Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-173
RECEIVED STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMM.N OCT 0 8 2015 ' WEL OMPLETION OR RECOMPLETION REPAND LOG ' la. Well Status: Oil 0 Gas ❑ SPLUG 0 Other 0 Abandoned IZJ• Suspended 0 lb.Well Cla4 ic)6CO 20AAC 25.105 20AAC 25.110 Development p Exploratory 0 GINJ 0 WINJ 0 WAG ❑ WDSPL 0 No.of Completions: Zero • Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc •9/7/2015 ' 208-173 3. Address: 7. Date Spudded: 15 API Number P.O.Box 196612 Anchorage,AK 99519-6612 2/3/2009 50-029-20629-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 2/14/2009 PBU F-19A • Surface: 2845'FNL,2192'FEL,Sec.02,T11 N,R13E,UM - 17. Field/Pool(s): 9. KB(ft above MSL): 64.93' • Top of Productive Interval: 2787'FSL,3203'FEL,Sec.35,T12N,R13E,UM GL(ft above MSL): 36.22' . PRUDHOE BAY,PRUDHOE OIL• Total Depth: 2670'FSL,55'FEL,Sec.34,T12N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 4194'/3752' ADL 028280,028277&028278 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 652649- y- 5973969 • Zone - ASP 4 . 13980'/8688' ' TPI: x- 651518 y- 5979579 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20. Thickness of Permafrost MD/fVD: Total Depth:x- 649389 y- 5979419 Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey: Yes 0 (attached) No RI 13. Water Depth.if Offshore: 21. Re-drill/Lateral Top V ndow MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/'4 (ft MSL) • 8214'/6269' . 22 Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary DIR/GR/RES/PWD,USIT,DIR/GR/RES/NEU/DEN 23. CASING,LINER AND CEMENTING RECORD CASING W7.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20"x 30" 31' 111' 31' 111' 36" 8 cu yds Concrete 13-3/8" 72# L-t0 30' 2719' 30' 2686' 17-1/2" 4836 cu ft Permafrost II 9-5/8" 47# 5-95 146' 8214' 146' 6269' 12-1/4" 1817 cu ft Class'G',130 cu ft PF'C' 119' 7" 26# L-80 4318' 11812' 3830' 8638' 8-1/2" 553 cu ft LiteCrete,180 cu ft Class'G',893 cu ft Class'G' 4-1/2" 12.6# L-80 11644' 13978' 8519' 8688' 6-1/8" Uncemented Slotted Liner 24. Open to production or injection? Yes 0 No IZI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 4216'-11646' 11528'/8436' yy,,i'.. '. 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. ul ' 1,,'4,',41:.: Was hydraulic fracturing used during completion? Yes 0 No I I ' Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attachment 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ....► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate ........ Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only vi- /o/Z3//5—A/ ."---- RBDWISI?_g OCT 0 9 2013r00.,7 -""ja 28. CORE DATA • Conventional Core(s) Yes LI No RI r Sidewall Cores Yes 0 No RI • • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No Q Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Sag River 11820' 8644' AAC 25.071. Shublik 11931' 8690' Base of Sag River(Invert) 11965' 8693' Base of Sag River(Revert)/ 13860' 9299' Shublik Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Report,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nocas,Noel Email: Noel.Nocas@bp.com Printed Name: Joe LastuAN Title: Drilling Technologist Signature: 111 V 1 Phone: +1 907 564 4091 Date: 10 J7/15 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only • • WELL NAME: F-19A 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 11590' Set Cement Retainer 11481' 84 Bbls Class 'G' 11433' - 11438' Tubing Punch 10004' 42 Bbls Class 'G' 4216' Cut & Pull Tubing 146' Cut & Pull 9-5/8" Casing 4194' Set Whipstock • • F-19A, Well History (Pre-Rig Sidetrack) 4e ib ; +9 T/I/O=SSV/1800/0+, Temp=Sl. PPPOT-T(PASS), iPPOT-IC (PASS), Pre RWO. PPPOT-T: Stung into test void (0+ psi), bled void to 0 psi. Functioned LDS, all moved freely(1"). Pumped through void, good returns. Pressured test void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test void (100 psi), bled void to 0 psi. Functioned LDS, all moved freely(1"). Pumped through void, good returns. Pressured test void to 3500 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void 6/10/2015 to 0 psi. T/I/O = 1600/1880/0. Temp = SI. TBG & IA FL (Slickline call in). AL SI @ casing valve (450 psi). TBG FL @ 10460' (159 bbls). IA FL @ 4105' (#3, dome, 220 bbls). Slickline in control of all 7/12/2015 wellhead valves at time of departure. 1500 hrs. T/1/0=2000/1800/0 Temp= S/I Assist slickline MIT-IA to 2500 psi in progress. (SIDETRACK) 7/12/2015 Pumped 5 bbls meth followed by 115 bbls of 70*crude down IA to load. RAN 3'x 1 7/8"W.B. 3.70" CENT, 1 3/4" S.BAILER, STOP DUE TO DEVATION @ 11917' SLM, SAW NO RESTRICTIONS, EMPTY S.BAILER. SET SLIP STOP CATCHER (ser-43) @ 4200' SLM. PULL ST#3 ( 1" BK- DOME) ©4093' SLM/4105' MD. RUN 4.5" OK-6 ( 1" BK- DMY GLV) 7/12/2015 (currently in-hole). SET ST#3 ( 1" BK-DGLV) ©4093' SLM/4105' MD. MIT IA TO 2500 PSI ( pass ). PULL SLIP 7/13/2015 STOP CATCHER FROM @ 4200' SLM. MIT-IA to 2500 psi **PASSED** Continued to pump 145 bbls (total of 260 bbls) crude down IA to load. Pumped 6 bbls 70*crude down IA to reach test pressure. 1st 15 min IA lost 23 psi. 2nd 15 min IA lost 19 psi for a total loss of 42 psi in 30 min. Bled back— 3 bbls. Tags hung on IA and wing valves. **AFE**sign hung on MV. Slickline in control of valves upon departure. IA OA= OTG. 7/13/2015 FWHPS=1670/50/vac. T/I/O= 1632/vac/vac Temp= S/I Assist E-Line (SIDETRACK) MIT-T to 2500 psi (FAIL) (3 ATTEMPTS) ( IN PROGRESS) Pumped 6 bbls meth spear followed by 302 bbls of 112*f seawater down TBG to load well. Pumped 72 bbls of DSL down tubing for Freeze protect Pumped 35 bbls 7/14/2015 Diesel down tubing to reach test pressure. INITIAL T/I/O = 1300/0/0. MIRU. ARM CEMENT RETAINER. STAB ON FOR PT. LRS L&K WITH 3 BBL METH SPEAR, 290 BBLS SEWATER, 70 BBLS DIESEL FREEZE PROTECT. RIH WITH CEMENT RETAINER TOOLSTRING. SET CEMENT RETAINER AT 11,590'. CCL TO ME = 19.7'. CCL STOP DEPTH = 11570.3'. GOOD INDICATION AT SURFACE. SET DOWN ON CEMENT RETAINER TO CONFIRM. TIED INTO TUBING TALLY DATED 16-FEB-2009. POOH. CONFIRM 7/14/2015 SHOT AT SURFACE. RDMO. FINIAL T/I/O =VAC/400/0. T/I/O=2398/243/vac MIT-T to 2500 psi ** PASS** Pumped a total of 1 bbls Diesel down Tubing to reach test pressure TBG lost 23 psi 1st 15 min & 19 psi 2nd 15 min for total loss of 42 psi over 30 7/15/2015 min test** FWHP=997/47/vac. CTU#9 1.75" CT Objective: Plug &Abandon. MIRU. MU & RIH with HES Cement Stinger. Sting into retainer at 11,583, pressure up on CTBS to 500psi, did not see any pressure response on the CT. Perform injectivity test at 1, 2, 2.4, and 2.8 BPM, could not catch pressure below 2.0 BPM, no pressure response on TBG while pumping through retainer. Line up cementers down CT, pump 83 bbls of class G cement through retainer, slowly backed off rate as pressure started climbing when cement filled liner. Final pump pressure was 947psi at .7 BPM. Pull stinger out of retainer and lay in 7/26/2015 1 bbl of cement. PUH 200', reverse out CT with diesel for cleanup. RDMO. T/I/O= SI/150/0-Conducted PJSM, walked down safe out, Start Barriers list MV, SSV. Removed spacer between FL and WV flange. Installed 4" slip blind between FL and WV. Torqued to API 8/9/2015 Spec. RDMO. FWHP= SI/150/0. T/1/O=S1/150/0 PT'D SLIP BLIND TO 300 LOW, 5000 HIGH (PASSED) CHARTED AND RETAINED. 8/10/2015 RDMO. 3' x 1 7/8" stem, 3.50" cent, SAMPLE BAILER 2.50" RAN TAG CEMENT @ 11448' SLM/11481' MD, RECOVERD. PASSING MIT-T TO 2500psi SEE DATA TAB. RUN 2.80" CENT&PDS MTT LOG 8/11/2015 currently in-hole). • ! F-19A, Well History (Pre-Rig Sidetrack) 8/11/2015 T/1/0=S1 MITT 2500 psi (SIDETRACK) Job cancelled enroute 8/12/2015 RAN PDS MTT(good data). (SLB ELINE -TUBING PUNCH). INITIAL T/I/O = 200/150/0 PSI. RUN 1: RIH WITH TUBING PUNCH. PUNCH TUBING OVER INTERVAL 11433.5' - 11438.5'/CCL TO TOP SHOT= 5.63'/ CCL STOP DEPTH = 11427.87'. LOG TIED INTO 4.5" TUBING TALLY DATED 16-FEB-2009. PUMP ON TUBING WITH TRIPLEX. IA TRACKING WITH TUBING. CONFIRM SHOT AT 8/12/2015 SURFACE. FINAL T/I/O = 300/200/0 PSI. Open Work Permit w/DSO. MIRU SLB w/CH2MHill as support. Hold PJSM to discuss Job Scope. Perform Low and High Pressure Tests. Start pumping CMT job w/ 10 bbls 50/50 Methonal, 260 bbls Fresh Water, 190 bbls DSL, 180 bbls Fresh Water, 42 bbls of 15.8 ppg Class"G"CMT, 109 bbls Fresh Water, and 47 bbls DSL. CIP @ 18:21 hrs. Estimated TOC @ 10,185' MD. Estimated Length of CMT Plug @ 1249'. UCA-2000 psi @18:37 hrs. FWHP T/IA/OA=450/240/10 psi. SV, 8/16/2015 SSV, WV-Closed MV-Open OA, IA-OTG. TAG TOC @ 10,004' SLM W/2.50" SAMPLE BAILER (Sample of cement). BRUSH BPV PROFILE 8/21/2015 & DRIFT TO 4,600' SLM W/4-1/2" BRUSH, 3.70" G-RING. T/I/0= 200/0/0 Temp= SI CMITxIA( Pre RWO ) **PASS** Pumped 5 bbls meth and 2 bbls Diesel down IA to achieve test pressure TBG/IA lost 26/13 psi 1st 15 min & 17/7 psi 2nd 15 min for total loss of 43/20 psi over 30 min Bled TBG/IA to 0 psi per E-Line request (—4 bbls ) E-Line in control of well upon departure FWHP's= 0/0/0 AFE sign already on MV Caution tags hung on IA 8/21/2015 &WV. (ELINE TUBING CUT). INITIAL T/I/O = 0/100/0 PSI. MIRU ELINE EQUIPMENT. MAKE UP 8/21/2015 CUTTER TOOL STRING AND RIH. PULLING INTO CUT DEPTH W/3.65"JET CUTTER. JET CUT TBG @ 4190'ELM, CCL TO CUTTER: 14.2, CCL STOP DEPTH: 4175.8, CORR TO TBG TALLY DATED 16-FEB-2009. SAW GOOD PSI CHANGE FROM IA TO TBG. RDMO, TURNED 8/22/2015 WELL OVER TO PAD OP. FINAL T/I/O = 50/0/0 PSI. T/1/0=24/0/0. [Obj: Pre RWO]. CMIT TxIA to 2500 psi, Pumped 4.72 bbls of diesel to reach test pressure, 1st 15 min TxIA lost 61/62 psi, 2nd 15 min TxIA lost 26/26 psi, total loss of 87/88 psi in 30 min test**PASS**. MIT-OA to 2000 psi, Pumped 2.26 bbls of diesel to reach test pressure, 1st 15 min OA lost 57 psi, 2nd 15 min OA lost 24 psi, total loss of 81 psi in 30 min test**PASS**. FWHP 8/22/2015 410/400/15 Fluid packed annuals sign hung. SV,WV,SSV=closed IA,OA=OTG. T/I/0=400/400/0. Start barriers list= SSVxSV. Install dry-hole tree conversion. RU CIW lubricator w/4" H-plug TWC#295 and stabbed onto tree. Ran down and tagged @125". Set TWC and confirmed LTT. RD lubricator. RD upper 4" CIW tree and NU dry-hole tree with temp. SV#15 Torqued and PT'd to API specs. installed temp piggyback valves IA 2" (#93) and OA 3" (#18). 8/29/2015 Torqued and PT'd to API specs. RDMO. Note: Bled tubing and IA pressure. Final T/1/0= TWC/0/0. . • • North America-ALASKA BP Page 1 Operation Summary Report` Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual©82.23usft(above Mean Sea Level) Date j From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/31/2015 06:00 - 07:00 1.00 G P PRE LOWER DERRICK I*BEGIN RON EVENT AT 06:00 ON 8/31/15 WITH I PARKER 273 RIG. PJSM AND LOWER DERRICK CHECKLISTS 1-LOWER DERRICK 07:00 - 14:00 7.00 RIGD P PRE RIG DOWN -SECURE PIPE SHED CLEAN AND CLEAR WELL HOUSE I DISCONNECT INTERCONNECTS BETWEEN /I MODULES PREPARE MODULES FOR SEPARATION I-SEPARATE MODULES 14:00 - 16:00 2.00 MOB P PRE IMOVE MUD MODULE FROM H-PAD TO GC2 -MOVE MUD MODULE FROM H-PAD TO GC2 11 I STAGING AREA ADDITIONAL AREAS IDENTIFIED AS I I NEEDING RIG MATS j I I-TOOL SERVICE MAT SOFT AREAS ON H-PAD ACCESS ROAD 16.00 - 20:00 4.00 MOB P PRE MOVE DRILL AND UTILITY MODULE FROM H-PAD TO GC2 !-MOVE DRILL AND UTILITY MODULE FROM H-PAD TO GC2 STAGING AREA STOP MOVING UTILITY MODULE.TOOL SERVICE MAT SOFT AREAS APPROACHING GC2 AFTER DRILL MODULE PASSED. -DRILL MODULE CONTINUE TO GC2 20:00 - 22:30 2.50 MOB P PRE LAY MATS AND MOVE MODULES TO GC2 -LAY RIG MATS ON GC2 ACCESS ROAD BETWEEN GC2 STAGING AREA AND SPINE ROAD. -LAY RIG MATS ON SPINE ROAD TO J PAD. -CONTINUE TO MOVE UTILITY MODULE TO GC2 STAGING AREA. 22:30 - 00:00 1.50 MOB P PRE LAY MATS AND STAGE MODULES AT GC2 -ALL MODULES AT GC2 STAGING AREA WAITING ON MATTING TO J PAD. 9/1/2015 00:00 - 12:00 12.00 MOB P PRE MODULES STAGED AT GC2 I-TOOL SERVICES LAYING RIG MATS ON SPINE ROAD I-CHANGE OUT WASHPIPE ON TOP DRIVE 12:00 - 15:00 3.00 MOB P PRE I MOVE MODULES FROM GC2 TO J PAD -MUD MODULE MOVED FIRST -DRILL MODULE AND UTILITY MODULE MOVED TOGETHER Printed 9/14/2015 10:06:03AM . • • North America-ALASKA-BP Page 2 e l9 Operation Summary Report Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 ' End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. I UWI:500292062900 Active datum:F-19B Actual @82.23usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) I 15:00 - 00:00 1 9.00 1 MOB P PRE MODULES STAGED AT J PAD TOOL SERVICES LAYING RIG MATS FROM J 'PAD TO F PAD ACCESS ROAD.DISTANCE 1.8 MILES. -APPROXIMATELY 1200 MATS REQUIRED TO I'i COVER ROAD SURFACE -4 BED TRUCKS AND 4 LOADERS LAYING IMATS -SERVICE CUTTINGS AUGER PERFORM PREVENTATIVE MAINTENANCE ON RIG EQUIPMENT '-INSPECT AND SERVICE COLUMBIA MOVING SYSTEM -CLEAN AND ORGANIZE RIG 9/2/2015 00:00 - 16:30 16.50 MOB P PRE MODULES STAGED AT J PAD -TOOL SERVICES LAYING RIG MATS FROM J PAD TO F PAD ACCESS ROAD 16:30 - 18:30 2.00 MOB N WAIT -0,94 PRE WAITING ON UNKNOWN EMERGENCY BETWEEN GC1 AND GC2 -OTL REQUESTED SPINE ROAD REMAIN CLEAR FOR POSSIBLE EMERGENCY TRAVEL. OTL:RICHARD FAUSETT AND DAVE `HILDRETH. -MODULES PREPARED TO MOVE TO j INTERSECTION OF F PAD ACCESS ROAD AND SPINE ROAD -RIG MATS IN PLACE ON F PAD ACCESS ROAD 18:30 - 22:30 4.00 MOB' I P PRE MOVE MODULES TO INTERSECTION OF F PAD ACCESS ROAD AND SPINE ROAD ' I I-MOVE MUD MODULE FIRST -MOVE DRILL MODULE AND UTILITY MODULE : TOGETHER 22:30 - 00:00 1.50 MOB P PRE MODULES STAGED AT F PAD ACCESS ROAD INTERSECTION -TOOL SERVICES LAYING RIG MATS ON F PAD ACCESS ROAD 9/3/2015 00:00 - 09:00 9.00 MOB P PRE MODULES STAGED AT INTERSECTION OF SPINE ROAD AND F PAD ACCESS ROAD -TOOL SERVICES LAYING RIG MATS ON F PAD ACCESS ROAD ' -CLEAN AND ORGANIZE RIG 1 + -CLOSE OUT MAINTENANCE WORK ORDERS 09:00 - 12:00 3.00 MOB P PRE MOVE MODULES TO Y ON F-PAD ACCESS : I ROAD I ' I-ASSIST PEAK CRANE CREW MOVING __ I DUMMY WELLHOUSE ONTO F-19B 12:00 - 14:30 2.50 MOB P PRE MODULES STAGED AT Y ON F PAD ACCESS I 1ROAD I -TOOL SERVICES LAYING FINAL RIG MATS -PERFORM RIG MAINTENANCE PROJECTS -SPOT DUMMY WELLHOUSE ONTO F-19B 14:30 - 19:00 4.50 MOB P PRE I MOVE MODULES TO FAR SIDE OF PAD.MUD MODULE MOVED FIRST. ***SIMOPS:CHANGE OUT#2 SHAKER BED*** Printed 9/14/2015 10:06:03AM S • North America-ALASKA-BP Page 3,p49 Operation Summary Report Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. I UWI:500292062900 Active datum:F-19B Actual @82.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 19:00 - 23:00 4.00 MOB P PRE SPOT MODULES OVER WELL -TURN TIRES AND REMOVE TIE RODS. !-MATE MUD MODULE WITH DRILL MODULE -INSTALL ROOF TOP WALKWAYS AND PIPESHED TRANSITIONS. -HOOK UP ELECTRICAL AND UTILITY INTERCONNECTS BETWEEN UTILITY MODULE AND DRILLING MODULE RAISE DRIVERS'CABS SPOT CUTTINGS BOX 23:00 - 23:30 0.50 MOB P PRE RAISE DERRICK - PJSM,DERRICK INSPECTION,PRE-DERRICK RAISE CHECKLIST. -DERRICK PULLED 495K OFF THE RACK 23:30 - 00:00 0.50 RIGU P PRE SKID FLOOR -PJSM SKID RIG FLOOR TO DRILLING POSITION 9/4/2015 00:00 - 06:00 6.00 RIGU P PRE I RIGGING UP -FINISH CONNECTING LINES AND I INTERCONNECTS -RIG DOWN BRIDAL LINES -FILL PITS WITH SEAWATER -INSTALL OFFLINE MOUSE HOLES **ACCEPT RIG ON 09/04/2015 AT 06:00** 06:00 - 09:00 3.00 RIGU P PRE TEST TWC -RIG UP -PASSING PRESSURE TESTS ON THE TWC FROM ABOVE AND BELOW:250PSI LOW FOR 5 MINUTES AND 3500PSI HIGH FOR 5 MINUTES 09:00 - 11:00 2.00 RIGU P PRE NIPPLE DOWN TREE AND ADAPTER FLANGE -BLEED OFF HANGER VOID -CLEAN AROUND HANGER AND LOCKDOWNS -WSL VERIFIED 8-1/4 TURNS TO MAKE UP TCII XO TO HANGER -NO VISUAL DAMAGE TO HANGER THREAD 11:00 - 15:30 4.50 BOPSUR P PRE NIPPLE UP BOP -PICK UP 16'RISER AND STAB ONTO WELLHEAD -PICK UP BOP AND STAB ONTO RISER -INSTALL BELL NIPPLE AND AIR BOOT -OBTAIN RKB -INSTALL MOUSE HOLE 15:30 - 16:00 0.50 BOPSUR j P PRE CHANGE RAMS -REPLACE 2-7/8"X 5-1/2"VBR WITH 7"IN UPPER CAVITY -ENERGIZE ACCUMULATOR 16:00 - 18:00 2.00 BOPSUR P PRE !TEST BOP -INSTALL TEST JOINT INTO HANGER WITH XO -PURGE AIR FROM SYSTEM -PERFORM BOP BODY TEST 18:00 - 18:30 0.50 RIGU P PRE RIG EVACUATION DRILL -CREW RESPONSE TIME:3 MINUTES 20 SECONDS HOLD AFTER ACTION REVIEW Printed 9/14/2015 10:06.03AM • • North America-ALASKA-BP Page 44- Operation Summary Report Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual @82.23usft(above Mean Sea Level) Date From-To Hrs � Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 18:30 - 00:00 5.50 BOPSUR P PRE PRESSURE TEST BOP -TEST BOP ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES -PRESSURE TEST BOP RAMS TO 250 PSI, 13500 PSI FOR 5 MINUTES EACH 1-PRESSURE TEST BOP ANNULAR PREVENTER TO 250 PSI,3500 PSI FOR 5 1 MINUTES EACH WITH 4"TEST JOINT 1-TEST UPPER 7"FIXED RAMS WITH 7"TEST (JOINT -TEST LOWER VBRS WITH 4"AND 4-1/2" TEST JOINTS -ALL TESTS CHARTED -BOP CONFIGURATION FROM TOP TO BOTTOM:ANNULAR PREVENTER,T'FIXED RAMS,BLIND SHEAR RAMS,MUD CROSS, 2-7/8"X 5-1/2"VBRS '(CONTINUES TO 9/5/2015 REPORT) **AOGCC:WITNESS WAIVED BY JEFF JONES ON 9/4/15** 9/5/2015 00:00 - 00:30 0.50 BOPSUR I P DECOMP (CONTINUE FROM 9/4/2015) PRESSURE TEST BOP i-TEST BOP ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES 1-PRESSURE TEST BOP RAMS TO 250 PSI, 13500 PSI FOR 5 MINUTES EACH 1-PRESSURE TEST BOP ANNULAR I PREVENTER TO 250 PSI,3500 PSI FOR 5 I MINUTES EACH WITH 4"TEST JOINT -TEST UPPER 7"FIXED RAMS WITH 7"TEST • JOINT 1-TEST LOWER VBRS WITH 4"AND 4-1/2" ITESTJOINTS -ALL TESTS CHARTED BOP CONFIGURATION FROM TOP TO BOTTOM:ANNULAR PREVENTER,7"FIXED RAMS,BLIND SHEAR RAMS,MUD CROSS,2 7/8"X 5.1/2"VARIABLE RAMS I 1(CONTINUES TO 9/5/2015 REPORT) **AOGCC:WITNESS WAIVED BY JEFF JONES ON 9/4/15** 00:30 - 01:00 0.50 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT -BLOW DOWN TEST LINES 01:00 - 03:30 2.50 WHSUR P DECOMP PICK UP DUTCH RISER -INSTALL DUTCH RISER -RIG UP AND PRESSURE TEST LUBRICATOR 250 PSI LOW 3,500 PSI HIGH(GOOD TEST) '1-RETRIEVE TWC ;-WELL OUT OF BALANCE ANNULUS ON A 'VACUUM TUBING DISCHARGING DIESEL. Printed 9/14/2015 10:06.03AM • North America-ALAS Page S,q�S .sr KA BP 3 Operation Summary Report Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AMI Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual @82.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) I (usft) 03:30 - 04:00 0.50 CONDHL P DECOMP PJSM LINE UP SURFACE LINES AND LINE UP RETURNS TO TIGER TANK. DISPLACE FREEZE PROTECT DIESEL FROM 'WELL BORE WITH SEAWATER -PUMP 300 BBLS OF SEAWATER TO TIGER ,TANK TO DISPLACE WELL BORE OF DIESEL. -8 BPM @ 920 PSI I-RECOVERED 147 BBLS OF FREEZE PROTECT DIESEL FROM WELL 04:00 - 05:00 1.00 WHSUR P DECOMP 'PJSM RIG DOWN LUBRICATOR AND DUTCH RISER -LAY DOWN LUBRICATOR AND TOOL BIN FROM FLOOR !-LAY DOWN DUTCH RISER INTO PIPESHED 05:00 - 06:00 1.00 PULL P DECOMP PJSM MAKE UP LANDING JOINT TO HANGER 8.25 TURNS 1-MAKE LANDING JOINT UP TO TOP DRIVE -BACK OUT LOCK DOWNS AS PER FMC IPROCEDURE -PULL HANGER OFF SET @ 82 K 06:00 - 06:30 0.50 PULL P DECOMP ;PJSM CIRCULATE SURFACE TO SURFACE ,VOLUME -PUMP @ 10 BPM,230 PSI -RIG UP DOYON CASING TONGS -MONITOR WELL FOR 10 MINUTES(STATIC) 06:30 - 10:30 4.00 PULL P DECOMP PULL HANGER TO RIG FLOOR AND LAY DOWN -LAY DOWN TUBING 4,100'MD TO SURFACE CUT JOINT#98=27.05,FLARE=4.75"OD 10:30 - 11:00 0.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -C/O ELEVATORS -LAY DOWN DOYON CASING TONGS 11:00 - 11:30 0.50 CUT P--- ' ' DECOMP ADD OIL TO TOP DRIVE -TROUBLE SHOOT PRESSURE SWITCH 111:30 - 13:30 2.00 CUT P DECOMP PICK UP BAKER CUTTER BHA TOOLS 1-LOAD RIG FLOOR WITH BHA -RIG UP FILL UP HOSE AND CIRCULATING LINES 13:30 - 14:00 0.50 CUT P DECOMP 'RIG SERVICE -CHANGE OUT DIES ON ST-80 -GREASE RIG FLOOR EQUIPMENT 14:00 - 14:30 0.50 CUT P DECOMP PJSM WITH BAKER PERSONNEL ON PICKING UP BHA -PICK UP MULTI STRING INSIDE CUTTER 14:30 - 15:30 1.00 CUT P DECOMP RIH WITH 4"DP 1-FILL PIPE WITH FILL UP HOSE TAKING PRECAUTIONS NOT TO GET SEAWATER IN ANNULUS I-AT CUTTER DEPTH,FILL WELL BORE WITH DIESEL THROUGH IA VALVE SET CUTTER ON DEPTH -LOCATE CASING COLLAR @ 165'MD -PICK UP 19'TO 146'MD 15:30 - 16.00 0.50 CUT P DECOMP CUT 9 5/8"CASING AS PER BAKER REP 1-80 RPM,2-5K TORQUE -STAGE PSI UP IN 100 PSI INCREMENTS TO 1500 PSI -NO CIRCULATION Printed 9/14/2015 10:06:03AM 110 I North America-ALASKA-BP Page 6 Q* Operation Summary Report Common Wet Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 I End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-198 Actual @82.23usft(above Mean Sea Level) Date From-To Firs Task ' Code NPT NPT Depth •• Phase Description of Operations (hr) (usft) 16:00 - 16:30 0.50 CUT P DECOMP I MONITOR WELL FOR 10 MINUTES(STATIC) 1-POH WITH CUTTER ASSEMBLY -USE MUD BUCKET WITH HOSE TO PIPE RACK TO KEEP SEAWATER OUT OF ANNULUS LAY DOWN CUTTER ASSEMBLY -CLEAR AND CLEAN FLOOR 16:30 - 18:00 1.50 WHSUR 1 P DECOMP PJSM MAKE UP FMC PACK OFF RETRIEVAL TOOL ENGAGE PACK OFF -ENSURE ANNULUS PRESSURE 0 BACKOUUT LOCK DOWNS PACK OFF PULLED FREE -PULL PACK OFF TO FLOOR AND LAY DOWN 18:00 - 20:00 2.00 PULL P DECOMP PJSM PECK UP SPEAR -ENGAGE 9 5/8"HANGER -PULLED 25K OVER TO FREE 9 5/8"CASING -PULL HANGER TO RIG FLOOR -LAY DOWN HANGER,2 JOINTS OF 9 5/8" CASING,1 CUT JOINT 20.21' CLEARAND-CLEANRIG FLOOR 20:00 - 22:30 2.50 CASING P DECOMP I PJSM FILL WELL BORE WITH DIESEL -RIH WITH TEST PLUG AS PER FMC REP j-RUN IN LOCK DOWN SCREWS PRESSURE TEST WELL BORE 250 PSI LOW, 5 MINUTES,2190 PSI HIGH FOR 30 MINUTES. -TEST PASSED CALLED ODE WITH RESULTS, I RECEIVED PERMISSION TO PROCEED -BLOW DOWN TEST LINES AND EQUIPMENT I-BACK OUT LOCK DOWN SCREWS -LAY DOWN TEST PLUG 22:30 - 00:00 1.50 CLEAN P DECOMP PJSM WITH BAKER REPS -PICK UP AND MAKE UP DRESS OFF ASSEMBLY TO DRESS OFF CUT ON 9 5/8" I CASING 9/6/2015 00:00 - 02:00 2.00 CLEAN P DECOMP DRESS OFF 9 5/8"CASING STUMP AS PER BAKER REP -80 RPM WITH 5K TORQUE NO CIRCULATION 02:00 - 02:30 0.50 CLEAN P DECOMP POH I-LAY DOWN DRESS OFF ASSEMBLY 02:30 - 04:00 1.50 CLEAN P DECOMP 1PJSM P/U SCOOP ASSEMBLY -PICK UP DM SCOOP GUIDE ASSEMBLY W/ IFLUID BARRIER -RIH ENGAGE NOV CSG PATCH WITH SEAL SET DOWN 10K,PU 20K TO ENGAGE PATCH -WORK UP ON OVER PULL IN 5K 'INCREMENTS TOOL SHEARED @ 25K OVER PULL. POH LAY DOWN SETTING TOOL 04:00 - 04:30 0.50 CLEAN P WEXIT I LOAD RIG FLOOR WITH BAKER CLEAN OUT BHA 04:30 - 07:00 2.50 CLEAN P WEXIT PJSM PICKING UP CLEAN OUT BHA -PICK UP CLEAN OUT BHAAS PER BAKER I REP AND BHA SHEET -P/U 9 EACH 6.5"DRILL COLLARS -P/U 20 JOINTS OF 5"HWT DRILL PIPE '-BHA WT=83K@890' i I 07:00 - 07:30 0.50 CLEAN P WEXIT I CLOSE ANNULAR,LINE UP SURFACE LINES TO TIGER TANK -CIRCULATE DIESEL OUT OF WELL BORE TO TIGER TANK Printed 9/14/2015 10:06:03AM • North America-ALASKA B 7‘"„ ✓� .. • Page 7�L9 Operation Summary Report f Common Well Name:F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 ! Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual @82.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth i Phase I Description of Operations (hr) _ (usft) 07:30 - 12:00 4.50 CLEAN P WEXIT RIH WITH 8.5”CLEAN OUT ASSEMBLY FROM 890'MD TO TUBING STUB AT 4216'MD -RIH ON ELEVATORS PICKING UP 4"DRILL PIPE FROM PIPE SHED -PERFORM KICK WHILE TRIPPING DRILL. 12:00 - 13:00 1.00 CLEAN P WEXIT CIRCULATE BOTTOMS UP @ TOP OF TUBING CUT AT 4216'MD I-142 SPM/550 GPM @ 1,350 PSI I-MONITOR WELL FOR 10 MINUTES(STATIC) -UD TOP SINGLE OF DRILL PIPE 13:00 - 14:00 1.00 CLEAN P WEXIT PJSM CUT AND SLIP DRILLING LINE '-CUT 12 WRAPS 100'OF DRILLING LINE -RE-CALIBRATE BLOCKS AND AMPHION SYSTEM CHECK CROWN-O-MATIC 4- 14 00 15 30 1.50 CLEAN P I WEXIT POH ON ELEVATORS W/4"DP @ 200 FPM, F/4200'TO 900' -P/U=118K S/O=100K -MONITOR WELL ON TRIP TANK(CORRECT DISPLACEMENT) MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING BHA INTO STACK(STATIC) 15:30 - 17:30 2.00 CLEAN P WEXIT PJSM RACK BACK 5"HWDP,AND DC IN DERRICK LAY DOWN CLEAN OUT BHAAS PER BAKER REP. -CLEAN AND CLEAR RIG FLOOR -INSTALL 12.25 WEAR BUSHING 17:30 - 20:30 3.00 STWHIP P WEXIT PJSM,PICK UP WHIPSTOCK BHAAS PER BAKER REP TO 106'MD -SCRIBE WHIPSTOCK TO MWD TOOL RIH WITH 6"DC'S AND 5"HWDP TO 952'MD I-BHA WT=P/U 90K S/O=80K -SHALLOW TEST MWD FIRST STAND OF DRILL PIPE(GOOD SIGNAL) 20:30 - 21:00 0.50 STWHIP P WEXIT LUBRICATE RIG,C/O HOSE ON ST-80, EASE RIG FLOOR EQUIPMENT 21:00 - 00:00 3.00 STWHIP P WEXIT RIH WITH WHIPSTOCK FROM 952'MD TO 4160'MD -FILL PIPE EVERY 20 STANDS -PICK UP=120K,SLACK OFF=105K 9/7/2015I 00:00 - 01:00 1.00 STWHIP ! P WEXIT ORIENT AND SET WHIPSTOCK AS PER BAKER REP AND SLB DD/MWD ORIENT ON MWD SET AT 54 DEGREES RIGHT P/U 120K,S/O 103K AT 4198'MD -SET ANCHOR ON TUBING STUB WITH 20K SLACK OFF I-PICK UP 10K OVER TO CONFIRM ANCHOR SET I-SLACK OFF 40K TO SHEAR MILLS OFF WHIPSTOCK -BAKER REP AND SLB DD ON RIG FLOOR 01:00 - 01:30 0.50 STWHIP P WEXIT DISPLACE SEAWATER TO 9.6PPG MILLING FLUID FROM 8.5PPG SEAWATER -PUMP 30 BBL HI-VIS SPACER -DISPLACE WELLBORE TO 9.6PPG MILLING FLUID AT 600GPM AND 1515PSI -OBTAIN SPR.MP#1:30 SPM- 222PSI,40 SPM=270PSI;MP#2:30 SPM=220PSI,40 SPM=275PS1 -MD=4214;TVD=3720;MW=9.6 Printed 9/14/2015 10:06:03AM 110 North America-ALASKA-SP P 80.10, Operation Summary Report Common Well Name.F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time.9/5/1981 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual©82.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 10:00 8.50 STMILL P WEXIT MILL WINDOW AND RATHOLE PER BAKER REP `�pV, -ESTABLISH MILLING PARAMETERS -MILL WINDOW FROM 4194'MD TO 4233'MD: 30'OF NEW HOLE FROM MIDDLE OF WINDOW -CIRCULATE HI VIS PILL WITH SUPER SWEEP SURFACE TO SURFACE WHILE DRILLING THE LAST 10FT OF NEW HOLE P/U=118K,S/0=106K,ROT=110K -550GPM,1145PSI -80-110 RPM 3.5K TORQUE OFF,6-10K TORQUE ON -WINDOW CLEAN:RAN THROUGH WINDOW 'WITH AND WITHOUT PUMPS AND ROTATION TOP OF WINDOW:4194'MD MIDDLE OF WINDOW:4203'MD BOTTOM OF WINDOW:4211'MD 10:00 - 11:30 1.50 STWHIP P WEXIT PERFORM LEAK OFF TEST PICK UP INTO THE SHOE.3780'TVD.4202' MD -MUD WEIGHT:9.5 PPG 1ST LOT -PUMPED 3BBLS AT 0.25BPM,BROKE OVER AT 587 -ACHIEVED A 12.5PPG LOT 2ND LOT -PUMP 1.9BBLSAT 1BPM,PRESSURE BROKE OVER AT 654 PSI,BLEED BACK 1.9BBL ACHIEVE 12.84 PPG LOT -CONTACTED ACTING WTL KEN SCHNEIDER FOR APPROVAL FOR KICK TOLERANCE BELOW 50BBL -25 BBL KICK TOLERANCE=12.2 PPG -50 BBL KICK TOLERANCE=13.1 PPG **FOR LOT:SEE ATTACHED EXCEL CALCULATOR AND CHART** 11:30 - 12:00 0.50 STWHIP P WEXIT POH ON ELEVATORS WITH MILLING ASSEMBLY FROM 4202'MD TO 3107'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:9.5PPG IN,9.5PPG OUT -P/U=118K,S/0=103KAT 4202'MD -MONITOR WELL VIA TRIP TANK.PROPER DISPLACEMENT 12:00 - 13:00 1.00 STWHIP P WEXIT POH ON ELEVATORS FROM 3107'MD TO 952' MD -MUD WEIGHT 9.5 PPG IN,9.5 PPG OUT -P/U=100K,5/0=90K AT 3107'MD -MONITOR WELL 10 MINUTES PRIOR TO PULLING BHA INTO STACK:WELL STATIC Printed 9/14/2015 10:06.03AM North.Amenca-ALAS19kBP Page,- 9 cL�B Operation SummaryReport Common Well Name F-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/31/2015 End Date: X3-01722-C:(10,103,307.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:PARKER 273 Spud Date/Time:9/5/1981 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292062900 Active datum:F-19B Actual i 82.23usft(above Mean Sea Level) Date From-To Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:30 2.50 STWHIP P WEXIT I LAY DOWN MILLING BHA FROM 952'TO SURFACE -PJSM -LAY DOWN BHAAS PER BAKER REP I-RACK BACK 5"HWDP -LAY DOWN 6"DRILL COLLARS WINDOW MILL:1/4"UNDERGAUGE 8-3/8"MIDDLE MILL:1/8"UNDERGAUGE -8-1/2"LOWER WATERMELON MILL:IN GAUGE 8-1/2"UPPER WATERMELON MILL:IN GAUGE '-CLEAN AND CLEAR RIG FLOOR P/U=80K,S/O=80K 15:30 - 17:00 1.50 DRILL P INTI I CHANGE OUT XT-39 SAVER SUB PJSM 17:00 - 18:00 1.00 BOPSUR P INTI FLUSH STACKAND PERFORM WEEKLY FUNCTION TEST OF BOP -FLUSH BOP WITH JETTING TOOL -FUNCTION BOPS -BLOW DOWN CHOKE AND KILL LINES 18:00 - 20:30 2.50 DRILL P INTI MAKE UP BHA#7 FROM SURFACE TO 740'MD: 8.5"ASSEMBLY RIH WITH 5"HWDP TO XO FOR 4"DRILL PIPE -M/U PER SLB DD/MWD -P/U=70K,S/O=70K 20:30 - 23.30 3.00 DRILL P INTI RIH FROM 740'MD TO 3400'MD SINGLE IN WITH 30 STANDS OF 4" DRILLPIPE FROM PIPESHED -SHALLOW HOLE TEST MWD AND RSS TOOLS AT 1690'MD -P/U GHOST REAMER BETWEEN STANDS 24 AND 25 -P/U=100K,S/O=93K 23:30 00:00 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG -SERVICE TOP DRIVE BLOCKS,CROWN,AND RIG FLOOR EQUIPMENT 9/8/2015 00:00 - 02:00 2.00 DRILL P INTI RIH FROM 3,400'TO 4,233'MD -OBTAIN SPR MP#1:30 SPM=185 PSI.40 SPM=243 PSI;MP#2:30 SPM=187 PSI,40 SPM=242 PSI -4169'MD,3743'TVD,MW=9.5 -CLEAN HOLE ECD=9.77PPG Printed 9/14/2015 10:06:03AM -TREE= 4-1/16 • ecY NOTES: 4-1/2-CHROME TBG—WE.LL ANGLE CTUATOR= BAKEC >'CAN RAC F 1 9 - A .).A 70°@ 10242''""MAX DOGLEG:31.9"@ 11875'R 01.03.ELB/= 71.39' 20"CONDUCTOR — ? }....1 , B—F7-EEV= 37.13' is, - 4 I I I 2587 —9-5/8'EN PKR Max Angle= 97 @ 12057' Datum 14) N/A 9-5/8"CSG STUB — 146' = Datum TVD= 880(Y SS (09/05/15) --- 4194' —19-5/8"IAA rIPSTOCK(09/07/15) 13-3/8"CSG,72#,L-80 BUTT,ID= 12.347" — 2725' , , /At' GAS LIFT MANDRELS VA4./c., ,,,,- ,N,,,, ST PAD TVD DEV TYPE VLV LATCH PORT DATE 4-1/2"JET CL/1TBG(08/21/15) H 4216' 3 4105 3696 51 KBG2 MY BK r 0 07/13/15 TOP OF 7'SCAB LNR — 4318' l ., 2 8115 6206 50 KBG2 DW BK P. 0 06/13/13 1 10620 7769 44 KBG2 DMY BK ' 0 02/16/09 ei Minimum ID = 3.725" @ 11634' 0 *2 4318' —9-5/8"X 7"BKR ZXPN LTP w/BKR 4-1/2" HES XN NIPPLE e ,,,,, HMC LNR HGR,0=6.276" %...‘ eig 8078' —BKR TIEBACK SEAL ASSY,ID=6.18" [TOP OF 7"LNR 8078' Ile 6676' —9-5/8"X r NM)ZXPN LTP w/11PBR,D=6.276' 1171,, L ---- 8094' —19-5/8"X 7'BKR I-IMC I-GR,0=6.276" 9-5/8"WHIPSTOCK(02/02/09) — 8214' 014,0 r, 9-5/8"CSG,474,S-95 BUTT,ID=8.681' — -8214 a P..> 40,2 4-1/2'CT LNR P&A(07/26/15) —1 -10004' .. ' r SL TAGGED DAT(08/21/15) 11497' —4-1/2'IIM X NP,ID=1813' . , 4-1/2'TBG PUNCH(08/12/15) — 11433' - 11438' 6 ' 7 ,' . 41k 11528' —17"X 4-1/2"BKR S-3 PKR,ND=3.870" V, ti —.---1 11561' —14-1/2"HES X NP,ID=3.813' 4-1/2"FES EZ DRILL SVB SQZ FKR(07/14/15) — 11590' dr" TOP OF OF 4-1/2^LNR 11644' L : I 11634' —4-1/2"I G.,XN 1W,ID 3.725" = 11644' —7"X 5"HRD ZXP LTP w/12'PBR,0=4.460" 4-1/2'TBG,12.6#,13CR-80 VA M TOP, — 11646' 9. :: 11646. —4_1/2.wLEG,0=1958. .0152 bpf,D=3.958' ' 0 .. , 11668" —7'X 5"BEM FLEXLOCK LNR FiGR D=4.450' 11675' --I5"X 4-1/2"X0,0=3.93' w 7'CSG,264,L-80 BTC-M,0=6.276" — 11812 1-41 : L . PERFORATION SUF./MARY REF LOG. ' 4r. ANGLE AT TOP PEFiF:54 @ 11839' Note:Refer to 1:1-oduction DB for historical pert data SIZE SPF INTERVAL OpNSqz SHOT SQZ • 4-1/2' SLID 11839- 13935 SQZ 02/15/09 07/14/15 ", •• . 4-1/2"SLTD LNR, 12.84,L-80 13T-M, — 13978' it a•-•, .0152 bpf,ID=3.958" DATE FEV BY COM DATE 'REV BY COMMENTS MUD-DE BAY UNIT 10/08/81 PT/1-1 S1JSPE34-183 08/28/15 CJN/JRAD SL TAGGED TOC(08/21/15) WELL F-19A 02/12185 Ni 8E ORIGINAL COMPLETION 08/28/15 CLWIJM13 JET air TBG(08/21/15) PERMIT No: 2081730 12/17/94' N26RHO 09/23/15 TR/JR/0 FRE-FG UFDA 1th AFI No: 50-029-20629-01-00 02/17/09 NTES SIDETRACK(F-19A) _ SEC 2,T11N,R13E,2435'FSL&2192'FEL 08/12/15 JLS/JR4i CT Lt•IR R&A(07/26/15) 08/28/15 STF/JR4)TBG PUNCH(08/12/15) E3P Exploration(Alaska) OF Tye \ I�y, e THE STATE Alaska Oil and Gas ���► �� of 1 JJ\ S}(Ik Conservation Commission l Ittt-l=__= 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907 279 1433 OFALAsv-' Y Q 29 5 Fax 907.276 7542 SCOW MA. D www aogcc alaska goy Mary Endacott 03 - 1 ri3 Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-19A Sundry Number: 315-246 Dear Ms. Endacott: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, aid Cathy P. Foerster Chair DATED this day of May, 2015 Encl. STATE OF ALASKA RECEIVED ALA:..."OIL AND GAS CONSERVATION COMIb,..,,ION N APPLICATION FOR SUNDRY APPROVAL APR 2 3 01 20 AAC 25.280 OTS 56�/3 1 Type of Request: AOGCU ❑Abandon ®Plug for Redrill • 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations ❑Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well ❑Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5 Permit To Drill Number BP Exploration(Alaska) Inc. ['Exploratory ❑Stratigraphic 208-173 • 3 Address ®Development 0 Service 6 API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-20629-01-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU F-19A Will planned perforations require a Spacing Exception? 0 Yes No 9. Property Designatior• 10. Field/Pool(s): ADL 028280, 028277&028278 Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft). Effective Depth MD(ft) Effective Depth TVD(ft): Plugs(measured): Junk(measured) 13980' - 8688' • 13980' ' 8688' ' None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"x 30" 37'- 117' 37'- 117' Surface 2688' 13-3/8" 37'-2725' 37'-2692' 4930 2670 Intermediate 8181' 9-5/8" 33'-8214' 33'-6269' 8150 5080 Production Liner 7494' 7" 4318'- 11812' 3830'-8638' 7240 5410 Liner 2334' 4-1/2" 11644'- 13978' 8519'-8688' 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft). Tubing Size: Tubing Grade: Tubing MD(ft). Slotted Liner: 11839'- 13935' Slotted Liner: 8656'-8687' 4-1/2", 12.6# 13Cr80 11646' Packers and SSSV Type' 7"x 4-1/2"Baker S-3 Packer Packers and SSSV 11528'/8436' MD(ft)and ND(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation. May 15,2015 0 Oil ❑WINJ ❑WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative. 0 WAG 0 SPLUG 0 Suspended • 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Noel Nocas,564-4667 Printed Name: Mary ndaco Title: Engineering Team Leader Email: Noel.Nocas@bp.com Signature: dar.4-7t Phone: 564-4388 Date. /23/15 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness - 2�� Sundry Number ❑Plug Integrity it/BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other alp rt to ,3✓�� 1� a 5� (Nr/�5p rS 5 23 5p5, J et i¢vi nvla v pr-c v rvi J r 7tt5 1- fc 25-0c) P5 i Spacing Exception Required? 0 Yes17 No Subsequent Form Required: - 4 a APPROVED BY ` Approved By. aft /9)Qe.i..7(4__.- COMMISSIONER THE COMMON Date: - —l5 Form 10-403 Revised 1 2012 for 12 months from the date of app royal Submit In Duplicate 1/71-1/71- 5`5/lS , L �� f. .zg. i� DMS-- MAY 1 1 201 i-,- " F a GP6p eller Pfzidho e Sim Well Name: F-19A Well Type: Producer Current Status: Shut-In Request: P&A-Well Prep f/Rotary Sidetrack MIT-IA- pass to 3500 psi (12/15/2014) MIT-OA-pass to 1200 psi (12/14/2014) Reason for P&A and Sidetrack: This well is currently SI due to high GOR and is now the candidate well for the proposed F-19B RST. Well History: The original production well (F-19) was originally drilled in 1989 prior to a RST in 2009 (F- 19A). con cur. T fe 64e'1 `i4f yeen /,•t GO/ gird 4cf //ear dcen ab/c Other Requests: None. �*� one cr 7ro CO/7/4119e Pro�GT''0r? 6n Q /C iatI 60;5, 7075 vvfAe MASP: 2355 psi (7.0 ppg @ 8850' TVDss) TOv Estimated Pre-Rig Start Date: 04/15/2015 is Al 5 Prti y,, /f0 141 ; ;ti 6 Gam. Aeceor Pre-rig prep work: vr«ptc Elf g`ohlo of 4eve A40, 60tes i'•l 1. PPPOT-T to 5000 psi, PPPOT-IC to 3500 psi, function LDS. egCe4; ffLf- / G�6. 2. Set cement retainer at 11,600'MD and P&A slotted liner with -80bbls of 15.8ppg Class G cement k eft fd 3. Tubing punch at 11,480' MD reotr' •11 flour' 4(10" 7 4. Circulate lateral cement plug into TBG and IA with -41 bbls of Class G cement. TOC at least ; ke c�0� 10,280'MD (-1200'MD) / T 5. Jet Cut tubing at-4300' r ri"bn 6. CMIT-IA to 3500 psi, MIT-OA to 2000 psi. 4 C 7. Freeze protect the well to 2200' MD with diesel. OF / rY 8. Install TWC, NU Dryhole tree and test. %7 Proposed Rig Procedure: 1. MIRU Parker 273 2. Test TWC from above and below to 3500psi for 5 minutes 3. Nipple down tree. Nipple up BOPE. Test BOPE to 250psi low/3500psi high 4. Pull TWC. Circulate out freeze protection and circulate well to 8.5 ppg seawater. 5. RU and pull the 4-1/2" tubing from the pre-rig jet cut at -4300' MD. 6. PU 9-5/8" String cutter and RIH. Cut 9-5/8" casing below wellhead. 7. Pull 9-5/8" Casing and CMIT-IAxOA to 2000psi to confirm integrity. F-19A Sundry Application 1 4/21/2015 8. RIH with clean out assembly down to top of tubing stub. 9. PU 9-5/8"whipstock and RIH. Set whipstock on tubing stub. 10. Swap the well to the planned milling fluid and mill a window in the 9-5/8"casing plus 20' of formation. 11. Perform a LOT and POOH for drilling BHA. 12. Continue with drilling operations (see PTD application). Drilling Engineer: Noel Nocas (907) 564-5027 Production Engineer: Kirsty Schultz (907) 564-5105 Geologist: Roger Sets (907) 564-5215 F-19A Sundry Application 2 4/21/2015 TREE= 4-1/16"CIW _ ELL ACTUATOR= BAKERC >70'( 10242'2'"'MAXM X DOGLEG:319'@M11875'ANGLE OKB.ELEV= 71.38' BF.B EV= 37.93 / , 2193' —4-1/2"I IM X NP,ID=3.813" KOP= 2100 ? 20"CONDUCTORH Max Angle= 92°@ 1205T ? Datum MD= N/A ._.#, Datum TVD= 8800'SS D= ^ — 2582' —f 9-518"CN PKR GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D= 12.347" H 2725' ST MD TVD DEV TYPE VLV LATCH FORT DATE 3 . 4105 3696 51 KBG2 DOME BK r 16 01/13/15 TOP OF 7"SCAB LNR H 4318' 2 8115 6206 50 KBG2 OM1Y BK r 0 06/13/13 l 1 10620 7769 44 KBG2 [MY BK ' 0 02/16/09 Minimum ID = 3.725" @ 11634' 1 14318' — 9-5/8-X 7'BKRZXPN LTPwiBKR HMC LNR HGR U=6.276" 4-1/2" HES XN NIPPLE 1 . $07$' —{BKR TACK SEAL ASSY,D=6.18" TOP OF 7"LNR 8078' 8078' —19-518"X 7"HRD ZXPN LTP w/11'PBR,ID=6.276' 9-5/8'WHIPSTOCK(02/02/09) 8214' 8 —19-5/8*X 7"BKR HMC FGR D=6.276" 9-5/8'CSG,47#,S-95 BUTT,D=8.681" — —8214 r.. 11497' —4-1/2*HES X NP,D=3.813" �I 11528' --17"X 4-1/2"BKR S-3 PKR,D=3.870" 1156V -14-1/2"HES XNP,D=3.813" 11634' H4-1/2"HES XN NP,D=3.725" TOP OF 4-1/2'LNR —{ 11644' I 11644' H7"X 5"HRD ZXP LTP w/12'PBR D=4.460" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, — 11646' 1 111646' —4-112"WLEG,D=3.958" .0152 bpf,D=3-958" \ 11668' H 7"X 5"BKR FLEXLOCK LNR HGR D=4.450" 11675' —15"X 4-1/2"XO,D=3.93" 7"CSG,26#,L-80 BTC-M,D=6.276' 11812' ' ' , PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF:54'@ 11839' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 4-1/2" SLID 11839-13935 SLID 02/15/09 • 4-1/2"SLID LNR 12.6#,L-80 BT-M, — 13978' L .0152 bpf,D=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNfT 10/08/81 PNJ-1 SUSPENDED 01/19/15 JTG/JMD RLL PXNGLV GO(01/13/15 WELL: F-19A 02/12/85 N18E ORIGINAL COMPLET1ON 03/11/15 PJC REFORMAT PLR TALLES—F G PREP PERMT No:' 081730 12/17194 N2E5 RWO AR No: 50-029-20629-01-00 02/17/09 N7ES SIDETRACK(F-19A) SEC 2,T11N,R13E 2435'FSL&2192'FEL 04/08/10 MS/JMD DRLG DRAFT CORRECTIONS 07/02/13 TLYPJC SET PXN t GLV C/O(06/13/13) BP Exploration(Alaska) TREE- 4 1116"CM A.E.LI-EAD; FIX PRE-RIG F-1 9A SAFETY NOTTS, 4.1/2".01140111E TRG"NPR I.MIDI F ACTLATOR.-, BAKER C ).78*il III24r—IMAX COMM 31.7 a 11171 OKB ELEV,--- 71.38' 1 BF.13.EV= 37.93 . ,_.;' ''''_._.:- ._,9 A -2150' TOP OF CENANT KOP= 2100 i 2193' --4-1/2"F-ES X NIP,13=3 81r Lax Angle- gr tit 12057 I 20.C04:LICTOR H ? 1 ? I NA . lt. " ,f Iliban MP- i Cat=TVD= 880:7 SS ID= ' — 2682' -A 11-518"DJ Pot GAS LIFT WAIERELS 13 3/8-CSG,T2I,I.LKTIUTT,ID-12 347' ---1- 2725' 11 air T8G l_f_l ) -1 4300. 114 SI iAD -MD OW -TY FR VW LATCHSTE ORT DA 3 '4105 3696 51 K602 COW 13K r 16 01713/15 2 i 8115 6206 50 MG? OW BK ri0 86013)13 ice OF r SCAB LAct -1 431 fr I. i it.e I 1 110820 7769 44 103G2 Elirl BK I,' 0 0V115/09 ,c Minimum ID is 3.72V olfg 11634' -.7 0 4 . 431E lir Ur x r iiaiN—Liiiiiiiiiii l'i 1-Nc La&HCR,87=8.276' 4-1/2- HES XN NIPPLE i t: ' 807W HOKR TIEBACK SEAL ASSY,0=6.18' I 1TOP OF r,LNR -1 firTr i11.)., 8078' H9-sxr'x r mo zxiiP4' i.wv;ti-i'plikb-tiri II L 3064' --i 9-518"X 7'BKR NAG MGR V=6.278' I 318'ARPSTOCK(02102A09) H 8214' ,Q 16-51,-me.,4711.S-05 BINE D=8.68," -8214 _102.0. . ITOPOF CEMENT PLUG 1 el _ ,-11480'-- ' 14-1/T TBG RANICHI CI Li. l'i •1 L 1149r I 1 t4-112*Illai X Ni,„ID=31113' 17.4 Ir4 1162 ' 1 IT"x i trr MRS 3 Sox,El=lam I i 11681' H4 lir PIES X NP,13.3_81r , I 11600. H4-1/2'CF3/1ENT RETAINER(_1_1_J :3,61 4 11634 HA-1/2-MI XN?4'.13 17= Lict .10P 4-1.i2OF NR 11844' , 7 . C •... ' 11644' Hr x 5 148)ZXP LTPar/12'143R,13=4 4171' 4-1/2'TBG.12.81.13CR-88 VAM TOP -- 11640' 1,4,•••••• .0..CI 0152 apt,ID,3.gur g -1164r l-fe-itr All EC.ID;3 958"1 , . , Sio• A -11668' .---fr;X 5;lilari-LOCLOCX LNR17-4*8724 4.58"-'; :141:•:;ic....1; 11676' i -15-X 4-177 x0.ID=3.03. ee,4 v ,.t:er kj I r CSG,2811,L SO Bic ors 0-6278- 11812' e , r/3 V iv FERFORARON&WARY 1 • 1. 41$*j.1A REF LOG. '§; ANGI.t..AT TOPPa -m ERS- 54- lg te : ke We:Refer to Production 08 for historical perf data Xi '4, 5(A SFF' INTERVAL OpdScri SPOT SG2 1ill 41(2' SL1D111839-13935 SLID 92/15109 1 -0 ,11 ILA, I X ' 4 1/2'SI TO LNR.12.08,I.80 13T It H 1397W i---- 0157 apr r.),..3 n58- , _...... . DATE FEV BY 00661ENTS DATE WV BY COASENTS TRILHDE BAY LINT 19108181 PW-1 &RIPEN:ED 01/19/15.110,811)Ill I, PXNGI V C10(01113/15 W1.' f-19A 02/1284 RISE ORIGINAL COMPLETION 0311 115 PJC FEFCITMAT FER TA_IJIES-RG PREP Few Pb:11081730 12117104 N2E5 RNO 94'01;15 FINOLID FRE-F83 EDITS AM Pb: 50-029-20629-01-00 02(17100 TOES SIDETRACK(F-10/4) SEC 2.T11N.R13E,2435'FSL 8 219Z Fa , 04.08110 8464.11410 CRLG DRAFT CORFECTTONS ,07/02113 TOIPJC SET PXN/GLV CO(06113113) BP Exploration Obtain F-19A Sundry Application 4 4/21/2015 • PARKER 273 BOP STACK RAM TY'E 3CP l-'T;H LOCK DOWN FLANGE SHAFFER LXT DOUBLE -3C' 13 5/8-5M 13 5/8'-5M SILODEC TOF 13 5/8"-561 FLANGED BOTTOM 9 W/'(2) '1" 3L2 OPERATOR, LPPER CAATY o CNN L43 Bw NAPPER LOT 13 5/8"-5M AND `2) 14" PSLK 'W/3STR OPERATOR, 13-5,8W 511 STUDDED TOP LOWER CAVITY 3-5/8` SM FLANGED BOTTOM 0 o -4 CkILLJNG CROSS - 13 5/B"-5M/ FLANDED I © � I � 13 5/8'-5M FLANGED BOTTOM I} • F () . C D W(2) 3 I/8"-5M SIDE OUTLETS , • `J O l 11 '� 1l. KILL LINE. --- 7r elli,crp,4_7 „Illi, � 1-, tfi” Su FLEA HOSE �� •5 . ( II C I�`�X- 2-'/1y" 5M F 3-1/8" SM C S A 3-"/A" 5M FLANGED MANJAL GATE VALVE C'. .III 1-78." 511 FLANGED HYDRAULIC GATE VALVE 1 ui - -. (r.".,,,..s. , -1, - cHCKE LINE: RAM TY'E 3;7- 3-1,'8* 5M FLANGED MANUAL GATE VALVE SHAFFER LAT SINGLE 13 5/8" 5M 3-1/5" 5M FLANGED HYDRAULIC GATE 'VALVE 13 5/8--5M SF`COED T 13 5/8-- 5M FLANGED 30 30TTOM .5-1A" 5M FLEX HD`SE WI:?) '4' JL2 OPERATOR F-19A Sundry Application 5 4/21/2015 Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve / upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" V boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work)the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. V Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states"Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. PTO ,7oS - 1 ,Z3 Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday,April 23, 2015 11:05 AM To: Loepp,Victoria T(DOA) Cc: Davies, Stephen F(DOA) Subject: Sundry#314-063 for F-19A(PTD#208-173 Follow Up Flag: Follow up Flag Status: Flagged Victoria, Please cancel Sundry#314-063 for Plug for Redrill.We are submitting a new Sundry today.This was originally planned as a Coil Sidetrack, but well integrity, proximity to gas,and the risk of isolating the new well from fault related gas in the parent makes Rotary Sidetrack a better choice. Please let me know if you have any questions. Thank you, sCANMEG MAY j 4 n15 Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 wo 1„,,iii4 BP Exploration AlaskaI900 E.Benson Blvd.lRoom: 788DIAnchorage,AK 1 a • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~~ - ~ ~ 3 Well History File IdentiiFier Organizing (done) RESCAN Color Items: ~Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: J,~.,d~ iiiuiuiiuiuuu DIG TAL DATA Di kettes, No. 1 Other, No/Type: G~ ~~ R„~a~~ce~a IIIIIIIIINIIIIIII OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: Maria Date: ~s~ I Pro'ect Proofing III II~III VIII II III BY: Maria Date: ~s~ Scanning Preparation _~ x 30 = ~ + =TOTAL PAGES' 6 "Count does not include cover sheet) ' BY: aria Date: ( ~s~ Production Scannin II I II ~I II I I III I I III 9- Stage 1 Page Count from Scanned File: ~V (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ES NO BY: Maria Date: ~ ~ /D ~s~ Y V 1, Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO YYY BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II I) I II II I I III Rescanned III 111111 VIII V III BY: Maria Date: /s~ Comments about this file: o~a„~.e=Ked IIIRIIIIIIIIIIII! 10!6/2005 Well History File Cover Page.doc • � '' ' 11//�%�� T S TAT 1- �c .‘,r2_ � i t--`.te - ,,�' C r 4t C1 7 ;, .KAnu4 to a __ 333 ldest Seventh Avenue GOVERNOR SEAN1'ARNF,I,I chorage, Alaska 99501-3572 `' �� Main: 907-279.1 433 `` FBF : x. 907 2i6 1541 Satel John McMullen Engineering Team Leader a,© - t73 BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-19A Sundry Number: 314-063 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, /'L Cathy P. Foerster Chair /�- DATED this (D day of February, 2014. Encl. } STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 9 20 APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 AOGCC 1. Type of Request: ❑Abandon ®Plug for Redrill " 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension 0 Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic 208-173 - 3. Address: 6. API Number: e,Alaska 99519-6612 ®Development El Service P.O. Box 196612,Anchorage, 50 029-20629-01-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU F-19A Will planned perforations require a Spacing Exception? ❑Yes ®No - 9. Property Designatior 10.Field/Pool(s): ADL 028280,028277,028278 Prudhoe Bay Field/Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD (ft): Plugs(measured): Junk(measured): 13980' • 8688' - 13980' 8688' 11634' None Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20"x 30" 110' 110' Surface 2725' 13-3/8" 2725' 2692' 4930 2670 Intermediate 8214' 9-5/8" 8214' 6269' 6870 4760 Production Liner 7494' 7" 4318'-11812' 3830'-8638' 7240 5410 Liner 2334' 4-1/2" 11644'-13978' 8519'-8688' 8430 7500 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): Slotted Liner: 11839'- 13935' Slotted Liner: 8656'-8687' 4-1/2", 12.6# 13Cr80 11646' Packers and SSSV Type: 7"x 4-1/2" Baker S-3 Packer Packers and SSSV 11528'/8436' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal _4 BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic ®Development 0 Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation: March 15,2014 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended " 17. I hereby certify that the/,regoin• is tr - and correct to the best of my knowledge. Contact: Matt Ross,564-5782 Printed Name: Jo MAI lle; Title: Engineering Team Leader mail: ossmo@bp.com prr er, Signatur- Phone: 564-4711 Date: /(27 /fG Commission Use Only Conditi• • approval: Notify Commission so that a representative may witness Sundry Number: �`n_ oc ,3' 0 Plug Integrity E BOP Test 0 Mechanical Integrity Test 0 Location Clearance RBDM MAY V 9 2014 Other: 50p feSf f0 35-(x J ps i 7-2 (.i� p l c c kI-I pvc-c) j7 c/-- 20 AA c 25---. 112(1 Spacing Exception Required? ❑Yes 13 No Subsequent Form Required: it, — 4/ ,..7_ ejf) APPROVED BY Approved By: -��Q,•- COMMISSIONER THE COMMISSION Date:2-4, 1, Form 10-403 Revised 1 /2012 ,\ Submit In Duplicate 1 0 \ Approvea months from the date of approval , ALF Z/4-114- �''� i` i' f SsC r DT, 01(44 ,;4-, • • To: Alaska Oil & Gas Conservation Commission From: Matthew Ross CTD Engineer Date: January 27, 2014 Re: F-19A Sundry Approval Sundry approval is requested to plug the F-19A perforations as part of the drilling and completion of proposed F-19B coiled tubing sidetrack. History and current status: F-19 was originally drilled but suspended in 1981 & completed in 1985. A RWO was performed in 1994. A successful rotary sidetrack was performed in 2009. Due to the 4-1/2" slotted liner completion the well has a very high GOR and very v limited, if any future on-time. Proposed plan: Sidetrack F-19A to the F-19B location using Nordic 1 Coiled Tubing Drilling rig on or around June 7, 2014. The F-19BC sidetrack will be a single string exit through the existing 4-1/2" slotted liner and kick off horizontally into the Sag River. The proposed sidetrack is a -3155' horizontal Sag River producer, which will access Sag River reserve targets in F pad. The lateral will be completed with a 3/12" 13Cr solid by 2-7/8" 13Cr solid/slotted liner. This Sundry covers plugging the existing F-19A slotted liner via a liner top packer set post rig with slick line (alternate plug placement per 20 AAC 25.112(i)) in conjunction with using swab cups & KB packer element inside run on the completion liner inside the expandable liner & relying on an expandable liner with swellable rubber for parent isolation. • The following describes work planned and is submitted as an attachment to Form 10-403. A , schematic diagram of the proposed sidetrack is attached for reference. Pre-Rig Work (scheduled to begin March 15th, 2014) 1. S Pull PXN plug at 11,634'. Drift for whipstock. Caliper well. Mill 4-1/2" XN nipple at 11,634' to 3.80". Set a 4-1/2"Whipstock (TOWS 2. E at 12,150' ELMD). 3. F Perform injection test &freeze protect well to 2,500' with diesel 4. V PT MV, SV, WV. 5. V Set BPV pre rig. 6. 0 Remove wellhouse and level pad. Rig Work (scheduled to begin June 7th, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 1,842 psi) 2. Pull BPV and Bull Head kill well. 3. Mill 3.80" window and 10' of rathole. 4. Drill lateral: 4.5" OH, 3,155' (15 & 12° DLS planned). 5 Run primary expandable liner from - 12,200' to - 12,400' using swellable rubber as primary isolation. Run secondary expandable liner(s) across faults/loss zones as needed 6. using swellable rubber as primary isolation. Run 2-7/8"13Cr solid/slotted x 3-1/2" 13Cr solid liner leaving TOL at 7. 11,620' MD. 8. Freeze protect well to 2,500' MD. 9. Set TWC; RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull TWC. 2. Install generic GLV design. SBHPS. 3. Set liner top packer with slickline*. *Approved alternate plug placement per 20 AAC 25.112(i) 4. ASRC flowback. Matthew Ross CTD Engineer 564-5782 CC: Well File Joe Lastufka TREE= Cl4V SA. NOTES:"'4-112"CHROME TBG& "HL' 'D= E F-19A NIPPLFS""`WEiI ANGLE>TO' 11909""OIG WELL AF.TUATOR= BAKBtC NOT SHOWN 88.OW WHIPSTOCK'"` KB.B..EV= .__. 71.38' BF H_EV= 37.93 I I KOP= 8214' Max Angle= 2" 12089 219T I—4-1/2"FES X IP,D=3.813" Datum MD= 7 Datum TVD= 8800'SS 2725' FOC 13-318"CSG,72#,L-80,D=12.347" H 2725' —A GAS LIFT MAMIELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 4105 3696 51 KBG2 DMY BK r0 06/13/13 2 8115 6206 50 KBG2 DMY BK r 0 06/13/13 Minimum ID = 3.726" @ 11634' 1 10620 7769 44 KBG2 DMY BK r 0 02/16/09 4-1/2" HES XN NIPPLE 4318' —9-5/8"X 7"BKR ZXPN LTPw/BKR J HVAC LNR HGR,D=6.276" 1_I ►.►, 8078' —9-5/8"X 7"HIRE ZXPN LTP w/TEBACK SLV& BKR HMC LNR HGR,D=6.276" fl q 9-58"WHPSTOCK(02/02/09) H 8214' I .i/� .i 4 11497' H4-12"FES XNP,0=3.813" 11 11528' H 7'X 4-12"BKR S-3 PKR,D=3.870" 9-518"CSG,47#,L-80,D=8.681" 12117' fill ,, 11561' —141/2"FES X NP,D=3.813" 11634' 14-1/2"PXN PLUG(06/13/13) 11634' —{4-12"FES XN NP,D=3.725" ♦ 11644' 1--7'X 5"1-RID ZXP LTP w/TEBACK 0 SLV,13=4.460" 11648' —14-1/2"WLEG,D=3.958" 11668'J—r X 5"BKR FLEXLOCK LNR 4-1/2'TBG,12.6#,13CR-80 VAM TOP,.0152 bpf,D=3.958' -I 11646' ' HGR,D=4.450" 11675' I-5"X4-12"XO,D=3.930" \ r CSG,26#,L-80 BTC-M,D=6.276" 11812' \ \ \ \ PERFORATION SUMMARY \ REF LOG: \ \ ANGLE AT TOP PERF:54'@ 11839' \ Note:Refer to Production DB for historical perf data \ \ SIZE SPF INTERVAL Opn/Sqz DATE \ 412" SLID 11839-13935 SLID 02/15/09 \ \ \ \ \ \ \ 4-12"SLID LNR,12.6#,L-80 BT-M,.0152 bpf,D=3.958" —1 13978' I----------A DATE REV BY COMuENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/08/81 SUSPENDED 07/02/13 1TXPJC SET PXN/GLV C/O(06/13/13) VVELL.: F-19A 02/12/85 N18E ORIGINAL COMPLETION FERMI No:"2081730 12/17/94 N2E S RWO API hid: 50-029-20629-01-00 02/17/09 N7ES SIDETRACK(F-19A) SEC 2,T11 N,R13E,2435'FSL&2192'Fa. 04/08/10 MS/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) TREE= - CNV VULHEAD= FMC SA. NOTES:m4-112"CHROME TBG& AcTUAVTOR:= BAKER71.38' 19 � ORIG WELL NOT SHOWN BELOW WHIPSTOCK*** BF.ELEV= 37.93 I I KOP= 8214' Max Angle= 92"@ 12069' 2193' —I4-112"I tm X NP,D=3.813" Datum MD= - DatumTVD=-- 8800'SS 2725' -FOC 13-3/8"CSG,72#,L-80,D=12.347" H 2725' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 4105 3696 51 KBG2 DMY BK ' 0 06/13/13 2 8115 6206 50 KBG2 DMY BK ' 0 06/13/13 Minimum ID = 3.725" @ 11634' 1 10620 7769 44 KBG2 DMY BK ' 0 02/16/09 4-1/2" HES XN NIPPLE 4318' 9-5/8"X 7"BKR ZXPN LTP w/BKR • HMC LNR HGR,ID=6.276" i N 1.4 4 8078' H 9-5/8"X 7"HRD ZXPN LTP w/TIEBACK SLV& • BKR HMC LNR HGR,ID=6.276" ;44 11A1 9-5/8"WHPSTOCK(02/02/09) H 8214' "\ �� • t A 'IA, 11497' H4-1/2"HES X NP,ID=3.813" 11528' --17"X 4-1/2"BKR S-3 PKR,13=3-870" 9-5/8"CSG,47#,L-80,13=8.681" — 12117' , li, 4 ,, ,, 11561' H4-1/2"HES X NP,D=3-813" 11634' —4-1/2"PXN PLUG(06/13/13)-pull pre-rig 11634' —4-1/2"HES XN NW',13=3.725" rrB to 3.80"pre-ric! 11644' —7"X 5"HRD ZXP LTP w/TRACK i SLV,D=4.460" ft- TOL TOL 11,620'MD 11646' —14-1/2"WLEG,D=3-958" 11668' 7"X 5"BKR FLEXLOCK LNR 4-1/2"TBG,12.6#,13CR-80 V AM TOP,-0152 bpf,D=3.958" — 11646' 1 HGR,ID=4.450" \ 11675' —15"X4-112"XO,D=3.930" 7"CSG,26#,L-80 BTG-M,ID=6.276" 11812' \ \ \ PERFORATION SUMMARY \ \ REF LOG: ANGLE AT TOP PERF:54`@ 11839' \ \ Note:Refer to Roduction DB for historical perf data \ SIZE SFT NTERVAL Opn/Sqz _ DATE ` 3-1/2"x 2-7/8"XO 4-1/2" SLID 11839-13935 SLID 02/15/09 Fault 2 Fault 1 Hydraulic Ported packer colla\ 4-1/2"WS • t TOWS at 12,150'MD PI i PI ®1 \P--� s 4 \ 15,305'MD TD i \ 2-7/8"13Cr - \ ,IEI —ISItom® ��\ \ i s Cup packer 4-1/2"SLID LNR, 12.6#,L-80 ET-M,.0152 bpf,D=3.958" — 13978' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10108/81 SUSPENDED 07/02/13 TD/PJC SET PXN/GLV C/O(06/13/13) WELL: F-19' 02/12/85 N18E ORIGINAL COMPLETION 07/29/13 NWS proposed CTD sidetrack PERMIT No:'2081730 12/17194 N2 ES RWO API No: 50-029-20629-01-00 02/17/09 N7ES SIDETRACK(F-19A) SEC 2,T11 N,R13E,2435'FSL&2192'FEL 04/08/10 MS/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) i 101 01 a Ili 8 II A! II § �•� �, I 011 IIS I 1 C4 ,- i - ;1 ell ■ / u 3 a I I 1 . d p g � a d a.m ' o , m Q I-II li 1 ► Cl �■ 1 I ,,;• II CI .� II : I I . I I J >1 1 ^ I IIIc III u I = /1 11 C I 1 21= II III a 111 a L 1 II IIII Z p 0 0 :: ; OM irI 111 U. I _> 3 0 III 111 A 4 =mg g L 0 IA Ep 1 W y ,0 U LL • �� III E • • ler I : 11: : :I: ol . II N II' i I Eo W a' v re E O s il c • • I Y • Mill of N 1 N C U ce ,n > g _ i C rc NM V m - a:7 ill dion , P.: lZ N H 1 I 8i Q U U ' ti- 1 1 1 • 1 m N O $ 1mMO cm rc z Z I g O N H N b i'I a t >>p y 2 e 0.N I m Oil _ Y h w 1 cmn N Y C! I O: ® 11 1 C co I : 1 1 1Iao111=,t, 1111 A F11 . i 11/30/10 Sckhaakerger NO. 5652 Alaska Data & Consulting Services Company: State of Alaska 2525 GambeII Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 8 Log Description Date BL Color CD Z -01B BD88 -00070 MEM PROD PROFILE 001 -/n' 10/31/10 1 Q� 1 , 04 -25 BJOH -00005 INJECTION PROFILE (2 U7' /�( G R(9 11!08 /10 1 ' r ,' 1 04-25 BJOH -00005 INJECTION PROFILE (5 ") ( 4 -TSZ4' 11/08/10 1 .. -�. 1 V -07 BAUJ -00052 MEM PROD PROFILE 11/12/10 1 '� n 1 06 -24A BCRD -00068 PRODUCTION PROFILE b^� 11/11/10 1 1,1 n 1 F -19A AWJI -00121 MEM PROD PROFILE a- j 11)09/10 1 t (f, 1 X -25 B1388-00068 MEMORY GLS / /-n� 10/30/10 1 ;'7h '` 1 P -08A BCUE -00090 MEMORY GLS I �— • _ 10122110 1 'A 4, 1 04 -30 B088-00063 MEM PROD PROFILE - - 6`js [$'Y 10 /26/10 1 < 1 01 -06A BCRD -00063 PRODUCTION PROFILE ,� 10)23/10 1 1 D • -33 BD88 -00061 MEM PROD PROFILE S(s 10/20/10 1 (74 1 Z -26A B1388-00067 MEM PROD PROFILE O(o (�1 10128110 1 1 Z -13A BD88.00062 MEM PROD PROFILE ) - . CC/ - gip S 10/22/10 1 ..r,9 4 1 01 -02 I BCRD -00066 INJ PROFILEIWFL / �l g 10125110 'i 1 '5 ( 1 V -219 AZ2F -00069 MEM INJECTION PROFILE V} e e4 a 10/31/10 1 r /'i 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 • 900 E. Benson Blvd. Anchorage, AK 99503 -2838 SuitliNW MAR 3. 4 21111 • C\- ):('---- 4, '''''' H} ;r'rt:^ gg "., r�' r.. ' ��11 , L O gM p iltypf DATA SUBMITTAL COMPLIANCE REPORT 3/31/2010 Permit to Drill 2081730 Well Name/No. PRUDHOE BAY UNIT F-19A Operator BP EXPLORATION (ALASKIy INC API No. 50-029-20629-01-00 MD 13980 TVD 8688 Completion Date 2/17/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION ~- Mud Log No Samples No Directional Surv Ye DATAINFORMATgN Types Electric or Other Logs Run: DIR / GR /RES / PWD, USIT, DIR / GR /RES / NEU /DEN (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / i y e mea~rrmi nwnu~r Name al4GIC ~nCwa no afar[ atop ~.n rtecewra a.unun~nw D ~, C Asc Directional Survey 0 11325 Open 12/24/2008 Djcectional Survey 0 11325 Open 12/24/2008 D C Lis rH§48 Induction/Resistivity 7877 13985 Open 5/4/2009 LIS Veri, GR, ROP, FET, (~ <1 ~ (~ RPX. RPS, RPM, RPD, RAM, DRHO, NPHI, TRPM Induction/Resistivity 25 Blu 7875 13933 Open 5/4/2008 MD Vision Service og Induction/Resistivity 25 Blu 7875 13933 Open 5!4/2008 TVD Vision Service D D Asc Directional Survey 0 13980 Open 2/25/2009 pt Directional Survey 0 13980 Open 2/25/2009 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y® Daily History Received? 1~' N Chips Received? ~~ Formation Tops ~ N Analysis Y-HQ" Received? II DATA SUBMITTAL COMPLIANCE REPORT 3131 /2010 Permit to Drill 2081730 Well Name/No. PRUDHOE BAY UNIT F-19A Operator BP EXPLORATION (ALASKIy INC MD 13980 TVD 8688 Completion Date 2/17/2009 Completion Status 1-OIL Current Status 1-OIL Comments: Compliance Reviewed By: UIC N Date: API No. 50-029-20629-01-00 (~ L__J oai2~ios SChhllllb~l'~~~' NO. Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken A7TN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wa_II .Inh $ 1 nn rlncn .din.. n..~.. n~ n_~_.. nn F-45A AP3O-00033 RST GRAVEL PACK LOG 04/17/09 1 1 P2-07 AVYO-00023 PRODUCTION PROFILE ^ 04/05/09 1 1 11-12 AYOO-00019 USIT L - S ~ 04/19/09 1 1 X-OS AYTO-00010 USIT Qj~ 04/03/09 1 1 X-01 AZ4D-00012 PRODUCTION PROFILE - ~ 03/18/09 1 1 2-21A AP3O-00022 RST ~" 02/24/09 1 1 E-34L1 AYTU-00010 OH LDWG EDIT (IFLEX) 02/08/09 1 1 L-106 22026 OH LDWG EDIT (REDO) 01/10/02 1 MPF-96 09AKA0039 OH MWD/LWD EDIT ~ 02/23/09 2 1 F-19A 40018664 OH MWD/LWD EDIT - 02/14/09 2 1 F-18A 09AKA0034 OH MWD/LWD EDIT 03/16/09 2 1 06-23C 12066550 MCNL ~ 09/14/08 1 1 03-14B BIJJ-00005 MCNL - 03/30/09 1 1 11-18 BOCV-00006 RST --l/ 1 03/02/09 1 1 07-206 AWJB-00028 MCNL ~ 02/27/09 1 1 MPB-22A AXBD-00005 CH EDIT PDC-GR (CBL) I 12/23/08 1 07-29D AXBD-00016 MCNL ~ ,(> 03/17/09 1 1 09-33A AWJI-00019 MCNL - 04/01/09 1 1 r~oraa~ w~.nrvvvv~cuut nc~.clrl aT .71UrvIrvU NrvU rltl VrIrvI1VU Vrvt I:VYT tAG1Y IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Wednesday, April 29, 2009 1:30 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU F-19A / PTD # 208-173 Hi Art, Please reference the following well: Well Name: PBU F-19A Permit #: 208-173 API #: 50-029-20629-01-00 Top Perf MD: 11839' Bottom Perf MD: 13935' This well began Production on April 20, 2009 Method of Operations is: Flowing Date of Test: 04/24/09 Hours Tested: 4 24-Hour Rate /Oil-Bbl: 338 24-Hour Rate /Gas-Mcf: 20,439 24-Hour Rate /Water-Bbl: 4 Test Rate /Oil-Bbl: 56 Test Rate /Gas-Mcf: 3,407 Test Rate /Water-Bbl: .7 Choke Size: 65 Gas-Oil Ration: 60,449 Flow Tubing Pressure: 1,700 Casing Pressure: 1,240 Oil Gravity-API: Not Available 4/29/2009 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~F1~'~ ~~i~;a°~ .~ ~ ~D09 WELL COMPLETION OR RECOMPLETION REPORT AND LOG:~t~asli~ ~j~ ~~~ ~on~. CSSiW~ I AnC9loraru, 1a. Welt Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Com letions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Strati ra hic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 2/17/2009 12. Permit to Drill Number 208-173 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 2/3/2009 ~ 13. API Number 50-029-20629-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 2/14/2009 ' 14. Well Name and Number: PBU F-19A FNL, 2192 FEL, SEC. 02, T11N, R13E, UM 2845 Top of Productive Horizon: 2787' FSL, 3203' FEL, SEC. 35, T12N, R13E, UM 8. KB (ft above MSL): 64.93' Ground (ft MSL): 36.22' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 2670' FSL, 55' FEL, SEC. 34, T12N, R13E, UM 9. Plug Back Depth (MD+TVD) 13980' 8688' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 652649 y- 5973969 Zone- ASP4 10. Total Depth (MD+TVD) 13980' - 8688' 16. Property Designation: ADL 028280, 028277, 028278 TPI: x- 651518 y- 5979579 Zone- ASP4 th: x- 649389 - 5979419 Zone- ASP4 Total De 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: p y 18. Directional Survey ®Yes ^ No mi r ni ri inf i n 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (l1/D): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIR / GR /RES / PWD, USIT, DIR / GR /RES / NEU /DEN h~NDdI'YG~ ~o?/'f'~MD ~~697YD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT , WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED I 1 1 ' " # L- rf 1 -1 4" 17 I 1 7" L- 1 1 -1 553 cu ft LiteCrete 180 cu ft'G' 883 cu ft'G' 23. Open to production or inject ion? ®Yes ^ No 24. T uswG RECORD If Yes, IISt each I (MD+TVD of To & Bottom Pe ntefVal Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET m ; p 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 11646' 11528' MD TVD MD TVD 11839' - 13935' 8656' - 8687 2~j, ACID, FRACTURE, CiEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 2207' Freeze Protect w/ 152 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PfeSS. CBSIng PfeSS: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Ac uired? ^Yes ®No Sidewal l Core s A uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None ~ MAE~ ~ 2009 ~ :; ~t`_~' ~.: .,..~,.. FDfm 10-407 ReVISed 02/2007 CONTINUED ON REVERSE .SIDE 7j/~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND KERS ENCOUNTERED): 29. FORAAATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 11820' 8644' None Shublik 11931' 8690' Base Sag River (Invert) 11965' 8693' Base Sag River (Revert) /Top 13860' 8686' Shublik Formation at Total Depth (Name): Shublik 13860' 8686' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the forego' g is true and correct to the best of my knowledge. y~ (J ~ ` ~ ~~ Signed Terrie Hubble Title Drilling Technologist Date PBU F-19A 208-173 Prepared By NameMumber. Terrie Hubble, 564-4628 Well Number P r i I Drilling Engineer: Mark Steudinger, 5645733 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEYI 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: F-19 Common Name: F-19 Test Date Test Type Test uepth (TMU) i est ueptn (i vu~ Hmvv ~ aunace rressure ~CaK vu rigsa~~ C ~or,c~ ~w~.. _ _ _ _ _ - 2/2/2009 LOT 8,251.0 (ft) 5,429.0 (ft) 9.20 (ppg) 395 (psi) 2,990 (psi) 10.60 (ppg) 2/11/2009 FIT 11,812.0 (ft) 8,640.0 (ft) 8.40 (ppg) 820 (psi) 4,590 (psi) 10.23 (ppg) Printed: 3/6/2009 1:45:38 PM ~ + BP EXPLORATION Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Event Name: REENTER+COMPLETE Start: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase 1 /29/2009 Page 1 of 14 Spud Date: 9/5/1981 End: 2/17/2009 Description of Operations 1/29/2009 06:00 - 08:00 2.00 MOB P PRE PJSM with Peak. Move pits from sub. PJSM with rig personnel prior to change drilling line spool. Continue preparing rig for move. 08:00 - 12:00 4.00 RIGU P PRE PJSM. Transport and spot sub and pits on well F-19A. Hook up service lines from rig to pits. 12:00 - 13:00 1.00 RIGU P PRE RU circulate lines in cellar, thaw frozen lines in pits. Weld new drilling line to existing drilling line. 13:00 - 16:00 3.00 WHSUR P DECOMP Rig Accepted at 1300 hrs Test OA to 2000 psi for 30 minutes: good test. Lost 50 psi during first 15 min and 10 psi during last 15 min. 16:00 - 17:00 1.00 WHSUR P DECOMP RU DSM lubricator and pull BPV. 17:00 - 21:30 4.50 WHSUR P DECOMP Reverse circulate diesel freeze protect out of tubing: 94 bbls at 3 bpm with 210 psi. RU and circulate diesel freeze protect from IA: 198 bbls at 3 bpm with 1200 psi. 21:30 - 00:00 2.50 WHSUR P DECOMP PJSM. Install and test TWC. RU test lines. Attem t to test from below as follows: -Pump 21 bbls at 0.8 bpm with 45 psi. -Pump 18 bbls at 3 bpm with 300 psi. -Unable to reach 1000 psi test from below due to existing 1/30/2009 00:00 - 01:00 1.00 WHSUR P 01:00 - 02:00 1.00 WHSUR P 02:00 - 04:30 2.50 BOPSU P 04:30 - 10:30 6.00 BOPSU P 10:30 - 11:30 1.00 BOPSU P 11:30 - 13:00 1.50 WHSUR P 13:00 - 13:30 0.50 PULL P 13:30 - 00:00 10.501 PULL ~ P -i cap iiuni auuvc w u , psi during first 5 min and 15 psi during last 5 min. -RD and blow down test lines. -Total of 115 bbls of 9.8 ppg brine was lost to the formation while circulating out the diesel freeze protect and testing TWC. DECOMP Continue to blow down test lines. Pick up and clean up tools. DECOMP ND tree and adapter flange. Disconnect SSSV control lines. Inspect hanger threads. Took 10 1/4 turns by hand to thread in crossover for pulling hanger. DECOMP RU to test BOP DECOMP With TWC valve installed ion hanger test BOP equipment with 4" and 5" test joints to 250 psi / 3500 psi. Each test held for 5 minutes. Lou Grimaldi of AOGCC waived witness of test. - Upper pipe rams dressed with 2 7/8" x 5" variables tested to 250/3500 psi with 4" and 5" test joints. Each test held for 5 minutes. Annular preventer tested to 250/3500 psi with 4" test joint. -Test witnessed by Toolpusher Lenward Toussant and Biff Perry, WSLs Mike Dinger and Josh Morales. -All tests passed. DECOMP RD, blow down test equipment DECOMP RU DSM lubricator and extension, ull TWC. RD lubricator; DECOMP Engage tubing hanger, unseat at 82k (excluding weight of TD). Pull tubing hanger. Monitor well for flow - 24 bbls of fluid was lost to formation. -Started to reduce brine weight by mixing in 9.5 ppg brine to help reduce fluid losses. -MW in 9.5 ppg / MW out 9.8 ppg. DECOMP PJSM. Pull and LD 4 1/2" 12.6# L-80 NSCT tubing from pre-rig cut at 9250' MD to 1050' MD. -Tubing broke out easily -Lost 166 bbls of fluid while pulling out of hole. Fluid losses rnmeo::sroi~uua i:vo:nv rnn BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code ~~ NPT Phase Description of Operations 1/30/2009 13:30 - 00:00 10.50 PULL P DECOMP tapered down from 35 bph to 6.6 bph. Continue to pump in 9.5 ppg brine. -MW in 9.5 ppg / MW out 9.5 ppg. 1/31/2009 00:00 - 00:30 0.50 PULL P DECOMP PJSM. Continue to pull and LD 4 1/2" 12.6# L-80 NSCT tubing from 1050' MD to surface. -Pulled 219 full joints + cut joint (21.18'), 3 GLM, and SSSV (with bare 1/4" stainless steel control lines) -Recovered 55 stainless steel bands (well history showed 55 in hole) -6 bph fluid loss rate. 00:30 - 01:30 1.00 PULL P DECOMP RD completion pulling equipment. Clean up and clear rig floor. 01:30 - 03:30 2.00 MOB N RREP DECOMP Shim the rig on off driller's side for better alignment between the flowline and the BOP stack. 03:30 - 05:00 1.50 BOPSU P DECOMP RU test equipment to test lower pipe.. rams. Install test plug and test lower 3 1/2"x6" varia a rams with 4" and 5" test joint to 250 psi low and 3500 psi high. Each test held for 5 minutes. Good test. Pull test plug and R/D test equipment. Install wear ring. 05:00 - 08:30 3.50 CLEAN P DECOMP Make up BHA#1 9 5/8" clean out assembl :Used 8 1/2" bit, 9 5/8" casing scraper, 9 DC, jars, 23 4" HWDP. Run in the hole to 1009' MD. 08:30 - 10:00 1.50 CLEAN P DECOMP RIH on 4" drill pipe from 1009' to 5782' -Fill pipe every 30 stands 10:00 - 13:30 3.50 CASE P DECOMP RIH on 4" drill pipe singles from 5782' to 8555' -PUW 140k, SOW 105k 13:30 - 14:30 1.00 CLEAN P DECOMP Circulate bottoms up at 492 gpm with 688 psi. -MW in 9.5 ppg / MW out 9.5 ppg -32.7 bbls of fluid lost during CBU. 14:30 - 18:30 4.00 CLEAN P DECOMP POH with 9 5/8" casin clean out assembl from 8555' to 1009'. -5 bbls of fluid lost during trip out of hole. 18:30 - 20:00 1.50 CLEAN P DECOMP LD 9 5/8" casing clean out assembly. Stand back HWDP and lay down bit. 20:00 - 21:30 1.50 EVAL P DECOMP Change saver sub on top drive from HT 40 to 4 1/2" IF. 21:30 - 22:30 1.00 EVAL P DECOMP MU BHA#2 with 9 5/8" RTTS 9 5/8" circ valve, 9 6 1/2" DC, XO sub, 21 jts HWDP. 22:30 - 00:00 1.50 EVAL P DECOMP RIH with 9 5/8" RTTS BHA from 929' MD to 3794' MD. -Total losses to formation while RIH 22.3 bbls. 2/1/2009 00:00 - 04:00 4.00 EVAL P DECOMP Continue to RIH with RTTS from 3794' MD to 7261' MD. 04:00 - 05:00 1.00 EVAL P DECOMP Set RTTS at 7261' and pressure test cement below the RTTS to 2300 si for 10 minutes and chart - ood test. Attempt to test from above. Failed test, pressure broke over at 490 si at 1.7 b m. 05:00 - 06:30 1.50 EVAL P DECOMP Continue RIH on 5" drill pipe singles to 8624' MD. 06:30 - 07:30 1.00 EVAL P DECOMP POOH from 8624' MD to 6735' MD. 07:30 - 08:30 1.00 EVAL P DECOMP Set RTTS at 6728' MD and pressre test 9 5/8" casin from a ove t e o 00 si or 30 minutes - ood test lost 70 psi during first 15 minutes and 20 psi during last 15 minutes. Release RTTS, RD blow lines. 08:30 - 10:30 2.00 EVAL P DECOMP POOH from 6728' MD to 930' MD. 10:30 - 12:00 1.50 EVAL P DECOMP LD BHA#2 with RTTS. Rack back 7 stands of HWDP and 3 stands of DC. -Fluid loss rate for the last 12 hrs: 3.5 b h. Printetl: 3/6/2009 1:45:44 PM BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTE R+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations _ _ _ __ - - 2/1/2009 12:00 - 14:00 2.00 EVAL P DECOMP PJSM. Rig up Schlumberger E-line unit. 14:00 - 22:00 8.00 EVAL P DECOMP Pick u USIT / CCL / GR. RIH to 8500' MD. L 8500' MD to surface. 22:00 - 23:30 1.50 DHB P DECOMP RU to run 9 5/8" Halliburton EZSV plug on E-line. 23:30 - 00:00 0.50 DHB P DECOMP RIH with Halliburton 9 5/8" EZSV plug on E-line to 7300' MD. -Fluid loss rate for the last 12 hrs: 2.7 bph. 2/2/2009 00:00 - 01:30 1.50 DHB DECOMP Continued RIH with 9 5/8" Halliburton EZSV plug on E-line to 8233' MD. Set EZSV at 8233' MD (top element), 6' above casin collar at 8239' MD. Positive indication at surface of set. Tension in E-line lost 250 lbs. PU and SO on EZSV 400 Ibs to confirm set. 01:30 - 03:00 1.50 DHB DECOMP POOH and RD Schlumberger E-line. Verified tension sleeve in EZSV setting tool sheared. 03:00 - 05:30 2.50 STWHIP WEXIT Make u 9 5/8" whi stock BHA #3 with 8 5/16" Bottom Trip Anchor, Baker Gen II 9 5/8" whipstock, 8 1/2" window mill, 8 5/16" lowerwatermellon mill, flex joint, 8 1/2" upper watermellon mill, MWD, HWDP. 05:30 - 06:30 1.00 STWHIP WEXIT RIH with whipstock BHA on 4" DP to 1505' MD and shallow test MWD tools: 790 psi, 450 gpm. 06:30 - 11:00 4.50 STWHIP WEXIT Continue RIH from 1505" to 8191' MD. 11:00 - 11:30 0.50 STWHIP WEXIT O 'ent and set Baker Gen II 9 5/8" whi stock 29 degrees left of high side at 8235' MD with 20k set down weight. PU 10k over to confirm. Shear mills from slide with 42k down weight. Pick up to confirm mills sheared from the whipstock assembly. 11:30 - 13:00 1.50 STWHIP WEXIT Displace well to 9.2 p LSND millin fluid. 13:00 - 21:30 8.50 STWHIP WEXIT Mill 8 1/2" window in 9 5/8" casing. -Top of window at 8214' MD . -Bottom of window at 8231'MD Drill new hole to 8251'; no indication of cement behind casing. ~_~ ~ -504 gpm, 894 psi -PUW 100k, SOW 100k, ROT Wt 96k -85 rpm, 2k fUlbs torque, 6k weight on mill Pump 25bbls of LCM at the each the top and bottom of the window to address losses from the leak in the 9 5/8" casing.40 ppb sweep contained SafeCarb250, NutPlugF, MISEAL, GSeal and Mixll-M 21:30 - 22:30 1.00 STWHIP WEXIT Circulate bottoms up with a 25 bbls Supersweep to clean metal debris from wellbore. Total of 340 Ibs of metal shavings retrieved across shaker ma n Work mills through the window several times with and without pumps. No hang-ups. 22:30 - 23:00 0.50 STWHIP WEXIT Perform slow pump rates and rig up for FIT. 23:00 - 00:00 1.00 STWHIP WEXIT Pull BHA into casing and attempt FIT to EMW of 12.2 ppg. Achieved a surface pressure of 395 psi without indication of rea own o ea o of 10 6 ppq with 9 2 ooa mud in the hole at a depth of 5429' TVD while pumping into the retaceous eak in the 9-5/8" ca in .Discuss with town and determine EMW is suitable to drill ahead. 2/3/2009 00:00 - 00:30 0.50 STWHIP P WEXIT Rig down FIT equipment and slip and cut 146' of drilling line. 00:30 - 04:00 3.50 STWHIP P WEXIT POH from 8166' to 217'. 04:00 - 05:30 1.50 STWHIP P WEXIT La down millin BHA #3. Window mill measured under gauge at 8 5/16", lower string mill in gauge at 8 5/16", upper string mill in gauge at 8 1/2". Printed: 3/6/2009 1:45:44 PM n BP EXPLORATION Page 4 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date !, From - To Hours I Task Code NPT Phase Description of Operations 2/3/2009 05:30 - 07:00 1.50 STWHIP P WEXIT Pull wear bushing and jet BOP stack. 07:00 - 08:00 1.00 STWHIP P WEXIT Clean and service rig. 08:00 - 09:30 1.50 STWHIP P WEXIT PJSM. Make up 8 1/2" drilling BHA #4 - DTX619M-D6 8 1/2" bit, 1.5 degree motor, ARC6, MWD, NM Stab, 2 NM Spiral DCs, NM Stab, 1 NM Spiral DC, Float, Jars, HWDP. Shallow test at 1098' MD -good at 502 GPM with 940 psi. 09:30 - 13:00 3.50 STWHIP P WEXIT Continue RIH from 1098' to 8251' MD picking up 46 stands 4" drillpipe and 42 stands of 5" drillpipe Pass the BHA through the window with no rotation or circulation without any problems. - 99k SOW Circulate to establish clean hole ECD baseline of 9.75 ppg 13:00 - 00:00 11.00 DRILL P INT1 Drill ahead in 8 1/2" hole from 8251' to 9209' MD - 550 gpm, 2770 psi on, 2529 psi off - 10k WOB, 10.4k ft/Ibs torque on, 7.7k ft/Ibs torque off, 80 rpm - 165k PUW, 115k SOW, 135k ROT Wt - 9.80 ppg talc ECDs, 10.27 ppg actual ECDs -AST 4.85 hrs, ART 2.12 hrs, ADT 6.97 hrs, Bit 6.97 hrs, Jars 6.97 hrs - Addinrr 20 bhls of H2O oer hour and 5 sacks oer hour of LCM - Fluid loss rate: 2 boh - Mud Weight in/out - 9.2 ppg 2/4/2009 00:00 - 12:00 12.00 DRILL P INT1 Drill ahead in 8 1/2" hole from 9209' to 9844' MD - 500 gpm, 3080 psi on, 2945 psi off - 10k WOB, 10k ft/Ibs torque on, 8.5k ft/Ibs torque off, 80 rpm - 182k PUW, 127k SOW, 145k ROT Wt - 11.4 ppg talc ECDs, 11.73 ppg actual ECDs -AST 3.72 hrs, ART 3.33 hrs, ADT 7.05 hrs, Bit 14.05 hrs, Jars 14.05 hrs -Adding 10 bbls of H2O per hour - Started to slowly add spike fluid at 9450' MD to reach MW to 10.8 PPg• - 16.5 bbls fluid loss while while drilling ahead - Slow pump rates recorded at 9780' MD. 12:00 - 00:00 12.00 DRILL P INT1 Drill ahead in 8 1/2" hole from 9844' to 10676' MD - 500 gpm, 3503 psi on, 3249 psi off - 15k WOB, 10k fUlbs torque on, 8k fUlbs torque off, 80 rpm - 190k PUW, 140k SOW, 155k ROT Wt - 11.42 ppg talc ECDs, 11.89 ppg actual ECDs - AST 3.5 hrs, ART 5.12 hrs, ADT 8.62 hrs, Bit 22.68 hrs, Jars 22.68 hrs -Adding 10 - 20 bbls of H2O per hour - No fluid loss noted while drilling ahead - Slow pump rates recorded at 10530' MD. 2/5/2009 00:00 - 12:00 12.00 DRILL P INT1 Drill ahead in 8 1/2" hole from 10676' to 11473' MD - 500 gpm, 3650 psi on, 3435 psi off - 15k - 20k WOB, 12k ft/Ibs torque on, 12.5k ft/Ibs torque off, 100 rpm - 214k PUW, 150k SOW, 169k ROT Wt - 11.41 ppg talc ECDs, 11.94 ppg actual ECDs - AST 1.02 hrs, ART 7.85 hrs, ADT 8.87 hrs, Bit 31.55 hrs, Jars 88.7 hrs Printed: :i/li/LUU'J 1:45:44 YM • • BP EXPLORATION Page 5 of 14 Operations Summary Report Legal Well Name: F -19 Common W ell Name: F -19 Spud Date: 9/5/1981 Event Name : R EENTE R+COM PLET E Start : 1/29/2009 End: 2/17/2009 Contractor Name: N ABOBS ALASK A DRI LLING I Rig R elease: Rig Name: N ABOBS 7ES Rig N umber: Date From - To Hours Task Code NPT Phase Description of Operations 2/5/2009 00:00 - 12:00 12.00 DRILL P INT1 -Adding 20 - 50 bbls of H2O per hour - No fluid loss noted while drilling ahead -Slow pump rates recorded at 11285' MD 12:00 - 19:30 7.50 DRILL P INTi Drill ahead in 8 1/2" hole from 11473' to 11814' MD - 500 gpm, 3750 psi on, 3521 psi off - 15k - 20k WOB, 11.5k fUlbs torque on, 11 k ft/Ibs torque off, 100 rpm - 224k PUW, 155k SOW, 170k ROT Wt - 11.34 ppg calc ECDs, 11.72 ppg actual ECDs -AST 0.75 hrs, ART 4.5 hrs, ADT 5.25 hrs, Bit 36.8 hrs, Jars 93.95 hrs - Adding 25 - 50 bbls of H2O per hour - No fluid loss noted while drilling ahead - Slow pump rates recorded at 11814' MD. 19:30 - 21:00 1.50 DRILL P INTi Circulate bottoms u for eolo ical evaluation. Geolo ist confirmed casin oint after verif in Sa River sand sam les with gluconite. Continue to circulate bottoms up while reciprocating and rotating to ensure cuttings removal for a total of 2 BU. Pump High Vis Sweep. Cuttings coming accros the shakers showed 80-90% of shales less than a 1/4" in long, 5-10% of sand and no indications of wellbore instability. Actual ECDs within 0.24 ppg over calculated ECDs. - 500 gpm, 3350 psi, 100 rpm - PUW 224k, SOW 155k, 11.5k Wlbs torque on - No losses noted during circulation - Monitor well -static 21:00 - 00:00 3.00 DRILL P INTi POOH from 11814' MD to 9290' MD with no issues. - No overpulls over 20k encountered. - Monitor well -static - MW in 10.8 ppg / MW out 10.8 ppg. 2/6/2009 00:00 - 01:00 1.00 DRILL P INT1 Continue to POOH to the 9 5/8" window at 8160' MD with no issues. Clean and clear rig floor. 01:00 - 03:00 2.00 DRILL P INT1 PJSM on Cut and Slip drilling line - Cut 1570' of line - Change drilling line to new spool 03:00 - 05:00 2.00 DRILL P INTi RIH from 8214' MD to 11814' MD. - PUW 230k, SOW 145 - No recorded tight spot - Adding H2O at 50 bph - MW in /out 10.8 ppg 05:00 - 07:00 2.00 DRILL P INT1 Stage up pumps and circulate 30 bbl Hi Vis sweep surface to surface while reciprocating and rotating the pipe - 500 gpm, 3725 psi - 100 rpm, 12k ft-Ibs torque - PUW 230k, SOW 145k, - MW in /out 10.8 ppg - 70% increase in cuttin s comin across shakers when the Hi-Vis swee came to surface. - Monitor well - no losses noted - Calc ECD 11.27 ppg, Act ECD 11.51 ppg 07:00 - 09:30 2.50 DRILL P INT1 POOH from 11814' MD to 8356' MD with no problems. - Pump dry job at 10900' MD. - Monitor well -static rnmeo: °roi~wa rw°:vv rm • • BP EXPLORATION Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Event Name: REENTER+COMPLETE Start: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From.- To Hours Task Code' NPT Phase 1 /29/2009 Page 6 of 14 ~ Spud Date: 9/5/1981 End: 2/17/2009 Description of Operations. 2/6/2009 09:30 - 10:30 1.00 DRILL P INT1 MAD Pass to tie into mother wellbore from 8536' MD to 7914' 10:30 - 14:00 I 3.501 DRILL I P 14:00 - 15:30 1.501 DRILL P 15:30 - 17:30 I 2.001 BOPSUR P 17:30 - 18:30 1.00 CASE P 18:30 - 00:00 5.50 CASE P 12/7/2009 100:00 - 02:00 I 2.001 CASE I P 02:00 - 04:30 I 2.501 CASE I P 04:30 - 06:00 1.50 ~ CASE P 06:00 - 08:30 I 2.501 CASE I P 08:30 - 11:00 I 2.501 CEMT I P 11:00 - 13:30 ~ 2.50 ~ CEMT ~ P MD. - MAD Pass at 600 fph - No pumping or rotation across window. INTi Continue to POOH from 7914' MD to 280' MD. - No fluid loss noted - MW in /out 10:8 ppg INT1 PJSM. Lay down 8 1/2" drilling BHA #4. Inspect bit; grade 1-2-WT-G-X-1-PN-TD -Clear and clean rig floor of all 8 1/2" BHA and handling equipment. LNR1 Chan a out u er ram to 7". Test u er rams with 7" test 'oint . n test lu to 250 si low and 3500 si hi h. Record on chart. Good test. Install wear ring. LNRi PJSM on running 7" liner. RU to run 7" liner. LNR1 Make up 7" and Baker-lok shoe track, check floats. Run 7", 26#, L-80, BTC-M liner to 3711' MD. - Average MU torque on 7" BTC-M liner is 7.8k ft-Ibs. - Make up Baker 'HMC' liner hanger / ZPXN liner top packer and "HRD' running tool. - PUW 102k, SOW 80k - No fluid losses noted while RIH. LNRi Continue to RIH with 7" 26# L-80 BTC-M liner from 3711' MD to 3740' MD. Circulate 1.5 liner volumes (210 bbls) at 5 bpm with 280 psi. LNR1 Continue to RIH with 7", 26#, L-80, BTC-M liner from 3740' MD to 8160' MD on 4" DP filling pipe every 10 stands. -No losses noted while RIH. LNR1 Break circulation prior to entering the open hole. -Stage up pumps while monitoring for losses: 1 bpm C~3 355 psi, 2 bpm ~ 445 psi, 3 bpm ~ 530 psi, 4 bpm ~ 630 psi, 5 bpm ~ 780 psi. - Circulate 277 bbls at 9 5/8" casing window (1.5 annular volumes . LNR1 Continue to RIH with 7", 26#, L-80, BTC-M liner from 8160' MD to TD at 11814' MD. - Set 10k Ibs down to verify TD at 11814' MD with 100 psi increase. - No losses noted while RIH. LNR1 PJSM with SLB, crew, WSL, Toolpusher. MU cement head. Circulate one bottoms up. Stage up pumps: 1 bpm C~1 440 psi, 2 bpm C~ 515 psi, 3 bpm ~ 600 psi, 4 bpm ~ 840 psi and 5 bpm C~ 1100 psi for a total of 565 bbls. - Reci rocated i e during circulation - -PUW 265k, SOW 125k - No losses noted during circulation LNR1 Cement liner per cement plan. -Pump 10 bbls of MudPUSH II ~ 12 ppg - Pressure test cement lines to 4,500 psi with MudPUSH II. -Pump 20 bbls of MudPUSH II ~ 12 ppg - Pump 98 bbls of 12.0 ppg LiteCRETE lead cement - Pump 35 bbls of 15.8 ppg Class G tail cement - Switch to rig pumps; drop wiper dart, positive indication dart Printetl: :3/62009 1:45:44 PM BP EXPLORATION Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Event Name: REENTER+COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 7ES Date From - To Hours ' Task Code NPT 2/7/2009 11:00 - 13:30 ~ 2.50 CEMT P 13:30 - 15:30 I 2.001 CEMT I P 15:30 - 20:00 4.50 CEMT P 20:00 - 22:00 2.00 CASE N 22:00 - 00:00 2.00 CASE N 2/8/2009 00:00 - 01:00 1.00 CASE N 01:00 - 02:30 02:30 - 05:00 05:00 - 06:00 06:00 - 07:00 07:00 - 13:00 1.501 CASE I N 2.50 CASE N 1.00 CASE N 1.00 CASE P 6.00 CASE P Start: 1 /29/2009 Rig Release: Rig Number: Phase LNR1 LNR1 LNR1 CEMT ITIEBI CEMT TIE61 CEMT TIE61 CEMT ITIEB CEMT TIEB1 CEMT TIEB1 TIE61 TIEBi Page 7 of 14 Spud Date: 9/5/1981 End: 2/17/2009 Description of Operations left cement head. - Displace dart with 220.6 bbls of 10.8 ppg LSND mud. - 69 bbls to latch liner wiper plug at 4 bpm, 750 psi spike - Bump the plug at 3 bpm, bumped plug with 2000 psi, Pressure to 3000 psi to set HMC liner hanger. - Set down 75k to confirm liner hanger set. - Bleed pressure to zero and check floats - Monitor well at floor for flow -Static - Pressure up to 4100 psi to release from HRD liner running tool. - Pick up 5' to expose dogs on HRD liner running tool, set down 50k to set ZXPN liner top packer, surface indication of packer set - Slack off, rotate 15 rpm to confirm set - Pressure up to 1000 psi, unsling liner running tool from PBR and circulate out excess cement. - Pumps 430 gpm, 1855 psi to clear cement in well above packer - Returns show 7 bbls cement to surface - Blow down lines and break down cement head POH from liner top at 8078' to surface. - Pump dry job - Cement found in the bottom 1500' of 4" DP which indicated the need for dedicated clean-out run. - LD liner hanger running tool BHA - Inspect and confirm dog sub pins sheared - MW in /out 10.8 ppg. MU polishing mill BHA #5 with: 7.42" PBR Polishing Mill, 8.11" PBR Top Dressing Mill, 9 5/8" Casing Scraper and Float Sub. RIH with polishing mill BHA #5 on 4" DP to 6584' MD. Continue to RIH with polishing mill BHA #5 from 6584' MD to 8018' MD. Sting into PBR and tag no go shoulder at 8078' MD with 5k SOW. - PUW 155k, SOW 98k, ROTW 118k - 167 gpm, 520 psi - 40 rpm, 7.5k ft-Ibs torque Polish PBR by rotating at 91 rpm with 8.7k ft-Ibs torque and circulating at 168 gpm with 524 psi. Increased pump rate to 11 bpm. - Pump 30 bbl Hi Vis Sweep at 500 gpm with 2190 psi for a total of 587 bbls. - Contaminated fluid coming across shakers (pH = 12.3). Dump and dilute fluid in order to control pH. - Rheological properties returned to optimal after Hi Vis Sweep came to surface: pH = 9.1 and MW out = 10.2 ppg. POOH with polishing mill BHA #5 from 8078' MD to 6775' MD. Pump dry job. Continue to POOH to 600' MD. Lay down polishing mill BHA #5. Rack back 7 stands HWDP. Clean and clear rig floor. RU to run 7", 26#, L-80, BTC-M scab liner. PJSM with crew, WSL and Toolpusher. Run 91 jts 7" scab liner with centralizers on each joint. Make up shoe track and baker lock, check floats. rnrnea: aioizuua i:vo:aw rm ~ ~ BP EXPLORATION Page 8 of 14 ~ Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: i Date From - To ~ Hours. Task ~ Code NPT Phase 2/8/2009 07:00 - 13:00 6.00 CASE P TIEB1 13:00 - 14:00 1.00 CASE P TIEB1 14:00 - 17:30 ~ 3.50 ~ CASE ~ P ~ ~ TIEB1 17:30 - 19:30 2.001 CEMT P TIE61 19:30 - 22:00 I 2.501 CEMT I P I ITIEBI 22:00 - 22:30 I 0.501 CEMT I P I I TIE81 22:30 - 23:30 1.001 CEMT P TIEBi 23:30 - 00:00 ~ 0.50 ~ CEMT P ~ TIEB1 12/9/2009 00:00 - 01:30 1.50 CEMT P TIEB1 01:30 - 02:30 1.00 CEMT P TIEB1 02:30 - 03:30 1.001 BOPSUFj P ~ ~ TIE61 03:30 - 04:30 1.00 BOPSU P TIEB1 04:30 - 10:00 5.50 BOPSU P TIEBi Description of Operations - PUW 110k, SOW 100k. Pick up Baker HMC liner hanger and ZXPN liner top packer on HRD liner running tool. Make up one stand of DP and circulate 220 bbls (1.5 liner volumes) at 210 gpm with 280 psi. Continue to RIH with 7" scab liner on 4" DP from 3864' MD and tao 7" liner top at 8078' MD with No Go with 5k SOW. Pressure up to 500 psi, PU to expose cementing ports, pressure bled off - positive indication of upper seals above PBR. - PUW 194k, SOW 105k MU cement head. Circulate one bottoms up. Stage up pumps: 1 bpm ~ 158 psi, 3 bpm @ 380 psi and 5 bpm ~ 745 psi for a total of 623 bbls. PJSM with Toolpusher, WSL, crews and SLB while circulating. - Did not reciprocate pipe during circulation - PUW 265k, SOW 125k - No losses noted during circulation Cement liner per cement plan. - Pump 5 bbls of 12.0 ppg MudPUSH II. - Pressure test cement lines to 4,500 psi with MudPUSH II. - Pump 20 bbls of 12.0 ppg MudPUSH II. - Pump 159 bbls of 15.8 ppg Class G cement - Switch to rig pumps; drop wiper dart, positive indication dart left cement head. - Displace cement with 179 bbls of 10.2 ppg LSND mud at 5 bpm. - 35 bbls to latch liner wiper plug at 3 bpm, 1600 psi spike - Bump the plug at 2 bpm, bumped plug with 1850 psi - Full returns throughout the job. Rig down cementing hose and install 1502 bull plug on the cementing head. Bleed pressure to zero and check floats. Pressure up to 2500 psi to set liner hanger. Set down 75k to confirm liner hanger set. Pressure up to 3950 to release from HRD liner running tool. Pick up 9' to ensure running tool is released and then slack off 75k to set ZXPN packer. Confirm packer was set by repeting packer setting sequence with rotation three times at 25 rpm. Pressure up to 1000 psi and pick up. Pressure loss was observed after liner running tool was pulled out of extension. Circulate at 430 gpm with 1415 psi; 50 bbls excess cement was returned strung out in 196 bbls of contaminated mud (pH 12.3) Pump dry job. POH with from liner top at 4317' to 629' MD. -MW in /out 10.2 ppg. LD 21 jts HWDP, LD HRD liner running tool. Inspect and confirm dog sub pins sheared Clean and clear floor Pull wear ring. Install test plug. PJSM with rig personnel. Chan a rams to 3.5" x 6" variables. RU to test BOP. Test BOP equipment with 4" and 5" test joints to 250 psi / 3500 psi. Each test held for 5 minutes. John Crisp of AOGCC waived witness of test. rrintea::~ioieuua i:u5:v4 rm BP EXPLORATION Page 9 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date ,From - To Hours Task Code NPT Phase Description of Operations - - __ 2/9/2009 104:30 - 10:00 5.50 BOPSU P (ITIEBI -Upper pipe rams dressed with 3.5" x 6" variables tested to 10:00 - 10:30 0.50 BOPSUF~ P TIE61 10:30 - 14:30 4.00 BOPSU~{N RREP TIEB1 14:30 - 15:00 0.50 CASE P TIEB1 15:00 - 16:00 1.00 CASE P TIEB1 16:00 - 21:00 5.00 CASE P TIEB1 21:00 - 22:00 1.00 CASE P ITIEBI 22:00 - 23:00 I 1.001 WHSUR I P I I TIE61 23:00 - 00:00 1.001 WHSUR P TIE61 12/10/2009 100:00 - 01:30 1.501 WHSUR P ITIEBI 01:30 - 03:30 2.00 WHSUR P TIEBi 03:30 - 07:00 3.50 DRILL P TIEB1 07:00 - 09:30 2.50 DRILL P TIEB1 09:30 - 10:30 1.00 EVAL P TIEB1 10:30 - 12:00 1.501 DRILL P ITIEBI 12:00 - 15:30 I 3.501 DRILL I P I I TIE61 250/3500 psi with 4" and 5" test joints. Each test held for 5 minutes. - Lower pipe rams dressed with 2 7/8" x 5" variables tested to 250/3500 psi with 4" and 5" test joints. Each test held for 5 minutes. Annular preventer tested to 250/3500 psi with 4" test joint. -Test witnessed by Toolpusher Larry Wurdeman, WSLs Duncan Ferguson and Josh Morales. -All tests passed. RD testing equipment. Manual (BOP failed. Remove and install rebuilt manual. Test manual (BOP and 4" TIW. Adjust back up wrench on Top Drive due to new (BOP. Pressure test 7" scab liner to 3500 psi for 10 minutes -good test. RD test lines. PU 6 1/8" cleanout BHA #6 with: 6 1/8" Hughes bit, Stablizer, DC and Hydraulic Jar on 4" DP and RIH to 130' MD. PU 25 stands of 4" DP 1x1 and RIH with 6 1/8" cleanout BHA #6 from 130' MD to 7865' MD. - PUW 150k, SOW 90k Circulate one bottoms up to clean up the hole at 450 gpm with 2615 psi for a total of 330 bbls. Cement contaminated mud returned to surface. RU and set storm packer at 37' MD with 90k Ibs of weight hanging below. Pressure test storm packer to 1000 psi for 10 minutes -good test. Pull wear ring. MU 9 5/8" x 13 3/8" packoff running tool and RIH. Back out lock down screws on starting head. Pull packoff through BOP stack with no issues. Install 9 5/8" x 13 3/8" pack-off in well head per FMC through BOP. Pressure test packoff to 5000 psi for 30 minutes -good test. Pull Halliburton 9 5/8" RTTS Storm packer and lay down. Install wear ring. RIH with 6 1/8" cleanout BHA on 4" DP to one stand above the 7" scab liner landing collar at 7995'. Drill landing collar, cement and float collar to 8,150' with 5" DP stands. Stand back two 5" DP stands, continue RIH with 4" DP. RIH to the drilling liner landing collar at 11670'. Wash down last stand at 300 gpm, 2000 psi. RU test equipment pressure test both 7" drilling liner, 7" scab liner and 9 5/8" casing to surface to 3500 psi for 30 minutes on chart. Good test. RD test equipment. Circulate to clean up hole. High torque. Large amounts of drilled cement coming over the shakers. Add tubes to decrease torque. -400 gpm, 2500 psi, 10.5k ft/Ibs torque at 15 rpm, PUW 235k, SOW 125k Drill cement plug, landing collar at 11,687' and hard cement in shoe track to 11,807' -400 gpm, 2410 psi, 15k ft/Ibs torque at 80 rpm, PUW 275k, SOW 115k, ROT Wt 148k Nrintea: ~itirzuua i:ao:a4 rnn ~ ~ BP EXPLORATION Page 10 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date -From - To Hours Task Code NPT Phase Description of Operations 2/10/2009 15:30 - 17:30 2.00 DRILL P TIEB1 Displace old LSND to new 8.5 ppg FloPro. Slow pump rates taken and recorded. 17:30 - 18:00 0.50 DRILL P TIEB1 Complete drilling out shoe at 11,812' and 5' of new formation to 11,817'. -420 gpm, 1480 psi, 8k ft/Ibs torque at 60 rpm, PUW 200k, SOW 145k, ROT Wt 160k 18:00 - 19:00 1.00 DRILL P TIE61 Circulate bottoms up while rotating and reciprocating. Monitor well -Static. 19:00 - 00:00 5.00 DRILL P TIEB1 POH from 11,817' to 2,231'. -MW in and out 8.5 ppg 2/11/2009 00:00 - 01:30 1.50 DRILL P TIE61 POH with 6 1/8" bit and BHA. LD jars, stand back DCs. Break off bit. Bit grade: 2-3-T-G-E-1/16-CT-TD 01:30 - 02:30 1.00 DRILL P PROD1 MU 6 1/8" tri-cone insert bit with 2.29 degree motor. RIH with BHA on 4" DP. 02:30 - 02:45 0.25 EVAL P PROD1 Shallow hole test MWD equipment. 02:45 - 05:30 2.75 DRILL P PROD1 RIH with 6 1/8" bit and BHA on 4" DP to 8,025' 05:30 - 07:00 1.50 DRILL P PROD1 Cut and slip 125' of drilling line, service top drive and blocks, service crown, inspect drawworks, calibrate MWD depth. 07:00 - 10:00 3.00 DRILL P PROD1 RIH with 6 1/8" bit and BHA on 4" DP to 10,128'. Continue to RIH with BHA on 5" DP to 10,817'. 10:00 - 11:00 1.00 DRILL P PROD1 Drill 6 1/8" production interval from 10,817' to 10,831' to make new hole for FIT -WOB 20k, 250 gpm, 1620 psi on, 1420 psi off, PUW 202k, SOW 135k, AST .3 hrs, ADT .3 hrs, Bit .3 hrs, MW in and out 8.5 Pp9 -Slow pump rates taken and recorded 11:00 - 12:00 1.00 EVAL P PROD1 RU test equipment. Conduct FIT: MW 8.5 ppg, EMW 10.2 ppg, ND 8,640', MD 11,812', test to 830 psi. Record test on chart for 10 min, good test. RD test equipment. 12:00 - 13:00 1.00 DRILL P PROD1 Drill ahead 6 1/8" production interval from 11,831'to 11,892' -250 gpm, psi on 1540, psi off 1430, PUW 205k, SOW 140k, MW in and out 8.5 ppg 13:00 - 13:30 0.50 EVAL P PROD1 MAD pass from 11,865' to 11,830' at 250 ft/hr, 250 gpm, 1430 psi per Geologist and DD to measure dogleg 13:30 - 19:00 5.50 DRILL P PROD1 Continue drilling from 11,865' to 12,019' per Geologist direction. -WOB 20k, 250 gpm, 1620 psi on, 1420 psi off, PUW 210k, SOW 135k, AST 4.42 hrs, ADT 4.42 hrs, Bit 4.42 hrs, MW in and out 8.5 ppg -Slow pump rates taken and recorded -Monitor well -Static 19:00 - 20:00 1.00 DRILL P PROD1 Circulate bottoms up. No increase in cuttings returns after bottoms up sweep. Monitor well -Static. MW in and out 8.5 PPg• 20:00 - 00:00 4.00 DRILL P PROD1 POH with 6 1/8" bit and BHA. Tight spot at 11,.887' with 25k overpull. Work tight area. Continue POH to shoe at 11,812'. Monitor well -Static. Pump dry job, POH to 2,678'. 2/12/2009 00:00 - 00:30 0.50 DRILL P PROD1 POH with 6 1/8" bit on 4" DP to 195' 00:30 - 02:00 1.50 DRILL P PROD1 Stand back DCs, LD MWD tool to reload data, break off 6 1/8" tri-cone insert bit. Bit grade: 1-1-WT-A-E-O-NO-BHA 02:00 - 03:30 1.50 DRILL P PROD1 MU 6 1/8" PDC bit with 1.50 degree AIM motor, Impulse MWD and ADN source Printed: 3/6/2009 1:45:44 PM • BP EXPLORATION Page 11 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours. Task Code NPT Phase Description of Operations 2/12/2009 03:30 - 04:00 0.50 EVAL P PROD1 RIH with 6 1/8" PDC bit and BHA on 4" DP; shallow hole test of MWD equipment at 1,180'. 04:00 - 08:30 4.50 DRILL P PROD1 Continue to RIH with 6 1/8" bit and BHA on 4" DP to 10,128', crossover to 5" DP to TD at 12,019'. 08:30 - 12:00 3.50 DRILL P PROD1 Drill 6 1/8" prodcution hole from 12,019' to 12,081' 12:00 - 00:00 12.001 DRILL P PROD1 2/13/2009 00:00 - 00:30 0.50 DRILL P PROD1 00:30 - 01:00 0.50 DRILL N SFAL PROD1 01:00 - 12:00 11.00 DRILL P 12:00 - 00:00 12.00 DRILL P PROD1 PROD1 -WOB 10k, 250 gpm, 1520 psi on, 1410 psi off, PUW 202k, SOW 137k, AST 2.07 hrs, ADT 2.07 hrs, Bit 2.07 hrs -Slow pump rates taken and recorded -MW in and out 8.5 ppg Drill 6 1/8" prodcution hole from 12,081' to 12,617' -WOB 10-15k, 250 gpm, 1785 psi on, 1615 psi off, 60 rpm, 7k ft/Ibs torque off, 8.5k ft/Ibs torque on, PUW 202k, SOW 137k, ROT Wt 165k, AST 3.52 hrs, ART 5.10 hrs, ADT 8.62 hrs, Bit 10.70 hrs -Slow pump rates taken and recorded -MW in and out 8.5 ppg Drill ahead in 6 1/8" production hole from 12,617' to 12,645' Lost communication with MWD tool. Circulate while resetting computer. When reset, Geologist concerned with Gamma / ADN reading. Circulate while Geologist consults with town. Readings okay, proceed with drilling. Drill 6 1/8" production hole from 12,645' to 13,091' -WOB 10-15k, 250 gpm, 1990 psi on, 1720 psi off, 60 rpm, 7.5k ft/Ibs torque off, 10k ft/Ibs torque on, PUW 208k, SOW 140k, ROT Wt 167k, AST 2.62 hrs, ART 4.25 hrs, ADT 6.87 hrs, Bit 16.94 hrs -Slow pump rates taken and recorded at 1130 hrs, 13,091' -MW in and out 8.6 ppg Drill 6 1/8" production hole from 13,091' to 13,715' -WOB 10-12k, 250 gpm, 2012 psi on, 1723 psi off, 60 rpm, 8k ft/Ibs torque off, 10k ft/Ibs torque on, PUW 215k, SOW 140k, ROT Wt 165k, AST 2.28 hrs, ART 6.40 hrs, ADT 8.68 hrs, Bit 26.25 hrs -Slow pump rates taken and recorded at 1500 hrs, 13,278' -MW in and out 8.6 ppg -During drilling, encountered planned close approach to F-21 ai 13 500'. Planned operations included notifying F-pad operator to shut in F-21 while drilling from 13,350' to 13,600', PJSM to nntifv avarvnna of plan. shutting down surface solids Control to get accurate straps on fluids re-calculate close approach des 12/14/2009 100:00 - 05:30 I 5.501 DRILL I P 05:30 - 09:30 4.00 DRILL P 09:30 - 13:00 3.50 DRILL P PROD1 PROD1 PROD1 asses[ in momtonng operatons. Drill 6 1/8" production hole from 13,715' to 13,980' -WOB 10-12k, 250 gpm, 2031 psi on, 1830 psi off, 60 rpm, 8k fUlbs torque off, 10k ft/Ibs torque on, PUW 220k, SOW 140k, ROT Wt 160k, AST .42 hrs, ART 2.87 hrs, ADT 3.29 hrs, Bit 29.54 hrs -Slow pump rates taken and recorded at 0530 hrs, 13,980' -MW in and out 8.6 ppg Circulate three bottoms up, monitor shakers. No increase in cuttings, mud properties good. POH. Backream out of hole at 225 gpm, 60 rpm from 13,980' rnntea: sitiizuua i:ao:aa rrh • e BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Spud Date: 9/5/1981 Event Name: REENTER+COMPLETE Start: 1/29/2009 End: 2/17/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date I, From - To Hours Task 'Code NPT Phase Description of Operations 2/14/2009 1 09:30 - 13:00 3.50 DRILL P PROD1 to 12,040'. Encountered 7k torque at 12,150'. No rotation from 12,150' to 12,040'. -MW in and out 8.6 ppb 13:00 - 16:00 3.00 EVAL P PROD1 MAD pass from 12,040' to 11,552' at 225 gpm, 350 fUhr with no rotation. 16:00 - 20:30 4.50 DRILL P PROD1 Monitor well -Static. Drop 2 1/4" rabbit, POH to 225'. 20:30 - 22:00 1.50 DRILL P PROD1 Monitor well -Static. PJSM on laying down BHA and handling nuclear source. LD BHA. Bit grade: 1-1-WT-G-X-I-NO-TD 22:00 - 23:00 1.00 CASE P RUNPRD RU liner running equipment. PJSM on running slotted liner. 23:00 - 00:00 1.00 CASE P RUNPRD RIH with 4 1/2" 12.63 L-80 IBT-M slotted liner. Shoe Baker-Locked to solid joint with Baker packoff bushing followed by slotted joints. Packoff bushing is contingency for 12/15/2009 00:00 - 07:30 7.501 CASE P 07:30 - 08:00 0.50 CASE P 08:00 - 09:30 1.50 CASE P 09:30 - 12:00 2.501 CASE P 12:00 - 14:30 I 2.501 CASE I P 14:30 - 22:00 I 7.501 CASE I P 22:00 - 23:00 I 1.001 CASE I P 23:00 - 00:00 I 1.001 CASE I P 12/16/2009 100:00 - 02:30 I 2.501 CASE I P make-up torque at 2800 Wlbs. RUNPRD RIH with 4 1/2" 12.6# L-80 IBT-M slotted liner. 53 slotted joints and 4 solid joints run with HMC Liner hanger and HRD ZP liner top packer. PUW 53k, SOW 50k. No centralizers run. Average make-up torque 2800 Wlbs. Continue to RIH on 4" DP to 11,802'. RUNPRD Circulate 1 1/2 times DP volume before entering open hole at 11,812'. RUNPRD Continue to RIH with slotted liner on 4" DP to 12,280'. MU 5" crossover and continue to RIH on 5" DP to TD at 13,980'. PU 2' from bottom to 13,978'. PUW 230k, SOW 125k. RUNPRD Circulate drill pipe volume to confirm clear prior to dropping ball to set liner. Drop 29/32" ball and pump down at 3 bpm, slowing- to 1.5 bpm at 1050 strokes (1/2 string capacity). Se` at ball. Pressure up to 2200 psi to set liner hanger. Slack off 25k to ensure liner is set. Pressure up to 3200 psi to set packer. Ball and seat sheared prematurely at 3200 si. HR releasing toll not activated. PU to check release, liner still attached to ntor, s to et XP stinger. Lay down 2 joints drill pipe. Slotted liner shoe at 13,978'. Baker pack-off bushing at 13,935'. Top of liner at 11,644'. PBR 11.77' long 5.25" ID RUNPRD Pump 100 bbls of fresh water followed by 30 bbl sweep. Displace well with 625 bbls clean seawater. Reciprocating pipe 85' while displacing mud to seawater. RUNPRD POH laying down 5" and 4" DP one by one. LD Baker running tool. Confirmation pins sheared on dog sub. RUNPRD MU mule shoe, RIH with remaining stands of 5" DP in order to lay down one by one. RUNPRD Cut and slip 115' of drilling line. Inspect and service drawworks and top drive. RUNPRD Lay down drill pipe one by one. Apply left hand torque of 5K to HRD tool and slowly work torque down to emergency release. Close annular preve pressure up 4" drill pipe x 7" liner to 1500 psi for 5 minute confirm ZXP liner to acker set. Pick up out of liner to s dogs. Set down 40k twice and once rotating to confirm Z liner top packer set. Pick up and pull out of liner top with Printed: 3/6/2009 1:45:44 PM • • BP EXPLORATION Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From - To Hours Task Code NPT __ 2/16/2009 02:30 - 03:30 1.00 BUNCO 02:30 - 05:30 I 3.00 05:30 - 07:00 I 1.50 07:00 - 21:30 I 14.501 RU 21:30 - 23:00 I 1.501 RUN 23:00 - 00:00 1.00 2/17/2009 00:00 - 03:30 3.50 03:30 - 05:00 1.50 05:00 - 05:30 I 0.501 RU 05:30 - 07:30 07:30 - 10:00 10:00 - 11:30 11:30 - 15:30 Start: 1 /29/2009 Rig Release: Rig Number: Page 13 of 14 Spud Date: 9/5/1981 End: 2/17/2009 Phase Description of Operations RUNCMP Pull wear ring. Make up test joint to tubing hanger. Make dummy run with tubing hanger. Lay down test joint and tubing hanger. RUNCMP Change out bails, rig up completion running equipment with compensator and torque turn computer. RUNCMP PJSM on MU, RIH with completion tubing. MU Tailpipe assembly per running detail. Place one full joint below Baker S-3 packer, Baker-Lok all connections below packer. RUNCMP RIH with 4 1/2" 12.6# 13Cr Vam Top completion tubing. Make-up torque 4440 ft/Ibs. Connections are coated with new thread compound "Cleanwell", which is compatible with Jet Lube Seal, so no additional dope was used in box. Vam representative Jose Lopez and Sumitomo Metals representative Takuya Tsujimura on hand to observe completion assembly and RIH. Job went well and no issues with connections. RUNCMP Swallow WLEG into liner to PBR. Pick u r - Pick up, rotate 1/2 turn to tag liner top. Pick up and re-tag to confirm liner top at 11,639'. Pick up, rotate 1/2 turn and swallow WLEG into PBR again to confirm space out. Lay down joints, pick up 2.06' pup and joint 270. Make up tubing hanger and land. Run in lock-down screws. Space_ out has WLEG 6.83' inside of PBR. RUNCMP Reverse circulate with clean seawater followed by seawater treated with corrosion inhibitor. Displace to position inhibited seawater between GLM #3 and top of production packer. RUNCMP Reverse circulate with clean seawater followed by seawater treated with corrosion inhibitor. Displace to position inhibited seawater between GLM #3 and top of production packer. RUNCMP Drop ball and rod to set packer. Test tubin to 3500 si for 30 min, c arted. eed to 1500 psi. Pressure up to 3500 psi to test annu us for 30 min, charted. Good tests. Bleed pressure to 0 psi. Re-pressure annulus and shear DCK valve with 2700 psi. Pump 5 bbls each way to confirm shear. Positive flow confirmed shear. -Tubing test: lost 10 psi in first 15 min and 0 psi in second 15 min. -Annulus test: lost 5 psi in first 15 min and 5 psi in second 15 min. RUNCMP Install TWC and test from below via DCK shear valve to 1000 2.00 BOPSU P RUNCMP ND BOP 2.50 WHSUR P RUNCMP NU adapter flange and tree. 1.50 WHSUR P RUNCMP Test adapter, tree and packoff to 5000 psi with diesel and check for leaks. Rig up Drill Site Maintenance lubricator and ull TWC. 4.00 WHSUR P RUNCMP PJSM on rigging up, freeze protect procedure. Rig up Little Red Hot Oil Services. Test lines to 3500 psi. Reverse circulate 152 bbls diesel into inner annulus. Line up and allow to U-tube into tubing to freeze protect to 2200' TVD (2207' md). 15:30 - 16:30 ~ 1.00 ~ WHSUR ~ P ~ ~ RUNCMP ~ Install BPV, test with Little Red from below to 1000 psi. Rig Printetl: 3/62009 1:45:4a Pm r BP EXPLORATION Operations Summary Report Legal Well Name: F-19 Common Well Name: F-19 Event Name: REENTER+COMPLETE Start: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours ` Task Code NPT Phase 1 /29/2009 Page 14 of 14 Spud Date: 9/5/1981 End: 2/17/2009 Description of Operations 2/17/2009 15:30 - 16:30 1.00 WHSUR P RUNCMP down LRHOS. 16:30 - 18:00 1.50 WHSUR P RUNCMP Secure well, break service lines, release rig at 1800 hrs rnmeo: aioizuua 1:4D:441'M by F-19A Survev Report Schlumberger Client: BP Exploration Alaska Field: Prudhoe Bay Unit- WOA SVucture 1 Slot: F-PAD / F-19 Well: F-19 Borehole: F-19A UWIIAPI#: 5002920629 Survey Name 1 Date: F-19A /February 14, 2009 Tort 1 AHD / DDI 1 ERD ratio: 340.334° / 9211.07 ft / 6.703 11.060 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaHLong: N 70.33586791, W 148.76147841 LocaOon Grid NIE YIX: N 5973969.000 ftUS, E 652649.000 ftUS Grid Convergence Angle: +1.16631335° Grid Scale Factor: 0.99992647 Vertical Section Azimuth: 11.160° vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 64.93 ft relative to MSL Base Flange Elevation: 37.93 ft relative to MSL Magnetic Declination: 22.824° Total Field Strength: 57698.755 nT Magnetic Dip: 80.931 ° Declination Date: February 09, 2009 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corr Mag North •> True North: +22.824° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de k ft ft ft ft it ft de 1100 ft ftUS ftUS Nrolectea-up u. uu u.uu u.uu -n4. aa u ~u u. uu u.uu u.uu u.uv u.uv u.uu ayloyoy. vv oaco9a. vu Iv lu. ~~aoolyl vv 190. /019!091 WRP 26. 00 0.00 0.00 -38. 93 26. 00 0. 00 0.00 0.00 0.00 0.00 0.00 5973969. 00 652649. 00 N 70. 33586791 W 148 .76147841 Gyrodata GYD CT 93. 55 0.15 309.08 28. 62 93. 55 0. 04 0.09 0.09 0.06 -0.07 0.22 5973969. 05 652648. 93 N 70. 33586806 W 148 .76147896 12/14/08 193. 55 0.33 172.40 128. 62 193. 55 -0. 17 0.37 0.20 -0.15 -0.13 0.45 5973968. 85 652648. 87 N 70. 33586751 W 148 .76147948 293. 55 0.41 220.38 228. 62 293. 55 -0. 75 0.98 0.78 -0.71 -0.33 0.31 5973968. 29 652648. 69 N 70. 33586598 W 148 .76148105 393. 55 0.53 196.71 328. 61 393. 54 -1. 53 1.79 1.58 -1.42 -0.69 0.23 5973967. 57 652648. 34 N 70. 33586403 W 148 .76148401 493. 55 0.56 184.31 428. 61 493. 54 -2. 47 2.73 2.50 -2.35 -0.86 0.12 5973966. 63 652648. 19 N 70. 33586148 W 148 .76148539 593. 55 0.36 168.08 528. 61 593. 54 -3. 25 3.53 3.25 -3.15 -0.83 0.24 5973965. 84 652648. 23 N 70. 33585931 W 148 .76148516 693. 55 0.24 164.54 628. 61 693. 54 -3. 72 4.06 3.72 -3.65 -0.71 0.12 5973965. 33 652648. 36 N 70. 33585792 W 148 .76148418 793. 55 0.50 172.34 728. 60 793 .53 -4. 32 4.70 4.33 -4.29 -0.60 0.26 5973964. 70 652648. 49 N 70. 33585619 W 148 .76148325 893. 55 0.14 137.65 828. 60 893 .53 -4. 81 5.25 4.83 -4.81 -0.46 0.39 5973964. 18 652648. 64 N 70. 33585476 W 148 .762 993. 55 0.12 120.57 928. 60 993 .53 -4. 92 5.47 4.96 -4.96 -0.28 0.04 5973964 .04 652648. 82 N 70. 33585437 W 148 .761 2 1093. 55 0.37 166.68 1028. 60 1093 .53 -5. 25 5.88 5.32 -5.32 -0.12 0.30 5973963 .68 652648. 99 N 70 .33585337 W 148 .76147938 1193. 55 0.07 196.39 1128. 60 1193 .53 -5. 60 6.26 5.70 -5.70 -0.06 0.31 5973963 .30 652649. 05 N 70 .33585235 W 148 .76147892 1293. 55 0.10 222.61 1228. 60 1293 .53 -5. 74 6.41 5.82 -5.82 -0.14 0.05 5973963 .18 652648. 98 N 70 .33585201 W 148 .76147954 1393. 55 0.81 8.93 1328. 60 1393 .53 -5. 10 7.07 5.19 -5.18 -0.09 0.89 5973963 .82 652649. 02 N 70 .33585374 W 148 .76147913 1493. 55 3.69 17.65 1428. 51 1493 .44 -1. 20 10.99 1.73 -1.42 1.00 2.89 5973967 .60 652650. 03 N 70 .33586403 W 148 .76147032 1593. 55 4.96 13.42 1528. 22 1593 .15 6. 32 18.52 6.57 5.85 2.98 1.31 5973974 .91 652651 .86 N 70 .33588390 W 148 .76145426 1693. 55 5.12 14.53 1627. 84 1692 .77 15. 09 27.31 15.25 14.38 5.10 0.19 5973983 .48 652653 .80 N 70 .33590718 W 148 .76143704 1793. 55 5.85 23.17 1727. 38 1792 .31 24. 53 36.85 .24.79 23.38 8.22 1.10 5973992 .54 652656 .75 N 70 .33593178 W 148 .76141169 1893. 55 8.32 42.96 1826. 62 1891 .55 35. 67 49.07 36.65 33.36 15.16 3.44 5974002 .66 652663 .48 N 70 .33595906 W 148 .76135541 1993. 55 9.12 43.69 1925. 47 1990 .40 48. 50 64.23 51.23 44.39 25.57 0.81 5974013 .90 652673 .66 N 70 .33598918 W 148 .76127100 2093. 55 10.45 36.58 2024 .01 2088 .94 63. 37 81.20 68.00 57.40 36.45 1.79 5974027 .13 652684 .27 N 70 .33602473 W 148 .76118274 SurveyEditor Ver SP 2.1 Bld(doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 1 of 10 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS Llas.ao 2293.55 2318.55 2343.55 2368.55 2393.55 2418.55 2443.55 2468.55 2493.55 2518.55 2543.55 2568.55 2593.55 2618.55 2643.55 2668.55 2693.55 2718.55 2743.55 2768.55 2793.55 2818.55 2843.55 2868.55 2893.55 2918.55 2943.55 2968.55 2993.55 3018.55 3043.55 3068.55 3093.55 3118.55 3143.55 3168.55 3193.55 3218.55 3243.55 3268.55 ll.yl 14.25 15.03 15.71 16.00 16.47 16.88 17.35 17.95 18.46. 19.16 19.77 20.65 21.38 21.77 22.25 22.50 22.74 23.35 23.69 24.15 25.09 26.53 27.56 28.24 29.35 30.15 30.66 31.18 31.73 32.34 33.03 34.35 35.48 36.14 36.76 37.56 38.88 39.62 40.61 41.35 Zl./4 L-ILL.IJ L10/.VO OI./ I IUV.•FO 15.49 2219.54 2284.47 104.13 123.09 14.03 12.67 12.44 12.09 12.15 11.86 11.72 11.52 11.40 11.23 2243.72 2267.83 2291.88 2315.88 2339.83 2363.72 2387.55 2411.29 2434.96 2458.53 2308.65 110.44 129.41 2332.76 117.06 136.04 2356.81 123.89 142.87 2380.81 130.88 149.86 2404.76 138.05 157.03 10.93 10.67 10.58 10.34 10.34 10.34 10.23 10.26 10.19 9.91 9.04 8.73 8.62 8.56 8.74 8.90 9.29 9.79 10.33 10.16 8.70 7.67 7.30 6.60 5.64 4.92 4.62 4.29 4.23 2428.65 2452.48 2476.22 2499.89 2523.46 2481.99 2546.92 2505.33 2570.26 2528.58 2593.51 2551.75. 2616.68 2574.87 2639.80 2597.95 2662.88 2620.95 2685.88 2643.88 2708.81 2666.73 2731.66 2689.46 2754.39 2711.96 2734.23 2756.32 2778.23 2799.94 2776.89 2799.16 2821.25 2843.16 2864.87 2821.50 2842.94 2864.27 2885.46 2906.50 2927.31 2947.81 2968.08 2988.19 3008.11 3027.75 3047.11 3066.23 3085.10 2886.43 2907.87 2929.20 2950.39 2971.43 2992.24 3012.74 3033.01 3053.12 3073.04 3092.68 3112.04 3131.16 3150.03 145.40 152.98 160.79 168.85 177.19 185.82 194.79 203.98 213.35 222.86 232.48 242.26 252.24 262.37 272.79 283.67 295.02 306.71 318.74 331.13 343.78 356.61 369.65 382.91 396.41 410.27 424.56 439.16 453.97 469.01 484.40 500.12 516.11 532.39 164.39 171.97 179.78 187.84 196.17 204.81 213.77 222.96 232.33 241.85 251.46 261.25 271.23 281.36 291.78 302.66 314.03 325.73 337.77 350.18 362.83 375.67 388.72 401.98 415.48 O/.LU 109.32 115.45 121.87 128.49 135.27 142.25 149.43 156.83 164.47 172.37 180.54 189.02 197.83 206.87 216.10 225.48 234.97 244.63 254.49 264.52 274.83 285.59 296.83 308.39 320.30 332.59 345.13 357.88 370.85 384.04 397.49 / Y. LO 95.73 101.84 108.28 114.95 121.78 128.79 135.99 143.41 151.06 158.96 167.13 175.60 184.41 193.45 202.66 212.02 221.48 231.11 240.93 250.90 261.16 271.89 283.13 294.69 306.60 318.86 331.36 344.05 356.91 369.97 383.26 429.35 411.28 396.93 443.66 425.49 411.10 458.28 440.00 425.60 473.14 454.72 440.34 488.24 469:66 455.36 503.70 484.95 470.76 519.52 500.57 .486.52 535.63 516.48 502.58 552.02 532.68 518.93 9J.00 52.79 54.39 55.92 57.41 58.89 60.40 61.93 63.48 65.05 66.65 68.28 69.94 71.62 73.32 75.02 76.73 78.45 80.20 81.97 83.77 85.59 87.38 89.14 90.90 92.70 94.56 96.50 98.54 100.70 103.01 105.42 107.68 109.72 111.63 113.42 115.03 116.45 117.77 119.02 120.24 J.LI J~7/YVV`1. 1.7 VJLV.7J.IJ IY /V.JJVVI VVG YV 17V.IVIIVI VV 2.73 5974065.77 652699.82 N 70.33612942 W 148.76105019 3.45 5974071.91 3.08 5974078.39 1.19 5974085.09 1.92 5974091.94 1.64 5974098.99 1.91 5974106.21 2.41 5974113.66 2.06 5974121.34 2.80 5974129.27 2.45 5974137.47 3.54 5974145.98 2.94 5974154.82 1.57 5974163.88 1.95 5974173.13 1.00 5974182.52 0.96 5974192.02 2.45 5974201.68 1.36 5974211.53 1.84 5974221.54 3.79 5974231.83 5.96 5974242.60 4.16 5974253.86 2.73 5974265.46 4.44 5974277.40 3.22 5974289.70 2.07 5974302.23 2.23 5974314.96 2.43 5974327.86 2.70 5974340.96 2.78 5974354.29 6.19 5974368.01 5.10 5974382.21 2.78 5974396.75 2.99 5974411.53 3.95 5974426.57 5.57 5974442.00 3.06 5974457.78 4.05 5974473.86 2.96 5974490.23 652701.31 652702.70 652704.05 652705.40 652706.76 652708.14 652709.54 652710.96 652712.40 652713.86 652715.35 652716.85 652718.36 652719.87 652721.39 652722.92 652724.47 652726.05 652727.64 652729.25 652730.82 652732.35 652733.88 652735.43 652737.05 652738.73 652740.51 652742.41 652744.46 652746.59 652748.58 652750.32 652751.93 652753.43 652754.73 652755.84 652756.83 652757.76 652758.64 N 70.33614611 W 148.76103715 N 70.33616373 W 148.76102475 N 70.33618194 W 148.76101271 N 70.33620060 W 148.76100067 N 70.33621976 W 148.76098845 N 70.33623942 W 148.76097603 N 70.33625969 W 148.76096347 N 70.33628059 W 148.76095071 N 70.33630217 W 148.7602 N 70.33632449 W 148.76 6 N 70.33634764 W 148.76091100 N 70.33637170 W 148.76089737 N 70.33639639 W 148.76088362 N 70.33642156 W 148.76086982 N 70.33644713 W 148.76085596 N 70.33647297 W 148.76084196 N 70.33649928 W 148.76082779 N 70.33652610 W 148.76081339 N 70.33655335 W 148.76079879 N 70.33658137 W 148.76078405 N 70.33661070 W 148.76076953 N 70.33664138 W 148.76075529 N 70.33667297 W 148.76074098 N 70.33670550 W 148.76072639 N 70.33673901 W 148.76071125 N 70.33677316 W 148.76069551 N 70.33680782 W 148.763 N 70.33684296 W 148.76 9 N 70.33687863 W 148.76064269 N 70.33691492 W 148.76062321 N 70.33695230 W 148.76060480 N 70.33699099 W 148.76058829 N 70.33703061 W 148.76057283 N 70.33707089 W 148.76055825 N 70.33711190 W 148.76054520 N 70.33715398 W 148.76053366 N 70.33719704 W 148.76052299 N 70.33724091 W 148.76051284 N 70.33728558 W 148.76050296 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 2 of 10 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 31y3 .bb 4'L. IU 4.L4 JlU3. /6 31bt5. by b4tS .y1 96t5. b6 04y.13 035 .OZ 1Z1. 4U 3.UU 0`J/4bUO. tS~ b~Z/~y. ~3 N /V. 33/33Vy1 VV 1415. /OU4`JYy`J 3318 .55 42. 85 4.22 3122. 20 3187. 13 565 .67 585. 54 565. 83 552 .36 122. 71 3.00 5974523. 70 652760. 43 N 70. 33737690 W 148. 76048289 3343 .55 43. 54 4.21 3140. 43 3205. 36 582 .65 602. 66 582. 76 569 .43 123. 97 2.76 5974540. 79 652761. 34 N 70. 33742353 W 148. 76047268 3368 .55 44. 24 4.24 3158. 44 3223. 37 599 .86 619. 99 599. 93 586 .71 125. 24 2.80 5974558. 09 652762. 27 N 70. 33747075 W 148. 76046232 3393 .55 44. 98 4.21 3176. 24 3241. 17 617 .29 637. 55 617. 33 604 .22 126. 54 2.96 5974575. 62 652763. 20 N 70. 33751858 W 148. 76045182 3418 .55 45. 86 4.25 3193. 79 3258. 72 634 .96 655. 35 634. 98 621 .98 127. 85 3.52 5974593. 40 652764. 16 N 70. 33756709 W 148. 76044117 3443 .55 46. 57 4.27 3211. 09 3276. 02 652 .88 673. 40 652. 89 639 .98 129. 19 2.84 5974611. 42 652765. 13 N 70. 33761626 W 148. 76043029 3468 .55 47. 27 4.28 3228. 16 3293. 09 671 .01 691. 66 671. 01 658 .19 130. 55 2.80 5974629. 66 652766. 12 N 70. 33766601 W 148. 76041924 3493 .55 48. 07 4.36 3245. 00 3309. 93 689 .36 710. 14 689. 36 676 .61 131. 95 3.21 5974648. 11 652767. 14 N 70. 33771636 W 148. 76040794 3518 .55 48. 70 4.40 3261. 60 3326. 53 707 .92 728. 83 707. 93 695 .25 133. 37 2.52 5974666. 77 652768. 18 N 70. 33776727 W 148. 76039636 3543 .55 49. 29 4.40 3278. 00 3342. 93 726 .65 747. 70 726. 68 714 .06 134. 82 2.36 5974685. 60 652769. 25 N 70. 33781866 W 148. 7661 3568 .55 49. 87 4.39 3294. 21 3359. 14 745 .55 766. 73 745. 60 733 .04 136. 28 2.32 5974704. 60 652770. 32 N 70. 33787050 W 148. 760 78 3593 .55 50. 51 4.42 3310. 22 3375. 15 764 .62 785. 94 764. 70 752 .19 137. 75 2.56 5974723. 78 652771. 41 N 70. 33792281 W 148. 76036081 3618 .55 51. 02 4.41 3326. 03 3390. 96 783 .85 805. 30 783. 96 771 .49 139. 24 2.04 5974743. 11 652772. 50 N 70. 33797555 W 148. 76034871 3643 .55 51. 36 4.42 3341. 70 3406. 63 803 .20 824. 78 803. 34 790 .91 140. 74 1.36 5974762. 56 652773. 61 N 70. 33802861 W 148. 76033654 3668 .55 51. 15 4.49 3357. 35 3422. 28 822 .56 844. 28 822. 75 810 .35 142. 26 0.87 5974782. 02 652774. 73 N 70. 33808172 W 148. 76032425 3693 .55 51. 17 4.50 3373. 03 3437. 96 841 .91 863. 75 842. 13 829 .77 143. 78 0.09 5974801. 46 652775. 86 N 70. 33813475 W 148. 76031187 3718 .55 51. 24 4.52 3388. 69 3453. 62 861 .26 883. 24 861. 54 849 .19 145. 32 0.29 5974820. 91 652776. 99 N 70. 33818782 W 148. 76029943 3743 .55 51. 10 4.53 3404. 37 3469. 30 880 .60 902. 71 880. 93 868 .61 146. 85 0.56 5974840. 35 652778. 13 N 70. 33824086 W 148. 76028696 3768 .55 51. 33 4.52 3420. 03 3484. 96 899 .96 922. 20 900. 35 888 .03 148. 39 0.92 5974859. 80 652779. 27 N 70. 33829393 W 148. 76027449 3793 .55 51. 18 4.49 3435. 67 3500. 60 919 .33 941. 70 919. 77 907 .47 149. 92 0.61 5974879. 27 652780. 41 N 70. 33834703 W 148. 76026206 3818 .55 51. 21 4.49 3451. 34 3516. 27 938 .68 961. 18 939. 18 926 .89 151. 45 0.12 5974898. 71 652781. 54 N 70. 33840009 W 148. 76024968 3843 .55 51. 25 4.48 3466. 99 3531. 92 958 .04 980. 67 958. 61 946 .33 152. 97 0.16 5974918. 17 652782. 67 N 70. 33845318 W 148. 76023731 3868 .55 51. 17 4.55 3482. 65 3547. 58 977 .39 1000. 16 978. 03 965 .75 154. 51 0.39 5974937. 62 652783. 81 N 70. 33850625 W 148. 76022486 3893 .55 51. 29 4.58 3498. 31 3563. 24 996 .76 1019. 65 997. 46 985 .18 156. 06 0.49 5974957. 08 652784. 96 N 70. 33855933 W 148. 76021227 3918 .55 51. 04 4.62 3513. 99 3578. 92 1016 .10 1039. 12 1016. 88 1004 .59 157. 62 1.01 5974976. 52 652786. 13 N 70. 33861236 W 148. 76019960 3943 .55 51. 14 4.68 3529. 69 3594. 62 1035 .43 1058. 58 1036 .28 1023 .98 159. 20 0.44 5974995. 93 652787. 31 N 70. 33866533 W 148. 76018680 3968 .55 51. 12 4.68 3545. 38 3610. 31 1054 .77 1078. 04 1055 .70 1043 .38 160. 78 0.08 5975015. 36 652788. 50 N 70. 33871833 W 148. 7 1 3993 .55 51. 03 4.69 3561. 09 3626. 02 1074 .10 1097. 49 1075 .10 1062 .76 162. 37 0.36 5975034. 77 652789. 70 N 70. 33877128 W 148. 6 76 2 4018 .55 51. 09 4.70 3576. 80 3641. 73 1093 .42 1116. 93 1094 .50 1082 .14 163. 96 0.24 5975054. 18 652790. 89 N 70. 33882423 W 148. 760 10 4043 .55 51. 05. 4.70 3592. 51 3657. 44 1112 .74 1136. 38 1113 .90 1101 .53 165. 56 0.16 5975073. 59 652792. 09 N 70. 33887718 W 148. 76013517 I, 4068 .55 50. 95 4.67 3608. 24 3673 .17 1132 .05 1155. 81 1133 .28 1120 .89 167. 14 0.41 5975092. 98 652793. 28 N 70. 33893008 W 148. 76012229 4093 .55 51. 14 4.66 3623. 96 3688 .89 1151 .36 1175. 25 1152 .68 1140 .27 168. 73 0.76 5975112. 38 652794. 47 N 70. 33898301 W 148. 76010946 4118 .55 50. 98 4.63 3639. 67 3704 .60 1170 .68 1194. 70 1172 .09 1159 .65 170. 30 0.65 5975131. 79 652795. 65 N 70. 33903596 W 148. 76009668 4143 .55 51. 08 4.64 3655. 39 3720 .32 1189 .99 1214. 13 1191 .48 1179 .02 171. 87 0.40 5975151. 19 652796. 83 N 70. 33908889 W 148. 76008393 4168 .55 51. 05 4.59 3671. 10 3736 .03 1209 .31 1233. 58 1210 .89. 1198 .41 173. 44 0.20 5975170. 60 652798. 00 N 70. 33914184 W 148 .76007124 4193 .55 50. 93 4.65 3686. 84 3751 .77 1228 .61 1253. 01 1230 .28 1217 .77 175. 00 0.51 5975189 .99 652799. 17 N 70. 33919474 W 148 .76005854 4218 .55 51. 15 4.60 3702. 56 3767 .49 1247 .93 1272. 45 1249. .68 1237 .14 176. 57 0.89 5975209. 39 652800. 34 N 70. 33924767 W 148 .76004581 4243 .55 51. 02 4.65 3718. 26 3783 .19 1267 .25 1291. 90 1269 .10 1256 .53 178. 14 0.54 5975228 .80 652801. 51 N 70. 33930064 W 148 .76003309 4268 .55 51. 11 4.62 3733. 98 3798 .91 1286 .57 1311. 34 1288 .51 1275 .92 179. 71 0.37 5975248 .21 652802. 69 N 70. 33935359 W 148 .76002033 4293 .55 50 .97 4.63 3749. 70 3814 .63 1305 .88 1330. 78 1307 .92 1295 .29 181. 28 0.56 5975267 .62 652803. 86 N 70. 33940652 W 148 .76000761 SurveyEditor Ver SP 2.1 Bld(doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 3 of 10 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure k de de k k k k k k k de 100 k kUS kUS 4318 .55 50. 41 4.60 4343 .55 50. 67 4.62 4368 .55 51. 04 4.63 4393 .55 51. 18 4.57 4418 .55 51. 06 4.58 4443.55 4468.55 4493.55 4518.55 4543.55 50.97 50.64 50.65 50.63 50.65 4.55 4.49 4.46 4.46 4.49 4568.55 4593.55 4618.55 4643.55 4668.55 4693.55 4718.55 4743.55 4768.55 4793.55 4818.55 4843.55 4868.55 4893.55 4918.55 4943.55 4968.55 4993.55 5018.55 5043.55 5068.55 5093.55 5118.55 5143.55 5168.55 5193.55 5218.55 5243.55 5268.55 5293.55 50.65 50.52 50.37 50.45 50.44 50.63 50.89 50.52 50.38 50.46 50.20 50.40 50.37 50.17 50.48 50.09 50.36 50.46 50.31 50.24 49.98 50.20 50.14 49.90 50.19 50.13 50.10 49.84 49.75 49.99 4.51 4.45 4.49 4.50 4.53 4.50 4.56 4.54 4.56 4.51 4.49 4.44 4.43 4.45 4.42 4.48 4.44 4.45 4.50 4.56 4.62 4.71 4.67 4.71 4.71 4.68 4.71 4.74 4.84 4.84 3765.53 3781.42 3797.20 3812.90 3828.59 3844.32 3860.12 3875.97 3891.83 3907.68 3923.53 3939.41 3955.33 3971.26 3987.18 4003.07 4018.88 4034.72 4050.63 4066.56 4082.52 4098.49 4114.43 4130.41 4146.37 4162.35 4178.34 4194.27 4210.21 4226.19 4242.22 4258.26 4274.28 4290.34 4306.39 4322.41 4338.44 4354.52 4370.66 4386.77 3830.46 1325.10 1350.13 1327.23 1314.57 3846.35 1344.28 1369.43 1346.50 1333.81 3862.13 1363.54 1388.82 1365.85 1353.14 3877.83 1382.87 1408.28 1385.28 1372.53 3893.52 1402.20 1427.74 1404.71 1391.93 3909.25 1421.51 1447.17 1424.12 1411.30 3925.05 1440.75 1466.55 1443.46 1430.62 3940.90 1459.95 1485.88 1462.76 1449.89 3956.76 1479.15 1505.21 1482.07 1469.16 3972.61 1498.35 1524.54 1501.37 1488.43 3988.46 1517.55 1543.87 1520.67 1507.70 4004.34 1536.73 1563.18 1539.96 1526.96 4020.26 1555.88 1582.46 1559.21 1546.18 4036.19 1575.01 1601.72 1578.45 1565.38 4052.11 1594.16 1621.00 1597.70 1584.60 4068.00 4083.81 4099.65 4115.56 4131.49 4147.45 4163.42 4179.36 4195.34 4211.30 4227.28 4243.27 4259.20 4275.14 4291.12 4307.15 4323.19 4339.21 4355.27 4371.32 4387.34 4403.37 4419.45 4435.59 4451.70 1613.33 1640.30 1616.98 1603.84 1632.56 1659.66 1636.32 1623.14 1651.78 1679.01 1655.65 1642.43 1670.93 1698.28 1674.90 1661.64 1690.07 1717.55 1694.15 1680.85 1709.18 1736.80 1713.37 1700.04 1728.29 1756.03 1732.59 1719.21 1747.41 1775.29 1751.82 1738.41 1766.51 1794.52 1771.03 1757.58 1785.62 1813.76 1790.25 1776.77 1804.72 1823.80 1842.93 1862.06 1881.16 1900.22 1919.27 1938.35 1957.38 1976.42 1995.50 2014.56 2033.58 2052.56 2071.55 1832.99 1852.20 1871.47 1890.73 1909.96 1929.14 1948.31 1967.51 1986.67 2005.83 2025.03 2044.21 2063.36 2082.45 2101.56 1809.46 1828.66 1847.90 1867.15 1886.36 1905.52 1924.68 1943.87 1963.01 1982.16 2001.35 2020.52 2039.65 2058.73 2077.84 182.83 184.38 185.95 187.51 189.06 190.61 192.13 193.64 195.14 196.65 198.17 199.68 201.18 202.69 204.21 205.73 207.26 208.79 210.32 211.84 213.35 214.85 216.34 217.83 219.32 1795.94 220.81 1815.09 222.30 1834.30 223.80 1853.50 225.30 1872.67 226.82 2.24 5975286.92 1.04 5975306.19 1.48 5975325.54 0.59 5975344.96 0.48 5975364.39 0.37 5975383.78 1.33 5975403.13 0.10 5975422.42 0.08 5975441.72 0.12 5975461.01 0.06 5975480.31 0.55 5975499.59 0.61 5975518.83 0.32 5975538.07 0.10 5975557.31 0.77 5975576.57 1.06 5975595.90 1.48 5975615.21 0.56 5975634.45 0.36 5975653.69 1.04 5975672.90 0.81 5975692.10 0.12 5975711.32 0.80 5975730.52 1.24 5975749.73 1.57 5975768.93 1.09 5975788.11 0.40 5975807.34 0.62 5975826.56 0.34 5975845.76 1891. 79 228 .35 1.06 5975864 .90 1910. 90 229 .91 0.92 5975884 .04 1930. 04 231 .48 0.27 5975903 .20 1949. 13 233 .05 0.97 5975922 .32 1968. 23 234 .62 1.16 5975941 .45 1987. 36 236 .19 0.26 5975960 .61 2006. 48 237 .76 0.15 5975979 .75 2025. 56 239 .34 1.04 5975998 .86 2044. 58 240 .93 0.47 5976017 .91 2063. 63 242 .55 0.96 5976036 .98 652805.02 N 70.33945920 W 148.75999498 652806.18 N 70.33951176 W 148.75998239 652807.35 N 70.33956455 W 148.75996970 652808.52 N 70.33961754 W 148.75995703 652809.68 N 70.33967054 W 148.75994443 652810.83 N 70.33972346 W 148.75993188 652811.96 N 70.33977622 W 148.75991949 652813.08 N 70.33982887 W 148.75990725 652814.19 N 70.33988152 W 148:75989504 652815.30 N 70.33993417 W 148.75988280 652816.43 652817.54 652818.65 652819.77 652820.90 652822.03 652823.16 652824.30 652825.44 652826.57 652827.69 652828.80 652829.90 652830.99 652832.09 N 70.33998682 W 148.759 N 70.34003942 W 148.75 5 N 70.34009192 W 148.75984605 N 70.34014439 W 148.75983380 N 70.34019688 W 148.75982148 N 70.34024945 W 148.75980915 N 70.34030218 W 148.75979674 N 70.34035487 W 148.75978428 N 70.34040736 W 148.75977187 N 70.34045984 W 148.75975950 N 70.34051225 W 148.75974725 N 70.34056463 W 148.75973509 N 70.34061709 W 148.75972300 N 70.34066946 W 148.75971092 N 70.34072187 W 148.75969884 652833.19 N 70.34077424 W 148.75968673 652834.30 N 70.34082658 W 148.75967460 652835.40 N 70.34087905 W 148.75966248 652836.51 N 70.34093150 W 148.759 652837.64 N 70.34098387 W 148.75 6 652838.78 N 70.34103610 W 148.75962550 652839.95 N 70.34108832 W 148.75961284 652841.13 N 70.34114059 W 148.75960010 652842.31. N 70.34119275 W 148.75958738 652843.50 N 70.34124493 W 148.75957461 652844.68 N 70.34129719 W 148.75956185 652845.86 N 70.34134942 W 148.75954911 652847.05 N 70.34140154 W 148.75953631 652848.25 N 70.34145352 W 148.75952336 652849.48 N 70.34150555 W 148.75951027 SurveyEditor Ver SP 2.1 Bld(doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 4 of 10 Comments Measured Inclination Azimuth Sub•Sea ND 7yp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft 8 tt R R ft de 1100 ft ftUS ftUS 03"18 A0 4y .0U 4.8/ 44VL. `J3 440/ .80 LU`JV. OL CILU .04 LV`J0. `J-I LV8L. 04 L44 .10 I.`JO 0`J/OV00 .UL O8G80U ./V IV /U .J4180/4`J VV 148 ./8`J4`J/l0 5343. 55 49 .96 5.02 4419. 09 4484 .02 2109. 48 2139 .72 2115. 97 2101. 65 245 .81 1.90 5976075 .05 652851 .96 N 70 .34160941 W 148 .75948382 5368. 55 49 .88 5.30 4435. 18 4500 .11 2128. 50 2158 .85 2135. 09 2120. 70 247 .53 0.91 5976094 .14 652853 .29 N 70 .34166145 W 148 .75946985 5393. 55 49 .94 5.79 4451. 28 4516 .21 2147. 54 2177 .97 2154. 22 2139. 73 249 .37 1.52 5976113 .20 652854 .75 N 70 .34171346 W 148 .75945485 5418. 55 50 .26 6.13 4467. 32 4532 .25 2166. 64 2197 .15 2173. 39 2158. 81 251 .37 1.65 5976132 .31 652856 .36 N 70 .34176557 W 148 .75943868 5443. 55 50 .20 6.46 4483. 31 4548 .24 2185. 78 2216 .37 2192. 61 2177. 91 253 .47 1.04 5976151 .45 652858 .07 N 70 .34181775 W 148 .75942158 5468. 55 50 .27 6.67 4499. 30 4564 .23 2204. 94 2235 .58 2211. 83 2197. 00 255 .67 0.70 5976170 .58 652859 .88 N 70 .34186990 W 148 .75940375 5493. 55 .50 .32 6.86 4515. 27 4580 .20 2224. 12 2254 .82 2231. 06 2216. 10 257 .94 0.62 5976189 .72 652861 .76 N 70 .34192208 W 148 .75938536 5518. 55 49 .99 6.98 4531. 29 4596 .22 2243. 26 2274 .01 2250. 25 2235. 15 260 .25 1.37 5976208 .82 652863 .68 N 70 .34197414 W 148 .75936659 5543. 55 50 .31 7.10 4547. 31 4612 .24 2262. 40 2293 .20 2269. 45 2254. 20 262 .60 1.33 5976227 .91 652865 .65 N 70 .34202617 W 148 .75934749 5568. 55 50 .36 7.42 4563. 27 4628 .20 2281. 60 2312 .45 2288. 69 2273. 29 265 .03 1.01 5976247 .04 652867 .69 N 70 .34207833 W 148 .75 75 5593. 55 50 .87 7.81 4579. 13 4644 .06 2300. 89 2331 .77 2308. 01 2292. 44 267 .59 2.37 5976266 .24 652869 .86 N 70 .34213065 W 148 .75 7 5618. 55 51 .05 8.05 4594. 88 4659 .81 2320. 27 2351 .19 2327. 42 2311. 68 270 .27 1.04 5976285 .52 652872 .15 N 70 .34218319 W 148 .759 22 5643. 55 51 .48 8.07 4610. 52 4675 .45 2339. 75 2370 .69 2346. 92 2330. 98 273 .01 1.72 5976304 .88 652874 .49 N 70 .34223594 W 148 .75926303 5668. 55 51 .24 8.05 4626. 13 4691 .06 2359. 25 2390 .22 2366. 44 2350. 32 275 .74 0.96 5976324 .27 652876 .83 N 70 .34228876 W 148 .75924080 5693. 55 51 .12 8.10 4641. 80 4706 .73 2378. 70 2409 .70 2385. 91 2369. 60 278 .48 0.50 5976343 .60 652879 .17 N 70 .34234144 W 148 .75921860 5718. 55 51 .25 8.17 4657. 47 4722 .40 2398. 15 2429 .17 2405. 38 2388. 89 281 .24 0.56 5976362 .94 652881 .54 N 70 :34239412 W 148 .75919622 5743. 55 51 .36 8.30 4673. 10 4738 .03 2417. 63 2448 .69 2424. 89 2408. 20 284 .03 0.60 5976382 .30 652883 .94 N 70 .34244687 W 148 .75917354 5768. 55 51 .42 8.48 4688. 70 4753 .63 2437. 15 2468 .22 2444. 42 2427. 52 286 .88 0.61 5976401 .68 652886 .39 N 70 .34249967 W 148 .75915040 5793. 55 51 .83 8.74 4704. 22 4769 .15 2456. 73 2487 .82 2464. 01 2446. 90 289 .82 1.83 5976421 .11 652888 .93 N 70 .34255261 W 148 .75912658 5818. 55 52 .09 8.88 4719. 63 4784 .56 2476. 40 2507 .51 2483. 68 2466. 36 292 .83 1.13 5976440 .62 652891 .55 N 70 .34260577 W 148 .75910211 5843. 55 52 .28 9.01 4734. 96 4799 .89 2496. 13 2527 .26 2503. 42 2485. 87 295 .90 0.86 5976460 .19 652894 .22 N 70 .34265906 W 148 .75907718 5868. 55 52 .32 9.05 4750. 25 4815 .18 2515. 90 2547 .04 2523. 18 2505. 40 299 .01 0.20 5976479 .78 652896 .93 N 70 .34271243 W 148 .75905198 5893. 55 52 .33 9.09 4765. 53 4830 .46 2535. 68 2566 .83 2542. 96 2524. 94 302 .13 0.13 5976499 .38 652899 .65 N 70 .34276581 W 148 .75902666 5918. 55 52 .32 9.01 4780. 80 4845 .73 2555. 45 2586 .62 2562. 73 2544. 49 305 .24 0.26 5976518 .98 652902 .36 N 70 .34281920 W 148 .75900140 5943. 55 .51 .94 8.98 4796. 15 4861 .08 2575. 17 2606 .35 2582. 45 2563. 98 308 .32 1.52 5976538 .53 652905 .05 N 70 .34287245 W 148 .75897635 5968. 55 51 .91 8.97 4811 :57 4876 .50 2594. 84 2626 .03 2602. 12 2583. 42 311 .39 0.12 5976558 .02 652907 .73 N 70 .34292555 W 148 .75895143 5993. 55 51 .50 8.92 4827. 06 4891 .99 2614. 44 2645 .65 2621. 72 2602. 80 314 .45 1.65 5976577 .46 652910 .38 N 70 .34297850 W 148 .75892667 6018. 55 51 .91 8.88 4842 .55 4907 .48 2634. 05 2665 .27 2641. 33 2622. 18 317 .48 1.64 5976596 .90 652913 .02 N 70 .34303146 W 148 .7 3 'I 6043. 55 52 .01 8.87 4857 .96 4922 .89 2653. 72 2684 .96 2661. 01 2641. 64 320 .52 0.40 5976616 .41 652915 .66 N 70 .34308461 W 148 5 .75 7 6068. 55 51 .69 8.96 4873 .40 4938 .33 2673. 37 2704 .62 2680. 66 2661. 06 323 .57 1.31 5976635 .89 652918 .31 N 70 .34313767 W 148 .75885264 6093. 55 51 .36 9.06 4888 .96 4953 .89 2692. 92 2724 .19 2700. 22 2680. 39 326 .63 1.36 5976655 .28 652920 .98 N 70 .34319047 W 148 .75882776 6118. 55 51 .71 9.05 4904 .51 4969 .44 2712. 49 2743 .77 2719. 78 2699. 72 329 .71 1.40 5976674 .67 652923 .67 N 70 .34324328 W 148 .75880275 6143. 55 51 .84 9.07 4919 .98 4984 .91 2732. 11 2763 .41 2739. 41 2719. 12 332 .80 0.52 5976694 .12 652926 .37 N 70 .34329627 W 148 .75877764 6168. 55 52 .04 9.22 4935 .39 5000 .32 2751. 78 2783 .09 2759. 08 2738. 55 335 .93 0.93 5976713 .61 652929 .10 N 70 .34334936 W 148 .75875225 6193. 55 51 .55 9.36 4950 .85 5015 .78 2771. 42 2802 .74 2778. 71 2757 .94 339 .10 2.01 5976733 .06 652931 .88 N 70 .34340232 W 148 .75872651 6218 .55 51 .96 9.64 4966 .33 5031 .26 2791. 04 2822 .37 2798. 32 2777 .30 342 .34 1.86 5976752 .48 652934 .72 N 70 .34345523 W 148 .75870020 6243 .55 51 .59 9.78 4981 .80 5046 .73 2810. 68 2842 .01 2817. 94 2796 .66 345 .66 1.54 5976771 .90 652937 .64 N 70 .34350811 W 148 .75867331 6268 .55 51 .81 9.76 4997 .29 5062 .22 2830. 29 2861 .63 2837. 54 2815 .99 348 .99 0.88 5976791 .30 652940 .57 N 70 .34356093 W 148 .75864629 6293 .55 51 .79 9.68 5012 .75 5077 .68 2849. 93 2881 .28 2857. 16 2835 .36 352 .30 0.26 5976810 .73 652943 .49 N 70 .34361383 W 148 .75861936 6318.55 51.93 9.69 5028.19 5093.12 2869.59 2900.94 2876.81 2854.74 355.61 0.56 5976830.17 652946.41 N 70.34366678 W 148.75859251 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 5 of 10 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de H00 ft ftUS ftUS tisas .ao a[. ~i a. /Z au4s. a/ a~uu. ou Zzsua .Za ~a~u.ba 6368 .55 52. 34 9. 90 5058. 89 5123. 82 2909 .04 2940.41 6393 .55 52. 17 10. 50 5074. 19 5139. 12 2928 .81 2960.17 6418 .55 51. 82 11. 11 5089. 59 5154. 52 2948 .51 2979.87 6443 .55 52. 14 11. 31 5104. 98 5169. 91 2968 .20 2999.57 6468 .55. 51. 87 11. 21 5120. 37 5185. 30 2987 .90 3019.27 6493 .55 51. 96 11. 15 5135. 79 5200. 72 3007 .58 3038.95 6518 .55 52. 36 11. 13 5151. 13 5216. 06 3027 .32 3058.69 6543 .55 52. 33 11. 16 5166. 40 5231. 33 3047 .12 3078.48 6568 .55 52. 50 11. 16 5181 .65 6593 .55 52. 29 11. 11 5196 .91 6618 .55 52. 58 11. 23 5212 .15 6643 .55 52. 72 11. 36 5227 .32 6668 .55 52. 58 11. 43 5242 .48 6693.55 6718.55 6743.55 6768.55 6793.55 6818.55 6843.55 6868.55 6893.55 6918.55 52.87 52.78 52.56 52.70 52.51 52.67 52.58 52.55 52.54 52.48 11.32 11.28 11.24 11.22 11.29 11.41 11.50 11.48 11.59 11.63 11.67 11.63 11.69 11.71 11.72 11.85 11.88 11.91 11.98 11.92 5257.62 5272.73 5287.89 5303.06 5318.25 5333.43 5348.61 5363.81 5379.01 5394.23 6943.55 6968.55 6993.55 7018.55 7043.55 7068.55 7093.55 7118.55 7143.55 7168.55 7193.55 7218.55 7243.55 7268.55 7293.55 7318.55 7343.55 52.54 52.41 52.46 52.39 52.22 52.36 52.23 52.27 52.27 52.05 52.29 52.03 52.03 52.10 51.84 51.86 51.17 5246.58 5261.84 5277.08 5292.25 5307.41 5322.55 5337.66 5352.82 5367.99 5383.18 5398.36 5413.54 5428.74 5443.94 5459.16 3066.93 3086.73 3106.55 3126.42 3146.30 3166.19 3186.11 3205.99 3225.86 3245.72 3265.58 3285.44 3305.29 3325.14 3344.97 5409.44 5474.37 5424.67 5489.60 5439.91 5504.84 5455.16 5520.09 5470.44 5535.37 5485.73 5550.66 5501.02 5565.95 5516.33 5581.26 5531.63 5596.56 5546.96 5611.89 11.87 5562.30 11.95 5577.63 11.88 5593.01 11.91 5608.38 11.94 5623.79 12.05 5639.23 12.01 5654.79 3364.81 3384.64 3404.45 3424.27 3444.05 3463.82 3483.60 3503.37 3523.14 3542.88 3098.29 3118.10 3137.92 3157.79 3177.66 3197.56 3217.48 3237.36 3257.22 3277.09 3296.94 3316.81 3336.66 3356.51 3376.34 3396.18 3416.01 3435.82 3455.64 3475.42 3495.20 3514.98 3534.74 3554.52 3574.26 ~uan.4a 2916.23 2935.97 2955.63 2975.28 2994.93 3014.56 3034.26 3054.01 3073.77 3093.53 3113.31 3133.14 3152.96 3172.81 3192.68 3212.52 3232.35 3252.17 3271.98 3291.80 3311.61 3331.41 3351.20 3370.99 3390.77 3410.54 3430.30 3450.04 3469.77 3489.50 3509.21 3528.94 3548.63 5627.23 3562.62 3594.01 3568.33 5642.56 3582.36 3613.75 3588.02 5657.94 3602.07 3633.46 3607.69 5673.31 3621.79 3653.17 3627.36 5688.72 3641.48 3672.87 3647.00 Zia/4."1 / 2893.64 2913.09 2932.44 2951.76 2971.08 2990.39 3009.76 3029.18 3048.61 3068.05 3087.49 3106.98 3126.46 3145.96 3165.50 3184.99 3204.48 3223.96 3243.43 3262.90 3282.35 3301.80 3321.23 3340.66 3360.08 3379.48 3398.89 3418.26 3437.62 3456.97 3476.32 3495.66 3514.98 3534.30 3553.62 3572.90 3592.19 3611.46 5704.16 3661.14 3692.53 3666.62 3630.69 5719.72 3680.70 3712.10 3686.14 3649.83 sau.as 362.30 365.80 369.49 373.32 377.17 380.98 384.80 388.62 392.46 396.28 400.12 404.01 407.94 411.86 415.77 419.65 423.52 427.40 431.30 435.25 439.20 443.17 447.16 451.17 455.17 459.18 463.20 467.21 471.25 475.32 479.39 483.49 487.57 491.64 495.72 499.79 503.85 507.92 512.01 516.08 U./s aa/ois4a.oo OAZy4y.33 rv /u.s4s/laaa VV l4ZS./AiSA0A~4 1.08 5976869.19 652952.30 N 70.34377304 W 148.75853821 2.02 5976888.71 652955.41 N 70.34382619 W 148.75850980 2.38 5976908,13 652958.70 N 70.34387905 W 148.75847982 1.43 5976927.53 1.13 5976946.92 0.41 5976966.30 1.60 5976985.74 0.15 5977005.23 0.68 5977024.74 0.85 5977044.25 1.22 5977063.76 0.70 5977083.32 0.60 5977102.88 1.21 5977122.46 0.38 5977142.06 0.89 5977161.63 0.56 5977181.19 0.79 5977200.75 0.74 5977220.29 0.46 5977239.84 0.14 5977259.36 0.35 5977278.88 0.27 5977298.39 0.27 5977317.90 0.54 5977337.39 0.28 5977356.87 0.29 5977376.35 0.68 5977395.80 0.69 5977415.24 0.53 5977434.67 0.19 5977454.09 0.22 5977473.51 0.90 5977492.91 0.97 5977512.30 1.07 5977531.70 0.22 5977551.06 0.30 5977570.43 1.04 5977589.78 0.36 5977609.09 2.76 5977628.30 652962.14 652965.59 652969.01 652972.43 652975.86 652979.30 652982.73 652986.17 652989.66 652993.19 652996.72 653000.22 653003.71 653007.18 653010.66 653014.17 653017.72 653021.27 653024.84 653028.44 653032.05 653035.66 653039.27 653042.89 653046.51 653050.15 653053.82 653057.50 653061.20 653064.90 653068.57 653072.25 653075.93 653079.60 653083.27 653086.97 653090.65 N 70.34393183 W 148.75844874 N 70.34398462 W 148.75841751 N 70.34403735 W 148.75838654 N 70.34409027 W 148.75835558 N 70.34414332 W 148.75832452 N 70.34419642 W 148.75829339 N 70.34424951 W 148.754 N 70.34430262 W 148.75 8 N 70.34435586 W 148.7581 58 N 70.34440908 W 148.75816771 N 70.34446236 W 148.75813586 N 70.34451573 W 148.75810417 N 70.34456899 W 148.75807266 N 70.34462223 W 148.75804125 N 70.34467544 W 148.75800978 N 70.34472863 W 148.75797806 N 70.34478182 W 148.75794603 N 70.34483497 W 148.75791392 N 70.34488809 W 148.75788171 N 70.34494117 W 148.75784930 N 70.34499425 W 148.75781678 N 70.34504730 W 148.75778428 N 70.34510031 W 148.75775176 N 70.34515332 W 148.75771914 N 70.34520623 W 148.7573 N 70.34525913 W 148.757 4 N 70.34531201 W 148.75762073 N 70.34536485 W 148.75758765 N 70.34541769 W 148.75755442 N 70.34547046 W 148.75752124 N 70.34552325 W 148.75748819 N 70.34557602 W 148.75745511 N 70.34562870 W 148.75742208 N 70.34568141 W 148.75738908 N 70.34573405 W 148.75735605 N 70.34578658 W 148.75732288 N 70.34583887 W 148.75728976 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11 /2009 3:16 PM Page 6 of 10 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS Tie-In Survey Top Window (Blind) Base Window (Blind) Inc+Trend MWD+IFR+MS /:S(its.bb b7.tst3 ll.yl 7393.55 51.48 11.92 7418.55 51.37 12.01 7443.55 7468.55 7493.55 7518.55 7543.55 7568.55 7593.55 7618.55 7643.55 7668.55 7693.55 7718.55 7743.55 7768.55 7793.55 7818.55 7843.55 7868.55 7893.55 7918.55 7943.55 7968.55 7993.55 8018.55 8043.55 8068.55 8093.55 8118.55 8143.55 8168.55 51.10 50.92 51.24 51.19 50.75 50.70 50.56 50.93 51.34 51.17 50.93 50.97 50.72 50.85 50.72 50.79 50.71 51.01 51.10 50.54 50.79 50.84 50.64 50.79 50.59 50.73 50.53 50.37 50.28 50.28 12.24 12.15 12.11 12.07 12.12 12.16 12.16 12.10 12.01 12.09 bli / U.34 5685.84 5701.43 5717.08 5732.81 5748.52 5764.18 5779.92 5795.75 5811.61 5827.43 5843.11 5858.76 b/3b.L/ 5750.77 5766.36 5782.01 5797.74 5813.45 5829.11 5844.85 5860.68 5876.54 5892.36 5908.04 5923.69 11.98 5874.48 5939.41 12.04 5890.23 5955.16 12.17 5906.01 5970.94 12.08 5921.82 5986.75 12.06 5937.62 6002.55 12.22 5953.44 6018.37 12.08 5969.26 6034.19 11.94 5985.04 6049.97 12.10 6000.75 6065.68 12.11 6016.54 6081.47 3 /UU.Z / 3719.88 3739.43 3758.92 3778.35 3797.79 3817.28 3836.70 3856.05 3875.37 3894.73 3914.19 3933.69 3953.13 3972.54 3991.92 4011:29 4030.66 4050.01 4069.37 4088.76 4108.20 4127.58 3/31. b/ 3/Ub .bb 3bbtf. ytf bZU. "14 Y.bb by//b4/ A3 3751. 28 3725 .23 3688. 17 524. 19 1.60 5977666. 80 3770. 83 3744 .73 3707. 29 528. 24 0.52 5977685. 99 3790. 32 3764 .18 3726. 35 532. 34 1.30 5977705. 13 3809. 75 3783 .56 3745. 34 536. 44 0.77 5977724. 20 3829. 20 3802 .97 3764. 36 540. 53 1.29 5977743. 29 3848. 69 3822 .41 3783. 41 544. 61 0.24 5977762. 43 3868. 11 3841 .78 3802. 40 548. 68 1.77 5977781. 49 3887.46 3906.79 3926.15 3945.61 3965.11 3984.55 4003.97 4023.36 4042.72 4062.09 4081.46 4100.81 4120.21 4139.65 4159.03 3861.09 3880.37 3899.69 3919.11 3938.57 3957.97 3977.34 3996.69 4016.02 4035.35 4054.67 4073.98 4093.34 4112.74 4132.08 3821.32 3840.21 3859.14 3878.18 3897.25 3916.26 3935.25 3954.21 3973.14 3992.08 4011.01 4029.94 4048.90 4067.92 4086.87 552.75 556.82 560.89 564.95 569.02 0.24 5977800.49 0.56 5977819.46 1.49 5977838.47 1.66 5977857.58 0.72 5977876.73 1.02 5977895.82 0.25 5977914.88 1.08 5977933.92 0.59 5977952.93 0.52 5977971.95 11.97 6032.39 6097.32 4146.91 4178.36 4151.38 4105.78 11.96 6048.19 6113.12 4166.29 4197.74 4170.73 4124.74 12.09 6064.01 6128.94 4185.64 4217.10 4190.05 4143.67 12.01 6079.84 6144.77 4204.99 4236.45 4209.36 4162.59 11.93 6095.68 6160.61 4224.33 4255.79 4228.67 4181.52 12.22 12.05 11.86 11.88 11.93 8193. 55 50 .31 12. 04 8193. 55 50 .31 12. 04 8214. 00 50 .29 11. 91 8231. 00 52 .00 10. 50 8290. 00 56 .75 10. 70 8385. 61 60 .13 11. 05 8479. 77 63 .24 11. 83 8576. 45 65 .83 8. 18 6111.52 6176.45 6127.38 6192.31 6143.30 6208.23 6159.26 6224.19 6175.24 6240.17 6191.21 6256.14 6191.21 6256.14 6204.27 6269.20 6214.94 6279.87 6249.29 6314.22 6299.33 6364.26 6343.98 6408.91 6385.56 6450.49 4243.66 4262.99 4282.26 4301.50 4320.73 4339.96 4339.96 4355.69 4368.93 4416.87 4498.33 4581.21 4668.45 4275.13 4294.45 4313.73 4332.97 4352.20 4371.44 4371.44 4387.17 4400.41 4448.35 4529.81 4612.69 4699.97 4247.97 4200.42 4267.26 4219.32 4286.50 4238.18 4305.71 4257.01 4324.91 4275.82 4344.11 4294.64 4344.11 4294.64 4359.82 4310.03 4373.04 4323.01 4420.96 4370.14 4502.36 4450.13 4585.15 4531.37 4672.39 4617.31 573.08 577.12 581.18 585.25 589.30 593.37 597.45 601.48 605.53 609.60 613.63 617.65 621.68 625.72 629.73 633.78 637.84 641.83 645.79 649.76 653.75 653.75 657.01 659.59 668.41 683.78 700.23 715.36 0.57 5977990.96 0.54 5978009.96 1.28 5978029.00 0.61 5978048.10 2.24 5978067.12 1.09 5978086.11 0.20 5978105.14 0.90 5978124.15 0.65 5978143.15 0.84 5978162.15 1.06 5978181.14 0.96 5978200.11 0.87 5978219.04 0.37 5978237.95 0.15 5978256.84 0.36 5978275.73 0.00 5978275.73 0.50 5978291.18 11.95 5978304.22 8.06 5978351.51 3.55 5978431.79 3.38 5978513.34 4.33 5978599.56 bb3U`J4.3L IV /V.34b8`JllB VV -14b./b/LbOb3 653097.98 N 70.34594360 W 148.75722396 653101.64 N 70.34599584 W 148.75719106 653105.34 N 70.34604790 W 148.75715782 653109.06 N 70.34609979 W 148.75712449 653112.76 N 70.34615174 W 148.75709131 653116.45 N 70.34620379 W 148.75705817 653120.13 N 70.34625567 W 148.75702513 653123.82 N 70.34630736 W 148.75699209 653127.50 N 70.34635897 W 148.75695903 653131.18 N 70.34641068 W 148.7569 600 653134.86 N 70.34646268 W 148.75 0 653138.54 N 70.34651477 W 148.75 5 653142.21 N 70.34656672 W 148.75682703 653145.86 N 70.34661860 W 148.75679423 653149.54 N 70.34667038 W 148.75676122 653153.22 N 70.34672211 W 148.75672819 653156.88 N 70.34677386 W 148.75669530 653160.57 653164.26 653167.91 653171.57 653175.24 653178.89 653182.52 653186.17 653189.82 653193.45 653197.10 653200.78 653204.39 653207.96 653211.55 653215.16 653215.16 653218.11 653220.41 653228.27 N 70.34682557 W 148.75666224 N 70.34687727 W 148.75662916 N 70.34692908 W 148.75659640 N 70.34698104 W 148.75656352 N 70.34703280 W 148.75653052 N 70.34708446 W 148.75649777 N 70.34713625 W 148.75646515 N 70.34718797 W 148.75643240 N 70.34723967 W 148.75639960 N 70.34729136 W 148.75636703 N 70.34734301 W 148.758 N 70.34739463 W 148.75 9 N 70.34744615 W 148.75626877 N 70.34749759 W 148.75623663 N 70.34754899 W 148.75620442 N 70.34760039 W 148.75617199 N 70.34760039 W 148.75617199 N 70.34764244 W 148.75614548 N 70.34767791 W 148.75612460 N 70.34780666 W 148.75605296 653242.01 N 70.34802518 W 148.75592812 653256.80 N 70.34824711 W 148.75579456 653270.18 N 70.34848188 W 148.75567168 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 7 of 10 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DL3 Northing .Fasting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS tft)t)`J. 4L U.S. tSI 3 ./V C4ZV. 13 04yV. U0 4/~L .LI 4/84. U`J 4/00. J`J 4/UU .yO /L9. Vy 9.0/ AYl OOOJ. JU OAJL//. LU IV /U. J90/IVJ~ VV 190. /AaOUV/9 8766. 10 62. 98 358 .05 6468. 45 6533. 38 4837 .22 4870. 52. 4841. 99 4787 .34 725. 42 5.29 5978769. 75 653276. 78 N 70. 34894638 W 148. 75558984 8859. 69 60. 73 351 .52 6512. 63 6577. 56 4916 .34 4953. 02 4922. 10 4869 .45 717. 98 6.60 5978851. 69 653267. 67 N 70. 34917072 W 148. 75565021 8954. 92 58. 16 345 .79 6561. 07 6626. 00 4992 .07 5035. 00 4999. 33 4949 .81 701. 91 5.84 5978931. 70 653249. 97 N 70. 34939025 W 148. 75578057 9049. 88 54. 02 342 .29 6614. 05 6678. 98 5062 .20 5113. 78 5071. 40 5025 .56 680. 31 5.32 5979006. 99 653226. 83 N 70. 34959720 W 148. 75595588 9141. 09 49. 18 337 .20 6670. 71 6735. 64 5123 .21 5185. 22 5134. 64 5092 .60 655. 68 6.87 5979073. 51 653200. 85 N 70. 34978035 W 148. 75615573 9238. 18 45. 93 329. 88 6736. 27 6801. 20 5179 .95 5256. 81 5194. 31 5156 .70 623. 91 6.49 5979136. 94 653167. 78 N 70. 34995548 W 148. 75641359 9331. 99 46. 31 325. 15 6801. 32 6866. 25 5228 .84 5324. 41 5246. 71 5213 .70 587. 61 3.66 5979193. 19 653130. 33 N 70. 35011121 W 148. 75670826 9427. 32 43. 54 324 .78 6868. 81 6933. 74 5275 .44 5391. 73 5297. 34 5268 .82 548. 97 2.92 5979247. 51 653090. 58 N 70. 35026180 W 148. 75702189 9521. 70 43. 99 319 .47 6936. 99 7001. 92 5318 .20 5456. 99 5344. 59 5320 .31 508. 91 3.92 5979298. 16 653049. 48 N 70. 35040246 W 148. 75734706 9615. 28 43. 62 316 .18 7004. 54 7069. 47 5356 .88 5521. 75 5388. 44 5368 .30 465. 43 2.47 5979345. 26 653005. 04 N 70. 35053359 W 148. 7 6 9708. 15 43. 73 311 .08 7071. 73 7136. 66 5391 .28 5585. 86 5428. 72 5412 .52 419. 04 3.79 5979388. 52 652957. 76 N 70. 35065440 W 148. 5 75 4 9804. 42 43. 93 304 .95 7141. 21 7206. 14 5421 .36 5652. 50 5465. 84 5453 .54 366. 57 4.41 5979428. 46 652904. 47 N 70. 35076645 W 148. 75850254 9898. 51 44. 77 299 .14 7208. 52 7273. 45 5444 .77 5718. 24 5497. 18 5488 .38 310. 85 4.41 5979462. 16 652848. 06 N 70. 35086166 W 148. 75895483 9992. 00 46. 87 294 .52 7273. 69 7338. 62 5462 .82 5785. 27 5524. 29 5518 .58 251. 03 4.1 ~ 5979491. 13 652787. 64 N 70. 35094417 W 148. 75944042 10087. 19 46. 88 289 .00 7338. 78 7403. 71 5475 .59 5854. 72 5547. 46 5544 .32 186. 56 4.23 5979515. 55 652722. 66 N 70. 35101448 W 148. 75996385 10182. 22 47. 66 280 .81 7403. 33 7468. 26 5480 .11 5924. 47 5563. 49 5562 .22 119. 20 6.38 5979532. 07 652654. 96 N 70. 35106338 W 148. 76051064 10274. 63 48. 31 274 .07 7465. 22 7530. 15 5475 .64 5993. 09 5571. 31 5571 .08 51. 20 5.46 5979539. 54 652586. 79 N 70. 35108758 W 148. 76106274 10370. 78 47. 00 273 .42 7529. 98 7594. 91 5466 .47 6064. 15 5575. 76 5575 .72 -19. 71 1.45 5979542. 74 652515. 81 N 70. 35110028 W 148. 76163841 10465. 47 46. 19 273 .12 7595. 05 7659. 98 5457 .03 6132. 95 5580. 35 5579 .65 -88. 39 0.89 5979545. 27 652447. 07 N 70. 35111100 W 148. 76219597 10560. 01 44. 84 273 .13 7661. 29 7726. 22 5447 .60 6200. 39 5585 .50 5583 .32 -155. 74 1.43 5979547. 58 652379. 67 N 70. 35112104 W 148. 76274271 10654. 33 43. 47 271 .86 7728. 96 7793. 89 5437 .71 6266. 09 5590 .58 5586 .19 -221. 38 1.73 5979549. 11 652313. 99 N 70. 35112887 W 148. 76327556 10749. 33 43. 08 271 .09 7798. 13 7863. 06 5426 .76 6331. 22 5595 .21 5587 .87 -286. 48 0.69 5979549. 46 652248. 87 N 70. 35113345 W 148. 76380406 10844. 15 42. 52 271 .00 7867. 70 7932. 63 5415 .44 6395. 64 5600 .05 5589 .05 -350. 89 0.59 5979549. 32 652184. 45 N 70. 35113666 W 148. 76432699 10937. 57 42. 45 273 .54 7936. 60 8001. 53 5405 .69 6458. 73 5606 .84 5591 .54 -413. 93 1.84 5979550. 54 652121. 39 N 70. 35114347 W 148. 76483872 11033. 06 42. 16 273 .13 8007. 22 8072. 15 5396 .95 6523. 00 5615 .67 5595 .28 -478. 09 0.42 5979552. 97 652057. 16 N 70. 35115368 W 148. 76535962 11126. 14 42. 17 273 .25 8076. 21 8141. 14 5388 .28 6585. 48 5624 .79 5598 .76 -540. 47 0.09 5979555. 18 651994. 73 N 70. 35116316 W 148 .76586608 11220. 53 41. 62 273 .64 8146. 48 8211 .41 5379 .82 6648. 51 5634 .94 5602 .55 -603. 39 0.64 5979557. 68 651931. 75 N 70. 35117350 W 148 .76 5 11313. 72 43. 92 273 .52 8214. 88 8279 .81 5371 .47 6711. 79 5645 .98 5606 .50 -666. 54 2.47 5979560 .34 651868. 54 N 70. 35118427 W 148 6'8 .76 5 11408. 94 43. 37 274 .42 8283. 78 8348 .71 5363 .24 6777. 51 5658 .60 5611 .04 -732. 10 0.87 5979563 .56 651802. 90 N 70. 35119668 W 148 .76 9 11502. 08 42 .82 274 .21 8351. 80 8416 .73 5355 .66 6841 :14 5671 .90 5615 .83 -795. 56 0.61 5979567 .05 651739. 37 N 70. 35120974 W 148 .76793693 11596. 37 44 .92 274 .08 8419.. 77 8484 .70 5347 .68 6906. 48 5686 .08 5620 .55 -860. 73 2.23 5979570 .45 651674. 12 N 70 .35122262 W 148 .76846601 11691. 87 44 .24 274 .46 8487. 79 8552 .72 5339 .64 6973. 52 5701 .50 5625 .54 -927 .57 0.76 5979574 .07 651607. 19 N 70 .35123623 W 148 .76900869 7" Csg @ 11812' and 11748. 80 44 .20 274 .56 8528. 59 8593 .52 5335 .04 7013. 22 5711 .15 5628 .66 -967 .15 0.14 5979576 .39 651567. 56 N 70 .35124475 W 148 .76933002 Inc+Trend 11813. 23 45 .89 273 .40 8574. 11 8639 .04 5329 .33 7058. 81 5722 .14 5631 .82 -1012 .64 2.92 5979578 .62 651522 .02 N 70 .35125336 W 148 .76969926 11843. 41 54 .93 272 .90 8593. 33 8658 .26 5326 .09 7082 .05 5727 .54 5633 .09 -1035 .84 29.98 5979579 .42 651498 .81 N 70 .35125682 W 148 .76988759 MWD+IFR:AK 11876. 40 65 .45 272 .19 8609. 70 8674 .63 5321 .80 7110 .63 5734 .01 5634 .35 -1064 .39 31.94 5979580 .10 651470 .23 N 70 .35126025 W 148 .77011942 11908. 68 74 .51 270 .10 8620. 74 8685 .67 5316 .51 7140 .93 5740 .29 5634 .94 -1094 .68 28.72 5979580 .07 651439 .94 N 70 .35126185 W 148 .77036533 11939. 00 83 .57 268 .88 8626. 50 8691 .43 5310 .49 7170 .66 5745 .77 5634 .67 -1124 .42 30.14 5979579 .19 651410 .22 N 70 .35126110 W 148 .77060672 11969. 43 91 .03 269 .72 8627 .93 8692 .86 5304 .25 7201 .04 5751 .43 5634 .30 -1154 .79 24.67 5979578 .21 651379 .86 N 70 .35126008 W 148 .77085329 MWD+IFR+MS 11993. 44 91 .16 278 .60 8627 .47 8692 .40 5301 .33 7225 .04 5757 .98 5636 .04 -1178 .71 36.98 5979579 .46 651355 .92 N 70 .35126482 W 148 .77104747 SurveyEditor Ver SP 2.1 Bld(doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 8 of 10 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 1'LULti.14 tty.t3/Lt3S.yU 12056. 80 91 .57 280.10 12088. 68 92 .15 278. 49 12120. 60 91 .26 275. 14 12151. 46 90 .71 274. 94 12183. 81 91 .05 273. 44 12215. 65 91 .46 273. 22 12247. 08 91 .67 274. 62 12278. 39 91 .46 274. 56 12309. 82 91 .12 274. 19 12341. 73 91 .02 274. 06 12373.44 12404.64 12435.57 12467.94 12498.61 12530.75 12562.97 12594.64 12624.68 12656.13 12688.34 12719.41 12751.40 12782.16 12814.10 91.05 91.64 91.40 91.12 91.40 91.60 91.81 91.70 91.46 91.12 91.26 91.12 90.40 90.37 90.33 272.99 271.41 271.72 270.97 270.13 268.46 266.46 264.28 264.96 265.11 265.63 265.19 264.07 265.06 264.39 12845.08 12876.45 12908.34 12939.46 12971.86 13002.99 13035.45 13066.28 13096.88 13128.34 13159.61 13190.42 13222.18 13252.36 13283.91 90.57 90.50 88.00 86.94 87.21 87.25 87.25 88.31 88.58 88.52 88.38 88.31 88.24 88.69 89.78 264.78 265.08 268.56 268.07 267.86 267.87 266.26 265.46 265.05 266.16 tftiL /.1 tf 8626.80 8625.76 8624.81 8624.28 8623.78 8623.09 8622.23 8621.37 8620.66 8620.07 8619.50 8618.76 8617.94 8617.23 8616.56 8615.72 8614.76 8613.79 8612.96 8612.25 8611.58 8610.94 8610.51 8610.31 8610.11 8609.87 8609.57 8609.99 8611.37 8613.02 8614.52 8616.08 8617.27 8618.11 8618.90 tfbyL.l 1 8691.73 8690.69 8689.74 8689.21 8688.71 8688.02 8687.16 8686.30 8685.59 8685.00 8684.43 8683.69 8682.87 8682.16 8681.49 8680.65 8679.69 8678.72 8677.89 8677.18 8676.51 8675.87 8675.44 8675.24 8675.04 8674.80 8674.50 8674.92 8676.30 8677.95 8679.45 8681.01 8682.20 8683.04 8683.83 b:SULStf /Zb/./4 5//U.Cb Db4Z.4Z -lZ1U./b _5301.83 7288.40 5783.45 5648.79 -1240.75 5300.79 7320.26 5795.30 5653.94 -1272.19 5298.38 7352.17 5806.02 5657.72 -1303.86 5295.09 7383.02 5815.64 5660.43 -1334.60 5291.16 7415.37 5825.42 5662.80 -1366.86 5286.82 7447.20 5834.76 5664.65 -1398.64 5282.87 7478.62 5844.43 5666.79 -1429.98 5279.28 7509.92 5854.57 5669.30 -1461.18 5275.57 7541.34 5864.79 5671.70 -1492.51 5271.66 7573.24 5875.18 5673.99 -1524.33 5267.45 7604.95 5885.35 5675.94 -1555.98 5262.59 7636.14 5894.82 5677.14 -1587.14 5257.44 7667.06 5904.03 5677.98 -1618.05 5251.92 7699.42 5913.71 5678.74 -1650.40 5246.28 7730.08 5922.62 5679.04 -1681.07 5239.67 7762.21 5931.44 5678.64 -1713.19 5232.05 7794.42 5939.45 5677.21 -1745.36 5223.43 7826.07 5946.36 5674.66 -1776.91 5214.88 7856.10 5952.68 5671.84 -1806.81 5206.15 7887.54 5959.67 5669.12 -1838.13 5197.39 5188.96 5179.86 5171.07 5162.03 5153.20 5144.43 5136.53 5129.62 5122.24 5115.09 5107.19 5099.06 5090.68 5082.24 7919.75 7950.81 7982.80 8013.56 8045.50 8076.47 8107.84 8139.73 8170.82 8203.18 8234.27 8266.69 8297.50 8328.09 8359.54 5967.18 5974.60 5981.98 5989.19 5996.92 6004.50 6012.51 6021.82 6031.82 6042.19 6052.25 6062.46 6071.70 6080.70 6090.28 265.72 8619.75 8684.68 5074.04 8390.79 6100.13 265.67 8620.64 8685.57 5065.83 8421.59 6109.84 266.40 8621.59 8686.52 5057.54 8453.34 6120:18 265.09 8622.40 8687.33 5049.52 8483.51 6130.00 263.97 8622.82 8687.75 5040.50 8515.05 6139.77 "I b.btS Dy/`JA8A .l8 bbISLS ./4 IV /U .JblLBLLJ VV 146. //l3U//4 13.58 5979590 .94 651293 .63 N 70 .35129962 W 148. 77155114 5.37 5979595 .45 651262 .10 N 70 .35131367 W 148. 77180642 10.85 5979598 .59 651230 .35 N 70 .35132399 W 148. 77206358 1.90 5979600 .67 651199 .57 N 70 .35133138 W 148. 77231310 4.75 5979602 .38 651167 .27 N 70 .35133783 W 148. 77257500 1.46 5979603 .58 651135 .46 N 70 .35134286 W 148. 77283299 4.50 5979605 .09 651104 .09 N 70 .35134871 W 148. 77308745 0.70 5979606 .96 651072 .85 N 70 .35135554 W 148. 77334073 1.60 5979608 .71 651041 .48 N 70 .35136207 W 148. 77359509 0.51 5979610 .36 651009 .62 N 70 .35136832 W 148. 773 3.38 5979611 .67 650977 .94 N 70 .35137363 W 148. 77 3 5.40 5979612 .23 650946 .76 N 70 .35137688 W 148. 77436336 1.27 5979612 .44 650915 .84 N 70 .35137917 W 148. 77461428 2.47 5979612 .54 650883 .48 N 70 .35138123 W 148. 77487694 2.89 5979612 .22 650852 .82 N 70 .35138201 W 148. 77512585 5.23 5979611 .17 650820 .72 N 70 .35138091 W 148. 77538666 6.24 5979609 .08 650788 .58 N 70 .35137700 W 148. 77564784 6.89 5979605 .89 650757 .09 N 70 .35137000 W 148. 77590397 2.40 5979602 .46 650727 .26 N 70 .35136228 W 148. 77614667 1.18 5979599 .11 650696 .00 N 70 .35135483 W 148. 77640097 5666. 52 -1870. 23 1.67 5979595. 85 650663 .97 N 70. 35134771 W 148. 77666154 5664. 04 -1901. 19 1.49 5979592. 74 650633 .06 N 70. 35134089 W 148. 77691291 5661. 04 -1933. 04 4.16 5979589. 10 650601 .29 N 70. 35133269 W 148. 77717144 5658. 13 -1963. 66 3.22 5979585. 56 650570 .73 N 70. 35132471 W 148. 77742003 5655 .19 -1995. 47 2.10 5979581. 98 650539 .00 N 70. 35131667 W 148. 77767822 5652 .27 -2026. 31 1.48 5979578. 43 650508 .23 N 70. 35130866 W 148. 77792858 5649 .50 -2057. 55 0.98 5979575. 02 650477 .05 N 70. 35130106 W 148. 77818224 5647 .73 -2089. 38 13.44 5979572. 61 650445 .26 N 70. 35129621 W 148. 775 5646 .81 -2120. 46 3.75 5979571. 06 650414 .21 N 70. 35129369 W 148. 77 3 5645 .67 -2152. 80 1.06 5979569. 25 650381 .91 N 70. 35129052 W 148. 77895545 5644 .51 -2183. 87 0.13 5979567. 46 650350 .87 N 70. 35128733 W 148. 77920770 5642 .85 -2216. 25 4.95 5979565. 14 650318 .53 N 70. 35128277 W 148. 77947056 5640 .62 -2246. 97 4.31 5979562. 30 650287 .86 N 70. 35127667 W 148. 77972000 5638 .09 -2277. 46 1.60 5979559. 15 650257 .44 N 70. 35126973 W 148. 77996747 5635 .68 -2308. 81 3.53 5979556. 10 650226 .14 N 70. 35126312 W 148. 78022203 5633 .47 -2339. 99 1.48 5979553. 25 650195 .01 N 70. 35125705 W 148. 78047516 5631 .16 -2370. 70 0.28 5979550. 31 650164 .36 N 70. 35125071 W 148. 78072446 5628 .96 -2402. 37 2.31 5979547. 48 650132 .74 N 70. 35124469 W 148. 78098156 5626 .72 -2432. 46 4.59 5979544. 63 650102 .71 N 70. 35123854 W 148. 78122580 5623 .72 -2463. 86 4.95 5979540: 98 650071 .38 N 70. 35123030 W 148. 78148072 SurveyEditor Ver SP 2.1 Bld(doc40x 100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 9 of 10 Comments Neasured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 13315. 73 89. 44 263 .78 8623. 04 13346. 84 90. 13 264 .44 8623. 16 13378. 71 89. 78 263 .60 8623. 18 13409. 88 89. 37 263 .67 8623. 41 13442. 52 90. 64 261 .23 8623. 41 13473. 18 90. 33 261 .55 8623. 15 13503. 31 90. 85 260 .72 8622. 84 13536. 22 92. 01 262 .21 8622. 02 13567. 87 91. 67 261 .33 8621. 00 13599. 48 91. 19 261 .56 8620. 21 13631.23 13662.39 13692.94 13725.75 13757.26 13788.90 13819.32 13851.27 13883.04 259.50 8619.75 259.22 8619.58 259.27 8619.53 258.88 8619.59 259.49 8619.75 90.47 90.16 90.02 89.78 89.65 89.37 89.03 88.62 88.72 8687.97 5031.04 8546.87 6149.43 8688.09 5021.92 8577.98 6159.14 8688.11 5012.53 8609.85 6169.19 8688.34 5003.14 8641.02 6178.96 8688.34 4992.67 8673.66 6188.71 8688.08 4982.30 8704.32 6197.46 8687.77 4971.99 8734.45 6206.07 8686.95 4960.90 8767.35 6215.80 8685.93 4950.40 8798.98 6225.47 8685.14 4939.74 8830.58 6235.10 8684.68 4928.55 8862.33 6244.44 8684.51 4916.98 8893.49 6253.15 8684.46 4905.58 8924.04 6261.76 8684.52 4893.24 8956.85 6271.07 8684.68 4881.45 8988.36 6280.22 258.67 8620.02 8684.95 4869.56 9019.99 6289.49 257.68 8620.44 8685.37 4857.68 9050.41 6298.09 258.43 8621.10 8686.03 4845.15 9082.36 6307.19 259.76 8621.84 8686.77 4833.22 9114.12 6316.94 5620. 32 -2495. 50 1.22 5979536. 94 650039. 82 N 70. 35122100 W 148 .78173756 5617. 13 -2526. 44 3.07 5979533. 12 650008. 94 N 70. 35121225 W 148 .78198877 5613. 81 -2558. 14 2.86 5979529. 16 649977. 33 N 70: 35120315 W 148 .78224608 5610. 35 -2589. 12 1.33 5979525. 07 649946. 43 N 70. 35119368 W 148 .78249755 5606. 07 -2621. 47 8.43 5979520. 13 649914. 17 N 70. 35118193 W 148 .78276020 5601. 48 -2651. 78 1.45 5979514. 92 649883. 96 N 70. 35116937 W 148 .78300628 5596. 83 -2681. 55 3.25 5979509. 67 649854. 29 N 70. 35115665 W 148 .78324793 5591. 95 -2714. 09 5.74 5979504. 13 649821. 87 N 70. 35114328 W 148 .78351204 5587. 42 -2745. 39 2.98 5979498. 96 649790. 66 N 70. 35113088 W 148 .78376619 5582. 72 -2776. 64 1.68 5979493. 63 649759. 52 N 70. 35111801 W 148 .78401985 5577. 50 -2807. 95 6.87 5979487. 77 649728. 32 N 70. 35110371 W 148 .784 5571. 74 -2838. 58 1.34 5979481. 40 649697. 82 N 70. 35108796 W 148 .78 63 5566. 04 -2868. 59 0.49 5979475. 09 649667. 93 N 70. 35107235 W 148 .78476627 5559. 83 -2900. 81 1.40 5979468. 21 649635. 85 N 70. 35105533 W 148 .78502778 5553. 91 -2931. 76 1.98 5979461. 67 649605. 03 N 70. 35103915 W 148 .78527902 5547. 92 -2962. 82 2.74 5979455. 05 649574. 10 N 70. 35102274 W 148 .78553120 5541. 69 -2992. 59 3.44 5979448. 21 649544. 46 N 70. 35100568 W 148 .78577287 5535. 08 -3023. 84 2.67 5979440. 97 649513. 35 N 70. 35098758 W 148 .78602655 5529. 07 -3055. 03 4.20 5979434. 32 649482. 30 N 70. 35097113 W 148 .78627972 Last Survey 13926.34 89.65 261.88 8622.45 8687.38 4818.17 9157.41 6331.70 5522.16 -3097.77 5.35 5979426.55 649439.71 N 70.35095222 W 148.78662665 TD (Projected) 13980.00 89.65 261.88 8622.78 8687.71 4800.45 9211.07 6351.28 5514.58 -3150.89 0.00 5979417.89 649386.76 N 70.35093145 W 148.78705787 Survey Type: Definitive Survey NOTES: GYD CT CMS - (Gyrodata -cont. casing m/s -- Gyrodata multishot surveys with continuous toll (RGS-CT) in casing. OD 73-3/8" or less. ) INC+Trend - (Inclinometer + known azi trend --Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant" model. ) MWD +IFR : AK - (MWD +IFR [Alaska] -- In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) MWD +IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy.) • Legal Descriation: Northing IYI IftUSI Easting IXI fftUSl Surtace : 2434 FSL 2192 FEL S2 T11 N R13E UM 5973969.00 652649.00 BHL : 2669 FSL 58 FEL S34 T12N R13E UM 5979417.89 649386.76 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-19\F-19\F-19A\F-19A Generated 3/11/2009 3:16 PM Page 10 of 10 TREE= FMC 4 1 /16" WELLHEAD = ACTUATOR = KB. ELEV = 24.95 BF. ELEV = 27 KOP = 8214' and Max Angle = 92.17 Datum MD = Datum ND = 8800 L ~~~~_~ F-19A I I Min ID = 3.725" @ 11633' MD 4-1 /2" XN NIPPLE 7" Scab Liner Top Packer 4317' 7" Intermediate Liner Top Packer $07$' 9 5/8" Top of Whipstock 8214' KoP 8214' 9 5/8" EZSV 8235' Top of 4 1/2" TBG Cut -- 9250' P&A TOC 11299' 9 5/8" x 4 1 /2" PKR, ID = 4.0" 11299' S NOTES: 2192' ~-X41/2" HES X NIP, ID = 3.813" 2725' 13 3/8" CSG, 72lf, L-80, ID = 12.347" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 3 4105 3696 51 KBG2 DCK BEK 0 02/16!09 2 8115 6206 50 KBG2 DMY BK 0 02116!09 1 10620 7769 44 KBG2 DMY BK 0 02/16(09 11497' ~ 4-1 /2" HES X NIP, ~ = 3.813" 17"X4-112" BKR S-3 PKR 1 1 11560' H 41/2" HES X NIP, ID = 3.813" 11633' --i4-1/2" HES XN NIP, ID= 3.725" 11639' 4-1/2" PBR '11646' Bottom of WLEG 11668' ~--Hanger/Liner top packer TOP OF 7" LNR ~-~ 1162$' 9 518" CSG, 47#, L-80, ID = 8.681" ~~ 12117' PBTD 12900' 7" LNR, 26#, L-80 IJ4S, ID = 6.276" 12949' ' 11812' 7" CSG, 26# L-80, .0383 bpf, ID = 6.276" ' PERFORATION SUMMARY ' REF LOG: ???? ON ????? ANGLE AT TOP PERF: 54 @ 11839' Note: Refer to Production DB for historical pert data ' SIZE SPF INTERVAL Opn/Sqz DATE SLTD 11839 - 13935 O 02715/09 13978' 4.5", 12.6#, L-80, IBT Nl, Slotted Liner DATE REV BY COMMENTS DATE REV BY COMMENTS 10/08(81 SUSPENDED 02/24/09 TLHiTLH CORRECTIONS 02/12/85 N18E ORIGINAL COMPLETION 12(17/94 N2ES RWO 02/17/09 N7ES SIDETRACK (F-19A) 10/21/07 CAZ/PJC DRAWING CORRECTIONS _.a. ~ ._ PRUDHOE BAY UNff WELL: F-19A PERMfI- No: 208-173 API No: 50-029-20629-01 SEC 2, T11 N, R13E, 2845' SNL & 2192' WEL BP Exploration (Alaska) a. ^J SCHLUMBERGER Survey report 14-Feb-2009 09:20:43 Page 1 of 14 Client ...................: BPXA Field ....................: Prudhoe Bay Well .....................: F-19A API number ...............: 50-029-20629-01 Engineer .................: E. Galotta/A. Ruhl COUNTY :..................: NSB STATE :...................: AK ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: --------------- MEAN SEA LEVEL Driller's Depth 36.22 ft N/A ft 64.93 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 270.00 degrees [(c)2009 IDEAL ID13_OC_14] Spud date ................: 01-FEB-09 Last survey date.........: 14-Feb-09 Total accepted surveys...: 370 MD of first survey.......: 0.00 ft MD of last survey........: 13980.00 ft ----- Geomagnetic data --- Magnetic model...........: Magnetic date ............: Magnetic field strength..: Magnetic dec (+E/W-).....: Magnetic dip .............: ------------------ BGGM version 2008 07-Feb-2009 57699.71 LAMA 22.83 degrees 80.93 degrees ----- MWD survey Reference Criteria --------- Reference G ..............: 1002.68 meal Reference H ..............: 57699.50 LAMA Reference Dip ............: 80.93 degrees Tolerance of G...........: (+/-) 2.50 meal Tolerance of H...........: (+/-)300.00 LAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------- ------ Magnetic dec (+E/W-).....: 22.83 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 22.83 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 14-Feb- 2009 09:20:43 Page 2 of 14 --- ___ Seq ________ Measured ______ Incl _______ Azimuth ______ Course ________ TVD ____---- Vertical --------- Displ ------- Displ -- ---- Total --- At DLS Srvy Too l # depth angle angle length depth section +N/S- +E/W- dis 1 p Azim (de / g tool Cor r - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) ___ (ft) ______ (deg) 100f) type (d eg) ___ 1 ________ 0.00 ______ 0.00 _______ 0.00 ______ 0.00 ________ 0.00 ________ 0.00 _________ 0.00 ____ 0.00 0.00 0.00 0.00 BP_ UNKN OWN 2 26.00 0.00 0.00 26.00 26.00 0.00 0.00 0.00 0.00 0.00 0.00 BP_ UNKN OWN 3 93.55 0.15 309.08 67.55 93.55 0.07 0.06 -0.07 0.09 309.08 0.22 BP_ GYD CT CMS 4 193.55 0.33 172.40 100.00 193.55 0.13 -0.15 -0.13 0.20 221.92 0.45 BP_ GYD CT CMS 5 293.55 0.41 220.38 100.00 293.55 0.33 -0.71 -0.33 0.78 204.80 0.31 BP_ GYD CT CMS 6 393.55 0.53 196.71 100.00 393.54 0.69 -1.42 -0.69 1.58 205.93 0.23 BP_ GYD CT CMS 7 493 55 0.56 184.31 100.00 493.54 0.86 -2.35 -0.86 2.50 200.10 0.12 BP_ GYD CT CMS 8 . 593.55 0.36 168.08 100.00 593.54 0.83 -3.15 -0.83 3.25 194.82 0.24 BP_ GYD CT CMS 9 693.55 0.24 164.54 100.00 693.53 0.71 -3.65 -0.71 3.72 191.02 0.12 BP_ GYD CT CMS 10 793.55 0.50 172.34 100.00 793.53 0.60 -4.29 -0.60 4.33 187.93 0.26 BP_ GYD CT CMS 11 893.55 0.14 137.65 100.00 893.53 0.46 -4.81 -0.46 4.83 185.43 0.39 BP_ GYD CT CMS 12 993.55 0.12 120.57 100.00 993.53 0.28 -4.96 -0.28 4.96 183.29 0.04 BP_ GYD CT CM5 13 1093.55 0.37 166.68 100.00 1093.53 0.12 -5.32 -0.12 5.32 181.29 0.30 BP_ GYD CT CMS 14 1193.55 0.07 196.39 100.00 1193.53 0.06 -5.70 -0.06 5.70 180.63 0.31 BP_ GYD CT CMS 15 1293.55 0.10 222.61 100.00 1293.53 0.14 -5.82 -0.14 5.82 181.37 0.05 BP_ GYD CT CMS 16 1393.55 0.81 8.93 100.00 1393.53 0.09 -5.18 -0.09 5.19 180.98 0.89 BP _GYD CT CMS 17 1493.55 3.69 17.65 100.00 1493.44 -1.00 -1.42 1.00 1.73 144.91 2.89 BP _GYD CT CMS 18 1593.55 4.96 13.42 100.00 1593.15 -2.98 5.85 2.98 6.57 26.95 1.31 BP _GYD CT CMS 19 1693.55 5.12 14.53 100.00 1692.77 -5.10 14.38 5.10 15.25 19.53 0.19 BP _GYD CT CMS 20 1793.55 5.85 23.17 100.00 1792.31 -8.22 23.38 8.22 24.79 19.38 1.10 BP _GYD CT CMS 21 1893.55 8.32 42.96 100.00 1891.55 -15.16 33.36 15.16 36.65 24.44 3.44 BP _GYD CT CMS 22 1993.55 9.12 43.69 100.00 1990.40 -25.57 44.39 25.57 51.23 29.94 0.81 BP _GYD CT CMS 23 2093.55 10.45 36.58 100.00 2088.94 -36.45 57.40 36.45 68.00 32.41 1.79 BP _GYD CT CMS 24 2193.55 11.91 21.74 100.00 2187.06 -45.68 74.28 45.68 87.20 31.59 3.21 BP _GYD CT CMS 25 2293.55 14.25 15.49 100.00 2284.47 -52.79 95.73 52.79 109.32 28.87 2.73 BP _GYD CT CMS 26 2318.55 15.03 14.03 25.00 2308.65 -54.39 101.84 54.39 115.45 28.11 3.45 BP _GYD CT CMS 27 2343.55 15.71 12.67 25.00 2332.76 -55.92 108.28 55.92 121.87 27.31 3.08 BP _GYD CT CMS 28 2368.55 16.00 12.44 25.00 2356.81 -57.41 114.95 57.41 128.49 26.54 1.19 BP _GYD CT CM5 29 2393.55 16.47 12.09 25.00 2380.81 -58.89 121.78 58.89 135.27 25.81 1.92 BP _GYD CT CMS 30 2418.55 16.88 12.15 25.00 2404.76 -60.40 128.79 60.40 142.25 25.12 1.64 BP _GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 3 of 14 5eq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) -------- ------ --- 31 2443.55 17.35 11.86 25.00 32 2468.55 17.95 11.72 25.00 33 2493.55 18.46 11.52 25.00 34 2518.55 19.16 11.40 25.00 35 2543.55 19.77 11.23 25.00 36 2568.55 20.65 10.93 25.00 37 2593.55 21.38 10.67 25.00 38 2618.55 21.77 10.58 25.00 39 2643.55 22.25 10.34 25.00 40 2668.55 22.50 10.34 25.00 41 2693.55 22.74 10.34 25.00 42 2718.55 23.35 10.23. 25.00 43 2743.55 23.69 10.26 25.00 44 2768.55 24.15 10.19 25.00 45 2793.55 25.09 9.91 25.00 46 2818.55 26.53 9.04 25.00 47 2843.55 27.56 8.73 25.00 48 2868.55 28.24 8.62 25.00 49 2893.55 29.35 8.56 25.00 50 2918.55 30.15 8.74 25.00 51 2943.55 30.66 8.90 25.00 52 2968.55 31.18 9.29 25.00 53 2993.55 31.73 9.79 25.00 54 3018.55 32.34 10.33 25.00 55 3043.55 33.03 10.16 25.00 56 3068.55 34.35 8.70 25.00 57 3093.55 35.48 7.67 25.00 58 3118.55 36.14 7.30 25.00 59 3143.55 36.76 6.60 25.00 60 3168.55 37.56 5.64 25.00 TVD depth (ft) 2428.65 2452.48 2476.22 2499.89 2523.46 2546.92 2570.26 2593.51 2616.68 2639.80 2662.88 2685.88 2708.81 2731.66 2754.39 2776.89 2799.16 2821.25 2843.16 2864.86 2886.43 2907.87 2929.20 2950.39 2971.43 2992.24 3012.74 3033.01 3053.12 3073.04 Vertical section (ft) -61.93 -63.48 -65.05 -66.65 -68.28 -69.94 -71.62 -73.32 -75.02 -76.73 -78.45 -80.20 -81.97 -83.77 -85.59 -87.38 -89.14 -90.90 -92.70 -94.56 -96.50 -98.54 -100.70 -103.02 -105.42 -107.68 -109.72 -111.63 -113.42 -115.03 Displ Displ Total +N/S- +E/W- displ (ft) (ft) (ft) 135.99 61.93 149.43 143.41 63.48 156.83 151.06 65.05 164.47 158.96 66.65 172.37 167.13 68.28 180.54 175.60 69.94 189.02 184.41 71.62 197.83 193.45 73.32 206.87 202.66 75.02 216.10 212.02 76.73 225.48 221.48 78.45 234.97 231.11 80.20 244.63 240.93 81.97 254.49 250.90 83.77 264.52 261.16 85.59 274.83 271.89 87.38 285.59 283.13 89.14 296.83 294.69 90.90 308.39 306.60 92.70 320.30 318.86 94.56 332.59 331.36 96.50 345.13 344.05 98.54 357.88 356.91 100.70 370.85 369.97 103.01 384.04 383.26 105.42 397.49 396.93 107.68 411.28 411.10 109.72 425.49 425.60 111.63 440.00 440.34 113.42 454.72 455.36 115.03 469.66 At Azim (deg) 24.48 23.87 23.30 22.75 22.22 21.72 21.23 20.76 20.31 19.89 19.51 19.14 18.79 18.46 18.15 17.82 17.48 17.14 16.82 16.52 16.24 15.98 15.76 15.56 15.38 15.18 14.94 14.70 14.44 14.18 DLS Srvy Tool (deg/ tool Corr 100f) type (deg) ----- ----- ------ 1.91 BP_GYD CT CMS 2.41 BP_GYD CT CMS 2.06 BP_GYD CT CMS 2.80 BP_GYD CT CMS 2.45 BP_GYD CT CMS 3.54 BP_GYD CT CMS 2.94 BP_GYD CT CMS 1.57 BP_GYD CT CMS 1.95 BP_GYD CT CMS 1.00 BP_GYD CT CMS 0.96 BP_GYD CT CMS 2.45 BP_GYD CT CMS 1.36 BP_GYD CT CMS 1.84 BP_GYD CT CMS 3.79 BP_GYD CT CM5 5.96 BP_GYD CT CMS 4.16 BP_GYD CT CMS 2.73 BP_GYD CT CMS 4.44 BP_GYD CT CMS 3.22 BP_GYD CT CMS 2.07 BP_GYD CT CMS 2.23 BP_GYD CT CMS 2.43 BP_GYD CT CMS 2.70 BP_GYD CT CMS 2.78 BP_GYD CT CMS • 6.19 BP_GYD CT CMS 5.10 BP_GYD CT CMS 2.78 BP_GYD CT CMS 2.99 BP_GYD CT CMS 3.95 BP_GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 4 of 14 ___ Seq ________ Measured ______ Incl _______ Azimuth ______ Course ________ TVD ____---- Vertical -------- Displ -------- Displ ------- Total ------- At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) ---- (ft) - (deg) 100f) type (deg) ___ 61 ________ 3193.55 ------ 38.88 ------- ----- - 4.92 ------ 25.00 -------- 3092.68 -------- -116.45 -------- 470.76 ---- 116.45 484.95 13.89 5.57 BP_ GYD CT CMS 62 3218.55 39.62 4.62 25.00 3112.04 -117.77 486.52 117.77 500.57 13.61 3.06 BP_ GYD CT CMS 63 3243.55 40.61 4.29 25.00 3131.16 -119.02 502.58 119.02 516.48 13.32 4.05 BP_ GYD CT CMS 64 3268.55 41.35 4.23 25.00 3150.03 -120.24 518.93 120.24 532.68 13.05 2.96 BP_ GYD CT CMS 65 3293.55 42.10 4.24 25.00 3168.69 -121.46 535.52 121.46 549.13 12.78 3.00 BP_ GYD CT CMS 66 3318.55 42.85 4.22 25.00 3187.13 -122.71 552.36 122.71 565.83 12.53 3.00 BP_ GYD CT CMS 67 3343.55 43.54 4.21 25.00 3205.36 -123.97 569.43 123.97 582.76 12.28 2.76 BP_ GYD CT CMS 68 3368.55 44.24 4.24 25.00 3223.37 -125.24 586.71 125.24 599.93 12.05 2.80 BP_ GYD CT CMS 69 3393.55 44.98 4.21 25.00 3241.17 -126.54 604.22 126.54 617.33 11.83 2.96 BP_ GYD CT CMS 70 3418.55 45.86 4.25 25.00 3258.72 -127.85 621.98 127.85 634.98 11.62 3.52 BP_ GYD CT CMS 71 3443.55 46.57 4.27 25.00 3276.02 -129.19 639.98 129.19 652.89 11.41 2.84 BP _GYD CT CMS 72 3468.55 47.27 4.28 25.00 3293.09 -130.55 658.19 130.55 671.01 11.22 2.80 BP _GYD CT CMS 73 3493.55 48.07 4.36 25.00 3309.93 -131.95 676.61 131.95 689.36 11.03 3.21 BP _GYD CT CMS 74 3518.55 48.70 4.40 25.00 3326.53 -133.37 695.25 133.37 707.93 10.86 2.52 BP _GYD CT CMS 75 3543.55 49.29 4.40 25.00 3342.93 -134.82 714.06 134.82 726.68 10.69 2.36 BP _GYD CT CMS 76 3568.55 49.87 4.39 25.00 3359.14 -136.28 733.04 136.28 745.60 10.53 2.32 BP _GYD CT CMS 77 3593.55 50.51 4.42 25.00 3375.15 -137.75 752.19 137.75 764.70 10.38 2.56 BP _GYD CT CMS 78 3618.55 51.02 4.41 25.00 3390.96 -139.24 771.49 139.24 783.96 10.23 2.04 BP _GYD CT CMS 79 3643.55 51.36 4.42 25.00 3406.63 -140.74 790.91 140.74 803.34 10.09 1.36 BP _GYD CT CMS 80 3668.55 51.15 4.49 25.00 3422.28 -142.26 810.35 142.26 822.75 9.96 0.87 BP _GYD CT CMS 81 3693.55 51.17 4.50 25.00 3437.96 -143.79 829.77 143.78 842.13 9.83 0.09 BP _GYD CT CMS 82 3718.55 51.24 4.52 25.00 3453.62 -145.32 849.19 145.32 861.53 9.71 0.29 BP _GYD CT CMS 83 3743.55 51.10 4.53 25.00 3469.29 -146.85 868.61 146.85 880.93 9.60 0.56 BP _GYD CT CMS 84 3768.55 51.33 4.52 25.00 3484.95 -148.39 888.03 148.39 900.35 9.49 0.92 BP _GYD CT CMS 85 3793.55 51.18 4.49 25.00 3500.60 -149.92 907.47 149.92 919.77 9.38 0.61 BP _GYD CT CM5 86 3818.55 51.21 4.49 25.00 3516.27 -151.45 926.89 151.45 939.18 9.28 0.12 BP _GYD CT CMS • 87 3843.55 51.25 4.48 25.00 3531.92 -152.97 946.32 152.97 958.61 9.18 0.16 BP _GYD CT CMS 88 3868.55 51.17 4.55 25.00 3547.58 -154.51 965.75 154.51 978.03 9.09 0.39 BP _GYD CT CMS 89 3893.55 51.29 4.58 25.00 3563.24 -156.06 985.18 156.06 997.46 9.00 0.49 BP _GYD CT CMS 90 3918.55 51.04 4.62 25.00 3578.92 -157.62 1004.59 157.62 1016.88 8.92 1.01 BP _GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb- 2009 09:20:43 Page 5 of 14 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ ------- Total ----- At DLS S rvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ t ool Cor r - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) t ype (deg) 91 3943.55 51.14 4.68 25.00 3594.62 -159.20 1023.98 159.20 1036.28 8.84 0.44 BP_ GYD CT CMS 92 3968.55 51.12 4.68 25.00 3610.31 -160.78 1043.38 160.78 1055.70 8.76 0.08 BP_ GYD CT CMS 93 3993.55 51.03 4.69 25.00 3626.02 -162.37 1062.76 162.37 1075.10 8.69 0.36 BP_ GYD CT CMS 94 4018.55 51.09 4.70 25.00 3641.73 -163.96 1082.14 163.96 1094.50 8.62 0.24 BP_ GYD CT CMS 95 4043.55 51.05 4.70 25.00 3657.44 -165.56 1101.53 165.56 1113.90 8.55 0.16 BP_ GYD CT CMS 96 4068.55 50.95 4.67 25.00 3673.17 -167.14 1120.89 167.14 1133.28 8.48 0.41 BP_ GYD CT CMS 97 4093.55 51.14 4.66 25.00 3688.89 -168.73 1140.27 168.73 1152.68 8.42 0.76 BP_ GYD CT CMS 98 4118.55 50.98 4.63 25.00 3704.60 -170.30 1159.65 170.30 1172.09 8.35 0.65 BP_ GYD CT CM5 99 4143.55 51.08 4.64 25.00 3720.32 -171.87 1179.02 171.87 1191.48 8.29 0.40 BP_ GYD CT CMS 100 4168.55 51.05 4.59 25.00 3736.03 -173.44 1198.40 173.44 1210.89 8.23 0.20 BP_ GYD CT CMS 101 4193.55 50.93 4.65 25.00 3751.77 -175.00 1217.77 175.00 1230.28 8.18 0.51 BP_ GYD CT CMS 102 4218.55 51.15 4.60 25.00 3767.49 -176.57 1237.14 176.57 1249.68 8.12 0.89 BP_ GYD CT CMS 103 4243.55 51.02 4.65 25.00 3783.19 -178.14 1256.53 178.14 1269.10 8.07 0.54 BP_ GYD CT CMS 104 4268.55 51.11 4.62 25.00 3798.90 -179.71 1275.92 179.71 1288.51 8.02 0.37 BP_ GYD CT CMS 105 4293.55 50.97 4.63 25.00 3814.62 -181.28 1295.29 181.28 1307.92 7.97 0.56 BP_ GYD CT CMS 106 4318.55 50.41 4.60 25.00 3830.46 -182.83 1314.57 182.83 1327.23 7.92 2.24 BP_ GYD CT CMS 107 4343.55 50.67 4.62 25.00 3846.35 -184.38 1333.81 184.38 1346.50 7.87 1.04 BP_ GYD CT CMS 108 4368.55 51.04 4.63 25.00 3862.13 -185.95 1353.14 185.95 1365.85 7.82 1.48 BP_ GYD CT CMS 109 4393.55 51.18 4.57 25.00 3877.83 -187.51 1372.53 187.51 1385.28 7.78 0.59 BP_ GYD CT CMS 110 4418.55 51.06 4.58 25.00 3893.52 -189.06 1391.93 189.06 1404.71 7.73 0.48 BP_ GYD CT CMS 111 4443.55 50.97 4.55 25.00 3909.25 -190.61 1411.30 190.61 1424.12 7.69 0.37 BP_ GYD CT CMS 112 4468.55 50.64 4.49 25.00 3925.05 -192.13 1430.62 192.13 1443.46 7.65 1.33 BP_ GYD CT CM5 113 4493.55 50.65 4.46 25.00 3940.90 -193.64 1449.89 193.64 1462.76 7.61 0.10 BP_ GYD CT CMS 114 4518.55 50.63 4.46 25.00 3956.76 -195.14 1469.16 195.14 1482.06 7.57 0.08 BP_ GYD CT CMS 115 4543.55 50.65 4.49 25.00 3972.61 -196.65 1488.43 196.65 1501.37 7.53 0.12 BP_ GYD CT CM5 116 4568.55 50.65 4.51 25.00 3988.46 -198.17 1507.70 198.17 1520.67 7.49 0.06 BP_ GYD CT CMS . 117 4593.55 50.52 4.45 25.00 4004.33 -199.68 1526.96 199.68 1539.96 7.45 0.55 BP_ GYD CT CMS 118 4618.55 50.37 4.49 25.00 4020.26 -201.18 1546.18 201.18 1559.21 7.41 0.61 BP _GYD CT CMS 119 4643.55 50.45 4.50 25.00 4036.19 -202.69 1565.38 202.69 1578.45 7.38 0.32 BP _GYD CT CMS 120 4668.55 50.44 4.53 25.00 4052.11 -204.21 1584.60 204.21 1597.70 7.34 0.10 BP _GYD CT CMS ((c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 6 of 14 --- --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ ------ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) ___ 121 ____---- 4693.55 ------ 50.63 ------- 4.50 ------ 25.00 -------- 4068.00 -------- -205.73 ------- 1603.84 205.73 1616.98 7.31 0.77 BP_ GYD CT CMS 122 4718.55 50.89 4.56 25.00 4083.81 -207.26 1623.14 207.26 1636.32 7.28 1.06 BP_ GYD CT CMS 123 4743.55 50.52 4.54 25.00 4099.65 -208.79 1642.43 208.79 1655.64 7.24 1.48 BP_ GYD CT CMS 124 4768.55 50.38 4.56 25.00 4115.56 -210.32 1661.64 210.32 1674.90 7.21 0.56 BP_ GYD CT CMS 125 4793.55 50.46 4.51 25.00 4131.49 -211.84 1680.85 211.84 1694.15 7.18 0.36 BP_ GYD CT CMS 126 4818.55 50.20 4.49 25.00 4147.45 -213.35 1700.03 213.35 1713.37 7.15 1.04 BP_ GYD CT CMS 127 4843.55 50.40 4.44 25.00 4163.42 -214.85 1719.21 214.85 1732.58 7.12 0.81 BP_ GYD CT CMS 128 4868.55 50.37 4.43 25.00 4179.36 -216.34 1738.41 216.34 1751.82 7.09 0.12 BP_ GYD CT CMS 129 4893.55 50.17 4.45 25.00 4195.34 -217.83 1757.58 217.83 1771.03 7.07 0.80 BP_ GYD CT CMS 130 4918.55 50.48 4.42 25.00 4211.30 -219.32 1776.77 219.32 1790.25 7.04 1.24 BP_ GYD CT CMS 131 4943.55 50.09 4.48 25.00 4227.28 -220.81 1795.94 220.81 1809.46 7.01 1.57 BP _GYD CT CMS 132 4968.55 50.36 4.44 25.00 4243.27 -222.30 1815.09 222.30 1828.66 6.98 1.09 BP _GYD CT CMS 133 4993.55 50.46 4.45 25.00 4259.20 -223.80 1834.30 223.80 1847.90 6.96 0.40 BP _GYD CT CMS 134 5018.55 50.31 4.50 25.00 4275.14 -225.30 1853.50 225.30 1867.14 6.93 0.62 BP _GYD CT CMS 135 5043.55 50.24 4.56 25.00 4291.12 -226.82 1872.67 226.82 1886.36 6.91 0.34 BP _GYD CT CMS 136 5068.55 49.98 4.62 25.00 4307.15 -228.35 1891.79 228.35 1905.52 6.88 1.06 BP _GYD CT CMS 137 5093.55 50.20 4.71 25.00 4323.19 -229.91 1910.90 229.91 1924.68 6.86 0.92 BP _GYD CT CMS 138 5118.55 50.14 4.67 25.00 4339.20 -231.48 1930.04 231.48 1943.87 6.84 0.27 BP _GYD CT CMS 139 5143.55 49.90 4.71 25.00 4355.27 -233.05 1949.13 233.05 1963.01 6.82 0.97 BP _GYD CT CMS 140 5168.55 50.19 4.71 25.00 4371.32 -234.62 1968.23 234.62 1982.16 6.80 1.16 BP _GYD CT CMS 141 5193.55 50.13 4.68 25.00 4387.34 -236.19 1987.36 236.19 2001.35 6.78 0.26 BP _GYD CT CMS 142 5218.55 50.10 4.71 25.00 4403.37 -237.76 2006.48 237.76 2020.52 6.76 0.15 BP _GYD CT CMS 143 5243.55 49.84 4.74 25.00 4419.45 -239.34 2025.56 239.34 2039.65 6.74 1.04 BP _GYD CT CMS 144 5268.55 49.75 4.84 25.00 4435.59 -240.93 2044.58 240.93 2058.73 6.72 0.47 BP _GYD CT CMS 145 5293.55 49.99 4.84 25.00 4451.70 -242.55 2063.63 242.55 2077.84 6.70 0.96 BP _GYD CT CMS 146 5318.55 49.50 4.87 25.00 4467.86 -244.16 2082.64 244.16 2096.90 6.69 1.96 BP _GYD CT CMS 147 5343.55 49.96 5.02 25.00 4484.02 -245.81 2101.65 245.81 2115.97 6.67 1.90 BP _GYD CT CMS 148 5368.55 49.88 5.30 25.00 4500.11 -247.53 2120.70 247.53 2135.09 6.66 0.91 BP _GYD CT CMS 149 5393.55 49.94 5.79 25.00 4516.21 -249.38 2139.73 249.37 2154.22 6.65 1.52 BP _GYD CT CMS 150 5418.55 50.26 6.13 25.00 4532.25 -251.37 2158.81 251.37 2173.39 6.64 1.65 BP _GYD CT CMS ((c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb- 2009 09:20:43 Page 7 of 14 ___ Seq ________ Measured ______ Incl Azimuth ______ Course ________ TVD Vertical -------- Displ -------- Displ ------- Total ------- At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ t ool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) __ (ft) _______ (deg) __ 100f) type (deg) ___ 151 ________ 5443.55 ______ 50.20 _______ 6.46 ______ 25.00 ________ 4548.24 ________ -253.47 ________ 2177.91 ______ 253.47 2192.61 6.64 1.04 BP_ GYD CT CMS 152 5468.55 50.27 6.67 25.00 4564.23 -255.67 2197.00 255.67 2211.82 6.64 0.70 BP_ GYD CT CMS 153 5493.55 50.32 6.86 25.00 4580.20 -257.94 2216.10 257.94 2231.06 6.64 0.62 BP_ GYD CT CMS 154 5518.55 49.99 6.98 25.00 4596.22 -260.25 2235.15 260.25 2250.25 6.64 1.37 BP_ GYD CT CMS 155 5543.55 50.31 7.10 25.00 4612.24 -262.60 2254.20 262.60 2269.45 6.64 1.33 BP_ GYD CT CMS 156 5568.55 50.36 7.42 25.00 4628.20 -265.03 2273.29 265.03 2288.69 6.65 1.01 BP_ GYD CT CMS 157 5593.55 50.87 7.81 25.00 4644.06 -267.59 2292.44 267.59 2308.01 6.66 2.37 BP_ GYD CT CMS 158 5618.55 51.05 8.05 25.00 4659.81 -270.27 2311.68 270.27 2327.42 6.67 1.04 BP_ GYD CT CMS 159 5643.55 51.48 8.07 25.00 4675.45 -273.01 2330.98 273.01 2346.92 6.68 1.72 BP_ GYD CT CMS 160 5668.55 51.24 8.05 25.00 4691.06 -275.75 2350.32 275.74 2366.44 6.69 0.96 BP_ GYD CT CMS 161 5693.55 51.12 8.10 25.00 4706.73 -278.48 2369.60 278.48 2385.91 6.70 0.50 BP_ GYD CT CMS 162 5718.55 51.25 8.17 25.00 4722.40 -281.24 2388.89 281.24 2405.38 6.71 0.56 BP_ GYD CT CMS 163 5743.55 51.36 8.30 25.00 4738.03 -284.03 2408.20 284.03 2424.89 6.73 0.60 BP_ GYD CT CMS 164 5768.55 51.42 8.48 25.00 4753.63 -286.88 2427.52 286.88 2444.42 6.74 0.61 BP_ GYD CT CMS 165 5793.55 51.83 8.74 25.00 4769.15 -289.82 2446.90 289.82 2464.00 6.75 1.83 BP_ GYD CT CMS 166 5818.55 52.09 8.88 25.00 4784.56 -292.83 2466.36 292.83 2483.68 6.77 1.13 BP_ GYD CT CMS 167 5843.55 52.28 9.01 25.00 4799.88 -295.90 2485.87 295.90 2503.42 6.79 0.86 BP_ GYD CT CMS 168 5868.55 52.32 9.05 25.00 4815.17 -299.01 2505.40 299.01 2523.18 6.81 0.20 BP_ GYD CT CMS 169 5893.55 52.33 9.09 25.00 4830.45 -302.13 2524.94 302.13 2542.95 6.82 0.13 BP_ GYD CT CMS 170 5918.55 52.32 9.01 25.00 4845.73 -305.24 2544.48 305.24 2562.73 6.84 0.26 BP_ GYD CT CM5 171 5943.55 51.94 8.98 25.00 4861.08 -308.33 2563.98 308.32 2582.45 6.86 1.52 BP_ GYD CT CMS 172 5968.55 51.91 8.97 25.00 4876.50 -311.40 2583.42 311.39 2602.12 6.87 0.12 BP_ GYD CT CMS 173 5993.55 51.50 8.92 25.00 4891.99 -314.45 2602.80 314.45 2621.72 6.89 1.65 BP _GYD CT CMS 174 6018.55 51.91 8.88 25.00 4907.48 -317.48 2622.18 317.48 2641.33 6.90 1.64 BP _GYD CT CMS 175 6043.55 52.01 8.87 25.00 4922.89 -320.52 2641.64 320.52 2661.01 6.92 0.40 BP _GYD CT CMS 176 6068.55 51.69 8.96 25.00 4938.33 -323.57 2661.06 323.57 2680.66 6.93 1.31 BP _GYD CT CMS 177 6093.55 51.36 9.06 25.00 4953.88 -326.63 2680.39 326.63 2700.22 6.95 1.36 BP _GYD CT CMS 178 6118.55 51.71 9.05 25.00 4969.44 -329.71 2699.72 329.71 2719.78 6.96 1.40 BP _GYD CT CMS 179 6143.55 51.84 9.07 25.00 4984.90 -332.80 2719.11 332.80 2739.41 6.98 0.52 BP _GYD CT CMS 180 6168.55 52.04 9.22 25.00 5000.32 -335.93 2738.55 335.93 2759.08 6.99 0.93 BP _GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 8 of 14 ___ Seq ________ Measured ______ Incl _______ Azimuth ______ Course ________ TVD ________ Vertical ________ Displ ________ Displ _______ Total ________ At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 6193.55 51.55 9.36 25.00 5015.78 -339.10 2757.94 339.10 2778.71 7.01 2.01 BP_ GYD CT CMS 182 6218.55 51.96 9.64 25.00 5031.25 -342.35 2777.30 342.34 2798.32 7.03 1.86 BP_ GYD CT CMS 183 6243.55 51.59 9.78 25.00 5046.72 -345.66 2796.66 345.66 2817.94 7.05 1.54 BP_ GYD CT CMS 184 6268.55 51.81 9.76 25.00 5062.22 -348.99 2815.99 348.99 2837.54 7.06 0.88 BP_ GYD CT CMS 185 6293.55 51.79 9.68 25.00 5077.68 -352.30 2835.36 352.30 2857.16 7.08 0.26 BP_ GYD CT CMS 186 6318.55 51.93 9.69 25.00 5093.12 -355.61 2854.74 355.61 2876.80 7.10 0.56 BP_ GYD CT CMS 187 6343.55 52.11 9.72 25.00 5108.50 -358.93 2874.16 358.93 2896.49 7.12 0.73 BP_ GYD CT CMS 188 6368.55 52.34 9.90 25.00 5123.82 -362.30 2893.64 362.30 2916.23 7.14 1.08 BP_ GYD CT CMS • 189 6393.55 52.17 10.50 25.00 5139.12 -365.80 2913.09 365.80 2935.97 7.16 2.02 BP_ GYD CT CMS 190 6418.55 51.82 11.11 25.00 5154.51 -369.49 2932.44 369.49 2955.63 7.18 2.38 BP_ GYD CT CMS 191 6443.55 52.14 11.31 25.00 5169.91 -373.32 2951.76 373.32 2975.28 7.21 1.43 BP_ GYD CT CMS 192 6468.55 51.87 11.21 25.00 5185.30 -377.17 2971.08 377.17 2994.93 7.23 1.13 BP_ GYD CT CMS 193 6493.55 51.96 11.15 25.00 5200.72 -380.99 2990.39 380.98 3014.56 7.26 0.41 BP_ GYD CT CMS 194 6518.55 52.36 11.13 25.00 5216.06 -384.80 3009.76 384.80 3034.26 7.29 1.60 BP_ GYD CT CMS 195 6543.55 52.33 11.16 25.00 5231.33 -388.63 3029.18 388.62 3054.00 7.31 0.15 BP_ GYD CT CMS 196 6568.55 52.50 11.16 25.00 5246.58 -392.46 3048.61 392.46 3073.77 7.34 0.68 BP_ GYD CT CMS 197 6593.55 52.29 11.11 25.00 5261.83 -396.28 3068.05 396.28 3093.53 7.36 0.85 BP_ GYD CT CMS 198 6618.55 52.58 11.23 25.00 5277.08 -400.12 3087.49 400.12 3113.31 7.38 1.22 BP _GYD CT CMS 199 6643.55 52.72 11.36 25.00 5292.24 -404.02 3106.98 404.01 3133.14 7.41 0.70 BP _GYD CT CMS 200 6668.55 52.58 11.43 25.00 5307.41 -407.94 3126.46 407.94 3152.96 7.43 0.60 BP _GYD CT CMS 201 6693.55 52.87 11.32 25.00 5322.55 -411.87 3145.96 411.86 3172.81 7.46 1.21 BP _GYD CT CMS 202 6718.55 52.78 11.28 25.00 5337.66 -415.77 3165.50 415.77 3192.68 7.48 0.38 BP _GYD CT CMS 203 6743.55 52.56 11.24 25.00 5352.82 -419.65 3184.99 419.65 3212.52 7.51 0.89 BP _GYD CT CMS 204 6768.55 52.70 11.22 25.00 5367.99 -423.52 3204.48 423.52 3232.35 7.53 0.56 BP _GYD CT CMS 205 6793.55 52.51 11.29 25.00 5383.17 -427.40 3223.96 427.40 3252.17 7.55 0.79 BP _GYD CT CMS 206 6818.55 52.67 11.41 25.00 5398.36 -431.30 3243.43 431.30 3271.98 7.57 0.74 BP _GYD CT CMS 207 6843.55 52.58 11.50 25.00 5413.54 -435.25 3262.90 435.25 3291.80 7.60 0.46 BP _GYD CT CMS 208 6868.55 52.55 11.48 25.00 5428.73 -439.20 3282.35 439.20 3311.61 7.62 0.14 BP _GYD CT CMS 209 6893.55 52.54 11.59 25.00 5443.94 -443.17 3301.80 443.17 3331.41 7.64 0.35 BP _GYD CT CMS 210 6918.55 52.48 11.63 25.00 5459.15 -447.17 3321.23 447.16 3351.20 7.67 0.27 BP _GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb- 2009 09:20:43 Page 9 of 14 --- Seq Measured -- Incl Azimuth Course TVD ------ Vertical Dis 1 P Dis 1 p Total At DLS S rvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ t ool Cor r - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) t ype (deg) 211 6943.55 52.54 11.67 25.00 5474.37 -451.17 3340.66 451.17 3370.98 7.69 0.27 BP_ GYD CT CMS 212 6968.55 52.41 11.63 25.00 5489.60 -455.17 3360.08 455.17 3390.77 7.71 0.54 BP_ GYD CT CMS 213 6993.55 52.46 11.69 25.00 5504.84 -459.18 3379.48 459.18 3410.54 7.74 0.28 BP_ GYD CT CMS 214 7018.55 52.39 11.71 25.00 5520.08 -463.20 3398.89 463.20 3430.30 7.76 0.29 BP_ GYD CT CMS 215 7043.55 52.22 11.72 25.00 5535.37 -467.21 3418.25 467.21 3450.04 7.78 0.68 BP_ GYD CT CM5 216 7068.55 52.36 11.85 25.00 5550.66 -471.25 3437.62 471.25 3469.77 7.81 0.69 BP_ GYD CT CMS 217 7093.55 52.23 11.88 25.00 5565.95 -475.32 3456.97 475.32 3489.50 7.83 0.53 BP_ GYD CT CMS 218 7118.55 52.27 11.91 25.00 5581.26 -479.40 3476.32 479.39 3509.21 7.85 0.19 BP_ GYD CT CMS • 219 7143.55 52.27 11.98 25.00 5596.56 -483.49 3495.66 483.49 3528.94 7.87 0.22 BP_ GYD CT CMS 220 7168.55 52.05 11.92 25.00 5611.89 -487.58 3514.98 487.57 3548.63 7.90 0.90 BP_ GYD CT CMS 221 7193.55 52.29 11.87 25.00 5627.22 -491.65 3534.30 491.64 3568.33 7.92 0.97 BP_ GYD CT CMS 222 7218.55 52.03 11.95 25.00 5642.56 -495.72 3553.61 495.72 3588.02 7.94 1.07 BP_ GYD CT CMS 223 7243.55 52.03 11.88 25.00 5657.94 -499.79 3572.90 499.79 3607.69 7.96 0.22 BP_ GYD CT CMS 224 7268.55 52.10 11.91 25.00 5673.31 -503.85 3592.19 503.85 3627.36 7.98 0.30 BP_ GYD CT CMS 225 7293.55 51.84 11.94 25.00 5688.71 -507.92 3611.46 507.92 3647.00 8.01 1.04 BP_ GYD CT CMS 226 7318.55 51.86 12.05 25.00 5704.16 -512.01 3630.69 512.01 3666.62 8.03 0.36 BP_ GYD CT CMS 227 7343.55 51.17 12.01 25.00 5719.71 -516.09 3649.83 516.09 3686.14 8.05 2.76 BP_ GYD CT CMS 228 7368.55 51.88 11.91 25.00 5735.27 -520.14 3668.98 520.14 3705.66 8.07 2.86 BP_ GYD CT CMS 229 7393.55 51.48 11.92 25.00 5750.77 -524.19 3688.17 524.19 3725.23 8.09 1.60 BP_ GYD CT CMS 230 7418.55 51.37 12.01 25.00 5766.36 -528.24 3707.29 528.24 3744.73 8.11 0.52 BP_ GYD CT CMS 231 7443.55 51.10 12.24 25.00 5782.01 -532.34 3726.35 532.34 3764.18 8.13 1.30 BP_ GYD CT CMS 232 7468.55 50.92 12.15 25.00 5797.74 -536.44 3745.34 536.44 3783.56 8.15 0.77 BP_ GYD CT CMS 233 7493.55 51.24 12.11 25.00 5813.45 -540.53 3764.36 540.53 3802.97 8.17 1.29 BP_ GYD CT CMS 234 7518.55 51.19 12.07 25.00 5829.11 -544.61 3783.41 544.61 3822.41 8.19 0.24 BP_ GYD CT CMS 235 7543.55 50.75 12.12 25.00 5844.85 -548.68 3802.40 548.68 3841.78 8.21 1.77 BP_ GYD CT CMS 236 7568.55 50.70 12.16 25.00 5860.68 -552.75 3821.32 552.75 3861.09 8.23 0.24 BP_ GYD CT CMS • 237 7593.55 50.56 12.16 25.00 5876.53 -556.82 3840.21 556.82 3880.37 8.25 0.56 BP _GYD CT CMS 238 7618.55 50.93 12.10 25.00 5892.35 -560.89 3859.14 560.89 3899.69 8.27 1.49 BP _GYD CT CMS 239 7643.55 51.34 12.01 25.00 5908.04 -564.96 3878.18 564.95 3919.11 8.29 1.66 BP _GYD CT CMS 240 7668.55 51.17 12.09 25.00 5923.69 -569.03 3897.25 569.02 3938.57 8.31 0.72 BP _GYD CT CMS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb- 2009 09:20:43 Page 10 of 14 --- Seq -------- Measured ------ ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ ---- Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 7693.55 50.93 11.98 25.00 5939.40 -573.08 3916.26 573.08 3957.97 8.33 1.02 BP_ GYD CT CMS 242 7718.55 50.97 12.04 25.00 5955.15 -577.12 3935.25 577.12 3977.34 8.34 0.25 BP_ GYD CT CMS 243 7743.55 50.72 12.17 25.00 5970.94 -581.18 3954.21 581.18 3996.69 8.36 1.08 BP_ GYD CT CMS 244 7768.55 50.85 12.08 25.00 5986.74 -585.25 3973.14 585.25 4016.02 8.38 0.59 BP_ GYD CT CMS 245 7793.55 50.72 12.06 25.00 6002.55 -589.30 3992.08 589.30 4035.35 8.40 0.52 BP_ GYD CT CMS 246 7818.55 50.79 12.22 25.00 6018.37 -593.38 4011.01 593.37 4054.67 8.42 0.57 BP_ GYD CT CMS 247 7843.55 50.71 12.08 25.00 6034.18 -597.45 4029.94 597.45 4073.98 8.43 0.54 BP_ GYD CT CMS 248 7868.55 51.01 11.94 25.00 6049.96 -601.48 4048.90 601.48 4093.34 8.45 1.28 BP_ GYD CT CMS • 249 7893.55 51.10 12.10 25.00 6065.68 -605.53 4067.92 605.53 4112.74 8.47 0.61 BP_ GYD CT CMS 250 7918.55 50.54 12.11 25.00 6081.47 -609.60 4086.87 609.60 4132.08 8.48 2.24 BP_ GYD CT CMS 251 7943.55 50.79 11.97 25.00 6097.32 -613.63 4105.78 613.63 4151.38 8.50 1.09 BP_ GYD CT CMS 252 7968.55 50.84 11.96 25.00 6113.11 -617.65 4124.74 617.65 4170.72 8.52 0.20 BP_ GYD CT CMS 253 7993.55 50.64 12.09 25.00 6128.94 -621.68 4143.67 621.68 4190.05 8.53 0.90 BP_ GYD CT CMS 254 8018.55 50.79 12.01 25.00 6144.76 -625.72 4162.59 625.72 4209.36 8.55 0.65 BP_ GYD CT CMS 255 8043.55 50.59 11.93 25.00 6160.60 -629.73 4181.52 629.73 4228.67 8.56 0.84 BP_ GYD CT CM5 256 8068.55 50.73 12.22 25.00 6176.45 -633.78 4200.42 633.78 4247.97 8.58 1.06 BP_ GYD CT CMS 257 8093.55 50.53 12.05 25.00 6192.31 -637.84 4219.32 637.84 4267.26 8.60 0.96 BP_ GYD CT CMS 258 8118.55 50.37 11.86 25.00 6208.23 -641.83 4238.18 641.83 4286.50 8.61 0.87 BP _GYD CT CMS 259 8143.55 50.28 11.88 25.00 6224.19 -645.79 4257.01 645.79 4305.71 8.63 0.37 BP _GYD CT CMS 260 8168.55 50.28 11.93 25.00 6240.16 -649.76 4275.82 649.76 4324.91 8.64 0.15 BP _GYD CT CMS 261 8193.55 50.31 12.04 25.00 6256.14 -653.75 4294.64 653.75 4344.11 8.66 0.36 BP _GYD CT CMS 262 8214.00 50.29 11.91 20.45 6269.20 -657.02 4310.03 657.01 4359.82 8.67 0.50 BP _BLIND 263 8231.00 52.00 10.50 17.00 6279.86 -659.59 4323.01 659.59 4373.04 8.68 11.95 BP _BLIND 264 8290.00 56.75 10.70 59.00 6314.22 -668.41 4370.14 668.41 4420.96 8.70 8.06 BP _INC+TREND 265 8385.61 60.13 11.05 95.61 6364.25 -683.78 4450.13 683.78 4502.36 8.74 3.55 BP _INC+TREND 266 8479.77 63.24 11.83 94.16 6408.91 -700.23 4531.37 700.23 4585.15 8.78 3.38 BP _MWD+IFR+MS 267 8576.45 65.83 8.18 96.68 6450.49 -715.36 4617.31 715.36 4672.39 8.81 4.33 BP _MWD+IFR+MS 268 8669.42 63.81 3.70 92.97 6490.06 -724.09 4700.95 724.09 4756.39 8.76 4.87 BP _MWD+IFR+MS 269 8766.10 62.98 358.05 96.68 6533.38 -725.42 4787.34 725.42 4841.99 8.62 5.29 BP _MWD+IFR+MS 270 8859.69 60.73 351.52 93.59 6577.56 -717.98 4869.45 717.98 4922.10 8.39 6.60 BP _MWD+IFR+MS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report Seq Measured # depth - (ft) 271 8954.92 272 9049.88 273 9141.09 274 9238.18 275 9331.99 276 9427.32 277 9521.70 278 9615.28 279 9708.15 280 9804.42 281 9898.51 282 9992.00 283 10087.19 284 10182.22 285 10274.63 286 10370.78 287 10465.47 288 10560.01 289 10654.33 290 10749.33 291 10844.15 292 10937.57 293 11033.06 294 11126.14 295 11220.53 296 11313.72 297 11408.94 298 11502.08 299 11596.37 300 11691.87 Incl angle (deg) 58.16 54.02 49.18 45.93 46.31 43.54 43.99 43.62 43.73 43.93 Azimuth Course angle length (deg) (ft) 345.79 95.23 342.29 94.96 337.20 91.21 329.88 97.09 325.15 93.81 324.78 95.33 319.47 94.38 316.18 93.58 311.08 92.87 304.95 96.27 44.77 299.14 46.87 294.52 46.88 289.00 47.66 280.81 48.31 274.07 47.00 273.42 46.19 273.12 44.84 273.13 43.47 271.86 43.08 271.09 42.52 271.00 42.45 273.54 42.16 273.13 42.17 273.25 41.62 273.64 43.92 273.52 43.37 274.42 42.82 274.21 44.92 274.08 44.24 274.46 94.09 93.49 95.19 95.03 92.41 96.15 94.69 94.54 94.32 95.00 94.82 93.42 95.49 93.08 94.39 93.19 95.22 93.14 94.29 95.50 14-Feb-2009 09:20:43 Page 11 of 14 TVD Vertical Displ depth section +N/S- (ft) (ft) (ft) -------- -------- 6626.00 -701.91 4949.81 6678.98 -680.31 5025.56 6735.64 -655.68 5092.60 6801.20 -623.91 5156.70 6866.25 -587.61 5213.70 6933.74 -548.97 5268.82 7001.92 -508.91 5320.31 7069.46 -465.44 5368.30 7136.66 -419.05 5412.52 7206.14 -366.57 5453.54 7273.45 -310.85 5488.38 7338.62 -251.04 5518.58 7403.71 -186.56 5544.32 7468.25 -119.21 5562.22 7530.15 -51.20 5571.08 7594.91 19.71 5575.72 7659.98 88.39 5579.65 7726.22 155.74 5583.32 7793.89 221.37 5586.19 7863.06 286.47 5587.87 7932.63 350.89 5589.05 8001.53 413.92 5591.54 8072.15 478.09 5595.28 8141.14 540.47 5598.76 8211.40 603.39 5602.55 8279.81 666.54 5606.50 8348.71 732.10 5611.04 8416.73 795.56 5615.83 8484.70 860.73 5620.56 8552.72 927.57 5625.54 Displ Total +E/W- displ (ft) (ft) 701.91 4999.33 680.31 5071.40 655.68 5134.64 623.91 5194.31 587.61 5246.71 548.97 5297.34 508.91 5344.59 465.43 5388.44 419.04 5428.72 366.57 5465.84 310.85 5497.18 251.03 5524.29 186.56 5547.46 119.20 5563.49 51.20 5571.31 -19.71 5575.76 -88.39 5580.35 -155.74 5585.50 -221.38 5590.58 -286.48 5595.21 -350.89 5600.05 -413.93 5606.84 -478.09 5615.67 -540.47 5624.79 -603.39 5634.95 -666.54 5645.98 -732.10 5658.60 -795.56 5671.90 -860.73 5686.08 -927.57 5701.50 At Azim (deg) 8.07 7.71 7.34 6.90 6.43 5.95 5.46 4.96 4.43 3.85 3.24 2.60 1.93 1.23 0.53 359.80 359.09 358.40 357.73 357.07 356.41 355.77 355.12 354.49 353.85 353.22 352.57 351.94 351.29 350.64 ----- ----- ------ DLS Srvy Tool (deg/ tool Corr 100f) type (deg) ----- ----- ------ 5.84 BP_MWD+IFR+MS 5.32 BP_MWD+IFR+MS 6.87 BP_MWD+IFR+MS 6.49 BP_MWD+IFR+MS 3.66 BP MWD+IFR+MS 2.92 BP_MWD+IFR+MS 3.92 BP MWD+IFR+MS 2.47 BP_MWD+IFR+MS 3.79 BP_MWD+IFR+M5 4.41 BP_MWD+IFR+MS 4.41 BP_MWD+IFR+MS 4.19 BP_MWD+IFR+MS 4.23 BP_MWD+IFR+MS 6.38 BP_MWD+IFR+MS 5.46 BP MWD+IFR+MS 1.45 BP_MWD+IFR+MS 0.89 BP MWD+IFR+MS 1.43 BP_MWD+IFR+MS 1.73 BP MWD+IFR+MS 0.69 BP MWD+IFR+MS 0.59 BP_MWD+IFR+MS 1.84 BP_MWD+IFR+MS 0.42 BP_MWD+IFR+MS 0.09 BP_MWD+IFR+MS 0.64 BP MWD+IFR+MS 2.47 BP_MWD+IFR+MS 0.87 BP MWD+IFR+MS 0.61 BP_MWD+IFR+MS 2.23 BP_MWD+IFR+MS 0.76 BP MWD+IFR+MS r L_J [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 12 of 14 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -----p- Dis 1 -------p Dis 1 Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 301 11748.80 44.20 274.56 56.93 8593.52 967.15 5628.67 -967.15 5711.15 350.25 0.14 BP_MWD+IFR+MS 302 11813.23 45.89 273.40 64.43 8639.04 1012.63 5631.82 -1012.64 5722.14 349.81 2.92 BP_INC+TREND 303 11843.41 54.93 272.90 30.18 8658.25 1035.83 5633.09 -1035.84 5727.54 349.58 29.98 BP_INC+TREND 304 11876.40 65.45 272.19 32.99 8674.63 1064.39 5634.35 -1064.39 5734.01 349.30 31.94 BP_MWD+IFR 305 11908.68 74.51 270.10 32.28 8685.67 1094.68 5634.94 -1094.68 5740.29 349.01 28.72 BP_MWD+IFR 306 11939.00 83.57 268.88 30.32 8691.43 1124.41 5634.67 -1124.42 5745.77 348.71 30.14 BP_MWD+IFR 307 11969.43 91.03 269.72 30.43 8692.86 1154.79 5634.30 -1154.79 5751.43 348.42 24.67 BP_MWD+IFR 308 11993.44 91.16 278.60 24.01 8692.40 1178.70 5636.04 -1178.71 5757.98 348.19 36.98 BP_MWD+IFR+MS 309 12026.14 89.87 283.90 32.70 8692.11 1210.76 5642.42 -1210.76 5770.86 347.89 16.68 BP_MWD+IFR+MS • 310 12056.80 91.57 280.10 30.66 8691.72 1240.74 5648.79 -1240.75 5783.45 347.61 13.58 BP_MWD+IFR+MS 311 12088.68 92.15 278.49 31.88 8690.69 1272.19 5653.94 -1272.19 5795.30 347.32 5.37 BP_MWD+IFR+MS 312 12120.60 91.26 275.14 31.92 8689.74 1303.86 5657.73 -1303.86 5806.02 347.02 10.85 BP_MWD+IFR+MS 313 12151.46 90.71 274.94 30.86 8689.21 1334.60 5660.44 -1334.60 5815.64 346.73 1.90 BP_MWD+IFR+MS 314 12183.81 91.05 273.44 32.35 8688.71 1366.86 5662.80 -1366.86 5825.43 346.43 4.75 BP_MWD+IFR+MS 315 12215.65 91.46 273.22 31.84 8688.01 1398.64 5664.65 -1398.64 5834.76 346.13 1.46 BP_MWD+IFR+MS 316 12247.08 91.67 274.62 31.43 8687.15. 1429.98 5666.80 -1429.98 5844.44 345.84 4.50 BP_MWD+IFR+MS 317 12278.39 91.46 274.56 31.31 8686.30 1461.18 5669.30 -1461.18 5854.57 345.55 0.70 BP_MWD+IFR+MS 318 12309.82 91.12 274.19 31.43 8685.59 1492.51 5671.70 -1492.51 5864.79 345.26 1.60 BP_MWD+IFR+MS 319 12341.73 91.02 274.06 31.91 8685.00 1524.33 5673.99 -1524.33 5875.18 344.96 0.51 BP_MWD+IFR+MS 320 12373.44 91.05 272.99 31.71 8684.42 1555.97 5675.94 -1555.98 5885.35 344.67 3.38 BP_MWD+IFR+MS 321 12404.64 91.64 271.41 31.20 8683.69 1587.14 5677.14 -1587.14 5894.82 344.38 5.40 BP_MWD+IFR+MS 322 12435.57 91.40 271.72 30.93 8682.87 1618.05 5677.98 -1618.05 5904.03 344.09 1.27 BP_MWD+IFR+MS 323 12467.94 91.12 270.97 32.37 8682.16 1650.40 5678.74 -1650.40 5913.71 343.79 2.47 BP_MWD+IFR+MS 324 12498.61 91.40 270.13 30.67 8681.48 1681.06 5679.04 -1681.07 5922.62 343.51 2.89 BP_MWD+IFR+MS 325 12530.75 91.60 268.46 32.14 8680.64 1713.19 5678.64 -1713.19 5931.44 343.21 5.23 BP_MWD+IFR+MS 326 12562.97 91.81 266.46 32.22 8679.68 1745.36 5677.21 -1745.36 5939.45 342.91 6.24 BP_MWD+IFR+MS . 327 12594.64 91.70 264.28 31.67 8678.71 1776.91 5674.66 -1776.91 5946.36 342.61 6.89 BP_MWD+IFR+MS 328 12624.68 91.46 264.96 30.04 8677.88 1806.81 5671.84 -1806.81 5952.68 342.33 2.40 BP_MWD+IFR+MS 329 12656.13 91.12 265.11 31.45 8677.18 1838.13 5669.12 -1838.13 5959.67 342.04 1.18 BP_MWD+IFR+MS 330 12688.34 91.26 265.63 32.21 8676.51 1870.23 5666.52 -1870.23 5967.18 341.73 1.67 BP_MWD+IFR+MS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 13 of 14 Seq Measured # depth - (ft) 331 12719.41 332 12751.40 333 12782.16 334 12814.10 335 12845.08 336 12876.45 337 12908.34 338 12939.46 339 12971.86 340 13002.99 341 13035.45 342 13066.28 343 13096.88 344 13128.34 345 13159.61 346 13190.42 347 13222.18 348 13252.36 349 13283.91 350 13315.73 351 13346.84 352 13378.71 353 13409.88 354 13442.52 355 13473.18 356 13503.31 357 13536.22 358 13567.87 359 13599.48 360 13631.23 Incl angle (deg) 91.12 90.40 90.37 90.33 90.57 90.50 88.00 86.94 87.21 87.25 87.25 88.31 88.58 88.52 88.38 88.31 88.24 88.69 89.78 89.44 90.13 89.78 89.37 90.64 90.33 90.85 92.01 91.67 91.19 90.47 Azimuth Course angle length (deg) (ft) 265.19 31.07 264.07 31.99 265.06 30.76 264.39 31.94 264.78 30.98 265.08 31.37 268.56 31.89 268.07 31.12 267.86 32.40 267.87 31.13 266.26 32.46 265.46 30.83 265.05 30.60 266.16 31.46 265.72 31.27 265.67 30.81 266.40 31.76 265.09 30.18 263.97 31.55 263.78 31.82 264.44 31.11 263.60 31.87 263.67 31.17 261.23 32.64 261.55 30.66 260.72 30.13 262.21 32.91 261.33 31.65 261.56 31.61 259.50 31.75 TVD depth (ft) 8675.86 8675.44 8675.23 8675.03 8674.79 8674.50 8674.92 8676.29 8677.94 8679.45 8681.01 8682.20 8683.03 8683.83 8684.67 8685.56 8686.52 8687.33 8687.75 8687.96 8688.08 8688.11 8688.34 8688.33 8688.08 8687.76 8686.94 8685.93 8685.14 8684.68 Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (ft) -------- ---------------- ------ 1901.19 5664.04 -1901.19 5974.60 1933.04 5661.04 -1933.04 5981.98 1963.66 5658.13 -1963.66 5989.19 1995.46 5655.19 -1995.46 5996.92 2026.30 5652.27 -2026.31 6004.50 2057.55 5649.50 -2057.55 6012.52 2089.38 5647.73 -2089.38 6021.82 2120.46 5646.82 -2120.46 6031.82 2152.79 5645.67 -2152.80 6042.19 2183.86 5644.51 -2183.87 6052.25 2216.24 5642.85 -2216.25 6062.47 2246.97 5640.62 -2246.97 6071.70 2277.45 5638.09 -2277.46 6080.70 2308.81 5635.68 -2308.81 6090.28 2339.99 5633.47 -2339.99 6100.13 2370.70 5631.16 -2370.70 6109.84 2402.37 5628.96 -2402.37 6120.18 2432.46 5626.73 -2432.46 6130.00 2463.86 5623.72 -2463.86 6139.77 2495.50 5620.32 -2495.50 6149.43 2526.44 5617.13 -2526.44 6159.15 2558.14 5613.81 -2558.14 6169.19 2589.11 5610.35 -2589.12 6178.96 2621.47 5606.07 -2621.47 6188.71 2651.78 5601.48 -2651.78 6197.46 2681.55 5596.83 -2681.55 6206.07 2714.08 5591.95 -2714.09 6215.80 2745.39 5587.42 -2745.39 6225.47 2776.64 5582.72 -2776.64 6235.10 2807.95 5577.50 -2807.95 6244.45 At DLS 5rvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) ------- ----- ----- ------ 341.45 1.49 BP_MWD+IFR+MS 341.15 4.16 BP_MWD+IFR+MS 340.86 3.22 BP_MWD+IFR+MS 340.56 2.10 BP MWD+IFR+MS 340.28 1.48 BP MWD+IFR+MS 339.99 0.98 BP_MWD+IFR+MS 339.70 13.44 BP_MWD+IFR+MS 339.42 3.75 BP_MWD+IFR+MS • 339.13 1.06 BP_MWD+IFR+MS 338.85 0.13 BP MWD+IFR+MS 338.56 4.95 BP MWD+IFR+M5 338.28 4.31 BP_MWD+IFR+MS 338.00 1.60 BP_MWD+IFR+MS 337.72 3.53 BP_MWD+IFR+MS 337.44 1.48 BP MWD+IFR+MS 337.17 0.28 BP MWD+IFR+MS 336.89 2.31 BP MWD+IFR+MS 336.62 4.59 BP_MWD+IFR+MS 336.34 4.95 BP_MWD+IFR+MS 336.06 1.22 BP MWD+IFR+MS 335.78 3.07 BP_MWD+IFR+MS 335.50 2.86 BP_MWD+IFR+MS 335.23 1.33 BP_MWD+IFR+MS 334.94 8.43 BP_MWD+IFR+MS 334.67 1.45 BP MWD+IFR+MS 334.40 3.25 BP_MWD+IFR+MS 334.11 5.74 BP_MWD+IFR+MS 333.83 2.98 BP_MWD+IFR+MS 333.56 1.68 BP_MWD+IFR+MS 333.28 6.87 BP MWD+IFR+MS [(c)2009 IDEAL ID13_OC_14] SCHLUMBERGER Survey Report 14-Feb-2009 09:20:43 Page 14 of 14 Seq Measured # depth - (ft) 361 13662.39 362 13692.94 363 13725.75 364 13757.26 365 13788.90 366 13819.32 367 13851.27 368 13883.04 369 13926.34 370 13980.00 Incl angle (deg) 90.16 90.02 89.78 89.65 89.37 89.03 88.62 88.72 89.65 89.65 Azimuth Course angle length (deg) (ft) 259.22 31.16 259.27 30.55 258.88 32.81 259.49 31.51 258.67 31.64 257.68 30.42 258.43 31.95 259.76 31.77 261.88 43.30 261.88 53.66 TVD depth (ft) 8684.51 8684.46 8684.52 8684.67 8684.94 8685.37 8686.02 8686.76 8687.38 8687.71 -------- ---------------- ------ Vertical Displ Displ Total section +N/S- +E/W- displ (ft) (ft) (ft) (ft) 2838.57 5571.75 -2838.58 6253.15 2868.59 5566.04 -2868.59 6261.76 2900.80 5559.83 -2900.81 6271.07 2931.75 5553.91 -2931.76 6280.22 2962.82 5547.92 -2962.82 6289.49 2992.59 5541.69 -2992.59 6298.09 3023.84 5535.08 -3023.84 6307.19 3055.03 5529.07 -3055.03 6316.95 3097.77 5522.16 -3097.77 6331.70 3150.89 5514.58 -3150.89 6351.28 ------- ----- ----- ------ At DLS Srvy Tool Azim (deg/ tool Corr (deg) 100f) type (deg) 333.00 1.34 BP_MWD+IFR+MS 332.73 0.49 BP MWD+IFR+MS 332.45 1.40 BP MWD+IFR+MS 332.17 1.98 BP MWD+IFR+MS 331.90 2.74 BP MWD+IFR+MS 331.63 3.44 BP_MWD+IFR+MS 331.35 2.67 BP_MWD+IFR+MS 331.08 4.20 BP_MWD+IFR+MS 330.71 5.35 BP_MWD+IFR+MS 330.26 0.00 Projected_TD [(c)2009 IDEAL ID13_OC_14] Schlumber er g Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc Dispatched To: Christine Mahnken (AOGCC) Well No F-19A Date Dispatched: 18-Feb-09 Installation/Rig 7ES Dispatched By: Paul Wyman LWD Log DeliveryV2.1, 03-06-06 Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Johnson Received By: .~ BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) _ 1 ~ 5 ~.~ ~t.t~ v'~ 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojh@bp.com ~~ ~~ ~2~ >~~~~c~1 1 • • gyro ata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 December 17, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: F Pad, Well #F-19A Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, ob houp North American Regional Manager RS:tf Serving the ~Norldwide Energy industry with Precision Survey Instrumentation gyro ata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 7131461-0920 SURVEY REPORT BP F Pad #F-19A Mast Unit Prudhoe Bay, AK AK1208G_173 14 Dec 2008 Serving the Worldwide Energy Industry with Precision Survey Instrumentation ~o~-t7.3 A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 Run Date: 14 Dec 2008 Surveyor: James Butler Calculation Method: MINIMUM CURVATURE Survey surface coordinates obtained from: Hand Held GPS Survey Latitude: 70.335540 deg. N Longitude: 148.764510 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 25 ft. VERTICAL CLOSURE DEPTH DIST. AZIMUTH feet feet deg. HORIZONTAL COORDINATES feet 0.00 N 0.00 E 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 ----------------------------------------------------------------- 0 - 11325 FT. RATE GYROSCOPIC CONTINUOUS MULTISHOT SURVEY RUN INSIDE 4-1/2" TUBING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO THE ORIGINAL R.K.B. OF 71.38 FT. AMSL 99.70 0.11 332.77 N 27 14 W 0.03 199.80 0.32 162.18 S 17 49 E 0.11 295.50 0.20 242.35 S 62 21 W 0.09 299.70 0.40 226.96 S 46 58 W 1.27 399.60 0.52 200.37 S 20 22 W 0.06 496.10 0.48 161.17 S 18 50 E 0.09 499.20 0.59 188.53 S 8 32 W 2.22 599.30 0.39 166.12 S 13 53 E 0.07 695.80 0.42 144.16 S 35 50 E 0.04 699.00 0.18 160.27 S 19 44 E 1.97 799.10 0.56 179.06 - _ S A, 56 ,_E _ 0.1:0. - 895.60 0.22 120`.03 S 59 58 E 0.13 899.10 0.15 139.99 S 40 1 E 0.67 998.50 0.06 111.53 S 68 28 E 0.03 1095.30 0.27 113.29 S 66 43 E 0.05 1098.70 0.43 161.66 S 18 20 E 2.37 1198.40 0.07 198.04 S 18 2 W 0.09 1295.20 0.26 120.70 S 59 18 E 0.07 1298.80 0.07 196.84 S 16 50 W 1.75 1398.20 0.30 6.80 N 6 48 E 0.09 99.70 0.1 332.8 0.09 N 199.80 0.1 181.3 0.10 S 295.50 0.4 189.1 0.43 S 299.70 0.4 191.0 0.44 S 399.60 1.2 204.3 1.10 S 496.09 2.0 195.3 1.90 S 499.19 2.0 195.1 1.93 S 599.29 2.8 190.5 2.77 S 695.79 3.4 183.9 3.37 S 698.99 3.4 183.7 3.39 S 799.08 4A 1.82.2. 4.02 S 895.58 4.6 179.9 4.59 S 899.08 4.6 179.8 4.59 S 998.48 4.7 178.2 4.71 S 1095.28 4.8 175.2 4.82 S 1098.68 4.9 175.0 4.84 S 1198.38 5.3 174.4 5.25 S 1295.18 5.5 172.8 5.42 S 1298.78 5.5 172.7 5.42 S 1398.18 5.3 172.3 5.22 S 0.04 W 0.00 W 0.07 W 0.09 W 0.50 W 0.52 W 0.52 W 0.51 W 0.23 W 0.22 W 0.16 W 0.01 E 0.02 E 0.15 E 0.41 E 0.42 E 0.52 E 0.69 E 0.70 E 0.71 E 2 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 1495 20 4.03 15.86 N 15 52 E 0.96 1495.09 2.4 135.4 1.69 S 1.67 E . 1498.50 3.45 15.77 N 15 46 E 4.39 1498.39 2.3 130.6 1.48 S 1.73 E 10 1598 4.94 10.77 N 10 46 E 0.38 1597.72 6.5 30.8 5.61 N 3.34 E . 1695.00 5.14 14.44 N 14 26 E 0.10 1694.24 14.9 20.5 13.92 N 5.21 E 1698.10 5.06 11.01 N 11 1 E 2.54 1697.33 15.1 20.4 14.18 N 5.27 E 1797 90 5.39 16.58 N 16 35 E 0.15 1796.72 24.2 17.9 23.00 N 7.45 E . 1894 60 8.43 44.15 N 44 9 E 1.14 1892.73 35.2 22.9 32.44 N 13.68 E . 1897.80 8.20 39.76 N 39 46 E 5.27 1895.89 35.6 23.1 32.78 N 13.99 E 1997 80 8.90 41.67 N 41 40 E 0.19 1994.78 50.0 28.3 44.04 N 23.70 E . 2094.80 10.32 35.83 N 35 50 E 0.44 2090.42 66.0 30.8 56.69 N 33.77 E 80 2097 10.23 36.47 N 36 28.E 1.21 2093.37 66.5 30.8 57.13 N 34.09 E . 2197 40 11.53 20.18 N 20 11 E 0.83 2191.20 85.1 30.2 73.59 N 42.78 E . 100 00 0.15 309.08 N 50 55 W 0.04 100.00 0.1 309.1 0.08 N O.lOW . 200 00 0.33 172.40 S 7 36 E 0.11 200.00 0.2 232.4 0.12 S 0.16 W . 300.00 0.41 220.38 S 40 23 W 0.08 300.00 0.8 207.5 0.68 S 0.36 W 400 00 0.53 T96.71 S 16 43 W 0.06 399.99 1.6 207.3 1.40 S 0.72 W . 500 00 0.56 184.31 S 4 19 W 0.03 499.99 2.5 200.9 2.33 S 0.89 W . 600 00 0.36 168.08 S 11 55 E 0.06 599.99 3.2 195.4 3.12 S 0.86 W . 700.00 0.24 164.54 S 15 28 E 0.03 699.99 3.7 191.5 3.63 S 0.74 W 800.00 0.50 172.34 S 7 40 E 0.06 799.98 4.3 188.4 4.27 S 0.63 W 900 00 0.14 137.65 S 42 21 E 0.10 899.98 4.8 185.8 4.78 S 0.49 W . 00 1000 0.12 120.57 S 59 26 E 0.01 999.98 4.9 183.7 4.92 S 0.32 W . 1100.00 0.37 166.68 S 13 19 E 0.08 1099.98 5.3 .181.7 5.29 S 0.16 W 1200.00 0.07 196.39 S 16 24 W 0.08 1199.98 5.7 181.0 5.67 S 0.10 W 3 L~ A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEAR ING SEVERITY DEPTH DIST. AZ IMUTH COORDINA TES feet deg. deg. deg. min. deg./ ..feet feet deg. feet 25 ft. 1300.00 0.10 222.61 S 42 37 W 0.01 1299.98 5.8 181.8 5.80 S 0.18 W 00 1400 81 0 8.93 N 8 56 E 0.22 1399.98 5.2 181.5 5.17 S 0.13 W . 00 1500 . 3.69 17.65 N 17 39 E 0.72 1499.89 1.7 145.9 1.41 S 0.95 E . 00 1600 4.96 13.42 N 13 25 E 0.33 1599.60 6.6 26.6 5.86 N 2.93 E . 1700 00 5.12 14.53 N 14 32 E 0.05 1699.22 15.2 19.4 14.38 N 5.05 E . 1800.00 5.85 23.17 N 23 10 E 0.28 1798.76 24.8 19.3 23.39 N 8.18 E 1900 00 8.32 42.96 N 42 57 E 0.86 1898.00 36.6 24.4 33.37 N 15.12 E . 2000 00 9.12 43.69 N 43 41 E 0.20 1996.85 51.2 29.9 44.40 N 25.52 E . 00 2100 10.45 36.58 N 36 35 E 0.45 2095.39 68.0 32.4 57.41 N 36.40 E . 2200 00 11 91 21.74 N 21 45 E 0.80 2193.51 87.2 31.6 74.27 N 45.62 E . 2300.00 . 14.25 15.49 N 15 30 E 0.68 2290.92 109.3 28.9 95.73 N 52.74 E 00 2325 15.03 14.03 N 14 2 E 0.86 2315.11 115.4 28.1 101.84 N 54.34 E . 235 0 00 15.71 12.67 N 12 40 E 0.77 2339.21 121.8 27.3 108.28 N 55.87 E . . .. _ 00 2375 16.00 ....._ 12.44 N 12 27 E 030 2363.26 12$.3 26.5 114.95 N _ 57.36 E . 00 2400 16.47 12.09 N 12 6 E 0.48 2387.26 135.3 25.8 121.78 N 58.84 E . 2425.00 16.88 .......12.15:..... N 12 _ , 9 E 0.4.1 24-1.1.21 -..142.2.. . 25.1..: .......128.80 N 60.35 E 2450 00 17.35 11.86 N 11 52 E 0.47 2435.10 149.4 24.5 135.99 N 61.88 E . 00 2475 17.95 11.72 N 11 43 E 0.61 2458.93 156.8 23.9 143.41 N 63.43 E . 00 2500 18.46 11.52 N i l 31 E 0.52 2482.67 164.5 23.3 151.07 N 65.00 E . 00 2525 19.16 11.40 N 11 24 E 0.70 2506.34 172.4 22.7 158.97 N 66.60 E . 2550.00 19.77 11.23 N 11 14 E 0.61 2529.91 180.5 22.2 167.14 N 68.24 E 2575 00 20.65 10.93 N 10 56 E 0.88 2553.37 189.0 21.7 175.61 N 69.90 E . 00 2600 21 38 10.67 N 10 40 E 0.74 2576.71 197.8 21.2 184.42 N 71.58 E . 2625.00 . 21.77 10.58 N 10 35 E 0.39 2599.96 206.9 20.7 193.45 N 73.27 E 4 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 2650.00 22.25 10.34 N 10 21 E 0.49 2623.13 216.1 20.3 202.67 N 74.97 E 2675.00 22.50 10.34 N 10 21 E 0.25 2646.25 225.5 19.9 212.03 N 76.68 E 2700.00 22.74 10.34 N 10 20 E 0.24 2669.33 235.0 19.5 221.49 N 78.41 E 2725.00 23.35 10.23 N 10 14 E 0.61 2692.33 244.6 19.1 231.12 N 80.15 E 2750.00 23.69 10.26 N 10 16 E 0.34 2715.26 254.5 18.8 240.93 N 81.93 E 2775.00 24.15 10.19 N 10 12 E 0.46 2738.11 264.5 18.5 250.91 N 83.73 E 2800.00 25.09 9.91 N 9 55 E 0.95 2760.84 274.8 18.1 261.16 N 85.55 E 2825.00 26.53 9.04 N 9 2 E 1.49 2783.34 285.6 17.8 271.90 N 87.34 E 2850.00 27.56 8.73 N 8 44 E 1.03 2805.61 296.8 17.5 283.13 N 89.09 E 2875.00 28.24 8.62 N 8 37 E 0.69 2827.70 308.4 17.1 294.70 N 90.86 E 2900.00 29.35 8.56 N 8 34 E 1.10 2849.61 320.3 16.8 306.60 N 92.65 E 2925.00 30.15 8.74. N 8 44 E 0.81 2871.32 332.6 16.5 318.86 N 94.52 E 2950.00 30.66 8.90- N 8 54, E 0.52 2892.88 345.1 16.2 331.37 N 96.46 E 2975.00 31.18 9.29 N 9 17 E 0.55 2914.32 357.9 16.0 344.05 N 98.49 E 3000.00 31.73 9.79 N 9 48 E 0.61 2935.65 370.8 15.7 356.92 N 100.65 E 3025.00 32.34. 10.33 N I0- 20 E 0:67 2956.85 384.0.. -- 15.6-, 369.97 N 102.97 E 3050.00 33.03 10.16 N 10 TO E D.69 2977.89 397.5 15.4 383.26 N 105.37 E 3075.00 34.35 8.70 N 8 42 E 1.55 2998.69 411.3 15.2 396.93 N 107.64 E 3100.00 35.48 7.67 N 7 40 E 1.28 3019.19 425.5 14.9 411.10 N 109.67 E 3125.00 36.14 7.30 N 7 18 E 0.70 3039.46 440.0 .14.7 425.60 N 111.58 E 3150.00 36.76 6.60 N 6 36 E 0.75 3059.57 454.7 14.4 440.34 N 113.38 E 3175.00 37.56 5.64 N 5 38 E 0.99 3079.50 469.7 14.2 455.36 N 114.98 E 3200.00 38.88 4.92 N 4 55 E 1.39 3099.14 484.9 13.9 470.76 N 116.41 E 3225.00 39.62 4.62 N 4 37 E 0.76 3118.50 500.6 13.6 486.52 N 117.72 E 5 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 3250.00 40.61 4.29 N 4 17 E 1.01 3137.62 516.5 13.3 502.58 N 118.97 E 3275.00 41.35 4.23 N 4 14 E 0.75 3156.49 532.7 13.0 518.93 N 120.19 E 3300.00 42.10 4.24 N 4 14 E 0.75 3175.15 549.1 12.8 535.52 N 121.42 E 3325.00 42.85 4.22 N 4 13 E 0.75 3193.59 565.8 12.5 552.36 N 122.66 E 3350.00 43.54 4.21 N 4 13 E 0.70 3211.81 582.8 12.3 569.42 N 123.92 E 3375.00 44.24 4.24 N 4 14 E 0.70 3229.83 599.9 12.0 586.71 N 125.20 E 3400.00 44.98 4.21 N 4 13 E 0.74 3247.63 617.3 11.8 604.22 N 126.49 E 3425.00 45.86 4.25 N 4 15 E 0.88 3265.17 635.0 11.6 621.98 N 127.81 E 3450.00 46.57 4.27 N 4 16 E 0.71 3282.47 652.9 11.4 639.98 N 129.15 E 3475.00 47.27 4.28 N 4 17 E 0.70 3299.55 671.0 11.2 658.18 N 130.51 E 3500.00 48.07 4.36 N 4 21 E 0.81 3316.38 689.3 11.0 676.61 N 131.90 E 3525.00 48.70 4.40 N 4 24 E 0.62 3332.99 707.9 10.9 695.25 N 133.33 E 3550.00 49.29 4.40 N 4 24 E 0.60 3349.39 726.7 10.7 714.06 N 134.77 E 3575.00 49.87 4.39 N 4 24 E 0.58 3365.60 745.6 10.5 733.04 N 136.23 E 3600.00 50.51 4.42 N 4 25 E 0.63 3381.60 764.7 10.4 752.18 N 137.71 E 3625.00 51.02 4.41 N .4... .25 E _ 0.51 3397.42. 783.9 10.2. 771.49 N 139.20 E 3650.00 51.36 4.42 N 4 25 E" 0.35 3413.09 803.3 10.1 790.91 N 140.70 E 3675.00 51.15 4.49 N 4 30 E 0.22 3428.73 822.7 10.0 810.35 N 142.21 E 3700.00 51.17 4.50 N 4 30 E 0.02 3444.41 842.1 9.8 829.77 N 143.74 E 3725.00 51.24 4.52 N 4 31 E 0.07 3460.07 861.5 9.7 849.19 N 145.27 E 3750.00 51.10 4.53 N 4 32 E 0.14 3475.75 880.9 9.6 868.61 N 146.81 E 3775.00 51.33 4.52 N 4 31 E 0.23 3491.41 900.3 9.5 888.03 N 148.35 E 3800.00 51.18 4.49 N 4 30 E 0.15 3507.06 919.8 9.4 907.47 N 149.88 E 3825.00 51.21 4.49 N 4 30 E 0.02 3522.72 939.2 9.3 926.89 N 151.41 E 6 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. d eg. min. deg./ feet feet deg. feet 25 ft. 3850.00 51.25 4.48 N 4 29 E 0.05 3538.38 958.6 9.2 946.32 N 152.93 E 3875.00 51.17 4.55 N 4 33 E 0.10 3554.04 978.0 9.1 965.75 N 154.47 E 3900.00 51.29 4.58 N 4 35 E 0.13 3569.69 997.5 9.0 985.18 N 156.02 E 3925.00 51.04 4.62 N 4 37 E 0.26 3585.37 1016.9 8.9 1004.59 N 157.58 E 3950.00 51.14 4.68 N 4 41 E 0.11 3601.07 1036.3 8.8 1023.98 N 159.16 E 3975.00 51.12 4.68 N 4 41 E 0.01 3616.76 1055.7 8.8 1043.38 N 160.75 E 4000.00 51.03 4.69 N 4 41 E 0.10 3632.47 1075.1 8.7 1062.76 N 162.33 E 4025.00 51.09 4.70 N 4 42 E 0.07 3648.18 1094.5 8.6 1082.14 N 163.93 E 4050.00 51.05 4.70 N 4 42 E 0.04 3663.89 1113.9 8.5 1101.53 N 165.52 E 4075.00 50.95 4.67 N 4 40 E 0.11 3679.62 1133.3 8.5 1120.89 N 167.11 E 4100.00 51.14 4.66 N 4 40 E 0.19 3695.34 1152.7 8.4 1140.27 N 168.69 E 4125.00 50.98 4.63 N 4 38 E 0.16 3711.06 1172.1 8.4 1159.65 N 170.26 E 4150.00 51.08 4.64 N 4 38 E 0.10 3726.78 1191.5 8.3 1179.02 N 171.83 E 4175.00 51.05 4.59 N 4 35. E 0.05 3742.49 1210.9 8.2 1198.40 N 173.40 E 4200.00 50.93 4.65 N 4 39 E 0.13 3758.23 1230.3 8.2 1217.76 N 174.96 E 4225.00 51.15 __ 4,60 _, ,_N 4- _ 36 E , _0.22 3773..95. 1249.7. . 8, L_ _ 1.237.14 N 176.53 E 4250.00 51.02 4:65 N 4 39 E 0.13 3789.65 1269.T 8.1 1256.53 N 178.10 E 4275.00 51.11 4.62 N 4 37 E 0.09 3805.36 1288.5 8.0 1275.91 N 179.67 E 4300.00 50.97 4.63 N 4 38 E 0.14 3821.08 1307.9 8.0 1295.29 N 181.24 E 4325.00 50.41 4.60 N 4 36 E 0.56 3836.92 1327.2 7.9 1314.57 N 182.79 E 4350.00 50.67 4.62 N 4 37 E 0.27 3852.81 1346.5 7.9 1333.81 N 184.34 E 4375.00 51.04 4.63 N 4 38 E 0.36 3868.59 1365.8 7.8 1353.14 N 185.91 E 4400.00 51.18 4.57 N 4 34 E 0.15 3884.29 1385.3 7.8 1372.53 N 187.47 E 4425.00 51.06 4.58 N 4 35 E 0.12 3899.98 1404.7 7.7 1391.93 N 189.02 E 7 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL DEPTH BEARING SEVERITY DEPTH feet .deg. deg. deg. min. deg./ feet 25 ft. CLOSURE HORIZONTAL DIST. AZIMUTH COORDINATES feet deg. feet 4450.00 50.97 4.55 N 4 33 E 0.10 3915.71 1424.1 4475.00 50.64 4.49 N 4 29 E 0.33 3931.50 1443.5 4500.00 50.65 4.46 N 4 27 E 0.03 3947.36 1462.8 4525.00 50.63 4.46 N 4 27 E 0.02 3963.21 1482.1 4550.00 50.65 4.49 N 4 29 E 0.04 3979.07 1501.4 4575.00 50.65 4.51 N 4 31 E 0.02 3994.92 1520.7 4600.00 50.52 4.45 N 4 27 E 0.14 4010.79 1540.0 4625.00 50.37 4.49 N 4 29 E 0.15 4026.71 1559.2 4650.00 50.45 4.50 N 4 30 E 0.08 4042.65 1578.4 4675.00 50.44 4.53 N 4 32 E 0.02 4058.57 1597.7 4700.00 50.63 4.50 N 4 30 E 0.20 4074.46 1617.0 4725.00 50.89 4.56 N 4 33 E 0.26 4090.27 1636.3 4750.00 50.52 4.54 N 4 33 E 0.37 4106.11 1655.6 4775.00 50.38 4.56 N 4 34 E 0.13 4122.02 1674.9 4800.00 50.46 4.51 N 4 31 E 0.08 4137.95 1694.1 4825.00 50.20 4.49- N 4 30 E D.26 - 4153..91 1713.4 4850.00 50.40 4.44 N 4 27 E 0.20 4169.$8 1732.6 4875.00 50.37 4.43 N 4 26 E 0.03 4185.82 1751.8 4900.00 50.17 4.45 N 4 27 E 0.20 4201.80 1771.0 4925.00 50.48 4.42 N 4 25 E 0.30 4217.76 1790.2 4950.00 50.09 4.48 N 4 29 E 0.39 4233.73 1809.5 4975.00 50.36 4.44 N 4 26 E 0.27 4249.73 1828.6 5000.00 50.46 4.45 N 4 27 E 0.10 4265.66 1847.9 5025.00 50.31 4.50 N 4 30 E 0.15 4281.60 1867.1 5050.00 50.24 4.56 N 4 34 E 0.09 4297.58 1886.3 7.7 1411.30 N 190.57 E 7.6 1430.62 N 192.09 E 7.6 1449.89 N 193.60 E 7.6 1469.16 N 195.10 E 7.5 1488.43 N 196.61 E 7.5 1507.70 N 198.13 E 7.4 1526.96 N 199.64 E 7.4 1546.17 N 201.14 E 7.4 1565.38 N 202.65 E 7.3 1584.59 N 204.17 E 7.3 1603.83 N 205.68 E 7.3 1623.14 N 207.21 E 7.2 1642.42 N 208.75 E 7.2 1661.64 N 210.28 E 7.2 1680.85 N 211.80 E 7.2 1700.03 N 213.31 E 7.1 1719.21 N 214.81 E 7.1 1738.41 N 216.30 E 7.1 1757.58 N 217.79 E 7.0 1776.76 N 219.28 E 7.0 1795.94 N 220.77 E 7.0 1815.09 N 222.26 E 7.0 1834.30 N 223.76 E 6.9 1853.50 N 225.26 E 6.9 1872.66 N 226.78 E 8 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 25 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 5075.00 49.98 4.62 N 4 37 E 0.26 4313.61 1905.5 6.9 1891.78 N 228.31 E 5100.00 50.20 4.71 N 4 43 E 0.24 4329.65 1924.7 6.9 1910.90 N 229.87 E 5125.00 50.14 4.67 N 4 40 E 0.07 4345.67 1943.9 6.8 1930.03 N 231.44 E 5150.00 49.90 4.71 N 4 43 E 0.24 4361.73 1963.0 6.8 1949.12 N 233.01 E 5175.00 50.19 4.71 N 4 42 E 0.30 4377.79 1982.2 6.8 1968.22 N 234.58 E 5200.00 50.13 4.68 N 4 41 E 0.06 4393.80 2001.3 6.8 1987.35 N 236.15 E 5225.00 50.10 4.71 N 4 42 E 0.04 4409.83 2020.5 6.8 2006.47 N 237.72 E 5250.00 49.84 4.74 N 4 44 E 0.26 4425.91 2039.6 6.7 2025.55 N 239.30 E 5275.00 49.75 4.84 N 4 51 E 0.12 4442.05 2058.7 6.7 2044.58 N 240.89 E 5300.00 49.99 4.84 N 4 50 E 0.24 4458.16 2077.8 6.7 2063.63 N 242.50 E 5325.00 49.50 4.87 N 4 52 E 0.49 4474.31 2096.9 6.7 2082.64 N 244.12 E 5350.00 49.96 5.02 N 5 1 E 0.47 4490.47 2116.0 6.7 2101.64 N 245.76 E 5375.00 49.88 5.30 N 5 18 E 0.23 4506.57 2135.1 6.7 2120.69 N 247.48 E 5400.00 49.94 5.79 N 5 48 E 0.38 4522.67 2154.2 6.6 2139.73 N 249.33 E 5425.00 50.26 6.13 N 6 8 E 0.41 4538.71 2173.4 6.6 2158.81 N 251.32 E 5450.00 50.20 6.46 N 6 28 E 0.26 4554.70 2192.6 6.6 2177.90 N 253.43 E 5475.00 50.27 6.67 N 6 40 E 0.17 4570.69 2211.8 6.6 2197.00 N 255.63 E 5500.00 50.32 6.86 N 6 52 E 0.16 4586.66 2231.1 6.6 2216.10 N 257.89 E 5525.00 49.99 6.98 N 6 59 E 0.34 4602.68 2250.2 6.6 2235.15 N 260.21 E 5550.00 50.31 7.10 N 7 6 E 0.33 4618.70 2269.4 6.6 2254.20 N 262.56 E 5575.00 50.36 7.42 N 7 25 E 0.26 4634.66 2288.7 6.6 2273.29 N 264.99 E 5600.00 50.87 7.81 N 7 49 E 0.59 4650.52 2308.0 6.7 2292.44 N 267.55 E 5625.00 51.05 8.05 N 8 3 E 0.26 4666.27 2327.4 6.7 2311.67 N 270.23 E 5650.00 51.48 8.07 N 8 4 E 0.43 4681.91 2346.9 6.7 2330.98 N 272.96 E 9 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 5675.00 51.24 8.05 N 8 3 E 0.23 4697.52 2366.4 6.7 2350.31 N 275.70 E 5700.00 51.12 8.10 N 8 6 E 0.13 4713.19 2385.9 6.7 2369.60 N 278.44 E 5725.00 51.25 8.17 N 8 10 E 0.13 4728.86 2405.4 6.7 2388.88 N 281.20 E 5750.00 51.36 8.30 N 8 18 E 0.15 4744.49 2424.9 6.7 2408.19 N 283.99 E 5775.00 51.42 8.48 N 8 29 E 0.16 4760.09 2444.4 6.7 2427.52 N 286.84 E 5800.00 51.83 8.74 N 8 44 E 0.46 4775.61 2464.0 6.8 2446.90 N 289.78 E 5825.00 52.09 8.88 N 8 53 E 0.28 4791.02 2483.7 6.8 2466.36 N 292.79 E 5850.00 52.28 9.01 N 9 0 E 0.21 4806.35 2503.4 6.8 2485.86 N 295.86 E 5875.00 52.32 9.05 N 9 3 E 0.05 4821.63 2523.2 6.8 2505.40 N 298.97 E 5900.00 52.33 9.09 N 9 6 E .0.04 4836.91 2542.9 6.8 2524.94 N 302.09 E 5925.00 52.32 9.01 N 9 1 E 0..07 4852.19 2562.7 6.8 2544.48 N 305.20 E 5950.00 51.94 8.98 N 8 59 E 0:38 4867.54 2582.4 6.9 2563.97 N 308.29 E 5975.00 51.91 8.97 N 8 58 E 0.03 4882.96 2602.1 6.9 2583.41 N 311.36 E 6000.00 51.50 8.92 N 8 55 E 0.42 4898.45 2621.7 6.9 2602.80 N 314.41 E 6025.00 51.91 8.88 N 8 53 E 0.42 4913.94 2641.3 6.9 2622.18 N 317.44 E 6050.00 52.01 8,87 N - 8- 52 E _ 0.10. 4929.35 2661.0 - 6.9 2641.63 N 320.48 E 6075.00 S 1.69 8.96 N 8 57 E 0.33 4944.79 2680.7 6.9 2661.06 N 323.53 E 6100.00 51.36 9.06 N 9 4 E 0.35 4960.34. 2700.2 6.9 2680.39 N 326.59 E 6125.00 51.71 9.05 N 9 3 E 0.35 4975.89 2719.8 7.0 2699.72 N 329.67 E 6150.00 51.84 9.07 N 9 4 E 0.13 4991.36 2739:4 7.0 2719.11 N 332.77 E 6175.00 52.04 9.22 N 9 13 E 0.23 5006.77 2759.1 7.0 2738.55 N 335.90 E 6200.00 51.55 9.36 N 9 22 E 0.50 5022.24 2778.7 7.0 2757.93 N 339.07 E 6225.00 51.96 9.64 N 9 38 E 0.47 5037.71 2798.3 7.0 2777.30 N 342.31 E 6250.00 51.59 9.78 N 9 47 E 0.39 5053.18 2817.9 7.0 2796.66 N 345.62 E • • 10 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL DEPTH BEARING SEVERITY DEPTH feet deg. deg. deg. min. deg./ feet 25 ft. CLOSURE HORIZONTAL DIST. AZIMUTH COORDINATES feet deg. feet 6275.00 51.81 9.76 N 9 46 E 0.21 5068.67 2837.5 6300.00 51.79 9.68 N 9 41 E 0.06 5084.13 2857.2 6325.00 51.93 9.69 N 9 41 E 0.14 5099.57 2876.8 6350.00 52.11 9.72 N 9 43 E 0.18 5114.96 2896.5 6375.00 52.34 9.90 N 9 54 E 0.27 5130.27 2916.2 6400.00 52.17 10.50 N 10 30 E 0.51 5145.58 2936.0 6425.00 51.82 11.11 N 11 7 E 0.59 5160.97 2955.6 6450.00 52.14 11.31 N 11 18 E 0.36 5176.37 2975.3 6475.00 51.87 11.21 N 11 13 E 0.29 5191.76 2994.9 6500.00 51.96 11.15 N 11 9 E 0.10 5207.18 3014.6 6525.00 52.36 11.13 N 11 8 E 0.41 5222.52 3034.2 6550.00 52.33 11.16. N 11 9 E 0.04 5237.79 3054.0 6575.00 52.50 11.16` N 11 10 E 0.16 5253.04 3073.8 6600.00 52.29 11.11 N 11 6 E 0.21 5268.29 3093.5 6625.00 52.58 11.23 N 11 14 E 0.31 5283.53 3113.3 6650.00 52.72 .......11.36 N 11....... ..22.. ...E 0.1.7 5298.70 3133.-1 6675.00 52.58 11.43 N 11 26 E 0.15 5313.87 3T53.0 6700.00 52.87 11.32 N 11 19 E 0.31 5329.01 3172.8 6725.00 52.78 11.28 N 11 17 E 0.10 5344.12 3192.7 6750.00 52.56 11.24 N 11 14 E 0.22 5359.28 3212.5 6775.00 52.70 11.22 N 11 13 E 0.14 5374.45 3232.3 6800.00 52.51 11.29 N 11 18 E 0.20 5389.63 3252.2 6825.00 52.67 11.41 N 11 24 E 0.18 5404.82 3272.0 6850.00 52.58 11.50 N 11 30 E 0.11 5420.00 3291.8 7.1 2815.99 N 348.95 E 7.1 2835.36 N 352.27 E 7.1 2854.74 N 355.58 E 7.1 2874.16. N 358.90 E 7.1 2893.64 N 362.27 E 7.2 2913.09 N 365.77 E 7.2 2932.44 N 369.46 E 7.2 2951.76 N 373.29 E 7.2 2971.08 N 377.14 E 7.3 2990.38 N 380.95 E 7.3 3009.75 N 384.77 E 7.3 3029.17 N 388.59 E 7.3 3048.61 N 392.43 E 7.4 3068.04 N 396.25 E 7.4 3087.49 N 400.09 E 7.4 3.106.98 N 403.98 E 7.4 3126.46 N 407.91 E 7.5 3145.96 N 411.83 E 7.5 3165.49 N 415.73 E 7.5 3184.99 N 419.62 E 7.5 3204.48 N 423.49 E 7.6 3223.96 N 427.36 E 7.6 3243.42 N 431.27 E 7.6 3262.90 N 435.22 E • 11 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 6875.00 52.55 11.48 N 11 29 E 0.04 5435.19 3311.6 7.6 3282.35 N 439.17 E 6900.00 52.54 11.59 N 11 35 E 0.09 5450.40 3331.4 7.6 3301.79 N 443.14 E 6925.00 52.48 11.63 N 11 38 E 0.06 5465.61 3351.2 7.7 3321.22 N 447.13 E 6950.00 52.54 11.67 N 11 40 E 0.07 5480.83 3371.0 7.7 3340.65 N 451.14 E 6975.00 52.41 11.63 N 11 38 E 0.13 5496.06 3390.8 7.7 3360.07 N 455.14 E 7000.00 52.46 11.69 N 11 42 E 0.07 5511.30 3410.5 7.7 3379.48 N 459.15 E 7025.00 52.39 11.71 N 11 42 E 0.07 5526.54 3430.3 7.8 3398.88 N 463.17 E 7050.00 52.22 11.72 N 11 43 E 0.17 5541.83 3450.0 7.8 3418.25 N 467.18 E 7075.00 52.36 11.85 N 11 51 E 0.18 5557.12 3469.8 7.8 3437.61 N 471.22 E 7100.00 52.23 11.88 N 11 53 E 0.13 5572.41 3489.5 7.8 3456.97 N 475.29 E 7125.00 52.27 11.91 N 11 54 E 0.04 5587.72 3509.2 7.9 3476.31 N 479.36 E 7150.00 52.27 11.98 N 11 59 E 0.06 5603.01 3528.9 7.9 3495.66 N 483.45 E 7175.00 52.05 11.92 N 11 55 E 0.22 5618.35 3548.6 7.9 3514.97 N 487.54 E 7200.00 52.29 11.87 N 11 52 E 0.24 5633.68 3568.3 7.9 3534.29 N 491.61 E 7225.00 52.03 11.95 N 11 57 E 0.27 5649.02 3588.0 7.9 3553.61 N 495.69 E 7250.00 52.03 1.1.88.. _N 11- 53_ E 0.06 5664.40 3.607:.7. 8.0 3.572.89 N 499.76 E 7275.00 52.10 1'1.91 N 11 55 E 0.08 5679.77 3627.3 8.0 3592.19 N 503.82 E 7300.00 51.84 11.94 N 11 56 E 0.27 5695.17 3647.0 8.0 3611.45 N 507.89 E 7325.00 51.86 12.05 N 12 3 E 0.09 5710.62 3666.6 8.0 3630.68 N 511.98 E 7350.00 51.17 12.01 N 12 1 E 0.68 5726.17 3686.1 8.0 3649.82 N 516.06 E 7375:00 51.88 11.91 N 11 55 E .0.71 5741.73 3705.7 8.1 3668.97 N 520.11 E 7400.00 51.48 11.92 N 11 55 E 0.40 5757.23 3725.2 8.1 3688.16 N 524.16 E 7425.00 51.37 12.01 N 12 1 E 0.13 5772.82 3744.7 8.1 3707.28 N 528.22 E 7450.00 51.10 12.24 N 12 14 E 0.32 5788.47 3764.2 8.1 3726.34 N 532.31 E 12 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7475.00 50.92 12.15 N 12 9 E 0.19 5804.20 3783.6 8.2 3745.34 N 536.41 E 7500.00 51.24 12.11 N 12 6 E 0.32 5819.90 3803.0 8.2 3764.35 N 540.50 E 7525.00 51.19 12.07 N 12 5 E 0.06 5835.56 3822.4 8.2 3783.41 N 544.58 E 7550.00 50.75 12.12 N 12 7 E 0.44 5851.30 3841.8 8.2 3802.40 N 548.65 E 7575.00 50.70 12.16 N 12 9 E 0.06 5867.13 3861.1 8.2 3821.32 N 552.72 E 7600.00 50.56 12.16 N 12 10 E 0.15 5882.99 3880.4 8.2 3840.21 N 556.79 E 7625.00 50.93 12.10 N 12 6 E 0.38 5898.81 3899.7 8.3 3859.14 N 560.86 E 7650.00 51.34 12.01 N 12 1 E 0.42 5914.49 3919.1 8.3 3878.18 N 564.92 E 7675.00 51.17 12.09 N 12 5 E 0.18 5930.14 3938.6 8.3 3897.25 N 568.99 E 7700.00 50.93 11.98 N 11 59 E 0.25 5945.85 3958.0 8.3 3916.26 N 573.05 E 7725.00 50.97 12.04 N 12 2 E 0.06 596:1.60 3977.3 8.3 3935.25 N 577.09 E 7750.00 50.72 12.17 N 12 10 E 0.26 5977.39 3996.7 8.4 3954.21 N 581.15 E 7775.00 50.85 12.08 N 12 5 E 0.14. 5993.20 4016.0 8.4 3973.14 N 585.22 E 7800.00 50.72 12.06 N 12 4 E 0.12 6009.00 4035.3 8.4 3992.09 N 589.27 E 7825.00 50.79 12.22 N 12 13 E 0.14 6024.82 4054.7 8.4 4011.02 N 593.34 E 7850.00 50.71 1.2..08. N 12 5 E 0.14.. 6040.63 4074,0. 8.4 4029.94 N 597.41 E 7875.00 51.01 11.94 N 11 S6 E 0.32 6056.41 4093.3 8.4 4048.91 N 601.45 E 7900.00 51.10 12.10 N 12 6 E 0.16 6072.13 4112.7 8.5 4067.93 N 605.50 E 7925.00 50.54 12.11 N 12 7 E 0.57 6087.92 4132.1 8.5 4086.87 N 609.56 E 7950.00 50.79 11.97 N 11 58 E 0.27 6103.77 4151.4 8.5 4105.79 N 613.60 E 7975.00 50.84 11.96 N 11 58 E 0.06 6119.56 4170.7 8.5 4124.74 N 617.61 E 8000.00 50.64 12.09 N 12 5 E 0.22 6135.38 4190.0 8.5 4143.67 N 621.64 E 8025.00 50.79 12.01 N 12 1 E 0.15 6151.21 4209.4 8.5 4162.60 N 625.68 E 8050.00 50.59 11.93 N 11 56 E 0.21 6167.05 4228.7 8.6 4181.52 N 629.70 E C~ i 13 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 2S ft. 8075.00 50.73 12.22 N 12 13 E 0.27 6182.90 4248.0 8.6 4200.43 N 633.74 E 8100.00 SO.S3 12.OS N 12 3 E 0.24 6198.76 4267.3 8.6 4219.32 N 637.80 E 8125.00 50.37 11.86 N 11 S2 E 0.22 6214.68 4286.5 8.6 4238.18 N 641.80 E 8150.00 50.28 11.88 N 11 S3 E 0.09 6230.64 4305.7 8.6 4257.01 N 645.76 E 8175.00 50.28 11.93 N 11 S6 E 0.03 6246.61 4324.9 8.6 4275.83 N 649.72 E 8200.00 50.31 12.04 N 12 3 E 0.10 6262.58 4344.1 8.7 4294.64 N 653.72 E 8225.00 50.24 11.66 N 11 39 E 0.31 6278.56 4363.3 8.7 4313.46 N 657.67 E 8250.00 49.96 11.54 N 11 33 E 0.29 6294.60 4382.5 8.7 4332.25 N 661.52 E 8275.00 49.92 12.01 N 12 0 E 0.36 6310.69 4401.6 8.7 4350.98 N 665.43 E 8300.00 49.77 11.90 N 11 S4 E 0.16 6326.81 4420.6 8.7 4369.67 N 669.38 E 8325.00 49.78 11.44 N 11 26 E 0.36 6342.95 4439.7 8.7 4388.37 N 673.25 E 8350.00 49.74 11.80 N 11 48 E 0.28 6359.10 4458.8 8.7 4407.06 N 677.09 E 8375.00 49.61 11.94 N 11 S7 E 0.17 6375.28 4477.8 8.7 4425.71 N 681.01 E 8400.00 49.60 11.27 N 11 16 E 0.51 6391.48 4496.8 8.8 4444.36 N 684.84 E 8425.00 49.44 11.60 N 11 36 E 0.30 6407.71 4515.8 8.8 4463.00 N 688.61 E 8450.00 49.14 L1.69 - N 11, 42 E 0.31 6424.01 4534.7 8.8 4481.56 N 692.44 E 8475.00 .49.26 11.37 N 11 22 E 0.28 6440.35 4SS3.6 8.8 4500.10 N 696.22 E 8500.00 49.07 11.60 N 11 36 E 0.26 6456.70 4S72.S 8.8 4518.64 N 699.98 E 8S2S:00 48.96 11.22 N 11 13 E 0.31 6473.10 4591.4 8.8 4537.14 N 703.72 E 8SS0.00 48.78 11.03 N 11 2 E 0.23 6489.54 4610.2 8.8 4SSS.61 N 707.35 E 8S7S.00 48.79 11.68 N 11 41 E 0.49 6506.01 4629.0 8.8 4S74.OS N 711.OS E 8600.00 48.72 11.12 N 11 7 E 0.43 6S22.S0 4647.8 8.8 4592.48 N 714.77 E 8625.00 48.50 10.52 N 10 32 E O.SO 6539.03 4666.5 8.9 4610.90 N 718.29 E 8650.00 48.44 11.15 N 11 9 E 0.47 6SSS.60 4685.2 8.9 4629.28 N 721.81 E 8675.00 48.43 11.07 N 11 4 E 0.06 6572.19 4703.9 8.9 4647.63 N 725.42 E • • 14 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 25 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 8700.00 48.30 10.48 N 10 29 E 0.46 6588.80 4722.6 8.9 4665 99 N 728 91E 8725.00 48.47 10.09 N 10 5 E 0.34 6605.40 4741.3 8.9 . 4684.38 N . 732.25 E 8750.00 48.12 10.86 N 10 52 E 0.67 6622.03 4759.9 8.9 4702.73 N 735.64 E 8775.00 47.58 10.52 N 10 31 E 0.60 6638.81 4778.4 8.9 4720.95 N 739.08E 8800.00 47.87 9.59 N 9 35 E 0.75 6655.63 4796.9 8.9 4739.16 N 742.31E i 8825.00 47.86 10.17 N 10 10 E 0.43 6672.40 4815.5 8.9 4757.42 N 745.49E I, 8850.00 47.87 9.33 N 9 20 E 0.62 6689.17 4834.0 8.9 4775.69 N 748.63 E 8875.00 47.57 9.77 N 9 46 E 0.45 6705.99 4852.5 8.9 4793.93 N 751.70 E 8900.00 47.55 10.08 N 10 5 E 0.23 6722.86 4871.0 8.9 4812.11 N 754.88 E 8925.00 47.28 8.79 N 8 47 E 0.99 6739.78 4889.4 8.9 4830.27 N 757.90 E 8950.00 47.48 9.17 N 9 10 E 0.35 6756.71 4907.8 8.9 4848.44 N 760.77 E 8975.00 47.64 9.78 N 9 47 E 0.48 6773.58 4926.2 8.9 4866.63 N 763.81 E 9000.00 47.10 8.70 N 8 42 E 0.96 6790.51 4944.6 8.9 4884.79 N 766.76 E 9025.00 47.24 8.25 N 8 I S E 0.3.6 6807.51 4962.9 8.9 4902.92 N 769.47 E 9050.00 46.99 9.31 N 9 19 E 0.81 6824.52 4981.3 8.9 4921.02 N 772.26 E 9075.00 47.24 8:76 N 8 46 E 0.47 6841.53 4999.6 8.9 4939.11 N 775.14E • 9100.00 46.70 7.78 N 7 47 E 0.90 6858.59 5017.8 8.9 4957.20 N 777.77 E 9125.00 46.99 8.29 N 8 18 E 0.47 6875.69 5036.1 8.9 4975.26 N 780.32E II 9150.00 47.12 8.86 N 8 52 E 0.44 6892.72 5054.4 8.9 4993.35 N 783.05 E 9175.00 46.93 7.79 N 7 47 E 0.81 6909.76 5072.7 8.9 5011.45 N 785.70 E 9200.00 47.32 8.32 N 8 19 E 0.55 6926.77 5091.0 8.9 5029.59 N 788.26 E 9225.00 47.39 8.34 N 8 20 E 0.07 6943.71 5109.4 8.9 5047.79 N 790.92 E 9250.00 47.65 7.86 N 7 52 E 0.44 6960.59 5127.8 8.9 5066.04 N 793.52 E 9275.00 47.45 8.87 N 8 52 E 0.77 6977.46 5146.3 8.9 5084.29 N 796.21 E 15 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9300.00 47.61 7.92 N 7 55 E 0.72 6994.35 5164.7 8.9 5102.54 N 798.90 E 9325.00 47.81 7.65 N 7 39 E 0.28 7011.17 5183.2 8.9 5120.86 N 801.40 E 9350.00 47.94 8.66 N 8 40 E 0.76 7027.94 5201.7 8.9 5139.21 N 804.03 E 9375.00 48.02 7.74 N 7 45 E 0.69 7044.67 5220.3 8.9 5157.60 N 806.68 E 9400.00 48.35 7.34 N 7 20 E 0.44 7061.34 5238.9 8.9 5176.07 N 809.13 E 9425.00 48.27 8.59 N 8 35 E 0.94 7077.97 5257.6 8.9 5194.55 N 811.72 E 9450.00 48.20 7.47 N 7 28 E 0.84 7094.62 5276.2 8.9 5213.02 N 814.32 E 9475.00 48.68 7.10 N 7 6 E 0.55 7111.21 5294.9 8.9 5231.57 N 816.69 E 9500.00 48.50 8.67 N 8 40 E 1.19 7127.74 5313.7 8.9 5250.14 N 819.26 E 9525.00 48.20 7.23 N 7 14 E 1.11 7144.36 5332.4 8.9 5268.64 N 821.85 E 9550.00 48.78 7.62 N 7 37 E 0.65 7160.93 5351.1 8.9 5287.21 N 824.27 E 9575.00 49.02 7.83 N 7 50 E 0.29 7177.36 5369.9 8.9 5305.87 N 826.80 E 9600.00 48.52 6.86 N 6 52 E 0.88 7193.84 5388.7 8.9 5324.52 N 829.20 E 9625.00 48.92 7.44 N 7 27 E 0.59 7210.33 5407.5 8.8 5343.16 N 831.54 E 9650.00 49.30 7.92 N 7 55 E 0.53 7226.70 5426.4 8.8 5361.89 N 834.07 E 9675.00 48.83 - 6.88 N 6.:: ..53 E 0.91 7243.08.. .5445.3 8.8 5380.62 N 836.50 E 9700.00 49.49 6.86 N 6 52 E 0.66 7259.43 5464.2 8.8 5399.40 N 838.76 E 9725.00 49.03 7.95 N 7 57 E 0.94 7275.75 5483.1 8.8 5418.18 N 841.20 E 9750.00 49.45 7.17 N 7 10 E 0.72 7292.07 5502.0 8.8 5436.95 N 843.70 E 9775.00 49.90 6.55 N 6 33 E 0.65 7308.25 5521.1 8.8 5455.87 N 845.97 E 9800.00 49.66 7.77 N 7 46 E 0.96 7324.39 5540.2 8.8 5474.81 N 848.35 E 9825.00 50.00 7.64 N 7 38 E 0.35 7340.52 5559.3 8.8 5493.75 N 850.91 E 9850.00 49.75 6.29 N 6 18 E 1.06 7356.63 5578.4 8.8 5512.72 N 853.23 E 9875.00 49.84 7.58 N 7 35 E 0.98 7372.77 5597.4 8.8 5531.67 N 855.54 E •I •I 16 A Gyrodata Directional Survey BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9900.00 50.14 7.91 N 7 55 E 0.40 7388.84 5616.6 8.8 5550.64 N 858.12 E 9925.00 50.30 6.77 N 6 46 E 0.89 7404.84 5635.8 8.8 5569.70 N 860.57 E 9950.00 49.83 8.00 N 8 0 E 1.06 7420.89 5655.0 8.8 5588.71 N 863.03 E 9975.00 50.42 8.23 N 8 14 E 0.62 7436.92 5674.1 8.8 5607.70 N 865.74 E 10000.00 50.52 6.98 N 6 59 E 0.97 7452.83 5693.4 8.8 5626.81 N 868.30 E 10025.00 50.87 8.45 N 8 27 E 1.19 7468.66 5712.8 8.8 5645.98 N 870.89 E 10050.00 48.96 7.95 N 7 57 E 1.94 7484.76 5731.9 8.8 5664.91 N 873.62 E 10075.00 50.26 7.11 N 7 6 E 1.45 7500.96 5750.9 8.8 5683.79 N 876.12 E 10100.00 50.30 8.23 N 8 14 E 0.87 7516.93 5770.1 8.8 5702.85 N 878.68 E 10125.00 48.98 9.48 N 9 29 E 1.63 7533.12 5789.2 8.8 5721.67 N 881.61 E 10150.00 48.00 .11.72 N 11 43 E 1.94 7549.69 5807.9 8.8 5740.07 N 885.05 E 10175.00 47.10 14.36 N 14 22 E 2.15 7566.57 5826.3 8.8 5758.04 N 889.21 E 10200.00 46.72 15.37 N 15 22 E 0.83 7583.65 5844.4 8.8 5775.68 N 893.90 E 10225.00 47.04 17.36 N 17 21 E 1.49 7600.74 5862.5 8.8 5793.19 N 899.04 E 10250.00 46.30 18.77 N 18 46 E 1.27 7617.89 5880.5 8.8 5810.48 N 904.67 E 10275.00 47.25 ::18.26 N _ 18 16 E - 1.02. 7635.01, - 5898.4. 8.9 5827.75 N 910.46 E 10300.00 46.06 17.52 ` N I7 31 E 1.31 7652.17 5916.4 8.9 5845.05 N 916.04 E 10325.00 47.34 17.51 N 17 31 E 1.28 7669.32 5934.4 8.9 5862.40 N 921.52 E 10350.00 45.99 19.02 N 19 1 E 1.74 7686.48 5952.3 9.0 5879.67 N 927.21 E 10375.00 45.81 17.03 N 17 2 E 1.45 7703.87 5970.1 9.0 5896.74 N 932.77 E 10400.00 46.86 17.65 N 17 39 E 1.14 7721.14 5988.0 9.0 5914.00 N 938.16 E 10425.00 45.52 18.61 N 18 36 E 1.50 7738.44 6005.8 9.0 5931.1 S N 943.77 E 10450.00 45.73 16.67 N 16 40 E 1.40 7755.93 6023.4 9.1 5948.18 N 949.19 E 10475.00 46.59 18.04 N 18 2 E 1.31 7773.24 6041.3 9.1 5965.39 N 954.57 E 17 A Gyrodata Directional Survey BP .Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 10500.00 44.84 18.38 N 18 23 E 1.77 7790.70 6058.9 9.1 5982.39 N 960.16 E 10525.00 45.62 16.53 N 16 32 E 1.53 7808.31 6076.5 9.1 5999.32 N 965.48 E 10550.00 45.59 18.43 N 18 26 E 1.35 7825.80 6094.2 9.2 6016.35 N 970.84 E 10575.00 44.07 17.69 N 17 41 E 1.60 7843.53 6111.6 9.2 6033.11 N 976.31 E 10600.00 45.10 16.54 N 16 32 E 1.31 7861.33 6129.0 9.2 6049.88 N 981.47 E 10625.00 45.20 18.47 N 18 28 E 1.37 7878.96 6146.5 9.2 6066.78 N 986.80 E 10650.00 43.91 17.13 N 17 8 E 1.60 7896.78 6163.9 9.3 6083.48 N 992.16 E 10675.00 45.16 16.61 N 16 36 E 1.31 7914.60 6181.2 9.3 6100.26 N 997.25 E 10700.00 44.24 18.64 N 18 38 E 1.70 7932.37 6198.6 9.3 6117.02 N 1002.57 E 10725.00 43.73 16.43 N 16 26 E 1.62 7950.35 6215.8 9.3 6133.57 N 1007.80 E 10750.00 44.55 17.11 N 17 7 E 0.96 7968.30 6233.1 9.4 6150.24 N 1012.83 E 10775.00 44.07 18.53 N 18 32 E 1.10 7986.19 6250.4 9.4 6166.87 N 1018.17 E 10800.00 44.75 16.98 N 16 59 E 1.28 8004.05 6267.7 9.4 6183.53 N 1023.50 E 10825.00 43.29 16.51 N 16 30 E 1.49 8022.02 6284.9 9.4 6200.16 N 1028.51 E 10850.00 44.58 16.90 N 16 54 E 1.32 8040.02 6302.1 9.4 6216.78 N 1033.49 E 10875.00 44.52 15.25.....,.. N 15-: 15 E 0.95.:. 80.57.84 6319.5. 9.5 6233.50 N 1038.79 E 10900.00 44.47 16.90 N 16 54 E 0.95 8075.68 6336.8 9.5 6250.20 N 1044.08 E 10925.00 45.55 16.24 N 16 14 E 1.18 8093.35 6354.3 9.5 6267.14 N 1049.12 E 10950.00 44.36 17.85 N 17 51 E 1.64 8111.04 6371.9 9.5 6284.03 N 1054.29 E 10975.00 45.83 17.61 N 17 37 E 1.48 8128.69 6389.4 9.5 6300.90 N 1059.68 E 11000.00 45.59 16.07 N 16 4 E 1.13 8146.15 6407.1 9.6 6318.03 N 1064.87 E 11025.00 46.51 17.95 N 17 57 E 1.63 8163.50 6425.0 9.6 6335.24 N 1070.14 E 11050.00 44.82 17.20 N 17 12 E 1.77 8180.97 6442.7 9.6 6352.28 N 1075.54 E 11075.00 46.58 16.52 N 16 31 E 1.83 8198.43 6460.4 9.6 6369.40 N 1080.72 E 18 BP Exploration (Alaska) Lease: F-Pad Well: F-19A, 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska Job Number: AK1208G 173 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. 11100.00 45.69 18.93 N 18 S6 E 11125.00 45.83 16.48 N 16 29 E 11150.00 46.51 19.03 N 19 2 E 11175.00 45.29 17.37 N 17 22 E 11200.00 46.72 18.OS N 18 3 E 11225.00 45.81 19.29 N 19 18 E 11250.00 46.78 17.75 N 17 4S E 11275.00 46.22 19.67 N 19 40 E 11300.00 45.86 19.21 N 19 13 E 11325.00 46.96 19.42 N 19 2S E Final Station Closure: Distance: 6638.65 ft Az: 9.87 deg. DOGLEG VERTICAL CLOSURE HORIZONTAL SEVERITY DEPTH DIST. AZIMUTH COORDINATES deg./ feet feet deg. feet 2S ft. 1.95 8215.76 6478.3 9.7 6386.57 N 1086.21 E 1.76 8233.20 6496.0 9.7 6403.63 N 1091.65 E 1.96 82SO.S 1 6513.9 9.7 6420.80 N 1097.15 E 1.71 8267.91 6531.6 9.7 6437.85 N 1102.76 E 1.S 1 8285.28 6549.4 9.7 6454.98 N 1108.24 E 1.27 8302.56 6567.3 9.8 6472.09 N 1114.02 E 1.48 8319.83 6S8S.1 9.8 6489.23 N 1119.76 E 1.50 8337.04 6603.0 9.8 6506.41 N 112S.S7 E 0.49 8354.40 6620.8 9.8 6523.38 N 1131.56 E 1.11 8371.64 6638.7 9.9 6540.46 N 1137.SS E 19 EP Exploration (Alaska) Well: F-Pad F-19A 4-1/2" Tubing Location; Mast Unit, Prudhoe Bav, Alaska Interp Inrun Gyrodata AK1208G_173 DEFINITIVE 6000 5000 4000 .~ z 3000 O z 2000 1000 0 ~TTOM OLE ~CATED D: 1.132 .00 1-J 0 100 200 300 400 500 600 700 800 900 1000 1100 FASTING (ft) _BP Exploration (Alaska) Well: F-Pad F-19A 4-1/2" Tubing Location: Mast Unit, Prudhoe Bay, Alaska 5.0 4.5 4.0 3.5 N ~ 3.0 a~ .. G w 2.5 w C7 ~ 2.0 C7 O 1.5 1.0 0.5 0.0 Interp In run Gyrodata - AK1208G_173 DEFINITIVE BOTT M HOLE LOCA ED MD: 1325.00 •I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 MEASURED DEPTH (ft) Survey QC - RGS-CT Specification Sheet j~ SURVEY QUALITY CONTROL -SPECIFICATION DATA TNTTTAI TCATTAN Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERMeas ERTneo) 23 13.80 16.19 0.0007 24 13.80 16.00 0.0045 26 13.80 15.99 0.0091 27 13.80 16.30 0.0001 28 13.80 16.31 0.0246 29 13.80 16.20 0.0195 30 13.80 16.57 0.0050 31 13.80 16.40 0.0012 32 13.80 16.45 0.0015 33 13.80 16.36 0.0208 34 13.80 16.31 0.0109 Average 13.80 16.28 0.0089 Tolerance on Average* 0.0857 Standard Deviation 0.00 0.17 0.0085 Tolerance on St. Dev.** 0.1~ 0.2~ 0.0437 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * J[(COSA*SinI*O.1)`+n ns`~hr ** Tolerance on Standard Deviation of earthhorizontal rate difference tolerance is given by (1/CosI) *J[(COSA*SinI*0.1)2+(0.082/(n-1))J ~/hr IIRTFT TIINFC Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 1323.34 4495.61 50.61 4.47 0.000 -0.000 0.000 0.001 2 1063.86 6294.10 51.79 9.73 -0.003 0.003 -0.006 0.006 3 1411.38 8891.90 47.39 10.10 -0.006 0.006 -0.005 0.004 4 1388.95 11334.04 46.93 19.41 -0.003 0.003 -0.004 0.003 5 1502.55 8934.22 47.39 8.54 0.001 -0.000 0.002 -0.002 6 754.16 8734.67 48.64 10.18 -0.000 0.001 -0.001 0.001 7 1195.33 6591.43 52.22 10.93 0.002 -0.001 0.002 -0.002 8 1317.52 4492.72 50.65 4.32 0.000 0.000 0.005 -0.005 9 1393.98 2295.00 14.10 16.06 0.000 -0.000 0.000 0.001 Average -0.001 0.001 -0.001 0.001 Standard Deviation 0.002 0.002 0.003 0.003 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033/hr 0.033/hr 0.033/hr SURV-Q367 (OPS SUR-MA-003) 19°1 Nov 03 /Rev 15 Page 1 of 10 AK12O8G_373 Survey QC - RGS-CT Specification Sheet Y ~v INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * Outrun * Difference Inrun * Outrun * Difference 100.00 0.15 0.13 0.02 309.08 126.97 -177.89 200.00 0.33 0.17 0.16 172.40 188.20 -15.81 300.00 0.41 0.21 0.20 220.38 244.81 -24.44 400.00 0.53 0.35 0.18 196.71 203.48 -6.77 500.00 0.56 0.48 0.08 184.31 163.43 20.88 600.00 0.36 0.45 -0.09 168.08 154.78 13.30 700.00 0.24 0.41 -0.17 164.54 146.02 18.52 800.00 0.50 0.32 0.18 172.34 134.50 37.84 900.00 0.14 0.22 -0.09 137.65 123.33 14.32 1000.00 0.12 0.25 -0.13 120.57 119.77 0.80 1100.00 0.37 0.27 0.10 166.68 116.56 50.13 1200.00 0.07 0.27 -0.20 196.39 120.30 76.09 1300.00 0.10 0.36 -0.25 .222.61 121.36 101.25 1400.00 0.81 2.24 -1.43 8.93 68.81 -59.87 1500.00 3.69 4.06 -0.37 17.65 18.62 -0.97 1600.00 4.96 4.61 0.34 13.42 15.71 -2.28 1700.00 5.12 5.22 -0.11 14.53 13.72 0.82 1800.00 5.85 6.87 -1.02 23.17 29.38 -6.21 1900.00 8.32 8.48 -0.16 42.96 44.02 -1.07 2000.00 9.12 9.43 -0.31 43.69 40.73 2.96 2100.00 10.45 10.42 0.03 36.58 37.05 -0.47 2200.00 11.91 12.30 -0.39 21.74 26.28 -4.53 2300.00 14.25 14.33 -0.08 15.49 15.57 -0.08 2325.00 15.03 15.06 -0.03 14.03 14.22 -0.19 2350.00 15.71 15.74 -0.03 12.67 12.46 0.21 2375.00 16.00 16.03 -0.03 12.44 12.15 0.29 2400.00 16.47 16.48 -0.01 12.09 11.85 0.25 2425.00 16.88 16.97 -0.08 12.15 11.82 0.33 2450.00 17.35 17.37 -0.02 11.86 11.63 0.24 2475.00 17.95 18.01 -0.06 11.72 11.47 0.24 2500.00 18.46 18.51 -0.05 11.52 11.28 0.25 2525.00 19.16 19.21 -0.05 11.40 11.16 0.25 2550.00 19.77 19.85 -0.08 11.23 10.98 0.24 2575.00 20.65 20.75 -0.11 10.93 10.69 0.24 2600.00 21.38 21.43 -0.04 10.67 10.45 0.22 2625.00 21.77 21.81 -0.05 10.58 10.36 0.22 2650.00 22.25 22.27 -0.01 10.34 10.13 0.21 2675.00 22.50 22.51 -0.01 10.34 10.17 0.17 2700.00 22.74 22.76 -0.02 10.34 10.10 0.23 2725.00 23.35 23.39 -0.05 10.23 10.06 0.17 2750.00 23.69 23.69 -0.00 10.26 10.08 0.19 2775.00 24.15 24.23 -0.09 10.19 10.01 0.18 2800.00 25.09 25.25 -0.16 9.91 9.69 0.23 SURV-Qi67 (OPS S UR-M0.-003) 19`" Nov 03 /Rev 15 Page 2 of 10 AK1208G_373 Survey QC - RGS-CT Specification Sheet 2825.00 26.53 26.66 -0.12 9.04 8.82 0.22 2850.00 27.56 27.64 -0.08 8.73 8.55 0.18 2875.00 28.24 28.34 -0.10 8.62 8.44 0.19 2900.00 29.35 29.44 -0.10 8.56 8.40 0.16 2925.00 30.15 30.22 -0.07 8.74 8.60 0.13 2950.00 30.66 30.69 -0.03 8.90 8.79 0.11 2975.00 31.18 31.21 -0.03 9.29 9.19 0.10 3000.00 31.73 31.78 -0.05 9.79 9.76 0.03 3025.00 32.34 32.37 -0.03 10.33 10.20 0.13 3050.00 33.03 33.10 -0.08 10.16 9.97 0.19 3075.00 34.35 34.51 -0.16 8.70 8.42 0.28 3100.00 35.48 35.55 -0.07 7.67 7.51 0.16 3125.00 36.14 36.19 -0.05 7.30 7.15 0.15 3150.00 36.76 36.83 -0.07 6.60 6.35 0.24 3175.00 37.56 37.68 -0.12 5.64 5.46 0.18 3200.00 38.88 39.00 -0.12 4.92 4.72 0.19 3225.00 39.62 39.70 -0.08 4.62 4.49 0.14 3250.00 40.61 40.72 -0.11 4.29 4.14 0.15 3275.00 41.35 41.44 -0.09 4.23 4.10 0.12 3300.00 42.10 42.20 -0.10 4.24 4.12 0.12 3325.00 42.85 42.95 -0.11 4.22 4.09 0.13 3350.00 43.54 43.64 -0.10 4.21 4.09 0.12 3375.00 44.24 44.33 -0.08 4.24 4.11 0.13 3400.00 44.98 45.09 -0.11 4.21 4.10 0.11 3425.00 45.86 45.96 -0.10 4.25 4.13 0.12 3450.00 46.57 46.64 -0.07 4.27 4.13 0.14 3475.00 47.27 47.35 -0.09 4.28 4.16 0.12 3500.00 48.07 48.17 -0.10 4.36 4.26 0.09 3525.00 48.70 48.79 -0.10 4.40 4.28 0.11 3550.00 49.29 49.35 -0.06 4.40 4.28 0.12 3575.00 49.87 49.94 -0.07 4.39 4.28 0.11 3600.00 50.51 50.56 -0.06 4.42 4.31 0.11 3625.00 51.02 51.08 -0.07 4.41 4.29 0.12 3650.00 51.36 51.28 0.08 4.42 4.28 0.14 3675.00 51.15 51.15 0.01 4.49 4.36 0.14 3700.00 51.17 51.12 0.05 4.50 4.36 0.14 3725.00 51.24 51.23 0.01 4.52 4.40 0.12 3750.00 51.10 51.12 -0.03 4.53 4.40 0.14 3775.00 51.33 51.28 0.05 4.52 4.42 0.11 3800.00 51.18 51.14 0.04 4.49 4.36 0.14 3825.00 51.21 51.24 -0.03 4.49 4.36 0.13 3850.00 51.25 51.22 0.04 4.48 4.37 0.11 3875.00 51.17 51.18 -0.01 4.55 4.41 0.14 3900.00 51.29 51.19 0.11 4.58 4.45 0.13 3925.00 51.04 51.05 -0.02 4.62 4.50 0.12 SURV-Qi67 (OPS SUR-MA-003) Ig`" Nov 03 /Rev IS Page 3 of 10 AK1208G_173 Survey QC - RGS-CT Specification Sheet 3950.00 51.14 51.11 0.03 4.68 4.54 0.14 3975.00 51.12 51.13 -0.00 4.68 4.54 0.14 4000.00 51.03 51.01 0.02 4.69 4.54 0.14 4025.00 51.09 51.04 0.05 4.70 4.58 0.13 4050.00 51.05 51.04 0.02 4.70 4.58 0.13 4075.00 50.95 50.89 0.05 4.67 4.54 0.12 4100.00 51.14 51.14 -0.01 4.66 4..54 0.12 4125.00 50.98 50.98 -0.00 4.63 4.51 0.12 4150.00 51.08 50.99 0.09 4.64 4.49 0.15 4175.00 51.05 51.06 -0.02 4.59 4.44 0.15 4200.00 50.93 50.89 0.04 4.65 4.51 0.14 4225.00 51.15 51.12 0.03 4.60 4.45 0.15 4250.00 51.02 51.02 0.00 4.65 4.49 0.16 4275.00 51.11 50.96 0.15 4.62 4.49 0.13 4300.00 50.97 50.94 0.03 4.63 4.49 0.14 4325.00 50.41 50.32 0.08 4.60 4.49 0.11 4350.00 50.67 50.71 -0.04 4.62 4.47 0.15 4375.00 51.04 51.08 -0.04 4.63 4.46 0.17 4400.00 51.18 51.01 0.17 4.57 4.43 0.14 4425.00 51.06 51.06 0.00 4.58 4:44 0.14 4450.00 50.97 50:89 0.07 4.55 4.41 0.13 4475.00 50.64 50.62 0.02 4.49 4.34 0.15 4500.00 50.65 50.59 0.07 4.46 4.31 0.15 4525.00 50.63 50.57 0.06 4.46 4.29 0.16 4550.00 50.65 50.62 0.04 4.49 4.33 0.16 4575.00 50.65 50.57 0.09 4.51 4.33 0.18 4600.00 50.52 50.42 0.09 4.45 4.28 0.18 4625.00 50.37 50.35 0.02 4.49 4.31 0.18 4650.00 50.45 50.36 0.08 4.50 4.35 0.15 4675.00 50.44 50.43 0.01 4.53 4.34 0.19 4700.00 50.63 50.60 0.03 4.50 4.31 0.19 4725.00 50.89 50.84 0.04 4.56 4.36 0.19 4750.00 50.52 50.45 0.07 4.54 4.36 0.19 4775.00 50.38 50.28 0.10 4.56 4.39 0.17 4800.00 50.46 50.42 0.04 4.51 4.33 0.18 4825.00 50.20 50.16 0.04 4.49 4.29 0.20 4850.00 50.40 50.31 0.08 4.44 4.26 0.19 4875.00 50.37 50.36 0.02 4.43 4.24 0.18 4900.00 50.17 50.11 0.07 4.45 4.26 0.19 4925.00 50.48 50.43 0.05 4.42 4.23 0.19 4950.00 50.09 50.04 0.06 4.48 4.29 0.19 4975.00 50.36 50.24 0.11 4.44 4.27 0.16 5000.00 50.46 50.44 0.01 4.45 4.25 0.20 5025.00 50.31 50.20 0.11 4.50 4.32 0.19 5050.00 50.24 50.16 0.07 4.56 4.38 0.18 SURV-Qi67 (OPS SUR-MA-003) 19M Nov 03 /Rev 1S Page 4 of 10 ~ AK32O8G_173 Survey QC - RGS-CT Specification Sheet 5075.00 49.98 49.90 0.08 4.62 4.42 0.19 5100.00 50.20 50.12 0.08 4.71 4.53 0.18 5125.00 50.14 50.09 0.05 4.67 4.50 0.17 5150.00 49.90 49.79 0.11 4.71 4.54 0.17 5175.00 50.19 50.16 0.04 4.71 4.51 0.19 5200.00 50.13 50.08 0.06 4.68 4.50 0.18 5225.00 50.10 49.98 0.12 4.71 4.54 0.16 5250.00 49.84 49.79 0.05 4.74 4.57 0.17 5275.00 49.75 49.66 0.09 4.84 4.63 0.22 5300.00 49.99 49.91 0.08 4.84 4.63 0.20 5325.00 49.50 49.46 0.04 4.87 4.66 0.21 5350.00 49.96 49.86 0.10 5.02 4.86 0.16 5375.00 49.88 49.82 0.06 5.30 5.14 0.16 5400.00 49.94 49.89 0.05 5.79 5.61 0.18 5425.00 50.26 50.18 0.08 6.13 5.94 0.19 5450.00 50.20 50.15 0.06 6.46 6.28 0.18 5475.00 50.27 50.20 0.07 6.67 6.50 0.17 5500.00 50.32 50.26 0.06 6.86 6.67 0.20 5525.00 49.99 49.88 0.10 6.98 6.79 0.18 5550.00 50.31 50.27 0.03 7.10 6.90 0.19 5575.00 50.36 50.35 0.01 7.42 7.25 0.18 5600.00 50.87 50.76 0.11 7.81 7.64 0.16 5625.00 51.05 51.04 0.01 8.05 7.84 0.21 5650.00 51.48 51.43 0.05 8.07 7.89 0.18 5675.00 51.24 51.18 0.06 8.05 7.87 0.18 5700.00 51.12 51.07 0.05 8.10 7.92 0.19 5725.00 51.25 51.14 0.11 8.17 7.99 0.18 5750.00 51.36 51.32 0.04 8.30 8..13 0.17 5775.00 51.42 51.37 0.06 8.48 8.33 0.15 5800.00 51.83 51.82 0.02 8.74 8.56 0.18 5825.00 52.09 52.06 0.03 8.88 8.72 0.17 5850.00 52.28 52.16 0.12 9.01 8.83 0.17 5875.00 52.32 52.28 0.04 9.05 8.86 0.19 5900.00 52.33 52.29 0.04 9.09 8.90 0.19 5925.00 52.32 52.24 0.08 9.01 8.82 0.19 5950.00 51.94 51.91 0.03 8.98 8.80 0.18 5975.00 51.91 51.81 0.10 8.97 8.78 0.19 6000.00 51.50 51.42 0.08 8.92 8.72 0.20 6025.00 51.91 51.88 0.03 8.88 8.70 0.18 6050.00 52.01 51.96 0.05 8.87 8.70 0.17 6075.00 51.69 51.56 0.13 8.96 8.80 0.16 6100.00 51.36 51.30 0.05 9.06 8.90 0.17 6125.00 51.71 51.66 0.05 9.05 8.88 0.17 6150.00 51.84 51.80 0.04 9.07 8.88 0.19 6175.00 52.04 51.98 0.06 9.22 9.05 0.17 SURV-Qi67 (OPS SUR-MA-003) 19 ~" Nov 03 /Rev 35 Page S of 10 AK1208G_373 Survey QC - RGS-CT Specification Sheet Y 6200.00 51.55 51.48 0.07 9.36 9.20 0.16 6225.00 51.96 51.92 0.05 9.64 9.50 0.14 6250.00 51.59 51.53 0.06 9.78 9.65 0.14 6275.00 51.81 51.77 0.04 9.76 9.60 0.16 6300.00 51.79 51.77 0.02 9.68 9.52 0.17 6325.00 51.93 51.91 0.02 9.69 9.51 0.17 6350.00 52.11 52.10 0.01 9.72 9.55 0.17 6375.00 52.34 52.26 0.08 9.90 9.75 0.15 6400.00 52.17 52.12 0.05 10.50 10.38 0.12 6425.00 51.82 51.77 0.05 11.11 10.96 0.15 6450.00 52.14 52.12 0.02 11.31 11.15 0.16 6475.00 51.87 51.79 0.07 11.21 11.04 0.18 6500.00 51.96 51.92 0.04 11.15 10.98 0.17 6525.00 52.36 52.35 0.01 11.13 10.96 0.17 6550.00 52.33 52.29 0.05 11.16 10.98 0.18 6575.00 52.50 52.45 0.04 11.16 10.98 0.18 6600.00 52.29 52.28 0.01 11.11 10.93 0.17 6625.00 52.58 52.45 0.13 11.23 11.07 0.15 6650.00 52.72 52.72 -0.00 11.36 11.19 0.17 6675.00 52.58 52.54 0.03 11.43 11.26 0.17 6700.00 52.87 .52.84 0.03 11.32 11.14 0.18 6725.00 52.78 52.75 0.03 11.28 11.11 0.18 6750.00 52.56 52.48 0.08 11.24 11.07 0.17 6775.00 52.70 52.67 0.03 11.22 11.03 0.19 6800.00 52.51 52.50 0.02 11.29 11..14 0.15 6825.00 52.67 52.64 0.02 11.41 11.26 0.14 6850.00 52.58 52.55 0.03 11.50 11.32 0.18 .6875.00 52.55 52.50 0.05 11.48 11.32 0.16 6900.00 52.54 52.50 0.03 11.59 11.42 0.17 6925.00 52.48 52.45 0.03 11.63 11.46 0.17 6950.00 52.54 52.52 0.02 11.67 11.51 0.17 6975.00 52.41 52.37 0.04 11.63 11.46 0.17 7000.00 52.46 52.40 0.05 11.69 11.55 0.15 7025.00 52.39 52.38 0.01 11.71 11.55 0.16 7050.00 52.22 52.15 0.07 11.72 11.56 0.16 7075.00 52.36 52.36 0.00 11.85 11.70 0.16 7100.00 52.23 52.23 0.01 11.88 11.72 0.16 7125.00 52.27 52.18 0.09 11.91 11.77 0.14 7150.00 52.27 52.27 0.00 11.98 11.81 0.17 7175.00 52.05 52.02 0.03 11.92 11.74 0.18 7200.00 52.29 52.21 0.08 11.87 11.71 0.16 7225.00 52.03 52.01 0.02 11.95 11.77 0.18 7250.00 52.03 52.00 0.03 11.88 11.71 0.17 7275.00 52.10 52.04 0.06 11.91 11.77 0.15 7300.00 51.84 51.82 0.02 11.94 11.79 0.15 SURV-Qi67 (OPS SUR-MA-003) 19~" N ov 03 /Rev 35 Page 6 of 10 AK12086_373 Survey QC - RGS-CT Specification Sheet ~" 7325.00 51.86 51.78 0.08 12.05 11.91 0.14 7350.00 51.17 51.15 0.02 12.01 11.85 0.16 7375.00 51.88 51.86 0.02 11.91 11.76 0.15 7400.00 51.48 51.46 0.03 11.92 11.75 0.17 7425.00 51.37 51.30 0.07 12.01 11.88 0.14 7450.00 51.10 51.04 0.06 12.24 12.10 0.13 7475.00 50.92 50.90 0.03 12.15 11.99 0.16 7500.00 51.24 51.21 0.03 12.11 11.94 0.16 7525.00 51.19 51.18 0.02 12.07 11.91 0.16 7550.00 50.75 50.69 0.06 12.12 11.98 0.14 7575.00 50.70 50.64 0.07 12.16 12.01 0.14 7600.00 50.56 50.56 0.00 12.16 11.99 0.16 7625.00 50.93 50.90 0.03 12.10 11.93 0.16 7650.00 51.34 51.34 0.01 12.01 11.85 0.16 7675.00 51.17 51.12 0.06 12.09 11.95 0.13 7700.00 50.93 50.87 0.06 11.98 11.83 0.14 7725.00 50.97 50.95 0.02 12.04 11.90 0.14 7750.00 50.72 50.65 0.07 12.17 12.03 0.14 7775.00 50.85 50.83 0.02 12.08 11.92 0.15 7800.00 50.72 50.72 0.00 12.06 11.91 0.15 7825.00 50.79 50.74 0.06 12.22 12.07 0.14 7850.00 50.71 50.71 0.00 12.08 11.92 0.16 7875.00 51.01 51.00 0.02 11.94 11.79 0.15 7900.00 51.10 51.04 0.06 12.10 11.98 0.12 7925.00 50.54 50.52 0.02 12.11 11.94 0.17 7950.00 50.79 50.77 0.02 11.97 11.80 0.17 7975.00 50.84 50.80 0.04 11.96 11.81 0.15 8000.00 50.64 50.62 0.03 12.09 11.96 0.13 8025.00 50.79 50.74 0.04 12.01 11.88 0.13 8050.00 50.59 50.58 0.01 11.93 11.82 0.12 8075.00 50.73 50.67 0.07 12.22 12.11 0.11 8100.00 50.53 50.52 0.02 12.05 11.90 0.15 8125.00 50.37 50.32 0.05 11.86 11.76 0.10 8150.00 50.28 50.28 0.00 11.88 11.76 0.12 8175.00 50.28 50.24 0.04 11.93 11.78 0.14 8200.00 50.31 50.23 0.08 12.04 11.93 0.12 8225.00 50.24 50.22 0.02 11.66 11.50 0.16 8250.00 49.96 49.93 0.03 11.54 11.43 0.11 8275.00 49.92 49.88 0.03 12.01 11.90 0.10 8300.00 49.77 49.76 0.01 11.90 11.77 0.13 8325.00 49.78 49.74 0.05 11.44 11.33 0.11 8350.00 49.74 49.72 0.02 11.80 11.70 0.10 8375.00 49.61 49.58 0.03 11.94 11.82 0.13 8400.00 49.60 49.57 0.03 11.27 11.14 0.13 8425.00 49.44 49.41 0.02 11.60 11.51 0.10 SURV-Q767 (OPS SUR-MA-003) 19 th Nov 03 /Rev 15 Page 7 of 10 AK3208G_773 Survey QC - RGS-CT Specification Sheet ~j'~/ _~ 8450.00 49.14 49.13 0.01 11.69 11.56 0.13 8475.00 49.26 49.22 0.04 11.37 11.26 0.11 8500.00 49.07 49.03 0.04 11.60 11.52 0.08 8525.00 48.96 48.95 0.01 11.22 11.11 0.12 8550.00 48.78 48.75 0.03 11.03 10.93 0.10 8575.00 48.79 48.76 0.03 11.68 11.60 0.08 8600.00 48.72 48.68 0.04 11.12 11.04 0.09 8625.00 48.50 48.47 0.03 10.52 10.42 0.10 8650.00 48.44 48.42 0.02 11.15 11.07 0.08 8675.00 48.43 48.41 0.02 11.07 10.98 0.09 8700.00 48.30 48.25 0.05 10.48 10.41 0.07 8725.00 48.47 48.46 0.00 10.09 10.02 0.07 8750.00 48.12 48.19 -0.07 10.86 10.70 0.16 8775.00 47.58 47.58 0.00 10.52 10.44 0.09 8800.00 47.87 47.86 0.01 9.59 9.53 0.06 8825.00 47.86 47.85 0.01 10.17 10.12 0.05 8850.00 47.87 47.84 0.03 9.33 9.30 0.03 8875.00 47.57 47.53 0.03 9.77 9.75 0.02 8900.00 47.55 47.53 0.02 10.08 10.02 0.06 8925.00 47.28 47.25 0.03 8.79 8.70 0.08 8950.00 47.48 47.43 0.04 9.17 9.15 0.02 8975.00 47.64 47.60 0.04 9.78 9.70 0.08 9000.00 47.10 47.05 0.05 8.70 8.54 0.17 9025.00 47.24 47.20 0.04 8.25 8.23 0.02 9050.00 46.99 46.99 0.00 9.31 9.28 0.03 9075.00 47.24 47.14 0.10 8.76 8.65 0.11 9100.00 46.70 46.72 -0.02 7.78 7.65 0.13 9125.00 46.99 46.95 0.03 8.29 8.26 0.04 9150.00 47.12 47.11 0.02 8.86 8.78 0.08 9175.00 46.93 46.90 0.03 7.79 7.66 0.13 9200.00 47.32 47.31 0.01 8.32 8.30 0.01 9225.00 47.39 47.36 0.04 8.34 8.25 0.09 9250.00 47.65 47.62 0.03 7.86 7.87 -0.01 9275.00 47.45 47.45 -0.01 8.87 8.77 0.10 9300.00 47.61 47.55 0.05 7.92 7.79 0.13 9325.00 47.81 47.79 0.02 7.65 7.59 0.06 9350.00 47.94 47.92 0.02 8.66 8.58 0.08 9375.00 48.02 47.99 0.03 7.74 7.67 0.08 9400.00 48.35 48.32 0.02 7.34 7.30 0.04 9425.00 48.27 48.28 -0.00 8.59 8.54 0.05 9450.00 48.20 48.15 0.04 7.47 7.39 0.08 9475.00 48.68 48.66 0.02 7.10 7.03 0.07 9500.00 48.50 48.47 0.03 8.67 8.64 0.03 9525.00 48.20 48.17 0.03 7.23 7.09 0.14 9550.00 48.78 48.75 0.03 7.62 7.64 -0.02 SURV-Q167 (OPS SUR-MA-003) 19tl' Nov 03 /Rev 15 Page 8 of 10 AK1208G_173 Survey QC - RGS-CT Specification Sheet ~' ~~ 9575.00 49.02 49.00 0.02 7.83 7.77 0.06 9600.00 48.52 48.49 0.03 6.86 6.75 0.11 9625.00 48.92 48.89 0.02 7.44 7.37 0.07 9650.00 49.30 49.30 0.00 7.92 7.82 0.10 9675.00 48.83 48.78 0.04 6.88 6.80 0.08 9700.00 49.49 49.46 0.02 6.86 6.77 0.09 9725.00 49.03 49.00 0.03 7.95 7.86 0.08 9750.00 49.45 49.43 0.02 7.17 7.10 0.08 9775.00 49.90 49.89 0.01 6.55 6.48 0.08 9800.00 49.66 49.64 0.03 7.77 7.73 0.04 9825.00 50.00 49.97 0.03 7.64 7.61 0.03 9850.00 49.75 49.76 -0.01 6.29 6.21 0.08 9875.00 49.84 49.80 0.04 _ 7.58 7.54 0.04 9900.00 50.14 50.11 0.03 7.91 7.82 0.09 9925.00 50.30 50.28 0.02 6.77 6.68 0.09 9950.00 49.83 49.79 0.04 8.00 7.91 0.09 9975.00 50.42 50.39 0.03 8.23 8.17 0.06 10000.00 50.52 50.47 0.05 6.98 6.89 0.09 10025.00 50.87 50.81 0.06 8.45 8.44 0.01 10050.00 48.96 48.92 0.04 7.95 7.89 0.07 10075.00 50.26 50.28 -0.01 7.11 7.03 0.08 10100.00 50.30 50.27 0.04 8.23 8.11 0.12 10125.00 48.98 48.95 0.03 9.48 9.38 0.10 10150.00 48.00 47.97 0.03 11.72 11.64 0.08 10175.00 47.10 47.04 0.06 14.36 14.32 0.04 10200.00 46.72 46.71 0.01 15.37 15.24 0.12 10225.00 47.04 47.01 0.03 17.36 17.28 0.07 10250.00 46.30 46.31 -0.01 18.77 18.67 0.09 10275.00 47.25 47.24 0.01 18.26 18.20 0.06 10300.00 46.06 46.05 0.01 17.52 17.41 0.11 10325.00 47.34 47.35 -0.01 17.51 17.42 0.09 10350.00 45.99 45.94 0.05 19.02 18.98 0.04 10375.00 45.81 45.78 0.03 17.03 16.95 .0.08 10400.00 46.86 46.87 -0.01 17.65 17.58 0.07 10425.00 45.52 45.51 0.02 18.61 18.58 0.03 10450.00 45.73 45.71 0.02 16.67 16.59 0.08 10475.00 46.59 46.61 -0.02 18.04 17.90 0.14 10500.00 44.84 44.80 0.04 18.38 18.30 0.07 10525.00 45.62 45.64 -0.02 16.53 16.44 0.09 10550.00 45.59 45.64 -0.06 18.43 18.28 0.14 10575.00 44.07 44.07 -0.00 17.69 17.75 -0.06 10600.00 45.10 45.04 0.06 16.54 16.41 0.13 10625.00 45.20 45.32 -0.12 18.47 18.31 0.16 10650.00 43.91 . 43.90 0.00 17.13 17.14 -0.02 10675.00 45.16 45.14 0.02 16.61 16.48 0.12 SURV-Qi67 (OPS SUR-MA-003) 19`b Nov 03 /Rev 1S Page 9 of 10 AK1208G_173 Survey QC - RGS-CT Specification Sheet 10700.00 44.24 44.27 -0.03 18.64 18.60 0.04 10725.00 43.73 43.67 0.05 16.43 16.37 0.05 10750.00 44.55 44.68 -0.12 17.11 16.97 0.14 10775.00 44.07 44.02 0.04 18.53 18.43 0.10 10800.00 44.75 44.77 -0.03 16.98 16.94 0.04 10825.00 43.29 43.25 0.04 16.51 16.53 -0.02 10850.00 44.58 44.62 -0.04 16.90 16.78 0.12 10875.00 44.52 44.40 0.12 18.25 18.19 0.06 10900.00 44.47 44.50 -0.03 16.90 16.89 0.01 10925.00 45.55 45.51 0.04 16.24 16.13 0.11 10950.00 44.36 44.40 -0.03 17.85 17.60 0.25 10975.00 45.83 45.83 0.00 17.61 17.73 -0.12 11000.00 45.59 45.50 0.10 16.07 16.05 0.02 11025.00 46.51 46.54 -0.04 17.95 17.80 0.15 11050.00 44.82 44.80 0.02 17.20 17.40 -0.20 11075.00 46.58 46.45 0.13 16.52 16.28 0.23 11100.00 45.69 45.79 -0.10 18.93 18.90 0.03 11125.00 45.83 45.64 0.19 16.48 16.54 -0.06 11150.00 46.51 46.65 -0.14 19.03 18.76 0.27 11175.00 45.29 45.15 0.14 17.37 17.52 -0.15 11200.00 46.72 46.81 -0.10 18.05 17.78 0.27 11225.00 45.81 45.88 -0.07 19.29 19.53 -0.23 11250.00 46.78 46.63 0.16 17.75. 17.54 0.21 11275.00 46.22 46.26 -0.05 19.67 19.61 0.06 11300.00 45.86 45.90 -0.04 19.21 19.20 0.02 11325.00 46.96 46.81 0.15 19.42 19.41 0.01 Average 0.0092 0.1320 Standard Deviation 0.1163 0.0684 Tolerance for both the Average and the Standard Deviation Casing 0.3~ Drill i e 0.3~ Casing 0.5~ Drill i e 0.75 ~` lncllnation and Azimum mterpoiatea to same aeptns as snown. SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 1S Page 10 of 10 AK3208G_373 S Survey QC - RGS-CT Analysis Sheet .. SURVEY QUALITY CONTROL -DATA ANALYSIS n CCG~CwI f•G CVCTGI~AC Grid S stem Grid Correction 0.00 Azimuth reference: Grid True North TRUE NORTH Vertical reference: RKB/MSL/Other RKB If other ive details TTC Awl tlATll De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.3355 Az. Ref: Grid True Grid Corrected Y N? Descri tion CALIBRATION Tool Number 6079 Calibration Date 29 Jun 2008 OPERATING TEMPERA Calibration ran a From 50.83 To 117.77 C;vrn nneraYina ranoe From 53.97 To 98.86 Spec' -Within Calibration range eTCI n ~nl 1 recr in.,i....~ua .,.. f;~o~ rr~~irti~roe ~nthon not nnccihla innnt rnll tact riata narfnrmatl affer return to hasel Cal value Pre "ob offset ost ~ob offset Abs dif.cal. ost Abs dif. re. ost Sec' Accel Scale 0.000000 0.000000 N A Cal Post - 0.00015 Mass Unbalance 0.00 0.00 N A Pre Post - 0.4° hr De th A rox 2298.16 No of stns 11 Sec' -Min No. - 6 Azimuth Mean 16.28 Std deviation 0.17 Sec' - Azi SD 0.2° Inclination Mean 13.80 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.01 Std deviation 0.01 Sec' -See 167 DRIFT TUNE Residual x ovro bias Mean 0.001 Std dev' 0.002 Spec's -Mean and SD - 0.333 hr Residual v ovro bias Mean 0.001 Std dev' 0.003 Spec's -Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 9.51 Sec' - 400 sec u /n~~T PA"An AnTCAw1 /w9T~ wllw TC Twl /`• i1C0\ Inclination Difference Mean 0.01 Std dev' 0.12 Sec's -Casin 0.3° Drill i e 0.3° Azimuth Difference Mean 0.13 Std dev' 0.07 Sec's -Casin 0.5° Drill i e 0.75° Lateral Diver ence 1000 0.48 Sec - 5.0 1000 Vertical Diver ence/1000 0.19 Sec' - 2.0/1000 n~nru ne~wlTS nl Wireline Com an Schlumber er Line a 15 32 Encoder SF Schlumber er Max De th TD 11325 CCL Corrected Checked Zero De th Ri u RKB at 71.38 AMSL Rezero De th -6 FT Given u ~oint de th 11276.8 Measured PJ 11275.7 Strech cor. At TD divided b TD/1000 .53 Sec' - 1.5 1000 Dif. Between ri u and rezero de the divided b TD 1000 .62 Sec' - 2.0 1000 Dif. Between iven and meas de th divided b meas 1000 .10 Sec' - 2.0 1000 SURV-Q165 (OPS SUR-MA-010) 22nd Jan 2004 /Revision 20 Page 1 of i AK3208G_173 Survey QC - RGS-CT Acceptance Sheet ~'~ ®~ FTFI rf ANr) SIIRVFY TNFnRMATT[)N Operator BP ALASKA Field /Platform NONE Well Number PBU F PAD F-19A Survey section From 2295.00 ft. to 11334.00 ft. Date 12/16/2008 Gyrodata Job No AK1208G_173 Gyrodata Surveyors ,TAMES BUTLER Job Objective High Accuracy Gyro Survey SIIRVFY PERFARMONCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either Inrun or outrun meet all other C arameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q366 (OPS SUR-MA-003) 13`" Nov 03 /Revision 12 Page 1 of 1 AK1208G_173 ~ ~ ~~1~~~~ ~~Ir' i~~l p~~ ,°~F(Gl Greg Hobbs Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 ALASSA OIL A1~TD GAS C01~TSERQA~'IO1DT COMI-IISSIOH SARAH PAL/N, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-19A BP Exploration Alaska Inc. Permit No: 208-173 Surface Location: 284' FNL, 2192' FEL, SEC. 02, T11N, R13N, UM Bottomhole Location: 2676' FSL, 44' FEL, SEC. 34, T12N, R13E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, aniel T. Seamount, Jr. Chair DATED this day of November, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA /~ ALASK~L AND GAS CONSERVATION COMMISS~ ~"ii PERMIT TO DRILL /t~ 20 AAC 25.005 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ ExQloratorv ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®DevelopmeM Oil ^ Single Zone 1 c. S ecity if well is proposed far:- ~Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU F-19A 3. Address: P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Proposed Depth: MD 14023' TVD 8704' 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028280, 028277, 028278 Pool FEL, SEC. 02, T11 N, R13E, UM 2845 FNL, 2192 Top of Productive Horizon: UM 3180' FEL T12N R13E 2818' FSL SEC. 35 8. Land Use Permit: 13. Approximate Spud Date: January 24, 2009 , , , , , Total Depth: 2676' FSL, 44' FEL, SEC. 34, T12N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 5,100' 4b. Location of Well (State Base Plane Coordinates): Surface: x-652649 -5973969 Zone-ASP4 10. KB Elevation (Hai ht above GL):Plan 64' feet 15. Distance to Nearest Well Within Pool: 33' 16. Deviated Wells: Kickoff Depth: 8750 feet Maximum Hole A le: 92 d re el 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3200 Surface: 2320 m Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data _ _ , 7" i 1 7 1 g, PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations). Total Depth MD (ft): 12962 Total Depth TVD (ft): Plugs (measured): 11322 & 12237 Effective Depth MD (ft): 12900 Effective Depth TVD (ft): 9407 Junk (measured): None Casin Len th ize ement Volume MD TVD Conductor /Structural Surface 1 - / " P II Intermediate Liner - - Perforation Depth MD (ft): 12175' -12850' Perforation Depth TVD (ft): 8939' - 9377' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ^ Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal A royal: Commission Re resentative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Gr Ho t~s Si nature Contact Eli V2izguez, 564-5918 Title Engineering Team Leader Prepared ay Name/Nixnber Phone 564-4191 Date ~D s~ Ojy' Terrie Hubble, 564-4628 C on On Permit To Drill ~ ~ ,3 API Number: so-oas-sos~s-o~-oo Permit Appro I See cover letter for Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me~th/ane, gas hydrates, or gas contained shales: ,.,,/ Samples Req'd: ^ Yes L7 No Mud Log Req'd: ^ Yes l~ No y~ ~,. \ HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: ~'~®~ ~~, c ~®C ~ 5'T °" ~%°T j ~ APPROVED BY THE COMMISSION Date % ~ COMMISSIONER Form 10-40f Revised'~2/2005 Submit In Duplicate ORIGINAL To: Alaska Oil & Gas Conservation Commission From: Eli Vazquez, ODE Date: October 21, 2008 Re: F-19A Sidetrack Permit to Drill The F-19A well is scheduled to be drilled by Nabors Rig 7ES which is currently scheduled to move onto the location 01/24/09. The plan is to exit the parent F-19 wellbore from the 9-5/8" casing at 8,750' MD with an 8-1/2" BHA. The 8-1/2' hole will be drilled to the Top of the Sag River where a 7" drilling liner will be run and cemented 150' back into the 9-5/8" casing. A USIT log will be run to determine the extent of corrosion in the 9-5/8" casing. The results of the USIT log will determine the depth of a scab liner top. If necessary, the scab liner will be tied back to surface. Cement will be brought no more than 100' from the surface casing shoe to allow for future sidetrack opportunities. The production hole will be drilled with a 6-1/8" BHA building to horizontal with 20 degree doglegs. The well will then run horizontally through the Sag River formation to TD at 14,023' MD. The liner will be a 4-1/2" slotted liner and the tubing will be 4-1/2" chrome, tied into the top of the production liner. Please reference Sundry number 307-353 for P&A. Please note the following Well Summary as detailed on the next few pages: F-19A Permit to Drill Application Page 1 Planned Well Summary Well F-19A Well Horizontal Target Sag T e Sidetrack Ob'ective River API Number: 50-029-20629-01 Current Status F-19A Shut-In and P&A Procedures commencing Estimated Start Date: 24-Jan-2009 Time to Com lete: 22.7 Days Surface Northin Eastin Offsets TRS Location 5,973,969 652,649 2845' FNL / 3088' FWL 11 N, 13E, 2 Northin Eastin TVDss Offsets TRS Target 5,979,610 651,540 -8,585 2462' FNL / 2099' FWL 12 N, 13 E, 35 Locations 5,979,620 651,110 -8,630 2443' FNL / 1670' FWL 12N, 13E, 35 5,979,541 650,403 -8,605 2508' FNL / 961' FWL 12N, 13E, 35 Bottom Northin Eastin TVDss Offsets TRS Location 5,979,425 649,400 -8,640 2604' FNL / 5235' FWL 12N, 13E, 34 Planned KOP: 8750'MD / 6555'TVDss Planned TD: 14,023'MD / 8,640' TVDss Ri Nabors 7ES GL: 35.5' RTE: 64.0' Directional -Sperry P03 KOP: 8750' MD Maximum Hole Angle: 55.5° in the 8-1/2" intermediate section ~92° in the 6-1/8" horizontal section Close Approach Wells: Major risk criteria fails for well F-21. This well will be minor risked and is current) shut in. Surve Pro ram: Standard MWD+IIFR+MS Nearest Pro a Line: 5,100' North Nearest Well within Pool: Well F-21 is the closest well at 32.9 ctr-ctr with 10.75 allowable deviation at tanned de th of 12,598' MD. Contacts Name Phone # E-mail Drilling Engineer Eli Vazquez 564-5918 vazgeOCa)bg.com Geologist Roger Sels 564-5215 Roger.SelsCc~bp.com Pad Engineer Chris Zamora 564-4138 zamoracaCa~bp.com F-19A Permit to Drill Application Page 2 • Formation Markers F-19A (Based on SOR) Estimated Formation To s Estimated. Pore Press. Formation ('!'VDss VDrkb MDrkb) EMW / Psi SVS 2840 2911 2973 SV4 2950 3021 3105 SV3 3308 3379 3599 SV2 3458 3529 3838 SVl 3847 3918 4457 UG4 4289 4360 5150 UG3 4598 4669 5632 UGl 5059 5130 6376 WS2 5654 5725 7349 WS1 5848 5919 7659 CM3 6086 6157 8036 Kickoff 6550 6619 8750 THRZ 7300 7364 9758 BHRZ/TKUP 7444 7508 9951 LCU 7444 7508 9951 TKNG 7444 7508 9951 TJF 7760 7824 10411 Ran e 2600 - 3200 si 8800 TJE 7890 7954 10631 5.68 - 7 EMW) TJD 8135 8199 11064 TJC 8290 8354 11337 F-32 recorded 2850 si in Sa TJB 8415 8479 11558 after 1 month S/I TSGR 8585 8649 11858 (6.23 EMW) TSHU near landin 8629 8693 11970 TSAD* 8705 N/A N/A TCGL* 8815 N/A N/A Casino/Tubing Program Hole Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg (psi) (psi) MD / MD / TVDrkb O.D. TVDrkb Scab Liner 7" 26# L-80 BTC-M 7 240 5,410 5,775 2 825 / 2,782' 8,600' / 6,522' 8--'/2" 7" 26# L-80 BTC-M 7,240 5,410 3,258' 8 600 / 6,522' 11,858' / 8,649' 6-1/8" 4'/~" 12.6# L-80 IBT-M 8,430 7,500 2,315' 11,708' / 8,564' 14,023' / 8,704' Tubing 4 %2" 12.6# 13Cr-80 Vam Top 8,430 7,500 11,697' Surface 11,697; / 8,557 F-19A Permit to Drill Application Page 3 Mud Program Intermediate Mud Pro erties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 8,750'-9,558' 9.1 - 9.5 12 - 18 18 - 28 < 6 N/C <18 9 - 10 9,558' - 9,850' 10 9 12 - 22 18 - 28 < 6 <10.0 <18 9 - 10 HRZ to TKNG . 9,850'-11,858' 11 5 12 - 22 18 - 28 4 - 6 <10.0 <18 9 - 10 TKNG to Sa . Production Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densi PV YP LSVR API FI H MBT 11,858'-14,023' 8.4 - 8.5 6-12 22-28 >20,000 6.0-8.0 9.0-9.5 < 3 Logging Program 8-112" Intermediate: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/PWD Open Hole: None Cased Hole: USIT for Cretaceous leak detect in the 9-5/8" Casin . 6-118" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None Cement Program Casin Size: 7" 26#, L-80 Intermediate Liner Basis: Lead: 2,108' of 7" x 8-1/2" open hole with 30% excess Lead TOG at 8,750' MD. Tail: 1,000' of 7" x 8-1/2" open hole with 40% excess, plus 80' shoe track, plus 200' of 9-5/8" x 4" drill i e annulus. Total Cement Spacer 40 bbls of Viscosified Spacer weighted to 11.7 ppg (Mud Push 11) Volume: Lead 61.9 bbls, 345.8 cult, 214.8 sks, 12.0 LiteCrete -1.61 cuft/sk Tail 31.6 bbls, 177.1 cult, 152.7 sks 15.8 Ib/ al Class G + adds -1.16 cuft/sk Tem BHST = 190° F, BHCT TBD b Schlumber er Casin Size 7", 26#, L-80, BTC-M scab liner Basis: Lead: None Tail: 5775' of 7" X 9-5/8" annulus with 25 bbls excess, plus 80' of 7", 26# shoe track, plus 200' of 9-5/8" X 4" drill pipe annulus. Total Cement Volume: Spacer 40 bbls of Viscosified Spacer weighted to 13.6 ppg (Mud Push II) Lead None Tail 180.5 bbls, 1010.7 cult, 871.7 sks 15.8 Ib/ al Class G + adds -1.16 cuft/sk Tem BHST = 190° F, BHCT TBD b Schlumber er F-19A Permit to Drill Application Page 4 Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface F-47 to the south is nearest at 34.63' center. Close Approach Shut-in Wells: F-21 fails major risk scan. F-21V1 and F-21PB1 V1 pass Minor Risk scan at 1/200 with the approaches being ~ 187.32' and 32.9' at 13,556' and 12,598 MD' respectively. F-21 is currently shut-in and will remain shut-in in order to drill F-19A. All other wells pass major risk criteria. Hydrogen Sulfide F-Pad should be considered an H2S site. Recent H2S data from the pad is as follows: WPII N.~mP N~.C i.PVPI TIatP of Rpadinu #1 Closest SHL Well H2S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level #2 Closest BHL Well H2S Level Max. Recorded H2S on Pad/Facility F-28A 10 m 6/8/2007 F-47A 20 m 8/8/2007 F-33 n/a n/a F-34A n/a n/a F-24 160 m 5/15/2007 No data available for F-19, but it is in a downthrown Other Relevant H2S Data fault block similar to F-24, which is high H2S. (H2S alarms from rigs, etc.) Faults The F-19A wellpath is not expected to intersect any mapped faults. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for F-19A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum antici ated BHP 3,200 psi 8,800' TVDss (7.0 EMW Maximum surface ressure 2,320 psi .10 psi/ft as radient to surface Kick tolerance Infinite over 12.0 FIT to 12.5 f/cementin Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 9-518" Casin Test / 7" Casin 3500 si surface ressure Inte ri Test - 8-1/2" hole 12.5 FIT after drillin 20' from middle of window 7" Casin The VBRs will be chan ed to 7" rams to accommodate the 7" liner. F-19A Permit to Drill Application Page 5 Production Interval Maximum antici ated BHP 3,200 psi 8,800' TVDss (7.0 p EMW) Maximum surface ressure 2,320 psi (.10 si/ft as radient to surface) Kick tolerance Infinite over 8.9 pp FIT (FIT to 10.0 pp f/ECD mans ement). Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 7" Liner / 4-1/2" Liner Test 3500 psi surface ressure Inte ri Test - 6-1/8" hole 10.0 FIT after drillin 20' of new hole Planned com letion fluids 8.5 Seawater / 7.2 p Diesel Variance Requests: 'c~0 '~3 V,'t'~Cs, c~L~ K~ ~~ Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA requests a variance to the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams. If the lower set of pipe rams cannot be tested during the primary BOP test, that set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. F-19A Permit to Drill Application Page 6 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be under-pressured at 6.6 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests. II. Lost Circulation/Breathing A. The F-19A RST will not cross any mapped faults in the target polygon. The proposed well is located in an area of generally E-W trending faults. Fault #1 is a short, N-S trending, ~20 ft, D to E fault located 250 ft west of the BHL. Fault #2 is a major NE-SW trending, 180 ft, D to N fault located 500 north of the planned well path. Fault #3 is a generally E-W trending, 10-20 ft, D to S fault located about 300 ft north of and generally parallel to the planned well path. Fault #4 is a generally E-W trending, 20-35 ft, D to S fault located about 300 ft south of and generally parallel to the planned well path. B. This well is located in an area considered to have "Moderate" potential for Lost Circulation, according to the WURD study. Many of the wells in the immediate area have drilled through faults without noting losses. The closest well with significant LC was the F-37, located approximately 1300 ft SW of the BHL, which lost 7580 BBL into the Shublik (near the intersection of two mapped faults). Based on the available data, the F-18A should have average potential for Lost Circulation. Details of losses in the surroundin area are noted below: Well T e Loss bbls MD TVDSS Zone X LOC Y LOC E-29 ri 1000 11161 8405 Above Sa -LCU 658565 5976996 F-34A ri 22 10920 8627 Sa River 652948 5979395 F-37 ri 7580 10780 8633 Shublik 648449 5978495 F-42 ri 54 11650 9111 Below BSAD 651163 5980512 J-24A coil 350 12475 8586 Sa River 646579 5976485 J-24A coil 550 12895 8604 Sa River 646921 5976263 J-24A coil 190 10938 8594 Shublik A 645288 5976197 III. Kick Tolerance/Integrity Testing A. The Kick Tolerance for both the intermediate and production hole sections is infinite with planned mud weights. B. Integrity Testing Test Point Test De th Test EMW Ibt at 9 5/8" window 20-ft minimum from the 9 5/8" window FIT 12.5 minimum 7" shoe 20-ft minimum from the 7" shoe FIT 10.0 minimum IV. Stuck Pipe A. Significant directional work will be required in the production hole section. Hole cleaning and differential sticking tendency will be of concern. Watch for signs of tight hole and short trip /back ream as required to avoid stuck pipe. VI. Hydrogen Sulfide A. F-PAD is designated as an H2S site. F-19 H2S data is not available. H2S levels above the 100 ppm threshold have been recorded on this pad. VII. Faults A. The F-19A wellpath is not expected to intersect any mapped faults. See Section II on lost circulation for more details. VIII. Anti-Collision Issues A. Due to close approach concerns, one well will remain shut-in in order to drill F-19A. This is F-21 in the production holes, with the closest approach of 32.9 ctr-ctr at 12,598' MD. CONSULT THE F-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION F-19A Permit to Drill Application Page 7 Operations Summary A. Well Status: 1. MIT - OA passed 2000 psi 10/11/2007 2. CMIT - T x IA failed 10/11/2007 Notify the field AOGCC representative with intent to plug and abandon B. Pre-Riq Work: 1. F: Fluid pack the tubing and inner annulus w/seawater/diesel. 2. S: RU, pull 4-1/2" PX Plug @ 11,322' MD. Drift tubing and tag bottom if possible. 3. C: P & A the perforations in the F-19 wellbore with cement from 12,237' MD up to the 9-5/8" x 4-1/2" packer at 11,299' MD. a. CEMENT CALCULATIONS i. 609' of 7", 26# liner: .038262 bbls/ft = 23.3 bbls ii. 112' of 9-5/8", 47# casing: .073206 bbls/ft = 8.20 bbls iii. 172' of 5-1/2", 17# tubing: .023247 bbls/ft = 4.0 bbls iv. 45' of 4-1/2", 12.6#" tubing: .015218 bbls/ft = 0.68 bbls TOTAL (with 0.8 bbls excess) = 37 bbls . Test cement plug to a minimum of 2100 psi 4. S: WOC. Drift for Jet Cutter. Tag Top of Cement. 5. E: Jet cut the 4-1/2" tubing in the middle of a full joint at 9250' MD. 6. F: Circulate the well to seawater through the tubing cut. Freeze protect the IA and tubing with diesel to 2,200'. 7. F: CMIT - T x IA to 3,000 psi for 30 minutes (previous CMIT-TxIA test failed 10/11/07). MIT - OA to 2,000 psi for 30 minutes. 8. D: Bleed all casing and annulus pressures to zero psi. 9. W: Function all tubing and casing lock down screws. Repair and replace as necessary. PPPOT - IC and PPPOT - T. 10. V: Set a BPV. Remove well house and flow line. Level the pad as needed. Provide total well preparation cost on the handover form. C. Riq Operations: ~ ®~ .~ 1. MIRU. 2. MIT - OA 2000 psi for 30 minutes. 3. Pull BPV. Circulate out freeze protection and displace well to seawater. Set a TWC and test from below to 1000 psi for 30 minutes (also tests TxIA). 4. Nipple down tree. Nipple up and test BOPE. Pull TWC. 5. RU and pull the 4-1/2", 12.6#, L-80, NSTC tubing from the pre-rig jet cut at 9250' MD. Spool up the duel control lines and count stainless steel bands (55 listed on tally). Test the lower set of pipe rams. 6. RU E-line and run GR/JB to confirm access to run an EZSV and BOT whipstock assembly (If GR/JB indicates a scraper run is needed, PU 4" drillpipe and 9-5/8" clean-out assembly and clean-out well to the top of the tubing stub 9250' MD). 7. Run a CCUUSIT in corrosion mode from the tubing stub to surface. The USIT will determine if a scab liner or tieback is necessary (this wellplan will assume a scab liner is run 100' below the surface casing shoe). 8. With E-line, run a 9-5/8" EZSV for 47# casing. Set the EZSV at 8773' MD. Rig down E-line. 9. Pressure test the EZSV to 3500 psi for 10 minutes and chart. If the test fails, run an RTTS to the scab liner top (2825' MD) and test to 3500 psi above the RTTS for 30 minutes. 10. PU 9-5/8" whipstock, bottom trip anchor and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to 9.1 ppg fresh 11. Mill a window in the 9-5/8" casing from 8750' MD' plus 20' of formation from mid-window. 12. Perform an FIT to 12.5 ppg. POOH for drilling BHA. 13. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and ghost reamer 2200' from bit. RIH. Kick off and drill 8-1/2" intermediate interval to 7" casing point at the top of the Sag River (11,858' MD). CBU, short trip 2200' (to ghost reamer depth) and back to TD, circulate well clean and POOH. l ~-c ~ P c~-ti~~~ F-19A Permit to Drill Application Page 8 NOTE: The mud will need to be weighted up with spike fluid. Ensure that the mud weight is at least 10.9 ppg prior to drilling into the HRZ and it must be 11.5 ppg prior to drilling into the Kingak formation. 14. Run and cement a 7", 26#, L-80, BTC-M drilling liner throughout the 8-1/2" hole and back into the 9- 5/8" casing 150' to 8600' MD. Set hanger /liner top packer and displace cement with mud. POOH. 15. Run a 7" scab liner from the top the 7" drilling liner at 8600' MD to 2825' MD (100' below 13-3/8" shoe). Fully cement the scab liner. Stab into the 7" liner tieback receptacle. Set the liner hanger/packer and circulate out the excess cement. POOH. 16. Pressure test the 7" tieback to 3500 psi for 30 minutes after sufficient compressive strength is obtained. 17. MU a 6-1/8" drilling assembly with used bit, float sub, drill collars, heavy weight and jars. Drill out the 7" tieback float equipment. Continue running in hole to the 7" drilling liner landing collar. 18. Wash down to the top of the cement plug in the 7" drilling liner. Pressure test-the liner to 3500 psi for 30 minutes and chart. Drill out the baffle adapter and float collar leaving ~10' above the float shoe. Swap the well over to 8.4 ppg FloPro SF mud. POOH. 19. MU a 6-1/8" BHA with DIR/GR/RES/ABI and RIH to the 7" landing collar. Drill out the remaining shoe plus 20' of formation. Perform an FIT to 10.0 ppg. 20. Drill ahead per plan building to horizontal and complete the 24 and 18°/100' doglegs. POOH for bit and BHA change. 21. MU a 6-1/8" BHA with DIR/GR/RES/DEN/NEU/ABI. RIH, verify with town geo to MAD pass build interval. Drill ahead in the horizontal per plan to an estimated TD of 14,024' MD. 22. CBU, short trip, circulate until clean and spot a liner running pill. POOH. 23. Run a 4-1/2", 12.6#, L-80, IBT-M SLOTTED liner from TD to 150' inside the 7" shoe. Set the liner top packer and displace the cement with mud followed by clean seawater. 24. RU and run 4-1/2", 12.6#, 13Cr-80, Vam Top completion, tying into the 4-1/2" liner top. 25. Set packer and individually test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes each. 26. Set and test a TWC. 27. ND BOPE. NU and test the tree to 5,000 psi (tree will be changed with 4") 28. Freeze protect the well with diesel to 2200' MD. Set a BPV 29. RDMO. D. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 2. Install gas lift valves. 3. Install wellhouse and flowlines. (S-Riser work required) Estimated Pre-rig Start Date: Estimated Spud Date: 01 /09/2009 01 /24/2009 F-19A Permit to Drill Application Page 9 TREE _ ~ 4" CNV WELLHEAD = FMC ACTUATOR= BAKER KB. ELEV = 71.38' BF. ELEV = 37.93 KOP = 2100' Max Angle = 53 @ 6700' Datum MD = 12077' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 19 SA NOTES 2171' -{4-1/2" OTIS SSSV NIP, ID = 3.813" 2725' FOC GAS L IF-f MANDRELS Minimum ID = 3.725" @ 11333' 4-1/2" OTIS XN NIPPLE 4-1/2" TBG, 12.6#, L-80 BUTT, .0152 bpf, ID = 3.958" 5-1/2" TBG, 17#, L-80, 0.0232 bpf, ID = 4.892" TOP OF 7" LNR 9-5/8" CSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY REF LOG: SWS BRCS ON 10/03/81 ANGLE AT TOP PE}~: 47° @ 12175' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqi DATE 3-3/8" 6 12175-12205 C 09/21/94 3-3/8" 6 12177-12199 C 02/03!96 3-1/8" 4 12332-12360 C 12/26/87 3-3/8" 4 12800-12850 C 12/26/87 4-1/2" TBG, 12.6#, L-80 BUTT, .0152 bpf, ID = 3.958" LPBTD 7" LNR, 26#, L-80 U4S, .0383 bpf, ID = 6.276" ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3189 3089 38 TGPD DOME RA 16 02/24/95 4 6242 5048 52 TGPD DOME RA 16 02124/95 3 8755 6625 48 TGPD DOME RA 16 02/24/95 2 10193 7578 47 TGPD DMY RA 0 12/23/94 1 11216 8295 46 TGPD SO RA 20 02/24/95 11287' - i 4-1 /2" OTIS X NIP, ID = 3.813" 11299 9-5/8" x 4-1/2" TNV HBBP PKR ID = 4.0" 11322' 4-1/2" OTIS X N~, ID = 3.813" 11322' a-v2° PX PLUG (1a1ao7) 11333' 4-1 /2" OTIS XN NIP, ID = 3.725", 11363 TM/ OVERSHOT SEAL ASSY W/O SEALS 11378' 9-5l8" x 5-1/2" TM/ HBBP PKR ID = 4.75" 11431' 5-1/2" OTIS X NIP, ~ = 4.562" 11475' S-1 /2" OTIS XN NIP, ID = 4.455" 11516' S-1 /2" wLEG, ID =x.892° 11489' ELMD TT LOGGED 05/18/85 1~ 62$' 1 9-5/8" X 7" LNR HGR ID = 6.125" ~MD CEWI~IT CAP MARKER JOINT, ELMD 20/40 CL TOP { 12430' H 4-1/2" WD PKR i 12436 4-1/2" OTIS X NIP, ID = 3.813" 1244Q' 4-1 /2" OTIS XN NIP, ID = 3.725" 1244Q' 4-1/2" OTIS XXN PLUG 12441' 4-1/2" WLEG, ID = 3.958" 12439' ELMD TT LOGGED 05/18/85 DATE REV BY COMMENTS DATE REV BY COMMENTS 10/08/81 SUSPEND® 01/16/08 RCT/PJC SET PX PLUG (10/10/07) 02/12185 N18E ORIGINAL COMPLETION 12117/94 N2ES RWO 02/03/96 SRW ADPERFS 10/21/07 CAZ/PJC DRAWING CORRECTIONS PRUDHOE BAY UNIT WELL: F-19 PERMIT No: 1811060 API No: 50-029-20629-00 SEC 2, T11 N, R13E, 2845' SNL & 2192' WEL BP Exploration (Alaska) TREE = 4" CNV WELLHEAD = FMC ACTUATOR= BAKER KB. ELEV = 71.38' BF. ELEV = 37.93 KOP = 2100' Max Angle = 53 @ 6700' Datum MD = 12077' Datum TVD = 8800' SS F -19 SA NOTES ~ PRE-RIG 13-3/8" CSG, 72#, L-80, ID = 12.347" ~-i Z7Z5' I Minimum ID = 3.725" @ 11333' 4-1 /2" OTIS XN NIPPLE Re Ria Jet Cut -9,250' I Estimated Too of Cement '1 4-1/2" TBG, 12.6#, L-80 BUTT, .0152 bpf, ID = 3.958" 15-1/2" TBG, 17#, L-80, 0.0232 bpf, ID = 4.892" ~ 9-5/8" CSG, 47#, L-80, ID = 8.681 " PERFORATION SUMMARY REF LOG: SWS BHCS ON 10/03/81 ANGLE AT TOP PERF: 47° @ 12175' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12175-12205 C 09/21/94 3-3/8" 6 12177-12199 C 02/03/96 3-1/8" 4 12332-12360 C 12/26/87 3-3/8" 4 12800-12850 C 12/26/87 4-1/2" TBG, 12.6#, L-80 BUTT, .0152 bpf, ID = 3.958" 7" LNR, 26#, L-80 IJ4S, .0383 bpf, ID = 6.276" I 2171' ~4-1/2" OTIS SSSV NIP, ID = 3.813" 2725' FOC (SAS LIFT MANDRELS - ~- - . - .~ tls O• ~. ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3189 3089 38 TGPD DOME RA 16 02/24/95 4 6242 5048 52 TGPD DOME RA 16 02/24/95 3 8755 6625 48 TGPD DOME RA 16 02/24/95 2 10193 7578 47 TGPD DMY RA 0 12/23/94 1 11216 8295 46 TGPD SO RA 20 02/24/95 11~ 2$7' J-- ~4-1/2" OTIS X NIP, ID = 3.813" I 11299' 9-5/8" x 4-1 /2" TMI HBBP PKR ID = 4.0" 11322' 4-1/2" OTIS X NIP, ID = 3.813" °` '', , :;,' ~ 4-1 /2" OTIS XN NIP, ID = 3.725" I 11363' I~TNV OVERSHOT SEAL ASSY W/O SEALS 11378' 9-518" x 5-112" TMI HBBP PKR, ID = 4.75" 11431' S-1/2" OTIS X NIP, ID = 4.562" 11475' S-1/2" OTIS XN NIP, ID = 4.455" 11516' 5-1/2" WLEG, ID = 4.892" 11489' ELMD TT LOGGED 05/18/85 1~$' ~ 9-5/8" X 7" LNR HGR, ID = 6.125" 12237' I--I EL MD CEMENT CAP I 12324' MARKERJOINT, ELMD 12430' -~4-1/2" WD PKR 12436' 4-1/2" OTIS X NIP, ID = 3.813" 12440' 4-1/2" OTIS XN NIP, ID = 3.725" 12440' 4-1/2" OTIS XXN PLUG 12441' 4-1/2" WLEG, ID = 3.958" 12439' ELMD TT LOGGED 05/18/85 DATE REV BY COMMENTS DATE REV BY COMMENTS 10/08/81 SUSPENDED 01/16/08 RCT/PJC SET PX PLUG (10/10/07) 02/12/85 N18E ORIGINAL COMPLETION 10/17/08 EV 2009 Proposed Pre Rig 12/17/94 N2ES RWO 02/03/96 SRW ADPERFS 10/21/07 CAZ/PJC DRAWING CORRECTIONS PRUDHOE BAY UNff WELL: F-19 PERMfT No: 1811060 API No: 50-029-20629-00 SEC 2, T11 N, R13E, 2845' SNL & 2192' WEL 8P Exploration (Alaska) TREE = 4" WELLHEAD= FMC ACTUATOR = KB. ELEV = BF. ELEV = 37.93' KOP = 8750' Max Angle = Datum MD = Datum TV D = •F-19A PROPOSED 13-3/8" CSG, 72#, L-80, D= 12.347" 2725' 7"scab liner top ! BOT hanger/packer 2825' Fully cemented 15.8 ppg Class G 2825' Minimum ID = 3.725" ~ 11858' 4.5" HES XN Landing Nipple 19-5/8" BOT Whipstock ~--I 8773, 9-5/8" ¢SV Plug 8776' Tub'v~g Jet C ut 9250' = 3.958" H 1 ~ ~ 9-5/8" CSG, 47~, L-80, ®= 8.681" H 12117' PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE SAFETY 2100' H4-112" HES X LANDING NIP, D= GAS L~-r MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 5 4 3 2 1 880Q' 7", 26#, L-80, BTGM, scab der 8600' 7" LNR Top Packer (BOT HCM2XP) 11711' H4.5", 12.6i~, 13CR-80, VAMTOP, TBG. Fulht Cemerrted Lktter 15.8 ppg Class 11599' 4.5" HES X Landing N~ple ID=3.813" 11610' S" x 7" BOT S-3 Packer 11635' 4.5" HES X Land'ng N~pte X3.813" 11897' 4.5" HES XN Landing N~ple X3.75" I I I I 11708' 4.5" LNR Top Packer (BOT HCM2XP) I I I I 11858' 7", 26w1, L-80, BTGM, Liner I I I I I I I I 14023' 4.5", 12.6#, L-80, IBT-M, Slotted L'mer 11287' -i4-1i2" OT4S X Nom, D = 3.813" 11299' 9-5/8" x 4-112 TMI HBBP PKR, D = 4.0" 12324' MARKER JOINT, ELMD 12430' H4-112" WD PKR F-19 perforations plugged and abandonded with 15.8 ppg cement to -11299' ,~_ DATE REV BY COMMENTS DATE REV BY COMMENTS 10/08/81 SUSPENDED 01/16/08 RCT/PJC SET PX PLUG (10/10/07) 02/12/85 N18E ORIGINAL COMPLETION 10/17/08 EV 2009 Proposed Sidetrack 12117/94 N2ES RWO 02/03/96 SRW ADPERFS 10/21/07 CAZ/PJC DRAWING CORRECTIONS PRUDHOE BAY UNrf WELL: F-19 PERMrf No: 1811060 API No: 50-029-20629-00 SEC 2, T11 N, R13E, 2845' SNL & 2192' WEL BP Exploration (Alaska) COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM ,~1~ BP Amoco Co-ordinate (N/E) Reference: Well Centre: F-19, True North epth Fm Dcpih To Survey/Plan Tool Plan: F-I9A Wp 3.0 (F-19/Plan F-I9A) = j ~.IP Vertical (TVD) Reference: 35.SGL+28.SKB=64.064.00 711 Mr Iculation Method: Minimum Curvature Section (VS) Reference: Slut - 19 (O.OON,O.OOE) 750.00 14022.99 Planned: F-I9A Wp 3.0 V 12 MWD+IFR+MS CrCaled By : Sperry Drilling Dale: 10/25/2007 Error System: ISCWSA Measured Depth Reference: 35.SGL+28.SKB=64.0 64.00 Scan McthoJ: Trav Cylinder North Calculation Method: Minimum Curvature WELL DETAILS Error Surface: Elliptical+Caaing Name +N/-S +E/- W Northing Easting Latitude Longitude Slut CASING DETAILS ~ F-19 14 07.54 1717. 10 5973968.99 652649.00 70°20'09.124N 148°45'41 .322W 19 No . TVD MD Name Size l 8648.84 11858.00 7" 2000 2 8704.00 14022.96 41/2" 4.500 Scc MD [nc Azi TVD +N/-S +E/-W DLeg TFace VSec Target HALL 1 B U R TO N I 8750A0 48.11 9.19 6618.67 4710.67 742.88 0.00 0.00 3728.60 2 8770.00 48.36 12.39 6631.99 4725.32 745.67 12.00 85.00 3739.96 3 10587.62 55.51 275.03 7929.42 5571.02 49.24 4.00 -12L12 4819.31 l i i S illi O 4 1185829 55.51 275.03 8649.00 5662.83 -994.02 0.00 0.00 5414.55 F-19AT1 P arr Y Ci l arV r n Q ~ ~ ~ S 12037.03 91.14 272.00 8699.48 5672.73 -1162.19 20.00 -5.19 5506.25 - ~ ~ 6 12265.71 91.14 272.00 8694.91 5680.72 -139Q68 0.00 Q00 5626.07 - - - - - ~ - ~ ~- ~' ~ 7 12298.81 92.02 271 AO 8694.00 5681.58 -1423.76 4.00 -48.74 5643.17 F-I9A T2.Rcv 1 8 13011.88 91.99 258.64 8669.00 5617.40 -2132,10 1.73 -89.92 5')37.32 F-I9A T3 Rcv 1 650 9 13208.96 87.59 265.18 8669.73 5589.70 -2327.07 4.00 123.89 6009.56 ' 1 Sta ~ rt Di l2°/100' : 8750' MD, 6618 6631 770' MD " ' TTVD 99'TVD 10 14022.99 87.59 265.18 8704.00 5521.42 -3137.50 O.OU 0.00 6350.59 F-I9A T4 - - ]- - - St i ~ -- art , it 4 /l W :8 i . I + L I ~ _ 1 __ - I I # _ ~ ~.. t ~ _ _. 1 _ ~ _ - I 7000- ~, i ~ ~ ' ~ ' --- _ _ ~ I . ~~ '. - i f , . _ - t -. - i ( . -~ - . r i ' I ' _ t - - I 1 I { ~ ~ 7500 I 1 - - - ' ' I -1 I o ~ ! .- : . BHRZ/TKUP 100 - - 0 -. .. ! r_ ~ - ~ I - - _ II _ ! - .~_ - -- ~ I ~ TJF , En Di r :10587.62' MD,-792 42' TVD ~ l I ~' ....,. '': ~ '. j ! -- - ~ i :.. -- i _ I ~ - I .---~,- - _- TJE I FORMATION TOP DETAILS No. TVDPath MDPath Formation iI I ' I '~ Start Dir 20 °/100' : l 1858 ~9' MD 8649"I-VD i ', I 7364.00 9757.91 THRZ ', i ~ ~ ~ 4 J ' ' 2 7508.00 9950.51 BHRZ/TKUP ~ i -;- 0 1 T 0 ~ Entl Drr :120 37.0 MD 8 699.48 TVD ~ 3 7508.00 9950.51 LCU ~ 1 i ~ i Start Dir 1 73"/L0 0 12298.81' MD, 694'TVD i ~ 4 5 7508.00 9950.51 TKNG 7824.00 10410.99 TJF . - _ ~ :- t I ~ ' --- ~ ' - - ~, ~ ~ TJ C - ~~~ ~ - ~ t St art D 4"/100 S ' 12265.71' MD, 8 tart Dir 4°/100' : l3 94.91'TVD I L88' MD, 8669 'TVD ~ - - - '.. ~, 6 7954.00 10631.02 TJE _, I _-. _[_ _ '_; / -' End Dir :1 3208. 6' MD, 86(19.73' TVD ' 7 8199.00 11063.65 TJD ! I 8 00 11337.36 TJC 8354 I I I i / Total Dept h :14022. 9' MD, 8704' TVD 9 . 8479.00 11558.09 TJB ~ -I F-I9A Gc o-PoIY Fd9A T3 Rcv l I , 10 8649.00 1185829 TSGR 49A-T ! __._ ___- - -~ -__ ~ F ,19A Fau t 3 I I 8693.00 11969.92 TSHU ,___-_ _ TSG~ _ P- l9 Fault 2 - _ .. i - .: ! 0 13 00 4 l/~"40~, _ F ult I 1 ~ ~ - 1 - TARGET DETAILS - . 9A T4 1 I F-I9A Fault 4 ~ an F-I9A - ~ ~' Name TVD +N/-S +E/-W Northing Easting Shape ~ - _~ _ F-1 9AT2.R evl . - rT- \ F-1 ' 0. AWp3 ~ 1 - -. F-I9A Tl 8649.00 5662.83 -994.02 5979610A0 651540.00 Point . '. ~T I ~; ~ , . i I I F-I9A Gco-Poly 8649.00 5662.83 -994.02 5979610A0 651540A0 Polygon - - - - - ~ - F-I9A T3 Rcv 1 8669.00 5617.40 -2132.1(] 5979541.42 650403.17 Poin[ F-I9A Faultl 8693.00 543 L40 -3383.40 5979330.01 649156.00 Polygon F 19 (F-19) F-I9A Fault 3 8693.00 6347.69 -2402.48 5980266.01 650118.00 Pulygon F-I9A Fault 4 8693.00 5354.96 -1790.51 5979286.00 650750.00 Pulygon 50 00 55 00 60 00 6 500 7000 7500 F-I9A Faultl 8693.00 5798.22 -3615.00 5979692.01 648917.00 Polygon F-I9A T2. Rev 1 8694.00 5681.58 -1423.76 5979620.00 651110.00 Point VcrticalScction x[330.39°[SOOfUin ] F-I9A T4 8704.00 5521.42 -3137.50 5979425A1 649400.00 Poin[ COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM BP Amoco o-ordinate (N/E) Reference: Well Centre: F-19, Tme Nurth Depth Fm Depth To Survey/Plan Toul Plan: F-I9A Wp 3.0 (F-19/Plan F-19A) Vertical (TVD) Reference: 35.56E+2KSK8=64.0 64A0 Calculation Method: Minimum Curvature Section (V S) Reference: Slut - 19 (OAON,O.OOE) 8750.00 14022.99 Planned: F-I9A Wp 3.U V 12 MWD+IFR+MS Created By: Sperry Drilling Date: 10/25/2007 Error System: ISCWSA Measured Depih Reference: 35.56E+28.SK6=64.0 64.00 Scan Method: Trav Cylinder Nurth Calculation Meihod: Minimum Curvature WELL DETAILS Ertor Surface: Elliptical+Casing Warning Method: Rules Based Name +N/-S +E/-W Northing Easting Latitude Longitude Slot H A ~ ~' p , `~ ~ O ~ - ' I I ~ F-19 1407.54 1717.10 5973968.99 652649.00 70°20'09.124N 148°45'41.322W 19 ~' '~ i TARGET DET AILS Sparry Orllling Services I l- i ' ~ 1 I Name TVD +N/-S +E/-W Nor[hmg Eashng Shape -+- I, C = F-19A Tl 8649.00 5662.83 -994.02 5979610A0 651540.00 Point ' ~ ~ -' ~ ~ - - ~ _ I F-l9A Gco-Poly 8649.00 5662.83 -994.02 5979610.00 651540.00 POIygOn ' ' I _ I F-19A T3 Rcv l 86(19.00 5617.40 -2132.10 5979541.42 650403.17 Poinl - ~ ~ ~ - - ~ ~ : -- - ~ ~ ~ ~ F-I9A Fault 1 8693.00 5431.40 -3383.4(1 597933(IAI 649156A0 Polygon 6580 ~ F-I9A Faul[3 8693.00 6347 69 -2402.48 5980266.01 650118.00 Polygon _i - - - - ~ ~ ~ ~ - - - : - - ~ r ~ ~ ~ - - _ - F-19A Fault 4 8693.00 5354.96 -1790.51 5979286.00 650750.00 Polygon ~ ~ F-I9A Fault 2 8693A0 5798.22 -3615.00 5979692.01 64891200 Polygon . -_ -_ __ - _ F-19A T2.Rev I 8694A0 5681.58 -1423.76 5979620.00 651110.00 Point I _ l ~. ' F-19A T4 8704.00 5521.42 -3137.50 5979425.01 649400.00 Point f ~ ~rP=r9 ( ~ A F ult 3 ~ _ I i FORMATION TOP DETAILS ~ i I ~ i ~ ii i ~~ ~ No. TVDPath MDPuth Formation • _ ' ~. ~ _ ~I - ~ i . ~ - - - - - I ! i ~ I ~ 1 7364.00 9757.91 THRZ 6141 ' ' ' ~ ' I I ' 2 7508.00 9950.51 BHRZ/TKUP ~ I . ~ ~ ~ I ~~ i I ~ ~ '~ 3 7508.00 9950.51 LCU i ~ ~ ~ ' ~ ~' ~ 00 9 0 4 7508. 95 .Sl TKNG _ - ~ I ~- i_ - 5 7834.00 10410.99 TJF . , ~ _ 6 7954.00 1063 L I __.-, . I . _ ~ ~ I 7 8199.W 11063.65 T1D _ -' _ , -_ _ ~ _ ,, \ ~ _ - ~ Start Dir 4°/100' 1226 .71' MD, 869 4 91'TVD ~ _ I 8 8354.00 11337.36 T1C ~ , ~ , 1 --'~ ~ 90 864900 11858 X 9 T S'R -V _ ~ Start it 1.73°/100.12298.81 _ D, 8694'TVD End Dic : 12 '~ - - 37A3' MD, 8699.48 TVD ' - ~ - I1 8693.00 11969.92 TSHU ~ - - ~ - i - - - - - ` St t Dir 20°/100 ' : l 1858?9' D, 8649 TVD 5702 + L it '. '. i I - II'ibo-Poly ~. c - -~. _. I - AT3Revl ~ 7 t l ~ 1, ~y. . -- ~ Start Dtr 4°/100' . 301 L88' MP, R6b9-TVQ-- -~- ~ 8500 - . ~ - - -_ ~ r 4 ~ rn ~ .., -- i End a .~132U8.96 MD, 8669 3' TVD _ _ I - Y _- ~ _ ~ - ~ ~ ; 8000 ~ . _ _ _ ,-- - _. _ _,- _._ ---- - F-I9A Fault 4- - - ~ ~ ~ ~ - En d Dir :1058 .62' MD, 7929.4 , 2' TVD. -. .1 }-~ II 7500 ,i 5264 otal Depth: 14022.99' MD 8704' T VD '. ~ - - - - - - - .. t. I _ . ~ '' I ',I _ I 1 ' _ - I . - - J I ~l ~ L~ 1 ~ ~ - __ - I __ ~ ~I ~ 11 ---- I ~ -_ - - ~ 70 - ( - - - ,_ _c_ . ~ ~ ~ _ _ r _ I I- t- I 1 r t i CASING DETAILS I ~ ~ -_ i. -- ~-- No. TVD MD Name Size ;~. I I ~ ~ _ ~ - ' I - I .Start Di[ 4 /100'.: 8720' MD, 6631.99' VD ~~ 1 8648.84 11858.00 7" 7.000 ~ _..- ~ II ~ - ` - Start Dir 1 "1100' :875 0' MD; 66!8.6 'TVD 2 8704.00 14022.96 4 1/2" 4.500 ~ _ SECTION DETAILS 6 0 0 ~ ~ ~ ~ ~ Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSix Target - . ._ __ I 8750.W 48.11 9.19 6618.67 4710.67 742.88 QOU 0.00 3728.60 - ~~ 2 8770.W 48.36 12.39 6631.99 4725.32 745.67 12.00 85.00 3739.96 - - - - - - r f- ' ~ ~ ~ '~ - 3 10587b2 55.51 275.03 7929.42 4 11858.29 55.51 275.03 864400 5571.02 5662.83 49.24 -994.U2 4.00 -I21.I2 4819.31 0.00 0.00 5414.55 F-19A TI S 12037.03 91.14 272.011 8G99A8 5!>72.73 -1162.19 20.00 -5.19 55(16.25 I - ~ 6 12265.71 91.14 272.00 8694.91 5(>80.72 -139D.68 (200 O.W %26.07 - 7 12298.81 92.02 27L00 8694.W S68LSR -1423.76 4.011 -48.74 5643.17 F-I9A T2.Rovl -- -- 8 13UI LRR 9199 258.64 8669.00 5(17.40 -2132.10 1.73 -89.92 5937.32 F-19A T3 Rcv I 9 13208.96 87.59 265.18 8669.73 5589.70 -2327.07 4A0 123.89 6009.56 -1316 -877 -439 0 439 877 10 14022.99 87.59 265.18 8704.00 5521.42 -3137.50 0.00 0.00 6350.59 F-19A T4 West(-)/East(+) [ft] Sperry-Sun BP Planning Report Company: BP Amoco bate:. 10!25/2007 Time: 16:17:06 Page: 1 .Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell` F-19, True North Site: PB F Pad Vertical (TVD) Reference: 35.5GL+28.5K6=64,064:0 Well: F-19 Section (VS) Reference: Well {O.OON,O:OOE,330.39Azi) Wellpath: Plan F-19A Survey Calculation Method: . Minimum Curvature Db: OraGe ' Plan: F-19A Wp 3.0 Date Composed: 10/9/2007 Version: 12 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: W eIl Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB F Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5972527.29 ft Latitude: 70 19 55.283 N From: Map Easting: 650960.70 ft Longitude: 148 46 31.468 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.15 deg Weil: F-19 Slot Name: 19 F-19 Well Position: +N/-S 1407.54 ft Northing: 5973968.99 ft Latitude: 70 20 9.124 N +E/-W 1717.10 ft Easting : 652649.00 ft Longitude: 148 45 41.322 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 11858.00 8648.84 7.000 8.500 T' 14022.96 8704.00 4.500 6.125 41/2" Formations MD ft TVD ft Formations Lithology Dip Angle deg Dip Direction deg 9757.91 7364.00 THRZ 0.00 0.00 9950.51 7508.00 BHRZ/TKUP 0.00 0.00 9950.51 7508.00 LCU 0.00 0.00 9950.51 7508.00 TKNG 0.00 0.00 10410.99 7824.00 TJF 0.00 0.00 10631.02 7954.00 TJE 0.00 0.00 11063.65 8199.00 TJD 0.00 0.00 11337.36 8354.00 TJC 0.00 0.00 11558.09 8479.00 TJB 0.00 0.00 11858.29 8649.00 TSGR 0.00 0.00 11969.92 8693.00 TSHU 0.00 0.00 Targets Name Description TVD +N/-S +E/-W Dip. f)ir. ft ft ft F-19A T1 8649.00 5662.83 -994.02 F-19A Geo-Poly 8649.00 5662.83 -994.02 -Polygon 1 8649.00 5806.91 -1831.32 -Polygon 2 8649.00 5938.26 -2239.76 -Polygon 3 8649.00 5858.28 -2634.50 -Polygon 4 8649.00 5664.40 -3183.60 -Polygon 5 8649.00 5298.90 -3115.02 -Polygon 6 8649.00 5535.17 -1994.90 -Polygon 7 8649.00 5565.16 -1208.07 -Polygon 8 8649.00 5794.84 -1238.40 F-19A T3 Rev 1 8669.00 5617.40 -2132.10 F-19A Faun 1 8693.00 5431.40 -3383.40 Map Map <-- Latitude --> <- Longitude =-> Northing Easting Deg Min Sec Deg 'Min Sec ft ft 5979610.00 651540.00 70 21 4.817 N 148 46 10.373 W 5979610.00 651540.00 70 21 4.817 N 148 46 10.373 W 5979737.00 650700.00 70 21 6.233 N 148 46 34.846 W 5979860.00 650289.00 70 21 7.523 N 148 46 46.784 W 5979772.00 649896.00 70 21 6.735 N 148 46 58.320 W 5979567.00 649351.00 70 21 4.827 N 148 47 14.366 W 5979203.00 649427.00 70 21 1.232 N 148 47 12.358 W 5979462.00 650542.00 70 21 3.560 N 148 46 39.624 W 5979508.00 651328.00 70 21 3.856 N 148 46 16.629 W 5979737.00 651293.00 70 21 6.115 N 148 46 17.516 W 5979541.42 650403.17 70 21 4.368 N 148 46 43.635 W 5979330.01 649156.00 70 21 2.534 N 148 47 20.203 W Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 Time: 16:17:06 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-19, True`North Site: PB F Pad Vertical (TVD) Reference: 35,5GL+28:5KB=64.0 64:0 Well: F-19 Section (VS) Reference: Well (O.OON,O.OOE,330.39Azi) Wellpath: Plan F-19A Survey CalculahonMethod: Minimum Curvature Db: Oracle Targets Map Map z.--- .Latitude --~ <-- Longitude -> .Name.. Description TVD +N/-S +E/-W Northing Fasting Deg. Min See Deg Mi n Sec Dip. Dir. ft ft ft ft ft -Polygon 1 8693.00 5431.40 -3383.40 5979330.01 649156.00 70 21 2.534 N 148 47 20.203 W -Polygon 2 8693.00 5631.55 -3437.34 5979529.01 649098.00 70 21 4.502 N 148 47 21.782 W -Polygon 3 8693.00 5920.80 -3445.46 5979818.01 649084.00 70 21 7.347 N 148 47 22.023 W -Polygon 4 8693.00 5631.55 -3437.34 5979529.01 649098.00 70 21 4.502 N 148 47 21.782 W F-19A Fault 3 8693.00 6347.69 -2402.48 5980266.01 650118.00 70 21 11.550 N 148 46 51.544 W -Polygon 1 8693.00 6347.69 -2402.48 5980266.01 650118.00 70 21 11.550 N 148 46 51.544 W -Polygon 2 8693.00 6008.87 -1777.20 5979940.01 650750.00 70 21 8.219 N 148 46 33.265 W -Polygon 3 8693.00 5959.23 -910.96 5979908.01 651617.00 70 21 7.732 N 148 46 7.947 W -Polygon 4 8693.00 6008.87 -1777.20 5979940.01 650750.00 70 21 8.219 N 148 46 33.265 W F-19A Fault 4 8693.00 5354.96 -1790.51 5979286.00 650750.00 70 21 1.788 N 148 46 33.650 W -Polygon 1 8693.00 5354.96 -1790.51 5979286.00 650750.00 70 21 1.788 N 148 46 33.650 W -Polygon 2 8693.00 5398.83 -899.37 5979348.00 651640.00 70 21 2.221 N 148 46 7.606 W F-19A Fault 2 8693.00 5798.22 -3615.00 5979692.01 648917.00 70 21 6.141 N 148 47 26.976 W -Polygon 1 8693.00 5798.22 -3615.00 5979692.01 648917.00 70 21 6.141 N 148 47 26.976 W -Polygon 2 8693.00 6045.53 -3135.83 5979949.01 649391.00 70 21 8.575 N 148 47 12.975 W -Polygon 3 8693.00 6384.55 -2247.68 5980306.01 650272.00 70 21 11.913 N 148 46 47.019 W -Polygon 4 8693.00 6045.53 -3135.83 5979949.01 649391.00 70 21 8.575 N 148 47 12.975 W F-19A T2.Rev 1 8694.00 5681.58 -1423.76 5979620.00 651110.00 70 21 5.001 N 148 46 22.933 W F-19A T4 8704.00 5521.42 -3137.50 5979425.01 649400.00 70 21 3.421 N 148 47 13.017 W Plan Section Information MD Incl Azim' TVD +N/-S +E/-W DLS ' Build ' Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 8750.00 48.11 9.19 6618.67 4710.67 742.88 0.00 0.00 0.00 0.00 8770.00 48.36 12.39 6631.99 4725.32 745.67 12.00 1.27 16.00 85.00 10587.62 55.51 275.03 7929.42 5571.02 49.24 4.00 0.39 -5.36 -121.12 11858.29 55.51 275.03 8649.00 5662.83 -994.02 0.00 0.00 0.00 0.00 F-19A T1 12037.03 91.14 272.00 8699.48 5672.73 -1162.19 20.00 19.94 -1.69 -5.19 12265.71 91.14 272.00 8694.91 5680.72 -1390.68 0.00 0.00 0.00 0.00 12298.81 92.02 271.00 8694.00 5681.58 -1423.76 4.00 2.64 -3.01 -48.74 F-19A T2.Rev 1 13011.88 91.99 258.64 8669.00 5617.40 -2132.10 1.73 0.00 -1.73 -89.92 F-19A T3 Rev 1 13208.96 87.59 265.18 8669.73 5589.70 -2327.07 4.00 -2.23 3.32 123.89 14022.99 87.59 265.18 8704.00 5521.42 -3137.50 0.00 0.00 0.00 0.00 F-19A T4 Survey MD Intl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE ToollCo ft deg deg ft ft ft ft ft deg/100ft ft ft 8750.00 48.11 9.19 6618.67 6554.67 3728.60 4710.67 742.88 0.00 5978693.46 653295.79 Start Dir 1 8770.00 48.36 12.39 6631.99 6567.99 3739.96 4725.32 745.67 12.00 5978708.16 653298.28 Start Dir 4° 1 8800.00 47.75 11.01 6652.04 6588.04 3756.72 4747.17 750.20 4.00 5978730.10 653302.37 MWD+IFR 8900.00 45.84 6.18 6720.52 6656.52 3813.93 4819.19 761.13 4.00 5978802.32 653311.83 MWD+IFR 9000.00 44.14 1.06 6791.27 6727.27 3873.00 4889.69 765.64 4.00 5978872.90 653314.90 MWD+IFR 9100.00 42.69 355.64 6863.93 6799.93 3933.64 4958.34 763.71 4.00 5978941.48 653311.57 MWD+IFR 9200.00 41.50 349.93 6938.16 6874.16 3995.56 5024.79 755.33 4.00 5979007.75 653301.85 MWD+IFR 9300.00 40.61 344.00 7013.59 6949.59 4058.44 5088.73 740.56 4.00 5979071.36 653285.78 MWD+IFR 9400.00 40.04 337.88 7089.86 7025.86 4121.99 5149.83 719.47 4.00 5979132.03 653263.45 MWD+IFR 9500.00 39.79 331.65 7166.59 7102.59 4185.90 5207.82 692.15 4.00 5979189.43 653234.96 MWD+IFR 9600.00 39.88 325.41 7243.41 7179.41 4249.85 5262.39 658.74 4.00 5979243.31 653200.45 MWD+IFR 9700.00 40.29 319.23 7319.95 7255.95 4313.53 5313.29 619.41 4.00 5979293.39 653160.10 MWD+IFR 9757.91 40.68 315.71 7364.00 7300.00 4350.17 5340.98 594.00 4.00 5979320.56 653134.13 THRZ 9800.00 41.03 313.19 7395.84 7331.84 4376.64 5360.26 574.35 4.00 5979339.44 653114.09 MWD+IFR 9900.00 42.08 307.37 7470.70 7406.70 4438.86 5403.09 523.77 4.00 5979381.22 653062.65 MWD+IFR rent Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 Time: 16:17:06 Page: 3 Field; Prudhoe Bay Co-ordinate(NE) Reference: WeIC F-19, True North Site: PB F Pad Vertical (TVD) Reference: 35.5GL+28.5KB=64. 0:64.0 Well: F-1 9 ' Section (VS) Reference: Well (O.OON,O.OOE,330:39Azi} Wellpath: Plan F-19A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim ` TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ', ft ft deg/100ft ft ft 9950.51 42.71 304.53 7508.00 7444.00 4469.86 5423.07 496.20 4.00 5979400.64 653034.68 TKNG 10000.00 43.40 301.81 7544.16 7480.16 4499.90 5441.55 467.92 4.00 5979418.54 653006.03 MWD+IFR 10100.00 44.99 296.54 7615.88 7551.88 4559.44 5475.47 407.07 4.00 5979451.21 652944.52 MWD+IFR 10200.00 46.80 291.57 7685.50 7621.50 4617.22 5504.67 341.53 4.00 5979479.07 652878.39 MWD+IFR 10300.00 48.81 286.90 7752.68 7688.68 4672.93 5529.02 271.60 4.00 5979501.99 652807.99 MWD+IFR 10400.00 51.00 282.53 7817.10 7753.10 4726.32 5548.39 197.64 4.00 5979519.85 652733.66 MWD+IFR 10410.99 51.25 282.06 7824.00 7760.00 4732.03 5550.22 189.28 4.00 5979521.50 652725.26 TJF 10500.00 53.34 278.42 7878.44 7814.44 4777.12 5562.70 120.00 4.00 5979532.58 652655.74 MWD+IFR 10587.62 55.51 275.03 7929.42 7865.42 4819.31 5571.02 49.24 4.00 5979539.45 652584.84 End Dir : 1 10600.00 55.51 275.03 7936.43 7872.43 4825.11 5571.91 39.07 0.00 5979540.14 652574.65 MWD+IFR 10631.02 55.51 275.03 7954.00 7890.00 4839.64 5574.15 13.60 0.00 5979541.86 652549.15 TJ E 10700.00 55.51 275.03 7993.06 7929.06 4871.95 5579.14 -43.03 0.00 5979545.69 652492.43 MWD+IFR 10800.00 55.51 275.03 8049.69 7985.69 4918.80 5586.36 -125.13 0.00 5979551.24 652410.20 MWD+IFR 10900.00 55.51 275.03 8106.32 8042.32 4965.64 5593.59 -207.24 0.00 5979556.79 652327.97 MWD+IFR 11000.00 55.51 275.03 8162.95 8098.95 5012.49 5600.81 -289.34 0.00 5979562.35 652245.75 MWD+IFR 11063.65 55.51 275.03 8199.00 8135.00 5042.31 5605.41 -341.60 0.00 5979565.88 652193.41 TJD 11100.00 55.51 275.03 8219.58 8155.58 5059.33 5608.04 -371.44 0.00 5979567.90 652163.52 MWD+IFR 11200.00 55.51 275.03 8276.21 8212.21 5106.18 5615.27 -453.54 0.00 5979573.45 652081.29 MWD+IFR 11300.00 55.51. 275.03 8332.84 8268.84 5153.02 5622.49 -535.65 0.00 5979579.00 651999.07 MWD+IFR 11337.36 55.51 275.03 8354.00 8290.00 5170.53 5625.19 -566.32 0.00 5979581.08 651968.34 TJC 11400.00 55.51 275.03 8389.47 8325.47 5199.87 5629.72 -617.75 0.00 5979584.56 651916.84 MWD+IFR 11500.00 55.51 275.03 8446.10 8382.10 5246.71 5636.94 -699.85 0.00 5979590.11 651834.61 MWD+IFR 11558.09 55.51 275.03 8479.00 8415.00 5273.93 5641.14 -747.55 0.00 5979593.34 651786.84 TJB 11600.00 55.51 275.03 8502.73 8438.73 5293.56 5644.17 -781.96 0.00 5979595.66 651752.39 MWD+IFR 11700.00 55.51 275.03 8559.36 8495.36 5340.40 5651.39 -864.06 0.00 5979601.21 651670.16 MWD+IFR 11800.00 55.51 275.03 8615.99 8551.99 5387.25 5658.62 -946.16 0.00 5979606.77 651587.93 MWD+IFR 11858.00 55.51 275.03 8648.84 8584.84 5414.42 5662.81 -993.78 0.00 5979609.99 651540.24 7" 11858.29 55.51 275.03 8649.00 8585.00 5414.55 5662.83 -994.02 0.00 5979610.00 651540.00 F-19A T1 11900.00 63.82 274.19 8670.05 8606.05 5434.77 5665.71 -1029.87 20.00 5979612.15 651504.10 MWD+IFR 11969.92 77.76 273.02 8693.00 8629.00 5470.82 5669.82 -1095.60 20.00 5979614.93 651438.31 F-19A Faul 12000.00 83.76 272.55 8697.83 8633.83 5486.72 5671.26 -1125.24 20.00 5979615.76 651408.64 MWD+IFR 12037.03 91.14 272.00 8699.48 8635.48 5506.25 5672.73 -1162.19 20.00 5979616.48 651371.68 End Dir : 1 12100.00 91.14 272.00 8698.22 8634.22 5539.24 5674.93 -1225.10 0.00 5979617.40 651308.74 MWD+IFR 12200.00 91.14 272.00 8696.22 8632.22 5591.64 5678.42 -1325.02 0.00 5979618.85 651208.78 MWD+IFR 12265.71 91.14 272.00 8694.91 8630.91 5626.07 5680.72 -1390.68 0.00 5979619.81 651143.09 Start Dir 4° 1 12298.81 92.02 271.00 8694.00 8630.00 5643.17 5681.58 -1423.76 4.00 5979620.00 651110.00 F-19A T2. 12300.00 92.02 270.98 8693.96 8629.96 5643.77 5681.61 -1424.94 1.73 5979620.00 651108.82 MWD+IFR 12400.00 92.02 269.25 8690.44 8626.44 5693.32 5681.81 -1524.88 1.73 5979618.17 651008.91 MWD+IFR 12500.00 92.02 267.52 8686.92 8622.92 5740.23 5678.99 -1624.77 1.73 5979613.32 650909.10 MWD+IFR 12600.00 92.02 265.78 8683.40 8619.40 5784.43 5673.15 -1724.53 1.73 5979605.45 650809.48 MWD+IFR 12700.00 92.01 264.05 8679.89 8615.89 5825.91 5664.29 -1824.08 1.73 5979594.57 650710.15 MWD+IFR 12800.00 92.01 262.31 8676.38 8612.38 5864.62 5652.43 -1923.30 1.73 5979580.69 650611.19 MWD+IFR 12900.00 92.00 260.58 8672.89 8608.89 5900.52 5637.57 -2022.13 1.73 5979563.82 650512.70 MWD+IFR 13000.00 91.99 258.85 8669.41 8605.41 5933.59 5619.72 -2120.46 1.73 5979543.98 650414.76 MWD+IFR 13011.88 91.99 258.64 8669.00 8605.00 5937.32 5617.40 -2132.10 1.73 5979541.42 650403.17 F-19A T3 13100.00 90.02 261.57 8667.46 8603.46 5967.04 5602.26 -2218.88 4.00 5979524.52 650316.71 MWD+IFR 13200.00 87.79 264.89 8669.37 8605.37 6005.83 5590.47 -2318.15 4.00 5979510.71 650217.72 MWD+IFR 13208.96 87.59 265.18 8669.73 8605.73 6009.56 5589.70 -2327.07 4.00 5979509.76 650208.82 End Dir : 1 13300.00 87.59 265.18 8673.57 8609.57 6047.70 5582.06 -2417.70 0.00 5979500.28 650118.36 MWD+IFR 13400.00 87.59 265.18 8677.78 8613.78 6089.59 5573.67 -2517.26 0.00 5979489.87 650019.00 MWD+IFR 13500.00 87.59 265.18 8681.98 8617.98 6131.49 5565.29 -2616.82 0.00 5979479.46 649919.64 MWD+IFR 13600.00 87.59 265.18 8686.19 8622.19 6173.38 5556.90 -2716.38 0.00 5979469.04 649820.28 MWD+IFR 13700.00 87.59 265.18 8690.40 8626.40 6215.28 5548.51 -2815.94 0.00 5979458.63 649720.92 MWD+IFR ent S S S S S S 8 S S S S S S S S S S S S S S S 3 S S 1 S S S S S S S S 1 S S 0 S S S S S Sperry-Sun BP Planning Report Company: BP Amdco Date: 10/25/2007 Time: 16:17:06 Page:: 4 N~eld: Prudhoe Bay Co-ordinate(NE) Reference: WeIL' f-19, True North Site: PB F Pad Vertical (TVD) Reference: 35.5GL+28:5KB=64.064.0 Well: F-19 Section (VS) Reference: Well {O.OON,O:OOE,330.39Azi) Wellpathc Plan: F-19A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft deg/900ft ft ft 13800.00 87.59 265.18 8694.61 8630.61 6257.17 5540.12 -2915.50 0.00 5979448.22 649621.56 MWD+IFR 13900.00 87.59 265.18 8698.82 8634.82 6299.07 5531.74 -3015.06 0.00 5979437.81 649522.20 MWD+IFR 14000.00 87.59 265.18 8703.03 8639.03 6340.96 5523.35 -3114.61 0.00 5979427.40 649422.84 MWD+IFR 14022.00 87.59 265.18 8703.96 8639.96 6350.18 5521.50 -3136.52 0.00 5979425.11 649400.98 Total Dept 14022.96 87.59 265.18 8704.00 8640.00 6350.58 5521.42 -3137.47 0.00 5979425.01 649400.03 41/2" 14022.99 87.59 265.18 8704.00 8640.00 6350.59 5521.42 -3137.50 0.00 5979425.01 649400.00 F-19A T4 lent WELL DETAILS ANTI-COLLISION SETTINGS ('OMP.4NY UETAILS SURVEY PROGRAM Name ~NI-S -FJ-W Nunhing F.vOng Wtihule Longitude Slor RI'Anmco Depth Fm Uepth To &wcy/PIatI Tunl Imerpolation MethoJ:MD Interval: 25.00 F-IY 14U7.54 1717.10 5977Wr%YY 652G4Y.W 711'?U'UY.I24N 148'45'41.32'_W IY DCp(h Range Flom' g75U.U11 To: 14U22.99 Cvlwlatiun MclhuJ: Mnunmm Cwvortnc 875U.U11 IJU'_?.YY PlwurcJ: F-19A Wp 111 V1'_ hIW'U IFR~MS - Muximum Runge: 1599.45 Reference: Plan: F-19A Wp 3.0 Ertor System: ISCWSA Sean Me1hoJ: Trav Cylinder Ninth F.n'ur Swtucc' F.Ililniml ~ Casing W'aming Mc1huJ: kuk~ RaeJ 160 150 125 100 75 50 25 0 2 :olour To MD PImI F-IYA - 4000 rarem weupatn: F-IY 4250 Tic w MR. 8750.00 - 4500 wg: Rcf Datum: 35.SGL~?xSk R-L4a (r1.11UN 4750 SOOO vseedun la;g~r a;gin stamng Angle N/-ti F./-W From ND 5250 33(13Y' U.W O.W _^8.511 ssoo 5750 6000 - 6250 LF.GF,ND 6500 ~ F-UG (F~UGI. Major kisk F{IG (F{ILA I, Mnjur Risk - 6750 ~ F-14 (F-Ill. Major Risk 7000 F-I % (I'Inn F-1 %AI. Major kirk F-I91F 191. NOERRORS 7250 ~ F'_I IF-'_I1. Minor l/?181 F--?IFNI IP-_^IPDII. Mim~r l/^_UU F'_4IF-'_41. Mnjur Risk F-31 (Plon F41A 1. Mnjur Risk • F-34A IF-34A1. Mnjur kick F-34AI'01 (F-1JAPn l 1. Mujur kisk F4G (F4G1. Mnjur kisk F47 (F-371, Mawr kisk F-02 (F-0?I. Mnjur Risk F-42 (F-4?AI. Mnjur Risk I'IwI F-IYA F-IYA Wp lU 75 100 ;Removed. ;an for Plans le @ No Errors 125 SF.CFION DETAILS nu Azi TVD ~NI-S ~Fl-W DLeg TFace VS~c Targ~n i.ll Y.IY GLIB L7 471 U.67 74?.86 n(xl 0.00 17?6.411 i36 12.39 6631.9Y 4725.32 745.67 I?.110 NSIMI 3739.96 150 5.51 27503 7Y?Y 42 5571.0? 4Y?4 4W -121.1? 4%IY 11 5.51 275.07 8649.00 5662.8.1 -994.0? 0.00 0011 5414.55 F-19A T1 1.14 2P_.fNl x(YY.4% 5672.71 -IIG?.IY 2U.W -5.1Y 5511E?5 I.I4 ?72.011 B6Y4.91 S68U.72 ~IJYU.66 D.W 0-1x1 S62[i 117 160 ' 0'_ 271 Ip N6Y4 W 56%I5% -14?3.76 4 W -08.74 54t1 l7 F-IYA T2.kev I I.Y9 ?58.64 86(x91;(1 561740 ?I3'_.IU 1.73 -89.Y2 SY171_' F-IYA T7 Rcvl I ._-_-_ ..7.59 245-IN %66973 SSSY.7U ~327.U7 4-W 1?3.89 LUOY.56 111 140?299 87.59 265.16 %704.fp 5521.42 4137.50 0.011 0-00 fi150-59 F-I9A T4 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SOft/in] Sperry-Sun Anticollision Report Company: BP Amoco Date: 10/25/2007 Time: 16:16:45 Page: 1 Field:. Prudhoe. Bay Reference Site: PB F Pad Co-ordinate(NE) Reference:. WeIL F-19, True North Reference Well: F-19. Vertical (T VD) Reference: 35.5GL+28.5K6=64:0:64.0 Reference Wellpath:. Plan F-19A Db: °Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are TlCefdi@u~is in this f121t1h: F-19A Wp 3.0 & NOT PLANNED P Interpolation Method : MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 8750.00 to 14022.99 ft Scan Method: Trav Cylinder North Maximum Radius: 1599.45 ft Erro r Surface: Ellipse + Casing Casing Points MD TVD Diameter . Hole Size Name ft ft in in 11858.00 8648.84 7.000 8.500 7" 14022.96 8704.00 4.500 6.125 41/2" Plan: F-19A Wp 3.0 Date Composed: 10/9/2007 Version: 12 Principal: Yes Tied-to: From: Definitive Path Summary <~___.___~.~_~_ Offset Wellpath ---- --> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD Ml) Distance Area Deviation Warning ft ft ft ft _ft PB F Pad F-06 F-06 V1 13060.74 10700.00 1526.04 194.23 1331.81 Pass: Major Risk PB F Pad F-06 F-06A V2 12008.64 10980.00 1352.89 267.13 1085.76 Pass: Major Risk PB F Pad F-14 F-14 V1 11004.24 10075.00 1271.28 356.60 914.68 Pass: Major Risk PB F Pad F-18 Plan F-18A VO Plan: F- 8780.84 9125.00 1321.84 311.10 1010.74 Pass: Major Risk PB F Pad F-19 F-19 V4 8767.59 8775.00 0.34 0.77 -0.43 FAIL: NOERRORS PB F Pad F-21 F-21 V1 13556.06 11275.00 187.32 17.55 169.78 Pass: Minor 1/200 PB F Pad F-21PB1 F-21PB1 V1 12598.19 11050.00 32.90 22.15 10.75 Pass: Minor 1/200 PB F Pad F-24 F-24 V1 Out of range PB F Pad F-33 Plan F-33A V0 Plan: F- 10317.30 9525.00 195.63 123.91 71.72 Pass: Major Risk PB F Pad F-34A F-34A V1 11420.89 12050.00 849.41 174.43 674.98 Pass: Major Risk PB F Pad F-34APB1 F-34AP61 V1 10669.66 10825.00 841.49 156.35 685.15 Pass: Major Risk PB F Pad F-36 F-36 V1 Out of range PB F Pad F-37 F-37 V1 Out of range PB F Pad F-42 F-42 V6 12082.46 10700.00 258.47 161.87 96.60 Pass: Major Risk PB F Pad F-42 F~2A V4 13830.45 10850.00 1045.49 171.30 874.19 Pass: Major Risk Site: PB F Pad Well: F-06 Rule Assigned: Major Risk Wellpath: F-O6 V1 Inter-Site Error: 0.00 ft Reference'. Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HS!)istance Area Deviation Warning ft ft: ft ft' ft ft deg deg in ft ft ft 13078.21 8667.56 10500.00 9030.99 22.46 33.73 157.37 256.52 7.000 1595.75 201.65 1394.09 Pass 13076.11 8667.58 10525.00 9050.81 22.46 33.44 156.48 255.70 7.000 1586.09 200.71 1385.38 Pass 13073.97 8667.60 10550.00 9070.59 22.45 33.15 155.58 254.87 7.000 1576.72 199.76 1376.96 Pass 13071.80 8667.62 10575.00 9090.33 22.45 32.87 154.67 254.04 7.000 1567.60 198.82 1368.78 Pass 13069.62 8667.65 10600.00 9110.01 22.45 32.59 153.75 253.19 7.000 1558.73 197.88 1360.84 Pass 13067.44 8667.67 10625.00 9129.63 22.45 32.32 152.82 252.33 7.000 1550.09 196.95 1353.14 Pass 13065.25 8667.70 10650.00 9149.20 22.45 32.07 151.88 251.47 1541.72 196.04 1345.69 Pass 13063.02 8667.74 10675.00 9168.76 22.45 31.81 150.94 250.60 1533.70 195.13 1338.57 Pass 13060.74 8667.77 10700.00 9188.33 22.44 31.57 149.98 249.72 1526.04 194.23 1331.81 Pass Site: PB F Pad Well: F-06 Rule Assigned: Major Risk Wellpath: F-O6A V2 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MI) TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12148.02 8697.26 10550.00 8889.59 17.66 66.17 175.14 263.14 4.500 1589.46 284.91 1304.55 Pass 12137.17 8697.48 10575.00 8904.99 17.61 66.18 174.52 262.52 4.500 1574.85 284.74 1290.11 Pass 12126.38 8697.69 10600.00 8920.31 17.56 66.18 173.89 261.89 4.500 1560.32 284.54 1275.77 Pass 12115.63 8697.91 10625.00 8935.56 17.51 66.18 173.25 261.25 4.500 1545.87 284.31 1261.55 Pass 12104.94 8698.12 10650.00 8950.74 17.45 66.18 172.60 260.60 4.500 1531.51 284.05 1247.46 Pass GRA Alaska Department of Natural Resources Land Administration System Page 1 of~ f ~.' ,~...{ ,, _,; -, ~. , ~~i~ts R~~;cst~~~'s ~a<,rc~t SfateCabins ~I~tu~~lr+c~es < .. . C~~~ a SE' C File Type: ADL_._____ ~ File Number: 282?8 _ ~ Printable Case File_Summ. ary See Township, Range, Section and Acreage? New Search { Yes ~ No ~__ ~ ~ _~ ~_. _ _.__. LAS il~enu I Case Abstract I Case Detail I Land Abstract ..< File: ~DIJ 2$275 ~''"~~ Search for Status Plat Updates :~s cal 11!O~/BOOS Cuszorrrer: 000107377 BP EXPLORAT[ON (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 9661 2 Case Type: '~~s? OIL & GAS LEASE COMP DNR Uuit: 780 OIL AND GAS File Loc~rtion: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/1.9/1965 Total Acres: 2560.000 Date Ir7itiutecl: 05/28/1965 Office of'Prirrtafy Respoylsibility: DOG DtV OIL AND GAS Last Traiasuctior7 Date: 12/04/2006 Case Suhhpe : (~S NORTH SLOPE La5<< Traf~sactiorz: AA-NRB ASSIGNMENT APPROVED 1~%IE'I'll~/(111: U lrJ111L~~hlp: U ~ ?N f~cl!l~~~': O I _; i~. .~~c'~71U11: ~ ~' ~S~CC'L1~)77 : iC1'2S: l)-1O ~°aPC}l ~'ir~ts /C/'Ir/1<l/1: 1_; /Ui1715/![~7.' OI~N )~Llil~'C' OI_?~', .~~c'Cllrl/l. ~~ .~~'~'llUll.ICYC'~': 6-~~) /t'I'/illal~: U TObV11S/'71/): OI ~N /~[lil~'N" OI_)I~. .ti~eCl7UN,~ i_i ~~~'~'l/U71 _(<7'('1'; O-((~ ll~ri~lia~~: U Totit~~tship: UI~N 2~n1~~~: C11 ~1~: ~~c°c~li~ui: ~~ S~r~~[ir~jt_Icr2s: 640 Legal Description 0~-?b'-I y6> * ` ` S:dLE A'(~TICE LEGAL DLSC'IZIPTI(~N C'1 -1- 89 T12N. R13E. CM27, 3f~. 33, 3~l 3, 560.00 Last updated on 11/05/2008. http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28278&... 11 /5/2008 Alaska Department of Natural Resources Land Administration System Page 1 of~2' ~ • ._,.- ~; -, ~r ..~ ~ r: ~°~ ~~yrc€~~`~ C~arch Sta#e Cabins ~~~ 3~~tlrc~~ r File Type: ADS `. File Number: 2828U_. ~ Printable Case File_Summ.a_ry See Township, Range, Section and Acreage? ~ New Search Yes ~ No _-_~_. __ ~_ _~~ _~.._-- -_ i SAS Menu ~ Case Abstract ~ Case Detail ~ Land Abstract _, File: AI)[, 282H11 -~ Scarch for State; Plat Updates A~ n1 l l llv'2(lOS Custonner: 000107377 BP L;XPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 985196612 Case Type: ~~ OIL & GAS LI/ASE COMP DNR Unit: 780 OIL AND GAS h~i1e Locution: DOG DLV OIL AND GAS Case Status: 35 ISSUED Status Dale: 08/19/1965 Total Acres: 2560.000 Dute Initiated: 05/28/1965 Office of prinnan.y Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype : ~°'~ NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED ~i%r~idiann: L'~ Township: 01 IN 1<<nr;~~_~.~ (113E Section: (11 section Acres: 640 a4~ar~.i, ~!_~t~ l~•f~r~licni: U Tcnnnship: O11N I~r~n"~e~: 01 ~I~; Sectiorai U' S~~~~~r~»r Acres: 640 11~~~ric/r~nr: U l ~,lr,i~hip: Ol 1N I~~m-,rc: (11-~ I . Secliuit.~ 1 I .ti'~~~~rir,rr Acres: 640 l~l~>~~irli~m: U Totiritship: 011N' Rrft~~~~.~ 01 ;E Secti~~n: I~ Sc~~~ri~,ir.acres: 640 Legal Description 0>-2b'-I96~ ~, x rSALE NOTIC"E LLGAL DE.SC'RIPTION "~Y CI-I- 9I TIIN, RISE, U11~I1, ?, 11. I? 2,60.00 0,~-0~-I1~5'? *** LI,SBZ/R-VEpARTIC'IPATI,V~~.9RE.~I DESC'RIPTIO%'~''~** T. 11 N.. R.13 E. , U. NI. SEC"PION 1. ALL 6~O~GRES SECTIO~~' 12: ALI_ 6~tD~~RE.S' http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28280&... 11 /5/2008 Alaska Department of Natural Resources Land Administration System Page 1 of~ f ",.,~ ,s~; ' 3-: ~ „,~ ~ , ~r~~:,, : I~~. t~ ~~corder's Se;~t~cia State Cabins Ca1~tu~~ 3~Dt1 S _.. ,_~.z Alaska DNR base ~urnmary File Type AD~_ _ File Number: ____ ?$27?___ ~ Printable Case Fite_Summary See Township, Range, Section and Acreage? New Search ~" Yes ~ No _. _.__._..___~___.. t.AS Menu I Case Abstract I Case Detail I Land Abstract M, 1-~le: AI)L 28277 _ ''~ Search for Status P€af ~J}~dates ~~ of I ] i(1~2UUS Customer: 0001.07377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 12 CaseTyPe: `~~. OIL & GAS LEASE COMP UNR Uj~it: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 :ISSUED States Date: 08/19/1965 Total Acres: 2560.000 Date Initiate« ': 05/28!1965 Office of Primar~~ Respofasihility: DOG D1V O[L AND GAS Lust Transaction Date: 12/04/2006 Case SuhtyPe : ~ NORTH SLOPE Last Transaction: AA-NRB ASSIGNMF,N~f APPROVED Mcriclicrn: U I~nvnship: 012N Ran~~~: (113E Section: ~~ .5'e~clronAcres:l>~-(ll Search Pia~s Me~r•i~licrrt: U 7~nrnt~rtip: 011\ l~urt,~rc°.~ (113E Sc~c•II~~n.~ ~(i ,~'~~~~Iirur.~Icrc~~~: 6(~) tl~~r~i~/icrn.~ l~, Totivnshi~~ 01~1~~ I~urttrc: U131~; S~~c~<<~~t.~ ~~ SectiorzAcres: (i(I) ~~c'Y!cl~1Cln: U T01VI1SIZlI): O1 ~1V' ~~tl/l~c'.' O ~ j~, Seet7r)/7' _i t) ,SeClIO7JACrC?S: 640 Lcga1 Descrip ion OS-?8-1965 "* ^` SALE 1VOTICE LEGAL DESCRIPTION ~ ~~ CI ~- b'~S' TI ?N, R13E, Ull%I2~. 26, 3~, 36 ?, ~ 60.00 ACRES. 0=l-DI-II'7 *'* UNITIZED LEGAL DESCRIPTION ** ~` PRUDNOF, B.~~Y' UNIT T12N, R13E, UM26, 35, 36 http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28277&... 11 /5/2008 N ~ TRANSMITTAL LETTER CHECKLIST WELL NAME _ ~~l~ F- 9~ PTD# 070 ~ /~.3 _ / Developments ,_,_ Service ,_ Exploratory Strati ____ Non-Conventional Welt t"~phic Test FIELD: _ f~.~uDNDE /~'AY POOL: _ f ~u,O.~v~' %~AY ~~ Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS \1yHpT (OPTIONS) ~~. FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing (If last two digits in well API number are Permct No. . AP[ No. SO- between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), ail records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PIS and APt number (50 = _) from records, data and Iogs acquired for well SPACING The permit is approved subject to full compliance with ZO AAC EXCEPTION 25.055. Approval to perforate and produce /infect is contingept upon issuance of a conservation order approving a spacing exception. assumes the liability of any pirotest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are frst caught and 10' sample intervals tluou ct zones. Non-Conventional pteaSe note the following special condition of this permit: Well roduction or P production testing of coal bed mejhane is not allowed for (name of weld unfit after LComQaov Narae) has designed and implemented a water we!! testing program to provide baseline data '' on water quality and quantity. (Como_ nv Name) must contact the Commission to obtain advance approval of such water well testing nmo~rn Rev: 1/! !2008 VIf~LL PERMIT CHECKLIST Field & Pooi PRUDHOE BAY, PRUDHOE Oil • 640150 Well Name: PRUDHOE BAY UNIT F-19A Program DEV Well bore seg ^ PTD#:2081730 Company BP EXPLORATION^ALASKA) INC Initial ClassfType DEV! PEND GeoArea 890 Unit 11650 On1Off Shore 4n Annular Disposal ^ Administration 1 Pe[miifs~atta~hed----------- - ----- - - - -- ------ - ~ --- -- -- ----- -- -- - ------ -- - -- - 2 -Lease numberappr°priate- ------ - -- - - - ------ Yes- --- -- ----- ----------- --------- -- 3 Unigr~eYVell-name and number--- - --- ---- --- - -Yes ---- ----- - - -- - - - - - -- ------ --- 4 Well locatedin_a_de_fined_pool--_--__-._-_____--_________ _________Yes_-- --Prudhoe BayOiiPool._---,---_.--_---_--_--_-----------________--_ -- 5 WeIIIQCatedp[operdistanref[omdrihingunitboundery------,------- ----_---Yes---- ------------------------------------------------_------- 6 Well locatedD[oRerdistancef[omRtherwelis--------------------- --------Yes----- ----------------,-,---------------------- -------------------------- 7 Sufficientacreageayailablelndrillimgunit..------------------- ---_-__--Yes----- --2560 acres.-------------__--._______________-___________-----. - _-- 8 If-deviated, is weilbore Rlat_included - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - 9 Operato[onlyaffectsdRa~Y------- - - ---- - --- --- Yes ----- -- ------ - - - ------- ------------ - - - 10 0-pe[atorhas_appcopriatebo[~linforce------------------------ --------Yes----- --BlanketBond#6194193,-------------------------------------------------- 11 Pem]itcambeissuedwlthoutconservationorder_--____________- -__--__--Yes---.- --------------------------------------------------------------____-- Appr Date 12 Permitcanbeissuedwithoutadmioisi[ative_approval--------------- ---------Yes----- ------------------_-_------------------------------------.--------- ACS 111512008 13 CanparmitbeaRprovedbBfOrE15-daY-~'ait--------------------- ---------Yes_--- ---------------------.--------------------------------------------- 14 Weil located withinarraandstraiaeuthorizrdby_injection9tde[#(put1O#in_comments)(For- NA_____ _______________________________.________..__-_____-_____________ 95 AIIweU&wiihin114_mileareaofteyiewidemiified(FOrserv_ieeweilonly)-__- _________ NA---__ -_____________________________________________-___--__--____________ 16 Pte•producsdinjector.durationofpreptoductionlessihan3months_(Forservicewe4only)__NA___-_ ____________-___________________________--------------___--- 17 Nonconven, gas_c9nf9-ms t2 AS31,05.030(k1.A).(42.A-D) ~ - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Cor~ducto[st[inl~RrQvidQd------------------------------- --------- NA------ --CGnduRtorset-inF-191181.106),------------------------------------------------- 19 SurfacecasingprotecisailknownUSDWs_--__-____________-_ _______NA-____- --Allaquifer&exempted,AEO1.--._________-------------___________ - --- 20 CMT-vo(adequaletocitculate_on conductor&surfcsg---__________ ________NA______ __S~arfacecasi>tg set inF-19.______________________________________________ 21 CMT-voladequate toile-in longshimgtoslrrfcsg---._-_________. _____-NA______ __Prodyction_casimgset in_F_•19,-.________.__-__---_-----___-___.__-____-_. 22 CM[-will coyer all knuwn_productivehurizons_________--___-_-- ___-__--__No______ __Slottedliner completion R~mned,________________-__._._____-_.-____ -- 23 Casing designs adequatefo[C,TB&_permafrost - -- - -- -- -Yes- -- --- ------ ------- ------- - ------ -- ----- -- 24 AdequAte-tankage-or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Rig equipped with steel pits. No-reserve pit planned.- All waste_i9 approved disposalwell(s), - - - - - - _ - - _ - - - 25 ICa-re-drill!,has_a10.403forabandonmentbeemapproved_____________ _--_-___Yes_-__- --307-355-------------------------------------------_.--------- _ _-- 26 Adequate welibore separation p[oposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - _ _ _ _ _ Proximity analysis perfo[med, Nearest segment is P&A p°rtign Qf F,19 and paths-dive[g_e.- - - - - - - _ - - - _ - - _ 27 If dive[ter-rQ4uited, dues it meet regulaii9ns_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _KA_ _ _ _ _ _ _ _ t39P star~k.will already.ba in place, _ _ _ One otherdeep aPP[oach in zone, _ _ - _ - - - _ , _ _ _ _ _ - - _ - - _ Appr Date 28 Dnliimg fluid program schematic & equip list adaquate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Mapmmm expected formation pressure 7,0 EMW._ MNt planned Up to 11.5ppg in HRZ-and 8.5ppg in zone. _ _ TEM 1!10!2 29 BOPIS,_dotheymeetragulation---------- --- ----- - --- _-Yes----- --- - - - - - - - - -- 30 BODE-press rating app[opriate; test to_(put prig is comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - . _ - _ MASP calculated of 2320 psi. 3500-psi-BOP testplanned, _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ - 31 Choke-manifoidcumpligsu.+lAPI_RP-53 (May 84)-----.---------- --------Yes----- ------------------------------------------------------------------- 32 Workwilioccu[whhoptoperationshutdown_-----______--_--___ __ - Yes----- --------------------------------------------------------------____-- 33 Is presence of H2S gas probablr+_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - _ - - - _ HAS is reported,at F pad. _Mud-should preclude H2S on tig._ Rg has sensors and alarms. _ _ _ 34 Mechanical-comditlom of wells within AQR verified (For service weU only) - - - - - - _ - - - _ - - PtA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --------------------------------------------------- Geology 35 permiteam be issued wlo hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ Max IBvel H2S un F pad is 1ti0ppm on well-F-24 (_5115107), - - - - - - - - - _ - - - _ - - - _ - - - - - - _ _ - - _ - - _ 36 Data-presented onRoteniialoverpressurezones------------------- --------- NA____-_ _-___--____________________________.___...------...------.-____-- Appr Date 37 Se'tsmicanalysisofshallowgaszomes__________________-___- ____.____ NA___._ ___-_ ----------------------------------------------------------------- ACS 1U5/2008 38 Seabed_comdltionsunrey_(ifoff-shore)------------------------- ------- NA______ -- 39 Comtecinamelphonefotvreekly_P_ro9tessreports[exploratory9nlyj-------- ---------Yes----. ._EliVazquez-5S4.5918.----------------------..--.------.---------------- Geologic Date: Engineering Date P Date Commissioner: Commissioner: Co ssr i