILL P INT1 Shut down, monitor well -static. MW in 9.1, MW out 9.1, Pull 1 stand w/o overpull. Pump dry job. POH from TD ~ 4,430' and to top of BHA ~ 295' md. No more than 5k overpulls on trip out. 04:00 - 08:00 4.00 DRILL P INTt Lay down BHA #4 - LWD tools need to be laid down to shed for re-programming while breaking apart lower BHA. Bit grade - 1 -3-WT-A-E-1 -FC-BHA. 08:00 - 09:30 1.50 DRILL P INT1 MU 8.5" BHA #5 - 8.5" MXL-iX, Powerdrive Rotary Steerable, ARC6, MWD. 09:30 - 12:00 2.50 DRILL N DFAL INT1 Attempt to function test rotary steerable. Unable. Lay down powerdrive & ARC and change out to backup tools. 12:00 - 13:30 1.50 DRILL P INT1 Function test new Powerdrive and ARC - OK. MU remaining BHA - NM Stab, tea DC, 8.5" Reamer, NM DC, Jars, 9.875" reamer. 13:30 - 16:30 3.00 DRILL P INT1 RIH w/ BHA #5 to 4,340. Wash down last stand to bottom & Tag upon depth - no fill. 16:30 - 17:30 1.00 DRILL P INT1 Directionally drill 8.5" hole from 4,340' to 4,360' md. 500 gpm, 2,781 psi on, 2,683 psi off. 120 rpm, 4k tq on, 3k tq off. PU - 135k, SO - 95k, RWT - 115k. CECD - 9.28 ppg, AECD - 9.47 ppg 17:30 - 18:30 1.00 DRILL P INT1 Shut down pump 2. Pulsation dampener leak into pump room. Troubleshoot & isolate pump 2 dampener. 18:30 - 19:30 1.00 DRILL P INT1 Directionally drill 8.5" hole from 4,360' to 4,420' md. 500 gpm, 2,781 psi on, 2,683 psi off. 120 rpm, 4k tq on, 3k tq off. PU - 135k, SO - 95k, RWT - 115k. CECD - 9.28 ppg, AECD - 9.47 ppg 19:30 - 20:30 1.00 DRILL P INT1 Take on 10.7ppg VersaCore mud to pits in preparation for mud swap. 20:30 - 21:30 1.00 DRILL P INT1 Displace over from to 10.7 ppg VersaCore mud. Pump DP volume at 400 gpm and reduce rate to 250 gpm while mud moving up annulus to minimize ECD's on formation. 21:30 - 22:30 1.00 DRILL P INTi Stage up pumps in 1 BPM increments from 3 BPM watching for losses. Only slight losses below 6 BPM and increasing to nearly 40 bph while pumping at drilling rate of 450 gpm. 22:30 - 00:00 1.50 DRILL P INTt Directionally drill 8.5" hole from 4,420' to 4,460' md. 420 gpm, 2,273 psi on, 2,100 psi off. 120 rpm, 3-4k tq on, 3k tq off. rnrnea: awzwa ~c.ia:m rm BP Operations Surnrnary-Repor# Legal Well Name: L-205 Common Well Name: L-205 Event Name: ORIG DRILLING Start: 4/25/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Page 7 of 18 ~ Spud Date: 4/27/2008 End: 5/21 /2008 Date From - To Hours j Task Code NPT Phase Description of Operations 15/5/2008 122:30 - 00:00 I 1.501 DRILL I P I I INT1 5/6/2008 00:00 - 00:30 0.50 DRILL P INT1 00:30 - 01:30 1.00 DRILL P INT1 01:30 - 02:00 0.50 DRILL P INT1 02:00 - 05:00 3.00 DRILL P INT1 05:00 - 07:30 2.50 DRILL P INT1 07:30 - 09:00 1.50 DRILL P INT1 09:00 - 10:30 1.50 EVAL P INT1 10:30 - 15:00 4.50 EVAL P INT1 15:00 - 16:30 1.50 EVAL P INT1 16:30 - 19:00 2.50 EVAL N WAIT INT1 19:00 - 20:30 1.50 EVAL P INT1 20:30 - 22:15 1.75 EVAL P INT7 22:15 - 23:00 0.75 EVAL P INT1 23:00 - 23:30 0.50 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INT1 5/7/2008 00:00 - 01:30 1.50 EVAL P INT1 01:30 - 02:00 I 0.501 EVAL I P I I INT1 02:00 - 12:30 ~ 10.501 EVAL P INT1 12:30 - 14:30 2.00 EVAL P INT1 14:30 - 17:30 3.00 EVAL P INTi PU - 135k, SO - 95k, RWT - 115k. CECD - 10.54 ppg, AECD - 10.78 ppg Losses slacked off to 3-4 bph after getting drilled solids into wellbore. Directional) Drill 8.5" hole from 4,460' to 4,475' and pausing to look at logs as required. Circulate bottoms up ~ 380 gpm. Only lost 3 bbls to formation while circulating. Shut down, monitor well -static. MW in 10.5, MW out - 10.5. Attempt to POH dry. Pulled 20k over and swabbing. Backream 2 stands out of hole to 4,340' and (9-7/8" hole). Pulling dry after that. only 5k overpulls. LD BHA #5 racking back collar stand and jar stand. Bit grade - 0-0-NO-A-E-I-NO-BHA. Clean and clear rig floor of all BHA components and handling tools. PJSM w/ Baker hands and all rig hands. Prepare tools for MU Baker M-Sand coring BHA. MU Baker coring BHA -Coring Bit, Stabalizer, 30' core barrel, Stabalizer, 30' core barrel, Stabalizer, Float Sub, Circ Sub, 4 stands 4" HWDP, Jars, 4 stands 4" HWDP. RIH w/ M-Sand coring BHA to 3,000' Circulate and condition mud w/ BHA inside casing shoe while coordinating transportation for coring personel due to inclement weather conditions. Service top drive. RIH from casing shoe to 4,424' on stands of DP. MU last stand and precautionary wash to bottom 125 gpm, 15 rpm. RTW - 100k. Tag up ~ 4,474.6' md. Stand back last stand. Insert 2 ea spaceout DP pups - 4.87' & 14.97' and single joint. PU - 115k, SO - 90k Drop ball, circulate down, and begin coring operations. Core from 4,475' to 4,496' md. 180 gpm, 907 psi, 60 rpm, 3.7k TO. Continue coring operations. Core from 4,496' - 4,503' md. 180 gpm, 907 psi, 60 rpm, 3.7k TO. at 4,503' md, torque dropped off to -2.7k and ROP stopped. Gradually increase weight on bit from 5k up to as much as 15k. No torque response. Drop ball and pump down to shear core. Pull gradually up to 80k over in first 20' off of bottom before weight broke back over. Pull 30k over ~ 4,430 & 40k over at 4,410'. Take slow pump rates & Begin POH following pulling schedule. POH w/ M-Sand coring BHA from 4,506' to 2,335' md. 3-minutes per stand from TD to 3,763', 6-minutes per stand from 3,763' to 2,622', 9-minutes per stand from 2,622' to 1,577'. 12-minutes per stand from 1,577' to 538'. 15-minutes per stand from 538' to 75' and - (Top of BHA)'. No overpulls while POH. Break out top portions of coring BHA, break out bit and remove split ring. MU bit & RIH to top sub. Set slips & dog collar. Remove inner core barrel and lay down to pipeshed in core shuttle. MU new core barrel assembly and install into coring Printed: 8/6/2008 12:18:26 PM BP Page 8 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: ORIG DRILLING iContractor Name: NABOBS ALASKA DRILLING I '~ Rig Name: NABOBS 9ES Date From-To Hours .Task Code NPT Spud Date: 4/27/2008 Start: 4/25/2008 End: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Phase Description of Operations 5/7/2008 14:30 - 17:30 3.00 EVAL P I NT1 BHA. Make up remainder of coring BHA. 17:30 - 19:30 2.00 EVAL P I NT1 RIH w/ M-Sand coring assembly number 2 from top BHA to 2,995' inside casing shoe. 19:30 - 20:30 1.00 EVAL P I NT1 CBU -stage up pumps tp 130 gpm. ICP 410 psi, FCP 380 psi. 20:30 - 21:45 1.25 EVAL P I NT1 RIH to 4,425' and w/ M-Sand BHA #2 21:45 - 22:15 0.50 EVAL P I NTi Start taking weight ~ -4,425' md. MU blower hose and screw into pipe. Take parameters. Pumps off PU - 115k, SO - 80k. Pumps on PU - 110k, SO - 90k, RTW - 100k. 22:15 - 23:00 0.75 EVAL P I NT1 Wash down 200 gpm, 730 psi, 20 rpm, 3k TQ. Saw Torque increase 500-1000 ft-Ibs ~ -4,410' and and stay there until -4,440' md. Tag up on depth ~ 4,503' md. 23:00 - 23:30 0.50 EVAL P I NT1 Lay down single joint, MU 'kelly stand'. 23:30 - 00:00 0.50 EVAL P I NT1 Wash down and begin coring operations. Core from 4,503' and to 4,514' md. 200 gpm, 1000 psi on, 750 psi off 50 rpm, 3.8k TO on, 3.Ok TQ off PU - 110k, SO - 90k, RTW - 100k, WOB - 0-5k 5/8/2008 00:00 - 00:45 0.75 EVAL P I NT1 Continue coring operations. Core from 4,514' and to 4,535' md. 200 gpm, 1000 psi on, 750 psi off 50 rpm, 3.8-4.3k TO on, 3.Ok TO off PU - 110k, SO - 90k, RTW - 100k, WOB - 0-5k 00:45 - 01:00 0.25 EVAL P I NT1 Drop ball from drop ball sub, pump down ~ 200 gpm. Pressure went to 1300 psi after landed. PU to first tool joint, break and drop dart for circ sub. Pressure fell off from 1320 psi to 580 psi ~ 200 gpm. 01:00 - 02:00 1.00 EVAL P I NT1 Circulate bottoms up through circ sub ~ 400 gpm, 1830 psi. No losses during circulation after pumps up to speed. Pump dry job. Blow down topdrive. 02:00 - 03:00 1.00 EVAL P I NT1 POH to 4,473' md. PU - 125k. Pull tight ~ 4,473' and bit depth - 4,405' and top stabalizer depth. Pull 40k over and pipe moving slowly. Work pipe slowly up to 4,412' bit depth before getting back to normal upweight of 120k. 03:00 - 07:30 4.50 EVAL P I NT1 POH w/ M-Sand coring BHA #2 from 4,412' to 538' md. 1.5-minutes per stand from TD to 2,812', 3-minutes per stand from 2,812' to 816', i, 6-minutes per stand from 816' to 259'. ', 12-minutes per stand from 259' to 16T. 24-minutes per stand from 167' -surface. No other overpulls while POH. 07:30 - 10:00 2.50 EVAL P I NT1 Break out top portions of coring BHA, break out bit and remove split ring. MU bit & RIH to top sub. Set slips & dog collar. Remove inner core barrel and lay down to pipeshed in core shuttle. 10:00 - 13:30 3.50 EVAL P I NT1 Install new core barrells into coring BHA in preparation for Core run #3 and rack back in derrick. 13:30 - 16:00 2.50 EVAL P I NT1 MU hole opening BHA - 8.5" millltooth bit, NB Stab, 8.5" ghost reamer, tea NM DC, 9.875" ghost reamer, CCV, Jars. 16:00 - 18:45 2.75 EVAL P I NT1 RIH dry with BHA to 4,341' md. 19:30 - 20:30 1.00 EVAL P I NT1 Taking 5 - 10k weight ~ 4,341' md. Screw in and ream down from 4,341' - 4,414' md. Tag top of 8.5" hole with 9.875" reamer when bit ~ 4,414' Ream down from 4,414' - 4,426' and d~ -15fph BOP. PU - 110k, SO - 80k, RTW - 102k. ~ ~ BP Page 9 of 18 ~ Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT ~ Phase Description of Operations 15/8/2008 19:30 - 20:30 1.00 EVAL P 20:30 - 21:30 1.00 EVAL P 15/9/2008 5/10/2008 21:30 - 00:00 2.50 EVAL P 00:00 - 01:30 1.50 EVAL P 01:30 - 02:30 1.00 EVAL P 02:30 - 04:00 1.50 EVAL P 04:00 - 05:30 1.50 EVAL P 05:30 - 06:00 0.50 EVAL P 06:00 - 07:00 1.00 EVAL P 07:00 - 07:30 0.50 EVAL P 07:30 - 08:30 1.00 EVAL P 08:30 - 09:00 I 0.50 I EVAL I P INT1 INT1 INT1 INT1 INTi INT1 INT1 INT1 INT1 INT1 INT1 INT1 09:00 - 12:30 3.50 EVAL P INT1 12:30 - 14:00 1.50 EVAL P INT1 14:00 - 15:00 1.00 EVAL P INT1 15:00 - 16:00 1.00 EVAL P INT1 16:00 - 16:30 0.50 EVAL P INT1 16:30 - 17:30 1.00 EVAL P INT1 17:30 - 18:00 0.50 EVAL P INT1 18:00 - 19:30 I 1.501 EVAL I P I INT1 19:30 - 20:30 1.00 EVAL P INT1 20:30 - 21:00 0.50 EVAL P INT1 21:00 - 22:30 1.50 EVAL P INT1 22:30 - 00:00 1.50 EVAL P INT1 00:00 - 00:30 0.50 EVAL P INT1 00:30 - 03:00 2.50 EVAL P INT1 03:00 - 04:00 1.00 EVAL P INT1 04:00 - 05:00 1.00 EVAL P INTi 05:00 - 06:00 1.00 EVAL P INT1 320 gpm, 1300 psi, 120 rpm, 3.6k TO off, 2-12k TO on. Torque fell off and went to 3.7k while increasing bit weight without further gain in ROP. Pick up off bottom, circulate and reciprocate. Consult with town engineer. Decide to trip for hole opener. POH with BHA from 4,414' to 1,462' md. POH w/ cleanout BHA to 140' md. LD 9-7/8" ghost reamer & 8-1/2" bit BHA. BHA in gauge. MU hole opener BHA - 9-7/8" bull nose hole opener, NB Stab, tea NM DC, RIH w/ BHA #9 to 3,035' md. Circulate 100 bbls to roll mud. Stage pumps up to 406 gpm, 1520 psi. Run in hole with 9 7/8" hole opener assembly from 3035' to 4253'. Break circulation & wash from 4253' to 4355',300 GPM ~ 1080 psi. Open hole from 8 1/2" to 9 7/8", 4355' to 4455'. -570 GPM X3340 psi -Torque off bottom 3k on bottom 4-6k -Up wt. 110k,down wt 85k, rotating wt 105k -Mud wt. in and out 106 ppg Circulate 1/2 bottoms up strokes 570 GPM ~ 3250 psi. -Rack back stand and record slow pump rates. -Monitor well,static. POOH from 4427'to surface, Mud wt in and out 10.6 ppg. Lay down hole opener and make up 8 1/2" bit. -Run in hole to 3015' Cut and slip 104' of drilling line. Service top drive -Grease & inspect drawworks. -Service Crown. Stage pumps up to 600 GPM ~ 2600 psi to shear mud in hole. -Circulate 160 bbls. Run in hole from 3015' to 4467'. Wash to bottom from 4467' to 4535'. -385 GPM X1780 psi -Final -40' required rotary to wash down. Pull back into 9 7/8" hole and circulate bottoms up. -425 GPM ~ 1970 psi. Monitor well,static Mud wt in and out 10.7 ppg. POH from 4437' to 2920'. Hole taking correct displacement. Pump dry job and blow down surface equipment. POH from 2920' to 919'. Hole taking correct displacement.. Rack back BHA. Clean rig floor after pulling out of hole. Run in hole with Core assembly #3 to 3303'. Circulate bottoms up at shoe, 200 GPM ~ 575 psi Run in hole from 3303' to 4400'. Break circulation,wash to bottom. -Pull back and rack back stand. -Drop ball Printed: 8/6/2008 12:18:26 PM ~ ~ BP Page 10 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/10/2008 ~ 05:00 - 06:00 ~ 1.00 EVAL ~ P INT1 06:00 - 08:00 I 2.00 EVAL I P I INT1 08:00 - 19:00 ~ 11.00 EVAL ~ P ~ INT1 19:00 - 19:30 0.50 EVAL P INT1 19:30 - 22:30 3.00 EVAL P INT1 22:30 - 23:00 0.50 EVAL P INT1 23:00 - 00:00 1.00 EVAL P INT1 5/11/2008 00:00 - 02:00 2.00 EVAL P INT1 02:00 - 03:00 1.00 EVAL P INT1 03:00 - 05:00 2.00 EVAL P INT1 05:00 - 05:30 0.50 EVAL P INTi 05:30 - 06:30 1.00 EVAL P INT1 06:30 - 08:00 1.50 EVAL P INTi 08:00 - 10:30 ~ 2.50 EVAL P ~ ~ INT1 10:30 - 12:30 I 2.00 EVAL P I I INT1 12:30 - 14:00 I 1.501 EVAL I P I I INT1 14:00 - 19:30 I 5.501 EVAL I P INT1 19:30 - 22:30 3.00 ~ EVAL ~ P ~ ~ INT1 -Pick up 15' space out pup and Kelly stand. -Pump ball to seat -Record slow pump rates. Core 60' from 4535' to 4595' -WOB 3k, RPM 50, Torque off bottom 3k,on bottom 4-5k -200 GPM ®900 psi -Drop ball and pump to seat 200 GPM ~ 800 psi. -Pressure up to 1420 psi to activate catcher. Rack back kelly stand and lay down 15' pup joint. -Pump dry job -Monitor well,static. -Mud wt in and out 10.8 ppg. -POH as per tripping schedule to 76' Clean rig floor. PJSM with crews and coring personnel on recovering core. -Break out bit and remove split ring. -Remove innner barrel. -Split innner barrel and lay down w/skate into pipeshed. Clean floor of coring fluid. Make up core barrel for run #4. -Make up additional 30' barrel. -Insert innner barrel. Make up core #4 BHA to 90'. Clear and clean rig floor prior to run in hole. Run in hole with coring assembly to 3025'. Circulate 140 bbls at the shoe, 250 GPM ~ 780 psi Run in hole with coring assembly 3025' to 4454' Break circulation,wash to bottom ~ 4595'. -Rack back stand,pick up 15' space-out pup. Drop ball & pump to seat, 200 GPM ~ 1050 psi. -Pressure up to activate coring assembly. -Cut Core #4 50 RPM,3k torque off bottom,4-6k on bottom. -200 GPM X1050 psi, WOB 5-10k. -Drop ball, pump down, 1,660 psi to activate core catcher. -Up wt 110k,down wt 85k,rotating wt 100k -Mud wt in and out 10.8 ppg. POH from 4675' 4359'. -Pull 80k over ~ 4589' -Backream from 4595' to 4359' -200 GPM ~ 1480 psi. 25 RPM. Drop dart & pump to seat to open circulating sub,155 GPM ~ 1120 psi. -Stage pumps up to 625 GPM ~ 3525 psi -Circulate bottoms up -Monitor wellstatic -Mud wt in and out 10.8 ppg. -Pump dry job,remove blower hose. POH from 4359' to 105' -Break out circ. sub and retrieve dart. -Clean floor of oil base coring fluid. Break out bit and remove split ring. -Make up bit and run back into top sub. -Remove innner barrel and lay down to pipeshed. ~ ~ BP Page 11 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/11/2008 19:30 - 22:30 3.00 EVAL P INT1 22:30 - 23:30 1.00 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INT1 5/12/2008 00:00 - 02:30 2.50 EVAL P INT1 02:30 - 03:00 0.50 EVAL P INT1 03:00 - 04:00 1.00 EVAL P INT1 04:00 - 04:30 0.50 EVAL P INT1 04:30 - 06:00 1.50 EVAL P INTi 06:00 - 08:00 I 2.001 EVAL P I I INT1 08:00 - 10:00 I 2.001 EVAL I P I INT1 10:00 - 15:30 5.50 EVAL P INT1 15:30 - 18:00 2.50 EVAL P INT1 18:00 - 19:00 1.00 EVAL P INT1 19:00 - 19:30 0.50 EVAL P INT1 19:30 - 22:00 2.50 EVAL P INTi 22:00 - 23:00 1.00 EVAL P INT1 23:00 - 00:00 1.00 EVAL P INT1 5/13/2008 00:00 - 01:00 1.00 EVAL P INT1 01:00 - 02:00 1.00 EVAL P INTi 02:00 - 03:30 1.50 EVAL P INTi 03:30 - 04:00 I 0.50 I EVAL I P I I INT1 -Break and lay down 30' of outer barrel. Make up innner barrel and bit. Clean and clear rig floor prior to running in with core #5. Run in hole from 79' to 3006' -Up wt 87k down wt 75k Service top drive Break circulation stage pumps to 200 GPM ~ 570 psi. -Hole took 13 bbl loss prior to circulating. -Losses while circulating 1/2 bbl per hour. Run in hole with coring assembly 3006' to 4517'. Break circulation,wash to bottom ~ 4675'. -Rack back stand,pick up single & 5' space-out pup. Drop ball to divert from inner barrel to outer barrel, pressure increase from 760 psi to 940 psi. -Record slow pump rates -Core from 4674' to 4734'. -Up wt 120k,down wt 90k,rotating wt 105k. -200 GPM ~ 1030 psi off bottom,1170 psi on bottom. -WOB 3-5k,torque 3k off bottom & 4-5k on bottom. Mud wt in and out 10.7 ppg, Vis = 170. Drop ball to activate catcher. -Pump to seat at 180 GPM ~ 890 psi. -Pressure up to 1300 psi. -Back ream from 4734' to 4423' -Open circ sub,pump dry job. POH as per tripping schedule 4423' to 76'. PJSM with core Iab,Baker coring and crews. -Retrieve ball,change out circ. sub. -Break out bit,remove split ring. -Install core cap and run into top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. - Run in to 70'. Clean and clear rig floor. Run in hole from 70' to 3002'. Circulate at shoe. -Stage pumps up to 250 GPM ~ 700 psi. -No losses. Service top drive. Run in hole from 3002' to 4612' Wash to bottom ~ 4735' -200 GPM ~ 850 psi -No space out pups required,drop ball. -Pump ball to seat 200 psi pressure increase. -Record slow pump rates Core (#6) from 4735' to 4795'. -PU - 117k, SO - 94k, RWT - 105k. -200 GPM ~ 990 psi off bottom 1120 psi on bottom -WOB 3-6k, 50 RPM, Torque off bottom 3k on bottom 4-6k -Mud wt in and out 10.6 ppg. Drop ball and pump on to seat. -200 GPM ~ 960 psi, pressured up to 1440 psi to activate PrintBtl: 8/8/Z008 12:18:26 PM • ~ BP Page 12 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/13/2008 03:30 - 04:00 0.50 EVAL P INT1 04:00 - 05:30 1.50 EVAL P INT1 05:30 - 06:00 0.50 EVAL P INT1 06:00 - 11:00 5.00 EVAL P INT1 11:00 - 13:30 2.50 EVAL P INT1 13:30 - 14:30 1.001 EVAL I P I I INT1 14:30 - 15:00 0.50 EVAL P INT1 15:00 - 16:30 1.50 EVAL P INTi 16:30 - 17:30 1.00 EVAL P INT1 17:30 - 18:00 0.50 EVAL P INT1 18:00 - 20:00 2.00 EVAL P INT1 20:00 - 21:30 1.50 EVAL P INT1 21:30 - 23:00 ~ 1.50 ~ EVAL ~ P ~ ~ INT1 23:00 - 23:30 I 0.501 EVAL I P I I INT1 23:30 - 00:00 I 0.501 EVAL P INT1 5/14/2008 ~ 00:00 - 01:00 ~ 1.00 ~ EVAL ~ P ~ ~ INT1 01:00 - 01:30 I 0.501 EVAL I P I I INT1 01:30 - 06:00 4.50 EVAL P INT1 06:00 - 08:30 2.50 EVAL P INT1 catcher. POH backreaming from 4795' to 4423' -200 GPM ~ 1560 psi, 25 RPM ~ 3-4 k torque. -No overpull -Open circ sub and pump out one stand,450 GPM ~ 2200 psi. Pump dry job -Blow down top drive,remove blower hose. POH as per tripping schedule 4423' to 76'. PJSM with core Iab,Baker coring and crews. -Retrieve ball,change out circ. sub. -Break out bit,remove split ring. -Install core cap and run in to top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. - Run in to 76'. Clean and clear rig floor. Run in hole from 76' to 3002'. -Up wt 80k down wt 68k Circulate at shoe. -Stage pumps up to 250 GPM ~ 725 psi. Service top drive. Run in hole from 3002' to 4613'. Wash to bottom ~ 4795' -180 GPM ~ 800 psi -Rack back stand, PU 2 singles required for space out, drop ball. -Pump ball to seat 200 psi pressure increase. -Record slow pump rates Core (#7) from 4795' to 4855'. -PU - 122k, SO - 93k, RWT - 105k. -200 GPM ~ 990 psi off bottom 1120 psi on bottom -WOB 4-6k, 50 RPM, Torque off bottom 3k on bottom 4-6k -Mud wt in and out 10.6 ppg. Drop ball and pump on to seat. -180 GPM ~ 860 psi, pressured up to 1370 psi to activate catcher. POH backreaming from 4855' to 4613' -200 GPM ~ 1460 psi, 25 RPM ~ 2-3k torque. -No overpull 'Lost total of 7 bbls of coring fluid for the day. (During trips only) Continue POH with core #7, backreaming from 4613' to 4424' -200 GPM ~ 1460 psi, 25 RPM ~ 2-3k torque. -No overpull -Open circ sub and pump out one stand to 4329' ~ 500 GPM ® 2600 psi. -No overpull Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. POH as per tripping schedule 4329' to 76'. PJSM with core Iab,Baker coring and crews. rnniea: aiwcwa is ia:m rm • gp Page 13 of 18 Operations Summary Report.. Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT .Phase Description of Operations 5/14/2008 06:00 - 08:30 2.50 EVAL P INT1 -Retrieve ball,change out circ. sub. 08:30 - 10:00 1.501 EVAL I P I INT1 10:00 - 14:30 4.50 EVAL P INTi 14:30 - 15:30 1.00 EVAL P INT1 15:30 - 00:00 8.50 EVAL P INT1 15/15/2008 100:00 - 01:00 I 1.00 EVAL I P I I INT1 01:00 - 01:30 0.50 EVAL P INTi 01:30 - 11:00 9.50 EVAL N RREP INT1 11:00 - 14:30 I 3.501 EVAL I P I I INT1 14:30 - 15:30 I 1.001 EVAL I P I I INT1 15:30 - 16:30 1.00 EVAL P INT1 16:30 - 17:00 0.50 EVAL P INT1 17:00 - 19:00 0.00 EVAL P INT1 19:00 - 20:00 1.00 EVAL P INT1 20:00 - 21:00 1.00 EVAL P INT1 21:00 - 21:30 0.50 EVAL P INT1 21:30 - 22:00 0.50 EVAL P INT1 22:00 - 22:30 0.50 EVAL P INT1 -Break out bit,remove split ring. -Install core cap and run into top sub. -Remove inner barrel and lay down to pipeshed. Make up inner barrels & top sub. -Remove core cap and make up bit. -Run in to 76'. -Rack back coring assembly. Clear and clean rig floor. Prepare BOP stack for BOPE test with water. Pull wear bushing, set test plug. -Rig up 4" test joint and test equipment. Test BOPE with 4" test joint. -250 psi low, 3500 psi high. -Each test 5 minutes each. -Accumulator drawdown test. -Test witnessed by AOGCC rep Jeff Jones, BP WSLs Tom Anglen, Robert French, NAD TPs Mark Ashley, Tim Leigh. -Trouble shoot and attempt tests on air actuated IBOP topdrive valve and Annular preventer without success. -Rig down 4" test equipment and change over to 3.5" test equipment. -Start ram tests with 3.5" test joint. '*No mud losses for the day. Continue testing rams with 3.5" test joint. -250 psi low, 3500 psi high. -Hold each test for 5 minutes each. Rig down test equipment. Leave blind rams closed. Change out air actuated IBOP valve on topdrive. Trouble shoot annular preventer hydraulic problem. -Repair 4-way control valve on accumulator. Rig up to test with 4" test joint. Test annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. - Change out to 3.5" test joint. Test upper, lower rams, and annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. Test witnessed by BP WSL Tom Anglen and NAD TP Mark Ashley. Rig down test equipment. Suck out water from BOP stack. Slowdown lines. Clean rig floor. Pick up core assembly and inspect coring bit. Run in hole with coring assembly from 76' to 3002'. -PU - 82k, SO - 69k. Install blower hose. Circulate ~ shoe. -250 gpm, 750 psi, 20 rpm, 1.7k TO. -PU - 87k, SO - 74k, RWT - 78k. Run in hole from 3002' to 4164'. Taking weight. Wash and ream from 4141' to 4325' taking steady 5k WOB. -200 gpm, 725 psi, 25 rpm, 2.7k TO. Backream from 4325' to 4141'. MW - 10.5 ppg in and out. POH for 9 7/8" hole opener from 4141' to 4047. No drag. -Monitor well -static. Printed: 8/6/2008 12:18:26 PM ~ ~ B P Page 14 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/15/2008 22:00 - 22:30 0.50 EVAL P INTi 22:30 - 23:30 1.00 EVAL P INT1 23:30 - 00:00 0.50 EVAL P INTi 5/16/2008 00:00 - 02:00 2.00 EVAL P INT1 02:00 - 03:00 1.00 EVAL P INT1 03:00 - 04:00 1.00 EVAL P INT1 04:00 - 05:00 1.00 EVAL P INT1 05:00 - 06:00 1.00 EVAL P INTi 06:00 - 07:00 1.00 EVAL P INTi 07:00 - 07:30 0.50 EVAL P INT1 07:30 - 08:00 0.50 EVAL P INT1 08:00 - 08:30 0.50 EVAL P INT1 08:30 - 14:00 5.50 EVAL P INT1 14:00 - 16:00 2.001 EVAL P I I INT1 16:00 - 16:30 0.50 EVAL P INT1 16:30 - 17:00 0.50 EVAL P INT1 17:00 - 17:30 0.50 EVAL P INT1 17:30 - 19:00 1.50 EVAL P INTi 19:00 - 20:00 1.00 EVAL P INT1 20:00 - 21:30 1.50 EVAL P INT1 21:30 - 00:00 2.50 EVAL P INT1 5/17/2008 00:00 - 00:30 0.50 EVAL P INTi 00:30 - 01:15 0.75 EVAL P INT1 01:15 - 02:30 1.25 EVAL P INT1 02:30 - 03:30 ~ 1.00 ~ EVAL ~ P ~ ~ INT1 03:30 - 04:00 I 0.501 EVAL I P I I INT1 -Pump dry job. POH from 4047' to shoe. Monitor well -static. POH from 3025' to 2623'. Continue POH with core assembly #16. -Stand back core assembly. Clear and clean rig floor. Pick up and make up hole opener assembly #17 to 925. Run in hole from 925' to 3020'. Cut and slip 92' drilling line. Service topdrive, crown, and drawworks. Circulate ~ shoe. -500 gpm, 2100 psi. -60 rpm, 1.9k TO. -PU - 90k, SO - 75k. Run in hole from 3020' to 4346'. Precautionary wash from 4346' to 4454'. -500 gpm, 2600 psi, 120 rpm, 3k TO. Open 8 1/2" hole to 9 7/8" from 4454' to 4815'. -500 gpm, 2495 psi off, 2525 psi on. -120 rpm, 3.1 k TO off, 4.5k TO on. -PU - 122k, SO - 90k, RWT - 107k, WOB - 10k. Circulate 15 minutes prior to connections. Circulate 3 bottoms up. -500 gpm, 2520 psi. -120 rpm, 4.1 k TO. -MW - 10.5 ppg in and out. -Monitor well -static. POH from 4815' to 4356'. -PU - 130k, SO - 96k. Monitor well -static. -Pump dry job. POH from 4356' to 3020'. -Monitor well -static. POH from 3020' to 95'. Laydown hole opener assembly BHA #17. Clear and clean rig floor. Pick up coring assembly, BHA #18 and run in hole to 3003'. *5 bbl coring fluid loss for the day. Circulate at shoe. -255 gpm, 655 psi. Run in hole from 3003' to 4708'. Wash to bottom ~ 4855' -250 GPM ~ 930 psi -PU 15 ft pup joitn required for space out, drop ball. -Pump ball to seat 150 psi pressure increase. -Record slow pump rates Core (#8) from 4855' to 4905'. -PU - 125k, SO - 95k, RWT - 106k. -200 GPM ~ 890 psi off bottom 975 psi on bottom -WOB 5k, 55 RPM, Torque off bottom 4k on bottom 7k -Mud wt in and out 10.5 ppg. Drop ball and pump on to seat. -200 GPM ~ 835 psi, pressured up to 1290 psi to activate rnmeu: wwcwo ~c.io.cv rrvi ~ ~ BP Page 15 of 18 operations Summary Report Legal Well Name: L-205 ,Common Well Name: L-205 Spud Date: 4/27/2008 'Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 .Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/17/2008 03:30 - 04:00 0.50 EVAL P INTi catcher. 04:00 - 04:30 0.50 EVAL P INT1 POH backreaming from 4905' to 4708' -200 GPM ~ 1215 psi, 20 RPM ®4k torque. -No overpull, one 10k torque spike ~ 4777'. -Open circ sub and pump out one stand to 4613' -425 GPM ~ 1940 psi. 04:30 - 05:00 0.50 EVAL P INT1 Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. 05:00 - 11:00 6.00 EVAL P INT1 POH as per tripping schedule 4613' to 76'. 11:00 - 13:00 2.00 EVAL P INT1 PJSM with core Iab,Baker coring and crews. -Retrieve ball, change out circ. sub. -Break out bit, remove split ring. -Install core cap and run in to top sub. -Remove inner barrel and lay down to pipeshed. 13:00 - 14:00 1.00 EVAL P INTi Make up inner barrels & top sub. -Remove core cap and make up bit. - Run in to 76'. 14:00 - 14:30 0.50 EVAL P INTi Clean and clear rig floor. 14:30 - 16:30 2.00 EVAL P INTi Run in hole from 76' to 3003'. -Up wt 86k down wt 72k 16:30 - 17:00 0.50 EVAL P INTi Circulate at shoe. -Stage pumps up to 250 GPM ~ 745 psi. -25 rpm, 3.6k tq. 17:00 - 18:00 1.00 EVAL P INTi Run in hole from 3002' to 4707'. 18:00 - 19:30 1.50 EVAL P INTi Wash to bottom ®4905' -200 GPM ~ 860 psi -Pump ball to seat, 120 psi pressure increase. -Record slow pump rates 19:30 - 21:00 1.50 EVAL P INTi Core (#9) from 4905' to 4965'. -PU - 128k, SO - 98k, RWT - 108k. -200 GPM ~ 925 psi off bottom 960 psi on bottom -WOB 4-7k, 50 RPM, Torque off bottom 3.7k on bottom 5.ik -Mud wt in and out 10.6 ppg. 21:00 - 21:30 0.50 EVAL P INT1 Drop ball and pump on to seat. -180 GPM ~ 790 psi, pressured up to 1310 psi to activate catcher. 21:30 - 23:00 1.50 EVAL P INTi POH backreaming from 4965' to 4798' -210 GPM ~ 1260 psi, 20 RPM ®4.3k torque. -No overpull -Open circ sub and backream 1 stand to 4702' -445 GPM ~ 2200 psi, 25 rpm ~ 4k tq. Attempt to POH dry. 25k drag. -Backream 2 more stands to 4511'. -445 GPM ~ 2110 psi, 25 rpm ~ 3.6k tq. -POH dry 2 stands to 4329'. 23:00 - 23:30 0.50 EVAL P INT1 Monitor well -static. -Pump dry job -Blow down top drive, remove blower hose. -MW 10.6 ppg in and out. 23:30 - 00:00 0.50 EVAL P INT1 POH as per tripping schedule 4329' to 4235'. 5/18/2008 00:00 - 05:00 5.00 EVAL P INTi POH as per tripping schedule 4329' to 76'. 05:00 - 08:00 3.00 EVAL P INT1 PJSM with core Iab,Baker coring and crews. Printed: 8/62008 12:18:26 PM ~ ~ gp Page 16 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/18/2008 05:00 - 08:00 3.00 EVAL P INT1 -Retrieve ball, laydown circ. sub. -Break out bit, remove split ring. -Install core cap and run in to top sub. -Remove inner barrel with core #9 and lay down to pipeshed. 08:00 - 08:30 0.50 EVAL P INT1 Clear and clean rig floor. 08:30 - 09:00 0.50 EVAL P INT1 Service topdrive, drawworks, and crown. 09:00 - 11:30 2.50 EVAL P INT1 Finish cutting cores in pipeshed. Rig down core equipment in pipeshed. 11:30 - 12:30 1.00 DRILL P INT1 Load BHA into pipeshed. Program MWD/Eco Scope tools. 12:30 - 15:00 2.50 DRILL P INT1 PJSM. Pick up and make up drilling BHA #20: New HTC 8.5" MXL-1X bit, NM Stab, Eco Scope, MWD, 8.5" ghost reamer, tea NM DC, NM stab, ball catcher, CCV, 1 jt 5" HWDP, Jar, 1 jt 5" HWDP, XO, 24 jts 4" HWDP. -Shallow hole test MWD ~ 980', 400 gpm, 1145 psi. 15:00 - 16:00 1.00 DRILL P INT1 Run in hole from 980' to 3010'. 16:00 - 16:30 0.50 DRILL P INT1 Circulate at shoe. -450 gpm, 2160 psi. -50 rpm, 2.2k torque. -PU - 96k, SO - 78k, RWT - 86k. -Install blower hose, record slow pump rates. 16:30 - 17:30 1.00 DRILL P INT1 Run in hole from 3010' to 4874'. -Wiped 9 7/8" x 8.5" interface - no drag. 17:30 - 18:30 1.00 DRILL P INT1 Wash and ream to bottom ~ 4965'. -300 gpm, 1450 psi, 40 rpm, 4.4k torque. -Record slow pump rates. 18:30 - 23:30 5.00 DRILL P INTi Drill 8.5" logging rathole from 4965' to TD ®5165' MD, 4687' TVD. -475 gpm, 2910 psi off bottom, 3050 psi on bottom. -120 rpm, 4.6k tq off bottom, 4.8k tq on bottom. -PU - 145k, SO - 100k, RWT - 114k. -ADT - 4.13 hrs 23:30 - 00:00 0.50 DRILL P INTi Circulate bottoms up at TD. 475 gpm, 2850 psi, 120 rpm, 4.9k torque. 'No mud loss for the day. 5/19/2008 00:00 - 00:30 0.50 DRILL P INT1 Finish circulating bottoms up at TD. -475 gpm, 2850 psi, 120 rpm, 5k torque. 00:30 - 08:00 7.50 DRILL P INT1 MadPass log from 5165' to 4401'. -150 fph max, survey every 90'. -475 gpm, 2730 psi, 55 rpm, 4.8k torque. -Wiped 8 1/2" x 9 7/8" interface several times - no drag. -Monitor well ~ 4401' -static. MW 10.6 ppg in and out. 08:00 - 09:30 1.50 DRILL P INT1 POH from 4401' to 2979'. -Pulled tight to 35k over from 4375' to 4355'. Wiped clean. 09:30 - 10:00 0.50 DRILL P INT1 Open CCV, circulate at shoe. -600 gpm, 3000 psi. -Monitor well -static. -Pump dry job. 10:00 - 11:30 1.50 DRILL P INT1 POH from 2979' to 245'. -Close CCV. 11:30 - 12:00 0.50 DRILL P INTi Stand back jar stand. -Slowdown topdrive and clean floor. 12:00 - 14:00 2.00 DRILL P INT1 PJSM on nuclear source. Laydown BHA #20. rnniw. wwcvw ic. w.cv rm ~ • BP Page 17 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours. Task Code NPT -Phase Description of Operations 5/19/2008 12:00 - 14:00 2.00 DRILL P INT1 -Bit grade - 1-1-NO-A-E-I-NO-TD 14:00 - 15:30 1.50 DRILL P INT1 Clear and clean rig floor. 15:30 - 17:00 1.50 EVAL P INT1 Spot E-line unit and build logging tools. -Continue cleaning rig. 17:00 - 19:30 2.50 EVAL P INT1 Rig up SWS wireline. 19:30 - 23:30 4.00 EVAL P INT1 Run in hole with Platform Express and Dipole Shear Sonic Imager loggine tools to 5140'. Log from 5140' to 2600'. POH with logging tools. 23:30 - 00:00 0.50 EVAL P INT1 Rig down SWS wireling. 5/20/2008 00:00 - 01:30 1.50 EVAL P INT1 Continue rigging down SWS tools, clean and clear floor 01:30 - 03:00 1.50 PXA P SURE PJSM. Rig up to run 3.5" NSCT cement stinger. 03:00 - 05:00 2.00 PXA P SURE Pick up and make up 3.5" NSCT mule shoe and 27 joints of NSCT tubing to 858'. 05:00 - 05:30 0.50 PXA P SURE Rig down tubing running equipment and change over to 4" drill pipe equipment. 05:30 - 07:30 2.00 PXA P SURE Run in hole with cement stinger on 4" drill pipe from 858' to 5165'. Up Wt. 110k Dn. Wt. 80k 07:30 - 08:30 1.00 PXA P SURE Circulate and Reciprocate ~ 5165'. Stage pumps at 515 bpm ~ 3100 psi. Up Wt. 105k Dn. Wt. 80k 08:30 - 09:30 1.00 PXA P SURE PJSM with Dowell. Pumped 5 bbl of H2O and pressure tested lines to 4000 psi. Good Test Pumped a spacer of 19 bbl of Chem Wash, then 69 bbl 15.8 ppg of class G cement, then follwed with 2.5 bbl of H2O. Swapped over to rig pumps and displaced with 37 bbl of 10.5 ppg MOBM. 09:30 - 10:00 0.50 PXA P SURE Trip out of hole from 5156' to 4365' Up Wt. 95k Dn. Wt. 80k 10:00 - 10:30 0.50 PXA P SURE Circulate a bottoms up ~ 4365'. 600 gpm ~ 2900 psi Up Wt. 95k Dn. Wt. 75k 10:30 - 11:30 1.00 PXA P SURE Wash down to 4435'. Rig up the cement head and lines Pumped a spacer of 19 bbl of Chem Wash, then 91 bbl 15.8 ppg of class G cement, then follwed with 2.5 bbl of H2O. Swapped over to rig pumps and displaced with 30 bbl of 10.5 ppg MOBM. 11:30 - 12:30 1.00 PXA P SURE Rig Down the cement head and lines. Trip out of the hole from 4435' to 3465'. 12:30 - 14:30 2.00 PXA P SURE Circulate and condition 2x drill pipe volume ~ 500 gpm, 1820 psi. Pump wiper ball and condition. i PJSM for cement plug #3 ', 14:30 - 15:00 0.50 PXA P SURE Wash down from 3465' to 3650' ~ 500 gpm, 1780 psi 15:00 - 16:30 1.50 PXA P SURE Rig up the cement head and lines Pumped a spacer of 19 bbl of Chem Wash, then 82 bbl 17 ppg of class G cement, then follwed with 2.5 bbl of H2O. 16:30 - 17:00 0.50 PXA P SURE Trip out of hole from 3650' to 2825' Pump wiper ball and condition. 17:00 - 19:30 2.50 PXA P SURE Displace to water based mud, pump spacer ~ 400 gpm, 1710 Printed: 8/8/2008 12:18:26 PM w i gP Page 18 of 18 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: ORIG DRILLING Start: 4/25/2008 End: 5/21/2008 Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/20/2008 17:00 - 19:30 2.50 PXA P SURE psi Displace with seawater 19:30 - 22:00 2.50 PXA P SURE Trip out of hole from 2825' to 810' Rig up to UD 3 1/2" tubing 22:00 - 00:00 2.00 PXA P SURE Continue to trip out of the hole from 810' to 345' 5/21/2008 00:00 - 02:00 2.00 P SURE Continue laying down 3 1/2" tubing from 345' to 0' Bottom 5 joints had 1/8" shealth of cement on them 02:00 - 09:00 7.00 PXA P SURE Clean and clear the floor and scrub the pits to get all remaining 09:00 - 11:30 2.50 PXA N WAIT SURE 11:30 - 16:30 5.00 PXA P SURE 16:30 - 21:00 4.50 PXA N WAIT SURE OBM out of the mud system. Used hot soapy water to clean the system out Flushed out the stack. Waiting on trucks due to G & I being down. -Unable to continue cleaning due to waste fluids. Clean and clear the floor and scrub the pits to get all the remaining OBM out of the mud system. Used hot soapy water to clean out the entire system. Waiting on trucks due to G & I being down. -Unable to transport mud from plant to rig. Printeu: wcrzoos tz:ta:zti rnn gp Page 1 of 30 Operations Summary Report ',Legal Well Name: L-205 'Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/21/2008 21:00 - 00:00 3.00 DRILL P INT1 PJSM, Consisted of Nad rig crew, DD, MWD, and BP WSL Matt Martyn and WSLf Chris Kobuck. Preparing to pick up BHA # 21 that consists of nukes. -Began to pick up BHA to MWD tool. 5/22/2008 00:00 - 03:30 3.50 DRILL P INT1 Continued to pick up BHA # 21 and run in the hole to 2804'. -Began to wash down ~ 1 bpm, 100 psi to 3016'. -Tagged cement ~ 3016' and slacked off 30k on it. -AOGCC witness waived by Bob Noble. Test witnessed by BP WSL Matt Martyn. 03:30 - 04:00 0.50 DRILL P INT1 Drill out cement from 3016' to 3025' -Up Wt. 120k /Down Wt. 70k /ROT 90k / WOB 2k -450 gpm ~ 1100 psi off and 1200 psi on -55 RPM, TO 6k on / 4k off 04:00 - 05:30 1.50 DRILL P INT1 Displace mud system to Water Base -LSND 8.8 ppg -475 gpm ~ 840 psi -Cleaned surface equipment while displacing 05:30 - 08:30 3.00 DRILL P INT1 Control Drill out cement from 3025' to 3089' -Up Wt. 105k /Down Wt. 80k /ROT 90k / WOB 2k -650 gpm ~ 1350 psi off and 1375 psi on -40 RPM, TO 5k on / 4k off -Established ECD baseline ~ 3029' 08:30 - 12:00 3.50 DRILL P INT1 Drill 9 7/8" from 3089' to 3660' -Up Wt. 115k /Down Wt. 80k /ROT 92k / WOB 10k -650 gpm ~ 1675 psi off and 1740 psi on -80 RPM, TO 6k on / 5k off -CECD 9.06 AECD 9.73 -ART 1.88 / AST 1.68 /ADT 3.56 -Pumped a 32 bbl Hi-Vis sweep ~ 3600' and had a 5% increase in returns. 12:00 - 00:00 12.00 DRILL P INT1 Drill 9 7/8" from 3660' to 4833' -Up Wt. 135k /Down Wt. 93k /ROT 107k / WOB 10k -650 gpm ~ 2225 psi off and 2420 psi on -80 RPM, TO 6k on / 5k off -CECD 9.32 AECD 10.03 -ART 6.62 / AST 1.82 /ADT 8.44 5/23/2008 00:00 - 05:00 5.00 DRILL P INT1 Drill 9 7/8" from 4833' to 5271' -Up Wt. 137k /Down Wt. 90k /ROT 105k / WOB 20k -650 gpm ~ 2440 psi off and 3200 psi on -80 RPM, TO 9k on / 7k off 05:00 - 06:00 1.00 DRILL P INT1 Circulate and discuss final TD due to geological tops. -Rotate and Reciprocate 2x bottoms up ~ 5270'. -440 gpm ~ 1400 psi 06:00 - 11:30 5.50 DRILL P INT1 Drill ahead from 5270' to 5590' -Up Wt. 137k /Down Wt. 90k /ROT 106k / WOB 20k -650 gpm ~ 2850 psi off and 3000 psi on -80 RPM, TO 9k on / 7k off -AECD = 9.88 CECD= 9.38 -MW In & Out 9.2ppg 11:30 - 12:00 0.50 DRILL P INT1 Circulate and condition mud ~ 5590' -Rotate and Reciprocate 1x bottoms up ®5590 -650 gpm ~ 2850 psi rnnzeo: ncacwo c.co.w+ rm ~ ~ gp Page 2 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/23/2008 12:00 - 17:30 5.50 DRILL P INTi Back ream from 5590' to 3945'. 17:30 - 21:00 I 3.501 DRILL I P I I INT1 21:00 - 22:30 1.50 DRILL P INT1 22:30 - 00:00 1.50 EVAL P INT1 5/24/2008 00:00 - 06:00 6.00 EVAL P INT1 06:00 - 10:00 4.00 EVAL P INT1 10:00 - 12:00 2.00 EVAL P INT1 12:00 - 00:00 12.00 EVAL P INT1 15/25/2008 00:00 - 02:30 2.50 EVAL P INT1 02:30 - 05:00 2.50 EVAL P INT1 05:00 - 13:30 I 8.501 EVAL I P I I INT1 13:30 - 17:00 I 3.501 EVAL I P I I INT1 17:00 - 21:00 I 4.001 EVAL I P I I INT1 21:00 - 00:00 I 3.001 EVAL I P I I INT1 00:00 - 03:30 I 3.501 EVAL I P I I INT1 03:30 - 06:30 I 3.001 EVAL I P I I INTi 06:30 - 08:00 1.50 EVAL P INTi 08:00 - 10:00 2.00 EVAL P INT1 -Mad Pass from 5590' to 4350' -Up Wt. 130k /Down Wt. 90k /ROT 105k -650 gpm ~ 2650 psi off -80 RPM, TO 7k off Trip out of the hole from 3945' to 152' -Monitor well "static" -Up Wt. 125k /Down Wt. 90k Lay down BHA # 21 and clean and clear floor for logging tools. PJSM, w/ SWS and NAD hands, BP WSL Matt Martyn and WSLf Chris Kobuck. -Rig up SWS wireline and prepare to begin logging. Running in hole to w/ MDT tools on DP to -4,125' md. Run in hole from 4125' to 4314' -Verified latch up, 5bpm ~ 405 psi Pressure samples C~ 4380.6' , 4386.6', and 4412.6' -Up Wt. 105k Down Wt. 80k MDT pressure samples -4461.7', 4463.8', 4485.6', 4488.6', 4572.6', 4592.6', 4594.6', 4610.6', 4612.6', 4669.5', 4677.6', 4712.7', 4877.5', 4878.6', 4901.6', 4916.6', 4917.7', 4935.6', 5015.6', 5026.7', 5064.5', 5108.5', 5128.7', 5251.6', 5252.6', 5271.6' - Up Wt. 120k Down Wt. 82k -Mud Wt In & Out 9.2 ppg MDT Pressures -5265', 5301'. 5430', 5449', 5503' MDT Sample # 1 ~ 5265' - SB_OBa Formation - 2 450cc chambers of fluid recovered MDT Sample # 2 ~ 5122', 5124', 5130' - SB_OBb Formation - No Fluid recovered -Going to attempt to get a sample after completing other samples. MDT Sample # 3 ~ 5503' - SB_OBd Formation - 3 450cc chambers of fluid recovered MDT Sample # 4 ~ 5009' - SB_OBa Formation -3 450cc chambers of fluid recovered MDT Sample # 5 ~ 4895' -SB OA Formation -2 450cc chambers of fluid recovered MDT Sample # 6 ~ 4673' -SB Nb Formation -4 450cc chambers of fluid recovered Attempting to get a sample from the 5122' - 5130' area that wasn't successful earlier. -Sample was unsuccessful due to geology..tool working properly but sample was not recovered. Trip out of the hole from 5102' to 4080' -Up Wt. 120k Down Wt. 75k PJSM, Rig Down SWS Printed: 7/23/2008 2:28:44 PM BP Operations Summary Report Page 3 of 30 ~ Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 15/26/2008 10:00 - 12:00 I 2.00 EVAL I P I INT1 12:00 - 15:30 3.50 EVAL P INT1 15:30 - 16:00 0.50 EVAL P INT1 16:00 - 16:30 0.50 EVAL P INT1 16:30 - 17:30 1.00 EVAL P INT1 17:30 - 18:30 1.00 EVAL P INTi 18:30 - 19:30 1.00 EVAL P INT1 19:30 - 21:00 1.50 EVAL P INT1 21:00 - 21:15 0.25 EVAL P INT1 21:15 - 00:00 2.75 EVAL P INT1 5/27/2008 00:00 - 02:00 2.00 EVAL P INT1 02:00 - 03:30 1.50 CASE P INT1 03:30 - 07:00 3.50 CASE P INT1 07:00 - 10:00 3.00 CASE P INT1 10:00 - 10:30 0.50 CASE P INT1 10:30 - 12:00 1.50 CASE P INT1 12:00 - 13:00 1.00 CASE P INT1 13:00 - 21:30 8.50 CASE P INTi 21:30 - 22:30 1.00 CASE P INT1 Monitor well, static -Pump 15 bbl 11.5 ppg Dry Job, 170 gpm ~ 265 psi -Blow down the top drive -Trip out of the hole from 4080' to 161' PJSM, Lay down SWS tools -clean and clear floor PJSM, Pick up clean out BHA # 22 -9.875 Hole Opener, 9.875 NB Stab, Jars Run in hole to 938' Service rig, crown, and adjust the brakes Run in hole from 938' to 2938' -Install blower hose and fill pipe -Up Wt. 96k Down Wt. 68k Continue to run in the hole from 2938' to 5499' Screw into drillstring and stage pumps up to 650 gpm, 2540 psi. PU - 135k, SO - 70k, RTW - 100k. 120 rpm, 6k TO. Circulate bottoms up followed by 35 bbl hi vis sweep surface to surface. Shakers cleaned up well after initial bottoms up. No change in cuttings load on shakers once sweep back to surface. No losses while circulating. Shut down, monitor well -static. MW in 9.2 ppg, MW out 9.2 ppg. Pump dry job. Install air slips. Prepare to POH. POH from TD to top of cleanout BHA. No overpulls over 5k on trip out. PJSM, Lay down BHA # 22 from cleanout run. -Everything in great shape...no sticky spots found. PJSM, Rigging up to run 7 5/8" casing. Change out upper rams from variables to 7-5/8" pipe rams. PU 7-5/8" test joint & test upper rams to 500 psi low & 3,500 psi high. Good test. Continue to RU for casing run. Make dummy run with landing joint. Install 350 ton elevators and slips. PU and RIH with 7-5/8" 29.7# L-80 BTC-M shoe track and check floats -holding. Continue PU and RIH with 7-5/8" 29.7# L-80 BTC-M casing to 1,155', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 8,400 ft-Ibs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. RU the rig floor to run 7-5/8" VamTop casing. Crossover and RIH with 7-5/8" 29.7# L-80 VamTop to 1768' - torque turning each connection with 14,450 ft-Ibs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. Circulate a bottoms up prior to going into the open hole with the casing - 302 gpm, 547 psi, PU - 115k, SO - 92k. Continue PU and RIH with 7-5/8" 29.7# L-80 VamTop to 5,555' - torque fuming each connection with 14,450 ft-Ibs and utilizing Jet Lube Seal Guard thread lubricant. Filled every joint with the fillup tool and broke circulation every 5 joints RIH and circulated for 10 minutes every 15 joints while running in the hole. MU the casing hanger and landing joint. Land the hanger on the ring with the shoe at 5,582'. LD the fillup tool and RU the rnniea: nc.vcwo cco.w. nv~ BP Page 4 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date- From - To Hours Task Code NPT Phase Description of Operations 5/27/2008 21:30 - 22:30 1.00 CASE P INT1 cement head, PU - 210k, SO - 115k. Ran total of: 25 jts 7 5/8" 29.7# L-80 BTC-M casing, 110 jts 7 5/8" 29.7# L-80 VamTop casing 1 X-over jt 7 5/8" TCII box XBTC-M pin 2 ea. 10 'BTC-M pup joints 4 ea. 20 'BTC-M pup joints X81 straight 7-3/4" x 9-5/8" x 8" centralizers X40 stop rings 22:30 - 00:00 1.501 CASE I P 00:00 - 03:00 I 3.00 I CEMT I P INTi Shoe ~ 5,582' RA tags ~ 5,072', 4,915', & 4,689' Circulate and condition mud -Stage pumps up to 7 bpm ~ 570 psi -Up Wt. 205k Down Wt. 110k 7 5/8" Casing Cement Job -Pump 5 bbfs of water ~ 5 bpm -Pressure test lines to 3500 psi -Pump 50 bbls of 12ppg Mud Push ~ 5 bpm -Drop Bottom Plug -Kick out plug with 82 bbls of 16 ppg cement containing durastone -Drop top plug -Kick out plug with 5 bbls from Dowell -Pressured up with 2340 strokes -Issues with bottom plug bursting, pressured up with rig pumps to 3800 psi with no luck -Switched over to Dowell pumps and pressured to 5000 psi 5 different times with no luck. Conference call with Mike Shultz, Rob Tirpack, Scott Kolstad, Matt Martyn, Brian Buzby, and Chris Kobuck to decide what actions are to be taken due to cement displacement issues. Rigging up to pull 7 5/8" casing. -350 ton elevators, power tongs, and prep rig floor and pipe shed for laying down the casing. PJSM, Lay down 7 5/8" 29.7# L-80 Vam Top HC from 5582' to 3717' -Up Wt. 200k Down Wt. 130k Continue to lay down 7 5/8" 29.7# L-80 Vam Top HC from 371 T to 2954' -Up Wt. 160k Down Wt. 110k -Pick up hanger and and landing joint -Land casing ~ 2982' Rig down 7 5/8" Casing Equipment -Change out bales from long to short bales Install Pack-off -FMC hand Keith on hand for packoff installation. PJSM, Pick up tools to the floor -Make up BHA #23 for cement clean out Run in hole from 142' to 877' Ream down from 877' to 1111' -103 spm ®300 gpm, 475 psi INT1 03:00 - 04:00 1.00 CEMT I N I CEMT INT1 04:00 - 05:30 I 1.501 CEMT I N I CEMT I INT1 05:30 - 12:00 ( 6.501 CEMT I N I CEMT I INTi 12:00 - 16:30 I 4.501 CEMT I N I CEMT I INT1 16:30 - 17:30 1.00 CEMT N CEMT INT1 17:30 - 18:30 1.00 CEMT N CEMT INTi 18:30 - 19:30 1.00 CEMT N CEMT INTi 19:30 - 20:30 1.00 CEMT N CEMT INTi 20:30 - 21:30 1.00 CEMT N CEMT INT1 Printed: 7/23/2008 2:28:44 PM gp Page 5 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 15/28/2008 120:30 - 21:30 I 1.00 CEMT I N I CEMT ~ INT1 21:30 - 00:00 I 2.501 CEMT N CEMT INT1 ~ 5/29/2008 ~ 00:00 - 12:00 ~ 12.00 ~ CEMT ~ N ~ CEMT ~ INT1 12:00 - 19:00 7.00 CEMT I N CEMT INT1 19:00 - 20:00 I 1.001 CEMT I N I CEMT I INT1 20:00 - 21:00 1.00 CEMT N CEMT INT1 21:00 - 21:30 0.50 CEMT N CEMT INT1 21:30 - 22:30 1.00 CEMT N CEMT INTi 22:30 - 23:00 0.50 CEMT N CEMT INTi 23:00 - 00:00 1.00 CEMT P INT1 5/30/2008 ~ 00:00 - 04:30 ~ 4.50 ~ CEMT ~ P ~ ~ INT1 04:30 - 05:00 0.50 CEMT N CEMT INT1 05:00 - 05:30 0.50 CEMT N CEMT INT1 05:30 - 06:30 1.00 CEMT N CEMT INT1 06:30 - 12:00 5.50 CEMT N CEMT INT1 -Up Wt. 55k Down Wt. 52k ROT 53k -25 RPM with 4k Torque -Top Pluglocated ~ 1111' -Verification of Black Plug found on shakers -Initially Durastone was thick coming over shakers, than tapered off to minimal Durastone on the shakers. Ream down from 1111' to 1259' -103 spm ®300 gpm, 520 psi off 760 psi on -Up Wt. 60k Down Wt. 55k ROT 59k -30 RPM with 4k Torque off and 1.6k on Drill out cement from 1259' to 2117' -103 spm ~ 300 gpm -Up Wt. 75k Down Wt. 60k ROT 67k WOB 15k -30 RPM with 2.5k Torque off and 1.5k on -Psi On 975 /Off 780 -BOP started to become erratic around 1530' after varying parameters, still no Iuck...After spudding on bit obstruction broke free and ROP picked back up to normal. Drill out cement from 2117' to 2466' -101 spm ~ 300 gpm -Up Wt. 80k Down Wt. 65k ROT 72k WOB 20k -30 RPM with 2k Torque off and 2.4k on -Psi On 1205 /Off 890 Circulate a bottoms up -101 spm ~ 300 gpm , 930 psi -Displace to 8.5ppg clean seawater -77 spm ~ 228 gpm , 475 psi Begin to trip out of the hole from 2466' to 112' -Up Wt. 84k Down Wt. 66k Lay down BHA -Jars, Bypass sub, and Motor Pull wear ring and flush out the stack to prepare for BOP test Pick up BOP test tools -Install the test plug and rig up to test BOPs Rig up to test with 7 5/8" test joint. Test annular preventer to 250 psi low, 3500 psi high for 5 minutes each test - OK. - Test witnessed by BP WSL Matt Martyr and NAD TourPusher Wayne Stout. -Witness waived by AOGCC rep Jeff Jones Continue to Test BOP - Change out to 4" test joint. Test upper, lower rams, and annular preventer to 250 psi low, 3500 high -Test Winessed by BP WSL Matt Martyr and NAD TourPusher Wayne Stout. Lay down the test plug -Install the wear bushing with a 7 3/8" ID Pick up BHA # 24 -6 3/4" Bit, Motor, Drill Collars, Jars, HWDP -Run in hole to 142' Continue to trip in the hole from 142' to 2466' Drill up cement from 2466' to 2861' rnmeu: nc.acwo c.w.•w rrv~ ~~ - BP Page 6 of 30 Operations :Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 15/30/2008 106:30 - 12:00 I 5.501 CEMT I N I CEMT I INT1 12:00 - 13:30 I 1.501 CEMT I N I CEMT I INT1 13:30 - 15:30 2.00 CEMT N CEMT INT1 15:30 - 16:00 0.50 CEMT N CEMT INT1 16:00 - 17:00 1.00 CEMT N CEMT INT1 17:00 - 18:00 1.00 CEMT N CEMT INT1 18:00 - 00:00 I 6.00 I CEMT I N I CEMT I INT1 15/31/2008 100:00 - 06:30 ~ 6.501 CASE N I CEMT INT1 06:30 - 08:00 1.50 CASE N CEMT INT1 08:00 - 09:00 1.00 WHSUR N CEMT INT1 09:00 - 11:00 2.00 WHSUR N CEMT INT1 11:00 - 12:00 1.00 WHSUR N CEMT INT1 12:00 - 13:00 1.00 CASE N CEMT INT1 13:00 - 14:30 1.50 CASE N CEMT INT1 14:30 - 16:30 2.00 CASE N CEMT INT1 16:30 - 18:00 I 1.50 I CASE I N I CEMT I INT1 18:00 - 22:30 4.501 CASE ~ N I CEMT INT1 -Up Wt. 90k Down Wt. 71k ROT 77k -300 gpm ~ 910 psi on / 765 psi off -WOB 15k -Torque 2.2k on / 2k off Circulate bottoms up - 102 spm , 302 gpm ~ 764 psi -Pump Hi-vis sweep and chase with water -78 spm, 232 gpm ~ 457 psi Trip out of hole from 2861' to 142' -Up Wt. 90k Down Wt. 70k Lay down BHA # 24 Pull wear ring and pack off Make up landing joint and pull hanger to floor and lay down -Up Wt. 115k Down Wt. 90k -MWT 9.1PP9 Lay down casing 1 at a time from 2954' to 1434' -All threads inspected by VAM rep Andy Fain -Up Wt. 75k Continue to lay down 7 5/8" Casing from 1434' to 93' -Cut a hole in the casing with the assistance of the welder in order to analyze the issues with the cement additives (durastone) -Bottom plug (orange) was located at the float collar -Completely packed off with Durastone in plug and last joint. -Plug sheared but was packed off by Durastone Finish pulling shoe track and then rig down casing equipment -Clean and Clear rig floor and prepare to change out rams. Flush out the BOP stack and install the test plug. Rig up testing equipment. Change out rams from 7 5/8" to 3 1/2" x 6" Vari Rams -Test to 250 psi low / 3500 psi high...Good test Blow down all test equipment -Pulled the test plug -Installed the wear ring Pick up BHA # 25 -Hole Opener ,HWDP, Jars, HWDP Run in hole from 108' to 2938' -Fill pipe and install blower hose -Up Wt. 95k Down Wt. 70k Continue to run in the from from 2938' to 5499' -Wash down to 5591' -202 spm ~ 599 gpm, 2321 psi -Saw a few tight spots running in the hole that took 20k over -3182' -3900' -4000' Circulate a bottoms up -Pump 40 bbl Hi-Vis Sweep surface to surface -120 spm ~ 653 gpm , 2723 psi -100k ROT ~ 110 RPM , 6.6k Torque -9.2 MWT. Monitor well "static" -Pump Dry Job Printed: 7/23/2008 2:28:44 PM gP Page 7 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/31/2008 18:00 - 22:30 4.50 CASE N CEMT INT1 22:30 - 23:00 0.50 CASE N CEMT INT1 23:00 - 00:00 1.00 WHSUR N CEMT INT1 6/1/2008 00:00 - 02:30 2.50 WHSUR N CEMT INT1 02:30 - 03:30 1.00 I CASE I N CEMT I INT1 03:30 - 07:00 ~ 3.50 ~ CASE ~ N ~ CEMT ~ INT1 07:00 - 12:30 ~ 5.50 ~ CASE ~ N ~ CEMT ~ INT1 12:30 - 13:00 0.50 CASE N CEMT INT1 13:00 - 16:30 3.50 CASE N CEMT INTi 16:30 - 17:30 1.00 CASE N CEMT INT1 17:30 - 19:00 1.50 CASE N CEMT INT1 19:00 - 23:00 I 4.00 I CASE I N I CEMT ~ INT1 23:00 - 00:00 1.00 CASE N CEMT INT1 6/2/2008 00:00 - 02:15 2.25 CEMT N CEMT INT1 -Begin to trip out of the hole from 5591' to 108' -Up Wt. 140k Down Wt. 80k -No change in retums until after sweep passed over shakers then the returns stopped. Lay down BHA # 25 -Clean and clear floor Pull Wear ring and then install the test plug Change out Rams from 3 1/2" x 6" Vari to 7 5/8" -Test upper rams with test joint to 250 psi low / 3500 psi high -Good test Rig down test equipment and clear floor. -Rig up casing equipment and prepare to run 7 5/8" casing for the second time. -350 Ton Elevators, scaffolding, and casing tongs PU and RIH with 7-5/8" 29.7# L-80 BTC-M shoe track and check floats -holding. Continue PU and RIH with 7-5/8" 29.7# L-80 BTC-M casing to 1215', utilizing BOL 2000 NM thread lubricant and torqued to the mark with 9,000 ft-Ibs. Filled every joint with the fillup tool and broke circulation for 5 minutes every 10 joints while running in the hole. Continue to PU and run 7 5/8" 29.7# L-80 Vam Top casing from 1215' to 2988'. -Torque Turned to 14450 ft /Ibs and doped with Jet Lube Seal Guard. -Circulater for 5 minutes every 10 joints and record the up and down wt. -Up Wt. 120k Down Wt. 93k Circulate a bottoms up ~ 2988' -98 SPM ~ 291 gpm , 400 psi Continue in the hole with 7 5/8" Casing to 4230' -Up Wt. 175k Down Wt. 110k Stopped running casing in the hole in order to change out the cup on the franks tool. Also, took this time to clean the floor. Continued to run in the hole with 7 5/8" casing to 4430' -Circulated a bottoms up -98 spm ~ 291 gpm , 433k psi -Up Wt. 175k Down Wt. 110k Continue to run in the hole with 7 5/8" casing to 5552' -Rigged down franks tool and casing equipment -Made up landing joint to hanger and ran in hole and landed casing ® 5582' Circulated 2 bottoms up in order to prepare for cement job. -Clean mud coming back over shakers -Up Wt. 210k Down Wt. 115k 7 5/8" Casing Cement Job -Pump 5 bbls of water ®5 bpm -Pressure test lines to 3500 psi -Pump 50 bbls of 12ppg Mud Push ®5 bpm -Drop Bottom Plug -Kick out plug with 82 bbls of 15.8 ppg cement -Drop top plug -Kick out plug with 5 bbls from Dowell gp Page 8 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: I Date From - To Hours Task Code NPT Phase Description of Operations 6/2/2008 00:00 - 02:15 2.25 CEMT N CEMT INT1 -Displace with 248 bbls from the rig pumps. -Plug bumped ~ 3440 strokes 02:15 - 02:45 0.50 CASE P INT1 Pressured up to 3500 psi to pressure test casing for 30 minutes -Good test 02:45 - 04:30 1.75 CEMT P INT1 Blowdown surface lines. Rig down cement head and lines. Laydown landing joint. Change out bales. 04:30 - 05:30 1.00 CASE P INT1 Set pack-off and test to 5000 psi for 10 minutes. Good Test 05:30 - 06:30 1.00 CASE P INT1 Rig up 2nd Kill line in order to perform injection test. -Pumped 10 spm for a total of 4 bbls ~ 440 psi 06:30 - 08:30 2.00 WHSUR P INT1 Change out rams from 7 5/8" to 3.5" x 6" Vari -Install test plug and make up 4" Test Joint -Test rams with the 4" test joint to 250 psi low / 3500 psi high -Good Test -Pull Test plug and test joint -Install 7" ID Wear Ring 08:30 - 09:30 1.00 CASE P INT1 Service Top Drive -Grease and adjust 09:30 - 13:00 3.50 DRILL P PROD1 Pick up BHA # 26. Load Nukes and then run in to 242' 13:00 - 14:00 1.00 DRILL P PROD1 Single in drill pipe from 242' to 1197' 14:00 - 14:30 0.50 DRILL P PROD1 Shallow test MWD ..Good test -118 spm ~ 290 gpm and 955 psi 14:30 - 17:30 3.00 DRILL P PROD1 Continue to single in the hole from 1197' to 3873' -Injecting 118 bbls of LSND mud down the OA -ICP 530 psi ~ .6 bpm -FCP 840 psi ~ 2 bpm 17:30 - 19:00 1.50 DRILL P PROD1 Continue to single into the hole from 3873'to 5302' -Rig up Little Red Hot Oil Services -Freeze Protect OV to 2500' MD with 100 bbls of dead crude -ICP 700 psi ~ .6 bpm -FCP 1500 psi ~ 2 bpm -SIP 600 psi 19:00 - 20:00 1.00 DRILL P PROD1 Clean and clear rig floor -Lay down 3rd party tools (source box) 20:00 - 22:00 2.00 DRILL P PROD1 Cut and slip 85' of drilling line 22:00 - 23:00 1.00 DRILL P PROD1 Service top drive, adjust brakes, 23:00 - 00:00 1.00 DRILL P PROD1 Install TIW valve and IBOP and prepare for a stripping drill 6/3/2008 00:00 - 01:00 1.00 DRILL P PROD1 Meeting with crew to discuss upcoming stripping drill Perform stripping drill 01:00 - 03:30 2.50 DRILL P PROD1 Change out swivel packing on top drive 03:30 - 04:00 0.50 DRILL P PRODi Pull up to retrieve IBOP and TIW out of string Test Swivel Packing 04:00 - 05:30 1.50 DRILL P PROD1 Displace from seawater to VersaPro MOBM 9.3 ppg -6.5 BPM ~ 1,848 psi, 15 RPM ®initial 5.4 Kft/Ibs -final 3.1 Kft/Ibs. -Clean out pits and mud system 05:30 - 07:30 2.00 DRILL P PROD1 Wash down from 5,302' to 5,483', tag cement, Drill Shoe track and 20' of hole to 5,611' for FIT -Float collar on depth at 5,498' and shoe at 5,582' -6.5 BPM ~ 2,132 psi off, 2,370 psi on bottom, 30 RPM ~ 3.9 KfUlbs off, 4.3 Kff/Ibs on bottom -PUW 135, SOW 80, RWT 96K, WOB 5-10K 07:30 - 08:00 0.50 DRILL P PROD1 Circulate bottoms up and obtain slow pump rates Printed: 7/23!2008 2:28:44 PM i +~ BP Operations Summary Report Page 9 of 30 Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/3/2008 07:30 - 08:00 0.50 DRILL P 08:00 - 08:30 0.50 DRILL P 08:30 - 12:00 I 3.501 DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 16/4/2008 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 15:00 I 3.00 I DRILL I P 15:00 - 15:30 I 0.50 DRILL 1 P 15:30 - 20:00 I 4.501 DRILL I P 20:00 - 20:30 I 0.501 DRILL I P 20:30 - 00:00 I 3.501 DRILL I P 6/5/2008 100:00 - 09:30 1 9.501 DRILL ~ P PROD1 -6.8 BPM G~ 2,067 psi, 30 RPM ~ 3.2 Kft/Ibs PROD1 Pull back into the shoe at 5,498', Perform FIT to 11.5 ppg -TVD = 4,465' -MW = 9.3 -PSI = 520 PROD1 Directional drill from 5,611' to 5,778', slide as need to land in OBb -7.3 BPM ~ 2,360 psi off, 2,454 psi on, 30 RPM ~ 3-4 KfUlbs on and off bottom -PUW = 136, SOW = 80K, RWT = 96K, WOB = 5-10K -Control drill <320'/hr, survey every 30' PROD1 Directional drill from 5,778' to 7,013', Geosteer as per Geologist -Billet tanget from 5,884' to 6,102' -7.3 BPM ~ 2,480 psi off, 2,560 psi on, 60 RPM ~ 4 KfUlbs off, 4.5 Kft/Ibs on bottom -PUW = 120, SOW = 80K, RWT = 91 K, WOB = 5K -Control drill <320'/hr, survey every 30' PROD1 Directional drill from 7,013' to 8,055', Geosteer as per Geologist -7.3 BPM ~ 2,480 psi off, 2,645 psi on, 60 RPM ~ 5.5 Kft/Ibs off, 6.0 KfUlbs on bottom -PUW = 123K, SOW = 61 K, RWT = 90K, WOB = 0-10K -survey every 30' PROD1 Directional drill from 8,055' to 8,504', Geosteer as per Geologist -7.3 BPM ~ 2,600 psi off, 2,760 psi on, 60 RPM ~ 5.0 KWlbs off, 6.5 Kff/Ibs on bottom -PUW = 121 K, SOW = 68K, RWT = 91 K, WOB = 5K -survey every 30' PRODi Circulate as per Geologist -5.4 BPM ~ 1,572 psi -PUW = 117, SOW = 71 K PROD1 Directional drill from 8,504' to 8,953', Geosteer as per Geologist, TD at the end of the drillers polygon -7.3 BPM ~ 2,815 psi off, 2,910 psi on, 60 RPM ~ 6.4 Kffnbs off, 7.5 Kffnbs on bottom -PUW = 125K, SOW = 70K, RWT = 95K, WOB = 0-10K -survey every 30' PROD1 Circulate 1 open hole volume -7.3 BPM ~ 2,770, 60 RPM ~ 6.5 Kffnbs -MW in 9.4, MW out 9.4 -Monitor Well, well static PROD1 Back ream out to MADD Pass and clean well bore from 8,953' to 8,245' -7.3 BPM ~ 2,650 psi, 60 RPM ~ 5.5 KfUlbs -Max 600'/hr for logging PROD1 Back ream out to MADD Pass and clean well bore from 8,245' to 5,580' -7.3 BPM ~ 2,150 psi -60 RPM ®4.4 Kff/Ibs -Max 600'/hr for logging, 300'/hr for caliper data from 6,003' to 5,793' sensor depth F'flnt60: //L:i/ZWtl L:"Ltl:44 YM gp Page 10 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 9ES Date From - To I Hours Task Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 16/5/2008 00:00 - 09:30 9.50 DRILL P 09:30 - 11:00 1.50 DRILL P 11:00 - 12:00 1.00 DRILL P 12:00 - 14:30 2.50 DRILL P 14:30 - 15:30 I 1.001 DRILL ~ P 15:30 - 16:30 ~ 1.001 DRILL I P 16:30 - 23:00 I 6.501 DRILL I P 23:00 - 00:00 I 1.001 DRILL I P 16/6/2008 100:00 - 02:00 I 2.001 DRILL I P 02:00 - 03:30 I 1.501 CASE I P 03:30 - 09:00 5.50 ~ CASE P 09:00 - 12:30 3.50 CASE P 12:30 - 16:00 3.50 CASE P 16:00 - 16:30 0.50 CASE P 16:30 - 18:30 2.00 DRILL P 18:30 - 19:30 1.00 DRILL P 19:30 - 23:00 3.50 DRILL P 23:00 - 00:00 I 1.001 DRILL I P Phase Descriptjon of Operations PROD1 Work through tight spots at 6,340' and 6,080' PROD1 Circulate bottoms up at the shoe, substantial increase in cuttings, took 3 bottoms up to clean up casing. -7.3 BPM ~ 2,150 psi -60 RPM ~ 4.5 Kft/Ibs PROD1 Service top drive and adjust draw works linkage PROD1 Run in the hole from 5,580' to 8,901', no problems running in hole PROD1 Wash down from 8,901' to 8,953', circulate bottoms up prior to fluid swap -6.8 BPM ~ 2,526 psi -60 RPM ~ 5.3 Kft/Ibs PROD1 Displace well bore from VersaPro LS to VersaPro SF -6.8 BPM ~ 2,000 psi -60 RPM ~ 5.3 KfUlbs -MW in 9.4 ppg, MW out 9.4 ppg -Perform Slow Pump Rates PROD1 Monitor well, welt static. Pull 5 stands, no over pull or swabbing. Pump dry job and pull out of hole from 8,953' to 242', no problems pull out of hole. PROD1 PJSM on handling BHA and Source. Lay down jars, rack back collar stand, and pull source. PROD1 Continue laying down remaining BHA. -Bit 0-0 in gauge RUNPRD PJSM for running liner Rig up to run 4 1/2" liner, Swell Packer, and Aluminum Billet RUNPRD Run in hole with 4 1/2" liner (OBb Lateral) to 3,142' -IBT made up to mark, avg torque 2,800 fUlbs, use BOL 2000 dope -1 Joint 4 1/2" L-80 12.6# IBT Solid Liner with Shoe -63 Joints 4 1/2" L-80 12.6# IBT Slotted Liner, 1 centralizer per joint, free floating -12 Joints 4 1/2" L-80 12.6# IBT Solid Liner, 1 centralizer per joint on joints 1-11, free floating -3 Space out Pup joints 4 1/2" L-80 12.6# IBT Pups -1 Swell Packer assembly with Hydro Form Centralizer below Packer -20' Aluminum Billet with IBT Pup on bottom RUNPRD Run in the hole with 4 1/2" liner on 4" drill pipe out of derrick from 3,142'to 8,953' -PUW = 141 K, SOW = 78K -Pump 3.5 BPM ~ 881 psi to release from liner, top of billet at 5,813', shoe at 8,953' RUNPRD Pull out of the hole from 5,813'. RUNPRD Lay down Weatherford GS Spear and clean rig floor. PROD2 Make up BHA #27 as per Directional Driller -Rerun bit from BHA #26 -Load source -Run in hole 2 stands and stab safety valve PROD2 Rig Evacuation Drill PROD2 Run in hole with 4" drill pipe out of derrick from 478' to 5,534'. -Shallow hole test MW D at 1,147', good test PROD2 Waiting on mud sent to MI for centrifuging. Printed: 723/2008 2:28:44 PM gp Page 11 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6!7/2008 00:00 - 01:30 1.50 DRILL N PROD2 Waiting on mud for Displacement from VersaPro SF to VersaPro LS. NPT due to the availability of trucks. Waited 7 hrs on guzzler to empty cuttings box at MI mud plant. Also the efficiency that the rig ran the slotted liner did not allow sufficient time to recondition the MOBM. -New Crew watched oil base mud safety video. 01:30 - 02:30 1.00 DRILL P PROD2 Run in hole from 5,534' to 5,813', Tag billet at 5,818' 02:30 - 03:30 1.00 DRILL P PROD2 Displace wellbore from 9.4 ppg VersaPro SF to 9.3 ppg VersaPro LS -260 GPM ®initial 1,840 psi, final 1,630 psi -Trench while displacing wellbore, from 5,798' to 5,818' -Motor stalls everytime billet is tagged 03:30 - 06:30 3.00 DRILL P PROD2 Time drill for open hole sidetrack from 5,818' to 5,828' -Estimate 1' of billet drilled before sidetracking -260 GPM ~ 1,630 psi 06:30 - 08:00 1.50 DRILL P PROD2 Dress up trench and open hole sidetrack area -Slide up and down multiple times without rotation, no sign of billet -300 GPM ~ 2,220 psi 08:00 - 12:00 4.00 DRILL P PROD2 Directional drill from 5,828' to 6,204', Geosteer as per Geologist, base of OBc at 6,420' -survey every 30' -Back ream 60' -Control drill <300'/hr -305 GPM ~ 2,290 psi off, 2,510 psi on -60 RPM ~ 4.5 Kft/Ibs off, 5.6 Kff/Ibs on -PUW = 121 K, SOW = 76K, RWT = 94K, WOB = 0-20K 12:00 - 00:00 12.00 DRILL P PROD2 Directional drill from 6,204' to 7,210', Geosteer as per Geologist in OBc lateral -survey every 30' Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,540 psi off, 2,585 psi on -60 RPM ~ 5.9 Kft/Ibs off, 6.2 Kftnbs on -PUW = 135K, SOW = 75K, RWT = 95K, WOB = 0-20K 6/8/2008 00:00 - 12:00 12.00 DRILL P PROD2 Directional drill from 7,210' to 8,574', Geosteer as per Geologist in OBc lateral, silty at the top and concretions at the bottom, looking for good sand -survey every 30' -Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,530 psi off, 2,660 psi on -60 RPM ~ 6.1 Kftnbs off, 7.2 KfUlbs on -PUW = 135K, SOW = 70K, RWT = 95K, WOB = 0-10K 12:00 - 15:00 3.00 DRILL P PROD2 Directional drill from 8,574' to 8,990', Geosteer as per Geologist in OBc lateral, TD at the end of the Drillers. polygon -survey every 30' -Back ream 60' -Control drill <300'/hr -310 GPM ~ 2,600 psi off, 2,900 psi on -60 RPM ~ 6.3 KfUlbs off, 7.3 KfUlbs on -PUW = 145K, SOW = 70K, RWT = 95K, WOB = 0-10K 15:00 - 15:30 0.50 DRILL P PROD2 Circulate one open hole volume rnncea: iiesievues ceo:~ riw • • gp Page 12 of 30 Operations Surnmary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations 6/8/2008 15:00 - 15:30 0.50 DRILL P PROD2 -300 GPM ~ 2,730 psi -60 RPM ~ 6.2 KfUlbs 15:30 - 00:00 8.50 DRILL P PROD2 Back ream to clean well bore and MADD Pass for logs from 8,990' to 6,864' -600 FPH max -300 GPM ~ 2,485 psi -60 RPM ~ 5.6 KfUlbs 6/9/2008 00:00 - 03:00 3.00 DRILL P PROD2 Continue Back reaming to clean well bore and MADD Pass for logs from 6,884' to 5,928' keeping top stabilizer 25' below billet. No problems while back reaming. -600 FPH max, 300 FPH from 6,100' to 5,928' for caliper data over packer area. -300 GPM ~ 2,298 psi -60 RPM ®5.6 KfUlbs 03:00 - 04:00 1.00 DRILL P PROD2 Pull out of hole from 5,928' to 5,813', saw a 20K over pull on weight indicator, stop and try to go back down past 5,813'. Stack 15K but could not get past 5,813', pull up above billet and pump to check orientation of motor, motor oriented low side, shut down pumps and attempt to run in past 5,813' with no success. Pull out to the shoe at 5,583' without rotation or pumps. 04:00 - 05:00 1.00 DRILL P PROD2 Circulate until shakers clean up, took 3 bottoms up. -300 GPM ~ 2,400 psi 05:00 - 08:00 3.00 DRILL P PROD2 Service top drive, change out quill, change out dies in grabber, and adjust draw works brake. -Monitor well, well static 08:00 - 11:00 3.00 DRILL P PROD2 Pump dry job and pull out of hole. 11:00 - 12:30 1.50 DRILL P PROD2 Lay down BHA #27 as per Directional Driller 12:30 - 13:00 0.50 DRILL P PROD2 Clear rig floor and bring up components for BHA #28 13:00 - 13:30 0.50 DRILL P PROD2 Make up clean out BHA #28 with mill for dressing billet area. 13:30 - 16:30 3.00 DRILL P PROD2 Run in hole to shoe, ease out into open hole and tag up twice on cuttings beds. Had to wash down with rotation from 5,760' to 5,765'. 16:30 - 18:00 1.50 DRILL P PROD2 Shut down pumps and attempt to slide past billet, taking weight at 5,815', pick up and wash down past billet to 5,830' without rotation. Rotate and pump to dress from 5,815' to 5,828' with watermellon mill. -200 GPM ~ 730 psi -60 RPM ~ 5.6K -PUW = 125K, SOW = 80K, RWT = 95K -Shut down pumps and work through billet area dry with no problems three times. -No metal debris in bottoms up. 18:00 - 21:00 3.00 DRILL P PROD2 Decide to run to bottom and perform displacement. Appears mill is pushing something ahead of it, wedged at 7,325'. Tried to circulate down with no success, took rotation and 25 Klbs to get obstruction moving again. Run in hole taking weight intermittently. 21:00 - 22:00 1.00 DRILL P PROD2 Circulate bottoms up prior to displacing wellbore to SFMOBM -400 GPM ~ 3,100 psi -60 RPM ~ 5.6 Kft/Ibs -Reciprcate pipe 70' -Shakers clean after 1 bottoms up. Printed: 7/23/2008 2:28:44 PM • ~ gp Page 13 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/9/2008 22:00 - 00:00 2.00 DRILL P PROD2 Displace wellbore from 9.3 ppg VersaPro LS to 9.3 ppg VersaPro SF -400 GPM ~ 3050 psi -60 RPM ~ 6.0 KfUlbs -Reciprocate Pipe 70' -MW in 9.3 PPg. MW out 9.3 PP9 6/10/2008 00:00 - 02:30 2.50 DRILL P PROD2 Pull out of hole from 8,990' to 5,835' without any problems. 02:30 - 03:00 0.50 DRILL P PROD2 Pump out from billet at 5,835' to shoe at 5,583'. -301 GPM ~ 1,474 psi. 03:00 - 03:30 0.50 DRILL P PROD2 Circulate bottoms up at the shoe -414 GPM ~ 2,306 psi -MW in 9.3 ppg, MW out 9.3 ppg 03:30 - 05:30 2.00 DRILL P PROD2 Monitor well, well static -Pull out of hole from 5,583' to BHA 05:30 - 06:00 0.50 DRILL P PROD2 Lay down BHA #28 06:00 - 06:30 0.50 DRILL P PROD2 Clean and clear rig floor. 06:30 - 07:00 0.50 CASE P RUNPRD Rig up to run 4.5" Slotted/Solid Liner for OBc Lateral. 07:00 - 07:30 0.50 CASE P RUNPRD H2S Drill with all rig personnel and contractors on location. 07:30 - 12:00 4.50 CASE P RUNPRD PJSM. RIH with 4.5" 12.6# L-80 IBT slotted/solid Liner to 3215'. -Ave TO = 2800 tt-Ibs 12:00 - 12:30 0.50 CASE P RUNPRD Make up GS Spear and insert into Aluminum Billet. -Make up Billet to liner and RIH. 12:30 - 17:30 5.00 CASE P RUNPRD RIH with 4.5" liner on 4" DP. -145k Up Wt, 75k Dn Wt. 17:30 - 18:00 0.50 CASE P RUNPRD Tag bottom ~ 8890'. -Pick up 5' for pipe stretch and pump ~ 4 bpm, 1100 psi to release aluminum billet ~ 5751'. -Good indication that spear released from billet - 125k Up, 75k Dn. 18:00 - 22:00 4.00 CASE P RUNPRD POH to shoe ~ 5580'. -CBU ~ 250 gpm, 2100 psi. -Pump dry job and POH to surface. -Lay down GS Spear. 22:00 - 22:30 0.50 CASE P RUNPRD Clean and clear rig floor. 22:30 - 00:00 1.50 BOPSU P PROD3 PJSM. Drain stack and pull wear ring. -Flush the stack with Johnny Whacker, then drain stack. -Rig up 4" Test Joint and plug for BOP test. 6/11/2008 00:00 - 00:30 0.50 BOPSU P PROD3 Continue rigging up to test BOPE. 00:30 - 06:00 5.50 BOPSU P PROD3 Test ROPE. -Test all BOP related equipment to 250 psi low / 3500 psi high. -Test lower 2-7/8" x 5" VBR, upper 3-1/2" x 6" VBR, and Annular with 4" test joint to 250 psi low / 3500 psi high. -Test lower and upper rams with 4.5" test joint 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Lou Grimaldi. Test Witnessed by WSL Mark Staudinger and NTP Roy Hunt. 06:00 - 07:00 1.00 BOPSU P PROD3 Rig down and blown down all testing equipment. -Pull test plug and install wear ring. 07:00 - 09:00 2.00 DRILL P PROD3 Make up Drilling BHA #29 as per Directional Driller. -RIH with Flex Drill Collars and Jars to 287'. 09:00 - 09:30 0.50 DRILL P PROD3 RIH with BHA #29 to 1717'. 09:30 - 10:00 0.50 DRILL P PROD3 Shallow test MWD w/291 gpm, 1699 psi -good. 10:00 - 12:30 2.50 DRILL P PROD3 RIH with from 1717' to 5537'. rnncea: nesicuun [:[a:aa rm -Bp Qperations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Start: 5/21/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Page 14 of 30 Spud Date: 4/27/2008 End: 7/8/2008 Date From - To Hours Task Code NPT Phase Description of Operations 6/11/2008 10:00 - 12:30 2.50 DRILL P 12:30 - 14:00 1.50 DRILL P 14:00 - 15:00 1.00 DRILL P 15:00 - 00:00 I 9.001 DRILL I P 16/12/2008 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 23:30 11.501 DRILL P 23:30 - 00:00 6/13/2008 00:00 - 00:30 00:30 - 12:00 0.50 DRILL P 0.50 DRILL P 11.50 DRILL P 12:00 - 13:00 I 1.001 DRILL I P 13:00 - 13:30 0.50 DRILL P 13:30 - 14:30 1.00 DRILL P 14:30 - 15:00 0.50 DRILL N 15:00 - 00:00 9.00 DRILL N PROD3 -115k Up Wt, 87k Dn Wt. PROD3 Slip and cut 87' of drilling line. -Service top drive, crown, and drawworks brake linkage. PROD3 Make up top drive and displace from 9.3 ppg Solids Free Oil Based Mud to 9.3 ppg Low Solids OBM. -Displace ~ 300 gpm, 2620 psi, 60 RPM, 4.2k ft-Ibs TO. PROD3 Trench Aluminum Billet from 5751' to 5791'. Directional Drill ahead from 5791' to 6394'. -300 gpm ~ 2400 psi on / 2150 psi off -60 RPM with 6.2k ft-Ibs TO on / 6.Ok ft-Ibs TO off -WOB = 5-10k -125k Up Wt, 80k Dn Wt, 95k Rot Wt -Survey every 30' and backream 60' on connections.. PROD3 Continue directional drilling in OBd lateral from 6394' to 7780'. -Pumps ~ 300 gpm, 2734 psi on, 2620 psi off. -Rotary ~ 60 rpm with 6.9k ft-Ibs TO on, 6k ft-Ibs TO off. -WOB = 5-10k lbs. -125k Up Wt, 65k Dn Wt, 90k Rot Wt -Survey every 30', Backream 60' on connections. -MW in and out = 9.3 ppg. PROD3 Continue directional drilling in OBd lateral to TD ~ 8965' MD (4482' TVD). -Pumps ~ 300 gpm, 2800 psi on, 2750 psi off -Rotary ~ 60 rpm with 6.8k ft-Ibs TO on, 6.3k ft-Ibs TO off. -WOB = 5-10k lbs. -145k Up Wt, 75k Dn Wt, 95k Rot Wt -Survey every 30', Backream 60' on connections. -MW in and out = 9.4 ppg. PROD3 CBU ~ 300 gpm, 2730 psi. -60 rpm ~ 6.4k ft-Ibs TO. PROD3 CBU ~ 300 gpm, 2730 psi. -60 RPM ~ 6.4k ft-Ibs TO PROD3 Backream and MAD Pass from 8965' to 5863' at 600 fph. -MAD Pass ~ 300 fph for Density Data as per Geologist (8131' to 8031', 7631' to 7531', and 5963' to 5863') -300 gpm ~ 2500 psi. -60 rpm ~ 6k ft-Ibs TO -143k Up Wt, 69k Dn Wt, 95k Rot Wt -Pull inside shoe ~ 5580' PROD3 CBU X2 ®310 gpm, 2200 psi. -Rotate ~ 60 rpm, 4.4k ft-Ibs TO -Reciprocate pipe 90' strokes. -145k Up Wt, 90k Dn Wt, 95k Rot Wt PROD3 Service Top Drive -Grease Wash Pipe PROD3 Orient Bit 140 degrees left, RIH and work past billet ~ 5751'. -Did not hang up while RIH through billet and saw slight bobble on weight indicator while POH past billet. -Continue to RIH from 5880' to 6490'. -145k Up Wt, 75k Dn Wt -While RIH, Bearings failed on Electric Emalgo Brake. RREP PROD3 POH inside shoe to 5531' -Circulate across top of hole RREP PROD3 Prepare to remove and repair Emalgo Brake (Dyno-matic). Printed: 723/2008 2:28:44 PM gp Page 15 of 30 ~ Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/13/2008 15:00 - 00:00 9.00 DRILL N RREP PRODS -Spot Peak Crane Crew next to beaver slide. -Hold PJSM with Rig Crew, Pad Operator Dave Kindred, BP Safety Rep Allen Graff, WSL Mark Staudinger, NAD Safety Rep Mark Mosbrucker, NTP Brian Tiedemann, and Peak Crane Crew Dan Abila and Barry Meek for the critical lift (Blind Lift) -Pick Emalgo Brake out of Drawworks and place in shop to replace bearings. 6/14/2008 00:00 - 12:00 12.00 DRILL N RREP PRODS Work on Emalgo Brake in Shop and found that bearings had welded to shaft. -Send Emalgo Brake to NOC Yard in Deadhorse for rebuild -Wait on replacement shaft and bearings -Clean and service top drive, housekeeping, clean inside drawworks, and change out leaking O-rings for top drive grabber while waiting. 12:00 - 00:00 12.00 DRILL N RREP PRODS Continue to wait on repair of Emalgo Brake ~ NOC Yard. -Replacement shaft shipped up from town. -Continue to service, clean, and organize rig while waiting. -CBU x1 ~ 2 bpm, 340 psi. 6/15/2008 00:00 - 09:00 9.00 DRILL N RREP PRODS Continue to Wait on Repairs to Emalgo Brake in NOC Yard. -Continue to service, clean, and organize rig. 09:00 - 16:30 7.50 DRILL N RREP PRODS Crane and rebuilt Emalgo Brake arrived on location. -Spot crane and prep for critical lift (blind lift). -Hold PJSM with Pad Operator Dan Dacs, BP and NAD Safety Reps (Allen Graff and Mark Mosbrucker), WSL Tom Anglen, NTP Kelly Cozby, Peak Crane Crew, and Rig Crew. -Pick and install Emalgo Brake into Drawworks. -Function test all brakes - ok. 16:30 - 17:30 1.00 DRILL N RREP PRODS Make up Top Drive and place bit outside of shoe ~ 5900'. -CBU xi ~ 300 gpm, 2300 psi. -Orient bit ~ 140 degrees. 17:30 - 18:00 0.50 DRILL N RREP PRODS RIH slick from 5580' to 6100'. 18:00 - 19:30 1.50 DRILL P PRODS Continue to RIH slick to TD ~ 8965'. 19:30 - 20:00 0.50 DRILL P PRODS Make up top drive and wash last stand to bottom. -CBU x1 ~ 300 gpm, 2800 psi. -Rotate ~ 70 rpm, 5.2k ft-Ibs TO. -Reciprocate pipe 30' strokes. 20:00 - 22:00 2.00 DRILL P PRODS Displace well to 9.3 ppg SFMOBM ®300 gpm, 2900 psi. -Rotate ~ 70 rpm, 6.1 k ft-Ibs TO. -Reciprocate pipe 95' strokes -145k Up Wt, 85k Dn Wt, 95k Rot Wt. -Monitor Well -Static. 22:00 - 00:00 2.00 DRILL P PRODS Pump dry job and POH from 8965' to 6299'. -130k Up Wt, 80k Dn Wt. 6/16/2008 00:00 - 00:30 0.50 DRILL P PRODS Continue to POH slick from 6299' to shoe ~ 5582'. -Ran slow past billet ~ 5751' -good. -Monitor well ~ shoe -static. 00:30 - 03:30 3.00 DRILL P PRODS Continue to POH from 5582' to 229'. 03:30 - 06:00 2.50 DRILL P PRODS PJSM. Lay down BHA #29. 06:00 - 06:30 0.50 DRILL P PRODS Clean and clear rig floor. 06:30 - 08:00 1.50 CASE P RUNPRD Rig up to run 4.5" OBd Lateral Liner. 08:00 - 12:00 4.00 CASE P RUNPRD RIH with 4-1/2" 12.6# L-80 Slotted BTC /Solid IBT Liner as per running detail to 1141'. rnntea: irz:trtuuts e:zts:aa rnn BP Page 16 of 30 I Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 16/16/2008 108:00 - 12:00 4.00 I CASE I P 12:00 - 16:30 I 4.501 CASE P 16:30 - 17:00 0.50 CASE P 17:00 - 22:30 5.50 CASE P 22:30 - 00:00 1.501 CASE P 16/17/2008 100:00 - 01:00 1.001 CASE P 01:00 - 03:00 I 2.001 CASE I P 03:00 - 04:00 1.00 CASE P 04:00 - 06:30 2.50 EVAL P 06:30 - 09:00 I 2.501 EVAL I P 09:00 - 09:30 0.50 EVAL P 09:30 - 10:30 1.00 EVAL P 10:30 - 14:30 I 4.001 STWHIPI P 14:30 - 16:30 I 2.001 STWHIPI P Phase ~ Description of Operations RUNPRD -Use BOL 2000 Dope. Ave TO = 2800 ft-Ibs. -RIH ~ 90 fpm RUNPRD Continue to RIH with 4-1/2" 12.6" L-80 Slotted/Solid and 13Cr-80 Vam Top Liner as per detail to 3872'. -Reduce running speed to 60 fpm due to mud flowing up Liner. -Use BOL 2000 dope on BTC/IBT and Jet Lube Seal Gaurd on Vam Top -TO BTC/IBT to 2800 ft-Ibs. TO Vam Top to 4440 ft-Ibs. TO Hydril 563 to 6000 ft-Ibs. -Obtain PU and SO Wts every 25 joints. ', -Make up hanger and Liner Top Packer as per BOT Rep. -Liner Up Wt = 80k, Dn Wt = 70k. RUNPRD Rig down liner running equipment. RUNPRD Continue to RIH w/ 4.5" Liner on 4" DP from derrick ~ 60 fpm -Obtain PU and SO Wts every 10 stands. -110k Up Wt, 85k Dn Wt ~ 7-5/8" Shoe (5582') -RIH and tag bottom ~ 8965'. Pick up pipe strech + 9' to position liner in place. -150k Up Wt, 60k Dn Wt ®TD. RUNPRD Drop 1.75" Ball and pump down ~ 4 bpm. Slow to 2 bpm and bump ball on seat. -Pressure up to 1700 psi to set liner hanger and slack off 20k to confirm set -good. -Bleed off and pressure back up to 4000 psi to set Liner Top Packer. -Bleed off to release the running tool from packer. -Pick up 1', close rams, and pressure up backside to 2000 psi for 5 minutes to check LTP -good test. -Pick up and expose dog subs above LTP. Slack off and locate LTP ~ 5101' DPM. RUNPRD CBU x1 ~ 4 bpm, 500 psi. Monitor Well -Static. RUNPRD Pump Dry Job and POH from 5101' to Liner Running Tool, racking back 4" DP and HWDP. RUNPRD Lay down Liner Running Tools. Clean and clear rig floor. INT1 PJSM with SWS crew and rig crew. Spot and Rig up SLB Wireline Unit. -Make up USIT logging tools and function test - OK INT1 Log with USIT from 5090' to surface -TOC ~ 3670' -Cement stringers to 3028' INT1 Rig down logging tools and service top drive and crown. INT1 Clean and clear floor and prepare for running whipstock and mill assembly WEXIT PJSM, with Baker Rep, Schlumberger Crew, NAD Rig Crew, BP WSL Tom Anglen, and NAD Toolpusher Kelly Cozby -Make up and run in hole with Whipstock and Mill assembly to 842' -BHA made up to Baker and Schlumberger specifications. WEXIT RIH from 842'to 1100' -Shallow tested tools ~ 240 gpm ,830 psi -Good Test -Continued to RIH from 1100' to 5002' ~ 60 fUmin. -Orient whipstock f!3 -28 deg. left with TOW ~ 5002' Printed: 7/23/2008 2:28:44 PM BP Page 17 of 30 ~ Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES ~' Date From - To Hours Task Code NPT , Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Spud Date: 4/27/2008 End: 7/8/2008 16/17/2008 ~ 16:30 - 17:00 ~ 0.50 ~ STWHIP~ P 17:00 - 17:30 0.50 STWHIP P 17:30 - 00:00 6.50 STWHIP P 6/18/2008 ~ 00:00 - 03:00 ~ 3.00 ~ STW H I P ~ P 03:00 - 04:30 I 1.501 STWHIPI P 04:00 - 07:00 I 3.00 I STWHIPI P 07:00 - 09:00 I 2.00 STWHIPI P 09:00 - 10:30 I 1.501 STWHIPI P 10:30 - 12:00 I 1.501 STWHIPI P 12:00 - 13:00 1.001 STWHIPI P 13:00 - 16:30 I 3.501 STWHIPI P 16:30 - 00:00 7.50 DRILL P Phase Description of Operations WEXIT Make up pipe to top drive and fill pipe ~ 260 gpm, 1500 psi -Up Wt. 135k /Down Wt. 35k -Oriented to -28 deg left -Slack off 15k to shear anchor -Pick up 10k over and slack off 40k to shear bolt and find neutral point WEXIT Displace to 9.3 ppg oil base mud ~ 300 gpm , 1835 psi WEXIT Begin to mill with TOW @ 5002' -122 spm f~ 300 gpm, 1720 psi -80 RPM -Torque 5.6k WEXIT Continue to mill from 5015'to 5040' -132 spm ~ 323 gpm, 1846 psi -100 RPM -Torque 5k -Worked and wiped pipe past window with no snags -TOW 5002' /BOW 5015' WEXIT Circulate 2x bottoms up -Pump 50 bbl Super Sweep and circulated out -130 spm X320 gpm , 1820 psi -Returns did not increase and metal shavings were still minimal after sweep was circulated out -Monitored well -Static -Mud Wt In 9.1 ppg / Out 9.1 ppg WEXIT Pull out of hole from 5040' to 472'. -Up Wt. 118k /Down Wt. 98k -Mud Wt. In 9.3ppg /Out 9.3 ppg WEXIT Stand back 4 3/4" Drill Collars -Laydown the milling assembly -Upper Mill was in Gauge -Clean and clear floor WEXIT Pulled the wear ring and flushed out the stack. -Replaced the wear ring WEXIT Picked up BHA # 31 and began to run in hole BHA # 31 -6 3/4" Hyclog DSX146H -AIM POM -Bypass Sub -Float -MWD -NM Flex Drill Collars -Hydraulic Jars -HWDP WEXIT PJSM, with Schlumberger and NAD Rig Crew about radioactive sources -Continued to M/U BHA # 31 as per Schlumberger WEXIT Run in hole to 1100' -Shallow tested MWD -Good Test -Continued to Run in hole to 4942', oriented bit and worked through window.-No problems -Reamed from 5002' to 5025' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 5040' to 5634' gp Page 18 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/18/2008 116:30 - 00:00 I 7.501 DRILL I P 16/19/2008 100:00 - 12:00 ~ 12.00 I DRILL I P 12:00 - 00:00 I 12.001 DRILL I P 16/20/2008 100:00 - 10:30 I 10.501 DRILL I P 10:30 - 11:30 I 1.001 DRILL I P 11:30 - 12:00 I 0.501 DRILL I P 12:00 - 16:30 I 4.501 DRILL I P 16:30 - 17:30 I 1.001 DRILL I P PROD4 - 125 spm ~ 300 gpm , 2300 psi on / 2200 psi off -Torque 4.6k on / 4.2k off -WOB 0-5k -Up Wt. 120k /Down Wt. 75k /ROT Wt. 95k -Back Reamed 30' on every connection PROD4 Drill from 5634' to 6490' - 121 spm ~ 300 gpm , 2335 psi on / 2260 psi off -Torque 5.5k on / 5k off -WOB 5-10k -Up Wt. 111 k /Down Wt. 75k /ROT Wt. 90k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 6490' to 7719' - 125 spm ®300 gpm , 2340 psi on / 2200 psi off -Torque 6.5k on / 6.2k off -WOB 0-10k -Up Wt. 130k /Down Wt. 65k /ROT Wt. 93k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 Drill from 7719' to 8850' - 123 spm ~ 300 gpm , 2712 psi on / 2579 psi off -Torque 6.1 k on / 5.9k off -WOB 0-10k -Up Wt. 119k /Down Wt. 65k /ROT Wt. 89k -Back Reamed 30' on every connection -Survey taken every 30' -Mud Wt. In 9.3 ppg /Out 9.3 ppg -TD called ~ 8850' MD , 4314' TVD as per Geologist PROD4 Circulate and condition as per geologist for gas sample -123 spm ~ 300 gpm , 2599 psi -Torque 5.9k -RPM 60 -Monitor Well -static -Mud Wt. In 9.3 ppg /Out 9.3 ppg PROD4 MAD Pass from 8850' to 8760' -123 spm ~ 300 gpm , 2590 psi , 600 fph -Torque 5.3k -RPM 60 PROD4 MAD Pass from 8760' to 8046' -123 spm ~ 300 gpm , 2590 psi , 600 fph -Torque 5.6k -RPM 60 -Reduced running speed to 300 fph from 8046' to 7856' -Increased ann. pressure of 50-120 psi -Made 3 attempts ~ 7640' to ream with no success PROD4 Pumped 20 bbl hi-vis sweep -125 psm ~ 303 gpm , 2430 psi -Torque 5.3k -RPM 80 -Worked pipe from 7640' to 7700' -No increase in returns from hi-vis sweep Printed: 7/23/2008 2:28:44 PM • gp Page 19 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/20/2008 17:30 - 00:00 I 6.501 DRILL P 16/21/2008 100:00 - 08:30 I 8.501 DRILL I P 08:30 - 10:00 1.501 DRILL I P 10:00 - 12:00 2.00 DRILL P 12:00 - 13:30 1.50 DRILL P 13:30 - 15:00 1.50 DRILL P 15:00 - 16:00 1.00 DRILL P 16:00 - 17:00 1.00 I DRILL I P 17:00 - 22:00 I 5.00 I DRILL I P 22:00 - 00:00 I 2.001 DRILL P 6/22/2008 00:00 - 00:30 0.50 DRILL P 00:30 - 01:00 0.50 DRILL P 01:00 - 02:00 1.00 WHIP P PROD4 -MAD Pass from 7640' to 6670' -123 spm rte 301 gpm , 2340 psi , 50-200 fph -Torque 5.7k -RPM 80 -Annulus continues to show signs of packoff and increase in psi -Worked and reamed pipe -Reamed clean from 7505' to 6769' with 1 tight spot ~ 7000' PROD4 -MAD Pass from 6769' to 5700' -123 spm fib 301 gpm , 1930 psi , 300 fph -Torque 5k -RPM 60 / ROT 105k -From 5700' to 5045' no rotation -Had to work the pipe ~ 5400' due to tight spot -Continued to pull from 5045' to 4969' -Did not pump while pulling through window with no problems PROD4 Circulated 3 bottoms up ~ 4969' to clean up the hole -122 spm ~ 299 gpm , 1930 psi -Monitored well- static PROD4 Slip and cut 91' of drilling line -Serviced top drive, drawworks, and rotary table PROD4 Ran back in hole from 4969' to 5538' -Up Wt. 113k /Down Wt. 88k -MAD Pass from 5538' to 5422' without rotating -123 spm ~ 300 gpm , 2106 psi PROD4 Ran in hole from 5422' to 8763' PROD4 Fill pipe and washed to bottom from 8763' to 8850' -Ciculated a bottoms up -123 spm ®300 gpm , 2696 psi -RPM 80 Torque 5-6k PROD4 Displace mud system from 9.3 ppg LS MOBM to 9.2 ppg SF MOBM -123 spm ~ 300 gpm , 2726 psi -RPM 80 -Torque 6.4k PROD4 Monitor Well -Static -Pumped dry job -Began to pull out of the hole from 8850' to 4969' -Up Wt. 132k /Down Wt. 74k -Monitored well ~ window -static -Continued to pull from 4969' to 288' -Mud Wt. In 9.2 ppg /Out 9.2 ppg PROD4 Laydown BHA # 31 -Stand back Jars -PJSM with Schlumberger,NAD Rig Crew, NAD Tourpusher, and BP WSL about removal of Radioactive Sources. -Laydown Flex Collars PROD4 Finish laying down BHA # 31 -Bit was in gauge and in good condition PROD4 Clean and clear floor of Schlumberger tools and prepare to run Whipstock Retrieval tool RUNPRD Pick up BHA # 32 and run in hole to 381' Prinletl: 7rz3/zW6 z:Ztl:44 F'M • gP Page 20 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/22/2008 01:00 - 02:00 1.00 WHIP P RUNPRD -Whipstock Retrieval Tool -Magnet -HWDP -Float Sub -MWD -Bumper Sub -Jars -Drill Collars -Cross Over 02:00 - 05:00 3.00 WHIP P RUNPRD Run in hole from 381' to 4980' -Up Wt. 115k /Down Wt. 85k -Oriented Whipstock Retrieval Tool -Ran in from 4980' to 5010' -Indicator of hooking whipstock ~ 5007' -Up Wt. 125k /Down Wt. 85k -Over pull of 95k to release bottom trip anchor -Pull out of the hole to 4966' 05:00 - 06:00 1.00 WHIP P RUNPRD Circulate 2 bottoms up ~ 4966' -119 spm ~ 291 gpm , 1605 psi -Pump Dry Job -Monitor Well- static -Mud Wt. In 9.3 ppg /Out 9.3 ppg 06:00 - 09:00 3.00 WHIP P RUNPRD Pull out of the hole from 4966' to 107' -Racked back the Drill Collars 09:00 - 11:00 2.00 WHIP P RUNPRD Continue to laydown the Whipstock Retrieval BHA -Whipstock showed wear of tracking right at the bottom, but was in good condition. Mill followed whipstock to the bottom for a full length window. -Debris found on magnet no more than 1 cup 11:00 - 12:30 1.50 WHIP P RUNPRD Layed down Baker tools ,clean and cleared the rig floor 12:30 - 13:30 1.00 CASE P RUNPRD Rig up to run 4 1/2" slotted /solid liner 13:30 - 21:00 7.50 CASE P RUNPRD PJSM, with NAD Rig Crew, Baker Rep., NAD Casing Crew -Make up 12.6# L-80 IBT/BTC slotted and solid liner with swell packers to the recommended torque of 3500 fUlbs using BOL 2000NM -Up Wt. 80k /Down Wt. 70k -Circulated 13 spm ~ 31 gpm , 86 psi 21:00 - 21:30 0.50 CASE P RUNPRD Rig down 4 1/2" liner running tools 21:30 - 22:30 1.00 CASE P RUNPRD Run 4 1/2" liner in on 4" drill pipe from 3850'to 4968' 22:30 - 00:00 1.50 CASE P RUNPRD Obtain Parameters for running bent joint into open hole -Up Wt 100k /Down Wt. 85k -Tagged No-Go at 5120' when attempting to exit window -Attempted 3 times 6/23/2008 00:00 - 00:30 0.50 CASE P RUNPRD Tagged No-Go ~ 5120' -Picked up to window and rotated the drillstring 1 3/4 turns -Went through window f~ 5015' -Continued to run in hole ~ 60 fph -Up Wt. 100k /Down Wt. 85k 00:30 - 04:00 3.50 CASE P RUNPRD Continued in hole 8840' -Hanger hooked casing ~ 4998' -on depth -Picked up and rotated 1/4 turn and ran to 8845' -Picked up and rotated 1/4 turn and ran to 8840' -hanger did not hook Printed: 7/23/2008 2:28:44 PM g p Page 21 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - Ta Hours Task ~ Code NPT Phase Description of Operations 6/23/2008 00:30 - 04:00 3.50 CASE P RUNPRD -Picked up and roated 1/4 turn and ran to 8840' -hanger hooked -Hanger hooked on depth ~ 4998' -Verified S/O wt. reduced from 75k before hooking to 35k after hooking -Up Wt 140k /Down Wt. 75k 04:00 - 04:30 0.50 CASE P RUNPRD Dropped ball to shear HR running tool -Ball seated ~ 808 strokes -Pressured up to 4300 psi ~ 1247 strokes when sheared -Picked up to 4944' and circulated bottom up -Up Wt. 120k 04:30 - 05:00 0.50 CASE P RUNPRD Pumped dry job - 81 spm ~ 198 gpm , 585 psi -Monitored well -static -Mud Wt In 9.3 ppg / Out 9.3 ppg -Pulled out of hole from 4944' to 4300' 05:00 - 08:30 3.50 CASE P RUNPRD -Continued to pull out of the hole from 4300' -Layed down the BHA 08:30 - 09:00 0.50 CASE P RUNPRD Clean and cleared floor of Baker Tools 09:00 - 10:00 1.00 TIEBAC P OTHCMP Rig up to run casing equipment for LEM # 1 run 10:00 - 13:00 3.00 TIEBAC P OTHCMP PJSM, with Baker Hands, NAD Casing hand, NAD Rig Crew, NAD Toolpusher and BP WSL. -Torque turn Vam Top to 4400 fUlbs and doped with Jet Lube Seal Guard -Rig up false floor and change out elevators -M/U LEM # 1 with EUE 23/8" work string -M/U 5 1/2" Hydril to 5500 fUlbs -Up Wt 40k /Down Wt. 40k 13:00 - 13:30 0.50 TIEBAC P OTHCMP Rig down casing equipment used to make up LEM # 1 13:30 - 16:30 3.00 TIEBAC P OTHCMP Run in hole from 216' to 4964' 16:30 - 17:30 1.00 TIEBAC P OTHCMP Slack off to 5060' -Up Wt. 123k /Down Wt. 90k -Pumped 52 spm ®127 gpm , 650 psi -Entered Seal Bore ~ 5132' -Pressure increase and down wt reduced to 83k ,Latch Up -Seals were located on depth ~ 5143' -Slack off to 50k, then pick up and unlatch ~ 160k; Relatch LEM. -Up Wt. 100k /Slack off Wt. 50k 17:30 - 18:00 0.50 TIEBAC P OTHCMP Drop 1 3/4" ball to seat -2 bpm (~ 442 psi -Increase in psi up to 3100 -Hold -Increase to 4100 psi -set packer and release running tool -Pressure Test 7 5/8" annulus to 1500 psi for 5 minutes- good test -Pick up to 5060' and monitor well -static -Pumped dry job and blow down lines -LEM latched ®4945' 18:00 - 21:00 3.00 TIEBAC P OTHCMP Pull out of the hole from 5060' to 216' 21:00 - 23:00 2.00 TIEBAC P OTHCMP Laydown LEM running tool and 2 3/8" EUE work string 23:00 - 00:00 1.00 TIEBAC P OTHCMP Rig down LEM running tools and clean and clear the floor 6/24/2008 00:00 - 02:30 2.50 STWHIP P WEXIT Make up and run in hole with Whipstock Assembly BHA -Anchor,magnet, whipstock slide, window mill, float sub rnniea: i~eaieuun cco:aa rm BP Page 22 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date ;From - To Hours Task Code NPT Phase Description of Operations 6/24/2008 00:00 - 02:30 2.50 STWHIP P WEXIT -Run in hole to 844' 02:30 - 03:00 0.50 STWHIP P WEXIT Shallow test the MWD tool- good test -107 spm ~ 262 gpm , 887 psi 03:00 - 04:00 1.00 STWHIP P WEXIT Run in hole from 844' to 2761' with Whipstock Assembly BHA 04:00 - 05:00 1.00 STWHIP P WEXIT Service rig -Grease top drive, drawworks, and crown 05:00 - 06:00 1.00 STWHIP P WEXIT Continue in hole from 2761' to 4895' 06:00 - 06:30 0.50 STWHIP P WEXIT Orient whipstock to -19 deg. -Up Wt. 120k /Down Wt. 85k -Slacked off 14k to set anchor - postive indication of setting -Slack off 35k to shear lug -positive indication of setting -Pick up 90k and rotate 14 rpm ,Torque 4k 06:30 - 07:30 1.00 STWHIP P WEXIT Displace to LSMOBM -114 spm ~ 279 gpm , 1630 psi -Mud Wt. In 9.2 ppg / Out 9.2 ppg 07:30 - 11:00 3.50 STWHIP P WEXIT Mill window for L4 -ROT 95k , WOB 1-3k , 60-95 rpm -Torque 4-5k -102 spm ~ 250 gpm , 1250 psi -TOW 4841' BOW 4853' 11:00 - 12:00 1.00 STWHIP P WEXIT Begin to kick off into formation from 4853' to 4875' -ROT 95k , WOB 1-3k, 100 rpm -Torque 4.6 - 7k -102 spm ~ 250 gpm , 1250 psi 12:00 - 14:00 2.00 STWHIP P WEXIT Circulate 2 bottoms up -103 spm ~ 250 gpm , 1238 psi -Pump 50 bbl Hi-Vis Sweep - No increase in cuttings -Monitor Well -Static -Mud Wt. In 9.2 ppg /Out 9.2 ppg 14:00 - 15:30 1.50 STWHIP P WEXIT Pull out of hole from 4841' to 744' -Up Wt. 120k /Down Wt. 90k 15:30 - 17:30 2.00 STWHIP P WEXIT Stand back HWDP and Drill Collars -Lay down Milling Assembly -Clean and Clear Floor -Both upper and lower mills were in gauge when pulled out of the hole. 17:30 - 18:30 1.00 BOPSU P WEXIT Pull wear ring and flush out BOP stack 18:30 - 19:00 0.50 BOPSU P WEXIT Make up 4" test joint, floor valve, and install test plug 19:00 - 00:00 5.00 BOPSU P WEXIT Test BOPE. -Test all BOP related equipment to 250 psi low / 3500 psi high. -Test lower 2-7/8" x 5" VBR, upper 3-1/2" x 6" VBR, and Annular with 4" test joint to 250 psi low / 3500 psi high. 6/25/2008 00:00 - 01:00 1.00 BOPSU P WEXIT Continued to BOP Test -Test lower and upper rams with 4.5" test joint 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Jeff Jones. Test Witnessed by WSL Blair Neufeld and NTP Brian Tiedemann. 01:00 - 02:00 1.00 DRILL P PROD5 Clean and Clear floor and prepare to make up BHA # 34 02:00 - 03:30 1.50 DRILL P PROD5 PJSM, with Schlumberger, Rig Crew, and NAD Toolpusher before picking up radioactive sources Make up BHA # 34 and run in hole to 288' -Hycalog SDX513M-A2 Bit Printed: 7/23/2008 2:28:44 PM • gP Page 23 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/25/2008 102:00 - 03:30 1.50 ~ DRILL ~ P 03:30 - 06:00 2.50 DRILL P 06:00 - 07:00 1.00 DRILL P 07:00 - 07:30 0.50 DRILL P 07:30 - 12:00 4.50 DRILL P 12:00 - 00:00 12.001 DRILL I P 6/26/2008 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P 12:00 - 23:00 I 11.001 DRILL I P 23:00 - 00:00 I 1.001 DRILL I P 6/27/2008 100:00 - 12:00 I 12.00 I DRILL I P 12:00 - 15:30 I 3.501 DRILL ~ P 15:30 - 17:30 I 2.001 DRILL I P PROD5 -Stabalizers -MW D -Drill Collars -Circ Sub -Jars -HWDP PROD5 Run in hole to 1240' and function test MWD -good test -Continue in the hole from 1240' to 4110' PRODS Service topdrive,crown, and drawworks. PROD5 Orient to highside at window. -Wash from 4860' to 4875', 267 GPM ®1810 psi. PROD5 Drill from 4875' to 5189'. -Up wt. 110k,down wt. SOk,rotating wt 90k. -60 RPM 3k torque off bottom,4-5k torque on bottom. -300 GPM, 2300 psi off bottom, 2440 psi on bottom. -Mud wt. in and out 9.2 ppg. PROD5 Drill from 5189' to 6527'. -Up wt. 115k,down wt. 76k,rotating wt 93k. -60 RPM 4k torque off bottom,5k torque on bottom. -300 GPM, 2390 psi off bottom, 2485 psi on bottom. -Mud wt. in and out 9.3 ppg. PROD5 Drill from 6527' to 7942'. -Up wt. 120k,down wt. 70k,rotating wt 95k. -60 RPM 4-5k torque off bottom,5-9k torque on bottom. -300 GPM, 2470 psi off bottom, 2520 psi on bottom. -Mud wt. in and out 9.4 ppg. -Survey every 30'. -Back ream 30' on connections. PROD5 Drill from 7942' to 8763'. -Up wt. 123k,down wt. 68k,rotating wt 91 k. -60 RPM 5k torque off bottom,5.5k torque on bottom. -300 GPM, 2600 psi off bottom, 2667 psi on bottom. -Mud wt. in and out 9.3 ppg. -Survey every 30'. -Back ream 30' on connections. PROD5 Circulate annular volume. -300 GPM ~ 2587 psi. -Record slow pump rates. -Monitor well,static. -Mud wt. in and out 9.3 ppg. -38 bblsVersa Pro lost (cuttings very wet off shakers) PROD5 Backream /MAD-PASS logging with LWD 8763'-5729' -300 GPM ~ 2539 psi -60 RPM, 6k torque ~ 600 FPH PROD5 Backream /MAD-PASS logging with LWD 5729'-5150' -300 GPM ~ 2539 psi -60 RPM, 6k torque ~ 600 FPH -Pull dry from 5150' to inside window. -Pull 20k over ®4877'(stabilizer in window) -Swabbing inside casing ~ 4830' -16 bbls mud lost to hole while logging. PROD5 Break circulation ~ 4830',stage pumps up to 300 GPM ~ 2065 psi. rnmea: nzsizwa t:za:~ rm • BP Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To i Hours ~ Task ~ Code ~ NPT 16/27/2008 115:30 - 17:30 I 2.001 DRILL I P 17:30 - 18:00 0.50 DRILL P 18:00 - 19:00 1.00 DRILL P 19:00 - 21:30 2.50 DRILL P 21:30 - 22:30 I 1.001 DRILL I P 22:30 - 00:00 I 1.501 DRILL P 16/28/2008 100:00 - 04:30 I 4.501 DRILL I P 04:30 - 06:00 I 1.501 DRILL I P 06:00 - 07:00 1.00 WHIP P 07:00 - 08:00 1.00 WHIP P 08:00 - 08:30 0.50 WHIP P 08:30 - 09:30 1.00 WHIP P 09:30 - 10:30 I 1.00 I WHIP I P 10:30 - 13:00 2.50 WHIP P 13:00 - 16:00 3.00 WHIP P 16:00 - 17:00 1.00 CASE P 17:00 - 00:00 7.00 CASE P 6/29/2008 100:00 - 00:30 I 0.50 I CASE I P Start: 5/21 /2008 Rig Release: 7/8/2008 Rig Number: Page 24 of 30 ~ Spud Date: 4/27/2008 End: 7/8/2008 Phase Description of Operations PROD5 -Circulate 4 x bottoms up to clean casing. -1st bottoms up 80% excess cuttings. -2nd bottoms up 40% excess cuttings. PROD5 Service topdrive,drawworks,crown & blocks. PROD5 Slip & cut 71' drilling line. PROD5 Run in hole from 4777'to 8671' -Wash down to 8763' 60 RPM,7k torque. -300 GPM ~ 2680 psi. PROD5 Circulate bottoms up 300 GPM ~ 2680 psi. -Rotate 80 RPM ~ 6.5k torque. PROD5 Displace well to 9.2 ppg SFMOBM -298 GPM X2750 psi. -80 RPM ~ 6.5k torque. -Record slow pump rates. -Monitor well,static. -Pump dry job. -Mud wt. in and out 9.2 ppg. PROD5 Pull out of the hole from 8763' to 4841' -Up Wt. 125k /Down Wt. 68k -Monitor well ~ window -static -Continued to pull from 4841' to 288' -Mud Wt. In 9.2 ppg /Out 9.2 ppg PROD5 Laydown BHA -Stand back Jars & Flex collars -PJSM with Schlumberger,NAD Rig Crew, NAD Tourpusher, and BP WSL about removal of Radioactive Sources. RUNPRD Make up whipstock retrieval assembly with HWDP and 9 drill collars. RUNPRD Run in hole to 1806' with "J" hook. RUNPRD Fill pipe,shallow test MWD, 269 GPM ~ 946 psi. RUNPRD Run in hole to 4841'. -Up wt 120k,down wt 85k RUNPRD Orient hook to 19 left and latch into whipstock. -Stage weight up to 80k overpull,pulledfree. -Pull whipstock 30' up hole and circulate bottoms up. -271GPM ~ 1452 psi. -Monitor well,static. - Mud weight in and out 9.3 ppg. RUNPRD POH with whipstock from 4841' to 107' RUNPRD Lay down Whipstock retrieval assembly. RUNPRD Rig up to run 4 1/2", 12.6#, L-80 slotted liner. RUNPRD Run 4 1/2", 12.6#, L-80, IBT liner. -BOL 2000 NM,torque to 3000 fUlbs. -RIH to 4015' Up wt 82k down wt 65k. -72 jts Slotted liner -18 jts. Solid liner -4 swell packers,7419',6915',5279',4925'. -88 Volant Hyroform centralizers free floating,8 locked down on swell packer pup joints. -Rig down casing equipment. -Break circulation. RUNPRD RIH from 4015' to window ~ 4841'. -Run in past window & tagged No-Go ~ 4863' Printed: 7/23/2008 2:28:44 PM gp Page 25 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 16/29/2008 100:00 - 00:30 00:30 - 03:30 03:30 - 04:30 6/30/2008 04:30 - 06:30 06:30 - 07:00 07:00 - 08:00 08:00 - 10:00 10:00 - 10:30 10:30 - 14:00 14:00 - 16:30 16:30 - 17:00 17:00 - 19:00 19:00 - 20:30 20:30 - 23:00 23:00 - 00:00 00:00 - 01:00 01:00 - 01:30 01:30 - 02:30 02:30 - 03:00 0.50 CASE P RUNPRD -Picked up to window and rotated the drillstring 1/2 tum -Went through window ~ 4841' -Continued to run in hole ~ 60 fph 3.00 CASE P RUNPRD Continued in hole 8763' -Missed hook, ran in to 8760' -Picked up and rotated 1/2 tum run in,hooked X4843' -Picked up and rotated 1/2 tum and ran to 8760 -hanger did not hook -Picked up and roated 1/2 tum and ran in to 8752' hooked -Hanger hooked on depth X4853 -Up Wt 140k /Down Wt. 72k 1.00 CASE P RUNPRD Dropped ball to shear HR running tool -Ball seated ~ 732 strokes -Pressure up to 2800psi to release. -Bleed off pressure,pick up 60' -Pressured up to 3400 psi to shear ball out. -Circulate bottoms up -Up Wt. 120k 2.00 CASE P RUNPRD Pumped dryjob -Monitored well -static -Mud Wt In 9.3 ppg / Out 9.3 ppg -Pull out of hole 0.50 CASE P RUNPRD Lay down liner running tool. 1.00 TIEBAC P OTHCMP Rig up to run LEM & inner string. 2.00 TIEBAC P OTHCMP Pick up & make up LEM assembly and inner string. 0.50 TIEBAC P OTHCMP Clear floor of casing equipment. 3.50 TIEBAC P OTHCMP Run in hole with LEM assembly to 4954' 2.50 TIEBAC P OTHCMP Wash down to 4959' -Set down,did not latch -Pick up and rotate 90 deg. -Set down,latched in. -Pick up to verify latch then set down to latch. -Drop ball & pump down to release running tool,set packer. -Ball on seat X588 stks, 3300 psi to set packer,3700 psi to release running tool. -Test Packer to 1500 psi.good test. -Pick up to 4571',circulate 176 GPM ~ 500 psi. -Monitor wellstatic, - Mud wt in and out 9.2 ppg. 0.50 TIEBAC P OTHCMP Service topdrive,crown, and drawworks. 2.00 TIEBAC P OTHCMP POH from 4571' to running tool. 1.50 TIEBAC P OTHCMP Service break and lay down running tool. 2.50 STWHIP P WEXIT Make up Whipstock BHA. 1.00 STWHIP P WEXIT Run in hole from 244' to 516'. 1.00 STWHIP P WEXIT Run in hole with whipstock from 518' to 1696'. 0.50 STWHIP P WEXIT Shallow pulse test MWD,281 GPM ~ 1705 psi. 1.00 STWHIP P WEXIT Run in hole with whipstock from 1696'to 4708'. -Up wt 124k down wt 90k 0.50 STWHIP P WEXIT Orient whipstock to 11 left of highside. -Tag up at 4783' and set anchor. -Shear off with 40k down . -TOW 4640' -BOW 4652' Printed: 723/2008 228:44 PM gp Page 26 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Ir Date From - To Hours i Task Code NPT Phase 16/30/2008 03:00 - 04:00 1.00 STWHIP P WEXIT 04:00 - 09:00 5.00 STWHIP P WEXIT 09:00 - 10:30 1.50 STWHIP P WEXIT 09:00 - 11:30 2.50 STWHIP P WEXIT 11:30 - 13:30 2.00 STWHIP P WEXIT 13:30 - 14:00 0.50 STWHIP P WEXIT 14:00 - 15:30 1.50 DRILL P PROD6 15:30 - 17:00 1.50 DRILL P PROD6 17:00 - 17:30 0.50 DRILL P PROD6 17:30 - 18:00 0.50 DRILL P PROD6 18:00 - 18:30 0.50 DRILL P PROD6 18:30 - 20:00 1.50 DRILL P PROD6 20:00 - 23:00 3.00 DRILL P PROD6 23:00 - 00:00 1.00 DRILL N SFAL PROD6 7/1/2008 00:00 - 00:30 0.50 DRILL N SFAL PROD6 00:30 - 01:30 1.00 DRILL N SFAL PROD6 01:30 - 02:30 1.00 DRILL N SFAL PROD6 02:30 - 12:00 I 9.501 DRILL I P I I PROD6 12:00 - 00:00 I 12.001 DRILL I P I I PROD6 17/2/2008 100:00 - 12:00 12.00 DRILL I P I I PROD6 12:00 - 17:30 I 5.501 DRILL I P I I PROD6 Description of Operations Displace system to LS MOBM. -284 GPM ~ 1640 psi. -Record slow pump rates. Mill window from 4640' to 4674'. -Work mills through window. Circualte Hi-Vis sweep. -280 GPM ~ 1455 psi. -Monitor well,static. -Mix & pump dry job. -Mud weight in and out 9.2ppg. -Record slow pump rates. POH from 4674' to 99'. Lay down milling assembly,mills in gauge. Clear floor of tools. PJSM, make up BHA #37 with motor, MWD, flex collars and jar to 287'. Run in hole from 287' to 1243'. Shallow pulse test MWD,296 GPM ~ 1400 psi. Service Topdrive,drawworks,and crown. Run in hole from 1243' to 4588'. Drill sliding from 4674' to 4776'. -Up wt 113k,down wt. 89k -286 GPM ~ 1900 psi.off bottom,2020 psi on bottom. -5k WOB Pull into window to trouble shoot MWD Attempted to continue drilling,washed out pop off valve. -Pull back into window Service rig change pop-off on #2 pump. MADD PASS log drilled section due to MWD surface problems while drilling. Drill from 4776' to 5378'. -300 GPM, 2159 psi off bottom, 2294 psi on bottom. -5-10k WOB ~ 40 RPM with 3-4k TO off, 3-4k TO on. -117k Up Wt, 79k Dn Wt, 103k Rot. -Mud wt. in and out 9.3 ppg. -Survey every 30'. -Back ream 30' on connections. Continue drilling from 5378' to 6616'. -300 gpm with 2295 psi off, 2480 psi on. -5-10k WOB ~ 60 RPM with 3-4k TO off, 5-6k TO on. -120k Up Wt, 76k Dn Wt, 96k Rot. -Mud Wt in and out = 9.2 ppg. -Survey every 30'. -Backream 30' on connections. Continue drilling Nb Lateral from 6616' to 7910'. -300 gpm ~ 2501 psi off, 2654 psi on -5-10k WOB with 60 RPM ~ 4.4k TO off, 5.8k TO on -139k Up Wt, 54k Dn Wt, 89k Rot -Survey every 30' -Backream 30' on connections. -MW in and out = 9.2 ppg Continue drilling from 7910' to TD ~ 8630'. -300 gpm ~ 2530 psi off, 2570 psi on Printed: 7/23/2008 2:28:44 PM i • g p Page 27 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code ~ NPT Phase Description of Operations 17/2/2008 12:00 - 17:30 I 5.501 DRILL I P I I PROD6 17:30 - 18:00 0.50 DRILL P PROD6 18:00 - 00:00 6.00 DRILL P PROD6 00:00 - 09:30 I 9.50 DRILL I P I I PROD6 09:30 - 10:30 1.001 DRILL P I PROD6 10:30 - 11:30 I 1.001 DRILL I P PROD6 11:30 - 12:30 1.00 DRILL P PROD6 12:30 - 15:30 3.00 DRILL N DFAL PROD6 15:30 - 16:30 1.00 DRILL N DFAL PROD6 16:30 - 17:30 1.00 DRILL N DFAL PROD6 17:30 - 18:00 0.50 DRILL N DFAL PROD6 18:00 - 19:30 1.50 DRILL N DFAL PROD6 19:30 - 21:00 1.50 DRILL P PROD6 21:00 - 22:00 1.00 DRILL P PROD6 22:00 - 00:00 2.00 DRILL P PROD6 7/4/2008 00:00 - 00:30 0.50 DRILL P PROD6 00:30 - 01:00 0.50 DRILL P PROD6 01:00 - 02:00 I 1.00 DRILL I P I PROD6 -5-10k WOB with 60 RPM ~ 4k TO off, 5.6k TO on -141 k Up Wt, 61 k Dn Wt, 94k Rot -Survey every 30' -Backream 30' on connections -MW in and out = 9.3 ppg. Circulate 1 open hole annular volume ~ 300 gpm, 2515 psi. MAD Pass from 8630' to 7058' ~ 600 fph. -Slow to 300 fph for Density Caliper Data in intervals as per Geologist -300 gpm ~ 2515 psi -60 RPM ~ 4k TO -95k Rot Wt Continue MAD Passing from 7058' to 5053' ~ 600 fph. -Ran into tight spot ~ 6790' to 6716', 5180' and 4994'. Worked through several times and broke free. -Slow to 300 fph for Density Caliper Data in intervals as per Geologist -300 gpm ~ 2300 psi -60 RPM ~ 4k TO -90k Rot Wt Pump out of hole from 5053' to 4745' due to sudden pressure loss down hole. Suspect washout in drillpipe. -200 gpm ~ 826 psi -60 rpm ~ 3.3k TO -120k Up Wt, 90k Dn Wt, 102k Rot POH with no pump or rotation from 4745' to 4397'. -115k Up Wt, 90k Dn Wt Service top drive and blocks. POH from 4397' to 194'. -Monitor well -static -Found circ sub washed out and open Lay down BHA #37. Clean and clear rig floor. Pick up Cleanout BHA #38 to 187'. RIH on 4" DP from 187' to 4625'. Attempt to circulate ~ 4625' and found drillstring packed off. Work string to unplug jets. Successfully able to establish cirulation. -CBU 3X ~ 404 gpm, 2245 psi. -95 rpm ~ 3.3k TO -118k Up Wt, 92k Dn Wt, 97k Rot Slip and cut 65' of drilling line. RIH from 4625' to 7334'. -120k Up Wt, SOk Dn Wt -No problems ~ 7-5/8" window (4640') -Took Weight ®4775', then broke free. Continue to RIH from 7334' to 8570'. Screw in Top Drive and wash down to 8630'. -No fill on bottom -CBU ®426 gpm, 3362 psi -60 rpm ~ 4.3k TO Displace wellbore to 9.3 ppg SFMOBM -400 gpm ~ 3340 psi rnntea: irtsrruua z:ztt:aa rM gp ' Page 28 of 30 Operations Summary Report Legal Well Name: L-205 Common Well Name: L-205 Spud Date: 4/27/2008 Event Name: DRILL+COMPLETE Start: 5/21/2008 End: 7/8/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To j Hours Task Code NPT Phase Description of Operations 17/4/2008 ~ 01:00 - 02:00 I 1.00 i DRILL I P 02:00 - 07:00 5.00 DRILL P 07:00 - 07:30 0.50 DRILL P 07:30 - 09:30 2.00 WHIP P 09:30 - 10:00 0.50 WHIP P 10:00 - 10:30 0.50 WHIP P 10:30 - 12:00 1.50 WHIP P 12:00 - 12:30 0.50 WHIP P 12:30 - 13:00 I 0.501 WHIP I P 13:00 - 15:30 2.50 WHIP P 15:30 - 16:00 0.50 WHIP P 16:00 - 17:30 1.50 WHIP P 17:30 - 18:30 1.00 WHIP P 18:30 - 19:00 0.50 CASE P 19:00 - 00:00 5.00 CASE P 17/5/2008 100:00 - 02:30 I 2.501 CASE I P 02:30 - 04:00 I 1.50 I CASE I P 04:00 - 06:30 I 2.50 I CASE I P 06:30 - 07:00 0.50 CASE P 07:00 - 07:30 0.50 CASE P 07:30 - 11:00 3.50 CASE P 11:00 - 11:30 0.50 CASE P 11:30 - 13:30 2.00 CASE P 13:30 - 15:00 1.50 CASE P 15:00 - 17:00 I 2.001 CASE I P 17:00 - 18:00 1.00 TIEBAC P 18:00 - 19:30 1.50 TIEBAC P 19:30 - 20:00 0.50 TIEBAC P 20:00 - 22:30 2.50 TIEBAC P PROD6 -60 rpm ~ 4.2k TO -Monitor Well -Static PROD6 Pump Dry Job and POH from 8630' to 187'. PROD6 Lay down Cleanout BHA #38 RUNPRD Pickup Whipstock Retrieval BHA and Drill Collars to 388'. RUNPRD RIH from 388' to 1343'. RUNPRD Test MWD ~ 259 gpm, 847 psi -good. RUNPRD RIH from 1343' to 4593'. RUNPRD Orient Whipstock Retrieval Tool 11 degrees left of highside -257 gpm ®1309 psi -Wash down to 4645' and hook into whipstock. -Stage up to 80k overpull and pull whipstock free. RUNPRD CBU ~ 335 gpm, 2013 psi -Monitor well -static RUNPRD Pump dry job and POH from 4645' to 388' RUNPRD Stand back DC's and lay down Whipstock Retrieval BHA. RUNPRD Lay down whipstock and whipstock space out assembly. RUNPRD Clean and clear rig floor. RUNPRD Rig up to run 4.5" Nb Slotted/Solid IBT Liner. RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid Nb Lateral Liner as per running detail. -Use BOL 2000 Pipe Dope -Ave TO = 3000 ft-Ibs -75k Up Wt, 64k Dn Wt 'RUNPRD Continue running in hole with 4.5" 12.6# L-80 IBT Slotted/Solid Nb Lateral Liner to 4640'. RUNPRD Attempt to exit window with lateral ~ 4640'. -Tagged bottom of OA Liner Top Tieback ~ 4800'. -Successfully able to exit window on 4th orientation. -108k Up Wt, 84k Dn Wt RUNPRD Continue to RIH with 4.5" liner on DP to 8618'. -Orient Hook hanger and set on fourth attempt. -132k Up Wt, 69k Dn Wt RUNPRD Drop 29/32" ball and pump on seat. -Release HR setting tool -shear seat ~ 4050 psi. RUNPRD CBU 1X ~ 250 gpm, 880 psi. -Monitor Well -Static RUNPRD Pump dry job and POH from 4560' to 35'. -Lay down hook hanger running tool assembly. RUNPRD Clean and clear rig floor. RUNPRD Pick up 3.5" Mule Shoe and XO. RIH on DP to 4636' RUNPRD Siab into Liner Top Packer Tieback (on LEM #2) and bottom out ~ 4795'. -CBU ~ 405 gpm, 1747 psi. -Monitor Well -Static RUNPRD Pump Dry Job and POH from 4795'. -Lay down 3.5" Mule Shoe OTHCMP Rig up to run 4.5" LEM #3 Assembly. OTHCMP Make up LEM #3 Assembly as per running detail. -Use Jet Lube Seal Guard on Vam Top connections -Ave TO = 4440 ft-Ibs. OTHCMP Rig down casing equipment. Clean and clear floor. OTHCMP RIH with LEM #3 Assembly on DP to 4636'. Printed: 7/23/2008 2:28:44 PM • • BP Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: L-205 L-205 DRILL+COMPLETE Start: 5/21 /2008 NABOBS ALASKA DRILLING I Rig Release: 7/8/2008 NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase 7/5/2008 22:30 - 00:00 1.50 TIEBAC P OTHCMP 7/6/2008 00:00 - 00:30 0.50 TIEBAC P OTHCMP 00:30 - 03:30 3.00 TIEBAC P OTHCMP 03:30 - 07:00 3.50 TIEBAC P OTHCMP 07:00 - 08:00 1.00 TIEBAC P OTHCMP 08:00 - 09:30 1.50 TIEBAC P OTHCMP 09:30 - 10:00 0.50 TIEBAC P OTHCMP 10:00 - 12:00 2.00 TIEBAC P OTHCMP 12:00 - 12:30 0.50 TIEBAC P OTHCMP 12:30 - 15:00 2.50 TIEBAC P OTHCMP 15:00 - 16:00 1.00 TIEBAC OTHCMP 16:00 - 16:30 0.50 TIEBAC P OTHCMP 16:30 - 17:00 0.50 TIEBAC P OTHCMP 17:00 - 17:30 0.50 BUNCO RUNCMP 17:30 - 19:00 1.50 BUNCO RUNCMP 19:00 - 22:30 3.501 RUNCOIV'P I I RUNCMP 22:30 - 00:00 1.501 RUNCON~P I RUNCMP 00:00 - 09:30 ~ 9.50 ~ RUNCOI~'P ~ ~ RUNCMP 09:30 - 12:00 ~ 2.50 ~ RUNCOI~P ~ ~ RUNCMP 12:00 - 12:30 ~ 0.50 ~ RUNCOI~'P ~ ~ RUNCMP 12:30 - 13:00 0.50 RUNCOIJ'P RUNCMP 13:00 - 15:00 2.00 BUNCO RUNCMP Page 29 of 30 Spud Date: 4/27/2008 End: 7/8/2008 Description of Operations RIH through hook hanger and sting into Seal Bore Extension. -Set down 30k and latch LEM into Hook Hanger. -Pickup 10k overpull to confirm latched in -good. -Drop 1.75" ball and pump onto seat. -Pressure up to 2000 psi to set Liner Top Packer. -Continue pressure up to 3500 psi to neutralize pusher tool. -Continue pressure up to 4000 psi to release running tool. Pressure Test Liner Top Packer to 1500 psi for 10 minutes - good. -Pull running tool above LTP and tag to confirm - ok. Displace wellbore from SFMOBM to 9.3 ppg Brine -250 gpm ~ 780 psi -Clean out under shakers and flush hole fill line -Blow down top drive and monitor well -static Lay down Drill Pipe from 4765' to 1230'. RIH with 4" DP stood back in derrick from 1230' to 4080'. Lay down DP from 4080' to 3020' Service top drive and drawworks Lay down DP from 3020' to 1230' RIH with 4" DP stood back in derrick from 1230' to 3236' Lay down DP from 3236' to HWDP Lay down 24 joints of HWDP and (9) 4-3/4" Drill Collars. Lay down Baker LTP Running Tool. Clean and clear rig floor. Pull wear ring and make dummy run with tubing hanger -good Rig up to run 4.5" 12.6# 13Cr-80 Vam Top Tubing. -Change out bails and RU compensator -Bring 1-Wire spool to floor and rig up PJSM. Run 4.5" 12.6# 13Cr-80 Vam Top Completion as per running detail. -Make up 4.5" Phoenix Gauge Carriers and splice in I-Wire. -Perform test on I-Wire splices -good Continue to run 4.5" Completion as per running detail. -Dope connections with Jet Lube Seal Gaurd -TO Tum to 4440 ft-Ibs Continue to run 4.5" 12.6# 13Cr-80 Vam Top Completion w/I-wire as per running detail. -Tag base of tieback ~ 4617' -Use Jet Lube Seal Gaurd Dope -MU TO =4440 ft-Ibs -Check I-wire integrity every 1000' -good. -PUW = 92k Ibs, SOW = 76k lbs. Space out completion and make up landing jt and hanger. -Terminate I-wire and test control line communication throught hanger to 5000 psi for 10 minutes -good. Land tubing hanger with bottom of tailpipe ®4612'. -RILDS and torque to 450 ft-Ibs -Ran 66 full I-wire clamps and 15 half I-wire clamps on tubing -Rig down casing equipment and clear floor. Rig up to reverse circulate and pump corrosion inhibitor. Reverse circulate 253 bbls clean 9.3 ppg brine, followed by 57 bbls corrosion inhibited brine, followed by 5 bbls clean brine ~ 3 bpm, 180 psi • , gp Page 30 of 30 Operations Summary'Report Legal Well Name: L-205 Common Well Name: L-205 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT Spud Date: 4/27/2008 Start: 5/21/2008 End: 7/8/2008 Rig Release: 7/8/2008 Rig Number: Phase Description of Operations 17/7/2008 115:00 - 15:30 I 0.50 15:30 - 19:00 I 3.50 19:00 - 19:30 I 0.501 RU 19:30 - 23:00 I 3.50 I RU 23:00 - 00:00 I 1.00 I BOPSUR P 17/8/2008 100:00 - 03:00 I 3.00) BOPSUR P 03:00 - 07:00 4.00 I WHSUR I P 07:00 - 08:00 1.00 WHSUR P 08:00 - 12:00 4.00 WHSUR P 12:00-13:00 I 1.001 WHSURIP 13:00 - 14:00 I 1.00 I WHSUR I P 'RUNCMP Drop ball and rod. -Back out and lay down landing joint -Close blind rams RUNCMP Pressure up and set packer with 4000 psi in tubing. -Attempt to hold for 30 minutes -surface equipment leaking. -Change out leaking bleeder valves -Blind rams leaking - PU and make up landing joint -Test tubing to 4000 psi for 30 minutes -good. -Bleed off to 2500 psi, then test annulus to 3500 psi for 30 mins -good. -Bleed off annulus, then tubing. -Pressure up backside and shear DCK Valve ~ 2180 psi. -Confirm circulation both ways through shear valve -good. RUNCMP Lay down landing joint and install TWC. -Test to 1000 psi from below -good. RUNCMP Clean out Oil Based Mud System. -Remove mats and rotary table cover -Clean OBM from around rotary table and clean all drains. RUNCMP Drain stack, pull riser, and remove turnbuckles. -Remove and drain mouse hole. RUNCMP Nipple down BOP stack and set back on stump. -Remove blind rams from stack to send back for inspection/repairs. -Blow down Choke and Kill Line -Change out long bails and prep floor for rig move RUNCMP Nipple up tree adapter flange. -Terminate I-wires, orient as per SLB, and check wire integrity. Test I-wire and adapter flange to 5,000 psi - OK. -Nipple up double master valves with stems toward driller side and test to 5000 psi for 5 min -good. RUNCMP RU DSM lubricator and pull TWC. -Rig up to freeze protect RUNCMP PJSM w/ Little Red. Rig up and pump 100 bbls of diesel down IA ~ 3 bpm, 1300 psi. -Allow diesel to U-tube. RUNCMP Rig down U-tube equipment. -Install BPV with DSM and test to 1000 psi from below. -Install VR plugs in annulus valves. -Rig down DSM. RUNCMP Remove double annulus valves, secure tree, and secure cellar. Release rig from operations on L-205 ~ 14:00 hrs on 7/8/08 Printed: 7/23/2008 2:28:44 PM by L-205L5 Su Report Schlumberger Report Date: 3-Jul-08 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 168.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: L-PAD / L-205 rvD Reference Datum: Rotary Table Well: L-205 TVD Reference Elevation: 76.10 ft relative to MSL Borehole: L-205L5 Sea Bed I Ground Level Elevation: 47.60 ft relative to MSL UWIIAPI#: 500292338863 Magnetic Declination: 22.864° Survey Name 1 Date: L-205L5 /July 3, 2008 Total Field Strength: 57656.257 nT Tort 1 AHD 1 DDI 1 ERD ratio: 318.333° f 5914.86 ft / 6.587 / 1.407 Magnetic Dip: 80.877° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: Juty 02, 2008 Location LaULong: N 70.35009145, W 149.32507882 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5978082.320 ftUS, E 583130.470 ftUS North Reference: True North Grid Convergence Angle: +0.63562040° Total Corr Mag North •> True North: +22.$64° Grid Scale Factor: 0.99990785 Local Coordinates Referenced To: Well Head L~ Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS Itlt u.uu u.uu v. uu -ie .-ru u. uv u. w uw u.uu v.uu u. uu u.vu aaraua~.a~ aas-rsu .4i rv ru. sowa-r4o vv -rwa.3~ouraaz GYD GC SS 100.00 0.57 217. 96 23 .90 100. 00 0. 32 0.50 0.50 -0.39 -0. 31 0.57 5978081. 92 583130 .17 N 70. 35009038 W 149.32508131 181.00 0.86 102. 64 104 .89 180. 99 0. 83 1.23 0.84 -0.84 0. 04 1.50 5978081. 48 583130 .52 N 70. 35008914 W 149.32507850 275.00 1.76 66. 92 198 .87 274. 97 0. 85 3.31 2.10 -0.43 2. 06 1.25 5978081. 91 583132 .53 N 70. 35009027 W 149.32506213 366.00 0.89 343. 53 289 .85 365. 95 -0. 12 5.10 3.24 0.79 3. 14 2.06 5978083. 15 583133 .60 N 70. 35009362 W 149.32505332 459.00 1.97 257. 97 382 .83 458. 93 -0. 84 7.07 1.79 1.15 1. 37 2.26 5978083. 49 583131 .83 N 70. 35009460 W 149.32506768 551.00 3.36 217. 40 474 .73 550. 83 0. 91 11.19 2.24 -1.32 -1. 81 2.46 5978080. 98 583128 .67 N 70. 35008785 W 149.32509353 644.00 5.70 201. 25 567 .44 643. 54 6. 55 18.49 9.33 -7.79 -5. 14 2.84 5978074. 48 583125 .42 N 70. 35007017 W 149.32512056 736.00 7.65 210. 60 658 .82 734. 92 14. 88 29.16 19.96 -17.32 -9. 92 2.42 5978064. 89 583120 .75 N 70. 35004413 W 149.32515931 835.00 8.60 223. 39 756 .83 832. 93 23. 93 43.09 33.79 -28.37 -18. 36 2.06 5978053. 75 583112 .43 N 70. 35001394 W 149.32522783 935.00 9.75 241. 75 855 .57 931. 67 30. 55 58.90 48.87 -37.81 -30. 95 3.13 5978044. 17 583099 .94 N 70. 34998814 W 149.32533 1035.00 13.48 249. 51 953 .51 1029. 61 34. 64 79.00 67.39 -45.91 -49. 34 4.04 5978035. 87 583081 .65 N 70. 34996604 W 149.3254 1115.00 16.16 253. 08 1030 .84 1106. 94 36. 98 99.46 86.43 -52.41 -68. 73 3.54 5978029. 16 583062 .33 N 70. 34994827 W 149.3256 MWD+IFR+MS 1136.89 16.70 254. 64 1051 .84 1127. 94 37. 42 105.65 92.23 -54.13 -74. 67 3.19 5978027. 37 583056 .41 N 70. 34994357 W 149.32568501 1258.24 22.93 265. 48 1165 .99 1242. 09 35. 36 146.66 130.09 -60.62 -115. 11 5.94 5978020. 43 583016 .05 N 70. 34992584 W 149.32601323 1326.92 24.06 268. 62 1228 .97 1305. 07 31. 04 174.03 155.35 -62.01 -142. 44 2.45 5978018. 74 582988 .74 N 70. 34992203 W 149.32623514 1421.68 27.17 270. 67 1314 .41 1390. 51 22. 73 214.99 193.67 -62.22 -183. 40 3.41 5978018. 07 582947 .79 N 70. 34992145 W 149.32656760 1516.50 30.08 271. 97 1397 .63 1473. 73 12. 25 260.41 236.83 -61.15 -228. 80 3.14 5978018. 64 582902 .38 N 70. 34992437 W 149.32693620 1611.33 32.06 273. 04 1478 .86 1554. 96 -0 .02 309.35 283.89 -59.00 -277. 69 2.17 5978020. 25 582853 .48 N 70. 34993025 W 149.32733307 1707.20 31.09 272. 76 1560 .53 1636. 63 -12 .93 359.55 332.65 -56.46 -327. 83 1.02 5978022. 23 582803 .32 N 70. 34993718 W 149.32774004 1801.84 32.49 272. 47 1640 .97 1717. 07 -25 .51 409.40 381.50 -54.19 -377. 63 1.49 5978023. 95 582753 .50 N 70. 34994338 W 149.32814434 1896.82 32.42 273. 61 1721 .12 1797. 22 -38. 74 460.37 431.61 -51.49 -428. 53 0.65 5978026. 09 582702 .58 N 70. 34995076 W 149.32855751 1992.43 33.98 273. 42 1801 .12 1877. 22 -52 .74 512.72 483.20 -48.28 -480. 78 1.64 5978028. 72 582650 .30 N 70. 34995951 W 149.32898168 2087.04 33.75 273. 91 1879 .68 1955. 78 -66 .97 565.44 535.28 -44.91 -533. 39 0.38 5978031. 50 582597 .66 N 70. 34996871 W 149.32940878 2181.62 33.61 271. 96 1958 .39 2034. 49 -80 .49 617.89 587.29 -42.22 -585. 77 1.15 5978033. 61 582545 .26 N 70. 34997604 W 149.32983395 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205\L-205L5\L-205L5 Generated 8/4/2008 11:08 AM Page 1 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft k ft ft de 1100 ft ftUS (ftUS Tie-In Survey MW D+IFR+MS Tie-In Survey TOW BOW Inc+Trend MWD+IFR+MS ZZ/4./4 33.3`J L/L.Ub LUJO .U4 2367.93 33.39 272.47 2113 .85 2462.46 33.02 270.42 2192 .94 2557.63 33.63 270.02 2272 .46 2651.46 33.98 270.29 2350 .43 2746.02 2842.54 2937.92 2967.43 3107.78 3203.61 3297.38 3392.05 3487.43 3582.92 3678.31 3772.61 3866.93 3962.10 4055.92 4150.19 4243.84 4339.08 4434.10 4527.38 4621.75 4640.00 4652.00 4674.00 4687.74 4718.72 4750.08 4782.14 4813.15 4845.33 4877.23 4909.06 4940.89 4973.33 5005.11 5035.85 5068.01 5100.12 33.40 33.47 33.60 33.62 31.53 31.04 30.81 30.68 31.05 30.87 29.99 29.22 28.77 29.80 30.62 33.73 36.39 38.26 40.45 43.34 46.89 47.73 49.73 51.06 52.60 56.04 60.16 64.37 68.55 72.98 76.54 80.77 85.09 87.94 89.76 93.32 96.66 99.36 270.56 270.62 270.76 270.56 273.30 273.04 272.91 272.74 272.49 268.82 263.26 254.87 247.68 240.93 236.90 229.21 222.26 217.52 214.68 211.09 207.11 205.92 205.31 205.31 205.10 L I IL. 14 2189.95 2269.04 2348.56 2426.53 2505.21 2585.76 2665.26 2689.84 2808.11 2890.00 2970.44 3051.81 3133.68 3215.57 3297.84 3379.86 3462.39 3545.41 3626.50 3706.32 3783.00 3858.75 3932.22 4001.66 4068.26 4080.63 4088.55 4102.57 4111.06 -~L.y'i OO~.LO OJO.Y I -105.59 720.57 689.44 -117.63 772.33 741.05 -128.70 824.62 793.26 -139.69 876.82 845.40 -150.98 929.27 897.79 -162.57 982.46 950.91 -174.14 1035.15 1003.54 -177.72 1051.48 1019.86 -195.86 1127.03 1095.24 -208.88 1176.80 1144.83 -221.34 1224.99 1192.88 -233.72 1273.38 1241.16 -246.06 1322.32 1289.99 -256.83 1371.43 1339.07 -263.61 1419.71 1387.28 -264.51 1466.23 1433.10 -259.19 1511.91 1476.73 -248.14 1558.42 1519.36 -232.69 1605.61 1560.98 -211.43 1655.75 -182.66 1709.50 -147.01 1767.22 -106.75 1827.47 -62.60 1889.74 -12.20 1956.58 -1.70 1969.99 5.44 1979.01 18.92 1995.96 27.53 2006.76 1602.91 1644.45 1686.06 1727.76 1769.46 1812.27 1820.58 1826.09 1836.46 1843.10 1858.62 1875.17 1892.95 1910.89 1930.19 204 .80 4053. 03 4129.13 47. 64 2031. 92 204 .50 4069. 60 4145. 70 68. 99 2058. 54 204 .20 4084. 51 4160. 61 91. 84 2086. 91 203 .90 4096. 90 4173. 00 114. 82 2115. 33 203 .38 4107. 49 4183 .59 139. 51 2145. 71 202 .72 4115. 88 4191 .98 164. 70 2176. 48 202 .11 4122. 14 4198 .24 190. 45 2207. 68 202 .45 4126. 06 4202 .16 216. 54 2239. 26 201 .35 4128. 03 4204 .13 243. 41 2271. 64 199 .36 4128. 67 4204 .77 270. 25 2303. 41 197 .56 4127. 84 4203 .94 296. 73 2334. 14 197 .08 4125. 04 4201 .14 324. 66 2366. 17 194 .52 4120. 57 4196 .67 352. 78 2397. 96 2429.11 2509.66 2589.16 2613.74 2732.01 2813.90 2894.34 2975.71 3057.58 3139.47 3221.74 3303.76 3386.29 3469.31 3550.40 3630.22 3706.90 3782.65 3856.12 3925.56 3992.16 4004.53 4012.45 4026.47 4034.96 1949.78 1969.67 1990.05 2011.07 2031.35 2050.45 2070.17 2089.38 -YV. YI -VJ/. IJ V.LJ Jul OV JY. VJ JVLYJJ. V~ -38. 37 -688. 37 0.22 5978036. 32 582442. 63 N 70. 34998655 W 149: 33066691 -37. 06 -740. 12 1.25 5978037. 06 582390. 88 N 70. 34999011 W 149. 33108697 -36. 86 -792. 40 0.68 5978036. 68 582338. 60 N 70. 34999064 W 149. 33151140 -36. 71 -844. 61 0.41 5978036. 24 582286. 40 N 70. 34999102 W 149. 33193518 -36. 33 -897. 06 0.63 5978036. 05 582233. 95 N 70. 34999206 W 149. 33236096 -35. 78 -950. 24 0.08 5978036. 01 582180. 78 N 70. 34999354 W 149. 33279266 -35. 14 -1002. 92 0.16 5978036. 06 582128. 09 N 70. 34999525 W 149. 33322037 -34. 96 -1019. 26 0.38 5978036. 06 582111. 76 N 70. 34999576 W 149. 33335297 -32. 46 -1094. 76 1.82 5978037. 72 582036. 24 N 70. 35000254 W 149. 33396588 -29. 71 -1144. 45 0.53 5978039. 92 581986. 53 N 70. 35001004 W 149. 33436924 -27. 21 -1192. 57 0.26 5978041. 89 581938. 38 N 70. 35001685 W 149. 334 -24. 82 -1240. 91 0.17 5978043. 74 581890. 03 N 70. 35002335 W 149. 7 3351 -22. 59 -1289. 79 0.41 5978045. 42 581841. 13 N 70. 35002942 W 149. 33554 -22. 03 -1338. 89 1.99 5978045. 45 581792. 03 N 70. 35003095 W 149. 33594771 -25. 33 -1387. 04 3.09 5978041. 61 581743. 92 N 70. 35002190 W 149. 33633860 -34. 11 -1432. 69 4.47 5978032. 33 581698. 38 N 70. 34999790 W 149. 33670912 -48. 74 -1475. 92 3.72 5978017. 22 581655. 32 N 70. 34995789 W 149. 33706007 -68. 93 -1517. 79 3.63 5977996. 56 581613. 68 N 70. 34990270 W 149. 33739992 -93. 31 -1558. 19 2.33 5977971. 74 581573. 56 N 70. 34983608 W 149. 33772781 -123. 54 -1598. 14 5.45 5977941. 07 581533. 95 N 70. 34975347 W 149. 33805210 -161. 11 -1636. 53 5.12 5977903. 08 581495. 98 N 70. 34965082 W 149. 33836367 -205. 42 -1673. 50 3.60 5977858. 37 581459. 51 N 70. 34952974 W 149. 33866370 -254. 11 -1708. 97 2.98 5977809. 29 581424. 59 N 70. 34939670 W 149. 33895148 -306. 43 -1742. 73 4.02 5977756. 61 581391. 41 N 70. 34925376 W 149. 33922543 -364. 85 -1775. 16 4.80 5977697. 83 581359. 63 N 70. 34909413 W 149. 33948862 -376. 86 -1781. 15 6.64 5977685. 77 581353. 78 N 70. 34906133 W 149. 33953720 -384. 99 -1785. 05 17.10 5977677. 59 581349. 97 N 70. 34903911 W 149. 33956883 -400. 31 -1792. 30 6.05 5977662. 19 581342. 89 N 70. 34899725 W 149. 33962762 -410. 09 -1796. 90 11.27 5977652. 37 581338. 40 N 70. 34897054 W 149. 33966 -432. 90 -1807. 51 11.13 5977629. 44 581328. 05 N 70. 34890821 W 149. 3397 -457. 09 -1818. 61 13.16 5977605. 13 581317. 22 N 70. 34884211 W 149. 33984110 -482. 94 -1830. 30 13.16 5977579. 15 581305. 81 N 70. 34877149 W 149. 33993599 -508. 89 -1841. 89 13.51 5977553. 07 581294. 52 N 70. 34870057 W 149. 34002995 -536. 72 -1854. 06 13.85 5977525. 12 581282. 65 N 70. 34862454 W 149. 34012876 -565. 04 -1866. 11 11.34 5977496. 67 581270. 92 N 70. 34854718 W 149. 34022649 -593. 88 -1878 .01 13.42 5977467. 70 581259. 34 N 70. 34846837 W 149. 34032299 -623. 11 -1889 .98 13.61 5977438 .35 581247. 69 N 70. 34838853 W 149 .34042013 -653. 15 -1902 .06 9.41 5977408. 18 581235. 95 N 70. 34830645 W 149. 34051808 -682. 93 -1913. 11 8.48 5977378. 27 581225. 24 N 70. 34822507 W 149. 34060772 -712. 07 -1922 .84 12.98 5977349 .03 581215. 83 N 70. 34814545 W 149. 34068663 -742. 65 -1932 .37 10.49 5977318 .35 581206. 64 N 70. 34806190 W 149 .34076398 -773. 24 -1941 .03 11.53 5977287 .67 581198. 32 N 70. 34797833 W 149 .34083419 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205\L-205L5\L-205L5 Generated 8/4/2008 11:08 AM Page 2 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 51:SU. US 7U'L .iSy 7y"L. /tS 4114. /y 5162. 33 105 .90 190. 46 4106. 77 5194. 15 106 .33 185. 79 4097. 93 5226. 31 104 .71 182. 81 4089. 32 5258. 52 105 .41 180. 68 4080. 95 5289. 59 105 .73 177. 49 4072. 61 5320. 14 106 .94 174. 36 4064. 02 5352. 05 106 .62 171. 54 4054. 80 5383. 88 105. 32 171. 61 4046. 05 5415. 23 101. 39 171. 29 4038. 81 5448. 22 99. 19 171. 62 4032. 91 5480. 01 96. 35 170. 36 4028. 62 5511. 39 92. 98 168. 38 4026. 07 5544. 00 89. 35 168. 34 4025. 40 5575. 40 88. 42 167. 69 4026. 01 5607. 01 88. 73 168. 36 4026. 80 5638. 91 89. 59 165. 59 4027. 27 5670. 66 89. 65 165. 48 4027. 48 5702. 51 90. 96 164. 15 4027. 31 5734. 13 91. 06 163. 77 4026. 75 5766. 48 90. 16 159. 99 4026. 41 5797. 45 91. 03 162. 65 4026. 08 5827. 16 90. 96 164. 32 4025. 57 5860. 31 89. 83 163. 21 4025. 34 5892. 77 90. 41 164. 45 4025. 27 5925. 05 90. 27 165. 14 4025. 08 5956. 35 89. 89 164. 05 4025. 04 5985. 16 89 .89 163. 18 4025. 09 6020. 79 89 .48 163. 16 4025. 29 6052. 13 87 .40 162. 20 4026. 14 6084. 05 88 .21 161. 97 4027. 36 6114. 52 89 .21 165. 04 4028. 05 6146. 37 89 .35 168. 07 4028. 45 6178. 31 88 .69 171. 06 4029. 00 6210. 60 88 .25 171. 32 4029. 86 6242. 09 86 .69 168. 89 4031. 25 6273. 70 87 .22 170. 11 4032 .93 6302. 29 90 .23 169. 13 4033. 56 6336. 35 89 .96 169. 30 4033. 51 6367. 92 89 .69 168. 86 4033. 60 6399. 98 90 .17 169. 98 4033. 64 6431. 99 90 .03 170. 21 4033 .59 41V~U .tSy 3/`J. 'Lb L4'L/ .33 Z1U6. b1 -tfU7./tS -ly4/ .`J6 73.7V ,y//Z~y.UO 9if"Ily"1./V N /V .34/yUVJC VV 14y.34Ui3yU4V 4182 .87 407. 89 2458 .59 2124. 15 -832. 39 -1954 .26 11.64 5977228.38 581185 .74 N 70 .34781672 W 149.34094148 4174 .03 436. 58 2489 .16 2140. 14 -862. 65 -1958 .58 14.16 5977198.08 581181 .76 N 70 .34773407 W 149.34097648 4165 .42 466. 32 2520 .14 2154. 89 -893. 54 -1960 .90 10.25 5977167.16 581179 .78 N 70 .34764967 W 149.34099524 4157 .05 496. 53 2551 .25 2168. 83 -924. 63 -1961 .85 6.75 5977136.07 581179 .18 N 70 .34756474 W 149.34100287 4148 .71 525. 90 2581 .18 2181. 32 -954. 55 -1961 .38 9.94 5977106.16 581179 .99 N 70 .34748300 W 149.34099894 4140 .12 554. 93 2610 .49 2192. 41 -983. 79 -1959 .29 10.60 5977076.95 581182 .39 N 70 .34740312 W 149.34098199 4130 .90 585. 36 2641 .04 2202. 85 -1014. 11 -1955 .54 8.52 5977046.68 581186 .48 N 70 .34732030 W 149.34095149 4122 .15 615. 91 2671 .64 2213. 00 -1044. 38 -1951 .06 4.09 5977016.46 581191 .30 N 70 .34723761 W 149.34091503 4114 .91 646. 35 2702 .14 2223. 42 -1074. 53 -1946 .53 12.58 5976986.36 581196 .17 N 70 .34715523 W 149.34087816 4109 .01 678. 75 2734 .60 2234. 92 -1106. 63 -1941 .70 6.74 5976954.32 581201 .34 N 70 .34706754 W 149.34083895 4104 .72 710. 20 2766 .09 2246. 22 -1137. 74 -1936 .77 9.76 5976923.28 581206 .62 N 70 .34698257 W 149.3407 4102 .17 741. 46 2797 .36 2257. 01 -1168. 47 -1931 .00 12.44 5976892.61 581212 .73 N 70 .34689861 W 149.34075195 4101 .50 774. 06 2829 .96 2268. 12 -1200. 40 -1924 .42 11.13 5976860.76 581219 .66 N 70 .34681139 W 149.34069850 4102 .11 805. 45 2861 .35 2279. 03 -1231. 11 -1917 .91 3.61 5976830.13 581226. 52 N 70 .34672750 W 149.34064553 4102 .90 837. 05 2892 .95 2290. 40 -1262. 02 -1911 .35 2.33 5976799.30 581233 .42 N 70 .34664306 W 149.34059225 4103 .37 868. 94 2924 .85 2301. 72 -1293. 09 -1904 .16 9.09 5976768.31 581240 .95 N 70 .34655818 W 149.34053384 4103 .58 900. 66 2956 .60 2312. 62 -1323. 83 -1896 .23 0.39 5976737.66 581249. 22 N 70 .34647420 W 149.34046941 4103 .41 932. 46 2988 .45 2323. 57 -1354. 57 -1887 .89 5.86 5976707.02 581257. 90 N 70 .34639023 W 149.34040164 4102 .85 963. 99 3020 .06 2334. 38 -1384. 95 -1879 .15 1.24 5976676.74 581266. 97 N 70 .34630723 W 149.34033067 4102 .51 996. 15 3052 .41 2344. 72 -1415. 69 -1869 .09 12.01 5976646.11 581277. 37 N 70 .34622327 W 149.34024897 4102 .18 1026. 91 3083. 38 2354. 71 -1445. 03 -1859 .18 9.04 5976616.90 581287. 61 N 70 .34614313 W 149.34016842 4101 .67 1056. 52 3113. 09 2365. 68 -1473. 51 -1850 .73 5.63 5976588.51 581296. 37 N 70 .34606534 W 149.34009983 4101 .44 1089. 58 3146. 23 2378. 45 -1505. 33 -1841 .46 4.78 5976556.80 581305. 99 N 70 .34597840 W 149.34002455 4101 .37 1121. 95 3178 .69 2391. 37 -1536. 51 -1832 .43 4.22 5976525.73 581315. 37 N 70 .34589324 W 149.33995112 4101 .18 1154. 18 3210. 97 2405. 07 -1567. 66 -1823 .96 2.18 5976494.68 581324. 18 N 70 .34580815 W 149.33988234 4101 .14 1185. 42 3242 .27 2418. 60 -1597. 83 -1815 .64 3.69 5976464.60 581332. 83 N 70 .34572571 W 149.33981480 4101 .19 1214. 15 3271 .08 2430. 90 -1625. 47 -1807 .52 3.02 5976437.05 581341. 26 N 70 .34565021 W 149.33974879 4101 .39 1249. 65 3306 .71 2446. 25 -1659. 57 -1797 .20 1.15 5976403.07 581351. 96 N 70 .34555705 W 149.33966 4102 .24 1280. 84 3338 .04 2459. 85 -1689. 48 -1787 .88 7.31 5976373.27 581361. 61 N 70 .34547536 W 149.3395 4103 .46 1312. 57 3369 .94 2473. 73 -1719. 83 -1778 .06 2.64 5976343.03 581371. 76 N 70 .34539245 W 149.33950 4104 .15 1342. 93 3400 .40 2487. 96 -1749. 03 -1769 .42 10.59 5976313.93 581380. 73 N 70 .34531267 W 149.33943932 4104 .55 1374. 77 3432 .25 2504. 62 -1780. 01 -1762 .01 9.52 5976283.05 581388. 48 N 70 .34522807 W 149.33937917 4105 .10 1406. 69 3464 .18 2523. 00 -1811. 41 -1756 .23 9.59 5976251.71 581394. 61 N 70 .34514228 W 149.33933217 4105 .96 1438. 91 3496 .46 2542. 59 -1843. 31 -1751 .29 1.58 5976219.87 581399. 90 N 70 .34505514 W 149.33929199 4107 .35 1470. 35 3527 .92 2561. 46 -1874. 29 -1745 .88 9.16 5976188.95 581405 .65 N 70 .34497049 W 149.33924806 4109 .03 1501. 90 3559 .48 2580. 37 -1905. 33 -1740 .13 4.20 5976157.98 581411 .75 N 70 .34488570 W 149.33920132 4109 .66 1530. 47 3588 .06 2597. 76 -1933. 44 -1734 .98 11.07 5976129.93 581417 .21 N 70 .34480891 W 149.33915948 4109 .61 1564. 52 3622 .12 2618. 54 -1966. 90 -1728 .61 0.94 5976096.55 581423 .95 N 70 .34471751 W 149.33910769 4109 .70 1596. 09 3653 .69 2638. 00 -1997. 90 -1722 .62 1.64 5976065.62 581430 .27 N 70 .34463283 W 149.33905910 4109 .74 1628. 14 3685 .75 2658. 14 -2029. 41 -1716 .74 3.80 5976034.18 581436 .51 N 70 .34454674 W 149.33901126 4109 .69 1660. 12 3717 .76 2678. 77 -2060. 95 -1711 .23 0.84 5976002.71 581442 .37 N 70 .34446059 W 149.33896652 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205\L-205L5\L-205L5 Generated 8/4/2008 11:08 AM Page 3 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de R R R R R R R de 1100 R RUS (RUS ) b4bJ. ViS y"I .Z3 1by A/ 4V33 .Yb 4"Ny .3D "Ib~J"1. "ly 3/4tS .iSb Zb`JiS. `J4 -LU`J"I AD -I NO. /8 4.3/ ba/aa/c. i/ ~a-i~wa.-ib rv /u sw+s/baa vv -i4a.33zsa~na 6494. 97 91 .51 170. 42 4032 .48 4108 .58 1723. 06 3780 .73 2719. 87 -2122 .95 -1700. 24 2.81 5975940. 84 581454.05 N 70 .34429122 W 149.33887717 6526. 79 90 .24 168. 95 4032 .00 4108 .10 1754. 86 3812 .55 2740. 85 -2154 .25 -1694. 54 6.10 5975909. 61 581460.09 N 70 .34420571 W 149.33883088 6558. 18 91 .03 166. 92 4031 .65 4107 .75 1786. 24 3843 .93 2761. 02 -2184 .94 -1687. 98 6.94 5975879. 00 581466.99 N 70 .34412187 W 149.33877758 6590. 17 91 .57 165. 80 4030 .92 4107 .02 1818. 21 3875 .92 2781. 12 -2216 .02 -1680. 44 3.89 5975848. 01 581474.88 N 70 .34403697 W 149.33871632 6621. 87 91 .47 165. 29 4030 .08 4106 .18 1849. 87 3907 .60 2800. 90 -2246 .70 -1672. 53 1.64 5975817. 41 581483.12 N 70 .34395314 W 149.33865207 6652. 84 91 .33 165. 78 4029 .33 4105 .43 1880. 80 3938 .56 2820. 43 -2276 .68 -1664. 79 1.65 5975787. 52 581491.19 N 70 .34387125 W 149.33858925 6685. 49 91 .20 164. 98 4028 .61 4104 .71 1913. 41 3971 .21 2841. 18 -2308 .27 -1656. 55 2.48 5975756. 04 581499.78 N 70 .34378496 W 149.33852233 6717. 45 91 .61 164. 06 4027 .82 4103 .92 1945. 30 4003 .16 2861. 33 -2339 .06 -1648. 03 3.15 5975725. 34 581508.65 N 70 .34370085 W 149.33845308 6748. 92 92 .06 164. 68 4026 .81 4102 .91 1976. 69 4034 .61 2881. 31 -2369 .35 -1639. 55 2.43 5975695. 15 581517.45 N 70 .34361811 W 149.33838425 6780. 02 92 .23 164. 37 4025 .65 4101 .75 2007. 71 4065 .69 2901. 32 -2399 .30 -1631. 26 1.14 5975665. 30 581526.08 N 70 .34353629 W 149.33831690 6811. 19 91 .75 164. 05 4024 .57 4100 .67 2038. 80 4096 .84 2921. 44 -2429 .28 -1622. 78 1.85 5975635. 42 581534.89 N 70 .34345440 W 149.3382 6842. 56 91 .30 164. 28 4023 .73 4099 .83 2070. 08 4128 .20 2941. 87 -2459. 45 -1614. 23 1.61 5975605. 35 581543.78 N 70 .34337199 W 149.3381 6874. 33 91 .54 164. 62 4022. 95 4099 .05 2101. 78 4159 .96 2962. 88 -2490 .04 -1605. 71 1.31 5975574. 85 581552.63 N 70 .34328840 W 149.33810942 6907. 35 91 .13 164. 78 4022. 18 4098 .28 2134. 74 4192 .97 2985. 02 -2521. 88 -1597. 00 1.33 5975543. 11 581561.69 N 70 .34320142 W 149.33803868 6937. 91 90 .65 165. 96 4021. 70 4097 .80 2165. 26 4223 .53 3005. 95 -2551. 45 -1589. 28 4.17 5975513. 64 581569.73 N 70 .34312066 W 149.33797600 6968. 84 90 .41 165. 46 4021. 42 4097 .52 2196. 17 4254 .46 3027. 43 -2581. 42 -1581. 65 1.79 5975483. 76 581577.70 N 70 .34303878 W 149.33791399 7000. 40 89 .83 164. 79 4021. 35 4097 .45 2227. 69 4286 .02 3049. 29 -2611. 92 -1573. 55 2.81 5975453. 35 581586.14 N 70 .34295546 W 149.33784820 7030. 79 89 .86 165. 33 4021. 43 4097 .53 2258. 04 4316 .41 3070. 48 -2641. 29 -1565. 71 1.78 5975424. 08 581594.30 N 70 .34287525 W 149.33778457 7062. 45 89 .79 165. 32 4021. 53 4097 .63 2289. 66 4348 .07 3092. 82 -2671. 91 -1557. 69 0.22 5975393. 54 581602.66 N 70 .34279158 W 149.33771943 7093. 68 90 .37 164. 14 4021. 48 4097 .58 2320. 84 4379 .29 3114. 78 -2702. 04 -1549. 47 4.21 5975363. 51 581611.21 N 70 .34270928 W 149.33765263 7124. 08 89 .38 164. 84 4021. 55 4097 .65 2351. 18 4409 .69 3136. 22 -2731. 33 -1541. 34 3.99 5975334. 32 581619.67 N 70 .34262926 W 149.33758662 7155. 42 89 .62 164. 55 4021. 82 4097 .92 2382. 47 4441 .03 3158. 56 -2761. 56 -1533. 07 1.20 5975304. 19 581628.27 N 70 .34254669 W 149.33751944 7185. 81 91 .73 164. 08 4021. 47 4097 .57 2412. 79 4471 .42 3180. 22 -2790. 81 -1524. 85 7.11 5975275. 03 581636.81 N 70 .34246677 W 149.33745273 7216. 86 91 .51 164. 75 4020. 59 4096 .69 2443. 77 4502 .46 3202. 53 -2820. 71 -1516. 51 2.27 5975245. 23 581645.48 N 70 .34238510 W 149.33738501 7243. 52 90 .93 164. 94 4020. 02 4096 .12 2470. 38 4529 .11 3221. 95 -2846. 44 -1509. 55 2.29 5975219. 58 581652.73 N 70 .34231482 W 149.33732843 7275. 29 91 .78 162. 45 4019. 27 4095 .37 2502. 05 4560 .87 3244. 77 -2876. 92 -1500. 63 8.28 5975189. 20 581661.99 N 70 .34223156 W 149.33725603 7313. 24 91 .71 164. 11 4018. 11 4094 .21 2539. 85 4598 .80 3272. 04 -2913. 25 -1489. 72 4.38 5975153. 00 581673.30 N 70 .34213232 W 149.33716741 7345. 15 91 .03 164. 83 4017. 35 4093 .45 2571. 69 4630 .70 3295. 59 -2943. 98 -1481. 18 3.10 5975122. 37 581682.18 N 70 .34204836 W 149.33709806 7375. 66 90 .51 164. 82 4016. 94 4093 .04 2602. 15 4661 .21 3318. 36 -2973. 42 -1473. 19 1.70 5975093. 02 581690.49 N 70 .34196792 W 149.3370 7 7404. 70 91 .33 165. 09 4016. 47 4092 .57 2631. 15 4690 .25 3340. 20 -3001. 47 -1465. 65 2.97 5975065. 06 581698.34 N 70 .34189132 W 149.3369 7436. 90 91 .71 165. 33 4015. 62 4091 .72 2663. 30 4722 .44 3364. 63 -3032. 59 -1457. 44 1.40 5975034. 04 581706.90 N 70 .34180630 W 149.33690527 7472. 01 90 .85 164. 90 4014. 84 4090 .94 2698. 36 4757 .54 3391. 37 -3066. 51 -1448. 42 2.74 5975000. 22 581716.29 N 70 .34171363 W 149.33683206 7502. 91 89 .55 164. 83 4014 .73 4090 .83 2729. 21 4788 .44 3414. 96 -3096. 34 -1440. 35 4.21 5974970. 49 581724.69 N 70 .34163215 W 149.33676654 7534. 72 88 .49 165. 90 4015. 27 4091 .37 2760. 98 4820 .24 3439. 53 -3127. 11 -1432. 32 4.73 5974939. 81 581733.06 N 70 .34154809 W 149.33670129 7566. 14 87 .46 165. 10 4016 .38 4092 .48 2792. 35 4851 .64 3463. 95 -3157. 51 -1424. 45 4.15 5974909. 50 581741.26 N 70 .34146504 W 149.33663745 7597. 85 86 .26 166. 56 4018 .12 4094 .22 2823. 99 4883 .30 3488. 80 -3188. 21 -1416. 70 5.95 5974878. 89 581749.35 N 70 .34138119 W 149.33657451 7628. 66 85 .88 166. 40 4020 .23 4096 .33 2854. 71 4914 .04 3513. 24 -3218 .09 -1409. 52 1.34 5974849. 09 581756.87 N 70 .34129954 W 149.33651615 7660. 62 87 .25 168. 76 4022 .15 4098 .25 2886. 61 4945 .94 3539. 07 -3249. 25 -1402. 66 8.53 5974818. 02 581764.07 N 70 .34121444 W 149.33646044 7692. 88 88 .25 168. 94 4023 .41 4099 .51 2918. 84 4978 .18 3565. 69 -3280. 87 -1396. 42 3.15 5974786. 47 581770.66 N 70 .34112804 W 149.33640981 7724. 98 87 .16 168. 80 4024 .70 4100 .80 2950. 91 5010 .25 3592. 26 -3312. 34 -1390. 23 3.42 5974755. 07 581777.20 N 70 .34104207 W 149.33635952 7756. 97 89 .82 169. 23 4025 .54 4101 .64 2982. 89 5042 .23 3618. 89 -3343. 73 -1384. 14 8.42 5974723. 75 581783.64 N 70 .34095632 W 149.33631003 7788. 71 87 .70 166. 97 4026 .23 4102 .33 3014. 61 5073 .96 3645. 12 -3374. 78 -1377. 60 9.76 5974692. 78 581790.52 N 70 .34087151 W 149.33625690 SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205\L-205L5\L-205L5 Generated 8/4/2008 11:08 AM Page 4 of 5 Comments Measured Inclination Azimuth Sub-Sea ND TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS /6LU. .7U OO .V.7 IVa. :7J 4VL/ ..7V YIVY. VV JVYV .JY JIVJ./V JV/V.-JJ -JYVJ .VY -IJ/v. ly J.~1 YVV~. 7852. 54 85 .23 165. 90 4030 .40 4106. 50 3078 .27 5137.65 3696.82 -3436 .62 -1362. 39 2.56 5974631.12 7883. 76 85 .84 166. 21 4032 .83 4108. 93 3109 .38 5168.77 3722.18 -3466 .83 -1354. 89 2.19 5974601.00 7916. 43 89 .21 167. 47 4034 .24 4110. 34 3142 .00 5201.41 3749.12 -3498 .61 -1347. 46 11.01 5974569.31 7948. 03 90 .13 166. 91 4034 .42 4110. 52 3173. 60 5233.01 3775.40 -3529 .42 -1340. 45 3.41 5974538.58 7980. 32 90 .03 167. 50 4034 .37 4110. 47 3205. 89 5265.30 3802.34 -3560 .91 -1333. 30 1.85 5974507.18 8011. 48 89 .83 166. 95 4034 .41 4110. 51 3237. 04 5296.46 3828.42 -3591 .30 -1326. 41 1.88 5974476.87 8043.10 89.55 167. 52 4034 .58 4110. 68 3268. 66 5328.07 3854. 96 -3622 .14 -1319. 42 2.01 5974446. 11 8073.46 88.90 167. 80 4034 .99 4111. 09 3299. 02 5358.43 3880. 64 -3651 .79 -1312. 93 2.33 5974416. 53 8104.94 88.08 167. 89 4035 .82 4111. 92 3330. 49 5389.90 3907. 38 -3682 .56 -1306. 31 2.62 5974385. 85 8137.34 88.69 168. 41 4036 .74 4112. 84 3362. 87 5422.29 3935. 07 -3714 .25 -1299. 66 2.47 5974354. 23 8168.67 89.14 168. 47 4037 .33 4113. 43 3394 .20 5453.61 3962. 00 -3744 .94 -1293. 38 1.45 5974323. 62 8200.36 89.45 168. 12 4037 .72 4113. 82 3425. 88 5485.30 3989. 26 -3775 .97 -1286. 95 1.48 5974292. 66 8232.62 90.82 168. 62 4037 .64 4113. 74 3458. 14 5517.56 4017. 10 -3807 .57 -1280. 45 4.52 5974261. 14 8264.10 90.51 168. 03 4037 .28 4113. 38 3489. 62 5549.04 4044. 32 -3838 .39 -1274. 08 2.12 5974230. 39 8294.70 90.85 168. 81 4036 .92 4113. 02 3520. 22 5579.63 4070. 86 -3868 .37 -1267. 94 2.78 5974200. 49 8326.63 90.24 169. 15 4036 .61 4112. 71 3552 .14 5611.56 4098. 77 -3899 .71 -1261. 83 2.19 5974169. 22 8358.22 89.55 168. 57 4036 .67 4112. 77 3583 .72 5643.15 4126. 41 -3930 .70 -1255. 73 2.85 5974138. 30 8390.01 90.79 169. 74 4036 .58 4112. 68 3615. 51 5674.94 4154. 36 -3961 .92 -1249. 75 5.36 5974107. 15 8422.55 90.65 169. 02 4036 .17 4112. 27 3648. 03 5707.48 4183. 08 -3993 .90 -1243. 75 2.25 5974075. 24 8454.03 91.20 169. 48 4035 .66 4111. 76 3679 .50 5738.96 4210. 89 -4024 .83 -1237. 88 2.28 5974044. 39 8486.17 90.27 169. 10 4035 .25 4111. 35 3711 .63 5771.09 4239. 34 -4056 .40 -1231. 91 3.13 5974012. 88 8517.31 89.11 167. 50 4035 .41 4111. 51 3742 .77 5802.23 4266. 71 -4086 .89 -1225. 60 6.35 5973982. 47 8548.89 88.76 167. 57 4036 .00 4112. 10 3774 .34 5833.80 4294. 31 -4117 .72 -1218. 78 1.13 5973951. 72 Last Survey 8572.09 87.87 167. 44 4036 .68 4112. 78 3797 .53 5856.99 4314. 61 -4140 .36 -1213. 76 3.88 5973929. 14 TD (Projected) 8630.00 87.87 167. 44 4038 .84 4114. 94 3855 .40 5914.86 4365. 36 -4196 .85 -1201. 18 0.00 5973872. 80 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots - Gyrodata gyro orientati on surveys. Not to be run above 70 degrees i nclination. ) INC+TREND - (Inclinometer + known azi tren d --Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model.) MWD + IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Ass umes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Descriation: Northin s~ (Y) fftUSl Eastintt (X) [ftUSI Surface : 2361 FSL 3786 FEL S34 T12N R11E UM 5978082.32 583130.47 BHL : 3444 FSL 4996 FEL S3 T11N R11E UM 5973872.80 581976. 03 581806.42 N 70.34070256 W 149.33613338 581814.25 N 70.34062004 W 149.33607248 581822.03 N 70.34053323 W 149.33601215 581829.38 N 70.34044906 W 149.33595526 581836.88 N 70.34036304 W 149.33589719 581844.10 N 70.34028002 W 149.33584124 581851.43 581858.25 581865.21 581872.21 581878.83 581885.60 581892.46 581899.17 581905.64 581912.09 581918.54 581924.86 581931.21 581937.43 581943.75 581950.40 581957.55 581962.82 581976.03 N 70.34019578 W 149.33578450 N 70.34011477 W 149.33573182 N 70.34003073 W 149.33567802 N 70.33994414 W 149.33562401 N 70.33986030 W 149.3355 N 70.33977554 W 149.335520 3 N 70.33968922 W 149.33546802 N 70.33960501 W 149.33541630 N 70.33952312 W 149.33536642 N 70.33943751 W 149.33531686 N 70.33935284 W 149.33526730 N 70.33926755 W 149.33521872 N 70.33918018 W 149.33517003 N 70.33909571 W 149.33512235 N 70.33900944 W 149.33507385 N 70.33892615 W 149.33502258 N 70.33884193 W 149.33496725 N 70.33878008 W 149.33492651 N 70.33862577 W 149.33482433 CJ SurveyEditor Ver SP 2.1 Bld( doc40x_100) L-205\L-205\L-205L5\L-205L5 Generated 8/4/2008 11:08 AM Page 5 of 5 TREE _ ~ 4-1116" FMC WELLHEAD =FMC GEN 5 ACTUATOR = LEO KB. ELEV = 7s.1o' DRLG DR BF. ELEV = 74.38' KOP = 300' " Max Angle = 20 CONDUCTOR, Datum MD = ° ~ ' 129#, X-56, Datum ND = 4400'. SS ~ = 19.124" 10-3/4" CSG, 45.5#, L-80 BTC, ~ = 9.95" - 7 5/8" CSG, 29.7#, L-80 TCII XO TO BTGM L-205 AFT (L1, L2, L3, L4, L5) PRESSURE GAUGE, ID = 3.864 ~1 4441 AJTA KE PRESS GAUGE, ID = 3.864" 4480' Minimum ID = 3.813" ~ 2400' JEWELRY TYPE "X "Nipple 7-518" X 5-1 /2" BKR ZXP LTP/TIEBK, ~ = 5.75" 4604' 4-1/2" TBG, 12.6#, 13CR-80 VAMTOP, I-~ 4609' .0152 bpf, ~ = 3.958" BAKER HOOK HANGER ASSY 4636' w / L3 SEAL9dG LEM, ID = 3.688" 2400' ~-(4-1/2" HES X N~, D = 3.813" ST MD ND DEV TYPE VLV LATCH PORT DATE 4 2761 2518 33 KBG-2 DMY SBK-2C 0 07/06/08 ~ 3 3915 3504 30 KBG-2 DMY SBK-2C 0 07/06/08 BEK 0 07/06/08 2 4126 3686 33 KBG-2 DCK 1 4339 3859 38 KBG-2 DMY SBK-2C 0 07/06/08 445g' 4-112" Baker CMD SLD SLEEVE, ID = 3.813" 4$e~2' 7-5/8" X 4-1/2" BKR PRM PKR, ~ = 3.875" 45~$' 4-1/2" HES X N~, w /RHGM Plug ~ = 3.813" 4589' 4-1/2" HES X N~, D= 3.813" 4612' 4-1/2" WLEG, ID = 3.958" 4624' 5-112" X 4-1/2" XO, ID= 3.958" L5 (Nb) LEM WN~OW 47° L 5 N b ® - - - r ® - - - 1 asao' - 4651' ( ) 4-1/2" RA TAG @ _6522_ I _~~ _ _ _ ~-®- _ _ _ OPENNG WIDTH = 3.64" 4781' 7-5/8" X 5-1 /2" BKR ZXP LTP/TIEBK, ID = 4.950" 7-5/8" RA TAG 4726' I 4800' 19-1/2' SEAL BORE IXTENSION, ID = 4.75" 4819' 5-1 /2" X 4-1 /2" XO. ID = 3.958" LEM#3 LOWER SEAL ASSY, ID = 3.890" 4813' ~ ea _ L4 (OA) LEM W94DOW 56° BAKER HOOK HANGER ASSY 4837 L4 (OA) _ _ 4-1/2" RA TAG C~ 8897_ ~ 4841' - 4852' w / L2 SEALNG LEM, ~ = 3.688" OPENNG WmTH = 3.64" 7-5/8" RA T AG 4942' 494$' 7-5/8" X 5-112" BKR ZXP LTP/TIEBK, ID = 5.75" LEM#2 LOWER SEAL ASSY, ~ = 3.890" 4973' 4963' 19-1/2' SEAL BORE EXTENSION, ID = 4.75" 4982' 5-1/2" X 4-1/2" XO. ~ = 3.958" BAKER HOOK HANGER ASSY w/ L3 SEALgJG LEM ID= 3 688" 4998' L3 (OBa) - - -~~ - - L3(OBa) LEM WINDOW 62° 1/2" RA TAG 7356 4 5014' I 5003' , . _ . - ~ _ - - - - - ' - 7-5/8" RA T AG 5083' ~® OPENNG VIIDTH = 3.64" 5101' 750" 7-5/8" X 5-1/2" BKR ZXP LTP/TE$K ID = 5 LEM #1 LOWER SEAL ASSY, ID = 3.88" 5147' , . 5132' 19' SEAL BORE EXTENSION, ~ = 4.75" 5151' 5-1/2" X 4-1/2" XO. ID= 3.958" 7 5/8" CSG, 29.7#, L-80 BTGM, ~ = 6.875" 5582' I I I I I L-205 (OBb) - I I PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: N/A Note: Refer to Productan DB for histork;al pert data SIZE SPF ~ITERVAL Opn/Sqz DATE S~ PAGE 2 FOR PERFORATION ~IFORMATION I 5813' 6" WFD FLOW THRU ALUM~JUM BLLET LNR * (BEHIND SLOTTED LINER) ~ ~ L1(OBc) - - - - - -----~ i 5751' 6" WFD FLOW THRU ALUMIN<AN BILLET LNR (BEHIND SLOTTED LINER) L2 a-v2" SOLID LNR, t2s#, L-8o, 895T (0~) .0152 bpf, ~ = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 07/08108 N9ES ORKa1NAl COMPLETION WELL: L-205 PERMR No: 2080530 (540) (580) (550) (560) (570) API No: 50-029-23388-00 (60) (64) (61) (62) (63) SEC 34, T12N, R11 E, 2361' FSL & 1493' FLW BP Exploration (Alaska) L-205 (L1, L2, L3, L4, L5) PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: WA Note: Refer to Production DB for histor~al peff data SQE SPF ZONE INTERVAL Opn/Sqz DATE SLTD Nb 8574-7060 6522-5480 Open 07/07/08 SLTD OA 8708-7444 6897-5320 Open 07/07/08 SLTD OBa 8797-7918 7356-5477 Open 07/07/08 SLTD OBb 8909-6382 Open 07/07/08 SLTD OBC 8948-6412 Open 07/07/08 SLTD OBd 8885-8020 7500-5912 5827-5594 Open 7/7/2008 4-1/2" RA TAG $$46' I 4-1/2" SWELL PACKER, ID = 3.900" 5864' -~ PBTD 8618' 4-1/2" SWELL PKR @4704' ,5449 ',6540 ' B< 7035', D = 3.9" 6a rsa_ _ _ _ 'T ®---- 4-112" SWELL PKR (u3 4925' ,5279 ',6915' & 7419', ID = 3.9" 4-1 /2" SWELL PKR (c~ 5045' , 5419 ', 7373 ' & 7892', D = 3.9" ~ 4-1/2" SWELL PKR ~ 5842', D = 3.9" I I ------ OBb PBTD OBc PBTD 4-1/2" SWELL PKR (~ 6115', D = 3.9" .' ® ----- -~ DATE REV BY COMMENTS DATE REV BY COMMENTS 07/08/08 N9ES ORIGINAL COMPLETION ORION UNR WELL: L-205 PERMIT No: 2080530 (540) (580) (550) (560) (570) API No: 50-029-23388-00 (60) (64) (61) (62) (63) SEC 34, T12N, R11 E, 2361' FSL 8 1493' FLW BP Exploration (Alaska) SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ..................... Orion Well ...................... L-205L5 API number ...............: 50-029-23388-63 Engineer .................. M. Minnick COUNTY :..................: Nabors 9ES STATE :...................: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: ------------------ Mean Sea Level Driller's Pipe Tally 47.60 ft N/A Top Drive 76.10 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 168.00 degrees G ~6 t p [(c)2008 IDEAL ID13_OC_08] "'Z 3-Jul-2008 11:29:52 Page 1 of 7 Spud date ................: 27-Apr-08 Last survey date.........: 02-Jul-08 Total accepted surveys...: 179. MD of first survey.......: 0.00 ft MD of last survey........: 8630.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2007 Magnetic date ............: 29-Jun-2008 Magnetic field strength..: 57652.54 LAMA Magnetic dec (+E/W-).....: 22.88 degrees Magnetic dip .............: 80.89 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............: Tolerance of G............ Tolerance of H............ Tolerance of Dip.........: Criteria --------- 1002.68 meal 57652.50 GAMA 80.89 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-)...... 22.88 degrees Grid convergence (+E/W-).. 0.00 degrees Total az corr (+E/W-)....: 22.88 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey. Report 3-Jul-2008 11:29:52 Page 2 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 100.00 0.57 217.96 100.00 100.00 0.32 -0.39 -0.31 0.50 217.96 0.57 BP _GYD_ SS 3 181.00 0.86 102.64 81.00 180.99 0.83 -0.84 0.04 0.84 177.33 1.50 BP _GYD_ SS 4 275.00 1.76 66.92 94.00 274.97 0.85 -0.43 2.06 2.10 101.85 1.25 BP _GYD_ SS 5 366.00 0.89 343.53 91.00 365.95 -0.12 0.79 3.14 3.24 75.81 2.06 BP _GYD_ SS 6 459.00 1.97 257.97 93.00 458.93 -0.84 1.15 1.37 1.79 49.95 2.26 BP _GYD_ SS 7 551.00 3.36 217.40 92.00 550.83 0.91 -1.32 -1.81 2.24 233.97 2.46 BP _GYD_ SS 8 644.00 5.70 201.25 93.00 643.54 6.55 -7.79 -5.14 9.33 213.43 2.84 BP _GYD_ SS 9 736.00 7.65 210.60 92.00 734.92 14.88 -17.32 -9.92 19.96 209.79 2.42 BP _GYD_ SS 10 835.00 8.60 223.39 99.00 832.93 23.93 -28.37 -18.36 33.79 212.90 2.06 BP _GYD_ SS 11 935.00 9.75 241.75 100.00 931.67 30.55 12 1035.00 13.48 249.51 100.00 1029.61 34.64 13 1115.00 16.16 253.08 80.00 1106.94 36.98 14 1136.89 16.70 254.64 21.89 1127.94 37..42 15 1258.24 22.93 265.48 121.35 1242.09 35.36 16 1326.92 24.06 268.62 68.68 1305.07 31.04 17 1421.68 27.17 270.67 94.76 1390.51 22.73 18 1516.50 30.08 271.97 94.82 1473.73 12.25 19 1611.33 32.06 273.04 94.83 1554.96 -0.02 20 1707.20 31.09 272.76 95.87 1636.63 -12.93 21 1801.84 32.49 272.47 94.64 1717.07 -25.51 22 1896.82 32.42 273.61 94.98 1797.22 -38.74 23 1992.43 33.98 273.42 95.61 1877.22 -52.74 24 2087.04 33.75 273.91 94.61 1955.78 -66.97 25 2181.62 33.61 271.96 94.58 2034.49 -80.49 26 2274.74 33.39 272.09 93.12 2112.14 -92.94 27 2367.93 33.39 272.47 93.19 2189.95 -105.59 28 2462.46 33.02 270.42 94.53 2269.04 -117.63 29 2557.63 33.63 270.02 95.17 2348.56 -128.70 30 2651.46 33.98 270.29 93.83 2426.53 -139.69 -37.81 -30.95 -45.91 -49.34 -52.41 -68.73 -54.13 -74.67 -60.62 -115...11 -62.01 -142.44 -62.22 -183.40 -61.15 -228.80 -59.00 -277.69 -56.46 -327.83 -54.19 -377.63 -51.49 -428.53 -48.28 -480.78 -44.91 -533.39 -42.22 -585.77 -40.41 -637.13 -38.37 -688.37 -37.06 -740.12 -36.86 -792.40 -36.71 -844.61 48.87 219.30 67.39 227.06 86.43 232.67 92.23 234.06 130.09 242.23 155.35 246.47 193.67 251.26 236.83 255.04 283.89 258.00 332.65 260.23 381.50 261.83 431.61 263.15 483.20 264.27 535.28 265.19 587.29 265.88 638.41 266.37 689.44 266.81 741.05 267.13 793.26 267.34 845.40 267.51 3.13 BP_GYD_SS 4.04 BP_GYD_SS 3.54 BP_GYD_SS 3.19 BP_MWD+IFR+MS 5.94 BP_MWD+IFR+MS 2.45 BP_MWD+IFR+MS 3.41 BP_MWD+IFR+MS 3.14 BP_MWD+IFR+MS 2.17 BP_MWD+IFR+MS 1.02 BP_MWD+IFR+MS 1.49 BP_MWD+IFR+MS 0.65 BP_MWD+IFR+MS 1.64 BP_MWD+IFR+MS 0.38 BP_MWD+IFR+MS 1.15 BP_MWD+IFR+MS 0.25 BP_MWD+IFR+MS 0.22 BP_MWD+IFR+MS 1.25 BP_MWD+IFR+MS 0.68 BP_MWD+IFR+MS 0.41 BP_MWD+IFR+MS • [(c)2008 IDEAL ID13_OC_08) SCHLUMBERGER Survey Report 3 -Jul-2008 11:29:52 Page 3 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ --- 31 -------- 2746.02 ------ 33.40 ------- 270.56 ------ 94.56 -------- 2505.21 -------- -150.98 ------- -36.33 --------- -897.06 ------- 897.79 -------- 267.68 ----- 0.63 - BP ---- ------ _MWD+IFR+MS 32 2842.54 33.47 270.62 96.52 2585.76 -162.57 -35.78 -950.24 950.91 267.84 0.08 BP _MWD+IFR+MS 33 2937.92 33.60 270.76 95.38 2665.26 -174.14 -35.14 -1002.92 1003.54 267.99 0.16 BP _MWD+IFR+MS 34 2967.43 33.62 270.56 29.51 2689.84 -177.72 -34.96 -1019.26 1019.86 268.04 0.38 BP _MWD+IFR+MS 35 3107.78 31.53 273.30 140.35 2808.11 -195.86 -32.46 -1094.76 1095.24 268.30 1.82 BP MWD+IFR+MS _ • 36 3203.61 31.04 273.04 95.83 2890.00 -208.88 -29.71 -1144.45 1144.83 268.51 0.53 BP _MWD+IFR+MS 37 3297.38 30.81 272.91 93.77 2970.44 -221.34 -27.21 -1192.57 1192.88 268.69 0.26 BP _MWD+IFR+MS 38 3392.05 30.68 272.74 94.67 3051.81 -233.72 -24.82 -1240.91 1241.16 268.85 0.17 BP _MWD+IFR+MS 39 3487.43 31.05 272.49 95.38 3133.68 -246.06 -22.59 -1289.79 1289.99 269.00 0.41 BP _MWD+IFR+MS 40 3582.92 30.87 268.82 95.49 3215.57 -256.83 -22.03 -1338.89 1339.07 269.06 1.99 BP _MWD+IFR+MS 41 3678.31 29.99 263.26 95.39 3297.84 -263.61 -25.33 -1387.04 1387.28 268.95 3.09 BP _MWD+IFR+MS 42 3772.61 29.22 254.87 94.30 3379.86 -264.51 -34.11 -1432.69 1433.09 268.64 4.47 BP _MWD+IFR+MS 43 3866.93 28.77 247.68 94.32 3462.39 -259.19 -48.74 -1475.92 1476.73 268.11 3.72 BP _MWD+IFR+MS 44 3962.10 29.80 240.93 95.17 3545.41 -248.14 -68.93 -1517.79 1519.36 267.40 3.63 BP _MWD+IFR+MS 45 4055.92 30.62 236.90 93.82 3626.50 -232.69 -93.31 -1558.19 1560.98 266.57 2.33 BP _MWD+IFR+MS 46 4150.19 33.73 229.21 94.27 3706.32 -211.43 -123.54 -1598.14 1602.91 265.58 5.45 BP _MWD+IFR+MS 47 4243.84 36.39 222.26 93.65 3783.00 -182.66 -161.11 -1636.53 1644.44 264.38 5.12 BP _MWD+IFR+MS 48 4339.08 38.26 217.52 95.24 3858.75 -147.01 -205.42 -1673.50 1686.06 263.00 3.60 BP _MWD+IFR+MS 49 4434.10 40.45 214.68 95.02 3932.22 -106.75 -254.11 -1708.97 1727.76 261.54 2.98 BP _MWD+IFR+MS 50 4527.38 43.34 211.09 93.28 4001.66 -62.60 -306.43 -1742.73 1769.46 260.03 4.02 BP _MWD+IFR+MS 51 4621.75 46.89 207.11 94.37 4068.26 -12.20 -364.85 -1775.16 1812.27 258.39 4.80 BP _MWD+IFR+MS 52 4640.00 47.73 205.92 18.25 4080.63 -1.70 -376.86 -1781.15 1820.58 258.05 6.64 BP _BLIND 53 4652.00 49.73 205.31 12.00 4088.55 5.44 -384.99 -1785.05 1826.09 257.83 17.10 BP _BLIND 54 4674.00 51.06 205.31 22.00 4102.57 18.92 -400.31 -1792.29 1836.46 257.41 6.05 BP _INC+TREND 55 4687.74 52.60 205.10 13.74 4111.06 27.53 -410.09 -1796.89 1843.10 257.14 11.27 BP _INC+TREND 56 4718.72 56.04 204.80 30.98 4129.13 47.64 -432.90 -1807.51 1858.62 256.53 11.13 BP _INC+TREND 57 4750.08 60.16 204.50 31.36 4145.70 68.99 -457.09 -1818.61 1875.17 255.89 13.16 BP _INC+TREND 58 4782.14 64.37 204.20 32.06 4160.61 91.84 -482.94 -1830.30 1892.94 255.22 13.16 BP _INC+TREND 59 4813.15 68.55 203.90 31.01 4173.00 114.82 -508.89 -1841.89 1910.89 254.56 13.51 BP _INC+TREND 60 4845.33 72.98 203.38 32.18 4183.60 139.51 -536.72 -1854.06 1930.19 253.86 13.85 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 3 -Jul-2008 11:29:52 Page 4 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 4877.23 76.54 202.72 31.90 4191.98 164.70 -565.04 - 1866.11 1949.78 253.15 11.34 BP _MWD+IFR+MS 62 4909.06 80.77 202.11 31.83 4198.24 190.44 -593.88 - 1878.01 1969.67 252.45 13.42 BP _MWD+IFR+MS 63 4940.89 85.09 202.45 31.83 4202.16 216.54 -623.11 - 1889.98 1990.05 251.75 13.61 BP _MWD+IFR+MS 64 4973.33 87.94 201.35 32.44 4204.13 243.41 -653.15 - 1902.06 2011.07 251.05 9.41 BP _MWD+IFR+MS 65 5005.11 89.76 199.36 31.78 4204.77 270.25 -682.93 - 1913.11 2031.35 250.35 8.48 BP _MWD+IFR+MS • 66 5035.85 93.32 197.56 30.74 4203.94 296.73 -712.07 -1922.84 2050.45 249.68 12.98 BP _MWD+IFR+MS 67 5068.01 96.66 197.08 32.16 4201.14 324.66 -742.65 - 1932.37 2070.17 248.98 10.49 BP _MWD+IFR+MS 68 5100.12 99.36 194.52 32.11 4196.67 352.78 -773.24 - 1941.03 2089.38 248.28 11.53 BP _MWD+IFR+MS 69 5130.05 102.89 192.78 29.93 4190.89 379.25 -801.78 -1947.96 2106.51 247.63 13.10 BP _MWD+IFR+MS 70 5162.33 105.90 190.46 32.28 4182.87 407.89 -832.39 -1954.26 2124.15 246.93 11.64 BP _MWD+IFR+MS 71 5194.15 106.33 185.79 31.82 4174.03 436.58 -862.65 - 1958.58 2140.14 246.23 14.16 BP _MWD+IFR+MS 72 5226.31 104.71 182.81 32.16 4165.43 46.6.32 -893.54 - 1960.90 2154.89 245.50 10.25 BP _MWD+IFR+MS 73 5258.52 105.41 180.68 32.21 4157.06 496.53 -924.63 - 1961.85 2168.83 244.77 6.75 BP _MWD+IFR+MS 74 5289.59 105.73 177.49 31.07 4148.71 525.90 -954.55 - 1961.37 2181.32 244.05 9.94 BP _MWD+IFR+MS 75 5320.14 106.94 174.36 30.55 4140.12 554.93 -983.79 - 1959.29 2192.41 243.34 10.60 BP _MWD+IFR+MS 76 5352.05 106.62 171.54 31.91 4130.91 585.36 -1014.11 - 1955.54 2202.85 242.59 8.52 BP _MWD+IFR+MS 77 5383.88 105.32 171.61 31.83 4122.15 615.91 -1044.38 - 1951.06 2213.00 241.84 4.09 BP _MWD+IFR+MS 78 5415.23 101.39 171.29 31.35 4114.91 646.35 -1074.53 -1946.53 2223.42 241.10 12.58 BP _MWD+IFR+MS 79 5448.22 99.19 171.62 32.99 4109.02 678.75 -1106.63 -1941.70 2234.92 240.32 6.74 BP _MWD+IFR+MS 80 5480.01 96.35 170.36 31.79 4104.72 710.20 -1137.74 -1936.77 2246.22 239.57 9.76 BP _MWD+IFR+MS • 81 5511.39 92.98 168.38 31.38 4102.17 741.46 -1168.47 -1931.00 2257.01 238.82 12.44 BP _MWD+IFR+MS 82 5544.00 89.35 168.34 32.61 4101.50 774.05 -1200.40 -1924.42 2268.12 238.05 11.13 BP _MWD+IFR+MS 83 5575.40 88.42 167.69 31.40 4102.11 805.45 -1231.11 -1917.90 2279.03 237.30 3.61 BP _MWD+IFR+MS 84 5607.01 88.73 168.36 31.61 4102.90 837.05 -1262.02 - 1911.35 2290.40 236.56 2.33 BP _MWD+IFR+MS 85 5638.91 89.59 165.59 31.90 4103.37 868.94 -1293.09 -1904.16 2301.72 235.82 9.09 BP _MWD+IFR+MS 86 5670.66 89.65 165.48 31.75 4103.58 900.66 -1323.83 -1896.23 2312.62 235.08 0.39 BP _MWD+IFR+MS 87 5702.51 90.96 164.15 31.85 4103.41 932.45 -1354.57 -1887.89 2323.57 234.34 5.86 BP _MWD+IFR+MS 88 5734.13 91.06 163.77 31.62 4102.85 963.99 -1384.95 -1879.15 2334.38 233.61 1.24 BP _MWD+IFR+MS 89 5766.48 90.16 159.99 32.35 4102.51 996.15 -1415.69 -1869.09 2344.72 232.86 12.01 BP _MWD+IFR+MS 90 5797.45 91.03 162.65 30.97 4102.19 1026.90 -1445.03 -1859.18 2354.70 232.14 9.04 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 3-Jul-2008 11:29:52 Page 5 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ 91 5827.16 90.96 164.32 29.71 4101.67 1056.52 -1473.51 -1850.73 2365.68 231.47 5.63 BP _MWD+IFR+MS 92 5860.31 89.83 163.21 33.15 4101.44 1089.57 -1505.33 -1841.46 2378.45 230.74 4.78 BP _MWD+IFR+MS 93 5892.77 90.41 164.45 32.46 4101.37 1121.95 -1536.51 -1832.42 2391.37 230.02 4.22 BP _MWD+IFR+MS 94 5925.05 90.27 165.14 32.28 4101.18 1154.18 -1567.66 -1823.96 2405.07 229.32 2.18 BP _MWD+IFR+MS 95 5956.35 89.89 164.05 31.30 4101.14 1185.42 -1597.83 -1815.64 2418.60 228.65 3.69 BP _MWD+IFR+MS 96 5985.16 89.89 163.18 28.81 4101.19 1214.15 -1625.47 -1807.52 2430.90 228.04 3.02 BP _MWD+IFR+MS 97 6020.79 89.48 163.16 35.63 4101.39 1249.65 -1659.57 -1797.20 2446.25 227.28 1.15 BP _MWD+IFR+MS 98 6052.13 87.40 162.20 31.34 4102.24 1280.84 -1689.48 -1787.88 2459.85 226.62 7.31 BP _MWD+IFR+MS 99 6084.05 88.21 161.97 31.92 4103.46 1312.57 -1719.83 -1778.06 2473.73 225.95 2.64 BP _MWD+IFR+MS 100 6114.52 89.21 165.04 30.47 4104.15 1342.93 -1749.03 -1769.42 2487.96 225.33 10.59 BP _MWD+IFR+MS 101 6146.37 89.35 168.07 31.85 4104.55 1374.76 -1780.01 -1762.01 2504.62 224.71 9.52 BP _MWD+IFR+MS 102 6178.31 88.69 171.06 31.94 4105.10 1406.68 -1811.41 -1756.23 2523.00 224.11 9.59 BP _MWD+IFR+MS 103 6210.60 88.25 171.32 32.29 4105.96 1438.91 -1843.31 -1751.28 2542.59 223.53 1.58 BP _MWD+IFR+MS 104 6242.09 86.69 168.89 31.49 4107.35 1470.35 -1874.29 -1745.88 2561.46 222.97 9.16 BP _MWD+IFR+MS 105 6273.70 87.22 170.11 31.61 4109.03 1501.90 -1905.33 -1740.13 2580.37 222.41 4.20 BP _MWD+IFR+MS 106 6302.29 90.23 169.13 28.59 4109.66 1530.47 -1933.44 -1734.98 2597.76 221.90 11.07 BP _MWD+IFR+MS 107 6336.35 89.96 169.30 34.06 4109.61 1564.52 -1966.90 -1728.60 2618.54 221.31 0.94 BP _MWD+IFR+MS 108 6367.92 89.69 168.86 31.57 4109.70 1596.09 -1997.90 -1722.62 2638.00 220.77 1.64 BP _MWD+IFR+MS 109 6399.98 90.17 169.98 32.06 4109.74 1628.14 -2029.41 -1716.74 2658.14 220.23 3.80 BP _MWD+IFR+MS 110 6431.99 90.03 170.21 32.01 4109.69 1660.12 -2060.95 -1711.23 2678.77 219.70 0.84 BP _MWD+IFR+MS 111 6463.08 91.23 169.57 31.09 4109.35 1691.19 -2091.55 -1705.77 2698.94 219.20 4.37 BP _MWD+IFR+MS 112 6494.97 91.51 170.42 31.89 4108.58 1723.06 -2122.95 -1700.24 2719.87 218.69 2.81 BP _MWD+IFR+MS 113 6526.79 90.24 168.95 31.82 4108.10 1754.86 -2154.25 -1694.54 2740.85 218.19 6.10 BP _MWD+IFR+MS 114 6558.18 91.03 166.92 31.39 4107.75 1786.24 -2184.94 -1687.98 2761.02 217.69 6.94 BP _MWD+IFR+MS 115 6590.17 91.57 165.80 31.99 4107.02 1818.21 -2216.02 -1680.44 2781.12 217.17 3.89 BP _MWD+IFR+MS 116 6621.87 91.47 165.29 31.70 4106.18 1849.87 -2246.70 -1672.53 2800.90 216.67 1.64 BP _MWD+IFR+MS 117 6652.84 91.33 165.78 30.97 4105.43 1880.80 -2276.68 -1664.79 2820.43 216.18 1.65 BP _MWD+IFR+MS 118 6685.49 91.20 164.98 32.65 4104.71 1913.41 -2308.27 -1656.55 2841.18 215.67 2.48 BP _MWD+IFR+MS 119 6717.45 91.61 164.06 31.96 4103.92 1945.30 -2339.06 -1648.03 2861.33 215.17 3.15 BP _MWD+IFR+MS 120 6748.92 92.06 164.68 31.47 4102.91 1976.69 -2369.35 -1639.55 2881.31 214.68 2.43 BP _MWD+IFR+MS • [(0)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 3-Jul-2008 11:29:52 Page 6 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 6780.02 92.23 164.37 31.10 4101.75 2007.71 -2399.30 -1631.26 2901.32 214.21 1.14 BP _MWD+IFR+MS 122 6811.19 91.75 164.05 31.17 4100.67 2038.80 -2429.28 -1622.78 2921.44 213.74 1.85 BP _MWD+IFR+MS 123 6842.56 91.30 164.28 31.37 4099.83 2070.08 -2459.45 -1614.23 2941.87 213.28 1.61 BP _MWD+IFR+MS 124 6874.33 91.54 164.62 31.77 4099.04 2101.78 -2490.04 -1605.71 2962.88 212.82 1.31 BP _MWD+IFR+MS 125 6907.35 91.13 164.78 33.02 4098.28 2134.74 -2521.89 -1597.00 2985.02 212.34 1.33 BP _MWD+IFR+MS • 126 6937.91 90.65 165.96 30.56 4097.80 2165.26 -2551.45 -1589.28 3005.95 211.92 4.17 BP _MWD+IFR+MS 127 6968.84 90.41 165.46 30.93 4097.51 2196.17 -2581.42 -1581.65 3027.43 211.50 1.79 BP _MWD+IFR+MS 128 7000.40 89.83 164.79 31.56 4097.45 2227.69 -2611.92 -1573.55 3049.29 211.07 2.81 BP _MWD+IFR+MS 129 7030.79 89.86 165.33 30.39 4097.53 2258.04 -2641.29 -1565.71 3070.48 210.66 1.78 BP _MWD+IFR+MS 130 7062.45 89.79 165.32 31.66 4097.63 2289.66 -2671.91 -1557.69 3092.82 210.24 0.22 BP _MWD+IFR+MS 131 7093.68 90.37 164.14 31.23 4097.58 2320.84 -2702.04 -1549.47 3114.78 209.83 4.21 BP _MWD+IFR+MS 132 7124.08 89.38 164.84 30.40 4097.65 2351.18 -2731.33 -1541.34 3136.22 209.44 3.99 BP _MWD+IFR+MS 133 7155.42 89.62 164.55 31.34 4097.92 2382.47 -2761.56 -1533.07 3158.56 209.04 1.20 BP _MWD+IFR+MS 134 7185.81 91.73 164.08 30.39 4097.57 2412.79 -2790.81 -1524.85 3180.22 208.65 7.11 BP _MWD+IFR+MS 135 7216.86 91.51 164.75 31.05 4096.69 2443.77 -2820.71 -1516.51 3202.53 208.26 2.27 BP _MWD+IFR+MS 136 7243.52 90.93 164.94 26.66 4096.12 2470.38 -2846.44 -1509.55 3221.94 207.94 2.29 BP _MWD+IFR+MS 137 7275.29 91.78 162.45 31.77 4095.37 2502.05 -2876.92 -1500.63 3244.77 207.55 8.28 BP _MWD+IFR+MS 138 7313.24 91.71 164.11 37.95 4094.21 2539.85 -2913.25 -1489.72 3272.04 207.08 4.38 BP _MWD+IFR+MS 139 7345.15 91.03 164.83 31.91 4093.45 2571.69 -2943.98 -1481.18 3295.59 206.71 3.10 BP _MWD+IFR+MS 140 7375.66 90.51 164.82 30.51 4093.04 2602.15 -2973.42 -1473.19 3318.36 206.36 1.70 BP _MWD+IFR+MS • 141 7404.70 91.33 165.09 29.04 4092.57 2631.15 -3001.47 -1465.65 3340.20 206.03 2.97 BP _MWD+IFR+MS 142 7436.90 91.71 165.33 32.20 4091.72 2663.30 -3032.59 -1457.44 3364.63 205.67 1.40 BP _MWD+IFR+MS 143 7472.01 90.85 164.90 35.11 4090.94 2698.36 -3066.51 -1448.42 3391.37 205.28 2.74 BP _MWD+IFR+MS 144 7502.91 89.55 164.83 30.90 4090.83 2729.21 -3096.34 -1440.35 3414.96 204.95 4.21 BP _MWD+IFR+MS 145 7534.72 88.49 165.90 31.81 4091.37 2760.98 -3127.11 -1432.32 3439.53 204.61 4.73 BP _MWD+IFR+MS 146 7566.14 87.46 165.10 31.42 4092.48 2792.35 -3157.51 -1424.45 3463.95 204.28 4.15 BP _MWD+IFR+MS 147 7597.85 86.26 166.56 31.71 4094.22 2823.99 -3188.21 -1416.70 3488.80 203.96 5.95 BP _MWD+IFR+MS 148 7628.66 85.88 166.40 30.81 4096.33 2854.71 -3218.09 -1409.52 3513.24 203.65 1.34 BP _MWD+IFR+MS 149 7660.62 87.25 168.76 31.96 4098.25 2886.61 -3249.25 -1402.66 3539.07 203.35 8.53 BP _MWD+IFR+MS 150 7692.88 88.25 168.94 32.26 4099.51 2918.84 -3280.87 -1396.42 3565.69 203.06 3.15 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 3-Jul-2008 11:29:52 Page 7 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 7724.98 87.16 168.80 32.10 4100.80 2950.91 -3312.34 -1390.23 3592.26 202.77 3.42 BP _MWD+IFR+MS 152 7756.97 89.82 169.23 31.99 4101.64 2982.88 -3343.73 -1384.14 3618.89 202.49 8.42 BP _MWD+IFR+MS 153 7788.71 87.70 166.97 31.74 4102.33 3014.61 -3374.78 -1377.60 3645.12 202.21 9.76 BP _MWD+IFR+MS 154 7820.50 86.05 165.93 31.79 4104.06 3046.34 -3405.64 -1370.16 3670.93 201.92 6.13 BP _MWD+IFR+MS 155 7852.54 85.23 165.90 32.04 4106.50 3078.27 -3436.62 -1362.39 3696.82 201.62 2.56 BP MWD+IFR+MS _ 156 7883.76 85.84 166.21 31.22 4108.93 3109.38 -3466.83 -1354.88 3722.18 201.35 2.19 BP _MWD+IFR+MS 157 7916.43 89.21 167.47 32.67 4110.34 3142.00 -3498.61 -1347.46 3749.12 201.06 11.01 BP _MWD+IFR+MS 158 7948.03 90.13 166.91 31.60 4110.52 3173.60 -3529.42 -1340.45 3775.40 200.80 3.41 BP _MWD+IFR+MS 159 7980.32 90.03 167.50 32.29 4110.47 3205.89 -3560.91 -1333.30 3802.34 200.53 1.85 BP _MWD+IFR+MS 160 8011.48 89.83 166.95 31.16 4110.51 3237.04 -3591.30 -1326.41 3828.42 200.27 1.88 BP MWD+IFR+MS 161 8043.10 89.55 167.52 31.62 4110.68 3268.66 -3622.14 -1319.42 3854.96 200.02 2.01 BP _MWD+IFR+MS 162 8073.46 88.90 167.80 30.36 4111.09 3299.02 -3651.79 -1312.93 3880.64 199.78 2.33 BP _MWD+IFR+MS 163 8104.94 88.08 167.89 31.48 4111.92 3330.48 -3682.55 -1306.31 3907.38 199.53 2.62 BP _MWD+IFR+MS 164 8137.34 88.69 168.41 32.40 4112.84 3362.87 -3714.25 -1299.66 3935.07 199.29 2.47 BP _MWD+IFR+MS 165 8168.67 89.14 168.47 31.33 4113.43 3394.19 -3744.94 -1293.38 3962.00 199.05 1.45 BP MWD+IFR+MS 166 8200.36 89.45 168.12 31.69 4113.82 3425.88 -3775.97 -1286.95 3989.26 198.82 1.48 BP _MWD+IFR+MS 167 8232.62 90.82 168.62 32.26 4113.74 3458.14 -3807.57 -1280.45 4017.10 198.59 4.52 BP _MWD+IFR+MS 168 8264.10 90.51 168.03 31.48 4113.38 3489.62 -3838.39 -1274.08 4044.32 198.36 2.12 BP _MWD+IFR+MS 169 8294.70 90.85 168.81 30.60 4113.02 3520.21 -3868.37 -1267.94 4070.86 198.15 2.78 BP _MWD+IFR+MS 170 8326.63 90.24 169.15 31.93 4112.71 3552.14 -3899.71 -1261.83 4098.77 197.93 2.19 BP _MWD+IFR+MS • 171 8358.22 89.55 168.57 31.59 4112.77 3583.72 -3930.70 -1255.73 4126.41 197.72 2.85 BP _MWD+IFR+MS 172 8390.01 90.79 169.74 31.79 4112.68 3615.51 -3961.92 -1249.75 4154.36 197.51 5.36 BP _MWD+IFR+MS 173 8422.55 90.65 169.02 32.54 4112.27 3648.03 -3993.90 -1243.75 4183.08 197.30 2.25 BP _MWD+IFR+MS 174 8454.03 91.20 169.48 31.48 4111.76 3679.50 -4024.83 -1237.88 4210.89 197.10 2.28 BP _MWD+IFR+MS 175 8486.17 90.27 169.10 32.14 4111.35 3711.63 -4056.40 -1231.91 4239.34 196.89 3.13 BP MWD+IFR+MS 176 8517.31 89.11 167.50 31.14 4111.52 3742.77 -4086.89 -1225.59 4266.71 196.69 6.35 BP _MWD+IFR+MS 177 8548.89 88.76 167.57 31.58 4112.10 3774.34 -4117.72 -1218.78 4294.31 196.49 1.13 BP _MWD+IFR+MS 178 8572.09 87.87 167.44 23.20 4112.78 3797.53 -4140.36 -1213.76 4314.61 196.34 3.88 BP _MWD+IFR+MS 179 8630.00 87.87 167.44 57.91 4114.94 3855.40 -4196.85 -1201.18 4365.36 195.97 0.00 Project to TD [(c)2008 IDEAL ID13_OC_08] Schlumber er g Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken (AOGCC) Well No L-205L5 Date Dispatched: 7-Jul-08 Installation/Rig Nabors-9ES Dispatched By: Franklin Medina LWD Log DeliveryV2.1, 03-06-06 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Jonnson ReCelVed By: BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-11 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojh@hp.com • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Thursday, June 12, 2008 3:09 PM To: 'Kolstad, Scott R' Subject: FW: PBU GRIN L-205, etc Scott, The names have been changed as requested for the L-205 laterals. Changing the name is not really difficult. API numbers would have been something else. I will make sure copies of our messages are placed in the well files. Call or message with any questions. Tom Maunder, PE AOGCC From: Johnson, Elaine M (DOA) Sent: Thursday, June 12, 2008 3:04 PM To: Maunder, Thomas E (DOA) Cc: McIver, C (DOA) Subject: PBU GRIN L-205, etc Tom, Names have been changed in RBDMS: 50-029-23388-61-00 208-055-0 50-029-23388-62-00 208-056-0 50-029-23388-63-00 208-057-0 50-029-23388-64-00 208-058-0 Elaine Page 1 of 1 PRUDHOE BAY UN ORIN ` ;?05L2 is nc ~.~~ L-205L3 PRUDHOE BAY UN ORIN ~-205L3 is now L-205L4 PRUDHOE BAY UN ORIN L-205L4 is now L-205L5 ~... PRUDHOE BAY UN ORIN L-205L1-01 is now L-205L2 6/13/2008 Y `VV -~-GVJ ~ Y-V Y YYCIYAY. Q..YYp.YY~YYAYYI GVC-°VJ4-y GV(-°VJJ9 G,VCS-V J'V9 L,V~ / %-CL~'~. Y 49 Y. G, ~. Fa~om: Kolstad, Scott R [Scott.Kolstad@bp.com] ~~~~~~~~~ ~~~;, ~~,,~ ~ Sent: Thursda ,June 12, 2008 11:47 AM ~ ~~~ ' T®: Maunder, Thomas E (DOA) - Subject: FW: L-205 L1-01 name change permit 208-058, 208-055, 208-056, 208-057 ~~' a ~~ ~. Attachimeints: L-205 Proposed Completion revsied 6_10_08.ZIP; L-205 Old proposed schematic.ZlP ~,f~. ~ ~L Tom, VVe did discuss }ust changing the name of the L-205L1-01 lateral to L-205 L5. We wanted to stay with the naming convention of naming the laterals in the order in which they are drilled and that is why we proposed the changes below.. I think this will make it a iat less confusing when looking back at post welt data. Please let me know which convention you wish to go with. Thanks for your consideration. Scott From: Kolstad, Scott R Sent: Tuesday, June 10, 2008 4:49 PM To: 'Maunder, Thomas E (DOA)' Subject: L-205 Ll-Ol name change permit 208-058, 208-055, 208-056, 208-057 Tom, Due to some difficulty running past the L-205 aluminum billet liner top we would like to make some changes to the location of the L-205 L1 liner top location and exit point for the Obd lateral that was permitted as L-205 L1-01. This will intern change the well bore names from the permitted names. Well targets will remain as permitted. The L-205 L1 liner top wilt be run to 5,750' as depicted in the attached schematic and will cover up the L-205 billet to reduce the risk of further problems with the L-205 billet. This will change the KOP for the Obd lateral to kicking off from the L-205 well bore and not the L-205 L1. We would like to propose the following changes to the naming ~f the Obd lateral and subsequent laterals. -- --- Permitted Well Name Proposed new well name --~, _ ~~ ~ L-205 L1-01 L-205 L2 L-205 L2 ~°~~~ L-205 L3 ~ L-205 L3 L-205 L4 ~I ,~ L-205 L4 ~ •°~~ ~ L-205 L5 Please contact me to discuss. «L-205 Proposed Completion revsied 6_10_08.ZIP» «L-205 Old proposed schematic.ZlP» I have also attached the old (as permitted) schematic for reference. Thanks, 6/12/2008 i[' VV > Il~-G41J L.A-tlA LAQ.lA1G 6;1AQ1A~C11AAli GY7®-S9J®y Gt9o-19JJ9 GOi SJ °\6J l-y G~J 0 a il~'G G ~A G Scott Kolstad Scott Kolstad BP Exploration (Alaska), Inc. Senior Drilling Engineer Greater Prudhoe Bay Rotary Drilling Scott. Kolstad@bp.com Office: (907)564-5347 Cell: (907)748-2598 Fax: (907)564-4040 6/12/2008 ~~ ~~ r { 20" X 3~4" 215.5 Ib/ft. H53 ERVV Insulated @ 109' '` \' Walliburton X-Nipple (3.813" ID) @ 2200' TVD 1 4-1/2", 12.61b/ft, L-80, BTC-M i - Slb gauge ~ •roiih I-Wlre~a ~urtace ~, ~~~V'~N~~~ ~r~AGE~E~~~~~tl~l TFZEE: FMC 4-'1116" 5fvt W ELLHEAD~ FNIC Gen 5 System 'i'I", 5M csg.head w! 7" mandrel hanger & paclcoff .I'I" x 11". 51VI, tGg spool w! 11" x 4-'I/2" lWUiy hanyer with conirol line pons 1"1" X 4-1/16` Adaptor F'lanye Coupl(ng OD: 5.2" Orig KB elev (N-9ES) _' Drift/IQ : 3.833"/3.958" ° 10-314". 45.5#1L-80 BTC Csg @ 3,017 MD 4.5" Baker stidi 1 sleeve with 3.813" ID @ GLM Desian: 7-5/8" X 5-1/2" Biker PRM Packer @ 4482' #4 -TBD' TVD - 4-112" X 1" KBG-2 - SV Halliburton X-Niplples (3.813" ID) #3 -TBD' TVD - 4-1 /2" X 1" KBG-2 - DV I #2 - 4 jis above sliding sleeve - 4-112" X 1" KBG-2 - DV 4.5" WLEG @ gt550' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV in each Lateral and in mother bore from tbg tail down. m `~ RA laq, 0 614" iVb Lateral 4 590 $,b4 i' L,~~O~~~ -... ,~ ~ ,, \ Swell packer placement TBD .,4, , ~ r ~, `~\~r 6-3/4" OA Lateral °1 ~~~~ ~~' 6 ,function $p_e_ciYicatiohs: .a ~ lid~~' ~ ~ ~ 4,800` _ 8.757' I ~ .s Junction ID through LEM 1 RATag~ ~~ •-~, fc ,~,~,~- _ f Module without diverter. 3.68" RAT g TBD 'y /~, • i~ ~ ra LENI run with internal seaibores ~ ~ ~~~~/~`~ _.,.~-------""'---~ to allow the use of isolation ~'~, ~~~` . '~.`J~ ~~ ~ J--~" ~t sleeve across window. 1°'., ~ Swell packer placement TBD ~' l ' Solid Lin t)Bb L ~eiat --- -._. I Baker Hughes Hookwall Hanger F2~Tag TBD ~ . ". `` Window in 7-518" casing ^~ '~~ ~,` ~~.`~-~~ /''~/ Well Inclination @ Window = ` p,, ; ~- "" ' '~. ~1 6- 4" tJBa Lateral 4,935'-8,8fo7' / ;' -r.--'- - -----"""'"" • ~~ ~ ~-~ /~attl E _ Baker Hughes Hookwall Hanger ~ ~ ad~Z~ j ,~ ~ ~tl~ L__ ~ ~? VVndow in 7-518" casing ~^., "`, RA Tag` ~ " i ~ Satin Ib pus ~ uSf~ ~~-~ °°1 Baker Hugatfon Window = 4 '~ - J` Jff{,},~I '.:. ;! i f ~ /[~ter ~ ~~~ ~ •- r @ ~1 ,_. ~^... I'I''O.II'ii~~ll -1.9e'.Tf / / M' / - V ... ,i5 hes Hookwall Hanger `~ ~ -«• Window In /-5/8" casing ~°~ \ Swel acker placement TBD ~:' , d/< P,lu~'. / `~ _ / M '~ Well Inclination @ Window ''~ / - a ~ e 0 0 ., D ~ ~ ~ i311e:- __,_._....~_____~ _ __~,.___. RA~agTBD ,. Ia~g.. dce3i 7-5/8", 29.7#, L 80, BTC ivi @ 5416'~~~ ~ „~ 4 ~ '~ Casing Dnft ti.75' ~ ' ' ^o ~, ~, .7r` ,~ ' ;'b-614"t)ksaLaierai t5,0i1t3 ,~ Casing ID: 6.875" ~.,~,--1~~^~~ - - ~. __.__ DHTt REV BY t.OMMENT9 ~~'n~~~ 'g'~'~$, ~.. -_ _._ .-,...~.. ...._._..... ~._.._._, ._..._..,...-..,~.. _ _ ._._.. ._~.- @I~J° 115;, - ~I~~~ -i-~, 7A~ ~" t /. ~ 312 712 0 0 8 SRK Level 3 inuni-Lateral, 4-1/2" GL Completion ! / ~ ,.ll e ,,~•1 //// +'e°~ ,%ri t --- WELL: L-205IVIL dPl fd0: 50 029- r-1F~f WO: h0 029- ~"-- -- 50-029- 50 029- 50-029- 50 029- 5 3 y 5 2b" X S4" 275.5 IKJ/h, fi+53 Er'YV' t„svlntmd @ 7Uv Halliburton X-Nipple (3.813" ID) @ 2200' TVD 4-1/2", 12.61b/ft, L-80, BTC-M Caup3ir++~ U~--: ~-. Drifu'iG ' 3.833"/3.958" -fREc: FMC fi-7/'Ifs" uvt Yt'FL!_HEAD: rFR4% Gsn 5 Sys4mnt 3'I", SM c~o.heatt 'r:! %' mardre+, hander 8 packcN 'i 1" x Y1', M, t%g sp~oi wl 77" x 4-t/2' tublrrry nsnger wiCn control line ports 71" :C 4t /t 5" A.cla;;icr Fia, i~ Orig KB elev (N-9ES) _' -~ 1 1 ~`° 10.114". a5.5#~ L-80 B'Tt.; Csg @ 3,r~'i7' r:>fU c ~, I v ~ '' I ~ 1" 4.5" Baker sliding sleeve with 3.813" ID @ l l- =~ ~ GLM Design: ' ' #4 -TBD' TVD - 4-1/2" X 1"KBG-2 - SV ~~ 7-5/8" X 5-1/2" Baker PRM Packer @ 4482" Halliburton X-Nipples (3.813" ID) #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV #2 - 4 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV 4.5" WLEG @ 4,550' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Slb NPDG Pressure '.' Gauge -,~ ~,, ~'' Versapro SFMDBM in each Lateral and in mother bore from tbg tail down. ~ ~ with I-Wire to , ~a surface (° ! i I RATag~ 14,590'4 (g..L~,'- I •~sC:,c"v~.f \~ ~°~ '~. ~~ _. ~ °;-®~.-o~ ~-_ ~___~:._ r~a L-205 L5 (Nb LATEF$AL) Swell packer placement TBD FF~ c~ L-205 (OE3b LATERAL) Junction Specifications: ' Ld i,tis, ~ /,ryl~ L-205 L4 (OA LATERAL) Junction ID through LEM I / RATag~ ----- 'rye ~ F5'- ~~€77 -- Module without diverter 3.68" RA Tag TBD ^~j f---; LEM run with internal sealbores ~ (( "'~, }_ _ i to allow the use of isolation I ~ a'_~_~-i"I ~~ ~_ ~ ~ ~ sleeve across window. + ~ . Swell packer4pila'cement TBD :_ B.ti:er iKUghes Hookwali Hangsr I bY~ndow in 7.5/8'' casing j ~V/all lnclinatlor,@Wlnr9aty='' ~ Baker Nu;,hae riaa~wali kangar N'Jrdaw ,r, 7-5/8x easing tk~ ,i4u~'inaUon @ YJindow = f3~:;ier Hugfies;iaakw3tt ~1~ts~4er V~J;ndcw in 7-518" t;2Sing 4"JsH Irrclfnailan (d~ Wihdow 6G7E Y-:tid. Sw RA Tag TBD /~ ~ - ~ ~ ~_~.,~~/ ~~ ~t~,~ ~ t .~~-,~ i . ."_.J L-205 L3 1~1Y~ L-205 L1(OEc LATER~L) RATag~ (O~r~) i Ltt,C' Irs,?:.,"r'-5372 _ " aw~~. Swell packer placement TBD 4iurr:/ o ~ o~ ~ __~,,,.._,._; RA Tag TBD -513°, 29_i#, L-80, STGM (ct~ 54"i6' Cas'srtq Dr17t' 6.?'S" ":~sir,g ID: Ei.&75" COAM1MFY~173 I 4l16I2008 , SRK a ~aWgi 3 rJruiiS-Lniifn3, 4-9f2'' CiL Comyfa~eft7~ Bi1~E4 ~ ~ RA Tag i ., ~~ RA Tag RAlag ~ 5_u0{k'"8,t~79'_ E c7FdiC)t~ ~~ Fiei~+ f.,:~fr~~1'1~t~11r~f' ~~ itr/ELL: i.[05 iti1L l,Pi ~G: ~~-U26- RFi fJv; 5G-rD,2~- ffir1•Li6• >rii-L2ti- L-205 L2 (OEd LATERAL); ~~ ,~ ~ ~ a~ 6 G u At p ~ E J ~~ ~'~Iz ~~1 ~.- ~ ~ ~_~ "~.~ ( ~~~ ~ z ~ ~. S ` ~ COI~TSERV~ ATIO COrII-~SS p15~T Robert Tlrpack Engineering Team Leader BP Exploration Alaska, Inc. PO Box 196612 Anchorage, AK 99519-6612 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Re: Prudhoe Bay Field, Orion Oil Pool, PBU L-205L4 BP Exploration Alaska, Inc. Permit No: 208-057 Surface Location: 2361' FSL, 3786' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 1838' FNL, 2569' FEL, SEC. 03, T11N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well PBU L-205, Permit No 208- 053, API 50-029-23388-00. Production should continue to be reported as a function. of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). incerel Daniel T. eamount, Jr. Chair "7< DATED this ~ ~ day of April, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. SARAH PAL/N, GOVERNOR STATE OF ALASKA ~ih~~~~/~~~® ~ALASf~IL AND GAS CONSERVATION COMM N ~l PERMIT TO DRILL ~ 20 AAC 25.005 APR 0 3 2008 Alaska Oil & Gas Cons. Col'~rn~sion Anchorage 1 a. Type of work ^ Drill ®Redrill • ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test • ®Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: L-205L4 ' 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 8641. TVD 4107 • 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: ' ' ' 7. Property Designation: ~,f4L ADL 028241 QZ$ Schrader Bluff , 2361 FSL, 3786 FEL, SEC. 34, T12N, R11 E, UM Top of Productive Horizon: 2042' FSL, 264' FEL, SEC. 33, T12N, R11 E, UM 8. Land Use Permit: ~ ~ 13. Approximate Spud Date: April 15, 2008 Total Depth: 1838' FNL, 2569' FEL, SEC. 03, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 4970' 4b. Location of Well (State Base Plane Coordinates): Surface: x-583130 • y- 5978082 • Zone-ASP4 10. KB Elevation Plan (Height above GL): 76,7 feet 15. Distance to Nearest We11 Within Pool: 200' ~~~ y. 16. Deviated Wells: Kickoff Depth: 4615 feet Maximum Hole An le: 109 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 1910 • Surface: 1470 - 18. Casin Pr ` ram: S cificatio ns To -8ettin ' De th -Bo ttom uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 4051' 4590' 4052' 8641' 4107' Uncemented Slotted Liner 19. PRESE NT WELLCONDITIbN S UMRIIARY (ro be completed far. Redrill and Re-entry Operations) Total Depth MD (ft): 8977' Total Depth TVD (ft): 4362' Plugs (measured): None Effective Depth MD (ft): 8977' Effective Depth TVD (ft): 4362' Junk (measured): None asing Length.. ize Cement Volume MD D Conductor /Structural 153' 20" Driven 153' 153' Surface 3017' 10-3/4" 663 sx Dee Crete 441 sx Class'G' 3017' 2742' Intermediate 5416' 7-5/8" 359 sx Class'G' 5416' 4412' Prdcin Liner 3377' 4-1/2" Uncemented Slotted Liner L-205 5600' - 8977' 4421' - 4362' Liner 3068' 4-1/2" Uncemented Slotted Liner L-205L1 5905' - 8973' 4412' -4422' Liner 397 ' 4-1/2" Uncemented Slotted Liner L-205L1-01 5000' - 8979' 4283' -4487' liner 3934' 4-1/2" Uncemented Slotted Liner L-205L2 4933' - 8867' 4252' - 4322' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Scott Kolstad, 564-5347 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number: Si nature ,er~tli' ~ Phone 564-4166 Date ,~' Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill a Number: Z~~ ~ ~~ API Number: 50-~Z~ ~ 23 3~ ~'(p3 Permit A provalp See cover letter for Date: (' ~ a other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me_tha/ne, gas hydrates, or gas contained shales: Samples Req'd: ^~~es LrJ No Mud Log Req'd: ^ Yes [a'No HZS Measures: [~JYes ^ No Directional Survey Req'd: Q~Yes ^ No Other: =~~r~ ~~`i ~~ ~ TC~~ // ~ APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-401 Revd 12/2005 ~~~~l;l~(d( Submi In Duplicate ~ ~g~~ .d$ Well Name: L-205, L-205L1, L-205L1-01, L-205L2, L-205L3, & L-205L4 Drill and Complete Plan Summary Type of Well (producer or injector): Schrader Bluff Nb, OA, OBa, OBb, OBc, and OBd T--~ Target X Y Z Township Range Section FSL FEL TVDss Surface 583130.4 5978082.2 12N 11E 34 2361 3786 L-205 OBb Target 581240 5977030 -4330' 12N 11E 33 1330 411 Start: L-205 OBb Target 582015 5973570 -4285' 11N 11E 3 3141 4960 End: L-205L1 OBc Target 581280 5976780 -4335' 12N 11E 33 1080 374 Start: L-205L1 OBc Target 582020 5973570 -4345' 11N 11E 3 3141 4955 End: L-205L7-01O6d 581320 5976600 -4335' 12N 11E 33 899 336 Tar et Start: L-205L1-01O6d 582015 5973560 -4410' 11N 11E 3 3131 4960 Tar et End: L-205L2 OBa Target 581289 5977479 -4175' 12N 11E 33 1779 356 start: L-205L2 OBa Target 582015 5973670 -4245' 11N . 11E 3 3241 4959 End: L-205L3 OA Target 581318 5977589 -4105' 12N 11E 33 1888 325 Start: L-205L3 OA Target 582015 5973770 -4185' 11N 11E 3 3341 4957 End: L-205L4 Nb Target 581377 5977743 -3975' 12N 11E 33 2042 264 Start: L-205L4 Nb Target 581960 5973870 -4035' 11N ilE 3 3441 2569 End: AFE Number: TBD Ri Nabors 9ES GL: 48.2 RT: 28.5 RTE: 76.7 Estimated Start Date: April 15, 2008 O eratin da s to com lete: 72 Well Information Distance to Nearest Property: 4970 feet to PBU boundary. ' Distance to Nearest Well in Pool: 200 feet to L-121A well bore near toe of well at the top Nb level (4500' SS). Well Type: Schrader N and O-sand Sexa-lateral Producer Current Status: New well Conductor: 20", 129 ppf, X-56, ERW set at 152.5' KB BHT: 75 Degrees F at -3950' SS 83 Degrees F at -4300' SS BHP: 8.5 - 8.7 EMW ppg in the Ugnu and Schrader sands ' L-205 Permit to Drill 3/25/2008 SDE: S. Kolstad PE: T. West GEO: G. Bernaski Formation To s TVDss and Estimated Pore Pressures Est. Formation To s Uncertaint Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation TVDss feet Yes/No Psi (PP9 EMW NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation to s are uired from surface to TD for all new wells G1 -250 +/-50' No 113 8.7 SV6 -890 +/-50' No 401 8.7 SV5 -1545. +/-50' No 695 8.7 SV4 -1675 +/-50' No 754 8.7 Base Permafrost -1675 +/-50' No 754 8.7 SV3 -2020 +/-50' Gas H drates 909 8.7 SV2 -2180 +/-50' Gas H drates 981 8.7 SV1 -2470 +/-50' Gas H drates 1112 8.7 UG4 -2750 +/-50' Thin coal 1238 8.7 UG4A -2780 +/-50' Heavy Oil between-2780 and -2880' SS 1251 8.7 UG3 -3095 +/-50' Thin coals 1393 8.7 Fault #1 L Pad Fault -3365 +/- 150' M.D. UG1 -3535 +/-50' Heavy Oil from - 3625' to -3735' ss 1591 8.7 Fault #2 -3745 +/- 100' M.D. UG_Ma -3745 +/-50' Yes 1685 8.7 UG_Mb1 -3790 +/-50' Yes 1706 8.7 UG_Mb2 -3845 +/-50' Yes 1730 8.7 UG_Mc -3910 +/-50' Yes 1760 8.7 SB_Na -3960 +/-25' Yes 1762 8.6 SB_Nb -3980 +/-25' Yes 1771 8.6 SB_Nc -4005 +/-25' Yes 1782 8.6 SB_Ne -4015 +/-25' Yes 1787 8.6 SB_OA -4115 +/-25' Yes 1815 8.5 SB_OBa -4175 +/-25' Yes 1841 8.5 SB_OBb -4215 +/-25' Yes 1859 8.5 SB_OBc -4265 +/-25' Yes 1881 8.5 SB OBd -4310 +/-25' Yes 1901 8.5 SB OBe not reached +/-25' Yes Well TD Criteria TD for all laterals will be at end of polygon. No extensions beyond the end of the polygons are planned. (ie ??ft TVD, ??ft Rathole, etc.) Comments Formation pressures in the O and N sands and are extrapolated from L-106 and L-116 RFT formation pressures. Ugnu M sands and shallower pressure data is extrapolated from regional Schrader Bluff MDT pressure trends at a .45 psi/ft pressure gradient. L-205 Permit to Drill 3/25/2008 U Mud Program: 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densit Funnel vis YP PH FL Initial 8.5 - 9.1 250-300 50-70 8.5-9.0 NC-8.0 Base Perm 9.0 - 9.5 200-250 30-45 8.5-9.0 8.0 Interval TD 9.6 max 200-250 30-40 8.5-9.0 5.0-7.0 8 ~/~" Corin fluid Mud Pro erties: LVT-200 MOBM (Versa-Core) Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 10.4 -10.5 >2000 99:1 15-19 <20 4-5.5 < 6 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densi YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.3 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.3 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logging Program: 13-1/2" Hole Section: Surface Gyro may be needed O en Hole: MWD / GR Cased hole: None 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station O en hole LWD: GR/Res/Neu/Azimuthal Den /Densi Cali er PWD O en hole wireline: Drill i e conve ed MDT Cased Hole: USIT 6-3/4" Produciton Holes: Surreys will be IIFR corrected real time and multi-station O en hole: MWD / GR /Res /Azimuthal Den /Neu /AIM /PWD Cased Hole: N/A Casing/Tubing Program Lateral Hole Size/ Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Name formation Tbg (psi) (psi) MD / MD /TVD O.D. TVD driven 20" 129# X-56 Weld GL 152.5' /152.5' 13-'/z" 10-3/a" 45.5# L-80 BTC 3,580 2,090 3017' GL 3017' / 2742' 9'/8" 7 5/e" 29.7# L-80 BTC-M 6,890 4,790 5416' GL 5416' / / TC-I I 4411.7' L-205 6-3/a" OBb 4-~h" 12.6# L-80 IBT N/A N/A 3377' 5600' 1 8977' / slotted 4421' 4362' L-205 6-3/a" OBc 4-'/2" 12.6# L-80 IBT N/A N/A 3068' 5905' / 8973' / L1 slotted 4412' 4422' L-205 6-3/a" OBd 4-~/2" 12.6# L-80 IBT N/A N/A 3979' 5000' / 8979' / L1-01 slotted 4283' 4487' L-205 6-3/a" OBa 4-~h" 12.6# L-80 IBT N/A N/A 3934' 4933' / 8867' / L2 slotted 4252' 4322' L-205 6-3/a" OA 4-'/2" 12.6# L-80 IBT N/A N/A 3957' 4800' / 8757' / L3 slotted 4182' 4262' L-205 6-g/a" Nb 4-~/a" 12.6# L-80 IBT N/A N/A 4051' 45~' / 8641' / L4 slotted 4052' 4107' Tubing 4-~/2" 12.6# 13Cr- Vam 8,430 7,500 4560' GL 4560'/ 80 To 4032' L-205 Permit to Drill 3/25/2008 Surface and Anti-Collision Issues Surface Shut-in Wells: L-121 and L-110 will require surface shut-in and well house removal in order to move over well L-205. No other wells should require well house removal and surface shut-in. Close Approach Shut-in Wells: All wells pass the major risk close approach scan. Close Approach Well List: Lateral Close Ctr-Ctr Reference Allowable Mitigation Approach Distance MD Deviation Well Name L-205 L-04 77.7' 563' 67.9' Use Traveling C linder L-205 L-109 62.0' 583.3 50.4' Use Traveling C linder L-205 L-114A 55.4' 921.1' 41.2' Use Traveling C linder L-205 L-116 46.1' 489.5' 38..5' Use Traveling C inder L-205 L-121 16.2' 290' 10.9' Use Traveling C linder L-205 L-50 31.2' 979.4' 16.1' Use Traveling C linder L-205 L-51 67.15' 1120' 46.3' Use Traveling C linder Cement Calculations Casin Size: 10-3/a -in 45.5-Ib/ft L-80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 30% excess over gauge hole below permafrost Lead TOC: Surface Tail: 1,000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2,017' MD 1,000' MD above shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer wei hted to 10.10 ppg (Mud Push) Lead 439 bbls, 2465 cult, 663 sks 10.7 Ib/ al Dee Crete - 3.72 cuft/sk Tail 92 bbls, 516 cuft, 441 sks 15.8 Ib/gal Class G + adds -1.17 cufUsk Dura stone in last 15 bbls Temp BHST ~55° F, BHCT ~60° F estimated by Schlumberger In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7-5/8", 29.7-Ib/ft L-80 BTC-M / TC casin Basis: Lead: None Lead TOC: N/A Tail: 1416' of open hole with 30% excess, Tail TOC: 4000' MD 597' MD above the I Total Cement Volume: Wash 20 bbls CW100 S acer 50 bbls of Visco Tail 74.1 bbls, 416 c us 80' shoe track 1000' MD below Surface Shoe 'd Spacer (Mudpush) Weighted to 10.3 359 sks 15.8 Ib/gal G + Gasblok -1.16 = at -4300' SS from SOR 4 L-205 Permit to Drill 3/25/2008 Centralizer Recommendations 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7-s/e" Casing Space Out a) Spaceout the 7 b/B' casing to place a full joint in the window area of the OBa, OA, and Nb sands. b) Place one RA tag (3 pips) in the 7-5/8" casing 50-100' below each window (3 total: below Nb, OBa, OA lateral windows). 5 L-205 Permit to Drill 3/25/2008 Well Control L J Surface hole will be drilled with diverter. The intermediate hole well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOP equipment will be tested to 3000 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: . • Integrity Test - 6-3/4" hole: • Kick Tolerance: • Planned completion fluid: 1,910 psi -Schrader OBd (8.5 ppg ~ 4,310' TVDss) 1,470 psi -Based on a full column of gas C~ 0.10 psi/ft 3,000 psi/250 psi Rams 2,500 psi/250 psi Annular 3,000 psi LOT 100 bbls with a 12.5 ppg EMW LOT , 8.6 ppg OBd 1,910 psi -Schrader OBd (8.5 ppg C~ 4,310' TVDss) 1,470 psi -Based on a full column of gas C~ 0.10 psi/ft , si/250 psi Rams ~'yvt `-i f 2~~500 psi/250 psi Annular ~~ ~~~L 3,000 psi FIT to 11.5ppg EMW for OBb lateral only Infinite at OBb, OBc, OBd, OBa, OA, and Nb with an 11.5 ppg EMW FIT 9.3 ppg SF OBM in Laterals, 9.3 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Varience Request: • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. While the flow paddle is removed from the flow line, PVT alarms will be used and the pit levels accurately monitored for any pit gain. Also, a visual check will be made during connections by looking down the riser to ensure the well is not flawing. After returned debris that could plug the flow line diminishes the flow paddle will be reinstalled. 6 L-205 Permit to Drill 3/25/2008 l_.I Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in the target fault block is expected to be normal pressured at 8.5-8.6 ppg EMW. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L-pad from the SV5 thru the SV1 sands below the base of the permafrost. Setting casing through the SVi should keep hydrate exposure from extending past the surface hole. Recommended practices for drilling hydrates should be followed in the surface hole. Occasionally hydrates are encountered below the SV1. III. Lost Circulation/Breathing A. Lost circulation or well bore breathing are not expected in this well. IV. Kick Tolerance/Integrity Testing Kick Tokarana~ /.In Testin Summa Talk Casing set / Interval Maximum Influx Volume Mud Weight Exp Pore Press LOT / f1T Surface / 9 7/8" 100 9.3 8.5 (OBd) Assuming 12.5 LOT Intermediate / 6-3/4" Infinite 9.3 8.5 (OBc) - 11.5 (FIT for OBb lateral onl An FIT will onl be erformed for the OBb lateral, not the OBc, OBd, OBa, OA, or Nb. V. Hydrogen Sulfide L Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should ~ be followed at all times. No measurable H2S is being produced from the formation at this time. However 5 - 50 ppm is expected as a result of the use of Ivishak gas lift gas. All L Pad gas lift wells will likely have H2S in this concentration. Note that all injection has been with produced water not seawater. H2S levels are expected to remain low until the waterflood matures. Recent H.,S data from the oad is as fnllows~ ell Name H2S Level Date of Readin #1 Closest SHL Well H2S djacent well to the Level L-110 70 m 10/11/2007 east of L-205 SHL #2 Closest SHL Well H2S djacent well to the Level L-121A 15 m 8/28/2007 est of L-205 SHL #1 Closest BHL Well H2S. Kuparuk producer Level L-114A 0 m 8/14/2007 near heel of laterals #2 Closest BHL Well H2S Kuparuk producer Level L-121A 15 m 8/28/2007 near toe of laterals Max. Recorded H2S on Pad/Facili L-120 50 m 10/20/2006 VI. Faults A. Two faults are expected to be crossed in L-205. No losses are expected to be associated with these faults. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may be encountered. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - L Pad Fault 3824 -3365 -50'-80' West +/- 150' M.D. Fault #2 - Ugnu M Sand Interval 4277 -3745 -40'-70' West +/-100' M.D. CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 7 L-205 Permit to Drill 3/25/2008 L-205, L-205 L1, L-205 L1-01, L-205 L2, L-205 L3, & L-205. L.4 DRILL AND COMPLETE PROCEDURE SUMMARY 1. A "non-insulated conductor has already been set and surveyed. Weld an FMC landing ring for the FMC Gen 5 W Ihead on the conductor. 2. If nece sary, level the pad and prepare location for rig move. Prepare neighboring wells for the rig move and producti simops. 1. MIRU Nabors 9 .Nipple up diverter spool and riser. Function test diverter. PU 4" DP and stand back in derrick. 2. MU 13-'h" drilling as embly with MWD/GR and directionally drill surface hole to approximately 80' TVDss above the Top of the G4A (13017' MD). 3. Run and cement the 10 a", 45.5#, L-80 BTC surface casing back to surface. Test the 10-3/a" casing to 3,000 psi for 30 minutes at plug ump. ND drilling spool and riser and NU casing /tubing head. NU BOPE and test to 3,000 psi. • L-205 P61 4. MU 9 %8" directional drilling ass bly with a bent housing motor. Drill out the float equipment and 20' of new formation. Displace the well ton 9.3 ppg Versa Pro LS MOBM drilling fluid. Perform a LOT. POOH. 5. MU 8'/z" directional drilling assemb with Schlumberger Power Drive RSS, Gamma at bit, MWD/ARC GR/Res/Den/Neu/PW D and a Ghost amer ±1,000' from the bit. 6. Directionally drill ahead to 50' above pr 'ected core point. Displace the well bore to the Versa Core coring fluid. Drill to core point which is prognosed at - 40' TVDss. 7. Core 480' starting in the mid Mc through th base Schrader Bluff OBd. 8. Drill t 200' of logging rat hole. 9. Log the open hole interval using wireline-conve d Schlumberger Platform Express GR/Res/Neu/Den and Dipole Sonic 10. MU plug back BHA. RIH and spot a series of ceme t plugs to fill the OH from TD to inside the surface casing shoe. 11. POOH. • L-205 OBb Lateral 12. PU 4" DP as needed. MU 9 7/8" directional drilling assembly ith MWD/GR/Res/Den/Neu/PWD and a Ghost reamer 11,000' from the bit. 13. Drill out cement to the surface casing shoe. 14. Displace the well bore to 8.8 ppg LSND mud. 15. Drill to TD at 20' TVD below the top of the OBd. 16. RU and run drill pipe conveyed MDT logs. 17. Make a clean out run to TD. 18. MU and run 7 5/g", 29.7#, L-80, BTC-M, TC-II casing to TD. Cement in one age to -4,000' MD (11000' MD from the surface casing shoe). Bump plug with seawater. Test the 7 5/e" Iasi to 3,000 psi for 30 minutes. 19. Clean pits for displacement. Freeze protect 7 5/8" x 10-3/a" annulus to 2,200' TV 20. PU 6-3/a" conventional assembly with MWD/GR/Res/Den /Neu/AIM/PWD and RIH the float collar. 21. Displace well over to 9.3 ppg Versapro LS MOBM. Drill out shoe track, circulate an condition mud. Drill 20' of new formation and perform FIT to 11.5 ppg EMW. 22. Directionally drill ahead to TD geo-steering through the OBb to TD. Back ream out of th hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 4;. 23. POOH to near OBa window depth, log the OBa RA marker with GR, log across the OA and~Nb windows also. POOH. 24. MU and run 4-~/z" 12.6# L-80 BTC-M slotted liner with swell packers and Aluminum billet liner billet in a tangent section at ±5,600'. POOH. 8 L-205 Permit to Drill 3/25/2008 • L-205L1 OBc Lateral 25. RI with 6-3/a" sidetracking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PW D to AI billet. Displace well ov to 9.3 ppg Versapro LS MOBM. Trench for sidetrack and time drill off billet to sidetrack. 26. Direc Wally drill to the planned TD in the OBc. Back ream out of hole to shoe, circulate and condition mud. RIH to and displace well bore to 9.3 ppg Versapro SF MOBM. POOH. 27. MU and ru -'/z" 12.6# L-80 BTC-M slotted liner with swell packers and Aluminum billet liner top. Position billet in a tan nt section at ±5,905'. POOH. • L-205L1-010 Lateral 28. RIH with 6-3/a" sidet cking /drilling assembly with MWD/GR/Res/Den/Neu/AIM/PW D to AI billet. Displace well over to 9.3 ppg Versa o LS MOBM. Trench for sidetrack and time drill off billet to sidetrack. 29. Directionally drill ahead t TD geo-steering through the OBd to TD. Back ream out of the hole to the shoe, circulate and condition mu RIH to TD and displace well bore to SF MOBM. 30. MU and run 4-'/z" 12.6# L-80 C-M slotted liner with liner hanger and liner top packer. Position TOL for OBa whipstock. POOH. • L-205L2, OBa Lateral 31. PU the 7 5/8" whipstock assembly. Se he whipstock on the OBd liner top packer such that the top of the window is near the top of the OBa sand. rient and set whipstock. Shear off Whipstock. Displace well over to 9.3 ppg Versapro LS MOBM. Mill window. OOH. 32. RIH with 6-3/a" conventional drilling assembly 'th MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of OBa late .Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. OH. 33. Pull whipstock #1. Run and set 4-~/z" slotted liner an ook hanger. POOH and LD liner running string. Run Baker Lateral Entry Module #1 with ZXP liner top pack POOH. • L-205L3, OA Lateral 34. PU the 7-5/B" whipstock assembly. Set the whipstock on the a liner top packer such that the top of the window is near the top of the OA sand. Orient and set whipsto .Shear off Whipstock. Displace well over to 9.3 ppg Versapro MOBM. Mill window. POOH. 35. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/De eu/AIM/PWD to whipstock. Directionally drill to the planned TD of the OA lateral. Back ream out o ole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 36. Pull whipstock #2. Run and set 4-'h" slotted liner and hook hanger. POOH d LD liner running string. Run Baker Lateral Entry Module #2 with ZXP liner top packer. POOH. • L-205L4, Nb Lateral '-~•~`S ~~~ C 37. PU the 7 5/6" whipstock assembly. Set the wh°ip~stock on the OA liner top packer such that the top of the window is near the top of the Nb sand.' Orient and set whipstock. Shear off of Whipstock. Displace well over to 9.3 ppg Versapro MOBM. Mill window. POOH. 38. RIH with 6-3/a" conventional drilling assembly with MWD/GR/Res/Den/Neu/AIM/PWD to whipstock. Directionally drill to the planned TD of the Nb lateral. Back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 39. Pull whipstock #3. Run 4-'/z" slotted liner and hook hanger. POOH and LD liner running string. Run Baker Hook Hanger Lateral Entry Module #3 with ZXP liner top packer. Clean pits for displacement. Displace mother bore over to 9.3 ppg KCL brine. POOH. 40. MU 4-'/z" 12.6# Vam Top, 13Cr-80 completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 41. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,000 psi and annulus to 3,000 psi. Shear DCK valve. 42. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master valves to 5,000 psi. 43. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7-5/8" casing annulus valves. 44. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work• 1. MIRU slickline. Pull the ball and rod /RHC plug. 2. Pull out DCK shear valve, install GLV in all of the other mandrels as per the PE. 9 L-205 Permit to Drill 3/25/2008 L-205, L1, L1-01, L2, L3, & L4 PROPOSED COMPLETION ~ 20" X 34" 215.5 Ib/ft, A53 ERW Insulated @ 109' ~ Halliburton X-Nipple (3.813" ID) @ 2200' TVD 4-1/2", 12.61b/ft, L-80, BTC-M Coupling OD: 5.2" DrifUID : 3.833"/3.958" 10-3/4", 45.5# L-80 BTC Csg @ 3,017' MD ~i 6-314" OA Lateral RATag~ 4,800' - 8,757 -_-_® -~ ~ -__ _ ~-Zo.t~3 ~1 Swell packer placement TBD Solid Liner OBb Lateral r \ 5,600'- 8,977' ~^~ ~ OJ RA Tag TBD/ 4.5" Baker sliding sleeve with 3.813" ID @ GLM Design: 7-5/8" X 5-1/2" Baker PRM Packer @ 4482' ~ -TBD' TVD - 4-1/2" X 1" KBG-2 - SV Halliburton X-Nipples (3.813" ID) #3 -TBD' TVD - 4-1/2" X 1" KBG-2 - DV #2 - 4 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV Slb NPDG 4.5" WLEG @ 4,550' MD #1 - 2 jts above sliding sleeve - 4-1/2" X 1"KBG-2 - DV Pressure Gauge v with I-Wire to own. surface \\' RA Tag) 6-3/4" Nb Lateral 4,590'- 8,641' L- ~dSL~ , Swell packer placement TBD Junction Specifications: / Junction ID through LEM Module without diverter: 3.68" RA Tag TBD LEM run with internal sealbores to allow the use of isolation sleeve across window. Baker Hughes Hookwall Hanger Window in 7-5/8" casing Welt Inclination @ Window = ° Baker Hughes Hookwall Hanger Wndow in 7-5/8" casing Well Inclination @ Window= Baker Hughes Hookwall Hanger Window in 7-5/8" casing Well Inclination @ Window TREE: FMC 4-1/16" SM WELLHEAD: FMC Gen 5 System 11", SM csg.head w/ 7" mandrel hanger 8 packoff 11" x 11", 5M, tbg spool w/ 11" x 4-1/2" tubing hanger with control line ports 11" X 4-1/16" Adaptor Flange Orig KB elev (N-9ES) _ ' 8.314" OBa Lateral 4,933'-8,867' .f \ RA Tag, L,2bs~~ Swell packer placement TBD ,,~ R ag . , 29.7#, L-80, BTC-M @ 5416'_ Casing Drift: 6.75" Casing ID: 6.875" DATE REV. BY COMMENTS ORION Field ' r~ ~ ' 3!47/2008 SRK Level 3Multi-Lateral, 4-112" GL Completion J ~,~fPl I7![I (Jf ~~IY WELL: L-205 ML API NO: 50-029- API NO: 50-029- 50-029- 50-029- 50-029- 50-029- OBc Lateral ..// Solid 5,905'- 8,972' L'~Q's~.L Liners ~ .1 Alum. ~ /~ I Billets ° .I RATag~ t ~~L l'V 1 _-_ I~~I --~ IIII - `" 6-3/4" OBd Lateral 5,000'- 8,979 _ I I PLANT - N~15•o0'00.. GRIP ~ - I L-PAD N-L (NWE-1) L-1111 ^ ^ N-A (NWE-2) L-51 ^ ^ L-2181 L-114 ^ ^ L-124 L-50 ^ ^ L-1121 ^ L-02 L-121 ~ L-1231 L-205 ~ ^ L-122 L-110 ^ L-2111 L-2201 ^ ^ L-1151 L-116 ~ ^ L-117 L-109 ^ ^ L-118 L-041 ^ i I ^ L-250 L-01 ^ ^ L-200 L-107 ^ ^ L-202 L-03 ^ ^ L-2121 L-2211 ^ ^ L-2171 L-2131 ^ ^ L-203 L-1081 ^ ^ L-2161 L-1051 ^ ^ L-1031 L-106 ^ ^ L-2151 L-204 ^ ^ L-201 L-104 ^ ^ L-1191 L-2141 ^ ^ L-2101 L-102 ^ ^ L-120 ^ L-21st /~ J,! I I 34 I 35 L-PAD -I I I T12N 1 - - - -~ -- T11N ~ 3 ~ 2 VICINITY MAP N.T.S. A `49 ~ ~ `9~ ovoooo<ooooovoooo>>oooo<ooo<oo `~, Richard F. Allison ~s ` 10608 ,~ "~E3sio-~a-~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF MARCH 27, 2008. GRAPHIC SCALE 0 75 150 300 I I I I (IN FEET ) 1 inch = 150 it. LEGEND NOTES -~- AS-BUILT CONDUCTOR 1. DATE OF SURVEY: MARCH 27, 2008. ^ EXISTING CONDUCTOR 2. REFERENCE FIELD BOOK: W008-02 PAGES 70-71. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. 4. HORIZONTAL AND VERTICAL CONTROL IS BASED ON L PAD OPERATOR MONUMENTATION. 5. ELEVATIONS ARE BPX M.S.L. DATUM 6. MEAN PAD SCALE FACTOR IS 0.999907827. I nrercn wlrulN oanl-Rerrcn c~c ~d T 12 N R 11 F I IAAIAT AAFRInIAN_ AI ASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION N0. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS -- Y= 5,978,082.32 N. 9820.11 70'21'00.329" 70.3500914' 6 47 2,361' FSL ' L-205 X= 583,130.47 E. 5090.16 149'19'30.284" 149.3250789' ' FEL 3,786 CHECKED:~CS bP DATE3/28/08 DRAWING: WOA L-PAD yy~~((~~((~~ FRB08 WOL 02-00 SHEET: ~ ILJL~]iUOO ~o ~°e No. CONDUCTOR AS-BUILT ,,,,g „g,R,v„ scALE: 1 of 1 0 3 28 OB IssuW faR INFORMATION '~ ~•+` ~ ~,i ,~~ urn 1'= 150' WELL L-205 Nb L-205k8 (P7) Pro ~ Schlumberger Report Date: December 17, 2007 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 170.000° Field: Structure 1 Slot: Prudhoe Bay Unit - WOA L-PAD / S-G ~~ Vertical Section Origin: ay TVD Reference Datum: N 0.000 ft, E 0.000 ft Rotary Table Well: Plan L-205 (S-G) ~'~~ TVD Reference Elevation: 76.70 ft relative to MSL Borehole: ~~~ Plan L-205L5 Nc ~B~ Sea Bed I Ground Level Elevation: 48.20 ft relative to MSL UWI/API#: 50029 Magnetic Declination: 22.893° Survey Name 1 Date: L-205L5 (P7) /December 17, 2007 Total Field Strength: 57651.622 nT Tort 1 AHD / DDI 1 ERD ratio: 190.798° / 5930.57 ft / 6.369 / 1.419 Magnetic Dip: 80.885° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: June 17, 2008 Location LaflLong: N 70.35009112, W 149.32507940 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5978082.200 ftUS, E 583130.400 ftUS North Reference: True North Grid Convergence Angle: X0.63561986° Total Con• Mag North -> True North: +22.893° Grid Scale Factor: 0.99990785 Local Coordinates Referenced To: Well Head P L_I Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW Mag 1 Grav DLS Directional Northing Easting LatRude Longitude Depth Section Tool Face Difriculty ft de de ft ft ft ft (ft (de de 1100 ft Index ftUS ftUS IOp WHIPSTOCK 4025`J. 7L 4/.`JJ LUO.iS`J J`J/AUV 4VDl./U y./ / -JIa./J -I /O/.V I nJ w./O V.LO oa/ / /9J. uJ ao IJ/ /.c I rv /v .Jyac I / Va vv 19~.JJ.7J41.71 Base Whipstock 4602. 52 50.01 205.89 3983 .54 4060 .24 17.71 -328.55 -1761.29 --- 16.00 5.29 5977734. 17 581373.03 N 70 .34919299 W 149.33937665 KOP Crv 12/100 ~ 4614. 52 50.01 205.89 3991. 25 4067 .95 25.16 -336.82 -1765.30 HS 0.00 5.29 5977725. 85 581369.11 N 70 .34917039 W 149.33940923 4650. 00 54.27 205.89 4013 .02 4089 .72 47.85 -362.01 -1777.53 HS 12.00 5.32 5977700. 53 581357.16 N 70 .34910156 W 149.33950846 4700. 00 60.27 205.89 4040 .04 4116 .74 81.90 -399.83 -1795.89 HS 12.00 5.36 5977662. 51 581339.22 N 70 .34899823 W 149.33965741 4750. 00 66.27 205.89 4062 .52 4139 .22 118.06 -439.99 -1815.39 HS 12.00 5.39 5977622. 14 581320.18 N 70 .34888852 W 149.33981555 4800. 00 72.27 205.89 4080 .22 4156 .92 155.93 -482.04 -1835.80 HS 12.00 5.43 5977579. 88 581300.24 N 70 .34877363 W 149.33998115 4850. 00 78.27 205.89 4092 .93 4169 .63 195.09 -525.52 -1856.90 HS 12.00 5.47 5977536. 17 581279.62 N 70 .34865482 W 149.34015238 4900. 00 84.27 205.89 4100 .51 4177 .21 235.11 -569.96 -1878.47 HS 12.00 5.50 5977491. 49 581258.54 N 70 .34853340 W 149.34032738 Crv 12/100 4947. 77 90.00 205.89 4102 .90 4179 .60 273.75 -612.87 -1899.30 58.92E 12.00 5.54 5977448. 36 581238.20 N 70 .34841617 W 149.34049634 4950. 00 90.14 205.66 4102 .90 4179 .60 275.55 -614.87 -1900.26 58.92E 12.00 5.54 5977446. 35 581237.25 N 70 .34841069 W 149.340 5000. 00 93.23 200.52 4101 .43 4178 .13 317.40 -660.82 -1919.86 59.07E 12.00 5.57 5977400. 18 581218.17 N 70 .34828514 W 149.34066 3 5050. 00 96.30 195.34 4097 .27 4173 .97 361.40 -708.21 -1935.19 59.50E 12.00 5.60 5977352. 64 581203.36 N 70 .34815568 W 149.34078752 5100. 00 99.31 190.11 4090 .48 4167 .18 407.07 -756.50 -1946.11 60.21 L 12.00 5.64 5977304. 23 581192.99 N 70 .34802373 W 149.34087600 5150. 00 102.25 184.78 4081 .12 4157 .82 453.90 -805.18 -1952.48 61.21 L 12.00 5.67 5977255. 49 581187.16 N 70 .34789075 W 149.34092761 5200. 00 105.08 179.33 4069 .30 4146 .00 501.39 -853.71 -1954.23 62.49E 12.00 5.70 5977206. 95 581185.94 N 70 .34775817 W 149.34094176 5250. 00 107.78 173.75 4055 .14 4131 .84 549.01 -901.55 -1951.36 64.08E 12.00 5.73 5977159. 14 581189.35 N 70 .34762747 W 149.34091832 End Crv 5269 .53 108.80 171.52 4049 .02 4125 .72 567.52 -919.94 -1948.98 -- 12.00 5.74 5977140. 79 581191.93 N 70 .34757725 W 149.34089900 Crv 12/100 5401 .99 108.80 171.52 4006 .34 4083 .04 692.88 -1043.97 -1930.49 164.75E 0.00 5.78 5977016. 98 581211.79 N 70 .34723841 W 149.34074867 5450 .00 103.23 169.97 3993 .10 4069 .80 739.00 -1089.49 -1923.07 165.17E 12.00 5.80 5976971. 55 581219.72 N 70 .34711405 W 149.34068828 5500 .00 97.43 168.42 3984 .14 4060 .84 788.17 -1137.79 -1913.84 165.45E 12.00 5.83 5976923. 36 581229.48 N 70 .34698212 W 149.34061332 5550 .00 91.62 166.92 3980 .20 4056 .90 837.95 -1186.46 -1903.20 165.57E 12.00 5.86 5976874. 82 581240.66 N 70 .34684916 W 149.34052683 WeIlDesign Ver SP 2.1 Bld( doc40x_100) S-G\Plan L-205 (S-G)\Plan L-205L5 Nc\L-205L5 (P7) Generated 12/17/2007 2:55 PM Page 1 of 2 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting LatRude Longitude ~~ Section Tool Face Difficulty ft de de ft (ft ft ft ft de de 1100 ft Index ftUS (ftUS ) L-LU5L5 NC IgiL 55b3.yL yV.VU "Ibb.bU Sy25U .VV 4V5b.7'V t5bl.tl4 -"ILVU.UU -IyUU.VV "Iby.ybL "I L.VU 5.25b 5y/btlb"1.31 End Crv 5565.73 89.79 166.46 3980 .00 4056 .70 853.65 -1201.76 -1899.58 --- 12.00 5.86 5976859 .55 Crv 6/100 6814.09 89.79 166.46 3984 .67 4061 .37 2099.62 -2415.42 -1607.35 136.30R 0.00 6.11 5975649 .32 L-205L5 Nc Tgt 3 6839.12 88.70 167.50 3985 .00 4061 .70 2124.61 -2439.81 -1601.71 138.61 R 6.00 6.12 5975625 .00 6850.00 88.21 167.93 3985 .29 4061 .99 2135.48 -2450.44 -1599.40 138.60R 6.00 6.12 5975614 .40 End Crv 6853.66 88.05 168.08 3985 .41 4062 .11 2139.13 -2454.02 -1598.64 --- 6.00 6.12 5975610 .83 Crv 6/100 7857.81 88.05 168.08 4019 .66 4096 .36 3142.14 -3435.93 -1391.31 37.60E 0.00 6.27 5974631 .37 L-205L5 Nc Tgt 4 7869.47 88.60 167.65 4020 .00 4096 .70 3153.79 -3447.33 -1388.86 37.82E 6.00 6.27 5974620. 00 End Crv 7883.47 89.26 167.14 4020 .26 4096 .96 3167.76 -3460.98 -1385.80 --- 6.00 6.28 5974606 .38 TD / 4-1/2" Lnr ~ 8640.91 89.26 167.14 4030 .00 .4106 .70 3924.19 -4199.35 -1217.17 --- 0.00 6.38 5973870 .00 D25 "IZ44.U1 N /U.34btllLl/ VV 14y.34VOVV254 581244.45 N 70.34680736 W 149.34049740 581550.09 N 70.34349193 W 149.33812343 581556.00 N 70.34342531 W 149.33807762 581558.43 N 70.34339627 W 149.33805882 581559.23 N 70.34338650 W 149.33805265 581777.42 N 70.34070411 W 149.33636863 581780.00 N 70.34067297 W 149.33634872 581783.20 N 70.34063567 W 149.33632392 581960.00 N 70.33861860 W 149.3349 i WeIlDesign Ver SP 2.1 Bld( doc40x_100) S-G\Plan L-205 (S-G)\Plan L-205L~Nc\L-205L5 (P7) Generated 12/17/2007 2:55 PM Page 2 of 2 by Schlumber er 9 ALL L-205L~ (P7) FIELD Prudhoe Bay Unit - WOA 8TRl1CTDRE L-PAD Maprietic Panmefars BeRace location NAD2]Alaska State Pbnes. Zone Oa, US Feat Miscelaneouz MoEel. BGGM 200] Dip. &1.865' Date et]. 2006 Lat. NI0210328 NaRM1ing. 59]808220 M18 GrlE COnv. x063561986' 61ot. S~G NDReI'. Robry Tabk l]6.]O Rabove MSLI Mag Dec'. X22893° F6. 5]65t 6ni W1a91930.286 Easbng. a0 MJ5 Scale Fact. 0.99990]8503 Plan. L~205L5IP]I Brvy Dete December l], 200] •I 0 500 1000 1500 2000 2500 3000 3500 4000 (P3) Whipstock • L-205L5 Nc Tgt 2 Ise Whipstock ;OP Crv 12/70Q Crv 12/100 FII End Ctv •-•,-••-•. L 205L5 Ne Tgt 3 • -••-••- -••-••-••-••-••-• L-205Lli N=Tgt 4 -••-..- -..-•` _.~ R~rtnn c..w ~... -~ 1 Crv 6/100 End Crv End Crv •~ 4000 0 0 c N m ~ 4500 5000 Crv 61100 '~7a^u^a^u^u^n^u^uautn>.a.a.ua~~.u^n^u 5LS(P7) L-205L~(I ~r-2esc r 0 500 1000 1500 2000 2500 3000 3500 4000 Vertical Section (ft) Azim = 170°, Scale = 1(in):500(ft) Origin = 0 N/-S, 0 E/-V 4000 3) >~500 i 5000 by , Schlumberger WELL FIELD STRUCTURE L-205L (P7) Prudhoe Bay Unit - WOA L-PAD MagneSC Parameters 8urtaca Lou[mn N4G2] AWSka State Planes. Zone 04. US Fae[ Miscellaneous Modal-. BGGM 200] Olp: 80885' Gate'. June 17. 2008 La[ N]0210.328 NeMing. 59]BOB2.20 RUS Grq Cenv. X0.63561986° Slot: 5-G NO Ref: Rotary Table ~]fi.]OR above M9L) Mag Gac: X22893° F5. 5]651.6 nT Lon W1091930.28fi Easting. 583130.<O RUG Scala Fac1:099590]8503 Plan. 1-205L5 ~PI~ Srvy Date. December l], 200] -2400 -1800 -1200 -600 0 0 -600 -1200 n n ~ -1800 Z 0 0 cD c I I -2400 v v v -3000 -3600 -4200 0 -600 -1200 -1800 -2400 -3000 -3600 -4200 -2400 -1800 -1200 -600 0 ~« W Scale = 1(in):600(ft) E »> BP Alaska Anticollision Report - -- Cornpany: BP Amoco -- Date: 12/17/2007 Time: 15:12:40 Page: 1 Field: Prudhoe Bay Reference Site: PB L Pad Co-~~rdinate(NE) Reference: Well: Plan L-205 (S-G), True North Reference Wcll: Pian L-205 (~-G) Vertical (TVD) Reference: L-205 Plan 76.7 Reference N'ellpath: Ptan L-205L Nc Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/]000 of reference -There are ~I~Hs~ells in thisRlildipal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse i Depth Range: 4589.00 to 8640.91 ft Scan Method: Trav Cylinder North Maximum Radius: 1061.24 ft Error Surface. Ellipse + Casing -- _ __ r y -- g -_ _- . - P - - _.:_ _ _ _ _ P rDefim l t _. _. - - - _ _ - ~ 2/6/2007 Validate No ', Datee de I Version: 3 Planned From To Survey Toolcode Tool Name ft ft -- - 28.50 800.00 Planned: Plan #4 V1 (0) GYD-GC-SS Gyrodata gyro single shots ~ ', 800.00 4589.52 Planned: Plan #2 V1 (1) I MWD+IFR+MS MWD +IFR + Multi Station i~ 4589.52 8640.91 Planned: Plan #7 V2 MWD+IFR+MS MWD +IFR + Multi Station Casing Points 1V1D 'TVD ft, ft 3016.87 2741.70 '~ 4589.52 4051.70 8640.91 4106.70 Diameter Hole SILO m in 10.750 ~ 13.500 7.625 9.875 4.500 6.750 Name 10 3/4" 7 5/8" 4-1/2" Summary - - -- T_ < __..~_._____ OtTset Wetlpatb ------------> Reference ' Offset Ctr-Ctr Nu-Co Allowable Site Well Vi?ellpath' MD 1~1D Distance Area Deviation ft ft ft ft ft PB L Pad L-01 L-01 V14 ', PB L Pad L-02 L-02 V1 PB L Pad L-02 L-02A V5 PB L Pad ~ L-02 L-02AP61 V2 ' PB L Pad L-02 L-02PB1 V21 PB L Pad L-03 L-03 V5 PB L Pad L-04 L-04 V5 PB L Pad L-101 L-101 V4 PB L Pad L-105 L-105 V4 PB L Pad L-106 L-106 V14 PB L Pad L-107 L-107 V14 PB L Pad L-108 L-108 V18 PB L Pad L-109 L-109 V12 PB L Pad ~ L-110 L-110 V11 i PB L Pad L-111 L-111 V24 PB L Pad L-112 L-112 V8 I, PB L Pad L-114 L-114 V15 PB L Pad L-114 L-114A V4 PB L Pad L-115 L-115 V7 I, PB L Pad L-116 L-116 V10 PB L Pad L-117 L-117 V11 ', PB L Pad L-118 L-118 V9 PB L Pad L-121 L-121 V14 PB L Pad L-121 L-121A V1 ~, PB L Pad L-122 L-122 V6 ', PB L Pad L-123 L-123 V5 PB L Pad L-123 L-123P61 V3 PB L Pad L-123 Plan L-123L1 V1 Plan: PB L Pad L-124 L-124 V13 I PB L Pad L-124 L-124P61 V5 '. PB L Pad L-124 L-124P62 V4 PB L Pad L-200 L-200 V7 '~ PB L Pad L-200 L-200L1 V3 PB L Pad L-200 L-200L2 V6 i PB L Pad L-202 L-202 V6 PB L Pad L-202 L-202L1 V8 PB L Pad L-202 L-202L2 V7 PB L Pad L-202 L-202L3 V8 PB L Pad L-204 L-204 V8 PB L Pad L-204 L-204L1 V5 PB L Pad L-204 L-204L2 V7 7437.18 5645.00 675.21 105.52 569.69 9646.19 4590.00 729.25 77.37 651.89 4589.34 5440.00 995.53 82.80 912.73 7817.42 5740.00 804.15 105.69 698.47 8423.64 6265.00 219.40 202.19 17.21 Warning Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk Pass: Major Risk Out of range Out of range Pass: Major Risk Out of range Out of range Out of range Out of range Pass: Major Risk Pass: Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range BP Alaska Anticollision Report Company: BP Amoco Date: 12/17/2007 Time: 15:12:40 Page: 2 field: Prudhoe Bay Reference Site: PB L Pad Co-ordinate(NN:) Refer ence: WeII: Pla n L-205 (S-G), True North Reference Well: Plan L-205 (S-G) Vertical (I'VD) Refere nce: L-205 Plan 76.7 Reference 1~'ellpath: Plan L-205L~NC Db: Oracle Summary i <_____--__--~ - Offset Wellpath ---- --------> Reference Offset Ctr-Ctr ~o-Go Allowable Site Well Wellpath MD MD Distance Arcs Deviation Warning fl ft ft ft ft PB L Pad L-204 L-204L3 V5 Out of range PB L Pad L-204 L-204L4 V5 Out of range PB L Pad L-211 L-211 V6 Out of range PB L Pad L-211 L-211 PB1 V6 Out of range PB L Pad ~ L-212 L-212 V11 Out of range ~ PB L Pad L-212 L-212P61 V9 Out of range PB L Pad L-212 L-212P62 V2 Out of range PB L Pad L-213 L-213 V9 Out of range PB L Pad L-218 L-218 V5 Out of range PB L Pad L-250 L-250 V4 Out of range PB L Pad L-250 L-250L1 V14 Out of range ~ PB L Pad L-250 L-250L2 V10 Out of range 'I PB L Pad L-250 L-250P61 V4 Out of range ', PB L Pad L-50 L-50 V1 Out of range '~ PB L Pad L-50 L-SOP61 V4 Out of range PB L Pad L-51 L-51 V6 Out of range ~ PB L Pad NWE1-01 L-100 V2 5656.79 4570.00 784.26 81.22 703.04 Pass: Major Risk ', PB L Pad NWE1-01 NWE1-01 V5 5656.79 4570.00 784.26 81.22 703.04 Pass: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205 OBb V6 Plan 4590.00 4590.00 0.00 76.32 -76.32 FAIL: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205L1 OBc V9 PI 4590.00 4590.00 0.00 76.32 -76.32 FAIL: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205L2 OBd V7 PI 4590.00 4590.00 0.00 76.32 -76.32 FAIL: Major Risk ', PB L Pad Plan L-205 (S-G) Plan L-205L3 OBa V5 PI 4590.00 4590.00 0.00 76.23 -76.23 FAIL: Major Risk ~~ PB L Pad Plan L-205 (S-G) Plan L-205L4 OA V4 Pla 4590.00 4590.00 0.00 76.23 -76.23 FAIL: Major Risk PB L Pad Plan L-205 (S-G) Plan L-205PB1 V5 Plan: 4589.29 4490.00 368.67 70.87 297.80 Pass: Major Risk ~ PB L Pad ~ Plan L-220 (S-I) Plan L-220 V4 Plan: PI Out of range I PB L Pad Plan L-221 (S-P) Plan L-221 (2xx tgt) V Out of range APB L Pad Plan L-52 (S-E) Plan L-52 V1 Plan: Pla Out of range __ _ I, ~! i FieldPrudhoe Bay SitePB L Pad Well:Plan L-205 S-G) WellpathElan L-205 Nc -3 t 3 300 200 100 0 2 100 200 300 313 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t TRANSMITT/A~L/LETTER CHECKLIST WELL NAME I (f!~ L, ~ ~~~ PTD# Z'y~ '-d~ Developments Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ~' POOL: d~'C6~,~„-, Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter ~' ~ Ocl~ CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit ' f r a new wellbore segment of existing welt L " ~-~ , (If last two digits in permit No. ~~-0~3, API No. 50-~- Z3~ -~. API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Comnanv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water we!! tasting ro ram. Rev: 1/1(/2008 WEi,L PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Weil Name: pRUDHOE BAY UN GRIN L-205L4 Program DEV Weil bore sag ^~ PTD#:2080570 Company BP EXPLORATION~ALASJ~jA ING Initial Class/Type DEV I PEND GeoArea $90 Unit 11650 OnlOff Shore Qn __ Annular Disposal ^ Administration 1 Pe[mikfQaattached-- - --- ----- -- - - - - -- -- ~--- ---- -- -- ----- -- --- ---- -- --- - -------- ---- -- ~2 Jsase number aDRroRriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - - - - - Jyo_ - _ . _ _ _ _ Corrected omission on t0.401:_&u~ loc_it4 toR Drod int in ADL 028239; TD. in ADL 028241. _ _ _ _ _ _ . _ _ _ _ ~ 3 JJnrquev+ell_Ram®andnumber --- -------- -- - - - --- --- Yes-- - ------- -- -- -- -- -- ---- ---- --- - -- -- -- --- ----- ~ ~4 1Nelllocatedin-a.defined_po41_____________________________ __________Yes-_ __.__PBURHOE6AY,ORIQN;;CHRBL OIL-6401$5_governedbyCO.505,__-___-__-.---_.._____..-_ i5 VYall located proper dlstan4e from drilling unii_bounde[y_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ .. _ _ _ The_$ch[ader Bluff Oil Pool shall riot be opened_in any well oloaer than 500' to.an _ _ - - _ _ _ _ . - - _ _ _ - _ - _ _ _ j6 Wflll located proper distance from other v+elis_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes - _ _ _ _ _ - externa# boundary where 4wne[ship changes Spacing units shall be_aminimum-ot 10 acres.. _ - _ _ _ . _ _ _ _ _ . j7 Sufficientaoreageavailableindn[lingunit--------------------- ---.--_.--Yes-- -----Wepbore_conf4[mst4CQ 505,_Ru~2,_________-___.____-.__--.---_-------------- IS If deviated,lsweilb4raplat_included--------- -- ----- - - - --- --Yea-- - ----- - --- -- - ----- -------- - -- - -- -- --- - I 9 O~r~tor4nlyaffe4tedparty--- ---------- - -- - --- - --- ----__ Yes-. --- ---- --- -- -- -- ------- -- -- -------- ------ -- -- -- ------ 10 Operator has.appropriatebandU_f4r4e---------- -- ---- --- - ------Yes-- --------- - -- --- -- ------- -- ---. --- -- -- --- ----- ---- --- ~11 Pe[m+t4anbesauedwith4ut4onservati4norder------------------ ----------Yes-- -------------------------------------------------- - ---- ----- ---- -- Appr Date 112 Pe[m4.canbeisauedwithouladmtnistrative_approval-----.-------- ----------Yes-- -----...------------------------------------------ -- --- -- ---------- ~I13 GanpermJtbeapRroVedbeiore35-daywah ------- -- -- ---Yea-- ---- ----------- -- -- -- --- ----- --------- - - --- -- -- -- ------ SFD 4!812008 ~14 UYalII IocaEed v4thin area a~ atrataeuthori~ed byJolection Qrder# (putiQ~ in- c°mments)_(F4r- Yes _ _ . _ _ _ _ AIO-26- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 AhwelJs_wkhinll4_roile_area-of teviQVridentifiad(F9tservicewe!!only)----- ---------- N?~--- ----.----.------------------------------------------- --- - --------- 18 Pte•produced'injector;duratianofpreprcduokionlessthan3months_(Forsen+icewelloNy)_-.NA--- ----------------------------------------- --- -- -- -- - ------- -- - ~17 .Nonconven.gas.conf4rmetoAS31,05030(1~t.A),11~2,A-D)-- --- -- - -----------~--- -- --- - ----- -- - ---- --------------- -- -- - - --- -- --------- Engineering 18 Conductotst[ingptovided------------------------------ --------.__NA__ ___--ConductoraetinL-205(206-053),--.-----.--------------------------------------- 19 Su[face.casin~luotactsaillcnownUSDWs--------------------- ---------- NA--- -----All aquifersaxempked.40CFR_147.1Q2(b)(3)and_A~01,--------------------------------- 20 CMTvoladequatef4ci[cula#e°n_c4odu4t4r8ssurf_4sg-------------- ----------NA--- -----Sur[a4e4aaing$otinL-205,------------------------------------------------- 21 CMTvoladequatei4tie•in_longstnngtosudcsg__________________ __________NA___ -----Productioncasingset in-Lr205,---_--_---_.--------------------- - --- --- -- 22 CMTwilicoverahkncwn_productiveh4rtzons-------------------- ----------KO--- -.---Siottedlinercompletionplanned~_._-__.____----_.-___-----.--------------------- 23 Caning dea~na adequate for Q, T, 6 &:pe[mafrost_ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ KA- _ _ -- . - _ - . 4[iginel well-met designspecifcations.. NA for slotted linet._ _ _ _ - _ . - _ _ . - _ _ _ . _ _ - _ _ _ _ _ - - . _ _ _ _ _ _ I24 Adequate Tankage o1 reaen+e pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes _ _ _ _ _ - -Big equipped with steel pits. No_reserve pit planned._ All wasie_t4 approved diaRosal well(s), - - - - . _ _ - - - _ - . ;25 ifa_re~drill,has.a10.403f~raband4nmenttleenaRRroved----------- --------- ~-- -------- -- -- - ---- --- ---- ---- --- --- - - ---- - -- ---- - '26 Adequete.vreilgotfl separatioAp[op4sed- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yea _ _ _ _ _ _ - Proximity aneq+sis Rerf_onned, Nearesteegment is 1.3 ta#etal ~ 130' tud deeper _ - - - - - _ _ _ _ - - _ _ . _ _ _ _ _ _ ,27 If dJvertertequited,doeaitmeetroguiati4ns-------------------- -------------~A-- ---.._EQPatackwilialready_~inpiace,-.----_--------------------------------------.- Appr Date X28 Drftling fluid program achgmatic_& equip hat adequake_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ . _ _ .Maximum expectod formation Rressure 8,6.EMW._ MW uR to 9,3_ppg._ - _ _ _ . _ _ _ - - _ _ _ _ - _ - _ _ _ _ _ - - - _ TEM 4110I2008 I29 BOPI=a,.dotheymeeiregulation --- ----- - --- -- - - -- --- --Yea- - - - - -- -- - ----------- ---- ---- -- - - -- - ------ - '30 80P]:_ptesa rating app[opriate; teat to_(put prig in s4mments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yea _ _ - _ _ _ _ MASP calculated at 1470psi, 3500_psi_BQP t®stplanned, _ : _ _ . _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ - _ _ _ _ - - - 31 Choke-manif4ldcamRlie&x~IAPI_RP-53(Mayg4)----------------- -----------Yes- ------------- ~!32 -VN4rkwiil94c~[v~kh9ut_oparationsbutdown. - ---- -- - -- --- --- Yea. --- ---- ----- -- ------ - -------- -- --- ----- -- ---- - -- 33 la presence of }12S gas RrotraDle- - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - No_ _ _ _ _ - _ _ H2S not reported in S6 prgduction-but is p[eaent in lift gas. _Rig has sensors-and a1a[ms, . _ - - _ _ - _ _ _ _ . _ _ _ 34 _h4echani4alc9ndftionofwellawithinAQRverO'iBd(F4rse[vicewellortNa--- ----------- ~-- -- --- --- --- -- -- - - ------- ---------- --- -- - -- --- ----- Geology 35 Permit can be issued wlo hydrogen-sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No- - _ _ _ _ _ - H2S Rrecautions will be followed; no H2s exRecked in reseNOir~but some-occurs in Jilt gas. - _ _ - _ _ _ . _ _ _ - _ ,36 AataRr~ented on Rotential overpressure zones - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes _ _ _ _ _ _ _ Expected reservoirpreasure is 8,5 to i3.6 pD9 EMVV: w~i be drilled with 9.3 pRg.mud. _ _ _ _ - _ _ _ _ _ _ _ _ - - - - _ 00 ;37 Seismicana~fsisofshail4w9aa_~ones ------ - -- --- - -- -- - --- NA-- - ----- ------ -- - ----- --------------- - - -- - ---------- SFD 4181 8 38 Seat~f_c4nditionaurvey_(Ifoffshore)--- --_. -- - --- -- --- --- - NA - ---- --- - ------ -- --- ----- --- ------ --- ------- ----- ------ I39 Coniack_name/phone forweekhr_progresareports[explotatory4nly~_____ ___-____--Yea- ------BObeCtTirRack 907.564-4166-------------------------------------------------- Geologic Commissioner: Date: Engareering Date blic Commissioner: Co missi Date