Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-062
STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIS • WELL4IAMPLETION OR RECOMPLETION REPO AND LOG la. Well Status: Oil ❑ Gas ❑ SPLUG 0 Other 0 Abandoned Ed • Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development B Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL ❑ No.of Completions: Zero Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 8/27/2017 210-062 • 317-328 3. Address: 7. Date Spudded: 15 API Number: P.O.Box 196612 Anchorage,AK 99519-6612 7/5/2010 50-029-22462-02-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 7/15/2010 PBU 15-32B ' Surface: 1676'FNL,333'FWL,Sec.22,T11N,R14E,UM • 9 Ref Elevations KB 70.50 • 17. Field/Pool(s): Top of Productive Interval: 1779'FNL,542'FWL,Sec.22,T11N,R14E,UM GL 33.30 ' BF 35.22 PRUDHOE BAY,PRUDHOE OIL • Total Depth: 711'FSL,12'FEL,Sec.16,T1 N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 8535'/8513' ADL 028306 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MDlTVD): 19. DNR Approval Number: Surface:x- 676277' y- 5959813 ' Zone - ASP 4 • 11624'/8816' • 78-084 TPI: x- 676488 y- 5959715 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 675871 y- 5962191 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No RI 13. Water Depth,if Offshore: 21. Re-drillLateral Top Window MDITVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) - 8687'/8643' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 MC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD,GR,ROP,PRESS,RES,MCNL,MEMORY GR,CCL SCANNED JAN 2 6 2018 18 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 38' 118' 38' 118' 30" 260 sx Arctic Set(Approx.) 13-3/8" 68# L-80 38' 3533' 38' 3532' 16" 1170 sx Permafrost'E',375 sx Class'G' 9-5/8" 47# 1-80 35' 8330' 35' 8322' 12-1/4" 610 sx Class'G' 7" 26# L-80113cr80 8165' 8687' 8161' 8643' 8-1/2" 280 sx Class'G' 3-1/2"x3-3/16" 9.3#/6.2 L$0 8592' 11624' 8563' 8816' 4-1/8" 165 sx Clas'G' x2-7/8" /6.5# 24. Open to production or injection? Yes 0 No EI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 8629' 8102'/8099' 11461} 4 ✓ ; 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. RECEIVED C ■ 7ED Was hydraulic fracturing used during completion? Yes ❑ No G3 "i Per 20 MC 25.283(i)(2)attach electronic and printed bil.1"i/6)0SEP 2 6 2017 information 1- ''4+F f DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED t L' AOGCC See Attached 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ..... Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(coal: Press 24 Hour Rate Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only V'TL 1/2// jC1 28. CORE DATA • Conventional Core(s) Yes 0 No H , • Sidewall Cores Yes 0 No 10 ' If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No RI • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach • Top of Productive Interval 8904' 8821, separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 23SB-Zone 2B 8710' 8662' 22TS 8773' 8720' 21 TS-Zone 2A 8842' 8778' Zone 1B 8904' 8821' TDF-Zone 1A 9006' 8877' Formation at total depth: Zone 1A 9006' 8877' 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka,Joseph N Contact Name: Browning,Zachary H Authorized Title: Infor and Data eller Contact Email: Zachary.Browning@bp.com V ' 111 q lz� '► Authorized Signature: ate: Contact Phone: +1 907 564 5220 INSTRUCTIONS General:This form is designed f. submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Altemating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only • WELL NAME: 15-32B 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 8614' Set XX Plug 8176' - 8181' Tubing Punch 8584' 18.3 Bbls Class 'G' 8584' Fish: Milled CIBP/Cement Retainer 8535' Set Whipstock a • Daily Report of Well Operations 15-32B ACTIVITYDATE SUMMARY T/I/0= 2500/vac/210 Pumped a total of 290 bbls of 1% KCL down TBG, followed by 38 bbls of DSL down TBG. RDMO: FWHP: vac/vac/220 SV,WV,SSV,MV= S.LINE 8/6/2017 IA/OA= OPEN ***WELL S/I ON ARRIVAL***(Pre-CTD). RAN 3-1/2" BRUSH, 2.80" CENT, TO 3-1/2"X-NIPPLE © 8,614' MD (No issues). LRS LOADED TBG W/290bbls OF KCL W/38bbls OF DIESEL FOR FREEZE PROTECT. 8/6/2017 SET 3-1/2"XX-PLUG IN X-NIPPLE @ 8,614' MD. T/I/0=100/0/216 Temp= S/I Assist Slickline Injectivity test (CTD) Spot unit, rig up and 8/6/2017 pressure test. Did not pump any fluids. ***Continued on 08-07-17 WSR*** ***CONTINUED FROM 8-6-17 WSR***(pre-CTD). LRS PERFORMED INJECTIVITY TEST ON TBG W/ DIESEL(See Irs log). R/D SWCP 4521. 8/7/2017 ***WELL S/I ON DEPARTURE*** (pad op notified=job complete, well &well house status). ***Continued from 08-06-17 WSR*** Injectivity test. Pumped 15 bbls diesel down TBG to reload @ 1-3 bpm. Pumped an additional 60 bbls diesel down TBG after fluid packed © 1 bpm, 2bpm, 3 bpm at increasing pressures. Pressure never stabalized or reached 2500 psi as per program. See log for details. Slickline on well upon departure. IA OA= OTG, 8/7/2017 FWHPS=190/vac/216 T/I/O = 450Nac/190. Temp = SI. TBG FL (Eline Request). No AL. TBG FL @ 1000' (15 bbls). 8/9/2017 SV, WV, SSV= C. MV= 0. IA, OA = OTG. 10:50 ***JOB STARTED ON 09-AUGUST-2017*** (SLB ELINE SET CBP/TUBING PUNCH / SET CEMENT RETAINER) LRS LOAD AND KILL WITH 290 BBLS OF 1% KCL. RIH W/ BAKER 10/BAKER 4.5" COMPOSITE BRIDGE PLUG SET BAKER COMPOSITE BRIDGE PLUG AT 8194' ME. CCL TO MID ELEMENT = 7.8'. CCL STOP DEPTH = 8186.2'. LRS PERFORMED PASSING MIT-T(see Irs wsr) RIH W/CCL-L/MPD/5' X 1.56"TUBING PUNCHER, 4 SPF, 0 DEG PHASING/SPD. M CHARGES. TUBING PUNCH INTERVAL = 8176' - 8181'. CCL TO TOP SHOT = 5.7', CCL STOP DEPTH = 8170.3'. LRS PERFORMED FOR INJECTIVITY TEST(see Irs wsr) RIH W/ BKR 10/WLAK/3.60" BKR MAGNUM COMPOSITE CEMENT RETAINER. CEMENT RETAINER SET AT 8164' ME. CCL TO MID ELEMENT = 7.7'. CCL STOP DEPTH = 8156.3'. ALL PASSES CORRELATED TO 4.5" TUBING TALLY DATED 11-APR-2008. POOH. LRS PERFORMED PASSING MIT-T. (see Irs wsr) 8/10/2017 ***WELL LEFT S/I, PAD OP NOTIFIED*** • Daily Report of Well Operations 15-32B T/I/O= 559/vac/212 Temp= Shut in. Assist E-Line (CTD) ***TWO PASSING MIT-T's*** Pumped 5 bbls of 50/50 ambient meth and 297 bbls of 115* 1% KCL to load and kill TBG. Pumped 38 bbls of ambient diesel to FP. E-Line set CBP. MIT-T to 2561 psi, target 2500 psi ***PASSED***. Lost 86 psi in 1st 15 minutes and 33 psi in the 2nd 15 minutes. Lost a total of 119 psi during the 30 minute test. Pumped 14 bbls of 54* F diesel to achieve test pressure. Bled back 2 bbls to T/I/0= 14/vac/214. E-Line punched TBG. Pumped 70 bbls of diesel during step rate injectivity test. 1 bpm = 1483 psi./2 bpm = 2012 psi./3 bpm = 2365 psi. E-Line set cement retainer plug. MIT-T to 2700 psi, target 2500 psi ***PASSED***. Pumped 4 bbls of 55*dsl to reach a test pressure of 2700, 1st 15 min TBG lost 148 psi, 2nd 15 min TBG lost 31 psi. Bled back -'2.5 bbls dsl. Tags hung. E-Line on well upon departure. 8/10/2017 FWHP= 290/vac/213 Valves= E-Line CTU #9. 1.75" Coil Job Scope: Squeeze MIRU. Function test BOPs upon initial rig up. Make up and RIH with BOT cement stinger BHA. Tag retainer at 8170. PT CTBS and perform injectivity test down coil. 1 BPM @ 1500psi, 1.5BPM @ 2100psi, 2BPM @ 3250psi. Pump 18.3bbI of 15.8ppg class G. Final pressure through retainer 2180psi @ .3bpm. Unsting and lay in remaining 2bbl. Reverse 8/12/2017 out down to 5' above retainer. CTU #9. 1.75" Coil ***Continue from WSR 8/12/17*** Job Scope: Squeeze Finished jetting BOPs and tree w/ 10 bbls PowerVis. Standby for cement to reach 500 psi compressive strength. RIH with BOT 3.800" Mill and 3.800" string mill BHA. Tagged down at 8162CTMD and milled cement reatiner, cement, and composite bridge plug. Continued with mill in hole to 8584 (top of liner). Reamed cement sheath and dry drifted up and down. Circulate while POOH. OOH with milling BHA and attempt injectivity test. Zero injectivity. Pressured up to 2674psi, 10 minute test finished at 2558psi. String mill gaged at 3.78" NO GO. Make up and RIH with WS drift BHA, drifted clear to 8578'. POOH. Freeze protected 8/13/2017 well with 38 bbls 50/50. ***WELL SI ON ARRIVAL. PAD OP NOTIFIED.*** (SLB ELINE SET BAKER WHIPSTOCK) MIRU. LTI PASSED. INITIAL T/I/O = 0/50/200 RIH W/ HEAD/ERS/SWIVEL/CENTRALIZER X2/WPMOT/WPTET/WPGRT/WPST/BKR 10/BKR 4-1/2" MONOBORE WHIPSTOCK. OAL = 50', OAW=600 LBS, MAX OD = 3.63". TIE INTO SCHLUMBERGER MEMORY COMPENSATED NEUTRON LOG DATED 16-JUL- 2010 TOP OF WHIPSTOCK SET AT 8535', CCL TO TOW= 14.1', CCL STOP DEPTH = 8520.9'. WHIPSTOCK ORIENTED TO 180 DEG ROHS. WS OAL= 12.43'. 2 PIP TAGS 8/15/2017 INSTALLED 9' FROM TOWS © 8544. T/I/0=58/vac/213 Temp=SI (Performed well control drill) MIT-T PASSED to 2580 psi, Max Applied Pressure = 2750 psi, Target Pressure = 2500 psi. Pressured TBG to 2619 psi with 1.5 bbls 50/50 meth/water. TBG lost 21 psi in 1st 15 minutes and 18 psi in 2nd 15 minutes, for a total loss of 39 psi during 30 minute test. Bled 8/15/2017 TBG to 65 psi, returned '-1.5 bbls. FWHP's 85/0/216 Tags hung T/I/O=200/0/200 Pre-CDR2 Bled tree/tubing to 10 psi - RD 4" CIW upper tree assy from MV- Installed CDR-2 Tree assy#03 to MV. Torqued to API Specs, PT'd to 5000 psi. RDMO 8/19/2017 ***Job Complete*** FWP= 17/-10/200 • • Daily Report of Well Operations 15-32B T/I/O = 80Nac/210. Temp = SI. Bleed WHPs to 0 psi (Pre rig). No AL, flowline, SSV, wellhouse or scaffold. Tree has double WVs. T FL, IA FL, & OA FL @ surface. Bled TP to slop tank from 80 psi to 0 psi (-2 gals fluid) in 2 mins. Bled OAP to slop tank from 210 psi to 150 psi (-10 gals fluid) in 5 mins. OAP began increasing during bleed. SI & monitored for 15 mins. OAP increased to 210 psi w/no gas cap. Final WHPs = 0+Nac/210. 8/21/2017 SV, WVs = C. MV= O. IA, OA= OTG. 1650 hrs. • • • North America-ALASKA-BP wage 1 Operation Summary Report Common Well Name:15-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2017 End Date:9/2/2017 X3-018L3-C:(2,534,387.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:CDR-2 Spud Date/Time.4/2/1994 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000957 Active datum:KB @70.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 8/25/2017 00:00 - 02:00 2.00 RIGU P PRE CONTINUE WITH RIG CHECKS AND RIG MOVE CHECKLISTS. CONDUCT PJSM AND REVIEW RIG MOVE PROCEDURE WITH PEAKAND NABORS CREW. ;,PULL MUD MODULE OFF AND MOVE IT OVER TO THE SIDE. PULL DRILLING MODULE OFF AND MOVE IT DOWN THE PAD. INSTALL JEEPS FOR ROAD TRAVEL. 02:00 - 06:00 4.00 RIGU P PRE MOVE BOTH MODULES OFF L2,ACROSS DS-18,RIGHT ON WEST DOCK,RIGHT ON DS-15 ACCESS TO 15-32C. -STAGING RIG MODULES IN FRONT OF 15-32 06:00 - 07:45 1.75 RIGU P PRE PJSM ON PULLING OVER WELL. DISCUSS PERSONNEL POSITIONING AND DUTIES, AUDIBLE AND VISUAL COMMANDS FOR STOPPING THE JOB,VERIFYING PLACEMENT OF THE SILL BLOCK TO PREVENT MOVEMENT OF THE SUB TOWARDS THE WELL. -DISCUSS TYPICAL IA/OA PRESSURE LIMITATIONS OF<50 PSI AND ANOMALY OF OA WITH 200 PSI(SUCCESSIVE BLEEDS RESULTED IN PRESSURING UP TO 200 PSI EACH TIME). TEAM IS AWARE OF OA PRESSURE. -MOVE SUB MODULE OVER WELL 15-32. RIG ACCEPT AT 0700 HRS. MOVE PITS MODULE INTO PLACE 07:45 10:00 2.25 RIGU P PRE PROCEED WITH RIG UP OPERATIONS -SPOT IN SUPPORT EQUIPMENT -PRESSURE TEST HARDLINE TO FLOW BACK TANK TO 4500 PSI,GOOD TEST -RIG UP INTERCONNECT FOR MODULES RIG UP CELLAR FOR OPERATIONS. CYCLE VALVES,CONDUCT LEAK TIGHT TEST FOR TREE CAP REMOVAL TO CRITERIA IN WELL PLAN. GOOD TEST. 10:00 - 16:15 6.25 BOPSUR P PRE WORK ON CONCURRENT OPERATIONS: INSTALL INNER REEL IRON,WORK ON MUD PUMP#1,COMPLETE INTERCONNECT, NIPPLE UP BOP STACK. CONFIGURATION: -ANNULAR ELEMENT -BLIND/SHEAR RAMS -2-3/8"PIPE SLIP RAMS -MUD CROSS -3"PIPE SLIP RAMS -2-3/8"X 3-1/2"VARIABLE RAMS -MUD CROSS -BLIND/SHEAR RAMS -2-3/8"PIPE SLIP RAMS -GREASE CHOKE MANIFOLD,FILL STACK WITH WATER,CONDUCT BODY TEST AGAINST CLOSED IN SWAB AND MASTER VALVES. GOOD SHELL TEST,AOGCC REP ON THE WAY OUT TO WITNESS. Printed 9/11/2017 4:14:55PM "All depths reported in Drillers Depths` • • 111 North America-ALASKA-BP Page 2 e - Operation Summary Report Common Well Name:15-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2017 End Date:9/2/2017 X3-018L3-C:(2,534,387.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:CDR-2 Spud Date/Time:4/2/1994 12:00:00AM Rig Release: Rig Contractor NABORS ALASKA DRILLING INC. BPUOI:USA00000957 Active datum:KB @70.50usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:15 - 17:00 0.75 BOPSUR P PRE CONTINUE WITH INSTALLING PRESSURE BULKHEAD AND WORKING ON MUD PUMP 1 WHILE WAITING ON AOGCC REP 17:00 - 00:00 7.00 BOPSUR P PRE TEST BOP PER AOGCC,NABORS,AND BP 'REQUIREMENTS -AOGCC REP GUY COOK ON SITE TO WITNESS TEST -ALL TESTS TO 250 PSI LOW/3500 PSI HIGH TEST AUDIBLE AND VISUAL ALARMS -TEST ANNULAR WITH 2-3/8"AND 3-1/2"TEST JOINTS. -TEST UPPER AND LOWER BLIND SHEARS. 1-TEST UPPER AND LOWE 2-3/8"PIPE/SLIP RAMS TEST 3"PIPE/SLIP RAMS -TEST VBRS WITH 2-3/8"AND 3-1/2"TEST JOINTS. -TEST ALL CHOKE VALVES AND BOTH CHOKES. -TEST IS WITNESSED BY AOGCC REP GUY COOK. 8/26/2017 00:00 - 03:30 3.50 BOPSUR P PRE CONTINUE TESTING BOPS. TEST RAM LOCKS CONCURRENTLY. ONE FAIL/PASS,VALVE B8. 03:30 - 07:15 3.75 BOPSUR N PRE WHILE TESTING VBRS WITH 3-1/2"JOINT, HELD IN PLACE WITH LOWER 2-3/8"PIPE/ SLIP RAMS,THE TEST JOINT SLIPS UP ABOUT 2". JOB IS STOPPED,PRESSURE BLED OFF. NOTIFICATIONS MADE TO NABORS MGMT AND BP SR WSL. DEVELOP PLAN FORWARD. PRIOR TO OPENING BOP DOORS PERFORM LEAK TIGHT TEST OF SWAB AND MASTER VALVES,GOOD. -OPEN DOORS,SEALS GOOD. CHANGE OUT LOWER 2-3/8"PIPE/SLIP RAMS. RAM RUBBER SEALING SURFACES IN VERY GOOD CONDITION,INDICATIONS OF WEAR ON DIES THEMSELVES. RAMS REPLACED,DOORS CLOSED IN, FUNCTION TEST AND LEAK TIGHT TEST CONDUCTED 07:15 07:30 0.25 BOPSUR N PRE TEST BOP PER NABORS PROCEDURE AND AOGCC,BP,NABORS REQUIREMENTS -RESUMED PRESSURE TEST,TEST JOINT SLID UP AGAIN -STOP JOB,NOTIFY SR WSL 07:30 - 12:00 4.50 BOPSUR N PRE OPEN UP,CHANGE OUT RAMS AND CHANGE LOWER SECTION OF TEST JOINT -RAM COMPONENTS WENT IN BRAND NEW, CAME OUT FLATTENED -CLOSE IN RAM DOORS,LEAK TIGHT TEST GOOD PJSM FOR RESUMING TEST -CONDUCT PRE-SPUD WITH INCOMING - __- CREW Printed 9/11/2017 4:14:55PM *All depths reported in Drillers Depths` • • S .. North America-ALASKA-BP Page 3 Operation Summary Report Common Well Name:15-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2017 End Date:9/2/2017 X3-018L3-C:(2,534,387.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:CDR-2 Spud Date/Time:4/2/1994 12:00:OOAM IRig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000957 Active datum:KB©70.50usft(above Mean Sea Level) Date 1 From-To Hrs Task ! Code NPT Total Depth I Phase 1 Description of Operations 12:00 12:45 (hr) I (usft) , 1 0.75 BOPSUR , N PRE NEW CREW ON,DISCUSS EARLIER PROBLEMS,CONDUCT WALKTHROUGH VERIFY VALVE LINE-UPS,CONFIRM RAM LOCKS : -CONDUCT LOW PRESSURE TEST,NO LEAKS AND HOLDING FIRM 12:45 - 15:00 2.25 BOPSUR P PRE I RESUME BOP TEST PER AOGCC AND BP REQUIREMENTS I I-COMPLETE TEST WITH AOGCC REP GUY I I COOK TO WITNESS I -CONDUCTACCUMULATORDRAWDOWN TEST 15:00 - 18:00 3.00 BOPSUR P PRE I BOOT E-LINE,CHANGE PACKOFFS AND STAB ON WITH INJECTOR -FLUID PACK COIL WITH REVERSE !CIRCULATION J -PRESSURE TEST PACKOFFSAND INNER Ii REEL VALVE TO 250 PSI LOW/3500 PSI HIGH PER BOP TEST CRITERIA -GOOD TEST. 18:00 - 19:20 1.33 RIGU P 1 PRE I GREASE STACK AND HCR VALVES VALVE CREW CHECK TORQUE ON TREE ' VALVES. ,19:20 - 20:40 1.33 RIGtt P PRE POP OFF INJECTOR,CUT 10'OF CT AND FIND I CABLE. GET BACK ON WELL,REVERSE HOT KCL WATER AT 4.1 BPM TO TRY AND GET CABLE MOVING. i CABLE IS HEARD MOVING FORA SHORT TIME THEN QUITS. CYCLE PUMPS BACK TO 4.12 ' BPM. REMOVE INJECTOR,CABLE IS STILL THERE. DISCUSS WITH ODE,AGREE WE HAVE ENOUGH SLACK TO CARRY ON. 20:40 - 22:30 1.83 RIGU 1 P i PRE I INSTALL CT CONNECTOR. PULL TEST TO 50K,GOOD. PRESSURE TEST TO 4,700 PSI,GOOD. 22:30 - 00:00 1.50 RIGU P PRE I INSTALL BHI CABLE HEAD AND PT,GOOD. I INSTALL STINGER AND NOZZLE,GET ON WELL TO PT FLOATS. 8/27/2017 00:00 - 01:00 1.00 STWHIP li P 1 WEXIT PT FLOATS ' ,TEST PUMP HOSE IS LEAKING,CHANGE IT OUT. i ,PT FLOATS TO 3,500 PSI,GOOD. I OPEN WELL TO A CLOSED CHOKE. NO +PRESSURE. 01:00 - 03:20 i 2.33 STWHIP P WEXIT LIFT UP INJECTOR AND MONITOR WELL 1 WHILE BREAKING OFF NOZZLE. BRING BTT TOOLS TO RIG FLOOR. TRY TO BREAK MILL AND REAMER OFF BTT MOTOR SO THEY CAN BE TORQUEDONTO BHI MOTOR. UNABLE TO BREAK THESE SAFELY WITH RIG EQUIPMENT. TAKE BTT MOTOR AND MILLS BACK TO BTT SHOP TO BREAK THEM. I WHILE WAITING PUMP 10 BBLS MEOH+40 'BBLS KCL WATER FORWARD AT 4 BPM TO PUMP SLACK FORWARD. Printed 9/11/2017 4:14:55PM *AII depths reported in Drillers Depths* • 1110 North America-ALASKA-BP Page 4 294 Operation Summary Report Common Well Name: 15-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2017 End Date:9/2/2017 X3-018L3-C:(2,534,387.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:CDR-2 Spud Date/Time:4/2/1994 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000957 Active datum:KB @70.50usft(above Mean Sea Level) Date From-To ( Hrs Task Code NPT ' Total Depth Phase l Description of Operations (hr) (usft) ' 03:20 - 05:00 1.67 STWHIP P WEXIT BREAK OFF WELL,SLIDE INJECTOR BACK. MAKE UP 3.80"MILLING BHA#1 -PICK UP 2-7/8"XTREME MOTOR(0.6 DEG AKO)AND 3"COILTRAK TOOLS WITH 2 JTS OF PH6. -MILL IS 3.81"GO,3.80"NO GO. REAMER IS 3.80"GO,3.79"NO-GO. SURFACE TESTED COILTRACK TOOL.GOOD TEST. -PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES,GOOD -INJECTOR ON:04:50 05:00 - 07:15 2.25 STWHIP P WEXIT RIH WITH 3.8"MILLING BHA#1 -CIRCULATE AT MIN RATE WITH METHANOL SPEAR AND WARM KCL FOR INITIAL RUN INTO WELL -MAINTAIN 150-200 PSI BACK PRESSURE WHILE TAKING WELLBORE FLUID RETURNS TO FLOW BACK TANK 1-TAG WHIPSTOCKAT 8534'MD. PICK UP, INCREASE CIRCULATION TO 3.47 BPM IN,3.48 BPM OUT,3670 PSI -CIRCULATE TO CLEAN WELLBORE WHILE PICKING UP TO LOGGING DEPTH 07:15 - 08:00 0.75 STWHIP P I WEXIT LOG DOWN FOR GEO PDC TIE-IN -LOG TIE-IN,0'CORRECTION -CONTINUE MOVING DOWN WHILE CIRCULATING AT HIGH RATE,MUD CHASING KCL DOWN COIL 08:00 - 09:00 1.00 STWHIP P 8,534.00 WEXIT STAGE BHA AT WHIPSTOCK DEPTH,CLOSE EDC AND CIRCULATE MUD FROM BOTTOM JUST ABOVE WHIPSTOCK AT 2.71 BPM IN, 2.72 BPM,2540 PSI UNTIL MUD IS AROUND -OBTAIN PARAMETERS,MOVE DOWN AND MAKE INITIAL TAG AT (�/a N h 09:00 - 18:00 9.00 STWHIP P 8,537.00 WEXIT MILLING OPERATIONS FROM INITIAL TAG AT JllrTly` 8534'MD I Gj-3X j -2.80 BPM IN,2.79 BPM OUT,FREE SPIN 3150 li ! PSI -MW IN 8.96 PPG,CIRCULATING PRESSURE DURING MILLING 3280-3400 PSI,WOB 2.3-3.6K -COIL SLACK OFF WEIGHT 22-24K -SLOW MILLING. ADJUSTING WEIGHT AND CIRC PRESSURE BUT ONLY MILLING AT ABOUT 1/2'PER HOUR. -CIRCULATE DOWN A 5 BBL LOW/5 BBL HI VIS SWEEP TO SEE IF IT WILL HELP WITH PROGRESS. WOB INCREASED UP TO 4.0K BRIEFLY BUT ALL OTHER PARAMETERS REMAINED THE SAME. 1-MILL TO 8,537.84' 18:00 - 00:00 6.00STWHIP 6,539.00 WEXIT MILL 3.80"WINDOW IN 4-1/2"X7"LINER PER P BAKER REP FROM 8,537.84'MD TO 8,539.6' !MD 1-RATE:2.83 BPM IN,2.82 BPM OUT j-MUD WEIGHT:8.87 PPG IN,8.92 PPG OUT 1-DWOB:3.7-4.3 KLBS -CIRC PRESSURE:3,300-3,400 PSI -AT 8,538.7'STALL,PICKUP IS CLEAN. -CONTINUE MILLING TO 8,539.6'. Printed 9/11/2017 4:14:55PM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 5808 Operation Summary Report Common Well Name:15-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/25/2017 End Date:9/2/2017 X3-018L3-C:(2,534,387.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:CDR-2 i Spud Date/me:4/2/1994 12:00:00AM Rig Release: Rig Contractor:NABORS ALASKA DRILLING INC. BPUOI:USA00000957 Active datum:KB©70.50usft(above Mean Sea Level) Date From-To 1 Hrs 1 Task I Code 1 NPT I Total Depth Phase Description of Operations (hr) (usft) 8/28/2017 00:00 - 10:15 10.25 ! STWHIP P 8,544.00 WEXIT MILL 3.80"WINDOW IN 4-1/2"X 7"LINER PER BAKER REP FROM 8,539.6'MD TO 8,542'MD -RATE:2.82 BPM IN,2.81 BPM OUT -MUD WEIGHT:8.87 PPG IN,8.96 PPG OUT -DWOB:3.7-4.3 KLBS -CIRC PRESSURE:3,300-3,500 PSI -CONTINUE MILLING TO 8,544',BOTTOM WINDOW MARKED AT 8544'. 10:15 - 13:30 3.25 STWHIP P 8,555.00 WEXIT CONTINUE WITH TIME MILLING UNTIL STRING REAMER IS OUT OF WINDOW -MILL RATHOLE TO 8555 MD 13:30 - 15:15 1.75 STWHIP P 8,555.00 WEXIT CONDUCT REAM PASSES AT 15°LEFT AND RIGHT OF WINDOW MILLING DIRECTION -SAMPLE UP FROM EARLIER BOTTOMS UP INDICATES FORMATION SAND -REAM PASSES GOOD,CIRCULATE DOWN HI-VIS PILL 15:15 - 17:30 2.25 51 WHIP P 8,555.00 WEXIT SWEEP AROUND,FLOW CHECK OFF BOTTOM,ALL GOOD -POH WITH MILLING BHA -3.80 BPM IN,3.25 BPM OUT,3670 PSI -MW 8.93 PPG IN,8.88 PPG OUT 17:30 - 19:00 1.50 STWHIP P 8,555.00 WEXIT MONITOR WELL FOR 10 MINUTES AT BHA: STATIC -CLOSE EDC,POWER DOWN '-CONDUCT PJSM FOR CHANGING OUT BHA -INJECTOR OFF:17:50 -CONDUCT KICK WHILE TRIPPING DRILL WITH MILLER CREWAFTER INJECTOR IS SLID BACK. -CREW RESPONDS AS PER STANDING ORDERS,WELL IS SECURED IN 3 MIN. 1 -CONDUCT AAR AFTERWARDS. -CONTINUE LAYING DOWN BHA. -MILLAND REAMER ARE BOTH 3.80"GO, 3.79"NO-GO. 19:00 - 20:30 1.50 DRILL P 8,555.00 PROD1 CHANGE OUT O-RING ON CT RISER. 11 GET ON WELL WITH NOZZLE AND FLUSH OUT MM,PT NEW 0-RINGS TO 3,500 PSI,GOOD. 20:30 - 21:15 i 0.75 DRILL ! P 8,555.00 PROD1 PJSM THEN MAKE UP DRILLING BHA#2. MAKE UP4.25"DRILLING BHA#2 -PICK UP 2-7/8"ULS MOTOR(1.15 DEG AKO) AND 3"COILTRAK TOOLS MAKE UP 4.25°HCC BICENTER BIT -SURFACE TESTED COILTRACK TOOL.GOOD TEST. -PRESSURE TEST QTS TO 3,500 PSI HIGH FOR 5 MINUTES,GOOD ,-INJECTOR ON:21:15 21:15 - 00:00 2.75 DRILL P 8,555.00 PROD1 I RIH WITH 4.25"DRILLING BHA#2 -RATE:0.26 BPM IN,0.77 BPM OUT.CIRC PRESSURE:950 PSI -MUD WEIGHT:8.85 PPG IN,8.92 PPG OUT -LOG DOWN FOR TIE-IN FROM 8,340' (FORMATION)WITH NO CORRECTION 8/29/2017 00:00 - 00.30 0.50 DRILL P 8,555.00 PROD1 FINISH TIE-IN WITH NO CORRECTION. I RIH THROUGH WINDOW,NO ISSUES. TAG BOTTOM AT MIN RATE AT 8,555'. Printed 9/11/2017 4.14.55PM 'All depths reported in Drillers Depths* TREE= 4-1/16'aw • S NOTES: WELL ANGLE>70°@ 9015' Vy3_LHEAI5= F14.0 ACTUATOR= BAKER C 1 5-32 B "*"4-112"CHROME TBG& 7" LNR"" OKB.ELEV= 70.5' E1F.B_EV= (WA KOP= 8149' / 2008' - -14-1/2-HES X NP,ID=3.813' x Ang = 97' 10350' GAS UFT MANDRELS ST It4:1 TV D CEV TYPE VLV LATCH FORT DATE 4 3029 3028 1 ?J.43 ( 1Y RK 0 05/13/16 Maie (4) Denim MD= 8989' [ tum ND= 880Cf SS 20-CONDUCTOR 91.5#,H-40, 19.124"]- 114' 3 5031 5029 1 MMG CMY RK 0 05/13/16 1Y RK 04/ 13-3/8'CSG,6131t,L-80 BTC.13=12.415' H 3630' 2 6861 6859 0 AMCWAG 0 1108 1 7981 79791 5 MMG DMY RK 0 04/11/08 8062' -14-1/2-HES X NP,ID=3.813" Minimum ID =2.377" @ 8754' '3-3/16" X 2-7/8" CROSSOVER M i'M. 8092' —9-5/8"X 4-1/2"BKR S-3 PKR,ID=3.875" . 55 8127' -14-1/2"HES X NP,0=3.813" TOP OF 7LW H 8165' 1— ..• 8166' -9-5/8"X 7"TACK SLV TBG PUN2.1-1,4 SPF(08/10/17) H 8176'-81811 8173' -9-5/8"X 7-TM/LIP w/LNR HGR,D=6.276' 4 A •4 L - :CSG,47W,L-80 NSCC,D=8.681' - 8327' j--A -8692' -FISH:MILLED 4-1/2'BKR CRP(08/13/17) 4-1/2"BKR MONOBORE WS w/2 RA - 8535' FIP TAGS(8/15/17) W;E6R 0$10 010 8692' -3-1/7'DEPLOY SLEEVE,D=3,0/30" iffr°0, •;0+ 8604' -3-1/2'PUP.11-,D=2.992- TOP OF 2-7/8"LINR -' 0592' i od 8814' -H3-1/2"XX PLUG(08/06/17)V V 4 0 b., 4 — 8614' -3-1/2'OT X NP,ID=2.812' 4 01 od 0, 4-1/2"TBG, 12.8W,13CR-80 VAM TOP, H 8621' A ••• ••, •,1 •• .0152 bpf, ID=3.958' • .0•iv,,-4 8621' -14-1/2"WLEG,0=3.958' •• .•.•i 41,4• . 3-1/2'UR.9.3#,L-10 SIL,.0087 bpf,0=2.992' —1 8667' •• ••••4 *A ,•• •.,• 4LA-. •• ir•'• 7'LNR,28#,L-80 NSCC XO TO 13CR NSOC -1 8686' •. •• 8857' -I 3-1/2"XO TO 3-3/16',0=2.786' • • ••••• °••••4 • •• 7'LM,26#,13CR NSCC,.0383 bpi,ID=6.276" -L 8688' ••• i•• ••4 ••• ••.•4 ••4 •• ••• 7 ,6,, I 6,6,4 •"GEN I WFIFSTOOK(07/04/10) -1 8689' I ,',.-. --4 'i,•,fro t MLLOLJT WINDOW(15-32B) 8690'-8695' tf.4-i's• PERFORATION SUIMAARY 400,,,- •s* SV'171f,1 *. REF LOG:131-11 M1ACYGR ON 11/04/01 ;A,,-;•„?0,n`k, % A NSLE AT TOP PEW:61'@ 8980' Note:Refer to Roduction DB for historical perf data 8754' -:3-3/16'XO TO 2-7/6', SIZE SPF NTERVAL Opn/Sqz SHOT SQZ -• i ID=2,377" 2" 6 8980-9010 C 05/07/15 % 2' 6 9025-9055 C 05/07/15 1,474 i i• 1 1 % Ow V % 2' 6 0975-9135 C 05/07/15 .' 9235' 2-7/8"WFD CUP 2" 6 9317-9437 S 07/18/10 11/14/13 (05/06/15) 2" 6 9537-9797 S 07/18/10 11/14/13 2' 6 10017-10137 C 07/18/10 3-3/16'UNR,6.2#,L-80 TCI, H 8754' % 2' 6 10317-10527 C 07/18/10 % 0076 bpi,10=2.80" 2" 6 10637-10677 C 07/18/10 2' 6 10757-10787 C 07/18/10 • % 2' 6 10837-10877 C 07/18/10 2' 6 10927- 11237 C 07/18/10 2' 6 11287-11307 C 07/18/10 LH 8L8 &PUSHED C13P(11/28/13) j- 11637'CTM 2" 6 11387- 11477 C 07/18/10 FSTD - 11584' 4. 1B111, -911111P •I, 12-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441' H 11624' ] DATE REV BY CONVENTS [ATE REV BY COMMENTS PRUDHOE BAY LNT 04/28)94 CO ORIGINAL COMPLETION 08/15/17 NXW/JMD TBG FUNSI-VSET CMT RET&CBP(08110/1 r L. 15-32B 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) 08/15/17 JIMA4) KILLED CMT RET,CBP,SET RSH,CMT SQZ F .41-No: 2100620 04/11/08 016 RWO 08/16/17 BTNVI/D SETWS w/RA FIP TAGS(08/15/17) AR Mx 50-029-22462-02 07/18/10 NORDIC:CTD SIDETRACK(15-32B) SEC 22,T11N,R14E, 1676'FN_&333'FAL 05/24/17 RE31A4D FU_LED LTP(05/22/17) 08/08/17 JGL/JMD SET XX R_UG(08/06/17) BP Exploration(Alaska) V OF Tg� • • A \����v—. THE STATE Alaska Oil and Gas o fA T A ,C) ` /®� Conservation Commission r i iiJZ i.V.I���i t,,,,,,t, i� 333 West Seventh Avenue c GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 *' h'' Main: 907.279.1433 OF ,1,,‘,,N 0- 5 Fax: 907.276.7542 www.aogcc.alaska.gov Uchenna J. Egbejimba Engineering Team Leader—CTD & RWO %ANQ AUG 0 1. 20i BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 15-32B Permit to Drill Number: 210-062 Sundry Number: 317-328 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080,within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 6 ( CL - Cathy P. Foerster Commissioner DATED this 25Sday of July, 2017. RBDMS t (-- JUL 272017 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMN APPLICATION FOR SUNDRY APPROV S 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0, Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 210-062 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22462-02-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? RECEIVED Will planned perforations require a spacing exception? Yes ❑ No 0 PBU 15-32B 7 07Stzshr 9. Property Designation(Lease Number): 10. Field/Pools: L 1 4 2017 ADL 028306• PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY a �ynC Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): Plugs(MD): n 11624' 8816 . 9235 8892 2552 9235 11537 Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" 38-118 39-118 1490 470 Surface 3495 13-3/8" 38-3533 38-3532 5020 2260 Intermediate 8295 9-5/8" 35 8330 35-8322 6870 4760 Liner 522 T' 8165-8687 8161-8643 7240 5410 Liner 3032 3-1/2"x 3-3/16"x 2-7/8" 8592-11624 8563-8816 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 8980-11477 8866-8819 4-1/2"12.6# 13Cr80 33-8629 Packers and SSSV Type: 4-1/2"Baker S-3 Perm Packer Packers and SSSV MD(ft)and TVD(ft): 8102/8099 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary 0 Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 ' Service 0 14.Estimated Date for Commencing Operations: August 7,2017 15. Well Status after proposed work: , Oil ❑ WINJ 0 WDSPL 0 Suspended 0 " 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Browning,Zachary H be deviated from without prior written approval. Contact Email: Zachary.Browning@bp.com Authorized Name: Egbejimba,Uchenna J Contact Phone: +1 907 564 5220 Authorized Title: EngineeringyTeam Leader-CTD&RWO Authorized Signature: ..-�--/ , ,- C ' Date: '7 r ?/.,. -0 I 7.+ �,J COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 31-7- 2--� Plug Integrity ❑ BOP Test bir Mechanical Integrity Test 0 Location Clearance 0 Other: 5 0 P f-t',5 1- 10 3 SU 0 p , nvia pre. rCvzf—ei'i—t5f" tv 2- ' o v�, s l'�' v"--t"rd 1'z Ll�- 1 6tZ f f-I or `" Post Initial Injection MIT Req'd? Yes El No `fif✓►-j ,[�`4-A-e 2-5-411 (i ) Spacing Exception Required? Yes 0 No Subsequent rorm Required: 1 0-- 1-0 {� ,4447 Approved by: YTS. 7/Z.5/f 7 APPROVED BYTHE �� COMMISSIONER COMMISSION Date:?-Z S-v 0 RIGINAL RBDMS -JUL 2 7 2017 Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate /�®6/(" ...,./43.. 7:di. (7 • • • To: Alaska Oil & Gas Conservation Commission From: Zach Browning b./ p CTD Engineer 0' Date: July 13, 2017 Re: 15-32B Sundry Approval Request Sundry approval is requested to plug the 15-32B perforations as part of the preparation, drilling and completing the proposed 15-32C coiled tubing sidetrack. History of 15-32B: 15-32B was completed as a CTD sidetrack in 2010. The well was a full time producer into 2012 and cycled until mid 2013 when an unsuccessful GSO squeeze was performed to eliminate a suspected mid lateral gas entry. A plug was set following the failed squeeze and 90' of perfs were added in the heel. The well continued to produce until it recently reached MGOR. The well is no longer competitive and has no future wellwork options. The well passed integrity screening and is fit for sidetrack. Proposed plan for 15-32C: Drill a through tubing sidetrack with the Nabors CDR2 Coiled Tubing Drilling rig on or around October 1st, 2017. During pre-rig operations cement will be placed between the 4-1/2" tubing and 7" liner below the production packer to prepare for a dual string exit. A monobore whipstock will be then be set on eline. The rig will mill a 3.80" window and kick-off in Zone 4. The well is planned to cross the conglomerates and land at the base of Zone 1 targeting reserves in Zone 1A in - a 70 acre target southwest of DS 15. The proposed sidetrack is a -2700' horizontal Ivishak producer to be completed with a 3-1/4" x 2-7/8" L-80 solid x slotted liner with a modified bonsai cement job. If losses or faults/fractures are seen in the last 500', solid pipe is planned as a contingency and will be cemented and selectively perforated. This Sundry covers plugging the existing 15-32B perforations via the cement retainer and cement placed pre rig, and the liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre-Rig Work(scheduled to begin August 7th, 2017) 1. S Set TTP 2. F A/SL: Load TBG. Injectivity Test 3 E TBG Punch x2. Set Cement Retainer 4 C Circ Cement Job. Mill Retainer 5 S Drift for WS 6 E Set WS 3. V Pre-CTD tree work. Set TWC. corcut we if O ucevc G®,� r 2s h, tip, 74* rh a' a ,,v t l rna/; rho., double -r4t 6012 OF r�. best pl)°�terJ on nA ( for recta( 5�ov4 7-(4,7 t"i 0 1 ICCAvcrp from 1 .�,� earrl'o^ o< 7tie lorol. 447 • • Rig Work(scheduled to begin October 1st, 2017) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2552 psi). 2. Mill 3.80"window + 10' of rathole. 3. Drill Build and Lateral: 4.25" OH, 2736' (12 deg DLS planned) Run 3-1/4" x 2-7/8" L-80 solid by slotted liner leaving TOL at-8435' MD. 4. (Contingency to run all solid pipe if fault or losses are seen near the toe.) 5. Pump primary cement job: 27.6 bbls, 15.3 ppg Class G, TOC at TOL (8435' MD).* 6. (Contingency- Perforate -500'.) 7. Freeze protect well to a min 2,200' TVDss. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. 0: Re-install wellhouse, and flowline if needed. 2. V: Tree work as necessary. 3. F: Liner Lap Test 4. S: Set GLVs. Memory RPM log. LTP set post rig if needed and test.* Zach Browning CC: Well File CTD Engineer Joe Lastufka 564-5220 TREE= 4-1/16"CAN ll-CAD= • S NOTES: WELL ANGLE>70*@ 9015' WaFMC ACTUATOR= BAKER 15-3 2 B ***4-1/2"CHROME TBG$ 7"LNR*** OKB.ELEV= 70.5' BF.ELEV= NA 1 1 [ KOP= $149 , ' 2008' —j4-1/2"HES X NP,D=3.813" Max Angle= 97°@ 10350' --- Datum KU= 8989' / GAS UFT MANDRELS Datum ND= 8800 SS ST NCITVD DEV TYPE VLV LATCH PORT DATE _ 4 3029 3028 1 MMD DM( RK 0 05/13/16 20"CONDUCTOR H [91.5#, 40, 19.124" — 114' 3 5031 5029 1 MMD RK 0 05/13/16 2 6861 6859 0 MMD DMY RK 0 04/11/08 113-3/8"CSG,684,L-80 BTC,D=12.415" H 3630' 1 7981 7979 5 MMG DMY RK 0 04/11/08 ' , 8062' JH4-112"HES X NP,D=3.813 Minimum ID =2.377" @ 8754' 3-3/16" X 2-7/8" C R CMS S CMV E R z X 8092' —9-5/8"X 4-1/2"BKR S-3 FKR,D=3.875" 8127' —14-1/2"HES X NP,ID=3.813" TOP OF 7"LNR H 8165' 8165' —9-518"X 7"TEBAO(SLV 8173' —9-5/8"X 7"TIW LTP w!LNR HGR,D=6.276" 9-5/8"CSG,474,L-80 NSCC,D=8.681" H 8327' j—A k .4- � �� {—8592" 3-1/2"DEPLOY SLEEVE,D=3.000" 1 NR H TOP OF 2-7/8"L 8592' ► L 8604' —3-1/2"PUP JT,124=2.992" '4 1 1 8614' —13-1/2"011S X MP,D=2.812" 4-112"TBG,12.6#,13CR 80 VAM TOP, — 8621' •4 1 •.• •- 8621' —14-1/2"WLEG,D=3.958" .0152 bpf,D=3.958" •�•� • 0*• 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,D=2.992" — 8657' •••� •�• � 7"LNR,26#,L-80 NSC C XO TO 13CR NSCC — 8666' 1 •1•� ►•�• 8657' H 3-1/2"XO TO 3-3116 D=2.786" 7"LNR,264,13CR NSCC,.0383 bpf,D=6.276" H 8689' .••4 j•�•� 7"GEN I WHIPSTOCK(07/04/10) H 8689'••j••, ���•j , , NUL LOUT WINDOW(15-32B) 8690'-8695' PERFORATION SUMMARY /'_ ,,;terS,� � • REF LOG:BFI MWD/GR ON 11/04/012110.417"• #1.0111%W.• ANGLE AT TOP PERE:61*@ 8980' _ '_ Note:Refer to Production DB for historical perf data 8754' —3-3/16"XO TO 2-7/8", SIZE SPF INTERVAL Opn/Sgz SHOT SQZ D=2.377" 2" 6 8980-9010 0 05/07/15 %` 2" 6 9025-9055 0 05/07/15 14... iii ,.4 2" 6 0975-9135 0 05/07/15 r �.� 1 9235' —2-7/8"WFD CEP 2" 6 9317-9437 S 07/18/10 11/14/13 N(05/06/15) 2" 6 9537-9797 S 07/18/10 11/14/13 2' 6 10017 10137 C 07!181103-3/16'LNR 6.2#,L-80 TCt, 1 8754' I2" 6 10317-10527 C 07/18/102" 6 10637-10677 C 07/18/10 .0076 bpf,D=2.80" -2" 6 10757-10787 C 07/18/102" 6 10837-10877 C 07/18/102" 6 10927- t1237 C 07/18/10 FISH:MLLE)&PUSHED CEP(11/28/13)2" 6 11287-11307 C 07/18/10 2" 6 11387-11477 C 07/18/10 PBllk llink 2-7/8"LNR,6.54,L-80 STL,.0058 bpf,D=2.441" — 11624" `r DATE REV BY COMMENTS DATE FEV BY COM ENTS FRUDFk)EBAY LN1T 04/28/94 D9 ORIGINAL COMPLETION 05/13/15 DJS/JMD GLV GO(04/30/15) WELL 15-32B 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) 05/16/16 CJN/JMD GLV GO(05/13/16) - PERMT No:''100620 04/11/08 D16 RWO 05124/17 RB/JMD FULLED LTP(05/22/17) API No: 50-029-22462-02 07/18/10 NORDIC:CTD SIDETRACK(15-32B) SEC 22,T11 N,R14E, 1676'FM.&333'FWL 12/03/13 TFA/JMD MLLA)CBP&REI-ED OH(11/28/13) 05/08/15 TTR/PJC SET CER'ADPERF(05/06-05/07/15) BP Exploration(Alaska) TREE= - S4NOTES: WELL ANGt.E>70" $AIRLAAO- FMC CPROPOS15-32 " -1/2-CHROMETBG87" LNR"" OKB.ELEV= 70.5' BF.ELEV= NA KOP= 8149' 20"COND, —{ 114' ]----) , ' L _2008' J—j4-1/2"I-ES X NP,D=3.813" 1 Max Angie= ..2,0 91.5#,H-40, GAS LFT MANDRELS Datum MD= ID=19.124' ST IND TVD DEV TY FE VLV LATCH PORT DATE Datum TV Q= 8800' SS . — 4 3029 3028 1 'MG DMY RK 0 05/13/16 13-3/8"CSG,68#,L-80 BTC,D=12.415" --I 3630' — 41 II 3 5031 5029 1 MMG DMY RK 0 05/13/16 2 6861 6859 0 MAG DMY RK 0 04/11/08 1 7981 7979 5 MNG DMY RK 0 04/11/08 Minimum ID = " @ ' ' 8062' —14-1/2"FES X NP,D=3.813" ►� 1 8092' —9-5/8"X 4-1/2"BKR S-3 R<R,D=3.875" C , 4,7 *.4. 8127' H4-1/2"IES X NP,D=3.813" .4. TOP OF 7"LNR H 8165' ;. ,-.#4-. -p, 8166' —9.5/8"X 7'TEBACK SLV_J 8173' —9-5/8"X 7'TIW LTP w/LNR HGR D=6.276" ♦ ♦. '.4 4 4. '.1 ,.. ' 9-5/8"CSG,47#,L-80 NSCC,D=8.681" — 8327' J—, : 4 4 ♦. '.4 31/2"X 3-1/4'X 2-7/8"TOUTOC 8436" 8436' —3.70"DEPLOYMENT ENT SLEEEV E,D=3.00" 3-1/2'LN't , #, bpf,D=_ 8460' pi 811' 46 —' j3-1/"'"X 3-3/16'XO,D= fi ? "s " 74IP • K� 1 .r i ♦. 14-1/2' m H-, I,.t:K�t t�) 8535' } • MLLOUT WNDOW 15-32C)8535'-_' 321/2"LNR 9.3#,L-80 STL, .0087 bpf,D=2.992" --8536' l t / 9450' H3_1/4" / X 2-718"XO,D=2.377' 4-1/2"TBG, 12.64,13CR-80 VAM TOP, —J 8621' [ f .0152 bpf,ID=3.958" ,�i� 7"LNR 26#,L-80 NSCC XO TO 13CR NSCC — —8666' � / HPtPJTw/RA TAG R 3-1/4'LN6.6#, D 20 TC11,.0079 bpf, =2.85' H 9460' J 2 PERFORATION SUMMARY % o.st �`r( REF LOG ON__/___/__ 4 GCC A NGLE AT TOP PERF H —" 2-7/8"STL SOLD X SLOTTED . \ Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 5( V\Vqh e ,I^ 2-718"LNR,6.5#,L-80 STL,.0058 bpf,D=2.441' 11271' \� 0\,, DATE REV BY COMMBJTS DATE REV BY COMMENTS PRIJDHOE BAY UNIT 04/28/94 D9 ORIGINAL COMPLETION WELL 15-32- 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) PERMIT No: 04/11/08 D16 RWO AR No: 50-029-22462-0' 07/18/10 NORDIC i CTD SIDETRACK(15-32B) SEC 22,T11 N,R14E, 1676'FNL 8 333'FWL / / ' 'CTO SIDETRACK(15-32C) — 06120/17 JM? BUILT PROPOSAL. BP Exploration(Alaska) • • 0 Thousand Cubic Feet of Gas ("MCF") per Day or co Gas-Oil Ratio (MCF per Barrel) N. 0 0 o 0 0 0 0 0 0.1 0o0 kS3 N . o 1 PtOe. Pr i 1 E --- -m�1/ I -. et r' O�4 I c i -_-_ ,r - N0 ,♦ ° f0 -O C7 3 W CD C N M c -, - __ 9r o O� 0 VI rI 0 _ O Oe 2 ZO—1 W1, r ' - Sr N C1 g NM TJ * U 'a ++ a n W CO s L £ 1Sj c.- CCI Lil 2 E a 3 c; o�4. ro ro Lu p c ___= T------ - E O ..t"-- Z , o 0 o V� �__ o U - 0. a` CO I E E E ---____ — o U v u a 111. 4>oM CUw 4PP " C) CZ 'CO O ° L L - w Q 73 a s e I, et tt, • --. t 4.. a. :I 0 .co: _- ' -D U (1.1 D _------______ " U -C) = 0 i wi ` rr 4Pr 1 v . O r o 0 0 0 0 0 O �4N �n o Ln o u) t N N e-1 ri /lea _lad JaleM jo wiles Jo Aea .iad l!O }o slams u — — a • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsiblet 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist/ in the upper left corner of Form 10-403 is checked. If the "Abandon" or / "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon"box is checked in Box 15 (Well Status after proposed Geologist .b work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). / Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Saturday, May 14, 2016 6:49 PM To: AK, OPS FS3 OSM;AK, OPS FS3 Facility OTL; AK, OPS FS3 Field OTL; AK, OPS FS3 DS Ops Lead;AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC IL;AK, OPS PCC Ops Lead; G GPB FS3 Drillsites;Igbokwe, Chidiebere; Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; Sayers,Jessica; Dickerman, Eric; Morrison, Spencer; 'chris.wallace@alaska.gov' Subject: OPERABLE: Producer 15-32B (PID# 2100620) Passed MIT-IA All, Producer 15-32B (PTD#2100620) passed an MIT-IA on 05/13/16, and is reclassified as Operable. Work Completed: 1. Downhole Diagnostics:TIFL—FAILED 04/29/16 2. Operations: POP—DONE 05/01/16 3. DHD: Warm TIFL— FAILED 05/03/16 4. Slickline: Caliper tubing, set dummy gas lift valves—DONE 05/13/16 5. Fullbore: MIT-IA to 2750 psi—PASSED 05/13/16 The well may be brought online. Be cautious of thermal expansion, as the IA is fluid-packed. Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) SCANNED MAY 1 2016 Office: (907)659-5102 Email: AKDCWeIIIntegrityCoordinator@BP.com FromiAK,,D&C Well Integrity Coordinator Sent: 01 May'�`�1t03:47 To: AK, OPS FS3 OSPI; AK, OPS FS3 Facility OTL; AK, OPS FS3 Field OTL; AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; AK, OPS PCC Ops Lead; G GPB FS3 Drillsites; Igbokwe, Chidiebere; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Witney; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; Sayers, Jessica; Dickerman, Eric; Morrison, Spencer . Subject: UNDER EVALUATION: Producer 15-32B (PTD# 2100620) Sustained Inner Annulus Casing Pressure over MOASP All, Producer 15-32B (PTD# 2100620)was reported to have sustained inner annulus casing pressure over MOASP on April 27, 2016. The pressures were confirmed to be TBG/IA/OA= 2480/2480/250 psi. A subsequent cold TIFL performed on 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Saturday, April 30, 2016 6:48 PM To: AK, OPS FS3 OSM;AK, OPS FS3 Facility OTL; AK, OPS FS3 Field OTL;AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL;AK, OPS PCC Ops Lead; G GPB FS3 Drillsites;Igbokwe, Chidiebere; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; Regg, James B (DOA); Sayers,Jessica; Dickerman, Eric; Morrison, Spencer Subject: UNDER EVALUATION: Producer 15-32B (PTD# 2100620) Sustained Inner Annulus Casing Pressure over MOASP All, Producer 15-32B(PTD#2100620)was reported to have sustained inner annulus casing pressure over MOASP on April 27, 2016. The pressures were confirmed to be TBG/IA/OA=2480/2480/250 psi. A subsequent cold TIFL performed on April 29, 2016 failed on the overnight build up rate indicating a potential lack of two competent barriers in the wellbore. At this time, the well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics:TIFL—FAILED 04/29/16 2. Operations: POP 3. DHD: Warm TIFL 4. Well Integrity Engineer: Additional diagnostics as needed Please call with any questions or concerns. Thank you, Ryan Holt SAWED MAY 0 9 2016 (Alternate:Lee Grey) BP Alaska-Well Integrity Engineer GI\ WIC Office: 907.659.5102 WIC Email: AKDCWeIllntegrityCoordinator@BP.com 1 STATE OF ALASKA . SKA OIL AND GAS CONSERVATION COM..__SION • REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon ❑ Plug Perforations Q Fracture Stimulate ❑ Pull Tubin❑ Operations shutdown ❑ Performed Suspend E Perforate E Other Stimulate ❑ Alter Casin[ ( j Change Approved Program n ' Plug for Redrdl fl erforate New Pool n Repair Well ❑ Re-enter Susp Well n Other _ C/5? LTJ/ 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development ❑✓ Exploratory ❑ 210-062-0 3 Address P O Box 196612 Stratigraphic ❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22462-02-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028306 PBU 15-32B 9.Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary RECE Total Depth measured 11624 feet Plugs measured 9235 feeL ! Wi E T true vertical 8815 54 feet Junk measured 11537 feet JUN 0 `, 2015 Effective Depth measured 9235 feet Packer measured See Attachment feet ����� true vertical 8892 38 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 37-117 37-117 1490 470 Surface 3495 13-3/8"68#L-80 35-3530 35-3528 78 5020 2260 Intermediate None None None None None None Production 8295 9-5/8"47#L-80 32-8327 32-8318 84 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet Ea ,iI_ ( q2.O True Vertical depth See Attachment feet SCA" Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 34-8631 34-8596 38 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary: Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation. 289 32461 12 0 1151 Subsequent to operation: 0 0 0 0 0 14 Attachments(required per 20 AAC 25 070 25 071,8 25 283) 15 Well Class after work Daily Report of Well Operations E Exploratory❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work Oil U Gas U WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita SummerhaysCa�bp.com Printed Name Nita Su merh- 4/ / Title Data Manager / Si�yiii ,/r/lIP�i��:-, , Phone 564-4035 Date 6/3/2015 jr7-2_ 6/1V/ RBDMSJk JUN - 5 2015 Form 10-404 Revised 10/2012 Submit Onginal Only Daily Report of Well Operations ADL0028306 ACTIVITYDATE I.. • �F r: ***WELL S/I ON ARRIVAL*** SWCP 4522 STANDBY FOR NEW PERMIT SWCP 4522 R/U DHD SHOOTS FLUID SHOT ON T/IA. FLUID LVL @ (T- 5,345' MD , IA- 180' MD) RAN 2.25"CENT& 1-3/4 SAMPLE BAILER TO 8,867'SLM (empty bailer) SET 4-1/2"WCS-45 AT 8,536' SLM PULLED RK-DGVL FROM STA.#3 AT 5,031' MD PULLED RK-DGVL FROM STA.#4 AT 3,029' MD 4/29/2015 ***CONT ON 4/30/15 WSR*** T/I/O =2350Nac/420. Temp = SI. T& IA FL (SL). No AL. T FL @ 5345' (Between Sta 2 &3), IA FL @ 180'. 4/29/2015 Slickline on well in control of valves. 1615. *** CONT FROM 4/29/15 WSR*** SET RK-LGLV IN STA.#4 AT 3,029' MD SET RK-OGLV IN STA.#3 AT 5,031' MD PULL EMPTY WCS FROM 8,536' SLM 4/30/2015 ***WELL S/I ON DEPARTURE*** CTU#6- 1.75" CT Job Scope: Jewelry Log, Set CIBP,Adperf MIRU. MU WFD MHA w/2.2" PDS logging carrier w/GR/CCL&2.30"JSN. Load well w/ 178bbIs of diesel w/ Lube 776. RIH and tag down at 11287', got wt back at 11278'. Log up at 60fpm from 11278'to 8500'. Paint yellow/red flag at 9180'. POOH. Tie-in to MCNL 16-JULY-2010, +14' correction. MU 2-7/8"WFD CIBP. RIH, correct depth at flag and set CIBP at 9235'. POOH. RIH with 2" perf guns (30' gun with 6 spf and 2006PJ charges) and correct depth off CIBP. PUH and shoot interval from 9105'-9135'. POOH. Cut 100'of pipe for chrome management. MU WFD MHA w/2"x30' pert gun and RIH. 5/6/2015 ***Job in Progress*** CTU#6- 1.75"CT Job Scope: Jewelry Log, Set CIBP,Adperf MU WFD MHA w/2"x30', 2006PJ HMX pert gun and RIH. Perforate interval from 9075'-9105'. POOH. MU 3rd 2"x30'2006 PJ HMX perf gun and RIH. Perforate interval from 9025'-9055'. POOH. MU 4th 2"x30'2006 PJ HMX perf gun and RIH. Perforate interval from 8980'-9010'. POOH. Well loaded to the perfs w/diesel. RDMO. 5/7/2015 ***Job Complete*** FLUIDS PUMPED BBLS 361 DIESEL W/LUBE 1 DIESEL 39 50/50 METH 401 TOTAL d N m m O N M Ln NTN- OOM M N- N •:1- CON L d- M N- Ln Ln O) O (0O) 03000 G 00 I- N O) cV M O Ln c- CO c- = 00 aw O M , O ti N Lo M c °) Com) N N N O co M M co c0 co M M 00 CO CO CO 00 CO 0 M M M O O O M M M M M O O > LU 0 W Z . C] C] O W ❑ H H J UJ g g Y U ° > o 00w Y H g H M M LU M M Ln 0 C0 N- M _ _ J Q Q W W L I- O '- M O O M C0 O M ti M N N- J J J cn Z Cr G In M O7 CO O) N O co cc - - cc Q Q Q W CL 0_ p 0 0 0 CO CO CO CO M 0 0 O O co Z Z Z ° p p J o M M M M M CO M CO M M M c Q Q = o o a 0_ H O O O W Z Hp Z W W w a H H Q J < 2 2 O cn co co co cn m N co m L O Lo Lo O (` r_ N- N- ti N- N- N- N- ++ G = Lo O M M m M N I— O N- M O I` C d O O O 0 0 0 0 = .- = O M M M O O O 01) co E w A d co J = H OH CL J 0_ C.) O cn co u) co co as (LI 4-1 a00 � N O O H C O L O Ln Ln Lo N- I- N- N- N- N N N.- N.- N. J N I` O M `- M U M N M M C) p a,a O0) O O CD M LC') O co CO I- O O) N co < o 0 0 0 0 0 0 0 0 0 0 0 O .- ,- CO m L m o E 9- L CD CL a) 0 O U c .2 LL LL LL LL U) U) U) U) U) U) U) U) U) U) lia_ 0_ 0_ 0_ 0_ 0a000IZ m0_ 0_ o Q Q Q Q m m m m m m m m m m a O t m d 0 w J m d cn H w ea aIn Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Q U 0 O Q c— = = = = = = = = = N— = = C) DD W J J Z w c O O O O O O O O O O O 000 Z w CL CL Q W WONNNNNNNNNNN NNN _ _ _ p W N N w• WMIN. OMMOMMOO MMO WW CC On n n n n n n n n n n n n n ZLUU' U W W LL W . Q o O C] J J DDQ' 0.. Q CO Q CCCC J J O O W W Q Q CO CO Lc IT. N Cn Q cK G) E Z m m CO CO CO CO CO CO CO m m CO CO CO N N N N N N N N N N N N N N M M M M M M M M M M M M M M i i ' i i i i i i ' L.L d Cn 0 LL N Cr w In Ln Ln Ln Ln L.n Ln In Ln Ln Ln Ln Ln CD a Cl- a U -100W 0_N- N- r- 1- 1- = = = = = = c- c- = Q Q CO CO LL w (n (n d cC cu ao o o 0 0 0 CU l,- LC) cO CJ 0 U 0 0 L000 or� 000 3 N N 0 CO O dr N I" CO LC) CO LC) N N V' V Cr) CO O CO V V LC) CO N- M V co N Lc) LC) 00 00 CC) - N O 'Zr A N 07 CO CO I� CO CO CO 10 LC) CO 00 CO CO CO CO CO CO i I— - N- N Ln N - CO CO 0) V N aO V N N LC) Cr) CO Cfl N O CO M - LC) CO CO r-- CO CO CO CO CO CO LO LC) CA N N M M LL CO CO f� 0 CO LO CO - CO CO CO CO CO M CO QO LC) N LC) M CO Cr) LC) CO LC) N LC) 'Cr CO M LC) CO (0 N- co co co CD N co 0o co co 0o C O • 0 0 Q o 00 0 c _JO �'CO coO „,,c) * N M Lo 0000 *k N L!) �# M C0 CO (0 •N r (O O _ *k CO ON CV CO (Ni CO 00 M N co N O COL +-' O LC) Ln O)O O LO N- LC) N- a) C)) 0) C CO (D CS) N 00 N V' L0 Lo N co co co J z CD O c � t= w V0CCCCCCfY (YOtiZ Z w w w w w O m O z z z z z fD D U J J J J J d U) Packers and SSV's Attachment ADL0028306 SW Name Type MD TVD Depscription 15-32B PACKER 8103 8099.95 4-1/2" Baker S-3 Perm Packer 15-32B PACKER 8173 8168.98 7" Liner Top Packer TREE= 4-1/16"CNV WELLHEAD FMc 15 'n NOTES: WELL ANGLE>70° 9015' ACTUATOR= BAKERC 3 2 B ... 4-1 l2"CHROME TBG& 7"LNR••• OKB.REV= 70.5' BF.ELEV= NA KOP= 8149' Max Angle= 97°@ 10350' ' i 2008' -14-1/2"X NP,D=3.813" Datum MD= 8989' GAS LFT MANDRELS Datum TVD= 8800' SS ST AID TVD DEV TYPE VLV LATCH PORT DATE 20"CONDUCTOR,91.5#,H-40, 19.124" -1 114' ,) 4 3029 3028 1 MUG DOME RK 16 04/30/15 3 5031 5029 1 MUG SO RK 20 04/30/15 13-3/8'CSG,68#,L-80,D=12.415' H 3530' 2 6861 6859 0 MUG DMY RK 0 04/11/08 1 7981 7979 5 MNG DMY RK 0 04/11/08 8062' -14-1/2"X NP, D=3.813' Minimum ID = 2.377" @ 8754' 3-3/16" X 2-7/8" CROSSOVER R ►_ 8092' -9-5/8'X 4-1/2"BKR S-3 PKR,D=3.875" 8127' -{4-1/TXNP,D=3.813' TOP OF 7'LNR H 8165' —11 r8165' -9-5/8"X 7'TEC K SLV 1 8173' -9-5/8"X 7"TAN LTP w/LNR HGR,D=6.276" 9-5/8"CSG,47#,L-80 NSCC,13=8.681' - 832T -A 8591' -4-1/2'BKR KB LTTP(08/09/10) 008592' -3-1/2"DEPLOY SLEEVE,D=3.000' TOP OF 2-7/8'LNR -1 8592' ^ , ►4 ►4 • 8604' H3-1/2"Ra,JP JT,D=2.992" ►4 :, 8614' H 3-12'0TIS X NP,13=2.812' ►4 •4 4 4-1/2'TBG,12.611,13CR-80 VAM TOP, -i 8621' • 4 .•� 8621' H4-12"WLEG,D=3.958' •.0152 bpf,V=3.958' •�•� 00•� 3-12'LNR,9.3#,L-80 STL,.0087 bpf,D=2.992" - 8657' •�•� •�•� 8657' -�3-12'X0 TO 3-3/16',D=2.786" r LW,26#,L-80 NSCC XO TO 13CR NSCC - 8665' •••� 4'•4' • -- ••••4 •••• 7'LNR,26#,13CR NSCC,.0383 bpf,ID=6.276' 1--- 8689' •••' •••• •••4 ••••• • 7"GEN 1 WHFSTOCK(07/04/10) 'H 8689' ••••4 .••• • •ce • MLLOUT V1�DOW(15-32B) 8690'-8695' PERFORATION SUMMARY 0ss� REF LOG:61-1MWiYGR ON 11/04/01 •4'• ANGLE AT TOP FERE:61°@ 8980' 371 .r •_ Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz SHOT SQZ 8754' -3-3/16'XO TO 2-718', 2' 6 8980-9010 0 05107/15 D=2.377" 2• 6 9025-9055 0 05ro7/15 .:•: 2" 6 0975-9135 0 05107/15 ►• �•' 9235' -2-7/8'WFD CEP 2" 6 9317-9437 S 07/18/10 11/14/13 'f' (05/06/15) 2" 6 9537-9797 S 07/18/10 11/14/13 2' 6 10017-10137 C 07!18/10 ♦ 3-3/16"LNR 6.2#,L-80 TCI, H 8754' ! ♦ 2" 6 10317-10527 C 07/18/10 ♦ .0076 bpf,D=2.80' 2" 6 10637-10677 C 07/18/10 ♦ 2' 6 10757-10787 C 07/18/10 ♦♦ 2" 6 10837-10877 C 07/18/10 2" 6 1 2' 6 111287-11307 C 07/18/10 287-11307 C 07/18/10 FISH.PALLED&RJSI-1)CSP(1128/13) 11537' CTM 2' 6 11387-11477 C 07/18/10 MID - 11584• iii► 2-718"LNR 6.5#,L-80 STL,.0058 bpf,D=2.441' H 11624' ,r DATE REV BY COM ENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/28/94 09 OFAGINAL COMPLEf10N 05/13/15 DJS/JM)GLV C/O(04/30/15) WELL 15-32B 11/08/01 NORDIC 1CTD SIDETRACK(15-32A) EERA T No:"2100620 04/11/08 D16 MO AR No: 50-029-22462-02 07/18/10NORDIC i CTD SIDETRACK(15-32B) SEC 22,T11 N,R14E, 1676'FM_&333'RM. 12/03/13 TFA/JMD MILLED CBP&Ft1SFED DH(11/28/13) 05/08/15 TM/PJC SET CUFF ACFERF(05/06-05/07/15) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable direct inspection of the file. 0- oba Well History File Identifier b Organizing(done) ❑ Two-sided III I1E111III II III ❑ Rescan Needed III 11111111111111 RES AN DIGITAL DATA OVERSIZED (Scannable) olor Items: ❑ Diskettes, No. �` I ❑ Maps: Greyscale Items: Other, No/Type: C2. 1*' 1 ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: caria) Date: / 13 /if /s/ a\ P Project Proofing 11111111111111 BY: Maria Date: ` i a//çL /s/ , Scanning Preparation 3 x 30 = ° + A I = TOTAL PAGES /1/ (Count does not include cover sheet) BY: Maria Date: it /3 ' Lt is/ II(0 Production Scanning 11111111111111111 Stage 1 Page Count from Scanned File: / ha--(Count does include cover et) Page Count Matches Number in Scanning Preparation: YES j/l/lfD NO BY: Date: I //31 i'' /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. IIIIIIIIIIIIIIIII ReScanned 13111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111111111111 10/6/2005 Well History File Cover Page.doc 1 ■ o C . U O o m a N co «a L co 0 Ca p "0 0 ° Cr a N Z 0 a) 0 co 0 0 a0 ^2 xS L7 N I CD fY IX IY U` = g t CC o /t c EF- ZL �� co �U o o 1, Z E �ti 2 m U 0u_ .0 -i C7 p-Cr_ to 7) Z tom p CC Q- 2° 0 00 O a)i > m E _ u)0 CL 6' Ja ". 0 0 O a t d a d a v a Z o 00 0 2 0 m m 2?0 2? 0 j 0 m miam p j CI a CO 0 2U c.)o_ a CL 00L.- 0a 2 F- 2 a 0La0 2 f- 22 0 9 0 0 0 0 0 co 1 o O o 0 co O O co O O O N N N N N N N N N N J I C) N CN a)0 A T N 0 Q N N N N N N cc Z J O) O C) C) C) CO M E .- Q 4- C C C C C C C C C C C C C C C Y 2 2 CO c a a n CO o_ 0_ a) a) a) o. C. o. o. a Cl) a) OU in 0 O O O O O O O O O O O O O O O I— CO Y Ce a E P.? C CD d' v o O v v v v v (N O O O O O co O W co N N V V N N N N N N '�t V �i V' V Z j (6 y V Lo CD CD N N a) CD O CO fD O N N N N N O. • 0 � N � 0 0 0 W g Y _ _ _ rot O C co N Cn Cn co (C) co co 00 co 00 CO CO O co W CO CO CO O J — 2 O N 0 0 U) CD CO C) M CO CD Cr) CO M CO CD c) a. Cl) co CO 0) 0) CO CO CO CO CO CO CO CO 00 CO CO CO Co W w U m Z o c reZ < Ja) co ;co CL o N y = O O O O O O N C ZI J m 2 0 0 0 0 0 0 • r 0 N v) a) n a) O)1a Lo to in (N N LO 10 N U) U M E J CO 0 E J �' m Q` N C"1 I— co F- O J 0 5r N 0 G Q c CO < 0 o a) Z Cn o ro 0 C3 4:( a °- 0 Q ° ca. ZI a Q Z o p a) a)aa)) CD a)aa)) N 0 p 0 Z Z Z Z C C J 7 7 > O o Z 7 f6 fa Ca Ca N Ca 0 Ca C Ca fa CL CY _ CO CO Ca CO U CL' U y 1 N C C O O O O • CO R 5 N N N N E > E E E E > E E E E c C4 Z a) a) CO co co co co co co (0 N CO co N Z Z p p p p 0 J 0 0 0 0 J 0 0 0 0 O p Z O co y a) co O) CO N Q J y .0 Cn CO 0 O ~ N d R 7 N N N N O Q Z • C W 0 Z N :. o < ° E _ Ei E a Z u. V •43 L y 0 CO N u) C) CD O W Lt r rp o � J J J J p W w _z W O 2' . N, v. U `;; 1 \ 1 ` L E 5 Q to J e m 0 W C y � ° 0 a p n p n p a a o o 0 a p o 0 CO CL 0. Q H 1-O -10 J W W CC W CC W CC W J J J W W J J J 0 1 o N '1 o 'I I N I m Pl!/1 N z a» _U , N � oI in o 1 , z F. Q J -{ IlL] z z , z c .0 it 1 IX a w W J U m o '- Z - D o ICC Q CD O R' H 1 u) o a O co c ? E C N c N m p 1 .I G o N O C O y O 5-1-* Q E C.) c-2 o 0 1 J m 1 Q M co 1"" 2 o — N z O i C >- N_ c Q d CO r m C O w t o o cn 1 Q = G a_ o Q o 1 0 Z ! o E U 1 z I I y 1 3 co c 00 0 oo m z ! OMEN I- D aYz) ) H m CD c F 2 b>- m cc 0 N d O II N E m E z > D m N z Q v 'ai v H O d z N U c ++ •- o O oO w a) i y R• E U — a ? o STATE OF ALASKA REC EI VED • AL ,:A OIL AND GAS CONSERVATION COMMr_�1ON DEC 1 9 2013 • REPORT OF SUNDRY WELL OPERATIONS l"Jy (�(� 1.Operations Abandon H Repair Well U Plug Perforations U. Perforate U Otherj c3C0 Performed: Alter Casing ❑ Pull Tubing Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development is Exploratory ❑ 210-062-0 • 3.Address: P.O.Box 196612 StratigraphicS Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22462-02-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028306 . PBU 15-32B • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 11624 feet Plugs measured None feet true vertical 8815.54 feet Junk measured 11537 feet Effective Depth measured 11584 feet Packer measured See Attachment feet true vertical 8816.44 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 37-117 37-117 1490 470 Surface 3495 13-3/8"68#L-80 35-3530 35-3528.78 5020 2260 Intermediate None None None None None None Production 8295 9-5/8"47#L-80 32-8327 32-8318.84 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9317-9437 feet 9537-9797 feet 10017-10137 feet 10317-10527 feet 10637-10677 feet 10757-10787 feet 10837-10877 feet 10927-11237 feet 11287-11307 feet 11387-11477 feet True Vertical depth 8886.98-8879.54 feet 8879.03-8872.51 feet 8862.35-8853.98 feet 8839.68-8830.09 feet 8834.9-8835.03 feet 8833-8831.41 feet 8828.76-8826.92 feet 8824.37-8821.84 feet 8821.24-8821.08 feet 8818.13-8818.82 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 34-8631 34-8596.38 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 9317'-9437',9537'-9797' Treatment descriptions including volumes used and final pressure: 153 Bbls OrganoSeal, 1944 psi;20 Bbls 14.1 ppg SqueezeCrete,3000 psi. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 347 33276 18 0 1394 Subsequent to operation: 154 1405 96 0 1761 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ell - Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 . Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron(BP.Corn Printed Name Garry Catron Title PDC PE Signature A,^ T Cwt Phone 564-4424 Date 12/19/2013 vi -r; 1 F�w RBC"M DEC 2 0 ' Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment ADL0028306 SW Name Type MD TVD Depscription 15-32B PACKER 8103 8029.45 4-1/2" Baker S-3 Perm Packer 15-32B PACKER 8173 8098.48 7" Liner Top Packer co O O W 0O CL) (D � COCOO Q •— tt N N- C.) 0 0 ° O 0 0 0 0 m• N 0 N- 0 CO ,0 m r r LoNN � 1- [F0000 O) M 00 r- M - Nr 00 N t0 u 00 CO CO - CO CO I- CO C1O M '.0 It) W W CO 00 00 CA M CO eliiiiille N- f� N u, N COMM MCOCO .- NOMMm r to CO CO N- 00 00 00 00 00 CO LO LO M g N M M CO CO I■- 0 CO CO CO CO 00 00 CO 0 M W V (0 CD CI lllllllll Q M O N cO cr CO CO O) co CO co N Lo v a) N M .- Loocor- mmm = G 00 co 00 co Oo Q C Q 0 00`0 O) c co JI M C NJMC ;;T.- Coco it • � •� f/) - co C _ 4t V O N N 0 N O T N A M N o m t O 0 N- LO O� OO) Oa) Oa) 00 � CO O) N N CO CO CO z O co I I- w H > > VC7 v OWWWWWOtaiz z w w w w w O m OzzzzzWDD U J J J J J 0 U) H L u) Q O 4— Oa LLJ (n 0 L L_� 0 C I z O O co m N (n O > L a) c O (n (Op E OI co U N � a N N O (0 N a) (o O U L a N U o C Ti) OQ =o +� Na) C C co C (N LO o C ° C "O t O 0) 5 N C a) — a) O u) M - N L.T. N (A O N ° a) o co O a) o a) 3 a Q a) (1) O C (o . a O a a U I a) 8 (n L co C U OM LL. U O �t a) n 0 0 U co a)> 5 a) r RI 72, 0 O a D O W N N O U (0 _ u) O a N 0 O _ O co I - O U ° 7 CO C f- o N N C C U > > > - O Cl) a0 co ONZ C QU ELI a) +� co Q = w Q) O O O (0 O ,.., o p 0 O Z E Z in O (a _c all c) p co 2 u co ++ -o E Cl) O r- -0 -O O O C co co C "s OL Q) M 4 C U 0-) O ir) U L .- N O " co o O .0 � _ ° co E - E a o co L L L Q. p U CD p) N 0-D 6 a) O 2 (o - z _ O c U N N O _ O co Q N FL- ° in o p co a) ui _J m • _c a Q> o o a) Co _ = M a CO io1 3 co m Z a) c 4- C J cp N a) and a) QO 0 a m N Q 4- 0 U O c C0 O o - a aa)) O in 3 a)) a a) w o n t w 0 0 O a) C a) a) O a) U a) N. -° _a E c � c � � L J N U N U 0 N U)C) ' E •N io a c O p m a) MD a) c \ U m a) 't c ao l) 0 . ( - <a)O 0 a) ° c a) C7 c a a E u. \ II -0 — (n m > a cn - co 0D co o �. 5 wa a) co a- o° � � u) O W M L _ u) Q (n - U C E c cc N 0_ O To 0- ca0 J O - 02 0 0 ,- >1 O a) II II W CO (n O L U U a) m U ° (B U I- _ t "O U > ? } k\ / \§ $ O C � » �® / \/° ® f _0$ o 0o S /? ? \ ntc o % / 0 R @ - 0. _c ? o = \ � / \ O N 0 \ / \ 0_ g ) $ _ c k co D G 3 E \ \ R e ° _ 2 .g % / E \ ._ § EEG $ % \ o a % � f / 2 2b \ $ © / 7 / > O O C e k ® m o $ 0 a R U E n C 0 E U) r 0 / ± / \ $ S t i = c / o c _ o m / 0 .§ CV CO _ \ e e _ I o f o w ° al 5 \ ° � / 7 £ 2 \ / -c a ._ o a I ± O ® > _ = ow = o - m ii 73. CO% § \ - e O.� 0 �a�CD / \ / $ � fq / \ „ \ / M n D 0 \ .c © � w a o E . ,- f f ® 0 CO E e I I w > _ o R • o _o � I E < 0 / 6 < = N O / \ E 7 .e n + 0 $ 0C / $ - .- �� = o @02 0) § o _ % < Lt U) _ •@ < 2 ° - b 0) D 7 $ 2 y 2 $ 7 / o a E / § R § 2 \ 2 / c \ / co \ / o_\ f \ $ \ k 2 I ) 0 E - 1, o % E = o -r o » 5 a U m e .- » c u e = o - d �� `- 0 o o o = � R = � I - H II 0 I LU .0 °- ° c ±tr, q a / d / / \ i- a ƒ 2 0 - = I b \ E E 8 D % ° I I w r % e \ - O CO 0 = ri - 6 C > \ 7 R o \ d ® o + = = ® e - \ ° m = a / > S = = e & E r o 5 k 2@ \ = o ,- o �� U 2 e g _ o \ g z 0_ o c ® m E > [ e = = b 0 > D > `- 9 ° W > W U N / o o .» n .[ .c R E CO > $ / 0 y / c - c \ • -c 7 G / o ” > $ \ \ ii _o \ I co \ \ k f / / - 2 0 > 2 \ $ / 2 q > / . / / = I E w `,= =', 6 2 & E R c & _c W 0 / t O \ CC o 2 $ t / % / / / \ \ \ \ / \ N- 0) N- co TREE+= 4-1116"a ` E L L F E A D F M C _w 3 SA NOTES: WELL ANGLE>70° 9015' . ACTUATOR= BAKER C ***4-1/2"CHROME TBG&7"LNR"' OKB.ELEV= 70.5' BF.ELEV= NA KOP= 8149' Max Angle= 97 @ 10350' 2008' H4-112"X NP,D=3.813" Datum WD= 8989' GAS UFT MANDRELS Datum TV D= 8800' SS ST MD TV D DEV TYPE VLV LATCH PORT DATE 20"CONDUCTOR 91.5#,H-40,19.124" H 114' 4 3029 3028 1 MMG DM*' RK 0 09/10/13 3 5031 5029 1 MMG DM' RK 0 09/10/13 2 6861 6859 0 MMG DMY RK 0 04/11/08 13-3/8"CSG,68#,L-80,D=12.415' 3530' 1 7981 7979 5 MMG DMY RK 0 04/11/08 Minimum ID =2.377" @ 8754' 8062' —14-1/2"X NP,D=3.813" 3-3/16" X 2-7/8" CROSSOVER =, =, 8092' 9-5/8"X 4-1/2"BKR S-3 PKR,D=3.875" 8127' H4-1/2"X NP,ID=3.813" TOP OF 7"LNR 1—I 8165' — 8165' —19-5/8"X 7"1TBACK SLV J I 8173' —9-5/8"X 7"TNV LTP w/LNR HGR,13=6.276' 9-5/8"CSG,47#,L-80 NSCC,D=8.681" 1—i 8327' 8591' _1-14-1/2"BKR KB LTTP(08/09/10) w ►c 'TOP OF 2-7/8'LNR H 859r _ ,� 8592' 1-13-1/2-DEPLOY SLEEVE,D=3.000' ►i ■ 8604' 1-13-1/2-PUP JT,D=2.992" 4 ► 1 8614' 1-13-1/2"OTIS X NP,D=2.812' 1 ►' • 4-112"TBG,12.6#,13CR-80 VAM TOP, -j 8621' 1 �.4 ••� 8621' H4-1/2"WNLEG,D=3.958"-• .0152 bpf,D=3.958" ►•••4 •�•• 3-1/2'LNR,9.3#,L-80 STL,.0087 bpf,D=2.992' H 8657' ►� •• r" ►#r♦ 8657' —I 3-1/2"XOTO3-3/16",0=2.786" r LNR,26#,L-80 NSCC XO TO 13CR NSCC —1 8665' "*. k:+ 7'LNR,26#,13CR NSCC,.0383 bpf,ID=6.276" H 8689' — ��:4• �•:" MLLOUT WINDOW(15-32B) 8690'-8695' 7"GEN 1 W-IPSTOCK(07/04/10) 8689' •*,sue • PERFORATION SUMMARY ' REF LOG:BH MWDIGR ON 11/04/01 ANGLE AT TOP FERF:93°@ 10017' li _Note:Refer to Production DB for historical pert data 8754. 3 3/16"XO TO 2-7/8 SEE SPF 1YTBRVAL Opn/Sqz SHOT SO7 ►•4i ■ 2" 6 9317-9437 S 07/18/10 11/14/13 r0: V D=2.377" 2" 6 9537-9797 S 07/18/10 11/14/13 ��� �� 2" 6 10017-10137 0 07/18/10 ` 2" 6 10317-10527 0 07/18/10 ` 2" 6 10637-10677 0 07/18/10 ` 2" 6 10757-10787 0 07/18/10 ` 2" 6 10837-10877 0 07/18/10 3-3/16"LNR,6.2#,L-80 TC1, —1 8754' ` 2" 6 10927-11237 0 07/18/10 .0076 bpf,ID=2.80" 2" 6 11287-11307 0 07/18/10 ` 2" 6 11387-11477 0 07/18/10 FISH:MLL®8 PUSHED CBP(11/28/13) -1 11537'CTM �` MID H 11584' I rQi► 2-7/8'LNR 6.5#,L-80 STL,.0058 bpf,D=2.441" —1 11624' ,. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNT 04/28/94 09 ORIGINAL COMPLETION 09/13/13 DUS/JM3 GLV C/O(09/10/13) WELL: 15-32B 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) 12/03/13 TTR/JM7 SET CBR'SOZ CMT(11/14/13) PERMIT No:"L 100620 04/11/08 D16 RWO 12/03/13 TFAI.M) MLLED CBP 8 PUSF®DH(11/28/1; API No: 50-029-22462-02 07/18/10 NORDIC 2 CTD SIDETRACK(15-32B) SEC 22,T11N,R14E,1676'FNL&333'FWM. 07/26/10 PJC DRLG DRAFT CORRECTIONS 09/19/10 MpPJC FNAL DRLG CORRECTIONS BP Exploration(Alaska) CI iIL[ o �"../ U0 5 - c) all k. ❑ ❑ ❑ ❑ ❑ i7 =" ;� r M V V �s N Z 6 w O Vv y v) `v 0 Z . o N Cj .� 1 v .0 ► _' ' E ti' = , o �. as Ln N o wo co tI; M � M = 'II ea , H RS� .X ✓M x a9Y CO C°Z c9 rE: ;t., Z Z Z Z Z ;LL LL LL LL LL '00000 6- 1- 1- I- I- . - 0 ❑ ❑ ❑ ❑ ' W W W W W I M Lo r-1 O I, zi ii ❑ H . 1 M- 0A' rtn ,`;-., co TIMM e is 7t ,, L. N M N O �D N \ 0 CD:a :..cl 0 0 0 0 0 T O O O O fl 1 AD O O O k';'1 c�3 N X n U 7 U TD 6, Q (4r U U m m m e `� as 4.7 - a ira m �� < CTS 4u: 011 m Q - yV .,- 92 < r O M M o )1% v r BAKER HU/tGHES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME 15-32BPB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 3/21/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: LAUREN VERONIE SO#:3252947 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: E V mAR 26 c9/U-OCo C MT. Page 1 of 1 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage,Alaska 99501 Attention: Christine Mahnken Reference: 15-32BPB1 Contains the following: ;: a; 1 LDWG Compact Disc g (Includes Graphic Image files) it 1 LDWG lister summary ;p { 1 color print—GR Directional Measured Depth Log (to follow) Ir s Il LAC Job#: 3252947 Sent by: Lauren Veronie Date: 3/2 l ; A.„.:),..... Received by: Date: WAR n w*.cnrowtis3ice PLEASE ACKNOWLEDGE RECEIPT B I' ETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ fan 7260 Homer Drive BAKER Anchorage,Alaska 99518 MIIGINES g Direct: (907)267-6612 INTEQ FAX: (907)267-6623 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken : 4i Reference: 15-32B Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print— GR Directional Measured Depth Log (to follow) 1 color print—GR Directional TVD Log (to follow) LAC Job#: 3252947 Sent by: Debbie Hoke Date: 11/18/2010 Received by: Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 069.O TAM Geoscience Advisor HUGHES BAKER 795 East 94th Avenue Anchorage,Alaska 99515 Q CPO 1 INTEQ Direct:(907)267-6612 FAX:(907)267-6623 BAKER MVaMES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME 15-32B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 11/18/2010 THIS DISTRIBUTION LIST AUTHORIZED BY DEBBIE HOKE SO#:3252947 Copies of Copies Digital Copies of Copies Digital Each Log of Files Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC I Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-I Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 l Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company p Y P Y Person Person Address Address Data Disseminated Bv:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed Bv: Page 1 of 1 bp Date 10-22-2010 Transmittal Number:93166 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02-36A G. go 0'6'5 02-36AP B 1 15-328 �Co a Oa's9 15-32BP61 O D-11B 90943 E-02B a/D Ut ac aOt l —E=3mL1 di o — vlo! 00a.4)0 ' Please . • Return one copy of this transmittal. Thank e • Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ICI Petrotechnical Data Center LR2-1 900 E. Benson Blvd.PO Box 196612 Anchorage,AK 99519-6612 Corrected 8/24/2010 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1 b. Well Class: 20AAC 25.105 2OAAC 25.110 ® Development ❑Exploratory ❑ GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 7/19/2010 210-062 3. Address: 6.Date Spudded:.445/20/o 4 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 702010 ✓ /R1-4I 50-029-22462-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 7/15/2010 PBU 15-32B 1676'FNL,333'FWL, SEC.22,T11 N, R14E, UM , Top of Productive Horizon: 8. KB(ft above MSL): 70.05' 15.Field/Pool(s): 1709'FNL,497'FWL,SEC.22,T11 N, R14E, UM GL(ft above MSL): 33.3' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 711'FSL, 13'FEL,SEC. 16,T11 N, R14E, UM 11584' 8816' ---- - -------- 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 676277 y- 5959812 Zone- ASP4 11624' 8816' ADL 028306 TPI: x- 676442 y- 5959783 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 675870 y- 5962191 Zone- ASP4 None None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 MC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, ROP. PRESS, RES, MCNL, MEMORY GR, CCL 8687' 8643' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT, GRADE TOP I BOTTOM To I BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 34' 114' 34' 114' 30" -260 sx Arctic Set 13-3/8" 68# L-80 35' 3530' 35' 3529' 16" 1170 sx Permafrost'E'. 375 sx Class'G' 9-5/8" 47# L-80 32' 8327' 32' 8319' 12-1/4" 610 sx Class'G' 7" 26# , L-80/13Cr 8165' 8687' /8161' 8643' 8-1/2" 280 sx Class'G' 3-1/2"x 3/3-16" 9.3#/6.2# L-80 8592' 11624' 8563' 8816' 4-1/8" 165 sx Class'G' ./ X 2-7/8" /6,5# 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 spf 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80 8621' 8092'/8089' MD ND MD ND 9317'-9437' 8887'-8880' 10757'-10787' 8833'-8831' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 9537'-9797' 8879'-8873' 10837'-10877' 8829'-8827' 10017'-10137' 8862'-8854' 10927'-11237' 8824'-8822' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 10317'-10527' 8840'-8830' 11287'-11307' 8821'-8821' 2500' Freeze Protected w/50 Bbls of Diesel 10637'-10677' 8835'-8835' 11387'-11477' 8818'-8819' 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): July 22,2010 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 8/10/2010 6 Test Period 4 267 3,867 -0- 25 14,463 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-McF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 1,950 1,400 24-Hour Rate ♦ 1,069 15,468 -0- Not Available 28. CORE DATA Conventional Core(s)Acquired? ❑ Yes 0 No Sidewall Core(s)Acquired? ❑Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),an• :,•,i -.,1. logy and =Kos or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips, hoto r .hs a•. r. . � AAC 250.071. ' i if i IV None .44,412, i, AThi 2, 4 2010 �+�fa s C6M'.Commission RBDMS AUG 2 5 2010 1�sk '�- faictialrs�ge Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only /- 2�-/I �/ G 29. GEOLOGIC MARKERS(List all formations and rn .rs encountered): 30. )ORMATION TESTS NAME MD ND Well Tested? ❑Yes 0 No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. 23SB/Zone 2B 8710' 8662' None 22TS 8773' 8720' 21 TS/Zone 2A 8842' 8778' Zone 1B 8904' 8821' TDF/Zone 1A 9006' 8877' Formation at Total Depth(Name): TDF/Zone 1A 9006' 8877' 31.List of Attachments: Summary of Daily Drilling Reports,Well History(Post Rig Sidetrack),Well Schematic Diagram and Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra tewman ,. a'_ . Title: Drilling Technologist Date: Vv"a4/- 1 D PBU 15-32B 210-062 Prepared By NamelNumber. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Sean McLaughlin,564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE_ 4-1/16"CIW SAFEI . .10TES: WELL ANGLE>70°@ 9015' WELLHEAD= FMC KB. = BAKER C PJC DRAFT 1 5.3 2 B ***4-1/2"CRHOME TBG&7" LNR*** BF.ELEV= NA 1 KOP= 8149' Max Angle= 97°@ 10350' ' 2008' I--I4-1/2"X NIP,ID=3.813" Datum MD= 8989' Datum ND= 8800' SS GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 20"CONDUCTOR,91.5#,H-40, 19.124" -I 114' i 4 i, 4 3029 3028 1 MMG DOME RK 16 07/20/10 3 5031 5029 1 MMG SO RK 20 07/20/10 13-3/8"CSG,68#,L-80, ID=12.415" -I 3530' I 2 6861 6859 0 MMG DMY RK 0 04/11/08 1 7981 7979 5 MMG DMY RK 0 04/11/08 Minimum ID = 2.387" @ 8754' I I 8062' H4-112"X NIP, ID=3.813" I 3-3/16" X 2-7/8" CROSSOVER X 8092' H9-5/8"x4-12"BKR S-3 PKR, ID=3.875" I 1 1 I 8127' H4-1/2"X NIP, ID=3.813" I TOP OF 7"LNR H 8165' I-- J� 8165' 1-19-5/8"X 7"TIEBACK SLV I Z 8173' 1-19-5/8"X 7"TIW LTP w/LNR HGR,ID=6.276" I 9-5/8"CSG,47#,L-80 NSCC, ID=8.681" -I 8327' 1-41 • 8592' I-I 3-1/2"DEPLOY SLEEVE ID=3.000" I TOP OF 2-7/8"LNR 8592' ►, ► r ► 8604' -13-1/2"PUP JT,ID=2.992" I ►� • j4 I 8614' H3-1/2"OTIS X NIP,ID=2.812" I• ► • ►4 • 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, 8621' J • .••. 8621' H4-1/2"WLEG, ID=3.958" I .0152 bpf,ID=3.958" •�•� 0�•� ••�4 •••• 3-1/2"LNR,9.3#,L-80 STL, .0087 bpf, ID=2.992" H I 8657' �.∎. 8657' _I-13-1/2"XO TO 3-3/16", ID=2.786" I 7"LNR,26#,L-80 NSCC XO TO 13CR NSCC H 8665' •••• ►•••• •40.• ■►• • •• 7"LNR,26#,13CR NSCC,.0383 bpf,ID=6.276" --I 8689' I V �••:• ••, • MILL WINDOW(15-32B) 8690'-8695' 7"GEN II WHIPSTOCK(07/04/10) H 8689' Os.• PERFORATION SUMMARY lar....71 .4 , REF LOG:BHI MWD/GR ON 11/04/01 ANGLE AT TOP PERF:96°@ 9317' Note:Refer to Production DB for historical perf data �, I 8754' I 3-3/16"XO TO 2-7/8", SIZE SPF INTERVAL Opn/Sqz DATE ►!i .•N 1 ID=2.387" 2" 6 9317-9437 0 07/18/10 0'4 '4' ` 2" 6 9537-9797 0 07/18/10 S. 2" 6 10017-10137 0 07/18/10 ` 2" 6 10317-10527 0 07/18/10 ` 2" 6 10637- 10677 0 07/18/10 2" 6 10757- 10787 0 07/18/10 3-3/16"LNR,6.2#,L-80 TCII, -I 8754' I ` 2" 6 10837- 10877 0 07/18/10 S. 2" 6 10927- 11237 0 07/18/10 .0076 bpf,ID=2.80" ` 2" 6 11287- 11307 0 07/18/10 PBTD 11584' 2" 6 11387-11477 0 07/18/10 A. 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441" -I 11624' I Am. ei � DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/28/94 D9 ORIGINAL COMPLETION 07/27/10 PJC DRAWING CORRECTIONS WELL: 15-32B 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) 07/28/10 MK/PJC MIN ID CORRECTIONS PERMIT No:'2100620 04/11/08 016 RWO API No: 50-029-22462-02 07/18/10 NORDIC 2 CTD SIDETRACK(15-32B) SEC 22,T11N,R14E, 1676'FNL&333'FWL 07/26/10 PJC DRLG DRAFT CORRECTIONS 07/26/10 DAV/PJC GLV 0/0(07/20/10) BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 1 Operation Summary Report Common Well Name:15-32_DIMS I AFE No Event Type:MOBILIZATION(MOB) Start Date:7/3/2010 End Date:7/4/2010 X3-00W02-C(547,512.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/3/2010 08:00 - 14:00 6.00 MOB P PRE SET THE RIG DOWN AFTER BACKING OFF WELL TO REPLACE HARDLINE ON PUMP#1 14:00 - 14:15 0.25 MOB P PRE PJSM TO MOVE RIG OVER TO 15-32B 14:15 - 15:00 0.75 MOB P PRE MOVE RIG TO 15-32B 15:00 - 15:30 0.50 MOB P PRE PJSM TO SPOT RIG OVER 15-32B 15:30 - 16:30 1.00 MOB P PRE SPOT RIG OVER WELL 15-32B RIG ACCEPTED @ 15:30 16:30 - 18:00 1.50 MOB P PRE REMOVE TREE CAP&NU BOPE ONTO WELL HEAD 18:00 - 19:45 1.75 MOB P PRE LEVEL RIG 19:45 - 20:00 0.25 MOB P PRE PJSM TO FINISH NU OF BOPE 120:00 - 22:15 2.25 BOPSUR P PRE FINISH NU BOPE j 22:15 - 22:30 0.25 BOPSUR P PRE PJSM TO PT BOPE 6oP 122:30 - 00:00 I 1.50 BOPSUR P PRE PT BOPE AS PER NORDIC PROCEDURE&AOGCC 1 RFGIII ATIONS 7/4/2010 00:00 - 06:00 6.00 P PRE PT BOPE 06:00 - 06:20 0.33 BOPSUR P PRE CREW CHANGE&PJSM TO CONTINUE BOP TEST 06:20 - 08:15 1.92 BOPSUR P PRE CONTINUE BOP TEST 08:15 - 08:30 0.25 BOPSUR P PRE PJSM TO PU INJECTOR TO PT PACKOFF AND INNER REEL VALVE 08:30 - 09:00 0.50 BOPSUR P PRE PT PACKOFF&INNER REEL VALVE 09:00 - 09:30 0.50 BOPSUR P PRE PUMP SLACK MANAGEMENT 09:30 - 09:45 0.25 BOPSUR P PRE PJSM TO CUT PIPE TO LOOK FOR WIRE 09:45 - 10:20 0.58 BOPSUR P PRE CUT PIPE TO FIND WIRE 10:20 - 10:55 0.58 BOPSUR P PRE PREP TO MU SLB CTC 10:55 - 11:10 0.25 BOPSUR P PRE PULL TEST CTC TO 42K 11:10 - 11:20 0.17 BOPSUR P PRE MOVE INJECTOR OVER BUNG HOLE TO PUMP SLACK FORWARD 11:20 - 11:30 0.17 BOPSUR P PRE MEG TEST WIRE 11:30 - 12:00 0.50 BOPSUR N SFAL PRE WIRE NOT TESTING,SUSPECT PIG TAIL FROM REEL TO NEW SHACK IS THE PROBLEM.BHI 1 INVESTIGATING 12:00 - 12:30 0.50 BOPSUR N SFAL PRE FOUND BAD CONNECTION,MU UQC AND TERMINATE WIRE IN FLOW SUB Printed 8/10/2010 11:17:06AM • North America-ALASKA=BP Page 1 of 14. Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor.NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5©70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (ft) 7/4/2010 12:30 - 12:50 0.33 STWHIP P WEXIT PJSM TO PT BHI UCQ&FLOW SUB AND MU WINDOW MILLING BHA 12:50 - 13:15 0.42 STWHIP P WEXIT PT BHI TOOLS 13:15 - 13:40 0.42 STWHIP P WEXIT MOVE INJECTOR OVER BUNG HOLE TO PUMP SLACK FORWARD WHILE MAKING UP WINDOW BHA 13:40 - 14:00 0.33 STWHIP P WEXIT SLACKED PUMPED FORWARD AND BHA IS MADE UP,SHUT DOWN PUMP TO PU INJECTOR AND MAKE UP TO BHA 14:00 - 15:40 1.67 STWHIP P WEXIT RIH WITH WINDOW BHA AT MIN RATE TO 2500' THE INCREASE RATE TO DISPLACE FP FROM WELL 15:40 - 15:45 0.08 STWHIP P WEXIT STOP AND FLOW CHECK WELL FOR GAS,NO FLOW 15:45 - 16:10 0.42 STWHIP P WEXIT TIE IN FROM 8450' 16:10 - 16:15 0.08 STWHIP P WEXIT CORRECT DEPTH-3'AND RIH I WT CK AT 8600'=40K 16:15 - 16:30 0.25 STWHIP P WEXIT TAG WS AT 8688.5'PU 10'AND RRINel PI IMP _ -ONLINE AT 2.5 BPM SWAP TO GEOVIS 16:30 - 16:40 0.17 STWHIP P WEXIT START TIME MILLING FIRST 1'(a7 1 FPH 16:40 - 17:30 0.83 STWHIP N DFAL WEXIT PU OFF BOTTOM,MWD NOT WORKING NO COMMS TO MWD AND WO A FUNCTIONING DISCONNECT WE NEED TO POOH SLB MECHANIC HERE TO LISTEN TO INJECTOR BECAUSE THERE WAS A LITTLE CHATTER WHILE WE WERE RIH 17:30 - 19:15 1.75 STWHIP N DFAL WEXIT POOH FROM 8400' PJSM WITH CREW TOLD MILLING BHA WHEN 15 MINUTES FROM SURFACE 19:15 - 20:15 1.00 STWHIP N DFAL WEXIT LD BHA&TROUBLESHOOT MWD TOOLS SWAP OUT MWD TOOLS 20:15 - 22:30 2.25 STWHIP N DFAL WEXIT RIH WITH NEW TOOLS TO 8,450' LOG TIE IN FROM 8,450'TO 8,490' -4'CORRECTION UP WT 37K CONTINUE TO RIH&TAG TOWS(07 8,690' 22:30 - 00:00 1.50 STWHIP P WEXIT MILL WINDOW PU TO 8,680' BRING PUMPS UP TO RATE FS 2,850 PSI @ 2.5 BPM RIH&TAG TOWS WITH PUMPS ON a)8,689.3' TIME MILL THE FIRST 1'@ 1 FPH&50-100 PSI MTR WK,.5K-1.5K WOB Printed 8/10/2010 11:17:39AM North America ALASKA-BP Page 2af 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor.NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM (i4A Active Datum:70.5©70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/5/2010 00:00 - 06:15 6.25 JE TP P wEXIT CONTINUE MILLING WINDOW FROM 8,690.3' FS 2,850 PSI©2.5 BPM ADJUST MILLING AS PER NEW LARGE DIAMOND WINDOW MILL PROCEDURE 00:05=8,690.7',3,080 PSI,3.1K WOB 00:30=8,691.3',3,058 PSI,3.9K WOB 01:10=8,692',3,098 PSI,4.7K WOB NAV) 01:45=8,692.3',3,040 PSI,4.3K WOB 02:20=8,692.6',3,000 PSI,3.6K WOB 03:00=8,693.3',3,000 PSI,4K WOB 03:30=8,693.7,2,940 PSI,3.4K WOB 04:00=8,694.3,2,941 PSI,4K WOB 04:30=8,694.5',2,940 PSI,3.8K WOB 05:00=8,694.8',2,980 PSI,3.9K WOB 05:30=8,695.2',3,000 PSI,3.7K WOB 06:00=8695.6',2974 PSI,MWD SHACK POWER OUTAGE 06:15 - 07:50 1.58 STWHIP P WEXIT MWD SHACK POWER BACK ON PU TO ZERO WOB FS=2780 PSI,FIRST MOTOR WORK AT 8694.6' 06:30=8695.6',2922 PSI,3.0k WOB 07:00=8696.0',3080 PSI,3.7k WOB 07:30=8696.4,3150 PSI,3.8k WOB 07:50 - 11:30 3.67 STWHIP P WEXIT 8696.7'CT PRESSURE RAMPED UP TO 3310 PSI &WOB INCREASED 400#LOOKS LIKE WE ARE MILLING FORMATION,BHI HAND THINKS WE V/ EXITED ABOUT 8695.8' FS 2780 PSI 2.5 BPM IN/OUT BHP/ECD/TVD:4473 PSI/10.13 PPG/8592' IAP/OAP/PVT:171 PSI/0 PSI/344 BBLS 08:00=8696.7',3215 PSI,3.4K WOB 08:30=8698.2',3197 PSI,4.2K WOB 09:00=8699.5',3157 PSI,4.3K WOB 09:30=8702.0',3222 PSI,4.1K WOB 10:00=8703.7,3193 PSI,4.4k WOB 10:30=8704.7,3153 PSI,4.1k WOB 11:00=8705.6,3190 PSI,5.3k WOB 11:30 - 12:05 0.58 STWHIP P WEXIT MILLED 10'OF OH TO 8706' DRESS WINDOW REAMING UP AND DOWN 3 PASSES Q 1FPM 2772 PSI Q 2.5 BPM IN&OUT IA/OA/PVT=188 PSI/0 PSI/346 BBLS 12:05 - 12:30 0.42 STWHIP N WEXIT BHI GENERATOR SHUT DOWN AGAIN,KEEP COMING UP UNTIL WE HAVE COMMS TO TOOL FOR DRY DRIFT 12:30 - 12:55 0.42 STWHIP N WEXIT DRY DRIFT WINDOW CLEAN AND TAGGED AT 8706'.BHI GENERATOR DIED AGAIN WHEN WE WERE BELOW THE WINDOW,TRUCK TO MOVE SAT CAMP IS ON THE WAY AND WE WILL PROBABLY SWAP BHI BACK TO SAT CAMP BEFORE DRILLING BECAUSE OF POWER ISSUES 12:55 - 13:00 0.08 STWHIP P WEXIT OPEN EDC AND CIRCULATE OOH 13:00 - 13:15 0.25 STWHIP N WEXIT RIG LOST POWER Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 3 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor.NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:15 - 14:20 1.08 STWHIP P WEXIT POOH 14:20 - 14:40 0.33 STWHIP P , WEXIT PJSM TO LD WINDOW BHA AND MU BUILD BHA 14:40 - 15:35 0.92 STWHIP P WEXIT OOH CLOSE EDC AND CHECK FOR FLOW NO FLOW,LD WINDOW BHA WINDOW&STRING MILL BOTH GAUGED 3.80 GO 3.79 NO-GO AND NOT MUCH WEAR ON FACE OF MILL 15:35 - 15:50 0.25 DRILL P PROD1 PJSM TO PU BUILD BHA 15:50 - 16:35 0.75 DRILL P PROD1 PU BHA TEST TOOL 16:35 - 17:10 0.58 DRILL P PROD1 RIH 2'AND TAGGED 17:10 - 17:25 0.25 DRILL N SFAL PROD1 CAN'T GET DOWN TAGGING 2'FROM TAG UP, PJSM TO PU INJECTOR AND INSPECT BHA 17:25 - 17:45 0.33 DRILL N SFAL PROD1 PU INJECTOR AND TRY WIGGLING PAST.NO GO,BO MWD AND LOOK AT BHA 17:45 - 19:20 1.58 DRILL N SFAL PROD1 PU INJECTOR TO SEE IF INJECTOR WILL RIH PROBLEM IS THE INJECTOR.LOWER INJECTOR TO TROUBLE SHOOT PROBLEM.REMOVED LUBRICATOR FROM BOTTOM OF INJECTOR FOR CLOSER INSPECTION INJECTOR BALLED UP WITH STEEL SHAVINGS WHICH GOUGED BOTTOM 15'OF COIL. 19:20 - 19:35 0.25 DRILL N SFAL PROD1 PJSM TO PU BHA&STAND BACK IN THE DERRICK 7 CUT GOUGED COIL 19:35 - 19:55 0.33 DRILL N SFAL PROD1 STAND BHA BACK IN DERRICK 119:55 - 21:30 1.58 DRILL N SFAL PROD1 CUT 23.75'OF GOUGED COIL FROM REEL INSTALL SLB CTC REINSTALLED LUBRICATOR 21:30 - 21:55 0.42 DRILL N SFAL PROD1 RE-HEAD COIL WITH BHI UQC PULL&PRESSURE TEST UQC TEST GOOD 21:55 - 22:10 0.25 DRILL N SFAL PROD1 PJSM TO PU BHA&LOWER IN HOLE STAB ON INJECTOR 22:10 - 22:25 0.25 DRILL N SFAL PROD1 PU BHA&LOWER IN HOLE STAB ON INJECTOR 22:25 - 22:30 0.08 DRILL N SFAL PROD1 PJSM WITH NORDIC&SLB DRILLER FOR TIH 22:30 - 00:00 1.50 DRILL P PROD1 TEST BHI TOOLS @ SURFACE RIH WITH BUILD ASSY 7/6/2010 00:00 - 00:30 0.50 DRILL P PROD1 RIH WITH BUILD BHA TO 8,450' FLOW CHECK WELL 00:30 - 05:50 5.33 DRILL C PROD1 SWAP BHI EQUIPMENT&COMPUTERS FROM BHI TRAILER BACK INTO SATTELITE CAMP DUE TO INTERMITTENT POWER SUPPLY IN TRAILER TO ENSURE UNINHIBITED COMMUNICATION WITH DOWNHOLE TOOLS 05:50 - 06:15 0.42 DRILL P PROD1 LOG TIE WITH-2'CORRECTION CONTINUE TO RIH THRU WINDOW TAG BOTTOM @ 8,701' PU&BRING PUMPS ONLINE Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 4.of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:15 - 07:30 1.25 DRILL P PROD1 DRILL BUILD FROM 8,701' FS 2,850 PSI @ 2.5 BPM STALL©8,715' 06:45=8,716',100 PSI MTR WK,1.4K WOB, 10.11 ECD 07:30 - 08:35 1.08 DRILL P PROD1 DRILLED TO 8728'AND THE DD LOST HIS MWD SCREEN.PU ABOVE WINDOW WHILE BHI FIGURES OUT PROBLEM 08:35 - 10:00 1.42 DRILL P PROD1 CONTINUE DRILLING 10:00 - 12:30 2.50 DRILL P PROD1 DRILLING AHEAD 3190 PSI DHWOB 1.2K TO 2.0K 2.5 BPM IN&OUT IA/OA/PVT=138 PSI/0 PSI/341 BBLS DRILL TO 8850' 12:30 - 14:00 1.50 DRILL P PROD1 LOG MOTHER BORE/RA TIE IN. RA TAG AT 8693'. TQ,P WS AT 8683'. TOP OF WINDOW:8687' BOT OF WINDOW:8693.5' 14:00 - 17:15 3.25 DRILL P PROD1 DRILL AHEAD FROM 8850'. 2830 PSI FS AT 2.47 BPM IN/OUT.200-300 PSI MTR WORK. 2.5-3.0K#DHWOB. RATTY DRILLING. AVG 40 DEG DOG LEG. 17:15 - 19:30 2.25 DRILL N DPRB PROD1 DGS AND NEAR BIT INCLINATION BOTH SUDDENLY JUMPED BY 2 DEG. NOT SURE WHY. SUSPECT A TOOL PROBLEM,ALTHOUGH ALL OTHER PARAMETERS APPEAR NORMAL. DECIDE TO PULL TOOL DUE TO INC UNCERTAINTY IN CRITICAL PART OF THE BUILD SECTION. FAULTY WIRE CONNECTION @ SURFACE FOUND TO BE THE CAUSE 19:30 - 22:15 2.75 DRILL N DPRB PROD1 PU TO 8,715'&LOG TIE IN NO CORRECTION NEEDED RIH TO 8.944' RE-LOG SURVEYS TO INSURE ACCURACY FOR MISSING SECTION RIH TO TD 22:15 - 23:50 1.58 DRILL P PROD1 DRILL BUILD FROM 8,981' FS 2,980 PSI©2.6 BPM 22:30=9,003',500 PSI MTR WK,1.6K WOB, 10.17 ECD STALL @ 9,010',9,022' 23:00=9,023',400 PSI MTR WK,2.7K WOB, 10.18 ECD 23:35=9,054',410 PSI MTR WK,2.5k WOB, 10.19 ECD TD BUILD©9,065' PJSM WITH SLB&NORDIC DRILLERS ROR POH 23:50 - 00:00 0.17 DRILL P PROD1 POH 4K OVERPULL WHEN COMING THROUGH TUBING TAIL Printed 8/10/2010 11:17:39AM North America-"ALASKA-BP Page 5 of 14 Operation Summary>Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 Qc 70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/7/2010 00:00 - 02:00 2.00 DRILL P PROD1 POH FOR LATERAL ASSY PJSM TO SWAP BUILD BHA FOR LATERAL BHA 15 MINUTES FROM SURFACE FLOW CHECK WELL SURFACE-NO FLOW 02:00 - 03:30 1.50 DRILL P PROD1 POP OFF INJECTOR ADJUST MOTOR ANGLE FROM 3.6 DEG TO 1.2 DEG PU HYC RZR EDGE BIT 03:30 - 05:45 2.25 DRILL P PROD1 CHECK EQUIPMENT©SURFACE RIH WITH LATERAL BHA LOG TIE IN-4'CORRECTION WORK THROUGH SHALE 8,984' TAG TD©9,066' 05:45 - 09:00 3.25 DRILL P PROD1 DRILL AHEAD FROM 9,066' FS 3,050 PSI©2.5 BPM IN/OUT. 300-350 PSI MTR WORK. DHWOB:0.5-1.0 K#. BHP/ECD/TVD:4653 PSI/10.17 PPG/8816' IA/OA/PVT:250 PSI/0/373 BBLS. FREQUENT STALLS WITH HIGH ROP IN BETWEEN. RUN LIGHT WOB TO REDUCE STALLLING. DRILL TO 9165'. 09:00 - 13:45 4.75 DRILL P PROD1 DRILL AHEAD FROM 9165'. BEGIN MUD CHANGE. DISCUSS MANAGING FLUID VOLUMES WHILE MONITORING WELL RETURNS. HAVING SUBSTANTIAL PROBLEMS KEEPING THE BIT &MOTOR FROM STALLING. BIT GRABBING ON BTM,EVEN WITH NEW MUD AROUND. FOUND SOME MOTOR RUBBER IN RETURNS. 13:45 - 16:00 2.25 DRILL N DFAL 9,221.0 PROD1 ONCE FLUID VOLUMES ARE STABALE IN PITS, WIPER TO WINDOW. CIRC OUT OF HOLE FOR BIT/MOTOR CHANGE. PJSM FOR BHA CHANGE IN OPS CAB. 16:00 - 16:45 0.75 DRILL N DFAL PROD1 AT SURFACE.FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD MOTOR AND INSPECT BIT. BIT GREEN.(1-1) REPLACE MOTR. CHANGE AKO FROM 1.2 TO 1.3 DEG. STAB COIL. TEST TOOLS.GET ON WELL. 16:45 - 18:45 2.00 DRILL N DFAL PROD1 RUN IN HOLE. LOG TIE IN WITH-5'CORRECTION 18:45 - 21:15 2.50 DRILL P PROD1 DRILL LATERAL FROM 9,221' FS 2,450 PSI @ 2.6 BPM MULTIPLE STALLS WITH BIT GRABBING ON BTM 19:30=9,237',2,765 PSI,0.6K WOB,9.77 ECD 21:00=9,328',3,094 PSI,1.4K WOB,9.82 ECD DRILL TO 9,351' 25 STALLS TOTAL AVG ROP 52 FPH Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 6 of y4 Operation Summary Report Common Well Name:15-32 DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:15 - 22:15 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 22:15 - 00:00 1.75 DRILL P PROD1 DRILL LATERAL FROM 9,351' FS 2,650 PSI @ 2.6 BPM 23:00=9,372',2,775 PSI,0.9 K WOB,9.79 ECD 00:00=9,394',2,880 PSI,1.2K WOB,9.83 ECD 11 STALLS 7/8/2010 00:00 - 03:30 3.50 DRILL P PROD1 DRILL LATERAL FROM 9,394' FS 2,500 PSI @ 2.5 BPM 00:30=9,405',2,600 PSI,1.4K WOB,9.8 ECD MULTIPLE STALLS 02:40=9,471',2,830 PSI,0.9K WOB,9.87 ECD DRILL TO 9,498' 39 STALLS AVG ROP 30 FPH 03:30 - 04:30 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 04:30 - 07:30 3.00 DRILL P PROD1 DRILL LATERAL FROM 9,498' FS 2,430 PSI @ 2.4 BPM 05:00=9,511',2,700 PSI,0.9K WOB,9.85 ECD CONTINUE TO EXPERIENCE ON GOING STALLING PROBLEMS. APPEARS TO BE A STICK/SLIP ISSUE,POSSIBLY DUE TO WEIGHT XFER PROBLEMS IN CHROME TBG(?). DRILL TO 9536'. 07:30 - 10:00 2.50 DRILL N DPRB PROD1 HOLD PJSM TO DISCUSS FLUID MANAGEMENT WHILE TRIPPING. WIPER TO WINDOW. CIRC OUT OF HOLE. HOLD BHA PJSM NEAR SURFACE. 10:00 - 11:15 1.25 DRILL N DPRB PROD1 TAG UP. FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD MOTOR. BIT IN GOOD CONDITION 1-1. REPLACE MOTOR. ADD AGITATOR. MU USED HTC RWD BI-CENTER. STAB COIL. TEST TOOLS. GET ON WELL. PLAN IS TO ADD ADDITIONAL LUBES TO MUD TO HELP CHROME"FRICTION" 11:15 - 13:30 2.25 DRILL N DPRB PROD1 RUN IN HOLE. 13:30 - 13:45 0.25 DRILL N DPRB PROD1 LOG GR TIE INTO RA TAG. ADD 1' CORRECTION. 13:45 - 14:15 0.50 DRILL N DPRB PROD1 WIPER TO BOTTOM. HOLE CLEAN. Printed 8/10/2010 11:17:39AM • North America-ALASKA-BP Page 7 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay 1 Site:PB DS 15 Rig Name/No.:NORDIC 2 I Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:15 - 17:20 3.08 DRILL P PROD1 ORILL AHEAD FROM 9536'. 3150 PSI FS AT 2.50 BPM IN/OUT. 300-450 PSI MTR WORK. DHWOB:2.5-3.0 K# BHP/ECD/TVD:4547 PSI/9.93 PPG/8820 FT. IA/OA/PVT:260 PSI/0 PSI/420 BBLS. DRILL AHEAD WITH MINIMAL STALLING. SLIDING A MINOR BUT ONGOING ISSUE. REDUCE PUMP RATE TO 2.3 BPM IN OUT. SEEMS TO BE STALLING LESS. DRILL AHEAD TO 9700". 117:20 - 18:30 1.17 DRILL P PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 18:30 - 22:45 4.25 DRILL P PROD1 DRILL LATERAL FROM 9,700' FS 2,940 PSI @ 2.3 BPM 19:30=9,748'.3,380 PSI,3K WOB,9.89 ECD 20:30=9,783',3,420 PSI,1.7K WOB,9.97 ECD 21:30=9,813',3,280 PSI,3.7K WOB,9.88 ECD 22:30=9,841',3,400 PSI,3.1K WOB,9.91 ECD DRILL TO 9,853' AVG ROP 35 FPH ,/ 22:45 - 00:00 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW Y 7/9/2010 00:00 - 00:20 0.33 DRILL P PROD1 CONTINUE WIPER TRIP WIPER CLEAN 00:20 - 00:30 0.17 DRILL P PROD1 DRILL LATERAL FROM 9,853' FS 3,000 @ 2.3 BPM DRILL TO 9,856' HOT FAILURE 00:30 - 03:10 2.67 DRILL N DFAL PROD1 POH DUE TO HOT FAILURE OPEN EDC WHEN ABOVE WINDOW POH PJSM TO SWAP OUT HOT 15 MIN FROM SURFACE 03:10 - 03:25 0.25 DRILL N DFAL PROD1 PJSM TO SWAP HOT ON BHA 03:25 - 04:25 1.00 DRILL N DFAL PROD1 SWAP HOT&DGS OUT ON BHA 04:25 - 06:00 1.58 DRILL N DFAL PROD1 TEST TOOLS @ SURFACE PJSM WITH SLB&NORDIC DRILLERS FOR TIH RIH WITH LATERAL BHA 06:00 - 06:15 0.25 DRILL N DFAL PROD1 LOG GR TIE IN. SUBTRACT 6'CORRECTION. 06:15 - 06:45 0.50 DRILL N DFAL PROD1 WIPER TRIP BACK TO BTM. HOLE SMOOTH. Printed 8/10/2010 11:17:39AM • North America-ALASKA=BP Page 8 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:45 - 12:30 5.75 DRILL P PROD1 DRILL AHEAD FROM 9856'. 3150 PSI FS AT 2.30 BPM IN/OUT. 300-400 PSI MTR WORK. 3-4K#DHWOB. BHP/ECD/TVD:4590 PSI/10.01 PPG/8827' IA/OA/PVT:339 PSI/0 PSI/412 BBLS. SUSPECT KAVIK HAS BEEN CONTACTED. BUILD ANGLE TO DRILL BACK UP THROUGH ZONE 1A TO ATTEMPT TO LOCATE ANY GOOD SAND TO PLAN A SIDETRACK. DRILL TO 10,000' 12:30 - 14:30 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW. MOTOR WORK AND SOME PULLS NOTED FROM 9950 TO 9750'. 3230 PSI FS AT 2.41 BPM IN. HOLE SMOOTH WHILE RIH. 14:30 - 18:00 3.50 DRILL C PROD1 DRILL AHEAD FROM 10,000. 3150 PSI FS AT 2.30 BPM IN/OUT. 300-400 PSI MTR WORK. 3-4K#DHWOB. BHP/ECD/TVD:4590 PSI/10.01 PPG/8827' IA/OA/PVT:339 PSI/0 PSI/412 BBLS. DRILL TO 10,150' 18:00 - 20:00 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW 20:00 - 21:00 1.00 DRILL C PROD1 DRILL LATERAL FRO 10,150' FS 3,100 PSI @ 2.3 BPM 20:30=10,192',3,600 PSI,1.7K WOB,10.18 ECD DRILL TO 10,240' FOUND 1B SANDS 21:00 - 00:00 3.00 DRILL C PROD1 POH TO ABOVE WINDOW&OPEN EDC CONTINUE TO POH 7/10/2010 00:00 - 00:30 0.50 DRILL C PROD1 POH FLOW CHECK WELL©SURFACE=NO FLOW= 00:30 - 00:45 0.25 DRILL C PROD1 PJSM TO LD LATERAL BHA 00:45 - 01:15 0.50 DRILL C PROD1 LD LATERAL BHA AAR FOR LD OF LATERAL BHA 01:15 - 01:30 0.25 DRILL C PROD1 PJSM TO CUT COIL 01:30 - 04:00 2.50 DRILL C PROD1 CUT 250'COIL FOR CHROME MANAGEMENT 1 RE-HEAD COIL PULL&PT CTC&BHI UQC 04:00 - 04:15 0.25 DRILL C PROD1 PJSM TO MU BILLET BHA 04:15 - 05:10 0.92 STKOH C PROD1 MU BILLET BHA STAB ON INJECTOR TEST TOOLS©SURFACE 05:10 - 07:15 2.08 STKOH C PROD1 RIH WITH BILLET BHA 07:15 - 07:30 0.25 STKOH C PROD1 LOG GR TIE IN. SUBTRACT 3'CORRECTION. 36K#UP,28K#DN WT. CLOSE EDC. Printed 8/10/2010 11:17:39AM • North America-ALASKA-BP Page 9 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,111N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 07:30 - 08:15 0.75 STKOH C PROD1 RUN IN HOLE VERY SLOWLY. PLACE TOP OF BILLET AT 9050'. PU TO UP WT 6(1tf- TO REMOVE COIL SLACK. PRESSURE COIL TO 4000 PSI. SETTING TOOL ACTIVATED. SET 2k#DN WT. NO MOVEMENT. PU IS CLEAN AT 36K#. 08:15 - 10:15 2.00 STKOH C PROD1 PULL OUT OF HOLE. MONITOR HOLE FILL. j I HOLD PJSM NEAR SURFACE. 10:15 - 12:30 2.25 STKOH C PROD1 aAT SURFACE. GET OFF WELL UNSTAB COIL. LD INTEQ TOOLS. LD BTT TOOLS. SETTING TOOLS LOOK NOMINAL. REMOVE TOOLS FROM RIG. 12:30 - 15:15 2.75 BOPSUR P PROD1 WEEKLY FUNCTION TEST OF BOPS. OPEN LOWEST RAM DOOR. NO METAL OR DEBRIS FOUND. TEST DOOR. LEAKING. REPLACE DOOR SEAL. TEST GOOD. 15:15 - 16:00 0.75 STKOH C PROD1 MU LATERAL BHA WITH 1.3 AKO,USED HCC BICENTER,AGITATOR. I` STAB COIL. TEST TOOLS. GET ON WELL. 16:00 - 17:30 1.50 STKOH C I PROD1 RUN IN HOLE. CIRC AT MIN RATE. 17:30 - 18:05 0.58 STKOH C PROD1 LOG GR TIE IN. -2'CORRECTION RIH TO TOP OF BILLET 18:05 - 20:10 2.08 STKOH C PROD1 TAG BILLET 9,049.1' START TIME DRILLING SIDETRACK @ 1 FPH AS PER RP FS 3,050 PSI @ 2.4 BPM TIME DRILL TO 9,050.1' DRILL KICK-OFF WITH 0.5K WOB&200 PSI MTRWORK GRADUALLY ADD WT&FINISH KICK OFF TO 9,066' 20:10 - 20:40 0.50 I DRILL C PROD1 I DRILL LATERAL FROM 9,066' FS 3,050 PSI @ 2.4 BPM 200-300 PSI MTR WK 0.5K TO 1.6K WOB DRILL TO 9,097' DATA PROBLEMS WITH BHI TOOLS 20:40 - 21:40 1.00 DRILL N DFAL PROD1 DATA PROBLEMS WITH BHI PU INTO CASED HOLE WHILE TROUBLESHOOTING PROBLEM CONFIRMED BHI DATA INPUT RIH TO TD 21:40 - 00:00 2.33 DRILL C I PROD1 I DRILL LATERAL FROM 9,097' FS 3,050 PSI @ 2.4 BPM 200-350 PSI MTR WK,1K-2K WOB,10.21 ECD SWAPPED TO NEW MUD SYSTEM DRILL TO 9,180' Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 10 of 14 Operation Summary Report Common Well Name:15-32_DIMS I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5©70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/11/2010 00:00 - 01:20 1.33 DRILL C PROD1 DRILL LATERAL FROM 9,185' FS 3,130 PSI @ 2.4 BPM 200-350 PSI MTR WK,1K-3.5K WOB,10.03 ECD DRILL TO 9,250' 01:20 - 02:05 0.75 DRILL C PROD1 WIPER TO WINDOW DROP PR TO 0.5 BPM WHEN PASSING BILLET 02:05 - 04:35 2.50 DRILL C PROD1 DRILL LATERAL FROM 9,250' FS 3,130 PPSI @ 2.4 BPM 200-400 PSI MTR WK,1K-3.5K WOB,10.03 ECD DRILL TO 9,400' 04:35 - 05:15 0.67 DRILL C PROD1 WIPER TO WINDOW DROP PR TO 0.5 BPM WHEN PASSING BILLET 05:15 - 05:40 0.42 DRILL C PROD1 GEO FOUND QUITE A BIT OF COAL IN SAMPLE OPEN EDC&JET 7"WHILE WAITING FOR GEO TO DECIDE WHICH DIRECTION TO DRILL 05:40 - 06:30 0.83 DRILL C PROD1 LOG TIE IN WITH+5'CORRECTION RIH 06:30 - 09:30 3.00 DRILL C PROD1 DRILL AHEAD FROM 9400'. 3250 PSI FS AT 2.32 BPM IN/OUT. 300-400 PSI MTR WORK. BHP/ECD/TVD:4622 PSI/10.11 PPG/8808 FT IA/OA/PVT:242 PSI/0 PSI/265 BBLS. DRILL TO 9550'. 09:30 - 10:00 0.50 DRILL C PROD1 WIPER TRIP TO WINDOW. HOLE SMOOTH. 10:00 - 12:15 2.25 DRILL C PROD1 DRILL AHEAD FROM 9550'. 3350 PSI FS AT 2.32 BPM IN/OUT ROP VARIABLE,AVG OVER 50 FPH. 12:15 - 12:45 0.50 DRILL C PROD1 WIPER TRIP TO WINDOW. HOLE SMOOTH. 12:45 - 15:00 2.25 DRILL C PROD1 DRILL AHEAD FROM 9700'. 3400 PSI FS AT 2.32 BPM IN/OUT. DRILL TO 9850' 15:00 - 16:00 1.00 DRILL C PROD1 WIPER TRIP TO WINDOW. CIRC OUT 7". LOG GR TIE IN.ADD 3'CORECTION. WIPER IN HOLE. HOLE SMOOTH. 16:00 - 21:00 5.00 DRILL C PROD1 DRILL AHEAD FROM 9850'. 3350 PSI FS AT 2.30 BPM IN/OUT. 300-450 PSI MTR WORK 2.5-3.5K#DHWOB. IA/OA/PVT: 347 PSI/0 PSI/244 BBLS(ACTIVE) DRILL AHEAD TO 10,000' 21:00 - 22:45 1.75 DRILL C PROD1 WIPER TRIP TO WINDOW 22:45 - 00:00 1.25 DRILL C PROD1 DRILL LATERAL FROM 10,000' FS 3,250 PSI @ 2.3 BPM 250-550 PSI MTR WK 1K-4K WOB,10.31 ECD DRILL TO 10,020 Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 11 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor.NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 7/12/2010 00:00 - 03:00 3.00 DRILL C PROD1 DRILL LATERAL FROM 10,020' FS 3,250 PSI©2.3 BPM 250-650 PSI MTR WK 1K-4K WOB,10.42 ECD DRILL TO 10,150' AVG ROP 43 FPH 03:00 - 04:50 1.83 DRILL C ' PROD1 1 WIPER TRIP TO WINDOW 04:50 - 06:30 1.67 DRILL C PROD1 DRILL LATERAL FROM 10,020' FS 3,350 PSI @ 2.3 BPM 250-650 PSI MTR WK 1K-4K WOB,10.42 ECD CREW CHANGE. DISCUSS OPERATIONS. MAKE RIG ROUNDS AND CHECKS. CONTINUE TO DRILL AHEAD. 06:30 - 09:15 2.75 DRILL P i PROD1 DRILL AHEAD FROM 10,225'. 3410 PSI FS AT 2.31 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. ROP:30-50 FPH. BHP/ECD/TVD:4771 PSI/10.47 PPG/8779 FT IA/OA/PVT:455 PSI/0 PSI/na. PREP FOR MUD SWAP. DRILL TO 10,300' ✓/ 09:15 10:30 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW. REDUCE RATE ACROSS BILLET AT 9050'. 2780 PSI FS AT 2.34 BPM IN. HOLE SMOOTH. 10:30 - 13:45 3.25 DRILL P PROD1 DRILL AHEAD FROM 10,300' 3200 PSI FS AT 2.40 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. VARIABLE ROP. AVG:30-40 FPH PUMP PRESSURE REDUCED WITH NEW MUD AROUND. DRILL TO 10450'. 13:45 - 16:25 2.67 DRILL P PROD1 WIPER TRIP TO WINDOW. _ 3100 PSI FS AT 2.40 BPM IN/OUT. 16:25 - 19:30 3.08 DRILL P PROD1 DRILL AHEAD FROM 10,450' 3200 PSI FS AT 2.40 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. VARIABLE ROP. AVG:30-40 FPH DRILL TO 10,600'. 19:30 - 21:30 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW SLOW PR WHEN PASSING BILLET 21:30 - 00:00 2.50 DRILL N SFAL PROD1 FOUND 2 BLOCK KEEPERS BROKEN ON THE CHAIN REDUCED PUMP TO MIN RATE 7/13/2010 00:00 - 01:30 1.50 DRILL N SFAL PROD1 CONTINUE REPLACING INJECTOR GRIPPER BLOCKS 01:30 - 02:30 1.00 DRILL P PROD1 CONTINUE WIPER TO TD Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 12 01 14 Operation Summary Report Common Well Name:15-32_DIMS I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 06:30 4.00 DRILL P PROD1 DRILL AHEAD FROM 10,600' FS 3,050 PSI @ 2.3 BPM 200-450 PSI MTR WK,1.5K-3.5K WOB,ECD 10.19 DRILL TO 10,750' AVG ROP 37.5'FPH 06:30 - 09:30 3.00 DRILL P PROD1 WIPER TRIP TO WINDOW. MOTOR WORK FROM 9040'TO 9000' OVERPULLS INSIDE 7"AS BIT AND MOTOR APPROACH THE TBG TAIL AT 8621'. OPEN EDC AND CIRC OUT 7'FROM ABOVE WINDOW AND TBG TAIL. 4.2 BPM AT 3750 PSI. WORK OPEN EDC ACROSS TBG TAIL. PULL UP THROUGH TBG TAIL WITH MIN RATE. MAX PULL WAS 49.7K#. BROKE BACK TO NORMAL UP WT OF 34K#. BRING PUMP UP TO FULL RATE AND PULL UP PAST TBG TAIL WITH BIT AGAIN. PROBLEM HAS CLEARED UP. 09:30 - 09:45 0.25 DRILL P PROD1 LOG GR TIE IN FROM 8720'. ADD 3' CORRECTION. 09:45 - 11:15 1.50 DRILL P PROD1 WIPER BACK TO BTM. 3329 PSI FS AT 2.49 BPM IN IN LATERAL SECTION. HOLE SMOOTH. 11:15 - 13:15 2.00 DRILL P PROD1 DRILL AHEAD FROM 10,750'. 3215 PSI FS AT 2.40 BPM IN/OUT. ROP VARIABLE:60-80 FPM,THEN STACK OUT. DRILL TO 10,900'. 13:15 - 14:45 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW. 3160 PSI FS AT 2.39 BPM IN. 14:45 - 21:00 6.25 DRILL P PROD1 DRILL AHEAD FROM 10,900'. 3450 PSI FS AT 2.51 IN/OUT. DRILL AHEAD TO 11050'MD. 121:00 - 22:45 1.75 DRILL P PROD1 WIPER TO WINDOW(CLEAN). 22:45 - 00:00 1.25 DRILL P PROD1 DRILL AHEAD FROM 11050'MD.PERFORM MUD SWAP TO NEW POWERVIS. DRILLING PARAMETERS AT 11169'MD: 3190 PSI AT 2.38 BPM W/FULL RETURNS AT 80 FPH ROP W/1.7K LB WOB AND 14200 LB SURFACE WEIGHT. PVT/ECD/BHP:111/9.97 PPG/4530 PSI. IAP:330 PSI OAP:0 PSI CONTINUED ON REPORT 07/14/2010 7/14/2010 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUED FROM REPORT 07/13/2010. IAP:330 PSI. OAP:0 PSI. DRILL AHEAD TO 11200'MD. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 13 of 14 Operation Summary Report Common Well Name:15-32 DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 05:40 3.67 DRILL P PROD1 WIPER TO WINDOW. OPEN ECD IN 7"LINER. JET LINER TO TT,THEN BACK DOWN TO TRAY OF WS AND BACK UP TO TT. NO INCREMENTAL CUTTINGS RETURN WAS NOTICED WITH THE BOTTOMS-UP ASSOCIATED WITH THIS JETTING RECIPROCATION.TIE-IN,CORRECTION OF(+7.5'). 05:40 - 06:25 0.75 DRILL P PROD1 DRILL AHEAD FROM 11,200' FS 3,150 PSI©2.3 BPM DRILL TO 10,214' 06:25 - 09:50 3.42 DRILL N DFAL PROD1 LOST COMMUNICATION WITH BHI TOOLS POH TO ABOVE WINDOW TO TROUBLE SHOOT TOOL P&C FAILURE POH TO SWAP OUT TOOLS PJSM TO SWAP OUT BHA WHILE POH 09:50 - 11:15 1.42 DRILL N DFAL PROD1 LD FAULTY BHA COMPONENTS "NOTE"2"OF STATOR SHAFT EXPOSED WHEN BHA WAS BROUGHT TO SURFACE,125HRS ON MOTOR.ALL HOURS ON MOTOR WERE RUN WITH AN AGITATOR. EXCESS VIBRATION FROM AGITATOR POSSIBLE CAUSE FOR MOTOR CONDITION 111:15 - 11:30 0.25 DRILL N DFAL PROD1 R FOR LD FAULTY BHA COMPONENTS TgLMUJ.AIERALBEEL BH 11:30 - 12:00 0.50 DRILL N DFAL PROD1 EW LATERAL BHA 12:00 - 15:00 3.00 DRILL N DFAL PROD1 TEST TOOLS©SURFACE RIH WITH LATERAL BHA ASSY LOG TIE IN WITH-4'CORRECTION CONTINUE TO RIH TO TD 15:00 - 18:00 3.00 DRILL P PROD1 DRILL LATERAL FROM 11.214' FS 2,960 @ 2.4 BPM 200-300 PSI MTR WK,1-3.5K WOB,10.08 ECD DRILL AHEAD TO 11350'MD. 18:00 - 21:00 3.00 DRILL P PROD1 WIPER TO WINDOW FROM 11350'MD,CLEAN. 21:00 - 00:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11350'MD. FREESPIN 3020 PSI AT 2.4 BPM DRILL AHEAD AT 2.4 BPM AT 3400 PSI W/2.1K LB WOB AND 16000 LB SURFACE WEIGHT WITH FULL RETURNS. PVT/ECD/BHP:257/10.22 PPG/ 4644 PSI. ROP—60 FPH. IAP:460 PSI OAP:0 PSI AT MIDNIGHT,DRLLING AHEAD AT 11449'MD. CONTINUED ON REPORT 07/15/2010. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page.14 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5©70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/15/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUED FROM REPORT 07/14/2010. IAP:460 PSI OAP:0 PSI. DRILLING AHEAD AT 11449'MD AT 2.4 BPM AT 3260 PSI W/1.2K LB WOB AND 18000 LB SURFACE WEIGHT WITH FULL RETURNS. PVT/ECD/BHP:252/10.06 PPG/4655 PSI. ROP: 55 FPH. DRILL TO 11500'MD. 01:00 - 04:00 3.00 DRILL P PROD1 WIPER TO WINDOW FROM 11500'MD. 03:30-FIRE DRILL(SIMULATING A FIRE IN THE SCR ROOM). 04:00 - 06:30 2.50 DRILL P PROD1 DRILL AHEAD FROM 11500'MD. DRILLING AHEAD AT 2.4 BPM AT 3625 PSI W/ FULL RETURNS W/1900 LB WOB AND 18000 LB SURFACE WEIGHT. PVT/ECD/BHP:237/10.06 PPG/4695 PSI. ROP:50 FPH. DRILL TO 11.620'TD 06:30 - 10:30 4.00 DRILL P PROD1 FINAL WIPER TO WINDOW PUMP LOW VIS SWEEP TO CLEAR OH ON WIPER **NO INCREASE IN CUTTINGS RETURNED TO SURFACE FROM LOW VIS SWEEP" PU TO TUBING TAIL&OPEN EDC JET 7"FROM TOWS TO WLEG LOG TIE IN WITH+5'CORRECTION PU TO 8,560'&LOG CCL TO 8,720' PU&CLOSE EDC 10:30 - 12:45 2.25 DRILL P PROD1 RIH TO TD 4 _ TAG RCONFIRM TD 11I24' 12:45 - 16:30 3.75 DRILL P PROD1 POH LAYING IN LINER RUNNING PILL WITH ALPINE BEADS PAINT EOP FLAG Q 8,450' PAINT TOP OF WINDOW FLAG Q 5,587' CONTINUE TO POH TO SURFACE FLOW CHECK WELL Q SURFACE*NO FLOW' 16:30 - 16:40 0.17 DRILL P PROD1 PJSM TO LD DRILLING BHA 16:40 - 17:00 0.33 DRILL P PROD1 LD DRILLING BHA. BIT GRADED 1,2(CHIPPED CUTTERS) END OF RON REPORT. CONTINUED ON CON REPORT 07/15/2010. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 1 015 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/15/2010 17:00 - 17:20 0.33 CASING P RUNPRD CONTINUED FROM RON REPORT 07/15/2010. PJSM FOR PUMPING SLACK. 17:20 - 19:30 2.17 CASING P RUNPRD PUMP SLACK. RECOVER 195'TOTAL ELINE (-83'SLACK THEORETICALLY REMAINING IN REEL). 19:30 - 21:15 1.75 CASING P RUNPRD PUMP 0.75"DRIFT BALL THORUGH CT AND RECOVER. 21:15 - 22:15 1.00 CASING P RUNPRD MU CTC. PULL TEST TO 40K-GOOD. PT TO 3600 PSI,GOOD. 22:15 - 22:45 0.50 CASING P RUNPRD PJSM FOR MU LINER. 22:45 - 00:00 1.25 CASING P RUNPRD MU LINER. CONTINUED ON CON REPORT 07/16/2010 7/16/2010 00:00 - 04:15 4.25 CASING P RUNPRD CONTINUED FROM CON REPORT 07/15/2010. CONTINUE MU AND DEPLOY LINER. 04:15 - 07:20 3.08 CASING P RUNPRD STAB ON. RIH WITH LINER RIH TO 11,620'GET PU WT OF 48.5K RIH&TAG TD CONFIRMED WITH FLAG UNCORRECTED @ 11,627.6' PU TO 11,608',RIH&CONFIRM TD UNCORRECTED @ 11,626.5' PU TO BALL DROP POSITION @ 11,604' 07:20 - 07:30 0.17 CASING P RUNPRD PJSM TO DROP&LAUNCH 5/8"STEEL BALL 07:30 - 08:40 1.17 CASING P RUNPRD LOCK OUR REEL BRAKE&PIN REEL LOAD 5/8"STEEL BALL LAUNCH BALL WITH 1,500 PSI / PUMP @ 2 BPM TO CHASE BALL OUT OF REEL ✓ LOST 10K WT STOPPED PUMPS RIH&TAG TD @ 11,626.5' PU&CONFIRMED PU WT 2 TIMES LINER STILL ATTACHED STACK 10K WT&CONTINUE PUMPING BALL BALL ON SEAT @ 32.8 BBLS PRESSURE UP TO&BREAK OVER @ 4,500 PSI PU WT BREAKOVER©11,623'@ 34K RIH&PU AGAIN TO CONFIRM LINER RELEASE 08:40 - 12:10 3.50 CEMT N WAIT RUNPRD WAIT FOR TRUCKS TO SWAP WELL TO KCL TRUCKS&DRIVERS UNAVAILABLE FROM CH2MHILL FOR FLUID DELIVERY/HAUL OFF CENTRAL DISPATCH UNREACHABLE(PHONE BUSY)TO ORDER PEAK TRUCKS UNTIL 08:50 AM 12:10 - 14:30 2.33 CEMT P RUNPRD CIRCULATE WELL TO 2%KCL DBL SLK BUILD 100 BBLS 2PPB BIOZAN PJSM WITH CEMENT CREW TO SPOT EQIPMENT& RU RU CEMENTERS WHILE SWAPPING WELL TO KCL [14:30 - 15:00 0.50 CEMT P RUNPRD PJSM FOR CEMENT JOB Printed 8/10/2010 11:18:23AM • North America-ALASKA-BP Page 2 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 17:40 2.67 CEMT P RUNPRD BYPASS HP SCREENS IN REELHOUSE BATCH UP CEMENT @ 15:20 PM PT CEMENTERS LINES TO 4,000 PSI PUMP CMT ZERO IN MM WHEN 15 PPG DENSITY IS SEEN �h r PUMP 34 BBLS OF CMT LINE UP TO PUMP 2 PPB BIOZAN / 'r_s/ CHASE CMT WITH 2 PPB BIO !�"� SHUT DOWN PUMPS @ 88 BBLS PU TO BREAK OVER @ 11,623.3'BO WT @ 39K PU AN ADDITIONAL 13'TO 11,610.3' SET BACK DOWN©11,616.9'STACK 10K ON COIL PRESSURE UP TO 500 PSI&HOLD PRESSURE PU&SEE PRESSURE DROP OFF OUT MM aQ 88.8BBLS SIDE EXHAUST 2 BBLS CMT&3 BBLS BIO ZAN OUT MM @ 93.8 BBLS SET BACK DOWN @11,619.8'&STACK 10K DOWN ON COIL PRESSURE UP&SHEAR LWP @ 3,050 PSI© 94.6 BBLS ON MM CALCULATED LWP BUMP @ 17.7 BBLS OR 112.3 BBLS TOTAL ON IN MM LWP BUMP @ 110.9 BBLS TOTAL ON MM PRESSURE UP TO 1,000 PSI OPEN BAKER CHOKE&CHECK FLOATS FLOATS HOLDING PRESSURE UP TO 500 PSI&PU PRESSURE DROPPED @ 11,612' CIRCULATE @ TOP OF LINER FOR 5 BBLS 17:40 - 20:00 2.33 CEMT P RUNPRD POH PUMPING @ 1 BPM W/FULL RETURNS. RETURNED—2 BBLS OF 11.0 PPG DENSITY CONTAMINATED CEMENT AS POOH. 20:00 - 20:50 0.83 CEMT P RUNPRD PJSM. UNSTAB. LD LINER RUNNING ASSEMBLY. RECOVER BALL. CONFIRM TOOL SHEARED AS DESIGNED. 20:50 - 21:30 0.67 CEMT P RUNPRD MU SWIZZLE STICK. JET STACK W/3 RECIPROCATIONS. CHASE OUT DEAD LEGS FROM SURFACE IRON. 21:30 - 22:30 1.00 CEMT P RUNPRD UNSTAB,LD SWIZZLE STICK. PSJM FOR MU CLEANOUT ASSEMBLY,LOGGING TOOL,CSH. 22:30 - 00:00 1.50 CEMT P RUNPRD MU AND DEPLOY CLEANOUT ASSEMBLY, LOGGING TOOL,CSH. IAP:85 PSI OAP:0 PSI CONTINUED ON REPORT 07/17/2010 Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 3 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/17/2010 00:00 - 04:00 4.00 CONDHL P OTHCMP CONTINUED FROM REPORT 07/16/2010 IAP:85 PSI OAP:0 PSI. CONTINUE MU AND DEPLOY CSH. BREAK CIRCULATION EVERY—35 JTS TO CONFIRM WORKSTRING IS NOT PLUGGED WI SCALE/DEBRIS. RECEIVE UCA RESULTS(IN PROGRESS)FROM SLB. CEMENT AT 500 PSI AT 9 HOURS 11 MINUTES AFTER START OF TEST. 04:00 - 04:50 0.83 CONDHL P i OTHCMP RIH W/CLEANOUT ASSEMBLY W/2.30"MII I / MCNL LOG IN CARRIER/CSH SPACER PIPE. CIRCULATE AT 0.35 BPM WHILE RIH W/FULL RETURNS. AT 5700'MD-0.35 BPM AT 375 PSI. 04:50 - 07:00 2.17 CONDHL P OTHCMP LOG MCNL DOWN FROM 8,080'@ 30 FPM TAG PBTD @ 11,585'UNCORRECTED 07:00 - 08:00 7(---/0 CONDHL I P OTHCMP CRICULATE PERF PILL TO BIT 08:00 - 09:00 1.00 CONDHL P OTHCMP LOG UP @ 60 FPM LAYING IN PERF PILL PAINT FLAG @ 11,000'MD LOG UP TO 8,080' 09:00 - 10:15 1.25 CONDHL P OTHCMP I POH WITH MCNL ASSY 10:15 - 10:30 0.25 PERFOB P OTHCMP PJSM TO LAOD PERF GUNS INTO THE PIPE SHED 10:30 - 11:30 1.00 PERFOB P OTHCMP LOAD PERF GUNS INTO THE PIPE SHED 11:30 - 11:45 0.25 PERFOB P OTHCMP PJSM TO LD MCNL BHA 11:45 - 16:00 4.25 PERFOB P OTHCMP LD MCNL BHA LD PH-6 CONNECT HEAD PIN TO CSH&FLUSH WITH FRESH WATER STAND BACK CSH IN DERRICK&LD MCNL ASSY 16:00 - 16:15 0.25 PERFOB P OTHCMP PJSM TO PT LINER LAP TO 2,000 PSI Printed 8/10/2010 11:18:23AM • North America-ALASKA-BP Page 4 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 Q70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:15 - 00:00 7.75 PERFOB P OTHCMP LINE UP&TEST LINER LAP PRESSURE UP TO 2,000 PSI PRESSURE BLED OFF TO 1,838 PSI IN 30 MIN. RETEST FOR LONGER DURATION. FINAL RESULTS: TIME 20:05-1845 PSI TIME 20:20-1827 PSI TIME 20:35-1810 PSI. CONFIRMED WITH TOWN ENGINEER THAT THIS CONSTITUTES A PASSING LINER LAP AND WILL NOT REQUIRE A LTP. THIS CHARTED LINER LAP PT IS FILED IN WELL FILE. SIMULTANEOUS TO THE LINER LAP PRESSURE TEST: REVIEW MCNL DATA(GOOD DATA). SLB UP/DOWN PASSES SHOW GOOD OVERLAY, BUT AFTER CORRECTING TO PDC LOG AT TOP OF PERF INTERVAL ARE OFF DEPTH FROM THE BAKER MWD LOG FROM—11100'DOWN. INVESTIGATE,BELIEVE SLB MCNL DATA TO BE CORRECT. SEND INFO TO TOWN ENGINEER- RECEIVE ORDERS TO SHIFT PERF DEPTHS BY 3' TO SPLIT THE DIFFERENCE. FUNCTION TEST BOPE. PJSM FOR MU PERF GUNS. IAP:80 PSI OAP:0 PSI CONTINUED ON REPORT 07/18/2010 7/18/2010 00:00 - 05:30 5.50 PERFOB P OTHCMP CONTINUED FROM REPORT 07/17/2010 IAP:80 PSI OAP:0 PSI MU AND DEPLOY PERFORATING GUNS. MU CSH AND PERF BHA. 05:30 - 05:50 0.33 PERFOB P OTHCMP RIH W/PERF ASSEMBLY. 05:50 - 08:20 2.50 PERFOB N DFAL OTHCMP LOST ELECTRICAL POWER TO OPS CAB SHUT DOWN PUMPS&STOPPED RIH TROUBLE SHOOT ELECTRICAL POWER SUPPLY TO OPS CAB SLB LINE CONDITIONER FOUND TO BE FAULTY PJSM TO REPAIR ELECTRICAL SUPPLY TO OPSCAB REPAIRED LINE 08:20 - 10:30 2.17 PERFOB P OTHCMP RIH WITH PERF ASSY WT CHECK©11,500'UP WT 44K @ 20 FPM TAG PBTD UNCORRECTED @ 11,583.8'PU& CONFIRM 11,583.8'PBTD RESET DEPTH TO 11,572'IN CORRELATION WITH MCNL LOGS PU TO 11,480' 110:30 - 11:00 0.50 PERFOB P OTHCMP PERF WELL AS PER SLB E-FIRE PROCEDURE FIRED GUNS POH ON DEPTH©11,477' POSITIVE INDICATION OF GUNS FIRING ON SLB SHOT DETECTOR&ALSO BY WT Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 5 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 13:00 2.00 PERFOB P OTHCMP POH WITH PERF ASSY STOP ABOVE TOL&FLOW CHECK WELL"NO FLOW** CONTINUE TO POH PJSM TO STAND BACK CSH WHEN 15 MIN FROM SURFACE — FLOW CHECK WELL©SURFACE NO FLOW" 13:00 - 14:30 1.50 PERFOB P OTHCMP STAND BACK INJECTOR STAND BACK CSH IN DERRICK 14:30 - 15:00 0.50 PERFOB P OTHCMP PJSM TO LD PERF GUNS IN THE PIPE SHED 15:00 - 21:30 6.50 PERFOB P OTHCMP LD PERF GUNS IN THE PIPE SHED. ALL SHOTS FIRED. PERF GUNS ARE 2.0"HSD PJ 2006,6 SPF,60 DEG PHASING,SLB. PERFORATED INTERVALS: 9317'-9437'MD 9537'-9797'MD 10017'-10137'MD 10317'-10527'MD 10637'-10677'MD 10757'-10787'MD 10837'-10877'MD 10927'-11237'MD 11287'-11307'MD 11387'-11477'MD 21:30 - 23:00 1.50 CONDHL P OTHCMP MU NOZZLE. RIH TO 2500'CTMD. CIRCULATE IN 80 DEG F DIESEL FOR FP FROM 2500'CTMD TO SURFACE(DIESEL PUMPED BY LRS). PUMP 50 BBLS DIESEL TOTAL. POOH W/NOZZLE. 23:00 - 00:00 1.00 CONDHL P OTHCMP OOH. CLOSE SWAB,BLOWDOWN STACK. BLOWBACK CT. PJSM FOR GREASE WELLHEAD AND SFT RPV - CONTINUED ON REPORT 07/19/2010 7/19/2010 00:00 - 01:30 1.50 RIGD P OTHCMP CONTINUED FROM REPORT 07/18/2010. GREASE TREE VALVES. SET BPV. 01:30 02:00 0.50 RIGD P OTHCMP UNSTAB CT. 02:00 - 02:25 0.42 RIGD P OTHCMP SECURE CT TO REEL. 02:25 - 02:45 0.33 RIGD P OTHCMP RIG DOWN FARR TONGS AND HOOK UP BOP CABLES. 02:45 - 07:30 4.75 RIGD P PRE PJSM FOR ND LUBRICATOR AND BOPE. ND LUBRICATOR AND BOPE. 07:30 - 08:00 0.50 MOB P PRE PJSM TO MOVE OFF WELL 08:00 - 10:00 2.00 MOB P PRE MOVE OFF WELL 15-32B MOVE RIG TO ENTRANCE OF PAD CLEAR RIGSITE©15-32B&HAVE PERMIT SIGNED OFF BY PAD OPERATOR RELEASED RIG @ 10:00 PJSM TO MOVE RIG TO DS-02 Printed 8/10/2010 11:18:23AM 15-32B, Well History (Post Rig Sidetrack) Date Summary 19-Jul-2010 T/I/O=vac/0/0 Set 4" H CIW BPV#145 thru stack with T-Bar. RKB=28.5 no problems 20-Jul-2010 T/1/O=Vac/0/0 Post CTD Torqued tree to max torque value. Pressure tested Master and Wing valve at a low test of 500 psi for five minutes. Valves passed.Then did a high test of 5000 psi for five minutes. Valves passed. Shut Swab valve did a low test of 500 psi for five minutes. Swab passed.Then did a high test of 5000 psi for five minutes. Swab passed. Pulled 4"CIW BPV#145 thru tree, 1-2'ext used tagged @98". Set 4"CIW TWC#255 thru tree with same equipment.Conducted a shell test of 5000 psi for five minutes from tubing head adapter to swab cap. Tree passed. Pulled 4"CIW TWC#255 thru tree using the same equipment. No problems 20-Jul-2010 ***WELL S/I ON ARRIVAL(post rig)*** SET 4-1/2"WHIDDON CS ON BOT dply SLV @ 8548'SLM PULLED DMY RK-GLV FROM ST#3 @ 5011' SLM/5031' MD, ST#4 @ 3009' SLM/3029' MD. SET LGLV @ ST#4 3009'SLM(3029' MD), O-GLV @ ST#3 5011' SLM(5031' MD). ***WSR CONT ON 7/21/10*** 21-Jul-2010 ***WSR CONT FROM 7/20/10***(g/I for rate) PULLED EMPTY 4 1/2"WHIDDON C-SUB FROM 8548'SLM. RIG DOWN SWCP 11 ***WELL LEFT S/I ON DEPARTURE*** 21-Jul-2010 ASRC Test Unit#1, MIRU, Complete R/U S/B for A/L, ***Job in progress*** 22-Jul-2010 POP post-CTD sidetrack ASRC Test Unit#1, Complete A/L rig up, Divert well through test sep, Open choke monitor solids, Inlet 15. 22-Jul-2010 32,Outlet 15-47, ***Job in progress*** ASRC Test Unit#1,Continue flowback, open choke monitor solids, FOC stabilize well, Start 24 hour test, 23-Jul-2010 Inlet 15-32, Outlet 15-47,***Job in progress*** ASRC Test Unit#1, Complete 24 hour test, Rig down, move unit to L-pad, Inlet 15-32, Outlet 15-47, 24-Jul-2010 ***Job complete*** 3-Aug-2010 WELL S/I ON ARRIVAL*** DRIFT TUBING TO 8553' SLM/8592' MD W/4 1/2" GR, 10'x3.70" DUMMY WHIPSTOCK ***CONT ON 8/4/10 WSR*** 4-Aug-2010 CONT FROM 8/3/10 WSR*** LRS LOADED TBG WITH 160 BBL CRUDE. RAN 3 1/2" BRUSH&2.80" G.RING,TAGGED LNR TOP @ 8553' SLM(8592' MD). SET LTTP INTO DEP SLV @ 8553'SLM (8592' MD). LRS PERFORMED MIT-T TO 2500#. FAILED. PULLED LTTP. SET 4 1/2" BAKER 45 KB LNR TOP PACKER(12'oal)W/HES DPU IN DEP SLV @ 8560' SLM(8592' MD). SET 4 1/2" CAT VALVE IN LTP @ 8553' SLM Page 1 of 2 • 15-32B, Well History (Post Rig Sidetrack) Date Summary LAS MIT-T TUBING TO 2500#(PASS) PULL 4 1/2" CAT VALVE FROM LTP © 8553' SLM ***WELL S/I ON DEPARTURE/DSO NOTIFIED*** 4-Aug-2010 LTP set T/I/O=2550/1420/0(Assist S-Line/Load and Test TBG) Load TBG with 160 bbls dead crude @ 4.2 bpm. Pump dead crude @ 1 bpm while S-Line brushes Pocket. Standby for S-Line to POOH/RIH with UP.Attempt to pressure test plug w/26 bbls crude. Pressured to 1000 psi at 2 bpm shut down and 4-Aug-2010 pressure fell off to 300 psi. FWHP's=300/1420/0 S-line in control of well at LRS dep. T/I/0=350/1420/0 Assist s/line; MITxT to 2500 psi (Determine liner top integrity) ( MITxT Passed on 3rd test) Pump 10.5 bbls 60/40 meth down TBG to achieve test pressure of 2500 Psi. MITxT to 2500 Psi/ TBG lost 40 Psi in 1st 15 Min,then lost 10 Psi in 2nd 15 Mln for a total loss of 50 Psi in 30 Min test. Bled TBG to 400 Psi. Standby for S-Line to POOH. RDMO. S-Line on well © departure. IA and OA open to 4-Aug-2010 gauges. FWHP=350/1420/0 Operator notified. T/I/0=2000/1400/Vac.Temp=91°. Eval cellar conditions(FO call-in).A small amount of fluid in cellar; appears to be drilling fluid, but none found in or on the conductor. Sample taken to lab. Conductor is wet inside(primarily in the 0900 area)w/wet areas on outside,currently evaporating. Cellar gravel is wet in a larger area than is occupied by the apparent drilling fluids.Water level in the reserve pit is 5 or 6 feet 19-Aug-2010 lower than cellar. 20-Aug-2010 Open choke to 45 deg T/I/O=2000/1460/vac.Temp=90*. Install spill containment(Eval fluid in cellar). Small amount of fluid in cellar; appears to be drilling fluid.Could not install liner.Cellar grating exceeds 40 lb lifting max for one 20-Aug-2010 person. T/I/O= 1400/1380/Nac.Temp=Hot. MIT-OA to 500 psi w/N2(Eval fluid in cellar). No AL. Removed 2 yards of gravel from cellar to expose 2 90*circ ports(w/expandible pipe plugs)& 1 45*circ port(w/ 21-Aug-2010 rubber cap). Installed cellar containment.OA FL © 420' (25 bbls).Job postponed. T/I/O= 1400/1380Nac.Temp=Hot.OA FL depress(Eval fluid in cellar). No AL.OA FL © 294'(18 bbls). Utilize SITBGP (from 15-01)to depress OA FL to 768'w/500 psi. No bubbling or LEL's in conductor (LEL's 0%, 02 C4) 20.7%). See log for details. Bled OAP to 0 psi. Final OA FL C© 492' (29 bbls). 22-Aug-2010 FWHP's= 1400/1380/0.Job complete. T/1/O= 1325/1450/0 Load OA for upcoming MIT(Eval Fluid in cellar) Loaded the OA with 30 bbls of crude at 5 BPM.24 bbls into pumping pressure increased to 1100 psi and held there for the remaining 6 bbls. 22-Aug-2010 Final WHP's= 1325/1450/Vac Valve positions at the time of departure: Swab=Closed/Wing, SSV, Master, IA, OA=Open/Tag hung on the OA T/I/O= 1400/1380Nac.Temp= Hot. Remove spill containment(OA FL depress). No AL.OA FL © 228' 23-Aug-2010 (14 bbls). Removed cellar containment. Page 2 of 2 ■a lI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 15 15-32_DIMS - Slot 32 1976' SNL, 333' EWL, SEC 22, T11N, R14E UM 15-32B Survey: MWD Survey Report - Geographic 19 July, 2010 0 by 1 1 Milli BHUGHES Survey Report-Geographic bp INTEQ Company: North America-ALASKA-BP Local Coordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay 'ND Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 15,TR-11-14 7 Site Position: Northing: 5,958,837.36ft Latitude: 70°17'35.236 N From: Map Easting: 676,296.98ft Longitude: 148°34'21.213 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.34 ° Well 15-32 DIMS API No 500292246200 Well Position +N/-S 0.00 ft Northing: 5,959,812.81 ft Latitude: 70°17'44.833 N +E/-W 0.00 ft Easting: 676,277.02 ft Longitude: 148°34'21.128 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 31.00ft Wellbore 15-32B API No 500292246202 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (n f) BGGM2009 7/12/2010 22.17 80.95 57,699 Design 15-32B 1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,050.07 Vertical Section: Depth From(TVD), +N/-S.. +E./-W Direction (ft) (ft) (ft) (°) 39.50 0.00 0.00 351.64 Survey Program Date: 7/19/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 128.00 8,664.38 MWD(15-32PB1) MWD MWD-Standard 8,683.00 9,050.07 MWD(15-32BPB1) MWD MWD-Standard 9,080.14 11,624.00 MWD(15-32B) MWD MWD-Standard — - i 7/19/2010 8:59:15AM Page 2 COMPASS 2003.16 Build 71 • BAKER HUGHES Survey Report-Geographic 0 b 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay ND Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,050.07 85.76 302.91 8,887.26 -9.37 128.99 5,959,806.47 676,406.18 70°17'44.740 N 148°34'17.369 W TIP/KOP 9,080.14 85.49 309.14 8,889.56 8.25 104.75 5,959,823.52 676,381.54 70°17'44.914 N 148°34'18.075 W 9,110.98 86.71 313.32 8,891.65 28.52 81.62 5,959,843.24 676,357.94 70° 17'45.113 N 148°34'18.749 W 9,140.76 88.37 315.77 8,892.93 49.39 60.41 5,959,863.61 676,336.25 70°17'45.318 N 148°34'19.367 W 9,170.73 89.91 320.65 8,893.38 71.73 40.45 5,959,885.47 676,315.77 70°17'45.538 N 148°34'19.949 W 9,203.55 90.31 320.58 8,893.32 97.10 19.63 5,959,910.34 676,294.36 70°17'45.787 N 148°34'20.556 W!, 9,233.45 92.98 318.88 8,892.46 119.90 0.31 5,959,932.68 676,274.52 70°17'46.012 N 148°34'21.119 W I 9,263.94 94.66 316.22 8,890.43 142.34 -20.22 5,959,954.63 676,253.47 70°17'46.232 N 148°34'21.718 W j 9,296.04 93.25 313.46 8,888.22 164.92 -42.93 5,959,976.67 676,230.24 70° 17'46.455 N 148°34'22.379 W' I 9,324.32 93.59 312.17 8,886.53 184.11 -63.63 5,959,995.36 676,209.09 70° 17'46.643 N 148°34'22.983 W 9,350.23 94.20 317.00 8,884.77 202.25 -82.04 5,960,013.07 676,190.26 70°17'46.822 N 148°34'23.520 W 9,380.29 93.32 322.78 8,882.79 225.18 -101.35 5,960,035.54 676,170.42 70°17'47.047 N 148°34'24.083 W 9,409.99 93.04 324.78 8,881.15 249.10 -118.88 5,960,059.04 676,152.34 70°17'47.282 N 148°34'24.593 W 9,440.39 93.87 331.09 8,879.31 274.80 -134.98 5,960,084.36 676,135.64 70°17'47.535 N 148°34'25.063 W 9,470.48 91.96 332.02 8,877.78 301.22 -149.29 5,960,110.43 676,120.71 70°17'47.795 N 148°34'25.480 W 9,499.10 88.86 334.75 8,877.58 326.80 -162.11 5,960,135.71 676,107.30 70°17'48.047 N 148°34'25.853 W 9,530.46 87.05 339.05 8,878.70 355.62 -174.40 5,960,164.23 676,094.34 70°17'48.330 N 148°34'26.212 W 9,560.47 87.48 340.85 8,880.13 383.78 -184.68 5,960,192.13 676,083.40 70°17'48.607 N 148°34'26.511 W 9,592.05 90.64 338.40 8,880.65 413.37 -195.67 5,960,221.46 676,071.72 70°17'48.898 N 148°34'26.832 W 9,624.27 92.33 335.53 8,879.81 443.01 -208.27 5,960,250.79 676,058.43 70°17'49.190 N 148°34'27.199 W 9,657.68 93.62 332.73 8,878.08 473.03 -222.83 5,960,280.46 676,043.17 70°17'49.485 N 148°34'27.623 W 9,687.66 91.90 330.03 8,876.63 499.31 -237.17 5,960,306.39 676,028.22 70°17'49.743 N 148°34'28.042 W 9,717.40 92.98 326.58 8,875.37 524.59 -252.78 5,960,331.30 676,012.02 70°17'49.992 N 148°34'28.496 W 9,755.29 92.39 327.32 8,873.59 556.31 -273.42 5,960,362.53 675,990.65 70°17'50.304 N 148°34'29.098 W 9,789.95 90.77 331.38 8,872.64 586.11 -291.08 5,960,391.90 675,972.30 70°17'50.597 N 148°34'29.613 W 9,815.61 92.76 335.46 8,871.85 609.04 -302.55 5,960,414.56 675,960.29 70°17'50.822 N 148°34'29.947 W 9,846.12 93.57 338.47 8,870.16 637.08 -314.47 5,960,442.30 675,947.72 70°17'51.098 N 148°34'30.295 W 9,878.92 92.34 343.10 8,868.47 668.00 -325.25 5,960,472.96 675,936.22 70°17'51.402 N 148°34'30.609 W 9,906.24 90.18 342.70 8,867.87 694.10 -333.28 5,960,498.86 675,927.58 70°17'51.659 N 148°34'30.843 W' 9,936.08 91.66 346.31 8,867.39 722.85 -341.25 5,960,527.41 675,918.94 70°17'51.942 N 148°34'31.076 W I 9,967.11 94.03 349.45 8,865.85 753.14 -347.75 5,960,557.55 675,911.72 70°17'52.240 N 148°34'31.265 W 9,995.81 94.30 353.41 8,863.76 781.44 -352.02 5,960,585.74 675,906.79 70°17'52.518 N 148°34'31.390 W 10,027.67 92.83 354.32 8,861.78 813.06 -355.42 5,960,617.26 675,902.66 70°17'52.829 N 148°34'31.489 W 10,055.80 95.19 359.35 8,859.81 841.06 -356.97 5,960,645.22 675,900.45 70°17'53.104 N 148°34'31.534 W 10,085.88 95.47 3.34 8,857.02 871.00 -356.26 5,960,675.16 675,900.45 70°17'53.399 N 148°34'31.513 W 10,114.48 92.36 4.99 8,855.07 899.45 -354.19 5,960,703.66 675,901.85 70°17'53.679 N 148°34'31.453 W 10,144.81 93.44 9.74 8,853.53 929.49 -350.31 5,960,733.77 675,905.03 70°17'53.974 N 148°34'31.340 W 10,168.43 94.08 11.98 8,851.98 952.63 -345.87 5,960,757.01 675,908.93 70°17'54.202 N 148°34'31.211 W 10,202.49 92.46 6.14 8,850.04 986.20 -340.52 5,960,790.69 675,913.49 70°17'54.532 N 148°34'31.055 W 10,232.41 95.05 8.47 8,848.08 1,015.80 -336.72 5,960,820.38 675,916.59 70°17'54.823 N 148°34'30.944 W 10,263.42 96.36 9.96 8,845.00 1,046.26 -331.78 5,960,850.94 675,920.81 70°17'55.122 N 148°34'30.800 W 10,290.76 95.35 4.14 8,842.20 1,073.24 -328.45 5,960,877.99 675,923.51 70° 17'55.388 N 148°34'30.703 W 10,325.70 95.82 1.64 8,838.80 1,107.97 -326.69 5,960,912.74 675,924.45 70°17'55.729 N 148°34'30.652 W 10,350.31 96.82 1.32 8,836.09 1,132.42 -326.06 5,960,937.20 675,924.51 70°17'55.970 N 148°34'30.633 W I 10,383.79 96.46 357.81 8,832.22 1,165.67 -326.32 5,960,970.43 675,923.48 70° 17'56.297 N 148°34'30.641 W 10,410.77 93.50 357.33 8,829.88 1,192.52 -327.45 5,960,997.25 675,921.71 70°17'56.561 N 148°34'30.674 W 10,441.43 90.65 357.88 8,828.77 1,223.13 -328.73 5,961,027.82 675,919.71 70° 17'56.862 N 148°34'30.711 W 10,493.58 88.62 0.89 8,829.10 1,275.27 -329.29 5,961,079.93 675,917.93 70° 17'57.375 N 148°34'30.728 W 10,524.34 88.04 5.49 8,830.00 1,305.96 -327.58 5,961,110.65 675,918.92 70° 17'57.677 N 148°34'30.678 W 10,561.01 87.18 10.45 8,831.53 1,342.23 -322.51 5,961,147.03 675,923.14 70° 17'58.033 N 148°34'30.530 W 10,588.87 87.48 13.90 8,832.83 1,369.43 -316.64 5,961,174.35 675,928.37 70° 17'58.301 N 148°34'30.359 W'I 10,619.77 87.17 13.13 8,834.27 1,399.44 -309.42 5,961,204.52 675,934.88 70° 17'58.596 N 148°34'30.149 W 10,647.74 89.51 8.73 8,835.08 1,426.88 -304.13 5,961,232.08 675,939.53 70°17'58.866 N 148°34'29.994 W', 10,681.96 90.86 3.32 8,834.97 1,460.90 -300.54 5,961,266.17 675,942.32 70° 17'59.200 N 148°34'29.890 W 7/19/2010 8:59:15AM Page 3 COMPASS 2003.16 Build 71 . • Mill BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) C) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,709.18 90.37 3.43 8,834.68 1,488.07 -298.93 5,961,293.37 675,943.29 70°17'59.468 N 148°34'29.843 W' 10,745.59 93.01 0.48 8,833.60 1,524.44 -297.69 5,961,329.75 675,943.68 70°17'59.825 N 148°34'29.807 W 10,775.81 93.04 357.91 8,832.01 1,554.61 -298.11 5,961,359.91 675,942.55 70°18'0.122 N 148°34'29.819 W 10,804.81 93.25 354.96 8,830.42 1,583.51 -299.92 5,961,388.75 675,940.07 70° 18'0.406 N 148°34'29.872 W' 10,833.13 92.73 352.02 8,828.94 1,611.60 -303.12 5,961,416.76 675,936.20 70°18'0.683 N 148°34'29.965 W 10,860.50 92.39 348.79 8,827.72 1,638.56 -307.68 5,961,443.60 675,931.02 70°18'0.948 N 148°34'30.098 W I 10,890.82 93.77 345.14 8,826.09 1,668.05 -314.51 5,961,472.92 675,923.50 70°18'1.238 N 148°34'30.297 W 10,929.86 91.50 340.64 8,824.29 1,705.31 -325.98 5,961,509.90 675,911.16 70°18'1.604 N 148°34'30.632 W I 10,954.21 92.36 337.34 8,823.47 1,728.03 -334.70 5,961,532.40 675,901.91 70°18'1.828 N 148°34'30.886 W! i 10,980.95 92.00 339.24 8,822.45 1,752.85 -344.58 5,961,556.99 675,891.44 70°18'2.072 N 148°34'31.174 W 11,012.11 89.85 341.97 8,821.95 1,782.23 -354.93 5,961,586.12 675,880.41 70°18'2.361 N 148°34'31.476 W 11,045.80 88.49 347.25 8,822.44 1,814.70 -363.87 5,961,618.36 675,870.72 70°18'2.680 N 148°34'31.736 W 11,080.56 88.90 350.32 8,823.23 1,848.78 -370.62 5,961,652.28 675,863.16 70°18'3.015 N 148°34'31.933 W 1 11,108.82 89.23 354.04 8,823.69 1,876.77 -374.47 5,961,680.17 675,858.66 70°18'3.290 N 148°34'32.046 W 11,133.10 89.97 357.38 8,823.86 1,900.98 -376.28 5,961,704.32 675,856.28 70°18'3.528 N 148°34'32.099 W 11,165.33 90.92 1.22 8,823.61 1,933.20 -376.68 5,961,736.52 675,855.13 70° 18'3.845 N 148°34'32.110 W 11,193.47 91.38 4.62 8,823.05 1,961.29 -375.24 5,961,764.64 675,855.91 70°18'4.122 N 148°34'32.068 W' 11,223.99 91.78 9.68 8,822.20 1,991.55 -371.45 5,961,794.98 675,858.99 70°18'4.419 N 148°34'31.958 W i 11,266.84 90.61 10.32 8,821.31 2,033.74 -364.01 5,961,837.33 675,865.44 70°18'4.834 N 148°34'31.741 W 11,290.18 89.63 5.39 8,821.26 2,056.86 -360.82 5,961,860.51 675,868.08 70°18'5.062 N 148°34'31.648 W 11,317.14 92.74 0.84 8,820.70 2,083.76 -359.36 5,961,887.44 675,868.92 70°18'5.326 N 148°34'31.605 W 11,348.69 92.88 357.35 8,819.16 2,115.26 -359.85 5,961,918.92 675,867.68 70°18'5.636 N 148°34'31.620 W I 11,362.93 91.57 354.72 8,818.60 2,129.46 -360.84 5,961,933.09 675,866.36 70°18'5.776 N 148°34'31.649 W I 11,407.07 89.94 349.10 8,818.02 2,173.14 -367.05 5,961,976.60 675,859.13 70° 18'6.205 N 148°34'31.830 W 11,439.91 89.14 353.64 8,818.29 2,205.59 -371.97 5,962,008.93 675,853.45 70°18'6.524 N 148°34'31.973 WI 11,474.26 89.20 357.74 8,818.78 2,239.84 -374.55 5,962,043.10 675,850.06 70°18'6.861 N 148°34'32.049 W', 11,506.26 91.38 4.89 8,818.62 2,271.80 -373.82 5,962,075.08 675,850.05 70°18'7.176 N 148°34'32.027 W 11,532.92 91.78 8.30 8,817.89 2,298.27 -370.76 5,962,101.61 675,852.49 70°18'7.436 N 148°34'31.938 W' 11,560.27 91.75 12.01 8,817.04 2,325.18 -365.94 5,962,128.62 675,856.67 70°18'7.700 N 148°34'31.798 W 11,577.31 91.29 14.04 8,816.59 2,341.77 -362.10 5,962,145.30 675,860.12 70°18'7.864 N 148°34'31.686 W 11,624.00 91.29 14.04 8,815.54 2,387.06 -350.78 5,962,190.83 675,870.38 70° 18'8.309 N 148°34'31.356 W TD-2-7/8" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,624.00 8,815.54 2-7/8" 2.875 4.125 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 9,050.07 8,887.26 -9.37 128.99 TIP/KOP 11,624.00 8,815.54 2,387.06 -350.78 TD Checked By: Approved By: Date: 7/19/2010 8:59:15AM Page 4 COMPASS 2003.16 Build 71 •i STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑ Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 7/19/2010 210-062 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/6/2010 50-029-22462-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 7/15/2010 PBU 15-32B 1676'FNL, 333'FWL, SEC.22,T11N, R14E, UM 8. KB(ft above MSL): 70.05' 15.Field/Pool(s): Top of Productive Horizon: 1709'FNL,497'FWL,SEC.22,T11N, R14E, UM GL(ft above MSL): 33.3' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 711'FSL, 13'FEL,SEC. 16,T11N, R14E, UM 11584' 8816' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 676277 y- 5959812 Zone- ASP4 11624' 8816' ADL 028306 TPI: x- 676442 y- 5959783 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 675870 Y- 5962191 Zone- ASP4 None None 18.Directional Survey: Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, MCNL/GR/CCL 8687' 8643' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 34' 114' 34' 114' 30" -260 sx Arctic Set 13-3/8" 68# L-80 35' 3530' 35' 3529' 16" 1170 sx Permafrost'E'. 375 sx Class'G' 9-5/8" 47# L-80 32' 8327' 32' , 8319' 12-1/4" 610 sx Class'G' 7" 26# L-80/13Cr 8165' 8687' 8161' xxx' 8-1/2" 280 sx Class'G' 3-1/2"x 3/3-18" 9.3#/6.2# L-80 8592' 11624' 4-1/8" 165 sx Class'G' r/ x 2-7/8" /6.5# 24. Open to production or injection? ® Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 spf 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80 8621' 8092'/8089'• MD ND MD ND 9317'-9437' 8887'-8880' 10757'-10787' 8833'-8831' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 9537'-9797' 8879'-8873' 10837'-10877' 8829'-8827' 10017'-10137' 8862'-8854' 10927'-11237' 8824'-8822' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 10317'-10527' 8840'-8830' 11287'-11307' 8821'-8821' 2500' Freeze Protected w/50 Bbls of Diesel 10637'-10677' 8835'-8835' 11387'-11477' 8818'-8819' 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): July 22,2010 _ Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 8/10/2010 6 Test Period ♦ 267 3,867 -0- 25 14,463 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 1,056 1,400 24-Hour Rate ♦ 1,069 15,468 -0- Not Available 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,cor .; • phs and laborat "NM 0 AAC 250.071. None hi, teY MIN ,, ,- Au G 1 g 2010 S AUG 2 01010 :-,.!3PA Aloskn eri&C Commission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE i_.., 8~ "�1Sy.b it Original Only 6° 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑Yes IS No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. 23SB/Zone 2B 8710' 8662' None 22TS 8773' 8720' 21 TS/Zone 2A 8842' 8778' Zone 1B 8904' 8821' TDF/Zone 1A 9006' 8877' Formation at Total Depth(Name): TDF/Zone 1A 9006' 8877' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra 'tewman �.`!;`_I Title: Drilling Technologist Date:' 0^ PBU 15-32B 210-062 Prepared By Name/Number. Tenie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Sean McLaughlin,564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4-1/16"CIW SAFI ROTES: WELL ANGLE>70°@ 9015' WELLHEAD= FMC ACTUATOR= BAKER C PJC D F T 1 5-3 2 ***4-1/2"CRHOME TBG&7" LNR*** KB.ELEV= 70.5' A BF. ELEV= NA KOP= 8149' Max Angle= 97°@ 10350' 2008' H4-1/2"X NIP, ID=3.813" I Datum MD= 8989' Datum TVD= 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 20"CONDUCTOR,91.5#,H-40, 19.124—I 114' 4 3029 3028 1 MMG DOME RK 16 07/20/10 3 5031 5029 1 MMG SO RK 20 07/20/10 13-3/8"CSG,68#, L-80,ID=12.415" --I 3530' I 2 6861 6859 0 MMG DMY RK 0 04/11/08 1 ,7981 7979 5 MMG DMY RK 0 04/11/08 Minimum ID = 2.387" @ 8754' 8062' I-14-1/2"X NIP, ID=3.813" I 3-3/16" X 2-7/8" CROSSOVER M ∎M 8092' H 9-5/8"X 4-1/2"BKR S-3 PKR, ID=3.875" I M 8127' H4-1/2"X NIP, ID=3.813"1 TOP OF 7"LNR —I 8165' I- ® 8165' H 9-5/8"X 7"TIEBACK SLV I 1 8173' H 9-5/8"X 7"TIW LW w/LNR HGR,ID=6.276" I 9-5/8"CSG,47#, L-80 NSCC, ID=8.681" —I 8327' I--4 8592' I-13-1/2"DEPLOY SLEEVE,ID=3.000" J TOP OF 2-7/8"LNR —1 8592' i D 8604' -J 3-1/2"PUP JT, ID=2.992" i, I 8614' J-13-1/2"OTIS X NIP,ID=2.812" I 4-1/2"TBG, 12.6#, 13CR-80 VAM TOP, —I 8621' •��j ��� 8621' —14-1/2"WLEG,ID=3.958" I .0152 bpf,ID=3.958" ����� ����� . ♦♦ ��� 3-1/2"LNR,9.3#,L-80 STL, .0087 bpf, ID=2.992" —I 8657' ■3�.4 .�• —I re: .V: 8657' —13-1/2"XO TO 3-3/16", ID=2.786" I 7"LNR,26#,L-80 NSCC XO TO 13CR NSCC 8665' C*:*: W,,,; 7"LNR,26#,13CR NSCC, .0383 bpf, ID=6.276" —I 8689' I e% �w%i 4■4 t MILLOUT WINDOW(15-32B) 8690'-8695' 7"GEN II WHIPSTOCK(07/04/10) H 8689' .N,�. PERFORATION SUMMARY REF LOG:BHI MWD/GR ON 11/04/01 ANGLE AT TOP PERF:96°@ 9317' Note:Refer to Production DB for historical pert data ��, I 8754' I—3-3/16"XO TO 2-7/8",moms ■SIZE SPF INTERVAL Opn/Sqz DATE iii !i ID=2.387" 2" 6 9317-9437 0 07/18/10 174 7!7 4 2" 6 9537-9797 0 07/18/10 ` 2" 6 10017- 10137 0 07/18/10 ` 2" 6 10317- 10527 0 07/18/10 ` 2" 6 10637- 10677 0 07/18/10 2" 6 10757- 10787 0 07/18/10 3-3/16"LNR,6.2#,L-80 TCII, H 8754' I � 2" 6 10837- 10877 0 07/18/10 % 2" 6 10927- 11237 0 07/18/10 .0076 bpf,ID=2.80" 2" 6 11287- 11307 0 07/18/10 ` PBTD 11584' 2" 6 11387- 11477 0 07/18/10 2-7/8"LNR,6.5#,L-80 STL, .0058 bpf, ID=2.441" H 11624' I •Si, DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/28/94 D9 ORIGINAL COMPLETION 07/27/10 PJC DRAWING CORRECTIONS WELL: 15-32B : 11/08/01 NORDIC 1 CTD SIDETRACK(15-32A) 07/28/10 MK/PJC MIN ID CORRECTIONS PERMIT No:'2100620 l 04/11/08 D16 RWO _ API No: 50-029-22462-02 07/18/10 NORDIC 2 CTD SIDETRACK(15-32B) SEC 22,T11 N,R14E, 1676'FNL&333'FWL 07/26/10 PJC DRLG DRAFT CORRECTIONS 07/26/10 DAV/PJC GLV C/O(07/20/10) BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 1 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:MOBILIZATION(MOB) Start Date:7/3/2010 End Date:7/4/2010 X3-00W02-C(547,512.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/3/2010 08:00 - 14:00 6.00 MOB P PRE SET THE RIG DOWN AFTER BACKING OFF WELL TO REPLACE HARDLINE ON PUMP#1 14:00 - 14:15 0.25 MOB P PRE PJSM TO MOVE RIG OVER TO 15-32B 14:15 - 15:00 0.75 MOB P PRE MOVE RIG TO 15-32B 15:00 - 15:30 0.50 MOB P PRE PJSM TO SPOT RIG OVER 15-32B 15:30 - 16:30 1.00 MOB P PRE SPOT RIG OVER WELL 15-32B RIG ACCEPTED @ 15:30 16:30 - 18:00 1.50 MOB P PRE REMOVE TREE CAP&NU BOPE ONTO WELL HEAD 18:00 - 19:45 1.75 MOB P PRE LEVEL RIG 19:45 - 20:00 0.25 MOB P PRE PJSM TO FINISH NU OF BOPE 20:00 - 22:15 2.25 BOPSUR P PRE FINISH NU BOPE 22:15 - 22:30 0.25 BOPSUR P PRE PJSM TO PT BOPE 122:30 - 00:00 1.50 BOPSUR P PRE PT BOPE AS PER NORDIC PROCEDURE&AOGCC REGULATIONS / 7/4/2010 00:00 - 06:00 6.00 P PRE PT BOPE f ,S r 06:00 - 06:20 0.33 BOPSUR P PRE CREW CHANGE&PJSM TO CONTINUE BOP TEST 1G 06:20 - 08:15 1.92 BOPSUR P PRE CONTINUE BOP TFST , 111 /J 08:15 - 08:30 0.25 BOPSUR P PRE PJSM TO PU INJECTOR TO PT PACKOFF AND INNER REEL VALVE — 08:30 - 09:00 0.50 BOPSUR P PRE PT PACKOFF&INNER REEL VALVE I 09:00 - 09:30 0.50 BOPSUR P PRE PUMP SLACK MANAGEMENT 09:30 - 09:45 0.25 BOPSUR P PRE PJSM TO CUT PIPE TO LOOK FOR WIRE 09:45 - 10:20 0.58 BOPSUR P PRE CUT PIPE TO FIND WIRE 10:20 - 10:55 0.58 BOPSUR P PRE PREP TO MU SLB CTC 1 10:55 - 11:10 0.25 BOPSUR P PRE PULL TEST CTC TO 42K 11:10 - 11:20 0.17 BOPSUR P PRE MOVE INJECTOR OVER BUNG HOLE TO PUMP SLACK FORWARD 11:20 - 11:30 0.17 BOPSUR P PRE MEG TEST WIRE 11:30 - 12:00 0.50 BOPSUR N SFAL PRE WIRE NOT TESTING,SUSPECT PIG TAIL FROM REEL TO NEW SHACK IS THE PROBLEM.BHI INVESTIGATING 12:00 - 12:30 0.50 BOPSUR N SFAL PRE FOUND BAD CONNECTION,MU UQC AND TERMINATE WIRE IN FLOW SUB Printed 8/10/2010 1 1:17:06AM North America-ALASKA-BP Page 1 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 I End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 I Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (ft) 7/4/2010 12:30 - 12:50 0.33 STWHIP P WEXIT PJSM TO PT BHI UCQ&FLOW SUB AND MU WINDOW MILLING BHA 12:50 - 13:15 0.42 STWHIP P WEXIT PT BHI TOOLS 13:15 - 13:40 0.42 STWHIP P WEXIT MOVE INJECTOR OVER BUNG HOLE TO PUMP SLACK FORWARD WHILE MAKING UP WINDOW BHA 13:40 - 14:00 0.33 STWHIP P WEXIT SLACKED PUMPED FORWARD AND BHA IS MADE UP,SHUT DOWN PUMP TO PU INJECTOR AND MAKE UP TO BHA 14:00 - 15:40 1.67 STWHIP P WEXIT RIH WITH WINDOW BHA AT MIN RATE TO 2500' THE INCREASE RATE TO DISPLACE FP FROM WELL 15:40 - 15:45 0.08 STWHIP P WEXIT STOP AND FLOW CHECK WELL FOR GAS,NO FLOW 15:45 - 16:10 0.42 STWHIP P WEXIT TIE IN FROM 8450' 16:10 - 16:15 0.08 STWHIP P WEXIT CORRECT DEPTH-3'AND RIH WT CK AT 8600'=40K 16:15 - 16:30 0.25 STWHIP P WEXIT TAG WS AT 8688.5'PU 10'AND BRING PUMP ONLINE AT 2.5 BPM SWAP TO GEOVIS 16:30 - 16:40 0.17 STWHIP P WEXIT START TIME MILLING FIRST 1'@ 1 FPH 16:40 - 17:30 0.83 STWHIP N DFAL WEXIT PU OFF BOTTOM,MWD NOT WORKING NO COMMS TO MWD AND WO A FUNCTIONING DISCONNECT WE NEED TO POOH SLB MECHANIC HERE TO LISTEN TO INJECTOR BECAUSE THERE WAS A LITTLE CHATTER WHILE WE WERE RIH 17:30 - 19:15 1.75 STWHIP N DFAL WEXIT POOH FROM 8400' PJSM WITH CREW TO LD MILLING BHA WHEN 15 MINUTES FROM SURFACE 19:15 - 20:15 1.00 STWHIP N DFAL WEXIT LD BHA&TROUBLESHOOT MWD TOOLS SWAP OUT MWD TOOLS 20:15 - 22:30 2.25 STWHIP N DFAL WEXIT RIH WITH NEW TOOLS TO 8,450' LOG TIE IN FROM 8,450'TO 8,490' -4'CORRECTION UP WT 37K CONTINUE TO RIH&TAG TOWS @ 8,690' _ '22:30-- 00:00 1.50 STWHIP P WEXIT MILL WINDOW PU TO 8,680' BRING PUMPS UP TO RATE FS 2,850 PSI @ 2.5 BPM RIH&TAG TOWS WITH PUMPS ON @ 8,689.3' 1 TIME MILL THE FIRST 1'@ 1 FPH&50-100 PSI MTR WK,.5K-1.5K WOB Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 2 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5©70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/5/2010 00:00 - 06:15 6.25 STWHIP P WEXIT CONTINUE MILLING WINDOW FROM 8,690.3' FS 2,850 PSI @ 2.5 BPM ADJUST MILLING AS PER NEW LARGE DIAMOND WINDOW MILL PROCEDURE 00:05=8,690.7',3,080 PSI,3.1K WOB 00:30=8,691.3',3,058 PSI,3.9K WOB 01:10=8,692',3,098 PSI,4.7K WOB 01:45=8,692.3',3,040 PSI,4.3K WOB 02:20=8,692.6',3,000 PSI,3.6K WOB 03:00=8,693.3',3,000 PSI,4K WOB 03:30=8,693.7,2,940 PSI,3.4K WOB 04:00=8,694.3,2,941 PSI,4K WOB 04:30=8,694.5',2,940 PSI,3.8K WOB 05:00=8,694.8',2,980 PSI,3.9K WOB 05:30=8,695.2',3,000 PSI,3.7K WOB 06:00=8695.6',2974 PSI,MWD SHACK POWER OUTAGE 06:15 - 07:50 1.58 STWHIP P WEXIT MWD SHACK POWER BACK ON PU TO ZERO WOB FS=2780 PSI,FIRST MOTOR WORK AT 8694.6' 06:30=8695.6',2922 PSI,3.0k WOB 07:00=8696.0',3080 PSI,3.7k WOB 07:30=8696.4,3150 PSI,3.8k WOB 07:50 - 11:30 3.67 STWHIP P- WEXIT 8696.7'CT PRESSURE RAMPED UP TO 3310 PSI &WOB INCREASED 400#LOOKS LIKE WE ARE MILLING FORMATION,BHI HAND THINKS WE EXITED ABOUT 8695.8' FS 2780 PSI 2.5 BPM IN/OUT BHP/ECD/TVD:4473 PSI/10.13 PPG/8592' IAP/OAP/PVT:171 PSI/0 PSI/344 BBLS 08:00=8696.7',3215 PSI,3.4K WOB 08:30=8698.2',3197 PSI,4.2K WOB 09:00=8699.5',3157 PSI,4.3K WOB 09:30=8702.0',3222 PSI,4.1K WOB 10:00=8703.7,3193 PSI,4.4k WOB 10:30=8704.7,3153 PSI,4.1k WOB 11:00=8705.6,3190 PSI,5.3k WOB 11:30 - 12:05 0.58 STWHIP P WEXIT MILLED 10'OF OH TO 8706' DRESS WINDOW REAMING UP AND DOWN 3 PASSES @ 1FPM 2772 PSI @ 2.5 BPM IN&OUT IA/OA/PVT=188 PSI/0 PSI/346 BBLS 12:05 - 12:30 0.42 STWHIP N WEXIT BHI GENERATOR SHUT DOWN AGAIN,KEEP COMING UP UNTIL WE HAVE COMMS TO TOOL FOR DRY DRIFT 12:30 - 12:55 0.42 STWHIP N WEXIT DRY DRIFT WINDOW CLEAN AND TAGGED AT 8706'.BHI GENERATOR DIED AGAIN WHEN WE WERE BELOW THE WINDOW,TRUCK TO MOVE SAT CAMP IS ON THE WAY AND WE WILL PROBABLY SWAP BHI BACK TO SAT CAMP BEFORE DRILLING BECAUSE OF POWER ISSUES 12:55 - 13:00 0.08 STWHIP P WEXIT OPEN EDC AND CIRCULATE OOH 13:00 - 13:15 0.25 STWHIP N WEXIT RIG LOST POWER Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 3 of 14 Operation Summary Report Common Well Name:15-32_DIMS 'AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:15 - 14:20 1.08 STWHIP P WEXIT POOH 14:20 - 14:40 0.33 STWHIP P WEXIT PJSM TO LD WINDOW BHA AND MU BUILD BHA 14:40 - 15:35 0.92 STWHIP P WEXIT OOH CLOSE EDC AND CHECK FOR FLOW NO FLOW,LD WINDOW BHA WINDOW&STRING MILL BOTH GAUGED 3.80 GO 3.79 NO-GO AND NOT MUCH WEAR ON FACE OF MILL 15:35 - 15:50 0.25 DRILL P PROD1 PJSM TO PU BUILD BHA 15:50 - 16:35 0.75 DRILL P ■ PROD1 PU BHA TEST TOOL 16:35 - 17:10 0.58 DRILL P PROD1 RIH 2'AND TAGGED 17:10 - 17:25 0.25 DRILL N SFAL PROD1 CAN'T GET DOWN TAGGING 2'FROM TAG UP, PJSM TO PU INJECTOR AND INSPECT BHA 17:25 - 17:45 0.33 DRILL N SFAL PROD1 PU INJECTOR AND TRY WIGGLING PAST.NO GO,BO MWD AND LOOK AT BHA 17:45 - 19:20 1.58 DRILL N SFAL PROD1 PU INJECTOR TO SEE IF INJECTOR WILL RIH PROBLEM IS THE INJECTOR.LOWER INJECTOR TO TROUBLE SHOOT PROBLEM.REMOVED LUBRICATOR FROM BOTTOM OF INJECTOR FOR CLOSER INSPECTION INJECTOR BALLED UP WITH STEEL SHAVINGS WHICH GOUGED BOTTOM 15'OF COIL. 19:20 - 19:35 0.25 DRILL N SFAL PROD1 PJSM TO PU BHA&STAND BACK IN THE DERRICK 7 CUT GOUGED COIL 19:35 - 19:55 0.33 DRILL N SFAL PROD1 STAND BHA BACK IN DERRICK 19:55 - 21:30 1.58 DRILL N SEAL PROD1 CUT 23.75 OF GOUGED COIL FROM REEL INSTALL SLB CTC REINSTALLED LUBRICATOR 21:30 - 21:55 0.42 DRILL N SFAL PROD1 RE-HEAD COIL WITH BHI UQC PULL&PRESSURE TEST UQC TEST GOOD 21:55 - 22:10 0.25 DRILL N SFAL _ PROD1 PJSM TO PU BHA&LOWER IN HOLE STAB ON INJECTOR 22:10 - 22:25 0.25 DRILL N SFAL _ PROD1 PU BHA&LOWER IN HOLE STAB ON INJECTOR 22:25 - 22:30 0.08 DRILL N SFAL PROD1 PJSM WITH NORDIC&SLB DRILLER FOR TIH 22:30 - 00:00 1.50 DRILL P ■ PROD1 TEST BHI TOOLS @ SURFACE RIH WITH BUILD ASSY 7/6/2010 00:00 - 00:30 0.50 DRILL P ■ PROD1 RIH WITH BUILD BHA TO 8,450' FLOW CHECK WELL 00:30 - 05:50 5.33 DRILL C PROW SWAP BHI EQUIPMENT&COMPUTERS FROM BHI TRAILER BACK INTO SATTELITE CAMP DUE TO INTERMITTENT POWER SUPPLY IN TRAILER TO ENSURE UNINHIBITED COMMUNICATION WITH DOWNHOLE TOOLS 05:50 - 06:15 0.42 DRILL P PROD1 LOG TIE WITH-2'CORRECTION CONTINUE TO RIH THRU WINDOW TAG BOTTOM @ 8,701' PU&BRING PUMPS ONLINE Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 4 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) _— Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (ft) 06:15 - 07:30 1.25 DRILL P PROD1 DRILL BUILD FRQM.S 701' FS 2,850 PSI @ 2.5 BPM STALL @ 8,715' 06:45=8,716',100 PSI MTR WK,1.4K WOB, 10.11 ECD 07:30 - 08:35 1.08 DRILL P PROD1 DRILLED TO 8728'AND THE DD LOST HIS MWD SCREEN.PU ABOVE WINDOW WHILE BHI FIGURES OUT PROBLEM 08:35 - 10:00 1.42 DRILL P PROD1 CONTINUE DRILLING 10:00 - 12:30 2.50 DRILL P PROD1 DRILLING AHEAD 3190 PSI DHWOB 1.2K TO 2.0K 2.5 BPM IN&OUT IA/OA/PVT=138 PSI/0 PSI/341 BBLS DRILL TO 8850' 12:30 - 14:00 1.50 DRILL P PROD1 LOG MOTHER BORE/RA TIE IN. RA TAG AT 8693'. TOP WS AT 8683'. TOP OF WINDOW:8687' BOT OF WINDOW:8693.5' 114:00 - 17:15 3.25 DRILL P PROD1 DRILL AHEAD FROM 8850'. 2830 PSI FS AT 2.47 BPM IN/OUT.200-300 PSI MTR WORK. 2.5-3.0K#DHWOB. RATTY DRILLING. AVG 40 DEG DOG LEG. ±17:15 - 19:30 2.25 DRILL N DPRB PROD1 DGS AND NEAR BIT INCLINATION BOTH SUDDENLY JUMPED BY 2 DEG. NOT SURE WHY. SUSPECT A TOOL PROBLEM,ALTHOUGH ALL OTHER PARAMETERS APPEAR NORMAL. DECIDE TO PULL TOOL DUE TO INC UNCERTAINTY IN CRITICAL PART OF THE BUILD SECTION. FAULTY WIRE CONNECTION @ SURFACE FOUND TO BE THE CAUSE 19:30 - 22:15 2.75 DRILL N DPRB PROD1 PU TO 8,715'&LOG TIE IN NO CORRECTION NEEDED RIH TO 8,944' RE-LOG SURVEYS TO INSURE ACCURACY FOR MISSING SECTION RIH TO TD 22:15 - 23 50 1.58 DRILL P PROD1 DRILL BUILD FROM 8,981' FS 2,980 PSI @ 2.6 BPM 22:30=9,003',500 PSI MTR WK,1.6K WOB, 10.17 ECD STALL @ 9,010',9,022' 23:00=9,023',400 PSI MTR WK,2.7K WOB, 10.18 ECD 23:35=9,054',410 PSI MTR WK,2.5k WOB, 10.19 ECD TD BUILD @ 9,065' PJSM WITH SLB&NORDIC DRILLERS ROR POH 23:50 - 00:00 0.17 DRILL P PROD1 POH 4K OVERPULL WHEN COMING THROUGH TUBING TAIL Printed 8/10/2010 11:17:39AM North America-ALASKA- BP Page 5 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/7/2010 00:00 - 02:00 2.00 DRILL P PROD1 POH FOR LATERAL ASSY PJSM TO SWAP BUILD BHA FOR LATERAL BHA 15 MINUTES FROM SURFACE _ FLOW CHECK WELL @ SURFACE-NO FLOW 02:00 - 03:30 1.50 DRILL P PROD1 POP OFF INJECTOR ADJUST MOTOR ANGLE FROM 3.6 DEG TO 1.2 DEG PU HYC RZR EDGE BIT 03:30 05:45 2.25 DRILL P PROD1 CHECK EQUIPMENT @ SURFACE RIH WITH LATERAL BHA LOG TIE IN-4'CORRECTION WORK THROUGH SHALE 8,984' TAG TD @ 9,066' 05:45 - 09:00 3.25 DRILL P PROD1 DRILL AHEAD FROM 9,066' FS 3,050 PSI @ 2.5 BPM IN/OUT. 300-350 PSI MTR WORK. DHWOB:0.5-1.0 K#. BHP/ECD/TVD:4653 PSI/10.17 PPG/8816' IA/OA/PVT:250 PSI/0/373 BBLS. FREQUENT STALLS WITH HIGH ROP IN BETWEEN. RUN LIGHT WOB TO REDUCE STALLLING. DRILL TO 9165'. 09:00 - 13:45 4.75 DRILL P PROD1 DRILL AHEAD FROM 9165'.. BEGIN MUD CHANGE. DISCUSS MANAGING FLUID VOLUMES WHILE MONITORING WELL RETURNS. HAVING SUBSTANTIAL PROBLEMS KEEPING THE BIT &MOTOR FROM STALLING. BIT GRABBING ON BTM,EVEN WITH NEW MUD AROUND. • FOUND SOME MOTOR RUBBER IN RETURNS. 13:45 - 16:00 2.25 DRILL N DFAL 9,221.0 PROD1 ONCE FLUID VOLUMES ARE STABALE IN PITS, WIPER TO WINDOW. CIRC OUT OF HOLE FOR BIT/MOTOR CHANGE. PJSM FOR BHA CHANGE IN OPS CAB. 16:00 - 16:45 0.75 DRILL N DFAL PROD1 AT SURFACE.FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD MOTOR AND INSPECT BIT. BIT GREEN.(1-1) REPLACE MOTR. CHANGE AKO FROM 1.2 TO 1.3 DEG. STAB COIL. TEST TOOLS.GET ON WELL. 16:45 - 18:45 2.00 DRILL N DFAL PROD1 RUN IN HOLE. LOG TIE IN WITH-5'CORRECTION 18:45 - 21:15 2.50 DRILL P PROD1 DRILL LATERAL FROM 9,221' FS 2,450 PSI @ 2.6 BPM MULTIPLE STALLS WITH BIT GRABBING ON BTM 19:30=9,237',2,765 PSI,0.6K WOB,9.77 ECD 21:00=9,328',3,094 PSI,1.4K WOB,9.82 ECD DRILL TO 9,351' 25 STALLS TOTAL AVG ROP 52 FPH Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 6 of 14 Operation Summary Report Common Well Name:15-32 DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.58(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 21:15 - 22:15 1.00 DRILL P . PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 22:15 - 00:00 1.75 DRILL P PROD1 DRILL LATERAL FROM 9,351' FS 2,650 PSI @ 2.6 BPM 23:00=9,372',2,775 PSI,0.9 K WOB,9.79 ECD 00:00=9,394',2,880 PSI,1.2K WOB,9.83 ECD 11 STALLS 7/8/2010 00:00 - 03:30 3.50 DRILL P PROD1 DRILL LATERAL FROM 9,394' FS 2,500 PSI @ 2.5 BPM 00:30=9,405',2,600 PSI,1.4K WOB,9.8 ECD MULTIPLE STALLS 02:40=9,471',2,830 PSI,0.9K WOB,9.87 ECD DRILL TO 9,498' 39 STALLS AVG ROP 30 FPH 03:30 - 04:30 1.00 DRILL P ® PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 04:30 - 07:30 3.00 DRILL P PROD1 DRILL LATERAL FROM 9,498' FS 2,430 PSI @ 2.4 BPM 05:00=9,511',2,700 PSI,0.9K WOB,9.85 ECD CONTINUE TO EXPERIENCE ON GOING STALLING PROBLEMS. APPEARS TO BE A STICK/SLIP ISSUE,POSSIBLY DUE TO WEIGHT XFER PROBLEMS IN CHROME TBG(?). DRILL TO 9536'. 07:30 - 10:00 2.50 DRILL N DPRB PROD1 HOLD PJSM TO DISCUSS FLUID MANAGEMENT WHILE TRIPPING. WIPER TO WINDOW. CIRC OUT OF HOLE. HOLD BHA PJSM NEAR SURFACE. 10:00 - 11:15 1.25 DRILL N DPRB PROD1 TAG UP. FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD MOTOR. BIT IN GOOD CONDITION 1-1. REPLACE MOTOR. ADD AGITATOR. MU USED HTC RWD BI-CENTER. STAB COIL. TEST TOOLS. GET ON WELL. PLAN IS TO ADD ADDITIONAL LUBES TO MUD TO HELP CHROME"FRICTION" 11:15 - 13:30 2.25 DRILL N DPRB PROD1 RUN IN HOLE. 13:30 - 13:45 0.25 DRILL N DPRB _ PROD1 LOG GR TIE IN TO RA TAG. ADD 1' CORRECTION. 13:45 - 14:15 0.50 DRILL N DPRB PROD1 WIPER TO BOTTOM. HOLE CLEAN. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 7 of 14 Operation Summary Report Common Well Name:15-32 DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 'X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:15 - 17:20 3.08 DRILL P PROD1 DRILL AHEAD FROM 9536'. 3150 PSI FS AT 2.50 BPM IN/OUT. 300-450 PSI MTR WORK. DHWOB:2.5-3.0 K# BHP/ECD/TVD:4547 PSI/9.93 PPG/8820 FT. IA/OA/PVT:260 PSI/0 PSI/420 BBLS. DRILL AHEAD WITH MINIMAL STALLING. SLIDING A MINOR BUT ONGOING ISSUE. REDUCE PUMP RATE TO 2.3 BPM IN OUT. SEEMS TO BE STALLING LESS. DRILL AHEAD TO 9700". 17:20 - 18:30 1.17 DRILL P PROD1 WIPER TRIP TO WINDOW WIPER CLEAN 18:30 - 22:45 4.25 DRILL P PROD1 DRILI I ATERAL FROM 9.700' • FS 2,940 PSI @ 2.3 BPM 19:30=9,748',3,380 PSI,3K WOB,9.89 ECD 20:30=9,783',3,420 PSI,1.7K WOB,9.97 ECD 21:30=9,813',3,280 PSI,3.7K WOB,9.88 ECD 22:30=9,841',3,400 PSI,3.1K WOB,9.91 ECD DRILL TO 9,853' AVG ROP 35 FPH 22:45 - 00:00 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW 7/9/2010 00:00 - 00:20 0.33 DRILL ' P PROD1 CONTINUE WIPER TRIP WIPER CLEAN 00:20 - 00:30 0.17 DRILL P PROD1 DRILL LATERAL FROM 9,853' FS 3,000 @ 2.3 BPM DRILL TO 9,856' HOT FAILURE 00:30 - 03:10 2.67 DRILL N DFAL PROD1 POH DUE TO HOT FAILURE OPEN EDC WHEN ABOVE WINDOW IPOH PJSM TO SWAP OUT HOT 15 MIN FROM SURFACE 03:10 - 03:25 0.25 DRILL N DFAL PROD1 PJSM TO SWAP HOT ON BHA 03:25 - 04:25 1.00 DRILL N DFAL — PROD1 SWAP HOT&DGS OUT ON BHA 04:25 - 06:00 1.58 DRILL N DFAL PROD1 TEST TOOLS @ SURFACE PJSM WITH SLB&NORDIC DRILLERS FOR TIN RIH WITH LATERAL BHA 06:00 - 06:15 0.25 DRILL N DFAL PROD1 LOG GR TIE IN. SUBTRACT 6'CORRECTION. 06:15 - 06:45 0.50 DRILL N DFAL PROD1 WIPER TRIP BACK TO BTM. HOLE SMOOTH. • Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 8 of 14 Operation Summary Report Common Well Name:15-32_DIMS j AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:45 - 12:30 5.75 DRILL P PROD1 DRILL AHEAD FROM 9856'. 3150 PSI FS AT 2.30 BPM IN/OUT. 300-400 PSI MTR WORK. 3-4K#DHWOB. BHP/ECD/TVD:4590 PSI/10.01 PPG/8827' IA/OA/PVT:339 PSI/0 PSI/412 BBLS. SUSPECT KAVIK HAS BEEN CONTACTED. BUILD ANGLE TO DRILL BACK UP THROUGH ZONE 1A TO ATTEMPT TO LOCATE ANY GOOD SAND TO PLAN A SIDETRACK. DRILL TO 10,000' 12:30 - 14:30 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW. MOTOR WORK AND SOME PULLS NOTED FROM 9950 TO 9750'. 3230 PSI FS AT 2.41 BPM IN. HOLE SMOOTH WHILE RIH. 14:30 - 18:00 3.50 DRILL C PROD1 DRILL AHEAD FROM 10,000. 3150 PSI FS AT 2.30 BPM IN/OUT. 300-400 PSI MTR WORK. 3-4K#DHWOB. BHP/ECD/TVD:4590 PSI/10.01 PPG/8827' IA/OA/PVT:339 PSI/0 PSI/412 BBLS. DRILL TO 10,150' 18:00 - 20:00 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW 20:00 - 21:00 1.00 DRILL C PROD1 DRILL LATERAL FRO 10,150' FS 3,100 PSI @ 2.3 BPM 20:30=10,192',3,600 PSI,1.7K WOB,10.18 ECD DRILL TO 10,240' FOUND 1B SANDS 21:00 - 00:00 3.00 DRILL C PROD1 POH TO ABOVE WINDOW&OPEN EDC CONTINUE TO POH 7/10/2010 00:00 - 00:30 0.50 DRILL C PROD1 POH FLOW CHECK WELL @ SURFACE=NO FLOW= 00:30 - 00:45 0.25 DRILL C PROD1 PJSM TO LD LATERAL BHA 00:45 - 01:15 0.50 DRILL C PROD1 LD LATERAL BHA AAR FOR LD OF LATERAL BHA 01:15 - 01:30 0.25 DRILL C PROD1 PJSM TO CUT COIL 01:30 - 04:00 2.50 DRILL C PROD1 CUT 250'COIL FOR CHROME MANAGEMENT RE-HEAD COIL PULL&PT CTC&BHI UQC 04:00 - 04:15 0.25 DRILL C PROD1 PJSM TO MU BILLET BHA 04:15 - 05:10 0.92 STKOH C PROD1 MU BILLET BHA STAB ON INJECTOR TEST TOOLS @ SURFACE 05:10 - 07:15 2.08 STKOH C PROD1 RIH WITH BILLET BHA 07:15 - 07:30 0.25 STKOH C PROD1 LOG GR TIE IN. SUBTRACT 3'CORRECTION. 36K#UP,28K#DN WT. CLOSE EDC. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 9 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:15 0.75 STKOH C PROD1 RUN IN HOLE VERY SLOWLY. PLACE TOP OF BILLET AT 9050'. PU TO UP WT TO REMOVE COIL SLACK. PRESSURE COIL TO 4000 PSI. SETTING TOOL ACTIVATED. SET 2k#DN WT. NO MOVEMENT. PU IS CLEAN AT 36K#. 08:15 - 10:15 2.00 STKOH C PROD1 PULL OUT OF HOLE. MONITOR HOLE FILL. HOLD PJSM NEAR SURFACE. 10:15 - 12:30 2.25 STKOH C PROD1 aAT SURFACE. GET OFF WELL UNSTAB COIL. LD INTEQ TOOLS. LD BTT TOOLS. SETTING TOOLS LOOK NOMINAL. • REMOVE TOOLS FROM RIG. ,, n 12:30 - 15:15 2.75 BOPSUR P PROD1 WEEKLY FUNCTION TEST OF BOPS. hhK OPEN LOWEST RAM DOOR. NO METAL OR DEBRIS FOUND. TEST DOOR. LEAKING. REPLACE DOOR SEAL. TEST GOOD. 15:15 - 16:00 0.75 STKOH C PROD1 MU LATERAL BHA WITH 1.3 AKO,USED HCC BICENTER,AGITATOR. STAB COIL. TEST TOOLS. GET WELL. 16:00 - 17:30 1.50 STKOH C PROD1 RUN IN HOLE. CIRC AT MIN RATE. 17:30 - 18:05 0.58 STKOH C PROD1 LOG GR TIE IN. 0Ot -2'CORRECTION j" RIH TO TOP OF BILLET 18:05 - 20:10 2.08 STKOH C PROD1 TAGBILLET 9.049.1' START TIME DRILLING SIDETRACK @ 1 FPH AG PER RP FS 3,050 PSI @ 2.4 BPM TIME DRILL TO 9,050.1' 328 DRILL KICK-OFF WITH 0.5K WOB&200 PSI MTRWORK GRADUALLY ADD WT&FINISH KICK OFF TO 9,066' 20:10 - 20:40 0.50 DRILL C PROD1 DRILL LATERAL FROM 9,066' FS 3,050 PSI @ 2.4 BPM 200-300 PSI MTR WK 0.5K TO 1.6K WOB DRILL TO 9,097' DATA PROBLEMS WITH BHI TOOLS 20:40 - 21:40 1.00 DRILL N DEAL PROD1 DATA PROBLEMS WITH BHI PU INTO CASED HOLE WHILE TROUBLESHOOTING PROBLEM CONFIRMED BHI DATA INPUT RIH TO TD 21:40 - 00:00 2.33 DRILL C PROD1 nRII I I AIERAL FROM 9.097' FS 3,050 PSI @ 2.4 BPM 200-350 PSI MTR WK,1K-2K WOB,10.21 ECD SWAPPED TO NEW MUD SYSTEM DRILL TO 9,180' Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 10 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM 1Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/11/2010 00:00 - 01:20 1.33 DRILL C PROD1 DRILL LATERAL FROM 9,185' FS 3,130 PSI @ 2.4 BPM 200-350 PSI MTR WK,1K-3.5K WOB,10.03 ECD DRILL TO 9,250' 01:20 - 02:05 0.75 DRILL C PROD1 WIPER TO WINDOW DROP PR TO 0.5 BPM WHEN PASSING BILLET 02:05 - 04:35 2.50 DRILL C PROD1 DRILL LATERAL FROM 9,250' FS 3,130 PPSI @ 2.4 BPM 200-400 PSI MTR WK,1K-3.5K WOB,10.03 ECD DRILL TO 9,400' 04:35 - 05:15 0.67 DRILL C PROD1 WIPER TO WINDOW DROP PR TO 0.5 BPM WHEN PASSING BILLET 05:15 - 05:40 0.42 DRILL C PROD1 GEO FOUND QUITE A BIT OF COAL IN SAMPLE OPEN EDC&JET 7"WHILE WAITING FOR GEO TO DECIDE WHICH DIRECTION TO DRILL 05:40 - 06:30 0.83 DRILL C PROD1 LOG TIE IN WITH+5'CORRECTION RIH 06:30 - 09:30 3.00 DRILL C PROD1 DRILL AHEAD FROM 9400'. 3250 PSI FS AT 2.32 BPM IN/OUT. 300-400 PSI MTR WORK. BHP/ECD/TVD:4622 PSI/10.11 PPG/8808 FT IA/OA/PVT:242 PSI/0 PSI/265 BBLS. DRILL TO 9550'. 09:30 - 10:00 0.50 DRILL C PROD1 WIPER TRIP TO WINDOW. HOLE SMOOTH. 10:00 - 12:15 2.25 DRILL C PROD1 DRILL AHEAD FROM 9550'. 3350 PSI FS AT 2.32 BPM IN/OUT _ ROP VARIABLE,AVG OVER 50 FPH. 12:15 - 12:45 0.50 DRILL C PROD1 WIPER TRIP TO WINDOW. HOLE SMOOTH. 12:45 - 15:00 2.25 DRILL C PROD1 DRILL AHEAD FROM 9700'. 3400 PSI FS AT 2.32 BPM IN/OUT. DRILL TO 9850' 15:00 - 16:00 1.00 DRILL C PROD1 WIPER TRIP TO WINDOW. CIRC OUT 7". LOG GR TIE IN.ADD 3'CORECTION. WIPER IN HOLE. HOLE SMOOTH. 16:00 - 21:00 5.00 DRILL C PROD1 _DRILL AHEAD FROM 9850'. 3350 PSI FS AT 2.30 BPM IN/OUT. 300-450 PSI MTR WORK 2.5-3.5K#DHWOB. I/VOA/PVT: 347 PSI/0 PSI/244 BBLS(ACTIVE) DRILL AHEAD TO 10,000' 21:00 - 22:45 J 1.75 DRILL C PROD1 WIPER TRIP TO WINDOW 22:45 - 00:00 1.25 DRILL C PROD1 DRILL LATERAL FROM 10,000' FS 3,250 PSI @ 2.3 BPM 250-550 PSI MTR WK 1K-4K WOB,10.31 ECD DRILL TO 10,020 Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 11 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud DatefTime:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) (ft) 7/12/2010 00:00 - 03:00 3.00 DRILL C PROD1 DRILL LATERAL FROM 10,020' FS 3,250 PSI @ 2.3 BPM 250-650 PSI MTR WK 1K-4K WOB,10.42 ECD DRILL TO 10,150' AVG ROP 43 FPH 03:00 - 04:50 1.83 DRILL C PROD1 WIPER TRIP TO WINDOW 04:50 - 06:30 1.67 DRILL C PROD1 DRILL LATERAL FROM 10,020' FS 3,350 PSI @ 2.3 BPM 250-650 PSI MTR WK 1K-4K WOB,10.42 ECD CREW CHANGE. DISCUSS OPERATIONS. MAKE RIG ROUNDS AND CHECKS. CONTINUE TO DRILL AHEAD. 06:30 - 09:15 2.75 DRILL P PROD1 DRILL AHEAD FROM 10,225'. 3410 PSI FS AT 2.31 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. ROP:30-50 FPH. BHP/ECD/TVD:4771 PSI/10.47 PPG/8779 FT IA/OA/PVT:455 PSI/0 PSI/na. PREP FOR MUD SWAP. DRILL TO 10,300' 09:15 10:30 1.25 DRILL P PROD1 'WIPER TRIP TO WINDOW. REDUCE RATE ACROSS BILLET AT 9050'. 2780 PSI FS AT 2.34 BPM IN. HOLE SMOOTH. 10:30 - 13:45 3.25 DRILL P PROD1 DRILL AHEAD FROM 10,300' 3200 PSI FS AT 2.40 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. VARIABLE ROP. AVG:30-40 FPH PUMP PRESSURE REDUCED WITH NEW MUD AROUND. DRILL TO 10450'. 13:45 - 16:25 2.67 DRILL P PROD1 WIPER TRIP TO WINDOW. 3100 PSI FS AT 2.40 BPM IN/OUT. 16.25 - 19:30 3.08 DRILL P PROD1 DRILL AHEAD FROM 10,450' 3200 PSI FS AT 2.40 BPM IN/OUT. 300-400 PSI MTR WORK. 2-3K#DHWOB. VARIABLE ROP. AVG:30-40 FPH DRILL TO 10,600'. 19:30 - 21:30 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW SLOW PR WHEN PASSING BILLET 21:30 - 00:00 2.50 DRILL N SFAL PROD1 FOUND 2 BLOCK KEEPERS BROKEN ON THE CHAIN REDUCED PUMP TO MIN RATE 7/13/2010 00:00 - 01:30 1.50 DRILL N SFAL PROD1 CONTINUE REPLACING INJECTOR GRIPPER BLOCKS 01:30 - 02:30 1.00 DRILL P PROD1 CONTINUE WIPER TO TD Printed 8/10/2010 11:17:39AM North America-ALASKA- BP Page 12 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.55(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 06:30 4.00 DRILL P PROD1 DRILL AHEAD FROM 10,600' FS 3,050 PSI @ 2.3 BPM 200-450 PSI MTR WK,1.5K-3.5K WOB,ECD 10.19 DRILL TO 10,750' AVG ROP 37.5'FPH 06:30 - 09:30 3.00 DRILL P PROD1 WIPER TRIP TO WINDOW. MOTOR WORK FROM 9040'TO 9000' OVERPULLS INSIDE 7"AS BIT AND MOTOR APPROACH THE TBG TAIL AT 8621'. OPEN EDC AND CIRC OUT 7'FROM ABOVE WINDOW AND TBG TAIL. 4.2 BPM AT 3750 PSI. WORK OPEN EDC ACROSS TBG TAIL. PULL UP THROUGH TBG TAIL WITH MIN RATE. MAX PULL WAS 49.7K#. BROKE BACK TO NORMAL UP WT OF 34K#. BRING PUMP UP TO FULL RATE AND PULL UP PAST TBG TAIL WITH BIT AGAIN. •PROBLEM HAS CLEARED UP. 09:30 - 09:45 0.25 DRILL P PROD1 LOG GR TIE IN FROM 8720'. ADD 3' CORRECTION. 09:45 - 11:15 1.50 DRILL P PROD1 WIPER BACK TO BTM. 3329 PSI FS AT 2.49 BPM IN IN LATERAL SECTION. HOLE SMOOTH. 11:15 - 13:15 2.00 DRILL P PROD1 DRILL AHEAD FROM 10.750'. 3215 PSI FS AT 2.40 BPM IN/OUT. ROP VARIABLE:60-80 FPM,THEN STACK OUT. DRILL TO 10,900'. 13:15 - 14:45 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW. 3160 PSI FS AT 2.39 BPM IN. 14:45 - 21:00 6.25 DRILL P PROD1 DRILL AHEAD FROM 10,900'. 3450 PSI FS AT 2.51 IN/OUT. DRILL AHEAD TO 11050'MD. 21:00 - 22:45 1.75 DRILL P PROD1 WIPER TO WINDOW(CLEAN). 22:45 - 00:00 1.25 DRILL P PROD1 DRILL AHEAD FROM 11050'MD.PERFORM MUD SWAP TO NEW POWERVIS. DRILLING PARAMETERS AT 11169'MD: 3190 PSI AT 2.38 BPM W/FULL RETURNS AT 80 FPH ROP W/1.7K LB WOB AND 14200 LB SURFACE WEIGHT. PVT/ECD/BHP:111/9.97 PPG/4530 PSI. IAP:330 PSI OAP:0 PSI CONTINUED ON REPORT 07/14/2010 7/14/2010 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUED FROM REPORT 07/13/2010. IAP:330 PSI. OAP:0 PSI. DRILL AHEAD TO 11200'MD. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 13 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 05:40 3.67 DRILL PROD1 WIPER TO WINDOW. OPEN ECD IN 7"LINER. JET LINER TO TT,THEN BACK DOWN TO TRAY OF WS AND BACK UP TO TT. NO INCREMENTAL CUTTINGS RETURN WAS NOTICED WITH THE BOTTOMS-UP ASSOCIATED WITH THIS JETTING RECIPROCATION.TIE-IN,CORRECTION OF(+7.5'). 05:40 - 06:25 0.75 DRILL PROD1 DRILL AHEAD FROM 11,200' FS 3,150 PSI @ 2.3 BPM DRILL TO 10,214' 06:25 - 09:50 3.42 DRILL DFAL PROD1 LOST COMMUNICATION WITH BHI TOOLS POH TO ABOVE WINDOW TO TROUBLE SHOOT TOOL P&C FAILURE POH TO SWAP OUT TOOLS PJSM TO SWAP OUT BHA WHILE POH 09:50 - 11:15 1.42 DRILL DFAL PROD1 LD FAULTY BHA COMPONENTS **NOTE**2"OF STATOR SHAFT EXPOSED WHEN BHA WAS BROUGHT TO SURFACE,125HRS ON MOTOR.ALL HOURS ON MOTOR WERE RUN WITH AN AGITATOR. EXCESS VIBRATION FROM AGITATOR POSSIBLE CAUSE FOR MOTOR CONDITION 11:15 - 11:30 0.25 DRILL N DFAL PROD1 AAR FOR LD FAULTY BHA COMPONENTS PJSM TO MU LATERAL BHA 11:30 - 12:00 0.50 DRILL N DFAL PROD1 MU NEW LATERAL BHA 12:00 - 15:00 3.00 DRILL N DFAL PROD1 TEST TOOLS @ SURFACE RIH WITH LATERAL BHAASSY LOG TIE IN WITH-4'CORRECTION CONTINUE TO RIH TO TD 15:00 - 18:00 3.00 DRILL P PROD1 DRILL LATERAL FROM 11,214' FS 2,960 @ 2.4 BPM 200-300 PSI MTR WK,1-3.5K WOB,10.08 ECD DRILL AHEAD TO 11350'MD. 18:00 - 21:00 3.00 DRILL P PROD1 WIPER TO WINDOW FROM 11350'MD,CLEAN. 21:00 - 00:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11350'MD. FREESPIN 3020 PSI AT 2.4 BPM DRILL AHEAD AT 2.4 BPM AT 3400 PSI W/2.1K LB WOB AND 16000 LB SURFACE WEIGHT WITH FULL RETURNS. PVT/ECD/BHP:257/10.22 PPG/ 4644 PSI. ROP—60 FPH. IAP:460 PSI OAP:0 PSI AT MIDNIGHT,DRLLING AHEAD AT 11449'MD. CONTINUED ON REPORT 07/15/2010. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 14 of 14 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/4/2010 End Date:7/15/2010 X3-00W02-C(1,285,456.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/15/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUED FROM REPORT 07/14/2010. IAP:460 PSI OAP:0 PSI. DRILLING AHEAD AT 11449'MD AT 2.4 BPM AT 3260 PSI W/1.2K LB WOB AND 18000 LB SURFACE WEIGHT WITH FULL RETURNS. PVT/ECD/BHP:252/10.06 PPG/4655 PSI. ROP: 55 FPH. DRILL TO 11500'MD. 01:00 - 04:00 3.00 DRILL P PROD1 WIPER TO WINDOW FROM 11500'MD. 03:30-FIRE DRILL(SIMULATING A FIRE IN THE SCR ROOM). 04:00 - 06:30 2.50 DRILL P PROD1 DRILL AHEAD FROM 11500'MD. DRILLING AHEAD AT 2.4 BPM AT 3625 PSI W/ FULL RETURNS W/1900 LB WOB AND 18000 LB SURFACE WEIGHT. PVT/ECD/BHP:237/10.06 PPG/4695 PSI. ROP:50 FPH. DRILL TO 11,620'TD 06:30 - 10:30 4.00 DRILL P PROD1 FINAL WIPER TO WINDOW PUMP LOW VIS SWEEP TO CLEAR OH ON WIPER **NO INCREASE IN CUTTINGS RETURNED TO SURFACE FROM LOW VIS SWEEP** PU TO TUBING TAIL&OPEN EDC JET 7"FROM TOWS TO WLEG LOG TIE IN WITH+5'CORRECTION PU TO 8,560'&LOG CCL TO 8,720' PU&CLOSE EDC 10:30 - 12:45 2.25 DRILL P PROD1 RIH TO TD =MN TAG&CONFIRM TD a(w7 11.624' —_ 12:45 - 16:30 3.75 DRILL P PROD1 POH LAYING IN LINER RUNNING PILL WITH ALPINE BEADS PAINT EOP FLAG @ 8,450' PAINT TOP OF WINDOW FLAG @ 5,587' CONTINUE TO POH TO SURFACE FLOW CHECK WELL @ SURFACE*NO FLOW 116:30 - 16:40 0.17 DRILL P PROD1 PJSM TO LD DRILLING BHA 16:40 - 17:00 0.33 DRILL P PROD1 LD DRILLING BHA. BIT GRADED 1,2(CHIPPED CUTTERS) END OF RON REPORT. CONTINUED ON CON REPORT 07/15/2010. Printed 8/10/2010 11:17:39AM North America-ALASKA-BP Page 1 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/15/2010 17:00 - 17:20 0.33 CASING P RUNPRD CONTINUED FROM RON REPORT 07/15/2010. PJSM FOR PUMPING SLACK. 17:20 - 19:30 2.17 CASING P RUNPRD PUMP SLACK. RECOVER 195'TOTAL ELINE (-83'SLACK THEORETICALLY REMAINING IN REEL). 19:30 - 21:15 1.75 CASING P RUNPRD PUMP 0.75"DRIFT BALL THORUGH CT AND RECOVER. 21:15 - 22:15 1.00 CASING P RUNPRD MU CTC. PULL TEST TO 40K-GOOD. PT TO 3600 PSI,GOOD. 22:15 - 22:45 0.50 CASING P RUNPRD PJSM FOR MU LINER. 22:45 - 00:00 1.25 CASING P RUNPRD MU LINER. CONTINUED ON CON REPORT 07/16/2010 7/16/2010 00:00 - 04:15 4.25 CASING P RUNPRD CONTINUED FROM CON REPORT 07/15/2010. CONTINUE MU AND DEPLOY LINER. 04:15 - 07:20 3.08 CASING P RUNPRD STAB ON. RIH WITH LINER RIH TO 11,620'GET PU WT OF 48.5K RIH&TAG TD CONFIRMED WITH FLAG UNCORRECTED @ 11,627.6' PU TO 11,608',RIH&CONFIRM TD UNCORRECTED @ 11,626.5' PU TO BALL DROP POSITION @ 11,604' 07:20 - 07:30 0.17 CASING j_ P RUNPRD PJSM TO DROP&LAUNCH 5/8"STEEL BALL 07:30 - 08:40 1.17 ' CASING P RUNPRD LOCK OUR REEL BRAKE&PIN REEL LOAD 5/8"STEEL BALL LAUNCH BALL WITH 1,500 PSI PUMP @ 2 BPM TO CHASE BALL OUT OF REEL LOST 10K WT STOPPED PUMPS RIH&TAG TD @ 11,626.5' PU&CONFIRMED PU WT 2 TIMES LINER STILL ATTACHED STACK 10K WT&CONTINUE PUMPING BALL BALL ON SEAT @ 32.8 BBLS PRESSURE UP TO&BREAK OVER @ 4,500 PSI PU WT BREAKOVER @ 11,623'@ 34K RIH&PU AGAIN TO CONFIRM LINER RELEASE 08:40 - 12:10 3.50 CEMT N WAIT RUNPRD WAIT FOR TRUCKS TO SWAP WELL TO KCL TRUCKS&DRIVERS UNAVAILABLE FROM CH2MHILL FOR FLUID DELIVERY/HAUL OFF CENTRAL DISPATCH UNREACHABLE(PHONE BUSY)TO ORDER PEAK TRUCKS UNTIL 08:50 AM 12:10 - 14:30 2.33 CEMT P RUNPRD CIRCULATE WELL TO 2%KCL DBL SLK BUILD 100 BLS 2PPB BIOZAN PJSM WITH CEMENT CREW TO SPOT EOIPMENT& RU RU CEMENTERS WHILE SWAPPING WELL TO KCL 14:30 - 15:00 0.50 CEMT P RUNPRD PJSM FOR CEMENT JOB Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 2 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 17:40 2.67 CEMT P RUNPRD BYPASS HP SCREENS IN REELHOUSE BATCH UP CEMENT @ 15:20 PM PT CEMENTERS LINES TO 4,000 PSI PUMP CMT ZERO IN MM WHEN 15 PPG DENSITY IS SEEN PUMP 34 BBLS OF CML- LINE UP TO PUMP 2 PPB BIOZAN CHASE CMT WITH 2 PPB BIO SHUT DOWN PUMPS @ 88 BBLS PU TO BREAK OVER @ 11,623.3'BO WT @ 39K PU AN ADDITIONAL 13'TO 11,610.3' SET BACK DOWN @ 11,616.9'STACK 10K ON COIL PRESSURE UP TO 500 PSI&HOLD PRESSURE PU&SEE PRESSURE DROP OFF OUT MM @ 88.8BBLS SIDE EXHAUST 2 BBLS CMT&3 BBLS BIO ZAN OUT MM @ 93.8 BBLS �. SET BACK DOWN @11,619.8'&STACK 10K �- DOWN ON COIL PRESSURE UP&SHEAR LWP @ 3,050 PSI @ 94.6 BBLS ON MM CALCULATED LWP BUMP @ 17.7 BBLS OR 112.3 BBLS TOTAL ON IN MM LWP BUMP @ 110.9 BBLS TOTAL ON MM PRESSURE UP TO 1,000 PSI OPEN BAKER CHOKE&CHECK FLOATS —FLOATS HOLDING PRESSURE UP TO 500 PSI&PU PRESSURE DROPPED @ 11,612' CIRCULATE @ TOP OF LINER FOR 5 BBLS 17:40 - 20:00 2.33 CEMT P RUNPRD POH PUMPING @ 1 BPM W/FULL RETURNS. RETURNED-2 BBLS OF 11.0 PPG DENSITY CONTAMINATED CEMENT AS POOH. '20:00 - 20:50 0.83 CEMT P RUNPRD PJSM. UNSTAB. LD LINER RUNNING ASSEMBLY. RECOVER BALL. CONFIRM TOOL SHEARED AS DESIGNED. 20:50 - 21:30 0.67 CEMT P RUNPRD MU SWIZZLE STICK. JET STACK W/3 RECIPROCATIONS. CHASE OUT DEAD LEGS FROM SURFACE IRON. 21:30 - 22:30 1.00 CEMT P RUNPRD UNSTAB,LD SWIZZLE STICK. PSJM FOR MU CLEANOUT ASSEMBLY,LOGGING TOOL,CSH. 22:30 - 00:00 1.50 CEMT P RUNPRD MU AND DEPLOY CLEANOUT ASSEMBLY, _LOGGING TOOL,CSH. IAP:85 PSI OAP:0 PSI CONTINUED ON REPORT 07/17/2010 Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 3 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11 N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code ' NPT ' NPT Depth Phase Description of Operations (hr) (ft) 7/17/2010 00:00 - 04:00 4.00 CONDHL P OTHCMP CONTINUED FROM REPORT 07/16/2010 IAP:85 PSI OAP:0 PSI. CONTINUE MU AND DEPLOY CSH. BREAK i CIRCULATION EVERY—35 JTS TO CONFIRM WORKSTRING IS NOT PLUGGED W/ SCALE/DEBRIS. RECEIVE UCA RESULTS(IN PROGRESS)FROM SLB. CEMENT AT 500 PSI AT 9 HOURS 11 MINUTES AFTER START OF TEST. 04:00 - 04:50 0.83 CONDHL P OTHCMP W/CLEANOUT ASSEMBLY W/2.30"MILL/ MCNL LOG IN CARRIER/CSH SPACER PIPE. CIRCULATE AT 0.35 BPM WHILE RIH W/FULL RETURNS. AT 5700'MD-0.35 BPM AT 375 PSI. 04:50 - 07:00 2.17 CONDHL P .OTHCMP LOG MCNL DOWN FROM 8,080'@ 30 FPM TAG PBTD @ 11,585'UNCORRECTED 07:00 - 08:00 1.00 CONDHL P OTHCMP CRICULATE PERF PILL TO BIT 08:00 - 09:00 1.00 CONDHL P OTHCMP LOG UP @ 60 FPM LAYING IN PERF PILL PAINT FLAG @ 11,000'MD LOG UP TO 8,080' 09:00 - 10:15 1.25 CONDHL P OTHCMP POH WITH MCNL ASSY 10:15 - 10:30 0.25 PERFOB P OTHCMP PJSM TO LAOD PERF GUNS INTO THE PIPE SHED 10:30 - 11:30 1.00 PERFOB P OTHCMP LOAD PERF GUNS INTO THE PIPE SHED 11:30 - 11:45 025 PERFOB P OTHCMP PJSM TO LD MCNL BHA 11:45 - 16:00 4.25 PERFOB P OTHCMP LD MCNL BHA LD PH-6 CONNECT HEAD PIN TO CSH&FLUSH WITH FRESH WATER STAND BACK CSH IN DERRICK&LD MCNL ASSY 16:00 - 16:15 0.25 PERFOB P OTHCMP PJSM TO PT LINER LAP TO 2,000 PSI Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 4 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) I Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs I Task Code j NPT NPT Depth Phase Description of Operations (hr) — (ft) 16:15 - 00:00 7.75 PERFOB P OTHCMP LINE UP&TEST LINER LAP PRESSURE UP TO 2,000 PSI PRESSURE BLED OFF TO 1,838 PSI IN 30 MIN. RETEST FOR LONGER DURATION. FINAL RESULTS: TIME 20:05-1845 PSI �_` TIME 20:20-1827 PSI At TIME 20:35-1810 PSI. CONFIRMED WITH TOWN ENGINEER THAT THIS 1 CONSTITUTES A PASSING LINER LAP AND WILL NOT REQUIRE A LTP. THIS CHARTED LINER LAP PT IS FILED IN WELL FILE. SIMULTANEOUS TO THE LINER LAP PRESSURE TEST: REVIEW MCNL DATA(GOOD DATA). SLB UP/DOWN PASSES SHOW GOOD OVERLAY, BUT AFTER CORRECTING TO PDC LOG AT TOP OF PERF INTERVAL ARE OFF DEPTH FROM THE BAKER MWD LOG FROM–11100'DOWN. INVESTIGATE,BELIEVE SLB MCNL DATA TO BE CORRECT. SEND INFO TO TOWN ENGINEER- RECEIVE ORDERS TO SHIFT PERF DEPTHS BY 3' TO SPLIT THE DIFFERENCE. FUNCTION TEST BOPE. PJSM FOR MU PERF GUNS. IAP:80 PSI OAP:0 PSI CONTINUED ON REPORT 07/18/2010 7/18/2010 00:00 - 05:30 5.50 PERFOB P OTHCMP CONTINUED FROM REPORT 07/17/2010 IAP:80 PSI OAP:0 PSI MU AND DEPLOY PERFORATING GUNS. MU CSH AND PERF BHA. 05:30 - 05:50 0.33 PERFOB P OTHCMP RIH W/PERF ASSEMBLY. 05:50 - 08:20 2.50 PERFOB N DFAL OTHCMP LOST ELECTRICAL POWER TO OPS CAB SHUT DOWN PUMPS&STOPPED RIH TROUBLE SHOOT ELECTRICAL POWER SUPPLY TO OPS CAB SLB LINE CONDITIONER FOUND TO BE FAULTY PJSM TO REPAIR ELECTRICAL SUPPLY TO OPSCAB REPAIRED LINE 08:20 - 10:30 2.17 PERFOB P OTHCMP RIH WITH PERF ASSY WT CHECK @ 11,500'UP WT 44K @ 20 FPM TAG PBTD UNCORRECTED @ 11,583.8'PU& CONFIRM 11,583.8'PBTD RESET DEPTH TO 11,572'IN CORRELATION WITH MCNL LOGS PU TO 11,480' 10:30 - 11:00 0.50 PERFOB P OTHCMP PERF WELL AS PER SLB E-FIRE PROCEDURE FIRED GUNS POH ON DEPTH @ 11,477' POSITIVE INDICATION OF GUNS FIRING ON SLB SHOT DETECTOR&ALSO BY WT Printed 8/10/2010 11:18:23AM North America-ALASKA-BP Page 5 of 5 Operation Summary Report Common Well Name:15-32_DIMS AFE No Event Type:COM-ONSHORE(CON) Start Date:7/15/2010 End Date:7/19/2010 X3-00W02-C(1,214,032.00) Project:Prudhoe Bay Site:PB DS 15 Rig Name/No.:NORDIC 2 Spud Date/Time:9/17/2001 12:00:00AM Rig Release:7/19/2010 Rig Contractor:NORDIC CALISTA UWI:1976'SNL,333'EWL,SEC 22,T11N,R14E UM Active Datum:70.5 @70.5ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 13:00 2.00 PERFOB P OTHCMP POH WITH PERF ASSY STOP ABOVE TOL&FLOW CHECK WELL**NO FLOW** CONTINUE TO POH PJSM TO STAND BACK CSH WHEN 15 MIN FROM SURFACE FLOW CHECK WELL @ SURFACE*`NO FLOW** 13:00 - 14:30 1.50 PERFOB P OTHCMP STAND BACK INJECTOR STAND BACK CSH IN DERRICK 14:30 - 15:00 0.50 PERFOB P OTHCMP PJSM TO LD PERF GUNS IN THE PIPE SHED 15:00 - 21:30 6.50 PERFOB P OTHCMP LD PERF GUNS IN THE PIPE SHED. ALL SHOTS FIRED. PERF GUNS ARE 2.0"HSD PJ 2006,6 SPF,60 DEG PHASING,SLB. PERFORATED INTERVALS: 9317'-9437'MD 9537'-9797'MD 10017'-10137'MD 10317'-10527'MD 10637'-10677'MD 10757'-10787'MD 10837'-10877'MD 10927'-11237'MD 11287'-11307'MD 11387'-11477'MD 21:30 - 23:00 1.50 CONDHL P OTHCMP MU NOZZLE. RIH TO 2500'CTMD. CIRCULATE IN 80 DEG F DIESEL FOR FP FROM 2500'CTMD TO SURFACE(DIESEL PUMPED BY LRS). PUMP 50 BBLS DIESEL TOTAL. POOH W/NOZZLE. 23:00 - 00:00 1.00 CONDHL P OTHCMP OOH. CLOSE SWAB,BLOWDOWN STACK. BLOWBACK CT. PJSM FOR GREASE WELLHEAD AND SET BPV. CONTINUED ON REPORT 07/19/2010 7/19/2010 00:00 - 01:30 1.50 RIGD P OTHCMP CONTINUED FROM REPORT 07/18/2010. GREASE TREE VALVES. SET BPV. 01:30 - 02:00 0.50 RIGD P OTHCMP UNSTAB CT. 02:00 - 02:25 0.42 RIGD P OTHCMP SECURE CT TO REEL. 02:25 - 02:45 0.33 RIGD P OTHCMP RIG DOWN FARR TONGS AND HOOK UP BOP CABLES. 02:45 - 07:30 4.75 RIGD P PRE PJSM FOR ND LUBRICATOR AND BOPE. ND LUBRICATOR AND BOPE. 07:30 - 08:00 0.50 MOB P PRE PJSM TO MOVE OFF WELL '08:00 - 10:00 2.00 MOB P PRE MOVE OFF WELL 15-32B MOVE RIG TO ENTRANCE OF PAD CLEAR RIGSITE @ 15-32B&HAVE PERMIT SIGNED OFF BY PAD OPERATOR RELEASED RIG @ 10:00 PJSM TO MOVE RIG TO DS-02 Printed 8/10/2010 11:18:23AM Mill BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 15 15-32_DIMS - Slot 32 1976' SNL, 333' EWL, SEC 22, T11N, R14E UM 15-32BPB1 Survey: MWD Survey Report - Geographic 19 July, 2010 Qbp Ras BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32BPB1 Survey Calculation Method: Minimum Curvature Design: 15-32BPB1 Database: EDM.16-Anc Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 15,TR-11-14 Site Position: Northing: 5,958,837.36ft Latitude: 70°17 35.236 N From: Map Easting: 676,296.98ft Longitude: 148°34'21.213 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.34 ° Well 15-32_DIMS API No 500292246200 Well Position +N/-S 0.00 ft Northing: 5,959,812.81 ft Latitude: 70°17 44.833 N' +E/-W 0.00 ft Easting: 676,277.02 ft Longitude: 148°34'21.128 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 31.00 ft Wellbore 15-32BPB1 API No 500292246271 I Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2009 4/15/2010 22.28 80.94 57,691 Design 15-32BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 8,664.38 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 39.50 0.00 0.00 344.18 Survey Program Date: 7/19/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 128.00 8,664.38 MWD(15-32PB1) MWD MWD-Standard 8,683.00 10,240.00 MWD(15-32BPB1) MWD MWD-Standard 7/19/2010 8:55:36AM Page 2 COMPASS 2003.16 Build 71 BAKER MOMS Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5©70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32BPB1 Survey Calculation Method: Minimum Curvature Design: 15-32BPB1 Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 8,664.38 34.34 120.54 8,624.44 -157.64 126.96 5,959,658.20 676,407.63 70°17'43.282 N 148°34'17.428 W TIP 8,683.00 35.78 120.08 8,639.68 -163.04 136.19 5,959,653.02 676,416.99 70°17 43.229 N 148°34'17.159 W KOP 8,684.70 35.43 119.56 8,641.06 -163.53 137.05 5,959,652.55 676,417.86 70°17'43.224 N 148°34'17.134 W 29.67 108.56 8,666.78 -170.31 151.92 5,959,646.13 676,432.88 70°17'43.158 N 148°34'16.700 W' 8,745.75 18.82 87.31 8,694.65 -172.49 164.07 5,959,644.23 676,445.08 70°17'43.136 N 148°34'16.346 W 8,776.55 26.04 67.40 8,723.14 -169.66 175.31 5,959,647.33 676,456.24 70°17'43.164 N 148°34'16.019 W 8,805.85 31.00 49.97 8,748.92 -162.31 187.05 5,959,654.94 676,467.81 70°17'43.236 N 148°34'15.677 W 8,835.72 39.59 32.75 8,773.34 -149.30 198.13 5,959,668.21 676,478.59 70°17'43.364 N 148°34'15.353 W 8,865.74 45.57 16.59 8,795.50 -130.91 206.40 5,959,686.78 676,486.42 70°17'43.545 N 148°34'15.112 W 8,895.70 48.72 358.09 8,815.97 -109.31 209.09 5,959,708.45 676,488.61 70°17'43.758 N 148°34'15.034 W 8,926.35 50.94 341.09 8,835.82 -86.44 204.84 5,959,731.21 676,483.81 70°17'43.982 N 148°34'15.158 W 8,958.01 57.16 326.85 8,854.46 -63.57 193.53 5,959,753.80 676,471.97 70°17'44.207 N 148°34'15.487 W 8,989.06 62.81 312.33 8,870.05 -43.26 176.10 5,959,773.70 676,454.08 70°17'44.407 N 148°34'15.995 W 9,020.82 73.24 303.93 8,881.94 -25.18 152.95 5,959,791.23 676,430.50 70°17'44.585 N 148°34'16.670 W 9,050.07 85.76 302.91 8,887.26 -9.37 128.99 5,959,806.47 676,406.18 70°17'44.740 N 148°34'17.369 W 9,080.21 92.27 302.88 8,887.78 6.98 103.70 5,959,822.23 676,380.52 70°17'44.901 N 148°34'18.106 W 9,109.61 91.01 300.20 8,886.94 22.35 78.65 5,959,837.01 676,355.12 70°17'45.052 N 148°34'18.836 W 9,140.25 88.53 299.54 8,887.06 37.61 52.08 5,959,851.64 676,328.20 70°17'45.202 N 148°34'19.610 W 9,170.26 86.68 300.21 8,888.31 52.55 26.09 5,959,865.95 676,301.86 70°17'45.349 N 148°34'20.368 W 9,199.99 89.39 304.27 8,889.33 68.39 0.96 5,959,881.21 676,276.38 70°17'45.505 N 148°34'21.100 W 9,229.95 89.20 307.90 8,889.70 86.03 -23.24 5,959,898.27 676,251.77 70°17'45.679 N 148°34'21.806 W 9,260.76 87.70 311.54 8,890.54 105.71 -46.93 5,959,917.39 676,227.63 70°17'45.872 N 148°34'22.496 W 9,290.22 90.00 316.90 8,891.13 126.25 -68.03 5,959,937.42 676,206.05 70°17'46.074 N 148°34'23.111 W 9,319.34 89.79 322.10 8,891.18 148.38 -86.93 5,959,959.11 676,186.64 70°17'46.292 N 148°34'23.662 W 9,349.73 89.23 326.37 8,891.44 173.03 -104.69 5,959,983.33 676,168.31 70°17'46.534 N 148°34'24.180 W 88.25 330.93 8,892.16 200.91 -121.67 5,960,010.80 676,150.68 70°17'46.808 N 148°34'24.675 W 9,410.11 89.66 334.49 8,892.66 225.54 -134.38 5,960,035.12 676,137.40 70°17'47.051 N 148°34'25.045 W' 9,440.71 91.20 339.85 8,892.43 253.73 -146.25 5,960,063.03 676,124.87 70°17'47.328 N 148°34'25.391 W 9,476.04 91.14 344.39 8,891.71 287.33 -157.09 5,960,096.37 676,113.25 70°17'47.658 N 148°34'25.707 W 9,500.32 91.78 348.00 8,891.09 310.90 -162.88 5,960,119.79 676,106.90 70°17'47.890 N 148°34'25.876 W 9,531.36 90.49 352.97 8,890.48 341.50 -168.01 5,960,150.26 676,101.06 70°17'48.191 N 148°34'26.025 W 9,561.09 89.17 356.46 8,890.57 371.10 -170.74 5,960,179.78 676,097.63 70°17'48.482 N 148°34'26.105 W 9,590.35 88.16 359.13 8,891.25 400.32 -171.87 5,960,208.97 676,095.82 70°17'48.770 N 148°34'26.138 W 9,626.89 86.99 2.77 8,892.80 436.82 -171.27 5,960,245.47 676,095.57 70°17'49.129 N 148°34'26.120 W 9,654.40 87.45 0.54 8,894.13 464.28 -170.47 5,960,272.94 676,095.72 70°17'49.399 N 148°34'26.097 W 9,682.88 90.80 356.50 8,894.56 492.74 -171.21 5,960,301.37 676,094.31 70°17'49.679 N 148°34'26.119 W 9,716.94 91.20 352.81 8,893.97 526.64 -174.38 5,960,335.19 676,090.35 70°17'50.012 N 148°34'26.211 W 9,741.02 89.45 351.90 8,893.83 550.51 -177.58 5,960,358.97 676,086.59 70°17'50.247 N 148°34'26.305 W 9,770.67 87.61 349.29 8,894.59 579.74 -182.43 5,960,388.08 676,081.06 70°17'50.534 N 148°34'26.446 W 9,801.55 86.96 345.96 8,896.06 609.87 -189.03 5,960,418.04 676,073.75 70°17'50.831 N 148°34'26.639 W 9,830.25 87.94 343.39 8,897.33 637.52 -196.61 5,960,445.51 676,065.52 70°17'51.102 N 148°34'26.859 W 9,860.26 88.93 339.23 8,898.15 665.93 -206.22 5,960,473.68 676,055.25 70°17'51.382 N 148°34'27.140 W 9,891.26 87.91 336.06 8,899.01 694.58 -218.01 5,960,502.05 676,042.80 70°17'51.664 N 148°34'27.483 W 9,920.82 87.94 334.35 8,900.08 721.40 -230.40 5,960,528.57 676,029.78 70°17'51.927 N 148°34'27.844 W 9,951.73 92.61 336.15 8,899.93 749.46 -243.33 5,960,556.31 676,016.19 70°17'52.203 N 148°34'28.221 W 9,980.17 97.01 337.74 8,897.55 775.53 -254.43 5,960,582.11 676,004.49 70°17'52.460 N 148°34'28.545 W 10,010.41 101.45 340.21 8,892.70 803.38 -265.14 5,960,609.70 675,993.13 70°17'52.734 N 148°34'28.857 W 10,040.27 106.00 342.94 8,885.61 830.89 -274.31 5,960,636.99 675,983.32 70°17'53.004 N 148°34'29.124 W 10,080.24 108.22 348.83 8,873.84 867.91 -283.63 5,960,673.78 675,973.13 70°17'53.368 N 148°34'29.396 W 10,108.92 108.20 352.20 8,864.88 894.78 -288.12 5,960,700.53 675,968.01 70°17'53.633 N 148°34'29.527 W 10,140.88 108.94 357.82 8,854.69 924.94 -290.76 5,960,730.63 675,964.67 70°17'53.929 N 148°34'29.604 W 10,170.75 108.28 1.85 8,845.16 953.25 -290.84 5,960,758.92 675,963.93 70°17'54.208 N 148°34'29.606 W 7/19/2010 8:55.36AM Page 3 COMPASS 2003.16 Build 71 BAKER HUGHES Survey Report- Geographic ;} k HUGHES ' 1NTEQ .ry Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32BPB1 Survey Calculation Method: Minimum Curvature Design: 15-32BPB1 Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,240.00 108.28 1.85 8,823.44 1,018.97 -288.71 5,960,824.66 675,964.51 70°17'54.854 N 148°34'29.545 W TD • 7/19/2010 8:55:36AM Page 4 COMPASS 2003 16 Build 71 ■ r BAKER MOMS INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 15 15-32_DIMS - Slot 32 1976' SNL, 333' EWL, SEC 22, T11N, R14E UM 15-32B Survey: MWD Survey Report - Geographic 19 July, 2010 0 by • MAU BAKER HUGHES Survey Report-Geographic 0 bp LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5©70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 15,TR-11-14 Site Position: Northing: 5,958,837.36ft Latitude: 70°17'35.236 N From: Map Easting: 676,296.98ft Longitude: 148°34'21.213 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.34° Well 15-32_DIMS API No 500292246200 Well Position +N/-S 0.00 ft Northing: 5,959,812.81 ft Latitude: 70°17'44.833 N +E/-W 0.00 ft Easting: 676,277.02 ft Longitude: 148°34'21.128 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 31.00 ft Wellbore 15-32B API No 500292246202 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 7/12/2010 22.17 80.95 57,699 Design 15-32B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,050.07 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 39.50 0.00 0.00 351.64 Survey Program Date: 7/19/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 128.00 8,664.38 MWD(15-32PB1) MWD MWD-Standard 8,683.00 9,050.07 MWD(15-32BPB1) MWD MWD-Standard 9,080.14 11,624.00 MWD(15-32B) MWD MWD-Standard 7/19/2010 8:59:15AM Page 2 COMPASS 2003.16 Build 71 Kill BAKER HUGHES Survey Report- Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay TVD Reference: 70.5 i 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 i 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (1 (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 1 9,050.07 85.76 302.91 8,887.26 -9.37 128.99 5,959,806.47 676,406.18 70°17'44.740 N 148°34'17.369 W TIP/KOP 9,080.14 85.49 309.14 8,889.56 8.25 104.75 5,959,823.52 676,381.54 70°17'44.914 N 148°34'18.075 W 9,110.98 86.71 313.32 8,891.65 28.52 81.62 5,959,843.24 676,357.94 70°17'45.113 N 148°34'18.749 W 9,140.76 88.37 315.77 8,892.93 49.39 60.41 5,959,863.61 676,336.25 70°17'45.318 N 148°34'19.367 W 9,170.73 89.91 320.65 8,893.38 71.73 40.45 5,959,885.47 676,315.77 70°17 45.538 N 148°34'19.949 W 9,203.55 90.31 320.58 8,893.32 97.10 19.63 5,959,910.34 676,294.36 70°17'45.787 N 148°34'20.556 W 9,233.45 92.98 318.88 8,892.46 119.90 0.31 5,959,932.68 676,274.52 70°17'46.012 N 148°34'21.119 W 9,263.94 94.66 316.22 8,890.43 142.34 -20.22 5,959,954.63 676,253.47 70°17'46.232 N 148°34'21.718 W 9,296.04 93.25 313.46 8,888.22 164.92 -42.93 5,959,976.67 676,230.24 70°17'46.455 N 148°34'22.379 W 9,324.32 93.59 312.17 8,886.53 184.11 -63.63 5,959,995.36 676,209.09 70°17'46.643 N 148°34'22.983 W 9,350.23 94.20 317.00 8,884.77 202.25 -82.04 5,960,013.07 676,190.26 70°17'46.822 N 148°34'23.520 WI 9,380.29 93.32 322.78 8,882.79 225.18 -101.35 5,960,035.54 676,170.42 70°17'47.047 N 148°34'24.083 W 9,409.99 93.04 324.78 8,881.15 249.10 -118.88 5,960,059.04 676,152.34 70°17'47.282 N 148°34'24.593 W I 9,440.39 93.87 331.09 8,879.31 274.80 -134.98 5,960,084.36 676,135.64 70°17'47.535 N 148°34'25.063 W 9,470.48 91.96 332.02 8,877.78 301.22 -149.29 5,960,110.43 676,120.71 70°17'47.795 N 148°34'25.480 W I 9,499.10 88.86 334.75 8,877.58 326.80 -162.11 5,960,135.71 676,107.30 70°17'48.047 N 148°34'25.853 W 9,530.46 87.05 339.05 8,878.70 355.62 -174.40 5,960,164.23 676,094.34 70°17'48.330 N 148°34'26.212 W 9,560.47 87.48 340.85 8,880.13 383.78 -184.68 5,960,192.13 676,083.40 70°17'48.607 N 148°34'26.511 W 9,592.05 90.64 338.40 8,880.65 413.37 -195.67 5,960,221.46 676,071.72 70°17'48.898 N 148°34'26.832 W 9,624.27 92.33 335.53 8,879.81 443.01 -208.27 5,960,250.79 676,058.43 70°17'49.190 N 148°34'27.199 W 9,657.68 93.62 332.73 8,878.08 473.03 -222.83 5,960,280.46 676,043.17 70°17'49.485 N 148°34'27.623 W 9,687.66 91.90 330.03 8,876.63 499.31 -237.17 5,960,306.39 676,028.22 70°17'49.743 N 148°34'28.042 W 9,717.40 92.98 326.58 8,875.37 524.59 -252.78 5,960,331.30 676,012.02 70°17'49.992 N 148°34'28.496 W 9,755.29 92.39 327.32 8,873.59 556.31 -273.42 5,960,362.53 675,990.65 70°17'50.304 N 148°34'29.098 W 9,789.95 90.77 331.38 8,872.64 586.11 -291.08 5,960,391.90 675,972.30 70°17'50.597 N 148°34'29.613 W 9,815.61 92.76 335.46 8,871.85 609.04 -302.55 5,960,414.56 675,960.29 70°17'50.822 N 148°34'29.947 W 9,846.12 93.57 338.47 8,870.16 637.08 -314.47 5,960,442.30 675,947.72 70°17'51.098 N 148°34'30.295 W 9,878.92 92.34 343.10 8,868.47 668.00 -325.25 5,960,472.96 675,936.22 70°17'51.402 N 148°34'30.609 W 9,906.24 90.18 342.70 8,867.87 694.10 -333.28 5,960,498.86 675,927.58 70°17'51.659 N 148°34'30.843 W 9,936.08 91.66 346.31 8,867.39 722.85 -341.25 5,960,527.41 675,918.94 70°17'51.942 N 148°34'31.076 W 9,967.11 94.03 349.45 8,865.85 753.14 -347.75 5,960,557.55 675,911.72 70°17'52.240 N 148°34'31.265 W 9,995.81 94.30 353.41 8,863.76 781.44 -352.02 5,960,585.74 675,906.79 70°17'52.518 N 148°34'31.390 W 10,027.67 92.83 354.32 8,861.78 813.06 -355.42 5,960,617.26 675,902.66 70°17'52.829 N 148°34'31.489 W 10,055.80 95.19 359.35 8,859.81 841.06 -356.97 5,960,645.22 675,900.45 70°17'53.104 N 148°34'31.534 W 10,085.88 95.47 3.34 8,857.02 871.00 -356.26 5,960,675.16 675,900.45 70°17'53.399 N 148°34'31.513 W 10,114.48 92.36 4.99 8,855.07 899.45 -354.19 5,960,703.66 675,901.85 70°17'53.679 N 148°34'31.453 W 10,144.81 93.44 9.74 8,853.53 929.49 -350.31 5,960,733.77 675,905.03 70°17'53.974 N 148°34'31.340 W 10,168.43 94.08 11.98 8,851.98 952.63 -345.87 5,960,757.01 675,908.93 70°17'54.202 N 148°34'31.211 W 10 202.49 92.46 6.14 8,850.04 986.20 -340.52 5,960,790.69 675 913.49 70°17'54.532 N 148°34'31.055 W 10,232.41 95.05 8.47 8,848.08 1,015.80 -336.72 5,960,820.38 675,916.59 70°17'54.823 N 148°34'30.944 W 10,263.42 96.36 9.96 8,845.00 1,046.26 -331.78 5,960,850.94 675,920.81 70°17'55.122 N 148°34'30.800 W 10,290.76 95.35 4.14 8,842.20 1,073.24 -328.45 5,960,877.99 675,923.51 70°17'55.388 N 148°34'30.703 W 10,325.70 95.82 1.64 8,838.80 1,107.97 -326.69 5,960,912.74 675,924.45 70°17'55.729 N 148°34'30.652 W 10,350.31 96.82 1.32 8,836.09 1,132.42 -326.06 5,960,937.20 675,924.51 70°17'55.970 N 148°34'30.633 W 10,383.79 96.46 357.81 8,832.22 1,165.67 -326.32 5,960,970.43 675,923.48 70°17'56.297 N 148°34'30.641 W 10,410.77 93.50 357.33 8,829.88 1,192.52 -327.45 5,960,997.25 675,921.71 70°17'56.561 N 148°34'30.674 W 10,441.43 90.65 357.88 8,828.77 1,223.13 -328.73 5,961,027.82 675,919.71 70°17'56.862 N 148°34'30.711 W 10,493.58 88.62 0.89 8,829.10 1,275.27 -329.29 5,961,079.93 675,917.93 70°17'57.375 N 148°34'30.728 W 10,524.34 88.04 5.49 8,830.00 1,305.96 -327.58 5,961,110.65 675,918.92 70°17'57.677 N 148°34'30.678 W, 10,561.01 87.18 10.45 8,831.53 1,342.23 -322.51 5,961,147.03 675,923.14 70°17'58.033 N 148°34'30.530 W', 10,588.87 87.48 13.90 8,832.83 1,369.43 -316.64 5,961,174.35 675,928.37 70°17'58.301 N 148°34'30.359 W I 10,619.77 87.17 13.13 8,834.27 1,399.44 -309.42 5,961,204.52 675,934.88 70°17'58.596 N 148°34'30.149 W 10,647.74 89.51 8.73 8,835.08 1,426.88 -304.13 5,961,232.08 675,939.53 70°17'58.866 N 148°34'29.994 W 10,681.96 90.86 3.32 8,834.97 1,460.90 -300.54 5,961,266.17 675,942.32 70°17'59.200 N 148°34'29.890 W 7/19/2010 8:59:15AM Page 3 COMPASS 2003.16 Build 71 r Frill BAKER HUGHES Survey Report-Geographic 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 15-32_DIMS-Slot 32 Project: Prudhoe Bay ND Reference: 70.5 @ 70.50ft(70.5) Site: PB DS 15 MD Reference: 70.5 @ 70.50ft(70.5) Well: 15-32_DIMS North Reference: True Wellbore: 15-32B Survey Calculation Method: Minimum Curvature Design: 15-32B Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,709.18 90.37 3.43 8,834.68 1,488.07 -298.93 5,961,293.37 675,943.29 70°17'59.468 N 148°34'29.843 W 10,745.59 93.01 0.48 8,833.60 1,524.44 -297.69 5,961,329.75 675,943.68 70°17'59.825 N 148°34'29.807 W 10,775.81 93.04 357.91 8,832.01 1,554.61 -298.11 5,961,359.91 675,942.55 70°18'0.122 N 148°34'29.819 W 10,804.81 93.25 354.96 8,830.42 1,583.51 -299.92 5,961,388.75 675,940.07 70°18'0.406 N 148°34'29.872 W 10,833.13 92.73 352.02 8,828.94 1,611.60 -303.12 5,961,416.76 675,936.20 70°18'0.683 N 148°34'29.965 W 10,860.50 92.39 348.79 8,827.72 1,638.56 -307.68 5,961,443.60 675,931.02 70°18'0.948 N 148°34'30.098 W 10,890.82 93.77 345.14 8,826.09 1,668.05 -314.51 5,961,472.92 675,923.50 70°18'1.238 N 148°34'30.297 W 10,929.86 91.50 340.64 8,824.29 1,705.31 -325.98 5,961,509.90 675,911.16 70°18'1.604 N 148°34'30.632 W'. 10,954.21 92.36 337.34 8,823.47 1,728.03 -334.70 5,961,532.40 675,901.91 70°18'1.828 N 148°34'30.886 W' 10,980.95 92.00 339.24 8,822.45 1,752.85 -344.58 5,961,556.99 675,891.44 70°18'2.072 N 148°34'31.174 W' 11,012.11 89.85 341.97 8,821.95 1,782.23 -354.93 5,961,586.12 675,880.41 70°18'2.361 N 148°34'31.476 W 11,045.80 88.49 347.25 8,822.44 1,814.70 -363.87 .5,961,618.36 675,870.72 70°18'2.680 N 148°34'31.736 W 11,080.56 88.90 350.32 8,823.23 1,848.78 -370.62 5,961,652.28 675,863.16 70°18'3.015 N 148°34'31.933 W 11,108.82 89.23 354.04 8,823.69 1,876.77 -374.47 5,961,680.17 675,858.66 70°18'3.290 N 148°34'32.046 W 11,133.10 89.97 357.38 8,823.86 1,900.98 -376.28 5,961,704.32 675,856.28 70°18'3.528 N 148°34'32.099 W 11,165.33 90.92 1.22 8,823.61 1,933.20 -376.68 5,961,736.52 675,855.13 70°18'3.845 N 148°34'32.110 W, 11,193.47 91.38 4.62 8,823.05 1,961.29 -375.24 5,961,764.64 675,855.91 70°18'4.122 N 148°34'32.068 W 11,223.99 91.78 9.68 8,822.20 1,991.55 -371.45 5,961,794.98 675,858.99 70°18'4.419 N 148°34'31.958 W 11,266.84 90.61 10.32 8,821.31 2,033.74 -364.01 5,961,837.33 675,865.44 70°18'4.834 N 148°34'31.741 W!, 11,290.18 89.63 5.39 8,821.26 2,056.86 -360.82 5,961,860.51 675,868.08 70°18'5.062 N 148°34'31.648 W 11,317.14 92.74 0.84 8,820.70 2,083.76 -359.36 5,961,887.44 675,868.92 70°18'5.326 N 148°34'31.605 W 11,348.69 92.88 357.35 8,819.16 2,115.26 -359.85 5,961,918.92 675,867.68 70°18'5.636 N 148°34'31.620 W 11,362.93 91.57 354.72 8,818.60 2,129.46 -360.84 5,961,933.09 675,866.36 70°18'5.776 N 148°34'31.649 W 11,407.07 89.94 349.10 8,818.02 2,173.14 -367.05 5,961,976.60 675,859.13 70°18'6.205 N 148°34'31.830 W 11,439.91 89.14 353.64 8,818.29 2,205.59 -371.97 5,962,008.93 675,853.45 70°18'6.524 N 148°34'31.973 W 11,474.26 89.20 357.74 8,818.78 2,239.84 -374.55 5,962,043.10 675,850.06 70°18'6.861 N 148°34'32.049 W 11,506.26 91.38 4.89 8,818.62 2,271.80 -373.82 5,962,075.08 675,850.05 70°18'7.176 N 148°34'32.027 W I 11,532.92 91.78 8.30 8,817.89 2,298.27 -370.76 5,962,101.61 675,852.49 70°18'7.436 N 148°34'31.938 W'. 11,560.27 91.75 12.01 8,817.04 2,325.18 -365.94 5,962,128.62 675,856.67 70°18'7.700 N 148°34'31.798 W' 11,577.31 91.29 14.04 8,816.59 2,341.77 -362.10 5,962,145.30 675,860.12 70°18'7.864 N 148°34'31.686 W 11,624.00 91.29 14.04 8,815.54 2,387.06 -350.78 5,962,190.83 675,870.38 70°18'8.309 N 148°34'31.356 W TD-2-7/8" Casing Points Measured Vertical Casing Hole , Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,624.00 8,815.54 2-7/8" 2.875 4.125 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 9,050.07 8,887.26 -9.37 128.99 TIP/KOP 11,624.00 8,815.54 2,387.06 -350.78 TD Checked By: Approved By: Date: 7/19/2010 8:59:15AM Page 4 COMPASS 2003.16 Build 71 o_ m N O 1 • E E ° o O .-.- N .-^ , U L- v :W m m 2 232.41 o8 N o H L d III a Q L N R U ^ m my Y 3 L V J W W c c, uu U O� m a a`74 d` N 5 C 0 m T. 0 C ��tiV •,^.. Y g t i v° C�CD , ' a�a 000000000 m 5 a a;--- o • 00000000 �u 1. _ O ._ O Iv i x rcrt L Q51 a e ' o o ,.���.� Z , 1 oococo W W W W W W Z C.-00.000000 Q -,� 333333 I- ��333333 c — 222222 .wo,aaaea v Z 0 N N N w IA w m m C7 m 9994 aY�Qj N 'O 100.N 2 Q 4Q d F 0 m U 0°°°°° y 0 0....0 W j W 2 N 8 e Ol m . N E Z a A d J 1 N N W Y(j en a.CD c • _ m as 3- > (j •P tm9 C O tJp tJp eJ7 0 0 0 m ap(Tl 3 N . 0,000-i N O° Y O R O An 2-Q L m^ J J J 2,-1 Q iO.0 C a m000 in 203z W O '. • • STATE OT ALASKA SEAN PARNELL, GOVERNOR ALASKA 0114 AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15 -32B BP Exploration (Alaska), Inc. Permit No: 210 -062 Surface Location: 1676' FNL, 333' FWL, SEC. 22, T11N, R14E, UM Bottomhole Location: 676' FSL, 253' FEL, SEC. 16, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Jo'' •m.n ommissioner DATED this 2 of May, 2010. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/ o encl. (via e -mail) ALAS IL AND G STATE OF ALASKA AS CONSERVATION COMM ON e `� ` "' • PERMIT TO DRILL S- 4?-/to 20 AAC 25.005 MAY 1 4 2010 1 a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone 1c. ,Spe cify if well is ro ❑ Drill ®Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone tfla51tleti y ra es q ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp F ldlO rrIghale Gas 2. Operator Name: 5. Bond: Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 15-32B 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 11689' TVD 8754'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028306 1676' FNL, 333' FWL, SEC. 22, T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1941' FNL, 650' FWL, SEC. 22, T11N, R14E, UM June 10, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 676' FSL, 253' FEL, SEC. 16, T11N, R14E, UM 2560 21,700' ` 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 68.05' feet 15. Distance to Nearest Well Open Surface: x- 676277 y- 5959812 Zone- ASP4 GL Elevation above MSL: 33.3' feet to Same Pool: 600' 16. Deviated Wells: Kickoff Depth: 8700' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3250 Surface: 2370 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4 -1/8" 3 - 1/2" x 3/3 - 16" 9.3# / 6.2# L -80 STL / TCII 3020' 8580' 8484'ss 11600' 8756'ss 150 sx Class 'G' x 2 - 7/8" / 6.5# / STL 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11535' 8912' 10460' 11498' 8908' None Casing Length Size Cement Volume MD TVD Conductor / Structural 80' 20" 260 sx Arcticset (Approx.) 114' 114' Surface 3495' 13 -3/8" 1170 sx Permafrost 'E'. 375 sx Class 'G' 3530' 3529' Intermediate 8295' 9 -5/8" 610 sx Class 'G' 8327' 8319' • Production Liner 1484' 7" 280 sx Class 'G' 8165' - 9649' 8161' - 8851' Liner 948' 4 -1/2" Slotted Liner Cemented with 2 -3/8" Cmt Job 9417' - 10365' 8872' - 8848' Liner 2770' 2 -3/8" 221 sx Class 'G' 8765' - 11535' 8703' - 8912' Perforation Depth MD (ft): 9120' - 9400' (Above Plug) Perforation Depth TVD (ft): 8866' - 8873' 20. Attachments: ❑ Property Plat 0: BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report IN Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the oregoing is true and correct. Contact Sean McLaughlin, 564 -4387 Printed Name J ur r Air - n Title Engineering Team Leader ¢ ,,, Prepared By Name/Number: Signature , :�% Phone 564 -4711 Date j A.-/ / /(j Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Perm ' r at See cover letter for Number: ,�,2/00,6� 50- 029 - 22462- 02 -00 V other requirements Conditions of Approval: If box is check well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Other: 3 500 P S i� ( P e S / 1 S amples Req'd: ❑ es ' No Mud Log Req'd: ❑ es �No — ,5-00 p s` A.......4.... ( e 54 ` i) H Measures: ® Y • o Directional Survey Req'd: <Yes ❑ No n ��� APPROVED BY T HE COMMISSION Date �`2 -i �� , COMMISSIONER l Form 10-401 Revised 07/2009 This permit is valid for 24 months from the da o • • •val (20 AA 25.005(g)) Submit In Duplicate S /b' /o . ' p /yo BPXA Prudhoe Bay 15 -32B CTD Sidetrack May 11, 2010 b p CTD Sidetrack Summary Pre -Rig Work: (scheduled to begin June 1, 2010) 1. S Dummy GLV's 2. S Drift for 4 -1/2" X 7" Thru tubing whipstock to 8703' MD 3. S Caliper 7" liner 4. D MIT -IA - 3000 psi 5. E Set a- 1 /2 "CIBPat8715' 6. D MIT - Tubing 2000 psi 7. E Set whipstock at -8680' MD 8. W AC -LDS; AC- PPPOT- T ('4A 9. W PT tree (MV,SV,WV), 10. 0 Bleed gas lift and production flowlines down to zero and blind flange A 11. 0 Remove S- Riser, Remove wellhouse, level pad Rig Work: (scheduled to begin on June 10, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high 2. Mill 3.8" window at -8680' and 10' of rathole. • 3. Drill Build: 4.125" OH, 405' (38 deg /100 planned) 4. Drill Lateral: 4.125" OH, 2515' (12 deg /100 planned) 5. Run 3 -1/2" x 3- 3/16" x 2 -7/8" solid L -80 liner leaving TOL at 8580' ✓ 6. Pump primary cement leaving TOC at 8580', 31 bbls of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNL/GR /CCL log 'rh;5 8. Test liner lap to 2000 psi. ? 9. Perforate liner per asset instructions (-1400') 10. Freeze protect well, Set BPV, RDMO Post -Rig Work: 1. Re- install wellhouse and FL's. 2. Generic GLV's Mud Program: • Well kill: 8.4 ppg brine. • Milling /drilling: 8.6 ppg Geo -VIS for milling and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.125" (bi- center bits used) Casing Program: fully cemented liner • 3 -1/2 ", L -80 9.3# STL 8580' - 8630' and • 3- 3/16 ", L -80 6.2# TCII 8630' - 9200' and • 2 -7/8 ", L -80 6.5# STL 9200' - 11600' and • A minimum of 31 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 8580'. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 92 deg at 11,100. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest propene — 21700 ft. • • Distance to nearest well within pool — 600 ft. (15 -20C) Anti - Collision Failures • 15 -19A — 24 ft. ctr -ctr; Shut -in because of surface corrosion, plug set deep • 15 -20A — 50 ft ctr -ctr; P &A'd Logging • MWD directional and Gamma Ray will be run over all of the open hole section. • Cased hole MCNL/GR /CCL will be run. Hazards • The maximum recorded H2S level on DS15 is 40 ppm on well 15 -20C. • No fault crossings expected, calculated risk of lost circulation is low. Reservoir Pressure • The reservoir pressure on 15 -32B is expected to be 3,250 psi at 8,800' TVDSS. (7.1 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi /ft) to surface is 2,370 psi. Sean McLaughlin CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE = 4-1/16" CAN NELLHEAD = FMC L 11I I lw 1 J. •V LLL flfrVLL - I v `W iv 1,1 4CTUA TOR = BAKER 5 -32A ... DEPLOY SLV 4.! 8728' TALLY INDICATES) LM(77'HIGHER <B.,ELEV = 68.05' r14131111/11r 1 IUD I D A DTI A l 1*** 3F. ELEV = NA <OP= 8149' I I Max Angle = 98° @ 9585' 1 2008' 1 4 -1/2" X NIP 1D = 3.813" Datum MD = 9105' I 1 Datum TVD= 8800' SS ST1 V H PO RT DATE 120" CONDUCTOR, 91.5#, 14-40, 19.124" H 114' 4 3029 M0D 3028 TVD DE V TYPE VLV LATC MMG DAIfY RK 0 06/09!09 5031 5029 1 WAG DMY RK 0 06/09/09 113 -3/8" CSG, 68#, L -80, ID = 12.415" H 3530' 2 6861 6859 0 MMG 0 04/11/08 DMY RK 1 7981 7979 5 AAUG DMY RK 0 04/11/08 Minimum ID = 1.920" @ 8880' 2 -3/8" LINER PIN 1 1 1 8062' H4 -1/2" X NIP, ID = 3.813" 1 Z Z 8092' H9 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" 1 19 -5/8" X 7" TIEBACK SLV, ID =? H 8165' 1 r........--"--...1 8127' H4 -1/2" X NIP, ID = 3.813" 1 19 -5/8" X 7" TIW LTPw /LNR HGR, ID = 6.276" H 8173' 1- `E 1 9-5/8" CSG, 47 #, L -80 NSCC, ID = 8.681" H 8327' 1y • 1 4 -1/2" TBG, 12.6#, 13CR -80 VA TOP, H 8621' I- ' . 1 8621' J - 14 - 1/2" WLEG, ID = 3.958" 1 .0152 bpf, ID = 3.958" ►�� I 8703' hi 7' X 4 -1/2" BKR S -3 PKR, ID = 3.875" 1 1 7' LNR, 26#, L -80 X0 TO 13 -CR NSCC H 8665' 1 - ( 8708' 1- 14 -1/2" X 3 -1/2" XO, ID - 2.992 1 I I 1TOPOF2 -3/8" LNR 1--1 8728' ELM I 8728' ELM H2.70" BKR DEPLOY SLV, ID= 2.250" 1 1 8740' I -1 -1/2" OTIS X NIP, ID = 2.813" (BEHIND CT LNR) 1 3 -1/2" TBG, 9.2#, L -80 NSCT, -j 8768' r - I 8757' —13-1/2" PKR SWN NIP, ID = 2.76" (BEHIND CT LNR) I .0087 bpf, ID = 2.992" 8768' H3 -1/2" WLEG, ID = 2.992" (BEHIND CT LNR) 1 'TOP OF CEMENT H 8792' ■•• ►�i ♦• TOP OF 4-1/2" LNR H 9417' ■ •�• • !e 9417' H7" X 4-1/2" TW SS PKR, ID = 3.96" I �� ^� 9464' _1 14 -1/2" PORTED JT (41.55') BHND CT LNR 1 1 7" LNR, 26#, 13CR NSCC, .0383 bpf, ID = 6.276" I� 9649' 1--A X ;, . • • 1� 4 -1/2" LNR, 12.6 p ( ft l jy858" 10355' ∎ • , • • REF LOG: BHI MWDlGR ON 11/04/01 1 10460' H2-3/8" CIBP (05/12/09) 1 ANGLE AT TOP PERF: 83° © 9120' / / ` Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE ` PBTD --1 11498' 1- 9/16" 6 9120 - 9400 0 07/15/08 SLTD 9630 -10342 S 11/06/01 1- 11/16" 4 11000 -11100 C 11/08/01 1-11/16" 4 11150 - 11230 C 11/08/01 Al *yam 1-11/16" 4 11290 - 11440 C 11/08/01 -....� 12 -3/8" LNR, 4.7 #, L -80, STL, .0039 bpf, ID = 1.995" H 11535' 1 DATE REV BY CONIIIENTS DATE REV BY COMMENTS PRUDHOE BAY UNFT 04/28 /94 D9 ORIGINAL COMPLETION 06/03/09 TAR/TLH GBP SET (05/12/09) WELL: 15-32A 11/08/01 NORDIC 1 CTD SIDETRACK "A" 06/09/09 SWC/TLH GLV C/0 PERMIT No: 2011840 04/11/08 D16 RWO API No: 50- 029 - 22462 -01 1 04/15/08 KJB/SV GLV C/O SEC 22, T11 N, RI4E, 1676' FNL & 333' FWL 05/08/08 AJW/PJC DRLG DRAFT CORRECTIONS 08/05/08 DMS/TLH ADPERF (07/15/08) BP Exploration (Alaska) TREE= 4-1/16" CIW 32B v v = FMC 15 * * @ 8 728 ' E LM (37' HIGHER CTUATOR = BAKER C • 8 D EPLOVSLV 1 /16/01 TALLY INDICATES) * ** 7" <B, ELEV = 68.05' P mposed CTD si - - - -. I 4 0nm I KID /DADTIAI \ * ** 3F. ELEV = NA COP= 8149' il 1 Max Angle = 98• @ 9585' 2008' - 14 - 1/2" X NIP ID = 3.813" Datum MD= 9105' GAS LIFT MANDRELS Datum TVD = 8800' SS ST MD TV D DEV TYPE VLV LATCH PORT DATE 20" CONDUCTOR, 91.5#, H -40, 19.124" -I 114' , 4 3029 3028 1 M 1G DMY RK 0 06/09/09 5031 5029 1 MMG DMY RK 0 06/09/09 13 -3/8" CSG, 68#, L -80, ID = 12.415" - 3530' 2 6861 6859 0 IVIVIG DMY RK 0 04/11/08 1 7981 7979 5 WAG DMY RK 0 04/11/08 Minimum ID = 2.5" @ 8570' 8062' -14-1/2" X NIP, ID = 3.813" Bore of KB packer 111 8092' - 9 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" 8127' - 14 -1/2" X NIP, ID = 3.813" 9 -5/8" X 7" TIEBACK SLV, ID = ? H 8165' J----____ 9 -5/8" X 7" TW LTP w /LNR HGR, ID = 6.276" H 8173' 8570' H4-1/2" KB LTP 9 -5/8" CSG, 47 #, L -80 NSCC, ID = 8.681" H 8327' I--■ 8580' H3.7" BOTdply SLV 4-1/2" TBG, 12.6 #, 13CR - VAM TOP, --I 8621' r. 8580' - I TOC .0152 bpf, ID = 3.958" I TSGR 8,300' / 8621' H4- 1/2 "WLEG,ID= 3.958" I 7" LNR, 26#, L -80 XO TO 13 - NSCC -I 8665' $630 H3 -112 x 3.3!16 XO BCGL 8,645 ' ) f -9200 H3-3/16" x 2 -7i8" XO 14-1/2" x 7" WS H -8680 - I � 3 5 deg 11600' - Panned TO 0 8703' I X 4 -1/2" BKR S -3 PKR, ID = 3.875" 3 -112" CIBP I $715' 8708 - 14 -1/2" X 3 -1/2" XO, ID = 2.992" TOPOF2 -3/8" LNR 8728' ELM 8728' ELM -12. BKR DEPLOY SLV, ID= 2.250" 8740' H3 -1/2" OTIS X NIP, ID = 2.813" (BEHIND CT LNR) 3 -1/2" TBG, 9.2 #, L -80 NSCT, H 8768' ' 8757' H 3 -1/2" PKR SWN NIP, ID = 2.76" (BEHIND CT LNR) .0087 bpf, ID = 2.992" TOP OF CEMENT H 8792' it • •• 8768' ---13 WLEG, ID = 2.992" (BEHIND CT LNR) ►�♦ • • TOP OF 4 -112" LNR 9417' ►. . • •�• 0 ■ : .40 9417' HT' X4- 1 /2 "TW SS PKR, ID =3.96" 6: 9464' - -I4 - 1/2" PORTED JT (41.55') BHND CT LNR � � • 7" LNR, 26#, 13CR NSCC, .0383 bpf, ID = 6.276" H 9649' a ► • • • 4 -1/2" LNR, 12.6 #, L -80, .0152 bpf, ID = 3.958" 10365' ►�i t PERFORATION SUMMARY REF LOG: BHI MWD /GR ON 11/04/01 10460' H2 -3/8" CIBP (05/12/09) ANGLE AT TOP PERF: 83° ,.I 9120' / Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE PBTD H 11498' 1- 9/16" 6 9120 - 9400 0 07/15/08 SLTD 9630 - 10342 S 11/06/01 1- 11/16" 4 11000 - 11100 11/08/01 A 1-11/16" 4 11150 - 11230 11/08/01 ��� 1-11/16" 4 11290 - 11440 C 11/08/01 2 -3/8" LNR, 4.7 #, L -80, STL, .0039 bpf, ID = 1.995" H 11535' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/28/94 139 ORIGINAL COMPLETION 06/03/09 TAR/TLH CIBP SET (05/12/09) WELL: 15 -32A 11/08/01 NORDIC 1 CTD SIDETRACK "A" 06/09/09 SWC/TLH GLV C/O PERMIT No: 1011840 04/11/08 1316 RWO API No: 50- 029 - 22462 04/15/08 KJB /SV GLV C/O SEC 22, T11 N, R14E, 1676' FNL & 333' FVVL 05/08/08 AJW /PJC DRLG DRAFT CORRECTIONS 08/05/08 DMS /TLH ADPERF (07/15/08) BP Exploration (Alaska) - 0 Baker Hughes INTEQ aA ■ - p Baker Hughes INTEQ Planning Report HUGHES INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -32 - Slot 32 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 70.5 @ 70.50ft (70.5) Well: 15 -32 North Reference: True Wellbore: Plan 2, 15 -32B Survey Calculation Method: Minimum Curvature Design: Plan 2 Database: EDM 2003.16 Single User Db Survey Tool Program Date 5/11 /2010 From To (ft) (ft) Survey (Wellbore) Tool Name Description 128.00 8,664.38 MWD (15- 32PB1) MWD MWD - Standard 8,664.38 11,689.17 Plan 2 (Plan 2, 15 -32B) MWD MWD - Standard Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) (°) ( °) (ft) (ft) (ft) (ft) (ft) ( 1100ft) (ft) ( °) 8,664.38 34.34 120.54 8,553.94 - 157.64 126.96 5,959,658.20 676,407.63 0.00 - 191.56 0.00 TIP 8,680.00 35.55 120.15 8,566.74 - 162.16 134.68 5,959,653.87 676,415.45 7.88 - 198.45 -10.62 KOP 8,700.00 33.86 119.05 8,583.18 - 167.79 144.58 5,959,648.47 676,425.48 9.00 - 207.12 - 160.00 End of 9 Deg /100' DLS 8,763.02 18.05 75.15 8,640.14 - 173.90 169.73 5,959,642.95 676,450.77 38.00 - 221.46 - 148.04 4 8,800.00 26.79 45.47 8,674.40 - 166.55 181.27 5,959,650.57 676,462.13 38.00 - 218.50 -66.80 8,841.01 40.00 30.15 8,708.62 - 148.56 194.56 5,959,668.87 676,474.99 38.00 - 206.14 -39.19 5 8,900.00 51.04 2.50 8,750.30 - 108.75 205.22 5,959,708.92 676,484.72 38.00 - 172.38 -71.1 8,953.21 65.00 345.15 8,778.56 -64.31 199.89 5,959,753.21 676,478.35 38.00 - 128.80 -51.46 6 9,000.00 72.86 328.03 8,795.48 -24.53 182.48 5,959,792.57 676,460.01 38.00 -85.46 -67.09 9,085.17 90.00 300.15 8,808.38 32.92 122.50 5,959,848.59 676,398.71 38.00 -10.97 -60.88 End of 38 Deg /100' DLS 9,100.00 90.00 298.37 8,808.38 40.16 109.57 5,959,855.54 676,385.61 12.00 0.27 -90.00 9,200.00 90.00 286.37 8,808.38 78.15 17.26 5,959,891.35 676,292.44 12.00 67.54 -90.00 9,215.17 90.00 284.55 8,808.38 82.20 2.64 5,959,895.05 676,277.73 12.00 76.34 -90.00 8 9,300.00 90.00 294.73 8,808.38 110.67 -77.15 5,959,921.64 676,197.30 12.00 130.38 90.00 9,400.00 90.00 306.73 8,808.38 161.68 - 162.95 5,959,970.62 676,110.33 12.00 207.66 90.00 5/11/2010 10:26:59AM Page 3 COMPASS 2003.16 Build 71 1 0 by Baker Hughes INTEQ B R's . B aker Hughes INTEQ Planning Report HUGNES INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -32 - Slot 32 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MO Reference: 70.5 @ 70.50ft (70.5) Well: 15 -32 North Reference: True Welibore: Plan 2, 15 -32B Survey Calculation Method: Minimum Curvature Design: Plan 2 Database: EDM 2003.16 Single User Db Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) ( 1100ft) (ft) ( °) 9,500.00 90.00 318.73 8,808.38 229.41 - 236.27 5,960,036.60 676,035.45 12.00 296.38 90.0 9,539.17 90.00 323.43 8,808.38 259.87 - 260.87 5,960,066.48 676,010.14 12.00 333.43 90.0 9 9,600.00 90.38 330.72 8,808.17 310.90 - 293.92 5,960,116.72 675,975.91 12.00 392.68 87.00 9,700.00 90.99 342.71 8,806.97 402.58 - 333.38 5,960,207.44 675,934.31 12.00 492.32 87.02 9,800.00 91.56 354.69 8,804.74 500.44 - 352.93 5,960,304.80 675,912.47 12.00 590.97 87.17 9,839.17 91.76 359.39 8,803.60 539.53 - 354.95 5,960,343.83 675,909.54 12.00 628.39 87.44 10 9,900.00 91.88 352.09 8,801.67 600.12 - 359.46 5,960,404.30 675,903.61 12.00 686.87 -89.00 10,000.00 91.99 340.08 8,798.28 696.95 - 383.45 5,960,500.53 675,877.36 12.00 786.07 -89.23 10,039.17 92.02 335.38 8,796.91 733.17 - 398.28 5,960,536.39 675,861.68 12.00 825.17 -89.64 11 10,100.00 92.00 342.68 8,794.77 789.89 - 420.02 5,960,592.59 675,838.62 12.00 885.91 90.00 10,200.00 91.90 354.69 8,791.35 887.72 - 439.58 5,960,689.92 675,816.77 12.00 984.53 90.26 10,289.17 91.75 5.40 8,788.51 976.71 - 439.52 5,960,778.88 675,814.75 12.00 1,068.13 90.67 12 10,300.00 91.76 4.10 8,788.18 987.50 - 438.62 5,960,789.69 675,815.39 12.00 1,077.96 -89.540 10,400.00 91.81 352.09 8,785.05 1,087.21 - 441.94 5,960,889.29 675,809.73 12.00 1,172.80 -89.54 10,500.00 91.79 340.08 8,781.89 1,184.05 - 465.93 5,960,985.54 675,783.48 12.00 1,272.00 -89.92 10,519.17 91.78 337.78 8,781.29 1,201.93 - 472.81 5,961,003.25 675,776.18 12.00 1,291.16 -90.29 13 10,600.00 91.75 347.49 8,778.79 1,278.95 - 496.90 5,961,079.67 675,750.29 12.00 1,371.77 90.00 10,700.00 91.65 359.49 8,775.81 1,378.08 - 508.21 5,961,178.50 675,736.66 12.00 1,468.79 90.30 10,789.17 91.50 10.20 8,773.34 1,466.76 - 500.70 5,961,267.34 675,742.09 12.00 1,549.56 90.66 14 10,800.00 91.50 8.90 8,773.06 1,477.44 - 498.90 5,961,278.05 675,743.64 12.00 1,558.97 -90.00 10,900.00 91.46 356.89 8,770.46 1,577.10 - 493.86 5,961,377.79 675,746.34 12.00 1,650.90 -90.03 11,000.00 91.36 344.89 8,767.99 1,675.63 - 509.66 5,961,475.92 675,728.23 12.00 1,748.89 -90.35 5/11/2010 10:26:59AM Page 4 COMPASS 2003.16 Build 71 0 bP Baker Hughes INTEQ R HU ■ B aker Hughes INTEQ Planning Report HUGHES INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -32 - Slot 32 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 15 MD Reference: 70.5 @ 70.50ft (70.5) Well: 15 -32 North Reference: True Wellbore: Plan 2, 15-32B Survey Calculation Method: Minimum Curvature Design: Plan 2 Database: EDM 2003.16 Single User Db Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) ( ° /100ft) (ft) (°) 11,039.17 91.30 340.19 8,767.08 1,712.97 - 521.41 5,961,512.97 675,715.61 12.00 1,788.00 -90.64 15 • 11,100.00 91.29 347.49 8,765.71 1,771.34 - 538.33 5,961,570.93 675,697.33 12.00 1,848.64 90.00 11,200.00 91.23 359.49 8,763.50 1,870.49 - 549.64 5,961,669.78 675,683.69 12.00 1,945.68 90.17 11,289.17 91.13 10.19 8,761.66 1,959.19 - 542.13 5,961,758.63 675,689.13 12.00 2,026.46 90.43 16 11,300.00 91.13 8.89 8,761.45 1,969.87 - 540.33 5,961,769.35 675,690.67 12.00 2,035.88 -90.00 11,400.00 91.10 356.89 8,759.50 2,069.54 - 535.30 5,961,869.10 675,693.37 12.00 2,127.82 -90.03 11,500.00 91.02 344.89 8,757.65 2,168.08 - 551.10 5,961,967.24 675,675.26 12.00 2,225.82 -90.26 11,539.17 90.98 340.19 8,756.97 2,205.43 - 562.85 5,962,004.30 675,662.64 12.00 2,264.93 -90.48 17 11,600.00 91.22 347.49 8,755.80 2,263.81 - 579.77 5,962,062.26 675,644.36 12.00 2,325.58 88.00 11,689.17 91.55 358.18 8,753.64 2,352.13 - 590.87 5,962,150.29 675,631.18 12.00 2,412.37 88.14 TD at 11689.17 III 5/11/2010 10:26:59AM Page 5 COMPASS 2003.16 Build 71 Project: Prudhoe Bay Magnefc eram xs.2e' WELLBORE DETAILS: Plan 2, 15 REFERENCE INFORMATION EMI 0 Site: PB DS 15 Magnetic Fiala Parent Wellbore: 15 -32PB1 Cooranate(N /E)Relerence: We1115-32- Slot 32,Tme North BAKER Well: 15 -32 stre apAn9u 6094 VSe Mean Sea level W ellbore: Plan 2, 15-32B I:ipAngle:13091 Tie on MD: 8664.38 Secfion (VS)Reference: slot -32(O.WN, OOOE) HVV//►► 13 p Da 4/15/201C M Plan:Pl Well: 1 15 - 32/Plan 2, 15 Moael�eGGM2005 Measured Depth Reference: 70.5 Calculatlon Method: Minimum Curvature 1 NTEQ _... r _._.__..__. 3000 WELL DETAILS: 15 -32 ' 2750 Ground Level: 0.00 +N / -S 10-W Northing Easting Latittude Longitude Slot 15 -32/P 2,l5. -32B 0.00 0.00 5959812.81 676277.02 70° 17' 44.833 N 148° 34' 21.128 W 32 2500 SECTION DETAILS ANNOTATIONS 2250 TD at 11689.1 - 13- a 2 Blar eta Sec MD Inc Azi ssTVD +NI -S +EI -W DLeg TFace VSec 2000 1 8664.38 34.34 120.54 8553.94 - 157.64 126.96 0.00 0.00 - 191.56 TIP 2 8680.00 35.55 120.15 8566.74 - 162.16 134.68 7.88 -10.62 - 198.45 KOP 7 3 8700.00 33.86 119.05 8583.18 -167.79 144.58 9.00 200.00 -207.12 End of 9 Deg/100' DLS q'1750 4 8763.02 18.05 75.15 8640.14 - 173.90 169.73 38.00 - 148.04 - 221.46 4 4 16 5 8841.01 40.00 30.15 8708.62 - 148.56 194.56 38.00 -66.80 - 206.14 5 0 1500 - 15 3213 target 2 6 8953.21 65.00 345.15 8778.56 -64.31 199.89 38.00 -71.11 - 128.80 6 ■n 15 7 9085.17 90.00 300.15 8808.38 32.92 122.50 38.00 67.09 -10.97 End of 38 Deg/100' DLS ` • 8 9215.17 90.00 284.55 8808.38 82.20 2.64 12.00 270.00 76.34 8 , 1 111 9 9539.17 90.00 323.43 8808.38 259.87 - 260.87 12.00 90.00 333.43 9 + 14 10 9839.17 91.76 359.39 8803.60 539.53 - 354.95 12.00 87.00 628.39 10? 1000_ 13 / 11 10039.17 92.02 335.38 8796.91 733.17 - 398.28 12.00 271.00 825.17 11 0 : 12 10289,17 91.75 5.40 8788.51 976.71 - 439.52 12.00 90.00 1068.13 12 750 12 13 10519.17 91.78 337.78 8781.29 1201.93 - 472.81 12.00 270.50 1291.16 13 Ead of31 Deg/1( 0' DLS 14 10789.17 91.50 10.20 8773.34 1466.76 - 500.70 12.00 90.00 1549.56 14 500 I1 - 15 11039.17 91.30 340.19 8767.08 1712.97 - 521.41 12.00 270.00 1788.00 15 16 11289.17 91.13 10.19 8761.66 1959.19 - 542.13 12.00 90.00 2026.46 16 V3 to 17 11539.17 90.98 340.19 8756.97 2205.43 - 562.85 12.00 270.00 2264.93 17 250 18 11689.17 91.55 358.18 8753.64 2352.13 - 590.87 12.00 88.00 2412.37 TO at 11689.17 0 11-32B get 1 9 ,.... - 5 40, - - 4 -250 6.. t _ -IS- 32/15 -32PE1 l - TIP 1 5 32/1. - 32A -500 / KO' En. of9Drg/I00CLS _ 15- 32/11 -32 -2250 -2000 -1750 -1500 -1250 -1000 -750 -500 -250 0 250 500 750 1000 1250 1500 1750 2000 2250 West( - )/East( +) (250 ft/in) ■ .■■■■.■■■■■■■■■ ■■■ ■■■■■■■■■■■■■.■■ 8471 ^ 8541 i 1 GPE■■ 8 611 .■■■ ■■■.■■■..■■■■.■.■■.■■■■■■■■.■■■ 0 FA, i� 9DeP/ WD • O 8681 ■■. ■.■■■■■.■■■.■..■■■.■.■■■■.■■■.. 5 -32B .■■�2`5 -321 A ‘0,,,. 8751 'I -:■■■.■� ■■ :............� ..... Fr - - - -- 8891 numm m■ isimE ■■�■■ immisi.■■.■■■■.■scing 9.17 g96 mom! i■ ■■■.■■■■■■■■■.■.■■.■■■■■■.■..■■ E. 9031 ®MJ ..■■■ .■■■■..■■.■■.■■■■■.■■■■■■■■. v 9104 i■■■■■■ ■■■..■■■■.■■.■■.■...■.i■■■■...■■■ ' rn 9171 ■■■.■■■■ ■..■■■■..■■■■■■■■■■.■■ ... IIIIIIMMINIIIIIIIIIIIIIIIIIIIIMMMMIMIMIIIIHIIIIIIIIIIMMMIMIIIOIIIIIIIIIIIIIIMIIIIBMIIIIMIMMIIMIIIIEIIIMMIMIIMMIMIIIIIIMIIIMIIIIIIIIIIIMMMIIIIMIIMMM a' 2 -210 - 140 - 0 70 140 210 280 350 420 490 5611 630 700 770 840 910 980 1050 1120 1190 1260 1330 1413 1470 1540 1610 1680 1750 1820 1890 1960 2030 2100 2170 2240 2310 2380 2450 Vertical Section at 340.00° (70 ft/in) Project: Prudhoe Bay M� ..T. WELLBORE DETAILS: Plan 2, 15 -32B REFERENCE INFO MATION Site: PB DS 15 Coordinate (WE) Reference. We111S32 - Sbt 32, True NoM a rdq�e 22 2 Parent Wellbore: 15 -32PB1 BAKER Well: 15-32 veim5lest zs,T Tie on MD: 8664.38 VedcaI (TVD) Reference: 70.5 @ 70.508 IN 0 bp (70.5) HUGHES Wellbore: Plan 2, 15 -326 Dwaqu. aosa° Section (VS) Reference: Slot - 32(O.OW,O.00E) P lan: Plan 2 (15-32/Plan 2, 15-32B) , a Measured Depth Reference: 70.5 @ 70.508 (70.5) i Imo' TEQ Cakulatbn Method. Minimum 3311 • A 1•�� ► 15 - - 27 . _.MIt _ ... . s2 �� �I�:.Ir7������� 1 1 106106 , n 15 26/6B ■ ■■ ■ l . ) ■■� i ■n. 1:08 ■■ �: i1 1 o 'i� 1 0 °p c ' . 2, 1 -3 : B 1 I 1 zzso ' ', IiIIIII • 1951 ■I■■■■■iIi %„-, ■�11 ■■ ■■ ■1101 15-0; i pl" I 1 PB 1,, 1 116s -19 19 ■ • 1 1 3 5 IQ iri _ iiiii - ii. ■r■■ ■1E111ik\ iiii■11 ■■11i ■I■■ ■■■■■_ 1351 \� `I \ y I 1211 ��'1 � \ r�1051 t ■■i■■o1■ L■i ■isilis 0 911 11. 06A/ 5- outon5 -0 ii osim I ur 75, ■ ■ ■ ■ ■ ■i!!;!1ll l e swi iiii i \ ► ■■■■�! ■ \..m 611 ■ ■• ■ ■ ■iiii ■alp 1 gi ii l kin r ■ ■■ : 11 :: 11 �Ii ill 45, ■ S ■ ■ p Il ■■■■■III■■■ .� k 11■ 1■ ;. „ 10:24.....trialmmaimum. 15 ■\,' ■ ■ ■■i122,210 211 ■■■ 1M■�' ■ ■■ ■■ ■ ■iV!■■■ ■■!!►�! INIMM:! ■11■ \111∎10 ■■ ■ ■ ■ ■ii■ ■ ■■Eiil /iii iii :.,° ■ ∎■`'=' 3 ' i ■■ !,�i�ir ■ %iii111 ■ ■ /'ii ■�:i i�fi ' i �!► rii ■■ _45, iiii'l ' ■■■111E�'�IIIP %■Il■■' ' %''it _ ■ \■ -,,, ■ ■IIME % LI II ' ■ a �� I ■.,11' ■ ■�l : i i \■■' , \ 15- 9/15 -39A 70.5 @ 70. '� ERIIR . RI Anal®al�FMI IIIIMr 7 1 11INrft . 1 2 � Lk ' ����i111ai il•� / 7 1 .. ... .... .. .. .. . -2850 -27W -2550 -2400 -2250 -2100 -1950 -1800 -1650 - 1500 - -1350 -1200 -1050 -900 - 750 -600 -450 -300 -150 0 150 300 450 600 750 900 1050 1200 1350 1500 1650 1800 1950 2100 2250 2400 2550 2700 West( -) /East( +) (150 ft/in) Project: Prudhoe Bay ANTI - COLLISION SETTINGS COMPANY DETAILS. Horn Amon. - ALASKA - BP NORTNAHERICA r.' C) Sit Well e: : 1 15 -32 DS 15 ALAS BAKER Interpolation Method: 8664.38 50.00 by Depth Range From: 8664.38 To 11689.78 alculanonMaud ISCWSA . HUGHES Results Limited By: Centre Distance: 1365.03 e System ISCWSA Wellbore: Plan 2, 15.328 Reference: Plan: Plan 2 (15- 32/Plan 2, 15-32B) Error SSu. Euwinal onI NOnn Plan: Plan 2 (1532/PIan2,15 -32B) V.v.l.an. RVl..eaw4 INT'EQ WELL DETAILS: 1532 Ground Level: - -� 0.00 +NIS +0141 Northing Easing LaBdude Longitude Slot From Colour To MD 0.00 0.00 5959812.81 676277.02 70 °17'44.833N 148 °34'21.128W 32 SECTION DUALS 19 9 3800 71 90 Sac MD Inc M ND 051.5 +E/ -W Dies TFacce VSec Target - / 1 8664 3434 120.54 8624.44 -157.64 126.96 coo 0.00 - 191.56 . . 2 86600 35.55 720.15 863724 162.16 134.68 788 1062 19845 3 8700 3386 11905 865368 -16779 74458 900 20.0 207.12 04 1 ` 1 4 8763.02 18.05 75.15 871064 -173.0 16973 3800 -148 -66 22146 1$4 81 ..1 128 6 895331 65 0 345.15 884906 84. • _ %/� 168 \ 0 0 0 7 9085.17 9000 3075 887888 32.92 122.50 3800 870 70.97 \ 8 9215.17 . 284.55 8878.88 82.20 264 1200 270. 28.34 9 9539.17 90 00 323.43 8878.88 259.87 -29 87 12 0 0.0 333.43 70 9839.17 91 76 359.39 8874.70 53983 36485 1200 9700 628 39 \ 17 103917 9202 335.38 88 733.77 3928 72.00 27700 825.17 12 10289 17 91.75 5.40 885907 976.71 439.52 1200 9000 7068.13 .4 - 152 13 7019.17 91.78 337.76 8851.79 51.79 1201.93 472.81 1200 27050 7291.16 - - \ 14 10789 17 91 51 1020 084384 1466 76 60.70 12 00 90.0 154956 - \ 15 11039 17 91.30 340.19 8837.58 171297 6 0 0 21.47 1200 270 1788. ' \ \ \ 9 0 16 11289.17 91.13 7019 883276 195919 642.13 12.00 00 202846 136 - \ 126 \ ` 17 11539 17 .98 340.79 882747 2205.43 b62.85 1200 270 2260.93 • 18 7169 6 17 91.55 358.78 8824.14 2352.13 08 0 7 1200 88 2472.37 1.64, . 104 SURVEY PROGRAM $$ \ \ \‘\10 \\\Date: 2010- 05-11700MA) Validated: Yes Version: Depth From Depth To Survey /Plan Tool 72- 1 128.00 8664.38 MWD (15- 32PB1) MWD M D / 4.38 11689.17 PIan2 PIan2 15 -328 W 866 ( ) / / t• .1`` S LEGEND � llrrar�,, \\\\\,\\\\\\\\ 114 � �����a�� II ,, � . \ \ \ \ \` \ \Q� \ \ nn1,,,,, \,,,�1•..7, �: sue ,S ,53z V, NIII�II���ii��������� 1,11-?i ,, \\ \ \ \ \ \ \ \ \ \ \ �, ��������� ►� III 3 y / ° „0 �K +1saz 1s0aA 15-324,0 Awo I� i! 7 Irl ��� 1 t • .1 .1. surer s32PB, vt ����������� ) �iii���Illllllilllllf�� IIIIIIillllilll� ► ������i�.: ��i����IIIIIIIIiII. III IIIINIIIIIillllll► ��i111111111 �� ►►�i 4I4011� ,1.14 271 r'• nllq ��. Y 1 t 'llllil�i Illilllilllliill r m z 7 ►�u�����►�►[�Ill)uID \ +, �ti� IIIII�III .,54, so,a,S�,a�e 1� �� +157 onn4 tw,,smw I III IIII � II ���� � 1so1 ows sou +smAVB • . 1402, 15-07.131.15-02.131V6 n \� t �, c' r � ..MO;ISOM.15L2aWO. .1.2. 15-02.131,, �� 502131. V10 • -. � - � A. aoz ,smePez. umerez vv ' �IT' -• 4..1 - - - . ism so3 ,6-m v, la 1544 15-04 15-06 VI . 1 .64. 5044 V4 80 +,SO6PP esaawBt,sa ae, - % 4..: • s mc , tsaecv6 ////////////////// 4 1.4 , \\` \ 9$ j • MO. 520,1540a4 V2 240 r 1 120 + M. x20415.204 V6 . 112 _. 7 •.16-2015m0re1. x20.13, V6 j + ISM 152013, ,5.209 V5 - _- / s1524 1520415 -LIB .51 V6 .. 6-24 5 128 1 1 S20C V2 � , +s2 to ,522 v, .e __ - . • , s24 1523n. iSZSn w •"'�• ` \ ` - 144 ° +'�.� 15- 32/15 -32 .-,5s4. ,524.,5s4VI _ � ,� .,S241S241S2a VI \ \ „_� _ �/ _ .,S 1S268,1S25A V3 \ _ . 1S241SZ6B 1SZ60 V5 tso 15-32/1 5 32P \ 1 76 _ - .1427,15-27, 1, 1527 4 \ \ \ _, _ � 32/15 - . IS . 1 5 . 38 VI ISM. - ' + ,534153 rsl VI 1 `� 192 150 r t 341 153/345-81 0 21 -15.38. 15-34 1538 VI ♦ 15341538015390 V4 r M. 15-304.15-390.070 V. 1547 1547 16-47 V, - - + 1544 1544 154a V1 180 + 1544 15444,154442 Travelling CylinderAzimuth (TFO +AZI) [ °] vs Centre to Centre Separation [16 ft/in] .. '' V4 TANI • BPPASSPORT 0 Was Travelling Cylinder Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 15 -32 - Slot 32 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 15 MD Reference: 70.5 @ 70.50ft (70.5) Site Error: 0.00ft North Reference: True Reference Well: 15 -32 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 2, 15 -32B Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan 2 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB DS 15 15 -01 - 15 -01 - 15 -01 Out of range 15 -01 - 15 -01A - 15 -01A Out of range 15 -01 - 15-01B - 15-01B 10,575.00 12,470.00 825.83 152.75 673.06 Pass - Major Risk 15 -01 - 15-01B - 15-018 wp04 Extension 10,250.00 12,375.00 865.95 345.47 520.70 Pass - Major Risk 15 -02 - 15 -02 - 15 -02 Out of range 15 -02 - 15 -02A - 15 -02A Out of range 15 -02 - 15- 02APB1 - 15- 02APB1 Out of range 15 -02 - 15 -02B - 15 -02B Out of range 15 -02 - 15 -02B - 15 -028 wp10 Out of range 15 -02 - 15- 02BPB1 - 15- 02BPB1 Out of range 15 -02 - 15- 02BPB2 - 15- 02BPB2 Out of range 15 -03 - 15 -03 - 15 -03 9,765.71 9,225.00 1,328.03 115.81 1,224.91 Pass - Major Risk 15 -06 - 15 -06 - 15 -06 Out of range 15 -06A - 15 -06A - 15 -06A 11,600.00 10,450.00 1,056.20 466.35 589.88 Pass - Major Risk 15- 06APB1 - 15- 06APB1 - 15- 06APB1 11,175.00 10,660.00 1,158.03 418.11 740.81 Pass - Major Risk 15 -08 - 15 -08C - 15 -08C Out of range 15 -19 -15 -19 - 15 -19 10,710.85 8,850.00 514.60 119.46 398.64 Pass - Major Risk 15 -19 - 15 -19A - 15 -19A 11,334.42 9,700.00 24.48 153.45 - 102.56 FAIL - Major Risk 15 -20 - 15 -20 - 15 -20 8,975.39 8,875.00 1,021.37 163.62 858.06 Pass - Major Risk 15 -20 - 15 -20A - 15 -20A 10,194.36 10,600.00 39.66 211.93 - 162.08 FAIL - Major Risk 15 -20 - 15- 20APB1 - 15- 20APB1 8,980.00 8,819.00 1,008.49 164.82 844.45 Pass - Major Risk 15 -20 - 15 -20B - 15 -208 8,830.00 9,300.00 438.76 170.13 274.32 Pass - Major Risk 15 -20 - 15 -20B - 15 -20B Wp 5.1 8,824.56 9,275.00 425.88 170.90 258.97 Pass - Major Risk 15 -20 - 15 -20C - 15 -20C 10,950.00 10,600.00 676.04 259.48 416.56 Pass - Major Risk 15 -23 - 15 -23 - 15 -23 Out of range 15 -23 - 15 -23A - 15 -23A Out of range 15 -24 - 15 -24 - 15 -24 8,690.26 8,575.00 993.45 79.46 920.34 Pass - Major Risk 15 -26 - 15 -26 - 15 -26 10,225.00 8,625.00 700.83 137.24 589.08 Pass - Major Risk 15 -26 - 15 -26A - 15 -26A 10,225.00 8,625.00 700.83 137.24 589.08 Pass - Major Risk 15 -26 - 15 -26B - 15 -26B 10,231.34 8,625.00 701.43 136.00 589.85 Pass - Major Risk 15 -27 - 15 -27 - 15 -27 11,689.78 8,400.00 726.99 185.81 643.27 Pass - Major Risk 15 -32 - 15 -32 - 15 -32 8,675.00 8,675.00 0.00 1.11 -0.82 FAIL - Major Risk 15 -32 - 15 -32A - 15 -32A 8,677.45 8,675.00 0.00 1.19 -0.86 FAIL - Major Risk 15 -32 - 15 -32PB1 - 15 -32PB1 8,675.00 8,675.00 0.00 0.94 -0.64 FAIL - Major Risk 15 -38 - 15 -38 - 15 -38 Out of range 15 -38 - 15 -38A - 15 -38A Out of range 15 -38 - 15 -38A - Plan #3 Out of range 15 -38 - 15- 38APB1 - 15- 38APB1 Out of range 15 -39 - 15 -39 - 15 -39 9,065.94 8,625.00 726.11 52.36 675.88 Pass - Major Risk 15 -39 - 15 -39A - 15 -39A 8,860.00 8,575.00 843.93 51.23 797.56 Pass - Major Risk 15 -39 - 15 -39A - 15 -39A wp 7.0 8,880.00 8,675.00 919.52 56.04 866.81 Pass - Major Risk 15-47 - 15-47 - 15 -47 Out of range 15-48 - 15 -48 - 15 -48 9,675.00 8,700.00 855.12 74.08 783.85 Pass - Major Risk 15-48 - 15 -48A - 15 -48A 9,675.00 8,700.00 855.12 74.09 783.85 Pass - Major Risk 15-48 - 15 -48B - 15 -48B 9,675.00 8,700.00 855.12 74.09 783.85 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1 5/11/2010 9:33:03AM Page 3 of 52 COMPASS 2003.16 Build 71 • • All Measurements are from top of Riser 5/11/2010 i a) CC 15-32B top of bag r- BAG 7 1/16" 5000 psi. bttm of bag J middle of slips I Blind /Shears I I TOTs middle of pipes 2 -3/8" combi ram /slips 7 1/16" 5000psi I I Mud Cross Mud Cross middle of flow cross 7 1 /16" 5000psi 1 I variable bore pipe 3 1/2 " -2 3/8" middle of blind /shears I I TOTs middle of pipe /slips 2 -3/8" combi ram /slips 71/16" 5000psi I I e 1 Swab Valve . i I I Flow Tee Alaska Department of Natural esources Land Administration System • Page 1 of/2 Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28306 8 Printable Case File Summary See Township, Range, Section and Acreage? New Search ® Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28306 mat' Search for Status Plat Updates As of 05/17/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 16 Section Acres: 640 Meridian: U Township: 011N Range: 014E Section: 21 Section Acres: 640 Meridian: U Township: O11N Range: 014E Section: 22 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14-127 11N 14E UM 15,16,21,22 2560.00 U- 3- 7 End of Case Summary Last updated on 05/17/2010. http: / /dnr. alaska.gov /prof ects /1as /Case_Summary.cfm ?FileType= ADL &FileNumber =2830... 5/17/2010 • • TRANSMITTAL LETTER CHECKLIST WELL NAME PXi/ /5 ? PTD# o? /doh Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: : „XI/ POOL: , l ,,ec%'I4*2 ./7.o)/ -C] /G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 ❑ Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 15-32B Program DEV Well bore seg ❑ PTD#: 2100620 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / PEND Geo Area 8890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes X 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 5/17/2010 1 13 Can permit be approved before 15 -day wait Yes • 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA 1 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j,2.A -D) NA 18 Conductor string provided NA Conductor set in DS15 -32A Engineering 19 Surface casing protects all known USDWs NA Surface casing set in DS15 -32A 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented in DS15 -32A 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in DS15 -32A 22 CMT will cover all known productive horizons Yes Tapered cemented liner is planned. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10-403 for abandonment been approved Yes 310 -153 126 Adequate wellbore separation proposed Yes Proximity analysis performed. Fails major risk with 15 -19 ( plug set ) and 15-20 ( P & A'd) 27 If diverter required, does it meet regulations NA Wellhead in place. BOP installed on top of tree. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 3250 psi (7.1 ppg EMW) Will drill with 8.6 ppgmud_ GLS 5/18/2010 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 2370 psi Will test BOP to 3500 psi • 31 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on DS 15. Rig Ri has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S was 40ppm for well 15-20C. Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 5/17/2010 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA J Geologic Engineering -blic Commissioner: Date: Commissioner: �` -Date J // sioner Date 0 Z7 - /) , ‘..2,4 l Well History File APPENDIX Info'illation of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 10/10/26 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 10/07/12 3252947 01 3" CTK *** LIS COMMENT RECORD *** IIII I IIIIIIIIIIIII Remark File Version 1.000 II III 1111IIIII1111 Extract File: ldwg.las —Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8318.5000: Starting Depth STOP.FT 11624.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 15-32B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 17' 21.128"N 148 deg 34' 21.128"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 15 Jul 2010 API . API NUMBER: 500292246202 —Parameter Information Block #MNEM.UNIT Value Description SECT. 22 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . DF Log Measured from FAPD.F 70.50 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 70.50 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 afo —060 00uo r tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 16 Jul 2010 per Jennifer Flight with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from 15-32 through a milled window in a 7 inch liner. Top of window 8687 ft.MD (8572.4 ft.TVDSS) Bottom of window 8694 ft.MD (8577.8 ft.TVDSS) (9) Tied to 15-32 at 8664 feet MD (8553.9 feet TVDSS) . (10) Baker Hughes INTEQ runs 4 through 7 were used to drill 15-32BPB1. (11) Tied into 15-32BPB1 at 9050 ft. MD (8816.8 ft. TVDSS) . (12) The interval from 11587 ft to 11624 ft MD (8745.9 ft. to 8745.0 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8322.99, 8323.6, ! 0.615234 8325.04, 8325.04, ! 0 8327.71, 8328.74, ! 1.02637 8333.66, 8335. 51, ! 1.84766 8341.05, 8342.9, ! 1.84668 8349.06, 8351.31, ! 2.25781 8350.9, 8353.16, ! 2.25781 8351.93, 8354.6, ! 2.66797 8354.8, 8357.27, ! 2.46289 8359.73, 8361.58, ! 1.84766 8362.4, 8362.81, ! 0.411133 8363.83, 8364.65, ! 0.820312 8365.07, 8365.89, ! 0.820312 8366. 5, 8367.53, ! 1.02637 8369.38, 8369.79, ! 0.411133 8375. 53, 8376.35, ! 0.820312 8384.36, 8384.56, ! 0.206055 8385. 59, 8386.62, ! 1.02539 8386.82, 8387.85, ! 1.02637 8391.13, 8391.95, ! 0.821289 8392.98, 8394.01, ! 1.02637 8396.26, 8397.7, ! 1.43652 8402.22, 8402.83, ! 0.616211 8409. 52, 8409.93, ! 0.410156 8413.01, 8413.63, ! 0.615234 8415.48, 8415.68, ! 0.205078 8419.17, 8420.61, ! 1.43652 8428.03, 8430.7, ! 2.66797 8444.04, 8446.09, ! 2.05176 Page 2 tapescan.txt 8448.35, 8450.81, ! 2.46387 8450.81, 8452.86, ! 2.05176 8459.64, 8459.43, ! -0.205078 8468.05, 8468.26, ! 0.205078 8684.86, 8683.42, ! -1.43652 8692.66, 8691.84, ! -0.821289 8693.48, 8693.48, ! 0 8694.71, 8695.33, ! 0.615234 8707.44, 8707.64, ! 0.205078 8722.42, 8722.01, ! -0.410156 8725.91, 8725.09, ! -0.821289 8729.4, 8729.4, ! 0 8730.63, 8731.45, ! 0.821289 8736.38, 8736.79, ! 0.411133 8744.8, 8745.41, ! 0.615234 8747.87, 8747.87, ! 0 8761.83, 8762.45, ! 0.615234 8772.28, 8771.86, ! -0.411133 8775.35, 8775.76, ! 0.411133 8781.72, 8781.92, ! 0.205078 8787.46, 8787.46, ! 0 8792.6, 8793.01, ! 0.410156 8798.61, 8799.84, ! 1.23145 8804.36, 8806.21, ! 1.84766 8812.98, 8812.78, ! -0.205078 8815.03, 8815.44, ! 0.410156 8817.29, 8817.5, ! 0.205078 8819.55, 8819.75, ! 0.205078 8833.3, 8834.74, ! 1.43652 8836.79, 8838.02, ! 1.23145 8844.18, 8844.38, ! 0.205078 8857.73, 8858.55, ! 0.821289 8864.71, 8865.32, ! 0.616211 8871.33, 8871.75, ! 0.411133 8875.64, 8877.08, ! 1.43652 8881.19, 8882.42, ! 1.23145 8888.58, 8889.4, ! 0.820312 8893.71, 8893.71, ! 0 8901.71, 8903.97, ! 2.25781 8903.97, 8905.82, ! 1.84766 8908.69, 8909.72, ! 1.02637 8909.1, 8911.36, ! 2.25684 8911.77, 8913.82, ! 2.05273 8914.23, 8916.7, ! 2.46289 8920.01, 8922.48, ! 2.46289 8923.91, 8925.96, ! 2.05273 8931.51, 8932.12, ! 0.615234 8934.38, 8936.43, ! 2.05273 8945.67, 8946.7, ! 1.02637 8950.63, 8951.86, ! 1.23145 8955.96, 8957.81, ! 1.84766 8959.66, 8960.89, ! 1.23145 8962.94, 8963.97, ! 1.02637 8966.23, 8967.05, ! 0.821289 8970.95, 8971.77, ! 0.821289 8973.21, 8973.82, ! 0.616211 8975.67, 8976.49, ! 0.821289 8976.9, 8978. 54, ! 1.64258 8979.77, 8980.6, ! 0.821289 8983.67, 8983.26, ! -0.410156 8996.79, 8997.61, ! 0.820312 9003.97, 9004. 59, ! 0.616211 9007.05, 9007.46, . 0.410156 Page 3 tapescan.txt 9010.95, 9011.15, ! 0.205078 9017.31, 9018. 54, ! 1.23145 9020.18, 9021.01, ! 0.821289 9024.91, 9025.32, ! 0.411133 9035.29, 9036.11, ! 0.820312 9050.07, 9049.66, ! -0.411133 9058.49, 9058.28, ! -0.205078 9061.97, 9061.77, ! -0.205078 9072.1, 9072.3, ! 0.206055 9137.9, 9139.34, ! 1.43652 9169.45, 9171.92, ! 2.46289 9179.51, 9181.56, ! 2.05273 9212.92, 9214.56, ! 1.6416 9235.53, 9237.38, ! 1.84668 9248.87, 9250.72, ! 1.84766 9256.88, 9257.7, ! 0.821289 9273.27, 9274.3, ! 1.02539 9289.28, 9290.1, ! 0.820312 9292.57, 9293.8, ! 1.23145 9297.9, 9297.49, . -0.410156 9303.65, 9305.09, ! 1.43652 9307.84, 9309.49, ! 1.64258 9313.18, 9314.62, ! 1.43652 9331.04, 9332.89, ! 1.84668 9336.17, 9337.61, ! 1.43652 9356.11, 9355.7, ! -0.410156 9359.6, 9358. 58, ! -1.02539 9365.03, 9365.64, ! 0.615234 9369.96, 9369.34, ! -0.616211 9372.42, 9371.19, ! -1.23145 9375.7, 9374.88, ! -0.821289 9385.55, 9384.94, ! -0.616211 9421.51, 9420.48, ! -1.02637 9438.31, 9437.49, ! -0.821289 9447.14, 9446.32, ! -0.820312 9462.94, 9461.71, ! -1.23145 9471.36, 9469.1, ! -2.25684 9474.44, 9472.38, ! -2.05273 9477.7, 9476.26, ! -1.43652 9483.24, 9482.21, ! -1.02637 9485.7, 9485. 5, ! -0.205078 9490.63, 9491.04, ! 0.411133 9493. 5, 9492.68, ! -0.821289 9499.9, 9500.1, ! 0.205078 9505.44, 9505.23, ! -0.205078 9517.75, 9518.37, ! 0.615234 9521.65, 9522.48, ! 0.821289 9530.69, 9528.84, ! -1.84668 9539.1, 9538.49, ! -0.616211 9545.05, 9543, ! -2.05273 9577.34, 9574.47, ! -2.87305 9598.11, 9596.67, ! -1.43652 9606.11, 9603.44, ! -2.66797 9609.81, 9608.37, ! -1.4375 9613.71, 9612.07, ! -1.6416 9617.61, 9616.99, ! -0.615234 9624.79, 9624.38, ! -0.411133 9634.23, 9631.97, ! -2.25781 9640.98, 9639.34, ! -1.64258 9647.96, 9648.37, ! 0.410156 9657.4, 9659.25, ! 1.84766 9660.07, 9661.71, ! 1.6416 9662. 53, 9663.97, ! 1.43652 Page 4 tapescan.txt 9665, 9666.43, ! 1.43652 9683.65, 9684.27, ! 0.616211 9686.93, 9687.14, ! 0.205078 9690.63, 9690.42, ! -0.205078 9696.38, 9695. 55, ! -0.820312 9699.66, 9700.07, ! 0.411133 9703.76, 9703.76, ! 0 9706.2, 9707.02, ! 0.821289 9754.32, 9753.71, ! -0.616211 9760.69, 9760.07, ! -0.615234 9766.64, 9766.02, ! -0.615234 9768.9, 9768.49, ! -0.410156 9771.77, 9770.54, ! -1.23145 9777.31, 9778.34, ! 1.02637 9780.01, 9782.07, ! 2.05273 9785. 55, 9786.79, ! 1.23145 9794.17, 9795.61, ! 1.43652 9807. 52, 9807.93, ! 0.410156 9814.91, 9814.7, ! -0.205078 9820.04, 9820.45, ! 0.410156 9838.63, 9837.81, ! -0.820312 9849. 51, 9846.23, ! -3.28418 9856.7, 9854.44, ! -2.25781 9862.65, 9861.01, ! -1.6416 9872.68, 9871.86, ! -0.821289 9876.99, 9875.14, ! -1.84766 9887.87, 9888.28, ! 0.411133 9892.59, 9892.59, ! 0 9897.93, 9897.11, ! -0.820312 9900.8, 9901.01, ! 0.205078 9902.24, 9902.85, ! 0.616211 9910.83, 9909.6, ! -1.23242 9918.26, 9915.18, ! -3.0791 9923.59, 9921.13, ! -2.46289 9929.13, 9929.96, ! 0.821289 9939.13, 9939.96, ! 0.821289 9941.6, 9943.85, ! 2.25781 9956.38, 9957.61, ! 1.23145 9964.17, 9964.79, ! 0.616211 9969.72, 9971.15, ! 1.43652 9974.68, 9974.68, ! 0 9979.4, 9980.01, ! 0.616211 9982.68, 9984.12, ! 1.43652 9991.39, 9991.6, ! 0.205078 9996.93, 9997.34, ! 0.410156 10005.6, 10005.1, ! -0.411133 10013.4, 10011.7, ! -1.6416 10017, 10015.6, ! -1.4375 10035.1, 10035.7, ! 0.615234 10040.9, 10042.1, ! 1.23145 10045.6, 10046.6, ! 1.02637 10051.7, 10052.1, ! 0.410156 10058.5, 10058.1, ! -0.410156 10064.5, 10065.1, ! 0.615234 10073.3, 10073.7, ! 0.410156 10080.7, 10080.1, ! -0.615234 10089.7, 10089.7, ! 0 10104.4, 10104.8, ! 0.410156 10133.4, 10135.2, ! 1.84766 10176.2, 10179.5, ! 3.28418 10194.6, 10198.1, ! 3.48926 10204.1, 10207.3, ! 3.2832 10230.9, 10230.5, ! -0.410156 Page 5 tapescan.txt 10234.2, 10233.8, ! -0.410156 10242.6, 10240.2, ! -2.46289 10256, 10253.9, ! -2.05273 10278, 10278.2, ! 0.205078 10281.7, 10281.2, ! -0.410156 10284.7, 10283.5, ! -1.23145 10295.4, 10293.1, ! -2.25781 10303.6, 10302.4, ! -1.23145 10310.6, 10310.4, ! -0.206055 10319.6, 10319.2, ! -0.410156 10322.5, 10320.7, ! -1.84766 10325, 10322. 5, ! -2.46289 10332, 10331.1, ! -0.821289 10343.9, 10342.6, ! -1.23145 10350.6, 10348.6, ! -2.05176 10353.5, 10351, ! -2.46289 10356, 10354.9, ! -1.02637 10359.2, 10358, ! -1.23145 10362.7, 10361.3, ! -1.43652 10370.5, 10368.9, ! -1.64258 10377.8, 10376.1, ! -1.64258 10386.8, 10385.1, ! -1.64258 10395.6, 10393.4, ! -2.25781 10403.4, 10401.8, ! -1.6416 10409.8, 10407.9, ! -1.84766 10413.9, 10411.7, ! -2.25781 10421.1, 10419, ! -2.05176 10445.1, 10442.1, ! -3.07812 10449.9, 10447.6, ! -2.25781 10452.5, 10449.9, ! -2.66895 10463.6, 10463.4, ! -0.205078 10487.7, 10487, ! -0.615234 10494, 10494.2, ! 0.205078 10496.3, 10496.5, ! 0.205078 10503.1, 10502.9, ! -0.205078 10510, 10509.6, ! -0.411133 10520.2, 10520.2, ! 0 10530.3, 10529, ! -1.23145 10534.8, 10536, ! 1.23145 10542.6, 10541.8, ! -0.821289 10544.8, 10543.7, ! -1.02637 10552.6, 10551.7, ! -0.821289 10556.7, 10555.8, ! -0.821289 10560.6, 10561.2, ! 0.615234 10565.5, 10564.9, ! -0.616211 10566.9, 10566.7, ! -0.205078 10581.1, 10582.1, ! 1.02637 10588.5, 10588.5, ! 0 10594.6, 10594.6, ! 0 10600.4, 10600.8, ! 0.411133 10607.5, 10608.2, ! 0.615234 10613.9, 10614.1, ! 0.205078 10621.1, 10622.1, ! 1.02637 10624.2, 10625.2, ! 1.02637 10627, 10628.1, ! 1.02637 10665, 10665.8, ! 0.821289 10667.7, 10668.1, ! 0.411133 10675.1, 10676.5, ! 1.4375 10682.1, 10681.7, ! -0.410156 10696.9, 10696.3, ! -0.615234 10730.4, 10728.7, ! -1.6416 10737.1, 10735.9, ! -1.23145 10761.2, 10760.1, ! -1.02637 Page 6 tapescan.txt 10779.5, 10776.4, ! -3.0791 10786, 10783.1, ! -2.87402 10793, 10790.6, ! -2.46289 10795.9, 10793.9, ! -2.05273 10800.4, 10799.6, ! -0.821289 10821.2, 10818.7, ! -2.46289 10825.4, 10822.9, ! -2.46289 10834.6, 10831.8, ! -2.87305 10838.5, 10836.1, ! -2.46289 10850.8, 10850.4, ! -0.411133 10888, 10885.9, ! -2.05273 10897.2, 10892.9, ! -4.31055 10904, 10899.2, ! -4.7207 10927.7, 10925.4, ! -2.25781 10934.4, 10932, ! -2.46289 10952.9, 10952.7, ! -0.205078 10960.1, 10959.5, ! -0.615234 10962.4, 10961.8, ! -0.615234 10966.1, 10965. 5, ! -0.616211 11016.5, 11015.9, ! -0.616211 11021.3, 11020.9, ! -0.410156 11027.5, 11027.8, ! 0.205078 11037.8, 11037.4, ! -0.411133 11039, 11038.8, ! -0.205078 11043.1, 11043.8, ! 0.616211 11047.5, 11047.3, ! -0.205078 11051.8, 11051.6, ! -0.205078 11055.1, 11055.5, ! 0.410156 11058.6, 11058.6, ! 0 11098.4, 11097.4, ! -1.02637 11107.7, 11105.8, ! -1.84668 11133.1, 11129.5, ! -3.69434 11137.3, 11133.4, ! -3.90039 11139.3, 11135.2, ! -4.10547 11145.1, 11143.6, ! -1.4375 11198.3, 11192.9, ! -5.33691 11201.2, 11195.8, ! -5.33594 11206.4, 11201.9, ! -4.51562 11219.1, 11213.4, ! -5.74805 11225.3, 11218.9, ! -6.36328 11239.6, 11233.6, ! -5.95215 11248.4, 11242.7, ! -5.74707 11254.4, 11248, ! -6.3623 11261.2, 11254.4, ! -6.77344 11273. 5, 11266.1, ! -7.38965 11280.9, 11272.5, ! -8.41504 11285.2, 11276.8, ! -8.41504 11300, 11291.6, ! -8.41504 11315, 11305.6, ! -9.44238 11321, 11311.7, ! -9.23633 11338, 11333.1, ! -4.92676 11353.2, 11347.3, ! -5.95215 11379.8, 11375.9, ! -3.90039 11389.7, 11386.6, ! -3.0791 11428.6, 11425.8, ! -2.87305 11436.4, 11435, . -1.43652 11444.4, 11441.8, ! -2.66797 11450.2, 11446.9, ! -3.28418 11460.7, 11456.6, ! -4.10449 11467.7, 11465.6, ! -2.05273 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Page 7 tapescan.txt Tape Subfile: 1 413 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** 1111111 ! ! I1111111 ! ! Remark File version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 16 Jul 2010 per Jennifer Flight with BP Exploration (Alaska) , Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 79 Tape File Start Depth = 8318.500000 Tape File End Depth = 11622.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Page 8 tapescan.txt Tape Subfile: 2 88 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** 11 ! MMIIIIIIIMMIIIMM Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 158 Tape File Start Depth = 8318.000000 Tape File End Depth = 11624.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 167 records. . . Minimum record length: 54 bytes Page 9 tapescan.txt Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 10/07/12 3252947 01 **** REEL TRAILER **** MWD 10/10/26 BHI 01 Tape subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8318. 5000 -999.2500 -999.2500 8319.0000 -999.2500 -999.2500 11622.0000 -999.2500 120.0000 Tape File Start Depth = 8318.500000 Tape File End Depth = 11622.000000 Tape File Level spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP 8318.0000 -999.2500 -999.2500 8318.2500 -999.2500 -999.2500 11624.0000 -999.2500 120.0000 Tape File Start Depth = 8318.000000 Tape File End Depth = 11624.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Page 10 I tapescan.txt Tape subfile 4 is type: CIS Page 11 tapescan.txt **** REEL HEADER **** MWD 11/02/15 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 10/07/09 3252947 01 3" CTK *** LIS COMMENT RECORD *** 1111111111111111111 Remark File Version 1.000 111111111 11 1111111 Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 8318.5000: Starting Depth STOP.FT 10240.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 15-32BPB1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 17' 44.833"N 148 deg 34' 21.128"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 09 Jul 2010 API . API NUMBER: 500292246271 -Parameter Information Block #MNEM.UNIT Value Description SECT. 22 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . DF Log Measured from FAPD.F 70.50 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 70.50 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 aro —o(a aoaiis tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to 109 this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by well 15-32B above the kick off point of 9049 feet MD dated 15 Jul 2010 per Jennifer Flight with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from 15-32 through a milled window in a 7 inch liner. Top of window 8687 ft.MD (8572.4 ft.TvDSS) Bottom of window 8694 ft.MD (8577.8 ft.TVDSS) (9) Tied to 15-32 at 8664 feet MD (8553.9 feet TVDSS) . - (10) The interval from 10204 ft to 10240 ft MD (8764.2 ft. to 8752.9 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8322.99, 8323.6, ! 0.615234 8325.04, 8325.04, ! 0 8327.71, 8328.74, ! 1.02637 8329.17, 8330.81, ! 1.6416 8333.66, 8335.51, ! 1.84766 8335.53, 8337.79, ! 2.25781 8341.05, 8342.9, ! 1.84668 8344.56, 8346.41, ! 1.84766 8349.06, 8351.31, ! 2.25781 8350.9, 8353.16, ! 2.25781 8351.93, 8354.6, ! 2.66797 8354.8, 8357.27, ! 2.46289 8359.73, 8361.58, ! 1.84766 8362.4, 8362.81, ! 0.411133 8363.83, 8364.65, ! 0.820312 8365.07, 8365.89, ! 0.820312 8366.5, 8367.53, . 1.02637 8369.38, 8369.79, ! 0.411133 8371.45, 8372.07, ! 0.616211 8374.32, 8375.14, ! 0.820312 8375.53, 8376.35, ! 0.820312 8384.36, 8384. 56, ! 0.206055 8385.59, 8386.62, ! 1.02539 8386.82, 8387.85, ! 1.02637 8391.13, 8391.95, ! 0.821289 8392.98, 8394.01, ! 1.02637 8396.26, 8397.7, ! 1.43652 8402.22, 8402.83, ! 0.616211 8406.14, 8406.75, ! 0.616211 8409.52, 8409.93, . 0.410156 Page 2 tapescan.txt 8413.01, 8413.63, ! 0.615234 8415.48, 8415.68, ! 0.205078 8419.17, 8420.61, ! 1.43652 8428.03, 8430.7, ! 2.66797 8444.04, 8446.09, ! 2.05176 8448.35, 8450.81, ! 2.46387 8450.81, 8452.86, ! 2.05176 8459.64, 8459.43, ! -0.205078 8468.05, 8468.26, ! 0.205078 8682.89, 8682.48, ! -0.410156 8690.89, 8690.69, ! -0.205078 8692.33, 8693.56, ! 1.23145 8695.61, 8697.05, ! 1.4375 8698.08, 8699.51, ! 1.4375 8699.72, 8701.36, ! 1.6416 8706.7, 8707.72, ! 1.02637 8709. 59, 8710.62, ! 1.02637 8712.88, 8713.9, ! 1.02637 8716.37, 8716.98, ! 0.616211 8719.63, 8719.83, ! 0.206055 8722.71, 8723. 53, ! 0.821289 8726.4, 8726.81, ! 0.411133 8728.45, 8729.07, ! 0.616211 8729.69, 8731.33, ! 1.64258 8731.94, 8733.38, ! 1.43652 8734, 8735.64, ! 1.6416 8736.25, 8737.69, ! 1.43652 8742.21, 8743.64, ! 1.43652 8746.54, 8747. 56, ! 1.02637 8761.11, 8762. 55, ! 1.43652 8771.29, 8771.91, ! 0.615234 8774.37, 8775.81, ! 1.4375 8777.24, 8779.09, ! 1.84668 8780.53, 8781.96, ! 1.43652 8788.33, 8789.56, ! 1.23145 8789.76, 8791, ! 1.23145 8793.25, 8794.9, ! 1.6416 8798.59, 8801.05, ! 2.46289 8801.87, 8804.34, ! 2.46387 8804.75, 8807.21, ! 2.46289 8808.03, 8809.47, ! 1.43652 8813.98, 8815.42, ! 1.43652 8816.24, 8817.68, ! 1.43652 8818.5, 8819. 53, ! 1.02637 8820.71, 8822.35, ! 1.6416 8832.41, 8834.87, ! 2.46289 8835.28, 8837.54, ! 2.25781 8840.41, 8842.06, ! 1.64258 8842.47, 8843.9, ! 1.43652 8844.24, 8845.26, ! 1.02637 8847.19, 8848.42, ! 1.23145 8855.81, 8856.83, ! 1.02637 8862.17, 8862.99, ! 0.821289 8864.43, 8864.84, ! 0.411133 8865.86, 8866.69, ! 0.821289 8871.2, 8871.82, ! 0.616211 8875.51, 8876.95, ! 1.43652 8881.46, 8882.29, ! 0.821289 8888.03, 8889.47, ! 1.43652 8893.38, 8893. 58, ! 0.205078 8896.25, 8896.87, ! 0.615234 8901.79, 8904.05, ! 2.25781 8904.05, 8906.1, ! 2.05176 Page 3 tapescan.txt 8905.69, 8907.54, ! 1.84766 8907.13, 8908.57, ! 1.4375 8909.18, 8911.03, ! 1.84766 8911.44, 8913.9, ! 2.46289 8914.11, 8916.78, ! 2.66895 8916. 57, 8918.62, ! 2.05176 8920.06, 8922.32, ! 2.25781 8923.96, 8926.01, ! 2.05273 8926.22, 8928.27, ! 2.05273 8931.14, 8931.96, ! 0.821289 8933.61, 8935.04, ! 1.4375 8934.63, 8936.48, ! 1.84766 8938. 57, 8940.21, ! 1.6416 8945.54, 8946.98, ! 1.43652 8950.47, 8951.91, ! 1.43652 8954.78, 8956.42, ! 1.6416 8955.81, 8958.07, ! 2.25781 8959. 5, 8960.53, ! 1.02637 8962.99, 8963.81, ! 0.821289 8966.28, 8967.1, ! 0.820312 8971, 8971.82, ! 0.821289 8973.05, 8973.46, ! 0.410156 8975.31, 8975.92, ! 0.615234 8976.95, 8978.18, ! 1.23145 8979.62, 8980.44, ! 0.821289 8983.11, 8983.52, ! 0.410156 8989.26, 8989.47, ! 0.205078 8996.45, 8997.06, ! 0.616211 9001.09, 9001.7, ! 0.616211 9003.96, 9004.58, ! 0.616211 9007.04, 9007.04, ! 0 9011.14, 9011.55, ! 0.411133 9017.71, 9018.12, ! 0.410156 9020.38, 9020.59, ! 0.206055 9023.05, 9023.25, ! 0.205078 9029.65, 9030.47, ! 0.821289 9034.13, 9035.57, ! 1.4375 9036.22, 9037.86, ! 1.6416 9044.22, 9046.48, . 2.25781 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 202 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** Remark File Version 1.000 The data presented here is final and has been depth shifted to a Page 4 tapescan.txt Primary Depth Control (PDC) log provided well 15-32B above the Kick off Point of 9049 feet MD dated 15 Jul 2010 per Jennifer Flight with BP Exploration (Alask * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 46 Tape File Start Depth = 8318.500000 Tape File End Depth = 10242.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 2 55 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** 1111111111111111111 Remark File Version 1.000 This file contains the raw-unedited field MWD data. Page 5 tapescan.txt * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 92 Tape File Start Depth = 8318.000000 Tape File End Depth = 10240.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 101 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 10/07/09 3252947 01 **** REEL TRAILER **** MWD 11/02/15 BHI 01 Page 6 } tapescan.txt Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8318.5000 -999.2500 -999.2500 8319.0000 -999.2500 -999.2500 10242.5000 -999.2500 123.7000 Tape File start Depth = 8318.500000 Tape File End Depth = 10242.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP 8318.0000 -999.2500 -999.2500 8318.2500 -999.2500 -999.2500 10240.0000 -999.2500 123.7000 Tape File start Depth = 8318.000000 Tape File End Depth = 10240.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 7