Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout211-025 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. C, f I _ - ()QS Well History File Identifier Organizing (done) ❑ Two-sided II II' 111111111 ❑ Rescan Needed III 1111111 I 111111 RE AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: Other, No/Type:C. NO.1 ter Items Scannable by a Large Scanner toff rj ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: dap Date: A /s/ IMP Project Proofing 111111111111111 BY: Allan Date: flicttil i if /s/ (}'J P Scanning Preparation LI- x 30 =___,L2L) + = TOTAL PAGES Jc 0 (Count does not include cover sheet)vil BY: CMaria> Date: Watfillf. /s! Production Scanning III 111111IIIII 11111 Stage 1 Page Count from Scanned File: _LaL (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: CM Date: Cr p[jam /, . /s/ 1114P / 0"7 `'7 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III IIII II I II II 11 III ReScanned 1111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked II 11111111 111III o 6 o 9 .(-6 d 0F°- I-- ('7 U O c m m n o 0 jO. N co > > O a m 0. 0. o Z j 0 coo m m J J (0 m 0 u ca 0. coU Cl- a •C -�O.V,CI N : C n-U dUO COcf)J C C . co 0 `O. E JCL -.1 X- Ce t J.0•o E E i° E UO UO 0 2 1 m U U a 0: ci co O O Owgo E E E E p E E 0 H Ua V �H co 2 2 O> cO u N c a m o m 0 0 > a a) o 0 O. O. O. O. O. 0 0 0 0 00 O NN NNNNNN N N N 0 D b 1 O a' - CO CO to ti) V V N N Z CO J Ito 4) iii n n I:: Lo (f) E -- C To c - m a a a a a a 0. CO CO OU U U 0 0 0 0 0 0 O D U 0 Y Ce a cI U O O co co) 0o O 0) 0N-) 0 0 O m a co ao rn rn co) rn rn rn co 0o COZ m S v v (n (n (n m u� (n Zr) O 0 III 1 o o N Op o o a s a '° W I C t O O C) M O O 0) 0) O O N Z /Y�/� O 4.4 M M O O O N- (NNO (O (0 (0 CO a co m rn a) m 0) m 0) 0) K 13 W w 0 _.1 1 U > a O 11 m m 0 Z = 0II re ca re z J e. m O U o �t 0 0 0 0 0 CL N c 1 ZI J 2 U U U U U n C o G• N ) N y C- 0) m IE U) CO0 as (/) 4:t N C4 I Z 0 r o 2 0. 0 H z o 0 ToCO EC • N >- CO I 0 W m c O - p O CD . (i) xCn m 0IX CO 0 i LL 1 CCQ a O l a) Q Z E ZI Io I > >. O O d U 0 . 0 Z Z C @ f0 c c 0 7 co v 1 2 c c (o Cl) m m m m m TO To Z Cl)0 m w w d E amici a) C E E E E-c- oommaim a) ac) m M Eo U C > o E E ,- E E E E E E 0 O j 0. Z N 0) N co (6 07 (n o N w H 0 0 O O C7 O O C7 J U U 10 0) 0 0 Z O y d 0) co O) (+) C CO CO N o F- I H N d R , ,- -o-N- C Q Z w p W O z N 2 O m N I E F O R « d O o 0) tL v E 3 E v, u `� E E o co 1 - ° �� a ¢ \ a co z .2 N I w p N C a m.. d 1 w W 1 — Z l!J \ \ U O E D Q )n \ 1 �\ U d - d m m m m m - y O w Q a d m a 0 0 O a o 0 o 0 a o O d a 2 I,1 ' 0 F- s J 0 F- J W W J J J W d' J W 0 o J M O n N N Z O N N 0 o -. i i Z° mow a I. a co U D Z CO Y j 76 co o Et a O z o 0 z z a P � v LI QE L NUo CO 1 J U QN L� O I."' I- E _ 1 5 O GN >- co CO m o CO I -cis 0 Q ao I .� Q o n 1:3 Zo E U ; i m Z . N 3M o rn Z co .. in N Z Z m I TJ CT; O al Z v aa) N a' V O C Z 7:1 a7 U I C C wO o LI) a) a) a) C U N .? ' E 1 o C a QaQ �a 3 0 Qcc 0 U RECEIVED STATE OF ALASKA JAN 18 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION ^OG�C WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: 0 Oil 0 Gas 0 SPLUG ❑Other ®Abandoned 0 Suspended lb. Well Class - 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions_.Zero • ®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,o<Aband.j 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 12/28/2012 • ,.,;x•17 211-025 • 312-283 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 4/9/2011 50-029-20277-03-00 • 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 4/17/2011 PBU 02-12C ' 804'FNL, 894'FWL, SEC.36,T11N, R14E, UM 8. KB(ft above MSL): 56 15.Field/Pool(s) Top of Productive Horizon: 4120'FNL,3435'FWL, SEC.36,T11N, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay • Total Depth: 9.Plug Back Depth(MD+TVD) Oil Pool 4621'FNL, 74'FWL, SEC.31,T11N, R15E, UM 8511' 7418' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 687642 y- 5950398 Zone- ASP4 • 12598' 9033' • ADL 028308&028326 TPI: x- 690267 y- 5947147 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 692197 y- 5946694 Zone- ASP4 None 18. Directional Survey: ❑Yes ®No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/MCNL 10131' . 8806' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" _ 94# H-40 Surface 109' Surface 109' 30" 255 sx Arcticset 13-3/8" 72# N-80 Surface 2702' Surface 2702' 17-1/2" 7200 sx Arcticset 9-5/8" 47# N-80/RS-95 Surface 9848' Surface 8577' 12-1/4" 1000 sx Class'G' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 9726' 10131' 8469' 8806' 4-1/8" 111 sx Class'G' 2-3/8" 4.6# L-80 9668' 12568' 8418' 9034' 3" 61 sx Class'G' 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 5-1/2", 17#, N-80 8847'-9612' 9599' N ` 26• A 4-1/2", 12.6#, N-80 9612'-9817' ACID,FRACTURE,CEMENT SQUEEZE,ETC. \I" 0- /L16.\27 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No (^� DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED i` �J •-- 9587'-9592' Tubing Punch t, '�, it 9000' 34 Bbls Class'G' "`: " 8532' Set EZSV Plug 8511' Top of Whipstock 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: ,CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS JAN 2 8 2013so ye' Z• ,z • 13 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only lir r43 ,.S,S h_z ,c' G 29. GEOLOGIC MARKERS(List all formations and mz encounter 30. )RMATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 23SB/Zone 2B 10186' 8850' None 22TS 10259' 8904' 21TS/Zone 2A 10357' 8956' Zone 1B 10492' 8993' TDF/Zone 1A 10940' 9030' MHO 11100' 9041' Top Tar 11150' 9044' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: John Rose,564- 71 Email: John.G.Rose@bp.com Printed Name: Joe astufkTitle: Drilling Technologist a� Sianatur 1' Phone 5644091 Date: 1//1/13 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only 02-12C, Well History (Pre Rig Sidetrack) Date Summary 10/01/12 (E-LINE TBG PUNCH). INITIAL T/I/O=500/80/50 PSI. RIH W/MH-22/AH-38/SWIVEL/MPD/CCL/TBG PUNCHER/BOW SPRING. OAL=31', OAW=220 LBS, MAX OD= 1.69", FISHING NECK= 1-3/8".- CORRELATED TO TT DATED 12/30/1977. EXTENSION SBR FROM 9544'-9588'ON TALLY SEEN FROM 9544'-9585', EVERYTHING BELOW IS 3'SHALLOW. SHOT 4 SPF TBG PUNCH FROM 9587'- 9592', HOLES CONFIRMED ON GUN. FINAL T/I/O= 1160/0/150 PSI. 10/03/12 T/I/0=1100/0/235 SI Circ Out(SIDETRACK) Pumping down TBG taking returns up IA thru hardline to 02- 35 FL. Pumped 5 bbls meth followed by 200 bbls seawater, 180 bbls diesel, 360 bbls seawater. 10/04/12 Continue to pump additional 320 bbls seawater for total of 490 bbls followed by 58 bbls diesel down TBG out IA to 02-35 FL to circ out well and FP. DSO/PE notified Hang Tags Valve positions=SV WV SSV closed MV open CVs OTG FWHP=580/630/120. 10/09/12 CTU#8 w/1.75"CT(CTV=33.1). Objective: Cement PxA for rotary WO/sidetrack. MIRU after bi-weekly maintenance. Weekly BOPE test w/no failures. RIH w/2.5"OD BDN assy taking diesel returns to OTT. 10/10/12 CTU#8 w/1.75"CT(CTV=33.1). Objective: Cement PxA for rotary WO/sidetrack. Continue checking wall thickness of CT parked —7600'and find CT below SWS minimums. POH. FP wellbore with diesel to 2000'. Blowdown CT w/N2. RDMO to SWS yard to swap pipe or cut out bad spot. 10/11/12 CTU#8 w/1.75"CT(CTV=35.2). Objective: Cement PxA for rotary WO/sidetrack. MIRU from SWS yard / after pipe swap. 10/12/12 RIH w/1.9"ctc,two 2"stingers, 2 1/8'crossover,two 2 1/8"stingers, 2.5"cmt nozzle(oal=17.6')..Tag plug at 9655' up wt. PUH to 9500'. circ 2 bbls from tbg into IA and confirm good circulation. Lay 34 bbls 15.8 ppg cement. PUH to safety and open IA and circ 22 bbls cement into IA measuring returns into 40 bbl gauge tank. cleanout with biozan to 9000'and chase returns at 80% . FP well to 2500'with diesel. 10/15/12 PERFORM PASSING MIT-T TO 2500 psi. DRIFT W/4.30"CENT. &3"SAMPLE BAILER TO CEMENT PLUG @ 8978' SLM.(recovered 1 pint of cement). 10/18/12 INITIAL T/I/O =20/0/0. CUT TBG @ 8820'W/5 1/2"JET CUTTER (2' BELOW COLLAR) (TAGGED CEMENT @8873'). TIED INTO TBG TALLY DATED 30-DEC-77. CUT CONFIRMED BY PUMPING DOWN TBG W/TRIPLEX AND SEEING PRESSURE INCREASE ON IA. FINIAL T/I/O=40/20/0. 10/20/12 T/I/O 40/0/0 Temp=Sl, CMIT-TxIA PASSED to 3500 psi; MIT-OA PASSED to 2000 psi (Reservoir P&A) Pressured up TBGand IA with 10 bbls of diesel to reach 3627/3533 psi. CMIT-TxIA lost 16/15 psi in 1st 15 minutes and 11/11 psi in 2nd 15 minutes for a total loss of 27/26 psi in a 30 minute test. Bled Tx IAP. Rig up to OA. Pressured up OA with 1.9 bbls of diesel to reach 2000 psi. MIT-OA lost 121 psi in 1st 15 minutes and 56 psi in 2nd 15 minutes for a total loss of 177 psi in a 30 minute test. Bled OAP. DSO notified of well condition upon departure. FWHP's=50/0/0. 11/30/12 T/I/O=SSV/0+/250,Temp=SI. PPPOT-T(PASS), pre P&A. PPPOT-T: Stung into test port(0+psi), bled to 0 psi. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. Functioned LDS, all moved freely(2.5"). Page 1 of 2 02-12C, Well History (Pre Rig Sidetrack) Date Summary 12/01/12 T/I/O=0/0/260. Conducted PJSM, Barriers=MV&SSV. Closed MV&SSV;tested against SSV to 500 psi. Rigged up lubricator with 1-18"ext and 5 1/8"ISA BPV#538,tested lubricator to 250 psi low(passed)& 3500 psi high (passed).Tagged @ 98", set good. Rigged down lubricator. N/D upper tree& N/U SV to MV(dryhole) using BPV and MV as barriers.Torqued SV x MV connection to API spec. (739 ft/lb). Performed LP shell test on dryhole assembly @ 250 psi (passed)& HP test @ 5000 psi(passed). Job complete. NOTE: annulus valves still need piggyback. 12/04/12 T/I/O=0/0/0. Conduct PJSM. Barriers= IA Valve. Start Barrier List. Piggy back(second) IA valve. Cycled IA valve and performed independent LTT(passed). Removed blind flange and installed additional IA valve to existing IA. Re-installed blind flange onto new additional IA valve.Torqued all connections to API specs. Pressure tested assembly against inner IA gate valve to 200-300 psi. low and 3500 psi. high with no more than 10 psi/min. loss for 5 min.each (passed).Tests charted and documented in field charted test. 12/06/12 T/I/O = BPVNAC/82.Temp=Sl. Bleed IAP&OAP to 0 psi(Reservior P&A). No FL,AL, or scaffolding. Well House has been replaced w/Parker Well House . Bled OAP from 82 psi to 0 psi in 2 min,fluid/gas. Held open bleed for 6 1/2 hrs. Monitor for 30 min. OAP increased 6 psi. Final WHPs=BPVNAC/6. SV=Closed. MV=Open. IA,IA,OA=OTG. NOVP. (0500 hrs). 12/06/12 T/I/O =0/vac/300. Temp=disconnected. Bleed IAP&OAP to 0 psi (Reservoir P&A). Flowline disconnected, no AL,well house and scaffold removed. Bled OAP from 300 to 0 in 5 hours(gas&fluid), held open bleed for additional 4.5 hours. Monitor 30 minutes. IAP increased 30 psi. Final WHPs 0/vac/30. SV=C. MV=0. IA, OA= OTG. NOVP. 12/07/12 T/I/O = BPVNAC/120.Temp=Sl. Bleed IAP&OAP to 0 psi(Reservior P&A). No FL,AL, or scaffolding. Well House has been replaced w/Parker Well House . Bled OAP from 120 psi to 0 psi in 2 min,fluid/gas. Held open bleed for 4 hrs. Monitor for 30 min per WIE. OAP increased 32 psi. Bled OAP from 32 psi to 0 psi in 1 min, gas. Held open bleed for 30 min. During open bleed OAP increased 2 psi&swapped to fluid. SI and monitored 30 min per WIE. OAP increased 34 psi. Left bleed SI &monitored. See Pump Log for details. Job incomplete. Final WHPs=BPVNAC/6. SV=Closed. MV=Open. IA,IA,OA=OTG. NOVP. (1645 hrs). 12/07/12 T/I/O=0/vac/8.Temp=SI. Bleed IAP&OAP to 0 psi (Reservoir P&A). No AL or flowline. Let OAP stack out to 51 psi in 2 hours (See log).Final T/I/O=0/vac/51. SV=C. MV=0. IA&OA=OTG. NOVP. 05:35. 12/08/12 T/I/O=0/vac/51.Temp= SI. Bleed IAP&OAP to 0 psi (Reservoir P&A)continue from 12/7/12. No AL, flowline or tree scaffold. Let OAP stack out to 81 psi in 4 hours(See log). Bled OAP to 0 psi in< 1 minute (All fluid — 1 gal). Monitor 30 minutes. OAP increased 14 psi. Extend monitor 30 minutes. OAP increased 32 psi. Final T/I/O =0/vac/46. SV=C. MV=0. IA&OA= OTG. NOVP. 05:35. 12/08/12 T/I/0= BPVNac/?.Temp=SI. Bleed IA&OA to 0 psi (Reservior P&A). No AL or flowline.2 valve tree only. Initial OAP unknown due to faulty gauge(showed 4 psi). Bled—1 qt.to bucket to ensure jewelry not frozen. New gauge showed OAP @ 27 psi. Monitored WHPs for shift. See log for details.Job complete. Final WHPs= BPVNac/79. Upper valve= Unk(unable to reach). Lower valve=O. IA&OA=OTG. NOVP. 1655 hrs. Page 2 of 2 L , • f Pa•e 1 Operation Summary Report° t rte. ,. ,_._ ... ..:........ .* Common Well Name: 02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date X3-012G3-C: (9,728,000 00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/7/2012 08:00 - 12:00 4.00 MOB P DECOMP BEGIN RIG OPERATIONS WITH PARKER 273 NEW DRILLING RIG AT 08 00 ON 12/7/12. MOVE MUD MODULE FROM CRAZY HORSE PAD IN DEADHORSE TO DRILLSITE 2. 12:00 - 20:00 8.00 MOB P DECOMP CONTINUE WITH RIG MOVE -MUD MODULE FROM PARKER CRAZY HORSE -PAD TO DRILL SITE 2. -STAGE MUD MODULE ON DRILL SITE 2 -NOTIFIED AOGCC OF IMPENDING 48-HR INITIAL RIG INSPECTION AND BOPE TEST, DECEMBER 06,2012, 18:03-HRS. VERIFICATION OF NOTICE RECIEVED FROM AOGCC REPRESENITIVE CHUCK SCHEVE AT 05:34 AM, DECEMBER 07,2012. -UPDATE PROVIDED TO AOGCC REPRESENITIVE CHUCK SCHEVE AT 11:12 AM,DECEMBER 07,2012. 20:00 - 21:30 1.50 MOB P DECOMP PREPARE TO MOVE UTILITY MODULE -TRAVEL TO CRAZY HORSE PAD -WARM HYDRALIC MOVING SYSTEM ON UTILITY MODULE. 21:30 - 00:00 2.50 MOB P DECOMP MOVE UTILITY MODULE FROM CRAZY HORSE PAD -CONTINUE TO WARM UP MOVING SYSTEM ON UTILITY MODULE TO 95-100 DEG. -MOVE UTILITY MOD ACROSS CRAZY HORSE PAD SEVERAL TIMNES TO VERIFY HYDRAULIC SYSTEM IS WARM AND OPERATIONAL. -PULL MODULE ONTO ROAD AND MOVE TO JUST PAST BROOKS RANGE SUPPLY BY 24:00-HRS 12/8/2012 00:00 - 07:00 7.00 MOB P DECOMP RIG MOVE -MOVE UTILITY MODULE TO DS-02. 07:00 - 07:30 0.50 MOB P DECOMP CREW TRAVEL -DS-02 TO CRAZY HORSE PAD IN CREW VAN 07:30 - 10:30 3.00 MOB P DECOMP PREPARE TO MOVE DRILL MODULE -TURN AND WARM UP TIRES ON DRILL MODULE 10:30 - 12:00 1.50 MOB P DECOMP MOVE DRILL MODULE -PULL DRILL MODULE OFF PARKER CRAZY HORSE PAD -COMMENCE MOVE TO DS-02 12:00 - 22:00 10.00 MOB P DECOMP CONTINUE WITH MOVING DRILL MODULE TO DS-02 -REPAIR BREAKER FOR PUMP ON MOVING SYSTEM 22:00 - 00:00 2.00 MOB P DECOMP REPOSITION RIG -DUE TO SLOPED PORTION ON NORTH SIDE OF PAD AT ACCESS ROAD NEAR CORNER. -CRIB UP OFF DRILLER SIDE OF DRILL MOD. TO REPOSITION WHEELS -STRAIGHTEN WHEELS,CONTINUE WITH MOVING RIG DOWN PAD TOWARDS WELL. 12/9/2012 00:00 - 02:00 2.00 MOB P DECOMP MOVE DRILL MODULE ONTO MATS IN FRONT OF WELL 02-12 Printed 1/14/2013 2:22:05PM •,F Wirth America ALASKA BP Page:, of Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) 'Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000 00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 08:00 6.00 MOB P DECOMP POSITION DRILL MODULE OVER WELL 02-12 -PJSM FOR SPOTTING DRILL MODULE ON WELL. -FUNCTION TEST EMERGENCY STOP. NOT OPERABLE,DISCUSS PLAN FORWARD WITH WTL. -VERIFY OA,IA,TUBING ALL 0-PSI. 08:00 - 12:00 4.00 MOB P DECOMP SPOTUTLITIY MODULE -PREPARE TO SPOT MUD MODULE 12:00 - 13:00 1.00 MOB P DECOMP AFTER ACTION REVIEW(AAR) -AAR WITH BP-WSL,PARKER RIG MANAGER AND RIG CREW ON MOVE FROM CRAZY HORSE YARD TO DS-02 13:00 - 18:00 5.00 MOB P DECOMP CONTINUE MOVING MUD MODULE INTO POSITION -PIN PEDESTALS IN UTILITY MOD.AND MUD MOD.ON WELL END. -RU FRONT OF UTILITY MOD.AND MUD MOD TO PIN ALL PEDESTALS. -RD AND CLOSE ALL CARRIER BAY DOORS. 18:00 - 00:00 6.00 MOB _ P DECOMP RIG UP FOR RIG ACCEPTANCE -HOOK UP ALL SERVICE AND ELECTRICAL CONNECTIONS AT INTERCONNECTS FROM DRILL MODULE TO UTILITY AND MUD r` . MODULES. 12/10/2012 00:00 - 03:00 3.00 ;MOB P DECOMP PREPARE RIG FOR WELL OPERATION&RIG ACCEPTANCE. -RU DUMMY WELL HOUSE&CONNECT POWER TO SAME -RU HARD LINE&OPEN TOP TANK TO CELLAR. -SET IN POSITION CAMP&SHOP. 03:00 - 06:00 3.00 MOB P DECOMP RU HEATERS&ALL INTERCONNECTS AT DRILL,MUD&UTILITY MODULES. -CONNECT CEMENT LINE BETWEEN UTILITY MODULE&DRILL MODULES. -RU DOUBLE VALVE ON OA. 06:00 - 09:00 3.00 MOB P DECOMP SHIM UTILITY MODULE -BERM CUTTINGS TANK. 09:00 - 12:00 3.00 MOB P DECOMP TAKE ON FRESH WATER TO BRINE TANKS • -BRING ONBOARD BP OWNED NEW COMMISSION IRON PACKAGE FOR RIG 273, CERTIFIED FMC PLUG VALVES,SWIVEL'S& FLANGE ADAPTERS -REMOVE PARKER NONE CERTIFIED 1502 EQUIPMENT OFF RIG. -FUNCTION TEST BUMPER&A-LEG PINS -VISUAL DERRICK INSPECTION. -CONTINUE INSTALLING BELTS ON TRIP TANK PUMPS 12:00 - 15:00 3.00 MOB P DECOMP COMPLETE JSA'S&PERMITS FOR THE FOLLOWING TASKS -RAISING DERRICK,SKIDDING RIG FLOOR& HAUNCH -UNLOCK/UNTAG PITS,MANRIDER OPERATIONS -PIPEBARN&MOVING FLUID OPERATIONS PERFORM PRE-RAISING DERRICK CHECKLIST -WARM UP HYDRAULICS PRIOR TO DERRICK RAISING. Printed 1/14/2013 2.22:05PM f � 10 r North America-ALASKA- BP Page 3 c4:342... Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.:PARKER 273 'Spud Date/Time: 11/25/1977 12:00:OOAM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 16:00 1.00 MOB P DECOMP RAISE DERRICK -FLEX&WORK DERRICK SEVERAL TIMES PRIOR TO PULLING OFF HEADACHE RACK. -RAISE DERRICK&PIN. DERRICK PULLS OFF RACK AT 570K -CLOSE V-DOOR AT RIG FLOOR. 16:00 - 17:00 1.00 MOB P DECOMP PREP&SKID RIG FLOOR. --BLOW DOWN STEAM TO RIG FLOOR .-SKID RIG FLOOR 17:00 - 18:00 1.00 MOB P DECOMP SKID HAUNCH INTO DRILLING POSITION. -HOOK UP STEAM TO RIG FLOOR 18:00 - 00:00 6.00 MOB P DECOMP RU RIG FLOOR -BRIDAL DOWN BLOCKS -HANG BRIDAL LINES, PIN BLOCKS TO TD -TRANSFER WATER FROM PIT TO PIT. -UNPIN FORUM CRANE&BALL -PREP IDM,WIRE TIE BLOCK PIN KEEPERS r -UNTIE SERVICE LOOPS&KELLY HOSE. -PIN TORQUE TUBE 12/11/2012 00:00 - 09:00 9.00 MOB P DECOMP GENERAL RIG UP OPERATIONS -PIN STABBING BOARD TO DRILLING POSITION. -MOVE IDM FROM STORAGE POSITION. -RAISE PIPE CAT ' -CONNECT STANDPIPE, CEMENT&MUD ' LINES TO MANIFOLD. -HAMMER UP JUMPER HOSE FROM MUD LINE TO FREEZE PROTECT MANIFOLD. -CUT GRATING AND FIT INTO CELLAR. -LEAKTIGHT PRESSURE TEST MUDLINE TO 625 PSI FOR 10 MIN. -GREASE VALVES ON TESTING MANIFOLD **PERFORM RIG EVACUATION DRILL WITH RIG TEAM 05:00 HRS** ACCEPT PARKER 273 DRILLING RIG AT 02:30 09:00 - 17:00 8.00 RIGU P DECOMP RIGUP FOR PRESSURE WELLBORE INTEGRITY PRESSURE TESTING. LEAKTIGHT TEST ALL SURFACE LINES, INCLUDING LINE OUT TO FLOWBACK TANK. UPDATE WORK SAFE PROCEDURE(WSP)AS RIG TEAM DURING RIGUP. LOAD PITS WITH SEAWATER. 17:00 - 18:30 1.50 RIGU P DECOMP PRESSURE UP DOWN IA WITH SEAWATER TO COMPLETE CMIT-TXIA TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TESTS,SEE ATTACHED DOCUMENTATION). TEST CONFIRMS CMT PLUG, FULL COLUMN KWF,AND BPV AS BARRIERS FOR NIPPLE DOWN OF TREE. RIG DOWN PRESSURE TESTING EQUIPMENT FROM IA. Printed 1/14/2013 2:22:05PM •�1orth America-ALASKA- BP Page 4 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 I Spud Date/Time: 11/25/1977 12:00:OOAM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 00:00 5.50 RIGU P DECOMP RIG UP TO OA AND LINEUP RIG TEST PUMP WITH DIESEL. UNSUCCESSFULLY ATTEMPT TO PRESSURE TEST OA TO 250 PSI LOW AND 2000 PSI HIGH FOR 30 MIN THREE TIMES. AFTER THIRD ATTEMPT DISCOVER MINOR LEAK AT FLANGE TO 1502 CONNECTION ON OUTER ANNULUS. ATTEMPT TO TEST OA -FOURTH TIME UNSUCCESSFULLY(LOSSES 175 PSI IN FIRST 15 MIN AND 75 PSI IN SECOND 15 MIN). ALL PRESSURE TESTING CHARTS ARE ATTACHED. PER WELL PROGRAM,FAILING MIT-OA DOES NOT PREVENT CONTINUATION OF WELL PROGRAM. BASED ON PASSING CMIT-TXIA, PERMISSION TO PROCEED WITH NIPPLE DOWN OF TREE RECEIVED FROM WELLS TEAM LEADER AT 01:30 ON 12/12/12. 12/12/2012 00:00 - 01:30 1.50 RIGU P DECOMP BLOWDOWN AND RIG DOWN PRESSURE TESTING LINES AFTER INITIAL WELLBORE INTEGRITY TESTING. -THAW OUT SEVERAL SECTIONS OF LINE DUE TO FREEZING DURING BLOWDOWN _ I OPERATIONS. 01:30 - 08:30 7.00 WHSUR P DECOMP PREJOB SAFETY MEETING FOR NIPPLE DOWN TREE. FMC REPRESENTATIVE ONSITE TO BLEED OFF 500 PSI FROM CONTROL LINES. NIPPLE DOWN DOUBLE 7-1/16"MASTER VALVE DRYHOLE TREE AND FMC 13-5/8"X 7-1/16"TUBING HEAD ADAPTER FLANGE(NORM TEST AND SEND IN FOR INSPECTION). VERIFY 5-1/2"BTC CSG HANGER THREADS IN GOOD CONDITION. INSTALL FMC BLANKING PLUG WITH 9 TURNS. NOTE: TUBING HANGER HAS WELDED NECK. DISCUSS PLAN WITH BAKER TO USE SPEAR TO PULL TUBING. LIFT RISER SECTIONS INTO BOP DECK FOR BOP NIPPLE UP. 08:30 - 22:30 14.00 BOPSUR P DECOMP NIPPLE UP SPACER SPOOLS, FLOW NIPPLE, AND 13-5/8"5K SHAFFER BOP STACK AS FOLLOWS(SEE ATTACHED BOP STACK DIAGRAM): -13-5/8"SHAFFER SPHERICAL BOLTED COVER BOP -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS -13-5/8"5K SHAFFER LXT BLIND-SHEAR RAMS -MUD CROSS WITH 3-1/8"INNER MANUAL GATE VALVES AND OUTER 3-1/8"HCR VALVES ON BOTH CHOKE AND KILLS LINES. -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS. GREASE ALL CHOKE MANIFOLD VALVES. INSTALL MOUSE HOLE. 22:30 - 00:00 1.50 BOPSUR P DECOMP OPEN RAM DOORS AND VISUALLY INSPECT ELEMENTS. ALL ARE IN GOOD CONDITION. Printed 1/14/2013 2:22:05PM Ogorth America -ALASKA- BP • Operation Summary Report ''.. Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 1200:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) i Date From-To Hrs Task Code ' NPT NPT Depth Phase Description of Operations (hr) (ft) 12/13/2012 14:00 - 00:00 10.00 BOPSUR P DECOMP FUNCTION-PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH , PER AOGCC REQUIREMENTS AND BP DWOP STANDARDS TESTS WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI. -TEST COMPLETED On 12/15/12. -NOTE DURING INITIAL 5000 PSI SHELL TEST AGAINST OUTER CHOKE VALVES, DISCOVER to LEAKING DOOR SEALS ON UPPER RAMS. \ CHANGEOUT SAME ALSO HAVE TO GHTEN KILL LINE K4 GATE VALVE FLANGE /( )(NOTE DURING TESTING OF SUPERCHOKE, UNABLE TO BUILD AND HOLD ANY PRESSURE WITH SUPERCHOKE. CALL OUT MECHANIC AND MOVE TO NEXT TEST WHILE WAITING ORIGINAL 24 HOURS NOTIFICATION OF , r INTENTION TO TEST BOPE WAS PROVIDED - TO AOGCC REPRESENTATIVE LOU GRIMALDI • BY EMAIL AT 16.00 ON 12/10/12. MR GRIMALDI WAS UPDATED BY EMAIL ON 12/12/12 AT 05 45 FINAL CALLOUT TO LOCATION WAS AT 9.00 ON 12/13/12 22:30-OA PRESSURE=400 PSI. BLEED OFF 5 GALLONS TO 0 PSI. __. 00:00 - 02:00 2.00 BOPSUR P DECOMP INSTALL BELL NIPPLE BETWEEN ANNULAR PREVENTER AND RIG FLOOR. WELDER ON LOCATION TO INSTALL CLAMP AROUND BELL NIPPLE TO HOLD IT IN THE CORRECT PLACE IN THE FUTURE. 02:00 - 0930 7.50 BOPSUR P DECOMP RIG UP TO PRESSURE TEST BOPE. PRESSURE UP ACCUMULATOR. FUNCTION TEST BOPS. RUN 5-1/2"TEST JOINT IN HOLE AND SCREW INTO FMC BLANKING PLUG. FILL ALL SURFACE LINES AND STACK. OPEN IA VALVES TO PRESSURE GAUGES TO MONITOR DURING TEST. 03:00-OA PRESSURE=500 PSI. BLEED OFF 8 GALLONS TO 0 PSI. 09:30 - 11:30 2.00 BOPSUR N SFAL 8,998.00 DECOMP ATTEMPT TO PERFORM FIRST TEST OF BOP PROCEDURE AS SHELL TEST. DISCOVER LEAK PATH OUT IA VALVE DRAIN STACK, PULL TEST JOINT AND FMC BPV BLANKING PLUG. APPLY TEFLON PASTE TO THREADS AND REPLACE BALL IN BLANKING PLUG. RESET IN BPV THROUGH BOP STACK. 11:30 - 12:30 1.00 BOPSUR P DECOMP HOLD AAR WITH BOTH RIG CREWS TO DISCUSS BOP NIPPLE UP. 12:30 - 14:00 1.50 BOPSUR N SFAL 8,998.00 DECOMP FILL STACK AND SURFACE LINES. COMPLETE RIGGING UP FOR BOPE TEST. I 1i • Printed 1/14/2013 2:22:05PM forth America-ALASKA- BP • Page 6 O'er-tion Summary Report Common Well Name:02-12 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date. X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75 88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/14/2012 00:00 - 03:00 3.00 BOPSUR P DECOMP CONTINUE TO FUNCTION-PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH PER AOGCC REQUIREMENTS AND BP DWOP STANDARDS. TESTS WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI. ADDITIONAL COMMENTS ABOUT TEST ARE IN FINAL TIME SUMMARY ENTRY FOR BOPE TESTING ON 12/15/12. NOTE: DURING ACCUMULATOR FUNCTION TESTING,3300 PSI SYSTEM POPOFF RELEASED. CALL OUT MECHANIC. AOGCC REP LEAVES LOCATION. 03:00 - 16:00 13.00 BOPSUR N RREP 8,988.00 DECOMP IADC REPORT CODE 8 NPT: PARKER MECHANIC ONSITE TO REBUILD ACCUMULATOR POPOFF AND TROUBLESHOOT REMOTE HYDRAULIC CHOKE. CHOKE APPEARS TO RE-OPEN WHEN HANDLE IS HELD OVER IN CLOSED POSITION. PARKER MECHANIC ONSITE TO ALSO -TROUBLESHOOT AND REBUILD ACCUMULATOR AIR PUMPS. AOGCC REPRESENTATIVE LOU GRIMALDI RETURNS TO LOCATION AT 4 PM. 16:00 - 20:00 4.00 BOPSUR P DECOMP CONTINUE TO TROUBLESHOOT REMOTE HYDRAULIC CHOKE. l) COMPLETE ACCUMULATOR FUNCTION TESTING. COMPLETE BLIND-SHEAR FUNCTION-PRESSURE TEST+HT38 AND 4-1/2"IF FOSVS TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASS). 20:00 - 00:00 4.00 BOPSUR N RREP 8,988.00 DECOMP IADC REPORT CODE 8 NPT: PARKER MECHANIC ON LOCATION TO CHANGEOUT SUPERCHOKE. 21:30-OA PRESSURE=225 PSI. BLEED OFF 2.5 GAL TO 0 PSI. 12/15/2012 00:00 - 06:00 6.00 BOPSUR N RREP 8,988.00 DECOMP CONTINUE IADC REPORT CODE 8 NPT: PARKER MECHANIC ON LOCATION TO CHANGEOUT SUPERCHOKE. AFTER REPLACEMENT,STILL HAVE SAME PROBLEM. UNABLE TO MATCH DIGITAL READOUT GAUGE ON RIG FLOOR CONTROL PANEL WITH ACTUAL CHOKE POSITION. CALLOUT ELECTRICIAN TO CHANGEOUT DIGITAL CHOKE POSITION GAUGE. AFTER INSTALLATION, RETEST BREAKS ON BOTH SIDES OF CHOKE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASS). • Printed 1/14/2013 2.22:05PM 4orth America -ALASKA- BP I Page 7 •'` Operation Summary Ra ort Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75 88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 10:00 4.00 BOPSUR P DECOMP CONTINUE BOP TESTING: RE-PRESSURE TEST CHOKE AND KILL HCR VALVES TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH DUE TO QUESTIONABLE EARLIER RESULTS. CHOKE HCR VALVE FAILS HIGH TEST. PERFORM FINAL ACCUMULATOR UNIT DRAWDOWN TEST. ALL COMPONENTS HAVE BEEN FUNCTIONED FROM ALL PRIMARY AND REMOTE STATIONS. 10:00 - 13:30 3.50 BOPSUR N RREP 8,988.06, DECOMP IADC REPORT CODE 8 NPT: CHANGEOUT CHOKE LINE HCR VALVE. 13:30 - 16:00 2.50 BOPSUR P DECOMP COMPLETE BOPE TESTING: PRESSURE TEST CHOKE LINE HCR VALVE+BREAKS TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS). SUMMARY OF FULL 50 HR BOP TEST IS BELOW. -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED. -ANNULAR TESTED WITH 4"TEST JOINT. -VERS TESTED WITH 4"AND 5-1/2"TEST JOINTS. -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. Q,I� CLOSURE TIMES FOR BOP COMPONENTS h" ALL MEASURED -HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR 1 LEAKOFF RATE. -14 N2 BOTTLES AVERAGE PRESSURE= 2084 PSI -5 FAIUPASS RESULTS(UPPER VBRS, LOWER VBRS,SUPERCHOKE, ACCUMULATOR,AND CHOKE MANIFOLD VALVE 11) -ALL H2S AND LEL GAS ALARMS CALIBRATED AND TESTED. -PVT SYSTEM,INCLUDING FLOW PADDLE, CALIBRATED AND TESTED. 16:00 - 17:00 1.00 BOPSUR P DECOMP PULL TEST JOINT WITH FMC BLANKING PLUG FROM TBG HANGER PROFILE IN WELLHEAD. RIG DOWN TEST JOINT AND OTHER BOPE TESTING EQUIPMENT. 17:00 - 18:00 1.00 WHSUR P DECOMP RIG UP DUTCH RISER FROM ANNULAR PREVENTER TO RIG FLOOR. 18:00 - 21:00 3.00 WHSUR N WAIT 8,998.00 DECOMP WAIT ON DUTCH RISER 7"ACME X 7"OTIS XO FROM TOOL SERVICE. 21:00 - 00:00 3.00 WHSUR P DECOMP MIRU VALVE SHOP LUBRICATOR CREW. RIG UP SHORT"GRAY"LUBRICATOR TO DUTCH RISER -RIG UP PRESSURE TESTING EQUIPMENT IN PREPARATION FOR TESTING LUBRICATOR WITH WELLBORE AND BLEEDING OFF TO FLOWBACK TANK. 12/16/2012 00:00 - 02:00 2.00 WHSUR P DECOMP RIG UP TO BLEED DOWN AFTER LUBRICATOR/WELLBORE TEST TO FLOWBACK TANK. -THAW FROZEN HARDLINE TO TANK. Printed 1/14/2013 2.22:05PM 111Plorth America -ALASKA- BP • Page 8 o Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 05:00 3.00 WHSUR P DECOMP PRESSURE TEST VALVE SHOP LUBRICATOR AND WELLBORE TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TEST). BLEED OFF ALL PRESSURE. PULL 5-1/8"FMC ISA BPV. RIG DOWN LUBRICATOR. CLOSE BLIND RAMS. • - NEW WELL BARRIERS: CEMENT PLUG, KWF, BOPS. 05:00 - 06:00 1.00 WHSUR P DECOMP RIG DOWN DUTCH RISER. 06:00 - 07:00 1.00 PULL P DECOMP RIG UP TO CIRCULATE OUT DIESEL FREEZE PROTECT FROM TUBING AND IA TO FLOWBACK TANK. 07:00 - 10:00 3.00 PULL P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT FROM WELL AS FOLLOWS: REVERSE CIRCULATE 75 BBLS 8.5 PPG SEAWATER INTO IA,TAKING RETURNS OUT TUBING TO FLOWBACK TANK;5 BPM,400-500 PSI. SWITCH OVER TO TUBING AND PUMP 35 BBL DEEP CLEAN(SOAP)PILL DOWN TUBING FOLLOWED BY 593 BBLS SEAWATER(1 SURFACE TO SURFACE VOLUME);6 BPM, _640-830 PSI. MONITOR WELL FOR 10 MIN AFTER CIRCULATING. WELL STATIC. 09:00-BLEED OFF 1500 PSI OA PRESSURE. 10:00 - 14:30 4.50 PULL P DECOMP RIG UP DOYON CASING TONGS,SLB SPOOLING UNIT AND SAFETY JOINT WITH FOSV IN PIPE SHED IN PREPARATION FOR PULLING 5-1/2"TUBING. LIFT BAKER SPEAR TO RIG FLOOR. 14:30 - 17:00 2.50 PULL P DECOMP RUN IN HOLE WITH SPEAR ASSEMBLY. TAG UP AT 53'MD. PICKUP TO VERIFY SPEAR ENGAGED IN TUBING. FMC REPRESENTATIVE ON LOCATION TO BACKOUT LOCKDOWN SCREWS ON TBG HANGER. 17:00 - 19:00 2.00 PULL P DECOMP PICKUP TO OFFSEAT HANGER WITH 180 KLBS. PULL HANGER TO RIG FLOOR. PICKUP WEIGHT=165 KLBS,SLACKOFF= 140 KLBS. MONITOR WELL FOR 10 MIN. WELL IS STATIC. LAYDOWN SPEAR ASSEMBLY AND TUBING HANGER. RIG UP TO CIRCULATE. 19:00 - 21:00 2.00 PULL P DECOMP CIRCULATE ONE BOTTOMS UP(387 BBLS)AT 400 GPM,250 PSI. SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN. WELL IS STATIC. SLOW PUMP RATES AT 8840'MD,8.5 PPG SEAWATER: MP#1: 30 SPM=26 PSI,40 SPM=26 PSI,50 SPM=35 PSI MP#2 30 SPM=25 PSI.40 SPM=25 PSI.50 SPM=35 PSI 21:00 - 22:00 1.00 PULL P DECOMP BLOWDOWN TOP DRIVE AND CHANGEOUT ELEVATORS FROM BX TO YC SLIP TYPE FOR PULLING TUBING. Printed 1/14/2013 2:22:05PM •orth America-ALASKA- BP Page 9 ØW 4-4 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No: PARKER 273 Spud Date/Time: 11/25/1977 12:00.00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To ' Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2", 17#, N-80,A-B MOD 8RD TUBING FROM 8840'MD TO 8678'MD AT MIDNIGHT. SPOOL DUAL CONTROL LINES AND REMOVE 1 CONTROL LINE CLAMP PER JOINT. HOLD KICK WHILE TRIPPING DRILL WITH —AAR. SECURE WELL PER STANDING ORDERS IN 2:30. 12/17/2012 00:00 - 05:30 5.50 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2'', 17#. N-80.A-B MOD 8RD TUBING FROM 8678' MD AT MIDNIGHT TO 6895MD SPOOL DUAL CONTROL LINES AND REMOVE 1 CONTROL LINE CLAMP PER EVERY OTHER JOINT 00:30-BLEED OFF 1200 PSI OA PRESSURE. 05:30 - 07:30 2.00 PULL P DECOMP HOLD KICK WHILE TRIPPING DRILL. SECURE WELL,THEN SIMULATE HYDRAULIC JACKING FORCE FROM WELL IS OVERCOMING ANNULAR PREVENTER HOLD OF TUBING. MAKEUP SAFETY JOINT AND PREPARE TO STRIP IN HOLE. CONDUCT AAR. -LESSONS LEARNED INCLUDE HAVING MANUAL ELEVATORS ON RIG FLOOR FOR SAFETY JOINT AND HAVING 10' LIFTING SUB PUP JOINT ON TOP OF SAFETY JOINT IN PIPE BARN FOR HANDLING. 07:30 - 09:30 2.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 6895'MD 10 6653'MD(81 JOINTS),SPOOLING DUAL CONTROL LINES;AVERAGE—12-15 JOINTS PER HOUR. -2 STAINLESS STEEL BANDS RECOVERED FROM DIRECTLY UNDER TBG HGR. -41 RUBBER CLAMPS RECOVERED. 09:30 - 10:30 1.00 PULL P DECOMP RIG DOWN SLB AIR CONTROLLED SPOOLING UNIT. CONTROL LINES TESTED FOR NORM PRIOR TO REMOVAL FROM SITE. 10:30 - 13:30 3.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 6653'MD TO 5175'MD;AVERAGE 18 JOINTS PER HOUR WITH NO CONTROL LINES. MONITOR OPEN OA BLEED TO FLOWBACK TANK. NO CONTINUOUS FLOW FROM OA AND NO PRESSURE BUILDUP OBSERVED. 13:30 - 15:00 1.50 PULL P DECOMP HOLD KICK WHILE TRIPPING DRILL SECURE WELL,THEN SIMULATE HYDRAULIC JACKING FORCE FROM WELL IS OVERCOMING ANNULAR PREVENTER HOLD OF TUBING. MAKEUP SAFETY JOINT AND PREPARE TO STRIP IN HOLE. CONDUCT AAR. 15:00 - 23:00 8.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2", 17#,N-80,A-B MOD 8RD TUBING FROM 5175'MD TO 1100'MD;AVERAGE 19 JOINTS PER HOUR. MONITOR OPEN OA BLEED TO FLOWBACK TANK. NO CONTINUOUS FLOW FROM OA AND NO PRESSURE BUILDUP OBSERVED. Printed 1/14/2013 2:22'05PM *North America -ALASKA- BP • Page 10&art Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release. Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 23:30 0.50 PULL P DECOMP HOLD H2S RIG EVACUATION DRILL. DRILLER AND FLOORHAND SECURE THE WELL AND THEN JOINS ENTIRE RIG TEAM IN PRIMARY MUSTER AREA. CONDUCT AAR. 23:30 - 00:00 0.50 PULL P DECOMP LAYDOWN 5-1/2"TUBING FROM 1100'MD TO 750'MD. 12/18/2012 00:00 - 01:30 1.50 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5 1/2",17#,N 80,A-B MOD 8RD TUBING FROM 750'MD AT MIDNIGHT TO SURFACE. --TOTAL RECOVERY OF 325 FULL JOINTS+1 SSSV ASSEMBLY(TBG PUP,OTIS FLOW COUPUNG,OTIS RQY LANDING NIPPLE,OTIS FLOW COUPLING,TBG PUP) -CUT JOINT=29"LONG,FLARE OD=6.25" (SEE ATTACHED PICTURE) -ALL COMPLETION EQUIPMENT LABELED AND TESTED FOR NORM PRIOR TO REMOVAL FROM SITE. 01:30 - 02:00 0.50 PULL P DECOMP RIG DOWN DOYON CASING TONGS RIG FLOOR AFTER LAYING DOWN COMPLETION. 02:00 - 05:00 3.00 CLEAN P DECOMP CHANGEOUT ELEVATORS TO HYDRAULIC BX ELEVATORS. RIG UP PS-21 HYDRAULIC SLIPS _ LOAD HWDP AND DC IN PIPE BARN. 05:00 - 06:00 1.00 WHSUR P DECOMP INSTALL WEAR BUSHING, ID=8-7/8". DEVELOP PARKER PROCEDURE FOR - RUNNING/PULLING WEAR BUSHING. 06:00 - 07:00 1.00 CLEAN P DECOMP MAKEUP 8-1/2"HUGHES VM-3 TRI-CONE BIT AND BIT SUB AS BHA FOR PICKING UP DRILLPIPE. 07:00 - 12:00 5.00 CLEAN P DECOMP PICKUP AND SINGLE IN HOLE WITH 4",14#, S-135,HT38 DRILLPIPE FROM BHA AT 7'TO 955'MD. 12:00 - 13:30 1.50 CLEAN P DECOMP CREW CHANGEOUT. CLEAN MAGNETIC SENSOR ON TOP DRIVE LINK TILT ASSY. CALIBRATE FLOW SENSOR ON FLOW LINE. 13:30 - 15:00 1.50 CLEAN P DECOMP CONTINUE TO SINGLE IN HOLE WITH4" DRILLPIPE FROM 955'MD TO 1429'MD. 15:00 - 15:30 0.50 CLEAN P DECOMP HOLD KICK WHILE TRIPPING(D-1)DRILL AND MR WITH MASSIE CREW. 15:30 - 19:00 3.50 CLEAN P DECOMP SINGLE IN HOLE WITH 4"DRILLPIPE FROM 1492'MD TO 3042'MD. 96 TOTAL JOINTS PICKED UP. PU WEIGHT=93 KLBS, SLACKOFF=76 KLBS. 19:00 - 20:30 1.50 CLEAN P DECOMP CIRCULATE 2 BOTTOMS UP WHILE RECIPROCATING AND ROTATING STRING,60 RPM,500 FT-LBS TORQUE,200 SPM,846 GPM,1840 PSI. SLOW PUMP RATES AT 3042'MD,8.5 PPG SEAWATER. MP#1. 20 SPM=27 PSI,30 SPM=60 PSI,40 SPM=108 PSI MP#2: 20 SPM=27 PSI,30 SPM=57 PSI,40 SPM= 103 PSI. Printed 1/14/2013 2.22:05PM North America-ALASKA-BP 410 Page 11 s • •enation Summary Report Common Well Name. 02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 CLEAN P DECOMP HOLD MR WITH RIG CREWS TO DISCUSS PICKING UP SINGLES AND TRIPPING IN HOLE. HOLD PRE-JOB SAFETY MEETING TO DISCUSS RACKING BACK PIPE IN DERRICK, FIRST OPERATIONS WITH IRON DERRICKMAN. 21:30 - 23:00 1.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BIT "'ASSEMBLY FROM 3042'MD TO 1146'MD, RACKING BACK. • 23:00 - 00:00 1.00 CLEAN P DECOMP HOLD WELL KILL(D-5)DRILL WITH MASSIE CREW AFTER SHUTTING IN WELL DURING SIMULATED KICK. APPLY 300 PSI TO WELLBORE AND PRACTICE CHOKE OPERATIONS. 12/19/2012 00:00 - 02:00 2.00 CLEAN P DECOMP CREW CHANGEOUT. DRAIN MUD-GAS SEPARATOR. RE-OPEN WELL AFTER WELL KILL DRILL WITH MASSIE CREW ON 12/18/12. RIG DOWN PS-21 HYDRAULIC SLIPS. 02:00 - 03:30 1.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BIT CLEANOUT BHA FROM 1146'MD TO SURFACE, RACKING BACK DRILLPIPE. BREAK OFF BIT AND BIT SUB. 03:30 - 04:30 1.00 CLEAN P DECOMP -LOAD CLEANOUT ASSEMBLY TOOLS TO RIG FLOOR. BUILD SAFETY JOINT WITH CLOSED FOSV FOR UPCOMING NON-SHEARABLE OPERATIONS. 04:30 - 05:00 0.50 CLEAN P DECOMP HOLD MR TO DISCUSS TRIPPING OUT OF HOLE WITH IRON DERRICKMAN AND PRE-JOB SAFETY MEETING FOR MAKING UP BHA 05:00 - 11:30 6.50 CLEAN P DECOMP MAKEUP 8-1/2"CLEANOUT ASSEMBLY AND RUN IN HOLE TO BHA OVERALL LENGTH OF 968'MD. -8-1/2"HUGHES VM-3 MILL TOOTH BIT -8-1/2"UPPER WATERMELON MILL WITH PORTED FLOAT -JARS,(9)6-1/2"SPIRAL DRILL COLLARS,(21) JTS 4"HWDP HOLD KICK WHILE TRIPPING DRILL AND AAR WITH BUCKLER'S CREW WHILE MAKING UP DRILL COLLARS(SHEARABLES ACROSS BOP STACK) 11:30 - 17:30 6.00 CLEAN P DECOMP TRIP IN THE HOLE WITH 8-1/2"CLEANOUT ASSEMBLY, PULLING STANDS FROM DERRICK, FROM BHA AT 968'MD TO 4000' MD. CALIBRATE BLOCK WEIGHT AND TOTCO DEPTH TRACKER WHILE TRIPPING IN ON STANDS. 17:30 - 19:30 2.00 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY WHILE PICKING UP 4"DRILLPIPE SINGLES,FROM 4000'MD TO 5000'MD. 19:30 - 20:00 0.50 CLEAN P DECOMP HOLD KICK WHILE TRIPPING DRILL AND AAR WITH MASSIE CREW. ADD COMPLEXITY OF LEAKING HYDRAULIC LINE BETWEEN ACCUMULATOR AND ANNULAR PREVENTER. Printed 1/14/2013 2:22:05PM Worth America-ALASKA- BP • Page 12 • • Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 CLEAN P DECOMP CONTINUE TO RUN IN HOLE WITH 8-1/2" CLEANOUT ASSEMBLY WHILE PICKING UP 4" DRILLPIPE SINGLES, FROM 4000'MD TO 7250' MD AT MIDNIGHT. HOLD MUD PUMP LINER AND SWAB CHANGEOUT PRACTICE RUN WITH -DERRICKMAN AND ASSISTANT DRILLER TO ENSURE PROCEDURE ADEQUACY AND ALL TOOLS IN PLACE. 12/20/2012 00:00 - 03:00 3.00 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY WHILE PICKING UP 4"DRILLPIPE SINGLES, FROM 7250'MD AT MIDNIGHT TO TUBING STUB AT 8847'MD. SET DOWN WITH 5 KLBS TWICE TO CONFIRM DEPTH. PICKUP WEIGHT=190 KLBS,SLACKOFF= 154 KLBS. 03:00 - 05:00 2.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 8847'MD TO 8557' MD. MAKE THREE PASSES ACROSS EZSV SET DEPTH(8480'MD)WITH 8-1/2" WATERMELON MILL, REAMING FULL STAND FROM 8557'MD TO 8462'MD(MILL 10'BEHIND BIT);60 RPM,407 GPM,1475 PSI 05:00 - 06:30 1.50 CLEAN P - DECOMP RUN BACK IN HOLE FROM 8557'MD TO 1 :STAND ABOVE TBG STUB AT 8744'MD CIRCULATE AROUND 70 BBL HI-VIS SWEEP TO CIRCULATE HOLE CLEAN:606 GPM,2950 PSI SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN TO CONFIRM NO FLOW PRIOR TO PULLING OFF BOTTOM. WELL IS STATIC. SLOW PUMP RATES AT 8744'MD,8.5 PPG. MP#1 20 SPM=70 PSI,30 SPM= 148 PSI,40 SPM=260 PSI MP#2 20 SPM=66 PSI,30 SPM= 150 PSI,40 SPM=260 PSI 06:30 - 07:30 1.00 CLEAN P DECOMP PERFORM PRACTICE CASING PRESSURE TEST WITH DRILLPIPE IN HOLE AS TEST RUN FOR PARKER"CASING AND LINER PRESSURE TEST"PROCEDURE 07:30 - 08:00 0.50 CLEAN P DECOMP SERVICE TOP DRIVE 08:00 - 15:30 7.50 CLEAN P DECOMP PULL OUT OF THE HOLE,RACKING BACK 4" DRILLPIPE FROM 874,4'MD TO 1632'MD. 15:30 - 16:30 1.00 CLEAN P DECOMP PERFORM KICK WHILE TRIPPING(D-1)DRILL WITH MASSIE CREW AND HOLD AAR. SIGNIFICANT NUMBER OF PERSONNEL IN RELIEF POSITIONS. ADD COMPLEXITY AND DISCUSSION ABOUT ANNULAR PREVENTER NOT FUNCTING 100%DUE TO NOT FULLY PUSHING REMOTE PANEL CONTROL BUTTON. 16:30 - 17:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE, RACKING BACK 4" DRILLPIPE FROM 1632'MD TO BHA AT 968' MD. DERRICKMAN RUNNING IRON DERRICKMAN FROM DERRICK(VERSUS FROM RIG FLOOR). MONITOR WELL. WELL IS STATIC. 17:30 - 22:00 4.50 CLEAN P DECOMP TRIP IN HOLE ON 4"DRILLPIPE SINGLES WITH 8-1/2"CLEANOUT ASSEMBLY FROM 968' MD TO 3813'MD. TOTAL OF 113 STANDS OF DRILLPIPE NOW PICKED UP. Printed 1/14/2013 2:22:05PM North America -ALASKA- BP ‘" Page 13 oiNt(2— r! Operation Summary Report • Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: 'X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12:00.00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 23:00 1.00 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEANOUT ASSEMBLY FROM 3813'MD TO 3212'MD, LAYING DOWN 4"DRILLPIPE SINGLES FOR COMPETENCY TEST. 23:00 - 00:00 1.00 CLEAN P DECOMP TRIP IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY FROM 3212'MD TO 3813'MD, PICKING UP 4"DRILLPIPE SINGLES. 12/21/2012 00:00 - 02:00 2.00 CLEAN P DECOMP HOLD WELL KILL(D5)DRILL WITH BUCKLER'S CREW APPLY 400 PSI TO WELLBORE TO SIMULATE WELL INFLUX PRACTICE LINEUP AND CHOKE OPERATIONS. 02:00 - 05:30 3.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEANOUT ASSEMBLY,RACKING BACK 4"DRILLPIPE AND 4"HWDP. FLOWCHECK WELL AT BHA WELL STATIC. 05:30 - 07:30 2.00 CLEAN P DECOMP HOLD KICK WHILE TRIPPING DRILL WITH DRILL COLLARS ACROSS STACK TO PRACTICE CHANGING OUT ELEVATOR INSERTS REQUIRED FOR PICKING UP SAFETY JOINT. 07:30 - 08:30 1.00 CLEAN -P DECOMP LAYDOWN 8-1/2"CLEANOUT ASSEMBLY. 08:30 - 14:00 5.50 •DHB P DECOMP MIRU SCHLUMBERGER E-LINE UNIT. RIG UP WITH NO PRESSURE CONTROL,ONLY LINE WIPER. MAKEUP HALLIBURTON EZSV TOOLS. 14:00 - 16:30 2.50 DHB P DECOMP RUN IN HOLE WITH 9-5/8",47#HALLIBURTON EZSV ON E-LINE WITH GR/CCL TOOLS FROM SURFACE TO 8750'MD. LOG TIE-IN FROM 8750'MD TO 8650'MD. PICKUP TO 8496'MD. RIG CREW GREASE CHOKE MANIFOLD VALVES IN PREPARATION FOR BOP TEST. 16:30 - 17:00 0.50 DHB P DECOMP SET EZSV(EZ DRILL SVB SQUEEZE PACKER) WITH TOP AT 8496'MD,5'ABOVE COLLAR Al' 8501'MD AND IN COMPETENT SAND. OVERALL LENGTH OF PLUG=36". EXPECTED WINDOW DEPTHS BASED ON EZSV SET DEPTH=8476'MD-8492'MD 17:00 - 18:00 1.00 DHB P DECOMP PULL OUT OF HOLE FROM 8496'MD SETTING DEPTH TO SURFACE WITH E-LINE. 18:00 - 19:30 1.50 DHB P DECOMP CLOSE BLIND RAMS AND PRESSURE TEST 9-5/8"CASING+EZSV PLUG AT 8496'MD TO 250 PSI LOW FOR FIVE MIN,3500 PSI HIGH FOR 30 MIN(PASSING TEST,SEE ATTACHED DOCUMENTATION) APPROVAL TO PROCEED WITH OPERATIONS GRANTED BY WELLS TEAM LEADER. 19:30 - 21:00 1.50 DHB P DECOMP RDMO SCHLUMBERGER E-LINE UNIT AND CLEAR RIG FLOOR. 21:00 - 23:30 2.50 BOPSUR P DECOMP DRAIN BOP STACK. RIG UP TO PRESSURE TEST BOPE. 23:30 - 00:00 0.50 WHSUR P DECOMP PULL WEAR BUSHING. 12/22/2012 00:00 - 01:00 1.00 BOPSUR P DECOMP RUN TEST JOINT WITH 13-3/8"TEST PLUG IN HOLE. FILL BOP STACK AND SURFACE EQUIPMENT. Printed 1/14/2013 2:22.05PM •North America -ALASKA- BP Page 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: 1X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.. PARKER 273 Spud Date/Time. 11/25/1977 12:00.00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL©75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 10:00 9.00 BOPSUR P DECOMP PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. STATES RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE,JEFF JONES. -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED.ALL PASSING TESTS. -ANNULAR PREVENTER AND VBRS TESTED WITH 4"TEST JOINT -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. 10:00 - 11:00 1.00 BOPSUR P DECOMP PULL OUT AND LAYDOWN TEST JOINT WITH TEST PLUG. RIG DOWN AFTER BOPE TESTING. INSTALL WEAR RING,ID=8-7/8". 11:00 - 13:00 2.00 WHSUR P DECOMP MAKEUP 8-1/2"SIMPLE BHA AND RUN IN HOLE TO BHA OAL 939'. -8-1/2"HUGHES VM3 MILLTOOTH. -3 STANDS OF 6-1/2"DC AND 7 STANDS OF HWDP. CONDUCT KICK WHILE TRIPPING DRILL.MU SHEARABLE SAFETY JT AND RIH. 13:00 - 14:00 1.00 WHSUR P DECOMP TIH FROM 939'MD TO 2078'MD. 14:00 - 15:00 1.00 WHSUR P DECOMP PERFORM D1 KICK WHILE TRIPPING DRILL AND AAR. CRITICAL TIME RESPONSE 2MIN 50SEC. 15:00 - 18:00 3.00 WHSUR P DECOMP TRIP IN HOLE FROM 2078'MD TO 4923'MD. 18:00 - 19:00 1.00 WHSUR N RREP 8,496.00 DECOMP IADC REPORT CODE 8. REPAIR RIG. TROUBLE SHOOT IRON DERRICKMAN. SIGNAL LOST BETWEEN PLC AND IRON DERRICKMAN REPEATER. '19:00 - 22:00 3.00 WHSUR P DECOMP TRIP IN HOLE FROM 4923'MD TO 8054'MD. P/U=177K,S/O=143K. 22:00 - 00:00 2.00 WHSUR P DECOMP MAKEUP AND RUN IN HOLE WITH 9-5/8",47#, L-80 HALLIBURTON RTTS STORM PACKER WITH 6-1/4"SUB-SURFACE CONTROL VALVE ON TOP. SET AT 51'MD,5'MD BELOW WELLHEAD. LAYDOWN RUNNING JOINT. 140 KLBS STRING WEIGHT HANGING BELOW RTTS. 12/23/2012 00:00 - 01:00 1.00 WHSUR P DECOMP PRESSURE TEST HALLIBURTON RTTS STORM PACKER FROM ABOVE TO 250 PSI LOW AND 2000 PSI HIGH FOR 5 MIN EACH SPASSING TEST,SEE ATTACHED CHART). 01:00 - 02:00 1.00 WHSUR P DECOMP PULL WEAR RING AND FLOW NIPPLE. DE-ENERGIZE ACCUMULATOR. PULL MOUSEHOLE. Printed 1/14/2013 2:22.05PM ONorth America-ALASKA- BP • Page 15 Ji#44,-- Operation Sum= Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12:00.00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:00 2.00 WHSUR P DECOMP ENGAGE PULLING TOOL IN 9-5/Er PACKOFF. MARK JT AT RIG FLOOR TO MONITOR FOR CASING GROWTH. BACK OUT LOCK DOWN SCREWS.OBSERVE NO CSG GROWTH. BREAK BOP STACK AT TBG SPOOL LIFT STACK. CONTINUE TO MONITOR OPEN OA FOR NO FLOW. NO FLOW OBSERVED DURING PACKOFF CHANGEOUT. BARRIERS WHLE CHANGING OUT PACKOFF WITH STACK NIPPLED DOWN: RESERVOIR- TESTED CSG&CEMENT PLUG,TESTED EZSV,KWF,TEST STORM PACKER. OUTER ANNULUS-STATIC COLUMN OF FLUID 04:00 - 06:00 2.00 WHSUR P DECOMP PICKUP ON PACKOFF PULLING TOOL WITH TOP DRIVE&BLOCKS TO 48 KLBS(13 KLBS OVERPULL)TO UNSEAT PACKOFF AND TUBING SPOOL SET PACKOFF/SPOOL BACK DOWN ON CASING SPOOL UNLATCH PULLING TOOL FROM PACKOFF AND LAYDOWN. MOVE BOP STACK TO SIDE ON BRIDGE CRANES. PULL OLD 9-5/8"PACKOFF AND FMC 13-50 5M TUBING SPOOL AND REMOVE FROM WELLHOUSE. 06:00 - 08:00 2.00 WHSUR P DECOMP INSTALL NEW 9-5/8"GEN-1 CASING PACKOFF, AND RUN IN LOCKDOWN SCREWS 08:00 - 10:30 2.50 WHSUR P DECOMP NIPPLE UP NEW FMC 13-5/8"5M TUBING SPOOL WITH 2-1/8"OUTLETS TO CASING SPOOL. 10:30 - 11:00 0.50 WHSUR P DECOMP FMC REPRESENTATIVE PRESSURE TEST PACKOFF TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 15 MIN(PASSING TEST, SEE ATTACHED CHART). 11:00 - 13:30 2.50 BOPSUR P DECOMP NIPPLE UP 13-5/8"BOP STACK AND RISERS TO NEW TUBING SPOOL CLEAN WELLHOUSE AND BOP DECK. PRESSURE TEST BOP BREAKS TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH(PASSING TEST). 13:30 - 14:00 0.50 WHSUR P DECOMP INSTALL WEAR BUSHING,ID=8-7/8". RE-INSTALL MOUSEHOLE. 14:00 - 15:30 1.50 WHSUR P DECOMP HALLIBURTON REPRESENTATIVE ON LOCATION. RUN IN HOLE WITH FULL JOINT AND 15' PUP JOINT TO 51'MD. ENGAGE HALLIBURTON 9-5/8"RTTS CLOSE ANNULAR PREVENTER STRAIGHT PICKUP TO 176 KLBS TO RELEASE NO PRESSURE OBSERVED BELOW PKR. OPEN ANNULAR PREVENTER. LAYDOWN RTTS TOOLS. 15:30 - 18:00 2.50 WHSUR P DECOMP RIG UP TO PRESSURE TEST NEW TUBING SPOOL. CLOSE UPPER PIPE RAMS ON 4" DRILLSTRING TO TEST AGAINST UPPER RAMS, EZSV AND 9-5/8"CASING. Printed 1/14/2013 2:22.05PM 410 forth America -ALASKA BP Page 16 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:30 1.50 WHSUR P DECOMP PRESSURE TEST NEW TUBING SPOOL AND BOP BREAKS TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN(PASSING TESTS,SEE ATTACHED CHART AND CRITERIA CALCULATOR). AUTHORIZATION TO PROCEED RECEIVED FROM WELLS TEAM LEADER. UPDATE TO BARRIERS IN WELL: TESTED CSG&CEMENT PLUG,TESTED EZSV, KWF, TEST BOPE,WELLHEAD ANNULAR VALVES. 19:30 - 00:00 4.50 WHSUR P DECOMP TRIP OUT OF THE HOLE FROM 8055'MD TO 1414'MD AT MIDNIGHT, RACKING BACK 4" DRILLPIPE. 12/24/2012 00:00 - 00:30 0.50 WHSUR P DECOMP PULL OUT OF HOLE FROM 1414'MD AT MIDNIGHT TO BHA AT 940'MD. FLOW CHECK WELL AT BHA. WELL IS STATIC. 00:30 - 01:30 1.00 WHSUR . P DECOMP TRAIN ON IRON`DERRICKMAN. DISCUSS UPCOMING BHA OPERATIONS 01:30 - 08:30 7.00 WHSUR N RREP 8,946.00 j DECOMP IADC REPORT CODE 8 NPT: ATTEMPT TO TRIP OUT OF HOLE FROM BHA AT 940'MD WHILE RACKING BACK STAND OF HWDP. IRON DERRICKMAN GRIPS CENTER UPSET ON JOINT OF HWDP AND LOCKS UP. MECHANICS AND ELECTRICIANS CALLED OUT TO TROUBLESHOOT. CHANGEOUT MAGNETIC SENSOR IN DERRICKMAN POWER SHOE. 08:30 - 11:30 3.00 WHSUR P DECOMP TRIP OUT OF THE HOLE FROM BHA AT 940' MD TO SURFACE, RACKING BACK ALL 7 STANDS HWDP AND TWO STANDS OF DRILL COLLARS. LAYDOWN LAST STAND OF DRILL COLLARS AS PRACTICE. BREAK BIT AND BIT SUB. 11:30 - 12:00 0.50 WHSUR P DECOMP SERVICE TOP DRIVE AND BLOCKS 12:00 - 16:00 4.00 WHSUR P DECOMP RIG CREW WORK WITH SCHLUMBERGER TO LOAD 9-5/8"1.5°BEND MUD MOTOR INTO PIPE BARN. SUCCESSFULLY PRACTICE LOADING MOTOR ONTO PIPE SKATE, LIFTING TO RIG FLOOR AND REMOVING FROM PIPE BARN. 16:00 - 18:00 2.00 WHSUR P DECOMP MAKEUP 8-1/2"SIMPLE BHA(SAME AS BHA JUST LAID DOWN)AND RUN IN HOLE TO OVERALL LENGTH OF 940'MD. BHA PICKUP WEIGHT=75 KLBS,SLACKOFF=75 KLBS. 18:00 - 00:00 6.00 WHSUR P DECOMP UNPIN IRON DERRICKMAN AND MOVE TO STORAGE POSITION. SECURE SAME AND RUN TOP DRIVE/BLOCKS PAST SEVERAL TIMES TO CONFIRM CLEARANCE. HOLD AAR WITH RIG CREW TO DISCUSS LESSONS LEARNED AND UPDATES TO PARKER WORK SAFE PROCEDURE. 12/25/2012 00:00 - 02:00 2.00 WHSUR P DECOMP RIG UP AND SECURE DERRICK BOARD TO PRACTICE TRIPPING WITH IRON DERRICKMAN IN STORAGE POSITION. 02:00 - 03:00 1.00 WHSUR P DECOMP TRIP IN HOLE WITH 8-1/2"SIMPLE BHA FROM 940'MD TO 2457'MD,TRIPPING IN WITH STANDS FROM DERRICK, NO IRON DERRICKMAN. Printed 1/14/2013 2:22:05PM North America -ALASKA- BP • Page 172,, Operation Summa Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time: 11/25/1977 12.00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase .Description of Operations (hr) (ft) 03:00 - 03:30 0.50 WHSUR P DECOMP HOLD KICK WHILE TRIPPING(D-1)DRILL AND AFTER ACTION REVIEW. DISCUSS IMPORTANCE OF CLEAR ANNOUNCEMENTS, DILIGENCE WITH BOP OPERATIONS, PRIORITY OF SECURING WELL. 03:30 - 05:00 1.50 WHSUR P DECOMP RUN IN HOLE WITH 8-1/2"SIMPLE BHA FROM 2457'MD TO 3785'MD,TRIPPING IN WITH --STANDS FROM DERRICK, NO IRON DERRICKMAN. FLOWCHECK WELL PRIOR TO TRIPPING OUT OF HOLE. WELL IS STATIC. 05:00 - 08:00 3.00 WHSUR P DECOMP PULL OUT OF HOLE FROM 3785'MD TO 940' MD WITH 8-1/2"SIMPLE BHA,RACKING BACK 4"DRILLPIPE, NO IRON DERRICKMAN. 08:00 - 12:00 4.00 WHSUR P DECOMP TRIP IN HOLE WITH 8-1/2"SIMPLE BIT BHA FROM 940'MD TO 3121'MD, PICKING UP 4" DRILLPIPE SINGLES. TOTAL OF 136 STANDS 4"DRILLPIPE PICKED UP(12902'),SUFFICIENT QUANTITY TO TD PRODUCTION HOLE SECTION. 12:00 - 15:30 3.50 WHSUR P DECOMP TRIP IN HOLE FROM 3121'MD TO 6694'MD WITH 8-1/2"SIMPLE BHA, PULLING 4" DRILLPIPE FROM DERRICK, NO IRON DERRICKMAN. FLOW CHECK WELL FOR 10 MIN PRIOR TO PULLING OUT OF HOLE. WELL IS STATIC. 15:30 - 16:00 0.50 WHSUR P DECOMP PULL OUT OF HOLE FROM 6694'MD TO 5777' _ _ MD WITH 8-1/2"SIMPLE BHA,RACKING BACK 4"DRILLPIPE,NO IRON DERRICKMAN. 16:00 - 16:30 0.50 WHSUR P DECOMP HOLD KICK WHILE TRIPPING DRILL AND AAR WITH RIG CREW. 16:30 - 18:00 1.50 WHSUR P DECOMP MOVE IRON DERRICKMAN FROM STORAGE POSITION TO WELL CENTER FOR USE. PIN TO SECURE AND PREPARE FOR USE DURING TRIPPING. 18:00 - 00:00 6.00 WHSUR N WAIT 8,496.00 DECOMP DURING FUNCTION TEST,AFTER RE-PINNING IRON DERRICKMAN,SMALL METAL OBJECT FELL FROM DERRICK TO RIG FLOOR. SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITOR WELL. HOLD INVESTIGATION AND PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. CLEAR OTHER MATERIALS OUT OF DERRICK, RANGING FROM SCREWS TO WELDING RODS. LOAD 7"LINER INTO PIPE SHED. 12/26/2012 00:00 - 04:00 4.00 WHSUR N WAIT 8,496.00 DECOMP SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITOR WELL. PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. CLEAR OTHER MATERIALS OUT OF DERRICK, RANGING FROM SCREWS TO WELDING RODS. CLEAN PITS IN PREPARATION FOR TAKING ON 10.4 PPG LSND MUD. Printed 1/14/2013 2:22:05PM ,„ „, • • - worth America -ALASKA- BP Page 18 11.1, • Operation Summary Report Common Well Name:02-12 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: ,X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time. 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL©75.88ft(above Mean Sea Level) Date From-To Hrs Task i Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:30 0.50 WHSUR P DECOMP HOLD RIG EVACUATION DRILL WITH KING'S CREW AND AAR. RETURN TO RIG AND HOLD TABLETOP DRILL TO REVIEW PARKER WORK SAFE PROCEDURE. FUNCTION TEST ALARMS WITH PERSONNEL STAGED AROUND RIG TO DETERMINE LOCATIONS WHERE ALARM IS DIFFICULT TO HEAR(NO —SIRENS OUTSIDE RIG,ONLY GAI-TRONICS ALARM). -MOTOR ROOM,EXTERIOR FRONT SIDE OF RIG,ON TOP OF MUD MODULE. 04.30 - 06 30 2.00 WHSUR N WAIT 8,496.00 DECOMP SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITOR WELL. PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. RIG LEADERSHIP TEAM DECISIONS TO PROCEED AHEAD WITH OPERATIONS AFTER NOT FINDING ANY SOURCE OF DROPPED - OBJECT DURING DERRICK INSPECTIONS. 06:30 - 08:00 1.50 WHSUR P _ DECOMP PULL'OUT OF HOLE WITH 8-1/2"SIMPLE BHA -FROM 5777MD TO 5682'MD,RACKING BACK 4"DRILLPIPE. 08:00 - 19:00 11.00 WHSUR N RREP 8,496.00 DECOMP IADC REPORT CODE 8 NPT: TROUBLESHOOT IRON DERRICKMAN. UNABLE TO FUNCTION POWERSHOE. ELECTRICIANS DISCOVER LOOSE FITTING. TIGHTEN FITTING AND IRON DERRICKMAN BEGINS TO WORK AGAIN. 19:00 - 22:30 3.50 WHSUR P DECOMP PULL OUT OF THE HOLE FROM 5777'MD TO BHA AT 939'MD,RACKING BACK 4" DRILLPIPE. FLOWCHECK WELL AT BHA. WELL IS STATIC. 22:30 - 23:00 0.50 WHSUR P DECOMP HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL BY BLEEDING FLUID FROM INACTIVE PIT INTO TRIP TANK. SECURE WELL IN 02:45. DISCUSS LESSONS LEARNED IN AAR WITH RIG CREW. 23:00 - 00:00 1.00 WHSUR P DECOMP PULL OUT OF HOLE FROM 1414'MD TO DRILL COLLARS AT 324'MD. 12/27/2012 00:00 - 00:30 0.50 • WHSUR P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BHA FROM COLLARS AT 324'MD TO LAST STAND OF COLLARS AT 136'MD. 00:30 - 02:00 1.50 WHSUR P DECOMP HOLD KICK WHILE TRIPPING DRILL(D-1) WITH COLLARS ACROSS BOP STACK. PICKUP SAFETY JOINT WITH CLOSED FOSV AND STAB. HOLD AAR WITH RIG CREW. -BACK OUT AND LAY DOWN SAFETY JOINT TO PIPESHED. 02:00 - 03:00 1.00 WHSUR P DECOMP RACK BACK LAST STAND OF 6-1/4"STEEL SPIRAL DRILL COLLARS. BREAK 8-1/2"MILL TOOTH BIT FROM BIT SUB. **14 35-24 HR NOTIFICATION PROVIDED TO AOGCC OF PENDING BOP TEST"" ACKNOWLEDGMENT RETURNED VIA EMAIL BY AOGCC REPRESENTATIVE CHARLES SCHEVE AT 14:40 HRS 03:00 - 04:30 1.50 STWHIP P WEXIT LOAD WHIPSTOCK INTO PIPESHED,STAGE MILLING TOOLS TO THE RIG FLOOR. Printed 1/14/2013 2:22.05PM :.m ..w, d `•North America -ALASKA- BP _ Page 19 ob Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 09:30 5.00 STWHIP P WEXIT MAKEUP 9-5/8"BAKER WHIPSTOCK/MILLING BHA AND ORIENT TO MWD. -TOTAL BHA LENGTH 1038'MD. -9-5/8"BAKER GEN II WHIPSTOCK SLIDE AND ANCHOR ASSEMBLY(PINNED FOR 22 KLBS) -8-1/2"WINDOW MILL(PINNED TO WHIPSTOCK FOR 46 KLBS SHEAR OFF) -8-3/8"LOWER WATERMELON MILL,DUAL 8-1/2"UPPER WATERMELON MILLS PORTED FLOAT SUB,MWD TOOLS 09:30 - 10:30 1.00 STWHIP P WEXIT SHALLOW TEST SCHLUMBERGER MWD TOOL. -480 GPM,320 PSI TEST UNSUCCESSFUL DUE TO ELECTRICAL INTERFERENCE.REROUTE CABLE. -LEAK ON RETURN DUMP TO RESERVE PIT #3 10:30 - 12:00 1.50 STWHIP P WEXIT CONTINUE TO RIH WITH WHIPSTOCK/MILLING BHA 3 STANDS 6-1/4"STEEL COLLARS,7 STANDS 4"HWDP TO 1016'MD 12:00 - 13:30 1.50 STWHIP P WEXIT 1016'MD,MAKE UP TOP DRIVE TO EST CIRCULATION AND SHALLOW TEST MWD. ACHIEVE SUCCESSFUL MWD TEST AFTER REROUTING MWD BOOT CABLE. -550 GPM,880 PSI,130 SPM -P/U=85K, S/O=85K 13:30 - 21:30 8.00 STWHIP P WEXIT CONTINUE RIH FROM 1016'T/8438'MD. -P/U= 187K,S/O=154K FILL DP EACH 2500' -DIPLACEMENTS CORRECT,TRIP GOOD. 21:30 - 22:00 0.50 STWHIP P WEXIT MAKE UP TOP DRIVE,EST CIRCULATION. -OBTAIN SPR'S AT 8438'MD,7377'TVD WITH 8.5 PPG SEAWATER -MUD PUMP#1 AT 2 BPM=67 PSI,3 BPM= 138 PSI,4 BPM=246 PSI -MUD PUMP#2 AT 2 BPM=62 PSI,3 BPM= 137 PSI,4 BPM=240 PSI ESTABLISH CIRCULATION RATE -130 SPM,550 GPM,2350 PSI -P/U=187K,S/O=154K Printed 1/14/2013 2:22:05PM . , Worth America-ALASKA- BP • Page 20 . rimprw" Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations ' (hr) (ft) 22:00 - 00:00 2.00 STWHIP P WEXIT ORIENT TOOL FACE AT 45L,WASH DOWN FROM 8438'TO 8496'MD. -130 SPM,550 GPM,2350 PSI. -P/U= 187K, S/O= 154K. DID NOT TAG EZSV AT PROPOSED WIRELINE DEPTH 8496'MD -VERIFY PIPE COUNT IN DERRICK AND -PIPESHED ARE CORRECT,VERIFY PIPE TALLY AND BHA STRAP ARE CORRECT. NO DISCREPANCIES FOUND. -CONTINUE DOWN TO 8512', STILL NO INDICATION OF EZSV,CONSULT WITH ODE AND GAIN APPROVAL TO CONTINUE INTO HOLE TO TAG EZSV. TAG UP AT 8532'.36-FT PAST INITIAL WIRELINE MEASURMENT OF EZSV AT 8496' P/U= 187K,S/O 154K VERIFY TOOLFACE ORIENTATION 42 LEFT, SLACK OFF AND SET BOTTOM ANCHOR WITH 20K DOWN.P/U TO 190K AND CONFIRM ANCHOR IS SET.SLACK OFF TO 117K AND SHEAR OFF SLIDE WITH 45K DOWN. P/U TO VERIFY SHEARED. TOP OF WHIPSTOCK 8511'MD.7443'TVD RACK BACK STAND#80 TO 8505'MD, P/U= 183k 12/28/2012 00:00 - 01:30 1.50 STWHIP P WEXIT MAKEUP TOP DRIVE. HOLD PJSM WITH RIG TEAM AND CHM2H TRUCK DRIVERS ON UPCOMING DISPLACEMENT. -OFF LOAD SEAWATER FROM RESERVE PITS, STAGE WEIGHT UP MATERIAL IN PITS. 01:30 - 03:00 1.50 STWHIP P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER TO 10.2 PPG LSND MILLING FLUID AT TOP OF WHIPSTOCK 8511'MD.TVD 7443' -ICP 1175 PSI,450 GPM-FCP 1700 PSI,450 GPM -P/U 178K, S/O 152K. MW IN 10.2 PPG,MW OUT 10.2 PPG MONITOR WELL,STATIC 03:00 - 04:00 1.00 STWHIP P WEXIT CIRCULATE AND CONDITION MUD CONTINUE TO MOVE SEAWATER TO TRUCKS -MOVE ALL AVAILBLE MUD TO ACTIVE PIT#1 OBTAIN SPR'S 8511'MD,TVD 7443' MW 10 2 PPG -MUD PUMP#1 AT 2 BPM=320 PSI 3 BPM= 400 PSI,4 BPM=505 PSI -MUD PUMP#2 AT 2 BPM=316 PSI.3 BPM= 407 PSI,4 BPM=512 PSI 04:00 - 04:30 0.50 STWHIP P WEXIT HOLD AAR WITH RIG TEAM ON DISPLACEMENT. 04:30 - 07:00 2.50 STWHIP P WEXIT WELL KILL DRILL(D5) -SHUT IN WELL PER STANDING ORDERS TO DRILLER UTILIZING ANNULAR PREVENTER, FILL ALL LINES,GAS BUSTER AND CHOKE. -ESTABLISH SLOW CIRCULATION RATES -FOCUS ON WELL CONTROL TRAINING AND SIMULATE CHOKE BEHAVIOR. 07:00 - 07:30 0.50 STWHIP P WEXIT WEIGHT UP ACTIVE PIT TO 10.4 PPG. -BLOW DOWN CHOKE MANIFOLD. -SERVICE TOP DRIVE Printed 1/14/2013 2:22:05PM North America-ALASKA- BP g j Operation Summary Report ., Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (ft) � 07:30 - 10:00 2.50 STWHIP P WEXIT CIRCULATE AND CONDITION MUD UNTIL 10.4 PPG IN AND OUT OF HOLE. -RECIPROCATE DRILL PIPE FROM 8513'T/ 8485'MD -450 GPM,1733 PSI -P/U 175K,S/O 153K SEAQ- 10:00 - 12:00 2.00 STWHIP P WEXIT BEGIN MILLING 9-5/8"CASING WINDOW FROM 8511'TO 8513'MD 02- 12-D -500 GPM,2047 PSI ON,2014 PSI OFF -RPM 90,TRQ ON 6K,TRQ OFF 5K,WOB 1-5K -P/U 175K,S/O 153,RTW 157K -MW IN 10.4 PPG,MW OUT 10.4 PPG 12:00 - 13:30 1.50 STWHIP P WEXIT INVESTIGATE SUSPICIOUS VIBRATIONAL NOISE FROM TOP DRIVE. -MONITOR WELL,STATIC -RACK BACK ONE STAND -INSPECT AND CHECK ALL HYDRAULIC AND FLUID LEVELS IN TOP DRIVE NO ABNORMALITIES FOUND, RESUME OPERATIONS 13:30 - 21:00 7.50 STWHIP P WEXIT CONTINUE MILLING WINDOW FROM 8513'TO 8528'MD • -503 GPM,119 SPM,2040 PSI ON,2020 PSI OFF. -120 RPM,TRQ ON 6-11K,TRQ OFF 6K. -P/U 175K,S/O 153K,RTW 163K -MW IN 10.4 PPG, MW OUT 10.4 PPG **17:00-HRS:20-GAL LSND MILLING FLUID LEAK FROM PROCESS PIT INTO AGITATOR ROOM DUE TO TROUGH BEING OVERFILLED. ALL FLUD WITHIN CONFINES OF THE RIG. NECESSARY NOTIFICATION MADE. -PENDING NOTIFICATION OF BOPE TEST PROVIDED TO AOGCC AT 17:12-HRS 17:33-HRS ACKNOWLEDGMENT RETURNED VIA EMAIL BY AOGCC REPRESENTATIVE CHARLES SCHEVE WAIVING WITNESS OF BOPE TEST 21:00 - 21:30 0.50 STWHIP P WEXIT CIRCULATE 1 BOTTOMS UP TO INSPECT FLOW PADDLE. -FLOW PADDLE NOT READING PROPER RETURN FLOW PERCENT,SUSPECTED CALIBRATION ERROR. -503 GPM,119 SPM,2040 PSI. -ROTATE AND RECIPROCATE DURING CIRCULATION 120 RPM,TQ 8K -P/U 175K,S/O 153K,RTW 163K 21:30 - 00:00 2.50 STWHIP N RREP 8,528.00 WEXIT IADC REPORT CODE 8 NPT: WHILE PERFORMING INSPECTIONS AND SPCC WALK AROUND LEAK DISCOVERED. LEAK DUE TO FAILED AIR-BOOTS ON DRILLING RISER CAUSING 5-GAL DRILLING FLUID TO LEAK TO CELLAR DECK AREA.ALL FLUID WITHIN CONFINES OF THE RIG. PROPER NOTIFICATIONS MADE TO#5700 AND UNIT AREA AUTHORITY. -PJSM AND JSA WITH RIG TEAM, FOR NON-ROUTINE TASK OF CHANGING AIR-BOOTS -REMOVE FAILED AIR-BOOTS AND REPLACE WITH NEW. -MW IN 10.4 PPG,MW OUT 10.4 PPG Printed 1/14/2013 2.22:05PM *North America -ALASKA- BP Page 22 99E( Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: X3-012G3-C: (9,728,000.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: PARKER 273 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release: Rig Contractor: PARKER DRILLING CO. UWI:500292027700 Active Datum:02-12D ACTUAL @75.88ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/29/2012 00:00 - 01:00 1.00 STWHIP N RREP 8,528.00 WEXIT IADC REPORT CODE 8 NPT:CONTINUE WITH INSTALL OF NEW AIR-BOOTS IN DRILLING RISER. -MAKE UP DRILLING RISER. FILL HOLE AND INSPECT FOR LEAKS. -FINALIZE ADJUSTMENTS ON FLOW RETURN SENSOR. MW IN 10.4 PPG. MW OUT 10.4 PPG OA PRESSURE AT 05.00-HRS= 1000-PSI, BLEED DOWN TO 500-PSI 01:00 - 07:00 6.00 STWHIP P WEXIT MILL WINDOW AND DRILL NEW HOLE FROM 8528'TO 8545'MD -500 GPM,119 SPM,2130 PSI ON,2100 PSI OFF. 120 RPM,TRQ ON 6-10K,TRQ OFF 6K. -P/U 175K,S/O 153K,RTW 163K,WOB 22 8534'AND 8544'MD PUMP 40 BBL SWEEP OBSERVE AN INCREASE OF—50%METAL CUTTINGS INCREASE SEEN AT THE SHAKERS WHEN SWEEP IS AT SURFACE. -MW IN 10.4 PPG,MW OUT 10.4 PPG 07:00 - 08:30 1.50 STWHIP P WEXIT CIRCUALTE HOLE CLEAN AT 8545'MD FOR UPCOMING LOT AND POOH '-ROTATE AND RECIPROCATE THROUGHOUT CIRCULATION. -500 GPM,119 SPM,2100 PSI. -120 RPM,6K TRQ WORK THOROUGH WINDOW SEVERAL TIMES WITH AND WITHOUT PUMPS AND ROTATION VERIFY CLEAN PASSAGE THROUGH WINDOW WITHOUT OBSTRUCTIONS. -MW IN 10.4 PPG,MW OUT 10.4 PPG 08:30 - 10:00 1.50 STWHIP P WEXIT PERFORM LOT -FLOW CHECK WELL 10 MIN,(WELL STATIC). PULL INTO 9-5/8"CASING -DEPTH 8520'MD,TVD 7450' -MW 10.4 PPG IN,10.4 PPG OUT -LOT= 12.29 EMW.WITH LEAK OFF PRESSURE OF 734 PSI *AUTHORIZATION TO PROCEED RECEIVED FROM ODE* 10:00 - 12:00 2.00 STWHIP P WEXIT POOH FROM 8520'TO 6,992'MD -P/U 152K,S/O 136K 12:00 - 15:30 3.50 STWHIP P WEXIT 6992'MONITOR WELL(STATIC) - 6992'TO 4716'POOH,30 FPM MONITORING DISPLACEMENT FOR ANY DISCREPANCIES. TRIP VOLUMES CORRECT. -P/U 156K,S/0 135K -MW 10.4 PPG IN,10.4 PPG OUT. 15:30 - 17:00 1.50 STWHIP P WEXIT 4716'MONITOR WELL(STATIC)CIRCULATE 1 BOTTOMS UP -70 SPM,296 GPM,600 PSI -RECIPROCATE 30 RPM,2K TRQ -P/U 130K,S/O 118K,RTW 123K 17:00 - 21:00 4.00 STWHIP P WEXIT MONITOR WELL(STATIC)CONTINUE TO POOH FROM 4716'TO 2629'MD P/U 120K,5/0 105K Printed 1/14/2013 2:22:05PM 1WELLHEAD= FMC 02-12C S ORIGINAL,"A"8"13"W ELLBORE'S NOT 385 ' ACTUATOR= BAKER C SHOWN BELOW 3-3/16"WHIPSTOCK'** INITIAL KB.1 E 56.0' SUSPENDED BF. ELEV= ...........11 _I 2362' –{95/8"FO CEMENTER KOP= 3100' 20"CONDUCTOR, – 80' Max Angle= 94°@ 11275' 94#,H-40, ....----H 2490' –95/8"FO CEMENTER Datum MD= 10192' Datum TVD= 8800'SS ID=19.124' x 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT 2386" 13-3/8"CSG,72#,N-80 BUTT,ID=12.347" 2702' 884T -JET CUT TBG(10/18/12) , 9000' H EST TOP OF CEMENT IN TBG(10/12/12) 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD 7793' I &MI 9093' I EST TOP OF CEMENT IN IA(10/12/12) 9-5/8"WHIPSTOCK(12/27/12) 8511' �l 9425' –15-1/2"OT1S SLIDING SLV,ID=4.562" ricEZSV(12/27/12) H 8532' 4. *. 9 ' 9511' –5-1/2"OTB XN NIP,ID=4.455" (WASHED OUT 09/04/11) Minimum ID = 1"78" @ 9684' .* : 9544' --I5-1/2"BKR SBR EXTENSION,ID=? k. .a': MILLED OUT ALUMINUM BUSHING IN ►j`■ ■, ' 9599' –19-5/8"X 5-1/2"BKR SABPKR,D=4.875" DEPLOYMENT SLEEVE km9605' —16'BKR MILLOUT EXTENSION,ID=? 4 i ii ti fl4ti ON I °'— `------• 9611' –16-5/8"X 4-1/2"XO,ID=3.958" 5-112"TBG,17#,N-80 AB-MOD, –i 9544' rill I 9668' –13.70-BKR DEROY SLV,D=3.00" .0232 bpf,D=4.892" 9672' –14-1/2"OTIS XN NIP MLLED TO 3.80"(06/13/07) TBG PUNCH,4 SPF(10/01/12) H 9587• -9592' 9674' -3"DEPLOY SLV,ID=1.78" 3.77"VVPR w/DPU(09104111) H 9638'SLM II I I (ALUMINUM BUSHNG @ 9284' MILLED OUT) TOP OF CBvIENT(06/21/07) H 9726` 9726' –13-1/2"BOT LNR DEPLOY SLV,ID=3.00" ci 41 10 i $1 9731' –13-1/2"STL PIN,D=2.992" 1 I' i�1 9745' -- 3-1/2'HOWCO X NIP,ID=2.813" 3-1/2"LNR 9.3#,L-80 STL,.0087 bpf,ID=2.992" –{ 9778' – ►�� 4t 9778' –I3-112"X 3-3/16"XO,D=2.786" BEHIND 41 4 i} 4 9816' H4-1/2"SHEAROUTSUB,D=? CT LINER 4 TOP OF CEM NT 9-5/8"CSG H 9810' 'ill 49817' H4-1/2"WLEG,ID=3.956" 41 4 4-1/2"TBG,12.6#,N-80 BUTT, –{ 9817' �'•4 •r:• 9800' –{ELMD TT LOGGl3?12/28/77 ♦•4 ♦•♦ .0152 bpf,ID=3.958" �•�•�4 •�••• :44, 1.0. 9-5/8"MILLOUT WINDOW(02-12B) 9848'-9855' 9-5/8"CSG,47#,J&L-95 HARD, D=8.681" H –9855 I— •••�• • 3-3/16"WI-IPSTOCK(TAGGED 04/09/11) –1 10132' \ 2.74"MLLOUT WE IDOW(02-12C) 10131'-10135' I 10205' –JET CUT(04/23/11) 10435' –JET CUT(04122111) "•'i PBTD H 10540' o. ♦4 2-3/8"LNR,4.64,L-80 STL,.0039 bpf,ID=1.920" - 12568' •4 • ♦• DATE REV BY COM48'ITS DATE REV BY COMVDYTS PRUDHOE BAY TMST 12/30/77 PKR 141 ORIGINAL COMPLETION 11/11/12 PJC DRLG PREP CORRECTIONS WELL: 02-12C 11/15/95 N3S CTD SIDETRACK(02-12A) 01/17/13 JR/JMD PULL TBG,SET EZSV/I/VS(12/16-27/1 ', FERMI No: '2110250 06/22/07 N4ES CTD SIDETRACK(02-12B) API No: 50-029-20277-03 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) SEC 36,T11 N,R14E,804'FNL&894'FW.. 10/14/12 RMI/PJC P&A(10/12/12) ' ' 10/26/12 RWM/JM3 JET CUT TBG(10/18112) BP Exploration(Alaska) NN M N �i SEAN PARNELL,GOVERNOR " Mc p ' ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COM IISSION ® ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. ,, O�-`5. P.O. Box 196612 .)-s\ Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-12C Sundry Number: 312-283 Dear Mr. Egbejimba: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P Foerster Chair DATED this 3 day of August, 2012. Encl. STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROV4A/ 4'1: L. 5jo1z 20 AAC 25.280 (73 31 i 1. Type of Request: D P OGCC ❑Abandon ®Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Change Approved Program 0 Suspend 0 Plug Perforations 0 Perforate 0 Pull Tubing 0 Time Extension 0 Operations Shutdown ["Re-Enter Suspended Well 0 Stimulate 0 Alter Casing 0 Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development 0 Exploratory 211-025 • 3. Address: 0 Service 0 Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-20277-03-00 - 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 02-12C . Spacing Exception Required? 0 Yes ®No 9. Property Designation: 10. Field/Pool(s): ADL 028308&028326 Prudhoe Bay Field/Prudhoe Bay Oil Pool - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 12598' - 9033' - 10540' 9000' 9638' None Casing Length Size _ MD TVD Burst Collapse Structural Conductor 109' 20" 109' 109' 1530 520 Surface 2702' 13-3/8" 2702' 2702' 4930 2670 Intermediate 9848' 9-5/8" 9848' 8577' 6870 4760 Production Liner 405' 3-1/2"x 3-3/16 9726'- 10131' 8469'-8806' 10160 10530 Liner 2900' 2-3/8" 9668'- 12568' 8418'-9034' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10830'- 11080' 9014'-9011' 5-1/2", 17# N-80 9612' Packers and SSSV Type: 9-5/8"x 5-1/2"BKR SAB Packer Packers and SSSV 9599'/8358' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch r 0 Detailed Operations Program 0 Exploratory ®Development 0 Service 0 Str 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: August 15,2012 0 Oil 0 WINJ 0 WDSPL 0 Plugged 16. Verbal Approval: Date: 0 Gas 0 GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG ®Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact John Rose,564-5271 Printed Name John Egbejimba Title Engineering Team Leader Prepared By Name/NumberSignature - '/ -ZI Pone 564-5859 Date 7 /2 Joe Lastufka,564-4091 Commission Use Only Conditions of approva• otify Commission so that a representative may witness 21^L,^Q► Sundry Number: �1 (, o 11/Plug Integrity BOP Test 0 Mechanical Integrity Test 0 Location Clearance k35 bo P.5L 5 0 l 7sCif Other: - 2-O A.0 Z -• 112' 1 Z (l') Al �„ p/�_i P face r 9 /e---a -' Subsequent Form Required: /6—y07 APPROVED BY e -3 Approved By: • / / P)k...4,71-4..------ COMMISSIONER THE COMMISSION Date ', Z' Form 10-403 Revi ed 0/2010 Submit In Duplicate •� RBDNIS AUG 0 6 201 R I 0 I NAL gZ-it- 1/319:5j GP 0 bp 140,11 Well Name: 02-12C Well Type: Producer Current Status: Shut-In Request: P&A—Well Prep f/Rotary Sidetrack MIT—IA- passed to 3000 psi (03/05/11) MIT-T—pass to 3000 psi w/TTP at 9655' MD (09/04/11) Well History: 02-12C is a CST drilled and completed in April 2011. The lateral was drilled in good quality Zn 1B sand and the liner was successfully run to TD. Unfortunately, the cement job failed. The liner wiper plug stuck in the liner at—10540', leaving cement inside the liner and preventing liner access past that point. Without access to the liner, it could not be logged or perforated. In hopes of re-sidetracking to the Zn 1B target, two liner cut&pulls were attempted (cuts at 10205' and 10435') but the liner could not be pulled out of hole. The rig left location on 4/26/11. The well never perforated or produced. Reason for P&A/RST: As the 02-12C well was a failed CST, the well needs to be P&A'ed in preparation for the planned 02-12D RST. The proposed sidetrack is a 2,000' horizontal Ivishak Zone 1 B/2A producer, , which will replace the 02-12C CST and access additional Zone 16/2A reserves in southeastern DS 02. The parent well (02-12C) is a failed CST without access to the liner and can no longer be coil sidetracked. The proposed sidetrack will provide offtake in —50 acre drainage area in western DS 02 and restore wellbore integrity. Other Requests: None. Scope Planned Sundry Work: As currently planned, the P&A of the 02-12C well and the well work in preparation for the 02-15D rotary sidetrack will be as follows: 1. As pre-rig work; a. place a —500' cement plug on both sides of the tubing from —9638' MD (est. TOC at 9138' MD). b. make a tubing cut at 8800' MD. 2. With the drilling rig on the well; a. pull the 4-1/2"tubing from 8800' MD. b. Clean-out the well to the top of the tubing stub at 8800' MD. c. Set an EZSV at—8496' MD and test. d. Run 9-5/8"whipstock and set on the EZSV at—8496' MD. e. Change-out tubing spool and 9-5/8" pack-off. MASP: 3235 psi @ 8211' TVDss (9.5 ppg pore pressure at TPTR) Estimated Pre-Rig Start Date: 08/15/12 02-12C Sundry Application 1 7/24/2012 Proposed Pre-rig prep work: 1. MIT-T to 3000 psi. MIT-IA to 3500 psi. MIT-OA to 2000 psi. 2. Perform a tubing punch just above the existing production packer at 9599' MD (tubing punch at —9540' MD)to allow fluid circulation to the IA at that depth and circulate the well to clean seawater on both sides of the tubing. 3. Place 500' cement plug from the top of the bridge plug at 9638' MD (on both sides of the tubing above the production packer at 9599'' MD). (-35 bbls of 15.8 ppg G cement. Est TOC at 9138' MD.) 4. PT cement to 2500 psi. tr.�iu-r-��30•�•.-••. 5. D&T cement/drift for jet cut on tubin . 6. Jet cut the 5-1/2"tubing at 8800' MD and freeze protect both sides of the tubing with diesel to 2000' MD. 7. CMIT-TXIA to 3500 psi. 8. PPPOT-T and IC. Function LDS. 9. Set BPV and test. Planned Rig Work: 1. MI/RU/confirm barriers. atiti.273 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high. 3. RU and pull the 5-1/2", 17#tubing from the pre-rig jet cut at—8800' MD. 4. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8"casing to top tubing stub at—8800' MD. 5. RU E-line and RIH w USIT / CCL / GR to 9000' and log to surface to determine TOC behind the 9-5/8" casing in the 12-1/4" open-hole (if any) and in the 13-3/8"x 9-5/8" OA(est. TOC —2250' MD). 6. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at —8496' MD (competent sand / confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 7. Pressure test the EZSV to 3500 psi for 30 minutes and chart. 8. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 9. Hang the milling BHA on a storm packer and change-out the tubing spool and the 9-5/8" pack-off. Drilling Engineer: John Rose (907) 564-5271 Production Engineer: Alice Kaminski (907) 564-5676 Geologist: Ben Siks (907) 564-4502 I coocu(f . (uittrr wt ff)OIC if a f,,'4 d f. fzk 4m► r4vs Ile welt w�r�h /Id Offlnr Ver414441 Va/Ve' .01 °42.- 02-12C Sundry Application 2 7/24/2012 TRIS= FLK SAFETY NOTES:"WELL ANGLE>7 D'.:-g?103 8 5' 1NELLt3 A D= FLK I 2 1 "'ORGNAL,"A"8"B"WELLBORE'S NOT AcruArof BAC56.0'l KB.ELEV= 4SUSPENDED SHOWN BELOW 3-3/16"WHIP STOCK'.. IBP lig/= Il KO' 3100' l� _ .,_-.{ 2218 1-15 117 OTTS ROM SSW tom,to.4.567 1 Max A" e= 94'@ 11275' 20 cow jam 1 80' Data",MD= 10192' 940,H-40, — -1 2362' I-19.5/8"FOC 1fB3' J bawl TVD= 88W SSID := _' — ==. I 2490' H961-FO CEMENTER I 19-5,8"CSG,470,J&L-415-SOFT XO TO N-8.'J:.J1--) 2386' il ... 1 13-3V CSG,7220,N-80 BUTT,D=12347 -I 2702' I, _-j 9425' H.,_,,2.0115 SLUNG SLY,o=4. ' I 19-5/8' :SC,470,N-80 Burr XO TO J&: :-Hz.j:._ 7793' 9511 S 12^ons XN NP,D= ASb' Minimum ID=1.78"@ 96$4' , ' WASHB1Ot109104111) MILLED OUT ALUMINUM BUSHING IN 9544' HS1JrB8tRSEM ExTENSON,D DEPLOYMENT SLEEVE 1 1 -- . 9599' I—{9-518*x5-1;2-Bay SABPKR,ID=4.n "'!` 5.112`7BG,174e,N-8048-f.NJ1--1. 9588' rte'l �[ _ + 9605 1 Hf6`wiz mica DCTENS)84 D='> I .0232 Opt D=4692" _,.... -01 - -{ 9611' H6-58"X4-1:2'Xgo=3.958" I (3.77'INFR w,DPU(09;(.4,' 9638'S LM I I 9668' H3.70-BKR DEPLOY SLY,ID=3.00' I T i I 9672' H4-1.2'OTB XN NP LCL®TD 3.187'1.0SH3�i07d 9674' 3'DEPLOY SLY,D=1.78," ' (ALUMINUMTUSMINGit9284' MILLED OUT) ITOPOF CEMENT 06/21F0T 1-1 9726' I 9726' H'_'.-'/r BOT L4R DEPLOY SL'.',ID=3.'X'I 4I q I 9731' H....._-z'STL FIN,D=2.992" I op 4j 9745' :3-1:�Fk7W:'�XNI,D=2,613'1 13-172"LIP;9.3rff,1-80 STL,.0387 tuff,D=2.9912' 11 9778' •0 - ,4 --A 9778' 11.3-",'Z'X3-3/16'xv,D=2.786' I BEH ND 9816' 1_14-1:2"SFEA f OtJT SLD.D=? I DT LINER I TOPOF CEMENT 9-&S"c&j--1 9819' I._ 99817' Hater wird:,D=3.955^I il 4112"180,12.018,N-80 BUT'' -1 9817 .P '•, $4.6. 9800' )TT LOGG1226r77 .iIP* •••+ .0152Opt D=3.958' ••ar ♦••• • 44 ••• .•• •••••+ •. •` 9-5/8'LpL_:5u r Jv I!&Jc',W(02-128) SW'-9655• I9d68'CSC 4"a ,IS-- -IARLI a=8.66',' J-- -9855 •�••, 31b WHIPSTOCx ;yC TA - C,4O: ^'' H 10132' �� -31I.\\' PERFORATION SIJLbW RY 1 2.:14'4.E LOUT WINDOW DOW(02-12C) 10131'-10135' RI+LOG. ANGLE AT TOP PERF. ' Note.Rolm'to Prom-two-.DB for ntsIonca pert eta SIZE SPF NTERVAL Cp4v'Stg DATE 1020S 11JET WY(0423611) — I 10435' HJET Cur(04,(2261,) V' ,,,2TT} 10540' I • 12.308'ua1,4.644,_- -. '_. _ - n f,D=1.923' 12568' •• 1►. JA:E REV`BY COMMENTS _ = tt-+' COMMENTS '1iLIDH E BAY UNIT 12/30177 PKR 141 ORIGINAL COM PL ETC N - • JUPJC H',.-..-DRLOCC :.....4 AEU:02-12C 11!15/95 N3S CTDSIDETRACK(02-1241 ::M" _JF,r'J::: 5E1 WRP(09N0411) PH714ITNo.//110250 06122107 N4 ES CT DSIDETRAC K(02-128) API No:50-029-202 77-03 04726/11 NORDIC 1 SUSPENDED 010(02-12C) :.b.. o,r1 IN,R14E,804'FNL8894'FAIL 05105;'' ':r':: _br ,,-IA.FT OORRECDONS 05/24: ' 4 YL _.t•__M- ,(-TOORRECTDNIS 8PExpIoratIan(Alaska) 02-12C Sundry Application 3 7/24/2012 IHEE= FMC SAFETY NOTES:"WELL ANGLE>70'!I0385' 1M1ELLFEAO= 02-12C "'ORIGINAL,"A"&"B"WR 1 R)RES NOT ACUAICR= BAKER► SHOWN BELOW 3-3116"WHIPSTOCK*" KB ELEV* 56.0 SUSPENDED f P&A'ed BF e.E{I. � I KOP= 3100' 2218' H5-112"0719 ROM SSSV NNP D=4.462' MM A16118=_94'@ 11275 20'COp OR J 90' Mora80= 10192 9441,FMO, t - I 2342' H96/B'FO C EMEME i 2...0 Glum ND + D=19.124' i'ci ••••-•--1 2400' H95/8"MICEMENTER I 19-518'CSG,47s,AL-95-30E7%0 To N-40 BUTT H 23W _......„6. 5-1/2"Tubing Cut at 8800' 113.3fi'CSG.Tae,P1.80 BUTT,ID=12.94r H 270r . TOC--91(338'MD ' ' '.'', 8 9425' Hsln•OTISSL0/A0Sly,ID*4387' I 9.4M'CSG,470,1400 Bo BUTT X070 AL-9SFMRD I--I 7713' 1 • 0511' I-5112'CMSXNPP,D=4455 •„1 « •.! MAMBO OUT 09104/11) TOC on 9-5/8"Csg-8980'MD a N a • 9644• H5.12'MR SBR EkT NSIDP1 D=1 I tubing punch at-9540'MD—4 • '• 9699' H9-sir x 5.1?BFOZ SAB ROI,D.4.87V I 1 5-1/2^TBG,171.t4-80 AB-MOO, 084'MOO, - 9 1./R. . • _--i 9606" 1-18'BKR moot T EXTENSION,D.? .0232 bp'.D=4 892' ° ~- 9611' -(6.518'x4.1!2")OD,o=3.956'I 13 77 WPR w/OPV 409/04!11) H 0834 sL M 1 ' I 9668' 113.70'BKR DB'LOY SI-V,D=3 00' 4 9672' -(4.11?OM XN NP MLLED TO 3.00'(06/13!07) I 0 1 ... 9674`' 3'UB�LOY SLV,D=1.78" ' (ALI.UTAUMa15HINGCI)I 4 MILLED OUT) Ira.0Fcaderr(ow l/07) -j 9724 ' 1.— 9726 I--131? DC PLOY 300'1 1 4 ,.�.. • I 9731' 7-{3./?SIL FMO=2.992- ---_ . is *1 I 9745' H3-1/2'HDWCOX1.1P,D=2a1ki 3-112'LAR,9.30,L-80 SIL,,0087 bpl.0*2.992' 8778' r 1 « 4 -i 9778' 3-V2"X3-3/18'X0,43=2.786'I BEHIND ,'4 9016-7-1-14-1/2"staoursus,D=? I CT LINER [TOPOFm9-518'CSG H 4810' L. y mato 9-518' I 98ir H4-12-ALM,D,3.958'I 4-1/2'1AG,12,6R.PF80 BUTT, 0617 .;. ::, . :r4isi4' I 9000' Ha n L000®12R8?7 I 44444 j x44444 -0152 bpf.D=3958' 44444, X9944 4444' .:4j4:- -.-_ 44441 ,44• 44444. 9-5/8'MUGU7 WINDOW(02-12M 9848'-9855. 19.5/8'C9G.478.J81:96IMFND O=8.681' I-�65 TOC on 2-7/8"liner at-9852'MD I3-3h18"webs TOOK/TAGGED WW1 11 J-$ 10132' }� FERF0RATION SIII/MRI \� REF LOG: 274'MLLOUT IM/DOW(02-12C) 10131'-10135' ANGLE AT TOP FEW'fp' Role Refer 10 Ftoduction DB for hstorical peri date WE SPF WIB3VAL OprY'qz DATE I 10206' HJErOI)T(o4r23H1)I I 10435' HJETCUT(04/22/11)I 4V MID 10541• NOTE: v. :..4` ' TPUT-9495'MD I2-318"LAR 4.BN.L-90 STI,.0099 apt,D=1.920" 12588' ii BPUT-9506'MD Vt TSAG-9667'MD DATE REV BY (flP i NTS DTE REV BY COMENTS FRUCl/43EBAY UHT '12/30!77 PI02141'ORIGINAL COMPLETION 06/01/11 JL/RIC RAL CMG CORRECTIONS VIELL02-12C 11/15/95 Nis CTDSITETRACK(02-12A) 09/17/11 GIF/RIC SET 1MIP(09O4/11) FERN No:"2110250 1 06/22107 N4e3 CTD SIDETRACK(02-1281 7/24/12 (pr RoposedF6A AR No:50-02910277-03 — 04/26/11 NORDIC 1 SUSPENDED CID(02.12C) SEC 36,TI1R R14E 804'FNL 3 894'FWL 05/05d 11I DRLG DRAFT CORRECTIONS05/29111 I' PJC 13F1G CRAFTCORREZDONS BP 0giloration(Alaska) 1 02-12C Sundry Application 4 7/24/2012 Rose, John G (ASRC) From: Sidoti, Todd Sent: Tuesday, July 17, 2012 1:53 PM To: Rose, John G (ASRC) Subject: DS 02-12 Cement Evaluation John, From the CBL data that I was able to look at from 8950'—9850' it is evident that cement is located behind pipe up to at least 8980'. I am not able to determine the quality of the cement due to the very high possibility that a microanulus is present and affecting the CBL response. From the VDL measurement it is evident that there is cement in place between the Sag and Put River and above to at least 8980'.Any attempt to further improve the quality of cement through additional squeezes would most likely be impossible. Let me know if you have any questions. Thanks, Todd Todd Sidoti I BPXA Well Intervention Engineer I Dir 907-564-5113 I Cell 907-632-4113 I todd.sidoti@bp.com 1 Page 1 of 1 Subject: FW: INTENT PLUG for RE-DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE-DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE-DRILL WELLS (IPBRD)Type Work Code in RBDMS 1. When a Form 10-403 is submitted requesting approval to plug a well for redrill,the initial reviewer(Art or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked,we will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2. On the Form 10-403 if"Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve / D. will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10-403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10-407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill"code, and cannot find any evidence that a subsequent re-drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10-407. Steve will also change the status on the 10-407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10-407 into RBDMS. 5. When the Form 10-407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July,Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file://F:\Daily_Document_Record\Procedures_Instructions\FW INTENT PLUG for RE-DRI... 4/6/2012 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 07/02/11 Inspector: Matt Herrera Operator: BPXA Well Name: PBU 02-12C - Oper.Rep: Jon Arend PTD No.: 2110250 Oper.Phone: 907-659-5766 Location Verified? Yes Oper.Email: areni2t bo.com If Verified,How? LAT/LONG Onshore/Offshore: Onshore Suspension Date: 04/26/11 Date AOGCC Notified: 06/29/11 Sundry No.: Well Completion Rpt Type of Inspection: Initial " Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing 70 - Photos Taken? Yes IA 0 " OA 0 Condition of Wellhead: Good,clean with no leaks. No liner in cellar but clean. All gauges on tree operational. Condition of Surrounding Surface Location: Good,clean with no subsidence.Flowlines disconnected and blinded. Well sign on well house. Follow Up Actions Needed: Operations get regular annulus readings and perform regular visual inspections. Comments: None Attachments: Photos(2) — REVIEWED BY: Insp.Supry 532 )1(Z7/// Comm PLB 11/2011 2011-0702_Suspend_PBU_02-12C_mh.xls • I z Y I Bi. .-,2 • N G5 U S 0 - W N Z N O 1 S= = 2M._ 0 aWI N i Ilum O4: 6 S rt- O Oa, � C`� ip k SS m w woo m. -ii- p 0< CL 4 tE O �g?PP a soca 8,28 8 `8Z X'b'b' �5$ 05 S —Utz6 W O j 2 2 'R. NM t R: r aR gross S—c S JNA mn'T' a' b"v$i vii= "AA oX �n? n � i N .v. s xi t2t2S< Q'_',2x 2 H n n JSS 3 1 v w a 8 8 8 ; lgaa 1-71 - _ 1...1a 11 1I1 I I 1' I 1 I 1 1 I $Q $m EIH > • € I zo 11 _ _ — — __ __ �� 11 i— — - - - - — 55 55 <cc6--� �� =8AA a •—„ ' �� [r ;_ i i 1 . i..,. ,. l s i W II Ci ..dh i Limo ;inu—: s = 8 s R III ;I.I I $QQQ<1Q®4®© q I ! I s a 11-443-2 i, NN-r 1 I t b s a 1 I I I I r < i ylgfkbilf , I I 1 1 8< §s% a=6i1a II _ — —i—_1.. i —. - - — 9 Vy, , 1.11. .1 , a sg 61 I---1 1 iWf $ I I mow$ Fi 2 «rs 0Ilk . a ...i_.-.-{1— 1 Wwab 6fi^<'S'ai.,,,a9p I I I ---._- ._ . -.1— — —'_ _:_._.. v<o� g _8e as�3 11/ +� XALI B a 0 ce ~OU — K a n 6 g mm > < v H 0 $ EI v > v Y.r w6 U .ie 3 S.m. WCC O V�x 5 5 2 2 X DIANA Z. 7meo1. 'a g,.n n Suspended Well Inspection— PBU 02-12C PTD 2110250 Photo by AOGCC Inspector M. Herrera ARCO Alaska, Inc- „ Subsidiary of AtlanticRichfheldCo p Y Prudhoe Bay Unit -Weil # 2 - 12 SL 804 ' S & 894 ' E of NW CR Sec.36 -T11 N -R14E -UM BHL 1286 ' N & 1714' W of SE • Sec.36-T11 N - R14E - UM State Lse. # ADL 28308 Drilling Permit # 77 - 21 APL 50-029-20277 ^ �4 • iT r v u d 1 PBU 02-12C Suspended Well Inspection 7-2-11 mh 1 • STATE OF ALASKA ALASKA l.._AND GAS CONSERVATION COMMISSIO,, REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulates Other Q REPORT OF Performed: Alter Casing ❑ Pull Tubing❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ INSPECTION Change Approved Program ❑ Operat.Shutdown❑ Perforate ❑ Re-enter Suspended Well 0 2.Operator BP Exploration(Alaska),Inc. 4.Well Class Before Work: 5.Permit to Drill Number: Name: Development Q Exploratory 0 '211-0250 3.Address: P.O.Box 196612 Stratigraphic Service ❑ 6.API Number: Anchorage,AK 99519-6612 ''50-029-20277-03-00 8.Property Designation(Lease Number): , 9.Well Name and Number: ` ADLO-028308,028326 PBU 02-12C 10.Field/Pool(s): PRUDHOE BAY FIELD/PRUDHOE OIL POOL 11.Present Well Condition Summary: Total Depth measured 12598 feet Plugs(measured) None feet true vertical 9033.32 feet Junk(measured) None feet Effective Depth measured 10540 feet Packer(measured) 9599 9720 feet true vertical 9000.13 feet (true vertical) 8358 8464 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"94#H-40 29 - 109 29 - 109 1530 520 Surface 2675' 13-3/8"72#N-80 27 - 2702 27 - 2702 4930 2670 Production 9831' 9-5/8"47#J&L 95/N-80 24 - 9855 24 - 8583 Liner 52' 3-1/2"9.3#L-80 9726 - 9778 8469 - 8515 10160 10530 Liner 357' 3-3/16"6.2#L-80 9778 - 10135 8515 - 8809 Liner 2900' 2-3/8"4.6#L-80 9668 - 12568 8429 - 9034 Perforation depth: Measured depth: NONE- _ _- True Vertical depth: _ _- Tubing:(size,grade,measured and true vertical depth) 5-1/2"17# NN=80 23-9612 23-8369 4-1/2"12.6# N-80 9612-9817 8369-8550 Packers and SSSV(type,measured and true vertical depth) 5-1/2"Baker SAB Packer 9599 8358 4-1/2"KB Packer 9720 8464 12.Stimulation or cement squeeze summary: !i (11 Intervals treated(measured): Aiai;1•1 C� & (i:v CAW. C ii1i111SS1011 Treatment descriptions including volumes used and final pressure: fIrjr,PriAS 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SUSPENDED Subsequent to operation: 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory Development Q Service ❑ Stratigraphic 0 Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE] GINJ ❑ SUSPQ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: NA Contact Joe Lastufka Printed Name J e Lastufk Title Petrotechnical Data Technologist Signatur V.------• Phone 564-4091 Date 7/23/2011 ROOMS JUL 25 Z0� 7 Z '•!r Form 10-404 Revised 10/2010 <' Submit Original Only ter// Prudhoe Bay Unit Well DS2-12C, PTD 211-025 Suspended Well Inspection Report BP Exploration(Alaska) Inc. (BPXA) completed a suspended well inspection of PBU DS2-12C on 07/02/2011. The following attachments document the inspection and the current condition of the well (reference 20 AAC 250.110 (e) and (f). • Suspended Well Site Inspection Form, documents the well pressures and site condition. AOGCC inspector Matt Herrera witnessed the inspection. • Wellbore diagram illustrating the current configuration of the well • Pad map showing the well location and other wells within one-quarter mile radius of the surface location • Area photograph of pad and surrounding area • Photographs showing the condition of the wellhead, tree and the surrounding location Additional Pertinent Information: • PBU DS2-12C was suspended 04/26/2011 after liner cementing problems. Two attempts to cut and pull the liner were unsuccessful. • Well has potential for another future sidetrack. • PBU DS2-12C is located on a pad with active producing wells and/or service wells. • The strata through which the well was drilled is neither abnormally geo-pressured or depleted. • The wellhead and tree are in good condition • A plug will be placed in the tubing for an additional barrier. MJL 07 Jul 2011 Suspended Weil Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name DS2-12 Field/Pool: Prudhoe Bay/PBU Permit#(PTD): 211-025 API Number: 500292027703 Operator: BP EXPLORATION(ALASKA)INC Date Suspended: 4/26/11 Surface Location: Section: 36 Twsp: 11N Range: 14E Nearest active pad or road: Drillsite 2 Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges. fittings,tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration,fluids or sheens visible on the ground or in any nearby water, 2)photographs showing the condition of the location surrounding the well General location condition: Good Pad or location surface: Good Location cleanup needed: None Pits condition: Good Clean Surrounding area condition: Good Water/fluids on pad: None Discoloration.Sheens on pad,pits or water None Samples taken: None Access road condition: Good Photographs taken(#and description): (2)Wellhouse front and surround, Wellhouse back and surround Condition of Wellhead AOGCC requires: 1)a description of the condition of the wellhead,2)well pressure readings,where practicable, 3)photographs showing the wellhead condition Wellhead/tree/valve description,condition: FMC Wellhoead, FMC Tree Cellar description, condition, fluids: Good, Clean Dry gravel Rat Hole: None Wellhouse or protective barriers:Wellhouse Well identification sign: Yes Tubing Pressure(or casing if no tubing): 70 psi Annulus pressures: IA-0 psi,OA-psi Wellhead Photos taken(#and description): (2)Wellhead,Tree Work Required: None Operator Rep(name and signature): Gerald Murphy • ° `���f�— AOGCC Inspector: Matt Herrera Other Observers` Jeoraikrebd Inspection Date: 7/2/2011 AOGCC Notice Date: 6/26/2011 Time of arrival: 10:30 AM Time of Departure: 10:50 AM Site access method:Truck FMC WELL WELLHEAD= FMC 02-12C sAORIGINAL""A"&" B WELCL10385' BORES NOT ACTUATOR= BAKER C ®� SHOW N BELOW 3-3116"WHIPSTOCK - KB ELEV= 56.0' BF ELEV= I KOP= 3100' 2218' --I5-1/2"OTIS ROM SSSV NP.ID=4.562" I Max Angle= 4'@ 11275' 20"CONDUCTOR. 80' Datum MD= 10192' 94#,H-40, 2362' H95/8"FO CEMENTER I Datum TVD= 8800'SS ),.<ID=19.124' f 2490' —195/8"FO CEMENTER 9-5/8"CSG,474.J&L-95-SOFT XO TO N-80 BUTT — 2386' 13-318"CSG.724,N-80 BUTT,ID=12.347" —$ 2702' x 9425' —I5-112"OTIS SLONG SLV.D=4.562" 9-518"CSG,47#,N-80 BUTT XO TO J&L-95-HARD — 7793' 9511' —I5-112"OTIS XN NP,ID=4.455" m 5-1/2"TBG,17#,N-80 AB-MOD, — 9588' I-- 9544' 5-'112"8KR SBR EXTENS ON,ID='? .0232 bpf,ID=4.892" I 9599' 9-5/8"X 5-112"BKR SAB FKR,ID=': 4.875" X � 960$' �6'BKR MILLOUT EXTENSION,8I D=? I Minimum ID =1.78"@ 9684' 9611' —I6-5/8"x4-1/2"XO.ID=3.958" MILLED OUT ALUMINUM BUSHING IN 1,....._:,4 9668' 1—3.70"BKR DEPLOY SLV.ID=3.00" I DEPLOYMENT SLEEVE 9672' —14-1/2'OTISXNNP MILLED TO 3.80"(06/13107) 1 H 9674' —3"DEPLOY SLV,ID=1 78" TOP OFCEMENT(06/21/07) 9726' 1 ' (ALUMINUM BUSHING @ 9284' MILLED OUT) 9726' -i3-1!2 "BOT LNR DEPLOY SLV.0=3.00" I 1: 9731' —13-1/2"STL PIN.0=2.992" I 4' 9745' --I3-1/2"HOWCO X NIP,ID=2.813" 3-112"LNR.9.34.L-80 STL..0087 bpf,ID=2.992" H 9778' �� 44: 9778' —I3-112"X 3-3:16"XO,0=2.786" I BEHIND 9816' —J4-1/2'SHEAROUT SUB.D=? I CT LINER TOP OF CEMENT 9-5/8"CSG —1 9810' ;i 9817' H4-1;2"WLEG,0=3.958"I 4-1/2"TBG,12.6#,N-80 BUTT. 9817' ::t'e4 ;•• •4:• 9800' —I ELNID TT LOGGED 12/28/77 ♦•• 4••• .0152 bpf,ID=3.958" •••••�, 4•••••• •••••f; ,!.• 9-5/8"MILLOUT WINDOW(02-12B) 9848'-9855' 9-518"CSG,474,J&L-95 HARD, ID=8.681" H —9855 1-- ••1:4 t 3-3'16"WHIPSTOCK(TAGGED 04109/11) —{ 10132' I\ ' PERFORATION SUMMARY ' REF LOG: 2.74"MILLOUT W®NDOW(02-12C) 10131'-10135' ANGLE AT TOP PERF:`@' Note:Refer to Production DB for historical perf data1 SIZE SPF INTERVAL Opn/Sgz DATE 10205 —{JET CUT(04/23/1.) -. 10435' --IJET CUT(04/22/11) V 1 PBTD H 10540' I •• • '• •• 2-318"LNR.4.64,L-80 STL,.0039 bpf,ID=1.920" —1 12568' �. • DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12130/77 PKR 141 ORIGINAL COMPLETION 06/01/11 JLr PJC FINAL DRLG CORRECTIONS WELL: 02-12C 11/15/95 N3S CTD SIDETRACK(02-12A) PERMIT No:°42110250 06/22/07 N4ES CTD SIDETRACK(02-12B) AR No: 50-029-20277-03 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) SEC 36,T11 N.R14E,804'FNL&894'FWL 05/05/11 PJC DRLG DRAFT CORRECTIONS 05/29./11 PJC DRLG DRAFTCORRECTIONS BP Exploration(Alaska) • 5141 , I. 969' _ I 0 I( — Th) \\ ll _ 2 X240' II II ( j- L-moi J I \ i \ ..--------330:28287 IP 0 \ 32.--. I � ,e .— I J 1627 .I I i Enter Exit// — -- 16 . I I _ I I // //' � / I I I I \ // // II I /� 14■ \ —.� �, lIII b _ 33 • — — �_ — � li / N III 13• i I --r I I I ■31 I I 11 II ®I I I I5 - -' .36 1A i 11 I 35 t. I I I /III •37 1 / � t__ ) II I ' I I 39 39 ,1• I I -- II I I I I1 II 1 ••2 CA II I I I - 11 �I ! •29A II 1 10 I I 1 II 11 I •3 L=�I I 1 I 11 Ili 29 .4 1 9• I 1 — II II •34 1I I I I II r 26 • I� i a•- �, I� �I •5 25 • I I 1 I 11 i •5 II I ► I 1 1I sa 2 • I I —� I I I 24 • I II I I 1 I .1 / `ar I < 23 . -t 1J I �—_- j' ,j -, / � - / 1 I /, 00 et N22 • i /�— ��` // -� ISI 0'\../ ' U o i / u / X21 • I 1 r l I1 I` ___I I..., • II 1I I II � I II 1 19 • I I /-`\\ I i (i \\ / / / Enter Exit \ / _ / // ../ +-230' — - 2185' WELL PRODUCER ■or ❑ WELL INJECTOR ♦ DATE: 12/2/2010 SCALE : 1"= 350' MAP DATE:2010 PBU — DS 2 WELL SLOT W/CONDUCTOR 1a 5s'4495 7 d -, DS -2 . . July 9, 2010 Approximate Scale: 1 =400' 2010-19c-7-14 AIRO-METRIC . . '' . , o• . 'f''' .. . . . . . . • , . , \ ` . . • ' . , . . . . \,. •' ' 4400 ' . , --, . -,— , . . . ..., 4--- , 11i : , y "re*. 111111 . :,t...•,,,' • -a. .. - f . . . .. . .. .. , . - rt •:$., k -4—7.r•Li..:54,•:,"-t.—.‘,,,,l'''..,.:'-1 .-.-.''',:, Olt , t - --•.-- ., . . _44' i'. ,,`.:.,,''...';N'..r_1•._le,:.„.:.,..r. h,,,,,,s-. \6. :. .4, iti.:. '. ,.- .,5(6.. 1 7 ,,-; , - . . ,.-•• if4. .s ‘ -1 - Itp,,,%,.,, 2Y,;-!i.... ,',. ':i,--'1'.0 a'.''..'. '1.k.-/- '41 ,','''''': '-'------7-•.- .44- 14111r*+.44t,.....„...,_ ,— . ,,,,,/.7,:it-::•',,,8,7.,C,s.,4, ,,..!••4 ':.•..-.,;.!.---,-.4,-.--=',--7.4"-'1,--'"-.----,...........,...__,_ - ---- ''-''''''''''':'•'',.:1;,:,=** ' . — :.1.,,''-'--,:'i.•';',,i('''''s '!'',1:' t,4.7,,,k..-- .,..,:i kr, ..,.-.-•,., .!,. . . kty ..;.- .,,-,)44,..:,,z...:14',..,:,',.•*1",,, T.,4,: ••,::',,--'1..Vifir, ";-17,4 1.e.'•*:,4”'' •,.% • krs-...i,?-:-:,-",,,,,f,-,-)P,%<„): ' , ... . ... ., ../pc::p- ,•',',..,,e,. .‹i?;:-)t!(..i>,,,%,- ,/,.-, 4../..,i,,,,,.-,;, • . . ., .., .- : ' , , ,.--,•, I r.. ... , .., :'!'4',, •7.i!,.,.,,<'_!,....*'.',1,•..4 '''.-.r.';.4,,I.r./" ''• ,‘.('''."'Yr'`' /4.,...,4', /.,;V,:,1: ---,",•-i t.-..-rA__i ''-- [ . 1 ! • ................ , 1) • 1 ►i' , rAll 11' . r ,t.: 01.,,,, 1 1 lir I 64 !la I III ' mew .._ , , i1i ,4111 • Ii„, ii ' - llin III ' / !ii 'IPA =:' _.� 7, • - . • ) • . , ' .....,;•'.4".. ('{..tirry .1 n• . , 4 R Y '._� f Skim'-.' •\ 'qi -.'._. "'t ?-- '• a.Lti"......-.-^--,1-"-f`'v-- t �. �qp _.: i.. 2L. DS2-12: Wellhouse front(taken 07/02/2011) , ...,,,, : , •„........ .. _., ..... --,,, ,•-•', . I m,y: t,-. , , w-..--..._,.. ,. , . 3 t • 1 ..,_ k ' - " I ' '', ''--"-,..- ..''' •Iiit " ..10('---lirmenir • • - . 7 ,---- ..... • , --______ , ''',''.,',''. r.:.:7';',...-,:'•',,,,,," 4-.., -':,,:':,,', ; 7 . :If f,- l• , -,. $ . ' . .1 ,...,• '. •1,l , . . . , . i .. • . ; t • , . . • II 1- ' ), t i • . , - er .-- ••• r • . .— ,, -4' / , • f'4 I. )It ." ' • . --:. "- '', :.,, . . ) lirt ..- •, P V,._ , • * .4r1•1"...,-.M.P1,05* . :"„1'.., '-'"-- r .1 .„..• . ._. . .. . . . , • . . .. . . — -. _. . . _ . ,- • . ._ . , ' . ....... ..s..--.7.,,b ,- --.: - • - - _ „. - .,• :.-,.• .... . .. . , , „ . . . . - .. .. . - • . .. • . -7. •. , - • - -' •• - -. s . . . . . . . . . . . . ., _ . . . .,• . . . , ,• - • ... DS2-12: Wellhouse back (taken 07/02/2011) .. . ,,.. r1 1 - " 41 e , 1111010 . mss illp A„ ... , 5,L «.. 4. ,,` -.- / .2/ /// - -t > moi . y `• �' _` �'" r +t• , < -"f . w y 4 "1 - Ad // ' ' '-- ' * i 1/4##0 f.ilf 4,' // /. /lre DS2-12: Wellhead (taken 07/02/2011) .• . . ,_... / ., 4/11 3 / ••••‘ .. ... - . * L • ' . . , • a i I ' ......... . V ' 1. A / I . I i \ ...., : . . 1 ' • , A ' = ,, Apt. .. , . ., .... , . . ... .L.,. ' 7 v!-- • - --' 7'1". A . '' ° ' . -- ,'' '-0'''''''''.1 :I. '• f.: - -* -:',, y ?...' ..., : . , . , . , .. . „, .... .._ .., I . . , . . . .,. -4% r to'• . ...A. r.4114, •.,.! . . . . .. • ,P'• r ' . - • . - . ' --- ef- - 111- -v,-- \s, -1 •: , -,74fr ."r --f-Wall . . All • A 4 4 !rt.,': D S7-17: Tree (taken 07/02/2011) BAKER HUGHES iakerhughes.corn West tisiou 795 East 94th Avenue Anchorage,AK 99515 Tel: 907-267-6612 11. Fax: 907-267-6623 July 13, 2011 p ry Attention: Christine Mahnken r State of Alaska -AOGCC o. 0 333 West 7th Avenue Suite 100 Anchorage, AK 99501 Subject: Final Log Distribution—BP Exploration (Alaska), Inc. 02-12C Prudhoe Bay Unit North Slope Borough,AK API #: 50-029-20277-03 Rig: Nordic-2 SO#: 3756573 Please find enclosed the following final deliverables for the above well: 1-- Set of Color Prints(to foltow) 1.-- Survey Report tit L �� c/ 1 Data CD l 1 We sincerely appreciate the opportunitf to provide our products and services to you and look forward to working with you in the future. Should you have any questions, you can contact me at(907) 267-3420. Regards, Jim Woods Geoscience Advisor Enclosures JW/dh Letter of Transmittal /EMI BAKER Date: May 12, 2011 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): P2-04L1 2 n- 007 14-33A al)-oati 02-12C x c( - ox y 06-02APB 1 06-02A )1 I I - 0 A-C. Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: V. , State of Alaska AOGCC DATE: it Lt Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Wednesday, June 01, 2011 9:30 AM To: 'Leemhuis, Jacob' Subject: RE: DS 02-12C (PTD 211-025) Thanks for the explanation ... makes a lot more sense now. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Leemhuis, Jacob [mailto:Jacob.Leemhuis@bp.com] Sent: Wednesday,June 01, 2011 7:20 AM To: Schwartz, Guy L (DOA) Subject: RE: DS 02-12C (PTD 211-025) Guy, Sorry for getting back to you so late, I was down in Houston over the past week. Anyhow I will give you a description of what happened and if you need more detail please feel free to give me a call. We ran the liner and everything went as planned. During our cement job, we saw high pressures (-4,000 psi) during the entire cement job. We saw a pressure spike which indicated we had bumped the plug. We LD the cement BHA and RIH with our cleanout assembly. We tagged hard and milled at 10,540' MD. It was then determined the liner wiper plug had been caught in a pup joint(this after much research in looking in tallies and barrels displaced). We ran a SCMT which came back showing there was cement behind pipe but after getting Schlumberger to look at it, it was determined to be a false reading. We RIH and tried to pull out the liner but failed. We then went back in with a jet cut and made a cut at 10,435' MD and tried to pull out the above liner in hopes of setting another whipstock and drill a new lateral. This also failed so we went back in one last time and made another jet cut at 10,205' MD and tried pulling the liner. This was also unsuccesful. We then POOH and RDMO to next well, leaving this well suspended. If you need more information please give me a call. Jacob (907) 564-4989 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Wednesday, May 25, 2011 3:20 PM To: Leemhuis, Jacob Subject: DS 02-12C (PTD 211-025) Jacob, Can you paraphrase what happened to DS 02-12C ... I don't remember getting an email or phone call to explain why the well wasn't perfed and the new liner cut. 6/1/2011 Page 2 of 2 Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 6/1/2011 0 L 6 el E O• O J L) L d j "zr co f 0 --` 0 o c L Q e m Q O t h• r. A w M .k d Y U 3 La L U U d Lo Cl) QQe9Qm m E oa O , m , O 10mA NG Or — U) NV U O O Q N Q 2 U mt- rest- t- O in N N N O O h IO 10 0 d NO O O O NNu. N N N NNNN I p i0 h ,..41;co-' N N Nm1= V IA co h N N) �1 a M r F.J. 0 F.2 O Q a W to 0 m I- U O O 0 LL LL 2 I 111 LU J C9 0 0 0 3 U 3 O EF 2 LL J LL LL r 2 0000O Z y0 _ 1-a m a 0 a p aa , a D a W � > Z Y5 Y I-F W 0 � a' LLd' ppJ z 2222oeQ' 22 - F-W W LL Q UWWWaWU) U)III z tg2U2a2pCL000 Z .0 N O co t0 M r 0 0 co /h CD Oo00a- 000000 fA # 2 0 CO 0 0 0 0 0 0 0 0 Y O OO O O O O O pN -a1n coO) a p ea in 2' H ¢ m ¢ aoao .- CLNto0 a I- to UJUJ3ip> UU -� 2 2 m m m CO Q m Q m m m m U N Z W CC y C J o O d co Ur C .92 C 1-.. _ p ao 1-,-, N >C N W Y U y of J y O E lg a+ 44 UNNNNNQm I U N O, O a o m d N W N 9 _ el M Z C C C� NQ 3 UU2 = NocnQ W co -c; OO. t Q m E p C m l Q w m ,c L► Q W o u Y so O Z re W O C., A N u H a J d a`) p a N a a a m a rn 1 CEOI STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION • WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: C Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned `5p Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 Cgi Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 4/26/2011 211-025 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 4/9/2011 50-029-20277-03-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number. Surface: 4/17/2011 PBU 02-12C 804'FNL,894'FWL,SEC.36,T11 N, R14E, UM 8. KB(ft above MSL): 56' 15.Field/Pool(s): Top of Productive Horizon: 4125'FNL,3391'FWL, SEC.36,T11 N,R14E,UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 4627'FNL,29'FWL,SEC.31,T11 N, R15E, UM 10540' 9000' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 687642 y- 5950398 Zone- ASP4 12598' 9033' ADL 028308&028326 TPI: x- 690222 y- 5947140 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 692152 Y- 5946687 Zone- ASP4 None 18.Directional Survey: ® Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/MCNL 10131' 8806' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 109' Surface 109' 30" 255 sx Arcticset 13-3/8" 72# N-80 Surface 2702' Surface 2702' 17-1/2" 7200 sx Arcticset 9-5/8" 47# N-80 i RS-95 Surface 9848' Surface 8577' 12-1/4" 1000 sx Class'G' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 9726' 10131' 8469' 8806' 4-1/8" 111 sx Class'G' 2-3/8" 4.6# L-80 9668' 12568' 8418' 9034' 3" 61 sx Class'G' 24. Open to production or injection? 0 Yes Igl No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): No Plans to Perf,Most Likely to be Sidetracked in the future 5-1/2", 17#,N-80 9612' 9599' MD TVD MD TVD 4-1/2", 12.6#,N-80 9612'-9817' ___ 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. CQMPLEfO ? DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ' .""111 _ .o /_ 10435' Jet Cut 2-3/8"Liner(Top of Cmt in Liner at 10540') v-1,4,• .I 10205' Jet Cut 2-3/8"Liner(Not able to pull) 2500' Freeze Protectedw/66 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A-Shut-In, Liner full of cement Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: •WATER-BBL: OIL GRAVITY API(CoRK): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RECEIVED' MAY 19 2011 RE3r SAS MAY 2 0 2011 " )`y� a1 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE K�-B�d &CPIi CM-f ��fuSS1AD Sybmit Original Only •LS•4�(I•IcItTbs %, 29. GEOLOGIC MARKERS(List all formations and mark icountered): 30. RATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 23SB/Zone 2B 10186' 8850' None 22TS 10259' 8904' 21TS/Zone 2A 10357' 8956' Zone 1B 10492' 8993' TDF/Zone 1A 10940' 9030' MHO 11100' 9041' Top Tar 11150' 9044' Formation at Total Depth(Name): TDF/Zone 1A 10940' 9030' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. � 0S7/01,/ Signed: Terrie Hubble (,( " Title: Drilling Technologist Date: l( �( ��(rL. \ PBU 02-12C 211-025 Prepared By Name Number. Terrie Hubble,564-4628 Well Number Permit No./Approval No. Drilling Engineer: Jacob Leemhuis,564-4989 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America-ALASKA- BP Page 1 of 17 • Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud DateTme:11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/5/2011 17:00 - 20:45 3.75 MOB P j PRE RIG RELEASED FROM Y-20A AT 17:00 HRS. BACK RIG OFF WELL AND SET DOWN ON PAD. FINISH CLEANING UP AROUND CELLAR. DRILLER AND TP PERFORMED PRE MOVE ROUTE DRIVE. 20:45 - 21:15 0.50 MOB N WAIT PRE WAIT ON SECURTIY TO MOVE RIG. BEGIN ROLLING TIRES TO WARM DRIVE SYSTEM. 21:15 - 21:45 0.50 MOB P PRE PJSM W/ALL RIG CREW AND SECURITY FOR MOBILISING RIG. 21:45 - 00:00 2.25 MOB P PRE JACK UP RIG AND LEVEL OUT. MOBILISE RIG AND BEGIN MOVE TO DS 2. 4/6/2011 00:00 - 11:30 11.50 MOB P PRE CONTINUE RIG MOVE TO DS 2. 11:30 - 12:000.50 MOB P , ,' , PRE PJSM TO BACK OVER WELL. 12:00 - 14:00 2.00 MOB P PRE PREP WELL FOR BACKING OVER. SPOT RIG OVER WELL AND SET DOWN. , _ RIG ACCEPTED AT 14:00 FIRS. 14:00 - 15:30 1.50 RIGU F P • PRE R/U HANDI-BERM AROUND CELLAR. - SPOT SAT CAMP. 15:30 - 18:00 2.50 RIGU —P; PRE PJSM FOR N/U BOP'S REMOVE TREE CAP AND XO SPOOL. I BEGIN N/U BOP'S. 18:00 - 18:45 0.75 RIGU P PRE CREW C/O. PJSM FOR N/U BOP'S. 18:45 - 21:00 2.25 - RIGU P 'I ! PRE CONTINUE N/U BOP'S. R/U LUBRICATOR. 21:00 - 21:30 0.50 RIGU . P - PRE HOLD RIG EVACUATION DRILL AND AAR. ' ENTIRE CREW MUSTERED IN SATELLITE OFFICE. DISCUSSED CREW RESPONSE, ACCOUNTING FOR ALL PEOPLE ON I , 1 LOCATION(CH2 TRUCK PUSHER ON LOCATION AND RESPONDED),AND WHO HAS AUTHORITY TO ACTIVATE RIG ESD. 21:30 - 00:00 2.50 BOPSUR P PRE HOLD PJSM ON PERFORMING WEEKLY BOPE TEST. i FILL STACK AND BEGIN WEEKLY BOPE TEST. TEST TO 250-PSI LOW AND 3500-PSI HIGH I FOR ALL TESTS. HOLD AND CHART EACH TEST FOR j 5-MINUTES. TEST WITNESS WAIVED BY MATT HERRERA _ W/AOGCC. 4/7/2011 00:00 - 08:00 8.00 BOPSUR P PRE CONTINUE TESTING BOPE. TEST TO 250-PSI LOW AND 3500-PSI HIGH FOR ALL TESTS. w� HOLD AND CHART EACH TEST FOR 5-MINUTES. TEST WITNESS WAIVED BY MATT HERRERA W/AOGCC. BLOW ON 2%KCL INTO PITS. Printed 4/28/2011 4:30:49PM North America-ALASKA- BP Page 2 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth, Phase ' Description of Operations (hr) L (ft) I 08:00 - 11 30 'I 3.50 BOPSUR P i ! PRE FINISH BOP TEST RIG EVAC EXERCISE. ACTIVATE RIG EVAC i I i ALARM. CONDUCT AAR AFTERWARDS,GOOD RESPONSE BY CREWS. M/U CT PACKOFF TO INJECTOR. PULL COIL ACROSS PIPE SHED ROOF AND INTO INJECTOR. 11:30 - 12:00 0.50 BOPSURP PRE INSTALL BOOT ON END OF ELINE. -- — 12:00 - 13:30 -i 1.50 BOPSUB P PRE FILL REEL FORWARD WITH KCL. MAKE UP CT RISER, LINE UP TO REVERSE CIRCULATE. PRESSURE TEST CT PACKOFF AND INNER REEL VALVE TO 250/3500 PSI,GOOD. THIS COMPLETES THE BOP TEST. 13:30 - 14:05 ! 0.58 RIGU P PRE REVERSE CIRCULATE AT 2.50 BPM/4800 PSI TO PUMP SLACK BACKWARDS. OPEN CT RISER AND LIFT INJECTOR OFF WELL. 14:05 - 14:45 0.67 RIGU N SFAL PRE NORDIC FLOORHAND CHECKING PUMP RM #1 REPORTS KCL WATER THERE. INVESTIGATE AND FIND THE HAMMER UNION i DOWNSTREAM OF THE POPOFF VALVE IS LEAKING. ESTIMATED 10 GAL OF KCL WATER HAS LEAKED ONTO THE FLOOR OF THE PUMP ' ROOM,WITH APPROXIMATELY 3/4 GAL i I ij RUNNING OUTSIDE THE PUMP ROOM DOOR I• I ONTO THE SNOW. ' I SCRAPE UP THE KCL OUTSIDE THE DOOR AND DISPOSE OF IT. INFORM 5700 AND CTD SUPT OF MATERIAL RELEASE. 14:45 - 16:00 1.25 RIGU P PRE PJSM FOR CUTTING CT WITH HYDRAULIC CUTTER. CUT 250 FT OF CT OFF. / INSTALL DIMPLE DART CATCH AND PUMP `// FORWARD TO GET WIRE TO TOOL END. 16:00 - 16:30 0.50 RIGU P PRE VALAVE CREW ARRIVES. CONTINUE TESTING RIG ALARMS AND PJSM FOR LIFTING DSM LUBRICATOR TO RIG FLOOR. 16:30 - 19:15 2.75 BOPSUR P WEXIT R/U AND PT LUBRICATOR TO 250 PSI LOW/ 3500 PSI HIGH-GOOD. LATCH BPV AND RETRIEVE. PERFORM INDEPENDANT PT ON BOTH MASTER AND SWAB. 250 PSI LOW/3500 PSI HIGH. BLEED OFF LUBRICATOR AND R/D. OFFLOAD SAME. 19:15 - 19:30 0.25 RIGU P WEXIT PJSM FOR P/U INJECTOR AND RE-HEADING. 19:30 - 21:30 2.00 RIGU P WEXIT P/U INJECTOR. DRESS END OF COIL AND INSTALL KENDALL INTERNAL CTC. PULL TEST TO 27K#. HEAD UP BHI CABLE HEAD AND TEST. BLOW BACK COIL. 21:30 - 22:00 0.50 KILLW P WEXIT POP OFF INJECTOR AND INSTALL KNIGHT CAP IN PREP FOR BULLHEAD KILL. PT KNIGHT CAP TO 250 PSI LOW/3500 PSI HIGH.CHART TEST-PASS. 22:00 - 23:00 1.00 KILLW N RREP WEXIT 'PJSM FOR C/O LEAKING LINER ON PUMP#2. -CIO LINER. Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 3 of 17 4 . ( Aeration Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time: 11/25/1977 12:00:OOAM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date I From-To Hrs Task Code , NPT NPT Depth' Phase ; Description of Operations (hr) _ (ft) _ i 23:00 - 00:00 1.00 KILLW P WEXIT PJSM FOR BULLHEAD KILLING WELL. - LINE UP THRU KILL AND OPEN UP TO THE WELL.WELL IS ON A VAC. - PUMP 5 BBL MEOH SPEAR FOLLOWED BY 8.4 PPG 2%KCL. - PUMP @ 6 BPM. T/IA/OA-2290/231/7 PSI. - 100 BBLS AWAY T/IA/OA-2380/89/7 PSI. - 200 BBLS AWAY T/IA/OA-2512/18/9 PSI. 4/8/2011 00:00 - 00:30 0.50 KILLW P WEXIT CONTINUE W/BULLHEAD KILL. PUMPING @ 6 BPM. -300 BBLS AWAY T/IA/OA-2168/5/9 PSI. -350 BBLS AWAY T/IA/OA-2130/4/9 PSI. DOWN ON PUMPS.WELL IS ON A VAC. `, ' T/IA/OA--VAC/4/9. 00:30 - 01:00 0.50 KILLW P WEXIT PERFORM 30 MIN. FLOW CHECK-NO FLOW. 01:00 - 01:30 0.50 WHIP P 1 WEXIT INSTALL UQC CHECKS AND FLUID PACK COIL. PT CTC TO 3500 PSI. I I I PT AND CHART CHECKS TO 250 PSI LOW/ 1500 PSI HIGH-PASS. 01:30 - 02:00 I 0.50 WHIP � P 1 WEXIT FILL HOLE-TAKES 6 BBLS. BLOW DOWN KILL LINE. iI BRING BAKER TOOLS UP BEAVER SLIDE. 02:00 - 02:15 I 0.25_, WHIP P WEXIT M/U WHIPSTOCK TO SETTING TOOL ON CATWALK. 02:15 - 02:30 0.25 . WHIP i P ' WEXIT PJSM FOR M/U WHIPSTOCK SETTING BHA. 02:30 - 03:00 0.50 WHIP P I WEXIT FILL HOLE-TAKES-4 BBLS. -- i M/U WHIPSTOCK SETTING BHA ON BHI I I COILTRAK. BHA OAL=67.04 FT. 1P/U INJECTOR AND STAB ON. 03:00 - 05:00 2.00 WHIP P I WEXIT TEST TOOLS AND BEGIN RIH AT 100 FPH. PUMP @ 0.65 BPM THRU OPEN EDC. WT.CHECK @ 9000 FT=30K. LOSING—7 BPH RIH. _ 05:00 - 07:30 2.50 WHIP P WEXIT LOG GR TIE-IN FROM 9700 FT AT 125 FPH. I — '0.66/0.55 BPM IN/OUT AT 540 PSI CIRC. 07:30 - 08:30 1.00 WHIP N RREP WEXIT AFTER LOGGING, LEAK IS SEEN ON THE GREYLOC CONNECTION ON PUMP#1 DISCHARGE LINE, NEAR THE CIRCULAR STAIRS. I CONDUCT PJSM FOR CHANGING THE GREYLOC SEAL OUT. DISCUSS KEEPING THE HOLE FULL AND CT 1 I FREEZEUP. I PICK UP TO 9700 FT. 08:30 - 08:50 j 0.33 WHIP , N RREP WEXIT PJSM THEN ADD A SHORT SECTION OF 1502 LINE TO THE MUD MANIFOLD TO CIRC THE CT AND GET DOUBLE ISOLATION ON THE PUMP LINE. 08:50 - 11:00 I 2.17 WHIP i N RREP WEXIT EXTRA LINE IS IN PLACE. CIRC TO FILL WELL AND WARM UP THE CT PT THE LINE TO 2000 PSI, GOOD. I I PERFORM LOCKOUT/TAGOUT OF PUMP#1 I AND VERIFY. START REPAIR OF PUMP LINE#1. REPLACE STEEL GASKET IN GREY-LOC CONNECTION. TIGHTEN EVERYTHING UP AND PRESSURE I !TEST PUMP LINE#1 TO 250/4000 PSI,GOOD. Printed 4/28/2011 4:30:49PM North America-ALASKA- BP Page 4 of 17 • Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site:PB DS 02 Rig Name/No: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor.NORDIC CALISTA UWI: 500292027700 Active Datum:02-12©56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 12:30 1.50 WHIP P WEXIT RIH TO 10145 FT,PICK UP TO WHIPSTOCK SETTING DEPTH. PARK AT 10139.2 FT, PLACES TOP WHIPSTOCK AT 10130 FT,AT 90L TF. CLOSE EDC AND PRESSURE UP TO 2800 PSI TO SHEAR OUT SETTING TOOL. AFTER SETTING,DWOB=1.09K. SET DOWN TO 1.8K DWOB TO VERIFY SET,THEN PICK UP 20 FT. START OFFLOADING FLUID FROM PITS FOR SWAP TO MUD. 12:30 - 15:20 2.83 WHIP P • WEXIT START MUD DOWN CT. 15:20 - 17:20 2.00 WHIP P .`, WEXIT MUD SWAP IS COMPLETE. PERFORM 10 MIN FLOW CHECK OF WELL. NO FLOW. POOH. 17:20 - 18:00 0.67 WHIP P • WEXIT PJSM TO UD BHA L/D WHIPSTOCK SETTING BHA. 18:00 - 18:15 0.25 STWHIP P WEXIT PJSM FOR P/U WINDOW MILLING BHA. DISCUSS DROPPED OBJECTS,WELL CONTROL,AND PINCH POINTS. 18:15 - 18:45 0.50 I STWHIP P ,. r WEXIT I I 1, . •. OF 2.74"DSM AND STRING REAMER,2-1/8" MOTOR,2 JTS 2-1/16"CSH,AND COILTRAK i BHA. j MILL GAUGED 2.73"NO-GO/2.74"GO. 18:45 - 21:00 2.25 STWHIP P WEXIT RIH ON TRIP SHEET @ 100 FPM. PVT=307 BBLS. 1:1 RETURNS @ 0.5 BPM AND 1400 PSI CIRC. 21:00 - 21:15 0.25 STWHIP P I WEXIT LOG GR TIE-IN @ 150 FPH FROM 9874 FT. MAKE-43 FT CORRECTION. 21:15 - 21:30 0.25 I STWHIP P WEXIT CONTINUE RIH TO WHIPSTOCK. TAG WS AT 10132 FT.W/PUMPS OFF. P/U AND BRING PUMPS UP TO 1.6 BPM/3370 PSI CIRC. RIH AND TAG WS AT 10131.3 FT. 21:30 - 00:00 2.50 STWHIP P WEXIT BEGIN TIME MILLING WINDOW FROM 10131.3 SAZ:le‘' FT. 62A4Led FS IS 3370 PSI @ 1.6 BPM. DEPTH: CIRC: DWOB: DELTA P: 21:45- 10131.50 FT 3380 PSI 0.54K 602 PSI 22:15-10132.00 FT 3450 PSI 1.33K 688 PSI 12:45- 10132.30 FT 3430 PSI 1.59K 665 PSI ( 1 FT INTO WINDOW) 00:00- 10132.80 FT 3410 PSI 1.80K 650 PSI Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 5 of 17 • Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) L Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT 1 NPT Depth Phase 1 Description of Operations ft 4/9/2011 00:00 - 07:40 7.67 , STWHIP P WEXIT I CONTINUE MILLING WINDOW FROM 10132.80 FT. 1 1.6 BPM AT 3370 PSI FS. I DEPTH: CIRC: WOB: DP: 02:30-10133.50 FT 3480 PSI 1.88K I 730 I 03:15-10134.00 FT 3440 PSI 1.65K 700 03:38-10134.60 FT 3400 PSI 0.80K 611 APPEAR TO HAVE EXITED 3-3/16"LINER DUE TO 800#LOSS WOB AND DROP IN MW. THEORETICAL EXIT AT 10135.5 FT. CONTINUE TIME MILLING. 04:30-10135.00 FT 3360 PSI 0.30K I I 611 05:00-10135.50 FT 3290 PSI 0.20K 1582 07:40 - 08:20 0.67 STWHIP P WEXIT REACH END OF RATHOLE AT 10145 FT. PICK UP FOR 3 SLOW REAMING PASSES AT 50 FT/HR UP AND DOWN. STALL AT 10133 FT ON FIRST REAMING II PASS, PICKUP IS CLEAN. RIH AT 0.4 FT/MIN FOR NEXT REAMING PASS. 1.66 BPM @ 3350 PSI @ 10130 FT. 200 PSI MOTOR WORK AT 10132 FT, STOP 1 IHERE AND LET IT WORK. DWOB 0.03K. 08:20 - 08:50 j 0.50 STWHIP 1 P WEXIT CONTINUE CLEANING WINDOW AREA. RIH 0.2 FT/MIN. STOP AT 10133.20 FT AND LET MOTOR WORK,400 PSI DP. SEE PERIODIC MOTOR DP AT RIH SPEED OF 0.2 FT/MIN. 08:50 - 09:20 0.50 STWHIP P 1 WEXIT SECOND PASS DOWN ISA BIT CLEANER, ABOUT 150-200 PSI DP AT 20 FT/HR. LITTLE SEEN ON THE UP PASS. 'THIRD PASS DOWN IS CLEAN,ABOUT 50 PSI DP. 09:20 - 10:00 0.67 STWHIP P WEXIT DRY TAG THROUGH WINDOW IS CLEAN. TAG BOTTOM OF RATHOLE AT 10145 FT. I PICK UP ABOVE WINDOW.TOW 10131.2 FT. I I BOW 10135.2 FT. PUMP HI-VIS SWEEP AROUND,10 BBLS. 10.00 - 12:00 '1 2.00 STWHIP P r WEXIT SHUT OFF PUMP FOR 10 MIN FLOW CHECK I AFTER PILL IS OUT OF THE BIT. FLOW CHECK IS NEGATIVE. 1TRY TO OPEN EDC,STILL ABOUT 100-150 PSI DP ACROSS TOOL,CAN'T OPEN IT. I PUMP 1.5 BPM THROUGH THE MOTOR AND PICK UP TO 9700 FT. I CHECK SOME TREE BOLTS FOR TORQUE WHILE DOING FLOW CHECK,WILL CHECK , THE REST AT SURFACE. , STOP AT 9700 FT AND OPEN EDC. PUMP 2.0 rt BPM/3300 PSI WHILE POOH. 12:00 - 13:00 1.00 STWHIP P 1 WEXIT TAG STRIPPER. TRIP SHEET IS-1 BBLS. L/D COILTRAK, PH6 AND WINDOW MILL. I i I MILL IS 2.73"NO-GO. 13:00 - 14:00 : 1.00 DRILL P PROD1 M/U BHA#3-HYC TREX,2.3 DEG MOTOR, 2-3/8"COILTRAK W/NO RES. BHA OAL=58.24 FT. Printed 4/28/2011 4:30:49PM North America-ALASKA- BP Page 6 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) i Project:Prudhoe Bay I Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase • Description of Operations (hr) (ft) 114:00 - 16:00 2.00 DRILL P PROD1 RIH BHA#3. TIE-IN DEPTH,CORRECT-38 FT. 16:00 - 17:45 1.75 DRILL P PROD1 PASS THROUGH WINDOW CLEAN AT 90L, DRILL FROM 10145 FT. DRILL TO 10250 FT, ROP IS AROUND 80 FT/HR. 17:45 - 19:45 2.00 DRILL P I. PROD1 AT 10250 FT GETTING CLEANER SURVEYS, { DLS APPEARS TO BE AROUND 45 DEG/100 WITH THIS 2.3 DEG MOTOR. DISCUSS WITH i ODE, DECIDE TO POOH FOR LESSER BEND MOTOR. I POOH. PULL THROUGH WINDOW AND OPEN -- _ ! _ EDC, PUMP 2.1 BPM/3500 PSI OH. 19.45 - 20:00 0.25 DRILL P ! PROD1 PJSM FOR UD BHA AND CHANGING AKO OF , MOTOR. 20:00 - 20:30 0.50 DRILL P ' PROD1 PERFORM FLOW CHECK AT SURFACE, STATIC.PVT 250 BBLS. CLOSE EDC. TRIP SHEET-3 BBLS. UD BHA AND DIAL DOWN AKO FROM 2.3 TO 1.8 DEG. 20:30 - 21:10 0.67 DRILL 1 P 1 PROD1 M/U BHA#4-3"HYC TREX BI-CENTER,1.8 DEG AKO,AND 2-3/8"COILTRAK TOOLS. i BHA OAL=58.24 FT. 21:10 - 23:00 1 1.83 'DRILL P ' PROD1 RIH WITH BHA#4.100 FPM,PUMPING.48 { I BPM,1170 PSL RIH TO9830FT. 23:00 - 00:00 1.00 i DRILL - PPROD1 LOG CASED HOLE GR TIE IN.-41 FT I CORRECTION. 1 , CONTINUE RIH TO 9915 FT. LOG DOWN AT 10000 FT. 4/10/2011 00:00 - 01:00 I 1.00 DRILL P PROD1 CONTINUE LOGGING GR DOWN THRU RA TAG. 01:00 - 03:00 2.00 DRILL P PROD1 DRILL AHEAD IN BUILD SECTION FROM 10250 I IFT. 1.84 BPM IN/OUT @ 3560 PSI FS. 1.5-2K#DHWOB W/150-250 PSI MW. ROP 75 FPH. GETTING 30-31 DLS W/THIS AKO. BHP/ECD/PVT:4188 PSI/9.13 PPG/288 BBLS. DRILL TO 10400 FT. 03:00 - 03:30 0.50 i DRILL P PROD1 WIPER TO WINDOW FROM 10400 FT. 03:30 - 04:00 0.50 1 DRILL P PROD1 DRILL AHEAD FROM 10400 FT.TO 10405 FT. HOT LOCKED UP.UNABLE TO ORIENT. STUCK AT 90 LEFT.PVT 287 BBLS. 04:00 - 06:30 2.50 DRILL N DFAL 10,405.00 PROD1 POH FOR HOT FAILURE. PERFORM 10 MINUTE FLOWCHECK ABOVE WINDOW.STATIC. I _ OPEN EDC.CONTINUE POH. 06:30 - 07:00 0.50 1 DRILL N r DFAL 10,405.00 PROD1 TAG STRIPPER AND UD BHA. BIT IS 3-3,NOT RE-RUNABLE. 07:00 - 07:30 0.50 WHSUR j N SFAL 1 PROD1 WHILE POOH WEEPHOLE ON SSV IS DRIPPING WATER. CALL OUT VALVE CREW -----_— -- 4- r •TO HELP DIAGNOSE. Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 7 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date: 4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 09:30 2.00 WHSUR N SFAL PROD1 VALVE SHOP CREW ARRIVES AND DIAGNOSES THE PROBLEM AS WELLBORE FLUID BYPASSING THE BONNET STEM PACKING. APPLY A HEATER TRUNK TO THE VALVE BODY AND SCHEDULE GREASE CREW OUT LATER TO GREASE IT AFTER IT HAS WARMED UP. I PJSM WITH CREW TO DISCUSS PLAN FORWARD. CONTINUE MONITORING FLUID LEVEL IN WELL, LOSING LESS THAN 1 BBUHR. 09:30 - 12:30 3.00 WHSUR N SFAL r---:`PROD1 GREASE CREW COMES OUT TO GREASE VALVE AFTER ITS BEEN WARMING UP. FILL I IT WITH GREASE,STILL DRIPPING. VALVE SHOP SUPERVISOR COMES OUT TO INSPECT, DECISION IS MADE TO CHANGE OUT SSV. 12:30 - 16:00 3.50 j WHSUR N SFAL PROD1 CALL VALVE SHOP CREW OUT TO SET BPV. VALVE CREW ARRIVES. TRY TO GET PT ON Ii, MASTER VALVE, NO GOOD. I 1 DISCUSS PLAN FORWARD WITH WTL, ,' DECIDE TO HOLD OFF ON SETTING BPV. i MAY NEED TO SET DOWNHOLE PLUGS TO I SATISFY BREAKING CONTAINMENT CRITERIA. CONTINUE MONITORING HOLE FILL IN BETWEEN TESTS. 16:00 - 21:30 5.50 WHSUR N SFAL PROD1 WAIT ON APPROVED OPS NOTE FROM ODE, FIELD SUPT.,AND WTL FOR PLAN FORWARD -1 FOR SETTING RBP. CONTINUE MONITORING HOLE FILL. 21:30 - 21:45 0.25 WHSUR N SFAL PROD1 RECEIVE APPROVED OPS NOTE FOR i SETTING DOWNHOLE PLUG. BOT ON LOCATION W/TOOLS. BRING TOOLS UP BEAVER SLIDE. 21:45 - 22:15 0.50 WHSUR N SFAL PROD1 PJSM TO DISCUSS APPROVED PLAN FORWARD. DISCUSS WELL CONTROL, DROPPED OBJECTS,WSRBP HANDLING PROCEDURES, AND FLUID MANAGEMENT POLICY. 22:15 - 22:30 0.25 WHSUR 1 N SFAL PROD1 M/U WSRBP TO SETTING TOOL ON RIG FLOOR. 22:30 - 22:45 0.25 � WHSURT—N SFAL i PROD1 PJSM FOR M/U BHA#5. 22:45 - 23:15 0.50 I WHSUR i N ! SFAL I ' PROD1 M/U BHA#5 CONSISTING OF 5-1/2"WSRBP, 1 #20"J"HYD.SETTING TOOL W/1-11/16"BALL • ON SEAT,XO'S TO 2-3/8 REG,2-3/8" COILTRAK TOOLS,AND SLB CTC. 23:15 - 00:00 0.75 1 WHSUR N SFAL PROD1 RIH W/BHA#5 W/EDC OPEN AT MIN.RATE. 0.5BPM.o 1100 PSI CIRC. 4/11/2011 00:00 - 00:15 0.25 ; WHSUR 1 N SFAL j PROD1 RIH W/WSRBP TO 2115 FT AND PARK COIL. SHUT DOWN PUMPS AND CLOSE EDC. PRESSURE UP AND SEE SHEAR AT 4500 PSI. DHWOB SHOWS 5K#AND RBP HOLDING STEADY. _- L 1 P/U TO 2100 FT. 00:15 - 00:30 0.25 WHSUR N SFAL PROD1 LINE UP TO PT RPB. PT RBP TO 250 PSI LOW/3500 PSI HIGH- PASS.CHART TEST. BLEED OFF PSI. 00:30 - 00:45 0.25 WHSUR N SFAL i PROD1 PJSM W/LRS FOR PUMPING DIESEL FP. Printed 4/28/2011 4:30:49PM `forth America -ALASKA- BP Page 8 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site:PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs 1 Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) 00:45 - 01:15 0.50 WHSUR N SFAL PROD1 R/U LRS AND PT LINES TO 4K PSI. 01:15 - 02:30 1.25 WHSUR N SFAL PROD1 PUMP 5 BBL WATER SPACER AND COME ON-LINE W/LRS. PUMP TOTAL OF 55 BBLS OF DIESEL FOR FP. CONTINUE DISPLACING DIESEL FP W/ 35 BBLS FRESH WATER. LEAVE 5 BBLS OF DIESEL IN THE END OF COIL. 02:30 - 03:45 1.25 WHSUR N SFAL PROD1 PJSM FOR L/D BHA#5. TAG UP AND FLOW CHECK WELL. BREAK OFF INJECTOR AND STAND BACK ON LEGS. BLOW DOWN BHI TOOLS. L/D BHA#5. { INSPECT SETTING TOOL. TOOL HAS I FUNCTIONED NORMALLY. BLOW DOWN LINES AND PREP FLOOR FOR _ __ R/U LUBRICATOR. 03:45 - 04:00 0.25 WHSUR N SFAL 1--' PROD1 PJSM W/DSM FOR R/U LUBRICATOR TO PULL BPV. 104:00 - 04:45 0.75 WHSUR N SFAL . PROD1 BRING DSM LUBRICATOR UP TO RIG FLOOR USING STINGER AND R/U. 04:45 - 08:30 3.75 WHSUR N SFAL PROD1 FILL TREE W/DIESEL. PRESSURE TEST BPV LUBRICATOR TO 250/ 3500 PSI, GOOD. PUT 500 PSI AGAINST WRP PLUG THEN SET BPV. BLEED TREE TO 300 PSI AND MONITOR, HOLDING PRESSURE. BLEED OFF TO ZERO PRESSURE AND CLOSE _1--- ALL TREE VALVES,R/D DSM LUBRICATOR. 08:30 - 13:00 4.50 WHSUR N SFAL JJ' PROD1 OFFLOAD DSM LUBRICATOR. PREP TO MOVE RIG OFF WEI L I I N/D BOP STACK AND INSTALL TREE CAP. PT TO 250/3500 PSI,GOOD 13:00 - 13:20 0.33 WHSUR i N SFAL PROD1 PJSM FOR MOVING RIG OFF WELL. 13:20 - 18:30 5.17 1 WHSUR N SFAL PROD1 JACK UP RIG AND MOVE BACK TO EDGE OF PAD. KEEP A FIRELANE OPEN IN FRONT OF THE RIG AND GIVE FMC CREW ENOUGH ROOM TO CHANGE OUT TREE. 'WHILE WAITING ON FMC TO C/O TREE j INSPECT BOP RAMS AND CAVITIES. I C/O BAG IN KOOMEY BOTTLE#1. 19:15 - 19:35 0.33 WHSUR N SFAL PROD1 FMC DONE C/O WELLHEAD AND OFF LOCATION. PJSM FOR BACKING RIG OVER WELL. T 19:35 22:15 2.67 WHSUR N SFAL - - —. PROD1 JACK UP RIG AND MOVE BACK OVER WELL. SET RIG DOWN AND LEVEL OUT. R/U HANOI-BERM AROUND CELLAR AND SPOT SECONDARY EQUIPMENT. • WHILE R/U AND PREPARING TO N/U BOP'S • THE TREE FLANGE B/T THE MASTER AND SSV WAS FOUND TO NOT BE SQUARE ALL I THE WAY AROUND. 1 I CALL OUT DSM VALVE CREW TO RE-TORQUE TREE FLANGE PRIOR TO BEGINNING N/U BOP'S. 22:15 - 22:45 I 0.50 WHSUR N SFAL 1 I PROD1 WAIT FOR VALVE CREW TO ARRIVE TO • � RE-TORQUE TREE FLANGE. Printed 4/28/2011 4:30:49PM Forth America -ALASKA- BP Page 9 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date: 4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ; NPT Depth Phase Description of Operations (hr) I (ft) 22:45 - 00:00 1.25 WHSUR 1 N ' SFAL I PROD1 VALVE CREW ON LOCATION. PJSM IN CELLAR W/VALVE CREW AND RE-TORQUE TREE. 4/12/2011 100:00 03:30 3.50 BOPSUB N SFAL - PROD1 PJSM FOR NIU BOP'S. N/D TREE CAP AND N/U BOP'S. GET RKB HEIGHTS AND GREASE MUD CROSS. 03:30 - 04:00 0.50 BOPSUB N SFAL PROD1 VALVE CREW ON LOCATION TO PUMP OPEN SSV. 04:00 - 05:00 1.00 BOPSUB N SFAL PROD1 HOLD PJSM FOR BOPE TEST. FILL STACK AND PREP TO BEGIN BOPE TEST. - 05:00 - 07:00 2.00 BOPSUR N SFAL PROD1 BEGIN TESTING BOPE AS PER APPROVED WELL PLAN,AOGCC REGS,ADWOP,AND PTD. TEST TO 250-PSI LOW AND 3500-PSI HIGH FOR ALL TESTS, n O( HOLD AND CHART EACH TEST FOR q 5-MINUTES. / TEST WITNESS WAIVED BY LOU GRIMALDI �115 W/AOGCC. 07:00 - 13:30 6.50 BOPSUR ' N SFAL PROD1 CONTINUE BOP TESTING. 13:30 - 17:30 4.00,_._, BOPSUR ! N SFAL PROD1 BLIND SHEARS FAILED PT. OPEN RAM 1 DOORS TO INSPECT AND FOUND 1 RAM I INSTALLED INCORRECTLY AND BLADE WAS I II I DAMAGED. GET SPARE RAM BODIES FROM NORDIC 1. INSTALL RAMS AND RE-TEST.PT I I ; FAILED. ` OPEN DOORS AND INSPECT AND FIND UPPER SEAL DAMAGED. I REPLACE SEAL AND DRESS EDGES OF RAM . BLOCKS. RE-INSTALL RAMS AND RE-TEST.PASSED. 17:30 - 19:00 1.50 BOPSUR N 1 SFAL 1 PROD1 R/D TEST EQUIPMENT AND CLEAN UP f CELLAR AREA. 19:00 - 19:30 0.50 WHSUR N SFAL PROD1 CREW C/O. PJSM W/VALVE CREW FOR P/U — — — i — f LUBRICATOR. 19:30 - 20:15 0.75 WHSUB N SFAL PROD1 1 P/U DSM LUBRICATOR AND R/U. 20:15 - 20:30 0.25 WHSUB N SFAL PROD1 PJSM W/VALVE CREW FOR PULLING BPV. 20:30 21:30 1.00 WHSUR N SFAL PROD1 PT LUBRICATOR TO 250 PSI LOW/3500 PSI 1 _ 1 I HIGH. 21:30 - 22:30 1.00 WHSUR N WAIT 1 PROD1 STOP AND WAIT FOR TT HARDLINE TO BE PTD BEFORE PULLING BPV. HARDLINE CREW ARRIVES AND PTS _ HARDLINE TO 4250 PSL 22:30 - 00:00 1.50 WHSUR N SFAL PROD1 EQUALIZE PRESSURE AND PULL BPV. i BLEED OF PRESSURE AND R/D LUBRICATOR. BPV RETRIEVED. OFFLOAD SAME. 4/13/2011 00:00 - 00:15 0.25 FISH 1 N SFAL PROD1 PJSM FOR P/U INJECTOR AND PT INNER REEL VALVE AND CT PACK-OFF. 00:15 01:00 r 0.75 FISH N SFAL PROD1 P/U INJ.AND STAB ON. DISPLACE FP OUT OF COIL W/MUD. 01:00 - 01:45 0.75 FISH N SFAL PROD1 PT INNER REEL VALVE AND CT PACK-OFF TO [ COMPLETE FULL BOPE TEST. d 250 PSI LOW/3500 PSI HIGH. Printed 4/28/2011 4:30:49PM Forth America -ALASKA- BP Page 10 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPTNPT Depth Phase Description of Operations (hr) I (ft) 01:45 - 02:30 0.75 FISH I N SFAL PROD1 PJSM FOR PUMPING SLACK. P/U INJ.AND REMOVE BHI UQC. PUT INJ. OVER BUNGHOLE. PUMP OUT 235 FT OF SLACK. CALCULATED SLACK WAS 255 FT. 20 FT.OF SLACK UNACCOUNTED FOR. 02:30 - 03:30 f 1.00 FISH N SFAL PROD1 PUMP 3/4"DRIFT BALL THRU COIL. BALL RECOVERED. 03:30 - 03:45 0.25 FISH N SFAL PROD1 I CLEAN AND PREP RIG FLOOR FOR HEADING i UP BOT CTC. RE-BUILD QUARTER TURN VALVE#30 ON CHOKE MANIFOLD. 03:45-BOT ON LOCATION. 03.45 - 04:15 0.50 FISH N SEAL PROD1 PJSM AND BRING BOT TOOLS UP BEAVER SLIDE. __ .; 04:15 - 05:00 0.75 FISH N SFAL i L.PROD1 DRESS END OF COIL HEAD UP BOT 2"CTC.PULL TEST AND PT. 05:00 - 05:45 0.75FISH N., SFAL ` , PROD1 PJSM FOR M/U BHA#6. M/U BHA#6 CONSISTING OF BAKER MODEL "M"RET. HEAD,5K RUPTURE DISC,3/4" DISCONNECT, BOWEN OIL JAR,DFCV,AND 2 JTS 2-3/8"PH6. BHA OAL=79.63 FT. • 05:45 - 06:00 ' 0. 2,.5 FISH N SFAL t- - PROD1 PJSM TO PU INJECTOR AND STAB ON WELL 06:00 - 07:00 I 1.00 Y.. FISH N SFAL PROD1 RIH TO 2050 AND DISPLACE OUT DIESEL ;1 , I FREEZE PROTECT TAKING RETURNS TO THE TIGER TANK 07:00 - 07:05 0.08 FISH N SFALPROD1 SPR: S BPM/1000 - 1.5 BPM/2150',PU WT ' - - ' 12.5K ___ 07:05 07:10 0.08 FISH N SFAL 1 - j PROD1 RIH @ 34FPM AND TAG @2114.7 W/5K DN WT, PU TO 15K&WAIT FOR WELL TO L EQUALIZE 07:10 - 07:25 0.25 FISH N SFAL PROD1 POH TO 2100'WAIT 15 MINUTES FOR ELEMENTS TO RELAX 07:25 - 08:15 0.83 FISH i N SFAL 1 PROD1 RIH TO 2140 W RBP-NO DRAG PUMP BTMS UP @ 1 BPM 08:15 - 09:20 ' 1.08 FISH N RREP PROD1 REPAIR NORDIC TOTCO BEFORE POH 0920 - 10:25 1.08 FISH N � SFAL I PROD1 FLOW CHECK WELL FOR 10 MINUTES- STATIC-POH HOLDING 400#ON CHOKE WHILE PUMPING THROUGH COIL 10:25 - 10:45 0.33 FISH N SFAL PROD1 TAG AT SURFACE,FLOW CHECK WELL,PJSM TO LAY DOWN BHA 10:45 - 11:00 0.25 FISH N SFAL PROD1 LAY OUT BOT BHA AND RBP 11:00 - 11:25 0.42 DRILL I N 1 SFAL PROD1 PJSM TO PUMP SLACK 11:25 - 12:30 1.08 DRILL N PROD1 PUMP SLACK BACK IN COIL AND RU CT 1 l CUTTER 12:30 - 13:00 0.50 j DRILL N SFAL PROD1 CUT 255'COIL-R/U TO PUMP SLACK FORWARD. WIRE FOUND AT END OF COIL.TEST WIRE- GOOD. DRILL N SFAL 13:00 - 14:30 1.50 PROD1 INSTALL KENDALL CTC.PULL TEST TO 36K. HEAD UP BHI AND PT UQC AND CTC TO 3500 i I I PSI. 14:30 - 15:15 0.75 DRILL N SFAL PROD1 'PT CHECKS TO 250 PSI LOW/1500 PSI HIGH. 15:15 - 15:45 0.50 DRILL N SFAL PROD1 STAND BACK INJ.AND SET ON LEGS. INSPECT INJ.SLING. 15:45 - 16:00 0.25 DRILL N DFAL PROD1 PJSM FOR M/U BHA. Printed 4/28/2011 4:30:49PM ^'orth America-ALASKA- BP Page 11 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 4/5/2011 End Date.4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 116:00 - 17:00 1.00 DRILL N DFAL ! ' PROD1 M/U BHA#7 CONSISTING OF 1.8 DEG AKO _ ! AND RE-BUILT HYC 3"BI-CENTER BIT. 17:00 18:15 1.25 DRILL N DFAL j PROD1 RIH W!BHA#7. 1 I OBTAIN SPR'S: 0.5 BPM @ 1280 PSI. 1.5 BPM @ 2800 PSI. 18:15 - 18:30 0.25 DRILL N DFAL PROD1 LOG CASED HOLE GR TIE-IN. MAKE-41 FT CORRECTION. 18:30 - 20:45 2.25 DRILL N � DFAL j PROD1 CONTINUE RIH. SEE SLIGHT SET DOWN AT BOTTOM OF WINDOW. • WORK THRU SHALES GETTING BACK TO • BOTTOM. SET DOWN AT 10220 FT,10270 FT,AND 10290 FT. TRY TO WORK THRU 10320 FT. MULT.TIMES AT VARIOUS PUMP RATES AND RUNNING SPEEDS. SEE SLIGHT OVERPULLS ON P/U'S. CIRC. PSI @ 1.2 BPM IS 3700 PSI. POSSIBLY 1PLUGGED A NOZZLE. NO ANN. PSI INCREASE. BACKREAM UP TO 10180 FT W/SLIGHT MW AT 10270 FT. TALK W/ODE AND RIH TO TRY AND RUN THRU TROUBLE SPOT AT 10320 FT. 20:45 - 21:15 0.50 DRILL N , DFAL I j PROD1 RIH AND SET DOWN AT 10320 FT. 1.2 BPM AT 3300 PSI. 2K#DHWOB W/LITTLE TO NO MW. BHP/ECD/PVT:4191 PSI/9.10 PPG/425 BBLS. 21:15 - 21:45 0.50 DRILL N FLUD ' PROD1 I OUT MM RATE AND DENSITY DROPPED OFF. BLOW DOWN MM AND SEE NO CHANGE. PUH TO ABOVE WINDOW. I I MUD SEEN COMING OUT IS VERY FOAMY IAND FLUFFED UP W/AIR BREAKING OUT. ; I SHUT DOWN PUMPS AND FLOW CHECK AT ' 1.1 0100 FT-NO FLOW. 21:45 - 22:00 0.25 DRILL N FLUD PROD1 I DECIDE TO OPEN EDC AND CBU TO GET CLEAN MUD ALL THE WAY AROUND. PVT=425 BBLS. / 22:00 - 22:45 0.75 DRILL N FLUD PROD1 5 BBL PIT GAIN NOTED-PVT=430 BBLS. S/D PUMPS AND FLOW CHECK-NO FLOW. WELL IS STATIC. DISCUSS W/MUD ENGINEER AND ADD DF-9065 TO THE MUD TO CONDITION IT BEFORE CONTINUING. DISCUSS PLAN FORWARD W/FIELD SUPT. AND ODE FOR CONDITIONING MUD AND CBU. PIT LEVEL DROPS BACK TO 425 BBLS AFTER ADDING DE-FOAMER TO SYSTEM. 22:45 - 00:00 1.25 DRILL N FLUD PROD1 CONTINUE CBU FROM 10100 FT THRU OPEN EDC. 1.5 BPM @ 2560 PSI. MM OUT RATE AND DENSITY STARTING TO REGISTER CORRECTLY. - N FLUD PROD1 CONTINUE CIRC.BOTTOMS UP FROM 10100 4/14!2011 !00:00 00:45 0.75 DRILL I 1 FT. 1.5 BPM@2460 PSI. MOTOR RUBBER SEEN COMING OVER SHAKER. Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 12 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT � NPT Depth Phase Description of Operations (hr) (ft) 00:45 - 01:00 0.25 DRILL N FLUD PROD1 FINISH CBU AND MUD HAS CLEANED UP. S/D PUMPS AND FLOW CHECK WELL-NO I FLOW. __MORE RUBBER NOTED ON SHAKERS. 01:00 - 01:15 0.25 DRILL N FLUD PROOF RIH FROM 10100 FT. CLOSE EDC AND RUN PAST WINDOW.SEE SLIGHT SET DOWN AT 10135 FT. OBTAIN NEW SPR'S:0.5 BPM @ 1530 PSI/1.0 BPM @ 2600 PSI. CONTINUE RIH AND SEE SPIKES IN CIRC. PRESSURES. (RUBBER PLUGGING OFF BIT) 1.4 BPM @ 3900 PSI. 01:15 - 02:45 1.50 DRILL N DFAL PROD1 POOH TO INSPECT AND C/O MOTOR. PVT=424 BBLS. PUH ABOVE WINDOW AND OPEN EDC. 02:45 03:15 I 0.50 � CONTINUE POOH. 1.57 DRILL N DFAL BPM @ 2450 PSL_ PROD1 AAR FOR KWT.DRILL AND PJSM FOR C/O IMOTOR. 03:15 - 04:25 1.17 DRILL I N + DFAL PROD1 TAG UP AND FLOW CHECK-NO FLOW. UNSTAB AND BREAK-OFF MOTOR AND BIT. MOTOR IS LOCKED-UP AND RUBBER FOUND IN EVERY BIT NOZZLE. .04:25 06:10 1.75 DRILL N DFAL I H PROD1 RIH W/BHA#8 CONSISTING OF NEW MOTOR - - - AND SAME HYC BI-CENTER BIT. 06:10 - 06:25 0.25 DRILL N DFAL ` ' PROD1 TIE IN FROM 9830 W/-42.5 CORRECTION 06:25 - 07:15 0.83 i DRILL . N , DFAL I PROD1 CONTINUE IN HOLE TO 10300-HAVE IPROBLEMS GETTING THROUGH 07:15 - 07:30 0.25 ! DRILL P PROD1 BACKREAM FROM 10300 TO 10200 W/AS JDRILLED TOOL FACE �07:30 - 09:15 1.75 DRILL P PROD1 WORK HOLE TO 10347-STILL HAVING I TROUBLE GOING DOWN 09:15 - 10:05 0.83 DRILL P PROD1 BACK REAM TO 10200 W/TF 180 OUT TO ' CLEAN HOLE 10:05 - 10:30 0.42 DRILL P I - PROD1 APPEAR TO STILL BE IN ORIGINAL HOLE- TAG BOTTOM-PU AND BACK REAM AGAIN I 180 OUT 10:30 - 10:45 0.25 DRILL I P PROD1 'TIH-BACK REAMED AREA CLEAN BACK ON _ _ BOTTOM AT 10403' 10:45 - 12:15 1.50 I DRILL P I PROD1 DRILL AHEAD TO LAND BUILD SECTION AT 10536'-1.85 BPM,3600FS,26 WHP,190 IAP, 1 1 146 OAP,9.25 ECD,415 PVT 12:15 - 13:15 1.00 DRILL P 1 PROD1 HAVING TROUBLE WITH SURVEY ' VALIDATION TEST 13:15 - 13:45 0.50 I DRILL P 1 1I PROD1 POH FOR LATERAL BHA 13:45 - 15:40 1.92 DRILL P PROD1 STOP ABOVE WINDOW AT 10050'FOR FLOW I CHECK-GOOD-OPEN EDC AND CONTINUE TO POH 15:40 - 17:00 1.33 DRILL P PROD1 TAG UP AND FLOW CHECK-GOOD. 1 L/D BHA#8. BIT GRADED 2-2 W/TWO 1 CHIPPED CUTTERS ON THE NOSE AND 1 ON THE WING. 17:00 - 19:00 2.00 DRILL P PROD1 M/U AND RIH W/BHA#9 CONSISTING OF 1.0 DEG AKO AND RE-BUILT HYC RAZOR BI-CENTER BIT. 19:00 - 19:15 0.25 DRILL P ; PROD1 !LOG GR TIE-IN AND MAKE-43 FT CORRECTION. Printed 4/28/2011 4:30:49PM -'orth America -ALASKA- BP Page 13 of 17 Operation Summary Report Common Well Name: 02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) 19:15 - 20:20 1.08 DRILL P F-PROD1 CONTINUE RIH.CLOSE EDC AND RIH THRU WINDOW CLEAN. OBTAIN SPR'S AND CONTINUE RIH TO BOTTOM CLEAN. TAG BOTTOM @ 10537 FT. I P/U AND VALIDATE SURVEYS PRIOR TO DRILLING AHEAD IN PREP FOR CLOSE APPROACHES. 20:20 - 21:30 1.17 DRILL P PROD1 DRILL AHEAD FROM 10537 FT. 1.76 BPM @ 3450 PSI FS. I 1-1.5K#DHWOB.ROP 150 FPH. I HOLDING 70L TFO BUILDING TO 87 DEG INC. BHP/ECD/PVT:4331 PSI/9.33 PPG/362 PVT. PUMP 10 BBL HI-VIS PILL. i _ _'DRILL TO 10650 FT. 21:30 - 22:20 0.83 DRILL P ' PROD1 I WIPER TO WINDOW FROM 10650 FT. SLIGHT MW PULLING UP THRU SHALES. CLEAN ON PASS DOWN. 22:20 - 00:00 1.67 I DRILL ( P PROD1 DRILL AHEAD FROM 10650 FT. CATCH 25 FT. SAMPLES PAST 10700 FT AS PER GEO. I II 1.76 BPM IN/OUT. ! 100-150 PSI MW. ROP-125 FPH W/1-1.5K# DHWOB. SHORT WIPERS AS NEEDED. INCREASED CUTTINGS SEEN COMING OVER SHAKER W/ PILL. BHP/ECD/PVT:4351 PSI/9.35 PPG/381 BBLS. i i PUMP 10 BBL HI-VIS PILL. �, DRILL TO 10770 FT HOLDING 87 DEG INC. 4/15/2011 00:00 - 00:45 I 0.75 DRILL P PROD1 CONT BRu I inn AHFAO IN I ATFRAI FROM . 1n77n FT SHORT WIPER FROM 10800 FT. HOLD 87 DEG INC. DOWN TO 10825 FT. (8966' • SSTVD) 00:45 - 01:45 1.00 DRILL P ! PROD1 PUH TO ABOVE WINDOW WHILE CBU FROM 1 10825 FT AS PER GEO. (LOOKING FOR MHO) OPEN EDC ABOVE WINDOW AND CONTINUE CBU.2.3 BPM @ 3875 PSI. SMALL INCREASE OF CUTTINGS COMING OVER SHAKER W/PILL. 01:45 02:00 0.25 DRILL P PROD1 LOG CASED HOLE GR TIE-IN AND MAKE+3 FT CORRECTION. 02:00 03:00 1.00 , DRILL P PROD1 CLOSE EDC AND RIH THRU WINDOW. ' SLIGHT MW SEEN AT 10270 FT. RIH TO BOTTOM AND WAIT TO DRILL AHEAD UNTIL GEO HAS HAD TIME TO ANALYZE SAMPLE FROM 10825'. GEO CONFIRMS NO MHO IN 10825 FT SAMPLE. 03:00 - 03:45 0.75 DRILL P PROD1 DRILL AHEAD FROM 10825 FT. CONTINUE HOLDING 87 DEG INC. PLAN IS TO DRILL DOWN TO 8970 FT SSTVD LOOKING FOR MHO. 11.80 BPM IN/OUT @ 3850-4000 PSI CIRC. 1-2K#DHWOB. ROP-100 FPH. BHP/ECD/PVT:4363 PSI/9.37 PPG/384 BBLS. DRILL TO 10900 FT. 03:45 - 05:50 2.08 I DRILL P PROD1 GEO WIPER FROM 10900 FT. CBU TO CATCH SAMPLE AT 10900 FT I BEFORE DRILLING AHEAD. LOOKING FOR MHO. Printed 4/28/2011 4:30:49PM Forth America-ALASKA- BP Page 14 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task I Code ' NPT ' NPT Depth Phase , Description of Operations (hr) -,- 05:50 - 06:55 1.08 DRILL P PROD1 BACK ON BOTTOM AND DRILL TO 10962-1.8 BPM 3550# 06:55 - 07:20 0.42 DRILL P PROD1 WIPER FOR GEO-CIRCULATE BOTTOMS UP AT 10962' 07:20 - 09:15 1.92 DRILL P PROD1 'HELD KICK WHILE DRILLING DRILL. RIH BACK TO BOTTOM FOLLOWING GEO WIPER. 09:15 - 11:15 2.00 DRILL P PROD1 DRILL AHEAD FROM 10962'MD. 1.85 BPM,3650 PSI, ECD 9.4 PPG, BHP 4393 • PSI. PVT 371 BBLS. DRILL TO 11050'MD. 11:15 - 12:00 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW,CLEAN. PUMP 20 BBLS HIGH VIS SWEEP,PVT 379 - BBLS. . TIE IN LOG FROM 10150'MD,+3.5' _ CORRECTION. 12:00 - 13:45 1.75 DRILL P ! PROD1 CONTINUE RIH FOLLOWING WIPER. CLEAN BACK TO BOTTOM. 13:45 - 14:30 0.75 DRILL P PROD1 DRILL AHEAD FROM 11052 FT. 1.84 BPM @ 3650 PSI FS. 9.4 PPG ECD. PVT=454 BBLS. I' START TO BUILD INCLINATION PAST 11060 FT.TO GET OUT OF SHALEY INTERVAL DRILL TO 11093 FT. 14:30 - 15:30 1.00 � DRILL P PROD1 MAKE GEO WIPER. HOLE CLEAN. 15:30 16:45 i 1.25 r DRILL P - PROD1 DRILL AHEAD FROM 11052 FT. 'CONTINUE REVERTING BACK UP TO GET ✓ i H ,. BACK IN ZONE. START OFF-LOADING NON-ACTIVE PITS IN PREP FOR MUD SWAP. DRILL TO 11200 FT. 16:45 - 18:15 1.50 DRILL P PROD1 'WIPER TO WINDOW FROM 11200 FT. SLIGHT MW SEEN AT 10250 FT. PVT=202 BBLS. 18:15 - 20:45 2.50 DRILL P PROD1 DRILL AHEAD FROM 11200 FT. START MUD SWAP ONCE BACK ON BOTTOM. 1.8 BPM @ 3600 PSI FS. BHP/ECD/PVT:4422 PSI/9.46 PPG/202 BBLS. CONT. BUILDING ANGLE HOLDING 95-96 DEG INC.TARGETING 8968-8970 FT SSTVD. GEO FOUND TAR IN SAMPLE AT 8995 FT SSTVD. 20:15-DRILL TO 11350 FT. j STAY ON BOTTOM CIRC. NEW MUD ALL THE WAY AROUND UNTIL STARTING WIPER TO WINDOW. I GET NEW SPR W/NEW MUD: I SPR#1 MP.9 BPM @ 1880 PSI,1.8 BPM @ I I 3230 PSI � —` — SPR#2 MP.9 BPM @ 1880 PSI,1.8 BPM @ 3230 PSI 20:45 - 22:00 1 1.25 DRILL P ! PROD1 WIPER TO WINDOW FROM 11350'. SEE SLIGHT OVERPULL AT 10220 FT ON WAY UP AND A LITTLE STICKY AT 11350 FT ON WAY DOWN. 22:00 - 22:30 0.50 DRILL P PROD1 WAIT TO DRILL AHEAD WHILE GEO ANALYZES SAMPLE FROM 11350 FT. FINISH MUD SWAP. Printed 4/28/2011 4:30:49PM North America-ALASKA- BP Page 15 of 17 • Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 23:45 1.25 DRILL P PROD1 DRILL AHEAD FROM 11350 FT CATCHING 25 FT.SAMPLES. PLAN IS TO TARGET 8980 FT.AS PER GEO AND CBU TO CATCH SAMPLE. 1.78 BPM IN/OUT @ 3600-3650 PSI CIRC. 1.5-2.5K#DHWOB. ROP—90 FPH. BHP/ECD/PVT:4374 PSI/9.38 PPG/333 BBLS. DRILL TO 11460 FT.(8980 FT SSTVD)&START LONG WIPER TO WINDOW WHILE CBU. 23:45 - 00:00 0.25 DRILL P PROD1 WIPER TRIP.TO WINDOW FROM 11460 FT. 4/16/2011 100:00 - 02:15 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 11460 FT. HOLE CLEAN.PVT 323 BBLS. TIE IN LOG AT 9780 FT.+6 FT.CORRECTION 02:15 - 03:45 1.50 DRILL P PROD1 DRILL LATERAL SECTION FROM 11460 FT. CATCHING 25 FT.SAMPLES WHICH ARE STILL SHOWING MHO. 1.81 BPM IN/OUT @ 3600-3650 PSI CIRC. 1.5 2.5K#DHWOB.ROP—115 FPH.I/A=68, 01./5A-=2.551(# /A=522 BHP/ECD/PVT:4394 PSI/9.38 PPG/329 BBLS. 03:45 - 05:40 1.92 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 11600 FT. SLIGHT MW AT 11350 FT BUT NO OVERPULL. SEE MW AND SET DOWN AT 11275 FT RUNNING BACK DOWN. SAMPLES HAVE SINCE CLEANED UP OF MHO. AFTER TALKING W/GEO PLAN ONCE BACK ON BOTTOM IS TO HOLD 89-90 DEG AND TRACK ABOVE MHO WHICH IS PROJECTED TO BE DIPPING SLIGHTLY DOWN SECTION. 05:40 - 07:00 1.33 DRILL P PROD1 DRILL AHEAD FROM 11600 FT. 1.78 BPM IN/OUT @ 3170 PSI FS. 1-1.5K#DHWOB.ROP—125 FPH. I/A=139,O/A=560 PSI. BHP/ECD/PVT:4398 PSI/9.44 PPG/344 BBLS. PUMP 10 BBL HI-VIS PILL. 07:00 - 09:00 2.00 DRILL P PROD1 REMOVE PIT 4 FROM ACTIVE SYSTEM. PVT= 301 BBLS. I WIPER TO WINDOW FROM 11750 FT. GET SPR'S: 0.9 BPM @1820 PSI. 1.8 BPM @ 3250 PSI. 09:00 - 11:15 2.25 DRILL P PROD1 DRILL AHEAD FROM 11750 FT. 1.86 BPM @ 3550 PSI FS. BHP/ECD/PVT:4425 PSI/9.48 PPG/305 BBLS. WHP/IA/OA:37 PSI/205 PSI/616 PSI. _ ! _ DRILL TO 11900 FT. 11:15 - 12:15 1.00 DRILL P . PROD1 'WIPER TO WINDOW FROM 11900 FT AND TO I LOG TIE-IN. PVT=311 BBLS. 12:15 - 12:30 j 0.25 DRILL ' P PROD1 LOG GR-TIE IN FROM 10150 FT. MAKE+7 FT CORRECTION. 112:30 - 13:15 0.75 DRILL " P PROD1 RIH TO BOTTOM FOLLOWING TIE-IN. 13:15 - 15:45 2.50 DRILL P j PROD1 DRILL AHEAD FROM 11900 FT. 1.83 BPM AT 3450 PSI FS. BHP/ECD/PVT:4463 PSI/9.56 PPG/303 BBLS. WHP/IA/OA:59 PSI/291 PSI/695 PSI. DRILL TO 12050 FT. 15:45 - 18:15 2.50 DRILL j P PROD1 WIPER TO WINDOW FROM 12050 FT. PVT=292 BBLS. Printed 4/28/2011 4:30:49PM `forth America -ALASKA- BP Page 16 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date:4/18/2011 X3-00YL6-C(1,735,211.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) (ft) 18:15 20:00 1.75 DRILL P PROD1 I DRILL AHEAD FROM 12050 FT. 1.82 BPM IN/OUT @ 3700 PSI CIRC. 1-1.5K#DHWOB. ROP--125 FPH. BHP/ECD/PVT:4520 PSI/9.69 PPG/283 BBLS. WHP/IA/OA:37 PSI/383 PSI/764 PSI. BLEED OA FROM 764 PSI TO 570 PSI- MOSTLY GAS W/A LITTLE FLUID. I 20:00 - 22:30 2.50 DRILL P PROD1 -WIPER TO WINDOW FROM 12200 FT.CLEAN. i PVT=267 BBLS SPR#1 MP.9 BPM 2050 PSI,1.8 BPM 3600 i PSI. SPR#2 MP.9 BPM 2050 PSI,1.8 BPM 3600 PSI 22:30 - 00:00 , 1.50 DRILL P ! PROD1 DRILL AHEAD FROM 12200 FT. - 1.8 BPM IN/OUT @ 3700 PSI CIRC. 1-1.5K#DHWOB. ROP-125 FPH. BHP/ECD/PVT:4607 PSI/9.80 PPG/261 BBLS. WHP/IA/OA:37 PSI/206 PSI/496 PSI. DRILL AHEAD TO 12273 FT. 4/17/2011 00:00 - 02:30 2.50 DRILL P PROD1 DRILL LATERAL SECTION FROM 12273 FT. 1.82 BPM IN/OUT @ 3800 PSI CIRC. 1-1.5K#DHWOB. ROP-80 FPH. BHP/ECD/PVT:5176 PSI/9.84 PPG/256 BBLS. WHP/IA/OA:37 PSI/243 PSI/571 PSI. I 12321 FT PUMP 10 BBLS HIGH VIS SWEEP ' DRILLING TO 12351 FT. 02:30 - 04:20 1.83 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 12351 FT. -I PVT=262 BBLS. PUH ABOVE WINDOW AND OPEN EDC TO JET ---1 TUBING. 04:20 - 04:30 0.17 DRILLjP ,.__, PROD1 LOG CASED HOLE GR TIE-IN AND MAKE+9 FT.CORRECTION. 04:30 - 05:45 1.25 DRILL P-- I , PROD1 CONTINUE RIH TO ABOVE WINDOW AND CLOSE EDC. I RUN PAST WINDOW CLEAN AND CONTINUE " ! % TO BOTTOM. SLIGHT SET DOWN AT 11227 FT. 05:45 - 08:45 3.00 DRILL P PROD1 DRILL AHEAD FROM 12350 FT. 1.81 BPM @ 3800 PSI FS. BHP/ECD/PVT:4612 PSI/9.89 PPG/249 BBLS. 1 ( WH/IA/OA:37 PSI/245 PSI/594 PSI. 08:45 - 09:00 0.25 DRILL IP , PROD1 200'WIPER FROM 12420 FT - - - - - t 09:00 - 10:30 1.50 DRILL P I I PROD1 BOBD -ROP DROPPING AND WEIGHT TRANSFER TO BIT ABOUT GONE. '10:30 - 11:15 0.75 DRILL P PROD1 WIPE HOLE FROM 12438 WHILE NEW MUD COMING TO LOCATION 11:15 - 12:00 0.75 DRILL P PROD1 NEW POWER-VIS MUD SYSTEM W/14 PPB ' j KLA-GARD,2%LOTORQ,AND 2%LUBE 776 ON LOCATION-START MUD SWAP 12:00 - 13:15 1.25 I DRILL ! P PROD1 BOBD @ 14438'-1.83 BPM 3320FS, 9.78 ECD, 33 WHP, 311 IA,591 OA 13:15 - 13:50 0.58 DRILL P PROD1 WIPE HOLE SLOWLY FROM 12500 FT WHILE FINISHING MUD SWAP 13:50 - 16:35 2.75 DRILL P PROD1 MUD SWAP COMPLETE-277 PVT-WIPER TRIP TO WINDOW-SLIGHT BOBBLES @ 10240 AND 11240-HOLE IN GREAT SHAPE - SPR W/NEW MUD: 0.9 BPM/1900#,1.8 BPM/ 3280# �P 16:35 - 19:00 2.42 DRILL P PROD1 DRILL AHEAD TO 12595 Ft AT TD AS PFR GEO AND DD. PVT 264 BBLS. Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 17 of 17 Operation Summary Report Common Well Name:02-12 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/5/2011 End Date: 4/18/2011 X3-00YL6-C(1,735,211.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 23:00 4.00 I DRILL P PROD1 WIPER TRIP TO WINDOW.CLEAN TIE IN LOG AT AT 10140 FT. +7 FT CORRECTION. I RIH TO TAG CORRECTED TD. CLEAN-UP SHALES BIT 11200 FT-11250 FT. TAG CORRECTED TO AT 12598 FT. 23:00 - 00:00 1.00 DRILL P PROD1 LAY IN LINER PILL AND POOH. 4/18/2011 00:00 - 00:45 0.75 DRILL P PROD1 CONTINUE POOH W/BHA#9. PUH ABOVE WINDOW AND OPEN EDC. 00:45 - 01:00 0.25 DRILL P PROD1 PERFORM 10 MIN.FLOW CHECK ABOVE WINDOW BEFORE CONTINUING POH. I FLOW CHECK GOOD. 01:00 - 02:45 1.75 DRILL P I PROD1 POOH PUMPING THRU OPEN EDC. 2.2 BPM @ 3430 PSI. PVT=288 BBLS. PAINT EOP FLAGS FOR LINER AT WINDOW AND AT TD. 02:45 - 04:00 1.25 DRILL P PROD1 PJSM FOR UD BHA#9. TAG-UP AND FLOW CHECK-NO FLOW. POP-OFF INJ.AND STAND BACK. BLOW DOWN BHI TOOLS. L/D BHA#9. BIT GRADED 3-2 W/BROKEN CUTTERS AND RING OUT. ALL SUBSEQUENT REPORTS UNDER THE CON EVENT. Printed 4/28/2011 4:30:49PM North America -ALASKA- BP Page 1 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project:Prudhoe Bay I Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor.NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/18/2011 04:00 - 04:30 0.50 CASING P RUNPRD PJSM FOR PUMPING SLACK. PUMP OUT 210 FT.OF SLACK OUT EXPECTING 225 FT. CUT OFF SLACK AND BOOT E-LINE. 04:30 - 05:45 1.25 CASING P RUNPRD PREP TO PUMP DRIFT. INSTALL BALL CATCHER SUB. PUMP 3/4"DRIFT THRU COIL AND RECOVER BALL. 05:45 - 07:30 1.75 CASING P RUNPRD CUT COIL AND REHEAD CTC-PULL TST TO 40K#AND PSI TST TO 3500# 07:30 - 08:30 1.00 CASING P RUNPRD STAND BACK INJECTOR AND PREP FLOOR TO RUN LINER 08:30 - 09:00 0.50 CASING P RUNPRD P,ISM FOR PFJ AND-RUN LINER 09:00 - 10:30 1.50 CASING P RUNPRD RUN 23/8"STL 4.6#SOLID LINER W/ CEMENTRALIZERS 10:30 - 11:10 0.67 CASING P , RUNPRD CONDUCT AN UN-ANNOUNCED D1(KICK WHILE TRIPPING)DRILL AND CONDUCT AN AAR WITH RIG TEAM 11:10 - 14:00 2.83 CASING I P RUNPRD CONTINUE TO RUN LINER 14:00 - 15:00 1.00 CASING -P RUNPRD SD LINER RUNNING OPERATION TO ALLOW BP AUDIT TEAM TO INTERVIEW RIG — _ PERSONNEL 15:00 - 15:45 0.75 P RUNPRD FINISH RUNNING TOTAL OF 89 JTS OF 23/8' ' CASING LINER. 15:45 - 16:15 0.50 CASING P ,I RUNPRD PU BTT SELBRT LINER RUNNING TOOL AND 4 JTS OF 2 1/16"CSH. OAL=3029.96'. 16:15 - 16:40 0.42 CASING P r' T- RUNPRD P/U AND STAB INJ. 16:40 - 17:45 1.08 CASING P RUNPRD RIH W/2 3/8"ON CT -FIRST EOP FLAG @ 7000'+3029.96 BHA=10029.96'CORRECT DEPTH -46'AND CONTINUE IN HOLE. 17:45 - 19:00 1.25 CASING P RUNPRD CONTINUE RIH W/LINER @ 60 FPM. SET DOWN AT 12440 FT. P/U TO 12200 FT AND TURN AROUND. RIH PAST TROUBLE SPOT. SECOND EOP FLAG @ 9468'+3029.96 BHA= 12497.96 FT. CTDS= 12496 FT. 19:00 - 19:30 0.50 CASING P RUNPRD RIH TO 12568 FT.AND SET DOWN. P/U'S CLEAN. CONTINUE WORKING LINER TO BOTTOM. TAG HARD AT 12568 FT. MULT.TIMES. CORRECTED TD WAS 12598 FT. P/U'S ARE GETTING HEAVY. -10-12K#OVER. Printed 4/28/2011 4:37:48PM ''orth America -ALASKA- BP Page 2 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date: 4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe BaySite: PB DS 02 I Rig Name/No.: NORDIC 2 j Spud Date/Time: 11/25/1977 12:00:00AM 'Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) I (ft) 119:30 - 20:15 0.75 CASING P RUNPRD VERIFY TALLY IS CORRECT AND ALL PIPE RAN IN THE HOLE AND LEFT OUT i ACCOUNTED FOR. UDAC DEPTH=9572'+3029.96'BHA=12602' I UNCORRECTED. CTDS DEPTH= 12568'CORRECTED TO EOP FLAG. EOP FLAG IS—25-30 FT. FROM BEING AT THE 1 INJ. CALL TOWN ODE TO DISCUSS DISCREPANCY AND DECISION IS MADE TO DROP BALL. VERIFY JEWELRY PROXIMITY AND CONTINGENT LTP PLACEMENT IF LANDED OFF BOTTOM. 20:15 - 20:30 0.25 CASING P RUNPRD 'P/U TO BALL DROP DEPTH. UP WT. =39K#. LAUNCH BALL. 20:30 - 21:45 1.25 CASING P RUNPRD BALL NOT HEARD ROLLING AFTER 6.4 BBLS. SURGE BALL AGAIN AND STILL NOTHING. CONT.CIRC. BALL TO SEAT. SET 10K DOWN ON LINER. SLOW DOWN TO 0.5 BPM AT 70%CT • VOLUME. 1900 PSI CIRC. CT VOL.=39.4 BBLS. • AFTER PUMPING 1-1/2 TIMES CT VOL. BALL NOT ON SEAT. 21:45 - 22:30 1 0.75 { CASING` P ' • RUNPRD S/D PUMPS AND P/U TO BALL DROP DEPTH • • TO ENSURE BALL IS NOT IN REEL IRON. PRESSURE UP AND SURGE BALL AGAIN. • BALL HEARD ROLLING IN REEL HOUSE AND OVER GOOSENECK. CONT.CIRC.BALL TO SEAT.SET 10K DOWN ON LINER. 'SLOW DOWN TO 0.75 BPM AT 22 BBLS IN. ' 2150 PSI CIRC. , BALL ON SEAT AT 27.8 BBLS. PRESSURE UP TO 3200 PSI AND SHEAR BALL J SEAT. I I P/U TO BREAK-OVER AND CONFIRM LINER IS FREE. NEW UP WT=31K#. SET 10K BACK DOWN. i 22:30 - 00:00 1.50 1 CASING ' P . RUNPRD BEGIN SWAPPING HOLE OVER TO 2%KCL. 4/19/2011 00:00 - 01:30 1.50 CASING P ! RUNPRD CONTINUE SWAPPING HOLE OVER TO 2% • KCL. 00:45-CEMENTERS ON LOCATION_ 01:15-PJSM W/CEMENTERS FOR SPOTTING I EQUIPMENT. 1.50/1.40 BPM IN/OUT @ 2130 PSI W/2%KCL ALL THE WAY AROUND. 01:30 02:45 • 1.25 CEMT P OFF-LOAD MUD AND LOAD PITS W/BIO. RUNPRD SPOT AND R/U CEMENTERS. 02:45 - 03:15 0.50 CEMT P RUNPRD i PJSM W/CEMENTERS FOR PUMPING JOB. DISCUSS WELL CONTROL,PERSONAL I SAFETY, DROPPED OBJECTS, COMMUNICATION,AND JOB RESPONSIBILITIES. 03:15 - 04:00 0.75 CEMT P RUNPRD SEND CEMENTERS WATER. START BATCHING CEMENT. 04:00***CEMENT @ WT.m Printed 4/28/2011 4:37:48PM Forth America -ALASKA- BP Page 3 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date: 4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12©56.00ft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT 1 NPT Depth I Phase j Description of Operations I (hr) (ft) 04:00 - 07:20 I 3.33 CEMT P , RUNPRD 1 LINE UP TO CMT LINE AND PUMP 3 BBLS TO , 11 WARM LINES. SHUT DOWN AND PT CEMENT LINES TO 4500 PSI. I 04:30-ON LINE W/12.5 BBLS OF CEMENT. I ZERO MM AT 15 PPG. 04:45-LINE UP AND SWAP TO 2 PPB BIOZAN TO DISPLACE CEMENT. 05:22- STOP 1 DISPLACEEMENT W D 2PUMPSN BLS CEMENT ABOVE C' ` SEL 13 T. ( P/U 13 FT.ABOVE NEUTRAL TO 12545 FT AND SIDE EXHAUST 2 BBLS OF CEMENT AND 3 BBLS OF BIOZAN. 05:30-OPEN BAKER CHOKE AND SET 10K 1 : I DOWN.SAME DEPTH AS BEFORE.CLOSE BAKER CHOKE. 05:32-PRESSURE UP TO 3100 PSI TO SHEAR LWP. PRESSURES ARE HIGH. 0.2 BPM @ 4300-4600 PSI WHILE DISPLACING LWP TO 'LANDING COLLAR. SLACK DOWN-8K#COIL WT.TO KEEP FROM HYD.OUT. 07:20 - 08:40 1.33 CEMT P RUNPRD 'UNSTING AND START POH W/LINER RUNNING TOOL 08:40 - 09:30 1 0.83 CEMT P RUNPRD STOP AT 2400'IT FOR BIOZAN RETURNS • T 1 09:30 - 10:10 0.67 I CEMT P ! RUNPRD GOOD BIO RETURNS TO SURFACE-NO . INDICATION OF CEMENT-FINISH TOH 110:10 - 11:30 1.33 CEMT P , RUNPRD TAG AT SURFACE-UN-STING AND STAND i i BACK INJECTOR-LAY DOWN BHA-NO INDICATIONS OF ANY PROBLEMS WITH SNORKEL OR E-LINE -+ 11:30 - 12:30 I 1.00 7 CONDHL P 7 I OTHCMP MU NEW BTT EXTERNAL SLIP CONNECTOR. 1 I I PULL TEST CONNECTOR TO 40K-LBS.-OK PRESSURE TEST CONNECTOR TO 3500-PSI- OK. 12:30 - 14:00 1.50 ' CONDHL P OTHCMP MU 3.79"CLEAN OUT BHA. BHA CONSISTS OF:3.79"GO/3.78"NOGO IPARABOLIC MILL,3-1/8"MOTOR,1/2"CIRC SUB,5/8"HYD DISCONNECT, DBPV,XO,3-JTS OF 2-3/8"PH6 TBG,AND XO. FLUSH DEAD LEGS OF REEL MANIFOLD. 14:00 - 15:00 1.00 CONDHL P OTHCMP STAB INJECTOR ON WELL. RIH WITH 3.79"CLEAN OUT BHA TO 7000'. 15:00 - 17:40 2.67 CONDHL P OTHCMP WAIT AT 7000'FOR CEMENT TO DEVELOP 500-PSI COMPRESSIVE STRENGTH. 17:40 - 18:30 0.83 CONDHL P OTHCMP CONTINUE TO RIH WITH 3.79"CLEAN OUT • BHA. I AT 9600', OBTAIN MILLING PARAMETERS. PU WT=28K-LBS. CIRCULATE AT 2.23-BPM 1 ' WITH 2900-PSI. TAG LINER TOP AT 9706'-9663'CORRECTED. 18:30 - 21:00 2.50 1 CONDHL P OTHCMP POH WITH 3.79"CLEAN OUT BHA AT 80-FPM. GET MILDLY CEMENT CONTAMINATED RETURNS-PH RISES AND DENSITY UP TO 8.61-PPG-SLOW TO 2-FPM AND TAKE RETURNS TO CUTTINGS BOX. WHEN RETURNS CLEAN UP,CONTINUE TO POH AT 80-FPM. Printed 4/28/2011 4:37:48PM 'orth America-ALASKA- BP Page 4 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA 'UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 22:00 1.00 CONDHL P 7 OTHCMP !HOLD PJSM ON LD CLEAN OUT BHA. TAG UP AT SURFACE AND FLOW CHECK-NO 'FLOW. UNSTAB INJECTOR AND STAND BACK. LD 3.79"CLEAN OUT BHA. NO SIGNIFICANT DAMAGE OR WEAR SEEN ON MILL. 22:00 - 23:00 1.00 BOPSUR P OTHCMP CLOSE MASTER VALVE. PU INJECTOR. I MU 5'STINGER AND SWIZZLE STICK TO COIL. MU INJECTOR. RIH AND JET STACK CLEAN. UNSTAB INJECTOR AND LD SWIZZLE BHA. 23:00 - 00:00 1.00 BOPSUR P OTHCMP RU AND BEGIN FUNCTION TESTING BOPE. FUNCTION BLIND SHEAR RAMS FROM OPS CAB. ALL BOPE COMPONENTS FUNCTION WITHOUT ISSUE. 4/20/2011 00:00 - 00:30 0.50 BOPSUR P OTHCMP FINISH BOPE FUNCTION TEST. NO ISSUES NOTED DURING FUNCTION OF ALL BOPE. 00:30 - 02:30 2.00 CONDHL P OTHCMP RU FLOOR FOR MU 1.75"CLEAN OUT BHA. CHANGE OUT DIES ON LITTLE JERK TONGS. CONFIRM AND LAY OUT BHA COMPONENTS. If02 30 - 07:00 4.50 i CONDHL P OTHCMP MU 1.75"CLEAN OUT BHA. BHA CONSISTS OF: 1.76"GO/1.75"NOGO I MILL,1-11/16"MOTOR,1/2"CIRC SUB,5/8" HYD DISCONNECT,XO,96-JTS 1"CSH,XO, 3/4"HI LOAD DISCONNECT, DUAL DBV,XO, 1 2-JTS OF 2-1/16"CSH,XO, QUICK CONNECT, BTT CTC. • PUMP THROUGH 1"CSH EVERY 15 STANDS . TO ENSURE CLEAR. 07:00 - 08:00 1.00 PCONDHL P OTHCMP STAB ON INJECTOR. RIH WITH 1.75"CLEAN OUT BHA TO 9600' 08:00 - 08:15 0.25 CONDHL ' P OTHCMP AT 9600',OBTAIN SLOW PUMP RATES AND _ PU WT OF 26K-LBS. 08:15 - 08:40 I 0.42 CONDHL ! P ' 1 OTHCMP CONTINUE TO RIH THROUGH TOP OF LINER AT 9717' TAG I IGHTLY AT 9866'. I PU AND FREE SPIN AT 1.1-BPM WITH 3400-PSI. RIH AND SEE SLIGHT MOTOR WORK. CONTINUE RIH TO 10500'. PU WT=29K-LBS. 08:40 - 11:00 2.33 , CONDHL P ? OTHCMP RIH FRnM mann'TO TAG AT 1(1540' j NOTIFY CTD ENGINEERING TEAM. W MILL.2'IN 1-HR ON WHAT APPEARS TO BE ✓t�.=,�' '�f\ DISCUSS SITUATION WITH CTD ENGINEERING TEAM. 11:00 - 15:00 4.00 EVAL N DPRB 12,595.00 OTHCMP POH WITH 1.75"CLEAN OUT BHA. SEE SMALL PIECES OF ALUMINUM AND RUBBER ACROSS SHAKERS TAG UP IN INJECTOR AND FLOW CHECK 1 I WELL-STATIC. UNSTAB INJECTOR AND SET BACK. 15:00 - 17:30 2.50 EVAL N DPRB 12,595.00 OTHCMP STAND BACK 1"CS HYDRIL TUBING IN I DERRICK. LD MOTOR AND MILL TO PIPE SHED. 1 MILL DAMAGED WITH MISSING DIAMONDS AND WEAR AROUND CIRCUMFERENCE. I PICTURES ATTACHED TO THIS REPORT. Printed 4/28/2011 4:37:48PM -'orth America-ALASKA- BP Page 5 of 12 . Operation Summary Report Common Well Name:02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay i Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 19:30 1 2.00 ! EVAL N WAIT ': 12,595.00 OTHCMP WAIT ON ORDERS FROM CTD ENGINEERING _ TEAM. ,19:30 - 20:00 0.50 EVAL ' N WAIT 1 12,595.00 OTHCMP RECIEVE APPROVED PLAN FORWARD FROM 1 CTD OPS ENGINEER. 20:00 - 22:00 2.00 EVAL N DPRB 12,595.00 OTHCMP HPLAN ES NGIRESR.E r HOOLDLD PJSM ON TTESTING RESERVOIR CONNECTIVITY. REVIEW PROCEDURE AND PROPER VALVE ALIGNMENT, DISCUSS CHANGES TO WELL PROGRAM AND PLAN FORWARD. TEST CONNECTIVITY TO 250-PSI FOR 5-MINUTES-GOOD. PRESSURE UP TO TEST CONNECTIVITY TO I 2400-PSI. SLOWLY BRING PRESSURE UP AT .5-BPM. SEE BREAKOVER AND FLAT LINE TO ESTABLISH INJECTION AT.5-BPM AT 2050-PSI. SHUT DOWN AND OBSERVE BLEED OFF OF 750-PSI OVER 5-MINUTES. CHART ALL ABOVE PRESSURE TESTING. DISCUSS RESULTS OF TEST WITH CTD ENGINEER. 22:00 - 23:00 1.00 EVAL X DFAL 12,595.00 OTHCMP BRING LOGGING TOOLS TO RIG FLOOR. BTT DELIVER PORTED SUB TO RUN ABOVE LOGGING TOOLS. 23:00 - 00:00 1.00 EVAL X DFAL 12,595.00 OTHCMP MU SLB MEMORY LOGGING TOOLS TO RUN GR/CCUSCMT LOGS. 4/21/2011 00:00 - 01:30 1.50 EVAL X DFAL 12,595.00 OTHCMP FINISH MU MEMORY GR/CCUSCMT LOGGING TOOLS. I CHECK BATTERY FUNCTION AT SURFACE- I BATTERY NOT FUNCTIONING. CHANGE OUT BATTERY FOR MEMORY LOGGING TOOLS-2-HR DELAY PROGRAMMED PLUS 15-1/2-HRS OF BATTERY LIFE=17-1/2-HRS OF LOGGING I 'TIME AVAILABLE. 01:30 - 02:45 1.25 EVAL X DFAL 12,595.00 • OTHCMP RIH WITH MEMORY GR/CCUSCMT ON 1"CS H DRIL FRC)M fIFRRICK FINISH MU&RIH WITH MEMORY LOGGING I BHA. I BHA CONSISTS OF LOGGING TOOSL, ' PORTED SUB,1/2"CIRC SUB,5/8"HYD DISCONNECT,XO,29-JTS OF 1"CSH,XO,3/4" I HI LOAD DISCONNECT, DBPV,XO,2-HTS OF 2-1/16"CSH,XO, BAKER QUICK CONNECT, XO,CTC. OAL=994.03' 02:45 - 05:15 2.50 EVAL X DFAL 12,595.00 OTHCMP STAB ON INJECTOR HEAD AND RIH WITH I MEMORY LOGGING BHA TO 9400'. RIH AT 80-FPM AT.5-BPM WITH 1100-PSI. 05:15 - 06:30 1.25 EVAL X DFAL 12,595.00 OTHCMP CONTINUE TO RfH FROM 9400'TO 10510', WITHOUT CIRCULATION AND LOGGING AT I 30-FPM. I CORRECT AT EOP FLAG(-33.5')-CTDS FROM 10,495.5'TO 10462'. DISCUSS WITH WSL AND CTD ENGINEER- AGREE TO RIH TO 10520'ON CTDS. i RIH TO 10510'AND SEE SLIGHT SET DOWN. PAINT YELLOW"NO GO"FLAG. Printed 4/28/2011 4:37:48PM North America -ALASKA- BP Page 6 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date 1 From-To Hrs i Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:20 0.83 EVAL X DFAL 12,595.00 OTHCMP POH,LOGGING UP AT 30-FPM,FROM 10510' TO 9400'. CIRCULATE ACROSS THE TOP OF THE WELL, NO LOSSES NOTED. 07:20 - 08:20 1.00 EVAL X DFAL 12,595.00 OTHCMP PUMP 40.5-BBLS OF 50 DEGREE 2%KCL DOWN COIL @1.38 BPM/2765-PSI. CLOSE IN CHOKE AND BULLHEAD 6-BBLS OF 50-DEGREE 2%KCL. UNABLE TO BULLHEAD FURTHER WITHOUT EXCEEDING 2500-PSI. • OPEN CHOKE. 08:20 - 09:25 1.08 EVAL X DFAL 12,594.97 OTHCMP RIH FROM 9400'TO 10462',MEMORY LOGGING SMCT/GR/CCL AT 30-FPM. 09:25 - 10:00 0.58 EVAL X DFAL 12,594.97 OTHCMP POH,MEMORY LOGGING, FROM 10462'TO 10300'. PAINT ORANGE/BLUE EOP FLAG. CONTINUE TO POH FROM 10300'TO 9400'. 10:00 - 11:45 1.75 EVAL X DFAL 12,594.97 OTHCMP POH FROM 9400'TO SURFACE,PUMPING DOWN COIL. FLOW CHECK WELL-STATIC. 11:45 - 14:45 3.00 EVAL X DFAL 12,594.97 OTHCMP HOLD PJSM ON LAYING DOWN BHA& LOGGING TOOLS. TAG UP AND UNSTAB INJECTOR. LD MEMORY LOGGING BHA,STANDING BACK 1"CSH IN DERRICK. 14:45 - 16:45 2.00 EVAL X DFAL 12,594.97 OTHCMP HOLD PJSM ON CUTTING COIL. CUT 800'OF COIL IN 5'SECTIONS. CLEAN&CLEAR RIG FLOOR FROM COIL CUTTING OPERATIONS. 16:45 - 17:15 0.50 EVAL X DFAL 12,594.97 OTHCMP INSTALL BAKER EXTERNAL SLIP TYPE COIL CONNECTOR. PULL TEST CONNECTOR TO 36K-LBS-GOOD TEST. PRESSURE TEST CONNECTOR TO 4100-PSI- GOOD TEST. 17:15 21:30 4.25 EVAL X DFAL 12,594.97 OTHCMP WAIT ON ORDERS FROM CTD ENGINEERING GROUP. RECIEVE APPROVED PROCEDURE ADDENDUM#4. 21:30 - 00:00 2.50 EVAL X DFAL 12,594.97 OTHCMP BRING FISHING BHA COMPONENTS TO RIG FLOOR AND INSPECT. BTT GET 5P B X PH6 P XO FROM SHOP FOR MU QUICK CONNECT. • CONFIRM ALL COMPONENTS FIT FOR PURPOSE-DRIFT FOR DISCONNECT BALL. 4/22/2011 00:00 - 01:00 1.00 EVAL X DFAL 12,594.97 OTHCMP HOLD PJSM ON MU LINER FISHING BHA. DISCUSS PLAN FORWARD, POSITIONS OF PEOPLE,AND COMPONENTS OF BHA. MU LINER FISHING BHA. BHA CONSISTS OF- 4"GS SPEAR,1/2"CIRC SUB,5/8" DISCONNECT, BI-DIRECTIONAL JARS,3-EA WEIGHT BARS,ACCELERATOR JAR, DBPV, XO,2-JTS OF 2-3/8"PH6 TBG,XO, BAKER QUICK CONNECT,AND XO. 01:00 - 01:30 0.50 EVAL X DFAL 12,594.97 1 OTHCMP MU TO CTC AND STAB ON INJECTOR. HOLD AAR-HIGHLIGHT IMPORTANCE OF COMMUNICATION BETWEEN RIG FLOOR AND OPS CAB WHILE STABBING INJECTOR Printed 4/28/2011 4:37:48PM "orth America-ALASKA- BP Page 7 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM I Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA 'UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) NPT NPT Depth Phase Description of Operations (hr) (ft) Date 01:30From 03:30 2.00 EVAL X Code DFAL j 12,594.97 OTHCMP RIH WITH LINER FISHING BHA AT 80-FPM. PUMP AT.5-BPM WITH 780-PSI. • CLEAR RIG FLOOR OF CUT COIL SECTIONS. AT 8694'EOP FLAG(8796.64'WITH BHA)= SEE CTDS READING OF 8800'(MECHANICAL COUNTER READING 8692') WOULD BE A -3.36'CORRECTION WT CHECK AT 9400'-PU WT=34K-LBS, SO WT=21K-LBS WT CHECK AT 9600'-PU WT=35K-LBS,SO WT=21K-LBS 03:30 - 04:00 0.50 EVAL X DFAL 12,594.97 OTHCMP CONTINUE TO RIH TO TAG LINER TOP AT 9706' SET DOWN 10K-LBS AND PUMP PRESSURE INCREASE TO 850-PSI. SHUT DOWN PUMP,PU SLOWLY AND ALLOW JARS TO RELAX FOR 5-MINUTES. PULL MAX PULL OF 72K-LBS SEVERAL TIMES WITHOUT ANY MOVEMENT OF LINER. SET DOWN 10K-LBS AND PUMP AT 1.7-BPM WITH 3100-PSI TO RELEASE GS SPEAR. 04:00 - 06:20 2.33 EVAL X DFAL 12,594.97 OTHCMP POH WITH LINER FISHING BHA FROM 9706' AT 50-FPM. PUMP AT.95-BPM WITH 1140-PSI. PAINT YELLOW&ORANGE EOP FLAG AT 9000' EOP UNCORRECTED. CONTINUE TO POH WITH LINER FISHING BHA at 80-FPM,PUMPING AT 1-BPM WITH • 1310-PSI. 06:20 - 07:00 0.67 EVAL X DFAL 12,594.97 OTHCMP ,TAGGED AT SURFACE AND FLOW CHECK } - ELL 07:00 07:45 0.75 EVAL X DFAL 12,594.97 I OTHCMP LAY DOWN BHA/CLEAN FLOOR AND WOO 07:45 - 08:00 0.25 J EVAL X DFAL 12,594.97 OTHCMP CONDUCT PARTED PIPE DRILL 08:00 - 15:30 7.50 j EVAL X DFAL 12,594.97 OTHCMP WAIT ON ORDERS-RECEIVE OPS NOTE#5 AND GET SERVICE PERSONNEL MOBILIZED I tTO LOCATION 15:30 - 19:00 3.50 STCTPL X DFAL j 12,594.97 'i OTHCMP PJSM TO PU JET CUTTER AND GET BELOW TREE. - — fJET CUTTER BHA. i 19:00 - 20:00 1.00 STCTPL X DFAL 12,594.97 OTHCMP CONFIRM BHA COMPONENTS AND STAB ON INJECTOR. 120:00 - 23:00 , 3.00 , STCTPL X DFAL 12,594.97 I OTHCMP RIH WITH JET CUTTER BHA AT 90-FPM. CIRCULATE AT.4-BPM WITH 1300-PSI. TIE INTO FLAG PAINTED FROM MEMORY LOGGING RUN-EOP COUNTER READS 8539' VS 8509'EOP CORRELATED DEPTH-APPLY -30'CORRECTION. CONTINUE TO RIH TO 10450'. ELL AN' '•._ •► ■ ; •" . Printed 4/28/2011 4:37:48PM 'forth America -ALASKA- BP Page 8 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site:PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 23:45 0.75 STCTPL X DFAL 12,594.97 OTHCMP GET BASELINE RATES AND PRESSURES. .3-BPM WITH 1140-PSI AND 1-BPM WITH 3000-PSI. PERFORM FIRING SEQUENCE PER SLB TCP REP. NO INDICATION OF FIRING ON SHOT DETECTOR,SMALL BOBBLE IN WEIGHT INDICATOR. { SHUT DOWN PUMPS TO RESET FIRING SEQUENCE. DECIDE TO PERFORM SEQUENCE AGAIN. PERFORM FIRING SEQUENCE PER SLB TCP REP AGAIN WITHOUT ANY INDICATION OF FIRING. 23:45 - 00:00 0.25 STCTPL X DFAL 12,594.97 OTHCMP POH WITH JET CUTTER BHA. PUMPING AT 1-BPM WITH 2900-PSI. 4/23/2011 00:00 - 01:45 1.75 STCTPL X DFAL 12,594.97 OTHCMP TPOH WITH JET CUTTER BHA AT 90-FPM. CIRCULATE AT 1-BPM WITH 2900-PSI 01:45 - 02:15 0.50 STCTPL X DFAL 12,594.97 OTHCMP BUMP UP IN INJECTOR AND FLOW CHECK- I STATIC. HOLD PJSM WITH RIG CREW ON STANDING BACK LUBRICATOR&LD BHA. DISCUSS POSITIONS OF PEOPLE AND THE IMPORTANCE OF COMMUNICATION THROUGHOUT THE JOB. POP OFF WELL AND STAND BACK INJECTOR. 02:15 - 03:30 1.25 STCTPL X DFAL 12,594.97 OTHCMP LD JET CUTTER BHA&STAND BACK 1"CSH TUBING. I MU SAFETY JT AND SECURE WELL TO LEAVE LAST JT OF 1"CSH TUBING IN WELL TO KEEP JET CUTTER BELOW WELLHEAD. '03:30 - 04:00 0.50 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM WITH RIG CREW ON HANDLING OF POTENTIALLY UNFIRED JET CUTTER. ,LD SAFETY JT AND LAST JT OF 1"CSH. JET CUTTER FIRED. LD SPENT CUTTER. 04:00 - 04:30 0.50 STCTPL X DFAL 12,594.97 OTHCMP CLEAN AND CLEAR RIG FLOOR. 04:30 - 05:30 1.00 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM ON MU LINER FISHING BHA. DISCUSS RUNNING ORDER, DROPPED OBJECT POTENTIALS AND WELL CONTROL CONSIDERATIONS. MU LINER SECTION FISHING BHA.4BHA CONSISTS OF 4"GS SPEAR,1/2"CIRC SUB, 5/8"HYD DISCONNECT,JARS, DBPV,XO, 2-JTS OF 2-3/8"PH6 TBG,XO,BAKER QUICK CONNECT AND XO. OAL=81.23' 05:30 - 07:30 2.00 STCTPL X DFAL 12,594.97 OTHCMP PU INJECTOR AND MU COIL TO BHA. RIH WITH LINER SECTION FISHING BHA TP 9600'AT 90-FPM,CIRCULATING AT.4-BPM WITH 730-PSI. 07:30 - 10:00 2.50 STCTPL X DFAL 12,594.97 OTHCMP WT CHECK AT 9600'-pu WT=35K-LBS AT 8-FPM,CIRCULATING AT.5-BPM. CONTINUE TO RIH AND LATCH FISH AT 9705'. !WORK STRAIGHT PULL UP TO 75K-LBS-NO MOVEMENT SEEN. JAR ON LINER-NO MOVEMENT SEEN. 10:00 - 12:10 2.17 STCTPL X DFAL RELEASE C SPEAR — —+-- II 12,594.97 OTHCMP FLOW CHECK WELL-STATIC. POH WITH LINER FISHING BHA 12:10 - 12:30 0.33 STCTPL X DFAL 12,594.97 OTHCMP TAG UP IN INJECTOR AND FLOW CHECK WELL-STATIC. UNSTAB INJECTOR. Printed 4/28/2011 4:37:48PM "orth America -ALASKA- BP Page 9 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth' Phase Description of Operations (hr) (ft) 12:30 - 14:30 2.00 STCTPL X DFAL 12,594.97 OTHCMP POH&LD LINER FISHING BHA. STAND BACK 1"CSH IN DERRICK 14:30 - 15:30 1.00 STCTPL X DFAL 12,594.97 OTHCMP STANDBY FOR SLB TCP TO ARRIVE ON LOCATION WITH JET CUTTER. 15:30 - 18:30 3.00 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM WITH RIG CREW AND SLB ON RUNNING JET CUTTER. MU JET CUTTER BHA. BHA CONSISTS OF- JET CUTTER,5/8"DISCONNECT,XO,21-JTS OF 1"CSH,XO,3/4"DISCONNECT, DBPV,XO, 2-JTS OF 2-1/16"CSH,XO,QUICK CONNECT, XO AND CTC. OAL=726.98'. 18:30 - 19:10 0.67 I STCTPL X DFAL 12,594.97 OTHCMP STAB ON INJECTOR AND BLOW DOWN KILL LINE. 19:10 - 21:30 2.33 STCTPL X DFAL 12,594.97 OTHCMP RIH WITH JET CUTTER BHA AT 90-FPM CIRCULATING.4-BPM WITH 1030-PSI. TIE-IN TO MEMORY LOGGING FLAG. APPLY 39.05'CORRECTION TO PUT CUTTER ON DEPTH WITH LOG. CONTINUE TO RIH WITH JET CUTTER BHA TO 10225'AT 50-FPM CIRCULATING AT.4-BPM WITH 1030-PSI. PU AND PARK CUTTER ON DEPTH AT 10 205' PU WT=35K-LBS. 21:30 - 22:15 0.75 STCTPL X DFAL 12,594.97 OTHCMP ESTABLISH BASELINE RATES&PRESSURES FOR E FIRE SEQUENCE. '.3-BPM WITH 900-PSI AND 1-BPM WITH 2900-PSI. ,PERFORM FIRING SEQUENCE PER SLB TCP _ REP. SEE SLIGHT INCREASE IN STRING WEIGHT BUT NO INDICATION ON SHOT DETECTOR. REPEAT FIRING SEQUENCE PER SLB TCP REP. NO INDICATION OF TOOL FIRING. 22:15 - 00:00 1.75 STCTPL X DFAL 12,594.97 OTHCMP POH WITH JET CUTTER BHA FROM 10205'AT 50-FPM IN 3-1/16"LINER AND THEN 80-FPM TO SURFACE. CIRCULATING AT 1-BPM WITH 2950-PSI. 4/24/2011 00:00 - 00:15 j 0.25 STCTPL X DFAL 12,594.97 OTHCMP POH WITH JET CUTTER BHA. 00:15 - 01:45 1.50 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM ON STAND BACK INJECTOR AND LD JET CUTTER BHA. BUMP UP IN LUBRICATOR AND FLOW CHECK -STATIC. STAND BACK LUBRICATOR. LD JET CUTTER BHA,STANDING BACK 1" CSH IN DERRICK. 01:45 - 02:15 0.50 j STCTPL X DFAL 12,594.97 OTHCMP SECURE WELL WITH 1-JT OF 1"CSH IN WELL IN ORDER TO HAVE PJSM WHILE LEAVING JET CUTTER BELOW WELLHEAD. HOLD PJSM ON LD JET CUTTER (POTENTIALLY UNFIRED) LD SAFETY JOINT,SINGLE JT OF 1"CSH AND DISCOVER JET CUTTER DID NOT FIRE. SEND CUTTER OUT FOR INSPECTION BY TCP I I REP. Printed 4/28/2011 4:37:48PM 'orth America -ALASKA- BP Page 10 of 12 • Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor:NORDIC CALISTA UWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) 02:15 - 04:30 2.25 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM ON CUTTING 105'OF COIL_ RU HYDRAULIC CUTTER AND CUT 105'OF COIL IN-5'SECTIONS. INSTALL BOOT ON ELINE. BTT INSTALL EXTERNAL SLIP TYPE CTC. PULL TEST CONNECTOR TO 35K-LBS-GOOD. PRESSURE TEST CONNECTOR TO 3500-PSI- GOOD. HOLD AAR ON CUTTING COIL AND REHEADING-NO ISSUES NOTED,JOB WENT VERY WELL. SLB TCP REPORTS E-FIRE TOOLDOWNLOAD SHOWS SYSTEM SHUT DOWN FOR UNKNOWN REASON AT 1844-HRS. SLB CHANGES OUT E-FIRE HEAD,BATTERY AND TOOL. WSL WITNESS PRE-RUN TOOL TESTING. 04:30 - 06:00 1.50 STCTPL X DFAL 12,594.97 OTHCMP HOLD PJSM ON MU JET CUTTER BHA. DISCUSS ORDER OF MU, RESTRICTING ACCESS TO THE CELLAR AND POSITIONS OF PEOPLE. MU JET CUTTER BHA. 06.00 - 06:30 0.50 STCTPL X DFAL 12,594.97 OTHCMP FINISH MAKING UP JET CUTTER BHA-PU AND STAB INJECTOR 06:30 - 07:55 1.42 STCTPL X DFAL 12,595.00 OTHCMP RIH W/NEW FIRING HEAD ON JET CUTTER 07:55 - 08:20 0.42 STCTPL X DFAL 12,595.00 OTHCMP STOP AT FLAG DEPTH=9172.6/CORRECT TO 9131.1 =-41.5 CORRECTION - CONTINUE TIH TO 10225-PU TO 10205 AND INITIATE FIRING SEQUENCE 08:20 - 08:50 0.50 1 STCTPL I X DFAL 12,595.00 OTHCMP FIRING SEQUENCE COMPLETE-GOOD INDICATION OF FIRING ON WEIGHT INDICATOR AND SLB SHOT INDICATOR 08:50 - 10:20 1.50 STCTPL X DFAL I 12,595.00 OTHCMP FLOW CHECK WELL-POH WITH JET CUTTER BHA 10:20 - 11:30 1.17 STCTPL X DFALi 12,595.00 OTHCMP TAG AT SURFACE-PJSM TO STAND BACH 1" ICSH AND LAY DOWN JET CUTTER BHA- CONDUCT SAID OPERATIONS-JcT CUTTER HAD FIRED 11:30 - 13:15 1.75 STCTPL X DFAL 12,595.00 OTHCMP PJSM AND MU FISHING BHA CONSISTING OF:4"GS SPEAR, HYDRAULIC DISCONNECT, 2 3/8 BI-DIRECTIONAL JARS,(3)2 7/8 SPIRAL DRILL COLLARS,2 3/8 ACCELERATOR,DUAL BPV,(2)2 3/8 PH6, BTT UQC,CTC 13:15 - 13:55 0.67 STCTPL X TDFAL 12 595.00 OTHCMP FINISH MU BHA AND PU AND STAB INJECTOR 13:55 - 15:40 1.75 STCTPL i X DFAL 12,594.97 OTHCMP TIH W/4"GS SPEAR TO FISH 23/8 LINER. 15:40 - 17:30 1.83 STCTPL X DFAL 12,594.97 OTHCMP WT CHECK AT 9600'WHILE CIRCULATING AT .35-BPM. PU WT=33K CONTINUE TO RIH TO TAG FISH AT 9706'. ENGAGE GS SPEAR. COMMENCE JARRING BOTH UP AND DOWN • TO 72K-LBS(LIMITED BY COIL STRENGTH). NO MOVEMFNT SFFN RELEASE GS SPEAR. 17:30 - 19:10 1.67 STCTPL X DFAL 12,594.97 OTHCMP POH WITH FISHING BHA. 19:10 - 20:30 1.33 STCTPL X DFAL 12,594.97 OTHCMP TAG UP IN INJECTOR. FLOW CHECK WELL-STATIC. • UNSTAB INJECTOR. LD FISHING BHA 20:30 - 21:00 0.50 STCTPL X DFAL / 12,594.97 OTHCMP CLEAN AND CLEAR RIG FLOOR. Printed 4/28/2011 4:37:48PM -Forth America -ALASKA- BP Page 11 of 12 Operation Summary Report Common Well Name: 02-12 AFE No Event Type: COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA UWI:500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 21:30 0.50 DHEQP P POST HOLD PJSM FOR MAKING UP NOZZLE BHA. MU NOZZLE BHA. BHA CONSISTS OF- NOZZLE,DBPV,2(EA)5'STINGERS AND CTC. STAB ON INJECTOR 21:30 - 23:30 2.00 DHEQP P POST RIH WITH NOZZLE BHA AT 80-FPM TO 9650'. CIRCULATE AT.36-BPM WITH 750-PSI WHILE RIH. WT CHECK AT 9650'. PU WT=32K-LBS. 23:30 - 00:00 0.50 DHEQP P POST DISPLACE WELL TO CLEAN 8.4-PPG 2%KCL AT 2-BPM WITH 2450-PSI. PRESSURE SLOWLY CLIMBS TO 3000-PSI. REDUCE RATE TO 1.8-BPM 4/25/2011 00:00 - 02:00 2.00 DHEQP P POST CONTINUE TO DISPLACE WELL TO CLEAN 8.4-PPG 2%KCL AT 1.8-BPM WITH 2900-PSI. 02:00 - 03:30 1.50 DHEQP P POST POH`WITH NOZZLE BHA AT 100-FPM TO 1250', CIRCULATING AT.75-BPM WITH 420-PSI. 03:30 - 03:45 0.25 DHEQP P •r I POST AT 1250',CONTINUE TO POH AT 5-FPM TO COMPLY WITH FLUID MANAGEMENT POLICY - WHILE BRINGING MORE 2%KCL ON BOARD. 03:45 - 04:00 0.25 DHEQP P POST FINISH POH WITH NOZZLE BHA FROM 1250'. HOLD PJSM WITH RIG CREW ON LD NOZZLE BHA WHILE FINISHING POH. 04:00 - 04:15 0.25 DHEQP P POST BUMP UP IN INJECTOR. FLOW CHECK WELL-STATIC. POP OFF OF WELL AND STAND BACK ti INJECTOR. }-- LD NOZZLE BHA. 04:15 - 04:45 0.50 DEMOB P }, POST HOLD PJSM ON LD 1"CSH AND REDRESS LITTLE JERKS. 04:45 - 06:00 1.25 DEMOB P POST FUNCTION TEST CROWN-A-MATIC-RIH WITH 1"CSH FROM THE DERRICK. 06:00 - 08:30 2.50 DEMOB P POST CREW CHANGE PJSM AND CONTINUE TO RIH W/1"CSH 08:30 - 12:00 3.50 DEMOB P'. ' POST ALL CSH IN HOLE-PJSM AND POH/LD 1" ,CSH-AAR FOR ACIVITY 12:00 - 13:30 1.50 DEMOB P POST 1 ALL CSH OUT OF HOLE 13:30 - 14:00 0.50 DEMOB P POST :MU FREEZE PROTECT TOOLS 14:00 - 15 1.00 DEMOB ; P POST STAB INJECTOR AND R/U LRS TO PUMP FREEZE PROTECT 1-15:00 15:30 ! 0.50 DEMOB P I POST PJSM W/LRS FOR PUMPING DIESEL 15:30 - 17:15 1.75 DEMOB P POST RIH TO 2500'AND DISPLACE WELL WITH 66 BBLS OF DIESEL-DENSITY OUT OF 6.7#/GAL I AND SHUT DOWN 17:15 - 17:45 j 0.50 DEMOB P POST RD/MO LRS AND SPOT N2 PUMPER AND START TO COOL DOWN 17:45 - 18.15 0.50 r DEMOB P POST W/O CREW CHANGE TO PUMP N2 18:15 - 20:30 2.25 DEMOB P POST HOLD PJSM ON PUMPING NITROGEN. PURGE COIL WITH NITROGEN TO FLOWBACK TANK. BLEED PRESSURE OFF. ' UNSTAB INJECTOR,LD NOZZLE AND SET • BACK INJECTOR• 20:30 - 21:30 '', 1.00 WHSUR P POST rHOLD PJSM WITH GREASE CREW ON GREASING TREE. GREASE TREE.i ---- - - ---- -__-- ------------.-- Printed 4/28/2011 4:37:48PM - ''xth America-ALASKA- BP Page 12 of 12 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:4/18/2011 End Date:4/26/2011 X3-00YL6-C(1,189,306.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1977 12:00:00AM !Rig Release:4/26/2011 Rig Contractor: NORDIC CALISTA IUWI: 500292027700 Active Datum:02-12 @56.00ft(above Mean Sea Level) Date From-To Hrs 1 Task l Code ' NPT ' NPT Depth Phase I Description of Operations Ti 30 - 23:30 - 2.00 WHSUR P (ft) t POST HOLD PJSM WITH CIi2MHILL DSM LUBRICATOR CREW. PU&MU LUBRICATOR. FILL TREE WITH MEOH. TEST LUBRICATOR AGAINST MASTER VALVE TO 250-PSI LOW AND 3500-PSI HIGH. TEST LUBRICATOR AGAINST SWAB VALVE TO 250-PSI LOW AND 3500-PSI HIGH. ! HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TESTS. OPEN MASTER AND SWAB VALVES. 23:30 - 00:00 0.50 WHSUR P POST DSM LUBRICATE IN BPV. CLOSE MASTER,SWAB AND SSV. LD LUBRICATOR 4/26/2011 00:00 - 00:30 0.50 BOPSUR P POST BLOW DOWN CHOKE AND KILL LINES. DRAIN BOP STACK IN PREP FOR ND. 00:30 - 02:00 1.50 WHSUR P 4• POST HOLD PJSM ON RD 2"COIL. CUT OFF COIL CONNECTOR, BEVAL CUT FOR GRAPPLE AND INSTALL GRAPPLE. SPOOL GRAPPLE CABLE ONTO WINCH DRUM AND PULL TEST GRAPPLE. GOOD TEST. 02:00 - 03:30 : 1.50 WHSUR P POST HOLD PJSM ON SPOOLING 2"COIL BACK FROM INJECTOR TO REEL. f SPOOL CABLE BACK ONTO REEL. INSTALL SHIPPING BAR. ;SECURE COIL TO SHIPPING BAR USING DUAL [CLAMPS AND CHAIN. CUT EXCESS COIL OFF I !OF REEL. UNLOAD 1"CSH FROM PIPE SHED WHILE SECURING COIL. 03:30 - 04:15 0.75 RIGD P POST HOLD PJSM ON RD INJECTOR. i REMOVE LUBRICATOR EXTENSION AND PACKOFF. RD INJECTOR HEAD. 04:15 - 06:00 1.75 BOPSUR P POST HOLD PJSM ON CHANGING OUT RAMS IN i BOPE FOR NEXT WELL. ' 1DISCUSS WORKING AT HEIGHTS,PROPER RAM SELECTION,AND IMPORTANCE OF ' ;GOOD COMMUNICATION. I 12 BARRIERS FOR OPENING BOP RAM DOORS ARE 1)TESTED MASTER VALVE AND 2) !TESTED SWAB VALVE. SSSV IS CLOSED BUT UNTESTED. BPV IS SET BUT UNTESTABLE. OPEN BOP DOORS AND CHANGE OUT RAMS TO CONFIGURATION FOR NEXT WELL. 06:00 15:00 9.00 BOPSUR P POST CONTINUE WD BOPS,INSTALL AND TEST TREE CAP. RELEASE RIG AT 15:00. ALL FURTHER ENTRIES ON WELL 02-21 Printed 4/28/2011 4:37:47PM EMI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 02 02-12 500292027700 02-12C Survey: MWD Survey Report - Geographic 18 April, 2011 Qbp En BAKER Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: 02-12 @ 56.00ft(generic drilling rig) Site: PB DS 02 MD Reference: 02-12 @ 56.00ft(generic drilling rig) Well: 02-12 North Reference: True Wellbore: 02-12C Survey Calculation Method: Minimum Curvature Design: 02-12C Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37ft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44ft Longitude: 148°28'58.060 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.43 ° Well 02-12 API No 500292027700 Well Position +N/-S 0.00 ft Northing: 5,950,398.10 ft Latitude: 70°16'9.557 N +E/-W 0.00 ft Easting: 687,641.24 ft Longitude: 148°28'56.819 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 30.00 ft Wellbore 02-12C API No 500292027703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (') (1 (nT) BGGM2010 4/5/2011 21.73 80.99 57,660 Design 02-12C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,119.43 Vertical Section: Depth From(TVD) +N/-S +E!-W Direction (ft) (ft) (ft) (°) 26.00 0.00 0.00 130.90 Survey Program Date: 4/18/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 720.00 9,761.00 1 :Camera based mag multi sho(02-12) CB-MAG-MS Camera based mag multi shot 9,845.00 10,119.43 MWD(02-12B) MWD MWD-Standard 10,132.00 12,598.00 MWD(02-12C) MWD MWD-Standard 4/18/2011 3:45:19PM Page 2 COMPASS 2003.16 Build 73 faiit •AKIR HUOKIS Survey Report- Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: 02-12 @ 56.00ft(generic drilling rig) Site: PB DS 02 MD Reference: 02-12 @ 56.00ft(generic drilling rig) Well: 02-12 North Reference: True Wellbore: 02-12C Survey Calculation Method: Minimum Curvature Design: 02-12C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,119.43 34.71 259.93 8,796.06 -3,066.44 2,496.61 5,947,395.04 690,213.37 70°15'39.394 N 148°27'44.174 W TIP 10,132.00 34.86 261.02 8,806.38 -3,067.62 2,489.54 5,947,393.68 690,206.33 70°15'39.383 N 148°27'44.379 W KOP 10,143.49 35.01 262.00 8,815.80 -3,068.59 2,483.03 5,947,392.54 690,199.85 70°15'39.373 N 148°27'44.569 W 10,160.49 35.87 250.00 8,829.67 -3,070.98 2,473.51 5,947,389.92 690,190.39 70°15'39.350 N 148°27'44.846 W 10,178.01 39.18 239.00 8,843.58 -3,075.59 2,463.93 5,947,385.07 690,180.93 70°15'39.304 N 148°27'45.125 W 10,205.51 41.30 219.89 8,864.65 -3,087.07 2,450.61 5,947,373.26 690,167.90 70°15'39.191 N 148°27'45.512 W' 10,237.06 42.47 197.74 8,888.27 -3,105.31 2,440.63 5,947,354.79 690,158.38 70°15'39.012 N 148°27'45.803 W 10,267.76 47.68 181.42 8,910.02 -3,126.61 2,437.18 5,947,333.40 690,155.46 70°15'38.803 N 148°27'45.904 W 10,295.98 54.71 174.15 8,927.70 -3,148.55 2,438.10 5,947,311.50 690,156.92 70°15'38.587 N 148°27'45.877 W 10,323.02 61.77 168.80 8,941.94 -3,171.25 2,441.54 5,947,288.89 690,160.93 70°15'38.364 N 148°27'45.777 W 10,355.19 67.67 160.74 8,955.69 -3,199.26 2,449.22 5,947,261.09 690,169.31 70°15'38.088 N 148°27'45.554 W 10,385.11 70.66 154.80 8,966.33 -3,225.12 2,459.80 5,947,235.50 690,180.53 70°15'37.834 N 148°27'45.246 W' 10,414.59 73.70 155.35 8,975.36 -3,250.57 2,471.63 5,947,210.35 690,192.99 70°15'37.583 N 148°27'44.902 W 10,444.78 76.92 163.21 8,983.02 -3,277.86 2,481.94 5,947,183.33 690,203.97 70°15'37.315 N 148°27'44.603 W 10,475.04 78.74 161.74 8,989.40 -3,306.07 2,490.84 5,947,155.35 690,213.58 70°15'37.037 N 148°27'44.344 W 10,506.08 79.93 150.84 8,995.16 -3,333.95 2,503.10 5,947,127.79 690,226.52 70°15'36.763 N 148°27'43.988 W 10,541.97 83.45 141.27 9,000.36 -3,363.36 2,522.91 5,947,098.88 690,247.06 70°15'36.474 N 148°27'43.411 W 10,576.89 83.64 137.39 9,004.29 -3,389.67 2,545.52 5,947,073.14 690,270.32 70°15'36.215 N 148°27'42.754 W 10,605.59 84.02 133.30 9,007.37 -3,409.97 2,565.57 5,947,053.36 690,290.87 70°15'36.015 N 148°27'42.170 W 10,634.02 84.32 130.23 9,010.26 -3,428.80 2,586.66 5,947,035.05 690,312.42 70°15'35.830 N 148°27'41.557 W 10,672.46 85.00 128.09 9,013.84 -3,452.97 2,616.34 5,947,011.63 690,342.69 70°15'35.592 N 148°27'40.694 W 10,702.90 86.01 123.34 9,016.23 -3,470.68 2,640.97 5,946,994.55 690,367.75 70°15'35.418 N 148°27'39.977 W 10,736.57 87.14 120.91 9,018.24 -3,488.55 2,669.43 5,946,977.39 690,396.65 70°15'35.242 N 148°27'39.149 W 10,762.11 87.58 120.66 9,019.41 -3,501.61 2,691.35 5,946,964.89 690,418.88 70°15'35.114 N 148°27'38.512 W 10,795.97 86.71 126.53 9,021.10 -3,520.31 2,719.51 5,946,946.89 690,447.50 70°15'34.930 N 148°27'37.693 W' 10,829.93 86.59 128.08 9,023.09 -3,540.86 2,746.47 5,946,927.02 690,474.96 70°15'34.727 N 148°27'36.908 W 10,861.72 87.45 125.44 9,024.74 -3,559.85 2,771.90 5,946,908.67 690,500.86 70°15'34.540 N 148°27'36.169 W 10,890.64 85.48 119.27 9,026.53 -3,575.30 2,796.27 5,946,893.84 690,525.61 70°15'34.389 N 148°27'35.460 W 10,925.34 86.81 116.57 9,028.86 -3,591.50 2,826.86 5,946,878.40 690,556.59 70°15'34.229 N 148°27'34.570 W 10,960.79 88.53 111.74 9,030.30 -3,605.99 2,859.17 5,946,864.72 690,589.25 70°15'34.086 N 148°27'33.630 W 10,990.39 84.93 109.12 9,031.99 -3,616.31 2,886.86 5,946,855.10 690,617.18 70°15'33.985 N 148°27'32.825 W 11,020.41 84.99 106.50 9,034.63 -3,625.45 2,915.32 5,946,846.67 690,645.86 70°15'33.895 N 148°27'31.996 W 11,051.10 86.03 102.82 9,037.03 -3,633.19 2,944.92 5,946,839.67 690,675.64 70°15'33.819 N 148°27'31.135 W 11,086.82 84.83 102.36 9,039.88 -3,640.95 2,979.67 5,946,832.78 690,710.57 70°15'33.742 N 148°27'30.124 W 11,119.39 85.88 104.66 9,042.51 -3,648.54 3,011.23 5,946,825.98 690,742.31 70°15'33.667 N 148°27'29.206 W 11,150.93 88.31 106.81 9,044.11 -3,657.08 3,041.54 5,946,818.20 690,772.83 70°15'33.583 N 148°27'28.324 W 11,179.27 89.54 106.89 9,044.64 -3,665.29 3,068.66 5,946,810.67 690,800.14 70°15'33.502 N 148°27'27.535 W 11,208.20 91.05 105.79 9,044.50 -3,673.43 3,096.42 5,946,803.22 690,828.09 70°15'33.422 N 148°27'26.728 W 11,238.56 94.73 106.74 9,042.96 -3,681.92 3,125.52 5,946,795.46 690,857.39 70'15'33.339 N 148°27'25.881 W 11,275.40 97.18 112.65 9,039.14 -3,694.26 3,160.01 5,946,783.99 690,892.17 70°15'33.217 N 148°27'24.878 W 11,308.35 96.21 117.20 9,035.30 -3,708.05 3,189.67 5,946,770.94 690,922.17 70°15'33.081 N 148°27'24.015 W 11,338.03 94.92 120.21 9,032.42 -3,722.24 3,215.58 5,946,757.41 690,948.42 70°15'32.942 N 148°27'23.261 W 11,368.19 90.95 122.67 9,030.87 -3,737.94 3,241.27 5,946,742.35 690,974.49 70°15'32.787 N 148°27'22.514 W 11,406.48 84.25 124.00 9,032.48 -3,758.95 3,273.21 5,946,722.14 691,006.95 70°15'32.580 N 148°27'21.585 W 11,432.98 85.18 126.29 9,034.92 -3,774.14 3,294.79 5,946,707.49 691,028.89 70°15'32.431 N 148°27'20.958 W 11,462.14 87.39 126.73 9,036.81 -3,791.45 3,318.18 5,946,690.77 691,052.70 70°15'32.261 N 148°27'20.277 W 11,491.30 90.25 126.26 9,037.41 -3,808.79 3,341.61 5,946,674.03 691,076.56 70°15'32.090 N 148°27'19.596 W 11,523.90 91.41 122.26 9,036.93 -3,827.14 3,368.55 5,946,656.36 691,103.94 70°15'31.909 N 148°27'18.812 W 11,550.89 91.48 120.02 9,036.25 -3,841.09 3,391.64 5,946,642.99 691,127.38 70°15'31.772 N 148°27'18.141 W 11,580.25 91.07 114.75 9,035.60 -3,854.59 3,417.69 5,946,630.14 691,153.76 70°15'31.639 N 148°27'17.383 W 11,609.67 90.06 111.71 9,035.31 -3,866.19 3,444.72 5,946,619.22 691,181.07 70°15'31.525 N 148°27'16.596 W 11,643.56 90.61 108.60 9,035.11 -3,877.86 3,476.53 5,946,608.34 691,213.16 70°15'31.410 N 148°27'15.671 W 11,672.00 89.51 104.01 9,035.08 -3,885.85 3,503.82 5,946,601.04 691,240.63 70°15'31.331 N 148°27'14.877 W 4/18/2011 3:45:19PM Page 3 COMPASS 2003.16 Build 73 Phi RAKER HUGHES Survey Report-Geographic 0 bp I NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: 02-12 @ 56.00ft(generic drilling rig) Site: PB DS 02 MD Reference: 02-12 @ 56.00ft(generic drilling rig) Well: 02-12 North Reference: True Wellbore: 02-12C Survey Calculation Method: Minimum Curvature Design: 02-12C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,700.72 89.42 99.45 9,035.35 -3,891.68 3,531.93 5,946,595.91 691,268.88 70°15'31.274 N 148°27 14.059 W 11,735.23 90.09 94.02 9,035.50 -3,895.73 3,566.19 5,946,592.72 691,303.23 70°15'31.234 N 148°27'13.063 W 11,767.05 90.95 89.60 9,035.21 -3,896.73 3,597.98 5,946,592.51 691,335.03 70°15'31.224 N 148°27 12.138 W 11,804.17 90.37 84.11 9,034.78 -3,894.70 3,635.03 5,946,595.47 691,372.02 70°15'31.244 N 148°27 11.060 W 11,838.84 89.23 78.97 9,034.90 -3,889.60 3,669.31 5,946,601.42 691,406.16 70°15'31.294 N 148°27'10.062 W 11,869.98 90.18 79.16 9,035.06 -3,883.69 3,699.89 5,946,608.08 691,436.57 70°15'31.352 N 148°27'9.173 W 11,899.74 90.52 81.81 9,034.88 -3,878.77 3,729.23 5,946,613.73 691,465.79 70°15'31.400 N 148°27'8.319 W 11,940.48 91.54 87.73 9,034.15 -3,875.06 3,769.78 5,946,618.45 691,506.22 70°15'31.436 N 148°27'7.139 W 11,970.48 90.15 92.04 9,033.70 -3,875.00 3,799.77 5,946,619.26 691,536.20 70°15'31.437 N 148°27'6.267 W 12,001.07 90.34 96.74 9,033.57 -3,877.34 3,830.26 5,946,617.68 691,566.74 70°15'31.413 N 148°27'5.380 W 12,030.43 90.34 101.43 9,033.40 -3,881.98 3,859.24 5,946,613.77 691,595.83 70°15'31.368 N 148°27'4.536 W 12,061.93 90.31 102.56 9,033.22 -3,888.52 3,890.05 5,946,608.00 691,626.79 70°15'31.303 N 148°27'3.640 W 12,092.02 90.31 99.03 9,033.06 -3,894.16 3,919.61 5,946,603.10 691,656.47 70°15'31.248 N 148°27'2.780 W 12,122.72 90.64 94.95 9,032.80 -3,897.89 3,950.07 5,946,600.13 691,687.02 70°15'31.211 N 148°27'1.894 W', 12,152.96 90.09 91.51 9,032.61 -3,899.60 3,980.26 5,946,599.17 691,717.24 70°15'31.194 N 148°27'1.016 W 12,190.63 90.00 86.29 9,032.58 -3,898.87 4,017.91 5,946,600.84 691,754.85 70°15'31.201 N 148°26'59.920 W. 12,220.13 90.15 82.54 9,032.54 -3,896.00 4,047.26 5,946,604.44 691,784.13 70°15'31.229 N 148°26'59.066 W 12,250.69 90.37 78.30 9,032.40 -3,890.92 4,077.39 5,946,610.27 691,814.11 70°15'31.279 N 148°26'58.190 W 12,279.75 90.09 74.74 9,032.29 -3,884.15 4,105.64 5,946,617.75 691,842.19 70°15'31.345 N 148°26'57.368 W 12,309.58 90.21 71.49 9,032.21 -3,875.48 4,134.18 5,946,627.12 691,870.50 70°15'31.430 N 148°26'56.537 W 12,342.76 90.46 67.68 9,032.02 -3,863.91 4,165.27 5,946,639.46 691,901.29 70°15'31.544 N 148°26'55.632 W 12,373.86 91.41 69.67 9,031.51 -3,852.60 4,194.24 5,946,651.48 691,929.97 70°15'31.655 N 148°26'54.789 W 12,403.58 89.45 72.86 9,031.28 -3,843.06 4,222.38 5,946,661.73 691,957.86 70°15'31.749 N 148°26'53.971 W 12,444.83 87.88 77.63 9,032.25 -3,832.56 4,262.24 5,946,673.22 691,997.45 70°15'31.852 N 148°26'52.811 W 12,475.03 87.79 81.11 9,033.39 -3,826.99 4,291.90 5,946,679.52 692,026.95 70°15'31.906 N 148°26'51.948 W 12,506.03 90.49 84.96 9,033.85 -3,823.24 4,322.66 5,946,684.04 692,057.61 70°15'31.943 N 148°26'51.053 W 12,533.92 90.21 88.32 9,033.68 -3,821.60 4,350.50 5,946,686.37 692,085.39 70°15'31.959 N 148°26'50.243 W 12,570.02 90.37 92.99 9,033.50 -3,822.01 4,386.58 5,946,686.86 692,121.48 70°15'31.955 N 148°26'49.193 W 12,598.00 90.37 92.99 9,033.32 -3,823.47 4,414.52 5,946,686.09 692,149.44 70°15'31.940 N 148°26'48.380 W TD-2318" 4/182011 3.45:19PM Page 4 COMPASS 2003.16 Build 73 'WELLHEAD= FAX 02 -12C SAFETY I S:**WELL ANGLE>70°@ 10408' ACTUATOR= AXELSON DRLG DRAFT KB.ELEV= 56.0' BF.ELEV= KOP= 3100' 20"CONDUCTOR. 80' 2218' —15-1/2"OTIS ROM SSSV NIP,ID=4.562" Max Angle= 93"@ 10991' 1--C71 Datum MD= 10192' 94#,H-40, x Datum TVD= 8800'SS ID=19.124' 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT — 2386' k x 9425' IH5-1/2"OTIS SLIDING SLV,ID=4.562" 13-318"CSG,72#,N-80 BUTT,ID=12.347" — 2702' 9511' 1-15-1/2"OTIS XN NIP, ID=4.455" 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD 7793' ' I 9544' H5-1/2"BKR SBR EXTENSION,ID=7 9599' --19-5/8"X 5-1/2"BKR SAB PKR.ID=4.875' 5-1/2"TBG,17#,N-80 AB-MOD, —I 9599' 1----- .0232 bpf,ID=4.892" I 9605' H6'BKR MILLOUT EXTENSION,ID=? _-r__ 9611' I—6-5/8"X 4-1/2"XO,ID=3.958" Minimum ID (02-12C)= 1.78" @ 9704' 9672' 41/2"OTIS XN NIP 3" x 2.25" Deployment Sleeve /MILLED TO 3.80"(06/13/07) 9(448 .96$8'' --13.7"Deployment Sleeve,ID=3" I _ ' 9726' I—3-1/2"BOT LNR DEPLOY SLV, ID=3.00" 9731' —3-1/2"SR RN.ID=2.992" I TOP OF CEMENT(06121!07) -1 9726' 9745' I—3-1/7'HOwcO X NIP,ID=2.813"1 3-1/2"LNR,9.3#, L-80 STL,.0087 bpf,ID=2.992" —I 9778' ► p- 9778' J—3-112 X 3-3/16"XO, ID=2.786" ► ►� 9816' I-14-1/7'SHEAROUT SUB,ID=? TOP OF CEMENT 9-5/8"CSG H 9910' ►� N 9817' H4-1/2"WLEG,ID=3.958" BEHIND 41 t2"TBG,12.6#,N 80 BUTT, — 9817' :�;:� •"4• 9800' 1-ELMD TT LOGGED 12/28/77 CT LINER ••l ••• 0152 bpf,ID=3958" \ 4••••4 •'e�i •••••4 •• # 2-7/8"LNR STUB H 9899' i••••• •• 9-5/8"CSG,47#,J8L-95 HARD 10501' s••••••N f •••••' 1 ' Jet Cut(4/23/11) H 10205' I ID=8.681" • 9-5/8"ML LOUT WINDOW(02-12B) 9848'-9855' Jet Cut(4/22/11) H 10435' I tt I 34° (3-3/16"Packer Whipstock H 10130' 10540' TOC in Lnr 3-3/16"LNR,6.2#,L-80 TC-II, .0076 bpf,ID=2.80" I II PERFORATION SUMMARY Ill 2-3/8"LNR,4.6#,L-80,.0039 bpf,ID=1.941" ,..1,2•61131- REF 698 REF LOG:MCNL ON 06/21/07 ��� ANGLE AT TOP PERF:88°@ 10830' t�4 11175' H3-3/16"BKR CIBP(01/07/08) I 125 Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL OpniSqz DATE 11763' —3-3/16"X 2-7/8"XO, 2" 6 10830-11080 0 06/21/07 ID=2.387" 2" 6 11240- 11694 C 06/21/07 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,ID=2.441" — 11766' DATE REV BY COMMENTS DATE REV BY COMMENTS I PRUDHOE BAY UNrr 01/30/78 PKR 141 ORIGINAL COMPLETION 04/03/03 JAD/PJC PERF LOG CORRECTION(3/28/08) WELL: 02-12C 11/15/95 N3S CTD SIDETRACK(02-12A) 01/11/11 AER PROPOSED CTD SIDETRACK PERMIT No: # 211025 06/22/07 N4ES CTD SIDETRACK(02-12B) -1:26/11 Nordic 2 CTD Sidetrack(02-12C) API No: 50-029-20277-03-01 01/08/08 RMH/SV SET CIBP(01/07,108) SEC 36,T11 V,R14E,804'FNL 8 895'FWL 02/15/08 GLM/PJC DRLG DRAFT CORRECTIONS 02/20/08 JLW/TLH CIBP/DIAGRAM CORRECTIONS BP Exploration(Alaska) g a 0 E o S (.).0 !t y 0%0)2 o 0 N C N m 0 L 26E4.1 Ucay f%0 oby �`....40a_ gp 1V4. pUm 0 aVvp mo VV JJ u N a m co 5• • \/ .{,�, moo N ma O - .1. --.S2--S .� 2g r- yyT`. Y.t z U U �.\ Zh ` Q N Q • -- -...:z s$aamrT. P, 0, olO O 0050a00N0 0 • slrnJJ 1 oc.97 r Q 0 2• "A ....__ , _ , c 4 8. 1 (r1 WCt(3 0... 0 o �d MO z J Cow• �J x w "JWQM C' O "` o— V— is `O W-YOO'a 0 O 2 Z t Q.UO O 2a I a 0 a �zaiz.V'z X4,2 o r �1-Z Q wl r0.0 ¢ u00 U_ oa O 1-OOw20220m2022 a NKK,UJ W W R'00 W W m a U f a 2 2 a N N a 2 2 Z 2 --.1.0....m...... -NyyON 0.-0SOipO$9OOOOO N c 99990 9 909 m o y¢r '�Smm2=Sr 60 m , w x 00 m v w w 0 O v O w a a m m m n a m O O,,O,O J 2 mmmmmmmmmmmmmm 0 yWIZ (/ g o W C d c r m G N*1 J • Yum,U 2, - .,1,,,„.700.m..-..‹ 3 U T o O a 0 m w VJ ,4aNN a7 Nt0G1 2 o C :9 a a�aoyzoJ�aaa oo Va ° gL • N a m C C G �m N d m m LAI <,I1 , Q H Q Q !.911158 m a m SligfE O [F ALSEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-12C BP Exploration (Alaska), Inc. Permit No: 211-025 Surface Location: 804' FNL, 894' FWL, SEC. 36, T11N, R14E, UM Bottomhole Location: 4628' FNL, 5262' FWL, SEC. 36, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy�P. Foerster Commissioner DATED this ZZ day of February, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA IREC E I V ALA, _OIL AND GAS CONSERVATION COM. .ION � .� 7�� ��6// PERMIT TO DRILL 20 AAC 25.005 1a.Type8 Q �I. �g Cps. i "i,',. = , of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj 0 Single Zone 1 c. pecify it well is pr..... .'. ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coal coalatleittlfGas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 02-12C 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12605' TVD 8979'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Govemmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028308 804'FNL,894'FWL,SEC.36,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3988'FNL,3253'FWL,SEC.36,T11 N, R14E, UM March 26,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4628'FNL,5262'FWL, SEC.36,T11N, R14E, UM 2560 27,500' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 56' feet 15.Distance to Nearest Well Open Surface: x- 687642 y-5950398 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 770' 16.Deviated Wells: Kickoff Depth: 10150 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3221 Surface: 2378 • 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.6# L-80 STL 2025' 9710' 8455' 12605' 8979'ss 53 sx 15.8 ooa Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 11766' 9027' 11175' 11729' 9024' None Casing Length Size Cement Volume MD TVD Conductor/Structural 109' 20" 255 sx Arcticset 109' 109' Surface 2702' 13-3/8" 7200 sx Arcticset 2702' 2702' Intermediate 9848' 9-5/8" 1000 sx Class'G' 9848' 8577' Production Liner 2040' 3-1/2"x 3-3/16"x 2-7/8" 111 sx Class'G' 9726'-11766' 8469'-9027' Perforation Depth MD(ft): 10830'-11080' Perforation Depth ND(ft): 9014'-9011' 20.Attachments: 0 Property Plat ®BOP Sketch IN Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Jacob Leemhuis,564-4989 Printed Name :lip •' . Title Engineering Team Leader Prepared By Name/Number Signature �� Phone 564-4711 Date2 /4-fir Elizabeth Barker,564-5674 Commission Use Only Permit To Drill API Number: Permit Dpte: See cover letter for Number: aJ/&3. " 50-029-20277-03-00 \k other requirements Conditions of Approval: If box is checkgdOwell may beused to explore for,test,or produce coalbedmethane,thgas hydrates,or gas contained shales: lEr Other: ' 3 SO D /0`Sy �'7 Samples Req'd: ❑Yes m No Mud Log Req'd: Oyes 11�No 41-2,06 ion.:, An st. � 74(fla. A)H2S Measures: 0'Yes 0 No Directional Survey Req'd: t 'Yes 0 No a ' APPROVED BY THE COMMISSION Date 2 -2_2 -(f Z / ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 tfl �KKfr1! 11AL royal(20 AAC 25.005(g)) Su In Duplicate w 424/16/ii a-•Zadi To: Alaska Oil & Gas Con. .rvation Commission From: Jacob Leemhuis 0 by CTD Engineer Date: February 3, 2011 Re: 02-12C Permit to Drill request Approval is requested for a permit to drill a CTD sidetrack from well 02-12B. Well 02-12B was drilled in July 2007 as a CTD sidetrack targeting Z1B/2A in southern region of DS2. The well was completed with 250' of Z1B and 485' of Z2A perforations. The 3-3/16" liner lap failed the initial pressure test to 2050 psi (lost 200 psi in 10 min) and a liner top packer was installed. After installing the liner top packer, the liner lap passed a pressure test to 2030 psi. The well is currently shut in for high GOR. In August 2007, borax CNL and STP logs were run to identify the gas source and evaluate potential gas shut-off options. The borax log indicated no channels behind pipe. The STP log showed equal flow contributions from the 2 perforation / intervals but a cooling anomaly was detected on the flowing and residual temperature passes at 11,320' in the Z2A perforations indicating a likely source of gas entry. The GOC was predicted in mid-Z2A but many of the offset wells have coned GOC picks. It is likely that 02- 12B is experiencing a comparable coning affect. In July 2008, a CIBP was set at 11,175' to shut-off the Z2A perforations at the toe of the well. There '/ are still open perforations from 10,830' to 11,080'. In August, 2010, a caliper was run from 10,460' to surface. All tubulars were in good shape. However, it did show slight corkscrew throughout the 3-3/16" liner. The MIT-IA passed to 3,000 i psi and MIT-OA passed to 2,000 psi. The proposed plan for 02-12C is to drill a through tubing sidetrack with the SLB/Nordic 2 Coiled Tubing Drilling rig on or around March 26, 2011. The existing perforations will be isolated by setting the 3-3/16"packer whipstock, as well as the primary cement job. The sidetrack, 02-12C, will exit the existing 3-3/16" liner and kick off in Ivishak,tagging HOT in Z1B and drilling 2,075' of lateral. The completion will be 2-3/8" Carbon Liner. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. CTD Sidetrack Summary Pre-Rig Work: (scheduled to begin March 1, 2011) 1. 0 MIT-IA to 3000 psi; MIT-OA to 2000 psi. 2. S Pull LTP 3. S Dummy WS drift 4. F Load & kill well prior to setting WS. Freeze protect well to 2000' TVD. 5. E Set 3-3/16" Packer WS at 10,130' MD. 270 degrees orientation 6. W Test: PPPOT-T. Torque LDS 7. V PT MV, SV, WV 8. 0 Blind and bleed lines, remove well house, level pad 9. V Set TWC —24 hrs prior to rig arrival Rig Work: (scheduled to begin on March 26, 2011) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mill 2.74" window at 10,130' and 10' of rathole. Swap the well to GeoVis. 3. Drill Build: 3" OH, 400' (35 deg/100 planned)with resistivity 4. Drill Lateral: 3" OH, 2,075' (12 deg/100 planned) with resistivity 111AA1 5. Run 2-3/8" carbon liner leaving TOL at 9710' F7D 6. Pump primary cement leaving TOC at 9720', 11 bbls of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNL/GR/CCL log • 8. Test liner lap to 2400 psi. 9. Perforate 1,000' 10. Freeze protect well, RDMO Post-Rig Work: 1. Re-install well house and attach production lines 2. Pull BPV 3. Run GLV as needed 4. Test separator (-1,000' of perfs) Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Geo Vis for milling window and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 2,475 MD of 3" hole Casing Program: • 2-3/8" STL, 4.6 pounds per foot, L-80 solid liner—9,710' MD to 12605' MD. • A minimum of 11 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9,720' MD. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90.19°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—27,500 ft. • Distance to nearest well within pool—770 ft to 02-03B Logging • MWD directional, Gamma Ray and resistivity will be run over all of the open hole section. • Cased hole GR/CCUMCNL logs will be run. Anti-Collision Failures • 02-03B—706.21 ft. ctr-ctr, Currently producing • 02-35A—429.83 ft ctr-ctr, Currently producing Hazards • No planned crossings of faults. • There are no wells on DS2 with H2S > 100 ppm Reservoir Pressure • The reservoir pressure 2-12C is expected to be 3221 psi at 8,8C rDSS. (7.04 ppg equivalent). • Maximum expected surtat,e pressure with gas(0.10 psi/ft)to surface is 2378 psi. Jacob Leemhuis CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble lc TREE_•I FMC SAr'TY NOTES:**WELL ANGLE>70°@ 10408' ACTUATOR= AXELSON 02 -12B MIN N OF 1.81" COLLAR @ 11729' HAS * KB.ELEV= 56.0' BF.ELEV= KOP= 3100' Max Angle= 93°@ 20"10991' 2218' H5-1/2"OTIS RQM SSSV NIP,ID=4.562" CONDUCTOR, 80' Datum MD= 10192' 94#,H-40, Datum TVD= 8800'SS ID=19.124' 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT — 2386' , x 9425' —5-1/2"OTIS SLIDING SLV,ID=4.562" 13-3/8"CSG,72#,N-80 BUTT,ID=12.347" — 2702' 9511' 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD —1 7793' i 5-1/2"OTIS XN NIP,ID=4.455" 1 7 9544' —15-1/2"BKR SBR EXTENSION,ID=? 5-1/2"TBG,17#,N-80 AB-MOD, —1 9599' 9599' —9-5/8"X 5-1/2"BKR SAB PKR, ID=4.875" .0232 bpf, ID=4.892" �t 9605' —6'BKR MILLOUT EXTENSION,ID=? 9611' —6-5/8"X 4-1/2"XO,ID=3.958" Minimum ID (02-12B) = 2.30" @ 9720' ij ' 9672' —4-1/2"OTIS XN NIP SEAL ASSY IN KB LNR TOP PKR MILLED TO 3.80"(06/13/07) 9720' — KB LNR TOP PKR, ID=2.30"(DRIFTED 01/07/08) �i_ jill9726' —3-1/2"BOT LNR DEPLOY SLV, ID=3.00" TOP OF CEMENT(06/21/07) —1 9726' ii 9731' —13-1/2"STL PIN, ID=2.992" 9745' —3-1/2"HOWCO X NIP,ID=2.813" 3-1/2"LNR,9.3#,L-80 STL, .0087 bpf, ID=2.992" — 9778' 9778' —13-1/2"X 3-3/16"XO, ID=2.786" • 9816' H4-1/2"SHEAROUT SUB,ID=? TOP OF CEMENT 9-5/8"CSG — 9910' ► • 9817' I-14-1/2"WLEG, ID=3.958" BEHIND v. .**1- 9800' H ELMD TT LOGGED 12/28/77 CT LINER 4-1/2"TBG,12.6#,N-80 BUTT, H 9817' •• '••••• • .0152 bpf,ID=3.958" •••• �•••• •••• o•••• • :•: 0•• 9-5/8"MILLOUT WINDOW(02-12B) 9848'-9855' 2-7/8"LNR STUB 9899' ••••• •• ,• \• 'i!•••• • • ••4•••/•••••. •• ••••_••►••. ` 11175' —3-3/16"BKR CIBP(01/07/08) 9-5/8"CSG,47#,J&L-95 HARD, 10501' •••• ►••••• ••• ►•• ID=8.681" •••••••••' ►••••• ••••• ••• i•••••♦• ►•• • ♦••••••• �•♦ ••••••••♦ ♦� 11763' 13-3/16"X 2-7/8"XO, •••••••••••••••••••1 •re e. =2.387' ••• •••••••••••••1 M •� •••••••••••• NI PERFORATION SUMMARY REF LOG:MCNL ON 06/21/07 I �•�•• ANGLE AT TOP PERF:88°@ 10830' I ••••i•••4 Note:Refer to Production DB for historical perf data PBTD — 11729' SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10830-11080 0 06/21/07 3-3/16"LNR,6.2#,L-80 TC-II,.0076 bpf, ID=2.80" 11763' 2" 6 11240- 11694 C 06/21/07 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf, ID=2.441" H 11766' DATE REV BY COMMENTS ', DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/30/78 PKR 141 ORIGINAL COMPLETION 04/03/08. JAD/PJC.PERF LOG CORRECTION(3/28/08) WELL: 02-12B 11/15/95- N3S CTD SIDETRACK(02-12A) PERMIT No: 2070580 06/22/07 N4ES CTD SIDETRACK(02-12B) API No: 50-029-20277-02 01/08/08 RMH/SV SET CIBP(01/07/08) SEC 36,T11 N,R14E,804'FNL&895'FWL 02/15/08 GLM/PJC DRLG DRAFT CORRECTIONS 02/20/08 JLW/TLH CIBP/DIAGRAM CORRECTIONS BP Exploration (Alaska) TREE_* FMC SAI-TY NOTES:**WELL ANGLE>70*@ 10408' _WELLHEAD= FMC O 2 1 2 C ** :3-3/16" LANDING COLLAR @ 11729' HAS ACTUATOR_= AXELSON _ MIN lu OF 1.81"** KB.ELEV= 56.0' BF.ELEV= 1 KOP .,_= --3100-- __ Max Angle= 93°@ 10991' 2218' —15-1/2"OTIS RQM SSSV NIP, ID=4.562" 20"CONDUCTOR, — 80' Datum MD= -1016- 019 0 Datum TVD= 8800'SS 94#,H-40, x ID=19.124' 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT H 2386' %< x 9425' H5-1/2"OTIS SLIDING SLV,ID=4.562" 13-3/8"CSG,72#, N-80 BUTT, ID=12.347" H 2702' / 9511' H5-1/2"OTIS XN NIP,ID=4.455" 9-5/8"CSG,47#, N-80 BUTT XO TO J&L-95-HARD H 7793' I I I 9544' H5-1/7 BKR SBR EXTENSION,ID=? 5-1/2 TBG,17#, N-80 AB-MOD, H 9599' • —I95/8'X5-12'B<ZSQBRQ�X4875' .0232 bpf, ID=4.892" 9605' j—6'BKR MILLOUT EXTENSION, ID=? r.-______I 9611' —16-5/8"X 4-1/2"XO,ID=3.958" Minimum ID (02-12B) = 2.30" @ 9720' 4-1/2"OTIS XN NIP SEAL ASSY IN KB LNR TOP PKR r—II 1MILLED TO3.80"(06/13/07) —23/8"Liner Top9= � 12'B�I�L7F?D=1.75' 9720' RTOC =' = 9726' 3-1/2"BOT LNR DEPLOY SLV,ID=3.00" 19731' H3-1/2'STL PIN,ID=2.992" TOP OF CEMENT(06/21/07) H 9726' j 11 9745' H3-1/2"/2"HOWCO X NIP, ID=2.813" 1 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf, ID=2.992" H 9778' Ip p- 1 9778' —13-1/2"X 3-3/16"XO, ID=2 786" I > 4 } 9816' H4-1/2"SHEA ROUT SUB,ID=? TOP OF CEMENT 9-5/8"CSG H 9910' ►4 i > 9817' _H4-1/2"WLEG,ID=3.958" BEHIND �•. y. CT LINER 4-1/2"TBG,12.6#, N-80 BUTT, —1 9817' �•4.•4 �G�• 9800' HELMD TT LOGGED 12/28/77 .0152 bpf, ID=3.958" \ ::::$ ::,� • +V 4.2 f 44if f 2-7/8"LNR STUB H 9899' •••••••••4 ••,• 9-5/8"CSG,47#,J&L-95 HARD, H 10501' \;••;••;••;•;•- ID=8.681" �•�•�•�•�•' • 9-5/8"MILLOUT WINDOW(02-12B) 9848'-9855' 34° iii ,, 3-3/16"Packer Whipstock \\‘‘ L 2-3/8"LNR.4.6#. L-80. .0039 bpf.ID=1.941"H 12605' 1 3-3/16"LNR,6.2#,L-80 TC-II, .0076 bpf,ID=2.80" / PERFORATION SUMMARY 0 ✓ i�I; 11175' H3-3116"BKR CIBP(01/07/08) REF LOG: IVCNL ON 06/21/07 ,it ANGLE AT TOP PERF:88°@ 10830' 1 Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE 11763' —3-3/16"X 2-7/8"XO, 2" 6 10830-11080 0 06/21/07 ID=2.387" 2" 6 11240-11694 C 06/21/07 2-7/8"LNR,6.4#, L-80 STL, .0058 bpf, ID=2.441" —I 11766' LDATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/30/78 PKR 141 ORIGINAL COMPLETION 04/03/08 JAD/PJC PERF LOG CORRECTION(3/28/08) WELL: 02-12C 11/15/95 N3S CTD SIDETRACK(02-12A) 01/11/11 AER PROPOSED CTD SIDETRACK PERMIT No: XXXXXXXXX 06/22/07 N4ES CTD SIDETRACK(02-12B) API No: 50-029-20277-0: 01/08108 RMI-1/SV SET CIBP(01/07/08) SEC 36,T11 N,R14E,804'FNL&895'FWL 02/15/08 GLM/PJC DRLG DRAFT CORRECTIONS 02/20/08 JLW/TLH CIBP/DIAGRAM CORRECTIONS BP Exploration (Alaska) s M 0 0 LL) r 0 0 0 N 0 O) 0 N. N 0 0 O CO CO 0 0 (O CO O N 0 a Q) O O O (O O O O 6 O O) O h O O CA COI. O O) f; (O 6) U, O) m3 co R o LLv i�y� • i— o co N. 4 co .— N M M 4 M co CO N 0) LL d• n (D a0 O N CO O d' (D co O d' x— f,- O) d' d' 6 )O C) N 6) CO n )f) N N d' (O co O co co T I I V O 6) C) O O O O C) O) O O 0 N c N N N N N N N N N M M M M () .O o 2). O ' ON C f0 () fn N CO Z Z o d• O O O O O O O O O O 0 1 J (O 7 Q 0 (6 0 O O O 0 0 O O O o O N co 0 a0 O l0 t0 (O (O O U) (O O N CO CO co co co co co Nm 7 c0 ,..,O O C N E d 0 p C) m J N O N 7 C Q Q ; 520 ~ .2 W y n (D N N C) N. CO n CO (O 0) 0) p CO d• CO LO CO CO (D CO CO CO d• N C) C C C9 '- (O O to N O LLn dM N- M ` t 0 m CO (D CO CO O d N CON N- COCO N N Cr) O O O O O O O O O O O O d 2 4' .t: O O O O O CO O O O O O CO O WC CO "" (O (D (O (D (D CD (D CO CO (O (D (O (O Lit O W Cd•_ C7 -. u) 12 C) 0 0) 3 N k' CC a. V M 0 f- N (O co n (D r Q tV ` w 0 NO O O r N CO CO CO to CO O r O w y C1 U N E U) d• N O d' O N d• O (O (O O W (.) N n. T p CO M CO") CO CO N N CO CO 0 LO 0 CO O O CO d t m a COm c 75 • Gwr Z :° Eaa t n n N- N- n N: o: n: N- N- o v d d• d d d v -4- d d d d d• O Q O = W r-- a) 6) o) O 6) 0) 6) a) O O CD 0) 0)J z co Q p CO m C w c 13 c Z U1- LC L 6' 6- o (O (O ui ui LOU, 6 t O @ ;a ° F— Q •:,. m CO O N LO O CO CO d• CO CO O Ce 0 1., N CO C7 d' CO N CO 0O CO CO N CO CO O O O M co Nv O ddO 0 O n Q, G U co co v v v v v v v N- COoLO CO CO :13N N N N N N N N N N N N N CI) 7 < I— o CL 0 Wd' N a0 co d' O (O � 0 0 N a co d' M co N CO N N d: N d' n CO CO N 2 O n 6 d' O r (O O d' (O d' 6 co E co co co co 4 O cocoN coO co co p) (p 0 O O O O N N CO M d• d• d• C} Z Q u) M M C? M C? M M M C? M M M M CL C 0 Q Z �' F• O 2 2 N O n cc d' co CO N d' O N- d' CO CO O n N CO CO O N n "O N CO N N O C[/ (O (O N N ti to M r M O O d' d• co O N O 0 CO CO d' d• U, O (/) h n ti CO CO CO CO CO CO O CO CO O (/) CO W CO 6 CO CO W W CO CO CO CO 6 N > E H E CO CO M co O o )O N CO O O co M d' co O CO d' co. d' d' O co O CO N e L O M O O co M d' N C') (O CO C) N O (O CO CO CO CO N. U, CL .0 ,ypp m....... N N N N m N r Q :.. 3 (.1 r O CV O CD to N so o (D CO CO J 3 N co h co CO N O N CO M Q CL r- d• Tr co co d• n f� N d' d• d O CO O 4 4 4 O O6 O )O 6 6 6 CO '. A O d• O CO CO M N CO (O N. n n CO CO J CO CO CO f0 CI J Q CI m C^.N O E . O O H O o OQO co O O -co Q - -C r O 2 m SP. Ol >A 4) Z d d 0 0 a 01 o ct O o O v co O O Q O O O O O O O N O O O co isfit 1 n. O �i 6) 'a O O Of O O O O O O O Cl O O O N CV W ` O O O .. O O O O O O O O O O p MalO E 3 OO 0 0 O a 13 CO M OdcodO CO O O CO l) t0 D CO 0 0 Oi en 5. m ° o - °) co Q o a o O o c o o o 6 6 6 6p c o O 6 1110co o.vo m F ° m Romd m = co �Z c� av33Q Cl) a %- (o /1 O CD 0 CO 0 O N O N O n �D O a0 O M O o0 N. )` CO i) r O CO co CO (') O 0) O 6) 00 0 O) 6) co O 0) a 0) M M O 0) 0) O 0) 0) O 6) O 0) D) O O O 0) O 0) co N IN 0) CO CO CO CO CO 0) CO CO CO M 6) 00 CO •CD CO CO 0 CO A e ((0 0 COO N N CO at 0) CO CO CO N CO N M O N CO of N O O CO CI- N CO N CO O O 0) CO N W CO of r sr 0) Q7 N 0) N CO a V N O co m O CO N CO O O W CO O CO CO O4 6 g N 0) CO O CON N N CO N N CO N 00 N O O O LO = V N N CO of CO CO CO N N CO 6) 0) O N N CO CO U 41M M M M cri cri cri cri M c M cri M M at of at at at 0 O O >• o U 0) a) CO• Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -I 11 = Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nffl 0 C N N N NN N N N N N N N N N N N N N NN • NE O r r r r r r r r r r r r r r r r r r r N (n m 3 ,-- CTC ) U r 7 C J y a) a) M M 0 N 0) 0) co O N N 0 co CO 0 at CO N a ,a M CO CO 0 0) M r CO 0 0 0 r CO 01 CO 0) CO M M 0 C 0 N N N 0) M M N CO 0) N O at N N CO M CO CO ` L CO 0) V' N N N CO N CO N CO co N 0) N 0) CO M at at CO CO CO N N CO 0) Cr) 0 _ N M M at w • C O O O O O O O O O O O O • 2 0) CO 0) 0) 0) 0) CO CO 0) 0) 6) 0) a) 0) 0) 0) 0) 0) 0) 0) C R ` CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO .d. 0 W u) 1:2 • C U 3 U C- C C dy„ it CO CO N aY CO M 0) 0) CO N CO at N 0 0 at 01 N O y t0 N CO at 0 0 CO 0 0 r N CO CO at CO 0) at V N CO N 0 R. 0 0 V y at O N N CO 0) CO M CO N CD 0) 4 Cr) I-- N N CO O CD w K >, R m CO CO 0 CO CO at CO 0 0) CO V' co o CO CO 0 CO N N N t0 L 0 d C 0) CO 0) CO CO CO CO CO N N N N IN CO CD CD Cr) Ill Cr) CO V p 't :± L -- M CO CO CO CO CO CO COCOCO(O COCD CO CO CO CO CO COi COi CO CO >> p = 4 at at v v v at at at ar .1- v v v v v v v - v -I F- 2 Z N p 0••••••• a) a) a) D) a) a) a) 0) CO CO 0) 0) 6) 0) 0) CO 0) 0) CO 6) Z COi (ri u) to ui CO tri Iri Cn tri CO to CO (n COi tri re Lri to (O 1 = L_/ 0 Ce2 O N co N11 CO M co CO O co co a . N 0 N 0 0 CO co Cf) CD CO CO at O r co 0) co N CO CO CO CO a{ Q) a{ CO 0) M N 4 N at CO O co CO N CO Cr) O CO ^ N CO V. CO CO N CO N N O) CO CD CO CO co �a. CO CO h. fr.... CO COO) O O r r N COCOCOCO CO CO N O Cl) 3 g N N N N N N N CO M M M M M M M M M M M M 1 < F_ a _o W UM N CO N N CD 0 CO CO CO CO N 0 N 0) CO 0 0 a N 0) N 0) N to N O N O 0 (O CO CO O CO at CO aF at m O CO 4 O 7 N 0) 4 N O N N N 0) CO M 7 0 0 N CD CON CO N N CO V N CO N 0 N CT Cr) Cr) Cr) Cr) CD CD CO (D CD N- N N N CO CO 00 0) 0) 0) CO CO CO M Ch C? M M M M M M M M (`7 ('�) a Z�- CD 0 CO CO CO 0) co NT CD N CO at CO CO at CO CO CD Nr CO CO at CO at CO CO Cr) O N CO at 0) O M CO CO O N N M at 4 Cr) CO Cr) CO N N N CO CO 0) 6) CO CO CO CO (0 CO CO CO CO CO CO CD CO O CD CO CO CD CO 0 (I) 0) 0) 0) CO 0) 0) CO 0) CO CO 0) CO 0) 0) 0) CO 0) 0) 0) 0) (A CO CO OD CO 00 CO CO CO CO CO W co- CO CO CO CO 6 W CO CO p F COW co N CO CO N 6) CO N CO N 0) 0) 0) 0) 0) CO 0) CO Cr) N N 0) CO M CO O N 0) O) T. Cr) N CO M 0) O C') O CO N 0 0) 0 0 0 0 N N 0) CO 0) 0 CO Q r r r r r r r r r r r r r r r r CL 1 (i) N N 0 0 N at at N N CO 0) 0 CO CO at N 0 0 0 Q a{ O CO CO CO CO of CO CA CO Cr) Cr) CD CO CO CD CO N N N CO N 0) 0) 0) 0) a) O) 6) 0) 0) 0) 0) O) 0) 0) 6) O) 0) 0) co CO CO co CO co CO co CO CO co co CO CO co CO CO co CO co CO U > ▪ a) E m N e Q 0 U 0 co ✓ v p a- mZ O CO o o d 0 0 0 0 0 0 0 C) 0 o O 0 0 0 O 0 C) 0 0 0 Q T O O O O O O O O CO O O O O O O O 0 O 0 0 N • > O O CrO O O O O CO O CO O Or CO O O O CrO CO re L. Cr) O CO 0 O at 0 O 0 CO 0 0 N 0 0 0 N 0 CO ai pAi� 7 N co co a) O O N N COCOof CS LC/ CO NCO CO a) 0� \I me ` W p O O O OO _ _ N M et CA r r t0 C 'p 2 r r rrrrr rra- `•-• a- r ra e- a- 01 'F 0E ?:d 00 m 00 Z 0 a. co a 0. md o rn( 00 CD v 0 CV o 0 0 o a ^ LO rn rn rn COCCO rn rn rn rn m 31 d C)�. CO riNz Re LL Cr N O CO CO (O N Cl CO 0 CO CO C/) d LO (n v, co (0 ' o) co 0 0 a V V N W (n coO N r 4 on NO CD V' (O LO CO(n CD r r oo a) a)) N g a a a v V Ni V V V V 0 O , C d O = = a o > o m U in a) Z Z 0 0 0 0 O 0 0 0 0 0 (n = < 0 0 0 0 O 0 0 0 0 0 N ay aa,, 0 1 N c CV CI CI CI CI CI CI CI - N V E (O O � m � af0 - N ,- 7 ,C .& Q O > 20 F- � WW .... N N CO N. V (O V V N 1- 0 •• N- 0r V O ti N CO CO N O V C 0 r e v on o v rn on C L fWO O w W () (O 1� 1�_ COW O Cl N N d 2 ."3" O O O O O O O O O O re C R ..r (O (D (D CO (O (D (D (O CD (O d O W C d tl l0 CC i () CD M (D N V CO N M M 1` O L. ` w t0 N N N- LC) M O O (O V n O w co d V y O O V CO r on (O N V (-a CD 4- X a m p) CO n O O N Cl N V 00 W IX ip L 0i d C (n (n (O LO CD CO CO CO CO c0 ra re C) c t r L^ (D CO (0 (0 O O (O (O co O O O O O C)) C)) Cr)VCr)V6V) OV) J• i- 2 Z C/) c O (O (n u) (n (C) C 6IC) (n (C Z N. O N CI) CO (D (n C's/ 0 O O n h (1') O M Cr (n O O O N- M a0 M N (D O ^ r n N. CO 0 V N- N- (D r a- N. COO O O N Cr) M C N 1 M M M M V v < /a o W a 11- CV (17 N r W COO 0 6N) COO t() CO r (O M N O V V O (n M C) N N 0 0 N r r CO N N O Cr) O O O CO CO CO W CO CO (6 CA .- CO) CO- CO- C7 M M M M M M a Z u) co <- (A CO O 0 n (n V r O O M O CO O N N O LL) (D O O O O O O CD N. N. N- N- N- n n N- N- (0 0) 6) C CD CO 0) rn rn a) a)G a6 00 06 ao O 0 aO coc6 a6 () N. O O O O O Cr) O O N CO a0 N 1` 1` n (D MO O r (C M M O CO N N- a0 6) CO N- (D (O co a" Q J CO N CO V N- CO O O N. n Q N N N N CO O a0 N- n W O O O O O CO co a6 co co co O O O O O O >. ▪ CO 0... co N C 0 < 6 0 r -0 N- a- C O D e m Cy N .2 un g Z 0 0.. 0 0 d >, O O O O O O O O O OtO c•-)■ 0 0 0 0 0 0 0 0 0 0 N N O O O U) O u) O O O O e- CO ..- O O O O O N- 0 0 0 0 p ,.NI 3 O N N M M V (O (D CO CS `■ C .. 'O CI•—•,., N ,- ,.N ,- ON .N- aN- .N- C O 3 a 2_ a a) c o m F 09. :.-. 000 co op Z 0a. u) 0 a mi Y s Ey - N 4g ,e u 8 u u 7 N N ^_ H , " S - $ 6 s 0 .,IN__ r © _ 8 F P I 8 N o. = M -4 ` r N le y e F yepi N \\ "' — O • O 31;46 aR s N y e N \\ „ ^ _ �i3tno3 . 3 1 / ffaSoi 8 23130 ; z 3 - - - s § .41 2 N p V-- --��`Y ry OO ty '.r.G < C p N v 1 v 8 - a c v m y '^ N e p '� WI F.N N OQ N O • ~ o ea 8 N C w F jpQ - 1 o $� _ 8 . 8a § § § 8 M E _ 8 8- ? c 02 (T/8 ooz)(+AWN/HIMos S 4 c s , c @4 sa"s' S ys $a 8 Fe O n 8 _ M f+ Hg U-21. �,m\smm ^NM.-mR P 1 N M e M 0 M mN k n 8. g$E1888888888888 vn ^ ."8"M8Ma8,15sE �E8M2F Z. I a s M a`aoo., I N d_v� °'_ �'$Si$888885888888$888 x - m N3 n gN oo^mu�'�NNciNNNNNrri aJ I I M a` a A 8 m m 3 c o ^$ .m$mmm.m m$� ..N�.£P,Yt �4, w v o Nn,-. N _/- G m uuE 24P-I mp�MOQ r`fNcigl NR<mvR ,li \ fn 33,,4 ,n ...$ RgQo,.. �B$Rmem8,-.-s��'iN 8 e N mmm ad mm °�RA -mmm g A C —... ,....- T." ., • m fi,g m 4 A PI fA A m m of mtam • fL Ze 14 �mg<�Fi8888 88�8i2 8 ▪A*x �.zmmmmmmmmmmm$bi N ild3oi • g:188228$.8 `&8`,&888882 000. .0.0.�I3^m gM m g 8 m g n & T T 3 $a" 0 N S • N M< m Milit SL)gidaQ poivan anlZ 7 /.iII BP ,, BAKER Travelling Cylinder Report �► by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12-Slot 12 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 02 MD Reference: 02-12B©56.00ft(coil) Site Error: 0.00ft North Reference: True Reference Well: 02-12 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 02-12C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-03-02-03-02-03 Out of range 02-03-02-03A-02-03A Out of range 02-03-02-03B-02-03B 11,464.52 12,566.00 706.21 0.60 705.98 Pass-Minor 1/100 02-04-02-04-02-04 Out of range 02-04-02-04A-02-04A Out of range 02-05-02-05-02-05 Out of range 02-05-02-05A-02-05A Out of range 02-05-02-05A-Plan#9 Out of range 02-05-02-05APB1 -02-05APB1 Out of range 02-06-02-06-02-06 Out of range 02-06-02-06A-02-06A Out of range 02-06-02-068-02-06B Out of range 02-08-02-08-02-08 Out of range 02-08-02-08A-02-08A Out of range 02-08-02-08APB1 -02-08APB1 Out of range 02-08-02-08B-02-08B Out of range 02-10-02-10-02-10 Out of range 02-10-02-10A-02-10A Out of range 02-10-02-10APB1 -02-10APB1 Out of range 02-10-02-10B-02-10B Out of range 02-11 -02-11 -02-11 Out of range 02-11A-02-11A-02-11A Out of range 02-12-02-12-02-12 10,135.22 10,200.00 151.31 20.58 133.60 Pass-Major Risk 02-12-02-12A-02-12A 10,748.66 10,650.00 7.46 1.77 6.58 Pass-Minor 1/10 02-12-02-12APB1 -02-12APB1 10,665.47 10,600.00 14.77 1.62 14.23 Pass-Minor 1/10 02-12-02-12B-02-12B 10,125.00 10,125.00 0.00 0.37 -0.33 FAIL-Major Risk 02-12_DIMS-02-12-02-12 Out of range 02-12_DIMS-02-12A-02-12A Out of range 02-12_DIMS-02-12B-02-12B Out of range 02-13-02-13B-02-138 Out of range 02-14-02-14-02-14 Out of range 02-14-02-14A-02-14A Out of range 02-14-02-14A-2-14A wp05 Out of range 02-15-02-15-02-15 Out of range 02-15A-02-15A-02-15A Out of range 02-15APB1 -02-15APB1 -02-15APB1 Out of range 02-20-02-20-02-20 10,800.00 10,300.00 1,177.83 959.22 218.67 Pass-Major Risk 02-21 -02-21 -02-21 11,750.00 10,825.00 1,111.32 461.35 681.94 Pass-Major Risk 02-21 -02-21A-02-21A 11,750.00 10,825.00 1,111.32 461.35 681.94 Pass-Major Risk 02-21 -02-21 B-Plan 3 11,750.00 10,825.00 1,111.32 461.37 681.92 Pass-Major Risk 02-27-02-27-02-27 Out of range 02-27A-02-27A-02-27A Out of range 02-33-02-33-02-33 Out of range 02-33-02-33A-02-33A Out of range 02-33-02-33B-02-33B Out of range 02-33_DIMS-02-33-02-33 Out of range 02-33_DIMS-02-33A-02-33A Out of range 02-33_DIMS-02-338-02-33B Out of range 02-34-02-34B-02-34B Out of range 02-35-02-35-02-35 10,210.00 10,768.00 925.78 409.95 731.51 Pass-Major Risk 02-35-02-35A-02-35A 10,145.37 11,630.00 429.83 17.81 416.34 Pass-Minor 1/100 02-35-02-35B-02-35B 10,390.00 12,150.00 778.63 491.86 304.69 Pass-Major Risk 02-35 DIMS-02-35A-02-35A Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 2/3/2011 10:40:36AM Page 3 of 26 COMPASS 2003.16 Build 73 Mall BP 414.4%BAKER HUGHES Travelling Cylinder Report INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12-Slot 12 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 02 MD Reference: 02-12B @ 56.00ft(coil) Site Error: 0.008 North Reference: True Reference Well: 02-12 Survey Calculation Method: Minimum Curvature Well Error: 0.008 Output errors are at 1.00 sigma Reference Wellbore 02-12C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-35_DIMS-02-35B-02-35B Out of range 02-40-02-40-02-40 Out of range 02-40-02-4OPB1 -02-4OPB1 Out of range PB DS 05 05-08-05-08A-05-08A Out of range 05-08_DO NOT USE-Plan 8,05-08A-Plan 8 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 2/3/2011 10:40:36AM Page 4 of 26 COMPASS 2003.16 Build 73 iv re 00 msa$$$$ $$ 9$ $n $ $$8$$ EW1 1- SRRR8AR8XRmPEPIA571 .g I 4 9! 0$88888$$$$$$8$88$8 E N 88 ! 3 E� 6i S1iv 4 7$w O$ i z w S1 331SiiSni113$El o1 ., 3' e33bbe3lphil3 qSHP ' tilI$ 3l33lliliS3 ' SSa1$ +# lipli ISHI8331,lz A = 4,- aIMSSI3I. 5S333355I3133335S 3513333333SII 31313II3I 332 % ; N j,i 338R�1�c.: " Ra3^v$f4w.m. 7 ! 4 -150, 4 !z Is w 94r;4S474 $,9, 7,S1SA ° $ a4 !Eir illiiii8imm8 m eo $ 8N 7 LL2 i s zStIMS;^$&q,,,,,mm.s°' v xmfMl S$ ,txgrAmmAgmmmmmgs igiz , sl 228$$$$$$$$888888$$8 ,1 18 gEEEIEggimmhi 3$ o 0 0 5 +,O N ELL 7Nu o O Na03 m C2mcc 'O� o RI w• aE, ♦ d U !d0a n3_ irtEi 14#4,44, 4•01 - 0' E U 4i- • .,,keN-4.044 : cr:v IPV16•11'o • O .V• i N A iiir II yoo ,9, 11.„... ,...,,,,„„ .0 LI1 la 1/1 0 OD 0 oA 5 6a_ ou.., � vimillyir 414/%4%%tilitiwiesp issi :!3 ae Q.Rm 3a � 0. 2 , / Ol -0 el lill'i I I I I 111111 , 4 I lirl n cs, c o U F c N CD A as N O 0 : . 1111ftimin 1111111 01 QqAN 3 7 t 816 El m - J liar m P ::„ . Yi =- U 4 ip 4a Ea ...„. . o E,vt.4 a . v Ea _ • -,��- �O �-_`-1 - • _ i.11 U U0 QIP C51 Ali. r. — a $ Y .:-.. g rirdi_________, c t �I a U _l f m co LI CO `o C7 1 2 .2 N V g 2 c .--z, MI - U ui J 2 U m Li I I I G a E Vinpayy Ce ¢ U U I S i 1 777 In Y I CI 0p I m _ n6,11a1 no v p N •N o. U m `L f C I11 U L 0 m m , p O 777 I • s ' m t Q 9 {j. . m m o 0 U • 15 Z $ z Q IC • f C7 r m♦ • •� -I 'I 2 C S U Mg Z ,77 c�l'u _ m O U U a U co my : Q V •• 2 • • f 2 E- aa J J N 2 O 2 JQ 2 • J O m n �M 24 � in 4. �� • - OV V N Z p V U Q IX a I `- D Y v / No Um 'R s,• "' 0 Z m z N f Lq 2 Z C> .0 U t co C-3 7u 771 U in, 2 / • • lb. ; N • O N IUIIn 2 C N I� U N o a 41 I II U 4. C' 0 E. 2 lei w Z f. a (J m 3 I- a til 6 i -o 7 IX (7 O it ° H Z U mX NI10 �► C c J ¢�Ud Q V r Ce C t Z Z 111m 1ice g 77 u O. X Alaska Department of Natural "esources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources 9 find Alaska DNR Case Summary File Type: ADL File Number: 28308 Printable Case File Summary See Township,Range, Section and Acreage? , New Search Yes Com' No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28308 ,tap Search for Status Plat Updates As of 02/16/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 25 Section Acres:640 Search Plats Meridian: U Township: 011N Range: 014E Section: 26 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 35 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 36 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-12911N14E UM 25,26,35,36 2560.00 U-3- 7 End of Case Summary Last updated on 02/16/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7,IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=2830... 2/16/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. .........._....._. _......... TRANSMITTAL LETTER CHECKLIST WELL NAME PTD# • ?IJ00.7% ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: i ,E'6/D//Gte- , POOL: /ae!/Dh/DE' Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 n -a 0 I- 'o CO c0i v 3 D m 3 3• 0 � N ui r 3 o NN 3 N m c) 'm M0 iv v /C cn�' D N N ay MCC O O O CD O CD .74 W W W W W W W W j W NN N N N N N IV N IN..) . . CO 00 --.10) c)) A W N -> 0 n CO CO -I C) 01 A W N O CO CO -I 0) 01 A W N -> O (0 CO 0) U7 A W N - O v M n WW0KF * no0000a, D �. va, Dnnnncnn Dgn -0 -000cn * * gCr- vZ , m 0 O 0 m m m m 0 .o 0 0' O 0 = o- °- m o- °) K K c o m = m m m co •0 -0 a c 0 0 (° d m o m m ° o m m m m �. -i i -I F = m m m _ _ _ N 0 r • as 3 s m x a m .o m a 3 < c 3 ° 0 3. -0 m 0 CD m m c!] O c c (o * < < n c CD p N O7 O O O aD 0 0 -0 t a o0i ca°n 0 D o __ 3 -0 �n a m a m a o o m ° n an 0 -, 0 0 o 0 - 5 a 0 0 ¢ c m < m 11 0 n)• 0 0 CD 0 m 0 0 m m o m m m 0 m m v o F m D 0• 0 a m 0 m X m m 0 0. y ° m � n' 0 0 0- 0- an. cn m n m n a a n Q m m 3 0- 0 < m m ,_ aJ o- as r O ° `< m a° o o c 0 -, m m N x 0 m a 2 a 9 * CD CD CD m `< m -0 P 5 0) m m o m = 3 ° 0 m n = ° < co m 0=Vcr m aa v m m w -o co _� y• N 0 m co m 3 a m D ° Qo m o _ o cfl m m p- m o o m ,r m m o o 0 a' 0 m m o 0 o m m m m m a n 0 _ m (D• c v' -° a ° co 0 3 m 0 3 a _0 0 0 0 m o 0 3 m o a a 'o m < a a D' 0 0 0 0 7- ° m c 'O 'O N O co A c o r. n 0 5. 7I - (p < a m N 7 a p ° o m o 0 m m * 0 0 m 0 0 n. O m m * o cnn o- D m Q °' o ° . N' m 0 Z 3 c° * ^ 0 v m o m - -0 c0 m m o m m o c 41 a CD a m 0) m o o Cr CD 0. 0 m o 0 0 3 a° a D 13 3' N 0 O N aS N m: °. N 3 0• N o O °' x 0 m a p .c.. .c.. 0 `< 7 0 CD 0 aT O D c o m ti N Q o m ? o o w o -C) c co 0 ° 2 ° D a o o" c a o oCi) o O -0 s N -o () ? m 0 xj m 93 o 0 _4 m > j 0 m °1 3 0 a - 3 '3 W D =O m o ° 3 m 0 3 a- m a m co 0 o CO 0 o C -o (D a o o m 0 a o a m m m N c cn O n w ° 0 I m 3 9° 0 , 0- 0, m e s m CO m 3 cn n CO m UI -o 0 oPW oWIIIV m 3 (y "' .N-. N M_ j C0 oo 0 a cr m ° as y A (O3 0 DC-D' C717 o c m c 2 iv cn o o a, o o N 0 c°) m O 3 ( 0 n' m 3 a m . o ? o F O Z j w m 0 rn m v L_ 3 o m m CD C� o 0 0 It o 0 0 ° Q 5 T y. o o O O m o CD z m oco 3 a CD tU - 0 - O n o w -.- 0 ,z 1-1 (Nn J D 0- 1 z z z z z z -< -< -< -< < < z < -< -< -< z z z z z z z z -< -< -< -< -< -< < -< -< -< < < z Z m \ DDDD0 D0 0 0 0 0 0 D0 0 0 0 DDDDD DDD O 0 0 0 O O 0 0 0 O O O D D Nv) uvvV1 (n (nNU) U L K z g Kg -ti v73 0 -003 (.00 CO 1.3 01 X CONw X 0 o Ro 3 a N N a CCO = o O N o p a) D m e Z < 0 ii 0 m 3 m a 0 N o n CD n (D a 3 a c '0 0 o 0 0 0 co ap O m N :N V b m d 7 N 7 7 a) a D cnco '< 0- N (n (O o m m y rn 0) m 7 (o 5 N c (0p u) j S DIV m mm mm v)a -u! - WO W m (na o W 0 F). cn W O aS a (n y O 7 N W IV W 0 � o Y N D O m 0 OZ m CO -< oO C-0 a ° J .Ca b ON > W _ 3 m A O c a v -I N co 'O (D 3 O -0 N 0 co O cn 0 m o. 0 c a) r.) o C o 7 N = m N a CD CD 0' 0 77 S -0 co o 0) (0 -O N -0 0 3 co 0 3 c0 o m 3 0 m 0 0 D C m C - vaT 0 O m m' (n o (0 Cl) CD 1 ' 0 � 0Ir 0 co CO 0 -0 Som 3• G) ).<< co vi r 3_o N 0' N . o m 0.ao o) D 0 `° o) v o °N, X O fi N r0► .moi N = O E O O m 0 O m .__ C) -� ' I- _. - - -- - n coWOW° v OW) cri . C43 CO cz W 0 COCCO V O) 0> . W N - O c0 0)' O) on A W N O CO CO V O UI A W N -+ J 3 '0 0) 'fn p - N ;* .C) 'W co b '�. 'D '�.. ;D C) C) o o '(n 0 D n b b 13 rn 'O 'O N * * * c 1- m z n c3 O 0 '0 0) cD 7• = 'a a N c O N '0 cD 7 b 'a 'c 7 0 co_‘ O X w 0 :y v .0 0 O O 'a o m o rn c m' — m .7 o m :o m m .m v Q 3 ° '' R.- x ,13 13 - < .° .° —1 -I —1 m a v 3 3 N 3 ° W r- i. 0 m '3. v ° 1) m m 'm w7 CD c ;t c io * < < o c m ',o -- ''m 'w '` '�• o 0 0 m o -0 Fij El- 'a ° 0 ° 7 ° -• 3 ° o m CO - a = o o 'm 'o c y '3 o '0 0 ',i , , F c CD < m 7 '0 '0 co 0) n '7 — N 7 7 '0 7 N ',N 0 '7 f0) '° 'C. 5 _ 'C. O 0. 0. �, �0 ,� :7 7 S O - �n O. n a � 7 1- a. 71 a 'N �a N 7 O ;c Q -, �1. � c CD— N x N 2 C io =. a �� 0 '° W CO y �* p00 7 7 �� �0 0 ,0 N :r N o ;to 0 7 c ^- 0) • 0 o ;3 w �- m m a x CD 'm 7 c°o' -9 ° A 5 v :c c o c v m 0 CD ° c ;o —I N c �0 V a 7 c° 'O 3 N D 3 a '0 O '° a 7 0 0 0 3 o �3 A) 0 a p. "0 '0 'O < 0. '0. .me 0 0O a 'Z. O . 7• O p) �c '.O -0 N �0 0 ',da C ° .-. a <. < 0. a cD N 7 a 'O :3-,5' ° O C) o m m m * 0 b �� n CD b m' v * -• N CL CD <D o F d . „,,,-0) �' m Z * 0 3. o * v w b rp w m o :�• ;� m 0_ c v o v 5 s m 0 w v a c d 0 D 3 0 �; * w s c o 6 f c 3 o z o v m 7 0 0 o Cr 0 ° 0 3 m 73 v;B. o n u w w o; 3 0 0 0 0 °) ? a ° 7 o ? o c tom y < o F "0 N o• • m 7 v v 0 c co m 0 o ° .y-. D w O o. ° 7 D 0 CD (D ! mD , UU .N III o- < :3 m Ij1 O W 9 'fD 0) 'Q 7 CD O a° 3 Q° - ',..,0' •< o) coo.07- N y b N < G1 O c O O p co ”. co �- '0. cp 9;, ur :n :sp :A o d to p_ rn �74: No y :y �N N cQ 0 7 0O :0 .a -0 N :D o 0 a 6 c w 7 T o 7 c O m .X m T ° w v �° d ° iv o w, o 0 0' ac N rn w m g W Q O o a. 0 CD o v o 7 mH z z z z z 7 7 ,7 7 7 7 7 :7 '7 7 ,7 7 7/7 7 c 7 z z z -< -< -< -< -< - - -< - -< -< z Z 6 > > > > ° 0 0 C) 0 0 0 ,C) ,0 0 0 0 0 ' 0 C) O C) D D D vo) ai N 2,, w w roo) y y n ccDn of D D 3 3 3 3 3 3 3 3 3 3 3 3�t 3 3 3 3 V V - -co -co -co V ;o V -co v V a V V V 0 x °T p O coo Wv 3 aoi o 3 'o / v ' :. CO 0. : ? o CI ID i 1 ' ' ; 0) O m o -< 3 ' : . : ' ' ' ' : : : ' : ' N c 0 3 c) co O 3 3 03 7 0 0 0 D 3 m C — w Q 0 O 0 Fnm V 0 O (0 CO Iv ❑❑ V/ell History File A '' EN11 Infor r nation of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD I'I 11/06/24 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 11/04/18 3756573 01 2.375" CTK *** LIS COMMENT RECORD *** II11111111IIIIIIIII Remark File Version 1.000 IIIIIII IIII IIIIIII Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame -well Information Block #MNEM.UNIT Data Type Information STRT.FT 9629.0000: Starting Depth STOP.FT 12597.7500: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: 02-12C FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 16' 9.557"N 148 deg 28' 56.819"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 18 Apr 2011 API . API NUMBER: 500292027703 -Parameter Information Block #MNEM.UNIT Value Description SECT. 36 Section TOWN.N T11N Township RANG. R14E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . DF Log Measured from FAPD.F 56.00 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 56.00 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to 109 this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 21 Jun 2007 above the Kick off Point of 10132 feet MD per Walter Tifental with BP Exploration (Alaska) , Inc. The MWD data is now the PDCL for well 02-12C. (8) The sidetrack was drilled from 02-12B through a milled window in a 3 1/2 inch liner. Top of window 10132 ft.MD (8750.4 ft.TVDSS) Bottom of window 10136 ft.MD (8753.7 ft.TVD55) (9) Tied to 02-12B at 10119 feet MD (8740.1 feet TVDSS) . (10) Baker Hughes INTEQ run 5 was used to set a bridge packer above SSSV. No logging data is presented. (11) Baker Hughes INTEQ run 6 was unable to reach bottom and pulled out of the hole due to potential motor chunking. No logging data acquired. (12) The interval from 12575 ft to 12598 ft MD (8977.5 ft. to 8977.3 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9637.2, 9639.2, ! 2.00293 9646.21, 9648.01, ! 1.80273 9650.62, 9652.62, ! 2.00293 9655.22, 9657.23, ! 2.00391 9659.83, 9660.63, ! 0.801758 9661.43, 9662.24, ! 0.801758 9665.04, 9665.84, ! 0.800781 9668.45, 9668.45, ! 0 9671.65, 9672.05, ! 0.400391 9673.85, 9674.66, ! 0.801758 9679.06, 9679.46, ! 0.400391 9684.47, 9685.07, ! 0.600586 9694.09, 9695.09, ! 1.00195 9708.11, 9708.71, ! 0.601562 9713.45, 9715.06, ! 1.60254 9722.87, 9723.67, ! 0.801758 9726.07, 9725.87, ! -0.200195 9729.21, 9729.21, ! 0 9732.08, 9731.68, ! -0.400391 9736.03, 9736.63, ! 0.600586 9739.23, 9739.23, ! 0 9742.04, 9742.04, ! 0 9749.65, 9749.25, ! -0.401367 9759.66, 9759.66, . 0 Page 2 tapescan.txt 9762.47, 9762.07, ! -0.400391 9772.88, 9773.08, ! 0.201172 9775.09, 9775.29, ! 0.200195 9781.7, 9781.1, ! -0.600586 9782.84, 9783.64, ! 0.801758 9785.04, 9785.44, ! 0.400391 9793.61, 9793.41, ! -0.200195 9801.02, 9800.02, ! -1.00195 9808.63, 9808.23, ! -0.401367 9825.06, 9825.26, ! 0.200195 9832.27, 9833.07, ! 0.800781 9837.68, 9840.68, ! 3.00488 9855.04, 9853.04, ! -2.00391 9858.85, 9857.04, ! -1.80273 9862.65, 9860.65, ! -2.00391 9866.06, 9864.46, ! -1.60254 9871.47, 9870.06, ! -1.40234 9874.47, 9873.67, ! -0.800781 9878.08, 9876.88, ! -1.20117 9884.04, 9883.24, ! -0.800781 9887.84, 9886.64, ! -1.20215 9889.85, 9888.85, ! -1.00195 9900.06, 9898.66, ! -1.40234 9904.47, 9902.47, ! -2.00293 9907.88, 9905.67, ! -2.20312 9916.01, 9913, ! -3.00488 9925.62, 9922.22, ! -3.40527 9932.44, 9929.43, ! -3.00488 9940.45, 9937.84, ! -2.60352 9943.05, 9940.45, ! -2.60449 9945.86, 9943.05, ! -2.80469 9946.86, 9944.05, ! -2.80469 9953.27, 9950.46, ! -2.80371 9955.87, 9953.67, ! -2.20312 9958.08, 9955.47, ! -2.60352 9961.68, 9958.08, ! -3.60645 9963.69, 9961.28, ! -2.4043 9968.49, 9965.49, ! -3.00488 9970.5, 9967.89, ! -2.60352 9972.7, 9969.9, ! -2.80469 9973.9, 9971.7, ! -2.20312 9978.04, 9976.04, ! -2.00391 9984.05, 9982.85, ! -1.20117 9993.47, 9990.26, ! -3.20508 10004.3, 10001.5, ! -2.80371 10008.1, 10005.9, ! -2.2041 10012.1, 10009.9, ! -2.20312 10018.1, 10015.3, ! -2.80469 10029.3, 10027.1, ! -2.2041 10046.5, 10043.7, ! -2.80469 10067.7, 10064.7, ! -3.00488 10070.9, 10067. 5, ! -3.40527 10079.5, 10076.9, ! -2.60449 10091.7, 10088.9, ! -2.80371 10098.9, 10096.1, ! -2.80469 10107.1, 10103.9, ! -3.20508 10112.5, 10108.9, ! -3.60547 10115.1, 10112.3, . -2.80469 10121.7, 10119, ! -2.60449 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Page 3 tapescan.txt Tape subfile: 1 158 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** 1111111111111111111 Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 21 Jun 2007 above the Kick off Point of 10132 ft MD per Walter Tifental with BP Exploration (Alaska) , Inc. The MWD data is not the PDCL for well 02-12C. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 71 Tape File Start Depth = 9629.000000 Tape File End Depth = 12595.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Page 4 tapescan.txt **** FILE TRAILER **** Tape subfile: 2 80 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** 11111III111111III ! ! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 142 Tape File Start Depth = 9627.000000 Tape File End Depth = 12597.750000 Tape File Level spacing = 0.250000 Tape File Depth Units = feet *** FILE TRAILER **** Tape Subfile: 3 151 records. . . Page 5 tapescan.txt Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 11/04/18 3756573 01 **** REEL TRAILER **** MWD 11/06/24 BHI 01 Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes U Tape Subfile 1 is type: LIS U Tape Subfile 2 is type: LIS DEPTH GR ROP 9629.0000 -999.2500 -999.2500 9629. 5000 64.7000 -999.2500 12595. 5000 0.0000 0.0000 Tape File Start Depth = 9629.000000 Tape File End Depth = 12595.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet U Tape Subfile 3 is type: LIS DEPTH GR ROP 9627.0000 -999.2500 -999.2500 9627.2500 62.9000 -999.2500 12597.7500 -999.2500 195.8000 Tape File Start Depth = 9627.000000 Tape File End Depth = 12597.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Page 6 , tapescan.txt 0 Tape subfile 4 is type: LIS Page 7