Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-162
- STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION DEC 18 2014 WELL COMPLETION OR RECOMPLETION REPORT AND LOcCC 1a. Well Status: ❑Oil ❑Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended lb. Well Class • 20AAC 25.105 2OAAC 25.110 0 Exploratory ❑Stratigraphic 0 GINJ ❑WINJ 0 WAG 0 WDSPL ❑Other No. of Completions Zero - ® Development 0 Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/2/2014 • 210-162 • 314-563 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 1/5/2011 50-029-21649-02-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: • • 1/7/2011 PBU F-28B 2359' FSL, 2193' FEL, Sec. 02,T11N, R13E, UM 8. KB(ft above MSL): 66.71' 15. Field/Pool(s) Top of Productive Horizon: 2896' FSL, 1293' FEL, Sec. 02,T11N, R13E, UM GL(ft above MSL): 36.46' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) Oil Pool 3741' FSL, 1547' FEL, Sec. 02,T11N, R13E, UM _ 9120' 8938' ' 4b. Location of Well(State Base Plane Coordinates,NAD. 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 652650 ' y- 5973893 ' Zone- ASP4 11130' • 9055' • ADL 028280 ' TPI: x- 653538 y- 5974448 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 653266 y- 5975288 Zone- ASP4 None 18. Directional Surve y: ❑Yes Z No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: _ MWD DIR, GR 9660' • 9058' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 32' 112' 32' , 112' 8 cu yds Concrete 13-3/8" 68# L-80 31' 2675' 31' 2675' 17-1/2" 3274 cu ft AS III,465 cu ft AS II 9-5/8" 47# L-80 28' 8593' 28' 8457' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 8321' 9073' 8209' 8896' 8-1/2" 374 cu ft Class'G' 3-1/2"x 3-3/16" 8.81#/6.2# L-80 8349' 9660' 8235' 9058' 4-1/4" 146 cu ft Class'G' 2-3/8" 4.4# L-80 9590' 11130' 9055' 9055' 3" Uncemented Slotted Liner 24. Open to production or injection? 0 Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Perforation Size and Number): 4-1/2", 12.6#, L-80 8391' 8283'/8175' ( »l +'Zt6L(CLr/ 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. eit3MP ;:,P , WAS HYDRAULIC FRACTURING USED DURING COMPLETION?D Yes ® No /L;,./5 1 1.� y DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 9120' Set Whipstock SCANNED FEB 2 0 2015 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A - Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No • Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012CONTINUED O EV ubmit Original Only vri. 2/c%.--- - 2-77/5 /� SE RBE MS JAN - 9 201 ,/f 29. GEOLOGIC MARKERS(List all formations anc' kers encounter 30 FORMATION TESTS NAMEND Well Tested? Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kicked Off in(from F-28A) None Zone 1B 9296' 9042' MHO 10200' 9057' TDF-Zone 1A 10950' 9057' Formation at Total Depth: 31.List of Attachment. Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: J. Kyle Raese,564-4629 Email: John.Raese@bp.Com Printed Name: Joe Lastufk Title: Drilling Technologist Signature' .� !� Phone 564-4091 Date: V4I8/Iik INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed Item la. Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8. The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23. Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24• If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain) Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only F-28B, Well History (Pre-Rig Sidetrack) Date Summary 10/26/14 PULLED PX PRONG FROM 8,197' SLM. SET RM-DGLV IN STA#2 @ 7,758' MD. PULLED 4-1/2" PX PLUG BODY FROM SSD @ 8,209' MD. DRIFTED TO HARD TAG @ 9,092'SLM w/2.70"x 20' DUMMY WHIPSTOCK. »TARGET DEPTH of 9,200' MD NOT ACHIEVED,TAG DEPTH IS IN A 17 DEGREE DOGLEG <<. 10/26/14 T/I/0=40/0/10 SI Assist SL as directed (CTD) Pumped 30 bbls crude down IA. Standby for fluid. 10/27/14 Pumped additonal 35.5 bbls crude for total of 65.5 bbls crude down IA. Established LLR of.35 bpm @ 2350 psi. PE/Pad Op notified Tags hung on IA/WV AFE sign on wellhead ***FLUID PACKED IA***SL on well upon departure. CVs OTG FWHP=50/0/200. 10/27/14 LRS ESTABLISHES LLR OF .35 BPM @ 2350 PSI. SET WHIDDON CATCHER @ 8,349'MD. PULLED RM-DGLV STA#2 @ 7,758' MD; SET RM-DGLV(Extended Packing) IN STA#2 @ 7,758'MD. LRS UNABLE TO OBTAIN MIT-IA. PULLED RM-DGLV(Ext Pkg) ST#2 @ 7758'MD; SET RM-WATER SWELL-FIX DGLV IN STA#2 @ 7,758' MD. PULLED EMPTY WHIDDON CATCHER FROM 8,349'MD. 10/27/14 /I/O=20/vac/30 Temp=S/I. (Assist Slickline)Attempt MIT-IA 2500 psi. Pumped 55 bbls of diesel down IA until catching pressure. Pumped an additional 7.5 bbls of diesel down IA to achieve MIT-IA test pressure 2500 psi. IA lost 500 psi in 2 minutes. Bumped IA pressure back up to test pressure with 5 more bbls of diesel. IA showing same results, losing 500 psi in 2 minutes. IA,OA=otg FWHP=40/vac/30. Fluid packed annulus sign on MV. Slickline on well of departure, Pad Op notified. 10/28/14 ATTEMPTED TO SHIFT XA SSD @ 8209'MD CLOSED (shifting tools sheared). DRIFTED TO HARD TAG ©9,096'SLM w/2.70"x 10' DUMMY WHIPSTOCK. (dogleg). DRIFTED TO DEVIATION AT 9,338' SLM w/2.70"CENT, 1 3/4" SAMPLE BAILER (no recovery). 10/28/14 T/I/O=Temp. = S/I Assist Slickline(SH Weld). 10/28/14 Assist Slickline with LDL(SH Weld)Job canceled SSL on well at departure. 11/02/14 T/I/O=VacNac/0. Pre CTD T&T, Set 4"TWC#426, Install TS#01, Install Temp#73 on IA, Pull 4"TWC #426. Final WHP's VacNac/0. 11/03/14 T/I/O=SSVNac/0. Installed Tapped blind on IA Valve. Final WHP's SSVNac/0. 11/23/14 T/1/0=0/0/0. Set 4"TWC#260 at 140". See Log for details RDMO. Final T/I/O-TWC/0/0.TWC sign hung on master. Page 1 of 1 North America-ALASKA-BP Page 1 ad Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/29/2014 06:00 - 08:00 2.00 MOB P PRE PJSM AND BACK OFF WELL -BACK OFF WELL WITH WSL,NORDIC SUPERINTENDANT&NORDIC TOOL PUSHER -STAGE RIG ON PAD -PU RIG MATS/CLEAN AROUND WELL -MOVE RIG TO PAD ENTRANCE 08:00 - 13:45 5.75 MOB P PRE RIG MOVE FROM DS 15 TO F PAD -MOVE DOWN ACCESS ROAD TO OXBOW -RIGHT ON OXBOW TO SPINE ROAD -SPINE ROAD TO F PAD ACCESS ROAD -REPAIR KINGPIN ON SATELLITE OFFICE (PRICE PAD) 13:45 - 14:00 0.25 MOB P PRE NOTIFICATION GIVEN TO AOGCC FOR BOPE TEST -TIME REQUEST SUBMITTED:13:45 HRS 11/29/2014 -REQUESTED TIME OF INSPECTION:14:00 HRS 11/30/2014 -REQUEST SUBMITTED BY JESSIE WALKER 14:00 - 16:00 2.00 MOB P PRE RIG MOVE FROM DS 15 TO F PAD -SPINE ROAD TO F PAD ACCESS ROAD -F PAD ACCESS ROAD TO F PAD SPOT RIG ON BACKSIDE OF PAD ,16:00 - 17:00 1.00 MOB P PRE SET RIG MATS AROUND WELL -CONTINUE REPAIR WORK TO SATELITTE OFFICE 17:00 - 19:00 2.00 BOPSUR N RREP PRE PJSM AND REMOVE KILL LINE HARD LINE FIT AND REPLACE KILL LINE HARD LINE WITH NEW CONTINUE REPAIR SATELLITE OFFICE 19:00 - 21:00 2.00 MOB P PRE MOVE SATELLITE OFFICE FROM PRICE PAD TO F-PAD STAGE AND POSITION SATELLITE OFFICE ON PAD 21:00 - 22:00 1.00 MOB P PRE PJSM AND PULL OVER WELL -JACK UP RIG AND SQUARE UP TO WELL -PULL OVER WELL AND SET DOWN -ACCEPT RIG AT 22:00 ON 11/29/2014 22:00 - 00:00 2.00 BOPSUR P PRE PJSM AND NIPPLE DOWN TREE CAP -CYCLE TREE VALVES FOR THERMAL EXPANSION -LEAK TIGHT TEST TREE VALVES -NIPPLE DOWN TREE CAP 11/30/2014 00:00 - 00:30 0.50 BOPSUR P PRE PERFORM H2S RIG EVAC DRILL WITH AAR 00:30 - 06:00 5.50 BOPSUR P PRE PJSM AND NIPPLE UP BOPS -NIPPLE UP BOP STACK AND CENTER IN ROTARY -MU LUBRICATOR RISER FROM STACK TO FLOOR -TAKE STACK MEASUREMENTS FROM FLOOR -GREASE BOPE VALVES AS NEEDED SIMOPS: -STAGE CUTTINGS BOX,TIGER TANK,AND WELDING SHOP -RIG UP TIGER TANK HARD LINE Printed 12/15/2014 3:03:58PM North America-ALASKA-BP Page 2 pop Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 06:00 - 07:00 1.00 BOPSUR P PRE PJSMANDSHELLTESTBOPE -FILL STACK WITH WATER -PRESS TEST TO 250/3500 PSI FOR 5/5 CHARTED MIN 07:00 - 16:30 9.50 BOPSUR P PRE PJSM AND TEST BOPE STATE GIVEN NOTIFICATION OF BOPE TEST 11/29/2014 13:45 STATE INSPECTOR JOHNNIE HILL WAIVE WITNESS 11/30/2014 05:36 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#210-162,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 'CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -UPPPER 2"PIPE RAMS TESTED WITH 2" TEST JOINT BLIND RAMS TESTED ON OPEN HOLE -ANNULAR TESTED WITH BOTH 2"AND 2-3/8" TEST JOINT -TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY TOOLPUSHER AND WSL -NO FAILURES 16:30 - 17:00 0.50 BOPSUR P PRE PJSM AND PRESS TEST INNER REEL VALVE, PACKOFFS,AND INJECTOR LUBRICATOR -GET ON WELL,CIRC DIESEL OUT COIL TO TIGER TANK -LINE UP TO REVERSE CIRCULATE -PRESS TEST TO 250/3500 PSI FOR 5/5 MIN 17:00 - 19:00 2.00 BOPSUR P PRE PERFORM SLACK MANAGEMENT -CIRCULATE TO WARM UP COIL/E-LINE -STAB ON WELL,PUMP E-LINE BACK INTO REEL -CUT 290'COIL 19:00 - 20:00 1.00 BOPSUR P PRE PJSM AND INSTALL CTC -TESTED NIGHT CAP ON WELL.SHUT IN SWAB AS PER L2RA FOR HOTWORK ON THE RIG FLOOR. -DRESS COIL END,INSTALL SLB CTC -PULL TEST TO 35K# III -PRESS TEST TO 250/3500 PSI Printed 12/15/2014 3:03:58PM North America-ALASKA-BP Page 3 ofe.9 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM I Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB t68.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:00 2.00 BOPSUR P PRE PJSM AND HEAD UP BHI -PU INJECTOR.MU STINGER AND NOZZLE. PUMP SLACK FORWARD OVER BUNGHOLE. -TEST E-LINE CONNECTIVITY,GOOD. -INSTALL BHI UQC WITH FLOATS. -RE-TEST E-LINE CONNECTIVITY,GOOD. -PRESS TEST UQC TO 250/3500 PSI,GOOD. _ TEST UQC FLOATS TO 250/3500 PSI,GOOD. 22:00 - 22:30 0.50 BOPSUR P PRE PJSM AND TORQUE TREE BOLTS 22:30 - 00:00 1.50 BOPSUR P PRE PJSM AND RU LUBRICATOR -PU LUBRICATOR AND MU ROD EXTENSIONS -GET ON WELL,FILL LUBRICATOR WITH KCL -PREE TEST TO 250/3500 PSI 12/1/2014 00:00 - 02:00 2.00 BOPSUR P PRE PJSM AND PULL TWC -BLOW DOWN STACK,FILL WITH MEOH -PULL TWC,WELL ON VAC _ -SHUT IN TREE VALVES,RD LUBRICATOR 02:00 - 03:00 1.00 BOPSUR P • PRE PJSM AND RU TO BULLHEAD KILL WELL -PU INJECTOR AND MU NOZZLE ASSEMLBY -GET ON WELL,FILL STACK WITH KCL -PRESS TEST INJECTOR LUBRICATOR 250/3500 PSI -BLOW DOWN STACK 03:00 - 04:00 1.00 BOPSUR P PRE PJSM AND BULLHEAD KILL WELL -OPEN WELL TO CLOSED CHOKE,WHP=0 PSI -BULLHEAD 5 BBLS MEOH FOLLOWED BY KCL -PUMP 250 BBLS KCL -5.0 BPM,MAX WHP=1000 PSI,MAX IA 'PRESS=27 PSI 04:00 - 04:30 0.50 BOPSUR P PRE EXTENDED FLOW CHECK,WELL ON VAC 04:30 05:30 1.00 WHIP P WEXIT COME ONLINE WITH PUMP DOWN COIL TO ESTABLISH LOSS RATE -CATCH FLUID AT 17 BBLS -STATIC LOSS RATE-60-70 BBL/HR 05:30 - 07:30 2.00 WHIP P WEXIT PJSM AND PU DUMMY WS ASSEMBLY -POP OFF WELL,STAND BACK INJECTOR I -FILL HOLE DOWN KILL LINE -PU DUMMY WS -PU 2-3/8 COILTRACK -GET ON WELL,PRESS TEST QTS 07:30 - 10:00 2.50 WHIP P WEXIT RIH WITH DUMMY DRIFT F/60'-8600'MD BPM IN/OUT:1.58/1.20 CIRC PSI:1311 -MW IN/OUT:8.38 PPG/8.36 PPG -LOSS WHILE RIH 23 BPH -BLED OA:F/780 PSI-0 PSI(10 GALS) 10:00 - 12:15 2.25 WHIP P WEXIT LOG/DRIFT F/8600'-9200'MD -LOG TIE-IN WITH(-12')DEPTH CORRECTION -DRIFT WELLBORE TO 9200'MD(WOB WHILE DRIFTING 0.25K) -PU F/9200'-8900'MD -DRY DRIFT DOWN F/8900'-9200'MD(NO ISSUES) -LOG CCL F/9200'-8100'MD 12:15 - 13:45 1.50 WHIP P WEXIT POOH F/8900'-66'MD -FLOW CHECK(NO FLOW) Printed 12/15/2014 3:03:58PM North America-ALASKA-BP Page 4 s (Y Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:45 - 14:30 0.75 WHIP P WEXIT CHANGE OUT BHA -LD DUMMY DRIFT BHA -MU WHIPSTOCK BHA -SET INJECTOR ON WELL -PRESSURE TEST QTS 250/3500(PASSED) 14:30 - 17:15 2.75 WHIP P WEXIT RIH WITH WHIPSTOCK BHA F/67-9120'MD -BPM IN/OUT:0.39/0.36 CIRC PSI:161 -MW IN/OUT:8.35 PPG/8.34 PPG -LOG TIE-IN WITH(-11')DEPTH CORRECTION 1-RIH TO 9120'MD 17:15 - 17:30 0.25 WHIP P WEXIT SET WHIPSTOCK @ 9120'MD PRESSURE UP ON WHIPSTOCK TO 3100 PSI -SET 3.5K DOWN ON WHIPSTOCK(NO MOVEMENT) -UNSTING FROM WHIPSTOCK 17:30 - 19:30 2.00 WHIP P WEXIT SWAP WELL FOR 8.36 PPG KCL TO 9.53 PPG MUD -BPM IN/OUT:1.52/1.51 -WITH 9.5 PPG MUD ALL AROUND,LOSE ,RETURNS -INITIAL LOSSES-40-50 BPH CALL AND MAKE NOTIFICATIONS TO ODE AND SUPERINTENDENT LOSSES HEAL UP TO 1.10/1.10 BPM IN/OUT OVER 30 MIN -TOTAL LOSSES 15 BBLS 19:30 - 20:30 1.00 WHIP P WEXIT CIRCULATE OUT CRUDE CUT MUD -POOH WITH WS SETTING TOOL TO 8100' MD. -SEE MUD RETURNS CUT WITH CRUDE. -MUD WT IN/OUT:9.54/9.25 PPG. -STOP AND FLOW CHECK WELL,NO FLOW. -CALL AND MAKE NOTIFICATIONS TO ODE AND SUPERINTENDENT. -AGREE TO CIRCULATE UNTIL RETURNS CLEAN UP. -CIRC 0.85 BPM IN/OUT.TAKE CRUDE CUT RETURNS OUTSIDE. TEST FOR IA/TUBING COMMUNICATION -BLEED IA FROM 570 PSI WHILE CIRC AT 0.85 BPM IN/OUT. -IMMEDIATE LOSS OF RETURNS TO 0.85/ 0.48 BPM IN/OUT. -SHUT IN IA AND REGAIN FULL RETURNS.IA BUILD TO 530 PSI. -BLEED FLUID GAS,NO FREEZE PROTECT. 20:30 - 22:00 1.50 WHIP P WEXIT POOH WITH WS SETTING TOOL -100'/MIN WITH 1.21/0.81 BPM IN/OUT FLOW CHECK AT SURFACE,NO FLOW 22:00 - 22:30 0.50 WHIP P WEXIT PJSM AND LD WS SETTING TOOL ASSEMBLY -POP OFF,STAND BACK INJECTOR -BLOW DOWN TOOL,LD 2-3/8"COILTRAK -LD WS SETTING TOOL -SHEAR NUT FUNCTIONED AS INTENDED -OFFLOAD WS SETTING TOOL Printed 12/15/2014 3:03:58PM North America-ALASKA-BP Page 5 oae Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:30 1.00 STWHIP P WEXIT PJSM AND PU MILLING ASSEMBLY -PU MILL,STRING MILL,2-1/8"XTREME MOTOR -WSLAND BTT REP GAGE MILL,2.74 GO,2.73 NO-GO -PU 2 JTS 2-1/16"CSH -PU 2-3/8"COILTRAK -GET ON WELL,PRESS TEST QTS 23:30 - 00:00 0.50 STWHIP P WEXIT RIH WITH MILLING ASSEMBLY -100'/MIN WITH 0.47/0.85 BPM IN/OUT RIH TO 3500'MD 12/2/2014 00:00 - 01:30 1.50 STWHIP P WEXIT CONTINUE RIH WITH MILLING ASSEMBLY -100'/MIN WITH 0.47/0.85 BPM IN/OUT -TIE-IN WITH-10'CORRECTION -DRY TAG WHIPSTOCK AT 9120'MD -PU AND COME ONLINE WITH 1.50 BPM IN/OUT -TAG WHIPSTOCK AT 9120.4'MD AND STALL OUT -PU AND TAG WHIPSTOCK AT 9120.1'MD �' ' 01:30 - 09:00 7.50 STWHIP P WEXIT MILL WINDOW FROM 9120'TO 9125'MD C*`a/�,-r -FS:3350 PSI MTR WRK:100-200 PSI WOB: 1.0-2.0K# BPM IN/OUT:1.52/1.52 PVT:111 BBLS -MW IN/OUT:9.55/9.45 PPG -ECD/IA/OA:10.32 PPG/382 PSI/178 PSI 09:00 - 11:30 2.50 STWHIP P WEXIT MILL NEW FORMATION F/9125'-9135'MD -BPM IN/OUT:1.51/1.51 CIRC PSI:3375 -MW IN/OUT:9.50 PPG/9.41 PPG -IA/OA/PVT:380 PSI/504 PSI/115 BBLS -ECD/ANN PSI:10.29 PPG/4709 PSI -SEE 50%CHERT/50%SAND IN SAMPLES 11:30 - 13:00 1.50 STWHIP P WEXIT DRESS AND DRIFT WINDOW REAM UP AT 1'/MIN,THEN DOWN AND UP 3X AT 1'/MIN DRY DRIFT WINDOW,WINDOW CLEAR 13:00 - 15:00 2.00 STWHIP P WEXIT POOH WITH THE MILLING ASSEMBLY -FLOW CHECK OFF BOTTOM,NO FLOW -90'/MIN WITH 1.70/1.35 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 15:00 - 15:30 0.50 STWHIP P WEXIT PJSM AND LD MILLING ASSEMLBY -POP OFF,STAND BACK INJECTOR -BLOW DOWN TOOLS,LD 2-3/8"COILTRAK -LD 2 JTS 2-1/16"CSH -LD MOTOR AND MILLS -WSLAND BTT REP GAUGE MILLS -WINDOW MILL:2.74 GO,2.73 NO GO. -STRING REAMER:2.74 GO,2.73 NO GO. 15:30 - 16:00 0.50 DRILL N SFAL PROD1 PJSM AND REPLACE LEAKING REEL SWIVEL 16:00 - 16:45 0.75 DRILL P PROD1 PJSM AND PU BUILD ASSEMBLY -PU 2-3/8"ULS MOTOR W/1.95 AKO -PU NEW HUGHES 3.25"BI-CENTER -PU 2-3/8"COILTRAK W/O RESISTIVITY GET ON WELL,PRESS TEST QTS 16:45 - 18:45 2.00 DRILL P PROD1 RIH W/BUILD BHA F/61'TO 9135'MD AT 100 FPM. -0.61/0.97 BPM IN/OUT W/1350 PSI -LOG TIE-IN W/-11'CORRECTION Printed 12/15/2014 3:03:58PM North America-ALASKA-BP Page 6 of-0' Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB©66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:45 - 22:30 3.75 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/9135' -NBI 43° -ROP 30'/HR -BPM IN/OUT:1.53/1.53 -CIRC PSI:3385 PSI -ECD:10.35 PPG(OBD) -MW IN/OUT:9.50 PPG/9.42 PPG IA/OA/PVT:287 PSI/444 PSI/266 BBLS -DHWOB:1.00K LBS-2.5K LBS -DRILL TO 9250'MD 22:30 - 00:00 1.50 DRILL N DPRB 9,250.00 PROD1 POOH TO DIAL UP MOTOR BEND -ONLY ACHIEVING 24DEG DOGLEGS,NEED 28'S -CANNOT ASSURE LANDING ABOVE 13N SHALE -NOTIFY AND CONSULT WITH TOWN GEO -DECIDE TO POOH AND DIAL UP MOTOR WIPER BACK TO WINDOW -30'/MIN WITH 1.50/1.37 BPM IN/OUT 1-PULL INTO WINDOW,OPEN EDC 1-FLOW CHECK,NO FLOW POOH WITH BUILD ASSEMBLY -100'/MIN WITH 1.90/1.50 BPM IN/OUT _ -POOH TO 4600'MD 12/3/2014 00:00 - 01:00 1.00 DRILL N DPRB 9,250.00 PROD1 CONTINUE POOH WITH BUILD ASSEMBLY F/ 4600'MD -100'/MIN WITH 1.90/1.50 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 01:00 - 01:30 0.50 DRILL N DPRB 9,250.00 PROD1 PJSM AND LD BUILD ASSEMBLY -POP OFF,STAND BACK INJECTOR -STAND BACK 2-3/8"COILTRAK -LD MOTOR AND BIT -BIT GRADE:4-1-RO-N-X-I-CT-BHA -DIAL UP MOTOR FROM 1.95 TO 2.3 AKO 01:30 - 02:30 1.00 DRILL N DPRB 9,250.00 PROD1 PJSM AND PU BUILD ASSEMBLY -PU 2-3/8"ULS MOTOR W/2.3 AKO -PU NEW HUGHES 3.25"BI-CENTER -PU 2-3/8"COILTRAK W/O RESISTIVITY -GET ON WELL,PRESS TEST QTS 02'30 - 04:30 2.00 DRILL N DPRB 9,250.00 PROD1 RIH WITH BUILD ASSEMBLY TO 8635'MD -100'/MIN WITH 0.51/0.89 BPM IN/OUT 04:30 - 06:45 2.25 DRILL P PROD1 PERFORM LONG TIE-IN WITH-10.5' CORRECTION -LOG RATAG AT9125'MD -TOW 9120'MD,BOW 9125'MD -CONTINUE RIH TO BOTTOM 06.45 - 10:30 3.75 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/9250' -NBI 43° ROP 70'/HR -BPM IN/OUT:1.48/1.49 -CIRC PSI:3315 PSI -ECD:10.35 PPG(OBD) -MW IN/OUT:9.52 PPG/9.44 PPG -IA/OA/PVT:287 PSI/403 PSI/264 BBLS -DHWOB:0.64K LBS-2.5K LBS -DRILL TO 9370'MD 10:30 - 11:30 1.00 DRILL P PROD1 POH W/3-1/4"BUILD BHA#5 F/9370'TO 9100' CIRCULATING ALL SAMPLES OUT OF HOLE 1 PUMPING 1.48 BPM W/3150 PSI. 11 30 - 13:00 I 1.50 DRILL P PROD1 CONTINUE TO POH W/9100'TO 61'AT 100 FPM PUMPING 2.0 BPM THROUGH OPEN EDC. Printed 12/15/2014 3:03:58PM = 41116"CNV WEL D2 8 WH_LFEA = Mc EVOY � SA. NOTES: WELL ANGLE>70°@ 9291'"' ACTUATOR= BAKER C OKB.ELEV= 66.7' I I BE ELEV= 38' KOP= 6700' Max Angie= 9TH, 10082' ( Q 1 2085' -14-1/2.OTIS DBE SSSV NP,0=3.813" Datum MD= 9041' Datum TVD= 8800'SS 13-3/8"CSG,68#,L-80 BTRS,D= 12.415' 2675' GAS LIFT MANDRF3_S ST MD TVD DEV TYPE VLV LATCH SIZE DATE ' /v7 'v2978 2978 V 1 OTIS DMY RM k' 0 11/15/13 �I r6 r4774 4774 r 0 0715 DMY RM " 0 11/15/13 Minimum ID = 1.995" @ 9597' r5 5904 '5903 r 1 OTIS DMY RA r 0 10/12/86 TOP OF 2-3/8" SLOTTED LINER r4 '6640'6638 r 8 OTIS DMY RA r 0 10/12/86 r3 "7180'7161-' 18 OTIS DMY RA r 0 10/12/86 2 7758 7698 24 OTIS 'DMY RM 0 10/27/14 1 8140 8045 25 OTIS EO DMY RA 0 10/12/86 'STA#2=SWELL FIX OMY l $209' 4 112"OTIS XA SLD SLV,D= 3.813" 7 8268' -1T1W TBG SEAL ASSY X 8283' H9-5/8"X 4-1/2" TM/1-11-IBP PKR,D=4.750" "-1 8288' H MLl OUT EXTENSION,ID=6.004" TOP OF 7"LNR H 8321' 8321' -17"BROWN SHORTY HY D.LNR MGR i , 8325' -14-1/2"OTIS X NP,D=3.813" • 8349' _1-0.70"BKR DEFLOY MENT SLV,D=3.00" „ 8357' -14-1/2"OTIS XN fes,MLL®TO 3.80"(BAND LNR) ■ t 8369' -13-1/2"HES X NP,ID=2.813" 4-1/2"TBG-PC, 12.6#,L-80 BUTT," H 8391' ■ .0152 bpf,ID=3.958 �/ 8391' /412"WLEG(B89NDCT LMR) H l 3-12MR "L ,8.81#,L-80 SR_,.0087 bpf,D -1 =2.992" 8401' 1--_____ / 8401' H3-1/2"X 33/16"X0,13=2.786" 9-5/8"CSG,47#,L-80 NSCGBTRS,D=8.681" H 8593' A , 8845• ESTIMATE)Ct3UJF TOP •,ir ��� NL 7" LOUt WINDOW(F-28A) 9073' ••• •O 7"LMR,26#,L-80 TC45,.0383 bpf,D=6.276" - -9073 •. 3-3/16"MLLOUT WINDOW(F-28C) 9120'-9125' 33/16"BKR PKR V1 STOCK(12/01/14) H 9120' t_ .... TOP OF 2-3/8"LNR H 9590' 3-3/16"BKR FI(R WHIPSTOCK(01/04/11) -{ 960' 9209' -V MAPoCER JOINT 9590' H 2.70"BTT DEPLOYMENT SLV,ID=2.250" 3-3/16"LMR,6.2#,L-80,.0076 bpf,D=2.80" H 967$' ( I PERFORATION SUMFM ARY ` 33/16"MLLOUf WINDOW(F-28B) 9660'-9665' REF LOG: ANGLE AT TOP FERE: WA 1 -- ` Note:Refer to Production DB for historical perf data 2.318"SLTD LNR -{ 11130' \ SIZE SPF INTERVAL Opn/Sqz SHOT SOZ S� 2-3/8" SLOT 9597-11130 SLID 01/14/11 4.40#,L-80 STL, .0039 bpf,0=1.995" DATE REV BY COMMENTS DATE REV BY C MENTS PRUDHOE BAY UNT 10/12/86 N18E ORIGINAL COMPLETION 10/26/14 LEC/PJC PULL PX RUG WELL: F-28B 05/22/04pIORDFC 1 CTD SIDETRACK(F-28A) 10/27/14 LEC/PJC GLV CIO PERMIT No:'2001620 01/16/11 NORDIC 1 CTD SIDETRACK(F-28B) 10/30/14 PJC TREE CORRECTION RR SQUID API No: 50-029-21649-02 10/02/14 TLMY PJC TBG/LNR/GLMS(#1-#4)UFDA IEU 11/13/14 PJC LINER COTTON SEC 2,T11 N,R13E,2359'FSL&2193'EEL 10/08/14 JM/!AID GLV(110(10/03/14) 12/01/14 NORDIC 1 SET VVI-E'STOCK 10/22/14 ?/PJC SFTY NOTE/COMPOSIT REMOVE BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. al Q - 1 coa Well History File Identifier Organizing(done) ❑ Two-sided III 111111111111111 ❑ Rescan Needed III 11111 II 1111111 RES N DIGITAL DATA OVERSIZED (Scannable) olor Items: ❑ Diskettes, No. ❑ Mas: Greyscale Items: Other, No/Type: C. No. I Cher Items Scannable by a Lar Large ScannerS ❑ Poor Quality Originals: OVERSIZED (Non-Scannab e ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: MariaDate: ' f /s/ nf) Project"ect Proofing1111111111111111111 BY: (Mari Date: LW S N. /s/ (ViP Scanning Preparation I x 30 = 3 0 + a3 = TOTAL PAGES L'3 (Count does not include cover sheet) vii BY: _ Maria Date: 4 ` li. /s/ Production Scanning III 11111111111 11111 Stage 1 Page Count from Scanned File: `-f' (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES NO BY: WO Date: Lt...Igil ... is, (lvi F Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III 1111111111 1I III ReScanned III 1111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked 111111111 . . . . . . . . . . . . . o f en o Co 2 o ] 0 rEcT © z \ 0 e 0 ƒo c \ ° f O / (X� 2 � 9 5 ; a) o �0 2 o $ E ) m - o& ) E §ƒ \ §j 0 0 cC / 2 0 0 § 0 0 § / 0 ' < o 0 =. I @ - 2 \ § 0 / 0 \ § § u \ R ƒ 2 § o % m * n n n z / !» % § § § § § § _ in 2E / C o = c c c c c c k k ' E } ° ° 0 0 0 0 0 0 0 0 0 ce k - co ° z k 2 0 / / el ) \ 0 / 0 SD 0 z z o 0 § \ 3 2m a� 9 CL \ \ / m = Ce Q o £ t G m 3 3 3 2 2 S ' a co co m@ m $ co m co % W X to u j ) Eli m \ \ i cn,_ `k IXI .0 k 1 / § 0 0 6 � .� CL ® \ \ 2 \ j2 . 0 0 0 ' A j / k 00 m 10 U O 2 0 Eco —i CO m 1 \ I Q 03 f I w E II"'" i- � � � i 76u) CO2 t CO a m \ / \ / o o t A a u Q a \ \ 1 o\ Q z a. Ez �� 0 » t CD E G f 6 ( a ; 2 . _ § m 2 % > � . § 1 ) c J / J J CO J ' § a . g ) al - al co co a , co k z� - . co \ ca E as B 0) C 0 0 0 = 0 0 0 0 # 2 . a e z o � � _ - E o . o - � n , \ f ƒ \ ; / < \ z k � � § \ / ■ § ce § \ w o z � i , $ \ E u. / 0 re / k t\ c.) in cn k z k m j r i6 / � \ k 1 --tc �__ �� 2 � � \ \ \ P 0 k n? E E \ > E o 0 111 a 0. 0)2 (1& 0 0 0. 0 0 0 0 g 0 ° # 5o E o ; a � � 0 w / —I c I— [f.b.±. ± w _1 _1 u « 4 0 2± 1 0 0 9 N O OI j a co N Z O 0 O O N p ! ..- z Z I „4-4 E. a ri J 1 j Z O r , 7 y U) wo' N O z CL 17- • U Ce 0 a W w J 0 0. o z < R _ LN J 0. 7 O m O. co N o 'I 5-4. Q, E U J m I- LL 1 I- F- E r '' Z o N Ca m n w /�A • N a Q a o I- w QE Ci Z ° E U z m • Loo rn 0 0o m I v oa) Na) 1 m • 1 V « si 'a E o E a c°) BAKER UES S � f alerhughes.cam West 795 East 94th Avenue Anchorage,AK 99515 Tel: 907-267-6612 Fax: 907-267-6623 May 12, 2011 Attention: Christine Mahnken State of Alaska-AOGCC 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Subject: Final Log Distribution—BP Exploration (Alaska), Inc. F-28B Prudhoe Bay Unit North Slope Borough,AK API#: 50-029-21649-02 Rig: Nordic-1 SO#: 3573574 Please find enclosed the following final deliverables for the above well: 1 Set of Color Prints (to follow) 1 Survey Report 1 Data CD We sincerely appreciate the opportunity to provide our products and services to you and look forward to working with you in the future. Should you have any questions, you can contact me at(907) 267-3420. Regards, Jim Woods Geoscience Advisor Enclosures JW/dh Feta. BAKER HUGHES www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME F-28B STATE ALASKA HELL) PKUUHOL I3AY UNI I UAI L 5/12/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO#3573574 Log Film Log Film Copies Copies Client/ Partners Copies Copies Client / Partners 2 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 1 Company DNR-DIVISION OF OIL&GAS Company Person CORAZON MANAOIS Person Address 550 WEST 7TH AVE. Address SUITE 800 ANCHORAGE,AK 99.501_ Company Company Person Person Address Address Company Company Person Person Address Address ` 21O —(&� Page 1 of 1 bp Date 05-12-2011 Transmittal Number:93192 1, BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data& Electronic Log Prints for the following wells: 15-11CPB1 ata—'(3 43 xi toc714 18-13C a io-.i !y .,QQ A-39A a:10— 11s5" i-!loch F-28B aiv—/tog /`fC0c99 S-01C a..10-1414 1411;3,4)S-18B 'Q 10—eat i qcr? r S-129 -129PB1 S-129PB2\.. 910.-3 a 71-4,30 0, r) f. °r Z:P- i'' F\',) Please ' and Return one copy of this transmittal. Thank You, Doug Dortch Petrotechnical Data Center . ;; ,-'�t� '3 n.a' e'r d Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E.Benson Blvd.PO Box 196612 Anchorage,AK 99519-6612 4 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.D to Comp.,Suva or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 01/112011 210-162 3. Address: 6.Date Spudded: 13. API Number: P.O.Box 196612,Anchorage,Alaska 99519-6612 01/05/2011 50-029-21649-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 1/7/2011 PBU F-28B 2359'FSL,2193'FEL,SEC.02,T11 N,R13E, UM 8. KB(ft above MSL): 66.70, 15.Field/Pool(s): Top of Productive Horizon: 2896'FSL, 1293'FEL, SEC.02,T11 N,R13E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 3741'FSL, 1546'FEL, SEC.02,T11 N,R13E, UM 11130' 9055' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 652650 y- 5973893 Zone- ASP4 11130' 9055' ADL 028280 TPI: x- 653538 y- 5974448 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 653266 y- 5975288 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR 9661' 9058' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu vds Concrete 13-3/8" 72# L-80 Surface 2675' Surface 2675' 17-1/2" 3274 cu ft AS III.465 cu ft AS II 9-5/8" 47# L-80 Surface 8593' Surface 8457' 12-1/4" 575 cu ft Class'G' _ 7" 26# L-80 8321' 9075' 8209' 8898' 8-1/2" 374 cu ft Class'G' 3-112"x 3-3/16" 9.2#/6.2# L-80 8349' 9661' 8235' 9058' 4-1/4" 146 cu ft Class'G' 2-3/8" 4.44# L-80 9590' 11130' 9055' 9955' 3" Uncemented Slotted Liner 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 2-3/8"Slotted Section ✓ 4-1/2", 12.6#,L-80 _ 8390' 8283'/8175' MD TVD MD ND 9597'-11130' 9055'-9055' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/McOH 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): February 21,2011 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 2/22/2011 8 Test Period 4 667 4,341 1 128 6,509 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 425 1,620 24-Hour Rate 4 2,001 13,022 3 Not Available 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®Ne If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descripti fu photographs a 1 per 20 AAC 250.071. None 111a2Sit12U19 RBDMS MAR 0 2 1 s.....%11.4, MAR O 1 Alaska Oil&Pse Cons.Commission Form 10-407 Revised 12/2009 CO INUED ON REVERSE / iirnit riginal Only 29.'GEOLOGIC MARKERS(List all formations and mail ers encountered): 30. .JRMATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kicked Off in(from F-28A) 9296' None Zone 1B MHO 10200' 9057' TDF/Zone 1A 10950' 9057' Formation at Total Depth(Name): TDF/Zone 1A 10950' 9057' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoin is true and correct to the best of my knowledge. 03/0i/ Signed: Terris Hubble _ Title: Drilling Technologist Date: G PBU F-28B 210-162 Prepared By Name/Number. Terre Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Amanda Rebol, 564-5543 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America -ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name: F-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/1/2011 00:00 - 02:30 2.50 MOB P PRE RIG RELEASED FROM F-27B AT MIDNIGHT. PREP RIG TO MOVE OFF OF F-27B 02:30 - 04:00 1.50 MOB P PRE PJSM ON RIG MOVE. PULL OFF OF WELL AND STAGE AT EDGE OF PAD FOR PAD PREP 04:00 - 16:00 12.00 MOB P PRE CONDUCT MAINTENANCE WHILE PAD IS PREPPED 16:00 - 18:45 2.75 MOB P PRE WHILE PREPARING TO MOVE RIG OVER WELL,CHECK WAS MADE ON WELL PRESSURE. GAUGE SHOWED 2000 PSI. WSL CONTACTED TO VERIFY PRESSURES. WSL HAD CREW BLEED DOWN;BLEED TO ZERO TOOK 5 MINUTES WITH LIQUID FOLLOWED BY ASSUMED GAS. PRESSURE BUILT UP OVER 5 MINUTE SPAN. WSL HAD CREW MAKE UP MANIFOLD TO ALLOW BLEED LINE AND GAUGE TO BE MADE UP TO BLEED VALVE. BLED DOWN ONCE AGAIN MONITORING PRESSURE OVER TIME. BLEED OFF TO 0 PSI TOOK 5 MINUTES AGAIN. CREW CHANGED OUT,DAY WSL BRIEFED NIGHT WSL ON STATUS. CALL OUT VALVE CREW TO MOBILIZE TO OPEN SSV WITH POSSIBILITY OF RE-CONFIRMING PRESSURE TEST AGAINST TWC. 18:45 - 20:00 1.25 MOB P PRE CONDUCT PJSM ON STATUS OF TREE PRESSURE. PJSM ADDRESSED WHAT TOOK PLACE PRIOR TO OUR CREWS ARRIVAL,THE POTENTIAL HAZARDS,AND THE POTENTIAL AREAS THAT COULD BE CAUSING THE PRESSURE. IT ALSO ADDRESSED THE CONCERNS WITH THE PINHOLE LEAK FROM THE STARTING HEAD AND HOW OUR CREWS WILL MONITOR IT. CREW BROKE FROM PJSM AND WENT TO TREE. 0 PSI WITH NO BLEED OFF ON OA GAUGE AND ON TREE CAP GAUGE WITH MASTER AND SWAB VALVE OPENED. MONITOR GAUGES WHILE WAITING ON VALVE CREW. 20:00 - 21:00 1.00 MOB P PRE PJSM ON RIGGING UP AND OPENING SSV. DISCUSS DETAILS OF WHAT PRESSURE WAS SEEN. CLOSE SWAB AND MASTER, INSTALL BURST DISK INTO SSV. RIG UP AND OPEN SSV. OPEN MASTER,SWAB VALVES. 0 PSI ON GAUGES. CONSULT WITH FIELD SUPERINTENDENT, DISCUSS PRESSURES. MOST LIKELY THERMAL EXPANSION FROM FLUID PACK PREVIOUS NIGHT(-35 TO-40 DEG,HEATER ON TREE FOR 36 HOURS). DECIDE TO RD VALVE CREW AND MOVE RIG ON WELL. 21:00 - 22:30 1.50 MOB P PRE PJSM ON RIG MOVE. MOVE RIG OVER F-28B. 22:30 - 00:00 1.50 MOB P PRE PREPARE RIG FOR OPERATIONS. CELLAR BUTTONED UP. ADAPTER FLANGE MOBILIZED. BOP READY FOR NU. RIG ACCEPT AT MIDNIGHT. 1/2/2011 16:45 - 21:00 4.25 MOB P WEXIT PJSM ON COIL MANAGEMENT. PULL COIL TUBING ACROSS AND STAB. MU REEL LINES FOR CIRCULATING. Printed 1/17/2011 10:57:55AM • North America-ALASKA- BP Page 2 of 7 4 Operation Summary Report Common Well Name:F-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 21:30 0.50 RIGU P WEXIT CONDUCT PRE-SPUD WITH NIGHT CREW 23:30 - 00:00 0.50 RIGU P WEXIT REVERSE CIRCULATE E-LINE FOR PRESSURE BULKHEAD MU 00:00 - 04:00 4.00 BOPSUR P PRE NU TREE ADAPTER FLANGE. NU BOP. • DOUBLE CHECK TORQUE ON TREE NUTS • AFTER NU,ALL GOOD. 04:00 - 14:30 10.50 BOPSUR P PRE TEST BOP TO 250 LOW,3500 PSI HIGH WITH 2 3/8"TEST JOINT. AOGCC REP BOB NOBLE WAIVED WITNESS OF TEST(PHASE 2,LEVEL 2 CONDITIONS). TEST WITNESSED BY WSL ROB O'NEAL AND TOURPUSHER TOM KILFOYLE. AFTER CHANGEOUT,TEST WITNESSED BY WSL ROB MIELKE AND TOOLPUSHER JAY MURPHY. 14:30 - 15:30 1.00 BOPSUR P PRE TEST TREE AGAINST TWC TO 3500 PSI. TEST AGAINST MASTER VALVE AND SWAB VALVE. GOOD TESTS. 15:30 - 16:45 1.25 MOB P WEXIT CONDUCT PRE-SPUD WITH DAY CREW 21:30 - 23:30 2.00 RIGU P WEXIT CLEAN RIG, PREP FOR OPERATIONS WHILE WAITING ON METHANOL TO ARRIVE ON LOCATION(WEATHER) 1/3/2011 00:00 - 04:00 4.00 RIGU P WEXIT REVERSE CIRCULATE E-LINE FOR PRESSURE BULKHEAD MU. BREAK CONNECTION AT REEL. NO E-LINE. RECONNECT. ATTEMPT AGAIN. NO GO. RECONNECT AND RE-ATTEMPT. FIFTH TIME A GO. TAKE ON KCL INTO PITS WHILE CONDUCTING SLACK MANAGEMENT. 04:00 - 13:30 9.50 RIGU P WEXIT MU PRESSURE BULKHEAD. CONDUCT SLACK MANAGEMENT. CUT COIL. MU AND TEST BHI CONNECTOR. 17:00 - 18:45 1.75 RIGD P WEXIT RD LUBRICATOR 13:30 - 15:30 2.00 RIGU P WEXIT PJSM ON RU OF LUBRICATOR AND PULLING TWC. RU DSM LUBRICATOR. 15:30 - 17:00 1.50 RIGU P WEXIT PRESSURE TEST LUBRICATOR. PULL TWC. BLEED OFF LUBRICATOR. 18:45 - 19:00 0.25 KILLW P WEXIT PJSM ON BULLHEAD OPERATIONS. Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 3 of 7 Operation Summary,Report Common Well Name:F-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292164900 Active Datum:29: 28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 20:30 1.50 KILLW P WEXIT "WHP=0 PSI. IAP=0 PSI(CONFIRMED W/ MANUAL GAUGE IN CELLAR). OAP=0 PSI (CONFIRMED W/MANUAL GAUGE IN CELLAR). PUMP 10 BBLS NEAT METH SPEAR DOWN WELLBORE,BULLHEADING W/NO RETURNS. SWAP TO KCL. ONLINE W/2%KCL BULLHEADING DOWN BACKSIDE W/NO RETURNS. INITIAL RATE IS -4.3 BPM AT 0 PSI WHP. POSITIVE WHP AT 16 BBLS AWAY;PUMP AT 4.3 BPM 10 BBLS AWAY:4.3 BPM AT 3600 PSI. 30 BBLS AWAY:4.3 BPM AT 3700 PSI. 50 BBLS AWAY:4.3 BPM AT 3720 PSI. 70 BBLS AWAY:4.3 BPM AT 3750 PSI. 90 BBLS AWAY: 4.3 BPM AT 3780 PSI. 110 BBLS AWAY: 4.3 BPM AT 3810 PSI. 130 BBLS AWAY: 4.3 BPM AT 4000 PSI. 135 BBLS AWAY:4.3 BPM AT 3800 PSI. 145 BBLS AWAY:4.3 BPM AT 3610 PSI. 150 BBLS AWAY: 4.3 BPM AT 3700 PSI. 170 BBLS AWAY: 4.3 BPM AT 3720 PSI. 175 BBLS AWAY:4.3 BPM AT 3770 PSI. 190 BBLS AWAY:4.3 BPM AT 3830 PSI. 195 BBLS AWAY:4.3 BPM AT 3810 PSI. 210 BBLS AWAY: 4.3 BPM AT 3810 PSI. 230 BBLS AWAY: 4.3 BPM AT 3710 PSI. 250 BBLS AWAY: 4.3 BPM AT 3700 PSI. 260 BBLS AWAY:4.3 BPM AT 3700 PSI. 280 BBLS AWAY:4.3 BPM AT 3690 PSI. 300 BBLS AWAY:4.3 BPM AT 3700 PSI. 305 BBLS AWAY:4.3 BPM AT 3700 PSI" 20:30 - 22:15 1.75 KILLW P WEXIT SHUT DOWN PUMPS. FLOW CHECK. RETURNS STARTED AT 1.4 BPM BUT QUICKLY REDUCED TO.8 BPM,1084 PSI. RETURNS GRADUALLY DROPPED TO.22 BPM AND LEVELED OUT THERE. CHECK SURFACE EQUIPMENT,FIND VALVE ISOLATING PUMP 1 FROM PUMP 2 IS BLEEDING BY. ISOLATE KILL LINE FROM PUMPS AND OUT FLOW NOW AT 0 BPM. PUMP ACROSS TOP TO FILL. CONDUCT ANOTHER FLOW CHECK AND CALCULATE 6 BPH LOSSES. 22:15 - 00:00 1.75 STWHIP P WEXIT CONDUCT PRE-SPUD WITH NEW CREW. PJSM ON MU,RUNNING WHIPSTOCK. MU 3 3/16"BAKER PACKER WHIPSTOCK WITH BAKER HYDRAULIC SETTING TOOL BHA. MU INJECTOR,CONDUCT MEG CONTINUITY TEST. FILL WELL THROUGH COIL. RIH. 1/4/2011 00:00 - 02:00 2.00 STWHIP P WEXIT RIH WITH 3 3/16"BAKER PACKER WHIPSTOCK WITH BAKER HYDRAULIC SETTING TOOL TO 9050'. LOSSES CALCULATED AT APPROXIMATELY 8 BPH WHILE RIH. 02:00 - 02:30 0.50 STWHIP P WEXIT CONDUCT TIE-IN PASS AT 9080'. -10' CORRECTION. Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name:F-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292164900 Active Datum:29: 28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 03:30 1.00 STWHIP P WEXIT CONTINUE TO RIH. ORIENTWHIPSTOCK ASSEMBLY TO 70 DEG LOHS BEFORE ENTERING 3 3/16"LINER. RIH AND CONDUCT CCL LOG FROM 9600'TO 9400'. CORRELATE CCL TO MCNL LOG. NO COLLARS IN PROPOSED WHIPSTOCK SETTING DEPTH. 03:30 - 03:45 0.25 STWHIP P WEXIT CONTINUE PICKING UP TO CONDUCT TIE-IN AT 9080'. +1/2'CORRECTION. 03:45 - 04:15 0.50 STWHIP P WEXIT RIH TO 9669.25'. PU TO NEUTRAL WEIGHT. CLOSE EDC. INCREASE PUMPS. POSITIVE INDICATION OF SHEAR AT 3250 PSI. SLACK OFF WITH 5K TO CONFIRM SET. WHIPSTOCK ON SETTING DEPTH OF 70 DEG LOHS AT 9669'. TOP OF WHIPSTOCK AT 9660'. 04:15 - 05:15 1.00 STWHIP P WEXIT PUH TO 9630'. CONDUCT PRESSURE TEST OF PACKER TO 250 PSI LOW AND 2400 PSI HIGH ON CHART. 05:15 - 08:00 2.75 STWHIP P WEXIT DISPLACE KCL TO 8.6 PPG GEO-VIS MUD SYSTEM. 08:00 - 10:00 2.00 STWHIP P WEXIT POOH W/WHIPSTOCK RUNNING TOOL 10:00 - 11:00 1.00 STWHIP P WEXIT LD WS SETTING BHA AND MU WINDOW MILLING BHA 11:00 - 13:00 2.00 STWHIP P WEXIT RIH W/WINDOW MILLING BHA. 13:00 - 13:30 0.50 STWHIP P WEXIT LOG TIE-IN. CORRECT-8' 13:30 - 21:00 7.50 STWHIP P WEXIT MILL WINDOW FROM 9660.2' BOTTOM OF WINDOW NOTED AT 9665.4' MILL ADDITIONAL 10'OF RAT-HOLE. REAM WINDOWAREA 3 TIMES AND DRY DRIFT WITHOUT ANY SET DOWNS FORMATION SAND NOTED IN BOTTOMS UP SAMPLES 21:00 - 23:00 2.00 STWHIP P WEXIT POOH. PERFORM IN/OUT JOG NEAR SURFACE. 23:00 - 00:00 1.00 STWHIP P WEXIT PJSM. UD WINDOW MILLING BHA.GUAGE STRING MILL 2.73"NO GO,2.74"GO.GUAGE WINDOW MILL.2.72"NO GO,2.73"GO.WELL STABLE. 1/5/2011 00:00 - 01:00 1.00 DRILL P PROD1 M/U 2.4 DEG MOTOR AND BUILD ASSEMBLY AS PER BAKER DD. Q£A 01:00 - 02:30 1.50 DRILL P PROD1 RIH W/BUILD ASSEMBLY TO 8635 LOGGING DEPTH. 02:30 - 04:00 1.50 DRILL P PROD1 LOG TIE IN FROM 8635'TO 8795',-9' CORRECTION.TOW @ 9660.5', BOW @ 9665.5'. 04:00 - 06:00 2.00 DRILL P PROD1 CONTINUE IN HOLE,SHUT DOWN PUMP THRU WINDOW,CLEAN,TAG @ 9676'.26K sj UP, 17K DOWN,2800 PSI FREE SPIN @ 1.5 BPM. TF 70 DEG LEFT OF HS.WOB 1K, l] ' 225 PSI MOTOR WORK.COMMENCE /(fit;✓ DRILLING BUILD SECTION �/ 06:00 - 06:30 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 9750' rib 06:30 - 07:15 0.75 DRILL P PROD1 DRILL AHEAD AT 2720 PSI AND 1.55 BPM 07:15 - 08:30 1.25 DRILL P PROD1 STANDBY FOR QUESTIONABLE DD SURVEYS(DLS>80 DEGREES) 08:30 - 10:15 1.75 DRILL P PROD1 SORT OUT BAD SURVEY AND DRILL AHEAD FOR ADDITIONAL SURVEY POINTS. Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 5 of 7 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00©66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:15 - 12:30 2.25 DRILL P PROD1 DRILL AHEAD AT 2600 PSI AND 1.5 BPM 12:30 - 12:45 0.25 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 9915' 12:45 - 14:30 1.75 DRILL P PROD1 LAND BUILD SECTION AT 10051' 14:30 - 17:30 3.00 DRILL P PROD1 POOH. CONDUCT PJSM FOR LD/MU OF BHA ON TRIP OUT OF HOLE 17:30 - 18:45 1.25 DRILL P PROD1 PJSM. UD BUILD SECTION BHA, PICK UP LATERAL SECTION BHA. 18:45 - 20:30 1.75 DRILL P PROD1 RIH W/LATERAL SECTION BHA. 20:30 - 21:00 0.50 DRILL P PROD1 LOG',TIE IN, -10 1/2' CORRECTION. 21:00 - 21:30 0.50 DRILL P PROD1 COMMENCE DRILLING LATERAL @ 10,051'. 2700 PSI FREESPIN.200-300 PSI MOTOR WORK. -TF 100 R,WOB 1-2K. ROP 100-150 FPH. 21:30 - 22:30 1.00 DRILL P PROD1 CHANGE OUT MUD SYSTEM, BEGIN PUMPING NEW MUD WHILE DRILLING. 22:30 - 23:30 1.00 DRILL P PROD1 WIPER TRIP TO THE WINDOW. 23:30 - 00:00 0.50 DRILL P PROD1 CONTINUE TO DRILL @ TF 100 R,1-2K WOB, NEW FREESPIN @ 2475,250-300 PSI MOTOR WORK. 1/6/2011 00:00 - 00:30 0.50 P PROD1 DRILLING LATERAL:TF 85-95L.WOB 2K -1.5 BPM/2480 FS,250 PSI MOTOR WORK -DRILLING @ 10,290',ROP DOWN TO 20 FPH. 00:30 - 00:45 0.25 DRILL P PROD1 SHORT WIPER TRIP 00:45 - 02:30 1.75 DRILL P PROD1 DRILLING(SHALE),TO 10,330'.ROP AVG 30 FPH -TF 100-115L.WOB 2.5K 29K UP WT,12.5K DOWN -DRILL TO 10,350'ROP UP TO 150 FPH. 02:30 - 03:30 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. 03:30 - 05:30 2.00 DRILL P PROD1 CONTINUE DRILLING LATERAL; -TF50-75L, ROP 110FPH -100 PSI MOTOR WORK,1K WOB. -DRILL TO 10,500'. 05:30 - 06:00 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW&LOG A TIE IN. ADD 4 1/2'. 06:00 - 07:00 1.00 DRILL P PROD1 CONTINUE WIPER TRIP TO BOTTOM. HAD TO WORK THROUGH SHALE INTERVAL FROM .� 10280'-10330'MD. ABLE TO RUN PAST WITH REDUCED PUMP RATE(.?BPM)AND ROP OF 45 FPM. 07:00 - 07:45 0.75 DRILL P PROD1 DRILL AHEAD FROM 10500'WITH 1.6 BPM AND 2700 PSI. • 07:45 - 10:30 2.75 DRILL P PROD1 SHORT TRIP TO WINDOW FROM 10538'DUE TO WEIGHT TRANSFER ISSUES. CONTINUE WIPING TO TOP OF 3-3/16"LINER AT MAX RATE THROUGH THE BIT TO 8300' 10:30 - 12:50 2.33 DRILL P PROD1 DRILL AHEAD FROM 10538' 12:50 - 14:45 1.92 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 10650' 14:45 - 16:30 1.75 DRILL P PROD1 DRILL AHEAD FROM 10650' 16:30 - 19:00 2.50 DRILL P PROD1 WIPER TRIP FROM 10801'TO TOP OF 3-1/2" LINER AT-8300' Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name: F-28 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 19:45 0.75 DRILL P PROD1 DRILL AHEAD F/10,801'.TF 70L,1.6 BPM/ 2850 PSI CIRC PRESSURE -ROP @ 125-150 FPH. -DRILL AHEAD TO 10,860'.STACKED OUT ..NEW MUD GOING AROUND 19:45 - 20:00 0.25 DRILL P PROD1 WIPER TRIP/BHA 20:00 - 21:30 1.50 DRILL P PROD1 . DRILL AHEAD,ROP 80-90 FPH. -75L, 1K WOB, 100-150 PSI MOTOR WORK. 21:30 - 23:30 2.00 DRILL P PROD1 WIPER TRIP TO 8300' 23:30 - 00:00 0.50 DRILL P PROD1 LOG TIE IN PLUS 15'CORRECTION. 1/7/2011 00:00 - 00:45 0.75 DRILL P PROD1 CONITINUE TO RBIH FROM WIPER TRIP TO 8300'&TIE IN LOG. _ 00:45 - 03:15 2.50 DRILL P PROD1 DRILL AHEAD F/10,963'.TF 70-90L. 1.7 BPM @3146 PSI. -1K WOB,100 PSI MOTOR WORK.TD @ 11,120' 03:15 - 07:00 3.75 DRILL P PROD1 WIPER TRIP TO 8300'. (FAIRLY CLEAN),RBIH, LOG TIE IN, PLUS 5 1/2'CORRECTION. - 31K UP WT, 14K DOWN WT. HAD TO WORK BACK TO BOTTOM WITH ERRATIC WEIGHTS AND SET DOWNS. HAD TO REDUCE PUMP RATES IN SOME CASES TO.5 BPM 07:00 - 13:30 6.50 DRILL P PROD1 WIPER TRIP TO 8300'FROM TD OF 11122' ATTEMPT TO CLEAN UP SHALE INTERVAL FROM 10280'TO 10330'WITH 300 TO 400 PSI MOTOR WORK ON UP PASSES AND 6K-10K OVERPULLS ECD= 10.43 PPG. SET DOWNS NOTED AT 10287'AND 10312'WITH MOTOR WORK NOTED ON SET DOWNS. HAD TO DROP PUMPS TO.5 BPM TO RUN THROUGH PROBLEM AREAS WITH CONSISTENT SET DOWNS ACROSS INTERVAL. CONTINUE TO WORK SHALE AREA. CLEAN OUT TO TOP OF 3-1/2"LINER AT-1.9 BPM THROUGH THE BIT. OPEN EDC AT TOP OF LINER AND RUN IN HOLE ACROSS THE WINDOW WHILE PUMPING-2.5 BPM. HEAVY SHALE RETURNS NOTED AT THE SHAKER AT CALCULATED BOTTOMS UP FROM WINDOW. CLOSE EDC AT TOP OF LINER AND RUN IN HOLE PUMPING THROUGH THE BIT AT 1.81 BPM 13:30 - 13:40 0.17 DRILL P PROD1 LOG TIE-IN FROM 9650'. CORRECT+5.5' 13:40 - 14:50 1.17 DRILL P PROD1 RIH TO CONFIRM TD. SET DOWN AT 10307'. DROP PUMP RATE TO .5 BPM AND RUN PAST. SET DOWN AT --(1)10329', DROP PUMP RATE AND RUN PAST. 14:50 - 17:00 2.17 DRILL P PROD1 TAG TD AT 11135.4' WIPER TRIP TO WINDOW &ON UP TO 8275'W/EDC OPEN 17:00 - 17:45 0.75 DRILL P PROD1 CONTINUE TO 6700',PUMPING MAX RATE. 17:45 - 18:15 0.50 DRILL P PROD1 RBIH TO WINDOW,EDC OPEN,PUMPING 2.6 BPM/ 3550 PSI. 18:15 - 20:30 2.25 DRILL P PROD1 WIPER TRIP ON BACK UP TO 6700'. Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 7 of 7 Operation Summary Report Common Well Name:F-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 1/1/2011 End Date: 1/8/2011 X3-00Y26-C: (1,140,201.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00©66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 DRILL P PROD1 RBIH, EDC OPEN, PUMPING MAX RATE TO WINDOW,CLOSE EDC. 21:30 - 22:00 0.50 DRILL P PROD1 THROUGH WINDOW,CLOSE EDC,TIE IN LOG, ADD 7'CORRECTION. 22:00 - 00:00 2.00 DRILL P PROD1 CONTINUE IN HOLE,EDC CLOSED,1.6 BPM/ 2875 PSI. -AREA FROM 10,275'-10,350'WAS CLEAN 11 FPM/1,6 BPM -PUMPED 10 BBLS/10 PPG SWEEP,COMING AROUND NOW. -SET DOWN @ 10,520',WORKED THIS AREA, NOT MUCH MOTOR WORK -WORK THIS AREA,PUMP 2ND 1OPPG SWEEP. 1/8/2011 00:00 - 01:30 1.50 DRILL P PROD1 ENCOUNTER RESISTANCE @ 10,730' -SETTING DOWN W/LITTLE OR NO MOTOR WORK TF 70L. -NO OVERPULLS,JUST SETTING DOWN. -WORK AREA AT VARIOUS PUMP SPEEDS STILL SETTING DOWN -ABLE TO RUN IN HOLE WITHOUT PUMP. RUN TO TD,11,130', NO HANGUPS,40 FPM. 01:30 - 03:00 1.50 DRILL P PROD1 BRING ON PUMP,1.7 BPM/3050 PSI. -PULL UP TO 10,600, RBIH W. PUMP OFF. -SEE A FEW HANGUPS AROUND 10,900'7 11,035-11,045' -EACH TIME, PICK UP(1)TIME&RUN ON IN TO TD. 03:00 - 05:00 2.00 DRILL P PROD1 CHASE LAST SWEEP UP TO WINDOW,RBIH. -SET DOWN @ 10,730',WORKED THRU OK. PUMPS OFF TO TD. 05:00 - 06:00 1.00 DRILL P PROD1 LAY IN LINER PILL FROM TD.POOH.PAINT FLAGS @ 9322'(MD)&7900'(EOP). 06:00 - 08:30 2.50 DRILL P PROD1 POOH 08:30 - 09:00 0.50 DRILL P PROD1 LD LATERAL BHA. Printed 1/17/2011 10:57:55AM North America -ALASKA- BP Page 1 of 4 Operation Summary Report Common Well Name: F-28 AFE No Event Type: COM-ONSHORE (CON) Start Date: 1/8/2011 End Date: 1/16/2011 X3-00Y26-C: (376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/8/2011 09:00 - 10:30 1.50 RPRIN P RUNPRD INSTALL NEW CHECK VALVES IN UQC,PT AND CHART TO 1500PSI. 10:30 - 10:45 0.25 RPRIN P RUNPRD PSJM REGARDING LINER RUNNING. DISCUSS MUSTER AREA,GOOD COMMUNICATION AND THE OBLIGATION TO STOP THE JOB. 15:30 - 00:00 8.50 RPRIN N WAIT RUNPRD RECIPROCATE COILED TUBING WHILE PUMPING.8 BPM NEAR WINDOW DEPTH OF 9660'. 10:45 - 11:00 0.25 RPRIN P RUNPRD BEGIN RUNNING LINER 11:00 - 13:30 2.50 RPRIN N WAIT RUNPRD PREPARE OPERATIONS FOR STANDBY DUE TO FIELD WIDE SHUT-DOWN, PULL AND LD LINER. 13:30 - 15:30 2.00 RPRIN N WAIT RUNPRD RIH WITH NOZZLE BHA TO CIRCULATE AT WINDOW FOR STAND DOWN PER FIELD SUPERINTENDENT REQUEST. 1/9/2011 00:00 - 06:00 6.00 RPRIN N. WAIT 11,130.00 RUNPRD RECIPROCATE COILED TUBING WHILE PUMPING.6 BPM NEAR WINDOW DEPTH OF 9660'. 06:00 - 00:00 18.00 RPRIN N WAIT 11,130.00 RUNPRD RECIPROCATE COILED TUBING WHILE PUMPING.6 BPM NEAR WINDOW DEPTH OF 9660'. 0/A BEING CHECKED AT LEAST(2)TIMES TOURLY AND POTENTIAL LEAK ON STARTING HEAD MONITORED.NO VISIBLE LEAKAGE TO DATE. 1/10/2011 00:00 - 06:00 6.00 RPRIN N WAIT RUNPRD RECIPROCATE COILED TUBING WHILE PUMPING.6 BPM NEAR WINDOW DEPTH OF 9660'. 0/A BEING CHECKED AT LEAST(2)TIMES TOURLY AND POTENTIAL LEAK ON STARTING HEAD MONITORED. NO VISIBLE LEAKAGE TO DATE. 06:00 - 12:30 6.50 RPRIN N WAIT RUNPRD CONTINUE TO CIRCULATE AT.58 BPM @ 9660' 12:30 - 14:00 1.50 RPRIN N WAIT RUNPRD POOH TO PERFORM SCHFQULEIIBQa FUNCTION TEST 14:00 - 15:00 1.00 RPRIN N WAIT RUNPRD OOH. STAND BACK INJECTOR AND PREPARE TO FUNCTION TEST BOPS. t. 15:00 - 16:00 1.00 BOPSUR N WAIT RUNPRD FUNCTION TEST BOPS 16:00 - 17:30 1.50 BOPSUR N WAIT RUNPRD RIH TO WINDOW DEPTH 17:30 - 00:00 6.50 RPRIN N WAIT RUNPRD CIRCULATE AT WINDOW. .54 BPM @ 1311 PSI. MM IN TEMP=76F,MM OUT TEMP=75.4F 1/11/2011 00:00 - 00:00 24.00 CASING N WAIT 11,130.00 RUNPRD CIRCULATING 9.2 PPG GEO-VIS @.5 BPM/ 1250 PSI WHILE RECIPROCATING PIPE F 8200'-9600'. IA OPSI,OA 35PSI,PVT 290BBLS. 1/12/2011 00:00 - 12:00 12.00 CASING N WAIT 11,130.00 RUNPRD CIRCULATING 9.2 PPG GEO-VIS @.5 BPM/ 1250 PSI WHILE RECIPROCATING PIPE F 8200'-9600'. IA OPSI,OA 35PSI,PVT 290BBLS. Printed 1/17/2011 10.58:13AM North America -ALASKA- BP Page 2 of 4 Operation Summary Report Common Well Name: F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 1/8/2011 End Date: 1/16/2011 X3-00Y26-C: (376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 CASING N WAIT 11,130.00 RUNPRD CIRCULATING 9.2 PPG GEO-VIS @.45 BPM/ 1230 PSI WHILE RECIPROCATING PIPE F 8200'-9600'. IA OPSI,OA 38PSI,PVT 288BBLS. CLEAN MOTOR ROOM AND WORK ON MOTHLY CRITICAL ITEMS LIST 1/13/2011 00:00 - 13:00 13.00 CASING N WAIT 11,130.00 RUNPRD FIELD WIDE SHUT DOWN. CIRCULATING 9.2 PPG GEO-VIS @.45 BPM/ 1230 PSI WHILE RECIPROCATING PIPE F 8200'-9600'. IA OPSI,OA 38PSI,PVT 289BBLS. 13:00 - 15:00 2.00 CASING N MISC 11,130.00 RUNPRD POOH FOR CLEAN OUT BHA.SAME BHA AS DRILLED LATERAL. 15:00 - 15:15 0.25 CASING N MISC 11,130.00 RUNPRD PJSM TO STANDBACK INJECTOR AND LD NOZZLE BHA. 15:15 - 16:00 0.75 CASING N MISC 11,130.00 RUNPRD LD NOZZLE BHA. RD BHI UQC. BOOT E-LINE AND STAB ON WELL. 16:00 - 17:15 1.25 CASING N MISC ` 11,130.00 RUNPRD INSPECT INJECTOR CHAINS. 17:15 - 18:00 0.75 CASING N MISC 11,130.00 RUNPRD REHEAD CTC. PULL TEST TO 35K. PRESSURE TEST TO 3500PSI. 18:00 - 20:00 2.00... CASING N MISC 11,130.00 RUNPRD .REHEAD E-LINE. PT UQC 5 MIN 250PSI LOW/5 MIN 1500 PSI HIGH 20:00 - 20:15 0.25 CASING N MISC 11,130.00 RUNPRD PJSM TO MU BHA 6 20:15 - 22:00 1.75 CASING N MISC 11,130.00 RUNPRD MU BHA 6 SAME AS LATERAL DRILLING BHA_ 4. HYC 3"BI-CENTER BIT,2.375"BHI 1.2° X-TREME MOTOR,HOT, DGS, DPS,EDC, P&C, WEAR SUB,LQC,UQC,KENDALL CTC. 22:00 - 23:40 1.67 CASING N MISC 11,130.00 RUNPRD RIH PUMPING.22BPM,1300PSI,98FPM,PVT 286 @8,740'. IN RATE.22BPM OUT RATE.62BPM.NO LOSSES. 23:40 - 00:00 0.33 EVAL N MISC 11,130.00 RUNPRD GR TIE IN LOG FROM 9675'TO 9700'AT 90 FPH. SLIGHT MOTOR WORK JUST BELOW WINDOW. -10'CORRECTION. LOADED 30 BBL DOUBLE LSRV LINER RUNNING PILL INTO ISOLATED PIT 4. 1/14/2011 00:00 - 01:45 1.75 CASING N MISC 11,130.00 RUNPRD RAN TO BOTTOM GLEAN TAGGED AT, 11,133.5'. (STILL CALLING OFFICIAL TD 11,130'). CLEAN HOLE UP TO 10,600'THEN BACK TO BOTTOM. PUMPING 1.5 BPM @ 3,000 PSI. 01:45 - 03:15 1.50 CONDHL N MISC 11,130.00 RUNPRD PUMP 5 BBL DOUBLE LSRV SWEEP. POOH 20 FPM TO WINDOW PUMPING 1.7 BPM AT 3065 PSI. UP WT 26K. IA 0,OA 46 PSI 03:15 - 04:30 1.25 CONDHL N MISC 11,130.00 RUNPRD RUN BACK TO BOTTOM. SETTING DOWN AT 10,284'TO 10,330'AND AGAIN AT 10,600'TO 10,950'. BLEED OA FROM 48 TO 12 PSI,WITHIN COUPLE OF MINUTES IT WAS RIGHT BACK TO 38 PSI. Printed 1/17/2011 10:58.13AM North America -ALASKA- BP Page 3 of 4 Operation Summary Report Common Well Name: F-28 j AFE No Event Type:COM-ONSHORE(CON) Start Date: 1/8/2011 End Date: 1/16/2011 'X3-00Y26-C: (376,334.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00 @66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:45 2.25 CONDHL N MISC 11,130.00 RUNPRD WIPER TRIP TO WINDOW FROM 11,133.5'. PUMP SECOND SWEEP ON WAY OUT. 06:45 - 08:00 1.25 CONDHL N MISC 11,130.00 RUNPRD RUN BACK TO BOTTOM AT 20 FPM WHILE PUMPING 1.5 BPM. SET DOWN AT 10,320'AND RUN BY. 08:00 - 08:50 0.83 CONDHL N MISC 11,130.00 RUNPRD LAY IN LINER RUNNING PILL WITH STICKLESS 20 BEADS FROM 11,134'. SLIGHT OVERPULLS FROM 10,285'-10,357'. 08:50 - 09:15 0.42 CONDHL N MISC 11,130.00 RUNPRD OPEN EDC AT 9458.2' PAINT EOP FLAG AT 9458.2'MD.(WHITE)PUH TO NEXT FLAG DEPTH OF 7958.2'MD. (YELLOW)PUMP 2.3 BPM @ 3,430 PSI. 09:15 - 11:05 1.83 CONDHL N MISC 11,130.00 RUNPRD POOH PUMPING AT 2.3 BPM AND 3,430 PSI. 11:05 - 11:30 0.42 CONDHL N MISC 11,130.00 RUNPRD OOH, BEGIN LAYING DOWN CLEAN OUT BHA. 11:30 - 11:45 0.25 CONDHL N MISC 11,130.00 RUNPRD PJSM FOR RUNNING LINER. 11:45 - 15:15 3.50 CASING P RUNPRD BEGIN MAKING UP 2-7/8"SLOTTED LINER, 15:15 - 19:30 4.25 CASING P RUNPRD MU INJECTOR TO WELL AND RIH WITH LINER,EDC OPEN SET DOWN AT 10,310'AND 10,620'. 19:30 - 20:00 0.50 CASING P RUNPRD SET DOWN WITH 10K AT 11,142.2'. UP WT 40K. THE LAST GR TIE CORRECTION WAS-10'. THAT PUTS US AT 11,132.2'(OFFICIAL TD STILL AT 11,130'). CLOSE ECD AND PUMP 1.65 BPM @ 4100PSI TO_RELEASE FROM LINER. UP WT 20K.GOOD RELEASE. 20:00 - 22:30 2.50 CASING P RUNPRD SWAP WELL TO 2%KCL PUMPING OFF TRUCK. EMPTY AND CLEAN PITS.FILL PITS WITH 2% KCL. IN MM READS 1.63 AND OUT MM READS 1.68 22:30 - 23:00 0.50 CASING P RUNPRD PULL UP HOLE TO 9060' GR TIE IN FROM 9060'-9091' -5'CORRECTION 23:00 - 00:00 1.00 CASING P RUNPRD POOH 100 FPM,PUMPING 1.3BPM, EDC CLOSED. 1/15/2011 00:00 - 00:30 0.50 CASING P RUNPRD POOH WITH LINER RUNNING BHA. 00:30 - 00:45 0.25 CASING P RUNPRD PJSM TO LD BHA. 00:45 - 02:00 1.25 CASING P RUNPRD STAND BACK INJECTOR AND LD BHA. 02:00 - 03:00 1.00 WHSUR P POST RIH TO 2500'TO FREEZE PROTECT THE WELL WITH 60/40 METHONAL. 03:00 - 03:45 0.75 WHSUR N SFAL 652.00 POST PIN HOLE LEAK NOTICED IN REEL HOUSE 652'FROM BEING OUT OF THE HOLE.PJSM. STOPPED AND PUT A MUFFLER CLAMP ON IT. VERY TINY HOLE,LIGHT MIST,NO DRIPS. SLB SUPERVISOR SAW IT AS IT PAST HIS CAMERA. 03:45 - 04:00 0.25 WHSUR P POST FINISHED COMING OUT OF HOLE. 04:00 - 04:30 0.50 WHSUR P POST STOOD BACK INJECTOR AND LD NOZZLE BHA. 10 MINUTE FLOW CHECK GOOD. 04:30 - 05:00 0.50 WHSUR P POST PJSM TO TEST LBRICATOR AND SET BPV. Printed 1/17/2011 10:58:13AM North America -ALASKA- BP Page 4 of 4 Operation Summary Report Common Well Name: F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 1/8/2011 End Date: 1/16/2011 X3-00Y26-C: (376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active Datum:29:28 9/19/1986 00:00©66.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 09:30 4.50 WHSUR P POST LOAD LURICATOR TO FLOOR.CREW CHANGE,PT AND CHART MASTER AND SSV. PT AND CHART LUBRICATOR. SET BPV. 09:30 - 12:30 3.00 WHSUR P POST, BLOW DOWN REEL WITH N2. 12:30 - 14:30 2.00 WHSUR P POST REMOVE PACKOFF AND CO PACKOFFBRASS. RD HARDLINE IN REEL. CLEAN PITS. 14:30 - 14:45 0.25 WHSUR P POST PJSM TO PULL COIL TO REEL AND SECURE. 14:45 - 18:00 3.25 WHSUR P POST MU GRAPPLE AND PULL COIL TO REEL AND SECURE. 18:00 - 18:30 0.50 WHSUR P POST PJSM TO SWAP REELS. 18:30 - 23:00 4.50 WHSUR P POST SWAP REELS. 23:00 - 00:00 1.00 WHSUR P POST PUMP FLUILD OUT OF TREE AND REPLACE WITH NEAT METHONAL. 1/16/2011 00:00 - 02:00 2.00 WHSUR P POST SLIP AND CUT 45'DRILL LINE.CHECK CROWN 0 MATIC. 02:00 - 07:00 5.00 WHSUR P POST REBUILD CHOKE MANIFOLD VALVES 1 &2. INSTALL HARDLINE IN REEL. INSPECT RAMS IN BOP. 07:00 - 12:00 5.00 WHSUR P POST INSTALL GRAPPLE,PULL COIL TO INJECTOR. 12:00 - 17:00 5.00 WHSUR P POST NIPPLE DOWN BOPE. TEST TREE CAP TO 4000PSI. RELEASE RIG 17:00 SEE 18-13C FOR FURTHER OPERATIONS. Printed 1/17/2011 10:58:13AM • s BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-28 - Slot 28 500292164900 F-28B Survey: MWD Survey Report - Geographic 11 January, 2011 pr0 f- 1Nuala Survey Report-Geographic Z , p INTEQ tiN0 Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: 29:28 9/19/1986 00:00 @ 66.70ft(generic drillinc Site: PB F Pad MD Reference: 29:28 9/19/1986 00:00 @ 66.70ft(generic drillinc Well: F-28 North Reference: True Wellbore: F-28B Survey Calculation Method: Minimum Curvature Design: F-28B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29ft Latitude: 70° 19'55.283 N From: Map Easting: 650,960.70ft Longitude: 148°46'31.468 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-28 API No 500292164900 I Well Position +NI-S 0.00 ft Northing: 5,973,893.00 ft Latitude: 70°20'8.377 N +EI-W 0.00 ft Easting: 652,650.00 ft Longitude: 148°45'41.338 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 35.50 ft Wellbore F-28B API No 500292164902 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 12/31/2010 21.86 80.96 57,711 Design F-28B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,645.39 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 31.20 0.00 0.00 24.83 Survey Program Date: 1/11/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,000.00 1 :Sperry-Sun BOSS gyro multi(F-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,069.00 9,645.39 MWD(F-28A) MWD MWD-Standard 9,660.00 11,130.00 MWD(F-28B) MWD MWD-Standard 1/11/2011 10:58:39AM Page 2 COMPASS 2003.16 Build 73 1 ! 8Sp Survey Report-Geographic 0 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: 29:28 9/19/1986 00:00 @ 66.70ft(generic drillinc Site: PB F Pad MD Reference: 29:28 9/19/1986 00:00 @ 66.70ft(generic drillinc Well: F-28 North Reference: True Wellbore: F-28B Survey Calculation Method: Minimum Curvature Design: F-28B • Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,645.39 87.49 92.92 9,057.01 391.47 1,208.05 5,974,308.95 653,849.75 70°20' 12.226 N 148°45'6.057 W TIP 9,660.00 88.20 90.76 9,057.56 391.00 1,222.64 5,974,308.78 653,864.34 70°20' 12.221 N 148°45'5.631 W KOP 9,699.26 91.66 73.32 9,057.61 396.42 1,261.37 5,974,314.98 653,902.95 70°20' 12.275 N 148°45'4.500 W 9,734.50 88.40 57.66 9,057.59 410.99 1,293.33 5,974,330.20 653,934.60 70°20' 12.418 N 148°45'3.566 W 9,764.14 87.48 44.49 9,058.66 429.56 1,316.32 5,974,349.23 653,957.21 70°20' 12.600 N 148°45'2.895 W 9,794.70 90.55 29.86 9,059.18 453.83 1,334.73 5,974,373.87 653,975.12 70°20' 12.839 N 148°45'2.357 W 9,824.40 92.92 24.55 9,058.29 480.23 1,348.30 5,974,400.53 653,988.15 70°20' 13.099 N 148°45' 1.960 W 9,855.24 87.54 38.21 9,058.16 506.48 1,364.32 5,974,427.11 654,003.62 70°20' 13.357 N 148°45'1.492 W 9,884.44 79.81 29.38 9,061.38 530.55 1,380.44 5,974,451.50 654,019.26 70°20' 13.594 N 148°45 1.021 W 9,914.84 80.93 15.50 9,066.49 558.18 1,391.85 5,974,479.35 654,030.10 70°20' 13.865 N 148°45'0.688 W 9,954.58 88.96 0.69 9,070.01 597.23 1,397.37 5,974,518.51 654,034.82 70°20' 14.249 N 148°45'0.527 W 9,995.58 92.15 341.24 9,069.61 637.52 1,390.97 5,974,558.66 654,027.60 70°20' 14.646 N 148°45'0.713 W 10,023.96 90.28 328.07 9,069.00 663.11 1,378.85 5,974,583.99 654,014.96 70°20' 14.897 N 148°45' 1.067 W 10,051.29 92.36 315.98 9,068.37 684.61 1,362.07 5,974,605.14 653,997.75 70°20' 15.109 N 148°45' 1.557 W 10,081.63 97.14 323.04 9,065.86 707.58 1,342.45 5,974,627.70 653,977.67 70°20' 15.335 N 148°45'2.130 W 10,110.41 96.57 327.91 9,062.42 731.11 1,326.26 5,974,650.90 653,961.01 70°20' 15.566 N 148°45'2.603 W 10,141.87 93.87 333.75 9,059.56 758.45 1,311.00 5,974,677.92 653,945.20 70°20'15.835 N 148°45'3.048 W 10,170.81 92.86 340.80 9,057.86 785.08 1,299.85 5,974,704.32 653,933.50 70°20' 16.097 N 148°45'3.374 W 10,201.17 92.36 346.78 9,056.47 814.19 1,291.39 5,974,733.25 653,924.45 70°20'16.383 N 148°45'3.621 W 10,231.69 93.19 352.92 9,054.99 844.19 1,286.02 5,974,763.12 653,918.47 70°20'16.678 N 148°45'3.778 W 10,260.33 90.18 347.24 9,054.15 872.37 1,281.09 5,974,791.20 653,912.97 70°20'16.956 N 148°45'3.921 W 10,290.03 89.14 340.80 9,054.33 900.91 1,272.91 5,974,819.56 653,904.22 70°20'17.236 N 148°45'4.160 W 10,320.81 87.39 336.23 9,055.26 929.53 1,261.65 5,974,847.94 653,892.38 70°20'17.518 N 148°45'4.489 W 10,351.09 85.88 329.47 9,057.04 956.41 1,247.87 5,974,874.54 653,878.05 70°20'17.782 N 148°45'4.891 W 10,381.73 86.10 321.75 9,059.18 981.61 1,230.62 5,974,899.38 653,860.29 70°20'18.030 N 148°45'5.395 W 10,411.37 87.85 314.44 9,060.75 1,003.62 1,210.86 5,974,920.99 653,840.09 70°20' 18.246 N 148°45'5.972 W 10,440.97 91.69 308.44 9,060.87 1,023.20 1,188.68 5,974,940.11 653,817.52 70°20'18.439 N 148°45'6.620 W 10,470.69 94.48 303.08 9,059.27 1,040.54 1,164.61 5,974,956.95 653,793.11 70°20' 18.610 N 148°45'7.322 W 10,497.75 90.80 297.87 9,058.02 1,054.24 1,141.33 5,974,970.17 653,769.55 70°20' 18.744 N 148°45'8.003 W 10,524.67 91.23 289.79 9,057.54 1,065.10 1,116.73 5,974,980.53 653,744.74 70°20'18.851 N 148°45'8.721 W 10,554.89 89.72 285.90 9,057.29 1,074.36 1,087.97 5,974,989.20 653,715.80 70°20' 18.942 N 148°45'9.561 W 10,589.43 90.06 294.99 9,057.36 1,086.41 1,055.64 5,975,000.59 653,683.23 70°20' 19.061 N 148°45'10.505 W 10,615.15 89.66 301.77 9,057.42 1,098.63 1,033.02 5,975,012.35 653,660.37 70°20'19.181 N 148°45'11.166 W 10,654.77 90.06 311.90 9,057.52 1,122.35 1,001.35 5,975,035.42 653,628.23 70°20' 19.414 N 148°45 12.091 W 10,684.61 91.07 319.97 9,057.22 1,143.78 980.62 5,975,056.41 653,607.06 70°20'19.625 N 148°45'12.696 W 10,714.63 90.89 327.20 9,056.71 1,167.91 962.81 5,975,080.18 653,588.77 70°20'19.863 N 148°45'13.216 W 10,744.77 90.92 334.26 9,056.23 1,194.19 948.09 5,975,106.15 653,573.52 70°20'20.121 N 148°45'13.646 W 10,774.83 90.09 337.33 9,055.97 1,221.60 935.77 5,975,133.30 653,560.64 70°20'20.391 N 148°45'14.006 W 10,804.69 90.15 329.31 9,055.91 1,248.26 922.37 5,975,159.68 653,546.70 70°20'20.653 N 148°45 14.397 W 10,834.75 90.55 322.86 9,055.72 1,273.19 905.61 5,975,184.27 653,529.44 70°20'20.898 N 148°45'14.887 W 10,865.31 89.88 315.84 9,055.61 1,296.36 885.71 5,975,207.02 653,509.08 70°20'21.126 N 148°45'15.468 W 10,898.33 89.45 308.01 9,055.80 1,318.41 861.16 5,975,228.56 653,484.09 70°20'21.343 N 148°45'16.185 W 10,944.77 89.02 300.93 9,056.42 1,344.67 822.91 5,975,254.04 653,445.31 70°20'21.601 N 148°45'17.302 W 10,974.19 89.82 294.36 9,056.72 1,358.31 796.86 5,975,267.15 653,418.99 70°20'21.735 N 148°45'18.063 W 11,004.65 90.68 288.41 9,056.59 1,369.41 768.51 5,975,277.67 653,390.42 70°20'21.845 N 148°45'18.891 W 11,042.57 90.80 279.75 9,056.10 1,378.63 731.77 5,975,286.14 653,353.50 70°20'21.935 N 148°45'19.964 W 11,075.85 90.83 273.78 9,055.62 1,382.55 698.74 5,975,289.38 653,320.40 70°20'21.974 N 148°45'20.929 W 11,093.93 90.03 269.31 9,055.49 1,383.04 680.67 5,975,289.50 653,302.33 70°20'21.979 N 148°45'21.457 W 11,130.00 90.03 269.31 9,055.47 1,382.60 644.60 5,975,288.33 653,266.28 70°20'21.974 N 148°45'22.510 W TD-2 3/8" 1/11/2011 10:58:39AM Page 3 COMPASS 2003.16 Build 73 TREE= . " 4"CM/ SAFETY 3: WELL ANGLE>70°@ 9291'*** t{VFiLLHEAD= McEVOYCOMPOSI.—r11RAP REPAIR SH LEAK-DO NOT MIT-OA ACTUATOR____ =�AXELSON PJC DRAFT _ Q V OVER 1200 PSI DUE TO DESIGNED PRESSURE RATING OF KB.ELEV= ^66.7' REPAIR AND DO NOT PUMP METH OR METH BLEND INTO BF. ELEV= 38' OA DUE TO CHEM INCOMPATIBILITY W/EPDXY RESIN IN KOP= 6700' WRAP*** Max Angle= 97"@ 10082' \� Datum MD= 9041' 2085' --I4-1/2"OTIS SSSV NIP, ID=3.813" Datum TVD= 8800'S-- 11 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH SIZE DATE 13-3/8"CSG,72#,L-80, ID=12.347" —{ 2675' P7 p2978 2978 1 OTIS DOME RM 16 02/13/11 F6 F4774 4774 r 0 OTIS SO RM ' 20 02/13/11 F5 5904 5903 F 1 OTIS DMY RA ' 0 05/20/04 '4 p6640 6638 F 8 OTIS DMY RA F 0 05/20/04 F3 F7180 7161 F 18 OTIS DMY RA F 0 05/20/04 Minimum ID = 1.995" @ 9597' 2 7758 7698 24 OTIS DMY RA 0 05/20/04 TOP OF 2-3/8" SLOTTED LINER 1 8140 8045 25 OTIS DMY RA 0 05/20/04 8209' —4-1/2"OTIS XA SLIDING SLV,ID= 3.813" Mr ..------1 8268' —1TIW TBG SEAL ASSY rrf 8283' —9-5/8"X 4-1/2" TM/HHBP PKR,ID=4.750" _ 8288' IH MILL OUT EXTENSION,ID=6.004" TOP OF 7"LNR — 8321' - —1 8321' —17"BROWN SHORTY HYD.LNR HNGR 8325' 14-1/2"OTIS X NIP, ID=3.813" 1• 8349' —3.7"BKR DEPLOYMENT SLV, ID=3.0" 8357' l 4-1/2"OTIS XN NIP, MILLED ID=3.80" (BEHIND CT LNR) 8369' —3-1/2"HES X NIP,ID=2.813" 4-1/2"TBG, 12.64,L-80 BUTT, .0152 bpf,ID=3.958" —1 8391' / \— J 8391' —4-1/2"WLEG(BEHIND CT LNR) 3-1/2"LNR,8.81#,L-80 STL, .0087 bpf,ID=2.992" H 8401' , 8401' —13-1/2"X 3-3/16"XO, D=2.786" I 9-5/8"CSG,47#,L-80,ID=8.681" —1 8591' , 8845' _1ESTIMATED CEMENT TOP • •' 7"MILLOUT WINDOW(F-28A) 9073' 7"LNR,26#,L-80 TC45,.0383 bpf, ID=6.276" — --9073 I— • 9209' —17"MARKER JOINT TOP OF 2-3/8"LNR —1 9590' _ 9590' — 2.70"BTT DEPLOYMENT SLV,ID=2.250" 3-3/16"BKR PKR WHIPSTOCK(01/04/11) —1 9660' 3-3/16"LNR,6.2#,L-80,.0076 bpf, ID=2.80" — 9678' Ir.I 3-3/16"MILLOUT WINDOW(F-28B) 9660'-9665' PERFORATION SUMMARY REF LOG: 1 -- ANGLE AT TOP PERF: '@' `-- Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE \ 2-3/8" SLOT 9597- 11130 SLTD 01/14/11 2-3/8"SLTD LNR,4.40#, L-80 STL, .0039 bpf,ID=1.995" 11130' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/86 N18E ORIGINAL COMPLETION WELL: F-28B 05/22/04 NORDIC 1 CTD SIDETRACK(F-28A) PERMIT No: 2001620 01/16/11 NORDIC 1 CTD SIDETRACK(F-28B) API No: 50-029-21649-02 02/05/11 PJC DRLG DRAFT CORRECTIONS SEC 2,T11 N,R13E,2359'FSL&2193'FEL 02/26/11 WWR/PJC GLV C/O(02/13/11) 02/26/11 TQ/PJC SFTY NOTE(COMPOSITE WRAP) BP Exploration(Alaska) STATE OF ALASKA ALASKA FEBND GAS CONSERVATION COMMISSIG., 10 ail REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate $tg$ Ci4iili* ar,,t,aisstofl Performed: Alter Casing 0 Pull Tubing❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ All+t.AD4$I o Change Approved Program ❑ Operat.Shutdown❑ Perforate ❑ Re-enter Suspended Well ❑ REPAIR 2.Operator BP Exploration(Alaska),Inc. 4.Well Class Before Work: 5.Permit to Drill Number: Name: Development Q Exploratory ❑ s 210-1620 3.Address: P.O.Box 196612 Stratigraphic Service p 6.API Number: Anchorage,AK 99519-6612 , 50-029-21649-02-00 8.Property Designation(Lease Number): 9.Well Name and Number: ADLO-028280 , PBU F-28B 10.Field/Pool(s): — PRUDHOE BAY FIELD/PRUDHOE OIL POOL 11.Present Well Condition Summary: Total Depth measured 11130 feet Plugs(measured) None feet true vertical 9055.46 feet Junk(measured) None feet Effective Depth measured 11130 feet Packer(measured) 8283 feet true vertical 9055.46 feet (true vertical) 8175 feet Casing Length Size MD ND Burst Collapse Structural Conductor 110 20" SURFACE - 110 SURFACE - 110 Surface 2675 13-3/8"72#L-80 SURFACE - 2675 SURFACE - 2675 5380 2670 Intermediate Production 8593 9-5/8"47#L-80 SURFACE - 8593 SURFACE - 8457 6870 4760 Liner 754 7"26#1-80 8321 - 9075 8209 - 8898 7240 5410 Liner 1189 3-1/2"8.81#L-80 8401 -9590 8282-9055 Liner 1540 2-3/8"6.2#L-80 9590 - 11130 9055 - 9055 Perforation depth: Measured depth: SL 9590-11130 _ _ _ True Vertical depth: 9055-9055 _ Tubing:(size,grade,measured and true vertical depth) 4-1/2"12.6# L-80 SURFACE-8390 SURFACE-8272 Packers and SSSV(type,measured and true vertical depth) 9-5/8" TIW HHBP PKR 8283 8175 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 Subsequent to operation: 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory Development ❑., ` Service p Stratigraphic 0 Daily Report of Well Operations X 16.Well Status after work: Oil ' Q Gas 0 WDSPL ❑ GSTOR 0 WINJ 0 WAG❑ GINJ ❑ SUSP❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: NA Contact Gary Preble Printed Name Gary Pre., Title Data Management Engineer Signature . , / Phone 564-4944 Date 2/11/2011 Form 10-404 Revised 10/2010 7)2 74- .2-/Y.ii i/000� S�mit Original Only F-28B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 2/2/2011 T/I/O=SSV/VAC/0. Temp= SI. Bleed OA to 0 psi and place N2 cap on OA (Pre-furmanite). OA FL @ 36'. Bled OAP from 100 psi to 0 psi. Install 100 psi N2 cap on OA in 10 psi increments as per procedure. Bled OAP to 0 psi. Reinstall N2 cap of 30 psi (see log). Grating needs top be removed to do sandblasting and Furmanite. Monitor for 30 min, OAP remained unchanged. ;Job complete. Final WHPs= 0/VAC/30. SV, WV=Closed. SSV, MV= Open. IA, OA=OTG. NOVP. 2/2/2011T/I/O= MV/VAC/30. Temp= SI. Wellhouse prep (Pre-Furmanite). No AL. Remove cellar grating and floor beams from wellhouse. Containment installed around conductor. Flagged and tagged doors. SV, WV, MV= Closed. SSV= Open. IA, OA= OTG. NOVP. 2/3/2011 T/I/O = MV/VAC/30. Temp = SI. Assist Furmanite (SH repair). N2 cap installed on OA. CCI sand blasted SH to remove —70% of Furmanite wrap in 4 hours. Job incomplete. Will return tomorrow. Final WHPs = MVNAC/30. SV, WV, MV = C. SSV = O. IA, OA=OTG. NOVP. Note: MV remains shut in from well tie in post CTD. 2/4/20111T/1/0 = MVNAC/30. Temp = SI. Assist Furmanite (SH repair). N2 cap installed on OA. CCI sand blasted SH to remove remaining Furmanite wrap in 3 hours (7 hours total to remove Furmanite wrap). Bled OAP to 0 psi in 5 min (all gas). Composite wrap technicians applied initial E-Glass layer to the SH. Held open bleed for 6 hrs. Changed out to night crew. Open bleed continued throughout night shift. No fluid returns from the bleed and WH temp remianed at—80° F throughout night. Job in progress. SV, WV, MV=C. SSV = O. IA, OA=OTG. NOVP. 2/5/20111T/I/O = MV/0/0. Temp=Sl. Continued assisting Furmanite (SH repair). No AL. !Installed initial 4 layers and 10 build layers of composite wrap. Maintained open bleed on OA and monitored heater operation for duration of day. See log for pressure and well house temperature details. WSR continued to 2/6/11. NOTE: Unable to reach swab platform to obtain Tubing pressure due to ladder 'bottom not resting on floor, floor kit removed. SV=?. WV, MV=Closed. SSV = O. Note:WPO aware of MV being closed. 2/6/2011;T/I/O=MVNac/0. Temp = SI. Continued assisting Furmanite (SH repair). 'Maintain an open bleed on OA overnight for composite wrap. Furmanite ;installed 13 build layers of carbon fiber wrap to the starting head. Floor grating ;removed, ladder to the swab platform has no footing, unable to confirm TBG ;pressure. Continued on 2-7-11 WSR. 2/7/2011 T/I/O= MVNAC/0. Temp= SI. Continued assisting Furmanite (SH repair). Maintain open bleed on OA. Furmanite installed final 8 layers of carbon fiber wrap. See Log for Details. Continued from 2-8-11 WSR. 2/8/2011;T/I/O=MVNac/0. Temp=SI. Assist with Furmanite. Continued WSR from 02-1 Furmanite removed peel ply and installed thermal blankets around starting head wrap. Cure started at 10 am; cure temp of 130°reached at 10:30 lam. Maintained open bleed on OA(see log for details). **Job is Incomplete** 2/9/2011 T/I/O=MVNac/0. Temp=Sl. Assist Furmanite (Furmanite wrap). Continued from 02/08/11 WSR. Maintained an open OA bleed to assist Furmanite (see log for details). Cure completed at 2:30 am. SI open bleed at 5:30 am. RDMO. `WV = C. SSV = O. MV = C. IA, OA=OTG. NOVP. 2/9/2011 T/I/O= MVNAC/1. Temp= SI. MIT-OA***PASSED***to 1200 psi w/diesel (Post Furmanite). No AL. OA FL near surface. Rigged up Crystal gauge to IA &OA. Pumped 6 gals of diesel down OA and noticed an audible cracking ;sound coming from Furmanite wrap @ 12 psi. SI, bled OAP to 0 psi. Contacted WIE. Furmanite techs inspected wrap, wrap visiblly appears to have integrity. WIE and Furmanite techs witnessed pumping portion of MIT. Unable to reproduce audible sound. Pumped 18 gals of diesel down OA to reach test (pressure of 1200 psi. SI, monitored for 30 mins. OAP decreased 33 psi in 1st 15 mins, OAP decreased 12 psi in 2nd 15 mins, for a total loss of 45 psi in 30 mins. Furmanite wrap has no signs of leak. Bled OAP to 0 psi. Hung MIT Itags. Removed containment from cellar. Installed floor kit in well house. 1 FW HPs= MV/VAC/0. ***Job complete*** 'SV, WV, MV= C. SSV= O. IA, OA= OTG. NOVP. FLUIDS PUMPED BBLS 24 diesel 24 Total TREE= 4"CW SAFETY h,..ES: COMPOSITE WRAP REPAIR SH WELLHEAD= McEVOY L" z$B OA DUE TO CHEMMINCOMPK-DO NOT PUP METHA INCR OMPATIBILITY W/EPDXYETO H BLEND IN ACTUATOR= AXELSON KB.ELEV= 66.7' Proposed CTD Sidetrack RESIN IN WRAP BF.ELEV= 38' KOP= 6700' Max Angle= 94 9515' 2085' H4-1/2"OTIS SSSV NIP,ID=3.813" I Datum MD= 9041' Datum ND= 8800'SS 13-3/8"CSG,72#, L-80,ID=12.347" —1 2675' I GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH SIZE DATE Minimum ID = 1.995" @ 9597' 7 2978 2978 1 OTIS DOME RM 16 06/29/10 2-3/8" Slotted liner 6 4774 4774 0 OTIS SO RM 20 06/29/10 5 5903 5903 1 OTIS DMY RA 0 4 6639 6638 6 OTIS DMY RA 0 3 7180 7161 17 OTIS DMY RA 0 2 7758 7698 24 OTIS DMY RA . 0 1 8140 8045 25 OTIS DMY RA I 0 8208' —IOTIS XA SLIDING SLV,ID= 3.813" mr i8268' I-1TIW TBG SEAL ASSY g 8283' —19-5/8"TNV HHBP PKR,ID=4.750" 8288' --I MILL OUT EXTENSION, ID=6.004" 8321' —17"BROWN SHORTY HYD.LNR HNGR I ' ' 8325' 1-14-1/2"OTIS X NIP,ID=3.813" I 8349' —I 3.7"BKR DEPLOYMENT SLV,ID=3.0" I 8357' 4-1/2"OTIS XN NIP,MILLED ID=3.80" (BEHIND CT LNR) 4-1/2"TBG, 12.6#,L-80, .0152 bpf,ID=3.958" --I 8390' I ' 8369' —3-1/2"HES X NIP,ID=2.813" 3-1/2"LNR,8.81#,L-80, .0087 bpf,ID=2.992" --I 8401' (•� 8390' —1-1/2"WLEG(BEHIND CT LNR) 9-5/8"CSG,47#,L-80,ID=8.681" --I 8591' I—A 8401' --L3-112"X 3-3/16"XO,ID=2.786" 8845' __I ESTIMATED CEMENT TOP ♦ ►���iI �• �� TOP OF WHIPSTOCK —I 9069' tip 'i�i� 7"LNR,26#,L-80,.0383 bpf,ID=6.276" —I 9073' I _ )4i TOP OF WINDOW(F-28A): 9073' 3-3/16"Packer Whipstock -I 9660' ', __—Top of Liner- 9,590' 3-3/16"LNR,6.2#,L-80,.0076 bpf,ID=2.80" H 9678' I slotted lirr7 ,130 v 9678' —J3-3/16"X2-7/8"X0, ID=2.380" I 10062' I--I 2-7/8"CIBP(03/21/10)I 2-7/8"LNR,6.4#,L-80,.0058 bpf,ID=2.441" I—J 10819' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/86 ORIGINAL COMPLETION 03/22/10 SV GLV TVD CORRECTIONS WELL: F-28B 05/22/04 KAK CTD SIDETRACK(F-28A) 06/29/10 JLJ/PJC GLV C/O(06/29/10) PERMIT No: 2040690 06/01/04 RM-t/KAK GLV C/O 09/23/10 PJC SAFETY NOTE UPDATE API No: 50-029-21649-02 12/08/09 ?/PJC SET PX PLUG(11/18/09) 10/05/10 AER PROPOSED CTD SIDETRACK SEC 2,T11 N,R13E,2359'FSL&2194'FEL 03/02/10 SEW/RPC PX PLUG PULLED(02/14/10) 03/22/10 ACB/SV SET CIBP/ADPERF(03/21/10) BP Exploration(Alaska) OPERABLE: Producer F-28B (PIT ' 01620) Starting Head Leak Repaired Page 1 of 2 Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator@bp.com] 4.eq 40/4 Sent: Wednesday, February 09, 2011 9:20 PM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Welipad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Engel, Harry R; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead;AK, RES GPB East Wells Opt Engr; Stone, Christopher;AK, OPS Well Pad DFT N2; AK, RES GPB West Wells Opt Engr Cc: AK, D&C Well Integrity Coordinator; King, Whitney; Quy, Tiffany; Vazir, Mehreen Subject: OPERABLE: Producer F-28B (PTD#2101620) Starting Head Leak Repaired All, Producer F-28B (PTD#2101620) had a leaking carbon fiber composite wrap that was completely removed, and a new composite wrap has been applied to the starting head to mitigate a small thread leak. The wrap has been pressure tested and there was no evidence of a continued leak at surface. The well has been reclassified as Operable. Note: A CTD sidetrack was completed in January, 2011 which is — why the PTD and well number has changed from the e-mail chain below. Please call if you have any questions. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907)659-5102 Cell (907)752-0755 Pager(907)659-5100 Ext. 1154 From: AK,D&C Well Integrity Coordinator Sent: Sunday,November 14,2010 11:07 PM To: 'Maunder,Thomas E(DOA);'Regg,James B(DOA)';"Schwartz,Guy(DOA';AK,OPS GC1 OSM;AK,OPS GC1 Field O&M TL;AK, OPS GC1 Wellpad Lead;AK,on Prod Controllers;Cismoski,Doug A;Engel,Harry R;AK,D&C Well Services Operations Team Lead;AK, D&C Wireline Operations Team Lead;AK,RES GPB Central Prod Opt Engr;AK,RES GPB East Wells Opt Engr;Kaminski,Alice;AK,OPS Well Pad DFT N2 Cc: AK,D&C Well Integrity Coordinator;Janowski,Carrie Subject: NOT OPERABLE: Producer F-28A(PTD#2040690)Confirmed Starting Head Leak All, Producer F-28A(PTD#2040690)was identified as having a confirmed starting head leak. The well was currently Under Evaluation for breaking MOASP on the IA on 10/27/2010. The well passed an MIT-IA on 11/12/2010 confirming the presence of two competent barriers. During the testing, the carbon fiber repair of the starting head was observed to be weeping fluid through the wrap. An MIT-OA to 1200 psi passed on 11/14/2010, but fluid was again confirmed seeping through the wrap. With an observed leak to surface, the well has been reclassified as NOT OPERABLE. The plan forward: 1. DHD: Remove existing carbon fiber wrap. 2. Furmanite: Re-apply carbon fiber wrap to starting head. Please call if you have questions or concerns. 2/10/2011 OPERABLE: Producer F-28B (PTD#''101620) Starting Head Leak Repaired Page 2 of 2 Thunk you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907)659-5102 Cell (907) 752-0755 Pager(907) 659-5100 Ext. 1154 From: AK, D&C Well Integrity Coordinator Sent: Saturday,October 30,2010 1:07 PM To: 'Maunder,Thomas E(DOA)'; 'Regg,James B(DOA)';"Schwartz,Guy(DOA';AK,OPS GC1 OSM;AK,OPS GC1 Field O&M TL;AK,OPS GC1 Wellpad Lead; AK,OPS Prod Controllers;Cismoski,Doug A; Engel, Harry R;AK,D&C Well Services Operations Team Lead;AK,D&C Wireline Operations Team Lead;AK,RES GPB Central Prod Opt Engr;AK,RES GPB East Wells Opt Engr; Kaminski,Alice;AK,OPS Well Pad DFT N2 Cc: AK,D&C Well Integrity Coordinator;Janowski,Carrie Subject: UNDER EVALUATION: Producer F-28A(PTD#2040690)Sustained IA Pressure Above MOASP All, Producer F-28A ((PTD#2040690) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing/IA/OA equal to 860/2060/80 on 10/27/2010. The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan forward: 1. Slickline: Install dummy gas lift valves 2. Fullbore: MIT-IA to 2500 psi 3. Electric line: Leak detect log (pending results of MIT-IA) A TIO plot and wellbore schematic have been included for reference. Please call if you have any questions or concerns. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907)659-5102 Cell (907) 752-0755 Pager(907) 659-5100 Ext. 1154 2/10/2011 _, , (,„ _ „ n‘\-,)lipri,,,\TIrLE OF [......dgEn Li i SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Field, PBU F-28B BP Exploration (Alaska), Inc. Permit No: 210-162 Surface Location: 2359' FSL, 2193' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 3832' FSL, 1403' FEL, SEC. 02, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. incerely, or Daniel T. Seamount, Jr. Chair DATED this S day of November, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED4‘ ALA OIL AND GAS CONSERVATION COMP ION //4G/0 PERMIT TO DRILL i'1IV 0 3 2010 20 AAC 25.005 Qj�j P r� !, sioit la.Type of work: lb.Proposed Well Class: kgkt Otcify irwe Itissproposaeo for ®Development Oil 0 Service-Wini 0 Single Zone ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalb + s Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG ❑Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU F-28B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11110' TVD 8988'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028280 2359'FSL,2193'FEL, SEC.02,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2896'FSL, 1293'FEL, SEC.02,T11N, R13E, UM December 3,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 3832'FSL, 1403'FEL,SEC.02,T11N, R13E, UM 2560 9580' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 66.70' feet 15.Distance to Nearest Well Open Surface: x- 652650 y-5973893 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 679' 16.Deviated Wells: Kickoff Depth: 9680 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 95 degrees Downhole: 3180 Surface: 2300 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 3" 2-3/8" 4.7# L-80 STL 1510' 9600' 9055' 11110' 8988'ss Uncemented.slotted liner 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 10819' 9049' 10062' 10782' 9051' None Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 8 cu vds Concrete 110' 110' Surface 2675' 13-3/8" 3274 cu ft Arctic Set III,465 cu ft Arctic Set II 2675' 2675' Intermediate Production 8593' 9-5/8" 575 co ft Class'G' 8593' 8457' Liner 754' 7" 374 co ft Class'G' 8321'-9075' 8209'-8898' Liner 2470' 3-1/2"x 3-3/16"x 2-7/8".146 cu ft Class'G' 8349'-10819' 8235'-9049' Perforation Depth MD(ft): 9770'-9924' Perforation Depth ND(ft): 9054'-9045' 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report IN Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoin is true and correct. Contact Amanda Rebol,564-5543 Printed Name John Title Engineering Team Leader Prepared By Name/Number Signature /.- Phone Se y.„7// Date (/ ��) Elizabeth Barker,564-4628 Commission Use Only Permit To Drid7 API Number: Permit Approval Date: See cover letter for Number: c2, /7 50-029-21649-02-00 1 1 (61 I other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: ffe 3 SO C.) (5 BC'/' r`—� Samples Req'd: ❑ sIB' Other: ` �No Mud Log Req'd: 0Yes e7 No 7�ZS"vd is.: nti D_ 5(,)HA Measures: lff Yes 0 No Directional Survey Req'd: EYes 0 No /1 I APPROVED BY THE COMMISSION `/ Date ,COMMISSIONER Form 10-401 Revis d 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate NAL ORIGI 0..S -0 )/ // • F-28B - Coiled Tubing Drilling To: Alaska Oil &Gas Conservation Commission From: Amanda Rebol bpCTD Engineer0 Date: October 26,2010 Re: F-28B Permit to Drill Application Approval is requested for a permit to drill a through-tubing CTD sidetrack from F-28A. This well will exit 3- 3/16" liner off a packer whipstock,kicking out in zone and drilling—1450' of horizontal wellbore, targeting reserves in Zone 1A. This sidetrack will effectively replace the high GOR parent wellbore and drain existing reserves in a—250 acre target in central F-Pad. Coil Tubing Sidetrack: Drill and Complete Summary Pre-Rig Work: (scheduled to begin November 17, 2010) 1. 0 MIT-IA 3000psi 2. 0 MIT-OA 2000psi 3. F PPOT-T/IA 4. C Drift for whipstock to 9,675' 5. W Check lock-down screws; torque to spec 6. V Set TWC,pressure test tree,pull TWC 7. 0 Remove wellhouse, level pad, remove flow line n 8. V Set TWC(within 24 hours of MIRU Nordic 1) Rig Work: (scheduled to begin on December 3, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. lelI( se.�- 1� m-. C,Llei ps(bc E 2. Mill 2.74" window at 9,660' through 3-3/16" liner 3. Drill Build: 3"OH,450' (35 deg/100 planned) 4. Drill Lateral: 3"OH, 1000' (12 deg/100 planned) -h5 5. Run 2-3/8" slotted liner, leaving TOL at 9,600' FrP 6. Freeze protect well, RDMO Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull TWC F-28B - Coiled Tubing Drilling Mud Program: • Well kill: 8.6 ppg seawater/brine • Milling/drilling: 8.6 ppg Power-vis Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind&Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3"9,660' - 11,110' MD Casing Program: • 2-3/8" 4.7#,L-80, STL slotted liner 9,600' — 11,110' MD Well Control: • BOP diagram is attached. • Pipe rams,blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 94 deg • Magnetic and inclination surveys will be taken every 30 ft.No gyro will be run • Distance to nearest property line—9580' • Distance to nearest well within pool—679' (F-04B;this point occurs as the planned F-28B trajectory is exiting the -- liner in the parent wellbore. Anticollision Summary • No anti-collision issues Logging • MWD directional and GR will be run over all of the open hole section. Hazards — • F-Pad is considered a high-level H2S pad.The maximum recorded H2S level on F-Pad is 160ppm on F-24 (4/15/2007). More recent readings on nearby surface and bottomhole locations are lower,in the 10-12ppm range, with the most recent parent wellbore reading at l0ppm on 5/12/2010. Take all necessary precautions while working on an H2S site. • Lost circulation risk is considered low;there are no fault crossings planned while drilling this well,and there are no significant lost circulation events in surrounding wellbores targeting the same zone. Even though there are no losses anticipated,always monitor for potential losses while drilling. Reservoir Pressure • Reservoir pressure is estimated to be 3,180 psi at 8,800'TVDss(6.95 ppg EMW). Maximum surface pressure with gas(0.10 psi/ft)to surface is 2,300 psi. Amanda Rebol CTD Engineer 564-5543 TREE= 4"CIW SAFETY NOTES: COMPOSITE WRAP REPAIR SH WELLHEAD= McEVOY ,..c )0 NOT PUMP METH OR METH BLEND INTO ACTUATOR= AXELSONF-28A OA..JE TO CHEM INCOMPATIBILITY W/EPDXY KB. ELEV= 66.7' RESIN IN WRAP BF. ELEV= 38' - KOP= 6700' Max Angle= 94 @ 9515' [ 2085' —14-1/2"OTIS SSSV NIP, ID=3.813" Datum MD= 9041' O Datum TVD= 8800'SS 13-3/8"CSG,72#, L-80,ID= 12.347" —I 2675' GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH SIZE DATE Minimum ID =2.380" @ 9678' 7 2978 2978 1 OTIS DOME RM 16 06/29/10 3-3/16" X 2-7/8" XO 6 4774 4774 0 OTIS SO RM 20 06/29/10 5 5903 5903 1 OTIS DMY RA 0 4 6639 6638 6 OTIS DMY RA 0 3 7180 7161 17 OTIS DMY RA 0 2 7758 7698 24 OTIS DMY RA 0 1 8140 8045 25 OTIS DMY RA 0 ITT 8208' —OTIS XA SLIDING SLV, ID= 3.813" f ] 8268' —TIW TBG SEAL ASSY Q+ X 8283' —9-5/8"TM!HHBP PKR, ID=4.750" 8288' —MILL OUT EXTENSION, ID=6.004" 8321' —7"BROWN SHORTY HYD. LNR HNGR I I 8325' —4-1/2"OTIS X NIP, ID=3.813" 8349' —3.7" BKR DEPLOYMENT SLV, ID=3.0" ' 8357' 14-1/2"OTIS XN NIP, MILLED ID=3.80" 1 I (BEHIND CT LNR) 4-1/2"TBG, 12.6#, L-80, .0152 bpf, ID=3.958" H 8390' I 8369' 3-1/2"HES X NIP, ID=2.813" 3-1/2"LNR,8.81#, L-80, .0087 bpf, ID=2.992" -I mo ' ��8401' I8390' �4-1/2"WLEG(BEHIND CT LNR)~ 9-5/8"CSG,47#, L-80, ID=8.681" -J 8591' A I\ 8401' —3-1/2"X 3-3/16"XO, ID=2.786" ••'• � 8845' —I ESTIMATED CEMENT TOP TOP OF WHIPSTOCK 9069' ��� , 4 _ 7"LNR,26#, L-80, .0383 bpf, ID=6.276" - 9073' •i ,•� TOP OF WINDOW(F-28A): 9073' / PERFORATION SUMMARY REF LOG: 9678' —13-3/16"X 2-7/8"XO, ID=2.380" ANGLE AT TOP PERF: 95°@ 9770' 10062' H 2-7/8"CIBP(03/21/10) Note: Refer to Production DB for historical perf data ` SIZE SPF INTERVAL Opn/Sqz DATE • 2" 6 9770-9800 0 03/21/10 v 10782' H PBTD I 2" 6 9812-9842 0 03/21/10 2" 6 9894-9924 0 03/21/10 2" 6 10080- 10300 C 05/22/04 3-3/16"LNR,6.2#, L-80, .0076 bpf, ID=2.80" 9678' 2" 6 10350- 10520 C 05/22/04 2" 6 10640- 10770 C 05/22/04 2-7/8"LNR,6.4#, L-80, .0058 bpf, ID=2.441" —I 10819' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/86 ORIGINAL COMPLETION 03/22/10 SV GLV ND CORRECTIONS WELL: F-28A 05/22/04 KAK CTD SIDETRACK(F-28A) 06/29/10 JLJ/PJC GLV C/O(06/29/10) PERMIT No: 2040690 06/01/04 RMH/KAK GLV C/O 09/23/10 PJC SAFETY NOTE UPDATE API No: 50-029-21649-01 12/08/09 ?/PJC SET PX PLUG(11/18/09) SEC 2,T11 N,R13E,2359'FSL&2194'FEL 03/02/10 SEW/RPC PX PLUG PULLED(02/14/10) 03/22/10 ACB/SV SET CIBP/ADPERF(03/21/10) BP Exploration (Alaska) TREE= 4"CNV SAFETY NOTES: COMPOSITE WRAP REPAIR SH WELLHEAD= McEVOY 2 LI TD NOT PUMP METH OR METH BLEND INTO ACTUATOR= AXELSON OA—JE TO CHEM INCOMPATIBILITY W/EPDXY KB.ELEV= 66.7' Proposed CTD Sidetrack RESIN IN WRAP BF. ELEV= 38' KOP= 6700' Max Angle= 94 9515' 2085' 14-1/2"OTIS SSSV NIP, ID=3.813" Datum MD= 9041' O Datum TVD= 8800'SS 13-3/8"CSG,72#, L-80, ID=12.347 1 2675' GAS LIFT MANDRELS ST MDND DEV TYPE VLV LATCH SIZE DATE Minimum ID = 2.786" 8401' ' I 7 2978 `2978 1 OTIS DOME RM 16 06/29/10 3-1/2" X 3-3/16" XO 4 6 4774 4774 0 OTIS SO RM 20 06/29/10 5 5903 5903 1 OTIS DMY RA 0 4 6639 6638 6 OTIS DMY RA 0 3 7180 7161 17 OTIS DMY RA 0 2 7758 7698 24 OTIS DMY RA 0 1 8140 8045 25 011S DMY RA 0 I 1 1 1 I 8208' --I O11S XA SLIDING SLV,ID= 3.813" \ 8268' -JTM/TBG SEAL ASSY I ., 8283' H9-5/8"TNV HHBP PKR, ID=4.750" 8288' H MILL OUT EXTENSION,ID=6.004" 8321' 17"BROWN SHORTY HYD. LNR HNGR ' ' 8325' 14-1/2"OTIS X NP, ID=3.813" I 8349' IH 3.T BKR DEPLOYMENT SLV,ID=3.0" 8357' 4-1/2"OTIS XN NIP, MILLED ID=3.80" 8 3 I(BEHIND CT LNR) 4-1/2"TBG,12.6#,L-80, .0152 bpf,ID=3.958" H 8390' ill' 8369' 13-1/2' HES X NIP,ID=2.813" 3-1/2"LNR,8.81#,L-80,.0087 bpf, ID=2.992" H 8401' 1--------1—\ 8390' --I4-1/2"WLEG(BEHIND CT LNR) 9-5/8"CSG,47#,L-80, ID=8.681" 11 8591' • 8401' H3-1/2"X 3-3/16"XO, ID=2.786" •j• j a. ID 0 0 CO 1 a 0 J cx Qa) Ct CC CD 0 C .... .. L. E o QMIMI tC NN o N Oil a m a U �i 0 imNN co 0. O mho Z aau. u_ a CO N m � N z co co co O 0 0 C O co m co co O O h CI C C O N O O to O O O N O O O O M O O O) O6 a) a) O O O O -ccP t; O V M (�) c0 00 a) a) m 4f i i i U U I 00 a 0 CO C C H v M 0 0) 0 O O O O O '.. a) U) co co U) CO N. a) n N (0 a) a) co CO CD a) N. r` a) 0 a) (.1 W a) a Q O O V V N O °) C) N M CO M M CO O N Q. cci ca a_ c0 oo oo I,. r CO a) a) CD CD a) U) U) �� _ O N N N N N N N N CO M CO V U) 0 00 y= U 0 0 0 ° o ); N CO CO U d (p ° co co Z co o 0 0 0 0 0 0 0 0 0 0 - rn rn L. Q c) U) o 0 o 0 o 0 o 0 0 0 0 0 ai tri ai Ui Lei tri tri Lei tri tri tri tri CC) co 01 a) E M CO CO CO M CO CO M M M N E (0 a) LL N N O c m J O N N F 0.... d co 7 N CO ,- N- N U) U) a) M CO a) U ii N- co co — a) co .— co a) N- N O 0 O c) V V V N O C7N M V• tri a) CD V CO co 0 O co a) a)) co CO 1� N y w 01 W cO N a) co a) a) co 0 O O O O O co co co co co co co in co co ln in d a) 7.0 C) M coM M M M C) 7 .4 a)2 W-- O O O CO CO CO CD CO (O CO CO (O (O 0 O L W C 0) U !{ co O V E U) CO N V N V V N 0 CO N CO 7 9 ` yd., R ° a) N. a) c0 O co co 7 — a) O CO r— O 0 0) O Q N c0 c0 W d) W N t` O O M N U) V O) .- Q' T 10 co 0) O 0 0 0 M M O V 0 a) Ce dTi re L d .Q 0 M co co co co co co co V V .1- U) U) F- Z c O O m m o CDa> rn 0) 0) C3) a0) 0) CS)o) ) a) 0 m 0 -0 ' z tri tri N. N- co Ui t17 U') tri t17 In tri co- tri It1 'C o , „° 9 a Q � � cn CC '� co V N CO (O U) a) N N- V '1' 0 N U O 0 0 O O O 7 N CO CO N V N 0 CD N N N M ,_ c0 N- M V U) CO V 0) d> > 0 N V CD N- V U) N N M M a) �. 0 (n 22 N N N N N CO M CO y V V M CO D < F- d 'o CO U o co co _ co 0 _ _ a 0 V O N N N O) N CO U) U) CO c1:1 N O N Cp N (O N- a) O CO d' Q) E >' co co a) a) a) a) co O N co N co (5 0 co co co M co M V V V V co co Co co Z ch D D co C 0 o O f- m 2 2 (O O co I,- a) co O co co (0 CO CO cp co co a0 a) a) a) co to V N O 0 0 N O O M1.0 a) Cb r a) a) N Cb Cb a) a) a) a) a) a) a) a) co co co co co Co a) a) a) a) a) a) a) a) a) a) O) a) a) Co O o6 o6 Cb coCb Cb W cO Cb O co" co- GI 0= E O T O cn N CO CO (O O O CO CO CO co co (n a) r` r` N CD CO C` T a) N CO W O N O O co M CO M O U) U) cei O U) O co (3) a) a) co co N Co CO N N M M -a C m m O T, (n7 oaD co w csi N y 0.>Q N O > N a) O 0 U) O (° 0 2° 0 0 0 Q Co v a V N V O O N co co O O O m 0 CO 0) r- 0 co co o v v v v o 0 0 CO O co a) CO CO CO N CO t` Q) a) a) O O Q) Q) O U T c0 m 0 Off^.. O (D Co 0 Q O 0 1-- O O 7 O N "a CO C 10 Z O m m <N N N mQ. Z a. o. LL LL E. a) 0 0 a) N rn 0 o O co o co co o co o r 0 0 0 . d m M 0 0 a, 0 0 co, a) 0 co O oo 0 0 O CO tO O O w O O O f` O M O O N 7 CO GO O O Tr N- co 0 a) 0 co O O 1� O O CO 7 co (O d CD t` N- t` r` co co a) a) co N \\i c y H o °) °) 0 ai O CO' 0 ai ai ai ai ai ai ai ai ai o 0 0 'mg a o n ami LL r Y w a v) (o r• co N m N o 0:: d d N 7 to N 7� c� am3 � 0 Co a o CO c 0 0 0 0 0 0 0 0 0 0 N.. Q r r O o o O co O O o 0 0 o a 0 0 0 0 0 0 0 0 0 0 0 0 0 S7rn a) a) m CO a) a) rn rn rn 0) a) 0) m -Z o 13 a) 0 U .0 lL°. C cocti CD O) O) O N = 03 0 0 U) 1- N 0 0 N V V CO (O 1- N- 03 a 0 U) M N O CO CO V N CO U) V N Q O CO V W 6 6) O 00 co (O (O U) Ni 6) co 0- N U) N 0 CO CO U) V N CO 0 CO O rat© _ 0 U) CO N.- CO CO 6) O N N CO M M Q 0 e r r r r r r r V 0 0 0 0 0 N 0 > N (O (O 6 a .5 ,— Q1 z ZO O O co O O O 0 O O O O O W 7 Q O O O co O O O O O 0 O O 0 0 U) Ni Ni Ni Ni NN Ni Ni Ni Ni Ni Ni co -as E co co r r r r r r r r r r r r co co7 r- O) LL N N E JOG O NNH2 WW °-- 4) N. co co N U) N- V O N 6) V 0 CO o .i U) 00 O 6) U) r N M 6) r N- M CO CO N O 1-, V U) (O M O O M co Ni N. .0CV CD CD LO- O) O 6) 6) 00 CO N- CO CO LU U) 'Cr 7 "Cr w 0 C CO CO M CO M CO M CO CO M M M 0 r2 H vU) U) U) (U (n U) U) U) U) in (n 1n (n CO CO CO CO O O CO CO CO CO O CO CO C la d O W d .— u U d C 3 C C 6. U U) O N CO CO U) CO CO of 00 O N O 9 .. � d w Id U) co V O N- U) I� U) CO et CO O 0 N w d' T R O] o ((0 (N COC0 CO0CD1-V N N m CO IX r2 t 0 . C CO O t` CO 6) 0) O r N N N CO CO p 0 0 O R CD tri N N t.6 N- N- J 2 fq D O O) 6) O O 6) O 6) m 6) m m O 6) Z U) U) U) U) U) U) U) U) U) U) U) U) U) t Ce 0 li/ M 6) co W N- N- O U) U) U) O N O co6) O 6) N- CON O COCO 0 O O U) M O co O U) N O N- Ni 1` N N 1� N U) CO CO 00 V CO CO Q. CO M N N O 0 O O O CO 1- 1•••••cn CO li 1 � r r r r r < I . coam UN 0 00 7 O N O N N 7 0 et a U) O N- M U) I� M O N O O e)• mW M Q) N U) 1- 0 O O V M m OT) V co co O U) co co co N. of CO N- CO 6) 6) O r NM CO CO V V' CO Zv r r r r r r r r CO CO (.0 CO CO O CO CO CO CO CO O CO 0 0 0 0 0 0 0 0 0 0 0 0 O O O O W O O O O O 6 00 00 00 co co co O co co co co co co co co co U) rn a) rn CD rn 0) CO CD rn rn 0) 0) 0) G0 00 0 0 0 co- C) 03 0 6 00 0 >-.. M CO CO M CO CO CO CO CO CO CO CO CO CO .,-. .,-: ,-- ,- ,-- ,-. <- ,-• a) h 1- 01 N M U) M M U) M 6) O Ni M N M N N CO N O N CO CO CO CO CO CO CO CO CO CO CO M CO CO CO Y I J O O O co O O O O co O O O 0 Q O O O co O O O O O O 0 0 0 m U)0 0 m W 0 60) a) W 0 m CO060cis ) J U N V O QE O C v 0 a N U 2 m CO N N N Z 0 0 U U E. 0 N 0 0 0 0 0 0 0 0 0 0 0 O p d O M co O O O O co co co o O co O II Cit O w O O O O O O O O O 0 0 O N O O 0 0 O O O O O O co N Al 7 r .O N M V U) co 1- O Cr) 0) O ; c ` n O o Wo 0 00 0 � o o � 0 0 0 �r r r o � « O c mr o CV m d p 0 w d N d (6 N 7� c) am33c a o a W MN - 1NI; S m - = W - H o o Z n m o E. L ry n V ,ar m ' II i 1 g 11 0 'Nen — m • n y o ��� ." o, a 2a--ad - R' `�``\ O y g -'g�3 w A r, 0 1 N / C.V. N W/ _ O Gio h � P O ppm _-. _. _ I _�_... .._ NN _ /\ n Q yy O ww m o $ 8 O^ n s s 3 8 0 z o "n o o V7 0 3 N N N N (fit/►3 6)(+�i[uSN/(74un6S _ _ _ _ _ a M m m r- w am C Hgog �$ er C4 'R S arn rn y m VU+ o N 13 m^mw.._� n �- pr -Y W O m 8 Nm 3 1 c 8 0 g 2A >*NNN.Nnm� LSAM G or N Nh 07_ 1 < §8288888880 O W N O r -g tgn 6si La mil. NNN N h 2 2m N' N 7 p a1www a2 08288888888 QT :: `N ;-7.:'11 O�_ nnmmnn 0iNNN m C h ON3ad H a o 2rn$3o 2 $ v 1. 9m m$ _ I a F _ r NNN h.,nNNNN 0 m W 0c3,1cc2S7,o mr S m gqU ^^^�r ^mNNNoAm go ^ F N u. m o •m 2.00o»mmg888m ` * tem00000000= -- - N ,^n O ia ^m E';',88fe: 0 O �8�888 888$ A wm 0A888888."5888886 0 0 v S + N 0 �A§EigEag0000a_ p. r. 3^ ianai eag aeon1.---,........----- (14B 5£)MdaQ L ie3910A atu I MIig_ CO W N as a I1L iC.,... A en r - • I OS m m LL.i .j E N z 3 m,7'10 J 1 55 c 0 ,g 0. VttI N 1 , r,.; .n R ' o VI r n. Noo en O co N0 .70 Z 0 t1 4r. 01 _I ___._ o J m LL rn / I41 _ o en in 01P 'g E Lil 3 0006 -1 N. CO '.900 ill 7±. = ° I-- _1 a +y. Alm = y ciio Ca ill , Ill, v§ , 1 IL \ 004.. 9 ` iha,..".",---- 2.4 . a .... 811 w �§ a , [4 r. w • 11111101111 , 0 El )111616. -- dill 4 III 10,,,. -..„ 1061 _ le ....„,,, kr di° 0 OE _ (UPJ SL)(+)quoN/(-)1Ilnos 8 8 a, a BPPASSPORT s N GHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: 29:28 9/19/1986 00:00 @ 66.70ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: F-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore F-28B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 2 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB F Pad F-01 -F-01A-F-01A Out of range F-01 -F-01APB1 -F-01A wp08 Out of range F-01 -F-01APB1 -F-01APB1 Out of range F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-04-F-04-F-04 Out of range F-04-F-04A-F-04A Out of range F-04-F-04APB1 -F-04APB1 Out of range F-04-F-04B-F-04B 9,890.00 11,681.00 616.84 223.03 397.46 Pass-Major Risk F-04_DO NOT USE-F-04-F-04 Out of range F-04_DO NOT USE-F-04A-F-04A Out of range F-04_DO NOT USE-F-04APB1 -F-04APB1 Out of range F-04_DO NOT USE-Plan 3,F-04B-Plan 3 9,930.00 11,502.23 547.38 188.39 362.12 Pass-Major Risk F-05-F-05-F-05 Out of range F-05-F-05A-F-05A Out of range F-10-F-10-F-10 Out of range F-10-F-10A-F-10A Out of range F-10-F-10B-F-10B 9,650.00 10,950.00 551.05 503.02 55.34 Pass-Major Risk F-11 -F-11 -F-11 10,875.00 9,425.00 665.95 186.77 482.23 Pass-Major Risk F-11 -F-11A-F-11A 10,883.21 9,300.00 671.44 191.39 489.49 Pass-Major Risk F-11 -F-11 B-F-11 B 11,110.00 10,675.00 441.55 133.35 309.59 Pass-Major Risk F-11 -Plan F-11 C-Plan#6 F-11 C 10,900.00 9,225.00 510.66 192.43 339.78 Pass-Major Risk F-13A-F-13A-F-13A 10,991.17 10,320.00 1,109.46 187.06 927.72 Pass-Major Risk F-18-deleted me Plan F-18A-Plan#7 F-18A Out of range F-18-F-18-F-18 Out of range F-18-F-18A-F-18A Out of range F-18_DIMS-F-18-F-18 Out of range F-18_DIMS-F-18A-F-18A Out of range F-19-F-19-F-19 Out of range F-19-F-19A-F-19A Out of range F-19_DIMS-F-19-F-19 Out of range F-19_DIMS-F-19A-F-19A Out of range F-27-F-27-F-27 Out of range F-27-F-27A-F-27A Out of range F-27-F-27B-Plan 3 Out of range F-27_DIMS-F-27-F-27 Out of range F-27_DIMS-F-27-F-27 Out of range F-28-F-28A-F-28A 9,674.99 9,675.00 0.40 1.06 -0.54 FAIL-Major Risk F-28_DIMS-F-28-F-28 Out of range F-28_DIMS-F-28A-F-28A Out of range F-45-F-45B-F-45B Out of range F-45_DIMS-F-45-F-45 Out of range F-45_DIMS-F-45A-F-45A Out of range F-45_DIMS-F-45B-F-45B Out of range F-45_DIMS-F-45BPB1 -F-45BPB1 Out of range F-46_DIMS-F-46-F-46 Out of range F-46_DIMS-F-46A-F-46A Out of range F-47-F-47-F-47 9,760.00 9,200.00 842.18 197.20 661.25 Pass-Major Risk F-47-F-47A-F-47A 9,760.00 9,200.00 842.18 197.20 661.25 Pass-Major Risk F-47-F-47B-F-47B 9,760.00 9,200.00 842.18 197.20 661.25 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/29/2010 2:10:42PM Page 3 of 21 COMPASS 2003.16 Build 73 i 1!1 L. U NIV N Y~ -III 4y 1> m •II 0 n a` II/ a f 0 2 8 0 N oo O I U 3 Y . v I1' Y �•� 2 II IIIIIII • n , o L 1 1 11 +all ` C :EiiJ a' sn _ _ � a —.■ II II 4s G II7''' 12 m U$ � 1 1 U ! Q3 p : CC ig 193 8^ I ; Qa — I 4 U CI I IIIc Cl I ILII : ! w J I IIID.:. INN Q I U. z _g I II ., II U I 3 m Z n LL b ®a] 020 ICM u IIIIII 5 c I 5P. J J I Q m I €0 H ' jr,01.11 Q Ig E — i1 e '0 IIIIII o.. �3 II U ic I sA U U • /r > `'✓l, 1 • rum LUL • , ■ C 1111 I ID Y F` o IPS �,.,1 III I 3 W M IIIIII U 01 IIII • 0 I Ofd ! Y 11 I11 'T, i 124 0. U U " r T 0 g ISM � illIIIMIF 11M11117 Ail _ Q I Hill U .U A I 10 I I CC 3 I 1 mu Z g Ia. IHII I 0 Inim dui 1'I' a C I'1 1 1111 . dul ii11 al in 01 c711 c Iumiii 1 1 1 0 1w I• 111,1' III l 1- o I 8 ' iFF=1i'I11, 1 Page 1 of 1 Schwartz, Guy L (DOA) From: Rebol, Amanda[reboa2@BP.corn] Sent: Friday, November 05, 2010 9:41 AM To: Schwartz, Guy L(DOA) Subject: Re: F-28A P &A( PTD -204-069) Guy- Due to deviation at the whipstock set depth,we'll be doing it with the rig. It'll be our first operation once we're over the well. F-27B will be doing the same. Thanks -Amanda On Nov 5, 2010, at 9:21 AM, "Schwartz, Guy L\(DOA\)" <guy.schwartz@alaska.gov>wrote: Amanda, In reviewing the procedure for F-28A I don't see a step for setting the whipstock . Is E-line setting it or Coil pre rig?? Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 11/5/2010 Alaska Department of Natural "-sources Land Administration System Page 1 of(2/ Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28280 8 Printable Case File Summary See Township, Range, Section and Acreage? ® Yes 0 No ( New Search LAS Menu I Case Abstract I Case Detail I Land Abstract 411, File: ADL 28280 '''-4 Search for Status Plat Updates As of 11/04/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 11 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 12 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-91 TIIN, R13E, UM 1, 2, 11, 12 2,560.00 07-07-1987 ***LISBURNE PARTICIPATING AREA DESCRIPTION*** T. 11 N., R.13 E., U.M. SECTION 1:ALL 640 ACRES SECTION 12:ALL 640 ACRES http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=2828... 11/4/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME r ,L:r8 ,:wrz- PTD# 2A2/6. 1/ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: �.47C/D,4/D6- / POOL: '7 ' M't ,3 4/ 04 Circle Appropriate Letter I Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name)must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 N m o NQ N o Q : , , , , , , , , , , , , , , , , . , , , , , : ' , ; , W 0 , ; , o" Q . o. E. 6 U , , . , , , , , E o , o v, E 4 . O' a > °i 3' l[ a '' v LL, m a u_ , a) a). O, O) O N o. H N m N c o. --mo . E z a) io a � m 4 D c0 , 3 y Z o. �, , O m � <, O .:7. ....,o. 6, .y a0 o ,- co cn W Q .c N; 7. 0' Y a) m' a m' ' c m p a° -o, LL M 4 o E a 00, y S a) Q, LL -' N, 0, y, O, a M, .0., u). - , I co co �I 00) V N, c o Q) . a)� L 0� m� L - � L. p. ce a° rn E w' a)' cO' 3' a w §, 0) 1I U N' a) O) O .c 0' 1) 0' C Q. m O, c, N, U, c. C, (5, 'y, U a �� 0, 2 a*, 0) 0) '73, a,, 3, Y, >, l6, U, U, v, y •c c 4 •o, U m, 4 C 4 a E m m' o. C.) 0 0 c, 0. " , z 1 Y 7. U, U, 0, , 6 M, E, L 0 a� o � m a) o O' 7 O, rn O, a, (x6. Q. N w ad . C) w u) a' u> r 7 a 3' M. M. I ,„_CO Q, a), a), a',, 0' a) a), a), a), m, a) a), , a) Q, Q. Q,, Q ¢ < Q Q 0, aa) ) , a), a), Q, a), a), a). a) a), a), Q o Q ¢, Q Q, IN a z >-, >-, r, > r, }, > >-, >- >-. >, >, z, z, z z ;z, z z z, z, >- }, r, >-, z, r, >-, >-, >-. >, >, z z z, z, z, z, E , , .c , : E . , , . E. • a . . , , . ., Id Oa I.0 1 �. T U et U C _ IL t6CT, l'i m. y. Q CN a a) o, p. y� x 0 `N' a _0 0 ° Q 0 U o, C. 0 CM �, ami al o o 1 re m _ 0 w o ozs b `� m' a) III o T c 4 I a a; 3. o, 16, p. aci o �', y; N c o. a ', �' a a y, 11 Q , �, C, m ' m. 3 r, p 4 0 7, o. a m v, g Q' �, 0) co Z L' p) `, m a N 7, 3, ,_, 0. 1(!), �, 0) .0 °5 c m, 5, '=, O, �, �, Q' of N' N' o W - � V, 0, c' V' O, y, •C, •O, (6. a), a �, � 0, o, c, a) m 0, 0, 9) �' L c, c. C Q = al, C C, C. O `Gj, �S Y, �' N 'L' 1' N' _E3, N' L a O C E, E, v, c, C E a) O c N), C a), C = Q O O •O 7 p' 'c, 16, C ln' 3 O U .� 16 U c O 0D N w' y T O p Y NI, c, o' C, U' 0 a), Iii 0 O, Q, C cl) O 3 (j N. c 0 ._ - I•D,' d 0 3 Oo' >' /6 y N N 0 < a O N' a)' c' 0 7 7 w' •O a) w0; Y '., 0, o 0 o O m m 0,, Q, N' 4. (n, '0. o, p) o, 0,, a) E o: 0, U, o' -E, .o' O O' m, C a) m, m, a o, Z E, E 3 a) o m' L' T' 3 w O, • a Q m, c, v ,cm_„ O, m 0, 0. ui w « -, m' m; a, E, ami, m c, c °:' co u0,, M; m. :0,, t, ac') c 0,oy o a 3' o c �' >, 3 c E o z , a v' c, 5, g a) .o, w. 3 3 >, a), - .. p 5 ° '" .°-.), o' -' -' v' m o' ul a 1 c' �, 0 3 0, L: Z 0 w U a . o . m, `o. 'v m; a c o ate) a�f 2' m E' 0 c o. 0 0 2 Y, a6) o o; 0 v E am) f6' E t �) o ate) a w' 0 c ~ C)' a N' N' N ,n 0 a a c 8 a o .0+ .0.. - - 0 'O m E O) o (n' :.. 7' c' O O 0l5 Q L a N, a a 5 N t-, a u) y. a L' a), a m. 0, m' O N O) C. U N. = N 0 rn c L. : -0 a' U a, E. O, O. 4 N, 0 l6 . C N. O) m @ CO,16T . M,, .N 0, _a m' 3' m' a3 a) c' 7 7' V) m In .D' O a) co -0 c •0' 'V) I LL O m L C' "O' "O 'O, CT N T 03 L, L, L. -0, L, N, . n' C a) 0,, >, 2) C L, 0� 0 a L V), E U 0 U -O `C T 0 a o E a) m, m w m, -6 o r c, c, - W, • 1), c o -o •o c, 0, :°', , 3, ,- .- 0 0 c o c m c aca CO o m, x m 3' m o o m m a)' m - a),, ,- m -o m m 7, 3, m, is m. �, m �, E. m, v' = c . H w c () o v o o 0 U 0' �' ) d E U , CO 1) c co o' o, o, o. d m, _, a) o 0 C o o' > >' 3' rn c o, COc r m uS, 3. �, @ _, a m a Q N -' N N. a`m), € C C 3 N G c. `m0 H H H, y, N N, N > C d d, O a U C m 0 0' C, m m, a), c 7, •0 4 4 m m m, o, o. 7. 2 .z', 2 m -o m •o, `o -c, O, O, L, m m m 0,, O, o ' o U c a, -J, D �' �' �n, Q Q, a; a; U, �' a; a; z, 'c.), (n O U, U; p Q w a w, o, m, m, U �' N 2', a; o cn (n, U', a) O• O - N co •7 11) co N- co 0) 0 r- N CO ' )n CO 1- CO 0) 0 '- N CO O CO I.- OO 0) E N M LL') co N- cc. 0) - _ ._ N N N N N N N N N N CO M CO co M co M 1'') M M U O O 0-.r,. O N d cc;), r N ads N U c O C iO co as O ce N O 0 v p p v 5)in UJ o 'R - C - - o rn CL o .`„ - 0 E N QOJ N a) O JC aU C a O U o $ 6 a U Q aaa Q L Vv'ell History File AR• END1X Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 11/04/26 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 11/01/08 3573574 01 2.375" CTK *** LIS COMMENT RECORD *** IIII ! ! 1111 IIIIIII Remark File Version 1.000 Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8601.5000: Starting Depth STOP.FT 11130.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: F-28B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 20' 8.377"N 148 deg 45' 41.338"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 08 Jan 2011 API . API NUMBER: 500292164902 Parameter Information Block #MNEM.UNIT Value Description SECT. 02 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . KB Log Measured from FAPD.F 66.70 Feet Above Perm. Datum DMF . KB Drilling Measured From EKB .F 66.70 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 cgi()—(Ca- 1410341 tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and • a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL above the Kick off Point 9660 feet MD dated 22 May 2004 per waiter Tifental with BP Exploration (Alaska) , Inc. The MWD data is now the PDCL for well F-28B. (8) The sidetrack was drilled from F-28A through a milled window in a 3 1/2 inch liner. Top of window 9660 ft.MD (8990.8 ft.TVDSS) Bottom of window 9665 ft.MD (8991.0 ft.TVDSS) (9) Tied to F-28A at 9645 feet MD (8990.3 feet TVDSS) . (10) The interval from 11108 ft to 11130 ft MD (8988.7 ft. to 8988.7 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8609.17, 8608. 56, ! -0.616211 8610.81, 8611.22, ! 0.411133 8614.71, 8614.71, ! 0 8618.2, 8616.97, ! -1.23145 8619.43, 8619.23, ! -0.205078 8625.39, 8623.95, ! -1.43652 8626.82, 8626, ! -0.820312 8630.93, 8629.9, ! -1.02637 8633.19, 8631.96, ! -1.23145 8649.84, 8646.77, ! -3.07812 8654. 57, 8652.51, ! -2.05273 8670.37, 8669.75, ! -0.615234 8678.79, 8677.76, ! -1.02637 8683.3, 8681.66, ! -1.64258 8687.82, 8685.76, ! -2.05273 8692. 54, 8691.31, ! -1.23145 8694.18, 8693.15, ! -1.02637 8696.85, 8695.82, ! -1.02637 8702.6, 8701.57, ! -1.02637 8709.16, 8707.73, ! -1.43652 8713.19, 8712.37, ! -0.821289 8718.11, 8716.68, ! -1.43652 8721.6, 8719.96, ! -1.6416 8724.48, 8723.45, ! -1.02637 8728.17, 8726.32, ! -1.84668 8732.48, 8731.25, ! -1.23145 8735.15, 8734.53, ! -0.615234 8739.87, 8738.84, ! -1.02539 8745.41, 8743.77, ! -1.6416 Page 2 tapescan.txt 8751.16, 8750.13, ! -1.02637 8752.8, 8752.39, ! -0.411133 8757.32, 8757.73, ! 0.410156 8760.39, 8760.39, ! 0 9658.86, 9659.07, ! 0.206055 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 105 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** IIIIIIIIIIIIIIIIIII Remark File Version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL above the Kick Off Point of 9660 feet MD dated 22 May 2004 per waiter Tifental with BP Exploration (Alaska) , Inc. The MWD data is now the PDCL for well F-28B. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 Page 3 tapescan.txt 8 Total Data Records: 61 Tape File Start Depth = 8601. 500000 Tape File End Depth = 11130.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 70 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** IIIIIliii , , IIItIllI Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples units size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 121 Page 4 tapescan.txt Tape File Start Depth = 8602.000000 Tape File End Depth = 11130.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 3 130 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 11/01/08 3573574 01 **** REEL TRAILER **** MWD 11/04/26 BHI 01 Tape subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8601. 5000 -999.2500 -999.2500 8602.0000 71. 5125 -999.2500 11130.0000 -999.2500 -999.2500 Tape File Start Depth = 8601.500000 Tape File End Depth = 11130.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape Subfile 3 is type: LIS Page 5 f tapescan.txt DEPTH GR ROP 8602.0000 -999.2500 -999.2500 8602.2500 71.4000 -999.2500 11130.0000 -999.2500 -999.2500 Tape File start Depth = 8602.000000 Tape File End Depth = 11130.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 6 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format.