Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout207-173 Maunder, Thomas E (DOA) From: Amber Babcock [amber.babcock@fepsi.com] Sent: Tuesday, September 01, 2009 2:45 PM To: Maunder, Thomas E (DOA) Cc: Bill Penrose; Regg, James B (DOA) Subject: RE: 2008 Site Inspections -- Follow up • Page 1 of 3 ~ ©~ ~~ 1s a~~- x'13 << /1 ~ ~~~_~~~ Attachments: Tofkat Pad & Ice Road Clean-up Photo Summary.pdf; 2008 Site Cleanup Field Summary.pdf; North Shore Pad & Ice Road Clean-up Photo Summary.pdf Tom, Please find attached the field summaries for Tofkat and North Shore along with field documentation. This summary was submitted to Brooks Range Petroleum, and it was our understanding that they were going to submit a report directly to the AOGCC. I will communicate with Brooks Range Petroleum to assure that proper documentation is filed in a timely manner for future work. Please let me know if you require anything further. Thank you, Amber Babcock ~,< ~;,~~,~~ i(~, ~ - ,~~~ From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, August 28, 2009 11:10 AM To: Amber Babcock Cc: Bill Penrose; Regg, James B (DOA) Subject: RE: 2008 Site Inspections -- Follow up Amber and Bill, I have examined our files and do not find any information regarding the site inspections conducted at the end of August 2008. I presume you have information similar to what you sent for Altamura. I'd appreciate if you could send the information you have. Tom Maunder, PE AOGCC From: Maunder, Thomas E (DOA) Sent: Friday, August 28, 2009 10:52 AM To: 'Amber Babcock' Cc: 'Bill Penrose'; Regg, James B (DOA) ~-~ " Subject: RE: 2008 Site Inspections Thanks Amber. We had that letter in our file. As I noted in my origiressage to Bill (text attached at end), the last item in our file was your email of August 22, 2008 regarding rescheduling the site visit due to weather and other issues. It appears that no information was submitted regarding the site inspection that was ultimately accomplished until your message of August 27, 2009. There appears to be a "gap" here and I will work to get a message out to those operators/contractors conducting site inspections. In this case, the 407 was submitted May 16, 2008 according to the document copy you emailed this morning. Although we did have an Inspector out there, I feel the operator/contractor should still submit a report of the inspection much like the protocol for BOP and safety valve tests. In cases such as this, the protocol I see as appropriate would be to submit the information attached to a 404. I will plan to get a message out outlining that protocol. 9/3/2009 Page 2 of 3 Regarding the other site inspections conducted at the same time, I suspect that information regarding the inspections of Tofkat or North Shore may also not have been submitted. You may wish to check your records. I will examine ours and get back to you. Call or message with any questions. Tom Maunder, PE AOGCC From: Amber Babcock [mailto:amber.babcock@fairweather.com] Sent: Friday, August 28, 2009 10:33 AM To: Maunder, Thomas E (DOA) Subject: RE: 2008 Site Inspections My apologies. Attached is the AOGCC letter. I do not have a signed version, Chuck Rowe submitted directly. Thanks, Amber From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, August 28, 2009 10:30 AM To: Amber Babcock Subject: RE: 2008 Site Inspections Amber, You mention a letter to AOGCC. You included a letter to BLM, but I don't find one to AOGCC. Thanks, Tom From: Amber Babcock [mailto:amber.babcock@fairweather.com] Sent: Thursday, August 27, 2009 9:42 AM To: Maunder, Thomas E (DOA) Cc: Bill Penrose Subject: RE: 2008 Site Inspections Good morning Tom, Bill Penrose forwarded me your request regarding a site inspection on the Altumara #1 well. This site was inspected, on August 29, 2008. Chuck Scheve of the AOGCC inspected the site location. I am attaching the field summary, photo documentation and Anadarko's letter to the AOGCC (I do not have a signed version, sorry). Please let me know if you require any further documentation. Thank you, Amber Babcock Amber Babcock Logistics Supervisor Fairweather E & P Services, Inc. 2000 E. 88th Avenue, Suite 200 Anchorage, AK 99507 Office: 907-258-3446 Cel I: 907-602-0304 From: Maunder, Thomas E (DOA) 9/3/2009 Page 3 of 3 Sent: Thursday, August 27, 2009 8:09 AM To: 'Bill Penrose' Subject: 2008 Site Inspections Bill, I was reviewing some files, Altamura #1 was one and the most recent information in the file is about from a year ago. It is an 8/22/08 email from Amber regarding the delay in some joint site inspections for Brooks Range and Anadarko. I expect the site inspections were accomplished, however I don't find anything in the file. Can you help me here? Thanks much. Tom Maunder, PE AOGCC 9/3/2009 Brooks Range Petroleum Tofkat Pad & Ice Road Site Clean-up & Inspection August 2008 • • • Tofkat pad at the start of clean-up activities ~- x.. ~~ ~. .. ~~ x ~~ - a`~ ~ ` ~ `;, ~`. ,, '~, ,, .~s ~. ~ ;. • Tofkat pad at the start of clean-up activities • Tofkat wellhead excavation berm at the start of clean-up activities C~ CJ Tofkat pad and ice road after clean-up. Photo taken during inspection. Photo courtesy of AOGCC =z 00 o~ 0 1 ~ ~ o O O (~ n ~ O ~. ~~-h Orq N J x n C r"h Q T~ 1 V st a ~, '; : f, ~ ~~ ' '~ p ~ ~ ,~ ``~~ '"'" ~ ~ - a~. ~ ~ > r ~~ 4~"k$ ~t~ . ~ ~ ~ a. X46 aIC ~: ~;r ~ ' -~ , TM ~~ f. ~: ~. '~ b i. ~ ~ ~ ,~ ~ ~ i '~ . ~ a:.~/ ` F ~ .T 'F fi .) i~ 4r h . ~ .. • Ar S . j ~ B~» i~ . > Y(~ta ?f.. ~ 3 ~a t 9~ t 13 ~, ~„ ~ J j i ~.;, ~ , y , ~` k r ',~~~ ~f~ ~ ~" ~ ~ ~ ~ ~ :~ x X{.t ~ ~..51 ..'~9 ~~ ~'rt # ~ h , 'Pr: % ~[ ~}4~ ~ ° ~ +t.' 4~i e •~ „g'~r I ~ qtr, ~ ,~ ~„m ~ ~ ~s sy~s - .~ d S~ t ~ /'~ ypp v` T' N` gS std t.s"~ ~ .. ~.~. y$f 4y~ ;+A a ~ x~ -. ' ?~ ,~ '~ ~. ~ • • E & P SEAlICES, INC. Brooks Range Petroleum Corporation North Shore and Tofkat Summer Clean-Up Work Field Activity Summary Submitted by: Amber Babcock, Fairweather E&P Services, Inc. August 26, 2008 The North Shore site was accessed by helicopter with two personnel. A vehicle was staged at S-pad with two additional personnel (due to weight restriction on the helicopter) that were later transported to the site. The clean-up crew picked up debris on and around the pad area. The helicopter transported 10 sling-loads of material to the vehicle staged at S-pad to include large timbers, one 3.5"diameter piece of tubing and several bags of miscellaneous debris. August 27, 2008 Equipment was obtained to cut the timbers and tubing to manageable sizes, to allow transport by vehicle to Deadhorse for disposal. A crew of three and equipment mobilized to S-pad and loaded the cut debris onto the vehicle. Two additional personnel performed stick picking of the ice road route. Approximately 50 helicopter landings were made along the route. The weather deteriorated midday and delayed operations from Noon until 5:00 PM at which time stick picking activities resumed. August 28, 2008 A crew of four personnel continued performing stick picking along the ice road route. Approximately 301andings were made along the route and at the pad area. Flight hours = 3.2. August 29, 2008 A site inspection via helicopter was performed by Gerald Nayakik with the North Slope Bureau, John Easton with the State of Alaska Department of Natural Resources and Chuck Scheve with the Alaska Oil and Gas Conservation Commission. Some additional debris (11 items) was located during the inspection. 2000 East 88t~' Avenue, Suite 200 • Anchorage, Alaska 99507 • (907) 258-3446 • Fax (907) 279-5740 August 30, 2008 The Tofkat site was accessed by helicopter with two personnel. A vehicle was staged at DS2L pad with one additional person that was later transported to the site. The clean-up crew picked up debris on and around the pad area. Three sling loads of debris were transported from the site along with several bags of debris. August 31, 2008 The Tofkat site was accessed by helicopter with two personnel. A vehicle was staged at DS2L pad with one additional person that was later transported to the site. The clean-up crew picked up debris along the ice road route. Several bags of debris were transported from the site. Photo documentation is unavailable due to equipment failure. A site inspection was performed by Gerald Nayakik with the North Slope Bureau and Chuck Scheve with the Alaska Oil and Gas Conservation Commission. Mr. Scheve has agreed to submit data to John Easton with the State of Alaska Department of Natural Resources. One additional item of debris was located during the inspection. End of report ~~~~ ~, ~, m. ,,,~, ~~ ~. ~ ~ ~~T:« ~' MICROFILMED 6/30/2010 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE.. C:\temp\Temporary Internet Files\OLK9\Microfilm_Marker.doc C~ ~~r DATA SUBMITTAL COMPLIANCE REPORT 4112/2010 Permit to Drill 2071730 Well NamelNo. TOFKAT 1 Operator BROOKS RANGE PETROLEUM API No. 50-103-20567-00-00 MD 13174 TVD 7713 Completion Date 3/18/2008 Completion Status P&A Current Status P&A UIC N REQUIRED INFORMATION Mud Log Yes Samples No Directional Survey Ye DATA INFORMATION Types Electric or Other Logs Run: Mud log - MWD Directional - LWD: GR/RES/Neut/Dens WL: CS/DSI/M (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments Induction/Resistivity Induction/Resistivity Induction/Resistivity I nd~uction/Resistivity C Las 16092F.~See Notes Rpt Directional Survey pt See Notes ED C ~Asc Directional Survey ~ Log Sonic Report: Final Well R 5 Col 113 13174 Open 4/5/2008 TVD Vision Service 3-Mar- 2008 2 Col 113 13174 Open 4/5/2008 TVD Vision Service 3-Mar- 2008 2 Col 113 13174 Open 4/5/2008 MD Vision Service 3-Mar- 2008 5 Col 113 13174 Open 4/5/2008 MD Vision Service 3-Mar- 2008 113 13110 Open 4/5/2008 ASCII, EWR TVD and MD logs in PDF and PDS graphics, Performance worksheets and Surveys. 0 13174 Open 0 0 Open Schlumberger Operations Summary 0 13174 Open Dir Survey on 16092 5 Col 3800 11300 Open 4/25/2008 Sonic Vision Best DT 19- Mar-2008 0 0 Open 5/19/2008 Gen Info, Daily Sum, Lith, Morn Report, Bit Rec, Mud Report, Show Report DATA SUBMITTAL COMPLIANCE REPORT 4112/2010 Permit to Drill 2071730 Well Name/No. TOFKAT 1 Operator BROOKS RANGE PETROLEUM API No. 50-103-20567-00-00 MU lSl /4 ' ~ VU ~ /"13 l.OmpleilOn UBLE 3/ Ib/LVVb i,vrnpieoon ~iaius row lrulICI1L JtGLUJ rah ~i~ iv ED C 16267 ee Notes 0 0 5/19/2008 ADI, EOWR, Show Reports and Mud Logging data in Excel, PDF, and EMF graphics og Mud Log 2 Col 0 13174 Open 5/19/2008 MD Mud Log og Mud Log 2 Col 0 13174 Open 5/19/2008 TVD Mud Log Log Mud Log 5 Col 0 13174 Open 5/19/2008 MD Mud Log Well Cores/Samples Information: Name Sample Interval Set Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? / N Chips Received? ~iQ~ Formation Tops Analysis Y'y-td' Received? Comments: Compliance Reviewed By: Date: C~ L~ Page 1 of 2 Maunder, Thomas E (DOA) From: Amber Babcock [amber.babcock@fairweather.com] Sent: Friday, August 22, 2008 10:39 AM To: Maunder, Thomas E (DOA); Weaver, Aaron A (DNR); Schultz, Gary (DNR); gordon.brower@north- slope.org; Lynch, Leon C (DNR); Schmitz, Steven (DNR); Waska Williams; Byrne, Laurence C (DNR); Crisp, John H (DOA); Scheve, Charles M (DOA); Regg, James B (DOA); Donna_Wixon@ak.blm.gov; Easton, John R (DNR) Cc: Weissert, Robin; Jim Wnegarner Subject: RE: Brooks Range & Anadarko -Joint Site Inspections ao~ - ~°~~ Good afternoon all, Due to weather and scheduling of helicopter use it is likely that agency inspections of Tofkat, North Shore and Altamura may be pushed back one day. We are working diligently to keep on track for Aug. 28th; however we would like to make sure that your personnel are available on Aug. 29th in the event that the inspection is delayed by one day. Please confirm your (or your designees) availability on Aug. 29th I have the following people scheduled: NSB -Gerald Nayakik, Cell: (907) 878-2193 DNR-John Easton, Cell: need AOGCC -Chuck Scheve, Pgr: (907) 659-3607 (pending confirmation) BLM -Donna Wixon; Iridium 011-8816-414-31120 -may not be able to attend Thank you, ~Amber From: Amber Babcock Sent: Wednesday, August 13, 2008 4:41 PM To: (tom.maunder@alaska.gov); Aaron Weaver (aaron_weaver@dnrstate.ak.us); Donna Nixon (dwixon@blm.gov); Gary Schultz (gary_schultr@dnr.state.ak.us); gordon.brower@north-slope.org; Leon Lynch (leon_lynch@dnr.state.ak.us); Steve Schmitr (ss@dnr.state.ak.us); 'Waska Williams' Cc: 'Weissert, Robin'; Tim Winegarner Subject: Brooks Range & Anadarko -Joint Site Inspections Good afternoon all, Fairweather E & P Services, Inc. will be coordinating site clean-up, agency visits and other activities at various locations throughout the North Slope on behalf of Brooks Range Petroleum Corporation (BRPC) and Anadarko Petroleum Corporation. • Brooks Range Petroleum Corporation -Tofkat and North Shore Drilling Exploration Sites • Anadarko Petroleum Corporation -Altamura P&A Site We would like to invite an inspector from your agency to visits all three sites on August 28, 2008 departing from Deadhorse. The attached document provides site locations and details of the planned activities for your review. Please respond at your convenience, with the requested information in the attached document to assist with $/13/2009 ~ i Site Cleanup ~ Agency Visits for: Brooks Range Petroleum Corporation (Tofkat Exploration Sites) 8 dc,~,Pet_ ro~leu, `m Co r (Alta Fairweather E & P Services, fnc. will be coordinating site clean-up, agency visits and other activities at various locations on the North Slope on behalf of Brooks Range Petroleum Corporation (BRPC) and Anadarko Petroleum Corporation in late August 2008. BRPC and Fairweather have contracted with Air Logistics to provide air transportation in a Bell 206E helicopter (maximum of six passenger seats, however weight and balance restrictions may limit the payload}. The helicopter is contracted from August 26"' through August 30"'. • Fairweather will conduct atl clean-up activities at Anadarko's Altamura plug and abandonment site. • Fairweather is coordinating with and will assist BRPC as requested for clean-up activities at their Tofkat and North Shore drilling exploration sites. Primarily this will consist of scheduling agency visits and coordinating helicopter flight operations as needed. Following is a general summary of the intended project activities; and therefore is subject to change as necessary to complete the project objectives. Altamura is located approximately 20 nm a of a o utilized the ConocoPhillips annual Alpine ice road w ' eir Rene cation) as the origination point #o ice road. Anadarko built a six mile spur from the Conec ' "'s-ice by 275 foot ice pad to support their well plugging and abandoning operations. Tofkat Exploratory Drilling Site (BRPC) T'e~k.~k `~~ A a~~S'03-~ „~_,~, Tofkat is located approximately'/ mils east o the Colville ever. Road access to the ice pad was provided ~.;5 ~~~ by a half mile ice spur road that was connected to ConocoPhillips annual Alpine ice road. Both the pad area and spur road will be cleaned and inspected. The North Shore ice pad location is north o - field. A h Shore ice pad was provided by asix-mile-Ion bus south of - a rea a ane and inspected. 2000 East SS's' .1~~enue, Saite 200 • Ancl~ora~!e. ,Alaska 99507 ° (907) ZSR-3~4f • Fax (907) 279-5740 E~~ IVEI? ~~~ ~ ~ coos Brooks Range Petro I e u ~~ska 4ii ~ ~~~ ~~,~~. Comm-ssio- a subsidiary of A VCG, LLC Anchorage 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907)339-9965 * Fax (907) 339-9961 May 5, 2008 Mr. Dan Seamount, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Well Completion Report Brooks Range Petroleum Corporation: Tofkat #1 (PTD # 207-173 / P&A Sundry # 308-074) Dear Commissioner Seamount, Brooks Range Petroleum Corporation hereby submits its Well Completion Report for the work performed in drilling, plugging and abandoning its Tofkat #1 exploration well on the North Slope. Please find enclosed the following information for your files: 1) Form 10-407 Well Completion or Re-completion Report and Log 2) Well As-Built Survey 3) Wellbore Schematics 4) Well Operations Summary 5) Directional survey for the final wellbore Copies of the mud log and all LWD, MWD and wireline logs run will be submitted under separate cover as they become available. If you have any questions or require additional information, please contact me at (907) 339-9965 Sincerely, RANGE PETROLEUM CORPORATION Bart Armfield Vice President - cc: Jim Winegarner -Brooks Range STATE OF ALASKA jv,~.,q~ ~ ~ ZQQ$ ALAS~OIL AND GAS CONSERVATION COMMI LION WELL COMPLETION OR RECOMPLETION REPOI~~s+~Al~O ~:L~~$' Comm(sSnA 1a. Well Status: Oil ^ Gas ^ Plugged ^ Abandoned ^ .Suspended ^ 2oaac2s.~os 2oa,~c2s.~~o GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other^ No. of Completions: 1 b. Well Class: I~ti IC Cf~92 Development ^ ExploratoryQ Service ^ Stratigraphic Test^ 2. Operator Name: Brooks Range Petroleum Corporation 5. Date Comp., Susp., or band.: 3/18/2008 12. Permit to Drill Number: ~ 207-173 (P8uA Sundry # 308-074) 3. Address: 510 L Street, Suit 601, Anchorage, AK, 99501 6. Date pudded: 2/12/2008 a 13. API Nielrit~eL' ~ o3_ZOS6'~-~ J`"' 4a. Location of Well (Governmental Section): Surface: 661' FSL 1808' FEL S11 T10N-R5E 7. Date TD Reached: 3/2/2008 ~ 14. Well Name and Number: 5~5 Tofkat 1 Top of Productive Horizon: 11,950' 2663' FSL 4,824' FEL S15 T10E R5E_ , `~~„f/ 8. KB (ft above MSL): 52.5 Ground (ft MSL): 20 15. Field/Pool(s): Total Depth: ~r ~~cl/ t7,~/ 13,174' MD 2271' FSL 522' FEL S16 T10 v-R5E ~ 9. Plug Back Depth(MD+TVD): N/A Exploratory 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 402239.10 ' y- 5934319.60• Zone- 4 10. Total Depth (MD + TVD): 13,174' MD, 7,713' TVD~ 16. Property Designation: . ADL 391013, 391014, 391015, 390676 TPI: x- 393905.00 y- 5931154.00 Zone- 4 Total Depth: x- 392922.51 y- 5930775.38 Zone- 4 11. SSSV Depth (MD + TVD): N/A 17. Land Use Permit: N/A 18. Directional Survey: Yes ~ No (Submit electronic and printed information per 20 AAC 25.050) 19. Water Depth, if Offshore: N/A (ft MSL) 20. Thickness of Permafrost (TVD): ~ .~r /277 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): rr '' Mud Log - MWD Directional - LWD: GR/RES/Neut/Dens WL: CSI/DSI/MDAT 22. CASING, LINER AND CEMENTING RECORD WT. PER DE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT CASING FT GRA TOP BOTTOM TOP BOTTOM PULLED 16" N/A N/A surface 123' surface 123' 20" grouted to surface None 9-5/8" 40 # L-80 12.5' 3857' 12.5' 3857' 12-1/4" CMTD to surface 370 bbls None 23. Open to production or injection? Yes ^ No0 If Yes, list each 24. TUBING RECORD interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET (MD) PACKER SET (MD) 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED N/A 2g, PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): Date of Test: Hours Tested: Production for Test Period Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate ~ Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity -API (corr): 27. CORE DATA Conventional Core(s) Acquired? Yes ^ No ^~ Sidewall Cores Acquired? Yes ^ No Q If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.07~1/. ~ ~. ,a ~S~ S l~F~. JUN ~ 4 2DD8 ~ ~~,~_~:,~~ , s..,-~_' :'~ Form 10-407 Revised 2/2007 ~ ' -\ CONTINUED ON REVERSE SIDE /'._ L. _ ~ ` /lad ~ Kf' /.~ ~i ~'' (y 28. GEOLOGIC MARKERS (List all formations and markers encountered): 29. FORMATION TESTS NAME MD TVD SS Well tested? Yes ~ No ~ If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to Gubik base 575 -489 this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost base 1288 -1239 Shale Wall (K-5) 3084 -2587 Nanushuk Sd 6119 -4097 C40 6447 -4274 Top Turbidites 9632 -5868 HRZ 11350 -6728 Kalubik 11688 -6902 K-1 11767 -6942 Kup C 11932 -6974 LCU 11950 -7036 Alpine C 12779 -7470 J-4 12790 -7487 TD 13174 -7713 30. List of Attachments: Wellbore schematics, pad as-built diagram, summary of operations, directional surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Bill Penrose 258-3446 Printe ame: Bart m 'eld Title: Vice President -Operations Sign Phone: 339-9965 Date: ~ Q A INSTRUCTIONS General: This form is designed for submitti a co plete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for 1 njection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 2/2007 DATE: 02-8-08 ~ SCALE: 1" _~' ~ SHEET: 1 OF 1 NOTES: 1) COORDINATES SHOWN HEREON BASED UPON AS-BUILT SURVEY CONDUCTED 01-31-08 2) ALL DISTANCES AND ELEVATIONS ARE IN U.S. SURVEY FEET 3) VERTICAL DATUM: MSL (GEOID 2006, ALASKA) 4) PROTRACTED SECTION LINES SHOWN HEREON ARE APPROXIMATE AND FOR REFERENCE ONLY "TOFKAT 1 " AS-BUILT F=- Z OI,.D vrT®FiCAT tae o too zoo SCALE IN FEET N 6 \ / > / ~ ~ ~~ ~ .~s\ "TOFKAT 1" ~ o0 -~ /~\ W z w a 06 a o~ rnz J (~/1 X p~ W ~~ O ~ ... 1 / ~. 499 i a ~ ~ ~{ 0 ~ `y4 0 ~ ~ / em'u`. ~ ~~ a~ /ZOO . ~~. O~ s F ~o~ ~~ / v~, ~~ ~~ C;\C' AGE pPQ/ ~ ~ ~ OE/ \j Nj Ej ~ / F ~pM GPMP 0 ~ Ppp 1 ~ of ~~ +I O ~pGE TOFKAT 1 HARRISON 4 BAY 1 y Creek -. ._...._ ,{gym Y r ~ ~+~ F'$~ NUIOSUT C ^r~ _ o 1 i, „~,,.w'.r l ..~ I r tt~~ .. _. ....` - ..._..-_ ~ ~. ,«~ ~: PAQ~ ~;a~ ~ , VICINITY MAP -NOT TO SCALE LEGEND ~ CONDUCTOR ALPINE RE-SUPPLY ICE ROAD N o o I ~ N ~ ~ ~ w w ~ ~ ~ ~ z z a o ~ I ~ lsosf'-~-y "TOFKAT 1"WELL LOCATED WITHIN T. 10N., R. 5 E., U.M., SECTION 11 NAD 27, ZONE 4* LAT: 70°13'48.186° N LONG: 150°47'20.709" W ~ N = 5,934,319.6 E = 402,238.8 NAD 83, ZONE 4 LAT: 70°13'47.012' N LONG: 150°47'31.902" W N = 5,934,067.65 E = 1,542,273.06 PAD ELEV = 19.8' MSL ` CONVERTED FROM NAD 83 BY NADCOM ~~~~~~~\ ~~• ~~' A~~SIi~ .~~Q'•' .'`r ~ •T 10N, RSE,UMSECTION 11 ~ / SURVEYORS CERTIFICATE ~~ T 10 N, R 5 E, UM SECTION 14 / 1~~-Oa I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE J 'KENNETH J. PINARD / STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT `~ ~~.•• p~ SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JANUARY 31,2008 + +~~ • . No. 11545 • . '~~ ~~ ill'°ROfESSIONA~ ~P~+' ma ewsr"ewnesurte m0. urx.. uarsie an Ukpeagvik Inupiat Coryoration Company BROOKS RANGE PETROLEUM DRAWN BY: LHH CHECKED BY: KJP W.O. No: 2007-217 Brooks Range Petroleum Corporation Tofkat #1 Wellbore Schematic P&A 12-1/4" he TOC 3,971 BOC 4,401 TOC 5,86 BOC 6,36 8-1/2" he TOC 9,95 BOC 12,0 • 16" conductor set at 123' MD/TVD 5/8" casing at )28'TVD, 3,898'MD LCU at 7,089' TVD, 11,950' MD Alpine C at 7,523' 'TVD, 12,779' MD ~t 7,713 TVD, 13,174'MD adb 05/01/08 Brooks Range Petroleum OPERATIONS SUMMARY Brooks Range Petroleum Corporation Tofkat 1 February 6, 2008 80' MW N/A Vis N/A Inc10.00 deg Accept rig at 0300 hrs, February 6. Move pit module, motor module, pump module and portions of pipe shed from North Shore #1 location to Tofkat #1 pad. All DP, DC and other minor components already on location. Camp is set and ready to receive personnel. February 7, 2008 80' MW N/A Vis N/A Incl 0.00 deg Wait for rig move equipment to travel from Tofkat #1 location back to North Shore #1. Hook up to rig subbase/derrick module and tow to Tofl~at. Meanwhile, move crews into camp at Tofkat and prepare rig components for mating up once subbase/derrick arrives. February 8, 2008 80' MW N/A Vis N/A Inc10.00 deg Rig subbase & derrick arrived on loc. Move road tires up into drilling position, set matting boards and herculite. Trucks returned to North Shore #1 for satellite camp and pipe shed. February 9, 2008 80' MW N/A Vis N/A Inc10.00 deg Satellite camp and pipe shed arrived. Set matting boards and herculite, spot subbase over hole. Set in place motor, pump and pit modules and pipe shed. Rig steam lines and activate same. Berm rig. Cut off conductor, install landing ring and speed head and test same to 5,000 psi. Repair gate valves in pits. February 10, 2008 80' MW N/A Vis N/A Inc10.00 deg Spot 20" annular in cellar, button up cellar. Hook up electrical, service and interconnects throughout rig. Hook up pipe skate rails, finish berming rig, clean up around rig. Test gas sensors, function test top drive and drawworks. N/U diverter and diverter line. February 11, 2008 80' MW N/A Vis N/A Inc10.00 deg N/U diverter, diverter line, diverter hydraulics and knife valve. Clear floor, perform rig repairs and maint. Function test diverter w/ AOGCC witness. P/U DP and rack back in derrick. ~ ~ February 12, 2008 827' MW 9.5 ppg Vis 283 sec Inc17.22 deg Finish rigging up. Finish P/U DP, P/U HWDP and stand back. Fill circulating system and check for leaks. Hold spud meeting w/ crew. M/U BHA, test pumps and lines to 4,000 psi. RIH, tag bottom at 123' RKB. Drill 12-1/4" hole f/ 123' to 275'. POH 2 stands to add additional BHA components. Directionally drill f/ 275' to 827'. February 13, 2008 2,059' MW 9.4 ppg. Vis 152 sec Inc137.92 deg Directionally drill 827' to 1,204'. Short trip to 180' then back to btm. Hole in good condition. Directionally drill 1,204' to 2,059, pumping nut plug sweeps for bit balling. February 14, 2008 2,557' MW 9.6 ppg Vis 174 sec Inc152.47 deg Directionally dri112,059' to 2,166'. CBU and POH -hole in good shape. Adjust BHA, change bit and RIH. Directionally dri112,166' to 2,557'. February 15, 2008 3,895' MW 9.8 ppg Vis 112 sec Inc160.69 deg Directionally drill 12-1/4" hole 2,557' to 2,700'. Repair drag chain in pits. Directionally drill 12-1/4" hole 2,700' to 3,895'. February 16, 2008 3,911' MW 9.6 ppg Vis 102 sec Inc160.69 deg Directionally drill 12-1/4" hole 3,895' to 3 911,. CBU, short trip to 2,160' and back to btm - no tight spots or fill. Pump hi-vis sweep and POH. L/D BHA. Make dummy run with casing hanger on landing jt. R/U to run 9-5/8" casing. February 17, 2008 3,911' MW 9.7 ppg Vis 55 sec Incl 60.69 deg Run 9-5/8" casing to 3,857'. M/U csg hgr and landing jt, wash csg down until hgr landed out. Circ one csg volume. R/U to cmt. While reciprocatin cg_asin~, pump 10 bbls H2O and pressure test lines. Pump 10 bbls 10.3 ppg spacer followed by 304 sx 10.7 ppg lead cement and 385 sx 15.9 ppg tail cement. Displace with mud using rig pumps. Bump plug and hold pressure at 1,300 psi for 10 min. Release pressure -floats held. Clean up cellar, R/D cementers, clear floor. Flush stack and hole fill line. N/D diverter line and diverter valve. 9-5/8" FC at 3,812', FS at 3,898'. February 18, 2008 3,911' MW 9.7 Vis 55 sec Inc160.69 deg N/D diverter and riser. Remove diverter system from cellar, bring in starting flange and multi-bowl wellhead system. N/L7 and test starting head -test failed. Re-torque and re- test - NG. Call for wellhead specs and serial numbers, bring more tools from KRU shop. N/D wellhead, remove seal sub. N/U wellhead and torque to spec. N/U adapter flange, lift stack off, replace API rings on upper and lower mud cross, set stack on wellhead, N/U and tighten all three flanges, hook up kill line and prepare to test casing to 3,000 psi Page 2 of 7 Operation Summary: Tofkat 1 • ~ (procedure approved by AOGCC rep on location). Pressure test casing and wellhead to 3,000 ,psi for 30 minutes - og_od test. ~- February 19, 2008 3,911' MW 9.7 ppg Vis 55 sec Inc160.69 deg N/LJ remainder of BOP stack. Test BOPE to 250/5,000 psi, annular to 2,500 psi. Test witnessed by AOGCC rep. M/U BHA, RIH to 955'. P/U DP while RIH to 3,805'. Tag cmt, set down l Ok lbs. Drill to FC at 3,812'. Circ drilled cmt out of hole and test casing to 3,000 psi. Drill out FC and cmt to 3,840'. February 20, 2008 3,931' MW 10.1 ppg Vis 100 sec Incl 60.69 deg Finish drilling out shoe track and rat hole to 3,911'. Displace spud mud out of wellbore with oil-base mud. POH, standing back DP. M/U drilling BHA and RIH, picking up DP off rack. Drill 20' of new hole to 3,931'. Balance mud and conduct leakoff test to 15.3 ppg EMW. February 21, 2008 6,100' MW 10.0 ppg Vis 118 sec Incl 59.27 deg Directionally drill 8-1/2" hole 3,911' to 4,898'. Short trip to shoe at 3,897' and back to btm -hole in good shape. Dri114,898' to 5,860'. Short trip to 4,897' and back to btm. Minor tight spots at 5200', 5080' and 4900' -went away after working. Drill 5,860' to 6,100' February 22, 2008 7,785' MW 10.0 ppg Vis 90 sec Incl 59.01 deg Directionally drill 8-1/2" hole 6,100' to 6,822'. Short trip to 6,250', tight and trying to pack off. Work string and clean up hole. RIH to btm, circ hole clean. Short trip to 5,764', pulled tight, worked string and drag dropped off. RIH to btm -hole slick. Directionally dri116,822' to 7,785'. CBU, prep to short trip. February 23, 2008 8,940' MW 9.8 ppg Vis 84 sec Inc160.60 deg CBU 3 times. POH to 6,000', work tight spot 6,305' - 6,250'. RIH to 7,785' - no fill. Directionally drill 8-1/2" hole 7,785' to 8,747'. Short trip to 7,688', wiping minor tight spots. RIH to btm -hole slick. Drill 8,747' to 8,940'. February 24, 2008 10,092' MW 10.0 ppg Vis 66 sec Inc159.80 deg Directionally drill 8-1/2" hole 8,940' to 10,092_'. CBU. POH, L/D 4" DP to change it out with 5" DP (hit hydraulic limit with 4" DP). February 25, 2008 10,092' MW 10.0 ppg Vis 86 sec Incl 60.69 deg Cont. POH and L/D 4" DP. Hole tight at 8,743', 6,300' and 6,000'. L/D HWDP and BHA. Page 3 of 7 Operation Summary: Tofkat 1 February 26, 2008 10,092' MW 10.0 ppg Vis 86 sec Inc160.69 deg L/D MWD and LWD tools. Clear floor of 4" handling tools, P/U 5" tools. Change out saver sub and lower kelly valve on top drive. P/iJ, M/U and SB 37 stands 5" DP in derrick. Test BOPE. February 27, 2008 10,092' MW 10.1 ppg Vis 100 sec Inc160.69 deg .Finish testing BOPE. M/U BHA and test. RIH, picking up singles off rack. Circ at shoe while servicing/repairing rig. RIH, work through tight spot at 4,080'. RIH, work on tight spot at 6,000'. February 28, 2008 10,603' MW 10.4 ppg Vis 80 sec Inc159.90 deg Continue RIH, picking up joints of 5" DP off the rack. Wash and ream as necessary when cuttings beds pile up in front of bit. Directionally drill 8-1/2" hole 10,092' to 10,603'. February 29, 2008 10,603' MW 10.6 ppg Vis 80 sec Inc159.90 deg Directionally drill 8-1/2" hole 10,603' to 11,175'. CBU, make 11 stand wiper trip. Hole in good condition. Drill and slide 11,175' to 11,275'. Change out 2 piston rubbers on #2 mud pump. Directionally drill 11,275' to 11,842'. March 1, 2008 12,794' MW 10.6 ppg Vis 147 sec Inc159.24 deg Directionally dri118-1/2" hole 11,842' to 12,050'. CBU, make 10 stand wiper trip. Hole in good condition. Drill and slide 12,050' to 12,698'. Clean suction screens on both mud pumps and replace 2 discharge valves. Drill 12,698' to 12,794' -too much pump noise to get downhole signal. Change swab in #2 mud pump, change out pulsation dampener. March 2, 2008 13,174' MW 10.6 ppg Vis 147 sec Inc158.17 deg Circ and work pipe while working on mud pump pulsation dampener. Make MAD pass / 12,698' to 12,793'. Control drill 8-1/2" hole 12,794' to 13,174TD. Pump 20-bbl weighted sweep, make 20-stand wiper trip -hole in good condition. C&C well, POH for logs. March 3, 2008 13,174' MW 10.7 ppg Vis 122 sec Inc158.17 deg Finish POH. L/D BHA, R/U wireline for logging. P/LT DSI tool and discover short. Trouble shoot tool and decide to change out for a new one. Change out logging tool and RIH. Page 4 of 7 Operation Summary: Tofkat 1 March 4, 2008 13,174' MW 10.7 ppg Vis 124 sec Inc158.17 deg Continue RIH w/ DSI on wireline, would not ~o past 4,040'. POH and L/D logging tool. Test BOPE. M/iJ DSI and CSI logging tools on DP and RIH. At 3,500' insert side entry sub and pump down wet connect. Check tool communication - OK. Clamp off wireline and RIH w/ logging tools to 3,683'. March 5, 2008 13,174' MW 10.7 ppg Vis 124 sec Inc158.17 deg RIH to 7,000', latch up DSI. Log DSI up to csg shoe. RIH to 7,074', log up w/ LSAT, taking check shots at 12 points along wellpath.. March 6, 2008 13,174' MW 10.5 ppg Vis 124 sec Inc158.17 deg Finish logging up w/ CSAT. Unlatch, R/D side entry sub. RIH to 6,800', install side entry sub and pump down wet connect. Log DSI down 6,883' to 10,390'. Repeat section 10,390' to 10,147'. Log CSAT coming up from 10,374' taking checkshots along wellpath. March 7, 2008 13,174' MW 10.7 ppg Vis 124 sec Incl 58.17 deg Continue to log up w/ LSAT. Pull side entry sub to surface, pull WL, pull side entry sub from drill string. RIH w/ DP and logging tools to 9,900'. Install side entry sub and pump down WL wet connect to logging tools. Log down w/ DSI 9,950' to 13,050'. Log back up w/DSI 13,050' to 9,950'. RIH for CSAT log. March 8, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg RIH to 13,050' and log up w/ CSAT, taking checkshots along wellbore path. POH to side entry sub, unlatch and POH WL, remove side entry sub. RIH w/ DP and logging tools to 12,058'. C&C mud. POH into casing shoe. Slip and cut drilling line. March 9, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg POH, L/D logging tools. Clear floor, M/IJ MDAT logging tools on DP and RIH to 10,187'. R/U side entry sub and pump wet connect on WL. Log down with MDAT, taking pressures and samples, 10,187' to 11,003'. March 10, 2008 13,174' MW 10.7 ppg Vis 155 sec Incl 58.17 deg Continue running MDAT log on DP. Make pressure and sample sets between 11,017' and 11,943'. Unlatch WL and POH to make additional, shallower sets. Page 5 of 7 Operation Summary: Toflcat 1 March 11, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg POH to 5,909'. R/U WL, pump wet connect and latch MDT tools. Conduct MDT pressure and sample sets between 6,125' and 6,298'. March 12, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg Finish MDT sampling, POH to side entry sub. Unlatch and POH w/ WL, remove side entry sub f/ string. L/D logging tools, R/D and release all WL equip. Test BOPE. P/U 2-7/8" tubing cementing stinger on DP and RIH. March 13, 2008 13,174' MW 10.8 ppg Vis 221 sec Inc158.17 deg CBU at 6,146', continue in hole to 12,350' Pump 25 bbl viscous pill to 12,050'. POH to 12,050'. R/IJ cementers. Mix and pump 15 bbls spacer + 82.1 bbls cement. displace w/ 178 bbls OBM. POH to 11,100' and clear DP. Mix and pump 15 bbls spacer + 82.1 bbls -cement followed by 15 bbls spacer. Displace w/ 160 bbls OBM. POH 11 stands drop pipe wiper and CBU. POH. ~ ~CC~~: ~ (`> ~-i_ March 14, 2008 9,950' MW 10.8 ppg Vis 275 sec Incl 58.17 deg POH wet to stinger, L/D same. M/U 8-1/2" clean-out assy, RIH. Tai hard cmt at 9,950', wt-tested to 20,000 lbs. Witnessed and approved by AOGCC rep.. Circ to clean and balance mud. POH. M/iJ cementing stinger, RIH to place 2n balanced cmt plug. March 15, 2008 9,950' MW 10.9 ppg Vis 265 sec Inc158.17 deg Finish RIH w/ stinger. Spot hi-vis pi116,660' to 6,360'. Pump 15 bbl spacer followed by_ 45.6 bbls cement followed by 5 bbls spacer. POH to 5,385' and circ DP and stinger_ clear. POH. P/U clean-out assy, RIH. Kelly up at 5,500' and RIH looking for TOC at 6,860'. Not found. Pull up to WOC. March 16, 2008 9,950' MW 10.8 ppg Vis 275 sec Inc158.17 deg Wash down looking for cmt plug -none found. C&C hole at 6,550', green cmt at bottoms up. POH, M/iJ cementing stinger, RIH to 6,660'. Spot 15 bbl viscous pill, POH to 6,360'. Test lines then pump 13 bbls spacer followed 51.6 bbls cmt followed by 5 bbls spacer, displaced w/ 84 bbls mud. Pull 10 stds and circ out. March 17, 2008 6,153' MW 10.7 ppg Vis 58 sec Inc158.17 deg POH. L/D cmt stinger, M/U clean-out BHA, service rig, RIH. Look for cement at calculated top of 5,512'. Wash to 5 791' indications of soft cement. CBU, WOC 4 hrs. Wash down to hard cement at 6,15,x.'. C&C, POH. Page 6 of 7 Operation Summary: Tofkat 1 • • March 18, 2008 3,740' MW 10.1 ppg Vis 154 sec Inc158.17 deg POH w/ cleanout assy, P/iJ and RIH w/ cmtg stinger on DP to 6,146'. Test lines and bumb 15 bbls spacer followed by 35 bbls 15.8 pU~ cement followed by 5 bbls spacer. POH 10 stds, circ out. POH to 4,718', spot 25 bbl viscous mud pill 4,718' to 4,400'. POH to 4,400', test lines and pump 15 bbls spacer followed by 53.2 bbls 17 ppg cement followed by 5 bbls spacer. CIP_at 2200 hrs. P__OH to 3,460', circ out and POH. Release rig to Tofkat #lA. FINAL REPORT. ~~ y~ -z- ~~~,1_~~ ~- ~~`~ Page 7 of 7 Operation Summary: Tofkat 1 Brooks Range Petroleum Corporation „~ ~ ,~ ... Sch~umherger i orKat -i ~ u 219.54 257.83 299.53 345.48 395.52 Report Date: March 3, 2008 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: Brooks Range Petroleum Vertical Section Azimuth: 248.420° Field: North Slope Brooks Range Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: Tofkat 1 /Tofkat 1 ND Reference Datum: Rotary Table • Well: Tofkat 1 ND Reference Elevation: 52.70 ft relative to MSL Borehole: Tofkat 1 Sea Bed 1 Ground Level Elevation: 19.80 ft relative to MSL . UWIIAPIfI: 501032056700 Magnetic Declination: 22.305° Survey Name 1 Date: Tofkat 1 I February 11, 2008 Total Field Strength: 57574.075 nT Tort 1 AHD 1 DDI 1 ERD ratio: 143.885° 19969.61 ft / 6.389 11.293 Magnetic Dip: 80.635° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 11, 2008 Location LaULong: N 7013 48.186, W 150 47 20.709 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5934319.600 ftUS, E 402238.800 ftUS North Reference: True NoRh Grid Convergence Angle: -0.74258124° Total Corr Mag North •> True North: +22.305° Grid Scale Factor: 0.99991086 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS K I t U .UU U.UU U.UU Inc only 202 .59 0.14 239.11 Inc Only 295 .23 0.37 239.11 MWD 388 .31 1.42 239.11 480 .36 2.52 243.75 571 .40 4.99 248.35 663 .14 6.42 251.73 754 .81 7.22 250.23 848 .21 9.01 244.10 939 .56 10.60 248.15 • 1036 .82 12.60 247.45 1133 .01 14.30 247.43 1228 .76 15.35 246.31 1325 .63 17.89 249.11 1421 .43 20.07 249.67 1516 .67 22. 31 249.18 1613 .08 24. 50 249. 07 1709 .29 26. 87 248. 33 1805 .79 30. 01 248. 11 1902 .10 32. 60 248. 76 1999 .32 35. 12 250. 20 2095 .66 37. 92 249. 95 2191 .36 40. 17 249. 44 SurveyEditor Ver SP 2.1 Bld(doc40x_100 ) -5L./U U.UU V.UV U.UU U.VU U.VV 149.89 202.59 0.24 0.25 0.25 -0.13 242.53 295.23 0.65 0.66 0.66 -0.34 335.60 388.30 2.09 2.11 2.11 -1.09 427.59 480.29 5.23 5.28 5.27 -2.57 518.43 571.13 11.18 609.71 662.41 20.29 700.73 753.43 31.17 793.20 845.90 44.33 883.21 935.91 59.86 978.48 1031.18 1072.03 1124.73 1164.59- 1217.29 1257.40 1310.10 1347.99 1400.69 79.42 101.79 126.28 153.97 185.12 1436.79 1489.49 1525.26 1577.96 1611.96 1664.66 1696.80 1749.50 1779.08 1831.78 1859.81 1912.51 1937.22 1989.92 2011.54 2064.24 rceport 11.24 20.35 31.24 44.41 59.96 79.51 101.89 126.39 154.08 185.24 219.66 257.96 299.65 345.61 395.64 11.22 20.30 31.17 44.33 59.87 79.43 101.80 126.30 153.99 185.14 219.55 257.83 299.53 345.48 395.52 -4.91 -7.99 -11.55 -16.73 -22.98 -30.38 -38.96 -48.59 -59.05 -70.01 -82.11 -95.76 -110.92 -127.97 -146.35 V.VU -0.21 -0.57 -1.81 -4.61 -10.08 -18.66 -28.95 -41.05 -55.29 -73.39 -94.05 -116.58 -142.22 -171.39 -203.61 -239.39 -278.24 -320.90 -367.44 449.67 449.80 449.67 -165.32 -418.17 506.97 507.13 506.97 -184.86 -472.07 567.23 567.41 567.24 -205.78 -528.60 Tofkat 1\Tofkat 1\Tofkat 1\Tofkat 1 U.VU •OyJ431y.0U ffULLJO.OU IV /U IJ •t0.100 VV IJV 'f! GV.IV~ 0.07 5934319.48 402238.59 N 70 13 48.185 W 150 47 20.715 0.25 5934319.27 402238.23 N 70 13 48.183 W 150 47 20.726 1.13 5934318.54 402236.97 N 70 13 48.175 W 150 47 20.762 1.21 5934317.09 402234.16 N 70 13 48.161 W 150 47 20.843 2.73 5934314.82 402228.65 N 70 13 48.138 W 150 47 21.002 1.60 5934311.85 402220.04 N 70 13 48.107 W 150 47 21.252 0.89 5934308.43 402209.70 N 70 13 48.072 W 150 47 21.550 2.13 5934303.41 402197.54 N 70 13 48.021 W 150 47 21.902 1.90 5934297.34 402183.22 N 70 13 47.960 W 150 47 22.316 2.06 5934290.18 402165.03 N 70 13 47.887 W 150 47 22.842 1.77 5934281.86 402144.26 N 70 13 47.803 W 150 47 23.442 1.14 5934272.53 402121.61 N 70 13 47.708 W 150 47 24.096 2.75 5934262.40 402095.84 N 70 13 47.605 W 150 47 24.841 2.28 5934251.82 402066.54 N 70 13 47.497 W 150 47 25.689 2.36 5934240.14 402034.16 N 70 13 47.378 W 150 47 26.625 2.27 5934226.96 401998.21 N 70 13 47.244 W 150 47 27.664 2.49 5934212.31 401959.18 N 70 13 47.095 W 150 47 28.793 3.26 5934195.81 401916.29 N 70 13 46.927 W 150 47 30.033 2.71 5934178.03 401869.52 N 70 13 46.747 W 150 47 31.385 2.72 5934159.73 401818.56 N 70 13 46.560 W 150 47 32.859 2.91 5934140.89 401764.42 N 70 13 46.368 W 150 47 34.424 2.37 5934120.70 401707.63 N 70 13 46.162 W 150 47 36.067 Generated 5/1/2008 10:18 AM Page 1 of 4 Comments Measured Inclination Azimuth Sub•Sea ND 7Vp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS L'Ltf/.:it5 4L.~JU 2383.24 45.30 2479.63 47.25 2575.36 49.80 2672.52 52.47 2769.60 55.53 2865.78 58.37 Z4tf.Z/ ZUtfJ.4l L13b.l1 b3V.r5y b3l.V/ b3V.yV -LL25./b -Oi3l.`J/ 247.47 2152.25 2204.95 697.59 697.78 697.60 -253.90 -649.75 247.29 2218.87 2271.57 767.24 767.43 248.45 2282.27 2334.97 838.95 839.15 248.45 2343.23 2395.93 914.60 914.79 248.31 2400.28 2452.98 993.13 993.32 248.63 2452.73 2505.43 1073.73 1073.93 2962 .06 58. 24 249. 48 2503 .32 2556.02 3056 .42 58. 98 249. 61 2552 .47 2605.17 3152 .53 59. 54 248. 63 2601 .59 2654.29 • 3248 3345 .84 .15 60. 58. 04 82 248. 247. 31 57 2650 2699 .05 .04 2702.75 2751.74 3441 .41 59. 74 248. 10 2748 .21 2800.91 3539 .10 60. 30 247. 14 2797 .03 2849.73 3634 .56 60. 14 247. 78 2844 .44 2897.14 3730 .23 60. 17 247. 67 2892 .05 2944.75 TD (Csg @ 3897) 3824 .52 60. 69 248. 10 2938 .58 2991.28 3995 .43 59. 70 247. 80 3023 .53 3076.23 4057 .76 59. 03 248. 61 3055 .29 3107.99 4153 .21 59. 21 249. 22 3104 .28 3156.98 4250 .95 59. 04 248. 05 3154 .44 3207.14 4346 .67 58. 54 247 .91 3204 .04 3256.74 4441 .19 59. 18 248 .51 3252 .92 3305.62 4536 .95 59. 35 248. 83 3301 .86 3354.56 4634 .01 59. 70 248. 83 3351 .08 3403.78 4729 .93 59. 07 248 .72 3399 .93 3452.63 4827 .37 60. 82 248 .98 3448 .73 3501.43 4923 .93 60. 70 249 .78 3495 .90 3548.60 5020 .27 60. 00 249 .50 3543 .56 3596.26 5116 .69 59. 33 249 .49 3592 .25 3644.95 5211 .84 60. 19 249 .19 3640 .17 3692.87 5308 .44 59. 79 249 .45 3688 .49 3741.19 5404 .89 59. 24 249 .79 3737 .42 3790.12 5500 .36 59. 88 248 .42 3785 .79 3838.49 5596 .11 59. 48 248 .36 3834 .12 3886.82 5694 .02 60. 23 248 .19 3883 .29 3935.99 5790 .41 59. 77 247 .99 3931 .49 3984.19 5886 .69 59. 48 248. 39 3980 .17 4032.87 5983 .40 59. 90 248. 23 4028 .98 4081.68 6077 .42 59. 27 249. 35 4076 .58 4129.28 6174 .03 60. 10 249. 31 4125 .34 4178.04 1155.65 1236.18 1318.78 1402.01 1484.93 1567.67 1652.28 1735.13 1818.10 1900.11 2048.40 2102.03 2183.95 2267.83 2349.70 2430.59 2512.90 2596.55 2679.10 2763.43 2847.68 2931.38 3014.59 3096.78 3180.42 3263.51 3345.82 3428.47 3513.14 3596.61 1155.85 1236.40 1319.01 1402.24 1485.16 1567.91 1652.53 1735.38 1818.36 1900.37 2048.67 2102.30 2184.22 2268.11 2349.98 767.24 -280.69 -714.05 838.95 -307.70 -780.49 914.60 -335.48 -850.85 993.13 -364.42 -923.85 1073.74 -394.00 -998.84 1155.65 -423.28 -1075.34 1236.19 -451.43 -1150.81 1318.79 -480.87 -1227.99 1402.02 -511.42 -1305.41 1484.93 -542.56 -1382.27 1567.68 -573.78 -1458.90 1652.28 -606.00 -1537.15 1735.13 -637.76 -1613.67 1818.10 -669.21 -1690.46 1900.11 -700.08 -1766.43 2048.40 -755.76 -1903.89 2102.03 -775.67 -1953.68 2183.95 -805.14 -2030.12 2267.83 -835.70 -2108.24 2349.70 -866.39 -2184.13 2430.88 2430.60 2513.19 2512.90 2596.84 2596.55 2679.39 2679.10 2763.72 2763.43 2847.98 2847.68 2931.70 2931.38 3014.92 3014.59 3097.12 3096.78 3180.77 3180.42 3263.89 3263.53 3346.20 3345.83 3428.85 3428.48 3513.52 3513.15 3596.99 3596.62 -896.42 -926.36 -956.57 -986.46 -1016.88 -1046.56 -1075.68 -1104.83 -1133.84 -1163.38 -1192.32 -1221.68 -1252.12 -1283.46 -1314.61 -2259.25 -2335.93 -2413.93 -2490.88 -2569.54 -2648.39 -2726.89 -2804.83 -2881.75 -2960.01 -3037.92 -3114.81 -3191.66 -3270.31 -3347.76 3679.67 3680.06 3679.68 -1345.47 -3424.88 3763.16 3763.55 3763.17 -1376.33 -3502.45 3844.24 3844.63 3844.25 -1405.66 -3578.04 3927.63 3928.03 3927.64 -1435.10 -3656.07 L.`9b .7`J34U~8.UV 4V 104/.y/ IV / V IJ 4.7.yJ0 VV IJV Y! J/.l ~G 2.57 5934074.16 401585.87 N 70 13 45.689 W 150 47 39.587 2.03 5934048.21 401521.24 N 70 13 45.425 W 150 47 41.454 2.81 5934022.07 401454.46 N 70 13 45.159 W 150 47 43.385 2.75 5933995.20 401383.76 N 70 13 44.886 W 150 47 45.429 3.15 5933967.22 401310.39 N 70 13 44.601 W 150 47 47.550 2.97 5933938.62 401235.03 N 70 13 44.310 W 150 47 49.728 0.76 5933910.33 401158.16 N 70 13 44.022 W 150 47 51.951 0.79 5933883.16 401082.34 N 70 13 43.745 W 150 47 54.143 1.05 5933854.72 401004.79 N 70 13 43.456 W 150 47 56.385 0.59 5933825.19 400926.99 N 70 13 43.155 W 150 47 58.634 1.43 5933795.05 400849.75 N 70 13 42.849 W 150 48 0.867 1.07 5933764.83 400772.72 N 70 13 42.542 W 150 48 3.093 1.03 5933733.63 400694.07 N 70 13 42.224 W 150 48 5.366 0.61 5933702.87 400617.15 N 70 13 41.912 W 150 48 7.589 0.10 5933672.41 400539.97 N 70 13 41.602 W 150 48 9.819 0.68 5933642.53 400463.60 N 70 13 41.299 W 150 48 12.026 0.60 5933588.65 400325.45 N 70 13 40.751 W 150 48 16.019 1.55 5933569.39 400275.41 N 70 13 40.555 W 150 48 17.466 0.58 5933540.91 400198.60 N 70 13 40.265 W 150 48 19.686 1.04 5933511.37 400120.10 N 70 13 39.964 W 150 48 21.955 0.54 5933481.66 400043.82 N 70 13 39.662 W 150 48 24.160 0.87 5933452.61 399968.33 N 70 13 39.366 W 150 48 26.342 0.34 5933423.67 399891.28 N 70 13 39.072 W 150 48 28.569 0.36 5933394.48 399812.90 N 70 13 38.774 W 150 48 30.835 0.66 5933365.60 399735.57 N 70 13 38.480 W 150 48 33.070 1.81 5933336.19 399656.54 N 70 13 38.181 W 150 48 35.354 0.73 5933307.55 399577.31 N 70 13 37.889 W 150 48 37.645 0.77 5933279.44 399498.45 N 70 13 37.602 W 150 48 39.925 0.69 5933251.31 399420.14. N 70 13 37.315 W 150 48 42.189 0.94 5933223.31 399342.86 N 70 13 37.029 W 150 48 44.423 0.48 5933194.78 399264.23 N 70 13 36.738 W 150 48 46.696 0.65 5933166.85 399185.96 N 70 13 36.453 W 150 48 48.959 1.41 5933138.50 399108.70 N 70 13 36.164 W 150 48 51.192 0.42 5933109.06 399031.48 N 70 13 35.865 W 150 48 53.424 0.78 5933078.74 398952.43 N 70 13 35.556 W 150 48 55.709 0.51 5933048.60 398874.59 N 70 13 35.249 W 150 48 57.958 0.47 5933018.75 398797.09 N 70 13 34.946 W 150 49 0.198 0.46 5932988.90 398719.12 N 70 13 34.642 W 150 49 2.451 1.23 5932960.55 398643.17 N 70 13 34.353 W 150 49 4.646 0.86 5932932.13 398564.77 N 70 13 34.063 W 150 49 6.912 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1\Tofkat 1 Generated 5/1/2008 10:18 AM Page 2 of 4 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS i L~ OL/V. .78 .7`J. O/ LYB.l1 YI/J. /J YLLO. Yy YUII. IY YVII.JJ YV 11. IV -IYVJ.VL -Jl JY. VV 6366. 47 59. 16 248. 68 4222. 58 4275. 28 4093. 69 4094. 09 4093. 71 -1495. 01 -3810. 95 6463. 28 60. 36 248. 24 4271. 33 4324. 03 4177. 32 4177. 73 4177. 34 -1525. 72 -3888. 75 6559. 40 59. 92 248. 98 4319. 19 4371. 89 4260. 68 4261. 09 4260. 70 -1556. 12 -3966. 36 6655. 88 59. 25 248. 71 4368. 03 4420. 73 4343. 88 4344. 29 4343. 90 -1586. 15 -4043. 96 6751. 36 60. 33 248. 54 4416. 08 4468. 78 4426. 39 4426 .80 4426. 41 -1616. 22 -4120. 79 6848. 10 60. 27 249. 16 4464. 01 4516. 71 4510. 42 4510 .83 4510. 44 -1646. 54 -4199. 16 6943. 79 59. 64 249. 40 4511. 92 4564. 62 4593. 24 4593 .66 4593. 27 -1675. 85 -4276. 64 7039. 79 59. 00 249. 15 4560. 90 4613. 60 4675. 80 4676 .23 4675. 82 -1705. 07 -4353. 86 7136. 36 59. 51 247 .94 4610. 27 4662. 97 4758. 79 4759 .22 4758. 82 -1735. 42 -4431. 10 7231. 82 60. 31 247 .11 4658. 13 4710. 83 4841. 38 4841 .82 4841. 40 -1767. 00 -4507. 42 7329. 55 59. 81 247 .39 4706. 90 4759. 60 4926. 04 4926 .51 4926. 06 -1799. 75 -4585 .52 7425. 07 59. 08 247 .40 4755. 46 4808. 16 5008 .29 5008 .76 5008. 30 -1831. 37 -4661 .46 7522. 36 59. 90 246 .91 4804. 86 4857. 56 5092 .09 5092 .58 5092. 09 -1863. 91 -4738 .70 7618. 29 60. 30 247 .33 4852. 68 4905. 38 5175 .22 5175 .74 5175. 23 -1896. 24 -4815 .32 7714. 80 59. 73 247 .64 4900. 91 4953. 61 5258 .81 5259 .33 5258. 81 -1928. 25 -4892 .54 7810. 92 59. 01 247 .72 4949. 88 5002. 58 5341 .51 5342 .04 5341. 51 -1959. 67 -4969 .05 7907. 08 59. 97 247 .36 4998. 70 5051. 40 5424 .34 5424 .89 5424. 34 -1991. 32 -5045 .61 8003. 28 59. 77 247 .17 5046. 99 5099. 69 5507 .53 5508 .09 5507. 53 -2023. 47 -5122 .35 8099. 62 60. 14 247 .48 5095. 22 5147. 92 5590 .91 5591 .48 5590. 91 -2055. 62 -5199 .30 8195. 17 59. 40 247 .35 5143. 33 5196. 03 5673 .45 5674 .04 5673. 45 -2087. 33 -5275 .52 8292. 67 58. 67 247 .14 5193. 50 5246. 20 5757 .04 5757 .64 5757. 04 -2119. 66 -5352 .62 8387. 06 59. 60 246 .41 5241. 92 5294. 62 5838 .02 5838 .66 5838. 03 -2151 .61 -5427 .07 8485. 59 60. 14 247 .86 5291. 38 5344. 08 5923 .22 5923 .88 5923. 22 -2184 .72 -5505 .59 8581. 24 59. 43 247 .38 5339. 52 5392. 22 6005 .86 6006 .53 6005. 87 -2216. 19 -5582 .02 8676. 89 60. 40 248 .12 5387. 46 5440. 16 6088 .62 6089 .30 6088. 63 -2247 .53 -5658 .62 8773. 00 60 .06 248 .26 5435. 18 5487. 88 6172 .04 6172 .72 6172. 05 -2278 .52 -5736 .07 8869. 40 59 .30 248 .19 5483. 85 5536. 55 6255 .26 6255 .94 6255. 26 -2309 .39 -5813 .35 8962. 43 60 .06 249 .20 5530. 81 5583. 51 6335 .56 6336 .24 6335. 57 -2338 .57 -5888 .17 9059. 18 59 .46 249 .41 5579. 54 5632. 24 6419 .13 6419 .83 6419. 14 -2368 .10 -5966 .36 9155. 04 59 .94 248 .89 5627. 90 5680. 60 6501 .89 6502 .59 6501. 89 -2397 .56 -6043 .70 9252. 49 59 .16 249 .34 5677. 29 5729. 99 6585 .89 6586 .60 6585. 90 -2427 .51 -6122 .19 9348. 38 59 .34 249 .09 5726. 32 5779. 02 6668 .29 6669 .01 6668. 30 -2456 .76 -6199 .23 9444. 85 60 .62 249 .56 5774. 58 5827. 28 6751 .81 6752 .53 6751. 81 -2486 .24 -6277 .38 9539. 46 60 .12 249 .30 5821. 36 5874. 06 6834 .03 6834 .77 6834. 04 -2515 .14 -6354 .38 9635. 58 59 .24 249 .19 5869. 88 5922. 58 6917 .00 6917 .74 6917. 00 -2544 .54 -6431 .97 9731. 96 60 .55 249 .27 5918. 22 5970. 92 7000 .37 7001 .12 7000. 37 -2574 .11 -6509 .92 9828. 65 60 .10 249 .30 5966. 09 6018. 79 7084 .37 7085 .13 7084. 37 -2603 .82 -6588 .50 9925. 09 60 .60 249 .71 6013. 80 6066. 50 7168 .16 7168 .94 7168. 16 -2633 .17 -6667 .01 10021. 35 60 .13 250 .03 6061. 40 6114. 10 7251 .80 7252 .61 7251. 81 -2661 .96 -6745 .57 10106. 62 59 .96 250 .98 6103. 97 6156. 67 7325 .63 7326 .49 7325. 64 -2686 .62 -6815 .21 V.I V VJVG~V J.GJ JVVTVV.TG ~~ ~ v ~V VV.~vv •• ivv T.i r. ~ ~ 0.53 5932874.24 398409.14 N 70 13 33.473 W 150 49 11.411 1.30 5932844.54 398330.96 N 70 13 33.171 W 150 49 13.670 0.81 5932815.15 398252.97 N 70 13 32.871 W 150 49 15.924 0.74 5932786.13 398175.00 N 70 13 32.576 W 150 49 18.178 1.14 5932757.06 398097.78 N 70 13 32.279 W 150 49 20.409 0.56 5932727.76 398019.03 N 70 13 31.981 W 150 49 22.685 0.69 5932699.47 397941.19 N 70 13 31.692 W 150 49 24.935 0.70 5932671.25 397863.61 N 70 13 31.404 W 150 49 27.177 1.20 5932641.90 397785.99 N 70 13 31.105 W 150 49 29.421 1.13 5932611.32 397709.27 N 70 13 30.794 W 150 49 31.637 0.57 5932579.59 397630.76 N 70 13 30.472 W 150 49 33.905 0.76 5932548.96 397554.43 N 70 13 30.160 W 150 49 36.110 0.95 5932517.42 397476.78 N 70 13 29.840 W 150 49 38.353 0.56 5932486.09 397399.75 N 70 13 29.521 W 150 49 40.578 0.65 5932455.09 397322.13 N 70 13 29.206 W 150 49 42.820 0.75 5932424.67 397245.23 N 70 13 28.897 W 150 49 45.042 1.05 5932394.02 397168.27 N 70 13 28.585 W 150 49 47.265 0.27 5932362.86 397091.13 N 70 13 28.268 W 150 49 49.494 0.47 5932331.72 397013.78 N 70 13 27.951 W 150 49 51.728 0.78 5932301.01 396937.15 N 70 13 27.639 W 150 49 53.942 0.77 5932269.67 396859.65 N 70 13 27.320 W 150 49 56.180 1.19 5932238.69 396784.80 N 70 13 27.006 W 150 49 58.342 1.39 5932206.61 396705.86 N 70 13 26.680 W 150 50 0.622 0.86 5932176.13 396629.04 N 70 13 26.369 W 150 50 2.841 1.22 5932145.80 396552.05 N 70 13 26.061 W 150 50 5.066 0.38 5932115.81 396474.20 N 70 13 25.755 W 150 50 7.315 0.79 5932085.95 396396.54 N 70 13 25.451 W 150 50 9.558 1.24 5932057.75 396321.36 N 70 13 25.164 W 150 50 11.731 0.65 5932029.23 396242.80 N 70 13 24.873 W 150 50 14.001 0.69 5932000.78 396165.09 N 70 13 24.582 W 150 50 16.247 0.89 5931971.85 396086.22 N 70 13 24.287 W 150 50 18.526 0.29 5931943.61 396008.81 N 70 13 23.999 W 150 50 20.763 1.39 5931915.14 395930.30 N 70 13 23.708 W 150 50 23.032 0.58 5931887.25 395852.94 N 70 13 23.423 W 150 50 25.267 0.92 5931858.86 395774.99 N 70 13 23.133 W 150 50 27.520 1.36 5931830.31 395696.66 N 70 13 22.842 W 150 50 29.784 0.47 5931801.61 395617.71 N 70 13 22.549 W 150 50 32.065 0.64 5931773.29 395538.84 N 70 13 22.260 W 150 50 34.345 0.57 5931745.52 395459.92 N 70 13 21.976 W 150 50 36.625 0.99 5931721.77 395389.97 N 70 13 21.733 W 150 50 38.647 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1\Tofkat 1 Generated 5/1/2008 10:18 AM Page 3 of 4 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS 10152.19 59.64 249. 43 6126 .90 6179. 60 7365. 00 7365. 87 7365 .00 -2699. 95 -6852. 27 3.02 5931708. 92 10248.39 59.12 249. 49 6175 .90 6228. 60 7447. 77 7448. 66 7447 .78 -2729. 00 -6929. 79 0.54 5931680. 88 10344.55 60.39 248. 70 6224 .33 6277. 03 7530. 83 7531 .73 7530 .84 -2758. 64 -7007. 39 1.50 5931652. 25 10439.48 60.24 249. 38 6271 .34 6324. 04 7613. 30 7614. 20 7613 .31 -2788. 15 -7084. 40 0.64 5931623. 75 10533.74 60.10 248. 04 6318 .23 6370. 93 7695. 07 7695. 97 7695 .08 -2817. 83 -7160. 59 1.24 5931595. 05 10629. 57 59. 90 249 .41 6366. 15 6418. 85 7778. 05 7778 .96 7778. 06 -2847. 95 -7237. 92 1.26 5931565. 95 10723. 91 60. 07 248 .60 6413. 34 6466. 04 7859. 74 7860 .65 7859. 75 -2877. 21 -7314. 18 0.76 5931537. 67 10820. 09 59. 67 247 .98 6461. 62 6514. 32 7942. 92 7943 .83 7942. 93 -2907. 98 -7391. 47 0.70 5931507. 91 10912. 53 59. 24 248 .06 6508. 60 6561. 30 8022. 53 8023 .44 8022. 54 -2937. 78 -7465. 29 0.47 5931479. 07 11008. 32 60. 31 246 .52 6556. 82 6609. 52 8105. 28 8106 .21 8105. 29 -2969. 74 -7541. 64 1.78 5931448. 11 11104. 48 60. 73 247 .61 6604. 15 6656. 85 8188. 96 8189 .92 8188. 97 -3002. 36 -7618. 73 1.08 5931416. 50 11199. 13 59. 50 247 .60 6651. 31 6704. 01 8271. 02 8271 .98 8271. 02 -3033. 62 -7694 .60 1.30 5931386. 22 11294. 99 59. 27 248 .04 6700. 12 6752. 82 8353. 51 8354 .48 8353. 51 -3064. 77 -7771 .00 0.46 5931356. 07 11391. 14 59. 19 248 .30 6749. 31 6802. 01 8436. 12 8437 .09 8436. 13 -3095. 49 -7847 .69 0.25 5931326. 35 11485. 39 58. 85 247 .93 6797. 83 6850. 53 8516. 93 8517 .90 8516. 93 -3125. 61 -7922 .67 0.49 5931297. 21 11580. 67 58. 45 248 .40 6847. 40 6900. 10 8598. 29 8599 .27 8598. 30 -3155. 87 -7998 .20 0.59 5931267. 93 11676. 58 59. 88 248 .06 6896. 56 6949. 26 8680. 64 8681 .62 8680. 65 -3186. 42 -8074 .68 1.52 5931238. 38 11771. 60 59. 68 247 .87 6944. 38 6997. 08 8762. 75 8763 .72 8762. 75 -3217. 22 -8150 .78 0.27 5931208. 57 11866. 68 58. 92 248 .80 6992. 93 7045. 63 8844. 50 8845 .48 8844. 50 -3247. 40 -8226 .76 1.16 5931179. 37 11962. 96 58. 39 248 .66 7043. 01 7095. 71 8926. 73 8927 .71 8926. 73 -3277. 23 -8303 .39 0.56 5931150. 54 12057. 60 59. 66 247 .70 7091. 72 7144. 42 9007. 87 9008 .85 9007. 87 -3307. 40 -8378 .71 1.60 5931121. 36 12152. 30 60. 70 247 .58 7138. 81 7191. 51 9090. 02 9091 .01 9090. 02 -3338. 65 -8454 .70 1.10 5931091. 10 12248. 26 60. 20 247 .78 7186. 13 7238. 83 9173. 49 9174 .49 9173. 49 -3370. 36 -8531 .92 0.55 5931060. 40 12343. 95 59. 70 247 .65 7234. 05 7286. 75 9256. 31 9257 .31 9256. 31 -3401. 77 -8608 .56 0.54 5931029. 99 12438. 90 59. 13 248 .87 7282. 37 7335. 07 9338. 05 9339 .05 9338. 05 -3432. 04 -8684 .48 1.26 5931000. 70 12534. 54 60. 13 247 .45 7330. 72 7383. 42 9420. 56 9421 .57 9420. 56 -3462. 74 -8761 .07 1.65 5930971. 00 12628. 10 59. 94 248 .14 7377. 45 7430. 15 9501. 61 9502 .62 9501. 61 -3493. 38 -8836 .11 0.67 5930941. 34 12723. 49 59. 24 248 .03 7425. 74 7478. 44 9583. 87 9584 .89 9583. 87 -3524. 08 -8912 .43 0.74 5930911. 63 13008. 76 58. 50 248 .90 7573. 22 7625. 92 9828. 06 9829 .07 9828. 06 -3613. 72 -9139 .57 0.37 5930824. 95 L 'urvey 13104. 07 58. 17 248 .48 7623. 25 7675. 95 9909. 18 9910 .19 9909. 18 -3643. 20 -9215 .15 0.51 5930796. 46 TD (Projected) ~ 13174. 00 58. 17 248 .48 7660. 13 7712. 83 9968. 59 9969 .61 9968. 59 -3664. 99 -9270 .42 0.00 ~ 5930775. 38 Legal Description: Northin~ l(Y) fftUSl Eastinsl (X) fftUSl Surface : 661 FSL 1808 FEL S11 T1ON R5E UM 5934319.60 402238.80 BHL : 2271 FS L 522 FEL S16 T1ON R5E UM 5930775.38 392922.51 395352.75 N 70 13 21.601 W 150 50 39.723 395274.86 N 70 13 21.315 W 150 50 41.974 395196.89 N 70 13 21.023 W 150 50 44.227 395119.51 N 70 13 20.732 W 150 50 46.463 395042.95 N 70 13 20.439 W 150 50 48.675 394965.24 N 70 13 20.142 W 150 50 50.920 394888.61 N 70 13 19.854 W 150 50 53.134 394810.94 N 70 13 19.550 W 150 50 55.378 394736.74 N 70 13 19.257 W 150 50 57.521 394660.00 N 70 13 18.942 W 150 50 59.737 394582.50 N 70 13 18.620 W 150 51 1.975 394506.23 N 70 13 18.312 W 150 51 4.178 394429.45 N 70 13 18.005 W 150 51 6.396 394352.37 N 70 13 17.702 W 150 51 8.622 394277.02 N 70 13 17.405 W 150 51 10.799 394201.11 N 70 13 17.106 W 150 51 12.991 394124.25 N 70 13 16.805 W 150 51 15.211 394047.75 N 70 13 16.501 W 150 51 17.421 393971.40 N 70 13 16.204 W 150 51 19.626 393894.40 N 70 13 15.910 W 150 51 21.851 393818.69 393742.32 393664.70 393587.66 393511.36 393434.39 393358.96 393282.26 393054.00 392978.06 N 70 13 15.612 W 150 51 24.037 N 70 13 15.304 W 150 51 26.243 N 70 13 14.991 W 150 51 28.484 N 70 13 14.681 W 150 51 30.709 N 70 13 14.383 W 150 51 32.913 N 70 13 14.080 W 150 51 35.136 N 70 13 13.778 W 150 51 37.314 N 70 13 13.475 W 150 51 39.530 N 70 13 12.591 W 150 51 46.123 N 70 13 12.300 W 150 51 48.316 392922.51 N 70 13 12.085 W 150 51 49.920 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Tofkat 1\Tofkat 1\Tofkat 1\Tofkat 1 Generated 5/1/2008 10:18 AM Page 4 of 4 r • • Drilling & Measurements 2525 Gambell Street Suite 400 Anchorage AK 99503 Tel (907) 273-1700 Fax (907) 561-8317 Date: 28-Mar-2008 Well Name: Tofkat lA Company: Brooks Range Petroleum Corporation API Number: 50-103-20567-01 AFE Number: 640012 Location: Greater Prudhoe Bay Field: North Slope Brooks Range Rig: Nabors 27E Schlumberger ~~~ ~~~~ ~~ ~i~`kix , _.. Drilling and Measurements Field Support: Operations Manager: Julio Loreto Field Service Manager: Franklin Medina Drilling and Measurements Field Crew: Cell Manager(s): N. Beck SERVICES PROVIDED Services Services Dates Depth Intervals Directional Survey Service 19-Mar-2008 to 26-Mar-2008 3940 ft to 11297 ft PowerPulse* Direction and Inclination 19-Mar-2008 to 26-Mar-2008 3940 ft to 11297 ft VISION* Service 19-Mar-2008 to 26-Mar-2008 3940 ft to 11297 ft OPERATING STATISTICS Total MWD Pumping Time: 84.2 h Total MWD Time Below Rotary: 126.5 h Total MWD depth interval: 7357 ft Total MWD Runs: 2 JOB PERFORMANCE nirectinnal Total LWD Pumping Time: 84.2 h Total LWD Time Below Rotary: 126.5 h Total LWD depth interval: 7357 ft Total LWD Runs: 2 The final MWD survey point was at 11230.77 ft MD with an inclination of 66.67 degrees and an azimuth of 219.94 degrees. A survey was projected straight ahead to TD (11297 ft MD) using an inclination of 66.67 degrees and an azimuth of 219.94 degrees. This resulted in a final bottom hole location of: Measured Depth: True Vertical Depth: Displacement at Azimuth: Formation Evaluation 11297.0 ft 7168.27 ft 7908.57 ft at 228.87 degrees All measurements were recorded in real time and recorded mode. At the conclusion of the LWD run, the tool's memory was downloaded and recorded data generated. The final recorded memory data had good resolution over the logged sections. Once obtained, this data was delivered to the company man at the rig site and delivered to Brooks Range in town. Final data was presented in LAS format and the printed PDS logs, and files were generated using the requested formats. ~~(~~~/~ ~ ~~-f~3 ! ~ ~ ~~ r • • 81/2 inch Intermediate Section RUNOOI This run was the first attempt to drill the open-hole sidetrack. Upon reaching the depth at which the cement plug should have been no cement was found. After running in a bit further, the run was aborted and the assemble was pulled out. PowerPulse* provided direction and inclination measurements. ARC6* provided real-time and recorded mode Gamma Ray and Resistivity data. ADN6* provided real-time and recorded mode Bulk Density and Neutron Porosity data. SonicVISION* provided real-time and recorded mode Slowness data. RUN002 This run was drilled from a sidetrack point of 3940 ft MD to TD at 11297 ft MD. PowerPulse* provided direction and inclination measurements. ARC6* provided real-time and recorded mode Gamma Ray and Resistivity data. ADN6* provided real-time and recorded mode Bulk Density and Neutron Porosity data. SonicVISION* provided real-time and recorded mode Slowness data. Transverse Shock Transverse shocks were monitored in the PowerPulse* tool. Few shocks were seen during the two runs. Neither shocks nor stick-slip had significant effect on the data or drilling tools. Lesson(s) Learned Many of the surface sensor measurements were taken from the rig's EPOCH system through WITS. Innovation(s) 1) Acquiring measurements reading from Rig's EPOCH system worked well and avoided unnecessary rig up of redundant sensors. Schlumberger Oilfield Services -Drilling & Measurements appreciates the opportunity to provide Brooks Range Petroleum Corporation with MWD and LWD services. Sincerely, Nate Beck Cell Manager Schlumberger D&M e Environmental Defense Center (IDC), Get Oil Out, a Planning Association of Santa Barbara negotiated the Th greement remains subject to approval from regal rs.The Santa B aza County Planning Commission was sched to con- sider the reement at an Apr. 21 meeting in Santa M a. If coon officials approve the agreement, then it go before the Califo Lands Commission, the California stal Commis- sion, and the Minerals Management Service. Assuming provals are granted, Plains b eves it could drill a well in the fou quarter, a company spoke an told OGJ. Terms call for tailing production of e sting oil and gas op- erations off Lompoc d Gaviota coast. Pla' s also agreed to donate land for parks. EDC secured what i alls an oil company for zer et project. Plains agreed to c the purchase of hybrid base Linda Krop, EDC spokesw that oil and gas development Pedernales fields end Dec. 31 The agreement followe production from Platfor e Aug. 7, 2006, p. 20). "an unpr edented agreement' from greenh se gas emissions from the ibute .5 million to a local fund for Tofkat-1 awaits evaluation to determine its commerciality. Log analysis confirmed an interval of 10 ft of gross pay and 6 ft of net pay. No oil-water contact was observed, and no production test was attempted. Brooks Range Petroleum Corp., the operator, drilled two sidetrack appraisal wells. Tofkat-1 was suspended for possible re-entry as a future pro- duction well. The well is east of the Colville River (OGJ, Jan. 28, 2008, p. 42). Partners are acquiring 210 sq miles of 3D seismic survey to be analyzed by late 2008 in prepazation for an appraisal drilling pro- gram in the 2009 winter drilling season. The 3D seismic will also be used to evaluate uphole potential in the Brookian formations. Joint venture partners are Brooks Range Petroleum, TG World Energy Inc., Bow Valley Alaska Corp., and Ramshorn Investments Inc. said the agreement stipulates aCl t Tranquillon Ridge and Point ~ it CreA s roposal to expand its existing Clough in eral waters (see Fig. 2, OGJ, The The proposed e Sion would olve directional drilling from Irene into Tr on Ridge field state tidelands between Plains's existing fe ral lease and the sh .Irene is in 242 ft of water 4.7 miles f m land. Santa Barb County officials rejected imilaz proposal in 2002 from evo Energy Co. to develop Tran on Ridge field. Environme groups opposed Nuevo's propos To e support of environmental groups, s offered to shut exi g and new development operations in ses, all to be '~. ended or in 2022.This applies to the existing Poi Pedernales ^ ~ proj ,Lompoc onshore oil fields, and the Point Argu o project, ~ in g platforms Hidalgo, Harvest, and Hermosa, an e Gavi- o processing site. Tofkat-1 strikes oil on Alaska's North Slope The Tofkat-1 well sauck oil-bearing sandstone in the Kupazak formation on Alaska's North Slope, said partner Bow Valley Energy Ltd. lets contract for Devil Creek develop nt e Energy in Perth awarded the $260 million ( Dev- Development Project to Perth-based engin ing firm :s establishment of a shore from Apache's indeer gas field off Western P is 65 km southw of Karratha in the Pilb to process gas ia. Devil Creek Clough will pro a engineering, pr ement, and construc- tion for onshore facih s that will in de gas processing trains, compressors, and accom c The plant will treat and content, provide storage and as well as gas compression by a short pipeline to the a to Banbury. ate the gas, stabilize condensate load-out facilities for the liquids mg.The site will be connected u~gas trunkline from Dampier Apache said Dev' reek will be built a capacity of 300 tera- joules/day of gas ase 1 of the project urce gas from Rein- deer at about terajoules/day.The gas will used for domestic supply in W ern Australia. Phase expansion will come with the sanction the Julimar field, ich is still being appraised but which has a su antial gas res e that will take the plant up to its planned capacity. iquids production is expected to be 500 b/d. Phase 1 be on stream in early 2010 and Phase 2 probably in 2011. StatoilHydro drills long 1 Gulltopp well StatoilHydro drilled and completed the 9,9 honzon- taI Gulltopp well from the Gullfaks-A platform, in 439 ft o Drilling began in April 2005. Gulltopp began produ " month from the shallow Brent reservoir at u sea. Plat- form rig contractor Seawell Ltd. ost of the wellpath at an inclination of 7°. I counteract the friction, Seawell filled the 8- with air, instead of drilling mud, and "floated" the g in the nearly horizontal well. "This was the key to success," said StatoilHydro. The company had to upgrade the brake system on the drilling ~~ rig and the power suppl r ill~Tatform in order to complete the well. Stat ' mitially estimated the cost of drilling the e each well at $43.9 million, about 25% of the cost it es- tim sazy to develop Gulltopp using a subsea template and dedicated multip lines (OGJ, Feb. 9, 2004, Newsletter). StatoilHydro said in an I~ss release that the well was "considerably more expensive than initia Gulltopp is in the Tampen azea of the northern North Sea, 5 km north of Gullfaks satellite fields Gullveig and Rim- faks. It's operated by majority owner StatoilHydro 70%, on behalf of license pazmer Petoro AS 30%. Oi! & Gas /ournat / Apr. 21, 2008 9 April 2, 2008 Alaska Oil and Gas Conservation Commission 333 West 7`h Ave., Suite 100 Anchorage, AK 99501 RE: Brooks Range Petroleum Corp. Totkat #1 Data: Final LWD Well Logs Dear Mr. John Norman, Chair: Brooks Range Petroleum Corporation hereby transmits the Final LWD Well Logs for Tofl~at #1. Please sign in the space provided and return one copy of this transmittal letter. If you have any questions or require additional information, please contact me at 907- 865-5802. Sincerely, Dougl .Hastings Vice President of Exploration Brooks Range Petroleum Corp. Cc: Jim Winegarner Received this day of A ril, 2008. By: ~ Company: Name: l Al~,.~. ~G>1 ~a arti ~~'~ ~°~-~ ~3 ~ l6a~a 1 SARAH PALIN, GOVERNOR AittZ-7i7•A OI~ ~ ~5 333 W. 7th AVENUE, SUITE 100 CO1~T5ER~ATI011T COMDII55I01~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 March 24, 2008 Bart Armfield Vice President of Operations Brooks Range Petroleum Corporation 510 L Street, Suite 601 Anchorage, AK 99501 Re: Exploration Well, Tofkat No. 1 Brooks Range Petroleum Corporation Permit No: 207-173 Surface Location: 661' FSL, 1808' FEL, SEC. 11, T10NS, R5E, UM Bottomhole Location: 2012' FSL, 1204' FEL, SEC. 16, T10NS, R5E, UM Dear Mr. Armfield: When the permit for this well was issued, the API number listed on the Form 10-401 was in error. The correct API number for this well is 50-103-20567-00- 00. If you have any questions, please contact Steve Davies at 793-1224 or Tom Maunder, PE at 793-1250. Sincerely, Daniel T. Seamount, Jr. Chair Brooks Range Petroleum a subsidiary of A VCG, LLC 510 L Stn3et, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 21, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7d' Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Totkat #1(PTD # 207-173) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on Tofkat #1 for the period March 14 through March 18, 2008, inclusive. March 14, 2008 9,950' MW 10.8 ppg Vis 275 sec Inc158.17 deg POH wet to stinger, L/D same. M/iJ 8-1/2" clean-out assy, RIH. Tag hard cmt at 9,950', wt-tested to 20,000 lbs. Witnessed and approved by AOGCC rep. Circ to clean and balance mud. POH. M/U cementing stinger, RIH to place 2nd balanced cmt plug. March 15, 2008 9,950' MW 10.9 ppg Vis 265 sec Incl. 58.17 deg Finish RIH w/ stinger. Spot hi-vis pill 6,660' to 6,360'. Pump 15 bbl spacer followed by 45.6 bbls cement followed by 5 bbls spacer. POH to 5,385' and circ DP and stinger clear. POH. P/U clean-out assy, RIH. Kelly up at 5,500' and RIH looking for TOC at 6,860'. Not found. Pull up to WOC. March 16, 2008 9,950' MW 10.8 ppg Vis 275 sec Inc158.17 deg Wash down looking for cmt plug -none found. C&C hole at 6,550', green cmt at bottoms up. POH, M/U cementing stinger, RIH to 6,660'. Spot 15 bbl viscous pill, POH to 6,360'. Test lines then pump 13 bbls spacer followed 51.6 bbls cmt followed by 5 bbls spacer, displaced w/ 84 bbls mud. Pull 10 stds and circ out. March 17, 2008 6,1.53' MW 10.7 ppg Vis 58 sec Inc158.17 deg POH. L/D cmt stinger, M/U clean-out BHA, service rig, RIH. Look for cement at calculated tap of 5,512'. Wash to 5,791', indications of soft cement. CBU, WOC 4 hrs. Wash down to hard cement at 6,153'. C&C, POH. March 18, 2008 3,740' MW 10..1 ppg Vis 154 sec Incl 58.17 deg POH w/ cleanout assy, P/LJ and RIH w/ cmtg stinger on DP to 6,146'. Test lines and pump 15 bbls spacer followed by 35 bbls 15.8 ppg cement followed by S bbls spacer. POH 10 stds, circ out. POH to 4,718', spot 2S bbl viscous mud pill 4,718' to 4,400'. POH to 4,400', test lines and pump 15 bbls spacer followed by 53.2 bbls 17 ppg cement followed by S bbls spacer. CIP at 2200 hrs. POH to 3,460', circ out and POH. Release rig to Tofl~at #lA. FINAL REPORT. If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION ~'c~ ~e~raae Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 2 Page 1 of 2 Maunder, Thomas E (DOAj From: Bill Penrose (bill@fairweather.com] Sent: Friday, March 21, 2008 8:33 AM To: Maunder, Thomas E (DOA) Subject: RE: Weekly Drilling Ops Report -Brooks Range Petroleum T/ofkat #1 and Tofkat #1A Tom, "' After going through a lot of this in this well, I'm starting to get a feel for what's going on. It doesn't appear to be a contamination issue with the OBM, rather the hole geometry. The hole angle is 60 degrees and we're seeing indications that the viscous pills and then cement plugs are slipping down the low side of the hole, swapping places. In particular, the viscous pills, being the same weight as the rest of the mud system is swapping with the cement, the cement going down the low side and the pill slipping up the high side, before the cement has time to set. In the plug we're trying right now (surface casing shoe), we've added calcium chloride to the cement as an accelerator and made our underlying viscous pill the same weight as the cement. In my mind, the mud downhole will be working at swapping with the viscous pill while the cement sets. I have high hopes for this method -we'll know when we try to tag the plug later today. Regards, ~t~ ~C~l~lOde Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov) Sent: Friday, March 21, 2008 8:14 AM To: Bill Penrose Cc: Tim Winegarner Subject: RE: Weekly Drilling Ops Report -Brooks Range Petroleum Tofkat #1 and Tofkat #1A Bill, Thanks for the reports. Interesting that three of the plugs did not set. Don't remember seeing that before, but it may point to incompatibilities with the OBM. 1 am glad that tagging was your original proposal and it was not changed. This is a lesson learned for future OBM plugging. Sorry you all had to be the data point. Best regards, Tom Maunder, PE AOGCC From: Bill Penrose [mailto:bill@fairweather.com] Sent: Friday, March 21, 2008 7:40 AM To: Maunder, Thomas E (DOA) Cc: Tim Winegarner Subject: Weekly Drilling Ops Report -Brooks Range Petroleum Tofkat #1 and Tofkat #lA Tom, 3/24/2008 • ~ Page 2 of 2 Please find attached the weekly operations reports for the subject wells. Regards, ~~ ~~~ Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 3/24/2008 Page 1 of 2 Maunder, Thomas E (DOA) From: Bill Penrose [bill@fairweather.com] Sent: Tuesday, March 18, 2008 8:09 AM To: Maunder, Thomas E (DOA) Subject: RE: Tofkat #1 (207-173) P&A Thanks, Tom. Your understanding of my message re TOC is correct. The deepest the TOC will be is 5,860'. We in fact intend to pump a little extra to make sure it comes that high and then some. Regards, ~~ jdecvtoQe Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Tuesday, March 18, 2008 8:05 AM To: Bill Penrose Cc: AOGCC North Slope Office Subject: RE: Tofkat #1 (207-173) P&A Bill, Chuck and I spoke a while ago regarding the plugging operations. Wth a hard bottom determined, not tagging is acceptable. As I understand you message, it is still intended to place sufficient cement to give a TOC of 5860'. Tom Maunder, PE AOGCC From: Bill Penrose [mailto:bill@fairweather.com] Sent: Tuesday, March 18, 2008 6:33 AM To: Maunder, Thomas E (DOA) Subject: Tofkat # 1 P&A Tom, We're working on setting the second open-hole cement plug in the Brooks Range Petroleum Tofkat #1. The interval to be abandoned is 6,120' - 6,306'. We laid a cement plug from 5,860' to 6,360' and waited 24 hours. When we went back in to tag, we found hard cement at 6,153'. The hard bottom was witnessed and approved by Chuck Scheve. We obviously need additional cement to cover the exposed hydrocarbon-bearing interval (6,120' - 6,153') and we intend to lay in sufficient cement to cover the interval 5,860' - 6,153' to complete the continuous plug. My question: Since we now have a hard bottom to set this supplemental plug on, can we set it then leave it without WOC and tagging up on it, instead moving up hole to work on Plug #3? Regards, Sc~ ~~ Vice President /Drilling Manager 3/18!2008 • ~ MEMORANDUM State of AI as ka TO: Jim Regg, ~?~~ 3~z.~~~ P. I. Supervisor Alaska Oil and Gas Conservation Commission DATE: March 14 2008 FROM: Chuck Scheve, Petroleum Inspector SUBJECT: Open Hole Plug Tofkat #1 PTD#207-173 ~ Friday, March 14,2008: I traveled to the Brooks Range Petroleum Corporation Tofkat, #1 exploratory location to verify location of the open hole cement plugs in this well. A continuous cement plug had been spotted in 2 stages from 12050 to 10250 estimated top of cement. After 12 hours WOC drill pipe was run in the hole to locate the top of ,~ cement. At a depth of 9950 the DP tagged up solid, the top of the Brookian Turbidite formation is at 10470. Saturday, March 15, 2008: I returned to the Tofkat #1 location where a cement plug had been spotted form 6360 to 5860 estimated top of cement. After 12 hours WOC Drill pipe was run in the hole to 6360 with no indication of solid cement. ~ Monday, March 17, 2008: I returned to the Tofkat #1 location where the above- mentioned open hole plug had been respotted. After 20 hours WOC drill pipe was run in the hole to 5896 with no indication of the cement plug. The decision was made to WOC another 4 hours. Drill pipe was then run in the hole and solid cement located at 6153'. The top of the Quannik formation is at 6120. SUMMARY: I witnessed two failed attempts to verify open hole cement plugs covering the Quannik formation and successfully verified the cement plug covering the Brookian Turbidite formations • Brooks Range Petroleum a subsidiary of A VCG, LLC 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 14, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #1(PTD # 207-173) Dear Mr. Norman, i`~~ 3~~~ This is a report of Brooks Range Petroleum Corporation's well operations on Toflcat #1 for the period March 7 through Mazch 13, 2008, inclusive. Mazch 7, 2008 13,174' MW 10.7 ppg Vis 124 sec Incl 58.17 deg Continue to log up w/ CSAT. Pull side entry sub to surface, pull WL, pull side entry sub from drill string. RIH w/ DP and logging tools to 9,900'. Install side entry sub and pump down WL wet connect to logging tools. Log down w/ DSI 9,950' to 13,050'. Log back up w/DSI 13,050' to 9,950'. RIH for CSAT log. Mazch 8, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg RIH to 13,050' and log up w/ CSAT, taking checkshots along wellbore path. POH to side entry sub, unlatch and POH WL, remove side entry sub. RIH w! DP and logging tools to 12,058'. C&C mud. POH into casing shoe. Slip and cut drilling line. March 9, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg POH, L/D logging tools. Clear floor, M/tJ MDAT logging tools on DP and RIH to 10,187'. R/U side entry sub and pump wet connect on WL. Log down with MDAT, taking pressures and samples, 10,187' to 11,003'. Mazch 10, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg Continue running MDAT log on DP. Make pressure and sample sets between 11,017' and 11,943'. Unlatch WL and POH to make additional, shallower sets. • March 11, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg POH to 5,909'. R/U WL, pump wet connect and latch MDT tools. Conduct MDT pressure and sample sets between 6,125' and b,298'. March 12, 2008 13,174' MW 10.7 ppg Vis 155 sec Inc158.17 deg Finish MDT sampling, POH to side entry sub. Unlatch and POH w/ WL, remove side entry sub f/ string. L/D logging tools, R/D and release all WL equip. Test BOPE. P/U 2-7/8" tubing cementing stinger on DP and RIH. March 13 2008 13,174' MW 10.8 ppg Vis 221 sec Inc158.17 deg CBU at 6,146', continue in hole to 12,350' Pump 25 bbl viscous pill to 12,050'. POH to 12,050', R/U cementers. Mix and pump 15 bbls spacer + 82.1 bbls cement, displace w/ 178 bbls OBM. POH to 11,100' and clear DP. Mix and pump 15 bbls spacer + 82.1 bbls cement followed by 15 bbls spacer. Displace w/ 160 bbls OBM. POH 11 stands, drop pipe wiper and CBU. POH. If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION ~cewra~e Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 2 a o a d a SARAH PALIN, GOVERNOR ~+ ~p°~a~ DPI ~i`tty ~ 333 W. 7th AVENUE, SUITE 100 COI~TSERQA'1'I01Q COj1II1iISSjO1Q ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 James R. Winegarner VP, Land and External Affairs Brooks Range Petroleum Corporation 510 L Street, Suite 601 Anchorage, AK 99501 Re: Exploration Well, Tofkat # 1 Sundry Number: 308-074 Dear Mr. Winegarner: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Due to travel logistics, 48 hour notice should be given. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of March, 2008 Encl. _ __ (~~ 3~~t'o ~ RECEIV` TATE OF ALASKA -~~~ ~r ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~`MAR ~ O 2O j~~' APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.2so AIB~ka ON ~ Gas Cons. Comm scion 1. Type of Request: Abandon ~ Suspend ^ O erational shutdown p ^ Pertorate ^ Wai age Other ^ Alter casing^ Repair well ^ Plug Perforations^ Stimulate ^ Time Extension ^ Change approved prograri^ Pull Tubing^ Perforate New Pool^ Re-enter Suspended Well^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Brooks Range Petroleum Corporation Development ^ Exploratory ^ 207-173 3. Address: Stratigraphic ^ Service ^ 6. API Number' ~~~~~ dooo 510 L Street, Suit 601, Anchorage, AK, 99501 50-~38~.59 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: Spacing Exception Required? Yes ^ No ^~ Tofkat #1 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADL 391013 32.5 Exploratory' 12. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13,174' - 7,703' 13,174' - 7,703' _ None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 16" 113' 113' N/A NIA Surface 3,865' 9-518" 3,898' 3,009' 5,750 psi 3,090 psi Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A NIA N/A NIA Packers and SSSV Type: Packers and SSSV MD (ft): NIA N/A 13. Attachments: Description Summary of Proposal ^ 14. Well Class after proposed work: Detailed Operations Program ^~ BOP Sketch ^ Exploratory 0 Development ^ Service ^ 15. Estimated Date for 12-Mar-OS 16. Well Status after proposed work: Commencing Operations: Oil ^ Gas ^ Plugged ^./ Abandoned ^~ 17. Verbal Approval: Date: WAG ^ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Bill Penrose 258-3446 Printed Name James R. Winegarner Title VP, Land and External Affairs Signature Phone Date t a ` ~ ~~ ~ 865-5804 !J J r r COMMISSION USE ONLY Conditio of approval: Notify C mmission so that a representative may witness Sundry Number:~J/~ ~4' Plug Integrity ~ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^ Other. ~~~\~ '~` ~ Subsequent Form Required: ~ f--~t'~ \.J ` APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: ~/~ Form 10-403 Revised 06/2006 ~~~ ~ ~ ~ Submit in Duplicate s • Brooks Range Petroleum Corporation Totkat #1 Cement Plug Procedure General The following hydrocarbon-bearing zones are required by the AOGCC to be covered with cement (minimum 50' below to 100' above each zone) during abandonment of the open hole: Qannik Brookian Turbidite 2 Brookian Turbidite 1 Kuparuk 6,120' - 6,306' 10,470' -10,720' 10,970' -11,210' 11,914' -11,952' In addition, a cement plug will need to be set across the 9-5/8".casing shoe at 3,898' MD. Cement plugging of the hydrocarbon-bearing zones will be achieved by setting isolation cement plugs as follow. Also, a densified cement plug will be placed across the 9-5/8" casing shoe for kicking off the Tofkat #lA sidetrack. Isolation Plug #1 Stage 1 Stage 2 Isolation Plug #2 Kickoff Plug #3 Brooks Range Petroleum Corporation 11,100' to 12,050' MD. 10,250' to 11,100' MD 5,860' to 6,360' MD 3,800' to 4,400' MD With oil-base mud in the hole, a spacer containing a surfactant will be pumped ahead of and behind each plug to prevent contamination of the cement. Open hole cement volumes include 30% excess. Plugs #1 (Open hole) 1. M/LT a muleshoe to 1,000' of 2-7/8" cement stinger and cross over to 5" drill pipe. 2. RIH with 2-7/8", 6.5# tubing with mule shoe as cementing stinger on 5" drill pipe at 12,350'. 3. Place a 25-bbl viscous pill from 12,350' to 12,050' to slow cement's tendency to run downhole. 4. POH to 12,050' and circulate and condition mud. 5. Pump 5-10 barrels of water ahead 6. Set a balanced cement plug from 11,100' to 12,050' as follows: Pump 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. ti ~~~~ Follow with 82.1 bbls (401 sx) Premium cement + 0.4% Halad-344 (Fluid Loss Additive), + 0.2% CFR-3 (Dispersant), + HR-5 (Retarder) as required. 7. POOH to one stand above 11,100' and circulate excess cement out of drill string. RIH to 11,100' and set a balanced plug from 10,250' to 11,100' as follows: Pump 15 bbls Alpha Spacer with 1 gal/bbl surfactant 434B at same weight as mud. Follow with 82.1 bbls (401 sx) Premium cement + 0.4% Halad-344 (Fluid Loss Additive), + 0.2% CFR-3 (Dispersant), + HR-5 (Retarder) as required. Follow with 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. 8. Pump 1-2 bbls of water behind. POH ten stands, CBU and POH. 9. M/U clean-out BHA and RIH to the casing shoe. WOC until a total often h`ou_rs has elapsed since setting the cement plug. ~.~1 ~S~~CC~ C 10. RIH, tag cement and dress off plug. Set 20K lbs weight on it. If it will not take 20K lbs weight, pull up, circulate out and wait an additional four hours to try again. 11. After a successful weight test of the plug, POH and pick up the cementing stinger. Plug #2 (Open hole) 12. RIH to 6,360' and place a 500' balanced plug from 5,860' to 6,360' as follows: Pump 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. .~^,3~~Za ~S Follow with 45.6 bbls (223 sx) Premium Cement+ 0.4% Halad-344 (Fluid Loss Additive), + .2%CFR-3 (Friction Reducer), + HR-5 (Retarder) as required. Follow with 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. 13. Pump 1-2 bbls of water behind. POH ten stands, CBU and POH. 14. P/LT clean-out BHA and RIH to the casing shoe. WOC until a total often hours has elapsed since setting the cement plug. 15. RIH, tag cement and dress off plug. Set 20K lbs weight on it. If it will not take 20K lbs weight, pull up, circulate out and wait an additional four hours to try again. 16. After a successful weight test of the plug, POH and pick up the cementing stinger. Plug #3 (Casing Shoe Plug) 17. R1H to 4,400' and place a balanced cement plug across casing shoe (100' inside 9-5/8" surface casing shoe to 500' below shoe in 8-1/2" open hole) as follows: Pump 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. Follow with 53.2 bbls. (302 sx) Premium Cement+ .8% CFR-3 (Dispersant), + 0.3% Halad-344 (Fluid Loss Additive), + HR-5 (Retarder) if required. Follow with 15 bbls Alpha Spacer with. l gaUbbl surfactant 434B at same weight as mud. 18. Pump 1-2 bbls of water behind. POH ten stands, CBU and POH. 19. P/LT clean-out BHA and RIH to the casing shoe. WOC until a total of eight hours has elapsed since setting the cement plug. 20. R1H, tag cement and dress off plug. When it is firm enough to take a drilling weight (1 OK - 20K lbs), drill the cement to 3,925' (27' outside the casing shoe). 21. POH to pick up directional drilling assembly for drilling the Tofkat #lA sidetrack. Brooks Range Petroleum Corporation Tofkat #1 Wellbore Schematic PROPOSED P&A 12-1/4" hole TOC at 3,800' BOC at 4,400' ~= ~ ~'~~ 10.7 ppg TOC at 5,860' BOC at 6,360' TOC at 10,250' BOC at 12,050' 10.7 ppg mud 16" conductor at 110' 9-5/8" casing at 3,898'MD Quannik Interval 6,120' - 6,306' MD 10.7 ppg s 8-1/2" hole mud Brookian Turbidite 2 10,470' - 10,720' MD Brookian Turbidite 1 10,970' - 11,210' MD 10.7.ppg 4 11,914'-11,952'MD 4 mud 6 TD at 7,713' TVD, 13,174'MD WIP 3/10/08 • Brooks Range Petroleum Corporation March 10, 2008 i „ ~,~E,I~ MAR 1. ~ ~~ Mr. Dan Seamount, Chair ~ 011 & Cas ~~~~~ ~~~ Alaska Oil and Gas Conservation Commission anchorage 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Sundry Application to Plug and Abandon Brooks Range Petroleum Corp. Tofkat #1 (PTD # 207-173) Dear Mr. Seamount, Brooks Range Petroleum Corporation proposes to plug and abandon the open-hole portion of its Tofkat #1 well. It is intended to plug the well back to the shoe of the surface casing then sidetrack the well to a new bottomhole location. The Application for Permit to Drill Tofkat #lA has been submitted under separate cover. Two open-hole cement plugs are proposed, one across the Kuparuk - Brookian Turbidite interval and one across the shallower Qannik interval as indicated on the enclosed wellbore schematic. The wireline and mud logs from this well have been reviewed with AOGCC staff for their concurrence on the cemented intervals and our plan to abandon them. The abandonment of Tofkat #1 will be accomplished as indicated on the attached wellbore diagram and P&A procedure. If you have any questions or require additional information, please contact me at 339- 9965 or Bill Penrose at 258-3446. Sincerely, BROOKS RANGE PETROLEUM CORPORATION ./ ~ G~ James R. Wineg er Vice President - d and External Affairs cc: Bill Penrose attachments ORIGINAL Brooks Range Petroleum a subsidiary of A VCG, LLC 510 L Stn:et, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 7, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #1(PTD # 207-173) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on Tofl~at #1 for the period February 29 through March 6, 2008, inclusive. February 29, 2008 10,603' MW 10.6 ppg Vis 80 sec Inc159.90 deg Directionally drill 8-1/2" hole 10,603' to 11,175'. CBU, make 11 stand wiper trip. Hole in good condition. Drill and slide 11,175' to 11,275'. Change out 2 piston rubbers on #2 mud pump. Directionally drill 11,275' to 11,842'. March 1, 2008 12,794' MW 10.6 ppg Vis 147 sec Inc159.24 deg Directionally drill 8-U2" hole 11,842' to 12,050'. CBU, make 10 stand wiper trip. Hole in good condition. Drill and slide 12,050' to 12,698'. Clean suction screens on both mud pumps and replace 2 discharge valves. Drill 12,698' to 12,794' -too much pump noise to get downhole signal. Change swab in #2 mud pump, change out pulsation dampener. March 2, 2008 13,174' MW 10.6 ppg Vis 147 sec Inc158.17 deg Circ and work pipe while working on mud pump pulsation dampener. Make MAD pass 12,698' to 12,793'. Control drill 8-1/2" hole 12,794' to 13,174' TD. Pump 20-bbl weighted sweep, make 20-stand wiper trip -hole in good condition. C&C well, POH for logs. CJ March 3, 2008 13,174' MW 10.7 ppg • Vis 122 sec Inc158.17 deg Finish POH. L/D BHA, R/LJ wireline for logging. P/(J DSI tool and discover short. Trouble shoot tool and decide to change out for a new one. Change out logging tool and RIH. March 4, 2008 13,174' MW 10.7 ppg Vis 124 sec Incl 58.17 deg Continue RIH w/ DSI on wireline, would not go past 4,040'. POH and L/D logging tool. Test BOPE. M/LT DSI and CSI logging tools on DP and RIH. At 3,500' insert side entry sub and pump down wet connect. Check tool communication - OK. Clamp off wireline and RIH w/ logging tools to 3,683'. March 5, 2008 13,174' MW 10.7 ppg Vis 124 sec Inc158.17 deg RIH to 7,000', latch up DSI. Log DSI up to csg shoe. RIH to 7,074', log up w/ CSAT, taking check shots at 12 points along wellpath.. March 6, 2008 13,174' MW 10.5 ppg Vis 124 sec Inc158.17 deg Finish logging up w/ CSAT. Unlatch, R/D side entry sub. RIH to 6,800', install side entry sub and pump down wet connect. Log DSI down 6,883' to 10,390'. Repeat section 10,390' to 10,147'. Log ..CSAT coming up from 10,374' taking checkshots along wellpath. If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION SiPP ~e~aQe Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 2 510 L Street, Suite 601 " Anchorage, AK 99501 * Phone {907) 339-9965 "Fax (907) 339-9961 February 29, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 3 `` Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #1 (PTD # 207-173) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on Toflcat # 1 for the period February 22 through February 28, 2008, inclusive. February 22, 2008 7,785' MW 10.0 ppg Vis 90 sec Incl 59.01 deg Directionally drill 8-i/2" hole 6,100' to 6,822'. Short trip to 6,250', tight and trying to pack off. Work string and clean up hole. RIH to btm, circ hole clean. Short trip to 5,764', pulled tight, worked string and drag dropped off. R1H to btm -hole slick. Directionally drill 6,822' to 7,785'. CBU, prep to short trip. February 23, 2008 8,940' MW 9.8 ppg Vis 84 sec Incl 60.60 deg CBU 3 times. POH to 6,000', work tight spat 6,305' - 6,250'. RIH to 7,785' - no fill. Directionally drill 8-112" hole 7,785' to 8,747'. Short trip to 7,688', wiping minor tight spots. RIH to btm -hole slick. Drill 8,747' to 8,940'. February.24.2008 10,092' MW 10.0 ppg Vis 66 sec Intl 59.80 deg Directionally drill $-1/2" hole 8,940' to 10,092'. CBU. POH, L/D 4" DP tc> change it out with 5" DP (hit hydraulic limit with 4" DP). February 25,.2008 10,092' MW 10.0 ppg Vis $6 sec Intl 60.69 deg Cont. POH and LID 4" DP. Hole tight at 8,743', 6,300' and 6,000'. LID HWDP and BHA. 1 Brooks Range Petroleum a subsidiary of AVCG, LLC • • February 26, 2008 10,092' MW 10.0 ppg Vis 86 sec Incl 60.69 deg L/D MWD and LWD tools. Clear floor of 4" handling tools, P/IJ 5" tools. Change out saver sub and lower kelly valve on top drive. P/CT, M/U and SIB 37 stands 5" DP in derrick. Test BOPE. February 27, 2008 10,092' MW 10.1 ppg Vis 100 sec Incl 60.69 deg Finish testing BOPS. M/IJ BHA and test. RIH, picking up singles off rack. Ciro at shoe while servicing/repairing rig. RIH, work through tight spot at 4,080'. RIH, work on tight spot at 6,000' . February 28,.2008 10,603' MW 10.4 ppg Vis 80 sec Incl 59.90 deg Continue RIH, picking up joints of 5" DP off the rack. Wash and ream as necessary when cuttings beds pile up in front of bit. Directionally drain 8-i/2" hole 10,092' to 10,603'. If you have any questions ar require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION S~c~ ~e~rade Bill Penrose Vice President /Drilling Manager Fairweather EBcP Services, Inc. cc: Jim Winegarner -Brooks Range 2 Brooks Range Petroleum a subsidiary of AVCG, LLC 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone 1907) 339-9965' Fan 1907) 339-9961 February 22, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 2-(~~ RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofka# #1(PTD # 207-173) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on the Toflcat #1 for the period February 15 through February2l, 2008, inclusive. February 15, 2008 3,895' MW 9.8 ppg Vis 112 sec Incl 60.69 deg Directionally drill 12-1/4" hole 2,557' to 2,700'. Repair drag chain in pits. Directionally drill 12-1/4" hole 2,700' to 3,895'. February 16, 2008 3,911' MW 9.6 ppg Vis 102 sec Inc160.69 deg Directionally drill 12-1/4" hole 3,895' to 3,911'. CBU, short trip to 2,160' and back to btm - no tight spots or fill. Pump hi-vis sweep and POH. L/D BHA. Make dummy run with casing hanger on landing jt. RJU to run 9-518" casing. February 17, 2008 3,911' MW 9.7 ppg Vis 55 sec Inc160,69 deg Run 9-5/8" casing to 3,857'. M/U csg hgr and landing jt, wash csg down until hgr landed out. Circ one csg volume. R/U to cmt. While reciprocating casing, pump 10 bbls H2O and pressure test lines. Pump 10 bbls 10.3 Ppg spacer followed by 304 sx 10.1 ppg lead cement and 385 sx 15.9 ppg tail cement. Displace with mud using rig pumps. Bump plug and hold pressure at 1,300 psi for 10 min. Release pressure -floats held, Clean up cellar, R/D cementers, clear floor. Flush stack and hole fill line. N/D diverter line and diverter valve. 9-5/8" FC at 3,812', FS at 3,898'. • February 18, 2008 3,9i 1' MW 9.7 Vis 55 sec Inc160.69 deg N/D diverter and riser. Remove diverter system from cellar, bring in starting flange and multi-bowl wellhead system. N/U and test starting head -test failed. Re-torque and re- test - NG. Call for wellhead specs and serial numbers, bring more tools from KRU shop. N/D wellhead, remove seal sub. N/U wellhead and torque to spec. N/U adapter flange, lift stack off, replace API rings on upper and lower mud cross, set stack an wellhead, N/U and tighten all three flanges, hook uP kill line and prepare to test casing to 3,000 psi (procedure approved by AOGCC rep on location}. Pressure test casing and wellhead to 3,000 psi for 30 minutes -good test. February 19, 2008 3,911' MW 9.7 ppg Vis 55 sec Inc160.69 deg N/LT remainder of BOP stack. Test BOPS to 25415,000 psi, annular to 2,500 psi.. Test witnessed by AOGCC rep. M/U BHA, RIH to 955'. PIU DP while RIH to 3,805'. Tag cmt, set down lOk lbs. Drill to FC at 3,812', Circ drily. c~aat out of hole and test casing to 3,000 psi. Drill out FC and cmt to 3,840'. February 20. 2008 3,931' MW 10.1 ppg Vis 100 sec Inc160.69 deg Finish drilling out shoe track and rat hole to 3,911'. Displace spud mud out of weilbore with oil-base mud. POH, standing back DP. M/U drilling BHA and RIH, picking up DP off rack. Dri1120' of new hole to 3,931'. Balance mud and conduct leakoff test to 15.3 ppg EMW. February 21, 2008 6,100' MW 10.0 ppg Vis 118 sec Ine159.27 deg Directionally drill 8-1l2" hole 3,911' to 4,898'. Short trip to shoe at 3,897' and back to btm -hole in good shape. Drill 4,898' to 5,860'. Short dip to 4,897' and back to btm. Minor tight spots at 5200', 5080' and 4900' -went away after working. Drill 5,860' to 6,100' If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION ~~ ~ Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 2 Page 1 of 2 • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Friday, February 22, 2008 10:16 AM To: Bill Penrose Subject: RE: Thanks Bill_ I agree regarding the compressibility. Based on a calculation I use, the compressibility ratio is about 1.5. Tom From: Bill Penrose [mailto:bill@fairweather.com] Sent: Friday, February 22, 2008 9:48 AM To: Maunder, Thomas E (DOA) Subject: RE: Tom, 1. About 80 bbls of good cement were received back at surface during the cement job. 2. The csg test and LOT information are attached. Note that the casing test was conducted with water base mud in the hole and the subsequent LOT was conducted after the change-over to oil base mud. The resultant difference in the slopes of the curves offers an interesting demonstration of the different compressibilities of the two systems. S~i~ ~e~de Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, February 22, 2008 8:31 AM To: Bill Penrose Cc: Jim Winegarner Subject: RE: Bill, Thanks for the report. Significant progress. Couple of requests ... 1. How much cement was circulated? 2. Can you provide the LOT/casing test information? Regards, Tom Maunder, PE AOGCC From: Bill Penrose [mailto:bill@fairweather.com] Sent: Friday, February 22, 2008 7:35 AM To: Maunder, Thomas E (DOA) Cc: Jim Winegarner Subject: --~. ` ~.. -~' ~~"~~ , r E3 i ~~;'.~ 6/24/2008 • Tom, Please find attached the weekly operations report for Brooks Range Petroleum's Tofkat #1. Regards, ~!~ ~EsyL0~Q8 Vice President /Drilling Manager Fairweather E8P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 Page 2 of 2 6/24/2008 ~ ~ ao`~-i~~ CASING AND LEAK-OFF FRACTURE TESTS Well Name: Tofkat Date: 2/20/2008 Csg Size/Wt/Grade: 9.625 40 L80 Supervisor: Jack Keener Csg Setting Depth: 3898 TMD 3047 TVD Mud Weight: 10.1 ppg Leakoff pressure = 820 psi LOT= 15.28 ppg Hole Depth = 3930 and Fluid Pumped= 4.0 Bbls Volume Back = 3.8 bbls Estimated Pump Output: 0.100 Barrels/Stroke LEAK-OFF DATA CASING TEST DATA Enter Strokes Enter Pressure Enter Strokes Enter Pressure Here Here Here Here _> a _> a a a a a a .a _> a a a a a _> a .> -? 4 180 8 240 12 345 16 425 20 500 24 550 28 T 620 32 700 36 730 40 830 42 820 42 820 Enter Holding Inter holding Time Here Pressure Here 0 830 2 ~- -- - 820 5 820 _> _> a a a a a a a s a a a a a a a a a a a a a a 5 500 10 800 ~ 15 1200 20 1600 25 2200 30 2600 35 3100 Enter Holding Enter Holding Time Here Pressure Hen 0 3100 2 3100 4 3100 6 3100 8 3100 9 3100 ~-LEAK-OFF DATA CASING TEST DATA u 4000 - ....._T.__., e.__...~_-- _.. ____._._W___,. 3900 ~ ~ i 3800 3700 3600 ~ 3500 I 3400 3300 { 3200 3100 3000 2900 2800 2700 2600 2500 2400 2300 2200 a 2100 2000 N m 1900 a` 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 _ --- - ± _ i -- i - i -- ~ I 1 E ~ ~ _ ~- _ ~ _ _. ~ - ~~ ~ -- -- - ~, __f ~~ _ - _ - _. _. ~_ -- ~ - _ ~ - f 1 I I I i f -- .._- I I - -- - E - - ~ - __ _ __ __- - - -- ~ - - i -~ ~ i - - rt--- -- - T - - ~~ -- -~- - i -- ~ - - - -- -- - - ~ - ~ II _ - - ' r -- -- - - - ------ L-- 400 300 - - 200 100 0 0 ~- ~-- 10 20 30 40 50 Strokes (# o~ L~ -- -•F LEAK-OFF DATA -~ CASING TEST DATA 4000 - 3900 ~ ~ ~- - ~ 3800 3'700 3600 3500 3400 3300 { 3200 } 3100 i 3000 } 2900 2800 2700 2600 2500 2400 2300 2200 ?2100 V 7 2000 N m 1900 a 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 - - ---~ ~ -~ ---~-- ~ - i i ~- i ----- -'- ----I ~ _ -- ~~~ i -~ ---- ~ - __ ~ ~ 3 ~ I~ - - - ~ I iF ~ ^ a ~ _ - -~ ~ - - j - s ~~ -~ --~ ~ ~ T -~----~ - I I ~ i ~ --` - - I i -i --- r ~~ - --- ( s _. -- ~ T ~ i j ~ ~ __ I ~ { __ _ i __ __ - --- ~~ ~ + i ~ .. _ _~ --F ~ ~ 1 j i 200 - -- -- 100 - -- 0 0 5 10 15 20 25 30 Time (Minutes) Brooks Range Petroleum a subsidiary of A VCG, tiC 510 l Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 February 15, 2008 Mr. John Norman, Chair ~ ~ ~~- ~ ~ ~ Alaska Oil and Gas Conservation Commission 333 West 7~` Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #1(PTD # 207-173) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on the Tofkat #1 for the period February 8 through Februaryl4, 2008, inclusive. February 8, 2008 $0' MW N/A Vis NIA Incl 0.00 deg Rig subbase & .derrick arrived on loc. Move road tires up into drilling position, set matting boards and herculite. Trucks returned to North Shore # 1 for satellite camp and pipe shed. February. 9, 2008 80' MW N/A Vis N/A Inc10.00 deg Satellite camp and pipe shed arrived. Set matting bards and herculite, spot subbase over hole. Set in place motor, pump and pit modules and pipe shed. Rig steam lines and activate same. Berm rig. Cut off conductor, install landing ring and speed head and test same to 5,000 psi. Repair gate valves in pits. Februar~0, 2008 80' MW N/A Vis N/A Inc10.00 deg Spot 20" annular in cellar, button up cellar. Hook up electrical, service and interconnects throughout rig. Hook up pipe skate rails, finish beaming rig, clean up around rig. Test gas sensors, function test top drive and drawworks. N/U diverter and diverter line. • February 11, 2008 80' MW N/A Vis N/A Intl 0.00 deg N/LT diverter, diverter line, diverter hydraulics and knife valve. Clear floor, perform rig repairs and maim. Function test diverter w! AOGCC witness. P/U DP and rack back in derrick. February 12, 2008 827' MW 4.5 ppg Vis 283 sec Incl 7.22 deg Finish rigging up. Finish PIU DP, P/U HWDP and stand back. Fill circulating system and check for leaks. Hold spud ~neetng w/ crew. M/U BHA, test pumps and lines to 4,000 psi. RIH, tag bottom at 123' RKB, Drill 12-114" hole fl 123' to 275'. POH 2 stands to add additional BHA components. Directionally drill f/ 275' to 827'. February 13, 2048 2,059' MW 9.4 ppg Vis 152 sec Intl 37.92 deg Directionally drill 827' to 1,204'. Short trip to 180' then back to btm. Hole in good condition. Directionally drill 1,204' to 2,059, pumping nut plug sweeps for bit balling. February 14, 2008 2,557' MW 9.6 ppg Vis 174 sec Intl 52.47 deg Directionally drill 2,059' to 2,166'. CBU and POH -hole in good shape. Adjust BHA, change bit and RIH. Directionally drill 2,166' to 2,557'. If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION ~~ ~~ Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegamer -Brooks Range 2 510 L Street, Suite 601 * Anchorage, AK 99501 '~ Phone (907) 339965 "Fax (907) 339-9961 February 8, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations ~}-~ Brooks Range Petroleum Corp.: Tofkat #1(PTD # 207-173) ~. `~ Dear Mr. Norman, l This is a report of Brooks Range Petroleum Corporation's well operations on the Tofl~at # 1 for the period February 6 through February7, 2008, inclusive. February 6, 2008 80' MW N/A Vis N/A Incl 0.00 deg Accept rig at 0300 hrs, February 6. Move pit module, motor module, pump module and portions of pipe shed from North Shore #1 location to Tofkat #1 pad. All DP, DC and other minor components already on location. Camp is set and ready to receive personnel. February 7, 2008 80' MW N/A Vis N/A Inc10.00 deg Wait for rig move equipment to travel from Tofl~at #1 location back to North Shore #1. Hook up to rig subbase/derrick module and tow to Tofkat. Meanwhile, move crews into camp at Tofkat and prepare rig components for mating up once subbase/demck arrives. If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION ~c~ ~e~ade Bill Penrose Vice President l Drilling Manager Brooks Range Petroleum a subsidiary of A VCG, LLC Fairweather E&P Servi• Inc. cc: Jim Winegarner -Brooks Range Page 1 of 1 Mahnken, Christine R (DOA) From: Johnson, Elaine M (DOA) Sent: Wednesday, January 23, 2008 11:59 AM To: Saltmarsh, Arthur C (DOA) Cc: Davies, Stephen F (DOA); Fleckenstein, Robert J (DOA); McMains, Stephen E (DOA); McIver, C (DOA); Mahnken, Christine R (DOA) Subject: API number revised in RBDMS Art, I revised the API Number from 50-029-23381-00-00 to 50-103 ~. -00-00 for 207-173-0, TOFKAT 1 as follows: tbIWellMaster, tbIWellHistory, tbIWellLeases, tblLocMaster, cascading to tblLocSub, tblLocSubCo~ tblAppRequirements 1 Record 5 Records 4 Records 1 Record 1 Record Ord, 1 Record 1 Record Any bond information will have to be re-entered. If you find other invalid records for this permit, please let me know. Elaine 2/4/2008 AOGCC Web (DOA sponsored) From: Miller, Eddie [Eddie.Miller@ihs.com] Sent: Wed 1/23/2008 9:16 AM To: AOGCC Web (DOA sponsored) Cc: Subject: Drilling Statistics>Drilling Data index>Weekly Drilling Reports>Week Ending January 20 Attachments: Approved Permits: Brooks Range Petroleum 1 Totkat is listed with a well location in Harrison Bay Quad but has a Beechey Point API number. Has there been a correction? Thanks, Ed Ed Miller IHS Regional Supervisor West Coast/Alaska Energy 15 Inverness Way East, MS D302 Englewood, CO 80112 Tel 800-645-3282 ext 3641 Direct 303-736-3641 eddie.miller@ihs.com www.ihs.com/energy ~ `~~ ~D~~ ~~~ ,a~~ ~ ~,~~3 ~1~ ~ ,~~ /~~~ • McIver, G (DOA) • From: Johnson, Elaine M (DOA) Sent: Wednesday, January 23, 2008 11:59 AM To: Saltmarsh, Arthur C (DOA) Cc: Davies, Stephen F (DOA); Fleckenstein, Robert J (DOA); McMains, Stephen E (DOA); McIver, C (DOA); Mahnken, Christine R (DOA) Subject: API number revised in RBDMS Art, I revised the API Number from 50-029-23381-00-00 to 50-103-20567-00-00 for 207-173-0, TOFKA71 as follows: tbIWellMaster, tbIWellHistory, tbIWellLeases, tblLocMaster, cascading to tblLocSub, tblLocSubCo~ tblAppRequirements 1 Record 5 Records 4 Records 1 Record 1 Record Ord, 1 Record 1 Record Any bond information will have to be re-entered. If you find other invalid records for this permit, please let me know. Elaine 1/23/2008 ~"R ~ { 1 Y~ ~..~ ~ ~~$ ~ ~ ~ ~ ~ ~ ~~ ~ ~~ ~ ~i ALASSA OII, AHD GA-S COHSERQATIOPIT CO1rIIrIIS3IOH Bart Armfield Vice President of Operations Brooks Range Petroleum Corporation 510 L Street, Suite 601 Anchorage, AK 99501 SARAH PALlN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Exploration Well, Tofkat No. 1 Brooks Range Petroleum Corporation Permit No: 207-173 Surface Location: 661' FSL, 1808' FEL, SEC. 11, T10NS, R5E, UM Bottomhole Location: 2012' FSL, 1204' FEL, SEC. 16, T10NS, RSE, UM Dear Mr. Armfield: Enclosed is the approved application for permit to drill the above referenced exploration well. Please note that this permit authorizes drilling activities in the planned hole section only. A separate permit applications must be submitted to plug back or abandon and redrill new hole sections. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. A mudlog and samples are required for this remote exploratory well. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals below conductor pipe and 10' sample intervals through target zones. At a minimum, openhole gamma ray, resistivity, and sonic or density porosity logs must be recorded from the base of conductor pipe to total depth of the Brooks Range Petroleum Corp. Tofkat # 1 Permit: 207-173 well. If formation testing is planned, submitted in advance of the operations. a Sundry Notice (Form 403) must be Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). DATED this ~ day of January, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALA ~ OIL AND GAS CONSERVATION COM ~~510N PERMIT TO DRILL L ~r,l 20 AAC 25.005 R~c~~v~® JAN 1 5 200 1a. Type of Work: 1b. Current Well Class: Exploratory Q - Development Oil ^ 10. Specify if well is proposed r. hh ~ Drill Q ^Redrill ^ Stratigraphic Test ^ Service ^ Development Gas ^ r Coalbed Methane ^ ~~G~S~rates ^ Re-entry ^ Multiple Zone ^ Single Zone ^ Shale Gas ^ 2. Operator Name: 5. Bond: Blanket ~ Single Well ^ 11. Well Name and Number: Brooks Range Petroleum Corporation Bond No. LPM 8842179 Tofkat #1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 510 L Street, Suit 601, Anchorage, AK, 99501 MD: 13,630' TVD: 8,200' ~ 4a. Location of Well (Governmental Section): 7. Property Designation: flbG ~~'fGf ~ Exploratory Surface: 661'FSL 1808'FEL S11 T10N-R5E l~t~~ ~`~f~s ADL 391013 ~/~4~G~cy(,'7 ~ . - Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2704'FSL 4707'FEL S15 T10N-R5E N/A 12/31/2008 Total Depth: 9. Acres in Property: 14. Distance to Nearest 2012' FSL 1204'FEL S16 T10N-R5E 2560 Property: 51~8'y> iN..~ (-4 .~?~ 4b. Location of Well (State Base Plane Coordinates): ~ ASP N27 3 10. KB Elevation 15. Distance to Nearest Well Surface: x- wZL3`~' y_ 5,934,106 S;y3`~i Zone- 4 (Height above GL): 32.5 feet 1AEitl~+p-PeeF: 4.1 miles 16. Deviated wells: / ,. ~'~ ~ Kickoff depth: X500 feet /'~~ 17. Maximum Anticipat';e//da~~P/r~, ssures in psig (see 20 AAC 25.035) ' Maximum Hole Angle: 58.02 degrees Downhole: ~24 ~psi 7~T~ ~ v.~&urF e: .3,447 psi 18. Casing Program: Specifications To p -Setting Dept -Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 16" 80' 80' 80' Grouted to surface 12-1/4" 9-5/8" 40# L-80 BTC 3,832' 0 0 3,832' - 3,000' ~ 1201 cu ft to surf. + 150% XS 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Filing Fee Q BOP Sketch Q Drilling Program Q Time v. Depth Plot Q Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ^ Drilling Fluid Program Q 20 AAC 25.050 requirements ^ 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Bill Penrose 258-3446 Printed Name art Armfield Title Vice President -Operations Signature Phone 865-5840 Date Q Commission Use Only Permit to Drill ~~r/~''~7 -°7 N b -- ~ ~ API Number: G ~~ ~ - ~ j~~ ~ - ~ Permit Appro I ~ See cover letter for other um er. ,C,v / / ,~ 50- Date: ~' requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalb d me ane, gas hydrates, or gas contained in shales:[+]~ Other: Samples req'd: YesO No^ Mud log req'd: Yes^~ No^ (~~ ~ ~~©V PSt~~ ~"y p`~~~~~'- H2S measures: Ye No[~ Directional svy req'd: Yes[ No^ 1 1 ~ oil APPROVED BY THE COMMISSION DATE: ~' ~ 8 ,COMMISSIONER Form 10-401 Revised 12/2005 U ~~ ! 1 L ~ Submit in Duplica ~./'jdB ADMIRALTY i- BAY BEAUFORT SEA SMITH BAY TOFKAT 1 1 ~HARRISON / " ~ _ BAY I g Creek "~ ~-~ ~~ "- 1 ~,c Y r Fish NUIOSUT tea' Vicinity Map NOT TO SCALE N SCALE: 1" = 200' NOTES: 1. COORDINATES SHOWN HEREON, BASED UPON GPS OBSERVATIONS (SUMMER 2007). 2. COORDINATES ARE NAD83, ALASKA STATE PLANE ZONE 4. 3. VERTICAL DATUM: MSL (GEOID 2006, ALASKA). 4. ALL DISTANCES AND ELEVATIONS ARE IN SURVEY FEET. 5. DATE OF SURVEY 09-12-07, 01/09/08. 6. SECTION LINES SHOWN HEREON ARE APPROXIMATE AND FOR REFERENCE ONLY. ALPINE RE-SUPPLY o~ ICE ROAD moo' 4 ri oa U 990' i (TO EXIST. PIPELINE) d " R 0, tJ (~3~O~p~ NE G~ ~G~~ 245' 165' ~ E OF G o~ ~ ~~ TOFKAT 1 d ~J / "p 200' / ' ~~ O~ / s 661 f' Po e N~ ~ \~E ,So 00 ~ p °o o°- F'OG TOFKAT 1 LOCATED WITHIN PROTRACTED SECTION 11, T.10 N., R.5 E. UMIAT MERIDIAN, ALASKA 661' FSL 1808' FEL NAD83 Datum ~ ^' N 70°13'47.013" W 150°47'31.893" 0 0 ASPC ZN4 w w N 5,934,067.69 rn cn E 1,542,273.37 ~ j NAD27 Datum N 70°13'48.186° '`' ``' W 150°47'20.701" `r' "' ASPC ZN4 ~ ~ N 5,934,319.60 z z E 402,239.10 ~ ° ° ~ ~ -1808±' ' T 10 N, R 5 E, UM SECTION 11 T 10 N, R 5 E, UM SECTION 14 KU U KP I K BROOKS RANGE PETROLEUM PROPOSED LOCATION ~~~LLIC TOALP NE, ALAS aLL tae E6,aA •Andimap.,~eesos•(aon278-teso DATE: 1/9/2008 DRAWN BY: AG SHEET: 1 ^F 1 adze dT® (90]] 6]OdT.9 Alpine Survey Office SCALE: 1" = 200' CHECKED BY: KP W.O. No: 07-z17 Z 0 U a • ~ Davies, Stephen F (DOA) From: Bill Penrose [bill@fairweather.com] Sent: Friday, January 18, 2008 8:09 AM To: Davies, Stephen F (DOA) Subject: Tofkat Logging Attachments: Tofkat #1 Fm Eval Program.pdf Steve, Page 1 of 1 I got your voice-mail message last evening. Here's the Tofkat formation evaluation program for inclusion in the application for PTD. Sorry for the omission. Regards, Bill Penrose Vioe President /Drilling Manager Fairvveather E8~P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 1/18/2008 Brooks Range Petroleum Corporation Totkat #1 Formation Evaluation Program Electric Lo~;?ing, Program Hole Section Section Len th MWD LWD OH Wireline CH Wireline 12-114" 3,900' Yes Gr/Res None None 8-1/2" 9,800' Yes Gr/ReslNeut/Dens Dipole sonic* None Checkshot survey MDT** * Dipole sonic will be run from TD to surface ** Contingent log Mud Logging Program Contractor: Sperry Log interval: From base of conductor casing to TD Service: 4 surface loggers of which two are supervisory/senior alternately on duty Equipment/Sensors 1. Gas Detector 2. Degasser 3. Stand Pipe Pressure 4. Pump Stroke 5. Hook Load 6. Mud Pit Level 7. Hook Movements Cutting Sampling Interval = 30' and every 10' in all zones of interest Page 1 of 1 Davies, Stephen F (DOA) From: Bill Penrose [bill~fairweather.com] Sent: Wednesday, January 16, 2008 3:58 PM To: Davies, Stephen F (DOA) Subject: Tofkat #1 Directional Program Attachments: Tofkat 1 (P5) report.pdf Steve, Here's the directional drilling plan for Tofkat #1 from the new surface location. Regards, Bill Penrose Vice President !Drilling Manager Fairvveather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 1/17/2008 Brooks Range Petroleum Corporation Tofkat 1 (P giant: Brooks Range Petrdeum Reld: North Slope &ooks Range Structurelslot: Totkat 11Tofkat 1 ~~~~I~ wall: Tofkat 1 Borehde: Tofkat 1 UWIIAPI#: 50 Survey Name 1 Date: Tofkat 1 (P5) /January 16, 2008 Tort 1 AHD 1 DDI 1 ERD redo: 59.602° / 10820.14 ft / 6.047 / 1.320 Grid Coordinate system: NAD27 Alaska State Planes, Zone 04, US Feet Locatlon LatlLong: N 70.23005176, W 150.78908358 Locatlon Grid NIE YIX: N 5934319.630 ftUS, E 402239.090 ftUS GridComsrgarceAngls: -0.74257904° Proposal Schlumberger Survey l DLS Computatlon Method: Minimum Curvature / Lubinski Vertical Satdion Azimuth: 248.420° ~ VeAfeW Sectlon Origin: N 0.000 ft, E O.OCO ft ~ 'On TVD Reference Datum: Rdary Table TVD Ra/eroncs Elevation: 50.70 ft relaiive to MSL Sea Bed 1 Groom! Level Elevation: 18.20 ft relative to MSL ~ Magnstlc Dedirratlon: 22254° Total Rsld Strength: 57576.440 nT M~nstk Dlp: 80.636° Dsdinatlon Dad: March 16, 2008 Magnetie Declinatlon Nodal: BGGM 2007 North Reference: True Narth Total CorrMag North •> True North: +22.254° • Comments Measured Inclimtfon AzimuM Sub•SsaTVD TyD Vertical N8 EW MaglGrav DLS Directional Nortiing Easting Latltude Longitude ~~ Sectlon Tool Face DHficully OTG ft A M d n nn A f~ In ft CA 7n ft n M ft n M ft n M ft n nn d 1~ ft w ww Index w ww ftU8 ~ww -w~ w ww ftUS ............... ...w wwwww. ~~ .... ~~ ~~~~~~~~ . ~ ~ ...~,.. v.w «.~~ -gin,. r ~ v.w v.w v.w v.w --- v.w u.w ax~w r~.e~ gv~esy.uy rv r~.~suwi ro w ~ au. iaaaxss~ts KOP Bid 1.51100 500.00 0.00 248.42 449.30 500.00 0.00 0.00 0.00 248.42M 0.00 0.00 5934319.63 402239.09 N 70.23005176 W 150.78908358 Bld 2.5/100 600.00 1.50 248.42 549.29 599.99 1.31 -0.48 -1.22 248.42M 1.50 0.29 5934319.16 402237.87 N 70.23005044 W 150.78909340 700.00 4.00 248.42 649.17 699.87 6.11 -2.25 -5.68 248.42M 2.50 1.39 5934317.46 402233.38 N 70.23004562 W 150.78912941 800.00 6.50 248.42 748.74 T99.44 15.26 -5.61 -14.19 HS 2.50 2.00 5934314.20 402224.83 N 70.23003643 W 150.78919807 900.00 9.00 248.42 847.82 898.52 28.74 -10.57 -26.73 HS 2.50 2.41 5934309.41 402212.23 N 70.23002288 W 150.78829927 1000.00 11.50 248.42 946.21 996.91 46.53 -17.11 -43.27 HS 2.50 2.73 5934303.08 402195.60 N 70.23000500 W 150.78943280 1100.00 14.00 248.42 1043.74 1094.44 68.60 -25.23 -63.79 HS 2.50 2.98 5934295.23 402174.98 N 70.22998283 W 150.78959842 1200.00 16.50 248.42 1140.21 1190.91 94.90 -34.90 -88.25 HS 2.50 3.20 5934285.88 402150.40 N 70.22995641 W 150.78979581 Base Perm 1240.88 17.52 248.42 9179.30 1230.00 106.86 -39.30 -99.37 HS 2.50 3 28 5934281.63 402139.23 N 70.22994439 W 150.78988556 W Sak 1282.95 18.57 248.42 1219.30 127Q:00 119.89 -44.09 -111.49 HS 2.50 3.35 5934276.99 402127.05 N 70.22993130 W 150.7 8 1300.00 19.00 248.42 1235.44 1286.14 125.39 -46.11 -116.60 HS 2.50 3.38 5934275.04 402121.91 N 70.22992578 W 150.7 1400.00 21.50 248.42 1329.25 1379.95 159.99 -58.84 -148.78 HS 2.50 3.54 5934262.73 402089.57 N 70.22989101 W 150.79028433 1500.00 24.00 248.42 1421.47 1472.17 188.66 -73.06 -184.74 HS 2.50 3.69 5934248.98 402053.43 N 70.22985216 W 150.79057452 1600.00 26.50 248.42 1511.91 1562.61 241.32 -88.75 -224.41 HS 2.50 3.82 5934233.81 402013.57 N 70.22980930 W 150.79089463 1700.00 29.00 248.42 1600.40 1651.10 287.87 -105.87 -267.70 HS 2.50 3.93 5934217.25 401970.06 N 70.22976252 W 150.79124404 1800.00 31.50 248.42 1686.77 1737.47 338.25 -124.39 -314.54 H5 2.50 4.04 5934199.34 401922.99 N 70.22971191 W 150.79162208 1900.00 34.00 248.42 1770.87 1821.57 392.34 -144.28 -364.85 HS 2.50 4.14 5934180.10 401872.44 N 70.22965755 W 150.79202803 2000.00 36.50 248.42 1852.53 1903.23 450.05 -165.51 -418.51 HS 2.50 4.24 5934159.58 401818.51 N 70.22959957 W 150.79246113 2100.00 39.00 248.42 1931.59 1982.29 511.27 -188.02 -475.44 HS 2.50 4.32 5934137.80 401761.30 N 70.22953806 W 150.79292054 2200.00 41.50 248.42 2007.91 2058.61 575.87 -211.78 -535.52 HS 2.50 4.41 5934114.83 401700.92 N 70.22947314 W 150.79340539 2300.00 44.00 248.42 2081.34 2132.04 643.75 -236.74 -598.64 HS 2.50 4.49 5934090.69 401637.49 N 70.22940493 W 150.79391476 We1lDesign Ver SP 2.1 Bkl( doc40x 100) Tofkat 11Tofkat 1\Tofkat 1\Tofkat 1 (P5) Generated 1/16/2008 2:32 PM Page 1 of 2 Comments Measured Incllnatlon Aamuth Sub-SeaTVD Tw Vertlcal N8 EW MaglGrav DLS DlracHonal NoMlnp Easdrg t.atitude Lonpituda ~~ Ssctlon TooiFace ~ftieulty ft d d ft ft ft ft ft d 1~ ft Indaac tN8 tU1S L4W.W 40.VV L40.4L 6171./) GLVL.4J / I4./O -LOL.0.7 -004.0/ r7J L..7V 4..'70 .7`734V0.7.43 4V 1.7/ 1.13 IV /U.LCJ333.7/ W l~V./y444 /00 2500.00 49.00 248.42 2218.96 2269.66 788.78 -290.07 -733.50 HS 2.50 4.63 5934039.11 401501.96 N 70.22925919 W 150.79500313 2600.00 51.50 248.42 2282.90 2333.60 865.66 -318.35 -804.99 HS 2.50 4.70 5934011.77 401430.11 N 70.22918193 W 150.79558005 2700.00 54.00 248.42 2343.43 2394.13 945.25 -347.62 -879.01 HS 2.50 4.76 5933983.47 401355.73 N 70.22910195 W 150.79617735 2800.00 56.50 248.42 2400.42 2451.12 1027.41 -377.83 -955.41 HS 2.50 4.82 5933954.25 401278.95 N 70.22901938 W 150.79679389 2900.00 59.00 248.42 2453.78 2504.48 1111.97 -408.93 -1034.05 HS 2.50 4.88 5933924.17 401199.92 N 70.22893439 W 150.79742849 End Bld 2924.06 59.60 248.42 2486.06 2516.76 1132.67 -416.54 -1053,29 - 2.50 4.89 5933916.81 401180.58 N 70.22891359 W 150.79758377 K-5 3207.13 59.60 248.42 2609.E 2660.00 1376.82 -506.33 -1280.34 -- 0.00 5.00 5933829.98 400952.41 N 70.22866820 W 150.79941593 9-5/8" Csg Pt 3879.06 59.60 248.42 2949.30 3000.00 1956.38 -719.46 -1819 28 -- 0.00 5.98 5933623.87 400410.80 N 70.22808564 W 150.80376478 Topset 3 5993.64 5960 248.42 4019.30 4070.00 3780.26 -1390.19 -3515 36 - 0.00 5.52 5932975.24 398706.33 N 70.22625160 W 150.81 3 HRZ f 1191.18 5960 248.42 6649.30 6700.00 8263.28 -3038.82 -7684.23 - 0.00 592 5931380.93 3945f6.82 N 70.22173920 W 150.85 9 Kal~7ik 11546.90 5960 248.42 6829.30 6880.00 8570. f0 -3151.65 -796955 -- 0.00 5.93 5931271.81 394230.09 N70.22143014 W f50.8533 529 Target 1 LCU 11803.81 59.60 248.42 6559.30 7010.00 8791.70 -3233.14 -8175.62 - 0.00 5.95 5931193.00 394023.00 N 70.22120691 W 150.85503695 Target 2 Alpine C 13760.30 59.60 248.42 7949.30 8000.00 10478.22 -3853.73 -9744.89 -- 0.00 6.03 5930592.86 392445.97 N 70.21950642 W 150.86768989 TD / T' Csg 14155.55 59.60 248.42 8149.30 8200.00 10820.14 -3979.10 -10061.92 -- 0.00 6.05 5930471.62 392127.37 N 70.21916278 W 150.87024578 Legal Description: Northi ng (1~ [ftUS] Easting (X) [ftUS] Surface : 661 FSL 1808 FEL S71 T10N R5E UM ~ 5934319.63 402239.09 Target 1 LCU : 2704 FSL 4707 FEL S15 T1 ON RSE UM / 5931193.00 394023.00 Target 2 Alpine C : 2082 FSL 997 FEL S16 T10N RSE UM 5930592.86 392445.97 BHL : 1956 FSL 131 4 FEL S16 T10N R5E UM 5930471.62 392127.37 • WeliDesign Ver SP 2.1 Bid(doc40x 100) Tofkat 1\Tofkat 1 \Tofkat 1 \Tofkat 1 (P5) Generated 1116J2008 2:32 PM Page 2 of 2 Brooks Range Petroleum Corporation Schlumberger ~LL Tofkat 1 (P5) FIEF North Slope Brooks Range STRUCTURE Tofkat 1 Magnetic PararreRrs Sunc~e LOrelbn NAD21 Alaska State Planes. lox g4, US Feet M~adaneous Motlet BGGM 1861 Dq: 66838° Dale: Marty tfi, 1666 LM N161348.1 BB Northing: 583431663 M15 Grkl Ceres. ,614]51864' Sbt TNlvgt NOI~F Rabry Table (56.16ft above MSL~ M ag Dec *]2.254° FS: 515]64 nT Lon. 'M 5641 16181 EasDng: 482g3B 8811135 Scale Fa¢68888188568 Plan: Tofkat 11P5) Srvy Wte January lfi, 7686 0 1500 3000 4500 6000 7500 9000 10500 0 0 • 1500 3000 ~x S C 11 d c~ 4500 6000 7500 O-SB- Csg Pt . .._ ~ _ _ ._.. _.._.._ _.. _.. _.. .. -..~.._.._.._..~...e............._.._.._..~..~.._.._.._.._..-.. _.. _.. _.. r.. ~..~.. _.. _.._ .__._. _. _ _ 1500 30~ 4500 6000 7500 0 1500 3000 4500 6000 7500 9000 10500 Vertical Section (ft) Azim = 248.42°, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-V Brooks Range Petroleum Corporation Schlumherger `~`~ Tofkat 1 (P5) F,ELG North Slope Brooks Range ~`]"`~ Tofkat 1 MaBneOC Pxan2lers SWace LOfd11011 NA02]Alaska Slak Planas.Zwrc 04, US Feet Misallarrtous Matlel BGGM 200] Ob' 80.838° ONe: Man:~18, 2008 LM N]01348.IB8 NaRM1irq: 593431983 ftUS GMCOm. -01425]904° Sla[ To0mt1 TVO ReI: RoWyTMNe~50. ]ORabwe MSL) M ag Oec a22.254° FS'. St5]84nT Lon: WI504]20.]Ot EesGng 4022300811US Scale FaG 0.9988108589 Plan to8otl (P5) Srvy Lb[e: January 18, 2008 Q n n A Z ms's N C 11 Gi V V V _A AlN1 • -1200 -0800 -9600 -8400 -7200 -6000 X800 -3600 -2400 -1200 0 «< W Scale=l(in):1200(ft) E »> iy~^~~"~ Brooks Range Petroleum a subsidiary ofAVCG, LLC 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 December 14, 2007 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Application for Permit to Drill: Tofkat #1 Dear Mr. Norman, ~,~~ ~~, ~ ~~~7 ~iaxke C)ia was O~t:A, (~,,~3i~tiasa~- Brooks Range Petroleum hereby applies for a Permit to Drill an oil exploration well from an ice pad east of the Colville River opposite the village of Nuiqsut on the North Slope. Brooks Range plans to use Nabors Rig #27-E to drill this well. The Tofkat #1 will be directionally drilled to the west into a suspected hydrocarbon accumulation beneath and to the west of the Colville River. ~~v~~~~ If the well proves sufficiently promising once TD is reached, it will be plugged back and `~ ~w~©r .~. a sidetrack delineation well drilled. If the well proves a disappointment, it will be ~(i,~ ~~~ permanently plugged and abandoned without a delineation sidetrack. Neither of these ~~,,,,wwnn scenarios involves running production casing and testing this initial well. `'~v1 ~ (~1 The wellsite will be accessed via a +1/2 mile spur ice road off ConocoPhillips' planned Alpine ice road, the use of which Brooks Range has entered into an agreement with ConocoPhillips. Please find attached the following information as required by 20 AAC 25.005 (a) and (c) for your review: 1) Form 10-401 Application for Permit to Drill 2) A plat showing the surface location of the well 3) Summary drilling program 4) Drilling Time versus Depth Plot 5) Proposed Wellbore Diagram 6) Geo-Mechanical Plot 7) Pressure Calculations, Drilling Area Risks and Waste Disposal 8) Casing Properties and Design Factors 9) Diagrams and Descriptions of the BOP Equipment to be Used ORIGINAL • 10) Directional Drilling Program 11) Drilling Fluid Program 12) Cementing Program The following are Brooks Range's designated contacts for reporting responsibilities to the Commission: 1) Completion Report Bill Penrose, Drilling Manager (20 AAC 25.070) (907) 258-3446 2) Geologic Data and Logs Doug Hastings, VP -Exploration (20 AAC 25.071) (907) 865-5802 If you have any questions or require additional information, please contact me at (907) 865-5840 or Bill Penrose at (907) 258-3446. Sincerely, KS RANGE PETROLEUM CORPORATION Bart Armfield Vice President - enclosures cc: Bill Penrose -Fairweather 2 STATE OF ALASKA AL~ OIL AND GAS CONSERVATION CO ~~ SION PERMIT TO DRILL 20 AAC 25.005 ~~~ '~ ~ is 1 4 207 1 a. Type of Wor Drill ^ Redrill Re-entry ^ 1 b. Current Well Class: Exploratory Q Stratigraphic Test ^ Service ^ Multiple Zone ^ Development Oil ^ Development Gas ^ Single Zone ^ 10. Sp ify if well is proposed fo{: C Ibed Methane ^ Gas HyH ates ^ Shale Gas ^ 2. Operator Name: Brooks Ran Petroleum Corporation 5. Bond: Blanket 0 Single Well ^ Bond No. LPM 88421 11. Well Name and Number: Tofkat #1 3. Address: 510 L Street, Suit 601, nchorage, AK, 99501 6. Proposed Depth: MD: 13,630' TVD: 8,200' 12. Field/Pool(s): 4a. Location of Well (Governmental Se n): Surface: 442'FSL 2221'FEL S11 T10N- E 7. Property Design on: OL39D6 ~6, DL 391013~~L,~~~'S Exploratory Top of Productive Horizon: 2704'FSL 470TFEL S15 T10N-R5E 8. Land Use Pe it: ~~ N/A 13. Appproximate Spud Date: ~ `f`S/ 0 ~ 1 Total Depth: 2012' FSL 1204'FEL S16 T10N-R5E 9. Acres in operty: ~c~ 2560 14. Distanc o Nearest Property: 518' ;~ 4b. Location of Well (State Base Plane Coord~ ates~ ASP N27 Surface: x-40 '~~«3 y- 5,934,~7~ Zo -4 10. KB evation (Heig above GL): 32.5 feet 15. Distance to Nearest Well 1AFit#~++rPeeF: 4.1 miles 16. Deviated wells: /~• Kickoff dept : tz • a9° 500 fe Maximum Hole Angle: 58.02 degre 17. aximum Anticipated Pressures ' (see 20 AAC 25.035) D Whole: ?24;t-Psi~,3'1~ .56 rface: 3,447 psi 18. Casing Program: Specifications To p -Setting Depth -Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 16" 80' 80' 80' Grouted to surface 12-1/4" 9-5/8" 40# L-80 BTC 3,8 0 3,832' 3,000' _ 1201 cu ft to surf. + 150% XS 19. PRESENT WELL CONDITION SU ARY (To be completed for Redri nd Re-Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs easured): Effect. Depth M ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Filing Fee ~ BOP Sketch 0 Drilling Program ~ Time v. Depth Plot Q S Ilow Hazard Analysis ^ Property Plat Diverter Sketch ^ Seabed Report ^ Drilling Fluid Program Q 20 AAC 050 requirements ^ 21. Verbal Approval: Commission epresentative: 22. I hereby certify that the foreg ' g is true and correct. Printed N Bart Armfield Signature Date Contact gill Penro 258-3446 Title Vice President -Operations Phone 865-5840 Date ' Z ~l.C Commission Use Only Permit to Drill r Number: v~~7?/~c~ ~ API ber: ~ 9~33~/D DD Permit Approval Date: See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained ins les: Other: CRSE~ED Samples req'd: YesO No^ Mud log req'd: Yes No^ Supt v7 G H2S measures: YesO No^ Directional svy req'd: Yes No^ APPROVED BY THE COMMISSION DATE: ,COMMISSIONER Form 10-401 Revised 12/2005 U R I ~ ~ ~~ ~ Submit in Duplicate ~~ ARE APPROXIMATE ORIGINAL SUBMISSION DATE: 09-25-07 SCALE: 1" = 200' SHEET: 1 OF 1 REV °"7E DESCRIP710N REV DAiE DESCRIPTION 1 0/22/0 wEU. NaeE CwnCE NOTES. Barrow PROJECT /~ ,~„ AREA 1 BEAUFORT SEA 1. COORDINA S SHOWN HEREON, BASED UPON GPS OBSERVATIONS UMMER 2007), ALASKA STATE PLANE 2. VERTICAL DATU SL (GEOID 2006, ALASKA) 3. ALL DISTANCES AND EVATIONS ARE IN SURVEY FEET 4. FIELD SURVEY 5. SECTION LINES SHOWN HI AND FOR REFERENCE ONLY AS-STAKED " v~ i , ~~ ~ o ,,.•~ ~~ a w m ~~ 84 Sg. \?76. 423 \ \ h~ 09-12-07 ~°~,~ ,o /~ a .h~~ ry h _ /~ P i Kaktovik N Iqsut• Deadhorse ' f ~ ll r~ ~ i 9,,~± ;a' ~+ ~' ~ ~ ~ I ~- ~~ _ f~ 'J iy _~ ~ PAD ~" ~~ _~ I~ ~ ` I I: ICINITY MAP -NOT TO SCALE FKAT 1'yWELL - "TOFKAT 1" WELL ~ s ~'' +I u ~ ~~. "7 ~ G0 -~. e~ s~a„ ~~ r~ptl CV Z o~o ~ ~ o goo zoo w w NIA SCALE IN FEET 1 " = 200' ~ I ~ W I W ~V ~ z $ oIo I- I I- I ICE PAO SHOWN FOR REFERENCE ONLY -~/` 2178'± ---~ T 10 N, R 5 E, UM SECTION 11 ,~-~~~``\~~ OF A~ ~~~ - -~ - -~~ ....... qs i T 10 N, R 5 E, UM SECTION 14 ~,`P, • ' ,~ SURVEYORS CERTIFICATE / *. 4Q TH ~.. .. / ... 1 HEREBY CERTIFY THAT I AM PROPERLY RE TERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE O~Z~ ~ ,. ~ D RECT SUPERVISION AND THAT All DIME IONSHAND OT ER DETAI S ARE ORRE T AS OF SEPTEMBER 2007 I ~•• KENNETH J. PINARD ••'~ ~ I+ `~~1. No. 11545 .•~~~~ ,It~~~pR~fESSIONA~~P~~-~ ~ J ~ an Ukpeegvik Inupiat Corporation Company BROOKS RANGE PETROLEUM DRAWN BY: LHH CHECKED BY: KJP W.O. No: 2007-217 LEGEND ® WELL-SET REBAR W/CROSS LATH ~ RP-SET REBAR W/CROSS LATH Q PIPELINE ANGLE BY FOUND ALUM. CAP "TOFKAT 1" WELL LOCATED WITHIN T. 10 N., R. 5 E., U.M., SECTION 11 ,/` NAD 27, ZONE 4* LAT: 70°13'46.793" N LONG: 150°47'31.570" W N = 5,934,182.9 E = 401,863.2 / NAD 83, ZONE 4 LAT: 70°13'45.619" N LONG: 150°47'42.762" W N = 5,933,931.0 E = 1,541,897.5 ElE = 18.2' MSL CONVE D FROM NAD 83 B DCOM Brooks Range Petroleum Cor~tion Tofkat #1 Summary Drilling Procedure 1. Prior to moving in drilling rig, excavate and install cellar then drill 16" conductor to 80' below ground level. 2. Move in, rig up Nabors Rig # 27E. Notify AOGCC of intention to spud. Rig up diverter on 16" conductor and function test. Rig up mud loggers. 3. M/U 12-1/4" drilling assembly with PDM, MWD and LWD tools and drill vertically to 500'. Kick off at +500' and directionally drill hole to ±3,833' MD / 3,000' TVD. 4. Run 9-5/8", 40#, L-80, BTC surface casing and cement to surface per cementing program. WOC. 5. Install wellhead, land casing, N/iJ SK WP BOPE and test to 5000 psi. 6. M/U 8-1/2" drilling assembly with PDM, MWD and LWD tools. 7. RIH with 8-1/2" directional drilling assembly, clean out to float collar and test 9-5/8" casing to 3,000 psi. Drill out float collar, cement, float shoe and 20' of new hole. Conduct leak-off test. Convert to oil base mud system. w~~+~~v~.~1r~ ~~ 8. Dri118-1/2" directional hole as specified in directional program to TD at ~~`,~ 13,630'TD/ 8,200' TVD. 9. Condition the hole and POH and run open-hole logs. ~~ ~~~ r.~Cc~c..J~ ~1c1 10. At the conclusion of logging, plug back the open hole with cement, isolating hydrocarbon-bearing intervals per AOGCC regulations and drill the Tofkat #lA sidetrack from the shoe of the 9-5/8" casing. Tofkat #1 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 a 6000 ~ 6500 ~ 7000 7500 ~ 8000 ~ 8500 9000 9500 10000 10500 11000 11500 12000 12500 13000 13500 14000 14500 Il: ~. AA.... /f'1: 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Days Brooks Range Petroleum Corporation Tofkat #1 Wellbore Schematic 12-1/4" hole 8-1/2" hole 16" conductor at 100' 9-5/8" casing at 3,000'TVD, 3,833'MD LCU at 7,010' TVD, 11,407'MD Alpine C at 8,000'TVD, 13,276'MD TD at 8,200' TVD, 13,630'MD WJP 12/13/07 s • Tofkat #1 Geo-mechanical Plot 0- 1,000 2, 000 3, 000 ~ 4, 000 s a m D 5, 000 m m ~ 6,000 7,000 8,000 9,000 10, 000 16~~ I P rmafro t _._._ _._. _._._ ._._. _ _. Min r~rav_ Is._._. ._._ _.ba a a~ 1 230'._. -.-.- -.-. -.-.- -._._. _ nea sur~;c ay ._ _._. ._._ ._._. _._._ Frac G ad. stic ing to it and BHA I I ~ est S k --~- --~ --- --- -~--~ -- -~- I -__ i __~ __ ~_~_ -~__ S ale W II I (K-5) ud We ght ( ore Pr ss. + ~ ~ tilling argin) ~ opset I ~ _._._. ._._. _._ ._._. _. - - -~- - -~- - - - - - - -H ~ - -~- - _._._ _._. _._ _ ~ _.~ ._. O . cassio al tigh _._._. _._._ t _. _._._ ho e, ledg sand pa king o - ~- - -~ p ne TD I i i 8 10 12 14 16 18 Mud Wt. in ppg Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation Pressure Calculations, Drilling Area Risks and Waste Disposal Tofkat #1 Maximum Anticipated Surface Pressure: 8-1/2" Hole Section The maximum anticipated surface pressure (HASP) for the 8-1/2" hole section will be the formation pore pressure at the well's TD of 8,200' TVD less a full gas column to the surface. Offsetting well information indicates that the pore pressure at TVD will be a maximum of 10.2 ppg (or 0.5304 psi/ft). / Calculation: HASP (pore pressure) _ (8,200 ft) (0.5304-0.11) = 3,447 psi ~ With HASP for this well to be 3,447 psi, the 5,000 psi BOPE system is appropriately rated. Well Proximity Risks: The closest wellbore to Tofkat #1 is the Oberon #llocated approximately 4.1 miles away. There is thus no anticipated interference expected between wellbores. Drilling Area Risks: Hydrates: There is a remote possibility of encountering with gas hydrates. If this does , j occur, it will be addressed via control drilling, increased mud weight and additions of lecithin. Hydrogen Sulfide: The Tofkat #1 well will be drilled in the midst of a relatively densely-explored and developed province that has proved to be free of significant pre- development H2S down through the planned TD of this well. The Alpine field is immediately to the north, the Kuparuk River field is nearby to the east and quite a few exploratory wells have been drilled all around the location of the proposed well. See the attached map. i ~- The Tofkat #1 will test the Kuparuk River Formation and the Jurassic Alpine C Formation which are produced in the Kuparuk River field and the Alpine field, respectively, without original H2S. Further, most of the nearby exploratory wells drilled in the past penetrated these intervals with no noted H2S present. ~ As a standard precaution, the drilling rig and mud logging units will have functioning H2S detectors and the rig and camp will have emergency breathing apparatus for ~' evacuation, rescue and well shut-in contingencies. Disposal of Muds and Cuttings: All drill cuttings and waste drilling fluid will be disposed of at BP's grind and inject - facility at Prudhoe Bay or in ConocoPhillips' Class II disposal wells in the Kuparuk Field. Brooks Range Petroleum Corporation Tofkat #1 Casing Properties and Design Verification Casing Performance Prpoerties Size Weight (in) (Ib/ft) 9-5/8" 40# Grade Cnxn L-80 BTC-M Internal Collapse Tensile Strength Yield Resistance Joint Body TVD MD (psi) (psi) (1000 Ibs) (1000 Ibs) (ft RKB) (ft RKB) 5,750 3,090 979 916 3,000 3,833 Design Safety Factors* T B C 7.0 1.6 2.6 * Design factor calculations are based on the following: Tensile design safety factore are calculated using pipe weight less buoyancy. Burst design safety factors are calculated at the surface using zero backup on the outside and MASP on the inside. Collapse design safety factors are calculated at the casing shoe using maximum expected mud weight to be used at the shoe depth on the outside and the entire cased hole evacuated except for a gas gradient on the inside. Casing Setting Depth Rationale 9-5/8" 3,833' MD/ 3,000' TVD Surface casing to stablize shallow formations, provide an anchor for the BOP stack and provide shoe strength in the event of kick. Brooks Range Petroleum Corporation Tofkat No. 1 Casing Design Safety Factors Burst Check for 9-5/8", 40 #, L-80, BTC surface casine: Max. Pressure at surface =((10.2 ppg x 0.052)-0.11) x 8,200' = 3447 psi DFb =burst strength /burst stress = 5,750 psi / 3,447psi =1.6 Collapse Check for 9-5/8", 40 #, L-80, BTC surface casine Design criteria are based on a 9.6 ppg EMW pore pressure external to the casing at the shoe and a gas gradient inside the casing: External pore pressure = 9.6 x 0.052 x 3,000' Internal pressure w/gas only = 0.11 x 3,000' Collapse stress = 1,498 psi - 330 psi = 1,168 psi DFc =collapse rating /collapse stress = 3,090 / 1,168 Tension Check for 9-5/8", 40 #, L-80, surface casine: Weight t in air = 3,833' x 40 lb/ft Buoyed weight = 153,320 # x 0.8533 (buoyancy factor) =1,498 psi = 330 psi = 2.6 = 153,320 # = 130,828 # DFt =joint tensile strength /buoyed wt = 916,000 / 130,828 = 7.0 4' 3 7/B' 7/8' _-___-___-___-_-_-_-_- z' B i/e• 2' 8 1/B• 3 5000E GATE VALVE - 3ro. 3• SOOOr HCR VALVE^ _ i' Io s/e• _ 3/B• -_ 1 - ~ 3•z2• 2' KILL LI 2' 8 I/8' 3/B' - -------------- o' to T/B• CUSTOMER FURNISHED BOLTED FIANCE ADAPR72 SPoOL - HUB z FLANGE -2I I/a• 2000e HrDRa BoP/DrvERFER / RG SURFACE DIVERTER PIPING CONFIGURATION PLAN VIEW SURFACE DIVERTER CONFIGURATION 11 5/8' 5000/ HYDRIL ANNULAR BOP BOLTED FIANCE SINGLE 1} 5/8' 5000 HYORII MPL PPE RAM BOLTED FIANCE SINGLE /3 5/B• 5000/ HYDRIL MPL BLRdD RAM ~ BOLTED FIANCE a' 5000/ HCR VALVE \ III 4• CHOKE LINE 4. 5000/ GATE VALVE ~ BOLTED FLANGE ~F' SINGLE 13 5/e' 5000/ HYDRA MPl PIPE RAM GATE 1CTUATOR MCOIHD) gVERIFR BIZE (167 / CONHOWNIpN crrtNCm uANP caxrAxctaN ro Bourn nABCI RLVtsm gAmIFA .s PER ocN N '',,11__-- NoBon AIoYm q B~~ 2525 C Shale, AIMBOBBIOIrIBOy~ Mchotoga, AkeN 807-283-BWO °IX'T RIG 27E ' BOP STACK AND SURFACE DIVERTER H:\ACADFILE\27E\BOP\27E0301C.DWG, 12/07/01 01:02:51 PM oo/oVB3 A ToE u cnaElu~. rsuE M1E RWV. OvNt1 IHII. OESCRifION BOP STACK ELEVATION Brooks Range Petroleum Corporation Schlumberger '~ Tofkat 1 (P41 Proposal R Date: December 13, 2007 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski C Brooks Range Petroleum Vertical Section Azimuth: 250.000° Field: I Slot: Stnret Slope Brooks Range ^ Toflca ofkat 1 ^ I Vertical Section Origin: Iona TVD Reference Datum: N 0.000 ft, E 0.000 ft Rotary Table ~re ^ ^ ec D ~ ',Y(!ell: Borehote:, ' Tofkat 1 a~;~'ll~ Tofkat 1 TVD Reference Elevation: Sea Bed I Ground Level Elevation: 50.70 ft relative to MSL 18.20 ft relative to MSL , UWIIAPI#: 50 Magnetic Declination: 22.301 ° Survey Name I Date: Tofkat 1 (P4) I February 13, 2 Total Field Strength: 57574.009 nT ToR 1 AHD 1 DDI 1 ERD ratio: 57.942° / 10205.39 ft / 5.992 / 1.245 Magnetic Dip: 80.634° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US / Declination Date: February 13, 2008 Location LaULOng: N 70.22897670, W 150.79207643 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5933931.000 ftUS, E 401863.200 ftUS Nolth Reference: True North Grid Convergence Angle: -0.74539052° Total Corr Mag North •> True North: +22.301 ° Grid Scale Factor. 0.99991094 Local Coordinates Referenced To: Well Head ~6. ~~ • a~ S~ Comments Measured Inclination Azimuth Sub•SeaTVD TVD Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty fl de de fl ft k ft ft d de 100 ft Index ftUS ftUS Klt KOP Bld 1.5/100 Bld 2.5/100 Base Perm W Sak U.UU U.UU LOU.VU 500.00 0.00 250.00 600.00 1.50 250.00 700.00 4.00 250.00 800.00 6.50 250.00 900.00 9.00 250.00 1000.00 11.50 250.00 1100.00 14.00 250.00 1200.00 16.50 250.00 1240.88 17.52 250.00 1282.95 18.57 250.00 1300.00 19.00 250.00 1400.00 21.50 250.00 1500.00 24.00 250.00 1600.00 26.50 250.00 1700.00 1800.00 1900.00 2000.00 2100.00 2200.00 29.00 250.0 31.50 25 34.00 0.00 36.50 250.00 39 250.00 41.50 250.00 44.00 250.00 -UU./V V.VV V.VV V.vv v.VV --- .vv .ia.i.i~.i ~. ,v ~a~vv.cv ~. ~v.«...., ... .. .. •........~.....-... 449.30 500.00 0.00 0.00 0.00 5 . 0.00 0.00 5933931.00 401863.20 N 70.22897670 W 150.79207643 549.29 599.99 1.31 -0.45 -1 250.00 1.50 0.29 5933930.57 401861.96 N 70.22897547 W 150.79208635 649.17 699.87 6.11 -2.09 .74 250.OOM .50 1.39 5933928.99 401857.44 N 70.22897099 W 150.79212274 748.74 799.44 15.26 -5.22 -14.34 HS 2. 2.00 5933925.97 401848.80 N 70.22896244 W 150.79219212 847.82 898.52 28.74 3 -27.01 HS 2.50 5933921.52 401836.07 N 70.22894985 W 150.79229438 946.21 996.91 46.53 -15.91 -43.73 HS 2.50 2.73 933915.66 401819.27 N 70.22893322 W 150.79242931 1043.74 1094.44 68.6 -23.46 -64.46 HS 2.50 2.98 5 8.38 401798.44 N 70.22891261 W 150.79259667 1140.21 1190.91 9 -32.45 -89.18 HS 2.50 3.20 59338 401773.61 N 70.22888804 W 150.79279612 1179.30 1230.00 .86 -36.54 -100.42 HS 2.50 3.28 5933895.77 01762.32 N 70.22887686 W 150.79288681 1219.30 1270. 119.89 -41.00 -112.67 HS 2.50 3.35 5933891.47 4017 N 70.22886469 W 150.7929 1235.44 1 .14 125.39 -42.88 -117.83 HS 2.50 3.38 5933889.66 401744.84 70.22885956 W 150.79302 1329.25 379.95 159.99 -54.71 -150.35 HS 2.50 3.54 5933878.25 401712.17 2882722 W 1.50.79328976 1421. 1472.17 198.66 -67.93 -186.69 HS 2.50 3.69 5933865.51 401675.66 N 70. 110 W 150.79358300 15 1 1562.61 241.32 -82.52 -226.77 HS 2.50 3.82 5933851.44 401635.40 N 70.22875 W 150.79390646 1600.40 1651.10 287.87 -98.44 -270.52 HS 2.50 3.93 5933836.10 401591.45 N 70.22870775 W 150.79425953 1686.77 1737.47 338.25 -115.67 -317.86 HS 2.50 4.04 5933819.49 401543.89 N 70.22866068 W 150.79464153 1770.87 1821.57 392.34 -134.16 -368.69 HS 2.50 4.14 5933801.66 401492.83 N 70.22861014 W 150.79505174 1852.53 1903.23 450.05 -153.90 -422.92 HS 2.50 4.24 5933782.63 401438.35 N 70.22855622 W 150.79548937 1931.59 1982.29 511.27 -174.83 -480.45 HS 2.50 4.32 5933762.45 401380.56 N 70.22849903 W 150.79595360 2007.91 2058.61 575.87 -196.92 -541.16 HS 2.50 4.41 5933741.15 401319.57 N 70.22843866 W 150.79644353 2081.34 2132.04 643.75 -220.13 -604.94 HS 2.50 4.49 5933718.77 401255.50 N 70.22837524 W 150.79695824 WeIID~n Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1\Toflcat 1 (P4) Generated 12/13/2007 11:23 AM Page 1 of 2 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical NS EW Mag I Grav DLS Directional Northing Easting Latitude ongitude Depth Section Tool Face Difficulty ff d de ff ff ff fl ff de de 1100 ff Index ffUS ftUS __ __ _ uo o ~n ~ cc m~~c~a ac ena~cc n~ ni ~n ~~a an ~ni ~~n ~o~eaa~e Z4UU.UU 4b.OV [~U.VV ci oi.i~ ccvc.4o / 14./0 -L4'4.9L -VI IA! Iw ~..+~ - ~ ~~~ ~~~~~~ ~~ ~~• """ -• ~"°~•"• •""• 2500.00 49.00 250.00 2218.96 2269.66 788.78 -269.73 -741.23 HS 2.50 4.63 5933670.96 401118.59 N 70 23972 W 150.79805801 2600.00 51.50 250.00 2282.90 2333.60 865.66 -296.02 -813.47 HS 2.50 4.70 5933645.62 401046.02 .22816788 W 150.79864098 270. 54.00 250.00 2343.43 2394.13 945.25 -323.23 -888.27 HS 2.50 4.76 5933619.38 40097 N 70.22809350 W 150.79924455 2800.00 56.50 250.00 2400.42 2451.12 1027.41 -351.33 -965.47 HS 2.50 4.82 5933592.29 40 .33 N 70.22801672 W 150.79986755 End Bld 2857.67 .94 250.00 2431.64 2482.34 1075.89 -367.91 -1011.04 --- 2.50 4.86 5933576.31 847.56 N 70.22797141 W 150.80023521 K-5 3192.38 5 . 250.00 2609.30 2660.00 1359.56 -464.91 -1277.60 -- 0.00 4.98 5933482.79 400579.77 N 70.22770630 W 150.80238621 9-5/8" Csg Pt 3832.94 57.94 50.00 2949.30 3000.00 1902.45 -650.55 -1787.76 --- 0.00 5.15 5933303 400067.29 N 70.22719885 W 150.80650264 Topset 3 5848.84 57.94 250. 4019.30 4070.00 3610.94 -1234.77 -3393.26 --- 0.00 5.48 740.58 398454.47 N 70.22560129 W 150.81945597 HRZ 10803.80 57.94 250.00 9.30 6700.00 7810.31 -2670.76 -7339.49 --- 0.00 5.86 931356.18 394490.26 N 70.22167059 W 150.851285,E Kalubik 11142.93 57.94 250.00 68 6880.00 8097.72 -2769.04 -7609.57 --- 0.00 5931261.43 394218.95 N 70.22140136 W 150.85346 Target 1 LCU 11387.85 57.94 250.00 6959.3 7010.00 8305.30 -2840.02 -7804.63 --- 0.00 .89 5931193.00 394023.00 N 70.22120690 W 150.85503699 Target 2 Alpine C 13253.02 57.94 250.00 7949.30 .00 9886.05 -3380.56 -9290.09 --- 0.00 5.98 5930671.88 392530.77 N 70.21972558 W 150.86701493 TD / 7" Csg ' 13629.83 57.94 250.00 8149.30 _ 8200.00 205.39 -3489.76 -9590.18 --- .00 5.99 5930566.60 392229.31 N 70.21942623 W 150.86943449 Legal Descriation: No (Y) [ftUS] Easting (X) [ft Surface : 518 FSL 2178 F EL S11 T10N R5E UM 31.00 401 .20 Target 1 LCU : 2322 FNL 4703 FEL S15 T10N R5E UM ,~ 5931 0 023.00 Target 2 Alpine C : 2863 FNL 908 FEL S16 T10N R5E UM 5930671. 392530.77 BHL : 2972 FNL 1208 FEL S16 T10N R5E UM 5930566.60 392229.31 ~`rG.ocH '~~ ~ °~c i~ ~~ WeIlDesign Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Totkat 1\Tofkat 1\Tofkat 1 (P4) Generated 12/13/2007 11:23 AM Page 2 of 2 Brooks Range Petroleum Corporation Schlumberger WELL Tofkat 1 (P4) FIELD North Slope Brooks Range 6TRUCTURE Tofkat 1 Magnetic Parameters 6urlace Location N4D2]Abska 6tate Pbnes.2oire 04. U6 Feef Mizcelbneous Model: aGGM 200] Dip'. 80.634' Date: February 13, 2008 Lat N]013441f6 Nortbirg. 593393100 flU6 GSM CON:-D]d539052' 6bf. ToMait NO ReI: Ropry Table (50.]Oft>bove MSL) MaO Doc: 122.301' F6'. 5]5]40 nT l°n: W1504]31.4]5 Eastl~g: 401863.20 R1A5 6cale Fact. 0.99991094W Pbn: Toflatt (P4J 9rvy Date: February 13. 2009 0 1500 3000 4500 6000 7500 9000 10500 ~ .......................... ~ RTE..................:..................................:..................................:..................................:..................................~...,............................ ............................... ........... 0 OP Bid 1.5/700 BI 100 1500 ...........................;... .............................5............. ..................................................... Enil Bid • 1500 95/S" Csg Pt ' 3000 ...........................:..................................:.....~ .............................................. .........: ..............................:..................................~..................................;..................................,............... 0 wA o v/".w c VId7. ~- .._.._.._.._.._.._..~.._.._.._.._.._.._.._.._..i.._ ~ sel3 ._ - - _.._.._.._.._.._.._ _ ._.._.._. II ' ~ 4500 • .................................:..................... .........;............................. ..,............................ ..~................................ ...... 4500 U ~.... ~ ~~ ~~ ~ ~Q... 6000 ................................. ............................................................ i................................. .............................. ........... .......... ........................... ....... ....... 6000 7arget[I LCU~ .. _.._.._.._.._..j..._.._.._.._.._.._.._.._..t.._.._.._.._.._.._.._.._..t.._.._.._.._.._.._.._.._..t.._.._.._.._.._.._.._.._..t.._.._.. _.. _.. _.._.. _.. _.. ~..-.. _.._ _ _..f.._.._.. _.. _.. _.. _.. _.. _..:..-.. -.._.. lk 500 ~ ........................... .............................. ........ Target 2 Alpine C 7500 fD 17" Csg t 1 (P4) 0 1500 3000 4500 6000 7500 9000 10500 Vertical Section (ft) Azim = 250°, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-V Schlumberger Brooks Range Petroleum Corporation WELL Tofkat 1 (P4) FIELD North Slope Brooks Range 6TRUDTURE Tofkat 1 Magneto etPS 6uRace Lo cation NAD2] Alaska 6tate Planes, Zone 04, U6 Feat Mrscellaneous ] Dip: 80.634' Date: Febuary 13. 2006 MoEel: B UL N]01344.316 NoMi~g: 593393100 RU6 Grd DOnV: A.]4539052' 6bt. Tolkatl P/D Re/: Robry Tale (50.]0 ftebove M6L) Maa Dec'. +22301' F6: 5]5]40nT Lan: W1504]31.4]5 Fasting'. 401863.30flUS 6cab Fact'. 0.9099109406 %an: TaAat1 (P4) 6rry bale'. February 13, 2008 -9600 -8400 -7200 -6000 -4800 -3600 -2400 -1200 0 KOP Bld 1.51100 RTE Bld 2.5/700 ......:................................... i........... ....... ........................ 0 .. ... ........:.... eKe•dle ................ .............. 0 ..............................................i...........N...................i...................................i....................... /8" Csg Pt A A Z ^ -1200 ............i ...................................i...................................i...................................i................................... i........ ........................i....... ......................i...................................i...................................i.................. ~ -1200 0 0 N c I I 0) i :............... ...............i... cn 2400 ............:...................................:...................................:. .............................i...................................................................................... .................... ............. -2400 - ••~ i TDtlget 1 (P4) Target 1 LCt1 ~" -3600 ............• ................................................................. ............................. ............................. .............................. .............................. ....................... ...... ........... -3600 Target 2 Alpine C ~ L :TDl7"Csg -9600 -840 -7200 -6000 -4800 -3600 -2400 -1200 0 «< W Scale = 1(in):1200(ft) E »> Brooks Range Petroleum Company Tofkat #1 M~ SWACO ~. DRILLING FLUIDS PLAN Brooks Range Petroleum Corporation Tofkat #1 Mud Program ~~ Name Signature Date Originator: Kemp Webb Reviewed by: Hal Martens Customer A royal: Version: 1.3 Location North Slope Alaska Confidential 1 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat #1 Well Summary Tofkat #1 exploration well is located east of the native village of Nuiqsut. The Tofkat ice road spur will depart from the annual Alpine ice road and proceed south to the Tofkat ice pad location. A 16" conductor is planned to be set at 100' MD/TVD. The surface interval is planned to be a 12-1/4" hole drilled to a depth of 3,835' MD / 3,000' TVD at which point 9 5/8" surface casing will be run and cemented. The production interval is planned to be an 8-1/2" hole drilled to a final TD of 13,654' MD / 8,200' TVD and 7" production casing will be set at TD. The highest prognosed mud weight will be found in the production interval, with an expected mud weight of 9.5 and 10.7 ppg. As with all exploration wells some geologic uncertainty exists. Communicate with the rig team to determine what the actual needs of the well are. Remember the main purpose of the well is to gather information in a safe and environmentally sound manner. All decisions made concerning the integrity of the well should keep this in mind. Lost circulation may also occur in the final leg of this well. ECD's should be monitored closely. Contingency should be made to have extra volumes of drill-in fluids on hand prior to drilling ahead. Lost circulation material should also be readily available. Fluid and Drilling Concerns - Wellbore stability throughout the drilling phase of the operations. - Hole cleaning - Control of ECD's - Lost circulation -well control - Minimized torque and drag. - Good cement jobs. - Hole condition to allow logging operations. - Minimization and management of waste costs for the "drill cuttings" and associated fluids. Monitoring and efficient utilization of the trucks and gravel washer as required for this operation. Daily and interval summaries will be tallied and summarized for the end of well report. - HSE Location North Slope Alaska Confidential 2 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat #1 Project Summary Casing Size in Hole Size in Profile MD ft TVD ss ft Mud Density Range 9.625" 12.25" r~ . 3 835 000 3 9.5 - 9.8 , , Spud Mud 10.0 (initial) 7" 8.5" 13,654 8,200 10.0 - 10.7 (at TD) VERSAPRO NT Location North Slope Alaska Confidential Date: December 12, 2007 i Brooks Range Petroleum Company Tofkat #1 Surface Interval Drilling Fluid System Spud Mud Key Products MI Gel, GELEX, Caustic, MI WATE (Barite), DRISPAC PLUS SL, DRILLZONE, SCREENKLEEN, Solids Control Shakers, Mud Cleaner, Centrifuge Potential Problems Large gravel sizes can cause hole-cleaning problems. Sticky clays in the permafrost can slow ROP from bit and BHA balling. Swabbing in the clays may also be a problem. Hydrates may be encountered. To help ensure good cement to surface after running the casing, and if practical, condition mud to a funnel viscosit of - 55 - 100 sec/ t rior to cementin the casin . INTERVAL MUD PROPERTIES Mud Pro ert Initial Value Final Value TD Density (ppg) 9.5 9.5 - 9.8 Yield Point (cP) 50 - 70 45 - 60 PV (Ib/100 sf) 20 - 45 20 - 30 pH 9.0-9.5 9.0-9.5 API Filtrate (cc) NC - 8 < 8 Solids (%) ± 9% ± 9% Recommended Initial Spud Mud Formulation Soda Ash 0.2 ppb MI Gel 25 ppb (Add to the make-up water and allow to hydrate as long as is possible) GELEX Add prior to spud to increase the funnel viscosity to 250 - 300 sec/quart. MI WATE (Barite) For weight as needed Caustic Soda 0.02 ppb DRISPAC PLUS SL 0.25 ppb Recommended Sweep Formulation Add DRILZONE in 0.25% increments to minimize clay to metal sticking. Only use this procedure if deemed absolutely necessary. DRILZONE will be utilized for bit balling and screen blinding from clays with an initial concentration of 0.25%. Higher concentrations would be added if required, but results need to be carefully monitored and reported. Location North Slope Alaska Confidential 4 Date: December 12, 2007 ` Brooks Range Petroleum'Company Tofkat #1 Surface Interval Treatment Procedures - Gravel can cause hole-cleaning problems. If larger than normal gravel is encountered, be prepared to increase funnel viscosity from 250 - 350 sec/qt. Have GELEX available for an immediate response to this issue. - Mix the surface interval "Spud Mud" using the coldest water possible. Due to expected flow rates (and the associated temperature increase resulting from the flow rate), the temperature of all water added to the system should also be maintained at as low a temperature as possible. - Avoid washing out the shoe of the conductor pipe by drilling to 150' using a reduced flow rate 500 - 600 gpm) and then maintain flow rates as per the "Virtual Hydraulics Hole Cleaning Model" and stay below an effective 100 ft/hr ROP to ensure hole cleaning. Reduce pump rates immediately if packing off occurs. - Drill ahead. Adjust rheology, ROP, pipe rotation speed (60 - 80 rpm minimum), pipe running speeds and pump rates as needed to balance hole cleaning and ECD. - Drill ahead watching for wellbore instability problems. Any fluid weight adjustments should be performed in 0.1 0.2 Ib/gal increments if absolutely necessary. - Sticky clays in the permafrost and also in the zone below the permafrost can slow ROP from bit and BHA balling. Add DRILZONE (in 0.25% increments) and Nut Plug (as allowed by MWD tools) to minimize clay to metal sticking only if needed. - Add LoToRO if needed up to a concentration of 3% v/v. Ensure that hole cleaning is adequate prior to any lubricant additions are made to the system. Additions of lubricant over this recommendation concentration should be carefully considered. Do not use lubricants to mask the affects of hole cleaning or other problems that may be manifesting themselves as torque and drag issues. - Once the permafrost has been drilled, additions of small amounts of Mix II to lower fluid loss may be required. - Once the permafrost has been drilled begin to increase the proportion of polymer additions, while reducing the quantities of MI Gel that are used to maintain the rheology of the fluid. - Hydrates may be encountered. Determine severity of any influx and weight up as needed to maintain proper well control. See "Hydrate Issues enclosure". - To help ensure good cement to surface after running the casing, and if practical for existing hole conditions, condition mud to a funnel viscosity of +/_ 55 - 100 sec/qt (YP at 15 - 17) prior to cementing the casing. Have water on hand to ensure the desired rheologies can be achieved. Location North Slope Alaska Confidential Date: December 12, 2007 • Brooks Range Petroleum Company ~ Tofkat #1 Surface Interval S.C.E. Operation Standards Shakers- • LO/TO Shakers • Replace all decking rubber on the Derrick shaker beds. This will allow for optimum screen performance during drilling operations. It is important to develop a good preventive maintenance schedule which includes replacing the decking rubber before it becomes a performance related issue. • Install XR Magnum screens (84 - 110 mesh). Ensure screens are properly tensioned, per M-I Swaco's best practice suggestions. Spray down new screens with fresh water before operating the shakers. • As fluid shears, screen up as necessary to higher mesh screen sizes. • Ensure jacking system on the Derrick 48 HI G or equivalent shakers enables the fluid to flow to the center of the screens, adjust and lock as necessary. Centrifuge- Surface interval requires a greater through put during most operations, which require the centrifuge to run at a lower speed (2,500 - 1,800 rpm), high differential as well. This setting allows the centrifuge to process more fluid and discharge more cuttings. With the lower rpm's the cut point is reduce from 3 - 6 micron cut to approximately 6 - 10 micron which gives up cut point but processes more fluid. Swaco recommends and stands behind the suggestion to run the centrifuge at the lower speeds during the upper sections of hole. General- • Proper apex size on the de-sitter during this section will greatly improve the performance of the centrifuge and overall solids control performance of pit system. Drilling conditions may dictate several apex adjustments, close supervision of mud cleaner will be highly rewarded. Location North Slope Alaska Confidential 6 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat #1 Surface Interval Drilling Concerns - Lithology through this zone is a composite of pebble conglomerate and sand in the upper intervals with intermittent clay matrix. Carbonaceous material and coal may be noted. Based upon work done on previous exploration wells, a gel based spud mud is recommended for the surface interval. Initial viscosities of 150 - 175 sec/qt should be maintained through the permafrost. 9-5/8"" surface casing will be set and the cement will be pumped in a single stage to surface. - Gravel sizes can cause hole-cleaning problems. If larger than normal gravel is encountered be prepared to increase funnel viscosity to +175 - 200 sec/qt. - Sticky clays in the permafrost at and also in the zone below the permafrost can slow ROP from bit and BHA balling. If needed add DRILZONE (at 0.5 - 1.5%) and Nur PLUG M (as allowed by MWD tools) to help clean and clear the balled bit. - Use as much cold water as possible for the initial make-up and for additions made to the mud system during the surface drilling operations to help prevent permafrost thawing. Try to keep flow-line temperatures of 60°F or less while drilling this interval. - Maintain low flow rates for the initial 200' of drilling to reduce the chance of washing out the conductor shoe. - Swabbing in the clays may also be a problem. Maintain or slightly increase mud weight (0.1 ppg) and continue additions of surfactant at 15 to 30 gallons per hour and wiper runs through the surface interval may be necessary to clear the wellbore of the problem clays. DRILZONE or ScREENKLEEN maintained at 0.5 - 1.5% is also recommended to help with clay related issues. - To help insure good cement to surface after running the casing, condition mud to a YP of at least 25 - 30 prior to cementing the casing. Do not lower the YP beyond 25 to avoid trouble with sands that may be found on this well. Use water sparingly and ensure proper solids control equipment utilization is being observed to reduce the over all haul-off costs for this well. - Although a low potential risk, hydrates may be encountered (particularly at depths below the permafrost). Observe good drilling practices to determine severity of any influx and weight up as needed to maintain proper well control. See "Surface Hydrate Issues"enclosure for further information. Location North Slope Alaska Confidential 7 Date: December 12, 2007 • Brooks Range Petroleum Company Tofkat #1 Surface Interval Operations Recommendations Spud mud will be mixed on the rig or at M-I Swaco's Prudhoe Bay mud plant once the rig is spotted over the well. Use as much cold water as possible for the initial make-up and for additions made to the mud system during the surface drilling operations. - Drill ahead maintaining volume as needed. - Maximum fluid weight is planned to be 9.5 - 9.8 ppg for this interval. - Run all solids control equipment. Run 84 - 110 mesh shaker screens to maintain a moist discharge for enhanced solids removal. Add drill water below shaker to avoid washing unwanted solids back into the active system. Watch for "excessively wet" cuttings and change screens to a larger mesh should this occur. Minimization of "excessively wet" cuttings sent to Grind and Inject for disposal is a major cost reduction factor. - Lower API fluid loss with DRISPAC PLUS SL (or Poly Pac Supreme UL) as needed to maintain hole stability. - To control rheology additions of CF DESCO II may be needed. - Add DRILZONE or ScREENKLEEN (at 0.5 - 1.5%) and Nut Plug (at 15 ppb) to reduce bit balling in the clay sections if needed. DRILZONE at 0.5 - 1.5% may also be used to help with any clay issues. - If hole conditions allow, let the YP drop to 25 - 30 (no lower than 25) prior to cementing of the casing. Allow surface mud volumes to fall during the later stage of this interval to minimize waste fluid disposal costs. - Run and set the casing as per program. Treat the chase fluid and drill out mud for the upcoming cement drill out. - Upon drill-out of the surface casing shoe, treat any cement returns with SAPP, Sodium Bicarbonate, and PH-6 as needed. Location North Slope Alaska Confidential 8 Date: December 72, 2007 • • Brooks Range Petroleum Company Tofkat #1 Production Interval Drilling Fluid System VERSAPRO NT Key Products LVT-200, IMG 400, Lime, VERSACOAT HF, VERSAWET, VERSAMOD, VERSAHRP, S-200, Brine 10.8 CaCl2 , MI WATE Barite Solids Control Shakers, Mud cleaner, Centrifuge Potential Problems Lithologic instability near the wellbore. Lost Circulation Hole cleanin . Production Interval Drill-in Fluid Properties Properties Initial Value Density (ppg) 10.0 ppg -Initial Make-Up Weight 10.7 - Possible b TD Funnel Viscosity (seconds) 35 - 45 Yield Point (cP) 15 - 28 Plastic Viscosity (Ib/100 sf) 15 - 25 Oil :Water 70:30 Electrical Stability (mlVolts) 650 - 900 HTHP Fluid Loss (ml/30 min/200 psi/150° F) <4 VersaPro NT Formula Mineral Oil-LVT 200 (.825 SpG) 0.711 bbl IMG 400 6.0 ppb S-200 45 ppb Lime 7.5 ppb VERSACOAT HF 5.0 ppb VERSAWET 2.12 ppb MI WATE 53.37 ppb Brine (10.8 ppg CaCl2) 0.176 bbl VERSA MOD 0.5 ppb VERSA HRP 0.5 ppb Location North Slope Alaska Confidential 9 Date: December 12, 2007 • :Brooks Range Petro{eum Company Tofkat #1 Production Interval S.C.E. Operation Standards: Shakers- • Inspect decking rubbers, c/o as necessary. • Install XR Magnum screens (175-210 mesh). Ensure screens are properly tensioned, per M-I Swaco's best practice suggestions. Spray down new screens with fresh water before operating the shakers. • Set counterweights to 90% (7.8 G's) for optimum performance. • As fluid shears, screen up as necessary to higher mesh screen sizes. 210 mesh is optimum to reduce sand sized particles. • Ensure jacking system on ALSII shakers enables the fluid to flow to the center of the screens, adjust and lock as necessary. De-Silter- • Ensure cuttings trough bypasses shakers, and goes into cuttings ditch. Failure to do so will allow small particles to enter right back into system through the flow line shakers (84-110 mesh screens). • Install 3/8" Apexes. • Ensure that "feet of head" gauge is available at the De-Silter, not the pump. • Ensure that De-Silter feed pump can achieve 95' of head. CRITICAL! • Monitor discard, change apexes as necessary to improve solids content in mud (it may be determined that 3/8" apexes can be installed if cuttings in the system happen to be finer than presumed) • Discard should be 2-3 ppg over feed weight. Centrifuge- Production intervals generally call fora "high-speed" centrifuge, which is rotating at approximately 3200 rpm's. This allows the centrifuge to make the 3-6 micron cut, and eliminate a percentage of the "ultra fine" cuttings from the fluid. Through put must be decreased while running the centrifuge at 3200 rpm's, since there is a greater risk of "packing off' the centrifuge back drive and auger. Swaco would also suggest installation of amp meter on the back drive motor which will allow the operators to monitor the feed rates by knowing how much torque the back drive motor is receiving while trying to discharge the cuttings. Refer to mud man for solids information to determine speed and feed rate of centrifuge. Continual processing at low feed rates will yield better results than shutting centrifuge down and starting it up. Slow feed rate down to maintain an acceptable weight if needed. Location North Slope Alaska Confidential 10 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat,#1 Production Interval Considerations - Ensure that the fluid properties are maintained to provide the best possible hole cleaning. Maintain mud weights as per drilling program guide lines and ensure that rheology is optimized to reduce ECD's to a manageable level while drilling. Monitor for any fluid losses and flow back closely. - Control the ROP and flow rates as needed to avoid inducing a breakdown of any formations. Reduce pump rates immediately if packing off occurs. Pump high viscosity weighted sweeps and ream carefully to clean the hole before proceeding with further drilling - Adjust rheology, pipe rotation speed, pipe running speeds and pump rates as needed to balance hole cleaning and ECD. Use good drilling and tripping practices. Break circulation slowly -Reduce pump speed 15 to 20% while reaming down. - As an exploration well, pore pressure uncertainty also exists. Use all means possible to evaluate well conditions to determine if fluid properties are in line with the needs of the well. - SOLTEX may be required for shale stabilization prior to and throughout the HRZ. - Monitor and record drilling parameters on each connection and before and after any lubricant additions. - Upon reaching TD watch the bottoms-up cuttings closely. If the well does not readily cleanup or if there are any excess of torque, drag, pick-up or slack-off weights pump a second high viscosity/weighted sweep and observe bottoms up again. - Establish good hole conditions for any logging and testing that may be performed. - Fluid deliveries, fluid transfers, and cuttings disposal issues will be tracked on a daily basis. Location North Slope Alaska Confidential 11 Date: December 12, 2007 i • Brooks Range Petroleum Company Tofkat #1 Production Interval Operations - This interval will be drilled using an 8.5" bit to an expected interval TD of 13,654 MD / 8,200 TVD. Care should be taken to monitor all drilling criteria to ensure that best drilling practices are being observed. - Maintain low gravity drilled solids to below 6% with solids control equipment and dilution. Use the MI Solids Van to supplement rig equipment, if needed. - Use Virtual Hydraulics ECD predictions vs. PWD actual values to appraise hole cleaning and hole conditions. If possible do not allow actual ECD's to exceed 0.5 ppg over predicted "clean hole" ECD. - Drill to interval TD and circulate the wellbore clean (3 - 4 bottoms up may be needed) in preparation for logging and testing. - While drilling monitor the interval carefully for losses or gains. - Log and/or test the well as per program. - Plug back or complete as per program. Location North Slope Alaska Confidential 12 Date: December 12, 2007 Brooks Range`Petroleum Company Tofkat #1 Surface Interval Hydrate Issues Use the following guidelines to help minimize the effect that any hydrates which may have to the drilling operation. • Add 2 ppb Lecithin to the mud prior to drilling into the zone below the permafrost. CF DESCO II may be - used to adjust rheology after the Lecithin additions are made. • Weigh the mud at both the possum belly and at the suction pit using pressurized and regular mud balances to determine the amount of gas that has become entrained in the mud. • Maintain the fluid at below 60°F if possible. • Minimize circulation time to reduce hydrate thawing. • Watch both drill rates and flow rates and make adjustments as needed to help diminish any problems that the surface equipment may have in handling the fluid and cuttings while circulating out any hydrates. • Weight up prior to drilling out of the permafrost. Watch the rate of depletion of the hydrates and increase the weight as needed to control the gas breakout from the hydrates. Barite Sag Concerns Barite Sag (a reduction in the MW out due to the dynamic and static settling of barite) is a potential drilling hazard while using weighted fluids. Although this well is designed for a mud weights below -11.5 ppg unexpected conditions may make additional weight ups or lubricant additions necessary. Both of these changes may contribute to a more likely chance of barite sag issues. Barite Sag is also aggravated by circulating at low rates for extended periods of time or while tripping with drill pipe or casing. As a consequence, if it becomes necessary to circulate at reduced rates, it is recommended that the pit watcher weigh and record MW out using a pressurized and un-pressurized balance every 15 minutes. Trips and casing running should also be closely monitored for indications of barite sag. Location North Slope Alaska Confidential 13 Date: December 12, 2007 • Brooks Range Petroleum Company Tofkat #1 Lost Circulation Guidelines for Water-base Mud Losing fluid while drilling Stop drilling and observe levels Yes Locate and stop losses Losses on surface Yes Well flowing? Record shut in pressure. Kill the well Measure rate of loss Seepage losses < 10 bbl/hr I I Partial losses 10-100 bbl/hr I I Tota] loss of returns Water-based Water-based Water-based mud mud mud Pump 100 bbl pill of Continual additions of Mix Pump 50 bbl pill of: CaCO3 60 - 20 ppb II at 4 - 8 sacks/hr Change CaCO3 60 - 20 ppb CaCO3 15 - 15 ppb shaker screens to 84 mesh if convenient. CaCO3 15 - 20 ppb CaCO3 500 -15 ppb MI Seal - 20 ppb MI Seal - 20 ppb Mix II 10 ppb Nut Plug - 20 ppb Mix II - 10 ppb Spot pill: I No success Spot plug: Mica M 10 lb/bbl VersaPac or "Form-a" pill or No success Mix II M. 15 lb/bbl Reverse Gunk or Cement Mix II Coarse 10 Ib/bbl Spot plug: G-Seal 20 lb/bbl "Form-a" pill or Calc. Carb (C) ]0 lb/bbl Gunk or Nut Plug M 10 ]b/bbl Cement Location North Slope Alaska Confidential 14 Date: December 12, 2007 i Brooks Range Petroleum Company Tofkat #1 Recommended Lost Circulation LCM guidelines for VERSaPRO NT MOBM The following lost circulation "Decision Tree" is recommended for use in the event that losses occur while drilling the horizontal production interval. It has been selected because of its' compatibility with base oil and ability to seal with minimal formation damage. These products are predominately acid soluble which will make any stimulated cleanup (if needed) much easier. Losing fluid while drilling Stop drilling and observe levels ves Losses on surface Locate and stop losses Record shut in pressure. Kill OiUsynthetic mud Spot pill: G-Seal 15 ppb Calc. Carb. (M) 10 ppb Calc.Carb (C) 7 ppb ~ Yes ~ Well flowing? ~ Measure rate of loss ~ OiUsynthetic mud Spot pill: No success Mica M 7 ppb Calc Carb Med. 10 ppb G-Seal 20 ppb Calc. Carb (C) 7 ppb Oil/synthetic mud Squeeze pill: No success FORM-A-SQUEEZE 80 ppb in base oil weighted up to desired density Ensure particle sizes of bridging materials can pass through the downhole tools and motors prior to mixing and spotting. Spot pill across thief zone, if losses stop, pull into casing and apply 50-100 psi squeeze pressure and watch for pressure bleed- off. If pressure holds for 15 minutes, resume drilling. If pressure does not hold, spot another pill as described above. Be sure to clear the motor with anv Lost Circulation > No success Location North Slope Alaska Confidential 15 Date: December 12, 2007 ~ ~ Bro©ks.Range Petroleum Company Tofkat #1 Recommended LCM Pill for VersaPro NT System The following lost circulation pill is recommended for use in the event that losses occur while drilling the horizontal production interval. It has been selected because of its' ability to seal with minimized formation damage. These products are predominately acid soluble which will make any stimulated cleanup (if needed) much easier. - To existing VersaPro NT circulating fluid make a LCM pill with: • 15 ppb LoWate (fine calcium carbonate) • 15 ppb Safe-Garb Medium (medium calcium carbonate) • 15 ppb Safe-Garb Coarse (course calcium carbonate) Insure particle sizes of bridging materials can pass through the downhole tools and motors prior to mixing and spotting. 1. Spot pill across thief zone, if losses stop, pull into casing and apply 200-psi squeeze pressure and watch for pressure bleed-off. If pressure holds for 15 minutes, resume drilling. If pressure does not hold, spot another pill as described above. 2. If losses cannot be stopped with calcium carbonate only, mix up a LCM pill with 25 ppb MIX II Fine and 15 ppb MIX II Course cellulosic material and spot as above. If seepage losses occur after drilling is resumed, consideration should be given to adding 5 - 8 ppb MIX II Fine cellulosic material to system while circulating. Location North Slope Alaska Confidential 16 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat #1 HSE Issues Handling of Drilling Fluid Products Health and Safety - Drilling crews should be instructed in the proper procedures for handling fluid products. - Personal Protective Equipment (PPE) charts should be posted in the pit room, the mud lab, and the office of the Drilling Forman. - PPE must be in good working order and be utilized as recommended by the PPE charts. - Product additions should be made with the intent to use complete unit amounts of products (sacks, drums, cans), as much as possible in order to minimize inventory of partial units. - Ensure all MSDS sheets are up to date and readily available for workers to access for information. Environmental - Ensure that all product stored outside is protected from the weather. - Do not store partial units (sacks) outside if possible. - When transferring fluids and/or cuttings from the rig to tanks, ensure all hoses are properly secured. Perform a transfer checklist as needed in order to avoid spills. 0 o e a a Location North Slope Alaska Confidential 17 Date: December 12, 2007 • Brooks Range Petroleum Company Tofkat #1 PPE Chart Product Function Health Flammability Reactivity PPE CAUSTIC SODA Ikalinity control 3 0 1 X PH-6 pH Adjuster 1 0 0 E DEFOAM X Defoamer 1 1 0 J CF DESCO II Dispersant 1 1 0 E SCREENKLEEN Surfactant 1 1 0 E GREEN CIDE 25G Biocide 3 0 0 J MI WATE (Barite) eighting Agent *1 0 0 E MI GEL iscosifier *1 1 0 E MIX II Lost Circulation Material *1 1 0 E DRISPAC PLUS SL Fluid Loss Reducer 1 1 0 E SAPP Dispersant 1 1 0 E MI GEL iscosifier *1 1 0 E GELEX Bentonite Extender 1 1 0 E LVT 200 Mineral Oil 1 1 0 J G SUPREME iscosifier 2 1 0 J LIME Calcium Source 2 0 0 E ERSACOAT HF Emulsifier *2 3 0 J ERSAWET Drilling Fluid Additive 1 1 0 J CACL2 eighting Agent 1 0 1 E ERSA-MOD Rheology Modifier 1 2 0 J ERSA HRP iscosifier 2 1 0 J SAFECARB Bridging Agent *1 0 0 E A O ~ C!F.+ 6 Location North Slope Alaska Confidential 18 Date: December 12, 2007 Brooks Range Petroleum Company Tofkat #1 HMIS HAZARD RATINGS (for use with the PPE Chart) HAZARDOUS MATERIALS IDENTIFICATION SYSTEM (HMIS) HAZARD RATINGS 4 -Severe hazard 3 -Serious hazard 2 -Moderate hazard 1 -Slight hazard 0 -Minimal hazard • An asterisk next to the health rating indicates that a chronic hazard is associated with the material. HMIS PERSONAL PROTECTIVE EQUIPMENT INDEX A -Safety Glasses B -Safety Glasses, Gloves C -Safety Glasses, Gloves, Synthetic Apron D -Face Shield, Gloves, Synthetic Apron E -Safety Glasses, Gloves, Dust Respirator F -Safety Glasses, Gloves, Synthetic Apron, Dust Respirator G -Safety Glasses, Gloves, Vapor Respirator H -Splash Goggles, Gloves, Synthetic Apron, Vapor Respirator -Safety Glasses, Gloves, Dust and Vapor Respirator J -Splash Goggles, Gloves, Synthetic Apron, Dust and Vapor Respirator K -Air Line Hood or Mask, Gloves, Full Suit, Boots X -Consult your supervisor for special handling directions See Material Safety Data Sheets (MSDS) for more information M-I L. L. C, Occupational Health Department (Revision -April 10, 2003) Houston, TX, Telephone: 281/561-1509 M-I L. L. C, Occupational Health Department (Rev. 4Aug-98) Houston, TX, Telephone: 281/561-1509 080598PRHS-1 Location North Slope Alaska Confidential 19 Date: December 12, 2007 Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation 2007/08 Exploration Campaign REVISION #4: Tofkat #1 Cementing Program Prepared forAmjad Chaudhry Fairweather E & P Services, Inc. December 11, 2007 Submitted by: Mark Wedman, PE Sr. District Product Service Line Manager -Cementing Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK. 99518 (907) 275- 2610 -office (907) 223-5763 -cell HALLIBURTC~N BROOKS RANGE~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration - Tofkat #1 Cementing Services Cementing Summary - Tofkat #1 Revision Notes: Revision #1 (10-26-07) • Remove all reference/programs pertaining to Tolkat #lA sidetrack contingency • Remove PTA program for Toflcat #1 • Remove all references to "formerly Titania" • Rerun programs with new directional plan o Changed MD of surface casing setting depth to 3,931 from 3,915' o Changed setting depth of 7" casing from 11,565' MD/ 7,500 TVD to 12,264' MD / 7,505' TVD • Include an additional centralization program fora "hard-entered" 67% standoff on 7" casing. Revision #2 (10-26-07) • Rerun programs with second revision of directional plan o Changed MD of surface casing setting depth to 3,815 from 3,931' o Changed setting depth of 7" casing from 12,264' MD / 7,505' TVD to 12,139' MD/ 7,500' TVD Revision #3 (11-17-07) • Rerun programs with third revision of directional plan o Changed MD of surface casing setting depth to 3,835 from 3,815' o Changed setting depth of 7" casing from 12,139' MD/ 7,500' TVD to 13,654' MD/ 8,200' TVD • Changed base of permafrost from 1,000' to 1230' TVD / 1,241' MD as indicated on new directional plan • Added back the PTA program Revision #4 (12-11-07) • Removed 7" casing from program " • Added 8 ''h" open hole PTA and whipstock program. Assumptions: 16" Conductor is preset to depth of 80', weight is 65#/ft 9-5/8" Surface Casing: o Weight of 9-5/8" casing is 40 #/ft & thread is BTC o Conventional cement job (i.e. not innerstring) 0 30% open hole excess below permafrost, 150% excess within permafrost. o Frac Gradient 14.0 ppg @ 3,000' TVD ISO 14001 Certified H A L L I B U R TO N Alaska Green Star Certified BROOKS RANGE~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration - Tofkat #1 Cementing Services Cementing Summary - Tofkat #1 (cont'd) 9-5/8" Surface Casing ~ECD Program based on TOC at surface with a frac gradient of 14.0 ppg at 3,835'/3,000' MD/TVD Length of Tail Slurry (ft) Length of Lead Slurry (ft) Max ECD (ppgl ~ 1,000 2,835 1244 centralization The minimum recommended standoff for centralization is the standoff required for a minimum of'h" annular radial clearance (or 38% standoff in a 9-5/8" casing by a 12-1/4" hole). With radial clearances less than 'h"- the probability of channeling cement is high. A maximum of 1 centralizer per joint and minimum of 1 centralizer per 400ft of pipe was utilized within the centralization program. Number of Centralizers/Type Standoff Achieved 45 Total Bow Spring Centralizers 38.5% Radial Clearance Achieved (in) 0.51" H~4-LLIBURTON ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration - Toflcat #1 Cementing Services Cementing Summary -Tofkat #1 (cont'd) Summary of Plugs -Tofkat #1 Planning/Assumptions: A number of options exist for plugging the well depending on well construction status at the time of plugging (i.e. production casing set or not) and whether or not the plugging operations are for PTA or Suspension purposes. It is assumed for purposes of this program that that 8-1/2" hole was drilled in the Toflcat #1 main wellbore and casing was not set. It is assumed that hydrocarbon zones were present requiring open hole abandonment of those intervals. The cement volumes and qty of open hole hydrocarbon abandonment plugs are unknown. For planning purposes, an open hole plug sufficient for 1,000' of fill is presented. A 750' open hole cement whipstock plug will then be set to effect a kickoff for the sidetrack. • Plug #1 (Open Hole Hydrocarbon Bearing Interval)) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess • Plug #2 (Whipstock Plug inside 8-1/2" Open Hole and 9-5/8" 40#/ft Surface Casing) Displacement or Balanced Plug method: Place a 750' densified whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. ISO 14001 Certified HALLI B l.! RTC N Alaska Green Star Certified BROOKS RANGE~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration - Toflcat #1 Cementing Services BROOKS RANGE PETROLEUM CORPORATION 2007-OS Exploration Project Alaska; USA TOFKAT #1 OptiCem -REVISION #4 Cement 9-5/8" Surface Casing Prepared for: Amjad Chaudhry December 11, 2007 Prepared by: Mark Wedman Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK 99518 907-275-2610 -office 907-223-5763 -cell HALLIBURTON The Future Is Working Together. ISO 14001 Certified 1-~ A L L I B U R TO 1V Alaska Green Star Certified BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration - Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing Well Conditions Casing Size & Wt. 9-5/8" 40#/ft L-80 BTC-M Volume Excess: 150% permafrost/30% below Setting Depth: 3,835' MD, 3,000' TVD Mud Wt. 10.0 ppg Conductor Casing: 16" 65#/ft 0 -80' Mud PV/yP 16/20 Hole Size 12-1/4" Frac Gradient: 14.0 ppg @ 3,000' TVD Top of Cement: Surface Permafrost Depth: 1,230' TVD / 1,241' MD Ft of Fill -Tail Slurry 1,000' BHST/BHCT: 85/60°F Slurry Recommendation: Preflush /Spacer 10 bbl Water, 20 bbl 10.3 ppg Alpha Spacer Lead Slurry: 288.4 bbls - 390 Sks. PERMAFROST Type L Tail Slurry: 79.0 bbls - 382 Sks. Premium Cement, 2% Calcium Chloride Displacement: 284.4 bbls. Mud Spacer Lead Slurry Tail Slurry Density (ppg) 8.34 / 10.3 10.7 15.9 Yield (cu ft / sk) 4.15 1.16 Water requirements (gaUsk) 20.3 5.00 Thickening Time Hr: min. 6:00+ +/- 3:00 Compressive Strength -PSI 12 hr (est.) (48 Hr.) 25 1,650 24 hr (est.) (72Hr.) 260 1,800 Volumes based on: Lead slurry: Top of Lead cement @ Surface - BOC 2,835' 80 feet 9-5/8" by 16" 65#/ft conductor annulus +plus 1,161' 9-5/8" by 12-1/4" open hole in permafrost plus 150% excess + 1,594' 9-5/8" by 12-1/4" open hole below permafrost + 30% excess. Tail slurry: Top of Tail slurry 1,000' above shoe - TOC 2,835' 1,000' calculated annulus volume +30% excess + 85 foot shoe joint. *Notes 1. Have additional lead cement (Type L Permafrost) on location equivalent to 250% excess within the permafrost. Total amount Type L Permafrost to bring to location is 436 sacks. 2. A tracer pill could be utilized to monitor circulating volume to obtain better information as to actual % excess cement required. ISO 14001 Certified HALLI B U RT~I N Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration -Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Design Customer Information Customer Brooks Ran a Petroleum Cor oration Sales Order Job Confi uration Conventional Cement Well Name Tofkat #1 WeII Number Start Time Saturda ,November 17, 2007 Count State Alaska UWI/API Count United States of America H2S Present Unknown CO2 Present Unknown Customer Re resentative Am'ad Chaud Service Re resentative Mark Wedman Desi n Name Brooks Ran a Tofkat #1 Surface Comment '7n'ection Path Casin Parameters Fracture Zone Measured De th 3835.0 ft Fracture Zone Gradient 0.727 si/ft Fracture Zone Densit 14.00 Ib/ al fracture Zone Pressure 2182 si Reservoir Measured De th 3835.0 ft Reservoir Pore Pressure 1527 si Reservoir Zone Gradient 0.509 si/ft Reservoir Zone Densit 9.80 Ib/ al Back Pressure 0 si Rate Redesi n Safet Factor 10 si Simulator Volume Increment 10.00 bbl Shoe Track Len th 85.0 ft Additional" Pressure to Seat Plu 1000 si Eccentricit Enhanced Calculations No Erodibili Enhanced Calculations No Use Coupling Information No Wellbore Geometry MD Hole Ex. Hole Dia. Casing OD Casing ID Casing Wei ht ft ` % in in in Ibfft 80.0 0.00 15.250 9.625 8.835 40.000 1241.0 150.00 15.369 9.625 8.835 40.000 3835.0 30.00 12.934 9.625 8.835 40.000 ISO 14001 Certified HALLI B U RTO N Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration - Toflcat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Pumping Schedule No. Descri tion Densi Rate Volume Duration Ib/ al b m bbl min 1 10.0 Surface Mud 10.00 5.00 0.00 0.00 2-1 AI ha S acer 10.30 5.00 20.00 4.00 2-2 Shutdown 5.00 3 Permafrost L 10.70 5.00 288.37 57.67 4 Surface Tail 2% CC 15.90 5.00 78.96 15.79 To Plu 5 10.0 Surface Mud 10.00 5.00 284.35 56.87 Total 671.68 139.34 Fluid Rheology -Bingham Plastic Fluid Tem PV YP Seed Dial °F c Ibf/ 100*ft2) r m 10.0 Surface Mud 80 16.00 20.00 AI ha S acer 75 12.00 5.00 Permafrost L 50 20.97 12.42 300 32.00 200 27.00 100 18.00 Surface Tail 2% CC 70 49.43 74.55 300 119.00 200 104.00 100 86.00 Fracture Gradient/Pore Pressure Profile Measured. True Pore Reservoir Reservoir Fracture Fracture Fracture Depth Verticai Pressure Gradient Density Gradient Density Pressure De th ft ft si si/ft Ib/ al si/ft lb/ al si 3835.0 2999.9 1527 0.509 9.80 0.727 14.00 2182 ISO 14001 Certified 1'-IALLI B U RTt~ N Alaska Green Star Certified Brooks Range Petroleum Corporation 2007/08Exploration - Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Centralizers Centralizer Parameters Calculated Standoff/Spacing Profile Fluid Profile During Mud Conditioning Mud Density 10.00 lb/gal Maximum Distance between Centralizers 400.0 ft Minimum Distance between Centralizers 10.0 ft Top of Centralized Interval Measured Depth 10.0 ft Top of Centralized Interval Standoff 100.00 Centralizer Specifications .Part Number Type* COD 'Hole Dia. Nom. Dia. Min. Dia. Start Force Run Force Rest. Force Bows in in in in Ibf Ibf Ibf 806.60065 BS 9.625 12.250 13.500 11.250 1151 508 2955 8 *BS -Bow Spring, R(S) -Rigid Solid, R(PB) -Rigid Positive Bar Constant Spacing/Standoff Centralizer Intervals Base of Centralizer A Centralizer B Pattern Required Spacing Interval Part Number Part Number Standoff Measured be 'th ft % ft. 3835.0 806.60065 A 38.00 BROOKS RANGE~TROLEUM CORPORATION ISO 14001 Certified HALLI B U RTO N Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration - Toflcat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Centralizer Spacing/Standoff Calculations No. Centralizer Part Number Type Spcng MD Hole Dev. Hole Az. Qc#uat SO Rest. Force Casing Ten. ft ft % Ibf Ibf 45 806.60065 BS 44.9 3835.0 66.2 0.0 38.30 695 0 44 806.60065 BS 63.7 3790.1 65.6 0.0 38.35 1666 628 43 806.60065 BS 63.4 3726.4 64.7 0.0 37.52 1922 1552 42 806.60065 BS 63.4 3663.0 63.8 0.0 38.50 1887 2501 41 806.60065 BS 63.9 3599.7 62.9 0.0 38.35 1864 3480 40 806.60065 BS 64.3 3535.8 62.0 0.0 38.31 1845 4497 39 806.60065 BS 64.8 3471.5 61.1 0.0 38.31 1825 5552 38 806.60065 BS 65.2 3406.7 60.1 0.0 38.33 1803 6644 37 806.60065 BS 65.7 3341.5 59.2 0.0 38.34 1780 7776 36 806.60065 BS 66.3 3275.7 58.3 0.0 38.36 1756 8947 35 806.60065 BS 66.8 3209.5 57.3 0.0 38.38 1731 10158 34 806.60065 BS 67.5 3142.6 56.4 0.0 38.40 1705 11412 33 806.60065 BS 68.1 3075.2 55.4 0.0 38.42 1678 12708 32 806.60065 BS 68.8 3007.1 54.5 0.0 38.45 1650 14049 31 806.60065 BS 69.5 2938.3 53.5 0.0 38.48 1620 15436 30 806.60065 BS 70.4 2868.7 52.5 0.0 38.31 1589 16870 29 806.60065 BS 71.2 2798.3 51.5 0.0 38.49 1557 18355 28 806.60065 BS 72.2 2727.1 50.5 0.0 38.34 1523 19890 27 806.60065 BS 73.3 2654.8 49.5 0.0 38.34 1487 21480 26 806.60065 BS 74.4 2581.5 48.4 0.0 38.36 1449 23127 25 806.60065 BS 75.6 2507.1 47.4 0.0 38.39 1409 24834 24 806.60065 BS 77.0 2431.5 46.3 0.0 38.42 1367 26603 23 806.60065 BS 81.5 2354.6 45.2 0.0 38.38 1270 28440 22 806.60065 BS 94.5 2273.1 43.8 0.0 38.34 1024 30433 21 806.60065 BS 104.4 2178.6 41.3 0.0 38.30 753 32839 20 806.60065 BS 121.7 2074.1 38.6 0.0 38.38 577 35603 19 806.60065 BS 365.0 1952.5 35.5 0.0 38.37 512 38961 18 806.60065 BS 96.4 1587.4 26.0 0.0 37.64 1774 50072 17 806.60065 BS 94.2 1491.0 23.6 0.0 37.50 988 53066 16 806.60065 BS 87.7 1396.9 21.1 0.0 37.53 1186 56042 15 806.60065 BS 83.1 1309.1 18.9 0.0 37.60 1330 58855 14 806.60065 BS 66.8 1226.1 16.7 0.0 37.51 1348 61550 13 806.60065 BS 65.2 1159.3 15.0 0.0 37.54 1317 63736 12 806.60065 BS 63.1 1094.1 13.3 0.0 37.53 1405 65887 11 806.60065 BS 63.1 1031.0 11.7 0.0 37.83 1423 67980 10 806.60065 BS 63.2 967.9 10.2 0.0 38.45 1379 70084 9 806.60065 BS 63.2 904.7 8.8 0.0 37.56 1405 72200 8 806.60065 BS 61.5 841.5 7.4 0.0 37.53 1486 74322 7 806.60065 BS 60.1 780.0 6.1 0.0 37.51 1545 76394 ISO 14001 Certified H A L L I B U R T O N Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE~TROLEUM CORPORATION 2007/08Exploration - Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Centralizer Spacing/Standoff Calculations No. Centralizer.. Part Number Type Spcng MD Hole Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ft % Ibf Ibf 6 806.60065 BS 58.8 719.9 4.8 0.0 37.52 1603 78424 5 806.60065 BS 57.6 661.1 3.5 0.0 37.53 1656 80412 4 806.60065 BS 56.4 603.6 2.3 0.0 37.55 1707 82360 3 806.60065 BS 58.5 547.1 1.0 0.0 38.47 1622 84271 2 806.60065 BS 400.0 488.6 0.0 0.0 52.60 772 86253 1 806.60065 BS 88.6 88.6 0.0 0.0 56.58 0 99806 10.0 56.58 0.0 **100.0 0 *BS -Bow Spring, R(S) -Rigid Solid, R(PB) -Rigid Positive Bar "* Default standoff above centralized interval. Simulation Volume and Pressure Results Volume and pressure results calculated at the end of the job. Annulus fluid is heavier than casing fluid by 251 psi. Apply appropriate back pressure on casing if floating equipment does not hold properly. Pumping Schedule -Modified Rates No, Descri tion Densit Rate Volume Duration Ib/gal b m bbl min 1 10.0 Surface Mud 10.00 5.00 0.00 0.00 2 AI ha S acer 10.30 5.00 20.00 4.00 5.00 3 Permafrost L 10.70 5.00 288.37 57.67 4 Surface Tail 2% CC 15.90 5.00 78.96 15.79 5 10.0 Surface Mud 10.00 5.00 284.35 56.87 If OptiCem-RT will be run during this job, enter this data in the CementJob window and execute the simulator again. ISO 14001 Certified H A L L I B U~ TO N Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration - Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Horsepower, Pressure, Freefall Time: Liquid Volume In Pump Output Surface Pressure In Surface Pressure Out ECD @ TD ECD @ Frac Zone Free Fall Height ...min. bbl h si si Ib/ al Ib/ al ft 0.02 0.08 16.4 120 0 10.54 10.54 0.0 9.02 20.08 15.7 114 0 10.54 10.54 0.0 29.00 120.00 9.4 62 0 10.54 10.54 0.0 49.00 220.00 4.3 20 0 10.54 10.54 0.0 66.69 308.45 1.8 0 0 10.53 10.53 9.3 82.48 387.41 1.8 0 0 10.65 10.65 418.3 101.00 480.00 1.8 0 0 10.80 10.80 205.7 121.00 580.00 4.2 20 0 10.93 10.93 0.0 139.17 670.84 51.2 403 0 12.43 12.43 0.0 139.35 671.68 0.0 1407 0 11.59 11.59 0.0 Final Position of Stages Stage Description Annular Len th Casing Len th Annular To MD Casing..:. To MD ft ft ft ft 10.0 Surface Mud AI ha S acer 0.0 0.0 Permafrost L 2835.0 0.0 Surface Tail 2% CC 1000.0 85.0 2835.0 3750.0 10.0 Surface Mud 3750.0 0.0 Final Annular Fluid Density Measured De th Densi Qualit H drostatic Gradient ft Ib/ al % ib/ al 0.0 10.30 0.00 10.30 145.4 10.70 0.00 10.70 500.0 10.70 0.00 10.70 790.8 10.70 0.00 10.70 1077.7 10.70 0.00 10.70 1478.5 10.70 0.00 10.70 2168.0 10.70 0.00 10.70 2719.6 10.70 0.00 10.70 3133.3 15.90 0.00 11.04 3822.8 15.90 0.00 11.58 3834.5 15.90 0.00 11.59 ISO 14001 Certified HALLI B U RTO N Alaska Green Star Certified • Brooks Range Petroleum Corporation BROOKS RANGETROLEUM CORPORATION 2007/08Exploration - Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Time of Events Time Frac Zone' ECD Res Zone. ECD Stage Starts Pumping .Stage Enters Annulus rnin Ib/ al Ib/ al 0.02 10.54 10.54 2. AI ha S acer 9.02 10.54 10.54 3. Permafrost L 65.00 10.53 10.53 2. AI ha S acer 66.68 10.53 10.53 4. Surface Tail 2% CC 67.00 10.53 10.53 3. Permafrost L 82.48 10.65 10.65 5. 10.0 Surface Mud 125.00 10.97 10.97 4. Surface Tail 2% CC 139.33 12.44 12.44 Prior to lu landin 139.35 11.59 11.59 Plug Landed Job Stage Summary -Liquid Volume and Density, Design Shutdown Number Design Volume Actual Volume Design Densit Average Densit Minimum Densit Maximum Densit bbl bbl Ib/ al Ib/ al Ib/ al {b/ al 2 20.00 20.00 10.30 10.30 10.30 10.30 3 288.37 288.37 10.70 10.70 10.70 10.70 4 78.96 78.96 15.90 15.90 15.90 15.90 5 284.35 284.35 10.00 10.00 10.00 10.00 Stage Summary -Pump Pressure and ECD Number Average Pump Pressure Minimum Pump Pressure Maximum Pump Pressure. Average ECD Minimum " ECD Maximum ECD si si si 1b/ al Ib/ al Ib/ ai 2 132 130 134 10.34 10.03 10.54 3 63 15 128 10.54 10.52 10.55 4 15 15 15 10.58 10.53 10.66 5 85 15 418 11.13 10.64 12.44 ISO 14001 Certified H A L L I B U R TO N Alaska Green Star Certified BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Fluid Positions (graph) OptiCem Fluid Positions at Job End Time = 1 39.35 min, Volume In 671 .68 bbl 0 1000 2000 3000 4000 5000 10 12 14 16 20 Density (]b/gal) Fluids Pumped ~ 10.0 Surface Mud ~ Alpha Spacer r i'crmai~rust L. ~ Surface Tail 2% CC Down Hole Depth Casing Annulus 30 Customer: Brooks Range Petroleum Corporation Job Date: 17-Nov-2007 Sales Order #: Well Description: Tofkat #1 UWI: A L LIB U R T O N OptiCem v6.1.0 1 7-Nov-07 20:41 ISO 14001 Certified HA,LLI B U RTO Alaska Green Star Certified • i 10 0 10 20 Diameter (in) BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -Tofkat #1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Circ Pressure & Density - Frac Zone (graph) OptiCem Circulating Pressure and Density at Fracture Zone Downhole Annular Pressure and ECD vs. Liquid Volume Circulating Pressure Hydrostatic Pressure 2300 2200 Fracture Pressure/ECD at 3000 ft TVD 14 Safe Pressure/ECD at 3000 ft TVD 2100 l3 2000 ` ~ 1 900 ~ 12 1800 ~ ~ { 1700 11 1600 __ _ 0 0 ft T_V_ D 1 0 1500 0 1400 9 0 100 200 300 400 500 600 700 Volume In (bbl) Customer: Brooks Range Petroleum Corporation Job Date: 17-Nov-2007 Sales Order Well Description: Tofkat #1 UWI: Alpha Spacer Permafrost L Surface Tail 2% CC 5~ 10.0 Surface Mud n t.~ ns~~iz rc>~ OptiCem v6.1.0 1 7-Nov-07 20:41 ISO 14001 Certified L..I B U R TO Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration - Toflcat # 1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Downhole Pressure Profiles (graph) -500 0 500 1000 ~ 1500 2000 2500 3000 3500 4000 OptiCem Downhole Pressure Profiles Minimum Hydrostatic Pressure and Maximum ECD vs. TVD Pore Pressure Gradient Fracture Gradient Minimum Hydrostatic Gradient ~1a?~imultu ~;Ci~ Previous Ca ing LJ 9 10 I1 12 ECD (lb/gal) 13 Customer: Brooks Range Petroleum Corporation Job Date: 17-Nov-2007 Sales Order #: Well Description: Tofkat #l UWI: 14 A I_ L i ki l I2 l <? N OptiCem v6.1.0 17-Nov-07 20:41 ISO 14001 Certified HALLS ~ ~ RT~ Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration -Tofkat # 1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Final Density & Hydrostatic Profile (graph) 0 OptiCem Final Density and Hydrostatic Profile Annular Fluid Density vs. Measured Depth Density Hydrostatic Gradient 500 1000 ~ 1500 2000 2500 3000 3500 4000 } l0 11 12 13 14 15 Density/Hydrostatic Gradient (lb/gal) Customer: Brooks Range Petroleum Corporation Job Date: 17-Nov-2007 Sales Order #: Well Description: Tofkat #1 UWI: 16 A I. 1. I Ii l! K l~ U N OptiCem v6.1.0 1 7-Nov-07 20:41 ISO 14001 Certified HALLI B U RTO Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE PETROLEUM CORPORATION 2007/08Exploration -Tofkat # 1 Cementing Services Tofkat #1 - 9-5/8" Surface Casing (cont'd) Summary (graph) OptiCem Summary CD at 3000 ft TVD, W ellhead Pressure, Pump Rate, and Density vs. Liquid Volum ECD Fluid Density W ellhead Pressure Rate 16 ~-. ~p 1 5 14 13 b 12 1 1 10 M C~ 9 0 500 250 .~ 000 50 00 50 6 -5 4 3 N 2 0 Customer: Brooks Range Petroleum Corporation Job Date: 17-Nov-2007 Sales Order #: Well Description: Tofkat #1 UWI: HALLIBURTON A LLIB U RTO N OptiCem v6.1.0 1 7-N ov-07 20:41 ISO 14001 Certified Alaska Green Star Certified •i 100 200 300 400 500 600 700 Volume In (bbl) • BROOKS RANGE~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -Tofkat #1 Cementing Services BROOKS RANGE PETROLEUM CORPORATION 2007-08 -Exploration Project Alaska; USA REVISION #4 TOFKAT #1 Abandonment (7" Not Set) Whipstock Plug for Tofkat #lA Sidetrack Cement Plugs Prepared for: Amjad Chaudhry December 11, 2007 Prepared by: Mark Wedman Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK 99518 907-275-2610 -office 907-223-5763 -cell HALLIBURTON The Future Is Working Together. ISO 14001 Certified H A L L I B U R TO N Alaska Green Star Certified • BROOKS RANGE• ROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -Tofkat #1 Cementing Services Plugs -Tofkat #1 Abandonment &Tofkat #1A Whipstock It is assumed for purposes of this program that that 8-1/2" hole was drilled in the Tofkat #1 main wellbore and casing was not set. It is assumed that hydrocarbon zones were present requiring open hole abandonment of those intervals. The cement volumes and qty of open hole hydrocarbon abandonment plugs are unknown. For planning purposes, an open hole plug sufficient for 1,000' of fill is presented. A 750' open hole cement whipstock plug will then be set to effect a kickoff for the sidetrack. Plug #1 (Open Hole Hydrocarbon Bearing Interval)) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess Plug #2 (Whipstock Plug inside 8-1/2" Open Hole and 9-5/8" 40#/ft Surface Casing) Displacement or Balanced Plug method: Place a 750' densified whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. Plug #1: Displacement or Balanced Plug method (Hydrocarbon bearing interval) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess Plug Slurry #1: 91.3 bbls - 446 sks. Premium Cement+ 0.4% Halad-344 (Fluid Loss Additive), + .2% CFR-3 (Friction Reducer), + 0.1 % HR-5 (Retarder) or as required Density (ppg) Yield (cu ft / sk) Water requirements (ga]/sk) Fluid Loss (cc/30 min.) Free Water Thickening Time Hr: min. Compressive Strength -PSI 12 hr (est.) 24 hr (est.) HA,LLIBURTt'~IV Plug Slurry 15.8 1.15 5.00 <100 0 +/- 3:00 >800 @ 150°F >1,300 @ 150°F ISO 14001 Certified Alaska Green Star Certified • BROOKS RANGE ~TROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -Tofkat #1 Cementing Services Plugs -Tofkat #1 Abandonment &Tofkat #1A Whipstock (cont'd) Plug #2: Displacement or Balanced Plug method (750' Whipstock Plug inside 9-5/8" 40#/ft casing) Displacement or Balanced Plug method: Place a 750' densif"ied whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. Plug Slurry #2: 66.2 bbls - 375 sks Premium Cement+ 0.5% Halad-344, + .2% CFR-3 + HR-5 if required Cement Slurry Pronerties* Pronerties Density (ppg) Yield (cu ft / sk) Water requirements (gal/sk) Thickening Time Hr: min. @ 100 F Compressive Strength -PSI -13 hr (UCA)) Compressive Strength -PSI -23 hr (UCA)) HALLIBURTt'~N Kick-offPluQ Slurry 17.0 0.99 3.82 +/- 4:00 1,400 @ 70 °F 3,240 @ 70 °F ISO 14001 Certified Alaska Green Star Certified • Brooks Ranee Petroleurrt Corporation a suhsutiar'v of ~ 6"C{i, Z.LC To: Art Saltmarsh (A.O.G.C.C) From: Larry Smith and Doug Hastings Re: Drilling Hazard Analysis for the Tofkat-O1 well. Date: January 10, 2008 Tofkat-Ol well hydrates/ shallow gas assessment from Seismic: Back round: Investigation of seismic data for indications of potential anomalous high pressure zones is a requirement of the AOGCC Regulations. In practice, the only well to have experienced uncontrolled flow of shallow gas is the Cirque #1 well, which blew out in 1991 when it encountered shallow hydrates at 1200' feet md. Cirque #1 is located approximately 11.5 miles southeast of the proposed Tofkat-1 location (see Figure 1). There were no recordable drilling incidents with any of the nearby wells in the area (Oberon #l, Nanuks #l, #2 and #3, Clover A, Atlas #1, Cronus #1, Colville River #1, and Berschrund #2). ). John Buggenhagen conducted Shallow Hazards Analyses on both Oberon #1 and Titania #1, using their Nanuk 3D seismic data: he found "...no apparent shallow hazards or large pressure anomalies at the proposed Oberon #1 and Titania locations." Our surface location is several thousand feet east of CPAI's planned locations, so we have reviewed 2D seismic data in our possession for indications of Hazards. Due to their composition, gas hydrates are not detectable on conventional seismic amplitude displays. Seismic compressional velocities in hydrates are very. similar to the ice velocities in the permafrost (>10,000 ft/sec). Any amplitude or attenuation anomalies associated with hydrates are from free gases which are just below the base of the hydrates ~ (Bob Hunter, verbal communication). Based on logs from the Oberon #1 well, the base of the permafrost is at approximately 1160 ft which equates to approximately 280ms on the seismic data. The base of the permafrost is poorly imaged on seismic due to its transitional character. ConocoPhillips investigated 3D seismic data at the Cirque location for shallow anomalies that could correlate with and indicate the risk of the gas which that was subsequently encountered in Cirque #1 -they were unsuccessful (Memo from John Buggenhagen to ~ Laurie St. Aubin and Mark Chambers, AOGCC Oberon #1 Well file). This conclusion makes reliance on seismic detection of shallow hazards uncertain at best. Our review of available seismic data is described below. We believe that following prudent drilling practices (careful mud volume monitoring; avoiding quick trips out of the shallow hole) based years of North Slope drilling experience, are our best way to minimize this risk. '1!) 1; 4r,c ~r. Sr.,rtefi;)1, ,9ncfio°af;e. ~1lnskr. 995)1 el: 90.'-335>.99fi~ f~i:r 9i%?.339.99f? t~ • • Brooks Range Petroleum Corporation Tofkat-01: a ~uhsidinrrofA~'CG, LI,E" Figure 1 shows the regional base map with all the near by exploration wells. Figure 2 is a zoomed in map showing the Tofkat-1 location along with the nearby 2D seismic data that Brooks Range Petroleum has licensed. Highlighted in red are the two nearest seismic lines to the Tofkat-1 surface location, lines WKE92-07 and SK81-12. Figure 3 shows a very zoomed in view of the Tofkat-1 surface location along with the same two seismic lines and labeled section numbers. Several near by lakes can be seen out lined in blue along with the main channel of the Colville River. Figure 4 shows a migrated full stack display of seismic line WKE92-07 which was recently reprocessed. The vertical static busts in the line relate to the disruption of the ray paths due to shallow lakes in the area. Also shown on the line in Figure 4 is the well tie for the Colville River-1 PB well, as well as the approximate base permafrost seismic pick. A possible shallow bright can be seen at CDP 2560 just below the base of the permafrost. Figure 5 is the relative amplitude display of line WKE92-07. Absent are any apparent '~ shallow bright spots associated with free gas in or below the base of the permafrost in the vicinity of the surface location of Tofkat-1. Figure 6 is the same line with the final migration velocities displayed. The Tofkat-1 surface location is projected onto this display which shows a lowering of the migration velocity in the vicinity of the Colville River crossing. Figure 7 shows the shallow tomographic velocity profile for line WKE92-07 derived by analyzing the first break arrivals on the shot records. The tomographic velocity profile for the first thousand feet of section does show a similar velocity reduction under the Colville River crossing. Figure 8 shows the corresponding tomographic ray path model used to derive the tomographic velocity model shown in Figure 7. Figure 9 shows the migrated full stack display for line SK81-12. No apparent bright spots are detectable in or near the base of the permafrost section. When all the data is reviewed together, there appears to be no apparent shallow / drilling hazard in the vicinity of the Tofkat-1 surface location. Shallow Fault Analysis: No apparent shallow faults are imaged on either of the two seismic lines. ~ 5/!)L.St c~ri, Srtitef!)/,,q~Glt~r«4;z..tki;ka 4V5!1! !`ej 9(I'.239.94fi? ri;x: ~_~?..~S~.>9(1 Tofkat-1 Surface Location Figure 1 Tofkat-1 Area Base Map with Seismic Line Locations Base A~1a4? - ' ...., ~. r _ ~ ~ _ _ .~ . ~ ~: -- -y - _ - J ~ j ~ - ~ -~~ t: ,u .~ I ',S,.; ~t. i ., i < ' ~ ,.:.. t F ~. _.. ,A S-- <.-_ ..ems _ _, .. _ , i ~ .. ~ ~ ~~ ~ _ i ~, ~: ~ ~' '' _.... , ~ ~ ~ - - , ~ ~ + 111 r. ~ '~ i `I -. - '.. r ` ,. , A: ~'4 j f. ~ ~; - ..i-...a - J - ~ ~~ ~ ~ ~ °' e ~~iL, V~ ; ' BRPC Group ~~ 1 ~ '~~ ~' ~ ~ ~ i r-~--1--~----'-' ~.,~ ,~:~, leases shown in i, ~-°~L - ~ _ ~ ~ ~_~~~~=~' . _ i .. yellow. '~ ~ ~ '` ~,~ ~ ~ ~ ~ i c , ~ t _. ~~a,~ _.. _ ~ :~ E u ~~ ,.: u;T, ~ _.._._ ~~ ~ 1 € ~ ~ ° >~ ~ i ~c~'~io t` ' ~ *~\ `o ~~_ ~.~ . .iw~~~ ~ ~ , ~~ ( ._ im ~N006E ~s is. ~s5 u~ ~ -:i _'' ' ~ _ ~ ~ Tofkat-1 S~irface i ~" ' ~ ~ ~_ ~ ~ Location ~ ~~ ~ ~~ ~ -- F,- C.. ~J "163 AL G' ,~ ~., ~] .. ' '~ ' ,. ~ ~~ ~ N _ __ W _ r 0 o- ~_ ,.L COr,_. _. ~l > I -- -- - -- _-- -- Figure 2 BRPC Group leases shown in yellow. Tofkat-1 Base Map with Seismic Line Locations Rase l~la~ ... ~__~ . 3 ~. R , ,~~;-~~ -,- _ ~' ~~ i r___ ~_ _~ _... ... .. _ .. -x. . » . M .. ~ '~~ i ~ f E: e w~ E i ,~c,1~~ _~.~ o~ ~`ti ~`~ :~~~_~~ ~~- ~U 1 { '. _~ i I i Tofkat-1 Surface Location i i n '' ~ i ~. - _ _-~--- ,~` I~ ~, „~~ c ,, ~ .. ~ ~ , ~. ye ~~ •,~ Figure 3 u i sW Seismic Line WKE-92-7 Amplitude Display NE ." Line 4'rKE-42 7 F-E'STia, PSTM ' ^^ ~.. F- _. -_ _ ~ .RCLS.f~ i - o Tofkat-9 To11lC~t-~ SUrfaCe COLVILLE RIVER.-7P8 ~, Projected _. .. -- .,. - ~.~.- .. .- - , ~. .... fir..,.. .. •. N ~..: .. t ~ w r i r .. r • . - rn.. ~~ Ike ~h ~~ V . ,~ ~~se P_ eriiiafrast _ - ~ ~ . ~ ~ : _ _._ - .. ,~_ . __ . _.._-_.v_ -.:.. ~ . .~ _. .~ .~ _. ~ - _ - ,. r ;, H„ ,', ,. _ - ~ _ -_ . . -- - ,~ ~. .. ,, . _ - - µ, z .~ _ ..~.. _ ~ . Potential shallow .. gas bright spot . , ..~. ~ ,~,d,,. «. ,,~..._ g. _ ..Y... -.. ....~- •~ Figure 4 Seismic Line WKE-92-7 Relative Amplitude Display SW NE ..:`. Lme 't`>K.E-~2-? F-PSTt,~, PST}.~ - ' .'1 _ -_ ~_-. - --- rorKac- t ' .<,_- Tnfka4_1 .G ~rf~~P ~. ~ , , , ',-- ~ , .~:, < .: ~ -.,.._ _ ~o~~. i~~e r~w~"- ~~6 H ~hallc ~f spc I ;~ Figure 5 sW Seismic Line WKE-92-7 Migration Velocity Display NE "' Line 1°JKE-~L-i .F-PSTh1, Vziorrty ~ ;~ ._ p' I Tofkat-1 Surface (~~ ti ~ ofkat 7 9 I ~~~~~~ ~~~u Pro ected ~"' Base'P~rmafrost ~' I- 7 I'. ~ COLt+ILLE RI~tEt~- I ~ U a~ 27 i a:~ a,,T~ U ~ i ,, O , ~ rs .. .=r „ Figure 6 Tomography Velocity Field -Line WKE-92-07 ~_ . ~.,~ ..~ _. ~ ~ Ile tvloduL ui~, ,: t~Atrl~ut6 _ _ .-: ._.. `'well F ': ~c 1_. ~. _ ~'.'~i. '. ~ gin; Rrl- "e nth -.. _ _ . _. ~ ___ - ~ ~ .j 7nd15 ~ r,~'.el 'L.:-:~ 1 -. rJ ~ra-~-- .-.1 ~c4 __~ -ear _rr ~i ~_; ',. _ F:~'i_o~i SW i^\ •h-~ ~~ ~^ ~^.`L W Tofkat-1 Sui-face Location ~ ~ ~~ i 1 T y p~ 3 § ~+ z 3 ' K ~ E I ~ j~3 . r ~ ~ ~~ 5 Kr . ~. x F i 3 1 <Y ~ S' '! NE ,= Figure 7 Tomography Ray-Path Model - Line WKE-92-07 f=7 ti: LL s a C Figure 8 File Niod uies Seism i~ .._ .. ,~1 F.. F I ~ ~ - --L =. _ _., ~ 'rooe PIoC~. - L~ _. ,.~ i ~. - rri ~_i-- - Saltmarsh, Arthur C (DOA) Page 1 of 2 From: Bill Penrose [bill@fairweather.com] Sent: Tuesday, January 08, 2008 10:20 AM To: Saltmarsh, Arthur C (DOA); dhastings@brooksrangepetro.com Cc: barmfield@brooksrangepetro.com; Larry Smith Subject: RE: Tofkat #1 Art, Doug will take care of your first question. Here are the answers to No.s 2 and 3: 2. The BHP is expected to be 4,349 psi at TD as indicated in the MASP calculations. I'm at a loss as to how that 7,200 psi got put on the 10-401. 3. The logging program will consist of GR/Res/Neut/Dens in the 8-1/2" hole and a dipole sonic run from TD to '' surface. A checkshot survey will also be run and there's a contingency MDT in the program that depends on the results of the other logs. Regards, ~~ ~+~i~ Vice President f Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Saltmarsh, Arthur C (DOA) [mailto:art.saltmarsh@alaska.gov] Sent: Monday, January 07, 2008 1:32 PM To: dhastings@brooksrangepetro.com Subject: Tofkat #1 Afternoon Doug, I called before the Holidays for some additional info on the Tofkat #1 well, but haven't heard from you. I just got back in the office myself. I'd like to get the PTD done and out, but I need the following: 1- Information on shallow gas hazards over the location. Seismic, etc.; 2- Your BHP is on the PTD as 7200 lbs. Is this correct? Looks high even at those depths. 3- You did not include your logging program. We will require shallow porosity logs for calculating shallow zone salinities. If you can get this information to me in the next day or so, I'll get the PTD out for you. Thanks, Art ~ J'~l'~~.~.~ arc. 90~ ii9i2oos Tofkat #1 & 1A: B.H.L.'s on Lease Map _ .,, , ~F'f~~ ~~ ~ F~ ~ t ~. ~~ ,.. ; ~~~ - ,.- ~, ~' Nth ~ I III _.. .- .5 ~~ _ [~. _ 5 ;_ ,, ~. .. ~~,1 ~`I~ ~~~~ ~~ - ~~`~` ' ~ i f Y ~~ ~~. ~ , I k j t fem. r>~ _ '~T~~ 'r _1~ ~- ,- (i ~- _I a ~ Y ~ ~ 1' t ! rl .t ,~ ~.. ,.- ~ ~.. _ _ _, ~ _ U L s - - l N tit +`_ (~ '} ~frf a^ - __ ~ . ~, ~ ~ ~ T"r ., ~ ,r - ,~ r ~, FLT ',tom Ll :~ r Saltmarsh, Arthur C (DOA) From: Douglas S. Hastings [dhastings@brooksrangepetro.com] Sent: Wednesday, December 19, 2007 11:15 AM To: Saltmarsh, Arthur C (DOA) Cc: Bart Armfield; Larry Smith; George Pollock Subject: Tofkakt#1 (and 1A, we hope) BHLs Attachments: 215547855-Tofkat BHLs on Lease map 12 2007.ppt Art Page 1 of 1 Attached is a lease map with the Toflcat # 1 wellpath -based on this, Tofkat #1 will encounter the LCU in ADL390676 and TD in ADL 391015. These locations are less than 500' from the lease line, but since we own both leases, we won't object. If successful, we plan to sidetrack to Tofkat #lA, which will bottom cleanly in DL390676. Both locations are on 2D seismic lines which we own, which explains why at least one is so close to a lease line. Thanks, Doug 12/ 19/2007 Alaska Department of Natural Resources Land Administration System Page 1 of 2 S ~° . ~:,< _~ .:_ r< .„ ~:,~-_i.. ' ~'~~:; .~rc~~r`s S~arcfa State Cabins ~la~tur~~ i~o~r€~s 1 Sk DN S File Type ADL File Number: 391013 ~ Printable Case Fi(e_Summary See Township, Range, Section and Acreage? ~_~ Yes ~ No New Search t.AS M~±n!~ I Case Abstract I Case Detail I Land Abstract l~~ile: ~UI_, 391013 ~'~''_ Search for Status Plat Updates A~ cal l?/19%~(iO? Custofner: 000038497 AVCG, LLC LAND DEPARTMENT 510 L STREET, SUITE 601 ANCHORAGE AK 99501 Case Tlpe: ~Et4 OIL & GAS LF_,ASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DN OIL AND GAS Case Stutns: 3~ ISSUED Stata~s Date: 09/22/2006 Total Acres: 2560.000 Date hiitiateil: 03/01 /2006 Office ofPrirrra~y Respof~~sibility: DOG DIV OIL AND GAS Lust Transaction Date: 08/09/2007 Case Subtype: t~ NORTH SLOPE Lust Ti~ansaciion: AA-NRB ASSIGNMENT APPROVED Meridia~~.~ l ~ Tnwns~hip: O I ON Rai?fie ~ OOSE Sc~c°tinr ~ ' Ol Sectio~~a Acres; hit?° Search Platy 1Llerr~Ii~~n: l_ 7~~~rn.~~hi~~_ (11l')N Rui~~~r. OOSE ~S'ecti~,n: ~~ SecliorzAcres: h(U tl<~ri~li~m.~ 1 ~ 7~n~rf~shrj~: (1 I ON I~ur~ge: 005E Section: I 1 S'action Acres: 640 ~ti1ef°i~li~nr.~ I_' %~nr~e~hi~~: Ol UN 1~'~~f~ge: 005E Section: I2 S'ectiorz.4cres: 6~0 Legal Description 9/1/2006 xxT `~`'~**~*~" FINAL LEGAL DESCRIPTION'~~'"~ `:.`.*"` ~`**X TRACT NS2006-0919 T. 10 N., R. 5 E., UMIAT MERIDIAN, ALASKA. SECT[ON 1, SURVEYED, BY PROTRACTION. ALL, INCLUDING THE BEDS OF ~fHE UNNAMED LAKES, 640.00 ACRES; SECTION 2, SURVEYED, BY PROTRACTION, ALL, INCLUDING THE BEDS OF THE UNNAMED LAKES, 640.00 ACRES; SECTION I1, SURVEYED, BY PROTRACTIQN, ALL, [NCLUDING THE BEDS OF THE UNNAMED LAKES, 640.00 ACRES, SECTION 12, SURVEYED, BY PROTRACTION, ALL, INCLUDING THE BEDS OF THE UNNAMED LAKF,S, 640.00 ACRES; http://www.dnr. state.ak.us/laslCase_Summary.cfm?FileType=ADL&FileNumber=39101... 12/19/2007 Alaska Department of Natural Resources Land Administration System Page 2 of 2 • • THIS TRACT (NS2006-0919) CONTAINS 2,560.00 ACRES, MORE OR LESS. 9/15/2006 ****ASRC/STATE ACREAGES*******'~*'~*******************~`* IN ACCORDANCE WITH THE 1991 STATE/ASRC SETTLEMENT AGREEMENT TOWNSHIP T. 10 N., R. 5 E., UMIAT MERIDIAN, ALASKA. SEC. ACRES STATE% ASRC% STATE ACRES ASRC ACRES 1 640.00 57.45 42.55 367.68 272.32 2 640.00 63.30 36.70 405.12 234.88 11 640.00 57.39 42.61 367.30 272.70 12 640.00 50.25 49.75 321.60 318.40 TOTAL 2560.00 57.10 42.90 1461.70 1098.30 of ~' Last updated on 12/19/2007. Not sure who to contact? Have a question about DNR? Visit the Public Il~farrr~a~on Center. Report technical problems with this page to the ~brn~st~r. Site optimized for Netscape 7, IE 6 or above. This site also requires that all C14~ must be accepted. State afA[aska Natural Resources IBS Home Copyright Privacy System status http://www. dnr. state. ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=39101... 12/ 19/2007 .Alaska Department of Natural Resources Land Administration System .;. ~,_ .~ «;a ~..: ~.~~ ~~ ~ ~r, t ..... ' _~ _~~ " pis '- ecard~r`s Search State Cabins Page 1 of 2 ~i~#ur~ urns __. __ . Alaska DNR base Summary File Type: ADL File Number: 390676 ~ printable Case File_Summary See Township, Range, Section and Acreage? New Search y~ ~ Yes ~ No ~- ---~-- LAS Menu ~ Case Abstract I Case Detail ~ Land Abstract T~. Filc: ADL 390676 "~'~ Search far Status Plat Up~atcs ,~ cif I?'I9%~'l)0~' Customer: 000038497 AVCG, LLC LAND DEPARTMENT 510 L STREET, SUITE 601 ANCFIORAGE AK 99501 Case Type: ~`~~ O1L & GAS LEASE COMP DNR Ui7it: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Statats: 35 ISSUED Stata~s Date: 07/19/2005 Total ACY'eS: 192,0.000 Date InltlateC~'.' 10/27/2004 Office ofPrirrta~y Responsibility : DOG D1V OIL AND GAS Lasl Transaction Date: 08/09/2007 Cure Stcbtype : S NORTH SLOPE Lusl Transaction: AA-NKB ASSIGNMENT APPROVED Lk~ri~/i~n~. [1 Totivnship: OlON Range: 005E Section: 15 Section Acres: 640 parch ~~7t5 t(<~ri<Iinn.~ I 7oti~~nship: OION l~un~~r: 005E 5~~~~~liu,t.~ ' 1 Secli~~n .9~~r~~~: (CIO /lley'ic~'Icrn.~ I , To~~nsbip: O1ON 1~ur~ge: 005E S~~c~I~~n: ~' Secli~~rt .~I~rc~~~~ (~~lU Legal Description 0~-27-200 *'' *~`*~~'*****~**F1NAL LEGAL DESCKIPTION ******~******** TRACT NS2004-0923 T. IO N., R 5 E., UMIAT MERIDIAN, ALASKA. SECTION 15, SURVEYED, BY PROTRACTION, ALL INCLUDING ~1'HE BEDS OF THE COLVILLE RIVER AND ~hHE UNIv1AMED WATERBODY, 640.00 ACRES; SECTION 21, SURVEYED, BY PROTRACTION, ALL INCLUDING THE BED OF THE COLVLLLE RIVER AND THE NECHELIK CHANNEL, 640.00 ACRES: SECTION 22, SURVEYED, BY PROTRACTION, ALL 1NCLUDING THE BED OF THE COLVILLE RIVER. 640.00 ACRES; THIS TRACT (NS2004-0923). CONTAINS 1,920.00 ACRES, MORE OR LESS. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=39067... 12/19/2007 .Alaska Department of Natural Resources Land Administration System Page 2 of 2 • 5/27/2005 *****ASRC/STATE ACREAGES******************************* IN ACCORDANCE WITH THE 1991 STATE/ASRC SETTLEMENT AGREEMENT TOWNSHIP T. 10 N., R. 5 E., UMIAT MERIDIAN, ALASKA. SEC. ACRES STATE% ASRC% STATE ACRES ASRC ACRES 15 640.00 82.00 18.00 524.80 115.20 21 640.00 56.38 43.62 360.83 279.17 22 640.00 73.39 26.61 469.70 170.30 TOTAL 1920.00 70.59 29.41 1355.33 564.67 ~n~1 of ~ary Last updated on 12/19/2007. Not sure who to contact? Have a question about DNR? Visit the l~~.ilic Iforrn~tan ~car~t~r. Report technical problems with this page to the ~~li~r~asr. Site optimized for Netscape 7, IE 6 or above. This site also requires that all QIS must be accepted. State of_Aiaska Nat:~rai_Reso~arces LAS Home Copyright Privacy System Status http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=39067... 12/19/2007 . Alaska Department of Natural Resources Land Administration System Page 1 of 2 .. ~~~:,~ ..c+ ~,, F~~~-''_ ~corci~r`s S¢a~~ch State Gabins [~ivl~~ S+DUf'~S __ Alaska DNR Case Summary File Type. ADL File Number: 391015 ' ~ Printable Case i=iie_Summary See Township, Range, Section and Acreage? ~' Yes C3 No _ _ New".Search W..J SAS l~lent' ~ Case Abstract ~ Case Detail ~ Land Abstract file: .aDL 391111 ~ '''~'~ Searci~ fnr Status Plat Updates 1~~f f? 1~~-2007 Czrsto~~zer: 000038497 AVCG, LLC LAND DEPARTMENT 510 L STREET, SUITE 601 ANCHORAGE AK 99501 Case Ti-pe: ~~x OlL & GAS LEASE COMP D_NR Urait: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS CaseStatus: 35 ISSUED .Stan~s Date: 09/22/2006 Total~lcj~es: 640.000 Date Initiated': 03/01/2006 Office of Primury>Res~onsibility: DOG DIV OIL AND GAS Last Transaction Date: 08/09/2007 C'a,ec Sublvpe: -~ NORTH SLOPE Last Trurzsaction: AA-NRB ASSIGNMENT APPROVED Ntericliaiz: U ~nti~~nshi~: 010N Range.' ' 005E rc~ctinn ~ 1 F Section Acres: 640 ~~:~rch PIa4~ Legal Descrii~tion 9/1/2006 x.r********~~FINAL LEGAL DESCRIPTION~:;,x*:~~:r~:r~:~~ TRACT NS2006-0923 T. 10 N., R. 5 E., UMIAT MERIDIAN, ALASKA. SECTION 16, SURVEYED, BY PROTRACTION. ALL EXCLUDING U.S. SURVEY 9121, 580.32 ACRES; SPECIAL SURVEYS U.S. SURVEY 9121, "hHAT PORTION WITHIN SECTION 16, 59.68 ACRES; THIS '('RACY ~NS2006-0923) CONTAINS 640.00 ACRES, MORE OR LESS. 9/1.5/2006 ~~*~=~ASRC!STA1~E ACREAGES`"f:~r:r-~~:~*a:,_:";:;;:~;;,:4;f:;1_~~~:~,=:*:~>;<";~~:~~: IN ACCORDANCE WITH THE 1991 STATE/ASRC SETTLEMEN~h AGREEMENT TOWNSHIP http://www. dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber =39101... 12/ 19/2007 • _ Alaska Department of Natural Resources Land Administration System Page 2 of 2 T. 10 N., R ~ E.. UMIAT MERIDIAN, ALASKA. SEC. ACRES STATE% ASRC% STATE ACRES ASRC ACRES 16 640.00 58.57 41.43 74.68 288.38 TOTAL 640.00 58.57 X1.43 74.68 288.38 n~ ~ case ~i~airy Last updated on 12/19/2007. Not sure who to contact? Have a question about DNR? Visit the ?~lic In~orri.. `s ~entr. Report technical problems with this page to the 4~J~1~€nstc~r. Site optimized for Netscape 7, IE 6 or above. This site also requires that all flC~tF_ s must be accepted. State a#~liaska Natural Resources LAS Home Copyright Prvacy System_Status http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=39101... 12/19/2007 • • TRANSMITTAL LETTER CHECKLIST WELL NAME ~of'~AT .~f PTD# ~D~/,~30 Development Service / Exploratory Stratigraphic Test Non-Conventional WeU Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing wel! (If last two digits in permit No. , API No. 50- API number are between 60-69) Production should continue to be reported as a function of the original API number stated abovc. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data aad togs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - _~ from records, data and logs acquired for wetl SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. , assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or v from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after (Comdr x Name) has designed and implemented a water wet! testing program to provide baseline data on water quality and quantity. SCompany Name) must contact the Commission to obtain advance approval of such water well testing ro am. Rev: 7/13/'2007 WELL PERMIT CHECKLIST Field & Pool __ _ Well Name: TOFKAT? Program EXP__ Well bore seg ^ PTD#:2071730 Company BROOKS RANGE PETROLEUM Initial ClasslType EXP t PEND _ GeoArea 890 _ Unit 00000 _ On1Off Share On Annular Disposal ^ Administration 1 Pe[mitfee attached- NA- 2 Lease number appropriate_ Yes Additions to 401: Surface location- in ADL 391013, well passes-thru ADL 391.014,_potentialpay inADL 390676, 3 Unique well-name and number----------------------------- --------- Yes__- --_TDinADL391015.-SFD 1117/2008____-__----..__. ------------------------------- 4 Well located in_a defined-pool- _ - _ - No_ - Ex lorato p ry - - 5 Well located proper distance from drilling unit_boundary_ Yes - - ?1 mile_from bounda_ry_ofAVCG/Brook Rznge_Petroleum Leases.-SFD 1!17!2008 6 Well located proper distance from other wells_ Yes Nearest well is Oberon #1, about 6 miles to the east._ SFD 1/17/2008 7 Sufficient acreage_ayail_able in.drilling unit_ Yes - 8 If deviated, is wellbore plat included Yes . - . - Revised directional-surve rov_ided 1!1612008. SFD_1117/2008 YR 9 Ope[atoronlyaffectedparty--- - -- ------------ ------- --------- Yes- -- ..--- ------ 10 Ope[atorhas_appropriate-bond in force--_-__---__--__-______ _________Yes--__ _--Blanket Bond#LPM8842179_--_-__..-_..__..---___---..--.....-_-_-_-----.- 11 Permit_canbeissuedwithoutconservationorder_______ ___________ _________ Yes___- _--.-.-________ Appr Date 12 Permit can be issued without administrative approval________________ ________ Yes____ _______--._-________----------__--__----.. ---_--_ SFD 1/17!2008 13 Can permit be approved before 15-day wait Yes 14 Well located within area and_strata authorized by-Injection Order # (puk 10# in-comments)_ (For. NA_ _ . 15 Allwells_within1/4-mile area-ofreyiewidentifed(Forservieewellonly)______ _________ NA___-_ -_-_--__-_____--__--__--___-_. 16 P-re-produced injector: dpration of pre-production less than_ 3 months_ (For-serui_ce well only} - - NA- - _ _ _ _ _ _ _ 17 N_onconven, gas conforms to A$31,05,030Q.1_.A),(~.2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ _ Engineering 18 Conductor stringprovided _ _ _ . _ - .. Yes _ _ _ _ _ _ _ - 19 Surface casingproteets all_known U$DWs -- - - - - - - - - - - - - - - NA- No known USDWs in area. Surface_easing planned @ 3000' tvd: - 20 _C_MT vol adequate_to circulate-on conductor & surf csg - _ Yes .. - - - 2t CMT-v_ol_ adequate_to tie-in long string to_surf csg _ - - _ - _ _ _ _ _ _ _ NA- _ _ _ _ No production casing planned. _ Hole section tq be plugged. _ _ _ 22 _C_MT_will cover-all know_n_pro_ductive horizons_ Yes Identified hydrocarbon zones will_be_isolated_b I_u in . Yp99g - 23 -Casing des~ns adequate for C,-T, B & permaf[ost_ _ _ _ Yes _ _ - _ _ _ 24 _A_dequate tankage_or reserve pit Yes Rig equipped with steel pits: No reserve pit plann_ed._ All waste-to approved disposal well(s), 25 If_a_re-drill, has_a 10-403 for abandonment been app_roved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ NA_ _ _ _ ... - - - - - - _ - - ~~ 26 Adequalewellboreseparation_proposed________________________ _________Yes_.-_ _--Nearest well-6 miles distant._-_-_--__-__-__--___-__-___----._--_--_ 27 If_diverter required, does it meet regulations_ Yes Appr Date 28 Drilling fluid- program schematic-& equipJist_adequate - - - - Yes - - - ..Maximum expected formation pressure_10.2 EMW.. Planned MW up to 10.7 ppg. TEM 1!1712008 29 BOPEs, do the meet regulation _ Y Yes _ _ - _ - - - - - - . . %~~ 30 BOPE_press rating appropriate; test to (put psig mcomments)- - - - Yes MASP calculated at 3447 psi. 5000_psi BOP test_planned, ,31 Choke_manifold complies w/APl_ RP-53 (May 84)_ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas prgbable No- - HZS has not_ been seen in area. -Rig equipped withsenso[s_and al_a[ms, ---------------- 34 Mechanical_condition of wells within AOR verified (For service well only) NA Geology 35 Permit can be issued w/o hydrogen sulfide measures Yes - - H2S measures will be used as a precaution. X1,36 Data_presented on potential overpressure zones Yes - Expected r_eservoir_pre_ssure is 10.2ppg EMW;will be drilled with 9,5_-_10.7-ppg mud. sfd 1117108- - Appr Date ~37 Seismic analysis of shallow gas_zones Yes No apparentshallow faults or_othet drilling hazard_ inidcators are visible in the limited 2D seismic near well --- SFD 1!17!2008 38 Seabed conditionsurvey_(ifoff-shore) ----- --- -.- -VA-- -- - -- -- ---------- --- ------------- --- ---- 39 Contact game/phone for weekly_progress reports [exploratory only] - Yes Bill Penrose - 258-3446- . - - Geologic Date: Engineering Date blic ' Date Mutl log required. Minimum openhole well log suite of GRlresistivitylsonic or density required from base conductor to TD to Commissioner: oner Commissioner: om allow evaluation of shallow water salinity. SFD 1117!2008 1 /~ ~ ~~ ~-~~-o~ • • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Welt Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry Drilling Services Brooks Range Petroleum Corporation Tofkat 1, Tofkat 1A, and Tofkat 1 B Surface Data Logging END OF WELL REPORT Brooks Range Petroleum TABLE OF CONTENTS TOFKAT 1, 1A, and 1 B. Tofkat 1 Tofkat 1 A Tofkat 1 B 1. General Information 2. Daily Summary A. Bit Reports B. Mud Reports C. Show Reports 3. Lithology Summary A. Tops. B. Logs C. Tops. D. Logs E. Tops F. Logs 4. DATA CD. 5. Morning Report Brooks Range Petroleum Sperry Drilling Services GENERAL WELL INFORMATION TOFKAT 1 Company: Brooks Range Petroleum Corporation Rig: Nabors 27E Well: Toflcat 1 Field: Exploration Borough: North Slope State: Alaska Country: United States API Number: 50-103-20567-00 Sperry-Sun Job Number: AK-AM-0005672885 Job Start Date: FEB 08 2008 Job End Date (TD): March 18 2008 Total Depth: TD 13174' MD; 7708' TVD North Reference: True Declination: 22.30° Dip Angle: 80.64° Total Field Strength: 1151.50 NT Date Of Magnetic Data: 16 Feb 2008 Wellhead Coordinates N: North 70° 13' 48.186" Wellhead Coordinates W: West 150° 47' 20.701 " RKB: 33' Ground Elevation: 19.80321' SDL Engineers: Steven Jenkins; Ian Johnstone, Ed Jones Company Geologist: Doug Hastings SSDS Unit Number: 115 Sperry Drilling Services GENERAL WELL INFORMATION TOFKAT1A Company: Rig: Well: Field: Borough: State: Country: API Number: Sperry-Sun Job Number: Job Start Date: Job End Date (TD): Total Depth: North Reference: Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W: RKB: Ground Elevation: SDL Engineers: Company Geologist: SSDS Unit Number: ~ ro O acs Brooks Range Petroleum Corporation Nabors 27E Tofkat 1 A Exploration North Slope Alaska United States 50-103-20567-01 AK-AM-0005672885 March 19 2008 March 26, 2008 TD 11298' MD; 7169' TVD True 22.30° 80.64° 1151.50 NT 16 Feb 2008 North 70° 13' 48.186" West 150° 47' 20.701 " 33' 19.80321' Steven Jenkins, Ed Jones Doug Hastings 115 !~~ ~~~ ~~tr'Ol~u ~ Sperry Drilling Services GENERAL WELL INFORMATION TOFKAT1B Company: Rig: Well: Field: Borough: State: Country: API Number: Sperry-Sun Job Number: Job Start Date: Job End Date (TD): Total Depth: North Reference: Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W RKB: Ground Elevation: SDL Engineers: Company Geologist: Brooks Range Petroleum Corporation Nabors 27E Tofkat 1 B Exploration North Slope Alaska United States 50-103-20567-02 AK-AM-0005672885 March 27 2008 April 10 , 2008 TD 15575' MD; 7199.46' TVD True 22.30° 80.64° 1151.50 NT 16 Feb 2008 North 70° 13' 48.186" West 150° 47' 20.701 " 33' 19.80321' Steven Jenkins, Ed Jones Doug Hastings SSDS Unit Number: 115 Sperry Drilling Services DAILY SUMMARY Brooks Range Petroleum Corporation Totkat 1, Totkat lA, and Tofkat 1B 2_ DAILY SUMMARY TOFKAT 1 12 Feb 2008 Cont to rig up to spud. Picked up 129 joints of drill pipe. Clear rig floor, P/U BHA.RIH and tag bottom of conductor and started drilling. Drilled 300', POOH to P/U jars and heavy wall. RIH and drill to 826 feet. 13 Feb 2008 Drilled to 1204' POH to 180' and monitored well. Hole in good condition. RIH washing down last 95' with 2' fill on bottom. Drilled ahead and 50 to 150 feet/hr. ROP. Drilled to 2059' sliding 30 to 40' per stand and rotating the rest. ROP slowed, so two NutPlug sweeps were run with little or no ROP improvement seen. 14 Feb 2008 Drill 2059' to 2166' ~ 50 to 150 ft/hr. Circ. B/U. POH to 1011'. Good displacement No problems. Monitored well. Static. POH to 89.19' and racked back. No problems. Mud caked on stabilizers, tools and bit. Bit was damaged. Cleaned BHA. RIH new bit to 275'. Serviced top drive. RIH to 2070' then WTB with no fill. Drilled to 2557' with initial ROP C 30 to 70 ftlhr in clays 15 Feb 2008 Drilled to TD surface hole interval and 3910'. Circ. B/U. B/U and 3900' should be 5050 strokes at gauge hole or 5600 strokes at the 10% over gauge factored in for whole volumes to date. 16 Feb 2008 Short trip from interval TD of 3910.4' up to 2100'. Hole in good shape. Swept hole with NutPlug to try and gauge enlargement unsuccessfully as NutPlug arrived 200 strokes early;(Probably channeled along high side of pipe)? Pumped dry job and POOH. L/D BHA. Rigged to run 9 5/8" casing. Started to RIH with casing. 17 Feb 2008 Casing ran smoothly. Landed it at 3897 feetMD;(3026.7 feet TVD) with no problem. Cemented. Waiting on cement. Cleaned pits to get ready for oil mud section. 18 Feb 2008 Waiting on cement. 19 Feb 2008 Pressure test & nipple up BOP's. M/U test joint & set test plug. Make up BHA &RIH to tag cement ~ 3805'. Set down 10K. Drill cement to 3812' &circ. B/U. Test 9 5/8 casing with 3000 psi for 10 minutes. Good Test. Drill float collar & cement to 3840 feetMD. 20 Feb 2008 Drilling cement & shoe ~ 3897' and open hole to 3911'. Circ. mud & pump 25 bbl spacer followed by oil mud. Circulate. Pump dry job & POH for smart tools. P/U & load BHA. Load nukes into tool. RIH with DC & HWDP to 1053'. Test MWD tool. Blow down Top-drive. P/U singles of DP to 3894'. Drill to 3931'. Circ. B/U ~ 500 gpm and 3800 psi. Leak off test. Formation leak off (~ 820 psi=15.3 PPG EMW. 21 Feb Drilled to 4898'[440 gpm ~ 3800 psi; 2-10K WOB. Rotating wt=100K]. Circ. B/U for trip to shoe. No trip problems. Drilled to 5860';[up wt. 145K:dwn wt.100K:Rot wt. 115K:WOB=8-12]. Circ.460 gpm X3680 off btm; 3950 on btm; Circ. 1.5 x B/U. POH to 4897'. Tight out ~ 5250,5080,4900. RIH to 5860' WTB f/5760'. No problems. (1000 units connection gas ~ 6000' after trip). 22 Feb Drill f/6100-6822'. Circ.C~3 455 gpm (~ 3890 psi off btm & 4050 psi on btm. Pump sweep. POH tight C~ 6305'. Work up to 6250' pulling 50K over.Break circ. & POH to 6147'. Evidence of packing off. RIH to btm &circ. 90 minutes. POH. Tight ~ 6110' but worked through it. Monitored well ~ 5764'. RIH to btm with no problem. Drilled to 7785'.Circ.C~ 445 gpm ~ 3880 psi off btm & 4100 psi on btm. ROP=200-250'/hr. DAILY SUMMARY Brooks Range Totkat 1,Tofkat 1 A, and Tofkat 1B 23 Feb Circ. sweep. & 3 B/U. Pump dry job. POH to 6053' with tight spots worked easily, though tight @ 6250'MD. RIH to btm with no problem washing 100'. No fill. Drill to 8747'; [Torque on 6- 7K/off 5-6K;up wt 190K:dwn wt. 110K:Rotating wt. 135K:445 gpmC~3880 psi]. Circ. sweep. POH to 7688'; 20-30K drag after 8100'.Work & comes slick.RlH with no problem. Drilled to 8940'. 24 Feb Drilled to 10,092';(WOB 8-10K,TQ on 8K,T0 off 6-7K,420 gpm ~ 3900 psi,Up wt. 225K,Down wt. 150K,Rotating wt. 120K.Circ. sweep C~3 430 gpm C~3 4000 psi. POH to 8450' laying down 4" DP. Working tight @ 8450' pulled 30,000 over to free. Continue POH. [ROP average =142.29] 25 Feb POH tight C 8743'[up wt. 195K:dwn wt. 110K]. POH f/8459 to 7200' but pipe wet. Pump dry job. POH. Tight f/6300 to 6000'. Pipe wet. Circ. out pills with 4000 strokes. POH to 1000' using SuperSucker to clean OBM from joints and working pipe to keep slug falling. UD HWDP & jars. Remove nuclear source. 26 Feb Completed laying down all 4" drill pipe. Clear/clean rig floor. Rack and talley 5" drill pipe. RIH picking up 111 joints 5" drill pipe. POH, standing back 5" drill pipe in the derrick. Test BOP. No fluid treatments today. Hole taking proper fill while laying down and picking up drill pipe. No losses. 27 Feb Finish testing BOP, Koomey test OK. Pull test plug set, wear bush lock down, blow down choke and kill line, PU BHA, circulate to check MWD tools, RIH w/5" DP, circulated at the shoe, cut and slip drill line, service top drive, cont. RIH. Monitoring while tripping back in the hole with 5" DP. 28 Feb Cont RIH w/ 5" DP, circulate and condition tight hole, PU 5" to 7815', circulate, PU 5" DP to 8625', circulate, PU 5" DP to 8761', Cont RIH, wash and ream, drill ahead from 10092' to 10603'. Monitoring while tripping back in the hole with 5" DP. Running centrifuges at all times while drilling and circulating to maintain proper weight. Encountered many "sticky" spots while running in, especially around 6000'-6300'. Circulating in these spots brings sand across the shakers. 29 Feb Drilling ahead, circulate to clean hole, short trip of 11 stands, break circulation, ream last stand, continue drilling ahead, swab out of #1 mud pump, rotate and slide. Running centrifuges as needed while drilling. 243 bbls of fluid lost yesterday, built some fluid on the rig and ordered 290 bbls f/mud plant to make it to TD w/sufficient volume of fluid in the pits. 1 Mar Cont drilling ahead to 12050', circulate BU for short trip, continue drilling to 12415', rot and slide to 12630', control drill to 12698', clean suction screens both pumps, continue drilling ahead to 12794', change swab and pulsation dampners in pumps. Maintain volume, weight, and rheological properties specified in the well program. Centrifuge's have been down due to mechanical problems. No reported losses to the formation. 2 Mar Circulating while working on #2 pump to change pulsation dampner and swabs. Trouble shoot MWD tool, MAD Pass, control drilling, 12793' to 13174'. Circulate and pumped a Hi Vis Weighted sweep. Observed well. Pumped a dry job, short trip, circulate 3 BU, observed the well. Pumped a dry job, and POOH. Pumped a 20 Bbl Hi Vis Weighted sweep. Circulated 3 BU for cleaning hole. Pumped 20 Bbl dry job, and POOH. No reported losses to the formation. 3 Mar POOH, UD BHA, RU wire line scheves, PU logging tools, RU to log the well. No losses to the formation while tripping out of the hole, The well is TD'd at 13,174'. The rig crew is currently working on the mud pumps and will be performing maintenance and repair on the equipment in the pits over the next few days as the well is logged. DAILY SUMMARY Brooks Range Tofkat 1,Tofkat 1 A, and Tofkat 1B 4 Mar Logging Well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. 5 Mar Logging Well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Prepared two dry jobs for POOH while logging Monitoring the well for gas while logging well. 6 Mar Logging the well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Ordered additional mud products in preparation for drilling the sidetrack. MI Wate used for dry jobs. Centrifuged pits 3-7 until desired mud weight was achieved. Monitoring the well for gas. 7 Mar Logging Weli from 10,000' to TD on drill pipe. Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Centrifuge's up and running, processing fluid as circulating allows to maintain 10.7 ppg mud. Centrifuge #2 had a broken dial and bent trigger which was repaired by the rig electrician. Prepared a dry job. Monitoring the well for Gas. 8 Mar Logged from 10,100' to TD and back. POOH to remove the side entry sub from the string. Ran back in to 12,100' and circulated 8,100 strokes to condition mud. Built a 20 bbl dry job weighing 12.7 ppg and pumped it before tripping out of the hole. Stopped POOH at 4752' to slip and cut drilling line. After sonic logging was completed, the crew pulled the side entry sub out of the string and ran back to 12,100' and circulated 8000 strokes, or one complete surface to surface volume. The mud weight is now 10.7-10.8ppg all the way around. The centrifuge ran flawlessly the entire time. MI Wate used to make a 20 bbl dry job weighing 12.7ppg. 9 Mar Cont cut and slip drilling line, POOH, LD logging tools, PU logging tools, RIH, every ten stands pumping 3 bpm for a total of ten barrels each time. At 10,189', stopped and circulated drill pipe volume per Schlumberger. MDT logging. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Monitoring well for gas. 10 Mar Cont MDT logging to 11963, POOH to 11100, cont logging to 10189, Built dry job to POOH. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Built a 2 ppb over dry job to POOH. 11 Mar Gathering MDT log's on drill pipe all day. Monitoring the well for gas. 12 Mar Logged with Schlumberger. Tested BOP's. RIH with 2 7/8" stinger tubing on end of drill- pipe to begin cementing plugs. Circ. B/U halfway in. Will RIH to 12,350 feet and spot 25 bbl. viscous HRP pill by pumping 2335 strokes to clear pill through mule shoe, then slowly pull up to 12,050 feet and circulate prior to cementing Stage 1 plug. 13 Mar RIH f/6146' to 12350' with no problems. Circ. B/U C~ spotted 25 bbl. viscous pill. POH to 12044' & rigged up cementers while circulating/conditioning mud. Placed two 82 bbl. cement plugs. Circ. B/U before pumping dry job & POH. Dry job unsuccessful. POH 'wet' from 9853'. Pumped 2nd dry job. Unsuccessful. POH 'wet'. Pumped viscous OBM/HRP pill. Added M-I Wate for two dry jobs. 14 Mar POH 'wet' f/3859'. UD 2 7/8" pipe;(lots of cement on pipe). M/U clean out BHA &RIH tagging cement ~ 9950'. Set down with 20K weight. Circ. hole clean. POH to 845';(hole in good shape). Change out BHA to cement stinger on 2 7/8" drill-pipe. Prepare to RIH to spot 25 bbl. viscous pill and 46 bbl. cement plug. DAILY SUMMARY Brooks Range Totkat 1,Totkat 1 A, and Tofkat 1B Added M-I Wate for two dry jobs. No other treatment today. Plan Forward: Will RIH to 6660' and spot 25 bbl, viscous pill using 1326 total strokes. Will POH to 6360', and then circulate B/U of 3318 strokes. Halliburton will cement isolation plug from 6360' up to 5860'. 15 Mar RIH & spot high-viscosity pill @ 6660'. POH to 6360 & rig up cementers. Pump 15 bbl spacer; 46 bbl. 15.8 ppg cement; & chase with 15 bbl. spacer. Spotted cement C~ 6360'. POH to 5383' & circulate hole clean. Pumped dry job. POH & P/U polishing assembly. RIH to 5695'. 16 Mar Wash down looking for cement plug f/5695'-6550'. No indication? Circ. & clean hole. Green cement @ B/U. Pump dry job & POH. Change BHA to cementing stinger. RIH to 6660'. Spot 15 bbl. viscous pill. POH to 6360'. Circ. hole clean. Pump 15 bbl spacer; then 51 bbl. cement; then 5 bbl spacer; then rig mud. 89 bbl. total displacement. M-I Wate used for dry job. No otherr treatment today. 17 Mar POH. Rig Service & Slip & Cut for 2.5 hrs. UD cementing BHA & P/U polishing BHA. RIH to 5300'. Wash down 586' looking for cement;[none found]. Circ. & condition mud. WOC. Wash down to tag firm cement C~ 6153'. Circ. B/U. Pump dry job & POH. 18 Mar Contunue to POH & UD cement polishing BHA. P/U cementing BHA. RIH to 6065' & WASH TO 6146'. Circulate while rigging up cementers. Top cement isolation plug. POH to 5194'. Drop ball & circulate DP volume. POH to 4718'. Spot 25 bbl. viscous pill C 4718'. POH to 4400'. Rig in cementers and cement shoe plug. POH to 3450'. Drop DP wiper ball & circulate. Pump dry job & POH. Added M-I Wate for dry job, and added 20 Citric Acid to cement rinsate vacuum tanker to lower pH to 10.5 for acceptance at Class I Pad 3 Disposal facility. Tofkat 1 A 19 Mar Side track well TOFKAT 1 A . POH f/3450'-1053' & UD 2 7/8" DP. Pull wear ring. M/U test joint. Install test plug. Test BOP's. Load nuclear source in smart tools & orient tools before RIH. 20 Mar Make up BHA &RIH. Shallow test tools. Okay. RIH to 3684 & wash in to 4447' to try & tag cement;(not found). Circulate to balance mud. Pump dry job & POH. Lay down smart tools. P/U cementing stinger assembly &RIH to 4587'. Circulate clean. Spot a 25 bbl. 16 ppg viscous spacer. POH to 4302 & cement with 15 bbl. spacer; 26 bbl. 15.8 ppg cement; & chase with 5 bbl. spacer and rig mud. POH to 3350'. Circulate 2 x B/U. Pump dry job & POH. 21 Mar POH F/3350' & UD cementing BHA & 2 7/8 DP. M/U smart BHA & load source. RIH to 1120'; shallow test tools, then WOC. RIH to 3589' & wash to 3970'. Direction work f/3940'-3970'. Time drill to 4732'MD / 3464' TVD; [ 550 gpm @ 2600 psi; Tq on 5-6K; Tq off 4-5K; Up wt. 140K; Down wt. 115K; Rotary wt. 110K]. 22 Mar Circ. B/U before short trip out to shoe. Some swab noted f/4447-4225'. Work pipe thru okay to 3875'. Orient tools. RIH washing/reaming last stand to btm. Drilled to 5780' backreaming twice. POH to 5494'. Hole in good shape. RIH with no problem. Drill with one pump to 6067'. 23 Mar Rotatelslide f/6,066-6732'. Circ. B/U. Monitor well. Pump dry job. POH to 4,700'. RIH to 6,542' & wash/ream to btm. Drill to 7,715'. [540 gpm @ 2950 psi; up wt. 190K,dwn wt. 125K, rot. wt. 145K; Tq on 7-8K,Tq off 5-6K. 24 Mar Monitor well. Short trip f/7778-7497'. Hole was slick. Reamed last stand in to 7778' and oriented tools. Slide & rotate to 8630'. Drilled to 8726'. Circ. hole clean. Pump dry job. POH to 6454'. First 1000' 15 to 30 K overpull. Clean. Rest went well. RIH to 8630'. Wash & ream to btm. Drill to 9366';[530 gpm@2800psi;Tq on 10-11K;Tq off 8-9K; Up wt. 225K; dwn wt. 135K; rot. wt. 160K]. 4 DAILY SUMMARY Brooks Range Tofkat 1, Totkat lA, and Tofkat 1B 25 Mar Rotate and slide from 9366' to 10536'. Drill ahead to TD 11297'. Back ream stand, MWD working with tool, MWD survey, Circulated 2+ BU until hole was clean. Observed the well, pumped a 20 Bbl Dry job, POOH from 11297' to 8345'. RIH with BOP test. 26 Mar Cont POOH, LD BHA, Test BOPE, RIH to 3750', Slip and Cut drilling line. TOFKATIB 27 Mar Cont servicing the rig, TIH, wash and recipricate, displace well to WBM, POOH, circulated to condition mud. A total of 870 bbis were recovered from the well bore and are currently on location. 28 Mar Cont to condition mud, pump a dry job, POOH, rig up for 2 7/8 tubing, RIH, circulated and spotted the weighted vicuous pill, rig up for cement job, set cement plug, POOH, LD drill pipe, rig down 2 7/8 tubing, waiting for the cement to dry. Prepared for the cement plug job. Built a 25 Bbl, weighted (15.8) viscuous pill. Built a 20 Bbl dry job to POOH. Preparing for the WBM displacement. New well/sidetrack starts tomorrow. 29 Mar TIH, tagged hard cement at 3595'. Displaced 10.0 ppg WBM with 10.0 ppg OBM. Test BOPE. PU BHA, RIH. Ran in the hole to top of cement, it held 20k in compression, everything OK. Displaced well to OBM that was recycled from last well. Pumped a High Vis 50 bbl WBM pill, followed by a 50 bbl high vis OBM pill. Then it was chased around by 870 bbls of OBM that we saved on location. Pits 1, 2, and the pill were cleaned prior to taking on remainder of OBM as they had been contaminated w/WBM. LVT brought out to store in pit 1. 30 Mar Pickup ghost reamer, test WMD tools, TIH, Drill ahead, Circulate 1 BU, pump dry job, short trip. Treating and maintaining the OBM with LVT, VersaWet, VersaCoat, Lime, IMG-400, and CaCI. Running centrifuges continuously while drilling ahead. Driller circulated 1 BU at 5500'. Built a dry job, and POOH for a short trip. 31 Mar Cont short trip, service top drive, TIH, circulate to clean the hole, rotate and slide to 7697'. Maintaining the OBM with LVT, VersaWet, VersaCoat, Lime, IMG-400, Versatrol, Soltex, and CaCI. Running centrifuges continuously while drilling ahead. After short trip, the hole unloaded. At 6,330' and 7,100' a 25 bbl Hi Vis sweep was pumped with excellent results as torque and drag decreased after. Pumped a 25 Bbl Hi Vis sweep at 7350' with a medium return of cuttings. Cost reflects 290 Bbls of new OBM and 150 Bbls of new LVT. 1 April Cont. drilling ahead, pumped 25 Bbls Hi Vis sweep, short trip, drilled ahead, pumped 25 Bbls Hi Vis sweep to clean hole, drilling ahead. Drill into the Glannik. 2 April Drilled ahead, pumped 25 Bbl Hi Vis sweeps at 9000' and 9500', short tripped, drilled ahead, pumped 25 Bbis Hi Vis sweeps at 10,000' and 10,500'. Drilled ahead. Experienced fluid losses of approx 25 Bbls per hour. Pumped 50 Bbl LCM Pili, monitoring the well. 3 April Cont monitoring well. Adding LCM to mud due to last night's fluid losses. Drilled ahead. Pumped a 25 bbl Hi Vis Sweep w/ LCM at 11,059'. Short trip to 9492'. Drilled ahead. Pumped another 25 Bbl Hi Vis sweep at 11,875'. Drilled ahead to 12,142'. 5 DAILY SUMMARY Brooks Range Tofkat 1,Totkat 1 A, and Tofkat 1B 4 April Drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead, circulated another 25 Bbl Hi Vis sweep @ 13,200', short tripped, serviced blocks, PU drill pipe, TIH, drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead to 13,581'. 5 April Drilled ahead, POH to rebuild wash pipe, RIH, Drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead to 14814'. Centrifuges down since midnight, working on them. Pumped 25 Bbl Hi Vis sweep for hole cleaning. Costs reflect 290 Bbis of new LVT, and 580 Bbls of new OBM delivered on 4/2 and 4/3. 6 April Drilled ahead, pumped a 25 Bbl Hi Vis sweep at 15,300', drilled ahead, pumped a 25 Bbl Hi Vis sweep at 15,575 at T.D., and circulated the hole clean. Pumped a dry job, POOH. Cut and slip drilling line and serviced the draw works. Continuing to POOH. 7 April Cont POOH, LD BHA, Test BOPE, Rig up and run wireline. Monitoring well for losses while logging. 8 April Logging the well with Schlumberger wireline on drill pipe. Monitoring well for losses while logging. 6 ~ALL~ ~ ~~~ ~ WELL NAME: OPERATOR: CONTRACTOR: Sperry Drilling Services BIT RECORD Totkat 1, lA, and 1B. Brooks Range Petroleum Nabors 27 E LOCATION: Coleville River AREA: ExploraNon,Nuisgsut STATE: Alaska BHA # Bft # Bit Type Bit Size Depth IN Depth OUT Footage Bit Hours TFA AVG ROP WOB RPM PUMP Press PUMP GPM Bit Grade Remarks 1 1 Mill Toolh Bft 12.25 113 2166 2053 22.3 0.942 92.1 15 40 2300 630 3 6 Wl" A E 1 BU BHA 2 2 Mill Tooth Bit 12.25 2166 3911 1745 21.9 0.942 79.7 22 50 3800 728 11 WT A E I BU TD Run 9 518" casing 3 3 HTC GT1 8.50 3911 3911 0 OPEN Used Bit 4 4 PDC BIT 8.50 3911 10092 6182 38.9 0.778 159.1 9 46 3800 654 0-1-WT-S-X-I-NO-PP 5 4RRI PDC BIT 8.50 10092 13174 3082 26.3 0.778 117.2 9 80 3850 560 1-1-WT-A-X-I-CT-TD 1A 1 1 PDC BIT 8.50 3950 11298 7348 44.6 0.778 165.0 8/10 81 3800 560 1-2-WT-A-X-I-CT-TD 18 1 1 PDC BIT 8.50 3950 15575 11625 70.7 0.778 165.0 8/12 94 3800 611 1-3-WT-A-X-I-CT-TD HALi.iBUATON Casing Record Sperry Drilling Sl3rvit.es Water Base and Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 12 Feb 2008 TD Date: 18 March 2008 Exploration, Nuisgsut Date Depth tt-MD Wt Ws sec PV YP ib/100 Gels wnaar= Filt m130m 608I308ft00/t00/6l 3 Cake 32~Ws Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil O/W ratio Remarks 12-Feb 850 9.60 283 40 45 20/55/0 ~z4asnvs3/2an7 S ud Well 13-Feb 2068 9.40 152 21 40 20/65/0 7.0 82/81/5439/23/22 3 9.6 90.4 4.50 2500 8.8 14-Feb 2472 9.60 174 20 38 19/60/0 7.0 745ar~4z42u2o 2 9.4 90.6 2.50 1700 8.5 15-Feb 3800 9.60 165 17 37 28f/0!0 7.0 7v5a/as/39/zrrt~ 2 9.5 90.2 1.25 1450 9.5 POH for casin 16-Feb 3911 9.70 88 27 23 13/55/73 7.6 7n5aaaz4iore 2 9.9 90.1 1.25 1400 8.5 17-Feb 3897 9:70 55 19 7 1/2/0 5.0 45/2679/11/2/1 1 9.9 90.1 0.25 1250 9.0 Cement casin 18-Feb 3697 9.70 55 19 7 1/2/0 5.0 a424isni/vi 1 9.9 90.1 0.25 1250 9.0 19-Feb 3911 9.70 55 19 7 1/2/2 5.0 a5/2sn9nt/v, 1 9.9 90.1 0.25 1250 9.0 20-Feb 3911 10.10 190 39 18 11/22/24 2.0 s457/avzanino 1 5.6 30 61k 24.1 1.2 62.0 67/33 Chan etoOilMud 21-Feb 6000 10.00 118 46 23 16.5/28/28 2.0 715!69153/37/14/13 1 7.0 30.5 63k 24.4 1.7 60.0 66/34 22-Feb 7590 10.00 90 35 23 13!22/22 2.0 93/58/44/31/12111 1 9.7 31 60k 23.3 1.3 57.0 65/35 23-Feb 8844 10.00 114 31 21 14/20/0 2.0 a3/52/3s/27/ivtt 1 9.5 33 1.10 59k 23.1 1.0 67.0 67/33 Drillin 24-Feb 9034 10.00 119 27 16 12/20/0 2.0 7aa3/3vz31an.s 1 9.8 31 0.50 56k 24.5 1.0 61.0 69/31 Drillin ri in 25-Feb 10091 10.00 86 27 16 12/18/0 2.0 7aa3/3vzv4e 1 10.0 31 0.50 52k 23.2 1.6 61.0 69/31 Tri 'n for 5' i 26-Feb 10091 10.00 91 27 16 13/19/0 2.0 71/4a/3212219la 1 10.0 31 0.50 53k 23.5 1.6 61.0 69/31 Tri in oul BOP test 27-Feb 10091 10.50 76 20 17 6/16/20 2.0 sn3~/24i7/4a 1 10.0 31 0.35 50k 21.8 1.0 60.0 68/32 RIH with 5 DPH 28-Feb 10603 10.35 80 27 18 3/4/9 2.0 7va424n/3/z 1 10.0 32 50k 22.5 1.0 62.0 70/30 Drillin Ahead 29-Feb 11871 10.50 130 54 19 11/23/31 2.0 ~27n3/s3/3ams 1 10.0 32 4370 20.8 1.0 60.0 70/30 Drillin ahead 01-Mar 12790 10.60 147 56 26 19/34/42 2.0 13482/81/42/11/10 1 10.0 32 48k 23.8 0.5 60.0 71/29 Drillin Pum in Swab 02-Mar 13173 10.60 123 56 23 11/24/33 2.0 ~3snasir~3 1 10.0 32 50k 24.2 0.7 58.0 70/30 Drilled TD POOH 03-Mar 13173 10.70 124 56 23 11/23/33 2.0 1348461/33/148 1 10.0 32 50k 24.1 0.7 58.0 70/30 POOH VD BHA 04-Mar 13173 10.70 124 56 23 11/24/33 2.0 i3sns/sv33naa 1 10.0 32 50k 24.2 0.7 58.0 70/30 in well 05-Mar 13173 10.70 130 60 22 11/25/37 2.0 i3e/ava3/35nvro 1 10.0 31 50k 25.3 0.7 60.0 72/28 10 in well O6-Mar 13173 10.70 156 61 21 11/25/38 2.0 738/82183/35/11/10 1 10.0 31 50k 25.4 0.5 60.0 72/28 1 in well 07-Mar 08-Mar 13173 13173 10.70 10.80 180 155 62 53 20 27 10/25/35 10/23/30 2.0 2.0 144/82/54349n 133/84431/9/8 1 1 10.0 10.0 31 30 50k 47k 25.6 22.1 0.5 0.5 60.0 60.0 72.28 70/30 10 in well2nd rt in well 2 09-Mar 13173 10.70 146 57 22 11/22/30 2.0 13479/54/3119/8 1 10.0 31 47.5k 22.2 0.7 60.0 70/30 MDT b in 10-Mar 13173 10.70 147 58 21 11/22/31 2.0 i37na53/a~raa 1 10.0 26 48k 22.4 0.7 60.0 70/30 MDT b in 11-Mar 13173 10.70 149 58 21 11/22/31 2.0 i37n9/53/3viaa 1 10.0 26 46k 21.7 0.7 60.0 70/30 POOH 12-Mar 13174 10.70 120 76 26 15/37/39 1.0 naiozn5/44ivr 1 10.0 26 48k 23.1 0.6 59.5 70/30 L in well 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 13174 13174 13174 13174 13174 13174 10.80 10.80 10.90 10.90 10.70 10.10 120 120 120 120 120 120 66 66 64 67 58 50 34 34 32 26 16 20 14/34/35 15/36/36 16/35/36 18/35/36 13/24/25 11/23/24 1.0 1.0 1.0 1.0 1.0 1.0 is4~oonv4anvi is4ioona/a4ivr ~sassm/av~vio isaa3/ss/aaivio 132n4/53/28/48 izonasa26n/s 1 1 1 1 1 1 13.1 13.2 14.5 13.2 13.7 13.0 26 25 24.5 23.35 24 25 48k 475k 47k 47k 47k 47k 23.1 22.9 23.1 23.5 23.5 22.7 0.5 0.4 0.4 0.6 0.7 0.7 60.0 60.0 61.0 67.0 60.7 62.0 71/29 71/29 71/29 72/28 72/28 71/29 Lo in well 10 in well2nd A Clean hole, RIH S tted Wash down bokin for lu sli and cut TD this section of hole New Well Tofkat 1A New folder. Tofkat 1A ~~i Sperry Drilling Services Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 A Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 19 March 2008 TD Date: 28 March 2008 Exploration, Nuisgsut i Date Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/100ft` Filt m/30m 600/300/200/100/8/3 ak 2nd Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil OIW ratio Rema rks 19-Mar 3897 9.90 113 49 23 11/22/25 1.0 121nz/sv27n/s 1 13.0 25 0.00 47k 22.7 0.9 190 62.0 71/29 Tested BOP Ta cement 20-Mar 3898 10.00 123 49 22 10/19/25 1.0 12on1/so/zsn/s 1 13.0 25 0.00 47k 22.7 0.9 190 62.0 71/29 failed on to in cement. 21-Mar 4543 9.90 120 60 27 17/38/0 1.0 147/87/62/38/11/8/ 1 13.0 26 0.00 41k 19.8 0.7 280 59.5 70/30 Ta cement RIH with BHA 22-Mar 5970 10.10 119 49 23 13/26/0 1.0 121/72/52/33/11/10 1 14.5 25 0.00 46k 22.0 0.7 310 60.0 70/30 Drillin ahead 23-Mar 7460 10.00 89 51 27 13/25/0 1.0 129/78/58/37/11/11 1 13.8 25.75 0.00 45k 21.5 0.8 415 60.5 70/30 20 stand tri drillin ahead 24-Mar 9157 9.90 86 32 17 11/25/0 1.0 81/49/37/25!9/8 1 12.5 25.5 0.00 43k 20.9 0.5 355 62.0 70/30 Drillin ahead 25-Mar 11279 10.00 85 31 22 15/28/34 1.0 84/53/37/24/10/9 1 12.5 24.5 0.00 47k 23.1 0.9 370 63.0 70/30 T.D well POOH BOP 26-Mar 11279 10.00 90 33 19 15/27/32 1.0 85/52/36/24/10/9 1 12.5 24.5 0.00 48k 23.5 0.9 380 63.0 3 T.D well Sli and Cut ~~~~r ~ ~ Sperry Drilling Services Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 B Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 27 March 2008 TD Date: April 6th 2008 Exploration, Nuisgsut. Date Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/100f1` Filt m/30m 600/3001200/1001613 ak 2nd Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil OIW ratio Remarks 27-Mar 3989 10.00 90 32 19 15/27/32 1.0 83/51/36/22/1.0/8 2 12.5 24.5 0.00 49k 23.8 0.9 80 63.0 72/28 Ser Ri ,POOH, Cement 'ob 28-Mar 3989 10.00 90 32 19 15/26/31 1.0 70/54/48/41!30/29 2 12.5 24.5 0.00 49k 23.8 0.8 80 63.0 0 29-Mar 3989 10.00 90 32 19 14/24/31 1.0 145/87/60/39/11/10 1 12.5 24.5 0.00 49k 23.8 0.8 80 63.0 70/30 RIH, TAG Drill a head. 30-Mar 5200 10.00 137 58 30 24/32/40 1.0 146!88/65/42/18/19 1 11.6 24 0.00 42k 14.8 0.9 80 62.0 62/38 Short trip ,Drillin 31-Mar 7350 10.00 125 46 26 18/32/40 1.0 118/72/55/36/13/14 1 11.6 25 0.00 39k 19.6 1.3 80 62.0 71/29 Short tri ,Drillin 01-A r 8750 10.00 120 47 25 20/34/41 1:0 119/72/54/36!12/13/ 1 10.6 26 0.00 43k 20.6 1.8 80 62.0 70/30 Sweep ,Drillin 02-A r 10780 10.10 127 52 26 18/37/45 1.0 130/78/58/36/12/11/ 1 12.0 26 0.00 43k 20.6 2.1 80 62.0 70/30 Drillin Ahead ,swee 03-A r 11807 9.80 120 39 26 20/31!37 1.0 104/65/56/37/16/15 1 10.7 26 0.00 40k 19.4 1.7 80 62.0 70/30 Drillin Ahead ,swee 04-A r 13295 9.90 110 49 27 20/33/40 1.0 125/76/63/42/16/15 1 10.4 26 0.00 40k 20.0 1.8 80 62.0 70/30 Drillin Ahead 05-A r 14649 9.90 110 45 24 17/32/40 1.0 114/69/53/36/13/12 1 10.5 26 0.00 40k 19.4 1.8 00 62.0 70/30 Drillin Ahead 06-A r 15575 10.00 110 44 20 17/35/42 1.0 108/64/46/30/13/11 1 10.4 26 0.00 41k 19.8 1.8 80 62.0 70/30 T.D. WELL. 07-A r 15575 10.00 126 49 27 17/32/40 1.0 125/77/54/36/14!13 1 10.0 26 0.00 40k 19.4 1.8 80 62.0 70/30 Ri u for Side wall cores 08-A r 15575 10.00 119 49 27 17/32/40 1.0 125/76!54/36/14/13 1 10.4 26 0.00 41 k 19.8 1.8 80 62.0 70/30 Side wall cores, TD . Sperry Nell Name: To&at 1 Depth (MD) 5800 to 6500 k Location: NORTH SLOPE, ALASKA (ND) 3989 to 4342 ff DRILLING SERVICES Operator: BROOKS RANGE PETROLEUM Show Report No 1 Show Report Report Prepared By: Steve Jenkins/ Ed Jones DatelTime: 21-Feb-OS .,.:, .ti. !, 7!'.::. i.: .: e,';..? ..t..~ .i Report Delivered To: DOUG HASTINGS :..YN..:.n.. i"t: ~ .n! ,iry,,!, N..W, ::i...~: ,IVN .: xNi: :... !. V. ~: :i,:!Yn k:;ry;Ni u:' ' ,i. N!n,:N!.9[:!:M:. a:: IntefpretatlOn: Topset 3 Claysone: life brown-gray,soft firm, slightly calcareous. Siltstone: It- med brown ,soft firm, blocky, angular, slightly calcareous. Sand: Fine med, Angular, light gray, sub- rounded, pyritic. , '. k',N...: ,N!. . ^.: i.:~:'.i iP! y!ibf'NNN ::!. ...:: i~l:.. .. til «t9i1!.. ~;c.:~:~«:...!: . is i!.I', 1!a;n,:,: !;!':.~+: 11 Iln::,i;!Ni:i'!'::U:':::;i;~i'~:I'! A'!~~N!:i9:i:.'i.ig.'!::::Y,:..!..~tl! :: Fri;: is Nl': riN!z 41.:1!4ti. [+ 'J, rl' NiJ 1.' ~ I: .i :I 1 °i° . . . . . . Hydrocarbon Ratios Depth 5850 ft Gas x Units 974 Mud Chlorides (1000's) 63 k C1 C1 C1 C1 - ---- ---------------- Flowline ------9 ------------ Back round -- ----- Show ------------------------------------ - - - C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios 1000.0 C1 41295 - 41295 = 41295 C1/C2 = 15.8 C2 2615 - 2614 = 2614 C1/C3 = 30.7 C3 1489 - 1489 = 1345 C1/C4 = 199.5 C4 207 - 207 = 207 C1/C5 = #DIV/0! NPH C5 0 - 0 = 0 Gas flOil Non-Producible J % Depth 5950 ft Gas ~ x Units 1091 Mud Chlorides (1000's) 63k ----------------------- ---g ------------ Flowline Back round -- ------ Show -------------------------------- ppm ppm ppm Hydrocarbon Ratios C1 60383 - = 60383 C1/C2 = 12.4 C2 4888 - = 4888 C1/C3 = 19.3 C3 3128 - = 3128 C1/C4 = 132.1 C4 457 - 0 = 457 C1/C5 = #DIV/0! C5 0 - 0 = 0 ---------------------- Production ------------------- --------- -------------------------------- Analysis nGas nOil nWater n Non-Producible Hydrocarbons 3 Depth 6250 ft Gas UUnits 760 Mud Chlorides (1000's) 63k ---------------------------9 -------------- ------ Flowline Back round Show --------------------------------- ppm ppm ppm Hydrocarbon Ratios C1 42939 - = 42939 C1/C2 = 11.8 C2 3642 - = 3642 C1/C3 = 17.4 C3 2469 - = 2469 C1/C4 = 126.3 C4 340 - 0 = 340 C1/C5 = #DIV/0! C5 0 - 0 = 0 ---------------------------------------- Production ---------- --------------------------------- Analysis x Gas Oil Water Non-Producible Hydrocarbons 4 Depth 6500 ft Gas x Units 875 Mud Chlorides (1000's) 63k ----------------------- ---9 -------------- ------ Flowline Back round Show --------------------------------- ppm ppm ppm Hydrocarbon Ratios C1 24745 - = 24745 C1/C2 = 9.4 C2 2645 - = 2645 C1/C3 = 12.1 C3 2052 - = 2052 C1/C4 = 75.2 C4 329 - 0 = 329 C1/C5 = #DIV/0! C5 0 - 0 = 0 Production Analysis nGas I-IOiI I-(Water I-(Non-Producible Hvdrocarbons 100.0 Gas 10.0 Oil NPF 1.0 Hydrocarbon Ratios C1 C1 C1 C2 C3 C4 1000.0 NPH 100.0 Gas 10.0 Oil NPH 1.0 C1 C5 .:.>-..:::x .<,.:,,.,,<:~ s. ~.;, :.. S er p rY DRILLING SERVICES Show Report -. <. ..I. :... , 1. ' ... ~ i. ~ .:. .. 4~ . ~t i~ ~ s~,. Well Name: Totkat 1 Depth (MD) 8650 to 8850 ft Location: NORTH SLOPE, ALASKA (TVD) 5425 to 5525 ft Operator: BROOKS RANGE PETROLEUM Show Report No. 2 Report Prepared By' Steve Jenkins/ Ed Jones Date/Time: 23-Feb-OS Report Delivered To: DOUG HASTINGS ',:~: ,.r , Interpretation: Claysone: Light Brown Gray, Firm, blocky, slitly calcareous, Sandstone: Off white, cream, very fine grain, sub- anglar, mod- cep Siltstone: Coarse crystalline, light gray, very coarse grained, calcite, sub- rounded, poorly sorted, soft, poorly cemented, blocky ~' iii no apparent bedding. 1 °i° Depth 8650 ft Gas x Units 75 Mud Chlorides (1000's) 64k ---------------------------9 --------------------------------------------------------- Flowline Back round Show Hydrocarbon Ratios C1 C1 C1 C1 - - - - C2 C3 C4 C5 `~' ,: ,,~ ppm ppm ppm Hydrocarbon Ratios 1000 0 ~ a . C1 7324 - = 7324 C1/C2 = 33 3 ~ " . C2 220 = 220 C1/C3 = 120 1 ) ` - . C3 61 - = 61 C1/C4 = #DIV/0! + ; ?% C4 - 0 = 0 C1/C5 = #DIV/0! NPH __ C5 0 - 0 = 0 -------------------------------------------------------------------------------------- Production 100.0 -- --- -- -- - ------~ ~--- ~~• --------------- ' i ; ~' i? iii Analysis x Gas Oil Water Non-Producible Hydrocarbons 2 % ~ ; iii D th 8750 ft G it 74 M d Chl id 1000' 64k U ~ ~~ ep as ---------------------------9 --- Fl li B k x n s u or es ( s) ------------------------------------------------ - d Sh Gas ti ( ' ow ne ow ac roun PPm PP-n PPm Hydrocarbon Ratios 10.0 - _ .. - _- -------------- - _ - " - ------ ---- _ _ _ - - ------- ,~ ' ~: ii `~ i C1 7641 - = 7641 C1/C2 = 32.7 C2 234 - = 234 C1/C3 = 186.4 - 41 = 41 C1/C4 = #DIV/0! C Oil - - 3 C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ---------------------------------°-°°---------------------------------------------- Production Analysis x Gas Oil Water Non-Producible Hydrocarbons NPH 1.0 3 °i° Uepth 8850 ft Gas Units 80 Mud Chlorides (1000's) 64k ---------------------------9 --------------------------------------------------------- Flowline Back round Show C - C Hydroca 1 C - 2 C rbon Ratio 1 3 s C1 C - - C4 C ~~ ,: 1 -° ' :: 5 ~' ; ;: ,, ° ` ~: G ppm ppm ppm Hydrocarbon Ratios 1000 0 d, ; . " i C1 5667 - = 5667 C1/C2 = 28.6 C2 198 - = 198 C1lC3 = 83 3 . C3 68 - = 68 C1/C4 = #DIV/0! NPH ~" ~ C4 - 0 = 0 C1/C5 = #DIV/0! " ` C5 0 - 0 = 0 Production 100.0 ---,-~--=-1-- _ ------- --------- Anal sis x Gas Oil Water Non-Producible H drocarbons `°' ~ y y 4 % th ft Ga D x Units Mud Chlorides (1000's) Gas _ i ep s ---------------------------9 --- Flowline Back rou ------------------------------------------------ nd Show ~ - ' N~ ! PPm PPm PPm Hydrocarbon Ratios 10.0 _ _ ~ - - _ _ _ ,I 0 ;~ '~` C1/C2 = #DIV/0! C1 - = Oil F C2 - = 0 C1/C3 = #DIV/0! = #DIV/0! 1/C 0 0 C4 - = C 5 C5 0 - 0 = 0 --------- --------------------- ---------------------------------------------- NPH 1 0 ': - Production Analys+s rlGas Gil b'Vater ~nlon-Producible i!vdrocarbuns . _ __ „w. ~,i_ 'Ii ~~ ®~ Well Name: Totkat 1 Depth (MD) 12750 to 12900 ft Location: NORTH SLOPE, ALASKA (TVD) 7487 to 7565 ft DRILLING SERVICES Operator. BROOKS RANGE PETROLEUM Show Report No 3 SNOW Report Report Prepared By Steve Jenkins/ Ed Jones Date/Time. March the 3rd Report Delivered To: DOUG HASTINGS :A~. Y 1`.' ~;1 ..5 ~h'+. •; 'T~ :Yil': %).' h 14-: it ), InterpretatlOn: Limstone:Buff, Cream, Dolomitic, Moderately hard, Sucrosic, blocky, Glauconite Siltstone: Coarse crystalline, Grey, very coar; grained, sub-rounded, poorly sorted, moderately hard, Blocky, no apparent bedding, Sand: Fine Crystalline, light gray to gray, to fine grain, dolomite, si angular, moderately hard, with glauconite, pyritic, Porosity good. Fluorescence: Moderate, dull yellow with weal oil stain. 1 Depth 12795 ---- --~-Flowline -~-- ppm C1 698 - C2 70 - C3 53 - C4 - C5 0 - :: h '% ft Gas x Units 30 Mud Chlorides (1000's) 52k lackground Show ppm ppm Hydrocarbon Ratios = 698 C1/C2 = 10.0 = 70 C1/C3 = 13.2 = 53 C1/C4 = #DIV/0! 0 = 0 C1/C5 = #DIV/0! 0 = 0 Production Analysis x Gas Oil Water Non-Producible Hydroca 2 Depth 12850 ft Gas x Units 45 Mud Chlorides (1000's) --------------------------9 --------------------------------------------' Flowline Back round Show ppm ppm ppm Hydrocarbon Ratios C1 678 - = 678 C1/C2 = 8.9 C2 76 - = 76 C1/C3 = 10.4 C3 65 - = 65 C1/C4 = #DIV/0! C4 - 0 = 0 C1lC5 = #DIV/0! C5 0 - 0 = 0 ------------------------------ Production ------------------- ------------------------ Analysis x Gas Oil Water Non-Producible Hydrocai 3 Depth 12900 ft Gas x Units 78 Mud Chlorides (1000's) --------------------------9 --------------------------------------------' Flowline Back round Show ppm ppm ppm Hydrocarbon Ratios C1 5115 - = 5115 C1/C2 = 11.2 C2 456 - = 456 C1 /C3 = 16.4 C3 311 - = 311 C1JC4 = 83.9 C4 61 - 0 = 61 C1/C5 = #DIV/0! C5 0 - 0 = 0 Productwn Analysis x Gas Oil Water Non-Producible Hydrocai d Depth ft Gas Units Mud Chlorides (1000's) --------------------- Flowline -----9 --------------------- Back round Show -----------------------' ppm ppm ppm Hydrocarbon Ratios C1 - = 0 C1/C2 = #DIV/0! C2 - = 0 C1/C3 = #DIV/0! C3 - = 0 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ----------- Production ---------- --------- ---------- ------------------------ Analvsis fxlGas I-lOil I-lWater r7Non-Producible Hydrocai C1 C1 C2 C3 1000 ^ NP 100 G 10 N 1, C1 C1 C4 C5 .~ - H 0 ---- -- --- ------- --'--=- - ---- - ---- as .--- 0 ---- - - _ ..--------------- Oil - - - PH n C1 C2 1000.0 ~ NPFi 100.0 Gas 10.0 Oil NPH 1.0 carbon Ratios C1 C1 C3 C4 C1 C5 _-I-. ;~-1-----r-- Lithologic Summary Brooks Range Petroleum Corpoation Totkat 1 3_ Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudloas 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1272- 1911 TVD Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Clav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1911- 2620 TVD Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 61 19 M D 2620- 4150 TVD Shale Wall K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 Lithoiogic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 6119- 6288 MD 4150- 4236 TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. 6288- 6401 MD 4236- 4293 TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 6401 - 6447 M D 4293- 4316 TVD Oannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 6447- 9632 MD 4316- 5921 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. 1 Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 9632- 10496 MD 5921- 6352 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siitstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Ouartz, sub rounded, light grey, trace glauconite, no shows. 10496-10722 MD 6352- 6465 TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertiey sorted, porosity, Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siitstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 10722-10988 MD 6465- 6600 TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dui white. Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siitstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 2 Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 10988-11190 MD 6600- 6700 TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Ciavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oii stain. 11190-11350 MD 6700-6781 TVD Top of Turbidites Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 1 1 350-1 1 688 MD 6781- 6955 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithotogy and Remarks ( TVD-ft) ft/hr Units 11688-11767 MD 6955-6995 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oii stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Duii white, Cut weak. 1 1 767-1 1 932 M D 6995- 7027 TVD K-1 FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding.Fluorescence: none, Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence,Duil white, Cut weak. 1 1 932-1 1950 MD 7027-7089 TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straining Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. 4 Lithologic Summary Brooks Range Petroleum Tolkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 11950- 12621 MD 7089- 7740 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 1 2621 - 1 2779 M D 7440- 7523 TVD BKU FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SANDSTONE: Light gray to drark grey, very coarse grained sub- Angular, very poorley sorted, friable, moderately hard, blocky, Shale streaks. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. SHALE: Gray to Dark gray, slightly calcareou, very silty, Fluorescence, trace weak. 1 2779- 1 2790 M D 7523- 7540 TVD AlpineC FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. SHALE: Gray to Brown, slightly calcareous, slighty dolomitic Slightly argillaceous, moderately hard, sucrosic, glauconite Chert. Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 1 2790- 1 31 74 M D 7540-7731 TVD J-4 FORMATION Sand: Light gray to gray, fine grained, sub angular, moderately Well sorted, moderately well sorted, moderately hard, angular, Glauconite, pyretic, Porosity: good, Fluorescence: moderate Dull yellow, cut: moderately streaming, dull yellow, weak oil Stain. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, giauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, chert, slightly calcareou, very silty, Fluorescence, trace weak. 6 Sperry Drilling Service Brooks Range Petro Tofkat # 1 Tops MD TVD SSTVD Gubik Base 575 52z -489 Permafrost Base 1288 1272 -1239 W Sak Base 2064 1911 -1878 Shall Wall (K-5) 3084 2620 -2587 Shoe 3857 Surface Casing 3911 3032 -2999 Qannik 2 6119 4150 -4097 Qannik 1 6288 4236 -4183 Qannik Base 6401 4293 -4118 C4~ 6447 4316 -4274 Top Turbidites 9632 5921 -5868 Top Turbidites 2 10496 6352 -6299 Top Turbidites 2 base 10722 6465 -6412 Top Turbidites 1 1o9ss 6600 -6547 Top Turbidites 1 base 11190 s7oo -ss47 H RZ 11350 6781 -6728 Ka l u b i k 11688 6955 -6902 K-1 11767 6995 -6942 Kupark C 11932 7027 -6974 I_C V 11950 7089 -7036 BKU 12621 7440 -7387 Alpine C 12799 7523 -7470 .~-4 12790 7540 -7487 TD 13174 7731 -7678 PAD Elev. 19.8 Drill Floor 32.9 K.B. 52.7 Qannik Top Albian Turbidites Kuparuk C Brooks Range Petroleum T® API-~ 50-103-20567-00 2" Sperry Drilling Services Brooks Range Petroleum T®~ AP 1-~ 50-103-20567-00 Z„ ~° MU L Sperry Drilling Services Brooks Range Petroleum 'T T' 1 ~-PI-~50-103-20567-00 5" ~~:.. Sperry Drilling Services Lithologic Summary Brooks Range Petroleum Corpoation Tofkat lA 3. Lithologic Summary Depth (ft) ROP Gas Formation Lithofogy and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudloas 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1272- 1911 TVD Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Clav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1911- 2620 TVD Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 61 1 9 M D 2620- 4150 TVD Shale Wall K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 Lithologic Summary Brooks Range Petroleum Tolkat lA Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units 5938 M D 4150-TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. MD TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 6232 M D 4350 TVD Oannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, sllghtiy silky, Fluorescence: yellow cut with fast streaming. 6232- 8903 MD 4350 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded., Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. Lithologic Summary Brooks Range Petroleum Tolkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 8903 M D 5865 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned,pooriy sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatiely sorted, blocky, Ouartz, sub rounded, light grey, trace glauconite, no shows. MD TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertley sorted, porosity, Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. MD TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dul white. Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 2 Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units MD TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Duii white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 10450MD 6757TVD Top of Turbidites Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white,. Cut, moderately streaming, milky white, with trace of oil stain. 10844-11121 MD 6967- 7097 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 1 0844- M D 6967 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 11121 MD 7097 TVD K-1 FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding.Fluorescence: none, Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence,Dull white, Cut weak. MD TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 11121-11297 MD 7097 7169 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Duil white, Cut weak. Sperry Drilling Service Brooks Range Petro Tofkat # 1 A Tops Prognosis Drilled Drill Flooi 32.9 SSTV D M D M D TV D SSTV D K.B. 32.9 Date TD TV D Permafrost base W Sak Shale Wall (K-5) Sidetrack Shoe ~ 3857 19-Mar Surface Casing 3911 3032 -2999 20-Mar Topset 3 -4118 5938 4154 -4121 Qannik 21-Mar 4742' 3417 C40 -4380 6744 6232 4350 -4317 top Albian Foreset 22-Mar 6067' 4233 Top Turbidites -5900 9972 8903 5865 -5865 23-Mar 7715' 5189 H RZ -6765 11,457 10450 6757 -6757 Kalubik -6940 11,783 1.0844 6967 -6967 LC U -7020 12,120 11121 7097 -7097 TD -7650 13,206 11297 7169 -7169 TD Brooks Range Petroleum T®~ ~4P 1-50-103-20567-01 2" ~ . Sperry Drilling Services Brooks Range Petroleum T® A API-50-103-20567-01 2" ®/ MU®LG Sperry Drilling Services Brooks Range Petroleum ®F A API-50-103-20567-01 5" ~~. .: Sperry Drilling Services Lithologic Summary Brooks Range Petroleum Corpoation Tofkat 1B 3_ Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudlocfs 3857 Shoe 3911 MD Surface Caseing 3032 TV D 3911- 6119 MD 2620- 4155 TVD Shale Waii K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, giauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,siighty cement 6119- 5594 MD 4155 TVD Qannik 2 FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. MD TVD Qannik 1 FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 0 Lithologic Summary Brooks Range Petroleum Tofkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 8945 MD 4337 TVD Qannik Base FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 8945-12320 MD 4337-5765 TVD C-40 Albian Foresets Top FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows 12320-14640 MD 5765-6781 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. Lithologic Summary Brooks Range Petroleum Totkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 14640-15098 MD 6781- 6973 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to ciaystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. 15098-15374 MD 6973-7061 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE:Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part,. very silty, Fluorescence, Duil white, Cut weak. 15374-15388 MD 7061-7080 TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE:Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. 2 Lithologic Summary Brooks Range Petroleum Totkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 15388-15575 MD 7080- 7146 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. TD WELL. 15775MD 7199 TVD Sperry Drilling Service Brooks Range Petro Tofkat # 1 B Tops Tofkat 1 B ~ Pad ele 20 Prognosis Drilled Drill Flc 33 SSTVD MD MD TVD SSTVD K.B. 53 Date MD TVD Permafrost base W Sak Shale Wall (K-5) Sidetrack 1 B Shoe ~ 3857 Surface Casing 3911 3032 2999 Topset 3 -4092 8626 8594 4155 -4102 Nanushuk 31-Mar 5503 3450 C40 -4263 9038 8945 4337 -4284 top Albian Foresets 01-Apr 7697 3909 Top Turbidites -5835 12586 12320 5765 -5765 02-Apr 9211 4407 HRZ -6785 14,730 14640 6781 -6781 03-Apr 10789 5130 Kal u b i k -6980 15,170 15098 6973 -6973 04-Apr 12,158 5680 Kup C LCU -7015 15,250 15374 15388 7061 7080 -7061 -7080 05-Apr 14,066 06-Apr 15,575 7199 TD -7200 15575 7146 -7146 Brooks Range Petroleum TOF 1B API-50-103-20567-02 2" MU®L®ta Sperry Drilling Services Brooks Range Petroleum T®F ~ T 'I ~ API-50-103-20567-02 2" '1'V® Ml1 L ~ Sperry Drilling Services Brooks Range Petroleum 'i'®F 7° 1 API-50-103-20567-02 5" MU Sperry Drilling Services Brooks Range Petroleum To F KAT °I , ~ -, 7 s I4P 1-~50-103-20567-00 API-50-103-20567-01 API-50-103-20567-02 CD D T~ EOWl~ EMF and PDF LOGS Sperry Drilling Services Customer: Brooks Ran e Petroleum R rt N 1 ~~~~t~~~,~,,,~~ g epo o.: Well: Tofkat 1 Date: 13/02/2008 Sp®rry Orelling sar..ices Area: North Slope Depth 1015 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1015 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 80 ft/hr 118 ft/hr ( 429 ft/hr ~ 870 ) Gas" 0 unit: 2.5 unit: ( 33 units C~ 1004 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 2 spm Flow rate 415 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 1090 psi Mud Wt In 9.60 ppg Visc # 283 secs API filt ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 40 cP YP 45 Ibs/100ft2 Gels 20 \ 55 \ 0 MBT pH 9.0 Sd Bit No.: 1 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 Wt On Bit: 14-Jan RPM: 40 Hrs. On Bit: 8.6 Total Revs on Bit: 1 k Footage for Bit Run 1015 Short Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % CLAY 20 % GRAVEL Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 712 to 730 10 tr 1009 0 0 0 0 910 to 1005 33 10 3315 0 0 0 0 to to to 24 hr Rec< S ud well. Drill to 1015ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 2 ~`~~ „t„~~ Well: g Tofkat 1 p . Date: 14/02/2008 Sperry Oriliing S®rvicBS Area: North Slope Depth 2166 udlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1151 Rig Activity: wiper trip Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ftlhr 119 ft/hr ( 416 ft/hr C°3 1789 Gas' 67 unit: 47 unit; ( 225 units @ 1873 ( Sample Quality Good x0 Fair Poor ) ) ) Pump and Flow Data Pumps 1+2 spm Flow rate 630 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 2300 psi Mud Wt In 9.40 ppg Visc 152 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.60 ppg PV 21 cP YP 40 Ibs/100ft2 Gels 20 \ 65 \ 0 MBT pH 8.8 Sd 4.5 Bit No.: 1 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 22.9 Total Revs on Bit: Footage for Bit Run 2166 Short Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 100 % CLAY Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 1513 to 1676 127 32 1795 to 1820 185 79 1867 to 1888 225 80 1955 to 1976 209 47 to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 6287 0 0 0 0 no data 4676 0 0 0 0 8982 23 0 0 0 24 hr Rec~ Drill 1015ft to 2166ft, wi er tri Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: : 3 Brooks Range Petroleum Report No ~~, ~ Well: Tofkat 1 . Date: 15/02/2008 Sparry Grilling S®rvices Area: North Slope Depth 2733 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 567 Rig Activity: Drilling Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 40 ft/hr 10.2 ft/hr ( 187 ft/hr C~ 2643 Gas' 140 unit: 70 unit; ( 181 units C°3 2644 ( Sample Quality Good Q Fair Poor ) ) ) Pump and Flow Data Pumps 1+2 spm Flow rate 710 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 2960 psi Mud Wt In 9.60 ppg Visc 174 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.60 ppg PV 20 cP YP 38 Ibs/100ft2 Gels 19 \ 60 \ 0 MBT pH 8.5 Sd 2.5 Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 10.2 Total Revs on Bit: Footage for Bit Run 567 Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 299 Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 50 % CLAY 40 % CLYST 10 % SLTST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 2350 to 2360 93 55 2434 to 2453 103 75 2534 to 2549 153 70 2596 to 2675 181 72 to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot CS Tot 6047 28 0 0 0 6418 32 0 0 0 8363 29 0 0 0 12833 27 0 0 0 24 hr Rec~ Drill to 2166ft, POH for bit chap e. RIH bit#2. Drill ahead " Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air - Customer: Brooks Range Petroleum Report No : 4 ~~~ ~~„ Well: Tofkat 1 . Date: 16/02/2008 ~p®rry Drilling Sarvic®g Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1178 Rig Activity: wiper trip Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 128 ft/hr ( 336 fUhr C°3 3127 Gas' na unit: 125 unit; ( 325 units ® 2933 ( Sample Quality Good xQ Fair Poor ) ) ) Pump and Flow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3780 psi Mud Wt In 9.60 ppg Visc 165 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 17 cP YP 37 Ibs/100ft2 Gels 28 \ 70 \ 0 MBT pH 9.5 Sd 1.25 Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 21.9 Total Revs on Bit: Footage for Bit Run 1745 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL Connection Gas and Mud Cut 2936 ft 325 units 9.6 ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 2930 to 2935 325 204 3272 to 3290 206 165 to 3691 to 3705 285 45 3791 to 3800 188 60 GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 18898 324 52 0 0 26268 0 0 0 0 12386 63 13 0 0 14000 64 7 0 0 24 hr Rec~ Drill to 3910ft. Circ hole clean. Wi er tri Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No : 5 IF-fIALILI l~tl~Tatlel Well: Tofkat 1 . Date: 17/02/2008 Sparry f7rilling S®rVIC68 Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Run Casing AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C°3 Gas* na unit: unit: ( units C°3 ( Sample Quality Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3780 psi Mud Wt In 9.70 ppg Visc 88 secs API filt 7.6 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 27 cP YP 23 Ibs/100ft2 Gels 13 \ 55 \ 73 MBT ### pH 8.5 Sd 1.25 Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 21.9 Total Revs on Bit: Footage for Bit Run 1745 Trip Depth: 3911 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 1272 Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL Connection Gas and Mud Cut ft units ppg ft -units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Rec~ Wi er tri . Circ hole clean. POH. Run casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000. units = 100% Gas In Air Customer: Brooks Range Petroleum Report No : 6 ~-1ALIL~I~t.:~ T't~i~` t . Well: Tofkat 1 Date: 18/02/2008 Sperry ~riliing S®rvicas Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Caseing Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr @ ) Gas' na unit: unit; ( units C~ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: psi Mud Wt In 9.70 ppg Visc 55 secs API fill 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 °~, Bit No.: Type: Bit Size: Jets: x x x TFA: 1~^Jt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 °~~ CLAY 40 °o GRAVEL '~ °o °~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Run /cement casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re : 7 ort No t-l~~l_Lli uRTi~ g p . Well: Tofkat 1 Date: 19/02/2008 Sperry f7rilling Services Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: BOP Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr fUhr ( ft/hr ~ ) Gas` na unit: unit: ( units ~ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x x x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 °< CLAY 40 '~ GRAVEL _ °~ °~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ cement casin . N/U BOP. Test BOP - Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum R rt N 8 iH~ILLl113l.~iR'1' g epo o.: Well: Tofkat 1 Date: 20/02/2008 Sperry Grilling servicBS Area• North Slope Depth 3911 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Circulate Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr @ ) Gas" na unit; unit: ( units @ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps 120 spm Flow rate 526 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 920 psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 2 MBT pH 9.0 Sd 0.25 Bit No.: 3 Type: HTC GT1 Bit Size: 8 1/2 Jets: x x x TFA: OPEN Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 °~ CLAY 40 °~ GRAVEL °~ °~~ °~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Test BOP. RIH. M/U i e, RIH and drill cement, float and shoe to 3911ft. Dis lace to OBM Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 9 ih-1e~1LIL1®tI.~RT't~JV g p . Well: Tofkat 1 Date: 21/02/2008 Sp®rry Grilling s®.-.aces Area: North Slope Depth 4480 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 569 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 `~ Current 24 hr Avg 24 hr Max R.O.P. 320 ft/hr 213 ft/hr ( 373 ft/hr C~ 4079 ) Gas" 113 unit: 68 unit: ( 139 units @ 4323 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 112 spm Flow rate 470 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres; 3760 psi '' Mud Wt In 10.10 ppg Visc 190 secs API filt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 39 cP YP 18 Ibs/100ft2 Gels 11 \ 22 \ 24 MBT pH Sd 0.25 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 72 Hrs. On Bit: 2.7 Total Revs on Bit: Footage for Bit Run 569 Trip Depth: 3911 ft Trip Gas: 22 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 100 °~ CLYST °~ °~ °o °_ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 4096 to 4130 111 50 8598 0 0 0 0 4315 to 4348 139 74 9717 0 0 0 0 to to to 24 hr Rec: POH bit3. RIH bit4. Drill 39121ft to 3931ft. Leak off test. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: : 10 Brooks Range Petroleum Report No _ 3~7~~]~ ~'`~ Well: Tofkat 1 . Date: 22/02/2008 Sap@~.-y drilling se~..~oes Area: North Slope Depth 6716 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 2236 Rig Activity: drilling Report For: Jack Keener Daily Cost $3,075 `:~? Current 24 hr Avg 24 hr Max R.O.P. 225 ft/hr 219 ft/hr ( 670 ft/hr @ 5184 Gas' 329 unit: 315 unit: ( 1001 units @ 6004 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps 107 spm Flow rate 435 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres; 4090 psi ' Mud Wt In 10.00 ppg Visc 118 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 46 cP YP 23 Ibs/100ft2 Gels 17 \ 28 \ 28 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 5.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 12.97 Total Revs on Bit: Footage for Bit Run 2805 Trip Depth: ft Trip Gas: Short Trip Depth 5855 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 413 Mud Cut: 10.1 ppg Short Trip CI: 31689 ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % CLYST 20 % SLTST - `' Connection Gas and Mud Cut 5956 ft 965 units 10.1 ppg 6053 ft 984 units 10.1 ppg 6147 ft 975 units 10.1 ppg 6244 ft 720 units 10.1 ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg ~ Depth Gas in units Max Background 5294 to 5311 243 211 5573 to 5669 389 262 5901 to 5936 950 417 5975 to 6007 1001 520 6296 to 6343 702 422 GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 19118 141 17 0 0 29955 624 171 0 0 64610 4281 2605 347 2 65701 5083 3228 488 34 47539 4016 2694 381 3 ,~`; 24 hr Rec< Drill ahead. Wi er tri sat 4906ft, 5855ft. Connection ases seen after wi er tri at 5855ft. Oil shows in siltstones from @6000ft Y Logging Engineer: Steven Jenkins /Ian Johnstone '" 10000 units = 100% Gas In Air ' : 11 Customer: Brooks Range Petroleum Report No _ ~f~'`~'~1~~`~ . Well: Tofkat 1 Date: 23/02/2008 Sperry drilling SBrvGces Area: North Slope Depth 7785 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1069 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,000 s`: Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 158 ft/hr ( 306 ft/hr @ 7584 ) Gas* na unit: 136 unit: ( 327 units @ 6717 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 110 spm Flow rate 454 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3990 psi , `. Mud Wt In 10.00 ppg Visc 9o secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 35 cP YP 23 Ibs/100ft2 Gels 13 \ 22 \ 22 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 19.72 Total Revs on Bit: Footage for Bit Run 3874 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLYST 30 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: e Petroleum Re : 12 Brooks Ran ort No ~`~'°®~"~` ~'' ~~~ Well: g p . Tofkat 1 Date: 24/02/2008 Sperry Grilling sBrvicBS Area: North Slope Depth 9227 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 1441 Nabors 27 Rig Activity: Drilling Ahead AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 ~~'~ ~.'. Current 24 hr Avg 24 hr Max R.O.P. na fUhr 120 ft/hr ( 306 ft/hr @ 7584 ) Gas* 72 unit: 151 unit: ( 151 units @ 3940 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 105 spm Flow rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres; 4065 psi `' '<. Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 30 cP YP 22 Ibs/100ft2 Gels 11 \ 18 1 0 MBT pH Sd ti Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 30.70 Total Revs on Bit: Footage for Bit Run 5313 Trip Depth: ft Trip Gas: Short Trip Depth 7786 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft 4 ~~ Current Lithology: 40 % CLYST 40 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ' Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot ;y _ ,' 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. ~f ~7 '~. -.:d ~ ~ %Y ?` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ` ` Customer: Brooks Ran e Petroleum Re : 13 ort No ~' ~-t~~~1 ~ ~~ ~ ~~ Well: g p . Tofkat 1 Date: 25/02/2008 `' sperry OriUing Services Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 865 Nabors 27 Rig Activity: POOH AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 : Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 72 ft/hr ( 149 ft/hr @ 9858 ) Gas* na unit: 55 unit: ( 76 units @ 9486 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 105 spm Flow rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 4065 psi 4 `; , Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd t'- Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 ~, Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: .ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST ~ ,~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg 4 . ° ~` ~ Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot `;+ 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. Sto drl , circ btm u ,be in POOH, L/D d . "r Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 14 '7 7 y~ ~~ Well: Tofkat 1 Date: 26/02/2008 -_' sr~e~~y Grilling Services Area: North Slope Depth 10092 _ udlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: POOH Report For: Jack Keener Daily Cost $3,075 ~_ '' '~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas" na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 66 secs API Tilt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd ; ~:; -:. , ,, `' ~:: Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg ',, ,.~ ~:;, ~" „'~ _ Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot '•~ 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. finish POOH.. La down MWD. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range- Petroleum Report No.: 15 _ '~~'~~~~'~'' `~ Well: Tofkat 1 Date: 27/02/2008 <y Sperry i7rilling Services Area: North Slope Depth 10092 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: BOP test - Job No.: AK-AM-5672885 Report For: Jack Keener Mudlogger's Morning Report Daily Cost $3,075 ,. _ _ . ,: _ _ :. .. ~~; Current 24 hr Avg 24 hr Max Pump and Flow Data `-' ~~~' R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 ) Pumps na spm Flow rate na gpm ''" Gas" na unit: na unit: ( 76 u nits @ 9486 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres; na psi Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg ., Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd ; .. _ , ; - _: _ ~ . ,. ; :<: °.' Bit No.: 4 Type: PDC Bit Size: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 X44 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: ppm Y ``; Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm +Y Magnet Recover Lbs to to Feet of Fill on Bottom: ft _ Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ~. t.. ... 4 GAS PEAKS ~;- ~: Depth Gas in units Chromatograph in ppm , ; ' Max Background C1 C2 C3 C4 Tot C5 Tot to ~ to ~x to ,1 to _ to - . ~ _ _ _ ~~ 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. '' Test BOP's 1` 54 E '.a '~ Logging Engineer: Steven Jenkins ! Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 16 s=~.~®~~~"~ '~ '~ Well: Tofkat 1 Date: 28/02/2008 ': Sperry Grilling Services Area: North Slope Depth 10092 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Wash and Ream Job No.: AK-AM-5672885 Report For: Jack Keener Mudlogger's Morning Report Daily Cost $3,075 . ,,. Current 24 hr Avg 24 hr Max Pump and Flow Data ~~ R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 ) Pumps na spm Flow rate- na gpm `:~:? Gas* na unit: na unit: ( 76 u nits @ 9486 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. ~~ Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.00 ppg Visc 76 secs API felt ml HT HP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 20 cP YP 17 Ibs/100ft2 Gels 6 \ 16 \ 20 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `~ Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mu d Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg `~` ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg r4 GAS PEAKS 'a ';~ Depth Gas in units Chromatograph in ppm y Max Background C1 C2 C3 C4 Tot C5 Tot ,~ ~` to to to -~ to n to :i - ~~ 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. TIH to bottom, wash and ream... '~ `+ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 17 _ _ ~°'`~°' ~~' ~ Well: Tofkat 1 Date: 29/02/2008 Sperry frilling Services Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 798 Nabors 27 Rig Activity: Wash and Ream AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 ` : Current 24 hr Avg 24 hr Max R.O.P. 139 ft/hr 80 ft/hr ( 246 ft/hr @ 10668 ) Gas' 129 unit: 245 unit; ( 2400 units @ 10092 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flow rate 534 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 3414 psi - . ' Mud Wt In 10.35 ppg Mud Wt Out 10.35 ppg Visc 80 secs API felt ml HTHP 3.1 ml Mud Wt at Max Gas 10.1 ppg PV 27 cP YP 18 Ibs/100ft2 Gels 3 \ 4 \ 9 MBT pH Sd Bit No.: 4 Type: Wt On Bit: 9.00 RPM: PDC Bit Size: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 45.30 Total Revs on Bit: Footage for Bit Run 6973 Trip Depth: 10092 Short Trip Depth Magnet Recover Lbs ft Trip Gas: ft Short Trip Gas: to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 50 % CLYST 30 % SLTST 20 % SST _ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ` Depth to to to to to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot ' 24 hr Rec~ Drillin Ahead 'a Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~,~ ~ 13pBrry Grilling S®rvicas Mudlogger's Morning Report astomer: Brooks Range Petroleum Well: Tofkat 1 Area: North Slope Lease: Exploration Rig: Nabors 27 Job No.: AK-AM-5672885 Current 24 hr Avg 24 hr Max R.O.P. 204 ft/hr 45 ft/hr ( 334 ft/hr @ Gas' 25 unit; 45 unit; ( 186 units @ ( Sample Quality x Good ~ Fair Poor Mud Wt In 10.40 ppg Mud Wt Out 10.40 ppg Visc PV 94 secs API felt 36 cP YP 16 Ibs/100ft Bit No.: 4 Type: Wt On Bit: 9.00 RPM: PDC Bit Size: 8 1/2 70 Hrs. On Bit: 62.30 Trip Depth: Short Trip Depth Magnet Recover Lbs ft ft Trip Gas: Short Trip Gas: to Current Lithology: 40 % SH 40 % SLTST Report No.: 18 Date: 03/01 /2008 Depth 12070 Footage Last 24 hrs: 978 Rig Activity: Drill Ahead Report For: Mr Larry 2 Gels 5 \ 11 \ 17 MBT pH Sd Daily Cost $3,075 Pump and Flow Data 12000 ) Pumps 57/70 spm Flow rate 534 gpm 11938 ) Pump Capacity 4.41 gps ; Pump Liner & Strk 6 x 12 in.. Pump Pres: 3414 psi ml HTHP 3.5 ml Mud Wt at Max Gas 10.1 ppg Jets: 6 x 13 x x TFA: 0.778 - Total Revs on Bit: Footage for Bit Run 7951 Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C~ Tot -_ 11938 to 11940 186 40 8 1 1 1 to to i to to ~ 24 hr Rec< A ~ Drillin4 Ahead,Work on Pumps, Dril Ahead ~. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 19 ~- _ ~~' ~' ' ' ~ ~~ Well: Tofkat 1 Date: 02/03/2008 spe~~y or:u:~g sa.-v~cB$ Area: North Slope Depth 12795 Lease: Exploration Footage Last 24 hrs: 725 Rig: Nabors 27 Rig Activity: Drill Ahead Job No.: AK-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 30 ft/hr ( 289 ft/hr @ 12115 ) Pumps 74 spm Flow rate 311 gpm Gas" 7 unit: 18 unit; ( 25 units @ 12504 ) Pump Capacity 4.41 gps ( ) Pump Liner & Strk 6 x 12 in. Sample Quality x Good ~ Fair Poor Pump Pres: 2131 psi Mud Wt In 10.60 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out 10.60 ppg PV 56 cP YP 26 Ibs/100ft2 Gels 19 \ 34 \ 42 MBT pH Sd `'° Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 .jv Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 84.30 Total Revs on Bit: Footage for Bit Run 8676 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % LS Connection Gas and Mud Cut ~~' ft units ppg ft units ppg ft units ppg '" ~~r ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg x , I ' ft units ppg ft units ppg ft units ppg , ' f, ~y p GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot x to - to to ti to _; to 24 hr Rec< - ~ Drilling ahead, work on pumps, „ .'.Logging Engineer: Steven Jenkins / Ed Jones ~ ~ uuuu units = _~ uu io vas m rrir Sp®rry Grilling Services Mudlogger's Morning Report ,.~.,.., Customer: Brooks Well: Tofkat 1 Area: North SI Lease: Explorat Rig: Nabors Job No.: AK-AM- Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ Gas" na unit: 0 unit: ( 0 units @ _,. x Sample Quality x Good ~ Fair Poor Mud Wt In 10.70 ppg Visc 124 secs API felt ', Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft `-` Bit No.: 4 Type: PDC Bit Size: 8 1/2 ~~ Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Current Lithology: 80 % SH 10 % SLTST Range Petroleum Report No.: 20 Date: 04/03/2008 ope Depth 13173 ion Footage Last 24 hrs: 0 27 Rig Activity: TD-POOH 5672885 Report For: Mr Larry Daily Cost $2,375 Pump and Flow Data 0 )Pumps na spm Flow rate na gpm •"' 0 ) Pump Capacity na gps, Pump Liner & Strk na in. '`' Pump Pres: na psi ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg 2 Gels 11 \ 24 \ 33 MBT pH Sd Jets: 6 x 13 x x TFA: 0.778 Total Revs on Bit: Footage for Bit Run 9054 Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ft units ppg ft units ppg ft units ft units ppg ft units ppg ft units ft units ppg ft units ppg ft units Depth GAS PEAKS Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< Finish POOH, rig up for running e-logs.... ppg Pp9 ppg ppg ~< rt. ;k Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Gas in units Customer: Brooks Range : 21 Petroleum Report No 1~~~~~~~~,~~~: ~ Well: Tofkat 1 . Date: 04/03/2008 ' Sp®rry drilling services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TD-POOH Job No.: AK-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm ,' ! Gas" na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ~~;' ( ) Pump Liner & Strk na in. y ~~. Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg ":. Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd % '< `~_ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `s Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST % % `` x< Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg f ~~ ft units ppg ft units ppg ft units ppg ft .units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm ~~ Max Background C1 C2 C3 C4 Tot C5 Tot ~= } ` to ~ to } to - to k to 24 h r Rec~ Finish POOH, ri u for runnin a-lo s.... '' .~ ,L., =; Logging Engineer: Steven Jenkins / Ed Jones '' 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 22 _ ~~°~~'®'~'~'~'°'~'~ Well: Tofkat 1 Date: 05/03!2008 Sperry drilling 'Sarv:ces Area: North Slope Depth 13173 ~, Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TD-POOH AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 y'' '~' x` Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 Gas" na unit: 0 unit: ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 124 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd -` ''' Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg ~' Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot , y 24 hr Rec~ '' Did BOP test, and be in runnin a-lo s on d sF Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Sp@rry ~r~lling Services Mudlogger's Morning Report 0500 Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm Gas' na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.70 ppg Visc 130 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 26 Ibsl100ft2 Gels 11 \ 25 \ 37 MBT pH Sd .. ,:, bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST Connection Gas and Mud Cut 10 % SST J ~'I ~i ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg w. ft units ppg ft units ppg ft units ppg ,. t::T -. _- > .:. •~~ GAS PEAKS - Depth Gas in units Chromatograph in ppm ~,~, Max Background C1 C2 C3 C4 Tot C5 Tot to to ~= to to '~' to .~ 24 hr Recs ,~ POOH from a loQainq on drill pipe.... !I Logging Engineer: Steven Jenkins / Ed Jones Customer: Brooks Range Petroleum Report No.: 23 Well: Tofkat 1 Date: 06/03/2008 Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Customer: Brooks Range Petroleum Report No.: 24 _ '~~°~°'' ~'"' `°°' } ~ Well: Tofkat 1 Date: 07/03/2008 Sperry Grilling Services Area: North Slope Depth 13173 .y Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Loggin g rt Job No.: AK-AM-5672885 Report For: Mr Larry ;~ Mudlogger's Morning Report Daily Cost $2,375 ~; '' Current 24 hr Avg 24 hr Max Pump and Flow Data - '~ R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm :'' "' Gas" na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres; na psi : ~.< _ ;_. - Mud Wt In 10.70 ppg Visc 130 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg . Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd `~, Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 '~- Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 3? Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm - Magnet Recover Lbs to to Feet of Fill on Bottom: ft ~~ . Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg '` ft units ppg ft units ppg ft units ppg :~ r ._ _ , _ ; , _. ~, GAS PEAKS F Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot ` to '~ to to to r1_ to .,~ - - -'~ ,. 24 hr Rec~ POOH from a to in on drill i e.... r' , : xi :4 Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range : 25 Petroleum Report No ` _ _ ~~'~°~' ~' ~~~ ~~ ~ ~ Well: Tofkat 1 . Date: 08/03/2008 Sp@rry drilling services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Loggin g Job No.: AK-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data °, 'R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm '' ' : Gas" na unit; 0 unit; ( 0 u nits @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. ~, Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.70 ppg Visc 180 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 62 cP YP 20 Ibs/100ft2 Gels 11 1 25 \ 35 MBT pH Sd - - % ~'' ,, '~ ;~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `~ Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm - Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ~ ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ,< ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg : .:; GAS PEAKS ' ~ Depth Gas in units Chromatograph in ppm ~ Max Background C1 C2 C3 C4 Tot C5 Tot } to ; to t0 e "t`k t0 - 3c ' t 24 hr Rec~ ~ E-Lo in on drill i e.. _ ~~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air '` Customer: Brooks Range Petroleum Report No.: 26 ~' ''"'~~~ ~ ~'" ~ Well: Tofkat 1 Date: 09/03/2008 Sperry drilling se~..~~es Area: North Slope Depth 13173 ,~ Lease: Exploration Footage Last 24 hrs: 0 `~ Rig: Nabors 27 Rig Activity: E-Logging '~: ~'~ Job No.: AK-AM-5672885 Report For: Mr tarry { Mudlogger's Morning Report Daily Cost $2,375 , ; ~`~` Current 24 hr Avg 24 hr Max Pump and Flow Data ~~ R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm _ Gas* na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps .'; "` ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poo r Pump Pres: na psi ~.._ _ .. ;r; _~ Mud Wt In 10.80 ppg Visc 155 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg f Mud Wt Out na ppg PV 53 cP YP 27 Ibs/100ft2 Gels 10 \ 23 \ 33 MBT pH Sd % :` .rr ,. ;, 4. 3 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 s Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 !. Trip Depth: ~ ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft ,, _ , ,. ., Current Lithology: 80 % SH 10 % SLTST 10 % SST ., . j ~ Connection Gas and Mud Cut ~ ft units ppg ft units ppg ft units ppg ~`~ ft units ppg ft units ppg ft units ppg '~~ ft units ppg ft units ppg ft units ppg ;t s ft units ppg ft units ppg ft units ppg ~;. ` K ,j ~~ GAS PEAKS Y r; y Depth Gas in units Chromatograph in ppm ?; ", K: _: ~ Max Background C1 C2 C3 C4 Tot C5 Tot . `~ to -~ to to =a ~ to ` 3 24 hr Rec~ "< E-Lo in on drill i e.. Current) POOH w/core uns.. ``' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ' ~, _ - Customer: Brooks Range : 27 Petroleum Report No _ r'"~ ? '~° ~ ~' ~~ ~ ' ~ ~ ' `- Well: Tofkat 1 . Date: 10/03/2008 - Sp®rry frilling Services Area: North Slope Depth 13173 s~ Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Loggin g Job No.: AK-AM-5672885 Report For: Mr Larry .. Mudlogger's Morning Report Daily Cost $2,375 ;: s Current 24 hr Avg 24 hr Max Pump and Flow Data +~' R.O.P. na ftlhr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm ;' `:= Gas" na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps '. " ( ) Pump Liner & Strk na in. `* Sample Quality x Good ~ Fair Poor Pump Pres: na psi ,; Mud Wt In 10.70 ppg Visc 146 secs AP I felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 57 cP YP 22 Ibs/100ft2 Gels 11 \ 22 \ 30 MBT pH Sd '" Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778. ~=~ Wt On Bit: 9.00 .RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 r '~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm ~~ Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ~;~ ft units ppg ft units ppg ft units ppg vY ft units ppg ft units ppg ft units ppg _- ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ., 1_ , , ~~ GAS PEAKS 'i ~"' Depth Gas in units Chromatograph in ppm '~~ Max Background C1 C2 C3 C4 Tot C5 Tot ~~ f ~ to to to to t~ to 24 hr Rec< E-Lo in on drill i e.. ,.3 :'. '~' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 28 Customer: Brooks Range Petroleum Report No _ ~~'''~°'~~ ~ ~ . Well: Tofkat 1 Date: 11/03/2008 Sperry Grilling Services Area: North Slope Depth 13173 - Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm Gas" na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps Sample Quality x Good ~ ( Fair Poor ) Pump Liner & Strk na in. Pump Pres; na psi Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd , Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `-` Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg - GAS PEAKS ''~ Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to _ to to 24 hr Rec~ `'` Continued E-Logging... I Logging Engineer: Steven Jenkins / Ed Jones 100~o urnts = 1 uu~io vas m Hir Customer: Brooks Range Petroleum Report No.: 29 _ _ ~~~~''~~°~' ~~' °~~~~' '~ Well: Tofkat 1 Date: 12/03/2008 'Sperry drilling services Area: North Slope Depth 13173 _ - Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: E-Logging AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 =~ ~` ~` ,,. Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 Gas" na unit: 0 unit: ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na Pump Capacity na Pump Liner & Strk na Pump Pres: na psi gpm gps in. ;':' ,. -.Y ,. r .. Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd ppg " Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 f Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: Mud Cut: ppg Short Trip CI: to Feet of Fill on Bottom: ppm ppm ft Current Lithology: 80 % SH 10 % SLTST 10 % SST ~~,~ .f. Y: - Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ppg ppg ppg ~" `` ~~' r{ Y, ,,k Depth Gas in units Max Background to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot i a~ r to to :_ to to _. ~:, .: a. . >. _ _ _ 24 hr Rec~ Continued E-Lo in on drill i e.... °a 4e i. .l '~ ~1 '-~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 30 Customer: Brooks Range Petroleum Report No _ `'~"° ~° ~ ~ ~. ~ "~ ~ ~ ~ -~ . Well: Tofkat 1 Date: 13/03/2008 Sparr~y Grilling sB.-vices Area: North Slope Depth 13173 _ Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 ' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas' 23 unit: 0 unit; ( 209 units @ 3752 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres; 1335 psi _< ~.. ;~`; Mud Wt In 10.70 ppg Visc 270 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg PV 76 cP YP 26 Ibs/100ft2 Gels 15 \ 37 \ 39 MBT pH Sd % ,- : ~: Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft - Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg __ y GAS PEAKS Depth Gas in units Chromatograph in ppm MaX Background C1 C2 C3 C4 Tot C5 Tot to t0 t0 t0 t0 ' 4 y ?'~ `+ 24 hr Rec~ Stage in the hole for cement rob... 4~' '~ .., ;; '~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 31 Brooks Range Petroleum Report No __ -'~~'~j~' '~ ' ~~ Well: . Tofkat 1 Date: 14!03/2008 Sperry drilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH, _ Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data -Y ~~ R.O.P. na ft/hr 0 ft/hr ( 0 ftJhr @ 0 ) Pumps 65 spm Flow rate 274 gpm <' ' Gas" 2 unit: 0 unit: ( 8414 units @ 10200 ) Pump Capacity 401 gps -' < ( ) Pump Liner & Strk na in. ~. Sample Quality x Good ~ Fair Poor Pump Pres: 1335 psi Mud Wt In 10.80 ppg Visc 221 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg <; ~~- Mud Wt Out 10.70 ppg PV 66 cP YP 34 Ibs/100ft2 Gels 14 \ 34 \ 35 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg - ft units ppg ft units ppg ft units ppg ~; +~_ GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot ~~ to ,. ; ;~ to , to to to '~ 24 hr Rec~ '' Sta a in hole, Circulate bottoms u ,max as 8414 units. Pum 2 cmt lu s, circ btm u ,POOH.. ;, w a _ ~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ' Customer: Brooks Range Petroleum Report No.: 32 _ 3." ~"'1`°'~'?~'~°` '\ ~ Well: Tofkat 1 Date: 15!03/2008 ~';~ Sperry i'~rilling Services Area: North Slope Depth 13173 ,:~. '~ Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Rig UP for Cmt Y Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $2,375 . , Current 24 hr Avg 24 hr Max Pump and Flow Data '~ R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 65 spm Flow rate 274 gpm ''< ~`~'_ Gas* 2 unit: 0 unit: ( 417 units @ 9920 ) Pump Capacity 401 gps , ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 1335 psi Y Mud Wt In 10.80 ppg Visc 275 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.8 ppg " Mud Wt Out 0.00 ppg PV 66 cP YP 34 Ibs/100ft2 Gels 15 \ 36 \ 36 MBT pH Sd t ~;" Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 °~ Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 `* Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft 'r,. Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg Depth Gas in units Max Background to to to to to 24 hr Rec~ TIH, to cmt. 9950 ft. circulate hole, Max as ft units ppg ft ft units ppg ft ft units ppg ft ft units ppg ft GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot urnts ppg units ppg units ppg units ppg 417 units.POOH, R/U BHA w/ cmt stin er & TIH.. { '<; ~: i ~' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 33 Customer: Brooks Range Petroleum Report No ~~~~~~ ~,~J ~~ . Well: Tofkat 1 Date: 16/03/2008 Sperry Grilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 '`' Rig: Nabors 27 Rig Activity: Rig UP for Cmt Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $2,375 ' , t Current 24 hr Avg 24 hr Max Pump and Flow Data ~'w R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 57 spm Flow rate 161 gpm ;x Gas` 45 unit: 0 unit: ( 62 units @ 6540 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. ,~- Sample Quality x Good ~ Fair Poor Pump Pres: 601 psi ~~ Mud Wt In 10.80 ppg Visc 265 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg ;~ Mud Wt Out 10.90 ppg PV 64 cP YP 32 Ibs/100ft2 Gels 16 \ 35 \ 36 MBT pH Sd `4 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ~:; Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm _~ Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg - GAS PEAKS >= Depth Gas in units Chromatograph in ppm ~` ~` Max Background C1 C2 C3 C4 Tot C5 Tot j., to '~: to to to - - to ~; 24 hr Rec~ ~~' Set 3rd cmt lu ,POOH to set 4th lu , circ btm u ,set lu .POOH. a }; ~; Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 34 T '~~~'''~ Well: Tofkat 1 Date: 17/03/2008 ~` Sp®rry Grilling SBrvGces Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT s Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $2,375 . r ,. .. ., . .. Current 24 hr Avg 24 hr Max Pump and Flow Data `' R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 40 spm Flow rate 140 gpm , `' Gas` 2 unit; 0 unit: ( 20 units @ 5055 ) Pump Capacity 4.01 gps ;. ( ) Pump Liner & Strk na in Sample Quality x Good ~ Fair Poor Pump Pres: 588 psi • . , , . , .. -. ,~. ~ ~;_ _ ~• . d N Mud Wt In 10.90 ppg Visc 260 secs API felt ml HTHP 3:0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.90 ppg PV 67 cP YP 26 Ibs/100ft2 Gels 18 \ 35 \ 36 MBT pH Sd % `K ~ <. ... _ _ ~~ `~.l f~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `< Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 ': 7, .~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm ~ _ Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Litholo 80 % SH 10 % SLTST 10 % SST 9Y~ - .. Connection Gas and Mud Cut '~{ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ,r ,: GAS PEAKS '; y •'~~ Depth Gas in units Chromatograph in ppm • a ~ Max Background C1 C2 C3 C4 Tot C5 Tot _ r < c to ~ ,a i to t0 fir;; ~~ r. t0 t0 .` • .t ~ 3 "7 24 hr Rec< TIH, circ btm u ,cement, ull into cs ,service ri .. y4 :.. s ~ Yf ~c uE ' ' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~ Customer: Brooks Range Petroleum Report No.: 35 i _ _ _ ~~`~~~~~"~' ~'"' ~ Well: Tofkat 1 Date: 18/03/2008 Sperry f~7rilling s®rvices Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 ~~'~ Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack ^~ Mudlogger's Morning Report 375 Daily Cost $2 , ,. ..., ~. , , . _ _ ., . ..~ . Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 fUhr @ 0 ) Pumps 49 spm Flow rate 204 gpm '`: ~~ Gas* na unit: 0 unit: ( 25 units @ 6120 ) Pump Capacity 4.01 gps -`.' ( ) Pump Liner & Strk na in. z Sample Quality x Good ~ Fair Poor Pump Pres: 488 psi ~3 ., ~ _ ,. . _ _ ~ ~ ~; _. .~ . , '~ - .... ~ ~ .. , . .. 1 v Mud Wt In 10.80 ppg Visc 200 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.80 ppg PV 58 cP YP 16 Ibs/100ft2 Gels 13 \ 24 \ 25 MBT pH Sd % - - ''~~ ~., ,~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 '; ~''` , Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 'l . 1! : ~ - ,:. ; :.. ,...:: ~, ,. ~ ,... ,~.:,:.1 j ;zt,. ..:r.. ,i ~~ ''t.. Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft r ~~ ~~ .- Current Lithology: 80 % SH 10 % SLTST 10 % SST 4 `r ,~~ ~~ c Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg y GAS PEAKS ;; ~` Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to %w to ''~ to ss to '~ .H4,~a 'i ~frE~ ~ - :f:~.y d t '•.:,? ~ s y v~ ~Z f hl ~ s '~ 1 ~~.~~~'t 1 _ • -. ~, F ~._ z ,. ". 24 hr Rec< Service ri , sli & cut drill line, I/d cmt bha, /u olish ass , TIH, wash and ream, circ btm u ,POOH.. / Ed Jones 10000 units = 100% Gas In Air nkin in J L E i St g even e s ogg ng neer: d" '' - Customer: Brooks Range Petroleum Report No.: 36 ' ~'~"°~'' " Well: Tofkat 1 Date: 19/03/2008 _-~ Sperry Grilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $3,075 ~;ti Current 24 hr Avg 24 hr Max Pump and Flow Data ,;~_= R.O.P. na ft/hr 0 ftlhr ( 0 ft/hr @ 0 ) Pumps 38 spm Flow rate 188 gpm '`~' Gas* na unit: 0 unit; ( 15 u nits @ 6120 } Pump Capacity 4.01 gps ' t ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 380 psi Mud Wt In 10.10 ppg Visc 154 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 50 cP YP 20 Ibs/100ft2 Gels 11 \ 23 \ 24 MBT pH Sd :' Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 :~<~ Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 ~~ ~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft `~' Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut _'~ ft units ppg ft units ppg ft units ppg ' ft units ppg ft units ppg ft units ppg ^5` ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg i,4 `~ GAS PEAKS '' Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 3' t0 t0 ~ t0 7 ~ t0 L~ Ti .. - `~ 24 hr Rec~ a Circulate and r/u for cmt. S of isolation lu ooh, s of shoe lu ooh, circ and clean finish POOH... ~; ,~'4 Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 37 _ _ ~~'®' ~ ' ~ Well: Tofkat 1A Date: 20/03/2008 Sperry Grilling Se~..~~es Area: North Slope Depth 3897 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daity Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm r Gas'` na unit; 0 unit: ( 15 units @ 6120 ) Pump Capacity 4.01 gps '" ( ) Pump Liner & Strk na in. ' ; >~ Sample Quality x Good ~ Fair Poor Pump Pres: 0 psi _ Mud Wt In 9.90 ppg Visc 156 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg ,:r f Mud Wt Out ppg PV 49 cP YP 23 Ibs/100ft2 Gels 11 \ 22 \ 25 MBT pH Sd r` Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ~.r '<. Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run r Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm 4 Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg , { GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to ~" to to to s to .. .., - „, 24 hr Rec~ Test BOP's, m/u BHA, load nuke sorces, TIH ... rF u L. ~~ ' <' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ` Customer: Brooks Range Petroleum Report No.: 38 _ ~`~~~~~~y~~ Well: Tofkat 1A Date: 21/03/2008 Sperry Drilling s@.-vices Area: North Slope Depth 3897 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Cmt Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 ~~` Current 24 hr Avg 24 hr Max Pump and Flow Data l ~; ' R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm ;<: Gas" na unit: 0 unit; ( 15 units @ 6120 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 0 psi Mud Wt In 10.00 ppg Visc 152 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg Mud Wt Out ppg PV 49 cP YP 22 Ibs/100ft2 Gels 10 1 19 \ 25 MBT pH Sd ilk :~ Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 •~ '~ : UJt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run _ ;r Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST % % i Connection Gas and Mud Cut ',; ft units ppg ft units ppg ft units ppg a ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~~ ft units ppg ft units ppg ft units ppg GAS PEAKS 7 Depth Gas in units Chromatograph in ppm 4 Max Background C1 C2 C3 C4 Tot C5 Tot ''Y ~t to :5e'. tO :Y~} V t0 jj t~ ~ t~ + -t:. - 24 hr Rec~ TIH to to cmt, none found, circulate and POOH, la down MWD, m/u bha w/cmt stin er and TIH.. Circ8~ Clean y= cement and pull up hole, circ & clean hole, POOH... .} _ - Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 39 _ ~'~ Well: Tofkat 1A Date: 22/03/2008 Sp®rry drilling Services Area: North Slope Depth 4732 Lease: Exploration Footage Last 24 hrs: 762 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr JackKeener - - Mudlogger's Morning Report Daily Cost $3,075 r - Current 24 hr Avg 24 hr Max Pump and Flow Data ~: ~`` R.O.P. na ft/hr 105 ft/hr ( 414 ft/hr @ 4245 ) Pumps 0 spm Flow rate 0 gpm r> Gas" 4 unit: 75 unit: ( 104 units @ 4550 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. .~'• Sample Quality x Good ~ Fair Poor Pump Pres; o psi ., ; T ~ Mud Wt In 9.90 ppg Visc 179 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 9.90 ppg PV 60 cP YP 27 Ibs/100ft2 Gels 17 \ 38 \ 0 MBT pH Sd - - t- .: , ';1 *' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 4 °~ !1Vt On Bit: 2.00 RPM: 70 Hrs. On Bit: 9.10 Total Revs on Bit: Footage for Bit Run 762 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm {z; Short Trip Depth 4732 ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CIySt 30 % SLTST 10 % SD Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg 3 ft units ppg ft units ppg ft units ppg - ;~' GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot '~ to to to { ~,.. to hfi -~` to ~` 24 hr Rec~ TIH, be in kick off, drillin ahead... short tri „ yk t ~f `' ~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air - Customer: : 40 Brooks Range Petroleum Report No '~'~°~~ ~ ~ Well: Tofkat 1A . Date: 23/03/2008 v! Sperry drilling Services Area: North SIo a .Depth 6066 Lease: Exploration Footage Last 24 hrs: 1334 .4u"• Rig: Nabors 27 Rig Activity: Short Trip s Job No.: AK-AM-5672885 Report For: Mr JackKeener =~ . ; Mudlogger's Morning Report Daily Cost $3,075 r> "'z ~. h. :f Current 24 hr Avg 24 hr Max Pump and Flow Data ~~ 'R.O.P. 125 ft/hr 55.5 ft/hr ( 425 ft/hr @ 5855 ) Pumps 64/64 spm Flow rate 542 gpm :{ Gas* 245 unit; 110 unit; ( 834 u nits @ 5873 ) Pump Capacity 4.01 gps ;,• ( ) Pump Liner & Strk na in. h Sample Quality x Good ~ Fair Poor Pump Pres: 2974 psi Y i Q ~~ Mud Wt In 10.10 ppg Visc 119 secs API felt ml HT HP 3.0 ml Mud Wt at Max Gas 10.0 ppg `y Mud Wt Out 10.10 ppg PV 49 cP YP 23 Ibs/100ft2 Gels 13 \ 26 \ 0 MBT pH Sd % - '_ ~: ,,. Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ~` ~Nt On Bit: 2.00 RPM: 70 Hrs. On Bit: 15.50 Total Revs on Bit: Footage for Bit Run 1334 ,; ~; , rh•;~~ r Trip Depth: ft Trip Gas: Mu d Cut: ppg Trip CI: ppm `~~ Short Trip Depth 4732 ft Short Trip Gas: 429 Mu d Cut: na ppg Short Trip CI: ppm ;t Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % CIySt 40 % SLTST 20 % SD ~' Connection. Gas and Mud Cut ~~ Y= 5873 ft 834 units 9.9 ppg ft units ppg ft units ppg -<~ ~z 5683 ft 429 units 9.9 ppg ft units ppg ft units ppg ~+': ft units ppg ft units ppg ft units ppg ~. '~~` ft units ppg ft units ppg ft units ppg ;~~ fv ~~~~ GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to a to `r to to 7'c "` ~ ~ fi 24 hr Rec< °; '~ Drillin Ahead, short tri s as needed, um re air, drillin ahead... 5 , ~t $ H: t ~ ~-,'m ~I' "; Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air '- - : - _. .. _ - - : 41 Customer: Brooks Range Petroleum Report No _ 3o3®j ~'°~' ~ . Well: Tofkat 1A Date: 24/03/2008 ?. Sperry drilling Servic@s Area: North Slope Depth 7778 Lease: Exploration Footage Last 24 hrs: 1712 ~~ Rig: Nabors 27 Rig Activity: Short Trip. Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data :~' R.O.P. 82 ft/hr 71.3 ft/hr ( 339 ft/hr @ 7113 ) Pumps 64/64 spm Flow rate 535 gpm `,' Gas" 47 unit: 68 unit: ( 144 units @ 6599 ) Pump Capacity 4.01 gps .-; ( ) Pump Liner & Strk na in. ; ` Sample Quality x Good ~ Fair Poor Pump Pres: 3185 psi Mud Wt In 10.00 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg ~r ;: Mud Wt Out 10.00 ppg PV 51 cP YP 27 Ibs/100ft2 Gels 13 \ 25 \ 0 MBT pH Sd % - - . Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 `r '`~' Wt On Bit: 2.00 RPM: 50 Hrs. On Bit: 26.50 Total Revs on Bit: Footage for Bit Run 3046 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm rr Short Trip Depth 7778 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm '"} Magnet Recover Lbs to to Feet of Fill on Bottom: ft ,Y Current Lithology: 50 % CIySt 40 % SLTST 10 % SD % % •_ ,' Connection Gas and Mud Cut ,~~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ., _ s ;,3 GAS PEAKS '' ~~ Depth Gas in units Chromatograph in ppm ' ,;~ Max Background C1 C2 C3 C4 Tot C5 Tot 5 '` to ~~ to to to ' ~ to 5 . - .. ~~= 24 hr Rec< r Drillin Ahead, short tri as directed, drillin ahead..... <.~. y` ;, Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 42 _ '~'`~~°l°' ` ~' ~ Well: Tofkat 1 A Date: 25/03/2008 '. sP®r-r-y drilling sB.-vices Area: North Slope Depth 9582 Lease: Exploration Footage Last 24 hrs: 1804 ''` Rig: Nabors 27 Rig Activity: Drilling Ahead Job No.: AK-AM-5672885 Report For: Mr JackKeener ., Mudlogger's Morning Report Daily Cost $3,075 F .. ,. `~`t! Current 24 hr Avg 24 hr Max Pump and Flow Data ~:-' R.O.P. 279 ft/hr 75.2 ft/hr ( 355 ft/hr @ 8626 ) Pumps 64/64 spm Flow rate 521 gpm .-° '% Gas* 72 unit: 68 unit: ( 165 u nits @ 9358 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. `: 'y ~- Sample Quality x Good ~ Fair Poor Pump Pres: 3218 psi ,. :: ~ , .. ,. _ :, Mud Wt In 9.90 ppg Visc 86 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.0 ppg s. Mud Wt Out 1.0.00 ppg PV 32 cP YP 17 Ibs/100ft2 Gels 11 \ 25 \ 0 MBT pH Sd :T ~. ;' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 =~ ~Nt On Bit: 10.00 RPM: 50 Hrs. On Bit: 37.10 Total Revs on Bit: Footage for Bit Run 4850 , , ,,. `~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm ;s Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm ',* Magnet Recover Lbs to to Feet of Fill on Bottom: ft -- Current Lithology: 50 % CIySt 40 % SLTST 10 % SST ' Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg { 'r,°r ,; GAS PEAKS Depth Gas in units Chromatograph in ppm '~`' Max Background C1 C2 C3 C4 Tot C5 Tot ~;~ to 'Y tO ~~ t~ '.r t0 .A~ t0 24 hr Rec~ Drillin Ahead, short tri 20 Stnds, drillin ahead... .. ~ 7 . ;~ ' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 43 _ "~'' ~ ''~ Well: Tofkat 1A Date:. 26/03/2008 `-~ sP®rry Drilling s®.-vices Area: North Slope. Depth 11298 Lease: Exploration Footage Last 24 hrs: 1716 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 -.. _ -_ . .. Current 24 hr Avg 24 hr Max Pump and Flow Data T '`' R.O.P. na ft/hr 114.4 ft/hr ( 392 ft/hr @ 10436 ) Pumps na spm Flow rate na gpm 4 Gas" 4 unit: 68 unit: ( 512 units @ 10175 ) Pump Capacity 4.01 gps .. ( ) Pump Liner & Strk na in. ~~ Sample Quality x Good ~ Fair Poor Pump Pres: na psi ~~ Mud Wt In 10.00 ppg Visc 85 secs API felt ml HT HP 2.4 ml Mud Wt at Max Gas 10.0 ppg ~` _r Mud Wt Out 10.00 ppg PV 31 cP YP 22 Ibs/100ft2 Gels 15 \ 28 \ 34 MBT pH Sd -~ Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 :=~,"~ Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 ,;T Trip Depth: ft Trip Gas: Mu d Cut: ppg Trip CI: ppm ~ Short Trip Depth 8821 ft Short Trip Gas: 123 Mu d Cut: na ppg Short Trip CI: 43K ppm r Magnet Recover Lbs to to Feet of Fill on Bottom: ft s Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ,~ GAS PEAKS j Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot :~ , `: t0 ~'. t0 :'~' t0 t0 ,v t0 24 hr Rec~ Drillin ahead, TD well 11298 ft. Circulate and Clean well, POOH. 4 T Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 44 _ ~'~''~''~ Well: Tofkat 1A Date: 27/03/2008 Sperry Grilling SBrVICBS Area: North Slope Depth 11298 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH r Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 ~;, ~ . 5 Current 24 hr Avg 24 hr Max Pump and Flow Data -''` R.O.P. na ft/hr na ff/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm „~ Gas* na unit: na unit: ( na u nits @ ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. A Sample Quality x Good ~ Fair Poor Pump Pres: na psi { Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 33 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd ``~ Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 . :.~ t.e Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg 1 - L.ti GAS PEAKS F ~~ Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to r to °~ to 24 hr Rec< Finish POOH, Test BOP's, TIH , Sli and Cut.... ,~ ~°; ,.~ t, } >: Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 45 Customer: Brooks Range Petroleum Report No a _ ~~`~'~~' ~ `'~ ~ ' ~ . Well: Tofkat 1 A Date: 28/03/2008 >~: Sperry OriUing Services Area: North Slope Depth 11298 ~ Lease: Exploration Footage Last 24 hrs: 0 `~ - Rig: Nabors 27 Rig Activity: Circ& Cond Job No.: AK-AM-5672885 Report For: Mr JackKeener ~; Mudlogger's Morning Report Daily Cost $3,075 5 T " V~= ,. ~ ~~ - ~ ;'-..-. -' 1. .. 1. .. .~,_~~ <. _~.i f -:.^." Y ~..': .. ..a..~. t Current 24 hr Avg 24 hr Max Pump and Flow Data "~ R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm .# M Gas' 4 unit: na unit: ( na units @ ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. ar Sample Quality x Good ~ Fair Poor Pump Pres: na psi ' -> Mud Wt In 10.00 ppg Visc 9o secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg ~, ' Mud Wt Out 40.00 ppg PV 32 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd `. s ,. - ,: `% Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 :~ `K s :r Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 ' - Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm }` Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST .. ~: Connection Gas and Mud Cut '~ ft units ppg ft units ppg ft units ppg - ft units ppg ft units ppg ft units ppg ;'` ft units ppg ft units ppg ft units ppg ; ,, ~~'{ : ft units ppg ft units ppg ft units ppg 'k : .; ~,.~ ' _ , - °:; GAS PEAKS U Depth Gas in units Chromatograph in ppm 'A Max Background C1 C2 C3 C4 Tot C5 Tot to ~' to ~ ~` to to _ ~~. to 24 hr Rec~ TIH, dis lace mud, circulate and condition... ~F` Logging Engineer: Steven Jenkins 1 Ed Jones 10000 units = 100% Gas In Air '. - t, } Customer: Brooks Range Petroleum Report No.: 46 r _ "`~~°'"~~ ~'`~ Well: Tofkat 1A Date: 29/03/2008 t;~ spar~y drilling Services Area: North Slope Depth 11298 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Set Cmt.. Job No.: AK-AM-5672885 Report For: Larry Meyers s Mudlogger's Morning Report Daily Cost $3,075 5 r " r z Current 24 hr Avg 24 hr Max Pump and Flow Data << R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm ~` Gas* 4 unit: na unit; ( na u nits @ ) Pump Capacity 4.01 gps ~~ ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi ~~ Mud Wt In 10.00 ppg Visc 8o secs API felt ml HTHP ml Mud Wt at Max Gas 10.0 ppg ~~ Mud Wt Out 10.00 ppg PV 16 cP YP 38 Ibs/100ft2 Gels 26 \ 28 \ 33 MBT pH Sd }. . Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Y ~.: Wt On Bit: .10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm j ~y Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm `~ Magnet Recover Lbs to t0 Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg z r ft units ppg ft units ppg ft units ppg e .f, ~ - ~ GAS PEAKS Depth Gas in units Chromatograph in ppm ='~' Max Background C1 C2 C3 C4 Tot C5 Tot to ~' to ~~ to ~: to y to r ~_ ~ 1, ,.: <:.. .. .. _, . . >~ 24 hr Rec~ - - TIH with 2 7/8 in tubin ,circulate and ri u and set cement lu ,POOH and I/d tubin and wait on cmt.. s ;,, '~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 47 Brooks Range Petroleum Report No "~~'~"~"'' $ ~'~ ~ Well: Tofkat 1 B . Date: 30/03/2008 Sperry drilling Services Area: North Slope Depth 4200 ~~ udlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TIH AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 _ ., .. ~< (, ' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na ft/hr @ Gas" 4 unit: na unit: ( 10 units @ ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na Pump Capacity 4.01 Pump Liner & Strk na Pump Pres; na psi gpm gps in. -~ ~ '~ ppg Mud Wt In 10.00 Mud Wt Out 10.00 ppg ecs API felt ml HTHP ml Mud Wt at Max Gas 10.0 ppg Visc 180 s PV 58 cP YP 29 Ibs/100ft2 Gels 16 \ 38 \ 42 MBT pH Sd . t :; Bit No.: 1 Type: Wt On Bit: 10.00 RPM: PDC Bit Size: Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 otal Revs on Bit: Footage for Bit Run T I f ° Trip Depth: Short Trip Depth Magnet Recover Lbs ft Trip Gas: ft Short Trip Gas: to Mud Cut: ppg Trip CI: Mud Cut: na ppg Short Trip CI: to Feet of Fill on Bottom: ppm ppm ft ~~- Current Lithology: 50 % CIySt 40 % SLTST 10 % SST _ `- ~` Connection Gas and Mud Cut ft urnts ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ft units ppg ppg ft units ppg ft units ppg ft units P9 ppg ppg ppg ' . - , _ t C~ ~~_~ Depth Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot ,,: ~, J ~ to I to to to :~ 24 hr Rec~ Finish cmt, Test BOP's, M/U new BHA, load nukes, TIH, Shallow Test, contd TIH , ~' i' r' z ~~: 'Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~~ ,- ~ , Customer: Brooks Range Petroleum Report No.: 48 ~'" `~ '~ Well: Tofkat 1 B Date: 31/03/2008 Sperry i~rilling Sarvic~s Area: North Slope Depth 5502 Lease: Exploration Footage Last 24 hrs: 1302 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 108.5 ft/hr ( 515 ft/hr @ 4519 ) Pumps 62/67 spm Flow rate 546 gpm Gas" 11 unit: 95 unit; ( 123 units @ 5405 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 2920 psi ,... Mud Wt In 10.00 ppg Visc 125 secs API Tilt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg ~" Mud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT pH Sd s ~ - k .. , ,_ _ . . -~ ' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 5.60 Total Revs on Bit: Footage for Bit Run 1302 t Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm '' i Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm h Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST ;'~ Connection Gas and Mud Cut :` ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg `'' ft units .ppg ft units ppg ft units ppg '~~ ft units ppg ft units ppg ft units ppg :~ . = { Depth GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot k, ,. - ~ - ft Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 49 _ ~~o Well: Tofkat 1B Date: 01/04/2008 Sperry Drilling Services Area: North Slope Depth 7975 Lease. Exploration Footage Last 24 hrs: 2473 .~ Rig: Nabors 27 Rig Activity: Short Trip r Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger's Morning Report Daily Cost $3,075 ,, ' Current 24 hr Avg 24 hr Max Pump and Flow Data ~,' R.O.P. 211 ft/hr 103 ft/hr ( 809 ft/hr @ 7814 ) Pumps 57/67 spm Flow rate 525 gpm r ' Gas" 121 unit: 88 unit: ( 250 units @ 7855 ) Pump Capacity 4.01 gps y ( ) Pump Liner & Strk na in. ~^ Sample Quality x Good ~ Fair Poor Pump Pres: 3377 psi ~ . Mud Wt In 10.00 ppg Visc 125 secs API felt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg '~ ' Mud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT pH Sd ~ "_` Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 12-15K RPM: 60 Hrs. On Bit: 16.70 Total Revs on Bit: Footage for Bit Run 3775 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm '~ Short Trip Depth 7975 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % CIySt 50 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg x ft units ppg ft units ppg ft units ppg ., ft units ppg ft units ppg ft units ppg ,; .:~ _ _ ,_,. ~ ; , « . =" = GAS PEAKS -r~ Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot k, ~` to >' to ' a ~~ to to to 24 hr Rec~ , drillin ahead, short tri 7975 ft ,y ;~ $c x ~I ~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air t Customer: Brooks Range Petroleum Report No.: 50 _ ~°°~~ Well: Tofkat 1B Date: 02/04/2008 Sp~~ry drilling SBr..icBS Area: North Slope Depth 9492 - udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1517 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 .° . , : ;~ ~'~ ,' Current 24 hr Avg 24 hr Max R.O.P. 185 ft/hr 182.8 ft/hr ( 207 ft/hr @ 8722 ) Gas" 130 unit; 111 unit; ( 435 units @ 8900 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 61/68 spm Flow rate 547 gpm Pump Capacity 4.01 gps' Pump Liner & Strk na in. Pump Pres; 3786 psi -; `r ', Mud Wt In 10.00 ppg Visc 120 secs API Tilt ml HTHP 3.2 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 47 cP YP 25 Ibs/100ft2 Gels 20 \ 34 \ 41 MBT pH Sd "y: Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 12-15K RPM: 60 Hrs. On Bit: 25.00 Total Revs on Bit: Footage for Bit Run 5292 - Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7975 ft Short Trip Gas: 223 Mud Cut: na ppg Short Trip CI: 43k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST t `'' Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~~ ~F GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to _ ~;' 24 hr Rec~ TIH f/short tri , STG 223, Drillin Ahead, Short Tri 9492'. t `' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 51 '~ Well: Tofkat 16 Date: 03/04/2008 Sperry Drilling Services Area: North Slope Depth 10785 Lease: Exploration Footage Last 24 hrs: 1293 Rig: Nabors 27 Rig Activity: CO Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data '~~ R.O.P. 185 ft/hr 161.6 fUhr ( 470 ft/hr @ 9673 ) Pumps 61/68 spm Flow rate 547 gpm ~~ >:' Gas" 4 unit; 94 unit: ( 250 u nits @ 9915 ) Pump Capacity 4.01 gps <.'; ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 3786 psi Mud Wt In 10.00 ppg Visc 127 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 52 cP YP 26 Ibs/100ft2 Gels 18 \ 37 \ ## MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ! ' Wt On Bit: 12-15K RPM: 60 Hrs. On Bit: 33.00 Total Revs on Bit: Footage for Bit Run 5292 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 9492 ft Short Trip Gas: 141 Mud Cut: na ppg Short Trip CI: 43k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % SST 40 % SLTST 20 % SD Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ~y, ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~' ;:y ~~! Depth Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to '~ to - ~; to to '3 24 hr Rec~ Drillin ahead, losin mud, well flowin ,increase MW, decrease MW, CO, Pum LCM around.. Fi `i' `~: ~~ Logging Engineer: Steven Jenkins / Ed Jones 10000 urnts = 100% Gas In Air : 52 Customer: Brooks Range Petroleum Report No ~~ ~L~m ~- ' '`3 . Well: Tofkat 1 B Date: 04/04/2008 Sperry ~ritling SBrvices Area: North Slope Depth 12442 udlogger s Morning Report Lease: Exploration Footage Last 24 hrs: 1707 Rig: Nabors 27 Rig Activity: drilling ahead Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 -. ' ~~~ - Current 24 hr Avg 24 hr Max R.O.P. 113 ft/hr 71 ft/hr ( 226 ft/hr @ 12216 ) Gas" 58 unit: 62 unit: ( 113 units @ 11962 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/65 spm Flow rate 522 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi ; 5 Mud Wt In 9.80 ppg Visc 120 secs API felt ml HTHP 3.3 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 9.90 ppg PV 39 cP YP 26 Ibs/100ft2 Gels 20 \ 31 \ 37 MBT pH Sd % _ I Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM; 90 Hrs. On Bit: 43.10 Total Revs on Bit: Footage for Bit Run 6999 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft - Current Lithology: 60 % SH 30 % SLTST 10 % SD ;, Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg :r GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to t0 t0 t0 t ~- 24 hr Rec< Drillin Ahead.... `` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 53 X1,1 ` ~ ~ Well: Tofkat 1 B Date: 05/04/2008 spBrry Drilling Services Area: North Slope Depth 13770 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 1328 Nabors 27 Rig Activity: drilling ahead AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 ~' ~' Current 24 hr Avg 24 hr Max R.O.P. 113 ft/hr 126.5 ft/hr ( 338 ft/hr @ 13296 ) Gas" 42 unit: 58 unit; ( 440 units @ 13200 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 53/62 spm Flow rate 493 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3759 psi ':- ~' Mud Wt In 9.80 ppg Visc 730 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.10 ppg PV 49 cP YP 27 Ibs/100ft2 Gels 20 \ 33 \ 40 MBT pH Sd ~?~ ', Bit No.: 1 Type: PDC Bit Size: Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 52.60 Total Revs on Bit: Footage for Bit Run 8327 ' Trip Depth: ft Trip Gas: Short Trip Depth 13200 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 440 Mud Cut: na ppg Short Trip CI: 40k ppm to Feet of Fill on Bottom: ft Current Lithology: 30 % SH 40 % SLTST 30 % SST '~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~~ ~~ Depth Gas in units Max Background 13330 to 13580 153 44 to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 11 1 1 1 - F 24 hr Rec~ ~`Y Drillin Ahead.... ,~> Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 54 _ _ ~~~~~ Well: Tofkat 16 Date: 06/04/2008 Sperry fOriiling Services Area: North Slope Depth 15099 Lease: Exploration Footage Last 24 hrs: 1329 Rig: Nabors 27 Rig Activity: drilling ahead I?; Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger's Morning Report Daily Cost $3,075 ! ~ ' Current 24 hr Avg 24 hr Max Pump and Flow Data `~ R.O.P. 133 ft/hr 126.5 ft/hr ( 226 ft/hr @ 14441 ) Pumps 52/65 spm Flow rate 491 gpm Gas" 4 unit; 47 unit: ( 178 units @ 14478 ) Pump Capacity 4.01 gps I . ( ) Pump Liner & Strk na in. '_ Sample Quality x Good ~ Fair Poor Pump Pres: 3840 psi . ~~ _ y Y Mud Wt In 9.90 ppg Visc 110 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 45 cP YP 24 Ibs/100ft2 Gels 17 \ 32 \ 40 MBT pH Sd ~, Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 9656 ,' Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm ~. ' Magnet Recover Lbs to to Feet of Fill on Bottom: ft } + 1 Current Lithology: 30 % SH 40 % SLTST 30 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg - ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ;} GAS PEAKS =~ Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to 1- I* t~ ~~,. t0 t~ - t0 24 hr Rec~ ~. • Drillin Ahead.... - ; z `Jt Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 55 ~~~1m~ Well: Tofkat 1B Date: 07/04/2008 Sperry Grilling sB~..~~®s Area: North Slope Depth 15575 Lease: Exploration Footage Last 24 hrs: 476 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger's Morning Report Daily Cost $3,075 .i YY ~~` Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 33 ft/hr ( 236 ft/hr @ 15039 ) Pumps na spm Flow rate na gpm `' Gas" na unit; 0 unit: ( 46 units @ 14815 } Pump Capacity na gps - }~ ( ) Pump Liner & Strk na in. `` ' Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 9.90 ppg Visc 110 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 44 cP YP 20 Ibs/100ft2 Gels 17 \ 35 \ 42 MBT pH Sd '~ Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ' Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 67.00 Total Revs on Bit: Footage for Bit Run 10134 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft '~f Current Lithology: 80 % SH 20 % SLTST % SST Connection Gas and Mud Cut Y ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~: ,..: _ ~ . GAS PEAKS r. Depth Gas in units Chromatograph in ppm ~` ~ ` Max Background C1 C2 C3 C4 Tot C5 Tot ' to to ` ~ to ~ to ` 24 hr Rec. i Drillin ahead, reach TD, CO, POOH s. ~~ Logging Engineer: Steven Jenkins I Ed Jones 10000 units = 100% Gas In Air 1 Sperry-Sun Tofkat 1 Surface Data Logging END OF WELL REPORT aa~-i~~ ~ 1~~~~ HALLIBURTON Sperry Drilling Services Brooks Range Petroleum Corporation Tofkat 1 Surface Data Logging END OF WELL REPORT Brooks Range Petroleum TABLE OF CONTENTS TOFKAT1 1. General Information 2. Daily Summary A. Bit Reports B. Mud Reports C. Show Reports 3. Lithology Summary A. Tops. B. Logs 4. DATA C D 5. Morning Report Brooks Range Petroleum HALLIBURTQN Sperry Drilling Services ~~ J u 1 i~ GENERAL WELL INFORMATION TOFKAT 1 Company: Brooks Range Petroleum Corporation Rig: Nabors 27E Well: Tofkat 1 Field: Exploration Borough: North Slope State: Alaska Country: United States API Number: 050-103-20567-00 Sperry-Sun Job Number: AK-AM-0005672885 Job Start Date: FEB 08 2008 Job End Date (TD): March 18 2008 Total Depth: TD 13174' MD; 7708' TVD North Reference: True Declination: 22.30° Dip Angle: 80.64° Total Field Strength: 1151.50 NT Date Of Magnetic Data: 16 Feb 2008 Wellhead Coordinates N: North 70° 13' 48.186" Wellhead Coordinates W: West 150° 47' 20.701 " RKB: 33' Ground Elevation: 19.80321' SDL Engineers: Steven Jenkins; Ian Johnstone, Ed Jones Company Geologist: Doug Hastings SSDS Unit Number: 115 ' Brooks Range Petroleum HALLIBURTON ' Sperry Drilling Services DAILY SUMMARY Brooks Range Petroleum Corporation Tofkat 1 2_ DAZLY SUMMARY TOFKAT 1 12 Feb 2008 Cont to rig up to spud. Picked up 129 joints of drill pipe. Clear rig floor, P/U BHA.RIH ' and tag bottom of conductor and started drilling. Drilled 300', POOH to P/U jars and heavy wall. RIH and drill to 826 feet. 13 Feb 2008 Drilled to 1204' POH to 180' and monitored well. Hole in good condition. RIH washing down last 95' with 2' fill on bottom. Drilled ahead and 50 to 150 feet/hr. ROP. Drilled to 2059' sliding 30 to 40' per stand and rotating the rest. ROP slowed, so two NutPlug sweeps were run with little or no ROP improvement seen. 14 Feb 2008 Dri112059' to 2166' ~ 50 to 150 ft/hr. Circ. B/U. POH to 1011'. Good displacement No problems. Monitored well. Static. POH to 89.19' and racked back. No problems. Mud caked on stabilizers, tools and bit. Bit was damaged. Cleaned BHA. RIH new bit to 275'. Serviced top drive. RIH to 2070' then WTB with no fill. Drilled to 2557' with initial ROP ~ 30 to 70 fUhr in clays 15 Feb 2008 Drilled to TD surface hole interval and 3910'. Circ. B/U. B/U and 3900' should be 5050 strokes at gauge hole or 5600 strokes at the 10% over gauge factored in for whole volumes to date. 16 Feb 2008 Short trip from interval TD of 3910.4' up to 2100'. Hole in good shape. Swept hole with NutPlug to try and gauge enlargement unsuccessfully as NutPlug arrived 200 strokes early;(Probably channeled along high side of pipe)? Pumped dry job and POOH. UD BHA. Rigged to run 9 5/8" casing. Started to RIH with casing. 17 Feb 2008 Casing ran smoothly. Landed it at 3897 feetMD;(3026.7 feet TVD) with no problem. Cemented. Waiting on cement. Cleaned pits to get ready for oil mud section. 18 Feb 2008 Waiting on cement. 19 Feb 2008 Pressure test & nipple up BOP's. M/U test joint & set test plug. Make up BHA &RIH to tag cement C~ 3805'. Set down 10K. Drill cement to 3812' &Circ. B/U. Test 9 5/8 casing with 3000 psi for 10 minutes. Good Test. Drill float collar & cement to 3840 feetMD. 20 Feb 2008 Drilling cement & shoe C~ 3897' and open hole to 3911'. Circ. mud & pump 25 bbl spacer followed by oil mud. Circulate. Pump dry job & POH for smart tools. P/U & load BHA. Load nukes into tool. RIH with DC & HWDP to 1053'. Test MWD tool. Blow down Top-drive. P/U singles of DP to 3894'. Drill to 3931'. Circ. B/U C~ 500 gpm and 3800 psi. Leak off test. Formation leak off ~ 820 psi=15.3 PPG EMW. 21 Feb Drilled to 4898'[440 gpm C~ 3800 psi; 2-10K WOB. Rotating wt=100K]. Circ. B/U for trip to shoe. No trip problems. Drilled to 5860';[up wt. 145K:dwn wt.100K:Rot wt. 115K:WOB=8-12]. Circ.460 gpm X3680 off btm; 3950 on btm; Circ. 1.5 x B/U. POH to 4897'. Tight out ~ 5250,5080,4900. RIH to 5860' WTB f/5760'. No problems. (1000 units connection gas ~ 6000' after trip). 22 Feb Drill f/6100-6822'. Circ.C~1 455 gpm C~1 3890 psi off btm & 4050 psi on btm. Pump sweep. POH tight ~ 6305'. Work up to 6250' pulling 50K over.Break circ. & POH to 6147'. Evidence of packing off. RIH to btm &circ. 90 minutes. POH. Tight (~ 6110' but worked through it. Monitored well ~ 5764'. RIH to btm with no problem. Drilled to 7785'.Circ.@ 445 gpm ~ 3880 psi off btm & 4100 psi on btm. ROP=200-250'/hr. n DAILY SUMMARY Brooks Range Totkat 1, Tofkat lA, and Tofkat 1B 23 Feb Circ. sweep. & 3 B/U. Pump dry job. POH to 6053' with tight spots worked easily, though tight ~ 6250'MD. RIH to btm with no problem washing 100'. No fill. Drill to 8747'; [Torque on 6- 7K/off 5-6K;up wt 190K:dwn wt. 110K:Rotating wt. 135K:445 gpmC~3880 psi]. Circ. sweep. POH to 7688'; 20-30K drag after 8100'.Work & comes slick.RlH with no problem. Drilled to 8940'. ' 24 Feb Drilled to 10,092';[WOB 8-10K,TQ on 8K,TQ off 6-7K,420 gpm C4- 3900 psi,Up wt. 225K,Down wt. 150K,Rotating wt.120K.Circ. sweep ~ 430 gpm ~ 4000 psi. POH to 8450' laying down 4" DP. Working tight (~ 8450' pulled 30,000 over to free. Continue POH. [ROP average =142.29] 25 Feb POH tight ~ 8743'[up wt. 195K:dwn wt. 110K]. POH f/8459 to 7200' but pipe wet. Pump dry job. POH. Tight f/6300 to 6000'. Pipe wet. Circ. out pills with 4000 strokes. POH to 1000' using SuperSucker to clean OBM from joints and working pipe to keep slug falling. UD HWDP & jars. Remove nuclear source. 26 Feb Completed laying down all 4" drill pipe. Clear/clean rig floor. Rack and talley 5" drill pipe. RIH picking up 111 joints 5" drill pipe. POH, standing back 5" drill pipe in the derrick. Test BOP. No fluid treatments today. Hole taking proper fill while laying down and picking up drill pipe. No losses. 27 Feb Finish testing BOP, Koomey test OK. Pull test plug set, wear bush lock down, blow down choke and kill line, PU BHA, circulate to check MWD tools, RIH w/5" DP, circulated at the shoe, cut and slip drill line, service top drive, cont. RIH. Monitoring while tripping back in the hole with 5" ~I DP. 28 Feb Cont RIH w/ 5" DP, circulate and condition tight hole, PU 5" to 7815', circulate, PU 5" DP to 8625', circulate, PU 5" DP to 8761', Cont RIH, wash and ream, drill ahead from 10092' to 10603'. Monitoring while tripping back in the hole with 5" DP. Running centrifuges at all times while drilling and circulating to maintain proper weight. Encountered many "sticky" spots while running in, especially around 6000'-6300'. Circulating in these spots brings sand across the shakers. 29 Feb Drilling ahead, circulate to clean hole, short trip of 11 stands, break circulation, ream last stand, continue drilling ahead, swab out of #1 mud pump, rotate and slide. Running centrifuges as needed while drilling. 243 bbls of fluid lost yesterday, built some fluid on the rig and ordered 290 bbls f/mud plant to make it to TD w/sufficient volume of fluid in the pits. 1 Mar Cont drilling ahead to 12050', circulate BU for short trip, continue drilling to 12415', rot and slide to 12630', control drill to 12698', clean suction screens both pumps, continue drilling ahead to 12794', change swab and pulsation dampners in pumps. Maintain volume, weight, and rheological properties specified in the well program. Centrifuge's have been down due to mechanical problems. No reported losses to the formation. 2 Mar Circulating while working on #2 pump to change pulsation dampner and swabs. Trouble shoot MWD tool, MAD Pass, control drilling, 12793' to 13174'. Circulate and pumped a Hi Vis Weighted sweep. Observed well. Pumped a dry job, short trip, circulate 3 BU, observed the well. Pumped a dry job, and POOH. Pumped a 20 Bbi Hi Vis Weighted sweep. Circulated 3 BU for cleaning hole. Pumped 20 Bbl dry job, and POOH. No reported losses to the formation. 3 Mar POOH, UD BHA, RU wire line scheves, PU logging tools, RU to log the well. No losses to the formation while tripping out of the hole, The well is TD'd at 13,174'. The rig crew is currently working on the mud pumps and will be performing maintenance and repair on the equipment in the pits over the neat few days as the well is logged. 2 DAILY SUMMARY Brooks Range Totkat 1, Totkat lA, and Tofkat 1B 4 Mar Logging Well, Rig crews will be pertorming maintenance and repair on the equipment in the pits as the well is logged. ~' 5 Mar Logging Well, Rig crews will be pertorming maintenance and repair on the equipment in the pits as the well is logged. Prepared two dry jobs for POOH while logging Monitoring the well for gas white logging well. 6 Mar Logging the well, Rig crews will be pertorming maintenance and repair on the equipment in the pits as the well is logged. Ordered additional mud products in preparation for drilling the sidetrack. MI Wate used for dry jobs. Centrifuged pits 3-7 until desired mud weight was achieved. Monitoring the well for gas. 7 Mar Logging Well from 10,000' to TD on drill pipe. Rig crews will be pertorming maintenance and repair on the equipment in the pits as the well is logged. Centrifuge's up and running, processing fluid as circulating allows to maintain 10.7 ppg mud. Centrifuge #2 had a broken dial and bent trigger which was repaired by the rig electrician. Prepared a dry job. Monitoring the well for Gas. 8 Mar Logged from 10,100' to TD and back. POOH to remove the side entry sub from the string. Ran back in to 12,100' and circulated 8,100 strokes to condition mud. Built a 20 bbl dry job weighing 12.7 ppg and pumped it before tripping out of the hole. Stopped POOH at 4752' to slip and cut drilling line. After sonic logging was completed, the crew pulled the side entry sub out of the string and ran back to 12,100' and circulated 8000 strokes, or one complete surface to surface volume. The mud weight is now 10.7-10.8ppg all the way around. The centrifuge ran flawlessly the entire time. MI Wate used to make a 20 bbl dry job weighing 12.7ppg. 9 Mar Cont cut and slip drilling line, POOH, LD logging tools, PU logging tools, RIH, every ten stands pumping 3 bpm for a total of ten barrels each time. At 10,189', stopped and circulated drill pipe volume per Schlumberger. MDT logging. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Monitoring well for gas. 10 Mar Cont MDT logging to 11963, POOH to 11100, cont logging to 10189, Built dry job to POOH. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Built a 2 ppb over dry job to POOH. 11 Mar Gathering MDT log's on drill pipe all day. Monitoring the well for gas. 12 Mar Logged with Schlumberger. Tested BOP's. RIH with 2 7/8" stinger tubing on end of drill- pipe to begin cementing plugs. Circ. B/U halfway in. Will RIH to 12,350 feet and spot 25 bbl. viscous HRP pill by pumping 2335 strokes to clear pill through mule shoe, then slowly pull up to 12,050 feet and circulate prior to cementing Stage 1 plug. 13 Mar RIH f/6146' to 12350' with no problems. Circ. B/U ~ spotted 25 bbl. viscous pill. POH to 12044' & rigged up cementers while circulating/conditioning mud. Placed two 82 bbl. cement plugs. Circ. B/U before pumping dry job & POH. Dry job unsuccessful. POH 'wet' from 9853'. Pumped 2nd dry job. Unsuccessful. POH 'wet'. Pumped viscous OBM/HRP pill. Added M-1 Wate for two dry jobs. r 14 Mar POH 'wet' f/3859'. UD 2 7/8" pipe;(lots of cement on pipe). MN clean out BHA &RIH tagging cement C~ 9950'. Set down with 20K weight. Circ. hole clean. POH to 845';(hole in good shape). Change out BHA to cement stinger on 2 7/8" drill-pipe. Prepare to RIH to spot 25 bbl. viscous pill and 46 bbl. cement plug. DAILY SUMMARY Brooks Range Totkat 1, Tofkat lA, and Tofkat 1B Added M-1 Wate for two dry jobs. No other treatment today. Plan Forward: Will RIH to 6660' and spot 25 bbl. viscous pill using 1326 total strokes. Will POH to 6360', and then circulate B/U of 3318 strokes. 1 Halliburton will cement isolation plug from 6360' up to 5860'. 15 Mar RIH & spot high-viscosity pill ~ 6660'. POH to 6360 & rig up cementers. Pump 15 bbl spacer; 46 bbl. 15.8 ppg cement; & chase with 15 bbl. spacer. Spotted cement ~ 6360'. POH to 5383' & circulate hole clean. Pumped dry job. POH & P/U polishing assembly. RIH to 5695'. 16 Mar Wash down looking for cement plug f/5695'-6550'. No indication? Circ. & clean hole. Green cement ~ B/U. Pump dry job & POH. Change BHA to cementing stinger. RIH to 6660'. Spot 15 bbl. viscous pill. POH to 6360'. Circ. hole clean. Pump 15 bbl spacer; then 51 bbl. cement; then 5 bbl spacer; then rig mud. 89 bbl. total displacement. M-1 Wate used for dry job. No otherr treatment today. ' 17 Mar POH. Rig Service & Slip & Cut for 2.5 hrs. UD cementing BHA & P/U polishing BHA. RIH to 5300'. Wash down 586' looking for cement;[none found]. Circ. & condition mud. WOC. Wash down to tag firm cement ~ 6153'. Circ. B/U. Pump dry job & POH. 18 Mar Contunue to POH & UD cement polishing BHA. P/U cementing BHA. RIH to 6065' & WASH TO 6146'. Circulate while rigging up cementers. Top cement isolation plug. POH to 5194'. Drop 1 ball & circulate DP volume. POH to 4718'. Spot 25 bbi. viscous pill C~ 4718'. POH to 4400'. Rig in cementers and cement shoe plug. POH to 3450'. Drop DP wiper ball & circulate. Pump dry job & POH. Added M-I Wate for dry job, and added 20 Citric Acid to cement rinsate vacuum tanker to lower pH to 10.5 for acceptance at Class I Pad 3 Disposal facility. ~~ ~I n 4 r Lithologic Summary Brooks Range Petroleum Corpoation Tofkat 1 3_ Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudlops C 0 0 n r C C 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1 272- 191 1 TV D Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Clav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1 91 1 - 2620 TV D Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 61 1 9 M D 2620- 4150 TVD Shale Wall K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, Iightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stlckey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 0 C~~ [1 0 ii Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 61 1 9- 6288 M D 4150- 4236 TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. 6288- 6401 MD 4236- 4293 TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 6401 - 6447 M D 4293- 4316 TVD Qannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 6447- 9632 M D 4316- 5921 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. 1 0 [1 Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ' S TVD-ft) ft/hr Units 0 ii 0 9632- 1 0496 M D 5921- 6352 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. 10496-10722 MD 6352- 6465 TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertley sorted, porosity, Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 10722-10988 MD 6465- 6600 TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dui white. Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 2 0 0 Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks TVD-ft 1 ft/hr Units ' 10988-11190 MD 6600- 6700 TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- ' Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain ' Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. ' 11190-11350 MD 6700-6781 TVD Top of Turbidites Base FORMATION ' SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain ' Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Light gray, fine grained to very fine grained, quartz, sub ' rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 11350-11688 MD 6781- 6955 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. ' SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace ' Dull white, Cut weak. 3 Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units 1 1 688-1 1 767 M D 6955-6995 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Mllkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, .calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. ' SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace ' Dull white, Cut weak. ' 11767-11932 MD 6995- 7027 TVD K-1 FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of glauconite. ' Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. Fluorescence: none, Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence,Dull white, Cut weak. ' 1 1 932-1 1 950 M D 7027-7089 TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular ' Poorly sorted, clear, loose, chart, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. ' Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. ' SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. ' Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ' (TVD-ft) ft/hr Units ' 1 1950- 1 2621 M D 7089- 7740 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. ' Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- ' Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white Traceof oil stain. ' SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 1 2621 - 1 2779 M D 7440- 7523 TVD BKU FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, ' sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SANDSTONE: Light gray to drark grey, very coarse grained sub- Angular, very poorley sorted, friable, moderately hard, blocky, ' Shale streaks. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace ' Dull white, Cut weak. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. SHALE: Gray to Dark gray, slightly calcareou, very silty, Fluorescence, trace weak. ' 1 2779- 1 2790 M D 7523- 7540 TVD AlpineC FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic ' Blocky, glauconite. SHALE: Gray to Brown, slightly calcareous, slighty dolomitic Slightly argillaceous, moderately hard, sucrosic, glauconite Chert. 5 Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft 1 ft/hr Units 1 2790- 1 3174 M D 7540-7731 TVD i~ i~ ii i~ J-4 FORMATION Sand: Light gray to gray, fine grained, sub angular, moderately Well sorted, moderately well sorted, moderately hard, angular, Glauconlte, pyretic, Porosity: good, Fluorescence: moderate Dull yellow, cut: moderately streaming, dull yellow, weak oil Stain. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, chart, slightly calcareou, very silty, Fluorescence, trace weak. 6 I~ ' Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ' (TVD-ft) ft/hr Units 7 i _i 7 J 7 u Customer: Brooks Ran e Petroleum Re ort No 1 °"` g . p Well: Tofkat 1 Date: 13102/2008 ~~®rwy ®rilling s®rvices Area: North Stsope Depth 1015 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1®15 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-X672885 Report For: Larry Myers !Daily Cost $3,®75 Current 24 hr Avg 24 hr Max R.O.P. 80 ft/hr 118 ft/hr ( 429 ft/hr C~ 870 ) Gas' 0 unit; 2.5 unit; ( 33 units C~ 1004 ) ( ) Sample Quality x Good ^ Fair Poor Pump and Flow Data Pumps 2 spm Flovu rate 415 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 1090 psi Mud Wt In 9.60 ppg Visc # 283 secs API Tilt ml HTHP 0.0 ml Mud Wt at Max Caas 9.6 ppg Mud Wt Out 9.70 ppg PV 40 cP YP 45 Ibs/100ft2 Gels 20 \ 55 \ 0 MBT pH 9.0 Sd °! Bit No.: 1 Type: Milltooth Bit Size: 12 1/4 .Jets: 3 x 18 1 x 13 x TF~1: 0.9420 Wt On Bit: 14-Jan RPM: 40 Hrs. On Bit: 8.6 'Total Revs on Bit: 1 k Footage fao~ Bit Rum 10~ 5 Short Trip Depth: ft Trip Gas: Mud Cut: ppg! Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ ppc,~ Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft ii - I Current Lithology: 80 % CLAY 20 % GRAVEL % % °~ i i Connection Gas and Mud Cut ft units ppg ft snits ppg ft units ppg ft units ppg ft evnits ppg ft units ppg ft units ppg ft snits ppg ft units ppg ft units ppg ft ~rnits ppg ft units ppg GAS P1~AKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 CS C~ Tot C5 Tot 712 to 730 10 tr 1009 0 0 0 C 910 to 1005 33 10 3315 _ 0 0 0 p to to to 24 hr Rec< S ud well. Drill to 1015ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units =100% Gas In Air u Customer: ort No ~ 2 Brooks Ran e Petroleum Re Well: g Tofkat 1 p Date: 14/02/2008 ~p®rry ®r~lfir+g ~®rvoces Area: North Slope Depth 2166 Mudlogger's Morning Report Lease: Rig: Job No.: ExploratiorB ;; Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1151 Rig Activity: _ wiper trip Report For: Larry Myers Daisy Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 119 fUhr ( 4i6 ft/hr C°3 1789 Gas" 67 unit: ~ 47 unit: ( 225 units ~ 1873 ( Sample Quality Good Q Fair Poor ) ) ) Pump and Flow Datae Pumps 1+2 spm Flaw rate 630 gpm Pump Capacity 4.41 gps Pump Liner & S#rk 6x12 in. Pump Pres 2300 psi -Mud Wt In 9.40 ppg Visc 152 secs API Tilt 7.0 kml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Il~ud Wt Out 9.60 ppg PV 21 cP YP 40 Ibs/100ft2 Gels 20 \ 65 \ 0 MBT pH 8.8 Sd 4.5 Bit No.: 1 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 22.9 Total Revs on Bit: Footage fc~rr Bit Run 2166 Short Trip Depth: 2166 tt Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs - to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Tripe SCI: ppm to Feef of Fill on Bottom: ft Current Lithology: 100 °4 GLAY a Connection Gas and Mud Cut ft units _ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 1513 to 1676 127 32 1795 to 1820 185 79 1867 to 1888 225 80 GAS PEAKS Chromatograph in ppm C1 02 C3 C4 Tot C5 Tot 6287 0 0 0 no data 4676 0 0 0 ('~ 1955 to 1976 209 47 8982 23 0 0 G~ to 24 hr Rec~ Drill 1015ft to 2166ft, wiper tri Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units ~ 100% Gas In Air Y ~ ~ Customer: Brooks Ran e Petroleum Re ort No : 3 WeIL• g Tofkat 1 p . Date: 15/02/2p08 Sp®rry ®rillir~g s®rvlcBS Area: North SIO~'Je Depth 2733 udlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 2~ AK-AM-5672885 Footage Last 24 hrs:: 567 Rig Activity: Drilling Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 40 ft/hr 1-0.2 ft/hr ( 187 ftlhr @ 2643 Gas' 140 unit: 70 unit: ( 181 units @ 2644 ( Sample Quality Good x^ Fair .Poor ) ) ) Purnp and Flow Data Pumps 1+2 spm Flow rate 710 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x92 in. Pump Pres 296o psi N1ud Wt In 9.60 ppg Visc 174 secs APi filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg ~.4ud Wt Out 9.60 ppg PV 20 cP YP 38 Ibs/100ft2 Gels 19 \ 60 \ 0 MBT pH 8.5 Sd 2.5 °% Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jests: 3 x 18 1 x 13 x TFA: 0.9420 10.2 Total Revs on Bit: Footage for wit Run 567 ~,, Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 299 Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip C~ ppm to Feet of Fill on Bottom: ft k: Current Lithology: 50 % CLAY 40 % CLYST 10 % SLTST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units _ppg ft units ft units ft units fit units ppg ft wits ppg ppg ft wits ppg ppg ft urtits ppg ppg ft hits ppg Depth Gas in units Max Background 2350 to 2360 93 55 2434 to 2453 103 75 2534 to 2549 153 70 GAS PEl4KS Chromatograph in ppm C1 C2 C3 C4 Tod C5 Tot 6047 28 0 0 0 6418 32 0 © 0 5363 29 0 © 0 2596 to 2675 181 72 12833 27 0 0 0 to ~~ 24 hr Rec~ Drill to 2166ft, PDH for bit Chan e. RIH but#2. Drill afhead Logging Engineer: Steven Jenkins /Ian Johnstone 101000 units = 100% Gas In Air ~~ar~r~/ ®r°illing Services Mudlogger's Morning Report Customer: Brooks Range Petroleum Report No.: 4 Well: Tofkat 1 Date: 16/02/2008 Area: North Slope Depth 3911 Lease: Exploration Footage Last 24 hrs: 1178 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: _ Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 128 ft/hr ( 336 ft/hr C~ 3127 ) Pumps 176 spm Flow rate 728 gpm Gas' na unit; 125 unit: ( 325 units C°3 2933 ) Pump Capacity 4.41 gps ( ) Pump Liner & Strk 6x12 in. Sampie Quality Good x0 Fair Poor Pump Pres: 378® psi fviud Wt In 9.60 ppg Visc 165 secs AP1 Tilt 7.0 ml HTHP 0.0 ml Mua9 Wt at Max was 9.6 ppg Mud Wt Out 9.70 ppg PV 17 cP YP 37 Ibs/100ft2 Gels 28 \ 70 \ 0 MBT pH 9.5 Sd 1.25 ®~,, Sit No.: 2 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 ^Jt On Bit: 40.00 RPM: 85 Hrs. On Bit: 21.9 Totaf Revs on Bit: Footage fc~ Bit Run 17=5 ~ -. Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: pprn Magnet Recover Lbs to to Feet of Fill on Bottom: tt ._< Current Lithology: 60 % CLAY 40 % GRAVEL Connection Gas and Mud Cut 2936 ft 325 units 9.6 ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromato~graph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 2930 to 2935 325 204 18898 324 52 0 0 3272 to 3290 206 165 26268 0 0 0 0 to 3691 to 3705 285 45 12386 63 13 0 0 3791 to 3800 188 60 14000 64 7 0 0 24 hr Rec~ Drill to 3910ft. Circ hole clean. Logging Engineer: Steven Jenkins /Ian Johnstone 100010 units = 100% Gas In Air n Customer: Brooks Range Petroleum Re ort No : 5 ~°`~ Well: Tofkat 1 p . ®ate: 17/02/2!•008 sa®r-~-~ ®roets~,g s®r~~.~o~~ Area: North Slope ®epth 3911 Mudlogger's Morning Report .~ Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Run Casing AK-AM-5672885 Report For: Jack Keener Daily Cost ;~3,0~5 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr @ Gas' na unit: unit: ( units @ ( Sample Quality Good ~ Fair Poor ) ) ) Pump and Ftow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk x12 in. Pump Pres; 378® psi Mud Wt In 9.70 ppg Visc 88 secs API fift 7.6 ml NT~iP 0.0 ml Mud Wt at Max Gas 9.~ ppg Mud Wt Out 9.70 ppg PV 27 cP YP 23 Ibs/100ft2 Gels 13 \ 55 \ 73 MBT ### pH 8.5 Sd 1.25 °~, Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 _x TFA: 0.9420 21.9 Total Revs on Bit: Footage for Bit Run 1 ~ -15 Trip Depth: 3911 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 1272 Mini Cut: ppg Trip CI: ppm Mini Cut: _ppg Short Trip CI: ppm to Feet of Fili on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL ~ -~. Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft .units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units .ppg ppg ft units ppg ~- Depth Gas in units Max Background to to to GAS PEAKS Chrcamatograph in ppm G1 C2 C3 C4 Tot C5 Tot to to 24 hr Rec~ Wi er tri . Circ hole clean. POH. Run casi~ Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Caws In Air u - Customer: : R_ Brooks Ran e Petroleum Re ort No ~ Well: g Tofkat 1 p . Date: 18/02s'~2008 ~p®wrv ®rautn9 s®wvioes Area: North Slope Depth .39'11 I udlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: Nabors 27 Rig Activity: Gasering Aft-AM-5672885 Report For: Jack {~~ener Daily Cost $3,G 75 , Current 24 hr Avg 2~ hx Max R.O.P. na ft/hr ft/hr ( ft/hr C~3 Gas* na unit: unit; ( units C~3 ( Sample Quality Good ~ Fair Poor ) ) ~ Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk sx12 in. Pump Pres: psi Mud Wt In 9.70 ppg Visc 55 secs API fist 5.0 ml HTHP 0.0 ml Mud 1Nt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Imsd100ft2 Geis 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 °-, Bit No.: Type: Bit Size: Wt On Bit: -RPM: Hrs. On Bit: Jets: x x x TFA~ Total Revs on Bit: Footage for Bit Rurv Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm t® Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL % °!° ° Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg f8 units ft units ft units fE units ppg ft units ppg. ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to GAS PEAKS Chromatograph in ppm C~ C2 C3 C4 Tot C5 Tot to to 24 hr Rec~ Run /cement casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% {has In Air i Customer: Brooks Ran e P l R rt N 7 $~ g e~ro eum epo o.: Well: Tofkat 1 ®ate: 19/02/~tJ08 s~®.-ry ®.-a'aa~,~ Sir-vices Area: North Slope ~ Depth 391 ~i udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E30f~ Job No.: AK-AM-5672885 Report For: Jacl~ Kepner Daily Cost $3,0T Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C°3 ) Gas" na unit; unit: ( units C°3 ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate: gpm Pump Capacity x-.41 gps Pump Liner & Strk Gx12 in. Pump Pres: psi Mud Wt In 9.70 ppg. Visc 55 secs API Tilt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.~ ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs1100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x x x TFda: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Muds Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Muoi Cut: _ppg Short Trip CI: p-pm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL c,~, % °/Q Connection Gas and Mud Cut ft units ppg ft units ppg ft units Pp9 ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chro~natograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to >_ 24 hr Rec~ cement casin . N/U BOP. Test BOP Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100°i6 G as In Air i Customer: Brooks Ran e Petroleum Re ort Imo B g p .: '"° Well: Tofkat 1 Date: 20/02,008 sp®rry ®rilfie-ag S~rvic~s Area: Narrth Slope Dep#h 391;•' 1 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Circu~te ~ ' Job No.: AK-AM-5672885 Report For: Jack I<erener Mudlogger s Morning Report ~~_~~ Daily Cost $3,0 r~ 5 Current 24 hr Avg 24 hr Max Pump and Flog Data R.O.P. na ft/hr ft/hr ( ft/hr C~ ) Pumps 120 spm Flow rate .526 gpm Gas` na unit: unit: ( units C°3 } Pump Capacity x.41 gps ( ) Pump Liner & Strk x12 in. Sample Quality Good ~ Fair Poor Pump Pres; 920 psi Mud Wt In 9.70 ppg Visc 55 secs API Tilt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9_7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs1100ft2 Gels 1 \ 2 \ 2 MBT pH 9.0 Sd 0.25 Bit No.: 3 Type: HTC GTi Bit Size: 8 1l2 Jets: x x x TFA: OPEN Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: ~ Fooorage for Bit Run r. Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bo>#tom: ft Current Lithology: 60 % CLAY 40 % GRAVEL 96 %° °~ _:5: Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg- ft units ppg GAS PEAKS Depth Gas in units Chrorna#ograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Test BOP. RIH. M/U pipe, RIH and drill cement, float and shoe to 3911ft. Displace to O-BM Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Comas In Air t Customer: Broaks Range Petroleum Report Nm 9 Well: Tofkat 1 Date: 2 1 /0 2/2 0 018 s~®rry ®r~ot®ng s®we.~ces Area: North Slope Depth 448 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 569 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Jack Ke~n~;r Daily Cost $3,Oc ~ Current 24 hr Avg 24 hr Max R.O.P. 320 ft/hr 213 ft/hr ( 373 ft/hr C~3 4079 ) Gas' 113 unit: 68 unit: ( 139 units @ 4323 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 112 spm Flow rate 47~ gym Pump Capacity 4.4.1 gps Pump Liner & Strk 6x~-2 in. Pump Pres: 3760 psi Mud Wt In 10.10 ppg Visc 190 secs API fill ml HTHP 2.0 ml Mud Wt at Max Gas 1Q_1 ppg Mud Wt Out 10.10 ppg PV 39 cP YP 18 Ibs/100ft2 Gels 11 \ 22 \ 24 MBT pH Sd G.25 Sao Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 13.778 Wt On Bit: 8.00 RPM: 72 Hrs. On Bit: 2.7 Total Revs on Bit: Footage for Bit Run 569 Trip Depth: 3911 ft Trip Gas: 22 Mud Cut: ppg Trip CI: pprra Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 100 % CLYST % % % % Connection Gas and Mud Cut ft units ppg ft units ppg ff units ppgt ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units Pp9 GAS PEAKS Depth Gas in units Chrornatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 4096 to 4130 111 50 8598 0 0 0 0 4315 to 4348 139 74 9717 0 0 0 0 to to to 24 hr Rec~ PDH bit3. RIH bit4. Drill 39121ft to 3931ft. Leak off test. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone ~t0000 units = 100% C~a~ In Air Customer: Brooks Range Petroleum Report No : 10 ~~~ (~ . Well: Tofkat 1 Date: 22/02/20Q~3 S~ser-r-y OrellGng ~er..~c~s Area: North Slope Depth 6716 udlogger's Morning Report 05:00 Lease: Exploration Footage Last 24 hrs: 2236 Rig: NaboFS 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For:. Jack Keenea~r Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 225 ft/hr 219 ft/hr ( 670 ft/hr @ 5184 ) Gas* 329 unit: 315 unit: ( 1001 units @ 6004 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow ^wata Pumps 107 spm Flow rate 4354_ gpm Pump Capacity 4.4'x' gps Pump Liner & Strk 6x1! in. Pump Pres: 4090 psi Mud Wt In 10.00 ppg Visc 118 secs API felt ml HTHP 2.0 ml Mud Wt at Mix Gas 10.1 mpg Mud Wt Out 10.10 ppg PV 46 cP YP 23 Ibs/100ft2 Gels 17 q 28 \ 28 MBT pHl Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x _ TFA: E)r.778 Wt On Bit: 5.00 RPM: 81 Hrs. On Bit: 12.97 Total Revs on Bit: Footage for Bit Run 2805 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 5855 ft Short Trip Gas: 413 Mud Cut: 10.1 ppg Short Trip CI: 31689 ppm Magnet Recover Lbs to to Feet of Fill on Bott~rn: ft Current Lithology: 80 % CLYST 20 % SLTST Connection Gas and Mud Cut 5956 ft 965 units 10.1 ppg ft units ppg ft units ppg 6053 ft 984 units 10.1 ppg ft units ppg ft units ppg 6147 ft 975 units 10.1 ppg ft units ppg ft units ppg 6244 ft 720 units 10.1 ppg ft units ppg ft units ppg GASm PEAKS Depth Gas in units Chromatog~aph in ppm Max Background C1 C2 CS C4 Tot C5 Tca~ 5294 to 5311 243 211 19118 141 77 0 0 5573 to 5669 389 262 29955 624 1 Tt 0 0 5901 to 5936 950 417 64610 4281 260f5 347 2 5975 to 6007 1001 520 65701 5083 322$ 488 34 6296 to 6343 702 422 47539 4016 2684 381 3 24 hr Rec~ Drill ahead. Wiper trips at 4906ft, 5855ft. Contraction ases seen after wiper trip at 5855ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone '~ 10000 uni9~ = 100% Gam in Air 0 -- Customer: Brooks Range Petroleum Report No.: 11 Uzi' ~ ~~~` ~~'~ - ~~' Well: Tofkat 1 Date: 23/02/2008 Sperry o.-~u:ng ser.~~ces Area: North Slope Depth 7785 Mudlogger's Morning Report goo Lease: Exploration Footage Last 24 hrs: 1069 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,000 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 158 ft/hr ( 306 ft/hr @ 7584 ) Gas* na unit: 136 unit: ( 327 units @ 6717 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 110 spm Flow rate 454 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3990 psi Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10:1 ppg Mud Wt Out 10.00 ppg PV 35 cP YP 23 Ibs/100ft2 Gels 13 \ 22 \ 22 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 19.72 Total Revs on Bit: Footage for Bit Run 3874 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLYST 30 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drill ahead. Wiper trips at 6813ft, 7785ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air [l Customer: Brooks Ran : 12 e Petroleum Re ort No .Y ~, }_~ ., . ~ '~~~~~~ ~ ~~ ~ ~` ~ ~~ ""~~~ p . g Well: Tofkat 1 Date: 24/02/2008 Sperry drilling 'Services Area: North Slope Depth 9227 Mudlogger's Morning Report 0o Lease: Exploratiion Footage Last 24 hrs: 1441 Rig: Nabors 27 Rig Activity: Drilling Ahead Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 120 ft/hr ( 306 ft/hr @ 7584 ) Gas" 72 unit: 151 unit: ( 151 units @ 3940 ) ( ) Sample Quality x Good ~ Fair u~r Pump and Flow Data Pumps 105 spm Flaw rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Prv~: 40i,~ psi Mud Wt In 10.00 ppg Visc 9o secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 30 cP YP 22 Ibs/100ft2 Gels 11 \ 18 \ 0 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 30.70 Total Revs on Bit: Footage for Bit Run 5313 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % CLYST 40 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft snits ppg ft units ppg ft units ppg ft omits ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 89461 ft. a Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ; ~' Customer: Brooks Range Petroleum Report No.: 13 ,_ _ ~ ,~ ~~a.L~ 3W ~C- " ~ Well: Tofkat 1 Date: 25/02/2008 spar.-y ®r-aoi~P,9 se.-..~~es Area: North Slope Depth 10092 udlogger's Morning Report os•oo Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 865 Rig Activity: POOH Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R,O.P. na ft/hr 72 ft/hr ( 149 ft/hr @ 9858 Gas* na unit: 55 unit; ( 76 units @ 9486 ( Sample Quality x Gaod 0- Fair Poor ) ) ) Pump and Flow Data Pumps 105 spm Flow rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 4065 .;. psi Mud Wt In 10.00 ppg Visc 66 secs API filt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd `% . Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage foF Bit Run 6175~_S Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: pp~n Mud Cut: ppg Short Trip Ct: ppfrn to Feet of Fill on Bottom: ~t Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ~ ft units ft units ft units ppg ft snits ppg ppg ft units ppg ppg ft snits ppg ppg ft wnits ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drill ahead. Wiper trips at 6813ft, 7785ft. 8940 ft. Sto drl , circ btm u ,be in POOH, L/D dp. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air -- Customer: Brooks Range Petroleum Report No.: 14 ~`~°~ ~~~' ~ - ~~ ~ Well: Tofkat 1 Date: 26/02/2008 Sperry drilling Ser.aces Area: North Slope Depth 10092 udlogger's Morning Report 05.0 Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: POOH Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas* na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ :Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft .units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 8940 ft. finish POOH.. La down MWD. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 1~+ ~ `~~~'~' ''` ~~~~ `~~ ^~~ ' Well: Tofkat 1 Date: 27/02/20018 spe.-.-y ®r~n~~g serV;~es Area: North Slope Depth 10092 udlogger's Morning Report 05 ~ 00 Lease: Rig: Job No.: Exploratian Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: BOP test Report For: Jack Keener Oaily Cost $3,x75 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas* na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flaw rate na gpm Pump Capacity na gps Pump Liner ~ Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 103.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH S~ Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 .Jets: 6 x 13 x x TFA~ 03.778 38.20 Total Revs on Bit: Footage for Bit Run F~175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg. Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 °/ CLYST 30 % SLTST 25 % SST % °~% Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft ` units ft snits ft units ft units ppg ft units ppg ppg. ft units ppg ppg ft units- ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 8940 ft Test BOP's Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas 1n Air Customer: Brooks Range Petroleum Report No.: 16 1 ~ ~"-' [~ _z ~ `~ ~ ' ' u Well: Tafkat 1 Date: 28/02/008 Sperry ®rilleng ServicBS Area: North Slope Depth 10092 udlogger's Morning Report 05'00 Lease: Rig: Job No.: Exploration Nabors 27 AID-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: Wash and Rearxa Report For: Jack Keener Daily Gost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas* na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Ftov~r Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 76 secs API felt ml HTHP 1.5 ml Mud Wt at Marx Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 20 cP YP 17 Ibs7100ft2 Gels 6 ~ 16 \ 20 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 172 Jets: 6 x 13 x x TFA: 0.778 38.0 Total Revs on Bit= Footage for Bit Run 6175;_5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trig CI: ppm to Feet of Fill on Bottonn: ft Current Lithology: 45 % CLYST 30 % GLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft .units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chramatograph in ppm C't C2 C3 C4 Tot C5 Tot 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. &940 ff. TIH to bottom, wash and ream... Logging Engineer: Steven Jenkins / Ed Jones 10000 unity = 100% Gas In :,Air Customer: : 17 Brooks Range Petroleum Report No ~~ ~ i-'E``~I~_~'~5` ~ ~ ~;~~~~ Well: . T®fkat 1 Qa#e: 29/02J2008 Sperry ®rauong ser..~Ces Area: M1[orth Slope [~pth 10Q92 Mudlogger's Morning Report 05' 0 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 798 Labors 27 Rig Activity: Wash arad Ream AK-AM-5672885 Report For: Jack keener Daily Cost $3,Q75 Current 24 hr Avg 24 hr Max R.O.P. 139 ft/hr 80 ft/hr ( 246 ft/hr @ 10668 ~ Gas* 129 unit; 245 unit: ( 2400 units @ 10092 j ( ~ Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flovr rate 534 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 3414 psi Mud Wt In 10.35 ppg Mud Wt Out 10.35 ppg Visc so secs API felt ml HTHP 3.1 ml Mud Wt at Max Gas 1'D.1 ppg PV 27 cP YP 18 Ibs/100ft2 Gels 3 \ 4 \ 9 MBT pH Sd Bit No.: 4 Type: Wt On Bit: 9.00 RPM: PDC Bit Size: 81 Hrs. On Bit: 8 7/2 Jets: 6 x 13 x x TFA: 0.77 45.30 Total Revs on Bit: Footage for Bit Run 693 Trip Depth: 10092 Short Trip Depth Magnet Recover Lbs ft Trip Gas: ft Short Trip Gas: to Mud Cut: ppg Trip CI: pp+m Mud Cut: ppg Short Trip CI: ppxn #o Feet of Fill on Bottom: ft Current Lithology: 50 % CLYST 30 % SLTST 20 °fm SST % %o Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units. ppg ft units ppg ft units ppg ft units ppg Depth to to Gas in units Max Background GAS PEAKS Chromatograph in ppm G1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drillin Ahead Logging Engineer: Steven Jenkins / Ed Jones '" 10000 units = 100°fo Gas In rAir ~ ~s~~i~ ~~I ~ _ _ .- - Sperry drilling Services Customer: Brooks Range Petroleum Report No.: 18 Well: Tofkat 1 Date: 03/01/2'D08 Area: North Slope Depth 1207 Lease: Exploration Fo®t age Last 24 hrs: 978 Rig: Nabors 27 Rig Activity: Drill Ahead Job No.: AK-AM-5672885 Report For• Mr Larry Mudlogger's Morning Report II Daily Cost _ $3,07 05.0 0 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. 204 ft/hr 45 ft/hr ( 334 fUhr @ 12000 ) Pumps 57/70 spm Flow rate S34 gpm Gas* 25 unit; 45 unit: ( 186 units @ 11938 ) Pump Capacity 4..41 gp~s ( ) Pump Liner & Strk 6 xc 12 in. Sample Quality x Good ~ Fair Poor Purnp Rres: 3414 psi Mud Wt In 10.40 ppg Visc 94 secs API felt ml HTHP 3.5 ml Mud Wt at Max Gas 10.1$ ppg Mud Wt Out 10.40 ppg PV 36 cP YP 16 Ibs/100ft2 Gels 5 1 11 \ 17 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 62.30 Total Revs on Bit: Footage for Bit Run 7951 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ~ ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % SH 40 % SLTST 20 ~,/o SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth 11938 to 11940 to to to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 186 40 8 1 1 1 24 hr Rec< Drilling Ahead,Work on Pumps, Dril Ahead Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air __ : 19 e Petroleum Report No Customer: Brooks Ran ~ ~ ~ ,~ 9 ~ _ '~~ ~~~~ ~~~iY~ _ . g Well: Tofkat 1 Date: 02/03/2008 Sp@PPy ®~~nvn9 ServGoes Area: North Slope Depth 12795 Mudlogger's Morning Report f)5•o Lease: Exploration Footage Last 24 hrs: 725 Rig: Nabors 27 Rig Activity: Drili Ahead Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 30 ft/hr ( 289 ft/hr @ 12115 ) Gas* 7 unit; 18 unit: ( 25 units @ 12504 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 74 spm Flow rate 311 gpnn Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 2131 psi Mud Wt In 10.60 ppg Visc 147 secs API felt ml HTHP 3.0 mt Mud Wt at Max Gas 10.6 ppg Mud Wt Out 10.60 ppg PV 56 cP YP 26 Ibs/100ft2 Gels 19 \ 34 \ 42 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 84.30 Total Revs on Bit: Footage for Bit Run 8676 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 1D % LS Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot t to _ t0 J t0 l t0 t0 i 24 hr Rec< Drillin ahead, work on pum s, r Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air n Customer: Brooks Range Petroleum Report Nc~.: 20 Well: Tofkat 1 Date: 04/03/2(?08 Sperry a7rilling services Area: North Slope Depth 13173 udlogger's Morning Report 05.00 Lease:. Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TD-POQH AK-AM-5672885 Report Farr: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 Gas" na unif: 0 unit: ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor } ) ) Pump and Flow Data Pumps na spm Flow rate raa gpr~~ Pump Capacity rya gps Pump Liner & Strk na ire. Pump Pres: na psi , Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3.0 ml Mud Wt a€t Max Gas 10.G ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: .ppg Shoat Trip CI: ppm to Feet of Fill on B®ttom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg. ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot CS Tot to to to 24 hr Rec~ Finish POOH, ri up for runnin a-lo s.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks R~~nge Petroleum Report No.: 21 _, ~ ~ f~ _`--~ ~"~~ v_~' ~ Well: Tofkat 1 Date: D4/03/2008 Sperry ®rilleng s~rveces Area: North SlOpxe Depth 13173 udlogger's Morning Report 05'00 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Riig Activity: TD-POOH AK-AM-572885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ftlhr @ 0 Gas" na unit: 0 unit: ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps rya spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 124 secs API filt ml HTHP 3.0 ml Mud Wt at Max Gays 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT_pH Sd °do Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 T®tal Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip Ct_ pprn to Feet orf Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 ®/o SST % % Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft urats ft units ft ucaits ft units ppg ft remits ppg ppg ft omits ppg ppg ft uanits ppg ppg ft t,mits ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 l"ot C5 Tot to to to 24 hr Recs Finish POOH, ri up for runnin a-lo s.... Logging Engineer: Steven Jenkins / Ed Jones 90000 units = 100% Gas In Air J Customer: : 22 Brooks Range Petroleurr~ Report No ~~~-~~~~~'~°~~~~~'~~~' ~ Well: Tofkat 1 . Date: 05/03/2D08 Sperry drilling S~rvioes Area: North Siope Depth 13173 udlogger's Morning Report 05'00 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TD-POOH AK-AM-5672885 Report For: Mr Larry Dat31y Cost $2,375 Current 24 hr Avg 24 hr Marc R.O.P. na ft/hr 0 ft/hr ( 0 ftlhr @ 0 Gas* na unit; 0 unit: ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Purrap Capacity na gps Pump Liner & Strk ~a in. Pump Pres: na psi ' Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP S.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.78 102.30 Total Revs on Bit: Footage fog Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs tc~ Mud Cut: ppg Trip CL ippm Mud Cut: ppg Short Trip CI: fpm to Feet a4F Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg. ft units ppg ppg ft units ;ppg ppg ft units :ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C41i-ot C5 Tot. 24 hr Rec< Did BOP test, and be in runnin a-fo son dp. Logging Engineer: Steven Jenkins / Ed Jones 1!0000 units = 100%: Gas n Air Customer: Brooks Ran e Petroleum Re ort No : 23 ~~~"~'~ '~° `u ' ` ~'~~ g p . Well: Tofkat 1 Date: 06/03/2008 Sperry ®r~n:ng se.-vooes Area: North Slope Depth 13173 udlogger's Morning Report 05'00 Lease: Exploration Footage LastF 24 hrs: 0 Rig: Nabors 27 Rig .Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft3'hr @ 0 ) Gas* na unit: 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na$ psi Mud Wt In 10.70 ppg Visc 13o secs APf felt ml HTHP 3.0 ml Mugd Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: Qi.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 902.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of F"~ on Bottom: ft Current Lithology: 80 % SH 10 °/® SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ POOH from a to in on drill i e.... Logging Engineer: Steven Jenkins / Ed Jones 10CP00 units = 100% Gas In Air ii Customer: Brooks Rar e Petroleum Re ort No : 24 - g p . Well: Tofkat 1 Date:. 0/03/2008 Sperry ®rilling Services Area: 6Vorth Slope Depth 13173 Mudlogger's Morning Report 05.00 Lease: Exploration Footage Last 24 hrs: 0 Rig: !Nabors 27 Rig /Activity: E-Logging Job No.: ~4K-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ff/h~ @ 0 ) Gas* na unit: 0 unit: ( 0 units @ 0 ) ( ) Sample Quality. x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 130 secs API filt rnl HTHP 3.0 ml Mud Wt at Max Gas: 10.6- ppg Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0`_778 Wt On Bit: 9.00. RPM: 70 Hrs. On Bit: 1U2.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet o€ Fib on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft un~s ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft ants ppg ft units ppg ff units ppg ft units ppg GAS PEA~(S Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ POOH from a to in on drill i e.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air C! L~~ Customer: gooks Range Petroleum Report Rio.: 25 ~~~§_~ ~'' ~' ~~~~~~'i Well: Tofkat 1 Djate: 08/03/2008 steer-r-y ®r-~a'vn~ sue.-..aces Area: ~Jorth Slope Depth 13173 Lease: exploration Footage Last 24 ihrs: 0 Rig: OVabors 27 Rig Activity: E-Lagging Job No.: s~K-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cosh $2,375 1 Current 24 hr Avg 24• hr Max Pump and Flaow Data i R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr~r @ 0 ) Pumps na spm Flow rate na gpm 'i Gas* na unit; 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.70 ppg Visc 180 secs API ml HTHP 3.0 ml -Mud Vvft at Max Gas 10.6 ppg Mud Wt Out na ppg PV 62 cP YP 20 ~s/100ft2 GeEs 11 \ 25 \ 35 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: ~ 1/2 Jets: 6 x 13 x _x TFA: 0.778 Bit: Wt O 00 9 RPM: 70 On Bit: Hrs 12.30 Total Rews on Bit: Footage for Bit Run 9054 n . . Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg short Trip CI: pprn Magnet Recover Lbs to to Feet of Fill o~ Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST `°1° Connection Gas and Mud Cut ft units ppg units ppg ft units ppg ft units ppg $ units ppg ft units ppg ft units ppg ~ units ppg ft units ppg ft units ppg ~ units ppg ft units ppg GAS PEAKS Depth Gas in units Ghromatog~raph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ E-Loaainq on drill Logging Engineer: Steven Jenkins / Ed Jones 1000E7 units = 100% Gas In Air ~ , 2B ... Customer: Report helo.: Bro©ks Range Petroleum Date: pg/03/20~8 ,.~ 1 Well: ~--~ < Toflcat 1 Depth 1317 sperry ®r;,;®,~~ ser..eces Area: North Slope Footage Last 24 hrs: loration Ex g i [ Lease: p Rig Activity: ng E-Logg r Rig: Nabors 27 Report Far: Mr Lar ° Job No.: AK-AM-5672885 .l Cosh $2,375 ~- Mudlogger's Morning Report Dar y •oo Pump and Flow Data Current 24 hr Avg 24 hr Max sPm Flow rate °a 0 ) pumps ~ ~~ ~_ft/hr R.O.P. 0_ft/hr ( 0_ft/hr @ its @ _ ria p ) Pump Capacity gps an Gas* na unit: _,_____ 0_unit: ( 0 un na ) Pump Liner & Strk . _ Sample Quality x Good ( Fair Poor Pump Pres:~_ Psi l HTHP 3.0 ml Mud Wt at Max Gas 't6!-S ppg ` Mud Wt In 10.80 ppg Visc 155 secs API fitt 27 Ibs/100ft2 m ~ ~ 33 MBT pH Gels 10 \ 23 ~ Mud Wt Out na ppg PV 53 cP YP ' x TF,A: 0.77'8 4 Type: PDC Bit Size: 8 1/2 x Jets: 6 x 13 _~_,_ Footage for Bit Rein it 9h'15~ Bit No.: _ On Bit: 102.30 70 Hrs : Total Revs on B Wt On Bit: 9.00 RPM: . - --1 Mud Cut: ppg Try CI: ~ Trip Depth: ft Trip Gas: Mud Cut: Staort Trip CL _~ ppg _t~P~ ft Short Trip Depth ft Short Trip Gas: to Feet of Fill on IBottom: Magnet Recover to _- 0 % SH 10 % SLTST 10 SST °~, °l° Current Lithology: 8 Connection Gas and Mud Cut units ft I?P9 ft _ ~ units ppg ----~' units PP9 ft un is ppg tt units ppg ----ft units p"P9 - ft units ppg f# units ppg units ft PP9 - ~ units ppg _--~-- w units pP9 SAS PEAKS Gas in units Chr©matograph in ppm Depth C2 C3 C4 Tot. C5 Tot Max Background C11 i t0 .----- i0 24 hr Rec< E-Loggin og n drill Currently POOH w/core i ~,nn~nn Fnaineer: Steven Jenkins / Ed Jones 100t~D units = 9Ofl% Gail 9n Ai ___---- Customer: Brooks Range Petroleum Report No.- 27 ~ ~``~~` -' ~~ Well: Tof~at 1 Date: 10/03/2f1~s08 Sperry ~rillin~ services Area: North Slope Deptr~ 1317 udlogger's Morning Report 0 •n Lease: Exploration Footage Last 24 trrsa 0 Rig: Nat~ors 27 Rig Activity E-Logging Job No.: AK-AM-5672885 Report Fors Mr Larrga Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr ~a 0 ) Gas* na unit: 0 unit: ( 0 units ~ 0 ) _ ~(' ) Sample Quality x Good ~ Fair' ' Poor Pump and Flow 7ata Pumps na sprt~ Flow rate ~a gpm Pump Capacity rya gps Pump Liner & Strk a~,a in. Pump Pres: na pski - Mud Wt In 10.70 ppg Visc 146 secs API felt ml HTHP 3.0 and Mud Wt at'f1Aax Gas 10:~ ppg Mud Wt Out na ppg PV 57 cP YP 22 Ibs/'tOOft2 Gels 11 \ 22 1 30 MBT p"~ Sd Bit No.: ~ 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.3 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Muc€ Cut:- ppg Trip CI: ppm Short drip Depth ft Short Trip Gas: Much Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Botztom: ft Current Lithology: 80 % SH 10 % SLTST 10 °~ SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg it units ppg CAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ E-Lo in on drill pipe.. Logging Engineer: Steven Jenkins / Ed Jones 10000 a.anits = 100% Gas In Air ~, u ' Customer: Bro k R P t l 28 R t N ~ ~~'~ `"w '~~ ~ o s ange e ro eum epor o.: Well: Tofkat 1 Date: 11 /03/2008 Sperry pr;;;;ng sg.-v;ces Area: North Slope Depth 13173 Mudlogger's Morning Report . o Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ff/hr ( 0 ft/hr @ 0 ) Gas* na unit: 0 unit; ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor ~ Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres; na psi , '. Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft: units ppg ft units ppg ft units a ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units _ Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to _ to to to 24 hr Rec< Continued E-Lo in .. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 29 ~~~~~, ~'~~ Well: g Tofkat 1 p . Date: 12/03/2008 Sperry drilling Servica3ss Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Mudlogger's Morning Report Job No.: AK-AM-56725 Report For: Daily Cost Mr Larry $2,375 Current 24 F~ Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ d ) Pumps na spm Flow rate na gpm Gas'` na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ( Sample Quality x Good ~ Fair ) Q Poor Pump Liner & Strk Pump Pres: na psi na in. Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gaels 11 \ 22 \ 31 MBT pH Sd Bit No.: 4 Type: PDC E3it Size_ 8 1/2 Jets:. 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 °Jo SLTST 1m % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft _ units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot _ to to -_ to _ to to 24 hr Rec~ Continued E-Lo in on drill i e.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air '',~ Customer: Brooks Ran e Petroleum Re : 30 ort No ~ ~~ ~~~~~'~ g p . We11: Tofkat 1 Date: 13/03/2008 Sperry o.-~n~~~ se.-..:cBS Area: North Slope Depth 13173 ~dlogger's Morning Report Lease: Exploration . Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P- na ftl~r 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 23 unit: 0 unit: ( 209 units @ 3752 ) ( ) Sample Quality x Good ~ .Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi '. ` -` Mudl Wt In 10.70 ppg Visc 270 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mutt Wt Out 10.70 ppg PV 76 cP YP 26 Ibs/100ft2 Gels 15 \ 37 \ 39 MBT pH Sd Bit No:w 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt Orr t3it: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Gonnection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr ~ec< Sta in the hole for dement ~ob... Logging .Engineer: Steven Jenkins / Ed Jones '" 10000 units = 100% Gas In Air Customer: Brooks iRan e Petroleum Re : 31 ort No ~~~?'~"~~~`~ ~~ g p . Well: Tofkat 'I Date: 14/03/2008 s~.-~y Drilling SBrvic®s Area: North Slope Depth 13173 ludlogger's Morning Report . ~ Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH, Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P.. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" 2 unit: 0 unit: ( 8414 units @ 1020® ) ( ) Sam~ale Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres; 1335 psi Mud Wt In 10.80 ppg Visc 221 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg PV 66 cP YP 34 Ibs/100f62 GeRs 14 \ 34 \ 35 MBT pH Sd Bit Nrn.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt 0~°a Bit: 9.00 _ RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip] Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Ma¢~net Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr ~ec~ St a in hole, Circulate bottoms u ,max as 8414 units. Pum 2 cmt lu s, circ btm u ,POOH.. Logg-~g Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort N : 32 ~ ~°~ ~~ g p o. Well: Tofkat 1 Date: 15/03/2008 ~a~"iperry Grilling Services Area: North Slope Depth 13173 udlogger's Me~rning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Rig UP for Cmt Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Ga~s* 2 unit: 0 unit; ( 417 units @ 9920 ) ( ) Sample Quality ~ Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi tl~tlud Wt In 10.8;0 ppg Visc 275 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.8 ppg ItsAud Wt Out 0.0~ ppg PV 66 cP YP 34 Ibsl100ft2 Gels 15 ,\ 36 \ 36 MBT pH Sd Bit Flo.: 4 Type: PDC B~ Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt Dn Bit: 9.00 RPM: 70 Hrs. C~ Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 drip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Itvlagnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection was and Mud Cut ft omits ppg ft units ppg ft units ppg ft wits ppg ft units ppg ft units ppg ft hits ppg ft units ppg ft units ppg ft urnits ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 ~r Rec~ TIH, to cmt. 9950 ft. circulate hole, Max as 417 units.POOH, R/U BHA.w/ cmt stin er & TIH.. Logging Engineer: Seven Jenkins / Ed Jones 10000 units = 100% Gas In Air I~ Customer: Brooks Ran P l t R 33 t N ~~ ~ ~~ ~~ ~` ~~ Well: ge e Tofkat 1 ro eum epor o.: Date: 16/03/2008 ...~,Sperry drilling Ser..ices Area: North Slope Depth 13173 udlogger's Morning Report ,~ Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: Rig UP for Cmt Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Ililax R.®.P. na ft/hr 0 ft/hr ( 0 ft/hr ~ 0 Gas* 45 unit: 0 unit: ( 62 units @ 6540 ( Sa~rnple Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps 57 spm Flow rate 161 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 601 psi ; ~411ud Wt In 10.80 ppg Visc 265 secs API flit ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg ~llud Wt Out 10.90 ppg PV 64 cP YP 32 Ibs/1®Oft2 Gels 16 \ 35 \ 36 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: W1t On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: .0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: short Trip Depth ft Short Trip Gas: ~,Aagnet Recover Lbs to .Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CL ppm to Feet of Fill on Bottom: ft current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg - ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 17r Rec~ Set 3rd cmt lu ,POOH to set 4th lu „ circ btm u ,set plu .POOH. Lagging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i u Gustomer: Brooks Ran e P troleum R rt N : 34 ~~P ~"~ ~"~ g e epo o. Well: Tofkat 1 Date: 17/03/2008 qqqq 1 Sperry Or-~Iling Services Area: North Slope Depth 13173 1 I Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 ~ Curren>I~ 24 hr Avg 24 hr Max R.O.P. nay ft/hr 0 ft/hr C 0 ft/hr @ 0 ) Gas* 2 unit; 0 unit: ( 20 units @ 5055 ) ~ ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 40 spm Flow rate 140 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 588 psi Mud Wt In 'A 0.90 ppg Visc 260 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out X0.90 ppg PV 67 cP YP 26 Ibs/100ft2 Gels 18 \ 35 \ 36 MBT pH Sd - - r ~131t No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 iWt On Bit: 9.0~? RPM: 70 Hrs.. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover I_bs to to Feet of Fill on Bottom: ft Current Litholog~+: 80 % SH 10 % SLTST 10 % SST Connec~;ion Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ~4 hr Rec~ TIH, circ btm u ,cement, ull into cs ,service ri .. 1t_ogging Engineer_ Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 35 Customer: Brooks Ran ort No e Petroleum Re ~ g p . Well: Tofkat 1 Date: 18/03/2008 Sperry ~riuing services Area: North Slope Depth 13173 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas'' na unit: 0 unit: ( 25 units @ 6120 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 49 spm Flow rate 204 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 488 psi Mud Wt In 10.80 ppg Visc 200 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.80 ppg PV 58 cP YP 16 Ibs/100ft2 Gels 13 \ 24 \ 25 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg F GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Service ri , sli & cut drill line, I/d cmt bha, /u olish ass , TIH, wash and ream, circ btm up, POOH.. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 36 ort No Customer: Brooks Ran e Petroleum Re ~`'~ 1 '~ . g p Well: Tofkat 1 Date: 19/03/2008 '.perry Drilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT .Inh Nn_- aK_ann_~F72gg5 Report For• Mr Jack Mudlogger's Morning Report Current 24 hr Avg 24 hr Max R.aJ.P. na ft/hr 0 ft/hr ( 0 ft/hr @ G~~s* na unit: 0 unit: ( 15 units @ ( Sample Quality x Good ~ Fair Poor Daily Cost $3,075 Pump and Flow Data 0 ) Pumps 38 spm Flow rate 188 gpm 6120 ) Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 380 psi ~ulud Wt In 10.10 ppg Visc 154 secs API Tilt m1 HTHP 3.0 ml Mud Wt at Max Gas 10.1 ppg ®Vlud Wt ®ut 10.10 ppg PV 50 cP YP 20 Ibs/100ft2 Gels 11 \ 23 \ 24 MBT pH Sd Bitt No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wft On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 drip Depth: ft Trip Gas: short Trip Depth ft Short Trip Gas: Magnet R~ecovei Lbs to Mud Cut: Mud Cut: to current Lithology: 80 % SH 10 % SLTST 10 C®nnection Gas and Mud Cut ft units ppg f# units ppg ift units ppg ft units ppg ppg Trip CL ppm ppg Short Trip CI: ppm Feet of Fill on Bottom: ft SST ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot _ to _ to _ to _ to to 24 hr Rec~ tCirculate and r/u for cmt. S of isolation lu ooh, s of shoe lu ooh, circ and clean finish POOH... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air I~ Customer: Brooks Range Petroleum Report No.: 37 `~ ~~ ~` ~ Well: Tofkat 1 A Date: 20/03/2008 sperm-y o~~~~~~g, sB~..~oe$ Area: North Slope Depth 3897 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Jack Mudiogger's Morniing Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft,~r 0 ft/hr ~ 0 ft/hr @ 0 ) Pumps 0 spm Flow rate 0 gpm Gas" na ue~it: 0 unit: ( 15 units @ 6120 ) Pump Capacity 4.01 gps ~ ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: o psi Mud VVt In 9.90 ppg Visc 156 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg Mud VVt Out ppg PV 49 cP YP 23 Ibs/100ft2 Gels 11 \ 22 \ 25 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit; RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gam: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Rec~ Test BeDP's, m/u BHA, load nuke sorces, TIH ... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air I~ : 38 Customer: Brooks Ran e Petroleum Report No ~''" ~~~ g . Well: Tofkat 1A Date: 21/03/2008 spe~~-y drilling ser..~o@S Area: North Slope Depth 3897 Mu dlogger's Morning Report ~• Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Cmt Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* na ur~t: 0 unit: ( 15 units @ 6120 ) ~ ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 0 psi Mud V09t 1n 10.00 ppg Visc 152 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg Mud V1/t Out ppg PV 49 cP YP 22 Ibs/100ft2 Gels 10 \ 19 \ 25 MBT_pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On But: RP'fN: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Curren4 Lithology: % SH % SLTST % SST Connection Gas and Mud Cut ~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ,'24 hr Rec< TIH to to cmt, none found, circulate and POOH, la down MWD, m/u bha w/cmt stin er and TIH.. Circ& Clean cement, and pull up hole, circ & clean hole, POOH... 'Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 39 Customer: Brooks Ran ort No e Petroleum Re "~"~~"'~~ ~ g p . Well: Tofkat 1~! Date: 22/03/2008 Sperry ~rillir~g services Area: North Slope Depth 4732 Mudlogger's Moaning Report Lease: Exploration Footage Last 24 hrs: 762 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 105. ft/~er ( 414 ft/hr @ 4245 ) Gas" 4 unit: 75 unit: ( 104 units @ 4550 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 0 psi Mud VVt In 9.90 ppg Visc 179 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud VVt Out 9.90 ppg PV 60 cP YP 27 Ibs/100ft2 Gels 17 \ 38 \ 0 MBT pH Sd Bit No.: 1 T1ppe: PDC Bit Size: 8 1/2 .nets: 6 x 13 x x TFA: 0.778 Wt On Bit: 2.00 f2PM: 70 IHrs. On Bit: 9.10 Total Revs on Bit: Footage for Bit Run 762 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 4732 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CIySt 30 % SLTST 10 % SD Connection Gas and Mud Cut ft units ppg ft tits ppg ft units ppg ft unNts ppg ft twits ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft twits ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ TIH, be in kick off, tirillin ahead... short trip„ Logging Engineer: Steven Jenkins / Ed J®nes 10000 units = 100% Gas In Air : 40 Customer: Brooks Ran e Petroleum Re ort No ~ ®~ ®'~y~ ~,~ p . g Well: Tofkat 1A Date: 23/03/2008 'Sperry Grilling sew~o~~ Area: North Slope Depth 6066 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1334 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885. Report For: Mr JackKeener Daily Cost $3,075 ` Current 24 hr Avg 24 hr Max R.O.P. 125 ft/hr 55.5 ft/hr ( 425 ft/hr @ 5855 ) Gas* 245 unit: 110 unit: ( 834 units @ 5873 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 64/64 spm Flow rate 542 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 2974 psi ° Mud Wt In 10.10 ppg Visc 119 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.10 ppg PV 49 cP YP 23 Ibs/100ft2 Gels 13 \ 26 \ 0 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 2.00 RPM: 70 Hrs. On Bit: 15.50 Total Revs on Bit: Footage for Bit Run 1334 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 4732 ft Short Trip Gas: 429 Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % CIySt 40 % SLTST 20 % SD Connection Gas and Mud Cut 5873 ft 834 units 9.9 ppg ft units ppg ft units ppg 5683 ft 429 units 9.9 ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drillin Ahead, short tri s as needed, um re air, drillin ahead... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 41 ~~ ~®~ ~ ~ r Well: Tofkat 1A Date: 24/03/2008 5per-ry drilling ser..ices Area: North Slope Depth 7778 Lease: Exploration Footage Last 24 hrs: 1712 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 Currernt 24 hr Avg 24 hr Max Pump-and Flow Data 'E~.O.P. S~ ft/hr 71.3 ft/hr ( 339 ft/hr @ 7113 ) Pumps 64/64 spm Flow rate 535 gpm Gas" 47 unit: 68 unit: ( 144 units @ 6599 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good © Fair Poor Pump Pres: 3185 psi Mud Wt In 10.00 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 51 cP YP 27 Ibs/100ft2 Gels 13 \ 25 \ 0 MBT pH Sd t No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ~t On Bit: 2J~00 RPM: 50 Hrs. On Bit: 26.50 Total Revs on Bit: Footage for Bit Run 3046 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Deptth 7778 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to t0 Feet of Fill on Bottom: ft Current Litholo~y: 50 % CIySt 40 % SLTST 10 % SD Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot _ to _ to _ to _ to to 24 hr Rec~ Drillin Ahead, short tri as directed, drillin ahead..... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air drilling Customer: Brooks Range Petroleum Report No.: 42 Well: Tofkat 1A Date: 25/03/2008 Area: North Slope Depth 9582 Lease: Exploration Footage Last 24 hrs: 1804 Rig: Nabors 27 Rig Activity: Drilling Ahead Job No • AK-AM-5672885 Report For• Mr JackKeener Mudlogger's Morning Report •• Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. 279 ft/hr 75.2 ftlhr ( 355 ft/hr @ 8626 ) Pumps 64/64 spm Flow rate 521 gpm Gas" 72 unit: 68 unit: ( 1165 units @ 9358 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Samples Quality x Good ® Fair Poor Pump Pres: 3218 psi Mud 4rNtJn 9.90 ppg Vsc 86 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.0 ppg Mud tdVt Out 10.00 ppg PV 32 cP YP 17 Ibs/100ft2 Gels 11 \ 25 \ 0 MBT pH Sd It No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 It On E-tiL- 10.00 RPM: 50 Hrs. On Bit: 37.10 Total Revs on Bit: Footage for Bit Run 4850 ~ Trip EDepth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gays: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnaet Recover Lbs to to Feet of Fill on Bottom: ft Curre~at Lithology: 50 % CIySt 4D % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units. ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr R~c~ Drilli Ahead, short tri 20 Stnds, drillin ahead..... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i Cust®mer: : 43 e Petroleum Re ort No Brooks Ran ~° , ~'~~ 'tJVell: g Tofkat 1A . p Date: 26/03/2008 merry i7rillirag Servic®s Area: North Slope Depth 11298 t111udlogger's Morning Report o Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1716 Rig Activity: POOH Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 114.4 ft/hr ( 392 ft/hr @ 10436 Gas;" 4 unit; 68 unit: ( 512 units @ 10175 ( Saraiple Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi '"" I~ud Wt In 10.00 ppg Visc 85 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Rid Wt Out 10.00 ppg PV 31 cP YP 22 Ibsl100ft2 Gels 15 \ 28 \ 34 MBT pH Sd bit tNo.: 1 T~rpe: PDC Bit Size: Wt tDn Bit: 10.00 RPM: 50 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Sort Trip Depth 8821 ft Short Trip Gas: Mhagnet Recover Lbs to 11~ud Cut: ppg Trip CI: ppm 123 Mud Cut: na ppg Short Trip CI: 43K ppm to Feet of Fill on Bottom: ft G~rrent Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 ~r Rec~ D3rillin ahead, TD well 11298 ft. Circulate and Clean well, POOH_ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air u Customer: Broof~s Ran : 44 e Petroleum Re ort N ~~~ °~ ~ Well: g Tofkat 1A p o. Date: 27/03/2008 Sperry drilling s~rvicas Area: North Slope Depth 11298 Mudlogger's Morning Report o Lease: Rig: .tob No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: POOH AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.®.P. na ft/hr na ft/hr ( na ft/hr @ Ga$' na unit: na unit; ( na units @ ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; na psi Mr'Jud Wt In 10.00 ppg Visc 90 secs API Tilt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg IUi'lud Wt Out 10.00 ppg PV 33 cP YP 19 Ibs/10(~fft2 Gels 15 \ 27 \ 32 MBT pH Sd Bit ~*lo.: 1 Type: PDC Bit Size: Wt ~On Bit: 10.00 RPM: 50 Hrs_ On Bit: 8 1/2 .Jets: 6 x 13 x x TFA: 0.778 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Sort Trip Depth 8821 ft Short Trip Gas: M~lagnet Recover Lbs to 123 Mud Cut: ppg Trip CI: ppm Mud Cut: na ppg Short Trip CI: 43K ppm to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 Fir Rec~ Fiinish POOH, Test BOP's, TIH ,Slip and Cut.... Logaging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Cust B k R P l ,~"~ ~ omer: roo s ange etro eum Report No.: 45 Well: Tofkat 1A Date: 28/03/2008 Sperry firs^ling Services Mudlogger's iNlorning Report Area: North Slope Depth 11298 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Circ& Cond .lob No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max €~t.O.P. na ft/hr na ft/hr ( na ft/hr @ ) ~Gas* 4 unit: na unit: ( na units @ ) ( ) sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; na psi Mud Wt In 1m.00 ppg Visc 90 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 'tD.00 ppg PV 32 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd tBit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 '~A/t On Bit: 10.0 RPM: b0 Hrs_ On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithologys 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units .ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< TIN, dis lace mud, circulate and condition... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: B k R P t l R rt N 46 ~ roo s ange e ro eum o.: epo Well: Tofkat 1A Date: 29/03/2008 Sperry Grilling Services Area: North Slope Depth 11298 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Set Cmt.. Job No.: AK AM-5672885 Report For: Larry-Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr IIAax f~.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Gas" 4 unit: na unit; ( na units ~ ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 80 secs API felt m1 HTHP ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 16 cP YP 38 Ibs/100ft2 Gels 26 \ 28 \ 33 MBT pH Sd 63t No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 U~'t On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 2~4 hr Rec~ TIH with 2 7/8 in tubin ,circulate and ri u and set cement lu ,POOH and I/d tubin and wait on cmt.. Lugging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 47 Customer: Brooks Ran e Petroheum Re ort No ~~~ `~ . g p Well: Tofkat 1 B Date: 30/03/2008 Sperry Grilling Services Area: North Slope Depth 4200 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH .Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Gas" 4 unit: na unit: ( 10 units @ ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 18o secs API felt ml HTHP ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 58 cP YP 29 Ibs/100ft2 Gels 16 \ 38 \ 42 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: .0.778 Wt On Bit: 10.00 RPM: Hrs. On Bit: Total Revs on Sit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft .units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Finish cmt, Test BOP's, M/U new BHA, load nukes, TIH, Shallow Test, contd TIH , Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran ort No : 48 e Petroleum Re e ~ ~ g p . Well: Tofkat 1B Date: 31/03/2008 Sperry drilling Ser.rices Area: North Slope Depth 5502 Mudlogger's Morning Report !.ease: Exploration Footage Last 24 hrs: 1302 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 108.5 ft/hr ( 515 ft/hr @ 451"0 ) Gas* 11 unit: 95 unit: ( 123 units @ 540>:~i ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 62/67 spm Flow rate 546 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 2920 psi °< . Mud Wt In 10.00 ppg Visc 125 secs API lilt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT pH Sd Bit No.: 1 Type: PDC Brit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 5.60 Total Revs on Bit: Footage for Bit Run 1302 Trip Depth: ft Trip Gas: -Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: 'Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 1(D % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drill Cement, kick off , driliin ahead, short tri 5502 ft ` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 49 Customer: Brooks Ran ort No e Petroleum Re ~~~ _~ ~`~ ~ ~~ g p . Well: Tofkat 1 B Date: 01 /04/2008 Sperry flrilling Services Area: North Slope Depth 7975 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 2473 Rig: Nabors 27 Rig Activity: Short Trip Job. No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.®.P. 211 ft/hr 103 ft/hr ( 809 ft/hr @ 7814 ) Ga-s'` 121 unit: 88 unit: ( 250 units @ 7855 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/67 spm Flow rate 525 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 3377 psi RNlud Wt In 10.00 ppg Visc 125 secs API felt mt HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg It+llud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT pH Sd Bit tVo.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 W~ On Bit: 12-15K RPM: 60 Hrs. On Bit: 16.70 Total Revs on Bit: Footage for Bit Run 3775 'rip Deptba: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7975 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current LiRhology: 40 % CIySt 50 % SLTST 10 % SST C®nnection Gas and Mud Cut tt units ppg ft units ppg ft units ppg ~it units ppg ft units ppg ft units ppg ~ units ppg ft units ppg ft units ppg ~ units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to #o to to to 24 hr Rec~ drillin alhead, short tri 7975 ft Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran : 50 e Petroleum Re ort No ~'~ ~'~ g p . Well: Tofkat 1 B Date: 02/04/2008 Sperry drilling Services Area: North Slope Depth 9492 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1517 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 185 ft/hr 182.8 ft/hr ( 207 ft/hr @ 8722 ) Gas" 130 unit: 111 unit; ( 435 units @ 8900 ) ) Sample Quality x Good ~ Fair ~r Pump and Flow Data Pumps 61/68 spm Flow rate 547 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi Mud Wt In .10.00 ppg Visc 120 secs API felt ml HTHP 3.2 ml Mud Wt at Max Gas 10.0 ppg Mud VVt Out 10.00 ppg PV 47 cP YP 25 Ibs/100ft2 Gels 20 \ 34 \ 41 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 12-15K RP'M: 60 Hrs_ On Bit: 25.00 Total Revs on Bit: Footage for Bit Run 5292 Trip Depth: ft Trip Gas: Mud Cut: ppg TripCl: ppm Short Trip Depth 7975 ft Short Trap Gas: 223 Mud Cut: na ppg Short Trip CI: 43k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current t_ithology: 50 % CIySt 40 % SLTST '10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS ,Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< TIH f/short tri , STG 223, Drillin AheacE, Short Tri 9492'. Logging Engineer: Steven Jenkins / Ed Jone: 10000 units = 100% Gas In Air Customer: Brooks Ran : 51 e Petroleum Re ort No ~ g p . Well: Tofkat 1 B Date: 03/04/2008 Sperry ~rilli~g ser..icBS Area: North Slope Depth 10785 udlaogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1293 Rig: Nabors 27 Rig Activity: CO Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 (Current 24 hr Avg 24 hr Max R.O.P. 185 ft/hr 161.6 ft/hr ( 470 ft/hr @ 9673 ) ~. C~as* 4 unit= 94 unit: ( 250 units @ 9915 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 61!68 spm Flow rate 547 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi Mud V1lQ to 10.00 ppg Visc 127 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud VVt Out 10.00 ppg PV 52 cP YP 26 Ibs/100ft2 Gels 18 \ 37 \ ## MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 \yNt On Bit 12-15K RPM: 60 Hrs. On Bit: 33.00 Total Revs on Bit: Footage for Bit Run 5292 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Tirip Depth 9492 ft Short Trip Gas: 141 Mud Cut: na ppg Short Trip CI: 43k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % SST 40 % SLTST 20 % SD tConnection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec; Drillin .ahead, losin mud, well flowin ,increase MW, decrease MW, CO, Pum LCM around.. Logging f`ngineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 1 Custom r B k R P l t R ~ II~Li : e roo s ange ro e eum eport No.: 52 Well: Tofkat 1 B Date: 04/04/2008 Sperry ~rillir~g SBI"VICBS Area: North Slope Depth 12442 Mudlogger's Morning Report Lease: Exploratioa~ Footage Last 24 hrs: 1707 Riig: Nabors 2~ Rig Activity: drilling ahead Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P.. 113 ft/hr 71 ft/tw ( 226 ft/hr @ 12216 ) Gas* 58 snit; 62 unit; ( 113 units @ 11962 ) ( ) Samp~: Quality x . Good ~ Fir Poor Pump and Flow Data Pumps 57/65 spm Flow rate 522 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 3786 psi Mud Wt In 9.80 ppg Visc 12QD secs API Tilt ml HTHP 3.3 ml Mud Wt at Max Gas 9.9 ppg Mud `Wt Out 9.90 ppg PV 39 cP YP 26 Ibs/100ft2 Gels 20 \ 31 \ 37 MBT pH Sd ' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 FtPM: 90 Hrs. On Bit: 43.10 Total Revs on Bit: Footage for Bit Run 6999 Trip ®epth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: ti0 % SH 30 % SLTST 10 % SD Connection Gias and Mud Cut ft units ppg ft units ppg ft units ppg ft unfits ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drillin Ahead.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 53 Customer: Brooks Range Petroleum Report No ~~ .Lf . Well: Tofkat 1 B Date: 05/04/2008 Sperry drilling Services Area: North Slope Depth 13770 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1328 Rig: Nabors 27 Rig Activity: drilling. ahead Job No.: AK-AIVI-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 113 ft/hr 126.5 ft/hr ( 338 ft/hr @ 13296 ) Gas* 42 unit: 58 unit: ( 440 units @ 13200 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 53/62 spm Flow rate 493 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3759 psi Mud Wt In 9.80 ppg Visc X30 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.10 ppg PV 49 cP YP 27 Ibs/10Q~t2 Gels 20 \ 33 \ 40 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 8327 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft 40 % SLTST 30 % SST Current Lithology: 30 % SH u Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAF(S Depth Gas in units Chromatograph in ppm Max ~ Background C1 C2 C3 C4 Tot C5 Tot 13330 to 13580 153 _ 44 11 1 1 1 to to to to 24 hr Rec~ Drilling Ahead.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 1D0% Gas In Air 1 : 54 Customer: Broof~s Ran e Petroleum Re ort No ~~~~ g p . Well: Tofkar# 1 B Date: 06/04/2008 Sp®rry Grilling Services Area: North Slope Depth 15099 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1329 Rig: Nabaxs 27 Rig Activity: drilling ahead Job No.: AK-A~l1-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Mlax R.O.P. 133 ft/hr 126.5 ft/hr ( 226 ft/hr ~ 14441 ) Gas* 4 unit: 47 unit: ( 178 units @ 14478 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 52/65 spm Flow rate 491 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3840 psi Mud Wt In 9.90 ppg Visc 110 secs API Tilt ml HTHP 3.0 ml Mud: Wt at Max Gas 9.9 ppg Mud Wt Out 'p0.00 ppg PV 45 cP YP 24 Ibs/101i)ft2 Gels 17 \ 32 \ 40 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.OO RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 9656 Trip Depth: ft Trip Gas: Mud Cut: ppg ~ 'Trip CI: ppm Short Trip Depth 13200 ft Short Trip Gas: 44Q1 Mud Cut: na ppg Short Trip CI: 40k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithologyr: 30 % SH 40 % SLTST 30 % SST Connection Gas and Mud Cart ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS - Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drillin Ahead.. _ . Logging Engineer-_ Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air I I t Customer: ort No Brooks Ran e Petroleum Re : 55 g p . ~ ~ ~ Well: Toftcat 1 B Date: 07/04/2008 Sperry Orilaing s®.-..~~es Area: North Slope Depth 15575 Lease: Exploration Footage Last 24 hrs: 476 Rig: Nabors 27 Rig Activity: POOH Job No.: AK AM-5672885 Report For: Mr Larry Meyers Mudlogger's ~Ilorning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 33 ft/hr ( 236 ft/hr ~a 15039 ) Pumps na spm Flow rate na gpm Gas* na unit: 0 unit: ( 46 units ~ 14815 ) Pump Capacity na gps Sample Quality x Good ~ ( Fair Poor ) Pump Liner & Strk na in. Pump Pres; na psi Mud Wt In 990 ppg Visc 110 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 44 cP YP 20 Ibsf100ft2 Gels 17 \ 35 \ 42 MBT pH Sd Bit No.: 1 Type: PDC Bit Site: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 67.00 Total Revs on Bit: Footage for Bit Run 10134 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Rltagnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology. 80 % SH 20 % SLTST % SST Connecti®n Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth to _ to _ to _ to to GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 24 hr Rec~ Drillin ahead, reach TD, CO, POOH Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air t Totkat 1 Brooks Range Petroleum Nabors 27 E LOCATION: Coleville River AREA: Exploration,Nuisgsut STATE: Alaska BHA # Bit # Bit Type Bit Size Depth IN Depth OUT Footage Bft Hours TFA AVG ROP WOB RPM PUMP Press PUMP GPM Bit Grade Remarks 1 1 Mill Tooth Bit 12.25 113 2166 2053 22.3 0.942 92.1 15 40 2300 630 3 6 WT A E 1 BU BHA 2 2 Mill Tooth Bit 12.25 2166 3911 1745 21.9 0.942 79.7 22 50 3800 728 11 WT A E I BU TD Run 9 5/8' casing 3 3 HTC GT1 8.50 3911 3911 0 OPEN Used Bit 4 4 PDC BIT 8.50 3911 10092 6182 38.9 0.778 159.1 9 46 3800 654 0-1-WT-S-X•I-NO-PP 5 4RRI PDC BIT 8.50 10092 13174 3082 26.3 0.778 1172 9 80 3850 560 1-1-WT-A-X-I-CT-TD ~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ H~i.i.181~ TC1(N Casing Record Sperry Drilling Servit~ Water Base and Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 12 Feb 2008 TD Date: 18 March 2008 Exploration, Nuisqsut Date Depth ft - MD Wt Vls sec PV YP Ib/100 Gels iwioos' Fitt m/30m /tom 3 Cake 32nds Solids % Water % Stl % CI M L Satt % Wt Lime Ib/bbl pH Oil O/W ratio ~,- Remarks 12-Feb 850 9.60 283 40 45 20/55/0 ~zs/ssm/s3/za~z7 S d Well 13-Feb 2068 9.40 152 21 40 20/65/0 7.0 avsvsa3srz3/as 3 9.6 90.4 4.50 2500 8.8 14-Feb 2472 9.60 174 20 38 19/60/0 7.0 7v5e/3vzanino 2 9.4 90.6 2.50 1700 8.5 15-Feb 3800 9.60 165 17 37 28/70/0 7.0 ~vsa/as/3s/zvz~ 2 9.5 90.2 1.25 1450 9.5 POH for casin 16-Feb 3911 9.70 88 27 23 13/55/73 7.6 nisaaazsnas 2 9.9 90.1 1.25 1400 8.5 17-Feb 3897 9.70 55 19 7 1/2/0 5.0 a5/2snsnvvi 1 9.9 90.1 0.25 1250 9.0 Cementcasin 18-Feb 3897 9.70 55 19 7 1/2/0 5.0 45/261x11/2/1 1 9.9 90.1 0.25 1250 9.0 19-Feb 3911 9.70 55 19 7 1/2/2 5.0 a5/2s/~snvvi 1 9.9 90.1 0.25 1250 9.0 20-Feb 3911 10.10 190 39 18 11/22/24 2.0 ss/s~iav2xi~no 1 5.6 30 61k 24.1 1.2 62.0 67/33 Chan etoOilMud 21-Feb 6000 10.00 118 46 23 16.5/28/28 2.0 i~5/sxs3/37nan3 1 7.0 30.5 63k 24.4 1.7 60.0 66/34 22-Feb 7590 10.00 90 35 23 13/22/22 2.0 s3/sa~aa/3iHVi~ 1 9.7 31 60k 23.3 1.3 57.0 65/35 23-Feb 8844 10.00 114 31 21 14/20/0 2.0 83/52/3x27/12/71 1 9.5 33 1.10 59k 23.1 1.0 67.0 67/33 Drillin 24-Feb 9034 10.00 119 27 16 12/20/0 2.0 7a43/3v23/8n.5 1 9.8 31 0.50 56k 24.5 1.0 61.0 69/31 Drillin ri in 25-Feb 10091 10.00 86 27 16 12/18/0 2.0 7aa3/3znz/s/a 1 10.0 31 0.50 52k 23.2 1.6 61.0 69/31 Tri in for 5' i 26-Feb 10091 10.00 91 27 16 13/19/0 2.0 7v4a/3v2z/xs 1 10.0 31 0.50 53k 23.5 1.6 61.0 69/31 Tri in oul BOP test 27-Feb 10091 10.50 76 20 17 6/16/20 2.0 s7/3~/z6rns/a 1 10.0 31 0.35 SOk 21.6 1.0 60.0 68/32 RIH w8h 5 DPH 28-Feb 10603 10.35 80 27 18 3/4/9 2.0 ~vas/2sn~i3/2 1 10.0 32 50k 22.5 1.0 62.0 70/30 Drillin Ahead 29-Feb 11871 10.50 130 54 19 11/23/31 2.0 i2~n3/5x3zms 1 10.0 32 4370 20.8 1.0 60.0 70/30 Drillin ahead Ot-Mar 12790 10.60 147 56 26 19/34/42 2.0 13x82/61/42/11/10 1 10.0 32 48k 23.8 0.5 60.0 71/29 Drillin Pum in Swab 02-Mar 13173 10.60 123 56 23 11/24/33 2.0 i35nxsv33 1 10.0 32 50k 24.2 0.7 58.0 70/30 Drilled TD POOH 03-Mar 13173 10.70 124 56 23 11/23/33 2.0 135/Bx81/33/ta8 1 10.0 32 50k 24.1 0.7 58.0 70/30 POOH L/D BHA 04-Mar 13173 10.70 124 56 23 11/24/33 2.0 135!/x61/33/ta8 1 10.0 32 50k 24.2 0.7 58.0 70/30 10 in well 05-Mar 13173 10.70 130 60 22 11/25/37 2.0 13x82/63/35/11/10 1 10.0 31 50k 25.3 0.7 60.0 72/28 1 in well 06-Mar 13173 10.70 156 61 21 11/25/38 2.0 i3xez/s3/35nvio 1 10.0 31 SOk 25.4 0.5 60.0 72/28 1 in well 07-Mar 13173 10.70 180 62 20 10/25/35 2.0 ~4arevsx35/x> 1 10.0 31 SOk 25.6 0.5 60.0 72.28 1 in well2nd rt 08-Mar 13173 10.80 155 53 27 10/23/30 2.0 i33/aa5/3vxs 1 10.0 30 47k 22.1 0.5 60.0 70/30 in well 2 09-Mar 13173 10.70 146 57 22 11/22/30 2.0 136nx54P31/x8 1 10.0 31 47.5k 22.2 0.7 60.0 70/30 MDT I in 10-Mar 13173 10.70 147 58 21 11/22/31 2.0 ~37nxs3/3vx6 1 10.0 26 48k 22.4 0.7 60.0 70/30 MDT in 11-Mar 13173 10.70 149 58 21 11/22/31 2.0 137n9/53/31/ta8 1 10.0 26 46k 21.7 0.7 60.0 70/30 POOH 12-Mar 13174 10.70 120 76 26 15/37/39 1.0 na'~o2n5/a5nin 1 10.0 26 48k 23.1 0.6 59.5 70/30 L in well 13-Mar 13174 10.80 120 66 34 14/34/35 1.0 iss~~oonz/aanv~ 1 13.1 26 48k 23.1 0.5 60.0 71/29 L in well 14-Mar 13174 10.80 120 66 34 15/36/36 1.0 ~ssnoona/asnvi 1 13.2 25 475k 22.9 0.4 60.0 71/29 in well 2nd rt 15-Mar 13174 10.90 120 64 32 16/35/36 1.0 16a98~71/aviino 1 14.5 24.5 47k 23.1 0.4 61.0 71/29 Clean hole, RIH S tted 16-Mar 13174 10.90 120 67 26 18/35/36 1.0 isas3/sxaa~ino 1 13.2 23.35 47k 23.5 0.6 67.0 72/28 Wash down lookin for lu 17-Mar 13174 10.70 120 58 16 13/24/25 1.0 132n4/53/2xx8 1 13.7 24 47k 23.5 0.7 60.7 72/28 sli and cul TD this section 18-Mar 13174 10.10 120 50 20 11/23/24 1.0 i2onasazsn/s 1 13.0 25 47k 22.7 0.7 62.0 71/29 of hole New Well Tofkat 1A New folder. Tofkat 1 A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 u:.a:.ui:..6::.: ..... n.. ~ .......n ...... ..... ...............:.: Sperry DRILLING SERVICES Show Re ort p q: : ':i::::.,: p i. . ..•.. i' .i. i'1 .. : a........... ~...e............ : :.u.. ~..i:...... ;; ..w:::x'1 i€ ......:..........:: 1 ...:.... I..nL:€..:. i.:n:l!1:'e'uu:::l'ilu: ;:€.::€ : ..¢x:::::'.. ~...a. :: : .u:......p.: n.. ....:.a ~. !... :..5'..a':.M. 1 .: i:. 11: i.: ~ i .:... «, i.i.'.y..uu.ui.u•u.. €! .....:.:...... ...... .i .. ii: ugi:[I:u:::..:...u: is !:.y:y e"' iE~ ii{ '. ~.~... In!!i I.I.k:B:... ~:: i.u 3:1. .:...0. a n..~.. .! €. ~ :i........ .... : ~€ ..i.u.:e.n.... 1:!:.or;o;:€f, ' f!€ E€Ei Well Name: Tofkat 1 Depth (MD) 5800 to 6500 ft ii Location: NORTH SLOPE, ALASKA (TVD) 3989 to 4342 ft Operator: BROOKS RANGE PETROLEUM Show Report No. 1 i €,€ i im 21-Feb-08 Date/T e P r d B Steve Jenkins/ Ed Jones Re ort re a e P P Y r T DOUG HASTINGS Re ort Delive ed o P Inter retation: To set 3 Cla sone: lite brown- ra soft firm, sli htl calcareous. Siltstone: It- med brown ,soft firm, block an ular, sli htl '! p P Y 9 Y, 9 Y Y: 9 9 Y calcareous. Sand: Fine med, Angular, light gray, sub- rounded, pyritic. a !i; ':::BI:1:]e:e:ze:e:]i:i:i :i:?I:DI:I:zl:i:3i"! ~''::5:.'e'I:sl:l::l:zl:la:::ale~' , : u:y :y •:.: .!'e:e:51:1:BI:1:]1:iS:i : ;::a:!: :1:1::::1: ::.:::.a:::9e":Ji:1:Bi:1:di:i:]isii sa : : :z1: :1::...:,1::.,.;.:1:;:.1::: I:la,::~ 1:1:-:~ 1::::::1.:1::1:1..:::::,>,~ ::::.. ~ Depth 5850 ft Gas ---------------------------9 --- Flowline Back rou . ... ; a. , :.: :...,..: .. .r: : a a : : a .~::: ~~:::1:1:,1:1:;1:1:„1:1:„: a~. % x Units 974 Mud Chlorides (1000's) 63 k ------------------------------------------------------ nd Show ; . .a: ::: . Hydrocarbon Ratios !! C1 C1 C1 C1 ,; - - - - C2 C3 C4 C5 < ppm ppm ppm Hydrocarbon Ratios 1000 0 . C1 41295 - 41295 = 41295 C1/C2 = 15.8 C2 2615 - 2614 = 2614 C1/C3 = 30.7 5 C3 1489 - 1489 = 1345 C1/C4 = 199 . C4 207 - 207 = 207 C1/C5 = #DIV/0! NPH C5 0 - 0 = 0 Production 100.0 -= - ~~~' Analysis x Gas Oil Water Non-Producible Hydrocarbons 2 ' Depth 5950 ft Gas --------------------------- --- s) 63k x Units 1091 Mud Chlorides (1000 ------------------------------------------------------ Gas 9 Flowline Back round Show PPm PPm PPm Hydrocarbon Ratios 0.0 __-- ----------- _ _ ----- ---- - _ _ ------ ---- »,. ::; C1 60383 - = 60383 C1/C2 = 12.4 C2 4888 - = 4888 C1/C3 = 19.3 NG Oil "€ C3 3128 - = 3128 C1/C4 = 132.1 rc C4 457 - 0 = 457 C1/C5 = #DIV/0! C5 0 - 0 = 0 NPH a ° -------------------------------------------------------------------------------------- Production Analysis x Gas Oil Water Non-Producible Hydrocarbons 1.0 li; g Depth 6250 ft Gas ---------------------------9 -- Flowline Back rou % x Units 760 Mud Chlorides (1000's) 63k ------------------------------------------------------- nd Show C - C Hydrocarbon Ratio 1 C1 - 2 C3 s C1 C - - C4 C 1 a: r 5 ppm ppm ppm Hydrocarbon Ratios 1000 0 i . !` C1 42939 - = 42939 C1/C2 = 11.8 i i 17 3642 .4 C1/C3 = C2 3642 - = C3 2469 - = 2469 C1/C4 = 126.3 C4 340 - 0 = 340 C1/C5 = #DIV/0! NPH i C5 0 - 0 = 0 Production 100.0 _ -~ ~-~- - - - s `~ ' l H d b rocar ons e y Analysis x Gas Oil Water Non-Producib 4 63k ' Gas Depth 6500 ft Gas x Units 875 Mud Chlorides (1000 s) - - Flowline Background Show ppm ppm ppm Hydrocarbon Ratios 10.0 - -------- - --- --------- --- ----------- :: C1 24745 - = 24745 C1/C2 = 9.a Oil C2 2645 - = 2645 C1/C3 = 12.1 C3 2052 - = 2052 C1/C4 = 75.2 C4 329 - 0 = 329 C1/C5 = #DIV/0! C5 0 - 0 = 0 NPH ------------------------------- ---------------------------y ----------------- Production n-Pr ducible H drocarbons r No 0 i x it Wate Analvs s Gas O :.:................:.......................................:........... : .... ....~ :......:................... :................... :: i : .... ..... ... ... .. :................: i .....:.............. 1 i :..:.::. ...rrruruuuu»a:.a....i:..rruuuuruaaaaaaaaa.....:.... ..:..i.r..rri.ryuar..J.a. ~.... ~:..... :.: . _.:..... ..............:....1.:................:.: 11:1:1..1.:...:.........:.... .:::..................... . :...> .::: ....::zr::z:r:::s::s::a.::. ~:..uussaa.uararau.a:.a.ai::.::::i: ur€rurrur; rr;. aaar::::!:!:. i.i ................ ,i.[€!~ . 1.0 ..... vEL ........... :: €.:. Ep .:.:Su: u.:..u i' .............:! ... ............. L:..... 1,;:::.:::::~:::a.::::::::::......... ..... ..:.Ui... i.... ~...... :.:.... :ka.. ~...:...I.... r.:::.i:s .~ t: . 1: . E4 ........s :. i..... :..: ..t.... ......'~. «.[ : .... ..... c.. .. ... . i..uuuo.a:; €... :...rr !s:::z:a:z:lllr°:: :I€U::: . ..:..........::ml:l:zl::z::: .. x :. :,: " .::a::l::i. rr..: . .: :u:z 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i.:~ !::f::e ii.lll : f:i7~uiy9 i 'E ul' i. Sperry DRILLING SERVICES Show Re Ort p .: ' :.,. , p :1:9-.. . r9i::H 1e21'ez:::e'..; .:...:,:li 111:1.1: i. i 1111:1111,11:,. 7111........ . 'li ' i E lilllil!111199991:::;. 1:: .ugiu::••••..:el f91179Y Ea,9 . 1...:99R'ilelzliii3iiiiiS:: ~i ~e:: +~i?tlku ! i i i. '!uiYEE'9,1u.. . i'i'i:. ~..:.. ::.I ~I ...i..u...n i. ii ., i.;;u: i :E ! ,i,:liiiil]ei:.p::::::i::::::,:a::z:u,ee .. i. 1:9!:li:ui;. is i .i...I:iu,i......r, :..i... .l...u. i....E..I.......u.................. ..I u, ~. Well Name: Tofkat 1 Depth (MD) 8650 to 8850 ft '` Location: NORTH SLOPE, ALASKA (TVD) 5425 to 5525 ft 11 Operator: BROOKS RANGE PETROLEUM Show Repoli No. 2 "~l Re ort Pre ared B : Steve Jenkins/ Ed Jones Date/Time: 23-Feb-08 i11 P P Y ,a nb Re ort Delivered To: DOUG HASTINGS p , . ,: ,:el..? 1:?1:!:1:9:.,:1^:IAi^: InterpretatlOn: Claysone: Light Brown Gray, Firm, blocky, slitly calcareous, Sandstone: Off white, cream, very fine grain, sub- anglar, mod- cei Siltstone: Coarse crystalline, light gray, very coarse grained, calcite, sub- rounded, poorly sorted, soft, poorly cemented, blocky no apparent bedding. n e9 ~ : a1: . : : : e'r : Y: ' 91: :91: :99999997%: 9:: : i : :3 : i 9 P : ' ' ^ 9 999!: i E : : ' • ' ' ^ : ` : n;.;2 ..:u:cuu >:; n: ; eu:c:; a::> : : :r: Praz: s:..i. J ..:.: s .: e ::9 .ea :97:9 :....... .. .: .. : : .... .. .9::..: w ::l.:l:::i.:n:.::.nr:,z^., 9vi uF! 1.9 i 199 99 9! 999i:A991 ~ °i° Depth 8650 ft Gas x Units 75 Mud Chlorides (1000'8) 64k ---------------------------9 --------------------------------------------------------- Flowline Back round Show . : ~ ; , . . n a 8 : aa:s > .. . ;~ 99951Y 9 •F: i Hydrocarbon Ratios C1 C1 C1 C1 - - - - C2 C3 C4 C5 :::: PPm PPm PPm Hydrocarbon Ratios 1000 0 . C1 7324 - = 7324 C1/C2 = 33.3 220 220 C2 - = Ci/C3 = 120.1 C3 61 - = 61 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! NPH C5 0 - 0 = 0 -------------------------------------------------------------------------------------- Production 100.0 ---------- -- --- -~'-~--- ~~~' --- --- Analysis x Gas Oil Water Non-Producible Hydrocarbons ii 2 D th 8750 ft G 74 M d Chl id 1000' 64k U it ep as ---------------------------9 --- Fl li B k or x n s u es ( 8) ------------------------------------------------------ d Sh Gas ow ne ac roun ow PPm PPm PPm Hydrocarbon Ratios 10.0 ______ ----------------- _ ___ -- ------ - _ _ . ---------------- C1 7641 - = 7641 C1/C2 = 32.7 C2 234 - = 234 C1/C3 = 186.4 41 41 Oil C1/C4 = #DIV/0! C3 - = C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 --------- - -------------------------------------------------------------------------- NPH 1 0 iii - Production Analysis x Gas Oil Water Non-Producible Hydrocarbons . ilii 3 °io Depth 8850 ft Gas Units 80 Mud Chlorides (1000's) 64k ---------------------------9 --------------------------------------------------------- Flowline Back round Show C _ C Hydrocarbon Ratio 1 C1 - 2 C3 s Ci C - - C4 C 1 1: :::: 5 ppm ppm ppm Hydrocarbon Ratios 1000 0 . C1 5667 - = 5667 C1/C2 = 28.6 C2 198 = 198 C1/C3 = 83 3 ~' - . C3 68 - = 68 C1/C4 = #DIV/0! NPH '' C4 - 0 = 0 C1/C5 = #DIV/0! ' I Production 100.0 '^ sis x Gas Oil Water Non-Producible H drocarbons Anal y y l 4 % D th ft G M d Chl id 1000' U it Gas ' ep as Fl li B k or x n s u es ( 8) d Sh __-~ !': 1: ow ne ac groun ow ppm ppm ppm Hydrocarbon Ratios 0.0 ~~__~_ _ ------- :,. C1 - = 0 C1/C2 = #DIV/0! Oil ' C2 - = 0 C1/C3 = #DIV/0! : #DIV/0! 1/ 0 C4 = C3 - = C ' C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ---- ---------------------------------------- NPH 1 0 j~' :,.: Production Analysis x Gas Oil Water Non-Producible Hydrocarbons . ~i 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 G!J': ': i 1.. E6:iii:r;: ' ...i. ..:i.::i E i ~' iii :::: :.:. !: .i:: : ,..:.f..:.: e. ... Sperry DRILLING SERVICES SNOW Report ., .i::t:i.: rii rii.i.ie en • .. ~ E <. is is i.'! is i:: s::: z r.:::::;;..:.: :::;,r: ~ I: z:: z.: s:: z:: z..:.. . . 1.:::3.E3:E.E E'rs:E E E:E:EEEZE NEE,:a:7W.pi eiue;:a'reei]iiai e:i:::z::zp::~.,,:: I:e:: .: :ri:i:g~~: .:i:N. ' !i:#i!i:a!::, :::; ;: ::.!i:::: I .:i ilia: ~ :.:1::::::::1........:::::sa::isi:,:::s:::!::..ruu..:::r,::!::::..;.:...:.::.::::.:.::::a!:i::z:`~ I "..:I i i ,..~ :'' ,:.I.. ..::s::»»::zii::..... .~• .................. E : 'geiai:;zezee'~i:. <e ,;e'], : .i.. ::......un.....n..,..., . ...............:::z::ue':...Z. :::no,::y ..............~..... .. i ., . . .. ................:......................ru: uuuaau......... :. :i ..i i.......,,.r.,e::::z::ae":.. n.,i::.::.a:uz .. 1!Rd:yr...; .na#,:::r:::^;a:z•e;.,,.., Well Name: Tofkat 1 Depth (MD) 12750 to 12900 ft Location: NORTH SLOPE, ALASKA (TVD) 7487 to 7565 ft Operator: BROOKS RANGE PETROLEUM Show Report No. 3 Report Prepared By: Steve Jenkins/ Ed Jones Date/Time: March the 3rd Report Delivered To: DOUG HASTINGS ~" Interpretation: Limstone:Buff, Cream, Dolomitic, Moderately hard, Sucrosic, blocky, Glauconite Siltstone: Coarse crystalline, Grey, very coar<. grained, sub-rounded, poorly sorted, moderately hard, Blocky, no apparent bedding, Sand: Fine Crystalline, light gray to gray, to fine grain, dolomite, si angular, moderately hard, with glauconite, pyritic, Porosity good. Fluorescence: Moderate, dull yellow with weal oil stain. ~ Depth 12795 ft Gas --------9 --- Flowline Back rou °i° x Units 30 Mud Chlorides (1000's) 52k ------------------------------------------------------ nd Show Hydrocarbon Ratios C1 C1 C1 C1 - - - - C2 C3 C4 C5 ppm PPm ppm Hydrocarbon Ratios 1000.0 C1 698 - = 698 C1/C2 = 10.0 ii :a C2 70 - = 70 C1/C3 = 13.2 C3 53 - = 53 C1/C4 = #DIV/0! ~` C4 - 0 = 0 C1/C5 = #DIV/0! NPH C5 0 - 0 = 0 Production 100.0 ----- -~ ~ - ~~- A l i Oil W N P d ibl H d b G t na ys s x er on- ro uc e y rocar ons as a 2 % ~ii D h 28 i M d Chl id 1000' t "' 1 50 ft Gas ept --------------------------- ---- Fl li B k x Un ts 45 u or es ( s) ------------------------------------------------------ Sh :,: :,: ow ne ac ground ow PPm PPm PPm Hydrocarbon Ratios 0.0 _--- ---- _ - - - ------------- _ ~ _ -------- --- ;;is C1 678 - = 678 C1/C2 = 8.9 rt C2 76 - = 76 C1/C3 = 10.4 i Oil C3 65 - = 65 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ------------ NPH 1 0 ~„ I;i ri -------------------------------------------------------------------------- Production Analysis x Gas Oil Water Non-Producible Hydrocarbons . '~ ;~ 3 °i° Depth 12900 ft Gas x Units 78 Mud Chlorides (1000's) ---------------------------9 --------------------------------------------------------- Flowline Back round Show C - C Hydroca 1 C - 2 C rbon Ratio 1 3 s C1 C - - C4 C ~'` 1 5 PPm ppm ppm Hydrocarbon Ratios 1000 0 ~ . C1 5115 - = 5115 C1/C2 = 11.2 ~ 4 C2 456 = 456 C1/C3 = 16 ii . - E ! C3 311 - = 311 C1/C4 = 83.9 i, C4 61 - 0 = 61 C1/C5 = #DIV/0! NPH Production 100.0 ---y ~ ~-~-- ------------ ~„s n-Pr ibl H drocarbons A l i G Oil W t N d y na ys s x as a er o o uc e 4 % {,i D th ft G it M d Chl id 1000' U Gas '~ ep as ---------------------------g -- Fl li B k n u or es ( s) s ------------------------ ----------------- d Sh - - ~ ' i y ow ne ac roun ow PPm PPm Ppm H drocarbon Ratios 0.0 ____ ----- _ _ . --- -------- is C1 - = 0 C1/C2 = #DIV/0! Oil C2 - = 0 C1/C3 = #DIV/0! C3 - = 0 C1/C4 = #DIV/0! "s l C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ------------------- NPH 1 0 ~, ------------------------------- --------------------------- Production Analysis x Gas Oil Water Non-Producible Hydrocarbons . r . ~!:::::r:... :::::....; !::: ;:,rr iii3iii~ `iii"€~' ii{ii'i!iii ::: ... ;~ Sperry Drilling Service Brooks Range Petro Tofkat # 1 Tops MD TVD SSTVD Gubik Base 575 522 -489 Permafrost Base 1288 1272 -1239 W Sak Base 2064 1911 -1878 Shall Wall (K-5) 3084 2620 -2587 Shoe 3857 Surface Casing 3911 3032 -2999 Qannik 2 6119 4150 -4097 Qannik 1 6288 4236 -4183 Qannik Base 6401 4293 -4118 C4U 6447 4316 -4274 Top Turbidites 9632 5921 -5868 Top Turbidites 2 10496 6352 -6299 Top Turbidites 2 base 10722 6465 -6412 Top Turbidites 1 1os88 ssoo -6547 Top Turbidites 1 base 11190 6700 -6647 H RZ 11350 6781 -6728 Ka l u bi k 11 ss8 6955 -6902 K-1 11767 6995 -6942 Kupark C 11932 7027 -6974 LCV 11950 7089 -7036 BKIJ 12621 7440 -7387 Alpine C 12799 7523 -7470 a~-4 12790 7540 -7487 TD 13174 7731 -7678 PAD Elev. 19.8 Drill Floor 32.9 K.B. 52.7 Qannik Top Albian Turbidites Kuparuk C Brooks Range Petroleum TOFKATI AP i-050-103-20567-00 2" M D MUDLOG 1' Sperry Drilling Services Brooks Range Petroleum TOFKATI API -050-103-20567-00 2" TVD MUDLOC L T Sperry Drilling Services Brooks Range Petroleum TO F I~AT 1 AP 1-050-103-20567-00 5" M D MUDLOG T Sperry Drilling Services Brooks Range Petroleum Tofkat 1 API-50-103-20567-00 C D DATA EOWR EMF and PDF LOGS HALLIBURTON Sperry Drilling Services Error! AutoText entry not defined. Sonic Scanner Anisotropy Processing Company: Brooks Range Petroleum Field: Tofkat Well: Tofkat #1 Country: USA Log Analyst: Erika Bowen Logged: 4-Mar-2008 Processed: 10-Apr-2009 Reference: 12014324 Interval of Interest: 13070 – 3740 MD Data & Consulting Services Error! AutoText entry not defined. TABLE OF CONTENTS 1. Introduction: ............................................................................................................................... 3 2. Interpretation: ............................................................................................................................. 3 2.1 Inputs: ................................................................................................................................ 3 2.2 Technique:........................................................................................................................... 3 3. Conclusion .................................................................................................................................. 4 All interpretations are opinions based on inferences from electrical or other measurements and we cannot, and do not guarantee the accuracy or correctness of any interpretations and we shall not, except in the case of gross or willful negligence on our part, be liable or responsible for any loss, cost, damages or expenses incurred or sustained by anyone resulting from any interpretation made by any of our officers, agents or employees. These interpretations are also subject to clause 4 of our general terms and conditions as set out in our current price schedule. Sonic Anisotropy Error! AutoText entry not defined. 1. Introduction: Brooks Range Petroleum has requested that the Sonic Scanner data acquired on 4-Mar-2008 be re-evaluated for deviation affects due to the high angle of the drilled well. Compressional and shear sonic values are needed to be corrected back to the equivalent for a vertical well for AVO processing. 2. Interpretation: 2.1 Inputs: Sonic Scanner data was acquired on drill-pipe and down-logged on 4-Mar-2008. The method of acquisition caused some limitations to the data quality due to improper centralization in the borehole. Additionally due to the drill pipe conveyance, GPIT (orientation) data was not acquired with the tool. Since the tool was logged down, calipers were not run, so no borehole ID information is available. Sonic Scanner data was acquired in three sections with about 100 ft of over-lap. Final processed data was depth matched to the ARC gamma ray and spliced into a continuous file, as requested by customer. LWD data was acquired while drilling including ARC (resistivity) and ADN (density and porosity). Final provided LAS combines processed sonic and LWD. There is a general degradation of data quality above 6500MD. This may be due to higher decentralization or degradation of the borehole, rugosity and wash-out. Neither factor can be quantified with the acquired data- set. 2.2 Technique: Sonic Scanner is part of the Schlumberger wireline Scanner family of e-line measurement tools. Sonic scanner has a longer azimuthal array than other acoustic tools, 13 stations and 8 azimuthal receivers at each station. Sonic scanner is fully characterized and acquires a wide frequency spectrum with higher signal-to- noise data than previous sonic tools. Deviation correction would normally be computed from solving for the elastic moduli components, output from the 3D Anisotropy modules, and combined with bulk density, to be able to back out the horizontal and vertical velocities. C44 = ρV2SV C66 = ρV2SH C33 = ρV2PV C11 = ρV2PH CXX: elastic moduli ρ: density V: Velocity S-Shear P-Compressional V-Vertical H-Horizontal Limitations: This data set specifically is of limited data quality, since the Sonic Scanner was logged on drill-pipe tripping in the hole, and was not properly centralized. Due to the drill pipe conveyance, GPIT (orientation) was not run; tool orientation was recomputed from the relative bearing and LWD survey. Eccentraliztion causes contamination of the waveforms; specifically eccentraliztion will cause monopole waves that corrupt the dipole signal. Shear waveforms were filtered to remove late time signal to cut reduce the contamination affect. Even with filtering the processed 3D moduli were too noisy for use. Assumptions: General assumptions were applied to still allow a correction to the equivalent vertical measurement. The shear wave is dispersive, allowing direct measurement of the fast and slow shear waveforms. Fast and slow shear measurements were of fairly high quality from the anisotropy processing. The fast shear measurement can be assumed to be Shear Vertical (SH), related to C66. The slow shear measurement is assumed to be Shear Horizontal (SH), related to C44=C55. Since the deviation is consistent throughout the logged interval within 2 degrees, there is no change in deviation angle to account for, only a variation in formation Sonic Anisotropy Error! AutoText entry not defined. anisotropy. The anisotropy from the fast and slow shear was used to generate a unitless normalized anisotropy flag (1 maximum to 0 minimum). Since the deviation in the well path was constant, this anisotropy flag was used to correct the compressional velocity to the equivalent to vertical with a fixed ratio of 9%. Final processed results were compared to off-set wells and appeared to be consistent. 3. Conclusion DTCO (delta-T compressional), DTSM_SLOW (delta-T shear), and DTSM_FAST (delta-T shear) were processed with GeoFrame4.4 BestDT from the acquired waveforms. DTSM_SLOW is assumed to be Shear Horizontal (related to C44 = C55), measured anisotropy was converted to a unit less blocked curve and applied as a correction to the compressional measurement DTCO. DT is the anisotropy shifted DTCO. The final processed data was depth matched to the ARC gamma ray and combined with all available LWD data in one final LAS file with the following curves: DTCO Delta-T compressional (uncorrected for deviation) DT DTCO corrected for deviation (compressional horizontal) DTSM_FAST Delta-T of fast shear waves DTSM_SLOW Delta-T of slow shear waves (assumed as shear horizontal) DTST Delta-T of Stoneley waves PR Poisson’s ratio (from DT and DTSM_SLOW) VPVS Compressional to shear velocity ratio (from DT and DTSM_SLOW) FLAG Anisotropy flag SLOANI Slowness based anisotropy TIMANI Time based anisotropy XENEDIF Minimum and maximum cross energy differences GR_EDTC Gamma Ray - Sonic Scanner TENS Tension from Sonic Scanner run RB Relative Bearing of Sonic Scanner GR_ARC Gamma Ray - ARC A28H Attenuation Resistivity 28 inch spacing at 2MHz A34H Attenuation Resistivity 34 inch spacing at 2MHz A40H Attenuation Resistivity 40 inch spacing at 2MHz P16H Phase shift resistivity 16 inch spacing at 2 MHz P22H Phase shift resistivity 22 inch spacing at 2 MHz P28H Phase shift resistivity 28 inch spacing at 2 MHz P34H Phase shift resistivity 34 inch spacing at 2 MHz P40H Phase shift resistivity 40 inch spacing at 2 MHz DRHB Bulk density correction, bottom DRHL Bulk density correction, left DRHR Bulk density correction, right DRHU Bulk density correction, up PEB Photoelectric factor, bottom PEL Photoelectric factor, left PER Photoelectric factor, right PEU Photoelectric factor, up ROBB Bulk density, bottom ROBL Bulk density, left ROBR Bulk density, right ROBU Bulk density, up ROP5 Rate of penetration averaged over 5 feet RPM_ADN ADN rotational speed TAB_ARC Time after bit, ARC resistivity TNPH Thermal neutron porosity Sonic Anisotropy Error! AutoText entry not defined. Figure 1: Sonic Scanner anisotropy work-flow. 3D Aniso comp was too noisy for use, so provided data was processed through to the Anisotropy Post Process. Figure 2: ST plane projection showing late time contamination (slower time) of the shear waveform. The increase in slowness at later time (up-turn in the red coherence) is the monopole contamination of the shear. Sonic Anisotropy Error! AutoText entry not defined. Figure 3: TIV formation (Transverse Isotropic Vertical), C44=C55, C66 anisotropic.