Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout210-094 r Ii..V-I r GV . STATE OF ALASKA SEP 1 6 2015 ALASKA OIL AND GAS CONSERVATION COMM )N WELL- ..OMPLETION OR RECOMPLETION REPORT AND LOG A OGVV la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned RI . Suspended 0 1b.Well Class: I t V 20AAC 25.105 20AAC 25.110 Development I I Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Com Susp.,o Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 8 015 ¢3.VI 210-094 3. Address: 7. Date Spudded: 4/:2,5:lj 15' API Number • P.O.Box 196612 Anchorage,AK 99519-6612 8/21/2010 50-029-20529-60-00 - 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number 8/24/2010 PBU 14-11AL1 • Surface: 1776'FNL,1759'FEL,Sec.09,T10,R14E,UM - 17. Field/Pool(s): 9. KB(ft above MSL): 71.4' • Top of Productive Interval: 4999'FNL,2326'FEL,Sec.09,T10N,R14E,UM GL(ft above MSL): 42.26' PRUDHOE BAY,PRUDHOE OIL- Total Depth: 5063'FNL,1439'FEL,Sec.09,T10N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 10350'/8840' ' ADL 028312 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 674727• y- 5938553 • Zone - ASP 4 • 11818'/8962' • TPI: x- 674242 y- 5935318 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 675130 y- 5935274 Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey: Yes ❑ (attached) No El 13. Water Depth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) . 10369'/8850' • 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary GR,ROP,Press,Res 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 94# H-40 31' 111' 31' 111' 32" 300 sx Permafrost 13-3/8" 72# L-80 30' 2652' 30' 2652' 17-1/2" 1640 sx Fondu,400 sx Arctic Set II 9-5/8" 47# L-80 28' 7109' 28' 6843' 12-1/4" 500 sx Class'G' 7" 26# L-80 26' 10330' 26' 8828' 8-1/2" 168 sx Class'G',480 sx Class'G' 4-1/2" 12.6# L-80 10130' 10369' 8714' 8850' 6-1/8" Uncemented Slotted Liner 2-7/8" 6.16# L-80 10360' 11818' 8845' 8962' 4-1/8" Uncemented Slotted Liner 244' 24. Open to production or injection'? Yes 0 No El . 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): - 4-1/2"12.6#13Cr80 10145' 10090'/8691' A26. ACID,FRACTURE;CEMENT SQUEEZE,ETC. •� Was hydraulic fracturing used during completion? Yes 0 No 0 F Per 20 AAC 25.283(i)(2)attach electronic and printed ED j .P �t 2Q��3 t ,:'jg$aL T information � 1 ^T/ DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED t 10360' Cut&Pull Liner 10350' Set Whipstock - P7. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �.► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(coni): Press 24 Hour Rate �♦ Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only • 1/7-1... g'/Z z/'5 % 4 RBDMS EP 11 2015 , '3,s__-�(' 28. CORE DATA Conventional Core(s) Yes 0 No I Sidewall Cores Yes 0 No • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No 0 • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Shublik A 10366' 8849' AAC 25.071. Shublik B 10412' 8873' Shublik C 10443' 8887' Sadlerochit/46P/Zone 48 10512' 8904' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached indudes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sperry,Nathan Email: Nathan.Sperry@bp.com Printed Name: Joe Lastufk Title: Drilling Technologist Signature: Phone: 907-564-4091 Date: I/`5/f s INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump.Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or indination survey.and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only 14-11A/ L1, Well History (Pre-Rig Sidetrack) T/I/O/00 = 380/100/90/70. Temp= SI. TBG FL (Eline request). AL SI @ casing valve. ALP = 1990 psi. TBG FL @ 300' (4.6 bbl). SV, WV, SSV= C. MV= 0. IA/OA/OO = OTG. NOVP 1620 7/10/2015 hr. (SLB E-LINE CUT TUBING). INITIAL T/I/O = 300/ 100/ 100. RIH W/CCL/2.125" POWER JET CUTTER & CUT 2-7/8" LINER @ 10360'. TIED INTO SLB MEMORY CEMENT BOND LOG DATED 15-APR-2015. FINAL T/I/O = 300/ 100/ 100. WELL LEFT SHUT IN UPON DEPARTURE - 7/11/2015 NOTIFIED DSO OF WELL STATUS. T/I/O/00=SSV/1980/0+/0+, Temp=SI. PPPOT-T(PASS), pre tree replacement for CTD. PPPOT-T: Stung into test port(0+ psi), bled to 0 psi. Monitored for 10 min, no change in pressure. Single port, unable to pump through void. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 7/13/2015 0 psi in second 15 min (PASS). Bled void to 0 psi. CTU #9 w/1.75" CT Objective: Catch and release liner. MIRU, RIH with BOT fishing BHA, perform extended wt check at 10,000'. RIH and set down on liner top at 10,101' CTMD, PUH and found pickup wt to be 1.5k higher indicating that the liner was on the CT. POOH 100'to 10,000'wt still 1.5k higher. RIH and set down at 10,101', come online with the pumps and release liner. POOH and FP 7/24/2015 well down CTBS with 50/50 meth. T/1/0/00=TWC/15/50/50. RD Upper Tree. RU P SUB With HWO 5X7 SV and TS#5. Torque Flanges to API Specs. PT Flanges. PT MV to SV Verify SV Pass LTT. PT SV and TS#5. RDMO. Final 8/10/2015 T/1/0/00=TWC/150/50/50. T/I/O/00=425/150/50/50. Pre Nordic 2. Set 4""H" TWC#296. PT tree cap to 500 psi. Final WHP's 8/10/2015 TWC/150/50/50. T/I/O/00 = ?/130/40/70. Temp= SI. Bleed WHP's to 0 psi (pre CTD). TWC installed in Tbg. No well house, flow line, scaffold, or SSV. IA, OA, &OOA FL near surface. Bled IAP, OAP, &OOAP to 0 psi in 30 minutes (gas). During monitor IAP increased 20 psi, OAP, & OOAP unchanged. Re-bled IAP to 0 psi and held open for 2.5 hours. Monitored for 30 minutes. IAP increased to 0+, OAP unchanged, &OOAP increased to 0+. Final WHP's = ?/0+/0/0+. SV, WV, MV= ?. IA& OA= OTG. 8/12/2015 NOVP. 14:40. North America-ALASKA-BP Page 1 of Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:OOAM Rig Release:9/4/2015 Rig Contractor NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 8/15/2015 03:00 - 04:00 1.00 RIGU P PRE RELEASE RIG AT 03:00 DISCUSSED PRIOR TO MOVE WITH ALL INVOLVED THE CRITERIA OF OCN#4,WHICH ALLOWS PULLING OFF THE WELL WITH NO BPV INSTALLED.-PHYSICAL BARRIERS IN PLACE(12 X 12 CHOCKS)TO KEEP FROM ROLLING INTO WELL -ESD IN CELLAR MANNED BY NORDIC SUPERINTENDENT AND WAS TESTED PRIOR TO MOVING OFF -RADIO COMMUNICATION WAS VERIFIED PRIOR TO MOVING -AGREED UPON COMMAND"STOP" UNDERSTOOD. -ALL INVOLVED WERE AWARE OF THE BPV NOT BEING INSTALLED -DISCUSSED ROLES AND RESPONSIBILITIES WITH CREWAND ASSIGNED LOCATIONS AROUND RIG FOR SPOTTING -SITE CONTROL TASKED WITH KEEPING AREA CLEAR OF NON ESSENTIAL PERSONNEL 04:00 - 07:00 3.00 RIGU P PRE PULL OFF WELL AND MOVE TO SIDE OF PAD. 'PICKUP MATS AROUND WELLAND TIDY UP LOCATION. • 07:00 - 14:30 7.50 RIGU P PRE PJSM WITH SECURITY AND RIG CREW FOR MOVING RIG TO DS-14. REVIEW ROUTE HAZARDS AND SPOTTER POSITIONS. PULL RIG OFF J-PAD,RIGHT ONTO SPINE ROAD. MOVE RIG DOWN SPINE ROAD,RIGHT ONTO DS-14 ACCESS ROAD. 14:30 - 16:00 1.50 RIGU P PRE PREP PAD. PJSM. MOVE RIG OVER 14-11. ACCEPT RIG AT 16:00 16:00 - 20:00 4.00 RIGU P PRE DISCUSS TREE CONFIGUTRATION. RU ON 14-11 -PREP FOR LTT IN SWAB/MASTER. NIPPLE UP BOPE -AOGCC JEFF JONES WAIVED WITNESS AT 19:29 20:00 - 21:30 1.50 RIGU P PRE PJSM FOR PICKING UP REEL -PICKED UP REEL INTO REEL HOUSE. (72,000 LBS) -SIMULTANEOUS OPS INCLUDED. GREASE, GET MEASUREMENTS, PREP FOR BOPE TEST 21:30 - 00:00 2.50 RIGU P PRE PJSM FOR P/U INJECTOR/PULLING COIL ACROSS -INSTALL GRAPPLE INTO REEL. PULL TEST -REMOVE SHIPPING BAR -PULL ACROSS TO CHAINS, INCREASE TRACTION. TAKE CONTROL OF PIPE WITH INJECTOR -SWAP OUT PULL BACK CABLE/REMOVE GRAPPLE 8/16/2015 00:00 - 01:00 1.00 RIGU P PRE FINISH PREPPING FOR BOPE TEST. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 2 ota= Operation Summary Report Common Well Name: 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 , Spud Date/Time:7/4/1981 12:00:00AM •Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB t71.40usft(above Mean Sea Level) Date From-To ! Hrs F Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 07:00 6.00 BOPSUR P PRE 1 PJSM, BEGIN BOPE TEST -PERFORM H2S/RIG EVAC DRILL -CONTINUE TO PLACE EQUIPMENT AS TRAILERS ARRIVE -FILL COIL WITH FRESHWATER 07.00 - 09:30 2.50 BOPSUR P PRE i CONTINUE TESTING BOPS. WITNESS WAIVED BY JEFF JONES. TEST VBR AND ANNULAR WITH 3-1/2"AND 2-3/8"TEST JOINT. I TEST GAS ALARMS. RIG EVAC EXERCISE WITH DAY CREW. CONDUCT DRAWDOWN TEST. I FUNCTION TEST BOPS FROM DRILLERS AND _ SLB PANELS. 09:30 - 10:45 1.25 BOPSUR P PRE I MAKEUP INJECTOR FOR INNER REEL VALVE TEST. REVERSE CIRCULATE AND PT INNER REEL VALVE AND CT STRIPPER TO 250/3500 PSI. 1045 - 12:20 1.58 BOPSUR N PRE LEAK FOUND ON VALVE#5 ON THE KILL • !MANIFOLD. PERFORM LO/TO AND CHANGE OUT PACKING ON THIS VALVE. TRY TO TEST INNER REEL VALVE AGAIN, I -.STILL LEAKING. OPEN VALVE MMI AND INSPECT,FIND RUBBER SEATS ARE WASHED OUT. PERFORM LO/TO AND REBUILD VALVE MM1. 12:20 - 13:00 0.67 BOPSUR P' I PRE TEST INNER REEL VALVE AND CT STRIPPER TO 250/3500 PSI,GOOD. 13:00 - 14:30 1.50 BOPSUR P PRE VALVE CREW CONDUCTS PJSM WITH RIG CREW THEN TORQUES UP TREE BOLTS. 14:30 - 15:20 0.83 RIGU C PRE BP ASSURANCE VERIFICATION DISCUSSION WITH WELLS OPERATING AUTHORITY RICHARD HARLAND,DRILLER,TOOLPUSHER, WSLAND NORDIC SUPT. DISCUSS SIMOPS WITH DOYON 14,BOP SHEAR TABLE,MGS,AND STATION BILL. 15:20 - 16:30 1.17 RIGU P PRE PJSM THEN LIFT UP INJECTOR,INSTALL BTT 1 COIL CONNECTOR. PULL TEST TO 45K,GOOD. PRESSURE TEST TO 250/3500 PSI,GOOD. 16:30 - 17:00 0.50 RIGU P PRE LOAD BTT EQUIPMENT AND BPV LUBRICATOR ONTO RIG. 17:00 - 19:30 2.50 RIGU P PRE PJSM WITH BPV CREW. RIG UP BPV LUBRICATOR AND PT 250/3500 'PSI,GOOD. !MAKE NOTIFICATION TO PAD OP AND DOYON 14 FOR BLEEDING GAS. PULL TWC,460 PSI UNDER IT. SHUT MASTER VALVE AND BLEED OFF,THEN 1 SHUT SWAB. OFFLOAD BPV LUBRICATOR AND PULLING TOOLS. 19:30 21:45 2.25 RIGU P PRE MAKEUP INJECTOR AND PT TOP BOWEN CONNECTION THAT WAS BROKE OUT. PASSED LOW AND HIGH BREAK INJECTOR OFF, INSTALL NIGHT CAP. TEST Printed 9/15/2015 10:20:01 AM • Notch America-ALASKA-BP page 3 ct Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:45 - 00:00 2.25 RIGU P PRE PJSM, REVIEW PRESSURE CROSSCHECK WITH EVERYBODY INVOLVED BEGIN BULLHEAD T/IA/OA/OOA=461/72/6/57 -PUMP 5 BBL METHANOL SPEAR -PUMP 230 BBLS 1%KCL AFTER 60 BBLS AWAY. WELL ON VAC -PUMP 40 BBLS HI VIS WELL STILL ON VAC -PUMP 150 BBLS OF 1%KCL W/SAFELUBE -PUMPED ALL THE ABOVE AT 4.6 BPM -AFTER FLUIDS AWAY. LINE UP THROUGH CHOKE TO GET A LOSS RATE -WALK RATE UP FROM 4.6 BPM TO 7.2 BPM WITH NO RETURNS 8/17/2015 00:00 - 00:30 0.50 RIGU N DPRB PRE CALL ODE ABOUT LOSS RATE. SHUT WELL IN WHILE GETTING EVERYTING READY FOR POLYSWELL. RECEIVE OCN#1. ODE RECEIVED VERBAL FROM ETL(J.McMULLEN) AND ON CALL WTL (R.BURNETT)OPS SUPERINTENDENT GAVE GO AHEAD. PULL SCREENS ON PUMPS. SEND TRUCKS FOR MORE KCL. LOSS RATE WAS A LOT HIGHER THAN ANTICIPATED. 00:30 - 02:17 1.78 RIGU N DPRB ' PRE KCL ARRIVED. MUD ENGINEER ARRIVED. START ADDING KCL TO BRING UP TO 6%KCL PILL UP TO YP @-30LB/100FT2 FLUIDS ARE ALL HERE. 02:17 - 06:30 4.22 RIGU N DPRB PRE PJSM, START PUMPING 1%KCL STARTED PUMPING POLYSWELL. WELL SUCKING IT OUT OF PITS QUICKER THAN WE CAN DUMP. PUMPED A 112 BBL KCL BEHIND. UTILIZED PVT FOR VOLUME. DROP RATE BACK TO.5 BPM(2000'/HR HOLE FILL) LET LCM EXPAND. 06:30 - 08:45 2.25 RIGU N DPRB PRE CONTINUE PUMPING INTO WELL AT 0.5 BPM, WELL IS TAKING ABOUT 1 BPM THROUGH THE PUMP. BLEED OOA FROM 500 TO 200 PSI. BLEED OA FROM 650 PSI TO 100 PSI. 08:45 - 09:15 0.50 RIGU N DPRB PRE PJSM THEN OPEN UP WELLACROSS TOP TO MGS AND BACK TO PITS. PUMP ACROSS TOP TO ASSESS LOSS RATE AFTER 1ST POLYSWELL PILL. OPEN CHOKE,PUMP 174 BBLS IN 24 MIN,NO RETURNS SEEN. 09:15 - 12:30 3.25 RIGU N DPRB PRE REDUCE PUMP RATE TO 0.5 BPM,WELL IS TAKING ABOUT 1 BPM THROUGH THE PUMP. AT 0.77 BPM PUMP RATE WELL IS TAKING ABOUT 1.6 BPM. MIX UP SECOND POLYSWELL PILL AS PER OCN#2 LEVEL 1. Printed 9/15/2015 10:20:01 AM • North America-ALASKA BP Page a Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time-7/4/1981 12:00.00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB©71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 13:30 1.00 RIGU N DPRB PRE PJSM THEN START MIXING 45 BBLS OF 20#/BBL POLYSWELL IN 6%KCL. PIT#4 AGITATION NOT SUFFICIENT FOR THIS CONCENTRATION,USE ADDITIONAL SURFACE AGITATION. AFTER 13 MIN MIXING START PILL DOWNHOLE. PUMP 45 BBLS FROM PIT#4 AT 3.5 BPM, THEN CHASE WITH 1%KCL. AFTER 80 BBLS AWAY,START SEEING WHP. POLYSWELL NOT AT PERFS YET. DISPLACE 44 BBLS POLYSWELL+113 BBLS 1%KCLAT7.1 BPM. FINAL WHP AROUND 220 PSI. 13:30 - 14.10 0.67 RIGU N DPRB PRE OPEN CHOKE AND REDUCE RATE TO 0.5 BPM,WAIT FOR POLYSWELL TO TAKE ,EFFECT. CLEAN OUT PIT#4,ESTIMATE OF ABOUT 1 SACK POLYSWELL REMAINING,OUT OF 16 PUMPED. 14.10 - 14:45 0.58 RIGU N DPRB PRE RETURNS SEEN AT SLOW PUMP RATE,0.51/ 0.45 BPM. SWITCH TO NORMAL FLOW PATH AND FLOW CHECK THE WELL. STATIC. REMOVE NIGHT CAP AND WATCH WELL. PREP RIG FLOOR TO P/U FIRST BHA. 14:45 - 17:15 2.50 PULL P DECOMP PJSM THEN M/U BHA#1,FISHING BHA. M/U INJECTOR AND RIH. AT 800 FT,RETURN FLUID DENSITY<8.0 PPG. 10 MIN FLOW CHECK IS DRY,RETURNS LOOK FOAMY. CONTINUE RIH. 17:15 - 18:00 0.75 PULL P DECOMP GETTING SOME POLYSWELL BACK AT 6000 FT. WT CHECK AT 7000 FT IS 36K. WT CHECK AT 8000 FT IS 40K. WT CHECK AT 9000 FT IS 41 K. 18:00 19:00 1.00 PULL P DECOMP AT 9690 FT START LOSING RETURNS. PICK UP AND FIND LOSS RATE,ABOUT 2.5 BPM. LOST ALL RETURNS 19:00 - 21.00 2.00 PULL N DPRB DECOMP DISCUSS WITH TOWN THE PLAN FORWARD. POOH WITH BHA#1 PUMPING DOWN WELL AT 5.25 BPM WITH NO RETURNS STOP AT 200'. 21:00 - 21:30 0.50 PULL N DPRB DECOMP PJSM, DISCUSS PULLING BHA OUT OF WELL ON 100%LOSSES -DISCUSS WELL CONTROL ROLES DURING OPS -DISCUSS FLUID HANDLING -FLOOR VALVE READY FOR THE PH6 AND WE WILL SHORT CHAIN EVERYTHING OUT AND BREAK DOWN WAS WELL SHUT IN. 21:30 - 21:45 0.25 PULL N DPRB DECOMP REMOVE INJECTOR, PULLED BHA OUT OF WELL SHUT PUMP DOWN AND CLOSE MASTER AND SWAB VALVE. BREAK DOWN BHA Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 5 c3 Operation Summary Report Common Well Name: 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:45 - 00:00 2.25 PULL N DPRB DECOMP PREPARE FOR BATCH MIXING HIGHER VOLUME PILL HAVE DHD SHOOTA FLUID LEVEL-1218' AFTER 2 HOURS NO PUMPING. !SHOT AGAIN AFTER 10 MINUTES. -1218' 8/18/2015 00:00 - 01:00 1.00 LCR N DPRB DECOMP STAGE PRODUCT. SPOT ALL EQUIPMENT 01:00 - 03:15 2.25 LCR N DPRB DECOMP PJSM FOR OCN#3 LEVEL 1 POLYSWELL#3 -INJECTIVITY OF 5+BPM. SUCKING THROUGH OUR PUMPS. GAUGE 100 BBLS OFF VAC TRUCK -PUMPED 70 BBLS OF 20 PPB POLYSWELL IN 6%KCL W/POWERVIS L(-30YP) -PUMPED 87 BBLS OF 1%KCL(GAUGE OFF TRUCKS DO TO FLUIDS GETTING SUCKED THROUGH OUR PUMPS) -LEADING EDGE OF POLYSWELLAT 10328'-- SHUT PUMPS DOWN AT 02:30 -GIVE POLYSWELL 45 MIN TO SWELL. 03:15 - 06:30 3.25 LCR N DPRB ' DECOMP COME ONLINE DOWN KILL -PUMP 5.9 BBLS TO BRING UP TO 200#. SHUT PUMP DOWN FOR 10 MIN. PRESSURE DROPPED TO 150# -PUMP 11.8 BBLS TOTAL TO BRING UP TO •500#, SHUT PUMP DOWN. PRESSURE FELL TO 320#. LET SIT ANOTHER 15 MIN. DROPPED TO 260# -PUMP 20 BBLS TOTAL TO BRING TO 630#. THE WELL INJECTING. PUSH SOME MORE POLYSWELL BELOW CUT. PRESSURE FELL TO 400#. -PUMP 30 BBLS TOTAL TO BRING TO 700#. 0.8 BPM COME OFFLINE. DROPPED TO 510# THEN SLOWLY FALLING. FELL TO 350#AND HELD. -PUMP 35 BBLS TOTAL TO BRING TO 740# 0.4 BPM COME OFFLINE. DROPPED TO 600# THEN SLOWLY FALLING. FELL TO 410# HELD. -PUMP 40 BBLS TOTAL TO BRING TO 740#0.4 BPM. COME OFFLINE. DROPPED TO 640#, THEN SLOWLY FALLING CALLED ODE. CALLING 9000'TOP OF POLYSWELL STOPPING POINT OR 1000# SQUEEZE PRESSURE -PUMP 45 BBLS TOTAL TO BRING TO 820#0.5 BPM. COME OFFLINE. DROPPED TO 710#, THEN SLOWLY FALLING. 06:30 - 07:00 0.50 LCR N DPRB DECOMP HAVE PUSHED TOP POLYSWELL TO 8750 FT. WHP IS 322 PSI AND SLOWLY BLEEDING OFF. PUMP 1 BBL AT 0.5 BPM/790 PSI. PUSH TOP POLYSWELL DOWN TO 8816 FT. PRESSURE SLOWLY BLEEDING OFF. 07:00 - 08:40 1.67 LCR N DPRB DECOMP PUMP ANOTHER 1 BBL AT 840 PSI,TOP POLYSWELL NOW AT 8882 FT. PRESSURE SLOWLY BLEEDING OFF TO 320 PSI. AT 07:30 PUMP 1 BBL AT 0.5 BPM/830 PSI. TOP POLYSWELLAT 8947 FT. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 6 ov43, Operation Summary Report Common Well Name: 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs ' Task Code NPT NPT Depth Phase ! Description of Operations (hr) I (usft) 08:40 - 09:10 0.50 LCR N DPRB DECOMP WHPAT 240 PSI. PUMP FINAL BBL INTO THE WELL,BRING TOP POLYSWELL DOWN TO 9000 FT. 0.5 BPM/PRESSURE LEVELS OUT AT 760 PSI. I AFTER 20 MIN WHP HAS BLED OFF TO 320 PSI. BLEED OFF WHP SLOWLY TO ZERO,WELL IS STATIC. REMOVE NIGHT CAP AND WATCH WELL FOR 10 MIN. 09:10 - 10:00 0.83 PULL N DPRB DECOMP 'P.I.SM THEN M/U BHA#2,LINER FISHING BHA. BHA DAL=94.15 FT. 10:00 - 12:00 2.00 PULL N DPRB DECOMP RIH BHA#2. SOME LIGHT RETURNS(<8 PPG)SEEN AT 2800 FT,STOP AND FLOWCHECK 10 MIN. TRIP SHEET IS EVEN TO THIS POINT, FLOWCHECK IS DRY. GETTING FOAMY RETURNS SIMILAR TO YESTERDAY. I CONTINUE RIH,PUMP 1.5 BPM/940 PSI WHILE RIH. 12:00 - 12:50 0.83 PULL N DPRB DECOMP IWT CHECK AT 9000 FT IS 40K. { CONTINUE RIH PAST HERE AT 30 FT/MIN, PUMP 2.0 BPM/1630 PSI. AT 9650 START LOSING RETURNS,PICK UP AND CIRC EXCESS POLYSWELL OUT. OUT RATE DECLINING. 12:50 - 14:50 2.00 PULL N DPRB _ DECOMP AT 9250 FT CIRC PRESSURE DECLINES,LOSE ALL RETURNS,LINE UP PUMP DOWN THE I KILL LINE. PUMP 3.5 BPM DOWN ANNULUS,1.5 BPM DOWN CT. GET 1.0 BPM BACK FORA SHORT TIME THEN GOES AWAY. CAN'T KEEP THE HOLE FULL AT 5.1 BPM, POOH. 14:50 - 15:20 0.50 PULL N DPRB DECOMP TAG STRIPPER,FINISH TOPPING PITS. PUMP DOWN KILL LINE 6.9 BPM GETTING 0.4 BPM BACK. DIAL RATE BACK TO 6.2 BPM. 15:20 - 15:30 0.17 PULL N DPRB DECOMP PJSM THEN PULL BHA#2 OUT OF WELL. WITH A FULL WELL REDUCE KILL LINE PUMP • RATE TO 2 BPM WHILE REMOVING BHA 15:30 - 16:30 j 1.00 I PULL N DPRB DECOMP I INSTALL NIGHT CAP,CONTINUE TO PUMP I INTO WELL AT 2.0 BPM. 16:30 - 19:00 2.50 PULL N DPRB DECOMP DISCUSS WITH ODE,DECIDE TO PUMP A FOURTH POLYSWELL SWEEP.ORDER OUT MORE FLUIDS&PRODUCTS.CIO WITH DAY CREW.PERFORM WALK AROUNDS. 19:00 - 19:30 0.50 PULL N DPRB DECOMP PJSM REGARDING PUMPING POLYSWELL PILL.CONTINUE TO FILL HOLE AT 2BPM/OPSI. 19:30 - 20:50 1.33 PULL N DPRB DECOMP FILL&BATCH UP 2 PODS 35BBLS EACH& CREATE 6%KCL.VIS UP EACH POD TO 30YP. CONTINUE TO FILL HOLE AT 2BPM/OPSI. •CONFIRM FLUID VIA MUD ENGINEER.MIX POLYSWELL.BLEED OFF OCA FROM 450PSI TO OPSI-ALL GAS.BLEED DOWN OA FROM 550PSI TO OPSI ALL FLUID-2 BELS. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 7 ofi3 Operation Summary Report Common Well Name: 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date.8/27/2015 X3-0172J-C:(2,993.246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB©71.40usft(above Mean Sea Level) Date I From-To Hrs Task I Code NPT I NPT Depth Phase Description of Operations (hr) _ (usft) 20:50 - 21:30 0.67 ! PULL N DPRB DECOMP I PUMP FIRST POD OF 35BBLS OF 687# POLYSWELLAT 3BPM/OPSI.SIMELTANEOUSLY I BATCH UP SECOND POD WITH POLYSWELL. I PUMP SECOND POD OF 35BBLS OF 687# POLYSWELLAT 3BPM/OPSI.DISPLACE WITH 96BBLS OF 1%KCL INJECTING-5 BBLS OF POLYSWELL INTO SLOTTED LINER.OBSERVE 500PSI BUMP OF WHP AT FINAL DISPLACEMENT.SHUT DOWN.SHUT IN KILL ''LINE. 21:30 - 22:00 0.50 PULL N DPRB DECOMP WAIT 30 MIN FOR POLYSWELL TO SWELL. 22:00 - 22:20 0.33 PULL N DPRB DECOMP OPEN KILL LINE.FILL HOLE AT 1BPM FROM PITS.AT 4BBLS AWAY,CAUGHT PRESSURE. I SLOWLY BUILD WHP'.STOP AT 2OBBLS AWAY, WHP 105PSI.BLED DOWN TO OPSI _ IIMMEDIATELY. 22:20 - 22:35 i 0.25 _PULL N DPRB. _ DECOMP WAIT FOR i5MIN. 22:35 - 22:55 0.33 PULL N DPRB DECOMP PUMP AT 1BPM,IMMEDIATELY BUILD UP TO 1132PSI.SLOWLY BUILD WHP TO 230PSI, I BROKE OVER&FELL TO 130PSI.WITH TOTAL OF 33BBLS AWAY,STOP PUMPING.BLED DOWN TO OPSI IMMEDIATELY. 22:55 - 23:10 0.25 PULL N DPRB DECOMP WAIT FOR 15 MIN. 23:10 - 23:25 0.25 PULL N DPRB DECOMP 1 PUMP AT 1BPM, IMMEDIATELY BUILD UP TO 132PSI.NOT BUILDING ANYMORE WHP.WITH 48BBLS TOTAL INJECTED,STOP&FILL ACROSS THE TOP TO SEE FILL RATE. RETURNS RIGHT AWAY.1.34BPM IN/1.27BPM OUT. 23:25 - 23:35 0.17 PULL N DPRB DECOMP PJSM REGARDING MU FISHING BHA. 23:35 - 00:00 0.42 PULL N DPRB DECOMP PULL NITE CAP.FLOW CHECK-STATIC.MU FISHING BHA.PU INJECOTR&STAB ONTO WELL.ZERO COUNTERS.TEST QTS, 250PSI/3500PSI.LINE UP TO CIRC DOWN COIL.CIRC 1%KCL AT 0.45BPM IN/0.43BPM OUT AT SIPS!. 8/19/2015 00:00 - 00:15 0.25 PULL N DPRB DECOMP CONTINUE TO MU FISHING BHA.STAB ONTO WELL.PREP TO RIH.CIRC 0.46BPM IN/82 PSI. 00:15 - 03:15 3.00 I PULL N DPRB DECOMP ADD SAFE LUBE TO SYSTEM.RIH,CIRC 0.43BPM IN/82PSI CTP.STOP AT 2041 FT. I FLOW CHECK-OK.ADD DEFOAMER TO PITS. MINOR AMOUNTS OF POLYSWELL COMING OVER THE SHAKER.WT CKAT 8000FT,36K. WT CKAT 8500FT,37K.WT CKAT 9000FT, 41K.SLOWLY LOOSING RETURNS AFTER 9200FT.WT CKAT 9500FT,44K.WT CKAT 10000FT,48K.SLOWLY PUH&PUMP 1.67BPM DOWN COIL&2.4BPM DOWN KILL LINE, 0.4BPM LOSS RATE-3.5BPM LOSS RATE. CONTINUE SAME RATE&RIH.STACK OUT AT i 1011 OFT.LOSS RATE IS-2.5BPM.REPEAT 4 TIMES.FLOW CHECK-NO FLOW. 03:15 - 03:30 0.25 PULL P DECOMP ENGAGE FISH,TOP OF LINER AT 10,116'. SET DOWN 9K PICK UP TO CONFIRM LATCHED. 03:30 - 05:45 2.25 I PULL P DECOMP 1 POH.CIRC 2.4BPM DOWN KILL LINE AND ',!0.5BPM DOWN COIL.FLOW CHECK AT 9000FT -NO FLOW.LOSS RATE-2.5BPM.CONTINUE TO POH. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 8 ot$3, Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay I Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor.NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:45 - 06:30 0.75 PULL P DECOMP POH TO 50'.FLOW CHECK POH TO FISH. 06:30 - 08:15 1.75 PULL P DECOMP LAY DOWN FISH:WITH 8 JTS 2-7/8"LINER,10' PUP JT AND 4.1'CUT JOINT,244 FT. JET CUT IS CLEAN. LAY DOWN BOT FISHING TOOLS I REMOVE FISH FROM PIPE SHED FOR"NORM" INSPECTION 08'.15 - 08:30 0.25 PULL P DECOMP STAB ON INJECTOR.PUMP SLACK BACK 08:30 - 10:15 1.75 PULL P DECOMP RIG UP HYDRAULIC COIL CUTTER. I**WELL ON FULL LOSES AT 09:00 HRS.TRY FILLING HOLE AT 5 BPM WITH NO SUCCESS** SLOW PUMP RATE TO 2 BPM DOWN WELL WITH NO RETURNS. CONSULT WITH ODE !AND SUPERINTENDENT. CUT 257'OF COIL DISCUSS FORWARD PLAN WITH ODE, DECIDE TO PUMP A FIFTH POLYSWELL PILL. START PREPPING PITS AND PRODUCT. 10:15 - 13:00 2.75 PULL P DECOMP RE HEAD COIL TUBING CONNECTOR. PULL TEST TO 35K AND PRESSURE TEST TO 4000 PSI.PRESURE TEST FAILED.REMOVED CONNECTOR AND REINSTALLED. GET GOOD PULL TEST AND PRESSURE TEST, 250/3500 PSI. 'CONTINUE MIXING POLYSWELL PILL. 13:00 - 14:30 1.50 PULL N DPRB. DECOMP DISCUSS DEVIATION FOR OPERATIONS WITH NO FLUID AT SURFACE. REVIEW PUMP LINE UPS AND CONTINGENCIES WITH WTL,CTD SI, I i TOOLPUSHER AND WSL. 1 CONDUCTA DRY RUN TO TEST THE PROCESS OF SPLITTING THE PUMPS. 14:30 - 16:30 2.00 PULL C DECOMP INSTALL SCREENS IN PUMP#1 THAT WERE REMOVED FOR PUMPING POLYSWELL. PERFORM TEST OF SPLITTING MUD PUMPS SO THAT KILL LINE RATE USING PUMP#1 WITH GRAVITY FEED CAN BE VERIFIED VIA PVT READINGS INDEPENDENTLY OF PUMP#2 WHICH IS ON THE CHARGE PUMP. LINE UP SUCTION AND HI-PRESSURE VALVES TO PUMP DOWN THE CT WITH PUMP#2, DOWN THE KILL LINE WITH PUMP#1. PUMP 1 BPM WITH PUMP#1 ON GRAVITY FEED,2-3 BPM WITH PUMP#2 ON CHARGE IPUMP FROM A VAC TRUCK TO SIMULATE DRILLING CONDITIONS. PIT WATCHER VERIFIES KILL LINE FEED IS 1 BPM,MATCHING PUMP STROKES. SIMULATE PUMPING A SWEEP BY FEEDING PUMP#2 FROM THE PITS FOR 30 BBLS,THEN !BACK TO THE TRUCK ALL SYSTEMS WORK AS PLANNED. I I CONDUCT AAR FOR THE OPERATION. CONDUCT AAR FOR THE POLYSWELL OPERATION. Printed 9/15/2015 10:20:01AM Pape 9 ptr128„ Operation Summary Report Common Well Name. 14-11 AFE No Event Type,RE-ENTER-ONSHORE(RON) ! Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time 7/4/1981 12.00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB©71.40usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 19:15 2.75 PULL N HMAN DECOMP POP OFF 1NELL,FIND THAT CABLE SLACK IHAS BEEN PUMPED OUT OF REEL. NOZZLE WAS USED THAT HAD TOO LARGE A HOLE ON THE BOTTOM,ALLOWING CABLE TO COME OUT. RE-BOOT CABLE AND PUMP SLACK BACK INTO REEL RIG UP HYDRAULIC CUTTER AND CUT 260 FT OF CT. INSTALL CTC.PULL TEST TO 35K& PRESSURE TEST 25OPSI/4000PSI. 19 15 - 00:00 4.75 PULL P DECOMPSTABONTO WELL.PUMP SLACK FORWARD. TEST WIRE.REHEAD BHI.TEST WIRE. PRESSURE TEST CTC 250PSI/4000PSI.TEST BHI CHECK VALVES.REVIEW OCN#7 WITH CREW.PUMP SLACK FORWARD.PUT ,INJECTOR OVER BUNG HOLE.PJSM REGARDING WORKING ON PUMP 2.LOTO PUMP 2.INSTALL PUMP 2 SCREEN.ADD SAFE LUBE TO PITS. 8/20/2015 100:00 - 01:05 1.08 PULL N DPRB DECOMP CONTINUE TO INSTALL PUMP SCREEN INTO PUMP 2.UNLOCK PUMP 2.LINE UP PUMPS TO KILL WELL.OPEN WELL 150PSI WHP. 01 05 - 01 30 0.42 CLEAN N DPRB DECOMP :KILL VVELL VVITH 8.4PPG FLUID.PUMP AT 6.28PM.MAX PRESSURE OF 150PSI WHP. PUMP TOTAL OF 170BBLS.STOP PUMPING, WELL ON VAC.SPLIT PUMPS.LINE UP TO PUMP DOINN KILL LINE VVITH PUMP 1. 01 30 - 01:40 0.17 CLEAN P DECOMP PJSM REGARDING MU FCO BHA. 01:40 - 02:20 0.67 CLEAN' P DECOMP MU FCO BHA.PU INJECTOR&STAB ONTO WELL.POWER UP&TEST TOOLS.TEST QTS 250PS1/4000PSI.SET COUNTERS.OPEN EDC. 02:20 - 04:00 1.67 CLEAN P DECOMP I RIH WITH FCO BHA#4.PUMP 8.3PPG W/ SAFELUBE FLUID 1BPM DOWN KILL LINE. PUMP 2BPM/1157PSI DOWN COIL.OPSI WHP. 04 00 - 04:25 0.42 CLEAN P DECOMP LOG DOWN FOR TIE-IN FROM 8940FT. CONTINUE TO PUMP 1BPM DOWN KILL LINE& 2.2BPM/800PSI DOWN COIL OPSI WHP.PLUS • 4FT CORRECTION.SHUT DOWN COIL PUMPS &CLOSE EDC.RESUME PUMPING DOWN COIL,2.16BPM/975PSI. 04.25 - 05 25 1.00 CLEAN P DECOMP RIH,CIRC AT 2.68BPM/1750PSI-CLEAN&DRY TAG TWICE AT 10371FT.CLEAN UPTO 10330FT.RIH&TAG AT 10371FT. 05.25 - 05 50 0.42 CLEAN P DECOMP LOG CCL UP FROM 10369FT TO 10000FT. 'PUMP 2BPM DOWN COIL/894PSI&1BPM/OPSI DOWN KILL LINE. 05:50 - 07:00 1.17 CLEAN P DECOMP RIH TO 10300FT. PERFORM PUMPING PRESSURE DIAGNOSTICS AS PER OCN#7. 07 00 - 09:20 2.33 CLEAN P DECOMP •POOH. PUMP 1 BPM EACH DOWN CT AND KILL LINE WHILE POOH. 09 20 - 10:15 0.92 CLEAN N DPRB DECOMP STOP AT 100 FT,LINE UP BOTH PUMPS ON THE KILL LINE PUMP 170 BBLS/30 MIN SEAWATER. PERFORM PJSM FOR CHANGE OUT BHA WHILE BULLHEADING. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 10 0> Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) • (usft) 10:15 - 11:00 0.75 CLEAN P DECOMP TAG STRIPPER. DIAL IN 1 BPM DOWN THE KILL LINE. ALLOW THE PITWATCHER 10 MIN TO GETA STABLE KILL LINE RATE INSTEAD OF A FLOWCHECK. AFTER PITWATCHER IS SATISFIED WITH RATE HE INFORMS DRILLER,OK TO BREAK INJECTOR. • REMOVE INJECTOR AND PULL ASIDE. CONDUCT KICK DRILL,PITWATCHER CALLS i DRILLER AND INFORMS HIM THE KILL LINE PUMP JUST WENT DOWN. j DRILLER SECURES WELL AS PER STANDING ORDERS,PULLS BHA OUT AND SIMULATES -CLOSING BLIND RAMS. j WELL SECURE IN 1 MINUTE. CONTINUE BHA CHANGE,MILL IS 3.79 NO-GO, NO WEAR. I PICK UP BHA#5,-DRIFT ASSEMBLY. _ BHA OAL=61:29 FT. 11:00 - 13:40 2.67 CLEAN P DECOMP I M/U RISER AND PT QTS,READY BHI TOOL FOR RIH. j RIH BHA#5. 'TIE-IN DEPTH,CORRECT+4 FT. TAG 10373 FT. 1340 - 15 00 1.33 CLEAN P j DECOMP POOH WITH DRIFT BHA. PUMP 1.1 BPM KILL LINE/1.1 BPM DOWN CT. BLEED OOA FROM 450 PSI TO 120 PSI. • CONTINUE POOH. _ 15:00 - 17:30 2.50 CLEAN N SFAL • DECOMP 'LEAK SEEN ON INJECTOR. STOP POOH AND INVESTIGATE. LEAK IS ON INJECTOR HIGH PRESSURE PIPING,SLB MOBILISE MECHANICS FROM 'DEADHORSE. • i I PJSM WITH DRILLER AND SLB SUPERVISOR I FOR CLOSING BOPS. i CLOSE UPPER PIPE/SLIP RAMS. MANUALLY LOCK RAMS. PUMP 1 BPM DOWN KILL LINE INTO WELL WHILE REPAIR TAKES PLACE. PERFORM LO/TO OF POWER PACK AND SCRS FOR REPAIR. 17:30 - 18:30 1.00 CLEAN P ' DECOMP I POOH.PUMP 1 BPM/OPSI DOWN KILL LINE. PUMP 1.25BPM/425PSI DOWN COIL.PJSM REGARDING KILLING WELL WHILE POH. 18:30 - 19:10 0.67 CLEAN N DPRB DECOMP :KILL WELL.3BPM/OPSI DOWN KILL LINE. 3BPM/1400PSI DOWN COILTHRU EDC. 19:10 - 20:20 � 1.17 CLEAN P i DECOMP !PJSM REGARDING LD BHA&MU WHIP STOCK BHA.PU INJECTOR&STAB ONTO WELL. POWER UP&TEST TOOLS.TEST QTS '250PSI/4000PSI.OPEN EDC.SET COUNTERS. 20:20 - 22:50 2.50 WHIP P WEXIT RIH.PUMP 1BPM/OPSI DOWN KILL LINE. j PUMP 0.75BPM/8OPSI DOWN COIL.AT 8400FT,REDUCE TO 0.5BPM/OPSI DOWN KIL LINE&1.5BPM/271PSI DOWN COIL TO FILUCATCH FLUID IN COIL,KEEPING RATE LESS THAN 2BPM PAST PACKER WS. 22:50 - 23:50 1.00 WHIP WEXIT LOG DOWN FOR TIE-IN FROM 8950FT.PUMP j t 0.5BPM/OPSI DOWN KIL LINE&1.5BPM/250PSI DOWN COIL.PUH&RE-LOG. PLUS 36FT j I CORRECTION.. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 11 0. 3' Operation Summary Report Common Well Name:14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C:(2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active datum:42.90GL+28.5KB @71.40usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:50 - 00:00 0.17 WHIP P I WEXIT CONTINUE TO RIH.PUMP 0.5BPM/OPSI DOWN KIL LINE&1.5BPM/250PSI DOWN COIL. 8/21/2015 00:00 - 00:40 0.67 WHIP P WEXIT CONTINUE TO RIH.PUMP 0.5BPM/OPSI DOWN KIL LINE&1.5BPM/250PSI DOWN COIL.WT CHECK AT 10315FT,46K,RIW=28K. ORIENTATE 45LOHS.TAG AT 10371 FT.PUH TO 00:40 - 00:45 0.08 WHIP P WEXIT CLOSE EDC.SET WS WITH TOP AT 10345FT.- 1100PSI TO SHEAR.SET 4K DOWN. 00:45 - 02:50 2.08 WHIP P WEXIT POH.ROUTE RETURNS TO TT WHILE FILLING HOLE/POH.PUMP 1.64BPM/OPSI DOWN KIL LINE 1.5BPM/194PSI DOWN COIL.CLOSE CHOKE,8OBBLS PUMPED STILL NO RETURNS.PUMP 1.0BPM/OPSI DOWN KIL LINE&1.5BPM/250PSI DOWN COIL WHILE POH. 02:50 - 03:20 0.50 KILLW N DPRB WEXIT KILL WELL.3BPM/OPSI DOWN KILL LINE. 3BPM/2500PSI DOWN COIL THRU TOOL. PJSM REGARDING HANDLING BHA WHILE KILLING THE WELL.REDUCE RATE TO IBPM/OPSI DOWN KILL LINE. 03:20 - 04:40 1.33 WHIP P WEXIT POP OFF WELL.BREAK OFF TOOL.PLACE INJECTOR OVER BUNG HOLE.STAND BACK BHI COIL TRAC TOOL.LD XO.LD WHIP STOCK SETTING BHA.OFF LOAD SAME.HOIST BOT 1 EXTREME MUD MOTOR TO RF&DIAL UP TO 1 DEGREE AKO.MU WINDOW MILLING BHA. PU INJECTOR&STAB ONTO WELL.POWER UP& TEST TOOLS.TEST QTS 250PSI/4000PSI. OPEN EDC.SET COUNTERS. 04:40 - 06:30 1.83 WHIP P WEXIT RIH.PUMP 1BPM/OPSI DOWN KILL LINE. PUMP 0.75BPM/80PSI DOWN COIL. 06:30 - 07:00 0.50 WHIP P- WEXIT TIE IN DEPTH FROM 8950 FT. 07:00 - 08:30 1.50 WHIP N SFAL WEXIT GR MARKERS NOT SEEN,PICK UP TO 8850 FT AND RE-LOG. CORRECT+59 FT. CONTINUE RIH. 08:30 - 09:20 0.83 WHIP N SFAL WEXIT TAG AT 10324 FT,ABOUT 20 FT HIGH. PICK UP AND DIAGNOSE DEPTH CONTROL ISSUES. RE-CHECK GR CORRELATION,OK. PICK UP AND CHECK MANUAL COUNTER AGAINST CTDS DEPTH,READINGS DIVERGE 6 FT AFTER POOH 1200 FT. 09:20 - 11:00 1.87 WHIP N SFAL WEXIT CHANGE OUT DEPTH ENCODER. 11:00 - 12:30 1.50 WHIP N SFAL WEXIT TIE-IN DEPTH FROM 8860 FT. CORRECT+20 FT. TAG WHIPSTOCK AT 10338 FT. 12:30 - 14:00 1.50 STWHIP P WEXIT START TIME MILLING WINDOWAT 10337.0 FT. 34-0/4 PUMP 2.6 BPM DOWN CT FROM TRUCK, CURRENTLY ROUND TRIPPING 5 TRUCKS. 14-1k13 PUMP 1 BPM DOWN CT ANNULUS VIA KILL LINE FROM PITS,MONITORED FROM PVT ISTRAPS. 14:00 - 16:30 2.50 STWHIP P WEXIT CONTINUE MILLING WINDOW AT 10337.8 FT. MILLING SLOWLY TO TRY AND KEEP THE BENT MOTOR ON THE RAMP AS LONG AS POSSIBLE. MILL TO 10338.70 FT. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 124-23 Operation Summary Report Common Well Name: 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date:8/27/2015 X3-0172J-C (2,993,246.40) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA I UWI:500292052900 Active datum:42.90GL+28.5KB©71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations _ (hr) (usft) 16:30 - 23:35 7.08 STWHIP P WEXIT CONTINUE MILLING FROM 10338.7 FT.PUMP 8.3PPG SEAWATER AT 1 BPM/OPSI DOWN KILL LINE.PUMP 8.3PPG SEAWATER AT 2.6BPM/1721 PSI DOWN COIL. MILL WINDOW AT 1 FT/HR.7.52PPG ECD. PUMP 290BBLS OF VISCOSIFIED FLUID DOWN COIL-NO CHANGE IN RETURNS. POSSIBLE EXIT AT 10343FT. 23:35 - 00:00 0.42 STWHIP P WEXIT MILL 9FT OF RAT HOLE FROM 10344FTAT 10-30FT/HR. PUMP 8.3PPG SEAWATER AT 1BPM/OPSI DOWN KILL LINE.PUMP 8.3PPG SEAWATER AT 2.68BPM/1521 PSI DOWN COIL. 8/22/2015 00:00 - 01:00 I 1.00 STWHIP P WEXIT I CONTINUE TO MILL RAT HOLE FROM 10344FT AT 10-30FT/HR. 'PUMP 8.3PPG SEAWATER AT 1BPM/OPSI 1 DOWN KILL LINE.PUMP 8.3PPG SEAWATER AT 2.68BPM/1521 PSI DOWN COIL. MILL TO 10354FT. 02:30 1.50 STWHIP P WEXIT 01:00 ,DRESS WINDOW AT 1 FT/MIN,3 TIMES UP/DOWN.PUMP 8.3PPG SEAWATER AT 1 BPM/OPSI DOWN KILL LINE.PUMP 8.3PPG •SEAWATER AT 2.68BPM/1521 PSI DOWN COIL. DRY DRIFT WINDOW-CLEAN. 02:30 - 04:30 2.q0 STWHIP P WEXIT POH.PUMP 8.3PPG SEAWATER AT 1 BPM/OPSI DOWN KILL LINE.PUMP 8.3PPG SEAWATER AT 1.53BPM/350PSI DOWN COIL. 04:30 05:00 0.50 KLUX---- N DPRB WEXIT KILL WELL.3BPM/OPSI DOWN KILL LINE. 3BPM/2250PSI DOWN COIL THRU TOOL. PJSM REGARDING HANDLING BHA WHILE KILLING THE WELL.REDUCE RATE TO 1 BPM/OPSI DOWN KILL LINE. 05:00 - 05:30 0.50 STWHIP P WEXIT PUMP 8.3PPG SEAWATER AT 1 BPM/OPSI DOWN KILL LINE.POP OFF WELL.BREAK OFF I TOOL.PLACE INJECTOR OVER BUNG HOLE. LD BHI COIL TRAC TOOL.MILLS WERE 3.79" NO-GO. 05:30 - 06:00 0.50 BOPSUR P PROD1 SD KILL LINE PUMP.SHUT IN WELL.PU TEST JOINT.PERFORM WEEKLY BOPE FUNCTION • TEST USING RIG FLOOR PANEL.LD TEST JOINT.INSTALL NITE CAP.OPEN WELL.PUMP 8.3PPG SEAWATER AT 1 BPM/OPSI DOWN KILL • I LINE. 06:00 - 07:20 1.33 DRILL N DPRB PROD1 POSITIVE WHP ABOUT 5 PSI AFTER BEING SHUT IN ABOUT 30 MIN FOR FUNCTION TEST. NOTIFY ODE AND CTD SI. PUMP 170 BBLS/6 BPM WELL ON VAC. 07.20 - 08:20 1.00 DRILL N WAIT PROD1 CONTINUE FILLING 1 BPM,WAIT FOR HARDLINE CREW TO COME OUT AND INSTALL PUMP IN MANIFOLD FOR NEXT BOP TEST. 08'20 - 08:40 0.33 DRILL P PROD1 PJSM FOR M/U BHA. SHORT CHAIN TOP PORTION OF BHA,M/U BIT TO MOTOR. 08:40 - 10:20 1.67 DRILL I C • PROD1 HARDLINE CREW ARRIVES,REVIEW JSAAND INSTALL PUMP IN SUB. PT 4250 PSI,GOOD. 10:20 - 11:00 0.67 DRILL P PROD1 I PJSM THEN M/U BUILD BHA#8. VERIFY FILL RATE WITH PITWATCHER. 1.76 DEG ULS MOTOR WITH 3.75 X 4.25 HCC • BIT,RES INCLUDED. • BHA OAL=80.43 FT. Printed 9/15/2015 10:20:01AM North America-ALASKA-BP Page 1342.2': ..:k ., .. ,.n....-., yac..i.x. -... ,, ..,,,w r`...pb'' '. ''<.:f: ..,... :, b nl.'St ' r <✓ :lx#/P`�."`> A ,x r„ -✓,." ." .. . ,..."`+Y6 ., '^l.'sR 5'sA.*k' ."-:,x ....rwr;%sivWr'k+.`aw Operation Summary Report Common Well Name 14-11 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/15/2015 End Date.8/27/2015 X3-0172J-C:(2,993,246.40) Project Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:9/4/2015 Rig Contractor:NORDIC CALISTA UWI 500292052900 Active datum:42.9OGL+28.5KB @71.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 13:50 2.83 DRILL P PROD1 RIH WITH BHA#8. PUMP 1 BPM DOWN KILL LINE,1.9 BPM 1 DOWN CT WHILE RIH. STOP AT 8700 FT,DEPTH APPEARS OFF. PARAFIN LIKE MATERIAL OFF THE CT IS COATING THE DEPTH ENCODER WHEEL, INCREASING ITS DIAMETER SLIGHTLY AND THROWING OFF THE DEPTH MEASURE. TIE-IN DEPTH,CORRECT+135 FT. 13:50 - 14:30 0.67 DRILL N DPRB PROD1 DISCUSS DEPTH ISSUES WITH ODE,GEO AND BHI. 'DECIDE TO TIE-IN DEPTH CLOSER TO TD [THEN DRILL PAST THE RA AND RE-LOG TO TIE-IN THE RA. DISCUSS WITH MI ENGINEER GETTING DEEP CLEAN PRODUCT OUT TO HELP KEEP THE PIPE CLEAN COMING OOH. TIE-IN DEPTH FROM 10030 FT. CORRECT+6 FT. 14 30 - 15:20 0.83 DRILL P PROD1 RIH,CLOSE EDC. LOG DOWN FROM 10325 FT TO TD. FIND TD AT 10365 FT. PICK UP IS CLEAN 43K. 15:20 - 23.25 8.08 DRILL P PROD1 DRILL FROM 10364 FT AT 55 DEG INCLINATION. I ROP 0-50 FT/HR WITH 1-5K DWOB PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 1BPM/OPSI DOWN KILL LINE.PUMP 8.5PPG '3%KCL W/0.6%SAFELUBE AT 3.00BPM/2400PSI DOWN COIL. FREE SPIN IS-2000PSI W/-500PSI MW. ECD=7.45 PPG. j PUMP 10BBL SWEEPS OF 8.5PPG DRILLING MUD DOWN BACKSIDE AS NEEEDED. DRILL TO 10440FT. 23:25 - 23:30 0.08 DRILL P PROD1 WIPER TO THE WINDOW. PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 1BPM/OPSI DOWN KILL LINE.PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 3.00BPM/2400PSI DOWN COIL. 23:30 - 00:00 0.50 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 10287FT. PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 1BPM/OPSI DOWN KILL LINE.PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 0.7BPM/2400PSI DOWN COIL IN OPEN HOLE& NO PUMP RATE ACROSS WS. 8/23/2015 00 00 - 01:15 1.25 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 10300FT.TAG AT 10357FT.PICK UP&WORK THROUGH WS- CLEAN.RE-LOG. PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 1BPM/OPSI DOWN KILL LINE.PUMP 8.5PPG 3%KCL W/0.6%SAFELUBE AT 0.7BPM/2400PSI DOWN COIL IN OPEN HOLE& NO PUMP RATE ACROSS WS. !+1 FT CORRECTION. "'CORRECTED TOP OF WINDOW IS 10350'. Printed 9/15/2015 10 20 01A _ _ T� F7�AC 11VaLHEAD= GRAY 1 -11 A _ATTY NOTES: WELL ANGLE>70°@ 10459'"• CHROME TBG""DEPLOY SLEEVE@ 10098'(18' ACTUATOR= BAKER C Ll OKB-ELEV= 71' SHALLOWER PER MEM GR/CCL LOG ON 04/17/111'' BF.ELEV= Li KOP= 5200' "CONDUCTOR H ? Max Angle= 91'@ 11610 I 2221' 4-1/2"HES X NP,D=3.813' Datum k/D= 10406 —#' ' Datum ND= 8800'SS D=—. GAS LFT MANDFi�S 13-3/8"CSG,72#,L-80 R3 BTC,D=12.347" —1 2651' ST MD ND DEV TYPE VLV LATCH PORT DATE q vi 5 3166 3166 1 KGB-2 DMY BK 0 04/14/15 ESTIMATED TOC(TACK) —+ —3150 ��4 * 4 4743 4743 0 KGB-2 DMY BK 0 04/14/15 1l4, �* 3 6112 6021 33 KGB-2 DMY BK 0 08/15/10 7'TK CSG,47#,L-80 TC11 XO TO L-80 BTC — 360T .4 �' 2 7320 7004 44 KGB-2 OMY BK 0 04/13/10 Minimum ID = 2.370" 10117' 44 • 1 8822 8004 57 KGB-2 DMY BK 0 04/13/10 @ /.44 4� 3-1/2" X 2-7/8" LINER XO 4 •� 6930'-6936• H7"BKR PORTED TEBACK SEAL ASSY,D=6.16" 'v , 'e 6930' 7"X 9-5/8"BKR C-2 ZKP LTP,I)=6.28" 7"TRK CSG,26#,L-80 BTC-M, -L 6929' — .0383 bpf,D=6.276' a —{ 6945' H9-5/8"X 7" BKR HMC LNR HGR,D=6.29" 9-5/8'CSG,47#,L-80 BTC(NIKON),D=8.681' —I —7109 — 9-5/8'MLLOUT WNDOW(14-11A) 7109'-7125' ' 10067' H4-1/2-HES X NP,D=3.813" '- '- 10088' H 7"X 4-1/2"BKR S-3 PKR,D=3.875" ' 10111' —4-1/2'HES XNP,ID=3.813" 10130' —Ir X 5"BKR ZXP LTP w/DESK SLV,D=4.41' 4-1/2"TBG,12.6#,13CR-80 VAM TOP, H{ 10143' , i 10131' H4-112"HES XN NP,D=3.80'(MLLED 08/03/10) .0152 bpf,D=3.958' (a A 10143' H4-1/2"WLEG,D=3.958" 7'LNR 26#,L-80 BTC-M,.0383 bpf,D=6.276' -H 10330' \ 10152' —7'X4-112'BKR HMC LNRHD GR, =4.41' 10159' —5'X 4 12'XO, D=3.96' 4-1/2"WHPSTOQC(08/21/15) —I 10350' , 2-718"JET CUT LNR(07/11/15) —J 10360' 4-1/7 MONOBORE WHPSTOCK(08/19/10) —1 10370' PERFORATION SU OAARY 4-1/T MLLOUT WINDOW(14-11AL1) 10368'-1037T REF LOG: SF1Y SUN MWD DGR 08/29/05 ANGLE AT TOP PERF: @ III. , Note:Refer to Production DB for historical perf data - \ SIZE SPF INTERVAL N5 SHOT SQZ \ 14-11A I I \ \ 2-718' 6 10325-10328 0 03/21/10 2-7/8• 6 10328-10348 0 03/21/10 4-1/2" SLID 10412-10650 0 09/14/05 1 [PBTD 1 11785' 4-1/T SLID 11146-11802 0 09/14/05 \ 14-11AL1 111 \ 2-7/r SLID 10617-11172 0 08/25/10 I \ . } 2-7/8" SLTD 11417-11785 0 08/25/10 2-7/8'LNR,6.16#,L-80 SR, 11818' Ali- 00" +4'.4'" .0058 bpf,D=2.441' 4-1/2'LNR 12.6#,L-80 BTC/BT-M, —1 11804' •�•�••4 .0152 bpf,ID=3.958' DATE REV BY COM BUTS DATE REV BY COPD TS PRUDHOE BAY U'IT 08/04/81 PKR 191 ORIGINAL COMPLETION 09/04/14 WKWJMD PALL LATCH(08/30/14) WELL: 14-11A 09/15/05 N2ES SIDETRACK(14-11A) 04/22/15 JLS/JMD GLV C/O(04/14/15) PERMT No: 2051260,2100940 08/25/10 NORDIC 2 CTD SIDETRACK(14-11AL1) 07/11/15 GPM PJC JET CUT 2-7/8"LMR AR No: 50-029-20529-01,(60) 09/19/10 MK/PJC FINAL DRUG CORRECTIONS 07/21/15 PJC REFORMAT-PRE RIG CLEANUP SEC 9,T10N,R14E,1776'FPL&'1760'FEL 04/23/11 MSS/PJC SET LTP SNAP LATCH(4/18/11) 09/01/15 TR/JPVD REMOVED LW/SET WS 11/06/13 TMJfuD CORRECTED MN D BP Exploration(Alaska) ti of � ew \�V/j, s THE STATE Alaska Oil and Gas °fAT 4 AS KA. Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 GOVERNOR BILL WALKER 9 Main. 907.279 1433 OF ALAS' Fax: 907 276 7542 www.aogcc alaska.gov SCANNED JUN 0 1 2.0 15 John McMullen O LJ. Engineering Team Leader I J BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-11 AL 1 Sundry Number: 315-290 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision,or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy `. Foerster Chair DATED this 2 day of May, 2015 Encl. STATE OF ALASKA ,,,,,� ALAb,.�-,OIL AND GAS CONSERVATION COMM..,SION R c ,,, a 1 - F0 APPLICATION FOR SUNDRY APPROVAL MIV 12 20i:-3 20 AAC 25.280 S i �Rs' 1. Type of Request: r ❑Abandon • ®Plug for Redrill El Perforate New Pool ❑ Repair Well El Change Approved Progrraat ❑Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension ❑Operations Shutdown ❑Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. 0 Exploratory ❑Stratigraphic 210-094 3. Address: 6. API Number e,Alaska 99519-6612 ®Development ❑Service P.O. Box 196612,Anchorage, 50.029-20529-60-00 ' 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 14-11AL1 • Will planned perforations require a Spacing Exception? 0 Yes No 9. Property Designator 10. Field/Pool(s): ADL 028312 • Prudhoe Bay Field/Prudhoe Bay Oil Pool - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD (ft): Plugs(measured): Junk(measured) 11818' ' 8962' • 11818' ' 8962' • None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 31'- 111' 31'- 111' 1530 520 Surface 2621' 13-3/8" 30'-2652' 30'-2652' 4930 2670 Intermediate 7081' 9-5/8" 28'-7109' 28'-6843' 6870 4760 Production 10304' 7" 26'- 10330' 26'-8828' 7240 5410 Liner 239' 4-1/2" 10130'- 10369' 8714'-8850' 8430 7500 Liner 1702' 2-7/8" 10116'- 11818' 8714'-9032' 13450 13890 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft). Slotted Liner: 10617'- 11785' Slotted Liner:8910'-8962' 4-1/2", 12.6# 13Cr80 10145' Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV 10090'/8691' MD(ft)and TVD(ft): 12. Attachments 13.Well Class after proposed work' ®Description Summary of Proposal 0 BOP Sketch El Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15. Well Status after proposed work. Commencing Operation' July 1,2015 0 Oil El WINJ ❑WDSPL 0 Plugged 16. Verbal Approval: Date 0 Gas ❑GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG El SPLUG ®Suspended 17. I hereby certify that the fore•oing is true and correct to the best of my knowledge. Contact: Nathan Sperry,564-4258 Printed Name: John ' ,iIarAf/ Title: Engineering Team Leader Email- Nath n.Sperrya@bp.com Signature ' / Phone: 564-4711 Date: ij if /5-- Commission Use Only Conditio . of-•proval: Notify Commission so that a representative may witness Sundry Number: ?'`5 - 2Cj ❑Plug Integrity IS BOP Test 0 Mechanical Integrity Test 0 Location Clearance Other: &D,n tz'S7` 7L-o 2.5-c;c7 ps; (N1p5P 1`5 2 'ffZ psi ftkv7VIa ✓ 19✓e-✓l.-I1'tr tt5 /fio aSoc2p5 ,• \ A-1 t —n Ct tc /D l V- p I c;t«�,c� t a/ p ro ✓c ci p r-r zo%}ftG 25. 7 /zC L J Spacing Exception Required? 0 Yes LLQ No Subsequent Form Required. /c _ 4 c - 7. , / APPROVED BY ^� Approved By: C�_ COMMISSIONER THE COMMISSION Date:5---2-7—/-c— Form 'Z/—/� Form 10-403 Revised 1 /2012 OrR1at11 i a d for12 months from the date of a royal Submit In Duplicate RBDMS% MAY 1 8 10150'1'./4--/� To: Alaska Oil & Gas Conservation Commission • From: Nathan Sperryr (0)y (0 CTD Engineer Date: May 8th, 2015 Re: 14-11A Sundry Approval Sundry approval is requested to plug the 14-11A and 14-11AL1 perforations and slotted liner as part of the drilling and completion of proposed 14-11B coiled tubing sidetrack. History and current status: 14-11A was a Zone 4 producer drilled and completed in 2005. The 14-11AL1 Zone 4 lateral was added in 2010. The 14-11AL1 leg encountered several faults that brought water into the parent well and made the laterals uncompetitive. All wellwork options have been exhausted and the well is no longer competitive. Proposed plan: 14-11B will exit from well 14-11A by the Nordic 1 Coiled Tubing Drilling rig on or around August 1st, 2015. The 14-11 B sidetrack will exit through the existing 4-1/2" liner and kick off in the Shublik, and target Zone 4 reserves. The proposed sidetrack is a -2,600' horizontal Ivishak Zone 4 producer, which will access a —33 acre reserves target off of drillsite 14. The lateral will be completed with a 3-1/2" X 3-1/4"X 2-7/8" chrome liner which will be fully cemented and perforated. This Sundry covers plugging the existing 14-11A and AL1 perforations and slotted lienr via the 14-11 B liner cement job or a liner top packer set post rig with slick line if liner lap test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. . celer,'0, to t.'1/dof rte /ctriai the /4 74f--- well V Icif /f 0 BO P,D w ` c 95w�/.c. 0v/7 Iffer p iu feral god ,0A dropfe, 70 < JO/of/ q wi ,-- Or/� e t(c,e / off ?,7%). 14 f bt•e tl 141 kid' /Ptit votive_ r5 cure/1T hortoM4o/e /0ce`0', ((u,, y i-4, wc// ��ov od a1/ow Cor ;Prave1 1eCOv �Gl -fir `��� : � � pD�t� Oft D-¢ rhe pc Pre-Rig Work(scheduled to begin July 1St, 2015) 1. E Cut existing 2-7/8"AL1 liner at the window. 2. C Catch and release liner. 3. V Pre-CTD tree work. 4. V Set TWC. 5. 0 Remove wellhouse and level pad. Rig Work(scheduled to begin August 1st, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,442 psi) 2. Pull TWC. Bullhead kill well. 3. Fish liner. 4. Drift and caliper to 10,370' MD. 5. Set 4-1/2" packer WS at 10,350' MD 45 deg LOHS. 6. Mill 3.80"window and 10' of rathole. 7. Drill build: 4.25" OH, 340' (20 deg DLS planned). 8. Drill lateral: 4.25" OH, 2,260' (12 deg DLS planned). 9. Run 3-1/2" x 3-1/4"X 2-7/8" Chrome liner leaving TOL at—10,095' MD. 10. Pump primary cement job: 33 bbls, 15.8 ppg, TOC at TOL* 11. Perform liner cleanout and GR/CCL log. 12. Perform liner lap test to 2,400 psi 13. Perforate liner based on log interpretation (-500'). 14. Freeze protect well to 2,500' MD. 15. Set TWC; RDMO. Post-Rig Work 1. 0 Re-install wellhouse, flow line and pull TWC 2. S Set 45KB liner top packer if needed * 3. S Set GLV's *Approved alternate plug placement per 20 AAC 25.112(i) Nathan Sperry CTD Engineer 564-4258 CC: Well File Joe Lastufka TREE= FMC V1A LLHEAD= GRAY 14-1 1 A CHROMNOTES: TBG DEPLOY SLE VE@ 10098'(_ 18' ACTUATOR= BAKER C L 1 OKB.BEV= 72' SHALLOWER PER MEM GR/CCL LOG ON 04117/111'n" BEE.EV= KOP= 5200' Max Angle= 91" a@ 11610' I I 2221' H4-112"HES X NP,D=3.813" Datum MD= 10406 Datum ND= 8800'SS 3150' HEST TOP OF TIEBACK CMT 13-3/8"CSG,72#,L-80,D=12.347" 2651' GAS LFT MANDRELS Ivi . ft. ST MI ND DEV TYPE VLV LATCH PORT DATE 1 I # 5 3166 3166 1 KGB-2 00tvE BK 16 08/31/10 VI I I Minimum ID =2.370" @ 10117' 1. .• 4 4743 4743 0 KGB-2 SO BK 20 08/31/10 3-1/2" X 2-718" XO � 1. I� �. 3 6112 6021 33 KGB-2 DMY BK 0 08✓15/10 1.11 1* 2 7320 7004 44 KGB-2 DMY BK 0 04/13/10 111 1' 1 8822 8004 57 KGB-2 DMY - BK 0 04/13/10 11.1 • 1 • 11/ 1 6930' —17"BKR PORTED TRACK SEAL ASSY,D=6.16" 7"TIEBACK CSG,26#,L-80 — 6930' 1 6930' —17"X 9-518"BKR C-2 ZKP LIP,D=6.29" TC-IVBTC-M,D=6.276" 1111 — 6945' H9-5/8"X 7" BKR HMC LNR HGR,D=6.276" 9-5/8"CSG,47#,SOO-95 BTC,D=8.681" —{ 7109' I— 9-5/8"MLLOUT WINDOW(14-11A) 7109'-7125' ' ' 10067' —I4-1/2"HES X NP,D=3.813" 10088' H7"X 4-1/2"BKR S-3 PKR,D=3.875" 10116' H3-1/2"DEPLOY SLV,ID=2.970"(SEE SAFTEY NOTE) Uri 10111' H4-1/2"HES X NP,D=3.813"(B&IND LPI 1011T H3-1/2"X 2-7/8"LNR XO,D=2.370" — 10130' I' X 5'BKRZXPLTPw/TEBK SLV,D=4.41" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, —I 10143' ' I 10131' —4-1/2"HES XN NP,ID=3.80"(MLLED 08/03110) .0152 bpf,D=3.958" `_ 10143' H4-1/2"WLEG,D=3.958" BEHIND 7"LNR,26#,L-80 BTC-M, — 10330' CT LNR .0383 bpf,D=6.276" 1 10152' --{7"X 4-1/2"BKR HMC LNR HGR,D=4.41" 4-1/2"MONOBORE WHIPSTOCK(08/19/10) — 10370' , 10159' —f 5"X 4-1/2"XO, D=3.96" PERFORATION SUMMARY RE=LOG: SPERRY SUN MVVD DGR 08/29/05 4-1/2"MLLOUT WINDOW(14-11AL1) 10369'-10377' ANGLE AT TOP PERF: @ Note:Refer to Production DB for historical perf data IIII , SZE SPF MBRVAL Opn/Sgz SI-OT SOZ 14-11A \ 2-718" 6 10325- 10328 0 03/21/10 I \ 2-7/8" 6 10328- 10348 0 03/21/10 \ 4-1/2" SLTD 10412- 10650 0 09/14/05 I I \ 4-1/2" SLID 11146-11802 0 09/14/05 PBID 11785' 14-11AL1 \ 2-7/8" SLID 10617- 11172 0 08/25/10 1411A \ \ 2-7/8" SLID 11417- 11785 0 08/25/10 I PIL1 I I 4'�i�ai, 2-7/8"LNR,6.16#,L-80 STL, 11818' s�, 4-1/2"LNR,12.6#,L-80 BTC/BT-M, —I 11804' j *AV, .0058 bpi,D=2.441" .0158 bpf,D=3.958" :::.: DATE REV BY COMMENTS DATE REV BY COMENTS PRUDHOE BAY UM' 08104/81 PKR 191 ORIGINAL COMPLETION 09/19/10 MVPJC FINAL DRLG CORRECTIONS WELL: 14-11A 09/16/05 N2B3 SIDETRACK(14-11A) 04/23/11 MSS/PJC SET LTP SNAP LATCH(4/18/11) PERMIT No: 2051260,2100940 08/26110 NORDIC 2 CTD SIDETRACK(14-11AL1) 11/06/13 TMIJM3 CORRECTED MND AR No: 50-029-20529-01,(61) 08/29/10 PJC DRLG DRAFT CORRECTIONS 09/04/14 WKP/JMO PULL LATCH(08/30/14) SEC 9,T1ON,R14E,1760'FEL&1776'FPL 09/01/10 CSR/PJC'PERF CORRECTIONS 09/01/10 JLJ/AGR GLV C/O(08/31/10) BP Exploration(Alaska) TREE= FMC W1ELLH64D= GRAY 14-11A NOTES: WELL °ESL 0018 ACTUATOR= BAKER L 1 ----------- SHALLOWER PER MEM GRI CCL LOG ON 04/17111)"" ' oKB-aEv= 77 BF:ELEV= --------_ KOP= — 5200' Max Angle= 91°011610' ' 2221' —4-1/2"HIS X NP,D=3.813" Datum MD= 10406 Datum TVD= 8800'SS 3150' —{EST TOP OF TEBACK CMT 13-3/8'CSG,72#,L-80,ID=12.347" --I 2651' GAS LFT MANDRELS •1 V. ST MD ND Del/ TYPE VLV LATCH PORE DATE ►444 •� 5 3166 3166 1 KGB-2 DAN BK 0 04/14/15 • Minimum ID =2.370" @ 10117' 111 . 4 4 4743 4743 0 KGB-2 DMY BK 0 04/14/15 3-112"X 2-7/8"XO ► 4 41 3 6112 6021 33 KGB-2 OW BK 0 08/15/10 I. +, 2 7320 7004 44 KGB-2 DMY BK 0 04/13/10 1 a 1 8822 8004 57 KGB-2 MY BK 0 04/13/10 111 w 6930' —7"BKR PORTED TEBACK SEAL ASSY,D=6.16" i./ .4. 7"TIEBACK CSG,2E4,L-80 — 6930' 1 1 6930' Hr X 9-5/8'BKR C-2 ZKP LIP,D=6.29" TC-IVBTC-M,D=6.276' I ---L 6946' —{9-5/8"X 7' BKR HMC LNR FUR,D=6.276" F9-5/8'CSG,47#,S00-95 STC,ID=8.681" — 7109' — 9-5/8"FALLOUT 1MNDOW(14-11A) 7109'-7125' I 10067' —I4-12"HES X NP,D=3.813' , 10088 -17"X 4-1/2"BKR S-3 FKR 13=3.875" I 10116' 3.70"CEPLOY SLV,D=2.970"(SE=SAFTEY NOTE) 10111' 4-1/2"FES X NP,D=3.813"(BMW LNR) 10117" —3-1/2"X 2-7/8"LNR XO,13=2.370' ---- ---- I 10130' I—17'X 5"BKR ZXP LTP w fIEBK SLV,D=4.41" 41/2"TBG,12.611,13CR 80 VAM TOP, — 10143' ' 10131' --I4-12'HES XN NP,U=3.80"(MILL®08/03/10) .0152 bpf,ID=3.958' 10143' H4-12"WLEG,D=3.958' BEHIND 7"LNR 26#,L-80 BTC-M, H 10330' i S10162' 'HT X 4-1/2"BKR HMC LNR HGR,D=4.41" 'CT LNR .0383 bpf,D=6.276' 41/2'MONOBORE WHPSTOCK(08/19/10) -I 10370' 10159' —Iv'X 4-12"XO, D=3.96' PERFORATION SUASAARY REF LOG: SPE2RY SUN MIND DGR 08/29/05 I 4-1/2"PALLOUT WINDOW(14-11AL1) 10369'-10377 I ANGLE AT TOP PERF: 0 ‘ Note:Refer to Production DB for historical pert data III Est. cut depth at TOWS. RA tag SEE SPF INTERVAL Opn/Sgz SHOT SOZ should be 9'deeper than TOWS. 14-11A \ \ 2-7/8" 6 10325-10328 0 03/21/10 ( I \ 2-7/8' 6 10328-10348 0 03/21/10 \\\ 41/2" SLID 10412-10650 0 09/14/05 4-1/2" SLID 11146-11802 0 09/14/05 I \ \ PBTD 11786' 14-11AL1 N. \ 2-7/8' SLID 10617-11172 0 08/25/10 'i \ \ 2-7/8" SLID 11417-11785 0 08/25/10 � 1' A. a 2-718"LNR i 6.16#,L-80 SIL, 11818' 'lest 4-12"LNR,12.8#,L-80 BTC/ET-M, — 11804' I 0058 bpi,13=2.441" i .0158 bpf,13=3.958" DATE FEV BY COMMENTS DATE FEV BY COAST NIS PRUDHOE BAY UNIT 08/04181 PKR191 ORIGINAL COMPLETION 09/19/10 MK/PJC FINAL DRLG CORRECTIONS W3_L 14-11A 09/16105 N2ES SIDETRACK(14-11A) 0423/11 MSS/PJC SET LW SNAP LATCH(4/18/11) PERMT No: 2051260,2100940 08/26/10 NORDIC 2\CIO SIDETRACK(14-11AL1) 11/06/13 TMJMD CORRECTED PAN D AR No: 50-029-20529-01,(61) 08/29/10 PJC DRLG DRAFT CORRECTIONS 09/04/14 WKP/JM) RILL LATCH(08/30/14) SEC 9,T1 ON,R14E,1760'FB_8 1776'FN_ 09/01/10 CSR/PJC PERE CORRECTIONS 0422/15 JLS/J10 GLV C/O(04/14/15) 109/01/10 A.../AGR GLV 00 08/31/10 BP Exploration(Alaska) T1 = FPC 1MILI- AD= GRAY 14.-1 1 __ SAFETY NOTES: WELL ANGLE>70°fa 10459'" ACTUATOR= BAKBBC CHROME TBG"""" OKB..ELEV= 72' BF.B.EV= — KOP= 5200' Max Angle 91'@ 11610' I1 2221' —{4-1/2"HES X NP,D=3.813" Datum ND-= 10406 Datum TVD= 8800'SS 3160' —{EST TOP OF TIEBACK CMT 113-3/8'CSG,72#,L-80,D=12.34r —{ 2651' GAS LFT MANDRELS 1t�1 t1 ST MJ ND DEV TYPE VLV LATCH FORT DATE 415 3166 3166 1 KGB-2' DM' BK 0 04/14/15 1., /4 4 4743 4743 0 KGB-2 DIN BK 0 04/14/15 1'4, 4• 3 6112 6021 33 KGB-2 MY BK 0 08/15/10 1. 1' 2 7320 7004 44 KGB-2 DMY BK 0 04/13/10 41 14 M1' 141 �' 1 8822 8004 57 KGB-2 OBK 0 04/13/10 41 • /4'1 •' 6930' H7"BKR PORTED TACK SEAL ASSY,D=6.16' 7'TI33A CK CSG,26#,L-80 H 8930' 1 6930' —I T X 9-5/8'BKR C-2 ZKP LIP,D=6.29" TC-IVBTC-M,D=6.276' U _----4 6946' —9-5/8"X 7' BKR HMC LNR HGR,0=6.276" 9-5/8'CSG,47#,SOO-95 BTC,D=8.681" — 7109' I— 9-5/8'MLLOUT WINDOW(14-11A) 7109'-7125' 10067' --14-1/2"HES X NP,D=3.813' 10088' H{T X 4-1/2"BKR S-3 PKR,D=3.875" 1 el E 4-1/2'TBG,12.6#,13CR 80 VAM TOP, — 10143' .0152 bpf,D=3.958" 10111' --14-1/2'HES X M3,D=3.813" T LNR,26#,L-80 BTC-M, H 10330' TOL at 10,095'MD. TOC to TOL. .0383 bpf,D=6.276" 10130' H7"X 5'BKR ZXPLIP wl'TEBKSLV,D=4.41" 1 10131' H 4-12'HES XN Imo,D=3.80"(MLLED 08/03/10) 10143' —14-12'1M EG,D=3.958' BEHIND 4-1/2"packer WS set with TOWS at 10,350'MD 10152' J-{7"X 4-12"BKR HMC LNR HGR,D=4.41" ICT LNR 4-12"MONOBORE WHIPSTOCK(08/19/10) —I 10370' , 10159' -{5'X 4 12"XO, D=3.96" -3-1/2"x3-1/4"XO at-10,1 PERFORATION SUMMARY o.,, REF LOG: SPERRY SUN MD DGR 08/29/05 .- _— ANGLEATTOPPERF: @ x 2-7/8" 2-7/8" 13Cr to \Note:Refer to Ffoduction DB for historical pert data Iiit, XO at 10,675' 12,950'MD TD \SIZE SPF [ INTERVAL Opn/Sqz SHOT SQZ \ 14.11A \ \ 2-7/8" 6 10325-10328 0 03/21/10 I \ 2-7/8" 6 10328-10348 0 03/21/10 \ \ 4-1/2" SLTD 10412-10650 0 09/14/05 ( \ 4-1/2" SLID 11146-11802 0 09/14/05 ( ` \ PBTD 11785' 14-11AL1 \ \ 2-7/8" SLID 10617-11172 0 08/25/10 14-11A \ \ 2-7/8" SLID 11417-11785 0 08/25/10 I J 4.11411-s,Als' 2-7/8"LNR,6.16#,L-80 STL, 11818' ia 4-12'LNR,12.6#,L-80 BTCIBT-M, —{ 11804' .�:�:i .0058 bpf,D=2.441" .0158 bpf,D=3.958' •AO&A: DATE REV BY j COMMENTS DATE REV BY COIVIMENTS FRUDHOE BAY UNIT 08/04181 PI02191 ORIGINAL COMPLETION 09/19/10 MK/PJC F1 IAL ORLG CORRECTIONS WCL 14-11A 09/16105 N2ES SIDETRACK(14-11A) 0423/11 MSS/PJC SET LTP SNAP LATCH(4/18/11) PEZMT No: 2051260,2100940 08/26110 NORDIC 2 CTD SIDETRACK(14-11AL1) 11/06/13 TMJM) CORRECTS)MN D AR No: 50-029-20529-01, r 08/29/10 PJC DRLG DRAFT CORRECTIONS 09/04/14 WKP/JMD RILL LATCH(08/30/14) SEC 9,T1ON,R14E,1760'Fa&1776'FM 09/01/10 CSR/PJC FERF CORRECTIONS 04/22/15 JLS/JM) GLV 00(04/14/15) 09/01/10 JLJIAGR GLV 00(08/31/10) BP Exploration(Alaska) ® 11- vg s ss 11 � X111 '' 8 :i -- I111 ii ill ii m-- . E .. s m ♦ � � $ _4 � �11 1 1 g — _k € 11101Hi m t as _ 8 9 2 m ✓ am 1 Q l.i m 1 1 Ai CI c-� 8 I y J o4 o ' I iin Hi LL "' w t 1 • I _�1 a 11 11 . U z I ® G 1 U ° IIII n 111 a I J 1 111 III ono Z P > > illei I 1 Jp I. III B it kr El Eo W€� 3 /y ; . 111 W 8 E E LLJ U Ce NI r _. � U F O fO c ` C ,„ U O r2 0 m R W a - II $� ✓ o s` I Ci A I ie re Im N - o Lii I ' Z I d I w I I n d 1el i .1 E 9 Le W I 1 1] lri a I� . 1 my � _� I ¢ v °w A i a '. " s nm I K 1. 111 e ry o I $ II r ^o I ill 1p >� v. (i': . 1 Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the Patricia or Steve _ upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" / boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Patricia or Steve work) the initial reviewer will cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, then check the "Suspended" box and initial that change. Guy or Victoria The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug for Jenni Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the History tab Jenni in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will change Jenni the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Jenni Geologists will check the "Well by Type Work Outstanding" user query in Patricia or Steve RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 02 Le - O c7 L. Well History File Identifier Organizing (done) ❑ Two-sided II IIIIII III Iliii ❑ Rescan Needed I 1111111 Hull RE AN DIGITAL DATA OVERSIZED (Scannable) for Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: her, No/Type: Cp No ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: a 3 `9. /s/ me Project Proofing I I BY: ACM Date: c 3 / /s/ PIP Scanning Preparation I x 30 = 30 + /7 = TOTAL PAGES ft-i-9 (Count does not include cover sheet) ,^^ BY: Date: . 3 Is! !yy►�Ir Production Scanning I 11111111011111 Stage 1 Page Count from Scanned File: 5e) (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: i. (ES NO BY: Date: a/3 `L /s/ e Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 11111111111111111 ReScanned II 1111111111 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked 111111111 I 1)PV)nn19 1A/tall uicrnn,Film 1^num,Pnnm,lnn i o c o o ■ d f9 hi j O!O N I N o to N z 0 ! 2 II N U N C W0 W 0 (n 1 O w E ._d c a Q. to TA o a) 2 o' >c 2 2 a O O a coo . UI JDeU 2 F- 2 2 I O Q To• r a) O_ O O_ O_ O_ O_ O O O co O O O O J U N V N N N N N N 17• 15 O 0 M co M M M M O c 'a O — c c c c c c a) o E _ = a) a) a) N a) a) �/ Q (n Y OU O O O O O O o LL Q "a U c co cL co co co 0 co rn co co ` O z m o 0 0 CO 0 0 0 0 0 d d z Z 0 CL P 0 N .�- N N N .- 1. N. 2 O E N.Z N N N c Lii g .2 N N. co co co 0 ID ID CO Z 6 6 C ^ CO M CO '- (0 M a N o 0 0 0 0 0 co o c,.• v W W J > U m o 0 Z o c a�i c a o Z - Q m re z y 0 o II J 0. m � m j = .� O • o f m i° 0 0 0 0 c >. E N o ZI U U U U a) o ii O G 0 .� co I a) I On a) o ! Lo ID 0 n J CO N U) N Uf) U ; •_ 0 CO J J U) Q I— 0. i-- N W G a CO Q m N CO CO c O a) u N C/ o o co a o re o- 21 a 0 w w w Q z o a O > > > a) a) a)Q a) 0 p j f.t c .N . L 7.•cn co 1° -° 0 m X N N CO CO Z v g m m C c c c c m a) a) .o 0 o f E o o • CD iI 7 CO > > > > E E as as O l Z v) o v v Co ca re a0 �, H c c c U U 5 O Z l II en 1••• E O I Tt ry O) 2 to Q o 0 c Q a coo Z t c lilOZ CV } }I C O o w a) O cv 0 a B. m LL u. Q o E E E E ? -o w N Z N m N p ao o O C rn J N z 0 n O d C O H 1 P 0 E J J J J d d CI FT J O H W CL W 3 Q 0 <Ce U 0 o °m II ' N N Z o ,_ Cl N 0 N ci Z it Q U O Z N 7 y I- J ° cc a O Z a o 0 w o IX a I w w � I U m 0 Z Q s 7 os J a ra G. 0 c C N o O N O g E o 00 , 0 J J a Q I''' F- o E o C > N CO CO CO IL //=/� O CD I V/ p m .I Q H a re a� 1 , Q ° E O z E U a Z a) CO I CI) I CO I . >j m m F- -a o y o 3 N N ' a) y I Q' y 0 c a C .2 r la E 0 0 0 a i O INTEQ Log & Data Transmittal Form >> To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage, Alaska 99501 A;tthtion: Christine Mahnken Reference: 14-11AL1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print—GR Directional Measured Depth Log (to follow) 1 color print—MPR/Directional TVD Log (to follow) 1 color print—MPR/Directional Measured Depth Log (to follow) { i'. LAC Job#: 3335833 Sent by: Debbie Hoke Date: 12/10/2010 Received by: ' Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 &!D -69(/ Baker Hughes INTEQ 7260 Homer Drive RAKER Anchorage,Alaska 99518 c O.5—/-(d HUGHES Direct:(907)267-6612 INTEQ FAX: (907)267-6623 BAKER HVaHES Baker Atlas PRINT DISTRIBUTION LIST COMPANY HP EXPLORATION(ALASKA)INC COUN I Y NORTH SLOPE BOROUGH WELL NAME 14-11ALI STATE ALASKA • FIELD PRUDHOE BAY UNIT DATE 12/10/2010 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO#:3335833 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: 0/0-x'99' Page 1 of 1 4 STATE OF ALASKA ` ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 8/25/2010 210-094 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 8/21/2010 50-029-20529-60-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/24/2010 PBU 14-11AL1 1776'FNL, 1759'FEL,SEC.09,T1ON, R14E, UM 8. KB(ft above MSL): 71.4' 15.Field/Pool(s): Top of Productive Horizon: 4999'FNL,2326'FEL, SEC.09,T1ON,R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 5063'FNL, 1439'FEL, SEC.09,T1ON, R14E, UM 11818' 8962' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 674727 y- 5938553 Zone- ASP4 11818' 8962' ADL 028312 TPI: x- 674242 y- 5935318 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 675131 y- 5935274 Zone- ASP4 None 18.Directional Survey: ® Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: GR, ROP,Press, Res 10369' 8850' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 110' Surface 110' 32" 300 sx Permafrost 13-3/8" 72# L-80 Surface 2651' Surface 2351' 17-1/2" 1640 sx Fondu.400 sx AS II 9-5/8" 47# L-80JS00-95 Surface 7109' Surface 6343' 12-1/4" 500 sx Class'G' 7" 26# L-80 24' 10330' 24' 8828' 8-1/2" 168 sx Class'G'.480 sx Class'G' 4-1/2" f 12.6# L-80 10130' 10369' 8714' 8350' 6-1/8" Uncemented Slotted Liner 2-7/8" ✓ 6.16# L-80 10116' 11818' 8706' 8962' 4-1/8" /do ft+44+•-'r 24. Open to production or injection? IN Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 2-7/8'Slotted Liner 4-1/2", 12.6#, 13Cr80 10143' 10088' MD TVD MD ND 1061T-11172' 8910 -8921 ✓ 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11417'-11785' 8950'-8962' uL,,-1 w,LFII j;" DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 'VM C 1 ,Freeze Protected with 50 Bbls Diesel ab...,hipyT.3 1 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): September 18,2010 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 9/19/2010 12 Test Period ♦ 64 90 2244 128 1414 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 240 1450 24-Hour Rate ♦ 128 181 4489 Not Available 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical res It AAC 250.071. C None OCT 1 3 Z010 t �DMS OCT 14 ZO > U &G8s Cans.COmr Uion Form 10-407 Revised 12/2009 C NTINUED ON REVERSE AticherepSubmit Original Only 74 /6I'ZCt•/0 /l� '0./d 6 29. GEOLOGIC MARKERS(List all formations and n ,rs encountered): 30. ORMATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Shublik A 10366' 8849' None Shublik B 10412' 8873' Shublik C 10443' 8887' TSAD/46P/Top Zone 4B 10512' 8904' Formation at Total Depth(Name): Top Sadlerochit/Top Zone 4B 11818' 8962' 31.List of Attachments: Summary of Daily Drilling Reports,Well Work Summary,Well Schematic Diagram,Surveys. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra S(ewman . -- Title: Drilling Technologist Date: O ( 2- 1 D PBU 14-11 AL1 210-094 Prepared By Name/Number Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Wilmer Hoffman,564-4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Altemating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only 14-11 AL1 , Well History Date Summary 08/02/10 MIRU CTU #9. Objective-mill XN nipple and drift for W/S. Riq uu in progress-Switch to weather standby WSR due to high winds. 08/02/10 CT-9 Resume job after weather standby. PJSM, discuss M/U of tools& Lubricator, hazards during M/U, job assignments. R/U, M/U Lubricator& Baker Milling string, RIH to mill. 08/03/10 PJSM, discuss M/U of tools& Lubricator, hazards during M/U,job assignments. R/U, M/U Lubricator& Baker Milling string, RIH to mill. Mill out XN nipple w/3.8" mill&string reamer, RIH to 10400' POOH. PJSM R/D of lubricator&tool string. "Inspection of Socket" bulletin discussed in safety meeting. Drift with dummy whipstock OD of 3.7 length of 19.2'to 10400'pooh, 08/09/10 T/I/O=2000/1750/0 Performed bleed off test on MV, SSV, and Swab with 2000 psi downhole pressure. (Passed) Set 4" CIW H TWC w/1-2'ext. @ 104"Torque tree flanges to spec. (See log for details)Test tree to 300 psi.-5 min. (passed)5000 psi.-5 min. (passed) Pulled 4" CIW H TWC. Installed tree cap and tested sawb to 300 psi.-5 min. (passed)and 3500 psi.-5 min. (passed) 08/13/10 T/I/O/OO=SSV/1790/10/90.Temp=SI. Bleed IA and OA to 0 psi (pre CTD). AL and flow line are disconnected. OA FL near surface.OOA FL near surface. IA FL Q 6197', 85' below oglv.(108.5 bbls). Bled OOAP to bleed trailer from 90 psi to 0 psi in 1 hour 20 min (all gas). Bled OAP from 10 psi to 0 psi in 10 min (all gas). Monitored for 30 min. OAP unchanged, OOAP increased 5 psi. No need to bleed IAP per WIE. Final WHPS=SSV/1790/0+/5 Job complete. SV,SSV,WV=C. MV=Unverifiable. IA,OA,OOA=OTG. NOVP. 08/13/10 SET 4 1/2" SLIP STOP CATCHER @ 6219'SLM. FW HP=1900/1800/0 08/14/10 PULL BK-OGLV FROM STA#3(6108' SLM/6112' MD), PULL BK-LGLV FROM STA#4(4734'SLM/4743' MD) &STA#5(3153' SLM/3166' MD). SET BK-DGLV IN STA#5(3153' SLM/3166' MD), STA#4(4734' SLM/4743' MD), STA#3(6108' SLM/6112' MD). MIT-IA TO 3000#(MIT-IA PASSED) PULLED EMPTY CATCHER FROM 6219' SLM ***WELL S/I ON DEPARTURE***NOTIFIED DSO 08/14/10 T/I/O/00= 1700/1800/0/0 Temp=SI Assist Slickline pump as directed- MIT-IA PASSED to 3000 psi (CTD Prep) Pumped 3 bbls 60/40 MW spear followed with 160 bbls 95*crude down IA. Pressured up IA to 3000 psi with 2.6 bbls crude. 1st 15 min IA lost 80 psi,2nd 15 min IA lost 20 psi with a total loss of 100 psi in 30 min test. Bled back 3 bbls crude. Final WHP's=2250/600/0/0 "Slickline has control of well at departure" 08/15/10 T/I/0=SSV/550/0+/15.Temp=SI. Bleed WHPs(pre CTD). Flowline,AL and well house removed. IA FL @ surface. SV,SSV=closed. IA,OA,00A=open to gauge. NOVP. 08/15/10 T/I/0/00=SSV/530/5/20.Temp=SI. Bleed IA, OA,OOA to 0 psi (Pre Rig).AL,flowline and well house have been removed. IA companion has integral installed, IA FL @ surface. OA, OOA FL's near surface. Bled IAP from 530 psi to 0 psi in 25 mins (bled back 1 bbl of crude). Bled OOA from 20 psi to 0 psi in 50 mins(gas). Bled OA from 5 psi to 0 psi in 1 minute(gas). Monitor for 30 mins, IA, OA, OOA unchanged. Job complete. Final WHPs=SSV/0/0/0. SV,WV, SSV=Closed. MV=Open. IA, OA, OOA=OTG. 08/15/10 Load and Kill (pre-CTD) 08/16/10 T/I/O/0=2100/20/0/0 Temp=Sl Load and Kill (pre-CTD) Pumped 5 bbls 60/40 methanol spear,235 bbls 1%kcl and 40 bbls diesel (freeze protect)down TBG. FWHP's=0/0/0/0 VALVES in following positions-and operator notified of positions and result of job: Wing closed, Swab closed, SSV closed, Master open, IA open, OA open-Well SI 08/16/10 T/I/0=vac/0/0; Set 4-1/16" CIW "H"TWC#257 thru 5-1/8" Gray Tree for Upper Tree Removal and Nordic 2 to move on; 1-3'ext. used,tagged © 108"; No problems 08/17/10 /I/0=0/0/0 Removed upper tree and reinstalled tree cap on top of master valve. Page 1 of 2 14-11 AL1 , Well History Date Summary 08/18/10 T/I/O=Vac/0/0; Pulled 4-1/16" CIW "H"TWC#257 thru stack for Nordic 1 post BOPE test; Low pressure test on lubricator passed @ 300 psi. and High pressure test passed @ 3500 psi.; RKB=23.8', 1-3'and 3- 5' exts. used,tagged @ 84"; No problems 08/25/10 T/I/O=Vac/0/0 Pressure tested Lubricator-LOW :300 PSI -03:08-03:13/Pass HIGH : 3500 PSI -03:17- 03:22/Pass . Set 4-1/16" CIW "H"TWC#283 thru stack, RKB=23.00+1.80, 3-5' 1-3'ext. used tag @ 87" Nordic 2 to move off well....no problems. 08/26/10 T/I/O=TWC/0/0 Upper tree install: Verified 2 barriers: pressure tested against gate to 500 psi (PASS)then Pressure tested TWC to 500 PSI/Low(PASS)&2000 psi/High (PASS). Removed tree cap bonnet. Installed new FMC 120 5x7 upper tree.Torqued to 1281 ft 08/27/10 T/I/O=TWC/0/0 Upper tree install Verified 2 barriers; Pressure tested against master 500 psi/Low 5 min (PASS)&5000 psi/High 15 min (PASS).Then pressure tested against swab 500 psi 5 min (PASS). Removed tree cap, rigged up lubricaror. Pressur tested lubricator 500 psi/Low 5 min (PASS) &3500 psi/High 15 min (PASS). Pulled TWC#283 with CIW lubricator @ 135". Closed MV&SSV, Reinstalled treecap 08/28/10 CURRENTLY RIGGING UP SLICKLINE UNIT#4518 TO SET TTP 08/29/10 SET 4 1/2" XX PLUG IN SVLN @ 2203'SLM(2221' MD) MIT-T W/TRIPLEX TO 3000psi (PASSED) ***WELL LEFT S/I - DSO NOTIFIED-TAG HUNG ON MASTER*** 08/30/10 SET 4 1/2"XX PLUG IN SVLN Ca 2203' SLM(2221' MD) MIT-T W/TRIPLEX TO 3000psi (PASSED) ***WELL LEFT S/I - DSO NOTIFIED-TAG HUNG ON MASTER*** 08/30/10 ***WELL S/I ON ARRIVAL*** (post ctd) CURRENTLY RIGGING UP SLICKLINE UNIT#4518 TO PULL TTP, RUN SBHPS, & SET GASLIFT VALVES 08/31/10 PULL 4 1/2"XX PLUG FROM 2204' SLM/2221' MD TAG DEP. SLV. Q 10088' SLM/10116' MD,W/3.5" CENT,S. BAILER(+28' CORRECTION, NO SAMPLE) SD © 10500' SLM W/2.15" CENT,S. BAILER(NO SAMPLE) RAN PETREDAT DUAL GAUGES, MADE ALL STOPS PER PROGRAM (see log) SET SLIP STOP CATCHER © 4879' SLM PULL DGLV's FROM STA#4 Q 4729' SLM/4743' MD&STA#5 © 3149'SLM/3166' MD SET BK-LGLV IN STA#5& BK-OGLV IN STA#4 PULL SLIP STOP FROM 4879' SLM ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED*** 09/16/10 ASRC Tets Unit#2,Transport equipment to location, begin Rig up, ***Job in Progress*** L ***Inlet 14-11, Outlet 14-18*** � 09/17/10 ASRC Test Unit#2, Complete Rig up, Begin flow back, ***Job in Progress*** /a") ***Inlet 14-11, Outlet 14-18*** 09/18/10 ASRC Test Unit#2, Continue flow back, Monitoring for solids, DRIL Performed Well Control and Emergency Drills. ***Job in Progress*** ***Inlet 14-11, Outlet 14-18*** 09/19/10 ASRC Test Unit#2, End 12 hour test,Begin Rig down, ***Job in Progress*** ***Inlet 14-11,Outlet 14-18*** 09/20/10 ASRC Test Unit#2, Complete Rig down, Leave location, ***Job Complete*** ***Inlet 14-11, Outlet 14-18*** Page 2 of 2 North America ALASKA- BP Page 1 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date: 8/24/2010 X3-00W28-C(1,521,780.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release: 8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/18/2010 08:00 - 10:00 2.00 RIGU P DECOMP CALL OUT VALVE CREW TO PULL TWC. PT LUBRICATOR TO 250/3500 PSI,GOOD. PULL TWC AND CLOSE MASTER VALVE, WELL IS ON VAC. INSPECT TWC,LIKELY DIDN'T HOLD PRESSURE DUE TO GRIT GETTING INTO THE POPPET SEATING AREA. 10:00 - 10:15 0.25 RIGU P DECOMP PJSM TO PULL CT ACROSS PIPE SHED AND INTO INJECTOR. DROPPED OBJECTS AND GOOD COMMUNICATIONS WERE DISCUSSED. 10:15 - 12:00 1.75 RIGU P DECOMP PICK UP CT STUFFING BOX AND M/U TO WELL. M/U INJECTOR TO STUFFING BOX. RUN CABLE THROUGH STUFFING BOX AND M/U CABLE TO WINCH DRUM,ATTACH SHEAVE TO NIGHT CAP ON WELL. 12:00 - 13:30 1.50 RIGU P DECOMP PULL CABLE TIGHT AND REMOVE CLAMP FROM SHIPPING BAR,THEN REMOVE SHIPPING BAR. PULL CT ACROSS PIPE SHED ROOF AND INTO INJECTOR. 13:30 - 15:30 2.00 RIGU P DECOMP REMOVE INTERNAL GRAPPLE FROM CT. INSTALL BOOT ON END OF CABLE. M/U CT RISER AND PUMP CABLE SLACK BACKWARDS,CABLE IS HEARD MOVING. 15:30 - 16:00 I 0.50 RIGU P DECOMP P/T INNER REEL VALVE AND CT STRIPPER TO 250/3500 PSI. SLIGHT LEAK ON BULKHEAD,TIGHTEN AND RE-TEST,GOOD. 16:00 - 17:00 1.00 RIGU P DECOMP PUMPED SLACK WITH KCL WATER AT MAX RATE. 17:00 - 17:15 0.25 RIGU P DECOMP SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CUTTING COIL. 17:15 - 17:45 0.50 RIGU P DECOMP CUT 76'OF COIL WITH HYD CUTTER. 17:45 - 20:15 2.50 RIGU P DECOMP M/U SWS CTC. PULL TEST. M/U BHI UQC. 7 TEST E-LINE AND PRESS TEST. et(INSTALL CTC. PUTLL TEST TO 36K LB,GOOD. 4G) 20:15 - 21:00 0.75 RIGU P DECOMP TEST WIRE AND MU UQC. 2000 MEG,55 OHM. 21:00 - 23:00 2.00 WHIP P WEXIT ATTEMPT TO FILL WELL W/KCL W/ SAFELUBE WHILE UNSTABBED,PUMPING AT 2 BPM. UNABLE TO CATCH FALLING FLUID LEVEL AFTER—180 BBL AWAY. PT CTC AND BAKER TOOLS TO 4300 PSI AND MU BHA. 23:00 - 00:00 1.00 WHIP P WEXIT STAB ON AND FILL WELL AT 4 BPM W/KCL W/SAFELUBE. CONTINUED ON REPORT 08/19/2010 8/19/2010 00:00 - 01:00 1.00 WHIP P WEXIT CONTINUED FROM REPORT 08/18/2010 FILLING WELLAT4 BPM W/NO POSITIVE WHP. PUMPED 200 BBL TOTAL AT 4 BPM. 01:00 - 03:30 2.50 WHIP P WEXIT RIH W/WHIPSTOCK CIRCULATING AT—0.3 BPM THROUGH OPEN EDC W/NO RETURNS. 03:30 - 05:00 1.50 WHIP P WEXIT LOG GR TIE-IN,CORRECTION OF(+11'). LOG CCL, ENSURE SET DEPTH IS COLLAR-FREE AS PER PROGRAM. Printed 10/12/2010 7:10:36PM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date:8/24/2010 X3-00W28-C(1,521,780.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release: 8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 05:15 0.25 WHIP P RIH PAST SET DEPTH. PULL UP TO SET DEPTH W/CT IN TENSION. UP WEIGHT IS 40500 LB. PARK AT SET DEPTH TOP OZ WHIPSTOCK AT 10368'MD. TRAY IS HS (ZERO DEG ORIENTATION). CLOSE EDC. BEGIN PUMPING DOWN CT W/KCL TO FILL COIL AND INITIATE SETTING SEQUENCE. AFTER 5 BBLS AWAY AT 1 BPM,CATCH FLUID IN COIL. BEGIN TO INCREASE PRESSURE ON CT AS PER BAKER INSTRUCTIONS. SEE WOB INCREASE BY 3K LBS NEAR END OF SETTING STROKE. SHEAR AT 2800 PSI, INCREMENTAL WOB FALL OFF. STACK 5K LB WOB DOWN ON WS,NO SLIPPAGE. BEGIN POOH. 05:15 - 07:15 2.00 WHIP P ■- WEXIT PR PUMPING BPM PSI CIRC PRESSURE NO RETURNS WITH NO RETURNN AND AND NO WHP. 07:15 07:30 0.25 WHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND DMITIGATION FOR CHANGING BHA. 07:30 - 09:00 1.50 WHIP P WEXIT LAY OUT WHIPSTOCK RUNNING TOOLS. M/U 3.80"HCC DIA WINDOW MILL,3.80", STRING REAMER, MOTOR. JTS PH6 AND COILTRAK. BHA OAL= 120.37'. 09:00 - 09:30 0.50 STWHIP N SFAL WEXIT RIH BHA#2. BHA IS STACKING WT AND TRIPS INJECTOR AFTER RIH ABOUT 3 FT. NOTHING SEEN ON DWOB. TROUBLESHOOT AND FIND NO OBVIOUS PROBLEMS AT SURFACE. 09:30 - 10:00 0.50 N SFAL WEXIT BREAK OFF CT RISER,LAY DOWN COILTRAK TOOLS AND HANG 2 JTS OF PH6+MOTOR WHILE TROUBLESHOOTING INJECTOR. CONTINUE PUMPING 0.6 BPM INTO WELL WHILE TROUBLESHOOTING. WHILE L/D TOOLS FIND A PINHOLE LEAK BETWEEN 2 XO IN THE STRING,WILL REPLACE THESE. 10:00 - 10:50 0.83 N SFAL WEXIT WITH INJECTOR HANGING,TRY TO RIH. STILL STACKING WT AFTER 3 FT. LOWER INJECTOR AND OPEN DOORS TO INSPECT CT PACKOFF. NOTHING UNUSUAL FOUND ON CT PACKOFFS. CALL SLB MECHANICS OUT TO HELP TROUBLESHOOTING. 10:50 - 13:00 2.17 STWHIP N SFAL WEXIT SLB MECHANICS ARRIVE,CONTINUE TROUBLESHOOT. CHECK SPACER PLATE ON CT WEIGHT CELL, OK. SUSPECT BAD WEIGHT CELL,CHANGE IT OUT. 13:00 - 15:30 2.50 STWHIP N SFAL WEXIT NEW WEIGHT CELL IS GIVING THE SAME RESULTS,NOT ABLE TO RIH PAST 4 FT. ATTACH LOAD CHECKER(AUXILIARY WT CELL)TO END OF CT TO CHECK NEW WT CELL. NEW WT CELL APPEARS TO BE _ WORKING. 15:30 - 15:45 0.25 STWHIP N SFAL WEXIT PJSM FOR REMOVING STUFFING BOX. OVERHEAD LOADS AND COMMUNICATIONS WERE DISCUSSED. Printed 10/12/2010 7:10:36PM • North America -ALASKA- BP Page 3 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date:8/24/2010 X3-00W28-C(1,521,780.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor:NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:45 - 16:30 0.75 STWHIP N SFAL WEXIT INSPECT INJECTOR CHAINS,FIND ONE SLIGHTLY DEFORMED CLIP AND CHANGE IT OUT. TIGHEN UP GOOSENECK,WAS LOOSENED DURING THE TROUBLESHOOTING. 16:30 - 19:00 2.50 STWHIP N SFAL WEXIT UNBOLT CT STUFFING BOX AND LIFT UP INJECTOR, RUN STUFFING BOX UP AND DOWN AND CHECK WEIGHTS. SOME METAL DEBRIS FOUND ON TOP OF STRIPPER BRASS. CHAIN INSPECTION. CONTINUE FILLING HOLE DURING THIS WORK AT-0.5 BPM. 19:00 - 20:00 1.00 STWHIP N SFAL WEXIT CO UPPER BRASS,INSPECT LOWER BRASS- NO DEFICIENCIES OBSERVED. CONTINUE FILLING HOLE AT 0.5 BPM. 20:00 - 21:00 1.00 STWHIP N SFAL WEXIT MU NEW CTC,PULL TEST TO 36K. CONTINUE FILLING HOLE AT 0.5 BPM. 21:00 - 21:30 0.50 STWHIP N SFAL WEXIT PJSM TO RIH W/NOZZLE TO TEST INJECTOR. CONTINUE FILLING HOLE AT 0.5 BPM. 21:30 - 22:00 0.50 STWHIP N SFAL WEXIT RIH TO 2000',NO PROBLEMS W/INJECTOR. PULL TO SURFACE,NO PROBLEMS W/ INJECTOR. CONTINUE FILLING HOLE AT 0.5 BPM. 22:00 - 00:00 2.00 STWHIP N SFAL WEXIT HEAD UP BHI. PJSM FOR MU MILLING BHA. CONTINUE FILLING HOLE AT 0.5 BPM. AT THIS TIME, PIT LEVEL STARTS TO DROP CONSIDERABLY MORE RAPIDLY THAN 0.5 BPM. LOSE ADDITIONAL-70 BBLS IN-10 MINUTES. WAIT-45 MINUTES FOR MORE WATER TO ARRIVE. CONTINUED ON REPORT 08/20/10. 8/20/2010 00:00 - 01:30 1.50 STWHIP N SFAL WEXIT CONTINUED FROM REPORT 08/19/10. MORE WATER ARRIVES. PUMP 30 BBLS KCL W/SAFELUBE DOWN BACKSIDE AT 2 BPM. PIT VOLUME FALLS BY 130 BBLS DURING THIS TIME,APPARENTLY TO WELL. ISOLATE BACKSIDE. MU MILLING BHA AND STAB ON. OPEN WHITEY ON LUBRICATOR,NO VACUUM NOTED. ISOLATE CT. RIH W/MILLING ASSEMBLY W/O PUMPING. 01:30 - 04:00 2.50 STWHIP P WEXIT RIH W/MILLING ASSEMBLY W/O PUMPING. LOG TIE-IN, CORRECTION OF(+22'). DRY TAG WHIPSTOCK AT 10370'MD. PJSM W/ CREW REGARDING UPCOMING PUMPING OPERATIONS. 04:00 - 07:00 3.00 STWHIP P WEXIT RECIPROCATE CT TEN TO TWENTY FOOT ABOVE WS. ONLINE DOWN CT W/GEOVIS AT 2.5 BPM(NO RETURNS). SEEM TO CATCH FLUID IN CT AFTER-6 BBLS AWAY,PUMPING AT 1480 PSI AT 2.5 BPM W/NO WHP,NO RETURNS. FILL CT W/GEOVIS,STILL NO RETURNS AT SURFACE. ONLINE DOWN BACKSIDE W/40 BBLS GEOVIS FOLLOWED BY 85 BBLS KCL PUMPING AT 2 BPM. WELL SUCKING-0.5 BPM FASTER THAN WE ARE PUMPING. DOWN ON PUMP. ONLINE DOWN CT WITH GEOVIS.STILL HAD FULL FLUID LOSS WITH GEOVIS ON PERFS. CIRC 2.5 BPM,2180 PSI, NO RETURNS. Printed 10/12/2010 7:10:36PM North America -ALASKA- BP Page 4 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date:8/24/2010 X3-00W28-C(1,521,780.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release: 8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 10:00 3.00 STWHIP P WEXIT TAG WHIPSTOCK AT 10369'. MILLING 3.80"WINDOW THRU 4-1/2", L-80 PGA UNCEMENTED LINER. ( / 2.5 BPM,2210 PSI, NO RETURNS. 1 FPH, 700#WOB. RETURNS INCREASED TO 1.4 BPM AFTER 2 FT OF MILLING. MILLED TO 10371'. 10:00 - 13:00 3.00 STWHIP P WEXIT MILL 3.80"WINDOW THRU 4-1/2", L-80 UNCEMENTED LINER 2.5 BPM,1950 PSI,4K WOB,1 FPH,1.4 BPM RETURNS. MILLING WITH 2#BIOZAN TO SAVE COST. TOTAL FLUID LOST MILLING WINDOW BY Wev 1300 HRS=750 BBLS. MILLED TO 10372'. Ilfr; 13:00 - 16:30 3.50 STWHIP P WEXIT MILL 3.8"WINDOW. 2.5 BPM,1.4 BPM RETURNS,3-4K WOB,1/2 FPH. RETURNS INCREASED TO 1.8 BPM WHILE MILLING. _ MILLED TO 10375' 7 16:30 - 00:00 7.50 STWHIP P WEXIT MILL 3.8"WINDOW,2.5 BPM,1.8 BPM RETURNS,2230 PSI,1 FPH TIME MILLING LAST 2 FT OF WINDOW. 3-4K WOB. 19:15: MILLING WINDOW AT 10376.2'MD AT 2325 PSI AT 2.5 BPM W/2.0 BPM RETURNS W/ 2 PPB BIOZAN. WOB:3K. SURFACE WEIGHT 23200 LB. BHP/PVT/ECD: 4237 PSI/ ADDING FLUID/9.34 PPG. 22:00:TIME DRILLED REAMER OUT OF WINDOW. MILLING FORMATION AT 10379.5' MD AT 20 FPH W/3K LB WOB AT 2450 PSI AT 2.5 BPM W/2.1 BPM RETURNS W/2 PPB BIOZAN. BHP/ECD/PVT:4272 PSI/9.42 PPG/402 BBL. SURFACE WEIGHT 21200 LB. 23:30: DRILLING HAS SLOWED AGAIN- DRILLING FORMATION AT 10384.1'MD. DRILLING AT 2465 PSI AT 2.5 BPM W/2.1 BPM RETURNS W/2 PPB BIOZAN W/4K LB WOB. BHP/ECD/PVT:4274 PSI/9.4 PPG/361 BBLS. HAVE RETURNED TWO GOOD SAMPLES OF FORMATION SINCE WE EXITED THE WINDOW. MIDNIGHT:DRILLING AT 10385.7'MD AT 2480 PSI AT 2.5 BPM W/2.1 BPM RETURNS W/2 PPB BIO W/3.4K LB WOB AND 22600 LB SURFACE WEIGHT. BHP/ECD/PVT:4278 PSI/9.43 PPG/341 BBLS. CONTINUED ON REPORT 08/21/10. IAP=OAP _ =00AP=0 PSI. 8/21/2010 00:00 - 02:30 2.50 STWHIP P WEXIT CONTINUED FROM REPORT 08/20/10. IAP/OAP/OOAP=0 PSI. DRILL FORMATION TO 10388'MD. MAKE THREE REAMING RECIPROCATIONS ACROSS WINDOW AT-1.5 FPM. DRY DRIFT WINDOW-CLEAN. 02:30 - 04:00 1.50 STWHIP P WEXIT POOH CIRCULATING AT 1.5 BPM. AT 03:30: POOH AT 4600'MD AT 100 FPM AT 1.5 BPM W/1 BPM RETURNS W/2 PPB BIOZAN. Printed 10/12/2010 7:10:36PM North America-ALASKA- BP Page 5 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date:8/24/2010 X3-00W28-C(1,521,780.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:45 0.75 STWHIP P WEXIT AT SURFACE. FLOW CHECK-GOOD. UNSTAB,LD MILLING ASSEMBLY. GAUGE REAMER AND MILL: BOTH ARE 3.80" GO,3.79"NOGO. CHECK WELL-FLUID LEVEL NOT FALLING, WELL IS HOLDING A STATIC COLUMN OF 2 PPB BIO. WHILE POOH, REPLACED STUFFING BOX ON POD#2 OF PUMP#1. STUFFING BOX WAS INCORRECTLY INSTALLED AND SHATTERED THE STUFFING BOX HOUSING OF POD#2 OF PUMP#1. BEGIN STANDBY TO TROUBLESHOOT BROKEN STUFFING BOX HOUSING AT 04:45. 04:45 - 06:00 1.25 DRILL N RREP PROD1 STANDBY FOR REPAIR OF SHATTERED STUFFING BOX HOUSING ON POD#2 OF PUMP#1. 06:00 - 09:15 3.25 DRILL N RREP PROD1 TOUR CHANGE. CONTINUE STAND BY FOR PUMP REPAIRS. CALL SLB FOR AVAILIBILITY OF STAND ALONE BACKUP PUMP UNIT. 09:15 - 09:30 0.25 DRILL P PROD1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U DRILLING BHA. 09:30 - 10:30 1.00 DRILL P PROD1 M/U COILTRAK BUILD BHA#3 WITH 3.75"HYC DS49 RE-RUN BIT,2.1 DEG XTREME MOTOR AND 3"COILTRAK WITH RES. 10:30 - 12:20 1.83 DRILL P PROD1 RIH, PUMP 0.5/700 PSI THROUGH OPEN EDC. RIG UP SLB PUMP UNIT TO THE RIG CEMENT LINE AND PT,GOOD. START USED GEO-VIS SYSTEM DOWN CT. 12:20 - 13:40 1.33 DRILL P PROD1 LOG GR FROM 10200 FT TO TIE-IN DEPTH. CORRECT+92 FT. RELOG A SHORT SECTION TO CONFIRM. Printed 10/12/2010 7:10:36PM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/15/2010 End Date:8/24/2010 'X3-00W28-C(1,521,780.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:40 - 00:00 10.33 DRILL P PROD1 RIH TO 10350 FT AND CLOSE EDC. PASS THROUGH WINDOW AND TAG BOTTOM AT 10388 FT. BRING PUMP TO 2.4/1.4 BPM/2750 PSI AND START DRILLING. HOLD 15L TF INITIALLY TO BUILD AS PER PLAN AND GAIN SEPARATION FROM CASING. ROP IS 10-20 FT/HR INITIALLY. RETURNS ARE VARIABLE,20-100%. 20:45: DRILLING AHEAD AT 10469'MD AT 3080 PSI AT 2.5 BPM W/2.3 BPM RETURNS WI USED GEOVIS W/3.2K LB WOB AND 20500 LB SURFACE WEIGHT. BHP/ECD/PVT: 4649 PSI/10.16 PPG/147 BBL. ROP-15 FPH. 22:15: DRILLING AHEAD AT 10505'MD AT 3115 PSI AT 2.5 BPM W/2.35 BPM RETURNS W/USED GEOVIS AT 2.1K LB WOB AND 21150 LB SURFACE WEIGHT. BHP/ECD/PVT: 4669 PSI/10.2 PPG/122 BBL. 23:20: DRILLING AHEAD AT 10542'MD AT 2974 PSI AT 2.4 BPM W/2.2 BPM RETURNS W/ USED GEOVIS AT 1.3K LB WOB AND 21600 LB SURFACE WEIGHT. BHP/ECD/PVT:4675 PSI/10.2 PPG/108 BBL. HAD A STALL AND SUBSEQUENT DRILLING BREAK AT-10520' MD. DRILL TO 10551'MD. 23:40:WIPER TO WINDOW(CLEAN). PULL THROUGH WINDOW FOR TIE-IN. IAP:35 PSI OAP: 10 PSI. OOAP: 10 PSI. CONTINUED ON REPORT 08/22/10. 8/22/2010 00:00 - 01:15 1.25 DRILL P PROD1 CONTINUED FROM REPORT 08/21/2010 IAP:35 PSI OAP: 10 PSI OOAP: 10 PSI LOG EXTENDED TIE-IN FROM 10215'MD TO 10420'MD. CORRECTION OF ZERO FEET. PUMP ONE REPAIR COMPLETE. PULL INTO CASED HOLE AND TEST PUMP#1, LOOKS GOOD. RBIH TO RESUME DRILLING PUMPING W/PUMP#1. 01:15 - 03:30 2.25 DRILL P PROD1 RESUME DRILLING AHEAD AT 10551'MD. FREESPIN 2.4 BPM AT 2800 PSI. DRILL AHEAD AT 2.4 BPM W/2.1 BPM RETURNS W/USED GEOVIS N 2K LB WOB AND 21200 LB SURFACE WEIGHT. ROP-40 FPH. BHP/ECD/PVT:4679 PSI/10.2 PPG/ 87 BBLS. 02:20: DRILLING AHEAD AT 10608'MD AT 3150 PSI AT 2.4 BPM W/2.15 BPM RETURNS W/ USED GEOVIS AT 3K LB WOB AND 19200 LB SURFACE WEIGHT. ROP-80 FPH. BHP/ECD /PVT: 4696 PSI/10.23 PPG/70 BBL. ADD 90 BBLS NEW MUD TO ACTIVE SYSTEM. DRILL AHEAD TO 10700'MD. 03:30 - 04:00 0.50 DRILL P PROD1 WIPER TO WINDOW FROM 10700'MD,CLEAN BOTH DIRECTIONS. Printed 10/12/2010 7:10:36PM • North America-ALASKA- BP Page 7 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/15/2010 End Date: 8/24/2010 X3-00W28-C(1,521,780.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI: 500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:45 1.75 DRILL P PROD1 FREESPIN 2.5 BPM AT 2950 PSI. DRILL AHEAD FROM 10700'MD AT 2.5 BPM AT 3310 PSI W/3.4K LB WOB AND 19000 LB SURFACE WEIGHT W/FULL RETURNS. BHP/ECD/ PVT: 4738 PSI/10.3 PPG/126 BBL. ROP -100 FPH. 05:00: DRILLING AHEAD AT 10767'MD AT 2.5 BPM AT 3180 PSI W/FULL RETURNS W/2.4K LB WOB AND 18300 LB SURFACE WEIGHT. BHP/ECD/PVT:4686 PSI/10.2 PPG/124 BBL. DRILL AHEAD TO 10850'MD. CALL TD FOR BUILD SECTION HERE, BUILD AND TURN TARGETS HAVE BEEN MET. 05:45 - 07:30 1.75 DRILL P PROD1 POOH. PULL THROUGH WINDOW AND OPEN EDC. PUMP 2.70 BPM WHILE POOH. 07:30 - 07:50 0.33 DRILL P PROD1 AT 4700 FT CT DRILLER NOTICES LOSS OF CT WEIGHT WHILE POOH. STOP CT AND PUMP BU(37 BBLS)FROM HERE. NO GAIN IN PIT VOLUME WHILE DOING THIS. (NOTE: HOLE ANGLE GOES FROM 0 TO 30 DEG STARTING AT 4800 FT.) TRIP SHEET SHOWS NO GAIN OR LOSS. 07:50 - 08:20 0.50 DRILL P PROD1 SHUT DOWN PUMP AND FLOW CHECK WELL. RETURN FLOW IS 0.3 BPM DROPPING TO 0.15 BPM AFTER 10 MIN,GOES<0.1 BPM AFTER 20 MIN. OUT MM RATE IS SHOWING 0. OUT DENSITY STILL HIGHER THAN IN,GAS SENSORS SHOW ZERO. WELL IS BREATHING. 08:20 - 09:05 0.75 DRILL P PROD1 RESUME POOH. 09:05 - 09:20 0.25 DRILL P PROD1 PJSM FOR CHANGE OUT BHA. WELL CONTROL AND 50#LIMIT WERE DISCUSSED. 09:20 - 10:10 0.83 DRILL P PROD1 TAG STRIPPER AND SHUT DOWN PUMP, FLOW CHECK WELL. OUT FLOW GOES TO 0 ON MM AFTER 15 MIN, STILL SLIGHT AMOUNT AT THE SHAKER,NOT ENOUGH TO REGISTER ON MM. 10:10 - 11:20 1.17 DRILL P PROD1 POP OFF WELL AND L/D BHA#3. BIT IS 2-2, CHIPPED CUTTERS. TURN MOTOR FROM BHA#3 TO 1.2 DEG BEND AND M/U RE-RUN RAZOR EDGE DS49. 11:20 - 14:10 2.83 DRILL P PROD1 M/U CT RISER AND RIH. PUMP 0.3/1000 PSI WITH CLOSED EDC. TIE-IN DEPTH,CORRECT+4.5 FT. 14:10 - 14:35 0.42 DRILL P PROD1 PASS THROUGH WINDOW AT OL TF, BRING PUMP UP AND RIH TO FIND BOTTOM. 14:35 - 17:00 2.42 DRILL P PROD1 TAG BOTTOM AND DRILL FROM 10852 FT. HOLD 89-90 DEG INC FOR NOW TO GENTLY LOSE 3 FT OF TVD. 2.43/2.16 BPM @ 2800-3100 PSI. ROP IS AROUND 80 FT/HR WITH 1.2K DWOB. DRILL TO 11,000 FT. 17:00 - 18:00 1.00 DRILL P PROD1 WIPER TRIP FROM 11,000 FT TO WINDOW. 18:00 - 18:30 0.50 DRILL P PROD1 DRILL AHEAD FROM 11000'MD TO 11043'MD. PIT LEVEL RISES BY-4 BBLS,CONFIRM W/ MANUAL STRAP. BEGIN WIPER TO WINDOW. Printed 10/12/2010 7:10:36PM • North America -ALASKA- BP Page 8 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/15/2010 End Date: 8/24/2010 X3-00W28-C(1,521,780.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 20:20 1.83 DRILL P PROD1 WIPER TO WINDOW,CLEAN. PARK IN CASED HOLE. HAVE GAINED 11 BBLS SO FAR,CONFIRMED W/MANUAL STRAP. CONTINUE TO CIRCULATE IN CASED HOLE AT 2655 PSI AT 2.56 BPM. START TO LOSE RETURNS. AFTER—30 MINUTES IN CASED HOLE,HAVE LOST ALL 11 BBLS BACK TO WELL AND CONTINUING TO LOSE RETURNS AT 2.56 BPM IN/2.44 BPM OUT(CREEPING CT UP HOLE AT 1.5 FPM). PVT 406 W/CT AT 10250'MD. PUMPING 2.55 BPM RETURNING—2.4 BPM. RBIH TO RESUME DRILLING. PVT 407 W/CT AT 10700'MD. PUMPING 2.45 BPM RETURNING 2.42 BPM WHILE RIH AT 30 FPM. 20:20 - 23:00 2.67 DRILL P PROD1 DRILL AHEAD FROM 11043'MD.PVT 406 BBL. FREESPIN 2640 PSI AT 2.46 BPM. IAP: 110 PSI OAP: 10 PSI OOAP: 10 PSI. DRILLING AHEAD AT 2930 PSI AT 2.45 BPM W/ 2.35 BPM RETURNS W/2.2K LB WOB AND 20600 LB SURFACE WEIGHT AND—120 FPH ROP. BHP/ECD/PVT:4576 PSI/9.96 PPG/ 406 BBL. 20:40: DRILLING AHEAD AT 2930 PSI AT 2.45 BPM AT 11080'MD W/2.33 BPM RETURNS W/ 2K LB WOB AND 20800 LB SURFACE WEIGHT AND—90 FPH ROP. BHP/ECD/PVT: 4592 PSI/10 PPG/403 BBL. 22:00: DRILLING AHEAD AT 2900 PSI AT 2.4 BPM W/2.3 BPM RETURNS W/1.75K LB WOB AND 19800 LB SURFACE WEIGHT AND—100 FPH ROP. BHP/ECD/PVT: 4590 PSI/10 PPG/393 BBL. DRILL AHEAD TO 11200'MD. 23:00 - 00:00 1.00 DRILL P PROD1 WIPER TO WINDOW FROM 11200'MD. 2.42 BPM AT 2600 PSI W/—0.15 BPM LOSSES. IAP:380 PSI OAP: 10 PSI OOAP: 10 PSI CONTINUED ON REPORT 08/23/10. Printed 10/12/2010 7:10:36PM North America ALASKA :BP Page 9 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/15/2010 End Date: 8/24/2010 X3-00W28-C(1,521,780.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI: 500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/23/2010 00:00 - 05:50 5.83 DRILL P PROD1 CONTINUED FROM REPORT 08/22/10 IAP:380 PSI OAP: 10 PSI OOAP: 10 PSI. DRILL AHEAD FROM 11200'MD. DRILLING AHEAD AT 2900 PSI AT 2.4 BPM W/2 BPM RETURNS W/1.3K LB WOB AND 20400 LB SURFACE WEIGHT W/120 FPH. BHP/ECD/ PVT:4584 PSI/10.0 PPG/368 BBL. DRILL AHEAD. AT 11265'MD LOSE ALL RETURNS. ATTEMPT TO DRILL PAST LOSSES AT 2.5 BPM AT 1860 PSI W/NO RETURNS. DRILL AHEAD TO 11354'MD W/ FULL LOSSES. CONFIRM W/GEO THAT WE DRILLED THROUGH A FAULT. 02:15: WIPER TO WINDOW. STILL FULL LOSSES. TIE-IN,CORRECTION OF(+6'). DRILL AHEAD FROM 11354'MD 04:20:DRILLING AHEAD AT 11410'MD. GEO BELIEVES WE JUST CROSSED ANOTHER FAULT(11360). DRILLING AT 2.4 BPM AT 1600 PSI AT—110 FPH. 04:30: PU OFF BOTTOM AND RECIPROCATE WHILE GEO CALLS TOWN. STILL FULL LOSSES. UP WEIGHT CLEAN AT 48500 LB. 04:50: DRILL AHEAD AS PER GEO FROM 11420'MD. 05:50: WIPER FROM 11500'MD. 05:50 - 07:00 1.17 DRILL P PROD1 WIPER TRIP FROM 11500 FT. FULL LOSSES. CLEAN PASS UP AND DOWN. 07:00 - 09:00 2.00 DRILL P PROD1 DRILL FROM 11500 FT. CONTINUE DROPPING TVD SLIGHTLY DOWN TO 8886 FT. 2.4/0 BPM @ 1450-1900 PSI. ROP IS AROUND 120 FT/HR. DRILL TO 11650 FT. SHUT IN RETURN LINE AT CHOKE AND MONITOR WHP,STILL 0. 1 09:00 - 10:30 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW. UP WT IS 50K, CLEAN PICKUP. 10:30 - 12:00 1.50 DRILL P PROD1 DRILL FROM 11650 FT. CONTINUE HOLDING 88-89 DEG TO DROP 3 FT TVD. 2.40/0 BPM @ 1450-1800 PSI. ECD=7.7 PPG. ROP IS AROUND 150 FT/HR WITH 1-2K DWOB. DRILL TO 11800 FT. 12:00 - 13:30 1.50 DRILL P PROD1 WIPER TRIP FROM 11800 FT TO WINDOW. CLEAN PASS UP,WHILE RIH STACK WT AT 11280 FT AND POP THROUGH. 13:30 - 14:00 0.50 DRILL P PROD1 DRILL TO 11818 FT AND CALL TD HERE. SEPARATION OF RES CURVES INDICATED BED BOUNDARY NEARBY,LIKELY TOP SAD. 14:00 - 17:00 3.00 DRILL P PROD1 PICK UP AND REAM BOTTOM PORTION OF HOLE UNTIL CLEAN. SHALES FROM 11500-11550 ARE PROBLEMATIC. 17:00 - 17:20 0.33 DRILL P PROD1 LOG CCL FROM 10000 TO 10300 FT. 17:20 - 19:20 2.00 DRILL P PROD1 PERFORM ADDITIONAL REAMING PASS- STILL ERRATIC OVERPULLS IN THE VICINITY OF 11500'MD. ALMOST OUT OF MUD,MI RUNNING BEHIND. PULL INTO CASED HOLE AND LOWER PUMP RATE. Printed 10/12/2010 7:10:36PM North America -ALASKA- BP Page 10 of 10 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/15/2010 End Date: 8/24/2010 X3-00W28-C(1,521,780.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release: 8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:20 - 00:00 4.67 DRILL N WAIT PROD1 WAIT ON MUD FROM MI. PARKED IN CASED HOLE PUMPING AT—0.45 BPM SLOWLY RECIPROCATING CT. CONTINUED ON REPORT 08/24/10. 8/24/2010 00:00 - 02:45 2.75 DRILL N WAIT PROD1 CONTINUED FROM REPORT 08/23/10. PARKED IN CASED HOLE RECIPROCATING CT PUMPING AT 0.5 BPM WAITING ON MORE MUD TO ARRIVE FROM MI. 02:45 - 05:30 2.75 DRILL P PROD1 MUD ON LOCATION. RBIH TO REAM OH. IAP:0 PSI OAP:5 PSI OOAP: 10 PSI. TAG AT 11407'MD WHILE PUMPING 1.4 BPM (NO RETURNS). PU AT 50K LB CLEAN. INCREASE PUMP RATE TO 2.45 BPM AND RIH WITHOUT WEIGHT BOBBLE. CONTINUE IN HOLE AT 2.5 BPM. RUNNING WEIGHT 28400 LB. TAG AT 11486'MD AND SEE MOTOR WORK. PU,BREAK OVER AT 63K LB. LOWER PUMP RATE TO 1.4 BPM AND RIH W/O PROBLEM. SEE—4K LB WEIGHT BOBBLE AT 11500'MD. CONTINUE RIH AT 1.4 BPM. TAG UP AT 11633'MD. PU AND WORK THROUGH AT 1.5 BPM. TAG AT 11817'MD. PUH. GO TO 2.5 BPM AT 1710 PSI TO BACKREAM THROUGH PREVIOUSLY IDENTIFIED TROUBLE SPOTS. ALL CLEAN EXCEPT FOR ONE SMALL BOBBLE AND ASSOCIATED MOTOR WORK AT 11470'MD (PULLED THROUGH W/JUST A BOBBLE,DID NOT HAVE TO STOP). MAKE ADDITIONAL PASS FROM 11400'DOWN TO 11650'MD AND BACK UP-ALL CLEAN. PULL TO WINDOW. 05:30 - 07:30 2.00 DRILL P PROD1 POOH AT 1.5 BPM AT 840 PSI. FLAG PIPE AT 9800,8400 FT EOP FOR THE NEXT RUN. 07:30 - 07:45 0.25 DRILL P PROD1 PJSM. DISCUSS HAZARDS AND MITIGATIONS FOR L/D BHA. 07:45 - 09:00 1.25 DRILL P PROD1 TAG STRIPPER AND STOP PUMPING DOWN CT, LINE UP TO FEED WELL VIA KILL LINE. L/D BHA. BIT IS 1-2 WITH ONE CHIPPED CUTTER. PULL INJECTOR BACK AND SECURE IT. WELL IS TAKING>10 BBL/MIN WHILE RIG PUMP RUNNING AT 1 BPM. USE KILL MANIFOLD VALVE TO CHOKE BACK FLOW RATE TO 1.5 BPM,CONFIRMED WITH STOPWATCH AND PIT LEVEL INDICATOR. *** LAST ENTRY FOR RON EVENT FOR THIS WELL. REPORTING IS CONTINUED ON THE CON EVENT, *** Printed 10/12/2010 7:10:36PM • North America -ALASKA- BP Page 1 of 2 Operation Summary Report Common Well Name: 14-11 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/24/2010 End Date:8/25/2010 X3-00W28-C(919,600.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release: 8/25/2010 Rig Contractor: NORDIC CALISTA UWI:500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/24/2010 109:00 - 10:00 1.00 CASING P RUNPRD REMOVE BHI CABLE HEAD. MOVE CT TO HOLE IN RIG FLOOR TO ALLOW CIRC BACK TO PITS. CIRCULATE 2.5 BPM THROUGH CT AND PULL 330 FT OF CABLE OUT OF CT,NO SLACK REMAINING ACCORDING TO SLB RECORDS. 10:00 - 11:00 1.00 P RUNPRD M/U NOZZLE AND MOVE INJECTOR OVER CIRC HOLE ON RIG FLOOR. LAUNCH 3/4" STEEL BALL AND LAUNCH WITH 1000 PSI. PUMP IT TO THE BALL CATCHER AT 2.7 BPM/ 1900 PSI, BALL LANDS AFTER 48.5 BBLS AWAY. 11:00 13:00 2.00 CASING P ■- RUNPRD CUT OFF SLB CONNECTOR AND INSTALL BTT CONNECTOR. PULL TEST TO 35K, PT TO 4000 PSI,GOOD. 13:00 - 15:00 2.00 CASING P RUNPRD M/U 2-7/8"L-80 SLOTTED/SOLID LINER STRING AS PER PROGRAM. GUIDE SHOE,1 JT SOLID, 0-RING SUB,12 JTS SLOTTED,8 JTS SOLID,18 JTS SLOTTED, 16 JTS SOLID, DEPLOYMENT SLEEVE. LINER OAL= 1702.04 PLANNED LINER TOP= 10,116 FT. 15:00 - 15:15 0.25 CASING P RUNPRD CONDUCT SAFETY JOINT EXERCISE AND AAR. SAFETY JOINT WAS PICKED UP AND LATCHED INTO ELEVATORS,CROSSOVER MADE UP TO SLOTTED LINER AND SAFETY JOINT MADE UP. DRILL ENDED AT THAT POINT,LESSON LEARNED WAS DISCUSSED WITH CREW ON RIG FLOOR. 15:15 - 16:35 1.33 CASING P RUNPRD CONTINUE M/U LINER. 16:35 - 17:15 0.67 CASING P RUNPRD WHEN THE LAST JOINT OF LINER IS IN THE SLIPS SOME AIR IS FOUND ESCAPING FROM THE PORT ON THE LIFT SUB. SNIFF TEST REVEALS 0 LEL. PICK UP SAFETY JOINT WITH STABBING VALVE AND M/U TO TOP JOINT OF LINER. RUN IT DOWN AND CLOSE THE ANNULAR BOP AND THE CHOKE. CONTINUE FEEDING THE WELL 1 BPM. NOTIFY CTD SUPT AND DISCUSS PLAN FORWARD. 17:15 - 18:00 0.75 CASING P RUNPRD OPEN FLOOR VALVE AND ALLOW AIR FLOW TO BLEED OFF, FLUID MAY BE U-TUBING. 1 AFTER 30 MIN FLOW IS THE SAME,STILL 0 LEL. SHUT DOWN PUMP THAT IS FEEDING CT ANNULUS, FLOW FROM LINER TOP STOPS. 18:00 - 18:30 0.50 CASING P RUNPRD RESUME M/U LINER. 18:30 - 19:15 0.75 CASING P RUNPRD PU INJECTOR AND MU TO LINER 19:15 - 21:00 1.75 CASING P RUNPRD RIH WITH LINER Printed 10/12/2010 7:10:48PM North America -ALASKA- BP Page 2 of 2 • Operation Summary Report Common Well Name: 14-11 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/24/2010 End Date: 8/25/2010 X3-00W28-C(919,600.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:7/4/1981 12:00:00AM Rig Release:8/25/2010 Rig Contractor: NORDIC CALISTA UWI: 500292052900 Active Datum:42.90GL+28.5KB @71.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 21:45 0.75 CASING P RUNPRD STOP AT FLAG AND CORRECT DEPTH-3'TO FLAG AT 8400' WT CK AT FLAG IS 48K UP AND 30K RIH SLIGHT BOBBLE AT 11235',STACKED OUT AT 11400'AND POPPED THRU ON DEPTH AT 9400'FLAG SEVERAL SET DOWNS ALL THE WAY TO TD AT 11817.6' PU WT 56K AND SLOWLY PULLED TO 64K, RIH AND TAG AT 11818', LINE UP TO PUMP DOWN COIL CAUGHT FLUID AT 8.5 BBLS, PU TO 44K AND- RELEASED FROM LINER SHUT DOWN PUMP AND LINE UP DOWN THE BACKSIDE TO FILL THE HOLE 21:45 - 23:40 1.92 CASING P RUNPRD POOH WHILE PUMPING DOWN THE BACKSIDE+PIPE DISPL 1.5 BPM PVT 310 BBLS HOLE TOOK 214 BBLS ON TRIP OOH 23:40 - 23:50 0.17 CASING P RUNPRD PJSM TO CHECK FOR FLOW AND LD LINER BHA 23:50 - 00:00 0.17 CASING P RUNPRD OOH,CHECK FOR FLOW NO FLOW, PU INJECTOR AND USE CHARGE PUMP TO CONTINUE HOLE FILL WHILE LD BHA 8/25/2010 00:00 - 00:40 0.67 RIGD P OTHCMP STAB INJECTOR ON WELL AND CONTINUE HOLE FILL 00:40 - 01:20 0.67 RIGD P OTHCMP PU INJECTOR AND RECOVER GEOVIS FROM COIL 01:20 - 01:50 0.50 RIGD P OTHCMP STAB BACK ON WELL FILLING HOLE DOWN BACKSIDE 01:50 - 02:30 0.67 RIGD P OTHCMP LRS ON LOCATION, LINE UP TO PUMP KCL DOWN BACKSIDE DISPLACE WELL WITH 290 BBLS OF KCL PJSM WITH LRS TO RU AND PUMP DIESEL FREEZE PROTECT 02:30 - 03:10 0.67 RIGD P OTHCMP 290 BBLS KCL PUMPED, LINE UP LRS TO HP MANIFOLD AND FREEZE PROTECT WELL WITH DIESEL, RD LRS 03:10 - 03:25 0.25 RIGD P OTHCMP PJSM WITH DSM VALVE CREW TO LOAD EQUIPMENT AND SET TWC 03:25 - 05:00 1.58 RIGD P OTHCMP RU DSM TO SET TWC 05:00 - 07:00 2.00 RIGD P OTHCMP SET TWC AND PT,GOOD. CLOSE MASTER VALVE. 07:00 - 10:00 3.00 RIGD P OTHCMP PURGE REEL WITH N2. OFFLOAD EXCESS LINER FROM RIG. VAC OUT PITS,CUTTINGS BOX AND TIGER TANK. 10:00 - 13:00 3.00 RIGD P OTHCMP N/D STACK. 13:00 - 15:00 2.00 RIGD P OTHCMP INSTALL AND PT TREE CAP. TEST IS RECORDED ON SLB DATA FILE AS IA PRESSURE. RELEASE RIG AT 15:00. ALL FURTHER ENTRIES ON 13-21A. Printed 10/12/2010 7:10:48PM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 14 14-11 DIMS 500292052900 14-11AL1 Survey: MWD Survey Report - Geographic 24 August, 2010 BAKER v,04.$0 r HUGHES Survey Report-Geographic At Il. 1NTEQ t$0o Company`. North America-ALASKA-BP Local Co-ordinate Reference: Well 14-11 DIMS Project: Prudhoe Bay TVD Reference: " 42.90GL+28.5KB @ 71.40ft(42.90GL+28.5KB) Site: PB DS 14 MD Reference: 42.90GL+28.5KB @ 71.40ft(42.90GL+28.5KB) Well: 14-11_DIMS North Reference:. True Wellbore: 14-11AL1 Survey Calculation Method: Minimum Curvature Design: 14-11AL1 Database: EDM .16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 14,TR-10-14 Site Position: Northing: 5,939,577.43ft Latitude: 70° 14'26.346 N From: Map Easting: 674,150.48ft Longitude: 148°35'36.726 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.32 ° Well 14-11 DIMS API No 500292052900 Well Position +N/-S 0.00 ft Northing: 5,938,552.91 ft Latitude: 70°14'16.141 N +E/-W 0.00 ft Easting: 674,726.84 ft Longitude: 148°35'20.665 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 42.90 ft Wellbore 14-11AL1 API No 500292052960 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2009 4/5/2010 22.27 80.90 57,685 Design 14-11AL1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,365.73 Vertical Section: Depth From(TVD) +N/-S +E{/}-W Direction (ft) (ft) (ft) (0) 28.50 0.00 0.00 174.31 Survey Program Date: 8/24/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.40 7,100.40 1 :Camera based gyro multisho(14-11) CB-GYRO-MS Camera based gyro multishot 7,109.00 10,365.73 14-11APB1 IIFR(14-11APB1) MWD+IFR+MS MWD+IFR+Multi Station 10,368.00 11,818.00 MWD(14-11AL1) MWD MWD-Standard 8/24/2010 9:04:07AM Page 2 COMPASS 2003.16 Build 71 BAKER Survey Report-Geographic 1110444 LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-11_DIMS Project: Prudhoe Bay TVD Reference: 42.90GL+28.5KB @ 71.40ft(42.90GL+28.5KB) Site: PB DS 14 MD Reference: 42.90GL+28.5KB @ 71.40ft(42.90GL+28.5KB) Well: 14-11_DIMS North Reference: True Wellbore: 14-11AL1 Survey Calculation Method: Minimum Curvature Design: 14-11AL1 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,365.73 55.86 220.60 8,848.46 -3,113.18 -484.23 5,935,429.55 674,314.91 70° 13'45.522 N 148°35'34.734 W TIP 10,368.00 55.84 220.58 8,849.73 -3,114.61 -485.46 5,935,428.09 674,313.72 70° 13'45.508 N 148°35'34.769 W KOP 10,397.93 58.01 218.35 8,866.06 -3,133.97 -501.39 5,935,408.36 674,298.24 70° 13'45.318 N 148°35'35.232 W 10,426.99 64.39 216.50 8,880.06 -3,154.19 -516.84 5,935,387.79 674,283.26 70° 13'45.119 N 148°35'35.681 W 10,458.77 70.97 214.63 8,892.12 -3,178.10 -533.92 5,935,363.50 674,266.74 70° 13'44.884 N 148°35'36.177 W 10,499.16 80.17 206.55 8,902.19 -3,211.73 -553.74 5,935,329.42 674,247.71 70° 13'44.553 N 148°35'36.753 W 10,530.14 84.00 202.51 8,906.46 -3,239.64 -566.47 5,935,301.23 674,235.63 70° 13'44.278 N 148°35'37.123 W 10,560.60 87.17 195.73 8,908.81 -3,268.31 -576.41 5,935,272.33 674,226.36 70°13'43.996 N 148°35'37.411 W 10,589.60 89.66 188.32 8,909.61 -3,296.65 -582.44 5,935,243.87 674,220.98 70°13'43.718 N 148°35'37.587 W 10,619.73 86.41 182.20 8,910.64 -3,326.61 -585.20 5,935,213.85 674,218.92 70°13'43.423 N 148°35'37.667 W 10,649.41 88.62 175.36 8,911.93 -3,356.24 -584.57 5,935,184.25 674,220.24 70°13'43.132 N 148°35'37.648 W 10,679.49 89.36 168.41 8,912.46 -3,385.99 -580.33 5,935,154.60 674,225.17 70°13'42.839 N 148°35'37.525 W 10,709.46 90.83 159.67 8,912.41 -3,414.78 -572.09 5,935,126.01 674,234.07 70° 13'42.556 N 148°35'37.286 W 10,739.60 90.49 151.52 8,912.06 -3,442.20 -559.65 5,935,098.89 674,247.14 70°13'42.286 N 148°35'36.924 W 10,769.66 89.45 144.15 8,912.08 -3,467.63 -543.66 5,935,073.84 674,263.71 70° 13'42.036 N 148°35'36.459 W 10,799.69 89.02 137.01 8,912.48 -3,490.81 -524.61 5,935,051.11 674,283.30 70° 13'41.808 N 148°35'35.906 W 10,829.55 88.50 129.76 8,913.13 -3,511.30 -502.92 5,935,031.12 674,305.45 70° 13'41.607 N 148°35'35.276 W 10,859.49 88.37 124.12 8,913.95 -3,529.28 -479.01 5,935,013.70 674,329.77 70°13'41.430 N 148°35'34.581 W 10,889.42 88.13 120.47 8,914.86 -3,545.26 -453.73 5,934,998.31 674,355.41 70°13'41.273 N 148°35'33.847 W 10,919.60 87.97 117.22 8,915.89 -3,559.81 -427.31 5,934,984.38 674,382.16 70°13'41.130 N 148°35'33.079 W 10,949.56 88.93 114.08 8,916.70 -3,572.78 -400.32 5,934,972.05 674,409.45 70°13'41.002 N 148°35'32.295 W 10,979.88 89.60 110.71 8,917.09 -3,584.33 -372.29 5,934,961.15 674,437.73 70° 13'40.889 N 148°35'31.481 W 11,013.61 89.97 106.96 8,917.22 -3,595.21 -340.37 5,934,951.01 674,469.89 70° 13'40.781 N 148°35'30.553 W 11,039.73 89.75 103.98 8,917.28 -3,602.18 -315.20 5,934,944.63 674,495.21 70°13'40.713 N 148°35'29.822 W 11,069.55 89.69 100.53 8,917.42 -3,608.51 -286.07 5,934,938.98 674,524.49 70° 13'40.651 N 148°35'28.976 W 11,102.12 89.11 96.95 8,917.77 -3,613.46 -253.88 5,934,934.78 674,556.77 70° 13'40.602 N 148°35'28.041 W 11,129.62 88.09 94.27 8,918.44 -3,616.14 -226.52 5,934,932.72 674,584.19 70° 13'40.576 N 148°35'27.246 W 11,159.76 86.81 91.19 8,919.78 -3,617.58 -196.45 5,934,931.99 674,614.28 70° 13'40.562 N 148°35'26.372 W 11,189.43 85.45 87.78 8,921.78 -3,617.31 -166.86 5,934,932.94 674,643.86 70° 13'40.564 N 148°35'25.513 W 11,219.77 84.78 84.38 8,924.37 -3,615.25 -136.70 5,934,935.70 674,673.96 70° 13'40.584 N 148°35'24.637 W 11,252.83 84.44 80.12 8,927.47 -3,610.81 -104.10 5,934,940.89 674,706.45 70° 13'40.628 N 148°35'23.689 W 11,279.67 83.29 79.05 8,930.34 -3,605.99 -77.85 5,934,946.32 674,732.57 70°13'40.676 N 148°35'22.927 W 11,311.02 82.18 76.31 8,934.31 -3,599.35 -47.47 5,934,953.66 674,762.79 70°13'40.741 N 148°35'22.044 W 11,339.74 81.39 72.93 8,938.41 -3,591.81 -20.07 5,934,961.83 674,790.01 70° 13'40.815 N 148°35'21.248 W 11,369.66 81.03 68.75 8,942.99 -3,582.11 7.86 5,934,972.17 674,817.70 70°13'40.910 N 148°35'20.437 W 11,399.73 81.84 66.09 8,947.47 -3,570.70 35.31 5,934,984.22 674,844.88 70° 13'41.023 N 148°35'19.640 W 11,429.79 84.56 64.73 8,951.02 -3,558.28 62.45 5,934,997.27 674,871.72 70° 13'41.145 N 148°35'18.851 W 11,459.77 86.44 61.95 8,953.38 -3,544.87 89.15 5,935,011.29 674,898.10 70° 13'41.277 N 148°35'18.075 W 11,489.53 88.31 60.04 8,954.74 -3,530.45 115.15 5,935,026.30 674,923.76 70°13'41.418 N 148°35'17.320 W 11,519.86 87.94 56.30 8,955.73 -3,514.47 140.90 5,935,042.88 674,949.13 70° 13'41.576 N 148°35'16.572 W 11,549.68 87.73 52.76 8,956.86 -3,497.18 165.16 5,935,060.73 674,972.99 70°13'41.746 N 148°35'15.867 W I 11,581.92 88.34 49.33 8,957.97 -3,476.92 190.22 5,935,081.55 674,997.56 70°13'41.945 N 148°35'15.139 W 11,609.91 90.09 46.07 8,958.35 -3,458.09 210.91 5,935,100.86 675,017.81 70°13'42.130 N 148°35'14.538 W 11,644.77 88.99 41.74 8,958.63 -3,432.98 235.08 5,935,126.52 675,041.39 70°13'42.377 N 148°35'13.836 W 11,674.85 87.54 38.42 8,959.54 -3,409.98 254.44 5,935,149.96 675,060.21 70°13'42.603 N 148°35'13.273 W 11,704.64 87.67 34.86 8,960.79 -3,386.10 272.20 5,935,174.24 675,077.41 70° 13'42.838 N 148°35'12.757 W 11,734.68 89.23 31.45 8,961.60 -3,360.97 288.62 5,935,199.75 675,093.24 70° 13'43.085 N 148°35'12.280 W 11,764.60 89.36 28.29 8,961.97 -3,335.03 303.51 5,935,226.03 675,107.53 70° 13'43.340 N 148°35'11.848 W 11,774.90 89.48 26.79 8,962.07 -3,325.90 308.28 5,935,235.27 675,112.08 70° 13'43.430 N 148°35'11.709 W 11,818.00 89.48 26.79 8,962.46 -3,287.42 327.70 5,935,274.18 675,130.61 70° 13'43.809 N 148°35 11.145 W TD-2 7/8" 8/24/2010 9:04:07AM Page 3 COMPASS 2003.16 Build 71 TREE' FMC 1NELLHEAD= GRAY 1 4-11 A SAFI CHROME TB: WELL ANGLE>70°@ 10459' ACTUATOR= BAKERC �� KB.ELEV= 71' ,BF.ELEV KOP= 5200' Max Angle= 91 @ 11610' ' 2221' 1---I4-1/2"HES X NIP,ID-3.813" Datum MD= 10406 Datum TVD= 8800'SS 3150' I-1 EST TOP OF TIEBACK CMT I 13-3/8"CSG,72#, L-80,ID=12.347" --I 2651' . GAS LIFT MANDRELS (V�1 /*1 ST MD TVD DEV TYPE VLV LATCH PORT DATE 1*1 X44 5 3166 3166 1 KGB-2 DOME BK 16 08/31/10 14.1 I. 4 4743 4743 0 KGB-2 SO BK 20 08/31/10 Minimum ID =2.370" @a 110117' l• o•1*�1 3 6112 6021 33 KGB-2 DMY BK 0 08/15/10 *1 1 2 7320 7004 44 KGB-2 DMY BK 0 04/13/10 3-1/2" X 2-7/8" XO A *4 1��1 •'1 1 8822 8004 57 KGB-2 DMY BK 0 04/13/10 •1 •1 1••1 ••1 6930' H7'BKR PORTED TIEBACK SEAL ASSY,ID=6.16" I 7"TIEBACK CSG,26#,L-80 6930' _I :11 I 6930' I—17"X 9-5/8"BKR C-2 ZKP LTP,ID=6.29" I ITC-IVBTC-M,ID=6.276" 6945' H9-5/8"X 7" BKR HMC LNR HGR,ID=6.276" 9-5/8"CSG,47#,SOO-95 BTC,ID=8.681" -I 7109' I--- 9-5/8"MILLOUT WINDOW(14-11A) 7109'-7125' ' I 10067' I—i4-1/2"HES X NIP,ID=3.813" I 0:,. // I 10088' I--17"X 4-1/2"BKR S-3 PKR,ID=3.875" I ' I 10111' I-14-1/2"HES X NIP, ID=3.813" I I 10116' H3-1/2"DEPLOY SLEEVE,ID=2.970" I 10117' —I3-1/2"X 2-7/8"LNR XO,ID=2.370" I 4-1/2"TBG, 12.6#, 13CR-84 VAM TOP, —1 10143' ' Ii 10130' --17"X 5"BKR ZXP LTP w/TIEBK SLV,ID=4.41" I 0152 bpf,ID=3.958" 10131' 1-14-1/2"HES XN NIP,ID=3.80"(MILLED 08/03/10) I 7"LNR,26#,L-80 BTC-M, -/ 10330' 10143' H4-1/2"WLEG, ID=3.958" BEHIND 0383 bpf,ID=6.276" / I 10152' I--17"X4-1/2"BKR HMC LNR HGR,ID=4.41" CT LNR 4-1/2"MONOBORE WHIPSTOCK(08/19/10) H 10370' 10159' I—I5"X 4-1/2"XO, ID=3.96" PERFORATION SUMMARY REF LOG: SPERRY SUN MWD DGR 08/29/05 4-1/2"MILLOUT WINDOW(14-11AL1) 10369'- 10377' ANGLE A T TOP PERF: @ III I Note:Refer to Production DB for historical perf data SIZE I SPF 1 INTERVAL 1Opn/Sqz1 DATE ' • , \ it)�h 0,,f) 14-11A \ \ C0 `t 2 2-7/8" 6 10325-10328 0 03/21/10 I I $LA� ( N u G 2-7/8" 6 10328-10348 0 03/21/10 I I \ 4-1/2" SLTD 10412- 10650 0 09/14/05 TD 11785' 4-1/2" SLTD 11146- 11802 0 09/14/05 MID I I \ 14-11AL1 \ I14-11A \ 2-7/8" SLTD 10617- 11172 0 08/25/10 \ I 2-7/8" SLTD 11417- 11785 0 08/25/10 \ 'L 2-7/8"LNR,6.16#,L-80 STL, 11818' 4111t '4-1/2"LNR, 12.6#,L-80 BTC/113T-M, —1 11804' ►"., .0058 bpf,ID=2.441" .0158 bpf,ID=3.958" :-:0,:.-: DATE ' REV BY COMMENTS 1 DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/04/81 PKR 191 ORIGINAL COMPLETION 09/19/10 MK/PJC FINAL DRLG CORRECTIONS WELL: 14-11A 09/16/05 N2ES SIDETRACK(14-11A) PERMIT No: 2051260,2100940 08/26/10 NORDIC?CTD SIDETRACK(14-11AL1) API No: 50-029-20529-01,(61) 08/29/10 PJC DRLG DRAFT CORRECTIONS SEC 9,T1 ON,R14E,1760'FEL&1776'FNL 09/01/10 CSR/PJC PERF CORRECTIONS 09/01/10 JLJ/AGR GLV C/O(08/31/10) BP Exploration(Alaska) sirAil D [F ALAsEA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-11AL1 BP Exploration (Alaska), Inc. Permit No: 210-094 Surface Location: 1776' FNL, 1759' FEL, SEC. 09, T1ON, R14E, UM Bottomhole Location: 5021 FNL, 1359' FEL, SEC. 09, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditio. : .f this permit may result in the revocation or suspension of the permit. Sincer-1 r f, I Q Dan eir" . -- . .nt, r. r Chair DATED this 7!hday of July, 2010. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECE%VED� W ALASK L AND GAS CONSERVATION COMMIS N -/9./0 PERMIT TO DRILL JUL 1 5 2010 20 AAC 25.005 _A1t (r�.�,� 1a.Type of work: lb.Proposed Well Class: J1laS(il $ f 16$1k�S61011 ®Development Oil 0 -Winj 0 Zon osed for. ❑ Drill 0 Redrill ❑ Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coa b�Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 14-11AL1 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12100' TVD 8895'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028312 1776'FNL, 1759'FEL, SEC.09,T1ON, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4942'FNL,2296'FEL, SEC.09,T10N, R14E, UM September 1,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 5021'FNL, 1359'FEL, SEC.09,T10N,R14E, UM 2560 15,160' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 71.4' feet 15.Distance to Nearest Well Open Surface: x- 674727 y-5938553 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 1,980' 16.Deviated Wells: Kickoff Depth: 10395' feet 17.Maximum Anticipated Pressures in prig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3296 Surface: 2416 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length. MD ND _ MD ND (including stage data) 4-1/8" 2-7/8" 6.4# 13Cr STL 1980' 10120' 8637'ss 12100' 8895'ss 97 sx Class'G' ' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 11804' 9032' None 11804' 9032' None Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 300 sx Permafrost 110' 110' Surface 2651' 13-3/8" 1640 sx Fondu.400 sx Arcticset II 2651' 2651' Intermediate 7109' 9-5/8" 500 sx Class'G' 7109' 6843' Production Liner 10306' 7" 168 sx Class'G'.480 sx Class'G' 10330' 8828' Liner 1674' 4-1/2" Uncemented Slotted Liner 10130'- 11804' 8714'-9032' Perforation Depth MD(ft): 10325'-11802' Perforation Depth ND(ft): 8825'-8909' 20.Attachments: ❑ Property Plat ®BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ❑ Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the -•of•• is true and correct. Contact Wilmer Hoffman,564-4592 Printed Name J.4 .411- Title Engineering Team Leader /411././F ' Prepared By Name/Number. Signature / Phone 564-5153 Date 71,—/, Teme Hubble,564-4628 C o m mission Use Only Permit To Drill API Number: Perm' al ate: See cover letter for Number: aJ0094 50-029-2052940-00 /j jt I other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: le Other: S O / S` OP r CS f Samples Req'd: 0 Yes 'No Mud Log Req'd: ,❑/Yes YJ No k-2 5-Pc) (S� n n LA--(4,- (eJ/- "~~—) HZS Measures: V'Yes ❑ • 'Directional Survey Req'd: fa Yes ❑No if q/ I i ' APPROVED BY THE COMMISSION Date �if� ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the'! of a'rral(20 AAC 25.i 15(g)) Submit In Duplicate 0 RIGINAI 7 Z6_w /r i(4- O( L •/ZO/V DS 14-11AL1 — Coiled Tubing Ming To: Chairperson Alaska Oil & Gas Conservation Commission bp From: Wilmer Hoffman CTD Engineer Date: July 13, 2010 Re: 14-11 AL1 Application for Permit to Drill Request CTD Drill and Complete 14-11AL1 program: Spud in September 1, 2010 Pre-Rig Work: (scheduled to begin August 1, 2010) • 1. S Dummy off GLVs (done 4/13/10) f} s: 2. F MIT-IA to 3,000 psi. MIT-OA to 2,000 psi. (passed 4/14/10) 3. W Function LDS. PPPOT-T (passed on 4/2i/10) �n+ 6.-4/5 4. V Set TWC. PT SV, WV, MV. Pull TWC. . iv;(( X 5. O Bleed production flow lines and GL lines down to zero and blind flange 6. 0 Remove S-riser, wellhouse, level pad • r 7. F Load and kill prior to rig's arrival.' [o 8. V Set BPV. Rig Work: (scheduled to begin around September 1, 2010) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. Pull BPV. 2. Set 4-1/2" monobore whipstock at 10,375'. —� Fie•. +kr.. w�:pS �l� 3. Mill 3.80" window at 10,375' and 10' of rathole in Zone 4. Swap the well to Power-Vis. 4. Drill Build/Turn: 4.125" OH, 500' (22 deg/100 planned) with resistivity 5. Drill Lateral: 4.125" OH, 1,225' (12 deg/100 planned) with resistivity 6. Run 2-7/8"chrome liner leaving TOL at 10,120'• 7. Pump primary cement leaving TOC at 10,600', 20 bbls of 15.8 ppg liner cmt planned 8. Cleanout liner and MCNL/GR/CCL log . MSc rift i 60, eel_ poss.b-G 9. Perforate liner per asset instructions (-400') • 7---z 4-fz' 10. Freeze protect well, set BPV, RDMO. • Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. SBHPS. 3. Generic GLV's 4. Test separator 13 July 2010 DS 14-11AL1 — Coiled Tubing urilling Mud Program: • Well kill: 8.6 ppg seawater/brine • Milling/drilling: 8.6 ppg Power-vis or biozan for milling, new Power-vis for drilling • Swap to seawater/brine if losses encountered Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. . Hole size: 4-1/8" bi-center or 3-3/4" gauged Casing Program: • 2-7/8", 6.4#, 13Cr, STL 10,120' MD - 12,100' MD • A minimum of 20 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 10,600'MD) • Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line— 15,160' South • Distance to nearest well within pool — 1980' (14-10 producer) Anticollision Summary • No anti-collision issues. Logging • Resistivity, MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole GR/CCL/CNL log will be run. Hazards • The maximum recorded H2S level on DS 14 is 590 ppm on well 14-21 (07-16-1995). • Lost circulation risk is high. One fault crossing expected between 11,400'— 11,600'. Reservoir Pressure • Reservoir pressure is estimated to be 3,296 psi at 8,800'ss (7.2 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,416 psi. Wilmer Hoffman CTD Engineer 13 July 2010 DS 14-11AL1 — Coiled Tubing urilling TREE= ;RAY GEN2 SAFETY NOTES: "'CHROME TBG"" WELLHEAD= GRAY ACTUATOR 14-11A ACTUATOR= AXELSON KB.ELEV= 71' BF.ELEV= KOP= 10430' 1-'-'--1 21' H13-5/8"X4-112"X0.ID=3.90" Max Angle= )1 @ 11704' Datum MD= 10406 u.................................._......_.........---...._ 2221' H4-112"HES X NIP,ID=3.813" Datum-ND= 8800'SS 13-318"CSG,72#,L-80,ID=12.347" -I 2651' 4 ■ 3150' HEST TOP OF TIEBACK CMT GAS LIFT MANDRELS {(;' I ST MD TV D I DEV I TYPE I V LV (LATCH PORT DATE 5 3166 3166 1 KGB-2 DOME BK 16 01/20/10 4 4743 4743 0 KGB-2 DOME BK 16 01/20/10 Minimum ID=3.725" e 10131' 3 6112 6021 34 KGB-2 DOME BK 16 01/20/10 4-112"XN NIPPLE 2 7320 7004 44 KGB-2 DOME BK 16 01/20/10 1 8822 8004 57 KGB-2 SO BK 28 01/20/10 Ch IC r.. ':V ::: 6930' HT BKR PORTED TIEBACK SEAL ASSY,ID=6 16" I 7"TEBACK CSG,26#,L-80 H 6930' I I 8930' H7"X 9-5/8"BKR C-2 ZKP LNR TOP FKR,ID=6.28" I TC-IVBTC-M,ID=6.276" 9945' H9-518"X 7" BKR HMC LNR HNGR,ID=6.29" I FC i.:1:i, f4 4111174/10' 7476' '' i WHIPSTOCK(08129105) H 7115' 10067' H4-1/2"HES X NIP,ID=3.813" I •V?. 9-5/8"CSG,47#,L-80/S00-95,0=8.681" --I 7109' 10089' H7"X 4-1/2"BKR S-3 PKR,ID=3.875" I 10111' H4-1/2"HES X NIP,ID=3 813" I EZSV(08/29/05) -I 7131' 10130' _-7"X 5"BKR ZXP LTP A. �• w/TEBK SLV,ID=4.41" , '4\ 10131' —14-1/2"HES XN NIP,ID=3.725" I Ai 4` 10143' 41/2"WLEG,ID=3 958" HELMD TT NOT LOGGED 14-1/2"TBG,12.6#,13CR80 TOI,.0152 bpf,ID=3.958" H 10143' N- 10152' I-17"X4-1/2"BKR HMC LNR HNGR,D=4.41" , \ 10159' —5"X 4-1/2"X0, 7"LNR,26#,L-80 BTC-M,.0383 bpf,ID=6.276" —I 10330' .N. ♦ D=3.96" • • PERFORATION •SUMMARY ♦• \ • REF LOG: SPERRY SUN MMMD DGR 08/29/05 ANGLE AT TOP PERF 56°@ 10325' \ • Note:Refer to Roduction DB for historical pert data • SIZE SPF INTERVAL Opn/Sgz DATE ♦ ♦♦ 2-7/8" 6 10325-10348 0 ' 03/21/10 ♦♦ • SLID 10412-10650 0 09/12/05 SLTD 11146-11802 0 09/12/05 •♦♦ ♦♦ • • • 14-112"SLTD/SOLID LNR,12.6#,L-80 BTC/IBT-M,ID=3.958" I— 11604' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/041111 ORIGINAL COMPLETION 01/15/09 DAV/SV GLV C/0(01/09/09) WELL. 14-11A 09116/06 JNC SIDETRACK(14-11A) ' 12/12/09 'RCT/SV GLV C/O(12/03/09) FERMIT No'2051260 09/23/05 DAV/PJC GLV Cr0 -02/04/10 'DAV/PJC_'GLV C/O(01/20/10) API No 50-029-20529-01 10/13/05 TWCJPJC GLV C/O 04/02/10 ' K,.B/SV ADD FERF(03/21/10) SEC 9,T1ON,R14E,1282 11'FEL&4513 86'FNL 11/05/05 SGS/TLH DRLG CRAFT CORRECTIONS 10/17/08 DAV/PJC XN NIP D CORRECTION BP Exploration(Aluka) 13 July 2010 DS 14-11AL1 - Coiled Tubing urilling TREE= :RAY G A Y Y V�LHEAD= GRAY 1 4-11 A L 1 SAFETY NOTES:"'CHROME TBO'"" - --------------------- ACTUATOR= AXELSON Proposed CTD Lateral KB.ELEV 71' P BF.B_EV= zi___' KOP= 10430' I 21' I--13-518"X4-1/2"X0,1D=3.90" Max Angle= )1 @ 11704' Datum MD= 10406 — - - - - - 2221' -14-1/2"HES X NIP,ID=3.813" Datum TVD= 8800'SS 13-3/8"CSG,72#,L-80,113=12.347" -1 2651' , 3150' I1EST TOP OF TIEBACK CMT I GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH FORT DATE 5 3166 3166 1 KGB-2 DOME BK 16 01/20/10 }ti' 4 4743 4743 0 KGB-2 DOME BK 16 01/20/10 Minimum ID =2.30"@ 10120' 3 6112 6021 34 KGB-2 DOME BK 16 01/20/10 TOL CTD 3-1/2" ..,......, ..,..,. 2 7320 7004 44 KGB-2 DOME BK 16 01/20/10 1 8822 8004 57 KGB-2 SO BK 28 01/20/10 ...0 6630' H7"BKR FORTED TIEBACK SEAL ASSY,ID=6.16" I 7"TEBACK CSG,26#,L-80 6930' 1 I 6930' 1-7"X 9.5/8"BKR C-2 ZKP LNR TOP FKR,ID=6.28" I TC-IVBTC-M,D=6.276" r 6945' 1-19-5/8"X 7" BKR HMC LNR HNGR,ID=6.29" I Fie: Xei 1"u_I_WI mIww • !.A AA Al 74/10* 74.11C• WHIPSTOCK(08/29/05) --I 7115' I 10067' I-14-,1/2"HES X NIP,ID=3.813" 9-5/8"CSG,47#,L-80/S00-95,D=8.681" -1 7100' 10061 H 7"X 4-1/2"BKR S 3 PKR,ID=3.875" I 10111' 1--14-112"HES X NIP,ID=3 813" I IQSV(08129105) -I 7131' , D 10130' 7"X 5"BKR ZXP LTP _"-. • w/TEBKSLV, =4.41" No -4-1/2"HESXNNP, •. 10131' ID milled to=3 80" 10120' -ITOL D= 2 30",OD 3 70" , ` 10143' H4-112"WLEG,ID=3.958" N, -IELMD TT NOT LOGGED [4-1/2'TBG,12.6#,13CRB0 TCII,.0152 bpf,D=3.958" 10143' N. 10152' I—{7"X 5"BKR HMC 7"LNR,26#,L-80 BTGM,.0383 bpf,ID=6.276" 10330' \ LNR HNGR,D=4.41"• 14-1/2"man obore W " -mg OD 3.625 ID0.70" H 10375' . • 10159' 15"X4-1/2"X0, � ♦ ID=3.96" PERFORATION SUMMARY -- . ♦ REF LOG: SPERRY SUN MVb)DGR 08/29/05 (CN ANGLE ATTOPPERF: 56°@10325' -10600' TOC Note:Refer to Production DB for historical perf data 12-7/8"13Cr CMTD LINER H 12100' I SIZE SFF INTERVAL Opn/Sog DATE 2-7/8" 6 10325-10348 0 03/21/10 SLTD 10412-10650 0 09/12/05 SLTD 11146-11802 0 09/12/05 ♦ ♦♦ I4-1/2"SLTD/SOLID LNR,12.6#,L-80 BTCIIBT-M,ID=3.958" H 114' DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 08104111 ORIGINAL COMPLETION 01/15/09 DAV/SV GLV C/0(01/09/09) VVEL: 14-11AL1 0806,36 JNC "SIDETRACK(14-11A) 12/12/09 RCT/SV GLV 0/0(12/03/09) PERMIT No 09/23/05 DAV/PJC GLV C/0 02/04/10 DAV/PJC GLV GO(01/20/10) API No: 50-029-20529-02 10/13/05 TVVC/PJC'GLV C/O 04/02/10 K..B/SV'ACD PERF(03/21/10) SEC 9,T1 ON,R14E 1282.11'Fa&4513.86'FNL 11/05/05 SGS/TLH�DRLG DRAFT CORRECTONS 04/21/10 MSE FROFOSED CTD LATERAL 10/17/08 DAV/PJCXN NP 0 CORRECTION BP Exploration(Alaska) 13 July 2010 DS 14-11 AL1 — Coiled Tubing urilling All Measurements are from top of Riser 7/7/2010 i (n CC 14-11 AL1 top of bag r 1 BAG 7 1/16" 5000 psi J bttm of bag middle of blind/shears Blind/Shears I TOTs middle of pipe/slips I 2 3/8" combi ram/slips 71/16" 5000 psi 0 I Mud Cross Mud Cross middle of flow cross 7 1/16" 5000 psi middle of rams 2 3/8" x 3 1/2" VBR's I TOTs middle of pipe/slips - 2 3/8" combi ram/slips 71/16° 5000 psi I [Swab Valve_. Flow Tee 13 July 2010 1 v- . M 0 0 0 0 0 CA O 0 N N- 0 0 N N. IN O v O o o O co o 0 0 - — o o O o `fib m o O o 0 0 0 D) ci 0 ci ci ci o 0 0 O M N (O m T � m O) O) O) 3 co 4 x d o RI 0 e- m H + .r O J CD ..( O N O O V u) N N- O) N r co c0 V U) N CO CO CO N n 0 N N- co co N- CO CD CO CO 0) 0 (f) N Q 0 0 Cf; 0 O) U) co O O CM N 0 Lri O n a 0 ❑ 0 O O O) r co O LO u) CO D N CO 0 m (n 0 0 () co co CO u) (() u) u) L0 CD CO N. N. CO 0 CO to E U a) °f _ m z c Y co U) CD • Z co 0 rn 0 0 0 0 0 0 0 0 0 0 0 0 0 J O 7 r- 0 O) O O 0 O O O O O O o O 0 O N 0 CO O O N N N N N N N CV N N N N m N J E O N N N N N N N N N 4 CO 0 7 N 00 c cc N O o C ci 0 O 2VF-' 2 ❑W d - CD N V V 0 0 CO u) CO CO 0) 0) 0 o -� O) 0 u) N V O CO (N 0 CO V CO O) CO N C 0 Ti O m M C°) c0 7 O r N CO O co r 0.. t a) a) U) co N 0 CD N- 0 CO CO N C co CO N N N N N N N N N CO V '0 N R ' V V V 4 C' V C V V V V V V V n r- N- N- N- I N- N. N. N N. N- N- N C `-' CD CD CD CO CO Cfl CO CD CO (D Cfl CD CO CO CD W O W CO 0 C o af d - y c Q ` C t) w O U) CO N. CA 0 N CO 0 0 N N- CA CO CO 41 ` w (a > (0 u) Co co co O co U) CO CO ,- CO (O CO CO CO CO O d w co 'i Of N N O f O 1 M V V' a) N 0 6 C6 CD O m C 0 O` ....2 C V V V 4 co co co N N ,- O 0) a) a) Co d (a T 00 r u) U) U) u) u) U) Ui U) U) Ui Ui v v V V J F � 2 N � ( C co co a) a) a) co co co co 0) 0) 0) 0) 01 0) c (�/) C Z U) U) u) U) U) (f) u) (f) U) u) (fi u) U) U) u) F C ° _a � •- C a m Z C + CO N CD CO 0) 0 u) CO N. N. V N- Co 0 0 ❑ ❑ N N 0 CO V CO V CO N N CO V N. CO O y m V CA O N h N N- N N N U) U) cO N U) (o 0 U . CO Co 0 0 v CO N- 0 N 0 (D v N. CO 0) U, 1' Y (n (n (r) (n (n co m co co (n (n 'T M � w = I__ 2 Z L N cp W ,C CO a0 CO 0 O O CO CD CO N 0) CA a) Y a O r` O N 0 N CO N V 0) r CO C7 03 O 0 + M m 7 CO CO m N O n O O M CO = E o co 0 0 N CO CA a) co u) O CO CO 10 �' N N N N CO V' u) U) CO CO m Z 47 (A 0:5- ) r ? C'.5 o r) `'..i ∎ c c?i C) c c a N ' ❑ � m as F U Z I _ _ _ _ co r CO N N 0 CO N CD N CO I 0 (N N CI) CO r` 0 CO N CO LO CO M 0 V N- N CO u) U) O V (O CO u) U) u) u) U) U) r` CO O) a) N CO CO CO CO CO CO CO CO CO CO co N- r• N- r` CO CO CO CO O CO CO CO CO CO CO o CO O cO CO CO CO CO o5 O co co- O cO O O O .D ,- > m O Q Q >+�' ,_ O a) a) a) Cr) 0 CA CO 00 00 CO CO CO CO 00 CA co V V V V r` CA 7 0) 0) O) V V V 7 2 0 .�C O O O O O r` V u1 O) r (f) O) CO V N p ID Q' .- N N N N N 0 0) N- U) CO CO m LL N N N N N N N N T- CL 3 -CM m �- Q O o a a i ! ! U to co r-- u) u) Co .- co Co N N N ,- O J O O O J 0 0 M O U) u) n J O u7 O) d O O ci O O 0 O O O m Q i v N- O U LO U) 0 (n h. N- co a) ma) ma) a)U O O o co 0 o Lri O V O 0 •N m O ^ CO C „. T.- Q o ~ r;0C a`) D ✓ -LO 0 4- c c a E m o 2 m4 co m d 0 Z a d d d C V o0 M 0 0 0 0 O 0 0 O 0 0 0 0 N O 0 0 a tri■„ 0 O O O O O O O O O O O N O O O d 00 00 Z U) ai ui w O (f) O (ri U) 0 0 O (fi w O O O f o co co r- a) 0 0 r 0 N r- O O O N- 0 0 0 0 (-j O E 7 co co a co .p u) U) U) CD N. CO CO .p O) O c y o r 0 N 0 o _a o O o c o 0 0 0 0 0 0 0 o c 0 v CS) CL• it to 12 co o • w d N d 7 c co N t) aco) 0 v) a rn r. ` . M 7 O O) O) CO O O 7 O N 0 CO C) CO O 0 N. MI o o CD U) CO O CO O o o LO o N 6 m AOC O M N N O O) co M N O C) O O) C) to ` to m O) O O O O 9' c0 9 I� r c0 )� m W W co 3 �' to a) e co m W N 6 co (`i Z J i... O i■n 0 CV O CO C) 7 O N U) O CO N. U) O 7 N O 7 CID CO CO N .-- 00 N. O) m CO 01. (O N 7 U) N CO O r Q N (fl M O co 7 (O U) 7 (O C) U) CA M Q- v 0 N- a) O W 7 U) N CO (O )- O 7 )• N- CA Z CA CA O _ N N CO CO CO CO 7 7 7 7 7 7 0 r D � cD > To) _ m c c a) Y ( U) Ja) • Z (o 0 0 o 0 0 0 0 o 0 o o o o 0 o 0 co o A- O 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 + C.) ri N N N N N N N N N N N N N N N N O d cm a) a) of 3 0 Cl °csi 27H2w �- N W 7 N CO U) N- O CO 0 N- N CO O U) CO O .•• m U) .- U) O U) CO CO U) 0 c0 N N- CO CO N. 0 oO M M N 7 c0 r O) U) 7 M 6 N C) '.. L CO N N N CO CO CO CD M U) O Cfl N- 0 tt C V U) CO N- I. co CO Cr) O) O O O N o a) 7 7 7 7 7 7 7 7 7 7 U) U) N) U) U) U) y r` CO r` re CO CO CO co CO C CO CO CO CO CO CO CO CO CO CO ?; o W aw o c a) E. ) 0 a. 3` c V CO N 7 O CO N- M O U) N CO CD N- 10 N- Q w (p M r CO M 7 N O M c0 f'- U C) CO 0 O e t („0 N '. Ce T (6 p) 7 CO CO 7 N. CO CO 7 O N N. m 7 CO U) a0 o Ix &I t a) d c ao c0 c0 c0 c0 c0 m 0 O O O O — N N CO d (p 1p 7 7 7 7 7 7 7 4 U) U) U) U) U) U) U) U) p Q Q O 7 A co co co Cr) CO CO CO CO Cr) CO rn CO CO CO CO Cr) a J 2 Z fA Q O Ui U) U) (n Ui Ui Ui Ui Ui U) U) U) U) U) U) 0) Z W I— E Z C co 7 co CO O 7 CO N U) N. C) (O N O CO CO CO 0) CO U) O CO M M N C) N- 7 CO CO m 6 O N N- CO O (O )- (O CA )- CA )- co co O) N co O to )- N 7 CA U) CO 0 d d M N N N N CO CO 7 CMw ui = z co G) L N N 7 7 CO N O O U) O M 0 f• )• Y ch in f-- Cn I-- U) f, CA in 7 M (O .- O CD in N e} • D Ti O U) M M (Ni f- U) CO U) M O U) N CO 1 O O O c0 N O U) M CO CO CO O 7 I� h CO CO (D t0 U) U) 7 7 7 CO M N CO U M M M M M C's,; M M M M C':; M M M M M) Y Z CD CO N O CO U) CO (0 O N CO U) CO 0) 7 O CO O) O 7 co O co N 7 0 I� M O CO N CO CO . . 7 U) co; CO U) . 7 N M f) O Q) N N 7 co co co 7 co co CO CO 00 00 CO O) O) CO U) CO CO 00 CO 0) 0)CO 00 O 00 W 00 W 00 00 00 CO CO U) U) �' O W CO W CC) c0 W aD O a0 CO O 00 O 00 CO H CO O U) co CA co N- 7 U) N N- N- N N- CO • U) CO O O O 7 U) • M CO M M M M O 00 f� ao U) M O W N- O CA O U) O O c0 N- (fl CO U) U) 7 CO 7 U) 7 N N CO C- °v • c Y co N- O co .-- O N- N CO 7 CO CO N- N 0 Cr) Cr) Q O 7 r N 7 7 N- 00 U) 7 0 CO CO N- I- 7 J O CA (O 7 N N N N U) CO O 6 00 ao 6 ao N Q co co co co CO CO CO 00 co W CO co c0 CO co co . U >. Co o c as u� r E m 7 c N LL u U7 U) co o 2 m � N m o v Z a d a s T o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a O O U O O O O O O O U) O O O O O U O co O U O O O U O O O O O U O N O N- 0 0 0 1� O O N 0 N O N O O N O N CNI 3 N CO 7 7 U) CO CO )� h CO CO O) 0 0 R �- .4; O • a) co O) r H O 0 O. a o) c as o 0 a m 3 3 Q a. • W Mo n. a miligD 0, o ar to N- N o N- v in `0 m= W o .a F + 3 C CO ao (0 M rn M J CO (n CO Co N 00 0 C M M in M M in M M M in N O J OD m a 0 °N z z z z z z z U p co ` CCO N V N N M a` 0 In O O) In to O V 2 'p (n N N O M (O O m 3 C w- V V (n V (n . V N Y m CO i+) En En i) En "r) C') (n O Z CO J C) 3 J N U 0 0 0 0 0 L. 0 - m Mo � N- N- r` r` r` r` - m _1 E . ci) 0 3 N • C O E = 04 CD •- O O O O 0 O 0 a) a) a C p O O O O O o O 2 v H A W rn o O 0 r` rn O rn v rn rn rn co 0 N N r` CO N M to ot C r 4' N- 4: co- N- N C 'i •0. O O O O co O co O t W 4- d CL d C N CO w a1 r O O 0 O 0 0 0 y - `' C aj 0 to O O O O O O O d 0 O' V is C CC) N ii, c N 0 V ,_ N N- N co U) W = co '- 0) d V y C M M M M M M M 0 R M L > O O co O O O) O) a :°. O in (ri (ri (ri (ri (ri (ri n co ar J I- Z U) O Z c 0 r` C �.-. N W C) R E ` H 'C U Q Z C (0 cm u) r- N- N Q. 7 0 00 N M un O 6 co CD rg �j O) (a O W Ni O to O (n (n M W CD � +... W W = Z W W M �j M W W M (,.) co co M V L CU M� N co COO 0� V 0 (n� ::: O o v 0 O�� mZ .-4(n N O Z Mz NN M O ' N cn v (ri O M N(O M M O 0 O d Od O� f00 a CO 01 CO~ m(O CO a)a))(O QO)M COH O V co 00 OO 00) V 00 O) (n o t[) o co v 0o M co ti co CO CO O CO CO CO CO CO 0 CO O 0.° O g O O O= O o 0.° O as Og O• OO --co O a a N- o r` N m CU CU ° CO m @ m @ 0 co CD In V Z= ((a 4 N C 0= V w co° m 'I co 0o Oo O� °� Oo 00 °n am r- co co O V 0 V °r- O' 00 Opp 04 0) 0 O Cr) O co O O M o V O N O M 0 C co co a a) r r J c T T T T >. T U T v �• 0 sp U) U) N N N N U) r` O ▪ @ O c c c c c c c •O M O E 0) ,- co a) a) 0 0 C) C) N r 0 0 U) M O L .co fA (17 (n N d d d N N U) - d^ M "O O C C O; O: O) 07 CC O: O: d 0 O N O 2 m 0 m y as m m CU CO m �`l 2 Z a a a s 0) u) U) u) U) Cl) (0 co Q to V N (U/1 O N M N N. N (n N N (/) w T j N N 4 o 4•N V•N 4•N V•N N V.N E m 0 H E c HE, H E H E H E c H E H E C n '£ O c c c c c c c c c ,- cc d o N V 0 C Z ) to U)•p • ( ,O as ,p (0.p, W c p •.• � w a 0 t N a as a as a as a as a as a as a as 0) 01 d d vacn33o H I--0 61 V rn IN N W logZ '13 • We 4 Xi = a co co W F + o Z 0 o O Cn rn Cn (Ni V Q a. I o Z O 0 4 a U r- D O N @ Ll p) — r0 2 c a> Y m U) > �) L. J CO M ,4 0)• a) 7 o 0 CCS 06 O) a) '- 2 a) O E o 2 v H 2 W ai C co L r. W a) a) 2 CC C a) o la N • c y w+ U a) "d V •C0) d c C L G O " 2 W a) t U a• w CL T R O r m a J r 2 Z N W m C Z J _ N o o a) -C L) W p O Z a O a G1 ) a) 0 o m _ ....NC 0) y Cr)O) N N CO (1) Ca _ E a O O O O iii m ) a_ ca o O _°c °c d Y U H Y W v Lo co W co m ,- d Q CO Q CO CO N CO CO O) O I■ ,- CO CO LO O O M N N O V V CO V W ,- m CO N V CO . co Cn O t� r Ni CO M O CO CO CD O) 0 co co O V 1I O CO N O ,- N CO O N Ill ..-.• V V' In CO In CO N CO CO C_ 0 O O U c0 — — O co CO N N V O u) O) N- T A O r N O .- V CC) LO LO CO .- CL, N M • � ,- C•) CO N CO LC) O CO O C) CO O a J N N CO N- CO CO CO V CO N Z M M M M M M M M M M M M M M + CL CO Y CO N- CO CO CO In O CO CO O CO co O N N CO O M CO O O V t- O CO Cfl Q _c r--: N M CO V CO LI) 4 Cf) V C•) co Ni V V J O._ N- CO O) N CO M CO CO LI) r CO CO Q) 0) Q t a) N- C` N- CO CO CO CO CO CO CO CO CO 00 CO co- co Q ; a CO cO co co CO co N CO co CO co cO c0 O T .O C N E m N a M O 0 0 0 0 0 0 0 0 0 0 0 0 h- O O O O O O O O O O O O O < 0 U) Cf) LI) t L _ l() N- Ln In In In In In In In l() <N Lri In O c c 7 a CO t-- O) N- N C` N- N- N N N N O O 2 m C6 C6 N O 3-' CO CO CO V LO it) CO N- V Co f� c0 O 4 Z a a- a s C y 0 O O O O O O O (Ni N CL co fiiilL T 6 C V 0 E a 0 o�a O O y O .. N N a U ain3O a L U rn N 1 o Vilna: • .„ ,71 8 I `Wb = s PIO ig 0 —111111 ..691.1211. cr, o o ss '�liaSe - r N es Hill WI - g �� ■ 1111/ - m - o k • m� �■� . en in ca ili Li W m ■■ ] ■■■ o ° 3m o • yy� yy 3 I co u3 V 1P o S a g.. a m a c 0 id ��yy�� yg fill: F D. o o �V gb WA- z L" e, •G I ° ° T6 en W7 Y W CO '. 1 F W,LO m m c co F F F F q t/l x O N ts F Ore g a ER gl om Oro m,,,0 LOm co O.e v 0 y3 8 8<O Eg 8 E oo 000 CO 0. N CO CO N O' NN N 8 00 sN m m O m O S O S S O O N O O N O' J P E ig F cei N N N N N N N° N N Cl LN_NYj O r C -- o eel A 6a-aa Z 3��'i"Ni�o'oNaor�'ma6 r' a mm SO"'v pO ' L� R of N0N0nn CD �0 v, 7.84 3n $gym r CV 'a r ° 3a J b °?mI2mgmo'r'�r'om,m.°-'S' /' `y�e 8 d _ 'zo�� �o�°n��om Ci w �' `f4ppvvvv?V vvvVgvV • 6- y m °O N N t7 CA R ODD tp 8 W m m m S Ose m a 0 O C m m F+ `y'co op m 0o m 0o m co co m m mm ", .d b 'a' oQ 44 ER a mm nrrg Q A rqe ce me e Q 0 o N N N m eyu. — 3 i g'W `m`FyN �NCO^CDm c.COm ci co N� / // / e d _CD G N up F m O S 03 CO CO cc, CO FAO'/ v ILL -`} .v,2, u mo.om v'o r� enm i_ s-rcN ov m v m Fs y up ui vm000 NCVmmOOm"'umi r N 1 / R SD3,� ,N OO OO OO OO OO O° a // w� 000�000'�v`N°^NNN_ g o = m.. q CA o C. r°114 o� o m m m m o0 2G o°0 00`0 Sea N n o•-N Mean Sea Level lipoor N s m m CO (1.103 SZ)IndaQ izoiy►aA mul, • • co MI 1 Ili 0 0 0 M�� � 00 0 C N $Q= W ■�PIPPw- 1 'Fr U N o ��0T E -O t -4,,,..i X111 v L� O 2gJ3 u1i O, o '4 �I 1 Ilh ,a a - .F v ar N --1 1 g '6 < Q m .� a pO i a iii :°_i 0 i w m o o �~ o o .r c„ d *II ....1 .....1111101*- lift. ..N._ a 1 , . . ...: 51 'Ili 44 t9- IS) 1.C::)'4' o a .: 4 4 -41111141114 11111E iiii .. \ \ N 9G.-G 5 ``e- IMMIMIER •••� a0e—� - N @y ` •OO ��, O // 1 en 1 O.. \ - \ z ~ i \\ �O 4 %___ - a o ��f��fll R F 8 _ P. - - $ 8, ` R /2 8 or _ P. 4 b ,t 8 § _0 8 .c� r`"?' .- v 0 v v (u i/8 OL)(+)quoN/(-)Iinos 0 41 N N J O Milli BPPASSPORT 0 INUCIR MOM Travelling Cylinder Report by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-11 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 14 MD Reference: 42.90GL+28.5KB @ 71.40ft(42.90GL+28.5KB) Site Error: 0.00ft North Reference: True Reference Well: 14-11 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 5,14-11AL1 Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Reference Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,365.73 to 12,100.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,407.15ft Error Surface: Elliptical Conic Survey Tool Program Date 7/12/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.40 7,100.40 1 :Camera based gyro multisho(14-11) CB-GYRO-MS Camera based gyro multishot 7,109.00 10,365.73 14-11APB1 IIFR(14-11APB1) MWD+IFR+MS MWD+IFR+Multi Station 10,365.73 12,100.00 Plan 5(Plan 5, 14-11AL1) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 10,335.37 8,760.00 7" 7.000 8.500 12,100.00 8,894.63 2-7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 14 14-06-14-06-14-06 Out of range 14-06-14-06A-14-06A Out of range 14-06-14-06A-Plan#6 Out of range 14-10-14-10-14-10 11,400.00 10,275.00 868.94 393.76 490.21 Pass-Major Risk 14-11 -14-11A-14-11A 10,375.00 10,375.00 0.00 0.66 -0.61 FAIL-Major Risk 14-11 -14-11APB1 -14-11APB1 10,375.00 10,375.00 0.00 0.49 -0.43 FAIL-Major Risk 14-11_DIMS-14-11 -14-11 Out of range 14-11_DIMS-14-11A-14-11A Out of range 14-11_DIMS-14-11APB1 -14-11A PB1 Out of range 14-18_DIMS-14-18-14-18 Out of range 14-18_DIMS-14-18A-14-18A Out of range 14-18_DIMS-14-18B-14-188 Out of range 14-39-14-39-14-39 10,661.05 9,450.00 272.46 229.32 44.76 Pass-Major Risk 14-40-14-40-14-40 11,239.07 9,350.00 775.12 146.86 648.21 Pass-Major Risk 14-40-14-40A-14-40A 11,239.07 9,350.00 775.12 146.86 648.22 Pass-Major Risk 14-40-14-40A-Plan#1 11,239.07 9,350.00 775.12 146.86 648.22 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/12/2010 2:49:21PM Page 2 of 16 COMPASS 2003.16 Build 71 14-1 1 AL 1 follow up for PTD Page 1 of 1 Schwartz, Guy L (DOA) From: Hoffman, Wilmer[hoffmawj@bp.com] Sent: Monday, July 26, 2010 11:11 AM To: Schwartz, Guy L (DOA) Subject: 14-11AL1 follow up for PTD Attachments: 14-11AL1 PTD Application --sent to AOGCC.doc Guy, as we discussed over the phone here is some clarification on 14-11AL1 pre and post work. Pre-work: I forgot to add a line for service coil to go out and perform a dummy whipstock drift and mill out the XN nipple at 10,131' MD. Please see the atttached word document to see the change. Post-work: The completion strategy on this one is a bit different compared to our normal completions. The plan is to bring cement top to just outside the window. This will be done on calculations only based on drilling conditions(i.e. losses, size/condition of hole drilled). There is the potential of running a CBL with the CNL logging package to confirm top of cement. There is a contingency for running a slotted liner completion which would eliminate the cement job altogether and still allow for production from both laterals. The other interesting note that we discussed is the possiblity of perforating the existing CTD liner for additional area open to flow if it is found that the original lateral (14-11A) is not sufficiently contributing to production. To confirm what we discussed in writing about the 4-1/2" mono-bore whipstock, it is flow-through and will not be squeezed off with cement therefore allowing the original well (14-11A)to produce. «14-11AL1 PTD Application —sent to AOGCC.doc» Regards, Operations Drilling Engineer Coiled Tubing Drilling BP (Exploration)Alaska, Inc. Direct 907.564.4592 Cell 907.250.2601 7/26/2010 Alaska Department of NaturalP 'sources Land Administration System Page 1 of/ Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28312 Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes Q No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28312 wia?_ Search for Status Plat Updates As of 07/19/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 014E Section: 03 Section Acres: 640 Search Plats Meridian: U Township: O10N Range: 014E Section: 04 Section Acres: 640 Meridian: U Township: O10N Range: 014E Section: 09 Section Acres: 640 Meridian: U Township: 01 ON Range: 014E Section: 10 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-133 T1ON, R14E, UM 3, 4, 9, 10 2560.00 End of Case Summary Last updated on 07/19/2010. http://dnr.alaska.gov/prof ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2831... 7/19/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME Pei/ I4//J4Lf PTD# 0?/0 O yfl ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: P.e4/44,40 ZA/ POOL: ',e1/4 yOE' L / ©/G Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well Red /41-/Z4 (If last two digits in Permit No.4,1(j4?,6, ,API No. 50- 0-.4.20.57029 -O/. API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 H TO U) 0) 0 o n O !n a) ° o (0 L - 7 N C Q C 0 a) 0 • L w U) ° O 1° c E E O a n O o co a a ao C_ L 0 3 m 3 (n Lr) o Q = rn O Y o a CO O 0 p_ U) • "70 _ - C L ° < O > N Q a) o23 0. > V N o 6) N 3 O • n E Q o z a 0 n o 3 H L - 7 C 0. o (Q, C T, C N O N M a o a O O 0 v O a) D. > 0 Q au) 4 mo � zm .n a o 0 CO 'T ° .N a) 0 -0 o n 0 (n 0) w Q .� (� «N. n o m CO CO c o a . E0▪- c ,_ 0- 04. 0) N N N CD= 0) V a) .0 - p 0 0 = N r ° o ° c C a N > = CO II ° a) a) 6) - L_ N a) a) iE C al CL N C 6) 6) .N n 7 3 L T a) Q - O C) O a0 a a c C U c 0 a 2O a) n o c0 _ co N o N N CO N C -O O- a N a) 'C (O V I @ CD m O 0 0 O a) 0) Q O > a E N a Tu z U a) o , C C 7 L a) Y 7 0 0 7 O Q Cr O E L O a 0 c N a CO as a) • z m U 0) co a` U - ii 2 a` 2 < _ 2 w 0 w a b < CO CO aa)) aa)) aa)) aa)) aa)) aa)) aN) aN) a) aa)) < < < < < < < < aa)) aa)) aa)) < aN) < aN) a)) aa)) a) a.) a)aa)) < o < < < < a z >- >- >- >- >- >- r } >- >- >- >- z z z z z z z z >- >- >- z >- z r } r >- r >- z z z z z z T o a) N a CO- N4 N ° CO U o TO a) 0 E E 3 - E a) o o U c a) o Xk u! Apr O O _ \ LL T ,` 7 T n a c L o con 3k o o m c U o a) a) E _ 3 0 coo ON co N U T 0 C C O = o 'L _c CO 0 E aa)) as o U N N Q 0) E V) O v V O ' 0 N �-ca O n 0 U_ )Q C a = 7 O v J CO Q C O)C '0 N V)T j 6) co.CC . w E m a o 0 06 0 m o n) w `° w m e- a c o a) = 7 t c E u, n T a`> E o a) N.c. Q U N 7 a) (O @ T w N ° '70 O 0 023 E aa) (O 'a O co •0 O c (7/) CO N ` 0 m - L 6) ` Z N co 7 3 0 (n C 6) L C N 7 0' In 7 < u) N a) w - 45 0 C a o a) 'c a ca a) a n o ` a) m o 0 0) a) a L C c a) C _ o n as '-> 0 > a 4 - 0 N o a) Q E E = a C C E N N O (`) O C N H ..-� C O a2$ C. N ,L,,, Q N L n C 0 0 0 0 a cn 3 0 0 c o a) v N > - _ ° co U a U (O N n 1O 0 Q o 6) 7 0 'n Q Q O Qj a 3 `O > as 4 Y I 'y D Q L o0 a) a) 'C C >� O 7 7 �O a CO f. Y (6 O `p a) @ O E @ (O f0 Q (O V) 'O O 6) O a) c N• 0 0 m a o 0 o c d — Z o E 3 02" a) L 73° m E a Q a) _ n c c _ m w _c _0 _a c v) a@ E a 0 a.) 0 .- a) 6) 0- (n Q n 3 0 0 3 c E 0 C a 0 «as as O_ O_ 2 -0 a) -0 E m E C N M (n L O O O C T T> z a) w n m 3 a) ai a) .. o :° w .� m 3 co N o a a) c.) n '_ 0 m o 3 a) o a) o w U o O o a c ° :0 > o aa) _a a a o (a o c o a0i o o °c o o N °0 a) m E 0 6) c a Q N 3 a) a -0 (co 0 m 0 O a) 0 0 8 Y a) o E o E L o a) (n c H O n o -0 a) a`) a) a) 7 7 a E 0 0 0• 2 a) a) - -0 o a) a m E 0) o _ 7 c o 0 od Q L N (O p Cl 6) N '� a N N Q L V) 0) 0- N f6 (O W 6) (O o N 0) > .0 0 3 = a N 0 N o n '� N (EO C a) 3 (6 a) C .0 co C 6) 7 7 N Y N _0 .- 0 N N a C a •v) j. O (6 .0 - a a a o .N C (NO � � -0 '30. L N °) N •.N a) a)aa)) > rn • L a) � P. L.. N ° U ° OV .0 C a E• a a) E a) :> : a) a o L c c 0 c (a00 o 'N _ 3 a o c o 0 (a C a) C o m X w 7 OS O7 @ a) a) E Ca 3 7 N 0 0 CO' as - a) a) = a) 5 a N N = C o as N as U C I" w c 0 c) 0 C _ o o .O. w - 0 u) "0 c 0 a) o o - a a3 -o 0 r ui o. E '3 a) E .U.. `) U -0 C) a a) 7 O O O .0 .> (` (` Q O N a 0 7 U > > 3 7 7 Q) W W N N L °- E N a) N 0° .0-C a) a) m 7 -00 a a m a`) m a) 3 2 o o = I- 2 2 m -D m -0 a = O O C 0 w a0) a`> m 5 a) o TO-. C� c a te ° cn . 0 0 a a U Q a z o (n 0 0 0 0 Q < , o m m 0 2 a ° 0) 0) o ° W a) nI Q O N M V in a) (- W m O N M V (N (O (N (N 0) o N M V (() O r CO 0) , N CO V (!') co n o0 6) �- �- N N N N N N N N N N M M M M M M M M M M U o Q Q I.. m o a> o N 0 C N N N U 0 ge v 0 CO 0) CO co CO o) 6)'(n 6) r c N O N W c) A n C N E ,— w T cn C7 E CD C1 O C O W ala a Q w aO t7 aQ 0 70 Well History File APPENDX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history the. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 10/11/29 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 10/08/24 3335833 01 3" CTK *** LIS COMMENT RECORD *** Remark File Version 1.000 � � IIIII1111111IIIII Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 10177.7500: Starting Depth STOP.FT 11818.0000: Ending Depth STEP.FT 0. 5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 14-11AL1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 14' 16.141"N 148 deg 35' 20.665"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 24 Aug 2010 API . API NUMBER: 500292052960 Parameter Information Block #MNEM.UNIT Value Description SECT. 09 Section TOWN.N T1ON Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . DF Log Measured from FAPD.F 71.40 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 71.40 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 0Io -09q Os"(a tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic orienting Sub with a Near Bit Inclination Sensor amd an ultra Slim Resistivity Sub. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log above the Kick off Point of 10369 feet MD provided by Sperry Sun GR MWD dated 12 Sep 2005 per Jennifer Flight with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from 14-11A through a milled window in a 4 1/2 inch liner. Top of window 10369 ft.MD (8778.9 ft.TVDSS) Bottom of window 10377 ft.MD (8783.3 ft.TVDSS) (9) Tied to 14-11A at 10365 feet MD (8777.1 feet TVDSS) . (10) The interval from 11788 ft to 11818 ft MD (8890.8 ft. to 8891.1 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACLX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10184.6, 10184.8, ! 0.205078 10188.7, 10191.1, ! 2.46289 10197.7, 10200.4, ! 2.66797 10199.5, 10202.6, ! 3.07812 10208.2, 10209.4, ! 1.23145 10212.3, 10213.1, ! 0.820312 10217.8, 10218.2, ! 0.410156 10220.1, 10220.1, ! 0 10222.3, 10223.5, ! 1.23145 10231.8, 10232.8, ! 1.02637 10243.9, 10244.3, ! 0.411133 10247.8, 10248.6, ! 0.821289 10251.7, 10252.9, ! 1.23145 10258.8, 10258.8, ! 0 10273.4, 10273.7, ! 0.205078 10283.1, 10283.5, ! 0.411133 10294.8, 10295.2, ! 0.410156 10300.4, 10300.8, ! 0.411133 10305.6, 10306.6, ! 1.02637 10314.2, 10315.2, ! 1.02637 10329.4, 10329.8, ! 0.410156 10334.4, 10335, ! 0.616211 10336.6, 10337.4, ! 0.821289 Page 2 tapescan.txt 10341.8, 10343.4, ! 1.6416 10347.1, 10347.7, ! 0.616211 10358.8, 10359, ! 0.205078 10365.8, 10367, ! 1.23145 10368.8, 10369.9, ! 1.02539 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 103 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** 11111111111 , 1111111 Remark File Version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) above the Kick off Point of 10369 ft. MD log provided by Sperry Sun GR MWD dated 12 Sep 2005 per Jennifer Flight with BP Exploration (Ala * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0. 500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 Page 3 tapescan.txt 24 Total Data Records: 92 Tape File Start Depth = 10178.000000 Tape File End Depth = 11819.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 105 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** IIIII ! MMIIIIIIIMMII Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 Page 4 tapescan.txt 24 Total Data Records: 183 Tape File Start Depth = 10177.750000 Tape File End Depth = 11818.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 196 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 10/08/24 3335833 01 **** REEL TRAILER **** MWD 10/11/29 BHI 01 Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10178.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10178.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Page 5 tapescan.txt 11819.0000 -999.2500 96.1230 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10178.000000 Tape File End Depth = 11819.000000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10177.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10178.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11818.0000 -999.2500 95.6000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10177.750000 Tape File End Depth = 11818.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 6