Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-149r 'ect Well Histo File Cover'Page Image P o~ rY XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ _ ~ (~ 9' Well History File Identifier Organizing (done) RESCAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: ^ Two-sided III IIIIIIIIIII IIII DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: ^ Rescan Needed III II'I') II II III III OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: NOTES: ^ Other:: gY; Maria Date: ~O /s/ IIIIIIIIIIIIII (IIII Project Proofing BY: Maria Date: ~ ~ /s/ - + =TOTAL PAGES ~ y Scanning Preparation _~ x 30 - (Count does not include cover sheet) gY; Maria Date: /s/ III IIIIIIIIIII II III Prnt~luctien SCann/nq Stage 1 Page Count from Scanned File: --_~~ (Count does include cover heet) Page Count Matches Number in Scanning Pr paration: YES NO gY; Maria Date: ~ ~ D /sl ~~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO gY; Maria Date: /s/ ' unless rescannin is required. III II') II I II II (IIII Scanning is complete at this point 9 anned IIIIIIIIIIIIII (IIII ReSc BY: Maria Date: !s/ ile: Quality Checked III IIIIIIIIIII~I III Comments about this f 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA ' '~ ALASKA IL AND GAS CONSERVATION COMMISSIDIV REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ^ Pertormed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re-e ter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: Permit to Drill Number: Name: Development ^~ Exploratory 208-1490 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-22563-01-00 ' 8. Property Designation (Lease Number) : ~ ~ 9. Well Name and Number ADLO-028304 \ PBU E-36A 10. Field/Pool(s): \ PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: ~~,QQ s (measured) 10670' 7/8/09~1~'41~~~ ~ s~ Cam' C th measured 11861 feet Plu T t l D g o a ep true vertical 9061.92 feet Junk (measured) None feet A!~6h~1'~~ Effective Depth measured 11822 feet Packer (measured) 8914 true vertical 9060.04 feet (true vertical) 8535 Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" 91.5# H-40 SURFACE - 110 SURFACE - 110 1490 470 Surface 3648 10-3/4" 45.5# NT-80 35 - 3648 35 - 3938 5210 2480 Intermediate 9229 7-5/8" 29.7# L-80 36 - 9229 36 - 8785 6890 4790 Production Liner 2978 3-/12X3-3/16X2-7/8 8883 - 11861 8508 - 9062 Liner 9.2#/6.2#/6.16# L-80 Pertoration depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ - Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 SURFACE - 8960 SURFACE - 8575 Packers and SSSV (type, measured and true vertical depth) 7-5/8"4-1/2" BKR S3 PKR 8914 8535 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 670 47166 95 1148 Subsequent to operation: 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ~ Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 2/25/2010 lion I Form 10-404 Revised 7/2009 ~~w„~ f,~p p ~ !~ ~ ~ ~, ~. ~n ~itOrig~a~~y ~ry1 I~R `-ram- 3 r E-36A 208-149 oror ATTA~`uIIAGIJT Sw Name Operation Date Perf Operation Code ~Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base E-36A 1/17/09 PER 10,750. 11,050. 9,065.53 9,066.72 E-36A 1/17/09 PER 11,200. 11,500. 9,061.92 9,062.47 E-36A 1/17/09 PER 11,600. 11,800. 9,061.94 9,058.96 E-36A 7/10/09 BPS 11,797. 11,800. 9,058.81 9,058.96 E-36A 2/18110 APF 10,290. 10,315. 9,052.39 9,055.22 E-36A 2/18/10 APF 10,315. 10,340. 9,055.22 9,058.28 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ ~ E-36A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY i 2/17/2090 CTU #9. 1.75" OD CT Job Scope: Perforate «< Interact publishing »> ' MIRU, Safety Audit .Perform weekly BOP test. RIH w/ 2.24" JSN drift assy, Tag HES FasDril plug @ 10664' CTM, correct depth to 10,669'. Flag pipe and POH. MU Sch Perf guns. RIH. Tam fasdrill @ 10,669' CTM. Correct to bottom shot. - 10,668.3'. PUH to 10,340' -bottom shot. Continued on WSR 02/18/2009. 2/18/2010' w,®~® CTU #9 w/1.75" OD CT. Job scope -Perforate «< InterACT publishing »> Continued from WSR 02/17/2009. PJ2006 HMX pert gun 2" x 25', 6spf 60 deg phase guns Perforate from 10.315' - 10,340'. POOH. Confirm holes, recovered ball. MU Sch gun run #2. RIH. Perforate from 10,290' - 10.315'.. POOH. LD Guns all fired and recovered ball. RD MOL **'""**Job Complete""*"*" FLUIDS PUMPED BBLS 170 Meth/water 2 DIESEL 172 Total TREE = CMJ WELt~ EA1J = • FMC FtCTUATOR = BAKER C KB. ELEV = 63.4' BF. ELEV = 34.4' KOP = 1050' Max Angle = 94° @ 10758' Datum MD = 9343' Datum TV D = 8800' SS 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" Minimum ID = 2.30" @ 8892' BTT AL PROFILE 3-1/2" LNR, 9.2#, L-80 STL, $933' .0087 bpf, ID = 2.992" 4-112" TBG, 12.6#, L-80 NSCT, I $960' .0152 bpf, ID = 3.958" I 9180' I ~TOPOFWHIPSTOCK ~ 9224' RA TAG 9234' 7-518" CSG, 29.7#, L-80 NSCG 982T .0459 bpf, ID = 6.875" TD -~ 9850' E-36A 2197' 1-14-112" OTIS HXO SSSVN, ID = 3.813" CAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 2 1 4830 6265 4812 6174 12 23 GA CA DOME SO BK BK 16 20 01/29/09 01/29109 $$$3' 3-112" BKR DEPLOYMENT SLV, ID = 3.00" 8$92' BTT AL PROFILE MILLED OUT TO 2.30" B HIND "-- $902' N 4-1/2" HES X NIP, ID= 3.813" R $914' 7-518" x 4-1/2" BKR S3 PKR, ID = 3.875" $933' 3-1/2" X 3-3/16" XO, ID = 2.786" - $937' 4-112" HES X NIP, ID = 3.813" _,,,,_,,,,.,,,.,.,,.,_,,,,,,,,,,,,,,,, $94g' ~ .._ B E H I N D 4-1/2" HES XN NIP, ID = 3.80" LNR MILLED (12119/08) _-~~~~-8960' - 4-1/2" WLEG, ID = 3.958' 8955' ELMD TT LOGGED 10/04/95 MILLOUT WINDOW (E-36A} 9230' - 9238' ? 10485' 3-3/16" X 2-7/8" X0, ID = 2.370" /o3r5- 10670 2-7/8" HES FASDRILL /0 3Yo / ~s~~ (07108/09) 3-3/16" LNR, 6.2#, L-80 TCII, .0076 bpf, ID = 2.80" I-i 10485' PERFORATION SUMMARY REF LOG: BHI MWD/GRJROP/RES 01/14!09 ANGLE AT TOP PERF: 94° @ 10750' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2 6 10750 - 11050 C 01!17!09 2 6 11200 - 11500 C 01/17/09 2 6 11600 - 11800 C 01/17/09 PBTD --L 11 2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" -r DATE REV BY COMMENTS DATE REV BY COMMENTS 07/05/95 ORIGINAL COMPLETION 11/18!09 CR/JMD DRLG DRAFT CORRECTIONS 01!17/09 NORDIC 1 CTD SIDETRACK {E-36A) 01/24/09 /TLH CORRECTIONS 02/05/09 GJF/SV GLV C/O (01/29109) 03/18/09 DAViSV CORRECTIONS 07126!09 JD/PJC FASDRILL SET (07111!08} PRUDHOE BAY UNIT WELL: E-36A PERMIT No: ~L08149 API No: 50-029-22563-01-00 SEC 6, T11 N, R14E, 1706' FNL & 882' FEL BP Exploration {Alaska) DATA SUBMITTAL COMPLIANCE REPORT 2/2412010 Permit to Drill 2081490 Well Name/No. PRUDHOE BAY UNIT E-36A Operator BP EXPLORATION (ALASKAa INC API No. 50-029-22563-01-00 MD 11861 TVD 9062 Completion Date 1/17/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud log No Samples No Directional Surve Yes T DATA INFORMATDN Types Electric or Other Logs Run: MWD DIR / RES / GR, MCNL / GR /CCL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log! Electr Data Digital Dataset Log Log Run Interval OH / type; meairrmt numoer Name acme mea~a no start slop ~n rcecervea ~.ommenis pt LIS Verification 9040 11861 Open 4/6/2009 LIS Veri, GR, ROP, RAD, I ~~ RAS, RPD, RPS D C Lis 17785/Induction/Resistivity 9040 11861 Open 4/6/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS og Induction/Resistivity 5 Col 9224 11861 Open 4/6/2009 TVD MPR, GR 14-Jan-2009 og Induction/Resistivity 25 Col 9224 11861 Open 4/6/2009 MD MPR, GR 14-Jan-2009 og Gamma Ray 25 Col 9224 11861 Open 4/6/2009 MD GR 14-Jan-2009 D C Lis 17846!/Induction/Resistivity 8799 11836 Open 4/14/2009 lis Veri, GR, CNT, SDN, DIL I ~ og Neutron 5 Blu 8799 11829 Open 4/14/2009 Multi Express (IFLEX) CNL, PCMS, Litho Dens, Dual Induction 14-Jan-2009 Log Neutron 5 Blu 8709 11788 Case 6/11/2009 MCNL, STP, Spin, Temp, Pres, TNN, TNF, GR, CCL 18-May-2009 D C Pds 18149 ~Meutron 8709 11788 Case 6/11/2009 MCNL, STP, Spin, Temp, Pres, TNN, TNF, GR, CCL 18-May-2009 L~ C Lis _ 18418 ~leutron __ 8793 11796 Case 8/10/2009 LIS Veri, GR, CNT Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments • •I DATA SUBMITTAL COMPLIANCE REPORT 2/24/2010 Permit to Drill 2081490 Well Name/No. PRUDHOE BAY UNIT E-36A Operator BP EXPLORATION (ALASFC~ INC MD 11861 ND 9062 Completion Date 1/17/2009 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-22563-01-00 UIC N ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? (~ N Chips Received? a(^titl-" Formation Tops ~N Analysis Received? Comments: Compliance Reviewed By: ___ Date: ~ ~ l ~- ~ ~ ~~ • 07/27/09 ~~~~ N0.5324 E~laska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken A x 7rt1: tisth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD ~~ E-36A B1JJ-00018 MCNL - / 05/18/09 1 ___~_ L2-28 BOCV-00018 RST b - ~ 06/19/09 1 1 _ ____ 12-01 AYTU-00039 RST I L. 06/02/09 1 1 _...__..~_ R-27 AYOO-00034 RST (p _ .06/17/09 1 1 F-45B 62NJ-00007 MCNL -- 06/08/09 1 1 __ 02-33A AYTU-00033 CH EDIT PDC USIT 05/19/09 1 1 __ 18-29B AXED-00023 CH EDIT PDC JEWELRY LOG G 05/06/09 1 r~~ G-16A B2NJ-00010 MCNL ~ 06/18/09 1 1 L3-OS AYTU-00042 RST -- 06/07/09 1 1 _T Z-016 AXBD-00003 MCNL 11/26/09 1 1 _ A-04 B6NK-00001 RST 07/07/09 1 1 ne cwc~r_ wi.vui..n.e ~...... ..~ ...-...~.... .....-.. .._ -.._ ___..___._._ BP Exploration (Alaska) Inc. ~ ~yv~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. . .+. .....e.....a ruw ree_. vnnn~aa VI\C l.Vf 1 cr~a,n ~ v: Alaska Data & Consulting'Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 06/08/09 • ~~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description N0.5271 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD H-35 AYTO-00018 CROSS FLOW CHECK j 05/09/09 1 1 14-35 ANHY-00087 INJECTION PROFILE ~ - 05/15/09 1 1 06-08A AViH-00012 IBP/FBS/CFS/GRADIO/PRESS/T P 05/11/09 1 1 A-44 AWLS-00017 SCMT 05/25/09 1 1 12-07A BOCV-00016 SBHP SURVEY 05/19/09 1 1 09-24 ANHY-00088 CROSS FLOW CHECK/IBP ~ - 05/17/09 1 1 H-29A AYOO-00027 PPROF/RST - 05/19/09 1 1 09-09 AYTU-00032 CROSS FLOW CHECK , 05/06/09 1 1 15-45B ANHY-00010 PRODUCTION PROFILE '~~ 05/09/09 1 1 13-13A AYTU-00033 USIT - ~ i' ~ 05/08/09 1 1 M-19B AY3J-00024 PRODUCTION PROFILE 05/14/09 1 1 Z-12 ANHY-00084 INJECTION PROFILE 05/07/09 1 1 E-36A B1JJ-00018 MEM CNUSTP ~ P 05/18/09 1 1 X-30A 62WY-00005 C MEM PROD PROFILE 05/10/09 1 1 12-23 AYKP-00021 USIT L - 05/08/09 1 1 W-34A AWJI-00031 MEM PROD PROFILE - 05/19/09 1 1 Z-14B AZCM-00022 PROD PROFILE/JEWELRY LOG ~ (o- 05/20/09 1 1 Li-21 62NJ-00006 PRODUCTION PROFILE 05/24/09 1 1 A-31A AZCM-00023 USIT Z(~ - Q {o G 05/22/09 1 1 H-19B' 62WY-00004 MEM PROD PROFILE e- 05/07/09 1 1 G-16 AYKP-00022 SCMT f / - 05/09/09 1 1 M-19B AY3J-00024 SCMT - 05/15/09 1 1 12-37 AWL9-00032 PRODUCTION PROFILE _ C,/G/ ~ 04/21/09 1 1 11-04A AYOO-00028 USIT f ~/.- 05/21/09 1 1 18-30 B1JJ-00015 MEM PROD PROFILE JG/ 05/13/09 1 1 4-14A/S-37 AYKP-00024 PRODUCTION PROFILE ~ - ~ i 05/11/09 1 1 3-37/L-35 AWL9-00035 PROD/INJECTION PROFILE 05/22/09 1 1 3-37/L-35 AWL9-00035 TEMPERATURE SURVEY 05/20/09 1 1 V-217 AYOO-00024 INJ PROFILE/RST WFL t3 ~ /$(5 04/26/09 1 1 F'LtASt AI:KIVUWLtUIat hi tl:tlt'I CT JIla1VIlVla AIVU titl UFiIV11Vla Vnlt I:VYT tAVrl I V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 04/14/09 S~h~nbe~g~~ N0.5186 ~~e~~ JOD # Lo Descri lion Date BL Color CD MPS-43 AZCM-00001 OH LDWG EDIT _ 12/29/08 1 1 E-36A AYTU-00006 OH LDWG EDIT (IFLEX) 01/14/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~r BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Bivd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 ATTN: Beth /~ Received by: ~"~A n U ~® BAKER F~Y~sNE3r CUMYANY BY EXYLURA'1'lUN WELL NAME E-36A Saker Atlas PRINT DISTRIBUTION LIST LASKA) INC CUUN 1'Y NUKl'H SLUYI BUKUUGH STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 3/26/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #:2367724 Copies of Copies Digital Copics oC Copies Digitzl Ezch Log of Film Data Ezch Log of Film Dzta 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE AK 99508 ANCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 i Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SU[TE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List Completed Bv: ~. ~~~-/~~ Page 1 of 1 INTE IJ® ata Trans ittal F®r To: State of Alaska -A®GCC 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: E-36A Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) ;; 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2367724 Sent by: Catrina Guidry Date: 03/26Nty - Received by: ate: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ ~;. ? ,~~ ~_ 7260 Homer Drive ~~~ Anchorage, Alaska 99518 Direct: (907) 267-6612 1NTEt~ FAX: (907) 267-6623 STATE OF ALASKA RE~I~'i~~ ~~ ALASK~IL AND GAS CONSERVATION COM~SION ~` WELL COMPLETION OR RECOMPLETION REPORT AND LOG FEB ~ ~ 1Cl~s Alaska tlil ~ r:~~ r,..._ ,~ . 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoa-c zs.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Clash i~ ®Developrr~~ii~f"~ Exploratory ^ Service ^ Strati raphic 2. Operator Name: BP Ex loration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 1/17/2009 12. Permit to Drill Number 208-149 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 1/6/2009 13. API Number 50-029-22563-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 1/14/2009 14. Well Name and Number: PBU E-36A 1706 FNL, 882 FEL, SEC. 06, T11N, R14E, UM Top of Productive Horizon: 136' FSL, 2425' FEL, SEC. 31, T12N, R14E, UM 8. KB (ft above MSL): 64.1' Ground (ft MSL): 28.9' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 845' FSL, 974' FEL, SEC. 31, T12N, R14E, UM 9. Plug Back Depth (MD+TVD) 11822' 9060' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 664102 y- 5975350 Zone- ASP4 10. Total Depth (MD+TVD) 11861' 9062' 16. Property Designation: ADL 028304 & 028299 TPI: x- 662512 y_ 5977158 Zone- ASP4 - 5977898 Zone- ASP4 Total De th: x- 663945 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: p y 18. Directional Survey ®Yes ^ No i n r 2 19. Water depth, if offshore NIA ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 C 25.071): MWD DIR / RES / GR, MCNL / GR / CCL ~/NOO.~./ ~ ~~~~~~U ~ ~8/. S ~TYIS 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " 1. 11 x r .. " " ~ -7 1 ' .3-'1/z~~713-3/'I ~~XZ-7/8~~ 9.~~8.~~8.~~ I 1 1 I 1 -1/ " I 1 23. Open to production or inject ion? ®Yes ^ No 24. Tue1NG RECORD If Yes, list each i (MD+TVD of To 8 Bottom Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD ; p 2" Gun Diameter 6 spf 4-1/2", 12.6#, L-80 8960' 8914' , MD TVD MD TVD 10750' - 11050' 9066' -9067 11200' - 11500' 9062' -9062' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11600' - 11800' 9062' -9059' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 2000' Freeze Proteced with 20 Bbls McOH 26. PRODUCTION TEST Date First Production: February 7, 2009 Method of Operation (Flowing, Gas Lift, etc.): Flowin Date Of Test: 2/g/2009 HOUrS Tested: 4 PRODUCTION FOR TEST PERIOD OIL-BBL: 202 GAS-MCF: 4,893 WATER-BBL: 267 CHOKE SIZE: 96 GAS-OIL RATIO: 24,194 Flow Tubing Press. 950 Casing Press: 1,500 CALCULATED 24HOUR RATE• OIL-BBL: 1,213 GAS-MCF: 29,358 WATER-BBL: 1,600 OIL GRAVITr-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ® No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. u., .. _~:iilli~ None .. _ ~~ Form 10-407 Revised 02/2007 ~ « ;OONTINUEO ON REVERSE SIDE ~ ~~ ~ ~ ~ . ~~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN RS ENCOUNTERED): 29. FORMATION TESTS ` NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Top CGL 9317' 8847' None Base CGL 9412' 8902' 23S6 /Zone 28 9552' 8950' 22TS 9798' 9006' Formation at Total Depth (Name): 22TS 9798' 9006' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. O~ ~ t `/ Title Drilling Technologist Date Signed Terrie Hubble PBU E-38A 208-149 P-epared By Name/NumNer. Terrie Hubble, 564-4828 Well Number p / A r v I N Drilling Engineer: Charles Reynolds, 564-5480 INSTRUCTIONS GeNeRa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~ From - To ~ Hours ~ Task Code NPT ~ -- __ ,1/4/2009 100:00 - 11:30 11.501 MOB P 19:00 - 00:00 5.00 OPSUR P Spud Date: 6/12/1995 Start: 12/17/2008 End: 1 /17/2009 Rig Release: 1 /17/2009 Rig Number: Phase II Description of Operations PRE PRE PRE 1/5/2009 00:00 - 00:45 0.75 BOPSU P PRE 00:45 - 02:25 1.67 RIGU P PRE 02:25 - 03:00 0.58 BOPSU P PRE 03:00 - 06:00 3.00 WHIP P WEXIT 06:00 - 08:00 2.00 WHIP P WEXIT 08:00 - 08:40 0.67 WHIP P WEXIT 08:40 - 11:15 2.58 WHIP P WEXIT 11:15 - 11:45 0.50 WHIP P WEXIT 11:45-12:15 0.50 WHIP P WEXIT 12:15 - 13:00 0.75 WHIP P WEXIT 13:00 - 13:20 0.33 WHIP P WEXIT 13:20-15:30 2.17 WHIP P WEXIT 15:30 - 16:15 0.75 ZONISO P WEXIT 16:15 - 18:00 1.75 ZONISO P WEXIT 18:00 - 20:30 2.50 ZONISO P WEXIT 20:30 - 20:45 0.25 ZONISO P WEXIT 20:45 - 23:05 2.33 ZONISO P WEXIT 23:05 - 00:00 I 0.921 ZONISO I P 1/6/2009 100:00 - 01:20 I 1.331 ZONISO I P Move to E-36. Spot rig on over well. ACCEPT RIG AT 11:30 HOURS NU BOP, load pits w/ 2% double slick KCL BOPE test BOP witness waived by Chuck Scheeve Finish ROPE TEST RU Lubricator, Pull BPV (5 psi below the BPV), RD Lubricator PT and chart Inner Reel Valve Fill coil w/ water, Pump slack back, Cut 345' coil, MU CTC, rehead eline, pump slack forward. Bull head freeze protection to formation 3.3bpm ~ 3300 psi. MU whip stock BHA with 2 RA tags. RIH without returns Circualting 2bpm reduce to .75 bpm. Log tie -in. Correction - 1'. RIH on returns . UP WT 37K. Set top WS .Close EDC. Bring pumps up, WS set at 2850 psi, TOWS 9,224', tag WS, PU and check weight, good set PU above WS and pump high vis pill. No returns to surface. Wait on fluid. Monitor MWD annular pressure Lost 100 psi in 20 min. + loss of 7 bbl hour static. POH filling + loss rate. Flow check. While filling across to top of hole, LD WS running tools. MU nozzel. RIH to WS. Wait on fluids. SAFETY MEETING re: pumping cement Prime up cement unit PT lines to 4000 psi, Zero In MM, Nozzle depth at he WS Pump 32.8 bbls 15.8 ppg Class G Cement on the fly. No returns. Shut down to clean out cement lines. Pump 2% KCL w/ 2ppb Biozan. No returns Cement at nozzle ~ 50.1 bbl IN, Close choke ~ 52.8 bbl IN Bullhead 30 bbls POH 45 fpm, 2.40 bpm ~ 81.5 bbl IN Open choke; fluid back to surface. PUH to 8608 ft, pumping 2.00 bpm w/ 1 for 1 returns. Down on the pumps, all pressure to zero, close choke & zero IN MM. Pump 1.7 bbl, Shut in Pressure = 688 psi; lost 142 psi in 10 min Pump 0.5 bbl, Shut in Pressure = 1483 psi; lost 143 psi in 5 min Pump 0.4 bbl, Shut in Pressure = 1945 psi; lost 75 psi in 2 min Open up the choke, bleed off pressure Wash down to TOWS WEXIT POH displacing well to 2% KCL & 2ppb Biozan Paint flag at 9090' coil depth (9077' EOP) WEXIT POH displacing to milling fluid. Cement in returns. Printed: 2/9/2009 2:00:27 PM 1 ~`~ BP EXPLORATION Page 2 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code' NPT ' Phase Description of Operations 1/6/2009 01:10 - 01:20 0.17 ZONISO P WEXIT Standback injector, UD cement nozzle 01:20 - 01:50 0.50 BOPSU P WEXIT PU swizzle stick, stab injector, jet BOP stack 01:50 - 03:10 1.33 BOPSU P WEXIT Secure the well, Open BOP ram doors to check for cement, close doors. BOP body test to 3500 psi is good. 03:10 - 04:00 0.83 STWHIP P WEXIT PU window milling BHA. 04:00 - 05:35 1.58 STWHIP P WEXIT RIH with window milling BHA 05:35 - 06:00 0.42 STWHIP P WEXIT Log tie-in. Correction +5' 06:00 - 12:00 6.0 XI ime mi win ow. Milling at 2200 psi, 2155 psi FS, 2.5/2.5 bpm, 1.65K WOB, 9834.4' 12:00 - 16:00 4.00 STWHIP P WEXIT Continue time milling window 2290 psi, 2155 psi FS, 2.6/2.62, 2.71K WOB, 9235' 2380 psi, 2155 psi FS, 2.6/2.62, 2.39K WOB, 9236' 2380 psi, 2155 psi FS, 2.6/2.63, 1.5K WOB, 9237' Bottom of window at 9237'- Time mill to 9238' at 1 FPH. 16:00 - 17:15 1.25 STWHIP P WEXIT Mill 10' of formation to 9247'. 2.6 bpm, 2200 fs, 3-4K wob, 15 fph Swapped to new FloPro. Back ream window three times, dry drift, window clean 17:10 - 18:30 1.33 STWHIP P WEXIT POOH with 3.80" milling BHA. circ at 2.4 bpm, 2600 psi. 18:30 - 18:40 0.17 STWHIP P WEXIT SAFETY MEETING discussing UD BHA procedures, hazards, & mitigations. 18:40 - 20:00 1.33 STWHIP P WEXIT UD window millin BHA. Mill is 3.79" Go, 3.78" No Go. Surface test BHI tools. PU Build BHA 20:00 - 21:25 1.42 DRILL P PROD1 RIH Build BHA #4 w/ 1.6 d Mtr & HYC BC Bit 21:25 - 22:30 1.08 DRILL P PROD1 Log tie-in. Correction +6. Log to window. 22:30 - 23:45 1.25 DRILL P PRODi Drill from 9247.8' at 2.51/2.51 bpm ~ 2900 psi, 2800 psi FS 0.86k-1.36k# DHWOB, 43 fph, 9.78 ECD IA = 0, OA = 0, PVT = 335 Drill to 9293.3'. 23:45 - 00:00 0.25 DRILL N DFAL PROD1 POH for HOT failure. 1/7/2009 00:00 - 01:00 1.00 DRILL N DFAL PROD1 POH for HOT failure. 01:00 - 03:20 2.33 DRILL N DFAL PROD1 SAFETY MEETING re: UD BHA #4 UD BHA #4 PU new HOT, PU BHA #5 03:20 - 05:00 1.67 DRILL N DFAL PROD1 RIH Build BHA #5 w/ new HOT. 05:00 - 05:40 0.67 DRILL N DFAL PROD1 Log Tie-In. Correction +4'. 05:40 - 06:00 0.33 DRILL P PROD1 Drill from 9292' at 2.51/2.50 bpm C~3 2820 psi, 2680 psi FS 0.36k# DHWOB, 70 fph, 9.75 ECD IA=O, OA=O, PVT=330 06:00 - 07:30 1.50 DRILL P PROD1 Drill Zone 3 build section, 2.6 bpm, 2750 fs, 2800-3200 psi, 30L TF, 49 deg incl, 9.8 ecd, 40 fph, Drilled to 9353'. 07:30 - 10:00 2.50 DRILL P PROD1 Drill Zone 3 build section, 2.6 bpm, 2750 fs, 2800-3200 psi, 30L TF, 57 deg incl, 9.8 ecd, 30 fph, Drilled to 9390'. 10:00 - 12:00 2.00 DRILL P PROD1 Drill Zone 3 build section, 2.6 bpm, 2800 fs, 2900-3200 psi, 30L TF, 72 deg incl, 9.8 ecd, 30 fph, Drilled to 9450'. 12:00 - 12:20 0.33 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. Printed: 2/9/2009 2:00:27 PM ~ ~ BP EXPLORATION Page 3 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code ~~ NPT Phase Description of Operations 1/7/2009 12:20 - 15:00 2.67 DRILL P PROD1 Drill Zone 2 build section, 2.6 bpm, 2800 fs, 2900-3200 psi, 30L TF, 75 deg incl, 9.8 ecd, 60 fph, Drilled to 9550'. 15:00 - 16:00 1.00 DRILL P PRODi Drill Zone 2 build section, 2.6 bpm, 2800 fs, 2900-3200 psi, 90R TF, 75 deg incl, 9.8 ecd, 60 fph, Driller to 9600' 16:00 - 16:40 0.67 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom 16:40 - 18:00 1.33 DRILL P PROD1 Drill Zone 2 build section, 2.6 bpm, 2800 fs, 2900-3200 psi, 90R TF, 75 deg incl, 9.8 ecd, 50 fph, Drilled to 9655'. 18:00 - 20:10 2.17 DRILL P PROD1 Drill Zone 2 build section at 2.5/2.5 bpm ~ 2960-3130 psi, 2800 psi FS 70-95R TF, 1.4k-3.7k# DHWOB, 9.87 ECD, 63-95 fph IA = 0, OA = 0, PVT = 314 20:10 - 21:55 1.75 DRILL P PROD1 POOH to surface. 21:55 - 00:00 2.08 DRILL P PROD1 SAFETY MEETING re: BHA change L/D Build BHA #5, Bit graded (6,4, RO, N) MU resistivity tool, Test BHI tools. PU Build BHA #6 1/8/2009 00:00 - 01:30 1.50 DRILL P PROD1 RIH BHA #6 w/ 1.2 de Mtr, USMPR, and new HYC bit. 01:30 - 01:50 0.33 DRILL P PROD1 Log tie-in. Correction -2.5'. 01:50 - 03:10 1.33 DRILL P PROD1 Log at 8 fpm to TD, pumping 2.5 bpm. 03:10 - 04:40 1.50 DRILL N DFAL PROD1 Problems w/ BHI tools, orienter end stops are moving. PUH slowly, then pull up into casing pumping minimum rate while BHI troubleshoots software and contacts town team. 04:40 - 06:00 1.33 DRILL N DFAL PRODi Open EDC then POOH to surface. Orienter is not competent to drill with. 06:00 - 06:15 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing BHA. 06:15 - 07:00 0.75 DRILL N DFAL PROD1 L/O Coiltrak BHA. Bit graded at (0,0,1 ). 07:00 - 11:00 4.00 DRILL N DFAL PRODi Wait on BHI orienter to arrive at rig. 11:00 - 11:30 0.50 DRILL P PRODi Held general safety meeting with crew and discussed traction devices with crew and ensured everyone understood when and where to wear traction devices and or Tanner boots. 11:30 - 17:45 6.25 DRILL N DFAL PROD1 Wait on orienter to arrive from Anchorage. 17:45 - 20:20 2.58 DRILL N DFAL PRODi M/U CoilTrak /RES BHA, Test at surface. 20:20 - 21:40 1.33 DRILL N DFAL PROD1 PU BHA # 7 w/ new orienter. 21:40 - 23:15 1.58 DRILL N DFAL PROD1 RIH BHA #7 w/ CoilTrak, RES, and HYC bit. 23:15 - 23:35 0.33 DRILL N DFAL PROD1 Log tie-in. Correction -3'. 23:35 - 00:00 0.42 DRILL N DFAL PROD1 RIH. 1/9/2009 00:00 - 00:05 0.08 DRILL N DFAL PROD1 RIH 00:05 - 00:55 0.83 DRILL P PROD1 Drill Zone 2 build section from 9,752' 2.64/2.64 bpm ~ 2870 psi, 2800 psi FS, 90-100 TF 1.7k-2.9k# DHWOB, 25 fph, 9.9 ECD IA = 0, OA = 433, PVT = 325 Drill to 9765'. 00:55 - 04:05 3.17 DRILL P PROD1 Drill Zone 2 build section from 9,765' 2.4/2.4 bpm ~ 3000 psi, 2720 psi FS, 95-85 TF 1.9-4.5k# DHWOB, 0-10 fph, 9.9 ECD IA = 0, OA = 430, PVT = 301 Drill to 9785'. 04:05 - 06:00 1.92 DRILL P PRODi Drill Zone 2 build section from 9,785' Printed: 2/9/2009 2:0027 PM • BP EXPLORATION Page 4 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code' NPT ~', Phase Description of Operations 1/9/2009 04:05 - 06:00 1.92 DRILL P PROD1 2.5/2.5 bpm ~ 2800 psi, 2700 psi FS, 85 TF 0.7k-1.4k# DHWOB, 10-23 fph, 9.9 ECD IA = 0, OA = 470, PVT = 314 Drill to 9798'. 06:00 - 08:30 2.50 DRILL P PROD1 Drill Z2B build, 2.5 bpm, 2700 psi FS, 2800-3400 psi, 70R, 82 deg incl, 60 fph. Drilled to 9906'. 08:30 - 09:30 1.00 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 09:30 - 11:30 2.00 DRILL P PROD1 Drill Z26 build, 2.5 bpm, 2750 psi FS, 2800-3400 psi, 70R, 83 deg incl, 30-40 fph. 9.9 ECD, Drilled to 9995'. 11:30 - 13:30 2.00 DRILL P PROD1 Drill Z26 build, 2.5 bpm, 2750 psi FS, 2800-3400 psi, 90R, 85 deg incl, 30 fph. 9.9 ECD, Drilled to 10050' 13:30 - 14:10 0.67 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 14:10 - 15:30 1.33 DRILL P PROD1 Drill Z26 build, 2,5 bpm, 2800 psi FS, 2800-3400 psi, 90R, 86 deg incl, 20 fph. 10.0 ECD, Stacking wt, slow ROP. Drilled to 10,078'. 15:30 - 17:00 1.50 DRILL P PROD1 POH for new bit. 17:00 - 17:15 0.25 DRILL P PROD1 PJSM for LD Drilling BHA, discuss procedure, hazards and mitigations 17:15 - 19:00 1.75 DRILL P PROD1 LD drilling BHA PU drilling BHA w/new mtr and bit. 19:00 - 20:40 1.67 DRILL P PROD1 RIH Drilling BHA #8 w/ 1.1 deg motor, RES, & Smith BC bit. 20:40 - 21:00 0.33 DRILL P PRODi Log tie-in. Correction (-5') 21:00 - 21:10 0.17 DRILL P PROD1 RIH to TD. 21:10 - 23:10 2.00 DRILL P PROD1 Drill Z2B build from 10078' 2.6/2.6 bpm ~ 2900-3350 psi, 2900 psi FS 2.5k-4.2k# DHWOB, 30-90 fph, 85-95 TF, 86 deg inc IA = 0, OA = 193, PVT = 283, ECD = 10.1 Drill to 10145'. 23:10 - 00:00 0.83 DRILL P PROD1 Drill Z2B build from 10145' 2.7/2.7 bpm @ 3100-3520 psi, 2900 psi FS 3.9k# DHWOB, 30-140 fph, 100-140 TF, 88 deg inc IA = 0, OA = 260, PVT = 280, ECD = 10.2 Drill to 10194'. 1/10/2009 00:00 - 01:00 1.00 DRILL P PROD1 Drill Z2B build from 10,194' 2.5/2.5 bpm ~ 3200 psi, 2800 psi FS 3.5k-3.9k# DHWOB, 80 fph, IA = 0, OA = 270, PVT = 279, ECD = 10.1 Drill to 10250'. 01:00 - 02:25 1.42 DRILL P PROD1 Wiper trip to 9,300' 02:25 - 04:00 1.58 DRILL P PRODi Drill Z2B build from 10,250' 2.5/2.5 bpm ~ 2850-3000 psi, 2710 psi FS 1.4k-2.3k# DHWOB, 30-40 fph, 90-120 TF, 85 deg inc IA = 0, OA = 293, PVT = 269, ECD = 10.2 Drill to 10295'. 04:00 - 05:10 1.17 DRILL P PROD1 Drill Z2B build from 10,295' 2.5/2.5 bpm ~ 3100 psi, 2710 psi FS 2.4k-3.Ok# DHWOB, 60-80 fph, 120 TF, 85 deg inc IA = 0, OA = 293, PVT = 269, ECD = 10.1 Drill to 10345'. Printed: 2/9/2009 2:00:27 PM ~ ~ BP EXPLORATION Page 5 of 13 Operations. Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date ii From - To ~ Hours Task Code NPT Phase Description of Operations 1/10/2009 04:00 - 05:10 1.17 DRILL P PROD1 Mud Swap. New FloPro at bit at 10350'. Take first FloPro UAF samples, new mud. 05:10 - 06:00 0.83 DRILL P PROD1 Drill Z2B from 10345'. 06:00 - 06:30 I 0.501 DRILL I P I I PRODi 06:30 - 07:30 1.00 DRILL P PROD1 07:30 - 09:45 2.25 DRILL P PROD1 09:45 - 11:30 1.75 DRILL P PROD1 11:30 - 11:45 0.25 DRILL P PROD1 11:45 - 12:15 0.50 DRILL P PRODi 12:15 - 12:30 0.25 BOPSU P PROD1 12:30 - 13:15 0.75 DRILL P PROD1 13:15 - 15:00 1.75 DRILL P PRODi 15:00 - 15:15 0.25 DRILL P PROD1 15:15 - 17:00 1.75 DRILL P PROD1 17:00 - 17:30 0.50 DRILL P PROD1 17:30 - 18:05 0.58 DRILL P PROD1 18:05 - 20:10 2.08 DRILL N RREP PROD1 20:10 - 21:50 1.67 DRILL P PROD1 21:50 - 00:00 2.17 DRILL P PROD1 1/11/2009 00:00 - 00:15 0.25 DRILL P PROD1 00:15 - 02:05 1.83 DRILL P PROD1 02:05 - 02:20 0.25 DRILL P PROD1 02:20 - 03:25 1.08 DRILL P PROD1 03:25 - 06:00 2.58 DRILL P PROD1 2.7/2.7 bpm ~ 3300 psi, 3000 psi FS 2.2k#-2.7k# DHWOB, 35-40 fph, 35-80 TF, 84 deg inc IA = 0, OA = 175, PVT = ---, ECD = 10.0 Drill to 10379' Drill Z2B, 2.6 bpm, 3000 fs, 3100-3600 psi, 9.9 ecd, 40 fph, drilled to 10400 Wiper trip to window. Clean hole. RIH clean to bottom. Drill Z2B, 2.6 bpm, 3000 fs, 3100-3600 psi, 90R TF, 3-4 k wob, 10.0 ecd, 30-50 fph, Started stacking wt, no motor work. Bit is worn out. Drilled to 10475'. POH for bit. SAFETY MEETING. Review procedure, hazards and mitigation for Changing BHA. Stand back CoilTrak tools. Break off bit. Did weekly BOPE function test. OK. M/U CoilTrak /RES BHA #9 w/ Smith BC Bit, 1.1 deg motor, CoilTrak and RES. BHA OAL = 78.99'. RIH with CoilTrak /RES BHA #9 Circ at 0.2 bpm. 1100 PSI. Log GR tie-in to RA tag. -6' CTD. Drill Z26, 2.6 bpm, 2850 fs, 3000-3400 psi, 140R, 92 deg incl, No HOT yet. 2K WOB, 70 fph, 10 ECD, Drilled to 10525' Slow drilling, stacking wt with little motor work, Bit is shot. 4-5K wob, no progress. Drilled to 10530' POH for new bit. POH to 8800'. Electrical box supplying the SWS power pack traction motor failed. Stop POH. Called rig electrician to repair box. SAFETY MEETING discussing hazards, mitigations, and procedure to open electrical box & to prevent coil from freezing up. Fix fried connection in electrical box. Pumps off for total of 37 minutes and coil did not freeze up (outside temp -31 F). POOH to surface. SAFETY MEETING discussing procedures, hazards, and mitigations to UD BHA. UD BHI tools. B/O motor & bit. Bit Graded (7,2, RO, N) MU new orienter and test BHI tools on pipe skate. PU BHA #10 PU BHA #10 RIH BHA #10 w/ 1.3 deg motor, RES, new orienter, and HYC 3.75" PDC bit. Log tie-in. Correction (-2') RIH to TD. Drill Z2B build from 10,528' 2.5/2.5 bpm ~ 2830-3000 psi, 2750 psi FS Printed: 2/9/2009 2:00:27 PM ~ ~ BP EXPLORATION Operations Summary Report Page 6 of 13 Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To ' Hours Task Code NPT Phase Description of Operations 1/11/2009 03:25 - 06:00 2.58 DRILL P PRODi 1.5k-3.3k# DHWOB, 5-115 fph, 90-165 TF, 85-88 deg inc 80 FPH, better ROP with DS49 Bit. IA = 0, OA = 210, PVT = 282, ECD = 9.9-10.0 Drill to 10640'. 06:00 - 06:50 0.83 DRILL P PROD1 Drill Z2B build from 10,640' 2.5/2.5 bpm ~ 3050-3150 psi, 2750 psi FS ~, 2.2k-3.Ok# DHWOB, 60-100 fph, 10-55 TF, 89-90 deg inc ~~, IA = 0, OA = 305, PVT = 280, ECD = 10.0 Drill to 10,700'. 06:50 - 08:00 1.17 DRILL P PROD1 Wiper to window. Clean hole. RIH clean to bottom. 08:00 - 09:30 1.50 DRILL P PROD1 Drill Z26 lateral, 2.5 bpm, 2800 fs, 2900-3500 psi, 90R TF, 95 incl, 2-3K WOB, 80-120 fph, Very good ROP. Drilled to 10800' 09:30 - 10:10 0.67 DRILL P PROD1 Drill Z26 lateral, 2.5 bpm, 2800 fs, 2900-3500 psi, 90R TF, 95 incl, 2-3K WOB, 120 fph, Drilled to 10850'. 10:10 - 11:15 1.08 DRILL P PROD1 Wiper to window. Clean hole. RIH clean to bottom. 11:15 - 12:15 1.00 DRILL P PROD1 Drill Z26 lateral, 2.5 bpm, 2800 fs, 3000-3600 psi, 90R TF, 91 incl, 3-4K WOB, 120 fph, Drilled to 10,950'. 12:15 - 13:00 0.75 DRILL P PROD1 Drill Z2B lateral, 2.5 bpm, 2800 fs, 3000-3600 psi, 90R TF, 91 incl, 3-4K WOB, 120 fph, Drilled to 11,000' 13:00 - 14:15 1.25 DRILL P PROD1 Wiper trip up to 8900'. Clean hole. RIH to window. 14:15 - 14:25 0.17 DRILL P PROD1 Log GR tie-in at RA tag. Add 3' CTD. 14:25 - 14:45 0.33 DRILL P PROD1 RIH clean to bottom. 14:45 - 15:45 1.00 DRILL P PROD1 Drill Z2B lateral, 2.5 bpm, 2950 fs, 3000-3600 psi, 10L TF, 91 incl, 3-4K WOB, 100 fph, Drilled to 11090'. 15:45 - 16:40 0.92 DRILL P PRODi Drill Z2B lateral, 2.5 bpm, 2950 fs, 3000-3600 psi, 10L TF, 93 incl, 3-4K WOB, 100 fph, Drilled to 11,150'. 16:40 - 18:00 1.33 DRILL P PRODi Wiper to window. Clean hole. RIH clean to bottom. 18:00 - 18:30 0.50 DRILL P PROD1 Drill Z26 lateral, 2.5 bpm, 3000 fs, 3000-3600 psi, 90L TF, 93 incl, 3-4K WOB, 80 fph, Drilled to 11190'. 18:30 - 20:30 2.00 DRILL P PRODi Drill Z26 build from 11,190' 2.5/2.5 bpm ~ 3100-3400 psi, 3000 psi FS 3.2k-4.3k# DHWOB, 50-90 fph, 275-300 TF, 91-93 inc IA = 0, OA = 500, PVT = 258, ECD = 10.4 Drill to 11,300'. 20:30 - 22:35 2.08 DRILL P PROD1 Start Mud Swap. Wiper to window. 22:35 - 00:00 1.42 DRILL P PROD1 Drill Z26 build from 11,297' 2.35/2.29 bpm ~ 3150-3500 psi, 2850 psi FS 4.1k# DHWOB, 100-140 fph, 280-290 TF, 90-91 inc IA = 17, OA = 166, PVT = 284, ECD = 10.1 Drill to 11,450'. 1/12/2009 00:00 - 01:30 1.50 DRILL P PRODi Wiper to 8900'. Clean hole. Tie-In. 01:30 - 01:40 0.17 DRILL P PROD1 Log tie-in. Correction (+6'). 01:40 - 02:40 1.00 DRILL P PROD1 Wiper to TD. Printed: 2/9/2009 2:00:27 PM ! i BP EXPLORATION Page 7 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations __ - -- 1/12/2009 02:40 - 03:40 1.00 DRILL -- P PROD1 Drill Z26 build from 11,450' 2.52/2.45 bpm ~ 3340 psi, 2875 psi FS 2.3k-2.6k# DHWOB, 95 fph, 90 TF, 90 inc IA = 18, OA = 282, PVT = 260, ECD = 10.0 Drill to 11,540'. Orienter shutting down frequently giving intermittent data starting at 03:00. We are holding a 90 TF at 90 inclination and the DD is checking the inclination with the DGS and when the orienter is working. He is confident we can continue drilling with good directional control with the intermittent data. 03:40 - 04:20 0.67 DRILL P PROD1 Drill Z2B build from 11,540' 2.54/2.50 bpm ~ 3250 psi, 2875 psi FS 2.3k-2.6k# DHWOB, 100-110 fph, 80-90 TF, 90 inc IA = 22, OA = 295, PVT = 253, ECD = 10.2 r'll t 11 587'. Lost motor work, differential pressure, and reactive torque. 04:20 - 07:15 2.92 DRILL P PROD1 POH to check motor bit. Plus PU new HOT. 07:15 - 07:30 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing BHA. 07:30 - 09:40 2.17 DRILL P PRODi La out Coiltrak tools, motor and bit. Bit graded at( 8,6,1/8"). M/U used HYC DSX Bit, 1.2 deg new motor, CoilTrak /RES tools. BHA OAL = 78.76 09:40 - 11:10 1.50 DRILL P PROD1 RIH with CoilTrak /RES lateral BHA # Circ at 0.25 bpm, 1050 psi. RIH clean thru window. 11:10 - 11:30 0.33 DRILL P PROD1 Log GR tie-in at RA tag. -10' D. 11:30 - 12:00 0.50 DRILL P PROD1 RIH clean to 11090'. Stack wt at 11090'. Last bit was 1/8" under gauage, due to broken gauge cutters. 12:00 - 13:00 1.00 DRILL P PROD1 Ream under gauge hole to bottom at 4 fpm, 250 fph. 2.5 bpm, 3000 psi. - Reamed down to 11,192'. 13:00 - 22:30 9.50 DRILL N SFAL PROD1 Generator #2 failed at 1300 hrs. Rig electricians looking at doing repairs on generator. POH slow to 8900'. Park coil. Open EDC and Circ at 0.2 bpm at 1050 psi. Electricians determined that Generator Exciter had failed and Nordic 2 had a spare one, so plan forward is to replace the exciter and test Gen 2. 22:30 - 22:50 0.33 DRILL N SFAL PROD1 Circulate 2.7 bpm from 8900' to window and back up to 8900' to clean up the 7-5/8" casing. 22:50 - 00:00 1.17 DRILL N SFAL PROD1 RIH to 11,192'. 1/13/2009 00:00 - 03:00 3.00 DRILL P PROD1 Ream from 11192'. 2.5 bpm ~ 3000-3200psi, 2970 FS. 0.9k-1 k# DHWOB, 1-6 fpm with frequent stalling Ream to 11538'. 03:00 - 04:00 1.00 DRILL P PRODi Ream from 11538'. 2.57/2.51 bpm ~ 3000-3050psi, 2970 FS. 0.9k-1k# DHWOB, 2-5 fpm with frequent stalling Ream to 11566'. Motor rubber coming over the shaker and stalling frequency is increasing. Printed: 2/9/2009 2:00:27 PM BP EXPLORATION Page 8 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: ~ I NPT Phase Description of Operations Date I From - To Hours Task Code _._ 1/13/2009 03:00 - 04:00 1.00 DRILL _._ P PROD1 Weak stalls. 04:00 - 07:15 3.25 DRILL N DFAL PRODi POH for new motor & bit. 07:15 - 07:30 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing out BHA. 07:30 - 08:30 1.00 DRILL N DFAL PROD1 Lay out BHA. Bit in good condition, 1 chipped cutter. In gauge. (1,2,1 ). 08:30 - 12:45 4.25 DRILL N DFAL PROD1 CT had worn area above CTC. Pump slack management. Cut off 85' coil. M/U SWS CTC and pull test and pull test with 36K. M/U BHI UOC and test E-Line. Press test CTC with 3500 psi, small leak past O-ring. Cut off CTC and 10' of coil. M/U SWS CTC. Pull and press test. M/U BHI UOC and test E-Line. Thaw coil. 12:45 - 14:00 1.25 DRILL N DFAL PROD1 M/U CoilTrak/RES lateral BHA #12 with HYC 3.75" PDC Bit #7, 1.2 deg motor, CoilTrak and RES tools. BHA OAL = 78.76'. Test Tools at surface. 14:00 - 16:00 2.00 DRILL N DFAL PRODi RIH with BHA #12, circ at 2.5 BPM, 2200 psi while RIH. 16:00 - 16:15 0.25 DRILL N DFAL PROD1 Log GR tie-in at RA tag. -9' CTD. 16:15 - 17:00 0.75 DRILL N DFAL PROD1 RIH clean to 11560'. 17:00 - 17:30 0.50 DRILL P PROD1 Ream to bottom at 1 fpm. 17:30 - 18:15 0.75 DRILL P PROD1 Drill Zi B lateral, 2.5 bpm, 2900 FS, 3000-3400 psi, 70R TF, 90 deg, 2K WOB, 60 fph, 10.1 ecd, Drilled to 11640'. 18:15 - 19:50 1.58 DRILL P PROD1 Continue drilling Z1 B lateral, maintain 90-91 deg inc to gain around 2 ft TVD, and continue RH turn until 11,683 ft. 2.53 / 2.50 bpm @ 3000-3800 psi. PVT = 302 bbls. ROP is 60-100 ft/hr with 2-3 Klbs DWOB. Drill to 11,750 ft. 19:50 - 22:20 2.50 DRILL P PROD1 Wiper trip from 11,750 ft to window. Slight motor work (100-200 psi) seen at 11150 ft, and 10970-10930 ft. 5 Klbs overpull at 10,140 ft. 22:20 - 00:00 1.67 DRILL P PROD1 Drill from 11,750 ft at 2.64 / 2.59 bpm. PVT = 272 bbls. DWOB is 1-3 Klbs with Ct wt 1-6 Klbs. Stacking wt after 11,830 ft. Drill to 11,841 ft. 1/14/2009 00:00 - 01:00 1.00 DRILL P PROD1 Continue drilling from 11,841 ft to TD of 11,860 ft. 01:00 - 04:20 3.33 DRILL P PROD1 Call TD at 11,860 ft. Wiper trip back to window. Log GR tie-in from 9,260 ft, correct +5 ft. Continue wiper trip to bottom. Ta at 11 861 ft official TD. PVT = 241 bbls, losing about 6-9 bbls/hr. 04:20 - 06:00 1.67 DRILL P PROD1 POOH. Clean 7" casing then run down to window and open EDC. 06:00 - 07:45 1.75 DRILL P PROD1 POH with drilling BHA. circ at 2.7 bpm, 2500 psi. 07:45 - 08:00 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for lay out BHA. 08:00 - 09:00 1.00 DRILL P PRODi Lay out CoilTrak BHA. 09:00 - 09:30 0.50 EVAL C PROD1 Reverse circ 2 bbl MEOH to freeze protect coil to reel. 09:30 - 09:45 0.25 EVAL C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for M/U SWS wet connect to CTC. Printed: 2/9/2009 2:00:27 PM • w BP EXPLORATION Page 9 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date .From - To Hours .Task ~, Code ~ NPT ~ Phase Description of Operations 1/14/2009 09:45 - 12:15 2.50 EVAL C PROD1 M/U electrical wet connection to 2-3/8" Reg pin on SWS CTC. Test E-Line to logging unit. 12:15 - 12:30 0.25 EVAL C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for M/U SWS logging BHA with sources. 12:30 - 14:00 1.50 EVAL C PRODi M/U SWS logging BHA with 2 sources. ', BHA OAL = 84.0'. ~ 14:00 - 15:30 1.50 EVAL C PROD1 Test SWS OH logging tools at surface. RIH while pumping 1.5 bpm. Short in BHA at 2000'. 15:30 - 16:15 0.75 EVAL X DFAL PROD1 POH. Reverse circ 2 bbl MEOH into coil to freeze protect surface coil. 16:15 - 16:30 0.25 EVAL X DFAL PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for checking tools for electrical short. 16:30 - 18:45 2.25 EVAL X DFAL PROD1 Break connection to logging tools, wet connect had leaked, try a different type of wet connect seal. 18:45 - 21:00 2.25 EVAL X DFAL PROD1 M/U CT riser. RIH. 21:00 - 23:00 2.00 EVAL C PROD1 Log down from 8,800 ft. Tie-in depth, no correction. Pass through window with no wt bobble, then log OH section at 25 Wmin. 23:00 - 00:00 1.00 EVAL C PROD1 Log up from 11,840 ft. Lay in liner pill. 1/15/2009 00:00 - 01:00 1.00 EVAL C PROD1 Continue logging up to 8800 ft. 01:00 - 02:05 1.08 EVAL C PRODi Log back down to 9450 ft and up again to 8800 ft. 02:05 - 03:45 1.67 EVAL C PRODi POOH. 03:45 - 03:55 0.17 EVAL C PROD1 SAFETY MEETING. PJSM for laying out logging tools. 03:55 - 05:20 1.42 EVAL C PROD1 Tag stripper. Break off CT riser. L/D logging tools and load out. 05:20 - 06:30 1.17 CASE P RUNPRD Install cable boot. M/U 1 jt of PH6 tubing, M/U CT riser. Pump out slack, circ 4.5 bpm, 3 times until line quit moving. Cut off 315' of E-Line. 06:30 - 08:00 1.50 CASE P RUNPRD Cut off SWS CTC and M/U BTT CTC and pull test. Prep rig floor / pipeshed to run liner. 08:00 - 08:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running liner. 08:15 - 12:30 4.25 CASE P RUNPRD M/U Indexing Guide shoe, Flt cllr, 1 jt, Flt Cllr, 2' pup, Landing cllr and 42 its of 2-7/8" STL liner with turbos and one 10 ft pup jt Slow running of liner, training personnel on running liner, also rig blocks are hanging 1 ft towards the front of the rig, so a tugger must be used to line up each joint for makeup. Stop and fill liner with water. 12:30 - 16:00 3.50 CASE P RUNPRD M/U 48 jts of 3-3/16" TCII liner with turbos and one 10' pup jt for space out of top of liner. M/U XO and 1 jt 3-1/2" liner. 16:00 - 18:30 2.50 CASE P RUNPRD M/U BTT 3.70" Deployment sleeve with 10' x 3-1/2" STL pup jt with LWP inside. M/U Hyd disc, 6 jts PH6, Swivel and CTC. Liner OAL = 2977.8' BHA OAL = 31 1.7'. Circ FloPro at surface to fill liner. 18:30 - 20:50 2.33 CASE P RUNPRD Circ until returns are clean, then RIH. Circ pressures very high when RIH, about 1500 psi at 0.1 bpm. Printed: 2/9/2009 2:00:27 PM ~ ~ BP EXPLORATION Page 10 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code ~ NPT `Phase Description of Operations 1/15/2009 18:30 - 20:50 2.33 CASE P RUNPRD Wt check at 9,000 ft is 38 Klbs. Continue RIH to bottom. Nothin seen assin window. Start to stack wt last 200 ft. 20:50 - 21:10 0.33 CASE P RUNPRD Stop at 11,875 ftwith -8K string wt, not able to push any further. Shut down pump and pick up, up wt is 42 Klbs. Pick up to string wt again and stack down to -6K string wt. Establish circulation: 1.0 / 0.9 bpm ~ 2760 psi. 1.6 / 1.5 bpm ~ 3240 psi. 2.05 / 1.95 bpm ~ 3600 psi. Shut down pump and drop ball. 21:10 - 21:30 0.33 CASE P RUNPRD Launch steel ball with 1300 psi. Chase at 2.15 / 2.0 bpm ~ 3600 psi. Ball is heard rolling. Slow down pump to 1 bpm at 30 bbls away. Ball on seat at 33.9 bbls, shears at 4800 psi. 21:30 - 00:00 2.50 CASE P RUNPRD Shut down pump and pick up, new up wt is 31 K, stop 11864 ft, 1 ft after wt breaks over. Run back to -6K string wt and start 2% double slick KCL down CT. Circ wellbore to KCI water. After KCI around, pump 1.5 / 1.35 bpm ~ 490 psi. Mix 70 bbls Biozan in pit #3. 1/16/2009 00:00 - 00:20 0.33 CEMT P RUNPRD Continue mixing 70 bbls 2# Biozan in Pit #3. 00:20 - 00:35 0.25 CEMT P RUNPRD SAFETY MEETING. PJSM for pumping cement. Procedures and high pressure pumping were discussed. 00:35 - 01:20 0.75 CEMT P RUNPRD Batch up 24.6 bbls pumpable cement. 01:20 - 02:50 1.50 CEMT P RUNPRD Cement is up to weight. PT cement line to 6500 psi. Open back up to CT, start cement down CT. Shut down at 24.6 bbls cmt pumped and isolate reel, pump bio back to cmt van to clean lines. Open back up to reel, zero In/Out MM, start displacement with Biozan. At 45.1 bbls on In MM cmt is at shoe, zero Out MM, leave In MM running. At 47.7 bbls on In MM, shut down leaving 2 bbls cmt inside CT + PH6. Pick up CT to see wt break over at 11,864 ft then pick up another 13 ft. Pump 5 bbls to exhaust 2 bbls cmt + 3 bbls Biozan. Open Baker choke and sting back into sleeve at 11,874 ft. Hold -7K CT wt. Close Baker choke and pressure up to 2290 psi to shear LW P. Chase plug at 1.57 / 1.35 bpm ~ 1700 - 1900 psi. Volume in Volume out 0 0 2.6 2.3 4.9 3.3 9.9 8.2 14.8 12.6 23.5 20.8 Bump plug at 73.7 bbls on In MM (Calculated 73.6), pressure Printed: 2/9/2009 2:00:27 PM • BP EXPLORATION Page 11 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: ~ ~ Description of Operations NPT Phase Date From - To Hours Task Code 1/16/2009 01:20 - 02:50 1.50 CEMT P RUNPRD up 1000 psi over pump pressure and shut down pump. Hold for 3 minutes, good. Open Baker choke and check floats, floats holding. Close choke and pressure up to 500 psi, pull out of sleeve and pump another 1 bbl then POOH. Total of 20.8 bbls cmt behind pi e. All arameters of cement ~o were normal. 02:50 - 04:00 1.17 CEMT P RUNPRD POOH replacing coil voidage. 04:00 - 04:15 0.25 CEMT P RUNPRD Tag stripper. SAFETY MEETING. PJSM for UD SELRT and PH6. 04:15 - 04:45 0.50 CEMT P RUNPRD L/D PH6 and liner runnin tools. Stinger shear pin has sheared and tool looks normal. Load out liner running tools. 04:45 - 09:00 4.25 PERFO P LOWERI M/U BHA #15: 2.30 Diamond Parabolic Mill BTT 2-1/8" Extreme Motor BTT DUAL CIRC SUB, 1/2" BALL SEAT BTT HYD DISC, 5/8" BALL SEAT XO, 1-1/4" CSH X 1-1/2" MT 49 stands 1.25 CSH ave 30.99' XO, 2-3/8 REG X 1-1/4 CSH BOT HYD DISC, 3/4" BALL DBPV XO, 2-3/8" PH6 X 2-3/8 Reg 4 JTS OF 2-3/8 PH-6 Tubing BOT X-O, 2-7/8" PAC X 2-3/8" PH6 Lockable swivel X-O, 2-3/8" PH6 X 2-7/8" PAC BOT SLIP TYPE CTC BHA OAL = 3,249.76 ft Change out CT pack off. 09:00 - 11:00 2.00 PERFO P LOWERI RIH with 2.30" mill, motor, cleanout BHA #15. Circ at 1.0 bpm. full returns. 11:00 - 13:50 2.83 PERFO P LOWERI Tag BTT AL profile at 8891 ft. mill AL, 1.7 bpm, 2200 psi, 5 stalls. SWS CMT UCA sample at 1600 psi at 1300 hrs. Mill thru AL rofile at 8891.4'. Back ream, ream down clean. 13:50 - 15:00 1.17 PERFO P LOW ERi RIH at 35-50 fpm, 1.7 bpm, 1300 psi, Circ new 2% KCL double slick fluid to replace dumped fluid volume. Tag PBTD at 11 824' CTD uncorrected. PBTD from- com letion is 11,820'. 15:00 - 17:00 2.00 PERFO P LOWERI POH while laying in new FloPro 20 bbl pert pill. 1.5 bpm, 1100 psi. 17:00 - 17:15 0.25 PERFO P LOWERi SAFETY MEETING. Review procedure, hazards and mitigation for laying out BHA and standing back CSH. 17:15 - 21:40 4.42 PERFO P LOW ERi Lay out 4 jts PH6. Pump 1/2" ball to open Circ sub. M/U safety joint. Standback 49 stds of 1-1/4" CSH. L/D motor and mill, recover 1/2" ball. 21:40 - 22:30 0.83 PERFO P LOWERI Fill well and perform liner lap test. Time Pressure Printed: 2/9/2009 2:00:27 PM ~ ~ BP EXPLORATION Page 12 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 1/16/2009 121:40 - 22:30 I 0.831 PERFOBI P 22:30 - 00:00 I 1.501 PERFOBI P 1/17/2009 00:00 - 01:20 1.33 PERFO P 01:20 - 02:10 0.83 PERFO N 02:10 - 04:30 2.33 PERFO P 04:30 - 06:20 I 1.831 PERFOBI P 06:20 - 07:10 0.831 PERFOB~ P 07:10 - 09:15 I 2.081 PERFOBI P 09:15 - 09:30 0.25 PERFO P 09:30 - 11:30 2.00 PERFO P 11:30 - 11:45 0.25 PERFO P 11:45 - 16:00 4.25 PERFO P LOWERI 0 2047 psi 5 2036 10 2021 15 2014 20 2007 25 2000 30 1992 Liner lap test is good conduct PJSM for M/U perf guns while Join la test. LOWERI Load up tool boxes and running equipment to rig floor. Run perf guns as per program: SWS 2" PJ PERF GUNS & FIRING HEAD, 1/2" BTT HYD DISC, 5/8" BALL SEAT XO, 1-1/4" CSH X 1-1l2" MT 32 stands 1.25 CSH ave 30.99' XO, 2-3/8 REG X 1-1/4 CSH BOT HYD DISC, 3/4" BALL DBPV XO, 2-3/8" PH6 X 2-3/8 Reg 4 JTS OF 2-3/8 PH-6 Tubing BOT X-O, 2-7/8" PAC X 2-3/8" PH6 Lockable swivel X-O, 2-3/8" PH6 X 2-7/8" PAC BOT SLIP TYPE CTC LOWERI Continue M/U perf guns.. LOWERI Run disconnect next, it is seen to have a loose mandrel. Shut down and call BTT for another one. LOWERi New disconnect arrives, M/U to firing head and run 32 stds CSH. Pick up injector and M/U swivel. LOWERI RIH with BHA #16, perf guns +CSH. Ta PBTD at 11827'. Correct CTD to 11,820' u depth, -7' correction. Ta a ain and ick u on de th at 11820'. LOWERI Pump 5 bbl new FloPro, Drop 1/2" AL ball, Displ with 5 bbl new FloPro and KCL water at 2.0 bpm, 1850 psi, ball is moving in coil. Position bottom shot at 11802'. Slow pump to 1 bpm, 600 psi. at 35 bbls. Ball on seat at 49 bbl displ. Pull guns and firing head sheared at 3200 psi. Fired uns on de th with bottom shot at 11 800'. Good shot detection, lost returns for 2 bbls. LOW ER1 POH with fired perf guns. circ 1 bpm at 450 psi. Flow check at 8800', no flow. POH. Flow check at surface, no flow. LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for standing back CSH. LOW ERi Lay out 4 jts PH6 and Stand back 32 stds of 1-1/4" CSH. LOWERI SAFETY MEETING. Review procedure, hazards and mitigation for laying out fired perf guns and blanks. LOWERI UO SWS 2" fired erf uns. All shots fired. PERFORATED INTERVALS: 2" SWS PJ, 6 SPF Printed: 2/9/2009 2:00:27 PM • • BP EXPLORATION Page 13 of 13 Operations Summary Report Legal Well Name: E-36 Common Well Name: E-36 Spud Date: 6/12/1995 Event Name: REENTER+COMPLETE Start: 12/17/2008 End: 1/17/2009 Contractor Name: NORDIC CALISTA Rig Release: 1/17/2009 Rig Name: NORDIC 1 Rig Number: Date From - To j Hours Task ~ Code NPT' Phase Description of Operations 1/17/2009 11:45 - 16:00 4.25 PERFO P LOWE 10,750 - 11,050' 11,200 - 11,500' 11,600 - 11,800' TOTAL PERFS = 800' 16:00 - 17:30 1.50 WHSUR P POST IH w/ nozzle to 2000'. Freeze protect the 4-1/2" tubing to surfaces with 20 bbl MEOH. 17:30 - 17:45 0.25 WHSUR P POST SAFETY MEETING. Review procedure, hazards and mitigation for setting BPV with T-Bar. Well is dead. 17:45 - 18:30 0.75 WHSUR P POST Set BPV with valve crew, using a T-bar. 18:30 - 18:45 0.25 WHSUR P POST SAFETY MEETING. PJSM for purging reel with N2. Use of traction devices and high pressure pumping were discussed. 18:45 - 20:00 1.25 RIGD P POST Pump 3 bbls McOH ahead, followed by 1500 scfm N2 for 15 min. Bleed off reel, purge kill manifold. 20:00 - 21:30 1.50 RIGD P POST Break off CT riser, remove BHA and CT connector. Install internal grapple and pull CT across pipe shed roof and onto reel. Secure CT to shipping reel and remove 1502 line from inside. 21:30 - 00:00 2.50 RIGD P POST N/D BOP stack. N/U tree cap. Load out old reel, lift up new one. PT tree cap to 4,000 psi, good. Release rig at 00:00, all further entries will be on K-06B daily report. Printetl: t/9/2UUy "L:UU:Z/ PM BP Alaska ~ r,• y~°' ~ '~~: ~~.? B HUGHES ~~,.. Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 1/15/2009 Time: 14:24:16 Page: 1 Ficld: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-36, True North Sitr. PB E Pad Vertical (TVD) Reference: 57:36 6/12/1995 00:00 64.1 Wcll: E-36 Section (VS) Reference: Well (O.OON,O.OOE,357.73Azi) i Fi'ellpath: E-36A Survey Calculation Method:. Minimum Curvature Db: Oracle ~ Annotation SID TVD ft ft -- 9223.86 8781.41 TIP 9224.00 8781.51 KOP 11861.00 9061.92 TD Survey: MWD Start Date: 1/8/2009 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path Survey _ Mll loci Azim 'fVD Sys TVD N/S E/W MapN MapE VS DLS Toul ft deg deg ft ft ft ft ft ft ft deg/100ft 9223.86 43.80 316.30 8781.41 8717.31 1584.24 -1125.60 5976908.87 662942.41 1627.63 0.00 MWD 9224.00 43.81 316.30 8781.51 8717.41 1584.31 -1125.67 5976908.94 662942.34 1627.70 8.70 MWD 9254.08 48.15 313.05 8802.41 8738.31 1599.49 -1141.06 5976923.78 662926.62 1643.48 16.37 MWD 9282.86 43.17 310.13 8822.52 8758.42 1613.16 -1156.43 5976937.12 662910.96 1657.75 18.77 MWD 9312.88 46.11 307.24 8843.88 8779.78 1626.33 -1172.90 5976949.92 662894.20 1671.57 11.90 MWD 9342.80 50.89 304.52 8863.70 8799.60 1639.44 -1191.06 5976962.63 662875.76 1685.39 17.36 MWD 9376.44 56.26 299.56 8883.68 8819.58 1653.76 -1214.00 5976976.44 662852.51 1700.60 19.88 MWD 9404.88 61.67 297.65 8898.34 8834.24 1665.41 -1235.39 5976987.62 662830.87 1713.09 19.87 MWD 9446.00 69.99 295.18 8915.16 8851.06 1682.06 -1268.97 5977003.53 662796.94 1731.06 20.96 MWD 9475.80 69.83 289.13 8925.40 8861.30 1692.61 -1294.88 5977013.50 662770.81 1742.62 19.07 MWD 9506.00 71.69 282.67 8935.36 8871.26 1700.40 -1322.28 5977020.70 662743.25 1751.50 21.11 MWD Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB E Pad TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5973160.88 ft Latitude: 70 19 59.134 N From: Map Easting: 662538.97 ft Longitude: 148 40 53.054 W Position Uncertainty: 0.00 ft Ground Level: 0.00 ft North Reference: Grid Convergence: True 1.24 deg Well: E-36 Slot Name: 36 E-36 Well Position: +N/-S 2154.64 ft Northing: 5975349.76 ft Latitude: 70 20 20.323 N +E/-W 1610.54 ft Easting : 664102.33 ft Longitude: 148 40 6.013 W Position Uncertainty: 0.00 ft Wellpath: E-36A 500292256301 Drilled From: Tie-on Depth: E-36 9223.86 ft Current Datum: 57:36 6/12/1995 00:00 Height 64.10 ft Above System Datum: Mean.Sea Level Magnetic Data: 12/23/2008 Field Strength: 57689 nT Declination: Mag Dip Angle: 22.91 deg 80.95 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.10 0.00 0.00 357.73 Survey Program for Definitive Wellpath Date: 8/27/2008 Validated: Yes Version: 5 Actual From To Survey Toolcode Tool Name ft ft 151.56 9223.86 1 : MWD -Standard (151.56-985 MWD MWD -Standard 9224.00 11861.00 MWD (9224.00-11861.00) MWD MWD -Standard „ti~~,a .: by ,~~~~~ ~ BP Alaska fit BAKER NuGHEs Baker Hughes INTEQ Survey Report 1NTEQ Company: BP Amoco Field: Prudhoe Bay Dute: 1/15/2009 Time: 14:24:16 Co-ordinate(NE) Reference: Well: E-36, True North Page: 2 Site: PB E Pad Vertical (TVD) Re ference: 57:36 6/12/199 5 00:00 64 .1 Well: E-36 Sectio n (VS) Refer ence: Well (O.OON,O.OOE,357.73Azi) Wcllpath: E-36A Survey Calculation Method: Minimum Curvat ure Db: O racle Survc~ MU Incl Azim TVD Sys TVD N/S E/W MapN J'TapE VS DLS Tuol ft deg deg ft ft ft ft - - ft ft - ft - deg/100 ft 9539.20 72.33 - 275.32 8945.63 - 8881.53 1705.33 -1353.45 5977024.94 662711.98 1757.66 21.14 MWD 9567.72 72.04 279.56 8954.36 8890.26 1708.85 -1380.36 5977027.87 662685.00 1762.24 14.19 MWD 9602.14 74.05 288.62 8964.42 8900.32 1716.87 -1412.25 5977035.19 662652.94 1771.52 25.84 MWD 9634.38 75.15 296.21 8972.99 8908.89 1728.71 -1440.96 5977046.40 662623.99 1784.50 22.95 MWD 9663.60 76.25 305.08 8980.22 8916.12 1743.13 -1465.29 5977060.29 662599.35 1799.87 29.65 MWD 9701.62 78.32 314.35 8988.61 8924.51 1766.81 -1493.78 5977083.33 662570.35 1824.66 24.40 MWD 9731.44 79.52 319.71 8994.34 8930.24 1788.22 -1513.71 5977104.30 662549.95 1846.84 18.09 MWD 9762.85 79.59 326.86 9000.04 8935.94 1812.96 -1532.17 5977128.63 662530.96 1872.30 22.39 MWD 9793.14 79.83 330.20 9005.45 8941.35 1838.38 -1547.72 5977153.70 662514.86 1898.31 10.88 MWD 9829.44 79.95 329.43 9011.83 8947.73 1869.27 -1565.69 5977184.18 662496.22 1929.89 2.11 MWD 9859.74 81.24 333.19 9016.78 8952.68 1895.49 -1580.04 5977210.08 662481.30 1956.65 12.96 MWD 9889.96 81.82 335.92 9021.23 8957.13 1922.47 -1592.88 5977236.78 662467.88 1984.13 9.14 MWD 9920.68 83.18 340.39 9025.24 8961.14 1950.74 -1604.20 5977264.79 662455.93 2012.82 15.09 MWD 9954.16 84.15 346.76 9028.94 8964.84 1982.64 -1613.61 5977296.47 662445.84 2045.07 19.13 MWD 9991.08 85.47 356.38 9032.29 8968.19 2018.96 -1618.99 5977332.67 662439.66 2081.58 26.19 MWD 10020.50 84.18 359.51 9034.94 8970.84 2048.24 -1620.04 5977361.91 662437.97 2110.88 11.47 MWD 10050.35 85.82 2.58 9037.54 8973.44 2077.97 -1619.50 5977391.64 662437.86 2140.56 11.63 MWD 10081.15 86.19 6.08 9039.69 8975.59 2108.60 -1617.18 5977422.32 662439.51 2171.07 11.40 MWD 10114.53 86.83 10.73 9041.72 8977.62 2141.55 -1612.31 5977455.36 662443.66 2203.81 14.04 MWD 10145.13 87.05 16.48 9043.36 8979.26 2171.24 -1605.12 5977485.20 662450.19 2233.18 18.78 MWD 10178.41 88.74 19.60 9044.58 8980.48 2202.86 -1594.82 5977517.03 662459.79 2264.37 10.66 MWD 10208.55 86.99 21.84 9045.70 8981.60 2231.02 -1584.17 5977545.42 662469.83 2292.09 9.43 MWD 10240.07 85.44 25.07 9047.79 8983.69 2259.87 -1571.65 5977574.54 662481.71 2320.42 11.35 MWD 10272.01 84.53 30.71 9050.58 8986.48 2287.98 -1556.78 5977602.97 662495.97 2347.92 17.82 MWD 10301.40 83.49 33.22 9053.65 8989.55 2312.78 -1541.30 5977628.09 662510.89 2372.08 9.20 MWD 10336.92 82.76 36.01 9057.90 8993.80 2341.80 -1521.28 5977657.54 662530.28 2400.28 8.06 MWD 10366.68 86.22 40.62 9060.76 8996.66 2365.03 -1502.91 5977681.17 662548.12 2422.77 19.31 MWD 10398.02 89.72 44.50 9061.87 8997.77 2388.09 -1481.74 5977704.68 662568.79 2444.97 16.67 MWD 10428.02 90.00 48.74 9061.94 8997.84 2408.69 -1459.94 5977725.75 662590.13 2464.69 14.16 MWD 10470.06 90.65 54.87 9061.70 8997.60 2434.67 -1426.91 5977752.45 662622.58 2489.34 14.66 MWD 10504.42 89.20 58.54 9061.75 8997.65 2453.53 -1398.20 5977771.93 662650.87 2507.05 11.48 MWD 10534.13 86.74 60.20 9062.80 8998.70 2468.66 -1372.65 5977787.61 662676.08 2521.15 9.99 MWD 10564.21 85.54 63.71 9064.83 9000.73 2482.76 -1346.17 5977802.30 662702.24 2534.20 12.31 MWD 10599.03 86.13 70.06 9067.36 9003.26 2496.39 -1314.25 5977816.62 662733.86 2546.54 18.27 MWD 10629.87 86.62 74.33 9069.31 9005.21 2505.80 -1284.95 5977826.66 662762.94 2554.78 13.91 MWD 10662.77 90.49 77.26 9070.14 9006.04 2513.87 -1253.08 5977835.43 662794.63 2561.58 14.75 MWD 10692.71 93.56 77.95 9069.08 9004.98 2520.29 -1223.86 5977842.48 662823.70 2566.84 10.51 MWD 10723.17 93.38 83.65 9067.24 9003.14 2525.15 -1193.86 5977848.00 662853.58 2570.51 18.69 MWD 10757.61 94.05 87.55 9065.00 9000.90 2527.78 -1159.60 5977851.38 662887.78 2571.78 11.47 MWD 10787.95 90.15 89.72 9063.89 8999.79 2528.51 -1129.29 5977852.77 662918.05 2571.30 14.71 MWD 10825.93 88.93 94.40 9064.20 9000.10 2527.14 -1091.35 5977852.23 662956.01 2568.43 12.73 MWD 10855.71 90.74 98.28 9064.28 9000.18 2523.85 -1061.76 5977849.60 662985.67 2563.97 14.38 MWD 10889.57 91.10 105.64 9063.74 8999.64 2516.84 -1028.66 5977843.31 663018.91 2555.66 21.76 MWD 10924.23 91.10 110.85 9063.07 8998.97 2506.00 -995.76 5977833.19 663052.04 2543.51 15.03 MWD 10955.23 89.30 109.94 9062.96 8998.86 2495.19 -966.71 5977823.03 663081.32 2531.57 6.51 MWD 10984.47 87.39 108.70 9063.81 8999.71 2485.52 -939.13 5977813.96 663109.10 2520.81 7.79 MWD 11026.23 86.99 104.15 9065.86 9001.76 2473.73 -899.13 5977803.05 663149.34 2507.44 10.92 MWD 11060.89 89.69 102.46 9066.86 9002.76 2465.76 -865.42 5977795.82 663183.22 2498.14 9.19 MWD 11097.91 92.64 101.87 9066.11 9002.01 2457.96 -829.24 5977788.81 663219.56 2488.91 8.13 MWD 11127.73 93.45 98.36 9064.52 9000.42 2452.73 -799.93 5977784.23 663248.97 2482.53 12.06 MWD 11158.31 92.27 94.56 9063.00 8998.90 2449.30 -769.59 5977781.46 663279.38 2477.89 13.00 MWD 11194.61 90.86 88.71 9062.01 8997.91 2448.26 -733.33 5977781.22 663315.65 2475.42 16.57 MWD 11223.27 90.80 84.76 9061.59 8997.49 2449.90 -704.73 5977783.48 663344.21 2475.92 13.78 MWD ~tiki,;.~w ~ ~ BP Alaska ~ Nuys p BAKER ~~~~~-~ Baker Hughes INTEQ Survey Report iNTEQ Company: BP Amoco Field: Prudhoe Bay Date: 1/15/2009 Time: 1424:16 Co-ordinate(NE) Reference: Well: E-36, True North Page: 3 ~ Site: PB E Pad Vertical (TVD) Reference: 57:36 6/12/19 95 00:00 64.1 Well: E-36 Sectio n (VS) Reference: Well (O.OON,O.OOE,357.73Azi) Wcllpath: E-36A Surve y Calculation Method: Minimum Curvature Db: Orade Survey - _ - -- _ -- MD incl Azim - TVD Sys TVD N/S E/W MapN MapE VS llLS Tool ft deg deg ft ft ft ft ft ft ft deg/10 0ft 11254.43 90.80 80.12 9061.15 8997.05 2453.99 -673.85 5977788.25 663374.98 2478.79 14.89 MWD 11288.25 90.15 75.99 9060.87 8996.77 2460.99 -640.77 5977795.97 663407.90 2484.47 12.36 MWD 11319.63 89.48 72.56 9060.98 8996.88 2469.50 -610.57 5977805.13 663437.91 2491.77 11.14 MWD 11354.71 90.03 68.55 9061.13 8997.03 2481.17 -577.50 5977817.52 663470.71 2502.12 11.54 MWD 11384.81 89.94 65.57 9061.13 8997.03 2492.90 -549.78 5977829.86 663498.16 2512.74 9.90 MWD 11416.47 89.41 62.68 9061.31 8997.21 2506.72 -521.30 5977844.29 663526.33 2525.42 9.28 MWD 11458.17 88.83 60.63 9061.95 8997.85 2526.51 -484.61 5977864.88 663562.58 2543.74 5.11 MWD 11489.23 89.51 61.13 9062.40 8998.30 2541.62 -457.48 5977880.59 663589.38 2557.77 2.72 MWD 11520.49 90.25 66.45 9062.47 8998.37 2555.43 -429.44 5977895.00 663617.10 2570.45 17.18 MWD 11574.09 90.37 70.49 9062.18 8998.08 2575.09 -379.59 5977915.75 663666.50 2588.12 7.54 MWD 11607.24 90.77 76.07 9061.85 8997.75 2584.63 -347.86 5977925.97 663698.02 2596.39 16.87 MWD 11639.49 91.63 82.99 9061.17 8997.07 2590.48 -316.17 5977932.52 663729.57 2600.98 21.62 MWD 11670.10 91.87 88.23 9060.24 8996.14 2592.82 -285.68 5977935.53 663760.00 2602.11 17.13 MWD 11700.99 92.61 92.93 9059.03 8994.93 2592.51 -254.82 5977935.89 663790.86 2600.58 15.39 MWD 11736.47 91.78 99.68 9057.67 8993.57 2588.62 -219.60 5977932.77 663826.15 2595.29 19.15 MWD 11766.05 88.44 102.76 9057.61 8993.51 2582.86 -190.59 5977927.65 663855.27 2588.39 15.36 MWD 11796.69 87.12 107.77 9058.80 8994.70 2574.81 -161.07 5977920.25 663884.97 2579.17 16.90 MWD 11816.78 87.24 112.03 9059.79 8995.69 2567.98 -142.20 5977913.83 663903.97 2571.60 21.19 MWD 11861.00 87.24 112.03 9061.92 8997.82 2551.41 -101.26 5977898.17 663945.27 2553.42 0.00 MWD WELLHEA Lh = 13-518" 5M FMC ACTUATOR = BAKER KB. ELEV = 63.4' BF. ELEV = 34.4' KOP = 1050' Max Angle = 94 @ 10757' Datum MD = 9342' Datum ND = 8800' SS ,~ NU 1 CJ: DRL{~ AFT E-36A 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" Minimum ID = 2.30" a~ 8892' BTT AL PROFILE, Milled out 41/2" OTIS HXO SSSVN NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4830 4812 12 CA OM BK 16 01/29/09 1 6265 6174 23 CA SO BK 20 01!29109 $$$3' ~ LINER TOP, 2.30" Milled Profile @ 8892" 8902' 41 /2" HES X NIP, ID = 3.813" 8914' 7-Sl8" x 41/2" BKR S3 PKR, ID = 3.875" 8933' 3-1/2 x 3-3116" X-over 8937' 41 /2" HES X NIP, ID = 3.813" ggg8' , 4112" HES XN NIP, ID milled to = 3.80" 41 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 41/2" x 7-5/8"whipstock I 9224' I PERFORATION SUMMARY REF LOG: BHI MWD/GR/ROP/RES, 01/14/2009 ANGLE AT TOP PERF: 91 ° ~ 10,750' Note: Refer to Production DB for historical perf data SQE SPF INTERVAL OpNSgz DATE 2 6 10750 - 11050 O 01 /17/09 2 6 11200 - 11500 O 01 /17109 2 6 11600 - 11800 O 01/17/09 7-5/8" CSG, 29.7ff, L-80 NSCC, .0459 bpf, ID = 6.875" 4112" WLEG, 10 = 4.000" ELMD TT LOGGED 10/04!95 9180' TOC 10484' 3-3116 x 2-7/8 X-over 11820 3-3/16" X 2-7/8" 11861' ~~TOTAL DEPTH, 3.75" HOLE and perted DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/05/95 ORIGINAL COMPLETION WELL: E-36A 08!10101 RN/TP CORRECTIONS PERMIT No: 208-149 01/17/09 NORDICI CTD SIDETRACK E~6A API No: 50-029-22563-01 01/24/09 /TlH CORRECTIONS SEC 6, T11 N, R14E, 1705' FNL &887 FEL 02/05/09 GJF/SV GLV CIO (01 /29109) 0o c,..,~......:.... ~w~...~.~~ i r ALASSA OIL A1~TD GA.S C01~5ERQATIOI~T COMNII55IOI1T John McMullen Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 SARAH PAL/N, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-36A BP Exploration Alaska Inc. Permit No: 208-149 Surface Location: 1706' FNL, 882' FEL, SEC. 06, T11N, R14E, UM Bottomhole Location: 828' FSL, 880' FEL, SEC. 31, T12N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit iri the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely Daniel T. Seamount, Jr. Chair r~ DATED this 3 day of October, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~..~ STATE OF ALASKA~~ ALAS~IL AND GAS CONSERVATION COMMON ~ ~!~ :~ ~~ 2~u~ PERMIT TO DRILL ~ ~~~'~- 20 AAC 25.005 ~1~~~~3 ~ ~ :. `- '~ ' :.:. 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify i ' b7{ as pr~{3osed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU E-36A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11860' TVD 8990'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028304 & 028299 Pool FEL, SEC. 06, T11 N, R14E, UM 1706 FNL, 882 Top of Productive Horizon: 1985' FEL, SEC. 06, T11N, R14E, UM 140' FNL 8. Land Use Permit: 13. Approximate Spud Date: December 1, 2008 , Total Depth: 828' FSL, 880' FEL, SEC. 31, T12N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 4,200' 4b. Location of Well (State Base Plane Coordinates): Surface: x-664102 y-5975350 Zone-ASP4 10. KB Elevation (Height above GL): 64.1' feet 15. Distance to Nearest Well Within Pool: 764' 16. Deviated Wells: Kickoff Depth: g230 feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3423 Surface: 2543 18. Casin Pr ram: S ecifications To - Se in De th -Bo ttom uantit of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 /8" 3-1lz" x 33/16" 9.3# / 6.2# L-80 STL / TCII 2935' 8925' 8481'ss 11860' 8990'ss 163 sx Class 'G' x z-~/s" / 6.16# g, PRESE NT WELL CONDITION S UMMARY (To be completed far Redrill and Re-entry Operations) Total Depth MD (ft): 9850' Total Depth TVD (ft): 9094' Plugs (measured): None Effective Depth MD (ft): 9827' Effective Depth TVD (ft): 9087' Junk (measured): None asing Length ize Cement Volume MD TVD Conductor /Structural 110' 20" 260 sx Arcticset A rox. 110' 110' Surface 3613' 10-3/4" 1140 sx CS III 375 sx'G' 140 sx CS II 3648' 3638' Intermediate Prod ion 9792' 7-5l8" 490 sx Class'G' 9827' 9087' Liner Perforation Depth MD (ft): 9685' - 9715' Perforation Depth TVD (ft): 9044' - 9055' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Charles Reynolds, 564-5480 Printed Name Jo Mc Ile Title Engineering Team Leader C~ Prepared By Name/Number: Si nature Phone 564-4711 Date / /p Terrie Hubble, 564-4628 .Commission Use Onl Permit T dl Number: O~'~'y9 API Number: 50-029-22563-01-00 Permit Appr val See cover letter for Date: other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me_th/ane, gas hydrates, or gas contained shales: Samples Req'd: ^ Yes L+1 No Mud Log Req'd: ^ Yes ~No HZS Measures: I~Yes ^ No Directional Survey Req'd: Yes ^ No Other: 3a~QS ~ Q~Q ~S~ o APPROVED BY THE COMMISSION Date ,COMMISSIONER Forr~i 10-4f51 Reviled 12/2005_ ~ I ~ ~ ~ ~ ~ ~ Submit In Duplicate 111 BPXA Prudhoe Bay E-36A CTD Sidetrack September 10, 2008 CTD Sidetrack Summary Pre-Rig Work: (Scheduled to begin on September 15, 2008) 1. Dummy GLV's 2. MIT-IA, -OA 3. PPPOT-T, -IC 4. Run SCMT log from TD (Fill ~ 9,722') to 4-1/2" TBG tail @ 8,960' 5. Drift with dummy whipstock to 9,400' 6. Mill XN at 8,948' to 3.80" with left handed motor, mill. 7. PT MV, SV, WV 8. Bleed gas lift and production flowlines down to zero and blind flange. 9. Remove well house, level pad by Rig P&A and Sidetrack Operations: (Scheduled to begin on December 1, 2008 using Nordic rig 2) 1. MIRU Nordic Rig 2 2. NU 7-1/16" CT Drilling BOPE and test. 3. Pump ~28 bbl cement to P&A existing perfs (27.4 bbl from WS setting depth to PBTD, 22.6 bbls to last tag) 4. Set Baker throu h tubin whi stock at 2 ' 5. Mill 3.8"" window through ' . Sl``` cck~•~ ~ ~~~ w f ~ 6. Drill build and lateral section to 11,860'. 7. Run and cement a 3-1/2" x 3-3/16" x 2-7/8" L-80 liner string. 8. Make a cleanout run with mill, motor and SWS GR-CNL logging tool. 9. Perforate well. 10. FP well to 2000' with diesel. 11. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 12. RDMO Nordic 2. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.125" (bi-center bits used) Casing Program: fully cemented liner • 3-1/2", L-80 9.3# STL 8,925' - 8,955' and • 3-3/16", L-80 6.2# TCII 8,955' and - 10,900' and • 2-7/8", L-80 6.16# STL 10,900'md - 11,860' and • A minimum of 33.7 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9,150' Existing casinq/tubinp Information 13-3/8", L-80 72#, Burst 5380, collapse 2670 psi 9-5/8", L-80, 47# Burst 6870, collapse 4750 7.625", L-80 29.7#, Burst 6890, collapse 4790 psi 4-1/2", 13-CR 12.6#, Burst 8430, collapse 7500 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90 deg at 10,584. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line - 4,200 ft. • Distance to nearest well within pool - 764 ft. (E-04 C~ 9,950') Logging • MW D directional, Resistivity and Gamma Ray will be run over all of the open hole section. • Cased hole MCNUGR/CCL will be run. Hazards • The maximum recorded H2S level on E pad was 20 ppm on well E-25. • One planned fault crossing, calculated risk of lost circulation low. Reservoir Pressure • The reservoir pressure on E-36A is expected to be 3,423 psi at 8,800' TVDSS. (7.48 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,543 psi. C.R.Reynolds CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble E ~ :RON 4" SM CR .LHEAD = 3-5re3" SM FMC _.._...__....._....._........__.........B AI(ER 'UATOR _ EIEV = 63.4' ELEV = 34.4' ~= 1050' :-Ankle =..__..._...74 ~_ 9784'. am MD = 9348' im TVr) = RRnfM S.R D-314" CSG, 45.SaK, NT-80, ID = 9.953" Minimum ID ~ 3.725" ~ 8948' 4-1l2" HES XN NIPPLE SAF NOTES: 2197" H4-1 E2" OTIS Hx0 SSSVN NIP, ~ = 3.813" 1._J GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4830 6265 4812 6174 12 23 CA CA DMY DMY BK BK 0 0 02129AD8 021291018 4-912" HES 7(NIP, ID = 3.813" 897~- -i7-518" x 4-1 @" BKR S3 PKR, ID = 3.875" $937' $94~ 4-112" HES }(NIP, ID = 3.813" 4-1l2" HES }(N NIP, ID = 3.725" 14-1C2" TBG.12.6#. L-80..0152 bnf. ID = 3.958" I 8960' ~4-1 t2" 11Vl.EG, ID = 4.000" ~ 8955' ELMD TT LOGGED 10104/95 PERFORATION SUMMARY REF LOG: MUW OR ON 06/30195 ANGLE AT TOP PERF: 69' (3~ 9685' Note: Refer to Production DB for historical perf data SIZE SPF MITERVAL Opnl5ga DATE 3-318" 4 9685 - 9715 O O7M 2195 7-518" CSO, 29.7*, L-~ NSCC, .0459 bnf. ID = 6.675" I TD I DATE REV BY COMMENTS DATE REV BY COMMENTS 071061!6 Ot'tlGIMAL COMPLETION 08110AD1 RNJfP CORRECTIONS 09M 7103 CMO/fLP PERF ANGLE CORRECTION 03109808 DAVIPJC GLV CAO (02I291~) PRUDHOE BAY UNIT WELL: E-36 PEIRtMIT No: '1950730 API No: 50-029-22563-00 SEC 6, T11 N, R14E,1705' FNL 8 882' BP ExpbraRion (Alaskay TREE _ :RON 4" 5M CR WELLHEAD = ..................................... 3-518" 5M FMC ........................................ ACTUATOR = BAKER ..................................... I(B. ELEV = . ........................................ 63.4' . .. .................. ............................... ..... BF. ELEV = ............. .. .... 34.4' ..................................... KOP = ........................................ 1050' ..................................... Max Angle..= ...... ........................................ ..........74. ...9784' Datum MD = 9348' ..................................... natum Tvn = ........................................ a3snm Ss 0-3I4" CSG, 45.5#, NT-80, ID = 9.953" ~~ ~ ~ 5AF OTES: Proposed CTD Sidetrack 2797' ~~4-1 r2" OTIS HXO SSSVN NIP, tD = 3.813" Minimum ID ~ 3.725" ~ 8948' 4-112" HES }(N NIPPLE GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4830 6265 4812 6174 12 23 CA CA DMY DMY Btt Btt 0 0 02i19I08 02l29N8 $9U2' ~4-1 I2" HES X NIP, ID = 3.813" _ $974' 7-518" x 4-1 l2" BI(R S3 PICR, ID = 3.875" 918e1m Baker KB Liner Top Packer ID = 2.375" 8925e1m Liner Top $937' 4-1 !2" HES X NIP, ID = 3.813" 8948' 4-1 C2" HES XN NIP, IDmilled to = 3.80" ~ 4-1 l2" TBG,12.6#, L-80, .0152 bpf, ID = 3.958" ~ w hipstock 9230' PERFORATION SUMMARY REF LOG: MvVD GR ON O6l30P95 ANGLE AT TOP PERF: 69' ~ 9685' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSgz DATE 3-3~6" 4 9685 - 9715 0 07M 21'95 7-518" CSG, 29.7#, L-80 NSCC, .0459 bpf. ID = 6.875" WLEG, ID = 4.000" TT LOGGED 10I04P95 9150' Toc 70900' 3.311E x 2-713 X-over I 3.3116" X 2-7lS" cmi'ed and perfedl DATE REV BY COMMENTS DATE REV BY COMMENTS 07/05/95 OWGINAL COMPLETION 08MON1 RNITP CORRECTIONS 09M 1A03 CMO/fLP PERF ANGLE CORRECTION 03rD9N8 DAVrPJC GLV CIO (02f29ro8y 07f28N8 MSE PROPOSED CTD SIDETRACK TD I-i 9850' PRUDHOE BAY UNIT WELL: E-36A PERMIT No: API No: 50-029-22563-01 i11 N, R14E,1705' FNL 8882' FEL BP Exploration (Alsskay by ~ BP Alaska M $ Baker Hu hes INTEQ Planning Report 1NTE g Q Company: BP Amoco Date: 8/27/2008 Time: 11:15:51 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) References Well`. E-36, True North Si e: PB f Pad Vertical (TVI)) Reference: 57 :36 6/1 2/1995 00'00 64.1 Well: E-36 Section (VS) Reference: Well {O.OON;O.OOE,60.OOAzi) Wellpath: Plan 3, E-36A Survey Calculation Method:. Minimum Curvature Dbc Sybase Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 192 7 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB E Pad TR-11-14 UNITED STATES :North Sl ope Site Position: Northing: 5973160 .88 ft Latitude: 70 19 59.134 N From: Map Easting: 662538 .97 ft Longitude: 148 40 53.054 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.24 deg Well: E-36 Slot Name: 36 E-36 Well Position: +N/-S 2154.64 ft Northing: 5975349 .76 ft Latitude: 70 20 20.323 N +E/-W 1610.54 ft Easting : 664102 .33 ft Longitude: 148 40 6.013 W Position Uncertainty: 0.00 ft Wellpath: Plan 3, E-36A Drilled From: E-36 Tie-on Depth: 9223.86 ft Current Datum: 57:36 6/12/1995 00:00 Height 64 .10 ft Above System Datum: Mean Sea Level Magnetic Data: 8/26/2008 Declination: 23.09 deg Field Strength: 57682 nT Mag Dip Angle: 80.95 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 34.10 0.00 0.00 60.00 Plan: Plan 3 Date Composed: 8/26/2008 Version: 6 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <---- Latitude ----> <--- Longitude ----> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip.. Dir. ft ft ft ft ft E-36A Polygon 64.10 2329.60 -1536.83 5977645.00 662515.00 70 20 43.233 N 148 40 50.915 W -Polygons 64.10 2329.60 -1536.83 5977645.00 662515.00 70 20 43.233 N 148 40 50.915 W -Polygon 2 64.10 2461.04 226.60 5977815.00 664275.00 70 20 44.527 N 148 39 59.392 W -Polygon 3 64.10 2726.55 207.40 5978080.00 664250.00 70 20 47.138 N 148 39 59.952 W -Polygon 4 64.10 2687.97 -543.68 5978025.00 663500.00 70 20 46.759 N 148 40 21.898 W -Polygon 5 64.10 2640.31 -1565.03 5977955.00 662480.00 70 20 46.288 N 148 40 51.741 W E-36A Faults 64.10 2175.90 -2055.35 5977480.00 662000.00 70 20 41.720 N 148 41 6.064 W -Polygons 64.10 2175.90 -2055.35 5977480.00 662000.00 70 20 41.720 N 148 41 6.064 W -Polygon 2 64.10 2215.56 -1354.27 5977535.00 662700.00 70 20 42.111 N 148 40 45.580 W -Polygon 3 64.10 2337.56 383.94 5977695.00 664435.00 70 20 43.312 N 148 39 54.795 W -Polygon 4 64.10 2215.56 -1354.27 5977535.00 662700.00 70 20 42.111 N 148 40 45.580 W E-36A Fault2 64.10 2763.93 -1957.45 5978070.00 662085.00 70 20 47.503 N 148 41 3.208 W -Polygonl 64.10 2763.93 -1957.45 5978070.00 662085.00 70 20 47.503 N 148 41 3.208 W -Polygon 2 64.10 2774.34 -1061.95 5978100.00 662980.00 70 20 47.607 N 148 40 37.042 W -Polygon 3 64.10 2808.28 -556.05 5978145.00 663485.00 70 20 47.942 N 148 40 22.260 W -Polygon 4 64.10 2774.34 -1061.95 5978100.00 662980.00 70 20 47.607 N 148 40 37.042 W E-36A Fault3 64.10 3005.58 -886.83 5978335.00 663150.00 70 20 49.882 N 148 40 31.926 W -Polygonl 64.10 3005.58 -886.83 5978335.00 663150.00 70 20 49.882 N 148 40 31.926 W -Polygon 2 64.10 3028.50 -106.09 5978375.00 663930.00 70 20 50.108 N 148 40 9.112 W E-36A Targetl 9054.10 2417.14 -1331.85 5977737.00 662718.00 70 20 44.094 N 148 40 44.926 W E-36A Targetl 9054.10 2535.18 -6.85 5977884.00 664040.00 70 20 45.256 N 148 40 6.213 W by ~ BP Alaska ~ sus Baker Hu hes INTEQ Plannin Re ort g g P INTEQ Company: $P Amoco Date: 8/27/2008 Time: T1 :15:51 Page: 2' Field: P rudhoe Bay Co-ordinate(NE) Reference: WeII: E-36, True N orth': Site: P B E Pad Vertical{TVD) Reference: 57:36 6/12/1995 00:00..64.1 Well: E -36 Section (VS) Reference: Wel((O.OON,O.OOE ,60.OOAzi) Wellpaths P lan 3, E-36A Survey Calculation Method; Minimum Cuniature Dh: Sybase Annotation MD TVD ft ft 9223.86 8781.41 TIP 9230.00 8785.82 KOP 9250.00 8799.91 End of 9 Deg per 100' DLS 9474.00 8904.78 4 9549.00 8920.59 5 9574.00 8925.77 6 9924.00 9006.09 7 10174.00 9041.29 8 10584.29 9054.10 End of 16 Deg per 100' DLS 10774.00 9054.10 10 11027.00 9054.10 11 11227.00 9054.10 12 11477.00 9054.10 13 11727.00 9054.10 14 11860.00 0.00 TD Plan Section Information MD Incl Azim TVD +N/-S +FJ-W DLS Build Turn TFO .Target. ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 9223.86 43.80 316.30 8781.41 1584.24 -1125.60 0.00 0.00 0.00 0.00 9230.00 44.33 316.22 8785.82 1587.32 -1128.55 8.68 8.63 -1.30 353.98 9250.00 46.10 315.79 8799.91 1597.53 -1138.41 9.00 8.87 -2.17 350.00 9474.00 77.74 296.21 8904.78 1707.32 -1298.13 16.00 14.13 -8.74 326.00 9549.00 78.02 283.94 8920.59 1732.43 -1366.86 16.00 0.36 -16.36 270.00 9574.00 78.05 288.03 8925.77 1739.17 -1390.37 16.00 0.12 16.36 90.00 9924.00 77.60 345.43 9006.09 1976.80 -1614.27 16.00 -0.13 16.40 97.00 10174.00 86.82 24.78 9041.29 2218.16 -1591.75 16.00 3.69 15.74 80.00 10584.29 90.00 90.38 9054.10 2426.01 -1264.11 16.00 0.77 15.99 88.56 10774.00 90.00 67.62 9054.10 2461.96 -1079.11 12.00 0.00 -12.00 270.00 11027.00 90.00 97.98 9054.10 2493.30 -831.03 12.00 0.00 12.00 90.00 11227.00 90.00 73.98 9054.10 2507.23 -632.98 12.00 0.00 -12.00 270.00 11477.00 90.00 103.98 9054.10 2511.63 -385.86 12.00 0.00 12.00 90.00 11727.00 90.00 73.98 9054.10 2516.03 -138.75 12.00 0.00 -12.00 270.00 11860.00 90.00 89.94 9054.10 2534.57 -7.48 12.00 0.00 12.00 90.00 Survey MD Incl Azim SS TVD N/S E/W MapN MapE bLS VS TFO Too ft deg deg ft ft ft ft ft deg/1-00ft ft deg 9223.86 43.80 316.30 8717.31 1584.24 -1125.60 5976908.87 662942.41 0.00 -182.68 0.00 MWD 9225.00 43.90 316.29 8718.13 1584.81 -1126.15 5976909.43 662941.85 8.68 -182.87 353.98 MWD 9230.00 44.33 316.22 8721.72 1587.32 -1128.55 5976911.89 662939.39 8.68 -183.70 353.99 MWO 9250.00 46.10 315.79 8735.81 1597.53 -1138.41 5976921.88 662929.31 9.00 -187.13 350.00 MWD 9275.00 49.46 312.84 8752.61 1610.45 -1151.67 5976934.51 662915.78 16.00 -192.14 326.00 MWD 9300.00 52.88 310.19 8768.28 1623.35 -1166.25 5976947.08 662900.92 16.00 -198.33 327.98 MWD 9325.00 56.36 307.76 8782.76 1636.16 -1182.10 5976959.54 662884.79 16.00 -205.65 329.65 MWD 9350.00 59.88 305.52 8795.96 1648.82 -1199.13 5976971.82 662867.49 16.00 -214.07 331.05 MWD 9375.00 63.43 303.44 8807.83 1661.27 -1217.27 5976983.87 662849.08 16.00 -223.55 332.23 MWD 9400.00 67.02 301.48 8818.30 1673.44 -1236.42 5976995.62 662829.67 16.00 -234.05 333.22 MWD 9425.00 70.63 299.63 8827.33 1685.29 -1256.49 5977007.03 662809.35 16.00 -245.51 334.04 MWD 9450.00 74.25 297.85 8834.88 1696.74 -1277.39 5977018.02 662788.21 16.00 -257.88 334.71 MWD 9474.00 77.74 296.21 8840.68 1707.32 -1298.13 5977028.14 662767.24 16.00 -270.55 335.25 MWD 9475.00 77.74 296.05 8840.89 1707.75 -1299.01 5977028.55 662766.35 16.00 -271.10 270.00 MWD 9500.00 77.78 291.95 8846.20 1717.69 -1321.32 5977038.00 662743.83 16.00 -285.45 270.03 MWD 9525.00 77.87 287.86 8851.47 1726.01 -1344.29 5977045.81 662720.68 16.00 -301.19 270.90 MWD 9549.00 78.02 283.94 8856.49 1732.43 -1366.86 5977051.74 662697.98 16.00 -317.52 271.77 MWD 9550.00 78.02 284.10 8856.69 1732.67 -1367.81 5977051.96 662697.03 16.00 -318.22 90.00 MWD 9574.00 78.05 288.03 8861.67 1739.17 -1390.37 5977057.96 662674.34 16.00 -334.51 89.97 MWD 9575.00 78.03 288.19 8861.88 1739.47 -1391.30 5977058.24 662673.40 16..00 -335.16 97.00 MWD ep ~ BP Alaska ~ ~ Baker Hu hes INTEQ Plannin Re ort g g l~ INTEQ Company: BP Amoco Date: 8/27/2008 Time: 11:15:51 Page: 3- Field: Pru dhoe Bay Co-ordnate(NE) lteferencec Well; E -36, True North Site: PB E Pad Vertical (TVD) Reference: 57:36 $/12/1995 00;0064.1 Well: E-3 (i Section (VS) Reference: Well.(O.OON,O.OOE,60.OOAzi} WellpathE Plan 3, E-36A Survey Calculation Methodq Minimu m Curvatu re Db: Sybase Survey MI) Incl Azim SS TVD N/S E/W MapN MapE bLS VS TFO Too ft deg deg ft ft ft ft ft deg/100ft - ft deg 9600.00 77.57 292.26 8867.17 1747.91 -1414.22 5977066.18 662650.30 16.00 -350.79 96.97 MWD 9625.00 77.18 296.34 8872.63 1757.95 -1436.45 5977075.73 662627.85 16.00 -365.03 96.11 MWD 9650.00 76.84 300.43 8878.26 1769.52 -1457.88 5977086.83 662606.18 16.00 -377.80 95.21 MWD 9675.00 76.58 304.53 8884.01 1782.59 -1478.40 5977099.44 662585.38 16.00 -389.04 94.29 MWD 9700.00 76.38 308.64 8889.85 1797.07 -1497.91 5977113.49 662565.56 16.00 -398.70 93.35 MWD 9725.00 76.24 312.75 8895.77 1812.90 -1516.32 5977128.92 662546.80 16.00 -406.73 92.39 MWD 9750.00 76.18 316.87 8901.73 1830.01 -1533.55 5977145.64 662529.21 16.00 -413.09 91.42 MWD 9775.00 76.18 320.99 8907.71 1848.31 -1549.49 5977163.58 662512.87 16.00 -417.75 90.43 MWD 9800.00 76.26 325.11 8913.67 1867.70 -1564.08 5977182.66 662497.86 16.00 -420.69 89.45 MWD 9825.00 76.40 329.22 8919.58 1888.11 -1577.25 5977202.77 662484.25 16.00 -421.89 88.47 MWD 9850.00 76.61 333.33 8925.42 1909.42 -1588.93 5977223.82 662472.10 16.00 -421.35 87.50 MWD 9875.00 76.88 337.43 8931.15 1931.54 -1599.07 5977245.71 662461.49 16.00 -419.07 86.54 MWD 9900.00 77.22 341.52 8936.76 1954.35 -1607.61 5977268.32 662452.45 16.00 -415.06 85.60 MWD 9924.00 77.60 345.43 8941.99 1976.80 -1614.27 5977290.62 662445.30 16.00 -409.60 84.68 MWD 9925.00 77.63 345.59 8942.20 1977.75 -1614.51 5977291.56 662445.04 16.00 -409.34 80.00 MWD 9950.00 78.36 349.62 8947.41 2001.62 -1619.76 5977315.32 662439.27 16.00 -401.94 79.97 MWD 9975.00 79.14 353.62 8952.29 2025.88 -1623.33 5977339.48 662435.16 16.00 -392.91 79.13 MWD 10000.00 79.97 357.59 8956.82 2050.38 -1625.22 5977363.94 662432.75 16.00 -382.29 78.35 MWD 10025.00 80.85 1.55 8960.98 2075.03 -1625.40 5977388.58 662432.02 16.00 -370.12 77.63 MWD 10050.00 81.77 5.49 8964.76 2099.69 -1623.88 5977413.26 662433.00 16.00 -356.48 76.97 MWD 10075.00 82.74 9.41 8968.13 2124.25 -1620.67 5977437.88 662435.67 16.00 -341.42 76.37 MWD 10100.00 83.73 13.31 8971.08 2148.58 -1615.78 5977462.32 662440.03 16.00 -325.02 75.84 MWD 10125.00 84.75 17.20 8973.59 2172.57 -1609.24 5977486.45 662446.05 16.00 -307.35 75.38 MWD 10150.00 85.80 21.07 8975.65 2196.11 -1601.07 5977510.15 662453.69 16.00 -288.52 74.99 MWD 10174.00 86.82 24.78 8977.19 2218.16 -1591.75 5977532.40 662462.53 16.00 -269.41 74.67 MWD 10175.00 86.83 24.94 8977.25 2219.07 -1591.33 5977533.32 662462.93 16.00 -268.59 88.56 MWD 10200.00 86.94 28.94 8978.61 2241.32 -1580.02 5977555.81 662473.75 16.00 -247.68 88.55 MWD 10225.00 87.06 32.95 8979.92 2262.73 -1567.18 5977577.49 662486.11 16.00 -225.86 88.33 MWD 10250.00 87.20 36.95 8981.17 2283.19 -1552.88 5977598.26 662499.96 16.00 -203.24 88.12 MWD 10275.00 87.35 40.95 8982.36 2302.60 -1537.19 5977618.01 662515.23 16.00 -179.94 87.92 MWD 10300.00 87.51 44.95 8983.48 2320.88 -1520.17 5977636.65 662531.84 16.00 -156.07. 87.73 MWD 10325.00 87.69 48.95 8984.53 2337.93 -1501.93 5977654.10 662549.71 16.00 -131.74 87.55 MWD 10350.00 87.88 52.95 8985.50 2353.66 -1482.53 5977670.25 662568.75 16.00 -107.08 87.39 MWD 10375.00 88.08 56.95 8986.38 2368.01 -1462.08 5977685.04 662588.88 16.00 -82.19 87.23 MWD 10400.00 88.28 60.94 8987.18 2380.90 -1440.68 5977698.39 662610.00 16.00 -57.22 87.09 MWD 10425.00 88.50 64.94 8987.88 2392.26 -1418.43 5977710.24 662631.99 16.00 -32.26 86.96 MWD 10450.00 88.72 68.93 8988.48 2402.05 -1395.44 5977720.53 662654.76 16.00 -7.46 86.85 MWD 10475.00 88.95 72.93 8988.99 2410.21 -1371.82 5977729.21 662678.19 16.00 17.08 86.75 MWD 10500.00 89.19 76.92 8989.40 2416.71 -1347.69 5977736.23 662702.17 16.00 41.23 86.67 MWD 10525.00 89.43 80.92 8989.70 2421.52 -1323.16 5977741.57 662726.59 16.00 64.87 86.61 MWD 10550.00 89.67 84.91 8989.90 2424.60 -1298.36 5977745.20 662751.32 16.00 87.89 86.56 MWD 10575.00 89.91 88.90 8989.99 2425.95 -1273.40 5977747.09 662776.24 16.00 110.18 86.53 MWD 10584.29 90.00 90.38 8990.00 2426.01 -1264.11 5977747.35 662785.52 16.00 118.25 86.51 MWD 10600.00 90.00 88.50 8990.00 2426.16 -1248.40 5977747.85 662801.22 12.00 131.93 270.00 MWD 10625.00 90.00 85.50 8990.00 2427.47 -1223.44 5977749.70 662826.15 12.00 154.21 270.00 MWD 10650.00 90.00 82.50 8990.00 2430.08 -1198.58 5977752.86 662850.94 12.00 177.04 270.00 MWD 10675.00 90.00 79.50 8990.00 2433.99 -1173.89 5977757.31 662875.54 12.00 200.38 270.00 MWD 10700.00 90.00 76.50 8990.00 2439.19 -1149.44 5977763.04 662899.87 12.00 224.15 270.00 MWD 10725.00 90.00 73.50 8990.00 2445.66 -1125.29 5977770.04 662923.87 12.00 248.30 270.00 MWD 10750.00 90.00 70.50 8990.00 2453.39 -1101.52 5977778.28 662947.46 12.00 272.75 270.00 MWD 10774.00 90.00 67.62 8990.00 2461.96 -1079.11 5977787.34 662969.68 12.00 296.45 270.00 MWD 10775.00 90.00 67.74 8990.00 2462.34 -1078.18 5977787.75 662970.60 12.00 297.44 90.00 MWD 10800.00 90.00 70.74 8990.00 2471.20 -1054.81 5977797.11 662993.77 12.00 322.11 90.00 MWD by ~ BP Alaska ~ r Baker Hu hes INTEQ Plannin Re ort g g P INTEQ Company:. BP Amoco Date: 8/27/2008 Time: 11:15:51 Page: 4 .Field:.. Prudhoe Bay Co-ordinate(NE) Reference: Well: E -36, True North. Site: PB E Pad Vertical (TVl)) Reference: 57:36 6/12/1995 00:00:64.1 Well: E-3 6 Section (VS) Reference: WeIP (O .OON,O.OOE,60.OOAzi) ' - Wellpath: Plan 3, E-36A Survey. Calculation Method: Minimu m Curvatu re Db: Sybase Survey MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too ft deg deg ft ft ft ft ft deg/100ft ft. deg 10825.00 90.00 73.74 8990.00 2478.83 -1031.00 5977805.26 663017.40 12.00 346.54 90.00 MWD 10850.00 90.00 76.74 8990.00 2485.20 -1006.83 5977812.15 663041.43 12.00 370.66 90.00 MWD 10875.00 90.00 79.74 8990.00 2490.29 -982.36 5977817.78 663065.78 12.00 394.40 90.00 MWD 10900.00 90.00 82.74 8990.00 2494.10 -957.65 5977822.13 663090.40 12.00 417.70 90.00 MWD 10925.00 90.00 85.74 8990.00 2496.61 -932.78 5977825.18 663115.20 12.00 440.49 90.00 MWD 10950.00 90.00 88.74 8990.00 2497.81 -907.81 5977826.93 663140.14 12.00 462.72 90.00 MWD 10975.00 90.00 91.74 8990.00 2497.71 -882.81 5977827.37 663165.13 12.00 484.31 90.00 MWD 11000.00 90.00 94.74 8990.00 2496.30 -857.86 5977826.51 663190.11 12.00 505.22 90.00 MWD 11025.00 90.00 97.74 8990.00 2493.58 -833.01 5977824.34 663215.01 12.00 525.38 90.00 MW D 11027.00 90.00 97.98 8990.00 2493.30 -831.03 5977824.11 663217.00 12.00 526.96 90.00 MW D 11050.00 90.00 95.22 8990.00 2490.66 -808.18 5977821.96 663239.89 12.00 545.43 270.00 MWD 11075.00 90.00 92.22 8990.00 2489.04 -783.24 5977820.89 663264.87 12.00 566.22 270.00 MWD 11100.00 90.00 89.22 8990.00 2488.73 -758.24 5977821.12 663289.86 12.00 587.71 270.00 MWD 11125.00 90.00 86.22 8990.00 2489.72 -733.26 5977822.66 663314.81 12.00 609.84 270.00 MWD 11150.00 90.00 83.22 8990.00 2492.02 -708.37 5977825.51 663339.64 12.00 632.54 270.00 MWD 11175.00 90.00 80.22 8990.00 2495.62 -683.64 5977829.65 663364.29 12.00 655.76 270.00 MW D 11200.00 90.00 77.22 8990.00 2500.51 -659.12 5977835.07 663388.69 12.00 679.44 270.00 MW D 11225.00 90.00 74.22 8990.00 2506.68 -634.90 5977841.77 663412.77 12.00 703.50 270.00 MW D 11227.00 90.00 73.98 8990.00 2507.23 -632.98 5977842.36 663414.68 12.00 705.44 270.00 MWD 11250.00 90.00 76.74 8990.00 2513.04 -610.72 5977848.66 663436.80 12.00 727.62 90.00 MWD 11275.00 90.00 79.74 8990.00 2518.13 -586.25 5977854.28 663461.15 12.00 751.36 90.00 MWD 11300.00 90.00 82.74 8990.00 2521.94 -561.55 5977858.63 663485.77 12.00 774.66 90.00 MWD 11325.00 90.00 85.74 8990.00 2524.45 -536.67 5977861.68 663510.58 12.00 797.45 90.00 MW D 11350.00 90.00 88.74 8990.00 2525.65 -511.71 5977863.43 663535.51 12.00 819.68 90.00 MW D 11375.00 90.00 91.74 8990.00 2525.55 -486.71 5977863.88 663560.50 12.00 841.27 90.00 MW D 11400.00 90.00 94.74 8990.00 2524.14 -461.75 5977863.01 663585.48 12.00 862.18 90.00 MWD 11425.00 90.00 97.74 8990.00 2521.42 -436.90 5977860.84 663610.38 12.00 882.34 90.00 MWD 11450.00 90.00 100.74 8990.00 2517.41 -412.23 5977857.37 663635.14 12.00 901.70 90.00 MWD 11475.00 90.00 103.74 8990.00 2512.11 -387.80 5977852.60 663659.67 12.00 920.21 90.00 MW D 11477.00 90.00 103.98 8990.00 2511.63 -385.86 5977852.17 663661.63 12.00 921.65 90.00 MW D 11500.00 90.00 101.22 8990.00 2506.61 -363.42 5977847.64 663684.17 12.00 938.58 270.00 MW D 11525.00 90.00 98.22 8990.00 2502.39 -338.78 5977843.96 663708.90 12.00 957.81 270.00 MW D 11550.00 90.00 95.22 8990.00 2499.47 -313.95 5977841.58 663733.78 12.00 977.84 270.00 MWD 11575.00 90.00 92.22 8990.00 2497.84 -289.01 5977840.51 663758.75 12.00 998.63 270.00 MWD 11600.00 90.00 89.22 8990.00 2497.53 -264.01 5977840.74 663783.74 12.00 1020.12 270.00 MWD 11625.00 90.00 86.22 8990.00 2498.53 -239.03 5977842.28 663808.69 12.00 1042.25 270.00 MW D 11650.00 90.00 83.22 8990.00 2500.83 -214.14 5977845.13 663833.53 12.00 1064.96 270.00 MWD 11675.00 90.00 80.22 8990.00 2504.43 -189.41 5977849.27 663858.18 12.00 1088.18 270.00 MWD 11700.00 90.00 77.22 8990.00 2509.32 -164.89 5977854.69 663882.58 12.00 1111.86 270.00 MWD 11725.00 90.00 74.22 8990.00 2515.48 -140.67 5977861.39 663906.66 12.00 1135.92 270.00 MWD 11727.00 90.00 73.98 8990.00 2516.03 -138.75 5977861.98 663908.57 12.00 1137.86 270.00 MWD 11750.00 90.00 76.74 8990.00 2521.84 -116.49 5977868.27 663930.69 12.00 1160.04 90.00 MW D 11775.00 90.00 79.74 .8990.00 2526.94 -92.02 5977873.90 663955.04 12.00 1183.78 90.00 MWD 11800.00 90.00 82.74 8990.00 2530.75 -67.32 5977878.25 663979.65 12.00 1207.08 90.00 MWD 11825.00 90.00 85.74 8990.00 2533.25 -42.45 5977881.30 664004.46 12.00 1229.87 90.00 MWD 11850.00 90.00 88.74 8990.00 2534.46 -17.48 5977883.05 664029.40 12.00 1252.09 90.00 MWD 11860.00 90.00 89.94 8990.00 2534.57 -7.48 5977883.39 664039.39 12.00 1260.81 90.00 MW D • • BP Alaska vwur4Tx leans Men i~ !-iw ew]e]!N]O. aere.l lealP•ra - e _.. n..e r0. i]ia.w -- l.1.lae~w n~`aenur.z.wa w:eo Baton v.sinM. or1~ o~ it mid! w.w~ o.w e.w u1e REFERENCE INFORMATION Co-ordinate (NIE) Reference: Well Centre: E-3fi, Trua North Vertical (ND)) Reference: 57:36 6/12/1995 00'00 64.10 Section (VS)Reference'. Slot-36 (O.OON,O.OOE) Meawred Depth Reference: 57:36 fi/12/1995 00'.00 64.10 Calculation Method Minimum Curvature - we]wr slT.la ~ - c c av •wa . ec.e n... • ]..ar ~ -- it "ICErvo ial _,. T Plan: Plan 3 (E~6/Plan 3, E-36AI M AznnutM b Trw NoM Createtl By: BP Data: 8/2812008 ~~eh` NO1t` E3~ Chacketl: Dale: ~ Magwfic Flee ~ 8eergtl~'. Slfie2nT 8095° Dlp Argle. Dab: 8128/21108 oi,.., i mp.... ~. .. i.i .i i..n~eis~n Mo4et 60Yn2001 9C)1381-351 II L ~na~i. biflmveaxlson@in1 q m 3000 2900-' iZ _r 2300-~--~f l 2100 "' 2000 - -.. 1800- ~ 8400 8000 ~ - i-r• ' ' -K~- . ~ ~ E-12 E~.. . ~ s4oo _ L---- ~_ ~' g 1700 y -~ ~`F'_"_ \ 8100 3800 \ , 8 I -+ - ~ 1600 ~ ~ ~ \ _ _. _ _ 0100 .-_..~ii „ II .. JJ „ ~`„ II „ „ '-- E•t 70 E-110 ~ T ~- -'~ 8700 1 ~. - - ~, 7800 1500 _~_ 1~~ '-~-__.. .. `~ '~'~..,."'.'._ ]800 ~ ]U 1400- :. _ .. ,_ ., .. ~aoo -.-. >, saoo ~ -2600 -2500 •2400 -2300 -2200 -2100 -2000 -1900 -1800 -1700 -1600 -1500 -7400 -1300 -1200 -11 00 -1000 -900 -800 -700 fi00 -500 -400 -300 -200 -100 0 100 200 300 West(-)/East(+) [100ftlin] {+-- - I !-III llN TwYrLlf '- '-' h `_ ~aoo ~ ~h ~, ..T \ E-toofe•tool • WI:1.1. Utl'A1LS A1VT1-COLLISION SETCWGS `~`~'~""~' 1i"1''LLx +N,'-S +14-W hWnhing L•'uling I~IiluJe LnugituJe Slot IntePpolation MethodMD Interval: 25.(X1 ' nr nm...,. •Ime _'154.64 1(111.54 597534').76 664111333 70"~)^0.3?3N 14H"411'H6.1113W 3G Depth Range From: 9223.H6 To: IIH6U.00 ~ ~ymw+~~~~ Maximum Range: I3H2.5Y Reference: Plan: Plan 3 me 1~> ~ ~ ~ ~ 1,N / / i 1. ~ ~~ - ~~ ,' / ', /~ ~ ~~ ., i ~ ~ ~ ~ / ~,/ ~ /'~ 5. I ~' ~ ~ ~~ ~ ~% ~ ~ ~ .- i ~~~;~~I~~~,!ll ~~ii w ~~~ ~ ~ ~~~ ~ ~ ~ ti~ ~L ,n ~~ x , \ \~~ \ ~ ~, ~~~ ~ ~ ~~ ~ . ' \ ~ `\ + \~ ~ ` , ~ \ ~ ~\\ ~ ~ ~ ~~ ~~ ~~ ~ ~ ~' $ ~ \ . '~~ v~ v ~ ~ ,~ ~ ~ yf;~ a a~, \ Dr ,y ~~ ~ I '~ i~I~,~~I~II;~~I,~i~~~~~~~~,~ ~ ~` ,~iI~~II~~i i ~ ~ ~ ~ ~ ~ ~ - / ~ ! + ~ ; I ~ ~~ A ~ `' ~ ~ ~i '! ~ ~ `~ `~ o i ~ ~ / ~ ~"~s V ~ ~/ ~~~/ ~, ~~ ~ ~ ~ + ~ ~ ~ / ~~~ ~ ~s . l J ~~ , ~ \ - ~ ~~ / F i/ i i ~ ~ / / i / / ~ I~.,. s 1 Jcl ni.muln ~PFU~nl11IJ•91~*1'.nu~0.l~.nue x~P•.•u,~~lisll ink xl'NVIfY PAUt:XMI WELLYAIH UkfALLx U.plh Fm UeP1X T.• Xm1.1 PW 1„0l SNU_v-Sb{nl 9_-~.X6 ue6996 PLm.J. ruo~Fa Mwn r N.r u, ~N s. lbe l_1995x 99 w.19n cneXle ~A.-9 •6-w F,•~m NU LEGEND E-O4A (E-04A), Major Risk E-04 (E-04), Major Risk E-07 (E-07), Major Risk E-07 (E-O7A), Major Risk - E-07 (E-O7APB1), Major Risk - E-07 (E-O7APB2), Major Risk E-12 (E-12), Major Risk E-36 (E-36), Major Risk E-38 (E-38), Mayor Risk E-38PB1(E-38PB1),MajorRisk E-38PB2 (E-38PB2), Major Risk Plan 3, E-36A Plan 3 lx«1w P n. rHnlfA-36PI. fiU..l. 81,iUx by BAKER EQ NE1'TIUN UETAIL5 8.. MU In Ar{ TVU 'N-x •F.~W UIsE TFU~c VSu Tugcl 1 1)tlU 110.10 tl]M191 IStl124 -112500 1 -IBE 68 1{Jl 110 E2 9250 1X1 {6 IU 115]9 tl]tlS bl tl]Y991 IStl]3E ~IIEtl55 159]51 .IIltl 41 15 98 9UU lSU ml ~Ie]]U -1X]11 4 Y4]41N1 ]] ]J IYO EI X91N ]X I)U> l1 ~IEYtl II 10 W 110 W ~IIU 55 5 951Y IN 7N 112 ENl Y4 Y5]{1N1 >tl US 2XN Ul tlY1U.59 X915 ]t 1]11{1 -1100 tl0 1)111] ~119U.i] IM1W i]UW IOW 4UW -11].52 -1)451 t W~Il lxl ]]611 14541 91xW U9 IY]0 tlU -10111] IM1W 9]OYI -9119 M1U 10111.1X1 tlO NI E4 ]b 1115 N41Y 9111X1 9111X Y1HI I9 n1541U IIIN 10 ~I591 t5 2110111 -120{ 11 IOW tlUW 10 W tlX.56 0941 11X25 lu 10]]J 1x1 Y b]61 YU51 IU IMIYO ~IU]v ll IIW 1]U.W 19045 II IIU2t UU Y 9]YN 11 I I2I] Uu )19tl WSi IU W54.IU IY11 lU -Nll Ul 150) Il 611 Utl IEW WW 1110 2]U W 52090 ]0511 Il II{])INl IIII YM Y1154 IU 1511 M11 ~1tl580 11W YU.W Y2105 11 11]1]1X1 ]19tl IS IIN0U 00 txl tlY 94 YUSI.IU 905410 2516 u1 ~I1a15 25145] ~)ie 1]OW 12W 11l].tl0 116081 • ep ~ BP Alaska Anticollision Report . mar s"s INTEQ Company: BP Amoco Date: 8/28/2008 Times 09:37:41 Paget 1 Field: Prudhoe Bay Reference Site: PB E Pad Co-ordinate(NE) Reference: We1L• E-36, True North Reference Well: E-36 Vertical (TVD) Reference: 57:36 6/12/1995 00: 00 64.1 Reference Wellpath: Plan 3, E-36A Db: Orate GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are 'R[A'dd~eeells in thisOitihBipal Plan & PLANNED PROGRAM Interpolation Method : MD Inte rval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 9223.86 to 11860.00 ft Scan Method: Trav Cylinder North Maximum Radius: 1 382.59 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 8/27/2008 Validated: No Version: 0 Planned From To Survey Toolcode Tool Name ft ft 151.56 9223.86 1 : MWD -Stand ard (151.56-985 MWD MWD -Standard 9223.86 11860.00 Planned: Plan 3 V6 MWD MWD -Standard Casing Points MD TVD Diameter Hole Size Name ft ft in in 11860.00 9054.10 3.500 4.125 3.5 Summary <-----=------- Offset Wellpath ------ ----- a Reference Offset Ctr-Cte No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ff ft E-36,PIan 3, E-36A,PIa 9825.00 9825.00 0.00 138.79 -138.79 FAIL: Major Risk PB E Pad E-04A E-04A V3 1 0500.00 12250.00 1082.36 339.40 742.96 Pass: Major Risk PB E Pad E-04 E-04 V1 9950.00 9650.00 764.57 359.84 404.73 Pass: Major Risk PB E Pad E-07 E-07 V5 Out of range PB E Pad E-07 E-07A V2 Out of range PB E Pad E-07 E-07APB1 V1 Out of range PB E Pad E-07 E-07APB2 V1 Out of range PB E Pad E-12 E-12 V1 Out of range PB E Pad E-36 E-36 V1 9274.98 9275.00 0.64 180.20 -179.56 FAIL: Major Risk PB E Pad E-38 E-38 V1 Out of range PB E Pad E-38PB1 E-38P61 V1 Out of range PB E Pad E-38P62 E-38P62 V1 Out of range Site: Well: Rule Assigned: Major Risk Wellpath: E-36,PIa n 3, E-36A,PIan 3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go 'Allowable MD TVD MD TVD Ref Offset. TFO+A ZI TFO-HS Casing/IISUistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9223.86 8781.41 9223.86 8781.41 27.49 0.00 316.30 0.00 4.125 0.00 115.62 -115.62 FAIL 9225.00 8782.23 9225.00 8782.23 27.50 0.01 316.29 0.00 4.125 0.00 115.67 -115.67 FAIL 9250.00 8799.91 9250.00 8799.91 27.66 0.28 315.79 0.00 4.125 0.00 116.43 -116.43 FAIL 9275.00 8816.71 9275.00 8816.71 27.70 0.62 312.84 0.00 4.125 0.00 117.03 -117.03 FAIL 9300.00 8832.38 9300.00 8832.38 27.71 0.97 310.19 0.00 4.125 0.00 117.52 -117.52 FAIL 9325.00 8846.86 9325.00 8846.86 27.69 1.33 307.76 0.00 4.125 0.00 117.92 -117.92 FAIL 9350.00 8860.06 9350.00 8860.06 27.63 1.71 305.52 0.00 4.125 0.00 118.23 -118.23 FAIL 9375.00 8871.93 9375.00 8871.93 27.55 2.10 303.44 0.00 4.125 0.00 118.46 -118.46 FAIL 9400.00 8882.40 9400.00 8882.40 27.44 2.49 301.48 0.00 4.125 0.00 118.61 -118.61 FAIL 9425.00 8891.43 9425.00 8891.43 27.32 2.89 299.63 0.00 4.125 0.00 118.71 -118.71 FAIL 9450.00 8898.98 9450.00 8898.98 27.19 3.29 297.85 0.00 4.125 0.00 118.76 -118.76 FAIL 9475.00 8904.99 9475.00 8904.99 27.04 3.68 296.05 0.00 4.125 0.00 118.70 -118.70 FAIL 9500.00 8910.30 9500.00 8910.30 26.41 4.05 291.95 0.00 4.125 0.00 117.01 -117.01 FAIL 9525.00 8915.57 9525.00 8915.57 25.67 4.39 287.86 0.00 4.125 0.00 114.98 -114.98 FAIL 9550.00 8920.79 9550.00 8920.79 24.91 4.72 284.10 0.00 4.125 0.00 112.90 -112.90 FAIL 9575.00 8925.98 9575.00 8925.98 26.28 5.17 288.19 0.00 4.125 0.00 117.11 -117.11 FAIL 9600.00 8931.27 9600.00 8931.27 27.55 5.62 292.26 0.00 4.125 0.00 121.01 -121.01 FAIL 9625.00 8936.73 9625.00 8936.73 28.69 6.04 296.34 0.00 4.125 0.00 124.55 -124.55 FAIL 9650.00 8942.36 9650.00 8942.36 29.71 6.44 300.43 0.00 4.125 0.00 127.73 -127.73 FAIL 9675.00 8948.11 9675.00 8948.11 30.59 6.81 304.53 0.00 4.125 0.00 130.54 -130.54 FAIL by + BP Alaska Anticollision Report ~ s~R ~ Nuc;r~s LNTEQ Company: BP Amoco Date: 8/28/2008 Time: 09:37:41 Page: 2 Field: Prudhoe Bay Refereuce Site: PB E Pad Co-ordioate(NE) )teference: WeIL• E-36 True North Reference Well: E-36 Vertical (TVD) Reference: 57:36 6/12/1995 00: 00'64.1 Reference Wellpath; Plan 3, E-36A Db: Oraole " Site: Well: Rule Assigned: Major Risk Wellpath: E-36,PIan 3, E-36A,PIan 3 Inter-Site Error: 0.00 ft Reference Offset Semi-MajorAais Ctr-Ctr No-Go Allowable MD TVD MI) T~'D Ref . .Offset TFO+AZI TFO-HS CasinglE ISflistance Are$ Deviation. Warning ft ft ft ft ft ft deg deg in ft ft ft 9700.00 8953.95 9700.00 8953.95 31.32 7.15 308.64 0.00 4.125 0.00 132.96 -132.96 FAIL 9725.00 8959.87 9725.00 8959.87 31.91 7.46 312.75 0.00 4.125 0.00 134.98 -134.98 FAIL 9750.00 8965.83 9750.00 8965.83 32.35 7.72 316.87 0.00 4.125 0.00 136.58 -136.58 FAIL 9775.00 8971.81 9775.00 8971.81 32.64 7.95 320.99 0.00 4.125 0.00 137.76 -137.76 FAIL 9800.00 8977.77 9800.00 8977.77 32.77 8.13 325.11 0.00 4.125 0.00 138.50 -138.50 FAIL 9825.00 8983.68 9825.00 8983.68 32.75 8.28 329.22 0.00 4.125 0.00 138.79 -138.79 FAIL 9850.00 8989.52 9850.00 8989.52 32.58 8.37 333.33 0.00 4.125 0.00 138.63 -138.63 FAIL 9875.00 8995.25 9875.00 8995.25 32.25 8.42 337.43 0.00 4.125 0.00 138.01 -138.01 FAIL 9900.00 9000.86 9900.00 9000.86 31.77 8.43 341.52 0.00 4.125 0.00 136.92 -136.92 FAIL 9925.00 9006.30 9925.00 9006.30 31.14 8.39 345.59 0.00 4.125 0.00 135.36 -135.36 FAIL 9950.00 9011.51 9950.00 9011.51 30.37 8.31 349.62 0.00 4.125 0.00 133.34 -133.34 FAIL 9975.00 9016.39 9975.00 9016.39 29.46 8.18 353.62 0.00 4.125 0.00 130.86 -130.86 FAIL 10000.00 9020.92 10000.00 9020.92 28.41 8.01 357.59 0.00 4.125 0.00 127.95 -127.95 FAIL 10025.00 9025.08 10025.00 9025.08 27.24 7.80 1.55 0.00 4.125 0.00 124.63 -124.63 FAIL 10050.00 9028.86 10050.00 9028.86 25.96 7.56 5.49 0.00 4.125 0.00 120.93 -120.93 FAIL 10075.00 9032.23 10075.00 9032.23 24.56 7.28 9.41 0.00 4.125 0.00 116.89 -116.89 FAIL 10100.00 9035.18 10100.00 9035.18 23.07 6.98 13.31 0.00 4.125 0.00 112.55 -112.55 FAIL 10125.00 9037.69 10125.00 9037.69 21.50 6.66 17.20 0.00 4.125 0.00 107.96 -107.96 FAIL 10150.00 9039.75 10150.00 9039.75 19.87 6.32 21.07 0.00 4.125 0.00 103.19 -103.19 FAIL 10175.00 9041.35 10175.00 9041.35 18.20 5.98 24.94 0.00 4.125 0.00 98.32 -98.32 FAIL 10200.00 9042.71 10200.00 9042.71 16.45 5.65 28.94 0.00 4.125 0.00 93.31 -93.31 FAIL 10225.00 9044.02 10225.00 9044.02 14.70 5.32 32.95 0.00 4.125 0.00 88.29 -88.29 FAIL 10250.00 9045.27 10250.00 9045.27 12.99 5.03 36.95 0.00 4.125 0.00 83.41 -83.41 FAIL 10275.00 9046.46 10275.00 9046.46 11.41 4.79 40.95 0.00 4.125 0.00 78.90 -78.90 FAIL 10300.00 9047.58 10300.00 9047.58 10.08 4.62 44.95 0.00 4.125 0.00 75.12 -75.12 FAIL 10325.00 9048.63 10325.00 9048.63 9.16 4.54 48.95 0.00 4.125 0.00 72.60 -72.60 FAIL 10350.00 9049.60 10350.00 9049.60 8.78 4.57 52.95 0.00 4.125 0.00 71.69 -71.69 FAIL 10375.00 9050.48 10375.00 9050.48 8.90 4.72 56.95 0.00 4.125 0.00 72.30 -72.30 FAIL 10400.00 9051.28 10400.00 9051.28 9.47 4.98 60.94 0.00 4.125 0.00 74.23 -74.23 FAIL 10425.00 9051.98 10425.00 9051.98 10.42 5.33 64.94 0.00 4.125 0.00 77.32 -77.32 FAIL 10450.00 9052.58 10450.00 9052.58 11.69 5.74 68.93 0.00 4.125 0.00 81.39 -81.39 FAIL 10475.00 9053.09 10475.00 9053.09 13.21 6.21 72.93 0.00 4.125 0.00 86.16 -86.16 FAIL 10500.00 9053.50 10500.00 9053.50 14.87 6.71 76.92 0.00 4.125 0.00 91.39 -91.39 FAIL 10525.00 9053.80 10525.00 9053.80 16.60 7.23 80.92 0.00 4.125 0.00 96.84 -96.84 FAIL 10550.00 9054.00 10550.00 9054.00 18.36 7.77 84.91 0.00 4.125 0.00 102.37 -102.37 FAIL 10575.00 9054.09 10575.00 9054.09 20.11 8.31 88.90 0.00 4.125 0.00 107.87 -107.87 FAIL 10600.00 9054.10 10600.00 9054.10 19.83 8.48 88.50 0.00 4.125 0.00 107.28 -107.28 FAIL 10625.00 9054.10 10625.00 9054.10 18.38 8.47 85.50 0.00 4.125 0.00 103.16 -103.16 FAIL 10650.00 9054.10 10650.00 9054.10 16.98 8.51 82.50 0.00 4.125 0.00 99.18 -99.18 FAIL 10675.00 9054.10 10675.00 9054.10 15.65 8.61 79.50 0.00 4.125 0.00 95.44 -95.44 FAIL 10700.00 9054.10 10700.00 9054.10 14.44 8.76 76.50 0.00 4.125 0.00 92.05 -92.05 FAIL 10725.00 9054.10 10725.00 9054.10 13.40 8.95 73.50 0.00 4.125 0.00 89.14 -89.14 FAIL 10750.00 9054.10 10750.00 9054.10 12.56 9.19 70.50 0.00 4.125 0.00 86.88 -86.88 FAIL 10775.00 9054.10 10775.00 9054.10 12.04 9.46 67.74 0.00 4.125 0.00 85.54 -85.54 FAIL 10800.00 9054.10 10800.00 9054.10 12.81 9.82 70.74 0.00 4.125 0.00 88.12 -88.12 FAIL 10825.00 9054.10 10825.00 9054.10 13.72 10.18 73.74 0.00 4.125 0.00 91.10 -91.10 FAIL 10850.00 9054.10 10850.00 9054.10 14.72 10.54 76.74 0.00 4.125 0.00 94.37 -94.37 FAIL 10875.00 9054.10 10875.00 9054.10 15.80 10.90 79.74 0.00 4.125 0.00 97.86 -97.86 FAIL 10900.00 9054.10 10900.00 9054.10 16.92 11.26 82.74 0.00 4.125 0.00 101.49 -101.49 FAIL 10925.00 9054.10 10925.00 9054.10 18.07 11.61 85.74 0.00 4.125 0.00 105.20 -105.20 FAIL 10950.00 9054.10 10950.00 9054.10 19.23 11.95 88.74 0.00 4.125 0.00 108.94 -108.94 FAIL by ~ BP Alaska Anticollision Report ~ ~,.r INTEQ Company:.- BP Amoco Dste: 8/28/2008 Tiroe: 09:37:41 Page: 3 Field: Prudhoe Bay Reference Site: PB E Pad Co-ordinate(NE) Reference: WeIL E-36, True North Reference Well: E-36 Vertical (TVD) Reference: 57:36 611 2/1895 00: 00 64.1 Reference Wellpath:. Plan 3, E-36A Db: Oracle Site: Well: Rule Assigned: Major Risk Wellpath: E-36,PIan 3, E-36A,PIan 3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Ailovrable MD TW MD TVD Ref Offset TFO+AZI TFO-HS Casing/El~istance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 10975.00 9054.10 10975.00 9054.10 20.39 12.27 91.74 0.00 4.125 0.00 112.67 -112.67 FAIL 11000.00 9054.10 11000.00 9054.10 21.53 12.59 94.74 0.00 4.125 0.00 116.35 -116.35 FAIL 11025.00 9054.10 11025.00 9054.10 22.64 12.88 97.74 0.00 4.125 0.00 119.96 -119.96 FAIL 11050.00 9054.10 11050.00 9054.10 21.72 13.25 95.22 0.00 4.125 0.00 117.46 -117.46 FAIL 11075.00 9054.10 11075.00 9054.10 20.67 13.64 92.22 0.00 4.125 0.00 114.54 -114.54 FAIL 11100.00 9054.10 11100.00 9054.10 19.69 14.04 89.22 0.00 4.125 0.00 111.83 -111.83 FAIL 11125.00 9054.10 11125.00 9054.10 18.79 14.43 86.22 0.00 4.125 0.00 109.39 -109.39 FAIL 11150.00 9054.10 11150.00 9054.10 18.01 14.82 83.22 0.00 4.125 0.00 107.29 -107.29 FAIL 11175.00 9054.10 11175.00 9054.10 17.37 15.21 80.22 0.00 4.125 0.00 105.60 -105.60 FAIL 11200.00 9054.10 11200.00 9054.10 16.88 15.58 77.22 0.00 4.125 0.00 104.38 -104.38 FAIL 11225.00 9054.10 11225.00 9054.10 16.58 15.94 74.22 0.00 4.125 0.00 103.72 -103.72 FAIL 11250.00 9054.10 11250.00 9054.10 17.16 16.28 76.74 0.00 4.125 0.00 105.71 -105.71 FAIL 11275.00 9054.10 11275.00 9054.10 17.91 16.62 79.74 0.00 4.125 0.00 108.22 -108.22 FAIL 11300.00 9054.10 11300.00 9054.10 18.72 16.94 82.74 0.00 4.125 0.00 110.91 -110.91 FAIL 11325.00 9054.10 11325.00 9054.10 19.57 17.23 85.74 0.00 4.125 0.00 113.74 -113.74 FAIL 11350.00 9054.10 11350.00 9054.10 20.46 17.49 88.74 0.00 4.125 0.00 116.67 -116.67 FAIL 11375.00 9054.10 11375.00 9054.10 21.37 17.72 91.74 0.00 4.125 0.00 119.65 -119.65 FAIL 11400.00 9054.10 11400.00 9054.10 22.28 17.92 94.74 0.00 4.125 0.00 122.65 -122.65 FAIL 11425.00 9054.10 11425.00 9054.10 23.18 18.08 97.74 0.00 4.125 0.00 125.63 -125.63 FAIL 11450.00 9054.10 11450.00 9054.10 24.08 18.21 100.74 0.00 4.125 0.00 128.58 -128.58 FAIL 11475.00 9054.10 11475.00 9054.10 24.95 18.31 103.74 0.00 4.125 0.00 131.46 -131.46 FAIL 11500.00 9054.10 11500.00 9054.10 24.40 18.93 101.22 0.00 4.125 0.00 130.07 -130.07 FAIL 11525.00 9054.10 11525.00 9054.10 23.79 19.58 98.22 0.00 4.125 0.00 128.47 -128.47 FAIL 11550.00 9054.10 11550.00 9054.10 23.24 20.20 95.22 0.00 4.125 0.00 127.08 -127.08 FAIL 11575.00 9054.10 11575.00 9054.10 22.78 20.79 92.22 0.00 4.125 0.00 125.93 -125.93 FAIL 11600.00 9054.10 11600.00 9054.10 22.40 21.34 89.22 0.00 4.125 0.00 125.06 -125.06 FAIL 11625.00 9054.10 11625.00 9054.10 22.12 21.86 86.22 0.00 4.125 0.00 124.47 -124.47 FAIL 11650.00 9054.10 11650.00 9054.10 21.95 22.33 83.22 0.00 4.125 0.00 124.20 -124.20 FAIL 11675.00 9054.10 11675.00 9054.10 21.88 22.75 80.22 0.00 4.125 0.00 124.25 -124.25 FAIL 11700.00 9054.10 11700.00 9054.10 21.93 23.13 77.22 0.00 4.125 0.00 124.62 -124.62 FAIL 11725.00 9054.10 11725.00 9054.10 22.08 23.45 74.22 0.00 4.125 0.00 125.33 -125.33 FAIL 11750.00 9054.10 11750.00 9054.10 22.45 23.86 76.74 0.00 4.125 0.00 126.72 -126.72 FAIL 11775.00 9054.10 11775.00 9054.10 22.91 24.24 79.74 0.00 4.125 0.00 128.35 -128.35 FAIL 11800.00 9054.10 11800.00 9054.10 23.40 24.57 82.74 0.00 4.125 0.00 130.09 -130.09 FAIL 11825.00 9054.10 11825.00 9054.10 23.93 24.85 85.74 0.00 4.125 0.00 131.93 -131.93 FAIL 11850.00 9054.10 11850.00 9054.10 24.47 25.08 88.74 0.00 4.125 0.00 133.84 -133.84 FAIL Site: PB E Pad Well: E-04A Rule Assigned: Major Risk Wellpath: E-04A V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Gtr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in- ft ft ft 9650.00 8942.36 8500.00 7843.80 29.71 102.43 278.71 338.29 1213.18 182.71 1030.46 Pass 9656.82 8943.91 8525.00 7861.00 29.95 102.16 279.28 337.74 1202.05 184.54 1017.51 Pass 9665.46 8945.90 8550.00 7878.14 30.25 101.75 280.04 337.08 1191.37 186.56 1004.81 Pass 9675.00 8948.11 8575.00 7895.34 30.59 101.24 280.87 336.34 1181.01 188.75 992.26 Pass 9682.50 8949.85 8600.00 7912.61 30.81 100.79 281.40 335.64 1170.95 191.08 979.87 Pass 9690.88 8951.81 8625.00 7929.94 31.05 100.23 281.99 334.86 1161.19 193.55 967.64 Pass 9700.00 8953.95 8650.00 7947.35 31.32 99.57 282.66 334.02 1151.58 196.02 955.57 Pass 9707.43 8955.71 8675.00 7964.83 31.50 98.98 283.10 333.24 1142.10 198.52 943.58 Pass 9715.60 8957.64 8700.00 7982.38 31.69 98.29 283.61 332.40 1132.76 200.98 931.77 Pass by i BP Alaska Anticollision Report • ~c.r s ~s INTEQ Company: BP Amoco Date: 8/28/2008 Time: 09;37:41 Page: 4 .Field: Prudhoe Bay Reference Site: PB E Pad Co-ordinate(NE) Reference: Well: E-36, True North Reference Well: E-36 Vertical (TVD) Reference: 57:36 6/1:2/1995 00: 00.64.1 Reference Wellpat6: Plan 3, f-36A Db: OraGe Site: PB E Pad WeII: E-04A Rule Assigned: Major Risk Wellpath: E-04A V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Gtr-Ctr No-Go Allowable MD TVD MD- TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area peviaton Warning' ft ft ft ft ft ft deg deg in ft ft ft 9725.00 8959.87 8725.00 7999.94 31.91 97.43 284.25 331.50 1123.62 203.35 920.27 Pass 9731.79 8961.49 8750.00 8017.38 32.03 96.77 284.55 330.68 1114.91 205.93 908.98 Pass 9739.82 8963.40 8775.00 8034.69 32.17 95.95 284.98 329.79 1106.65 208.40 898.25 Pass 9750.00 8965.83 8800.00 8051.86 32.35 94.83 285.66 328.79 1098.87 210.59 888.28 Pass 9755.71 8967.20 8825.00 8069.01 32.42 94.18 285.75 327.94 1091.42 213.39 878.02 Pass 9763.49 8969.06 8850.00 8086.30 32.51 93.26 286.08 326.99 1084.14 215.86 868.28 Pass 9775.00 8971.81 8875.00 8103.73 32.64 91.80 286.85 325.86 1077.08 217.67 859.41 Pass 9775.00 8971.81 8900.00 8121.29 32.64 91.81 286.14 325.16 1070.18 221.63 848.56 Pass 9786.05 8974.45 8925.00 8138.99 32.70 90.33 286.81 324.00 1063.40 223.38 840.02 Pass 9793.36 8976.19 8950.00 8156.82 32.74 89.31 286.98 322.97 1056.75 225.79 830.96 Pass 9800.00 8977.77 8975.00 8174.79 32.77 88.35 287.06 321.95 1050.21 228.36 821.86 Pass 9807.67 8979.58 9000.00 8192.86 32.77 87.21 287.24 320.88 1043.83 230.47 813.36 Pass 9814.72 8981.25 9025.00 8210.85 32.76 86.12 287.34 319.81 1037.88 232.65 805.23 Pass 9825.00 8983.68 9050.00 8228.69 32.75 84.48 287.83 318.61 1032.46 233.79 798.66 Pass 9825.00 8983.68 9075.00 8246.38 32.75 84.50 287.02 317.79 1027.54 237.89 789.66 Pass 9835.55 8986.15 9100.00 8263.99 32.68 82.74 287.50 316.55 1023.13 238.64 784.49 Pass 9842.26 8987.72 9125.00 8281.64 32.63 81.60 287.48 315.42 1019.27 240.53 778.74 Pass 9850.00 8989.52 9150.00 8299.34 32.58 80.24 287.56 314.23 1015.95 242.02 773.93 Pass 9855.17 8990.71 9175.00 8317.08 32.51 79.32 287.28 313.10 1013.18 244.38 768.80 Pass 9861.39 8992.14 9200.00 8334.74 32.43 78.19 287.11 311.92 1011.12 246.20 764.92 Pass 9867.47 8993.54 9225.00 8352.25 32.35 77.06 286.91 310.71 1009.85 247.96 761.89 Pass 9875.00 8995.25 9250.00 8369.59 32.25 75.63 286.87 309.45 1009.40 248.98 760.42 Pass 9875.00 8995.25 9275.00 8386.79 32.25 75.66 285.87 308.45 1009.74 253.17 756.58 Pass 9884.92 8997.49 9300.00 8404.00 32.06 73.72 286.12 307.07 1010.46 252.72 757.75 Pass 9890.53 8998.75 9325.00 8421.26 31.95 72.62 285.82 305.85 1011.54 253.99 757.55 Pass 9900.00 9000.86 9350.00 8438.58 31.77 70.69 286.02 304.50 1012.97 253.16 759.82 Pass 9900.00 9000.86 9375.00 8455.92 31.77 70.72 285.00 303.48 1014.78 256.94 757.83 Pass 9906.76 9002.35 9400.00 8473.13 31.60 69.32 284.84 302.22 1017.38 257.03 760.36 Pass 9911.89 9003.47 9425.00 8490.20 31.47 68.26 284.47 301.01 1020.82 257.79 763.03 Pass 9916.86 9004.55 9450.00 8507.13 31.35 67.22 284.08 299.81 1025.07 258.47 766.60 Pass 9924.00 9006.09 9475.00 8523.97 31.17 65.68 283.96 298.53 1030.06 257.71 772.35 Pass 9924.00 9006.09 9500.00 8540.86 31.17 65.71 282.93 297.49 1035.58 261.02 774.56 Pass 9931.06 9007.59 9525.00 8557.79 30.95 64.16 282.79 296.22 1041.62 260.07 781.55 Pass 9935.55 9008.54 9550.00 8574.77 30.81 63.17 282.33 295.04 1048.19 260.42 787.77 Pass 9939.95 9009.45 9575.00 8591.83 30.68 62.20 281.87 293.86 1055.09 260.64 794.45 Pass 9950.00 9011.51 9600.00 8608.97 30.37 59.89 282.14 292.53 1062.27 257.07 805.20 Pass 9950.00 9011.51 9625.00 8626.19 30.37 59.92 281.14 291.52 1069.57 259.67 809.90 Pass 9950.00 9011.51 9650.00 8643.48 30.37 59.95 280.15 290.53 1077.18 262.23 814.94 Pass 9956.91 9012.89 9675.00 8660.69 30.12 58.36 280.06 289.33 1085.32 259.98 825.33 Pass 9960.92 9013.68 9700.00 8677.80 29.97 57.43 279.61 288.24 1094.08 259.48 834.60 Pass 9964.84 9014.44 9725.00 8694.70 29.83 56.53 279.17 287.18 1103.53 258.86 844.67 Pass 9975.00 9016.39 9750.00 8711.23 29.46 54.10 279.57 285.96 1113.88 253.58 860.30 Pass 9975.00 9016.39 9775.00 8727.39 29.46 54.13 278.68 285.07 1124.92 255.38 869.53 Pass 9975.00 9016.39 9800.00 8743.17 29.46 54.17 277.82 284.21 1136.78 257.13 879.64 Pass 9975.00 9016.39 9825.00 8758.82 29.46 54.20 276.99 283.38 1149.12 258.73 890.39 Pass 9983.27 9017.92 9850.00 8774.46 29.11 52.21 277.24 282.31 1161.64 253.98 907.67 Pass 9986.79 9018.57 9875.00 8790.03 28.97 51.37 276.91 281.41 1174.50 252.66 921.84 Pass 9990.25 9019.19 9900.00 8805.52 28.82 50.55 276.58 280.54 1187.71 251.27 936.44 Pass 10000.00 9020.92 9925.00 8821.05 28.41 48.13 277.11 279.51 1200.84 244.78 956.06 Pass 10000.00 9020.92 9950.00 8836.66 28.41 48.18 276.38 278.78 1213.29 245.89 967.39 Pass 10000.00 9020.92 9975.00 8852.28 28.41 48.22 275.68 278.08 1225.12 246.99 978.13 Pass ap i BP Alaska Anticollision Report • ~~~ INTG+ Q Company: , BP Amoco Date: 8/28/2008.. Timer 09:37:41 Page: 5 Field: Prudhoe Bay Reference Site: PB E Pad Co-ordinste(NE) Reference: Well: E-36, True North Reference Well: E-36 Vertieal (TVD) Reference: 57 86 6/12/1995 00: 00 64.1 Reference Wellpath: Plan 3, E-36A Dbc Oracle Site: PB E Pad Well: E-04A Rule Assigned: Major Risk Wellpath: E-04A V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TW MD T~'D Ref Offset TFO+AZI TFO-HS Casing/HSUistance Area Deviation. Warning ft ft ft ft ft ft deg deg in' ft ft ft' 10000.00 9020.92 10000.00 8867.74 28.41 48.28 275.01 277.41 1236.65 247.98 988.67 Pass 10009.43 9022.53 10025.00 8883.05 27.97 45.93 275.60 276.51 1247.78 241.10 1006.67 Pass 10013.60 9023.23 10050.00 8898.18 27.78 44.92 275.53 275.78 1258.66 238.54 1020.12 Pass 10025.00 9025.08 10075.00 8912.98 27.24 42.03 276.46 274.90 1269.45 229.79 1039.66 Pass 10025.00 9025.08 10100.00 8927.34 27.24 42.10 275.90 274.35 1279.92 230.59 1049.33 Pass 10025.00 9025.08 10125.00 8941.25 27.24 42.17 275.38 273.82 1290.23 231.34 1058.88 Pass 10025.00 9025.08 10150.00 8954.73 27.24 42.24 274.89 273.34 1300.18 232.06 1068.12 Pass 10035.70 9026.75 10175.00 8967.62 26.69 39.53 275.86 272.62 1309.46 223.42 1086.04 Pass 10040.42 9027.46 10200.00 8979.75 26.45 38.38 276.08 272.10 1318.40 219.92 1098.49 Pass 10050.00 9028.86 10225.00 8991.08 25.96 35.95 277.00 271.51 1326.99 212.10 1114.89 Pass 10050.00 9028.86 10250.00 9001.64 25.96 36.04 276.67 271.18 1334.75 212.65 1122.10 Pass 10050.00 9028.86 10275.00 9011.28 25.96 36.14 276.39 270.90 1341.98 213.17 1128.80 Pass 10060.17 9030.28 10300.00 9020.12 25.39 33.57 277.52 270.44 1348.33 204.64 1143.69 Pass 10065.30 9030.97 10325.00 9027.98 25.10 32.34 278.02 270.13 1354.04 200.58 1153.46 Pass 10075.00 9032.23 10350.00 9034.76 24.56 29.92 279.19 269.78 1359.25 192.53 1166.72 Pass 10075.00 9032.23 10375.00 9040.47 24.56 30.04 279.08 269.67 1363.93 192.99 1170.94 Pass 10075.00 9032.23 10400.00 9044.88 24.56 30.17 279.02 269.61 1368.22 193.43 1174.79 Pass 10086.14 9033.60 10425.00 9047.80 23.90 27.44 280.55 269.40 1371.85 184.15 1187.69 Pass 10091.36 9034.21 10450.00 9048.84 23.59 26.26 281.35 269.39 1375.53 180.12 1195.41 Pass 10100.00 9035.18 10475.00 9048.60 23.07 24.28 282.67 269.36 1379.12 173.37 1205.74 Pass 10100.00 9035.18 10500.00 9048.05 23.07 24.42 282.81 269.50 1382.21 173.77 1208.43 Pass 10150.00 9039.75 10725.00 9045.85 19.87 18.37 290.80 269.73 1382.27 145.47 1236.80 Pass 10150.00 9039.75 10750.00 9046.16 19.87 18.52 290.86 269.79 1378.42 146.02 1232.40 Pass 10159.12 9040.39 10775.00 9046.38 19.26 18.63 292.23 269.75 1373.72 143.31 1230.41 Pass 10164.35 9040.72 10800.00 9046.32 18.91 18.87 293.05 269.77 1369.33 142.47 1226.86 Pass 10174.00 9041.29 10825.00 9045.86 18.27 19.36 294.54 269.76 1365.37 141.40 1223.97 Pass 10174.00 9041.29 10850.00 9045.10 18.27 19.51 294.63 269.85 1360.89 141.97 1218.92 Pass 10174.00 9041.29 10875.00 9044.23 18.27 19.65 294.72 269.94 1355.82 142.56 1213.26 Pass 10184.99 9041.90 10900.00 9043.41 17.50 20.60 296.47 269.94 1350.07 142.64 1207.43 Pass 10190.01 9042.17 10925.00 9042.78 17.15 21.21 297.32 269.97 1343.01 143.43 1199.59 Pass 10200.00 9042.71 10950.00 9042.76 16.45 22.47 298.89 269.94 1335.55 145.19 1190.36 Pass 10200.00 9042.71 10975.00 9043.61 16.45 22.58 298.90 269.96 1327.52 145.57 1181.94 Pass 10200.00 9042.71 11000.00 9045.31 16.45 22.69 298.88 269.94 1318.85 145.96 1172.89 Pass 10210.00 9043.24 11025.00 9047.56 15.75 24.17 300.36 269.81 1309.45 148.52 1160.92 Pass 10214.95 9043.50 11050.00 9049.95 15.40 25.04 301.05 269.72 1299.63 150.25 1149.38 Pass 10225.00 9044.02 11075.00 9051.88 14.70 26.82 302.54 269.60 1289.25 153.84 1135.40 Pass 10225.00 9044.02 11100.00 9053.13 14.70 26.94 302.54 269.59 1278.17 154.23 1123.94 Pass 10225.00 9044.02 11125.00 9053.63 14.70 27.06 302.56 269.61 1266.74 154.64 1112.10 Pass 10234.53 9044.50 11150.00 9053.30 14.05 28.88 304.07 269.60 1255.05 158.52 1096.53 Pass 10239.48 9044.75 11175.00 9052.53 13.71 29.92 304.91 269.64 1243.78 160.83 1082.94 Pass 10250.00 9045.27 11200.00 9051.64 12.99 32.10 306.60 269.65 1232.71 165.59 1067.12 Pass 10250.00 9045.27 11225.00 9050.90 12.99 32.19 306.68 269.73 1221.92 165.91 1056.01 Pass 10250.00 9045.27 11250.00 9050.55 12.99 32.27 306.75 269.80 1211.77 166.18 1045.59 Pass 10260.02 9045.76 11275.00 9050.76 12.36 34.41 308.31 269.76 1201.97 171.01 1030.96 Pass 10265.37 9046.01 11300.00 9051.29 12.02 35.63 309.16 269.75 1192.71 173.78 1018.93 Pass 10275.00 9046.46 11325.00 9051.87 11.41 37.80 310.65 269.70 1183.88 178.67 1005.21 Pass 10275.00 9046.46 11350.00 9052.50 11.41 37.89 310.67 269.72 1175.07 178.97 996.10 Pass 10275.00 9046.46 11375.00 9053.23 11.41 37.99 310.68 269.73 1166.34 179.29 987.05 Pass 10287.24 9047.02 11400.00 9053.97 10.76 40.80 312.57 269.66 1157.51 185.91 971.60 Pass 10292.79 9047.27 11425.00 9054.46 10.46 42.15 313.44 269.64 1148.75 189.12 959.64 Pass by ~ BP Alaska Anticollision Report . mar s ~c~s INTEQ Company:. BP Amoco Date: 8/28/2008 Time: 09:37:41 Page: 6 :Field:.. Prudhoe Bay Reference. Site: PB E Pad Co-ordinate(NE):Reference: Well: E-36, True North 1eference Well: E-36 Vertical (TVD}Referenct: 57:36 6/12/1995 00: 00 64.1 Reference Wellpath: Plan 3, E-36A Db: Orate Site: PB E Pad Well: E-04A Rule Assigned: Major Risk Wellpath: E-04A V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref .Offset TFO+AZI TFO-HS Casing/IiSDistaace Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 10300.00 9047.58 11450.00 9054.51 10.08 43.87 314.59 269.64 1140.12 193.20 946.92 Pass 10300.00 9047.58 11475.00 9053.92 10.08 43.96 314.67 269.72 1131.78 193.51 938.27 Pass 10309.71 9048.00 11500.00 9052.80 9.72 46.25 316.26 269.76 1123.77 199.29 924.47 Pass 10315.46 9048.24 11525.00 9051.51 9.51 47.64 317.26 269.83 1116.17 202.84 913.33 Pass 10325.00 9048.63 11550.00 9050.05 9.16 49.90 318.85 269.89 1108.94 208.49 900.45 Pass 10325.00 9048.63 11575.00 9048.30 9.16 49.98 318.99 270.04 1102.12 208.80 893.32 Pass 10333.03 9048.95 11600.00 9047.05 9.03 51.87 320.34 270.10 1095.82 214.04 881.78 Pass 10339.04 9049.18 11625.00 9046.63 8.94 53.30 321.33 270.13 1090.19 217.97 872.22 Pass 10350.00 9049.60 11650.00 9046.81 8.78 55.84 323.06 270.11 1085.25 224.93 860.31 Pass 10350.00 9049.60 11675.00 9047.31 8.78 55.92 323.08 270.13 1080.42 225.17 855.25 Pass 10357.36 9049.87 11700.00 9048.36 8.81 57.64 324.21 270.08 1076.13 230.46 845.67 Pass 10363.53 9050.09 11725.00 9049.90 8.85 59.08 325.12 270.01 1072.10 234.89 837.21 Pass 10375.00 9050.48 11750.00 9051.64 8.90 61.67 326.85 269.90 1068.45 242.77 825.68 Pass 10375.00 9050.48 11775.00 9053.27 8.90 61.74 326.80 269.86 1065.24 242.97 822.27 Pass 10382.23 9050.72 11800.00 9054.60 9.07 63.39 327.89 269.79 1062.49 248.51 813.98 Pass 10388.51 9050.92 11825.00 9055.51 9.21 64.81 328.86 269.75 1060.11 253.34 806.77 Pass 10400.00 9051.28 11850.00 9055.63 9.47 67.32 330.67 269.73 1058.06 261.82 796.23 Pass 10400.00 9051.28 11875.00 9054.96 9.47 67.39 330.75 269.81 1056.27 262.06 794.21 Pass 10407.43 9051.49 11900.00 9053.78 9.75 69.01 332.01 269.88 1054.85 268.02 786.83 Pass 10413.74 9051.67 11925.00 9052.35 9.99 70.38 333.10 269.96 1053.37 273.08 780.29 Pass 10425.00 9051.98 11950.00 9050.90 10.42 72.71 334.97 270.03 1052.45 281.70 770.75 Pass 10425.00 9051.98 11975.00 9049.52 10.42 72.77 335.08 270.14 1052.07 281.88 770.19 Pass 10432.74 9052.18 12000.00 9048.45 10.81 74.36 336.38 270.20 1052.33 288.07 764.26 Pass 10439.08 9052.33 12025.00 9047.76 11.14 75.65 337.44 270.25 1053.12 293.14 759.98 Pass 10450.00 9052.58 12050.00 9047.02 11.69 77.79 339.22 270.28 1054.29 301.52 752.78 Pass 10450.00 9052.58 12075.00 9046.36 11.69 77.85 339.28 270.35 1055.99 301.69 754.31 Pass 10458.04 9052.76 12100.00 9046.04 12.18 79.40 340.58 270.36 1058.30 307.97 750.33 Pass 10464.32 9052.89 12125.00 9045.87 12.56 80.59 341.60 270.38 1061.17 312.86 748.31 Pass 10475.00 9053.09 12150.00 9045.59 13.21 82.53 343.32 270.39 1064.56 320.85 743.71 Pass 10475.00 9053.09 12175.00 9045.14 13.21 82.60 343.36 270.43 1068.21 321.00 747.21 Pass 10482.97 9053.23 12200.00 9044.31 13.73 84.02 344.68 270.48 1072.52 327.00 745.51 Pass 10489.11 9053.33 12225.00 9043.64 14.14 85.10 345.70 270.52 1077.27 331.60 745.67 Pass 10500.00 9053.50 12250.00 9043.29 14.87 86.92 347.45 270.53 1082.36 339.40 742.96 Pass 10500.00 9053.50 12275.00 9043.12 14.87 86.99 347.47 270.55 1087.67 339.52 748.15 Pass 10507.30 9053.60 12300.00 9042.77 15.37 88.18 348.66 270.57 1093.49 344.74 748.75 Pass 10513.27 9053.67 12325.00 9042.51 15.79 89.15 349.62 270.58 1099.68 348.97 750.71 Pass 10525.00 9053.80 12350.00 9042.63 16.60 90.92 351.48 270.57 1106.25 356.85 749.40 Pass 10525.00 9053.80 12375.00 9043.06 16.60 90.98 351.47 270.55 1113.01 356.96 756.05 Pass 10525.00 9053.80 12400.00 9043.72 16.60 91.05 351.44 270.53 1120.15 357.20 762.95 Pass 10536.70 9053.91 12425.00 9044.74 17.42 92.73 353.25 270.47 1127.37 364.80 762.57 Pass 10542.43 9053.95 12450.00 9045.83 17.83 93.55 354.11 270.41 1134.99 368.54 766.45 Pass 10550.00 9054.00 12475.00 9046.88 18.36 94.57 355.26 270.35 1142.98 373.29 769.68 Pass 10815.17 9054.10 12500.00 9047.78 13.36 83.20 342.88 270.31 1149.57 322.98 826.59 Pass 10825.00 9054.10 12525.00 9048.52 13.72 84.52 344.02 270.28 1152.90 328.13 824.78 Pass 10825.00 9054.10 12550.00 9049.11 13.72 84.61 343.99 270.25 1156.76 328.32 828.44 Pass 10836.85 9054.10 12575.00 9049.64 14.19 86.14 345.38 270.22 1160.91 334.45 826.45 Pass 10844.00 9054.10 12600.00 9049.82 14.48 87.08 346.23 270.21 1165.49 338.21 827.28 Pass 10850.00 9054.10 12625.00 9050.11 14.72 87.86 346.93 270.20 1170.50 341.23 829.27 Pass 10858.16 9054.10 12650.00 9050.64 15.07 88.87 347.89 270.17 1175.93 345.40 830.52 Pass 10865.17 9054.10 12675.00 9051.07 15.38 89.72 348.71 270.15 1181.74 349.59 832.15 Pass 10875.00 9054.10 12700.00 9051.48 15.80 90.83 349.87 270.13 1187.93 355.98 831.95 Pass ap ~ BP Alaska Anticollision Report • ~;t~ s INTEQ Company:. BP Amoco Date: 8/28/2008 Time:. 09:37:41 Page: 7 Field: Prudhoe Bay Reference Site: PB E Pad Co-ordinate(NE) Reference WeIL• E-36, True North Reference Well: E-36 Vertical (TVD) Reference: 57:36 6/12/1995 00: 00';64.1 Reference Wellpat6c Plan 3, E-36A Db: Oracle Site: PB E Pad Well: E-04A Rule Assigned: Major Risk Wellpath: E-04A V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable. MD TVD MD TVD Ref Offset TFO+AZI TFO-IiS Casing/HSflistance Area Deviation .Warning ft ft ft ft ft ft deg deg in ft ft ft 10875.00 9054.10 12721.15 9051.83 15.80 90.87 349.85 270.11 1193.43 357.67 835.76 Pass Site: PB E Pad Well: E-04 Rule Assigned: Major Risk Wellpath: E-04 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/FISflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9643.89 8940.97 8500.00 7853.27 29.46 107.24 278.05 338.63 1199.15 193.84 1005.31 Pass 9650.00 8942.36 8525.00 7874.56 29.71 107.71 278.56 338.13 1182.25 196.30 985.95 Pass 9658.19 8944.23 8550.00 7895.88 30.00 108.06 279.30 337.53 1165.47 198.81 966.67 Pass 9665.37 8945.88 8575.00 7917.21 30.25 108.41 279.90 336.95 1148.83 201.41 947.42 Pass 9675.00 8948.11 8600.00 7938.56 30.59 108.58 280.78 336.26 1132.34 204.07 928.27 Pass 9679.80 8949.22 8625.00 7959.89 30.73 108.98 281.03 335.71 1116.06 206.91 909.15 Pass 9687.03 8950.91 8650.00 7981.26 30.94 109.20 281.55 335.05 1100.00 209.82 890.18 Pass 9694.25 8952.60 8675.00 8002.66 31.15 109.37 282.04 334.35 1084.15 212.90 871.25 Pass 9700.00 8953.95 8700.00 8024.07 31.32 109.61 282.31 333.67 1068.50 216.20 852.31 Pass 9708.70 8956.01 8725.00 8045.45 31.53 109.59 282.93 332.87 1053.03 219.31 833.73 Pass 9715.95 8957.72 8750.00 8066.80 31.70 109.63 283.34 332.08 1037.86 222.67 815.19 Pass 9725.00 8959.87 8775.00 8088.14 31.91 109.45 283.94 331.19 1023.02 226.01 797.01 Pass 9730.41 8961.16 8800.00 8109.48 32.01 109.59 284.05 330.41 1008.45 229.82 778.63 Pass 9737.61 8962.88 8825.00 8130.81 32.13 109.51 284.35 329.52 994.14 233.56 760.57 Pass 9744.80 8964.59 8850.00 8152.12 32.26 109.39 284.62 328.61 980.13 237.44 742.69 Pass 9750.00 8965.83 8875.00 8173.41 32.35 109.47 284.61 327.74 966.45 241.75 724.70 Pass 9759.12 8968.01 8900.00 8194.68 32.46 109.03 285.05 326.68 953.09 245.48 707.61 Pass 9766.24 8969.72 8925.00 8215.91 32.54 108.80 285.21 325.67 940.09 249.64 690.45 Pass 9775.00 8971.81 8950.00 8237.10 32.64 108.28 285.54 324.55 927.49 253.55 673.94 Pass 9780.42 8973.10 8975.00 8258.25 32.67 108.19 285.42 323.54 915.30 258.21 657.09 Pass 9787.43 8974.77 9000.00 8279.40 32.71 107.83 285.45 322.42 903.53 262.59 640.94 Pass 9794.37 8976.43 9025.00 8300.55 32.74 107.44 285.44 321.26 892.18 267.10 625.08 Pass 9800.00 8977.77 9050.00 8321.70 32.77 107.21 285.22 320.11 881.23 272.05 609.18 Pass 9808.07 8979.68 9075.00 8342.85 32.77 106.54 285.27 318.84 870.68 276.26 594.42 Pass 9814.82 8981.28 9100.00 8364.00 32.76 106.04 285.12 317.58 860.55 280.88 579.67 Pass 9825.00 8983.68 9125.00 8385.14 32.75 104.88 285.37 316.15 850.89 284.34 566.55 Pass 9825.00 8983.68 9150.00 8406.22 32.75 105.59 284.31 315.09 841.71 291.49 550.22 Pass 9834.80 8985.98 9175.00 8427.23 32.69 104.41 284.45 313.62 833.02 294.88 538.14 Pass 9841.40 8987.52 9200.00 8448.17 32.64 103.80 284.17 312.25 824.88 299.42 525.46 Pass 9850.00 8989.52 9225.00 8469.04 32.58 102.75 284.10 310.78 817.27 303.03 514.25 Pass 9854.49 8990.55 9250.00 8489.87 32.52 102.53 283.50 309.43 810.16 308.35 501.81 Pass 9860.97 8992.05 9275.00 8510.65 32.44 101.86 283.12 307.99 803.58 312.89 490.69 Pass 9867.41 8993.52 9300.00 8531.38 32.35 101.15 282.71 306.53 797.53 317.34 480.19 Pass 9875.00 8995.25 9325.00 8552.07 32.25 100.15 282.43 305.00 791.98 321.03 470.96 Pass 9880.14 8996.42 9350.00 8572.76 32.15 99.69 281.82 303.55 786.82 325.92 460.90 Pass 9886.45 8997.84 9375.00 8593.46 .32.03 98.93 281.35 302.05 782.06 329.85 452.21 Pass 9892.71 8999.24 9400.00 8614.15 31.91 98.13 280.85 300.53 777.69 333.57 444.12 Pass 9900.00 9000.86 9425.00 8634.85 31.77 97.03 280.47 298.96 773.77 336.34 437.43 Pass 9904.99 9001.96 9450.00 8655.65 31.65 96.47 279.77 297.44 770.39 340.44 429.95 Pass 9910.95 9003.26 9475.00 8676.53 31.50 95.63 279.17 295.86 767.59 343.61 423.98 Pass 9916.78 9004.53 9500.00 8697.51 31.35 94.78 278.52 294.26 765.37 346.63 418.74 Pass 9924.00 9006.09 9525.00 8718.57 31.17 93.50 278.03 292.59 763.74 348.23 415.51 Pass 9924.00 9006.09 9550.00 8739.71 31.17 94.15 276.60 291.16 762.73 355.29 407.44 Pass 9933.77 9008.16 9575.00 8760.93 30.87 92.07 276.38 289.37 762.24 354.39 407.86 Pass by ~ BP Alaska Anticollision Report mar B s INTEQ Company: BP Amoco Date: 8/28/2008 Time: 09:37:41 Page: S Field: Prudhoe Bay leference Site: Pf3 E Pad Co-ordnate(NE) Reference: WeIL• E-36, True North Reference Well: E-36 VerticaL(TVD) Reference: 57 i 36 6/12/1995 00: 0064.1 Reference.Wellpath: Plan 3, E-36A Db: Orade Site: PB E Pad Well: E-04 Rule Assigned: Major Risk Wellpath: E-04 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aais Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistanee Area. Deviation Warning ft ft ft ft ft ft deg deg in ft ft tt 9939.24 9009.30 9600.00 8782.23 30.70 91.15 275.61 287.73 762.39 356.52 405.88 Pass 9944.57 9010.40 9625.00 8803.60 30.54 90.23 274.82 286.07 763.15 358.40 404.76 Pass 9950.00 9011.51 9650.00 8824.99 30.37 89.25 274.03 284.41 764.57 359.84 404.73 Pass 9954.95 9012.50 9675.00 8846.39 30.19 88.39 273.18 282.77 766.65 361.33 405.32 Pass 9960.00 9013.50 9700.00 8867.80 30.00 87.47 272:35 281.14 769.38 362.31 407.08 Pass 9964.94 9014.46 9725.00 8889.24 29.82 86.55 271.52 279.51 772.79 362.98 409.80 Pass 9969.76 9015.39 9750.00 8910.70 29.65 85.64 270.67 277.89 776.91 363.40 413.50 Pass 9975.00 9016.39 9775.00 8932.19 29.46 84.57 269.89 276.27 781.74 363.04 418.69 Pass 9975.00 9016.39 9800.00 8953.71 29.46 85.15 268.44 274.83 787.30 367.72 419.59 Pass 9983.54 9017.97 9825.00 8975.26 29.10 82.97 268.12 273.14 793.47 363.13 430.34 Pass 9987.93 9018.77 9850.00 8996.85 28.92 82.10 267.27 271.60 800.23 362.49 437.74 Pass 9992.23 9019.55 9875.00 9018.48 28.74 81.23 266.44 270.08 807.53 361.62 445.91 Pass 10000.00 9020.92 9900.00 9040.15 28.41 79.18 266.08 268.48 815.40 356.58 458.82 Pass 10000.00 9020.92 9925.00 9061.85 28.41 79.72 264.72 267.13 823.76 359.95 463.81 Pass 10000.00 9020.92 9950.00 9083.54 28.41 80.26 263.40 265.81 832.80 363.08 469.72 Pass 10008.58 9022.39 9975.00 9105.22 28.01 77.87 263.23 264.27 842.37 356.07 486.30 Pass 10012.48 9023.05 10000.00 9126.88 27.83 77.06 262.48 262.90 852.56 354.19 498.37 Pass 10016.29 9023.68 10025.00 9148.52 27.65 76.26 261.74 261.57 863.33 352.18 511.15 Pass 10025.00 9025.08 10050.00 9170.14 27.24 73.71 261.70 260.15 874.72 344.05 530.68 Pass 10025.00 9025.08 10075.00 9191.73 27.24 74.23 260.53 258.98 886.59 346.20 540.39 Pass 10025.00 9025.08 10100.00 9213.29 27.24 74.75 259.39 257.84 899.05 348.25 550.79 Pass 10025.00 9025.08 10125.00 9234.84 27.24 75.26 258.29 256.74 912.09 350.12 561.97 Pass 10034.20 9026.52 10150.00 9256.43 26.77 71.96 258.44 255.44 925.53 339.03 586.50 Pass 10037.52 9027.03 10175.00 9278.03 26.60 70.67 257.84 254.32 939.46 334.76 604.70 Pass 10040.77 9027.51 10200.00 9299.63 26.43 69.38 257.27 253.23 953.79 330.23 623.56 Pass 10041.11 9027.56 10202.60 9301.87 26.41 69.24 257.21 253.12 955.31 329.75 625.56 Pass Site: PB E Pad Well: E-36 Rule Assigned: Major Risk Wellpath: E-36 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable . MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistanee Area Deviation Warning R ft ft ft ft ft deg deg in ft ft ft 9225.00 8782.23 9225.00 8782.23 27.50 27.34 316.29 0.00 0.00 137.98 -137.98 FAIL 9250.00 8799.91 9250.00 8799.92 27.66 27.61 315.79 0.00 0.03 138.51 -138.49 FAIL 9274.98 8816.69 9275.00 8816.97 27.70 27.78 77.80 124.95 0.64 180.20 -179.56 FAIL 9299.82 8832.27 9300.00 8833.48 27.71 27.91 79.67 129.47 2.39 175.70 -173.31 FAIL 9324.42 8846.53 9325.00 8849.52 27.69 28.00 81.69 133.88 5.18 169.98 -164.81 FAIL 9348.58 8859.34 9350.00 8865.29 27.63 28.06 82.38 136.73 9.47 165.59 -156.13 FAIL 9372.08 8870.61 9375.00 8880.91 27.56 28.09 82.31 138.64 15.40 161.93 -146.53 FAIL 9394.79 8880.34 9400.00 8896.41 27.47 28.09 82.33 140.45 22.78 157.70 -134.92 FAIL 9416.67 8888.59 9425.00 8911.89 27.36 28.07 82.89 142.65 31.32 152.07 -120.75 FAIL 9437.55 8895.41 9450.00 8927.38 27.26 28.03 83.21 144.48 41.21 146.56 -105.35 FAIL 9457.35 8900.90 9475.00 8942.58 27.15 28.00 82.62 145.28 52.41 142.74 -90.32 FAIL 9476.23 8905.26 9500.00 8957.21 27.01 27.96 81.08 145.24 64.72 140.72 -76.00 FAIL 9495.44 8909.33 9525.00 8971.15 26.53 27.56 77.38 144.68 77.53 141.59 -64.06 FAIL 9514.00 8913.26 9550.00 8984.34 26.00 27.11 73.12 143.46 90.51 143.34 -52.82 FAIL 9531.73 8916.98 9575.00 8996.98 25.44 26.62 68.67 141.91 103.96 145.27 -41.31 FAIL 9548.59 8920.50 9600.00 9009.00 24.87 26.10 64.17 140.16 117.83 147.06 -29.23 FAIL 9575.10 8926.00 9625.00 9020.31 26.29 27.65 65.45 137.25 131.29 156.84 -25.55 FAIL 9605.93 8932.55 9650.00 9030.88 27.82 29.32 67.93 134.71 143.19 167.13 -23.95 FAIL 9639.53 8939.98 9675.00 9040.51 29.28 30.92 71.02 132.31 153.29 176.77 -23.48 FAIL by ~ BP Alaska Anticollision Report • BAI~R r ~~s INTG+ Q Company: BP Amoco Date: 8/28/2008. Time: 09:37:41 Page: 9 Fields Prudhoe Bay Reference Site: PB E Pad Co-ordinate(NE) Reference: Well`. E-36, True North Reference Well: E-36 Vertical (TVD) Reference:. 57 ; 36 6/12/1995 00:00 64.1 Reference Wellpath: Plan 3, E-36A Db: OraGe Site: PB E Pad Well: E-36 Rule Assigned: Major Risk Wellpath: E-36 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Bef Offset TFO+AZI TF0.HS Casing/HSflistanee Area peviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9675.87 8948.31 9700.00 9049.44 30.61 32.35 74.84 130.17 161.20 185.11 -23.91 FAIL 9714.37 8957.35 9725.00 9057.77 31.66 33.52 79.31 128.30 166.77 191.50 -24.74 FAIL 9754.25 8966.85 9750.00 9065.41 32.40 34.35 84.20 126.64 170.10 195.84 -25.73 FAIL 9794.71 8976.51 9775.00 9072.62 32.75 34.77 89.62 125.39 170.87 197.38 -26.52 FAIL 9834.65 8985.94 9800.00 9079.72 32.69 34.77 95.54 124.73 169.29 195.85 -26.56 FAIL 9873.11 8994.82 9825.00 9086.81 32.28 34.37 101.89 124.77 165.64 191.34 -25.70 FAIL 9909.35 9002.91 9850.00 9093.91 31.54 33.66 108.64 125.59 160.23 184.04 -23.81 FAIL BP CTD BOP Stackup 2 318" Coil b P wait: ~-36n Rig: Nordic 2 Rlg Floor toTop of Bag: 9.23' 7 t? 16" Drill Annular. 5000 si (923') 7 1? 16' SQ00 psi. RX-46 Blind Shears TOT (12.65) 2 3?8" Combi's TOT (13.56') i s ~ 7 1?16" 5000 si. RX-46 KiIJ Linn Mud Cross (14,89') ~-_ 2 t?t 6" 5000 si. RX-24 2 3?8'x 3 1?2' Variable Ram 16.10 - 2 3: B" Cornbi TOT (16.66q Tree Size: 4 1:16" 7 t?16"x3 t?S" Fla edAda ter Swab Valve (20.04') Flcw Line SSV (22.88') ~--- Master Valve (24.86') Lock Dam Screws 26.68' Ground Level (31.00') Alaska Department of Natural Resources Land Administration System Page 1 ofd i ~ r a_i~_ ~ -.ts he ~ra~r's S~ar~h State Cabins ~tur~ ~kl Alaska DNR Case 5umr~nary LAS Menu I Case Abstract I Case Detail I Land Abstract Fi/e: _~UL 28299 Search fc~r Stat,~s Plat ~~>~;~~tes ,1s of l ll'fJ I '1i08 Cnstonrer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case T1he: ~~~,~, OIL & GAS LEASE COMP DNR Uni(: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Corse Slalus: 35 ISSUED Slaltrs Date: 09/14/1965 Total Acres: 2459.000 Date Initiutecl: 0/28/1965 Office of Prinrcrrv Reshortsibility: DOG DIV OIL AND GAS Lcrst Transaction Drrte: 12/04/2006 Case Snbt~-he: ~,,~~-p NORTH SLOPE Last 1'runsaction: AA-NRB ASSIGNMENT APPROVED Meri~lirru: U Totirrrehip: 012 i~'' Run~c>: 014E ~~~~~-~ti~irr ~ 29 ~'c~~ tiotr Acres: 640 Search r,;,,,s alc~~•i~/hrn. I Toti~~r~tsltih: (11 '~ Run,~,~: 014E J'~~c riurr.~ 30 ~t'~~~~Iiojr Ac°r~~~~: 588 ~llericJi~rn.~ t' 7oti~~nsfri~>: (~ I `'\ R~nzge: 014E ~~~~~c~n,~n: ~ I ~~'~~~~rion_4crc~.~ ~~)1 hleridiarr: is Townslri~~~ (l i ~~' "Range: 014E Section: _'>~' ~~ectron.4cr~~~- (>~(~ Legal Description l)~-2~5'-196 ***S.II.F. ,'~~OTIC'EI_F.CTAL DESC'RIPT1O~1~ `** C1.1-120 012N-0[-1L'-UN129,30.31,3' 2-19.00 0-1-01-19 %' * * * UNITIZED LLG.1 L DESCRIPT1O~1''° TI 2;'V', R I -LE, U~11 .SECS. 2 9, 31, , 2 C'ONT:~INING I b'?1 AC'RES ~tIORE OR LESS. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28299&... 10/1 /2008 Alaska Department of Natural Resources Land Administration System Page 1 of~''~ ~.~:~ a~ -1 '~. .. , ~ is R~c~r~`~r`~ ~~~~~rc ~ Stag Cabins ~~U!`~i ~ 5~lJt'€~S r LAS N9enu I Case Abstract I Case Detail I Land Abstract ., f~rlcr: 4DL 28303 ~ -'~ S<~:~rrh for StaY~us PEat ~+~~~~ates ~1 ~,I~ 1 OiOI;'~'OOS Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX. 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Tvhe: ~ OIL & GAS LEASE COMP DNR U~iit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Staters: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2469.000 Date hritiatec~: 05/28/1965 Office of Primary Responsibility: DOG DIV O1L AND GAS Last Transaction Date: 12/04/2006 Case Subt}~pe : f~;~~ NORTH SLOPF Last Transaction: AA-NRB ASSIGNMENT APPROVED Mee°idian: U 7~nr~1s/~i~~: UI1N Range: OI~IL Srctr;,~i: (l~ S~r~~rion Acres: t,~U Search Plats ~~~'i'1~~/clJl.' ~ ~~ril'!l~~11~7: O~ ~ ~ lirlN,~rC'." ~) ~ ~1, ~~C(.'llt~ll.~ Ob ,~~'~~ll(171 .`~CrE'~'.~ ~~)-; V~~ri~liu~r.~ t ~ 7i,irn.~l~iJ~.~ 0l IN Run~rc°.~ Il I ~I: S~~~c1i~,u.~ Il % ~~~~~~[r~,n ~crc~~: ~~)(> 11~>f~icliu~~ ~ [_ l nirn.~hi~, ~ O I IN Run~~~ .~ 01-~1~ ,C~~ctiv~l.~ 08 S'~ c~trnir :~tcrE~~.~ (, iU Le~~~il Descriptioai 0~-28-196 * * *SALE NOTICE LEG:1 L DESCRIPTION* ~' CI=1-1?~ IIN ICE UMW, 6. 7, ~ 269.00 U- 3- ~ S~ U 1" Last updated on 10/01/2008. http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=283 04&... 10/1 /2008 TRANSMITTAL LETTER CHECKLIST WELL NAME _ ~~'C/ ~ - 3,~A _,~ Devetopment~ Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: .~.E'!//J',~/p~'tJAJi POOL: ~.e~/~DyO~' f~Y ~et Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) ~~ FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. . APi No. SO- AP) number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(fj, all records, data and logs acquired for the pilot hale must be clearly differentiated in both well name ( PH) and API cumber (SO- - _~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inicxt is contingept upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH Ail dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h et zones. Non-Conventional Well please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for (name of weD,~ until after (Comnanv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. ~Gomnanv Name) must contact the Commission to obtain advance approval of such water welt testing ro Rev: 1/I 12008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE Olt. -640150 Wetl Name: PRUDHOE BAY UNIT E-36A Program DEV Well bore seg PTD#:2081490 Comparry ap Fxai nRATiON (ALASKA) INC Initial Classlfype DEV / PEND GeoArea 890 Unit 11650 On10ff Shore ~n Annular Disposal ^ Administration 1 Permitfee attached- - - - - - - - - - - - - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Lease number appropriate----- - -- - -- --- -- - Yes--- - -- -- - -- ---- --- - --- - ---- - -- ---- -- 3 Uniquewell_nameandnumber ----- --- - -- ----- - - -Yes---- ---- - - - - --- ---- ---- - -- -- --- ---- -- - 4 Well locate¢ina_deferaedp941-- -- - -- - -- --- - Yom- - - - -- -- -- ---- ---- -- - -- --- -- - 5 Well locate¢ProPerdistanGeftomdrilling~nit_boundary--------------------- --Yes----- ----------------------------------------------- ------- --- 8 W@Il locaied proper distance from other wells - - - - - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Sutficientaoreageavailableindriilingunit- - - -- -------- Y~---- -- ----- --- - ---- -- -- -- --- -- - -- ------- 8 If deviated,is_Weilboreplat_included--- --- -- -- - -- --- Y~-- ---- -- -- -- -- ------ -- ---- - - - - - -- - - --- 9 Opt=ratoronly affected party --- --- - -- ---- --- -- - - Yes--- --- - -- ---- ------------ ---- - -- -- -- ---- 10 Opetatoihas_appropriatebondinforoe-_____._.--_-_.----.-------- _-Yes---- -.f}IaoketBon¢#61$4193..-------------------------------------------------- 11 Pemlitoanbeissuedwitbautconservatignor¢er--------------.---------- --Yes----- ----------------------------------------------------_ ----- ---- --- Appr Date 12 Permitcan be issued vvlthoutadministrative-approval _ _ _ _ _ __ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ Yes _ _ _ . - - _ - - - 13 Canpertnit baaRp~ve¢baforet5•daywait.---- -- -- ------ --- - -- Yes -. --- -. - - -- ------ ---- ---- - -- ~ -- - --- - -- ACS 101112008 14 - -WBIIIOCatedwithinar8aaadslrataauthorizedbY-InjeCtionprdet#(putip#in_comments)-(F 4r--KA----- ------------------------------------------------------------------- 15 All wells-within 114-miieatee ofteviewideDtifired(Forse-vicewell9oly)._____...-__ _.NA------ --------------------------------------------------------------------- 18 Pte-produced injector.~urationofpreproducti9nlessihan3montias-(ForservicewellonJy) __-NA_____ ------------------------------------------------------------------- 17 Konconven,gasconformstoA$31,05A30Q,1.A)~(L2.A-i))- - --- --- - ---NA- - --- --- --- -- - ------ --- - --- -- -- --- --- - - ----- Engineering 16 Conductotstdng-provided________________________.---.--.-_-__ -.NA----,- --C4nductorsetinE-36(195.073)t______.___-__-______--__.----------------_----- 19 Sulfate.casingprQteot&aliknownUSDWS----------------------------- -- NA----- --No aquifers,AIQ46,_Gonclusion_5.---------_------------------------------------ 20 C1u1T-votadequate_tecitculateoncooductor&surf.csg---------------------- -- NA---.- --Surtacecasingsetin~-3$•----------------------------.---------------------- 21 CMT-voladequate-t9lie-in long stringto_strrfcsg_________________________ ___NA____ __Pro¢ucticncasingsetin-E-36.----_____.--__________--.---__-------_--_.------- 22 CMT-vdllcoyerali known_produotdehor~ons -- - - -- -- ---- Yes--- --- - -- -- -- ----- -- -- --- ------ - --- - --- - 23 Casing¢esynsadequatefotC,T,BB_petroafrost------------------__-_. --Yes-.--- ----------------------------------------------- --- -- - --- --- 24 Adequate tankage-or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ Yes _ - _ _ _ - _ Rig equipped with steel phs, ldo-reserve pit planned.- All waste_to approved disposal well(s), - - _ _ - _ - - _ _ _ _ _ 25 ifare-drill,has.a10.403foraban¢onmentbeenapRroved-____--._---_-____ _YeS____. _308-33$_____-..-_-____--______-_:;-------------------------------- 26 Adequate wellbore separatiortptoposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - - _ _ _ - Proximity anatysis perfo[med, Nearest segment is P$~A portion of E-36 and paths-dive[ge, - - _ - - - _ - _ _ _ _ 27 Ifdiveder_requited, doesitmeetregulatipns_.------------------------ ---NA---- --BOPstackwi1181readY.beirlpiace,-------------------------------------------- Appr Date 28 DnUing fluid-program schematic-& equip list_adequate- - - - - - - - - - - - - - _ _ _ - _ -Yes _ _ _ _ _ - _ Maximum expected fomlation pressure 7,5 EMW.- M_W_ planned 8.6 ppg. - _ - - - - _ - _ _ _ _ _ - - _ _ _ _ . . _ _ TEM 101212008 29 BQPEs,-dotheymeetrQ9ulation---- ---- - - - - --- Yes - --- -- ---- - -- --- - ---- - -- --- 30 ROPE-press rating appropriate; test to_(put prig in cemments)- - - _ _ _ - - _ _ - _ _ - _ Yes _ _ _ MASP calculated at 2543psi, 3500-psi_BOP testplanned_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ 31 Choke-manNol¢ complies w1APL RP-5$ (May $4)- - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - G 32 Workwilioccurwithoutoperationsbutdown_---_-_.------------------ --Yes---- ---------------------------------------------------- - - ---- 33 is presence of H?S gas probable_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA- - _ - - _ _ _ Minc[H2S_reported at E pad.- Mud shot~id preclude H25 on-rg, Righas sensors and alarms,- - - _ - _ _ _ - _ - . _ 34 Meohanlcalc9nditionafvvellswithinAORyQrified(Forservicewellonly)-_----_____ __ NA.____ ____-___--------------------------------- ---------------------- Geology 35 Petmitcanbeissue¢wlohyd(ogensu8i¢Qmaas~tes-_____________________ __No______ __MaxlevelH2S4nEpad-was29ppmonweil E-25._____--____----______-__--___-__-____- 36 Aata_presented on potential9ve~pressurezenes - - - - - - - - - ~'- - - - - ~ - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - Appr Date 37 Seismic analysis-ofsbaitow gas zones___.___________________________ __ NA___-__ -_--------------- ---- - - ---- - -------------------------------- - ---- ACS 101112D06 38 Seabed-condition survey_(if off-shore) - _ _ _ _ _ - -- ---- ---- NA---- ---- --- --- --~ ---- --- - -- -- - ---- --- 39 Contactnamelphoneforweeky_progressreports-(exploratorycnly]_______________ __ Yes_____ __CharlesReyn91¢s-_564.54$0,-___________-__-_______-__------__--__-______-- Geologic Commissioner: Engineering Public Date: Commissioner: Date Com 'over Date /o •~ -08 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efforl has been made to chronologically organize this category of information. • **** REEL HEADER **** MWD 09/03/16 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/01/14 2367724 01 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9040.0000: Starting Depth STOP.FT 11861.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: E-36A FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 20' 20.323"N 148 deg 40' 06.013"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 14 Jan 2009 API API NUMBER: 500292256301 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 06 TOWN.N T11N RANG. R14E PDAT. MSL EPD .F 0 LMF DF FAPD.F 64.1 DMF DF EKB .F 0 EDF .F 64.1 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless (3) All True Vertical Depths (TVDSS) (4) All Formation Evaluation data is (5) Baker Hughes INTEQ utilized Coil Advantage otherwise noted. are Subsea corrected. realtime data. Prak downhole tools and the surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and any depth shifting has been waived by Doug Stoner with BP Exploration (Alaska), Inc. The MWD is the Primary Depth Control (PDC) log for well E-36A. (8) The sidetrack was drilled from E-36 through a milled window in a 7 5/8 inch liner. Top of window 9229 ft.MD (8721.0 ft.TVDSS) Bottom of window 9236 ft.MD (8725.9 ft.TVDSS) (9) Tied to E-36 at 9224 feet MD (8717.31 feet TVDSS). (10) The interval from 11821 feet to 11861 feet MD (8995.9 feet to 8997.8 feet TVDSS) was not logged due to sensor to bit offset. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 75 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD.*** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and any depth shifting has been waived by Doug Stoner with BP Exploration (Alaska), Inc. The MWD is the Primary Depth Control (PDC) log for well E-36A. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-t ype is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 157 Tape File Start Depth = 9040.000000 Tape File End Depth = 11861.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 170 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specifi cation Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curv es: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 314 Tape File Start Depth = 9040.000000 Tape File End Depth = 11861.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 327 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/01/14 2367724 01 **** REEL TRAILER **** MWD 09/03/16 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes • Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9040.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9040.5000 86.3000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 46.3000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 30.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 72.8000 76.9000 188.7630 138.0580 48.2850 37.8570 9400.0000 21.5000 24.4000 81.0410 571.4550 97.9300 82.9670 9500.0000 24.8000 54.3000 97.9980 2000.0000 94.9360 75.2420 9600.0000 21.1000 55.0000 80.9070 226.0520 76.3790 61.1510 9700.0000 20.0000 63.5000 43.4440 87.5870 48.6010 41.0250 9800.0000 54.0000 28.3000 17.7750 27.8460 34.2840 50.0530 9900.0000 19.6000 72.7000 30.5770 73.5640 68.4170 65.2860 10000.0000 22.0000 34.4000 24.0680 64.5720 54.5730 52.3540 10100.0000 95.6000 83.3000 18.5040 21.7930 17.6950 15.8650 10200.0000 20.5000 76.8000 22.4270 33.7760 28.4590 27.8060 10300.0000 22.7000 33.0000 17.4890 21.9390 18.8640 17.2310 10400.0000 25.6000 41.7000 9.4730 9.7800 9.8380 10.3950 10500.0000 26.6000 48.5000 8.5530 8.0290 8.3010 8.9290 10600.0000 24.1000 59.0000 8.3450 9.5500 9.3930 9.9620 10700.0000 25.9000 57.5000 9.3120 8.8520 8.2610 7.3750 10800.0000 18.2000 117.9000 10.0640 10.6490 10.0400 9.6110 10900.0000 20.2000 133.3000 10.6500 11.8360 • 11.8860 12.2100 11000.0000 19.6000 91.8000 10.0400 9.6300 11100.0000 18.5000 88.9000 9.7300 8.9280 11200.0000 25.2000 98.3000 12.7950 11.3730 11300.0000 19.6000 136.2000 17.1170 16.8810 11400.0000 21..4000 114.0000 14.2240 14.7480 11500.0000 23.8000 99.2000 10.3230 9.7160 11600.0000 20.3000 67.7000 10.1230 9.0010 11700.0000 20.1000 41.2000 22.3140 22.4400 11800.0000 20.3000 44.9000 18.2380 16.6910 11861.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9040.000000 Tape File End Depth = 11861.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 10.0080 10.0800 14.2330 16.1000 12.9400 11.3620 14.2520 22.7690 24.3810 -999.2500 10.7400 10.5320 14.2460 17.4510 14.2750 11.2700 11.3190 24.0540 20.2990 -999.2500 • • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9040.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9040.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 46.3000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 30.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 72.8000 76.9000 188.7630 138.0580 48.2850 37.8570 9400.0000 21.5000 24.4000 81.0410 571.4550 97.9300 82.9670 9500.0000 24.8000 54.3000 97.9980 4719.0459 94.9360 75.2420 9600.0000 21.1000 55.0000 80.9070 226.0520 76.3790 61.1510 9700.0000 20.0000 63.5000 43.4440 87.5870 48.6010 41.0250 9800.0000 54.0000 28.3000 17.7750 27.8460 34.2840 50.0530 9900.0000 19.6000 72.7000 30.5770 73.5640 68.4170 65.2860 10000.0000 22.0000 34.4000 24.0680 64.5720 54.5730 52.3540 10100.0000 95.6000 83.3000 18.5040 21.7930 17.6950 15.8650 10200.0000 20.5000 76.8000 22.4270 33.7760 28.4590 27.8060 10300.0000 22.7000 33.0000 17.4890 21.9390 18.8640 17.2310 10400.0000 25.6000 41.7000 9.4730 9.7800 9.8380 10.3950 10500.0000 26.6000 48.5000 8.5530 8.0290 8.3010 8.9290 10600.0000 24.1000 59.0000 8.3450 9.5500 9.3930 9.9620 10700.0000 25.9000 57.5000 9.3120 8.8520 8.2610 7.3750 10800.0000 18.2000 117.9000 10.0640 10.6490 10.0400 9.6110 10900.0000 20.2000 133.3000 10.6500 11.8360 11.8860 12.2100 11000.0000 19.6000 91.8000 10.0400 9.6300 11100.0000 18.5000 88.9000 9.7300 8.9280 11200.0000 25.2000 98.3000 12.7950 11.3730 11300.0000 19.6000 136.2000 17.1170 16.8810 11400.0000 21.4000 114.0000 14.2240 14.7480 11500.0000 23.8000 99.2000 10.3230 9.7160 11600.0000 20.3000 67.7000 10.1230 9.0010 11700.0000 20.1000 41.2000 22.3140 22.4400 11800.0000 20.3000 44.9000 18.2380 16.6910 11861.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9040.000000 Tape File End Depth = 11861.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 10.0080 10.0800 14.2330 16.1000 12.9400 11.3620 14.2520 22.7690 24.3810 -999.2500 10.7400 10.5320 14.2460 17.4510 14.2750 11.2700 11.3190 24.0540 20.2990 -999.2500 • Tape Subfile 4 is type: LIS