Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-081 • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 0.,O 3 - OS j Well History File Identifier Organizing(done) ❑ Two-sided II UIIII1I III II III ❑ Rescan Needed II II IIU 111111 • RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: reyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: (Maria) Date: 'pL J 1p ,3 /s/ P Project Proofing 11111111111111H BY: Maria Date: )4,. I3 /s/ (Y1f Scanning Preparation 7 x 30 = Q 10 + a 7 = TOTAL PAGES D..3 7 (Count does not include cover sheet) BY: Date: • 3 /s/ IA 6• Production Scanning 111111111111111 Stage 1 Page Count from Scanned File.4•O (Count does include covers et) Page Count Matches Number in Scanning Preparation: YES NO /BY: Date: / (p 113 /s/ rvp Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 11311111111111 ReScanned I IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked 111111111 fill 12/22/2011 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 9/23/2013 Permit to Drill 2030810 Well Name/No. REDOUBT UNIT 4A Operator COOK INLET ENERGY,LLC API No. 50-733-20506-01-00 MD 18091 TVD 12476 Completion Date 7/17/2003 Completion Status 1-GAS Current Status 1-GAS UIC No REQUIRED INFORMATION Mud Log No Samples No Directional Surv: Yes DATA INFORMATION / Types Electric or Other Logs Run: DRHO GR ALI ILD CNS PEF RHOB (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 22950 Digital Data l 17523 14701 5/16/2013 Electronic Data Set,Filename:Main Pass_AIT_TLD_MCFL_CNL_033PUP.las ED C 22950 Digital Data 15252 14686 5/16/2013 Electronic Data Set,Filename: Repeat SectionAIT TLD MCFL CNL 035PUP.las ED C 22950 Digital Data■ 5/16/2013 Electronic File:CD1_DATA_CIE_Files.htm ED C 22950 Digital Data- 5/16/2013 Electronic File:ru4a_dirsurvey.csv ED C 22950 Digital Data/ 5/16/2013 Electronic File: ru4a_dirsurvey.prn ' ED C 22950 Digital Data' 5/16/2013 Electronic File: ru4a_dirsurvey.txt ED C 22950 Digital Data" 5/16/2013 Electronic File:RU4_4A.pdf ED C 22950 Digital Data ' 5/16/2013 Electronic File:Caliper Combined.PDS ED C 22950 Digital Data 5/16/2013 Electronic File:TCOMCombined.PDS ED C 22950 Digital Data / 5/16/2013 Electronic File:TCOMCombined.PDS.FMA ED C 22950 Digital Data 5/16/2013 Electronic File: • i SO#10627759RU4A_Combined.PDS ED C 22950 Digital Data7 5/16/2013 Electronic File: SO#10627759 RU4A_Combined.PDS.FMA ED C 22950 Digital Data 5/16/2013 Electronic File: Downlog_US I_SONIC_028LDP.DLI S – ED C 22950 Digital Data / 5/16/2013 Electronic File: Main Pass USI SONIC 037PUP.DLIS ED C 22950 Digital Data/ 5/16/2013 Electronic File: Repeat_USI_SONIC_039PUP.DLIS ED C 22950 Digital Data ‘ 5/16/2013 Electronic File: SO#10627758RedoubtUnit4A Combined.PDS ■ AOGCC Page 1 of 2 Monday,September 23,2013 DATA SUBMITTAL COMPLIANCE REPORT 9/23/2013 Permit to Drill 2030810 Well Name/No. REDOUBT UNIT 4A Operator COOK INLET ENERGY,LLC API No. 50-733-20506-01-00 MD 18091 TVD 12476 Completion Date 7/17/2003 Completion Status 1-GAS Current Status 1-GAS UIC No Log 22950 Log Header Scans 0 0 2030810 REDOUBT UNIT 4A LOG HEADERS Rpt 22950 Mud Log 2 14820 18092 Open 5/16/2013 Formation Mud Log x4 14820-18092 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Co nts Cuttings 14820 18091 1375 • INFORMATION RECEIVED '' // Completion Report Directional/Inclination Data 2- Mud Logs, Image Files, Digital Data Y NA Core Chips 4--F4A Production Test Information la NA Mechanical Integrity Test Information Y 0 Composite Logs,Image, Data FilesnY Core Photographs Y/NAB Geologic Markers/Tops 0 Daily Operations Summary Cuttings Samples Q./NA Laboratory Analyses 6.J NA COMPLIANCE HISTORY Completion Date: 7/17/2003 Release Date: 8/17/2005 Description Date Comments • Comments: Compliance Reviewed By: \11--lp Date: ),--,7 ._r )--)4 V l AOGCC Page 2 of 2 Monday,September 23,2013 STATE OF ALASKA ` AKA OIL AND GAS CONSERVATION COM ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a.Well Status: Oil❑ Gas 0 • SPLUG❑ Other ❑ Abandoned ❑ Suspended❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 - Exploratory❑ GINJ ❑ WINJ❑ WAG❑ WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 5.Date Comp.,S �9i� ?003 J�12.Permit to Drill Number: " COOK INLET ENERGY,LLC • Aband.: 203-081 • 3.Address: 6.Date Spudded: 13.API Number: 601 W 5TH AVE#310 ANCHORAGE,ALASKA 99501 5/3/2003 50-733-20506-01 , 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 1910'FSL,314'FEL SEC 14 TO7N,R14W,SM 6/14/2003 • REDOUBT UNIT#4A • Top of Productive Horizon: N/A 8.KB(ft above MSL): 90' 15.Field/Pool(s): GL(ft above MSL): 90' REDOUBT SHOAL UNDEFINED . Total Depth: 1000'FNL, 1025'FWL SEC 20 T7NR13W 9.Plug Back Depth(MD+TVD): 18,082'MD/12,467'TVD • 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface: x- 200633.14 y-2449937.8 Zone- 4 18,091'MD/12,476'TVD ' 381203 TPI: x- y- Zone- 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x- 212248.9237 y-2446729.3624 Zone- 4 N/A N/A 18.Directional Survey: Yes U No U 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) N/A 21.Logs Obtained(List all logs here and submit electronic and printed information per 20AAC25.071): 22.Re-drill/Lateral Top Window MD/TVD: DRHO GR CALI ILD CNS PEF RHOB N/A 23. CASING,LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH ND AMOUNT CASING GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT PULLED 30" 150# A-36 0 200' 0 200' -- 13 3/8" 68# L80 0 3,530' 0 2,918 18.5" 6462 cu ft 9 5/8" 47# L80 0 10,517' 0 7,114' 12 1/4" 4613 cu ft 7 5/8" 29.7# L80 5,074' 14,820' 9,565' 9,565' 8.5" 258 cu ft 5 1/2" 17# L80 14,583' 18,082' 9,414' 12,467' 6 3/4" 1792 cu ft 24.Open to production or injection? Yes ❑ No p 25. TUBING RECORD If Yes,list each interval open(MD+TVD of Top and Bottom;Perforation SIZE DEPTH SET(MD) PACKER SET(MD/ND) Size and Number): 3 1/2"L80 9.3# N/A N/A 17784'to 17,855'MD 6SPF 12,182'to 12,248'ND • , - oaf 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. ,. �°" ' Was hydraulic fracturing used during completion'? Yes U No U i SOt17 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED n 4 x : 4G . ' PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): None-Collapsed Casing before getting on line Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 7/16/2003 92.2 hrs Test Period 191.4 47.85 636.9 50/64th 250 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 15 1500 24-Hour Rate - 49.8 12.45 165.8 26 28. CORE DATA Conventional Core(s)Acquired? Yes Ell No❑ Sidewall Cores Acquired? Yes❑ No 0 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. Core#1 15,424'to 15,486' Core#2 15,819'to 15,826' Core#3 16,153 to 16,207' RBDMS MAY 2 0 2013 - Form 10-407 Revised 10/2012 CONTINUED ON REVERSE ?•1.1 Submit original only • • 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? 12 Yes ❑ No If yes,list intervals and formations tested, briefly summarizing test results.Attach separate sheets to this form,if Permafrost-Top needed,and submit detailed test information per 20 AAC 25.071. Permafrost-Base See Attached sheets Formation at total depth: 31. List of Attachments: Well Summary Sheets-Redoubt Shoal Unit/PTS Test Report for RU-4A Gas Zone 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Conrad Perry Email: conrad.per cookinlet.net Printed Name: Conrad 4/ Title: Drilling Manager Signature. Phone: 907-433-3816 Date: 5/14/2013 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1b: Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 • • Cook Inlet Energy RECEIVED 1 6 2013 May 14, 2013 ADGCC Ms. Cathy Foerster, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage,Alaska 99501 Re: Redoubt Unit#4A Well Completion Cook Inlet Energy, LLC: Redoubt Unit#4A Permit to Drill No: 203-081 Dear Ms. Foerster, Enclosed please find the Well Completion Report and Data required by the AOGCC's approval of Permit to Drill#203-081 for Redoubt Unit#4A. Cook Inlet Energy is providing this information from archival files and to the best of our knowledge it is accurate. Cook Inlet Energy,however, does not take any responsibility for any inaccuracies or ommissions in this submittal for a well that was drilled and completed by another operator. Enclosed please find: 1. Well Completion report(AOGCC Form 10-407)with attachments 2. Report of Daily Drilling Operations 3. List of Formations and other geologic markers encountered and depths 4. List of depth and formation names for oil and gas shows 5. Copy of Production Test data 6. Paper copy of Wellbore Directional Survey 7. Copies of final mudlog and report&CD. 8. Digital version of all logs run in LAS format and directional survey in ASCII format (CD) 9. Paper copies of all logs run and reproducible file on CD. If you have any questions,please contact me at(907)-433-3816. Sincerely, Conrad P-1y► Drilling Manager—Coo Inlet Energy 601 W.5t`Avenue,Suite 310,Anchorage,AK 99501 (907)334-6745*(907)334-6735 fax Redoubt 0#4A Casing Schematic -July 2003 S 'k I I T 30" A-36 200 TVD 150# Welded 200 MD 13 3/8" L-80 2918 TVD , 68# BTC 3530 MD TOL @5074 MD 1 1 ` ti' f 9 5/8" L-80 7114 TVD .x El 47# BTC 10517 MD y 3 1/2"9.3#L-80 Tubing TOF 14,319' GLM 14,395' Tieback Stem 14,574' Th TOL 14,583' .1 7 5/8" L-80 9565 TVD t, 29.7# Hydril 521 14820 MD i Perforations 17,784'to 17,855' —' 5 1/2" L-80 12467 TVD 17# Hydril 521 18082 MD F'roductionTestingServices WELL RU#4A DATE 07/15/03 TO 07/17/03 Clock Cum Choke Tubing Tubing Static Diff. Meter Gas Cum Fluid Fluid Fluid Cum. Oil Oil Cum H2O H2O Cum Lift Date time Time Comments Size Pres. 1/A 0/A Temp Pres. Pres Temp Orifice Rate Gas Meter BSW Gain Rate Fluid Gain Rate Oil Gain Rate H2O GOR Solids Rate mm/dd/yy hh/mm hr. in. psi(g) °F psi(g) in.of H2O F in. MMCF/I MMCF BBL % BBL BBL/D BBL BBL BBL/D BBL BBL BBL/D BBL MMCF/BB % MMCF/D 07/15/03 1550 0.00 Open well to PTS 0.00 0.00 1600 0.17 5.000 240 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 4.000 1630 0.67 5.000 143 14 100.00 14 657 14 0.00 0.00 0.00 13.69 657.12 13.69 4.000 1700 1.17 5.000 13 80 100.00 66 3172 80 0.00 0.00 0.00 66.09 3172.32 79.78 4.000 1730 1.67 5.000 205 111 100.00 31 1508 111 0.00 0.00 0.00 31.42 1508.16 111.20 4.000 1800 2.17 5.000 145__-_-__-- 134 100.00 23 1107 134 0.00 0.00 0.00 23.07 1107.36 134.27-- 10.000 1830 2.67 5.000 112_--_-_--- 157 100.00 23 1109 157 0.00 0.00 0.00 23.11 1109.28 157.38-- 10.000 1900 3.17 5.000 110 172 100.00 15 714 172 0.00 0.00 0.00 14.87 713.76 172.25 10.000 1930 3.67 5.000 200 190 100.00 18 872 190 0.00 0.00 0.00 18.16 871.68 190.41 10.000 • 2000 4.17 5.000 280 209 100.00 18 872 209 0.00 0.00 0.00 18.16 871.68 208.57 10.000 2030 4.67 5.000 333 241 100.00 32 1557 241 0.00 0.00 0.00 32.43 1556.64 241.00 12.000 2100 5.17 5.000 370 285 100.00 44 2088 285 0.00 0.00 0.00 43.50 2088.00 284.50 12.000 2130 5.67 28.000 200 334 100.00 50 2378 334 0.00 0.00 0.00 49.55 2378.40 334.05 12.000 2200 6.17 32.000 525 368 100.00 34 1611 368 0.00 0.00 0.00 33.56 1610.88 367.61 10.000 2230 7. 7 32.000 0-.---..-- 368 100.00 0 0 368 0.00 0.00 0.00 0.00 0.00 367.61-- 10.000 2300 7.17 32.000 0 368 100.00 0 0 368 0.00 0.00 0.00 0.00 0.00 367.61 12.000 2330 7.67 32.000 25____-_--- 396 100.00 28 1347 396 0.00 0.00 0.00 28.06 1346.88 395.67-_ 11.000 07/16/03 0 8.17 32.000 25___--_--- 406 100.00 10 476 406 0.00 0.00 0.00 9.91 475.68 405.58-- 11.000 30 8.67 32.000 25_-_--_--- 420 100.00 15 714 420 0.00 0.00 0.00 14.88 714.24 420.46-- 11.000 100 9. 7 16.000 50--..-�--� 460 100.00 40 1901 460 0.00 0.00 0.00 38.21 1391.00 468.32-- 11.000 130 9.67 16.000 550 468 100.00 8 396 468 0.00 0.00 0.00 8.25 396.00 468.32 10.000 200 1 1 1 1 230 10 67 18.000 1180 485 100.00 3 158 485 0.00 0.00 0.00 3.30 2 158.40 484.83-- 10.000 300 11.17 18.000 1220 500 100.00 15 713 500 0.00 0.00 0.00 14.86 713.28 499.69 10.000 330 11.67 18.000 1080 30 26 65 1.000 0.204 0.099 516 100.00 17 792 516 0.00 0.00 0.00 16.51 792.48 516.20 10.000 400 400 12.17 18.000 1120■■■ 30 22 65 0.188 0.103 516 100.00 0 0 516 0.00 0.00 0.00 0.00 0.00 516.20 10.000 430 12.67 18.000 1170-__ 30 18 65- 0.170 0.107 520 100.00 3 159 520 0.00 0.00 0.00 3.31 158.88 519.51-- 10.000 500 13.17 18.000 1260__- 30 16 65_ 0.160 0.111 520 100.00 0 0 520 0.00 0.00 0.00 0.00 0.00 519.51-- 10.000 530 13.67 18.000 1200__- 30 14 65_ 0.150 0.114 520 100.00 0 0 520 0.00 0.00 0.00 0.00 0.00 519.51-_ 10.000 • 600 14.17 18.000 1220_-- 30 14 65_ 0.150 0.117 521 100.00 2 78 521 0.00 0.00 0.00 1.62 77.76 521.13-_ 10.000 630 14.67 18.000 1150___ 30 8 65_ 0.113 0.120 523 100.00 2 81 523 0.00 0.00 0.00 1.68 80.64 522.81-_ 10.000 700 15.17 18.000 1200_-_ 30 0 65_ 0.000 0.120 534 100.00 12 555 534 0.00 0.00 0.00 11.56 554.88 534.37-_ 10.000 730 15.67 18.000 1140___ 25 0_-_- 546 100.00 12 553 546 0.00 0.00 0.00 11.53 553.44 545.90_- 0.000 800 22.0 16.17 0 875�. - 25 2.--- 546 100.00 0 10 0.000 0 546 0.00 0.00 0.00 0.00 0.00 546.10-- 830 0.000 900 930 22.000 175 50--- 15 0 78- 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10-- 0.000 1000 22.000 50 15 0 72 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1030 22.000 25 10 0 65 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1100 22.000 50 10 0 65 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1130 22.000 50 10 0 62 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1200 22.000 50 10 0 63 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1230 22.000 10 10 0 64 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 Prepared by pts 5/15/2013 Page 1 Product ion Testing Services WELL RU#4A DATE 07/15/03 TO 07/17/03 Clock Cum ' Choke Tubing' Tubing' Static Diff. Meter Gas Cum Fluid Fluid Fluid Cum. Oil Oil Cum H2O H2O Cum Lift Date time Time Comments Size Pres. I/A 0/A Temp Pres. Pres Temp Orifice Rate Gas Meter BSW Gain Rate Fluid Gain Rate Oil Gain Rate H2O GOR Solids Rate mm/dd/yy hh/mm hr. in. psi(g) °F psi(g) in.of H2O F in. MMCF/D MMCF BBL % BBL BBL/D BBL BBL BBL/D BBL BBL BBL/D BBL MMCF/BBL % MMCF/D 1300 22.000_ 15 10 0 63 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 1330 22.000 15 10 0 63 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 I 1400 0.00 22.000 50 1500 10 0 63 0.000 0.120 546 100.00 0 0 546 0.00 0.00 0.00 0.00 0.00 546.10 0.000 ' 1430 0.50 22.000 350 1500 10 0 64 0.000 0.120 550 100.00 4 178 550 0.00 0.00 0.00 3.71 178.08 549.81 15.000 1500 1.00 22.000 500 1650 40 48 93 0.301 0.126 586 100.00 36 1741 586 0.00 0.00 0.00 36.27 1740.96 586.08 0.000 1530 1.50 56.000 230 1560 50 0 90 0.000 0.126 588 100.00_ 2 90 588 0.00 0.00 0.00 1.87 89.76 587.95 6.000 1600 2.00 56.000 200 1640 60 10 90 1.500 0.368 0.134 595 100.00 7 317 595 0.00 0.00 0.00 6.61 317.28 594.56 6.000 1630 2.50 60.000 300 1575 90 8 85 0.393 0.142 600 100.00 6 284 600 0.00 0.00 0.00 5.92 284.16 600.48 6.000 • 1700 3.00 60.000 110 1500 50 2 85 0.154 0.147 615 100.00 15 713 615 0.00 0.00 0.00, 14.85 712.80 615.33 8.000 1730 3.50 60.000 130 1515 45 0 77 0.000 0.147 618 100.00 3 128 618 0.00 0.00 0.00 2.67 128.16 618.00 8.000 1800 4.00 60.000 90 1540 60 20 87 0.522 0.158 628 100.00 10 478 628 0.00 0.00 0.00 9.96 478.08 627.96 10.000 1830 4.50 60.000 290 1520 100 25 94 0.722 0.171 638 100.00 10 472 638 0.00 0.00 0.00 9.84 472.32 637.80 10.000 1900 5.00' 60.000 100 1510 30 0 81 0.000 0.171 643 100.00 5 238 643 0.00 0.00 0.00 4.95 237.60 642.75 10.000 1930 5.50 64.000 170 1500 150 11 110 2.000 1.043 0.193 664 100.00 21 1030 664 0.00 0.00 0.00 21.46 1030.08 664.21 10.000 2000 6.00 64.000 390 1500 300 40 110 2.783 0.233 679 100.00 15 710 679 0.00 0.00 0.00 14.79 709.92 679.00 10.000 2030 6.50 64.000, 180 1500 150 12 120 1.079 0.273 691 100.00 12 555 691 0.00 0.00 0.00 11.56 554.88 690.56 10.000 2100 7.00 64.000 480 1500 300 35 96 2.641 0.312 697 100.00 7 318 697, 0.00 0.00 0.00 6.63 318.24 697.19 10.000 2130 7.50 64.000 120 1450 150 26 108 1.607 0.356 707 100.00 10 473 707 0.00 0.00 0.00 9.86 473.28 707.05 10.000 2200 8.00 64.000 620 1400 300 20+_ 94 2.001 0.393 722 100.00 15 713 722 0.00 0.00 0.00 14.86 713.28 721.91 10.000 2230 8.50 52.000 440 1350 190 18 96 1.513 0.430 725 3 158 725 0.00 0.00 0.00 3.29 157.92 725.20 10.000 2300 9.00 52.000 280 1400 210 19 98 1.628 0.463 727 2 79 727 0.00 0.00 0.00 1.65 79.20 726.85 10.000 2330 9.50 52.000 370 1400 290 32 94 2.488 0.506 730 3 159 730 0.00 0.00 0.00 3.32 159.36 730.17 10.000 07/17/03 0 10.00 52.000 360 1400 300 29 104 2.384 0.556 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 30 10.50 52.000 360 1400 300 28 104 _ 2.343 0.606 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 100, 11.00 52.000 360 1400 300 28 104 2.343 0.654 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 130 11.50 52.000 360 1400 300 28 110 2.328 0.703 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 200 12.00 52.000 360 1400 300 27 104 2.300 0.751, 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 230 12.50 52.000 360 1400 300 27 110 2.286 0.799 730 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 300 13.00 52.000 360 1400 300 29 104 2.384 0.848 730, 0 0 730 0.00 0.00 0.00 0.00 0.00 730.17 10.000 • 330 13.50 52.000 360 1400 300 28 111 2.326 0.897 733 3 144 733 0.00 0.00 0.00 2.99 143.52 733.16 10.000 400 14.00 52.000 360 1350 300 27 104, 2.300, 0.945 735 2 94 735 0.00 0.00 0.00 1.95 93.60 735.11 10.000 430 14.50 52.000 360 1390 300 25 111 2.198 0.992 736 1 48 736 0.00 0.00 0.00 1.00 48.00 736.11 10.000 500 15.00 52.000 360 1350 300 26 107 2.250 1.038 737 1 34 737 0.00 0.00 0.00 0.70 33.60 736.81 10.000 530 15.50 52.000 360 1350 300 27 105 2.298 1.086 737 0 0 737 0.00 0.00 0.00 0.00 0.00 736.81 10.000 600 16.00 52.000 360 1350 300 26 106 2.253 1.133 738 2 79 738 0.00 0.00 0.00 1.65 79.20 738.46 10.000 630 16.50 52.000 360 1350 300 26 105 2.255 1.180 742 3 158 742 0.00 0.00 0.00 3.30 158.40 741.76 10.000 700 17.00 52.000 360 1350 305 26 107 2.269 1.227 745 3 159 745 0.00 0.00 0.00 3.31 158.88 745.07 10.000 730 17.50 52.000 370 1350 305 26 106 2.272 1.274 747 2 79 747 0.00 0.00 0.00 1.65 79.20 746.72 10.000 800 18.00 52.0001 375 1350 305 31 106 2.480 1.324 750 3 158 750 0.00 0.00 0.00 3.30 158.40 750.02 10.000 800 Well shut in,G/L shut in Prepared by pts 5/15/2013 Page 2 • • 5/2/2013 Redoubt Unit#4A, API# 50-733-20506-01 Geologic Markers CONFIDENTIAL Name Measured Depth TVD Tyonek Gas Sd 16,899' 11,300' Hemlock 17,735' 12,138' West Foreland NR • • 5/2/2013 Redoubt Unit#4A, API#50-733-20506-01 Oil and Gas Shows CONFIDENTIAL Name Measured Depth TVD Tyonek Gas Sd 16899 11300 Gas Productive Sperry-Sun Drilling Services Alaska Cook Inlet Plan: Redoubt Unit#4A - RU#4A Rig MWD+SAG Survey Report 3 July, 2003 Surface Coordinates:2449937.80 N, 200633.14 E (60°41'43.7122"N, 151°40'14.3890"169 Grid Coordinate System:NAD27 Alaska State Planes,Zone 4 Kelly Bushing:90.00ft above Mean Sea Level • sperr-'y-sun DRILLING SERVICES Survey Ref:svy95 A Halliburton Company Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unit#4A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) RUtt4 Reca 0.00 0.000 0.000 -90.00 0.00 0.00 N 0.00 E 2449937.80 N 200633.14 E 0.00 130.00 0.000 0.000 40.00 130.00 0.00 N 0.00 E 2449937.80 N 200633.14 E 0.000 0.00 177.00 0.250 32.000 87.00 177.00 0.09 N 0.05 E 2449937.89 N 200633.19 E 0.532 -0.02 300.00 1.460 93.400 209.99 299.99 0.22 N 1.76 E 2449938.02 N 200634.90 E 1.104 1.17 • 400.00 3.260 86.380 309.90 399.90 0.33 N 5.87 E 2449938.13 N 200639.01 E 1.820 4.18 500.00 4.780 76.960 409.65 499.65 1.45 N 12.77 E 2449939.25 N 200645.91 E 1.652 8.61 600.00 5.810 74.930 509.22 599.22 3.70 N 21.71 E 2449941.50 N 200654.85 E 1.047 13.82 700.00 6.680 80.210 608.63 698.63 6.01 N 32.33 E 2449943.81 N 200665.47 E 1.042 20.25 800.00 7.540 88.850 707.86 797.86 7.13 N 44.63 E 2449944.93 N 200677.77 E 1.370 28.71 900.00 8.660 95.930 806.86 896.86 6.48 N 58.67 E 2449944.28 N 200691.81 E 1.498 39.67 1000.00 10.070 98.480 905.53 995.53 4.41 N 74.81 E 2449942.21 N 200707.95 E 1.469 53.12 1100.00 11.760 100.850 1003.72 1093.72 1.21 N 93.47 E 2449939.01 N 200726.61 E 1.748 69.23 1200.00 13.360 102.020 1101.32 1191.32 3.12 S 114.78 E 2449934.68 N 200747.92 E 1.620 88.06 1300.00 15.290 103.450 1198.21 1288.21 8.59 S 138.90 E 2449929.21 N 200772.04 E 1.962 109.76 1400.00 17.190 104.900 1294.21 1384.21 15.46 S 166.01 E 2449922.34 N 200799.15E 1.943 134.61 1500.00 19.180 105.790 1389.21 1479.21 23.73 S 196.10 E 2449914.07 N 200829.24 E 2.009 162.63 1600.00 21.810 105.410 1482.88 1572.88 33.14 S 229.82 E 2449904.66 N 200862.96 E 2.633 194.13 1700.00 24.570 104.270 1574.79 1664.79 43.20 S 267.89 E 2449894.60 N 200901.03 E 2.796 229.31 1800.00 27.960 102.600 1664.45 1754.45 53.44 S 310.93 E 2449884.36 N 200944.07 E 3.469 268.34 1900.00 31.210 102.470 1751.40 1841.40 64.15 S 359.12E 2449873.65 N 200992.26E 3.251 311.54 2000.00 35.330 102.300 1834.99 1924.99 75.91 S 412.69 E 2449861.89 N 201045.83 E 4.121 359.46 ill 2100.00 39.060 100.630 1914.64 2004.64 87.89 S 471.93 E 2449849.91 N 201105.07 E 3.864 411.77 2200.00 42.820 101.230 1990.17 2080.17 100.32 S 536.25E 2449837.48 N 201169.39E 3.780 468.20 2300.00 45.760 102.100 2061.74 2151.74 114.45 S 604.62 E 2449823.35 N 201237.76 E 3.002 528.79 2400.00 47.900 101.900 2130.15 2220.15 129.61 S 675.96E 2449808.19 N 201309.10E 2.145 592.27 2500.00 50.930 100.800 2195.20 2285.20 144.54 S 750.41 E 2449793.26 N 201383.55 E 3.143 657.94 2600.00 53.900 99.930 2256.19 2346.19 158.79 S 828.35 E 2449779.01 N 201461.49 E 3.049 725.77 2700.00 52.010 100.140 2316.43 2406.43 172.69 S 906.95E 2449765.11 N 201540.09E 1.897 793.86 2800.00 51.170 100.320 2378.56 2468.56 186.61 S 984.06 E 2449751.19 N 201617.20 E 0.852 860.84 2900.00 51.920 100.420 2440.75 2530.75 200.70 S 1061.09 E 2449737.10 N 201694.23 E 0.754 927.89 3 July,2003-10:38 Page 2 of 7 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unit#4A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 3000.00 51.540 100.760 2502.69 2592.69 215.13 S 1138.26 E 2449722.67 N 201771.40 E 0.464 995.26 3100.00 51.940 101.360 2564.61 2654.61 230.20 S 1215.32 E 2449707.60 N 201848.46 E 0.618 1062.98 3200.00 50.930 102.030 2626.95 2716.95 246.04 S 1291.89 E 2449691.76 N 201925.03 E 1.138 1130.83 3300.00 52.880 102.190 2688.64 2778.64 262.55 S 1368.83 E 2449675.25 N 202001.97 E 1.954 1199.41 3400.00 53.380 102.140 2748.64 2838.64 279.41 S 1447.04 E 2449658.39 N 202080.18 E 0.502 1269.17 3500.00 51.560 102.100 2809.56 2899.56 296.06 S 1524.57E 2449641.74 N 202157.71 E 1.820 1338.28 • 3600.00 47.960 102.380 2874.15 2964.15 312.24 S 1599.16 E 2449625.56 N 202232.30 E 3.606 1404.88 3700.00 45.140 102.750 2942.91 3032.91 328.02 S 1670.01 E 2449609.78 N 202303.15 E 2.833 1468.42 3800.00 46.460 101.260 3012.63 3102.63 342.92 S 1740.13 E 2449594.88 N 202373.27 E 1.698 1530.82 3900.00 47.450 100.640 3080.89 3170.89 356.80 S 1811.88 E 2449581.00 N 202445.02 E 1.089 1593.77 4000.00 50.660 101.740 3146.41 3236.41 371.47 S 1885.96E 2449566.33 N 202519.10E 3.316 1658.99 4100.00 53.260 102.670 3208.03 3298.03 388.13 S 1962.93 E 2449549.67 N 202596.07 E 2.701 1727.68 4200.00 53.550 103.030 3267.65 3357.65 405.99 S 2041.20 E 2449531.81 N 202674.34 E 0.409 1798.15 4300.00 54.470 102.930 3326.41 3416.41 424.16 S 2120.05 E 2449513.64 N 202753.19 E 0.924 1869.26 4400.00 55.820 102.140 3383.56 3473.56 441.97 S 2200.15E 2449495.83 N 202833.29E 1.498 1941.07 4500.00 56.430 101.980 3439.30 3529.30 459.31 S 2281.34 E 2449478.49 N 202914.48 E 0.624 2013.38 4600.00 57.240 101.940 3494.00 3584.00 476.66 S 2363.24 E 2449461.14 N 202996.38 E 0.811 2086.23 4700.00 56.870 101.150 3548.39 3638.39 493.46 S 2445.46 E 2449444.34 N 203078.60 E 0.759 2158.95 4800.00 57.040 100.810 3602.91 3692.91 509.42 S 2527.74 E 2449428.38 N 203160.88 E 0.332 2231.17 4900.00 56.670 101.700 3657.59 3747.59 525.76 S 2609.86 E 2449412.04 N 203243.00 E 0.832 2303.52 5000.00 54.910 103.540 3713.82 3803.82 543.82 S 2690.56 E 2449393.98 N 203323.70 E 2.326 2375.93 5100.00 53.970 104.760 3771.97 3861.97 563.70 S 2769.44 E 2449374.10 N 203402.58 E 1.367 2448.20 5200.00 54.000 104.780 3830.77 3920.77 584.32 S 2847.65 E 2449353.48 N 203480.79 E 0.034 2520.45 5300.00 54.590 105.140 3889.13 3979.13 605.28 S 2926.10 E 2449332.52 N 203559.24 E 0.658 2593.11 III 5400.00 55.110 105.030 3946.70 4036.70 626.56 S 3005.05 E 2449311.24 N 203638.19 E 0.528 2666.35 5500.00 55.160 105.360 4003.87 4093.87 648.07 S 3084.23 E 2449289.73 N 203717.37 E 0.275 2739.92 5600.00 55.510 105.660 4060.75 4150.75 670.06 S 3163.48 E 2449267.74 N 203796.62 E 0.428 2813.86 5700.00 54.060 104.520 4118.41 4208.41 691.34 S 3242.36 E 2449246.46 N 203875.50 E 1.723 2887.05 5800.00 53.880 104.070 4177.23 4267.23 711.30 S 3320.73 E 2449226.50 N 203953.87 E 0.406 2958.98 5900.00 52.830 103.160 4236.92 4326.92 730.19 S 3398.70 E 2449207.61 N 204031.84 E 1.279 3029.91 6000.00 53.030 103.040 4297.20 4387.20 748.28 S 3476.42 E 2449189.52 N 204109.56 E 0.222 3100.11 6100.00 53.350 102.770 4357.11 4447.11 766.16 S 3554.46 E 2449171.64 N 204187.60 E 0.386 3170.42 6200.00 53.880 102.810 4416.43 4506.43 783.98 S 3632.96 E 2449153.82 N 204266.10 E 0.531 3241.05 6300.00 54.430 102.720 4474.99 4564.99 801.89 S 3712.02 E 2449135.91 N 204345.16 E 0.555 3312.14 6400.00 55.030 102.590 4532.74 4622.74 819.78 S 3791.68 E 2449118.02 N 204424.82 E 0.609 3383.66 3 July,2003-10:38 Page 3 of 7 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unit#4A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 6500.00 55.500 102.390 4589.71 4679.71 837.55 S 3871.91 E 2449100.25 N 204505.05 E 0.498 3455.55 6600.00 53.670 102.240 4647.66 4737.66 854.93 S 3951.53 E 2449082.87 N 204584.67 E 1.834 3526.71 6700.00 52.680 102.180 4707.60 4797.60 871.86 S 4029.77 E 2449065.94 N 204662.91 E 0.991 3596.54 6800.00 52.730 102.200 4768.19 4858.19 888.66 S 4107.53 E 2449049.14 N 204740.67 E 0.052 3665.92 6900.00 53.790 102.370 4828.01 4918.01 905.71 S 4185.83 E 2449032.09 N 204818.97 E 1.069 3735.87 7000.00 53.370 102.360 4887.38 4977.38 922.94 S 4264.43 E 2449014.86 N 204897.57 E 0.420 3806.17 III 7100.00 51.980 102.470 4948.01 5038.01 940.04 S 4342.09 E 2448997.76 N 204975.23 E 1.393 3875.68 7200.00 52.450 102.720 5009.28 5099.28 957.27 S 4419.22 E 2448980.53 N 205052.36 E 0.510 3944.88 7300.00 52.460 102.630 5070.22 5160.22 974.67 S 4496.57 E 2448963.13 N 205129.71 E 0.072 4014.35 7400.00 52.140 101.920 5131.37 5221.37 991.49 S 4573.88E 2448946.31 N 205207.02E 0.647 4083.42 7500.00 51.820 100.660 5192.97 5282.97 1006.92 S 4651.14E 2448930.88 N 205284.28E 1.043 4151.51 7600.00 51.520 100.110 5254.98 5344.98 1021.06 S 4728.30E 2448916.74 N 205361.44E 0.525 4218.68 7700.00 50.960 100.040 5317.59 5407.59 1034.70 S 4805.07 E 2448903.10 N 205438.21 E 0.563 4285.24 7800.00 49.490 100.180 5381.57 5471.57 1048.19 S 4880.73 E 2448889.61 N 205513.87 E 1.474 4350.86 7900.00 48.420 100.360 5447.23 5537.23 1061.63 S 4954.94 E 2448876.17 N 205588.08 E 1.079 4415.36 8000.00 48.230 100.530 5513.72 5603.72 1075.18 S 5028.40 E 2448862.62 N 205661.54 E 0.229 4479.36 8100.00 47.840 100.400 5580.59 5670.59 1088.68 S 5101.52 E 2448849.12 N 205734.66 E 0.402 4543.09 8200.00 47.870 100.260 5647.69 5737.69 1101.98 S 5174.46 E 2448835.82 N 205807.60 E 0.108 4606.54 8300.00 47.760 100.220 5714.84 5804.84 1115.15 S 5247.38 E 2448822.65 N 205880.52 E 0.114 4669.89 8400.00 48.080 100.220 5781.86 5871.86 1128.32 S 5320.42 E 2448809.48 N 205953.56 E 0.320 4733.34 8500.00 49.390 99.830 5847.81 5937.81 1141.40 S 5394.44 E 2448796.40 N 206027.58 E 1.342 4797.46 8600.00 49.700 99.710 5912.70 6002.70 1154.31 S 5469.43 E 2448783.49 N 206102.57 E 0.323 4862.19 8700.00 50.550 99.960 5976.81 6066.81 1167.42 S 5545.04 E 2448770.38 N 206178.18 E 0.871 4927.52 • 8800.00 51.510 100.300 6039.70 6129.70 1181.10 S 5621.57 E 2448756.70 N 206254.71 E 0.996 4993.92 8900.00 53.270 100.210 6100.72 6190.72 1195.20 S 5699.52 E 2448742.60 N 206332.66 E 1.761 5061.66 9000.00 54.180 100.120 6159.89 6249.89 1209.43 S 5778.88 E 2448728.37 N 206412.02 E 0.913 5130.53 9100.00 54.820 99.800 6217.96 6307.96 1223.51 S 5859.06 E 2448714.29 N 206492.20 E 0.691 5199.93 73.26 E 1.060 5269.95 9200.00 55.880 99.820 6274.81 6364.81 1237.52 S 5940.12 E 2448700.28 N 206573.26 9300.00 55.370 100.030 6331.28 6421.28 1251.75 S 6021.42 E 2448686.05 N 206654.56 E 0.539 5340.28 9400.00 55.110 101.720 6388.29 6478.29 1267.25 S 6102.10E 2448670.55 N 206735.24E 1.413 5410.98 9500.00 55.460 102.050 6445.24 6535.24 1284.17 S 6182.53 E 2448653.63 N 206815.67 E 0.443 5482.46 9600.00 56.130 102.230 6501.46 6591.46 1301.57 S 6263.39 E 2448636.23 N 206896.53 E 0.686 5554.55 9700.00 55.910 102.400 6557.35 6647.35 1319.25 S 6344.40 E 2448618.55 N 206977.54 E 0.261 5626.96 9800.00 56.080 102.920 6613.27 6703.27 1337.42 S 6425.28 E 2448600.38 N 207058.42 E 0.463 5699.59 9900.00 56.270 103.180 6668.94 6758.94 1356.18 S 6506.21 E 2448581.62 N 207139.35 E 0.288 5772.65 3 July,2003-10:38 Page 4 of 7 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unitli4A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°I100ft) 10000.00 56.540 103.360 6724.27 6814.27 1375.30 S 6587.29 E 2448562.50 N 207220.43 E 0.309 5846.05 10100.00 56.670 103.590 6779.31 6869.31 1394.76 S 6668.48 E 2448543.04 N 207301.62 E 0.232 5919.76 10200.00 54.410 103.650 6835.89 6925.89 1414.17 S 6748.61 E 2448523.63 N 207381.75 E 2.261 5992.66 10300.00 53.620 103.840 6894.65 6984.65 1433.40 S 6827.20 E 2448504.40 N 207460.34 E 0.805 6064.27 10400.00 53.390 103.900 6954.12 7044.12 1452.67 S 6905.25 E 2448485.13 N 207538.39 E 0.235 6135.51 10500.00 52.990 105.150 7014.04 7104.04 1472.74 S 6982.75 E 2448465.06 N 207615.89 E 1.078 6206.87 • 10600.00 54.300 106.270 7073.32 7163.32 1494.56 S 7060.28 E 2448443.24 N 207693.42 E 1.590 6279.40 10700.00 57.670 106.900 7129.25 7219.25 1518.22 S 7139.70 E 2448419.58 N 207772.84 E 3.410 6354.58 10800.00 60.070 107.960 7180.95 7270.95 1543.87 S 7221.36 E 2448393.93 N 207854.50 E 2.566 6432.74 10900.00 60.240 107.750 7230.71 7320.71 1570.46 S 7303.92 E 2448367.34 N 207937.06 E 0.249 6512.21 11000.00 59.900 107.520 7280.61 7370.61 1596.72 S 7386.51 E 2448341.08 N 208019.65 E 0.394 6591.48 11100.00 59.510 106.990 7331.05 7421.05 1622.33 S 7468.97 E 2448315.47 N 208102.11 E 0.601 6670.22 11200.00 58.830 106.900 7382.30 7472.30 1647.36 S 7551.11 E 2448290.44 N 208184.25 E 0.684 6748.33 11300.00 58.320 106.450 7434.44 7524.44 1671.84 S 7632.85 E 2448265.96 N 208265.99 E 0.638 6825.79 11400.00 56.630 106.570 7488.21 7578.21 1695.80 S 7713.69 E 2448242.00 N 208346.83 E 1.693 6902.22 11500.00 55.590 106.440 7543.97 7633.97 1719.39 S 7793.28 E 2448218.41 N 208426.42 E 1.046 6977.47 11600.00 53.500 107.140 7601.97 7691.97 1742.91 S 7871.26 E 2448194.89 N 208504.40 E 2.166 7051.47 11700.00 52.800 107.380 7661.94 7751.94 1766.65 S 7947.67 E 2448171.15 N 208580.81 E 0.726 7124.45 11800.00 53.080 105.950 7722.21 7812.21 1789.53 S 8024.12 E 2448148.27 N 208657.26 E 1.175 7196.88 11900.00 53.560 106.250 7781.94 7871.94 1811.77 S 8101.17 E 2448126.03 N 208734.31 E 0.537 7269.34 12000.00 52.840 107.390 7841.85 7931.85 1834.94 S 8177.82E 2448102.86 N 208810.96E 1.163 7342.10 12100.00 52.810 107.370 7902.27 7992.27 1858.74 S 8253.86 E 2448079.06 N 208887.00 E 0.034 7414.84 12200.00 52.400 106.130 7963.00 8053.00 1881.64 S 8329.93 E 2448056.16 N 208963.07 E 1.067 7487.00 • 12300.00 52.410 105.190 8024.01 8114.01 1903.02 S 8406.22E 2448034.78 N 209039.36E 0.745 7558.32 12400.00 51.550 105.680 8085.60 8175.60 1923.99 S 8482.16 E 2448013.81 N 209115.30 E 0.943 7629.10 12500.00 52.420 105.690 8147.19 8237.19 1945.29 S 8558.01 E 2447992.51 N 209191.15 E 0.870 7700.03 12600.00 53.790 105.620 8207.22 8297.22 1966.87 S 8635.02 E 2447970.93 N 209268.16 E 1.371 7772.01 12700.00 54.920 105.870 8265.50 8355.50 1988.92 S 8713.23 E 2447948.88 N 209346.37 E 1.148 7845.22 12800.00 56.230 105.930 8322.03 8412.03 2011.52 S 8792.56 E 2447926.28 N 209425.70 E 1.311 7919.62 12900.00 57.130 105.940 8376.96 8466.96 2034.46 S 8872.91 E 2447903.34 N 209506.05 E 0.900 7995.01 13000.00 57.690 105.600 8430.82 8520.82 2057.36 S 8953.99 E 2447880.44 N 209587.13 E 0.629 8070.92 13100.00 58.620 105.040 8483.59 8573.59 2079.80 S 9035.92 E 2447858.00 N 209669.06 E 1.045 8147.17 13200.00 58.320 104.150 8535.88 8625.88 2101.28 S 9118.41 E 2447836.52 N 209751.55 E 0.816 8223.19 13300.00 58.680 102.990 8588.13 8678.13 2121.28 S 9201.29 E 2447816.52 N 209834.43 E 1.053 8298.53 13400.00 57.710 102.430 8640.84 8730.84 2139.98 S 9284.19 E 2447797.82 N 209917.33 E 1.080 8373.03 3 July,2003-10:38 Page 5 of 7 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unit114A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°l1OOft) 13500.00 57.570 102.150 8694.36 8784.36 2157.96 S 9366.72 E 2447779.84 N 209999.86 E 0.275 8446.77 13600.00 57.210 101.490 8748.25 8838.25 2175.22 S 9449.17 E 2447762.58 N 210082.31 E 0.662 8519.97 13700.00 55.260 101.530 8803.83 8893.83 2191.80 S 9530.63 E 2447746.00 N 210163.77 E 1.950 8591.98 13800.00 54.740 100.570 8861.19 8951.19 2207.51 S 9611.02 E 2447730.29 N 210244.16 E 0.943 8662.61 13900.00 54.530 99.750 8919.06 9009.06 2221.89 S 9691.29 E 2447715.91 N 210324.43 E 0.701 8732.28 14000.00 55.290 99.930 8976.55 9066.55 2235.88 S 9771.91 E 2447701.92 N 210405.05 E 0.774 8801.94 III 14100.00 55.340 99.800 9033.46 9123.46 2249.96 S 9852.92 E 2447687.84 N 210486.06 E 0.118 8871.97 14200.00 53.910 99.180 9091.35 9181.35 2263.41 S 9933.34 E 2447674.39 N 210566.48 E 1.517 8941.12 14300.00 53.190 98.790 9150.76 9240.76 2275.97 S 10012.79 E 2447661.83 N 210645.93 E 0.785 9008.96 14400.00 52.420 99.200 9211.21 9301.21 2288.43 S 10091.47 E 2447649.37 N 210724.61 E 0.836 9076.16 14500.00 52.040 99.470 9272.46 9362.46 2301.25 S 10169.47 E 2447636.55 N 210802.61 E 0.436 9143.09 14600.00 51.030 99.400 9334.67 9424.67 2314.08 S 10246.71 E 2447623.72 N 210879.85 E 1.011 9209.45 14700.00 50.530 98.350 9397.90 9487.90 2326.04 S 10323.25 E 2447611.76 N 210956.39 E 0.955 9274.72 14800.00 49.170 96.640 9462.38 9552.38 2336.02 S 10399.03 E 2447601.78 N 211032.17 E 1.886 9338.10 RU#4A Rig MWD+SAG 14820.00 49.320 96.600 9475.43 9565.43 2337.77 S 10414.08 E 2447600.03 N 211047.22 E 0.765 9350.53 14870.00 44.650 100.670 9509.54 9599.54 2343.20 S 10450.20 E 2447594.60 N 211083.34 E 11.072 9381.20 14966.00 39.010 108.490 9581.09 9671.09 2359.05 S 10512.10 E 2447578.75 N 211145.24 E 7.993 9438.07 15056.00 37.670 113.370 9651.70 9741.70 2378.95 S 10564.22 E 2447558.85 N 211197.36 E 3.677 9490.30 15146.00 36.010 120.360 9723.76 9813.76 2403.24 S 10612.32 E 2447534.56 N 211245.46 E 5.006 9542.42 15242.00 34.350 123.470 9802.23 9892.23 2432.45 S 10659.27 E 2447505.35 N 211292.41 E 2.544 9596.94 15341.00 31.000 126.550 9885.55 9975.55 2463.05 S 10703.06 E 2447474.75 N 211336.20 E 3.777 9650.02 III 15436.00 25.990 130.730 9969.03 10059.03 2491.22 S 10738.52 E 2447446.58 N 211371.66 E 5.673 9695.24 15525.00 22.510 129.800 10050.16 10140.16 2514.85 S 10766.39 E 2447422.95 N 211399.53 E 3.933 9731.78 15624.00 21.630 128.540 10141.91 10231.91 2538.35 S 10795.22 E 2447399.45 N 211428.36 E 1.009 9768.94 15713.00 22.270 124.180 10224.46 10314.46 2558.05 S 10822.01 E 2447379.75 N 211455.15E 1.967 9802.05 15806.00 24.480 128.140 10309.83 10399.83 2579.85 S 10851.75 E 2447357.95 N 211484.89 E 2.914 9838.77 15898.00 25.680 137.210 10393.18 10483.18 2606.26 S 10880.29E 2447331.54 N 211513.43E 4.373 9877.65 15992.00 27.130 140.420 10477.38 10567.38 2637.73 S 10907.78E 2447300.07 N 211540.92E 2.164 9919.10 16090.00 25.510 139.630 10565.22 10655.22 2671.04 S 10935.69 E 2447266.76 N 211568.83 E 1.691 9962.06 16179.00 24.150 137.370 10645.99 10735.99 2699.03 S 10960.44E 2447238.77 N 211593.58E 1.863 9999.15 16273.00 22.970 136.190 10732.15 10822.15 2726.42 S 10986.16E 2447211.38 N 211619.30E 1.352 10036.55 16369.00 23.380 138.670 10820.41 10910.41 2754.24 S 11011.71 E 2447183.56 N 211644.85E 1.103 10074.12 16459.00 23.960 138.720 10902.83 10992.83 2781.38 S 11035.56 E 2447156.42 N 211668.70 E 0.645 10109.97 16556.00 24.960 136.470 10991.13 11081.13 2811.02 S 11062.65E 2447126.78 N 211695.79E 1.409 10149.90 3 July,2003-10:38 Page 6 of 7 DrillQuest 3.03.02.005 a Sperry-Sun Drilling Services Survey Report for Plan:Redoubt Unit#4A Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (/100ft) 16659.00 26.640 136.050 11083.86 11173.86 2843.41 S 11093.64 E 2447094.39 N 211726.78 E 1.641 10194.57 16745.00 27.080 134.270 11160.58 11250.58 2870.95 S 11121.04E 2447066.85 N 211754.18E 1.066 10233.34 16841.00 24.720 131.940 11246.94 11336.94 2899.63 S 11151.63E 2447038.17 N 211784.77E 2.677 10275.24 16937.00 26.080 136.730 11333.66 11423.66 2928.41 S 11181.03 E 2447009.39 N 211814.17 E 2.566 10316.34 17026.00 26.560 137.880 11413.44 11503.44 2957.42 S 11207.78E 2446980.38 N 211840.92E 0.787 10355.59 17116.00 27.240 137.150 11493.70 11583.70 2987.44 S 11235.28 E 2446950.36 N 211868.42 E 0.840 10396.08 • 17214.00 27.490 137.000 11580.73 11670.73 3020.43 S 11265.96 E 2446917.37 N 211899.10 E 0.265 10440.92 17311.00 26.780 135.310 11667.06 11757.06 3052.34 S 11296.60E 2446885.46 N 211929.74E 1.080 10485.01 17406.00 26.330 134.840 11752.03 11842.03 3082.41 S 11326.59 E 2446855.39 N 211959.73 E 0.523 10527.39 17498.00 27.160 133.130 11834.19 11924.19 3111.15 S 11356.38E 2446826.65 N 211989.52E 1.230 10568.75 17594.00 25.710 129.780 11920.16 12010.16 3139.46 S 11388.38E 2446798.34 N 212021.52E 2.166 10611.47 17688.00 25.170 125.080 12005.05 12095.05 3163.99 S 11420.41 E 2446773.81 N 212053.55 E 2.223 10651.72 17754.00 25.620 126.310 12064.67 12154.67 3180.51 S 11443.39 E 2446757.29 N 212076.53 E 1.051 10679.88 17826.00 21.360 121.330 12130.70 12220.70 3196.55 S 11467.15 E 2446741.25 N 212100.29 E 6.523 10708.30 17879.00 18.390 115.660 12180.54 12270.54 3205.19 S 11482.94E 2446732.61 N 212116.08E 6.675 10725.86 17975.00 13.310 98.300 12272.91 12362.91 3213.36 S 11507.55E 2446724.44 N 212140.69E 7.184 10749.70 18033.00 11.700 86.710 12329.54 12419.54 3213.98 S 11520.03E 2446723.82 N 212153.17E 5.127 10759.47 18091.00 11.700 86.710 12386.34 12476.34 3213.31 S 11531.77E 2446724.49 N 212164.91 E 0.000 10767.82 All data is in Feet(US Survey)unless otherwise stated.Directions and coordinates are relative to Grid North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes,Zone 4. The Dogleg Severity is in Degrees per 100 feet(US Survey). • Vertical Section is from Well and calculated along an Azimuth of 131.480°(Grid). Coordinate System is NAD27 Alaska State Planes,Zone 4. Grid Convergence at Surface is-1.457°. Magnetic Convergence at Surface is-21.662°(29-May-03) Based upon Minimum Curvature type calculations,at a Measured Depth of 18091.00ft., The Bottom Hole Displacement is 11971.10ft.,in the Direction of 105.570°(Grid). 3 July,2003-10:38 Page 7 of 7 DrillQuest 3.03.02.005 • CD2_Epoch_mudlogs_rpt_list.txt volume in drive D is RU#4A_Data volume Serial Number is FC8A-9BB3 Directory of D:\ 07/09/2003 09:21 AM <DIR> REDOUBTUNIT#4A 0 File(S) 0 bytes Directory of D:\REDOUBTUNIT#4A 07/09/2003 09:21 AM <DIR> . 07/09/2003 09:21 AM <DIR> 09/04/2003 08:22 AM <DIR> DML Data 09/04/2003 08:17 AM <DIR> LAS Files 09/04/2003 08:19 AM <DIR> Log PDF Files 08/21/2003 02:17 PM <DIR> RU#4A Final Report 09/04/2003 08:26 AM <DIR> RU#4 and #4A Composite Database 08/21/2003 02:32 PM <DIR> RU4A Morning Reports 0 File(s) 0 bytes Directory of D:\REDOUBTUNIT#4A\DML Data 09/04/2003 08:22 AM <DIR> . 09/04/2003 08:22 AM <DIR> .. 08/25/2003 09:12 AM 4,679,260 REDOUBTUNIT#4A.DBF 09/04/2003 09:39 AM 420 REDOUBTUNIT#4A.hdr 08/25/2003 09:12 AM 59,392 REDOUBTUNIT#4A.mdx 06/28/2003 11:31 AM 1,152 REDOUBTUNIT#4A_SCL.DBF 06/28/2003 11:31 AM 6,144 REDOUBTUNIT#4A_SCL.MDX 06/14/2003 06:30 AM 170,845 REDOUBTUNIT#4A_TVD.DBF 06/14/2003 06:30 AM 53,248 REDOUBTUNIT#4A_TVD.MDX 06/22/2003 03:20 AM 21,037 REDOUBTUNIT#4AR.DBF 06/22/2003 03:20 AM 9,216 REDOUBTUNIT#4AR.MDX 9 File(s) 5,000,714 bytes Directory of D:\REDOUBTUNIT#4A\LAS Files 09/04/2003 08:17 AM <DIR> . 09/04/2003 08:17 AM <DIR> 08/25/2003 09:11 AM 1,367,518 RU4A.las 09/04/2003 09:05 AM 7,842,450 RU4Composite.las 2 File(s) 9,209,968 bytes Directory of D:\REDOUBTUNIT#4A\Log PDF Files 09/04/2003 08:19 AM <DIR> . 09/04/2003 08:19 AM <DIR> .. 09/04/2003 09:41 AM 3,036,757 RU#$_Combo.pdf 09/04/2003 09:24 AM 3,640,398 RU#4A_Mudlog.pdf 09/04/2003 09:35 AM 4,234,008 Ru#4A_Drillingoynamics.pdf 3 File(s) 10,911,163 bytes Directory of D:\REDOUBTUNIT#4A\RU#4A Final Report 08/21/2003 02:17 PM <DIR> . 08/21/2003 02:17 PM <DIR> .. 09/05/2003 02:15 PM 427,008 RU4AWELL.doc 1 File(s) 427,008 bytes Directory of D:\REDOUBTUNIT#4A\RU#4 and #4A Composite Database 09/04/2003 08:26 AM <DIR> . 09/04/2003 08:26 AM <DIR> .. 07/09/2003 03:02 PM 24,894,510 RU4COMP.DBF 09/04/2003 08:32 AM 393 Ru4COMP.hdr 07/09/2003 01:48 PM 304,128 RU4COMP.MDX 07/09/2003 01:48 PM 130 RU4COMPR.DBF 07/09/2003 01:48 PM 4,096 RU4COMPR.MDX 07/09/2003 09:15 AM 756 Ru4COMP_SCL.DBF 07/09/2003 09:15 AM 6,144 RU4COMP_SCL.MDX 7 File(s) 25,210,157 bytes Directory of D:\REDOUBTUNIT#4A\RU4A Morning Reports 08/21/2003 02:32 PM <DIR> . 08/21/2003 02:32 PM <DIR> 05/06/2003 03:16 AM 25,781 20030506.htm 05/07/2003 04:49 AM 25,868 20030507.htm 05/08/2003 04:30 AM 25,759 20030508.htm 05/09/2003 06:20 AM 25,744 20030509.htm 05/10/2003 04:11 AM 25,958 20030510.htm 05/12/2003 03:41 AM 25,906 20030511.htm 05/12/2003 04:16 AM 25,896 20030512.htm 05/13/2003 04:12 AM 25,549 20030513.htm Page 1 • S cD2_epoch_mudlogs_rpt_1ist.txt 05/14/2003 03:21 AM 25,681 20030514.htm 05/15/2003 04:30 AM 25,567 20030515.htm 05/16/2003 04:07 AM 25,718 20030516.htm 05/17/2003 04:29 AM 25,983 20030517.htm 05/18/2003 04:07 AM 25,637 20030518.htm 05/19/2003 04:24 AM 25,535 20030519.htm 05/20/2003 03:11 AM 25,581 20030520.htm 05/21/2003 03:49 AM 25,956 20030521.htm 05/22/2003 03:00 AM 25,854 20030522.htm 05/23/2003 04:04 AM 25,793 20030523.htm 05/24/2003 03:11 AM 25,745 20030524.htm 05/25/2003 03:19 AM 25,750 20030525.htm 05/26/2003 04:19 AM 26,068 20030526.htm 05/27/2003 03:55 AM 25,907 20030527.htm 05/28/2003 03:42 AM 25,991 20030528.htm 05/29/2003 04:31 AM 26,555 20030529.htm 05/30/2003 04:11 AM 26,000 20030530.htm 05/31/2003 04:42 AM 26,271 20030531.htm 06/01/2003 04:55 AM 26,283 20030601.htm 06/02/2003 04:32 AM 25,902 20030602.htm 06/03/2003 04:28 AM 26,328 20030603.htm 06/04/2003 04:34 AM 26,050 20030604.htm 06/05/2003 04:52 AM 25,930 20030605.htm 06/06/2003 02:56 AM 26,120 20030606.htm 06/07/2003 04:13 AM 26,039 20030607.htm 06/08/2003 04:38 AM 26,543 20030608.htm 06/09/2003 03:58 AM 25,842 20030609.htm 06/10/2003 04:25 AM 26,395 20030610.htm 06/11/2003 04:41 AM 26,766 20030611.htm 06/12/2003 02:28 AM 25,933 20030612.htm 06/13/2003 04:19 AM 25,684 20030613.htm 06/14/2003 04:43 AM 25,960 20030614.htm 06/15/2003 05:20 AM 25,865 20030615.htm 06/16/2003 04:11 AM 25,771 20030616.htm 06/17/2003 04:03 AM 25,788 20030617.htm 06/18/2003 04:08 AM 25,825 20030618.htm 06/19/2003 03:28 AM 25,799 20030619.htm 06/20/2003 04:17 AM 25,711 20030620.htm 06/21/2003 03:32 AM 25,724 20030621.htm 06/23/2003 04:19 AM 25,889 20030623.htm 06/24/2003 04:15 AM 25,858 20030624.htm 06/25/2003 04:40 AM 26,048 20030625.htm 06/26/2003 04:05 AM 25,727 20030626.htm 06/27/2003 04:31 AM 25,705 20030627.htm 06/28/2003 04:07 AM 25,863 20030628.htm 06/29/2003 03:15 AM 25,805 20030629.htm 06/30/2003 04:23 AM 25,905 20030630.htm 07/01/2003 04:34 AM 25,884 20030701.htm 07/02/2003 04:38 AM 25,864 20030702.htm 07/03/2003 04:25 AM 25,912 20030703.htm 07/04/2003 04:34 AM 25,759 20030704.htm 07/05/2003 04:33 AM 25,878 20030705.htm 07/06/2003 04:34 AM 25,985 20030706.htm 07/07/2003 05:39 AM 25,852 20030707.htm 07/08/2003 05:31 AM 25,711 20030708.htm 07/09/2003 04:39 AM 25,579 20030709.htm 07/10/2003 04:30 AM 25,709 20030710.htm 07/11/2003 04:45 AM 25,538 20030711.htm 07/12/2003 04:10 AM 25,642 20030712.htm 07/13/2003 04:36 AM 25,819 20030713.htm 07/14/2003 04:07 AM 25,788 20030714.htm 07/15/2003 04:20 AM 25,612 20030715.htm 07/16/2003 06:48 AM 25,706 20030716.htm 07/17/2003 04:44 AM 25,709 20030717.htm 07/18/2003 04:24 AM 25,557 20030718.htm 07/19/2003 05:03 AM 25,671 20030719.htm 07/20/2003 04:45 AM 25,815 20030720.htm 07/21/2003 04:45 AM 25,992 20030721.htm 07/22/2003 03:33 AM 25,761 20030722.htm 07/23/2003 06:50 AM 25,847 20030723.htm 07/24/2003 06:32 AM 25,677 20030724.htm 07/26/2003 05:19 AM 25,884 20030725.htm 07/27/2003 05:20 AM 25,709 20030726.htm 07/28/2003 05:25 AM 25,661 20030727.htm 07/29/2003 05:09 AM 25,766 20030728.htm 07/30/2003 05:06 AM 25,594 20030729.htm 07/31/2003 05:02 AM 25,511 20030730.htm 08/01/2003 02:05 AM 25,552 20030801.htm 08/02/2003 04:25 AM 25,555 20030802.htm 08/03/2003 04:52 AM 25,544 20030803.htm 08/04/2003 04:59 AM 25,541 20030804.htm 08/05/2003 04:37 AM 25,617 20030805.htm 08/06/2003 03:45 AM 25,556 20030806.htm 08/07/2003 05:09 AM 25,442 20030807.htm Page 2 • CD2_epochJnudlogs_rpt_list.txt 08/08/2003 04:06 AM 25,489 20030808.htm 08/09/2003 04:58 AM 25,441 20030809.htm 94 File(s) 2,427,240 bytes Total Files Listed: 116 File(s) 53,186,250 bytes 21 Dir(s) 0 bytes free Page 3 i • CD1_logs_directional_list.txt volume in drive E is CDZ_DATA_CIE_1 volume serial Number is 92DA-E2B8 Directory of E:\ 05/01/2013 03:34 PM 1,544 CD1_DATA_CIE_Files.htm 04/20/2013 02:19 PM <DIR> DIRECTIONAL 06/25/2003 08:50 AM <DIR> LOGS 1 File(s) 1,544 bytes Directory of E:\DIRECTIONAL 04/20/2013 02:19 PM <DIR> 05/01/2013 03:34 PM <DIR> 04/20/2013 02:19 PM 3,612 ru4a_dirsurvey.csv 04/20/2013 02:19 PM 5,451 ru4a_dirsurvey.prn 04/20/2013 02:15 PM 4,450 ru4a_dirsurvey.txt 05/01/2013 02:53 PM 4,962,392 Ru4_4A.pdf 4 File(s) 4,975,905 bytes Directory of E:\LOGS 06/25/2003 08:50 AM <DIR> 05/01/2013 03:34 PM <DIR> 06/25/2003 08:50 AM 817,829 Caliper Combined.PDS 07/13/2003 05:01 PM <DIR> Forest_RU_4A_HSD_GUNS 07/11/2003 10:29 PM <DIR> Forest_RU_4A_USIT_CBL 06/29/2003 02:25 PM 1,418,831 Main Pass_4IT_TLD_MCFL_CNL_033PUP.las 06/29/2003 02:24 PM 308,880 Repeat SectionAIT_TLD_MCFL_CNL_035PUP.las 06/25/2003 08:33 AM 1,983,890 TCOMCombined.PDS 06/29/2003 02:26 PM 4,096 TCOMCombined.PDS.FMA 5 File(s) 4,533,526 bytes Directory of E:\LOGS\Forest_RU_4A_HSD_GUNS 07/13/2003 05:01 PM <DIR> 06/25/2003 08:50 AM <DIR> 07/13/2003 05:01 PM 249,993 so#10627759_RU4A_Combined.PDS 07/14/2003 12:00 PM 4,096 SO#10627759_RU4A_Combined.PDS.FMA 2 File(s) 254,089 bytes Directory of E:\LOGS\Forest_RU_4A_USIT_CBL 07/11/2003 10:29 PM <DIR> 06/25/2003 08:50 AM <DIR> 07/11/2003 10:29 PM 32,662,544 Downlog_USI_SONIC_028LDP.DLIS 07/12/2003 01:57 AM 131,520,792 Main_Pass_USI_SONIC_037PUP.DLIS 07/12/2003 02:22 AM 11,223,308 Repeat_USI_SONIC_039PUP.DLIS 07/12/2003 05:00 AM 11,497,943 so#10627758Redoubtunit4A_Combined.PDS 4 File(s) 186,904,587 bytes Total Files Listed: 16 File(s) 196,669,651 bytes 12 Dir(s) 0 bytes free Page 1 5/2/2013 Redoubt Unit#4A, API#50-733-20506-01 Logs List CONFIDENTIAL Vertical Bottom Log Top Log Data From: Log Date: Description Run# Scale Interval(feet) Interval(feet) Schlumberger 6/25/2003 Array Induction, Compensated Neutron,Three Dector Litho-Density; PEX; MD 1 2"&5" 17,514' 14,862' Schlumberger 6/25/2003 Array Induction, Compensated Neutron,Three Dector Litho-Density; PEX;TVD 1 5" 17,514' 14,862' Schlumberger 6/25/2003 Capliper Log 1 5" 17,514' 14,862' • Schlumberger 7/11/2003 UltraSonic Imager, Cement and Corrosion Mode, Cement Bond Log-VDL 1 5" 18,000' 14,626' Schlumberger 7/13/2003 Perforating Record, HSD 3 3/8"3406 PowerJet HMX 6 spf 1 5" 17,870' 17,500' • • Report Date: 5/1/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)OMB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 1 Days From Spud: 1 Daily Operation:4/30/2003 06:00-5/1/2003 05:59 Operations at Report Time Proposed Activity 24hrs P/U HT 40 DP TIH.SPOT 29 BBL CEMENT PLUG.TOH.L/D 2 7/8 Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas 1Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 BP NU BOPE 08:30 3.00 PT TEST BOP 250/3000. 11:30 0.50 RS Normal Rig service 12:00 2.00 PT TEST BOP 250/3000 PSI. 14:00 4.00 TB PULL TUBING HANGER.L/D 70 JTS 3 1/2 L-80 TUBING. 18:00 12.00 TR SET WEAR RING.P/U,STRAP,DRIFT 65 JTS 2 7/8.P/U 161 JTS HT 38.P/U HT 40 MUD PROPERTIES Mud Check Depth:15,000.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(ibf/100fE) IpH Gel(10sec)(Ibf/100(5) Gel(10min)(Ibf/100fg) KCL BRINE 8.701 261 WL(mU30min) HTHP(mL/30... Pm(mL/mL) Pf(mUmL) Mt(mIJmL) Filter Cake(1/32) Electric Stab(V)10(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) Sol(% Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) 1LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Noules(1/37) IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size/n) P Max(psi) Vol/Stk(bbltstk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 573.0 -573.0 SAFETY CHECKS-JSA Date Type Des Com 5/1/2003 Rams Test SURVEY DATA Date 1 MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I OLS('/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R 4111 S Report Date: 5/2/2003 4 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(kKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 2 Days From Spud: 2 Daily Operation:5/1/2003 06:00-5/2/2003 05:59 Operations at Report Time Proposed Activity 24hrs P/U SCRAPER. SCRAPE 7 5/8"CASING. Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile Email TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.50 TR P/U drill string.Tag bottom at 20047'. 13:30 1.50 CM Plug back with a balanced plug. 15:00 1.00 TR Pull out of plug to 18565'. 16:00 3.00 CC Reverse circulate.Trace of cement in returns. 19:00 1.00 RS Cut drilling line. 20:00 10.00 TR POH.Lay down 2 7/8"tools. MUD PROPERTIES Mud Check Depth:15,000.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100tP) pH Gel(10sec)(Ibf/100ft') I Gel(lomin)(11:0100(?)KCL BRINE 8.70 261 WL(mU30min) HTHP(mU30...IPm(mUmL) Pf(mUmL) I Mf(mUmL) Fitter Cake(1/32") ElecMC Stab(V) 0(%) I W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) ISd(%) LGS(%) Chl(mg/L) I CaCI(ppm) Ca(mg/L) I Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make I Model SN IADC Codes 'Depth In MB) Total Depth Odlled by Bit..,ICum no hrs...Total Avg RO... Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(k1) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spin) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS-JSA Date Type Des Corn 5/2/2003 BOP Drill SURVEY DATA Date I MD(ftKB) I Ina(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IDReport Date: 5/3/2003 ,A FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM P rea: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 3 Days From Spud: 3 Daily Operation:5/2/2003 06:00-5/3/2003 05:59 Operations at Report Time Proposed Activity 24hrs LINE UP TO DISPLACE DISPLACE WITH OBM. Remarks Mud Logging Summary Background Gas Connectrion Gas 'Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.00 TR RIH with 7 5/8"scraper to 15200'. 13:00 1.50 CC Circulate bottoms up.Max gas 590 units. 14:30 6.00 TR POH.Lay down scraper. 20:30 7.00 TR RIH with 7 5/8"Bridge plug. 03:30 0.50 TR Set bridge plug at 15080'. 04:00 1.00 RS Cut drilling line. 05:00 1.00 CC Rig to displace with oil base mud. MUD PROPERTIES Mud Check Depth:15,000.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/10011') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') KCL BRINE , 8.70 26 WL(mL/30min) HTHP(mL/30... Pm(mUmL) IPf(mL/mL) I Mf(mUmL) Filter Cake(1/32") 1 Electric Stab(V) O(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(Vol LGS(%) Chl(mg/L) CaCI(ppm) ICa(mg/L) lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make IModel SN I IADC Codes -Depth In(ftKB) Total Depth Dulled by Bit...Cum At hrs...Total Avg RO... Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vot/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS•JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) 1 VS(ft) I NS(ft) I EW(ft) I DLS(°1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0 .E S • Report Date: 5/4/2003 el FOREST OIL CORPORATION AFE&Cost Type:035541 6 lb o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(rorct) Grade (0KB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 4 Days From Spud: 4 Daily Operation:5/3/2003 06:00-5/4/2003 05:59 Operations at Report Time Proposed Activity 24hrs LAY DOWN EXCESS DRILL PIPE RUN 6 3/4"MILL.RUN WHIPSTOCK. Remarks Mud Logging Summary Background Gas Connecldon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 CC Rig to displace. 07:00 8.00 CC Pump sweeps and displace with 9.8#oil base mud. 15:00 4.00 TR POH. 19:00 1.50 RS Repair rig iron roughneck. 20:30 1.50 TR POH.Lost 8 bow springs from cement stinger. 22:00 8.00 TR Pick up HWDP,drill collars and BHA.Lay down 5100'of 3.5"HT-38 drill pipe. MUD PROPERTIES Mud Check Depth:15,000.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(F) pH Gel(losec)(Ibf/100(t) Gel(1 Ernie)(Ibf/100(H) VERSADRILL 9.70 140 21 23 21 27 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(rnllmL) Mf(mUmL) Fitter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 15.01 1 700.01 70.01 19.0178.7/21.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbp LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.0 0 1 1 0.61 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Rue Size(in) re- Model 'SN 1IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...'Cure Bit hrs.. Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(sprn) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des I Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) r VS(ft) I NS(ft) I EW(ft) I DLS(°/100%) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O E J- 111 • Report Date: 5/5/2003 k. A FOREST OIL CORPORATION AFE&Cost Type:035541 16 o t Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Dept, EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/.en(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 5 Days From Spud: 5 Daily Operation:5/4/2003 06:00-5/5/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH WITH WHIPSTOCK CUT WINDOW Remarks Mud Logging Summary Background Gas Connectrion Gas 'Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.50 TR Finish laying down 3.5"HT-38 drill pipe. 07:30 8.50 TR P/U 6 3/4"mill and 4500'of 4"HT-40 drill pipe.RIH. 16:00 1.50 TR Tag retainer at 15080'.No problems with junk.Pump dry job. 17:30 5.50 TR POH. 23:00 7.00 TR P/U whipstock.Orient to tool face.Pulse check MWD.RIH. MUD PROPERTIES Mud Check Depth:15,000.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(IM/100(f) pH Gel(1 Osec)(rof/t00R') Gel(10min)(Ibf/t 00R�) VERSADRILL 9.70 140 21 231 1 21 27 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 15.0 1 1 700.0 70.0 19.0178.7/21.3 MBT(Ib/bbl) 'Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.0 0 13 1.1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 1 Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...1Total Avg RO... Nozzles(1/32') IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) VollStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date MD(ftKB) I Ina(°) I Awe(°) I ND(ftKB) I VS(ft) ( NS(ft) I EW(ft) I DLS(°1100R) www.peloton.com Page 1/2 Report Printed: 7/31/2012 III • Report Date: 5/6/2003 ,�► FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ibft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): '6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 6 Days From Spud: 6 Daily Operation:5/5/2003 06:00-5/6/2003 05:59 Operations at Report Tune Proposed Activity 24hrs POH W/WINDOW MILLS. P/U DRILLING ASSEMBLY. Remarks Mud Logging Summary Background Gas ConnecMon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.00 TR RIH with whipstock. 13:00 1.50 DS Set whipstock at 47 degrees right.Top of wedge is at 15058'. 14:30 8.50 DS Mill out from 15058'to 15078'.Wash to 15102'. 23:00 2.50 CC Circulate and rotate above window working free of torque,drag and swabbing. 01:30 4.50 TR POH with window mills. MUD PROPERTIES Mud Check Depth:15,102.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH 'Geld Osec)(Ibf/100tt') Gel(10min)(Ibf/100ft') VERSADRILL 9.75 1171 23 251 1 18 26 WL(mL/30min) HTHP(mLJ30... Pm(mUmL) Pf(mlJrL) IAN(mL/mL) Filter Cake(1/32") 'Electric Stab(V) O(%) W)%) Oil Water Ratio 14.0 1 600.0 70.0 19.0 78.7/21.3 MBT(1b/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) 1 CaCI(ppm) Ca(mg/L) Lime(1b/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.0 0 17 1.1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes 1 Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") 'IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 III • Report Date: 5/7/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ibtft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 7 Days From Spud: 7 Daily Operation:5/6/2003 06:00-5/7/2003 05:59 Operations at Report Time I Proposed Activity 24hrs ATTEMPT KICK OFF. DRILL AHEAD. Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 TR Lay down whipstock mills. 08:30 2.00 TR Pick up kick off assembly.RIH to 1800'. 10:30 1.50 RS Lubricate rig.Cut drilling line. 12:00 4.00 TR RIH to window. 16:00 1.00 DS Orient tool face and position bit at bottom of window. 17:00 2.50 DR Time drill from 15072'. 19:30 1.50 RS Repair rig.Replace mud line shock hose. 21:00 9.00 DR Time drilling,attemt kick off. MUD PROPERTIES Mud Check Depth:15,102.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/1 DOW) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 9.75 120 24 31 17 24 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 14.01 635.0 69.01 20.0 77.5/22.5 MBT(lb/bbl) Sol(%) (%) LGS(%) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.01 Sd 0.0 1 Chi(mg/L) 0 15 1.11 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make I Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...I Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbSstk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Lou CONSUMABLES Supply Item Des I Consumed Cum On Lac Note FUEL 0.0 -573.0 1 SAFETY CHECKS-JSA Date Type Des Com 5/7/2003 BOP Test 5/7/2003 Rams Test Rams Presure:3000 5/7/2003 BOP Drill SURVEY DATA Date I MD(MO) I led(°) ( Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/1008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R. E •• Report Date: 5/8/2003 k FOREST OIL CORPORATION AFE&Cost Type:035541 o 1 , Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/B) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 8 Days From Spud: 8 Daily Operation:5/7/2003 06:00-5/8/2003 05:59 Operations at Report Time Proposed Activity 24hrs CLEAN WINDOW AREA SET KICK OFF PLUG Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 TR Time drilling to 15085'.Could not kick off. 08:30 7.50 TR POH with drilling assembly. 16:00 6.00 PT Test BOP. 22:00 6.00 TR RIH with 300'of 3.5"cement stinger. 04:00 2.00 TR Wash and work through window to 15168'.Clean debis from area. MUD PROPERTIES Mud Check Depth:15,102.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft.) pH Gel(10sec)(Ibf/100ft') Gel(10min)(IbttlDDft') VERSADRILL 9.90 97 24 30 18 25 WL(mL/3nmin) HTHP(mL/30... Pm(mL/mL) Pf(mL/mL) Mf(mL/mL) Finer Cake(1/32") Electric Stab(V) O)%) W(%) Oil Water Ratio 1 12.0 I 1 ( 550.0 67.5 21.0176.3/23.7 MBT(lb/bbl) Sol(%) Sd)%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.01 0.0 0 18 1 1.1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 1 Model SN IADC Codes Depth In(ftKB) 'Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(032") 1IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -573.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) 1 Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 5/9/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 • Daily Drilling Report Well Name:REDOUBT UNIT NA Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ft<B) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(kKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 9 Days From Spud: 9 Daily Operation:5/8/2003 06:00-5/9/2003 05:59 Operations at Report Time Proposed Activity 24hrs TIH W/6 3/4"BIT&KICK OFF ASSY. (DRILL CEMENT T/WINDOW.TIME DRILL/KICK OFF Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas Max Gas 9 P 1 DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 CC PULL UP INTO 7 5/8 LINER.ESTABLISH RT.CBU W/RT&RECIP. 09:00 4.50 CC WASH THROUGH WHIPSTOCK.WASH T/15,162.CBU.REV CIRC @ 15,050 13:30 1.00 CC TIH T/15,160.CIRC.TRANSFER MAPCO SPACER T/PILL PIT. 14:30 1.50 CM R/U T/CMT.PUMP 10 BBL MAPCO,4 BBL H2O.TEST LINES T/3,500.PUMP 5 BBL H20.PUMP 50 BBL 17# CMT.PUMP 5 BBL H2O.PUMP 3 BBL MAPCO.DISP W/160 BBL OBM @ 5 BPM WHILE HOLDING 800#BP ON CHOKE. 16:00 0.50 CM PULL 3 STDS SLOW.T/14880. 16:30 1.00 CC REV CIRC @ 5 BPM.@ BTM UP DUMP 65 BBL CONT.OBM&20 BBL 17#CMT. 17:30 2.00 TR TOH.T/13,950.PUMP DP WIPER DART.CIRC 2 DP VOLUMES @ 6.5 BPM.*SWAP RIG OVER TO CAT POWER. 19:30 6.00 TR TOH.L/D 10 JTS 3 1/2 DP. 01:30 2.00 TR MK UP BHA.SURFACE TEST MWD. 03:30 2.50 TR TIH W/KICK OFF ASSY. MUD PROPERTIES Mud Check Depth:15,102.0 kKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/1005') VERSADRILL 1 9.80 100 24 251 171 24 WL(mL/30min) HTHP(mL/30...1 Pm(ntUJmL) Pf(mL/mL) Mt(mL/mL) Fitter Cake(1/37) TElectric Stab(V) 0(%) W(%) Oil Water Ratio 12.0 I 550.0 67.0 22.0 75.3/24.7 MST(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(1b/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.01 0 17- 1.1 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 1 Model SN (ADC Codes Depth In(ft<B) Total Depth Drilled by Bit...Cum Bit hrs...l Total Avg RO... Nozzles(1/32") 1IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbEstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 888.0 -1,461.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Pam(°) I ND MKS) I VS(ft) I NS(ft) I EW(fl) I DLS(°/1008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 5/10/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 10 Days From Spud: 10 Daily Operation:5/9/2003 06:00-5/10/2003 05:59 Operations at Report Time Proposed Activity 24hrs CIRCULATE/SWEEP HOLE CLEAN WHILE RECIP/RT. TIME DRILL,CONFIRM KICK OFF.TOH F/PDC Remarks Mud Logging Summary Background Gas Connectrion Gas (Trip Gas 'Max Gas DAILY CONTACTS Job Content Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 TR RIH. Fill pipe @ 6,000'&12,300'. RIH U 13,900' 08:00 1.00 RS Service crown,drawworks&topdrive. Change saver sub. 09:00 1.00 TR PJSM. Cut and slip drilling line. 10:00 0.50 TR RIH U 14,574'. Establish circulation 10:30 0.50 DR Wash t/14,890'.Tag cement. 11:00 4.00 DC Drill cement f/14,890'U 15,050. 15:00 3.50 DR Circ hole. Orient 50-60 R. Slide f/15,050 t/15,067. 18:30 6.50 DR Slide. Time drilling f/15,067'U 15,085 01:00 5.00 DR Experiencing pack-off problems. Work tight hole. Pipe free @ 0600. Stand back one stand and prepare to pump sweep MUD PROPERTIES Mud Check Depth:15,102.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/1008) pH Gel(10sec)(Ibf/100(1') Gel(10min)(Ibf/100ft') VERSADRILL 9.90 130 26 42 211 28 WL(mL/30min) HTHP(mU30... Pm(mL/mL) Pt(mL/mL) Mf(mUmL) Filter Cake(t/32") 'Electric Sub(V)-O(%) W(%) Oil Water Ratio 12.0 500.0 66.0 23.0 74.2/25.8 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) 'Ca(mg/L) Lime(lb/bbl) (LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.0 0 14 1.1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..'Cum Bit hrs...'Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump it Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump It Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 2,664.0 -4,125.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Dale I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(H) I DLS(°11008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R yF • Report Date: 5/11/2003 s • A FOREST OIL CORPORATION AFE&Cost Type:035541 65 o L `- Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 11 Days From Spud: 11 Daily Operation:5/10/2003 06:00•5/11/2003 05:59 Operations at Report Time Proposed Activity 24hrs TIME DRLG @ 15112,2 MIN PER INCH.90%CMT RETURN CIRCULATE HOLE CLEAN,TOH.P/U 5"MTR&PDC BIT. Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 6.00 CC ESTABLISH RT&FULL CIRC.PUMP HIGH VIS SWEEP.RT&RECIP ABOVE WHIPSTOCK F/15,044 T/14,952 12:00 1.50 DR ORIENT @ 50 R&ATTEMPT T/WORK BHA INTO WINDOW.AFTER MULTIPLE ATTEMPTS,ENTER WINDOW @ 30 R. 13:30 4.75 DR TIME DRILL F/15,085 T/15,097 @ 2 MIN PER INCH,N/G. 18:15 3.00 DR TROUGH @ 15,097. 21:15 8.75 DR TIME DRILL T/15,112.3 MINI PER INCH.90%CEMENT,5%COAL,5%SAND RETURNS. MUD PROPERTIES Mud Check Depth:15,102.0 BKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100fN) pH Gel(t OSec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 9.80 139_1 25 39 21 26 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 14.0 1 500.0 66.0 23.0174.2/25.8 MBT(Ib/bbl) Sol(%) (%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.01 Sd 0.0 0 14 'Lime(lb/bbl) 1.1 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit..,'Cum Bit hrs...'Total Avg RD...'Nozzles(1/32") 'ADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spot) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 2,664.0 -6,789.0 SAFETY CHECKS•JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) ND(ftKB) I VS(ft) I NS(ft) I EW(fl) I DLS(°/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 it F O s • Report Date: 5/12/2003 • FOREST OIL CORPORATION AFE&Cost Type:035541 9 16 o l L Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW APIIUWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (1b/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 12 Days From Spud: 12 Daily Operation:5/11/2003 06:00-5/12/2003 05:59 Operations at Report Time Proposed Activity 24hrs ATTEMPT T/ENTER WHIPSTOCK. TOH.LAY 2ND KICK OFF PLUG. '.. Remarks Mud Logging Summary Background Gas 'Connection Gas Tdp Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Desodption OP 06:00 2.00 DR TIME DRILL T/ 15,112. 08:00 2.00 CC TOH ABOVE WHIPSTOCK T/14,944.PUMP HIGH VIS SWEEP&CIRC OUT.10%INC.IN CUTTINGS. 10:00 7.00 TR TOH. 17:00 1.50 TR C/O MUD MTR,MWD PROBE&BIT. 18:30 0.50 RS SERVICE RIG. 19:00 5.50 TR TIH.SHALLOW TEST MWD. 00:30 5.50 DR ESTABLISH CIRC.ORIENT TOOL FACE T/60 R.ATTEMPT T/ENTER WHIPSTOCK.N/G.USE BAKER PROCEDURES,ATTEMPTING T/ENTER WHIPSTOCK.N/G - MUD PROPERTIES Mud Check Depth:15,112.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fN) pH Gel(10sec)(Ibf/100ft') GeldOmin)(Ibf/100ft') VERSADRILL 9.801 160 33 30 21 28 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") 'Electrtc Stab(V) O(%) W(%) Oil Water Ratio 1 16.0 450.01 64.0 25.0171.9/28.1 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.01 0.0 0 13 1.11 _ BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) 'Make 'Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...rum Bit hrs..,Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump B Make Model Stroke(n) Liner Size(n) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump It Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des - Consumed On Lou CONSUMABLES Supply Item Des 1 Consumed Cum On Loc Note FUEL 888.0 -7,677.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) 1 Azm(°) r ND(ftKB) l VS(ft) I NS(ft) I EW(ft) I DLS(°/10W) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R E s Report Date: 5/13/2003 `� A FOREST OIL CORPORATION AFE&Cost Type:035541 q 16 o I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (RIO) (TVD)(5KB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 13 Days From Spud: 13 Daily Operation:5/12/2003 06:00-5/13/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/MULE SHOE. P/U MILL ASSY.TIH,DRILL CMT&KICK OFF. Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas I DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From FIRS.(hr) CODE SUB CODE Description OP 06:00 1.00 TR ATTEMPT T/ENTER WHIPSTOCK,USING BAKER PROCEDURES.N/G. 07:00 7.50 TR PUMP DRY JOB.TOH. 14:30 0.50 RS SERVICE RIG 15:00 5.00 TR P/U MULE SHOE&10 JTS 3 1/2 DP.TIH. 20:00 1.00 RS (TURBINE FLAME OUT)CUT&SLIP DRLG LINE. 21:00 3.50 TR WASH THRU WINDOW(SLICK)CIRCULATE&CONDITION MUD. 00:30 1.50 CM PJSM.PUMP 9 BBL MAPCO.PUMP 4 BBL H20.TEST LINES T/3,500 PSI.PUMP 5 BBL H20.PUMP 70 SKS, 12.3 BBL 17#CMT @ 0100.HOLD 1,000 PSI ON ANNULUS.PUMP 3 BBL H2O&3 BBL MAPCO.DISPLACE W/161 BBLS OBM.CMT IN PLACE @ 0200. 02:00 0.50 TR TOH T/14,722. 02:30 1.50 CC REVERSE CIRC @ 6 BPM.CIRC DP VOL,LONG WAY. 04:00 1.50 CM HOLD 2000 PSI ON ANNULUS.CMT BATCHED @ 0100. 05:30 0.50 TR PUMP DRY JOB.TOH MUD PROPERTIES Mud Check Depth:15,112.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100f/) pH Gel(10sec)(Ibf/100(B) !GeV Omin)(Ibf/100ft') VERSADRILL 9.80 160 24 35 181 28 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filer Cake(1/32") Electric Stab(V)Tom) W(%) Oil Water Ratio 1 16.0 1 ( 450.01 64.0 25.0 71.9/28.1 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 11.0 0.0 0 131 1.11 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...l Total Avg RO...I Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(M) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spin) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lee Note FUEL 592.0 -8,269.0 SAFETY CHECKS-JSA Date Type Des Corn 5/13/2003 Fire Drill SURVEY DATA Date I MD(ftKB) I Ind(°) I Pam(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/t00ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 5/14/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 14 Days From Spud: 14 Daily Operation:5/13/2003 06:00-5/14/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/MILL ASSY.900'@ REPORT TIME. TEST BOP.P/U MULE SHOE&3 1/2.TIH.CIRC.LAY CMT PLUG Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.50 TR TOH W/MULE SHOE.L/D 10 JTS 3 1/2 DP. 13:30 1.00 RS CLEAN RIG FLOOR&SERVICE RIG. 14:30 1.50 TR P/U BAKER MILLING BHA. 16:00 5.75 TR TIH.WASH F/14,723.CMT STRINGER @ 14,950.POLISH TOP OF SLIDE T/15,071. 21:45 1.75 CC CIRCULATE BTMS UP.APPROXIMATLY 1 BBL CMT RETURNS. 23:30 0.50 WR WORK MILLS THRU WINDOW.NO CEMENT. 00:00 2.50 CC PUMP DRY JOB.TOH. 02:30 0.50 RS REPAIR IRON ROUGHNECK. 03:00 3.00 TR TOH W/MILLING ASSY. MUD PROPERTIES Mud Check Depth:15,112.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/t00ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/t0011') VERSADRILL 10.00 160 25 30 18 21 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 18.0 I I 400.0 64.0 24.0172.7/27.3 MBT(Ib/bbl) Sal(%) Sd)%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) M Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.0 ' 0 12 1.1I"M BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes 'Depth In(RKB) Total Depth Drilled by Bit...Cum Bit hrs...'Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 444.0 -8,713.0 SAFETY CHECKS-JSA Date Type Des Com 5/14/2003 BOP Drill 5/14/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(RKB) I Ina(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) ( DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • P. 6$ IP • Report Date: 5/15/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 Is o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL LeaselOp Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WULen(Ibis) Grade (ftKB) (ND)(Ree) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 15 Days From Spud: 15 Daily Operation:5/14/2003 06:00-5/15/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/MULE SHOE. P/U MILLING ASSY.TIH.DRILL CMT&KICK OFF. Remarks Mud Logging Summary Background Gas 'Connection Gas 'Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile Email TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 TR Stand back BHA. Lay down mills. 07:00 5.00 PT Pull wear bushing.Test BOP.3000/250 12:00 0.50 TR PJSM. Pickup 10 joints of 3-1/2"drillpipe. 12:30 5.50 TR TIH 18:00 1.00 TR Cut and slip 175'of drilling line. 19:00 0.50 RS Lubricate rig. 19:30 0.50 TR Wash to bottom. Tag @ 15,085'. 20:00 2.00 CC Condition mud and circulate. 22:00 0.50 CC Reverse circulate 3000 strokes. 22:30 1.50 CM PJSM. Install head pin. Pres annulus to 2,000 psi f/10 minutes,76 psi loss.2 strokes to pressure back up to 2,000 psi. 00:00 2.50 CM PJSM. Pump 9 bbls.Mapco. Turn over to BJ. Pump 4 bbls.water. Test cement lines U 3,500 psi. Pump 5 barrels water;17.67 barrels of 17#Class G cement.Pump 3 barrels of water. Pump 3 barrels of Mapco.Displace w/ 160 barrels OBM. Cement in place @ 0110 hrs. P.O.O.H.U 14,798'and reverse circulate. 02:30 1.50 TR TOH t/14,450'. Circ long way. Circulate bottoms up. Mix and pump dry job. 04:00 2.00 TR TOH w/mule shoe. MUD PROPERTIES Mud Check Depth:15,085.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100R') pH Gel(10sec)(Ibf/Drift) Gel(lDmin)(Ibf/100f1") VERSADRILL 10.00 146 25 28 17 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mt(mUmL) Finer Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 19.4 1 366.0 64.0 24.0172.7/27.3 MBT(Ib/bbl) Sol(%) (%) LOS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbi) 12.01 Sd 0.2 0 13 1.3 Mud Check Depth:15,112.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(lomin)(Ibf/100ft') VERSADRILL 10.00 160 25 30 181 21 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Fitter Cake(1/32") Electric Stab(V) 0 1%) W(%) Oil Water Ratio 18.01 1 1 400.0 64.01 24.0172.7/27.3 MBT(Ib/bbl) Sd(%) LOS(%) CM(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 Sol(%) 12.01 0.0 0 12 'Lime(Ib/bbl) 1.11 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN 11ADC Codes Depth In(fteB) [Total Depth Drilled by Bit..'Cum Bit hrs...Total Avg RO... Nozzles(1132") !ADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/51k(bbl/stk) PUMP CHECKS Pump B Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 592.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(°) I Am'(°) I ND(ftKB) I VS(ft) ( NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R 8 • • Report Date: 5/16/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 iy o r ti Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (fine) (ND)(.1KB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 16 Days From Spud: 16 Daily Operation:5/15/2003 06:00-5/16/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRESSING CMT PLUG SIDETRACK Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.50 TR POH-LAY DN 10 JTS 3 1/2 DRILL PIPE&MULE SHOE 09:30 0.50 RS Normal rig service 10:00 0.50 TR M/U BAKER DRESSING ASS'Y(STARTER MILL-6 1/16",WATERMELLON MILL-6 3/16"&SIZING MILL-6 3/4") 10:30 4.50 TR RIH 15:00 6.00 DC 'TAG CMT AT 14805'-DRLG CMT W/10K WT AT 20 FPH FOR FIRST 50 FT-30 TO 40 FPH TO 15000' -40 TO 80 FPH TO 15040 21:00 3.50 DC CIR&COND MUD(WOC) 00:30 0.50 DC DRILL CMT TO 15047(SOFT) 01:00 5.00 DC CIR&WOC MUD PROPERTIES Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH 001(10sec)(Ibf/10of1') Gel(10min)(IM/100ft') VERSADRILL 9.90 1151 22 21 1 121 18 WL(mL/30min) 1 m HTHP(mU30... Pm(mUmL) Pf(mUL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 16.8 1 410.0 65.0 22.0 74.7/25.3 MBT(Ib/bbl) Sol(%) (%) LGS(%) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.01 Sd 0.2 1 Chi(mg/L) 0 12 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100(f) pH Gel)llsec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 1 9.901 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 16.81 m 410.0 65.0 22.0 74.7/25.3 MST(Ib/bbl) Sol(%) Sd(%) I LGS(%) Chl(mg/L) 'Gael(ppm) ICa(mg/L) Lime(Ib/bbl) I LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0 12 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...'Cum Bit hrs..,Total Avg RO.. Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Stow Spd MUD USAGE Des Consumed On Lou CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I InG(°) I Ann() I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS 01008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0 E s • • Report Date: 5/17/2003 H.,, FOREST OIL CORPORATION AFE&Cost Type:035541 0 I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(n) Wt/Len(lilt) Grade (ftKB) (TVD)(RKB) Run Date fib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 17 Days From Spud: 17 Daily Operation:5/16/2003 06:00-5/17/2003 05:59 Operations at Report Time Proposed Activity 24hrs WORKING STUCK PIPE AT 15074 FREE PIPE&SIDETRACK Remarks Mud Logging Summary Background Gas 'Connection Gas 'Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(M) CODE SUB CODE Description OP 06:00 3.00 DC DRLG CMT F/15047 TO 15082(TOOK NO WT TO DRLG) 09:00 1.50 TR CIR BTMS UP&PUMP DRY JOB 10:30 7.00 TR POH-LAY DN 7 DC'S BUMPER SUB.JARS&HWDP 17:30 1.00 TR P/U SIDETRACK BHA-ORIENT MTR I 18:30 5.00 TR RIH TO 15045 23:30 1.50 RS SERVICE RIG-CUT DRLG LINE-WHILE CIR HOLE 01:00 0.50 DS ORIENT BIT TO 60R-SLACK OFF TO 15072-CIR 80 BBL-PUMP PACKED OFF(UNABLE TO MOVE PIPE) 01:30 4.50 DS WORKING STUCK PIPE BIT AT 15074'(UNABLE TO ROTATE OR CIR) MUD PROPERTIES Mud Check Depth:15,038.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fF) pH Gel(10sec)(Ibf/100fF) Gel(10min)(IM/100fP) VERSADRILL 9.95 981 19 21 1 10 16 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 1 14.61 1 1 426.01 65.0 22.0174.7/25.3 MBT(Ib/bd) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cod(ppm) Ca(mg/L Lime(11)/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 13.0 0.2 1 01 12 1 2.01 1 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(up) rYP(Id/1001F) pH Gel(10sec)(Ibf/100fP) Gel(10mn)(Ibf/100fF) VERSADRILL 1 9.901 1151 22 21 1 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) P1(mL/mL) Mt(mUmL) Finer Cake(1/32") 11 Electric Stab(V) O(%) W(%) Oil Water Ratio 1 16.81 1 1 410.01 65.0 22.0 74. 7/25.3 MBT(Ib/bd) Sol(%) Sd(%) LOS(%) Chi(mg/L) Cad!(ppm) Ca(mg&) Lime(lb/bbl) LCM Mud Lost to Hole(NA) Mud Lost to Surface(bbl) 1 13.0 0.01 1 01 121 1 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) 'Make 'Model 'SN 1'ADC Codes 1Depth In(ftKB) 'Total Depth Drilled by Bk...1Cum Bit hrs...'Total Avg RO...'Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# I Make Model Stroke(in) Liner Size(in) I 1 P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) I P(psi) I Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type I Des Cent SURVEY DATA Date I MD(ftKB) I kid(°) I A'"") I TVD(Po(B) 1 VS(R) I NS(R) I EW(ft) I DLS 01008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 DR 6 • Report Date: 5/18/2003 k. ..4 FOREST OIL CORPORATION AFE&Cost Type:035541 16 o l `; Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 18 Days From Spud: 18 Daily Operation:5/17/2003 06:00-5/18/2003 05:59 Operations at Report Time Proposed Activity 24hrs POH W/FREE PIPE,AFTER BACK OFF AT 14984' FISH FOR REMAINING FISH Remarks Mud Logging Summary Background Gas 1Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 FS WORK STUCK PIPE(UNABLE TO CIR) 07:00 10.00 FS ESTABLISH CIR-WORK PIPE-PUMP 40 BBL SWEEP-WORK TORO DN HOLE-UNABLE TO FREE PIPE 17:00 8.50 SL R/U APRS-RIH W/STRING SHOT(PUMP TOOLS DN W/RIG PUMP) ATTEMPT BACK OFF AT 14984'(ONE DC ABOVE MWD) 01:30 2.00 SL POH W/SLICK LINE 03:30 2.50 TR POH W/FREE PIPE MUD PROPERTIES Mud Check Depth:15,074.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10000)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 9.90 98J 22 27 11 16 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(m m UmL) Mf(mUL) Fitter Cake(1/32) Electric Stab(V) O(%) W(%) Oil Water Ratio 1 16.8 494.0 67.0 21.0 76.1/23.9 MBT(Ib/bbl) Sol(%) 1Sd(%) I LGS(%) Chl(mg/L) 1CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) ILCM 'Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.2 0 12 1.8 Mud Check Depth:15,040.0 ftKB Mud Type FV(s/qt) PV Override(cp) t'P(Ibf/100ft') pH Gel(losec)(Ibf/100R') Gel(10min)(Ibf/100ft') VERSADRILL 1 MW(lb/gal) 9.90 115 22 21 12 18 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filer Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 1 16.8 1 410.0 65.0 22.0174.7/25.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 01 12 !Lime(Ib/bbl) 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 'Model SN IADC Codes Depth In(RKB) 'Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bM/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Los Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(RKB) I Ina(°) I Azm(°) ND(RKB) I VS(B) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 Q (t S s III • Report Date: 5/19/2003 `x. ,A FOREST OIL CORPORATION AFE&Cost Type:035541 19 16 o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IbRI) Grade (ftKB) (ND)(1KB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/ND: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ftlhr): Report Number: 19 Days From Spud: 19 Daily Operation:5/18/2003 06:00-5/19/2003 05:59 Operations at Report Time Proposed Activity 24hrs RUN IN HOLE W/STRING SHOT BACK OFF AT TOP OF MWD AT 15015 Remarks Mud Logging Summary Background Gas Connectrion Gas 'Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 6.50 TR POH-L/D 12 JTS 3 1/2 HWDP,3 MONEL DC'S 12:30 0.50 RS NORMAL RIG SERVICE 13:00 1.50 Fl M/U SCREW IN SUB-BUMPER SUB-BOWEN JARS-12 DC'S&ACC JARS 14:30 4.00 TR RIH TO 13900 18:30 1.00 RS SLIP&CUT DRLG LINE 19:30 1.00 TR RIH TO JUST ABOVE FISH AT 14984 I 20:30 6.00 Fl SCREW INTO FISH AT 14984-WORK&JAR IN ATTEMPT TO FREE FISH(UNABLE TO CIR THRU FISH) II MADE NO PROGRESS 02:30 3.50 SL RIG UP APRS-M/U STRING SHOT-RIH TO ATTEMPT BACK OFF AT 15015(TOP OF MWD) 1I MUD PROPERTIES Mud Check Depth:14,980.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fo) pH Gel(10sec)(1 1/100ft) Gel(10min)(Ibf/100fl') VERSADRILL I 9.90 128 21 27 ' 12 18 WL(inL/3oinin) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mL/mL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 17.2 406.0 67.0 21.0 76.1/23.9 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) I Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.2 0 12 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(ep) YP(Ibf/100f') pH Gel(10sec)(Ibf/100ft') Gel(i Ornin)(Ibf/100ft') VERSADRILL 9.90 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mL/mL) Pf(mUmL) Mf(mUmL) I rFilter Cake(1132") 1 Electric Stab(V) 0(%) W(%) Oil Water Ratio 16.8 I 410.0 65.0 22.0 74.7/25.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbi) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0 12 J 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes Depth In(11KB) Total Depth Drilled by Bit...Cum Bit Ers...1botai Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(In) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS - Pump# Strokes(spin) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Leo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I led(°) I An(°) I ND(ftKB) I VS(ft) I NS(fl) I EW(fl) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 Report Date: 5/20/2003 ,, , 111 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (RKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 'x.. Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(fUhr): Report Number: 20 Days From Spud: 20 Daily Operation:5/19/2003 06:00-5/20/2003 05:59 Operations at Report Time Proposed Activity 24hrs MILLING SECTION AT 14821 MILL SCTION&LAY CMT PLUG Remarks Mud Logging Summary Background Gas Conneclrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 Fl RIH W/APRS STRING SHOT-UNABLE TO GET PAST TOP OF FISH W/STRING SHOT 09:00 1.00 Fl WORK DN 10 TURNS TO LEFT-FIRE STRING SHOT AT 14984-PICK UP CONFIRM BACK OFF 10:00 3.00 Fl POH W/WIRE LINE&RIG DN APRS 13:00 0.50 RS Normal Rig service 13:30 7.50 TR PUMP DRY JOB-POH-L/D BHA(BACKED OFF AT TOP OF SCREW-IN SUB LEAVING SCREW-IN SUB IN HOLE-TOP OF FISH 14981.48) 21:00 7.50 TR M/U SECTION MILL&BHA-RIH TO 14820'(SLM NO CORRECTION) 04:30 1.50 DS MILL SECTION-APPEAR TO HAVE KNIVES THROUGH CASING AT 14820' MUD PROPERTIES Mud Check Depth:15,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(l Dsec)(Ibf/100ft') Gel(10min)(Ibf/100R') VERSADRILL 10.10 130 24 23 12 19 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") -Electric Stab WI 0(%) W(%) Oil Water Ratio 17.8 I 388.0 66.0 21.0 75.9/24.1 MBT(Ib/bbl) Sol(% Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hale(bbl) Mud Lost to Surface(bbl) I 13.0 0.2 I 0 12 I 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/10011') H Gel(l Osec)(Ibf/100R') Gel(lomin)(Ibf/10011') VERSADRILL 9.90 p 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Rano 16.8 I 410.0 65.0 22.0 74.7/25.3 MST(Ib/bbl) I Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Last to Surface(bbl) 13.0 0.0 0 12 I 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN IIADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bblstk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Leo Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) 1 Awn(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(R) I DLS(°!10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 5/21/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Leasel0 Area: CASING PROGRAM P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 21 Days From Spud: 21 Daily Operation:5/20/2003 06:00-5/21/2003 05:59 Operations at Report Time I Proposed Activity 24hrs CONTINUE TO MILL SECTION AT 14857 FINISH MILLING SECTION&LAY CMT PLUG Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From FIRS.(hr) CODE SUB CODE Description OP li 06:00 3.00 DS MILL SECTION F/14821 TO 14832-PUMP SWEEP W/NO INCREASE IN CUTTINGS TO SURFACE 09:00 7.00 DS MILL SECTION F/14832 TO 14842-PUMP 3 HI VIS SWEEPS(HI PUMP PRESSURE HI TORQ 16:00 5.00 CC CIR&WORK TIGHT HOLE&PACK OFF 21:00 5.50 DS MILL F/14842 TO 14852-CIR SWEEPS-HI TORQ&PUMP PRESSURE 02:30 3.50 DS MILL F/14852 TO 14857-PUMPING SWEEPS MUD PROPERTIES Mud Check Depth:14,851.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(10sed(Ibf/100(1') Gel(10min)(Ibf/100(') VERSADRILL I 10.10 1301 22 36 14 24 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) MI(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 16.4 I I 365.0 64.0 22.0 74.4/25.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(Ti) Chl(mg/L) CaCI(ppm) Ca(mgt) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.0 0.2 0 11 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) TV Override(cp) VP(lbf/100ft') pH Gel(10sec)(Ibf/100(1') Gel(lomin)(Ibf/100ft') VERSADRILL I 9.90 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electrc Stab(V) O(%) W(%) Oil Water Ratio 16.8 I 410.0 65.0 22.0 74.7/25.3 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) I ChI(mg/L) CaCI(ppm) Ca(mg/L) Lime(1b/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0 12 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make I Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..I Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(') I Az"'('1 I TVD((KB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100(1) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R,F s S 5 Report Date: 5/22/2003 k A FOREST OIL CORPORATION AFE&Cost Type:035541 o L N. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/en(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 22 Days From Spud: 22 Daily Operation:5/21/2003 06:00-5/22/2003 05:59 Operations at Report Time Proposed Activity 24hrs L/D 7 5/8 SECTION MILL&BHA LAY KICK-OFF PLUG ACROSS WINDOW Remarks Mud Logging Summary Background Gas I Connectdon Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 9.50 DS MILL SECTION F/14857 TO 14878-CONTINUE PUMPING HI-VIS SWEEPS 15:30 7.00 CC CIR HI-VIS SWEEPS UNTIL HOLE CLEAN 22:30 5.50 TR PUMP DRY JOB-POH 04:00 2.00 TR LAY DN SECTION MILL&4 3/4"DC'S MUD PROPERTIES Mud Check Depth:14,878.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 1 10.15 136 25 37 18 27 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) IAN(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 17.6 1 I 492.01 64.5 22.0 74.6/25.4 MBT(lb/bbl) Sol(%) (%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbi) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.51 Sd 0.2 0 11 2.0 1 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(t) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 9.90 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) MI(mUmL) filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 1 16.8 1 410.01 65.0 22.0 74.7/25.3 MBT(lb/6bl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lest to Surface(bbl) 13.0 0.0 0 12 1 2.01 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(M) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...I Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(ki) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump It Strokes(spm) P(psi) Elf(%) Slow Spd MUD USAGE Des Consumed On Leo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 -9,305.0 SAFETY CHECKS-JSA Date I Type Des Com SURVEY DATA Date ( MD(ftKB) I led(°) I Azm(°) I ND(ftKB) r VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 o ik 8 s • • Report Date: 5/23/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 16 o l `, Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/t) Grade (SKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 23 Days From Spud: 23 Daily Operation:5/22/2003 06:00-5/2312003 05:59 Operations at Report Time Proposed Activity 24hrs TEST BOP I P/U DRLG ASSY,TIH.DRILL CMT/CIRCULATE.KICK OFF PLUG. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 RS SERVICE RIG. 06:30 2.50 TR P/U MULE SHOE&10 JTS 3 1/2 DP.TIH T/7 5/8 LT. 09:00 0.50 CC CIRC @ 7 5/8 LINER TOP. 09:30 3.25 TR TIH T/14,815. 12:45 1.00 RS SLIP/CUT DRLG LINE. 13:45 0.75 WR WASH IN.TAG TOF @ 14,984.P/U T/14,974 14:30 1.50 CC CBU 16:00 1.00 PT PRES TEST FORMATION T/1,500 PSI.140 PSI LOSS IN 10 MIN.1/2 BBL T/PRES BK UP. 17:00 1.75 CM PUMP 10 BBL MAPCO SPACER,4 BBL H2O.TEST LINES T/3500 PSI.PUMP 47 BBL 17#SLURRY W/ HEMATITE.PUMP 3 BBL H2O&3 BBL MAPCO.DISPLACE W/ 153 BBL OBM. 18:45 0.50 TR TOH T/14,520.(300'ABOVE TOP OF WINDOW) 19:15 3.00 CC REV CIRC 22:15 1.75 TR TOH T/14,073.CIRC DP VOL.PUMP DRY JOB. 00:00 0.50 RR TURBINE FLAME OUT ON SHORE. 00:30 5.50 TR TOH.L/D 10 JTS 3 1/2 DP. MUD PROPERTIES Mud Check Depth:14,053.0 ftKB Mud Type MW(1b/gal) FV(s/qt) PV Override(cp) VP(Ibf/10off) pH Gel(10sec)(Ibf/100(') Gel(10min)(Ibf/100ft') VERSADRILL ( 10.30 132 25 33 15 23 WL(mL/3omin) HTHP(mL/30... Pm(mUmL) Mf(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 16.8 I Pt(mUmL) I U 546.0 65.0 21.0 75.6/24.4 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(rng/L) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.0 0.2 I 0I CaCI(ppm) 11 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100(f) pH Gel(10sec)(Ibf/100(t') I Gel(10min)(Ibf/100(P) VERSADRILL I 9.90 115 22 21 121 18 WL(mL/3omin) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio I 16.8 I 410.0 65.0 22.0 74.7/25.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0I CaCI(ppm) 12 I 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make I Model SN I IADC Codes Depth In(5KB) Total Depth Drilled by Bit...Cum Bit hrs...'Total Avg RO... Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) VoEStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Leo Note FUEL 264.0 -9,569.0 SAFETY CHECKS•JSA Date Type Des Com 5/23/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftK13) I Ind(°) I Azm(°) I Coo(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R £s S 5 Report Date: 5/24/2003 1 FOREST OIL CORPORATION AFE&Cost Type:035541 16 o l 4 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 24 Days From Spud: 24 Daily Operation:5/23/2003 06:00-5/24/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH F/PLUGGED JETS/MWD UNPLUG JETS/MWD.TIH Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.50 PT TEST BOPE 250/3,000 PSI. 10:30 3.50 TR M/U BHA.1.50 DEG BEND.P/U 18 JTS HWDP DRIFT&HAMMER.(HEAVY SCALE BUILD UP)SHALLOW TEST MWD. 14:00 4.50 TR DRIFT 1ST 10 STDS HT 40 FOR POSSIBLE CMT)FILL DP&CHECK PULSE @ 5,000,8350&13,600. 18:30 1.00 CC CIRCULATE&SHEAR MUD @ 220 GPM.CHECK PULSE. 19:30 0.50 TR TIH.TAG CMT STRINGER @ 14,175.P/U BRK CIRC&EST.RT.DRILL CMT T/14,178.2-3 K BIT WT. PACKING OFF OVER 30 SPM.PARTIAL PLUGGING OFF OF JETS. 20:00 5.00 CC P/U T/14,072.SHEAR/CONDITION MUD.LOWER MW F/10.3+T/10.0 PPG.VIS DN T/160. PACKING OFF OVER 30 SPM,PARTIAL PLUGGING OF JETS. 01:00 5.00 TR TOH/WET F/ PARTIALLY PLUGGED JETS/MWD. MUD PROPERTIES Mud Check Depth:14,108.0 ftKB Mud Type I MW(lb/gal) I FV(s/qt) PV Override(cp) YP(Ibf/100ft') IpH Gel(10sec)(Ibf/100R1) Gel(10min)(Ibf/10O1t1) VERSADRILL 9.901 160 25 22 11 17 WL(mL/30min) HTHP(mL/30... Pm(mUmL) U Pf(mmL) Mr(mUmL) Fitter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 16.2 I 605.0 67.0 21.0 76.1/23.9 I' MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) Chi(mg/L) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.2 I 0I CaCI(ppm) 11 2.0 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(lOsec)(Ibf/100ft1) Gel(10min)(Ibf/100ft1) VERSADRILL I 9.90 115 22 21 12 18 WL(mL/30min) HTHP(mc30... Pm(mUmL) Pf(mUmL) Mr(mUmL) Fitter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 16.8 I 410.0 65.0 22.0 74.7/25.3 MBT(lb/bbl) I Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 13.0 0.0 I 0 12 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make I Model Stroke(in) Liner Size(in) P Max(psi) Vd/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 740.0 - 10,309.0 SAFETY CHECKS-JSA Date TWO Des Corn SURVEY DATA Date I MD(ftKB) I nod(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IIIReport Date: 5/25/2003 A► FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD/n) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 25 Days From Spud: 25 Daily Operation:5/24/2003 06:00-5/25/2003 05:59 Operations at Report Time Proposed Activity 241tis TIH.8,600'@ REPORT TIME. DRILL CEMENT.CIRCULATE HOLE CLEAN.KICKOFF. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 TR TOH(WET)FOR PLUGGED JETS/MWD. 08:00 4.00 TR CLEAN OUT CEMENT F/MWD.STD BK BHA.TIH 27 STDS 4"HT DP HAMMER TOOL JTS.ON HT 40 12:00 0.50 RS SERVICE RIG. 12:30 1.50'TR TIH.38 STDS TOTAL HT 40,HAMMER TOOL JTS.RECOVER 4 GAL CMT F/TOOL JTS. 14:00 5.50 TR BRK CIRC.INTERNAL PK OFF.TOH(WET)CULLING HT DP. 19:30 3.50 TR TIH 20 STDS W/3 1/2 XO TRAP.HAMMER TOOL JTS.BRK CIRC.FULL CIRCULATION.TOH. 23:00 2.00 TR P/U KICK OFF BHA W/1.50 BEND.SHALLOW TEST MWD. 01:00 3.00 TR P/U HT 40.TIH 04:00 0.50 CC CIRC 2 DP VOL.TEST MWD @ 4460'. 04:30 1.50 TR TIH W/KICK OFF BHA.TEST MWD @ 8630.GOOD PULSE. MUD PROPERTIES Mud Check Depth:14,167.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(op) VP(Ibf/100/') pH Gel(10sed)(Ibf/100f1F) Gel(10min)(Ibf/10010) VERSADRILL 1 10.001 119 25 311 15 22 WL(mU30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) 'Mt(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 U 17.2 1 496.0 67.0 21.0 76.1/23.9 MBT(Ib/bbl) Sol(%) I LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.01 Sd I 0.2 0 11 1.8 Mud Check Depth:15,040.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(1 Dsec)(I11/100/') I Gel(10min)(Ibf/100/') VERSADRILL 9.90 115 22 21 121 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 16.81 410.0 65.0 22.0 74.7/25.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Last to Surface(bbl) 13.0 0.0 'Chi(mg/L) 0 12 2.0 - BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbEstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Rem Des Consumed Cum On Loc Note FUEL 592.0 - 10,901.0 SAFETY CHECKS-JSA Date Type Des Coon SURVEY DATA Date I MD(ftKB) I led(') I Azm(°) I ND(ftKB) I VS(ft) I NS(R) I EW(ft) I DLS(°/100/) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 5/26/2003 , , , FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ibkt) Grade (ftKB) (ND)(kKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 26 Days From Spud: 26 Daily Operation:5/25/2003 06:00-5/26/2003 05:59 Operations at Report Time Proposed Activity 24hrs TIME DRILLING CIRC SAMPLES LOOKING F/FORMATION.POSSIBLE TOH. Remarks Mud Logging Summary Background Gas Connedrion Gas Trip Gas Mae Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 CC CIRC 2 DP VOLUMES.PIPE CLEAR. 07:00 2.00 TR TIH&RATTLE DP T/13,500'. 09:00 0.50 CC CIRC/SHEAR DP VOL. 09:30 2.50 WR WASH&ROTATE F/14,165 T/14,634.SMALL STRINGER @ 14,200&14,438. 12:00 1.50 DC TAG CEMENT @ 14,595.RT DRILL T/14,730.(WOB 8-10 K) 13:30 2.50 CC PUMP HIGH VIS SWEEP.RT&RECIP.GOOD AMOUNT OF CMT RETURNS. 16:00 1.00 DC SLIDE 14,730-14,820.(TOP OF WINDOW) 17:00 13.00 DC ORIENT 160-180R.TIME DRILL F/14,820 T/14,840.5%FORATION IN SAMPLES. MUD PROPERTIES Mud Check Depth:14,826.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH GeldOsec)(Ibf/100k') Gel(10min)(IbE100ft') VERSADRILL 9.80 124 25 28 12 21 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mIJmL) Mf(mUrnL) Filter Cake(1/32") —Electric Stab(V) O(%) W(%) Oil Water Ratio 16.61 1 528.0 66.0 22.0 75/25 MBT)lb/bbl) Sol(%) ISd(%) ,LGS(%) IChI(mg/L) Cad'(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 12.0 0.2 0 11 1.6 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/1 Dole) pH !Geld Dsec)(Ibf/100(') !Geld 0min)(Ibf/100(0) VERSADRILL 9.90 1151 22 21 121 18 WL(mL/30min) HTHP(mLI30... Pm(mL/mL) Pt(mIJmL) Mf(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 1 18.81 I 410.0 65.0 22.0 74.7/25.3 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 01 12 'Lime(Ib/bbl) 2.0 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(113r) ',ADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(slam) P(psi) Elf(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On[cc Note FUEL 524.0 - 11,425.0 SAFETY CHECKS-JSA Date Type Des Com 5/26/2003 BOP Drill 5/26/2003 Fire Drill - SURVEY DATA Date I MD(ftKB) I Ind(°) 1 Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) 1 EW(k) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 . Report Date: 5/27/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 27 Days From Spud: 27 Daily Operation:5/26/2003 06:00-5/27/2003 05:59 Operations at Report Time Proposed Activity 24hrs TIME DRILLING/KICKING OFF. TIME DRILL,VERIFY KICK OFF W/SAMPLES.TOH F/DRLG ASY Remarks Mud Logging Summary Background Gas Connection Gas 'Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 DC TIME DRILLING 2 MPI T/14,844. 07:00 3.00 CC CIRCULATE HIGH VIS SWEEP.5%SAND IN SAMPLES. 10:00 5.50 TR PUMP DRY JOB.TOH. 15:30 2.50 TR P/U 5"MOTOR,SET @ 2 DEG.M/U BIT,ORIENT MWD.SHALLOW TEST.CLEAN RIG FLOOR. 18:00 5.50 TR TIH T/14,800'.BRK CIRC&ORIENT T/175R SLIDE OUT WINDOW T/14,825. 23:30 0.50 TR Tripping-BHA work 00:00 1.50 RS CUT DRLG LINE,SERVICE RIG&C/O SAVER SUB. 01:30 1.50 DR TROUGH F/14,825 T/14,844. 03:00 3.00 DR TIME DRILL F/14,844 T/14,850. MUD PROPERTIES Mud Check Depth:14,844.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(') pH Gel(10sec)(Ibf/100(1') Gel(10min)(Ibf/100(') VERSADRILL 10.10 197 27 36 16 24 WL(mL/30min)I HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/321 Electric Stab(V) O(%) W(%) Oil Water Ratio 17.0 510.0 65.0 22.0174.7/25.3 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ib/Fbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0J 0.2 0 10 1.6 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(P) Gel(10sec)(Ibf/100ft) Gel(10min)(Ibal Dots) VERSADRILL 9.90 115 22 21 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32') Electric Stab(VI O 1%) W(%) Oil Water Ratio 16.8 I J 410.0 65.0 22.0 74.7/25.3 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0 12 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN (ADC Codes I Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...(Total Avg RO... Nozzles(1/32°) IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump B Strokes(spm) P(psi) Eff(%( Stow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed, On Loc Note FUEL 592. - 12,017.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I NO(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R O F s • • Report Date: 5/28/2003 k" A FOREST OIL CORPORATION AFE&Cost Type:035541 ni 16 ol c Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 28 Days From Spud: 28 Daily Operation:5/27/2003 06:00-5/28/2003 05:59 Operations at Report Time Proposed Activity 24hrs TIH W/DRILLING BHA.9,500'@ REPORT TIME. SHEAR MUD @ WINDOW.DRILL/SLIDE AHEAD. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.00 DR TIME DRILL T/14,885.35%SAND IN SAMPLES.PUMP SWEEP @ 14,876. 13:00 1.50 CC CIRCULATE OUT SWEEP WHILE RECIP.50%SAND IN SAMPLES. 14:30 3.00 TR TOH.TIGHT&PACKING OFF @ 14,770.WORK PIPE,EST CIRC. 17:30 1.00 TR PUMP OUT T/13,508.ATTEMPT T/PK OFF. 18:30 1.50 CC CBU @ 315 GPM&RECIP 13,508-13,412. 20:00 5.00 TR PULL 10 STDS SLICK.PUMP DRY JOB.TOH. 01:00 2.00 TR M/U BHA.1.5 DEG BEND ON MTR.SHALLOW TEST. 03:00 3.00 TR TIH.FILL PIPE @ 5,000&9,000'. MUD PROPERTIES Mud Check Depth:14,885.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel)losec)(Ibf/100ft) Gel(10min)(Ibf/100ft') VERSADRILL 9.90 134 25 35 13 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pb(mUmL) Mf(mUmL) Fitter Cake(1/32") `Electric Stab(V) 0(%) W(%) Oil Water Ratio 17.8 I 1 550.0 65.0 23.0173.9/26.1 MBT(Ib/bbl) Sol(%) Sd(%) LOS(%) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Last to Surface(bbl) 12.0 0.21 1 Chl(mg/L ) CaCI(ppm)01 10 2.0 I 1 Mud Check Depth:15,040.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(lbf/10oft') pH Gel(10min)(1511100ft') VERSADRILL 9.90 115 22 211 1 Gel( 10sec)(Ibf/100ft') 12 18 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) MI(mUmL) liter Cake(1/32'3 Electric Stab(V)10(%) W(%) Oil Water Ratio 16.8 410.0 65.0 22.0 74.7/25.3 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.0 0 12 2.0 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) 'Make Model SN 11ADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit.. Cum Bit hrs...Total Avg RO.., Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke cm) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 444.0 - 12,461.0 SAFETY CHECKS-JSA Date Type Des I Corn SURVEY DATA Date I MD(ftKB) I led(') I Azm 1') I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O E s • Report Date: 5/29/2003 • k - FOREST OIL CORPORATION AFE&Cost Type:035541 "3 M1,6 a l Daily Drilling Report t. Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(Ib/fl) Grade ((KB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 29 Days From Spud: 29 Daily Operation:5/28/2003 06:00-5/29/2003 05:59 Operations at Report Time I Proposed Activity 24hrs DRILLING AHEAD DRILL/SLIDE DROPPING ANGLE&TURNING. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas 'Mae Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 TR TIH W/DRLG ASSY,1.5 DEG BEND. 08:00 2.00 CC CIRCULATE&SHEAR MUD.@ 14,800. 10:00 2.00 WR WASH T/BTM.CLN OUT F/14,820 T/BTM ORIENT 140R WORK T/14,885 12:00 8.00 DR SLIDE F/14,885-14,930.WORK SLIDE.TIGHT&PACKING OFF.REAM F/14,893-14,923. 20:00 2.00 DR DRILL/RT F/14,923-14,952. 22:00 8.00 DR SLIDE F/14,952 T/14,999 MUD PROPERTIES Mud Check Depth:14,963.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/t Dot?') pH Gel(10ses)(Ibf/100f') Gel(10mie)(Ibf/100ft) VERSADRILL 1 10.00 135 28 391 19 24 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V)[0(%) W(%) Oil Water Ratio 10.41 500. 01 62.5 25.0171.4/28.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) 'Mud Lost to Surface(bbl) 12.5 0.01 01 CaCI (ppm) 12 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN 1IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32') IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size/n) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Leo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 444.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind('I I Azm(') I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 5/30/2003 4fik FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wy/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 30 Days From Spud: 30 Daily Operation:5/29/2003 06:00-5/30/2003 05:59 Operations at Report Thee Proposed Activity 24brs DRILL AHEAD DRILL AHEAD Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 CC Circulate,rotate and reciprocate for hole cleaning at 14999'. 07:00 17.50 DR Drill form 14999'to 15182'. 00:30 1.00 CC Circulate,rotate and reciprocate for hole cleaning at 15182'. 01:30 4.50 DR Drill to 15224' MUD PROPERTIES Mud Check Depth:15,182.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(losec)(Ibf/10011') Gel(10min)(Ibf/10oft') VERSADRILL I 9,841.00 170 32 48 23 28 WL(mLl3omin)I HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/37) -Electric Stab(V) 0(%) W(%) Oil Water Ratio 9.6 375.0 63.0 24.5 72/28 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) CE(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 I 01 14 1.01 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) IMake I Model ISN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit.. Cum Bit hrs...Total Avg RO... Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model _ Stroke(m) Liner Size(in) P Max(psi) VeEStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Lou CONSUMABLES Supply Item Des Consumed Cum On lac Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(RKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • a E s el IP Report Date: 5/31/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 16 o l N. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 31 Days From Spud: 31 Daily Operation:5/30/2003 06:00-5/31/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILL AHEAD DRILL AHEAD Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE i Description OP 06:00 4.50 DR Drill form 15224'to 15293'. 10:30 3.00 CC Circulate and short trip.Hole in good shape. 13:30 1.50 DR Drill from 15293'to 15319'. 15:00 1.00 TR Jar pipe free at 15319'. 16:00 14.00 DR Drill to 15435'. MUD PROPERTIES Mud Check Depth:15,408.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH GeldOsec)(@11100th) Gel(10min)(Ibf/100ft') VERSADRILL I 9.80 135 28 35 I 20 25 WL(mL/30min) I HTHP(mL/30... Pm(mL/mL) Pt(mUmL) Mf(mL/mL) Fitter Cake(1/32") -Electric Stab(V) O(%) W(% Oil Water Ratio 8.0 I r 400.0 66.0 22.0 75/25 MBT(Ib/bhl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(15/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.0 0 16 I 1.5 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run(size(in) Make Model SN IIADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Dale Type I Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) 1 Ann(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0 • Report Date: 6/1/2003 ,A FOREST OIL CORPORATION AFEB Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) WI/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 32 Days From Spud: 32 Daily Operation:5/31/2003 06:00-6/1/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILL AT 15732'. DRILL AHEAD Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.00 DR 'Drill from 15435'to 15482'. 10:00 1.50 CC Circulate,rotate and reciprocate for hole cleaning. 11:30 18.50 DR Drill from 15482'to 15732'. MUD PROPERTIES Mud Check Depth:15,722.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100f1') pH Gel(lOsec)(Ibf/100R') GeldOmin)(Ibf/100ft') VERSADRILL 1 9.801 117 24 34 1 19 24 WL(mL/30min) I HTHP(mL/30...I Pm(mUmL) P/(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 6.0 400.0 67.0 21.0 76.1/23.9 MBT(Ib/bbl) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mod Lost to Surface(bbl) 1 Sol(%) 12.0 0.0 0 17 1 Lime(Ib/bbl) pod BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump tt Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 12,905.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°J100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 •4,.. Report Date: 6/2/2003 ° sh FOREST OIL CORPORATION AFE&Cost Type:035541 RS © l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 33 Days From Spud: 33 Daily Operation:6/1/2003 06:00-6/2/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH WITH BIT#9. DRILL AHEAD. Remarks Mud Logging Summary Background Gas I Connectrion Gas 'Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 DR Drill from 15732'to 15745'. 09:00 3.00 CC Circulate the hole clean. 12:00 7.50 TR POH with bit#8. 19:30 5.50 PT Test BOP.AOGCC waived witness. 01:00 5.00 TR RIH with bit#9. MUD PROPERTIES Mud Check Depth:15,745.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gehl Ssec)(1b1/100R') GeldOmin)(Ibf/l00ft') VERSADRILL 9.80 117 28 31 18 23 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 4.0 I 400.0 67.0 21.0 76.1/23.9 MBT(lb/bbl) Sol(%) (%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.01 Sd 0.0 0 17 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes IDepth In(ftKB) 'Total Depth Drilled by Bit...Cum Bit hrs.. Total Avg RO...'Nozzles(1/321) IADC Bit Dull PUMP OPERATIONS Pump# Make Model _ Stroke(in) Liner Size(in) P Max(psi) VoUStk(bbUstk) PUMP CHECKS Pump# Shakes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Corn 6/2/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(10005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 6/3/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/it) Grade (RKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 34 Days From Spud: 34 Daily Operation:6/2/2003 06:00-6/3/2003 05:59 Operations at Report Tee Proposed Activity 24hrs DRILL AHEAD DRILL AHEAD Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 TR RIH with bit#9. 08:30 0.50 CC Wash 90'to bottom.5'fill. 09:00 21.00 DR Drill from 15745'to 15971'. MUD PROPERTIES Mud Check Depth:15,932.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft1) pH Gel(lOsec)(Ibf/100ft1) Gel(lomin)(Ibf/100ft1) VERSADRILL 1 9.801 125 31 35! 19 25 WL(mL/30min) 0... Per(mL/mL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/321) Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 HTHP(mU3 4.01 585.0 67.0 21.0 76.1/23.9 MST(Ib/bbl) Sol(%) Sd(%) LGS(%) I ChI(mg/L) Cad!(ppm) Ca(mg/L) I Lime(lb/bbl) LCM !Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.0 0.0 0 17 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make !Model SN I IADC Codes I Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO..,I Nozzles(1/321) IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vcl/Stk(bblfstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(RKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(R) I DLS(1/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 1 III • Report Date: 6/4/2003 Pi FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (ftKB) (ND)(555) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 35 Days From Spud: 35 Daily Operation:6/3/2003 06:00•6/4/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILL AHEAD DRILL AHEAD Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 24.00 DR Drill from 15,971'to 16,330'. MUD PROPERTIES Mud Check Depth:16,281.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') I Gel(10min)(Ibf/100ft') VERSADRILL 9.80 124 28 33 201 26 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") 'Electric Stab(V) O(%) W(%) Oil Water Ratio 4.0 1 615.01 68.0 20.0177.3/22.7 MBT(Ib/bbl) Sd(%) LGS(%) Chl(mg/L) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 Sol(%) 12.0 0.0 01 CaCI(ppm) 19 1 Lime(lb/bbl) 1.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> At Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..I Cum Bit hrs...Total Avg RO... Nozzles(1/37) IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) VoEStk(bbl/stk) PUMP CHECKS Pump N Strokes(spur) P(psi) Eff(%) Slaw Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Dale I MD(ftKB) I Intl(°) I Azm(°) I ND(RKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R • Report Date: 6/5/2003 4 FOREST OIL CORPORATION AFE&Cost Type:035541 o I �, Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 36 Days From Spud: 36 Daily Operation:6/4/2003 06:00-6/5/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILL AHEAD DRILL AHEAD Remadcs Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(Er) CODE SUB CODE Description OP 06:00 0.50 DR Drill from16330'to 16341'. 06:30 3.50 CC Circulate the hole clean. 10:00 1.50 TR Short trip into the window.No hole problems. 11:30 0.50 RS Normal rig service 12:00 1.00 RS Cut drilling line. 13:00 0.50 TR RIH.No hole problems. 13:30 16.50 DR Drill from 16341'to 16584'. MUD PROPERTIES Mud Check Depth:16,500.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Geld 0sec)(Ibf/100ft') Geld 0min)(Ibf/100ft') VERSADRILL 9.80 118 28 31 19 26 WL(mL/30min) HTHP fir L/30... Pm(mIJmL) Mf(mL/mL) Fitter Cake(1/32") -Electric Stab(V) O(%) W(%) Oil Water Ratio 4.0 1 Pf(mUmL) I 500.01 68.5 19.5 77.8/22.2 MBT(1b/bbl) Sol(%) Sd(%) LOS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lh/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl( 12.0 0.0 01 201 1.01 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...I Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump B Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbtlstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 12,905.0 SAFETY CHECKS-JSA Date Type Des Core SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 D R..,.8 J. • • Report Date: 6/6/2003 kh.. FOREST OIL CORPORATION AFE&Cost Type:035541 9 16 o I Daily Drilling Report N. Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM i Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ibftt) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: ND(kKB): 6/22/2003 Original KB Elevation(kKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 37 Days From Spud: 37 Daily Operation:6/5/2003 06:00-6/6/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/BIT W/BIT#9. TIHW/BIT#10. Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 DR DRILL T/16,605. 08:30 2.00 CC PUMP HIGH VIS SWEEP.CBU W/RT&RECIP. 10:30 4.50 DR DRILL T/16,666. 15:00 0.50 RR KUSTATAN TURBINE DOWN. 15:30 6.00 DR DRILL T/16,713.HIGH VIS SWEEP IN @ 16,700. 21:30 1.00 DR PARTIAL TO STALL&PUMP PRES INCREASE.P/U UP T/FREE,PUMP PRES REMAINED HIGH.ATTEMPT BK SURGING.REV CIRC T/750 PSI.NO MTR DIFFERENTIAL W/15 K ON BIT. 22:30 7.50 TR TOH W/POSSIBLE PLUGGED JETS. MUD PROPERTIES Mud Check Depth:16,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/10OfF) pH Gel(10sec)(Ibf/100ft") GeldOmin)(Ibf/100fP) VERSADRILL 1 9.801 124 28 27 19 26 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) MI(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 3.6 1 880.01 68.51 19.0 78.3/21.7 MBT(lb/bbl) Sol(%) 1Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 22 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Lac CONSUMABLES Supply Item Des Consumed Cum On Leo Note FUEL 444.0 - 13,349.0 SAFETY CHECKS-JSA Date Type I Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Awe(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O P E s • • Report Date: 6/7/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 16 o ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 38 Days From Spud: 38 Daily Operation:6/6/2003 06:00.6/7/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILLING AHEAD W/BIT#10. DRILL AHEAD Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.50 TR TOH FOR PRESSURE INCREASE(WET) 07:30 3.00 TR CLEAN FLOOR.CIO BHA.(PLUGGED JETS DUE T/MTR FAILURE).SURFACE TEST MWD. 10:30 3.25 TR TIH W/BIT#10. 13:45 ' 0.50 RS SERVICE RIG. 14:15 1.50 CC CIRCULATE&SHEAR MUD @ 14,082. 15:45 4.25 TR TIH.ORIENT TOOL FACE ABOVE WINDOW T/150.WASH THRU TIGHT SPOT @ 15,804. 20:00 2.00 TR WASH 100'T/BTM.CONDITION MUD. 22:00 8.00 DR DRILL F/16,713 T/16865. MUD PROPERTIES Mud Check Depth:16,801.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100(1') pH Gel(t Osec)(Ibf/100(1') I Gel(10min)(lb/il00ft') VERSADRILL I 9.90 145 28 32 20 27 WL(mL/30min) HTHP(mtJ30... Pm(mL/mL) I%(mUmL) I Mf(mUmL) Filter Cake(1/32") -Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 700.0 68.0 19.0178.2/21.8 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.01 0 221 1.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make I Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs..,Total Avg RO... Nozzles(1/32') IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stoke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Porno* Stokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 148.0 - 13,497.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS 01001) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 6/8/2003 ' 10 Pi FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: - Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (5KB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 39 Days From Spud: 39 Daily Operation:6/7/2003 06:00-6/8/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH F/MWD FAILURE. TEST BOP.C/O MWD PROBE,TIH. Remarks Mud Logging Summary Background Gas Connecmon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail ■ TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 18.00 DR DRILL F/16,685 T/17,129. 00:00 1.50 CC OBSERVE 200 PSI PRESSURE LOSS.TEST SURFACE EQUIPMENT.LOST MWD SIGNAL.CIRCULATE,NO ADDITIONAL PUMP PRES.LOSS. 01:30 1.00 TR TOH T/16,850.PUMP OUT T/16,600.EXCESS DRAG. 02:30 1.50 CC CBU WHILE RT&RECIP.NO ADDITIONAL PRESSURE LOSS. 04:00 2.00 TR TOH.(SLICK T/WINDOW) MUD PROPERTIES Mud Check Depth:17,129.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibt/100ft') pH Gel(10sec)(Ibt/100fP) Gel(10mm)(Ibf/100ft') VERSADRILL 9.801 1021 24 29 17 23 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mL/mL) Ml(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 780.0 69.51 18.0 79.4/20.6 MBT(Ib/bbl) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Co(mg/(m3/1-) Lime(Ib/bbp LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 'Sol(%) 12.5 0.0 0 22 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...1 Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke('n) Liner Size(in) P Max(psi) VoEStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des _Consumed Cum On Loc Note FUEL 740.0 - 14,237.0 SAFETY CHECKS-JSA Date Type - Des Com 6/8/2003 BOP Test 6/8/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(5KB) I VS(N) I NS(ft) I EW(ft) I DLS(V100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 ■ • Report Date: 6/9/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 1 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IbRI) Grade (ftKB) (ND)(ftKB) Run Dale (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 40 Days From Spud: 40 Daily Operation:6/8/2003 06:00-6/9/2003 05:59 Operations at Report Time Proposed Activity 24hrs CUT/SLIP DRLG LINE,SHEAR MUD @ WINDOW. TIH,WASH T/BTM.DRILL AHEAD. Remarks Mud Logging Summary Background Gas Conneclrion Gas I Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.00 TR TON F/MWD FAILURE.CULL 14 JTS HT 40 F/HARD BAND.C/O MWD PROBE.(PROBE BENCH TESTED OK.) 13:00 0.50 RS SERVICE RIG. 13:30 8.00 PT TEST BOP,250/3,000 PSI.REPLACE MANUAL CHOKE VALVE.STATE WAIVED WITNESSING TEST. 21:30 3.00 TR CLEAN FLOOR.MK UP BHA#20.P/U 14 JTS HT 40. 00:30 5.50 TR _TIN.FILL PIPE&CHECK MWD EVERY 2,000'. MUD PROPERTIES Mud Check Depth:17,129.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft1) pH Gel(10500)(Ibf/100ft1) Gel(lomin)(Ibf/1001P) VERSADRILL 9.90 150J 24 31 18 24 WL(mU30min) I HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) I Sol(%) ISd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) I LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 12.5 0.0 0 22 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make I Model SN I IADC Codes Depth In IRKS) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spin) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 148.0 - 14,385.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Dale I MD)SKB) I Ind(°) ( Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 6/10/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: 00(in) Wt/Len(Ib/ft) Grade (ftKB) (IVO)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 41 Days From Spud: 41 Daily Operation:6/9/2003 06:00-6/10/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILLING AHEAD W/BIT 11 RR1 DRILL AHEAD Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 TR TIH W/BHA#20 T/14,650. 06:30 1.00 RS SERVICE RIG,C/O SAVER SUB.CIRC/SHEAR MUD. 07:30 1.00 RS CUT!SLIP DRLG LINE. 08:30 3.75 TR TIH.WASH&REAM BRIDGES @ 16,660&16,780.WASH T/BTM. 12:15 11.75 DR DRILL F/17,129 T/17,362. 00:00 0.50 CC RT&RECIP F/HOLE CLEANING. 00:30 5.50 DR DRILL F/17,362 T/17,490 MUD PROPERTIES Mud Check Depth:17,369.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/1005) VERSADRILL 9.801 96 24 27 15 22 WL(mL/30min) I HTHP(mU30... Pm(mIJmL) Pf(mL/mL) Mf(mUmL) Filter Cake(1/32") °Electric Stab(V) O(%) W(%( Oil Water Ratio 3.8 845.01 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%( LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 23 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) (Make I Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit.. Cum Bit hrs...Total Avg RO.. Nozzles(1/321 IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) VoEStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 592.0 - 14,977.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azle(°) I TVD(ftKB) I VS(fl) I NS(ft) I EW(ft) I DLS(°l100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • RF S • Report Date: 6/11/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 r9 o I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - - Report Number: 42 Days From Spud: 42 Daily Operation:6/10/2003 06:00-6/11/2003 05:59 Operations at Report Time Proposed Activity 24hrs DRILLING AHEAD DRILL AHEAD Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Descdption OP 06:00 5.00 DR DRILLING F/17,490 T/17,551.(CONDUCT LOAD TEST F/TURBINES CIRC/RT 20 MIN) 11:00 0.50 RS SERVICE RIG. 11:30 0.50 RS TURBINE FLAME OUT. 12:00 1.75 DR DRILL F/17,551T/17,596.CHECK SHOT SURVEY. 13:45 0.50 CC CIRC/RT/RECIP F/HOLE CLEANING. 14:15 4.50 DR DRILL F/17,596 T/17,665. 18:45 1.00 RS TURBINE DN ON DIFFERENTIAL GRD.SWAP T/CAT POWER AFTER TROUBLESHOOTING. 19:45 10.25 DR DRILL F/17,665 T/17,733. MUD PROPERTIES Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(11d/100(?) pH Gel(10min)(Ibf/100ft') VERSADRILL 9.801 98 23 27 'Geld (Ibf/100ft') 16 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(U) Oil Water Ratio 3.6 1 750.0 69.5 18.0179.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) 1 LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run 1Size(in) 1 Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...I Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spin) P(psi) Eff(U) Slow Spd MUD USAGE Des Consumed On Lee CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 740.0 - 15,717.0 SAFETY CHECKS-JSA Date Type I Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R.E • • Report Date: 6/12/2003 O c. FOREST OIL CORPORATION AFE&Cost Type:035541 t6 O:.ti?' Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 43 Days From Spud: 43 Daily Operation:6/11/2003 06:00-6/12/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/BHA 20.1155'@ REPORT TIME. P/U BHA#21,BIT#12.TIH.DRILL AHEAD. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas 'Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 DR DRILL F/17,732 T/17,735.PUMP HIGH VIS SWEEP. 06:30 0.50 CC RT,RECIP&CIRC.CLEAR BIT W/SWEEP. 07:00 5.50 DR DRILL F/17,735 T/17,787. 12:30 0.25 RS SWAP BK T/SHORE POWER. 12:45 6.75 DR DRILL F/17,787 T/17,805. 19:30 0.50 CC RT,RECIP&CIRC. 20:00 2.00 DR DRILL F/17,805 T/ 17,809. 22:00 8.00 TR TOH W/BIT 11R MUD PROPERTIES Mud Check Depth:17,809.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/10ofN) Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ff') VERSADRILL I 9.80 93 25 28 14 14 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.8 840.0 69.5 18.0 79.4/20.6 MST(Ib/bbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.2 0 21 1.6 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(t) pH IGel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100f1') VERSADRILL 9.80 98 23 27 16 22 WL(mL/30min) HTHP(mU30...'Pm(mUmL) 'Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) ChI(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM 'Mud Lost to Hole(hbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model 1SN IADC Codes Depth In MKS) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 1,570.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind 7) I Azm 7) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R£s • • Report Date: 6/13/2003 N. FOREST OIL CORPORATION AFEB Cost Type:035541 vi o I l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(b/tt) Grade (RKB) (TVD)(RKB) Run Date (b/gap Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 44 Days From Spud: 44 Daily Operation:6/12/2003 06:00-6/13/2003 05:59 Operations at Report Deer Proposed Activity 24hrs DRILL AHEAD AT 17866'. DRILL TO TD. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS - Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.50 TR FOIL Change BHA. 09:30 5.00 TR RIH to window. 14:30 1.00 CC Circulate,shear mud and service rig. 15:30 1.00 TR RIH.Tight at 15550'. 16:30 8.00 TR Wash and ream with stiff assmbly to 17770'. 00:30 1.50 WR Ream undergauge hole to bottom. 02:00 4.00 DR Drill with bit#12 to 17866' MUD PROPERTIES Mud Check Depth:17,809.0 ftKB Mud Type MW(lb/gap FV(s/qt) PV Override(cp) VP(Ibf/1008) pH Gel(10sec)(Ibf/100ft) Gel(10min)(IM/1001t) VERSADRILL 9.85 104 23 27 1 13 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filer Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 4.2 777.0 69.5 18.0179.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.2 01 CaCI( ppm) 21 1.3 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qp PV Override(op) YP(Ibf/100ft') pH Gel(10sec)(IbE100R) Gel(10min)(Ibf/100ft) VERSADRILL 1 9.801 98J 23 27 161 22 WL(mL/30min)1 HTHP(mU30... Pm(mL/mL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") —Electric Stab(V)10(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 1 Chl(mg/L) 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) 1Make Model SN 1IADC Codes Depth In(RKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") 11ADC Bit Dull PUMP OPERATIONS Pump B Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) i PUMP CHECKS Pump rt Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Lac CONSUMABLES Supply Item Des Consumed Cum On Leo Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(R) I NS(R) I EW(R) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 o R E r 1111 Report Date: 6/14/2003 k. FOREST OIL CORPORATION AFE&Cost Type:035541 1 16 Q I c Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 45 Days From Spud: 45 Daily Operation:6/13/2003 06:00-6/14/2003 05:59 Operations at Report Time Proposed Activity 24hrs CONDITION THE HOLE FOR LOGS. LOG WITH SCHLUMBERGER. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 22.50 DR Drill from 17866'to TD at 18091'. 04:30 1.50 CC Condition hole for logs. MUD PROPERTIES Mud Check Depth:18,050.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) (Ibf/100ft') pH Gel(10min)(Ibf/100fP) VERSADRILL 9.80 87 23 22 22 1 Gel(10sec)(Ibf/100ft') 13 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) P((mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) On Water Ratio 1 4.0 1 727.01 69.5 18.0179.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(rng/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.21 0 22 1 Lime(Ib/bbl) 2.3 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH 001(10sec)(Ibf/1n0f1') Gel(10min)(Ibf/t00fP) VERSADRILL 9.801 98 23 27 16 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32'1 Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 1 01 21 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs..,Total Avg RO... Nozzles(1/32") 1IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Elf(%) Slow Spd MUD USAGE Des Consumed On Loo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA _ Date Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O 2£ • Report Date: 6/15/2003 4. A FOREST OIL CORPORATION AFE&Cost Type:035541 i9 16 o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IMO Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 46 Days From Spud: 46 Daily Operation:6/14/2003 06:00-6/15/2003 05:59 Operations at Report Time Proposed Activity 24hrs CIRCULATE CLEANING HOLE. LOG WITH SCHLUMBERGER. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.50 CC Circulate,rotate and reciprocate cleaning hole at bottom. 09:30 10.00 TR Pump,pull and back ream into shoe. 19:30 1.00 RS Normal rig service 20:30 1.50 CC Circulate the hole clean. 22:00 4.00 TR RIH.Wash 15150',15300'&17900'to 18091'.10'fill on bottom. 02:00 4.00 CC Circulate for logs. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(losec)(Ibf/100R') Gel(10min)(Ibf/1o0ft') VERSADRILL 9.90 105 25 25 13 23 WL(mL/30min) I HTHP(m1/30...I Pm(mUmL) Pf(mUmL) I Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 684.0 69.0 18.0 79.3/20.7 MBT(lb/bbl) 'Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) —Mud Lost to Surface(bbl) 13.0 0.2 0 21 2.0 Mud Check Depth:17,713.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100f) pH Gel(10sec)(Ibf/100ft') Gel(lomin)(Ibf/10011') VERSADRILL 9.80 98 23 27 16 22 WL(mL/3omin) I HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Fitter Cake(1/32") `Electric Stab(d) O(%) W(%( Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.0I BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit.. Cum Bit hrs...Total Avg RO...'Nozzles(1/32") 'ADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bblstk) PUMP CHECKS Pump ft Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) 1 DLS(.1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • ft Es Report Date: 6/16/2003 ii` FOREST OIL CORPORATION AFE&Cost Type:035541 l l I ‘. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)OMB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 47 Days From Spud: 47 Daily Operation:6/15/2003 06:00-6/16/2003 05:59 Operations at Report Time Proposed Activity 24hrs SHORT TRIP. CLEAN THE HOLE FOR LOGS Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 CC Condition the hole at bottom. 06:30 1.00 TR Trip out of the hole pumping to 17464'. 07:30 2.00 CC Circulate bottoms up for hole drag. 09:30 4.00 TR Pump out to 16901'.Pulled free from 16901'to shoe. 13:30 1.50 RS Normal rig service.Cut drilling line. 15:00 5.00 TR RIH.Clean out coal bridges to 15200' 20:00 6.50 TR 'RIH.Ream from 17150'to bottom.18'fill. 02:30 2.50 CC Circulate at bottom. 05:00 1.00 TR POH with stiff assembly.Pumping each stand out. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ib0100f0) pH Gel(10ses)(Ibf/10Ott') Gel(10min)(Ibf/100tP) VERSADRILL 9.85 110 22 23 13 21 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) IM(mUmL) Filter Cake(1/32") 'Electric Stab(V) O(%) W(%) On Water Ratio 3.6 692.0 69.0 18.0 79.3/20.7 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.2 0 21 1.6 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/1 O0ft") pH Gel(10sec)(Ibf/1 OOff) I Gel(10min)(Ibf/100ft1) VERSADRILL 9.80 98J 23 27 161 22 WL(mL/3omin) HTHP(mU30...I Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") —Electric Stab(V) O(%) W(%) On Water Ratio 3.61 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hale(bbl) Mud Last to Surface(bbl) 12.5 0.0 0I CaCI(ppm) 21 2.0I BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(M) Make Model SN IADC Codes Depth In(ftKB) 'Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS _ Pump# Make Model Stroke(n) Liner Size(in) P Max(pail VotStk(bbl/stk) PUMP CHECKS Pump# Strokes(apm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des I Cam SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 ■ • R F s • Report Date: 6/17/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 l 4( 1 \.. Daily Drilling Report •Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: - Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IV) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 48 Days From Spud: 48 Daily Operation:6/16/2003 06:00-6/17/2003 05:59 Operations at Report lime Proposed Activity 24hrs REAMING TO BOTTOM CLEAN HOLE FOR LOGS. Remarks Mud Logging Summary Background Gas Connedrion Gas Trip Gas !Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 7.50 TR Pump out of the hole to 14440'. 13:30 2.00 CC Circulate hole clean. 15:30 1.00 RS Normal rig service.Change out saver sub. 16:30 5.50 TR RIH.Ream out bridges at 15285',15335 to 15345'.RIH. 22:00 8.00 TR Ream and clean hole from 16534'.Depth 17550'at report time. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fP) pH Gel(10sec)(Ibf/100ft') Gel)lomin)(11a/1001E)VERSADRILL 9.85 107 261 26 14 23 WL(mL/30min) HTHP(mU30...I Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W)%) Oil Water Ratio 3.4 715.0 69.0 18.0179.3/20.7 i MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.0 0.2 0 211 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(1Omin)(Ibf/100ft') VERSADRILL I 9.80 98 23 27 16 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) IMf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(ib/bbl) I Sol(%) Sd(%) LGS(N) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl( 12.5 0.0 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump tt Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Sift(bbl/stk) PUMP CHECKS Pump a Strokes(spm) P(psi) Elf(%) Slow Spd MUD USAGE Des Consumed On LOB CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date 1 MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 R 6 . Report Date: 6/18/2003 o s 4. FOREST OIL CORPORATION AFE&Cost Type:035541 19 6 o I Daily Drilling Report k. Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: 00(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 49 Days From Spud: 49 Daily Operation:6/17/2003 06:00-6/18/2003 05:59 Operations at Report Time Proposed Activity 24hrs SHORT TRIP. CONDITION HOLE. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 TR Finish reaming to bottom with many areas of torque and drag. 09:00 3.50 CC Condition hole,raise MW to 10+ppg. 12:30 2.00 TR Circulate out each stand to 17597'. 14:30 2.00 TR Attemp to pull pie without circulation.Unsuccessful.Regain circulation.Work pipe free. 16:30 3.00 CC Circulate to clean the hole. 19:30 0.50 TR Pump out to 17384'.Packing off. 20:00 3.00 CC Circulate with 300 gpm and 110 RPM. 23:00 2.00 TR Pump out to 16807'.Tight hole. 01:00 2.50 CC Circulate below 16807'with 110 RPM and 300 GPM. 03:30 1.00 TR Pump out to 16126'.Packing off. 04:30 1.50 CC Circulate to clean the hole at 16126' MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(lssec)(Ibf/100ft') Gel(lOmin)(Ibf/100ft') VERSADRILL 1 10.051 1021 26 27 13 23 WL(mL/30min) HTHP(mU30.., Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V)101%) 1W(%) Oil Water Ratio 3.8 731.0 69.01 17.5 79.8/20.2 MBT(lb/bbl) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 Sol(%) 13.5 0.21 l 0 21 1 Lime(lb/bbl) 1.3 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10min)(Ibf/100ft') VERSADRILL 9.80 98 23 27 1 Gel(10sec)(Ibf/100ft') 16 22 WL(mL/30min) HTHP(m1/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32') -Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 3.6 I m 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad'(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 12.5 0.0 1 01 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) 'Make Model SN 1IADC Codes Depth In(ftKB) Total Depth Drilled by Sit...Cum Bit hrs...I Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I led(°I Azm(°) I ND(MKS) I VS(ft) 1 NS(ft) I EW(ft) I DLS(°/100ft) R E s • • Report Date: 6/19/2003 O FOREST OIL CORPORATION AFE&Cost Type:035541 o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK ' Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/ND: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 50 Days From Spud: 50 Daily Operation:6/18/2003 06:00-6/19/2003 05:59 Operations at Report lime Proposed Activity 24hrs TEST BOP. FISHING Remarks Mud Logging Summary Background Gas 'Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 6.00 TR Pump,wash and pull untill unable to pass 15040'. 12:00 6.00 TR Back ream up through coal bridges from 15040'.Free at 14995'. 18:00 1.50 TR Pull into casing to 14182'. 19:30 1.50 CC Circulate the hole clean. 21:00 9.00 TR Lost 1000 psi pump pressure.POH wet looking for washout.BHA left in the hole. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(lbf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL I 10.00 109 27 27 13 23 WL(mU30min) HTHP(mV30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Filter Cake(1/32") `Electric Stab N) O(%) W(%) Oil Water Ratio 3.6 649.0 69.5 17.0 80.3/19.7 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.5 0.2 0 20 'Lime(lb/bbl) 1.0 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(lomin)(Ibf/100ft') VERSADRILL 9.80 98 23 271 16 22 WL(mL/30min) HTHP(m1/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) litter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21I 2.0I BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN 'IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des Com 6/19/2003 BOP Test 6/19/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftKB) I not(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R 8,! III • Report Date: 6/20/2003 4,la( FOREST OIL CORPORATION AFE&Cost Type:035541 9 16 o I Daily Drilling Report k. Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Iblft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 51 Days From Spud: 51 Daily Operation:6/19/2003 06:00-6/20/2003 05:59 Operations at Report lime Proposed Activity 24hrs TIH W/OVERSHOT.5,000'@ REPORT TIME. FISH F/BHA Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 RS SERVICE RIG. 07:00 7.50 PT TEST BOP 250/3,000 PSI.AOGC WITNESSED.ANNULAR TEST FAILED. 14:30 9.50 BO CLEAN FLOOR.CHANGE OUT HYDRIL ELEMENT.REBUILD#3 MACVOY ON CHOKE MANIFOLD.TEST. 00:00 0.50 RS CHANGE OUT SAVOR SUB. 00:30 0.50 TR L/D 18 JTS HWDP F/DERRICK. 01:00 2.00 TR M/U OVERSHOT(5 3/4 W/4 3/4"SPIRAL),TOPSUB,BUMPER SUB,JARS,12-4 3/4"DC'S&PUMP OUT SUB. 03:00 3.00 TR TIH.BRK CIRC EVERY 1,000'. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100fr) pH Gel(10sec)(lbf/100ft') Gel(lSmin)(Ibf/100ft') VERSADRILL 10.00 112 28 27 13 24 - WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 4.4 605.0 69.5 17.0 80.3/19.7 MBT(lb/bbl) Sol(%) IS'(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lo(bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.5 0.2 0 20 1.0 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(lbf/100ft) pH Gel(10sec)(Ibf/100ft') I Gel(10min)(Ibf/100ft') VERSADRILL 9.80 98 23 27 16 22 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") `Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0179.4/20.6 MBT(lb/bbl) Sol(%) ISd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) I LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...I Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke('n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lou Note FUEL 0.0 - 17,287.0 SAFETY CHECKS-JSA Date Type Des I Coo SURVEY DATA Date I MD(ftKB) I Intl(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/f SSft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 6/21/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(bxt) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 52 Days From Spud: 52 Daily Operation:6/20/2003 06:00-6/21/2003 05:59 Operations at Report Time Proposed Activity 24hrs LAYING DN 132'FISH. P/U CLN OUT ASSY.TIH.CONDITION HOLE.SHORT TRIP. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas 'Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 12.00 Fl TIH W/OVERSHOT.BRK CIRC EVERY 1,000'.WASH THRU COALS. 18:00 0.75 Fl TAG&ENGAGE FISH @ 16,850.W/40 K DN WT. PRES INC&30K EXCESS DRAG. 18:45 11.25 Fl TOH T/SHOE.DROP DART. PUMP DRY JOB.TOH.RECOVERED FISH. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100fP) Gel(10min)(Ibf/100R') VERSADRILL 10.00 131 25 24 13 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(rnLJmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 4.4 632.0 69.5 17.0 80.3/19.7 MBT(Ib/bbl) 'Sol(%) I Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 13.5 0.2 0 20 1.0 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(N) pH Gel(10sec)(Ibf/100ft') 'Ceti Orrin)(Ibf/100ft') VERSADRILL 9.80 98 23 27 161 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) 'PT(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 750.0 69.5 18.0 79.4/20.6 MBT(Ibbbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ih/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 I 0 21 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Dulled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/371 IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loo Note FUEL 592.0 - 17,879.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Dale I MD(ftKB) I Intl(°) I Awn(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(1/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 6/22/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (1b/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 ' Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(f/hr): Report Number: 53 Days From Spud: 53 Daily Operation:6/21/2003 06:00-6/22/2003 05:59 Operations at Report Time Proposed Activity 24hrs CIRCULATE CONDITION HOLE SHORT TRIP,CONDITION F/LOGS. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 Fl L/D FISH&FISHING TOOLS. 08:30 1.00 RS CUT/SLIP DRLG LINE.INSPECT,ADJUST BRAKES. 09:30 1.50 TR P/U&RUN BHA. 11:00 0.50 RS XO T/HT 40 TOOLS.SWAP T/RIG POWER. 11:30 0.50 TR TIH W/CLEAN OUT ASSY. 12:00 0.50 RS SERVICE RIG. 12:30 4.50 TR TIH T/14,600. 17:00 3.00 CC CIRCULATE/SHEAR MUD WHILE RECIP/RT @ 14,600.HEAVY RETURNS SAND,SILT&COAL. 20:00 8.50 TR TIH.SLICK T/16,900.W&R 16,963,16,995&17,133.WASH T/BTM.REAM TIGHT AREAS. 04:30 1.50 CC CIRCULATE,SWEEP&CONDITION HOLE.RECIP/RT&PUMP 350-375 GPM. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(tosec))lbf/10ofe) Gel)lDmm)(lbf/100ft) VERSADRILL 1 MW(lb/gal) 10.05 128 27 23 12 20 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1132") -Electric Stab(V) 0(%) W(%) Oil Water Ratio 1 4.2 1 618.0 69.5 17.0180.3/19.7 MBT(Ib/bbl) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 1 Sol(%) 13.5 0.2 0 20 0.1 Mud Check Depth:17,713.0 ftKB Mud Type FV(s/qt) PV Ovee(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 1 MW(lb/gal) rtir 9.80 98 23 27 16 22 WL(mL/30min) HTHP(mL/30... Pm(mU m mL) Pf(mUL) Mf(mUmL) filter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 750.0 69.51 18.0 79.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) 'Lime(lb/bbl) I LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run(Size(in) Make Model ISN IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO.. Noules(1/32") ADC Bit Dull PUMP OPERATIONS Pump B Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbUstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Lac CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 1,184.0 - 19,063.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(EKE) I Ind(°) I Ann(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100f0 www.peloton.com Page 1/2 Report Printed: 7/31/2012 O It e s al Report Date: 6/23/2003 kiiir, FOREST OIL CORPORATION AFE&Cost Type:035541 o f N. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(11//ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gai) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 54 Days From Spud: 54 Daily Operation:6/22/2003 06:00-6/23/2003 05:59 Operations at Report Time Proposed ActNity 24hrs SHORT TRIP,WORKING TIGHT HOLE AS NECESSARY. CONDITION HOLE.TOH F/LOGS. Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-matt TIME LOG From HRS.(M) CODE SUB CODE Description OP 06:00 6.00 CC PUMP HIGH VIS SWEEP,CIRC GOUT @ 370 GPM w/RECIP/RT.HEAVY RETURNS,PUMP 2ND SWEEP, STD BK STAND,CONT CIRC. 12:00 1.50 WR WASH&REAM 18,002-17,883.TIGHT. 13:30 3.00 TR PUMP OUT OF HOLE F/18,091 T/17,300.NO PUMP&SLICK F/17,300 T/16,567. 16:30 0.50 RS WORK ON SWIVEL PACKING. 17:00 7.50 WR TIH F/16,567.WORK TIGHT AREAS @ 17,038&17,690.WASH T/BTM,NO FILL. 00:30 24.00 CC SWEEP HOLE W/RECIP/RT.RAISE MW F/10.1 T/10.2 PPG. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(IM/1SSf/) pH Gel(1 Osec)(Ibf/100fF) Gel(lSmn)(Ibf/100ft1) VERSADRILL 1 10.20 1051 29 291 1 WL(mL/30min) HTHP(mU30... Pm(mUmL) 'Pt(mUmL) Mf(mUmL) Finer Cake(1/32') Electric Stab(V) O(%) W(%) 131 01 Water Ratio 23 1 4.0 1 649.0 69.5 17.0180.3119.7 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(113/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 13.5 0.21 1 01 201 1 0.81 1 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/ql) PV Ovenide(op) YP(IM/1 Soft=) pH Gel(10sec)(Hf/100ft') Gel(10min)(1601 00f0) VERSADRILL 1 9.80 981 23 27 1 1 WL(mU30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) 10l Water Ratio 22 1 3.61 1 1 1 750.0 69.5 18.0179.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Cu(mg/L) CaCI(ppm) Ca(mg/L) Lime(b/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.01 1 0 211 1 2.01 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Metre 'Model 1SN 1IADC Codes 'Depth In(ftKB) Total Depth Ogled by Bit...rum Bit hrs...1TOtal Avg RO...'Nozzles(1/32) I IADC Bit Dull PUMP OPERATIONS Pump# I Make Model 1 Stroke(n) Liner Size(M) P Max(psi) Vol/Stk(bbpslb) PUMP CHECKS Pump# I Strokes(spm) I P(Pei) I EN(%) Slav Spd MUD USAGE Des I Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 1,332.0 - 20,395.0 SAFETY CHECKS-JSA Date Type Des I Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Aan(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R E S • Report Date: 6/24/2003 4. A FOREST OIL CORPORATION AFE&Cost Type:035541 19 i6 o l ‘. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 55 Days From Spud: 55 Daily Operation:6/23/2003 06:00-6/24/2003 05:59 Operations at Report Time Proposed Activity 24hrs SHORT TRIP SHORT TRIP/CONDITION HOLE Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From FIRS.(hr) CODE SUB CODE Description OP 06:00 10.00 TR TOH W/NO PUMP T/SHOE.WORK W/PUMP TIGHT AREAS 0 17,900,17,850&17,000,16,890.SLICK F/ 16890 T/14,669. 16:00 0.50 RS CLEAN FLOOR/SERVICE RIG. 16:30 1.50 RS CIO SWIVEL PACKING/WASHPIPE. 18:00 1.00 TR TIH T/15,200 19:00 0.50 RS ADJUST SWIVEL PACKING/GREASE 19:30 4.50 TR TIH T/16,895 W/NO PUMP.WORK TIGHT AREAS W/PUMP&RT 0 16,895,17,015,17,412.WASH T/BTM F/ 17,412. 00:00 4.00 CC PUMP HIGH VIS.CIRC 0 370 GPM W/RT&RECIP.RAISE MW F/10.2 T/10.4 PPG. 04:00 2.00 TR TOH W/NO PUMP EXCEPT 0 17,825&17,720. - MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt( PV Override(cp) YP(Ibf/100fd) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 10.30 1291 32 23 1 13 23 WL(mL/30min) HTHP(mL/30...1 Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/321 Electric Stab(V) O(%) W(%) Oil Water Ratio 4.4 678.0 69.51 17.0180.3/19.7 MIST(lb/bbl) Sol(%) Sd(%) LGS(%) CaCI(ppm) Ca(mg/L) Lime(11c/bbl) LCM 1 Mud Lost to Hole(bbl) 1 Mud Last to Surface(bbl) 13.5 0.2 1 ChI(mg/L) 0 20 0.6 Mud Check Depth:17,713.0 ftKB Mud Type FV(s/qt) PV Override(cp) YP(Ibf/100fE) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 1 MW(lb/gal) 9.80 98 23 271 161 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio ,. 1 3.6 750.0) 69.5 18.0 79.4/20.6 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Last to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 1Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump B Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 444.0 - 20,839.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I led(') I Azm(1 I ND(ftKB) I_ VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 6/25/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 56 Days From Spud: 56 Daily Operation:6/24/2003 06:00-6/25/2003 05:59 Operations at Report Time Proposed Activity 24hrs LOGGING.SWS PLATFORM EXPRESS 16,700 @REPORT TIME RUN DSI LOG Remarks Mud Logging Summary Background Gas Connectrton Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 TR TOH T/15,500.SLICK F/17,720 07:00 4.00 TR TIH.WORK TIGHT AREAS @ 16,800-845/17,545-560/17,700-740/17,850-880.WASH 90'T/BTM,NO FILL. 11:00 3.00 CC ° CIRC @ 370 GPM W/RT&RECIP. 14:00 11.00 TR TOH.17,913-17,818 WORK W/PUMP ATTEMPTING T/PK OFF,REGAIN FULL CIRC.SHUT DN PUMP&PULL THRU TWICE W/NO PUMP.TOH W/NO PUMP ASSIST. 01:00 1.00 LO PJSM.RIG UP SWS.P/U PLATFORM EXPRESS LOGGING TOOLS,LOAD RA SOURCES. 02:00 4.00 LO RIH W/SWS PLATFORM EXPRESS LOG.16,700 @ REPORT TIME. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/1 DOS') VERSADRILL 10.50 167 33 27 1 14 24 WL(mL/30min) I HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mL/mL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 4.61 624.0 67.5 18.0 78.9/21.1 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbt) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.5 0.2 0 191 Mud Check Depth:17,713.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 9.80 98 23 27 16 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) W(%) Oil Water Ratio 3.6 750.01 69.5 18.0 79.4/20.6 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 12.5 0.0 0 21 2.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs.. Total Avg RO...I Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(Br) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump N Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 592.0 - 21,431.0 SAFETY CHECKS-JSA Data Type Des Corn SURVEY DATA Date I MD(ftKB) I Ina(°) I Azm(°) I NO(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R F s • Report Date: 6/26/2003 N' FOREST OIL CORPORATION AFE&Cost Type:035541 19 i6 0 4 Daily Drilling Report 1 Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IV) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(kKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 57 Days From Spud: 57 Daily Operation:6/25/2003 06:00-6/26/2003 05:59 Operations at Report Time Proposed Activity 24hrs WAIT ON SWS LWD TOOLS. P/U SWS LWD TOOLS,TIH.LOG HEMLOCK.CIRC&COND. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.50 LO RIH W/SWS PLATFORM EXPRESS LOG.UNABLE T/PASS 17,523 W/LOGS.AFTER MULTIPLE ATTEMPTS, LOG OUT T/ 14,700. 10:30 1.00 RS CUT/SLIP DRLG LINE. 11:30 0.50 RS SERVICE RIG. 12:00 4.50 PT TEST BOPE 250/3,000 PSI.AOGC WAIVED WITNESSING. 16:30 7.50 RR CHANGE OUT KELLY HOSE.ADJUST TORQUE TUBE.CLEAN RIG. 00:00 2.00 TR BHA.L/D 12 4 3/4"DC'S.P/U 9 JTS 3 1/2 HWDP.STD BK FLEX DC'S&HWDP.C/O 2 BENT JTS HT 40. 02:00 4.00 WO WAIT ON SWS LWD TOOLS.CLEAN OBM F/RIG. MUD PROPERTIES Mud Check Depth:18,091.0 kKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/1 OW) Geld Omin)(Ibf/100ft') VERSADRILL 10.50 170 33 27 1 15 25 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 5.0 I 1 400.0 67.5 18.0178.9/21.1 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/LI Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.5 0.01 0 19 1.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN 11ADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...1 Total Avg RO... Nozzles(1/321 IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 148.0 21,579.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Awn(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 6/27/2003 ,A► FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 58 Days From Spud: 58 Daily Operation:6/26/2003 06:00-6/27/2003 05:59 Operations at Report Time Proposed Activity 24hrs LOG WITH LWD. CONDITION HOLE FOR CASING. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 LO WAIT ON LOGGING TOOLS. 08:00 8.00 LO Rig up LWD surface equipment. 16:00 3.00 LO BHA. 19:00 8.50 LO RIH with LWD and clean out assembly. 03:30 2.50 LO LOG from 17200'.Depth 17600'at report time. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(lnmm)(Ibf/100ft') VERSADRILL 1 10.50 230 34 39 1 201 27 WL(mL/3nmin) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") 'Electric Stab(V) O(%) W(V) Oil Water Ratio 1 5.2 1 350.01 67.5 18.0 78.9/21.1 MBT(lb/bbl) Sol(%) Sd(%) LOS(%) CIA(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.5 0.0 0 19 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) 'Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1132") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Leo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD dtKa) I Intl(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I OLS(°/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 6/28/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): '6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 59 Days From Spud: 59 Daily Operation:6/27/2003 06:00-6/28/2003 05:59 Operations at Report Time Proposed Activity 24hrs DOWNLOAD LWD IRUN LINER. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 LO Continue LWD run to bottom.No fill. 09:00 3.00 CC Condition hole. 12:00 1.50 TR Short trip to 16900'.Pump out first 650'. 13:30 2.50 TR Ream back to bottom.Several areas of torque. 16:00 2.50 TR Circulate and condition hole. 18:30 3.00 TR POH to window.Pump out first 650'. 21:30 0.50 TR Dry job.Drop 2.25"drift. 22:00 7.00 TR POH.Lay down LWD. 05:00 1.00 TR Down load LWD tools. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type FV(s/qt) PV Override(op) YP(Ibf/100f') pH Gel(10sec)(Ibf/100fP) Gel(10min)(Ibf/100ft') VERSADRILL I MW(lb/gal) 10.50 160 35 38 21 29 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mf(mL/mL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 5.0 I I ( 350.0 62.5 23.0173.1/26.9 MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) CaCI(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.5 0.0 I Chi(mg/L) 0 19 'Lime(Ib/bbl) 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..rum Bit hrs...Total Avg RO... Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(rn) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Sbw Spd MUD USAGE Des Consumed On Loo CONSUMABLES Supply Item Des Consumed Cum On Log Note FUEL 0.0' - 21,579.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date ( MD(ftKB) i Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 o E s III • Report Date: 6/29/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 6 o > Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW APIIUWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (NCB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 60 Days From Spud: 60 Daily Operation:6/28/2003 06:00-6/29/2003 05:59 Operations at Report lime Proposed Activity 24hrs RUN PRODUCTION LINER. SET LINER AND CEMENT Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 LO Down load and process LWD information. 08:00 9.50 LO Analyze logs.Rig maintenance. 17:30 5.00 CS Pick up 85 joints of production liner. 22:30 7.50 CS RIH with liner.Depth at report time 13500'. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(I1ff/1001P) pH Gel(10sec)(Ibi/100ft') Gel(10min)(Ibf/t00ft•) VERSADRILL 10.45 225 34 39 21 29 WL(mL/30min) HTHP(mL/30... Pm(mIJmL) Pt(mL/mL) Mf(mL/mL) Fiber Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 5.0 ( 300.0 62.5 23.0 73.1/26.9 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.5 0.0 0 19 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 'Model SN IADC Codes Depth In(NCB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") 'IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA Date Type I Des Corn SURVEY DATA Date I MD(11KB) I led(°) I Az'(°) I ND(11KB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 Report Date: 6/30/2003 rA► FOREST OIL CORPORATION AFE&Cost Type:035541 T Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (flKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 61 Days From Spud: 61 Daily Operation:6/29/2003 06:00-6/30/2003 05:59 Operations at Report Time Proposed Activity 24hrs POH WITH LINER-SLOW POH WITH LINER. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 CS Run production liner to window.Check circulation.Record torque,pressure etc. 09:00 3.00 CS RIH.Liner would not pass 17721'.Work liner attemting to RIH. 12:00 9.00 CS POH.Left liner in hole. 21:00 0.50 RS Normal Rig service 21:30 2.50 Fl Pick up fishing tools. 00:00 1.00 RS Cut drilling line. 01:00 3.50 TR RIH with spear. 04:30 1.50 Fl Spear fish at 14229'.POH slow with liner. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(1 DSec)(Ibf/100ft') Gel(10min)(Ibf/t Daft') VERSADRILL 10.451 240 37 381 21 28 WL(mL/30min) HTHP(mU30.., Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 1 9.6 1 1 300.01 62.5 23.0 73.1/26.9 MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 14.5 0.0 01 19 1.0 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN IADC Codes Depth In(flKB) Total Depth Drilled by Bit...ICum Bit hrs...Total Avg RO... Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA Date I Type Des Corn SURVEY DATA Date I MD(ftKB) I not(°) I Ham(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°11001t) www.peloton.com Page 1/2 Report Printed: 7/31/2012 4 R f Report Date: 7/1/2003 4 A FOREST OIL CORPORATION AFE&Cost Type:035541 y o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 62 Days From Spud: 62 Daily Operation:6/30/2003 06:00-7/1/2003 05:59 Operations at Report Time Proposed Activity 24hrs M/U CLEAN OUT ASSEMBLY. CONDITION HOLE. Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 12.00 Fl POH.Liner speared with grapple. 18:00 1.00 Fl Lay down fishing tools and liner top packer. 19:00 9.00 Fl Lay down recovered liner.Full recovery. 04:00 1.50 Fl Lay down fishing drill collars. 05:30 0.50 AL M/U clean out assembly. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/tnoft') pH Gel(10sec)(Ibf/1nDtt') 'Geld omin)(Ibr/t00ft') VERSADRILL I 10.60 250 41 47 291 36 WL(mL/30min) HTHP(mU30... Pm(mL/mL) Pf(mL/mL) Mf(mmL) Fitter Cake(1/32") `Electdc Stab(V) 0(%) W(%) Oil Water Ratio 14.0 I U 300.0 61.5 24.0 71.9/28.1 MBT(Ib/bbl) Sol(%) Sd(%) I LGS(%) Chl(mg/L) I CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM I Mud Lost to Hole(bbl) litud Last to Surface(bbl) 14.5 0.0 0 14 1.0 U BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size/e) Make Model SN IADC Codes jDepth In(ftKB) Total Depth Drilled by Bit...'Cum Bit hrs...Total Avg RO.. 'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(°) I Awn(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100f1) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0 Report Date: 7/2/2003 , 0 A FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 63 Days From Spud: 63 Daily Operation:7/1/2003 06:00-7/2/2003 05:59 Operations at Report Time I Proposed Activity 24hrs SHORT TRIP FOR CASING CONDITION HOLE. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 5.00 TR RIH with clean out assembly. 11:00 3.00 CC Condition mud. 14:00 2.00 TR RIH.Ream tight hole 15150'to 15400'. 16:00 8.00 WR Ream tight hole from 17080 to bottom.Hard reaming from 17698'to 17780'. 00:00 4.50 CC Circulate the hole clean. 04:30 1.50 TR Short trip to 17000'. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type FV(s/qt) PV Override(cp) VP(Ibf/100tH) pH 001(10sec)(Ibf/100ft') Gel(lomin)(Ibf/100ft') VERSADRILL 1 MW(lb/gal) 10.65 145 34 321 20 27 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 14.0 1 300.0 62.5 23.0 73.1/26.9 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 14.5 0.01 0 14 1.0 ,. BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) VoUStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On L. Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Az'(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R E s Report Date: 7/3/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 o I �;; Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IMO Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 64 Days From Spud: 64 Daily Operation:7/2/2003 06:00-7/3/2003 05:59 Operations at Report Time Proposed Activity 24hrs CONDITION HOLE CONDITION HOLE Remarks Mud Logging Summary Background Gas 'Connection Gas Top Gas I Max Gas DAILY CONTACTS ' Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.50 TR Ream back to bottom. 09:30 0.50 CC Circulate. 10:00 0.50 TR Wash out of hole to 17500'. 10:30 1.00 TR Ream back to bottom. 11:30 1.00 CC Circulate. 12:30 1.00 TR Wash out of hole to 17530'. 13:30 2.00 TR Ream back to bottom. 15:30 4.00 TR Wash out of hole to 17300'.Pull to 15000'. 19:30 1.00 TR Clean area at 15000'to 15100'. 20:30 2.50 TR Work bumper jars.Regain pipe movement. 23:00 1.00 TR i Back ream from 14964'to 14910'.Pull into casing at 14820'. 00:00 1.50 RS Rig service.Cut drilling line. 01:30 2.50 TR RIH.Tight at 17770'. 04:00 2.00 TR Ream tight area from 17770'to bottom. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qi) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(Ibf/100fe) 001(10min)(Ibf/t 001') VERSADRILL 10.601 136 30 28 16 21 WL(mL/30min) HTHP(mU30...I Pm(mUmL) I Pf(mUmL) Ml(mumL) Filter Cake(1/32") Electric Stab(V)IO(%) W(%) Oil Water Ratio 8.4 350.0 63.5 22.0 74.3/25.7 MBT(Ib/bbl) Sd(%) LGS(%) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 Sol(%) 14.5 0.01 1 Chl(mg/L) 0 14 0 1.01 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(m) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...I Corn Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lou Note FUEL 0.0 - 21,579.0 SAFETY CHECKS-JSA - Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I_ VS(ft) I NS(ft) I EW(ft) I DLS(°ft00R) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R E • ! Report Date: 7/4/2003 4t, FOREST OIL CORPORATION AFE&Cost Type:035541 >9 o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(Ib/R) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 65 Days From Spud: 65 Daily Operation:7/3/2003 06:00-7/4/2003 05:59 Operations at Report Time Proposed Activity 24hrs RUN 5 1/2 PRODUCTION LINER. CEMENT.SET HANGER Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Descdptlon OP 06:00 1.50 CC CIRCULATE. 07:30 1.50 TR SHORT TRIP T/17,500.PUMP ASSIST @ 17,770.REAM 17,722-17,817.SLICK C T/BTM.NO FILL. 09:00 1.00 CC CIRCULATE,RECIP&RT. 10:00 2.00 TR TOH,PUMP ASSIST T/17,480.17,440,17,120&17,050 PULLED 50 K OVER. 12:00 2.00 TR TOH T/WINDOW.PUMP DRY JOB.DROP 2.25 DRIFT. 14:00 6.00 TR TOH.STD BK BHA. 20:00 1.50 CS RIG UP T/RUN 5 1/2 LINER. 21:30 8.50 CS PJSM.MK UPFLOAT EQUIP.RUN 5 1/2 LINER. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fP) pH I Gel(10ses)(Ibf/100ft') Gel(10min)(Ibf/100fr) VERSADRILL 10.50 125 28 28 17 24 WL(mL/3omin) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mL/mL) Filter Cake(1/32") —Electric Stab(V) O(%) W 1% Oil Water Ratio 8.4 I 375.0 64.0 22.0_174.4/25.6 MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(NT/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.0 0.0 I 0 14 1.0f BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make Model SN IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/321 IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Stow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 148.0 - 21,727.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) Azm(°) I ND(ftKB) I VS(R) I NS(R) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 III ! Report Date: 7/5/2003 4if FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW ,. API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): . Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 66 Days From Spud: 66 Daily Operation:7/4/2003 06:00-7/5/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH W/RUNNING TOOL. TIH 9 5/8 SRAPER ASSY.TOH.TIH 7 5/8 SCRAPER.TOH Remarks Mud Logging Summary Background Gas I Connectrton Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 CS TIH 5 1/2 LINER ON DP T/17,790. 09:00 1.00 CC CIRCULATE DP&LINER VOL.CHECK WTS&TQ.SET LIMITS. 10:00 2.00 CS TIH W/LINER T/17,705.TIGHT. BRK CIRC.ATTEMT T/WASH THRU N/G. 12:00 9.50 WR WASH&REAM LINER F/17,720 T/18,085.TIGHT&PACKING OFF.P/U CMT HEAD. 21:30 4.00 CM PJSM.SWAP OVER T/BJ.PUMP 5 BBL H2O,TEST LINES T/5,000 PSI.START RT&RECIP,PUMP15 BBL H2O.PUMP 25 BBL MCS SPACER.PUMP 323 BBL 15.7 CLASS G CMT.DISPLACE W/260 BBL OBM.BUMP PLUG W/3,400 PSI,SET HANGER&CHECK FLOATS 3.5 BBL RETURN. 01:30 2.00 CM SET LINER TOP PACKER.UNSTING 22'REVERSE CIRC @ 5 BPM 2,900 PSI.110 BBL CMT RETURNS. 03:30 1.00 TR L/D CMT HEAD.TOH 5 STDS 04:30 1.00 CC CIRC LONG WAY DP VOLUME.PUMP DRY JOB. 05:30 0.50 TR TOH W/RUNNING TOOL. MUD PROPERTIES Mud Check Depth:18,091.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/1001t') pH I Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') VERSADRILL 10.50 105 28 28 16 23 WL(mL/30min) HTHP MIL/30... Pm(mL/mL) Pf(mIJmL) Mf(mL/mL) Fitter Cake(1/321 'Electric Stab(V) O(%) Al(%) Oil Water Ratio 8.8 375.0 64.0 22.0 74.4/25.6 MBT(lb/bbl) I Sol(%) Sd(%) I LGS(%) Chl(mg/L) 'Cad!(ppm) Ca(mg/L) Lime(11a/bbl) I LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.0 0.0 0 14 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes I Depth In(ftKB) "Total Depth Drilled by Bit...I Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl'stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 296.0 - 22,023.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(°) I Azm(°) I ND(ftKB) I VS(ft) 1 NS(ft) I EW(ft) I DLS(°1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 III • Report Date: 7/6/2003 AL ;; FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM P rea: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(1b/ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 67 Days From Spud: 67 Daily Operation:7/5/2003 06:00-7/6/2003 05:59 Operations at Report Time Proposed Activity 24hrs CIRCULATE BTMS UP. I TOH W/7 5/8 SCRAPER&L/D.P/U&RUN 5 1/2 SCRAPER Remarks 1 Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From FIRS.(hr) CODE SUB CODE Description OP 06:00 8.00 TR TOH W/RUNNING TOOL.P/U CMT HEAD BRK DN&L/D. 14:00 0.50 RS SERVICE RIG. 14:30 2.50 TR L/D FLEX COLLARS F/DRK.P/U 9 5/8 SCRAPER BHA. 17:00 1.50 TR TIH W/SCRAPER TO 7 5/8 LT @ 5,074. 18:30 2.00 TR PUMP DRY JOB.TOH 20:30 4.00 TR C/O BHA.P/U 7 5/8 SCRAPER BHA.TIH 00:30 1.00 RS CUT/SLIP DRLG LINE.SERVICE RIG. 01:30 4.50 TR TIH W/7 5/8 SCRAPER T/5 1/2 LT @ 14,583.NO STRINGERS. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(slgt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100fe) VERSADRILL 10.50 135 28 29 I 17 24 WL(mL/30min) HTHP(mU30... Pm)rnUmL) Pf(mL/mL) Mt(mLJmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 9.0 350.0 64.0 22.0 74.4/25.6 MBT(Ib/bbl) Sol(%) Sd 1%) LGS(%) Chi(mg/L) Cad'(ppm) Ca(mg/L) Lime(1b/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 14.0 0.0 0 14 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make I Model SN I IADC Codes I Depth In(ftK0) Total Depth Drilled by Bit...Cum Bit hrs.."Total Avg RO.. Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbUStk) PUMP CHECKS Pump# Strokes(spm) P(psi) EN(%) Slow Spd MUD USAGE - Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 74.0 - 22,097.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(11KB) I Ind(°) I Azm(°) I ND(ftKB( I VS(ft) I NS(ft) EW(ft) I DLS(°11001r) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O.R E s III . Report Date: 7/7/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 17 16 o I t Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) WtLen(1b/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 '5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 68 Days From Spud: 68 Daily Operation:7/6/2003 06:00-7/7/2003 05:59 Operations at Report lime Proposed Activity 24hrs TIH W/5 1/2 SCRAPER ASSY. CBU.TOH.L/D SCRAPER.TIH.DRILL PART OF SHOETRACK. Remarks Mud Logging Summary Background Gas Connection Gas 'Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 CC CBU.PUMP DRY JOB. 08:00 6.50 TR TOH W/7 5/8 SCRAPER.CULL HT 40 F/HARD BANDING. 14:30 2.50 TR L/D 3 1/2 HWDP&4 3/4 DC'S. 17:00 1.50 TR CLEAR FLOOR.RIG T/P/U 3 1/8 DC'S&2 7/8 DP. 18:30 6.50 TR P/U 9-3 1/8 DC'S&107-JTS 2 7/8 DP. 01:00 3.50 TR TIH W/5 1/2 SCRAPER T/14,583. 04:30 1.00 PT TEST 5 1/2 LINER T/3,000 PSI F/30 MIN.108 PSI LOSS. 05:30 0.50 TR TIH W/5 1/2 SCRAPER. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100fE) pH Gel(10sec)(Ibf/100R') Gel(10min)(Ibf/100ft') VERSADRILL 10.60 128 28 22 15 22 WL(mL/30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mt(mUmL) Fitter Cake(t/32") 'Electric Stab(V) O(%) W)%) Oil Water Ratio 12.0 1 350.0 64.0 22.0174.4/25.6 MBT(Ib/bbl) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 1 Sol)%) 14.0 0.0 0 14 1 Lime(16/bbl) 1.0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run!Size(in) I Make I Model SN I IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...ICum Bit hrs...Total Avg RO...I Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbtstk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed_Cum On Lou Note FUEL 518.0 - 22,615.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) .I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O F S • • Report Date: 7/8/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 9 16 Q I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(IV) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MDITVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 69 Days From Spud: 69 Daily Operation:7/7/2003 06:00-7/8/2003 05:59 Operations at Report Time Proposed Activity 24hrs CLEANING MUD PITS. CLEAN PITS&SURFACE EQUIPMENT. Remarks Mud Logging Summary Background Gas Connecirion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 5.00 TR TIH W/5 1/2 SCRAPER.WASH THRU CMT STRINGERS 17,085 T/17,860.WASH&RT THRU STRINGERS T/ L/C @ 17,996. 11:00 4.00 CC CIRCULATE&CENTRIFUGE MUD.WOO. 15:00 3.50 DC DRILL L/C&CEMENT T/18,035. 18:30 3.00 CC CBU 21:30 0.50 PT TEST CASING T/3,000 PSI F/30 MIN.168 PSI LOSS. 22:00 3.00 TR TOH T/14,500. 01:00 5.00 RS CLEAN PITS. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) I FV(s/qt) JPV Ovenide(cp) [VP(Ibf/100ft') pH 'Geld 0sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') WL(mL/3omin) HTHP(mL/30...IPot(rni nL) IPf(mlJmL) Mf(mL/rrL) Fitter Cake(1/32') Electric Stab(V) O(%) W(%) JOil Water Ratio MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(16/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 222.0 - 22,837.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(') I Axon(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 o R F r • • Report Date: 7/9/2003 4 A FOREST OIL CORPORATION AFE&Cost Type:035541 .q 16 o l L Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (1b/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): '.. Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 70 Days From Spud: 70 Daily Operation:7/8/2003 06:00-7/9/2003 05:59 Operations at Report Time Proposed Activity 24hrs CLEANING PITS/FLUSHING SURFACE EQUIPMENT. DISPLACE OBM W/SPACERS,SEAWATER.DISPLACE W/KCL. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 24.00 RS CLEANING PITS&SURFACE EQUIPMENT. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ffi) IpH 'Geld Osec)(Ibf/100fP) Geld 0min)(Ibt/100ft') WL(mL/30min) HTHP(mU30... Pm(mUmL) I Pf(mUmL) IMf(mUmL) Fitter Cake(1/32") -Electric Stab(V) O(%) I W(%) ION Water Ratio MBT(lb/bbl) I Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) I Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Core Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff)%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 74.0 - 22,911.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Ann(°) I TVD(ftKB) I VS(ft) I NS(ft) I SW(ft) I DLS(°f100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R E.s. • • Report Date: 7/10/2003 is A FOREST OIL CORPORATION AFE&Cost Type:035541 o c` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(lb/ft) Grade (REP) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 71 Days From Spud: 71 Daily Operation:7/9/2003 06:00-7/10/2003 05:59 Operations at Report Time Proposed Activity 24hrs TOH T/5 1/2 LT.FILL PITS W/FRESH WATER. BUILD VOLUME.DISPLACE WELL W/5%KCL&FILTER. Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 8.00 RS CLEAN PITS,FLUSH SURFACE EQUIP.CIRCULATE SOAPY WATER THRU ALL LINES.FILL PITS W/SEA WATER.SWACO-INJECT ALL EXCESS FLUIDS. 14:00 2.50 TR TIH F/5 1/2 LIT T/18,025. 16:30 8.00 CC REVERSE IN 50 BBL MAPCO,4 SPACERS&SEA WATER. 00:30 5.50 CC ATTEMPT T/PK OFF W/SEA WATER ALL THE WAY AROUND.CIRCULATE THE LONG WAY.PUMP SWEEP &CIRCULATE OUT MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100R') pH Gel(10sec)(Ibf/100fE) Gel(10min)(Ibf/100ft') SEAWATER 8.50 2811 WL(mU30min) HTHP(mU30... Pm(mUmL) )Pf(mUmL) Mt(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) IW(%) Oil Water Ratio MBT(1b/bbl) 1Sol(%) ISd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ta(mg/L) 'Lime O/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Ovemde(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100R') IGel(10min)(Ibf/100ft') WL(mL/30min) I HTHP(mU30...'Pm(mUmL) IPf(mUmL) Mf(mUmL) (Fitter Cake(1/32') -Electric Stab(d( O(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) 'Sd(%) LGS(%) Chl(mg/L) 'CaCI(ppm) lea(mg/L) 'Lime(lb/bbl) 'LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) rake I Model 1SN ADC Codes Depth In(RKB) Total Depth Drilled by Bit...I Cum Bit hrs...Total Avg RO... Nozzles(1/32") /ADC Bit Dull PUMP OPERATIONS Pump it Make Model Stroke(E( Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE - Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 592.0 - 23,503.0 SAFETY CHECKS-JSA Date Type Des Com 7/10/2003 BOP Drill SURVEY DATA Date I MD(ftKB) I Inc'(°) I Azm(°) ND(ftKB) I VS(ft) I NS(ft) ( EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 It'E S i Report Date: 7/11/2003 • FOREST OIL CORPORATION AFE&Cost Type:035541 rn o `; Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(Ib/h) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(f/hr): Report Number: 72 Days From Spud: 72 Daily Operation:7/10/2003 06:00-7/11/2003 05:59 Operations at Report lime Proposed Activity 24hrs CIRCULATE AND FILTER BRINE. POH. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 CC Finish displacing oil based mud with seawater. 06:30 2.00 TR Pull out of 5.5"liner. 08:30 4.50 CC Clean mud pits and mix 5%KCL. 13:00 2.00 TR RIH.Rig to reverse circulate. 15:00 4.00 CC Pump sweep and displace with KCL. 19:00 8.50 CC Circulate and filter KCL. 03:30 2.50 CC Add ammonium nitrate marker and continue filtering fluid. MUD PROPERTIES Mud Check Depth:<Depth7> Mud Type MW(Ib/gal) FV(s/ql) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft) Gel(10min)(IM/100ft') KCL BRINE 8.601 28 1 WL(mU3Omin) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mt(mUmL)filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio MBT(1b/bbl) Sal(%) 1Sd(%) LGS(%) Chl(mg/L) Gael(ppm) Ca(mg/L) 'Lime(1b/bbl) LCM Mud Last to Hole(bbl) 1 Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) 1 PV Override(ep) VP Obi/1001P) 1pH Gel(10sec)(Ibf/t00ff) Gel(10min)(Ibf/100ft') WL(mL/30min) HTHP(mL/30...1 Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) 1W(%) Oil Water Ratio MBT(1b/bbl) I Sol(%) 1Sd(%) 'LOS(%) Chl(mg/L) raCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make 1 Model SN !ADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Stow Spd MUD USAGE Des Consumed On Los CONSUMABLES Supply Item Des Consumed Cum On L. Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date I Type Des Com SURVEY DATA Date I MD(ttKB) I InG(°) I Pam(°) I ND(ftKB) I V") I NS(ft) I EW(ft) 1 DLS(°l100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0R E s • Report Date: 7/12/2003 kliaf„... FOREST OIL CORPORATION AFE&Cost Type:035541 19 t6 o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 73 Days From Spud: 73 Daily Operation:7/11/2003 06:00-7/12/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH WITH TIE BACK SLEVE POLISH MILL. LAY DOWN DRILL PIPE. Remarks Mud Logging Summary Background Gas I Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 CC Finish circulating filtered brine with ammoniun nitrate tracer.Final turbidity reading 166. 06:30 12.00 TR POH lay down 2 7/8"tools. 18:30 8.50 LO Logging&Evaluation USIT/CBL. 03:00 1.00 RS Normal Rig service 04:00 2.00 TR RIH with tie back sieve polish mill. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') I pH Ge1(10sec)(Ibf/1001t') GeldOntin)(Ibf/100fe) KCL BRINE 8.60 28 11.5 WL(mU3Omin) HTHP(mL/30...I Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/37') Electric Stab(v) 0(%) W(%) Oil Water Ratio MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud TWO MW(Ib/gal) IFV(s/qt) PV Override(cp) VP(Ibf/1005') pH I Gel(lOsec)(Ibf/1 Soft') .I Geld 0min)(Ibf/100ft') WL(mL/30min) HTHP(mU30... Pm(mUmL) I Pf(mUmL) Mf(mUmL) Filter Cake(1/37') -Electric Stab(V)10(%) IW 1%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run(Size(in) I Make Model SN I IADC Codes I Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32) IADC Bit Dull PUMP OPERATIONS Pump B Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# I Strokes(spm) I P(psi) I ER(%) I Slow Spd MUD USAGE Des I Consumed I On Loo CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date I Type I Des I Com SURVEY DATA Date MD(ftKB) Ind(°) Azm(°) ND(ftKB) VS(ft) NS(ft) EW(ft) DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 7/13/2003 N. s- FOREST OIL CORPORATION AFE&Cost Type:035541 ri 16 o l ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(mm) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK - Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): , Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 74 Days From Spud: 74 Daily Operation:7/12/2003 06:00-7/13/2003 05:59 Operations at Report Time Proposed Activity 24hrs TESTING BOP. PERF AND DST Remarks Mud Logging Summary Background Gas 'Connectdon Gas I Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.50 TR RIH with polish mill. 09:30 1.00 TR Polish tie back sleeve at 14583'. 10:30 1.50 CC Circulate. 12:00 16.50 TR Lay down drill pipe. 04:30 1.50 PT Begin weekly BOP test. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ff) pH Gel(10sec)(Ibf/100(t') Gel(10min)(Ibf/10o11') WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) rFiler Cake(1/32") 'Electric Stab(V) O(%) W(%) IOil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) J I LGS(%) Chl(mg/L) 'CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) Mud Check Depth:14,580.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(1bf/100ft') Ge1(10min)(Ibf/100ft') KCL BRINE 8.601 28 1 12.0 WL(mU30min) HTHP(mL/30...I Per(mUmL) I Pf(mUmL) 'Mf(mUmL) Filter Cake(1/32") /Electric Stab(V)IO(%) W(%) Oil Water Ratio MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) I Cht(mg/L) CaCI(ppm) Ca(mg/L) Lime)lb/bbl) LCM I Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit.. Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbEstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lou Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date Type Des Corn 7/13/2003 BOP Test 7/13/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100k) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O RE.S • Report Date: 7/14/2003 FOREST OIL CORPORATION • AFE&Cost Type:035541 kb o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 ' Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 75 Days From Spud: 75 Daily Operation:7/13/2003 06:00-7/14/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH WITH DST. RIG UP AND DST. Remarks Mud Logging Summary Background Gas Connectdon Gas ITdp Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 9.50 PT 'Weekly BOP test.Replaced lower top drive valve. 15:30 8.00 LO 'Perforate top hemlock 17784'to 17855'wire line measure. 23:30 2.00 TR Load out wire line unit.Take on DST surface equipment. 01:30 4.50 TR Pick up DST tubing.RIH. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) r"„ PV Override(cp) VP(Ib1/100ft) ph Gel(t OSec)(I11/100ft') Gel(tOmin)(Ib1/100ft') KCL BRINE 8.60 28 12.0 WL(mU3Omin) I HTHP(mL/30...1Pm(mUmL) IPf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) 1W(%) Oil Water Ratio MBT(lb/bbl) Sol(%) Sd(% LGS(%) IChI(mg/L) CaCI(ppm) Ca(mg/L) rime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/10Oft') pH IGel(lOsec)(Ibf/1001) IGet(10min)(Ib1/100ft) WL(mLl30min) HTHP(mU30... Pm(mUmL) Pt(mUmL) Mt(mUmL) rFilter Cake(1/32") Electric Stab(V) O(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) ISd(%) I LGS(%) Chl(mg/L) 'CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make 'Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32') IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbLlstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date I Type Des Com SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) ` VS(ft) I NS(ft) I EW(ft) I DLS(°/1001t) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IDReport Date: 7/15/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/6/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 76 Days From Spud: 76 Daily Operation:7/14/2003 06:00-7/15/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIG UP TO DST. DST Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Desaiptian OP 06:00 13.50 TR Pick up 9.2#tubing with seal assembly and GLMs. 19:30 10.50 WT Stab into tie back sieve.Rig up DST equipment. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100(t') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') KCL BRINE 8.601 28 l 12.01 WL(mU30min) HTHP(mL/30...1 Pm(mUmL) Pf(mUmL) 1 Mf(mUmL) Filter Cake(1/32') Electric Stab(V)10(%) 1W(%) Oil Water Ratio MBT(Ibtobl) 'Sol(%) 1Sd(%) LGS(%) 1Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) 1 LCM 'Mad Lost to Hole(bbl) 'Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type 1 MW(lb/gal) FV(s/ql) PV Override(op) YP(Ibf/100(?) pH Gel(losec)(Ibf/100ft') Gel(10min)(Ibf/100fl') WL(mL/30min) 1HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/37') 'Electric Stab(V) 0(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) 'Sol(%) Sd(%) 'LOS(%) Chl(mg/L) ICI(ppm) 1Ca(mg/L) Lime(Ib/bbi) LCM Mud Lost to Hole(bbl) (Mod Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) 'Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Corn Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) I Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date Twe Des Com SURVEY DATA Dale I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(fi) I NS(ft) ( EW(ft) I OLS(°/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 e„ F al • Report Date: 7/16/2003 s..4 FOREST OIL CORPORATION AFE&Cost Type:035541 16 o I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(1b/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 77 Days From Spud: 77 Daily Operation:7/15/2003 06:00-7/16/2003 05:59 Operations at Report Time Proposed Activity 24hrs WELL ON DST DST Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas 9 P DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 10.00 WT Rig up surface equipment.Pressure test. 16:00 14.00 WT Well on test. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100(t') pH Gel(t Osec)(Ibf/100f1') Gel(10min)(Ibf/100ft') KCL BRINE 8.60 l 12.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) I%(mUmL) IMi(mUmL) [Filter Cake(1/32") Electric Stab(V) 1°(%) IW(/) ION Water Ratio MBT(lb/bbl) I Sol(%) ISd(%) (LGS(%) IChl(mg/L) CoOl(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 kKB Mud Type MW(lb/gal) FV(s/qt) PV Ovenide(cp) [VP(Ibf/t SOS') pH IGel(iOsec)(Ibf/1 OOft') Gel(10min)(Ibf/100ft') WL(mL/30min) HTHP(mL/30... Pm(mUmL) I Pf(mUmL) Mf(mUmL) [Filter Cake(1/32°) Electric Stab(V)JO(%) I W(%) ION Water Ratio MBT(Ib/bbl) I Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime/b/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32') IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbEstk) PUMP CHECKS Pump# i Strokes(spm) P(psi) Eff(%) Slew Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lon Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date MD(ftKB) I tent(°) I Azm(°) I ND(ftKB) I VS(ft) I N5(ft) EW(ft) I DLS(°11001t) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IReport Date: 7/17/2003 `. ST FOREST OIL CORPORATION AFE&Cost Type:035541 1 16 o I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/t) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(f/hr): - Report Number: 78 Days From Spud: 78 Daily Operation:7/16/2003 06:00-7/17/2003 05:59 Operations at Report Time (Proposed Activity 24hrs WELL ON DST Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 WT Row well on DST. 06:30 6.00 WT Shut off gas lift source.Allow tubing to bleed down.Rig up slick line with pressure gages.RIH. 12:30 13.50 WT Shoot fluid level in annulus near 3rd GLM at 12002'. Set gages at top pert. 02:00 4.00 WT Start gas lift.Well on DST.Static rates after 23:00 hours. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/10oft) pH 001(10sec)(Ibt/100ff) Gel)l0min)(Ibf/100fF) KCL BRINE 8.60 281 12.0 WL(mU3Omin)1HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") -Electric Stab(V) O(%) 1W(%) loll Water Ratio MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) O1CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) [YP(Ibf/100(?) pH 1 Gel(10sec)(Ibf/100(0 Get)lomin)(Ibt/1005') WL(mL/30min) 1HTHP(mU30... Pm(mUmL) 1Pf(mUmL) Mf(mUmL) Filter Cake(1/37) Electric Stab(V) O(%) 1W(%) Oil Water Ratio MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) 1CaCI(ppm) Ca(mg/L) Lime(lo/bbl) LCM Mud Last to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model 1SN IADC Codes Depth In(ftKB) 'Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/321 IADC Bit Dull PUMP OPERATIONS Pump H Make Model Stroke(in) Liner Size(in) P Max(psi) VeEStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Nate FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I TVD(ftKB) I VS(ft) ( NS(ft) I EW(ft) I DLS(°/1008) I www.peloton.com Page 1/2 Report Printed: 7/31/2012 . Report Date: 7/18/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: p Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 79 Days From Spud: 79 Daily Operation:7/17/2003 06:00-7/18/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIG DOWN POLLARD SLICKLINE.BLEED OFF GAS. RIG UP SCHLUMBERGER,PERFORATE 2ND SET. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 21.00 WT START SHUT IN PERIOD @ 0800.TBG PRES 1104 PSI. 03:00 3.00 WT POH W/SLICK LINE.BLEED GAS F/WELL T/FLARE. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') Gel(10sec)(11:4/101101) Gel(lomin)(Ibf/1 S0ft') KCL BRINE 8.601 28 1 pH 12 .01 WL(mU30min) I HTHP(mL/30... Per(mUmL) Pt(mUmL) Mf(mUmL) Fitter Cake(1/37') Electric Stab(V) 0(%) I (%) Oil Water Ratio MBT(lb/bbl) Sol(%) ISd(%) I LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) I Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type 'MW(lb/gal) FV(s/qt) PV Override(cp) {VP(I11/100ft') IpH IGel(10sec)(Ib1/100ft') I Get(t Omin)(Ibf/100ft') WL(mL/30min) I HTHP(mU30...I Pm(mUmL) Pf(mL/mL) Mf(mUmL) Fitter Cake(1137') Electric Stab(V)10(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) I Sol(%) ISd(%) I LOS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...I Nozzles(1/32) IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ES(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 23,503.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I SW(ft) I DLS(°1100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R 8 • ` Report Date: 7/19/2003 s-' FOREST OIL CORPORATION AFE&Cost Type:035541 19 16 4` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(RKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(f/hr): Report Number: 80 Days From Spud: 80 Daily Operation:7/18/2003 06:00-7/19/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIG UP POLLARD SLICKLINE RUN 2.75 GAUGE RING.REDRESS SWS TOOLS.LOG. Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Desaiption OP 06:00 2.00 WT BLEED GAS OFF TBG.SHUT IN WELL. 08:00 3.00 WT RIG DOWN SECTION OF PTS.RIG UP SCHLUMBERGER. 11:00 3.50 WT RIH WITH GAMMA RAY/USIT TOOLS.TOOLS STUCK @ 14,380 WLM(BTM GAS MANDREL).WORK LINE T/FREE.N/G 14:30 2.00 WT RIG UP PTS.PRESSURE TEST LINES T/3,000 PSI. 16:30 2.50 WT PULL 2 K OVER SWS WIRE WT.PRESSURE ANNULUS T/1,300 PSI W/GAS.TBG PRES @ 13 PSI,TOOLS FREE. 19:00 2.00 WT POH W/SWS.BLEED GAS F/TEST LINES.BRK LUBRICATOR.NOSE SPRING OF LOGGING TOOL WAS WEDGED IN GAS MANDREL @ 14,380 WLM. 21:00 1.50 WT RE-DRESS TOOLS W/CENTRALIZER @ NOSE.MK UP LUBRICATOR. 22:30 2.50 WT RIH W/SWS TOOLS.WOULD NOT PASS 14,380(GLM)WORK LINE.N/G.POH W/SWS. 01:00 1.00 WT BLEED OFF&BRK LUBRICATOR.MOVE CENTRALIZER UP 5'F/NOSE. 02:00 3.00 WT RIH W/GR/USIT.WOULD NOT PASS 14,380.POH.L/D SWS TOOLS. 05:00 1.00 WT RIG UP POLLARD SLICK LINE. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(Ibt/100ft') Gel(10min)(Ibf/100ft') KCL BRINE I 8.60 12.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) I Mf(mUmL) Fitter Cake(1/32') 'Electric Stab(V)10(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKS Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100R') pH 'GeldOsec)(Ibf/100ffi) Geld Omin)(Ibf/100ft') WL(mL/30min) HTHP(mU30...IPm(mUmL) Pf(mUmL) Mf(mUmL) (Fitter Cake(1/32") -Electric Stab(V)10(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) ISd(%) LGS(%) Chl(mg/L) Cad](ppm) Ca(mg/L) Lime(ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stri ngno>,<des> Bit Run Size(in) Make Model SN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Los CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 296.0 - 23,799.0 SAFETY CHECKS-JSA Date Type Des I Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 7/20/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wi/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/ND: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 81 Days From Spud: 81 Daily Operation:7/19/2003 06:00-7/20/2003 05:59 Operations at Report Time I Proposed Activity 24hrs ATTEMPT TO TOH.N/G EXCESSIVE DRAG SPOT CRUDE OIL,WORK TUBING.TOH Remarks Mud Logging Summary Background Gas Connection Gas I Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.50 LO RID SWS equipment&R/U Pollard slick line equipment 07:30 2.50 PP Wireline-RIH 2.75"gauge ring-Won't go at 14,380'-POOH 10:00 2.00 PP Bleed off-L/D slick line tools&lubricator-R/U SWS 12:00 0.50 PP R/U SWS Lubricator 12:30 1.50 PP RIH w/SWS gr/usit logs,2 centralizers&impression block,would not pass 14,380. 14:00 2.00 PP POH w/ logs.Bleed off gas U PTS. 16:00 1.50 PP R/D SWS-Complete bleed down. R/D test tree 17:30 4.00 CC R/U to Rev Circ.257 BBLs to fill annulus.rev circ 3 dp volumes. 2%solids. 21:30 1.50 PP R/U test tree&Pollard Wireline&lubricator&test to 2500 psi- 23:00 2.50 PP RIH w/Pollard 2.73"gauge ring.Would not pass 14,380,work line n/g.POH.bleed off.r/d 01:30 1.50 TR R/U,Unsting seal assy f/pbr..-monitor well backside heavy U tbg 03:00 1.50 CC Reverse Circ&monitor well balance 04:30 1.50 TR Atempt If TOH.Excessive drag.-Work pipe. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibt/100ft') Gel(10min)(Ibf/100ft') KCL BRINE 1 8.651 28 l 8.5 WL(nrU30min) l IHTHP(mL/30...1 Pm(mUmL) Pt(mUmL) AM(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) 1W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) ISd(%) LGS(%) Chl(mg/L) 'Cod(ppm) Ca(mg/L) Lime(lb/bbl) I LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type 1 MW(lb/gal) )IFV(s/qt) PV Override(cp) YP(Ibf/1001) pH 1 Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft) WL(mL/30min) 1HTHP(mU30...I Pm(mUmL) Pf(mUmL) Mf(mUmL) (Filler Cake(1/37) 'Electric Stab(V) 0(%) 1W(%) Oil Water Ratio MST(lb/bbl) Sol(%) ISd(%) LGS(%) ChI(mg/L) I CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) I Make Model SN IADC Codes 'Depth In(EKE) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO.. Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(kt) Liner Size(in) P Max(psi) Vol/Stk(bbllstk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 592.0 - 24,391.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I led(°) I Aeon(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 E • • Report Date: 7/21/2003 j. A FOREST OIL CORPORATION AFE&Cost Type:035541 t9 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(113/ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 82 Days From Spud: 82 Daily Operation:7/20/2003 06:00-7/21/2003 05:59 Operations at Report Time Proposed Activity 24hrs CIRCULATING PIPE FREEING PILL FREE PIPE,TOH W/3 1/2 TUBING. Remarks Mud Logging Summary I Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile Email TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.50 TR ATTEMPT T/TOH W/3 1/2 TBG&GLM'S.EXCESSIVE DRAG&SMALL PIPE MOVEMENT.WORK PIPE. 07:30 4.50 CC CIRCULATE&WORK PIPE IN DIFFERENT COMBINATIONS.1380 UNITS GAS @ BU,TAKE THRU GAS BUSTER. 12:00 2.00 CC CIRCULATE.TRANSFER CRUDE F/PRODUCTION T/UP RIGHT TANK.TRANSFER T/PILL PIT. 14:00 6.50 CC SPOT 50 BBL CRUDE @ BTM OF TBG.PUMP 1/2 BPM INTO ANNULUS WHILE WORKING PIPE.CRUDE T/ SURFACE @ 5140 STKS.CALCULATED=8900 STKS T/SURFACE.1200 UNITS GAS @ B.U.GO THRU GAS BUSTER 20:30 6.50 CC MONITOR WELL.,STATIC.BRK HEAD PIN LOAD CARBIDE MARKER.MIX 1/2 PPB FLOW-VIS T/ACTIVE SYSTEM.CARBIDE RETURNED @ 8900 SKS.(CALCULATED) 03:00 3.00 CC MIX/PUMP 60 BBL LUBE-TEX,CRUDE,FLOW VIS PILL.WORK PIPE WHILE PUMPING PILL ACROSS GLM'S.GAINED 10'PIPEMOVEMENT. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(1b/gal) FV(s/qt) PV Override(cp) YP(Ibf/100111) pH Gel(10sec)(Ibf/100(1') Gel(iDmin)(Ibf/100ft') KCL BRINE 8.55 28 I 9.0 WL(mU30min) HTHP(mL/30... Per(mUmL) IPf(mUmL) I Mf(mL/mL) Fitter Cake(1/37) -Electric Stab(V) O(%) W(%) IOil Water Ratio MBT(Ib/bbl) I Sol(%) Sd(%) LOS(%) Chl(mg/L) Cad](ppm) Ca(mg/L) I Lime(113/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type I MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/10011') pH Gei(10sec)(Ibf/100(1') Gei(10min)(Ibf/100ft') WL(mL/3omin) HTHP(mL/30... Pm(mUmL) I Pt(mUmL) Mf(mUmL) litter Cake(1/32') 1 Electric Stab(V) O(%) W(%) On Water Ratio MBT(1b/bbl) Sol(%) Sd(%) I LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) I Lime(lo/bbl) LCM Mod Lost to Hole(bbl) I Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(11KB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...I Nozzles(1/32') IIADC Bit Dull PUMP OPERATIONS Pump# i Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 24,391.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD((KB) I Ind(°) I Azm(') I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 �,, . • Report Date: 7/2212003 IA FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Iblt) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 83 Days From Spud: 83 Daily Operation:7/21/2003 06:00-7/22/2003 05:59 Operations at Report Time Proposed Activity 24hrs ATTEMPT T/WORK PIPE.N/G LINE UP FISHING TOOLS CHEMICAL CUT TUBING.TOH Remarks Mud Logging Summary Background Gas Connectdon Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 22.00 TR WORKING 3 1/2 TUBING.CIRCULATING CRUDE,LUBETEX,FLOW-VIS PILLS,ATTEMPTING T/FREE TBG/ MANDRELS.MADE A TOTAL OF 53'. 04:00 2.00 CC RIG UP&REV CIRC.@ 5 1/2 BPM @ 1150 PSI. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(IM/100ft') pH Gel(10sec)(Ibf/t00ft') Gel(10min)(Ibf/100ft') KCL BRINE 8.501 42 Il 9.01 WL(mU30min) 1HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) 0(%) 1W(%) 10i1 Water Ratio MBT(Ib/bbl) Sol(%) 1Sd(%) LGS(%) Chl(mg/L) Cad](ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type 1MW(Ib/gal) 1 FV(skit) PV Override(cp) YP(Ibf/1005') 1pH 1 Gel(10sec)(Ibf/100ft') 1Gel(10min)(Ibf/100ft') WL(mL/30min) 1HTHP(mU30...1Pm(mUmL) Pf(mUmL) Mf(mUmL) [Fiber Cake(1/32") -Electric Stab(V) 0(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) 1 LGS(%) Chl(mg/L) Cad](ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Last to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model 1SN UNDO Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32") 1IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 148.0 - 24,539.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ft(B) I Ind(°) I Azm(°) I ND(RKB) r VS(ft) I NS(ft) I EW(R) I DLS(°/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 0 It E s • Report Date: 7/23/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Fi 16 Q I ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/t) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 84 Days From Spud: 84 Daily Operation:7/22/2003 06:00-7/23/2003 05:59 Operations at Report lime Proposed Activity 24hrs TOH W/3 1/2 TBG.L/D SAME TEST BOPE.P/U&RIH W/4"HT&OVERSHOT. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 10.50 CC CIRC&WORK PIPE,ATTEMPT T/FREE TBG.N/G.R/D PTS EQUIP&CLEAR DECK.UNLOAD APRS& FISHING EQUIP.F/BOAT. 16:30 4.50 SL RIG UP APRS.P/U 20 K OVER UP WT T/190K.LOCATE&CUT TBG @ 11,984 WLM. 21:00 3.50 SL POH W/APRS,COULD NOT PASS 11,946,FREE DN. WORK LINE.N/G.WORK LINE TENSION UP F/1700 T/ 3400 LBS&PULL OUT OF ROPE SOCKET.POH W/APRS. 00:30 1.00 TR P/U ON TUBING,FREE @ 130K UP WT,LOST 40 K WT.L/D"WET TBG" 01:30 4.50 TR PUMP DRY JOB.TOH LAYING DN 3 1/2 TBG. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/100f') pH Gel(10sec)(Ibf/100ft') Gel(tOmin)(IbEt00ft') KCL BRINE 8.50 42 I 9.0 WL(mU30min) HTHP(mL/30... Pm(mL/mL) Pf(mL/mL) Mf(mUmL) 'Filter Cake(1/32") 1Electric Stab(V)10(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 0 Mud Check Depth:18,082.0 ftKB Mud Type 1MW(lb/gal) IFV(s/qt) PV Override(cp) VP(Ibf/100ff) IpH Gel(10sec)(Ibf/100ft') IGel(tOmin)(Ibf/t00ft') WL(mL/30min) I HTHP(mL/30... Pm(mL/mL) Pf(mUmL) Mf(mL/mL) (Fitter Cake(t/32") -Electric Stab(V)IO(%) W(%) Oil Water Ratio MBT(lb/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) ICa(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) 'Total Depth Drilled by Bit...'Cum Bit hrs...Total Avg RO... Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed, On Lac Note FUEL 296. - 24,835.0 SAFETY CHECKS-JSA Date Type Des Com 7/23/2003 Rams Test Rams Presure:3000 SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(11KB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 OR s • Report Date: 7/24/2003 t. r FOREST OIL CORPORATION AFE&Cost Type:035541 19 16 o l,%.. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/R) Grade (SOB) (ND)(ROB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(f/hr): Report Number: 85 Days From Spud: 85 Daily Operation:7/23/2003 06:00-7/24/2003 05:59 Operations at Report Tme Proposed Activity 24hrs PICKING UP HT 40 DP,TIH W/OVERSHOT. FISH F/3 1/2 L-80 TUBING STRING.TOH. Remarks Mud Logging Summary Background Gas Connectrion Gas 'Trip Gas Max Gas DAILY CONTACTS I Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 12.00 TR TOH W/3 1/2 TUBING WHILE WORKING BOAT.L/D 381 JTS&9.75 STUB.DRIFT LAST 10 JTS,NO OBSTRUCTION FOUND. 18:00 0.50 RS SERVICE RIG. 18:30 4.00 PT TEST BOPE.250/3000 PSI.AOGC WAIVED WITNESSING. 22:30 2.50 TR MK UP FISHING BHA.5 3/4 OS.W/3 1/2 BG.9 4 3/4 DC'S,BUMPER SUB,OIL JAR,ACC JAR. 01:00 5.00 TR P/U HT 40 DP,DRIFT,TIH. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100f) pH Gel(10sec)(Ibf/100R') 'Gel(10min)(Ibf/100th) KCL BRINE 8.50 44 9.0 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pt(mUmL) I Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 10.01 88.0 10.2/89.8 MBT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(11a/bbl) LCM 'Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100R) 'pH GuI(t Dcec)(Ibf/100R) 1Gel(10min)(Ibf/100R) WL(mL/3Omin) HTHP(mU30... Pm(mUmL) 1Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) 0(%) W(%) 1Oil Water Ratio MST(Ib/bbl) Sol(%) Sd(%) 1 LOS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbi) LCM 1 Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ROB) Total Depth Drilled by Bit...'Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump ft Make Model Stroke(in) Liner Size(in) P Max(psi) VolStk(bbl/stk) PUMP CHECKS Pump B Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 148.0 - 24,983.0 SAFETY CHECKS-JSA Date I Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Pam(°) I NO(ftKB) I VS(R) I NS(R) I EW(R) l DLS(°/1008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IDReport Date: 7/25/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(Ib/R) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 86 Days From Spud: 86 i Daily Operation:7/24/2003 06:00•7/25/2003 05:59 Operations at Report Tree Proposed Activity 24hrs POH WITH OVERSHOT FISHING. Remarks Mud Logging Summary Background Gas (Connectrion Gas 'Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG Front HRS.(hr) CODE SUB CODE Description OP 06:00 4.50 Fl Pick up 4"drill pipe work string with overshot. 10:30 3.50 Fl Engage fish at 11984'.Jar on fish.No movement. 14:00 0.50 Fl Test casing to 3000 psi.Good test. 14:30 13.00 Fl Rig up and run 1"free point tool.Would not enter top of fish.POH. 03:30 2.50 Fl Release overshot and POH. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ffi) Gel(10sec)(Ibf/lSOft') Gel(10min)(Ibfll OOft') KCL BRINE 8.60 44 1 pH 9.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Filter Cake(1/37) -Electric Stab(V) 0(%) 1W(%) Oil Water Ratio 10.01 88.0110.2/89.8 MBT(Ib/bbl) Sol(%) Sd(%( LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) 1 Mud Lost to Surface(bbl) 2.01 0 1 Mud Check Depth:18,082.0 ftKB Mud Type 'MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ffi) pH Gel(i Osec)(Ibf/100ft') Gel(10min)(Ibf/10oft') WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) 1 W(%) Oil Water Ratio MBT(1b/1.1) Sol(%( 1Sd(%) 1 LGS(%( Chl(mg/L) CaCI(ppm) Ca(mg/L) 'Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) 1 Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) 1Total Depth Drilled by Bit...lCam Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model _ Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump S Strokes(spm) P(psi) Eff)%) Slow Spd MUD USAGE One Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ina(°) I Awe(°) I TVD(ftKB) I VS(ft) ( NS(ft) I EW(ft) I DLS(°/100R) www.peloton.com Page 1/2 Report Printed: 7/31/2012 o R F s • Report Date: 7/26/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 16 o I Daily Drilling Report t. Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) WILen(Ibttl) Grade (RKB) (ND)(ftKe) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 87 Days From Spud: 87 Daily Operation:7/25/2003 06:00-7/26/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH WITH OVERSHOT FISHING Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG Freer HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 Fl POH with overshot.Drift drill pipe to 2.5" 08:00 1.50 Fl Lay down fishing assembly. 09:30 3.00 Fl Run 4.55"impression block on slick line.Tubing cut off is misshapened with limited inside diameter. 12:30 3.00 Fl Machine Bakers dress off mill for 3.5"tubing 15:30 4.50 Fl RIH with tubing dress off mill. 20:00 0.50 Fl Polish off fish at 11984'. 20:30 5.00 Fl POH.Mill showed good wear pattern. 01:30 2.00 Fl Run slick line 2.3"grapple to retrieve chemical cutter inside tubing.Would not enter top of tubing. 03:30 2.50 Fl Run slick line 4.55"impression block.Little impression made due to shavings bed. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type I MW(lb/gal) I FV(s/qt) PV Override(cp) YP(Ibf/1001B) pH Gel(10sec)(Ibf/100R') Gel(10min)(Ibf/100R') WL(mL/30min) HTHP(m1130...I Per(mL/mL) Pf(mL/mL) IMf(mL/mL) Filter Cake(1/37) Electric Stab(V) O(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) I LGS(%) Chl(mg/L) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) (Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spin) P(psi) EP(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cont On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com 7/26/2003 BOP Drill SURVEY DATA Dale I MD(ftKB) I led(°) I Hoot(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(R) I DLS(°/100R) www.peloton.com Page 1/2 Report Printed: 7/31/2012 ■ Q R,£s • Report Date: 7/27/2003 4 A FOREST OIL CORPORATION AFE&Cost Type:035541 Q 14 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)((KB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 88 Days From Spud: 88 Daily Operation:7/26/2003 06:00-7/27/2003 05:59 Operations at Report Time Proposed Activity 24hrs JAR ON FISH FISHING. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas 'Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.50 Fl RIH with overshot and jars on drill string. 10:30 1.50 RS Cut and slip drilling line.Service rig. 12:00 6.00 Fl Set overshot on fish.Circulate and work pipe while BJ Services mixes and delivers acid. 18:00 1.00 Fl Pump 14.5 bbls BJ Service's"one shot acid"around tail of fish. 19:00 2.00 Fl Allow acid to saturate. 21:00 5.50 Fl Move acid by the fish 1 bbl each 30 min.411'total. 02:30 1.50 Fl Jar on fish.No movement. 04:00 2.00 Fl Move acid up hole to surround second gas lift mandrel.Allow to saturate. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Oveeide(cp) YP(Ibf/1o0ft1) pH Gei)l Uses)(Ibf/100f) Gel(10min)(IbE10aft') KCL BRINE 8.60 45] 9.0 WL(MJ30min) HTHP(mL/30... Pm Win)L) Pf(mUJmL) Mf(mUmL) Filter Cake(1/32") `Electric Stab(V) O(%) W)%) Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(Ib/bbl) Sol)%) Sd(%) LGS)%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 I I 0 Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(op) VP(Ibf/100ft') pH Gel(10sec)(Ibf/1001t') 'Gel(10min)(Ibf/l Soft') WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mL/mL) 'Mf(mL/mL) (Fitter Cake(1/320 Electric Stab(V) 0(%( W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(%) LGS(%( Chl(mg/L) CaCI(ppm) 'Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) 'Make Model SN IADC Codes 'Depth In(ftKB) Total Depth Drilled by Bit...'Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC At Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Inc CONSUMABLES Supply Item Des Consumed Cum On Lob Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD((KB) I Ind(°) I Azm() I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100(t) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R E s • • Report Date: 7/28/2003 T FOREST OIL CORPORATION AFE 8,Cost Type:035541 9 'i o ` Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 89 Days From Spud: 89 Daily Operation:7/27/2003 06:00-7/28/2003 05:59 Operations at Report TIN Proposed Activity 24hrs FISH WITH SLICK LINE. FISHING. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 Fl Jar on fish with acid spotted in stuck area.No movement. 06:30 2.00 Fl Circulate acid from well. 08:30 2.50 Fl Run 1.75"impression block on slick line.Results show clear impression of rope socket at 14299'. 11:00 7.50 Fl Run free point.Pipe is free to 14280'. 18:30 5.50 Fl Unlatch overshot.Pull drill pipe from hole. 00:00 3.00 Fl Run 2.33"latching tool with 2.75"centralizer on slick line.Would not pass 13007'. 03:00 3.00 Fl Latch rope socket at 14299'with 1.3125"tool.Pull on fish.POH. - MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YIP(Ibf/100ft) pH I Gel(10sec)(Ibf/10INt') Gel(10min)(Ibf/100tH) KCL BRINE I 8.60 38 9.0 WL(mL/30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(% Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(Ib/bbI) Sol(%) ISd(%) LOS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 Mud Check Depth:18,082.0 ftKB Mud Type I MW(lb/gal) I FV(s/qt) PV Ovenide(cp) YP(Ibf/100W) pH Gel(10sec)(Ibf/10INt') Gel(10min)(Ibf/100ft') WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) IMf(mUmL) Fitter Cake(1/32") Electrio Stab(v)IO(% W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Sd(% LGS(%) Chi(mg/L) Gael(ppm) Ca(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN IIADC Codes Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Nozzles(1/32") IIADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Matt(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Lac CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I ND(ftK8) I VS(ft) I NE(ft) I EW(ft) I DLS(°/lDDft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 a Rt J• • • Report Date: 7/29/2003 1/4,,,,. FOREST OIL CORPORATION AFE&Cost Type:035541 xi • I ). Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL LeaselOp Area: Set Depth Set Depth EMW APIIUWI:50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (TVD)(SOB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 90 Days From Spud: 90 Daily Operation:7/28/2003 06:00-7/29/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIG TO CUT TUBING. FISHING Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 Fl Run 4.55"impression block on slick line to top of fish at 11984'.Well is clear. 08:00 3.00 Fl Run 2.33"JU latching tool.Catch fish at 14299'.Pulled off of fish. 11:00 7.50 Fl Catch inside fish with 2"JD tool.Line parted after jarring.Splice line&POH.Rig down slick line. 18:30 1.00 Fl Make up fishing tools on drill pipe. 19:30 3.50 Fl RIH with overshot.Latch fish at 11984'. 23:00 1.00 Fl Circulate drill string volume. 00:00 6.00 Fl RIH with 2 3/8"chemical cutter.Tag inside fish at 14287'. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) (s/qt) PV Override(cp) YP(Ibf/100/5) pH Gel(10sec)(Ibf/100f1') Gel(10min)(IM/100ft') KCL BRINE 8.60 FV 36 I 9.0 WL(mU30min) HTHP(mL/30... Pm(mL/rnL) Pf(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(Ib/bbl) ISoi(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) I Mud Lost to Surface(bbl) 2.0 0 Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/1001') pH Cel(10sec)(Ibf/1001') Cel(10min)(Ibf/100111) WL(mL/30min) HTHP(mU30...I Pm(mUmL) IPf(mUmL) Mf(mUmL) Fitter Cake(1/32") -Electric Stab(V)10(%) W(%) Oil Water Ratio MBT(Ib/bbl) Sol(%) Isd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model ISN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...I Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) I Liner Size(in) P Max(psi) Vol/Stk(bbi/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Dale I MD(ftKB) I Ind(°) I Avon(°) I TVD(R1(13) I VS(ft) I NS(ft) I EW(ft) I DLS(1/1005) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • R E Report Date: 7/30/2003 �,A FOREST OIL CORPORATION AFE&Cost Type:035541 o t Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMw API/UWI: 50-733-20506-01 County: OD(in) WI/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 91 Days From Spud: 91 Daily Operation:7/29/2003 06:00-7/30/2003 05:59 Operations at Report Time Proposed Activity 24hrs FISHING AT 14263'. FISHING Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office I Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.00 Fl Chemical cut tubing at 14257'.Rig down wire line. 10:00 2.00 Fl Circulate bottoms up. 12:00 10.00 Fl POH.Lay down 71 joints and two gas lift mandrils of recovered fish. 22:00 7.00 Fl RIH with jars and overshot. 05:00 1.00 Fl Wash down to fish.Begin jarring.Top of fish at 14263'. MUD PROPERTIES Mud Check Depth:<Depth?> Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Geld Osec)(Ibf/100ft') IGeI(lOmin)(Ibf/100ft') KCL BRINE I 8.60 35 9.0 WL(mU30min) I HTHP(mL/30... Pm(mUmL) I Pf(mUmL) Mf(mUmL) Fitter Cake(1/321 Electric Stab(V) 0(%) W)%( Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(1b/bbl) Sol(%) Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) Ca(mg/L) Lime(1b/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 Mud Check Depth:18,082.0 ftKB Mud Type IMW(lb/gal) IFV(s/qt) PV Override(ep) 'VP(Ibf/1001P) pH Gel(tOsec)(Ibf/100f) GeldOmin)(Ibf/100f) WL(mL/30min) HTHP(mU30... Pm(mUmL) Pf(mUmL) IMf(mUmL) Filter Cake(1/32") -Electric Stab(V) 0(%) W(%) Oil Water Ratio MBT(1b/bbl) Sol(%) I Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/gbh LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes IDepth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type I Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I a"") I DLS 0100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R 6 1111 • Report Date: 7/31/2003 K FOREST OIL CORPORATION AFE&Cost Type:035541 1 15 o Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 ' Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 92 Days From Spud: 92 Daily Operation:7/30/2003 06:00-7/31/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH W/OUTSIDE PIPE CUTTER. FISHING Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 8.00 Fl Jar on fish at 14263'.No Movement. 14:00 6.00 Fl POH.Lay down fishing tools. 20:00 0.50 RS Derrick inspection. 20:30 3.50 PT Test BOP. 00:00 4.50 Fl RIH with 128'of wash pipe with out side pipe cutter. 04:30 1.00 RS Cut drilling line. 05:30 0.50 Fl RIH with outside pipe cutter. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(10sec)(Ibf/10IN1') Gel(1 emirs)(Ibf/100ft') 8.60 9.0 WL(mL/30min) HTHP(mL/30.. Pro(mUmL) I Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") II.Electric Stab(V)'O(%) W(%( Oil Water Ratio 10.0 88.0110.2/89.8 MBT(lb/bbl) Sol(%( Sd(%) LGS(%) Chl(mg/L) I CaCI(ppm) ICa(mg/L) Lime(Ib/bbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make I Model SN I IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/321 I IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vel/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Dale Type Des Corn SURVEY DATA Dale I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) r VS(ft) I NS(ft) I EW(ft) I DLS(°/100 t) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R-E s III • Report Date: 8/1/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 '9 16 o l `; Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: P Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(Ib/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 93 Days From Spud: 93 Daily Operation:7/31/2003 06:00-8/1/2003 05:59 Operations at Report Time Proposed Activity 24hrs ATTEMPT TO LATCH ONTO FISH AT 14263 Remarks Mud Logging Summary Background Gas 'Connection Gas Trip Gas Max Gas DAILY CONTACTS - Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 1.00 Fl RIH W/OUTSIDE CUTTER&WASH OVER FISH AT 14263 TO 14317(COULD NOT GO PAST 14317 07:00 1.50 Fl WORK CUTTER-ATTEMPT TO CUT TBG AT 14311(APPEARED TO BE CUT) 08:30 5.50 Fl POH 14:00 1.50 Fl LAY DN WASH PIPE(NO FISH)EVIDENCE OF POSSIBLE COLLAPSED CSG 15:30 0.50 RS Normal Rig service 16:00 4.00 PT LAY DN 4 3/4 DC'S R/U BJ-PJSM 20:00 1.00 PT PULL WEAR RING-RUN TEST PLUG-TEST LINES,RISER&BLINDS TO 5000 PSI 21:00 4.00 PT PRESSSURE UP WELL IN 500 PSI INCREMENTS TO ESTAB INJECTION RATE OF 3 BPM AT 4950 PSI- PUMPED TOTAL OF 74 BBL-GOT BACK 23 BBL 01:00 4.50 TR P/U OVER SHOT DRESSED W/3 1/2 GRAPPLES-RIH 05:30 0.50 Fl BREAK CIR-ATTEMPT TO WORK OVER FISH AT 14263 MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100R') Gel(lomin)(Ibf/100R) 1 8.701 9.0 WL(mU30min) 1HTHP(mL/30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Fitter Cake(1/32") -Electric Stab(V)10(%) W(%) Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(Ib/bbl) Sol(%) 2 0 Sd)%) 1 LGS(%( Chi(mg/L) o1 CaCI(ppm) Ca(mg/L) Lime(lb/bbl) 1LCM Mud Lost to Hole(bbl) 1 Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) 'Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1/32") 11ADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°f100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 8/2/2003 A FOREST OIL CORPORATION AFE&Cost Type:035541 S, Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD On) Wt/Len Blelft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 ' Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): - Report Number: 94 Days From Spud: 94 Daily Operation:8/1/2003 06:00-8/2/2003 05:59 Operations at Report Time I Proposed Activity 24hrs POH W/WASH PIPE LOOK AT BURNING SHOE I Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 5.00 Fl LATCH ONTO FISH AT 14263-WORK&PULL ON FISH-UNABLE TO FREE ANYTHING 11:00 0.50 Fl RELEASE OVERSHOT F/3 1/2 TBG FISH AT 14263 11:30 6.00 TR POH W/OVERSHOT 17:30 2.00 TR M/U BURNING SHOE-5 JTS 5 3/4"WASH PIPE-BUMPER SUB&JARS-(9)4 3/4"DC'S-ACC JARS 19:30 4.50 TR RIH 00:00 3.00 Fl WASH OVER 3 1/2 TBG AT 14263 TO 14317-MILLED F/14317 TO 14319 03:00 1.50 CC PUMP SWEEP&DRY JOB 04:30 1.50 TR POH MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) I FV(s/qt) PV Override(cp) YP(Ibf/1 Soft') pH Gel(10sec)(Ibf/10oft') Gel(10min)(Ibf/100ft') 8.70 9.0I WL(mU30min) HTHP(mL/30... Pm(mUmL) IN(mUmL) I MI(mUmL) Filter Cake(1/32") °Electric Stab(V) O(%) W(%) I Oil Water Ratio 10.0 88.0110.2/89.8 MBT(lb/bbl) Sol(%) 2 O Sd(%) LGS(%) I Chl(mg/L) 0 CaCI(ppm) ICa(mg/L) I Lime(Iblbbl) LCM I Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In((KB) Total Depth Drilled by Bit...Cum Bit hrs...I Total Avg RO... Nozzles(1132") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) EH(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/10011) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R E m • ! Report Date: 8/3/2003 `x" FOREST OIL CORPORATION AFE&Cost Type:035541 o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(11a/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: ND(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 95 Days From Spud: 95 Daily Operation:8/2/2003 06:00•8/312003 05:59 Operations at Report Time Proposed Activity 24hrs LAYING DN 4"DRILL PIPE Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Mao Gas DAILY CONTACTS - Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 6.50 TR POH W/BURNING SHOE&WASH PIPE 12:30 0.50 RS SERVICE TOP DRIVE,CROWN,BLOCKS&DRAW WORKS 13:00 4.00 LO GET SCHLUMBERGER USIT TOOL READY&FLOWN OUT F/SCHLUMBERGER'S YARD 17:00 10.00 LO PJSM-RUN USIT LOG F/10250 TO 9365 03:00 0.50 Fl LAY DN WASH PIPE 03:30 2.50 TR RIH W/4 3/4 DC'S&4"DRILL PIPE&LAY DN SAME - MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(cp) VP(Ibf/10oft') pH GeldOsec)(Ibf/1 OOft) Geld 0min)(Ibf/10oft') 8.70 9.0 WL(mL/30min) HTHP(mL/30...'Pm(mUmL) IPt(mUmL) Mf(mUmL) Filter Cake(1/32") 1 Electric Stab(V)10(%) 1W(%) !Oil Water Ratio 10.0 88.0110.2/89.8 MST(Ib/bbl) ISoI(%) Sd(of) LGS(%) Chl(mg/L) 1CaCl(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) (Mud Lost to Surface(bbl) 2.0 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit..,Cum Bit hrs...Total Avg RO... Nozzles(1/321 IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) VoUStk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Dale I MD(ftKB) I Ind(q I Azm(°) I ND(ftKB) t VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 8/4/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 lar Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (SKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 ' Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 96 Days From Spud: 96 Daily Operation:8/3/2003 06:00-8/4/2003 05:59 ' Operations at Report Time Proposed Activity 24hrs RIH W 4.5'IMPRESSION BLOCK ON SLICK LINE ATTEMPT TO FISH Remarks Mud Logging Summary Background Gas Connecteon Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Desaiptlon OP 06:00 4.00 TR FINISH LAYING DN 4"DP,9 DC'S,JARS&BUMPER SUB 10:00 5.00 TR M/U BAKER OUTSIDE CUTTER,BHA&DP 15:00 1.00 RS SLIP&CUT DRILL LINE 16:00 3.00 TR RIH 19:00 2.00 Fl WORK OVER FISH&ATTEMPT TO CUT 3 1/2 TBG AT 14311 21:00 5.50 TR POH 02:30 1.00 TR L/D FISH(49.65'OF 3 1/2 TBG)&WASH PIPE 03:30 2.50 SL R/U POLLARD WIRELINE RUN 4.5"IMPRESSION BLOCK MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) 'FV(s/qt) PV Override(cp) YP(Ibf/100ft') pH Gel(10sec)(Ibf/100ft') Gel(10min)(Ibf/100ft') 8.70 9.0 WL(mU30min) HTHP(mL/30...'Pm(mUmL) Pf(mUmL) 'Mf(mUmL) Filter Cake(1/32") Electric Stab(V)'O(%) W(% Oil Water Ratio 10.0 88.0 10.2/89.8 MOT(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) Cad'(ppm) Ca(mg/L) Lime(Ib/bbl) ILCM Mud Lost to Hole(bbl) 'Mud Lost to Surface(bbl) 2.0 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(SEE) 'Total Depth Drilled by Bit...Cum Bit Ers...Total Avg RO...'Nozzles(1/32) IAOC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(% Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed, On Lou Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I 1"(') 1 Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O..R:£s • • Report Date: 8/5/2003 FOREST OIL CORPORATION AFE&Cost Type:035541 t6 o I %. Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: p Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 97 Days From Spud: 97 Daily Operation:8/4/2003 06:00-8/5/2003 05:59 Operations at Report Time Proposed Activity 24hrs RUN APRS COLLAR LOCATOR(1.0") Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 3.00 SL RUN 2.5"IMPRESSION BLOCK TO 14285'&POH 09:00 5.00 SL DRESS&RIH W/WIRELINE OVERSHOT-LATCH ONTO FISH AT 14281'(WLM)-POH W/SLICK LINE-L/D CHEMICAL CUTTER&FISHING TOOLS 14:00 7.00 SL M/U 1.70 IMPRESSION BLOCK-RIH-TAG TOP TBG 14311'(WLM)-WORK PAST TOP OF TBG TO 14321'(WLM)-POH-APPEARED TO HAVE BEEN ALONG OUTSIDE OF TBG 21:00 4.50 TR M/U OVERSHOT ON DRILL PIPE-RIH 01:30 0.50 TR WASH TO FISH-TAG&LATCH ONTO FISH AT 14313(ABLE TO PUMP THRU FISH) 02:00 4.00 Fl R/U&RUN APRS W/1.0"COLLAR LOCATOR-(1.0"COLLAR LOCATOR STOPS 29'BELOW TOP OF FISH) TOP OF FISH DPM 14313'-WLM 14342'-SET DN WLM 14371' MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type I MW(lb/gap FV(s/qt) PV Override(cp) YP(Ibf/1001) pH Gel(10sec)(Ibf/100(0 IGel(10min)(Ibf/1001') 8.70 9.0 WL(mU3Omin)I HTHP(mL/30...I Pm(mUmL) 'Pt(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 10.0 88.0110.2/89.8 MOT(lb/bbl) I Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 I I BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Sit.. Cum Bit hrs...I Total Avg RO..,'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/1001) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • • Report Date: 8/6/2003 IA FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (lb/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 98 Days From Spud: 98 Daily Operation:8/5/2003 06:00-8/6/2003 05:59 Operations at Report Time Proposed Activity 24hrs RIH W/5 3/4 O.S.W/3 1/2 GRAPPLES JARRING ASS'Y JAR ON FISH Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 Fl FINISH POH W/1.0"COLLAR LOCATOR 08:30 11.50 SL R/U POLLARD.125 SLICK LINE-RUN 1.70"IMPRESSION BLOCK,STOPPED AT 14345'WLM(INDICATION OF BEING PINCHED)-RUN A 1.0"IMPRESSION BLOCK,STOPPED AT 14345'WLM(INDICATES BEING PINCHED)-RUN 1.0"DRIVE ON BAILER(NO SOLIDS IN BALER)-THE BTM OF BALER WAS EGGED-IT STOPPED AT 14345'ALSO 20:00 6.50 TR RELEASE OVERSHOT F/FISH-POH 02:30 1.50 TR UD OVERSHOT P/U BHA 04:00 2.00 TR RIH W/OVERSHOT&JARRING ASS'Y MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) I FV(s/qt) PV Override(cp) VP(Ibf/100ft') pH Gel(losec)(Ibf/100ft') Gel(10min)(Ibf/100fF) 8.70 9.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mt(mUmL) Fitter Cake(1/32") -Electric Stab(V) O(%) IW(%) Oil Water Ratio 10.01 88.0 10.2/89.8 MBT(Ib/bbl) Sol(%) ISd(%) I LGS(%) IChI(mg/L) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM 'Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.01 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN I IADC Codes 1Depth In(EKE) Total Depth Drilled by Bit...Cum Bit hrs...(Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS I Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spur) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS•JSA Date Type Des Com SURVEY DATA Dale I MD(ftKB) I led(°) I Azm(°) I TVD(ftKB) I VS(n) I NS(n) I EW(ft) I OLE(°noon) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 8/7/2003 4011 FOREST OIL CORPORATION AFE&Cost Type:035541 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW APIIUWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(flKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 99 Days From Spud: 99 Daily Operation:8/6/2003 06:00-8/7/2003 05:59 Operations at Report Time POH Activity 24hrs POH W/5 3/4 OVERSHOT DRESSED W/3 1/2 GRAPPLES FISHING AT 14321'F/3 1/2"TBG Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.50 Fl RIH W/OVERSHOT&JARRING ASS/Y 08:30 1.00 Fl WASH OVER FISH AT 14313'-JARRED ON FISH W/70K OVER PULL-PULLED FREE 09:30 6.00 Fl POH-LAY DN FISH(8.6'PIECE OF 3 1/2 TBG)FISH HAD BEEN SLICED ON THE LAST FOOT,ON ONE SIDE 15:30 3.00 PT TEST BOP'S-250&3000 PSI(TOM MAUNDER W/AOGCC WAIVED THE WITNESSING OF THE BOP TEST) 18:30 0.50 RS SERVICE CROWN,BLOCKS&DW 19:00 1.00 Fl - M/U 5 3/4"OVERSHOT DRESSED W/3 1/2 GRAPPLES&5 3/4"HOLLOW MILL W/3 1/2"CARBIDE INSERT W/5 3/4"BY 4 15/16 ID CUT LIP GUIDE 20:00 4.00 Fl RIH TO 10700' 00:00 1.00 RS SLIP&CUT DRILLING LINE 01:00 1.00 Fl FINISH TIH 02:00 1.00 Fl WASH DN TO 14317'-START TAKING WT-SET DN 20K-P/U&ROTATE DN-STALLED OUT&TAKING WT AT 14317-SET DN 40K(TOP OF FISH AT 14321') 03:00 3.00 Fl POH MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) IFV(s/qt) PV Ovenide(cp) VP(Ibf/100(t') pH GeldOsec)(Ibf/1001[') Gel(10min)(Ibf/100ft') 8.701 9.0 WL(mU3Omin) HTHP(mL/30... Pm(mUmL) Pf(mUmL) AM(mUmL) Fiber Cake(1/32") Electric Stab(V) O(% W(%) Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(lb/bbl) I Sol(% Sd(%) LGS(%) Chi(mg/L) CaCI(ppm) ICa(mg/L) -Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) (Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...I Cum Bit hrs.. Total Avg RO...'Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model I Stroke(n) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) ER(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Lac Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) I Awn(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100b) www.peloton.com Page 1/2 Report Printed: 7/31/2012 III • Report Date: 8/8/2003 Pi FOREST OIL CORPORATION AFE&Cost Type:035541 0 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(kKB): Footage Drilled(kKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 100 Days From Spud: 100 Daily Operation:8/7/2003 06:00-8/8/2003 05:59 Operations at Report Tme Proposed Activity 24hrs ,', PREP HOLE F/DOWN-HOLE CAMERA (RUN ON-HOLE CAMERA Remarks , Mud Logging Summary Background Gas I Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 4.00 TR POH-LAY DN 5 3/4 OVERSHOT DRESSED W/3 1/2 GRAPPLES(NO RECOVERY) 10:00 9.00 SL R/U POLLARD SLICK LINE-RUN 4.5"IMPRESSION BLOCK TO 14318'(WLM) 19:00 5.50 TR M/U BHA-RIH W/CUT-OFF JT OF 2 3/8 TBG ON BTM 00:30 0.50 TR WASH 2 3/8 TBG INTO 3 1/2 TBG AT 14321-WASH DN TO 14325' 01:00 5.00 Fl PREP WELL F/CAMERA RUN(DHV) MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type FV(s/qt) PV Override(cp) YP(Ibf/100ft) pH Gel(10sec)(Ibf/100R") Gel(10min)(Ibf/1 Dots) 1 MW(lb/gal) 8.70 J l 9.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pt(mUmL) Mf(mUmL) Filter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 10.01 88.0110.2/89.8 MST(Ib/bbl) Sol(%) Sd(%) Cad!(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 1 LGS(%) Chl(mg/L) 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model ISN IADC Codes I Depth In(ftKB) Total Depth Drilled by Bit...I Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Etf(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On L. Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I Ind(°) Azm(°) I ND(ftKB) I VS(R) I NS(R) I EW(R) I DLS(°/1008) www.peloton.com Page 1/2 Report Printed: 7/31/2012 IIIReport Date: 8/9/2003 Imo► FOREST OIL CORPORATION AFE&Cost Type:035541 C3 Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) WI/Len(IbRI) Grade (11KB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 101 Days From Spud: 101 Daily Operation:8/8/2003 06:00-8/9/2003 05:59 Operations at Report Time Proposed ActOity 24hrs POH W/4 11/16 OVERSHOT&JUNK BASKETS LOOK AT RECOVERY Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas I Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 2.00 CC PREPARE F/CAMERA RUN 08:00 7.00 TR POH-LAY DN 2 3/8 MULE SHOE 15:00 2.00 TR M/U 4 11/16"OVERSHOT DRESSED-W/3 1/2 SPIRAL GRAPPLES-2 JUNK BASKETS 17:00 5.00 TR TRIP IN HOLE 22:00 4.50 Fl CIR&ROTATE F/14310'-ENCOUNTER OBSTRUCTION AT 14317'-WORK&MILL DN TO TOP OF FISH AT 14321-MILL OVER FISH TO 14326(PUMP HI-VIS SWEEP)-SLACK OFF TO 14329 W/15K STACKED ON IT- ATTEMPT TO CATCH FISH WI OVERSHOT 02:30 1.50 CC CIR SWEEP TO SURFACE 04:00 2.00 TR POH MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(Ib/gal) FV(s/gt) PV Override(cp) VP(Ibf/100ft) pH Gel(10sec)(Ibf/100ft') Gel(10mit)(Ibf/100ft') 8.80 J 9.0 WL(mU30min) I HTHP(mL/30...I Pm(mUmL) I Pf(mUmL) Mf(mUmL) Fitter Cake(1/32") Electric Stab(V) O(%) W(%) Oil Water Ratio 10.01 88.0 10.2/89.8 MBT(lb/bbl) Sol(%) Sd(%) CaCI(ppm) Ca(mg/L) Lime(Ib/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 1 LGS(%) Chl(mg/L) 0 1 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ft<B) 'Total Depth Drilled by Bit...TCum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(H) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Six] MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD((KB) I Ind(°) I Awe(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O R.e a S • Report Date: 8/10/2003 kiii.A. FOREST OIL CORPORATION AFE&Cost Type:035541 I 16 o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(ftKB): 0 5/8/2003 Target Formation: TVD(ftKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 102 Days From Spud: 102 Daily Operation:8/9/2003 06:00-8/10/2003 05:59 Operations at Report Time Proposed Activity 24hrs LAYING DN HT-40 DRILL PIPE 'Proposed TBG HGR&SET BPV-N/D BOP'S&N/U TREE Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 6.00 Fl P01-1W/4 11/16"OVERSHOT DRESSED W/3 1/2 SPIRALGRAPPLES-LAY DN FISH(RECOVERED 9' TWISTED PIECE OF 3 1/2"TBG&5.25'SLICE OF 7 5/8 CSG W/BUTTRESS THREAD ON THE PIN- RECOVERED METAL&FORMATION IN JUNK BASKETS) 12:00 2.50 TR LAY DN FISHING TOOLS&ALL OF BHA 14:30 4.50 TR RIH W/4"DRILL PIPE 19:00 11.00 TR LAY DN HT-40 DRILL PIPE MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type MW(lb/gal) FV(s/qt) PV Override(up) 1P(Ibf/100fP) pH I Gel(10sec)(Ibf/100fe) Gel(10min)(Ibf/100ft') 8.80 9.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) I Pt(mUmL) Mf(mUmL) Fitter Cake(1/32") -Electric Stab(V)IO(%) I W(%) Oil Water Ratio 10.0 88.0 10.2/89.8 MBT(lb/bbl) Sol(%) I Sd(%) I LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(lb/bbl LCM Mud Lost to Hole(bbl) I Mud Last to Surface(bbl) 2.01 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) I Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...I Cum Bit hrs...Total Avg RO... Nozzles(1/32") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eft(%) Slow Spd MUD USAGE Des Consumed On Lac CONSUMABLES Supply Item Des Consumed Cum On Loo Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Corn SURVEY DATA Date I MD(SIB) I Ind(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS 0100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 O fl 6 III • Report Date: 8/11/2003 s FOREST OIL CORPORATION AFE&Cost Type:035541 o I Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: Field Name: REDOUBT SHOAL Lease/Op Area: CASING PROGRAM P Set Depth Set Depth EMW API/UWI:50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (TVD)(ftKB) Run Date (1b/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 103 Days From Spud: 103 Daily Operation:8/10/2003 06:00-8/11/2003 05:59 Operations at Report Time Proposed Activity 24hrs DEMOB FROM RU#4A. LEG TO LEG MOVE. Remarks Mud Logging Summary Background Gas Connection Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 0.50 TR Lay down drill pipe. 06:30 3.50 BP Set Tubing Hanger and test seals. 10:00 5.50 BP 'ND BOP. 15:30 2.50 BP Set tree and test to 4500 psi.Pull BPV. 18:00 12.00 MO Clean pits and inject waste fluids.Demob from RU#4A. MUD PROPERTIES Mud Check Depth:18,082.0 kKB Mud Type I MW(lb/gal) I FV(s/qt) J PV Override(cp) r Obi/1005i) pH Gel(10sec)(Ibf/100f1') I Gel(10mie)(Ibf/100f1') 8.80 9.0 WL(mU30min) HTHP(mL/30...I Per(mUmL) Pf(mUmL) I Mf(mUmL) Filter Cake(1/37') Electric Stab(V) O(%) W(%) Oil Water Ratio 10.0 88.0 10.2/89.8 MU(Ib/bbl) Sol(%) Sd(%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) Lime(113/bbl) LCM Mud Lost to Hole(bbl) Mud Lost to Surface(bbl) 2.0 I 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...I Cum Bit hrs...I Total Avg RO... Nozzles(1/37') IADC Bit Dull PUMP OPERATIONS Pump u Make Model Stroke(m) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Loc CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Data Type Des Corn SURVEY DATA Date I MD(ftKB) I Ind(°) I Azm(°) I TVD(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS(°/100ft) www.peloton.com Page 1/2 Report Printed: 7/31/2012 • Report Date: 8/12/2003 . •k. s,W FOREST OIL CORPORATION AFE&Cost Type:035541 o l Daily Drilling Report Well Name:REDOUBT UNIT#4A Contractor: Rig Number: CASING PROGRAM Field Name: REDOUBT SHOAL Lease/Op Area: p Set Depth Set Depth EMW API/UWI: 50-733-20506-01 County: OD(in) Wt/Len(lb/ft) Grade (ftKB) (ND)(ftKB) Run Date (Ib/gal) Permit No.: State/Province: AK Surface Legal Location: Leg 3,Slot 7 5/13/2003 Proposed MD/TVD: MD(kKB): 0 5/8/2003 Target Formation: TVD(kKB): 6/22/2003 Original KB Elevation(ftKB): Footage Drilled(ftKB): Drilling Hours(hr): Avg ROP(ft/hr): Report Number: 104 Days From Spud: 104 Daily Operation:8/11/2003 06:00-8/12/2003 05:59 Operations at Report Time Proposed Activity 24hrs RELEASED RIG AT 06:00 RIG MOVE. Remarks Mud Logging Summary Background Gas Connectrion Gas Trip Gas Max Gas DAILY CONTACTS Job Contact Position Office/Rig Mobile E-mail TIME LOG From HRS.(hr) CODE SUB CODE Description OP 06:00 24.00 MO Rig down from RU#4A.Rig released At 06:00 hrs. MUD PROPERTIES Mud Check Depth:18,082.0 ftKB Mud Type I MW(Ib/gal) FV(s/qt) PV Override(cp) YP(Ib1/100f') IpH Gel(10sec)(Ibf/100ft°) Gel(10min)(bf/100/F) 8.80 9.0 WL(mU30min) HTHP(mL/30... Pm(mUmL) Pf(mUmL) Mf(mUmL) -Filter Cake(1/321 Electric Stab(V)10(%) W(%) 'Oil Water Ratio 10.0 88.0110.2/89.8 MBT(16/bbl) Sol(%) Sd)%) LGS(%) Chl(mg/L) CaCI(ppm) Ca(mg/L) I Lime(113/bbl) LCM I Mud Lost to Hale(bbl) Mud Lost to Surface(bbl) 2.0 0 BIT INFORMATION(Current and Previous 2 Runs) BHA#<stringno>,<des> Bit Run'Size(in) Make Model SN IADC Codes Depth In(ftKB) Total Depth Drilled by Bit...Cum Bit hrs...Total Avg RO... Nozzles(1132") IADC Bit Dull PUMP OPERATIONS Pump# Make Model Stroke(in) Liner Size(in) P Max(psi) Vol/Stk(bbl/stk) PUMP CHECKS Pump# Strokes(spm) P(psi) Eff(%) Slow Spd MUD USAGE Des Consumed On Los CONSUMABLES Supply Item Des Consumed Cum On Loc Note FUEL 0.0 - 24,983.0 SAFETY CHECKS-JSA Date Type Des Com SURVEY DATA Date I MD(ftKB) I led(°) I Azm(°) I ND(ftKB) I VS(ft) I NS(ft) I EW(ft) I DLS('/1001) www.peloton.com Page 1/2 Report Printed: 7/31/2012 STATE OF ALASKA RECEIVED ' AL' OIL AND GAS CONSERVATION COM ON FEB 19 2013 REPORT OF SUNDRY WELL OPERA AOGCC 1.Operations Abandon 11 Repair Well LJ Plug Perforations Le Perforate Lf Other LJ Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown p Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator COOK INLET ENERGY,LLC 4.Well Class Before Work: 5.Permit to Drill Number: Name: Development IS Exploratory❑ .• 203-081 3.Address: 601 W.5TH AVE STE 310 ANCHORAGE,AK Stratigraphic Service ❑ 6.API Number: 99501 ,- 50-733-20506-01 "'00 7.Property Designation(Lease Number): 8.Well Name and Number: • 381203,378114,374002 •• REDOUBT UNIT#4A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A REDOUBT SHOAL UNDEFINED�i/�M�GA5 11.Present Well Condition Summary: f 'l Total Depth measured 18,091 feet Plugs measured NONE feet true vertical 12,476 feet Junk measured 14,319 feet Effective Depth measured 18,082 feet Packer measured 9,057 feet true vertical 12,467 feet true vertical 6,283 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 200 30"A-36 150# 200' 200' Surface 3,530' 13 3/8"L80 68# 3,530' 2,918' 5,020 PSI 2,260 PSI Intermediate 10,517' 9 5/8"L80 47# 10,517' 7,114' 6,870 PSI 4,760 PSI Production 7 5/8"L80 29.7# 14,820' 9,565' 6,890 PSI 4,760 PSI Liner 5 1/2" L80 17# 18,082' 12,467' 7,740 PSI 6,390 PSI Perforation depth Measured depth 9,195'-9,220', 9,348-9,400, 17,784-feet 17,855' True Vertical depth 6,362'-6,376', 6,449'-6,478', feet 12,182'-12,248' Tubing(size,grade,measured and true vertical depth) 2 7/8" L80 EUE 6.3# 9,091' 6,303' HYDROW 1 9,057' 6,283' Packers and SSSV(type,measured and true vertical depth) SSSV 301' 301' 12.Stimulation or cement squeeze summary: Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 1239 0 60 1219 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run N/A Exploratory❑ Development 0 - Service ❑ Stratigraphic ❑ Daily Report of Well Operations ATTACHED 16.Well Status after work: Oil ❑ Gas ID WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 312-` '57 Contact Courtney Rust Email courtney.rust @cookinlet.net Printed Name / _A''�� �1 Title C.4-O Signature oA v ; d ('l✓i L(, Phone 90 ? - VI — 3 V£ cr Date`74 f4.9 r 3 E i Form 10-404 Revised 10/2012 aDMS r ER ° 9 t•ZiZ• I3Submit Original Only , O1 RECEIVED _ Cook Inlet Energy_ FEB 19 2013 • AOGCC February 18,2013 Ms. Cathy Foerster,Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave.,Suite 100 Anchorage,Alaska 99501 Re: Sundry Application Cook Inlet Energy,LLC: Redoubt Unit#4A Permit to Drill No:203-081 API No: 50-733-20506-01 Dear Ms.Foerster, 31Z Cook Inlet Energy(CIE)hereby submits a Sundry Completion on Redoubt Unit#4A well located in Redoubt Shoal,Cook Inlet. Included are a10-404 form,current wellbore schematic,and daily summary reports. If you have any questions,please contact me at(907)-433-3804. Sincerely, David Hall CEO-Cook Inlet Energy 601 W.5th Avenue,Suite 310,Anchorage,AK 99501 (907)334-6745*(907)334-6735 fax • • COOK INLET ENERGY RU #4 A WELL JANUARY 2013. R {-F U /� /� lJ TMill`err Rig 35 RKB 44'. < 301'SSSV < 3,019' Injection Mandril 2 7/8" 6.5# EUE L-80 tubing 5,074'TOL < 9,044'WXO Sliding Sleeve 9,057' Hydrow 1-A PKR 20' of jet cut TBG jt at 9091' 0 < Perforations 9195'to 9220' > < Perforations 9348' to 9400' > < < 77' of top fish =WLEG,TBG jt, Ported sub, �Q TBG jt, WXN & 10' cut off TBG jt. 236' of spent perforation guns with 10,000' CIBP firing bar. 25' of cement 10,517' 9 5/8"47# BTC 14,300' CIBP 14,583'TOL 14,820' 7 5/8" 29# Hyd 521 < > < Perforations 17,784- 17,855' < > < > 5.5" 17# L-80 Hydril 521, 18,082 MD • • RU4A Summary of Reports 1/2/13 Demobe from previous well.Set SSSV, continue prep. 1/3/13 Continue Prep.Check well pressures.Set BPV and Dart Valve. Begin nipple up BOPE. 1/4/13 Continue with BOPE and function tests.Good tests. 1/5/13 Test dart valve,good test. Pull Tubing Hanger and install wear ring. R/D test equipment. R/U PWS e line. M/U tool assembly. RIH t 14,322'WMP tag top of fish. POH. RIH with 7 5/8" Halliburton EXSVB Plug to 14,300' 1/6/13 Set 7 5/8" EZSVB"solid" Plug at 14,300'. RIH to 14,300'dump cement, POH w eline. Mix up 2nd Batch of cement, RIH to 14, 290' dump cement. POH. Mix up 3rd batch, RIH to 14,270',dump cement.Wait on 1st batch of cement to cure before testing.Test from 1000 psi to 2500 psi, record for 30 minutes,good test. RID Test equipment. Pollard e line crew and Halliburton tool tech install 2"solid plug to top of 2"d 7 5/8" EZSVB Plug. R/U to RIH. Check well pressure,open blind rams, RIH with 2"d 7 5/8" EZSVB plug to 10,000' and set. POH 1/7/13 RIH t/9800'w/4" Drill Pipe f/Derrick, observed Oil Returns=40 bbls in Trip Tank and transferred 10 bbls into Junk Pit behind Shakers.Transfer 70 bbls of Produced water into suction pits to circulate/ displace hole with mud pumps.Circulate down 4" Drill Pipe, monitor 50 bbls of returns(100%Oil), Confered w/Town to pump another 50 bbls or until oil cleans up 1st. Begin POH to lay down pipe. 1/8/13 Continue Laying down Drill pipe. 1/9/13 Continue Laying down Drill Pipe. R/U to pull wear ring. P/U &RIH,w/4-5/8"OD, 6 SPF,TCP Guns,3 jts, 2-7/8"tbg,7-5/8", Weatherford, Hydo set packer,X/O's,WXM Nipple,Sliding sleeve.Total length 360.28'. Ran 67,jts,2 7/8", 6.5 ppf, L-80,8rd,AB Mod,tbg, 2119.39'.Total Completion string run 2479.67' 1/10/13 • • Install Chemical injection mandrel. RIH w/2 7/8"tbg&3/8" chemical injection line,from 6390',to, 9100'. Install SSSV. Press test to 5M psi,for 10 min-OK. Install& run 1/4" SSSV line &3/8"chemical injection line,from 9100'to 9430'.Total tbg run 285 jts,9430' 1/11/13 Finishing correlating with logs. Run tubing hanger,set dummy SSSV,Circulate at 3 bbl/min adding 60 gals of Baracor 95 as per Baroid recommendation.Treated 520 bbls and stopped 12 bbl from a complete circulation. End circulation rate at 3 bbl/min at 350 psi. 1/12/13 Finish pressure testing equipment.Test hanger. 1/13/13 Good test. RIH. RU Schlumberger N2 hard lines. Rig up to pump diesel into tubing. Pump 350 gals of diesel into production tubing with returns from IA.Volume will leave 300' above the sliding sleeve and cover 100' of IA for freeze protection. Production rigging up flow line manifold.Start up N2 and pressure test lines to 3500 psi.Good test. Displace annulus with N2. Rate at 700 scfm. Increased rate to 900 scfm after 38 bbls returned.Stopped pumping N2 at 50 bbls returned. Final N2 pump pressure 2250 psi. RIH and tag fluid at 8450'WLM.Conference with engineering. By calculation there is 75'of freeze protection (diesel) in the IA. Decision made to close sleeve.Close sleeve. POH.Check BO Shifting tool. Shear pin intact.Sliding sleeve is closed. R/D Pollard. 1/14/13 Drop firing bar at 11:25 hrs. Perforation guns fired 9,195'-9,220'and 9,348'-9,400'after 2_minutes and 36 seconds drop time. Pressure on tubing before firing- 1806 psi. Pressure dropped to 1776 psi immediately after firing.Then climbed to 1856 psi after approx 5 minutes.At 11:40 hrs opened flow to Rig gas buster through manual choke. Bled down N2 from tubing with a minimal choke to 1200 psi. Monitoring returns for gas/fluid. 1/15/13 RIH with N test tool.Tag fluid at 8550'WLM at 11:35 hrs with 1550 psi on tubing. Stop&POH to 100' above fluid. Wait 30 minutes. RIH.Stop 15'above the sliding sleeve at 9055 WLM.Could not find fluid. Tubing pressure at 1650 psi at 12:05 hrs. POH with wire line N test tool.Start pumping methanol into injection mandril at 10 gals/day rate.Tool not sheared. Load lubricator with 15 gals methanol. RIH with 2"JDC to reterive N plug.Tubing pressure at 14:30hrs- 1900 psi.Work spang jars from 195'to 222'. POH.JDC packed with ice and not sheared.Change tools to a 2.15"gauge ring. RIH and work gauge ring from 222'to 260. Fell through. Hung up at 1350'. Dumped 6 gal methanol. Push plug from 1350'to 1380'.Chase plug in the hole to 4000'. Tubing pressure at 16:30-2000 psi. RIH to 5000'. No indication of plug. POH.Tubing pressure at 2025 psi at 17:00 hrs. Open well on 20/128 chk,with 2150 psi, press decreased to 2000 psi,after flowing through gas buster,4 min. Reduce chk to 16/128, press decreased • • from 2000 psi,to 1900 psi,after flowing 25 min. Increase choke to 18/128, press dec reased from 1900 psi,to 1500 psi after flowing 30 min. Increase choke to 20/128, press decreased from 1500 psi,to 1000 psi, after flowing 25 min. Reduce chk to 18/128, press decreased from 1000 psi,to 650 psi after flowing, 124 min. 1/16/13 Still attempting to bring well on. Dropped one soap stick. Begin rig up CTU. 1/17/13 Attempting to lift fluid off the well with N2. 15 bbls recovered.Shutting well in to build pressure. 1/18/13 Continue N2 lift. Recovered 15.75 bbls. Rig down SLB Coil Tubing Unit. Release Rig. 1/24/2013 Attempted fluid tag.Well on tst flowing top production. Pressure increased from 625 PSI-2058 PSI 1/25/13 RIH with 1-11/16" GRPTT.Tagged fluid at 9200'. Run GR log. POH. RU with 2.25"cutter. Radio silence. RIH.Tag up up on XN at 9120'WLM. Log up and tie in with CCL. RIH &tag up again 9120'WLM. Pull up hole 10'. Cut pipe with Spectra cutter. Pull up hole and lost CCL. RIH to 9650'. Did not encounter fish. Cut pipe in a full joint of tubing 10'above the XN nipple leaving 20'+on the new tail pipe. Bottom of tbg at 9091'. M/U PWS,2.125"Strip gun,6 SPF(total of 120 shots),0-deg phasing w/magnetic de- centralizer,w/GR/CCL. 20:30 hrs tbg press 2461 psi. RIH, RIH w/PWS,Correlation Strip Log to 9500'. Logged from 9450'-9050',tie to Schlumberger,OH Platform Express Log, 17/Nov/2001 1/26/13 Correlate the logs. Log into position, perforate 9195'to 9215'with 2.215"OD, 6 SPF(total of 120 shots). Zero degree phasing, magnetic de-centrailized gun. SITP inc from from 2426-2455 psi. POH with Pollard Wire Line. WL at 8650',open well on 32/64 choke with 2426 psi,5 min after perf.TP dec from 2426 to 1015 psi in 12 minutes,on 32/64 chk.Adj choke to 15/64,over 11 min to maintain 1000 psi. Pipeline pressure when perf at 290 psi. Flow well on 15/64 chk at 1000 psi.Turned well over to production. Ferguson, Victoria L (DOA) From: Ferguson,Victoria L(DOA) Sent: Tuesday, January 15, 2013 9:19 AM To: 'courtney.rust©cookinlet.net Cc: Schwartz, Guy L(DOA) Subject: RE: CIE RU4A Sundry 312-459(PTD 203-081) Courtney, You have approval to proceed with a nitrogen lift and/or CTU lift. No additional sundry is needed. Thanx, Victoria From: Courtney Rust fmailto:courtney.rust©cookinlet.netl Sent:Tuesday, January 15, 2013 8:33 AM To: Ferguson,Victoria L(DOA) Subject: CIE RU4A Sundry 312-459 Victoria, RU4A has not come on very well,it loaded up with water. I will give you a call this morning, but this is what we'd like to do,do we have permission to proceed on a verbal? 1. Shoot fluid level 2. Rig up N2 and pressure up tubing to balance annular pressure at sleeve+200 psi. Rig up return line from annulus. 3. Rig up and test Pollards lubricator to 3000 psi. 4. Open sliding sleeve with annulus valve closed. 5. Bleed fluid volume off annulus to match volume in tubing above sliding sleeve minus 1 bbl. or about 200'above sleeve. 6. Close Sliding sleeve. 7. Flow well to production. Courtney Rust Courtney Rust Cook Inlet Energy Project Engineer (907)433-3809 Work (907)350-0091 Mobie courtney.rust©cookinlet.net 601 W. 5th Aye,Suite 301 Anchorage,Alaska 99501 1 del) i ft � � I p ?) Ferguson, Victoria L (DOA) From: Ferguson,Victoria L(DOA) ) Sent: Tuesday, January 08, 2013 12:11 PM To: 'cperry@att.net' Cc: david.hall @cookinlet.net; courtney.rust @cookinlet.net; osprey.drilling@cookinlet.net; Schwartz, Guy L(DOA) Subject: RE: RU-4A-PTD 203-1 Sundry 312-459/50-733-20506-01 2d3 08 Conrad, You have approval to omit the second pressure test outlined in Step 10. Thanx, Victoria From: Conrad Perry jmailto:cperry @att.net] Sent: Sunday, January 06, 2013 4:36 PM To: Ferguson, Victoria L(DOA); Schwartz, Guy L(DOA) Cc: david.hall @cookinlet.net; courtney.rust @cookinlet.net; osprev.drilling @cookinlet.net Subject: RU -4A- PTD 203-018/ Sundry 312-459/ 50-733 - 20506-01 Cook Inlet Energy RE:RU-4A-PTD 203-018/Sundry 312-459/50-733-20506-01 Victoria/Guy, We would like to skip step 10 in the attached Sundry. It became redundant after your request to test the lower plug to 2500 psi was inserted. This was done this afternoon by pressure testing the entire casing to 2500 psi. We are currently laying down excess drill pipe so this request doesn't require urgent attention. Below is the excerpt from the approved sundry. Best Regards, conrad 8. Dump bail 25' of cement on top of bridge plug. Z 5-00 r‘;, ( • 9. Set second 7 518" wireline bridge plug at 10,000' 10. Test casing to 2000 psi for 30 minutes. 1 Vs THE STATE Alaska Oil and Gas °fAs Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue 01 rh g Anchora e, Alaska 99501-3572 -et LAS ' Main: 907.279.1 433 Fax: 907.276.7542 David Hall CEO Cook Inlet Energy 03- 0 t 601 W. 5th Ave., Suite 310 �, Anchorage, AK 99501 Re: Redoubt Shoal Field, Undefined Pool, Redoubt Unit #4A Sundry Number: 312-459 Dear Mr. Hall: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holid. or weekend. er: K. ■ .rma ommissioner DATED this // day of December, 2012. Encl. • • • RECEIVED STATE OF ALASKA DEC 10 012 ALASKA OIL AND GAS CONSERVATION COMMISSION /.3 /2, /// APPLICATION FOR SUNDRY APPROVALS AOG C 20 AAC 25.280 1.Type of Request: Abandon❑ Plug for Redrill❑ Perforate New Pool❑ Repair Well❑ Change Approved Program ❑ Suspend❑ Plug Perforations ISI , Perforate 0- Pull Tubing❑ Time Extension❑ Operations Shutdown❑ Re-enter Susp.Well❑ Stimulate❑ Alter Casing❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Cook Inlet Energy Exploratory ❑ Development ig. 203-081. 3.Address: Stratigraphic ❑ Service ❑ 6.API Number: 601 W 5th Ave.,Suite 310,Anchorage,AK 99501 50-733-20506-01- 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this 20 AAC 25.055 Will planned perforations require a spacing exception? yr2✓ Yes ❑ No El REDOUBT UNIT#4A- 9.Property Designation(Lease Number): i'�1# 10.Field/Pool(s): 381203 37-3114 37-'1001- REDOUBT SHOAL UNDEFINED- 11. I PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 18,091' 12,476' • 18,082' 12,467' NONE , 14,319' Casing Length Size MD TVD Burst Collapse Structural Conductor 200' 30"A-36 150# 200' 200' N/A N/A Surface 3,530' 13 3/8"L80 68# 3,530' 2,918' 5,020 PSI 2,260 PSI Intermediate 10,517' 9 5/8"L80 47# 10,517' 7,114' 6,870 PSI 4,760 PSI Production 7 5/8"L80 29.7# 14,820' 9,565' 6,890 PSI 4,790 PSI Liner 5 1/2"L80 17# 18,082' 12,467' 7,740 PSI 6,390 PSI Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 17,784'-17,855' 12,213'-12,12279' 3 1/2" NONE NONE Packers and SSSV Type: NONE Packers and SSSV MD(ft)and TVD(ft): NONE 12.Attachments: 13.Well Class after proposed work: Description Summary of Proposal � Detailed Operations Program 0 BOP Sketch El Exploratory ❑ Stratigraphic❑ Development El- Service ❑ 14.Estimated Date for 10-Dec-12 15.Well Status after proposed work: Commencing Operations: Oil ❑ Gas El • WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG El 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Courtney Rust 907-433-3809 Email courtney.rustcookinlet.net Printed Name David Hall,CEO Title /d�jv/ Signature Phone Date i cr,% /0/ COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: '3 1 Z 6r, Plug Integrity ❑ BOP Test d Mechanical Integrity Test ❑ Location Clearance ❑ Other: O P (est- .-,r Soto Ps� 'I BBIDMS DEC 13 1012 Spacing Exception Required? Yes bsequent Form Required: ,o'"7 ai 1 APPROVED BY �f Approved by: s•MMISSIONER THE COMMISSION Date: 0 "1/'/ !/ T1�./L Submit Form and 1/ 0 RI Approved application is valid for 12 months from the date of approve ,..toot tta hments in Duplicate 2\,\\v A i RECEIVED • Cook Inlet Energy DEC 10 2012 AOGCC December 4, 2012 Ms. Cathy Foerster, Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage,Alaska 99501 Re:Application for Sundry Cook Inlet Energy, LLC: Redoubt Unit#4A (PTD:203-081) Dear Ms. Foerster, f',-✓*`- Cook Inlet Energy (CIE) hereby submits a sundry application to abandon the lower__Hemlock zone of RU 4A and recomplete the well as a gas producer in the lower Tyonek Sands. RU No. 4 was originally drilled on the far eastern flank of the Redoubt Shoal structure, in the central fault block. Tests conducted on the Hemlock formation showed the reservoir to be tight and wet at this far downdip location. Tests on several Tyonek gas sands found the Lower Tyonek Gas sand to produce at commercial rates. Subsequently, the well was re-drilled up- structure and slightly south of the original wellbore in an attempt to find a better location to produce Hemlock oil. After testing the Upper Hemlock formation in RU No. 4A, the lower portion of the wellbore was lost due to collapsed casing (at 14,330' MD). The wellbore has been suspended ever since (July 2003). The collapsed casing and fish at 14,330' preclude setting a bridge plug within 50' of the top perforations. CIE requests a variance in this application to 20 AAC 25.112 (c) 1 (E) and would set the mechanical bridge plug just above the top of fish at 14,300' with 25' of cement dump bailed on top. Please find attached a competed form 10-403, outline work program, current and proposed completion diagrams. Miller Rig 35 rig layout and BOP configuration are also included. If you have any questions, please contact me at (907)-433-3804. Sincerely, /04-L David Hall CEO- Cook Inlet Energy 601 W.5th Avenue,Suite 310,Anchorage,AK 99501 (907)334-6745*(907)334-6735 fax • S Table of Contents Rig#35 Schematic 2 Current Completion 3 RU 4A Draft Gas Procedure - 11-28-12 4 Proposed Wellbore Diagram 6 BOP Sketch 7 Wellhead Schematic 8 • 0 Rig #35 Schematic 41" t "ii• it A lk rid bil, idi 16, ea kt WICKPUS ...... VD CiL WICK 21111L *4 I.D WHOM WM O K% K K 11, 1111F1 K lik 4 f viii la n It xl rr Is \ i i 1 4 21111111110 i 11 .."1 illrAller I, i t 1 ! 1 I 7 Y williprAlik 1 , I II 4 1 h wows „'. L ■ 1, 1 T 0 -MIT WA ,r `N V-IPY _- : .,-. -.: Mil , fr 51111SIBITME 1 4 . . 7.. 0 ilk I f 11 .... ...6.......::= t , .,, ,. L 41.. ono 5 it2 rri.A-:.SW W 4m . --e•-• 1 ,...- OSPREY i 1 DRILLING RIG ARRANGEMENT - EAST SIDE :::torilerlk Wee giCP16741,fit:).' MINNA. DWG ''..'72".""1"R''41: VOORHIES...mi. WHAM. _ .it•Tisom_fmt Illtrt ..... r21 001 MR OSPREY ORIatiC RIG '....I''''l'-' VAlfii Willi '''gete !i'2 .... ' * 1 • Current Completion Redoubt Unit#4A Casing Schematic-July 2003 50-733-20506-01 - Navigator 30" A-36 200 TVD 150# Welded 200 MD dh, 13 3/8" L-80 2918 ND 68 4 BTC 3530 MD TOL @ 5074 MD 9 5/8" L-80 7114 TVD 47# BTC 10517 MD -��8.8 PPG Oil based Mud P - 3 1/2"9.3#L-80 Tubing TOF 14319' GLM 14,395' _ C614-yam Tieback Stern 14,574' Back to Ton TOL 14,583' 7 5/8" L-80 9565 ND 29.7# Hydril 521 14820 MD Perforations 17,784'to 17,855' 51/2" L-80 12467 ND 17# Hydril 521 18082 MD • RU 4A Draft Gas Procedure - 11-28-12 API Well# 50-733-20506-01 1. Prior To Rig Skid check well for pressure. 2. Skid Rig to Slot#? Redoubt Unit#4. 3. Check tree for pressure. Install BPV. Nipple down Tree. 4. Nipple up and test BOPs to 3000 psi. Install 2 7/8" pipe rams in upper body. 5. Recover BPV and hanger. There is no tubing in the well. Pr- 6. Rig up single conductor and RIH with gauge ring to 14,300'. 7. Pick up and set 7 5/8" wireline bridge plug at 14,300'. , ! _ __ V- . • 8. Dump bail 25' of cement on top of bridge plug. Z SDD p5� 9. Set second 7 5/8" wireline bridge plug at 10,000' 10. Test casing to 2000 psi for 30 minutes. 11. Pick up 2 7/8" completion as follows: a. Halliburton 4 5/8" 6 SPF TCP casing guns to perforate interval 9195'—9220',9348'— 9400'. b. Drop bar firing head and release✓ C. Wireline Re-entry guide. d. 1 jt 2 7/8"tubing w RA tag e. 2 7/8"XN nipple f. 1 jt 2 7/8"tubing g. Weatherford 7 5/8"packer h. 10'2 7/8"pup jt i. Weatherford Sliding Sleeve(run open) j. 2 7/8"Tubing k. 2 7/8"Chemical Injection Mandrel(at approximately 3000')w/3/8"control line 1. 2 7/8" tubing m. Baker 2 7/8" Tubing Retrievable SSSV (at approximately 300')w/ 1/4" control line 12. RIB and space out tubing confirming gun location with GR. 13. Land hanger and run in hold down bolts. Test seals to 5000 psi. 14. Rig up and displace 8.8 ppg oil base mud with 8.5 ppg produced water through open sliding sleeve. Use appropriate spacer and corrosion package. • • 15. RU wireline and close sliding sleeve. Ensure SSSV is open. 16. Pressure up on tubing and set packer. Hold pressure and chart for 30 minutes testing tubing. 17. Test annulus to 2000 psi for 30 minutes. 18. Install BPV. 19.Nipple down BOPs. Install and test tree. 20. Release rig. Name: Lower Tyonek Sands SSTVD: 6287' —6401' Gross Interval Perforations, SSTVD: 6287' —6301', 6374' —6401' Perforations, MD: 9195' —9220', 9348' —9400' " 2.bo f p``t Tested Flow Rate: 1.0— 1.4 MMsdfpd P* 2898 psi = .466 psi/ft= 9.0 ppg EMW • • Proposed Wellbore Diagram Redoubt Unit#4A PROPOSED Casing Schematic December 2012 API 50-733-20506-01 Navigator 2 7/8"SSSV @300' 30" A-36 200 ND 150# Welded 200 MD 2 7/8"Chem Inject Valve @ 3000' i I 13 3/8" L-80 2918 ND 68# BTC 3530 MD TOL @ 5074 O 2 7/8"Sliding Sleeve @ 9130' I_i d O 7 5/8"Packer @ 9140' f A 4....4a to/tti�- 7Z..P 2 7/8"XN nipple @ 9170' ✓ — 4 5/8"TCP Guns 9195'—9220',9348'—9400'. ICtBridge Rug @ 10,000' Z O 9 5/8" L-80 7114 TV D 47# BTC 10517 MD 25'of Cerrent(durrp Bailed) Bridge Rug @ 14,300' - 31/2"9.3#L-80 Tubing TOF 14,319' GLM 14,395' Tieback Sten 14,574' Back to Top TOL 14,583' 7 5/8" L-80 9565 ND 29.7# Hydril 521 14820 MD Perforations — — 17,784'to 17,855' 5 1/2" L-80 12467 ND 17# Hydril 521 18082 MD MEM • • BOP Sketch NOTE: Upper Rams will be changed to 2 7/8" when running tubing 7132012 5-2_-t2-fi<.SOP F,c'ematic:.":,•e+ "Rig floor" Wn11:RU1 KB E18vation Date: 5/2612012 Measure distances front"Riq Floor" I IJ-11L11'1111 IlnpcIann.1.41- Hydril ,Getter Hydril --•.t 13-5/M"5k Annular 1 i 13-51890!.Hrdril —` CSOMr s"Roar. -- i 4'OP!woo �tl col 1 -- ,J ] 12 ca"1Jh.1yarl • n OI ny Rcm. [:n 1lnrR Inno i III WI'11 111 I1r 1.:ti Imo • r ' Ch.r....wl.1,4 • 1 ' 10d'r10k dude 1= 4W.4"OP toms IM•••■I, i t • \ 1 3 5.8'1 C k"..-1a'8'5K adapm-l'ponl efete,rp to Gnw Id-c"d ia56'E,1 X1 bJ"hk<ilEr n Is n l I • 'It oe o0IWL1_�1' u v...:l I • Caner l.VGk1 w 9clrvro I I • I . I :z I I • • Wellhead Schematic 1- 24.31 ■■ 41.1 .1,1106 ..... ..1/,. 3-1/8 5A1 111:4,11' 60.66' itt .4yam ,11111Fi 3-1/8 511 1 63 (ll 4--'-' ..r. N U -IW1 _1 ,„,, IRI y„,,,13-5/8 5000 68X Mill�' U1 _ AUGMENT PIN Irl SHORN 90'OUT TWO CONTROL i B I ;�, OF POSTHON I NES TOTAL - .00 : 2-1/16 5000 W/VR t W .�,;1 ;13-5/8 5000 688 III ■1 MI Y. : '_V' 2-1.16 5000 W/VR 24. 5 .1 1 I1• .VA X141 - 1=1013*- 11. ■ _ 11 a iliji : 1141 i • i 20.70- 1 :I ii 1 -. 10 0/ 30'OD CASING 3-I/2 OD AIBWIC - II INI'N 1•1�I 13-3/r OD CASING ALL DIMENSIONS ARE APPROX. 1 9-5/8'CO CASING I' 1l1D ABB VETCO GRAY SYSTEMS ENGINEERING 04111Ri 30 X 13-3/8 X 9-5/8 X 3-1/2 OD 5,000 MSP MULTIBOWL ASSY II ABB Woo Gray PRODUCER WELL IRAWN BY;C. RICE DATE 26 MAR 2001 fl EFERENCE: FOREST 06 OSPREY DRAWN NO. NG APPR: OATE: xv I ALE: NA 1PFANIECT NO.: SP-4482-2 IOW r Fisher, Samantha J (DOA) From: courtney Rust[courtney.rust @cookinlet.netj Sent: Wednesday, December 05, 2012 1:05 PM To: Fisher, Samantha J (DOA) Subject: CIE RU4A 10-403 Form/Cover Letter Attachments: RU4A Sundry APP[2].docx Here is the same version without signatures, I will run a signed copy over first thing on Monday morning. Thanks! Courtney Rust Cook Inlet Energy Project Engineer Office-907-433-3809 cell-907-350-0091 1 STATE OF ALASKA ODSKA OIL AND GAS CONSERVATION CO•SION APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1.Type of Request: Abandon u Plug for Redrill u Perforate New Pool Li Repair Well Li Change Approved Program Li Suspend u Plug Perforations u. Perforate u• Pull Tubing u Time Extension u Operations Shutdown u Re-enter Susp.Well u Stimulate u Alter Casing Li Other: RU ESP U 2.Operator Name: 4.Current Well Class: 5.Perrnit to Drill Number: Cook Inlet Energy Development u • Exploratory u 203-081• 3.Address: Stratigraphic u Service LJ 6.API Number: 601 W 5th Ave.,Suite 310,Anchorage,AK 99501 50-733-20506-01, 7.If perforating,closest approach in pool(s)opened by this operation to nearest 8.Well Name and Number: property line w here ow nership or landow nership changes: Spacing Exception Required? Yes U No u REDOUBT UNIT#4A- 9.Property Designation(Lease Number): 10.Field/Pool(s): 381203 REDOUBT SHOAL UNDEFINED 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 18,091' 12,476' . 18,082' 12,467' NONE 14,319' Casing10 /01 Length Size MD TVD Burst Collapse Structural Conductor 200' 30"A-36 150# 200' 200' N/A WA Surface 3,530' 13 3/8"L80 68# 3,530' 2,918' 5,020 PSI 2,260 PSI Intermediate 10,517' 9 5/8"L80 47# 10,517' 7,114' 6,870 PSI 4,760 PSI Production 7 5/8"L80 29.7# 14,820' 9,565' 6,890 PSI 4,790 PSI Liner 5 1/2"L80 17# 18,082' 12,467' 7,740 PSI 6,390 PSI Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): • 17,784'-17,855' 12,213'-12,12279' 3 1/2" NONE NONE Packers and SSSV Type: NONE Packers and SSSV MD(ft)and ND(ft): NONE 12.Attachments: Description Summary of Proposal u 13.Well Class after proposed work: Detailed Operations Program u BOP Sketch u Exploratory u Development u , Service Li 14.Estimated Date for 10-Dec-12 15.Well Status after proposed work: Commencing Operations: Oil Li Gas u. WDSPL Li Suspended Li 16.Verbal Approval: Date: WINJ U GINJ Li WAG LJ Abandoned Li Commission Representative: GSTOR U SPLUG u 17.I hereby certify that the foregoing is true and correct to the best of my know ledge. Contact Courtney Rust 433-3809 Printed Name David Hall,CEO Title Signature Phone Date COMMISSION USE ONLY r r ��/� Conditions of approval: Notify Commission so that a representative may witness Sundry Number: '2-11 -7 (i' J Plug Integrity Li BOP Test Li Mechanical Integrity Test Li Location Clearance Li Other: Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Page 1 of 1 • • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, November 30, 2012 9:40 AM To: 'cperry@att.net' Cc: 'courtney Rust' _ 2® _ U 2 Subject: RE: RU 4A Proposed Well Schematic.xls I Conrad, From what I can see on the schematics we can grant a variance to standard plugging regulations. 20 AAC 25.112 (C)(1)(c) allows us to grant a variance if there is a fish or fill above a the perforations and your proposal will still isolate the perforations adequately. P.S. please include the PTD for well in email subject line. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Conrad Perry [mailto:cperry@att.net] Sent: Friday, November 30, 2012 8:45 AM To: Schwartz, Guy L(DOA) Cc: 'courtney Rust' Subject: RU 4A Proposed Well Schematic.xls Guy, Need your opinion on a Osprey Cook Inlet well. Originally completed as a Hemlock producer, but collapsed the casing during the initial flow. They fished it to the collapsed 7 5/8" casing point at 14,319'. I still believe that we could mill through the collapsed casing and tubing,scab over the milled casing and then recover this well as a Hemlock producer. Unfortunately,we are in a gas crunch and there is an upper gas zone we need urgently. The attached proposed completion abandons/suspends the Hemlock with just a retainer and 25' of dump bailed cement which would be fine if it was within 500' of the perforations, but the fish precludes that. Do think this will be ok? conrad 727-7404 11/30/2012 ' Redoubt nit#4A Casing Schematic -July 20034) /4()`4' i ., .- 30" A-36 200 ND 150# Welded 200 MD II -Ali ihn_ 13 3/8" L-80 2918 TVD 68# BTC 3530 MD 11- TOL @ 5074 MD 1.�' .1, . 9 5/8" L-80 7114 ND '�" 47# BTC 10517 MD 1 3 1/2"9.3#L-80 Tubing TOF 14,319' 7 c_,* _GLM 14,395' ,-1-- coil?,a b Tieback Sterr 14,574' 'I 14 TOL 14,583' 7 5/8" L-80 9565 TVD 29.7# Hydril 521 14820 MD I Perforations 17,784'to 17,855' 5 1/2" L-80 12467 TVD 17 4 Hydril 521 18082 MD Redoub•it#4A PROPOSED Casing Schemati• • November 2012 2 7/8"SSSV @300' 1 _ J r 30" A-36 200 TVD 150# Welded 200 MD 1 2 7/8"Chem Inject Valve @ 3000' 41 dkr. 13 3/8" L-80 2918 TVD 68# BTC 3530 MD r ih TOL @5074 MD 2 7/8"Sliding Sleeve @ 9130' 7 5/8"Packer @ 9140' ,R T W 2 7/8"XN nipple @ 9170' S 5'A IJ 4 5/8"TCP Guns 9195'—9220',9348'—9400' q a.3 _., (J FL i FL 9 5/8" L-80 7114 TVD 47# BTC 10517 MD .�• 25'of Cement(dump Bailed) �« ..;:sK:o Bridge Plug @ 14,300' MIL �--• ` 3 1/2"9.3#L-80 Tubing TOF 14,319' GLM 14,395' III Tieback Stem 14,574' I TOL 14,583' 1 r 7 5/8" L-80 9565 TVD _11_ 1 29.7# Hydril 521 14820 MD B 4 1 Perforations 17,784'to 17,855' e 5 1/2" L-80 12467 TVD 11 i 17# Hydril 521 18082 MD • Cook Inlet Energy_ June 6, 2011 RECE 43°. Mr. Daniel Seamount, Chair JUN 1 Alaska Oil Land Gas Conservation Commission A; 3 ash 33 West 7th Suite 100 &6 A vfvw nchorage,Alaska 99501 Antiperlig ion RE: Request for Well File Document De-classification RU 4A(PTD No. 203-081) Dear Mr. Seamount, It is Cook Inlet Energy's understanding that the well file for Redoubt Unit Well 4A(PTD No. 203-081)is being held in confidential status by the Commission until authorized for release from that status by us. Please consider this letter Cook Inlet Energy's request and authorization to release this well file from its confidential status so that any interested parties may have access to the information it contains. If you have any questions or require additional information,please contact me at 433-3804. Sincerely, COOK INLET ENERGY David Hall CEO 601 West 5`"Avenue,Anchorage,Alaska 99501 Davies, Stephen F (DOA) From: David Hall [david.hall @cookinlet.net] Sent: Friday, July 15, 2011 7:37 AM To: Davies, Stephen F (DOA) Cc: 'Barbara Kruk'; Ballantine, Tab A(LAW) �'�" ['� � � 0 Subject: RE: Well File Document De-classification: RU 4A r SJ p �( Steve, Thank you for checking,yes, please proceed with the de-classification of the well file for the Redoubt Unit No.4A well. David E fr ,Cook Inlet Energy David Hall Cook Inlet Energy, CEO 601 West 5th Avenue, Suite 310 Anchorage,Alaska 99501 Main Phone: 907-334-6745 Direct phone: 907-433-3804 Fax: 907-334-6735 Cell: 907-317-8239 david.hall @cookinlet.net From: Davies, Stephen F (DOA) [mailto:steve.davies @alaska.gov] Sent: Thursday, July 14, 2011 10:12 AM To: David.Hall @cookinlet.net Cc: Barbara Kruk; Ballantine, Tab A (LAW) Subject: Well File Document De-classification: RU 4A David, Thank you for your letter dated June 6, 2011 regarding de-classification of the well file for the Redoubt Unit No.4A well. I just want to confirm with Cook Inlet Energy that by de-classifying this well file, all records associated with the Redoubt Unit No.4A well will be released to the public domain, and will be subject to public records requests from any party. Please acknowledge that this is also Cook Inlet Energy's understanding. Sincerely, Steve Davies Sr. Petroleum Geologist Alaska Oil and Gas Conservation Commission 907-793-1224 1 S ' Cook Inlet Energy_ June 6,2011 Mr.Daniel Seamount,Chair Alaska Oil and Gas Conservation Commission 333 West 7th Ave., Suite 100 Anchorage,Alaska 99501 RE: Request for Well,File Document De-classification RU 4A(PTD No.203-081) Dear Mr. Seamount, It is Cook Inlet Energy's understanding that the well file for Redoubt Unit Well 4A(PTD No. 203-081)is being held in confidential status by the Commission until authorized for release from that status by us. • Please consider this letter Cook Inlet Energy's request and authorization to release this well file from its confidential status so that any interested parties may have access to the information it contains. If you have any questions or require additional information,please contact me at 433-3804. Sincerely, .7J ' " COOK INLET ENERGY David Hall CEO 601 West 5th Avenue,Anchorage,Alaska 99501 S' ), Sy..c.bco4jkvIs\"\s10 y Lilo N E. ;1.\cs 4s\ //&- // coccei*-.Sock-s l / U ?/ AANo,Is j ----�'-'`-rte �._ 17 el—c 3-4_ tn - /4 3/, —/415-8E January 4,2006 Ss 713 :`e-'7' ' ‘LW F / Zs. ( Z); . Si L.- iin _Lc9e/ - laf U� Mr. Ted Kramer ` 0 -.//o U`� Production Manager �hd ,i 1 ZC 'e)(76) Forest Oil Corporation 50 w-ef -- n° cj4"/ 310 K Street, Suite 700 ..-/ , - 3 OW see Z_ C) -%. Anchorage,AK 99507 cL�y��/ - °� �"e j=` '�" c�,�Y /e 0 Y / ill-1 Re: Action Required on Redoubt Unit#4A, Permit#20, -081 0 0-8-4 13-C 2C---q 5' / __ Dear Mr. Kramer, - xo f7 ups Development well Redoubt Unit #4A on the 0 srey Platform mu: __-- wn since ' -gust 11, 2003. Acc -- --- well has been in operations shutdown g _ 0 i Oil Corporation ("Forest") had until A 1 11, 2004 (12 months 2g.U 7 a. unless circumstances beyond Forest's con,of prevented resumption G i vv-S` 0- 1A-‘7-‘=6 re---1-3e----i- _ Please submit a plan of operatio• • to the Commission that u conformance with the requirements •f 20 AAC 25.072. E w _ , Ge��el�/'OS Sincerely, John K.Norman Chairman cc: •ommission Well History File#203-081 I From: Saltmarsh, Arthur C (DOA) Sent: Monday, March 09, 2009 11:08 AM Subject: FW: Pacific Energy files chapter-11, it's official!!! FYI. PACIFIC ENERGY RESOURCES LTD. 111 West Ocean Blvd., Suite 1240 Long Beach, California 90802 Telephone: (562)628-1526; Fax: (562) 628-1536 Files for Chapter 11 to Facilitate a Restructuring LONG BEACH,CALIFORNIA,Monday,March 9,2009--Pacific Energy Resources Ltd.(the"Company")(TSX:PFE) announces today that it and its wholly owned subsidiaries have filed voluntary petitions for reorganization under Chapter 11 of the U.S. Bankruptcy Code in the U.S. Bankruptcy Court for the District of Delaware. The filing was precipitated by the dramatic decrease in the market price of oil over the past five months. Combined with the Company's pre-existing level of debt related to past acquisitions and poor capital market conditions,the Company's liquidity and cash flow is insufficient to operate its business and invest in its oil producing assets to increase production. Faced with these constraints,the Company and its subsidiaries filed petitions for reorganization under chapter 11 to facilitate access to an immediate source of liquidity as it works to restructure its debt. In connection with the filing,the Company is seeking customary authority from the Bankruptcy Court that will enable it to continue operating its business in the ordinary course of business. The requested approvals include requests for the authority to make wage and salary payments and continue various benefits for employees. In addition,the Company has negotiated a commitment for$40 million in debtor-in-possession("DIP")financing. The DIP facility wraps and replaces two of the Company's three asset-based credit facilities and is being provided by the lenders of the two credit facilities that are being replaced. Upon Court approval,the DIP financing combined with the Company's operating revenue will provide sufficient liquidity to fund working capital,meet ongoing obligations and ensure that normal operations continue without interruption during its restructuring. About Pacific Energy Resources Pacific Energy Resources Ltd.is an oil and gas exploration and production company based in Long Beach,California, U.S.A. Additional information relating to the Company may be found on SEDAR at www.sedar.com. The Company's web site is www.PacEnergy.com. ON BEHALF OF THE BOARD OF DIRECTORS PACIFIC ENERGY RESOURCES LTD. • Pacific Energy Resources Ltd. David Hall 4 310 K.Street,Suite 700 Alaska Operations Manager Anchorage,AK 99507 Main: 907-868-2133 Office: 907-258-8600 Cell: 907-317-8239 Fax: 907-258-8601 dmhall acener .com �P PJ' www.pacenergy.com Redoubt Unit #4A Activities Summary Based on the Alaska Oil and Gas Conservation Commission's records of operations for the Redoubt Unit#4A well,key events are(all depths presented are measured depths): 1. Permit to drill approved: May 2, 2003. 2. Spud: May 6, 2003; window in 7-5/8"drilling liner from about 15,058' to 15,078'. 3. TD: 18,091' MD reached on June 14,2003. 4. Production liner: 5-1/2" liner run to 18,082' on July 5, 2003. Top of liner at 14,583'; tieback stem at 14,574'. 5. Perforated: 17,784' to 17,855' on July 14, 2003. 6. Tubing: 3-1/2" 9.3#L-80 tubing run on July 15, 2003. 7. Well test: DST conducted July 16 to 19, 2003. Test tree rigged down on July 20,2003. 8. Attempt to pull tubing: July 20 to 23, 2003. 9. Fish tubing: July 24 to August 10, 2003. 10. Demob: August 11, 2003. Left 3-1/2" tubing and gas lift mandrel in hole. Top of fish at 14,319'. Set 3-1/8"production tree. Demob rig. 11. Application for Operations Shutdown: Sundry Application #303-224 for operations shutdown received and approved by Commission on August 11,2003. 12. Report of Operations Shutdown: Received from Forest on September 5, 2003; attachments include Report of Sundry Well Operations, RU 4A Casing Schematic diagram, and Operations Summary Report. S. Davies January 4, 2006 RU 4A-203-081 PTD issued May 2, 2003 By August 1, drilled to TD and testing begun. Appears 7-5/8" liner may have collapsed, trapping 3-1/2"tubing in hole Several emails around August 1 detailing well condition. Forest sent letter and sundry on August 11 regarding halting operations. Suspended was checked by me. Forest submitted a sundry on September 4. It lists the well as oil and OSD. Well was not successfully completed and is essentially junked due to the collapsed liner. Shutting down operations was probably a valid choice in September 2003,but with the rig having been removed from the platform there really is not opportunity for Forest to perform any work on the well. With the well in OSD, it is "somewhat"removed from our normal surveillance routines. The options for this well are to call it suspended, but it doesn't really fit the regulatory requirements. Another option is to call it a completed oil well and SI. This will have the well at least appearing on an annual report from Forest and it will allow the file to be cleared and released. r"? \OO H` c ,4-4c O-7z(et,' `71.. 3 -) t. l 7Ge 5 /4ey-'t �c_e G'C r � .� Re- Fore t Redoubt 4A(203-081) low ��..00� Subjfv1: 1Ze: ForestRedoubt4A (203-081) From: Thomas Maunder<torn maunder @admn Late , Date: Wed, 07 Jan 200414:06:05 -0900 l Penr <b ll th e~ate ' ` F maga Thanks Bill . I went back and checked our records and our log shows having received the 404 on 9/5/03 . However, I was not able to locate the copy in the well file or any record in the database. I don' t know what happened to it over here . Thanks for resending. This should close out the issue. Tom Bill Penrose wrote: Tom, I went through the records for this well at Forest Oil and found a copy of the completed Form 404 for this work along with an accompanying cover letter and wellbore schematic . It was dated September 4, 2003 . I made 2 copies and delivered them to the Commission' s offices c/o you. Apparently the original was waylaid on the originating end, the destination or somewhere in between. Be that as it may, I hope the copies that were delivered today meet the Commission' s needs . Please let me know if this issue needs further action. Regards, Bill Original Message From: Thomas Maunder [mailto:tom maunder @admin.state .ak.us] Sent : Friday, December 19, 2003 1 : 35 PM To: Bill Penrose Cc: Steve McMains Subject : Forest Redoubt 4A (203-081) Bill, I am sending this to you and trust you will get it to Roy or other appropriate person at Forest . I was looking through some of our records and noted that the appropriate form (404 I think) had not been filed as required by the sundry approval (303-224) dated August 11, 2003 . I would appreciate your early attention to this matter to submit the 1 of 2 1/8/2004 12:58 PM fl e r, % REST OIL CI. P O R A T I O N i9 0 (-21"7—y/turn/ ( 7 /e (1(0 nC r nI(((/e, /4,,/,' .(9• ('/ ".0-.1_ (.9(0 >.i S'-SO ( * /.9(i) September 4, 2003 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage,Alaska 99501 Attn: Mr. Tom Maunder Re: Redoubt Unit#4A—Operations Shutdown Mr. Maunder, DW›•-0TS' Forest Oil has ceased operations on the Redoubt Unit#4A well on the Osprey Platform. This was approved by AOGCC under approval # 303-224 dated August 11, 2003. Please find the attached 10-404 and current wellbore schematic. The well was left with a tubing hanger and a 3 1/8" production tree nippled up. There is no tubing tail or BPV installed. Forest Oil is currently evaluating how we will use this wellbore in future operations. If there are any questions, please contact me at 907-258-8600. RECEIVED JAN 0 7 2004 Alaska Oil &Gas Cons. Commission Robert D. Stinson Anchorage Drilling Engineer—Alaska Division Forest Oil Corporation Attachments: 10-404 Report of Sundry Well Operations Schematic of RU#4A Current Configuration Date Modified:9/3/03 Date Prepared:9/3/03 rds \WWCFLS1\#ANC_Driling\Redoubt Unit#4A\RU#4A Operations Shutdown 404.doc 1 of 1 Re- Fo:est Redoubt 4A (203-081) 1110 111 necessary paperwork. Please call with any questions . Tom Maunder, PE AOGCC 2 of 2 1/8/2004 12:58 PM RedouL:"`'lit#4A Update • • Subject: Redoubt Unit#4A Update OC)- - OS- ‘ Date: Fri, 1 Aug 2003 15:37:50-0600 From: Rob Stinson <RDStinson @forestoil.com> To: "Tom Maunder(E-mail)"<tom_maunder @admin.state.ak.us> CC: Paul White<PDWhite @forestoil.com> Tom, As per your request, I'll try to summarize what has taken place to date in the fishing activities on this well. The original intention of this flow test was to gas-lift the well and add perforation intervals as we go. We successfully tested the first interval in the Hemlock. The pert guns would not pass the lowermost gas lift mandrel to perforate the second interval. After several attempts to drift past the GLM were unsuccessful,we decided to pull the tubing out of the hole to fix the problem and allow access for additional perforating. The tubing string had excessive overpull and would only pick up 53'. We sat back down to within 9'of the liner top. A cut was made and the top 12,000'of the tubing string was pulled. The chemical cutter was lost in the tubing. Additional attempts to retrieve the cutter were unsuccessful and additional attempts at retrieving the tubing have been somewhat successful. We have just 9 joints of tubing,the bottom gas lift mandrel and the seal assembly left in the hole. We have never been able to move the fish since the initial sticking. Over the weekend we plan on running washpipe to get past an obstruction in the annulus. If we confirm that the 7 5/8"liner has collapsed,we will likely request that we cease operations to give us time to evaluate future uses of the wellbore. If we can wash past this obstruction,we will likely continue the fishing activities. Here is a schematic of the well's current configuration. . <<RU#4A Casing Schematic.xls>> Robert Stinson Drilling Engineer-Alaska Division Forest Oil Corporation (907)-868-2133 �'� I Name: RU#4A Casing Schematic.xls LJ RU#4A Casing Schematic.xls i Type: Microsoft Excel Worksheet(application/vnd.ms-excel)' t Encoding: base64 1 of 1 . 411STATE OF ALASKA 0 0 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations performed: Operation shutdown X Stimulate _ Plugging _ Perforate Pull Tubing_ Alter casing Repair well Other 2.Name of Operator 5.Type of well: 6.Datum elevation(DF or KB) Forest Oil Corporation Development: X 90'MSL 3.Address Exploratory: _ 7.Unit or Property nam? 310 K Street,Suite 700 Stratigraphic: _ Redoubt Unit Anchorage,Alaska 99501 _ Service: 4.Location of well at surface 8.Well number 1915'FSL,313'FEL,Sec.14,TO7N,R14W,SM Redoubt Unit#4A At top of productive interval 9.Permit number/approval number 974'FNL,848'FWL,Sec.20,TO7N,R13W,SM 303-224 *74C2J - i At effective depth 10.API number 105'FNL,670'FEL,Sec.19,TO7N,R13W,SM 50-733-20506-01 At total depth 11.Field/Pool 1010'FNL,945'FWL,Sec.20,TO7N,R13W,SM Redoubt Shoal Field 12.Present well condition summary Total depth: measured 18,091' Plugs(measured) true vertical 12,472' Effective depth: measured 14,319' Junk(measured) 14,319'to 14,574' true vertical 9,252' 3 1/2"9.3#L-80 tubing,GLM,Seal Assembly Casing Length Size Cemented Measured depth True vertical depth Structural II Conductor 200' 30" Driven 200' 200' Surface 3,530' 13 3/8" 6462 cu ft 3,530' 2,918' Intermediate 10,517' 9 5/8" 4613 cu ft 10,517' 7,114' Drilling Liner 9,746' 7 5/8" 258 cu ft 14,820' 9,565' Production Liner 3,499' 5 1/2" 1792 cu ft 18,082' 12,467' Perforation depth: measured 17,784'to 17,855'6 spf true vertical 12,182'to 12,248' Tubing(size,grade,and measured depth) 3 1/2"9.3#L-80 set @ 2,190 ft Packers and SSSV(type and measured depth) 13.Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or lniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15.Attachments 16. Status of well classsification as: Oil X Gas Suspended Service 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed*/, L�WOr- Title: Drilling Engineer,Forest Oil Corporation Date: �.7/U3 Form 10-404 rev 06/15/88 SUB IT I DUPLICATE Ai V / ';,, Redoubt 4A Casing Schematic -July 2003 0 ,, 30" A-36 200 ND 150# Welded 200 MD a, j 1 13 3/8" L-80 2918 ND ;, ; 68# BTC 3530 MD - -- TOL @5074 MD ` I I ti I i S 7 t R . _ 9 5/8" L-80 7114 ND `1 47# BTC 10517 MD . 3 1/2"9.3#L-80 Tubing TOF 14,319' ti GLM 14,395' Tieback Stem 14,574' TOL 14,583' 7 5/8" L-80 9565 ND 29.7# Hydril 521 14820 MD Perforations — 17,784'to 17,855' _ - 1 — 5 1/2" L-80 12467 ND f A 17# Hydril 521 18082 MD Re:RU#4A-404 Subject From' Tom;%uakd r<tom maunder admzu Mate ak use Date: Fri, 05 Sep 09 4 0 Q800 To: Rob Thanks Rob. We will look forward to the information. ao Tom Rob Stinson wrote: Tom, I just read through that requirement. I didn't realize that the daily reports, etc. were required with that type of 10-404. I'll get those over to you next week. Thanks, Rob Original Message From: Tom Maunder [m ailt o:to m ma u nde r @admin.state.ak.us] Sent: Friday, September 05, 2003 2:45 PM To: Rob Stinson Subject: RU#4A-404 Rob, I have received the 404 you sent for the well, but there were no attachments. The requirement at 20 AAC 25.072 (b) requires that the full set of records be submitted. Also, please note this approval is for 1 year and it can be extended for another year with a new application. I know that the rig is not over the leg where this well is located, so that greatly limits what Forest can do. We just don't want this one to "slip through the cracks" . Tom 1 of 1 8/23/2005 10:09 AM RE: RU#4A-404 03 -ca.\ Subject: RE: RU#4A-404 • Date: Fri, 5 Sep 2003 16:57:06 -0600 From: Rob Stinson <RDStinson @forestoil.com> To: 'Tom Maunder' <tom_maunder @admin.state.ak.us> Tom, I just read through that requirement. I didn't realize that the daily reports, etc.were required with that type of 10-404. I'll get those over to you next week. Thanks, Rob Original Message From: Tom Maunder[mailto:tom maunder(c�admin.state.ak.us] Sent: Friday, September 05, 2003 2:45 PM To: Rob Stinson Subject: RU#4A-404 Rob, I have received the 404 you sent for the well, but there were no attachments. The requirement at 20 AAC 25.072 (b) requires that the full set of records be submitted. Also, please note this approval is for 1 year and it can be extended for another year with a new application. I know that the rig is not over the leg where this well is located, so that greatly limits what Forest can do. We just don't want this one to"slip through the cracks". Tom 1 of 1 9/5/2003 2:55 PM • • D B E s F O R E S T O I L C O R P O R A T I O N i9 115 .3/0 C 7CCD ,eet • cite 700 C?S14-ccl owl ale, krlca 99501 0 1 \- (907) X58-8600 • (9o7) 25S-8609 (C4) September 4, 2003 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501 Attn: Mr. Tom Maunder Re: Redoubt Unit#4A—Operations Shutdown Mr. Maunder, Forest Oil has ceased operations on the Redoubt Unit#4A well on the Osprey Platform. This was approved by AOGCC under approval # 303-224 dated August 11, 2003. Please find the attached 10-404 and current wellbore schematic. The well was left with a tubing hanger and a 3 1/8" production tree nippled up. There is no tubing tail or BPV installed. Forest Oil is currently evaluating how we will use this wellbore in future operations. If there are any questions, please contact me at 907-258-8600. 40 Robert D. Stinson Drilling Engineer—Alaska Division Forest Oil Corporation Attachments: 10-404 Report of Sundry Well Operations Schematic of RU #4A Current Configuration Date Modified:9/3/03 Date Prepared:9/3/03 rds \\ANCFLS11#ANC_Drilling\Redoubt Unit#4A\RU#4A Operations Shutdown 404.doc 1 of 1 ' 0 • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations performed: Operation shutdown X Stimulate _ Plugging _ Perforate Pull Tubing_ Alter casing Repair well Other 2.Name of Operator 5.Type of well: 6.Datum elevation(DF or KB) Forest Oil Corporation Development: X 90'MSL 3.Address Exploratory: _ 7.Unit or Property name 310 K Street,Suite 700 Stratigraphic: _ Redoubt Unit Anchorage,Alaska 99501 Service: 4.Location of well at surface 8.Well number 1915'FSL,313'FEL,Sec. 14,TO7N,R14W,SM Redoubt Unit#4A At top of productive interval 9.Permit number/approval number 974'FNL,848'FWL,Sec.20,TO7N,R13W,SM 303-224 At effective depth 10.API number 105'FNL,670'FEL,Sec. 19,TO7N, R13W,SM 50-733-20506-01 At total depth 11.Field/Pool 1010'FNL,945'FWL,Sec.20,TO7N,R13W,SM Redoubt Shoal Field 12. Present well condition summary Total depth: measured 18,091' Plugs(measured) true vertical 12,472' Effective depth: measured 14,319' Junk(measured) 14,319'to 14,574' true vertical 9,252' 3 1/2"9.3#L-80 tubing,GLM,Seal Assembly Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 200' 30" Driven 200' 200' Surface 3,530' 13 3/8" 6462 cu ft 3,530' 2,918' Intermediate 10,517' 9 5/8" 4613 cu ft 10,517' 7,114' Drilling Liner 9,746' 7 5/8" 258 cu ft 14,820' 9,565' Production Liner 3,499' 5 1/2" 1792 cu ft 18,082' 12,467' Perforation depth: measured 17,784'to 17,855'6 spf true vertical 12,182'to 12,248' Tubing(size,grade,and measured depth) 3 1/2"9.3#L-80 set @ 2,190 ft RECEIVED D Packers and SSSV(type and measured depth) rr 1 53 13.Stimulation or cement squeeze summary Alaska } �1 8s � t✓�T" Intervals treated(measured) fn'S310f' Treatment description including volumes used and final pressure Anchorage 14. Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15.Attachments 16. Status of well classsification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. i Signed' lip v ......---z Title: Drilling Engineer, Forest Oil Corporation Date: g/y d� Form 10-404 rev 06/15/88 SUBMIT I DUPLICATE J Redoubt U•4A Casing Schematic -July 2003 • Al —._,,.. ... . L . 7. 30" A-36 200 ND 150# Welded 200 MD 13 3/8" L-80 2918 TVD 68# BTC 3530 MD TOL @5074 MD al . a., 9 5/8" L-80 7114 TVD S 47# BTC 10517 MD 3 1/2"9.3#L-80 Tubing TOF 14,319' GLM 14,395' Tieback Stem 14,574' 1 ti!!. TOL 14,583' 7 5/8" L-80 9565 TVD .J 1. 29.7# Hydril 521 14820 MD Perforations —_ 17,784'to 17,855' >E ,7-I 5 1/2" L-80 12467 TVD * 17# Hydril 521 18082 MD f ' 1 Today's Date: 09/05/2003 r "' OPERATIONS SUMMARY REPORT 10 WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: ``- WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/01/2003 DSS: 0 DEPTH: 20,056 MUD WT: 8.70 CUM COST TO DATE: 55,322.00 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 C BP NU BOPE 3.00 C PT TEST BOP 250/3000. 0.50 C RS Normal Rig service 2.00 C PT TEST BOP 250/3000 PSI. 4.00 C TB PULL TUBING HANGER.L/D 70 JTS 3 1/2 L-80 TUBING. 12.00 C TR SET WEAR RING.P/U,STRAP, DRIFT 65 JTS 2 7/8.P/U 161 JTS HT 38.P/U HT 40 DATE: 05/02/2003 DSS: DEPTH: 20,056 MUD WT: 8.70 CUM COST TO DATE: 120,497.10 HOURS PH OP ACT ACTIVITY DESCRIPTION 7.50 IS-D TR P/U drill string.Tag bottom at 20047'. 1.50 IS-D CM Plug back with a balanced plug. 1.00 IS-D TR Pull out of plug to 18565'. 3.00 IS-D CC Reverse circulate.Trace of cement in returns. 1.00 IS-D RS Cut drilling line. 10.00 IS-D TR POH. Lay down 2 7/8"tools. DATE: 05/03/2003 DSS: DEPTH: 20,056 MUD WT: 8.70 CUM COST TO DATE: 181,511.10 HOURS PH OP ACT ACTIVITY DESCRIPTION 7.00 IS-D TR RIH with 7 5/8"scraper to 15200'. 1.50 IS-D CC Circulate bottoms up.Max gas 590 units. 6.00 IS-D TR POH. Lay down scraper. 7.00 IS-D TR RIH with 7 5/8"Bridge plug. 0.50 IS-D TR Set bridge plug at 15080'. 1.00 IS-D RS Cut drilling line. 1.00 IS-D CC Rig to displace with oil base mud. DATE: 05/04/2003 DSS: DEPTH: 15,080 MUD WT: 9.70 CUM COST TO DATE: 263,111.24 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-C CC Rig to displace. 8.00 IS-C CC Pump sweeps and displace with 9.8#oil base mud. 4.00 IS-C TR POH. 1.50 IS-C RS Repair rig iron roughneck. 1.50 1S-C TR POH.Lost 8 bow springs from cement stinger. 8.00 IS-C TR Pick up HWDP,drill collars and BHA. Lay down 5100'of 3.5"HT-38 drill pipe. DATE: 05/05/2003 DSS: DEPTH: 15,080 MUD WT: 9.70 CUM COST TO DATE: 325,645.24 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.50 IS-D TR Finish laying down 3.5"HT-38 drill pipe. 8.50 IS-D TR P/U 6 3/4"mill and 4500'of 4"HT-40 drill pipe. RIH. 1.50 IS-D TR Tag retainer at 15080'. No problems with junk.Pump dry job. 5.50 IS-D TR POH. 7.00 D TR P/U whipstock.Orient to tool face.Pulse check MWD.RIH. DATE: 05/06/2003 DSS: DEPTH: 15,058 MUD WT: 9.75 CUM COST TO DATE: 416,400.24 Page No: 1 CoDvriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 h r w C' OPERATIONS SUMMARY REPORT • 1 � WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ HOURS PH OP ACT ACTIVITY DESCRIPTION 7.00 D TR RIH with whipstock. 1.50 D DS Set whipstock at 47 degrees right.Top of wedge is at 15058'. 8.50 D DS Mill out from 15058'to 15078'.Wash to 15102'. 2.50 D CC Circulate and rotate above window working free of torque,drag and swabbing. 4.50 D TR POH with window mills. DATE: 05/07/2003 DSS: DEPTH: 15,058 MUD WT: 9.75 CUM COST TO DATE: 574,434.46 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 D TR Lay down whipstock mills. 2.00 D TR Pick up kick off assembly. RIH to 1800'. 1.50 D RS Lubricate rig.Cut drilling line. 4.00 D TR RIH to window. 1.00 D DS Orient tool face and position bit at bottom of window. 2.50 D DR Time drill from 15072'. 1.50 D RS Repair rig.Replace mud line shock hose. 9.00 D DR Time drilling,attemt kick off. DATE: 05/08/2003 DSS: DEPTH: 15,058 MUD WT: 9.90 CUM COST TO DATE: 635,906.52 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 D TR Time drilling to 15085'.Could not kick off. 7.50 D TR POH with drilling assembly. 6.00 D PT Test BOP. 6.00 D TR RIH with 300'of 3.5"cement stinger. 2.00 D TR Wash and work through window to 15168'.Clean debis from area. DATE: 05/09/2003 DSS: DEPTH: 15,058 MUD WT: 9.80 CUM COST TO DATE: 703,265.52 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 D CC PULL UP INTO 7 5/8 LINER.ESTABLISH RT.CBU W/RT&RECIP. 4.50 D CC WASH THROUGH WHIPSTOCK.WASH T/15,162.CBU. REV CIRC @ 15,050 1.00 D CC TIH T/15,160.CIRC.TRANSFER MAPCO SPACER T/PILL PIT. 1.50 D CM R/U T/CMT.PUMP 10 BBL MAPCO,4 BBL H2O.TEST LINES T/3,500.PUMP 5 BBL H20. PUMP 50 BBL 17#CMT. PUMP 5 BBL H2O.PUMP 3 BBL MAPCO.DISP W/160 BBL OBM @ 5 BPM WHILE HOLDING 800#BP ON CHOKE. 0.50 D CM PULL 3 STDS SLOW.T/14880. 1.00 D CC REV CIRC @ 5 BPM.@ BTM UP DUMP 65 BBL CONT.OBM&20 BBL 17#CMT. 2.00 D TR TOH.T/13,950.PUMP DP WIPER DART.CIRC 2 DP VOLUMES @ 6.5 BPM.*SWAP RIG OVER TO CAT POWER. 6.00 D TR TOH.L/D 10 JTS 3 1/2 DP. 2.00 D TR MK UP BHA.SURFACE TEST MWD. 2.50 D TR TIH W/KICK OFF ASSY. DATE: 05/10/2003 DSS: DEPTH: 15,085 MUD WT: 9.90 CUM COST TO DATE: 800,094.35 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 D TR RIH. Fill pipe @ 6,000'&12,300'. RIH t/13,900' 1.00 D RS Service crown,drawworks&topdrive. Change saver sub. 1.00 D TR PJSM. Cut and slip drilling line. Page No: 2 Coavriaht©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 OPERATIONS SUMMARY REPORT • WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/10/2003 DSS: DEPTH: 15,085 MUD WT: 9.90 CUM COST TO DATE: 800,094.35 0.50 D TR RIH t/14,574'. Establish circulation 0.50 D DR Wash V 14,890'.Tag cement. 4.00 D DC Drill cement f/14,890't/15,050. 3.50 D DR Circ hole. Orient 50-60 R. Slide f/15,050 V 15,067. 6.50 D DR Slide. Time drilling f/15,067't/15,085 5.00 D DR Experiencing pack-off problems. Work tight hole. Pipe free @ 0600. Stand back one stand and prepare to pump sweep DATE: 05/11/2003 DSS: DEPTH: 15,112 MUD WT: 9.80 CUM COST TO DATE: 875,773.49 HOURS PH OP ACT ACTIVITY DESCRIPTION 6.00 D CC ESTABLISH RT&FULL CIRC.PUMP HIGH VIS SWEEP. RT&RECIP ABOVE WHIPSTOCK F/15,044 T/14,952 1.50 D DR ORIENT @ 50 R&ATTEMPT T/WORK BHA INTO WINDOW.AFTER MULTIPLE ATTEMPTS,ENTER WINDOW @ 30 R. 4.75 D DR TIME DRILL F/15,085 T/15,097 @ 2 MIN PER INCH, N/G. 3.00 D DR TROUGH @ 15,097. 8.75 D DR TIME DRILL T/15,112.3 MIN PER INCH.90%CEMENT,5%COAL,5%SAND RETURNS. DATE: 05/12/2003 DSS: DEPTH: 15,112 MUD WT: 9.80 CUM COST TO DATE: 945,660.97 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 D DR TIME DRILL T/ 15,112. 2.00 D CC TOH ABOVE WHIPSTOCK T/14,944. PUMP HIGH VIS SWEEP&CIRC OUT. 10%INC.IN CUTTINGS. 7.00 D TR TOH. 1.50 D TR C/O MUD MTR,MWD PROBE&BIT. 0.50 D RS SERVICE RIG. 5.50 D TR TIH.SHALLOW TEST MWD. 5.50 D DR ESTABLISH CIRC.ORIENT TOOL FACE T/60 R.ATTEMPT T/ENTER WHIPSTOCK. N/G.USE BAKER PROCEDURES,ATTEMPTING T/ENTER WHIPSTOCK. N/G DATE: 05/13/2003 DSS: DEPTH: 15,058 MUD WT: 9.80 CUM COST TO DATE: 1,036,468.78 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 D TR ATTEMPT T/ENTER WHIPSTOCK,USING BAKER PROCEDURES.N/G. 7.50 D TR PUMP DRY JOB.TOH. 0.50 D RS SERVICE RIG 5.00 D TR P/U MULE SHOE&10 JTS 3 1/2 DP.TIH. 1.00 D RS (TURBINE FLAME OUT)CUT&SLIP DRLG LINE. 3.50 D TR WASH THRU WINDOW(SLICK)CIRCULATE&CONDITION MUD. 1.50 D CM PJSM.PUMP 9 BBL MAPCO.PUMP 4 BBL H20.TEST LINES T/3,500 PSI.PUMP 5 BBL H20.PUMP 70 SKS, 12.3 BBL 17#CMT @ 0100. HOLD 1,000 PSI ON ANNULUS.PUMP 3 BBL H2O&3 BBL MAPCO. DISPLACE W/161 BBLS OBM.CMT IN PLACE @ 0200. 0.50 D TR TOH T/14,722. 1.50 D CC REVERSE CIRC @ 6 BPM.CIRC DP VOL,LONG WAY. 1.50 D CM HOLD 2000 PSI ON ANNULUS.CMT BATCHED @ 0100. 0.50 D TR PUMP DRY JOB.TOH DATE: 05/14/2003 DSS: DEPTH: 15,058 MUD WT: 10.00 CUM COST TO DATE: 1,139,908.75 HOURS PH OP ACT ACTIVITY DESCRIPTION Page No: 3 Copyright©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 r '"� "AERATIONS SUMMARY REPORT PERK WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/14/2003 DSS: DEPTH: 15,058 MUD WT: 10.00 CUM COST TO DATE: 1,139,908.75 7.50 D TR TOH W/MULE SHOE.UD 10 JTS 3 1/2 DP. 1.00 D RS CLEAN RIG FLOOR&SERVICE RIG. 1.50 D TR P/U BAKER MILLING BHA. 5.75 D TR TIH.WASH F/14,723.CMT STRINGER @ 14,950.POLISH TOP OF SLIDE T/15,071. 1.75 D CC CIRCULATE BTMS UP.APPROXIMATLY 1 BBL CMT RETURNS. 0.50 D WR WORK MILLS THRU WINDOW. NO CEMENT. 2.50 D CC PUMP DRY JOB.TOH. 0.50 D RS REPAIR IRON ROUGHNECK. 3.00 D TR TOH W/MILLING ASSY. DATE: 05/15/2003 DSS: DEPTH: 15,058 MUD WT: 10.00 CUM COST TO DATE: 1,202,262.16 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 D TR Stand back BHA. Lay down mills. 5.00 D PT Pull wear bushing.Test BOP.3000/250 0.50 D TR PJSM. Pick up 10 joints of 3-1/2"drillpipe. 5.50 D TR TIH 1.00 D TR Cut and slip 175'of drilling line. 0.50 D RS Lubricate rig. 0.50 D TR Wash to bottom. Tag @ 15,085'. 2.00 D CC Condition mud and circulate. 0.50 D CC Reverse circulate 3000 strokes. 1.50 D CM PJSM. Install head pin. Pres annulus to 2,000 psi f/10 minutes,76 psi loss.2 strokes to pressure back up to 2,000 psi. 2.50 D CM PJSM. Pump 9 bbls.Mapco. Turn over to BJ. Pump 4 bbls.water. Test cement lines U 3,500 psi. Pump 5 barrels water; 17.67 barrels of 17#Class G cement.Pump 3 barrels of water. Pump 3 barrels of Mapco.Displace w/ 160 barrels OBM. Cement in place @ 0110 hrs. P.O.O.H.U 14,798'and reverse circulate. 1.50 D TR TOH U 14,450'. Circ long way. Circulate bottoms up. Mix and pump dry job. 2.00 D TR TOH w/mule shoe. DATE: 05/16/2003 DSS: DEPTH: 15,058 MUD WT: 9.90 CUM COST TO DATE: 1,269,286.84 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.50 D TR POH-LAY DN 10 JTS 3 1/2 DRILL PIPE&MULE SHOE 0.50 D RS Normal rig service 0.50 D TR M/U BAKER DRESSING ASS'Y(STARTER MILL-6 1/16",WATERMELLON MILL-6 3/16"&SIZING MILL-6 3/4") 4.50 D TR RIH 6.00 IS-D DC TAG CMT AT 14805'-DRLG CMT W/10K WT AT 20 FPH FOR FIRST 50 FT-30 TO 40 FPH TO 15000' -40 TO 80 FPH TO 15040 3.50 IS-D DC CIR&COND MUD(WOC) 0.50 IS-D DC DRILL CMT TO 15047(SOFT) 5.00 IS-D DC CIR&WOC DATE: 05/17/2003 DSS: DEPTH: 15,058 MUD WT: 9.95 CUM COST TO DATE: 1,362,642.70 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 C DC DRLG CMT F/15047 TO 15082(TOOK NO WT TO DRLG) 1.50 C TR CIR BTMS UP&PUMP DRY JOB 7.00 C TR POH-LAY DN 7 DC'S BUMPER SUB.JARS&HWDP 1.00 C TR Page No: 4 Coovriaht©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 PE RC OPERATIONS SUMMARY REPORT • WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/17/2003 DSS: DEPTH: 15,058 MUD WT: 9.95 CUM COST TO DATE: 1,362,642.70 P/U SIDETRACK BHA-ORIENT MTR 5.00 C TR RIH TO 15045 1.50 C RS SERVICE RIG-CUT DRLG LINE-WHILE CIR HOLE 0.50 C DS ORIENT BIT TO 60R-SLACK OFF TO 15072-CIR 80 BBL-PUMP PACKED OFF(UNABLE TO MOVE PIPE) 4.50 C DS WORKING STUCK PIPE BIT AT 15074'(UNABLE TO ROTATE OR CIR) DATE: 05/18/2003 DSS: DEPTH: 15,058 MUD WT: 9.90 CUM COST TO DATE: 1,427,720.42 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-D FS WORK STUCK PIPE(UNABLE TO CIR) 10.00 IS-D FS ESTABLISH CIR-WORK PIPE-PUMP 40 BBL SWEEP-WORK TORQ DN HOLE-UNABLE TO FREE PIPE 8.50 IS-C SL R/U APRS-RIH W/STRING SHOT(PUMP TOOLS DN W/RIG PUMP) ATTEMPT BACK OFF AT 14984'(ONE DC ABOVE MWD) 2.00 IS-D SL POH W/SLICK LINE 2.50 IS-D TR POH W/FREE PIPE DATE: 05/19/2003 DSS: DEPTH: 15,058 MUD WT: 9.90 CUM COST TO DATE: 1,500,963.02 HOURS PH OP ACT ACTIVITY DESCRIPTION 6.50 IS-D TR POH-UD 12 JTS 3 1/2 HWDP,3 MONEL DC'S 0.50 IS-C RS NORMAL RIG SERVICE 1.50 IS-C Fl M/U SCREW IN SUB-BUMPER SUB-BOWEN JARS-12 DC'S&ACC JARS 4.00 IS-C TR RIH TO 13900 1.00 IS-C RS SLIP&CUT DRLG LINE 1.00 IS-C TR RIH TO JUST ABOVE FISH AT 14984 6.00 IS-C Fl SCREW INTO FISH AT 14984-WORK&JAR IN ATTEMPT TO FREE FISH(UNABLE TO CIR THRU FISH)MADE NO PROGRESS 3.50 IS-C SL RIG UP APRS-M/U STRING SHOT-RIH TO ATTEMPT BACK OFF AT 15015(TOP OF MWD) DATE: 05/20/2003 DSS: DEPTH: 15,058 MUD WT: 10.10 CUM COST TO DATE: 1,585,455.32 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 IS-C Fl RIH W/APRS STRING SHOT-UNABLE TO GET PAST TOP OF FISH W/STRING SHOT 1.00 IS-C Fl WORK DN 10 TURNS TO LEFT-FIRE STRING SHOT AT 14984-PICK UP CONFIRM BACK OFF 3.00 IS-C Fl POH W/WIRE LINE&RIG DN APRS 0.50 C RS Normal Rig service 7.50 IS-C TR PUMP DRY JOB-POH-LID BHA(BACKED OFF AT TOP OF SCREW-IN SUB LEAVING SCREW-IN SUB IN HOLE- TOP OF FISH 14981.48) 7.50 IS-C TR M/U SECTION MILL&BHA-RIH TO 14820'(SLM NO CORRECTION) 1.50 CT DS MILL SECTION-APPEAR TO HAVE KNIVES THROUGH CASING AT 14820' DATE: 05/21/2003 DSS: DEPTH: 14,857 MUD WT: 10.10 CUM COST TO DATE: 1,681,108.24 HOURS PH OP ACT ACTIVITY DESCRIPTION Page No: 5 Copyright©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 E 411ERATIONS SU M RY MA REPORT PER C WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/21/2003 DSS: DEPTH: 14,857 MUD WT: 10.10 CUM COST TO DATE: 1,681,108.24 3.00 IS-C DS MILL SECTION F/14821 TO 14832-PUMP SWEEP W/NO INCREASE IN CUTTINGS TO SURFACE 7.00 IS-C DS MILL SECTION F/14832 TO 14842-PUMP 3 HI VIS SWEEPS(HI PUMP PRESSURE HI TORQ 5.00 IS-C CC CIR&WORK TIGHT HOLE&PACK OFF 5.50 IS-C DS MILL F/14842 TO 14852-CIR SWEEPS-HI TORQ&PUMP PRESSURE 3.50 IS-C DS MILL F/14852 TO 14857-PUMPING SWEEPS DATE: 05/22/2003 DSS: DEPTH: 14,878 MUD WT: 10.15 CUM COST TO DATE: 1,757,471.12 HOURS PH OP ACT ACTIVITY DESCRIPTION 9.50 IS-C DS MILL SECTION F/14857 TO 14878-CONTINUE PUMPING HI-VIS SWEEPS 7.00 IS-C CC CIR HI-VIS SWEEPS UNTIL HOLE CLEAN 5.50 IS-C TR PUMP DRY JOB-POH 2.00 IS-C TR LAY DN SECTION MILL&4 3/4"DC'S DATE: 05/23/2003 DSS: DEPTH: 14,878 MUD WT: 10.30 CUM COST TO DATE: 1,846,715.12 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 IS-D RS SERVICE RIG. 2.50 IS-D TR P/U MULE SHOE&10 JTS 3 1/2 DP.TIH T/7 5/8 LT. 0.50 IS-D CC CIRC @ 7 5/8 LINER TOP. 3.25 IS-D TR TIH T/14,815. 1.00 IS-D RS SLIP/CUT DRLG LINE. 0.75 IS-D WR WASH IN.TAG TOF©14,984.P/U T/14,974 1.50 IS-D CC CBU 1.00 IS-D PT PRES TEST FORMATION T/1,500 PSI. 140 PSI LOSS IN 10 MIN. 1/2 BBL T/PRES BK UP. 1.75 IS-D CM PUMP 10 BBL MAPCO SPACER,4 BBL H2O.TEST LINES T/3500 PSI.PUMP 47 BBL 17#SLURRY W/HEMATITE. PUMP 3 BBL H2O&3 BBL MAPCO.DISPLACE W/ 153 BBL OBM. 0.50 IS-D TR TOH T/14,520.(300'ABOVE TOP OF WINDOW) 3.00 IS-D CC REV CIRC 1.75 IS-D TR TOH T/14,073.CIRC DP VOL.PUMP DRY JOB. 0.50 IS-D RR TURBINE FLAME OUT ON SHORE. 5.50 IS-D TR TOH.L/D 10 JTS 3 1/2 DP. DATE: 05/24/2003 DSS: DEPTH: 14,878 MUD WT: 9.90 CUM COST TO DATE: 1,921,165.16 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.50 IS-D PT TEST BOPE 250/3,000 PSI. 3.50 IS-D TR M/U BHA. 1.50 DEG BEND.P/U 18 JTS HWDP DRIFT&HAMMER.(HEAVY SCALE BUILD UP)SHALLOW TEST MWD. 4.50 IS-D TR DRIFT 1ST 10 STDS HT 40 FOR POSSIBLE CMT)FILL DP&CHECK PULSE @ 5,000,8350&13,600. 1.00 IS-D CC CIRCULATE&SHEAR MUD @ 220 GPM.CHECK PULSE. 0.50 IS-D TR TIH.TAG CMT STRINGER @ 14,175.P/U BRK CIRC&EST.RT.DRILL CMT T/14,178.2-3 K BIT WT.PACKING OFF OVER 30 SPM.PARTIAL PLUGGING OFF OF JETS. 5.00 IS-D CC P/U T/14,072.SHEAR/CONDITION MUD.LOWER MW F/10.3+T/10.0 PPG.VIS DN T/160. PACKING OFF OVER 30 SPM,PARTIAL PLUGGING OF JETS. 5.00 IS-D TR TOH/WET F/ PARTIALLY PLUGGED JETS/MWD. DATE: 05/25/2003 DSS: DEPTH: 14,878 MUD WT: 10.00 CUM COST TO DATE: 1,983,751.16 Page No: 6 Copyright©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 PERK"' •ERATIONS SUMMARY REPORT I WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/25/2003 DSS: DEPTH: 14,878 MUD WT: 10.00 CUM COST TO DATE: 1,983,751.16 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 IS-D TR TOH(WET)FOR PLUGGED JETS/MWD. 4.00 IS-D TR CLEAN OUT CEMENT F/MWD.STD BK BHA.TIH 27 STDS 4"HT DP HAMMER TOOL JTS.ON HT 40 0.50 IS-D RS SERVICE RIG. 1.50 IS-D TR TIH.38 STDS TOTAL HT 40,HAMMER TOOL JTS.RECOVER 4 GAL CMT F/TOOL JTS. 5.50 IS-D TR BRK CIRC. INTERNAL PK OFF.TOH(WET)CULLING HT DP. 3.50 IS-D TR TIH 20 STDS W/3 1/2 XO TRAP. HAMMER TOOL JTS.BRK CIRC. FULL CIRCULATION.TOH. 2.00 IS-D TR P/U KICK OFF BHA W/1.50 BEND.SHALLOW TEST MWD. 3.00 IS-D TR P/U HT 40.TIH 0.50 IS-D CC CIRC 2 DP VOL.TEST MWD @ 4460'. 1.50 IS-D TR TIH W/KICK OFF BHA.TEST MWD @ 8630.GOOD PULSE. DATE: 05/26/2003 DSS: DEPTH: 14,840 MUD WT: 9.80 CUM COST TO DATE: 2,052,357.42 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-D CC CIRC 2 DP VOLUMES.PIPE CLEAR. 2.00 IS-D TR TIH&RATTLE DP T/13,500'. 0.50 IS-D CC CIRC/SHEAR DP VOL. 2.50 IS-D WR WASH&ROTATE F/14,165 T/14,634.SMALL STRINGER @ 14,200&14,438. 1.50 IS-D DC TAG CEMENT @ 14,595.RT DRILL T/14,730.(WOB 8-10 K) 2.50 IS-D CC PUMP HIGH VIS SWEEP.RT&RECIP.GOOD AMOUNT OF CMT RETURNS. 1.00 IS-D DC SLIDE 14,730-14,820.(TOP OF WINDOW) 13.00 D DC ORIENT 160-180R.TIME DRILL F/14,820 T/14,840.5%FORATION IN SAMPLES. DATE: 05/27/2003 DSS: DEPTH: 14,850 MUD WT: 10.10 CUM COST TO DATE: 2,119,609.36 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-D DC TIME DRILLING 2 MPI TI 14,844. 3.00 IS-D CC CIRCULATE HIGH VIS SWEEP.5%SAND IN SAMPLES. 5.50 IS-D TR PUMP DRY JOB.TOH. 2.50 IS-D TR P/U 5"MOTOR,SET @ 2 DEG.M/U BIT,ORIENT MWD.SHALLOW TEST.CLEAN RIG FLOOR. 5.50 IS-D TR TIH T/14,800'.BRK CIRC&ORIENT T/175R SLIDE OUT WINDOW T/14,825. 0.50 IS-D TR Tripping-BHA work 1.50 IS-D RS CUT DRLG LINE,SERVICE RIG&C/O SAVER SUB. 1.50 D DR TROUGH F/14,825 T/14,844. 3.00 D DR TIME DRILL F/14,844 T/14,850. DATE: 05/28/2003 DSS: DEPTH: 14,885 MUD WT: 9.90 CUM COST TO DATE: 2,188,712.80 HOURS PH OP ACT ACTIVITY DESCRIPTION 7.00 D DR TIME DRILL T/14,885.35%SAND IN SAMPLES.PUMP SWEEP @ 14,876. 1.50 D CC CIRCULATE OUT SWEEP WHILE RECIP.50%SAND IN SAMPLES. 3.00 D TR TOH.TIGHT&PACKING OFF @ 14,770.WORK PIPE,EST CIRC. 1.00 D TR PUMP OUT T/13,508.ATTEMPT T/PK OFF. 1.50 D CC CBU©315 GPM&RECIP 13,508-13,412. 5.00 D TR PULL 10 STDS SLICK.PUMP DRY JOB.TOH. 2.00 D TR M/U BHA. 1.5 DEG BEND ON MTR.SHALLOW TEST. 3.00 D TR TIH.FILL PIPE @ 5,000&9,000'. Page No: 7 Copyright©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 PERK" •ERATIONS SUMMARY REPORT r WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 05/29/2003 DSS: DEPTH: 14,999 MUD WT: 10.00 CUM COST TO DATE: 2,303,495.50 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 D TR TIH W/DRLG ASSY,1.5 DEG BEND. 2.00 D CC CIRCULATE&SHEAR MUD.@ 14,800. 2.00 D WR WASH T/BTM.CLN OUT F/14,820 T/BTM ORIENT 140R WORK T/14,885 8.00 D DR SLIDE F/14,885-14,930.WORK SLIDE.TIGHT&PACKING OFF.REAM Fl 14,893-14,923. 2.00 D DR DRILURT F/14,923-14,952. 8.00 D DR SLIDE F/14,952 T/14,999 DATE: 05/30/2003 DSS: DEPTH: 15,224 MUD WT: 9,841.00 CUM COST TO DATE: 2,666,645.46 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 D CC Circulate,rotate and reciprocate for hole cleaning at 14999'. 17.50 D DR Drill form 14999'to 15182'. 1.00 D CC Circulate,rotate and reciprocate for hole cleaning at 15182'. 4.50 D DR Drill to 15224' DATE: 05/31/2003 DSS: DEPTH: 15,435 MUD WT: 9.80 CUM COST TO DATE: 2,737,242.71 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.50 D DR Drill form 15224'to 15293'. 3.00 D CC Circulate and short trip.Hole in good shape. 1.50 D DR Drill from 15293'to 15319'. 1.00 D TR Jar pipe free at 15319'. 14.00 D DR Drill to 15435'. DATE: 06/01/2003 DSS: DEPTH: 15,732 MUD WT: 9.80 CUM COST TO DATE: 2,805,781.57 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.00 D DR Drill from 15435'to 15482'. 1.50 D CC Circulate,rotate and reciprocate for hole cleaning. 18.50 D DR Drill from 15482'to 15732'. DATE: 06/02/2003 DSS: DEPTH: 15,745 MUD WT: 9.80 CUM COST TO DATE: 2,908,778.63 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 D DR Drill from 15732'to 15745'. 3.00 D CC Circulate the hole clean. 7.50 D TR POH with bit#8. 5.50 D PT Test BOP.AOGCC waived witness. 5.00 D TR RIH with bit#9. DATE: 06/03/2003 DSS: DEPTH: 15,971 MUD WT: 9.80 CUM COST TO DATE: 2,976,286.31 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 D TR RIH with bit#9. 0.50 D CC Wash 90'to bottom.5'fill. 21.00 D DR Drill from 15745'to 15971'. DATE: 06/04/2003 DSS: DEPTH: 16,330 MUD WT: 9.80 CUM COST TO DATE: 3,054,545.73 Page No: 8 Coovriaht©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 hh r C OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 06/04/2003 DSS: DEPTH: 16,330 MUD WT: 9.80 CUM COST TO DATE: 3,054,545.73 HOURS PH OP ACT ACTIVITY DESCRIPTION 24.00 D DR Drill from 15,971'to 16,330'. DATE: 06/05/2003 DSS: DEPTH: 16,584 MUD WT: 9.80 CUM COST TO DATE: 3,125,898.87 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 D DR Drill from16330'to 16341'. 3.50 D CC Circulate the hole clean. 1.50 D TR Short trip into the window. No hole problems. 0.50 D RS Normal rig service 1.00 D RS Cut drilling line. 0.50 D TR RIH.No hole problems. 16.50 D DR Drill from 16341'to 16584'. DATE: 06/06/2003 DSS: DEPTH: 16,713 MUD WT: 9.80 CUM COST TO DATE: 3,192,581.61 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 D DR DRILL T/16,605. 2.00 D CC PUMP HIGH VIS SWEEP.CBU W/RT&RECIP. 4.50 D DR DRILL T/16,666. 0.50 IS-D RR KUSTATAN TURBINE DOWN. 6.00 IS-D DR DRILL T/16,713.HIGH VIS SWEEP IN @ 16,700. 1.00 IS-D DR PARTIAL TQ STALL&PUMP PRES INCREASE. P/U UP T/FREE,PUMP PRES REMAINED HIGH.ATTEMPT BK SURGING. REV CIRC T/750 PSI.NO MTR DIFFERENTIAL W/15 K ON BIT. 7.50 IS-D TR TOH W/POSSIBLE PLUGGED JETS. DATE: 06/07/2003 DSS: DEPTH: 16,865 MUD WT: 9.90 CUM COST TO DATE: 3,297,914.89 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.50 D TR TOH FOR PRESSURE INCREASE(WET) 3.00 D TR CLEAN FLOOR.C/O BHA.(PLUGGED JETS DUE T/MTR FAILURE).SURFACE TEST MWD. 3.25 D TR TIH W/BIT#10. 0.50 D RS SERVICE RIG. 1.50 D CC CIRCULATE&SHEAR MUD @ 14,082. 4.25 D TR TIH.ORIENT TOOL FACE ABOVE WINDOW T/150.WASH THRU TIGHT SPOT @ 15,804. 2.00 D TR WASH 100'T/BTM.CONDITION MUD. 8.00 D DR DRILL F/16,713 T/16865. DATE: 06/08/2003 DSS: DEPTH: 17,129 MUD WT: 9.80 CUM COST TO DATE: 3,365,209.39 HOURS PH OP ACT ACTIVITY DESCRIPTION 18.00 D DR DRILL F/16,685 T/17,129. 1.50 D CC OBSERVE 200 PSI PRESSURE LOSS.TEST SURFACE EQUIPMENT.LOST MWD SIGNAL.CIRCULATE,NO ADDITIONAL PUMP PRES.LOSS. 1.00 D TR TOH T/16,850.PUMP OUT T/16,600.EXCESS DRAG. 1.50 D CC CBU WHILE RT&RECIP.NO ADDITIONAL PRESSURE LOSS. 2.00 D TR TOH.(SLICK T/WINDOW) DATE: 06/09/2003 DSS: DEPTH: 17,129 MUD WT: 9.90 CUM COST TO DATE: 3,434,710.87 Page No: 9 Coovriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 PE C uPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ HOURS PH OP ACT ACTIVITY DESCRIPTION 7.00 D TR TOH F/MWD FAILURE.CULL 14 JTS HT 40 F/HARD BAND.C/O MWD PROBE.(PROBE BENCH TESTED OK.) 0.50 D RS SERVICE RIG. 8.00 D PT TEST BOP,250/3,000 PSI.REPLACE MANUAL CHOKE VALVE.STATE WAIVED WITNESSING TEST. 3.00 D TR CLEAN FLOOR.MK UP BHA#20. P/U 14 JTS HT 40. 5.50 D TR TIH. FILL PIPE&CHECK MWD EVERY 2,000'. DATE: 06/10/2003 DSS: DEPTH: 17,490 MUD WT: 9.80 CUM COST TO DATE: 3,509,417.75 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 D TR TIH W/BHA#20 T/14,650. 1.00 D RS SERVICE RIG,C/O SAVER SUB.CIRC/SHEAR MUD. 1.00 D RS CUT/SLIP DRLG LINE. 3.75 D TR TIH.WASH&REAM BRIDGES @ 16,660&16,780.WASH T/BTM. 11.75 D DR DRILL F/17,129 T/17,362. 0.50 D CC RT&RECIP F/HOLE CLEANING. 5.50 D DR DRILL F/17,362 T/17,490 DATE: 06/11/2003 DSS: DEPTH: 17,733 MUD WT: 9.80 CUM COST TO DATE: 3,578,958.93 HOURS PH OP ACT ACTIVITY DESCRIPTION 5.00 D DR DRILLING F/17,490 T/17,551.(CONDUCT LOAD TEST F/TURBINES CIRC/RT 20 MIN) 0.50 D RS SERVICE RIG. 0.50 D RS TURBINE FLAME OUT. 1.75 D DR DRILL F/17,551T/17,596.CHECK SHOT SURVEY. 0.50 D CC CIRC/RT/RECIP F/HOLE CLEANING. 4.50 D DR DRILL F/17,596 T/17,665. 1.00 D RS TURBINE DN ON DIFFERENTIAL GRD.SWAP T/CAT POWER AFTER TROUBLESHOOTING. 10.25 D DR DRILL F/17,665 T/17,733. DATE: 06/12/2003 DSS: DEPTH: 17,809 MUD WT: 9.80 CUM COST TO DATE: 3,649,083.52 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 D DR DRILL F/17,732 T/17,735. PUMP HIGH VIS SWEEP. 0.50 D CC RT,RECIP&CIRC.CLEAR BIT W/SWEEP. 5.50 D DR DRILL F/17,735 T/17,787. 0.25 D RS SWAP BK T/SHORE POWER. 6.75 D DR DRILL F/17,787 T/17,805. 0.50 D CC RT, RECIP&CIRC. 2.00 D DR DRILL F/17,805 T/ 17,809. 8.00 D TR TOH W/BIT 11R DATE: 06/13/2003 DSS: DEPTH: 17,866 MUD WT: 9.85 CUM COST TO DATE: 3,742,292.82 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.50 D TR POH.Change BHA. 5.00 D TR RIH to window. 1.00 D CC Circulate,shear mud and service rig. 1.00 D TR RIH.Tight at 15550'. Page No: 10 Coovriaht©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 rERATIONS SUMMARY REPORT • WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 06/13/2003 DSS: DEPTH: 17,866 MUD WT: 9.85 CUM COST TO DATE: 3,742,292.82 8.00 D TR Wash and ream with stiff assmbly to 17770'. 1.50 D WR Ream undergauge hole to bottom. 4.00 D DR Drill with bit#12 to 17866' DATE: 06/14/2003 DSS: DEPTH: 18,091 MUD WT: 9.80 CUM COST TO DATE: 3,816,837.08 HOURS PH OP ACT ACTIVITY DESCRIPTION 22.50 D DR Drill from 17866'to TD at 18091'. 1.50 D CC Condition hole for logs. DATE: 06/15/2003 DSS: DEPTH: 18,091 MUD WT: 9.90 CUM COST TO DATE: 3,880,030.58 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.50 D CC Circulate,rotate and reciprocate cleaning hole at bottom. 10.00 D TR Pump,pull and back ream into shoe. 1.00 D RS Normal rig service 1.50 D CC Circulate the hole clean. 4.00 D TR RIH.Wash 15150', 15300'&17900'to 18091'. 10'fill on bottom. 4.00 D CC Circulate for logs. DATE: 06/16/2003 DSS: DEPTH: 18,091 MUD WT: 9.85 CUM COST TO DATE: 3,944,682.94 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 D CC Condition the hole at bottom. 1.00 D TR Trip out of the hole pumping to 17464'. 2.00 D CC Circulate bottoms up for hole drag. 4.00 D TR Pump out to 16901'.Pulled free from 16901'to shoe. 1.50 D RS Normal rig service.Cut drilling line. 5.00 D TR RIH.Clean out coal bridges to 15200' 6.50 D TR RIH.Ream from 17150'to bottom. 18'fill. 2.50 D CC Circulate at bottom. 1.00 D TR POH with stiff assembly.Pumping each stand out. DATE: 06/17/2003 DSS: DEPTH: 18,091 MUD WT: 9.85 CUM COST TO DATE: 4,032,644.80 HOURS PH OP ACT ACTIVITY DESCRIPTION 7.50 D TR Pump out of the hole to 14440'. 2.00 D CC Circulate hole clean. 1.00 D RS Normal rig service.Change out saver sub. 5.50 D TR RIH.Ream out bridges at 15285', 15335 to 15345'.RIH. 8.00 D TR Ream and clean hole from 16534'. Depth 17550'at report time. DATE: 06/18/2003 DSS: DEPTH: 18,091 MUD WT: 10.05 CUM COST TO DATE 4,114,413.96 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 D TR Finish reaming to bottom with many areas of torque and drag. 3.50 D CC Condition hole,raise MW to 10+ppg. 2.00 D TR Circulate out each stand to 17597'. 2.00 D TR Attemp to pull pie without circulation.Unsuccessful.Regain circulation.Work pipe free. Page No: 11 Coovriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 •hh r C1 OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 06/18/2003 DSS: DEPTH: 18,091 MUD WT: 10.05 CUM COST TO DATE: 4,114,413.96 3.00 D CC Circulate to clean the hole. 0.50 D TR Pump out to 17384'.Packing off. 3.00 D CC Circulate with 300 gpm and 110 RPM. 2.00 D TR Pump out to 16807'.Tight hole. 2.50 D CC Circulate below 16807'with 110 RPM and 300 GPM. 1.00 D TR Pump out to 16126'.Packing off. 1.50 D CC Circulate to clean the hole at 16126' DATE: 06/19/2003 DSS: DEPTH: 18,091 MUD WT: 10.00 CUM COST TO DATE: 4,179,403.27 HOURS PH OP ACT ACTIVITY DESCRIPTION 6.00 D TR Pump,wash and pull until)unable to pass 15040'. 6.00 D TR Back ream up through coal bridges from 15040'. Free at 14995'. 1.50 D TR Pull into casing to 14182'. 1.50 D CC Circulate the hole clean. 9.00 D TR Lost 1000 psi pump pressure. POH wet looking for washout.BHA left in the hole. DATE: 06/20/2003 DSS: DEPTH: 18,091 MUD WT: 10.00 CUM COST TO DATE: 4,254,940.53 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-D RS SERVICE RIG. 7.50 IS-D PT TEST BOP 250!3,000 PSI.AOGC WITNESSED.ANNULAR TEST FAILED. 9.50 IS-D BO CLEAN FLOOR.CHANGE OUT HYDRIL ELEMENT. REBUILD#3 MACVOY ON CHOKE MANIFOLD.TEST. 0.50 IS-D RS CHANGE OUT SAVOR SUB. 0.50 IS-D TR L/D 18 JTS HWDP F/DERRICK. 2.00 IS-D TR M/U OVERSHOT(5 3/4 W/4 3/4"SPIRAL),TOPSUB,BUMPER SUB,JARS,12-4 3/4"DC'S&PUMP OUT SUB. 3.00 IS-D TR TIH.BRK CIRC EVERY 1,000'. [DATE: 06/21/2003 DSS: DEPTH: 18,091 MUD WT: 10.00 CUM COST TO DATE: 4,318,370.21 HOURS PH OP ACT ACTIVITY DESCRIPTION 12.00 IS-D Fl TIH W/OVERSHOT.BRK CIRC EVERY 1,000'.WASH THRU COALS. 0.75 IS-D Fl TAG&ENGAGE FISH @ 16,850.W/40 K DN WT. PRES INC&30K EXCESS DRAG. 11.25 IS-D Fl TOH T/SHOE.DROP DART. PUMP DRY JOB.TOH.RECOVERED FISH. [DATE: 06/22/2003 DSS: DEPTH: 18,091 MUD WT: 10.05 CUM COST TO DATE: 4,376,791.59 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 IS-D Fl LID FISH&FISHING TOOLS. 1.00 IS-D RS CUT!SLIP DRLG LINE.INSPECT,ADJUST BRAKES. 1.50 D TR P/U&RUN BHA. 0.50 D RS XO T/HT 40 TOOLS.SWAP T/RIG POWER. 0.50 D TR TIH W/CLEAN OUT ASSY. 0.50 D RS SERVICE RIG. 4.50 D TR TIH T/14,600. 3.00 D CC CIRCULATE/SHEAR MUD WHILE RECIP/RT @ 14,600.HEAVY RETURNS SAND,SILT&COAL. 8.50 D TR TIH.SLICK T/16,900.W&R 16,963,16,995&17,133.WASH T!BTM. REAM TIGHT AREAS. 1.50 D CC CIRCULATE,SWEEP&CONDITION HOLE.RECIP/RT&PUMP 350-375 GPM. Page No: 12 Canvriaht n 1993-2002 by Epoch WellSite Services.Inc. All rights reserved. 411 Today's Date: 09/05/2003 PERC �' OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 06/23/2003 DSS: DEPTH: 18,091 MUD WT: 10.20 CUM COST TO DATE: 4,437,612.73 HOURS PH OP ACT ACTIVITY DESCRIPTION 6.00 D CC PUMP HIGH VIS SWEEP,CIRC GOUT©370 GPM w/RECIP/RT. HEAVY RETURNS,PUMP 2ND SWEEP,STD BK STAND,CONT CIRC. 1.50 D WR WASH&REAM 18,002-17,883.TIGHT. 3.00 D TR PUMP OUT OF HOLE F/18,091 T/17,300.NO PUMP&SLICK F/17,300 T/16,567. 0.50 D RS WORK ON SWIVEL PACKING. 7.50 D WR TIH F/16,567.WORK TIGHT AREAS @ 17,038&17,690.WASH T/BTM,NO FILL. 24.00 D CC SWEEP HOLE W/RECIP/RT.RAISE MW F/10.1 T/10.2 PPG. DATE: 06/24/2003 DSS: DEPTH: 18,091 MUD WT: 10.30 CUM COST TO DATE: 4,510,015.22 HOURS PH OP ACT ACTIVITY DESCRIPTION 10.00 IS-D TR TOH W/NO PUMP T/SHOE.WORK W/PUMP TIGHT AREAS©17,900, 17,850&17,000, 16,890.SLICK F/16890 T/ 14,669. 0.50 IS-D RS CLEAN FLOOR/SERVICE RIG. 1.50 IS-D RS C/O SWIVEL PACKING/WASHPIPE. 1.00 IS-D TR TIH T/15,200 0.50 IS-D RS ADJUST SWIVEL PACKING/GREASE 4.50 IS-D TR TIH T/16,895 W/NO PUMP.WORK TIGHT AREAS W/PUMP&RT @ 16,895, 17,015, 17,412.WASH T/BTM F/ 17,412. 4.00 IS-D CC PUMP HIGH VIS.CIRC @ 370 GPM W/RT&RECIP.RAISE MW F/10.2 T/10.4 PPG. 2.00 IS-D TR TOH W/NO PUMP EXCEPT @ 17,825&17,720. DATE: 06/25/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 4,571,946.01 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 IS-D TR TOH T/15,500.SLICK F/17,720 4.00 IS-D TR TIH.WORK TIGHT AREAS @ 16,800-845/17,545-560/17,700-740/17,850-880.WASH 90'T/BTM,NO FILL. 3.00 IS-D CC CIRC @ 370 GPM W/RT&RECIP. 11.00 IS-D TR TOH.17,913-17,818 WORK W/PUMP ATTEMPTING T/PK OFF,REGAIN FULL CIRC.SHUT DN PUMP&PULL THRU TWICE W/NO PUMP.TOH W/NO PUMP ASSIST. 1.00 IS-D LO PJSM.RIG UP SWS.P/U PLATFORM EXPRESS LOGGING TOOLS,LOAD RA SOURCES. 4.00 IS-D LO RIH W/SWS PLATFORM EXPRESS LOG. 16,700 @ REPORT TIME. DATE: 06/26/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 4,765,887.53 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.50 IS-D LO RIH W/SWS PLATFORM EXPRESS LOG.UNABLE T/PASS 17,523 W/LOGS.AFTER MULTIPLE ATTEMPTS,LOG OUT T/ 14,700. 1.00 IS-D RS CUT/SLIP DRLG LINE. 0.50 IS-D RS SERVICE RIG. 4.50 IS-D PT TEST BOPE 250/3,000 PSI.AOGC WAIVED WITNESSING. 7.50 IS-D RR CHANGE OUT KELLY HOSE.ADJUST TORQUE TUBE.CLEAN RIG. 2.00 IS-D TR BHA.L/D 12 4 3/4"DC'S. P/U 9 JTS 3 1/2 HWDP.STD BK FLEX DC'S&HWDP.C/O 2 BENT JTS HT 40. 4.00 IS-D WO WAIT ON SWS LWD TOOLS.CLEAN OBM F/RIG. DATE: 06/27/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 4,824,149.73 HOURS PH OP ACT ACTIVITY DESCRIPTION Page No: 13 f.nnvrinht n 1 991-2119 by Fnnch WallSite Services Inc All rinhts reserved_ Today's Date: 09/05/2003 CY �j E' OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 06/27/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 4,824,149.73 2.00 IS-D LO WAIT ON LOGGING TOOLS. 8.00 IS-D LO Rig up LWD surface equipment. 3.00 IS-D LO BHA. 8.50 IS-D LO RIH with LWD and clean out assembly. 2.50 IS-D LO LOG from 17200'.Depth 17600'at report time. DATE: 06/28/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 4,891,181.99 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 IS-D LO Continue LWD run to bottom.No fill. 3.00 D CC Condition hole. 1.50 D TR Short trip to 16900'.Pump out first 650'. 2.50 D TR Ream back to bottom.Several areas of torque. 2.50 D TR Circulate and condition hole. 3.00 D TR POH to window.Pump out first 650'. 0.50 D TR Dry job.Drop 2.25"drift. 7.00 D TR POH.Lay down LWD. 1.00 D TR Down load LWD tools. DATE: 06/29/2003 DSS: DEPTH: 18,091 MUD WT: 10.45 CUM COST TO DATE: 4,955,320.99 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 IS-D LO Down load and process LWD information. 9.50 IS-D LO Analyze logs.Rig maintenance. 5.00 C CS Pick up 85 joints of production liner. 7.50 C CS RIH with liner.Depth at report time 13500'. DATE: 06/30/2003 DSS: DEPTH: 18,091 MUD WT: 10.45 CUM COST TO DATE: 5,091,990.69 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 C CS Run production liner to window.Check circulation. Record torque,pressure etc. 3.00 C CS RIH.Liner would not pass 17721'.Work liner attemting to RIH. 9.00 C CS POH.Left liner in hole. 0.50 C RS Normal Rig service 2.50 C Fl Pick up fishing tools. 1.00 C RS Cut drilling line. 3.50 C TR RIH with spear. 1.50 C Fl Spear fish at 14229'.POH slow with liner. DATE: 07/01/2003 DSS: DEPTH: 18,091 MUD WT: 10.60 CUM COST TO DATE: 5,192,127.89 HOURS PH OP ACT ACTIVITY DESCRIPTION 12.00 IS-C Fl POH. Liner speared with grapple. 1.00 IS-C Fl Lay down fishing tools and liner top packer. 9.00 IS-C Fl Lay down recovered liner. Full recovery. 1.50 IS-C Fl Lay down fishing drill collars. 0.50 C AL M/U clean out assembly. DATE: 07/02/2003 DSS: DEPTH: 18,091 MUD WT: 10.65 CUM COST TO DATE: 5,251,625.25 Page No: 14 Coovriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 rr. ERATIONS SUMMARY REPORT 4111 WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 E C.: Plug Hemlock,Sidetrack to new Tar EVENT NO.: 1 EVENT D S g 9 HOURS PH OP ACT ACTIVITY DESCRIPTION 5.00 C TR RIH with clean out assembly. 3.00 C CC Condition mud. 2.00 C TR RIH.Ream tight hole 15150'to 15400'. 8.00 C WR Ream tight hole from 17080 to bottom.Hard reaming from 17698'to 17780'. 4.50 C CC Circulate the hole clean. 1.50 C TR Short trip to 17000'. DATE: 07/03/2003 DSS: DEPTH: 18,091 MUD WT: 10.60 CUM COST TO DATE: 5,311,149.77 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.50 C TR Ream back to bottom. 0.50 C CC Circulate. 0.50 C TR Wash out of hole to 17500'. 1.00 C TR Ream back to bottom. 1.00 C CC Circulate. 1.00 C TR Wash out of hole to 17530'. 2.00 C TR Ream back to bottom. 4.00 C TR Wash out of hole to 17300'.Pull to 15000'. 1.00 C TR Clean area at 15000'to 15100'. 2.50 C TR Work bumper jars. Regain pipe movement. 1.00 C TR Back ream from 14964'to 14910'.Pull into casing at 14820'. 1.50 C RS Rig service.Cut drilling line. 2.50 C TR RIH.Tight at 17770'. 2.00 C TR Ream tight area from 17770'to bottom. DATE: 07/04/2003 DSS: DEPTH: 18,091 MUD WT: 10.50 CUM COST TO DATE: 5,369,094.27 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.50 C CC CIRCULATE. 1.50 C TR SHORT TRI[P T/17,500.PUMP ASSIST @ 17,770. REAM 17,722-17,817.SLICK T/BTM.NO FILL. 1.00 C CC CIRCULATE,RECIP&RT. 2.00 C TR TOH,PUMP ASSIST T/17,480. 17,440,17,120&17,050 PULLED 50 K OVER. 2.00 C TR TOH T/WINDOW.PUMP DRY JOB. DROP 2.25 DRIFT. 6.00 C TR TOH.STD BK BHA. 1.50 C CS RIG UP T/RUN 5 1/2 LINER. 8.50 C CS PJSM.MK UPFLOAT EQUIP.RUN 5 1/2 LINER. DATE: 07/05/2003 DSS: DEPTH: 18,082 MUD WT: 10.50 CUM COST TO DATE: 5,575,653.72 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 C CS TIH 5 1/2 LINER ON DP T/17,790. 1.00 C CC CIRCULATE DP&LINER VOL.CHECK WTS&TQ.SET LIMITS. 2.00 C CS TIH W/LINER T/17,705.TIGHT. BRK CIRC.ATTEMT T/WASH THRU N/G. 9.50 C WR WASH&REAM LINER F/17,720 T/18,085.TIGHT&PACKING OFF.P/U CMT HEAD. 4.00 C CM PJSM.SWAP OVER T/BJ.PUMP 5 BBL H2O,TEST LINES T/5,000 PSI.START RT&RECIP,PUMP15 BBL H2O. PUMP 25 BBL MCS SPACER. PUMP 323 BBL 15.7 CLASS G CMT.DISPLACE W/260 BBL OBM.BUMP PLUG W/ 3,400 PSI,SET HANGER&CHECK FLOATS 3.5 BBL RETURN. 2.00 C CM Page No: 15 Coovriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 • PERK'✓ OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/05/2003 DSS: DEPTH: 18,082 MUD WT: 10.50 CUM COST TO DATE: 5,575,653.72 SET LINER TOP PACKER.UNSTING 22'REVERSE CIRC @ 5 BPM 2,900 PSI. 110 BBL CMT RETURNS. 1.00 C TR UD CMT HEAD.TOH 5 STDS 1.00 C CC CIRC LONG WAY DP VOLUME.PUMP DRY JOB. 0.50 C TR TOH W/RUNNING TOOL. DATE: 07/06/2003 DSS: DEPTH: 18,082 MUD WT: 10.50 CUM COST TO DATE: 5,631,447.92 HOURS PH OP ACT ACTIVITY DESCRIPTION 8.00 C TR TOH W/RUNNING TOOL. P/U CMT HEAD BRK DN&UD. 0.50 C RS SERVICE RIG. 2.50 C TR LID FLEX COLLARS F/DRK.P/U 9 5/8 SCRAPER BHA. 1.50 C TR TIH W/SCRAPER TO 7 5/8 LT @ 5,074. 2.00 C TR PUMP DRY JOB.TOH 4.00 C TR C/O BHA. P/U 7 5/8 SCRAPER BHA.TIH 1.00 C RS CUT/SLIP DRLG LINE.SERVICE RIG. 4.50 C TR TIH W/7 5/8 SCRAPER T/5 1/2 LT @ 14,583. NO STRINGERS. DATE: 07/07/2003 DSS: DEPTH: 18,082 MUD WT: 10.60 CUM COST TO DATE: 5,686,898.74 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 C CC CBU. PUMP DRY JOB. 6.50 C TR TOH W/7 5/8 SCRAPER.CULL HT 40 F/HARD BANDING. 2.50 C TR UD 3 1/2 HWDP&4 3/4 DC'S. 1.50 C TR CLEAR FLOOR.RIG T/P/U 3 1/8 DC'S&2 7/8 DP. 6.50 C TR P/U 9-3 1/8 DC'S&107-JTS 2 7/8 DP. 3.50 C TR TIH W/5 1/2 SCRAPER T/14,583. 1.00 C PT TEST 5 1/2 LINER T/3,000 PSI F/30 MIN. 108 PSI LOSS. 0.50 C TR TIH W/5 1/2 SCRAPER. IDATE: 07/08/2003 DSS: DEPTH: 18,035 MUD WT: CUM COST TO DATE: 5,760,544.61 HOURS PH OP ACT ACTIVITY DESCRIPTION 5.00 C TR TIH W/5 1/2 SCRAPER.WASH THRU CMT STRINGERS 17,085 T/17,860.WASH&RT THRU STRINGERS T/UC @ 17,996. 4.00 C CC CIRCULATE&CENTRIFUGE MUD.WOO. 3.50 C DC DRILL UC&CEMENT T/18,035. 3.00 C CC CBU 0.50 C PT TEST CASING T/3,000 PSI F/30 MIN. 168 PSI LOSS. 3.00 C TR TOH T/14,500. 5.00 C RS CLEAN PITS. DATE: 07/09/2003 DSS: DEPTH: 18,035 MUD WT: CUM COST TO DATE: 5,835,587.07 HOURS PH OP ACT ACTIVITY DESCRIPTION 24.00 C RS CLEANING PITS&SURFACE EQUIPMENT. DATE: 07/10/2003 DSS: DEPTH: 18,035 MUD WT: 8.50 CUM COST TO DATE: 5,900,124.73 HOURS PH OP ACT ACTIVITY DESCRIPTION Page No: 16 Coovriaht©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 P (r'Vi PERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/10/2003 DSS: DEPTH: 18,035 MUD WT: 8.50 CUM COST TO DATE: 5,900,124.73 8.00 C RS CLEAN PITS, FLUSH SURFACE EQUIP.CIRCULATE SOAPY WATER THRU ALL LINES. FILL PITS W/SEA WATER. SWACO-INJECT ALL EXCESS FLUIDS. 2.50 C TR TIH F/5 1/2 L/T T/18,025. 8.00 C CC REVERSE IN 50 BBL MAPCO,4 SPACERS&SEA WATER. 5.50 C CC ATTEMPT T/PK OFF W/SEA WATER ALL THE WAY AROUND.CIRCULATE THE LONG WAY. PUMP SWEEP& CIRCULATE OUT. DATE: 07/11/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 5,972,693.03 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 C CC Finish displacing oil based mud with seawater. 2.00 C TR Pull out of 5.5"liner. 4.50 C CC Clean mud pits and mix 5%KCL. 2.00 C TR RIH. Rig to reverse circulate. 4.00 C CC Pump sweep and displace with KCL. 8.50 C CC Circulate and filter KCL. 2.50 C CC Add ammonium nitrate marker and continue filtering fluid. DATE: 07/12/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,100,721.63 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 C CC Finish circulating filtered brine with ammoniun nitrate tracer.Final turbidity reading 166. 12.00 C TR POH lay down 2 7/8"tools. 8.50 C LO Logging&Evaluation USIT/CBL. 1.00 C RS Normal Rig service 2.00 C TR RIH with tie back sieve polish mill. DATE: 07/13/2003 DSS: DEPTH: 18,035 MUD WT: CUM COST TO DATE: 6,155,629.33 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.50 C TR RIH with polish mill. 1.00 C TR Polish tie back sleeve at 14583'. 1.50 C CC Circulate. 16.50 C TR Lay down drill pipe. 1.50 C PT Begin weekly BOP test. DATE: 07/14/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,283,988.33 HOURS PH OP ACT ACTIVITY DESCRIPTION 9.50 C PT Weekly BOP test.Replaced lower top drive valve. 8.00 C LO Perforate top hemlock 17784'to 17855'wire line measure. 2.00 C TR Load out wire line unit.Take on DST surface equipment. 4.50 C TR Pick up DST tubing.RIH. DATE: 07/15/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,338,207.33 HOURS PH OP ACT ACTIVITY DESCRIPTION 13.50 C TR Pick up 9.2#tubing with seal assembly and GLMs. 10.50 C WT Stab into tie back sieve. Rig up DST equipment. Page No: 17 cnnvrinht n 1993-2002 by Enoch WellSite Services.Inc. All riahts reserved. Today's Date: 09/05/2003 PERCY( PERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/16/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,457,523.33 HOURS PH OP ACT ACTIVITY DESCRIPTION 10.00 C WT Rig up surface equipment.Pressure test. 14.00 C WT Well on test. DATE: 07/17/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,506,980.33 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 C WT Flow well on DST. 6.00 C WT Shut off gas lift source.Allow tubing to bleed down.Rig up slick line with pressure gages.RIH. 13.50 C WT Shoot fluid level in annulus near 3 rd GLM at 12002'. Set gages at top perf. 4.00 C WT Start gas lift.Well on DST.Static rates after 23:00 hours. DATE: 07/18/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,557,347.83 HOURS PH OP ACT ACTIVITY DESCRIPTION 21.00 C WT START SHUT IN PERIOD @ 0800.TBG PRES 1104 PSI. 3.00 C WT POH W/SLICK LINE.BLEED GAS F/WELL T/FLARE. DATE: 07/19/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 6,609,749.83 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 C WT BLEED GAS OFF TBG.SHUT IN WELL. 3.00 C WT RIG DOWN SECTION OF PTS.RIG UP SCHLUMBERGER. 3.50 C WT RIH WITH GAMMA RAY/USIT TOOLS.TOOLS STUCK @ 14,380 WLM(BTM GAS MANDREL).WORK LINE T/ FREE. N/G 2.00 C WT RIG UP PTS. PRESSURE TEST LINES T/3,000 PSI. 2.50 C WT PULL 2 K OVER SWS WIRE WT. PRESSURE ANNULUS T/1,300 PSI W/GAS.TBG PRES @ 13 PSI,TOOLS FREE. 2.00 C WT POH W/SWS.BLEED GAS F/TEST LINES.BRK LUBRICATOR. NOSE SPRING OF LOGGING TOOL WAS WEDGED IN GAS MANDREL @ 14,380 WLM. 1.50 C WT RE-DRESS TOOLS W/CENTRALIZER @ NOSE.MK UP LUBRICATOR. 2.50 C WT RIH W/SWS TOOLS.WOULD NOT PASS 14,380(GLM)WORK LINE.N/G.POH W/SWS. 1.00 C WT BLEED OFF&BRK LUBRICATOR.MOVE CENTRALIZER UP 5'F/NOSE. 3.00 C WT RIH W/GR/USIT.WOULD NOT PASS 14,380. POH. L/D SWS TOOLS. 1.00 C WT RIG UP POLLARD SLICK LINE. DATE: 07/20/2003 DSS: DEPTH: 18,035 MUD WT: 8.65 CUM COST TO DATE: 6,685,599.29 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.50 C LO R/D SWS equipment&R/U Pollard slick line equipment 2.50 C PP Wireline-RIH 2.75"gauge ring-Won't go at 14,380'-POOH 2.00 C PP Bleed off-L/D slick line tools&lubricator-R/U SWS 0.50 C PP R/U SWS Lubricator 1.50 C PP RIH w/SWS gr/usit logs,2 centralizers&impression block,would not pass 14,380. 2.00 C PP POH w/ logs.Bleed off gas t/PTS. 1.50 C PP R/D SWS-Complete bleed down. R/D test tree 4.00 C CC R/U to Rev Circ.257 BBLs to fill annulus.rev circ 3 dp volumes. 2%solids. 1.50 C PP R/U test tree&Pollard Wireline&lubricator&test to 2500 psi- 2.50 C PP RIH w/Pollard 2.73"gauge ring.Would not pass 14,380,work line n/g. POH.bleed off.r/d 1.50 C TR R/U,Unsting seal assy f/pbr..-monitor well backside heavy U tbg Page No: 18 Cnnvrinht n 1993-2002 by Enoch WellSite Services. Inc. All rights reserved. Today's Date: 09/05/2003 FERIA" PERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/20/2003 DSS: DEPTH: 18,035 MUD WT: 8.65 CUM COST TO DATE: 6,685,599.29 1.50 C CC Reverse Circ&monitor well balance 1.50 C TR Atempt t/TOH.Excessive drag.-Work pipe. DATE: 07/21/2003 DSS: DEPTH: 18,035 MUD WT: 8.55 CUM COST TO DATE: 6,739,111.29 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.50 C TR ATTEMPT T/TOH W/3 1/2 TBG&GLM'S.EXCESSIVE DRAG&SMALL PIPE MOVEMENT.WORK PIPE. 4.50 C CC CIRCULATE&WORK PIPE IN DIFFERENT COMBINATIONS. 1380 UNITS GAS @ BU,TAKE THRU GAS BUSTER. 2.00 C CC CIRCULATE.TRANSFER CRUDE F/PRODUCTION T/UP RIGHT TANK.TRANSFER T/PILL PIT. 6.50 C CC SPOT 50 BBL CRUDE @ BTM OF TBG. PUMP 1/2 BPM INTO ANNULUS WHILE WORKING PIPE.CRUDE TI SURFACE @ 5140 STKS.CALCULATED=8900 STKS T/SURFACE. 1200 UNITS GAS @ B.U.GO THRU GAS BUSTER 6.50 C CC MONITOR WELL.,STATIC.BRK HEAD PIN LOAD CARBIDE MARKER.MIX 1/2 PPB FLOW-VIS T/ACTIVE SYSTEM.CARBIDE RETURNED @ 8900 SKS.(CALCULATED) 3.00 C CC MIX/PUMP 60 BBL LUBE-TEX,CRUDE,FLOW VIS PILL.WORK PIPE WHILE PUMPING PILL ACROSS GLM'S. GAINED 10'PIPEMOVEMENT. DATE: 07/22/2003 DSS: DEPTH: 18,035 MUD WT: 8.50 CUM COST TO DATE: 6,823,657.16 HOURS PH OP ACT ACTIVITY DESCRIPTION 22.00 C TR WORKING 3 1/2 TUBING.CIRCULATING CRUDE,LUBETEX, FLOW-VIS PILLS,ATTEMPTING T/FREE TBG/ MANDRELS.MADE A TOTAL OF 53'. 2.00 C CC RIG UP&REV CIRC.@ 5 1/2 BPM @ 1150 PSI. DATE: 07/23/2003 DSS: DEPTH: 18,035 MUD WT: 8.50 CUM COST TO DATE: 6,874,782.16 HOURS PH OP ACT ACTIVITY DESCRIPTION 10.50 IS-D CC CIRC&WORK PIPE,ATTEMPT T/FREE TBG.N/G.R/D PTS EQUIP&CLEAR DECK.UNLOAD APRS&FISHING EQUIP.F/BOAT. 4.50 IS-D SL RIG UP APRS.P/U 20 K OVER UP WT T/190K.LOCATE&CUT TBG @ 11,984 WLM. 3.50 IS-D SL POH W/APRS,COULD NOT PASS 11,946,FREE DN. WORK LINE. N/G.WORK LINE TENSION UP F/1700 T/3400 LBS&PULL OUT OF ROPE SOCKET. POH W/APRS. 1.00 IS-D TR P/U ON TUBING,FREE @ 130K UP WT,LOST 40 K WT.L/D"WET TBG" 4.50 IS-D TR PUMP DRY JOB.TOH LAYING DN 3 1/2 TBG. DATE: 07/24/2003 DSS: DEPTH: 18,035 MUD WT: 8.50 CUM COST TO DATE: 6,926,204.36 HOURS PH OP ACT ACTIVITY DESCRIPTION 12.00 IS-C TR TOH W/3 1/2 TUBING WHILE WORKING BOAT.L/D 381 JTS&9.75 STUB.DRIFT LAST 10 JTS,NO OBSTRUCTION FOUND. 0.50 IS-C RS SERVICE RIG. 4.00 IS-C PT TEST BOPE.250/3000 PSI.AOGC WAIVED WITNESSING. 2.50 IS-C TR MK UP FISHING BHA.5 3/4 OS.W/3 1/2 BG.9 4 3/4 DC'S,BUMPER SUB,OIL JAR,ACC JAR. 5.00 IS-C TR P/U HT 40 DP, DRIFT,TIH. DATE: 07/25/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,069,011.85 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.50 C Fl Pick up 4"drill pipe work string with overshot. Page No: 19 Copyright©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. Today's Date: 09/05/2003 PERC if PERATIONS SUMMARY REPORT II WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/25/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,069,011.85 3.50 C Fl Engage fish at 11984'.Jar on fish.No movement. 0.50 C Fl Test casing to 3000 psi.Good test. 13.00 C Fl Rig up and run 1"free point tool.Would not enter top of fish.POH. 2.50 C FI Release overshot and POH. DATE: 07/26/2003 DSS: DEPTH: 18,035 MUD WT: CUM COST TO DATE: 7,138,910.25 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 C Fl POH with overshot. Drift drill pipe to 2.5" 1.50 C Fl Lay down fishing assembly. 3.00 C Fl Run 4.55"impression block on slick line.Tubing cut off is misshapened with limited inside diameter. 3.00 C Fl Machine Baker's dress off mill for 3.5"tubing 4.50 C Fl RIH with tubing dress off mill. 0.50 C Fl Polish off fish at 11984'. 5.00 C Fl POH.Mill showed good wear pattern. 2.00 C Fl Run slick line 2.3"grapple to retrieve chemical cutter inside tubing.Would not enter top of tubing. 2.50 C Fl Run slick line 4.55"impression block.Little impression made due to shavings bed. C DATE: 07/27/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,196,803.25 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.50 C Fl RIH with overshot and jars on drill string. 1.50 C RS Cut and slip drilling line.Service rig. 6.00 C Fl Set overshot on fish.Circulate and work pipe while BJ Services mixes and delivers acid. 1.00 C Fl Pump 14.5 bbls BJ Service's"one shot acid"around tail of fish. 2.00 C Fl Allow acid to saturate. 5.50 C Fl Move acid by the fish 1 bbl each 30 min.411'total. 1.50 C Fl Jar on fish.No movement. 2.00 C Fl Move acid up hole to surround second gas lift mandrel.Allow to saturate. DATE: 07/28/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,250,173.13 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 C Fl Jar on fish with acid spotted in stuck area. No movement. 2.00 C Fl Circulate acid from well. 2.50 C Fl Run 1.75"impression block on slick line. Results show clear impression of rope socket at 14299'. 7.50 C Fl Run free point. Pipe is free to 14280'. 5.50 C Fl Unlatch overshot. Pull drill pipe from hole. 3.00 C Fl Run 2.33"latching tool with 2.75"centralizer on slick line.Would not pass 13007'. 3.00 C Fl Latch rope socket at 14299'with 1.3125"tool. Pull on fish.POH. DATE: 07/29/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,308,390.13 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 C Fl Run 4.55"impression block on slick line to top of fish at 11984'.Well is clear. 3.00 C Fl Run 2.33"JU latching tool.Catch fish at 14299'. Pulled off of fish. 7.50 C Fl Catch inside fish with 2"JD tool. Line parted after jarring.Splice line&POH. Rig down slick line. 1.00 C Fl Make up fishing tools on drill pipe. Page No: 20 Copyright©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. dikToday's Date: 09/05/2003 PERK,' TPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 07/29/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,308,390.13 3.50 C Fl RIH with overshot.Latch fish at 11984'. 1.00 C Fl Circulate drill string volume. 6.00 C Fl RIH with 2 3/8"chemical cutter.Tag inside fish at 14287'. DATE: 07/30/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,407,945.83 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.00 C Fl Chemical cut tubing at 14257'.Rig down wire line. 2.00 C Fl Circulate bottoms up. 10.00 C Fl POH. Lay down 71 joints and two gas lift mandrils of recovered fish. 7.00 C Fl RIH with jars and overshot. 1.00 C Fl Wash down to fish. Begin jarring.Top of fish at 14263'. DATE: 07/31/2003 DSS: DEPTH: 18,035 MUD WT: 8.60 CUM COST TO DATE: 7,466,683.83 HOURS PH OP ACT ACTIVITY DESCRIPTION 8.00 C Fl Jar on fish at 14263'.No Movement. 6.00 C Fl POH.Lay down fishing tools. 0.50 C RS Derrick inspection. 3.50 C PT Test BOP. 4.50 C Fl RIH with 128'of wash pipe with out side pipe cutter. 1.00 C RS Cut drilling line. 0.50 C Fl RIH with outside pipe cutter. DATE: 08/01/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,523,317.03 HOURS PH OP ACT ACTIVITY DESCRIPTION 1.00 C Fl RIH W/OUTSIDE CUTTER&WASH OVER FISH AT 14263 TO 14317(COULD NOT GO PAST 14317 1.50 C Fl WORK CUTTER-ATTEMPT TO CUT TBG AT 14311(APPEARED TO BE CUT) 5.50 C Fl POH 1.50 C Fl LAY DN WASH PIPE(NO FISH)EVIDENCE OF POSSIBLE COLLAPSED CSG 0.50 C RS Normal Rig service 4.00 C PT LAY DN 4 3/4 DC'S R/U BJ-PJSM 1.00 C PT PULL WEAR RING-RUN TEST PLUG-TEST LINES, RISER&BLINDS TO 5000 PSI 4.00 C PT PRESSSURE UP WELL IN 500 PSI INCREMENTS TO ESTAB INJECTION RATE OF 3 BPM AT 4950 PSI-PUMPED TOTAL OF 74 BBL-GOT BACK 23 BBL 4.50 C TR P/U OVER SHOT DRESSED W/3 1/2 GRAPPLES-RIH 0.50 C Fl BREAK CIR-ATTEMPT TO WORK OVER FISH AT 14263 DATE: 08/02/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,584,134.23 HOURS PH OP ACT ACTIVITY DESCRIPTION 5.00 C Fl LATCH ONTO FISH AT 14263-WORK&PULL ON FISH-UNABLE TO FREE ANYTHING 0.50 C Fl RELEASE OVERSHOT F/3 1/2 TBG FISH AT 14263 6.00 C TR POH W/OVERSHOT 2.00 C TR M/U BURNING SHOE-5 JTS 5 3/4"WASH PIPE-BUMPER SUB&JARS-(9)4 3/4"DC'S-ACC JARS 4.50 C TR RIH 3.00 C Fl WASH OVER 3 1/2 TBG AT 14263 TO 14317-MILLED F/14317 TO 14319 Page No: 21 Copyright©1993-2002 by Epoch WeilSite Services, Inc. All rights reserved. • Today's Date: 09/05/2003 PE C" OPERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 08/02/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,584,134.23 1.50 C CC PUMP SWEEP&DRY JOB 1.50 C TR POH DATE: 08/03/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,640,144.43 HOURS PH OP ACT ACTIVITY DESCRIPTION H PIPE 6.50 C TR POH W/BURNING SHOE&WASH 0.50 C RS SERVICE TOP DRIVE,CROWN,BLOCKS&DRAWWORKS 4.00 C LO GET SCHLUMBERGER USIT TOOL READY&FLOWN OUT F/SCHLUMBERGER'S YARD 10.00 C LO PJSM-RUN USIT LOG F/10250 TO 9365 0.50 C Fl LAY DN WASH PIPE 2.50 C TR RIH W/4 3/4 DC'S&4"DRILL PIPE&LAY DN SAME DATE: 08/04/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,725,272.63 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.00 C TR FINISH LAYING DN 4"DP,9 DC'S,JARS&BUMPER SUB 5.00 C TR M/U BAKER OUTSIDE CUTTER, BHA&DP 1.00 C RS SLIP&CUT DRILL LINE 3.00 C TR RIH 2.00 C Fl WORK OVER FISH&ATTEMPT TO CUT 3 1/2 TBG AT 14311 5.50 C TR POH 1.00 C TR UD FISH(49.65'OF 3 1/2 TBG)&WASH PIPE 2.50 C SL R/U POLLARD WIRELINE RUN 4.5"IMPRESSION BLOCK DATE: 08/05/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,775,193.63 HOURS PH OP ACT ACTIVITY DESCRIPTION 3.00 C SL RUN 2.5"IMPRESSION BLOCK TO 14285'&POH 5.00 C SL DRESS&RIH WI WIRELINE OVERSHOT-LATCH ONTO FISH AT 14281'(WLM)-POH W/SLICK LINE-UD CHEMICAL CUTTER&FISHING TOOLS 7.00 C SL M/U 1.70 IMPRESSION BLOCK-RIH-TAG TOP TBG 14311'(WLM)-WORK PAST TOP OF TBG TO 14321'(WLM)- POH-APPEARED TO HAVE BEEN ALONG OUTSIDE OF TBG 4.50 C TR M/U OVERSHOT ON DRILL PIPE-RIH 0.50 C TR WASH TO FISH-TAG&LATCH ONTO FISH AT 14313(ABLE TO PUMP THRU FISH) 4.00 C Fl R/U&RUN APRS W/1.0"COLLAR LOCATOR-(1.0"COLLAR LOCATOR STOPS 29'BELOW TOP OF FISH)TOP OF FISH DPM 14313'-WLM 14342'-SET DN WLM 14371' C DATE: 08/06/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,839,883.83 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 C Fl FINISH POH W/1.0"COLLAR LOCATOR 11.50 C SL R/U POLLARD.125 SLICK LINE-RUN 1.70"IMPRESSION BLOCK,STOPPED AT 14345'WLM(INDICATION OF BEING PINCHED)-RUN A 1.0"IMPRESSION BLOCK,STOPPED AT 14345'WLM(INDICATES BEING PINCHED)- RUN 1.0"DRIVE DN BAILER(NO SOLIDS IN BALER)-THE BTM OF BALER WAS EGGED-IT STOPPED AT 14345' ALSO 6.50 C TR RELEASE OVERSHOT F/FISH-POH Page No: 22 Copyright©1993-2002 by Epoch WeliSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 PE C'' PERATIONS SUMMARY REPORT WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 08/06/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,839,883.83 1.50 C TR L/D OVERSHOT P/U BHA 2.00 C TR RIH W/OVERSHOT&JARRING ASS'Y DATE: 08/07/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,911,366.03 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.50 C Fl RIH W/OVERSHOT&JARRING ASS/Y 1.00 C Fl WASH OVER FISH AT 14313'-JARRED ON FISH W/70K OVER PULL-PULLED FREE 6.00 C Fl POH-LAY DN FISH(8.6'PIECE OF 3 1/2 TBG)FISH HAD BEEN SLICED ON THE LAST FOOT,ON ONE SIDE 3.00 C PT TEST BOP'S-250&3000 PSI(TOM MAUNDER WI AOGCC WAIVED THE WITNESSING OF THE BOP TEST) 0.50 C RS SERVICE CROWN,BLOCKS&DW 1.00 C Fl M/U 5 3/4"OVERSHOT DRESSED W/3 1/2 GRAPPLES&5 3/4"HOLLOW MILL W/3 1/2"CARBIDE INSERT W/5 3/4" BY 4 15/16 ID CUT LIP GUIDE 4.00 C Fl RIH TO 10700' 1.00 C RS SLIP&CUT DRILLING LINE 1.00 C Fl FINISH TIH 1.00 C Fl WASH DN TO 14317'-START TAKING WT-SET DN 20K-P/U&ROTATE DN-STALLED OUT&TAKING WT AT 14317'-SET DN 40K(TOP OF FISH AT 14321') 3.00 C Fl POH DATE: 08/08/2003 DSS: DEPTH: 18,035 MUD WT: 8.70 CUM COST TO DATE: 7,965,935.91 HOURS PH OP ACT ACTIVITY DESCRIPTION 4.00 C TR POH-LAY DN 5 3/4 OVERSHOT DRESSED W/3 1/2 GRAPPLES(NO RECOVERY) 9.00 C SL R/U POLLARD SLICK LINE-RUN 4.5"IMPRESSION BLOCK TO 14318'(WLM) 5.50 C TR M/U BHA-RIH W/CUT-OFF JT OF 2 3/8 TBG ON BTM 0.50 C TR WASH 2 3/8 TBG INTO 3 1/2 TBG AT 14321 -WASH DN TO 14325' 5.00 C Fl PREP WELL F/CAMERA RUN(DHV) DATE: 08/09/2003 DSS: DEPTH: 18,035 MUD WT: 8.80 CUM COST TO DATE: 8,033,047.11 HOURS PH OP ACT ACTIVITY DESCRIPTION 2.00 C CC PREPARE F/CAMERA RUN 7.00 C TR POH-LAY DN 2 3/8 MULE SHOE 2.00 C TR M/U 4 11/16"OVERSHOT DRESSED-W/3 1/2 SPIRAL GRAPPLES-2 JUNK BASKETS 5.00 C TR TRIP IN HOLE 4.50 C Fl CIR&ROTATE F/14310'-ENCOUNTER OBSTRUCTION AT 14317'-WORK&MILL DN TO TOP OF FISH AT 14321 - MILL OVER FISH TO 14326(PUMP HI-VIS SWEEP)-SLACK OFF TO 14329 W/15K STACKED ON IT-ATTEMPT TO CATCH FISH W/OVERSHOT 1.50 C CC CIR SWEEP TO SURFACE 2.00 C TR POH DATE: 08/10/2003 DSS: DEPTH: 18,035 MUD WT: 8.80 CUM COST TO DATE: 8,085,494.87 HOURS PH OP ACT ACTIVITY DESCRIPTION Page No: 23 Copyright©1993-2002 by Epoch WellSite Services,Inc. All rights reserved. Today's Date: 09/05/2003 PER ' ERATIONS SUMMARY REPORT III I WELL NAME: REDOUBT UNIT#4A AFE NO: 035541 RIG NAME: WELL ID NO.: 507332050601 1 FIELD NAME: REDOUBT SHOAL API NO.: 50-733-20506-01 EVENT NO.: 1 EVENT DESC.: Plug Hemlock,Sidetrack to new Targ DATE: 08/10/2003 DSS: DEPTH: 18,035 MUD WT: 8.80 CUM COST TO DATE: 8,085,494.87 6.00 C Fl POH W/4 11/16"OVERSHOT DRESSED W/3 1/2 SPIRALGRAPPLES-LAY DN FISH(RECOVERED 9'TWISTED PIECE OF 3 1/2"TBG&5.25'SLICE OF 7 5/8 CSG W/BUTTRESS THREAD ON THE PIN-RECOVERED METAL& FORMATION IN JUNK BASKETS) 2.50 C TR LAY DN FISHING TOOLS&ALL OF BHA 4.50 C TR RIH W/4"DRILL PIPE 11.00 C TR LAY DN HT-40 DRILL PIPE DATE: 08/11/2003 DSS: DEPTH: 18,035 MUD WT: 8.80 CUM COST TO DATE: 8,137,054.87 HOURS PH OP ACT ACTIVITY DESCRIPTION 0.50 C TR Lay down drill pipe. 3.50 C BP Set Tubing Hanger and test seals. 5.50 C BP ND BOP. 2.50 C BP Set tree and test to 4500 psi.Pull BPV. 12.00 C MO Clean pits and inject waste fluids.Demob from RU#4A. DATE: 08/12/2003 DSS: DEPTH: 18,035 MUD WT: 8.80 CUM COST TO DATE: 8,187,742.87 HOURS PH OP ACT ACTIVITY DESCRIPTION 24.00 IS-D MO Rig down from RU#4A.Rig released At 06:00 hrs. Page No: 24 Copyright©1993-2002 by Epoch WellSite Services, Inc. All rights reserved. . • STATE OF ALASKA , ALASKA OIL AND GAS CONSERVATION COMMISSION Aci�� - APPLICATION FOR SUNDRY APPROVALS Sr gilt 1.Type of Request: Abandon: Suspend: _ Operation shutdown: X Re-enter suspended well: _ Alter casing: _ Repair well: _ Plugging: _ Time extension:_ Stimulate: — Change approved program: Pull tubing: Variance: Perforate: Other: 2. Name of Operator 5.Type of well: 6.Datum elevation(DF or KB) Forest Oil Corporation Development: X 90'MSL 3.Address Exploratory: _ 7.Unit or Property name 310 K Street,Suite 700 Stratigraphic: _ Redoubt Unit Anchorage,Alaska 99501 Service: 4.Location of well at surface 8.Well number 1915'FSL,313'FEL,Sec. 14,TO7N, R14W,SM Redoubt Unit#4A At top of productive interval 9.Permit number 974'FNL,848'FWL,Sec.20,TO7N,R13W,SM 203-081 At effective depth 10.API number 105'FNL,670'FEL,Sec. 19,TO7N,R13W,SM 50-733-20506-01 At total depth 11.Field/Pool 1010'FNL,945'FWL,Sec.20,TO7N,R13W,SM Redoubt Shoal Field 12. Present well condition summary Total depth: measured 18,091' Plugs(measured) true vertical 12,472' Effective depth: measured 14,319' Junk(measured) 14,319'to 14,574' true vertical 9,252' 3 1/2"9.3#L-80 tubing,GLM,Seal Assembly Casing Length Size Cemented Measured depth True vertical depth Structural N/A N/A N/A N/A N/A Conductor 200' 30" Driven 200' 200' Surface 3,530' 13 3/8" 6462 cu ft 3,530' 2,918' Intermediate 10,517' 9 5/8" 4613 cu ft 10,517' 7,114' Drilling Liner 9,746' 7 5/8" 258 cu ft 14,820' 9,565' Production Liner 3,499' 5 1/2" 1792 cu ft 18,082' 12,467' Perforation depth: measured 17,784'to 17,855' 6spf F 4P true vertical 12,182'to 12,248' Tubing(size,grade,and measured depth) `` t f Packers and SSSV(type and measured depth) 13.Attachements Description summary of proposal: X Detailed operations program: — BOP sketch: 14. Estimated date for commencing operation 15.Status of well classification as: 11-Aug-03 / 16. If proposal well verbally approved: Oil: Gas: _ Suspended: Name of approver Date approved Service: 17. I hereby certify+ at the foregoing is true and correct to the best of my knowledge. 1 2 Signed: Title: Drilling Manager, Forest Oil Corporation Date: \, Q FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Approval Noy Plug integrity BOP Test Location clearance ✓�� Mechanical Integrity Test Subsequent form required 10- AO y ,..1-.;\W∎*.3oZt..y c, Approved by order of the Commissioner Commissioner Date 1 rj Form 10-403 Rev 06/15/88 ORIGit' A. SUBMIT IN TRIPLICATE Redoubt Unit#4A• Casing Schematic -July 2003 30" A-36 200 TVD 150# Welded 200 MD • 13 3/8" L-80 2918 TVD • 68# BTC 3530 MD P TOL @ 5074 MD • 9 5/8" L-80 7114 TVD 47# BTC 10517 MD • • 3 1/2"9.3#L-80 Tubing TOF 14,319' GLM 14,395' Tieback Stem 14,574' TOL 14,583' '4 I Ii 7 5/8" L-80 9565 TVD ; I 29.7# Hydril 521 14820 MD Perforations = _ 17,784'to 17,855' — — 5 1/2" L-80 12467 TVD 17# Hydril 521 18082 MD O R E S F O R E S T O I L C O R P O R A T I O N �9 ib .370 0X(Cl/;,eet • e_Jrcrle 700 cc 4ze�i,-cx e, C?S��/e..:ca.9950/ (907) ,258-8600 • (907) ?58-8601 (c_WO August 11, 2003 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501 Attn: Mr. Tom Maunder Re: Redoubt Unit#4A—Operations Shutdown Mr. Maunder, Forest Oil requests to cease operations in the Redoubt Unit #4A well on the Osprey Platform. The lower portion of a gas lift assembly is stuck in the hole just above the 5 '/2" liner top. We have been unsuccessful at fishing this out of the hole. We request moving off of the wellbore and will further evaluate our options for future use of the well. There is one interval of open perforations in the Hemlock that produced minimal or no fluid with a drawdown in excess of 3,000 psi. We do not see the need for running a kill string. If there are any questions, please contact me at 907-258-8600. Paul D. White Drilling Manager—Alaska Division Forest Oil Corporation Attachments: 10-403 Application for Sundry Approvals Schematic of RU #4A Current Configuration Date Modified:8/5/03 Date Prepared:8/1/03 rds M:\Redoubt Unit#4A\RU#4A Operations Shutdown 403.doc 1 Of 2 ORIGINAL Re: Redoubt Unit#4A Update Subject: Re:,Redoubt Unit#4A j date ~ From: Tom Maunder<tom maunder min state ak us> Date: Fn, 01 Aug 2003 14:23:20800 Some interesting points. With all the safety factors that API casing has built into it there still should have been pretty good margin. The casing wear and dogleg issues could be the culprit. Shame you all seem to be having all this opportunity for experience. Thanks for the info. Tom Rob Stinson wrote: Tom, We had to drill this sidetrack out of the 7 5/8" liner above the TOC. Unfortunately, this sidetrack wasn't anticipated when we constructed the original wellbore. When we bled off the gas lift gas and killed the well the closest we came to the collapse rating of the 7 5/8" was still a 1300 psi plus margin. The only explanation to the collapse, if that is what we have is that the drilling liner was significantly worn from drilling the 6 3/4" holes in RU #4 and RU #4A. The collapse in RU #3 happened at a collapse pressure more than 2,000 psi below the rating of the 5 1/2" liner. The only explanation there is that the collapse happened in the same place as a 5 degree dogleg in the surveys (highest in the well) . Casing stress experts have indicated that if that 5 degree dogleg happened in 30 feet or less, the resulting 15 degree+ /100' dls could have derated the casing collapse rating that severely. How that is possible, when we were able to trip through this area with stiff assemblies and run the liner with no problems is still a mystery to me. Rob Original Message From: Tom Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Friday, August 01, 2003 1:53 PM To: Rob Stinson Subject: Re: Redoubt Unit #4A Update Good luck Rob. I am curious, this is the 2nd well with collapsed liner. I know that the full length was not cemented due to the absence of hydrocarbon zones, but it would seem that the interval you are now working in should have been cemented. Do you think the TOC might have anything to do with the problems?? Just a thought. Tom Rob Stinson wrote: Tom, As per your request, I'll try to summarize what has taken place to date in the fishing activities on this well. The original intention of this flow test was to gas-lift the well and add perforation intervals as we go. We successfully tested the first interval in the Hemlock. The perf guns would not pass the lowermost gas lift mandrel to perforate the second interval. After several attempts to drift past the GLM were unsuccessful, we decided to pull the tubing out of the hole to fix the problem and allow access for additional perforating. The tubing string had excessive overpull and Q ‘..46 1 of 2 8/23/2005 10:04 AM OSPREY RU 4A 5 1/2 PRODUCTION LINER `BEST Subject. OSPREY RU 4A 5 1/2 PRODUCTION LINER TEST From _ t 4� Company Representative" <ospreycm tz starb 4-*T X03 09:42:48 0800, ilk. 7 .<10. adf a g • .'. k E JOHN CRISP: AFTER OUR DISCUSSION ON 7/5, WE TESTED THE LINER AFTER OUR FINAL SCRAPER RUN. THE PLAN FORWARD IS TO CLEAN PITS & THEN CHANGE OVER TO 5% KCL. THANX MIKE MELLO Content-Type: application/vnd.ms-excel 070703LINERTEST2.xls Content-Encoding: base64 1 of 1 8/23/2005 10:04 AM R ♦ A Redoubt Casing Schematic -July 2003 eal i :I 4, ,,# P 1 L 30" A-36 200 TVD r 150# Welded 200 MD to to i 13 3/8" L-80 2918 TVD 68# BTC 3530 MD e 7 f •*" TOL @ 5074 MD ffi "; I 9 5/8" L-80 7114 TVD ,;' 47# BTC 10517 MD 3 1/2"9.3#L-80 Tubing TOF 14,257' GLM 14,395' Tieback Stern 14,574' t1 T TOL 14,583' ii ['' „ 7 5/8" L-80 9565 TVD � - 29.7# Hydril 521 14820 MD ■ 1 Z, e s r, Perforations — 17,784'to 17,855' ic 5 1/2" L-80 12467 TVD di a 17# Hydril 521 18082 MD PSI W CA) 0, O Cn N N O 01 O 01 O O O O O O O O O O O O O O O 20:37:40 20:39:00 \'—_ � 20:40:20 �' - -�_�_ 20:41:40 20:43:00 m% " 20:44:20 c 20:45:40 m 2r 20:47:00 -0 ', ./ °' D 20:48:20 w 7) m 20:49:40 GO 20:51:00 v X 20:52:20 wo C 20:53:40 ) y 20:55:00 OzH� " �' Cn 0 D 01 20:56:20 H H H r 20:57:40 co H rn Z g 20:59:00 --1 z �c 21:00:20 � ! --i CO °' ° co m 21:01:40 CO v > 21:03:00 cn N < o i o 0 21:04:20 - 0 21:05:40 i 1 o 21:07:00 1 1 w 1 21:08:20 1 21:09:40 i m 21:11:00 p cj 21:12:20 , 0 21:13:40 m I N m G 21:15:00 � co m m 21:16:20 0 0 -o 0 cn 21:17:40 --n n co 21:19:00 N -- 0 21:20:20 t' 21:21:40 21:23:00 H 21:24:20 • lib A r En / y ) I 11 IL, FRANK H.MURKOWSKI,GOVERNOR ALASKA OIL AND GAS 333 W.7Th AVENUE,SUITE 100 CONSERVATION COMIIIISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Paul White Drilling Manager Forest Oil Corporation 310 K Street Ste 700 Anchorage AK 99501 Re: Redoubt Shoal#4A Forest Oil Corporation Permit No: 203-081 Surface Location: 1910' FSL, 314' FEL, Sec. 14,TO7N,R14W, SM Bottomhole Location: 1493' FNL, 752' FWL, Sec. 20,TO7N,R13W, SM Dear Mr. White: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED this 2- day of April 2003 cc: Department of Fish Game,Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration,Production and Refineries Section STATE OF ALASKA t = ALASKA OIL �!t GAS CONSERVATION C .. 1MISSION '' I PERMIT TO DRILL 20 AAC 25.005 1 a.Type of work Drill: Redrill: X lb.Type of well Exploratory: Stratigraphic Test: Development Oil: X Re-Entry: Deepen: Service: Developement Gas: Single Zone: Multiple Zone: 2.Name of Operator 5. Datum Elevation(DF or KB) 10.Field and Pool Forest Oil Corporation 90'MSL Redoubt Shoal Oil Field 3.Address 310 K Street,Suite 700 6.Property Designation Anchorage,Alaska 99501 381203(Surface)374002(TD) 4.Location of well at surface 7.Unit or property Name 11.Type Bond(see 20 MC 25.025) 1910'FSL,314'FEL,Section 14,TO7N R14W,SM Redoubt Unit At top of productive interval 8.Well number Type:Statewide Oil and Gas Bond 1231'FNL,664'FWL,Section 20,TO7N R13W,SM Redoubt Unit#4A RLB0001940 At total depth 9.Approximate spud date Amount: 1493'FNL,752'FWL,Section 20,TO7N R13W,SM 03-May-03 $200,000 12.Distance to nearest 13.Distance to nearest well 14. Number of acres in property 15.Proposed depth(MD and ND) property line 8,677 feet 2,759 feet(Redoubt Unit#6) 23,526 18,344'MD/12,560'TVD feet 16.To be completed for deviated wells 17.Anticipated pressure(see 20 MC 25.035(e)(2)) Kickoff depth: 200 feet Maximum hole angle: 61 Maximum surface 1,465 psig At total depth(TVD) 5,652 psig 18.Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD ND MD ND (include stage data) 6 3/4" 5 1/2" 17# L-80 Hyd 521 3,544' 14,800' 9,552' 18,344' 12,560' 876 cu ft 19.To be completed for Redrill,Re-entry,and Deepen Operations. Present To RECs ED Total al depth: measured 20,203 feet Plugs(measured) Bridge Plug 15,000 RECEIVED true vertical 13,142 feet Cement Plug from 18,775'-20,056' Effective depth: measured 15,000 feet Junk(measured) MAY 0 1 2003 true vertical 9,681 feet Alaska Oil &Gas.Cons. ommis ion Casing Length Size Cemented Measured depth rue vertical ep Structural 200' 30" Driven 200' Anchorag oo, Conductor Surface 3,530' 13 3/8" Surface 3,530' 2,918' Intermediate 10,517' 9 5/8" 4613 cu ft 10,517' 7,114' Drilling Liner 13,442' 7 5/8" 258 cu ft 18,516' 11,960' Production Liner 1,895' 5 1/2" 806 cu ft 20,203' 13,101' Perforation depth: measured 18,975'-19,125',19,226-19,275', 19,376-19,435', 19,480'-19,495', 19,625'-19,785' (3 3/8"6 spf) true vertical 12,286-12,387', 12,455'-12,489', 12,559'-12,601', 12,636-12,643', 12,736-12,848' (3 3/8"6 spf) 20.Attachments: Filing fee: X Property Plat: X BOP Sketch: X Diverter Sketch: Drilling program: X Drilling fl '. program: X Time vs.depth plot: Refraction analysis: Seabed report: 20 AAC 25.050 requirements: X 21. I herby = at the foregoing is true and correct to the best of my knowledge: Signed: - -` Irquvier. Paul White Title: Drilling Manager Date: 5 6 3 Commission Use Only Permit Number API number Approval to See cover letter Zo 3 - - &f 50- 7 3.T-.2oSQ‘-Co 1 572./o, for other requirements Conditions of approval Samples required: [ ]Yes p4 No Mud log required: [ ]Yes ,'4 No Hydrogen sulfide measures [ ]Yes ›(No Directional survey required PQ Yes [ ]No Required working pressure for BOPE [ ]2M; [X]3M; [ ]5M; [ 110M; [ ]15M 3,(2;10:.3 Vsk \" Other: y„� the order of S Approved by 0['�'-� 2 Commissioner the Commission Date: /03 Form 10-401 Rev. 12-1-85 t G t 'i �~ Submit in triplicate 1 Attachments 1. Outline Procedure 2. Well schematic 3. Unit Boundary Plat w/Proposed Well Path 4. Drilling Fluids Program 5. Pressure Information 6. Casing Design 7. Cement Calculations 8. Directional Information 9. Well Head Schematic 10. Nabors BOP schematic 11.Nabors BOP equipment list 12.Nabors Drilling Fluid System Description , ■ ' Redoubt Uri#4A Casing Plan -April 20 03 IF. i / it ia » \ A-36 200 TVD \ \ ,g# Welded 200 MD \ \ 813' L-80 2918 ND @# BTC 530 MD rt—— \ �� < mE#B7B4MD ii i i y y 0 \ : \ v. /\ :\ 2 9�8i ' weo 7114 TVD £# �c 10517 MD /ir ' . ] %. rL©&B0G MD * T 2j > 778 L80 9681 ND ) ( ■ z# Hydril 521 15000 MD { » }) \ \ ! ) � \ \ ° ) \ } ( 512 L-80 12560 ND o lid17# wyls, 18344 MD T a • 36 31 T---;11211111 33 1 1 I RDL 74 378114 2 1 1 6 5 4 I 1 1 1 H 1 t— t 11 12 7 8 9 —4. I 1— t I ADL 76 1381203 14 OSPREr 13 18 17 16 REDOUBT"BAY U 1 1__ IMMINAM■ _..o. DOUBT SN 2 RU 4 FINAL SURVEY R.Do.BT SH ?4690 I RU 6 23 2• 19 Alt i 4R PLAN 20 21 \ RU 2 RU RU 5R t 1— —— REDOUBT SH ST 22064 1 RU 3 30 1- L ' , 31 ADL 67AW 374002 FOREST OIL CORP-REDOUBT UNIT i 2 1 PROPOSED RU4R 6 4 I w i : 7 4IP Redoubt Unit #4A OUTLINE PROCEDURE 1. Set Baker Bridge Plug at+/- 15,020'. Use Collar Locator to set BP just above collar. Kick off at+/- 15,000' MD with Baker WindowMaster whipstock assembly. 3. After drilling 20' of new hole, but no more than 50', perform a Formation Integrity Test to 11.0 ppg equivalent mud weight. 4. Directionally drill 6 3/4"hole to 18,344'MD/ 12,560' TVD. 5. Run Quad Combo and CMR/ECS/SGT logs. 6. Condition hole for liner. 7. Run and cement 5 1/2" liner from 14,800' to TD. Note: Liner hanger will be set by means of dropping a ball before the cement job. The liner hanger will have a bearing section, which will allow possible rotation during the cement job. The liner packer will be mechanically set once cement is in place. The entire length of 5 '/2" liner will be cemented, with an 80' shoe track. 8. RIH with a tapered clean out assembly. 9. Clean out liner and test lap to 3000 psi. 10. Change over to 5%KC1. 11. Run USIT log across the 5 1/2" liner. 12. Run VSP logs. 13. Run Baker Retrieva DA packer on drillpipe. Set above 5 1/2" liner top. 14. Run Sclumberger LLC-3 valve on drillpipe, set in packer. 15. Run 3 1/2" ESP completion. 16. Nipple up 3 1/8"production tree. S • Redoubt Unit #4A DRILLING FLUID PROGRAM • 'FE Forest Oil Corporation Well Redoubt Unit#4 ST Osprey Platform, Cook Inlet,Alaska Displacement to oil base mud. Roll storage tanks to heat up oil mud beginning one day prior to displacement. Change out any rubber goods to diesel resistant products. Rig up catch pans, and any other necessary clean up equipment prior to displacement. Cuttings tanks etc.. should be in place to capture cuttings, etc. once displacement has begun. Run 7-5/8" casing scraper run. RIH and set retainer at +/- 15000 MD. Insure all G&I slurry storage capacity is available to handle hole volume. Once pits and lines are clean and inspected, build 75 — 100 barrel water base spacer (with seawater or drill water) in appropriate pit. Transfer oil mud from tanks to appropriate active pits. Monitor both ends of transfer to ensure no mishaps. Change shaker screens to 80 & 50 mesh for initial circulation of oil mud. Displace brine to oil base mud starting with water spacer. Rotate and reciprocate continuously during displacement. Pump at the fastest possible flow rate. Route the brine and water spacer to the G&I unit for disposal. Install magnets in shaker ditch and possum belly to catch metal cuttings. RIH and set whipstock and begin sidetrack. Change to finer shaker screens as soon as possible. Plan to put coarse screens (50 to 80 mesh) on the last shaker panels after trips to allow oil mud to warm up. rZ4cIFE , CO AM. Forest Oil Corporation IFEWell Redoubt Unit#4 ST Osprey Platform,Cook Inlet,Alaska Drilling Interval Summary 15000 - 18344' 6-3/4" Hole IFE Focus for interval Wellbore stability, minimize formation damage Drilling Fluid System Versadrill OBM; Drilling Fluid Value: $86.03 /bbl 9 Y 9 Destination of System At Re-condition and store for next well End of Interval Drilling Fluid Volumes for Volume Start: 1500 bbls Dilution Volume: 1000 bbls Volume interval End: 1500 Volume Notes— recommend dilution as .3/ft, Key Products Mapco 200, VG-69, VersaCoat, VersaWet, VersaHRP, VersaMod, Lime, CaCl2, MI Bar (Soltex for coal stability), VersaTrol Solids Control Derrick Flowline Shale Shakers, Desander, Desilter/Mud Cleaner 518 Centrifuge Waste Management MTS 14 Hammer Mill, Slurry Tank, Vacuum System, Slurry Storage Tank, Injection Pump, Shear Mill (not expected to be needed) Estimated Waste Mud Volume 1000 bbls; Cuttings/Sludge Volume > 150 bbls. Volumes Available Waste Shaker Tank = 80 bbls Eliminator Tank = 100 bbls Storage Slurry Storage Tank = 150 bbls Vacuum Slurry Tank = 50 bbls Upright Storage Tank = 500 bbls Estimated Properties of 9.5 – 11.0 PPG Disposed Waste > 50 - < 70 Funnel Viscosity 10 –20% Drill Solids Operational Issues Excessive sliding, minimal circulation –follow drilling practices developed on RU #4, circulate until shakers cleanup prior to trips Potential Problems Hole Cleaning, hole stability (sloughing coal), differential sticking r _=4PN IFE V` CO O a APIA Forest Oil Corporation Well Redoubt Unit#4 ST - Osprey Platform, Cook Inlet, Alaska Drilling Interval Summary Interval Key Performance Indicators Depth Mud Low CaCl2 HTHP Low Dilution Interval Weight Gravity Concentr Fluid Loss Shear Rates Volume Solids ation (ft) (ppg) (%) (%) (m1/30 min) (6 & 3 RPM) (bbls) 15000 - 18700 ' 9.8+ 6 - 8 +/- 25 < 4 - 6 15 -& 12 1000 Drilling Fluid Formula Input I Description RU #4 Sidetrack Interval Mud W eight 9.8 Salt % Purity 95 W eight Material SG 4.2 Salt Price 0.568 W eight Material Price 0.1181 Oil Ratio 80 SG Base (Oil) Fluid 0.88 Oil Price 1 .45 Salt CaCl2 Salt % W eight 25 Output - 1 bbl I # Products Concentration Volume Cost Field, lb Lab, gm Field, bbl Lab, ml 1 bbl 1 Oil 216.22_ 216.22 0.702 245.71 42.75 2 CACL2 21.55 21.55 0.018 6.21 12.24 3 VERSACOAT 5.00 5.00 0.015 5.17 6.52 4 VERSAMOD 1.00 1.00 0.003 1.02 1.51 5 VG-69 6.00 6.00 0.011 3.82 7.72 6 LIME 2.00 2.00 0.003 1.00 0.68 7 VERSAW ET 2.00 2.00 0.006 2.20 2.01 8 VERSATROL 4.00 4.00 0.006 2.26 2.80 9 Water 60.35 60.35 0.172 60.35 10 W eight Material 93.47 93.47 0.064 22.26 11.04 Total I 411 .6 411.6 1.0001 3501 87.27 Calculated Mud Weight 9.800 c IFE M, Forest Oil Corporation 'FE Well Redoubt Unit#4 ST Osprey Platform, Cook Inlet,Alaska IFE Drilling Interval Discussion 15000 - 18344' (MD) 5-1/2" Casing • ROP, GPM • Estimated ROP for this interval is 40 - 80 ft/hr. • Estimated flowrate for this interval is 300 — 350 GPM. • Use Virtual Hydraulics models as a guideline for flowrates and hole cleaning. • Lost Circulation • Seepage losses may be controlled with moderate additions of Safecarb and/or G-Seal. • For severe losses, pace 20 bbls oil mud in slugging pit. Add blend of lost circulation material. Spot across theft zone. SafeCarb Medium 10 PPB SafeCarb Fine 10 PPB G-Seal 10 PPB • Coal Beds • Sloughing/running coal should be treated by adding 4 - 6 ppb Soltex to the mud system depending on the severity of the problem. NOTE: Soltex additions can reduce the rheology of the mud. Be prepared to add rheology modifiers (IMG 400, VersaMod, VersaHRP), as needed to maintain proper rheology. • For severe coal sloughing, a concentrated pill consisting of 15 — 20 ppb Soltex may be p 9 pp spotted across the coal bed prior to POOH for a trip. A slight amount of pressure (equal to the annular pressure loss) may be applied to the pill to squeeze it into the coal bed. • Swab/Surge Pressures • Care should be taken while running in the hole and breaking circulation after an extended period of time out of the hole. Bringing up the pump rates too rapidly while the drilling fluid is cold may cause excessive annular pressure loss on the formation. While running in the hole after trips, circulation should be broken at least once at the casing shoe. At T.D. the pumps should be brought up slowly in order to allow the fluid to heat up prior to reaching normal flowrates. • Casing running fluid properties • The mud should be conditioned prior to POOH to run liner. Moderate or reduce yield point and progressive gel strengths with additions of base oil in order to reduce surge pressure while running casing. NOTE: See recommended liner running speed for this interval in Virtual Hydraulics. MA LIFE 0 0 Al Il► Forest Oil Corporation 'IFE Well Redoubt Unit#4 ST Osprey Platform, Cook Inlet,Alaska Completion Interval Summary PBTD IFE Focus for interval Good displacement, minimize waste generation, Completion Fluid KCL Brine 5%: Fluid Value: $7.12/bbl Destination of System Injection in disposal well At End of Interval Completion Fluid Brine 1600 bbls Seawater 1100 bbls; Spacers 230 bbls Volumes for interval Volume End 0 bbls Key Products Mapco 200, KCI, Kleen-Up, Safe Surf, Safe Solv, Citric Acid, HEC, Conqor 303 Filtration Equipment 10 micron pod filters (two filters) Waste Management MTS 14 Hammer Mill, Slurry Tank, Vacuum System, Slurry Storage Tank, Injection Pump Estimated Waste Spacers 200 + bbls; Seawater 1100 bbls; KCI Brine 1600 bbls Volumes Pit Rinse +/- 1000 bbls Available Waste Shaker Tank = 80 bbls Eliminator Tank = 100 bbls Storage Slurry Storage Tank = 150 bbls Vacuum Slurry Tank = 50 bbls Upright Storage Tank = 500 bbls Estimated Properties of 9.5 — 11.0 PPG Disposed Waste 45 — 50 Funnel Viscosity 2 - 6% Drill Solids Operational Issues Displacement Rate > 8 BPM, Continuous Displacement without Stoppage, Transferring large amounts of fluids Potential Problems Poor Displacement, Spills r a., iF ' CO 1 . . • .0 'FE Forest Oil Corporation Well Redoubt Unit#4 ST Osprey Platform, Cook Inlet,Alaska Recommended Displacement Procedure 1. After the 5-1/2" liner is run and cemented, the surface mud volume should be aggressively centrifuged in order to remove as many drill solids as possible prior to being placed in storage. 2. At T.D. of the cleanout run of the 5-1/2" liner, the mud system should be circulated and centrifuged as much as possible. 3. At this point, the surface volume should be sent to the upright tanks. The oil base spacer may be reversed into the annulus in order to provide pit room for other pills. 4. All G & I slurry storage should be empty at this time in order to provide maximum capacity for pills and seawater. 5. The pits and all surface lines should be vacuumed of solids and thoroughly cleaned at this time. 6. The pits should be filled with seawater and all the spacers mixed in the appropriate pits. 7. Begin reversing the pills down the wellbore and follow the pills with seawater. 8. Take all oil mud returns to the two upright tanks designated for storage. The oil base spacer may be incorporated into the oil mud. 9. Divert all spacers to the G & I operation for disposal. 10. Continue pumping seawater until the wellbore cleans up. 11. After it is determined the wellbore is sufficiently clean, empty the surface pits and build 5% KCI brine. Displace the seawater in the wellbore with clean 5% KCI brine. Use a 40-barrel HEC pill between the seawater and KCI brine. 12. Filter the KCI brine as needed through 10-micron pod filters until acceptable turbidity readings are reached. - E 0 • Forest Oil Corporation IFE— Well Redoubt Unit#4 ST Osprey Platform, Cook Inlet, Alaska Recommended Displacement Procedure Lim Volumes: Drill String Vol:DP1 225.19 bbl's DP2 54,05 bbl's No Pipe DP3 2229 bbl's Csg.Annular Vol:Csg.X 5.5'DP 444,96 bbl's 757.99 • DP1 5.50 x 4.778 x 10150 ft Csg.X 4"DP 6.65 bbl's 167.24 Liner x4"DP 98.35 bbl's 70.19 7-5/8" Liner x 2.875 DP 45.15 5-1/7' Liner x 2.875 DP 34.99 Total Hole Vol Ell 995.42 _ TOL 10350 ND Total Annular Vol. 632.11 bbrs Total Drill String Vol. 301.53 bbl's — 1111 DP2 4.00 x 3.44 x 4700 ft Total Hole Vol. 933.64 bbl's Calc.Strokes: Surf to Eft: 3599 Total Stks: 11143 . 9.625 x 8.681 @ 10500 ft MD Rirp Output 0.08379 Bit to Surf: 7544 Spacer Make Up: ® Spacer 1 a!base 30-35 bbrs 30-35b131'sofNbpoo200 Spacer 2 Seawater 40 bbl's 40 bbl's seawater v■r4 ppb Citric Acid(3 1 Willi sacks) • Spacer 3 Seawater 40 bbl's A ♦ 7.625 x 6.184 @ 15000 ft ND 40 bbl's seawater vW2 drum IGdc Off Part Sate&lv Spacer 4 Seawater 40 bbl's 40 bbl's seawater va/2 chrrs 2.875 x 2441 x 3850 Safe Surf Spacer 5 Seawater 40 bbl's seawrater w/1 chin weer-Up Spacer 6 Seauaeter 40 bbl's 40 bbl's seawater w/5 ppb EEC (6 sacks)Lower ph H/Citric Acid;add add FEC;raise pH IA/Caustic Sada;add DefoanX it needed A r , 4- 5.5 x 4.276 @ 18344 ft ND All pits 3&4 with seawater and reverse circulate sweeps rzj elm m' co • • REDOUBT UNIT #5A PRESSURE INFORMATION The following presents data used for calculation of anticipated surface pressures (ASP) during drilling of the Redoubt Unit#1 and Redoubt Unit#2. Redoubt Shoal State 29690-1, P=5309 psi @ 12,070' TVD from DST#2 (as per 407 Comp Report, 1/9/68) EMW= 8.46 ppg Gradient= 0.440 psi/ft Redoubt Shoal State 29690-2, P=5249 psi @ 12,202' TVD from DST#1(as per 407 Comp Report, 10/15/68)EMW= 8.27 ppg Gradient=0.430 psi/ft Redoubt Bay Unit#1, P=4800 psi @ 10,953' TVD from DST(as per monthly drilling report , 12/13/76)EMW= 8.43 ppg Gradient= 0.438 psi/ft The most conservative (highest) formation pressure gradient of 8.65 ppg or .45 psi/ft was used in these calculations. Procedure for Calculating Anticipated Surface Pressure ASP is determined as the lesser of 1) surface pressure at breakdown of the formation at the casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point and a 1/3 gas gradient plus a 2/3 saltwater gradient to the surface. We have chosen this method based on no sign of gas in the Redoubt Unit#1 and Redoubt Unit#2. 1)ASP =((FG x .052) - 0.10)x D where: ASP=Anticipated Surface Pressure in psi FG=Fracture Gradient at the casing seat in lb/gal 0.052 = Conversion from lb/gal to psi/ft 0.10 =gas gradient in psi/ft D =true vertical Depth of casing seat in ft RKB OR 2) ASP= FPP-( 1/3 x 0.10 x D)—(2/3 x .45 x D) where: FPP =Formation Pore Pressure at the next casing point which is tied back to surface or at TD (total depth) ASP Calculations Drilling below Drilling Liner(7-5/8") ASP = ((FG x .052)- 0.10)x D =((11.0x .052) - 0.10)x9681' =4569 psi OR ASP =(12560'x .45) - (1/3 x .10 x 12560')—(2/3 x .45 x 12560') = 1465 psi S REDOUBT UNIT #4A CASING DESIGN Settin Depth Size Specifications Top Bottom Hole Casing Weight Grade Coupling Length MD TVD MD TVD 6'/1' 5'/2" 17# L-80 Hydril 521 3,544' 14,800' 9,552' 18,344' 12,560' Casing Joint Strength Body Strength Burst Collapse K lbs K lbs Psi Psi 5 1/2"17#L-80 Hydril 521 338 397 7740 6290 Design Criteria Tension Straight Hook Load—Ignoring Deviation and Buoyancy Burst Full Column of Gas against deepest formation pressure Except for liners where a 3000 psi test pressure on top of 9.6 ppg fluid is backed on the outside by a fresh water gradient of 0.43 psi/ft. Collapse Full evacuation on the inside backed by expected formation gradient of .45 psi/ft. on the outside. 5 '/2" Production Liner Tension = 3544' x 17# Rated= 338 K =60.2 K Safety Factor= 5.6 Burst = ((12560 x .4992)+3000)-(12560 x Rated= 7740 psi .43) Safety Factor=2.0 = 3869 psi Collapse =(12560' x .45)—(.10 x 12560') Rated=6290 psi =4396 psi Safety Factor= 1.4 • S REDOUBT UNIT #4A CEMENTING PROGRAM Operator Name: Forest Oil Corp Well'Name: REDOUBT UNIT 4W • Job Description: 5-1/2"Production Liner Date: April 30, 2003 Proposal No: 100178748A JOB AT A GLANCE Depth (TVD) 12,580 ft Depth (MD) 18,344 ft Hole Size 6.75 in Liner Size/Weight : 5 1/2 in, 17 lbs/ft Pump Via Drill Pipe 4"O.D. (3.244" .I.D) 15.3 Casing 5 1/2"O.D. (4.892" .I.D) 17 Total Mix Water Required 3,712 gals Pre-Flush Water+ 1 gpb MCS-AG 20 bbls Density 8.4 ppg Weighted Spacer MCS-4D 30 bbls Density 10.5 ppg Cement Slurry Class G Cement 740 sacks Density 15.7 ppg Yield 1.18 cf/sack Displacement Drilling Mud 233 bbls Density 9.6 ppg 0r4109 Report Prinked on April 30,2003 4:05 PM Page 1 Operator Name: Forest Oil Corp ` Well Name: REDOUBT UNIT 4L� • . qi Job Description: 5-1/2" Production Liner Date: April 30,2003 Proposal No: 100178748A WELL DATA ANNULAR GEOMETRY ANNULAR I.D. I DEPTH(ft) (in) MEASURED I TRUE VERTICAL 6.875 CASING I 15,000 I 9,681 6.750 HOLE I 18,344 I 12,580 SUSPENDED PIPES DIAMETER (in) I WEIGHT I DEPTH(ft) O p I.D. (Ibs/ft) MEASURED I TRUE VERTICAL 5.500 I 4.892 I 17 18,344 I 12,580 Drill Pipe 4.0 (in) OD, 3.244(in) 14,700 ft ID, 15.3(Ibs/ft)set @ Drill Pipe 5.5(in) OD, 4.892(in) 18,264 ft ID, 17(Ibs/ft)set @ Depth to Top of Liner 14,700 ft Float Collar set @ 18,264 ft Mud Density 9.60 ppg Mud Type Oil Based Est. Static Temp. 188 ° F Est. Circ.Temp. 150 ° F VOLUME CALCULATIONS 300 ft x 0.0928 cf/ft with 0% excess = 28 cf 3,344 ft x 0.0835 cf/ft with 200% excess = 838 cf 80 ft x 0.1305 cf/ft with 0%excess = 10 cf(inside pipe) TOTAL SLURRY VOLUME = 876 cf = 156 bbls 0r4117 Report Rented on:April 30,2003 4:06 PM Page 2 Operator Name: Forest Oil Corp Welllame: REDOUBT UNIT 44 • Job Description: 5-1/2" Production Liner Date: April 30, 2003 Proposal No: 100178748A FLUID SPECIFICATIONS Pre-Flush Weighted Spacer 30.0 bbls MCS-4D +6 Ibs/bbl MCS-D +22.61 lbs/bbl Bentonite +90 Ibs/bbl Barite, Bulk @ 10.5 ppg VOLUME VOLUME FLUID CU-FT FACTOR AMOUNT AND TYPE OF CEMENT Cement Slurry 876 I 1.18 = 740 sacks Class G Cement+0.55% bwoc R-3 + 2% bwow Potassium Chloride + 0.6% bwoc CD- 32 +0.2% bwoc FL-33 + 1 gals/100 sack FP-6L +0.2% bwoc Sodium Metasilicate +0.9% bwoc BA-10A+44.5% Fresh Water Displacement 233.1 bbls Drilling Mud @ 9.6 ppg CEMENT PROPERTIES SLURRY NO. 1 Slurry Weight(ppg) 15.70 Slurry Yield (cf/sack) 1.18 Amount of Mix Water(gps) 5.02 Amount of Mix Fluid (gps) 5.03 Estimated Pumping Time- 70 BC (HH:MM) 7:46 Estimated Pumping Time- 100 BC (HH:MM) 7:50 Free Water(mis) @ 155 ° F @ 90 ° angle 0.0 Fluid Loss (cc/30min) at 1000 psi and 155 ° F 38.0 COMPRESSIVE STRENGTH 22.5 hrs @ 190 ° F (psi) 500 24 hrs @ 190 ° F (psi) 1250 48 hrs @ 190 ° F (psi) 3329 Pilot tests will be preformed prior to loading. Slight additvie adjustments should be expected to achieve the desired slurry properties based on pilot test results. Gr4129 Report Pnrded on April 30;2003 4:06 PM Page 3 Operator Name: Forest Oil Corp • Well Name: REDOUBT UNIT 40 j4 Date: April 30, 2003 Proposal No: 100178748A PRODUCT DESCRIPTIONS BA-10A Improves cement bonding and acts as a matrix flow control agent. BA-10A is effective in a wide variety of slurries. Barite, Bulk A naturally occuring mineral (Barium Sulfate). It is widely used as a weighting material in cement spacers Y 9 � and occasionally in cement slurries. It can yield a slurry density in excess of 19 lbs/gal. Bentonite Commonly called gel, it is a clay material used as a cement extender and to control excessive free water. CD-32 A patented,free-flowing, water soluble polymer that is an efficient and effective dispersant for primary and remedial cementing. Class G Cement Intended for use as a basic cement from surface to 8000 ft as manufactured, or can be used with accelerators and retarders to cover a wide range of well depths and temperatures. FL-33 A patented cement fluid loss additive that provides exceptional fluid loss control across a wide range of temperatures, salinity conditions, and remedial cementing applications at low to high temperature ranges. FP-6L A clear liquid that decreases foaming in slurries during mixing. MCS-4 A turbulent flow spacer system that prevents water and oil-base mud and cement contamination and water-wets the casing to increase bonding. MCS-AG A surfactant used in cement spacer systems to prevent mud incompatability and improve bonding. Potassium Chloride A granular salt used to reduce clay swelling caused by water-base stimulation fluids. R-3 A low temperature retarder used in a wide range of slurry formulations to extend the slurry thickening Sodium Metasilicate An extender used to produce an economical, low density cement slurry. Gr4163 Report p 30,2003 4 on Page 6 AprSl 30,2603 4:06 PM REDOUBT UNIT #4A DIRECTIONAL PROGRAM 5rrny-Sun Alaska prey DrillQuest 1JRILLIf+�t+ SERVICES Cook Inlet #4A WP02 Haliburton Company RU#4A WP02 Proposal Data Vertical Origin: Well Horizontal Origin: Well Measurement Units: ft North Reference: Grid North Grid North Convergence: -1.457° Dogleg severity: Degrees per 100 feet(US Survey) Vertical Section Azimuth: 108.930° Vertical Section DescriptionWell Vertical Section Origin: 0.00 N,0.00 E Coordinate System: NAD27 Alaska State Planes,Zone 4 Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 15000.00 51.060 95.590 9680.88 2352.75 S 10551.35 E 10743.95 15020.00 51.309 98.654 9693.42 2354.68 S 10566.81 E 10759.20 12.000 15911.37 27.563 162.668 10403.29 2617.27 S 10993.91 E 11248.39 5.000 17746.35 27.563 162.668 12030.00 3427.80 S 11246.86 E 11750.60 0.000 18344.20 27.563 162.668 12560.00 3691.88 S 11329.27 E 11914.23 0.000 9300 - 4ft 111E°0000 Begin 6-3/4"Hole ST Exit:Dir @ 12.000°/100ft,85.00°Right TF:15000.00f MD,9680.88ft TVD 9900 -7 5/8in Casing Begin Dir @ 5.000°1100ft:15020.00ft MD,9693.428 TVD 15000.00ft MD •ma) 9680.88ft TVD End Dir,Start Sail©27.563°:15911.37ftMD,10403.29ftTVD ,15800.00 6100.00 Current Well Properties 10500 - Well: Redoubt Unit 4A WP02 6200.00 .0300.00 Horizontal Coordinates: Ref.Global Coordinates: 2449937.80 N,200633.14 E Ref.Structure: 1673.20 S,2250977.86 W Ref.Geographical Coordinates: 60°41'43.7122"N,151°40'14.3890"W 690000 RKB Elevation: 90.00ft above Mean Sea Level 6600.00 90.00ft above Structure O. Grid North Convergence: -1.457° N 111 OO 730000 North Reference: Grid North _ Units: Feet(US Survey) To U 17000 00 L 770000 8100 011 11700 - RU#4A T1 ,17400.00 12030.00ft TVD 3427.80 S.11246.86 E 780000 0900.00 12300 - 73, t1az00.o0 9300.00 O ° O Co • L5 1/2in Liner Total Depth:18344.208 MD,12560.00f ND G$ U 18344.20ft MD C 12560.00ft TVD r 12900 - m U l l l l l l 10800 11400 12000 12600 13200 13800 Scale: 1 inch =600ft Section Azimuth: 108.930°(Grid North) Vertical Section (Well) DrillQuest 3.03.02.005 sp ''y-sun Alaska prey DrillQuest 'ORI1_L11tG SERVICES Cook Inlet • #4A WP02 .Malwtarton C°mP.0V RU#4A WP02 Target Data Measurement Units: ft Target Coordinate TVD Northings Eastings SSTVD Northings Eastings Target Name Point Type Well Well Well MSL ASP Y ASP X Shape (ft) (ft) (ft) (ft) (ft) (ft) RU#4A T1 Entry Point 12030.00 3427.80 S 11246.86 E 11940.00 2446510.00 N 211880.00 E Point Ph RU#4A WP02 Proposal Data v Vertical Origin: Well Horizontal Origin: Well Measurement Units: ft North Reference: Grid North Grid North Convergence: -1.457° Dogleg severity: Degrees per 100 feet(US Survey) Vertical Section Azimuth: 108.930° Vertical Section Description:Well Vertical Section Origin: 0.00 N,0.00 E Coordinate System: NAD27 Alaska State Planes,Zone 4 Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 15000.00 51.060 95.590 9680.88 2352.75 S 10551.35E 10743.95 15020.00 51.309 98.654 9693.42 2354.68 S 10566.81 E 10759.20 12.000 15911.37 27.563 162.668 10403.29 2617.27 S 10993.91E 11248.39 5.000 17746.35 27.563 162.668 12030.00 3427.80 S 11246.86E 11750.60 0.000 -2200 - 18344.20 27.563 162.668 12560.00 3691.88 S 11329.27 E 11914.23 0.000 _.700.00 7 5/8in Casing 1 .' ' .00 15000.00ft MD 9680.88ft ND ...6-314"Hole _ - °U0° -- . RU#4 10200.00 ST Exit:Dir @ 12.000°/100ft,85.00°Right TF:15000.00ft MD,9680.88ft TVD Begin Dir @ 5.000°/100ft:15020.00ft MD,9693.42ft TVD -2600 - End Dir,Start Sail @ 27.563°:15911.37ftMD,10403.29ftTVD 0600 00 Current Well Properties Well: Redoubt Unit#4A WP02 110000. Horizontal Coordinates: Ref.Global Coordinates: 2449937.80 N,200633.14 E Ref.Structure: 1673.20 S,2250977.86 W to -3000 - Ref.Geographical Coordinates: 60°41'43.7122"N,151°40'14.3890"W t) O RKB Elevation: 90.00ft above Mean Sea Level 1100000 90.00ft above Structure �, Grid North Convergence: -1.457° to O North Z Un is Reference: Feet(US Survey) 180000 -3400 - P` 112200.00 Y RU•-A TI 12030.00ft TVD o 3427.80 S,11246.86 E 5 1/2in Liner 1` 18344.2 ry D M 12560.00ftND -3800 - Total Depth:18344.20ftMD,12560.00ftTVD O O I L U C 0) cc0) -4200 - I I I I I I I 10000 10400 10800 11200 11600 12000 12400 Scale: 1 inch=400ft Eastings(Well) Reference is Grid North DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Proposal Report for Plan:Redoubt Unit#4A • Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) RU#4 Reca 0.00 0.000 0.000 -90.00 0.00 0.00 N 0.00 E 2449937.80 N 200633.14 E 0.00 100.00 0.000 0.000 10.00 100.00 0.00 N 0.00 E 2449937.80 N 200633.14 E 0.000 0.00 200.00 0.411 67.669 110.00 200.00 0.16 N 0.16E 2449937.96 N 200633.30E 0.411 0.10 300.00 1.460 93.400 209.99 299.99 0.22 N 1.76 E 2449938.02 N 200634.90 E 1.104 1.59 • 400.00 3.260 86.380 309.90 399.90 0.33 N 5.87E 2449938.13 N 200639.01 E 1.820 5.45 500.00 4.780 76.960 409.65 499.65 1.45 N 12.77E 2449939.25 N 200645.91 E 1.652 11.61 600.00 5.810 74.930 509.22 599.22 3.70 N 21.71 E 2449941.50 N 200654.85E 1.047 19.34 700.00 6.680 80.210 608.63 698.63 6.01 N 32.33E 2449943.81 N 200665.47E 1.042 28.64 800.00 7.540 88.850 707.86 797.86 7.13 N 44.63 E 2449944.93 N 200677.77 E 1.370 39.90 900.00 8.660 95.930 806.86 896.86 6.48 N 58.67 E 2449944.28 N 200691.81 E 1.498 53.40 1000.00 10.070 98.480 905.53 995.53 4.41 N 74.81 E 2449942.21 N 200707.95 E 1.469 69.33 1100.00 11.760 100.850 1003.72 1093.72 1.21 N 93.47E 2449939.01 N 200726.61 E 1.748 88.02 1200.00 13.360 102.020 1101.32 1191.32 3.12 S 114.78E 2449934.68 N 200747.92E 1.620 109.58 1300.00 15.290 103.450 1198.21 1288.21 8.59 S 138.90E 2449929.21 N 200772.04E 1.962 134.18 1400.00 17.190 104.900 1294.21 1384.21 15.46 S 166.01 E 2449922.34 N 200799.15E 1.943 162.05 1500.00 19.180 105.790 1389.21 1479.21 23.73 S 196.10 E 2449914.07 N 200829.24 E 2.009 193.19 1600.00 21.810 105.410 1482.88 1572.88 33.14 S 229.82E 2449904.66 N 200862.96E 2.633 228.14 1700.00 24.570 104.270 1574.79 1664.79 43.20 S 267.89 E 2449894.60 N 200901.03 E 2.796 267.41 1800.00 27.960 102.600 1664.45 1754.45 53.44 S 310.93E 2449884.36 N 200944.07E 3.469 311.45 1900.00 31.210 102.470 1751.40 1841.40 64.15 S 359.12E 2449873.65 N 200992.26E 3.251 360.50 2000.00 35.330 102.300 1834.99 1924.99 75.91 S 412.69E 2449861.89 N 201045.83E 4.121 414.99 • 2100.00 39.060 100.630 1914.64 2004.64 87.89 S 471.93E 2449849.91 N 201105.07 E 3.864 474.91 2200.00 42.820 101.230 1990.17 2080.17 100.32 S 536.25E 2449837.48 N 201169.39E 3.780 539.79 2300.00 45.760 102.100 2061.74 2151.74 114.45 S 604.62E 2449823.35 N 201237.76E 3.002 609.05 2400.00 47.900 101.900 2130.15 2220.15 129.61 S 675.96E 2449808.19 N 201309.10E 2.145 681.45 2500.00 50.930 100.800 2195.20 2285.20 144.54 S 750.41 E 2449793.26 N 201383.55 E 3.143 756.72 2600.00 53.900 99.930 2256.19 2346.19 158.79 5 828.35E 2449779.01 N 201461.49E 3.049 835.07 2700.00 52.010 100.140 2316.43 2406.43 172.69 S 906.95E 2449765.11 N 201540.09E 1.897 913.92 2800.00 51.170 100.320 2378.56 2468.56 186.61 S 984.06E 2449751.19 N 201617.20E 0.852 991.37 2900.00 51.920 100.420 2440.75 2530.75 200.70 S 1061.09 E 2449737.10 N 201694.23 E 0.754 1068.81 30 April,2003-9:48 Page 2 of 8 DriliQuest 3.03.02.005 I. Sperry-Sun Drilling Services Proposal Report for Plan:Redoubt Unit#4A Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°l100ft) 3000.00 51.540 100.760 2502.69 2592.69 215.13 S 1138.26 E 2449722.67 N 201771.40 E 0.464 1146.49 3100.00 51.940 101.360 2564.61 2654.61 230.20 S 1215.32E 2449707.60 N 201848.46E 0.618 1224.27 3200.00 50.930 102.030 2626.95 2716.95 246.04 S 1291.89E 2449691.76 N 201925.03E 1.138 1301.84 3300.00 52.880 102.190 2688.64 2778.64 262.55 S 1368.83 E 2449675.25 N 202001.97 E 1.954 1379.97 3400.00 53.380 102.140 2748.64 2838.64 279.41 S 1447.04 E 2449658.39 N 202080.18 E 0.502 1459.42 3500.00 51.560 102.100 2809.56 2899.56 296.06 S 1524.57 E 2449641.74 N 202157.71 E 1.820 1538.16 III 3600.00 47.960 102.380 2874.15 2964.15 312.24 S 1599.16 E 2449625.56 N 202232.30 E 3.606 1613.96 3700.00 45.140 102.750 2942.91 3032.91 328.02 S 1670.01 E 2449609.78 N 202303.15 E 2.833 1686.10 3800.00 46.460 101.260 3012.63 3102.63 342.92 S 1740.13 E 2449594.88 N 202373.27 E 1.698 1757.26 3900.00 47.450 100.640 3080.89 3170.89 356.80 S 1811.88 E 2449581.00 N 202445.02 E 1.089 1829.63 4000.00 50.660 101.740 3146.41 3236.41 371.47 S 1885.96E 2449566.33 N 202519.10E 3.316 1904.47 4100.00 53.260 102.670 3208.03 3298.03 388.13 S 1962.93 E 2449549.67 N 202596.07 E 2.701 1982.68 4200.00 53.550 103.030 3267.65 3357.65 405.99 S 2041.20 E 2449531.81 N 202674.34 E 0.409 2062.52 4300.00 54.470 102.930 3326.41 3416.41 424.16 S 2120.05E 2449513.64 N 202753.19E 0.924 2142.99 4400.00 55.820 102.140 3383.56 3473.56 441.97 S 2200.15 E 2449495.83 N 202833.29 E 1.498 2224.54 4500.00 56.430 101.980 3439.30 3529.30 459.31 S 2281.34 E 2449478.49 N 202914.48 E 0.624 2306.97 4600.00 57.240 101.940 3494.00 3584.00 476.66 S 2363.24 E 2449461.14 N 202996.38 E 0.811 2390.06 4700.00 56.870 101.150 3548.39 3638.39 493.46 S 2445.46 E 2449444.34 N 203078.60 E 0.759 2473.28 4800.00 57.040 100.810 3602.91 3692.91 509.42 S 2527.74 E 2449428.38 N 203160.88 E 0.332 2556.30 4900.00 56.670 101.700 3657.59 3747.59 525.76 S 2609.86 E 2449412.04 N 203243.00 E 0.832 2639.27 5000.00 54.910 103.540 3713.82 3803.82 543.82 S 2690.56 E 2449393.98 N 203323.70 E 2.326 2721.46 5100.00 53.970 104.760 3771.97 3861.97 563.70 S 2769.44 E 2449374.10 N 203402.58 E 1.367 2802.52 5200.00 54.000 104.780 3830.77 3920.77 584.32 S 2847.65 E 2449353.48 N 203480.79 E 0.034 2883.20 5300.00 54.590 105.140 3889.13 3979.13 605.28 S 2926.10 E 2449332.52 N 203559.24 E 0.658 2964.21 III 5400.00 55.110 105.030 3946.70 4036.70 626.56 S 3005.05 E 2449311.24 N 203638.19 E 0.528 3045.79 5500.00 55.160 105.360 4003.87 4093.87 648.07 S 3084.23 E 2449289.73 N 203717.37 E 0.275 3127.66 5600.00 55.510 105.660 4060.75 4150.75 670.06 S 3163.48 E 2449267.74 N 203796.62 E 0.428 3209.76 5700.00 54.060 104.520 4118.41 4208.41 691.34 S 3242.36 E 2449246.46 N 203875.50 E 1.723 3291.28 5800.00 53.880 104.070 4177.23 4267.23 711.30 S 3320.73 E 2449226.50 N 203953.87 E 0.406 3371.88 5900.00 52.830 103.160 4236.92 4326.92 730.19 S 3398.70 E 2449207.61 N 204031.84 E 1.279 3451.77 6000.00 53.030 103.040 4297.20 4387.20 748.28 S 3476.42 E 2449189.52 N 204109.56 E 0.222 3531.15 6100.00 53.350 102.770 4357.11 4447.11 766.16 S 3554.46E 2449171.64 N 204187.60E 0.386 3610.77 6200.00 53.880 102.810 4416.43 4506.43 783.98 S 3632.96 E 2449153.82 N 204266.10 E 0.531 3690.81 6300.00 54.430 102.720 4474.99 4564.99 801.89 S 3712.02 E 2449135.91 N 204345.16 E 0.555 3771.40 6400.00 55.030 102.590 4532.74 4622.74 819.78 S 3791.68E 2449118.02 N 204424.82E 0.609 3852.56 30 April,2003-9:48 Page 3 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Proposal Report for Plan:Redoubt Unit#4A - Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°1100ft) 6500.00 55.500 102.390 4589.71 4679.71 837.55 S 3871.91 E 2449100.25 N 204505.05 E 0.498 3934.22 6600.00 53.670 102.240 4647.66 4737.66 854.93 S 3951.53 E 2449082.87 N 204584.67 E 1.834 4015.17 6700.00 52.680 102.180 4707.60 4797.60 871.86 S 4029.77 E 2449065.94 N 204662.91 E 0.991 4094.66 6800.00 52.730 102.200 4768.19 4858.19 888.66 S 4107.53 E 2449049.14 N 204740.67 E 0.052 4173.67 6900.00 53.790 102.370 4828.01 4918.01 905.71 S 4185.83 E 2449032.09 N 204818.97 E 1.069 4253.26 7000.00 53.370 102.360 4887.38 4977.38 922.94 S 4264.43 E 2449014.86 N 204897.57 E 0.420 4333.20 7100.00 51.980 102.470 4948.01 5038.01 940.04 S 4342.09 E 2448997.76 N 204975.23 E 1.393 4412.21 7200.00 52.450 102.720 5009.28 5099.28 957.27 S 4419.22 E 2448980.53 N 205052.36 E 0.510 4490.76 7300.00 52.460 102.630 5070.22 5160.22 974.67 S 4496.57 E 2448963.13 N 205129.71 E 0.072 4569.57 7400.00 52.140 101.920 5131.37 5221.37 991.49 S 4573.88E 2448946.31 N 205207.02E 0.647 4648.16 7500.00 51.820 100.660 5192.97 5282.97 1006.92 S 4651.14 E 2448930.88 N 205284.28 E 1.043 4726.24 7600.00 51.520 100.110 5254.98 5344.98 1021.06 S 4728.30 E 2448916.74 N 205361.44 E 0.525 4803.81 7700.00 50.960 100.040 5317.59 5407.59 1034.70 S 4805.07 E 2448903.10 N 205438.21 E 0.563 4880.86 7800.00 49.490 100.180 5381.57 5471.57 1048.19 S 4880.73 E 2448889.61 N 205513.87 E 1.474 4956.81 7900.00 48.420 100.360 5447.23 5537.23 1061.63 S 4954.94 E 2448876.17 N 205588.08 E 1.079 5031.36 8000.00 48.230 100.530 5513.72 5603.72 1075.18 S 5028.40 E 2448862.62 N 205661.54 E 0.229 5105.24 8100.00 47.840 100.400 5580.59 5670.59 1088.68 S 5101.52 E 2448849.12 N 205734.66 E 0.402 5178.79 8200.00 47.870 100.260 5647.69 5737.69 1101.98 S 5174.46 E 2448835.82 N 205807.60 E 0.108 5252.10 8300.00 47.760 100.220 5714.84 5804.84 1115.15 S 5247.38 E 2448822.65 N 205880.52 E 0.114 5325.34 8400.00 48.080 100.220 5781.86 5871.86 1128.32 S 5320.42 E 2448809.48 N 205953.56 E 0.320 5398.71 8500.00 49.390 99.830 5847.81 5937.81 1141.40 S 5394.44 E 2448796.40 N 206027.58 E 1.342 5472.97 8600.00 49.700 99.710 5912.70 6002.70 1154.31 S 5469.43 E 2448783.49 N 206102.57 E 0.323 5548.09 8700.00 50.550 99.960 5976.81 6066.81 1167.42 S 5545.04 E 2448770.38 N 206178.18 E 0.871 5623.87 8800.00 51.510 100.300 6039.70 6129.70 1181.10 S 5621.57E 2448756.70 N 206254.71 E 0.996 5700.70 • 8900.00 53.270 100.210 6100.72 6190.72 1195.20 S 5699.52E 2448742.60 N 206332.66E 1.761 5779.01 9000.00 54.180 100.120 6159.89 6249.89 1209.43 S 5778.88 E 2448728.37 N 206412.02 E 0.913 5858.68 9100.00 54.820 99.800 6217.96 6307.96 1223.51 S 5859.06 E 2448714.29 N 206492.20 E 0.691 5939.10 9200.00 55.880 99.820 6274.81 6364.81 1237.52 S 5940.12 E 2448700.28 N 206573.26 E 1.060 6020.32 9300.00 55.370 100.030 6331.28 6421.28 1251.75 S 6021.42 E 2448686.05 N 206654.56 E 0.539 6101.84 9400.00 55.110 101.720 6388.29 6478.29 1267.25 S 6102.10 E 2448670.55 N 206735.24 E 1.413 6183.18 9500.00 55.460 102.050 6445.24 6535.24 1284.17 S 6182.53 E 2448653.63 N 206815.67 E 0.443 6264.76 9600.00 56.130 102.230 6501.46 6591.46 1301.57 S 6263.39 E 2448636.23 N 206896.53 E 0.686 6346.88 9700.00 55.910 102.400 6557.35 6647.35 1319.25 S 6344.40 E 2448618.55 N 206977.54 E 0.261 6429.25 9800.00 56.080 102.920 6613.27 6703.27 1337.42 S 6425.28 E 2448600.38 N 207058.42 E 0.463 6511.65 9900.00 56.270 103.180 6668.94 6758.94 1356.18 S 6506.21 E 2448581.62 N 207139.35E 0.288 6594.29 30 April,2003-9:48 Page 4 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services i Proposal Report for Plan:Redoubt Unit#4A Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 10000.00 56.540 103.360 6724.27 6814.27 1375.30 S 6587.29 E 2448562.50 N 207220.43 E 0.309 6677.18 10100.00 56.670 103.590 6779.31 6869.31 1394.76 S 6668.48 E 2448543.04 N 207301.62 E 0.232 6760.29 10200.00 54.410 103.650 6835.89 6925.89 1414.17 S 6748.61 E 2448523.63 N 207381.75E 2.261 6842.39 10300.00 53.620 103.840 6894.65 6984.65 1433.40 S 6827.20 E 2448504.40 N 207460.34 E 0.805 6922.97 10400.00 53.390 103.900 6954.12 7044.12 1452.67 S 6905.25 E 2448485.13 N 207538.39 E 0.235 7003.05 10500.00 52.990 105.150 7014.04 7104.04 1472.74 S 6982.75 E 2448465.06 N 207615.89 E 1.078 7082.87 10600.00 54.300 106.270 7073.32 7163.32 1494.56 S 7060.28 E 2448443.24 N 207693.42 E 1.590 7163.28 • 10700.00 57.670 106.900 7129.25 7219.25 1518.22 S 7139.70E 2448419.58 N 207772.84E 3.410 7246.08 10800.00 60.070 107.960 7180.95 7270.95 1543.87 S 7221.36 E 2448393.93 N 207854.50 E 2.566 7331.65 10900.00 60.240 107.750 7230.71 7320.71 1570.46 S 7303.92 E 2448367.34 N 207937.06 E 0.249 7418.37 11000.00 59.900 107.520 7280.61 7370.61 1596.72 S 7386.51 E 2448341.08 N 208019.65E 0.394 7505.01 11100.00 59.510 106.990 7331.05 7421.05 1622.33 S 7468.97E 2448315.47 N 208102.11 E 0.601 7591.32 11200.00 58.830 106.900 7382.30 7472.30 1647.36 S 7551.11 E 2448290.44 N 208184.25 E 0.684 7677.13 11300.00 58.320 106.450 7434.44 7524.44 1671.84 S 7632.85 E 2448265.96 N 208265.99 E 0.638 7762.40 11400.00 56.630 106.570 7488.21 7578.21 1695.80 S 7713.69 E 2448242.00 N 208346.83 E 1.693 7846.64 11500.00 55.590 106.440 7543.97 7633.97 1719.39 S 7793.28E 2448218.41 N 208426.42E 1.046 7929.57 11600.00 53.500 107.140 7601.97 7691.97 1742.91 S 7871.26E 2448194.89 N 208504.40E 2.166 8010.97 11700.00 52.800 107.380 7661.94 7751.94 1766.65 S 7947.67 E 2448171.15 N 208580.81 E 0.726 8090.95 11800.00 53.080 105.950 7722.21 7812.21 1789.53 S 8024.12 E 2448148.27 N 208657.26 E 1.175 8170.69 11900.00 53.560 106.250 7781.94 7871.94 1811.77 S 8101.17E 2448126.03 N 208734.31E 0.537 8250.79 12000.00 52.840 107.390 7841.85 7931.85 1834.94 S 8177.82E 2448102.86 N 208810.96E 1.163 8330.80 12100.00 52.810 107.370 7902.27 7992.27 1858.74 S 8253.86 E 2448079.06 N 208887.00 E 0.034 8410.45 12200.00 52.400 106.130 7963.00 8053.00 1881.64 S 8329.93 E 2448056.16 N 208963.07 E 1.067 8489.84 • 12300.00 52.410 105.190 8024.01 8114.01 1903.02 S 8406.22E 2448034.78 N 209039.36E 0.745 8568.94 12400.00 51.550 105.680 8085.60 8175.60 1923.99 S 8482.16 E 2448013.81 N 209115.30 E 0.943 8647.58 12500.00 52.420 105.690 8147.19 8237.19 1945.29 S 8558.01 E 2447992.51 N 209191.15 E 0.870 8726.23 12600.00 53.790 105.620 8207.22 8297.22 1966.87 S 8635.02 E 2447970.93 N 209268.16 E 1.371 8806.08 12700.00 54.920 105.870 8265.50 8355.50 1988.92 S 8713.23 E 2447948.88 N 209346.37 E 1.148 8887.21 12800.00 56.230 105.930 8322.03 8412.03 2011.52 S 8792.56 E 2447926.28 N 209425.70 E 1.311 8969.58 12900.00 57.130 105.940 8376.96 8466.96 2034.46 S 8872.91 E 2447903.34 N 209506.05 E 0.900 9053.03 13000.00 57.690 105.600 8430.82 8520.82 2057.36 S 8953.99 E 2447880.44 N 209587.13 E 0.629 9137.16 13100.00 58.620 105.040 8483.59 8573.59 2079.80 S 9035.92 E 2447858.00 N 209669.06 E 1.045 9221.93 13200.00 58.320 104.150 8535.88 8625.88 2101.28 S 9118.41 E 2447836.52 N 209751.55E 0.816 9306.92 13300.00 58.680 102.990 8588.13 8678.13 2121.28 S 9201.29E 2447816.52 N 209834.43E 1.053 9391.81 13400.00 57.710 102.430 8640.84 8730.84 2139.98 S 9284.19E 2447797.82 N 209917.33E 1.080 9476.30 30 April,2003-9:48 Page 5 of 8 DriliQuest 3.03.02.005 w Sperry-Sun Drilling Services - Proposal Report for Plan:Redoubt Unit#4A Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 13500.00 57.570 102.150 8694.36 8784.36 2157.96 S 9366.72 E 2447779.84 N 209999.86 E 0.275 9560.20 13600.00 57.210 101.490 8748.25 8838.25 2175.22 S 9449.17 E 2447762.58 N 210082.31 E 0.662 9643.79 13700.00 55.260 101.530 8803.83 8893.83 2191.80 S 9530.63E 2447746.00 N 210163.77E 1.950 9726.22 13800.00 54.740 100.570 8861.19 8951.19 2207.51 S 9611.02E 2447730.29 N 210244.16E 0.943 9807.36 13900.00 54.530 99.750 8919.06 9009.06 2221.89 S 9691.29E 2447715.91 N 210324.43E 0.701 9887.95 14000.00 55.290 99.930 8976.55 9066.55 2235.88 S 9771.91 E 2447701.92 N 210405.05 E 0.774 9968.75 • 14100.00 55.340 99.800 9033.46 9123.46 2249.96 S 9852.92 E 2447687.84 N 210486.06 E 0.118 10049.95 14200.00 53.910 99.180 9091.35 9181.35 2263.41 S 9933.34E 2447674.39 N 210566.48E 1.517 10130.38 14300.00 53.190 98.790 9150.76 9240.76 2275.97 S 10012.79 E 2447661.83 N 210645.93 E 0.785 10209.61 14400.00 52.420 99.200 9211.21 9301.21 2288.43 S 10091.47 E 2447649.37 N 210724.61 E 0.836 10288.07 14500.00 52.040 99.470 9272.46 9362.46 2301.25 S 10169.47 E 2447636.55 N 210802.61 E 0.436 10366.02 14600.00 51.030 99.400 9334.67 9424.67 2314.08 S 10246.71 E 2447623.72 N 210879.85 E 1.011 10443.24 14700.00 50.530 98.350 9397.90 9487.90 2326.04 S 10323.25 E 2447611.76 N 210956.39 E 0.955 10519.52 14800.00 49.170 96.640 9462.38 9552.38 2336.02 S 10399.03 E 2447601.78 N 211032.17 E 1.886 10594.44 14900.00 49.920 96.430 9527.26 9617.26 2344.68 S 10474.62 E 2447593.12 N 211107.76 E 0.767 10668.75 15000.00 51.060 95.590 9590.88 9680.88 2352.75 S 10551.35 E 2447585.05 N 211184.49 E 1.311 10743.95 Begin 6-3/4"Hole 7 5/8in Casing RU#4A WP02 15020.00 51.309 98.654 9603.42 9693.42 2354.68 S 10566.81 E 2447583.12 N 211199.95E 12.000 10759.20 Begin Dir @ 5.000°/100ft: 15020.00 MD,9693.42ft TVD 15100.00 48.130 101.837 9655.14 9745.14 2365.50 S 10626.85E 2447572.30 N 211259.99E 5.000 10819.50 15200.00 44.294 106.284 9724.35 9814.35 2382.93 S 10696.85 E 2447554.87 N 211329.99 E 5.000 10891.38 15300.00 40.656 111.368 9798.11 9888.11 2404.61 S 10760.75 E 2447533.19 N 211393.89 E 5.000 10958.84 15400.00 37.276 117.233 9875.88 9965.88 2430.35 S 10818.05 E 2447507.45 N 211451.19 E 5.000 11021.40 15500.00 34.232 124.029 9957.06 10047.06 2459.97 S 10868.31 E 2447477.83 N 211501.45 E 5.000 11078.55 15600.00 31.623 131.886 10041.03 10131.03 2493.23 S 10911.17E 2447444.57 N 211544.31E 5.000 11129.88 15700.00 29.567 140.852 10127.14 10217.14 2529.89 S 10946.29E 2447407.91 N 211579.43E 5.000 11174.99 15800.00 28.185 150.815 10214.76 10304.76 2569.67 S 10973.39E 2447368.13 N 211606.53E 5.000 11213.54 15900.00 27.580 161.440 10303.21 10393.21 2612.26 S 10992.29 E 2447325.54 N 211625.43 E 5.000 11245.23 15911.37 27.563 162.668 10313.29 10403.29 2617.27 S 10993.91 E 2447320.53 N 211627.05E 5.000 11248.39 End Dir,Start Sail @ 27.563°: 15911.37ftM D,10403.29ftTVD 16000.00 27.563 162.668 10391.86 10481.86 2656.42 S 11006.13E 2447281.38 N 211639.27E 0.000 11272.64 16100.00 27.563 162.668 10480.51 10570.51 2700.59 S 11019.91 E 2447237.21 N 211653.05E 0.000 11300.01 16200.00 27.563 162.668 10569.16 10659.16 2744.76 S 11033.70E 2447193.04 N 211666.84E 0.000 11327.38 16300.00 27.563 162.668 10657.81 10747.81 2788.93 S 11047.48E 2447148.87 N 211680.62E 0.000 11354.75 30 April,2003-9:48 Page 6 of 8 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Proposal Report for Plan:Redoubt Unit#4A Revised:25 April,2003 Cook Inlet Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100ft) 16400.00 27.563 162.668 10746.46 10836.46 2833.10 S 11061.27E 2447104.70 N 211694.41 E 0.000 11382.12 16500.00 27.563 162.668 10835.11 10925.11 2877.27 S 11075.05 E 2447060.53 N 211708.19 E 0.000 11409.49 16600.00 27.563 162.668 10923.76 11013.76 2921.44 S 11088.84E 2447016.36 N 211721.98 E 0.000 11436.86 16700.00 27.563 162.668 11012.41 11102.41 2965.61 S 11102.62E 2446972.19 N 211735.76E 0.000 11464.23 16800.00 27.563 162.668 11101.06 11191.06 3009.79 S 11116.41 E 2446928.01 N 211749.55E 0.000 11491.60 16900.00 27.563 162.668 11189.71 11279.71 3053.96 S 11130.19E 2446883.84 N 211763.33E 0.000 11518.97 • 17000.00 27.563 162.668 11278.36 11368.36 3098.13 S 11143.98E 2446839.67 N 211777.12E 0.000 11546.33 17100.00 27.563 162.668 11367.01 11457.01 3142.30 S 11157.76 E 2446795.50 N 211790.90 E 0.000 11573.70 17200.00 27.563 162.668 11455.66 11545.66 3186.47 S 11171.55E 2446751.33 N 211804.69E 0.000 11601.07 17300.00 27.563 162.668 11544.31 11634.31 3230.64 S 11185.33E 2446707.16 N 211818.47E 0.000 11628.44 17400.00 27.563 162.668 11632.96 11722.96 3274.81 S 11199.12E 2446662.99 N 211832.26E 0.000 11655.81 17500.00 27.563 162.668 11721.61 11811.61 3318.98 S 11212.90E 2446618.82 N 211846.04E 0.000 11683.18 17600.00 27.563 162.668 11810.26 11900.26 3363.16 S 11226.69E 2446574.64 N 211859.83E 0.000 11710.55 17700.00 27.563 162.668 11898.91 11988.91 3407.33 S 11240.47E 2446530.47 N 211873.61 E 0.000 11737.92 17746.35 27.563 162.668 11940.00 12030.00 3427.80 S 11246.86 E 2446510.00 N 211880.00 E 0.000 11750.60 Target-RU#4A T1,Current Target 17800.00 27.563 162.668 11987.56 12077.56 3451.50 S 11254.26 E 2446486.30 N 211887.40 E 0.000 11765.29 17900.00 27.563 162.668 12076.21 12166.21 3495.67 S 11268.04E 2446442.13 N 211901.18E 0.000 11792.66 18000.00 27.563 162.668 12164.86 12254.86 3539.84 S 11281.83E 2446397.96 N 211914.97E 0.000 11820.02 18100.00 27.563 162.668 12253.51 12343.51 3584.01 S 11295.61 E 2446353.79 N 211928.75 E 0.000 11847.39 18200.00 27.563 162.668 12342.16 12432.16 3628.18 S 11309.39E 2446309.62 N 211942.53E 0.000 11874.76 18300.00 27.563 162.668 12430.81 12520.81 3672.35 S 11323.18E 2446265.45 N 211956.32E 0.000 11902.13 18344.20 27.563 162.668 12470.00 12560.00 3691.88 S 11329.27 E 2446245.92 N 211962.41 E 0.000 11914.23 5 1/2in Liner All data is in Feet(US Survey)unless otherwise stated.Directions and coordinates are relative to Grid North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes,Zone 4. The Dogleg Severity is in Degrees per 100 feet(US Survey). Vertical Section is from Well and calculated along an Azimuth of 108.930°(Grid). Coordinate System is NAD27 Alaska State Planes,Zone 4. Grid Convergence at Surface is-1.457°. Based upon Minimum Curvature type calculations,at a Measured Depth of 18344.20ft., The Bottom Hole Displacement is 11915.64ft.,in the Direction of 108.049°(Grid). 30 April,2003-9:48 Page 7 of 8 Dril/Quest 3.03.02.005 • • REDOUBT UNIT #4A WELLHEAD SCHEMATIC I---24.31" I ,.,II,., MN ,.,.u,., •,,'• 3-1/8 5000 m,,,,60_ 'ao.6a . 3-1/8 5000 i1 Aa mom 18.63" r •H.„ nn IOU �8I 13-5/8 5000 60X ill H ai ALIGNMENT PIN A , SHOWN 1O OUT OF POSITION 28.00" .. 2-1/16 5000 W/VR I j I% 'I gal "_ 13-5/8 5000 6BX �� 7 r _lii ' (I 2-1/16 5000 W/VR 24.75' j i i i``ii jaP a .3. I iiia lII i 19.50" ', i '. Id., rl 36' OD CASING I 13-3/8" OD CASING 3-1/2" OD TURIN I 9-5/8" 00 CASING ALL DIMENSIONS ARE APPROX. • Nabors Rig 429 13-5/8" 5000 psi BOP Stack Redoubt Unit #4A 5000 psi Annular 5000 psi Blind Rams 5000 psi Pipe Rams 3" Kill Line DXIXE Mud Crosse 3" Choke Line 1 2 2 1 1 =HCR Valve 2 =Gate Valve 5000 psi Pipe Rams 13 3/8"5M Wellhead 13-3/8"Surface Casing 9-5/8"Intermediate • • • BLOWOUT PREVENTION EQUIPMENT NABORS RIG No . 429 13-5/8" BOP Equipment 3 ea 13-5/8" x 5000 psi wp ram type preventers (Hydril) 1 ea 13-5/8"x 5000 psi wp annular preventer(Hydril) 1 ea 13-5/8"x 5000 psi wp drilling spool with 2 ea 4" side outlets (choke and kill), HCR and manual valves on both choke and kill lines. 1 ea BOP accumulator, Koomey Model T20000-3S blowout preventer control unit with 280 gallon volume tank, main energy provided by two 20 HP electric motor driven triplex plunger pump charging 16 each 11-gallon bladder type separate accumulator bottles. Second energy charging system consists of two air pumps. Above two energy systems backed up by six each 220 cubic feet nitrogen bottles connected to the manifold system. All above system controlled by a Model SU2KB7S S series manifold with six manual control stations at the unit. • DRILLING FLUID SYSTEM DESCRIPTION Mud Pumps 2 ea IDECO T1600 (triplex, single acting pistons), 5000 psi fluid end discharge manifold system. Gear end equipped with electric driven lube oil pump, filtration. Pumps are driven by two each traction motors designed to stroke pumps at a maximum of 120 SPM under full load. Pumps are charged by two 40 HP, 1200 RPM Mission 5"x 6" centrifugal pumps. Mud Tank System(975 bbls Total Volume) Tank#1 (desander tank) appx. 170 bbls. Tank#2 (mud cleaner tank) appx. 145 bbls. Tank#3 (centrifuge tank) appx. 145 bbls. Tank#4 (suction tank) appx. 44 bbls. Tank#5 (pill tank) appx. 44 bbls. Tank#6 (volume tank) appx. 430 bbls. Trip Tank appx. 40 bbls. Located in the substructure. Mud System Equipment 3 ea Derrick dual tandem shale shakers 1 ea Derrick 20 cone desilter 1 ea Geosource sidewinder mud hopper 3 ea Brandt 15 HP mud agitators 2 ea Brandt 5 HP mud agitators 3 ea Mission Magnum pumps, 6"x 8" centrifugal with 100 HP motors 1 ea Mission Magnum pump, 4"x 5" centrifugal with 25 HP motor 1 ea DEMCO desander,two 12" cones 1 ea Brandt Model CF-2 centrifuge • 0 I 1 k :�1 N Ili ► L OD I I, I II M m c , X11 N f EA ° i M 1 ‘1,-_, -1, 1 i , H si I ` 1 t ff' I 1 ril 1, �l I l .a, III 1 1 1 J iii, I , 1 l ici i 6.111 r Y t o �� 1 p fi °C , op, ._ IE 1,..J08"0 0 I 1� I1 , a 8 r I ^.n II CC CO Ui Y 1, C� ;, V r Q ..r Cfl 1=i 0 0 Z c 11-1 z w o rl O \ 0 1 \.,:, z 9 W 11I 0 3 O �'- Q_o o u. I '; •1.a 3x13 • o � E s F O R E S T O I L C O R P O R A T I O N �9 0 i6 .310(7J('l7eet • artette 700 eA C2 A s r9.9507 _ , (907) X58-8600 • 9072,258-8609 (76i6 ) May 1, 2003 Alaska Oil and Gas Conservation Commission 333 West 70'Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill (Form 10-401) Redoubt Unit#4A Enclosed is the Application for the Permit to Drill the Redoubt Unit#4A development well from Forest Oil's Osprey Platform. This well is a sidetrack of the existing Redoubt Unit#4. RU#4A will kick off at 15,000' MD and penetrate the Hemlock formation higher up on-structure and to the south in the main Fault Block. The new hole section will be drilled with Oil Based Mud. All mud and cuttings will be re-injected on the Osprey Platform. We have the grind and inject equipment on the platform to perform this task. If there are any questions, please contact me at 258-8600. Ic2aAm -• RECEIVED Paul White MAY 0 1 2003 Drilling Manager Alaska Oil&Gas Cons. Commission Forest Oil Corporation—Alaska Division Anchorage ORIGINAL 7 I TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI The permit is for a new wellbore segment of LATERAL existing well , Permit No, API No. (If API number Production should continue to be reported as last two (2) digits a function of the original API number stated are between 60-69) above. PILOT HOLE In accordance with 20 AAC 25.005(1), all (PH) records, data and logs acquired for the pilot bole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well(name on permit). SPACING The permit is approved subject to full EXCEPTION compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the SAMPLE Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Rev:07/10/02 C\jody\templates WELL PERMIT CHECKLIST COMPANY AZ...xi C1,') WELL NAME,tif - y/'1 PROGRAM: Exp Dev)e Redrll . Re-Enter Sery Wellbore seg FIELD&POOL 72o/00 INIT CLASS ,Del i /-d.'2 GEOL AREA 8ZQ UNIT# //7/o ON/OFF SHORE ©f� ADMINISTRATION 1. Permit fee attached Y N 2. Lease number appropriate. Y N 3. Unique well name and number Y N 4. Well located in a defined pool. Y N , 5. Well located proper distance from drilling unit boundary. . . . Y N _ _ ,; _ ,., _ (, 6. Well located proper distance from other wells. Y N APPR DATE 7. Sufficient acreage available in drilling unit. Y N 8. If deviated, is wellbore plat included. Y N ,/' ,c� 9. Operator only affected party. Y N 10. Operator has appropriate bond in force Y N 11. Permit can be issued without conservation order Y N 12. Permit can be issued without administrative approval. `Y N (Service Well Only) 13. Well located w/in area&strata authorized by injection order# )/I( _ (Service Well Only) 14. All wells w/in'/4 mile area of review identified N �� ENGINEERING 15. Conductor string provided N S`lOcrmc\c_ o� QI M c--k.. v.Yc\‘ Ilk 16. Surface casing protects all known USDWs. N 17. CMT vol adequate to circulate on conductor&surf csg N 18. CMT vol adequate to tie-in long string to surf csg N 19. CMT will cover all known productive horizons N 1R S ■ y 3(=f:Szo k 20. Casing designs adequate for C,T, B&permafrost. N ` 1 c1 Cg l 1 Q y''‘It• 21. Adequate tankage or reserve pit. N cc-lz-AN.+. �c�Il�ct�+�l:c.„>9 c,\Q9.-\ �D\ 6e\\\\tic yw,,sS�q \ C\ecsS U 22. If a re-drill, has a 10-403 for abandonment been approved. . N '3O 3-‘3* ` �. .A\- ,] 23. Adequate wellbore separation proposed. N 24. If diverter required,does it meet regulations --Y--N Q A 25. Drilling fluid program schematic&equip list adequate N 26. BOPEs,do they meet regulation i N APPR DATE 27. BOPE press rating appropriate;test to - pC� psig. N Sa F sA C� S�S■ . Vii<c�s c > v ` :1 '""i Q \\n E\\ p s��_O 28. Choke manifold compliespw/API RP-53(May 84) N V�� � �y<�< `\t \c \-st- 3 29. Work will occur without o eration shutdown J 30. Is presence of H2S gas probable. Y (LV (Service Well Only) 31. Mechanical condition of wells within AOR verified -1� N. GEOLOGY 32. Permit can be issued w/o hydrogen sulfide measures. . . . . V N APPR DATE 33. Data presented on potential overpressure zones Y N • 34. Seismic analysis of shallow gas zones Y /v' I, 5W,3 35. Seabed condition survey(if off-shore) N (Exploratory Only) 36. Contact name/phone for weekly progress reports N GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Comments/Instructions: RP TEM JDH JBR -603` DTS SFD WGA MJW Rev:07/12/02 ---... r) 1I G:\geology\perm its\check)ist.doc