Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-050• Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~~ - Q ~Q Well History File Identifier Organizing (done) ^ Two-sided III 111111 II II I II III ^ Rescan Needed RESCAN DIGITAL DATA OVERSIZED (Scannable) ~lor Items: ^ Diskettes, No. ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: p~, ~ ~s~ Pro"ect Proofin III IIIII ((III ((III J g BY: Maria Date: ~s~ Scanning Preparation BY: _ Maria _ Production Scanning Stage 1 Page Count from Scanned File: (count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ES NO BY: Maria Date: ~~~',© ~s~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s~ Scanning is complete at this point unless rescanning is required. II (II'I II I II II I I III Rescanned III IIIIIIIIIII IIIII BY: Maria Date: ~s~ Comments about this file: Quality Checked III (IIIII III (III III ~_ x 30 = ~~ + ~ =TOTAL PAGES (Count does not include cover sheet) ~/~/~ Date: ~s~ r r IIIIIIIIIIIIIIIIIII 10/6/2005 Well History File Cover Page.doc Cancel hermit (#208-050) & Sundry ... ~ Page 1 of 1 - 1/14/2010&u McMains, Stephen E (DOA) -- From: Rico Hernandez, Claudia [Claudia.Rico@bp.com] Sent: Thursday, January 14, 2010 3:01 PM To: Schwartz, Guy L (DOA); Davies, Stephen F (DOA); McMains, Stephen E (DOA); Dempsey, David G (Anchorage); Douglas, David W (Landmark); Hubble, Terrie L Cc: Collins, Patrick J Subject: Cancel Permit (#208-050) & Sundry (308-101) Alaska Oil & Gas Commission: At this time BP would like to request that you cancel approved Permit to Drill for 02-39A (#208-050) and the associated Application for Sundry Approval (#308-101). In an effort to clean up database information for this well, a request was made with the. Commission to evaluate some options that would most effectively accomplish this data cleanup. Please refer to the attached document from Mr. Steve Davies that explains the wellbore status. Also attached is the current wellbore diagram. BP has reviewed and agrees with this path forward to correct database information for this set of wellbores. It is our understanding from Mr. Steve McMains that this change will be in effect by the end of the month. And finally, just to be clear, when BP prepares to drill the next sidetrack a new Application for Sundry Approval and Permit to Drill will be submitted. That sidetrack will be named 02-39C (50-029-20721-03-00). Sincerely, Cf ud-ia <~-'. Rico Fernand-ez Petroleum Engineer Gravity Drainage Team -Prudhoe Bay BP Exploration (Alaska) Inc. Office: (907) 564-5626 Cell: (720) 951-3540 «100106_NOTE_PBU 2-39_Name_PTD_and API_Changes.doc» «02-39 Diagram.pdf» 1/14/2010 WELLHEAD = ACTUATOR = BAKER C KB. ELEV = _62' BF. ELEV _ ~ KOP = 2228' Max Angle = _ 96 @ 10926' _ Datum MD = Nq Datum TVD = 8800' SS ads ~~ 40#, L-80, D = 8.835" ~--~ 3666' Minimum ID = 2.350" @ 9260' RCP LINER TOP PACKER TOP OF 2-718" LNR 4-112" TBG, 12.6#, L-80, .0152 bpf, D = 3.958" (TOP OF W H~STOCK 7" GSG, 26#, L-80, D = 6.276" PERFORATION SUMMARY REF LOG: BRCS ON 12/23/96 ANGLEATTOP PERF: 88 @ 10679' Note: Refer to Production DB for historical perf data SIZE SPF INTSZVAL Opn/Sqz DATE 2-1/8" 4 10679 - 10720 C 07/27/97 2-1 J8" 4 10940 - 11240 C 07/27/97 2-118" 4 11300 - 11398 C 07/27/97 2-118" 4 11489 - 11556 C 07/27/97 2-118" 4 11647 - 11780 G 07/27/97 TOP OF CEMENT ~-i 10363' 2-7/8" LNR, 0 ~ ~ ~ ~ ~ SOTES: LDL -LEAK FOUND ~ 9262' at ~ G. HO WELL - 70° @ 10451' 2201' H4-1/2" CAM BAL-O SSSV Nq~, D = 3.813" GAS L~1' MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 4226 3992 38 KBG2LSMOD NVT 2 7$42 6810 39 KBG2LSMOD tVT 3 9697 8259 37 KBG2LSMOD Mff 92~-iRELEASEABLE SPEAR (04120108) 9260' 4-112" RCP LNR TOP PKR, D = 2.350" 9273' 4-1/2 G SETTING SLV 927T 3-112" X 2-7/8" XO, D = 2.441" 7" X 4-1/2" BAKER S-3 PKR 4-1/2" HES X Nom, D = 3.813" 4-1/2" TUBWG TAB WLEG 1 M~LOUT WtVDOW 10330' 12-718" CIBP (05/18/03} ~2-718" CIBP(11/06/99) ~ ~PBTD ~--~ 11807' bpf, D = 2.441" --r 'I 1 I TD 1 DATE REV BY COMMENTS DATE REV BY COMMBVTS 12!96 ORIGINAL COMPLETION 08117/03 CMOIfLP DATUM MD CORRECTION 07/27/97 SIDETRACK 04/26/08 JRA/SV RLSBL SPEAR(TNP)(04/20/08) 02/21/01 SIS-LG REVISION 05/04!08 DED/PJC TREE C/O (04/30/08) 02/02/02 RN/TP CORRECTIONS 04/22/03 BY/TLH CORRECTIONS 05!18!03 DBM CIBP SET PRUDHOE BAY UNIT WELL: 02-39L1 PERMIT No: 1971100 API No: 50-029-22721-60 SEC 36, T11 N, R14E, 316.12' FEL $ 1385.61' FNL BP Exploration (Alaska) • THE CHANGES TO WELLBORE NAMES AND NUMBERS FOR WELL PRUDHOE BAY UNIT 2-39 This note to file is an attempt to sort out the convoluted operations history and permit to drill (PTD) and API numbering associated with the Prudhoe Bay Unit (PBU) 2-39 development well and its subordinate wellbores. The goal is to make needed changes and to adequately document those changes to provide a clear record. Three permits to drill have been approved. by the Commission for these wellbores: PBU 2-39 {PTD 1961820, API 50-029-22721-00) PBU 2-39L1 (PTD 1971100, API 50-029-22721-60) PBU 2-39A (PTD 2080500, API 50-029-22721-01) A brief operations summary for each wellbore will help explain the reasoning for the changes being applied to the Commission's well and production records. PBU 2-39 (PTD 1961820. API 50-029-22721-00) The original wellbore, PBU 2-39 (PTD 1961820, API 50-029-22721-00), spud on December 8, 1996 and reached a total depth of 12,450' measured depth on December 29, 1996. The well was perforated across seven intervals extending from 10,630' to 12,300' measured depth (MD), placed on regular production from January 1997 through April 1997. During May 1997, the well shut in because of low production volumes (for April, the well averaged 54.7 BOPD over 28 producing days). PBU 2-39L1 (PTD 1971100. API 50-029-22721-60) On June 13, 1997, the Commission approved a permit to drill for the PBU 2-39L1 lateral wellbore (PTD 1971100, API 50-029-22721-60}. The operator's intent was to drill a horizontal, lateral wellbore about 1,800 measured feet in length using a "Multi Lateral Access Sub" in the existing 4-112 inch horizontal liner and then run a 2-7/8 inch slotted liner. On July 2, 1997, a window was milled through the 4-1/2 inch liner from 10,714' to 10,719' MD and the new lateral wellbore was drilled to 11,973' MD on July 8, 1997. According to the operations summary, the reservoir rocks encquntered were shaley, so on July 8, 1997 anopen-hole sidetrack was attempted from 11,320' to 11,332' MD, but the effort was not successful. On July 9, 1997, a second open-hole sidetrack was drilled from 11,335' to 11,350' MD, but when the operator tripped the bottom-hole assembly to the window, the assembly became stuck. All fishing attempts were unsuccessful, so on July 11, 1997 the operator pumped 15 barrels of Class G cement to plug back the lateral as well as the original wellbore. Hard cement was tagged at 10,362' MD on July 12, 1997, so the original and lateral wellbores were effectively plugged and abandoned as of, when a new window was milled through the 7-inch casing. • After plugging and abandonment of the original wellbore and the attempted lateral, all subsequent re-drill operations should have been conducted under a new permit to drill and a new well name (PBU 2-39A) and a new API number (50-029-22721-01), but this did not occur, and the operations continued under PTD 1971100. On July 12, 1997, a pilot hole was milled through the cement plug to 10,410' 1VID, and on July 13, 1997, a window was milled through the existing 7-inch casing from 10,411' to 10,415' NID, and a new wellbore was drilled to 10,600' NID. Unfortunately, directional survey data indicated this wellbore had merely progressed alongside the existing casing, so it was plugged back with cement to 10,362' NID. On July 15, 1997, another window was milled through the casing at 10,336' NID, and a horizontal wellbore was drilled. This wellbore reached a total depth 12,309' NID on July 24, 1997. A 2-718 inch line was run to 11,840' NID, where it stopped. Seventeen barrels of Class G cement were used to set the liner from 9,277' to 11,840' MD, and it was perforated across five intervals between 10,679' and 11,780' 1VID on July 26, 1997. The well was put on regular production in August 1997, which continued until December 2007 when the well was shut in, apparently due to its low rate of production. All regular production between August 1997 and December 2007 was recorded against PBU 2-39L1 (API 50-029-22721-60). PBU 2-39A (PTD 2080500. API 50.029-22721-O1) On April 17, 2008, the Commission approved a permit to drill for a re-drill of PBU 2-39. This re-drill was named PBU 2-39A, and its assigned API number was 50-029-22721-O1. At present, this re-drill is not on the operator's drilling schedule, so the permit will expire in Apri12010. Well Name. PTD Number and API Number Changes In January 2010, the operator, BP Exploration (Alaska) Inc., contacted the Commission about correcting inconsistencies with the names and API numbers of the various existing and proposed PBU 2-39 wellbores, and to properly assign production. The Commission's protocol is to assign the combined production from a well and its laterals to the main wellbore. Production is only assigned to a lateral if that lateral produces through a separate tubing string. Production has been erroneously assigned to PBU 2- 39L1 in violation of this protocol, so correction is needed. The following changes to wellbore names and API numbers will be made to clarify the operator's and the Commission's well history and production databases. 1. The original well drilled between December 8 and December 29, 1996 will continue to be named PBU 2-39 (PTD 1961820, API 50-029-22721-00). All regular production occurring prior to July 13, 1997 will be assigned to this well and API number. . i • 2. The wellbore drilled from 10,714' to 11,973' MD between July 2 and July 8, 1997 will be re-named PBU 2-39L1, with a PTD number of 1971101 and an API number of 50-029-22721-60. 3. The failed open-hole sidetrack wellbore drilled from 11,320' to 11,332' MD on July 8, 1997 will be renamed PBU 2-39L1PB1 and any well lag, directional survey, sample or analytical records for this drilled interval will be assigned to PTD 1971101. with an API number of 50-029-22721-70. 4. The open-hale sidetrack wellbore drilled from 11,335' to 11,350' NID on July 9, 1997 will be renamed PBU 2-39L1PB2 and any well log, directional survey, sample or analytical records for this drilled interval will be assigned to PTD 1971101 with an API number of 50-029-22721-71. The original well PBU 2-39 and subsequent wellbores PBU 2-39 L 1, PBU 2- 39L1PB1, and PBU 2-39L1PB2 were all plugged by the cementing operations conducted on July 11, 1997. The abandonment date for these wellbores is July 13, 1997, when a new window was milled through the 7-inch casing at 10,411' MD. 6. The unsuccessful re-drill wellbore that was drilled from 10,411' to 10,600' MD and subsequently cemented on July 13 and July 14, 1997 will be named PBU 2- 39APB 1 and any well log, directional survey, sample or analytical records for this drilled interval will be assigned to PTD 1971101 with an API number of 50-029- 22721-72. 7. The successful re-drill from 10,336' NID to 12,309' MD conducted between July 15 and July 24, 1997 will be named PBU 2-39A and all records for this wellbore will be assigned to PTD 1971100 and the API number 50-029-22721-01. 8. All regular production occurring on or after July 13, 1997 will be assigned to PTD 1971100 and the API number 50-029-22721-01. 9. All printed records for the wellbores assigned to PTD numbers 1971100 and 1971101 will be maintained in the Commission's well history file folder number 1971100. 10. The wellbore name for Permit to Dri112080500, which was approved by the Commission on April 17, 2008, will be revised to be PBU 2-39B, and the API number will be changed to SO-029-22721-02. ~. i~ ~v Steve Davies Sr. Petroleum Geologist January 6, 2010 ~ t_ ~ -~ SARAH PALIN, GOVERNOR ~-75~ OIZ AID ~s 333 W. 7th AVENUE, SUITE 100 COI~TSERQA7'IO1~T COMbIISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Sarber CT Drilling Engineer BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-39A BP Exploration Alaska Inc. Permit No: 208-050 Surface Location: 4512' FSL, 3563' FEL, SEC. 36, T11N, R14E, UM Bottomhole Location: 2161' FSL, 1545' FEL, SEC. 25, T11N, RI4E, UM Dear Mr. Sarber: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter. 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Cath P. Foerster Commissioner DATED this day of April, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ~^~ R~V~~ Y ~D ALAS~IL AND GAS CONSERVATION COMMI~N p PERMIT TO DRILL ~t4 MAR 2 7 2008 >~ ~.~Iv~ 20 AAC 25.005 1 a. Type of work 1 b. Current Well Class ^ Exploratory ^ Development Gas 1 c. Spec' 1 p or: ' ^ Drill ®Redrill ^ Service ^ Multiple Zone ^Coalbed Methane Mates ^ Re-Entry ^ Stratigraphic Test ®Development Oil ^ Single Zone ^ Shale Gas 1 2. Operator Name: 5. Bond: ®Blanket ^ Single Well 11. Well Name and Nu r: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 02- `~~°~~ 3. Address: 6. Proposed Depth: 12. Field /Pool(s): P.O. Box 196612, Anchorage, Alaska 99519-6612 MD 12400 TVD 8807ss Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): 7. Property Designation: Pool Surface: ADL 028308 4512' FSL, 3563' FEL, SEC. 36, T11 N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date: Top of Productive Honzon: R15E, UM 64' FWL SEC. 30 T11N 1839' FSL June 1, 2008 , , , , Total Depth: 2161' FSL, 1545' FEL, SEC. 25, T11 N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 21,000' 4b. Location of Well (State Base Plane Coordinates): Surface: x-688463 y-5950454 Zone-ASP4 10. KB Elevation (Height above GL): 61.5' feet 15. Distance to Nearest Well Within Pool: 500' 16. Deviated Wells: Kickoff Depth: 10270 feet Maximum Hole An Ie: 90 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3257 Surface: 2377 18. Casin Pr ram: S cficatio n To - Settin De th -Bo ttom uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4.1 /g~~ 3-3/16" x 2-718" 6.2# / 6.16# L-80 TCII / STL 2620' 9780' 8264'ss 12400' 8807'ss 145 sx Class 'G' 1 g, PRESE NT VUELC CONDITION SUMMARY (To be completed for Redril{ and Re-entry Operations) Total Depth MD (ft): 12309 Total Depth TVD (ft): 8774 Plugs (measured): 10790 Effective Depth MD (ft): 11801 Effective Depth TVD (ft): 8781 Junk (measured): None Casing Length;, Size Cement Volume MD D Conductor /Structural 110' 20" 260 sx Arcticset 110' 110' Surface 3635' 9-5/8" 1541 sx Coldset 440 sx Class'G' 3666' 3546' Intermediate 10302' 7" 375 sx Class'G' 10330' 8743' Production Liner 2580' 4-1 /2" x 2-7/8" 83 sx Class 'G' 9260' - 11840' 7920' - 8780' Perforation Depth MD (ft): 10679' - 11780' Perforation Depth TVD (ft): 8824' - 8783' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Greg Sarber, 564-4330 Printed Name g Sarb Title CT Drilling Engineer Prepared By Name/Number: 4innatura 111 n Phone 564-4330 Date 2~^~~ Terrie Hubble, 564-4628 ` V Commission Use Onl Permit To Drill ' API Number: i3a'1 t ~~( Permit A proval See cover letter for a Number: O~OcS 50-029-28~ 01-00 `t 1 ~ V Date: ~ other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce C th ane, ga oalbed me s hydrates, or gas contained shales: Samples Req'd: _ ,/ ayes LrJ No Mud Log Req'd: ^ Yes ,_,/ L~J No HZS Measures: ~~C~ S ~ ~~~'~'~ ~` Yes ^ No Directional Survey Req'd: I~Yes ^ No ~ ~ J ~5 Other: APPROVED BY THE COMMISSION Date ~ - _ V ~ ,COMMISSIONER Form 10-401 Revised 12!2005 ~ ~ ~ ~ ~ , ~ Submit In Duplicate b p ~s~~_3~~,~g~ B PXA ~ °^~ ~ t ~ Prudhoe Bay DS 02-3~Q CTD Sidetrack March 25, 2008 CTD Sidetrack Summary Pre-CT Rig Work: 1. Dummy off all GLM's. 2. Drift 4-1/2" liner with slickline to confirm it is possible to recover HES RCP liner top packer. 3. Attempt to fish HES RCP liner top packer with slickline. 4. If step 3 unsuccessful, rig up coil and fish HES RCP liner top packer. 5. After LTP OOH, drift 2-7/8" liner for Schlumberger jet cutter. 6. Jet cut 2-7/8" liner @ 10,280', ref Mem Borax Thermal Neutron log of 27-September-1999. 7. Pickup on cut section of liner and confirm free. 8. AC-PPPOT-IC, T 9. If rig arrives after 7-1-2008, re MIT-IA. (Last MIT was 1-1-2008.) 10. Install a BPV 11. Bleed gas lift and production flowlines down to zero and blind flange. 12. Remove wellhouse, level pad. ~~~' ~~ Rig Sidetrack Operations: (Scheduled to begin on June 1, 2008 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. 3. Pull BPV, load well with KW F. 4. RU Coil. RIH with a GS spear. Recover cut section of 2-7/8" liner. 5. Set Baker TT 4-1/2" x 7" Gen II whipstock with top at 10,260 . 6. Mill 3.80" window at 10,260'. 7. Drill build/turn section with 3.75" x 4.125" bicenter bit, and land well. - 8. Drill lateral section to 12,400'. ; ~~5(ltr;~"r'`~~ " 9. Run and cement a 3-3/16" x 2-7/8" L-80 liner string, abandoning perfs in parent wellbore. \y~ 10. Make a cleanout run with mill and motor and with a SWS MCNL GR logging tool. 11. Perforate well. 12. Circulate well to KWF brine. FP well to 2000' with diesel. 13. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 14. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run live gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75"x4.125" (bi-centeT6its will be used) • Casing Program: fully cemented liner • 3-3/16", L-80 6.2# TCI I 9,780" and - 11,000' and • 2-7/8", L-80 6.16# STL 11,000' and - 12,400' and • A minimum of 30 bbls 15.8 ppg cement will be used for liner cementing. (Assuming TD C~ 12,400', and planning on 40% excess in the open hole interval) • TOC planned at 10,060' Existing casing/tubing Information 9 5/8", L-80 40#, Burst 5750 psi, collapse 3090 psi 7", L-80 26#, Burst 7240 psi, collapse 5410 psi 4-1/2", L-80 12.6#, Burst 8430, collapse 7500 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. .----~ Directional • See attached directional plan. Maximum planned hole angle is 90.0 deg at 10,704'. • Magnetic and inclination surreys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 21,000 ft. • Distance to nearest well within pool - 500 ft. (02-29C, first perforation) Logging • MW D directional, Gamma Ray will be run over all of the open hole section. • Cased hole MCNL/GR/CCL, logs will be run. Hazards • There is not H2S data recorded for well DS 02-39.. • The maximum recorded H2S level on DS 02 was 100 ppm on well 02-29A. • Lost circulation risk is average. Reservoir Pressure • The reservoir pressure on 02-39L1 was last recorded at 3,257 psi at 8,800' TVDSS on 12-29-2008. (7.12 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,377 psi. Greg Sarber CTD Engineer CC: Well File Sondra StewmanlTerrie Hubble FP/C WELW64D= CNV ACTiJ0.TOR= BAI~RC IB. REV = 62' BF. B_EV = _? KOP= 2228' Nfax An = 96 10926' Datum MD = NA Lt3tum ND = 8800' SS 95/8" CSG, 40#, LSO, D = 8:835' 3fi6f Minimum ID = 2.350" @ 9260' RCP LMIER TOP PACKER TOP Ct= 2 718" LNR #, L-80, .0152 bpf, D = 3.958" H 9812' TQP OF WHPSTOCK 10326' 7" CSG, 28#, L-80, D = 8.276" 10330' PERFORATION SUMM4RY REF LOG: BHCS ON 12/23/96 ANGLEATTOP P132F: 88 Q 10679' Note: Refer to Ftoductbn DB for historical pert data SfzE SPF WTEftVAI OpNSgz DOTE 2-1/8" 4 10679- 10720 O 07/27/97 2-118" 4 10940- 11240 C 07/27197 2-118" 4 11300- 11398 C 07Y27197 2-1/8" 4 11489 - 11556 C 07/27197 2-1/8" 4 11647- 11780 C 07!27197 0 2 3 9 L 1 SAFETY RTES: LDL - LEAK FOUND ~ 9282' at G. HORIZ WELL •70 ~ 10451' 2201' 4-112" CAM BAL-O SSSV tom, D = 3_$13" OF ca~evr H 10363' D=2441" ~ GAS LIFE M4PDRgS ST ND ND DEV NPE VLV LATCH PORT DOTE 1 4226 3992 38 KBG2LSMOD RAT 2 7842 6$10 39 KBG2lSMCA PJT 3 9697 8259 37 KBG2LSMOD NT 9260' H4-117' RCP LNRTOP PIS, D = 2.350" 9273' 4-112 G SETTNG SLV 9277' 3-117' X 2-718" XO, D = 2.441" 7" X 4112" BA I~R S-3 PIS 4-112" HES X NP, D = 3.813" 4-1/7' TUBING TAL WLEG MLLOUT WrJDC7~N 10330 107'90' H 2-718" CBP (05!18/03) 11440' 2-7is• clap ~~ m ~ 12310' BY COMNBJIS DATE REV BY OOMMENfS 12196 ORGNAI COMPLETION 1 i ~' 07/27197 SDETRACK 02/21/01 SIS-LG Rla/tSION 0?/02/02 f3J/TP CCRRECTIONS 04/22103 BYlfLH CORRECTIONS 0918!03 DBM CBP SET PRI.JDHOEBAY UNIT WB_L: 0239L1 P~RMT Db: 1971100 API hb: 50-029.22721-60 S~ 36, T11 H R14E 316.12' FEL & 1385.61' FNL ~ Bcpbration Alaska) TREE = FMC WFLLHEAD= GW ACTUATOR = BAKER C KB. ELEV = __ BF.ELEV = 62' __ _ ? KOP = 2228' Max Angle = 96 ~ 10 926' Datum MD = Datum TVD = _ NA 8800' SS 9-5/8" CSO, 40N, L-80, ID • O ~ -3 9 A SAFETY NOTES: LDL -LEAK FOUND ~ 9282' at G. HORIZ W ELL - 70° ~ 10451' P mposed C TD S sietrack 14-1R" CAM 8AL-O SSSV NIP, 10 = 3.813" 3888' Minimum ID = 2.350" ~ 9260' RCP LINER TOP PACKER (SAS I IFT MANORF! S MD ND DEV TYPE VLV LATCH PDRT DOTE 1 4226 3992 38 KBG2LSMOD INT 7842 6810 39 KBG2LSMOD INT 3 9697 8259 37 KBG2lSMOD INT x a-1 L-80, PERFORATION SUMMARY REF LOG: BHCS ON 12!23196 ANGLEAT TOP ~: 88 ~ 10679' Note: Refer to Roduction DB for historical perf data SIZE SPF INTERI/AL OpnlSgz DIATE 2-18" 4 10679 - 10720 O 0727197 2-1/8" 4 10940- 11240 C 0727!97 2-18" 4 11300-11398 C 0787/97 2-1/8" 4 11489 - 11556 C 0727/97 2-118" 4 11647-11780 C 0727hJ7 1152 bpf, ID = 3.958" ~~ 8812' ~- TOP OF CETAENT 10080' 14-112" TU61N0 TAIL WLEO I I 11000' I ~,'~~"_ ~ 10290' ~ CUT 2 7/8' 10350' 2 7/8" CIBP = 6.278' 103$0' 3-3/16 x 2-7/8" LNR crrtd 8 GATE REV BY COMMENTS DATE REV BY COMMENTS 12198 ORIGINALCOMPLETION 08!17/03 CMO/TIP DATUMMDCORRECTION 07127197 SIDETRACK 0281/01 SIS-LG REVISION 02/02/02 RNRP CORRECTIONS 04!22103 BY/TLH CORRECTbNS 05H 8/03 DBM GBP SET I 12400' I PRUDHOE BAY UNfT WELL: 02-39L1 PERMT No: 1971100 AR No: 50-029-22721-60 SEC 36, T11 N, R74E, 316.12' F13 & 1385,61' FVL t3P Expbration (Alaska by ~ BP Alaska Baker Hu hes INTEQ Plannin Re ort g g P INTEQ ~ Company: BP Amoco Date: 3119/2008- Time: 17:34:56 Page: 1 Field: Prudhoe Bay L Site: PB DS 02 Co-ordinate(NE) Reference: WeIL 02-39, True North Vertical (1'VD) Reference: 02-39 61.5 j WeIL• 02-39 Section (VS) Reference: Welt (O:OON,O.p0E,267.00Azi) Wellpath: 'Plan 5, 02-39A Survey Calculation Method: Minimum'Curvature Db: _ Oracle i-- y - -- ~ Field: Prudhoe Ba _ _ _ _ _ _- -- - ', North Slope ', UNITED STATES ', Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 ', Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 ! Site: PB DS 02 TR-11-14 UNITED STATES :North S lope Site Position: Northing: 5948800 .37 ft Latitude: 70 15 53.847 N ~, i From: Map Easting: 687638 .44 ft Longitude: 148 28 58.060 W Position Uncertainty: 0.00 ft North Reference: True 'I Ground Level: 0.00 ft Grid Convergence: 1.43 deg Well: 02-39 Slot Name: 39 II 02-39 'i Well Position: +N/-S 1632.89 ft Northing: 5950454 .23 ft Latitude: 70 16 9.906 N I~ +E/-W 865.72 ft Easting : 688463 .14 ft Longitude: 148 28 32.859 W Position Uncertainty: 0.00 ft ~~ Wellpath: Plan 5, 02-39A Drilled From: 02-39 ~ 500292272101 Current Datum: 02-39 Height 61 Tie-on Depth: 10265.18 ft .50 ft Above System Datum: Mean Sea Level I~ Magnetic Data: 3/5/2008 Declination: 23.43 deg Field Strength: 57674 nT Mag Dip Angle: 80.92 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direc tion i ft ft ft deg 30.60 0 00 0.00 267.00 i -Plan: Plan #5 -- - --- -_ _-_ _- Date Composed:.... _--- 3/5/2008 - --- -- - ---- - copy Mary's plan 5 Version: 10 Principal: Yes Tied-to: From : Definitive Path Targets Map Map <--- Latitude ---> <--- Longitude --? ; Name Description TVD +N/-S +E/-W `-Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft 02-39A Polygon 61.50 3278.10 3750.33 5953825.00 692130.00 70 16 42.137 N 148 26 43.641 W 'I -Polygon 1 61.50 3278.10 3750.33 5953825.00 692130.00 70 16 42.137 N 148 26 43.641 W ', -Polygon 2 61.50 3316.98 3396.18 5953855.00 691775.00 70 16 42.521 N 148 26 53.954 W ', -Polygon 3 61.50 3097.85 1960.15 5953600.00 690345.00 70 16 40.371 N 148 27 35.776 W ', -Polygon 4 61.50 2882.15 1984.76 5953385.00 690375.00 70 16 38.250 N 148 27 35.061 W -Polygon 5 61.50 3004.59 2688.09 5953525.00 691075.00 70 16 39.452 N 148 27 14.579 W ~, ', -Polygon 6 61.50 3006.43 3413.41 5953545.00 691800.00 70 16 39.467 N 148 26 53.457 W '~I -Polygon 7 ' 61.50 2919.31 3696.33 5953465.00 692085.00 70 16 38.609 N 148 26 45.219 W !, I , 02-39A Fault 2 61.50 2466.03 1624.21 5952960.00 690025.00 70 16 34.158 N 148 27 45.564 W ~ ', -Polygon 1 61.50 2466.03 1624.21 5952960.00 690025.00 70 16 34.158 N 148 27 45.564 W -Polygon 2 61.50 2941.92 1396.04 5953430.00 689785.00 70 16 38.839 N 148 27 52.205 W i 02-39A Fault 1 61.50 2793.87 3112.97 5953325.00 691505.00 70 16 37.378 N i 148 27 2.208 W ' -Polygon 1 61.50 2793.87 3112.97 5953325.00 691505.00 70 16 37.378 N 148 27 2.208 W ', -Polygon 2 61.50 3027.07 2988.77 5953555.00 691375.00 70 16 39.672 N 148 27 5.822 W II -Polygon 3 61.50 3605.06 2678.12 5954125.00 691050.00 70 16 45.357 N 148 27 14.863 W I -Polygon 4 I 61.50 3027.07 2988.77 5953555.00 691375.00 70 16 39.672 N 148 27 5.822 W II 02-39A Target 1 8851.50 3109.74 3642.08 5953654.00 692026.00 70 16 40.482 N 148 26 46.796 W 02-39A Target 2 8852.50 3128.58 3209.39 5953662.00 691593.00 70 16 40.669 N 148 26 59.396 W 02-39A Target 3 8860.50 3082.38 2497.97 5953598.00 690883.00 70 16 40.217 N 148 27 20.115 W '~~ 02-39A Target 4 8869.50 2940.76 2001.24 5953444.00 690390.00 70 16 38.826 N 148 27 34.581 W III by ~ BP Alaska Baker Hu hes INTEQ Plannin Re ort g g P 1NTEQ Company: BP Amoco Dater 3/1.9/2008 Time. 17:34:56 Pager 2 I Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-39, T rue North Site: PB DS 02 Vertical (TVD) Reference: - 02-39.61.5 Well: 0 2-39 Section (VS}Reference: Well (t).OON,O .OQE,267 .OOAzi) Weppath: Plan 5, 02-39A Survey Calculation Method: Minimum Curvature Db: Oracle Annotation MD TVD ------ ---- - - -- ft ft ~ ', 10265.18 8704.25 TIP 10270.00 8707.37 KOP !~. 10290.00 8720.04 End of 9 Deg/100' DLS ', 10320.00 8737.22 4 10350.00 8751.89 5 10580.00 8837.32 End of 27 Deg/100' DLS ', 10704.27 8850.64 7 110954.27 8850.65 8 '~, 111104.27 8851.06 9 11304.27 8852.84 10 ~i 111504.27 8855.18 11 !, 111704.27 8858.03 12 111904.27 8860.64 13 ~i 11955.00 8861.08 14 112135.00 8862.58 15 '~ 12400.00 8868.32 TD , Plan Section Information - '~ MD - Incl Azm TVD -- +N/-S +E/-W DLS Build Turn TFO Target - - ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 10265.18 49.29 27.40 8704.25 2796. 61 3809.66 0.00 0.00 0.00 0.00 10270.00 49.93 26.85 8707.37 2799. 87 3811.34 15.87 13.28 -11.41 326.61 10290.00 51.49 25.70 8720.04 2813. 75 3818.19 9.00 7.82 -5.75 330.00 10320.00 58.61 20.97 8737.22 2836. 32 3827.87 27.00 23.71 -15.78 330.00 10350.00 62.90 13.09 8751.89 2861. 33 3835.49 27.00 14.30 -26.26 300.00 10580.00 77.69 308.32 8837.32 3049. 51 3763.32 27.00 6.43 -28.16 270.00 110704.27 90.00 299.84 8850.64 3118. 46 3661.22 12.00 9.90 -6.83 325.00 I ~I10954.27 90.00 269.84 8850.65 3181. 74 3422.30 12.00 0.00 -12.00 270.00 I 111104.27 89.69 251.84 8851.06 3157. 95 3274.83 12.00 -0.21 -12.00 269.00 11304.27 89.31 275.84 8852.84 3136. 64 3077.44 12.00 -0.19 12.00 91.00 11504.27 89.37 251.83 8855.18 3115. 32 2880.06 12.00 0.03 -12.00 270.00 11704.27 89.02 275.83 8858.03 3094. 00 2682.69 12.00 -0.18 12.00 91.00 :.11904.27 89.51 251.84 8860.64 3072. 68 2485.31 12.00 0.25 -12.00 271.00 '1 11955.00 89.51 245.75 8861.08 3054. 34 2438.04 12.00 0.01 -12.00 270.00 112135.00 89.55 267.35 8862.58 3012. 72 2264.02 12.00 0.02 12.00 90.00 '....12400.00 88.03 235.58 8868.32 2929. 59 2016.03 12.00 -0.57 -11.99 267.00 Survey Mll Inch.' Azim SS TVD - N/S - - E/W MapN ' - MapE DL5 --- VS TFO Tool j ft deg deg ft it ft ft'` ft deg/1'OOft ft deg 265.18 49.29 27.40 _ _ 8642.75 __ 2796 .61 3809.66 5953345.18 692201. 36 0.00 _ -3950. 80 0 .00 _ MWD 10270.00 49.93 26.85 8645.87 2799 .87 3811.34 5953348.48 692202. 95 15.87 -3952. 65 326 .61 MWD 'I 10290.00 51.49 25.70 8658.54 2813 .75 3818.19 5953362.53 692209. 45 9.00 -3960. 21 330 .00 MWD 10300.00 53.84 24.03 8664.60 2820 .97 3821.53 5953369.83 692212. 61 27.00 -3963. 93 330 .00 MWD ', ~ 1 10320.00 58.61 20.97 8675.72 2836 .32 3827.87 5953385.34 692218. 57 27.00 -3971. 07 331 .01 MWD 10350.00 62.90 13.09 8690.39 2861 .33 3835.49 5953410.52 692225. 56 27.00 -3979. 99 300 .00 MWD i. 10400.00 63.71 357.99 8712.96 2905 .61 3839.77 5953454.90 692228. 73 27.00 -3986. 57 270 .00 MWD 10500.00 69.73 329.27 8753.17 2992 .34 3813.75 5953540.94 692200. 55 27.00 -3965. 13 276 .81 MWD 10580.00 77.69 308.32 8775.82 3049 .51 3763.32 5953596.83 692148. 70 27.00 -3917. 76 288 .38 MWD 10600.00 79.66 306.92 8779.75 3061 .48 3747.79 5953608.40 692132. 88 12.00 -3902. 88 325 .00 MWD 10700.00 89.57 300.12 8789.13 3116 .32 3664.92 5953661.15 692048. 66 12.00 -3822. 99 325 .27 MWD ', ', 10704.27 90.00 299.84 8789.14 3118 .46 3661.22 5953663.19 692044. 91 12.00 -3819. 41 325 .92 MWD 10800.00 90.00 288.35 8789.15 3157 .47 3573.97 5953700.00 691956. 72 12.00 -3734. 32 270 .00 MWD 10900.00 90.00 276.35 8789.15 3178 .81 3476.46 5953718.90 691858. 72 12.00 -3638. 07 270 .00 MWD ~ 10954.27 90.00 269.84 8789.15 3181 .74 3422.30 5953720.47 691804. 50 12.00 -3584. 13 270 .00 MWD 1 11000.00 89.90 264.35 8789.19 3179 .42 3376.65 5953717.01 691758. 93 12.00 -3538. 42 269 .00 MWD '~, '~, 11100.00 89.70 252.35 8789.54 3159 .26 3278.89 5953694.41 691661. 71 12.00 -3439. 74 269 .00 MWD 11104.27 89.69 251.84 8789.56 3157 .95 3274.83 5953693.00 691657. 68 12.00 -3435. 61 269 .05 MWD 11200.00 89.50 263.32 8790.25 3137 .40 3181.49 5953670.12 691564. 90 12.00 -3341. 33 91 .00 MWD by ~ BP Alaska Baker Hughes INTEQ Planning Report LNTEQ Company:. BP Amoco Date: 3!19/2008 T-me: 17:34:56 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-39, True North Site: PB DS 02 Vertical (TVD) Reference: 02-39 61.5 ~ Well: 02-39 Section (VS)lteference: Well (O.OON,O.OOE,267.OOAzi) j Wellpath: PIan;S, 02-39A - -- --- Survey Calculation Method: Minimum Curvature Db: Oracle - _. _ __ J Survey MD Inc! Azim SS TVD N/S -- E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft, ft' deg/100ft ft - deg _J 11300.00 89.32 275.32 8791.29 3136.22 3081.69 5953666.44 691465.16 12.00 -3241.60 90.92 MWD 11304.27 89.31 275.84 8791.34 3136.64 3077.44 5953666.75 691460.90 12.00 -3237.38 90.79 MWD 11400.00 89.32 264.35 8792.48 3136.79 2981.88 5953664.51 691365.37 12.00 -3141.96 270.00 MWD 11500.00 89.37 252.35 8793.63 3116.63 2884.12 5953641.91 691268.16 12.00 -3043.28 270.14 MWD 11504.27 89.37 251.83 8793.68 3115.32 2880.06 5953640.50 691264.13 12.00 -3039.16 270.28 MWD 11600.00 89.18 263.32 8794.89 3094.76 2786.74 5953617.61 691171.35 12.00 -2944.88 91.00 MWD 11700.00 89.02 275.32 8796.46 3093.58 2686.94 5953613.93 691071.62 12.00 -2845.16 90.85 MWD 11704.27 89.02 275.83 8796.53 3094.00 2682.69 5953614.24 691067.36 12.00 -2840.94 90.67 MWD 11800.00 89.24 264.35 8798.00 3094.15 2587.13 5953612.00 690971.84 12.00 -2745.52 271.00 MWD 11900.00 89.50 252.35 8799.11 3073.99 2489.38 5953589.40 690874.62 12.00 -2646.84 271.18 MWD 11904.27 89.51 251.84 8799.14 3072.68 2485.31 5953587.99 690870.59 12.00 -2642.72 271.31 MWD Ii 11955.00 89.51 245.75 8799.58 3054.34 2438.04 5953568.47 690823.80 12.00 -2594.55 270.00 i MWD 12000.00 89.51 251.15 8799.96 3037.81 2396.20 5953550.91 690782.39 12.00 -2551.91 90.00 MWD I, 12100.00 89.53 263.15 8800.80 3015.62 2298.89 5953526.28 690685.67 12.00 -2453.57 89.95 MWD 12135.00 89.55 267.35 8801.08 3012.72 2264.02 5953522.51 690650.88 12.00 -2418.59 89.85 MWD 12200.00 89.14 259.56 8801.82 3005.32 2199:50 5953513.49 690586.57 12.00 -2353.77 267.00 MWD 12300.00 88.56 247.57 8803.84 2977.08 2103.78 5953482.88 690491.59 12.00 -2256.70 267.09 MWD i 12400.00 88.03 235.58 8806.82 2929.59 2016.03 5953433.21 690405.07 12.00 -2166.59 267.33 MWD I B P Alaska .L ~ _ BAK~R LEGEND .~ +.at mz tr zte - 02-39 (02-39) ~~~ ~ p:: L,eama 02-39102-39L1) oz-3sloz-3sLIPB1) Ma,~nkN~, zt - wFEVaTa oOTeaa ^~~ u- ~~ ^1~/6R - . . 02-39102-39L1PB2) mw ' mn - Plan 5, 02-39A vre s~-s~i Plan#5 sia ~ w~uii ei3iat ~ Pamn1 YNIIP+eN: 03-19 TIO on YD: 10385.10 al : 1NTEQ a, Miwaiw, ^~:°~,~; ~~ 10011 w,-]36]6 Email. Oui mtinaeison®inYpwm a 11x1. Datwn. 03x9 61.00/1 YY pq~ ~~gN1 V.B ~rglo ~µMli ~Fl-1V FniTVD o ~ 0310 02lOLt • 0 033 0338Lt Pal ... 30).00' OAO 000 ]0.60 - ~I. "(~ I :. i y --.._.. BEFEHENCE NfOHMAT ON -. I i 1 1 ~ _ - ]-~ i , t l T f i _ 1~ -' ~ ~ . [-i. ~ ~ l Co Ven~ca( VpIB' 033961.50 23 Tne NOM Setl IVS) 5 391 00 OOOE) k1V _ r,l T ~I ~ ~~ 11 -. .. r.l- : --} ~ t µ 'Tj. .. l~ r`fT- . - t + }-, ii r L, - t- T I F 1 1 1 '- I •~ 1111 ~' - -T ~ ~ Mee~ure 0 H 02 3 6 50 at nn Metl' mC rvatur m .. 1 -r t I ~ + } •-1-Y ,7 1 ~ -- I - t{{_ ~ 1- +Y - - t ~- I ~ ~ - - ~ . - e ~~ ~~ ~ _- - _ .~ r.. ~ ..1.Te6 Yn..a 3~ -- n : - .... ... ,.., >o.a1 ..o. ..~,... . A u ' ' i _ + : ,r_, , . n a ~ :r w.t ,w~ ~. ~--- ~~ :,~~ ~ ~ "' ~ ,ot. ~ u 1.,6Y.. .. ;~ __ _ - _ ~ D3.36 D336L,..3 ,. ~ [6n6w3,wa~ NNO1.1aN: 1 <~s ~ I T~6 aP M,~,a1w~ ~~ ~ .,,D.r,66D1, ~ ., 3, D..,6D D1A 3tA 1 ~ ~ 166666 ,~6,6 356, ~. P _~ n .~ a o a a ~ ~~ o _i ~ ~ r[ ~ '' ..66.6.,,..3, „ _, a ~r , 6mt3.666F Ta ,., ~ffr- ' -~_~ . 1 '~ r' ~f ~' ~~ ii T ; t+ ~+,'.: `~ ~' fi - - ~ ~~ ' ~' 3~ _ ~ ] t f 1 1{ } 1 r [ [ r , ~ . :: '- - ;r-..: .. .. ~ _ + 1'j ' tTr ~ ! ~ ~ _ I~ t{tT ~ f I t { ' 1 :~i ~ $ - ~ ~- - _r .- i F ~ s.~_. ` 1 il , t, I - + ~ _ ' .... .: ... .. .:_ L:_ . _. _ 1 h .-- - ~ ~V ,{ -_ I .L1: r _ ~ 1 [ ~ t ~ h ~ 11 - 1~ i~* * I } if ,~ r _ taxi- .. .. - I ~ ~-- - ~ - 1t - _..: ... -r ' ,~~ -- ' r ,,~ - - -- T ~_ -, + `-r r ~ i ~) , ~ ~r ~l [ r ~ ~ ~ ~-~ „m Apo ~ z~m za z z~ t ~ ~ ..., ~ ~ ~ >el~ ~, 3,oa r~ t~ ~ 1391 ~ 3,tt ~~ 3600 ~ ,~ .w9 .,~ .3w .>~ 3 ~ f r f ~ ~ "+ " I) 1 . ~ weay-liea:ry.] ~TOOanD] ab ' ' U N ~D.ytoo~DU1 ~ ° I i rr 1~ . ,' li ~ l ri ~~ I - I ' :'+` r t!+t~r- n~i t ]7 lr >~-r.: ~t, 1 i I 1 I r I J II , I t f f i- rl ' ± t' ~ { ~% ' 1 1 I r ( ., - l ________ a ~ I 0 , ~ D aa.~~r. .1Ji - - . .-I _ ` ~ a ll O LJ L'J 0 I O ~.. :. ~ : o o © ~~ : ~ ~I t~ l ~ L~6~ 1 } FI : _ _ _ _ _ _ l ~ -- _ a I~ I .:: I _ _ _ 1 ~ .. - _ . I I , ] ~' ~~ ~- I t i i II f 11 ~:: ~ ill - , ~)-~ ~ 1;- ~, r~ T i~~1 - 1~ I,~ ~ ~ t~ fri 1 }t ~ Iirr I t~ ~ ~ ~ E }- F i ~ { ~ i-1~t y~ i~l~ - i~~ ~ r i.~ _.. 1,{ jt r_, } i .:t ~tl $-~rt.. _ ~-I ~ - Tr r' ' . tooo-" _ , i i . . - + r i I -F [ } I ~ j-I r-1- 1-F rl a t -;~ ) y ..;. ) '~' ~I T I~ 1 ~~ "' ,~ ~ ~lii ~ ±?I ~ f ' ~ ~f f.~ a - ~ i~ I, rr +i + ir ~ r ~ I I ' 't ~ '~ f ~ ~ ~ ~ t.~ 1_~ ~. r I :Il I ~ lt .ff! 'I ~~;~ r •i IJ f_ ., [ . ~ 1_ r tT ~ +; I ~ T I~ ~~ ~ ~ ' r~ r t k, - ~ 1 I 1# k I~_... t f_f .. t~- : i r ~`1- t~t ~ t , ~ ~ r t -~{ '~-~ -rt _ ~~ Ttl ~~ r 4 ti --`.. " i 1 i. - 1 ~i -I- r-- ~r i~~~~ . ~ 1 - + _ t I- 1 _ ] 1 1 1 11 ~ t I II I 1 .. ~ ~ ~ { ~ ~ `~ 1 T 7 ~ k L ~ ~ ~ ~ 1 ' ~ ~-~. 1 .~ t i - l T - s i I i r _ T _ - ~ ~ -1 - I 1- I~ ] ~-f ~ '' i i_- E T i 1{ i.. I ~ { I . T• 1 t I z t I I . 1 f .. ~+ ' f ~ 1 F t _ r t 1 { i r , l - T. . ~ -~, r.-. ~ ~ ' - r ~ 1 .. 1 I I i ~ l l I <wa -38 w u w0 Se w -3a ot a1w azw -two a0m a wo .t wo -t am -11 01 53 w 3 _.. wo ie w u zou t, V ,~I~~ su S,oo Soso ;n ertical Section at 267.00 [50ttlin] w ,n = :n~~. . .. _. ~,. . ,.~.. .u ~ ~~~ ~ ~ ~ ~~ , . .. ... ~ECe" T Plan: Plan p5 (02-39/Plan 5, 02-39A) erAalaz~/1Bl rig BP Alaska a~lo~z uei I _ M / imurhs ro True NOM Crealetl By aP Dale: 31191'2006 ae 02-0'[~/ MagnerK NOrN. 2343° Checked: Cla;e B1l /r~~ Ma9nere field _ weLVarn oeuas ioi~oi:wei BNUGNE by Soio~Aoe~~eo sir u.~u~r i~nae,aroe wroias§iiziol ^2a-a^ Moaete. ~srzooi enl Mitliaelxori _ ~~I=-0s~ ~ NTEQ e99m P. a:-ae as~z~°~a,l ,1, r~e4.s ,aaca.,. ~roz~A a~.: ~a, roan.nr e,V M: o~faero~r. as ~'r"ria zoa~oz~~ a,1 !, ~a>.4a~ a.4u 4.00 ~.w _ as 1oz ~~a„ I _ oa roeoear REFERENCE INFORMATION -as ~s csnp Coordinate (WE)) Reference: Well CenUe: 02-39, True NOM as ry.~aaezj '~, Vediral(ND)Reference: 02-3961.50 - oa rczrrievarl Section (VS Reference: Slot - 39 (O.OON,000E) as roe-osc~ Meas r tl Depth Reference: 02-39 6150 ~o rozrol u e 1~ Calcul t Mthoa. M C rvature r _- ~,prl --. -. 12-rtnl -.-_ - _ _- sec o rn< ~r rvs .w-s .uw otes nece sec Tersel r~pp tjgni sECTloa sETMU jj (o2-I]ArGPII la ~oz-later ra ryz-reel ', ii 10'21-r~nr r -1515 ~i NR 1~5PPatr -_ ~a dz r~, I - ;630= s~4 I - raga-3ecfan 1,>uzr,~i cioz" r ,aa, - .a raz_ra~a,r __ :ra rOR~,e~l a„ =~3ozp; I 3900-~ - - _---- - - 02-97102.77 02.37102.37L11' - .... _.. _. '~... ,_,_.... 02-3811 02-3aL1)j ~ 02-39 02-39L1 9 ~ 02-79 02-39L1 PBt~j' _._ 3800 ' I r ' ~ ? ~_ - ] _ 3700 { - - -f - tr t. .. t t 1 rTT I T Y t r - t _ ~I i I t t ,r' _ _ .~.{ ~ ~ K ~ ~ -~ ~ + 1 - Y { i r-F - lH~ 1 } + ;~ _ ~ 02-09102-o9H1 ~+1~ ; _. - --- ~. ~ -,- ! ~ ~ . t rr 3600, - {t ~ - ~ 1T - ~' i ~. ~' r _ - i -=`f ~ f ~ , 1 r f~I r t+ r t tr i~ r f I ~ 'Ir ~ it ~ I ~ ~ ~ ~- fls ~ ~ r~ E~~ 3soo- - -~- ~ I ~ . ~ .. { ~. _ ±r ~' r- { ~ ....: r f ~ '1 1 ~ .. _ - - t - ~. +r f 1- 3400. { 1 __L + ~ L 1 ~ Yt} f + t r. ~ ~r1 ~~ t+ ~ {- 1~ }k -~~ f 1 _:i I I :. .. r } l+t ..I ~f .-r :i ..~/... - {- ~ ~j._: ~~1 ~` r ~ i H ^3200- , rt r.~ I~ I i `` I ~ ~~ ~. ~. 1 } ..... , , ... ~j i t ~ -~-, 1 f 1::}-._ 1 ~ } {.: >~ ti t,~f ~ r ~. ~_ r+ , F~ ~ ~}) I . t-1 r I } e7oo - - ~ , ~ 1 I~ ,ere, - ~ ` _ ~ Y... t ~ {...~ ~ ~ ,} _ ....+ 1.. + r ~-- 1 rr--~1 -~ 3100- - _ 02J9 02-39L1PB2 ~ _ _ 1 } 1 3000-. -_ ~ +-~~ r ~ ~ ~ . 6700 Plans 02-39A ) I { :~ r~ {: ~- -~ 1 } ~~~~: ~ . t r j 4-.. =zsoo-- 02-os o2.o9c / - r ,- :1. _ ,.~ ~ L~ - t ~ ); .. + s Bo _ i ~ +If tk { t { C i + ; ' I e7oo ~ ' ~ I III I {, I } l 2800 2700_ r._ ` -. _ 6oD 4 .~ . 7 600 - .._- .. ~.~ _ ~ 1 r i ~ ~ it Tf{~ ± ~~ .... ~ .; 17 ~, 8000 ~ .. .: .~ ___ •~ 81 0 ~ ~ ~ 7600 / 1 ~ ~ 02.29A~02-29G # r ~ ~ -' . - .. ' zsoo- r j / - I .. _ -T~ { ' ~. zsoo : 7800 . _ _ 7. ~ r {.. t I~ I ~ __ I I i {r ~ t t 'i } . ~ • , r _ __ I~ ~ .~~ _02-09 o2-o9BPB~ r- -~ eroo ~ ~-~- t ~~ - Ft ~ . f ~ ~-,' 7500 ~ - / _ I { rr, I - .. 62-02 62-02APB, ._ , ~ ~ , _~~ ~ {-.. ~ i ~~, rtf j 1 02-09102-os)I zzoo ~. 7200 ,_.._ i ~.. ~ - e7oo ~i. l I .. .. h. - .9000 soo oz-02102-02A1 I ~ F 2100 ~ 08AP82 A .. - r r ... - 02-02 02-02A . i? ifTTrr, . .. 7 T fiT~r, r ~ , 02.09 oz•, ~ ~ • r I r{ r ~ - f r r - - ~ _ _ r ._~r;~ 1-- -r`T ,-r r , . , . T i--, . , ~ ~,~ ~ , I T1_,~~--.. 1 r~~ 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2300 2500 2600 2700 2000 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4700 4200 4300 4600 4500 d600 4700 4800 4900 5000 West(-)/East(+) [100ft/in] WCLL nhfAILS ANTI-COLLISION SETTINGS mmrnnv uw'nas scxvev rxouxn.H wr~_i_rnm nrrnus ~N/-8 'l:/-W Northing Casting Lalitudc Longitude Slot xr.a,"K° i><rm r-m tkrm ro s,u..ymw, i~~m riw, s. u?~~vn >Ix~1Yd1]?IUI Interpolation MethodMD Interval: 50.00 ,,U,~,~,,,,, _N„~„~. H;,,,,,,,,,,,cw,w~.~ mxa in iz.wuuu nywm n,,, ~~s vv v,wu 163?.ri9 %65.72 5950454.?3 firi84fi3.14 70°Ifi'09.906N 148°'_K:3?.859W 39 Depth Range Erum: 10265.18 To: 12400.00 1 na 1 Maximum Range 14}6.94 Reference: Plan: Plan q5 ~, ,n,,, . t r "'~ '-°'-'" x t uu°m_ n~~y%. n7xx ,~, o., ~~ ~°U ~`~i ~ ,a 1ruo . ~~yat Ire ~°" ~~ '~y 117809 ,. ' ~' ~: ~~ ,~, Ibrws /ocs~ uxal °' ~us7?~9szQ ~~ 44 a o, ~~ ~„yam ;sa~~r \ yZ ~ 11814 °„ l 6!~ ,~ ~4 .. o ~ ; ~s r ~. ~t q Lec,euo 02-01B (0~ OIB) Major Risk 02-02 (0~ OVA) Mayor Risk 02-02 (02-02APB1), Major Risk - 02-09 (02 09), Major Risk - 02-09 (02 09A), Major Risk - 02-09 (02 09AP61), Major Risk - 02-09 (02-O9APB2), Major Risk - 02-09 (02-O9B), Major Rlsk - 02-09 (02-O96P61), Major Risk 02-09 (02 O9C), Major Risk 02-29A (02 296), Major Risk 02-29A (02 29C), Major Risk 02-29A (02-29CP61), Major Risk - _- 02-37 (02-37), Major Risk 02-37 (02-37L1), Major Risk 02-38 (02-38), Major Risk 02-38L1 (03-38L1), Major Risk -- 02-39 (02-39), Major Risk - 03-39 (02-39L1), Major Risk 02-39 (02-39L1 PB I ), Major Risk - 02-39 (02-39L1 P62), Major Risk Plan 5, 02-39A - Plan #5 by ^~'~' INTEQ fi,l~ , z,~ - - - 1x~13a I,W - - - n°z~~ - ~ti19 - - d,;,~v - ;,, ~,a9 - - - ;~,o:~~ ~_W t4~sa, - =,,a ,,,,~ z~d;~ - - ,~39,a - .,a. - - - eeci~a ?4snaa lam zzea.az Izm ie Gann anz,3 _ssse a~e.iz ?rissv _mo.m iza _e~m -ziiss9 • bP ~ BP Alaska Anticollision Re ort P BAI•f3~R ' ~s 1NTEQ Company: BP Amoco Date: 3/19/2008 Time: 17`04:04 Page: 1 Field: Prudhoe Bay , Reference Site: PB DS 02 Co-ordinate(NE) Reference: Well: 02-39, True No rth Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61. 5 ~ Reference:Wellpathc Plan 5, A2-39A Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are'i2e[ells in thislFieldtipal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 10265.18 to 12400.0 0 ft Scan Method: Trav Cylinder North Maximum Radius: 1436.94 ft Error Surface: Ellipse + Casing . _ __ -- ----- _ _--- _ --- -- p _ __ _ r Surve Pro ram for Definitive Well ath Y g __ --- __ i Date: 3/5/2008 • Validated• No Version: 0 Planned From To Survey Toolcode Tool Name ft ft 30.60 10265.18 1 : MWD -Stand ard (187.74-123 MWD MWD -Standard 10265 18 12400.00 Planned: Plan #5 V9 MWD MWD - Standard Casing Points MD TVD Diameter Hole Size Name ~I ft ft in in - - I - r 12500.29 0.00 -- -- 2.875 4.125 2 7/8" - - -- 1 Summary ~, <-------_--- Offset Wellpath ---- ------> Reference Offset Ctr-Ctr No-Go Allowable ~~ Site Well ' Wellpath MD MD Distance Area Deviation Warning ft ft ft" ft ft' ~I PB DS 02 02-01 B 02-01 B V1 Out of range PB DS 02 02-02 02-02A V1 Out of range ', PB DS 02 02-02 02-02AP61 V1 Out of range PB DS 02 02-09 02-09 V2 Out of range PB DS 02 02-09 02-09A V4 Out of range PB DS 02 02-09 02-09AP61 V5 Out of range PB DS 02 02-09 02-09AP62 V9 Out of range i, PB DS 02 02-09 02-096 V6 11969.95 10950.00 102.50 658.60 -556.11 FAIL: Major Risk PB DS 02 02-09 02-096P61 V3 Out of range 'I PB DS 02 02-09 02-09C V7 Out of range i PB DS 02 02-29A 02-296 V6 Out of range PB DS 02 02-29A 02-29C V3 11541.28 11409.50 570.50 269.59 300.91 Pass: Major Risk PB DS 02 02-29A 02-29CPB1 V1 11575.00 10870.50 1068.50 261.80 806.70 Pass: Major Risk i ', PB DS 02 02-37 02-37 V3 Out of range PB DS 02 02-37 02-37L1 V3 12400.00 10300.00 848.11 308.66 539.45 Pass: Major Risk '~, ', PB DS 02 02-38 02-38 V1 11774.01 9850.00 168.68 240.73 -72.05 FAIL: Major Risk PB DS 02 02-38L1 02-38L1 V1 11773.83 9850.00 169.72 240.72 -71.00 FAIL: Major Risk ~'~ PB DS 02 02-39 02-39 V2 10300.01 10300.00 0.39 316.15 -315.76 FAIL: Major Risk PB DS 02 02-39 02-39L1 V3 10349.89 10350.00 1.74 325.19 -323.45 FAIL: Major Risk ', PB DS 02 02-39 02-39L1P61 V1 10300.01 10300.00 0.39 319.64 -319.25 FAIL: Major Risk it PB DS 02 02-39 02-39L1 P62 V1 10349.89 10350.00 1.74 325.19 -323.45 FAIL: Major Risk Site: PB DS 02 Well: 02-09 Rule Ass igned: Major Risk Wellpath: 02-09B V6 Inter-Site Error: 0.00 ft R erence Offset Semi-Major Axis - Ctr-Ctr No-Co Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSi)istance Area Deviation Warning i ~ ft ft ft ft ft ft` deg deg in ft ft ft 12130.49 8862.54 10500.00 8868.35 42.54 140.53 176.10 269.29 2.875 467.17 595.11 -127.93 FAIL ~, 12123.91 8862.49 10525.00 8867.71 42.95 142.09 175.35 269.33 2.875 445.74 601.01 -155.27 FAIL ~I 12117.06 8862.43 10550.00 8866.94 43.37 .143.69 174.59 269.39 2.875 424.44 607.09 -182.64 FAIL ~i 12110.22 8862.38 10575.00 8865.84 43.78 145.26 173.88 269.51 2.875 402.97 613.07 -210.10 FAIL ', 12103.28 8862.32 10600.00 8864.54 44.21 146.82 173.21 269.67 2.875 381.43 619.04 -237.62 FAIL 'i I ~ 12095.98 8862.26 10625.00 8863.21 44.64 148.43 172.52 269.85 2.875 360.09 625.07 -264.98 II FAIL 12088.26 8862.20 10650.00 8861.64 45.09 150.10 171.84 270.10 2.875 339.01 631.41 -292.40 FAIL ~, 12080.15 8862.13 10675.00 8859.68 45.57 151.81 171.21 270.44 2.875 318.19 637.92 -319.74 FAIL 12071.88 8862.07 10700.00 8857.62 46.05 153.51 170.63 270.86 2.875 297.32 644.24 -346.92 FAIL ~~ 12063.05 8861.99 10725.00 8854.96 46.54 155.27 170.17 271.45 2.875 276.91 650.81 -373.90 FAIL 12053.83 8861.92 10750.00 8851.61 47.06 157.06 169.91 272.30 2.875 256.83 657.33 -400.49 FAIL 12044.42 8861.84 10775.00 8847.91 47.56 158.82 169.85 273.37 2.875 236.81 663.32 -426.51 FAIL ~ 12034.86 8861.76 10800.00 8843.94 48.07 160.55 170.05 274.71 2.875 216.85 668.84 -451.98 FAIL bP ~ BP Alaska Anticollision Re ort P 1NTEQ Company:. BP Amoco Date: 3/19/2008 Tirne: 17:04:04 Page: 2 Field: Prudhoe Bay Reference Site: PB DS 02 Co-ordinate(NE) Reference: WeIL 02-39, True North Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61 .5 ; Reference Wellpath: Plan5,D2-39A Db: Oracie ' Site: PB DS 0 2 Well: 02-09 Rule Assigned: Major Risk Wellpath: 02-096 V6 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset` TFO+AZI TFO-I3S' Casing/HSDistance Area Deviation` Warning ft ft ft ft ft ft deg deg in ft ft ft _-~ 12025.14 8861.67 10825.00 8839.61 48.58 162.27 170.58 276.43 2.875 197.02 673.48 -476.46 FAIL ~, ', 12015.22 8861.59 10850.00 8835.28 49.08 163.91 171.51 278.54 2.875 177.30 676.44 -499.13 FAIL ~I 112004.95 8861.50 10875.00 8831.23 49.59 165.55 172.80 281.06 2.875 157.81 677.75 -519.94 FAIL 1, 11994.01 8861.41 10900.00 8827.75 50.10 167.22 174.47 284.04 2.875 138.75 676.44 -537.69 FAIL ', 111982.37 8861.31 10925.00 8824.79 50.64 168.90 176.72 287.68 2.875 120.24 671.15 -550.92 FAIL 111969.95 8861.21 10950.00 8822.25 51.19 170.58 179.88 292.34 2.875 102.50 658.60 -556.11 FAIL II 111956.54 8861.09 10975.00 8820.05 51.76 172.27 184.45 298.52 2.875 85.96 633.38 -547.42 FAIL ~i 11938.57 8860.94 11000.00 8818.49 51.32 170.41 194.70 306.98 2.875 70.56 573.37 -502.81 FAIL ~I 11921.49 8860.79 11025.00 8817.67 50.76 168.07 209.37 319.60 2.875 56.63 466.69 -410.06 FAIL 11905.80 8860.66 11050.00 8817.51 50.20 165.73 230.64 338.98 2.875 46.22 276.08 -229.86 FAIL 11891.34 8860.53 11075.00 8817.93 49.62 163.42 258.69 5.30 2.875 42.78 130.83 -88.05 FAIL 11878.07 8860.40 11100.00 8818.75 49.07 161.18 285.82 30.84 2.875 48.52 370.33 -321.81 FAIL 11865.64 8860.28 11125.00 8819.34 48.51 158.96 304.80 48.33 2.875 61.59 506.79 -445.21 i FAIL I~ 11853.50 8860.15 11150.00 8819.57 47.96 156.69 316.72 58.80 2.875 78.33 564.63 -486.29 FAIL '~ 11841.88 8860.02 11175.00 8819.52 47.38 154.43 324.62 65.30 2.875 96.91 588.23 -491.33 FAIL ~!~ 11830.50 8859.88 11200.00 8819.25 46.81 152.12 330.23 69.54 2.875 116.27 596.57 -480.30 FAIL ', 111819.45 ( 8859.75 11225.00 8818.87 46.23 149.80 334.53 72.52 2.875 136.06 597.80 -461.74 FAIL '~ '111808.86 8859.61 11250.00 8818.84 45.65 147.51 338.14 74.86 2.875 156.11 595.79 -439.68 FAIL l I~ 11798.31 8859.48 11275.00 8818.92 45.06 145.15 341.23 76.68 2.875 176.06 591.40 -415.34 i FAIL 1 11787.95 8859.33 11300.00 8819.47 44.45 142.76 344.05 78.26 2.875 195.92 585.72 -389.81 FAIL 11778.00 8859.19 11325.00 8820.58 43.87 140.41 346.68 79.69 2.875 215.86 579.45 -363.58 FAIL ~ 11768.48 8859.06 11350.00 8821.48 43.28 138.11 348.97 80.84 2.875 236.10 572.52 -336.42 FAIL ', 11759.36 8858.92 11375.00 8822.00 42.71 135.85 350.95 81.73 2.875 256.61 565.21 -308.60 FAIL 1 11750.60 8858.79 11400.00 8822.14 42.16 133.64 352.68 82.41 2.875 277.34 557.73 -280.39 FAIL '.11742.18 8858.66 11425.00 8821.81 41.61 131.47 354.19 82.90 2.875 298.26 550.10 -251.84 FAIL 11734.04 8858.53 11450.00 8821.14 41.07 129.33 355.54 83.27 2.875 319.29 542.47 -223.17 FAIL :11726.04 8858.40 11475.00 8820.57 40.54 127.20 356.84 83.62 2.875 340.25 534.80 -194.55 FAIL ~I 11718.19 8858.27 11500.00 8820.13 40.00 125.07 358.10 83.94 2.875 361.14 527.08 -165.93 FAIL ...11710.48 8858.14 11525.00 8819.80 39.47 122.95 359.33 84.24 2.875 381.98 519.35 -137.37 FAIL 1 11688.05 8857.76 11550.00 8819.36 40.29 125.73 358.41 84.53 2.875 402.65 530.22 -127.57 FAIL 11565.85 8855.92 11575.00 8818.91 49.00 154.86 344.18 84.95 2.875 420.71 643.13 -222.42 FAIL 11496.96 8855.10 11600.00 8818.90 52.34 164.74 337.93 85.22 2.875 433.96 682.64 -248.68 FAIL 1 I ', 11485.86 8854.97 11625.00 8819.04 51.87 162.91 339.43 85.39 2.875 446.95 675.95 -229.00 FAIL ~1 11475.00 8854.85 11650.00 8818.70 51.41 161.05 340.84 85.50 460.46 669.10 -208.63 FAIL ~ ', 11464.62 8854.73 11675.00 8817.70 50.92 159.18 342.12 85.52 474.59 662.11 -187.52 FAIL 1 11461.16 8854.69 11683.50 8817.21 50.75 158.55 342.53 85.52 479.53 659.71 -180.18 FAIL - - I! Site: __ ...-- --- PB DS 02 ---- __ ___ _ _ ----- -- Well: 02-29A Rule Assigned: Major Risk Wellpath: 02-29C V3 Inter-Site Error: 0.00 ft Reference Offset , Semi-Major Axis Ctr-Ctr No-Go Allowable 1 MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ~, ft ft ft ° ft ft ft deg deg. in ft ft ft 11582.43 8856.14 10725.00 8863.86 47.92 24.45 170.85 269.64 2.375 1225.50 259.61 965.89 Pass ~ 11583.65 8856.16 10750.00 8861.58 47.84 24.44 171.10 269.74 2.375 1200.98 259.33 941.64 I Pass 11585.03 8856.18 10775.00 8860.01 47.75 24.44 171.34 269.81 2.375 1176.50 259.02 917.48 Pass 11586.33 8856.20 10800.00 8859.11 47.66 24.44 171.54 269.86 2.375 1151.92 258.73 893.18 Pass I, 11587.32 8856.21 10825.00 8858.42 47.59 24.44 171.69 269.89 2.375 1127.16 258.52 868.63 Pass ~ 11587.92 8856.22 10850.00 8857.71 47.55 24.44 171.79 269.92 2.375 1102.25 258.41 843.85 Pass 11587.99 8856.22 10875.00 8856.37 47.55 24.44 171.87 269.99 2.375 1077.30 258.41 818.89 Pass 11587.14 8856.21 10900.00 8855.11 47.61 24.44 171.84 270.06 2.375 1052.51 258.62 793.88 Pass ~i 11585.34 8856.18 10925.00 8854.70 47.73 24.44 171.64 270.08 2.375 1028.18 _ 259.07 769.12 Pass _ _ by ~ BP Alaska Anticollision Report iNTEQ .Company: BP Amoco - Date: 3/19/2008. Time. 17:04:04 Page: 3 Field: Prudhoe Bay Reference. Site: PB DS 02 ( > Go-ordinate NE Reference: Well: 02-39, True North Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61 .5 ~ 'Reference Wellpath: Plan 5; 02-39A Db: I~ Oracle Site: PB DS 02 Well: 02-29A Rule Assigned: Major Risk Wellpath: 02-29C V3 Inter-Site Error: 0.00 ft Reference Offset SemrMajor Axis -- - - --- Ctr-Ctr No-Go Allowable MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing/FISDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 11584.13 8856.17 10950.00 8854.38 47.81 24.44 171.52 270.10 2.375 1003.48 259.38 744.10 Pass I 11583.27 8856.16 10975.00 8853.37 47.87 24.45 171.48 270.16 2.375 978.64 259.61 719.04 Pass i i 11582.56 8856.15 11000.00 8851.92 47.91 24.45 171.48 270.25 2.375 953.78 259.79 693.99 Pass 'i 11582.15 8856.14 11025.00 8850.52 47.94 24.45 171.53 270.35 2.375 928.87 259.90 668.96 Pass i 11582.41 8856.14 11050.00 8849.57 47.92 24.45 171.63 270.42 2.375 903.91 259.86 644.05 Pass i 11582.62 8856.15 11075.00 8848.29 47.91 24.45 171.75 270.51 2.375 878.96 259.82 619.13 Pass ' 11583.06 8856.15 11100.00 8847.49 47.88 24.45 171.87 270.58 2.375 854.02 259.74 594.28 Pass 11583.32 8856.16 11125.00 8847.18 47.86 24.45 171.94 270.62 2.375 829.05 259.70 569.35 Pass ' 11582.77 8856.15 11150.00 8846.91 47.90 24.45 171.91 270.66 2.375 804.10 259.86 544.25 Pass 11581.84 8856.14 11175.00 8847.07 47.96 24.45 171.81 270.67 2.375 779.22 260.10 519.12 Pass 11580.53 8856.12 11200.00 8847.49 48.05 24.45 171.64 270.66 2.375 754.46 260.45 494.01 Pass ', 11578.70 8856.09 11225.00 8847.50 48.17 24.46 171.44 270.67 2.375 729.90 260.91 468.99 Pass 'I '~ 11575.00 8856.04 11250.00 8847.19 48.42 24.47 171.04 270.72 2.375 705.67 261.77 443.90 Pass 11575.00 8856.04 11275.00 8846.73 48.42 24.48 171.10 270.78 2.375 681.88 261.79 420.09 Pass i 11569.08 8855.96 11300.00 8846.47 48.79 24.50 170.44 270.83 2.375 658.90 263.09 395.80 Pass t ', 11563.95 8855.90 11325.00 8847.01 49.12 24.53 169.79 270.80 2.375 637.03 264.31 372.72 Pass 11557.97 8855.82 11350.00 8848.53 49.50 24.57 168.96 270.68 2.375 616.24 265.74 350.50 Pass ~ ~I 11550.00 8855.72 11375.00 8850.89 50.00 24.63 167.79 270.47 2.375 596.25 267.60 328.65 Pass ', 11544.18 8855.64 11400.00 8853.70 50.35 24.69 166.82 270.19 2.375 577.44 268.91 308.53 Pass 11541.28 8855.61 11409.50 8854.81 50.52 24.72 166.36 270.08 2.375 570.50 269.59 300.91 Pass Site: PB DS 02 Well: 02-29A Rule Assigned: Major Risk Wellpath: 02-29CP61 V1 - Inter-Site Error: - 0.00 ft -- -. Reference Offset Semi-Major Axis Ctr-Ctr No-Go :Allowable ~ MD `- TVI) MD - TVD Ref ' Offset TFO+AZI TFO-HS' Casing/FISDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ~ 11587.18 8856.21 10650.00 8884.19 47.60 24.42 170.54 268.75 1285.73 258.78 1026.96 Pass ' 11586.40 8856.20 10675.00 8884.45 47.66 24.42 170.41 268.72 1260.91 258.99 1001.92 Pass I ~ 11585.53 8856.19 10700.00 8885.19 47.71 24.42 170.24 268.66 1236.15 259.22 976.93 Pass 11584.41 8856.17 10725.00 8886.70 47.79 24.42 170.01 268.56 1211.57 259.52 952.05 Pass 11582.91 i 8856.15 10750.00 8888.70 47.89 24.43 169.70 268.43 1187.29 259.90 927.39 Pass i II 11581.46 8856.13 10775.00 8890.76 47.99 24.43 169.39 268.29 1162.96 260.26 902.69 Pass ~~ ~~ 11575.00 8856.04 10800.00 8891.96 48.42 24.44 168.53 268.20 1138.44 261.63 876.82 Pass 11575.00 8856.04 10825.00 8892.18 48.42 24.44 168.47 268.15 1113.69 261.69 852.00 Pass i, ', 11575.00 8856.04 10850.00 8891.75 48.42 24.44 168.45 268.13 1088.86 261.75 827.11 Pass 11575.00 8856.04 10870.50 8891.38 48.42 24.44 168.43 268.11 1068.50 261.80 806.70 Pass Site: PB DS 02 Well: 02-37 Rule Assigned: Major Risk Wellpath: 02-37L1 V3 Inter-Site Error: 0.00 ft Refe rence Offs et Semi-M ajor Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZ I TFO-H S Gasing/ HSDistance Area Deviation Warning '~ ft ft ft ft ft ft deg deg in ft ft ft 12400.00 8868.32 10300.00 8840.93 51.48 40.39 323.73 88.16 2.875 848.11 308.66 539.45 Pass 12389.76 12380.84 8867.98 8867.68 10325.00 10350.00 8840.29 8839.73 51.36 51.25 40.15 39.96 324.94 326.00 88.14 88.12 2.875 2.875 851.40 854.26 307.58 306.69 543.82 547.57 Pass Pass 12375.00 8867.49 10375.00 8839.37 51.18 39.91 326.72 88.14 2.875 858.68 306.34 552.34 Pass 12363.39 8867.12 10400.00 8838.18 50.98 39.54 328.05 88.08 2.875 864.68 304.62 560.06 Pass 12355.00 8866.87 10425.00 8836.57 50.84 39.32 328.99 88.01 2.875 872.73 303.52 569.21 Pass 12350.00 8866.71 10450.00 8835.12 50.75 39.27 329.54 87.97 2.875 883.13 303.12 580.01 Pass II 12339.45 8866.40 10475.00 8833.98 50.52 38.88 330.77 87.92 2.875 895.70 301.26 594.44 Pass I 12332.32 8866.20 10500.00 8832.91 50.36 38.67 331.60 87.90 2.875 909.87 300.16 609.71 Pass by ~ BP Alaska Anticollision Re ort P 11vTEQ Company:... BP Arnoco Date: 3/19/2008 Time: 17:04:04 Page: 4 Field: Pntdhoe Bay i Reference Site: PB DS 02 Co-ordinate(NE) Reference: Well: 02-39, True North ~ Reference Well: 02-39 Vertical (1'VD) Reference: 02-39 61.5 i Reference Wellpath: Plan 5, 02-39A Db: OraCle Site: PB DS 02 Well: 02-37 Rule Assigned: Major Risk Wellpath: 02-37L1 V3 Inter-Site Error: 0.00 ft -._. ~ Reference Offset: , SemrMajor Axis Ctr-Ctr No-Go 'Allowable MD TVD MD TVD Ref ` .Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning. ft ft ft ft ft ft deg deg in ft ft ft 12325.00 8866.00 10525.00 8832.41 50.20 38.43 332.49 87.92 2.875 925.56 298.94 626.62 Pass 12319.53 8865.85 10550.00 8832.62 50.05 38.27 333.21 87.98 2.875 942.68 298.05 644.64 Pass 12313.87 8865.69 10575.00 8833.03 49.90 38.09 333.96 88.05 2.875 961.00 297.04 663.96 Pass II 12308.78 8865.56 10600.00 8833.29 49.76 37.93 334.63 88.11 2.875 980.63 296.14 684.49 Pass 12300.00 8865.34 10625.00 8833.23 49.53 37.49 335.72 88.14 2.875 1001.42 294.10 707.32 Pass li 12300.00 8865.34 10650.00 8832.81 49.53 37.62 335.75 88.18 2.875 1023.14 294.50 728.64 Pass 'i '~ 12300.00 8865.34 10675.00 8831.87 49.53 37.74 335.75 88.18 2.875 1045.82 294.85 750.97 Pass ~' 12294.15 8865.19 10700.00 8830.27 49.34 37.43 336.40 88.13 2.875 1069.06 293.38 775.69 Pass 12291.91 8865.14 10725.00 8828.81 49.27 37.35 336.64 88.09 2.875 1092.95 292.91 800.04 Pass 12290.38 8865.10 10750.00 8828.09 49.22 37.30 336.83 88.10 2.875 1117.42 292.61 824.81 Pass 12289.37 8865.07 10775.00 8827.01 49.19 37.26 336.94 88.09 2.875 1142.18 292.42 849.77 Pass 12288.87 8865.06 10800.00 8825.44 49.17 37.24 336.96 88.05 2.875 1167.11 292.31 874.80 Pass ~, 12288.91 8865.06 10825.00 8823.61 49.17 37.24 336.91 88.01 2.875 1192.09 292.32 899.77 Pass 12289.46 8865.08 10850.00 8821.83 49.19 37.27 336.80 87.96 2.875 1216.99 292.43 924.56 Pass ~~ ', 12290.46 8865.10 10875.00 8820.44 49.22 37.30 336.65 87.94 2.875 1241.72 292.64 949.08 Pass I, 12291.91 8865.14 10900.00 8819.30 49.27 37.35 336.47 87.92 2.875 1266.15 292.93 973.22 Pass 12300.00 8865.34 10925.00 8818.04 49.53 37.88 335.50 87.92 2.875 1290.17 295.28 994.89 Pass 12300.00 8865.34 10950.00 8817.00 49.53 37.79 335.48 87.91 2.875 1313.61 295.01 1018.59 Pass 12300.00 8865.34 10975.00 8816.23 49.53 37.69 335.47 87.90 2.875 1336.54 294.70 1041.84 Pass 12300.00 8865.34 11000.00 8815.51 49.53 37.57 335.46 87.89 2.875 1358.90 294.34 1064.56 Pass 12300.00 8865.34 11025.00 8814.72 49.53 37.43 335.45 87.88 2.875 1380.50 293.92 1086.58 Pass ', 12308.54 8865.55 11050.00 8813.83 49.76 37.93 334.43 87.88 2.875 1401.13 296.11 1105.01 Pass 12311.63 8865.64 11071.40 8813.06 49.84 38.03 334.05 87.88 2.875 1418.70 296.67 1122.03 Pass Site: PB DS 02 Well: 02-38 Rule Assigned: Major Risk Wellpath: 02-38 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft' ft ft ft ft deg deg in ft ft ft, 12389.83 8867.98 8350.00 7503.49 51.36 39.98 220.40 343.60 1423.13 124.08 1299.05 Pass 12354.28 8866.84 8375.00 7525.79 50.82 39.23 224.42 343.35 1400.36 123.10 1277.26 Pass 12320.55 8865.87 8400.00 7548.11 50.08 38.34 228.26 343.15 1377.40 121.77 1255.64 Pass 12288.85 8865.06 8425.00 7570.44 49.17 37.35 231.90 342.99 1354.26 120.20 1234.06 Pass 12259.28 8864.39 8450.00 7592.79 48.16 36.28 235.32 342.87 1330.95 118.45 1212.50 Pass '~ 12231.80 8863.85 8475.00 7615.13 47.08 35.19 238.54 342.79 1307.50 116.56 1190.93 Pass 12206.39 8863.42 8500.00 7637.45 45.96 34.09 241.54 342.74 1283.92 114.60 1169.32 Pass ~ 12182.99 8863.08 8525.00 7659.76 44.83 33.00 244.33 342.73 1260.22 112.61 1147.62 Pass ii 12161.52 8862.83 8550.00 7682.05 43.72 31.95 246.93 342.75 1236.43 110.62 1125.81 Pass 12141.74 8862.63 8575.00 7704.37 42.64 30.93 249.34 342.79 1212.56 108.70 1103.86 Pass i 12132.39 8862.56 8600.00 7726.73 42.42 30.79 249.90 342.86 1188.64 108.26 1080.38 Pass 12128.23 8862.52 8625.00 7749.11 42.68 31.12 249.47 342.94 1164.72 108.65 1056.07 Pass ~, 12124.01 8862.49 8650.00 7771.51 42.94 31.45 249.04 343.01 1140.81 109.03 1031.78 Pass 12119.77 8862.46 8675.00 7793.91 43.20 31.79 248.61 343.09 1116.89 109.40 1007.49 Pass 12115.51 8862.42 8700.00 7816.30 43.46 32.12 248.18 343.17 1092.97 109.75 983.21 Pass i 12111.24 8862.39 8725.00 7838.68 43.72 32.46 247.76 343.26 1069.04 110.09 958.95 Pass !, 12106.95 8862.35 8750.00 7861.10 43.98 32.79 247.34 343.35 1045.09 110.41 934.68 Pass '~, 12102.64 8862.32 8775.00 7883.56 44.24 33.12 246.91 343.44 1021.12 110.73 910.39 Pass ~' 12098.32 8862.28 8800.00 7906.09 44.50 33.45 246.48 343.53 997.14 111.02 886.12 Pass 12093.98 8862.25 8825.00 7928.66 44.76 33.78 246.04 343.62 973.14 111.34 861.79 Pass i ', 12089.51 8862.21 8850.00 7951.21 45.02 34.12 245.59 343.70 949.17 111.66 837.50 Pass I/.L~ by BP Alaska ~ ~ Anticollision Re ort p 1NTEQ Company: BP Amoco Date: 3/19/2008 Time: 17:Q4:04 Page: S Field: Prudhoe Bay ii Reference Site: PB DS 02 Co-ordinate(NE) Reference: Well: 02-39, True North Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61.5 Reference Welipath Plan 5,_02-39A _ _ _ Db: Oracle Site: PB DS 02 Well: 02-38 Rule Ass igned: Major Risk Wellpath: 02-38 V1 Inter-Site Error: 0.00 ft --- Reference ----- Offset -- Semi-Major Axis Ctr-Ctr No-Go Allowable. - MD TVD MD TVD lief Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12084.89 8862.17 8875.00 7973.73 45.29 34.47 245.13 343 79 925.25 111.99 813.26 Pass 12080.09 8862.13 8900.00 7996.20 45.57 34.82 244.64 343.88 901.39 112.32 789.07 Pass 12075.13 8862.09 8925.00 8018.61 45.86 35.19 244.13 343.98 877.59 112.66 764.93 Pass 12070.01 8862.05 8950.00 8040.90 46.15 35.56 243.65 344.10 853.85 112.88 740.97 Pass 12064.74 8862.01 8975.00 8063.05 46.44 35.94 243.16 344.24 830.18 113.06 717.12 Pass 12059.29 8861.96 9000.00 8085.06 46.75 36.33 242.68 344.41 806.59 113.17 693.42 Pass ~I 12053.67 8861.91 9025.00 8106.93 47.06 36.73 242.20 344.61 783.09 113.21 669.88 Pass 12047.86 8861.87 9050.00 8128.75 47.38 37.14 241.71 344.82 759.66 113.17 646.49 Pass ' 12041.86 8861.82 9075.00 8150.52 47.70 37.55 241.21 345.04 736.29 113.12 623.17 , Pass ~I 12035.66 8861.76 9100.00 8172.25 48.03 37.97 240.69 345.27 712.98 113.03 599.95 Pass ~i 12029.24 8861.71 9125.00 8193.93 48.37 38.41 240.17 345.51 689.75 112.92 576.83 Pass 12022.60 8861.65 9150.00 8215.59 48.71 38.85 239.61 345.75 666.59 112.75 553.84 Pass 12015.71 8861.60 9175.00 8237.22 49.05 39.30 239.04 346.00 643.51 112.59 530.92 Pass 12008.58 8861.53 9200.00 8258.82 49.41 39.75 238.44 346.26 620.50 112.40 508.09 Pass 12001.19 8861.47 9225.00 8280.37 49.77 40.22 237.82 346.52 597.58 112.21 485.37 Pass 11993.49 8861.41 9250.00 8301.86 50.13 40.69 237.16 346.79 574.76 111.94 462.83 Pass 11985.51 8861.34 9275.00 8323.29 50.50 41.18 236.48 347.07 552.06 111.66 440.39 Pass 11977.21 8861.27 9300.00 8344.67 50.88 41.66 235.77 347.36 529.46 111.37 418.09 Pass '! 11968.59 8861.19 9325.00 8366.00 51.25 42.16 235.02 347.64 506.97 111.06 395.91 Pass ', 11959.66 8861.12 9350.00 8387.31 51.62 42.66 234.21 347.90 484.58 110.80 373.78 i Pass ~I 11948.11 8861.02 9375.00 8408.59 51.62 42.72 234.73 348.15 462.29 109.92 352.37 Pass 11934.40 8860.90 9400.00 8429.85 51.19 42.28 236.66 348.44 440.00 108.27 331.73 Pass 11921.19 8860.79 9425.00 8451.10 50.75 41.84 238.61 348.80 417.66 106.39 311.26 Pass 11908.50 8860.68 9450.00 8472.35 50.30 41.39 240.59 349.26 395.28 104.32 290.95 Pass 11896.15 8860.57 9475.00 8493.59 49.82 40.92 242.63 349.82 372.87 101.96 270.90 Pass ~I 11884.24 8860.46 9500.00 8514.83 49.33 40.45 244.74 350.50 350.45 99.42 251.04 Pass 11872.78 8860.35 9525.00 8536.06 48.84 39.98 246.93 351.32 328.07 96.74 231.33 Pass 11861.76 8860.24 9550.00 8557.27 48.34 39.51 249.23 352.30 305.74 94.02 211.73 Pass ', 11851.16 8860.12 9575.00 8578.47 47.85 39.04 251.69 353.48 283.51 91.39 192.12 Pass 11840.97 8860.01 9600.00 8599.65 47.34 38.57 254.34 354.90 261.41 89.07 172.34 Pass 11831.22 8859.89 9625.00 8620.52 46.85 38.12 257.41 356.81 239.76 87.43 152.33 Pass 11822.06 8859.78 9650.00 8640.67 46.37 37.68 261.23 -0.47 219.14 87.69 131.45 Pass 11813.67 8859.68 9675.00 8659.72 45.91 37.27 266.10 3.39 200.32 93.05 107.28 Pass 11806.17 8859.58 9700.00 8677.61 45.50 36.90 272.14 8.54 184.02 105.38 78.64 Pass 11799.51 8859.49 9725.00 8694.08 45.13 36.56 279.50 15.09 171.34 125.21 46.13 Pass II i 11793.51 8859.41 9750.00 8709.48 44.78 36.26 287.93 22.80 162.66 150.31 12.34 Pass 11787.94 8859.33 9775.00 8724.38 44.45 35.97 297.07 31.27 157.91 177.22 -19.31 FAIL ~ 11782.65 8859.26 9800.00 8739.13 44.14 35.70 306.50 40.07 157.01 202.68 -45.67 FAIL 11778.05 8859.20 9825.00 8753.29 43.87 35.46 315.74 48.76 160.67 224.36 -63.69 FAIL 11774.01 8859.14 9850.00 8766.79 43.63 35.25 324.27 56.80 168.68 240.73 -72.05 FAIL 11770.47 8859.09 9875.00 8779.95 43.41 35.07 331.83 63.94 180.15 251.89 -71.74 FAIL 1 11767.64 8859.04 9900.00 8792.85 43.23 34.92 338.33 70.10 194.48 258.90 -64.42 FAIL 11765.74 8859.02 9925.00 8805.00 43.11 34.83 343.66 75.20 211.53 262.93 -51.40 FAIL ', 11764.44 8859.00 9950.00 8815.68 43.03 34.77 347.81 79.20 231.11 264.91 -33.80 FAIL ' ', 11764.10 8858.99 9975.00 8824.71 43.01 34.77 350.86 82.20 252.65 265.92 -13.27 I FAIL 11764.60 8859.00 10000.00 8832.18 43.04 34.81 353.01 84.41 275.46 266.53 8.93 Pass 11765.98 8859.02 10025.00 8838.46 43.12 34.89 354.49 86.06 298.96 267.13 31.83 Pass ~! 11768.36 8859.06 10050.00 8843.89 43.27 35.04 355.45 87.31 322.70 267.96 54.75 Pass 11771.46 8859.10 10075.00 8847.95 43.47 35.23 355.93 88.16 346.64 269.01 77.63 Pass 11774.19 8859.14 10100.00 8851.10 43.64 35.39 356.20 88.76 370.89 269.90 100.98 Pass 11776.50 8859.17 10125.00 8853.86 43.78 35.52 356.40 89.23 395.34 270.64 124.70 Pass bP , BP Alaska Anticollision Report s 1NTEQ li Company: A BP AMOCO Date: 3/19/2008 `l'ime: 17:04.04 Page: `6 'Field: Prudhoe Bay Reference Site: PB DS 02 Co-ordinate(NE) Reference: Well: 02- 39, True North ~ Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61 .5 Reference Wellpath: Plan 5, 02-39A Db: OraGe - Site: PB DS 0 2 Well: 02-38 Rule Assigned: Major Risk Wellpath: 02-38 V1 Inter-Site Error: 0.00 ft ' Reference Offset Semi-Major Axiis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft < ft ft ft deg deg in ft ft ft 11778 58 8859.20 10150.00 8856.51 43.90 35.64 356.55 89.63 419.88 271.28 148.60 Pass 11780.38 8859.23 10175.00 8859.08 44.01 35.75 356.68 89.98 444.50 271.85 172.65 Pass 11780.87 8859.24 10200.00 8861.20 44.03 35.78 356.88 90.24 469.38 271.93 197.45 Pass 11781.29 8859.24 10225.00 8862.90 44.06 35.80 357.02 90.42 494.30 272.01 222.29 Pass 11783.00 ~ 8859.27 10250.00 8864.17 44.16 35.91 356.93 90.54 519.02 272.59 246.43 Pass ~i 11784.72 8859.29 10275.00 8864.62 44.26 36.00 356.74 90.56 543.76 273.18 270.58 Pass 11786.37 ~ 8859.31 10300.00 8864.28 44.36 36.09 356.48 90.50 568.49 273.77 294.73 Pass ! 11787.95 8859.33 10325.00 8863.24 44.45 36.18 356.17 90.38 593.21 274.34 318.87 Pass ~' 11789.42 8859.35 10350.00 8861.71 44.54 36.26 355.84 90.22 617.93 274.89 343.04 Pass 11790.76 8859.37 10375.00 8860.10 44.62 36.33 355.52 90.06 642.68 275.38 367.30 Pass '..11792.11 8859.39 10400.00 8858.42 44.70 36.41 355.21 89.92 667.41 275.88 391.53 Pass 11793.45 8859.41 10425.00 8856.72 44.78 36.48 354.91 89.78 692.14 276.37 415.77 Pass 11794.72 8859.43 10450.00 8855.11 44.85 36.55 354.64 89.65 716.90 276.83 440.07 Pass 11795.89 8859.44 10475.00 8853.69 44.92 36.61 354.40 89.56 741.69 277.25 464.43 Pass 11800.00 8859.50 10500.00 8852.42 45.16 36.92 353.83 89.48 766.54 278.92 487.62 Pass ~~ 11800.00 8859.50 10525.00 8851.08 45.16 36.89 353.74 89.40 791.34 278.85 512.48 Pass ', 11800.00 8859.50 10550.00 8849.27 45.16 36.85 353.63 89.28 816.06 278.77 537.29 Pass 11800.00 8859.50 10575.00 8846.86 45.16 36.81 353.48 89.14 840.68 278.67 562.02 Pass 11800.00 8859.50 10600.00 8844.19 45.16 36.77 353.33 88.98 865.25 278.56 586.68 Pass 11800.00 8859.50 10625.00 8841.98 45.16 36.73 353.21 88.86 889.90 278.45 611.45 Pass 11800.00 8859.50 10650.00 8840.63 45.16 36.69 353.15 88.81 914.65 278.35 636.30 Pass ~I 11805.89 8859.58 10675.00 8840.01 45.48 37.14 352.45 88.81 939.34 280.70 658.64 Pass i 11807.11 8859.59 10700.00 8839.78 45.55 37.21 352.32 88.82 964.07 281.11 682.97 Pass 11808.04 8859.60 10725.00 8839.57 45.60 37.26 352.22 88.84 988.91 281.40 707.51 Pass I~ 11808.90 8859.62 10750.00 8839.45 45.65 37.31 352.14 88.86 1013.76 281.68 732.08 Pass ~~ 11809.69 8859.63 10775.00 8839.38 45.69 37.35 352.07 88.88 1038.64 281.94 756.70 Pass 11810.40 8859.63 10800.00 8839.32 45.73 37.39 352.01 88.91 1063.53 282.16 781.37 Pass 11811.03 8859.64 10825.00 8839.13 45.77 37.43 351.94 88.92 1088.45 282.36 806.08 Pass '~ 11811.55 8859.65 10850.00 8838.63 45.79 37.46 351.88 88.92 1113.39 282.53 830.86 Pass I ~, 11812.08 8859.66 10875.00 8838.20 45.82 37.49 351.82 88.92 1138.32 282.70 855.62 Pass 11812.67 8859.66 10900.00 8837.86 45.86 37.52 351.75 88.93 1163.24 282.89 880.35 Pass 11813.26 8859.67 10925.00 8837.59 45.89 37.55 351.69 88.94 1188.16 283.08 905.07 Pass ~, 11813.80 8859.68 10950.00 8837.30 45.92 37.58 351.63 88.94 1213.09 283.26 929.83 Pass 11814.25 8859.68 10975.00 8836.79 45.94 37.61 351.58 88.94 1238.03 283.40 954.63 Pass 11814.67 8859.69 11000.00 8836.25 45.96 37.63 351.52 88.94 1262.99 283.54 979.45 Pass 11815.16 8859.70 11025.00 8835.86 45.99 37.66 351.47 88.94 1287.92 283.70 1004.23 Pass 11815.68 8859.70 11050.00 8835.55 46.02 37.69 351.41 88.95 1312.85 283.87 1028.98 Pass ', 11816.08 8859.71 11075.00 8835.11 46.04 37.71 351.37 88.95 1337.80 283.99 1053.81 Pass 11816.45 8859.71 11100.00 8834.58 46.06 37.73 351.32 88.94 1362.76 284.11 1078.65 Pass 11816.76 8859.72 11125.00 8833.61 46.08 37.75 351.26 88.92 1387.73 284.21 1103.51 Pass 11817.03 8859.72 11150.00 8832.50 46:09 37.76 351.20 88.90 1412.69 284.30 1128.39 Pass Site: PB DS 02 Well: 02-38L1 Rule Assigned: Major Risk Wellpath: 02-38L1 V1 Inter-Site Error: 0.00 - ft - - Reference Offset - Semi-Major Axis - - Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ~~ 12388.08 8867.92 8350.00 7503.37 51.34 39.95 220.61 343.60 1423.19 123.99 1299.19 Pass 12352.62 8866.79 8375.00 7525.67 50.79 39.19 224.62 343.36 1400.41 123.00 1277.41 Pass ', 12318.99 8865.83 8400.00 7547.99 50.04 38.30 228.45 343.15 1377.44 121.64 1255.80 Pass 'i 12287.40 8865.03 8425.00 7570.32 49.13 37.30 232.08 342.99 1354.29 120.07 1234.22 Pass bP ~ BP Alaska ~ ~ Anticollision Report 1NTEQ - - - ~ !Company:,;.. BP Amoco Date: 3/19/2008 Time: 17:04:04 Page: 7 Field: Prudhoe Bay Reference Site: PB DS 02 Co-ordinate(NE) Reference: ' We11: 02-39, True North ~ Reference Well: `-02-39 Vertical (TVD) Reference: 02-39 61.5 'Reference Wellpath: Plan 5,:02-39A Db: Oracle -------------------------- - -- Site: PB DS 02 Well: 02-38L1 Rule Assigned: Major Risk Wellpath: 02-38L1 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable ~~ MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area. Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12257.94 8864.36 8450.00 7592.67 48.11 36.23 235.49 342.88 1330.97 118.31 1212.66 Pass 12230.56 8863.83 8475.00 7615.01 47.03 35.14 238.69 342.80 1307.51 116.43 1191.09 Pass 12205.25 8863.40 8500.00 7637.33 45.91 34.03 241.69 342.76 1283.93 114.46 1169.46 Pass I, 12181..96 8863.07 8525.00 7659.64 44.78 32.95 244.47 342.75 1260.23 112.47 1147.76 Pass 12160.57 8862.82 8550.00 7681.93 43.67 31.90 247.06 342.77 1236.44 110.49 1125.95 Pass 12140.87 8862.63 8575.00 7704.26 42.59 30.89 249.46 342.81 1212.56 108.57 1103.99 Pass 12132.20 8862.55 8600.00 7726.61 42.43 30.80 249.90 342.88 1188.63 108.23 1080.41 Pass 12128.04 8862.52 8625.00 7748.99 42.69 31.13 249.47 342.96 1164.72 108.62 1056.10 Pass 12123.81 8862.49 8650.00 7771.40 42.96 31.47 249.04 343.03 1140.81 109.00 1031.81 Pass 12119.57 8862.45 8675.00 7793.79 43.21 31.80 248.61 343.11 1116.89 109.37 1007.52 Pass 12115.32 8862.42 8700.00 7816.19 43.47 32.14 248.18 343.19 1092.97 109.72 983.25 Pass 12111.04 8862.39 8725.00 7838.57 43.73 32.47 247.76 343.28 1069.04 110.05 958.99 Pass 12106.75 8862.35 8750.00 7860.98 43 99 32 80 247 33 343 37 1045 09 110.37 934.72 Pass 12102.44 8862.32 8775.00 7883.45 . 44.26 . 33.13 . 246.91 . 343.46 . 1021.12 110.69 910.43 Pass 12098.12 8862.28 8800.00 7905.98 44.52 33.46 246.48 343.55 997.14 110.98 886.16 Pass 12093.78 8862.25 8825.00 7928.55 44.77 33.80 246.04 343.64 973.13 111.30 861.84 Pass 12089.31 8862.21 8850.00 7951.11 45.03 34.14 245.59 343.72 949.17 111.62 837.55 Pass 12084.67 8862.17 8875.00 7973.62 45.30 34.48 245.13 343.81 925.26 111.95 813.31 Pass 12079.87 8862.13 8900.00 7996.08 45.59 34.84 244.64 343.91 901.40 112.28 789.12 Pass 12074.90 8862.09 8925.00 8018.49 45.88 35.20 244.14 344.01 877.60 112.57 765.03 Pass 12069.78 8862.05 8950.00 8040.78 46.16 35.58 243.65 344.13 853.86 112.82 741.04 Pass 12064.49 8862.00 8975.00 8062.92 46.46 35.96 243.16 344.27 830.20 113.00 717.20 Pass ~ 12059.04 8861.96 9000.00 8084.92 46.76 36.35 242.68 344.44 806.62 113.11 693.51 Pass 12053.41 8861.91 9025.00 8106.80 47.08 36.75 242.20 344.64 783.12 113.14 669.98 Pass 12047.59 8861.86 9050.00 8128.61 47.40 37.16 241.71 344.85 759.69 113.10 646.59 Pass 12041.58 8861.81 9075.00 8150.38 47.71 37.57 241.21 345.07 736.32 113.04 623.28 Pass i 12035.37 8861.76 9100.00 8172.10 48.04 37.99 240.69 345.30 713.03 112.95 600.07 Pass ' ~ 12028.95 8861.71 9125.00 8193.79 48.38 38.43 240.16 345.54 689.80 112.83 576.96 Pass 12022.29 8861.65 9150.00 8215.44 48.73 38.87 239.61 345.79 666.64 112.67 553.97 Pass 12015.40 8861.59 9175.00 8237.07 49.07 39.32 239.04 346.04 643.56 112.50 531.06 Pass 12008.26 8861.53 9200.00 8258.66 49.42 39.77 238.44 346.30 620.56 112.31 508.24 Pass 12000.84 8861.47 9225.00 8280.22 49.79 40.24 237.81 346.56 597.64 112.11 485.53 Pass ~ 11993.14 8861.40 9250.00 8301.71 50.14 40.72 237.16 346.83 574.83 111.84 463.00 Pass ', 11985.14 8861.34 9275.00 8323.14 50.51 41.20 236.48 347.11 552.13 111.56 440.57 Pass 11976.83 8861.26 9300.00 8344.51 50.89 41.69 235.76 347.40 529.54 111.27 418.27 Pass 11968.20 8861.19 9325.00 8365.84 51.26 42.19 235.01 347.67 507.06 110.96 396.10 Pass 11959.25 8861.12 9350.00 8387.15 51.64 42.69 234.20 347.94 484.67 110.70 373.98 Pass 11947.48 8861.01 9375.00 8408.43 51.60 42.70 234.84 348.19 462.39 109.75 352.64 Pass 11933.79 8860.90 9400.00 8429.69 51.17 42.26 236.77 348.48 440.09 108.09 332.00 Pass 11920.61 8860.78 9425.00 8450.94 50.73 41.82 238.72 348.85 417.75 106.21 311.54 Pass 11907.94 8860.68 9450.00 8472.18 50.28 41.37 240.70 349.31 395.37 104.13 291.24 Pass ' 11895.60 8860.57 9475.00 8493.43 49.80 40.90 242.75 349.87 372.96 101.77 271.20 Pass 11883.71 8860.46 9500.00 8514.67 49.31 40.43 244.87 350.56 350.55 99.22 251.34 Pass 11872.27 8860.35 9525.00 8535.89 48.82 39.96 247.06 351.38 328.17 96.54 231.63 Pass 11861.27 ~ 8860.23 9550.00 8557.10 48.31 39.49 249.37 352.37 305.85 93.84 212.02 Pass I 11850.69 I 8860.12 9575.00 8578.30 47.83 39.02 251.82 353.56 283.62 91.24 192.39 Pass ~'~ 11840.52 8860.00 9600.00 8599.48 47.32 38.55 254.48 355.00 261.54 88.95 172.58 Pass 11830.79 8859.89 9625.00 8620.33 46.82 38.09 257.58 356.92 239.92 87.38 152.55 Pass 'i 11821.65 8859.78 9650.00 8640.43 46.35 37.66 261.43 -0.32 219.37 87.81 131.56 Pass ' 11813.30 8859.67 9675.00 8659.43 45.89 37.25 266.32 3.57 200.65 93.39 107.25 Pass 11805.85 8859.58 9700.00 8677.27 45.48 36.88 272.39 8.74 184.46 105.95 78.51 Pass by i BP Alaska ~ ~~ Anticollision Re ort P INTEQ ~ Company: BP Amoco Field: Pnidhoe Bay ~ Reference Site: PB DS 02 ~, Reference Well: 02-39 Reference Wellpath: Plan 5, 02-39A Site: PB DS 02 Well: 02-38L1 Wellpath: 02-38L1 V1 1eference Offset Semi-Ma MD TVD MD TVD Ref ft ft ft ft ft Date:. 3/19!2008 Co-ordinate(NE) Reference: Vertical (TVD) Reference: :' 17:04:0-4 Page? 8 Well: 02-39, True North 02-39 61.5 Db: .Oracle ', Rule Assigned: Major Risk Inter-Site Error: 0.00 ft jor Axis Ctr-Ctr No-Go Allowable Offset TFO+AZI TFO-HS CasipglH~istance Area Deviation .Warning ft deg deg In, ft, ft ft i 11799.22 ~ 8859.49 9725.00 8693.67 45.11 36.55 279.75 15.31 171.93 125.91 46.02 Pass 11793.24 8859.41 9750.00 8709.04 44.76 36.24 288.17 23.01 163.38 150.98 12.40 Pass ~i 11787.68 8859.33 9775.00 8723.94 44.44 35.96 297.27 31.45 158.72 177.73 -19.01 FAIL ~I 11782.42 8859.26 9800.00 8738.66 44.13 35.69 306.66 40.20 157.91 203.00 -45.09 ~ FAIL 11777.84 8859.19 9825.00 8752.80 43.86 35.45 315.84 48.83 161.65 224.50 -62.84 FAIL 11773.83 8859.13 9850.00 8766.27 43.62 35.24 324.31 56.83 169.72 240.72 -71.00 FAIL 11770.31 8859.08 9875.00 8779.43 43.40 35.06 331.83 63.92 181.21 251.82 -70.61 FAIL 11767.53 8859.04 9900.00 8792.31 43.22 34.92 338.29 70.04 195.55 258.81 -63.26 FAIL j 11765.66 8859.02 9925.00 8804.40 43.10 34.83 343.58 75.12 212.63 262.84 -50.21 FAIL 11764.39 8859.00 9950.00 8815.02 43.02 34.77 347.70 79.08 232.23 264.84 -32.61 FAIL 11764.09 8858.99 9975.00 8823.97 43.01 34.77 350.72 82.07 253.78 265.88 -12.10 FAIL 11764.63 8859.00 10000.00 8831.37 43.04 34.81 352.86 84.27 276.60 266.53 10.07 Pass 11766.05 8859.02 10025.00 8837.62 43.13 34.90 354.33 85.91 300.08 267.16 32.92 Pass 11768.47 8859.06 10050.00 8842.99 43.28 35.05 355.29 87.16 323.81 268.01 55.80 Pass 11771.58 8859.10 10075.00 8847.01 43.47 35.23 355.76 88.01 347.73 269.07 78.66 Pass ~ 11774.29 8859.14 10100.00 8850.13 43.64 35.39 356.04 88.61 371.99 269.97 102.02 Pass '~ 11776.58 8859.17 10125.00 8852.88 43.78 35.53 356.25 89.09 396.43 270.69 125.74 Pass i, ~, 11778.66 8859.20 10150.00 8855.52 43.90 35.65 356.41 89.50 420.97 271.34 149.63 Pass ', 11780.43 8859.23 10175.00 8858.08 44.01 35.76 356.55 89.85 445.59 271.90 173.70 Pass 11780.85 8859.23 10200.00 8860.18 44.03 35.78 356.76 90.12 470.47 271.96 198.52 Pass 11781.34 8859.24 10225.00 8861.86 44.06 35.80 356.89 90.30 495.39 272.06 223.33 Pass 11783.07 8859.27 10250.00 8863.11 44.16 35.91 356.80 90.42 520.10 272.65 247.45 Pass i 11784.79 8859.29 10275.00 8863.52 44.27 36.01 356.62 90.45 544.84 273.24 271.60 Pass 11786.43 8859.31 10300.00 8863.15 44.36 36.10 356.36 90.39 569.57 273.82 295.75 Pass 11788.01 8859.34 10325.00 8862.08 44.45 36.18 356.05 90.26 594.29 274.39 319.90 Pass 11789.47 8859.36 10350.00 8860.54 44.54 36.26 355.72 90.11 619.02 274.94 344.08 Pass ~, 11790.81 8859.37 10375.00 8858.92 44.62 36.33 355.41 89.96 643.77 275.42 368.34 Pass 11792.16 8859.39 10400.00 8857.24 44.70 36.41 355.10 89.82 668.50 275.92 392.58 Pass ~', 11793.50 8859.41 10425.00 8855.54 44.78 36.48 354.81 89.68 693.24 276.41 416.83 Pass 11794.77 8859.43 10450.00 8853.94 44.85 36.55 354.54 89.56 717.99 276.87 441.13 Pass 11795.93 8859.44 10475.00 8852.53 44.92 36.61 354.30 89.47 742.79 277.29 465.50 Pass 11800.00 8859.50 10500.00 8851.27 45.16 36.91 353.74 89.39 767.64 278.94 488.70 Pass 11800.00 8859.50 10525.00 8849.92 45.16 36.89 353.66 89.31 792.44 278.87 513.57 Pass 11800.00 8859.50 10550.00 8848.07 45.16 36.85 353.55 89.20 817.16 278.78 538.38 Pass 11800.00 8859.50 10575.00 8845.66 45.16 36.81 353.40 89.06 841.79 278.68 563.11 Pass 11800.00 8859.50 10600.00 8843.00 45.16 36.76 353.25 88.90 866.32 278.56 587.76 Pass i 11800.00 8859.50 10625.00 8840.87 45.16 36.70 353.14 88.79 890.70 278.40 612.30 Pass i 11806.27 8859.58 10650.00 8839.34 45.50 37.16 352.33 88.73 914.83 280.84 633.99 Pass '~ 11808.28 8859.61 10675.00 8838.21 45.61 37.27 352.05 88.69 939.11 281.50 657.61 Pass ' ~I 11809.97 8859.63 10700.00 8837.17 45.71 37.36 351.82 88.66 963.59 282.04 681.55 ~ Pass i ', 11811.87 8859.65 10725.00 8836.01 45.81 37.46 351.55 88.63 987.90 282.67 705.23 Pass j 11813.83 8859.68 10750.00 8834.63 45.92 37.56 351.27 88.58 1012.14 283.30 728.83 Pass 11815.77 8859.70 10775.00 8832.89 46.03 37.66 350.97 88.52 1036.35 283.93 752.43 Pass 11817.77 8859.73 10800.00 8830.84 46.14 37.76 350.65 88.44 1060.47 284.57 775.90 Pass 11825.00 8859.82 10825.00 8828.64 46.53 38.30 349.71 88.36 1084.43 287.41 797.01 Pass i 11825.00 8859.82 10850.00 8826.34 46.53 38.22 349.62 88.28 1108.32 287.20 821.12 Pass 11825.00 8859.82 10875.00 8823.75 46.53 38.15 349.52 88.18 1132.28 286.99 845.29 Pass 11825.00 8859.82 10900.00 8820.82 46.53 38.08 349.41 88.06 1156.22 286.77 869.45 Pass 11825.00 8859.82 10925.00 8817.78 46.53 38.00 349.30 87.95 1180.03 286.54 893.49 Pass ~~ 11825.00 8859.82 10950.00 8815.00 46.53 37.91 349.20 87.85 1203.73 286.30 917.43 Pass ~' bP ~ BP Alaska '~ s Anticollision Re ort P IINTEQ Company:. BP Amoco Date. 3/19/2008 Time. 17:04:04 Page: 9 ~ Fields Prudhoe Bay 1eference Site: PB DS 02 Co-ordinate(NE) Reference: We11: 02-39, True North ', Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61.5 i Reference. Wellpath: Plan 5, 02=39A Db: Oracle Site: PB DS 02 Well: 02-38L1 Rule Assigned: Major Risk Wellpath: 02-38L1 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis ' Ctr-Ctr No-Co Allowable j ~; MD ` TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/flsflistance Area.... Deviation Warning ~ ft ft ft ft ft ft deg deg in ft ft ft 11832.80 8859.91 10975.00 8812.42 46.93 38.51 348.19 87.78 1227.27 289.28 937.99 Pass 11834.95 8859.94 11000.00 8810.03 47.03 38.61 347.87 87.71 1251.00 289.94 961.06 Pass 11836.88 8859.96 11025.00 8807.86 47.13 38.71 347.58 87.66 1274.97 290.52 984.45 Pass 11838.59 8859.98 11050.00 8805.92 47.22 38.79 347.33 87.62 1299.13 291.04 1008.09 Pass 11840.16 8860.00 11075.00 8804.22 47.30 38.87 347.11 87.58 1323.42 291.51 1031.91 Pass 11841.52 8860.01 11100.00 8802.84 47.37 38.94 346.93 87.57 1347.88 291.92 1055.96 Pass 11842.79 8860.03 11125.00 8801.74 47.43 39.00 346.78 87.57 1372.40 292.30 1080.10 Pass '~ 11850.00 8860.11 11150.00 8800.78 47.79 39.60 345.93 87.58 1397.05 295.19 1101.86 Pass 11850.00 8860.11 11175.00 8799.83 47.79 39.56 345.93 87.58 1421.75 295.08 1126.67 Pass Site: PB DS 02 Well: 02-39 Wellpath: 02-39 V2 Reference Offset MD TVD MD TVD ft ft ft _ft Rule Assigned: Major Risk Inter-Site Error: 0.00 ft iemi-Major Axis Ctr-Ctr No-Go Allowable Ref Offset TFO+AZFTFO-HS Casing/HSDistance Area Deviation Warning ft ft deg deg in ft ft ft Iii ----- ---=--- -- - -- -----1' 10275.00 8710.58 10275.00 8710.57 58.31 56.87 26.56 0.00 0.02 278.61 -278.60 FAIL 1 10300.01 8726.11 10300.00 8725.86 57.28 55.91 347.50 323.47 0.39 316.15 -315.76 FAIL 10325.04 8739.82 10325.00 8740.00 54.95 53.71 258.60 239.00 0.41 257.77 -257.37 FAIL II 10349.97 8751.87 10350.00 8753.15 51.45 50.28 185.01 171.91 1.45 200.25 -198.80 FAIL 10374.77 8763.15 10375.00 8765.57 47.43 46.40 153.00 147.41 3.23 277.39 -274.16 FAIL 10399.20 8774.10 10400.00 8777.48 43.04 42.11 128.29 130.06 5.86 286.36 -280.50 FAIL 10423.01 8784.49 10425.00 8789.16 38.37 37.57 112.08 120.91 10.05 260.26 -250.21 FAIL 1 10445.97 8794.13 10450.00 8800.40 33.70 33.01 100.37 115.91 15.72 225.07 -209.34 FAIL 10467.90 8802.88 10475.00 8810.78 29.34 28.75 90.28 112.09 22.79 187.87 -165.08 FAIL 10488.66 8810.65 10500.00 8819.89 25.81 25.34 80.88 108.49 31.23 152.28 -121.05 FAIL 10508.24 8817.48 10525.00 8827.75 23.67 23.50 72.53 105.50 40.81 123.31 -82.50 FAIL 10526.72 8823.40 10550.00 8834.38 22.96 23.13 65.07 102.99 51.30 105.94 -54.65 FAIL 1 10544.29 8828.54 10575.00 8840.03 23.20 23.53 58.53 101.07 62.31 104.54 -42.23 FAIL 10560.93 8832.92 10600.00 8844.75 23.96 24.34 52.67 99.50 74.04 116.12 -42.09 FAIL I~ 10576.33 8836.53 10625.00 8848.37 25.08 25.40 47.26 98.01 87.11 133.77 -46.67 FAIL 1 1 10593.11 8839.97 10650.00 8850.78 25.24 25.58 43.62 96.22 101.65 145.42 -43.77 FAIL 1 10610.15 8842.98 10675.00 8852.12 25.17 25.50 40.77 94.55 116.82 153.77 -36.96 FAIL 1 1 10626.40 8845.40 10700.00 8852.77 25.16 25.49 38.31 93.21 132.86 160.86 -28.00 FAIL 1 10641.70 8847.25 10725.00 8853.23 25.26 25.54 36.36 92.30 150.00 166.86 -16.87 FAIL ', 10656.57 8848.67 10750.00 8853.69 25.41 25.64 34.77 91.72 167.45 172.08 -4.63 FAIL ', 1 10671.12 8849.69 10775.00 8854.15 25.62 25.81 33.45 91.38 185.09 176.82 8.26 Pass !, 10685.19 8850.33 10800.00 8854.60 25.92 26.02 32.33 91.21 203.04 181.27 21.77 Pass 10698.78 8850.62 10825.00 8855.01 26.24 26.28 31.34 91.14 221.29 185.36 35.93 Pass 10710.93 8850.65 10850.00 8855.37 26.99 26.95 30.17 91.13 239.71 190.72 48.99 Pass 10721.71 8850.65 10875.00 8855.75 27.95 27.85 28.87 91.13 258.57 196.73 61.84 Pass ', ', 10732.06 8850.65 10900.00 8856.16 28.88 28.73 27.64 91.14 277.65 202.51 75.14 Pass 10742.04 8850.65 10925.00 8856.59 29.79 29.58 26.45 91.15 296.87 208.09 88.78 Pass 10751.60 8850.65 10950.00 8857.00 30.65 30.41 25.31 91.15 316.32 213.44 102.89 Pass '; 10760.73 8850.65 10975.00 8857.40 31.48 31.20 24.21 91.15 336.05 218.51 117.54 Pass ~, 10769.43 8850.65 11000.00 8857.78 32.28 31.95 23.16 91.15 356.04 223.35 132.70 Pass 10777.73 8850.65 11025.00 8858.12 33.03 32.67 22.16 91.14 376.29 227.94 148.35 Pass 10785.65 8850.65 11050.00 8858:39 33.74 33:35 21.19 91.12 396.79 232.28 164.51 Pass 10793.19 8850.65 11075.00 8858.61 34.43 34.00 20.26 91.09 417.52 236.40 181.12 Pass 10800.00 8850.65 11100.00 8858.75 35.04 34.58 19.41 91.06 438.50 240.10 198.40 Pass 10807.16 8850.65 11125.00 8858.81 35.68 35.19 18.51 91.02 459.73 243.96 215.77 Pass ' I 10813.73 8850.65 11150.00 8858.81 36.26 35.75 17.67 90.97 481.05 247.48 233.57 Pass ~I bP ~ BP Alaska Anticollision Re ort P ~ s 1NTEQ Company:. BP Amoco - --- Date: 3/19/2008 Time: 17:04:04 Page: 10 :Field: Prudhoe Bay ': Reference Site: PB DS 02 Co-ordinate(NE) Reference: Weli: t?2-39, True North .Reference Well: 02-39 Vertical (TVD) Reference: 02-39 61.5 L Reference Wellpathz Plan 5, 02-39A _ _ _ Dbt Oracle j Site: PB DS 02 _ Well: 02-39 Rule Ass igned: Major Risk Wellpath: 02-39 V2 - -- Inter-Site Error: 0.00 ft - Reference Offset -- __ _ Semi-Major Axis _---- Ctr-Ctr No-Go Allowable - z MD TVD MD TVD Ref Offset: TFO+AZI TFO-HS 'Casing/H~istance Area Deviation Warning ~~ ft ft ft ft ft; ft deg deg in ft ft ft i 10820.08 8850.65 11175.00 8858.78 36.82 36.29 16.87 90.93 502.47 250.89 251.58 Pass 10825.00 8850.65 11200.00 8858.77 37.26 36.69 16.24 90.89 524.13 253.46 270.67 Pass 10831.84 8850.65 11225.00 8858.68 37.85 37.28 15.37 90.84 545.96 257.09 288.87 Pass II 10837.25 8850.65 11250.00 8858.53 38.32 37.73 14.67 90.79 568.04 259.91 308.12 Pass ', 10842.41 8850.65 11275.00 8858.36 38.76 38.16 14.01 90.75 590.27 262.60 327.67 Pass !i 10850.00 8850.65 11300.00 8858.18 39.42 38.82 13.05 90.70 612.57 266.66 345.92 Pass 10850.00 8850.65 11325.00 8857.88 39.42 38.74 13.00 90.65 634.99 266.41 368.58 Pass 10856.84 8850.65 11350.00 8857.62 39.99 39.34 12.13 90.61 657.47 269.99 387.48 Pass 10861.34 8850.65 11375.00 8857.29 40.36 39.70 11.55 90.56 680.01 272.25 407.75 Pass I~ 10865.69 8850.65 11400.00 8856.71 40.73 40.05 10.96 90.49 702.61 274.44 428.18 Pass 10869.86 8850.65 11425.00 8855.88 41.08 40.38 10.38 90.41 725.33 276.53 448.79 Pass ~ 10875.00 8850.65 11450.00 8855.01 41.50 40.81 9.68 90.33 748.16 279.17 468.99 Pass 'i 10875.00 8850.65 11475.00 8854.45 41.50 40.73 9.63 90.28 771.14 278.95 492.18 Pass 10881.25 8850.65 11500.00 8853.98 42.01 41.28 8.84 90.24 794.24 282.15 512.09 Pass 10884.68 8850.65 11525.00 8853.34 42.28 41.54 8.38 90.19 817.47 283.80 533.67 Pass ~i 10887.98 8850.65 11550.00 8852.51 42.54 41.80 7.92 90.13 840.76 285.39 555.37 Pass 10891.16 8850.65 11575.00 8851.45 42.80 42.04 7.46 90.05 864.12 286.93 577.19 Pass 10894.12 8850.65 11600.00 8850.17 43.04 42.27 7.02 89.97 887.63 288.35 599.28 Pass ~, 10900.00 8850.65 11625.00 8848.60 43.51 42.78 6.22 89.87 911.32 291.38 619.94 Pass j 10900.00 8850.65 11650.00 8846.70 43.51 42.73 6.11 89.76 935.14 291.23 643.91 Pass 10900.00 8850.65 11675.00 8844.47 43.51 42.67 5.98 89.63 959.26 291.09 668.16 Pass 10900.00 8850.65 11700.00 8842.04 43.51 42.62 5.85 89.50 983.34 290.96 692.39 Pass ~i 10905.71 8850.65 11725.00 8840.16 43.94 43.13 5.07 89.40 1007.35 293.86 713.49 Pass 10908.03 8850.65 11750.00 8839.41 44.12 43.30 4.76 89.38 1031.26 294.92 736.34 Pass 10910.57 8850.65 11775.00 8839.63 44.32 43.49 4.48 89.40 1054.91 296.08 758.84 Pass 10913.07 8850.65 11800.00 8839.99 44.51 43.68 4.21 89.43 1078.55 297.22 781.34 Pass ', 10915.45 8850.65 11825.00 8840.40 44.69 43.86 3.96 89.47 1102.30 298.29 804.01 Pass ~, 10917.69 8850.65 11850.00 8840.83 44.86 44.02 3.73 89.50 1126.14 299.30 826.84 Pass ~, ~, 10925.00 8850.65 11875.00 8841.13 45.42 44.69 2.87 89.53 1150.03 303.01 847.02 Pass ~I ~, 10925.00 8850.65 11900.00 8840.96 45.42 44.63 2.88 89.53 1173.75 302.83 870.92 Pass 10925.00 8850.65 11925.00 8840.23 45.42 44.57 2.85 89.50 1197.43 302.63 894.79 Pass 10925.00 8850.65 11950.00 8839.12 45.42 44.51 2.81 89.46 1221.10 302.44 918.65 Pass 10925.00 8850.65 11975.00 8837.87 45.42 44.44 2.76 89.41 1244.76 302.25 942.51 Pass ~~ ', 10925.00 8850.65 12000.00 8836.48 45.42 44.37 2.71 89.36 1268.41 302.05 966.36 Pass ', 10933.41 8850.65 12025.00 8834.80 46.03 45.15 1.64 89.30 1291.98 306.27 985.71 Pass '~ 10935.50 8850.65 12050.00 8833.11 46.18 45.30 1.32 89.24 1315.69 307.18 1008.51 Pass 10937.52 8850.65 12074.99 8831.41 46.32 45.44 1.02 89.18 1339.44 308.06 1031.38 Pass 10939.47 8850.65 12100.00 8829.72 46.46 45.57 0.73 89.12 1363.27 308.90 1054.37 Pass 10941.34 8850.65 12125.00 8828.12 46.60 45.70 0.46 89.07 1387.17 309.71 1077.46 Pass ~I 10943.18 8850.65 12150.00 8826.59 46.73 45.83 0.19 89.02 1411.08 310.51 1100.57 Pass 10950.00 8850.65 12175.00 8825.07 47.23 46.46 359.33 88.98 1435.05 313.91 1121.14 Pass Site: PB DS 02 Well: 02-39 Rule Ass igned: Major Risk Wellpath: 02-39L1 V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis . Ctr-Ctr Na-Go Allowable MD TVD MD TVD ' Ref Offset TFO+A ZI TFO-HS Casing/HSDistance Area Deviation Warning '~ ft ft ft ft ft ft deg deg in ft ft ft j 10275.00 8710.58 10275.00 8710.57 58.31 58.33 26.56 0.00 0.02 279.69 279.68 _ FAIL 10300.01 8726.11 10300.00 8725.86 57.28 57.33 347.50 323.47 0.39 319.64 -319.25 FAIL 0 10349_89 8751.84 10350.00 __ 8752.84 51 46 51.54 143_30 130.9 .74 1 325.19 -323.45 FAIL _ _ . . _ _ bP ! BP Alaska ~ ~~ Anticollision Re ort P INTEQ i Company:. ` BP Amoco ' Field: Prudhoe Bay Reference Site: PB DS 02 ReferenceWelL• I 02-39 ii Reference Wellpathc Plan 5, 02-3914 Site: PB DS 02 Well: 02-39 Wellpath: 02-39L1 V3 Date: 3/19/2008 Time. 17:04:04 Co-ordinate(NE} Reference: Wel[: 02-39,7rue North Vertical (T~'D} Reference: 02-39 61.5 Rule Assigned: Major Risk Inter-Site Error: 0.00 ft Page: 11 Db: Oracle xeterence vtiset Jeml-Major Axis Ctr-C[r tVO-GO Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casin Sflistance Area Deviation Warnin ft ft ft ft ft ft deg ___ -deg in ~ ft ft ft g 10373.90 8762.75 10375.00 8764.31 47.57 47.69 111.03 105.19 6.68 315.11 -308.43 FAIL 10396.79 8773.03 10400.00 8775.09 43.48 43.59 98.63 99.68 13.66 279.92 -266.26 FAIL 10418.60 8782.60 10425.00 8785.01 39.26 39.38 89.56 97.10 21.70 244.89 -223.19 FAIL 10439.30 8791.38 10450.00 8793.84 35.06 35.20 81.45 95.06 30.68 210.64 -179.97 FAIL ' 110459.06 8799.41 10475.00 8801.48 31.03 31.20 73.92 93.22 40.10 178.56 -138.46 FAIL I~ 10477.71 8806.62 10500.00 8808.05 27.48 27.67 67.19 91.75 50.57 151.15 -100.58 FAIL 110495.54 8813.11 10525.00 8813.56 24.82 24.97 60.94 90.44 61.37 130.10 -68.72 FAIL ~', .10512.44 8818.87 10550.00 8817.68 23.41 23.51 54.91 89.01 72.84 118.35 -45.51 FAIL 10528.33 8823.90 10575.00 8820.31 22.97 23.14 49.12 87.47 85.18 117.69 -32.50 FAIL ', 10543.53 8828.33 10600.00 8821.72 23.17 23.40 43.63 85.97 97.81 126.05 -28.24 FAIL ~ 10558.30 8832.26 10625.00 8822.49 23.82 24.04 38.59 84.75 110.41 139.04 -28.63 FAIL 110572.34 ~ 8835.63 10650.00 8823.07 24.79 24.95 34.28 84.02 123.90 153.50 -29.60 FAIL 10587.59 8838.89 10675.00 8823.93 25.29 25.47 31.45 83.66 138.39 163.58 -25.20 FAIL ~, 10605.17 8842.16 10700.00 8824.99 25.18 25.33 30.04 83.47 153.17 167.93 -14.76 FAIL 110622.66 8844.88 10725.00 8826.12 25.15 25.28 28.88 83.52 167.82 171.92 -4.10 FAIL ' 10640.00 8847.07 10750.00 8827.01 25.25 25.33 27.82 83.65 182.38 175.89 6.49 Pass .10657.15 8848.72 10775.00 8827.56 25.42 25.47 26.82 83.81 196.90 179.78 17.12 Pass 110674.35 8849.87 10800.00 8828.22 25.67 25.72 25.95 84.10 210.95 183.59 27.35 Pass ~, 110691.15 8850.50 10825.00 8828.29 26.06 26.06 25.06 84.34 225.32 187.57 37.76 Pass ' 10706.93 8850.64 10850.00 8827.38 26.64 26.63 23.96 84.44 240.13 192.09 48.04 Pass .10719.83 8850.65 10875.00 8825.43 27.78 27.77 22.31 84.34 255.69 199.22 56.47 Pass i ~, 10732.35 8850.65 10900.00 8823.51 28.91 28.90 20.73 84.26 271.46 206.16 65.30 Pass ~~, ' 10744.59 8850.65 10925.00 8821.33 30.02 30.01 19.14 84.14 287.26 212.97 74.29 Pass '~ 10756.42 8850.65 10950.00 8818.81 31.09 31.08 17.55 83.98 303.37 219.51 83.85 Pass ', 10767.93 8850.65 10975.00 8816.84 32.14 32.13 16.13 83.93 319.64 225.85 93.79 Pass 10779.01 8850.65 11000.00 8815.45 33.14 33.13 14.86 83.99 336.29 231.90 104.38 Pass ' 10789.98 8850.65 11025.00 8814.47 34.14 34.12 13.66 84.11 352.68 237.87 114.82 Pass 10800.65 8850.65 11050.00 8813.94 35.10 35.08 12.57 84.30 369.26 243.63 125.62 Pass '~ ' 10811.08 8850.65 11075.00 8813.68 36.02 36.02 11.52 84.50 385.85 249.21 136.65 Pass '~ ' 10821.45 8850.65 11100.00 8813.76 36.94 36.93 10.51 84.74 402.16 254.72 147.44 Pass ' 10831.58 8850.65 11125.00 8813.60 37.83 37.82 9.48 84.92 418.58 260.04 158.54 Pass ' 10841.42 8850.65 11150.00 8813.10 38.68 38.68 8.43 85.05 435.26 265.14 170.12 Pass 10850.00 8850.65 11175.00 8812.49 39.42 39.40 7.51 85.16 452.39 269.52 182.87 Pass ' 10859.94 8850.65 11200.00 8811.77 40.25 40.25 6.41 85.25 469.90 274.57 195.33 Pass 10868.68 8850.65 11225.00 8810.66 40.98 40.98 5.40 85.30 487.78 278.94 208.84 Pass 10876.97 8850.65 11250.00 8809.12 41.66 41.67 4.40 85.29 506.21 283.03 223.18 Pass I 10884.81 8850.65 11275.00 8807.21 42.29 42.30 3.43 85.26 525.18 286.81 238.37 Pass ~ 10892.16 8850.65 11300.00 8805.08 42.88 42.89 2.49 85.20 544.74 290.32 254.42 Pass 10900.00 8850.65 11325.00 8802.92 43.51 43.53 1.50 85.15 564.48 294.08 270.40 Pass 10906.09 8850.65 11350.00 8801.06 43.97 43.99 0.75 85.13 584.48 296.85 287.63 Pass 10912.54 8850.65 11375.00 8799.38 44.47 44.49 -0.02 85.14 604.89 299.80 305.09 Pass I 10918.53 8850.65 11400.00 8797.57 44.92 44.94 359.26 85.13 625.81 302.52 323.29 Pass 10925.00 8850.65 11425.00 8795.67 45.42 45.44 358.47 85.13 647.08 305.50 341.58 Pass I 10929.54 8850.65 11450.00 8793.88 45.75 45.76 357.93 85.13 668.58 307.43 361.15 I Pass i 10934.70 8850.65 11475.00 8793.19 46.12 46.14 357.41 85.22 690.22 309.69 380.54 Pass 10939.52 8850.65 11500.00 8793.18 46.47 46.49 356.98 85.37 712.15 311.79 400.36 Pass 10943.84 8850.65 11525.00 8792.33 46.78 46.80 356.53 85.45 734.64 313.66 420.98 Pass 10950.00 8850.65 11550.00 8790.55 47.23 47.29 355.80 85.45 757.68 316.45 441.23 Pass 10950.89 8850.65 11575.00 8788.31 47.29 47.30 355.66 85.42 781.19 316.66 464.53 Pass 10953.64 8850.65 11600.00 8786.05 47.48 47.50 355.31 85.40 805.10 317.80 487.29 Pass 10954.27 8850.65 11625.00 8784.59 47.52 47.50 355.27 85.43 829.27 317.95 511.32 Pass bP ~ BP Alaska Anticollision Re ort l~ iNTEQ Company: BP Amoco ~ Field: Prudhoe Bay , ' Reference Site: PB DS 02 Reference Well: 02-39 Reference Wellpath6 Plan 5, 02-39A Site: PB DS 02 Date: 3/1.9!2008 Time: 1T04:04' Co-ordinate(NE~ Reference: WeIL 02-39, True North Vertical (TVD) References. 02-39 61.5 Pager 12 Db: Oracle Well: Wellpath: 02-39 02-39L1 V3 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft Reference Offset ' `Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD M D TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ' ft ft ft deg deg in ft ft ft 10958. 00 8850. 65 11650. 00 8784. 08 47. 78 47. 80 354. 92 85 .53 853 .60 319 .61 534. 00 Pass 10959. 76 8850. 65 11675. 00 8784. 20 47. 89 47. 92 354. 84 85 .66 878 .02 320 .34 557. 68 Pass ~, 10961. 14 8850 .65 11700. 00 8784. 33 47. 99 48. 01 354. 80 85 .79 902 .63 320 .93 581. 70 Pass 10962. 09 8850. 65 11725. 00 8784. 16 48. 05 48. 08 354. 79 85 .89 927 .42 321 .32 606. 09 Pass 10962. 82 8850. 65 11750. 00 8784. 01 48. 10 48. 12 354. 80 85 .99 952 .27 321 .63 630. 64 Pass 10963. 22 8850. 65 11775. 00 8783. 06 48. 13 48. 15 354. 80 86 .03 977 .23 321 .80 655. 43 Pass 10963. 28 8850. 65 11800. 00 8781. 43 48. 13 48. 16 354. 79 86 .04 1002 .22 321 .83 680. 40 Pass 10963. 08 8850 .65 11825. 00 8780. 04 48. 12 48. 14 354. 84 86 .06 1027 .21 321 .75 705. 46 Pass 10962. 82 8850. 65 11850. 00 8779. 81 48. 10 48. 12 354. 95 86 .14 1052 .15 321 .65 730. 50 Pass 10962. 86 8850. 65 11875. 00 8780. 90 48. 10 48. 13 355. 09 86 .29 1077 .00 321 .69 755. 31 Pass 10963. 35 8850. 65 11900. 00 8782. 31 48. 14 48. 16 355. 19 86 .44 1101 .76 321 .91 779. 86 Pass 10964. 27 8850 .65 11925. 00 8783. 62 48. 20 48. 22 355. 22 86 .59 1126 .41 322 .29 804. 12 Pass l 10965. 48 8850 .65 11950. 00 8784. 63 48. 28 48. 30 355. 20 86 .71 1150 .95 322 .79 828. 15 Pass i 10966. 84 8850 .66 11975. 00 8784. 99 48. 37 48. 39 355. 13 86 .80 1175 .45 323 .34 852. 10 Pass 10968. 42 8850. 66 12000. 00 8785. 24 48. 48 48. 50 355. 01 86 .87 1199 .78 323 .99 875. 79 Pass 10970. 12 8850 .66 12025. 00 8785. 24 48. 59 48. 61 354. 87 86 .94 1224 .01 324 .68 899. 33 Pass 10975. 00 8850 .66 12050. 00 8785. 32 48. 92 49. 03 354. 35 87 .00 1248 .09 326 .92 921. 17 Pass 10975. 00 8850. 66 12075. 00 8784. 92 48. 92 48. 97 354. 39 87 .04 1271 .97 326 .74 945. 24 Pass 10975. 00 8850. 66 12100. 00 8783. 46 48. 92 48. 90 354. 38 87 .03 1295 .71 326 .53 969. 18 Pass Ii 10975. 00 8850. 66 12125. 00 8781. 72 48. 92 48. 83 354. 35 87 .00 1319 .33 326 .32 993. 02 Pass ', 10975. 00 8850 .66 12150. 00 8779. 34 48. 92 48. 75 354. 30 86 .95 1342 .77 326 .08 1016. 68 Pass 10982. 99 8850. 67 12175. 00 8776. 98 49. 43 49. 46 353. 30 86 .91 1365 .94 329 .70 1036. 24 Pass 10985. 46 8850. 67 12200. 00 8775. 09 49. 58 49. 62 352. 97 86 .88 1389 .02 330 .64 1058. 38 Pass i~ 10987.92 8850.67 12225.00 8773.86 49.74 49.77 352.68 86.88 1412.07 331.58 1080.49 Pass i~ 10990.40 8850.68 12250.00 8773.22 49.90 49.93 352.41 86.91 1435.04 332.51 1102.53 Pass Site: PB DS 02 Well: 02-39 Rule Assigned: Major Risk Wellpath: 02-39L1P61 V1 Inter-Site Error: 0.00 ft ~ Reference Offset SemrMajor Axis Ctr-Ctr No-Go Allowable ~ i MD TVB MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning i~ ft ft ft ft ft ft deg deg in ft ft ft 10275.00 8710.58 10275.00 8710.57 58.31 58.33 26.56 0.00 0 .02 279.69 -279.68 FAIL 10300.01 8726.11 10300.00 8725.86 57.28 57.33 347.50 323.47 0 .39 319.64 -319.25 FAIL 10325.04 8739.82 10325.00 8740.00 54.95 55.07 258.60 239.00 0 .41 260.18 -259.77 FAIL 10349.97 8751.87 10350.00 8753.15 51.45 51.55 185.01 171.91 1 .45 201.59 -200.15 FAIL 10374.77 8763.15 10375.00 8765.57 47.43 47.57 153.00 147.41 3 .23 279.80 -276.57 FAIL 10399.20 8774.10 10400.00 8777.48 43.04 43.16 128.29 130.06 5 .86 288.88 -283.02 FAIL 10423.01 8784.49 10425.00 8789.16 38.37 38.51 112.08 120.91 10 .05 262.52 -252.48 FAIL 10445.97 8794.13 10450.00 8800.40 33.70 33.83 100.37 115.91 15 .72 226.93 -211.21 FAIL 10467.90 8802.88 10475.00 8810.78 29.34 29.46 90.28 112.09 22 .79 189.29 -166.50 FAIL 10488.66 8810.65 10500.00 8819.89 25.81 25.94 80.88 108.49 31 .23 153.24 -122.01 FAIL 10508.24 8817.48 10525.00 8827.75 23.67 23.96 72.53 105.50 40 .81 123.79 -82.98 FAIL 10526.72 8823.40 10550.00 8834.38 22.96 23.50 65.07 102.99 51 .30 106.01 -54.71 FAIL 10544.29 8828.54 10575.00 8840.03 23.20 23.88 58.53 101.07 62 .31 104.58 -42.27 FAIL 10560.93 8832.92 10600.00 8844.75 23.96 24.71 52.67 99.50 74 .04 116.46 -42.43 FAIL 10576.33 8836.53 10625.00 8848.37 25.08 25.80 47.26 98.01 87 .11 134.50 -47.39 FAIL 10593.11 8839.97 10650.00 8850.78 25.24 25.99 43.62 96.22 101 .65 146.36 -44.71 FAIL 10610.15 8842.98 10675.00 8852.12 25.17 25.91 40.77 94.55 116 .82 154.86 -38.04 FAIL 10626.57 8845.42 10700.00 8852.82 25.16 25.89 38.32 93.23 132 .65 162.07 -29.42 FAIL 10642.20 8847.31 10725.00 8853.27 25.26 25.92 36.33 92.30 149 .35 168.27 -18:91 FAIL 10656.68 8848.68 10750.00 8852.45 25.41 26.01 34.34 91.29 167 .13 173.87 -6.74 FAIL by ~ BP Alaska Anticollision Re ort P B/f~R ~ yes 1NTEQ Company: BP Amoco Date: 3/1.9/2008 Time: 17:04:04 Page: 13 Field: Prudhoe Bay Reference Site: PB DS 02 Co-ordinate(NE) Reference: - WetL 02-39, True North ' Reference Welld 02-39 Vertical (TVD) Reference:. 02-39 ti1 .5 1 Reference Wellpath: Plan 5, 02-39A Db: Oracle Site: PB DS 0 2 Well: 02-39 Rule Assigned: Major Risk Wellpath: 02-391.1 PB1 V1 Inter-Site Error: 0.00 ft Reference ! Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDisG-nce Area. Deviation Warning ft ft ft ft ft ft deg deg in ft ft_ ft ', 10670.22 8849.64 10775.00 8850.68 25.61 26.14 32.45 90.32 185.72 178.86 6.87 Pass 10682.86 8850.25 10800.00 8848.51 25.87 26.33 30.79 89.52 205.09 183.23 21.87 Pass 110694.37 8850.56 10825.00 8846.26 26.14 26.54 29.41 88.91 225.42 186.90 38.52 Pass 10704.85 8850.64 10850.00 8843.91 26.45 26.81 28.20 88.43 246.42 190.20 56.22 Pass 10713.06 8850.65 10875.00 8841.22 27.18 27.51 26.76 87.98 267.90 194.98 72.92 Pass 10720.34 8850.65 10900.00 8838.46 27.83 28.14 25.50 87.59 290.00 199.20 90.80 Pass 10726.77 8850.65 10925.00 8836.21 28.40 28.70 24.49 87.35 312.66 202.87 109.79 Pass 10732.40 8850.65 10950.00 8834.72 28.91 29.19 23.74 87.28 335.80 206.04 129.76 Pass 10737.42 8850.65 10975.00 8833.85 29.37 29.62 23.18 87.32 359.25 208.81 150.44 Pass !,, 10742.77 8850.65 11000.00 8833.23 29.85 30.10 22.60 87.39 382.36 211.78 170.59 Pass 10747.93 8850.65 11025.00 8832.27 30.32 30.55 22.00 87.40 405.52 214.65 190.87 Pass 10753.07 8850.65 11050.00 8831.21 30.79 31.01 21.38 87.40 428.59 217.50 211.10 Pass !, 10758.14 8850.65 11075.00 8830.16 31.25 31.45 20.77 87.40 451.62 220.31 231.31 Pass 10763.11 8850.65 11100.00 8828.71 31.70 31.89 20.13 87.35 474.63 223.08 251.55 Pass 10767.88 8850.65 11125.00 8826.85 32.14 32.32 19.46 87.26 497.68 225.75 271.93 Pass 10772.72 8850.65 11150.00 8825.05 32.58 32.75 18.80 87.18 520.59 228.44 292.15 Pass 10777.71 8850.65 11175.00 8823.45 33.03 33.19 18.15 87.13 543.25 231.20 312.05 Pass 10782.74 8850.65 11200.00 8821.86 33.48 33.64 17.50 87.08 565.77 233.96 331.81 Pass ~ 10787.69 8850.65 11225.00 8819.80 33.93 34.08 16.82 86.99 588.23 236.68 351.55 Pass II 10792.65 8850.65 11250.00 8817.36 34.38 34.52 16.10 86.87 610.55 239.42 371.13 Pass 10800.00 8850.65 11275.00 8814.75 35.04 35.21 15.10 86.75 632.69 243.57 389.12 Pass 10800.00 8850.65 11300.00 8812.07 35.04 35.11 14.97 86.62 654.63 243.28 411.35 Pass 10808.01 8850.65 11325.00 8809.24 35.75 35.87 13.88 86.49 676.17 247.76 428.41 Pass 10813.42 8850.65 11350.00 8806.42 36.23 36.34 13.10 86.36 697.37 250.67 446.69 Pass 10818.87 8850.65 11375.00 8803.95 36.71 36.82 12.36 86.27 718.36 253.59 464.77 Pass 10825.00 8850.65 11400.00 8802.22 37.26 37.37 11.59 86.24 739.31 256.89 482.43 Pass i~ 10829.58 8850.65 11425.00 8801.57 37.65 37.75 11.10 86.30 760.26 259.22 501.04 Pass 10834.75 8850.65 11450.00 8801.86 38.10 38.19 10.60 86.42 781.23 261.90 519.33 Pass ~i 10839.80 8850.65 11475.00 8802.97 38.54 38.63 10.16 86.59 802.20 264.51 537.70 Pass I 10844.85 8850.65 11500.00 8805.04 38.97 39.06 9.79 86.82 822.90 267.10 555.80 ~ Pass ii 10850.00 8850.65 11525.00 8807.15 39.42 39.50 9.39 87.04 843.73 269.76 573.98 Pass 10850.00 8850.65 11550.00 8808.42 39.42 39.39 9.55 87.20 864.98 269.40 595.58 Pass 10859.05 8850.65 11575.00 8809.02 40.17 40.25 8.57 87.31 886.17 274.28 611.89 Pass 10863.62 8850.65 11600.00 8809.58 40.55 40.63 8.12 87.41 907.38 276.57 630.81 Pass 10868.20 8850.65 11625.00 8810.18 40.94 41.01 7.67 87.50 928.45 278.85 649:59 Pass ~ 10875.00 8850.65 11650.00 8810.49 41.50 41.63 6.92 87.58 949.50 282.42 667.08 Pass 10875.00 8850.65 11675.00 8810.39 41.50 41.52 6.97 87.62 970.82 282.07 688.74 Pass 10881.25 8850.65 11700.00 8809.98 42.01 42.08 6.25 87.65 992.29 285.27 707.01 Pass ', 10885.29 8850.65 11725.00 8809.19 42.33 42.41 5.77 87.66 1013.92 287.23 726.68 Pass '~, 10889.18 8850.65 11750.00 8807.99 42.64 42.72 5.29 87.64 1035.73 289.11 746.62 Pass I 10892.95 8850.65 11775.00 8806.48 42.94 43.02 4.80 87.61 1057.64 290.93 766.71 Pass '! 10900.00 8850.65 11800.00 8804.80 43.51 43.67 3.91 87.57 1079.60 294.59 785.01 Pass 10900.00 8850.65 11825.00 8803.02 43.51 43.57 3.87 87.52 1101.52 294.28 807.24 Pass 10900.00 8850.65 11850.00 8801.03 43.51 43.46 3.82 87.47 1123.42 293.97 829.45 Pass 10907.54 8850.65 11875.00 8798.87 44.08 44.16 2.85 87.41 1145.16 297.81 847.36 Pass i 110911.27 8850.65 11900.00 8796.98 44.37 44.45 2.36 87.36 1166.65 299.53 867.12 Pass 10914.89 8850.65 11925.00 8795.81 44.65 44.72 1.92 87.35 1188.26 301.19 887.07 Pass 10918.47 8850.65 11950.00 8795.34 44.92 44.99 1.51 87.38 1209.88 302.82 907.06 Pass 10925.00 8850.65 11973.00 8795.63 45.42 45.59 0.78 87.44 1230.09 306.12 923.98 Pass ~ ~ N.~'~ by ~ BP Alaska ~~ Anticollision Re ort l~ 1NTEQ Company: BP Amoco Date: 3/19/2008' Time. 17:04:04 Page: 14 Field: Prudhoe Bay Reference Site: PB DS 02 Co-ordinate(NE) Reference: Well: 02-39, True North ~ Reference-Well: 02-39 Vertical (TVD) Reference: 02-39.61.5 Reference Wellpath: Plan 5, OZ-39A Db: Oracle Site: PB DS 02 Well: 02-39 Rule Assigned: Major Risk Wellpath: 02-39L1 PB2 V1 Inter-Site Error: 0.00 ft Reference Offset - - Semi-Major Axis CtrvCtr No-Go Allowable --- -- MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing(HSflistance Area - Deviation Warning i ft ft ft ft ft ft deg deg. in ft ft ft 10275.00 C 8710.58 10275.00 8710.57 58.31 58.33 26.56 0.00 0.02 279.69 -279.68 FAIL 10300.01 8726.11 10300.00 8725.86 57.28 57.33 347.50 323.47 0.39 319.64 -319.25 FAIL ~ 10325.04 8739.82 10325.00 8740.00 54.95 55.07 258.60 239.00 0.41 260.18 -259.77 FAIL 10349.89 8751.84 10350.00 8752.84 51.46 51.54 143.30 130.19 1.74 325.19 -323.45 FAIL 10373.88 8762.74 10375.00 8764.09 47.57 47.70 108.89 103.04 6.71 313.35 -306.63 FAIL 10396.04 8772.70 10400.00 8773.71 43.62 43.74 93.37 94.19 15.51 272.55 -257.05 FAIL 10415.73 8781.35 10425.00 8781.85 39.82 39.98 84.45 91.14 27.80 238.74 -210.94 FAIL ~, 10432.57 8788.56 10450.00 8788.82 36.43 36.63 78.74 90.38 43.20 212.47 -169.28 FAIL 10446.69 8794.43 10475.00 8795.28 33.55 33.79 75.13 90.88 61.01 192.62 -131.61 FAIL 10458.72 8799.28 10500.00 8801.98 31.10 31.41 72.91 92.11 80.27 177.46 -97.19 FAIL 10469.84 8803.63 10525.00 8809.57 28.98 29.29 71.35 93.71 99.69 163.67 -63.98 FAIL 10480.41 8807.63 10550.00 8817.30 26.99 27.43 69.71 95.03 118.98 151.34 -32.36 FAIL 110490.70 8811.39 10575.00 8825.05 25.52 25.87 67.92 96.09 137.85 138.72 -0.87 FAIL 10500.99 8815.01 10600.00 8833.19 24.12 24.66 66.14 97.13 155.91 128.00 27.91 Pass '..10502.71 8815.60 10604.18 8834.58 24.02 24.50 65.84 97.31 158.85 126.13 32.72 Pass • i Rig Floor to Top of Lubricator ig loot ~/e~~ DS 02-39 2.25 9.23 Hydril Annular 7 1116" Annular x 5000 psi 5.00 ~- 7 1!16" 5000 psi, RX-46 Blind Shears 12,65 f1 TOT -- 13.56 .•~ 2-375" Combi's 2 1116" 5000 psi , R44 I Mud Cross HCR M Mud Cross 14.89 Choke Line 16.10 •- ', z s;s,. x 3 ~: 2'. `~ Variaf;le Ram 16.66 2.375' Ccmbi ~- TOT 20.04 ~ Tree Size ~~ Flow 1 22.68 ~ p 24.86 --=~ Master Valve Lock Down Screws Ground Level 7 1116" 5000 psl (RX-46) ~- 7 1116" X 3 1/B" FI angel Adapter Swab Valve SSV T ,Alaska Department of Natural Resources Land Administration System Page 1 of~ ~ i ~_ ., ~ ' =~sk7 ~~-ta~~~t;~ _+-~~ '.. ~o~ ~,.,~~.i~ I I its F:ecordEr's ~earcla State Cabins ~1~#u~1 R~3D4~1°~S ~~ Alaska DNR Case Summary File Type: ADL._.., __ File Number: 2$30$ ~ ~ Prin. table Case File_Summary See Township, Range, Section and Acreage? C' Yes ~"' No New Search .AS Menu I Case Abstract I Case Detail I Land Abstract .., File: :~DL ?8308 '°~~'`~' Search for Status Plat Updates Customer: 000107377 BP EXPLOR~~110\ (AL~~SKA) INC PO BOX 196612/900E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL ANDGAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED 1I~°ridio~r ~ U 1 ~nvnship: ll I l N R~rrrge: 014E Sc ctror~: ? i SectionAcres: Ei4f1 Search flats a1~~i~~clurir: U 7uivnship: OI I N Range: 0 I ~[, S'cc~t~un: ,6 S~~c~ion Acres: 640 alrrrclrcnr. l' 7uiwnship: OLIN Ran,~,~~~: U14E ,S'~>clir~rt: ?5 <~'trlronAcres: 644 ~1lc~rrdia~~: U Trnvnslaip: O1 1 N Ran~~: 0 ] 4F. S~ rtion: i (i ,~'c~ctrun : l crc~s: 640 Le;;al Description 0~-28-1965 *"*SALE NOTICE LEGAL DESCRIPTION* C1~-12911N14EUM2~,26,35,362S60.OOU-3-7 ~1CIC~ ~ ~35~ ~Lti3'tlll"' Last updated on 04/0212008. http://www. dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28308&... 4/2/2008 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~/~L/ Oo? - 3qA PTD# ~O~oS00 Development Service Exploratory Stratigraphic Test Non-Conventional Well O ~ FIELD: •®~'~D,~O~" ~,y /-/~ POOL: /~.~~o,D~E°' /~,~y ~OL Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throw h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Comuany Name) must contact the Commission to obtain advance approval of Such water we!! testing ro ram. Rev: 1 / 11/2008 WELL PERMIT CHECKLIST Fiekt & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT 02-39A Program DEV Well bore sag PTD#:2080500 Company BP EXPLORATION (ALASKF~ INC Initial ClasslType DEV 1 PEND GeaArea 890 Unit 11650 On1OH Shore ~_ Annular Disposal ^ Administration 1 Petmitfeeattached --- --- -- -- - - --- -- -- ~ - - -- - --- - --- ------- -- -- -- -- --- 2 lsasenumbarepproRt7ate -------- --- --- - -- -- --- -- Yes -- - -- -- - -- -- -- --- - - --- -- - - - -- ----- 3 Un~ueweil_rtemeandnumber--- -- -- - -- --- --- Yes -- --- - - -- -- --- -- --- - - -- -- - --- -- 4 WalUQCatedin-adefinadp9ol____---------------_-----------_---_ Yes_ ______Prudhoe6ay Field-PCudhoeBayP9ol__-__-_____--__------.------------------- -- 5 1Nalll2catedptc~ardistanr~ef[cmdriltingunitboundary---------------------- Yes- -------------------------- -- -- -- -- - - - -- ------ 6 Wall locatedptapardistanpafromptharwells--------------------------- Yes- --------------------------------- --------------------- ---- ----- --- 7 SuffipientapreageayailableindlillNrgunit_------------------------- --- Yes_ ------2560 Acres------------------------------- -- - -- -- - 8 if deviated,ls vYellbprB piat_includQd - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Operatorpniyaffeptedpartp_-_-__---_--_------------- -- -- Yes- --- -- --- - - -------- -- - ------ - - - -- -- 10 Operatotbas_appropriatebondlnfprpa__-_---__-_----------------- Yes- -----Blanketl3ondiy6194193-__-__-_--__--_--._--_----------------- ------- 11 Petmiicanbsiasue~twitboutconsaruationordar---------------------------- Yes- ----------------------------------- -- - -- -- - - --- - Appr Date 12 Petmitcanbeissuedwithputadministrative_approval__--__.-___-----_---_-- Yes- -------------------------------- -- -- --- -- -- - -- -- -- 13 Canpermitbeapprovadbaforel5-dayWait----„------------------------ Yes- ------------------------------ --- ---- --- - --- --- -- -- ACS 4!1612008 14 Wap lpcaked wtthin area artd_straiaAUthRr[zad by lnjaCtion Ctdet# (putlC# in_comments)_(FQr. NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 All wells-~rittunll4_mileataa_oftev~widentifisd(FotseNicewell9n~C)--------------- NA-- -------------------------------------- --- - - -- - -- -- --- 16 PIa•produced inJe~or duration ofpre-pto~uction less than 3 months_(For_ssrvice v~ell only) _ . NA_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 _Nonconvan,gas-cpnfprnts ip AS31,05.0304t•A)~(1.2.A•©) - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Englneering 18 Conductorst[ing-prpvided_---_--__--_---_---------------- --- - NA-- ------Cprtduptprsetin DS 02.39(198.182)•----------------------------- -- -- -- 19 SudececasingprptectsaliknpwrtUSRWs_--_----_------------------- ~A-- ------No aquifers,A1O4Bconplusipn-5,._.__--__-__-_-------------------------- - 20 CMTvolad~quat~_tocircutateon_ccnd~ct9r&surf-csg--------------------___ NA-- ------Surfar~casingsatirt02.39,_--_---_._-_--_----_-_--------------------------- 21 CMT_voladequate_tptie•inlongsUingtosurfcsg--_-_.--_.-.--------____ NA. - _---Production-casingsei in 02-39.-_--__--___------------------ - --- - - 22 CMT willcovecallknawnproductiveborizpns--_---_-------_------------ Yes- ------------------------------ -- -- --- -- -- -- -- - -- -- 23 Casing das~ns adequate for G. T, i3 &-permafrust- - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 .Rdequake iankage_or reserve pit - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - Yes - _ - _ _ Rig equipped with steel pits, No reserve pit planned.- All waste_to approved disposal well(s). - - _ - _ _ - - - _ - 25 Ifa_reed[ilGbaa_a10.403iorabandpnmentbeenapP-rQVed---------------------- Yes- ------308,101----------------------------------------- -- --- - -- 26 Adequate-wehbora separation.ptoppsed - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - _ - _ Proximity! analysis parf_otmad, Nearest segment is P$A portion of 02.39L1 and paths diverge: _ _ , . _ - - _ _ - - - 27 If divertarraquUad,dr?asitmeelregulations------------------------------- NA-- ------SQPstackwiltalready_beinplace,------------------------,--------------- - - Appr Date 28 Drilling flukl_ program schemetic_&aquip list adequate- - - - - - - - - - - - - - - - - - - - - - Yes - _ - - Maximum expected fo[matipn pressure 7,1-EMW, Planned MW 8.6ppg- _ _ - - _ _ _ - - - _ - - - - - _ _ - TEM 4116!2008 29 BOPls~dotheymeetregulation- ---- -- --- -- -- - -- -- Yes - --- ---- --- - - -- -- ----- -- - - -- -- - ~~'~ 30 BOPS-press rating appropriate; last to_(qut psig in comments)- - - - - - - - - - - - - - - - - Yes - _ - - - _ MA$P palEUlafed at 2377psi, 3500 psi BOP testplanned. _ _ _ _ _ _ _ - _ _ _ - - _ - _ _ . - _ _ - _ - _ - _ - - . _ - - 31 Chgke_manifpldppmplieswlAPl_RP•53~May$4)-__---__-----_.--------- Yes- ------ ----- 32 Wrzrk wih Occur with9ut oparatton shutdown- - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of H2S gas probable - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - _ Yes - - - - - - H2$ is repprtad_at DS 9, Mud should_preclude H2$ pn rig. Riq has sensors and alarms, - _ _ _ - _ _ - 34 Mechanicalconditlonotu+flllswithinA4Rvanfed{PCrservicewell poly)-------------- NA-- --------------------------- -- -- -- - - - ----- - - -- - Geology 35 Petmitcanbeissuedw/ohydrogertsulfidemeasutee------------------------- Na_ _____Maxievelort DS 02 is 100ppmonwe1102.29A.------------------------------------ 36 Data-prassntedonpotantialpvarpressurezprtes-- ----- -- -- - --- - ~A- - ---- - -- -- --- --- --- --- --- - -- --- ---- - - -- --- Appr Date 37 Seismic analysts pf shallow gas_zones- - - - - - - - - - - - - - - - - - - ?'lA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 4116!2008 38 Seabedcpnditionsunrey.(ifpff.•shofa)--------------------------------- ~-- --- -- - - -- --- -- ----- -- -- --- -- 39 Coptactnamelphoneforweekly_Rrograssrepprts[exploratorypnly]----------------- Yes- ------GregSarber--264-4330-------------------------------------------- -- --- Geologic Engineering Public Date Date Commissioner om i er: Date• Co issioner: ((// ~~~~~~~ r ~~ 8B / ' ~~'~!J