Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-056 RECEIVED STATE OF ALASKA • • ALASKA OIL AND GAS CONSERVATION COMMISSION APR 0 7 2015 WELL COMPLETION OR RECOMPLETION REPORT AND LOGOGCC la. Well Status: ❑Oil 0 Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended 1b. Well Class 20AAC 25 105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL El Other No.of Completions Zero • ® Development 0 Service 2. Operator Name: 5. Date Comp.,Susp.,orkAband.: ` 12. Permit to Drill Number BP Exploration (Alaska) Inc. 3/14/2015 209-056 • 315-028 3. Address: 6. Date Spudded: 13. API Number P.O. Box 196612, Anchorage,Alaska 99519-6612 6/13/2009 50-029-20643-01-00 - 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 6/15/2009 PBU G-16A . 3414' FNL, 3003' FEL, Sec. 12, T11 N, R13E, UM 8. KB(ft above MSL): 77.08' • 15. Field/Pool(s) Top of Productive Horizon: 4772' FNL,490' FEL, Sec. 11, T11 N, R13E, UM GL(ft above MSL): 40.08' ` Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 4268' FNL, 817' FWL, Sec. 12, T11 N, R13E, UM ' 9373' 8447' • 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 657241 ' y- 5968213' Zone- ASP4 •11463' 9048' • ADL 028280 TPI: x- 654504 y- 5966798 Zone- ASP4 11. SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 655800 Y- 5967329 Zone- ASP4 None 18. Directional Survey: ❑Yes ® No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 2098' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR/GR, GR/CCL/CNL 9750' ' 8800' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor 38' 118' 38' 118' 36" 8 cu yds Concrete 13-3/8" 72# L-80 37' 2684' 37' 2684' 17-1/2" 3621 cu ft Permafrost II 9-5/8" 47# L-80 36' 9347' , 36' 8422' 12-1/4" 1277 cu ft Class'G', 130 cu ft PF'C' 7" 26# L-80 8852' 9750' 7968' 8800' 8-1/2" 372 cu ft Class'G' 7"k5-1/2"x4-1/2"x3-1/2" 26#117#/12.6#/9.2# L-80/13Cr80/L-80 1993' 9596' 1993' 8656' Scab Liner 1207 cu ft Class'G' 2-3/8" 4.7# L-80 9384' 11463' 8457' 9048' 3" 28 cu ft Class'G', Uncemented Slotted Liner 24. Open to production or injection? 0 Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) of Top&Bottom; Perforation Size and Number): 4-1/2", 12.6#, 13Cr80 8700' 8557'/7701' • 1� t� i 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. MF,p MAY 2 0 20 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?0 Yes ® No ,�. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED NI. 9373' Set Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Productin N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired'? 0 Yes ® No • Sidewall Core(s)Acquired? 0 Yes ® No . If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED ON REVERSESubmit Original Only V1- G 5/ii 15 RBDMS• APR 1 8 2015 v , t.Ss.i/i:t /CT 29. GEOLOGIC MARKERS(List all formations ar 3rkers encounter 30. FORMATION TESTS NAME il TVD Well Tested .J Yes ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed,and submit detailed test information per 20 AAC 25.071. 25N 9812' 8859' None 23N 9863' 8908' 22N 9887' 8931' 21N 9941' 8978' Zone 1B 10007' 9022' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: J.Kyle Raese,564-4629 Email: John.Raese©bp.com Printed Name: Joe Lastufk Title: Drilling Technologist L Signature: -Rhone 564-4091 Date: 4!1`15 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only • G-16A, Well History (Pre-Rig Sidetrack) Date Summary 01/29/15 INITIAL T/I/O=2300/320/0 PSI. RIG UP ELINE EQUIPMENT. SET BAKER 3 1/2" MONOBORE WHIPSTOCK AT 9376'TOP OF WHIPSTOCK. 180 DEG ORIENTATION. CCL TO TOP OF WS= 16', CCL STOP DEPTH =9360'. (2) RA TAGS INSTALLED 5.0'FROM TOP OF WHIPSTOCK. CORRELATED TO MEMORY DEPTH CORRELATION LOG DATED 16-DEC-2014. WELL SHUT IN ON DEPARTURE. DSO NOTIFIED. FINAL T/I/O=2330/325/0 PSI. 01/31/15 T/I/O=2370/350/0. Temp=SI. Bleed WHPs to 0 psi (pre CTD). No AL. TBG FL @ 8800' (333' below sta #1). IA FL @ surface. Bled IAP to 0+ psi in 30 min (1 bbl). G-17 flowing in LP—150'away. Final WHPs= 2370/10/0. SV, WV, SSV=C. MV=0. IA, OA=OTG. 16:30 hrs. 02/02/15 T/I/O=2330/30/0.Temp=SI. Bleed WHPs to 0 psi (Pre CTD). No AL.TBG FL @ 8650'(183'below sta #1). IA FL @ surface. Bled TBG to production to G-17(130'of CNG hose). During TBG bleed TBGP increased 80 psi to 2410 psi and IAP increased 710 psi to 740 psi in 40 min.TBG and IA FL unchanged. Called WIE, RD TBG bleed. Bled IAP to slop tank from 740 psi to 0 psi in 30 min with .6 bbi return. Final WHPs=2400/0/0. SV, WV, SSV=C. MV=0. IA, OA=OTG. 15:00. 02/20/15 T/I/O= MV/20NAC.Temp=SI.WHP's(pre rig). No AL. SV,WV, SSV, MV=C. IA, OA=OTG. NOVP. 16:30. 02/24/15 T/I/0=2400/0/0. Pre CTD, Install TS#05, and Set 4"TWC#293. Final WHP's TWC/0/0. Page 1 of 1 • North America-ALASKA-BP Page 1 0196' Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53) i I Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/11/2015 - MOB P PRE BEGIN RIG MOVE TO G-PAD 13:00 - 14:30 1.50 MOB N RREP PRE CONDUCT FUNCTION CHECK OF MOVING SYSTEM WHILE WARMING UP. FOUND ONE DRIVE MOTOR HAS ISSUES. REPLACEMENT MOTOR ON SITE,CHANGE OUT DRIVE MOTOR PER PLANNED MAINTENANCE. FUNCTION TEST,ALL GOOD. 14:30 - 16:00 1.50 MOB P PRE INSPECT AROUND RIG IN PREPARATION FOR RIG MOVE,CLEAN LAST AREA OF PACKED SNOW TO OPEN CELLAR DOORS. PJSM ON PULLING OFF OF WELL. MOVE OFF OF D-18 WITH NO ISSUES. 16:00 - 22:00 6.00 MOB N WAIT PRE STAGE RIG TO SIDE OF D-PAD. CONDUCT ROUTE DRIVE TO END OF PAD ENTRANCE. MOVE MAT BOARDS,CLEAN UP AROUND WELL D-18 WHILE WAITING ON SECURITY. 2200 - 00:00 2.00 MOB P PRE MOVE RIG FROM D PAD&HEAD TOG PAD. 3/12/2015 00:00 - 04:00 4.00 MOB P PRE CONTINUE TO MOVE RIG FROM D PAD.SET RIG DOWN AT PAD ENTRANCE. 04:00 06:00 2.00 MOB N WAIT I PRE WAIT ON WEATHER. 06:00 - 08:30 2.50 MOB N WAIT PRE CONDUCT CREW CHANGE OUT AND WALKAROUNDS. CONTINUE TO WAIT ON WEATHER;TEMP-39 AMBIENT,TRUCKING SUPPORT NOT ALLOWED TO MOVE YET. 08:30 - 13:15 4.75 MOB N WAIT PRE TRUCKING SUPPORT AT D-PAD,MOVING PARTS TRAILER TO LOCATION. CREW OVER TO D-PAD TO RETRIEVE CRIBBING FOR PLACING RIG ON. 13:15 - 18:30 5.25 MOB P PRE WEATHER NOT BREAKING. DE-RATE LOADER EQUIPMENT PER BP POLICY IN AGREEMENT WITH NORDIC SUPERVISOR AND SAFETY REP. COMPLETE HACL AND CONDUCT SAFETY MEETING ON MOVING MAT BOARDS. MOVE MAT BOARDS INTO POSITION ON WELL FOR SETTING RIG DOWN.BACK OVER WELL.ACCEPT RIG AT 16:00. 18:30 - 19:00 0.50 MOB P PRE PJSM REGARDING LEAK TITE TEST&ND TREE CAP. 19:00 - 00:00 5.00 MOB P PRE LEAK TITE TEST TREE CAP.ND TREE CAP. NU BOP'S.SECURE VVITH 4-WAY CHAINS.RU I 7-5/8"LUBRICTOR.CONCURRENTLY,HOIST REEL&DROP INTO INTO REEL HOUSE.RU INNER REEL IRON.SPOT&RU TIGER TANK& HARDLINE.TEST TIGER TANK HARDLINE TO 250PSI/4000PSI. 3/13/2015 00:00 - 01:30 1.50 BOPSUR P PRE CONTINUE TO NU BOPE.FILL STACK WITH WATER.FLUSH MGS.GET STACK MEASUREMENTS. Printed 3/16/2015 12:48:52PM • North America-ALASKA-BP Page iaRt Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 05:45 4.25 BOPSUR P PRE SHELL TEST BOPE-PASS. START BOP TEST. STATE GIVEN NOTIFICATION OF BOPE TEST 03/10/2015 12:55 STATE INSPECTOR BOB NOBLE WAIVED WITNESS 03/12/2015 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,PTD#215012,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -ALL 2"PIPE RAMS TESTED WITH 2"TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT ANNULAR TESTED WITH BOTH 2-3/8"AND 2" TEST JOINT TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY WSL OR TOUR PUSHER -BLIND RAMS PASSED LOW PRESSURE TEST BUT FAILED INITIAL HIGH PRESSURE TEST 05:45 - 06:15 0.50 BOPSUR N RREP PRE OPEN UP DOORS,INSPECT BLADE SEALS- IN GOOD CONDITION;SWAP OUT BLADE SEALS. INSPECT RAM BLOCKS AND THEY ARE INSTALLED CORRECTLY,REPLACE AND RETEST. GOOD LOW PRESSURE TEST AGAIN BUT FAILED HIGH PRESSURE TEST. 06:15 - 11:00 4.75 BOPSUR P PRE CONTINUE WITH BOP TESTING OF OTHER COMPONENTS WHILE INVESTIGATING FAILURE CAUSE. -TEST ALL AUDIBLE AND VISUAL ALARMS, PASS -CONTINUE WITH TESTING BOP COMPONENTS,ALL TESTS GOOD 11:00 - 12:00 1.00 BOPSUR N RREP PRE RE-TEST BLIND RAMS. LOW PRESSURE TEST TO 250 PSI GOOD. CONDUCT HIGH PRESSURE TEST TO 3500 PSI,ALL GOOD. SEE TRACTION REPORT 4952165 FOR DRILLING TROUBLE TIME REPORT DUE TO RE-TEST OF BLIND RAM DURING BOP TEST. 12:00 - 14:45 2.75 BOPSUR P PRE PREP COIL FOR PRESSURE TEST,INSTALL E-LINE BOOT. STAB ON,PT QTS,PUMP METHANOL SPEAR,FILL COIL WITH WARM WATER. CIRCULATE TO ENSURE COIL IS FREE AND TO WARM IT UP. PRESSURE TEST INNER REEL IRON AND HARD IRON IN REELHOUSE. TESTS GOOD. 14:45 - 15:30 0.75 RIGU P PRE REVERSE CIRCULATE TO PUMP SLACK BACK. Printed 3/16/2015 12:48:52PM North America-ALASKA-BP Page 3* Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PBG Pad Rig Name/No.:NORDIC 2 Spud DateTme:9/24/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 16:45 1.25 RIGU P PRE POP OFF,INSTALL COIL CUTTER. CUT 250' OF COIL. 16:45 - 17:15 0.50 RIGU P I PRE CONDUCT RIG EVACUATION DRILL. HOLD AAR,DISCUSSED COMMUNICATION AND MUSTER POINTS,IDENTIFIED PERSONNEL j WHO CAN GIVE COMMAND TO CONTROL RIG 1 ESD TO SHUT IT DOWN. GIVE ALL CLEAR, PERSONNEL BACK TO RIG. 17:15 - 21:35 4.33 RIGU P PRE PREP END OF COIL FOR RE-HEADING. RE-HEAD WITH CONNECTOR AND BAKER INTEQ TOOLS,DUAL BACK PRESSURE VALVES.PULL TEST TO 32K.PUMP SLACK FORWARD.HEAD UP BHI UQC. CONCURRENTLY,TORQUE TREE BOLTS, VERY MINOR ADJUSTMENT. 21:35 - 22:00 0.42 RIGU P PRE PRESSURE TEST UQC 250PSI/4000PSI- _ PASS. 22:00 - 23:30 1.50 RIGU P - PRE RU TO PULL TWC.PRESSURE TEST 250PSI/4000PSI-PASS.PULL TWC.2472PSI BELOW TWC.LD DSM LUBRICATOR. 23:30 - 00:00 0.50 RIGU -N SFAL PRE -. TEST FLOATS-FAILED THREE TIMES,FAST - BLEED OFF.BREAK OFF UQC.REMOVE -CHECKS-PACKED WITH CEMENT CHUNKS. 3/14/2015 00:00 - 02:30 2.50 RIGU N SFAL PRE PUMP 1%8.6PPG KCL THRU COIL AT 1.5BPM/1000PSI TO REMOVE ANY REMAINING CEMENT CHUNKS FROM COIL.INSTALL FLOATS.TORQUE UP UQC.TEST FLOATS 250PSI/3500PSI-PASS. 02:30 - 02:40 0.17 RIGU P PRE PJSM REGARDING KILL WELL. •02:40 - 04:37 1.95 RIGU P PRE KILL WELL WITH 5BBLS OF METHANOL FOLLOWED BY 220BBLS OF 1%KCL.STOP AT 220BBLS&FLOW CHECK PER OCN-OK. PUMP REMAINING 70BBLS OF KCL FOLLOWED BYATUBING VOLUME OF 138BBLS OF 9.5PPG POWER PRO MUD. INITIAL WHP 2400PSI.USE PUMP#1 DOWN KILL LINE AT 3.3BPM&PUMP#2 DOWN COIL AT 2.25BPM.BLEED DOWN IA&OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. 04:37 - 05:20 0.72 RIGU N HMAN PRE 1FLOW CHECK-FAIL.SHUT IN WELL- OPSI. MAKE NOTIFICATIONS.RIH 150'TO PREVENT COIL FREEZE UP,-7PSI.AGREE TO VERIFY WHP.VAC.FILL HOLE,0.5BPM IN&0.4BPM OUT.ISSUE SOLVED-THE VAC TRUCK WITH 10PSI LINED UP ON PUMP#1 FED THRU THE PUMP INTO THE WELL VIA THE KILL LINE- I GOOD RESPONSE&PROBLEM SOLVING BY CREW. 05:20 - 06:30 1.17 RIGU P PRE FLOW CHECK-PASS.0.7BBLS TO FILL. 0.688PM IN/0.56BPM OUT.POH.FLOW CHECK -PASS.CIRC TO KEEP HOLE FULL WHILE CHANGE OUT WITH DAY CREW. 06:30 - 07:15 0.75 STMILL P WEXIT MU MILLING BHA PER PROGRAM WITH WEATHERFORD 1.25°FIXED BEND MOTOR AND 2.80"MILL. MILL 2.80"NO-GO. STRING MILL GO AT 2.80",NO-GO AT 2.79". STAB ON, PRESSURE TEST QTS. LOSSES WHILE AT SURFACE AVERAGING 6 BPH. Printed 3/16/2015 12:48:52PM North America-ALASKA-BP Page 4 cgild Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay I Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM i Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:15 - 09:30 2.25 STMILL P WEXIT RIH WITH MILLING ASSEMBLY. NO ISSUES WHILE RIH. LOSS RATE OF-7 BPH INITIAL SLOWED TO 0 BPH AT 4000'MD WHILE RIH. 09:30 - 10:30 1.00 STMILL P WEXIT LOG TIE-IN FOR DEPTH CONTROL WITH-2' CORRECTION. PICK BACK UP AND LOG CCL FOR LINER TOP PLACEMENT LATER IN WELL. 10:30 - 13:00 2.50 STMILL P WEXIT MOVE DOWN TO TAG WHIPSTOCK TAG WHIPSTOCK AT 9373'. PICK UP,RECORD SLOW PUMP RATES AND PARAMETERS;SOW 16.2K,PUW 31K. MOVE DOWN AND ENGAGE WHIPSTOCK AT 1.73 BPM,3360 PSI FREE SPIN. ENGAGE WHIPSTOCK AT 9373'. ATTEMPT TO MILL,ORIENTATION JUMPED TO 0°WITH LESS THAN 120 LBS WOB. PICK UP, ATTEMPT TO ENGAGE AGAIN,ORIENT MILL AROUND AND RE-SET AT 180°. I-ENGAGE TRAY,INCREASE WOB UP TO 400 !LBS,ALLOW TO DROP OFF AND ORIENTATION WHIPPED AROUND AGAIN WITH 160 LBS WOB. DROP FLOW RATE TO 1.5 BPM,STILL HAVING ERRATIC READINGS. -PICK UP TO MIDPOINT OF JOINT TO -ENSURE HOT IS BETWEEN COLLARS,STILL GETTING ERRATIC READINGS. DD AND WSL AGREE THAT THIS IS NOT GOING AS PLANNED,DISCUSS WITH BP SUPERINTENDENT. DECIDE TO POH FOR BHA INSPECTION. -MW IN 9.5 PPG,MW OUT 9.45 PPG. LOSSES AVERAGING 6-7 BPH WHILE ON BOTTOM CONDUCTING PUMPING OPERATIONS 13:00 - 14:30 1.50 STMILL N DPRB 9,373.00 WEXIT FLOW CHECK,NO FLOW.POH WITH BHA. FLOW CHECK AT SURFACE,ALL GOOD. LOSSES OVER FULL TRIP WERE 6 BBLS. 14:30 - 16:00 1.50 STMILL N DPRB 9,373.00 WEXIT TAG UP,POP OFF AND BREAK OFF FROM BHA. STAND INJECTOR BACK STAND BACK UPPER PORTION OF BHA,BREAK OFF MOTOR FROM LOWER PORTION. ,RE-SCRIBE MOTOR TO HIGH SIDE FOR !DIRECTIONAL CONTROL. WINDOW MILL !GAUGE 2.80"NO-GO. -MAKE UP NEW BHA WITH CHANGE OUT OF LOWER PORTION TO INCLUDE GAMMA AND ORIENTING SUBS. STAB ON,PRESSURE TEST QTS. -NO LOSSES WHILE AT SURFACE 16:00 - 17:35 1.58 STMILL N DPRB 9,373.00 WEXIT RIH WITH BHA. 17:35 - 18:00 0.42 STMILL N DPRB 9,373.00 WEXIT LOG DOWN FOR TIE-IN FROM 9170',MINUS 2' CORRECTION. 18:00 - 19:00 1.00 STMILL N DPRB I 9,373.00 WEXIT CONTINUE TO RIH.GET SPR'S.DRY TAG AT 9372.72'.BLEED DOWN IA&OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. Printed 3/16/2015 12:48:52PM • North America-ALASKA-BP Page 54:31 81 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53)Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 00:00 5.00 STMILL P WEXIT MILL DUAL STRING-WINDOW FROM 9372.00' 51-A4 USING 9.5PPG POWER PRO �/V{ -PUMPS AT 1.78 BPM,FREESPIN AT 3400 PSI 6-1v13 -MW IN/OUT 9.55/9.48 PPG 1-MM IN/OUT 1.78/1.78 BPM -START OFF TRYING TO GET 300 PSI MOTORWORK&MAINTAIN 1'/HR PER WELL PLAN. 19:30 PARAMETERS,9372.5' PUMPS MM IN/OUT 1.78/1.76 BPM,WOB 0.96K, MOTOR WORK 223 PSI,ECD 10.26 PPG 20:00 PARAMETERS,9372.9' PUMPS MM IN/OUT 1.78/1.76 BPM,WOB 1.96K, MOTOR WORK 284 PSI,ECD 10.26 PPG 20:30 PARAMETERS.9373.4' STALL AT 9373.4'WITH-2.8KWOB.PUH& START OVER.PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 1.23K,MOTOR WORK 100 PSI,ECD 10.25PPG 21:00 PARAMETERS,9373.6' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.6K, MOTOR WORK 253 PSI,ECD 10.26 PPG 21:30 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 22:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 22:30 PARAMETERS,9375.0' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 1.77K, MOTOR WORK 239 PSI,ECD 10.26 PPG 23:00 PARAMETERS,937.5' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.98K, MOTOR WORK 245 PSI,ECD 10.25 PPG 23:30 PARAMETERS,9375.8' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 2.21K, MOTOR WORK 242 PSI,ECD 10.25 PPG 24:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG Printed 3/16/2015 12:48:52PM • North America-ALASKA-BP Page 6 oto Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/13/2015 End Date: X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/15/2015 00:00 - 04:35 4.58 STMILL P WEXIT CONTINUE TO MILL DUAL STRING EXIT FROM 9374.2'AT 1'/HR OR 300PSI MW USING 9.5PPG POWER PRO. 00:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 00:30 PARAMETERS,9376.6' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.6K, MOTOR WORK 253 PSI,ECD 10.26 PPG 01:00 PARAMETERS,9376.6'SLOW DOWN TO .5'/HR&LET MILL OFF DUE TO 375+PSI MW. PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.2K, MOTOR WORK 375 PSI,ECD 10.25 PPG 01:30 PARAMETERS,9377.0'BLEED DOWN IA &OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.7K, MOTOR WORK 362 PSI,ECD 10.25 PPG 02:00 PARAMETERS,9377.4' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 4.1K, MOTOR WORK 378 PSI,ECD 10.25 PPG.MAX WOB-4.69K FOR 10 MIN. 02:15 PARAMETERS,9377.6'LOSING WOB- MILLING BREAK(PLANNED)DONE MILLING 3-1/2"&NOW LEAD MILL IS MILLING REST OF 7" PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 3.1K, MOTOR WORK 315 PSI,ECD 10.25 PPG 02:30 PARAMETERS,9377.7' PUMPS MM IN/OUT 1.73/1.72 BPM,WOB 2.6K, MOTOR WORK 322 PSI,ECD 10.25 PPG 03:00 PARAMETERS,9378.2' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 1.4K, MOTOR WORK 150 PSI,ECD 10.25 PPG 03:30 PARAMETERS,9378.2' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 0.93K, MOTOR WORK 175 PSI,ECD 10.25 PPG 04:00 PARAMETERS,9379.0'LEAD MILL SHOULD BE FULLY OUT.1.1'TO GO FOR S.R. TO EXIT. PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 0.98K, MOTOR WORK 120 PSI,ECD 10.25 PPG 04:30 PARAMETERS,9379.5' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 0.84K, MOTOR WORK 65 PSI,ECD 10.25 PPG 04:35 - 06:30 1.92 STMILL P WEXIT MILL RAT HOLE USING 9.5PPG POWER PRO MUD AT-10'/HR WITH TARGET OF 300PSI MW&5.5K WOB 1.73BPM IN/1.72BPM OUT,MTR WRK:200-400 PSI WOB:2.0-4.5K# PVT:307 BBLS,MW IN/OUT:9.54/9.45 PPG ECD/IA/OA:10.24 PPG/179 PSI/128 PSI MILL TO 9389'. 06:30 - 09:00 2.50 STMILL P WEXIT CONDUCT REAM PASSES PER WELL PLAN. AFTER THREE COMPLETE PASSES, CONDUCT A LEFT AND RIGHT SIDE REAM AT 15°OUT FROM WINDOW IN ATTEMPT TO SMOOTH TRANSITION. DRY DRIFT GOOD. PUMP SAMPLE UP FOR GEO. FLOW CHECK OFF BOTTOM,ALL GOOD. Printed 3/16/2015 12:48:52PM 'TREE= . 4-1/16"CATV WELL HADCAN G-1 6A SAL NOTES: WELL ANGLE>70"@ 10045'""" MAX ACT1riATOR= BAKER C DOGLEG:52.2"@9971'*** 4-112"CHROME TBG'"' KB.ELEV= 77.08' ' I BF.ELEV= 41.53' / KOP= 3500' 2215' H4-1/2"HES X NP,D=3.813" Max Angle= 96' 10210' CONDUCTORH ? © Datum MD= 9831' -# ,L A Datum ND= 8800'SS ID= " / or - GAS LFT MANDRELS// ST MD ND DEV TYPE VLV LATCH PORT DATE 7"BKR LNR TE BACK,D=7.50" -j 1993' 3 3286 3285 5 KBG-2 DAN BK 0 05/26/11 1 9-5/8"X 7"ZXP LW w/HGR,D=6.276" 2004' +: 2 7179 6503 35 KBG-2 MY BK 0 05/26/11 1 8467 7620 25 KBG-2 DRAY BK 0 10/05/03 9-5/8"DV PACKER -{ 2585' lei C,I/, 344 8536' H4-1/2"IES X NP,D=3.813" 13-3/8"CSG,72#,N-80,D=12.347" -I 2684' 197. 114 " ►tet :.i,; Minimum ID -2.250 9391' ., 8557' -17"x 4-1/2"BKR S-3 PKR,D=3.875" 2.70" DEPLOYMENT SLV +�vb NIP 8669' 4-1/2"HES xNIP,D=3.813" 7"LNR,26#,L-80 BTC,.038.3 bpf, D=6.276" - 8678' 5-1/2"TBG,17#,L-80 BTC,.0232 bpf,D �ry�'=4.892" -1 8700' ' S 8678' -17"X 5-1/2"X0,13=4.892" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, 8700' 8700' H4-1/2"HALF HOE,D=3.958" .0152 bpf,ID=3.958" 8700" -j51/2"X4712"X0,D=3.958" 4-1/2"SCAB LNR 12.6#,13CR-80 VAM TOP, 8723' IVO 8712' -14-1/2"HES X NP,.0152 bpf,D=3.958" D=3.813" Ird 4-1/2"TBG CUT(07/10/03) 8735' f 10,1 :Air 8730' H9-5/8"X 7"UNIQUE MACI-E'E OVERSHOT t s!• 8761' -14-1/2"X 7"TBG XO,13=3.958' I OM I 103 31 4-1/2'TBG,12.6#,L-80,.0152 bpf,D=3.958" -{ 8795' 74'M ` �I 8761' H9-5/8"X 5-112"SBR D= " 04f 8789' H9-5/8"X 4-1/2"0115 RH PKR D=3.93" TOP OF 7"LNR 8853' liAN fI llil 8795' -14-112-X 3-1/2"XO,D=2.992' I 9-5/8"CSG,47#,L-80,D=8.681' 9347' lb 8853' ---19-5/8"X 7"BOT L142 PKR D= 3-1/2"BKR MONOBORE W-IPSTOCK 9373' (le SA (TAGGED 03/14/15)w/2 RA PIP TAGS 0-9381' 7"CIRC HOLES N 3-1/2"TBG(CMTD) 9494'-9497' 9391' --{2.70"DEPLOYMENT SLV,D=2.250" 3-1/2'TBG,9.2#,L-80 8RD,.0087 Opt,D=2.992" - 9595' 1.1:14 i �►- 9596' Hr X 3-1/2*OTIS HCL PKR,D=3.88"? ROT HOLE WHIPSTOCK(06/11/09) 9750` ....I go; IVE_LOUT WINDOW(G-16A) 9750'-9757' 7"LNR,26#,L-80,.0383 bpf,D=6.276" -{ -9760 �3*� PP TAG(06/12/09) 9755' ` 10120' H1.71'HES CEP(09/12/09) 7"MARKER JOINT 9771' 10199' H PORTED SUB PERFORATION SIL9AARY REF LOG:BKR HUGHES M IDGR on 06/14/09 ANGLE AT TOP PERF:57'©10000' �l►��i Note:Refer to Production DB for historical pert data -,, SIZE SPF INTERVAL OPAYSQZ SH 'OT SOZ .`ms- 1.56' 6 10000-10020 0 09/13/10 ""� 1.56" 6 10020-10040 0 09/13/10 FETID 11461' 2-3/8" SLOT 10329-11462 C 09/13/10 2-3/8"SLOTTED LNR 4.7#,L-80 STL, 11463' D=1.995' DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 11/25/14 PJC REFORMATTING VVELL: G-16A 02113/88 N1 ES RWO 12/10/14 CRR/PJC 7'LNR CORRECTION-CMI'D PERMIT No:'2090560 10/05/03 N3ES RWO 12/18/14 WKP/JMD PULLED LTP(12/16/14) API No: 50-029-20643-01 06/18/09 NORDICI CTD SIDETRACK(G-16A) 01/29/15'MG8/PJC SET MONOBORE WiPSTOCK SEC 12,T11N,R13E,1865'FSL&2277'FWL 06/01/11 UAV/PJC GLV C/O(05/26/11) 03/14/15 PJC 'WHIPSTOCK TAG DEPTH UPDATE 01/07/12 GJF/PJC NIPPLE CORRECTIONS BP Exploration(Alaska) OF Thy ' �,���j�jj�s� THE STATE Alaska Oil and Gas Fs�� �, of Conservation Commission ---=-4* ALASI�:A :cam _-.____ • it _._ _ 333 West Seventh Avenue ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 r�-".'�' Main: 907.279.1433 - ALAS' Fax: 907.276 7542 SCANNED JAN 2 6 2015www.aoacc.alaska.gov John McMullen Engineering Team Leader r BP Exploration (Alaska), Inc. ao - 4. 1 P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-16A Sundry Number: 315-028 Dear Ms. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, r / /0_ 92..e. 54.‘__ Cathy P. Foerster Chair �, LA DATED this 2 day of January, 2015 Encl. STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 0 2015 APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 AOGCC 1 Type of Request: • ❑Abandon ®Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Change Approved Program ❑Suspend 0 Plug Perforations ❑Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate ❑Alter Casing 0 Other 2. Operator Name 4 Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic 209-056 - 3. Address: 6. API Number: ®Development ❑Service P.O. Box 196612,Anchorage,Alaska 99519-6612 • 50.029-20643-01-00 • 7 If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU G-16A Will planned perforations require a Spacing Exception? 0 Yes No 9. Property Designatior 10.Field/Pool(s): ADL 028280 • Prudhoe Bay/Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft). Effective Depth TVD (ft): Plugs(measured): Junk(measured) 11463' , 9048' • 11462' • 9048' , 10120' None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"x 30" 38'- 118' 38'- 118' Surface 2647' 13-3/8" 37'-2684' 37'-2684' 4930 2670 Intermediate 9311' 9-5/8" 36'-9347' 36'-8422' 6870 4750 Production Liner 1343' 7" 8852'- 10195' 7968'-9045' 7240 5410 Scab Liner 7603' 7"x 5-1/2"x 4-1/2 x 3-1/2" 1993'-9596' 1993'-8656' Liner 2079' 2-3/8" 9391'-11463' 8464'-9048' 11200 11780 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10000'-10040',Slotted Liner 10329'-11462' 9018'-9037',Slotted Liner 9036'-9048' 4-1/2", 12.6# 13C r80 8700' Packers and SSSV Type: 7"x 4-1/2"Baker S-3 Packer Packers and SSSV 8557'/7701' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: 0 Description Summary of Proposal 0 BOP Sketch 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation February 1,2015 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG 0 Suspended • 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. J.Kyle Raese,564-4629 Printed Name: Joh c Title: Engineering Team Leader Em 1: John.Raese a(�,bp.com Signature: Phone 564-4711 Date: ((77 // Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 1 5_0255- J o Plug Integrity ,_,/ BOP Test 0 Mechanical Integrity Test 0 Location Clearance • Other. (5p tr-5 71" lc 35--G G p 5 i (N' p 5 p /5 2,? Ll/a 5 1 APIC//4✓/DrlVP.M 1cr itt5t ¢o Z5-O0/JS• �11)---ei fr)afe 13k7 'Diet Le-ci,it"f appra ✓eaf pr•r .,7el.�/t-C25-.1 / zl c 1 Spacing Exception Required? ❑Yes u No Subsequent Form Required: `( -- 4 fj 4 ' i° � 7 APPROVED MMI SY / _2 —/S� Approved By: COMMISSIONER THE COMMISSION Date: Form 10-403 Revised 10/012 A r v�a i v dor 12 months from the date of approval Submit In Duplicate VII- 1/23/ 5-`� 1 \ A ,-/j r. zv «— RBDMS c JAN 2 6 2015' /-02.3" Z ' ..01/,1 „...„---f To: Alaska Oil &Gas Conservation Commission R 2' bFi From: Kyle Raese CTD Engineer Date: January 15, 2015 Re: G-16A Sundry Approval Sundry approval is requested to plug the G-16A liner perforations as part of the drilling and completion of the proposed G-16B coiled tubing sidetrack. History and current status: G-16 was originally completed in 1981. A 1988 RWO installed a straddle to isolate the original gas cap perforations. Loss of tubing and production casing integrity necessitated another RWO in 2003 in which a 7" scab liner was run and the tubing was replaced. The well was first sidetracked with CTD in 2009. G-16A was eventually shut-in for high GOR. The well has exhausted wellwork options and has no remaining value and is ready for sidetrack. Proposed plan: G-16B will exit from well G-16A by the Nordic 2 Coiled Tubing Drilling rig on or around March 1, 2015. The G-16B sidetrack will perform a dual-string exit through the existing 3-1/2" tubing and 7" liner. Kick-off will occur in the Sag River formation and target Zone 1B reserves. The proposed sidetrack is a —2,850' horizontal Ivishak Zone 1B producer which will access a —35 acre reserves target southwest of G- Pad. The lateral will be completed with a 2-3/8" L-80 liner which will be cemented and perforated. This Sundry covers plugging the existing G-16A perforations via the G-16B liner cement lob or liner top packer set post-rig (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. S cv c '. , tie Jo weld frodkiCtyw��-y q GOA �v $ --� rhe f e avea"� e c nd f,�ows /,•�-r/r ,' 0A ,/G cam- i y,, "e �'�'r w 4/1 Cry/cd P��1f�r� ,S wa .1°r ce kr- I'm rove' recover/ - -0/0 ®{ rAc 72e31. Pre-Rig Work(scheduled to begin February 1, 2015) 1. E Set 3-1/2" Baker Mono-bore whipstock at-9,375' MD. 2. D Bleed IA&OA to less than 50 psi. 3. V Torque& PT MV, SV, WV. Set TWC. (25 Rig Work(scheduled to begin March 1, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,337 psi). 2. Pull TWC and kill well. 3. Mill 2.80"window and 10' of rathole. 4. Drill build: 3.25" OH, 950' (16 deg DLS planned). 5. Drill lateral: 3.25" OH, 1900' (12 deg DLS planned). 6. Run 2-3/8" L-80 liner leaving TOL at-9,325' MD. 7. Pump primary cement job: 16.7 bbls, 15.3 ppg, TOC at-9,325' MD.* 8. Perform liner cleanout(if necessary) and RPM/GR/CCL log. 9. Perform liner lap test. 10. Perforate -500' liner based on log interpretation. 11. Freeze protect well to 2,500' TVDss. 12. Set TWC; RDMO. Post-Rig Work 1. V Pull TWC. 2. S Set 35 KB liner top packer.*Set generic GLVs. 3. T Test separator. *Approved alternate plug placement per 20 AAC 25.112(i) Kyle Raese CTD Engineer 564-4629 CC: Well File Joe Lastufka TREE= 4-1/16"CNV -VVEIJ_HEAD= aw SAFETY NOTES: WELL ACTUATOR= BAKER C G_16A DOGLEG: 2.2°°@ 9971'A 4--1/2"CHROME TBG•"" MAX KB.ELEV= 77.08' II I BF.ELEV= 41.53' KOP= 3500 H1 2215' H4-1/2"HES X NP,D=3.813" Max Angle= 96`@ 10210' —" 7 i Datum MD= 9831' —#, , ' Datum TVD= 8800'SS ID= T� GAS LFT MANDRELS �// ST MD TVD DEV TYPE VLV LATCH_PORT DATE D 7'BKR LNR TE BACK, =7.50' -1 1993' 3 3286 3285 5 KBG-2 DM' BK 0 05/26/11 9-5/8"X 7'ZXP LTP w/HGR,D=6.276" 2004' N 2 7179 6503 35 KBG-2 DMY BK 0 05/26/11 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8"DV PACKER -1 2585' (A/ IN 8536' H4-1/2"HES X NP,D=3.813" 13-3/8"CSG,72#,N-80,D=12.347" -1 2684' Minimum ID =2.250" @ 9391' 03 8557' H7"X 4-1/2"BKR S-3 FxR D=3.875" 2.70" DEPLOYMENT SLV 8669' -141/2"FES XNIP,D=3.813" 7"LNR,26#,L-80 BTC,.038.3 bpf, D=6.276" H 8678' ik; ji 5-112"TBG,17#,L-80 BTC,.0232 bpf,D=4.892" 8700' 8678' 7"X 5-1/2'XO,D=4.892" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, -{ 8700' > 8700' H4-1/2"HALF MULESHOE,D=3.958" .0152 bpf,D=3.958" Y 4-1/2'SCAB LNR 12.6#,13CR-80 VAM TOP, 8723• Ill 8700' --{5-112"X 4-1/2"XO,D=3.958" .0152 bpf,ID=3.958" .W8712' -�4-1/2"HES X tom,D=3.813" 4-112"TBG CUT(07/10/03) -{ 8735' WI 99 8730' _-J9-518"X 7"UNIQUE MACHME OVERSHOT 8761' H4-1/2"X 7"TBG XO,D=3.958" �� 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" H 8795' 1 �, :',C8761' -19-5/8"x 5-1/2'SBR 13= 8789' H9-5/8"X 4-1/2"OTIS RH FKR D=3.93" TOP OF 7"UR 8853' ,o0 8795' H4-1/2"X 3-1/2"XO,D=2.992" 8853' -19-5/8"X 7"BOT LNR PKR,D= r9-5/8"CSG,47#,L-80,D=8.681" 9347' 17"CRC HOLES N 3-1/2"TBG(CMTD) -I 9494'-9497' _ I Prima 9391' - 12.70"DEPLOYMENT SLV,D=2.250' 3-1/2'TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" --1 9595' =' worri= 9596' H7"X 3-1/2'OTIS HCL PKR D=3.88"? PLOT HOLE WHIPSTOCK(06/11/09) 9750' /r - MILLOUT WINDOW(G-16A) 9750'-9757' [7 LNR 26# L-80, 0383 bpf,D=6.276" --[ -9760 PP TAG(06/12/09) 9755' NI* ` 10120' -I 1.71"FES asp(09/12/09) 7"MARKER JOINT 9771' C •. / PERFORATION SUMMARY a✓a a� / 10199' -1 FORTED SUB REF LOG:BKR HUGHES MM.YGR on 06/14/09 \ \ ANGLE AT TOP PERF:57'a 10000' orix \ \ Note:Refer to Production DB for historical perf data \ \ SIZE SPF INTERVAL ORh'SQZ SHOT SO7 \ .ikim, 'WWI\ILv 1.56" 6 10000-10020 0 09/13/10 "• 1.56' 6 10020-10040 0 09/13/10 PB1D 11461' 2-3/8" SLOT 10329-11462 C 09/13/10 2-3/8"SLOTTED LNR 4.7#,L-80 STL, 11463' D=1.995" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 11/25/14 PJC REFORMATTING WELL: G-16A 02/13/88 Ni ES RWO 12/10/14 CRR/PJC 7'L/'R CGORRECT1ON-C MFD PERMIT No: 2090560 10/05/03 N3ES RWO 12/18/14 WKPIJMJ PULLEDLTP(12/16/14) API Na: 50-029-20643-01 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11N,R13E, 1865'FSL&2277'FWL 06/01/11 DAV/PJC GLV C/O(05/26/11) 01/07/12 GJF/PJC NIPPLE CORRECTIONS BP Exploration(Alaska) glFEAD= C W SALEIY NO I ES: WELL ANGLE>TO°@ '"" MAX ;Tl1ATOR= BAKERC PROPOSAL C',7 -16 B DOGLEG: °@ "°' 4-1/2"CHROME TBG"'" 3.ELEV= - 77.08' ILEI/= 41.53' 2215' -14-1/2"HES X NP,D=3.813" W= 3500' _"CONDUCTOR 7 I L i -. ix Angle= @ tum MD= 9831' #. • � ' itum TVD= 8800'SS ID= " , - GAS LFT MANDRELS ►� ST IAD TVD DEV TYPE VLV LATCH PORT DATE 7"BKR LNR TE BACK,D=7.50' H 1993' 1. ‘1 9-5/8" 3 3286 3285 5 KBG-2 DMY BK 0 05/26/11 9-5/8"X 7'ZXP LTP w/HGR,D=6.276' 2004' ►• 2 7179 6503 35 KBG-2 DMY BK 0 05/26/11 ►f, 1 8467 7620 25 KBG-2 OW BK 0 10/05/02 9-5/8'DV PACKER H 2585' ,moi ► 8536' -141/2"HES X NP,D=3.813" 13-3/8"CSG,72#,N-80,D=12.34r -1 2684' �� Minimum ID = 1.78" @ 10 I la 8557' --17"x 4-1/2-BKRS 3 PKR D=3.875' WIPER PLUG BUSHING IN DEPLOY SLV ; 8669• H41/2"HES xNIP,D=3.613' 7"LNR,26#,L-80 BTC,.038.3 bpf, D=6.276' 1-1 8678' V 104,4 - 5-1/2"TBG,17#,L-80 BTC,.0232 bpf,D=4.892' 8700' 1•' 8678d OP ' 7"X 5-1/2"XO,D=4.892' 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, -8700' 07 8700' H4-1/2"HALF MULESHOE,D=3.958" .0152 bpf,D=3.958" AA L II 8700' -15-1/2"X 4112"XO,D=3.958" 4-1/2"SCAB LM 12.6#,13CR-80 VAM TOP, 8723' '4.V ZI� .0152 bpf,D=3.958" l t� 87-1Y1--14-1/2"HES X NP,D=3.813' 4-1/2"TBG CUT(07/10/03) -I 8735' .‘,N 4st.1,11 8730' 9-5/8'X 7'UNIQUE MACHINE OVERSHOT 8761' -14-1/2'X 7"TBG XO,D=3.958" 8761' H9-5f8"X 5-1/2"SBI,D= " 4-1/2"TBG,12.6#,L-80,.0152 bpi,D=3.958' 8795' N ,7 I.. 8789' 9-5/8'X 4-1/2'OTIS RH PKR,D=3.93' II4 /II IIS III TOP OF 7'LM -1 8853' N �;�I 8795' -141/2'X 3-1/2'XO,D=2.992' I`I 8853'•J-19-5/8'X 7'BOT LNR PKR,D=_" TOP OF 2-3/8"LM (MEWED) ^9325 j ,10444 I'4 -9325 2.70"BKR DEPLOY SLV,D=2.25" Ni '2'`i 1,♦ WI ER PLUG BUSHSIG @_____:,D=1.78" 9-5/8"CSG,47#,L-80 BUTT,D=8.681' -I 9347' 'i_ k ISI 1 '2. Yi l';) MLLOUT WWDOW(G-168) -9375'---9385' 3-1/2'TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992' - -9375 rI 3-1/2"MONOBORE WHIPSTOCK(XX/XX/15) - -9375 ls 4. . 7"LNR,26#,L-80 BUTT,.0383 bpf,D=6.276' -1 -9375 ,► `'x. .. t 4 ;$1/4...., H2-3/8"PUP JOINT w/RA TAl I/, PERFORATION SUMMARY N... ,.> REF LOG: ON XX/XX/15N'.. "..zs' 4 -H PBTD ANGLE AT TOP PERE: '@ �•, Note:Refer to Roduction DB for historical perf data •�•, •_• SEE SPF SITE?/AL OPWSOZ SHOT SQZ 4‘+` . •`•` 4,N. .N• N .#31.4,�I�I 2-3/8' LNR, #,L-80 TI-511, -1 -12225 •Vi .0039 bpf,D=1.995' DATE REV BY COM►BJTS LIATE REV BY COMFITS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 12/17/14 PJC FTALIZEPROPOSAL WELL.: G-16B 02/13/88 Ni ES RWO PERMT No: 10/05/03 N3ES RWO API No: 50-029-20643-02 06/18/09`NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11 N,R13E, 1865'FSL&2277'FW XX/XX/15 NORDIC CTD SIDETRACK(G-16B) 112110/14P C PROPOSAL BUILT BP Exploration(Alaska) 1 1 i I 1 II r1 I w� L' ,.rw . 4 • I E I 1 -ill m 1 mmii 1 .ciam C4 ii — Er I ■g,E'4 • 1 1:1 13 tI 1 ' Y NOM f I 22 :1‘7" I I I 01 to 1 •H I El Y e 1 II i " 1 ., O ,{(, 1 1 u_ ,,..4 I Mil.. Q ) 1 � 2 =J \ I ar. I O oI = 11 I I I F. 2 '_ 1 „ass seg Q f= f "f o 41 I _ �' x as i u 1 1 • • 1 it - - 1''\ 111 R 1 cc F 0 I a� 1 \ I f J I "� F \ !I 1!9u I • W i; MI I�x =� I - Mel my I ii: i o iUU Z%, 2 2 I U _. _ 2kk •• ,' •� U x V E I Ocsi 1 .1 E p \ Z ' 1 I 'x •� r 1�, • e u I ' 1.E i . i 43 V = t . a• ��I:I IMO.Ir 1f; u Q_ . / I 2 o I I _.� f I Ce o ' _ i.1 I U Z f y a I r 1 go I I ,+ =8 f i I =.Ula u n Mill U I '■' E LL g; 14 Iet I kkk®TTT I 21. r'i 411 f la -ibiL I = e - e -6 Z e n 6 1 2 Z Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve / upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on J both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. • ~ Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~,_(~~ - ~~((j Well History File Identifier Organizing (done) ^ Two-sided III Ililil II III II III ^ Rescan Needed III IIIIII II I III III RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. ~ ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ,: /s/ Project Proofing II I II II II V I I I (III BY: Maria Date: ~ /s/ ti P i S x 30 = + =TOTAL PAGES repara on cann ng ~ ~ BY: Maria Date: ~ ~~ ~ ~ C"~ (Count does not include cover sheet) /s/ ~~/ r ~ IIIIIIIIIIIIIIIIIII Production Scanning ice, Stage 1 Page Count from Scanned File: ICJ ~ (Count does include cov sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: q~ ~ ~ (~ /s/ Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. () I II II II I II II I I III ReScanned II (III (I I I I I I I I I I BY: Maria Date: lsl Comments about this file: o~a,.~~e«ed iiuuuiiuuiii P 10/6/2005 Well History File Cover Page.doc • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 Mr. Jim Regg SCANNED AUG 0 7 ao12 Alaska Oil and Gas Conservation Commission sv 333 West 7 Avenue x®/, Anchorage, Alaska 99501 t Subject: Corrosion Inhibitor Treatments of GPB G-Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad G that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, o� Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) G-Pad Date: 03/05/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal G -01A 1931710 50029202140100 3.0 NA 3.0 NA 10.2 5/10/2010 G -028 2081580 50029202170200 0.5 NA 0.5 NA 2.6 5/10/2010 G-03A 1970700 50029202210100 0.7 NA 0.7 NA 6.0 5/27/2010 G-04B 2061400 50029202250200 0.1 NA 0.1 NA 1.7 5/10/2010 G -05 1780970 50029203510000 0.0 NA 0.0 NA 0.0 5/10/2010 G-06A 2060120 50029203580100 0.6 NA 0.6 NA 5.1 5/12/2010 G-07 1790180 50029203590000 0.5 NA 0.5 NA 3.4 5/11/2010 G-08A 2061830 50029205810100 0.1 NA 0.1 NA 0.9 5/27/2010 G-09B 2071100 50029205820200 9.0 NA 9.0 NA 69.7 5/20/2010 G -10C 2060090 50029205530300 0.9 NA 0.9 NA 8.5 3/5/2012 G -11B 2080270 50029205830200 0.0 NA 0.0 NA 0.0 5/21/2010 G -12B 2031410 50029205970200 0.5 NA 0.5 NA 2.6 5/13/2010 G -13A 2001630 50029206000100 0.0 NA 0.0 NA Trace 5/12/2010 G -14B 2090680 50029206460200 0.7 NA 0.7 NA 5.1 5/22/2010 G -15B 2080650 50029206470200 26.0 4.0 0.5 7/16/2011 3.4 7/19/2011 � G -16A 2090560 50029206430100 0.0 NA 0.0 NA Trace 5/22/2010 G -17A 2060760 50029206190100 21.4 4.0 0.6 7/16/2011 3.4 7/19/2011 G -18A 1990320 50029206200100 71.7 14.0 1.0 7/16/2011 8.5 7/19/2011 G -19B 2071240 50029215990200 0.0 NA 0.0 NA Trace 5/22/2010 G -21 1951540 50029226040000 0.5 NA 0.5 NA 3.4 5/12/2010 G -23B 2091440 50029216800200 0.5 NA 0.5 NA 4.3 5/11/2010 G -24A 2060820 50029216710100 0.1 NA 0.1 NA 0.9 5/11/2010 G -25B 2070860 50029216520200 5.3 NA 5.3 NA 23.8 5/28/2010 G -26B 2050480 50029216610200 2.0 NA 2.0 NA 6.8 5/11/2010 G -27A 2070310 50029216460100 0.5 NA 0.5 NA 2.6 5/30/2010 G -298 2101410 50029216500200 2.8 NA 3.0 NA 17.0 5/13/2010 G -30C 2091510 50029216130300 1.0 NA 1.1 NA 5.1 5/30/2010 G-31B 2090310 50029216160200 0.8 NA 0.8 NA 6.0 5/21/2010 G -32A 1970010 50029216360100 0.8 NA 0.8 NA 3.4 5/21/2010 OPERABLE: Producer G -16A (PTD #2.560) Tubing Integrity Restored Page 1 97 Regg, James B (DOA) • From: AK, D &C Well Integrity Coordinator [AKDCWeIllntegrityCoordinator @bp.com] Sent: Friday, May 27, 2011 9:14 AM < 15+Zilit To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Daniel, Ryan; Yeager, Kevin E Cc: Ramsay, Gavin; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) • Subject: OPERABLE: Producer G -16A (PTD #2090560) Tubing Integrity Restored All, Producer G -16A (PTD #2090560) passed a MIT -IA on 5/26/2011 after installing dummy gas lift valves in the well. The passing test confirms two competent barriers and the well is reclassifed as Operable. Please be aware of the risk of annular fluid expansion when placing the well on production as the IA is fluid packed. Thank you, Mehreen Vazir (.A1tevnate: C ;eratri Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells 54,ANNED JUN 0 3. 2011 Well Integrity Office: 907.659.5102 Email: AKDCWeIllntegrityCoordinator @BP.com From: AK, D &C Well Integrity Coordinator Sent: Saturday, May 21, 2011 8:38 AM To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; AK, D &C Well Services Operations Tea ead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Daniel, Ryan Cc: Ramsay, Gavin; Walker, Greg (D &C); Clingingsmith, Mike 3 (Swift) Subject: UNDER EVALUATION: Producer G -16A (PTD #2090560) Sustained Casing Pres are on IA All, Producer G -16A (PTD # 2090560) has confirmed sustained asing pressure on the IA above MOASP. The wellhead pressures were T /I /O = 2400/2350/15 on 5/ 0/2011. The well failed a TIFL on 5/20/2011 confirming TxIA communication. The well has been re assified as Under Evaluation and placed on a 28- day clock. The plan forward is as follows: 1. Slickline: Set DGLVs 2. Fullbore: MIT -IA to 3000 psi, LLR if f., s A TIO plot and wellbore schematic ave been included for reference: « File: G -16A TIO Plot.doc > « File: G- 16A.pdf » 5/27/2011 • U4DER EVALUATION: Producer Gip (PTD #2090560) Sustained Casing,ssure on IA Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIlntegrityCoordinator ©bp.com] 6104 Sent: Saturday, May 21, 2011 8:38 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Daniel, Ryan Cc: Ramsay, Gavin; Walker, Greg (D &C); Clingingsmith, Mike J (Swift) Subject: UNDER EVALUATION: Producer G -16A (PTD #2090560) Sustained Casing Pressure on IA Attachments: G -16A TIO Plot.doc; G- 16A.pdf All, Producer G -16A (PTD # 2090560) has confirmed sustained casing pressure on the IA above MOASP. The wellhead pressures were TWO = 2400/2350/15 on 5/20/2011. The well failed a TIFL on 5/20/2011 confirming TxIA communication. The well has been reclassified as Under Evaluation and laced on a 9 p day clock. The plan forward is as follows: 1. Slickline: Set DGLVs 2. Fullbore: MIT -IA to 3000 psi, LLR if fails MOOED MAY 2 6 201 A TIO plot and welibore schematic have been included for reference: «G -16A TIO Plot.doc» «G- 16A.pdf» Thank you. Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWeIIlntegrityCoordinator @BP.com 5/24/2011 PBU G -16A PTD #2090560 5/21/2011 TIO Pressures Plot Well: G -16 4,000 • 3,000 - —!— Tbg —CIA 2,000 - --- OA OOA 000A On 1,000 • 02/26/11 03/05/11 03/12/11 03/19/11 03/26/11 04/02/11 04/09/11 04/16/11 04/23/11 04/30/11 05/07/11 05/14/11 05/21/11 TREE= CIW 0 SAFETY S: WELL ANGLE > 70° @ 10031'. WELLHEAD = CIW ACTUATOR = BAKER C G -1 6A * 7 ** C 4 17 2 H CHRO ( M CM E T T ) B 9 G 494 - 9497' in 3 TBG. KB. ELEV = 77.08' BF. ELEV = 41.53' 1 I 1993' H r LNR TIEBACK KOP = 3500' 2004' H 7" X 9-5/8 Max Angle = 96° @ 10210' " ZXP LNR PKR, ID = 6.276" I O'll Illq iii Datum MD = 9831 ..= Datum TV D = 8800' SS ST 2215' iv I /2" C Ty ik p m E D0 v x:1P, v i I 13-3/8 CSG, 72#, N-80, 113 = 12.347" H 2684' I 1 PORT DATE I Minimum ID = 1.81" @9384' GAS LIFT MANDRELS 3 3286 3285 5 KBG-2 DOME BK 16 06/27/09 2 7179 6503 35 KBG-2 SO BK 20 06/27/09 1 8467 7620 25 KBG-2 DMY BK 0 10/09/03 3-1/2" KB LTP w/ SEAL ASSY el 11 8536' H4-112" CAMCO X NIP, ID = 3.813" I I 8557' —17" X 4-1/2" BKR S-3 PKR. ID = 3.875" I 8669' H 4-1/2" CAMCO X NIP, ID = 3.813" 1 7" LNR, 26#, L-80, ID = 6.276" I 8678' ' 8678' H7" X 5-1/2" XO, ID = 4.892" I 14-1/2" TBG, 12.64, 13-CR, .0152 bpf, ID = 3.958" I 8700' 8700' J-15-1/2" X 4-1/2" XO, ID = 3.958" I 14-1/2" TOG CUT (07/10/03) I 8735' lir v UNIQUE MACHINE OVERSHOT I ; I 8723' 8711' H 4-1/2" HES X NIP, ID = 3.813" I .4- 0 —I Err, pm 14-1/2" TBG, 12.64, L-80, .0152 bpf, ID = 3.958" I — I 8795 I WI' A I 8789' H 9-5/8" X 4-1/2" OTIS RH PKR, ID = 3.93" I k 4 4 ■ rf v, y ■ 4 8795' H 4-1/2" X 3-1/2" XO I 'TOP OF 7" LNR I 8853' :..... . # 4.; td0 4 144( • 4 /ft 9-5/8" CSG, 474, L-80, ID = 8.681" H 9384'_1-13-1/2" KB LTP w /SEAL ASSY, ID = 1.81" I 0 4 I. • 1 4. 11,41■41 9391' 1-12.70" DEPLOYMENT SLV, ID = 2.250" 1 ...AI 1 1...• ; '4K114 plqi 9596' —17" X 3-1/2" OTIS HCL PKR, ID = 3.88"? I 3-1/2" TOG, 9.34, L-80, .0087 bpf, ID = 2.992" 1 9596' W4 P "I 'PILOT HOLE WHIPSTOCK (06/11/09) 1-1 9750' A Ak *4 MILLOUT WINDOW (G-16A) 9751' - 9757' 1 .4 1 . 'PIP TAG (06/12/09) 1 9755' i t 4 „r1:''.1"="4, , vAiv vAvA 1 111‘ 10120' 1-11.71" HES CIBP (09/12/09) I 10199' I —1 PORTED SUB I a I I II r 1 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 1-1 10195' '-------- - \ PERFORATION SUMMARY \ \ REF LOG: BKR HUGHES MWD/GR on 06/14/09 2-3/8" SOLID LNR, 4.7#, L-80 —1 10329' I \ \ ANGLE AT TOP PERF: 57 @ 10000' STL, .0039 bpf, ID = 1.995" \ \ Note: Refer to Production DB for historical perf data \ \ SIZE SPF INTERVAL OPN/SQZ DATE 1.56" 6 10000 - 10020 0 09/13/10 ,11141,1 PBTD 11461' 1.56" 6 10020 - 10040 0 09/13/10 2-3/8" SLTD 10329 - 11462 CI 09/13/10 2-3/8" SLOTTED LNR, 4.7#, L-80 STL, 11463' ID = 1.995" DATE REV BY COMMENTS DATE , REV BY COMMENTS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 09/23/10 CJS/PJC SET C1BP/PERFS (09/12 - 13/10) WELL: G-16A 02/13/88 NIES RWO 12/03/10 GR/JMD DRLG DRAFT CORRECTIONS PERMIT No: '2090560 10/05/03 N3ES RWO API No: 50-029-2064301--00 06/18/09 NORDICI CTD SIDETRACK (G-16A) SEC 12, T11N, R13E, 1864' FSL & 2277' FWL 06/23/09 PJC DRLG HO CORRECTIONS 06/27/09 DMS/TLH GLV C/O & PERF CORRECTION BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 8/26/2010 Permit to Drill 2090560 Well Name/No. PRUDHOE BAY UNIT G-16A Operator BP EXPLORATION (ALASKIy INC API No. 50-029-20643-01-00 MD 11463 TVD 9048 Completion Date 6/18/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATIDN Types Electric or Other Logs Run: MWD DIR / GR, GR / CL / CNL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / ly mea/rrmi rvumuer Name ~~.a~c n~caa~a rvu awn owN vr~ f~G{iG1YGY Log Neutron 25 Blu 9000 11448 Case 8/10/2009 MCNL, TNN, TNF, GR, CCL 18-Jun-2009 'ED C Lis ~ 18422 'Neutron 8991 11453 Case 8/10/2009 LIS Veri, GR, CNT Plus Graphics pt S Verification LI 9356 11456 Open 9/1/2009 LIS Veri, ROP, GR D C Lis /~ 18462 Tamma Ray 9356 11456 Open 9/1/2009 LIS Veri, ROP, GR Plus Graphics og Gamma Ray 25 Col 9471 11463 Open 9/1/2009 MD GR o Gamma Ray 5 Col 9471 11463 Open 9/1/2009 TVD GR Log Gamma Ray 5 Col 9340 11460 Open 9/1/2009 Depth Shift Monitor Plot D D Asc Directional Survey 37 11463 Open 7/21/2009 pt Directional Survey 9700 11463 Open 7/21/2009 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments •I DATA SUBMITTAL COMPLIANCE REPORT 8/26/2010 Permit to Drill 2090560 WeII Name/No. PRUDHOE BAY UNIT G-16A MD 11463 TVD 9048 ADDITIONAL INFORMATION ll C d? Y We ore Chips Received? -'f'TI~" Analysis 'f"~_ Received? Completion Date 6/18/2009 Operator BP EXPLORATION (ALASKI~ INC API No. 50-029-20643-01-00 Completion Status 1-OIL Current Status 1-OIL UIC N Daily History Received? roll/ N Formation Tops J`~N Comments: Compliance Reviewed By: Date: • M ~/ ~~ BAKER NV6HE5 Baker Atlas PRINT DISTRIBUTION LIST CUMYAN Y BY LXYLUKA'I'lUN (ALASKA)1NC COUNTY NUK'I'H SLUYL BUKOUGH WELL NAME G-16A STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 8/28/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2645025 Copies oC Copies Digital Copies of Copies Digital Each Log of Film Data Each Log oCFilm Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE. AK 99508 ANCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company .Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List Completed Bv: '? r;,® ?; ;~c~ 01 2009 ~~:. _ ~ Oil Gas Cons. Commission Anchorage • Page l of 1 _~~~' ~~ C~ ~ r INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: G-16A ,~ ~~ Contains the following: 1 LDWG Compact Disc _~ (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) '' 1 color print - GR Directional TVD Log (to follow) Sent by: Catrina Gui Date: 08/28/ ~'~~ ~ ~ Received by: ,. Date: S ~~ 0 1 2009 . ~(b!71IS'~u~ Q!~ ~ G~5 C PLEASE ACKNOWLEDGE RECEIPT BY SIGNINGS URNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ ~~~ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 'EQ FAX• (907) 267-6623 il\ ^ . ~ ~ • 07/27/09 ~~ ~~~~~~~~ N0.5324 Alaska Data & Consulting Services Company: State of Alaska 25x_5 Gambeu Street, Suite 40o Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken Ai-fill: Seth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD _____~_ E-36A B1JJ-00018 MCNL ~ •- / 05/18/09 1 ~~_ L2-28 BOCV-00018 RST b - ~ 06/19/09 1 1 12-01 AYTU-00039 RST I ~ 06/02/09 1 1 ~_ R-27 AYOO-00034 RST (p °- .06/17/09 1 1 _,_ F-45B B2NJ-00007 MCNL .- 06/08/09 1 1 _____. 02-33A AYTU-00033 CH EDIT PDC USIT ` 05/19/09 1 1 18-298 AXBD-00023 CH EDIT PDC JEWELRY LOG C. 05/06/09 1 G-16A B2NJ-00010 MCNL 06/18/09 1 1 L3-05 AYTU-00042 RST a- 06/07/09 1 1 Z-01B AXBD-00003 MCNL 11/26/09 1 1 __~ A-04 66NK-00001 RST 07/07/09 1 1 111 FaCC A!`lCP1/l\A/I CPl!`_C n~ n~~nv ev c~~i. ~~~ ~~i. ...w ...~~.........w w-.. w__-. _- _.. __ BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 C. Benson Blvd. Alaska Data & Consulting`Services 2525 Gambeil Street, Suite 400 Anchorage, AK 99503-2838 ~~ ~/~_ BJ-KER HUGHES I I, 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: July 17, 2009 Please find enclosed directional survey data for the following wells: 04-35APB1 04-35A F-45BPB1 F-45B G-16A/ 07-28BPB1 07-28B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~ ~ ,State of Alaska AOGCC DATE: m ~ ~ Cc: State of Alaska, AOGCC 2 ~~- C~5 ~ STATE OF ALASKA ALASKA AND GAS CONSERVATION COM 'SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG IO/E JUL 0 8 2009 t, .: ~ : ~~ C ~s Cans. Commission 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.»o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: Sri ' f8 2 ®DevelopmentExploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 6/18/2009 ° 12. Permit to Drill Number 209-056 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 6/13/2009 ~ 13. API Number 50-029-20643-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 6/15/2009 ~ 14. Well Name and Number: PBU G-16A FEL, SEC. 12, T11 N, R13E, UM 3414 FNL, 3003 Top of Productive Horizon: 4772' FNL, 490' FEL, SEC. 11, T11 N, R13E, UM 8. KB (ft above MSL): 77.1' Ground (ft MSL): 40.08' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 4268' FNL, 4463' FEL, SEC. 12, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD) 11462' 9048' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 657241 y- 5968213 Zone- ASP4 10. Total Depth (MD+TVD) 11463' 9048' 16. Property Designation: ADL 028280 TPI: x- 654504 y_ 5966798 Zone- ASP4 Total Depth: x- 655800 - 5967329 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y 18. Directional Survey ®Yes ^ No Su mi el roni and rin inf rm tin r AA 2 . 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 2098' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information p r 20 AAC 25.0 1): MWD DIR / GR, GR / CCL / CNL ~j//iV~ 0// O 9~S"Dir9Q ~~v?~TYD 22. CASING, LINER AND CEMENTING RECORD . CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT .. WTr PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Condu for Surface 110' Surface 110' 36" 8 cu ds Concr to 13-3 72# L- rf 2684' S rface 84' 17-1/2" 3 21 c rm fr s I 9-5/8" 47# L- 0 Surface 9347' Surface 8422' 12-1/4" 1277 cu ft I s'G' 1 0 cu PF'C' 7" 26# L- 0 8 52' 7968' 8800' 8-1/2" 372 u ft Class'G' 7" x s-1/2" x 4-1/z" 26# / 17#, 12.6# N•80 / L-801 13Cr80 1 7 ' 1 78 N/A 12 7 c I ss ' ' 2-3/8" 4.7# L-80 9384' 11463' 8457' 9048' 3" 28 cu ft Class 'G' & Uncemented Slotted 23. Open to production or inject ion? ®Yes ^ No 24. Tuewc RecoRD If Yes, IISt each interv8l Open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 2-3/8" Slotted Section 4-1/2", 12.6#, 13Cr80 x 9596' 8557', 8789' & 9595' MD TVD MD TVD 3-1/2", 9.3#, L-80 10329' - 11462' 9036' - 904$' 25. ACID, FRACTURE, CEMENT SQUEEZE; ETC. DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 2200' Freeze Protect w/ 33 Bbls of Diesel Z6. PRODUCTION TEST Date First Production: June 30, 2009 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date Of Test: 7/1/2009 HOUrS Tested: 6 PRODUCTION FOR TEST PERIOD OIL-BBL: 869 GAS-MCF: 2,631 WATER-BBL: 17 CHOKE SIZE: 70 GAS-OIL RATIO: 3,029 Flow Tubing Press. 350 CaSing PfeSS: 150 CALCULATED 24-HOUR RATE• OIL-BBL: 3,474 GAS-MCF: 10,522 WATER-BBL: 67 OIL GRAVITY-API (CORK): 26 Z7. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. _.".,~iETtOtd None ~ 6-~' 3 ,, s ~, .~ Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SID ~ ~r L..r.. Z8. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS ` NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 25N 9812' 8859' None 23N 9863' 8908' 22N 9887' 8931' 21 N 9941' 8978' Zone 1 B 10007' 9022' Formation at Total Depth (Name): Zone 1 B 10007' 9022' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. ~ / 7 Signed Terrie Hubble Title Drilling Technologist Date • °?/~`~ PBU G-16A 209-056 Prepared eyName/Number. Terrie Hubble, 564-4628 Well Number P r it No. / A r al No. Drilling Engineer: Greg Sarber, 564-4330 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM ia: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only • BP EXPLORATION Operations Summary Report Page 1 of 9 Legal Well Common W ,Event Nam 'Contractor 'Rig Name: Date Name: ell Name: e: Name: ,From - To G-16 G-16 REENTE NORDIC NORDIC Hours R+COM CALIS 1 Task PLET TA Code E NPT Start Rig Rig Phase Spud Date: 9/24/1981 : 6/1/2009 End: 6/18/2009 Release: 6/19/2009 Number: Description of Operations 6/10/2009 14:30 - 21:00 6.50 MOB P PRE Rig was released from F-456 at 14:30. Move off F-pad to G-16A via Spine road around frontier corner onto G,E,K pad road. Spot rig over well. 21:00 - 00:00 3.00 BOPSU P PRE Accept rig at 21:00 hrs. NU BOP. 6/11/2009 00:00 - 02:00 2.00 BOPSU P PRE Continue nipple up BOPE. Spot Tiger tank and cuttings box. 02:00 - 07:40 5.67 BOPSU P PRE Test BOP. Test witnessing waived by Lou Grimaldi of AOGCC. Valves /Rams tested are Kill line valves on Stack, HCR, Choke manifold valves. 2" Combi, 2-3/8" Combi, Upper 2" Combi, Blind /Shear, Annular, Inner Reel valves, TIW valves. All valves tested OK. 07:40 - 08:50 1.17 BOPSU P PRE Circulate McOH out of reel. Close inner reel valve and PT, good. 08:50 - 09:30 0.67 RIGU P PRE Open inner reel valve, cut off CT connector. M/U CT riser, Pump cable backwards. 09:30 - 09:45 0.25 RIGU P PRE SAFETY MEETING. PJSM for cutting CT. Overhead loads and sharp edges were discussed. 09:45 - 12:00 2.25 RIGU P PRE Cut 319 ft of CT to find cable. Test cable then Install CT connector. 12:00 - 12:15 0.25 CLEAN P WEXIT SAFETY MEETING. PJSM for picking up BHA #1. 12:15 - 13:00 0.75 CLEAN P WEXIT M/U BHA #1 - 2.79" D331 mill, 1.1 Deg Motor, 2-3/8" CoilTrak. 13:00 - 15:40 2.67 CLEAN P WEXIT RIH. Log GR down from 9470 ft. Correct -6.5 ft. Continue RIH. 15:40 - 16:30 0.83 CLEAN P WEXIT Tag at 9620 ft. Up wt is 35 Klbs. Hold 160E and drill pilot hole in cement. Tag 9621 ft, stall twice here. Drill past 9625 ft at 50-60 ft/hr, 0 K on DWOB. 9640 ft 125 ft/hr 0.09 Klbs DWOB 9650 ft 150 ft/hr 0 Klbs DWOB 9660 ft 152 Whr 0 Klbs 9670 ft 150 Whr 0 Klbs 16:30 - 16:50 0.33 CLEAN P WEXIT Short wiper back to 9550 ft. 16:50 - 17:20 0.50 CLEAN P WEXIT Drill from 9670 ft at 160L. 9680 ft 145 ft/hr 0.04 Klbs 9690 ft 145 ff/hr 0.06 Klbs Stall at 9694 ft, 2 times. 9700 ft 36 ft/hr 1.61 Klbs 9710 ft 147 fUhr 0.20 Klbs 17:20 - 20:30 3.17 CLEAN P WEXIT Wiper from 9713 ft to move end stops. 9720 ft 148 ft/h 0.03 Klbs Stall at 9727 ft. 9730 ft 109 ft/hr 0.66 Klbs Stall here. Stall at 9734 ft. 9740 ft 96 ft/hr 0.06 Klbs Stall three times at 9741 ft 9742 ft 14 fUhr 0.24 Klbs Stall at 9742', Twice at 9742.4' 9744 ft 12 Whr 0.09 Klbs 9746 ft 20 Whr 0.24 Klbs Stall at 9746.3', 9747', 9747.9' Printed: 6/29/2009 3:05:08 PM • BP EXPLORATION Operations Summary Report Legal Well Name: G-16 Common Well Name: G-16 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT 6/11/2009 17:20 - 20:30 3.17 CLEAN P Start: 6/1 /2009 Rig Release: 6/19/2009 Rig Number: I Page 2 of 9 ~ Spud Date: 9/24/1981 End: 6/18/2009 Phase ~ Description of Operations - - - - _ __ WEXIT 9748 ft 11 ft/hr 0.08 Klbs 20:30 - 22:15 I 1.751 CLEAN I P I I WEXIT 22:15 - 22:50 0.581 CLEAN P W EXIT 22:50 - 00:00 1.17 CLEAN P WEXIT 6/12/2009 00:00 - 00:25 0.42 CLEAN P WEXIT 00:25 - 00:35 0.17 CLEAN P WEXIT 00:35 - 01:10 I 0.581 CLEAN I P I I W EXIT 01:10 - 02:25 I 1.25 I CLEAN I P I I W EXIT 02:25 - 02:35 0.17 CLEAN P WEXIT 02:35 - 03:20 0.75 CLEAN P WEXIT 03:20 - 04:10 0.83 CLEAN P WEXIT 04:10 - 04:20 0.17 CLEAN P WEXIT 04:20 - 06:45 2.421 CLEAN P WEXIT 06:45 - 07:00 0.25 CLEAN P W EXIT 07:00 - 07:30 0.50 CLEAN P WEXIT 07:30 - 07:45 0.25 STWHIP N WAIT WEXIT 07:45 - 08:15 0.50 STWHIP P WEXIT 08:15 - 10:30 2.25 STWHIP N SFAL WEXIT 10:30 - 11:15 0.75 STWHIP P WEXIT 11:15 - 15:00 3.751 STWHIP P I WEXIT 9750 ft 9 fUhr 1.09 Klbs 9754 ft 8 fUhr 1.14 Klbs 9758 ft 7 fUhr 2.04 Klbs 9760 ft 7 ft/hr 1.38 Klbs 9764 ft 7 fUhr 1.05 Klbs 9767 ft 19 ft/hr 1.97 Klbs 9770 ft 19 ft/hr 1.83 Klbs 9776 ft 19 fUhr 1.95 Klbs 9780 ft 19 ft/hr 1.95 Klbs Pump high-vis pill down to bit and clean out while PUH. Roll TF over to HS (0 deg) at 9640' and slow down to 5 fpm to 9620' POH with 2.80" pilot assembly. Circ 1.52, 2292 psi. POH with 2.80" Pilot assy. Tag up at surface SAFETY MEETING. PJSM for laying down BHA #1 and picking up dummy WS. Unstab injector and CT. Lift up BHA and break off and laydown MTR and 2.80" mill. (2.79 GO, 2.78 NO-GO) M/U Dummy WS drift to INTEQ BHA and RIH. Stab on CT and Injector. M/U riser. Begin RIH. SLB notes that stick will not operate. Can still drive injector while holding override button. Notify SLB electricians, dispatched to rig. Continue to RIH while waiting on SLB electricians. Discussed monitoring weight indicators and hydraulic pressures until problem is corrected. SLB Electricians on site. Stop RIH for initial diagnostics. Resume RIH while SLB troubleshoots. Determine faulty fuse is root cause. Repaired and dismiss SLB electricians. Log GR tie in down from 9470', -15' correction Cont. RIH 0.6 bpm, 1011 psi. Slight bobble at 9741 Tag TD at 9780.5' POH with dummy WS assy Circ. 1.49 bpm, 1838 psi. SAFETY MEETING. PJSM for change out BHA. Crew positions and new personnel were discussed. UD BHA #2 Drift assembly. Wait on SLB wireline to install RA tags. Run BHA #3 -Whipstock with no fish neck, 2-3/8" CoilTrak into stack and standby. Wait on SLB injector control repair. M/U BHA #3 and test at surface. Open EDC. RIH. Stop at 805 ft and fix BHI counter, then continue RIH. Depth encoder wheel appears to be slipping. Stop at 2786 ft and change out counter assembly. Continue RIH. Log GR down from 9480 ft. Correct +56 ft. Log GR down from 9680 ft to confirm correction. Correct -0.5 Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Page 3 of 9 Operations Summary Report Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLETE Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task ', Code NPT Phase Description of Operations 6/12/2009 11:15 - 15:00 3.75 STWHIP P WEXIT ft. 15:00 - 15:15 0.25 STWHIP P WEXIT Orient to 180L. 15:15 - 17:05 I 1.831 STWHIPI P 17:05 - 17:15 0.17 STWHIP P 17:15 - 18:00 0.75 STWHIP P 18:00 - 18:15 I 0.251 STWHIPI P 18:15 - 18:35 I 0.331 STWHIPI P 18:35 - 18:50 0.25 STWHIP P 18:50 - 21:15 2.42 STWHIP P 6/13/2009 100:00 - 03:35 3.581 STWHIP P 03:35 - 04:45 1.17 STWHIP P 04:45 - 05:20 0.58 STWHIP P 05:20 - 07:00 1.67 STWHIP P 07:00 - 07:15 0.25 STWHIP P 07:15-08:00 ~ 0.75~STWHIP~P RIH to whipstock setting depth of 9758.7 ft, which puts TOWS at 9750.0 ft. PIP tag 5.3' below TOWS at 9755.3'. Close EDC. Pressure up slowly, maintain TF at 180L. Setting tool shears at 3800 psi. Set down 1 K for 1 min and bleed off CT pressure. WEXIT POOH. i Whipstock is set at 9750 ft TOWS at 180E TF. WEXIT SAFETY MEETING. PJSM to discuss change out BHA. WEXIT Tag stripper and L/D whipstock setting tools. Tool has functioned normally. Start P/U window milling BHA #4 - 2.74" Diamond String Mill, 2.74" Diamond String Reamer, 2-1/8" Xtreme motor, 2-5/8" Ribbed Centralizer, 2 jts 2.06" CSH, 2-3/8" CoilTrak. WEXIT SAFTEY MEETING. PJSM with night crew. Discussed picking up coiltrack tools and stabbing on injector. WEXIT Finish testing coiltrack tools on catwalk. Finish picking up 2-3/8" CoilTrak. FINAL BHA #4 OAL = 110.16". WEXIT Stab on injector. WEXIT Begin RIH while SLB continues to troubleshoot control panel. SLB control panel fixed Log GR tie in at 9540' (-1 ft correction) WEXIT Tag pinch point dry at 9750.4' Establish FS 2440 psi at 1.61 bpm. 21:50 / 9750.5 / 0.18 k WOB 22:20 / 9751.0 / 0.15 K WOB Bottoms up shows metal on the magnets 22:54/9751.5/0.21K WOB 23:20 / 9752.0 / 0.79K WOB 23:40 / 9752.5 / 1.35K WOB WEXIT Cont. window milling... 00:21 / 9753.0' / 1.99K WOB 00:48 / 9753.5' / 1.84K WOB 02:00 / 9754.0' / 1.62K WOB (2% Sand/Chert/Quartz) 02:30 / 9754.5' / 1.74K WOB 03:00 / 9755.0' / 1.83K WOB 03:24 Stall at 9755.3' Pick up, Set down, Stall again at 9755.4' (appears to be bottom of window) WEXIT Drill ahead and make 10' of rathole to 9765.5' WEXIT Backream up through window twice Dry drift window clean WEXIT POOH WEXIT SAFETY MEETING. PJSM to discuss hazards and mitigations to change out BHA and jet stack. WEXIT Tag stripper and L/D BHA #4. Mill is 2.72" no-go, String reamer is 2.73" no-go. Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Operations. Summary Report Page 4 of 9 ~ Legal Well Name: 'Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To G-16 G-16 REENTER+COM NORDIC CALIST NORDIC 1 Hours ' Task PLET A Code E NPT Start Rig Rig Phase Spud Date: 9/24/1981 : 6/1 /2009 End: 6/18/2009 Release: 6/19/2009 Number: Description of Operations 6/13/2009 08:00 - 09:10 1.17 STWHIP P WEXIT M/U swizzle stick and jet stack. Flush choke manifold also. 09:10 - 09:55 0.75 STWHIP P WEXIT M/U BHA #5 -HCC Bicenter, 2.5 deg Xtreme, 2-3/8" CoilTrak. BHA OAL = 58.4 ft. 09:55 - 13:30 3.58 STWHIP P WEXIT RIH BHA #5. Log GR down from 9375 ft to 9520 ft. Correct -5 ft. 13:30 - 17:50 4.33 STWHIP P WEXIT Pass thorugh window on 1st attempt at 180L. Tag bottom at 9766 ft, drill from there. Start Geo-Vis mud system down the CT. Drill at 1.58 / 1.60 bpm ~ 2100-2500 psi. ROP is 20-30 ft/hr with 2-3 Klbs DWOB, later increasing to 60-90 ft/hr. Drill to 9900 ft. 17:50 - 18:10 0.33 STWHIP P WEXIT Wiper trip from 9900 ft to window. 18:10 - 22:05 3.92 STWHIP P WEXIT Drill ahead from 9900' FS 2100psi C~3 1.57 bpm 9910', 65-70' ft/hr, 1.60 bpm / 1.63 bpm, 2574 psi, 2.88 K DHWOB Several stalls starting at 9935' 9950', 50fUhr, 1.61 bpm / 1.63 bpm, 2350 psi, 2.45 K DHWOB 10,050', 40-80 fUhr, 1.60 bpm / 1.61 bpm, 2535 psi, 2.75k BHWOB 22:05 - 23:20 1.25 STWHIP P WEXIT Wiper trip from 10,050' to window and circ btms up to catch sample as per Geo. 23:20 - 00:00 0.67 STWHIP P WEXIT Attempt to drill ahead from 10,050' Cannot get any motor work when setting down on bottom Make -5' of progress with multiple PU and set downs and change TF but no MW. POOH to check BHA 6/14/2009 100:00 - 02:10 I 2.171 DRILL I P I I PROD1 02:10 - 02:20 0.17 DRILL P PROD1 02:20 - 02:30 0.17 DRILL P PROD1 02:30 - 04:30 2.00 DRILL P PROD1 04:30 - 05:00 ( 0.50 ~ DRILL i P ~ ~ PROD1 05:00 - 07:20 ~ 2.33 ~ DRILL ~ P ~ ~ PROD1 07:20 - 07:40 0.33 DRILL P PROD1 07:40 - 11:50 4.17 DRILL P PROD1 Open EDC at 9607'. Pump at 2.0 bpm, 2100 psi. Close EDC at 400' and tag up at surface SAFETY MEETING. Review proper BHA handling procedures and discuss using pipe cutter. Unstab infector and laydown BHA #5. Bit graded 4,2,BT,A,X,I,CT,PR. Bit was begining to ring out on nose. Cut 99.7' of pipe as per SLB chrome management. Test eline and install CTC. Pull test to 35K, pass. Presure test, pass Install UOC. PU BHA #6 -Rebuild HCC Bicenter, 1.5 deg Xtreme, 2-3/8" CoilTrak. BHA OAL = 58.4 ft. Stab on injector and M/U riser. Begin RIH. Pass through window at 180L, log GR down from 9770 ft. Correct -2.5 ft. Continue RIH. Motor work seen at 9930 and 10000 ft, with correct orientation. Drill from 10057 ft. Hold OL TF to build angle to 95 deg. Target TVD is now 8960 ft. ROP is 20-50 ft/hr with 1-3 Klbs DWOB. 1.62 / 1.64 bpm ~ 2100-2400 psi. PVT = 292 bbls. Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Page 5 of 9 Operations Summary Report i Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLETE Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations 6/14/2009 07:40 - 11:50 4.17 DRILL P PROD1 Drill to 10200 ft. 11:50 - 12:30 0.67 DRILL P PROD1 Wiper trip from 10200 ft to window. Clean pass up and down. 12:30 - 15:15 2.75 DRILL P PROD1 Drill from 10,200 ft. Continue to hold 95 deg inc up to 8960 ft ' 5:15 - 16:00 16:00 - 17:30 .75 1.50 RILL DRILL P P ROD1 PROD1 TVD. 1.62 / 1.65 bpm @ 2000-2400 psi. PVT = 292 bbls. ROP around 60 ft/hr with 1 Klbs DWOB. After 10300 ft ROP goes to 70-80 ft/hr. Drill to 10,350 ft. Wiper trip from 10350 ft to window. Drill from 10350 ft. Level off at 8957 ft TVD then hold 90 de _ inc, for now. 1.57 / 1.58 bpm C~3 2100-2400 psi. ROP is 80-100 ft/hr with 1.3 Klbs DWOB. PVT = 284 bbls, In /Out = 8.56 / 8.70 ppg with ECD = 9.47 PPg• Drill to 10500 ft. 17:30 - 18:45 1.25 DRILL P PROD1 Wiper trip to window and tie-in log. Correct +2 ft. 18:45 - 21:25 2.67 DRILL P PROD1 Drill from 10500 ft. Holding 90 deg inc. 1.58 / 1.61 bpm C~3 2400-2600 psi. ROP is 90-100 Whr with 1.75 Klbs DWOB. PVT = 279 bbls, In /Out = 8.58 / 8.68 ppg with ECD = 9.51 PPg• ROP dropped to 60 fph at 10,620' Drill to 10650 ft. 21:25 - 22:25 1.00 DRILL P PRODi Wiper trip from 10,650' to window. 22:25 - 00:00 1.58 DRILL P PROD1 Drill from 10650 ft. FS = 2260 psi 1.63 / 1.66 bpm ~ 2500-2700 psi. ROP is 50-100 ft/hr with 1.35 Klbs DWOB. PVT = 275 bbls, In /Out = 8.59 / 8.70 ppg with ECD = 9.55 PPg• Drill to 10790 ft. 6/15/2009 00:00 - 00:10 0.17 DRILL P PROD1 Continue drlling to 10,800' 00:10 - 01:20 1.17 DRILL P PROD1 Wiper from 10,800' to window. 01:20 - 02:55 1.58 DRILL P PROD1 Drill from 10800 ft. 1.64 / 1.66 bpm Q 2400-2600 psi. ROP is 60-100 ft/hr with 1.55 Klbs DWOB. PVT = 265 bbls, In /Out = 8.59 / 8.74 ppg with ECD = 9.60 PPg• Drill to 10950 ft. 02:55 - 04:25 1.50 DRILL P PROD1 Wiper from 10,950' to window. Log tie in, +2 ft correction. 04:25 - 06:15 1.83 DRILL P PROD1 Drill from 10950 ft. 1.64 / 1.66 bpm (~3 2500-2600 psi. ROP is -100 ft/hr with 1.22 Klbs DWOB. PVT = 263 bbls, In /Out = 8.62 / 8.71 ppg with ECD = 9.61 PPg• Drill to 11056 ft. 06:15 - 07:00 0.75 DRILL P PROD1 Pull a short wiper while new mud system is readied for downhole. 07:00 - 08:15 1.25 DRILL P PROD1 Drill from 11056 ft. Start new mud downhole. Slow ROPs from 11040 ft onwards. CT Pressure spikes off bottom with no accompanying annular Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Operations Summary Report Page 6 of 9 ~ Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLETE Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 ~~ Rig Name: NORDIC 1 Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations --__ - - _ 6/15/2009 07:00 - 08:15 1.25 DRILL P PROD1 pressure increase, bit may be plugging. 08:15 - 10:30 2.25 DRILL P PROD1 Drill to 11,085 ft. ROP and slidin has deteriorated. POOH for bit /motor change and and addition of Agitator. Rubber is seen across shaker screens. 10:30 - 10:45 0.25 DRILL P PROD1 SAFETY MEETING. PJSM for change out BHA. 10:45 - 11:50 1.08 DRILL P PROD1 Tag stripper and L/D BHA #5. Bit comes out 2-2 with 4 of 5 lu ed 'ets. M/U BHA #7 - HYC SRX bit with 1.1 deg motor, Agitator and 2-3/8" CoilTrak. BHA OAL = 66.27 ft. 11:50 - 14:40 2.83 DRILL P PROD1 RIH. Surface test of agitator is good. Pass through window at 180E and log GR down from 9770 ft. Correct -5.5 ft. Continue RIH, trouble passing shales from 11,030 ft onwards. 14:40 - 15:20 0.67 DRILL P PROD1 T to ass throu h shales with various um rates not able to. Ream back to bottom at 6 ft/min with as-drilled TF. 15:20 - 15:45 0.42 DRILL P PRODi Reach TD and Backream to above shale zone. Ream back down to bottom. 15:45 - 18:10 2.42 DRILL P PROD1 Tag at 11082 ft and drill. Hold 180E TF to try and get out of u I shale zone. 1.60 / 1.59 bpm ~ 2350-2900 psi. ECD = 9.22 ppg. ROP is 10-80 ft/hr with 1-4 Klbs DWOB. After 11110 ROP is around 80 ft/hr. PVT = 306 bbls. Drill to 11,250' 18:10 - 19:40 1.50 DRILL P PROD1 Wiper trip to window from 11,250' Tagged shale (~ 10,050', 10,650', & 11,090' while RIH 19:40 - 21:25 1.75 DRILL P PROD1 Drill from 11250 ft. Had to bring rate over 1.7 on btm to get agitator working. 1.71 / 1.72 bpm C~ 2800-2900 psi. ROP is 80-110 fUhr with 1.36 Klbs DWOB. PVT = 292 bbls, In /Out = 8.50 / 8.60. ppg with ECD = 9.34 PP9• Drill to 11400 ft. 21:25 - 22:45 1.33 DRILL P PROD1 Wiper trip to window from 11,400' 22:45 - 23:10 0.42 DRILL P PROD1 ~ ril from 11400 ft. 1.71 / 1.72 bpm C~ 3000-3200 psi. ROP is 80-110 fUhr with 1.36 Klbs DWOB. PVT = 292 bbls, In /Out = 8.50 / 8.60 ppg with ECD = 9.34 Ppg• Drill to 11457 ft. Called TD as er Geo. 23:10 - 00:00 0.83 DRILL P PROD1 Wiper back to window from 11,457' 6/16/2009 00:00 - 00:20 0.33 DRILL P PROD1 Pull above top of pilot cement at 9620' and circulate for 5 min. INMM 1.66 b m / OUTMM 1.66 b m Go for Bonsai Com letion! 00:20 - 00:40 0.33 DRILL P PROD1 Log tie in to PIP tag. (+ 7' correction) 00:40 - 01:28 0.80 DRILL P PROD1 RIH, set down at 11,042' pick up and run through. Tag bottom at 11,463' corrected depth. 01:28 - 04:15 2.78 DRILL P PROD1 P H laying in liner pill. Open EDC after pulling in 3-1/2" Paint flag at 7333.7 EOP Tag up at surface. Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Page 7 of 9 Operations Summary Report Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLETE Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase '~ Description of Operations 6/16/2009 04:15 - 04:25 0.17 DRILL P PROD1 SAFETY MEETING. PJSM discussed standing back injector, BHA handling, and pumping slack/cutting slack. 04:25 - 05:30 1.08 DRILL P PRODi Unstab injector and stand back. Lay down BHA #7, bit graded 1,1,DT,A,X,I,TD Pick up 1 jt of 2-1/16" CSH and stab injector on well. 05:30 - 06:20 0.83 DRILL P PROD1 Pump slack forward, pop off well. Cut 237 ft of cable. 06:20 - 06:50 0.50 CASE P RUNPRD Install CT connector, pull test to 35 Klbs. PT to 3500 psi, good. 06:50 - 07:05 0.25 CASE P RUNPRD SAFETY MEETING. PJSM to discuss picking up liner. Well control and unusual liner configuration were discussed. 07:05 - 10:45 3.67 CASE P RUNPRD Run Bansai completion string as per program: ` 2-3/8" Guide Shoe 2-3/8", 4.70", L-80, STL Solid Liner with turbos e Plate Sub with ports -Spaced out at 10,199 ft. 2 jts 2-3/8", 4.70", L-80, STL Pup Baker O-ring sub 24 its 2-3/8". 4.70". L-80. STL Solid Liner 2-3/8" STL Pup BTT Deployment Sleeve, with 3" GS profile, TOL at 9391 ft. LBRT XO Swivel 3/4" Disconnect XO 2.06 CS Box x 1-1/2 MT Pin 4 jts 2.06" CSH XO Quick Connect CT Connector Inner String: Slick Joint 1 " CSH + Pup jts for spaceout Extra 1" CSH below ball seat 5/8" Ball Seat LBRT BHA OAL = 2205.40 ft 10:45 - 12:25 1.67 CASE P RUNPRD Run 1"Slick Joint + 1"CSH inside of 2-3/8" Liner. 12:25 - 12:50 0.42 CASE P RUNPRD MU swivel to coil, PU injector head & MU to BHA 12:50 - 14:45 1.92 CASE P RUNPRD RIH with Bonzai liner Assy. Wt. check 9590' C~ 36k RIH to 11372 uncorrected Ta u set -10K U wt 36K. 14:45 - 15:15 0.50 CASE P RUNPRD Launch 5/8" stl ball with 500 psi. Circulate ball 1.53 bpm ~ 2050 psi. Ball on seat with 27.6 bbls shear seat with 2300 psi. PU WT 30K 15:15 - 18:00 2.75 CASE P RUNPRD Swap well to KCL 18:00 - 18:45 0.75 CEMT P RUNPRD PJSM for cementin liner. 18:45 - 19:30 0.75 CEMT P RUNPRD Flood cementers with KCL. Batch mix cement. PT cement line to 6000 psi. OK. 19:30 - 22:30 3.00 CEMT P RUNPRD Pump 5 bbl cement 1.5 bpm @ 1500-2800 psi. Printed: 6/29/2009 3:05:08 PM BP EXPLORATION Page 8 of 9 Operations Summary Report Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLETE Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 Rig Name: NORDIC 1 Rig Number: Date From - To 'Hours Task Code ~ NPT Phase Description of Operations 6/16/2009 19:30 - 22:30 3.00 CEMT P RUNPRD Isolate CT and pump Bio to cementers. Displace cement with 2# bio C~3 1.8 bpm. At 36.7 bbl reduce rate to 0.5 bpm 510 psi. Pump 4 bbls. Pull out O ring sub. Lay in 1 bbl cement. Pull above cement to 11,000'. RIH contaminating cement pumping 0.5 bpm. POH pumping 6/17/2009 22:30 - 22:50 22:50 - 00:00 00:00 - 00:30 00:30 - 01:30 01:30 - 01:45 01:45 - 04:40 04:40 - 08:40 08:40 - 09:20 0.33 1.17 0.50 1.00 0.25 2.92 4.00 0.67 CEMT CEMT CEMT CEMT CEMT CEMT CEMT CEMT P P P P P P P P RUNPRD RUNPRD RUNPRD RUNPRD RUNPRD RUNPRD RUNPRD RUNPRD SAFETY MEETING, re: UD LRT and CSH. UD 4 jts 2-1/16" CSH, LRT, and 12 stds 1" CSH. Finish UD 1"CSH. Pull test pad eyes on derrick prior to windwall removal and lubricate rig. SAFETY MEETING, re: PU Cleanout BHA PU Cleanout BHA with 2 jnts of 2-1/16" CSH and 20 stands of 1~H RIH to O ring sub .Circulate bottom up lots of contaminated cement. PU to liner top while circulating. Test liner lap to 2000 psi for 30 min. Lost 500 psi in 10 minutes. Test FAILED. 09:20 - 09:50 0.50 CEMT P RUNPRD RIH to O Ring sub. 10179 un corrected. 09:50 - 14:20 4.50 CEMT P RUNPRD Mill O ring sub 1.3 bpm ~ 2220 psi. FS 2000 psi.Pump sweep. RIH to 10202. Mill Float ~ 1.3 bpm and 2190 - 2350 psi. Mill thru baffle plate. Cement in returns. 14:20 - 14:30 0.17 CEMT P RUNPRD RIH to 10500. ump sweep. 14:30 - 17:35 3.08 CEMT P RUNPRD POH to 10080. Drop 1/2" stl ball and launch with 1800 psi & displace with 10 bbl Hi vis pill. 1.5 bpm @ 3700 psi. Ball on seat 29.5 bbls. shear at 4100 psi. POH 1.75 bpm ~ 3060 psi. 17:35 - 18:00 0.42 CEMT P RUNPRD PJSM then standback injector. 18:00 - 18:20 0.33 CEMT P RUNPRD Crew change. SAFETY MEETING, re: UD ceanout BHA. 18:20 - 20:10 1.83 CEMT P RUNPRD UD 2 jts 2-1/16" CSH, 40 jts 1"CSH, and remaining Cleanout BHA 20:10 - 20:30 0.33 BOPSU P LOW ER1 FUNCTION TEST BOPE: Lower 2" Combit, 2-3/8" Combi, Upper 2" Combit, B/S Rams, Annular Preventer, & HCR valve. 20:30 - 21:30 1.00 BOPSU P LOWERI PJSM then jet the stack. 21:30 - 21:50 0.33 EVAL P LOWERI SAFETY MEETING, re: PU logging BHA 21:50 - 00:00 2.17 EVAL P LOWERi Lift Logging tools to rig floor MU logging tools & install source PU 35 stds 1" CSH & 2 jnts 2-1/16" CSH 6/18/2009 00:00 - 01:00 1.00 EVAL P LOWERi Finish PU Logging BHA 01:00 - 02:15 1.25 EVAL P LOWERi RIH Lo in BHA 02:15 - 03:40 1.42 EVAL P LOWERI Log down from 9000' at 30 fpm. Tag PBTD at 11461' uncorrected. 03:40 - 04:30 0.83 EVAL P LOWERI Lo u from PBTD at 60 f m to 9000'. 04:30 - 06:15 1.75 EVAL P LOWERI POOH 06:15 - 06:30 0.25 EVAL P LOWERI PJSM for LD BHA and CSH. 06:30 - 08:00 1.50 EVAL P LOWERI LD BHA. 08:00 - 09:00 1.00 CASE P RUNPRD LD balance of 1" CSH stood back in derrick.. 09:00 - 09:40 0.67 CASE P RUNPRD MU liner top packer assy and BHA. 09:40 - 11:35 1.92 CASE P RUNPRD RIH to 9250. Up Wt 29K Dn Wt 15K. Tag at 9401. At .45 BPM seen pressure rise and lost 11:35 - 11:45 0.17 CASE P RUNPRD Test liner lap to 2000 nsi Lost 500 psi ir, 3 min Faileri tntact_ 11:45 - 13:00 1.25 CASE P RUNPRD PU to 9364'. Drop 5/8" stl ball and launch with 2000 psi and Printed: 6/29/2009 3:05:08 PM ~ ~ BP EXPLORATION Page 9 of 9 Operations Summary Report Legal Well Name: G-16 Common Well Name: G-16 Spud Date: 9/24/1981 Event Name: REENTER+COMPLET E Start: 6/1/2009 End: 6/18/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/19/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 6/18/2009 11:45 - 13:00 1.25 CASE P RUNPRD displace 1.8 bpm ~ 1230 psi. Ball on seat with 25.7 bbls. RIH tag at 9401 pu toup wt -1 ft. Pressure to 2000 psi. Set down to 9398. OK Pressure to 2800 to shear released. 13:00 - 14:40 1.67 CASE P RUNPRD POH 14:40 - 15:10 0.50 WHSUR P POST MU BHA for freeze protection. 15:10 - 16:00 0.83 WHSUR P POST RIH to 2200' Lay in 33bb1 diesel. 16:00 - 16:30 0.50 WHSUR P POST Flow check & Set BPV 16:30 - 17:20 0.83 WHSUR P POST Pump 5 bbl H2O and inhibitor treatment 17:20 - 17:35 0.25 WHSUR P POST PJSM for N2 blow down. 17:35 - 18:30 0.92 WHSUR P POST Blow down reel with N2 18:30 - 18:45 0.25 WHSUR P POST SAFETY MEETING, re: Pulling coil across & securing to the reel. 18:45 - 22:15 3.50 WHSUR P POST Install grapple, pull coil across & secure to the reel, RD reel hardline, & unload reel. SIM OPS--PJSM, Change rams on BOPs 22:15 - 00:00 1.75 WHSUR P POST PJSM, ND BOPs. NU & PT Tree Cap PJSM to back off of the well. MIDNIGHT Move to DS 07-286. RELEASE = 8 days 3 hours Printed: 6/29/2009 3:05:08 PM i ~~~~ BAKER H~I~IE'~i~ INTEQ North America Prudhoe Bay PB G Pad G-16 -Slot 16 - ALASKA - BP G-16A Design: G-16A Survey Report -Geographic 16 June, 2009 by ~Lt ~s • Survey Report -Geographic a.. , ~.,~ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB G Pad Well: G-16 .Wellbore: G-16A Design: G-16A Local Go-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculattan Method: Database: Well G-16 -Slot 16 Mean Sea Level 23:16 8/24/1981 00:00 @ 77.10ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P project Prudhoe Bay, North Slope, UNITED STATES Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic state factor Site PB G Pad TR-11-13 Site Position: Northing: 5,966,832.87ft Latitude: 70° 18' 58.211 N From: Map Easting: 656,301.39ft Longitude: 148° 43' 59.013 W Position Uncertainty: 0.00 ft Slot Radius: O.000in Grid Convergence: 1.19 ° Well G-16 API No 500292064300 Well Position +N/-S 0.00 ft Northing: 5,968,213.00 ft Latitude: 70° 19' 11.590 N +E/-W 0.00 ft Easting: 657,241.00 ft Longitude: 148° 43' 30.759 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft Wellbore G-16A API No 500292064301 Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2008 4/27/2009 22.73 80.93 57,707 Design G-16A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,700.00 Vertical Section: Depth From (TVD) ; +N/-S +E/-W Direction (~) (~) (ft) (°) -40.08 0.00 0.00 239.66 ~, Survey Program Date: 6/16/2009 ~'i From To i (ft) (ft) Survey (Wellbore) Toot Name Description 100.00 9, 700.00 1 : Sperry-Sun BOSS gyro multi (G-16) BOSS-GYR O Sperry-Sun BOSS gyro multishot ', 9,751.20 11 ,463.00 MWD (G-16A) MWD MWD -Standard 6/16/2009 9:35:34AM Page 2 COMPASS 2003.16 Build 70 B/l ~R•' ~~~ • Survey Report -Geographic • 1NTEQ Company: North America -ALASKA - BP Loca( Go-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Well: G-16 North Reference: True Wellbore: G-16A Survey Calculation Method: Minimum Curvature Design: G-16A Database:- EDM .16 - Anc Prod - WH24P Survey Measured TVD Below Depth Inclination Azimuth System +N!-S (nl (°) (°) (ft) (ft) 9,700.00 TIP 9,751.20 KOP 9,790.47 9,819.89 9,849.73 9,880.57 9,910.23 9,940.15 9,970.57 10,000.11 10,031.33 10,059.59 10,089.83 10,119.83 10,149.73 10,180.11 10,209.69 10,240.21 10,270.75 10,300.85 10,334.37 10,363.25 10, 392.51 10,423.09 10,453.61 10,484.62 10,515.86 10,545.90 10, 575.54 10,604.98 10,635.52 10,665.58 10,697.26 10,728.76 10, 760.96 10,790.60 10,821.74 10,850.18 10,880.64 10,910.98 10,941.08 10,970.84 11, 000.38 11, 031.62 11, 059.26 11,092.83 11,121.23 11,152.77 11,182.83 11,212.11 11,240.51 11,270.67 11, 303.27 21.42 260.52 8,676.07 -1,416.34 Map +E/-W Northing ~tt> (n) -2 , 800.91 5, 966, 738.40 20.27 260.55 8,723.92 -1,419.34 -2,818.89 5,966,735.03 Map Fasting (ft) Latitude Longitude 654,470.57 70° 18' 57.655 N 148° 44' 52.478 W 654,452.67 70° 18' 57.626 N 148° 44' 53.002 W', 18.04 308.00 8,761.23 -1,416.70 -2,830.46 5,966,737.43 654,441.04 70° 18' 57.652 N 148° 44' 53.340 W'; 13.25 336.23 8,789.59 -1,410.79 -2,835.41 5,966,743.22 654,435.96 70° 18' 57.710 N 148° 44' 53.484 W'. 15.41 26.46 8,818.61 -1,404.09 -2,835.02 5,966,749.93 654,436.21 70° 18' 57.776 N 148° 44' 53.473 W' 21.65 62.66 8,847.93 -1,397.78 -2,828.12 5,966,756.38 654,442.99 70° 18' 57.838 N 148° 44' 53.272 W'', 27.63 85.58 8,874.94 -1,394.73 -2,816.36 5,966,759.68 654,454.67 70° 18' 57.868 N 148° 44' 52.929 W''~ 36.24 65.77 8,900.38 -1,390.55 -2,801.31 5,966,764.18 654,469.63 70° 18' 57.909 N 148° 44' 52.490 W'' ~ 47.67 49.12 8,923.03 -1,379.43 -2,784.50 5,966,775.65 654,486.20 70° 18' 58.018 N 148° 44' 51.999 W '', 56.55 35.88 8,941.21 -1,362.21 -2,768.95 5,966,793.18 654,501.39 70° 18' 58.188 N 148° 44' 51.546 W ~, 66.12 44.32 8,956.18 -1,341.37 -2,751.28 5,966,814.39 654,518.62 70° 18' 58.393 N 148° 44' 51.030 W', 77.35 50.03 8,965.03 -1,323.20 -2,731.61 5,966,832.97 654,537.91 70° 18' 58.571 N 148° 44' 50.457 W I, 83.27 48.80 8,970.12 -1,303.81 -2,708.98 5,966,852.82 654,560.12 70° 18' 58.762 N 148° 44' 49.797 W'~ 88.50 46.86 8,972.27 -1,283.73 -2,686.81 5,966,873.36 654,581.86 70° 18' 58.960 N 148° 44' 49.150 W ~I 93.31 45.16 8,971.80 -1,262.97 -2,665.31 5,966,894.56 654,602.92 70° 18' 59.164 N 148° 44' 48.523 W', 95.53 48.95 8,969.46 -1,242.34 -2,643.15 5,966,915.65 654,624.65 70° 18' 59.367 N 148° 44' 47.877 W I, 96.34 53.80 8,966.40 -1,223.98 -2,620.17 5,966,934.49 654,647.23 70° 18' 59.548 N 148° 44' 47.206 W', 96.18 58.66 8,963.07 -1,207.12 -2,594.96 5,966,951.87 654,672.09 70° 18' 59.714 N 148° 44' 46.471 W'', 94.36 63.08 8,960.26 -1,192.33 -2,568.40 5,966,967.22 654,698.32 70° 18' 59.859 N 148° 44' 45.696 W', 89.63 66.45 8,959.22 -1,179.51 -2,541.20 5,966,980.61 654,725.25 70° 18' 59.985 N 148° 44' 44.903 W'~ 91.53 72.20 8,958.88 -1,167.68 -2,509.85 5,966,993.09 654,756.34 70° 19' 0.102 N 148° 44' 43.988 W 91.04 77.00 8,958.23 -1,160.01 -2,482.03 5,967,001.33 654,784.00 70° 19' 0.177 N 148° 44' 43.176 W'- 90.09 82.52 8,957.94 -1,154.81 -2,453.25 5,967,007.13 654,812.66 70° 19' 0.228 N 148° 44' 42.337 W'. 90.06 88.22 8,957.90 -1,152.35 -2,422.78 5,967,010.24 654,843.07 70° 19' 0.253 N 148° 44' 41.448 W' 90.46 93.71 8,957.76 -1,152.86 -2,392.27 5,967,010.36 654,873.57 70° 19' 0.248 N 148° 44' 40.558 W'I 90.46 90.11 8,957.51 -1,153.89 -2,361.29 5,967,009.98 654,904.57 70° 19' 0.238 N 148° 44' 39.654 W'I 89.72 85.85 8,957.46 -1,152.79 -2,330.07 5,967,011.73 654,935.75 70° 19' 0.249 N 148° 44' 38.743 W', 89.97 81.52 8,957.54 -1,149.49 -2,300.22 5,967,015.66 654,965.52 70° 19' 0.281 N 148° 44' 37.872 W', 90.31 77.44 8,957.47 -1,144.08 -2,271.09 5,967,021.68 654,994.54 70° 19' 0.335 N 148° 44' 37.022 W' 90.28 72.91 8,957.32 -1,136.55 -2,242.64 5,967,029.81 655,022.82 70° 19' 0.409 N 148° 44' 36.192 W ~, 89.85 67.07 8,957.29 -1,126.10 -2,213.95 5,967,040.85 655,051.28 70° 19' 0.512 N 148° 44' 35.355 W ~, 90.49 61.64 8,957.20 -1,113.10 -2,186.86 5,967,054.42 655,078.09 70° 19' 0.640 N 148° 44' 34.565 W'L 90.52 56.79 8,956.92 -1,096.89 -2,159.66 5,967,071.19 655,104.95 70° 19' 0.799 N 148° 44' 33.771 W' 90.06 51.67 8,956.76 -1,078.48 -2,134.11 5,967,090.13 655,130.11 70° 19' 0.980 N 148° 44' 33.026 W' 89.11 46.10 8,956.99 -1,057.32 -2,109.86 5,967,111.79 655,153.90 70° 19' 1.188 N 148° 44' 32.319 W' 89.97 42.68 8,957.23 -1,036.14 -2,089.13 5,967,133.40 655,174.18 70° 19' 1.397 N 148° 44' 31.714 W 89.94 48.03 8,957.25 -1,014.27 -2,066.98 5,967,155.73 655,195.87 70° 19' 1.612 N 148° 44' 31.068 W 87.17 51.31 8,957.97 -995.87 -2,045.31 5,967,174.58 655,217.14 70° 19' 1.793 N 148° 44' 30.436 W 90.15 57.81 8,958.68 -978.23 -2,020.52 5,967,192.74 655,241.56 70° 19' 1.966 N 148° 44' 29.713 W 90.06 63.20 8,958.63 -963.29 -1,994.12 5,967,208.22 655,267.64 70° 19' 2.113 N 148° 44' 28.942 W 91.04 69.72 8,958.34 -951.28 -1,966.54 5,967,220.81 655,294.96 70° 19' 2.232 N 148° 44' 28.138 W 90.95 75.78 8,957.82 -942.46 -1,938.14 5,967,230.22 655,323.17 70° 19' 2.318 N 148° 44' 27.309 W 89.79 80.99 8,957.63 -936.51 -1,909.21 5,967,236.77 655,351.96 70° 19' 2.377 N 148° 44' 26.465 W 89.75 86.58 8,957.76 -933.13 -1,878.17 5,967,240.80 655,382.92 70° 19' 2.410 N 148° 44' 25.560 W 89.32 91.28 8,957.98 -932.62 -1,850.54 5,967,241.89 655,410.53 70° 19' 2.415 N 148° 44' 24.753 W 85.02 92.10 8,959.64 -933.61 -1,817.04 5,967,241.61 655,444.05 70° 19' 2.406 N 148° 44' 23.776 W 85.54 89.01 8,961.97 -933.88 -1,788.74 5,967,241.92 655,472.34 70° 19' 2.403 N 148° 44' 22.950 W 86.89 85.36 8,964.06 -932.33 -1,757.31 5,967,244.13 655,503.73 70° 19' 2.418 N 148° 44' 22.033 W 90.25 83.39 8,964.81 -929.39 -1,727.41 5,967,247.70 655,533.56 70° 19' 2.448 N 148° 44' 21.161 W 91.63 80.07 8,964.33 -925.18 -1,698.44 5,967,252.51 655,562.43 70° 19' 2.489 N 148° 44' 20.316 W 89.97 75.84 8,963.93 -919.25 -1,670.68 5,967,259.02 655,590.06 70° 19' 2.547 N 148° 44' 19.506 W 89.20 72.19 8,964.15 -910.95 -1,641.69 5,967,267.93 655,618.87 70° 19' 2.629 N 148° 44' 18.660 W 90.25 69.06 8,964.31 -900.14 -1,610.94 5,967,279.38 655,649.38 70° 19' 2.735 N 148° 44' 17.763 W 6/16x1009 9:35:34AM Page 3 COMPASS 2003.16 Build 70 BAIQR•^ ~~s • Survey Report -Geographic LNTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 -Slot 16 `Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc -, Well: G-16 North Reference: True Wellbore: G-16A Survey Calculation Method: Minimum Curvature Design: G-16A -Database: EDM .16 - Anc Prod - WH24P Survey ' Measured TVD :below Map Map Depth Inclination Azi muth System +iV/-S +EI-W Northing Easting (ft) (°) (°} (ft) (ft) (ft) (ft) (ft) Latitude Longitude ', 11,329.67 90.95 67.23 8,964.03 -890.31 -1,586.44 5,967,289.72 655,673.67 70° 19' 2.832 N 148° 44' 17.048 W ', 11,360.17 87.88 68.59 8,964.34 -878.84 -1,558.19 5,967,301.78 655,701.68 70° 19' 2.945 N 148° 44' 16.223 W i 11,392.27 85.98 73.99 8,966.06 -868.56 -1,527.84 5,967,312.69 655,731.80 70° 19' 3.046 N 148° 44' 15.338 W 11,428.69 86.53 79.21 8,968.44 -860.14 -1,492.50 5,967,321.84 655,766.95 70° 19' 3.129 N 148° 44' 14.307 W! ', 11,463.00 86.53 79.21 8,970.52 -853.73 -1,458.86 5,967,328.96 655,800.45 70° 19' 3.192 N 148° 44' 13.325 W TD-2718 6/16/2009 9:35:34AM Page 4 COMPASS 2003.16 Build 70 ~%~ . ~~~ • Survey Report -Geographic u~ i ~~ .Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Site: PB G Pad MD Reference:- Vlfell: G-16 North Reference: Wellbore: G-16A Survey Calculation Method: .Design: G-16A .;.Database: Targets Target Name Well G-16 -Slot 16 Mean Sea Level 23:16 9/24/1981.00:00 @ 77.10ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P - hit/miss target Dip Angle Dip Dir. ND +NIS +F_/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude G-16A Target 3 0.00 0.00 8,970.00 -829.12 -1,628.84 5,967,350.00 655,630.00 70° 19' 3.434 N 148° 44' 18.285 W - actual wellpath misses target center by 72.90ft at 11313.03ft MD (8964.24 TVD, -896.59 N, -1601.85 E) - Point G-16A Fault 2 0.00 0.00 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 70° 19' 6.575 N 148° 44' 38.523 W - actual wellpath misses target center by 8736.45ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 Point 2 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 Point 3 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 4 0.00 -599.06 -673.75 5,967,600.00 656,580.00 Point 5 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 6 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 G-16A Target 4 0.00 0.00 8,980.00 -1,091.06 -824.09 5,967,105.00 656,440.00 70° 19' 0.859 N 148° 43' 54.804 W - actual wellpath misses target center by 677.74ft at 11463.OOft MD (8970.52 TVD, -853.73 N, -1458.86 E) - Point G-16A Target 2 0.00 0.00 8,960.00 -982.39 -1,952.15 5,967,190.00 655,310.00 70° 19' 1.926 N 148° 44' 27.718 W - actual wellpath misses target center by 34.23ft at 10945.57ft MD (8958.26 TVD, -949.75 N, -1962.32 E) - Point G-16A Fault 1 0.00 0.00 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 70° 18' 58.816 N 148° 44' 54.466 W - actual wellpath misses target center by 8677.14ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 Point 2 0.00 -1,510.42 -3,008.51 5,966,640.00 654,265.00 G-16A Polygon 0.00 0.00 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 70° 18' 57.120 N 148° 44' 43.918 W - actual wellpath misses target center by 8681.20ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 Point 2 0.00 -1,094.71 -1,604.40 5,967,085.00 655,660.00 Point 3 0.00 -1,141.02 -1,065.21 5,967,050.00 656,200.00 Point4 0.00 -1,185.83 -836.08 5,967,010.00 656,430.00 Point 5 0.00 -1,026.48 -802.73 5,967,170.00 656,460.00 Point6 0.00 -857.21 -1,004.25 5,967,335.00 656,255.00 Point? 0.00 -729.76 -1,596.75 5,967,450.00 655,660.00 Point 8 0.00 -971.50 -2,472.07 5,967,190.00 654,790.00 G-16A Target 1 0.00 0.00 8,955.00 -1,269.78 -2,558.34 5,966,890.00 654,710.00 70° 18' 59.097 N 148° 44' 45.402 W - actual wellpath misses target center by 73.O6ft at 10236.72ft MD (8963.45 TVD, -1208.94 N, -2597.91 E) - Point G-16A Fault 3 0.00 0.00 0.00 -597.88 -968.81 5,967,595.00 656,285.00 70° 19' 5.709 N 148° 43' 59.028 W - actual wellpath misses target center by 8905.10ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -597.88 -968.81 5,967,595.00 656,285.00 Point 2 0.00 -878.63 -459.54 5,967,325.00 656,800.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (~) (ft) Name (in1 (in) 11,463.00 8,970.52 2 7/8 2.875 4.125 6/16/2009 9:35:34AM Page 5 COMPASS 2003.16 Build 70 mar s~~s • Survey Report -Geographic • bR INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Referent®: Mean Sea Level Site: PB G Pad MD Reference: ' 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Well: G-16 North Reference: True Wellbore: G-16A `,'Survey Calculation Method: Minimum Curvature Design: G-16A Database: EDM .16 - Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip Dir. ° ND +N/-S +Et-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) G-16A Target 3 0.00 0.00 8,970.00 -829.12 -1,628.84 5,967,350.00 655,630.00 - actual wellpath misses target center by 72.90ft at 1 1313.03ft MD (8964.24 TVD, -896.59 N, -1601.85 E) - Point G-16A Fault 2 0.00 0.00 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 - actual wellpath misses target center by 8736.45ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 Point 2 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 Point 3 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 4 0.00 -599.06 -673.75 5,967,600.00 656,580.00 Point 5 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 6 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 G-16A Target 4 0.00 0.00 8,980.00 -1,091.06 -824.09 5,967,105.00 656,440.00 - actual wellpath misses target center by 677.74ft at 11463.OOft MD (8970.52 TVD, -853.73 N, -1458.86 E) - Point G-16ATarget2 0.00 0.00 8,960.00 -982.39 -1,952.15 5,967,190.00 655,310.00 - actual wellpath misses target center by 34.23ft at 10945.57ft MD (8958.26 TVD, -949.75 N, -1962.32 E) - Point G-16A Fault 1 0.00 0.00 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 - actual wellpath misses target center by 8677.14ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 Point 2 0.00 -1,510.42 -3,008.51 5,966,640.00 654,265.00 G-16A Polygon 0.00 0.00 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 - actual wellpath misses target center by 8681.20ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 Point 2 0.00 -1,094.71 -1,604.40 5,967,085.00 655,660.00 Point 3 0.00 -1,141.02 -1,065.21 5,967,050.00 656,200.00 Point4 0.00 -1,185.83 -836.08 5,967,010.00 656,430.00 Point 5 0.00 -1,026.48 -802.73 5,967,170.00 656,460.00 Point 6 0.00 -857.21 -1,004.25 5,967,335.00 656,255.00 Point 7 0.00 -729.76 -1,596.75 5,967,450.00 655,660.00 Point 8 0.00 -971.50 -2,472.07 5,967,190.00 654,790.00 G-16A Target 1 0.00 0.00 8,955.00 -1,269.78 -2,558.34 5,966,890.00 654,710.00 - actual wellpath misses target center by 73.O6ft at 10236.72ft MD (8963.45 TVD, -1208.94 N, -2597.91 E) - Point G-16A Fault 3 0.00 0.00 0.00 -597.88 -968.81 5,967,595.00 656,285.00 - actual wellpath misses target center by 8905.10ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -597.88 -968.81 5,967,595.00 656,285.00 Point 2 0.00 -878.63 -459.54 5,967,325.00 656,800.00 Latitude Longitude 70° 19' 3.434 N 148° 44' 18.285 W 70° 19' 6.575 N 148° 44' 38.523 W 70° 19' 0.859 N 148° 43' 54.804 W 70° 19' 1.926 N 148° 44' 27.718 W 70° 18' 58.816 N 148° 44' 54.466 W 70° 18' 57.120 N 148° 44' 43.918 W 70° 18' 59.097 N 148° 44' 45.402 W 70° 19' 5.709 N 148° 43' 59.028 W Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,463.00 8,970.52 2 7/8 2.875 4.125 Design Annotations 6/16/2009 9:35:34AM Page 6 COMPASS 2003.16 Build 70 ~a~ 1NTEQ Company: Project: Site: Wetl: Wellbore: Design: • Survey Report -Geographic • North America -ALASKA - BP Prudhoe Bay PB G Pad G-16 G-16A G-16A Local Co-ordinate Reference: ND `Reference: MD Reference: North Reference: Survey Calculation Method: Database: bR Well G-16 -Slot 16 Mean Sea Level 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P Targets :Target Name - hit/miss target Dip Angle, .Dip Dir. . ND +N/-S +E/-W Northing .Fasting -Shape (°) (°) (ft) {it) (ft) , (ft) (~) Latitude Longitude G-16A Target 3 0.00 0.00 8,970.00 -829.12 -1,628.84 5,967,350.00 655,630.00 70° 19' 3.434 N 148° 44' 18.285 W - actual wellpath misses target center by 72.90ft at 1 1313.03ft M D (8964.24 TVD, -896.59 N, -1601.85 E) - Point G-16A Fault 2 0.00 0.00 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 70° 19' 6.575 N 148° 44' 38.523 W - actual wellpath misses target center by 8736.45ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 Point 2 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 Point 3 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 4 0.00 -599.06 -673.75 5,967,600.00 656,580.00 Point 5 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 6 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 G-16A Target 4 0.00 0.00 8,980.00 -1,091.06 -824.09 5,967,105.00 656,440.00 70° 19' 0.859 N 148° 43' 54.804 W - actual wellpath misses target center by 677.74ft at 11463.OOft MD (8970.52 TVD, -853.73 N, -1458.86 E) - Point G-16A Target 2 0.00 0.00 8,960.00 -982.39 -1,952.15 5,967,190.00 655,310.00 70° 19' 1.926 N 148° 44' 27.718 W - actual wellpath misses target center by 34.23ft at 10945.57ft M D (8958.26 TVD, -949.75 N, -1962.32 E) - Point G-16A Fault 1 0.00 0.00 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 70° 18' 58.816 N 148° 44' 54.466 W - actual wellpath misses target center by 8677.14ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 Point 2 0.00 -1,510.42 -3,008.51 5,966,640.00 654,265.00 G-16A Polygon 0.00 0.00 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 70° 18' 57.120 N 148° 44' 43.918 W - actual wellpath misses target center by 8681.20ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 Point 2 0.00 -1,094.71 -1,604.40 5,967,085.00 655,660.00 Point 3 0.00 -1,141.02 -1,065.21 5,967,050.00 656,200.00 Point 4 0.00 -1,185.83 -836.08 5,967,010.00 656,430.00 Point 5 0.00 -1,026.48 -802.73 5,967,170.00 656,460.00 Point6 0.00 -857.21 -1,004.25 5,967,335.00 656,255.00 Point 7 0.00 -729.76 -1,596.75 5,967,450.00 655,660.00 Point 8 0.00 -971.50 -2,472.07 5,967,190.00 654,790.00 G-16A Target 1 0.00 0.00 8,955.00 -1,269.78 -2,558.34 5,966,890.00 654,710.00 70° 18' 59.097 N 148° 44' 45.402 W - actual wellpath misses target center by 73.06ft at 10236.72ft MD (8963.45 TVD, -1208.94 N, -2597.91 E) - Point G-16A Fault 3 0.00 0.00 0.00 -597.88 -968.81 5,967,595.00 656,285.00 70° 19' 5.709 N 148° 43' 59.028 W - actual wellpath misses target center by 8905.10ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -597.88 -968.81 5,967,595.00 656,285.00 Point 2 0.00 -878.63 -459.54 5,967,325.00 656,800.00 Casing Points Measured Vertical C asing Hole Depth Depth Diameter Diameter (ft) 1n) Name (in) (in) 11,463.00 8,970.52 2 7/8 2.875 4.125 Measured Vertical LocalGoordinates Depth Depth +N/-S +E/-W lft) (ff) (ft) (~) Comment 9,700.00 8,676.07 -1,416.34 -2,800.91 TIP 6/16/2009 9:35:34AM Page 7 COMPASS 2003.16 Build 70 r~tar ias 1NTEQ Company: Project: Site: Well: Wellbore: Design: 'Targets Target Name • Survey Report -Geographic North America -ALASKA - BP Prudhoe Bay PB G Pad G-16 G-16A G-16A by :Local. Co-ordinate Reference: Well G-16 -Slot 16 TVD Reference::. Mean Sea Level MD Reference:: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc .North Reference: True Survey Calculation Method: Minimum Curvature Database; : EDM .16 - Anc Prod - WH24P - hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Fasting -Shape (°1 (°) ' (ft) , (ft) (ft) (ft) (ft) G-16A Target 3 0.00 0.00 8,970.00 -829.12 -1,628.84 5,967,350.00 655,630.00 - actual wellpath misses target center by 72.90ft at 1 1313.03ft MD (8964.24 TVD, -896.59 N, -1601.85 E) - Paint G-16A Fault 2 0.00 0.00 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 - actual wellpath misses target center by 8736.45ft at 9700.OOft MD (8676.07 TVD, -1416.34 N , -2800.91 E) - Polygon Point 1 0.00 -509.50 -2,322.35 5,967,655.00 654,930.00 Point 2 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 Point 3 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 4 0.00 -599.06 -673.75 5,967,600.00 656,580.00 Point 5 0.00 -477.60 -1,696.50 5,967,700.00 655,555.00 Point 6 0.00 -584.52 -2,083.85 5,967,585.00 655,170.00 G-16ATarget4 0.00 0.00 8,980.00 -1,091.06 -824.09 5,967,105.00 656,440.00 - actual wellpath misses target center by 677.74ft at 11463.OOft MD (8970.52 TVD, -853.73 N, -1458.86 E) - Point G-16ATarget2 0.00 0.00 8,960.00 -982.39 -1,952.15 5,967,190.00 655,310.00 - actual wellpath misses target center by 34.23ft at 1 0945.57ft MD (8958.26 TVD, -949.75 N, -1962.32 E) - Point G-16A Fault 1 0.00 0.00 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 - actual wellpath misses target center by 8677.14ft at 9700.OOft MD (8676.07 TVD, -1416.34 N, -2800.91 E) - Polygon Point 1 0.00 -1,298.28 -2,869.03 5,966,855.00 654,400.00 Point 2 0.00 -1,510.42 -3,008.51 5,966,640.00 654,265.00 G-16A Polygon 0.00 0.00 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 - actual wellpath misses target center by 8681.20ft at 9700.OOft MD (8676.07 TVD, -1416.34 N, -2800.91 E) - Polygon Point 1 0.00 -1,470.90 -2,507.54 5,966,690.00 654,765.00 Point2 0.00 -1,094.71 -1,604.40 5,967,085.00 655,660.00 Point 3 0.00 -1,141.02 -1,065.21 5,967,050.00 656,200.00 Point 4 0.00 -1,185.83 -836.08 5,967,010.00 656,430.00 Point 5 0.00 -1,026.48 -802.73 5,967,170.00 656,460.00 Point 6 0.00 -857.21 -1,004.25 5,967,335.00 656,255.00 Point 7 0.00 -729.76 -1,596.75 5,967,450.00 655,660.00 Point 8 0.00 -971.50 -2,472.07 5,967,190.00 654,790.00 G-16A Target 1 0.00 0.00 8,955.00 -1,269.78 -2,558.34 5,966,890.00 654,710.00 - actual wellpath misses target center by 73.06ft at 10236.72ft MD (8963.45 TVD, -1208.94 N, -2597.91 E) - Point G-16A Fault 3 0.00 0.00 0.00 -597.88 -968.81 5,967,595.00 656,285.00 - actual wellpath misses target center by 8905.10ft at 9700.OOft MD (8676.07 TVD, -1416.34 N, -2800.91 E) - Polygon Point 1 0.00 -597.88 -968.81 5,967,595.00 656,285.00 Point 2 0.00 -878.63 -459.54 5,967,325.00 656,800.00 Casing Points Latitude Longitude 70° 19' 3.434 N 148° 44' 18.285 W 70° 19' 6.575 N 148° 44' 38.523 W 70° 19' 0.859 N 148° 43' 54.804 W 70° 19' 1.926 N 148° 44' 27.718 W 70° 18' 58.816 N 148° 44' 54.466 W 70° 18' 57.120 N 148° 44' 43.918 W 70° 18' 59.097 N 148° 44' 45.402 W 70° 19' 5.709 N 148° 43' 59.028 W Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (tt) Name (in) (in) 11,463.00 8,970.52 2 7/8 2.875 4.125 9,751.20 8,723.92 -1,419.34 -2,818.89 KOP 11,463.00 8,970.52 -853.73 -1,458.86 TD 6/16/2009 9:35:34AM Page 8 COMPASS 2003.16 Build 70 ~Lt s ~ ills 1NTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB G Pad Well: G-16 Wellbore: G-16A Design: G-16A • Survey Report -Geographic Locat Co-ordinate Reference ND Reference: MD Reference: North Reference: Survey-Calculation Method: Database: by Well G-16 -Slot 16 Mean Sea Level 23:16 9/24/1981 00:00 @ 77.10ft {generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P Checked By: Approved By: Date: 6/16/2009 9:35:34AM Page 9 COMPASS 2003.16 Build 70 /EI..LHEAD= _ __ McEV CTUATOR = ~ AXEL_; B. ELEV'= 77 F. ELEV = 41 OP = 3'. ax Angle = 96° ~ tQ; alum MD = 9E alum TV D = 8800' 13-3/8" CSG, DRLG D~,FT G-16A N-80, ID = 12.347" ~-i 2684' I7" LNR, 26#, L-80, ID = 6.276" ~~ 8678' 112" TBG, 12.6#, 13CR80, .0152 bpf, ID = 3.958" 8699' Minimum ID =1.81" @ 9,388' 41/7' TBG STUB (07/10/03) 41 /2" TBG, 12.6#, L-80, .Ot 52 bpf, ID = 3.958" OF T' LNR ~--~ $$53' 19-5/8" CSG, 47#, L-80, ID = 8.681" ~ 9347' 3-1/2" TBG PUNCHES 9494-97 20° 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 9596' Pilot Hole Whipstock @ 9,750' 2.80" Pilot Hole TD @ --9,780' PERFORATION SUMMARY REF LOG: XXXXX ON MM/DD/YY ANGLEATTOPPERF: 91 ~ 10329' Note: Refer to Production DB for historical pert data 1° SIZE ~ SPF ~ INTERVAL ~ OPN/SOZ ~ DATE J SLTD 10329 - 11462 O 06/16/09 "' 4 ~" CHROME TBG "* 1993' T' LNR TIEBACK 2004' 7" X 9-5/8" ZXP LNR PKR, ID = 6.276" 2214' 41 !2" HES X NIP, ID = 3.813" GA S LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3286 3285 5 KBG2 DOME BK 16 0627/C 2 7179 6503 35 KBG2 SO BK 20 O6/27/C 1 8467 7620 25 KBG2 DMY BK 0 10/09/C $~5' 4112" HES X NIP, ID = 3.813" 8557' 7" X 41/2" BKR S-3 PKR 8668' 41 /7' X NIP, ID = 3.813" 8678' 7" X 5-1/2" XO, ID = 4.892" 8700' 5-1 /2" X 41 /2" XO, ID = 3.958" $7~ ~' 4112" HES X NIP, ID = 3.813" 8723' UNKIUE MACHINE OVERSHOT 8789' 9-518" X 41 /2" OTIS RH PKR, ID = 3.937' 8790' 41 /2" X 3- i /2" XO 9384' ~-i,S-1/1" Llt'IU= l.tfl I 9390' Top of Liner TSGR = 9373' 9595' T' X 3-1/2" OTIS HCL PKR, ID = 3.88" 9607' CTM TT CUT ON MILLOUT EXT. (02/29!08}, ID = BCGL = 9748' 10329' 12-3/8", 4.7#, L-80, STL Solid LNR w / turbos PBTD 11461' 2-3/8". 4.7#, L-8G, STL Slotted LNR, ID = 1.995" 11461' TOP OF 2-718" TBG TAIL (-101' LONG) (02/29/08) ESTMATED TOP OF FILL (02/29/08} PBTD 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" --C DATE REV BY COMMENTS DATE REV BY COMMENTS 10/14/81 ORIGINAL COMPLETION 02/13/88 RIG WORKOVH2 10/05103 DAC/TLP RWO 06/18/09 Nordie 1 CTD SIDETRACK 06!23/09 PJC DRLG HO CORRECTIONS 06/27/09 DMS/TLH GLV GO & PERF CORRECTION PRUDHOE BAY UNIT WELL: G16A PERMfT No: 209056 API No: 50-029-20643-01 SEC 12, T11 N, R13E•; 1864' FSL & 2277' FWL BP Exploration (Alaska) r ALASSiA OIL A1~TD GAS CO1~T5ERQA7'IO1~T COMl-IISSIOI~T John McMullen Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 SARAH PALIN, GOVERNOR ' 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, G-16A Well BP Exploration (Alaska) lnc. Permit No: 209-056 Surface Location: 3414' FNL, 3003' FEL, SEC. 12, Tl 1N, R13E, UM Bottomhole Location: 4505' FNL, 3827' FF.,L, SEC. 12, T 1.1 N, R 13E, UM Dear Mr. McMullen Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Cade unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission. order, or the terms anal conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Cathy Foerster Commissioner DATED thisSday of May, 2009 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Revised Start date for G-16A Sidetrack Page 1 of 1 Maunder, Thomas E (DOAj From: Sarber, Greg J [SarberJG@BP.com] Sent: Wednesday, May 20, 2009 10:50 AM To: Maunder, Thomas E (DOA) Subject: Revised Start date for G-16A Sidetrack Hi Tom, This letter is just to give you a heads up that the expected start date for a coiled tubing sidetrack from well G-16 has been moved up from June 15 to May 30th. Can you place the approval of the PTD application for well G-16A in your queue accordingly? Thanks for the help. Cheers, Greg Ph: (907) 564-4330 Cell: (907) 242-8000 Email: sarberjg@bp.com 5/20/2009 STATE OF ALASKA ~ S,~O ~ ~~ ~~ ~~ ~~ AKA OIL AND GAS CONSERVATION CO~SSION ~~,,~.~`,~ ~ ~ ZOD9 ~~ PERMIT TO DRILL ~~r~~ 20 AAC 25.005 .,~.; ,; tip. gas Sl~n~. Cammissiori 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is p ~ ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU G-16A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12125' TVD 8980'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028280 Oil Pool 3414 FNL, 3003 FEL, SEC. 12, T11N, R13E, UM Top of Productive Horizon: 4685' FNL, 283' FEL, SEC. 11, T11N, R13E, UM 8. Land Use Permit: 13. Approxima~'t'e_S~p,.u~d Date: ~"~U ~ ~ ~~. 2009 QQ-~ Total Depth: 4505' FNL, 3827' FEL, SEC. 12, T11 N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 17,280' 4b. Location of Well (State Base Plane Coordinates): Surface: x-657241 y-5968213 Zone-ASP4 10. KB Elevation (Height above GL): 77.1' feet 15. Distance to Nearest Well within Pool: 350' 16. Deviated Wells: Kickoff Depth: 9770 feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3622 Surface: 2742 1~ si f ifi i n T in D m f m t r s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.7# L-80 TL 2685' 9440' 84 12125' 898 ' s cu ft CI s'G' fig, PRESE NTWELL CONDITION S UMMARY (To be completed forRedrilland Re-entry Operations) Total Depth MD (ft): 10195' Total Depth TVD (ft): Plugs (measured): 920 ' 9974' Effective Depth MD (ft): 10135' Effective Depth TVD (ft): 9154' Junk (measured): 9873' Casing 'Length Size Cement Volume MD TVD Conductor /Structural 11 " x 30" n re 1 1 ' Surface 2684' 1 -3/8" 3621 cu ft Permafros II 2684' 2684' Intermediate 9347' - / " 1277 cu ft Class'G' 1 u ft PF'C' 9347' 8422' Pr i n Liner 1343' 7" 372 u ft Class 'G' 8852' - 10195' 79 8' - 9209' Liner 6737' 7" x 5-1/2" x 4-1/2" 12 7 c lass'G' 199 ' - 8730' 19 ' - 78 8' Perforation Depth MD (ft): 9796' - 10018' Perforation Depth TVD (ft): 8842' - 9046' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Greg Sarber, 564-4330 Printed Name Joh c Title Engineering Team Leader Prepared By NarneMumber. Si nature Phone 564-4711 Date ~~ Q Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: .-2 ~' API Number: 50-029-20643-01-00 Permit Approval See cover letter for at : 2r O o herre uire n s Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: ~;7v© ~t r~`L"~ES~ Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ®No HZS Measures: Yes ^ No Directional Survey Req'd: 'Yes ^ No aSD~O ~SZ r^Z v~\r,..v t~-0.t~'ni~~.C~S~" Other: PPROVED BY THE COMMISSION Date S - ~ - ~ COMMISSIONER :~ ~'{ ~~ Form 10-401 Revised 12/2005 ~ / Submit In Duplicate ~RIGi~AL by BPXA Prudhoe Bay G-16A CTD Sidetrack To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Greg Sarber CTD Engineer Date: April 28, 2009 Re: PBU G-16A Permit to Drill Permit to Drill approval is requested for a sidetrack lateral from the G-16 parent well. Well History Well G-16 was completed in October 1981, and perforated into the gas cap as part of a gas equity study. Two unsuccessful sodium silicate squeezes were performed in an attempt to seal off the gas cap perforations. The well had a RWO in November 1987 and was completed with a straddle to isolate the gas cap perforations. The well struggled to produce after the workover despite two mud acid jobs. Add perfs had to be shot in early 1991 to make the well a steady producer. In 1993, perforations were added in a 26P lens. The lens perforation was successful and the well made additional oil with only a slightly higher GOR. At some point in the early 1990s the straddle that was isolating the gas cap equity perforations began leaking. The leak was confirmed with a log in April 2006. The leak was at a collar so a patch was place over it and GOR dropped from 20,000 to 5,000 scf/bbl. Soon after the patch was run, the high GOR resurfaced and it was determined that the 9-5/8" packer that made up the top of the straddle was leaking. In May 1996, tubing punch holes were shot near the bottom of the straddle and circulation was established up the IA through the leaky packer. Cement was circulated into the straddle while taking returns up the IA and the gas was shutoff. A loss of tubing integrity was noted in 2002. A RWO package was issued for a simple tubing swap to replace corroded 4-1/2" L-80 tubing with 4-1/2" 13Cr tubing. During the pre-rig prep work, the well failed CMIT-TxIA with an immeasurable liquid leak rate, this was the first indication that the production casing might have lost integrity. The rig moved onto the well in September 2003, pulled tubing and then confirmed the casing leak with a retrievable packer and pressure testing. A 7" liner was run to cover the casing leak and then the 4-1/2" 13Cr tubing was run to complete the workover. After the workover, considerable effort went into fishing a plug from the 2-7/8" tubing tailpipe. In the end, tubing punches were shot above the fish so the well could be produced. The geometry of the packer bore, millout extension, tailpipe and fish prevented a chemical cut or jet cut from being performed to drop the tailpipe into the rat hole. In February 2008, G-16 was selected to field trial the Schlumberger Abrasi-Jet tool to cutoff the tailpipe and restore access to the 7" liner. The Abrasi-Jet tool suffered a mechanical failure downhole so an under-reamer contingency was exercised and it successfully cutoff the tailpipe. This has restored access to the 7" and set the well up for a tiny tools sidetrack. The well is currently a low on time cycle well. It produces at a higher than marginal GOR, and has little remaining reserves in it's existing drainage pattern. Reason for PTD Request -Your approval is requested to drill a coil sidetrack lateral from the G-16 parent well. This lateral will relocate the drainage pattern to Zone 1 B Ivishak. There is also a significant oil pad in Zn 2A overlying ZN1 B in this area. i zone has fair to good permeability and ~Id provide good recharge to the well from above. 6. 7. 8. "T1~~ s 9. 10. P~~~k 11. 12. 13. 14. 15. 16. CTD Sidetrack Summary Pre-Rig Work Summary: 1. V PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 2. W Function LDS 3. W PPPOT-T 4. S Dummy all GLM's 5. S Drift and Tag top of fill in 7" 6. E Run SCMT in 7" liner and in cemented tubing tail up to the packer at 8,789'. 7. F MIT-IA to 3000 psi, OA to 2000 psi. 8. C Pump 17# Cement plug from PBTD up to the tubing tail at 9,607' 9. O Set BPV 10 .0 Bleed T, IA, gas lift and production flowlines down to zero and blind flange. 11 .0 Remove S-Riser, Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on June 15, 2009 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. ~~-«~ 3. Pull BPV. 4. Drill 2.80" pilot hole in cement plug inside 7" liner, below the tubing tail. 5: Seta 2.625" whipstock inside the pilot hole (~ 9,750', oriented with the tray face aligned to the casing wall. Mill 2.74" window at 9,750'. Drill build/turn section of the G-16A lateral with 2.70"x3.0" bicenter bit, and land well. Drill lateral section to 12,125' MD. Run and cement a 2-3/8" solid liner string. Make a cleanout run with mill and motor. Make a logging run with a SWS GR-CNL logging tool. Make a perforating run with 1.56" OD pert guns. Run KB liner top packer into the G-16A lateral liner top. Circulate well to KWF brine. FP well to 2000' with diesel. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run live gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 2.70" x 3.0" (bi-center bits used) Casing Program: Asolid/ce~ted liner • 2-3/8", L-80 4.70# STL Solid Liner 9,440' and -12,125' and • A minimum of 10 bbls 15.8 ppg cement will be used for liner cementing. (Assuming 3.0" bit size and TD ~ 12,004', with 20% excess in the open hole interval) • TOC planned at 9,440' (Top of Liner) Existing casing/tubing Information 13-3/8", N-80 72#, Burst 5380, collapse 2670 psi 9 5/8", L-80 47#, Burst 6870, collapse 4750 psi 7", L-80 29#, Burst 8160, collapse 7656 psi 4-1/2", 13Cr80 12.6#, Burst 8430, collapse 7500 psi 3-1/2", L-80, 9.3#, Burst 10,160, collapse 10,540 psi Well Control: • BOP diagram is attached. • 2" coil will be used to drill the laterals • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. Directional • See attached directional plans. Maximum planned hole angle on the G-16A lateral is 89.9 deg ~ 10,781' . • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 17,280'. • Distance to nearest well in pool is 350' SE to well G-27A. Logging • MW D directional and Gamma Ray will be run over all of the open hole sections. • Gamma Ray, CCL and CNL will be run after the lateral is cased. Hazards • The maximum H2S concentration on the parent G-16 well is 10 ppm recorded on 9/17/2000. • The maximum H2S concentration on the pad is on well G-10C at 40 ppm on 11/01/2007. Reservoir Pressure • The reservoir pressure on G-16 was last recorded at 3,622 psi at 8,800' TVDSS in March 1988. (7.92 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,742 psi. Greg Sarber CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble DATE REV BY COMfvENTS DATE REV BY C.OMu1=NfS 1a1a1a1 owGINAI. coMPLETiON 11/2or03 CAOrnP TlrBNG RJNCH 02113!88 RIG YVORKOV62 06/12!07 KS8IPJC GLV GO 10/05/03 DAC/TL RWO 03!10!08 RM-U1LH T7 CUT & MLLED (02129!08) 10!11!03 JBRNTLH GLV C!O 10/24103 lfLH CORRECTIONS 1 t/18103 M-ViLH FISH LEFT N HOLE PRUDHOE BAY UNIT wELL: G-16 PER1uIR No: 1811220 AR No: 50.029-20643-00 SEC 12, T11N. R13E 1864' FSL & 227T FWL ~ Exploration (Alaska) TREE= 4" McEVOY • NOTES: 7 CIRC HOLES (CMT) 9494- 9497' W~LHEAD= McEVOY ~ ~ C •••4-'l /2"CHROMETBG"'" ACTUATOR = AXELSON ~ V KB. ELEV = 7 7.08' Ir¢x:= ~ rv~c~vr 'VELLh£AD= McEVOY CTIWTOR= __ A.XEISON - __ _. B EiEV = 77 08' F E1.EV = 41 53' C)F' = 3500' -- - -- x Angle = . a1 ~~ 5100' tum Mtn = 983b' ~~ ~CI / fMJICO~ f bRttV. 11V lGJ 1+r.111r yMyti- i451r L••- 6-1 r7•' CMgr1MC TRfS ••• 1993' T" LPR T f ---~ 2004' ~~' X S-5r8" ZXP LNR PttR. D = 6.278" 113.3J8" CSC; ; 2tK, N-80. D = 12 3a l" I T• LNR 26a~, L-80, D = 6.276" ~-j 867$ 6~f 13CR80 '~~' :'~2 t of ~C~ = 3 .+.'•8' 8659' Minimum ID = +TQPOF?' LNR r--~ 8853' b'- 9 5~~' CSC, a7N. L 80. D = 8.681• ~ 9347' 3-1x2' TUBING PL,NCZ•£5 9494-97 0 ~~ 3-112" TBG, 9.3a, L-80, .OOB7 dpf, D = 2.992" 9596' Pilot Hole'Alhipstock ~ 9,70' 1 2-80" Pilot Hole TD ~~ ~9,780'~ PFRFORATIDN SUMrWRY REF LOG' OA BNCA ON 1Df10l81 ANGLEATTOPPB~F 2D~9492' Note: Refer to Production OB for nbtor~at pert Data SIZE SPF WTERVAL OPN+SQZ DATE 2" 8 9492 - 9565 S OS++'27r95 2-1t8' E 4 9796 -8812 O 10V19r93 2.1r$ 4 9950 •9992 tJ t G OQlZ9'88 2-118' 1 9998 •9999 ,. O7r13r9t 2-u8' ~ 1 10003 - 1D0Ud t, 0¢r13r91 2-1;8' 1 10013-1D018 ., 02113J91 ST b/D TVf? L~ TYPE vLV LATrs1 aaRT MTE 3286 3285 5 KBG-2 ', LJAfY BK 0 C~il1 znpT 2 7179 65D3 35 KBG-2 Dh1Y BK 0 C6rt 2~t?7 1 8a6 r' 7520 25 KBG-2 y Dhtl' BK 0 10+9!'(73 8535' a- t,2" hE5 % NP D = 8557' x a'.7" ~?KR S-:+ =~ 8666' _ 4- . r2 . X NIP, ID = 2 ;1~. ~~~ r• x 5-1r2• xo D = a HES X NIP, D = 3.813" E MACHINE OVERSk1QT X d-1;2' OTIS tiFi f?ICR, D • X 3 1,+2' Xd TSGR = 9373` 2 7J' BKR D[FL OY tdfNT .SLL' IR = 1969" 7" X 3-tr2' OTIS HCL PKR D = s „,B. BCGL = 9748' 2-3; 8" LPR 4 fib L-84 CC39 CPf. ID= 1.041" 12125' TAIL (-101' I.ONC, (02r29K16} FFfi.a'JNDE BAY I.IJT UVELL. Cr16+~ R7114fT No. AR No: 5U-629-20643-0' SEG li. T11N, ft13E. 166,' F'6L 3i ii7T fif~l. BP Exploration (Alaska) Rig Floor to To of Wt?II G-16A 2.25 9.23 20.04 ~ Tree Size ,, ., 22.88 to Com ~. ~C ~ L Kill Line 2 3; 8' z 3 v2• 2 1;16" 5000 psi , RX-24 Variable Ram •- 7 1! 16" X 3 1 ~ 8" Flanged Adapter Swab Valve SSV Master Valve Lock Down Screws Ground Level ~~ ~~ BAKER 1~lii~8 INTEQ North America -ALASKA - BP Prudhoe Bay PB G Pad G-16 -Slot 16 Plan 4, G-16A Pian: Plan 4 Baker Hughes INTEQ Planning Report 28 April, 2009 by r ~~~ f INTEQ BP Exploration Alaska Baker Hughes INTEQ Planning Report by Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 - Siot 16 Project: Prudhoe Bay 7VD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drilling Well: G-16 North Reference: True Welibore: Plan 4, G-16A Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad, TR-11-13 - _ _ -- Site Position: Northing: 5,966,832.87 ft Latitude: 70° 18' 58.211 N From: Map Easting: 656,301.39 ft Longitude: 148° 43' 59.073 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Conve rgence: 1.19 ° Well G-16 -Slot 16, G-16 _ _ Well Position +N/-S 0.00 ft Northing: 5,968,213.00 ft Latitude: 70° 19' 17.590 N +E/-W 0.00 ft Easting: 657,241.00 ft Longitude: 148° 43' 30.759 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft ~ Welibore Plan 4. G-16A , Magnetics Model Name Sample Date Declination Dip Angle Field Strength Design ~ Audit Notes: Version: Vertical Section: BGGM2008 4/27/2009 22.73 80.93 57,707 Plan 4 Phase: PLAN Depth From (TVD) +N/-S (ft) (ft) 37.02 0.00 Tie On Depth: 9,700.00 +E/-W Direction (ft) (°) 0.00 80.00 4/28/2009 11:36:19AM Page 2 COMPASS 2003.16 Build 70 Ilan BP Exploration Alaska s Baker Hughes INTEQ Planning Report bP INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Well: G-16 North Reference: True Wellbore: Plan 4, G-16A Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM .16 - Anc Prod - WH24P Survey Tool Program Date 4/28/2009 From To (ft) (ft) Survey (Weflbore) Tool Name Description 100.00 9,700.00 1 : Sperry-Sun BOSS gyro multi (G-16) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,700.00 12,125.00 Plan 4 (Plan 4, G-16A) MWD MWD -Standard -- - - - - - - -~ Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (~) (°) (°) (ft) (ft) (n) (~) (ft) (°/100ft) (n) (°) 9,700.00 21.42 260.52 8,676.07 -1,416.34 -2,800.91 5,966,738.40 654,470.57 0.00 -3,004.31 0.00 TIP 9,750.00 22.04 260.55 8,722.52 -1,419.39 -2,819.17 5,966,734.97 654,452.38 1.24 -3,022.82 1.04 KOP 9,770.00 20.24 260.55 8,741.17 -1,420.57 -2,826.29 5,966,733.64 654,445.29 9.00 -3,030.03 -180.00 End of 9 Deg1100' DLS 9,800.00 11.95 290.04 8,770.02 -1,420.36 -2,834.35 5,966,733.68 654,437.23 38.00 -3,037.93 148.95 9,805.77 11.00 299.99 8,775.67 -1,419.88 -2,835.39 5,966,734.14 654,436.18 38.00 -3,038.87 120.49 4 9,827.81 11.00 344.99 8,797.35 -1,416.79 -2,837.76 5,966,737.18 654,433.74 38.00 -3,040.67 112.1 5 9,847.74 11.25 25.00 8,816.93 -1,413.19 -2,837.43 5,966,740.79 654,434.00 37.99 -3,039.72 107.87 6 9,865.64 11.50 59.99 8,834.50 -1,410.71 -2,835.14 5,966,743.31 654,436.23 38.01 -3,037.04 105.17 7 9,900.00 24.56 60.00 8,867.10 -1,405.40 -2,825.96 5,966,748.81 654,445.31 38.00 -3,027.07 0.01 9,966.96 50.00 60.00 8,919.95 -1,385.29 -2,791.12 5,966,769.65 654,479.71 38.00 -2,989.27 0.00 8 10,000.00 62.56 60.00 8,938.25 -1,371.58 -2,767.37 5,966,783.85 654,503.17 38.00 -2,963.50 0.00 10,070.91 89.50 60.00 8,955.22 -1,337.49 -2,708.32 5,966,819.17 654,561.48 38.00 -2,899.43 0.00 End of 38 Deg1100' DLS 10,100.00 89.50 63.49 8,955.47 -1,323.72 -2,682.71 5,966,833.47 654,586.80 12.00 -2,871.81 90.00 10,200.00 89.52 75.49 8,956.33 -1,288.75 -2,589.22 5,966,870.39 654,679.53 12.00 -2,773.67 89.97 4/28/2009 11:36:19AM Page 3 COMPASS 2003.16 Build 70 r BP Exploration Alaska Baker Hughes INTEQ Planni ng Report by 1INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Reference: 23:16 9!24/1981 00:00 @ 77.10ft (generic drillinc Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Well: G-16 North Reference: True. Wellbore: Plan 4, G-16A Survey Calculat ion Method: Minimum Curvature Design: Plan 4 Database: EDM .16 - Anc Prod - WH24P Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (it) (°) (°) (ft) (ft) (ft) (ft) (ft) ('1100ft) (ft) (°) 10,221.00 89.52 78.01 8,956.50 -1,283.94 -2,568.78 5,966,875.63 654,699.86 12.00 -2,752.71 89.8 10 10,300.00 89.53 68.53 8,957.16 -1,261.23 -2,493.21 5,966.,899.92 654,774.93 12.00 -2,674.34 -90.00 10,400.00 89.56 56.53 8,957.95 -1,215.18 -2,404.65 5,966,947.80 654,862.50 12.00 -2,579.13 -89.92 10,411.00 89.56 55.21 8,958.04 -1,209.01 -2,395.55 5,966,954.16 654,871.48 12.00 -2,569.09 -89.83 11 10,500.00 89.75 65.89 8,958.57 -1,165.32 -2,318.16 5,966,999.46 654,947.93 12.00 -2,485.30 89.00 10,561.00 89.89 73.21 8,958.76 -1,144.02 -2,261.04 5,967,021.95 655,004.58 12.00 -2,425.35 88.94 12 10,600.00 89.89 68.53 8,958.83 -1,131.24 -2,224.21 5,967,035.50 655,041.14 12.00 -2,386.85 -90.00 10,700.00 89.90 56.53 8,959.02 -1,085.19 -2,135.65 5,967,083.39 655,128.71 12.00 -2,291.64 -89.99 10,781.00 89.90 46.81 8,959.16 -1,035.02 -2,072.18 5,967,134.88 655,191.10 12.00 -2,220.43 -89.97 13 10,800.00 89.78 49.09 8,959.21 -1,022.29 -2,058.08 5,967,147.90 655,204.94 12.00 -2,204.33 93.00 10,900.00 89.17 61.07 8,960.13 -965.15 -1,976.24 5,967,206.73 655,285.55 12.00 -2,113.81 92.99 10,931.00 88.98. 64.79 8,960.63 -951.05 -1,948.64 5,967,221.41 655,312.85 12.00 -2,084.19 92. 14 11,000.00 88.42 73.05 8,962.20 -926.25 -1,884.33 5,967,247.55 655,376.62 12.00 -2,016.55 94.00 11,081.00 87.80 82.75 8,964.88 -909.30 -1,805.27 5,967,266.15 655,455.30 12.00 -1,935.75 93.81 15 11,100.00 87.92 80.47 8,965.60 -906.54 -1,786.49 5,967,269.31 655,474.02 12.00 -1,916.77 -87.00 11,200.00 88.60 68.49 8,968.64 -879.84 -1,690.36 5,967,298.01 655,569.57 12.00 -1,817.46 -86.91 11,206.00 88.65 67.77 8,968.79 -877.61 -1,684.79 5,967,300.36 655,575.08 11.99 -1,811.59 -86.55 16 11,300.00 88.67 79.05 8,970.99 -850.82 -1,594.87 5,967,329.02 655,664.41 12.00 -1,718.39 90.00 11,396.00 88.75 90.58 8,973.16 -842.16 -1,499.45 5,967,339.67 655,759.63 12.00 -1,622.91 89.74 17 11,400.00 88.77 91.06 8,973.24 -842.22 -1,495.45 5,967,339.70 655,763.63 12.01 -1,618.98 88.50 4/28/2009 11:36:19AM Page 4 COMPASS 2003.16 Build 70 BP Exploration Alaska Baker Hughes INTEQ Planning Report bP INTEQ Company: North America -ALASKA - BP Local Go-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Well: G-16 North Reference: True Wellbore: Plan 4, G-16A Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM .16 - Anc Prod - WH24P Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) (°) (°) (ft) (ft) (ft) (ftl (ft) (°l100ft) lft) (°) 11,500.00 89.11 103.05 8,975.11 -854.48 -1,396.41 5,967,329.52 655,862.90 12.00 -1,523.57 88.4 11,600.00 89.49 115.05 8,976.34 -887.06 -1,302.06 5,967,298.93 655,957.90 12.00 -1,436.32 88.27 11,606.00 89.51 115.77 8,976.39 -889.63 -1,296.65 5,967,296.47 655,963.37 11.99 -1,431.43 88.12 18 11,700.00 89.52 104.49 8,977.19 -921.93 -1,208.53 5,967,266.03 656,052.13 12.00 -1,350.26 -90.00 11,740.00 89.53 99.69 8,977.52 -930.30 -1,169.43 5,967,258.48 656,091.40 12.00 -1,313.21 -89.90 19 11,800.00 89.53 106.89 8,978.01 -944.08 -1,111.08 5,967,245.92 656,150.02 12.00 -1,258.14 90.00 11,900.00 89.56 118.89 8,978.81 -982.90 -1,019.12 5,967,209.04 656,242.76 12.00 -1,174.32 89.94 11,965.00 89.58 126.69 8,979.30 -1,018.07 -964.52 5,967,175.02 656,298.08 12.00 -1,126.66 89.85 20 12,000.00 89.58 122.49 8,979.56 -1,037.94 -935.72 5,967,155.77 656,327.30 12.00 -1,101.74 -90.00 12,100.00 89.60 110.49 8,980.28 -1,082.45 -846.38 5,967,113.13 656,417.54 12.00 -1,021.49 -89.97 12,124.99 89.60 107.49 8,980.45 -1,090.58 -822.75 5,967,105.50 656,441.33 12.00 -999.63 -89.88 TD at 12125.00 12 125 00 60 89 107 49 8 980 45 -1 090 59 822 74 5 967 105 50 441 656 34 12 00 , . . . , . , . - . , , . , . . -999.62 -89.8 4/28/2009 11:36:19AM Page 5 COMPASS 2003.16 Build 70 1- ~~.r ~'S INTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB G Pad Well: G-16 Welibore: Plan 4, G-16A Design: Plan 4 Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD - Shape (°) (°) (ft) BP Exploration Alaska Baker Hughes INTEQ Planning Report by Local Co-ordinate Reference: Well G-16 -Slot 16 TVD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P +N/-S +E/-W (ft) (ft) G-16A Target 3 0.00 0.00 9,047.10 -829.12 -1,628.84 - plan misses target center by 28.63ft at 1 1273.58ft MD (9047.48 TVD, -856.55 N, -1620.65 E) - Point G-16A Fault 2 0.00 0.00 77.10 -509.50 -2,322.35 - plan misses target center by 8736.45ft at 9700.OOft MD (8753.17 TVD, -1416.34 N, -2800.91 E) - Polygon Point 1 77.10 -509.50 -2,322.35 Point 2 77.10 -584.52 -2,083.85 Point 3 77.10 -477.60 -1,696.50 Point 4 77.10 -599.06 -673.75 Point 5 77.10 -477.60 -1,696.50 Point 6 77.10 -584.52 -2,083.85 G-16A Target 4 0.00 0.00 9,057.10 -1,091.06 -824.09 - plan hits target center - Point G-16A Target 2 0.00 0.00 9,037.10 -982.39 -1,952.15 - plan misses target center by 26.57ft at 1 0913.60ft MD (9037.44 TVD, -958.74 N, -1964.24 E) - Point G-16A Fault 1 0.00 0.00 77.10 -1,298.28 -2,869.03 - plan misses target center by 8677.14ft at 9700.OOft MD (8753.17 TVD, -14 16.34 N, -2800.91 E) - Polygon Point 1 77.10 -1,298.28 -2,869.03 Point 2 77.10 -1,510.42 -3,008.51 G-16A Polygon 0.00 0.00 77.10 -1,470.90 -2,507.54 - plan misses target center by 8681.20ft at 9700.OOft MD (8753.17 TVD, -14 16.34 N, -2800.91 E) - Polygon Point 1 77.10 -1,470.90 -2,507.54 Point 2 77.10 -1,094.71 -1,604.40 Point 3 77.10 -1,141.02 -1,065.21 Point 4 77.10 -1,185.83 -836.08 Point 5 77.10 -1,026.48 -802.73 Point 6 77.10 -857.21 -1,004.25 Point 7 77.10 -729.76 -1,596.75 Northing Easting , (ft) (ft) Latitude Longitude 5,967,350.00 655,630.00 70° 19' 3.434 N 148° 44' 18.285 W 5,967,655.00 654,930.00 70° 19' 6.575 N 148° 44' 38.523 W 5,967,655.00 654,930.00 5,967,585.00 655,170.00 5,967,700.00 655,555.00 5,967,600.00 656,580.00 5,967,700.00 655,555.00 5,967,585.00 655,170.00 5,967,105.00 656,440.00 70° 19' 0.859 N 148° 43' 54.804 W 5,967,190.00 655,310.00 70° 19' 1.926 N 148° 44' 27.718 W 5,966,855.00 654,400.00 70° 18' 58.816 N 148° 44' 54.466 W 5,966,855.00 654,400.00 5,966,640.00 654,265.00 5,966,690.00 654,765.00 70° 18' 57.120 N 148° 44' 43.918 W 5,966,690.00 654,765.00 5,967,085.00 655,660.00 5,967,050.00 656,200.00 5,967,010.00 656,430.00 5,967,170.00 656,460.00 5,967,335.00 656,255.00 5,967,450.00 655,660.00 4/28/2009 11:36:19AM Page 6 COMPASS 2003.16 Build 70 r BP Exploration Alaska Baker Hughes INTEQ Plann ing Report by INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well G-16 -Slot 16 Project: Prudhoe Bay TVD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc Site: PB G Pad MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc" Well: G-16 North Reference: True Wellbore: Plan 4, G-16A Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM .16 - Anc Prod - WH24P Point 8 77.10 -971.50 -2,472.07 5,967,190.00 654,790.00 G-16A Target 1 0.00 0.00 9,032.10 -1,269.78 -2,558.34 5,966,890.00 654,710.00 70° 18' 59.097 N 148° 44' 45.402 W - plan misses target center by 11.63ft at 10235.07ft MD (9033.72 TVD, -1280.81 N, -2555.06 E) - Point ~ G-16A Fault 3 0.00 0.00 77.10 -597.88 -968.81 5,967,595.00 656,285.00 70° 19' 5.709 N 148° 43' 59.028 W ~ -plan misses target center by 8905.10ft at 9700.OOft MD (8753.17 TVD, -1416.34 N, -2800.91 E) ~ -Polygon ' Point 1 77.10 -597.88 -968.81 5,967,595.00 656,285.00 Point 2 77.10 -878.63 -459.54 5,967,325.00 656,800.00 Casing Points Measured Vertical Depth Depth (~) (ft) 12,125.00 9,057.55 2.375" Casing Hole Diameter Diameter Name (in}, (in) 2.375 3.000 4/28/2009 11:36:19AM Page 7 COMPASS 2003.16 Build 70 1 lll/.It~ s INTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB G Pad Well: G-16 Wellbore: Plan 4, G-16A Design: Plan 4 Plan Annotations BP Exploration Alaska Baker Hughes INTEQ Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Measured Vertical Local Coordinates Depth Depth +N/_g +E/_yy (ft) (ft) (ft) (ft) Comment 9,700.00 8,753.17 -1,416.34 -2,800.91 TIP 9,750.00 8,799.62 -1,419.39 -2,819.17 KOP 9,770.00 8,818.27 -1,420.57 -2,826.29 End of 9 Deg/100' DLS 9,805.77 8,852.77 -1,419.88 -2,835.39 4 9,827.81 8,874.45 -1,416.79 -2,837.76 5 9,847.74 8,894.03 -1,413.19 -2,837.43 6 9,865.64 8,911.60 -1,410.71 -2,$35.14 7 9,966.96 8,997.05 -1,385.29 -2,791.12 8 10,070.91 9,032.32 -1,337.49 -2,708.32 End of 38 Deg/100' DLS 10,221.00 9,033.60 -1,283.94 -2,568.78 10 10,411.00 9,035.14 -1,209.01 -2,395.55 11 10,561.00 9,035.86 -1,144.02 -2,261.04 12 10,781.00 9,036.26 -1,035.02 -2,072.18 13 10,931.00 9,037.73 -951.05 -1,948.64 14 11,081.00 9,041.98 -909.30 -1,805.27 15 11,206.00 9,045.89 -877.61 -1,684.79 16 11,396.00 9,050.26 -842.16 -1,499.45 17 ~I 11,606.00 9,053.49 -889.63 -1,296.65 18 11,740.00 9,054.62 -930.30 -1,169.43 19 11,965.00 9,056.40 -1,018.07 -964.52 20 12,124.99 9,057.55 -1,090.58 -822.75 TD at 12125.00 by Well G-16 -Slot 16 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc 23:16 9/24/1981 00:00 @ 77.10ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P I Checked By: Approved By: Date: I 4/28/2009 11:36:19AM Page 8 COMPASS 2003.16 Build 70 by Project: Prudhoe Ba AzimulM to Trve NoM Me nem n«m: zz 7a WELLBORE DETAILS: Plan 4, G-16A REFERENCE INFORMATION y Slle: PB G Pad p . Mepnelic Fieb Parent Wellbore: G-16 Coordinate (N/E) Reterll'm!G-16 - Sbt 16, Tme NoM WBII: G-76 Slronplh: s77os.a.n Tie on MD: 9700 00 Vertiral IND) Reference: 23:16 912411981 00:00 Q 77.108 (generic ddYing rg) Wellboni: Plen 4, G-16A ov AnpM- Bo.p2 . Section (VS) Reference: Sbt -16(O.OON, OOOE) Plen: Plen 4 (G-1&Plen 4, G-16A) Abae~~BGnGI7.Qro Measured Depth Reference: 23:16912411981 00:00 Q 77.10(1 (generic ddYing rg) Calalatbn Melhotl: Minimum Curvature WELL DETAILS: G-16 Ground Lever. 0.00 +N/-S +EI-W Northing Easting Latiltude Longitude Slol 0.00 0.00 5968213.00 657241.00 70° 19' 11.590 N 148° 43' 30.759 W 16 SECTION DETAILS ANNOTATIONS Sec MD Inc Azi ssTVD ~NI-S AEI-W DLeg TFace VSec Target Annotatbn 1 9700.00 21.42 260.52 8753.17 -1416.34 -2800.91 0.00 0.00 -3004.31 TIP 2 9750.00 22.04 260.55 8799.62 -1419.39 -2819.17 1.24 1.04 -3022.82 KOP 3 9770.00 20.24 260.55 8818.27 •1420.57 -2826.29 9.00 180.00 -3030.03 End of 9 Deg/100' DLS 4 9805.77 11.00 300.00 8852.78 -1419.88 •2635.39 38.00 148.95 -3038.87 4 5 9827.81 11.00 345.00 8874.45 •1416.79 -2637.76 38.00 112.13 •3040.67 5 6 9647.74 11.25 25.00 8894.03 -1413.19 -2837.43 38.00 107.87 -3039.72 6 7 9665.64 11.50 60.00 6911.60 -1410.71 -2835.14 38.00 105.17 -3037.04 7 8 9966.96 50.00 60.00 8997.05 •1385.29 -2791.12 38.00 0.00 -2989.27 8 9 10070.91 89.50 60.00 9032.32 -1337.49 -2706.33 38.00 0.00 •2899.43 End of 38 Deg1100' DLS 10 10221.00 69.52 78.01 9033.60 -1283.94 -2568.78 12.00 90.00 •2752.71 10 11 10411.00 89.56 55.21 9035.14 -1209.01 -2395.55 12.00 270.00 -2569.10 11 12 10561.00 89.89 73.21 9035.86 -1144.02 -2261.05 12.00 89.00 -2425.35 12 13 10781.00 89.90 46.81 9036.26 -1035.02 •2072.19 12.00 270.00 -2220.43 13 14 10931.00 88.98 64.79 9037.73 -951.05 -1948.65 12.00 93.00 -2084.19 14 15 11081.00 87.80 82.75 9041.98 -909.30 -1805.28 12.00 94.00 -1935.75 15 16 11206.00 88.65 67.77 9045.89 -877.61 -1684.79 12.00 273.00 -1611.59 16 17 11396.00 68.75 90.58 9050.26 -842.16 •1499.45 12.00 90.00 -1622.91 17 18 11606.00 89.51 115.77 9053.49 -889.63 •1296.65 12.00 88.50 -1431.43 18 19 11740.00 89.53 99.69 9054.62 •930.30 -1169.43 12.00 270.00 -1313.21 19 20 11965.00 89.58 126.69 9056.40 -1018.07 -964.53 12.00 90.00 •1126.66 20 21 12125.00 89.60 107.49 9057.55 -1090.59 -822.74 12.00 270.00 •999.62 TD t 12125.00 -3 -q -f Q - ~ -1 w O -g ...-U 'L~,-li '7O C-I. .~ _I, O ~-lf -21 a 8 ~ E 8 l~ `'~ F ~ N A ~ £ U N £ r f^ 1/24rtsel oo:oo ~ ~; '~ BAKER Yl1RYR~ u ~ a ua,t 0 i0 G- 6A Fa [ 2 i0 - G- ~a G 16A rget 2 6 Targ 3 i0 - - / of 3 Deg/ 00' D / )0 -- G- 6/G-1 / ~ ~ G- 6A T et 4 i / i 17 18 1 t ~ i - 6 / 1 5 I 19 2 - i I / R / 0 i 14 0 ~ G 16/Pla 4, G- i )U i ~~ 7 / 13 ~ 15 ~ ~ / i / / ~ ~ TD at 12 25.00 i0 I I~~ - )o a < ~` -- I I ~ ~ I TIP G-16 Tar 1 So _ ~---- - i K - P - - 70 kod i of-9- I -DLS- 4---- I 5 - -30 00 -28 50 -27 00 -25 50 -24 00 -22 50 -21 00 -19 50 -18 00 -16 50 -15 00 -13 50 -12 00 -10 50 -9 0U -7 50 -6 00 -450 -3( WPCtLI/Fact(+l (1 Sf) ft/inl l0 175 ----- -- i5 - - i25 ]0 _-_.. ._-.-- i ~ -TI i75 -- __ - rid of Deg/ ~~ , D I . 35 4 ~ 5 125 r 7 6 G-1 ' ---- A T t l G-1 - Targe 2 G 16A r et 3 B G 6A T eel 4 )0 _ 8 -_- _- - ~ G 16/Pl 4 G 6A )75 End - f 38 0 eg/1 - 'DLS 17 8 19 0 T _ _ at 1 a 125.00 , - IS -- - 1 - _..- eneri --- --~ I - - - - - - ~ -- 1 -- +,--_ , . , »~„ ~~~J ~•~V ~V'J ~VVV ~~~~ ~V~V ~I 'J _.__ _~_~ ~-~ - Vertical Section at 80.00° (75 ft/in) by A w O S ~7jO C- i ~_ 7 O Oft (generic drilli -3080 -3010 -2940 -2870 -2800 -2730 -2660 -2590 -2520 -2450 -2380 -2310 -2240 -2170 -2100 -203=19164(-=13fIa0 d 820 -1750 -1680 -1610 -1540 -1470 -1400 -1330 -1260 -1190 -1120 -1050 C$~7 74$40 -770 -700 -630 -560 -490 West(-)/East(+) (70 fdin) Project: Pr dhoe Ba , Azimulha to True NoM Ma riatic rbrm: zz ~a WELLBORE DETAILS: Plan 4, G-16A REFERENCE INFORMATION y u Sete: PB G Pad g . Map~ar r a Parent Wellbwe: G-16 CooNinate MIEI Reference: Well Gib -Slot 16, Tme North W811: G-16 Saenppr 9]os San Tie on MD: 9700 00 Vertial (7VD) Reference: 23 -. 16 9124/1981 00:00 ~ P.108 (generic dding rig) Yyellbore: Plan 4, G-16A ub Anple. eosz . Section (vs) Reference: Slof - is(O.oON, O.ooE) Plan: Plan 4 (G-78/Plan 4, G-78A) ~al~B~ ~ Meawretl DepN Reference: 23 16 9124/1981 00:00 @ 77.10fl (generic ddlhg rg) Calala8on Methotl: Minimum Curvature sa a~R ~ NU61lS 1NTEQ 0 _ ~ -7U - _ - m G-I A ~ o° ' aao ~ -11 -11 -10/ -10 _ _ no ~ G~l /G-I B ~ _ ~ ~ G- 1116 IIA - 89 zx -> ^ ~,a ~ -- __- _~- ~ OG - ~ ~ o - _ -350 L ~ ^ ~ O o G- 5/G- IS ~ ®® G I S/G I SA a' -49o I G- IS/G 156 - ~--- o -- -- _~ + J - -560 i ._.._ .~-- ~~__. . o -~ •~.o ---- - __. ~ 4a 0 ~- _ - ar ~ ~ o 0 -630 ~ o - o c - -----. _._. . II 0 0 0 -700 I - ) I O -770 - -_.. 0 -840 - ~O O •91 ~ 8~ -980 : I - I . ,9. - -- _. .. ~ 105 -_ .._-_- 8 / ~O _ / 1120 - l0 0 i 1190 - `~O 126 : - ~ ~~ O ~ ~ YQ 133 .. _--- ®~ ® ~_ ___ --_ __-_ _ ~.S ~ I a- I - - _. 140 .i .-. _. ~ ® ® ~ - 8 - i 6 ~ o si ® ~ ® Q 147 -- t o . o - _ - 8J 154 ~~ l / I O /t 161 o O G- 7/G- 7 6 I 168 Bp % 175 ~- - I--_. _ _.. . -19 -19 ~B~/ 1 rg-t 182 ng ri i 189 ~ • Protect: Prudhoe Bay ANTI-0OLLISION SETTINGS Site: PB G Pad ~'1 Well: G-16 In[arpdation Method: MD. interval: 25.00 n v + Depth Range From: 9700.00 To 12125.00 Results Limited By: Centre Distance: 1408.80 Wellbota: Plan 4, G-78A A Reference: Plan: Plan 4 )G-16/Plan 4, G-16A) COMPANY DETAILS NMII Amriu-MABNA-BP ~~~~ NORT ^AMERICA N n B I~ CMCWMian Ma1no4. mwn CwYUe Error sw«n. lscwsA f1FS son u.lw4 r gcm.r Rrn el ~nK Err« snmo . MYmirM Me4g4 rWbs BooeO 1NTEQ WELL DETAILS: G-i6 Ground Level: 0.00 +NI-S +E/-W Northing Easting Latittude Lonprtuda Slot Fran Cdwr TD MD 0.00 0.00 5968213.00 657241.00 70° 19' 11.590 N 148° 43' 30.759 W i6 SECTION DETAILS Sec IAD Inc Azl ND +W-5 +E/-W OLeg TFece VSec Targal I 9700.00 21.42 260.52 8753.17 -1416.31 -2800.91 0.00 0.00 -3001.31 t 3 9750.00 9770.00 Y2.0/ 20.21 260.55 260.55 8799.62 8818.27 -1419.38 -1420.57 -2819.17 1.24 1.04 -3022.82 -2826.29 9.00 180.00 -3030.03 1 9805.77 9827.81 11.00 11.00 300.00 345.00 8852.78 8874.45 -1419.88 -1416.79 -283538 38.00 148.95 -3038.87 -2837.76 38.00 112.13 -3010.67 9847.74 11.25 2500 8891.03 -1413.19 -283743 38.00 107.87 -3039.72 r 98fi5.fi4 11.50 6000 8911.60 -1410.71 -2835.14 38.00 105.17 -3037.04 3 9966.96 50.00 60.00 8997.05 -1385.29 -2781.12 38.00 0.00 -2989.27 3 10070.91 89.50 80.00 9032.32 -133749 -2708.33 38.00 0.00 -2899.13 10 10221.00 89.52 78.01 8033.60 -1283.94 -2568.78 12.00 90.00 -2752.]1 11 10411.00 89.56 55.21 9035.14 -1209.01 -2395.55 12.00 270.00 -15fi9.10 12 13 10561.00 10781.00 B9.~ 89.90 73.21 46.81 9035.86 9038.26 -1144.02 -1035.02 -2261.05 12.00 89.00 -2425.35 -2072.19 12.00 270.00 -2220.43 14 10931.00 88.98 64.79 9037.73 -951.05 -144865 12.00 93.00 -2081.19 IS 18 1108100 11206.00 B7.B0 88.65 82.75 67.77 9041.98 90/5.89 -909.30 -8]].61 -1805.28 12.00 91.00 -193575 -1684.79 12.00 273.00 -1811.59 17 11396.00 88.75 90.58 9050.26 -842.16 -1199.45 12.00 90.00 -1622.91 IB 11606.00 89.51 115.77 905349 -889.63 -1296.66 12.00 88.50 -143143 19 11740.00 89.53 98.69 8054.62 -930.30 -11fi4I3 12.00 270.00 -1313.21 t0 it 11965.00 12125.00 89.58 89.60 126.69 107.49 9056.40 9057.55 -1018.07 -1090.59 -961.53 12.00 90.00 -112866 -822.71 12.00 27000 -989.62 SURVEY PROGRAM Date: 2009-01-28700:00:00 Validated: Yes Version: Depth From Depth To SurveylPlan Tool 100.00 9700.00 1 : SperrySun BOSS gyro multBi661tiJGVRO 9700.00 12125.00 Plan 4 (Plan 4, G-1FA) MWD LEGEND G18, G76. Gt6 Vt ' G-04, GOIB, G-04B V4 G-01, GUIB. Pbn p3 V2 G-10, G10, G1D V5 G-10. G10A, G1G4 V1 • G-t 0. G10B. G10B V3 ° G-10. G10C. G40C V3 ~ G-it. G11, G11 V2 G~11, G11A, G-11A V3 « G-11, G118. G-118 V2 +G14. G14, G11 V1 G-14q, G-1M, G14A V1 G 15. G15, G-15 V1 G15, G-154, G-154 V1 G-15. GtSB. G-158 V2 Gt]. G1], G1] V! G-1 ), G1]A. Plan p5 V1 G~1B, G18, G18 V1 - G18A G18A, G1B4 V4 ~ G-18PPB1. GIBAPBI, GIBAPBI V2 G-19. Gt9, Gt9 V3 ~ G-19. G-19A. G~19A Vfi v G19. G19B. G-198 V16 G19, G19B, Plan bi3 V1 • G-2t, G2t, G2t Vt -~ G-21P81, G-21PBt, G21PB1 V1 cs], c-2]. Gn v1 - G~2]. G-2]A. G 2]A Vt G2), G2]A. Plan IYfi V6 G31, G31 B, G-318 VO » Plan 4 I 180 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Centre to Centre Separation [16 ft/in] ' r • ~~ ~~ ~~~~ ~~ INTEQ North America -ALASKA - BP Prudhoe Bay PB G Pad G-16 Plan 4, G-16A Plan 4 Travelling Cylinder Report 28 April, 2009 by ^, Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB G Pad Site Error: O.OOft Reference Well: G-16 Well Error. O.OOft Reference Wellbore Plan 4, G-16A Reference Design: Plan 4 BP Exploration Alaska • Travelling Cylinder Report bP :Local Co-ordinate Reference: Weil G-16 -Slot 16 TVD Reference: 23 ; 16 9/24/1981 00:00@ 77.10ft (generic drilling rig) MD Reference: 23:16 9/24/1981 00:00 @ 77.10ft (generic drilling rig) ;'; North Reference: True Survey Calculation Method: Minimum Curvature. Output errors are at 1.00 sigma Database: EDM .16 - Anc Prod - WH24P Offset TVD Reference: Offset Datum teference Plan 4_ _ ~ilter type: GLOBAL FILTER APPLIED: Ail wellpaths within 200'+ 100/1000 of refers nterpolation Method: MD Interval 25.OOft Error Model: ISCWSA )epth Range: 9,700.00 to 12,125.OOft Scan Method: Trav. Cylinder North tesults Limited by: Maximum center-center distance of 1,408.80ft Ertor Surface: Elliptical Conic Survey Tool Program Date 4/28/2009 From To (ft) (ft) Survey (Wellbore) Tooi Name Description 100.00 9,700.00 1 : Sperry-Sun BOSS gyro multi (G-16) BOSS-GYRO Spery-Sun BOSS gyro multishot 9,700.00 12,125.00 Plan 4 (Plan 4, G-16A) MWD MWD -Standard Casing Poitrts Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 12,125.00 9,057.55 2.375" 2.375 3.000 'Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well -Wellbore -Design (ft) (ft) (ft) (ft) PB G Pad G-03 - G-03A - G-03A 11,439.98 11,265.00 1,056.78 521.18 535.82 Pass -Major Risk G-10 - G-10 - G-10 10,834.41 9,900.00 490.69 921.86 -426.12 FAIL -Major Risk G-10 - G-10A - G-10A 11,475.00 9,600.00 575.21 648.75 13.14 Pass -Major Risk G-10 - G-10B - G-10B 11,250.00 10,475.00 786.12 800.15 -13.20 FAIL -Major Risk G-10 - G-10C - G-10C 11,750.00 9,900.00 564.96 644.83 -44.04 FAIL -Major Risk G-11 - G-11 - G-11 Out of range G-11 - G-11A - G-11A Out of range G-11 - G-11 B - G-11 B 9,860.00 10,875.00 1,318.67 1,115.40 439.66 Pass -Major Risk G-14 - G-14 - G-14 Out of range G-14A - G-14A - G-14A Out of range G-15 - G-15 - G-15 9,711.42 9,650.00 1,250.62 924.71 337.53 Pass -Major Risk G-15 - G-15A - G-15A 9,711.42 9,650.00 1,250.62 924.71 337.53 Pass -Major Risk G-15 - G-15B - G-156 9,711.82 9,650.00 1,257.52 921.76 350.24 Pass -Major Risk G-16 - G-16 - G-16 9,774.97 9,775.00 0.62 7.08 -2.47 FAIL -Major Risk G-19 - G-19 - G-19 Out of range G-19 - G-19A - G-19A Out of range G-19 - G-19B - G-198 9,870.00 13,692.00 604.89 630.68 115.77 Pass -Major Risk G-19 - G-19B -Plan #13 9,880.00 13,671.78 529.70 614.75 98.07 Pass -Major Risk G-21 - G-21 - G-21 9,927.58 11,075.00 758.91 648.77 126.01 Pass -Major Risk G-21 P61 - G-21 P61 - G-21 PB1 9,922.90 11,100.00 721.76 650.02 90.20 Pass -Major Risk G-27 - G-27A - G-27A 12,125.00 11,425.00 979.04 405.70 578.82 Pass -Major Risk G-27 - G-27A -Plan #6 12,125.00 11,475.00 1,038.80 405.60 638.43 Pass -Major Risk G-31 - G-31 B - G-31 B 11,550.00 11,061.00 1,080.68 406.63 678.08 Pass -Major Risk CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 4/28/2009 2:48:36PM Page 2 of 32 COMPASS 2003.16 Build 70 Alaska Department of Natr°~l Resources Land Administration Syste^, Page 1 ot~ ~~R~Alaska Mapper Land Records!Status Plats FE ;r~r,', ~ ~ cc<<,-I, ~t t ~;<=k in:. Natural ~leSOUrC~eS I____.__ Alaska DNR Case Summary File Type• ADL File Number 28280 ~ Printable Case File S_u_mmar~ See Township, Range, Section and Acreage? New search ~ Yes ~ No LAS Menu ~ Case Abstract I Case Detail ~ Land Abstract File: ADL 28280 .4~a"~' Sea_rc_h for Status Plat Updates As of 05/20/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 1 2 Case Type: 784_ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 013E Section: O1 Section Acres: 640 Search Plats Meridian: U Township: Ol 1N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: O11 N Range: 013E Section: 11 Section Acres: 640 A~leridian: U Township: O11N Range: 013E Section: 12 Section Acres: 640 Legal Description OS-28-1965 *** SALE NOTICE LEGAL DESCRIPTION *** C14- 91 TI1N, R13E, UM 1, 2, I1, 12 2,560.00 07-07-1987 *** LISBURNE PARTICIPATING AREA DESCRIPTION *** T. I1 N, R.13 E., U.M. SECTION 1: ALL 640 ACRES SECTION 12: ALL 640 ACRES http:/- dnr.alaska.gov/projects/las/Case_Summary.cfrn?FileType=ADL&FileNumbeY=2828... 5/20/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~,~L/ ~j - /6 PTD# ~~ 9 ~S"6 Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: f ~l~Q,~,~DE Ay POOL: ~tt~UD~O~' /~,9y ~/G Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1 /11 /2008 WELL PERMIT CH~CKL#ST Field & Pool PRUDHOE BAY, PRUDtiOE O1L-640150 PTD#:2090560 Company Ra EXPLORATION (ALASKA) INC Initial Class/Type Well Name: PRUDHOE BAY UNIT G•16A Program DEV Well bore seg ^ DEV 1 PEND GeoArea 890 Unit 11650 OnlOff Shore Qp. Annular Disposal ^ Administration 1 Pe[mitfeeattached-------------------------------------.---- NA-- ----------------.-- 2 lQesenumber,appropriate- ------- - -- --- - -- --- Y;3s ----- - - ----- - -------- ---- -- -- 3 Uniquewell_nameandpumber- - ----- - -- - -- ----- Yes -- ---- - ------ - -- --- --- - --- ----- -- - 4 Well located ina_definedp~l-- ---- - -- -- - -- - ---- Yes -- -- - -- ---- --- ----- - -- -- -- - -- -- -- -- 5 WelllocaiedproperdistanCef[om_drillinguniiboundar~----------------------- Yes- --------------------------------------------.--------------------------- 6 Welllocaiedp[opardistancefrom2therwells------------------------------ Yes- ----------------------------------------------------------------------- 7 Su_fficientecreageayailableindrillipgunjt__----------------------------- No_- ______256t)acres•---..-...____------_---.__--_------_--------- B If-deviated,is_wellboreplatipctuded---- -- -- ---- -------_ Yes ------ -- ---- - - -------- - -------- ----- - -- ----- 9 9peratoronryaffectedparfY----- - - - --- - -- ?'eS ----- -- -- - -------- -------- --- -- -- - ---- -- - 10 Opgratorhasapprppriate_bopdin_force_...-..--.._--------_---_--_-._ Yes- _---_6lanket@ond#61193--------------__--_---_-._-.---------...-------_--- 11 PemtiEcap pe lssUed without GOns@rYali4n Ord@r- - - - - - - - - - - Y~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ap~r Date 12 Peppit_capbeis9uedwithoutadministnative-approval------------------------- Yes- -----.---------------------------------------------------------------- ~ 1 13 Cap permit beaRRrovedbefore15-day-wait-- - -- - -- -- - ----- Yes ---- - -- ------ - ------- - - ------ --- - ----- ACS 512012009 14 Well located whhip area and strata euthonzed by_Ipjectiop Order ~ (put_IO# in comments)_(F4r_ NA- - - - - - - - - - - - - - - - - - - -- - - - - - 15 All wells withinll4_mileareaof[eviewidentifiec}(Forservicewelloply)-_________._- NA-- --------------_.--..--..--______.-_---_.._-_------.-_---------------- 16 Pre-produced injector, duration of pre production less-than3months_(Forservicewe4only)._ NA- -__------------------------------------__-.-----_--__-------.-__-____- 1 17 Nopconven. gas cpnforms to A$31,05:030Q.1.A),G:2_.A-DI - NA - - 1 18 Conductor string provided _ NA Conductor set in G 16 (181-122) - Engineerm9 1 19 Surface casing protects all known_ USDWs - . NA_ _ _ _ _ _ . -Aquifers exempted, AEO1._ , 20 CMT-votadequate_tgcirculate onconductor_&surf-csg________________________ NA__ -_____Surfacecasingset in_G-16.-.-__________--.-.____---.-_.--_----__._.--_--__ ', 21 CMT_votadequate_tQiie-inlongstringtosurfcsg .........................__ NA_ _---__Production-easingsel inG-16.___.________--._.---_---_.--------__._--.-__ X 22 CMT.wiIICOVer_allkpownproduciivehorizons__-------------------- - -- Yes- ------------------------------------- -----.------------------------- -- 1 23 Casing designs adequate far C,T,B&-permafrost---------- ----- ---------- Yes- .-----------.------------------------------- ---------- ---------------- ~ 24 Adequate tankage_or reserve pit _ _ - - _ _ Yes . - - .. Rig equipped with steel pits. No reserve pit planned._ All_ waste_to approved disposal well(s). - - 25 Ifa_rQ-drill,has_a10-403 forabandon_mentbeenapproved..-__________________ Yes_ ___-.309.165____._-.-_- ________--..__--_--____-._----_--_- .-.-___--_.--. 26 Adequate wellbore- separationproposed _ - Yes . - Proximfl -anal sis perfo[med, Nearest segment is P$A pcrtion_ of G-1.6.and paths diver e. . _ Y Y 9 ' 27 Ifdiverterrequired,doesitmeetregulatiops_-..-__-.--. __----.______ NA__ ______BOPStack_willalr_eddy-beip place,_______--.._-__-_-_-_-.-----__-- ----------- Appr Date 28 Drillipgfluid-program schematic & equip list adequate_ _ .. _ - - . - _ - Yes . - - - - -Maximum expecied formation pressure 8,0_EMW._ MW plapned 8.6 pqg. TEM 512012009 129 BOPES,_do they meet regulatiop - - - - Yes - - - / ' 30 ROPE-press rating appropriaie; test to_(put psig in-comments)_ _ _ __ _ __ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - . - - - - MASP calculated at 2742 psi._ 3500_psi_BOP testplanned: _ - _ _ - _ _ _ - - _ _ _ _ . _ _ - - - - - - - _ _ _ _ . - _ - - (J/°~ 31 Choke-manifold comRlies w/API_RP-53 (May 84)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ Yes _ _ , _ _ _ _ _ _ _ . - 32 Workvnlloccurwithoutoperationshutdown___------------------------- Yes- ------------------------------------------------------------------.-.-- 33 Is presence_of H2S gas_ probable - - . - - Yes H2$ is reported at G-pad.- Mud_ should pr_eclude_H2S on rig._ Rig has sensors and_alarms._ - . - - - - ',34 Mechanical condition of wellswhhinAORverified(For_servicewelloply)___-----_____ NA__ _______________________________________-_--__.---.-_-__--_-.--.._--____ ~ 35 Permit cap ba issued wlo hydrogen_sulfidemeasunes - - No Max level H2S on well G-1DC was 40ppm (11!01147). _ Geology 36 Data_presented on_ poiential everpressure zones NA - Appr Date 37 Seismic analysis of shallow gas zopes- - - - - - - - NA - - - - - ACS 512012009 38 Seabedconditiopsurvey_(ifoff-shore)-------------------------------- ldA_ _____..-.____.--_-__------.___-------------------------- ~i,39 Coptact namelphone for weekly_progress reports. [exploratory oply] .. _ _ _ _ _ _ _ _ _ No- - - _ _ - _ Greg Sarber - 564.4330, _ - - - - - - _ _ - - - - - - -- - - -- - - - - - - - - - - -- - - _ _ _ _ _ - _ - - .. _ _ _ _ _ Geologic Commissio er: ~ Engineering Public Date: Commissioner: Date Commissioner Date ~ JJC Sa 11--5 o ~~ U Well History File APPENDIX Information of detailed nature that is not • particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efforl has been made to chronologically organize this category of information. C tapescan.txt '~*** REEL HEADER '~'~'~* MWD 09/08/27 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/06/16 2645025 Ol 2.375" CTK *** LIS COMMENT RECORD **'~ Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. MO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 9356.5000: Starting Depth STOP.FT 11456.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: G-16A FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 11.590"N 149 deg 43' 30.759"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 16 )un 2009 API API NUMBER: 500292064301 Parameter Information Block #MNEM.UNIT Value Description SECT. 24 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 77.1 Feet Above Perm. Datum DMF DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 77.1 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OSl DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to lob this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) tog provided by Schlumberger GR CNL dated 18 Tun 2009 per Roger Sels with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from G-16 through a milled window in a 7 inch liner. Top of window 9751.6 ft.MD (8724.3 ftoTVDSS) Bottom of window 9756.6 ft.MD (8729.0 ft.TVDSS) (9) Tied to G-16A at 9700 feet MD (8676.1 feet TvDSS). (10) The interval from 11432 feet to 11463 feet MD (8968.6 feet to 8970.5 feet TvDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API Units) ROP~4VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (OHMM) TVDSS CURVE SHIF BASELINE, 9358.95, 9363.71, 9366.36, 9367.94, 9369.71, 9372.35, 9373.94, 9374.82, 9376.58, 9378.53, 9396.69, 9397.93, 9405.33, 9409.74, 9411.68, 9415.21, 9417.33, 9422.26, 9424.03, 9425.97, 9431.08, 9432.85, 9436.37, 9439.37, 9441.66, 9444.82, 9450.11, 9454.17, 9457.52, 9460.17, 9461.4, 9462.63, 9465.46, 9469.16, 9471.1, 9473.75, 9479.21, 9485.03, 9488.56, 9490.85, 9492.79, 9747.59, 9751.82, -> True vertical Depth (Subsea) T DATA MEASURED, DISPLACEMENT 9358.24, ! -0.706055 9362.48, ! -1.23535 9365.3, ! -1.05859 9366.88, ! -1.05859 9368.47, ! -1.23438 9371.47, ! -0.881836 9372.88, ! -1.05762 9373.76, ! -1.05762 9375.7, ! -0.881836 9377.47, ! -1.05859 9394.4, ! -2.29297 9396.16, ! -1.76367 9405.51, ! 0.176758 9408.86, ! -0.881836 9411.15, ! -0.529297 9414.5, ! -0.706055 9417.68, ! 0.352539 9420.32, ! -1.94043 9423.15, ! -0.881836 9424.73, ! -1.23438 9429.32, ! -1.76367 9431.79, ! -1.05762 9435.49, ! -0.881836 9437.96, ! -1.41113 9441.14, ! -0.52832 9444.29, ! -0.52832 9448, ! -2.11621 9452.93, ! -1.23438 9455.58, ! -1.94043 9458.4, ! -1.76367 9459.81, ! -1.58789 9461.58, ! -1.05859 9464.05, ! -1.41016 9467.75, ! -1.41113 9469.51, ! -1.58789 9472.16, ! -1.58789 9477.63, ! -1.58691 9483.62, ! -1.41113 9486.8, ! -1.76367 9489.79, ! -1.05859 9491.03, ! -1.76367 9746.53, ! -1.05859 9749.88, ! -1.93945 Page 9755.17, 9753.06, 9756.41, 9754.29, 9757.82, 9756.23, 9769.46, 9766.29, 9773.69, 9771.22, 9775.63, 9773.69, 9780.75, 9779.69, 9783.75, 9781.63, 9788.16, 9785.69, 9794.5, 9792.56, 9797.68, 9795.56, 9800.85, 9798.74, 9804.38, 9801.21, 9811.96, 9810.02, 9817.43, 9815.49, 9819.2, 9817.25, 9821.49, 9819.2, 9822.55, 9820.43, 9823.25, 9822.19, 9829.34, 9827.93, 9831.28, 9829.87, 9836.92, 9834.98, 9839.04, 9837.98, 9846.09, 9844.86, 9851.91, 9850.68, 9853.67, 9853.32, 9858.97, 9857.03, 9860.2, 9858.97, 9865.14, 9863.38, 9867.96, 9866.9, 9870.61, 9869.37, 9878.1, 9878.1, 9880.75, 9881.63, 9888.33, 9886.74, 9897.15, 9895.39, 9903.32, 9901.91, 9916.87, 9915.1, 9919.69, 9917.57, 9922.86, 9921.1, 9932.04, 9931.33, 9933.62, 9933.62, 9940.15, 9938.91, 9944.03, 9942.09, 9946.32, 9945.44, 9948.61, 9947.56, 9950.2, 9948.97, 9957.61, 9956.2, 9960.47, 9959.76, 9963.29, 9962.41, 9967.52, 9965.4, 9969.81, 9966.81, 9974.57, 9973.16, 9977.57, 9975.,1, 9983.22, 9980.39, 9985.16, 9982.33, 9987.1, 9984.98, 9989.04, 9986.92, 9996.8, 9995.03, 9999.27, 9996.97, 10001.9, 10000.3, 10010, 10008.6, 10020.3, 10017.5, 10024.6, 10021.9, 10035.3, 10030.7, 10039.9, 10036, 10043.6, 10040.1, 10050.7, 10047, 10053, 10050.1, 10056.2, 10053, 10059, 10056.7, tapescan.txt ! -2.11719 ! -2.11621 ! -1.58789 -3.1748 ! -2.46973 ! -1.93945 ! -1.05762 ! -2.11719 ! -2.46973 ! -1.93945 ! -2.11621 ! -2.11621 ! -3.1748 ! -1.93945 ! -1.94043 ! -1.94043 ! -2.29297 ! -2.11621 ! -1.05859 ! -1.41113 ! -1.41113 ! -1.93945 ! -1.05859 ! -1.23535 ! -1.23438 ! -0.352539 ! -1.93945 -1.23438 ! -1.76367 ! -1.05859 ! -1.23438 ! 0 ! 0.881836 ! -1.58691 ! -1.76367 ! -1.41113 ! -1.76367 -2.11621 ! -1.76367 ! -0.706055 -1.23438 -1.94043 -0.881836 -1.05762 -1.23438 -1.41113 -0.706055 -0.881836 -2.11719 -2.99805 -1.41016 -2.46973 -2.82227 -2.82129 -2.11621 -2.11719 -1.76367 -2.29199 -1.58691 -1.41113 -2.82129 -2.64453 -4.58594 -3.88086 -3.52734 -3.70312 -2.82227 -3.1748 -2.29297 Page 3 10062, 10060.6, 10065.2, 10062.7, 10067.1, 10064.9, 10077.6, 10072.6, 10083.2, 10078.4, 10095.9, 10091.5, 10152.9, 10150.6, 10169.4,_10166.1, 10172.3, 10169.3, 10174.9, 10171.7, 10180.4, 10176.8, 10183.9, 10181.3, 10189, 10187.4, 10190.8, 10188.8, 10194.2, 10192.4, 10196.1, 10194.9, 10197.5, 10196.6, 10200 5, 10199.5, 10203, 10200.5, 10205.8, 10203.3, 10207.7, 10205.1, 10209.9, 10207.4, 10215.2, 10213.2, 10217.8, 10215.7, 10220.4, 10218.2, 10227.3, 10224.9, 10240.9, 10238.5, 10244.5, 10241.6, 10250.6, 10248, 10254.3, 10252.2, 10263, 10261.4, 10267.6, 10266.3, 10273, 10269.5, 10279.2, 10276.9, 10283.2, 10281.2, 10289.5, 10287.7, 10292.7, 10291.1, 10294.1, 10293, 10299, 10296.9, 10466.6, 10464.6, 10469.6, 10467.8, 10471, 10470.1, 10474.7, 10473.3, 10481.6, 10480, 10491.1, 10487.9, 10497, 10493.7, 10504.5, 10501.3, 10507.6, 10504.1, 10527.8, 10524.3, 10535.4, 10532.2, 10539.1, 10535.6, 10542.8, 10539.6, 10550.4, 10546.9, 10552.7, 10549.2, 10555.3, 10551.3, 10569.3, 10565.9, 10574.6, 10570.5, 10579.7, 10575.3, 10619.2, 10613.9, 10623.1, 10617.3, 10629.1, 10626.4, 10630, 10628.2, 10633.1, 10630.3, 10639.3, 10635.1, 10641.8, 10637.4, 10644.6, 10640.7, 10648.9, 10646.3, 10658.3, 10655.3, 10687.7, 10684.6, .10689.5, 10686.5, r: tapescan.txt ! -1.41113 ! -2.46973 ! -2.29297 ! -4.93848 ! -4.76172 ! -4.40918 ! -2.29297 ! -3.35059 ! -2.99902 ! -3.1748 ! -3.52734 ! -2.64551 ! -1.58691 ! -1.93945 ! -1.76367 ! -1.23438 -0.881836 ! -1.05859 ! -2.46875 ! -2.46973 ! -2.64551 ! -2.46875 ! -1.93945 ! -2.11621 ! -2.29199 ! -2.46875 ! -2.46875 ! -2.82227 ! -2.64551 ! -2.11719 ! -1.58691 ! -1.23535 ! -3.52734 ! -2.29297 ! -1.94043 ! -1.76367 ! -1.58691 ! -1.05859 ! -2.11719 ! -1.93945 ! -1.76367 ! -0.881836 ! -1.41113 ! -1.58691 ! -3.17383 ! -3.35059 ! -3.1748 ! -3.52734 ! -3.52734 ! -3.17383 ! -3.52734 ! -3.1748 ! -3.52734 -3.52734 ! -4.05664 ! -3.35059 ! -4.05566 ! -4.40918 ! -5.29102 ! -5.81934 ! -2.64551 ! -1.76367 ! -2.82227 ! -4.23242 ! -4.40918 -3.87988 ! -2.64551 ! -2.99805 ! -3.1748 ! -2.99805 Page 4 tapescan.txt 10696.5, 10693.4, ! -3.1748 10705.4, 10705.1, ! -0.352539 10711.6, 10708.9, ! -2.64551 10721.3, 10717.6, ! -3.70312 10738.4, 10735.6, ! -2.82129 10805.6, 10802.6, ! -2.99805 10808.7, 10806.4, ! -2.29297 10839, 10835.5, ! -3.52734 10844.5, 10841.5, ! -2.99805 10850.2, 10845.8, ! -4.40918 10853.7, 10850.7, ! -2.99902 10865.3, 10861.8, ! -3.52734 10871.2, 10868.2, ! -2.99805 10878.8, 10877.2, ! -1.58789 10891.5, 10886.5, ! -4.93848 10909.1, 10906.5, ! -2.64551 10918.8, 10916, ! -2.82227 10955.2, 10951.1, ! -4.05566 10959.4, 10955.5, ! -3.87988 11025.9, 11024.5, ! -1.41113 11030.1, 11027.6, ! -2.46875 11032, 11030.6, ! -1.41113 11034.1, 11033.9, ! -0.176758 11035, 11035.4, ! 0.352539 11039.4, 11040.3, ! 0.881836 11049.3, 11048, ! -1.23535 11054.2, 11052.3, ! -1.93945 11058.6, 11056.3, ! -2.29297 11064.3, 11060.9, ! -3.35059 11065.3, 11062.5, ! -2.82227 11071.7, 11067.8, !" -3.88086 11082.3, 11077.3, ! -4.93848 11093.6, 11090, ! -3.52734 11096.9, 11094.1, ! -2.82129 11101.3, 11098.8, ! -2.46875 11109.6, 11106, ! -3.52734 11133.2, 11129.7, ! -3.52734 11142.1, 11137.9, ! -4.23242 11146.7, 11144, ! -2.64551 11201.8, 11197.2, ! -4.58594 11208.5, 11201.8, ! -6.70215 11215.9, 11209.2, ! -6.70215 11221, 11216.1, ! -4.9375 11235.5, 11233.9, ! -1.58691 11253.4, 11249.2, ! -4.2334 11263.1, 11258.9, ! -4.2334 11285.9, 11285, ! -0.881836 11320.8, 11318.2, ! -2.64551 11324.3, 11321.7, ! -2.64551 11358.3, 11357.1, ! -1.23438 11397.5, 11391.3, ! -6.17285 11413.2, 11406.5, ! -6.70215 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 310 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 Page 5 • tapescan.txt *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 18 ]un 2009 per Roger Sels with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Lod Depth Scale units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 one depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 51 Tape File Start Depth = 9356.500000 Tape File End Depth = 11456.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 60 records... Minimum record length: 18 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MwD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Page 6 s • tapescan.txt Datum Frame Size is: 12 bytes Loggin direction is down (value= 255) optical Lod Depth scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 one depth per frame (value= 0) Datum specification Block sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 101 Tape File Start Depth = 9357.000000 Tape File End Depth = 11463.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet ~'~** FILE TRAILER *'~~`* Tape subfile: 3 110 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes ~''`~~` TAPE TRAILER '~~~* MWD 09/06/16 2645025 O1 '~**'~ REEL TRAILER *~** MWD 09/08/27 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Page 7 ! • 0 Tape subfile 1 is type: LIs 0 Tape subfile 2 is type: LIs tapescan.txt DEPTH GR ROP 9356.5000 -999.2500 -999.2500 9357.0000 71.3276 -999.2500 9400.0000 40.8256 -999.2500 9500.0000 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 22.6314 60.5490 9900.0000 27.0897 67.8820 10000.0000 39.5124 58.3850 10100.0000 90.4330 31.7197 10200.0000 99.8000 38.1000 10300.0000 28.1497 49.4715 10400.0000 27.5695 90.5074 10500.0000 28.4524 100.3381 10600.0000 29.5096 94.2759 10700.0000 51.5166 92.7585 10800.0000 47.5325 109.8062 10900.0000 35.0708 101.1076 11000.0000 33.1848 97.4239 11100.0000 161.1718 45.3873 11200.0000 66.1808 128.4166 11300.0000 73.3724 81.3017 11400.0000 51.7817 94.9918 11456.5000 -999.2500 -999.2500 Tape File Start Depth = 9356.500000 Tape File End Depth = 11456.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet D Tape subfile 3 is type: LIs DEPTH GR ROP 9357.0000 -999.2500 -999.2500 9357.2500 -999.2500 -999.2500 9400.0000 41.7000 -999.2500 9500.0000 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 9700.0000 -999.2500 -999.2500 9800.0000 19.9000 62.5000 9900.0000 25.0000 39.2000 10000.0000 50.4000 57.5000 10100.0000 95.2000 33.8000 10200.0000 122.0000 32.9000 10300.0000 29.2000 40.4000 10400.0000 25.1000 93.1000 10500.0000 29.6000 93.4000 10600.0000 27.9000 94.2000 10700.0000 47.5000 89.5000 10800.0000 50.3000 100.7000 10900.0000 32.8000 100.9000 11000.0000 30.4000 96.8000 11100.0000 191.8000 64.4000 11200.0000 49.0000 126.1000 11300.0000 74.5000 82.0000 11400.0000 51.5000 108.1000 11463.0000 -999.2500 -999.2500 Tape File start De th = 9357.000000 Tape File End Depth = 11463.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet Page 8 tapescan.txt Tape 5ubfile 4 is type: LIS Page 9