Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-028~~ ~~ ~~ DATA SUBMITTAL COMPLIANCE REPORT 4/12/2010 Permit to Drill 2080280 ~ Well Name/No. TOFKAT 1A Operator BROOKS RANGE PETROLEUM API No. 50-103-20567-01-00 MD 11297 TVD 7169 Completion Date 3/28/2008 Completion Status P&A Current Status P&A UIC N REQUIRED INFORMATION Mud Log Yes Samples No Directional Survey Yes DATA INFORMATIDN Types Electric or Other Logs Run: Mud log - MWD Directional - LWD: GR/RES/Neut/Dens WL: CS/DSI/M (data taken from Logs Portio n of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments pt Report: Final Welt R 0 0 Open 5/19/2008 Gen Info, Daily Sum, Lith, Morning Report, Bit Rec, Mud Report ED C 16268 See Notes 0 0 Open 5!19/2008 AID, PDF, Excel and Mud Logs for End of Well Report og Mud Log 2 Col 3050 7200 Open 5/19/2008 TVD Mud log og Mud Log 2 Col 3987 11298 Open 5/19/2008 MD Mud log og Mud Log 5 Col 3987 11298 Open 5/19/2008 MD Mud log Rpt Directional Survey 0 11297 Open 4/26/2008 D C Las 16147 Sonic 3851 11293 Open 4/25/2008 SonicVision Best DT LAS, DLIS, &PDS ED C Las 16148 Induction/Resistively 3850 11297 Open 4/25/2008 OH LAS, PDS, Survey data og Induction/Resistivity 2 Col 3897 11297 Open 4/25!2008 TVD Visions Service 25 March 2008 og Induction/Resistivity 5 Col 3897 11297 Open 4/25/2008 TVD Visions Service 25 March 2008 Log Induction/Resistivity 2 Col 3897 11297 Open 4/25/2008 MD Visions Service 25 March 2008 og Induction/Resistivity 5 Col 3897 11297 Open 4/25/2008 MD Visions Service 25 March 2008 DATA SUBMITTAL COMPLIANCE REPORT 4112/2010 O rator BROOKS RANGE PETROLEUM API No. 50-103-20567-01-00 Permit to Drill 2080280 Well Name/No. TOFKAT 1A pe MD 11297 TVD 7169 Completion Date 3/28/2008 Completion Status P&A Current Status P&A UIC N Well CoreslSamples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? -~F-/-1~-' Analysis -YJ-Pt"~ Received? Daily History Received? `-"/ N Formation Tops ~~ N Comments: Compliance Reviewed By: Date: • • • Page 1 of 3 Maunder, Thomas E (DOA) From: Amber Babcock [amber.babcock@fepsi.com] 1®4 ~~ ~~ a®~ - ~~~ Sent: Tuesday, September 01, 2009 2:45 PM ~,~ tt To: Maunder, Thomas E (DOA) 1 a_~~ Cc: Bill Penrose; Regg, James B (DOA) t ~ ~~~ ~Q~ Subject: RE:, 2008 Site Inspections -- Follow up Attachments: Tofkat Pad & Ice Road Clean-up Photo Summary.pdf; 2008 Site Cleanup Field Summary.pdf; North Shore Pad & Ice Road Clean-up Photo Summary.pdf Tom, Please find attached the field summaries for Tofkat and North Shore along with field documentation. This summary was submitted to Brooks Range Petroleum, and it was our understanding that they were going to submit a report directly to the AOGCC. I will communicate with Brooks Range Petroleum to assure that proper documentation is filed in a timely manner for future work. Please let me know if you require anything further. Thank you, Amber Babcock ~~~:`~?~ ~~i~ ~ Z~~~ From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, August 28, 2009 11:10 AM To: Amber Babcock Cc: Bill Penrose; Regg, James B (DOA) Subject: RE: 2008 Site Inspections -- Follow up Amber and Bill, I have examined our files and do not find any information regarding the site inspections conducted at the end of August 2008. I presume you have information similar to what you sent for Altamura.. I'd appreciate if you could send the information you have. Tom Maunder, PE AOGCC From: Maunder, Thomas E (DOA) Sent: Friday, August 28, 2009 10:52 AM To: 'Amber Babcock' Cc: 'Bill Penrose'; Regg, James B (DOA) Subject: RE: 2008 Site Inspections Thanks Amber. We had that letter in our file. As I noted in my original message to Bill (text attached at end), the last item in our file was your email of August 22, 2008 regarding rescheduling the site visit due to weather and other issues. It appears that no information was submitted regarding the site inspection that was ultimately accomplished until your message of August 27, 2009. There appears to be a "gap" here and I will work to get a message out to those operators/contractors conducting site inspections. In this case, the 407 was submitted May 16, 2008 according to the document copy you emailed this morning. Although we did have an Inspector out there, I feel the operator/contractor should still submit a report of the inspection much like the protocol for BOP and safety valve tests. Incases such as this, the protocol I see as appropriate would be to submit the information attached to a 404. I will plan to get a message out outlining that protocol. 9/3/2009 • • Page2of3 Regarding the other site inspections conducted at the same time, I suspect that information regarding the inspections of Tofkat or North Shore may also not have been submitted. You may wish to check your records. I will examine ours and get back to you. Call or message with any questions. Tom Maunder, PE AOGCC From: Amber Babcock [mailto:amber.babcock@fairweather.com] Sent: Friday, August 28, 2009 10:33 AM To: Maunder, Thomas E (DOA) Subject: RE: 2008 Site Inspections My apologies. Attached is the AOGCC letter. I do not have a signed version, Chuck Rowe submitted directly. Thanks, Amber From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, August 28, 2009 10:30 AM To: Amber Babcock Subject: RE: 2008 Site Inspections Amber, You mention a letter to AOGCC. You included a letter to BLM, but I don't find one to AOGCC. Thanks, Tom From: Amber Babcock [mailto:amber.babcock@fairweather.com] Sent: Thursday, August 27, 2009 9:42 AM To: Maunder, Thomas E (DOA) Cc: Bill Penrose Subject: RE: 2008 Site Inspections Good morning Tom, Bill Penrose forwarded me your request regarding a site inspection on the Altumara #1 well. This site was inspected, on August 29, 2008. Chuck Scheve of the AOGCC inspected the site location. I am attaching the field summary, photo documentation and Anadarko's letter to the AOGCC (I do not have a signed version, sorry). Please let me know if you require any further documentation. Thank you, Amber Babcock Amber Babcock Logistics Supervisor Fairweather E & P Services, Inc. 2000 E. 88th Avenue, Suite 200 Anchorage, AK 99507 Office: 907-258-3446 Cell: 907-602-0304 From: Maunder, Thomas E (DOA) 9/3/2009 • ~ Page 3 of 3 Sent: Thursday, August 27, 2009 8:09 AM To: 'Bill Penrose' Subject: 2008 Site Inspections Bill, I was reviewing some files, Altamura #1 was one and the most recent information in the file is about from a year ago. It is an 8/22/08 email from Amber regarding the delay in some joint site inspections for Brooks Range and Anadarko. I expect the site inspections were accomplished, however I don't find anything in the file. Can you help me here? Thanks much. Tom Maunder, PE AOGCC 9/3/2009 Brooks Range Petroleum Tofkat Pad & Ice Road Site Clean-up & Inspection August 2008 • • ~;~ '~; ' , ~_ • • Tofkat pad at the start of clean-up activities M. .< _.. , v ;..~ `~ ~ . M;~ y • y ~. ~ , ~~ ~ t Y ^'" 1 ~ t yr `s Q~ ~ f~~t~ A ~`~. C'~wu~~.~q,L'~~~ r ,. :~ ~ _ .~ ~ ~ ~-..G y4F ' ' yrt s ~a " F9 Y 1 > - ~ ~~ - ~ ~ ~> i Tofkat pad at the start of clean-up activities • • Tofkat wellhead excavation berm at the start of clean-up activities Photo courtesy of AOGCC Tofkat pad and ice road after clean-up. Photo taken during inspection. cv 41 L v +~ c~ V X dJ fa 4.J s v afl c U v a N L CO v N o Q _ ~ (./) a, ~ ~ L o O za F & P SfR! ICES. !F.'C Brooks Range Petroleum Corporation North Shore and Tofkat Summer Clean-Up Work Field Activity Summary Submitted by: Amber Babcock, Fairweather E&P Services, Inc. August 26, 2008 The North Shore site was accessed by helicopter with two personnel. A vehicle was staged at S-pad with two additional personnel (due to weight restriction on the helicopter) that were later transported to the site. The clean-up crew picked up debris on and around the pad area. The helicopter transported 10 sling-loads of material to the vehicle staged at S-pad to include large timbers, one 3.5"diameter piece of tubing and several bags of miscellaneous debris. August 27, 2008 Equipment was obtained. to cut the timbers and. tubing to manageable sizes, to allow transport by vehicle to Deadhorse for disposal. A crew of three and equipment mobilized to S-pad and loaded the cut debris onto the vehicle. Two additional personnel performed stick picking of the ice road route. Approximately 50 helicopter landings were made along the route. The weather deteriorated midday and delayed operations from Noon until 5:00 PM at which time stick picking activities resumed. August 28, 2008 A crew of four personnel continued performing stick picking along the ice road route. Approximately 301andings were made along the route and at the pad area. Flight hours = 3.2. August 29, 2008 A site inspection via. helicopter was performed by Gerald Nayakik with the North Slope Bureau, John Easton with the State of Alaska Department of Natural Resources and Chuck Scheve with the Alaska Oil and Gas Conservation Commission. Some additional debris (11 items) was located during the inspection. 2000 East 88`~ Avenue, Suite 200 • Anchorage, Alaska 99507 • (907) 258-3446 • Fax (907) 279-5740 August 30, 2008 The Totkat site was accessed by helicopter with two personnel. A vehicle was staged at DS2L pad with one additional person that was later transported to the site. The clean-up crew picked up debris on and around the pad area. Tlu•ee sling loads of debris were transported from the site along with several bags of debris. August 31, 2008 The Tofkat site was accessed by helicopter with two personnel. A vehicle was staged at DS2L pad with one additional person that was later transported to the site. The clean-up crew picked. up debris along the ice road route. Several bags of debris were transported from the site. Photo documentation is unavailable due to equipment failure. A site inspection was performed by Gerald Nayakik with the North Slope Bureau and Chuck Scheve with the Alaska Oil and Gas Conservation Commission. Mr. Scheve has agreed to submit data to John Easton with the State of Alaska Department of Natural Resources. One additional item of debris was located during the inspection. End of report • 1 M. .~. V 1 Vl L.r Maunder, Thomas E (DOA) From: Amber Babcock [amber.babcock@fairweather.com] Sent: Friday, August 22, 200810:39 AM To: Maunder, Thomas E (DOA); Weaver, Aaron A (DNR); Schultz, Gary (DNR); gordon.brower@north- slope.org; Lynch, Leon C (DNR); Schmitz, Steven (DNR); Waska Williams; Byme, Laun3nce C (DNR); Crisp, John H (DOA); Scheve, Charles M (DOA); Regg, James B (DOA}; Donna Wixon@ak.btm.gov; Easton, John R (DNR) Cc: Weissert, Robin; Jim V1/inegamer Subject: RE: Brooks Range & Anadarko -Joint Site Inspections ~~~--- d a-~ . Good afternoon all, Due to weather and scheduling of helicopter use it is likely that agency inspections of Tvfkat, North Shore and Altamura maybe pushed back one day. We are working diligently to keep on track for Aug. 28th; however we would like to make sure that your personnel are available on Aug. 29th in the event that the inspection is delayed by one day. Please confirm your (or your designees) availability on Aug. 29th I have the following people scheduled: NSB -Gerald Nayakik, Cell: (907) 878-2193 DNR -John Easton, Cell: need AOGCC -Chuck Scheve, Pgr: (907) 659-3607 {pending confirmation) BLM -Donna Wixon; Iridium 011-8816-414-31120 -may not be able to attend Thank you, Amber __ From: Amber Babcock Sent: Wednesday, August 13, 2008 4:41 PM To: (tom.maur~er@alaska.gov); Aaron Weaver (aaron weaver@dnr.state.ak.us); Donna Nocon {dwixon@bfm.gov); Gary Schultz (gary_schultz@dnr.state.ak.us); gonion.brower@north-siope.org; Lin Lynch {leoa lynch@dnr.state.ak.us); Steve Schmitz (ss@dnr.state.ak.us); 'Waska WNliams' Cc: 'Weissert, Robin'; Tim Winegamer Subject: Brooks Range & Anadarko -Joint Site Inspections Good afternoon all, Fairweather E & P Services, Inc. will be coordinating site clean-up, agency visits and other activities at various locations throughout the North Slope on behalf of Brooks Range Petroleum Corporation (BRPC) and Anadarko Petroleum Corporation. • Brooks Range Petroleum Corporation - Tofkat and North Shore Drilling Exploration Sites • Anadarko Petroleum Corporation -Altamura P8~A Site We would like to invite an inspector from your agency to visits all three sites on August 28, 2008 departing from Deadhorse. The attached document provides site locations and details of the planned activities for your review. Please respond at your convenience, with the requested information in the attached document to assist wiri~ 8/13/2009 • Site Cleanup 8 Agency Visits for: Brooks Range Petroleum Corporation (Tofkat Exploration Sites) * 1~Trade etroleum Corpor a~~ {AID tam P.)„~ Fairweather E i~ P Services, Inc. will be coordinating site clean-up, agency visi#s and other activities at various locations on the North Slope on behalf of Brooks Range Petroleum Corporation (BRPC) and Anadarko Petroleum Corporation in late August 2008. BRPC and Fairweather have contracted with Air Logistics to provide air transportation in a Bell 206E helicopter (maximum of six passenger seats, however weight and balance restrictions may limit the payload). The helicopter is contracted from August 26"' through August 30"'. • Fairweather will conduct all clean-up ac#ivities at Anadarko's Altamura plug and abandonment site. • Fairweather is coordinating with and will assist BRPC as requested for clean-up activities at their Tofkat and North Shore drilling exploration sites. Primarily this will consist of scheduling agency visits and coordinating helicopter flight operations as needed. Following is a general summary of the intended project activities; and therefore is subject to change as necessary to complete the project objectives. Altamura is located approximately 20 nm ConocoPhillips annual Alpine ice road w utilized the cation) as the origination point fo e.r4ltar ice road. Anadarko built a six mile spur from the Cono'c~'Phitfips-ice seal-e ~ by 275 foot ice pad to support their well plugging and abandoning operations. ~~~~ ~' ~, add-~'1~ Tofkat Exploratory Drilling Site (BRPC) 1c~4~.k `'`~ A ae7~s`'oa-~S" ~~~~ `' ~.R chi ~~S d`'1 `O \ +c~ r~i. ~~~r ~~, Tofkat is located approximately'/2 mile east o the Colville raver. Road access to the ice pad was provided~~~S t~~Q by a half mile ice spur road that was connected to ConocoPhillips annual Alpine ice road. Both the pad area and spur road will be cleaned and inspected. The North Shore ice pad location is north o - field. A Shore ice pad was provided by asix-mile-Ion ~ ~u south of - a rea a one and inspected. ?4Q0 East ~S'i' .~~=enue. Suite 2(tQ • 4~achora~re, Alaska 99~Q7 • (9tJ7}~2~8-3446 • Fax (907 279-5140 EEIVED Brooks Ran a Petro l e u m ~~Y ° 5 2008 9 ~ ~ '~~~~~~ Oil ~ Gas Cons. Commissi a subsidiary ofAVCG, LLC on Anchorage 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 May 5, 2008 Mr. Dan Seamount, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Well Completion Report Brooks Range Petroleum Corporation: Tofkat #lA (PTD # 208-028 / P&A Sundry # 308-097) Dear Commissioner Seamount, Brooks Range Petroleum Corporation hereby submits its Well Completion Report for the work performed in drilling, plugging and abandoning its Tofkat #lA exploration well on the North Slope. Please find enclosed the following information for your files: 1) Form 10-407 Well Completion or Re-completion Report and Log 2) Well As-Built Survey 3) Wellbore Schematics 4) Well Operations Summary 5) Directional survey for the final wellbore Copies of the mud log and all LWD, MWD and wireline logs run will be submitted under separate cover as they become available. If you have any questions or require additional information, please contact me at (907) 339-9965 Sincerely, RANGE PETROLEUM CORPORATION Bart Armfield Vice President -Operations cc: Jim Winegarner -Brooks Range 1a. Well Status: Oil ^ Gas ^ Plugged Q Abandoned 0 • Suspended ^ 20AAC25.105 2o,aac2s.iio GINJ^ WINJ^ WDSPL^ WAG^ Other^ No. of Completions: 1 b:'Well Class: ~ ; =rage Development ^ Exploratory0. Service ^ StratigraphicTest^ 2. Operator Name: Brooks Range Petroleum Corporation 5. Date Comp., Susp., or Aband.: 3/28/2008 12. Permit to Drill Number: •208-028 (P&A Sundry 308-097) 3. Address: 510 L Street, Suit 601, Anchorage, AK, 99501 6. Date pudded: 3!21/2008 13. API Number: 50-103-20567-01 4a. Location of Well (Governmental Section): Surface: 661 FSL 1808 FEL S11 T10N R5E UM 7. Date TD Reached: 3/25/2008 14. Well Name and Number: Tofkat 1A . Top of Productive Horizon: 11,121 MD 861 FSL 2387 FEL S15 T10N R5E UM 8. KB (ft above MSL): 52.5 Ground (ft MSL): 20 15. Field/Pool(s): Total Depth: .13~ ~~ x~G~pp ~ SAS T/v.J 1Z5~ ~ 11,297' MD ON R5E UM ~ r'•6. 9. Plug Back Depth(MD+TVD): N/A Exploratory • 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 402239.10 • y- 5934319.60 " Zone- 4 10. T~~pth (MD + D): t~J MD /~TV S 6. Property Designation: S`~ADL~90676 TPI: x- 396320.00 ~ '~ I/ ,y- 5929318.00'r~ r~,O )Z n - 4 Total Depth: x- ~8P2:3'I ~pW~ y- 5930775.38 jj~I Z -~ 4 11. SSSV Depth (MD + TVD): N/A 17. Land Use Permit: N/A 18. Directional Survey: Yes Q No (Submit electronic and printed information per 20 AAC 25.050) 19. Water Depth, if Offshore: N/A (ft MSL) 20. Thickness of Permafrost (TVD): 1,190' 21. Logs Obtained (List all logs here and submit electronic and printed infonnation per 20 AAC 25.071): Mud Log - MWD Directional - LWD: GR/RES/Neut/Dens WL: CSI/DSI/MDAT 22• CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16" N/A N/A surface 123' surface 123' 20" grouted to surface None 9-5/8" 40 # L-80 12.5' 3857' 12.5' 3857' 12-1 /4" CMTD to surface 370 bbls None 23. Open to production or injection? Yes ^ No^ If Yes, list each 24. TUBING RECORD interval open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET (MD) PACKER SET (MD) 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED N/A 26• PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): Date of Test: Hours Tested: Production for Test Period Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate ~ Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity -API (corr): 27. CORE DATA Conventional Core(s) Acquired? Yes ^ No ^~ Sidewall Cores Acquired? Yes ^ No ^~ If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20ppAAC 25.071E ~~j.~w./(~. ~~fti~T p4~ v~~l~~ n .~ ~F~~ ,iui~ 2 ~ ZOQa vi u i i u-wv i Rewsea utuu i STATE OF ALASKA ~ MAY 0 5 2008 ALAS OIL AND GAS CONSERVATION COMM ION WELL COMPLETION OR RECOMPLETION REP a~il~~• commission CONTINUED ON REVERSE SIDE ~r-r~~~~`~~L ~~~~~ 28. GEOLOGIC MARKERS (List all formations and markers encountered): 29. FORMATION TESTS NAME MD TVD SS Well tested? Yes ~ No ~ If yes, list intervals and Nanushuk Sd 5938 -4154 formations tested, briefly summarizing test results. Attach separate sheets to C-40 6232 -4350 this form, if needed, and submit detailed test information per 20 AAC 25.071. top Turbidites 8903 -5865 H RZ 10450 -6757 Kalubik 10844 -6967 LCU 11121 -7097 TD 11297 -7169 30. List of Attachments: Wellbore schematics, pad as-built diagram, summary of operations, directional surveys 31. I hereby certify that he foregoing is true and correct to the best of my knowledge. Contact: Bill Penrose 258-3446 Printed Na e: art field Title: Vice President - Operat'ons Signatur . Phone: 339-9965 Date: INSTRUCTIONS General: This form is designed for sub in mplete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 2/2007 DATE: 02-8-08 SCALE: 1 " 0' SHEET: 1 OF 1 c~A A TOFKAT 1 HARRISON Y BAY 1 NOTES: 1) COORDINATES SHOWN HEREON BASED UPON AS-BUILT SURVEY CONDUCTED 01-31-08 2) ALL DISTANCES AND ELEVATIONS ARE IN U.S. SURVEY FEET 3) VERTICAL DATUM: MSL (GEOID 2006, ALASKA) 4) PROTRACTED SECTION LINES SHOWN HEREON ARE APPROXIMATE AND FOR REFERENCE ONLY "TOFKAT 1 " ~ ~~ AS-BUILT W z ~ ~ w d 06 a oa ~z H J N ~ O W Z tP0 O d O~ 0 100 200 ~ SCALE IN FEET /~ ~g9 ,o. / o ~ / 0 / k 0 / ~, N 6~5 ~~ / / ps. ~ / \ ~//\~/.~s~ "TOFKAT1" O~ t~ C' p0 ~ RAG ~G6 pPp/ tSO. ~'~Z ~j~%N/ / O0a /~% Olaf ~ / ~pMe ""TO T 1"" ~~o~ 9 Oc~ GPMe PPo E AGE creek a ,a Y Fish NUIOSUT `d 0 4 , ~ _. I it 12". I - e - - , rtF ~, PAp ~~! . ~ ° .~;~~. t' . ~ , I r ,~~ Rya ` Is ~.; VICINITY MAP -NOT TO SCALE LEGEND ~ CONDUCTOR N 0 0 w W Uf (n ~ ~ ~ w w ~ ~ ~ ~ z z 0 0 ~ I ~ 1 sost' ~~- ALPINE RE-SUPPLY ICE ROAD "TOFKAT 1"WELL LOCATED WITHIN T. 10N., R. 5 E., U.M., SECTION 11 NAD 27, ZONE 4' LAT: 70°13'48.188" N LONG: 150°4T20.709" W N = 5,934,319.6 ~ E = 402,238.8 ~ NAD 83, ZONE 4 LAT: 70°13'47.012" N LONG: 150°4T31.902° W N = 5,934,067.65 E = 1,542,273.06 PAD ELEV = 19.8' MSL / • CONVERTED FROM NAD 83 BY NADCOM -= ~ ~F~ A~glll .S /~ •' •:9 ~ *': 4g TH .* r~~ T10N,R5E,UMSECTION 11 SURVEYORS CERTIFICATE ~ - - ~ T 10 N, R 5 E, UM SECTION 14 / ^rf"..~.~.~1~~•0a~ I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE ) 'KENNETH J. PINARD ~ ~/ STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT I~ ~ ° SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JANUARY 31, 2008 `+~ ~~F ° . No. 11545 ~~~ . Q r ~c ll~l~ OFESSIONA~~~~+ etb EAST SIAVFNUESUIIE ]00, ANL,L, AN B"51b \\"`~~ an Ukpeagvik Inupiat Coryoration Company BROOKS RANGE PETROLEUM DRAWN BY: LHH CHECKED BY: KJP W.O. No: 2007-217 Brooks Range Petroleum Corporation Tofkat #1A Wellbore Schematic P&A 12-1/4" hole 10.0 ppg mud 10.0 ppg mud 16" conductor at 123' TOC at 3,598' MD w.~ ,~ ~ 9-5/8" casing at 3,898'MD BOC at 4,400' MD 8-1 /2" hole TD at 7,169' TVD / 11,297'MD adb 05//01/08 Brooks Range Petroleum OPERATIONS SUMMARY Brooks Range Petroleum Corporation Tofkat lA March 19, 2008 3,898' MW 10.0 ppg Vis 156 sec Inc160.00 deg Finish POH w/ cmtg stinger. Test BOPE, witnessed by AOGCC rep. M/U directional drilling assy, RIH. March 20, 2008 3,898' MW 10.1 ppg Vis 265 sec Inc160.00 deg RIH to 1,120, shallow test tools. R_IH to 3,684', wash to 3,860'. RIH to 4,447' - no cement. C&C, POH, S/B BHA. P/LT 499' of 2-7/8" cmtg stinger, RIH w/ it on DP to 4,587'. Spot 26 bbls 15.8 ppg_viscous pill. Pull up to 4,302', pump 15 bbls 10 ppg spacer, 27 bbls 15.8 ppg cements 5 b__bls 10 pig spacer, disp,,lace w/ mud. CIP at 2200 hrs. CBU, POH. March 21, 2008 4,732' MW 9.9 ppg Vis 179 sec Inc157.83 deg POH w/ cmtg string, L/D tools. M/U directional drlg BHA, RIH to 3,398'. Cic while WOC. RIH to 3,589', wash to 3,970'. Tag cmt at 3,970', wt test w/ 20K lbs. Orient drlg tools, work back and forth btwn 3,940' and 3,970' to trench side of hole for kickoff. ~ Control dri113,970' to 4,025'. Directionally drill 8-1/2" hole 4,025' to 4,732'. March 22, 2008 6,067' MW 10.1 ppg Vis 179 sec Incl 53.80 deg C&C mud, POH to KOP and work BHA through it. RIH, drill 4,732' to 5,780'. Make wiper trip to 5,494' -hole in good condition. Dri115,780' to 6,067'. March 23, 2008 7,715' MW 10.0 ppg Vis 130 sec Inc155.92 deg Directionally dri118-1/2" hole 6,067' to 6,732'. CBU, make wiper trip to 4,700' and back to btm -hole in good condition. Dri116,732' to 7,715'. i • March 24, 2008 9,366' MW 10.0 ppg Vis 130 sec Incl 53.70 deg Make short wiper trip 7,778' to 7,497' -hole in good condition. Directionally drill 8- 1/2" hole 7,778' to 8,726'. Make long wiper trip 8,726' to 6,454'. Pull 30K# over - work until cleaned up. RIH to btm, dri118,726' to 9,366'. March 25, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg Directionally dri118-1/2" hole 9,366' to 11,297'. Pump slug and POH. March 26, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg POH, L/D BHA. Test BOPE. M/U mule shoe on drill pipe, RIH for mud change-out. March 27, 2008 11,297' MW 10.0 ppg Vis 85 sec Incl 66.67 deg Continue RIH to TD. C&C mud while waiting for delivery of WBM system. Displace OBM from hole w/ WBM. POH to csg shoe, clean contaminated mud from flowline and pump suctions. March 28, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg Finish cleaning pump suctions, POH. P/U 2-7/8" cementing stinger on DP, R,_ IH to 4,760' Spot 25 bbls hi-vis 15.8_pp~~ll. Pull up to 4 400' R/U to cement. Spot u_. .. _~.~.~.~_~~_~ balanced plug of 52 bbls Class G cement at 15.8 p_pg. Pull up 10 stands. First 6 stands pulled dry, last 4 stands pulled wet. Attempt to pump through DP w/ no success. POH wet - 9 jts DP and a1121 jts 2-7/8" stinger plugged w. cmt. M/LJ cleanout assy to check for top of cmt plug. FINAL REPORT (Subsequent operations attributed to Tofkat #1B.) Page 2 of 2 Operation Summary: Tofkat 1 Brooks Range Petroleum Corporation Schlumberger i orKat -i ~- au rceport Report Date: March 26, 2008 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: Brooks Range Petroleum Vertical Section Azimuth: 248.420° Field: North Slope Brooks Range Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: Toflcat 1 /Tofkat 1 ND Reference Datum: Rotary Table Well: Toflcat 1 ND Reference Elevation: 52.70 ft relative to MSL Borehole: Tofkat 1A Sea Bed 1 Ground Level Elevation: 19.80 ft relative to MSL UWIIAPI#: 501032056701 Magnetic Declination: 22.244° Survey Name I Date: Tofkat 1 A I March 24, 2008 Total Field Strength: 57577.170 nT Tort I AHD 1 DDI I ERD ratio: 153.704° / 8086.94 ft / 6.292 11.128 Magnetic Dip: 80.637° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 24, 2008 Location LaHLong: N 7013 48.186, W 150 47 20.709 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5934319.600 ftUS, E 402238.800 ftUS North Reference: True North Grid Convergence Angle: -0.74258124° Total Corr Mag North -> True North: +22,244° Grid Scale Factor: 0.99991086 Local CooMinates Referenced 70: Well Head • Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft R ft it ft nn de 100 ft n nn ftUS Cn7A7An Cn ftUS An7n70 On AI 7n A'2 AO ~4C \A/ ~~n A7 7n 7f10 KIh U.VU V.UU V.VU -VL./U U.VU V.UU V.VV V.VV V.VV V.VV V.VV JJJ'fJl ~ ~v rV ~J ~V.~V r• -r~ cv.~v.i Inc only 202.59 0.14 239.11 149.89 202.59 0.24 0.25 0.25 -0.13 -0.21 0.07 5934319.48 402238.59 N 70 13 48.185 W 150 47 20.715 Inc Only 295.23 0.37 239.11 242.53 295.23 0.65 0.66 0.66 -0.34 -0.57 0.25 5934319.27 402238.23 N 70 13 48.183 W 150 47 20.726 MWD 388.31 1.42 239.11 335.60 388.30 2.09 2.11 2.11 -1.09 -1.81 1.13 5934318.54 402236.97 N 70 13 48.175 W 150 47 20.762 480.36 2.52 243.75 427.59 480.29 5.23 5.28 5.27 -2.57 -4.61 1.21 5934317.09 402234.16 N 70 13 48.161 W 150 47 20.843 571.40 4.99 248.35 518.43 571.13 11.18 11.24 11.22 -4.91 -10.08 2.73 5934314.82 402228.65 N 70 13 48.138 W 150 47 21.002 663.14 6.42 251.73 609.71 662.41 20.29 20.35 20.30 -7.99 -18.66 1.60 5934311.85 402220.04 N 70 13 48.107 W 150 47 21.252 754.81 7.22 250.23 700.73 753.43 31.17 31.24 31.17 -11.55 -28.95 0.89 5934308.43 402209.70 N 70 13 48.072 W 150 47 21.550 848.21 9.01 244.10 793.20 845.90 44.33 44.41 44.33 -16.73 -41.05 2.13 5934303.41 402197.54 N 70 13 48.021 W 150 47 21.902 939.56 10.60 248.15 883.21 935.91 59.86 59.96 59.87 -22.98 -55.29 1.90 5934297.34 402183.22 N 70 13 47.960 W 150 47 22.316 1036.82 12.60 247.45 978.48 1031.18 79.42 79.51 79.43 -30.38 -73.39 2.06 5934290.18 402165.03 N 70 13 47.887 W 150 47 2 1133..01 14.30 247.43 1072.03 1124.73 101.79 101.89 101.80 -38.96 -94.05 1.77 5934281.86 402144.26 N 70 13 47.803 W 150 47 2 1228.76 15.35 246.31 1164.59 1217.29 126.28 126.39 126.30 -48.59 -116.58 1.14 5934272.53 402121.61 N 70 13 47.708 W 150 47 24. 6 1325.63 17.89 249.11 1257.40 1310.10 153.97 154.08 153.99 -59.05 -142.22 2.75 5934262.40 402095.84 N 70 13 47.605 W 150 47 24.841 1421.43 20.07 249.67 1347.99 1400.69 185.12 185.24 185.14 -70.01 -171.39 2.28 5934251.82 402066.54 N 70 13 47.497 W 150 47 25.689 1516.67 22.31 249.18 1436.79 1489.49 219.54 219.66 219.55 -82.11 -203.61 2.36 5934240.14 402034.16 N 70 13 47.378 W 150 47 26.625 1613.08 24.50 249.07 1525.26 1577.96 257.83 257.96 257.83 -95.76 -239.39 2.27 5934226.96 401998.21 N 70 13 47.244 W 150 47 27.664 1709.29 26.87 248.33 1611.96 1664.66 299.53 299.65 299.53 -110.92 -278.24 2.49 5934212.31 401959.18 N 70 13 47.095 W 150 47 28.793 1805.79 30.01 248.11 1696.80 1749.50 345.48 345.61 345.48 -127.97 -320.90 3.26 5934195.81 401916.29 N 70 13 46.927 W 150 47 30.033 1902.10 32.60 248.76 1779.08 1831.78 395.52 395.64 395.52 -146.35 -367.44 2.71 5934178.03 401869.52 N 70 13 46.747 W 150 47 31.385 1999.32 35.12 250.20 1859.81 1912.51 449.67 449.80 449.67 -165.32 -418.17 2.72 5934159.73 401818.56 N 70 13 46.560 W 150 47 32.859 2095.66 37.92 249.95 1937.22 1989.92 506.97 507.13 506.97 -184.86 -472.07 2.91 5934140.89 401764.42 N 70 13 46.368 W 150 47 34.424 2191.36 40.17 249.44 2011.54 2064.24 567.23 567.41 567.24 -205.78 -528.60 2.37 5934120.70 401707.63 N 70 13 46.162 W 150 47 36.067 SurveyEditor Ver SP 2.1 Bld(doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1A\Tofkat 1A Generated 5/1/2008 10:50 AM Page 1 of 4 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft ____ _' de "_ _' de _ "_ __ ft ..,..... .. ft ....... .. ft ,.......,. ft ..... ..~ ft ...... .... ft nnn ~.. ft cn~ n~ de 1100 ft n nc ftUS cnn ~nnn cn ftUS enec~~ n~ r.i ~n ~o ~e noc ~n/ een e~ o~ inn ZZtf/.3tf 4L.`9U L4ts.L/ ZUtf3.41 0130.11 Osu.Oa 03i.Vi v3u.au -cco.ro -ao/.~/ c.av JDJYV~V.JV YVIVY/A/ IY /V IJYJAJV Y ..- 2383.24 45.30 247.47 2152.25 2204.95 697.59 697.78 697.60 -253.90 -649.75 2.57 5934074.16 401585.87 N 70 13 45.689 W 150 47 39.587 2479.63 47.25 247.29 2218.87 2271.57 767.24 767.43 767.24 -280.69 -714.05 2.03 5934048.21 401521.24 N 70 13 45.425 W 150 47 41.454 2575.36 49.80 248.45 2282.27 2334.97 838.95 839.15 838.95 -307.70 -780.49 2.81 5934022.07 401454.46 N 70 13 45.159 W 150 47 43.385 2672.52 52.47 248.45 2343.23 2395.93 914.60 914.79 914.60 -335.48 -850.85 2.75 5933995.20 401383.76 N 70 13 44.886 W 150 47 45.429 2769.60 55.53 248.31 2400.28 2452.98 993.13 993.32 993.13 -364.42 -923.85 3.15 5933967.22 401310.39 N 70 13 44.601 W 150 47 47.550 2865.78 58.37 248.63 2452.73 2505.43 1073.73 1073.93 1073.74 -394.00 -998.84 2.97 5933938.62 401235.03 N 70 13 44.310 W 150 47 49.728 2962.06 58.24 249.48 2503.32 2556.02 1155.65 1155.85 1155.65 -423.28 -1075.34 0.76 5933910.33 401158.16 N 70 13 44.022 W 150 47 51.951 3056.42 58.98 249.61 2552.47 2605.17 1236.18 1236.40 1236.19 -451.43 -1150.81 0.79 5933883.16 401082.34 N 70 13 43.745 W 150 47 54.143 3152.53 59.54 248.63 2601.59 2654.29 1318.78 1319.01 1318.79 -480.87 -1227.99 1.05 5933854.72 401004.79 N 70 13 43.456 W 150 47 56.385 3248.84 60.04 248.31 2650.05 2702.75 1402.01 1402.24 1402.02 -511.42 -1305.41 0.59 5933825.19 400926.99 N 70 13 43.155 W 150 47 58. 3345.15 58.82 247.57 2699.04 2751.74 1484.93 1485.16 1484.93 -542.56 -1382.27 1.43 5933795.05 400849.75 ~ N 70 13 42.849 W 150 48 0 3441.41 59.74 248.10 2748.21 2800.91 1567.67 1567.91 1567.68 -573.78 -1458.90 1.07 5933764.83 400772.72 N 70 13 42.542 W 150 48 3.093 3539.10 60.30 247.14 2797.03 2849.73 1652.28 1652.53 1652.28 -606.00 -1537.15 1.03 5933733.63 400694.07 N 70 13 42.224 W 150 48 5.366 3634.56 60.14 247.78 2844.44 2897.14 1735.13 1735.38 1735.13 -637.76 -1613.67 0.61 5933702.87 400617.15 N 70 13 41.912 W 150 48 7.589 3730.23 60.17 247.67 2892.05 2944.75 1818.10 1818.36 1818.10 -669.21 -1690.46 0.10 5933672.41 400539.97 N 70 13 41.602 W 150 48 9.819 TD (Csg @ 3897) 3824.52 60.69 248.10 2938.58 2991.28 1900.11 1900.37 1900.11 -700.08 -1766.43 0.68 5933642.53 400463.60 N 70 13 41.299 W 150 48 12.026 Tie-In Survey 3824.52 60.69 248.10 2938.58 2991.28 1900.11 1900.37 1900.11 -700.08 -1766.43 1.56 5933642.53 400463.60 N 70 13 41.299 W 150 48 12.026 KOP Point 3940.00 60.02 247.90 2995.70 3048.40 2000.47 2000.74 2000.47 -737.68 -1859.49 0.60 5933606.15 400370.08 N 70 13 40.929 W 150 48 14.730 (Interpolated) MWD 4001.58 58.48 246.19 3027.18 3079.88 2053.37 2053.66 2053.37 -758.31 -1908.22 3.46 5933586.15 400321.09 N 70 13 40.726 W 150 48 16.145 4096.60 59.11 242.78 3076.42 3129.12 2134.43 2134.92 2134.45 -793.32 -1981.54 3.14 5933552.10 400247.32 N 70 13 40.381 W 150 48 18.275 4191.82 59.40 240.71 3125.11 3177.81 2215.71 2216.76 2215.78 -832.06 -2053.62 1.89 5933514.30 400174.75 N 70 13 40.000 W 150 48 20.369 4287.82 59.51 237.36 3173.91 3226.61 2297.26 2299.43 2297.48 -874.59 -2124.50 3.01 5933472.69 400103.34 N 70 13 39.581 W 150 48 22.427 4381.45 58.79 234.48 3221.93 3274.63 2375.73 2379.81 2376.24 -919.62 -2191.07 2.75 5933428.54 400036.19 N 70 13 39.138 W 150 48 24.361 4478.09 56.62 232.63 3273.56 3326.26 2454.68 2461.49 2455.68 -968.13 -2256.79 2.77 5933380.89 399969.86 N 70 13 38.661 W 150 48 26.269 4573.36 56.55 228.59 3326.04 3378.74 2530.36 2541.00 2532.13 -1018.57 -2318.23 3.54 5933331.25 399907.78 N 70 13 38.165 W 150 48 28.054 4666.95 57.83 224.39 3376.77 3429.47 2603.29 2619.65 2606.24 -1072.73 -2375.24 4.01 5933277.84 399850.08 N 70 13 37.632 W 150 48 29.710 4763.35 56.85 222.41 3428.79 3481.49 2676.83 2700.80 2681.51 -1131.68 -2431.00 2.01 5933219.62 399793.56 N 70 13 37.052 W 150 48 31~ 4858.49 56.23 222.42 3481.25 3533.95 2748.17 2780.18 2754.94 -1190.28 -2484.54 0.65 5933161.72 399739.27 N 70 13 36.476 W 150 48 32. 4953.59 55.05 222.45 3534.92 3587.62 2818.74 2858.68 2827.90 -1248.22 -2537.51 1.24 5933104.48 399685.56 N 70 13 35.906 W 150 48 34.422 5048.61 54.11 221.56 3589.99 3642.69 2888.09 2936.11 2899.94 -1305.76 -2589.33 1.25 5933047.63 399633.00 N 70 13 35.340 W 150 48 35.927 5144.29 54.47 220.47 3645.84 3698.54 2957.06 3013.80 2972.00 -1364.38 -2640.31 1.00 5932989.68 399581.27 N 70 13 34.763 W 150 48 37.407 5239.88 54.65 221.51 3701.27 3753.97 3026.18 3091.68 3044.50 -1423.16 -2691.39 0.91 5932931.57 399529.43 N 70 13 34.184 W 150 48 38.890 5334.54 54.91 221.01 3755.86 3808.56 3094.98 3169.01 3116.88 -1481.29 -2742.39 0.51 5932874.11 399477.69 N 70 13 33.613 W 150 48 40.371 5429.55 55.19 220.81 3810.29 3862.99 3164.05 3246.89 3189.84 -1540.15 -2793.39 0.34 5932815.92 399425.94 N 70 13 33.034 W 150 48 41.852 5525.61 54.54 220.27 3865.57 3918.27 3233.49 3325.45 3263.50 -1599.84 -2844.45 0.82 5932756.90 399374.11 N 70 13 32.446 W 150 48 43.334 5620.09 54.53 219.87 3920.39 3973.09 3301.21 3402.40 3335.65 -1658.73 -2893.99 0.34 5932698.66 399323.83 N 70 13 31.867 W 150 48 44.773 5716.02 54.53 220.96 3976.05 4028.75 3370.19 3480.52 3409.27 -1718.21 -2944.64 0.93 5932639.85 399272.41 N 70 13 31.282 W 150 48 46.243 5810.51 54.59 220.26 4030.85 4083.55 3438.28 3557.51 3482.10 -1776.66 -2994.74 0.61 5932582.06 399221.56 N 70 13 30.707 W 150 48 47.698 5906.69 54.34 221.73 4086.75 4139.45 3507.75 3635.77 3556.48 -1835.73 -3046.08 1.27 5932523.67 399169.46 N 70 13 30.126 W 150 48 49.189 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1A\Tofkat 1A Generated 5/1/2008 10:50 AM Page 2 of 4 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 6UUL.Uy 94.4/ ZZ1.4y 414Y.Z/ 4l`J4.`JI 30ro.aa 3/IS.JO ooou.oi -ioaaro rouyr.ov V.LJ JSJLYVVAY JJ.711/.LV IV /V IJ GJ.JJJ v ~.w ~u av.vu~ 6096.44 53.86 222.15 4197.51 4250.21 3645.38 3789.84 3703.92 -1950.73 -3148.60 0.86 5932410.01 399065.47 N 70 13 28.994 W 150 48 52.165 6191.62 53.25 220.48 4254.06 4306.76 3713.53 3866.40 3777.24 -2008.23 -3199.15 1.55 5932353.18 399014.19 N 70 13 28.428 W 150 48 53.632 6284.51 53.97 221.19 4309.17 4361.87 3779.81 3941.17 3848.79 -2064.81 -3248.04 0.99 5932297.25 398964.57 N 70 13 27.872 W 150 48 55.052 6382.74 53.87 221.13 4367.02 4419.72 3850.38 4020.56 3925.02 -2124.58 -3300.29 0.11 5932238.16 398911.55 N 70 13 27.284 W 150 48 56.569 6475.96 54.54 219.88 4421.54 4474.24 3917.19 4096.17 3997.49 -2182.07 -3349.40 1.30 5932181.32 398861.71 N 70 13 26.718 W 150 48 57.994 6572.25 54.35 220.94 4477.53 4530.23 3986.35 4174.51 4072.66 -2241.72 -3400.18 0.92 5932122.34 398810.16 N 70 13 26.131 W 150 48 59.469 6667.43 54.63 220.98 4532.82 4585.52 4055.10 4251.99 4147.32 -2300.22 -3450.97 0.30 5932064.50 398758.63 N 70 13 25.556 W 150 49 0.943 6763.11 54.29 221.79 4588.43 4641.13 4124.44 4329.84 4222.59 -2358.64 -3502.44 0.78 5932006.76 398706.41 N 70 13 24.981 W 150 49 2.437 6858.55 54.67 221.55 4643.88 4696.58 4193.81 4407.52 4297.88 -2416.66 -3554.08 0.45 5931949.42 398654.02 N 70 13 24.410 W 150 49 3.936 6953 83 55 48 221 73 4698.43 4751.13 4263.55 4485.64 4373.67 -2475.04 -3605.99 0.86 5931891.72 398601.37 N 70 13 23.835 W 150 49 5.443 . 7048.64 . 55.44 . 221.91 4752.19 4804.89 4333.38 4563.74 4449.58 -2533.25 -3658.07 0.16 5931834.20 398548.55 N 70 13 23.263 W 150 49 6~ 7143.10 55.37 220.88 4805.82 4858.52 4402.65 4641.50 4525.10 -2591.58 -3709.48 0.90 5931776.55 398496.38 N 70 13 22.689 W 150 49 8.447 7240.00 54.99 221.02 4861.15 4913.85 4473.23 4721.05 4602.29 -2651.66 -3761.62 0.41 5931717.15 398443.48 N 70 13 22.098 W 150 49 9.961 7333.43 53.90 220.25 4915.48 4968.18 4540.48 4797.06 4676.02 -2709.34 -3811.12 1.35 5931660.12 398393.24 N 70 13 21.530 W 150 49 11.398 7430.21 54.09 219.67 4972.37 5025.07 4609.31 4875.35 4751.81 -2769.35 -3861.40 0.52 5931600.78 398342.18 N 70 13 20.940 W 150 49 12.857 7523.09 54.51 219.56 5026.57 5079.27 4675.40 4950.77 4824.80 -2827.45 -3909.50 0.46 5931543.31 398293.35 N 70 13 20.368 W 150 49 14.253 7620.06 54.89 219.59 5082.60 5135.30 4744.72 5029.92 4901.44 -2888.45 -3959.92 0.39 5931482.97 398242.14 N 70 13 19.768 W 150 49 15.717 7714.26 55.92 219.69 5136.09 5188.79 4812.68 5107.46 4976.63 -2948.17 -4009.39 1.10 5931423.91 398191.91 N 70 13 19.180 W 150 49 17.152 7808.27 55.54 221.32 5189.03 5241.73 4881.33 5185.15 5052.31 -3007.24 -4059.84 1.49 5931365.50 398140.70 N 70 13 18.599 W 150 49 18.617 7901.61 55.32 222.12 5241.99 5294.69 4949.99 5262.00 5127.58 -3064.60 -4110.99 0.74 5931308.81 398088.82 N 70 13 18.035 W 150 49 20.101 7997.11 56.07 221.30 5295.81 5348.51 5020.46 5340.89 5204.88 -3123.50 -4163.48 1.06 5931250.61 398035.58 N 70 13 17.455 W 150 49 21.625 8092.42 54.77 222.16 5349.91 5402.61 5090.56 5419.36 5281.82 -3182.06 -4215.70 1.55 5931192.73 397982.60 N 70 13 16.879 W 150 49 23.141 8187.56 54.29 222.07 5405.11 5457.81 5160.03 5496.85 5357.94 -3239.54 -4267.67 0.51 5931135.94 397929.90 N 70 13 16.313 W 150 49 24.649 8282.33 54.90 220.58 5460.02 5512.72 5228.79 5574.09 5433.66 -3297.55 -4318.67 1.43 5931078.60 397878.16 N 70 13 15.742 W 150 49 26.129 8377.10 55.54 220.06 5514.08 5566.78 5297.45 5651.93 5509.73 -3356.89 -4369.03 0.81 5931019.91 397827.03 N 70 13 15.159 W 150 49 27.590 8471.25 55.69 220.73 5567.25 5619.95 5366.04 5729.62 5585.74 -3416.07 -4419.38 0.61 5930961.40 397775.92 N 70 13 14.576 W 150 49 29.052 8566.00 55.60 218.88 5620.72 5673.42 5434.70 5807.84 5662.13 -3476.15 -4469.46 1.61 5930901.97 397725.08 N 70 13 13.985 W 150 49 30.505 8657.95 55.80 220.42 5672.54 5725.24 5501.28 5883.80 5736.31 -3534.64 -4517.93 1.40 5930844.13 397675.86 N 70 13 13.410 W 150 49 31 8757.08 55.51 220.30 5728.47 5781.17 5573.51 5965.65 5816.51 -3597.00 -4570.93 0.31 5930782.46 397622.06 N 70 13 12.796 W 150 49 33. 8852.41 54.56 221.60 5783.10 5835.80 5642.82 6043.77 5893.25 -3656.01 -4622.12 1.50 5930724.13 397570.11 N 70 13 12.215 W 150 49 34.935 8946.09 54.37 221.40 5837.55 5890.25 5710.79 6120.00 5968.31 -3713.10 -4672.64 0.27 5930667.70 397518.86 N 70 13 11.653 W 150 49 36.401 9041.60 54.24 222.77 5893.28 5945.98 5780.30 6197.57 6044.83 -3770.67 -4724.62 1.17 5930610.82 397466.14 N 70 13 11.087 W 150 49 37.910 9136.60 53.24 224.47 5949.47 6002.17 5849.83 6274.17 6120.73 -3826.12 -4777.46 1.79 5930556.06 397412.59 N 70 13 10.541 W 150 49 39.443 9232.65 54.16 224.37 6006.33 6059.03 5920.55 6351.58 6197.59 -3881.41 -4831.64 0.96 5930501.48 397357.71 N 70 13 9.997 W 150 49 41.015 9328.19 53.74 222.28 6062.56 6115.26 5990.50 6428.82 6274.10 -3937.60 -4884.64 1.82 5930445.99 397303.99 N 70 13 9.444 W 150 49 42.553 9423.45 53.55 221.76 6119.03 6171.73 6059.21 6505.54 6349.86 -3994.59 -4935.99 0.48 5930389.67 397251.91 N 70 13 8.883 W 150 49 44.043 9518.96 53.95 221.08 6175.50 6228.20 6127.84 6582.56 6425.82 -4052.35 -4986.95 0.71 5930332.59 397200.21 N 70 13 8.315 W 150 49 45.522 9614.65 54.62 219.89 6231.36 6284.06 6196.48 6660.25 6502.25 -4111.44 -5037.38 1.23 5930274.16 397149.02 N 70 13 7.733 W 150 49 46.986 9709.90 55.30 219.08 6286.05 6338.75 6264.73 6738.24 6578.74 -4171.63 -5086.97 1.00 5930214.62 397098.66 N 70 13 7.141 W 150 49 48.424 9805.31 55.69 221.39 6340.10 6392.80 6334.02 6816.86 6656.07 -4231.64 -5137.75 2.04 5930155.28 397047.11 N 70 13 6.551 W 150 49 49.898 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1A\Tofkat 1A Generated 5/1/2008 10:50 AM Page 3 of 4 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS ayvi.4n .7~. OL LLU .aI OJ.7Y. JJ VYY/. VJ VYVY .YV vVaV. G.' v/.'~. .// -+Ga ~ .vv -./~v... . .. 9996. 10 55. 88 221 .04 6447. 61 6500. 31 6473 .75 6974. 47 6811. 50 -4350 .84 -5240. 87 10090. 90 55. 36 221 .42 6501. 14 6553. 84 6543 .35 7052. 71 6888. 78 -4409 .68 -5292. 44 10185. 56 55. 29 221 .74 6555. 00 6607. 70 6612 .81 7130. 56 6965. 75 -4467 .92 -5344. 10 10281. 20 55. 14 220 .76 6609. 56 6662. 26 6682 .69 7209. 11 7043. 38 -4526 .97 -5395. 89 10377. 19 56. 09 220 .14 6663. 77 6716 .47 6752 .65 7288. 32 7121. 50 -4587 .25 -5447. 29 10471. 65 56. 08 220 .30 6716. 48 6769 .18 6821 .73 7366. 71 7198. 79 -4647 .11 -5497. 90 10566. 49 56 .67 219 .31 6769. 00 6821 .70 6891 .06 7445. 68 7276. 57 -4707 .78 -5548. 46 10661. 72 57 .78 219 .98 6820. 55 6873 .25 6961 .24 7525. 75 7355. 43 -4769 .43 -5599. 54 10757. 27 58 .96 218 .89 6870. 66 6923 .36 7032 .40 7607. 11 7435. 52 -4832 .26 -5651. 22 10852. 97 59 .90 219 .50 6919. 33 6972 .03 7104 .31 7689. 50 7516 .62 -4896 .12 -5703. 29 10947. 69 61 .25 219 .67 6965. 86 7018 .56 7176 .58 7772. 00 7597 .93 -4959 .70 -5755. 86 11043. 20 62 .93 219 .63 7010. 57 7063 .27 7250 .56 7856. 40 7681 .16 -5024 .68 -5809. 71 11138. 98 64 .89 219 .07 7052. 69 7105 .39 7325 .74 7942. 42 7765 .94 -5091 .20 -5864. 25 Last Survey 11230.77 66.67 219.94 7090.34 7143.04 7399.01 8026.12 7848.50 -5155.78 -5917.50 TD (Projected) _ 11297.00 66.67 219.94 7116.57 7169.27 7452.47 8086.94 7908.57 -5202.41 -5956.55 Legal Description: Northing (Y) (ftUSI Easting (X) (ftUSI Surface : 661 FSL 1808 FEL S11 T10N R5E UM 5934319.60 402238.80 BHL : 737 FSL 2490 FEL S15 T10N R5E UM ~ 5929195.29. 396215.88 - 0.54 5930037.44 396942.46 N 70 13 5.378 W 150 49 52.890 0.64 5929979.27 396890.14 N 70 13 4.799 W 150 49 54.386 0.29 5929921.72 396837.73 N 70 13 4.225 W 150 49 55.885 0.86 5929863.35 396785.19 N 70 13 3.644 W 150 49 57.387 1.12 5929803.74 396733.02 N 70 13 3.051 W 150 49 58.878 0.14 5929744.55 396681.64 N 70 13 2.462 W 150 50 0.347 1.07 5929684.55 396630.31 N 70 13 1.865 W 150 50 1.813 1.31 5929623.57 396578.43 N 70 13 1.258 W 150 50 3.295 1.57 5929561.42 396525.95 N 70 13 0.640 W 150 50 4.794 1.13 5929498.25 396473.06 N 70 13 0.011 W 150 50 6 1.43 5929435.36 396419.67 N 70 12 59.386 W 150 50 7. 1.76 5929371.08 396364.99 N 70 12 58.746 W 150 50 9.392 2.11 5929305.29 396309.60 N 70 12 58.092 W 150 50 10.974 2.12 5929241.41 396255.52 N 70 12 57.456 W 150 50 12.519 0.00 -, 5929195.29 .396215.88 N 70 12 56.997 W 150 50 13.651 r~ f~ J SurveyEditor Ver SP 2.1 Bld(doc40x_100) Tofkat 1\Tofkat 1\Tofkat 1A\Tofkat 1A Generated 5/1/2008 10:50 AM Page 4 of 4 ~ ~ Brooks Range Petroleum a subsidiary ofAVCG, LLC 510 L Street, Suite 601 "Anchorage, AK 99501 'Phone (907) 339-9965 "Fax (907) 339-9961 Apri122, 2008 Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, AK 99501 Attn. Mr. John Norman, Chair APR 2 5 2008 Alaska oi18 Gas Anchors Cammissio~ RE: Brooks Range Petroleum Corp. Tofkat #lA and #1B Data: Final LWD Well Logs and CDs Logs for MWD/LWD/SonicVISION CD for MWD/LWD digital data CD for SonicVISION digital data Dear Mr. John Norman: Brooks Range Petroleum Corporation hereby transmits the Final LWD Well Log data for Tofkat # 1 A and Tofkat # 1 B. Please sign in the space provided and return one copy of this transmittal letter. If you have any questions or require additional information, please contact me at 907- 339-9965. Sincerely, ------ i~~ t~ ` mes R. Wine a er Vice President Land Brooks Range Petroleum Corp. Cc: Doug Hastings Received this ~~ day o~ April, ,y2008. By: ~~ ~,"Y"~, ~ t Company: r__~ ~~ ~ ~--- Name: . ~ Page 1 of 1 Maunder, Thomas E (DOA) From: Bill Penrose [bill@fairweather.comj Sent: Monday, March 31, 2008 8:19 AM To: Maunder, Thomas E (DOA) Subject: RE: Weekly Ops Reports: Brooks Range North Shore #1 and Tofkat #1A Tom, "-~~ ZS Hard cement was tagged four hours after the last day reported for Tofkat #1A. We switched wells at the completion of the last plug because any actions after that point are dictated by the drilling of the next well. Regards, ~~ ~~dar Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E (DOA) [maiito:tom.maunder@alaska.gov] Sent: Monday, March 31, 2008 8:12 AM To: Bill Penrose Subject: RE: Weekly Ops Reports: Brooks Range North Shore #1 and Tofkat #lA Bill, How many additional days did the tagging take? In the convention we use, Tofkat #1 B doesn't begin until you kickoff. Tom From: Bill Penrose [mailto:bill@fairweather.com] Sent: Sunday, March 30, 2008 7:54 AM To: Maunder, Thomas E (DOA) Cc: ]im Winegarner Subject: Weekly Ops Reports: Brooks Range North Shore #1 and Tofkat #1A Tom, Attached here are the weekly operations reports for Brooks Range Petroleum's North Shore #1 and Tofkat #1A. Regards, t'~c~ ~e~rnode Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 3/31/2008 i ~ Brooks Range_ Petroleum a subsrd~ary of AVCG, LLC 510 L Stn3et, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 29, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #lA (PTD # 208-028) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on Tofkat #lA for the period March 21 through March 28, 2008, inclusive. March 21, 2048 4,732' MW 9.9 ppg Vis 179 sec Inc157.83 deg POH w/ cmtg string, L/D tools. M/U directional drlg BHA, RIH to 3,398'. Cic while WOC. RIH to 3,589', wash to 3,970'. Tag cmt at 3,970', wt test w/ 20K lbs. Orient drlg tools, work back and forth btwn 3,940' and 3,970' to trench side of hole for kickoff. Control dri113,970' to 4,025'. Directionally drill 8-1/2" hole 4,025' to 4,732'. March 22, 2008 6,067' MW 10.1 ppg Vis 179 sec Incl 53.80 deg C&C mud, POH to KOP and work BHA through it. RIH, dri114,732' to 5,780'. Make wiper trip to 5,494' -hole in good condition. Dri115,784' to 6,067'. March 23, 2008 7,715' MW 10.0 ppg Vis 130 sec Incl 55.92 deg Directionally drill 8-1/2" hole 6,067' to 6,732'. CBU, make wiper trip to 4,700' and back to btm -hole in good condition. Dri116,732' to 7,715' . March 24, 2008 9,366' MW 10.0 ppg Vis 130 sec Inc153.70 deg Make short wiper trip 7,778' to 7,497' -hole in good condition. Directionally drill 8- 1/2" hole 7,778' to 8,726'. Make long wiper trip 8,726' to 6,454'. Pull 30K# over - work until cleaned up. RIH to btrn, dri118,726' to 9,366'. • March 25, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg Directionally drill 8-1/2" hole 9,366' to 11,297'. Pump slug and POH. March 26, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg POH, L/D BHA. Test BOPE. M/U mule shoe on drill pipe, RIH for mud change-out. March 27, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg Continue RIH to TD. C&C mud while waiting for delivery of WBM system. Displace OBM from hole w/ WBM. POH to csg shoe, clean contaminated mud from flowline and pump suctions. March 28, 2008 11,297' MW 10.0 ppg Vis 85 sec Inc166.67 deg Finish cleaning pump suctions, POH. P!U 2-7/8" cementing stinger on DP, RIH to 4,760'. Spot 25 bbls hi-vis 15.8 ppg pill. Pull up to 4,400', R/U to cement. Spot balanced plug of S2 bbls Class G cement at 15.8 ppg. Pull up 10 stands. First 6 stands pulled dry, last 4 stands pulled wet. Attempt to pump through DP w/ no success. POH wet - 9 jts DP and all 21 jts 2-7/8" stinger plugged w. cmt. M/U cleanout assy to check for top of cmt plug. FINAL REPORT (Subsequent operations attributed to Toflcat #1B.) If you have any questions or require additional information, please contact me at 258- 3446. Sincerely, For BROOKS RANGE PETROLEUM CORPORATION $'i~ ~eornade Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 2 ~~~' ~ kd . ~~~ ~ ~~ b ~d ~ g~ ALASS-A OII. AHD GAS COHSERQA7`I01~1T CODi2~'II5SIOIIT Bart Armfield VP, Operations' Brooks Range Petroleum Corporation 510 L Street, Suite 601 Anchorage, AK 99501 Re: Exploration Well, Tofkat # lA Sundry Number: 308-097 Dear Mr. Wield: • SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager. Due to travel logistics, 48 hour notice should be given. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this day of March, 2008 Encl. . ~~TAT OF ALASKA • R~CIV~ ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 2 6 20Q$ APPLICATION FOR SUNDRY APPROVALS ~ 20 AAC 25280 A9~_I__ ~ 1. Type of Request: Abandon ^~ Suspend ^ Operational shutdown ^ Perforate ^ giver ' Alter casing ^ Repair well ^ Plug Perforations ^ Stimulate ^ Time Extension Change approved program ^ Pull Tubing ^ Perforate New Pool ^ Re-enter Suspended Well ^ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Num be~ ~c -" Brooks Range Petroleum Corporation Development ^ Exploratory ^ ~ ~ 3. Address: Stratigraphic ^ Service ^ 6. API Number: ?, 510 L Street, Suit 601, Anchorage, AK, 99501 50-029-23381-01 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: ~ ~~~ Spacing Exception Required? Yes ^ No 0 ~ Tofkat #1 ~~~ 9. Property Designation: ~~~ ~,-~ ~, 10. KB Elevation (ft): 11. Field/Pool(s): ADL'394Q13 ~ 32.5 Exploratory 12. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 13,174' 7,703' 1 3,174' 7,703' None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 16" 113' 113' N/A N/A Surface 3,865' 9-5/8" 3,898' 3,009' 5,750 psi 3,090 psi Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): N/A N/A N/A N/A N/A Packers and SSSV Type: Packers and SSSV MD (ft): N/A N/A 13. Attachments: Description Summary of Proposal ^ 14. Well Class after proposed work: Detailed Operations Program ^~ BOP Sketch ^ Exploratory Q Development ^ Service ^ 15. Estimated Date for 12-Mar-08 16. Well Status after proposed work: Commencing Operations: Oil ^ Gas ^ Plugged^ Abandoned ^~ 17. Verbal Approval: Date: WAG ^ GINJ ^ WINJ ^ WDSPL ^ Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Bill Penrose 258-3446 Printe a Bart Armfield Title ~3 z(p D O Vice President, Operations Signature Phone Date 865-5840 COMMISSION USE ONLY ~j witness Sundry Number~~ ~O 1 resentative ma Commission so that a re l Notif diti f C p approva : y on ons o y Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^ Other: Subsequent Form Required: ~~~ \, APPROVED BY ~ Approved by: N p COMMISSIONER THE COMMISSION Date: l~o ~~ r 0-4f ~ '~~ V / ~ 1... ~~~Q~Bubmit in Duplicate ,/" ~ • Brooks Range Petroleum Corporation Tofkat #1 A Wellbore Schematic PROPOSED P&A 12-1 /4" hole 10.0 ppg mud 16" conductor at 110' TOC at 3,800' MD ~ s ~' ,..~;~~' ~ 9-5/8" casing at 3,898'MD BOC at 4,400' MD 8-1/2" hole 10.0 ppg mud TD at 7,169' TVD, 11,300'MD Wlp 3/26/08 • • Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation Tofkat #lA Cement .Plug Procedure General /i,~ There are no hydrocarbon-bearing zones required by the AOGCC to be covered with /~~`` cement during abandonment of the open hole. The extent of the abandonment of this well in preparation for sidetracking it with Tofkat #1B will be by setting a cement plug ~ ~~-$ across the 9-5/8" casing shoe at 3,898' MD. The abandonment/kickoffplug will be set across the interval 3,800' - 4,400' MD. Cement plugging of the hydrocarbon-bearing zones will be achieved by setting isolation cement plugs as follow. Also, a densified cement plug will be placed across the 9-5/8" casing shoe for kicking off the Tofkat #lA sidetrack. The open hole cement volume will include 30% excess. Casing Shoe Plug 1. RIH with open-hole bridge plug on drill pipe to 4,400'. Set and weight-test bridge plug and unlatch from it. 2. With the bridge plug running tool located just above the bridge plug, place a balanced cement plug across the casing shoe (100' inside 9-5/8" surface casing shoe to 500' below shoe in 8-1/2" open hole) as follows: Pump 15 bbls Alpha Spacer with 1 gaUbbl surfactant 434B at same weight as mud. Follow with 53.2 bbls. (302 sx) Premium Cement+ .8% CFR-3 (Dispersant), + 0.3% Halad-344 (Fluid Loss Additive), + HR-5 (Retarder) if required. Follow with 15 bbls Alpha Spacer with 1 gal/bbl surfactant 434B at same weight as mud. 3. POH ten stands, CBU and POH 4. P/U clean-out BHA and RIH to the casing shoe. WOC until a total of eight hours has elapsed since setting the cement plug. 5. RIH, tag cement and dress off plug. When it is firm enough to take a drilling weight (1 OK - 20K lbs), drill the cement to 3,925' (27' outside the casing shoe). 6. POH to pick up directional drilling assembly for drilling the Tofkat #1~ ~ ~TL.-~~ sidetrack. ~~ ~ ~ c~2w Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, March 26, 2008 2:04 PM To: 'Bill Penrose' Cc: 'Bart Armfield ;Doug Hastings; 'Stephen F Davies' Subject: Tofkat #1A (208-028) Bill, Thanks for bringing over the logs. After examination by myself and Steve Davies, we concur with Mr. Hastings that there are no zones of interest in this wellbore. As such, the only plug necessary will be that at the surface casing shoe. It is understood that the likely intent is to re-drill a new penetration, Tofkat #1 B. We look forward to the sundry to P&A the 1A wellbore and the permit to drill for 1 B. Call or message with any questions. Tom Maunder, PE AOGCC 3/26/2008 Brooks Range Petroleum. a subsidiary of A VCG, LLC 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 26, 2008 Mr. Dan Seamount, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage, Alaska 99501 RECEIVE® MAR 2 6 2008 Alaska 0~ 8~ Gas Cons. Commission Anchorage RE: Sundry Application to Plug and Abandon Brooks Range Petroleum Corp. Tofkat #lA (PTD # 207-173) Dear Mr. Seamount, Brooks Range Petroleum Corporation proposes to plug and abandon the open-hole portion of its Tofkat #lA well. It is intended to plug the well back to the shoe of the surface casing then sidetrack the well to a new bottomhole location. The Application for Permit to Drill Tofkat #1B will be submitted under separate cover. One cement plug is planned, across the surface casing shoe, is planned as indicated on the enclosed wellbore schematic. The wireline and mud logs from this well have been reviewed with AOGCC staff for their concurrence on the cemented interval and our plan to abandon them. The abandonment of Tofkat #lA will be accomplished as indicated on the attached wellbore diagram and P&A procedure. If you have any questions or require .additional information, please contact me at 339- 9965 or Bill Penrose at 258-3446. Sincerely, LEUM CORPORATION Bart Armfield Vice President, Operations attachments ORIGINAL cc: Bill Penrose • Brooks Range Petroleum a subsidiary of A VCG, LLC 510 L Street, Suite 601 * Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 March 21, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission. 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Weekly Report of Operations Brooks Range Petroleum Corp.: Tofkat #lA (PTD # 208-028) Dear Mr. Norman, This is a report of Brooks Range Petroleum Corporation's well operations on Toflcat #lA for the period March 19 through March 20, 2008, inclusive. March 19, 2008 3,898' MW 10.0 ppg Vis 156 sec Inc160.00 deg Finish POH w/ cmtg stinger. Test BOPE, witnessed by AOGCC rep. M/U directional drilling assy, RIH. March 20, 2008 3,898' MW 10.1 ppg Vis 265 sec Incl 60.00 deg RIH to 1,120, shallow test tools. RIH to 3,684', wash to 3,860'. RIH to 4,447' - no cement. C&C, POH, SB BHA. P/U 499' of 2-7/8" cmtg stinger, RIH w/ it on DP to 4,587. Spot 26 bbls 15.8 ppg viscous pill. Pull up to 4,302', pump 15 bbls 10 ppg spacer, 27 bbls 15.8 ppg cement, 5 bbls 10 ppg spacer, displace w/ mud. CIP at 2200 hrs. CBU, POH. If you have any questions or require additional information, please contact me at 25$- 3446. ~ r Sincerely, For BROOKS RANGE PETROLEUM CORPORATION Bill Penrose Vice President /Drilling Manager Fairweather E&P Services, Inc. cc: Jim Winegarner -Brooks Range 1 arc i r • Maunder, Thomas E (DOA) From: Bill Penrose [bill@fairweather.com] Sent: Friday, March 21, 2008 8:33 AM To: Maunder, Thomas E (DOA) Subject: RE: Weekly Drilling Ops Report -Brooks Range Petroleum Tofkat #1 and Tofkat #1A Tom, ~`Z -~~ ~ ~ OAS ~"O ~~ After going through a lot of this in this well, I'm starting to get a feel for what's going on. It doesn't appear to be a contamination issue with the OBM, rather the hole geometry. The hole angle is 60 degrees and we're seeing indications that the viscous pills and then cement plugs are slipping down the low side of the hole, swapping places. In particular, the viscous pills, being the same weight as the rest of the mud system is swapping with the cement, the cement going down the low side and the pill slipping up the high side, before the cement has time to set. In the plug we're trying right now (surface casing shoe), we've added calcium chloride to the cement as an accelerator and made our underlying viscous pill the same weight as the cement. In my mind, the mud downhole will be working at swapping with the viscous pill while the cement sets. I have high hopes for this method -we'll know when we try to tag the plug later today. Regards, ~G~P ~~dC Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, March 21, 2008 8:14 AM To: Bill Penrose Cc: Jim Winegarner Subject: RE: Weekly Drilling Ops Report -Brooks Range Petroleum Tofkat #1 and Tofkat #lA Bill, Thanks for the reports. Interesting that three of the plugs did not set. Don't remember seeing that before, but it may point to incompatibilities with the OBM. I am glad that tagging was your original proposal and it was not changed. This is a lesson learned for future OBM plugging. Sorry you all had to be the data point. Best regards, Tom Maunder, PE AOGCC From: Bill Penrose [mailto:bill@fairweather.com] Sent: Friday, March 21, 2008 7:40 AM To: Maunder, Thomas E (DOA) Cc: ]im Winegarner Subject: Weekly Drilling Ops Report -Brooks Range Petroleum Tofkat #1 and Tofkat #1A Tom, 3/24/2008 Please find attached the weekly operations reports for the subject wells. Regards, ~8~4.e Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 3/24!2008 ~~ .~ ~ - ..~ ~„~ ,., ~ SARAH PAL/N, GOVERNOR ~+ t~~ ~~ t~~L ~ 333 W. 7th AVENUE, SUITE 100 C0~-7~A~~~01s CtOr~{'IIss'I0~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 James R. Winegarner VP, Land and External Affairs Brooks Range Petroleum Corporation 510 L Street, Suite 601 Anchorage, AK 99501 Re: Exploration Well, Tofkat No. lA Brooks Range Petroleum Corporation Permit No: 208-028 Surface Location: 661' FSL, 1808' FEL SEC.11 T10N, R5E, UM Bottomhole Location: 4997' FSL, 3397' FEL, SEC. 22, T10N, R5E, UM Dear Mr. Winegarner: Enclosed is the approved application for permit to redrill the above referenced exploration well. Form 10-403 must be submitted for the necessary plugging operation for Toikat No. 1 (207-173). It is understood, that this redrill is dependent on the outcome of Tofkat No. 1. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Cuttings samples are not required if samples were obtained in the Tofkat # 1. A mudlog is required for the redrill section. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals below conductor pipe and 10' sample intervals through target zones. At a minimum, openhole gamma ray, resistivity, and sonic or density porosity logs must be recorded from the base of surface casing to total depth of the Brooks Range Petroleum Corp. Tofkat #lA Permit: 208-028 redrill. If formation testing is planned, a Sundry Notice (Form 403) must be submitted in advance of the operations. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ ~ day of March, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~~~~~ STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COM I~N FE.~ I. ~ 2008 PERMIT TO DRILL (+J~1 ,~r,g g, ~ ,;~, ° 1 ~~ NI~~WR~ ~l~ ~. °~"»r r .r, r. ro .T~....i 20 AAC 25.005 1a. Type of Work;l~• 1b. Current Well Class: Exploratory Q - Development Oil ^ 1c. Specify if well is propos '~f'faY. `"_`' Drill /d'~~ drill Stratigraphic Test ^ Service ^ Development Gas ^ Coalbed Methane ^ Gas Hydrates ^ e-entry Multiple Zone ~ - Single Zone ^ Shale Gas ^ 2. Operator Name yy ' 5. Bond: Blanket Q Single Well ^ 11. Well Name and Number: Brooks Range Petroleum Corporation Bond No. LPM 8842179 ~ Tofkat #1A 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 510 L Street, Suit 601, Anchorage, AK, 99501 MD: 12,999' TVD: 8,200' 4a. Location of Well (Governmental Section): 7. Property Designation: Exploratory Surface: 661'FSL 1808' FEL S11 T10N-R5E ~ Top Productive Horizon: ADL-390676 ' Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 988' FNL 2282' FEL S15 T10N-R5E N/A 3/1 512 0 0 8 Total Depth: 9. Acres in Property: 14. Distance to Nearest ' 4997 FSL 339T FEL S22 T10N-R5E ~ y,y~.o5 °v' 1920 acres Property: 8,278 4b. Location of Well (State Base Plane Coordinates): (,ASP N27 '~ ~ o 10. KB Elevation ,5p.7 Iji!3L t 1's~• 5 f 32 15. Distance to Nearest Well 1 miles - ~ 4 3 i4 Surface: x-4 ~(oZ239y 5,9 S'y3 ee . (Height aboveGL): . . 16. Deviated wells: .ti•?.~' Kickoff depth feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: ~ .O6 degrees Downhole: 7029 psi -~ ~ Surface: 3,447 psi 18. Casing Program: Specif ations Top -Setting Depth -Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) g_1/2~~ 7" 26# L-80 BTC 12,999 0 0 12,999 8,200' 1189 cu ft + 30% excess 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry O perations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13,630 8200' 3685 2800 Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 16" grouted to surface 80 80 Surface 3879' 9-5/8" 1800 cu ft 3879' 3000 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Attachments: Filing Fee ^ BOP Sketch Q Drilling Program Q Time v. Depth Plot Q Shallow Hazard Analysis 0 20 . Property Plat ^ Diverter Sketch Q Seabed Report ^ Drilling Fluid Program Q 20 AAC 25.050 requirements ^ 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact R. Winegarner ames Printed Name J Title VP, Land and External Affairs ~~ ~~ /~- t/ Phone 865-5804 Date -? ~7 ~~j Signature ~%l Commission Use Only Permit to Drill Q ~ ~d~ AP umber: _ l~~ Z~~67~ 0~ Permit Approval ~ g~ Date: ~~ `~ t~ See cover letter for other requirements. O Number. 50- Condition of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Samples req'd: Yes^ No[V]/ Mud log req'd: Yes[/ No^ Other: ~j ,, c ~,,_^ ~S l ~~ C ~C`~ p ~ `~~ H2S measures: Yes^ No [r Directional svy req'd: Yes No^ ~~~ ~~~ w~ ~ ~~ ~ Oss-~(~ ~~ «h-iR13~ ~LC~SS~~ , ~ e APPROVED BY THE COMMISSION 3 ~~ DATE: ,COMMISSIONER ~ ~~u5tnit in Duplicate Form 10-401 Revised 12/2005 • • Brooks Range Petroleum a subsidiary ofAVCG, LLC 510 L Street, Suite 601 "Anchorage, AK 99501 * Phone (907) 339-9965 * Fax (907) 339-9961 February 14, 2008 Mr. John Norman, Chair Alaska Oil and Gas Conservation Commission 333 West 7~' Ave., Suite 100 Anchorage, Alaska 99501 RE: Application for Permit to Drill: Tofkat #lA ~~, Alaska ail has ~~~~. Cosal~si4n ~n~h~raga Dear Mr. Norman, C~c~i ~r Brooks Range Petroleum hereby applies for a Permit to Drill a si c oil exploration well from an ice pad located approximately six miles east of the village of Nuiqsut on the North Slope. Brooks Range plans to use Nabors Rig #27-E to sidetrack its Tofkat #1 well to delineate its discovery i_f that well proves successful. If Tofkat #1 proves to be unsuccessful in finding encouraging amounts of hydrocarbons, the rig will be moved to Gwydyr Bay area to drill Brooks Range's North Shore #3 well. The application for Permit to Drill the North Shore #3 is being submitted under separate cover. Our anticipated date for commencing drilling the Tofl~at #lA is March 15. The Tofkat #lA well will consist of a sidetrack of the Tofkat #1 wellbore with the kickoff point located at the shoe of the surface casing in the original wellbore. A simple build and hold 8-1/2" hole will be drilled to a bottomhole location near the edge of the presumed hydrocarbon accumulation and the sidetrack wellbore cased with 7" production casing. The well will be production tested after the rig has moved off the pad and then will be operationally shut down until pe~~ `ent,~roduction facilities are installed. ~ ~ S~ ~~ wc~,~, ~ s co Mss ~z~~~~ c~~ ~ ~~~ ~~s ~ ~ ~ ~ ~ ~~aP~c~- Please find attached information as required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1) Form 10-401 Application for Permit to Drill 2) A plat showing the surface location of the well 3) Proposed drilling program 4) Drilling Time versus Depth Plot 5) Proposed Toflcat #lA Wellbore Diagram 6) Pressure Calculations, Drilling Area Risks and Waste Disposal 7) Casing Properties and Design Factors 8) Diagrams and Descriptions of the BOP Equipment to be Used ORIGINAL / ~'~ /r 9) Directiona)~lling Program 10) Drilling Fluid Program 11) Cementing Program 12) Brooks Range does not anticipate the presence of H2S in the formation to be encountered in this well. However, H2S monitoring equipment will be functioning on the rig at all times during drilling and completion operations. 13) The following are Brooks Range's designated contacts for reporting responsibilities to the Commission: 1) Completion Report (20 AAC 25.070) Bill Penrose, Drilling Manager (907) 258-3446 2) Geologic Data and Logs (20 AAC 25.071) Doug Hastings, VP -Exploration (907) 865-5802 If you have any questions or require additional information, please contact me at (907) 865-5840 or Bill Penrose at (907) 258-3446. Sincerely, BROOKS RANGE PETROLEUM CORPORATION /~ ~~.--- Armfield /Cdic- ice Presiden -Operations enclosures cc: Bill Penrose -Fairweather 2 ADMIRALTY BAY BEAUFORT SEA SMITH BAY TOFKAT 1 c~. ~, Teshekpuk HABRAIYON vA ~ , Lake $. d Y a Creek ALPINE ,~ Y Y ~ NUIOSUT o aS v Vicinity Map NOT TO SCALE ~` ~. ~. N SCALE: 1" = 200' M v m 0 0 ~.i 0 c7 z v 0 J I (L I 0 z z 0 Q U 0 a NOTES: 1. COORDINATES SHOWN HEREON, BASED UPON GPS OBSERVATIONS (SUMMER 2007). 2. COORDINATES ARE NAD83, ALASKA STATE PLANE ZONE 4. 3. VERTICAL DATUM: MSL (GEOID 2006, ALASKA). 4. ALL DISTANCES AND ELEVATIONS ARE IN SURVEY FEET. 5. DATE OF SURVEY 09-12-07, 01/09/08. 6. SECTION LINES SHOWN HEREON ARE APPROXIMATE AND FOR REFERENCE ONLY. od v 990' (TO EXIST. PIPELINE) ALPINE RE-SUPPLY ICE ROAD ~-- o- R o, 00 00.E ~ P p,0 '3 0 ~G ~ 6 5000 ,~ G~F'a~0 245 165' ~ ~ OF ~ ob ~ ~% TOFKAT 1 d ~J ~p 200' / O~ ~ 661 f' Po N, ~~F, P F soo 00 ~ GE O .oo 0o O KUUKPIK LCMF~ 7~SB E.6~7dreA • Mdi°rep°, Alad~ 89808 •11807)478&90 Alpine Survey Office T 10 N, R 5 E, UM SECTION 11 T 10 N, R 5 E, UM SECTION 14 TOFKAT 1 LOCATED WITHIN PROTRACTED SECTION 11, T.10 N., R.5 E. UMIAT MERIDIAN, ALASKA 661' FSL 1808' FEL ~ ~ N ~ o NAD83 Datum N 70°13'47.013" ~ N W 150°47'31.893" ~ ~ ASPC ZN4 ~ ~ N 5,934,067.69 `'' "' E 1,542,273.374 ~ ~ z z 0 0 ~ 1808' ~ ~ BROOKS RANGE PETROLEUM PROPOSED LOCATION TOFKAT #1 WELL ALPINE, ALASKA DATE: 1/9/2008 DRAWN BY: AG SHEET: 1 ~F 1 SCALE: 1" = 200' CHECKED BY: KP W.O. No: 07-217 Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation Tofkat #lA Summary Drilling Procedure 1. RIH, tag and weight test cement plug at 9-5/8" shoe with 5,000 lbs. 2. Notify AOGCC 24 hours ahead of planned spud as required. 3. M/U 8-1/2" cleanout assembly and RIH. Drill out cement (top of cement is ~~~Gb~~ s~~ expected 3685' MD) to 4,445' MD and POOH. M/U 8-1/2" PDC bit, PDM and MWD/LWD tools and RIH. Kick off well and directionally drill to 12,999' MD ~' ~~ ~l''~ (8200 TVD). 4. If shows are encountered in target intervals, a decision maybe made to POOH and run conventional core barrel. Depending on days since last BOP test, BOP test maybe required. (BOP tests required every 7 days). 5. At TD, wireline logs will be run. 6. If decision is made to P&A, proceed with abandonment as per AOGCC regulations. A detailed plugging procedure will be prepared and approval obtained from AOGCC. 7. If the decision is made to run 7" casing, RIH with bit and one stand of drill collars to TD and circulate and condition mud prior to POOH and running casing. 8. POOH and L/D 4" DP. Rig up and run 7" casing. 9. Cement 7" casing as per cement program. Top of cement to be determined based on open hole logs. 10. Test 7" casing to 3500 psi. 11. Complete well with 3-1/2" crude oil testing string. 12. N/D BOPE, N/U tree and test same to 5,000 psi. 13. RDMO drilling rig prior to MIRU testing equipment. Tofkat #1 A ~ WOCIPerform plug integrity test 0 1000 2000 3000 4000 5000 6000 w ~ 7000 0 8000 9000 10000 11000 12000 13000 14000 Drill 8-1/2" hole Logging/Run cement 7"CSG 0 1 2 3 4 5 6 7 8 9 10 11 Days 12 13 14 15 16 17 18 19 20 Brooks Range Petroleum Corporation 8-1/2" hole U. Kuparuk perf's at 7,020' TVD Alpine C perf's at 8,050' TVD 7" casing at 8,200' TVD, 12,999'MD TOFKAT #1 A Well Schematic • 16" conductor at 100' ~fkat #1 9-5/8" casing 3,000'TVD, 3,879'MD ' 8-1/2" hole -fkat #1 TD at 7,500' /D, 11,565'MD WJP 02/13/08 Brooks Range Petroleum Corporation Totkat #lA Formation Evaluation Program Electric Logging Prog am Hole Section Section Length MWD LWD OH Wireline CH Wireline 8-1/2" 8,999' Yes Gr/Res/Neut/Dens MDT CBIL Mud Logiging Program Contractor: Sperry Log interval: From base of surface casing to TD Service: r 4 surface loggers of which two are supervisory/senior alternately on duty Equipment/Sensors 1. Gas Detector 2. Degasser 3. Stand Pipe Pressure 4. Pump Stroke 5. Hook Load 6. Mud Pit Level 7. Hook Movements Cutting Sampling Interval = 30' and every 10' in all zones of interest ~ Brooks Range Petroleum Corporation 0 1,000 2,000 3,000 $ 4,000 t a m ~ 5,000 m m ~ 6,000 7,000 8,000 9,000 J 10,000 8 10 12 14 16 18 Mud Wt. in ppg • Tofkat #1 A Geo-mechanical Plot 16" I P r mafro t 7 _:__ _ _Min ___ r~ra i s _ _ -- _ . _ __ _ _ __ _ . _ . __ _ . _ _ ___ ___ __ ___~ __ ~ nea sur~,c T ay Frac G ad. stic ing to it ~ and BHA ~ _ est S k S ale W II (K-5) - - _ - N nud We~ ght- - - - ( ore Pa ss. + tilling M largin) opset --- ---- -- --~ _ -._- --- --- -~1 ~._. ._._._. _._ ___ __ __ _ O cassio alt~h -_ ___ _t __ _.__ ho e, ledg sand pa king o Ku aruk --- -- -- --- --- --- --- --- --7 „ __ _Alp ineC WJP 02-13-08 ~ ~ Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation Pressure Calculations, Drilling Area Risks and Waste Disposal Tofkat #lA Maximum Anticipated Surface Pressure: 8-1/2"" Hole Section The maximum anticipated pressure (MASP) for the 8-1/2" hole section in this sidetrack will be the formation pore pressure (less a full gas column to the surface) at 12,999' MD/ 8200' TVD. Offsetting well information indicates that pore pressure at TVD will be a maximum of 10.2ppg (or 0.5304 psi/ft). Calculations: 8-1/2" hole section MASP (pore pressure) _ (8200 ft) (0.5304-0.11) = 3447 psi i With MASP in the 8-1/2" open hole section is expected to be 3447 psi and the 5,000 psi BOPE system to be used will be adequate. Well Proximity Risks: The closest wellbore to this one is Oberon #llocated approximately 4.1 miles away so there is no anticipated interference expected between wellbores. Drilling Area Risks: 1. There is a remote possibility of encountering gas hydrates. If hydrates do occur, they will be treated handled by slowing down ROP, increasing mud weight and making slower bit trips. 2. There is little risk of H2S in the area, as none of the offsetting wells encountered any. However, as a precaution, the rig and mud logging units will have functioning H2S detectors. • ~ Disposal of Muds and Cuttings: All drill cuttings and waste drilling fluids will be disposed off in BP's grind and inject facility at Prudhoe Bay or in approved Class II disposal wells in Kuparuk Field. • Brooks Range Petroleum Corporation Tofkat No. lA CSG Design Safety Factors Burst Requirements for 9-5/8", 40 #, L-80, BTC surface casing: Max. Pressure @ surface ={(10.2 ppg x 0.052)-0.11)} x 8200' = 3447 psi DFb =burst strength /burst stress = 5,750 psi / 3447psi =1.6 Burst Requirements for 7", 26 #, L-80, BTC production casing: Maximum pressure @ surface ={(10.2 ppg x 0.052)-0.11)} x 8200' = 3,447 psi DFb =burst strength /burst stress = 7,240 psi / 3447 psi = 2.1 The whole casing string must be capable of withstanding this internal pressure without failing in burst. Collapse Requirements for 9-5/8", 40 #, L-80, BTC surface casing Design criteria are based on a 9.6 ppg EMW pore pressure external to the casing at the shoe and a gas gradient inside the casing: External pore pressure = 9.6 x 0.052 x 3,000' =1,498 psi Internal pressure w/gas only = 0.11 x 3,000' = 330 psi Collapse stress = 1,498 psi - 330 psi =1168 psi DFc =collapse rating /collapse stress = 3,090 / 1168 = 2.6 Collapse Requirements for 7", 26#, L-80, Production casing External max pore pressure = 10.2 x 0.052 x 8200' = 4,349 psi Internal pressure w/gas only = 0.11 x 8,200' = 902 psi Collapse stress = 4349 psi - 902 psi = 3447 psi DFc =collapse rating /collapse stress = 5410 / 3447 =1.5 Tension Check for 9-5/8", 40 #, L-80, surface casing: Wt in air = 3879' x 401b/ft = 155,160 # Pipe weight in fluid = 153,400# x 0.8533 (buoyancy factor) =132398 # DFt =joint tensile strength /buoyed wt = 916,000 / 132398 = 6.9 • Brooks Range Petroleum Corporation Tofkat No. lA CSG 1Tesign Safety Factors Tension Check for 7", 26#, L-80, production casing Wt in air = 12999' x 261b/ft Pipe weight in fluid = 326482# x 0.8411(buoyancy factor) = 337974 # = 284270 # DFt =joint tensile strength /buoyed wt = 604,000 / 284270 = 2.1 Brooks Range Petroleum Corporation Tofkat #1 A Casina Properties and Desian Verification Casing Performance Prpoerties Internal Collapse Tensile Strenght Design Safety Factor* Size Weight Grade Cnxn Yield Ressistanc Joint Body TVD MD T B (in) (Ib/ft) (psi) (psi) (1000 Ibs) (ft RKB) (ft RKB) 9-5/8" 40# L-80 BTC-M 5750 3090 916 3000 3879 6.9 1.6 7" 26# L-80 BTC-M 7240 5410 604 8200 12999 2.1 2.1 * Tensile design safety factors are calculated using pipe weight less buoyancy. Burst design safety factors are calculated at the surface using zero backup on the outside and MASP on the inside. Collapse design safety factors are calculated at the casing shoe using maximum expected mud weight to be used at the shoe depth on the outside and the entire cased hole evacuated except a gas gradient on the inside. Casing Setting Depth Rationale 9-5/8" 3,879' MD/ 3,000' TVD 7" 12,999' MD/ 8,200' TVD C 2.6 1.5 Surface casing to stablize shallow formations, provide an anchor for the BOP stack and provide shoe strength in the event of kick Production casing set through the productive interval. \~ i 13 5/B' S000~' HYDRIL ANNULAR BOP A' S)/B• I I y/a• _ -_-_-_-_-_- _-_-_-_-__ BOLTED FIANCE Y 6 1/e' I SINGLE 13 5/B' S000~ HYORIL MPL PIPE RAM I y/e'~_ -_-_-_-_-_- _-_-_-____ BOLTED FLANGE 2' a 1/8' I SINGLE 13 5/B' S000~ HYDRIL MPL BLIND RAM ' I 3ro' - 5000E GATE VALVE 3 - ~ ~-- BOLTED FLANGE 4' SOOOe HCR VALVE 3' 5000/ HCR VALVE ~ 1' to 5/B' ~ --~-- IH-~ 4' CHOKE LINE y~• _ -- \ 1 -_-_-_- ~ ' ' A' 5000/ GATE VALVE BOLTED FLANGE 2' K 1LL LINE 3 x2 I y i SINGLE 13 S/B' 5000/ HYDRIL MPL PIPE RNA Y s f/B' y/B• _-_-_-_-_- _-___-_-_- 80lTED FW1GE o' 10 7/ B• \ ~~ ~~ _ HUD x FLANGE -21 1/4' 2000/ HYDRIL BOP/DIVERTER FLG SURFACE DIVERTER PIPING CONFIGURATION PLAN VIEW ;ATE :TUATDR A, IJ~YiOLlsl~tw SURFACE DIVERTER CONFIGURATION H:VLCADFILE\27E\BOP\27E0301C.DWG, 12/07101 01:02:51 PM aaxcEO cww coNNeclaN ro BoLreo n.NeE REV6Ep DI+FRIEEt /3 PER DCN /3 Lb1ERAL 64UE GENERAL 145UE BOP STACK AND SURFACE DIVERTER BOP STACK ELEVATION Material List T~Item Description A 3-1116" 1fl,QQfl# Remote Hydraulic =;, Operated Choke B,C 3-1115" ifl,DOfl# Ad'ustable Choke 2,3,5,6 4-1115" 1fl.Oflfl# ~llanual Gate Valve 1,4,7-15 3-1115" 1fl,Oflfl# Manual Gate Valve' * ~,,. 16 2-1'16" 1©.0©Orr P.4anufil Gate Valve' ~~~,. ~~ Legend `:;. White Handle Valves : '' Normally Open Red Handle Valves Normally Clased Date; 6-8-Ofl Rev. 2 1..+~. ti~,, ~ ~ ., ~~ Rrnnkc Ranna Petroleum Corporation Schlumber~er Tofkat 1A (P5) Proposal Report Date: January 16, 2008 Survey 1 DLS Computation Method: Minimum Curvature 1 Lubinski ° Client: Brooks Range PeVOleum Vertical Section Azimuth: 227.810 Field: North Slope Brooks Range an ' V 0.000 ft Structure 1 Slot: Tofkat 1 /Tofkat 1 ~ te Datum: TVD Refe ;Ona Rotary Table Well: h l i~~ Tofkat 1 s;bi' I~ t 1A ~ea T fk TVD Reference Elevation: Sea Bed 1 Ground Level Elevation: 50.70 ft relative to MSL / 18.20 ft relative to MSL / e: Bore o UWI/API#: a o 50 Magnetic Declination: 22.298° Survey Name /Date: Tofkat 1A (P5) /January 16, 2008 Total Field Strength: 57574.445 nT ° Tort 1 AHD 1 DDI I ERD ratio: 82.840° 19448.25 ft 16.094 11.152 Magnetic Dip:. 80.635 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet / Declination Date: February 16, 2008 Location LatlLong: N 70.23005176, W 150.78908358 Magnetic Declination Model: BGGM 2007 Location Gdd NIE YIX: N 5934319.630 ftUS, E 402239.090 ftUS North Reference: True North ~ ° Gdd Convergence Angle: -0.74257904° Total Corr Mag North •> True North: +22.298 Grid Scale Factor. 0.99991086 Local Coordinates Referenced To: Well Head L > 1 Grev Ma Directional L it d Comments Measured Inclination Azimuth Sub-SeaTVD TVD Vertical Section NS EW g Tool Face DLS Difficulty Northing Easting Latitude ong u e Depth ft ft ft ft ft de d 100 ft Index ftUS ftUS ft de d ~c~ no _~o~a ~o Ana d51 O.OO 5.21 5933586.78 400313.32 N 70.22798077 W 150.80454751 Crv 411 W End Crv Topset 3 HRZ Kalubik Target 1 LCU Target 2 Alpine C TD / 7" Lnr 4100.00 58.41 243.97 3062.09 3112.71 4200.00 57.38 239.41 3115.18 3165.88 4300.00 56.52 234.74 3169.74 3220.44 4400.00 55.83 230.00 3225.43 3276.13 4500.00 55.33 225.19 3281.98 3332.68 4580.97 55.06 221.26 3328.21 3378.91 5787.75 55.06 221.26 4019.30 4070.00 10380.21 55.06 221.26 6649.30 6700.00 10711.99 55.06 221.26 6839.30 6890.00 10938.99 55.06 221.26 6969.30 7020.00 12737.56 55.06 221.26 7999.30 8050.00 12999.49 55.06 221.26 8149.30 , 8200.00 2010.07 -792.38 -1994. 69 106.16E 4.00 5.25 5933553.23 2092.27 -832.53 -2069. 24 103.73E 4.00 5.30 5933514.06 2174.95 -878.05 -2139. 58 101.19E 4.00 5.35 5933469.46 2257.72 -928.73 -2205. 35 98.55E 4.00 5.39 5933419.64 2340.17 -984.33 -2266 .24 95.83E 4.00 5.43 5933364.84 2406.42 -1032.75 -2311 .75 --- 4.00 5.46 5933317.02 3389.25 -1776.45 -2964. 15 --- 0.00 5.62 5932581.90 7129.48 -4606.64 -5446. 86 --- 0.00 5.97 5929784.38 7399.69 -4811.10 -5626. 22 --- 0.00 5.99 5929582.28 7584.56 -4951.00 -5748 .94 --- 0.00 6.00 5929444.00 9049.37 -6059.40 -6729 .26 --- 0.00 6.08 5928348.39 9262.69 -6220.82 -6862 .86 --- 0.00 6.09 5928188.83 North ing m [ftUS] Easting (X) [ftUS] • 5934319.63 ~ 402239.09 / ~ ~ 1 5929444.00 396427.00 ~ ^ / 5928348.39 395440.49 ( / , 5928188.83 395296.82 400234.48 N 70.22788628 w 15U.8U51 ttul o 400159.42 N 70.22777656 W 150.80578167 400088.51 N 70.22765214 W 150.80634912 400022.09 N 70.22751363 W 150.80687974 399960.50 N 70.22736170 W 150.80737094 399914.36 N 70.22722936 W 150.80773813 399252.44 N 70.22519700 W 150.81300021 396733.49 N 70.21746130 W 150.83301587 396551.51 N 70.21690236 W 150.83446129 396427.00 N 70.21651992 W 150.8354 395440.49 N 70.21348964 W 150.8432 395296.82 N 70.21304831 W 150.84442 Leval Description: Surface : 661 FSL 1808 FEL S11 T10N R5E UM Target 1 LCU : 988 FSL 2282 FEL S15 T10N R5E UM Target 2 Alpine C : 5159 FSL 3255 FEL S22 T10N R5E UM BHL : 4997 FSL 3397 FEL S22 T10N R5E UM WeIlDesign Ver SP 2.1 Bld(docAOx_100) Tofkat 1\Tofkat 1\Toflcat 1A\Tofkat 1A (P5) Generated 1/16/2008 2:48 PM Page 1 of 1 Brooks Range Petroleum Corporation Schlumberger ~" Tofkat 1A (P5) FIELD North Slope Brooks Range 6TRUCiURE Tofkat 1 Me9netk Parameters 6uRace Location NAD2] Ahska Btete %anes. Zene 04, U6 Feat Miscelbneous Motlel: RGGM 300] DV: W.636' Date. February 16.2008 Le[. N]01348.186 NoRNng: 5934319.63 RUS Grk GOnV: -0.]925]904' Sbt'. Tolkatt NOReY Rotary Tabk (50.]OR above M6L) Mag Dec: 922.298' F8: 5)5]0.4 nT Lon: W1504]20.]01 EasOng: 402239.09flU6 Scale Facl'. 0.99991088W Plan: ToMat to (P6) Srvy Date: bnuary 16, 2008 0 1500 3000 4500 6000 7500 9000 10500 0 1500 3000 0 0 Ln C 4500 U F- 6000 7500 ss/a^~s Entl Crv Top3et 3 HRZ _ Kalubik al to Tg CU Target 7 LCU i Target 2 Alpine C ~ b TD / 7" Lnr ofkat 1A (P5~ ofkat { (PS) 0 1500 3000 4500 6000 7500 0 1500 3000 4500 6000 7500 9000 10500 Vertical Section (ft) Azim = 227.81 °, Scale = 1(in):1500(ft) Origin = 0 N/-S, 0 E/-V 0 -1200 n n Z -2400 0 0 N C N ~ -3600 N V V V -4800 -6000 Brooks Range Petroleum Corporation Schlumberger ~" Tofkat 1A (P5) %E~ North Slope Brooks Range STRUCTURE Tofkat 1 Magtwti<Parenremrs 6odace LawROn NAD2] Abska State %anes, Zom Og, US Foet Misceganeeus Modal: aGGM 200] D4: 60.635' Date: Febuery 16, 2006 lat N]013 a6.te6 NoMirq: 5930319.63 RU6 Gnd COnv.-0.]4Ya]904' 6bt. Tofkatl NDReI: Rotary Tabb (50.]ORabove M6U Mag Dec'. 122396° FS: 5]5]0.4 nT Lnn: W1504]20.]01 Eaatiig: 902239.09 flU6 6wk Fatt'. 0.9999106569 %an: Tofkat lA (PS) Srvy Date: January 16, 2006 -9600 -8400 -7200 -6000 -4800 -3600 -2400 -1200 0 d at 1 (PS1 Target 1 LCU Tofkat 1A Tgt 1 LCU j Target 2 F Tofkat 1A TD/7 ....................i...................................i................................. d 9S/8" Csg ................... ............... .............. ...... ..........GrvAN QO.... End Crv 9600 -8400 -7200 -6000 -4800 -3600 -2400 -1200 0 «< W Scale = 1(in):1200(ft) E »> 0 -1200 -2400 •i -3600 -4800 s • '~, Brooks Range Petroleum Company 'i Tofkat #1 A Sidetrack M~ SWACO ~. DRILLING FLUIDS PLAN Brooks Range Petroleum Corporation Tofkat #1 A Sidetrack Mud Program Name Signature Date Originator: Kemp Webb Reviewed by: Hal Martens Customer A royal: Version: 1.0 Location North Slope Alaska Confidential 1 Date: October 8, 2007 Brooks Range Petroleum Company Tofkat #1 A Sidetrack Well Summary Tofkat #1A exploration sidetrack well is located east of the native village of Nuiqsut. The Tofkat ice road spur will depart from the annual Alpine ice road and proceed south to the Tofkat ice pad location. An 8-1/2" "sidetrack" is planned to kickoff r at 4,000' MD / 3,010' TVD. The Production sidetrack interval will be drilled with a planned system mud weight of 10.0 ppg to 10.5 ppg to interval TD at 12,999' MD / 8,149' TVD using a combination of new and recycled VERSAPRO NT MOBM. A 7" liner is planned to be set at TD. As with all exploration wells some geologic uncertainty exists. Communicate with the rig team to determine what the actual needs of the well are. Remember the main purpose of the well is to gather information in a safe and environmentally sound manner. All decisions made concerning the integrity of the well should keep this in mind. Lost circulation may also occur in the final leg of this well. ECD's should be monitored closely. Contingency should be made to have extra volumes of drill-in fluids on hand prior to drilling ahead. Lost circulation material should also be readily available. Fluid and Drilling Concerns - Wellbore stability throughout the drilling phase of the operations. - Hole cleaning - Control of ECD's - Lost circulation -well control - Minimized torque and drag. - Good cement jobs. - Hole condition to allow logging operations. - Minimization and management of waste costs for the "drill cuttings" and associated fluids. Monitoring and efficient utilization of the trucks as required for this operation. Daily and interval summaries will be tallied and summarized for the end of well report. - HSE Location North Slope Alaska Confidential 2 Date: October 8, 2007 s ~- Brooks Range Petroleum Company Tofkat #1 A Sidetrack Project Summary Casing Hole TVD Mud Size Size MD ss Density Range (inl (in) Profile (ft) (ft) (ppg) 3,879 2,949 10.0 ~ 9.625" NA KOP KOP Recycled 4,000 3,010 VERSAPRO NT 10.0 (initial) (Leer) 8.5" 12,999 8,149 10(OtTD0.5 Recycled VERSAPRO NT Location North Slope Alaska Confidential 3 Date: October 8, 2007 Brooks Range Petroleum Company Tofkat #1 A Sidetrack Milling Casing and Production Interval Drilling Fluid System VERSAPRO NT Key Products LVT-200, IMG 400, Lime, VERSACOAT HF, VERSAWET, VERSAMOD, VERSAHRP, S-200, Brine 10.8 CaCl2 , MI WATE Barite Solids Control Shakers, Mud cleaner, Centrifuge Potential Problems Lithologic instability near the wellbore. Lost Circulation Hole cleanin . Production Interval Drill-in Fluid Properties Properties Initial Value Density (ppg) 10.0 ppg -Initial Make-Up Weight 10.5 - Possible b TD Funnel Viscosity (seconds) 35 - 45 Yield Point (cP) 15 - 28 Plastic Viscosity (Ib/100 sf) 15 - 25 Oil :Water 70:30 Electrical Stability (mlVolts) 650 - 900 HTHP Fluid Loss (ml/30 min/200 psi/150° F) <4 VersaPro NT Formula Mineral Oil-LVT 200 (.825 SpG) 0.711 bbl ~ IMG 400 6.0 ppb S-200 45 ppb Lime 7.5 ppb VERSACOAT HF 5.0 ppb VERSAWET 2.12 ppb MI WATE 53.37 ppb Brine (10.8 ppg CaCl2) 0.176 bbl VERSA MOD 0.5 ppb VERSAHRP 0.5 ppb Location North Slope Alaska Confidential 4 Date: October 8, 2007 s • Brooks Range Petroleum Company Tofkat #1 A Sidetrack Production Interval S.C.E. Operation Standards: Shakers- • Inspect decking rubbers, c/o as necessary. • Install XR Magnum screens (175-210 mesh). Ensure screens are properly tensioned, per M-I Swaco's best practice suggestions. Spray down new screens with fresh water before operating the shakers. • Set counterweights to 90% (7.8 G's) for optimum performance. • As fluid shears, screen up as necessary to higher mesh screen sizes. 210 mesh is optimum to reduce sand sized particles. • Ensure jacking system on ALSII shakers enables the fluid to flow to the center of the screens, adjust and lock as necessary. De-Silter- • Ensure cuttings trough bypasses shakers, and goes into cuttings ditch. Failure to do so will allow small particles to enter right back into system through the flow line shakers (84-110 mesh screens). • Install 3/8" Apexes. • Ensure that "feet of head" gauge is available at the De-Silter, not the pump. • Ensure that De-Silter feed pump can achieve 95' of head. CRITICAL! • Monitor discard, change apexes as necessary to improve solids content in mud (it may be determined that 3/8" apexes can be installed if cuttings in the system happen to be finer than presumed) • Discard should be 2-3 ppg over feed weight. Centrifuge- Production intervals generally call fora "high-speed" centrifuge, which is rotating at approximately 3200 rpm's. This allows the centrifuge to make the 3-6 micron cut, and eliminate a percentage of the "ultra fine" cuttings from the fluid. Through put must be decreased while running the centrifuge at 3200 rpm's, since there is a greater risk of "packing off" the centrifuge back drive and auger. Swaco would also suggest installation of amp meter on the back drive motor which will allow the operators to monitor the feed rates by knowing how much torque the back drive motor is receiving while trying to discharge the cuttings. Refer to mud man for solids information to determine speed and feed rate of centrifuge. Continual processing at low feed rates will yield better results than shutting centrifuge down and starting it up. Slow feed rate down to maintain an acceptable weight if needed. Location North Slope Alaska Confidential 5 Date: October 8, 2007 s ~- Brooks Range Petroleum Company Tofkat #1A Sidetrack Milling Casing and Production Interval Considerations The planned KOP for the TOFKAT 1A sidetrack is 4,000' MD / 3,010' TVD. The "sidetrack" production interval of the well will then by drilled using an 8-1/2" bit. This interval will be drilled with a planned system mudweight of 10.0 ppg to 10.5 ppg to interval TD at 12,999' MD / 8,149' TVD using a combination of new and recycled VERSAPRO NT MOBM. A 7" liner is planned to be set at TD. - Ensure that the fluid properties are maintained to provide the best possible hole cleaning. Maintain mud weights as per drilling program guide lines and ensure that rheology is optimized to reduce ECD's to a manageable level while drilling. Monitor for any fluid losses and flow back closely. - Control the ROP and flow rates as needed to avoid inducing a breakdown of any formations. Reduce pump rates immediately if packing off occurs. Pump high viscosity weighted sweeps and ream carefully to clean the hole before proceeding with further drilling - Adjust rheology, pipe rotation speed, pipe running speeds and pump rates as needed to balance hole cleaning and ECD. Use good drilling and tripping practices. Break circulation slowly -Reduce pump speed 15 to 20% while reaming down. - As an exploration well, pore pressure uncertainty also exists. Use all means possible to evaluate well conditions to determine if fluid properties are in line with the needs of the well. - Monitor and record drilling parameters on each connection and before and after any lubricant additions. - Upon reaching TD watch the bottoms-up cuttings closely. If the well does not readily cleanup or if there are any excess of torque, drag, pick-up or slack-off weights pump a second high viscosity/weighted sweep and observe bottoms up again. - Establish good hole conditions for any logging and testing that may be performed. - Fluid deliveries, fluid transfers, and cuttings disposal issues will be tracked on a daily basis. Location North Slope Alaska Confidential 6 Date: October 8, 2007 ~~ Brooks Range Petroleum Company Tofkat #1 A Sidetrack Milling Casing Production Interval Operations - This interval will be drilled using an 8.5" bit to an expected interval TD of 12,999' MD / 8,149' TVD. Care should be taken to monitor all drilling criteria to ensure that best drilling practices are being observed. - Maintain low gravity drilled solids to below 6% with solids control equipment and dilution. Use the MI Solids Van to supplement rig equipment, if needed. - Use Virtual Hydraulics ECD predictions vs. PWD actual values to appraise hole cleaning and hole conditions. If possible do not allow actual ECD's to exceed 0.5 ppg over predicted "clean hole" ECD. - Drill to interval TD and circulate the wellbore clean (3 - 4 bottoms up may be needed) in preparation for logging and testing. - While drilling monitor the interval carefully for losses or gains. - Log and/or test the well as per program. - Plug back or complete as per program. Location North Slope Alaska Confidential 7 Date: October 8, 2007 Brooks Range Petroleum Company Tofkat #1A Sidetrack Barite Sag Concerns Barite Sag (a reduction in the MW out due to the dynamic and static settling of barite) is a potential drilling hazard while using weighted fluids. Although this well is designed for a mud weights below -11.5 ppg unexpected conditions may make additional weight ups or lubricant additions necessary. Both of these changes may contribute to a more likely chance of barite sag issues. Barite Sag is also aggravated by circulating at low rates for extended periods of time or while tripping with drill pipe or casing. As a consequence, if it becomes necessary to circulate at reduced rates, it is recommended that the pit watcher weigh and record MW out using a pressurized and un-pressurized balance every 15 minutes. Trips and casing running should also be closely monitored for indications of barite sag. Location North Slope Alaska Confidential 8 Date: October 8, 2007 Brooks Range Petroleum Company Tofkat #1 A Sidetrack Recommended Lost Circulation LCM guidelines for VeRSaPRO NT MOBM The following lost circulation "Decision Tree" is recommended for use in the event that losses occur while drilling the horizontal production interval. It has been selected because of its' compatibility with base oil and ability to seal with minimal formation damage. These products are predominately acid soluble which will make any stimulated cleanup (if needed) much easier. I'~.o~i~n~g fluid ~rllile dr-illiing ~ Stop drilling and observe levels ~ ~ Yes ~ ~ Locate and stop losses ~ ~4ecard shuf ~n pres~crre. Kili OiUsynthetic mud Spot pill: G-Seal l5 ppb Calc. Carb. (M) 10 ppb Calc.Carb (C) 7 ppb Losses on surface Yes Well flowing? Measure rate of loss OiUsynthetic mud Spot pill: Ne success Mlea M 7 ppb No success Calc Carb Med. 10 ppb G-Seal 20 ppb Calc. Carb (C) 7 ppb Ensure particle sizes of bridging materials can pass through the downhole tools and motors prior to mixing and spotting. Spot pill across thief zone, if losses stop, pull into casing and apply 50-100 psi squeeze pressure and watch for pressure bleed- off. If pressure holds for 15 minutes, resume drilling. If pressure does not hold, spot another pill as described above. Be sure to clear the motor with any Lost Circulation >L Oil/synthetic mud Squeeze pill: FORM-A-SQUEEZE 80 ppb in base oil weighted up to desired density Nu success ~ Location North Slope Alaska Confidential 9 Date: October 8, 2007 Brooks Range Petroleum Company Tofkat #1 A Sidetrack Recommended LCM Pill for VersaPro NT System The following lost circulation pill is recommended for use in the event that losses occur while drilling the horizontal production interval. It has been selected because of its' ability to seal with minimized formation damage. These products are predominately acid soluble which will make any stimulated cleanup (if needed) much easier. - To existing VersaPro NT circulating fluid make a LCM pill with: • 15 ppb LoWate (fine calcium carbonate) • 15 ppb Safe-Garb Medium (medium calcium carbonate) • 15 ppb Safe-Garb Coarse (course calcium carbonate) Insure particle sizes of bridging materials can pass through the downhole tools and motors prior to mixing and spotting. 1. Spot pill across thief zone, if losses stop, pull into casing and apply 200-psi squeeze pressure and watch for pressure bleed-off. If pressure holds for 15 minutes, resume drilling. If pressure does not hold, spot another pill as described above. 2. If losses cannot be stopped with calcium carbonate only, mix up a LCM pill with 25 ppb MIX II Fine and 15 ppb MIX II Course cellulosic material and spot as above. If seepage losses occur after drilling is resumed, consideration should be given to adding 5 - 8 ppb MIX II Fine cellulosic material to system while circulating. Location North Slope Alaska Confidential 10 Date: October 8, 2007 • Brooks Range Petroleum Company Tofkat #1 A Sidetrack HSE Issues Handling of Drilling Fluid Products Health and Safety - Drilling crews should be instructed in the proper procedures for handling fluid products. - Personal Protective Equipment (PPE) charts should be posted in the pit room, the mud lab, and the office of the Drilling Forman. - PPE must be in good working order and be utilized as recommended by the PPE charts. - Product additions should be made with the intent to use complete unit amounts of products (sacks, drums, cans), as much as possible in order to minimize inventory of partial units. - Ensure all MSDS sheets are up to date and readily available for workers to access for information. Environmental - Ensure that alf product stored outside is protected from the weather. - Do not store partial units (sacks) outside if possible. - When transferring fluids and/or cuttings from the rig to tanks, ensure all hoses are properly secured. Perform a transfer checklist as needed in order to avoid spills. ® ~~ Location North Slope Alaska Confidential Date: October 8, 2007 i Brooks Range Petroleum Company Tofkat #1 A Sidetrack PPE Chart Product Function Health Flammability Reactivity PPE MI WATE (Barite) eighting Agent *1 0 0 E MIX II Lost Circulation Material *1 1 0 E DRISPAC PLUS SL Fluid Loss Reducer 1 1 0 E LVT 200 Mineral Oil 1 1 0 J G SUPREME Viscosifier 2 1 0 J LIME Calcium Source 2 0 0 E ERSACOAT HF Emulsifier *2 3 0 J ERSAWET Drilling Fluid Additive 1 1 0 J CACL2 eighting Agent 1 0 1 E ERSA-MOD Rheology Modifier 1 2 0 J ERSA HRP Viscosifier 2 1 0 J SAFECARB Bridging Agent *1 0 0 E HAZARDOUS MATERIALS IDENTIFICATION SYSTEM (HMIs) HAZARD RATINGS 4 -Severe hazard 3 -Serious hazard 2 -Moderate hazard 1 -Slight hazard 0 -Minimal hazard * An asterisk next to the health rating indicates that a chronic hazard is associated with the material. HMIs PERSONAL PROTECTIVE E(~UIPMENT INDEX A -Safety Glasses B -Safety Glasses, Gloves C -Safety Glasses, Gloves, Synthetic Apron D -Face Shield, Gloves, Synthetic Apron E -Safety Glasses, Gloves, Dust Respirator F -Safety Glasses, Gloves, Synthetic Apron, Dust Respirator G -Safety Glasses, Gloves, Vapor Respirator H -Splash Goggles, Gloves, Synthetic Apron, Vapor Respirator -Safety Glasses, Gloves, Dust and Vapor Respirator J -Splash Goggles, Gloves, Synthetic Apron, Dust and Vapor Respirator K -Air Line Hood or Mask, Gloves, Full Suit, Boots X -Consult your supervisor for special handling directions. O 0 A +~ D See Material Safety Data Sheets (MSDS) for more information M-I L.L.C, Occupational Health Department (Revision -April 10, 2003) Houston, TX, Telephone: 281/561-1509 M-I L.L.C, Occupational Health Department (Rev. 4Aug-98) Houston, TX, Telephone: 281/561-1509 080598PRHS-1 Location North Slope Alaska Confidential 12 Date: October 8, 2007 • Brooks Range Petroleum Corporation Brooks Range Petroleum Corporation 2007/08 Exploration Campaign REVISION #4 Tofkat #1 A Sidetrack Contingency Cementing Programs Prepared for Amjad Chaudhry Fairweather E & P Services, Inc. January 16, 2008 Submitted by: Mark Wedman, PE Sr. District Product Service Line Manager -Cementing Halliburton Energy Services 6900 Arctic B lvd. Anchorage, AK. 99518 (907) 275- 2610 -office (907) 223-5763 -cell ~ ~°`~: • BROOKS RANGE P~ROLEUM CORPORATION / ~ Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Wellbore Schematic 8-1/2" hole U. Kuparuk perf's Alpine C perf's 7" casing at 8,200' TVD, 12,999' MD 16" conductor at 80' ofkat #1 9-5/8" casing t 3,000'TVD, 3,835'MD kat #1 A KOP, iipstock at 3,685' to 35'MD 8-1/2" hole fkat #1 TD at 8,200' TVD, 14,155'MD ISO 14001 Certified ~~~ Alaska Green ctar rertitiPd Last Updated 9/18/07 Name revision 10/1/07 Tofkat #1 A ~,`~ ~ ro / ~\ Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Geo-Mechanical Plot Tofkat #1 Geo-mechanical Plot 0 1,000 2,000 3, 000 ~ 4,000 .., t a d O ~ 5,000 ate,. d d 7 H 6,000 7,000 8, 000 9,000 10,000 ~s~~ ~ P rmafro t --- --- --- --- - - Min ryrav Is-- --- -- --- -~-- _ _ _ __. _ nea surd ay - Frac rad. stic ing to it and BHA est S ale W II (K-5) ud W fight ~\ Pore P ess. + rilling argin) opset --- --- --- --- - - --- -- --- --- -M Z-- ---- _ _ _ _._ _ _ - _ _ _ _ _O cassio al tigh _ _ _ _ _ - t _ _ _. _ _ ._ h le, led es and ~„ p cking ff --- --- -- -- --- Tfl- --- --- -- --- --Alp ine.C- 8 10 12 14 16 18 Mud Wt. in ppg ISO 14001 Certified i,l~-~LiBURT01~ Alaska Green Star Certified • BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Cementing Summary -Tofkat #1 A Sidetrack Revision Notes: Revision #1(11-17-07) • Changed MD of 7" Casing from 11,183' to 12,440 MD Revision #2 (11-20-07) • Changed Kickoff point from 2,000' MD inside surface casing to 4,000' MD inside open hole • Changed MD of 7" Casing from 12,440' to 12,557' MD Revision #3 (12-3-07) • Changed the placement of the whipstock plug. The top of the 750' plug will be at 3,685' MD, 150' inside the surface casing. Revision #4 (1-16-08) • Imported updated directional survey. The new MD is 12,999.5'. The TVD remained 8,200' Assumptions: 8-1/2" open hole had hydrocarbon shows requiring an open hole abandonment plug 750' Cement plug will be used as whipstock 7" Production Casing o Weight of 7" casing is 26 #/ft & thread is BTC 0 30% open hole excess o Frac Gradient 17.4 ppg @ 8,200' TVD o Desired TOC is 100' inside 9-5/8" casing Plugs -Tofkat #1 Abandonment &Tofkat #1 A Whipstock It is assumed for purposes of this program that that 8-1/2" hole was drilled in the Tofkat #1 main wellbore and casing was not set. It is assumed that hydrocarbon zones were present requiring open hole abandonment of those intervals. The cement volumes and qty of open hole hydrocarbon abandonment plugs are unknown. For planning purposes, an open hole plug sufficient for 1,000' of fill is presented. A 750' open hole cement whipstock plug will then be set to effect a kickoff for the sidetrack. Plug #1 (Open Hole Hydrocarbon Bearing Interval)) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess Plug #2 (Whipstock Plug inside 8-1/2" Open Hole and 9-5/8" 40#/ft Surface Casing) Displacement or Balanced Plug method: Place a 750' densified whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. ISO 14001 Certified ~• Alaska Green Star Certified • BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Cementing Summary -Tofkat #1 A Sidetrack (cont'd) 7" Production Casing ECD Program based on 8,822' of cement slurry and a frac gradient of 17.4 ppg Length of Tail Slurry (ft) Length of Lead Slurry (ft) Max ECD (qpg) V' 2,000 7,264 13.82 Centralization The minimum recommended standoff for centralization is the standoff required for a minimum of 1/z" annular radial clearance (or 67% standoff in a 7" by 8-1/2" hole). With radial clearances less than 1/z"- the probability of channeling cement is high. Number of Centralizers/Tune Standoff Achieved Radial Clearance Achieved (in) 224 Total Bow Spring Centralizers 66.5% 0.50" Summary of Abandonment Plugs -Tofkat #1 A Planning/Assumptions: A number of options exist for plugging the well depending on well construction status at the time of plugging (i.e. production casing set or not) and whether or not the plugging operations are for PTA or Suspension purposes. For purposes of this program, it is assumed the 7" production casing is set and perforated and the well is to be PTA'd.. Plug #1 (Hydrocarbon bearing interval inside 7" production casing ) Downsqueeze method: To reduce WOC time -set 7" 26# EZSV 50' above top perforation. Sting in and downsqueeze with a cement volume equivalent to fill cement from EZSV to 100' below the lowermost perforation. Unsting from EZSV and lay in 50' of cement slurry on top of EZSV. POOH several joints and pressure test EZSV (1,500 psig or 0.25 psi/ft multiplied by TVD, whichever is greater). POOH to surface casing shoe. Plug #2 (9-5/8" Casing Shoe Depth inside 7" 26#/ft casing) Displacement or Balanced Plug method: 100' of cement below the 9-5/8" casing setting depth to 100' above 9-5/8" casing setting depth inside 7" 26#/ft casing.: Plug #3 (Surface 9-5/8" 40#/ft casing and 7" 26#/ft casing) Displacement or Balanced Plug method:: With 7" casing cut and retrieved at 105' Seta 200' balanced plug from 100' inside the 7" casing stub and 100' above the 7" stub inside 9-5/8" casing with top of cement no less than 5' below surface. ISO 14001 Certified Alaska Green Star Certified • BROOKS RANGE P~OLEUM CORPORATION brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services BROOKS RANGE PETROLEUM CORPORATION 2007-08 -Exploration Project Alaska; USA REVISION #3 TOFKAT #1 Abandonment (7" Not Set) Whipstock Plug for Tofkat #lA Sidetrack Cement Plugs Prepared for: Amjad Chaudhry December 3, 2007 Prepared by: Mark Wedman Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK 99518 907-275-2610 -office 907-223-5763 -cell HALLIBURTON The Future Is Working Together. ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Plugs -Tofkat #1 Abandonment &Tofkat #1 A Whipstock It is assumed for purposes of this program that that 8-1/2" hole was drilled in the Tofkat #1 main wellbore and casing was not set. It is assumed that hydrocarbon zones were present requiring open hole abandonment of those intervals. The cement volumes and qty of open hole hydrocarbon abandonment plugs are unknown. For planning purposes, an open hole plug sufficient for 1,000' of fill is presented. A 750' open hole cement whipstock plug will then be set to effect a kickoff for the sidetrack. • Plug #1 (Open Hole Hydrocarbon Bearing Interval)) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess • Plug #2 (Whipstock Plug inside 8-1/2" Open Hole and 9-5/8" 40#/ft Surface Casing) Displacement or Balanced Plug method: Place a 750' densified whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. Plug #1: Displacement or Balanced Plug method (Hydrocarbon bearing interval) Displacement or Balanced Plug method: seta 1,000' balanced plug inside 8-1/2" open hole with 30% excess Plug Slurry: 91.3 bbls - 446 sks. Premium Cement+ 0.4% Halad-344 (Fluid Loss Additive), + .2% CFR-3 (Friction Reducer), + 0.1% HR-5 (Retarder) or as required PIuQ Slurry Density (ppg) 15.8 Yield (cu ft / sk) 1.15 Water requirements (gal/sk) 5.00 Fluid Loss (cc/30 min.) <100 Free Water % 0 Thickening Time Hr: min. +/- 3:00 Compressive Strength -PSI 12 hr (est.) >800 @ 150 °F 24 hr (est.) >1,300 @ 150°F ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Plugs -Tofkat #1 Abandonment &Tofkat #1 A Whipstock (cont'd) Plug #2: Displacement or Balanced Plug method (750' Whipstock Plug inside 9-5/8" 40#/ft casing) Displacement or Balanced Plug method: Place a 750' densified whipstock plug from 3,685' to 4,435'. Inside 8-1/2" open hole + 30% excess and 9-5/8" 40#/ft surface casing. Plug #2: 66.2 bbls - 375 sks Premium Cement+ 0.5% Halad-344, + .2% CFR-3 + HR-5 if required Cement Slurry Properties* Properties Density (ppg) Yield (cu ft / sk) Water requirements (gal/sk) Thickening Time Hr: min. @ 100 F Compressive Strength -PSI -13 hr (UCA)) Compressive Strength -PSI -23 hr (UCA)) Kick-off Plug Slurry 17.0 0.99 3.82 +/- 4:00 1,400 @ 70 °F 3,240 @ 70 ~ ISO 14001 Certified Alaska Green Star Certified • BROOKS RANGE P~ROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration-North Shore #lA Cementing Services BROOKS RANGE PETROLEUM CORPORATION 2007-08 Exploration Project Alaska; USA REVISION #3 TOFKAT #lA SIDETRACK OptiCem - 7" Production Casing Prepared for: Amjad Chaudhry January 16, 2008 Prepared by: Mark Wedman Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK 99518 907-275-2610 -office 907-223-5763 -cell HALLIBURTON The Future Is Working Together. ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing Well Conditions Casing Size & Wt. 7" 26#/ft L-80 BTC 0-12,557'/ 8,200' MD/TVD Kickoff Point: 4,000'MD, 3,087' TVD Volume Excess 30% Previous Casing: 9-5/8" 40#/ft L-SO 0 -3,835' Mud Wt. 10.2 ppg OBM Hole Size 8-1/2" Mud PV/yP 25/20 Top of Cement: 3,735' BHST/BHCT 190°F / 150°F Ft of Fill -Tail Slurry: 2,000' Frac Gradient: 17.4 ppg @ 8,200' TVD Slurry Recommendation: Preflush /Spacer 10 bbl Water, 20 bbl 12.0 ppg Dual Spacer + 1 add'1 gal. 434B Stabilizer /bbl Lead Slurry: 213.2 bbls - 369 Sks. Premium Cement + 3% (bwoc) Econolite (Extender), + 0.5% (bwoc) CFR-3 (Friction Reducer), + 0.5% (bwoc) Halad 344 (Fluid Loss Additive), + HR-5 (Retarder) if required Tail Slurry: 62.0 bbls - 303 Sks. Premium Cement+ 0.4% Halad-344 (Fluid Loss Additive), + .2% CFR-3 (Friction Reducer), + 0.1% HR-5 (Retarder) or as required Displacement: 494.2 bbls. Mud Spacer Lead Slurry Tail Slurry Density (ppg) 8.34 / 10.0 11.2 15.8 Yield (cu ft / sk) 3.24 1.15 Water requirements (gal/sk) 20.4 5.00 Fluid Loss (cc/30 min.) <200 <100 Free Water % 0 0 Thickening Time Hr: min. +/- 4:00 +/- 3:00 Compressive Strength -PSI 12 hr (est.) 100 @ 90 °F >700 @ 130 °F 24 hr (est.) 200 @ 90 °F >1,200 @ 130°F Volumes based on: Lead slurry: Top of Lead cement @ 3,735' 100' of 7" by 9-5/8" 40#/ft casing +6,722' of 8-1/2" by 7" calculated annulus volume plus 30% excess Tail slurry: Top of Tail slurry 10,999' 2,000' of 8-1/2" by 7" calculated annulus volume plus 30% excess + 85 foot shoe joint. ISO 14001 Certified Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE P~ROLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Design Customer Information Cus#omer Brooks Ran a Petroleum Cor oration Sales Order Job Configuration Conventional Cement .Well Name Tofkat #1A 'Well Number Start Time Wednesda , Januar 16, 2008 County State Alaska UWI/API Cauntr United States of America H2S Present Unknown C02 Present Unknown Customer Re resentative Am'ad Chaudr Service Re resentative Mark Wedman Desi n Name Brooks Ran a Tofkat #1A Production Comment In'ection Path Casin Parameters Fracture Zone Measured pe th 12999.5 ft Fracture Zone Gradient 0.904 si/ft Fracture Zone Densit 17.40 Ib/ al Fracture Zone Pressure 7413 si Reservoir Measured Depth 12999.5 ft Reservoir Pore Pressure 4260 si Reservoir Zone Gradient 0.519 si/ft Reservoir Zone Densit 10.00 Ib/ al Back Pressure 0 si Rate Redesi n Safet Factor 10 si Simulator Volume Increment 10.00 bbl Shoe Track Len th 85.0 ft Additional Pressure to Seat Plu 1000 si Eccentricit Enhanced Calculations No Erodibilit Enhanced Calculations No Use Couplirt Information No ISO 14001 Certified Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exptoration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Wellbore Orientation Measured Depth True Vertical De th `Deviation Build Angle Azimuth 0.0 0.0 0.0 248.4 500.0 500.0 0.0 0.00 248.4 600.0 600.0 1.5 1.50 248.4 2924.1 2516.8 59.6 2.50 248.4 4000.0 3061.2 59.6 0.00 248.4 4200.0 3165.9 57.3 -1.16 239.4 4400.0 3276.1 55.8 -0.73 230.0 4500.0 3332.7 55.3 -0.49 225.2 4581.0 3378.9 55.0 -0.33 221.3 12999.6 8200.2 55.1 0.00 221.3 Wellbore Geometry MD Hole Ex. Hale ilia. Casing OD Casing ID Casing Wei ht ft % in in in Ib/ft 3835.0 0.00 8.835 7.000 6.276 26.000 12999.5 30.00 8.901 7.000 6.276 26.000 Pumping Schedule No. Description Densit Rate Volume Duration Ib/ al b m bbl min 1 10.2 Mud OBM 10.20 5.00 0.00 0.00 2-1 Dual S acer 12.00 5.00 20.00 4.00 2-2 Shutdown 5.00 3 3% Econolite Lead Slurr 11.20 5.00 213.18 42.64 4 Production Tail .15.80 5.00 61.98 12.40 To Plu 5 10.2 Mud OBM 10.20 5.00 494.14 98.83 Total 789.30 162.86 Fracture GradientlPore Pressure Profile Measured True Pore Reservoir ` Reservoir Fracture Fracture Fracture Depth Vertical Pressure Gradient Density Gradient Density Pressure Depth ft ft si psi/ft Ib/ al psfft Ib/ al si 12999.5 8200.8 4260 0.519 10.00 0.904 17.40 7413 IS014001 Certified Alaska Green Star Certified • Brooks Range Petroleum Corporation BROOKS RANGE P~ROLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Centralizers Centralizer Parameters Calculated Standoff/Spacing Profile Fluid Profile During Mud Conditioning Mud Density 10.20 lb/gal Maximum Distance between Centralizers 400.0 ft Minimum Distance between Centralizers 10.0 ft Top of Centralized Interval Measured Depth 3875.0 ft Top of Centralized Interval Standoff 100.00 % Centralizer Specifications Part Number Type* `COD Hole Dia. :Nom. Dia. Min. Dia. Start Force Run Force Rest. Force Bows in in in in Ibf Ibf Ibf 806.60043 BS 7.000 8.500 9.375 8.250 829 413 2856 4 "BS -Bow Spring, R(S) -Rigid Solid, R(PB) -Rigid Positive Bar Constant Spacing/Standoff Centralizer Intervals Base of Centralizer A Centralizer B Pattern Required Spacing Interval Part Number Part Number Standoff Measured Depth ft % ft 12999.5 806.60043 A 67.00 ISO 14001 Certified *~ Alaska Green Star Certified • Brooks Range Petroleum Corporation BROOKS RANGE P1~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Centralizer Spacing/Standoff Calculations No. Centralizer Part Number Type Spcrtg MD Hole Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ft o o % Ibf Ibf 235 806.60043 BS 28.0 12999.5 55.1 221.3 66.54 252 0 234 806.60043 BS 39.5 12971.5 55.1 221.3 67.47 607 352 233 806.60043 BS 39.5 12932.0 55.1 221.3 66.55 711 848 232 806.60043 BS 39.5 12892.5 55.1 221.3 66.58 711 1345 231 806.60043 BS 39.5 12852.9 55.1 221.3 66.62 711 1842 230 806.60043 BS 39.5 12813.4 55.1 221.3 66.66 711 2338 229 806.60043 BS 39.5 12773.9 55.1 221.3 66.69 711 2835 228 806.60043 BS 39.5 12734.3 55.1 221.3 66.73 711 3332 227 806.60043 BS 39.5 12694.8 55.1 221.3 66.76 711 3828 226 806.60043 BS 39.5 12655.3 55.1 221.3 66.80 711 4325 225 806.60043 BS 39.5 12615.7 55.1 221.3 66.83 711 4822 224 806.60043 BS 39.5 12576.2 55.1 221.3 66.87 711 5318 223 806.60043 BS 39.5 12536.7 55.1 221.3 66.90 711 5815 222 806.60043 BS 39.5 12497.2 55.1 221.3 66.94 711 6312 221 806.60043 BS 39.5 12457.6 55.1 221.3 66.97 711 6808 220 806.60043 BS 39.5 12418.1 55.1 221.3 67.00 711 7305 219 806.60043 BS 39.5 12378.6 55.1 221.3 67.04 711 7802 218 806.60043 BS 39.5 12339.0 55.1 221.3 67.07 711 8298 217 806.60043 BS 39.5 12299.5 55.1 221.3 67.11 711 8795 216 806.60043 BS 39.5 12260.0 55.1 221.3 67.14 711 9292 215 806.60043 BS 39.5 12220.4 55.1 221.3 67.17 711 9789 214 806.60043 BS 39.5 12180.9 55.1 221.3 67.21 711 10285 213 806.60043 BS 39.5 12141.4 55.1 221.3 67.24 711 10782 212 806.60043 BS 39.5 12101.8 55.1 221.3 67.27 711 11279 211 806.60043 BS 39.5 12062.3 55.1 221.3 67.30 711 11775 210 806.60043 BS 39.5 12022.8 55.1 221.3 67.34 711 12272 209 806.60043 BS 39.5 11983.3 55.1 221.3 67.37 711 12769 208 806.60043 BS 39.5 11943.7 55.1 221.3 67.40 711 13265 207 806.60043 BS 39.5 11904.2 55.1 221.3 67.43 711 13762 206 806.60043 BS 39.5 11864.7 55.1 221.3 67.47 711 14259 205 806.60043 BS 39.5 11825.1 55.1 221.3 67.50 711 14756 204 806.60043 BS 39.6 11785.6 55.1 221.3 67.48 711 15252 203 806.60043 BS 39.6 11746.0 55.1 221.3 67.46 712 15749 202 806.60043 BS 39.6 11706.4 55.1 221.3 67.49 712 16247 201 806.60043 BS 39.6 11666.9 55.1 221.3 67.47 712 16744 200 806.60043 BS 39.7 11627.2 55.1 221.3 67.46 713 17242 199 806.60043 BS 39.7 11587.6 55.1 221.3 67.49 713 17740 198 806.60043 BS 39.7 11547.9 55.1 221.3 67.47 714 18239 197 806.60043 BS 39.7 11508.2 55.1 221.3 67.50 714 18737 196 806.60043 BS 39.7 11468.6 55.1 221.3 67.48 714 19236 195 806.60043 BS 39.7 11428.8 55.1 221.3 67.46 715 19735 194 806.60043 BS 39.7 11389.1 55.1 221.3 67.49 715 20234 193 806.60043 BS 39.8 11349.4 55.1 221.3 67.47 715 20734 192 806.60043 BS 39.8 11309.6 55.1 221.3 67.46 716 21234 191 806.60043 BS 39.8 11269.8 55.1 221.3 67.49 716 21734 190 806.60043 BS 39.8 11230.0 55.1 221.3 67.47 716 22234 189 806.60043 BS 39.8 11190.1 55.1 221.3 67.50 717 22735 ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services No. Centralizer Part Number Type ' Spcng MD ' Hole Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ft % Ibf Ibf 188 806.60043 BS 39.9 11150.3 55.1 221.3 67.48 717 23235 187 806.60043 BS 39.9 11110.4 55.1 221.3 67.46 717 23736 186 806.60043 BS 39.9 11070.5 55.1 221.3 67.49 718 24237 185 806.60043 BS 39.9 11030.6 55.1 221.3 67.47 718 24739 184 806.60043 BS 40.0 10990.7 55.1 221.3 67.46 719 25240 183 806.60043 BS 40.0 10950.7 55.1 221.3 67.49 719 25743 182 806.60043 BS 40.0 10910.8 55.1 221.3 67.47 719 26245 181 806.60043 BS 40.0 10870.8 55.1 221.3 67.50 719 26747 180 806.60043 BS 40.0 10830.8 55.1 221.3 67.48 720 27250 179 806.60043 BS 40.1 10790.8 55.1 221.3 67.46 720 27753 178 806.60043 BS 40.1 10750.7 55.1 221.3 67.49 720 28256 177 806.60043 BS 40.1 10710.7 55.1 221.3 67.48 721 28759 176 806.60043 BS 40.1 10670.6 55.1 221.3 67.46 721 29263 175 806.60043 BS 40.1 10630.5 55.1 221.3 67.49 722 29767 174 806.60043 BS 40.1 10590.4 55.1 221.3 67.47 722 30271 173 806.60043 BS 40.1 10550.2 55.1 221.3 67.50 722 30775 172 806.60043 BS 40.2 10510.1 55.1 221.3 67.48 722 31280 171 806.60043 BS 40.2 10469.9 55.1 221.3 67.46 723 31785 170 806.60043 BS 40.2 10429.7 55.1 221.3 67.49 723 32290 169 806.60043 BS 40.2 10389.5 55.1 221.3 67.48 724 32795 168 806.60043 BS 40.3 10349.2 55.1 221.3 67.46 724 33301 167 806.60043 BS 40.3 10309.0 55.1 221.3 67.49 724 33807 166 806.60043 BS 40.3 10268.7 55.1 221.3 67.47 725 34313 165 806.60043 BS 40.3 10228.4 55.1 221.3 67.50 725 34819 164 806.60043 BS 40.3 10188.1 55.1 221.3 67.48 725 35326 163 806.60043 BS 40.4 10147.8 55.1 221.3 67.46 726 35833 162 806.60043 BS 40.4 10107.4 55.1 221.3 67.49 726 36340 161 806.60043 BS 40.4 10067.1 55.1 221.3 67.48 726 36847 160 806.60043 BS 40.4 10026.7 55.1 221.3 67.46 727 37355 159 806.60043 BS 40.4 9986.2 55.1 221.3 67.49 727 37863 158 806.60043 BS 40.5 9945.8 55.1 221.3 67.47 727 38371 157 806.60043 BS 40.5 9905.4 55.1 221.3 67.50 728 38879 156 806.60043 BS 40.5 9864.9 55.1 221.3 67.48 728 39387 155 806.60043 BS 40.5 9824.4 55.1 221.3 67.47 729 39896 154 806.60043 BS 40.5 9783.9 55.1 221.3 67.49 729 40405 153 806.60043 BS 40.6 9743.4 55.1 221.3 67.48 729 40915 152 806.60043 BS 40.6 9702.8 55.1 221.3 67.46 730 41424 151 806.60043 BS 40.6 9662.2 55.1 221.3 67.49 730 41934 150 806.60043 BS 40.6 9621.7 55.1 221.3 67.47 730 42444 149 806.60043 BS 40.6 9581.0 55.1 221.3 67.46 731 42954 148 806.60043 BS 40.6 9540.4 55.1 221.3 67.48 731 43465 147 806.60043 BS 40.7 9499.8 55.1 221.3 67.47 731 43976 146 806.60043 BS 40.7 9459.1 55.1 221.3 67.50 732 44487 145 806.60043 BS 40.7 9418.4 55.1 221.3 67.48 732 44998 144 806.60043 BS 40.7 9377.7 55.1 221.3 67.46 732 45510 143 806.60043 BS 40.7 9337.0 55.1 221.3 67.49 733 46022 142 806.60043 BS 40.8 9296.2 55.1 221.3 67.47 733 46534 141 806.60043 BS 40.8 9255.5 55.1 221.3 67.46 734 47046 140 806.60043 BS 40.8 9214.7 55.1 221.3 67.49 734 47559 ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~ROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services No. Centralizer Part Number Type Spcng MD Haie Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ft °I° Ibf Ibf 139 806.60043 BS 40.8 9173.9 55.1 221.3 67.47 734 48071 138 806.60043 BS 40.8 9133.0 55.1 221.3 67.50 734 48584 137 806.60043 BS 40.9 9092.2 55.1 221.3 67.48 735 49098 136 806.60043 BS 40.9 9051.4 55.1 221.3 67.46 735 49611 135 806.60043 BS 40.9 9010.5 55.1 221.3 67.49 736 50125 134 806.60043 BS 40.9 8969.6 55.1 221.3 67.48 736 50639 133 806.60043 BS 41.0 8928.6 55.1 221.3 67.46 736 51153 132 806.60043 BS 41.0 8887.7 55.1 221.3 67.49 737 51668 131 806.60043 BS 41.0 8846.7 55.1 221.3 67.47 737 52183 130 806.60043 BS 41.0 8805.7 55.1 221.3 67.50 737 52698 129 806.60043 BS 41.0 8764.8 55.1 221.3 67.48 737 53213 128 806.60043 BS 41.1 8723.7 55.1 221.3 67.47 738 53728 127 806.60043 BS 41.1 8682.7 55.1 221.3 67.49 738 54244 126 806.60043 BS 41.1 8641.6 55.1 221.3 67.48 739 54760 125 806.60043 BS 41.1 8600.5 55.1 221.3 67.46 739 55277 124 806.60043 BS 41.1 8559.4 55.1 221.3 67.49 739 55793 123 806.60043 BS 41.1 8518.3 55.1 221.3 67.47 740 56310 122 806.60043 BS 41.2 8477.2 55.1 221.3 67.46 740 56827 121 806.60043 BS 41.2 8436.0 55.1 221.3 67.48 741 57345 120 806.60043 BS 41.2 8394.8 55.1 221.3 67.47 741 57862 119 806.60043 BS 41.2 8353.6 55.1 221.3 67.50 741 58380 118 806.60043 BS 41.2 8312.4 55.1 221.3 67.48 741 58898 117 806.60043 BS 41.3 8271.2 55.1 221.3 67.46 742 59416 116 806.60043 BS 41.3 8229.9 55.1 221.3 67.49 742 59935 115 806.60043 BS 41.3 8188.6 55.1 221.3 67.48 743 60453 114 806.60043 BS 41.3 8147.3 55.1 221.3 67.46 743 60973 113 806.60043 BS 41.3 8106.0 55.1 221.3 67.49 743 61492 112 806.60043 BS 41.4 8064.6 55.1 221.3 67.47 744 62012 111 806.60043 BS 41.4 8023.3 55.1 221.3 67.50 744 62531 110 806.60043 BS 41.4 7981.9 55.1 221.3 67.48 744 63051 109 806.60043 BS 41.4 7940.5 55.1 221.3 67.47 745 63572 108 806.60043 BS 41.4 7899.1 55.1 221.3 67.49 745 64092 107 806.60043 BS 41.5 7857.7 55.1 221.3 67.48 745 64613 106 806.60043 BS 41.5 7816.2 55.1 221.3 67.46 746 65134 105 806.60043 BS 41.5 7774.7 55.1 221.3 67.49 746 65656 104 806.60043 BS 41.5 7733.2 55.1 221.3 67.47 747 66177 103 806.60043 BS 41.5 7691.7 55.1 221.3 67.50 747 66699 102 806.60043 BS 41.6 7650.1 55.1 221.3 67.48 747 67221 101 806.60043 BS 41.6 7608.6 55.1 221.3 67.47 748 67743 100 806.60043 BS 41.6 7567.0 55.1 221.3 67.49 748 68266 99 806.60043 BS 41.6 7525.4 55.1 221.3 67.48 748 68789 98 806.60043 BS 41.7 7483.8 55.1 221.3 67.46 749 69312 97 806.60043 BS 41.7 7442.1 55.1 221.3 67.49 749 69835 96 806.60043 BS 41.7 7400.5 55.1 221.3 67.47 749 70359 95 806.60043 BS 41.7 7358.8 55.1 221.3 67.46 750 70883 94 806.60043 BS 41.7 7317.1 55.1 221.3 67.48 750 71407 93 806.60043 BS 41.7 7275.4 55.1 221.3 67.47 751 71932 92 806.60043 BS 41.7 7233.6 55.1 221.3 67.50 751 72456 91 806.60043 BS 41.8 7191.9 55.1 221.3 67.48 751 72981 ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~ROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services No. Centralizer. Part Number Type Spcrtig MD Hole Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ft % Ibf Ib# 90 806.60043 BS 41.8 7150.1 55.1 221.3 67.47 752 73506 89 806.60043 BS 41.8 7108.3 55.1 221.3 67.49 752 74032 88 806.60043 BS 41.8 7066.4 55.1 221.3 67.48 752 74557 87 806.60043 BS 41.9 7024.6 55.1 221.3 67.46 753 75083 86 806.60043 BS 41.9 6982.7 55.1 221.3 67.49 753 75610 85 806.60043 BS 41.9 6940.8 55.1 221.3 67.47 753 76136 84 806.60043 BS 41.9 6898.9 55.1 221.3 67.50 754 76663 83 806.60043 BS 41.9 6857.0 55.1 221.3 67.48 754 77189 82 806.60043 BS 42.0 6815.1 55.1 221.3 67.47 755 77717 81 806.60043 BS 42.0 6773.1 55.1 221.3 67.49 755 78244 80 806.60043 BS 42.0 6731.1 55.1 221.3 67.48 755 78772 79 806.60043 BS 42.0 6689.1 55.1 221.3 67.46 756 79300 78 806.60043 BS 42.0 6647.1 55.1 221.3 67.49 756 79828 77 806.60043 BS 42.1 6605.0 55.1 221.3 67.47 756 80356 76 806.60043 BS 42.1 6563.0 55.1 221.3 67.50 757 80885 75 806.60043 BS 42.1 6520.9 55.1 221.3 67.48 757 81414 74 806.60043 BS 42.1 6478.8 55.1 221.3 67.47 757 81943 73 806.60043 BS 42.1 6436.7 55.1 221.3 67.49 758 82473 72 806.60043 BS 42.2 6394.5 55.1 221.3 67.48 758 83003 71 806.60043 BS 42.2 6352.3 55.1 221.3 67.46 759 83533 70 806.60043 BS 42.2 6310.1 55.1 221.3 67.49 759 84063 69 806.60043 BS 42.2 6267.9 55.1 221.3 67.48 759 84593 68 806.60043 BS 42.3 6225.7 55.1 221.3 67.46 760 85124 67 806.60043 BS 42.3 6183.4 55.1 221.3 67.49 760 85656 66 806.60043 BS 42.3 6141.2 55.1 221.3 67.47 760 86187 65 806.60043 BS 42.3 6098.9 55.1 221.3 67.50 761 86718 64 806.60043 BS 42.3 6056.6 55.1 221.3 67.48 761 87250 63 806.60043 BS 42.4 6014.3 55.1 221.3 67.47 762 87782 62 806.60043 BS 42.4 5971.9 55.1 221.3 67.49 762 88315 61 806.60043 BS 42.4 5929.5 55.1 221.3 67.48 762 88847 60 806.60043 BS 42.4 5887.1 55.1 221.3 67.46 763 89380 59 806.60043 BS 42.4 5844.7 55.1 221.3 67.49 763 89913 58 806.60043 BS 42.5 5802.3 55.1 221.3 67.47 763 90447 57 806.60043 BS 42.5 5759.8 55.1 221.3 67.50 764 90980 56 806.60043 BS 42.5 5717.4 55.1 221.3 67.48 764 91514 55 806.60043 BS 42.5 5674.9 55.1 221.3 67.47 764 92048 54 806.60043 BS 42.5 5632.3 55.1 221.3 67.49 765 92583 53 806.60043 BS 42.6 5589.8 55.1 221.3 67.48 765 93117 52 806.60043 BS 42.6 5547.2 55.1 221.3 67.46 766 93652 51 806.60043 BS 42.6 5504.7 55.1 221.3 67.49 766 94188 50 806.60043 BS 42.6 5462.1 55.1 221.3 67.47 766 94723 49 806.60043 BS 42.6 5419.4 55.1 221.3 67.50 766 95259 48 806.60043 BS 42.7 5376.8 55.1 221.3 67.48 767 95795 47 806.60043 BS 42.7 5334.2 55.1 221.3 67.47 767 96331 46 806.60043 BS 42.7 5291.5 55.1 221.3 67.49 768 96867 45 806.60043 BS 42.7 5248.8 55.1 221.3 67.48 768 97404 44 806.60043 BS 42.8 5206.1 55.1 221.3 67.46 769 97941 43 806.60043 BS 42.8 5163.3 55.1 221.3 67.49 769 98478 42 806.60043 BS 42.8 5120.5 55.1 221.3 67.48 769 99016 ISO 14001 Certified Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services No. Centralizer Part Number Type Spcng MD Hole Dev. Hole Az. Actual SO Rest. Force Casing Ten. ft ff, % Ibf Ibf 41 806.60043 BS 42.8 5077.8 55.1 221.3 67.50 769 99554 40 806.60043 BS 42.8 5035.0 55.1 221.3 67.49 770 100092 39 806.60043 BS 42.9 4992.1 55.1 221.3 67.47 770 100630 38 806.60043 BS 42.9 4949.3 55.1 221.3 67.49 771 101169 37 806.60043 BS 42.9 4906.4 55.1 221.3 67.48 771 101707 36 806.60043 BS 42.9 4863.5 55.1 221.3 67.46 771 102246 35 806.60043 BS 42.9 4820.6 55.1 221.3 67.49 772 102786 34 806.60043 BS 43.0 4777.7 55.1 221.3 67.48 772 103325 33 806.60043 BS 43.0 4734.8 55.1 221.3 67.50 772 103865 32 806.60043 BS 43.0 4691.8 55.1 221.3 67.49 773 104405 31 806.60043 BS 43.0 4648.8 55.1 221.3 67.47 773 104946 30 806.60043 BS 36.7 4605.8 55.1 221.3 66.53 869 105486 29 806.60043 BS 24.7 4569.1 55.1 221.8 66.52 1500 105947 28 806.60043 BS 22.2 4544.4 55.2 223.0 66.50 1824 106256 27 806.60043 BS 22.2 4522.2 55.2 224.1 67.32 1732 106534 26 806.60043 BS 22.2 4500.0 55.3 225.2 67.20 1741 106812 25 806.60043 BS 22.2 4477.8 55.4 226.3 67.08 1752 107088 24 806.60043 BS 22.2 4455.6 55.5 227.3 67.00 1758 107364 23 806.60043 BS 22.2 4433.4 55.6 228.4 66.92 1764 107639 22 806.60043 BS 22.2 4411.2 55.8 229.5 66.83 1771 107913 21 806.60043 BS 22.2 4389.0 55.9 230.5 66.72 1780 108186 20 806.60043 BS 22.2 4366.7 56.1 231.6 66.61 1789 108459 19 806.60043 BS 22.2 4344.5 56.2 232.6 66.52 1797 108730 18 806.60043 BS 22.2 4322.3 56.4 233.7 66.51 1802 108999 17 806.60043 BS 22.1 4300.2 56.5 234.7 66.52 1804 109267 16 806.60043 BS 22.1 4278.1 56.7 235.7 66.52 1807 109534 15 806.60043 BS 22.0 4256.0 56.9 236.8 66.50 1811 109798 14 806.60043 BS 22.0 4234.0 57.0 237.8 66.51 1814 110061 13 806.60043 BS 21.9 4212.0 57.2 238.8 66.51 1818 110322 12 806.60043 BS 21.8 4190.2 57.4 239.9 66.51 1825 110581 11 806.60043 BS 21.7 4168.4 57.6 240.8 66.52 1831 110837 10 806.60043 BS 21.7 4146.7 57.9 241.8 66.51 1834 111089 9 806.60043 BS 21.6 4125.0 58.1 242.8 66.52 1837 111340 8 806.60043 BS 21.5 4103.5 58.4 243.8 66.52 1840 111588 7 806.60043 BS 21.5 4081.9 58.6 244.7 66.52 1844 111834 6 806.60043 BS 21.4 4060.5 58.9 245.7 66.52 1847 112078 5 806.60043 BS 21.4 4039.0 59.1 246.7 66.52 1851 112319 4 806.60043 BS 22.9 4017.7 59.4 247.6 67.50 1719 112558 3 806.60043 BS 40.3 3994.7 59.6 248.4 67.48 1047 112812 2 806.60043 BS 42.6 3954.4 59.6 248.4 67.46 785 113260 1 806.60043 BS 42.6 3911.8 59.6 248.4 67.29 807 113733 3875.0 67.29 3855.0 '"'100.0 0 0.0 ""100.0 0 *BS -Bow Spring, R(S) -Rigid Solid, R(PB) -Rigid Positive Bar ** Default standoff above centralized interval. ISO 14001 Certified Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Simulation Volume and Pressure Results Volume and pressure results calculated at the end of the job. Annulus fluid is heavier than casing fluid by 582 psi. Apply appropriate back pressure on casing if floating equipment does not hold properly. Pumping Schedule -Modified Rates No. Descri tion Densit Rate Volume Duration Ib/ of bpm bbl min 1 10.2 Mud OBM 10.20 5.00 0.00 0.00 2 Dual S acer 12.00 5.00 20.00 4.00 5.00 3 3% Econolite Lead Slurr 11.20 5.00 213.18 42.64 4 Production Tail 15.80 5.00 61.98 12.40 5 10.2 Mud OBM 10.20 5.00 494.14 98.83 If OptiCem-RT will be run during this job, enter this data in the CementJob window and execute the simulator again. Horsepower, Pressure, Freefall Time Liquid Volume In Pump.. Output Surface Pressure. In Surface Pressure Out ECD @ TD ECD @ Frac Zone Free Fafl Height min bbl.. h si si Ib/ al IbI at ft 0.02 0.08 139.4 1124 0 12.33 12.33 0.0 9.02 20.08 132.8 1070 0 12.33 12.33 0.0 29.00 120.00 117.6 945 0 12.33 12.33 0.0 49.00 220.00 105.4 846 0 12.33 12.33 0.0 64.03 295.16 58.0 459 0 12.33 12.33 0.0 81.00 380.00 82.8 661 0 12.33 12.33 0.0 101.00 480.00 82.0 655 0 12.33 12.33 0.0 121.00 580.00 96.9 776 0 12.39 12.39 0.0 141.00 680.00 111.9 898 0 12.43 12.43 0.0 161.00 780.00 200.7 1624 0 13.61 13.61 0.0 162.88 789.30 0.0 2748 0 11.56 11.56 0.0 ISO 14001 Certified Alaska Green Star Certified Brooks Range Petroleum Corporation BROOKS RANGE POLEUM CORPORATION 2007/08Exploration -North Shore # 1 A Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Final Position of Stages Stage Description Annular Len th Casing Len th Annular To MD Casing To MD ft ft ft ft 10.2 Mud OBM 3026.5 0.0 Dual S acer 708.5 3026.5 3% Econolite Lead Slurr 7264.5 3735.0 Production Tail 2000.0 85.0 10999.5 12914.5 10.2 Mud OBM 12914.5 0.0 Final Annular Fluid Density Measured De fh Densit Qualit H drostatic Gradient ft Ib/ al % Ib/ al 0.0 10.20 0.00 10.20 893.1 10.20 0.00 10.20 2672.2 10.20 0.00 10.20 3309.9 12.00 0.00 10.30 3835.0 11.20 0.00 10.43 4420.0 11.20 0.00 10.51 5441.8 11.20 0.00 10.61 7144.7 11.20 0.00 10.73 8847.6 11.20 0.00 10.81 10550.5 11.20 0.00 10.86 11572.3 15.80 0.00 11.10 12999.0 15.80 0.00 11.56 Time of Events Time. Frac Zone ECD Res, Zone ECD Stage Starts Pumping Stage Enters Annulus min Ib/ al lb/ al 0.02 12.33 12.33 2. Dual S acer 9.02 12.33 12.33 3. 3% Econolite Lead Slurr 51.65 12.33 12.33 4. Production Tail 64.05 12.33 12.33 5. 10.2 Mud OBM 105.00 12.33 12.33 2. Dual S acer 109.00 12.36 12.36 3. 3% Econolite Lead Slurr 153.00 12.68 12.68 4. Production Tail 162.87 13.82 13.82 Prior to lu landin 162.88 11.56 11.56 Plu Landed ISO 14001 Certified Alaska Green Star Certified • Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Job Stage Summary -Liquid Volume and Density, Design Shutdown Number Design Volume Actual Valume Design Densit Average Densit Minimum Densit Maximum Densit bbl bbl tb/ al Ib/ al Ib/ al Ib/ al 2 20.00 20.00 12.00 12.00 12.00 12.00 3 213.18 213.18 11.20 11.20 11.20 11.20 4 61.98 61.98 15.80 15.80 15.80 15.80 5 494.14 494.14 10.20 10.20 10.20 10.20 Stage Summary -Pump Pressure and ECD Number Average Pump Pressure Minimum Pump Pressure Maximum Pump Pressure. .Average ECD Minimum ECD Maximum ECD si si si Ib/ al lb/gal Ib/ al 2 1120 1095 1138 11.52 10.31 12.33 3 958 15 1084 12.33 12.33 12.33 4 701 502 847 12.33 12.33 12.33 5 810 474 1700 12.48 11.56 13.82 ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Fluid Positions (graph) OptiCem Fluid Positions at Job End Time = 162.88 min, Volume In = 789.30 bbl 1 Fluids Pumped ~ ~c~.~ r~l~~~i c~~ln~ ~ Duai Spacer ~ 3°/n Econolite Lead Slum. ~ Production Tail llown Hole Depth 1 1 Cas inr Annulus Customer: Brooks Range Petroleum Corporation Job Date: 16-Jan-2008 Sales Order #: Well Description: Tofkat #lA UW1: OptiCem v6.2.4 16-Jan-08 22:43 ISO 14001 Certified ~~ Alaska Green Star Certified 10 12 14 16 15 10 5 0 5 10 15 ZO Density (lb/gal) Diameter (in) BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Circ Pressure & Density - Frac Zone (graph) OptiCem Circulating Pressure and Density at Fracture Zone Downhole Annular Pressure and ECD vs. Li id Volume Circulating Pressure Hydrostatic Pressure ~-. .~ 18 16 ~. 14 12 Fluids Pumped i 0 Dual Spacer 0 3% Econolite Lead Shury ® Production Tail 10.2 Mud OBM s 10 Customer: Brooks Range Petroleum Corporation Job Date: 16-Jan-2008 Sales Order #: Well Description: Tofkat #lA LJWI: OptiCem v6.2.4 16-Jan-08 22:43 ISO 14001 Certified r~ ~; Alaska Green Star Certified 0 100 200 300 400 500 600 7U0 2SUU Volume In (bbl) BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Downhole Pressure Profiles (graph) OptiCem Downhole Pressure Profiles Minimum H drostatic Pressure and Maximum ECD vs. TVD _ Pore Pressure Gradient 1-Fracture Gradient Minimum Hydrostatic Gradient Maximum ECD 200 300( 400( c~ 500( 6001 7001 800 9 0 ~ Previous ~ ing Shoe __ I I ~ - -- ~ _ _ 9 10 11 12 13 14 15 16 ECD (lb/gal) Customer: Brooks Range Petroleum Corporation Job Date: 16-Jan-2008 Sales Order #: Well Description: Tofkat #lA LJWI: 17 18 OptiCem v6.2.4 16-Jan-08 22:43 ISO 14001 Certified ~t~~ Alaska Green Star Certified • BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Final Density & Hydrostatic Profile (graph) OptiCem Final Density and Hydrostatic Profile w____i__ L'1_.:.1 r~,.....;r...,~ HrTo..~...-Arl TlPr~th Density r-. 1 1 1 ~Tv~lrnctritir' (n•;tCliPtlt Customer: Brooks Range Petroleum Corporation Job Date: 16-Jan-2008 Sales Order #: Well Description• Toflcat #lA LJWI: OptiCem v6.2.4 16-Jan-08 22:43 150 14001 Gerntlea ~~~ Alaska Green Star Certified 10 11 12 13 i4 i~ r6 Density/Hydrostatic Gradient (lb/gal) BROOKS RANGE PETROLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A - 7" Production Casing (cont'd) Summary (graph) OptiCem Summary ~r~T ,.~ Q~nn ~* rr'z~il zz~ 11hA~r1 UrPecnra P„mr, Rate and T7Pncity vc 1 .irniiri Vcilnme 16 15 14 ~i 13 ~ 12 +~ 11 ECD Fluid Density Wellhead Pressure Rate I li I I I II l I i I ~I 3 i ® 5 I 10 O 100 200 300 400 500 600 700 Volume In (bbl) -3000 6 -2500 5 ~ -2000 4 ~-. -1500 ~ 3 ~ -1000 ~ 2 -500 1 0 800 Customer: Brooks Range Petroleum Corporation Job Date: 16-Jan-2008 Sales Order #: Well Description: Toflcat #lA LJWI: -0 OptiCem v6.2.4 16-Jan-08 22:43 ISO 14001 Certified Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services BROOKS RANGE PETROLEUM CORPORATION 2007-08 -Exploration Project Alaska; U5A TOFKAT #lA Cement Abandonment Plugs Prepared for: Amjad Chaudhry November 20, 2007 Prepared by: Mark Wedman Halliburton Energy Services 6900 Arctic Blvd. Anchorage, AK 99518 907-275-2610 -office 907-223-5763 -cell HALLIBURTON The Future Is Working Together. ISO 14001 Certified •~ Alaska Green Star Certified BROOKS RANGE P~OLEUM CORPORATION Brooks Range Petroleum Corporation 2007/08Exploration -North Shore #lA Cementing Services Summary of Plugs - Tofkat #1 A Contingency Planning/Assumptions: A number of options exist for plugging the well depending on well construction status at the time of plugging (i.e. production casing set or not) and whether or not the plugging operations are for PTA or Suspension purposes. For purposes of this program, it is assumed the 7" production casing is set and perforated and the well is to be PTA'd.. Plug #1 (Hydrocarbon bearing interval inside 7" production casing ) Downsqueeze method: To reduce WOC time -set 7" 26# EZSV 50' above top perforation. Sting in and downsqueeze with a cement volume equivalent to fill cement from EZSV to 100' below the lowermost perforation. Unsting from EZSV and lay in 50' of cement slurry on top of EZSV. POOH several joints and pressure test EZSV (1,500 psig or 0.25 psi/ft multiplied by TVD, whichever is greater). POOH to surface casing shoe. Plug #2 (9-5/8" Casing Shoe Depth inside 7" 26#/ft casing) Displacement or Balanced Plug method: 100' of cement below the 9-5/8" casing setting depth to 100' above 9-5/8" casing setting depth inside 7" 26#/ft casing.: Plug #3 (Surface 9-5/8" 40#/ft casing and 7" 26#/ft casing) Displacement or Balanced Plug method:: With 7" casing cut and retrieved at 105' Seta 200' balanced plug from 100' inside the 7" casing stub and 100' above the 7" stub inside 9-5/8" casing with top of cement no less than 5' below surface. Plug #1: Downsqueeze method (Hydrocarbon bearing interval) 7" 26# EZSV set 50' above top perforation. Downsqueeze with a cement volume equivalent to fill cement from EZSV to 100' below the lowermost perforation + 50' of cement slurry on top of EZSV. For planning purposes -length of plug inside 7" 26#/ft casing is assumed to be 500'. Actual cement volume will depend on conditions at the time of plugging. Plug Slurry: 19.1 bbls - 94 sks. Premium Cement+ 0.4% Halad-344 (Fluid Loss Additive), + .2% CFR- 3 (Friction Reducer), + 0.1% HR-5 (Retarder) or as required Density (ppg) Yield (cu ft / sk) Water requirements (gal/sk) Fluid Loss (cc/30 min.) Free Water % Thickening Time Hr: min. Compressive Strength -PSI 12 hr (est.) 24 hr (est.) ~w Plug Slurry 15.8 1.15 5.00 <100 0 +/- 3:00 >700 @ 130 °F >1,200 @ 130°F ISO 14001 Certified Alaska Green Star Certified • Brooks Range Petroleum Corporation BROOKS RANGE P~OLEUM CORPORATION 2007/08Exploration -North Shore #lA Cementing Services Tofkat #1 A Abandonment Plugs {cont'd) Plug #2: Displacement or Balanced Plug method (9-5/8" Casing Shoe Depth inside 7" 26#/ft casing) Place a balanced plug from 100' below the 9-5/8" casing setting depth to 100' above 9-5/8" casing setting dept inside 7" 26#/ft casing. Plug Slurry: 7.6 bbls -39 Sks. Premium Cement + 1% Calcium Chloride PZuQ Slurry Density (ppg) 15.8 Yield (cu ft / sk) 1.15 Water requirements (gaUsk) 5.00 Thickening Time Hr: min. 3:00 Compressive Strength -PSI 12 hr (est.) 1650 24 hr (est.) 1800 Plug #3: Displacement or Balanced Plug method (Surface 9-5/8" 40#/ft & 7" 26#/ft casing) Displacement or Balanced Plug method:: With 7" casing cut and retrieved at 105' Seta 200' balanced plug from 100' inside the 7" casing stub and 100' above the 7" stub inside 9-5/8" 40#/ft casing with top of cement no less than 5' below surface (5' to 205'). Plug Slurry: 11.4 bbls. - 68 Sks. Type C Permafrost Density (ppg) Yield (cu ft / sk) Water requirements (gal/sk) Fluid Loss (cc/30 min.) Thickening Time Hr: min. Compressive Strength -PSI Type C Permafrost 15.6 .95 3.75 >250 +/- 2:30 12 hr >500 @ 40 °F 24 hr >1,150 @ 40 °F ISO 14001 Certified Alaska Green Star Certified Page 1 of 1 ~ ~ Maunder, Thomas E {DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, February 27, 2008 2:47 PM To: 'Bill Penrose' Subject: RE: Tofkat #1A Bill, I don't think anything further will be needed. As we discussed, the requirement will be to cover significant hydrocarbons as usual. Tom Maunder, PE AOGCC From: Bill Penrose [maiito:bill@fairweather.com] Sent: Wednesday, February 27, 2008 2:43 PM To: Maunder, Thomas E (DOA) Subject: RE: Tofkat #1A Tom, Thanks for catching that. We'll plan to bring the 7" cement up short of the 9-518" shoe in order to allow us to pump freeze-protect fluid down the 7" x 9-5/8" annulus far enough to cover the permafrost. Please let me know if you'd like a modified cement program. The formulations would remain the same, but the lead volume would be reduced. Regards, Vice President /Drilling Manager Fairweather E&P Services, Inc. 2000 East 88th Ave., Suite 200 Anchorage, Alaska 99507 907-258-3446 From: Maunder, Thomas E {DOA) [mailtoaom.maunder@alaska.gov] Sent: Wednesday, February 27, 2008 11:56 AM To: Bill Penrose Subject: Tofkat # lA Bill, A follow-up to our conversation ... Is it intended to cement the 7" up into the 9-5/8" shoe? If the well is successful and not P&Aed, how will you freeze protect the 9-5/8" x 7" annulus? Look forward to your reply. Tom Maunder, PE AOGCC 2/27/2008 ~ ~ TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~'=~-7- ~/~ PTD# _ 2~~ -- d Zy Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: POOL: Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. ,API No. 50- API number - - are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and AP[ number (50- - -_~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in // SA)~PLE / ~{ r-e`~ no greater than 30' sample intervals from below the permafrost or ' ~'t/~ s ~ x. '" from where samples are first caught and 10' sam le intervals P 4 ' throu h tar et zones. Non- onven` igna Well O~' bo"~' Please note the following special condition of this permit: ~ ~ production or production testing of coal bed methane is not allowed 2 for (name of well) until after (Company Name) has designed and ~•Z implemented a water well testing program to provide baseline data on water quality and quantity. _(Comaanv Namel must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/11/2008 WELL PERMIT CHECKLIST Field & Pool _ _ _ PTD#:2080280 Company BROOKS RANGE PETROLEUM Initial ClasslType Well Name: TOFKAT 1A __ Program EXP _ Well bore seg EXP! UN GeoArea 890 _____ Unit 9949 On/Off Shore On Annular Disposal Administration 1 Pe[mit.fee attached NA 2 Lease number appropriate- - - - - - - - - - - - - - - - - - - - - - Yes - - - _ _ Kick off point in A_DL 391014; top prod inierval_& TD in__ADL 39067ti.- - - _ _ _ _ _ _ - . - - - - - _ _ - - _ 3 Uniquewellname and numbe[ . - . Yes 4 Well located in-a_definedpool- No- - - Exploratorywell_ 5 Well located proper distance_from drilling unit_boundary_ _ .. Yes - - - - - - - - - - - - - - - - - - - - - - -- - - 6 Well located proper distance from other wells- - Yes ~7 Sufficient acreage_ayailablein_dril_lingranit------------- -- --------------- Yes-_ _______.---__-__--__ ~8 Ifdeyiated,is_we_Ilboreplat_included--------------------------_. -.--- Yes_- ___ i9 Operator only affected party - .. - - - Yes 317108: Received Designation_ of operator_forms for ADL 391.014 and_ADL-390676. 110 Operator has-appropriafe. bond in force Yes i 11 Pefmit_can be issued without conservation order_ _ _ - . - _ - - - - - - - - - - - - - - - - - Yes _ _ _ . _ - - . _ Appr Date 112 Permit_can be issued without administrative_approya_I - - - - Yes 13 ~' Can permit be approved before 15-day wait_ _ _ Yes - _ - - - _ _ SFD 3/8/2008 I 14 Well located within area and strata authorized by Infection Orde[# (put IO# m_c_omments)-(For NA- 15 All wells within 1!4_mile area of review identified (For service well only) _ _ _ _ _ _ _ NA- - - - - - - - - - - - - - - - - - - - - - - - - - 16 Pre-produced injector_ duration of pre production less. than_ 3 months_ (For service well only) NA_ - _ - - 17 Nonconyen, gas conforms to AS31,05,030([.1_.A),(j.2.A-D) NA_ _ - _ . . - _ _ _ _ _ _ _ - . - - - - - _ x,18 Conductor string-provided _ _ NA_ _ . - - - . _ Conductorsetin Tofkat #1 (207-173)._ Engineering ',19 Surface casing_protects all-known USDWS . - . - - - - - - NA_ - - Surface rasing set in Tofkat #1 @ 3000'. . ~~,20 CMT_vol_adequate_to ciCCUI_ale-on conductor_& surf.csg - NA_ _ - Surface rasing set in_Tofkat #1. '21 CMT_v_ol_ adequ_ate-to tie-in long string to surf csg_ _ - No- - - - - - - .. _ - - - - - - - - - - - - - . ',22 CMT-will coverall known_productiye horizons_ - Yes - - - - - - - - . 23 Casing designs adequate f_or G, T B &_permafrost_ _ _ _ _ _ - Yes _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ 24 Adequate tankage-or reserve pit .. - . - - - - Yes Rig equipped with steel pits: No reserve pit planned._ All waste-tp approved disposal wells. - 25 If a-re-drill, has-a 10-403 for abandonment been approved No_ Well still drilling, Sundry to abandon Tofkat #1 will be submitted.- - 26 Adequate wellbore separation proposed- . - - Yes - Nearest segment is plugged portion of Tofkat #1 and_paths diverge. - - - ~27 -If diveder required, does it meet regulations_ _ _ _ _ _ _ _ _ _ - NA _ _ - BOP Stack_will already_be_in place, . Appr Date ~i28 Drillingfluid_program schematic_&_equip list adequate_ Yes - Maximum expected formation pressure 10,2 EMW._ Planned MW up to 10.5ppg. TEM 2!2712008 29 BOPEs, dothey meetregulation - _ _ _ _ _ _ _ _ _ .. - - - - - _ Yes _ _ . - . - - - 30 BOPE_press rating appropriate; test to (put psig m comments) _ Yes MASP calculated at 3447 psi, 5000 psi BOP testplanned, _ _ 31 Choke_manifold complies wIAPI_ RP-53 (May 84} Yes - - 132 Work will occur without operation shutdown_ - _ . . - Yes - - - - -Well may be_suspended-following testing. 1133 Is presence of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ - - H2S has not_been seen in-the area. _ Rig has_sensors and alamis. _ - _ _ _ _ _ _ . _ - . - - - - _ - _ _ - - - - - - 34 Mechanical condition of wells within AOR yerrfied (For service well onlya NA_ - _ 35 Permitsan be issued w/o-hydrogen_sulfide measures - - _ Yes . - - - - _ _ H2S is not_expected, but riq has sensors _ _ - - - . - _ _ _ _ Geology !,36 Dala_presented on potential overpressure zones_ - - _ _ - - _ - . - - - - . - - - Yes _ _ - - _ _ Expected pressure is 10,2-ppg EMW__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ - --------------------- Appr Date 137 Seismic-analysis of shallow gas_zones NA_ _ _ - - - SFD 3/4/2008 ~I38 Seabed condition suruey.(if off-shore} NA_ _ . - '~39 Contact name/phone for weekly progres3 reports_ [exploratory only] Yes Jim Winegarner907-865-5804. Geologic Engineering Date: Date is Date Commissio r: Commissioner: mmis n iNell History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special eNort has been made to chronologically organize this category of information. :, I '.. Sperry Drilling Services Brooks Range Petroleum Corporation Tofkat 1 Tofkat 1 A, and Tofkat 1 B a~ .~ - l 7 3 ~ ~ ~3 - c.,~t ~, u ~ -~ C y~ Surface Data Logging END OF WELL REPORT Brooks Range Petroleum TABLE OF CONTENTS TOFKAT 1, 1A, and 1 B. Tofkat 1 Tofkat 1 A Tofkat 1 B 1. General Information 2. Daily Summary A. Bit Reports B. Mud Reports C. Show Reports 3. Lithology Summary A. Tops. B. Logs C. Tops. D. Logs E. Tops F. Logs 4. DATA CD. 5. Morning Report Brooks Range Petroleum Sperry Drilling Services GENERAL WELL INFORMATION TOFKAT 1 Company: Brooks Range Petroleum Corporation Rig: Nabors 27E Well: Toflcat 1 Field: Exploration Borough: North Slope State: Alaska Country: United States API Number: 50-103-20567-00 Sperry-Sun Job Number: AK-AM-0005672885 Job Start Date: FEB 08 2008 Job End Date (TD): March 18 2008 Total Depth: TD 13174' MD; 7708' TVD North Reference: True Declination: 22.30° Dip Angle: 80.64° Total Field Strength: 1151:50 NT Date Of Magnetic Data: 16 Feb 2008 Wellhead Coordinates N: North 70° 13' 48.186" Wellhead Coordinates W: West 150° 47' 20.701 " RKB: 33' Ground Elevation: 19.80321' SDL Engineers: Steven Jenkins; Ian Johnstone, Ed Jones Company Geologist: Doug Hastings SSDS Unit Number: 115 Brooks Range Petroleu m 1~~4LLi~~JR~'Ci Sperry Drilling services GENERAL WELL INFORMATION TOFKAT1A Company: Rig: Well: Field: Borough: State: Country: API Number: Sperry-Sun Job Number: Job Start Date: Job End Date (TD): Total Depth: North Reference: Declination: Dip Angler Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W: RKB: Ground Elevation: SDL Engineers: Company Geologist: SSDS Unit Number: ~ !'O O ~S Brooks Range Petroleum Corporation Nabors 27E Tofkat 1 A Exploration North Slope Alaska United States 50-103-20567-01 AK-AM-0005672885 March 19 2008 March 26, 2008 TD 11298' MD; 7169' TVD True 22.30° 80.64° 1151.50 NT 16 Feb 2008 North 70° 13' 48.186" West 150° 47' 20.701 " 33' 19.80321' Steven Jenkins, Ed Jones Doug Hastings 115 ;~~ .~:._ Sperry Drilling Services GENERAL WELL IIVFORMATIOIV TOFKAT1B Company: Rig: Well: Field: Borough: State: Country: API Number: Sperry-Sun Job Number: Job Start Date: Job End Date (TD): Total Depth: North Reference: Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W: RKB: Ground Elevation: SDL Engineers: Brooks Range Petroleum Corporation Nabors 27E Tofkat 1 B Exploration North Slope Alaska United States 50-103-20567-02 AK-AM-0005672885 March 27 2008 April 10 , 2008 TD 15575' MD; 7199.46' TVD True 22.30° 80.64° 1151.50 NT 16 Feb 2008 North 70° 13' 48.186" West 150° 47' 20.701 " 33' 19.80321' Steven Jenkins, Ed Jones Company Geologist: SSDS Unit Number: Doug Hastings 115 Sperry Drilling Services DAILY SUMMARY Brooks Range Petroleum Corporation Totkat 1, Totkat lA, and Tofkat 1B 2_ DAILY SUMMARY TOFKAT 1 12 Feb 2008 Cont to rig up to spud. Picked up 129 joints of drill pipe. Clear rig floor, P/U BHA.RIH and tag bottom of conductor and started drilling. Drilled 300', POOH to P/U jars and heavy wall. RIH and drill to 826 feet. 13 Feb 2008 Drilled to 1204' POH to 180' and monitored well. Hole in good condition. RIH washing down last 95' with 2' fill on bottom. Drilled ahead and 50 to 150 feet/hr. ROP. Drilled to 2059' sliding 30 to 40' per stand and rotating the rest. ROP slowed, so two NutPlug sweeps were run with little or no ROP improvement seen. 14 Feb 2008 Drill 2059' to 2166' C~ 50 to 150 ft/hr. Circ. B/U. POH to 1011'. Good displacement No problems. Monitored well. Static. POH to 89.19' and racked back. No problems. Mud caked on stabilizers, tools and bit. Bit was damaged. Cleaned BHA. RIH new bit to 275'. Serviced top drive. RIH to 2070' then WTB with no fill. Drilled to 2557' with initial ROP ~ 30 to 70 ft/hr in clays 15 Feb 2008 Drilled to TD surface hole interval and 3910'. Circ. B/U. B/U and 3900' should be 5050 strokes at gauge hole or 5600 strokes at the 10% over gauge factored in for whole volumes to date. 16 Feb 2008 Short trip from interval TD of 3910.4' up to 2100'. Hole in good shape. Swept hole with NutPlug to try and gauge enlargement unsuccessfully as NutPlug arrived 200 strokes early;(Probably channeled along high side of pipe)? Pumped dry job and POOH. L/D BHA. Rigged to run 9 5/8" casing. Started to RIH with casing. 17 Feb 2008 Casing ran smoothly. Landed it at 3897 feetMD;(3026.7 feet TVD) with no problem. Cemented. Waiting on cement. Cleaned pits to get ready for oil mud section. 18 Feb 2008 Waiting on cement. 19 Feb 2008 Pressure test & nipple up BOP's. M/U test joint & set test plug. Make up BHA &RIH to tag cement C 3805'. Set down 10K. Drill cement to 3812' &circ. B/U. Test 9 5/8 casing with 3000 psi for 10 minutes. Good Test. Drill float collar & cement to 3840 feetMD. 20 Feb 2008 Drilling cement & shoe C 3897' and open hole to 3911'. Circ. mud & pump 25 bbl spacer followed by oil mud. Circulate. Pump dry job & POH for smart tools. P/U & load BHA. Load nukes into tool. RIH with DC & HWDP to 1053'. Test MWD tool. Blow down Top-drive. P/U singles of DP to 3894'. Drill to 3931'. Circ. B/U C~ 500 gpm and 3800 psi. Leak off test. Formation leak off ~ 820 psi=15.3 PPG EMW. 21 Feb Drilled to 4898'[440 gpm ~ 3800 psi; 2-10K WOB. Rotating wt=100K]. Circ. B/U for trip to shoe. No trip problems. Drilled to 5860';[up wt. 145K:dwn wt.100K:Rot wt. 115K:WOB=&12]. Circ.460 gpm X3680 off btm; 3950 on btm; Circ. 1.5 x B/U. POH to 4897'. Tight out C~ 5250,5080,4900. RIH to 5860' WTB f/5760'. No problems. (1000 units connection gas @6000' after trip). 22 Feb Drill f/6100-6822'. Circ. 455 gpm ~ 3890 psi off btm & 4050 psi on btm. Pump sweep. POH tight C~1 6305'. Work up to 6250' pulling 50K over.Break circ. & POH to 6147'. Evidence of packing off. RIH to btm &circ. 90 minutes. POH. Tight ~ 6110' but worked through it. Monitored well ~ 5764'. RIH to btm with no problem. Drilled to 7785'.Circ.C~ 445 gpm C~ 3880 psi off btm & 4100 psi on btm. ROP=200-250'/hr. DAILY SUMMARY Brooks Range Tofkat 1,Tofkat 1 A, and Totkat 1B 23 Feb Circ. sweep. & 3 B/U. Pump dry job. POH to 6053' with tight spots worked easily, though tight C 6250'MD. RIH to btm with no problem washing 100'. No fill. Drill to 8747'; [Torque on 6- 7K/off 5-6K;up wt 190K:dwn wt. 110K:Rotating wt. 135K:445 gpmC~3880 psi]. Circ. sweep. POH to 7688'; 20-30K drag after 8100'.Work & comes slick.RlH with no problem. Drilled to 8940'. 24 Feb Drilled to 10,092';[WOB 8-10K,TQ on 8K,TQ off 6-7K,420 gpm @ 3900 psi,Up wt. 225K,Down wt. 150K,Rotating wt. 120K.Circ. sweep @ 430 gpm CAP 4000 psi. POH to 8450' laying down 4" DP. Working tight @ 8450' pulled 30,000 over to free. Continue POH. [ROP average =142.29] 25 Feb POH tight C~ 8743'[up wt. 195K:dwn wt. 110K]. POH f/8459 to 7200' but pipe wet. Pump dry job. POH. Tight f/6300 to 6000'. Pipe wet. Circ. out pills with 4000 strokes. POH to 1000' using SuperSucker to clean OBM from joints and working pipe to keep slug falling. UD HWDP & jars. Remove nuclear source. 26 Feb Completed laying down all 4" drill pipe. Clear/clean rig floor. Rack and talley 5" drill pipe. RIH picking up 111 joints 5" drill pipe. POH, standing back 5" drill pipe in the derrick. Test BOP. No fluid treatments today. Hole taking proper fill while laying down and picking up drill pipe. No losses. 27 Feb Finish testing BOP, Koomey test OK. Pull test plug set, wear bush lock down, blow down choke and kill line, PU BHA, circulate to check MWD tools, RIH w/5" DP, circulated at the shoe, cut and slip drill line, service top drive, cont. RIH. Monitoring while tripping back in the hole with 5" DP. 28 Feb Cont RIH w/ 5" DP, circulate and condition tight hole, PU 5" to 7815', circulate, PU 5" DP to 8625', circulate, PU 5" DP to 8761', Cont RIH, wash and ream, drill ahead from 10092' to 10603'. Monitoring while tripping back in the hole with 5" DP. Running centrifuges at all times while drilling and circulating to maintain proper weight. Encountered many "sticky" spots while running in, especially around 6000'-6300'. Circulating in these spots brings sand across the shakers. 29 Feb Drilling ahead, circulate to clean hole, short trip of 11 stands, break circulation, ream last stand, continue drilling ahead, swab out of #1 mud pump, rotate and slide. Running centrifuges as needed while drilling. 243 bbls of fluid lost yesterday, built some fluid on the rig and ordered 290 bbls flmud plant to make it to TD w/sufficient volume of fluid in the pits. 1 Mar Cont drilling ahead to 12050', circulate BU for short trip, continue drilling to 12415', rot and slide to 12630', control drill to 12698', clean suction screens both pumps, continue drilling ahead to 12794', change swab and pulsation dampners in pumps. Maintain volume, weight, and rheological properties specified in the well program. Centrifuge's have been down due to mechanical problems. No reported losses to the formation. 2 Mar Circulating while working on #2 pump to change pulsation dampner and swabs. Trouble shoot MWD tool, MAD Pass, control drilling, 12793' to 13174'. Circulate and pumped a Hi Vis Weighted sweep. Observed well. Pumped a dry job, short trip, circulate 3 BU, observed the well. Pumped a dry job, and POOH. Pumped a 20 Bbl Hi Vis Weighted sweep. Circulated 3 BU for cleaning hole. Pumped 20 Bbl dry job, and POOH. No reported losses to the formation. 3 Mar POOH, UD BHA, RU wire line scheves, PU logging tools, RU to log the well. No losses to the formation while tripping out of the hole, The well is TD'd at 13,174'. The rig crew is currently working on the mud pumps and will be performing maintenance and repair on the equipment in the pits over the next few days as the well is logged. DAILY SUMMARY Brooks Range Totkat l,Tofkat 1 A, and Tofkat IB 4 Mar Logging Well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. 5 Mar Logging Well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Prepared two dry jobs for POOH while logging Monitoring the well for gas while logging well. 6 Mar Logging the well, Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Ordered additional mud products in preparation for drilling the sidetrack. MI Wate used for dry jobs. Centrifuged pits 3-7 until desired mud weight was achieved. Monitoring the well for gas. 7 Mar Logging Weli from 10,000' to TD on drill pipe. Rig crews will be performing maintenance and repair on the equipment in the pits as the well is logged. Centrifuge's up and running, processing fluid as circulating allows to maintain 10.7 ppg mud. Centrifuge #2 had a broken dial and bent trigger which was repaired by the rig electrician. Prepared a dry job. Monitoring the well for Gas. 8 Mar Logged from 10,100' to TD and back. POOH to remove the side entry sub from the string. Ran back in to 12,100' and circulated 8,100 strokes to condition mud. Built a 20 bbl dry job weighing 12.7 ppg and pumped it before tripping out of the hole. Stopped POOH at 4752' to slip and cut drilling line. After sonic logging was completed, the crew pulled the side entry sub out of the string and ran back to 12,100' and circulated 8000 strokes, or one complete surface to surface volume. The mud weight is now 10.7-10.8ppg all the way around. The centrifuge ran flawlessly the entire time. MI Wate used to make a 20 bbl dry job weighing 12.7ppg. 9 Mar Cont cut and slip drilling line, POOH, LD logging tools, PU logging tools, RIH, every ten stands pumping 3 bpm for a total of ten barrels each time. At 10,189', stopped and circulated drill pipe volume per Schlumberger. MDT logging. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Monitoring well for gas. 10 Mar Cont MDT logging to 11963, POOH to 11100, cont logging to 10189, Built dry job to POOH. Maintaining mud weight at 10.7 -10.8 ppg. Adding MI Wate and running centrifuge as needed. Occasional slugs built as needed for logging. Built a 2 ppb over dry job to POOH. 11 Mar Gathering MDT log's on drill pipe all day. Monitoring the well for gas. 12 Mar Logged with Schlumberger. Tested BOP's. RIH with 2 7/8" stinger tubing on end of drill- pipe to begin cementing plugs. Circ. B/U halfway in. Will RIH to 12,350 feet and spot 25 bbl, viscous HRP pill by pumping 2335 strokes to clear pill through mule shoe, then slowly pull up to 12,050 feet and circulate prior to cementing Stage 1 plug. 13 Mar RIH f/6146' to 12350' with no problems. Circ. B/U CS spotted 25 bbl. viscous pill. POH to 12044' & rigged up cementers while circulating/conditioning mud. Placed two 82 bbl. cement plugs. Circ. B/U before pumping dry job & POH. Dry job unsuccessful. POH 'wet' from 9853'. Pumped 2nd dry job. Unsuccessful. POH 'wet'. Pumped viscous OBM/HRP pill. Added M-I Wate for two dry jobs. 14 Mar POH 'wet' f/3859'. L/D 2 7/8" pipe;(lots of cement on pipe). MN clean out BHA &RIH tagging cement ~ 9950'. Set down with 20K weight. Circ. hole clean. POH to 845';(hole in good shape). Change out BHA to cement stinger on 2 7/8" drill-pipe. Prepare to RIH to spot 25 bbl. viscous pill and 46 bbl. cement plug. DAILY SUMMARY Brooks Range Tofkat 1,Totkat 1 A, and Tofkat 1B Added M-I Wate for two dry jobs. No other treatment today. Plan Forward: Will RIH to 6660' and spot 25 bbl. viscous pill using 1326 total strokes. Will POH to 6360', and then circulate B/U of 3318 strokes. Halliburton will cement isolation plug from 6360' up to 5860'. 15 Mar RIH & spot high-viscosity pill @ 6660'. POH to 6360 & rig up cementers. Pump 15 bbl spacer; 46 bbl. 15.8 ppg cement; & chase with 15 bbl. spacer. Spotted cement C~ 6360'. POH to 5383' & circulate hole clean. Pumped dry job. POH & P/U polishing assembly. RIH to 5695'. 16 Mar Wash down looking for cement plug f/5695'-6550'. No indication? Circ. & clean hole. Green cement @ B/U. Pump dry job & POH. Change BHA to cementing stinger. RIH to 6660'. Spot 15 bbl. viscous pill. POH to 6360'. Circ. hole clean. Pump 15 bbl spacer; then 51 bbl. cement; then 5 bbi spacer; then rig mud. 89 bbl. total displacement. M-I Wate used for dry job. No otherr treatment today. 17 Mar POH. Rig Service & Slip & Cut for 2.5 hrs. UD cementing BHA & P/U polishing BHA. RIH to 5300'. Wash down 586' looking for cement;[none found]. Circ. & condition mud. WOC. Wash down to tag firm cement @ 6153'. Circ. B/U. Pump dry job & POH. 18 Mar Contunue to POH & UD cement polishing BHA. P/U cementing BHA. RIH to 6065' & WASH TO 6146'. Circulate while rigging up cementers. Top cement isolation plug. POH to 5194'. Drop ball & circulate DP volume. POH to 4718'. Spot 25 bbl. viscous pill @ 4718'. POH to 4400'. Rig in cementers and cement shoe plug. POH to 3450'. Drop DP wiper ball & circulate. Pump dry job & POH. Added M-1 Wate for dry job, and added 20 Citric Acid to cement rinsate vacuum tanker to lower pH to 10.5 for acceptance at Class I Pad 3 Disposal facility. Tofkat 1 A 19 Mar Side track well TOFKAT 1 A . POH f/3450'-1053' & UD 2 7/8" DP. Pull wear ring. M/U test joint. Install test plug. Test BOP's. Load nuclear source in smart tools & orient tools before RIH. 20 Mar Make up BHA &RIH. Shallow test tools. Okay. RIH to 3684 & wash in to 4447' to try & tag cement;(not found). Circulate to balance mud. Pump dry job & POH. Lay down smart tools. P/U cementing stinger assembly &RIH to 4587'. Circulate clean. Spot a 25 bbl. 16 ppg viscous spacer. POH to 4302 & cement with 15 bbl. spacer; 26 bbl. 15.8 ppg cement; & chase with 5 bbl. spacer and rig mud. POH to 3350'. Circulate 2 x B/U. Pump dry job & POH. 21 Mar POH F/3350' & UD cementing BHA & 2 7/8 DP. M/U smart BHA & load source. RIH to 1120'; shallow test tools, then WOC. RIH to 3589' & wash to 3970'. Direction work f/3940'-3970'. Time drill to 4732'MD / 3464' TVD; [ 550 gpm C 2600 psi; Tq on 5-6K; Tq off 4-5K; Up wt. 140K; Down wt. 115K; Rotary wt. 110K]. 22 Mar Circ. B/U before short trip out to shoe. Some swab noted f/4447-4225'. Work pipe thru okay to 3875'. Orient tools. RIH washing/reaming last stand to btm. Drilled to 5780' backreaming twice. POH to 5494'. Hole in good shape. RIH with no problem. Drill with one pump to 6067'. 23 Mar Rotate/slide f/6,066-6732'. Circ. B/U. Monitor well. Pump dry job. POH to 4,700'. RIH to 6,542' & wash/ream to btm. Drill to 7,715'. [540 gpm ~ 2950 psi; up wt. 190K,dwn wt. 125K, rot. wt. 145K; Tq on 7-8K,Tq off 5-6K. 24 Mar Monitor well. Short trip f/7778-7497'. Hole was slick. Reamed last stand in to 7778' and oriented tools. Slide & rotate to 8630'. Drilled to 8726'. Circ. hole clean. Pump dry job. POH to 6454'. First 1000' 15 to 30 K overpull. Clean. Rest went well. RIH to 8630'. Wash & ream to btm. Drill to 9366';[530 gpm@2800psi;Tq on 10-11K;Tq off 8-9K; Up wt. 225K; dwn wt. 135K; rot. wt. 160K]. 4 DAILY SUMMARY Brooks Range Tofkat 1, Tofkat lA, and Tofkat 1B 25 Mar Rotate and slide from 9366' to 10536'. Drill ahead to TD 11297'. Back ream stand, MWD working with tool, MWD survey, Circulated 2+ BU until hole was clean. Observed the well, pumped a 20 Bbl Dry job, POOH from 11297' to 8345'. RIH with BOP test. 26 Mar Cont POOH, LD BHA, Test BOPE, RIH to 3750', Slip and Cut drilling line. TOFKAT 1 B 27 Mar Cont servicing the rig, TIH, wash and recipricate, displace well to WBM, POOH, circulated to condition mud. A total of 870 bbls were recovered from the well bore and are currently on location. 28 Mar Cont to condition mud, pump a dry job, POOH, rig up for 2 7/8 tubing, RIH, circulated and spotted the weighted vicuous pill, rig up for cement job, set cement plug, POOH, LD drill pipe, rig down 2 7/8 tubing, waiting for the cement to dry. Prepared for the cement plug job. Built a 25 Bbl, weighted (15.8) viscuous pill. Built a 20 Bbl dry job to POOH. Preparing for the WBM displacement. New well/sidetrack starts tomorrow. 29 Mar TIH, tagged hard cement at 3595'. Displaced 10.0 ppg WBM with 10.0 ppg OBM. Test BOPE. PU BHA, RIH. Ran in the hole to top of cement, it held 20k in compression, everything OK. Displaced well to OBM that was recycled from last well. Pumped a High Vis 50 bbl WBM pill, followed by a 50 bbl high vis OBM pill. Then it was chased around by 870 bbis of OBM that we saved on location. Pits 1, 2, and the pill were cleaned prior to taking on remainder of OBM as they had been contaminated w/WBM. LVT brought out to store in pit 1. 30 Mar Pick up ghost reamer, test WMD toots, TIH, Drill ahead, Circulate 1 BU, pump dry job, short trip. Treating and maintaining the OBM with LVT, VersaWet, VersaCoat, Lime, IMG-400, and CaCI. Running centrifuges continuously while drilling ahead. Driller circulated 1 BU at 5500'. Built a dry job, and POOH for a short trip. 31 Mar Cont short trip, service top drive, TIH, circulate to clean the hole, rotate and slide to 7697'. Maintaining the OBM with LVT, VersaWet, VersaCoat, Lime, IMG-400, Versatrol, Soltex, and CaCI. Running centrifuges continuously while drilling ahead. After short trip, the hole unloaded. At 6,330' and 7,100' a 25 bbl Hi Vis sweep was pumped with excellent results as torque and drag decreased after. Pumped a 25 Bbl Hi Vis sweep at 7350' with a medium return of cuttings. Cost reflects 290 Bbls of new OBM and 150 Bbis of new LVT. 1 April Cont. drilling ahead, pumped 25 Bbls Hi Vis sweep, short trip, drilled ahead, pumped 25 Bbls Hi Vis sweep to clean hole, drilling ahead. Drill into the Qannik. 2 Aprit Drilled ahead, pumped 25 Bbl Hi Vis sweeps at 9000' and 9500', short tripped, drilled ahead, pumped 25 Bbls Hi Vis sweeps at 10,000' and 10,500'. Drilled ahead. Experienced fluid losses of approx 25 Bbls per hour. Pumped 50 Bbl LCM Pill, monitoring the well. 3 April Cont monitoring well. Adding LCM to mud due to last night's fluid losses. Drilled ahead. Pumped a 25 bbl Hi Vis Sweep w/ LCM at 11,059'. Short trip to 9492'. Drilled ahead. Pumped another 25 Bbl Hi Vis sweep at 11,875'. Drilled ahead to 12,142'. DAILY SUMMARY Brooks Range Totkat I,Totkat 1 A, and Tofkat IB 4 April Drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead, circulated another 25 Bbl Hi Vis sweep C 13,200', short tripped, serviced blocks, PU drill pipe, TIH, drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead to 13,581'. 5 April Drilled ahead, POH to rebuild wash pipe, RIH, Drilled ahead, pumped a 25 Bbl Hi Vis sweep, drilled ahead to 14814'. Centrifuges down since midnight, working on them. Pumped 25 Bbt Hi Vis sweep for hole cleaning. Costs reflect 290 Bbls of new LVT, and 580 Bbls of new OBM delivered on 4/2 and 4/3. 6 April Drilled ahead, pumped a 25 Bbl Hi Vis sweep at 15,300', drilled ahead, pumped a 25 Bbl Hi Vis sweep at 15,575 at T.D., and circulated the hole clean. Pumped a dry job, POOH. Cut and slip drilling line and serviced the draw works. Continuing to POOH. 7 April Cont POOH, LD BHA, Test ROPE, Rig up and run wireline. Monitoring well for losses while logging. 8 April Logging the well with Schlumberger wireline on drill pipe. Monitoring well for losses while logging. ~~~~~~~~~~ WELL NAME: Totkat 1, IA, and IB. LOCATION: Coleville River OPERATOR: Brooks Range Petroleum AREA: ExPloration,Nuisgsut CONTRACTOR: Nabors 27 E STATE: Alaska Sperry Drilling Services BIT RECORD BHA Bit Bit Bit De th D th F # # Type Size p IN ep OUT ootage Bit Hours TFA AVG ROP WOB RPM PUMP Press PUMP GPM Bit Grade Remarks 1 1 Mill Tooth Bit 12.25 113 2166 2053 22.3 0.942 92.1 t 5 40 2300 630 3 6 WT A E 1 BU BHA 2 2 Mill Tooth Bit 12.25 2166 3911 1745 21.9 0.942 79.7 22 50 3800 728 11 WT A E I BU TD Run 9 5/8" casing 3 3 HTC GTt 8.50 3911 3911 0 OPEN Used Bd 4 4 PDC BIT 8.50 3911 10092 6182 38.9 0.778 159.1 9 46 3800 654 0-1-WT-S-X-I-NO-PP 5 4RRI PDC BIT 8.50 10092 13174 3082 26.3 0.778 117.2 9 80 3850 560 1-1-WT-A-X-I-CT-TD 1A 1 1 PDC BIT 8.50 3950 11298 7348 44.6 0.778 165.0 8/10 81 3800 560 1-2-WT-A-X-I-CT-TD 16 1 1 PDC BIT 8.50 3950 15575 11625 70.7 0.778 165.0 8/12 94 3800 611 1-3-WT-A-X-I-CT-TD HALkiBUATON Sperry Drilling Services Water Base and Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 12 Feb 2008 TD Date: 18 March 2008 Exploration, Nuisqsut Casing Record Date 12-Feb Depth ft - MD 850 Wt 9.60 Vis sec 283 PV 40 YP I1Y100 45 Gels iw~oonz 20/55/0 m~30m s9or~oonoatoaru 3 i25/s5m/53/ze/z7 Cake 3zntls Solids % Water % Sd % CI M L Salt % Wt Lime IWbb pH l Oil DMI ratio Remarks 13-Feb 14-Feb 2068 2472 9.40 9.60 152 174 21 20 40 38 20/65/0 19/60/0 7.0 7 0 82/61/5a39/23/22 78/68/36/28/21/20 3 2 9.6 90.4 4.50 2500 g,g S utl Well 15-Feb 3800 9.60 165 17 37 28170/0 . 7.0 71/54/49/39121/21 2 9.4 9 5 90.6 90 2 2.50 1 25 1700 14 g,5 16-Feb 3911 9.70 88 27 23 13/55/73 7.6 77/sa4a2aias 2 . 9 9 . 90 1 . 1 25 50 1400 g,5 POH for casin 17-Feb 3897 9.70 55 19 7 1/2/0 5.0 45/261a11/y1 1 . 9 9 . 90 1 . 025 125 8.5 18-Feb 3897 9.70 55 19 7 1/2/0 5.0 45/zaisnt/vi 1 . 9 9 . 90 1 0 25 0 1250 9'0 Cement casin 19-Feb 3911 9.70 55 19 7 1/2/2 5.0 a5/2aisnt/vr 1 . 9 9 . 90 1 . 25 0 125 9.0 20-Feb 3911 10.10 190 39 18 11/22/24 2.0 sa57/azrzviino 1 . 5 6 . 30 . 0 9.0 21-Feb 6000 10.00 118 46 23 16.5/28/28 2.0 115/89153/37/14/13 1 . 7 0 30 5 61k 24.1 12 Chan a to Oil Mud 22-Feb 7590 10.00 90 35 23 13/22/22 2.0 93/5a44/31/12117 1 . 9 7 . 3/ 63k 24.4 1.7 60.0 66/34 23-Feb 8844 10.00 114 31 21 14/20/0 2.0 83/52/39127/12/11 1 . 9 5 33 1 10 60k 23.3 1.3 57.0 65/35 24-Feb 9034 10.00 119 27 16 12/20/0 2.0 7aa3/3vz3/en s 1 . 9 8 31 . 0 50 59k 23.1 1.0 67.0 67/33 Drillin 25-Feb 26-Feb 27-Feb 28-Feb 29-Feb 01-Mar 02-Mar 10091 10091 10091 10603 11871 12790 13173 10.00 10.00 10.50 10.35 10.50 10.60 10.60 86 91 76 80 130 147 123 27 27 20 27 54 56 56 16 16 17 18 19 26 23 12/18/0 1311910 6/16/20 314!9 11/23/31 19/34/42 11/24/33 2.0 2.0 2.0 2.0 2.0 2.0 2.0 . ~aa3/32avaa 71/44/32/221a8 s7i37/zarns/a 7vas/2e/rn3re iz7n3/53/3zn/s 138/82181/42/11/10 i35ns/sv33 1 1 1 1 1 1 1 . 10.0 10.0 10.0 10.0 10.0 10.0 10 0 31 31 31 32 32 32 32 . 0.50 0.50 0.35 56k 52k 53k 50k 50k 4370 48k 24.5 23.2 23.5 21.8 22.5 20.8 23.8 1.0 1.6 1.6 1.0 1.0 1.0 0.5 61 0 61.0 60.0 62.0 60.0 60.0 69/31 69/31 68/32 70/30 70/30 71/29 TDri 11irin for 5n i Tri in out BOP test RIH wdh 5 DPH Drillin Ahead Drillin ahead Drillin Pum in Swab 03-Mar 13173 10.70 124 56 23 11/23/33 2.0 i36/ss/sv33nae 1 . 10 0 32 50k 24.2 0.7 58.0 70/30 Drilled TD POOH 04-Mar 13173 10.70 124 56 23 11/24/33 2.0 ~3sns/sv33naa 1 . 10 0 32 50k 24.1 0.7 58.0 70/30 POOH UD BHA 05-Mar 13173 10.70 130 60 22 11/25/37 2.0 138/82/63/36/11/10 1 . 10 0 31 50k 24.2 0.7 58.0 70/30 1 in well O6-Mar 13173 10.70 156 61 21 11/25/38 2.0 13a82163/35/it/10 1 . 10 0 31 50k 25.3 0.7 60.0 72/28 10 in well 07-Mar 08-Mar 13173 13173 10.70 10.80 180 155 62 53 20 27 10/25/35 10/23/30 2.0 2.0 iaa/av5e/3srs/7 133/Ba5131/9/8 1 1 . 10.0 10 0 31 30 50k 50k 25.4 25.6 0.5 0.5 60.0 60.0 72/28 72.28 10 in well 10 in well2nd rt 09-Mar t0-Mar 11-Mar 13173 13173 13173 10.70 10.70 10.70 146 147 149 57 58 58 22 21 21 11/22/30 11/22/31 11/22/31 2.0 2.0 2.0 ~3sna5a3vs/e i37ns/53/3vs/e r37nas3/3vras 1 1 1 . 10.0 10.0 10 0 31 26 26 47k 47.5k 48k 22.1 22.2 22.4 0.5 0.7 0.7 0.0 60.0 70/30 70/30 MDT b wnll 2 MDTIo in 12-Mar 13174 10.70 120 76 26 15/37/39 1.0 nanov7s/a5nvi 1 . 10 0 26 46k 21.7 0.7 60.0 70/30 POOH 13-Mar 13174 10.80 120 66 34 14/34/35 1.0 issnoonv44nin 1 . 13 1 26 48k 23.1 0.6 59.5 70/30 Lo in well 14-Mar 15-Mar 13174 13174 10.80 10.90 120 120 66 64 34 32 15/36/36 16/35/36 7.0 1.0 isanoona/asnvr isassm/aviino 1 1 . 13.2 14 5 25 24 5 48k 475k 23.1 22.9 0.5 0.4 60.0 0 71/29 L in well l rt i6-Mar 17-Mar 18-Mar 13174 13174 13174 10.90 10.70 10.10 120 120 120 67 58 50 26 16 20 18/35/36 13/24/25 11/23/24 1.0 1.0 1.0 isas3/sa/4aiv~o 132174/53/29/8/8 iza-ia5a2sn/s 1 1 1 . 13.2 13.7 13.0 . 23.35 24 25 47k 47k 47k 47k 23.1 23.5 23.5 22.7 0.4 0.6 0.7 0.7 61 .0 60.7 62.0 71/29 72/28 71/29 Clean hole RlH S tted SI and cut TD th s section of hole New Well Tofkat 1A New folder. Tofkat to ~~r ~~ Sperry Drilling. Services Company: Brooks Range Petroleum Area North Slope, Alaska Well Tofkat 1 A Spud Date 19 March 2008 Oil Base Mud Report Rig Nabors 27 Mud Co MI TD Date: 26 March 2008 Exploration, Nuisgsut D ate Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/100ft` Filt m/30m sool3oonoonoo/s/ ak 2nd Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil O/W ratio Remarks 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 3897 3898 4543 5970 7460 9157 11279 11279 9.90 10.00 9.90 10.10 10.00 9.90 10.00 10.00 113 123 120 119 89 86 85 90 49 49 60 49 51 32 31 33 23 22 27 23 27 17 22 19 11/22/25 10/19/25 17/38/0 13/26/0 13/25/0 11/25/0 15/28/34 15/27/32 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 121/72/51/27/7/6 12on1/so/zsn/s 147/87/62/38/11!8/ 121/72/52/33/11/10 129/78/58/37/11!11 81/49/37/25/9/8 84/53/37/24/10/9 85/52/36/24/10/9 1 1 1 1 1 1 1 1 13.0 13.0 13.0 14.5 13.8 12.5 12.5 12.5 25 25 26 25 25.75 25.5 24.5 24.5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47k 47k 41k 46k 45k 43k 47k 48k 22.7 22.7 19.8 22.0 21.5 20.9 23.1 23.5 0.9 0.9 0.7 0.7 0.8 0.5 0.9 0.9 190 190 280 310 415 355 370 380 62.0 62.0 59.5 60.0 60.5 62.0 63.0 63.0 71/29 71/29 70/30 70/30 70/30 70/30 70!30 3 Tested BOP Ta cement failed on to in cement. Ta cement RIH with BHA Drillin ahead 20 stand tri drillin ahead Drillin ahead T.D well POOH BOP T.D well Slip and Cut Sperry Grilling Services Company: Brooks Range Petroleum Area North Slope, Alaska Well Tofkat 1 B Spud Date 27 March 2008 Oil Base Mud Report Rig Nabors 27 Mud Co MI TD Date: April 6th 2008 Exploration, Nuisgsut. D e D at epth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels Ib/100ft` Filt m/30m sool3oolzool~ools/ ak 2nd Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil O/W ratio Remarks 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 01-A r 02-A r 03-A r 04-A r 05-A r 06-A r 07-A r 08-A r 3989 3989 3989 5200 7350 8750 10780 11807 13295 14649 15575 15575 15575 10.00 10.00 10.00 10.00 10.00 10.00 10.10 9.80 9.90 9.90 10.00 10.00 10.00 90 90 90 137 125 120 127 120 110 110 110 126 119 32 32 32 58 46 47 52 39 49 45 44 49 49 19 19 19 30 26 25 26 26 27 24 20 27 27 15/27/32 15/26/31 14/24/31 24/32/40 18/32/40 20/34/41 18/37/45 20/31/37 20/33/40 17/32/40 17/35/42 17/32/40 17/32/40 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 83/51/36/22/10/8 70/54/48/41/30/29 145/87/80/39/11/10 146/88/65/42/18/18 118/72/55/38/13/14 119!72/54/36/12/13/ 130/78/58/38/12/11/ 104/85/58/37/18/15 125/76/63/42/16/15 114/69/53/36/13112 108/64/46/30!13/11 125/77/54/38!14/13 125/76/54/36/14/13 2 2 1 1 1 1 1 1 1 1 1 1 1 12.5 12.5 12.5 11.6 11.6 10.6 12.0 10.7 10.4 10.5 10.4 10.0 10.4 24.5 24.5 24.5 24 25 26 26 26 26 26 26 26 26 0:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49k 49k 49k 42k 39k 43k 43k 40k 40k 40k 41k 40k 41 k 23.8 23.8 23.8 14.8 19.6 20.6 20.6 19.4 20.0 19.4 19.8 19.4 19.8 0.9 0.8 0.8 0.9 1.3 1.8 2.1 1.7 1.8 1.8 1.8 1.8 1.8 80 80 80 80 80 80 80 80 80 00 80 80 80 63.0 63.0 63.0 62.0 62.0 62.0 62.0 62.0 62.0 62:0 62.0 62.0 62.0 72/28 0 70/30 62/38 71/29 70/30 70/30 70/30 70/30 70/30 70/30 70/30 70/30 Ser Ri ,POOH, Cement'ob RIH, TAG Drill a head. Short tri ,Drillin Short trip ,Drillin Sweep ,Drillin Drillin Ahead ,swee Drillin Ahead swee Drillin Ahead Drillin Ahead T.D. WELL. Ri up for Side wall cores Side wall cores, TD . Sperry Nell Name: Tofkat 1 Depth (MD) 5800 to 6500 ft Location: NORTH SLOPE, ALASKA (TVD) 3989 to 4342 ft DRILLING SERVICES Operator: BROOKS RANGE PETROLEUM Show Report No 1 Show Report Report Prepared By Steve Jenkins/ Ed Jones Date/Time: 21-Feb-08 Report Delivered To: DOUG HASTINGS r Interpretation: Topset 3 Claysone: lite brown-gray,soft firm, slightly calcareous. Siltstone: It- med brown ,soft firm, blocky, angular, slightly calcareous. Sand: Fine med, Angular, light gray, sub- rounded, pyritic. ,. .-~ . 1 % Hydrocarbon Ratios Depth 5850 ft Gas x Units 974 Mud Chlorides (1000's) 63 k C1 C1 C1 C1 --------------------------9 -------------- ------------------------------------------ - - Flowline Back round Show C2 C3 C4 C5 PPm Ppm PPm - - -- Hydrocarbon Ratios C1 41295 - 41295 = 41295 C1/C2 = 15.8 1000.C C2 2615 - 2614 = 2614 C1/C3 = 30.7 C3 1489 - 1489 = 1345 C1/C4 = 199.5 C4 207 - 207 = 207 C1/C5 = #DIV/0! NPH C5 0 - 0 = 0 Production 100.0 % -___ ~ Depth _-_5950 ft Gas x Units --- 1091 Mud Chlorides (1000's) 63k Gas ----- -------------- ------ Flowline Background Show ____ ____ ------------------------ ppm ppm ppm Hydrocarbon Ratios 10.0 C1 60383 - = 60383 C1/C2 = 12.4 C2 4888 - = 4888 C1/C3 = 19.3 C3 3128 - = 3128 C1/C4 = 132.1 Oil C4 457 - 0 = 457 C1/C5 = #DIV/0! C5 0 - 0 = 0 NPf Prnrii irfinn ~-------°--- J u~io Depth 6250 ft Gas x Units 760 Mud Chlorides (1000's) 63k -___ ___ ____ --- ------------------- ------------------------------ ---- Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 42939 - = 42939 C1/C2 = 11.8 C2 3642 - = 3642 C1/C3 = 17.4 C3 2469 - = 2469 C7/C4 = 126.3 C4 340 - 0 = 340 C1/C5 = #DIV/0! C5 0 - 0 = 0 4 Depth 6500 ft Gas Flowline Backgro ppm ppm Water Non-Producible Hydroca x Units 875 Mud Chlorides (1000's) ind Show ppm Hydrocarbon Ratios _= 24745 C1/C2 = 9.4 _= 2645 C1/C3 = 12.1 _= 2052 C1lC4 = 75.2 0 = 329 C1lC5 = #DIV/0! 0 = 0 C1 24745 - C2 2645 - C3 2052 - C4 329 - C5 0 - Oil nWater I-INon-Producible __ .-- ~~- ~ - - - --- Hydrocarbon Ratios C1 C1 C1 C1 C2 C3 C4 C5 1000.0 NPH 100.0 Gas 10.0 = Oil NPH s 1.0 -- -~ =~ -- Sperry Well Name: Tofkat 1 Depth (MD) 8650 to 8850 ft Location: NORTH SLOPE, ALASKA (ND) 5425 to 5525 ft DRILLING SERVICE S Operator: BROOKS RANGE PETROLEUM Show Report No. 2 Show Report Report Prepared By Steve Jenkins/ Ed Jones Datelfime: 23-Feb-OS :.. ... :..!rq, ~:;ny:~. .; ,:~ :~}. ..ytl. Report Delivered To: DOUG HASTINGS : .~l. ~py n.. :M ! .n !e:!e b .::: .. ! M:l!i!4 »t4:!I :r. ' r4: ' ~ ...r Interpretation: . . . ....... .. :.i .. .. .. .. . .: .. .. : :.:FS!. .. G.. Claysone: Light Brown Gray, Firm, blocky, slitly calcareous, Sandstone: Off white, cream, very fine g rain, sub- anglar, mod- cei Siltstone: Coarse crystalline, light gray, very coarse g rained, calcite, sub- rounded, poorly sorted, soft, poorly cemented, blocky no apparent bedding. :n....~ 1 .:.a :. ~:.:: ~:ns: :.n .::.: :. ~... !!'::!.r a Depth 8650 ft Gas x Units 75 Mud Chlorides (1000's) 6 --------------------- Flowline -- ---9 --------------------- Back round Show ------------------------------ ppm ppm ppm Hydrocarbon Ratios C1 7324 - = 7324 C1/C2 = 33.3 C2 220 - = 220 C1/C3 = 120.1 C3 61 - = 61 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 __ -------------- ---- Production __ ------------------------ ------------------------------ Analysis x Gas Oil Water Non-Producible Hydrocarbons 2 Depth 8750 ft Gas x Units 74 Mud Chlorides (1000's) 64k --------------------- ---g ----------- Flowline Back round ------------------------------------------ Show ppm ppm ppm Hydrocarbon Ratios C1 7641 - = 7641 C1/C2 = 32.7 C2 234 - = 234 C1/C3 = 186.4 C3 41 - = 41 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 rroaucuon Analysis x Gas Oil Water Non-Producible Hydroca 3 Depth 8850 ft Gas Units 80 Mud Chlorides (1000's) __--- ___ --- ---9 -------------- -----------------------------= Flowline Back round Show ppm ppm ppm Hydrocarbon Ratios C1 5667 - = 5667 C1/C2 = 28.6 C2 198 - = 198 C1/C3 = 83.3 C3 68 - = 68 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 ------------ Production ---------- ---------------------------- ------------------------ Analysis x Gas Oil Water Non-Producible Hydrocai 4 Depth ft Gas x Units Mud Chlorides (1000's) -------------------------------------------------------------------------= Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 - = 0 C1lC2 = #DIV/0! C2 - = 0 C1/C3 = #DIV/0! C3 - = 0 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! C5 0 - 0 = 0 Gas I-IOiI C1 C1 C1 C1 C2 C3 C4 C5 1000.0 NPH 100.0 ~ --~:.- Gas 10.0 Oil NPH 1.0 Hydrocarbon Ratios 64k C1 C1 C1 C2 C3 C4 1000.0 NPH 00.0 Gas 10.0 Oil NPH 1.0 C1 C5 ., f t ~.~ - t'~ via i -t.. •... Ft -ti. t3:. ~~! ~ DRILLING SERVICES Show Report Well Name: Tofkat 1 Location: NORTH SLOPE, ALASKA Operator: BROOKS RANGE PETROLEUM Report Prepared By Steve Jenkins/ Ed Jones Report Delivered To: DOUG HASTINGS ~ • Depth (MD) 12750 to 12900 ft (TVD) 7487 to 7565 ft Show Report No. 3 Date/Time: March the 3rd . ,. Interpretation: Limstone:Buff, Cream, Dolomitic, Moderately hard, Sucrosic, blocky, Glauconite Siltstone: Coarse crystalline, Grey, very coar: grained, sub-rounded, poorly sorted, moderately hard, Blocky, no apparent bedding, Sand: Fine Crystalline, light gray to gray, to fine grain, dolomite, si angular, moderately hard, with glauconite, pyritic, Porosity good. Fluorescence: Moderate, dull yellow with weal oil stain. 1 °i° Depth 12795 ft Gas x Units 30 Mud Chlorides (1000's) 52k ----------------------- ---9 -------------- ------------------------------------------ Flowline Back round Show PPm PPm PPm Hydrocarbon Ratios Hydrocarbon Ratios C1 C1 C1 C1 - - - - C2 C3 C4 C5 ~, 1000 0 - . ' C1 698 - = 698 C1/C2 = 10.0 :~ C2 70 - = 70 C1/C3 = 13 2 = . j C3 53 - = 53 C1/C4 = #DIV/0! C4 - 0 = 0 C1/C5 = #DIV/0! NFH C5 0 - 0 = 0 Production 100.0 __ ~--- - - - --- Anal sis x Gas Oil Water Non-Producible H drocarbons y y 2 th 12850 ft De Gas x Units 45 Mud Chlorides (1000's) ;; ` p ------------------- ---- ---9 -- Flowline Back rou ------------ ----------------------------------- nd Show ------ - Gas .. PPm PPm PPm Hydrocarbon Ratios 10.0 _ _ -- - - - - - --- - - - - ------ -- -- C1 678 - = 678 C1/C2 = 8.9 C2 76 - = 76 C1/C3 = 10.4 C3 65 = 65 C1/C4 = #DIV/o! Oil - C4 0 = 0 C1/C5 = #DIV/0! - - C5 0 - ------------------------- 0 = 0 ------------------------------------------------------------- NPH 1 0 Production Analysis x Gas Oil Water Non-Producible Hydrocarbons . 3 °i° Depth 12900 ft Gas x Units 78 Mud Chlorides (1000's) ----------------------- ---9 -------------- ----------------------------------- Flowline Back round Show ------- C - C Hydroca 1 C - 2 C rbon Ratios 1 C1 C - 3 C4 C 1 5 ppm ppm ppm Hydrocarbon Ratios 1000 0 C1 5115 5115 . - = C1/C2 = 11.2 C2 456 - = 456 C1/C3 = 16 4 . C3 391 - = 32 9 C1/C4 = 83.9 NPH C4 61 - 0 = 61 C1/C5 = #DIV/0! _ ! C5 0 - Production 0 = 0 100.0 ------ - ---------- l Analysis x Gas Oil Water Non-Producible Hydrocarbons 4 De th ft Gas Units Mud Chlorides (1000's) Gas p ---------------------------g --- Flowline Back rou ----------- ------------------------------------ nd Show ------ - - - PPm PPm PPm Hydrocarbon Ratios 10.0 - _ _ _ _ --------_ _ _ _ _ _ --------_-- - ----------- - C1 #DIV/ 0 ! - = C1/C2 = 0 Oil C2 - = 0 C1lC3 = #DIV/0! C3 - = 0 C1/C4 = #DIV/0! - C4 0 = 0 C1/C5 = #DIV/0! - C5 0 - _________________________ 0 = 0 ______ ________________________________________ ______ NPH 1 0 Productlon Analysis x Gas Oil Water Non Producible Hydrocarbons ,:a . - Lithologic Summary Brool~s Range Petroleum Corpoation Tofkat 1 3. Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudlogs 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1272- 1911 TVD Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Clav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1911- 2620 TVD Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 61 1 9 M D 2620- 4150 TVD Shale Wall K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 61 1 9- 6288 M D 4150- 4236 TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. 6288- 6401 M D 4236- 4293 TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 6401 - 6447 M D 4293- 4316 TVD Oannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 6447- 9632 M D 4316- 5921 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks TVD-ft) ft/hr Units 9632- 10496 MD 5921- 6352 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. 1 0496-1 0722 M D 6352- 6465 TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertley sorted, porosity, Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 10722-10988 MD 6465- 6600 TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dul white. Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 2 Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 1 0988-1 1 1 90 MD 6600- 6700 TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 11190-11350 MD 6700-6781 TVD Top of Turbidites Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 11350-11688 MD 6781- 6955 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. Lithologic Summary Brooks Range Petroleum Totkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 1 1 688-1 1 767 M D 6955-6995 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, giauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white Traceof oii stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 1 1 767-1 1 932 M D 6995- 7027 TVD K-1 FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of giauconite. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding.Fluorescence: none,. Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence,Dull white, Cut weak. 1 1 932-11 950 M D 7027-7089 TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of giauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. 4 Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) Whr Units 11950- 12621 MD 7089- 7740 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 1 2621 - 1 2779 M D 7440- 7523 TVD BKU FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SANDSTONE: Light gray to drark grey, very coarse grained sub- Angular, very poorley sorted, friable, moderately hard, blocky, Shale streaks. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Duil white, Cut weak. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. SHALE: Gray to Dark gray, slightly calcareou, very silty, Fluorescence, trace weak. 1 2779- 1 2790 M D 7523- 7540 TVD AlpineC FORMATION Siltstone: Light Gray, very coarse grained, to corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. SHALE: Gray to Brown, slightly calcareous, slighty dolomitic Slightly argillaceous, moderately hard, sucrosic, glauconite Chert. Lithologic Summary Brooks Range Petroleum Tofkat 1 Depth (ft) ROP Gas Formation Lithology and Remarks TVD-ft) ft/hr Units 1 2790- 1 31 74 M D 7540-7731 TVD J-4 FORMATION Sand: Light gray to gray, fine grained, sub angular, moderately Well sorted, moderately well sorted, moderately hard, angular, Glauconite, pyretic, Porosity: good, Fluorescence: moderate Dull yellow, cut: moderately streaming, dull yellow, weak oil Stain. Limestone: Buff, cream, dolomitic, moderately hard, sucrosic Blocky, glauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, sub-rouned, moderately hard, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, chert, slightly caicareou, very silty, Fluorescence, trace weak. 6 Sperry Drilling Service Brooks Range Petro Tofkat # 1 Tops MD TVD SSTVD Gubik Base 575 522 -489 Permafrost Base 1288 1272 -1239 W Sak Base 2064 1911 -1878 Shall Wall (K-5) 3084 2s2o -2587 Shoe 3857 Surface Casing 3911 3032 -2999 Qannik 2 6119 4150 -4097 Qannik 1 x288 4236 -4183 Qannik Base 6401 4293 -4118 C40 6447 4316 -4274 Top Turbidites 9632 5921 -5sss Top Turbidites 2 10496 6352 -6299 Top Turbidites 2 base 10722 6465 -6412 Top Turbidites 1 1os8s ssoo -6547 Top Turbidites 1 base 11190 s7oo -ssa7 H RZ 11350 6781 -6728 Ka l u b i k 11 s88 6955 -6902 K-1 11767 6995 -6942 Kupark C 11932 7027 -6974 LC V 11950 7089 -7036 BKU 12621 7440 -7387 Alpine C 12799 7523 -7470 a~-4 12790 7540 -7487 TD 13174 7731 -7678 PAD Elev. 19.8 Drill Floor 32.9 K.B. 52.7 Qannik Top Albian Turbidites Kuparuk C Brooks Range Petroleum TOE ~! API-~ 50-103-20567-00 2" T Sperry Drilling Services Brooks Range Petroleum T®~ API-~ 50-103-20567-00 2" MU 1. Sperry Drilling Services Brooks Range Petroleum T® T 1 e4P1-~50-103-20567-00 5" ~ ~; .~~ ~~ Sperry Drilling Services Lithologic Summary Brooks Range Petroleum Corpoation Tofkat lA 3. Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudlocls 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1272- 1911 TVD Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Ciav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1911- 2620 TVD Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 61 1 9 M D 2620- 4150 TVD Shale Wail K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, fight grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. IC av: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 5938 MD 4150-TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. MD TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 6232 M D 4350 TVD Oannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 6232- 8903 M D 4350 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. 1 Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ftj ROP Gas Formation Lithology and Remarks TVD-ft) ft/hr Units 8903 M D 5865 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatiely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. MD TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertley sorted, porosity, Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. MD TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dul white. Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. 2 Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units MD TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 10450MD 6757TVD Top of Turbidites Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming San Light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 10844-11121 MD 6967- 7097 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 1 0844- M D 6967 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkiy white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 11121 MD 7097 TVD K-1 FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chert, trace of glauconite. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding.Fluorescence: none, Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence,Dull white, Cut weak. MD TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. 4 Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 11121-11297 MD 7097 7169 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. Sperry Drilling Service Brooks Range Petro Tofkat # 1 A Tops Prognosis Drilled Drill Flooi 32.9 SSTVD MD MD TVD SSTVD K.B. 32.9 Permafrost base W Sak Shale Wall (K-5) Shoe I 3857 Surface Casing 3911 3032 -2999 Topset 3 -4118 5938 4154 -4121 C40 -4380 6744 6232 4350 -4317 Top Turbidites -5900 9972 8903 5865 -5865 H RZ -6765 11,457 10450 6757 -6757 Kalubik -6940 11,783 1.0844 6967 -6967 LCU -7020 12,120 11121 7097 -7097 TD -7650 13,206 11297 7169 -7169 Qannik top Albian Fo TD Date Sidetrack TD ITVD 19-Mar 20-Mar 21-Mar 4742' 3417 22-Mar 6067' 4233 23-Mar 7715' 5189 Brooks Range Petroleum T®1= A I~iPl-50-103-20567-01 2" ~ ~ . ~I Sperry Drilling Services Brooks Range Petroleum T® '~ A API-50-103-20567-01 2" MU®L.C~ Sperry Drilling Services Brooks Range Petroleum ®F A API-50-103-20567-01 5" r.:~ Sperry Drilling Services Lithologic Summary Brooks Range Petroleum Corpoation Totkat 1B 3. Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks f TVD-ft 1 ft/hr Units Reference Information Below to 2" MD &TVD Mudlocfs 3857 Shoe 3911 MD Surface Caseing 3032 TV D 3911- 6119 MD 2620- 4155 TVD Shale Waii K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, light grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Siow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement 6119- 8594 MD 4155 TVD Qannik 2 FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. MD TVD Oannik 1 FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, 0 Lithologic Summary Brooks Range Petroleum Tofkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 8945 MD 4337 TVD Qannik Base FORMATION NANUSHUK Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. 8945-12320 MD 4337-5765 TVD C-40 Albian Foresets Top FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows 12320-14640 MD 5765-6781 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Ouartz, sub rounded, light grey, trace glauconite, no shows. Lithologic Summary Brooks Range Petroleum Tofkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 14640-15098 MD 6781- 6973 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone in part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. 15098-15374 MD 6973-7061 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow strewing with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, Duil white, Cut weak. 15374-15388 MD 7061-7080 TVD Kuparuk C FORMATION Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE:Gray to Dark gray, slightly calcareous, trace sandy, very silty, Fluorescence, Dull white, cut weak. 2 Lithotogic Summary Brooks Range Petroleum Totkat 1B Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 15388-15575 MD 7080- 7146 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of whit®, cut is moderately streaming with dul white Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. TD WELL. 15775MD 71 99 TV D Sperry Drilling Service Brooks Range Petro Tofkat # 1 B Tops Tofkat 1 B ~ Pad ele 20 Prognosis Drilled Drill Flc 33 SSTV D M D M D TV D SSTV D K.B. 53 Date M D TV D Permafrost base W Sak Shale Wall. (K-5) Sidetrack 1 B Shoe ~ 3857 Surface Casing 3911 3032 -2999 Topset 3 -4092 8626 8594 4155 -4102 Nanushuk 31-Mar 5503 3450 C40 -4263 9038 8945 4337 -4284 top Albian Foresets 01-Apr 7697 3909 Top Turbidites -5835 12586 12320 5765 -5765 02-Apr 9211 4407 HRZ -6785 14,730 14640 6781 -6781 03-Apr 10789 5130 Kalubik -6980 15,170 15098 6973 -6973 04-Apr 12,158 5680 Kup C 15374 7061 -7061 05-Apr 14,066 LCU -7015 15,250 15388 7080 -7080 06-Apr 15,575 7199 TD -7200 15575 7146 -7146 Brooks Range Petroleum TOF 1B API-50-103-20567-02 ~'~ nnu~.~ Sperry Drilling Services Brooks Range Petroleum TOF T '~ ~ API-50-103-20567-02 2" 7'V® Ml1 Lt~ Sperry Drilling Services Brooks Range Petroleum '!•®F °T 1 API- 50-103-20567-02 5" MU Sperry Drilling Services Brooks Range Petroleum 'rOFKAT' '~ , , 1 ~ API-~50-103-20567-00 API®50-103-20567-01 API-50-103-20567-02 CD D T~ EOWR EMF and PDT' LOGS Sperry Drilling Services Customer: Brooks Ran e Petroleum R rt N 1 IH~o-If'~tlBt.d€~T~3V g epo o.: Well: Tofkat 1 Date: 13/02/2008 Sperry Or711ing S®rvices Area: North Slope Depth 1015 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1015 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 80 ft/hr 118 ft/hr ( 429 ftlhr C~3 870 ) Gas* 0 unit: 2.5 unit; ( 33 units C°3 1004 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 2 spm Flow rate 415 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 1090 psi . Mud Wt In 9.60 ppg Visc # 283 secs API filt ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 40 cP YP 45 Ibs/100ft2 Gels 20 \ 55 \ 0 MBT pH 9.0 Sd Bit No.: 1 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 Wt On Bit: 14-Jan RPM: 40 Hrs. On Bit: 8.6 Total Revs on Bit: 1 k Footage for Bit Run 1015 Short Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % CLAY 20 % GRAVEL Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 712 to 730 10 tr 1009 0 0 0 0 910 to 1005 33 10 3315 0 0 0 0 to to to 24 hr Rec< S ud well. Drill to 1015ft `' Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 2 t-fAILiL9 ~~~, Well: g Tofkat 1 p . Date: 14/02/2008 Siparry Grilling Sarvic®s Area: North Slope Depth 2166 udlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1151 Rig Activity: wiper trip Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 119 ft/hr ( 416 ft/hr C~ 1789 Gas* 67 unit: 47 unit; ( 225 units ~ 1873 ( Sample Quality Good xQ Fair Poor ) ) ) Pump and Flow Data Pumps 1+2 spm Flow rate 630 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 2300 psi Mud Wt In 9.40 ppg Visc 152 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.60 ppg PV 21 cP YP 40 Ibs/100ft2 Gels 20 \ 65 \ 0 MBT pH 8.8 Sd 4.5 Bit No.: 1 Type: Milltooth Bit Size: Wt Ort Bit: • 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 22.9 Total Revs on Bit: Footage for Bit Run 2166 Short Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 100 % CLAY Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 1513 to 1676 127 32 1795 to 1820 185 79 1867 to 1888 225 80 1955 to 1976 209 47 to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 6287 0 0 0 0 no data 4676 0 0 0 0 8982 23 0 0 0 24 hr Rec< Drill 1015ft to 2166ft, wi er tri Logging Engineer: Steven Jenkins /Ian Johnstone "' 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re rt N 3 ~ ~~t ,~„ Well: g Tofkat 1 po o.: Date: 15/02/2008 Sp®rry Grilling S®rvicBS Area• North Slope Depth 2733 udlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 567 Rig Activity:. Drilling Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 40 ft/hr 10.2 ft/hr ( 187 ft/hr C~ 2643 Gas' 140 unit: 70 unit; ( 181 units ~ 2644 ( Sample Quality Good Q Fair Poor ) ) ) Pump and Flow Data Pumps 1+2 spm Flow rate 710 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres 2960 psi Mud Wt In 9.60 ppg Visc 174 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.60 ppg PV 20 cP YP 38 Ibs/100ft2 Gels 19 \ 60 \ 0 MBT pH 8.5 Sd 2.5 Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 10.2 Total Revs on Bit: Footage for Bit Run 567 Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 299 Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 50 % CLAY 40 % CLYST 10 % SLTST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 2350 to 2360 93 55 2434 to 2453 103 75 2534 to 2549 153 70 2596 to 2675 181 72 to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 6047 28 0 0 0 6418 32 0 0 0 8363 29 0 0 0 12833 27 0 0 0 24 hr Rec< Drill to 2166ft, POH for bit chan e. RIH bit#2. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 4 ~A~fL I~RT Well: g Tofkat 1 p . Date: 16/02/2008 Sp®rry Drilling ser..ices Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1178 Rig Activity: wiper trip Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 128 ft/hr ( 336 ft/hr ~ 3127 Gas* na unit; 125 unit; ( 325 units @ 2933 ( Sample Quality Good x^ Fair Poor ) ) ) Pump and Flow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3780 psi Mud Wt In 9.60 ppg Visc 165 secs API filt 7.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 17 cP YP 37 Ibs/100ft2 Gels 28 \ 70 \ 0 MBT pH 9.5 Sd 1.25 Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 21.9 Total Revs on Bit: Footage for Bit Run 1745 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: _ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL Connection Gas and Mud Cut 2936 ft 325 units 9.6 ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background 2930 to 2935 325 204 3272 to 3290 206 165 to 3691 to 3705 285 45 3791 to 3800 188 60 GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 18898 324 52 0 0 26268 0 0 0 0 12386 63 13 0 0 14000 64 7 0 0 24 hr Rec~ Drill to 3910ft. Circ hole clean. Wi er tri Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e P tr l R rt N E-1A.iLIL~3t.~~3'T~~1 g e o eum epo o.: 5 Well: Tofkat 1 Date: 17/02/2008 Sp®rry Grilling Services Area: North Slope Depth 3911 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Run Casing Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C°3 ) Gas* na unit: unit: ( units ~ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3780 psi Mud Wt In 9.70 ppg Visc s8 secs API filt 7.6 ml HTHP 0.0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 27 cP YP 23 Ibs/100ft2 Gels 13 \ 55 \ 73 MBT ### pH 8.5 Sd 1.25 Bit No.: 2 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 21.9 Total Revs on Bit: Footage for Bit Run 1745 Trip Depth: 3911 ft Trip Gas: 1272 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Wi er tri . Circ hole clean. POH. Run casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Bro k R P t l R N iH°4i1'ILII~It~3~Tt'~IitV o s ange ro e eum eport o.: 6 Well: Tofkat 1 Date: 18/02/2008 Sperry Drilling services Area: North Slope Depth 3911 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Caseing Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr @ ) Gas* na unit: unit: ( units ® ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x x x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY d0 °~ GRAVEL °~ ~ -_ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Run /cement casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Bro k R P l t t-1AILL11E3t~IIFt'I't3~1 o s ange ro e eum Report No.: 7 Well: Tofkat 1 Date: 19/02/2008 ~p®rry Grilling 8®rvicss Area: North Slope Depth 3911 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: BOP Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C~ ) Gas* na unit; unit: ( units C~ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: psi , Mud Wt In 9.70 ppg Visc 55 secs API Tilt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 '"' Bit No.: Type: Bit Size: Jets: x x x TFA: Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 °~ CLAY 40 °o GRAVEL °~ °o ~~, _ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< cement casin . N/U BOP. Test BOP : Logging Engineer: Steven Jenkins /Ian Johnstone *' 10000 units = 100% Gas In Air Customer: Brooks R P t l R HILLa ~~ "1<' ange e ro eum eport No.: 8 Well: Tofkat 1 Date: 20/02/2008 Sperry Drilling sar..i~®s Area: North Slope Depth 3911 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Circulate Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr fUhr ( ft/hr ~ ) Gas* na unit: unit: ( units C~ ) ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps 120 spm Flow rate 526 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 92o psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.7 ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibs/100ft2 Gels 1 \ 2 \ 2 MBT pH 9.0 Sd 0.25 Bit No.: 3 Type: HTC GT1 Bit Size: 8 1/2 Jets: x x x TFA: OPEN Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 °~ CLAY d0 °~ GRAVEL °, °~ _~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units Pp9 ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< Test BOP. RIH. M/U i e, RIH and drill cement, float and shoe to 3911ft. Dis lace to OBM Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air - Customer: Brooks Ran e Petroleum Re ort No : 9 !-II~-ILILIBtl.~ll~'~'t~1\II g p . Well: Tofkat 1 Date: 21 /02/2008 Sperry Grilling Services Area: North Slope Depth 4480 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 569 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 320 ftlhr 213 ft/hr ( 373 ft/hr C°3 4079 ) Gas* 113 unit: 68 unit: ( 139 units C~ 4323 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 112 spm Flow rate 470 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3760 psi '" Mud Wt In 10.10 ppg Visc 190 secs API filt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 39 cP YP 18 Ibs/100ft2 Gels 11 \ 22 \ 24 MBT pH Sd 0.25 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 72 Hrs. On Bit: 2.7 Total Revs on Bit: Footage for Bit Run 569 Trip Depth: 3911 ft Trip Gas: 22 Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology~ 100 °< CLYST °_ °~ % °~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 4096 to 4130 111 50 8598 0 0 0 0 4315 to 4348 139 74 9717 0 0 0 0 to to to 24 hr Rec~ POH bit3. RIH bit4. Drill 39121ft to 3931ft. Leak off test. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No : 10 ~~ _ '~~°'~~'""~~~~"-~¢~ ~- ~ Well: Tofkat 1 . Date: 22/02/2008 SFaer.-y drilling sa~..~~BS Area: North Slope Depth 6716 - _ Mudlogger's Morning Report lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 2236 Rig Activity: drilling Report For: Jack Keener Daily Cost $3,075 y :~ °~' >~ `. Current 24 hr Avg 24 hr Max R.O.P. 225 ft/hr 219 ft/hr ( 670 ft/hr @ 5184 Gas" 329 unit: 315 unit: ( 1001 units @ 6004 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps 107 spm Flow rate 435 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 4090 psi Mud Wt In 10.00 ppg Visc 118 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 46 cP YP 23 Ibs/100ft2 Gels 17 \ 28 \ 28 MBT pH Sd ?= '~ Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 5.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 12.97 Total Revs on Bit: Footage for Bit Run 2805 ` J' Trip Depth: ft Trip Gas: Short Trip Depth 5855 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 413 Mud Cut: 10.1 ppg Short Trip CI: 31689 ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % CLYST 20 % SLTST '„ '~ '',' Connection Gas and Mud Cut 5956 ft 965 units 10.1 ppg 6053 ft 984 units 10.1 ppg 6147 ft 975 units 10.1 ppg 6244 ft 720 units 10.1 ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg _- `y, ~_ Depth Gas in units Max Background 5294 to 5311 243 211 GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 19118 141 17 0 0 -{ 5573 to 5669 389 262 5901 to 5936 950 417 5975 to 6007 1001 520 6296 to 6343 702 422 29955 624 64610 4281 65701 5083 47539 4016 171 0 0 2605 347 2 3228 488 34 2694 381 3 24 hr Rec< Drill ahead. Wi er tri sat 4906ft, 5855ft. Connection ases seen after wi er tri at 5855ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air : 11 Customer: Brooks Range Petroleum Report No _ '~~~~~'~~' ~ . Well: Tofkat 1 Date: 23/02/2008 'Sperry Drilling Services Area: North Slope Depth 7785 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1069 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,000 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 158 ft/hr ( 306 ft/hr @ 7584 ) Gas'' na unit: 136 unit: ( 327 units @ 6717 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 110 spm Flow rate 454 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 3990 psi Mud Wt In 10.00 ppg Visc 90 secs API Tilt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 35 cP YP 23 Ibs/100ft2 Gels 13 \ 22 \ 22 MBT pH Sd r' Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 19.72 Total Revs on Bit: Footage for Bit Run 3874 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLYST 30 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to `~ 24 hr Rec< Drill ahead. Wi er tri sat 6813ft, 7785ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air : 12 Customer: Brooks Range Petroleum Report No -1~`~-~ ~ ~~"'j~~ . Well: Tofkat 1 Date: 24/02/2008 Sperry drilling S@rvices Area: North Slope Depth 9227 - Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1441 Rig: Nabors 27 Rig Activity: Drilling Ahead Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 `" ~': Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 120 ft/hr ( 306 ft/hr @ 7584 ) Gas* 72 unit: 151 unit: ( 151 units @ 3940 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 105 spm Flow rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres; 4065 psi Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 30 cP YP 22 Ibs/100ft2 Gels 11 \ 18 \ 0 MBT pH Sd % - - " ` Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 30.70 Total Revs on Bit: Footage for Bit Run 5313 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft '' Current Lithology: 40 % CLYST 40 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg n -~-; .... - GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ~, 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. # ~: ;r '~ 1_ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air = Customer: : 13 Brooks Ran e Petroleum Report No _ J"~~i1°~ I ~ , ~- ~ ~ ~ ~ ~~ Well: g . Tofkat 1 Date: 25/02/2008 'Spar-ry drilling Services Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 865 Nabors 27 Rig Activity: POOH AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 s . - . `, Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 72 ft/hr ( 149 ft/hr @ 9858 ) Gas" na unit: 55 unit: ( 76 units @ 9486 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 105 spm Flow rate 430 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 4065 psi <:? Mud Wt In 10.00 ppg Visc 66 secs API Tilt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd - - ', ?- Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST _ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ -: ; ~_ 's~ epth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot ">' 4'' to to to :;' 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. Sto drl , circ btm u ,be in POOH, L/D d . Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~~ : 14 Customer: Brooks Range Petroleum Report No _ ~~~'~, ~ . Well: Tofkat 1 Date: 26/02/2008 8per~y o.-~n:.,g services Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 '`' `r. Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 ) Gas* na unit: na unit: ( 76 units @ 9486 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi ; Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd ~`. Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST `_~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg =' GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to `` 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. finish POOH.. La down MWD. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 15 '~a~? °'~""~~"'~~' Well: Tofkat 1 Date: 27/02/2008 sp®rry drilling Services Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: BOP test Report For: Jack Keener Daily Cost $3,075 `'; '~' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas* na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres; na psi :`~` _ ~, Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd % '' ". ' Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft = Current Lithology: 45 % CLYST 30 % SLTST 25 % SST r Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg _ Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot y -`x 24 hr Rec< Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. Test BOP's v Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air '= Customer: : 16 Brooks Range Petroleum Report No _ `~~~°'~"°~`' ~ Well: Tofkat 1 . Date: 28/02/2008 Sperry Grilling sa.-vGc®s Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 0 Rig Activity: Wash and Ream Report For: Jack Keener Daily Cost $3,075 ~`~ ','~+ ~~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas' na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi ,:~; %E Mud Wt In 10.00 ppg Visc 76 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 20 cP YP 17 Ibs/100ft2 Gels 6 \ 16 \ 20 MBT pH Sd '' :; Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 i Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg j.. _ .. 'u ~~ '. °,~ ~; '`'' ~'~ Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot - ~~~ _ 24 hr Rec~ Drill ahead. Wi er tri sat 6813ft, 7785ft. 8940 ft. TIH to bottom, wash and ream... - ;: ,~~ 'N Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 17 Customer: Brooks Range Petroleum Report No _ _ ~~~ ' ~~~"~ . Well: Tofkat 1 Date: 29/02/2008 Sp®rry drilling servGcBS Area: North Slope Depth 10092 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 798 Rig: Nabors 27 Rig Activity: Wash and Ream Job No.: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 ', ;~ Current 24 hr Avg 24 hr Max R.O.P. 139 ft/hr 80 ft/hr ( 246 ft/hr @ 10668 ) Gas" 129 unit; 245 unit: ( 2400 units @ 10092 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flow rate 534 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 3414 psi `' Mud Wt In 10.35 ppg Visc 80 secs API felt ml HTHP 3.1 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.35 ppg PV 27 cP YP 18 Ibs/100ft2 Gels 3 \ 4 \ 9 MBT pH Sd % > -'` Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 45.30 Total Revs on Bit: Footage for Bit Run 6973 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CLYST 30 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units .ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units. ppg ft units ppg ft units ppg ~ '" GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to c ;: 24 hr Rect Drillin Ahead -> ;` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 18 u~~~~~~L~~ Well: Tofkat 1 Date: 03/01/2008 Sperry drilling sB.-..roes Area: North Slope Depth 12070 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 978 Nabors 27 Rig Activity: Drill Ahead AK-AM-5672885 Report For: Mr Larry Daily Cost $3,075 ~ >!~ = >~ `.'' °. Current 24 hr Avg 24 hr Max R.O.P. 204 ft/hr 45 ft/hr ( 334 ft/hr @ 12000 ) Gas" 25 unit: 45 unit: ( 186 units @ 11938 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flow rate 534 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 3414 psi ` Mud Wt In 10.40 ppg Visc 94 secs API felt ml HTHP 3.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.40 ppg PV 36 cP YP 16 Ibs/100ft2 Gels 5 \ 11 \ 17 MBT pH Sd `x ~~~ Bit tVo.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 62.30 Total Revs on Bit: Footage for Bit Run 7951 5 ' Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 40 % SH 40 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units. ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth Gas in units Max Background 11938 to 11940 186 40 to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C~ Tot 8 1 1 1 to to to v> ~'~ 24 hr Rec< Drillin Ahead,Work on Pum s, Dril Ahead ~~' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 19 Customer: Brooks Range Petroleum Report No _ '~~3~~~°~ ~' "~~'' \~ . Well: Tofkat 1 Date: 02/03/2008 -~ Sp®rr~y Drilling Services Area: North Slope Depth 12795 Lease: Exploration Footage Last 24 hrs: 725 Rig: Nabors 27 Rig Activity: Drill Ahead Job No.: AK-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data -` R.O.P. na ft/hr 30 ft/hr ( 289 ft/hr @ 12115 ) Pumps 74 spm Flow rate 311 gpm ''' Gas" 7 unit: 18 unit: ( 25 units @ 12504 ) Pump Capacity 4.41 gps :; ( ) Pump Liner & Strk 6 x 12 in. Sample Quality x Good ~ Fair Poor Pump Pres: 2131 psi Mud Wt In 10.60 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out 10.60 ppg PV 56 cP YP 26 Ibs/100ft2 Gels 19 \ 34 \ 42 MBT pH Sd `~ _ ~ - ,.. .. - Bit No.: 4 Type: PDC Bit Size: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 '' ~'. Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 84.30 Total Revs on Bit: Footage for Bit Run 8676 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm '` Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % LS Connection Gas and Mud Cut <J ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg `t ft units ppg ft units ppg ft units ppg "f ft units ppg ft units ppg ft units ppg .: ' - ~ .> s` GAS PEAKS ~' Depth Gas in units Chromatograph in ppm '-~ K~ Max Background C1 C2 C3 C4 Tot C5 Tot ~ to _ to •y, tO y!r ~f ~ to t0 j: ,, .. i. a .. 24 hr Rec< ``s Drillin ahead, work on um s, ~; >{ ~: `." Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air '` Customer: : 20 Brooks Range Petroleum Report No __ ~~°'~°~~ ' ~3 ~ Well: . Tofkat 1 Date: 04/03/2008 - ` Sperry drilling sB.-.aces Area: North Slope Depth 13173 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TD-POOH AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 '. _` ~:~=r ~:~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" na unit; 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi ` :: `' Mud Wt In 10.70 ppg Visc 124 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd ~. Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST % % i _" Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg a ' Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot `~ 24 hr Recs Finish POOH, ri u for runnin a-lo s.... { ~S '~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 21 Brooks Ran e Petroleum Report No "~~t'~°' ~°` ~ Well: g Tofkat 1 . Date: 04/03/2008 `' Sp®rry Grilling sar..~~as Area: North Slope Depth 13173 _ Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TD-POOH Job No.: AK-AM-5672885 Report For: Mr Larry ' Mudlogger's Morning Report Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data r `; R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm 1 "' Gas" na unit; 0 unit: ( 0 units @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. f- :' ''.Sample Quality x Good ~ Fair Poor Pump Pres: na psi ~ Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg ``` Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd % ~°~ 5 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ' ` Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 ~. Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft - <. Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ~, "` ft units ppg ft units ppg ft units ppg x° ft units ppg ft units ppg ft units ppg ~` ft units ppg ft units ppg ft units ppg ~; ft units ppg ft units ppg ft units ppg ~~ . - _ ~~ GAS PEAKS '} Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot ,'; to `' ` -~ to ~ k' t0 ;~' li; t0 . ~{ t0 :`~ 24 hr Rec~ 3 Finish POOH, ri u for runnin a-lo s.... ; : ; `~ Logging Engineer: Steven Jenkins / Ed Jones ~` 10000 units = 100% Gas In Air °~ Customer: : 22 Brooks Range Petroleum Report No -:~~1 ~ ~" -` ~ Well: . Tofkat 1 Date: 05/03/2008 °: 'Sperry Grilling Services Area: North Slope Depth 13173 - Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: TD-POOH AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 ~=; '~' `: Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas' na unit: 0 unit; ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi ;' ~_ =~ _ Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd ,; ~ .* `:_~- 'Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST ~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg '` Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm. C1 C2 C3 C4 Tot C5 Tot ~~ 24hr Rec~ Did BOP test, and be in runnin a-lo s on d . , :: ~~4 - y; ` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ` Customer: Brooks Range : 23 Petroleum Report No ~~~~ ~"° `~ ~~ '' ~_3 Well: Tofkat 1 . Date: 06/03/2008 ~: Sp@rry drilling Sar..icas Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry ,.,. Mudlogger's Morning Report Daily Cost $2,375 .l Current 24 hr Avg 24 hr Max Pump and Flow Data e R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm ' :' >~'; Gas" na unit: 0 unit; ( 0 units @ 0 ) Pump Capacity na gps ;~ ( ) Pump Liner & Strk na in. ;'° r~' Sample Quality x Good ~ Fair Poor Pump Pres: na psi . ~~ Mud Wt In 10.70 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg ,.t =t Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd - ~`: Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 '~' Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 . k( . ~.," `rt> ; ~:_ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm `! Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft = Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ry4 ft units ppg ft units ppg ft units ppg = ft units ppg ft units ppg ft units ppg - ft units ppg ft units .ppg ft units ppg ~. ft units ppg ft units ppg ft units ppg _F= ,. , <, ,, K GAS PEAKS ~: Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to 4. to t~ ,J t0 24 hr Rec< ~ a 1, POOH from a to in on drill i e.... -Y ' >x Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 24 Brooks Ran e Petroleum Report No g . ' d•-9~~9mJ.®.~;~ Well: Tofkat 1 Date: 07/03/2008 ~` Sperry drilling services Area: North Sloe Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 ,:~ Rig: Nabors 27 Rig Activity: E-Loggin g Job No.: AK-AM-5672885 Report For: Mr Larry ., ~ Mudlogger's Morning Report Daily Cost $2,375 . .p Current 24 hr Avg 24 hr Max Pump and Flow Data -~~ R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm ,~ Gas" na unit; 0 unit: ( 0 u nits @ 0 ) Pump Capacity na gps 'S ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi ~~~ Mud Wt In 10.70 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd - - % k -t `s Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 . . ., Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 1"~ ,r` Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm ?- Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft `` Current Lithology: 80 % SH 10 % SLTST 10 % SST R . Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS ~. Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ~' 24 hr Rect -' POOH from a to in on drill i e.... ~'' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air f Customer: Brooks Ran e Petroleum Re ort No : 25 ~~`~'~'°~~~~~\~ g p . Well: Tofkat1 Date: 08/03/2008 Sperry Grilling Se.-..~~es Area: North Sloe Depth 13173 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 ~' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* na unit: 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 180 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 62 cP YP 20 Ibs/100ft2 Gels 11 \ 25 \ 35 MBT pH Sd ~~' ~~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST `..< Connection Gas and Mud Cut ft units. ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ;_ GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ;7 - 24 hr Rec~ E-Lo in on drill i e.. '< Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 26 ` _ 1~i~1,~~ ~ ~ _.°°'~" ~~ Well: g Tofkat 1 p . Date: 09/03/2008 "; Sperry drilling 'Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Loggin g Job No.: AK-AM-5672885 Report For: Mr Larry Mudlogger's Morning Report Daily Cost $2,375 ~ ._. ., Current 24 hr Avg 24 hr Max Pump and Flow Data .' =~ R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm +: Gas" na unit: 0 unit: ( 0 units @ 0 ) Pump Capacity na gps :; ; ( ) Pump Liner & Strk na in. _ '~~ Sample Quality x Good ~ Fair Poo r Pump Pres: na psi Mud Wt In 10.80 ppg Visc 155 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 53 cP YP 27 Ibs/100ft2 Gels 10 \ 23 \ 33 MBT pH Sd % ~- ~~~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm :Y T'f >~, , Magnet Recover Lbs to to Feet of Fill on Bottom: ft , ~~' Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg `~ ~ ; x`' ft units ppg ft units ppg ft units ppg ' ' ft units ppg ft units ppg ft units ppg .~ ft units ppg ft units ppg ft units ppg >. ~ GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot } Est' to ;.'t. ~fc to x; to ~Ya .s Y t~ to , 'i' -:4 y ~ 24 hr Rec< `~ E-Lo in on drill i e.. Current) POOH w/core uns.. ~? ~,. ' Y: i~S Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 27 ,~ ~ , _, = '~~~ ~`'" ~'' ~`' ~ -` g p . Well: Tofkat 1 Date: 10/03/2008 Sperry Grilling services Area: North Slope Depth 13173 - udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 ` `" °':~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* na unit: 0 unit; ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi . `-;`; ,;. - ~~ Mud Wt In 10.70 ppg Visc 146 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 57 cP YP 22 Ibs/100ft2 Gels 11 \ 22 \ 30 MBT pH Sd ~' Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg k, `;y '- - GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to - 24 hr Rec< " E-Lo in on drill i e.. " Y `~` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : 28 '~~ ~~° ~ ~~ ~' ` g p . Well: Tofkat 1 Date: 11 /03/2008 = 8p®rry drilling sBr..icas Area: North Sloe De th 13173 p . udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 "` Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas"` na unit; 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner& Strk na in. Pump Pres: na psi "'. ;;. Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd % :. :`? Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft - Current Lithology: 80 % SH 10 % SLTST 10 % SST ' Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ :a ;<F ; GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to - Continued E-Lo in .. f. ~] ^% a:4 _1 C `; Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air C ustomer: B k R P t l _ ~ roo s ange ro e eum Report No.: 29 '~ ~~'~~-~' ~ ~~'~' ° ~ Well: Tofkat 1 Date: 12/03/2008 Sperry drilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps na spm Flow rate na gpm Gas" na unit: 0 unit; ( 0 units @ 0 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ .Fair Poor Pump Pres: na psi Mud Wt In 10.70 ppg Visc 147 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT_pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Trip Depth: ft Trip Gas: : Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Current Lithology: 80 % SH 10 % SLTST Connection Gas and Mud Cut ft units ppg ft ft units ppg ft ft units ppg ft ft . units ppg ft Jets: 6 x 13 x x TFA: 0.778 Total Revs on Bit: Footage for Bit Run 9054 " - ,. _ Mud Cut: ppg Trip CI: ppm _ Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft 10 % SST units ppg ft _ units ppg ft _ units ppg ft _ units ppg ft GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot units ppg units ppg units ppg units ppg to ,x to to ~ to ~~ to ,r - ,._. 24 hr Rec~ Continued E-Lo in on drill i e.... '~y- a Y ` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum R rt N 30 tel: ~ ..7~ ~ ~ ~_ .`~° ~; ~`~ g epo o.: Well: Tofkat 1 Date: 13/03/2008 Sperry Drilling Services Area: North Slope Depth 13173 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 '' -'- Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" 23 unit; 0 unit: ( 209 units @ 3752 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi Mud Wt In 10.70 ppg Visc 270 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg PV 76 cP YP 26 Ibs/100ft2 Gels 15 \ 37 \ 39 MBT pH Sd ;: Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 _ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to .~ ~r) 24 hr Rec~ Stage in the hole for cement rob... `:Y ;t Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~~ Customer: Brooks Ran e Petroleum Re ort No : 31 ~` ~~ mss; ~' ~'~ g p . Well: Tofkat 1 Date: 14/03/2008 :' Sperry i'rilling Servic®s Area: North Slope Depth 13173 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH, Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 `~ "- '' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 2 unit: 0 unit; ( 8414 units @ 10200 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi . Mud Wt In 10.80 ppg Visc 221 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg PV 66 cP YP 34 Ibs/100ft2 Gels 14 \ 34 \ 35 MBT pH Sd .~ '' Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg _ ''~ x GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to : 24 hr Rec~ Sta a in hole, Circulate bottoms u ,max as 8414 units. Pum 2 cmt lu s, circ btm u ,POOH.. ~, !A Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 32 `~~~~~ ~"" ~~ Well: Tofkat 1 Date: 15/03/2008 ~: Sp®rry Drilling s@r..icas Area: North Slope Depth 13173 < Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Rig UP for Cmt AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 ; __ .."` -~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 2 unit: 0 unit: ( 417 units @ 9920 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi ; Mud Wt In 10.80 ppg Visc 275 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.8 ppg Mud Wt Out 0.00 ppg PV 66 cP YP 34 Ibs/100ft2 Gels 15 \ 36 \ 36 MBT pH Sd ~; Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 `~` Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg `' k: { Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Rec~ TIH, to cmt. 9950 ft. circulate hole, Max as 417 units.POOH, R/U BHA w/ cmt stin er & TIH.. z ~~~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 33 Brooks Range Petroleum Report No _ _ _ j~~~ ' ' ' Well: . Tofkat 1 Date: 16/03/2008 Sperry drilling Services Area: North Slope Depth 13173 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Rig UP for Cmt AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 ~~ Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* 45 unit: 0 unit; ( 62 units @ 6540 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57 spm Flow rate 161 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 601 psi '. - 4 . Mud Wt In 10.80 ppg Mud Wt Out 10.90 ppg Visc 265 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg PV 64 cP YP 32 Ibs/100ft2 Gels 16 \ 35 \ 36 MBT pH Sd Bit No.: 4 Type: Wt On Bit: 9.00 RPM: PDC Bit Size: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: Short Trip Depth .Magnet Recover Lbs ft Trip Gas: ft Short Trip Gas: to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft - Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth Gas in units Max Background ~`: to to ~~ to to to ~' 24 hr Rec< Set 3rd cmt plug, POOH to set 4th plug, circ btm GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot set plug. POOH. ~i ,y ~'' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air `` Customer: Brooks Range Petroleum Report No.: 34 ~~' ~ ~"' ~ Well: Tofkat 1 Date: 17/03/2008 `~: sFaa.-.-y drilling sB.-..~~®s Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $2,375 ~~` Current 24 hr Avg 24 hr Max Pump and Flow Data r sr R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 40 spm Flow rate 140 gpm '~-, Gas" 2 unit; 0 unit: ( 20 units @ 5055 ) Pump Capacity 4.01 gps ~~ ( ) Pump Liner & Strk na in. `'°: ;~ Sample Quality x Good ~ Fair Poor Pump Pres: 588 psi Mud Wt In 10.90 ppg Visc 260 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.90 ppg PV 67 cP YP 26 Ibs/100ft2 Gels 18 \ 35 \ 36 MBT pH Sd ~* Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg H` ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg '~` GAS PEAKS h i ~~~ Depth Gas in units n ppm Chromatograp ~'~~ Max Background C1 C2 C3 C4 Tot C5 Tot ' .. to < ,y ti t0 A ``', cy t0 ';jS t~ t. t0 3; '.y 24 hr Rec~ ''-l #' TIH, circ btm u ,cement, ull into cs ,service ri . . ;f (~ ` ~ f ' . a! A$. "t ^{ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 35 Customer: Brooks Range Petroleum Report No ~' ~`'~ ~ `°'~' '~ ~, ` . Well: Tofkat 1 Date: 18/03/2008 Sperry drilling S®.-..ices Area: North Slope Depth 13173 -~ Lease: Exploration Footage Last 24 hrs: 0 t Rig: Nabors 27 Rig Activity: CMT s Job No.: AK-AM-5672885 Report For: Mr Jack .- Mudlogger's Morning Report Daily Cost $2,375 ,_ ., ~. V Current 24 hr Avg 24 hr Max Pump and Flow Data ,-~ ;~ ;~ R.O.P. na ft/hr 0 ftlhr ( 0 ft/hr @ 0 ) Pumps 49 spm Flow rate 204 gpm ; >~~ Gas'` na unit; 0 unit; ( 25 units @ 6120 ) Pump Capacity 4.01 gps --~? ~~ ( ) Pump Liner & Strk na in. 'j Sample Quality x Good ~ Fair Poor Pump Pres: 488 psi , , Mud Wt In 10.80 ppg Visc 200 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out 10.80 ppg PV 58 cP YP 16 Ibs/100ft2 Gels 13 \ 24 \ 25 MBT pH Sd % ~_ ` `,' t: ~ yp FA: 0.778 Bit No.: 4 T e: PDC Bit Size. 8 1/2 Jets: 6 x 13 x x T = ,, Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 .. ~; Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm c' Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm '= s ~J Magnet Recover LbS to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST .. ~ - _ . ~ _: Connection Gas and Mud Cut ~;<; ft units ppg ft units ppg ft units ppg _ ft units ppg ft units ppg ft units ppg ~., ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg . .. . .._. ~.::. >~ ~, ., . ~ ., -- -> . , GAS PEAKS '~' Depth Gas in units Chromatograph in ppm - Max Background C1 C2 C3 C4 Tot C5 Tot `w to to '' to to to 24 hr Rec< Service ri , sli & cut drill line, I/d cmt bha, /u olish ass , TIH, wash and ream, circ btm u ,POOH.. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~. r _ Customer: Brooks Ran e Petroleum Report No : 36 _ _ °•3:~]0~3 ~-."~~' ~ Well: g . Tofkat 1 Date: 19/03/2008 ~- Sperry drilling sB.-..~~®s Area: North Slope Depth 13173 ;~ Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: CMT AK-AM-5672885 Report For: Mr Jack Daily Cost $3,075 - ';`~ --: ~~, Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas" na unit: 0 unit: ( 15 units @ 6120 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 38 spm Flow rate 188 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 380 psi ~- Mud Wt In 10.10 ppg Visc 154 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.10 ppg PV 50 cP YP 20 Ibs/100ft2 Gels 11 \ 23 \ 24 MBT pH Sd - - - . ~_; `` Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 Total Revs on Bit: Footage for Bit Run 9054 T Y~' Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover LbS to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST ' <r.. Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg - '~! ~ `d Depth Gas in units Max Background to to to t0 i0 GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot :` A `i 24 hr Rec~ Circulate and r/u for cmt. S of isolation lu ooh, s of shoe lu ooh, circ and clean finish POOH... ;;a a :c '.` Logging Engineer: Steven Jenkins / Ed Jones '' 10000 units = 100% Gas In Air '. Customer: Brooks Range Petroleum Report No.: 37 _ ~~~''~''~~~ '"~ Well: Tofkat 1A Date: 20/03/2008 ;,` Sperry or~n:~g Srerv7ces Area: North Slope Depth 3897 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $3,075 '3 :, . ,. .: F Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pump and Flow Data Pumps 0 spm Flow rate o gpm ~' '':~ Gas" na unit: 0 unit: ( 15 units @ 6120 ) Pump Capacity 4.01 gps °,;f ( ) Pump Liner & Strk na in. # ~, Sample Quality x Good ~ Fair Poor Pump Pres: 0 psi Mud Wt In 9.90 ppg Visc 156 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg Mud Wt Out ppg PV 49 cP YP 23 Ibs/100ft2 Gels 11 \ 22 \ 25 MBT pH Sd % " ; Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.77© 3 >~~ Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run t` Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm = Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ;`' ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS '~ Depth Gas in units Chromatograph in ppm :` Max Background C1 C2 C3 C4 Tot C5 Tot to _:~ to r., t0 t0 3, t0 't . il ~ _ 24 hr Rec~ Test BOP's, m/u BHA, load nuke sorces, TIH ... ~' IT> Yy J 2 ~' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 38 - _ ~ i'®~'` ~°' ~ Well: Tofkat 1A Date: 21/03/2008 Sperry drilling Se.-..ices Area: North Slope Depth 3897 - Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Cmt Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger's Morning Report Daily Cost $3,075 - ~' Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 0 spm Flow rate o gpm Gas'` na unit: 0 unit: ( 15 u nits @ 6120 ) Pump Capacity 4.01 gps -° ( ) Pump Liner & Strk na in. ' "' "- Sample Quality x Good ~ Fair Poor Pump Pres: o psi _ ; N1ud Wt In 10.00 ppg Visc 152 secs API Tilt ml HTHP 3.0 ml Mud Wt at Max Gas ppg ~ Mud Wt Out ppg PV 49 cP YP 22 Ibs/100ft2 Gels 10 \ 19 \ 25 MBT pH Sd ''." Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ': Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm _ Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST "r Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg t1~ r° ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to -~ to 'a 24 hr Rec< ~-b TIH to to cmt, none found, circulate and POOH, la down MWD, m/u bha w/cmt stin er and TIH.. Circ& Clean '~` cement, and pull up hole, circ & clean hole, POOH... } ~ ` °p _.; ~` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Range Petroleum Report No.: 39 ' _ __ ~~~°~' ~ ~ Well: Tofkat 1A Date: 22/03/2008 Sp®rry drilling Services Area: North Slope Depth 4732 Lease: Exploration Footage Last 24 hrs: 762 Rig: Nabors 27 Rig Activity: Short Trip Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 . ~. -~ ,, Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 105 ft/hr ( 414 ft/hr @ 4245 ) Pumps 0 spm Flow rate 0 gpm i- :' Gas* 4 unit; 75 unit: ( 104 units @ 4550 ) Pump Capacity 4.01 gps ( ) Sample Quality x Good ~ Fair Poor Pump Liner & Strk na in. Pump Pres: 0 psi = Mud Wt In 9.90 ppg Visc 179 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg '{ ' i Mud Wt Out 9.90 ppg PV 60 cP YP 27 Ibs/100ft2 Gels 17 \ 38 \ 0 MBT pH Sd % ' `,' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 '- \Nt On Bit: 2.00 RPM: 70 Hrs. On Bit: 9.10 Total Revs on Bit: Footage for Bit Run 762 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 4732 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CIySt 30 % SLTST 10 % SD Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ;~ GAS PEAKS -r Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to - ~~° to _ to __ 3C to to ~~ `~ 24 hr Rec~ TIH, be in kick off, drillin ahead... short tri k+ 1 ^ , f^.~ .w, %-` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e P l t R rt N ~ , ~ g e ro eum epo o.: 40 ~~~~~ ~~~ ~ 1~ ~ ~ Well: Tofkat 1A Date: 23/03/2008 Sperry drilling Services Area: North Slope Depth 6066 Lease: Exploration Footage Last 24 hrs: 1334 Rig: Nabors 27 Rig Activity: Short Trip ~' ' Job No.: AK-AM-5672885 Report For: Mr JackKeener y Mudlogger s Morning Report s ., ..._ Daily Cost $3,075 F - k Current 24 hr Avg 24 hr Max Pump and Flow Data ~.` R.O.P. 125 ft/hr 55.5 ft/hr ( 425 ft/hr @ 5855 ) Pumps 64/64 spm Flow rate 542 gpm =` Gas* 245 unit: 110 unit: ( 834 units @ 5873 ) Pump Capacity 4.01 gps ` '~ ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 2974 psi 'n; _~ _ Mud Wt In 10.10 ppg Visc 119 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.10 ppg PV 49 cP YP 23 Ibs/100ft2 Gels 13 \ 26 \ 0 MBT pH Sd ~" Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 i~ Wt On Bit: 2.00 RPM: 70 Hrs. On Bit: 15.50 Total Revs on Bit: Footage for Bit Run 1334 - ~ _~ Trip Depth: ft Trip Gas: _ Mud Cut: ppg Trip CI: ppm Short Trip Depth 4732 ft Short Trip Gas: 429 Mud Cut: na ppg Short Trip CI: ppm ~_{ k Magnet Recover Lbs to to Feet of Fill on Bottom: ft ~;a ~ Current Lithology: 40 % CIySt 40 ~,~ SLTST 20 SD % ~% ~,.~:. Connection. Gas and Mud Cut 5873 ft 834 units 9.9 ppg ft units ppg ft units ppg t. 5683 ft 429 units 9.9 ppg ft units ppg ft units PP9 g ft units ppg ' ft units ppg ft units PP9 ft units ppg ft .units ppg ft units ppg '% w..; _ _ ~' ~; s, ~ ~. GAS PEAKS Depth Gas in units Chromatograph in ppm ~` Max Background C1 C2 C3 C4 Tot C5 Tot ~~ z to ` to to to to x =Y ~ - 24 hr Rec~ 4 Drillin Ahead, short tri s as needed, um re air, drillin ahead... -g Logging Engineer: Steven Jenkins / Ed Jones 10000 units. = 100% Gas In Air : ~~- , t 7 ~- ~ ~ Customer: Brooks Ran e Petroleum Re ort No : 41 _ g p . ~3 ~~ ~ ~~ ~~ ~~'~~ Well: Tofkat 1A Date: 24/03/2008 Sperry Drilling Services Area: North Slope Depth 7778 Lease: Exploration Footage Last 24 hrs: 1712 Rig: Nabors 27 Rig Activity: Short Trip ' Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger s Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. 82 ft/hr 71.3 ft/hr ( 339 ft/hr @ 7113 ) Pumps 64/64 spm Flow rate 535 gpm '- Gas* 47 unit: 68 unit; ( 144 units @ 6599 ) Pump Capacity 4.01 gps <~` ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 3185 psi Mud Wt In 10.00 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg ` Mud Wt Out 10.00 ppg PV 51 cP YP 27 Ibs/100ft2 Gels 13 \ 25 \ 0 MBT pH Sd ,:~. , Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 _ Wf On Bit: 2.00 RPM: 50 Hrs. On Bit: 26.50 Total Revs on Bit: Footage for Bit Run 3046 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7778 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 °/< CIySt 40 '~~ SLTST 10 '~ SD ~% Connection Gas and Mud Cut `_r ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg f GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot a ~~ to , '~ to ~ to _ to ~ 5 to ~ 24 hr Rec~ . ' Drillin Ahead, short tri as directed, drillin ahead..... v '~ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum R t N 42 _ ~~ " ~ ~ ~ 3 -~ ~ '_' ~ ~ ~~ g epor o.: Wel I: Tofkat 1 A Date: 25/03/2008 Sperry Grilling Services Area: North Slope Depth 9582 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1804 Rig: Nabors 27 Rig Activity: Drilling Ahead Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 ~' ~; Current 24 hr Avg 24 hr Max R.O.P. 279 ft/hr 75.2 ft/hr ( 355 ft/hr @ 8626 ) Gas'' 72 units 68 unit: ( 165 units @ 9358 ) ( } Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 64/64 spm Flow rate 521 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Press 3218 psi Mud Wt In 9.90 ppg Visc 86 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 32 cP YP 17 Ibs/100ft2 Gels 11 1 25 \ 0 MBT pH Sd - - - Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 '. 1~~1f On Bit: 10.00 RPM: 50 Hrs. On Bit: 37.10 Total Revs on Bit: Footage for Bit Run 4850 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnet Recover LbS to to Feet of Fill on Bottom: ft i nr - Current Lithology: 50 % CIySt 40 % SLTST 10 % SST ;. _ _. - Connection Gas and Mud Cut _ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg _ ft units ppg ft units ppg ft units ppg } ft units ppg ft units ppg ft units ppg .. ;,, s `~ GAS PEAKS ' Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to 24 hr Rec~ Drillin Ahead, short tri 20 Stnds, drillin ahead..... ~: f ; Logging Engineer: Steven Jenkins ! Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum R rt N 43 __ ~~-~~~ 3~ ~ s' ' ,~~~ g epo o.: Well: Tofkat 1A Date: 26/03/2008 Sperry Ori0ling services Area: North Slope Depth 11298 udfogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1716 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 " Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 114.4 ft/hr ( 392 ft/hr @ 10436 ) Gas' 4 unit: 68 unit: ( 512 units @ 10175 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in Pump Pres; na psi Mud Wt In 10.00 ppg Visc 85 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg ;g Mud Wt Out 10.00 ppg PV 31 cP YP 22 Ibs/100ft2 Gels 15 \ 28 \ 34 MBT_pH Sd _' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 b~Il On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm s Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K pprn Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST ' Connection Gas and Mud Cut ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ;i y~ ~ ~ 'y GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to a ,~, ;; `_i 24 hr Rec~ Drillin ahead, TD well 11298 ft. Circulate and Clean well, POOH. - 3 {',~ .. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air `1 Customer: Brooks Range Petroleum Report No : 44 _ ~~'_~ ~~ J J~~~~~' ~ . Well: Tofkat 1A Date: 27/03/2008 sP6~.-y ~~iBling s@rvic®s Area: North Slope Depth 11298 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 - `' r ::;.. Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na fUhr @ ) Gas` na unit: na unit: ( na units @ ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi ' Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 33 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd ` ;~~ Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 ~~ Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 , ' ~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm _' Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft ' Current L~thology 50 ~/~ CIySt 40 % SLTST 10 % SST °~ '~7 ' Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ "~ ~ GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to ~ ~ to to °,~=° `~ 24 hr Rec~ Finish POOH, Test BOP's, TIH , Sli and Cut.... x i !, Logging Engineer: Steven Jenkins / Ed Jones '' 10000 units = 100% Gas In Air Customer: Brooks Ran e Petr leum R rt N 45 _ _ _ g o epo o.: ~~~~'~ ~~~~~ ~~""~1 Well: Tofkat 1A Date: 28/03/2008 =: Sperry o.-~n~~g se.-..~C~s Area: North Slope Depth 11298 ~~ Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Circ& Cond ' Job No.: AK-AM-5672885 Report For: Mr JackKeener Mudlogger s Morning Report Daily Cost $3,075 rt Current 24 hr Avg 24 hr Max Pump and Flow Data ?Y R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm ~` Gas" 4 unit: na unit: ( na units @ ) Pump Capacity 4.01 gps ~~ ( ) Pump Liner & Strk na in s Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 32 cP YP 19 Ibs/100ft2 Gels 15 1 27 1 32 MBT pH Sd % ~. !. _, Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 V`It do Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: Footage for Bit Run 6566 :, _ ~, Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm ,t Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 '/< CIySt 40 -. SLTST 10 _ SST ~e ~_ Connection Gas and Mud Cut ~~ ft units ppg ft units ppg ft units ppg 3 .5' - ft units ppg ft units ppg ft units ppg " ~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg `_ ~ ~~ GAS PEAKS '~ ~ Depth Gas in units Chromatograph in ppm sx !'t Max Background C1 C2 C3 C4 Tot C5 Tot to to t0 ~t t0 s t0 _ _ x 24 hr Rec~ } TIH, dis lace mud, circulate and condition... z` i „ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ~' ,~. ~ ~~ Customer: Brooks Ran e Petroleum Re ort N 46 , g p o.: ~~~,~~~~ ~j ~ Well: Tofkat 1A Date: 29/03/2008 ~: Sp®rry Grilling S®rvices Area: North Slope Depth 11298 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Set Cmt.. Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Larry Meyers i Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm Gas" 4 unity na unit; ( na units @ ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres; na psi i Mud Wt In 10.00 ppg Visc 80 secs APl felt ml HTHP ml Mud Wt at Max Gas 10.0 ppg -5 Mud Wt Out 10.00 ppg PV 16 cP YP 38 Ibs/100ft2 Gels 26 \ 28 \ 33 MBT_pH Sd ." Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 ~. ~ Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 47.00 Total Revs on Bit: _ Footage for Bit Run 6566 ,, _ _ _ _ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 123 Mud Cut: n a ppg Short Trip CI: 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft ~.; Current Lithology 50 % CIySt 40 % SLTST 10 % SST o i° Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg w ft units ppg ft units ppg ft units ppg GAS PEAKS ~~ Depth Gas in units Chromatograph in ppm ~'. Max Background C1 C2 C3 C4 Tot C5 Tot to to to to y to {a .. .~ ~; 24 hr Reca TIH with 2 7/8 in tubin ,circulate and ri u and set cement lu ,POOH and I/d tubin and wait on cmt.. ~: '` Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 'P.: ,,,~ _ ._ Customer: Brooks Ran e Petr l R rt N 47 ~ -_~ ~ _ g o eum epo o.: °~3~ ; ~? j ~ ~ ~~.~ ~ ~ Well: Tofkat 1 B Date: 30/03/2008 Srp®rry Grilling Services Area: North Slope Depth 4200 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Ftow Data 'R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Pumps na spm Flow rate na gpm iGas'' 4 unit: na unit: ( 10 units @ ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi ,, Mud Wt In 10.00 ppg Visc 180 secs API felt ml HTHP ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 58 cP YP 29 Ibs/100ft2 Gels 16 1 38 1 42 MBT_pH Sd _ . I __ - Bit No.: 1 Type: PDC Bit Size: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 4^It On Bit: 10.00 RPM: Hrs. On Bit: Total Revs on Bit: _ Footage for Bit Run 1 ~ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST ~ ~ Connection Gas and Mud Cut ft i . un ts ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ' :~ ft units ppg ft units ppg ft units ppg t ; Depth to ~ _~=~ to to to to >K GAS PEAKS Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot ~. 24 hr Rec. Finish cmt, Test BOP's, M/U new BHA, load nukes, TIH, Shallow Test, contd TIH , s Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas -n Air _ Customer: Brooks Range Petroleum Report No.: 48 '~ "~' ~ ~ ~ ~ ~ ' ~ ~`J Wel I: Tofkat 1 B Date: 31 /03/2008 ' Sperry drilling Services Area: North Slope Depth 5502 Lease: Exploration Footage Last 24 hrs: 1302 Rig: Nabors 27 Rig Activity: Short Trip ' Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger s Morning Report Daily Cost $3,075 - .~.. __ ___ - Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 108.5 ft/hr ( 515 ft/hr @ 4519 ) Pumps 62/67 spm Flow rate 546 gpm ~ Gas' 11 unit: 95 unit: ( 123 units @ 5405 ) Pump Capacity 4.01 gps 4 ( ) Pump Liner & Strk na in. ~' Sample Quality x Good ~ Fair Poor Pump Pres: 2920 psi - Mud Wt In 10.00 ppg Visc 125 secs API flit ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg fV4ud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT_ pH Sd __ ~_. , Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: _ 5.60 Total Revs on Bit: Footage for Bit Run 1302 ;. _ _ ~ -- Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm - Magnet Recover Lbs to to Feet of Fill on Bottom: ft - x Current Lithology: 50 % CIySt 40 % SLTST 10 % SST °'° '~~ - - Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg -. _i GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to hh ~ ,. -- ~ <_ 24 hr Rec< Drill Cement, kick off ,drilling ahead, short trip ~ 5502 ft =,< Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 5:: - _ x - Customer: Brooks Ran a Petroleum Re ort No : 49 . Well: Tofkat 16 Date: 01/04/2008 Sperry drilling S@rvices Area: North Slope Depth 7975 Lease: Exploration Footage Last 24 hrs: 2473 Rig: Nabors 27 Rig Activity: Short Trip ' Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Mudlogger s Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. 211 ft/hr 103 ft/hr ( 809 ft/hr @ 7814 ) Pumps 57/67 spm Flow rate 525 gpm Gas'' 121 unit: 88 unit: ( 250 units @ 7855 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 3377 psi Mud Wt In 10.00 ppg Visc 125 secs API Tilt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg ' ,$ Mud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 1 32 \ 40 MBT pH Sd ,' ' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 b~Jt On Bit: 12-15K RPM: 60 Hrs. On Bit: 16.70 _ Total Revs on Bit: Footage for Bit Run 3775 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7975 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm i Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology~ 40 % CIySt 50 SLTST 10 ',~~ SST °io s Connection Gas and Mud Cut ft units ppg ft units .ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ppg ppg ppg ft ft ft ft units units units units ppg ppg ppg ppg Depth to Gas in units Max Background GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to to >= 24 hr Rec~ A~ drillin ahead, short tri 7975 ft r ~> 'L`i f vY .. ' Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air ' Customer: Brooks Ran e Petroleum Re ort No 51 J ~-~ ~ ~3~ ~~~~~~ Well: g p .: Tofkat 1 B Date: 03/04/2008 '; sPB.-r-y ~ril0ing Services Area: North Slope Depth 10785 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 1293 Nabors 27 Rig Activity: CO AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 185 ft/hr 161.6 ft/hr ( 470 ft/hr @ 9673 ) Gas* 4 unit: 94 unit; ( 250 units @ 9915 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 61/68 spm Flow rate 547 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in Pump Pres: 3786 psi ' . Mud Wt In 10.00 ppg Visc 127 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 52 cP YP 26 Ibs/100ft2 Gels 18 \ 37 \ ## MBT_pH Sd Bit No.: 1 Type: PDC Bit Size: Wt On Bit: 12-15K RPM: 60 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 33.00 Total Revs on Bit: Footage for Bit Run 5292 Trip Depth: ft Trip Gas: Short Trip Depth 9492 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 141 Mud Cut: na ppg Short Trip CI: 43k ppm to Feet of Fill on Bottom: ft Current Lithology: 40 % SST 40 % SLTST 20 % SD Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg '~ Depth Gas in units Max Background to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to ~~ to to `' 24 hr Rec~ Drillin ahead, losin mud, well flowin ,increase MW, decrease MW, CO, Pum LCM around.. +~ <; f.L Logging Engineer' Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Connection Gas and Mud Cut ft units ppg ft units ppg ft units pP9 ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units pg ft i un is pg t i un is pg " ~ GAS PEAKS Depth Gas in units Chromatograph in ppm ' Max Background C1 C2 C3 C4 Tot C5 Tot ~ to . to to to to 24 hr Rec~ ~ ~ i Drilling Ahead.... Customer: Brooks Ran P tr l R rt N 52 _ ___ _ ~~-~~~ ~1 ~ ~ ~ ~ ~' \~ Well: ge eum e o epo o.: Tofkat 16 Date: 04/04/2008 Sperry oraoi~ng sB.-vices Area: North Slope Depth 12442 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 1707 Nabors 27 Rig Activity: drilling ahead AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg R.O.P. 113 ft/hr 71 ft/hr ( Gases 58 unit: 62 unit: ( ( Sample Quality x Good ~ Fair 24 hr Max 226 ft/hr @ 12216 ) 113 units @ 11962 ) ) Poor Pump and Flow Data Pumps 57/65 spm Flow rate 522 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi Mud Wt In 9.80 ppg Visc 120 secs API Felt ml HTHP 3.3 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 9.90 ppg PV 39 cP YP 26 fbs/100ft2 Gels 20 \ 31 \ 37 MBT_pH Sd Bit No.: 1 Type: PDG Wt On Bit: 8.00 RPM: 90 Hrs. Bit Size: On Bit: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 43.10 Total Revs on Bit: Footage for Bit Run 6999 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: na ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 60 % SH 30 % SLTST 10 % SD Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: B k R P t l R N =7~~~_~1 ~ ~~ ~ ~ ~ ~ ~ roo ange s e ro eum eport o.: 53 Well: Tofkat 1 B Date: 05/04/2008 Sperry Drilling s@.-..~cBS Area: North Slope Depth 13770 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1328 Rig: Nabors 27 Rig Activity: drilling ahead Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 113 ft/hr 126.5 ft/hr ( 338 ft/hr @ 13296 ) Gas* 42 unit: 58 unit: ( 440 units @ 13200 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 53/62 spm Flow rate 493 gpm Pump Capacity 4.01 gp Pump Liner & Strk na in Pump Pres: 3759 psi s . ' Mud Wt In 9.80 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg N1ud Wt Out 10.10 ppg PV 49 cP YP 27 Ibs/100ft2 Gels 20 \ 33 1 40 MBT_pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 `Nt On Bit: 8.00 RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 8327 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft -- Current Lithology: 30 % SH 40 % SLTST 30 % SST - Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg - P = ;`t - GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C 1 C2 C3 C4 Tot C5 Tot 13330 to 13580 153 44 11 1 1 1 to to to to F 24 hr Rec~ Drillin Ahead.... ;} k '- Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 9 Customer: Brooks Ran e Petroleum R rt N 54 ,~ , ~ ~ -3_~~~'~~~~~~ ~ g epo o.: Well: Tofkat 1B Date: 06/04/2008 Sp®rry ®rilling Services Area: North Slope Depth 15099 Lease: Exploration Footage Last 24 hrs: 1329 Rig: Nabors 27 Rig Activity: drilling ahead Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 2 4 hr Avg 24 hr Max Pump and Flow Data R.O.P. 133 ft/hr 126.5 ft/hr ( 226 ft/hr @ 14441 ) Pumps 52/65 spm Flow rate 491 gpm Gas` 4 unit; 47 unit: ( 178 units @ 14478 ) Pump Capacity 4.01 gps Sample Quality x Good ( ) ~ Fair Poor Pump Liner & Strk na in. Pump Pres: 3840 psi Mud Wt In 9.90 ppg Visc 11o secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 45 cP YP 24 Ibs/100ft2 Gels 17 \ 32 \ 40 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wf On Bit: 8.00 RPM: _ 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 9656 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft 1 ", 24 hr Rec~ Drilling Ahead.... ~;:~ 3 Current Lithology: 30 % SH 40 % SLTST 30 % SST % Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re rt N 55 _ ~ ~ g po o.: ~~ ~~ J 3~ ~~~~ Well: Tofkat 1 B Date: 07/04/2008 Sperry drilling servecas Area: North Slope Depth 15575 Lease: Exploration Footage Last 24 hrs: 476 Rig: Nabors 27 Rig Activity: POOH Mudlogger's Morning Report Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 ~.~ . - - _ _ -. Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 33 ft/hr ( 236 ft/hr @ 15039 ) Pumps na spm Flow rate na gpm Gas* na unit: 0 unit: ( 46 units @ 14815 ) Pump Capacity na gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: na psi Mud Wt In 9.90 ppg Visc 110 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 44 cP YP 20 Ibs/100ft2 Gels 17 \ 35 \ 42 MBT_ pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 67.00 Total Revs on Bit: Footage for Bit Run 10134 _ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm ;; Magnet Recover Lbs to to Feet of Fill on Bottom: ft t - Current Lithology: 80 °~ SH 20 % SLTST % SST ., Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ;: t fi GAS PEAKS *~ Depth Gas in units Chromatograph in ppm ;VS Max Background C1 C2 C3 C4 Tot C5 Tot ~' to to ~~ to to 24 hr Rec~ R`~ Drilling ahead, reach TD, CO, POOH Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 1-IALI_IF3URT~IV Sperry-Sun _va ~ ~ ~D~ «~~~ ~ HALLIBURTON Sperry Drilling Services ' Brooks Range Petroleum Corporation Tofkat 1 A 1 Surface Data Logging END OF WELL REPORT Brooks Range Petroleum TABLE OF CONTENTS TOFKAT 1 A 1. General Information 2. Daily Summary A. Bit Reports B. Mud Reports C. Show Reports 3. Lithology Summary A. Tops. B. Logs 4. DATA CD 5. Morning Report Brooks Range Petroleum HALLIBURTON Sperry Drilling Services C 1 n i GENERAL WELL INFORMATION TOFKAT1A Company: Brooks Range Petroleum Corporation Rig: Nabors 27E Well: Tofkat 1 A Field: Exploration Borough: North Slope State: Alaska Country: United States API Number: 050-103-20567-01 Sperry-Sun Job Number: AK-AM-0005672885 Job Start Date: March 19 2008 Job End Date (TD): March 26, 2008 Total Depth: TD 11298' MD; 7169' TVD North Reference: True Declination: 22.30° Dip Angle: 80.64° Total Field Strength: 1151.50 NT Date Of Magnetic Data: 16 Feb 2008 Wellhead Coordinates N: North 70° 13' 48.186" Wellhead Coordinates W: West 150° 47' 20.701 " RKB: 33' Ground Elevation: 19.80321' SDL Engineers: Steven Jenkins, Ed Jones Company Geologist: Doug Hastings SSDS Unit Number: 115 Brooks Ra rtge Petrole~..~ m HALLIBURTON Sperry Drilling Services n n 0 L C i_ ~I L C 0 J DAILY SUMMARY Brooks Range Petroleum Corporation Tofkat 1, Tofkat lA, and Totkat 1B 2_ DAILY SUMMARY TOFKAT 1 A 19 Mar Side track well TOFKAT 1 A . POH f/3450'-1053' & UD 2 7/8" DP. Pull wear ring. M/U test joint. Install test plug. Test BOP's. Load nuclear source in smart tools & orient tools before RIH. 20 Mar Make up BHA &RIH. Shallow test tools. Okay. RIH to 3684 & wash in to 4447' to try & tag cement;(not found). Circulate to balance mud. Pump dry job & POH. Lay down smart tools. PN cementing stinger assembly &RIH to 4587'. Circulate clean. Spot a 25 bb1.16 ppg viscous spacer. POH to 4302 & cement with 15 bbl. spacer; 26 bbl. 15.8 ppg cement; & chase with 5 bbl. spacer and rig mud. POH to 3350'. Circulate 2 x B/U. Pump dry job & POH. 21 Mar POH F/3350' & UD cementing BHA & 2 7/8 DP. M/U smart BHA & load source. RIH to 1120'; shallow test tools, then WOC. RIH to 3589' & wash to 3970'. Direction work f/3940'-3970'. Time drill to 4732'MD / 3464' TVD; [ 550 gpm ~ 2600 psi; Tq on 5-6K; Tq off 4-5K; Up wt. 140K; Down wt. 115K; Rotary wt. 110K]. 22 Mar Circ. B/U before short trip out to shoe. Some swab noted f/4447-4225'. Work pipe thru okay to 3875'. Orient tools. RIH washing/reaming last stand to btm. Drilled to 5780' backreaming twice. POH to 5494'. Hole in good shape. RIH with no problem. Drill with one pump to 6067'. 23 Mar Rotate/slide f/6,066-6732'. Circ. B/U. Monitor well. Pump dry job. POH to 4,700'. RIH to 6,542' & wash/ream to btm. Drill to 7,715'. [540 gpm C~ 2950 psi; up wt. 190K,dwn wt.125K, rot. wt. 145K; Tq on 7-8K,Tq off 5-6K. 24 Mar Monitor well. Short trip f/7778-7497'. Hole was slick. Reamed last stand in to 7778' and oriented tools. Slide & rotate to 8630'. Drilled to 8726'. Circ. hole clean. Pump dry job. POH to 6454'. First 1000' 15 to 30 K overpull. Clean. Rest went well. RIH to 8630'. Wash & ream to btm. Drill to 9366';[530 gpmC~32800psi;Tq on 10-11 K;Tq off 8-9K; Up wt. 225K; dwn wt.135K; rot. wt.160K]. 25 Mar Rotate and slide from 9366' to 10536'. Drill ahead to TD 11297'. Back ream stand, MWD working with tool, MWD survey, Circulated 2+ BU until hole was clean. Observed the well, pumped a 20 Bbl Dry job, POOH from 11297' to 8345'. RIH with BOP test. 26 Mar Cont POOH, LD BHA, Test BOPE, RIH to 3750', Slip and Cut drilling line. C Lithologic Summary Brooks Range Petroleum Corpoation Totkat lA 3_ Lithologic Summary Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units Reference Information Below to 2" MD &TVD Mudlogs i C 0 ii n 575- 1288 Guik Base 1288- 2064 MD Permafrost Formation 1272- 1911 TVD Graval: Grey White to Dark Grey, Med to Hard, Quartz, Shale, With Poor Sorted gravel, with loose Consolidation. Clav: LT Gray, Very Soft, Silty, Non Calcareous 2064- 3084 MD West Sagavanirktok Formation 1911- 2620 TVD Clav: LT Gray, Very Soft, Silty, Non Calcareous Graval: Gray, Round, Broken, no cement, quartz. Siltstone: Light gray- brown, Soft, Crumbly, Sub-Angular Poor cement. Clavstone: Light gray, off- White, Soft to Firm, Slightly Calcareous 3084- 6119 MD 2620- 4150 TVD Shale Wall K-5 FORMATION Sandstone: Light Gray, very coare grained, calcite, rounded Very poorly sorted, Ilght grey, moderately hard, very hard, clay Matrix, angular, mica, glauconite, pyretic, calcite, and Quartz. SHALE:Medium gray, lightgray in part, platy, fissile in part, some splintery, trace silty, trace tuffaceous, noncarbonaceous, trace loose sand grains. CLAYSTONE:Lightgray-mediumgray, dark gray,graybrown, platy, silty in part, noncarbonaceous, noncalcareous, grading to shale, some loose sand grains, soft-medium hard. Gravel: Gray, clear, Medium, quartz, prooley sorted, round. Sand: Quartz, Medium coarse grained, Sub-elongated, poorly Sorted, uncemented Light gray to gray, sub angular, mica, glauconite, calcite, Fluorescence: trace, dull yellow, Trace: Slow streaming. Clav: Light gray, very soft, stickey, slightly calcareous, uncemented, blocky, sub angular. Siltstone: Light brown to medium brown, soft firm, blocky, Sub-angular,slighty cement. 0 0 Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units 5938 M D ' 4150-TVD Qannik 2 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky. ' MD TVD Qannik 1 FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, ' 6232 M D 4350 TVD Qannik Base FORMATION Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medlum Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. ' 6232- 8903 M D 4350 TVD C-40 Albian Foresets FORMATION SANDSTONE: White to light gray, and white mottled, veryfine grain,some medium grain, subrounded-subangular, spherical, mmoerate sorting, friable, quartz, poorly cemented with silica cement, some white clay cement,5% visible porosity, 30% moderate dull yellow sample fluorescence, slow milky white cut ' fluorescence, no white light cut, no oil odor, traces of tan stain. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light to Medium Brown, soft firm, blocky, sub angular Blighty calcareous, slightly silky, Fluorescence: yellow cut with fast streaming. Sand: White Clear, Medium Grained, moderatlely sorted, blocky, Quartz, sub rounded, light grey, trace glauconite, no shows. i~ ~~ 1 u Lithologic Summary Brooks Range Petroleum Tofliat lA Depth (ft) ROP Gas Formation Lithology and Remarks ' ~ TVD-ft) ft/hr Units ' 8903 M D 5865 TVD Top Tubidites FORMATION SANDSTONE: Gray, veryfine grain, some medium grain, subrounded, subangular, spherical, friable, quartz, moderate cemented with calcareous cement Flurescence: trace dull white Cut: weak dull white. Clavstone: Light brown, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, ' calcite, sub-rouned,poorly sorted, soft, poorly cemented, blocky, no apparent,no bedding: Flurescence, weak Sand: White Clear, Medium Grained, moderatlely sorted, blocky, ' Quartz, sub rounded, light grey, trace glauconite, no shows. MD ' TVD Top of Turbidites 2 FORMATION SANDSTONE: White, fine crystalline, fine grained, to very fine Grained to medium, sub- rounded to sub angular, morertley sorted, porosity, ' Poor, Fluorescence: trace, dull white Cut dull white Clavstone: Light brown, soft firm, blocky, Slightly bedded, ' Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, poorly sorted, soft, poorly cemented, blocky, no apparent, no bedding: Flurescence, weak ' Sand: White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no shows. ' MD TVD Top of Turbidites 2 Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is weak, with dui white. ' Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, poorly sorted, soft, poorly cemented, blocky, no apparent bedding: Flurescence, none Sand: Trace of White, coarse grained, quartz, sub rounded, sub angular, Poorly sorted, clear, uncemented, glaucointie, fair, no ' shows. 2 Lithologic Summary Brooks Range Petroleum Totkat lA Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units 0 I~ i] ~i CI' MD TVD Top of Turbidites 1 FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Trace of light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 10450MD 6757TVD Top of Turbidites Base FORMATION SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white With a trace of oil stain Clavstone: Light brown to drark gray, soft firm, blocky, Slightly bedded, Slightly calcareous. Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding: Flurescence, weak. Dull white, Cut, moderately streaming Sand: Light gray, fine grained to very fine grained, quartz, sub rounded, moderately sorted, hard, blocky, calcite Shale streakes, porosity trace, Flurescence, moderate, white, Cut, moderately streaming, milky white, with trace of oil stain. 1 0844-1 1 1 21 M D 6967- 7097 TVD HRZ FORMATION with high GAMMA READINGS Siltstone: Light Gray, very coarse grained, to corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white SHALE: Dark gray, platy-papery in part, carbonaceous in part, grading to claystone 1n part, slightly-moderately calcareous, trace sandy in part, very crumbly-firm, Fluorescence, trace Dull white, Cut weak. 3 ' Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units i~ 1 0844- M D 6967 TVD Kalubik FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- ' Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dul white Traceof oll stain. ' SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace Dull white, Cut weak. 11121 MD 7097 TVD K-1 FORMATION ' Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of glauconite. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding.Fluorescence: none, Cut none. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very ' silty, Fluorescence,Dull white, Cut weak. MD TVD Kuparuk C FORMATION ' Sand: Fine crystalline, white, sub rounded to sub angular Poorly sorted, clear, loose, chart, trace of glauconite, porosity Fair, Fluorescence: moderate, Dull yellow, Cut fast straming Dull yellow, with moderate oil stain. Siltstone: Light Gray, very coarse grained, to Corse crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no apparent bedding. SHALE: Gray to Dark gray, slightly calcareous, trace sandy, very ' silty, Fluorescence, Dull white, cut weak. 4 ' Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks (TVD-ft) ft/hr Units ' 11121-11297 MD 7097 7169 TVD LCU FORMATION Sand: White, Fine crystalline, fine grained, to very fine grained Sub rounded, sub angular, moderately sorted, glauconite, Fluorescence, moderately, dull yellow, slow streming with Milkly white, with weak oil stain. Siltstone: Light Gray, very coarse grained, to cores crystalline, calcite, sub-rouned, calicite, soft, poorly cemented, blocky, no ' apparent bedding. SANDSTONE: White, medium grained, to fine grained, sub- Angular, moderately sorted, friable, Porosity, poor, Fluorescence Trace of white, cut is moderately streaming with dui white , Traceof oil stain. SHALE: Gray to Dark gray, platy-papery in part, slightly calcareous, trace sandy in part, very silty, Fluorescence, trace ' Dull white, Cut weak. t 0 5 u Lithologic Summary Brooks Range Petroleum Tofkat lA Depth (ft) ROP Gas Formation Lithology and Remarks ( TVD-ft) ft/hr Units 6 Customer: Brooks man e Petroleum Re ort No : 1 ~~ ' g p . Well: Tofkat 1 Date: 13/02/2008 ~~®wwy ®r-;;;;ng s®rv;c~s .Area: North Shape Depth 1015 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1015 Rig: Nabors ~7 Rig Activity: _ drilling Job No.: AK-AM-X672885 Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 80 ft/hr 118 ft/hr ( 429 ft/hr. @ 870 ) Gas` 0 unit: 2.5 unit; ( 33 units C~ 1004 ) ( ) Sample Quality x Good ~ Fair .Poor Pump and Flow Data Puaraps 2 spm Flow rate 415 gpm Pump Capacity 4.41 gps Purrrop Liner & Strk 6x12 in. Purr~p Pres 1090 psi Mud Wt In 9.60 ppg Visc # 283 secs API fait - ml HTHP Q_0 ml Mud Wt at Max Gas 9.6 ppg Mud Wt Out 9.70 ppg PV 40 cP YP 45 {bs/100ft~ Gels 20 \ 55 \ 0 MBT pH 9.0 Sd °~. Bit No.: 1 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 ~ 1 x 13 x TFA: 0.920 Wt On Bit: 14-Jan RPM: 40 Hrs. On Bit: 8.6 Total Revs on Bit: 1 k Footage foa' Bit Run 1'1)15 Short Trip Depth: ft .Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft ~a n Current Lithology: 80 % CLAY 20 % GRAVEL Connection Gas and Mud Cut ft units ppg tt snits ppg ft units ppg ft units ppg ft t~r~ts ppg ~ft units A~p9 ft units ppg tf a~uruts ppg ~ft units pP9 ft units ppg ti ~.~nits ppg ft units ppg GAS PT~AKS Depth Gas in units Chromatograpfi in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 712 to 730 10 tr 1®09 0 0 0 0 910 to 1005 33 10 3315 0 0 0 0 to to i to 24 hr Rec~ S ud well. Drill to 1015ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas Irn Air 0 ~- Customer: Brooks Ran e Petroleum Re ort No : ^ ~ 2 ~ ~ Well: g Tofkat 1 p Date: 14/02/2008 Sp®rry ®rillir9g ~®rviCBS Area: North Slope Depth 2166 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration ;; Nabors 27 AK-AM-5672885 Footage Last 24 hrs: - 1151 Rig Activity: wiper trip Report For: Larry Myers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 119 ft/hr ( 416 #Uhr C4 1789 Gas" 67 unit: ~ 47 unit: ( 225 units ~ 1873 ( Sample Quality Good Q Fair Poor ) ) ) Pump and Flow Dat~x Pumps 1+2 spm Ff~:w rate 630 gpm Pump Capacity 4.41 rJps Pump Liner & Strk 6x12 in. Pump Pres 2300 psi Mud Wt In 9.40 ppg Visc 152 secs API filt 7.0 rnl HTHP 0.0 ml Mud Wt at Max Oas 9.6 ppg Mud Wt Out 9.60 ppg PV 21 cP YP 40 Ibs/100ft2 Gels 20 \ 65 \ 0 MBT pH 8.8 Sd 4.5 ~;, Bit No.: 1 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 22.9 Total Revs on Bit: Footage fear Bit Run 216 Short Trip Depth: 2166 ;;ft Trip Gas: Short Trip Depth ;-ft Short Trip Gas: Magnet Recover Lbs : to Mud Cut: ppg Trip CI: ppr-n Mud Cut: ppg Short Trip ~I: pp~on to Feet of Fill on Bottom:. t"-t Current Lithology: 100 °~ CLAY °i , C Connection Gas and Mud Cut ft units ppg ft units ~ ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg t ~ Depth Gas in units Max Background 1513 to 1676 127 32 1795 to 1820 185 79 1867 to 1888 225 80 GAS PEA~CS Chromatograph in ppm C1 02 C3 C4 Tot C5 Tot 6287 0 0 0 f no data 4676 0 0 0 (' 1955 to 1976 209 47 8982 ~3 0 0 e to 24 hr Rec~ Drill 1015ft to 2166ft, wiper tri Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Aar ~ ~ Customer: : ~ 3 Brooks Ran e Petroleum Re ort No Well: g Tofkat 1 p . Date: 15/02/2008 Sp®rry ®rillir-s~ S®rvices Area' North Slope Depth 2733 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 2r AK-AM-5672885 Footage Last 24 hrs:: 567 Rig Activity:. Drilling Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 40 ft/hr 1-0.2 ft/hr ( 187 ft/hr @ 2643 .Gas` 140 unit: 70 unit; ( 181 units @ 2644 ( Sample Quality Good Q Fair .Poor ) ) ) Purttp and Flow Data Pumps 1+2 spm Flow rate 710 c~pm Pump Capacity 4.41 fps Pump Liner i~ Strk 6x12 in. Pump Pres 2960 psi Mud Wt In 9.60 ppg Visc 174 secs API Tilt 7.0 ml HTHP 0.0 ml Mud Wt at Max C-~as 9.6 ppg Mud Wt Out 9.60 ppg PV 20 cP YP 38 Ibs/100ft2 Gels 19 \ 60 \ 0 MBT pH 8.5 Sd 2.5 °',, Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 22.00 RPM: 52 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.942E 10.2 Total Revs on Bit: Footage for Bit Run 56~ ~~ _ Trip Depth: 2166 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet.Recovei Lbs to 299 Mud Cut: ppg Trip CI: ppr~a Mud Cut: ppg Short Trip CI: ppr~ to Feet of Fill on Bottom: ~ ,~_ Current Lithology: 50 % CLAY 40 % CLYST 10 % SLTST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units _ppg ft units ft units ft units ft units ppg ft units ppr~ ppg ft units ppg ppg ft units ppc,~ ppg ft units ppc,~ ~, - ,; Depth Gas in units Max Background 2350 to 2360 93 55 2434 to 2453 103 75 2534 to 2549 153 70 GAS PEd4KS Chromatograph in ppm C1 G2 C3 C4 Tot C5 Tot 6047 28 0 0 0 6418 32 0 0 0 8363 29 0 0 0 2596 to 2675 181 72 12833 27 0 0 0 to ~ - 24 hr Rec~ Drill to 2166ft, POH for bit than e. RIH bit#2. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = ~ 00% Gas In Aga' Customer: Brooks Range Petroleum Report No.: 4 Well: Tofkat 1 Date: ~ 16/02/2008 sp®r-~-~ ®w~tt~.,~ s®.-.o~~~~ Area: North Slope Depth 3911 Lease: Exploration Footage Last 24 hrs: 1178 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: Jack Keener Mudlogger's Morning Report Daily Cost $3,075 05:00 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 128 ft/hr ( 336. ft/hr C~ 3127 ) Pumps 176 spm Flos~v rate 728 gpm Gas' na unit: 125 unit: ( 325 units C°3 2933 ) Pump Capacity 4.41 cJps ( ) Pump Liner & Strk 6x12 in. Sample Quality Good Q Fair Poor Pump Pres: 3780 psi Iviud Wt In 9.60 ppg Visc 165 secs API filt 7.0 m! HTHP 0.0 ml Mud What Maras 9.6 ppg Mud Wt Out 9.70 ppg PV 17 cP YP 37 Ibs/100ft2 Gels 28 \ 70 \ 0 MBT pH 9.5 Sd 1.25 ®!, Bit No.: 2 Type: Milltooth Bit Size: 12 1/4 Jets: 3 x 18 1 x 13 x TFA: 0.9420 Wt On Bit: 40.00 RPM: 85 Hrs. On Bit;. 21.9 Total Revs on Bit: Footage f~ Bit Run 1745 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip ~I: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: tt Current Lithology: 60 % CLAY 40 % GRAV EL Connectio n Gas and Mud Cut 2936 ft 325 units 9.6 ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg Depth Gas in units Max Background 2930 to 2935 325 204 3272 to 3290 2b6 165 to 3691 to 3705 285 45 3791 to 3800 188 60 24 hr Rec~ Drill to 3910ft. Circ hole clean. Wiper GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 18898 324 52 0 0 26268 0 0 0 0 12386 63 13 0 0 14000 64 7 0 0 tri Logging Engineer: Steven Jenkins /Ian Johnstone '' 10000 units = 100% Gas In pair Customer: Brooks Ran e PE troleum Re ort No : 5 I~t Well: g Tofkat 1 p Date: 17/02/008 Sp®rry ®.-ou~~,g ~®rvices Area: North Slope Depth 3911 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Run Casing AK-AM-5672885 Report For: Jack Ke;~ner Daily Cost $3,05 Current 24 hr Avg' 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C~ Gas` - na unit: unit: ( units C°3 ( Sample Quality Good ~ Fair Poor ) ) ) Pump and Ftow Data Pumps 176 spm Flow rate 728 gpm Pump Capacity 4.41 gps Pump Liner & Strk x12 in. Pump Pres: 3780 psi tviud Wt In 9.70 ppg Visc 8s secs API filt 7.6 ml HT~-IP 0.0 ml Mud Wt at Max Gas 9.~ ppg Mud Wt Out 9.70 ppg PV 27 cP YP 23 Ibs/100ft2 Gels 13 \ 55 \ 73 MBT ### pH 8.5 Sd 1.25 °! Bit No.: 2 Type: Milltooth Bit Size: Wt On Bit: 40.00 RPM: 85 Hrs. On Bit: 12 1/4 Jets: 3 x 18 1 x 13 _x TFA: 0.9420 21.9 Total Revs on Bit: Footage for Bit Run 1745 Trip Depth: 3911 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to 1272 Mini Cut: ppg Trip CI: ppm Mu€tl Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 %° GRAVEL ~/° % °f~~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to GAS PEAKS Chroxnatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to .~ 24 hr Rec~ Wi er tri . Circ hole clean. POH. Run casin Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas In Air Customer: Brooks Ran e Petroleum Re ort No : Ew _ `"`~ "`'~ g p . . Well: Tafkat 1 Date: 18/02x'2008 sP®r-ry ®.-;u..,9 s®wvio~s Area: North Slope Depth 39 1 Mudlogger's Morning Report .Lease: Exploration Footage Last 24 hrs: (~ Rig: Nabors 27 Rig Activity: Gasping Job No.: AID-AM-5672885 Rep©rt For: Jack Keener Daily Cost $3,0-75 Current 24 hr Avg- 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C~ ) Gas" na unit: unit: ( units @ }! ( ) Sample Quality Good ~ Fair Poor Pump and Flow Data Pumps spm Flow rate gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: psi Niud Wt In 9.70 ppg Visc 55 secs API fi{t 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9x..7 ppy Mud Wt Out 9.70 ppg PV 19 cP YP 7 Ibsd100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 ° , Bit No.: Type: Bit Size: "Jets: x x x TFA~ Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Rur~„ Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % CLAY 40 % GRAVEL % % ~ _, Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft -units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background Ct C2 C3 C4 Tot. C5 Tot to to to to to 24 hr Rea Run /cement casin Logging Engineer: Steven Jenkins /Ian Johnstone 1000© units = 100°Jo aas Irt Air Customer: Brooks Ran e Pe'roleum R rt N 7 ~`°`t'°-- - g epo o.: Well: Tofkat 1 ®ate: 19/02/~C08 sp®rry ®r;'rer,s ~~~v~c~s Area: North Slope Depth 391 udlogger's Morning Report Lease: Exploration Footage Last 24 6~rs: 0 Rig: Nabors 27 Rig Acti~rity: BC)F~ Job No.: AiK-AM-5672885 Report For: Jack Keener - Daily Cost $3,®T Current 24 hr Avg 24 hr Max R.O.P. na ft/hr ft/hr ( ft/hr C~3 ) Gas" na unit: unit: ( units C~3 ) ( ) Sample Quality Good ~ Fair Poor Purnp and Ffowv Data Pumps spm Flow rate gpm Pump Capacity ~f-.41 gps Pump Liner & Strk ~rx12 in. Pump Pres: psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 ml Mud Wt at Max Gas 9.~ ppg Mud Wt Out 9.70 ppg PV 19 cP YP 7 IbsJ100ft2 Gels 1 \ 2 \ 0 MBT pH 9.0 Sd 0.25 Bit No.: Type: Bit Size: Jets: x x x TFA= Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: ID Footage for Bit Run r Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mucci Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft x; Current Lithology: 60 % CLAY 40 % Gi~AVEL °~, %, ~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units Pp9 ~: GAS PEAKS Depth Gas in units Chro~natograph in ppm Max Background Ct C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ cement casin . N/U BOP. Test BOP Logging Engineer: Steven Jenkins /Ian Johnstone '' 10000 units = 100% G as In Air Customer: Brooks Ran e Petroleum Re ort No : t3 _ ~ ~ ` ~ g . p Well: To#kat 1 Date: 20/02d~ 008 ~p®rry ®re'a~r9~ s~r~~c~s Area: North Slope Depth 39~ 1 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: Ol Rig: Nabors 27 Rig Activity: Circr~lti~te Job No.: AK-AM-5672885 Report For: Jack Ife:ener Daily Cost $3,05 Current 24 hr Avg 24 he Max R.O.P. na ft/hr ft/hr ( ft/hr ~ ) Gas* na unit: unit: ( units C°3 ) ( ) Sample Quality Good ~ Fair Poor Pump and Fiow Data Pumps 120 spm Flow rate .526 fpm Pump Capacity 4.41 gps Pump Liner & Strk tix12 in. Pump Pres; 920 psi Mud Wt In 9.70 ppg Visc 55 secs API filt 5.0 ml HTHP 0.0 m! Mud Wt at Max Gas ~_7 ppg Mud Wt Out 9.70 ,ppg PV 19 cP YP 7 Ibsl'100ft2 Gels 1 \ 2 \ 2 MBT pH 9.0 Sd 0.25 Bit No.: 3 Type: HTC GTi Bit Size: 8 1!2 Jets: x x x TFA~ OPEP~ Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: pp~n Short Trip Depth ft Short Trip Gas: Mud Cut: _ppg Short Trip CI: ppen Magnet Recover Lbs to to Feet of Fill on Bottom: tt ;~ ~~. Current Lithology: 60 % CLAY 40 % GRAVEL % % `~ ~: Connection Gas and Mud Cut ft units ppg ft units ppg ft units pps~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg a GAS PEAKS Depth Gas in units Chroma3ograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< Test BDP. RIH. M/U i e, RIH and drill cement, float and shoe to 3911ft. Dis lace to OBM Logging Engineer: Steven Jenkins /Ian Johnstone * 10000 units = 100% was In fir r~ ~, ~ Customer: Brooks Ran e Petroleum R t N 9 ~ ~ ~ g epor o.: Well: Tofkat 1 Date;: 21/02/201CJ8 s~®rry ®r-.u®n9 S®rvicBS Area: North Slope Depth 4480 udlogger's Morning Report 05:00 Lease: Exploration Footage Last 24 hrs,:: 569 Rig: Nabors 27 Rig Activity; drillings Job No.: AK-AM-5672885 Report For_ Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 320 ft/hr 213 ft/hr ( 373 ft/hr C~ 4079 ) Gasp 113 unit; 68 unit: ( 139 units @ 4323 } ( ) Sample Quality x Good ~ Fair Poor Pump and Flow data Pumps 112 spna Flow rate 4TH gpm Pump Capacity 4.41 gps Pump Liner & Strk sx~.2 in. Pump Pres: 3760 psf Mud Wt In 10.10 ppg,. Visc 190 secs API Tilt ml HTHP 2.0 mf Mud Wt at Max Gas 10.i ppg Mud Wt Out 10.10 ppg PV 39 cP YP 18 Ibs/100ft2 Gels 11 \ 22 \ 24 MBT p1Fi Sd 6L1a.25 Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x _TFA: 0.778 Wt On Bit: 8.00 RPM: 72 Hrs. On Bit: 2.7 Total Revs on Bit: Footage for Bit Run 569 Trip Depth: 3911 ft Trip Gas: 22 Mud Cut: ppg Trip C~: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short 'rip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 100 % CLYST % % % Connection Gas and Mud Cut ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units PP9 ft units ppg ft units ppg ft units PP9 GAS PEAKS Depth Gas in units Chro-natograph in ppm Max Background C1 C2 C3 C4 Tot C5 ~'ot 4096 to 4130 111 50 8598 0 0 0 G 4315 to 4348 139 74 9717 0 0 0 O to to to 24 hr Rec~ POH bit3. RIH bit4. Drill 39121ft to 3931ft. Leak off test. Drill ahead Logging Engineer: Steven Jenkins /Ian Johnstone "` 10000 ur'p<its = 100% Gam In Air Customer: Brooks Ran e Petroleum Re ort No : 10 rr ((~.,~]J~ a _~ FFT~~~_ y~', g . p Well: Tofkat 1 Date: 22/02/20CJ~~3 ' Sper-r-y Orelling se.-..~c~s Area: North Slope Depth 6716 udlogger's Morning Report 5'00 Lease: Exploration Footage Last 24 hrs: 2236 Rig: Nabors 27 Rig Activity: drilling Job No.: AK-AM-5672885 Report For: Jack Keene Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 225 ft/hr 219 ft/hr ( 670 ft/hr @ 5184 ) Gas* 329 unit;.. 315 unit; ( 1001 units @ 6004 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 107 spm Flow rate 43~ gpm Pump Capacity 4.4~'~ gps Pump Liner & Strk 6xt~3 in. Pump Pres.= 4090 psi Mud Wt In 10.00 ppg Visc 118 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.1 ~;opg Mud Wt Out 10.10 ppg PV 46 cP YP 23 Ibs/100ft2 Gels 17 A 28 ! 28 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: (~~_778 Wt On Bit: 5.00 RPM: 81 Hrs. On Bit: 12.97 Total Revs on Bit: Footage for Bit Run 2805 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 5855 ft Short Trip Gas: 413 Mud Cut: 10.1 ppg Short Trip CI: 31689 ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % CLYST 20 % SL1ST Connection Gas and Mud Cut 5956 ft 965 units 10.1 ppg ft units ppg ft units .ppg 6053 ft 984 units 10.1 ppg ft units ppg ft units ppg 6147 ft 975 units 10.1 ppg ft units ppg ft units .ppg 6244 ft 720 units 10.1 ppg ft units ppg ~ft units ppg GAS PEAKS Depth Gas in units Chromatog~aph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 5294 to 5311 243 211 19118 141 1~ 0 0 5573 to 5669 389 262 29955 624 171 0 0 5901 to 5936 950 417 64610 4281 26~ 347 2 5975 to 6007 1001 520 65701 5083 328 488 34 6296 to 6343 702 422 47539 4016 269x4 381 3 24 hr Rec< Drill ahead. Wiper trips at 4906ft, 5855ft. Connection ases seen after wiper trip at 5855ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone 10000 units = 100% Gas;. In Air : 11 e Petroleum Report No Customer: Brooks Ran ~ ~"~'~~ ~~`` ~ ' . g Well: Tofkat 1 Date: 23f02/2008 Sperry ®rilling Services Area: North Slope Depth 7785 . Mudlogger's Morning Report o •o Lease: Exploration Footage Last 24 hrs: 1069 Rig: Nabors 27 Rig Activity: wiper trip Job No.: AK-AM-5672885 Report For: Jadc Keener Dairy Cost $3,000 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 158 ft/hr ( 306 ft/hr @ 7584 ) Gas* na unit: 136' unit: ( 327 units @ 6717 ) ( ) Sample Quality x Good ~+. Fair Poor Pump and Flow Data Pumps 110 _ spm Flow rate a54 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in_ Pump Pres: 390 psi Mud Wt In 10.00 ppg Visc 9o secs API felt mt HTHP 2.0 ml Mud Wt at Max Gas 10:1 ppg Mud Wt Out 10.00 ppg PV 35 cP YP 23 Ibs/100ft2 Gels 13 1 22 \ 22 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TEA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 19.72 Totat Revs on Bit: p Footage for Bit 62un 3874 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7786 ft Short Trip Gas: Mud Cut: ppg Shorf Trip CI: ppm Magnet Recover Lbs to to Feet of Fiil on Bottom:. ft Current Lithology: 60 % CLYST 30 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tat C5 Tot to to to to to 24 hr Recs Drill ahead. Wiper trips at 6813ft, 7785ft. Oil shows in siltstones from @6000ft Logging Engineer: Steven Jenkins /Ian Johnstone ~ 10000 units = 100''% Gas In Air 0 Customer: Brooks Ran e Petroleum Re ort No : 12 ~JJ"``"~'~~u~E~ ~~~~~~ Well: g . p Tofkat 1 Date: 24/02/2008 Sperry ®r~nm~,9 Servioes Area: North Slope Depth 9227 udlogger's Morning Report 05.00 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: Nabors 27 Rig Activity: AK-AM-5672885 Report For: Daily Cost 1441 Drilling Ahead Jack Keener $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 120 ft/hr ( 306 ft/hr @ 7584 ) Gas* 72 unit: 151 unit: ( 151 units @ 3940 ) ( ) Sample Quality x Goad ~ Fair ;~°ocr Pump and Flow Data Pumps 105 spm Flow rate 430 gtpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pros: 4085 psi Mud Wt In 10.00 ppg Visc 9o secs 'API felt ml HTHP 2.0 rnt Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 30 cP YP 22 Ibs/100ft2 Gels 11 \ 18 \ 0 MBT pH Sd "?10 Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 30.70 Total Revs on Bit: Footage for Bit Run 53133 Trip Depth: ft Trip Gas: Short Trip Depth 7786 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppre~ Mud Cut: ppg Short Trip CI: pprma to Feet of Fill on Bottom: Current Lithology: 40 % CLYST 40 % SLTST 20 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft ft units ppg ft ft units ppg ft ft units ppg ft units ppg units ppg units ppg units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 8940 ft. Logging Engineer: Steven Jenkins / Ed Jones ~ 10000 units = 100% Gas In Aii~ t Customer: Brooks Range Petroleum Report No.: 13 - Well: Tofkat 1 Date: 25/02/2008 se,e.-.-v ®reie®.,g sew..oces Area: North Slope Depth 1.0092 Mudlogger's Morning Report 05.00 Lease: Exploration Footage Last 24 hrs: 865 Rig: Nabors 27 Rig Activity: POOH Job No,: AK-AM-5672885 Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 72 ft/hr ( 149. ft/hr @ 9858 ) Gas" na unit: 55 unit; ( 76 units @ 9486 ) ( ) Sample Quality x Good . ~ Fair Poor Pump and Flow Data Pumps 105 spm Flovr rate 430. gpm Pump Capacity 4.41 gps Pump Liner & Strk 6x12 in. Pump Pres: 4065 ... psi Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 38.20 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas:. Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units .ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 8940 ft. Stop drl , circ btm u ,be in POOH, L/D dp. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air C Customer: Brooks Range Petroleum Report No.: 14 pp t~ ~~'° '~ Well: Tofkat 1 Date: 26,02/2008 spe.-.-y ®r~ueng se.-..~ce~ Area: North Slope Depth 10092 udlogger's Morning Report 05.00 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: ,lack Keener Daily Cost X3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 ) Gas* na unit: na unit: ( 76 units @ 9486 ) ( ~) Sample Quality x Good. ~ Fair Poor ~ Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 66 secs API filt ml HTHP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 2C \ 0 MBT pH ~Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x Ti=A: 0.778 Wt On Bit:. 9.00 RPM: 81 Hrs. On Bit: 3820 Total Revs on Bit: Footage for Bif r2un 6175.5 Trip Depth: 10092 ft Trip Gas: Mud Cut: ppg Trip CI: _y ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ~~ppm Magnet Recover Lbs to ~~to Feet of Fill on Bottom: ft Current Lithology: 45 ;i CLYST 30 % SLTST ;' ~ % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg - ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< Drill ahead. Wiper trips at 6813ft, 7785ft. 8940 ft. finish POOH.. La down MWD. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100°/o Gas In Air Customer: Brooks Range Petroleum Report No.: 16 ~' ~t~~v~ ~~~~~~r~~~ Well: Tofkat 1 Date: 27102f~008 Sperry ®rilling Services Area: North Slope Depth 1001x2 udlogger's Morning Report 05~~0 Lease: Rig: Job No.: Exploration Nabors 27 -AK-AM-5672885 Footage Last 24 hrs: _ 0 i~ig Activity: BOP test Report For: Jack Keener gaily Cost $3,075 Current 24 hr Avg 24 hr Max. R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas'' na unit; na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flaw rate na gpm Pump Capacity na gps Pump Liner 8r Strk na in. Pump Presa na psi Mud Wt In 10.00 ppg Visc 66 secs API felt ml HTHP 1.5 ml Mud Wt at Max Gas 1D.1 ppg Mud Wt Out 10.00 ppg' PV 27 cP YP 16 Ibs/100ft2 Gels 12 \ 20 \ 0 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: X31/2 Jets: 6 x 13 x x TFA: 0.778 :38.20 Total Revs on Bit: Footage f©r Bit Rur~ 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 45 % CLYST 30 % SLTST 25 % SST % °I% Connection Gas and Mud Cut ft' units ppg ft units ppg ft units ppg ft units ppg ft units .:ft units ft units ft units ppg ft units ppg ppg ft units ppg: ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 (:4 Tot C5 Tot to to to 24 hr Rec~ Drill ahead. Wiper tri sat 6813ft, 7785ft. 8940 ft. Test BOP's Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air - Customer: Brooks Range Petroleum Report Nc~.: 16 - ~'~`°~=.i~ ~ _ ~ }' Well: To#kat 1 Date: 28/02/2008 ` Sperry ®rilleng Services Area: North Slope Depth 10082 udlogger's Morning Report o •00 Lease: Rig: = Job No.: Exploration Nabors 27 AID AM-5672885 Footage Last 24 hrs: 0 Rig Activity: Wash anc~ Ream Report For: Jack Keener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( 149 ft/hr @ 9858 Gas'' na unit: na unit: ( 76 units @ 9486 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flova Data Pumps na spm Flaw rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 76 secs API felt ml HTt-iP 1.5 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Out 10.00 ppg PV 20 cP YP 17 1bsa+100ft2 Gels 6 \ 16 \ 20 MBT pH Sd Bit No.: 4 Type: PDC Bit Size:. Wt On Bit: 9.00 RPM: 81 Hrs. On Bit: 8 1d2 Jets: 6 x 13 x x TFA: 0.778 38.2'0 Total Revs on Bit: Footage for Bit Run 6175.5 Trip Depth: 10092 ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet oaf Fill on B®ttom: ft Current Lithology: 45 % CLYST 30 % ~LTST 25 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C11 C2 C3 C4 Tot C5 Tot 24 hr Recs Drill ahead. Wi er trips at 6813ft, 7785ft. 840 ft. TIH to bottom, wash and ream... Logging Engineer: Steven Jenkins / Ed Jones 't 0000 units = 100% Gas In Air Customer: Report No.: 17 .Brooks Range Petroleum Well: . Tofkat 1 Date: 29/02/2008 Sperry ®relling see-.aces Area: North Slope Depth 10D92 udlogger's Morning Report 05~~0 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 798 Nabors 27 Rig Activity: Wash a~dl Ream A~-AM-5672885 Report For: Jack i1e~ener Daily Cost $3,0}75 Current 24 hr Avg 24 hr Max R.O.P. 139 ft/hr 80 ft/hr ( 246 ft/hr @ 10668 ~ Gas" 129 unit; 245 unit: ( 2400 units @ 10092 ~ ( ~ Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flow rate 534 gpm Pump Capacity X4.41 gps Pump Liner & Strk ~ x 12 in. Pump Pres: 3414 psi Mud Wt In 10.35 ppg Mud Wt Out 10.35 ppg Visc 80 secs API felt ml HTHP 3.1 ml Mud Wt at Max Gas 1~U_1 ppg PV 27 cP YP 18 Ibs/100ft2 Gels 3 \ 4 \ 9 MBT pH Shc Bit No.: 4 Type: Wt On Bit: 9A0 RPM: PDC Bit Size: 81 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA,: 0.778 45.30 Total Revs on Bit: Footage for Bit Rur~ 6973 Trip bepth: 10092 Short Trip Depth Magnet Recover Lbs ft Trip Gas: ft Short Trip Gas: to Mud Cut: ppg Trip CI: ppm Mud Cut: ppg Short Trip CI: ppm to Feet o~ Fill on Bottom: ft .Current Lithology: 50 % CLYST 30 °,/~ SLTST 20 % ~ SST °io a/a Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft .units ppg ft units ppg ft units ppg Depth to to Gas in units Max Background GAS PEAKS Chromatograph in ppm G1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Drillin Ahead Logging Engineer: Steven Jenkins / Ed Jones 't 0000 units = 100% Gaas In Air i Customer: Brooks Ran e Petroleum Re ort No : 18 h ~~~~~~ ~~~'°_n _ g p . Well: Tofkat 1 Date: 03/01fZG08 sPe.-ry ®r-lining ServGces Area: North Slope Depth 1207Q udlogger's Morning Report 5.0 Lease: Exploration Footage Last 24 hrs: 978 Rig: Nabors 27 Rig Activity: Drili Ahead Job No.: AK-AM-5672885 Report For: Mr Larry Dairy Cost $3,07 Current 24 hr Avg 24 hr Max R.O.P. 204 ft/hr 45 ft/hr ( 334 ft/hr @ 12000 ) Gas* 25 unit: 45 unit: ( 186 units @ 11938 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/70 spm Flow rate Ss4 gpm Pump Capacity 4:.41 gps Pump Liner & Strk 6 ~ t z in. Pump Pres: 3414 psi Mud Wt In 10.40 ppg Visc 94 secs API felt ml HTHP 3.5 ml Mud 9Nt at Max Gas 10.`~ ppg Mud Wt Out 10.40 ppg PV 36 cP YP 16 tbs/100ft2 Gels 5 \ 11 \ 17 MBT pH Sd `' Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 'l3 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: ~i2.30 Total Revs on t3it: Footage for Bit Run 7951 Trip Depth: ft Trip Gas: Mud Cut. ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut:. ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill em Bottom: ft Current Lithology: 40 % SH 40 % SLTST 20 m/o SST Connection Gas and Mud Cut ft units ppg iK units pfag ft units ppg ft units ppg tt units ppg ft units ppg ft units ppg fR units ppg ft units ppg ft units ppg ~ units ppg ft units ppg GAS PEAKS Depth Gas in units Chronlatog~aph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 11938 to 11940 186 40 8 1 1 1 to to to to 24 hr Rec~ Drillin Ahead,Work on Pumps, Dril Ahead Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gays In Air e Petroleum Report No : 19 Customer: Brooks Ran ~ ~~~i~~[~~~~~3~~~~ ~ g . Well: Tofkat 1 Date: 02/03/2008 Sperry ®rilling Ser~rices Area: North Slope ®epth 12795 Mudlogger's Morning Report o •~ Lease: Exploration Footage Last 24 hrs: 725 Rig: Nabors 27 Rig Activity: Drilk Ahead Job No.: AK-AM-5672885 Report For: M.r Larry Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 30 ft/hr ( 289 ft/hr @ ,. 12115 ) Gas* 7 unit; 18 unit: ( 25 units @ ~ 12504 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 74 spm Flow rate 311 gpm Pump Capacity 4.41 gps Pump Liner & Strk 6 x 12 in. Pump Pres: 2131 .psi Mud Wt In 10.60 ppg Visc 147 secs AP- filt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out 10.60 ppg PV 56 cP YP 26 Ibsl100ft2 Gels 19 \ 34 \ 42 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1d2 :Jets: 6 x 13 x _x TFA: O.s'~8 Wt On Bit: 9.00 =RPM: 70 Hrs. On Bit: 84.30 Total Revs on Bit: Footage for Bit Run 8676 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL _ ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current L~!hology: 80 % SH 10 % SLTST 10~ % LS % % .~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units pig ft units ppg ft units ppg ft units ppg GiAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C'6 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drillin ahead, work on um s, Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In a4ir ~~ --- Customer: Brooks Range Petroleum Report Nc~.: 2D ~' ~~~~ ~~` ~ 1 Well: Tofkat 1 Date: 04/03f20;08 spec-ry ®re":ng se~..~ce~ Area: North Slope Depth 13'173 Mudlogger's Morning Report o goo Lease: Rig: Job No.: Exploration Footage Last 24 hrs: C Nabors 27 Rig Activit`~: TD-P®QH AK-AM-5672885 Report Fcxr: Mr Lam Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/tir 0 ft/hr ( 0 ft/hr @ 0 Gas* na unit; 0 unit; ( 0 units @ 0 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Floor Data Pumps na spm Flow rate raa gpr~ Pump Capacity na gps Pump Liner & Strk - rya in. Pump Pres: na psi Mud Wt In 10.70 .ppg Visc 124 secs API filt ml HTHP 3.J ml Mud Wt aift Max Gas 1t).G ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 424 \ 33 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1J2 ..~ Jets: 6 x 13 x x TFA: 0.778 102.30 ,Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip ~I: ppm Mud Cut: ppg Shoft Trip CI: ppm to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST % °,~~ Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft .units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS ' ChromatograpJh in ppm C1 C2 C3 C4 Tot C~ Tot to to to 24 hr Rec~ Finish POOH, ri up for runnin a-lo s.... Logging Engineer: Steven Jenkins / Ed Jones 10000 aunits = 100% Gas In Air Customer: : 2't Brooks Range Petroleum Report No _ '~ -~'-- J ~ _ ~ Well: Tofkat 1 . Date: 04/03/2008 Sperry ®riiiing s~rvicas Area: North Sloe Depth 13173 udlogger's Morning Report 05' 0 Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 2T Rig Activity: TD-POOH AK-AM-.5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ftlhr ( 0 ft/hr @ 0 Gas'` na unit: 0 unit: ( 0 units @ 0 ( Sample Quality x -Good ~ Fair Poor ) ) ) Pump and Flaw Data Pumps na spm Flow e--ate na gg~m Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gaas 101.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/100ft2 Gels 11 \ 24 \ 33 MBT pH Sd Bit No.: 4 Type; PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 102.30 T®tal Revs on Bit: Footage for Eiit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: pprn Mud Cut: ppg Short Trip Ck~ ppnre to Feet of Fill on Bottom: flt Current Lithology: 80 % SH 10 % SLTST 10 % SST %, °!® Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft urnits ppg .ppg tt units ppg ppg tt uunits ppg ppg ~ft omits ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot G5 Tot to to to 24 hr Rec~ Finish POOH, ri up for runnin a-lo s..., Logging Engineer: Steven Jenkins / Ed Jones 10000 units = °I00% Gas In Air Customer: Broaks Ran e Petroleum Re a 22 ort No ~~~~ °~ w ~~~~~ g p ~ Well: Tofkat `I Dates 05/03/2008 Sperry ®rilling ser-.aces Area: North Slope Depths 13173 Mudlogger's Morning Report 05'00 Lease: Expt©ration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity TD-POOH Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Marc R.O.P. na ftlhr 0 ft/hr ( 0 ft,'hr @ 0 ) Gas* na unit: 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow data Purnps na spm Flow rate na gprn Pump Capacity na gps Purr~p Liner & Strk na in. Purnp Pres: na psi Mud Wt In 10.70 ppg Visc 124 secs API felt ml HTHP 3t.0 rni Mud Wt at N1ax Gas 10.6 ppg Mud Wt Out na ppg PV 56 cP YP 23 Ibs/10)Oft2 Gels 11 \ 24 \ 33 MBT p[t--i Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: O.r'78 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: ~ Footagfe for Bit Run X054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip C!~ ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short drip CI: Ppm Magnet Recover Lbs to to Feet of Fill on Botfa~m: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST % Connection Gas and Mud Cut ft units ppg ft units ppg. ft units -ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg. ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 mot to to to to to 24 hr Rec~ Did BOP test, and be in runnin a-lo son dp. Logging Engineer: Steven Jenkins / Ed Jones 10000 urAits = 100% Gas I'n Air Customer: Brooks Range Petroleum Report No : 23 `~"~f'€`""'' ~~ . Well: Tofkat 1 Date: 06/03/2005 Sperry ®rilling se.-vanes Area: North Sloe Depth 13173 Mudlogger's Morning Report n. goo Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig :Activity: E-Logging Job No.: AK-AM-5672885 Repaort for: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ff~#~r @ 0 ) Gas'` na unit: 0 unit: ( 0 wits @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi ~ Mud Wt In 10.70 ppg Visc 13o secs API Tilt ml HTHP 3.0 ml Muid Wt at Maas Gas 10.6 ppg p Mud Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT_pH Sd % f ~~ Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: Qi..778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: ''002.30 Total Revs on Bit: Footage for Bit Run 9054 - - y Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut:. ppg Short Trip CI: ppm Magnet. Recover Lbs to to Feet of Fitl on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST t Connection Gas and Mud Cut I ft units ppg ft units ppg ft units ppg I ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft _` units ppg ~ ft units ppg ft units ppg ft units ppg I - GAS PEAKS f Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to 24 hr Rec~ POOH from a to in on drill i e.... Logging Engineer: Steven Jenkins / Ed Jones 1000 units = 100% Gas In Air I+ u' 1 : 2~ Customer: Brooks Range Petroleum Report No F ~, ~ __ ____ ~ ~~~~:,a~~~~-=` . Well: Tofkat 1 Date: 07/03"2008 Sperry ®ri117ng ServGc~s Area: North Slope Depth 13173 Mudlogger's Morning Report os•no Lease: Exploration Footage Last 24 hrs: to Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Lafry Daily Cost $2,375 Current 24 hr Avg r 24 hr Max R.O.P, na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* na unit: 0 unit: ( 0 units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 130 secs API felt ml HTNP 3.0 ml Mud Wt at Max Gas 1t~.6 ppg Mud4Wt Out na ppg PV 56 cP YP 26 Ibs/100ft2 Gels 11 \ 25 \ 37 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On ;Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bid Rur- 9054 Trip Depth: ft Trip Gas: Mind Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST % °~ Connection Gas and Mud Cut ft units ppg ft unit's ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg _ ft units ppg ft units ppg ft units ppg ft units ppg ft uns~ts ppg GAS PEA@(S Depth Gas in units Chramatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ POOH from a to in on drill pipe.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 1C~0% was In Air C 1 Customer: 13r©oks Range Petroleum Report Flo.: 25 _ -' ~ ~ = ~ ~ - - - Well: Tofkat 1 f][ate: 08/03/008 spec-ry ®reia:.,~ see-v®o~s Area: tJorth Slope Depth 13't73 udlogger's Morning Report o goo Lease: Exploration Footage Last 24 Iftrs: 0 Rig: Tabors 27 Rig Acti~rity: E-Looming Job No.: e~K-AM-5672885 Report for: Mr Lary Daily Cosa $2,35 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/tar @ 0 } Gases na unit: 0 unit: ( 0 units @ 0 } ( } Sample Quality x Good ~ Farr Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.70 ppg Visc 1s0 secs API ~iit ml HTHP 3.0 ml Mud. NWIt at Max Gas '{EA_6 ppg Mud Wt Out na ppg PV 62 cP YP 20 tbs/100ft2 Gels 11 \ 25 \ 35 MBT pH Sdx Bit No.: 4 Type: PDC Bit Size: S 1/2 Jets: 6 x 13 x ~x TFA: 0.778 VVt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Rurr 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg short Trip CI: ppm Ma net Recover Lbs to to Feet of Fill o~n Bottom: ft 9 Crerrent Lithology: 80 % SH 10 % SLTST 10 % SST `"/o `~'/° Connection Gas and Mud Cut fit units ppg ft units ppg ft units ppg ft units ppg ft units ppg fit units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Ghromatog~aph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to 24 hr Rec~ E-Lo in on drill ipe.. Logging Engineer: Steven Jenkins / Ed Jones 1000 units = 100°!o~-Gas In Air. Customer: Report No.: 26_ Brooks Range Petroleum Date: 09/03/20013 rw- ~~~ 3~~~~- ~ ---__ Well: Tofkat 1 Depth 13173 sPerry ®r;,a;~~ Ser-`races Area: North Slope Footage Last 24 hrs: 0 tion l Lease: ora Exp Rig Activity: E-L~- m Rig: Nabors 27 Report For: Mr Larry Job No.: AK-AM-5672885 Daily Cost $2,375 Mudlogger's Morning Report 05'00 Pump and Flow Data Current 24 hr Avg 24 hr Max 0 ~ Pumps ~_. spm Flow rate na ~Pm n_ft/hr 0 ft/hr ( 0_ O.P. R ft/hr s @ 0 ) Pump Capacity na 9p in its @ _ . p < Gas* ~_ unit: 0 _ unit. ( . _~_ un n~ ) Pump Liner & Strk ( ~- Pump Pres:_ n=_ Psi Sample Quality x .Good ~ Fair Poor l HThtP 3.0 ml Mud 1®1lt at Max Gas 'td•S' PPS m % Mud Wt In 10.80 ppg Visc 155 secs API filt 10 ~ 23 ~ 33 MBT pH ~ _ .- 27 Ibs/100ft2 Gels PV 53 cP YP Mud Wt Out na -ppg . _ x TF,A: 0.? ~ 8 4 Type: PDC Bit Size : Bit No x : 8 1/2 Jets: 6 x 13 t=©otage for Bit Rean 9154 Total Revs on Bit: . Wt On Bit: ~_ RPM: 70-Hrs. On Bit: ____ 102.30 Muci Cut: ppg Trip CI: p?pm Trip Depth: ft Trip Gas: Short Trip CI: ppm Mud Cut: ppg ft ft Short-Trip Gas: Short Trip Depth _ ~_ tp Feet of Fill on Bottom: Magnet Recover - Lbs - to % SH 10 ° SST °J° °/a % SLTST 10 /° 80 Current Lithology: Connection Gas and Mud Cut ft units pP9 units ppg units ppg _ft tt ft units ppg ft units pP9 ft units .ppg ft units pP9 nits ppg - - ft units ppg ft units PP9 - ft u _ - units Pp9 ft units ppg -_- GAS PEAKS Chromatograph in ppm Gas in units Depth C2 C3 C4 Tot C5 Tot C1 Max Backgroun d ---~-- - to - ---- - - to __ -- ~~ - to _,_ ____-- ~~ - - to _____ - - - to 4 hr Rec~ E-Logging ~'~"' "'"p Currently POOH w/core guns.. ~ ,,,,,.~"n Fnaineer: Steven Jenkins / Ed Jones 1©000 units = 'i00°~~ Gars In A ~~~~- Customer: Brooks Range Petroleum Report No~~ 27 ___ ~~~9 _^'ryy ~`~~~~~~ {try t~~ ~ _~ {.rte ^3 u~ ~~ ~ 3 ~'3 Well: Toft~at 1 Dato:; 10/03/20108 sPe.-rv ®r®avor,g se.-..aces Area: North Slope Deptllr 13173 udlogger's Morning Report .0 Lease: Rig: Job No.: Exploration Footage Last 24 hrse 0 Nabors 27 Rig Activity E-Loggie~ag AK-AM-5672885 Report For4 Mr Larr},+ Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 Gas" na unit: 0 unit: ( 0 units ~ 0 ( Sample Quality x Good ~ Fair.- Poor ) ) ) Pump and Flow data Pumps na spr~a Flow rate rta gpm Pump Capacity nat gps Pump Liner & Strk rs~ in. Pump Pres: na psii Mud Wt In 10.70 ppg Visc 146 secs API felt ml HTHP 3.0 ml Mud Wt at 'max Gas 10.6 :ppg Mud Wt Out na ppg PV 57 cP ., YP 22 Ibs/1100~ft2 Gels 11 ~ 22 \ 30 MBT pZ#~ Sd Bit No.: 4 Type: PDC Bit Size: Wt On Bit: 9.00 RPM: 70 Hrs: On Bit: 8 1/~ Jets: 6 x 13 x _x TFA: X3.778 102.3x0 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Short Trip Depth ft Short Trip Gas: Magnet Recover Lbs to . Mud Cut: ppg Trip GI: ppm Mud Cut: ppg Shor& Trip CL ppm to Feet of Fill on Bot:t~m: ft Current Lithology: 80 % SH 10 % SLTST 10 °!° SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft ~ units ppg ppg ft ~ units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to CAS PEAKS Chromatog~aph in ppm C1 C2 C3 C4 Tot C5, Tot 24 hr Rec~ E-Lo in on drill pipe.. Logging Engineer: Steven Jenkins / Ed Jones 10000 snits = 100% Gae; In Air Cust r: B k R P t l R N 28 ~~~ '~ ` ~ ~ ~~ ome roo s ange e ro eum eport o.: Well: Tofkat 1 Date: 11 /03/2008 Sperry Grilling s@.-v;ces Area: North Slope Depth 13173 udiogger's Morn~g Report •o Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: E-Logging Job No.: AK-AM-5672885 Report For: Mr Larry Daily Cost $2,375 ` Current 24 hr Avg 24 hr Max R:O.P. na ft/hu 0 ft/hr ( 0 ft/hr @ 0 ) Gas" na unit: 0 unit: ( 0 units @ 0 ) ( ) Samples Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres; na psi Mud ~!1/t In 10.70 ppg Visc 147 secs API filt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud ~61/t Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd i3it No.: 4 Type_ PDC Bit Size: 8 1/2 Jets: 6 x 13 x _x TFA: 0.778 UNt On wit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: SO % SH 10 % SLTST 10 % SST ~' + Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg F~; ~ ' , E GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to ' i to to to 24 hr Rec~ ContirAUed E-Logging._. ` Logging Engineer. Steven Jenkins / Ed ,!ones 10000 units = 100% Gas In Air Customer: Brooks I>~an e Petroleum Re : 29 ort No _ ~~ ~ g p . Well: Tofkat T Date: 12/03/2008 Sp®rry ~rilli~g Services Area: North Slope Depth 13173 Mudlogger's Morning Report Lease: Exploratigon Footage Last 24 hrs: 0 Rig: Nabors ~7 Rig Activity: E-Logging Job iVo.: AK-AM 5672885 Report For: Mr Larry Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 fU®hr ( 0 ft/hr @ 0 ) Gas" na unit: 0 unit: ( t) units @ 0 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na .psi ,: Mud Wt In 10.0 ppg Visc 'B47 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.6 ppg Mud Wt Out na ppg PV 58 cP YP 21 Ibs/100ft2 Gels 11 \ 22 \ 31 MBT pH Sd % ; Bit No.: 4 ~'ype: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: .ppg Trip CI: ppm Short Trip Depth ft Sh®rt Trip Gas: Mud Cut: ppg Short Trip CL ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SI-t 10 % SLTST 10 % SST Connection Gas and Mud Cut ft wits ppg ft units ppg ft units ppg ft omits ppg ft units ppg ft units ppg ft wits ppg ft units ppg ft units ppg ft eanits ppg ft units ppg ft units ppg ,_ GAS P't=AKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Continued E-Lo ~n on drill i e... Loggirtg Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i u Customer: Brooks Ran e Petroleum Re ort No : 30 g . p ~~ Well: Toficat 1 Date: 13/03/2008 Sperry Oritl'sng Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH ' Job No.: AK-CAM-5672885 Report For: Mr Larry Mudlogger s Morning Report Daily Cost $2,375 Current 24 hr Avg 24 hr IMax Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr ~ 0 ) Pumps 65 spm Flow rate 274 gpm Gas" 23 unit: 0 unit: ( 209 units ~ 3752 ) Pump Capacity 401 gps Sample Quality x Good ~ ( .Fair Poor ) Pump Liner & Strk Pump Pres; 1335 na in. psi Mud Wt In 10.70 ppg Visc 270 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg PV 76 cP YP 26 Ibs/1OOft2 Gels 15 \ 37 \ 39 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM: 70 Hrs . On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 -rip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppn short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppn Aagnet Recover Lbs to to Feet of Fill on Bottom: f Current Lithology: 80 % SH 10 % SILTST 10 % SST Connectian Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Sta a in the hole for cement ~ob... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i~ Customer: Brooks Ran : 31 e Petroleum Re ort No ~~~~~ ~'~ g p . Well: To~kat 1 Date: 14/03/2008 Sperry drilling Serviices Area: North Sloe Depth 13173 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: POOH, Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 fF~r Avg 24 itr Max R.O.P. na ft/hr ® ft/hr ( 0 Whr @ 0 ) Gas* 2 unit: ® unit: ( 8414 units @ 10200 ) Sample Qualitzy x Good ® Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres: 1335 psi ; Mud Wt In 10.80 ppg V~sc 221 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.7 ppg Mud Wt Out 10.70 ppg P~/ 66 cP YP 34 Ibs/'100ft2 Gels 14 \ 34 \ 35 MBT pH Sd Bit No.: ~3 Type: PDC Bit Size: 8 1!2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: JAO RPM: 70 Hrs. On Bit: 102.0 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recomrei Lbs to to Feet of Fill on Bottom: ft Current Lithai~gy: 80 % SH 10 % St_TST 10 % SST Conr®ection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec< Sta a in hole, Circulate bottonns u ,max as 8414 units. Pum 2 cmt plu s, circ btm up ,POOH.. Logging Engirxeer: Steven Jenkins / Ed Jones '` 10000 units = 100% Gas In Air u : 32 Customer: e Petroleum Re ort No Brooks Ran ~ I~,®~ . g p . 1Nell: Tofkat 1 Date: 15/03/2008 Spewry Grilling Services Area: North Slope Depth 13173 Muc~iogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Rig UP for Cmt Job Plo.: AK-AM-5672885 Report For: Mr Jack Daily Cost .$2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( U ft/hr @ 0 ) Gas* 2 unit: 0 unit: ( 4'17 units @ 9920 ) ( ) Samples Quality x Good ~ Fair Poor Pump and Flow Data Pumps 65 spm Flow rate 274 gpm Pump Capacity 401 gps Pump Liner & Strk na in. Pump Pres; 1335 psi , Mud \d~/t In 10.80 ppg Visc 275 secs API felt rnl HTHP 3.0 ml Mud Wt at Max Gas 10.8 ppg Mud tlMlt Out 0.00 ppg PV 66 cP YP 34 Ibs/100ft2 Gels 15 \ 36 \ 36 MBT pH Sd - Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Brit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short -i'rip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Curre~dt Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ TIH, to cmt. 9950 ft. circulate hole, Max as 417 units.POOH, R/U BHA w/ cmt stin er & TIH.. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Cust®mer: Brooks Range Petroleum Report No.: 33 ~IVell: Tofkat 1 Date: 16/03/2008 Sherry drilling se.-vices ~4rea: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Rig UP for Cmt Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $2,375 Current 24 hr Avg 24 hr Max Pump and Flow Data R.~~P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 57 spm Flow rate 161 gpm Ga$~` 45 unit: 0 unit: ( 62 units @ 6540 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres: 601 psi M'~ud Wt In 10.8® ppg Visc 265 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mtud Wt Out 10.90 ppg PV 64 cP YP 32 Ibs/100ft2 Gels 16 \ 35 \ 36 MBT pH Sd Bit IWo.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt ®n Bit: 9.00 RPM:. 70 Hrs. Ora Bit: 102.30 Total Revs on Bit:. Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Sort Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm I~,agnet Recover Lbs to to Feet of Fill on Bottom: ft Cdurrent Lithology: 80 % SH 'C0 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units L ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hzr Rec~ Sit 3rd cmt lu , P'~OH to set 4th lu , circ btm u ,set lu .POOH. Loga~ing Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i~ Cur tourer: Brooks Ran : 34 e petroleum Re ort No ~~ ~°~ ~ g p . Well: Tofkat 1 Date: 17/03/2008 Sperry Drilling S®rvicas Area: North Slope Depth 13173 lludlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT .Dob No.: AK-ARlI-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O._P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas;` 2 unit: 0 unit; ( 20 units @ 5055 ) ( ) San+~ple Quality x Good ~ Fair Poor Pump and Flow Data Pumps 40 spur Flow rate 140 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 588 psi ; fvtud Wt In 10.90 ppg Visc 260 sacs API Tilt ml FiTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Maud Wt Out 10.90 ppg PV 67 cP YP 26 Ibs/100-ft2 Gels 18 \ 35 \ 36 MBT pH Sd Bit ~o.: 4 Type: PDC Bit Size: 8 1/2 .Jets: 6 x 13 x x TFA: 0.778 Wt EDn Bit: 9.00 RPM: 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trap Depth: ft Trip Gas. L~Jlud Cut: ppg Trip CI: ppm Sort Trip Depth ft Short Trip Gas: wllud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft ~ units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hrr Rec~ TFiFi, circ btm up, cement, ull into cs ,service ri .. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 35 Customer: Brooks Ran e Petroleum Re ort No ~ p . g Well: Tofkat 1 Date: 18/03/2008 Spey-ry ~rlting S@rvicas Area: North Slope Depth 13173 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $2,375 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr E 0 ft/hr @ 0 ) ~Gas* na unit: 0 unit: ~ 25 units @ 6120 ) " Q ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 49 spm Flow rate 204 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 488 psi „ .f , Mud Wt In 'GC.80 ppg Visc 200 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.9 ppg Mud Wt Out '0.80 ppg PV 58 cP YP 16 Ibs/100ft2 Gels 13 \ 24 \ 25 MBT pH Sd '~' i 'Sit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.0® RPM: 70 Hrs;. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gam: Mud Cut: ppg Trip CI: ppm Short Trip Depttu ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Litholo 80 % SH 10 % SLTST 10 % SST 9~= Connect~~n Gas and Mud Cut + ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Bactcground C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Service ri , sli & cut drill line, I/d cmt bra, /u olish ass , TIH, wash and ream, circ btm u ,POOH.. togging Engineer_ Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air 0 Customer: : e Petroleum Report No Brooks Ran 36 m Well: g Tofkat 1 . Date: 19/03/2008 Sperry drilling Services Area: North Slope Depth 13173 Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: CMT Job No.: AK-AM-5672885 Report For: Mr Jack Mudlogger's Morning Report Daily Cost $3,075 Current 24 hr Avg 24 hr Max Pump and Flow Data R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Pumps 38 spm Flow rate 188 gpm Gas* na unit: 0 unit: ( 15 units @ 6120 ) Pump Capacity 4.01 gps ( ) Pump Liner & Strk na in. Sample Quality x Good ~ Fair Poor Pump Pres; 380 psi Mud Wt In 10.10 ppg Visc 15a secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.1 ppg Mud Wt Oui 10.10 ppg PV 50 cP YP 20 Ibs/100ft2 Gels 11 \ 23 \ 24 MBT pH Sd Bit No.: 4 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 9.00 RPM:. 70 Hrs. On Bit: 102.30 Total Revs on Bit: Footage for Bit Run 9054 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm Magnet Rerovei Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 10 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft ~ units ppg ft _m units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to tG to to to 24 hr Rec~ Circulate and r/u for cmt. S of isolation lu ooh, s of shoe lu ooh, circ and clean finish POOH... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air i~ Customer: Brooks Ran e Petroleum Re : 37 ort No Ifs ~ ~, g p . WeIL Tofkat 1A Date: 20/03/2008 Sperry. grilling se~..~~es Area: North Slope Depth 3897 udlogger's Morning Report 5• Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-5672885 Report For: Mr Jack Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.J.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gaas* na unit: 0 unit: ( 15 units @ 6120 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: o psi ' ~Aud Wt to 9.90 ppg Visc 156 secs API felt m1 HTHP 3.0 ml Mud Wt at Max Gas ppg ~flud Wt Out ppg PV 49 cP YP 23 Ibs/100ft2 Gels 11 \ 22 \ 25 MBT pH Sd Bid No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wfr On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Tripe Depth ft Short Trip Gas: Mud Cut: ppg Short Trip CL ppm lf\Aagnet Recover Lbs to to Feet of Fill on Bottom: ft current Li~hology: % SH % SLTST % SST Connection Gas and Mud Cut ift units ppg ft units ppg ft units ppg ~9ft units ppg ft units ppg ft units ppg ift units ppg ft units ppg ft units ppg ~ units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Test BOP's, m/u BHA, load nuke sorces, TIH ... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 38 ort No Customer: Brooks Ran e Petroleum Re ~~ g p . Wel I: Tofkat 1 A Date: 21 /03/2008 Sperry prilli~g se~..~~es Area: North Slope Depth 3897 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Cmt Job No.: AK-AM-5672885 Report For: MrJackKeener Daily Cost $3,075 '` '' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 0 ft/hr ( 0 ft/hr @ 0 ) Gas* na unit: 0 unit: ( 15 units @ 6120 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 0 psi - ;; Mud Wt In 10.00 ppg Visc 152 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas ppg Mud Wt Out ppg PV 49 cP YP 22 Ibs/100ft2 Gels 10 \ 19 \ 25 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.77$ Wt On Bit: RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Mud Cut: ppg:; Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mud Cut: ppg'; Short Trip CI: ppm Magnet Recovea Lbs o to Feet of Fill on Bottom: ft Current Lithology: % SH % SLTST % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to T to to to 24 hr Rec, TIH to to cmt; none found, circulate and POOH, la down MWD, m/u bha w/cmt stin er and TIH.. Circ& Clean cement, and pull up hole, circ & clean hole, POOH... Logging Engineer: Steven Jenkins / Ed Jones ,10000 units = 100% Gas In.Air : 39 Customer: Brooks Ran e Petroleum Report No ~~ ~ ~~ ~ . g Well: Tofkat 1A Date: 22/03/2008 Sperry. grilling Services Area: North Slope Depth 4732 udlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 762 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-567285 Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 105. ft/hr ( 414 ft/hr @ 4245 ) Gas" 4 unit: 75 unit: ( 104 units @ 45150 ) ( ) Sample Quality x Good ~ Fair Q Poor Pump and Flow Data Pumps 0 spm Flow rate 0 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 0 psi Mud Wt In 9.90 ppg Visc 179 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Gut 9.90 ppg PV 60 cP YP 27 Ibs/100ft2 Gels 17 \ 38 \ 0 MBT pH Sd ' Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 2.00 RPM: 70 Hrs. On Bit: 9.10 Totat Revs on Bit: Footage for Bit Run 762 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Trip Depth 4732 ft Short Trip Gas: Mud Cut: ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lr~hology: 60 % CIySt 30 % SLTST '6D % SD C®nnection Gas and Mud Cut units ppg ft units ppg ft units ppg fit units ppg ft units ppg ft units ppg units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Dep~#h Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ TIH, be in kick off, drillin ahead... short trip„ Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 40 Brooks Ran e Petroleum Re ort No `®e Well: g Tofkat 1A p . Date: 23/03/2008 Speesry Grilling Services Area: North Slope Depth 6066 Mud3logger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1334 Rig Activity: Short Trip Report For: MrJackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 125 fUhr 55.5 ft/hr ( 425 ft/hr @ 5855 Gas" 245 unit: 110 unit; ( 834 units @ 5873 ( Sample- ~,2uality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps 64/64 spm Flow rate 542 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 2974 psi Mud ~~t In 10.10 ppg Visc 119 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud ~.~t Out 10.10 ppg PV 49 cP YP 23 Ibs/100ft2 Gels 13 \ 26 \ 0 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: Wt On B•~#: 2.00 RPM: 70 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 15.50 Total Revs on Bit: Footage for Bit Run 1334 Trip Dip#h: ft Trip Gas: Short drip Depth 4732 ft Short Trip Gas: Magnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 429 Mud Cut: na ppg Short Trip CI: ppm to Feet of Fill on Bottom: ft C~.irrerat Lithology: 40 % CIySt 40 °1o SLTST 20 % SD Connection Gas and Mud Cut 5873 ft 834 units 9.9 ppg 5683 ft 429. units 9.9 ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg ®epth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Reac< Drillin Ahead, short trips as needed, um re air, drillin ahead... Logging: f=ngineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air L' i : 41 ort No Customer: Brooks Ran e Petroleum Re ~n~l f g p . Well: Tofkat 1 A Date: 24/03/2008 sP@.-~-y ~rilli~g ser.rioes Area: North Slope Depth 7778 uct~ogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1712 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 '` +Current 24 hr Avg 24 hr Max R.O.P. 82 ft/hr 71.3 ft/hr ( 339 ft/hr @ 7113 ) Gas'` 47 unit: 68 unit: ( 144 units @ 6599 ) ( ) Sample duality x Good ~ Fair Poor Pump and Flow Data Pumps 64/64 spm Flow rate 535 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3185 psi Mud W7t In 10.00 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Mud 1IUJt Out 10.00 ppg PV 51 cP YP 27 Ibs/100ft2 Gels 13 \ 25 \ 0 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bitt_ 2.00 RPM: 50 Hrs. On Bit: 26.50 Total Revs on Bit: Footage for Bit Run 3046 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short drip Depth 7778 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnett Recover Lbs to to Feet of Fill on Bottom: ft Currerni Lithology: 50 % CIySt 40 % SLTST 10 % SD Connection Gas and Mud Cut ft units ppg ft -units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units .ppg GAS PEAKS f~epth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rem Drilling Ahead, short trip as directed, drilling ahead..... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = t00% Gas In Air : 42 e Petroleum Report No Custorreer: Brooks Ran ~`"'~ ~~ . g Wkell: Tofkat 1A Date: 25/03/2008 speBrry i~rilling Services Araea: North Slope Depth 9582 Ititudlogger's Morning Report Leaese: Exploration Footage Last 24 hrs: 1804 Frig: Nabors 27 Rig Activity: Drilling Ahead Job [~o.: AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 `' Current 24 hr Avg 24 hr Max R.O.P'_ 279 ft6hr 75.2 ft/hr ( 3515 ft/hr @ 8626 ) Gas' 72 omit: fib unit: ( 1G5 units @ 9358 ) ( ) Sarn~le Quality x Good ~ Fair i'oor Pump and Flow Data Pumps 64/64 spm Flow rate 521 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 3218 psi . ' Mua~ Wt In 9.90 ppg Visc 86 secs API felt ml HTHP 2.0 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 32 cP YP 17 Ibs/100ft2 Gels 11 \ 25 \ 0 MBT_pH Sd Bit Noa_: 1 Type: PDC Bit S-rze: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt O~ Bit: 10.00 RPM: 50 Hrs. On Bait: 37.10 Total Revs on Bit: Footage for Bit Run 4850 Tripp Depth: ft Trip Gas: Mud Cut: ppg Trip: CI: ppm Short Trip. Depth &821 ft Short Trip Gas: 123 Mud Cut: na ppg Short Trip CI: 43K ppm Ma¢,~net Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gals and Mud Cut ft unifs ppg ft units. ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg :: ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Dri~in Ahead, short tri 20 Strids, drillin ahead..... Loggiing Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Brooks Ran : 43 e Petroleum Re ort No ~~ ~, ~ Well: g Tofkat 1A p . Date: 26/03/2008 S~aerry Grilling Services Area: North Slope Depth 11298 Mudlogger's Morning Report Lease: Rig: Job No.: Exploration Nabors 27 AK-AM-5672885 Footage Last 24 hrs: 1716 Rig Activity: POOH Report For: Mr JackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.03:P. na ft/hr 114.4 ft/hr ( 392 ft/hr @ 10436 GasB~` 4 unit: 68 unit: ( 512 units @ 10175 ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi It~ud Wt In 10.00 ppg Visc 85 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mlud Wt Out 10.00 ppg PV 31 cP YP 22 Ibs/1 Ot1ft2 Gels 15 \ 28 \ 34 MBT pH Sd Bit I?Jo.: 1 Type: PDC Bit Size: Wt ®n Bit: 10.00 RPM: 50 Hrs_ On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0:778 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Sort Trip Depth 8821 ft Short Trig Gas: M3agnet Recover Lbs to Mud Cut: ppg Trip CI: ppm 123 Mud Cut: na ppg Short Trip CI: 43K ppm to Feet of Fill on Bottom: ft Cxirrent Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft ~ units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to 24 hr Rec~ Q~-illing ahead, TD well @ 11298 ft. Circulate and Clean well, POOH. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air J Customer: : 44 Brooks Ran e Petroleum Re ort No ~~ ~ ~ Well: g Tofkat 1 A p . Date: 27/03/2008 Sperry Grilling Services Area: North Slope Depth 11298 Mudlo~ger's Morning Report Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: POOH AK-AM-5672885 Report For: MrJackKeener Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na fUhr @ Gas* na unit: na unit: ( na units @ ( Sample QlJality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt ~ 10_DO ppg Visc 90 secs API Tilt ml . HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10_IDO ppg PV 33 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Short Trip Depth 8821 ft Short Trip Gas: Magnet Ftecovei Lbs to 123 Mud Cut: ppg Trip CI: ppm Mud Cut: na ppg Short Trip CI: 43K ppm to Feet of Fill on Bottom: ft Current Liithology: 50 % CIySt 40 % SLTST 10 % SST Co~,nectior~ Gas and Mud Gut tit units ppg ~ units ppg tft units ppg tit units ppg ft units ft units ft units ft units ~ ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot to to to _ 24 hr Rec< Finish P~JOH, Test BOP's, TIH , Sli and Cut.... Logging Erogineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: : 45 Brooks Ran e Petroleum Re ort No ~~k9 WeH: g Tofkat 1A . p Date: 28/03/2008 Sperry Gr:l~Gng services Area:: North Slope Depth 11298 Mudlogger's Morning Report o Lease: Rig: Job No.: Exploration Footage Last 24 hrs: 0 Nabors 27 Rig Activity: Circ& Cond AK-AM-5672885 Report For: Mr JackKeener Daily Cost $3,075 '' Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na ft/hr @ Gas" 4 unit; na unit: ( na units @ ( Sample Quality x Good ~ Fair Poor ) ) ) Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na .psi Mud Wt In 10.00 ppg Visc 90 secs API felt ml HTHP 2.4 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 32 cP YP 19 Ibs/100ft2 Gels 15 \ 27 \ 32 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: Wt On Bit: 10.00 RPM: 50 Hrs. On Bit: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 47.00 Total Revs on Bit: Footage for Bit Run 6566 Trip Depth: ft Trip Gas: Short Trip Depth 8821 ft Short Trip Gas: Magnet Recover Lbs to 123 Mud Cut: ppg Trip CL ppm Mud Cut: na ppg Short Trip CI: 43K ppm to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ft units ft units ft units ppg ft units ppg ppg ft units ppg ppg ft units ppg ppg ft units ppg Depth Gas in units Max Background to to to to to GAS PEAKS Chromatograph in ppm C1 C2 C3 C4 Tot C5 Tot 24 hr Rec< TIH, displace mud, circulate and condition... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air Customer: Br k R P l t R 46 rt N ~~ ~~~~~ ~ oo s ange ro e eum epo o.: Well: T®fkat 1A Date: 29/03/2008 Sperry drilling SgrvGces Area: North Slope Depth 11298 udlogger's Morning Report 5• Lease: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: Set Cmt.. Job No.: AK-AM-5672885 Report For: Larry-Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr rxa ft/hr ( na ft/hr @ ) Gas* 4 unit; rsa unit: ( na units @ ) ( ) Sample Quality x Good ® Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg \r~sc 80 secs API felt ml H"t"HP ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg P6/ 16 cP YP 38 Ibs/100ft2 Gels 26 \ 28 \ 33 MBT pH Sd Bit No.: 1 Type: hDC Bit Size: 8 112 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 10A0 RPM: 50 Hrs. On Bit: 47.00 Total Rears on Bit: Footage for Bit Run 6566 Trip ®epth: ft Trip Gas: Mid Cut: ppg Trip CI: ppm Short Trip Depth 8821 ft Short Trip Gas: 923 Mud Cut: na ppg Short Trip CL 43K ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to ~~ to 24 hr Rec~ TIH with 2 7/8 in tubing, circulate and ri up and set cement lu , P04H and I/d tubin and wait on cmt.. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 1.00% Gas In Air ii Custom r B k R P l ~'' ~ : e foo s ange etro eum Report No.: 47 Well: Tofkat 1 B Date: 30/03/2008 Sper-ry drilling Services Area: North Slope Depth 4200 udlogger's Morning Report Luse: Exploration Footage Last 24 hrs: 0 Rig: Nabors 27 Rig Activity: TIH Job No.: AK-AM-567288 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr na ft/hr ( na ft/hr @ ) Gas* 4 unit: na unit: ( ~0 units @ ) ( ) Sample Quality x Gooci ~ Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 10.00 ppg Visc 180 secs API felt ml H~HP ml .Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 58 cP YP 29 Ibs/100ft2 Gels 16 \ 38 \ 42 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 7/2 Jets: ~ x 13 x x < TFA: .0.778. Wt On Bit: 10.00 RPM: Hrs. On Bit: Total Revs on Bit: Footage for Bit Run Trip Depth: ft Trip Gas: Maud Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mkid'Cut: na ppg Short TripCl: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 50 '$~ CIySt 40 % SLTST 10 % SST Connection Gas andl Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg pft units ppg ft units ppg ft units ppg ft units ppg ~ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot... to to to ~_ to to 24 hr Rec~ Finish cmt, Test BOP's, M/il.J new BHA, load nukes, TiJH, Shallow Test, contd TIH , Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air I~ : 48 e Petroleum Report No Customer: Brooks Ran ~'~ ~ ~ . g Well: Tofkat 1B Date: 31/03/2008 Sperry Drilling Services Area: North Slope Depth 5502 wlludlogger's Morning report Lease: Exploration Footage Last 24 hrs: 1302 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O_P. na ft/hr 108.5 ft/hr ( 515 ft/hr @ 45'19 ) Gas' 11 unit: 95 unit; ( 123 units @ 5405 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 62/67 spm Flow rate 546 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 2920 psi Maud Wt In 10.00 ppg Visc 125 secs API felt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 10.00 ppg PV 46 cP YP 26 Ibs/100ft2 Gels 18 \ 32 \ 40 MBT pH Sd Bit M1~.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt (fin Bit: 10.00 RPM: 50 Hrs. On Bit: 5.60 Total Revs on Bit: Footage for Bit Run 1302 Triip Depth. ft Trip Gas: Mud Cut: ppg Trip CI: ppm Slroort Trip ®epth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover LbtiS to to Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot t® t® to to to 24 ttr Rec~ D¢111 Cement, kick off , drillin ahead, short tri @ 5502 ft Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 49 Report No Cust©mer: Brooks Ran e Petroleum ~ ~e li~~_1 . g . 1Nell: Tofkat '1 B Date: 01 /04/2008 Sperry ~riil6ng Services Area: North Slope Depth 7975 Mudlogger's IYRorning Report y ~ Lease: Exploration Footage Last 24 hrs: 2473 Rig: Nabors 27 Rig Activity: Short Trip Job. No.: AK-AM 5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Marc R.O.P. 211 ft/hr 103 ft/hr ( 809 ft/hr @ 7814 ) Gas' 121 unit: 88 unit: ( 250 units @ 7855 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/67 spm Flow rate 525 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3377 psi Mud Wt In 1Q..~'f0 ppg Visc 125 secs API felt ml HTHP 3.5 ml Mud Wt at Max Gas 10.0 ppg Mud Wt Out 1(?.~0 ppg PV 46 cP YP 26 Ibs/100ftt2 Gels 18 \ 32 \ 40 MBT pH Sd Bit No.: 1 ~d'ype: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 12-15K RPM: 60 Hrs. On Bit: 16.70 Total Revs on Bit: Footage for Bit Run 3775 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 7975 ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 40 % CIySt 50 % SLTSg 10 % SST Connection Gas and-Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to m to to 24 hr Rec< _ drillin ahead, short tri 7975 ft Logging Engineer: Steven. Jenkins / Ed Jones 10000 units = 100% Gas In Air ii fl : 50 e Petroleum Report No Customer: Brooks Ran ~.`"°~°~~~ . g Vllell: Tofkat 1 B Date: 02/04/2008 spe.r-.~-y drilling se~..:~es Area: North Slope Depth 9492 Mumlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 1517 Rig: Nabors 27 Rig Activity: Short Trip Job No.: AK-AM-562885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. 185 ft/hr 182.8 ft/hr ( 207 ft/hr @ 8722 ) Gas' 130 unit: 111 unit: ( 435 units @ 8900 ) ( ) Samples Quality x Good ~ Fair Poor Pump and Flow Data Pumps 61/68 spm Flow rate 547 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi Mud ~D!1/t In 10.00 ppg Visc 120 secs API felt ml HTHP 3.2 ml Mud Wt at Max Gas 10.0 ppg Mud Y~1/t Out 10.00 ppg PV 47 cP YP 25 Ibs/100ft2 Gels 20 \ 34 \ 41 MBT pH Sd Bit No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt On E~'it: 12-15K RPM: 60 Hrs. On Bit: 25.00 Total Revs on Bit: Footage for Bit Rttn 5292 P Trip ~pth: ft Trip Gas: Mud Cut: ppg Trip CL ppm Short Trip Depth 7975 ft Short Trip Gas: 223 Mud Cut: na .ppg Short Trip CI: 4~k ppm Magnet Recover Lbs to #o Feet of Fill on Bottom: ft Current Lithology: 50 % CIySt 40 % SLTST 10 % SST Connection Gas and Mud Cut ft units ppg ft units ppg ft units ' ppg ft units ppg ft units ppg ft units ~ ppg ft units ppg ft units ppg ft units ' ppg ft units ppg ft units ppg ft units ~ ppg GAS PE/#KS depth Gas in urtits Chromatograph_in ppm f_ Max Background C1 C2 C3 ~ C4 Tot C5 Tot p to '` to to to to 24 hr R~c< TIH f~:short tri , STG 223, Drillin Ahead, Short Tri 9492'. Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100°I° Gas In Air ~J ~] : 51 Custoi~ner: Brooks Range Petroleum Report No ~~~ . 1161e11: Tofkat 1 B Date: 03/04/2008 Sperry ~riiling Services Airea: North Slope Depth 10785 IE(Audlogger's Morning Report o Luse: Exploration Footage Last 24 hrs: 1293 Ftig: Nabors 27 Rig Activity: CO J°b No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max ` R.O.IP. 185 ftlhr 161.6 ft/hr ( 4a0 ft/hr @ 9673 ) Gas' 4 emit: 94 unit: ( 250 units @ 9915 ) ( ) Samlple Quality x Good ~ Fair Poor Pump and Flow Data Pumps 61/68 spm Flow rate 547 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres; 3786 psi Mu~9 Wt In 10.00 ppg vsc 127 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 10.0 ppg Muetl Wt Out 10.00 ppg PV 52 cP YlP 26 Ibs/100ft2 Gels 18 \ 37 \ ## MBT pH Sd Bit Imo.: 1 Type: PDC Bit size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 Wt Q.~i Sit: 12-15K RPM: 60 Hrs. On Sit: 33.00 Total Revs on Bit: Footage for Bit Run 5292 Tri~a Oepth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Shirt Trip Depth 9492 ft Short Trip Gass: 141 Mud Cut: na ppg Short Trip CI: 43k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Cuarent Lithology: 40 % SST 40 % SLTST 20 % SD Connection Gas and Mud Cut ft unilLs ppg ft units ppg : ft units ppg ft units ppg ft units ppg: ft units ppg ft units ppg ft units ppg ' ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr~ Rec~ Dr~lin ahead, losin mud,- well flowin ,increase MW, decrease MWn CO, Pum LCM around.. . Logging Engineer: Steven Jenkins / Ed Jones "` 10000 units = 100% Gas In Air U : 52 ort No Customer: Brooks Ran e Petroleum Re ~"~°'~ ~ p . g Well: Tofkat 1 B Date: 04/04/2008 SpMerry drilling Services Area: North Slope Depth 12442 M{~udlogger's Morning Report 5• Lease: Exploration Footage Last 24 hrs: 1707 Rig: Nabors 27 Rig Activity: drilling ahead ~O~ No.: AK-AM-X672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P'_ 113 ft/hr 71 ft/hr ( 226 ft/hr @ 1221E ) Gas" 58 unit: 62 unit; ( 113 units @ 11962 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 57/65 spm Flow rate 522 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3786 psi Mud Wt In 9.80 ppg Visc 120 secs API felt ml HTHP 3.3 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 9.90 ppg PV 39 cP YP 26 Ibs/100ft2 Ge6s 20 \ 31 \ 37 MBT pH Sd Bit No~_: 1 Type: PDC Brit Size: 8 1/2 Jets: ~ x 13 x x TFA: 0.778 Wt O-°n Bit: 8.00 RPM: 90 Hrs. O>n Bit: 43.10 Total Revs on Bit: Footage for Bit Run 6999 Tripp Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Shoat Trip Depth ft Short Trip Gas: Mud Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 60 % SH 30 % SLTST 10 % - SD Gonnection Gas and Mud Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Ch~romatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to ~._~ 24 hr t2ec~ Drifting Ahead.... Logging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air : 53 Customer: Brooks Ran ort No e Petroleum Re _ ~'~`"~ ~ ~~ . g p Well: Tofkat 16 Date: 05/04/2008 Sperry OrillGng Services Area: North Slope Depth 13770 Mudlogger's Morning Report 5- Lease: Exploration Footage Last 24 hrs: 1328 Rig: Nabors 27 Rig Activity: drilling ahead Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.Q.P. 113 ft/hr 126.5 ft/hr ( 338 ft/hr @ 13296 ) Gas* 42 unit; 58 unit: ( 440 units @ 13200 ) ( ) Sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 53/62 spm Flow rate 493 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3759 psi ~Aud Wt In 9.~0 ppg Visc 130 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg iMud Wt Out 10.90 ppg PV 49. cP YP 27 Ibs/100ft2 Gels 20 \ 33 \ 40 MBT pH Sd B~ No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x 13 x x TFA: 0.778 W9 On Bit: 8.00 RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 8327 Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm ~Ilagnet Recover Lbs to to Feet of Fill on Bottom: ft current Lithology: 30 % SH 40 % SLTST 30 % SST Connections Gas and Mud Cut ft sanits ppg ft units ppg ft units ppg ft snits ppg ft units ppg ft units ppg ft aanits ppg ft units ppg ft units ppg ft a nits ppg ft units ppg ft units ppg GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot 93330 to 1580 153 44 11 1 1 1 to to to to _ . 2~ hr Rec~ Drilling Ahead.... Lagging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air t Customer: Brooks Ran : 54 e Petroleum Re ort No ~ ~ ~' g p . Well: Tofkat 1 B Date: 06/04/2008 Sperry Drilling Services Area: North Slope Depth 15099 Mudlogger's Morning Report os• Lease: Exploration Footage Last 24 hrs: 1329 Rig: Nabors 27 Rig Activity: drilling ahead Job No.: AK AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 ~~ Current 24 hr Avg 24 hr Max R#.O.P. 133 ft/hr 126.5 ft/hr ( 226 ft/hr @ 14441 ) Gaas* 4 unit: 47 unit: ( 178 units ~ 14478 ) ( ) sample Quality x Good ~ Fair Poor Pump and Flow Data Pumps 52!65 spm Flow rate 491 gpm Pump Capacity 4.01 gps Pump Liner & Strk na in. Pump Pres: 3840 psi Mud Wt In 9.90 ppg Visc 110 secs API felt ml HTHP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV 45 cP YP 24 Ibs/100ft2 Gels 17 \ 32 \ 40 MBT pH Sd ~, ~# No.: 1 Type: PDC Bit Size: 8 1/2 Jets: 6 x ` ~ 3 x x TFA: 0.778 It'~;Jt On Bit: 8.00 RPM: 90 Hrs. On Bit: 52.60 Total Revs on Bit: Footage for Bit Run 9656' Trip Depth: ft Trip Gas: Mud Cut: ppg Trip CI: ppm? Short Trip Depth 13200 ft Short Trip Gas: 440 Mud Cut: na ppg Short Trip CI: 40k ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Litho!ogy: 30 % SH 40 % SLTST 30 % SST Connection Gas and Mud Cut ft units ppg ft units =ppg ft units ppg ft punits ppg ft units .ppg ft units ppg: ft _ ~ units ppg ft units ppg ft units ppg,._ ft ~ units .ppg ft units ppg ft units ppg •, GAS PEAKS Depth Gas in units Chromatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 2~4 hr Rec~ Drilling Ahead.... Lapgging Engineer: Steven Jenkins / Ed Jones 10000 units = 100% Gas In Air u Customer: Brooks Ran : 55 e Petroleum Re ort No ~~°' ~ g p . Well: Tofkat 1B Date: 07/04/2008 Sperry drilling s@.-..~~es Area: North Slope Depth 15575 Mudlogger's Morning Report Lease: Exploration Footage Last 24 hrs: 476 Rig: Nabors 27 Rig Activity: POOH Job No.: AK-AM-5672885 Report For: Mr Larry Meyers Daily Cost $3,075 Current 24 hr Avg 24 hr Max R.O.P. na ft/hr 33 ft/hr ( 236 ft/hr @ 15039 ) Gas* na unit: m unit; ( 46 units @ 14815 ) ( ) Sample Quality x Good ® Fair Poor Pump and Flow Data Pumps na spm Flow rate na gpm Pump Capacity na gps Pump Liner & Strk na in. Pump Pres: na psi Mud Wt In 9.90 ppg Visc 110 secs API felt ml H~HP 3.0 ml Mud Wt at Max Gas 9.9 ppg Mud Wt Out 10.00 ppg PV' 44 cP YP 20 IbsJ100ft2 Gels 17 \ 35 \ 42 MBT pH Sd Bit No.: 1 Type: P'®C Bit Size: 8 112 Jets: 6 x 13 x x TFA: 0.778 Wt On Bit: 8.00 RPM: 90 Hrs. On Bit: 67.00 Total Rews on Bit: Footage for Bit Run 10134 Trip Depth: ft Trip Gas: Maid Cut: ppg Trip CI: ppm Short Trip Depth ft Short Trip Gas: Mid Cut: na ppg Short Trip CI: ppm Magnet Recover Lbs to to Feet of Fill on Bottom: ft Current Lithology: 80 % SH 20 % SLTST % SST Connection Gas and Mu~cl Cut ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ft units ppg ~ft units ppg ft units ppg ft units ppg ~ ft units ppg ft units ppg GAS PEAKS ®epth Gas in units Chr+omatograph in ppm Max Background C1 C2 C3 C4 Tot C5 Tot to to to to to 24 hr Rec~ Drilli ahead, reach TD, CO, POOH Logging Engineer: Steven Jenkins J Ed Jones 10000 units = 100% Gas In Air ~ ~ ~ ~ ~ ~ ~ ~ ~ 7 ~ ''~~ ~ ~ ~ ~ ~ ~ ~ +y ~~ WELL NAME: OPERATOR: CONTRACTOR: Sperry Drilling Services. BIT RECORD Totkat lA Brooks Range Petroleum Nabors 27 E LOCATION: Coleville River AREA: Exploration,Nuisgsut STATE: Alaska BHA # Bit # Bit Type BR Size Depth IN Depth OUT Footage Bit Hours TFA AVG ROP WOB RPM PUMP Press PUMP GPM Bit Grade Remarks 1 1 PDC BIT 8.50 3950 11298 7348 44.6 0.778 165.0 8/10 81 3800 560 1-2-WT-A-X-I-CT-TD ~~~~~ ~ ~~ Sperry Drilling Services Oil Base Mud Report Company: Brooks Range Petroleum Well Tofkat 1 B Rig Nabors 27 Mud Co MI Area North Slope, Alaska Spud Date 27 March 2008 TD Date: April 6th 2008 Exploration, Nuisqsut. Date Depth ft - MD Wt ppg Vis sec PV YP Ib/100 Gels ib/~ootrr Filt m/30m soa3oa2oonoas~ ak 2nd Solids % Water % Sd % CI Mg/L Salt %Wt Lime Ib/bbl pH Oil- O/VII ratio Remarks 27-Mar 3989 10.00 90 32 19 15/27/32 1.0 83/51/36/22/10/8 2 12.5 24.5 0.00 49k 23.8 0.9 80 63.0 72/28 Ser Ri ,POOH, Cement 'ob 28-Mar 3989 10.00 90 32 19 15/26/31 1.0 70/54/48/41/30/29 2 12.5 24.5 0.00 49k 23.8 0.8 80 63.0 0 29-Mar 3989 10.00 90 32 19 14/24/31 1.0 ias/s7iso/3s/i~/~o 1 12.5 24.5 0.00 49k 23.8 0.8 80 63.0 70/30 RIH, TAG Drill a head. 30-Mar 5200 10.00 137 58 30 24/32/40 1.0 gas/ss/ss/av~a/is 1 11.6 24 0.00 42k 14.8 0.9 80 62.0 62/38 Short tri ,Drillin 31-Mar 7350 10.00 125 46 26 18/32/40 1.0 118/72/55/36/13/14 1 11.6 25 0.00 39k 19.6 1.3 80 62.0 71/29 Short tri ,Drillin 01-A r 8750 10.00 120 47 25 20/34/41 1.0 iis/7vsa/3s/~v~3/ 1 10.6 26 0.00 43k 20.6 1.8 80 62.0 70/30 Swee ,Drillin 02-A r 10780 10.10 127 52 26 18/37/45 1.0 Bons/ss/3s/~v~v 1 12.0 26 0.00 43k 20.6 2.1 80 62.0 70/30 Drillin Ahead ,swee 03-A r 11807 9.80 120 39 26 20/31/37 1.0 104/65/56/37/16/15 1 10.7 26 0.00 40k 19.4 1.7 80 62.0 70/30 Drillin Ahead ,swee 04-A r 13295 9.90 110 49 27 20/33/40 1.0 125/76/63/42/16/15 1 10.4 26 0.00 40k 20.0 1.8 80 62.0 70/30 Drillin Ahead 05-A r 14649 9.90 110 45 24 17/32/40 1.0 114/69/53/36/13/12 1 10.5 26 0.00 40k 19.4 1.8 00 62.0 70/30 Drillin Ahead 06-A r 15575 10.00 110 44 20 17/35/42 1.0 108/64/46/30/13/11 1 10.4 26 0.00 41k 19.8 1.8 80 62.0 70/30 T.D. WELL. 07-A r 15575 10.00 126 49 27 17/32/40 1.0 125/77/54/36/14/13 1 10.0 26 0.00 40k 19.4 1.8 80 62.0 70/30 Ri u for Side wall cores 08-A r 15575 10.00 119 49 27 17/32/40 1.0 125!76/54/36/14/13 1 10.4 26 0.00 41 k 19.8 1.8 80 62.0 70/30 Side wall cores, TD . Brooks Range Petroleum Tofka# 1 A API-50-103-20567-01 C D DATA EOWR EMF and PDF LOGS HALLIBURTON Sperry Drilling Services Sperry Drilling Service Brooks Range Petro Tofkat # 1 A Tops Prognosis Drilled SSTV D M D M D TV D SSTV D Drill Flooi 32.9 K.B. 32.9 Permafrost base W Sak Shale Wall (K-5) Shoe I 3857 Surface Casing 3911 3032 2999 Topset 3 -4118 5938 4154 -4121 Qannik C40 -4380 6744 6232 4350 -4317 top Albian Top Turbidites -5900 9972 8903 5865 -5865 H RZ -6765 11,457 10450 6757 -6757 Kalubik -6940 11,783 10844 6967 -6967 LCU -7020 12,120 11121 7097 -7097 TD -7650 13,206 11297 7169 -7169 TD Date Sidetrack TD ITVD 19-Mar 20-Mar 21-Mar 4742' 3417 22-Mar 6067' 4233 23-Mar 7715' 5189 Brooks Range Petroleum TOFKATIA AP 1-050-103-20567-01 2" M D MUDLOG • Sperry Drilling Services Brooks Range Petroleum TOFKATIA AP 1-050-103-20567-01 2" TVD MUDLOG LLIIlTO Sperry Drilling Services Brooks Range Petroleum TOFKATIA AP 1-050-103-20567-01 5" M D MUDLOG - '- f Sperry Drilling Services ~ ~ •