Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout208-107 •
• • pT0 � 11I
Loepp, Victoria T (DOA)
From: Long,William R <William.R.Long@conocophillips.com>
Sent: Monday, March 26,2018 2:25 PM
To: Loepp,Victoria T(DOA)
Subject: RE: [EXTERNAL]Re: New Window for CD2-463L1-01
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
Thank you for your help with this. I really appreciate you taking care of it so quickly.
Thanks,
William
From: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>
Sent: Monday, March 26,2018 1:58 PM
To: Long,William R<William.R.Long@conocophillips.com> SCAM
Subject: Re: [EXTERNAL]Re: New Window for CD2-463L1-01
William,
Approval is granted for the revised kickoff point as outlined below. Please include this approval with the approved PTD.
Thanx,
Victoria
Sent from my iPhone
On Mar 26, 2018,at 12:55 PM, Long,William R<William.R.Long@conocophillips.com>wrote:
Victoria,
Please find attached the original and updated schematics. Please let me know if you would like any
additional information.
Thanks,
William R. Long
Staff CTD Engineer
ConocoPhillips
907-263-4372(office)
281-723-6000(cell)
William.R.Long@ConocoPhillips.com
1
• •
From: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>
Sent: Monday, March 26,2018 12:19 PM
To: Long,William R<William.R.Long@conocophillips.com>
Subject: [EXTERNAL)Re: New Window for CD2-463L1-01
Your second schematic is not quite right. Please revise and I'll review.
Sent from my iPhone
On Mar 26,2018,at 11:20 AM, Long,William R<William.R.Long@conocophillips.com>wrote:
Victoria,
We are currently working on a CTD project in CRU CD2-463 with Nabors CDR3-AC. Last
night while running liner in the CD2-463L1(218-023) lateral,the top of the liner became
stuck across the window. Our original plan was for the CD2-463L1-01(218-024) lateral
to kick off from the CD2-463L1 lateral. Since the kick off point is obstructed,we plan to
move up hole approximately 40'and mill a new window to kick off from the original
CD2-463 wellbore. I have attached an illustration of the original plan and the planned
change.
The new planned kick off point is within 500'of the original kick off point. The primary
well branch for the entire project will remain the original wellbore.
Is any formal notification or approval required for this change?
Thanks,
William R. Long
Staff CID Engineer
ConocoPhillips
907-263-4372(office)
281-723-6000(cell)
William.R.Long@ConocoPhillips.com
<CD2-463L1-01 New Window.pdf>
<CD2-463 Proposed CTD Schematic 26-Mar-2018.pdf>
<CD2-463 Proposed CTD Schematic.pdf>
2
.
Mc 0
4 .
00
CO000
ti ,; CO.-m
M III III 1 '� O
e- III III I .. VI-i)7
/;a� ill III
�J !it III i, ' ON
O It III l,i. 300
O
a.
L I! 11
O III III
L O O 4
N 11: ill J<0 CO
Jit III O OCO—
N 3 �o O
tV r`" N 111 V F-F
co M (O II(
nj CO II:
❑ ❑ E III ri ' NI ''
EL III III ';
v ❑ m O III III a: N 0
pp CO Ym Y Ili m ;; a; 002
Y m m Y I� ^ Y ❑Q n+ m 1 L.2 0
CO N Cr Lt- C\I II II 1 i v
CD r, O ❑ N�, mp�jp nI III a� 'i m��
U9N N p m p Y ce �., u! 01 I m
v radin CV nI NI 0 a 0 0 s
O O @1 N ° \J� m Lp w 31 ; 1 C V 1-co
V r` co Nal)p Y Y III lu
Y coco @o L Y N fl.In la III
IX Lt V O) !n III
o) g M Co co Z o o ❑ ul III 0
o m to c 0 t) to m nl....„ 0
b1.0 O _ co N //(,�0�� (n O C L.J� O III 9 �
in
N O L.J (X U)' =O O 4f) III N O Co
E2 v C7 _. a) �n m u 0 X X ,,,
III m
�w- x r2 Gr' O_ p m J N N 0. III N @_I
W m E ZLO Ja x p IIIk
r o00
1=C W F- Y d Z Ud R'to N v c%) Y nl m v I-r
0 0 =�tixx
N N N Y W N 4"1".`4 N --
N CO W J �c�e�c
c>ri M U U m 2 mmma)4
t o
t
/ o
co
J
2
cri
/c�� N 4
A /tb/....„N• , (, au —
,Ti5 LO
o cu 1 /
U /�
-a 1. fi / /
o
0
CL f
a
M
I
N
0
U
J in
s.P N
str
Lf)w'' :.-1. O
0 O M Lfn
O❑ 0
•
4110 •
Original Plan CD2-463
CD2-463L1
CD2-463L1-01
-*"..107 -''.----------- .'-'---.'-----
8705'MD
8625'MD
Current Plan (26-Mar-2018)
CD2-463
CD2-463L1
CD2-463L1-01
'.\
8625'MD
8585'MD
REV DATE BYI
CK JAPPI DESCRIPTION
IREVI
DATE BY CK APP DESCRIPTION
1 4/18/07 CZ
DB C.A. ISSUED PER K07041ACS
2
4/21/08 CZ GD C.A. UPDATED PER K080010ACS
CD2
G
CD2 ACCESS ROAD
S F�
o N PNS
W
PIN
LOCATION OF
a�
THIS SURVEY
= DRILL
JECT
ITE CD-
r
T12
T1
N
O
IOIF
Z
2
D
ALPINE SATELLITE DEVELOPMENT
VICINITY MAP NOT TO SCALE
ASPC
N
PLANT
4 a
06 013'45"�
N
LCMF
1
CD -2 B
-
PAD a� Uj
w
3
� o
6 U)
Lo
Loo
QANNIK
CONDUCTORS a
(TYP.)
• • • tND! �o"a O—aomxon
U
Q Q p U Q U U U U U
U U U
SHOULDER QANNIK PAD
DESIGN
LEGEND:
KU U KP I K OPROPOSED CONDUCTOR
LCME, • EXISTING CONDUCTOR
139E.51VAve. Anchon3ge,NmW 80503-(807)273-1830
(907)6]0-6739
Alpine Survey Office
ALPINE MODULE: CD20 UNIT: QNK
ConocePhillips
ALPINE PROJECT
QANNIK WELL CONDUCTORS
Alaska, Inc.
AS—BUILT LOCATIONS
CADD FILE NO.
DRAWING NO:
PART:
REV:
07-02-18-1
4/1/07
CE—CD20-139
1 of 3
2
IRFVI DATE I BY CK APP I DESCRIPTION I REV I DATE I BY I CK I APP DESCRIPTION
1 4/18/07 1 CZ DB I C.A. ISSUED PER K07041ACS 1 2 1 4/21/08 CZ GD C.A. UPDATED PER K080010ACS
ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC.2, T 11 N, R 4 E, U.M.
SEC.LINE 0/S EXIST
WELL 'Y' X' LAT.(N) LONG.(W) FSL FEL GND PAD
CD2 -461
5,973,927.48
1511501.61
70' 20'
14.465
151' 02'
45.814
3099'
1765
8.3
15.7
CD2 -462
5,973,925.28
1,511,481.66
70° 20'
14.440"
151° 02'
46.395"
3096'
1785'
8.3
15.7
CD2 -463
5,973,923.32
1,511,461.85
70° 20'
14.417"
151° 02'
46.973"
3094'
1805'
8.3
15.7
CD2 -464
5,973,921.12
1511442.08
70' 20'
14.392"
151 ° 02'
47.549"
3091'
1825'
8.3
15.7
CD2 -465
5,973,919.18
1 511 422.01
70' 20'
14.370
151 ° 02
48.134
3089'
1845'
7.8
15.7
CD2 -466
5,973,916.76
1,511,402.40
70° 20'
14.343"
151° 02'
48.706"
3086'
1864'
7.8
15.7
CD2 -467
5,973,915.01
1511382.20
70' 20'
14.322"
151 ° 02'
49.295"
3084'
1884'
7.9
15.7
CD2 -468
5,973,912.62
1 511 362.41
70' 20'
14.295"
151' 02'
49.872"
3081'
1904'
7.9
15.6
CD2 -469
5,973,910.54
1 511 342.61
70° 20
14.271 '
151 ° 02
50.449
3079'
1924
8.0
15.6
CD2 -470
5,973,908.62
1,511,322.72
70° 20'
14.249'
151° 02'
51.029
3077'
1944
8.0
15.6
CD2 -471
5,973,906.3
1,511,302.77
70° 20'
14.224"
151' 02'
51.610"
3074'
1964
8.1
15.6
CD2 -72
5,973,904.22
1511 282.90
70' 20
14.199
151° 02'
52.189'
3072'
1984'
8.1
15.6
CD2 -73
5,973,902.15
1,511,262.95
70' 20
14.175
151° 02
52.771
3069
2003
8.2
15.6
CD2 -74
5,973,899.86
1,511,243.06
70° 20'
14.150"
151° 02'
53.351"
3067'
2023'
8.3
15.6
CD2 -75
5,973,897.83
1511223.26
70° 20'
14.126"
151' 02'
53.928"
3064'
2043'
8.4
15.6
CD2 -x76
5,793,895.84
1 511 203.39
70' 20'
14.103"
151 ° 02'
54.507"
3062'
2063'
8.4
15.6
CD2 -x77
5,973,893.62
1,511,183.28
70° 20
14.078
151° 02
55.094
3059
2083
8.4
15.6
CD2 -x78
5,973,891.6
1,511,163.81
70' 20'
14.055"
151' 02'
55.661 '
3057'
2103'
8.4
15.6
NOTES:
1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.)
KUUKPIK
�' :MFuz
N0.90
(9o))Bi39
Alpine Survey Office
,-� ALPINE MODULE:CD20 UNIT: QNK
ConocePhillip5 ALPINE PROJECT
QANNIK WELL CONDUCTORS
Alaska, Inc. AS -BUILT LOCATIONS
CADD FILE NO. DRAWING NO:REV:
PART:
07 02-18-1 4/2/07 CE CD20-139 2 OF 3 2
REVI DATE IBYICKIAPPI DESCRIPTION IREVIDATE 18YI CKIAPPI DESCRIPTION
1 4/18/07 1 CZ DB I C.A. ISSUED PER K07041ACS 1 2 4/21/08 1 CZ GD I C.A. UPDATED PER K080010ACS
NOTES:
1. ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 83.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL.
ORIGINAL GROUND ELEVATIONS WERE DERIVED FROM THE AVERAGE ELEVATION
ALONG THE TOE OF THE QANNIK GRAVEL PAD.
3. BASIS OF COORDINATES: ALPINE TO CD-5 ROAD MONUMENTS PER
SURVEY BY KUUKPIK/LCMF, APRIL 2007.
4. DATES OF AS—BUILT SURVEYS: WELL CONDUCTORS CD2-461, CD2-462, CD2-463,
CD2-464, 3/30/07, FB 2007-08 PGS. 2-3; CD2-465, CD2-466, CD2-467,
CD2-468, CD2-469, CD2-470, CD2-471 & CD2-72, 4/16/07, LCMF2007-09,
PGS. 22-24; CD2-73, CD2-74, CD2-75, CD2—x76, CD2—x77 & CD2—x78,
4/20/08, FB 2008-8, PGS 72-75.
SURVEYOR'S CERTIFICATE
14 1 HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED
4@* � �♦ AS—BTO U ILT I REPRESENTSACTICE LAND RAESING IN THE URVEY MADE BY STATE SKA, THAT THIS
M�FOR�UNDER MY DIRECT
...OF,.qtgS
G;.•'••• ••'•.9
SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST
AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE
Al
*:�• *�.
';
49th CORRECT.
,,.....,
% """"""""""""""""
� �DATE: REGISTRATION N0. LS-5077
................................................
0
�. �c'�• Donald G. Bruce �' o
No.. LS-5077
AVR...
�♦.�� PFS
p CO KUUKPIK
LCMFLLe
13Alpine
139a 519Aw • Ancnomp, A1wlo, 99503 - (907)Z73-1830
Alp,Office (99])67p 739
Survey Office
�.�
ALPINE MODULE:CD20 UNIT: CD
CenocePhillips
ALPINE PROJECT
QANNIK WELL CONDUCTORS
Alaska, Inc.
AS—BUILT LOCATIONS
CADD FILE NO.
07-02-18-1 4/2/07
DRAWING NO:
CE-CD20-139
PART:
3 OF 3
REV:
2