Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
211-105
STATE OF ALASKA SKA OIL AND GAS CONSERVATION COMMIS WELL OMPLETION OR RECOMPLETION REPOPAND LOG la. Well Status: Oil ❑ Gas 0 SPLUG 0 Other 0 Abandoned Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development IO•Exploratory 0 GINJ 0 WINJ 0 WAG ❑ WDSPL 0 No.of Completions: Zero • Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 9/8/2016 . 211-105 • 316-041 3. Address: 7. Date Spudded: 15. API Number: P.O.Box 196612 Anchorage,AK 99519-6612 10/7/2011 50-029-20708-01-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 10/16/2011 PBU 14-28A Surface: 2342'FNL,822'FEL,Sec.09,T1ON,R14E,UM ' 9 Ref Elevations KB 71 17. Field/Pool(s): Top of Productive Interval: 4074'FNL,1513'FWL,Sec.10,T1ON,R14E,UM GL 42.6 BF 42.34 PRUDHOE BAY,PRUDHOE OIL • Total Depth: 3859'FNL,373'FEL,Sec.09,T1ON,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: . 3670'/3669' • ADL 028312 ' 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 675678• y- 5938009 . Zone - ASP 4 ' 11974'/8891' • 77-043 TPI: x- 678057 y- 5936332 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 676166 y- 5936503 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes 0 (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) -9668'/8860' ' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 MC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD,GR,RES,GR,IND RES,DEN,NEU,GR/CCL/MCNL SCANNED FEB 2 7 201Z 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH ND HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 32' 115' 32' 115' 30" 400 sx Permafrost II 13-3/8" 72# L-8O 31' 2496' 31' 2496' 17-1/2" 1524 sx Arctic Set III,400 sx AS I 9-5/8" 47# L-80/600-95 29' 9620' 29' 8813' 12-1/4" 500 sx Class'G',300 sx AS I 7" 29# L-80 4488' 9668' 4434' 8860' 8-1/2" 725 sx Class'G',350 sx Class'G' 2-3/8" 4.4# L-80 8985' 11674' 8211' 8888' 3" 54 sx Class'G' 24. Open to production or injection? Yes 0 No ® 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2",12.6#,L-80 4021'-9335' 9207'/8420' x 3-1/2",9.3#,L-80 9243'/8454' A6....„-.D RECEIVED 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. r.- Was hydraulic fracturing used during completion? Yes 0 No IZI • OCT0 �?V 20 16 Per 20 MC 25.283(i)(2)attach electronic and printed . 61/. ..11.4._ ! information '/ ? 1 c-7,' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED __ AOGGC �' See Attached 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period e1 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate ow. Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only to/[?41 '44611RBDnns OCT 0 2016 �,� /7�,v ✓6 28 CORE DATA Conventional Core(s) Yes ❑ No ® • Sidewall Cores Yes 0 No Er If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No Elf Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 9654' 8846 separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. Sag River 9654' 8846' Kicked off from Parent Well 9668' 8860' (14-28) Shublik 9681' 8872' Sadlerochit 9760' 8947' Shublik(Invert) 10366' 8963' Sag River 10668' 8887' • Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Wellbore Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Hartley,Josephine MariaEmail: Josephine.Hartley@bp.com Printed Name: Joe La Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: IQ/0'a INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 MC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 MC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • WELL NAME: 14-28A 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 8985' Liner Top Plug 7500' 50 Bbls Class 'G' 4021' Cut & Pull 4-1/2", 12.6#, L-80 Tubing 3688' Set EZSV 3670' Set Whipstock • 14-28A Well History (Pre-Rig Sidetrack) ACTIVITYDAT ,r;"' TT-1u T,!'f97 T/I/O = 80/150/0. Temp= SI. TBG & IA FL (SL request). AL spool dropped. TBG FL @ 220' (3.3 bbls). IA FL @ 60' (3.2 bbls). 7/14/2016 SL in control of well. 08:30 SET 3-1/2"WHIDDON ON LTP @ 8,985' MD. PULLED ST#2 RK-OGLV @ 5,401' MD. PULLED ST#1 RK-LGLV#3,003' MD. SET ST#1 RK-DGLV @ 3,003' MD. SET ST#2 RK-DGLV @ 5,401' MD. LRS PERFORMED PASSING MIT-T TO 2,500psi. LRS PERFORMED PASSING MIT-IA TO 2,500psi. PULLED ST#5 RK-DGLV @ 8,959' MD. ****NOTE: ST#5 TO REMAIN EMPTY**** PULLED 3-1/2" WHIDDON C-SUB @ 8,985' MD. SET 3-1/2" LTTP IN 35 KB LTP @ 8,985' MD. ****NOTE: LTTP LEFT IN HOLE**** 7/14/2016 T/I/O = 0/6/55. Assist slickline with MIT,s ( Pre Sidetrack) MIT T**PASSED**to 2478 psi. MIT IA**PASSED**to 2627 psi. Pumped 7.6 bbls crude down tbg to reach test pressure. Test#1 15 min T lost 144 psi. 30 min T lost 52 psi. Total loss of 196 psi in 30 mins. Bled TP back to 503 psi. Pumped 4.5 bbls crude into IA to reach test pressure. Test# 1 15 min IA lost 75 psi. 30 min IA lost 29 psi. Total loss of 104 psi in 30 mins. Bled IAP back AFE sign/tags hung on well. SLB Slickline in control of well upon LRS 7/14/2016 departure ***Job Scope: Fullbore Balanced Cement Plug*** Spot equipment and R/U Halliburton cementing. PJSM with WSL and HES. Covered the Well Entry Checklist, pressure crosscheck checklist, and performed loss of containment drill. Pumped 5 BBL's of methanol, 460 BBL's of fresh water, 190 BBL's of diesel, 156 BBL's of fesh water, 50 BBL's of 15.8 ppg Class"G" cement, 48 BBL's of fesh water, and 46 BBL's of diesel. See log for details. All diesel volumes based on tanker straps, and fresh water volumes pre and post cement based on displacement tanks due to metering discrepancy. ***Job Complete*** Length of cement plug = 1,459' Top of cement plug = 7,500' MD Type of cement= Class"G" cement Weight of cement slurry= 15.8 ppg 7/18/2016 Volume of cement slurry= 50 BBL's T/I/O =VACNAC/30. Temp= SI. Bleed TBG & IA(assist cameron). AL disconnected. T& IA FL near surface. See cameron log for details. 7/20/2016 SV, WV, SSV= O. IA, OA= OTG. 15:20. T/I/O =VACNAC/30, Temp: SI, PPPOT-T(PASS) PPPOT-IC (PASS) Pre RWO PPPOT-T: Stung into test void, (2,000 psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, all moved freely. Torqued LDS to 600 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 50 psi in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. Stung into lower body test fitting, (100 psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 100 psi in 15 minutes, lost 0 psi in second 15 minute test. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, all moved freely. Torqued LDS to 500 ft/lbs. Pumped 7/20/2016 through void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 100 • • 14-28A Well History (Pre-Rig Sidetrack) ***WELL S/I ON ARRIVAL*** (pre-sidetrack) BRUSH BPV PROFILE w/5 1/2" BRAIDED LINE BRUSH RAN 2.81" GAUGE RING, 1 3/4" SAMPLE BAILER, WORK PAST 37' SLM, UNABLE TO PASS 5884' SLM( NO SAMPLE) 7/20/2016 ***CONT ON 7/21/16 WSR*** ***CONT FROM 7/20/16 WSR***(pre-sidetrack) RAN 2.0" CENT, 1 3/4" SAMPLE BAILER, TAG @ 5884' SLM, (NO SAMPLE) CEMENT IN QC RAN QC, 2.5" x 2' DD BAILER, TAG @ 5885' SLM, (small sample of cement/piece of foam ball) TAG 4-1/2"x3-1/2"XO W/3.70" GAUGE RING @ 4,378' SLM/4,401' MD. TAG 4-1/2"x3-1/2"XO W/3.65" CENT @ 4,378' SLM/4,401' MD. TAG 4-1/2"x3-1/2"XO W/3.70" CENT, 2.50" SAMPLE BAILER @ 4,378' SLM/4,401' MD.(no recovery) 7/21/2016 ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED*** T/I/O=0/0/30 Temp= S/I CMIT-txIA to 3500 psi (Failed) (Sidetrack) Pumped 9.5 bbls of 50*diesel down IA/TBG to reach test pressure. After 4 failed tests, bled T/IA psi down to 7/22/2016 1500 psi. Bled back—4 bbls. ***Continued on 07-23-16 WSR*** ***Continued from 07-22-16 WSR*** CMIT-TxIA to 3500 psi (PASSED) MIT-OA to 1200 (PASSED) Pumped 4 bbls of 50*diesel down T/IA to reach test pressure. 1st 15 min T/IA lost 59/96 psi. 2nd 15 min T/IA lost 26/44 psi for a total loss of 85/140 psi in 30 min. BLed back—4 bbls. Pumped 2.3 bbls of 50*diesel down OA to reach test pressure. 1st 15 min OA lost 55 psi. 2nd 15 min OA lost 23 psi for a total loss of 78 psi in 30 min. BLed back 2 bbls. Tags hung on casing valves and wing. AFE sign hung on well. SV WV SSV= 7/23/2016 closed. MV IA OA= open. FWHPS=200/200/0 ***JOB STARTED 25-JUL-2016. WELL SI ON ARRIVAL. PAD OP NOTIFIED*** MOVE IN RIG UP MAKE UP PCE AND STAB ON FOR PT. ***JOB CONTINUED 26-JUL-2016*** 7/25/2016 CONTINUE RIGGING UP. RIH W/3.65" POWERCUTTER. CUT TUBING AT 4021' MD, CCL TO CUT= 16.5'; CCL STOP DEPTH =4004.5' T/I/O = 0/0/0 ***WELL SI ON DEPARTURE. PAD OP NOTIFIED.*** 7/26/2016 T/I/O = ONac/40. Temp = SI. WHPs (E-line request). AL spool removed. OA FL @ surface. 7/26/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. 14:00. T/I/O = 0+Nac/40. Temp = SI. Cement C & B lines (Pre Rig). No AL. Injected 1 gallon of hydraulic oil down the control and balance lines. Mixed up 2.5 gallons of D-163 SqueezeCRETE cement. Pumped 1 cup of SqueezeCRETE cement down the balance line before locking up. Pumped 1 gallon SqueezeCRETE cement down the control line. Purged wellhead valves with hydraulic fluid. PT'ed the balance line to 4000#. FWPs = 7/28/2016 0+/vac/40. SV, WV, SSV= C. MV= O. IA, OA= OTG. 1430 hrs. T/I/O= 0/0/38 Temp= S/I CMIT TxIA**PASSED**to 3517/3531 psi. (Pre Sidetrack) Pumped 6.5 bbls diesel down IA to reach test pressure. 1st 15 min TxIA lost 95/95, 2nd 15 min TxIA lost 44/43. Total TxAI loss of 139/138 in 30 min test. Bleed TxIA back to 8/9, (6.2 bbls). DSO notified of well status and tree valve positions as follows: SV,WV,SSV=closed. MV=open. IA and OA open to gauges. 8/2/2016 **Fluid packed tags hung on IA and WV, AFE sign in place on arrival** FWHP=8/9/62 8/4/2016 T/I/O =XXXXXX. Temp= SI. PT B & C lines (Pre Rig). 14-28A Well History (Pre-Rig Sidetrack) T/I/O = SSV/50/40. Temp = SI. PT C & B lines to 4000 psi -PASSED-(Pre RWO). Pressure tested the C & B lines to 4000 psi with hydraulic oil. Bled pressure off before departure. FWPs = SSV/50/40. 8/4/2016 SV, WV, SSV= C. MV= O. IA, OA= OTG. 1230 hrs. T/I/O = SI/29/41. Installed 3" CIW Piggybacks IA Temp#54 and OA Temp#42 . Torqued 8/21/2016 and PT'd to API specs. (PASS). RDMO. ***Job Incomplete*** FWHP = SI/29/41. T/I/O= 20/0/0. Set 5' K BPV#606 @125", Performed LTT(Passed). RD upper tree, RU 8/22/2016 5" Temp#53, PT'd 5000. RDMO. FWP= BPV/0/0. ***Job Complete***. See Log for system, no well house, flow line, AL. Well has a dry hole tree & piggy back casing valves (2 gate valve rigged up). OAP increased 10 psi overnight. Unable to verify top gate valve on dry hole tree, bottom valve open. IA, OA= OTG. 22:30 8/23/2016 T/I/O = BPV/10/40. Bleed WHPs to 0 psi (pre rig). Well disconnected from system, no well house, FL or AL, dry hole tree installed. IA& OA have double casing valves installed. IA& OA FL @ surface. Bled IAP to bleed tank from 10 psi to 0 psi in -1 minute, -5 gallons. Bled OAP to bleed tank from 40 psi to 0 psi in -5 minutes, -8 gallons. Monitor WHPS for 30 minutes. During monitor WHPs unchanged. Final WHPs BPV/0/0. 8/23/2016 Unable to verify valve position on dry hole tree. IA, OA= OTG. 03:00 T/I/O = BPVNac/10. Temp= SI. WHP's. (Pre-Rig). WH, Flow line, AL Line, SSV, Flow cross, scaffolding removed. Double IA& OA casing valves installed w/integral flanges =inspection current. 8/30/2016 SV= ? (unreachable). MV= O. IA, OA= OTG. 20:35 o � North America ALASKA-BP Page 1 of 26 Operation Summary Report Common Well Name:14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:PARKER 272 Spud Date/Time:3/4/1982 12:00:00AM 'Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual©88.48usft(above Mean Sea Level) Date From-To ' Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (h r9/4/2016 03:00 - 08:00 5.00 MOB P PRE BEGIN EVENT WITH PARKER RIG 272 AT 03:00 (usft) ON 9/04/16 PREPARE RIG TO MOVE TO 14-28B -PREP RIG FLOOR TO SKID AND LOWER MAST ,-CONTINUE TO BLOW DOWN AND RIG DOWN LINES BETWEEN MODULES -SKID RIG FLOOR TO CENTER -LOWER MAST TO HEADACHE RACK -WARM UP AND INSPECT MOVING SYSTEMS 08:00 - 21:00 13.00 MOB P PRE MOVE RIG MODULES FROM TARMAC PAD TO DS14:WEST DOCK RD TO OXBOW RD. OXBOW TO SPINE.SPINE TO DS14. -DRILL MODULE BROKE THROUGH ROAD 1/8 MILE BEFORE INTERSECTION WITH FLOW STATION 3 ACCESS ROAD.DRILL MODULE WAS ABLE TO MAKE IT TO INTERSECTION. CONTINUE MOVING MUD MODULE TO DS14: MUD MODULE ON LOCATION AT 21:00 HRS 21:00 - 00:00 3.00 MOB N WAIT -1.07 PRE MOBILIZE AND LAY RIG MATS -PLACE MATS FROM FLOW STATION 3 ACCESS ROAD TO SPINE ROAD 9/5/2016 00:00 - 00:30 0.50 MOB N WAIT PRE MOBILIZE AND LAY RIG MATS -PLACE MATS FROM FLOW STATION 3 ACCESS ROAD TO SPINE ROAD 00:30 - 03:30 3.00 MOB P PRE MOVE DRILL MODULE AND UTILITY MODULE FROM OXBOW TO SPINE RD AND ON TO DS14. -DAMAGE SEVERAL MATS ON SPINE ROAD WITH DRILL MODULE -STOP UTILITY MODULE ON SPINE ROAD -200 YDS EAST OF OXBOW INTERSECTION -CONTINUE WITH DRILL MODULE TO DS14 03:30 - 05:00 1.50 MOB N WAIT r PRE MOBILIZE AND LAY RIG MATS -PULL SEVERAL DAMAGED MATS AND INSPECT ROAD BED -MOBILIZE MATS TO DOUBLE MAT AROUND WANDA LAKE TO DS14 05:00 - 07:00 2.00 MOB P PRE I SPOT DRILL MODULE OVER 14-28B -TOOL PUSH WITH ESD BUTTON AS RIG MOVED OVER WELL. -CONTINUE TO MOBILIZE MATS TO DOUBLE MAT AROUND WANDA LAKE TO DS14 -MOVE UTILITY MODULE ON TO DS-14 07:00 - 08:30 1.50 MOB P PRE SPOT UTILITY MODULE -RIG UP MUD MODULE INTERCONNECTS 08:30 - 10:00 1.50 RIGU P PRE RIG UP ELECTRICAL INTERCONNECTS FOR UTILITY AND DRILL MODULES. Printed 9/19/2016 11:30:11AM *AII depths reported in Drillers Depths* • • North America-ALASKA-BP Page 2 of 26 Operation Summary Report Common Well Name:14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:PARKER 272 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual©88.48usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 16:00 6.00 RIGD P PRE CONTINUE WITH MIRU. -HOLD PRE-JOB FOR RAISING DERRICK -RAISE DERRICK 540K OFF THE DERRICK STAND. -SLIDE HAUNCH INTO POSITION,SET WALKWAYS AND INSTALL HANDRAILS. -BRIDAL DOWN,TIE LINES IN DERRICK. -UNTIE SERVICE LOOP AND KELLY HOSE. -RIG UP FLOOR,HANG TONGS,CONNECT MUD,CEMENT AND BLEEDER LINES. -RIG UP MUD MODULE.,TAKE ON FLUID,CALIBRATE PITS. 16:00 - 17:00 1.00 RIGU P PRE RIG ACCEPT 16:00 9-5-2016 -HOLD PRE-SPUD MEETING. 17:00 - 18:00 1.00 RIGU P PRE OFFLOAD FLUID TO PITS. 18:00 - 18:30 0.50 RIGU P PRE HOLD RIG EVACUATION DRILL. -H2S DRILL. -ALL ACCOUNTED FOR IN MUSTER AREA 5 MINUTES. -HOLD MR WITH CREW. 18:30 - 19:30 1.00 RIGU P PRE CLEAN RIG. PERFORM AFTER MAINTENANCE HAZARD -HUNT. 19:30 - 21:00 1.50 BOPSUR P DECOMP TEST BPV -250 PSI LOW,3500 PSI HIGH.PASSING TEST -BLOW DOWN SURFACE LINES. 21:00 - 22:00 1.00 BOPSUR P DECOMP NIPPLE DOWN TREE -SUCK FLUID FROM TREE -CAMERON REP.BLEED OFF PRESSURE FROM VOID. 22:00 - 22:30 0.50 BOPSUR P DECOMP SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 22:30 - 00:00 1.50 BOPSUR P DECOMP FUNCTION TEST LOCK DOWNS. -MAKE UP CROSS OVER TO HANGER. -CLEAN THREADS ON HANGER AND CROSSOVER. -9 TURNS TO MAKE UP CROSSOVER. 9/6/2016 00:00 - 05:00 5.00 BOPSUR P DECOMP NIPPLE UP BOPE -MAKE UP 4"DRILLPIPE AND RACK IN DERRICK. 05:00 - 05:30 0.50 BOPSUR P DECOMP HOLD EVACUATION DRILL WITH CREW -CONDUCT PRE-SPUD MEETING 05:30 - 06:30 1.00 BOPSUR P DECOMP TEST BOPE -RIG UP 7"TEST JOINT -ATTEMPT TO SCREW CROSSOVER INTO HANGER -CROSSOVER THREADS DAMAGED -SWAP TO DONUT TEST JOINTS. 06:30 - 08:00 1.50 BOPSUR P DECOMP RIG EVACUATION DRILL AND PRE-SPUD MEETING 08:00 - 10:00 2.00 BOPSUR P DECOMP 5'IN ALL TEST JOINTS TO DRY LOCATE ALL RAMS AND ANNULAR. -RIG UP 7"TEST JOINT,FILLAND BLEED AIR FROM SYSTEM. -PERFORM BODY TEST OF BOP Printed 9/19/2016 11:30:11AM "All depths reported in Drillers Depths* • North America-ALASKA-BP Page 3 of 26 Operation Summary Report Common Well Name:14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:PARKER 272 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual©88.48usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 BOPSUR P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 7",4-1/2"AND 4"TEST JOINTS -CHART FOR 5 MINUTES -TEST ALARMS AND FLOW SHOW. -TEST WITNESS WAIVED BY CHUCK SCHIEVE -HCR KILL FAILURE 11:00 - 13:30 2.50 BOPSUR N RREP -1.07 DECOMP REPLACE HCR KILL -BLOW DOWN KILL LINE -REMOVE AND REPLACE HCR 13:30 - 18:00 4.50 BOPSUR P DECOMP TEST BOPE TO 250 PSI LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST WITH 7",4-1/2"AND 4"TEST JOINTS -CHART FOR 5 MINUTES -TEST ALARMS AND FLOW SHOW. -TEST WITNESS WAIVED BY CHUCK SCHIEVE 18:00 - 19:30 1.50 BOPSUR P DECOMP LAY DOWN TEST JOINTS -RIG UP DUTCH RISER -SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 19:30 - 20:00 0.50 WHIP P DECOMP RIG UP LUBRICATOR AND TEST TO 250 PSI LOWAND 3500 PSI HIGH.5 MIN 20:00 - 21:30 1.50 WHIP P DECOMP PULL TEST DART --DRAIN STACK -MAKE UP PULLING TOOL TOT BAR -COULD NOT LATCH INTO SLOT WITH TOOL 21:30 - 23:30 2.00 WHIP N SFAL -1.07 DECOMP PULL TEST DART -MOBILIZE MAGNET TO DRILL FLOOR AND MAKE UP TO 4"DRILLPIPE -RETRIEVE DART ON SECOND ATTEMPT. -LAY DOWN MAGNET. 23:30 - 00:00 0.50 WHIP P DECOMP MAKE UP LUBRICATOR TO DUTCH RISER -TEST BREAK WITH QUICK TEST SUB TO 3500 PSI. -PULL BPV 9/7/2016 00:00 - 03:30 3.50 WHIP P DECOMP CIRCULATE OUT FREEZE PROTECT. -CIRCULATE 300 BBLS SEAWATER WITH BARAKLEAN 03:30 - 05:30 2.00 WHIP N SFAL -1.07 DECOMP SPEAR TUBING HANGER -MAKE UP SPEAR AND ATTEMPT TO SPEAR HANGER -SEVERAL ATTEMPTS PACKOFF APPEARS TO BE HANGING UP. 05:30 - 08:30 3.00 WHIP N SFAL -1.07 DECOMP WAIT ON SPEAR -INSTALL STRIP-O-MATIC CYLINDER AND FUNCTION TEST -BUILD 24 STANDS OF 4"DRILLPIPE. 08:30 - 10:00 1.50 WHIP P -1.07 DECOMP MAKE UP NEW SPEAR -ENGAGE SPEAR AND PULL HANGER TO DRILL FLOOR. -182K TO MOVE,82K PU WT. -MOVE SLOWLY TROUGH THE BOP DUE TO TIGHT TOLERANCE. 10:00 - 12:00 2.00 WHIP P -1.07 DECOMP RIG UP TO PULL TUBING -BREAK OUT HANGER -RELEASE SPEAR AND LAY OUT -LAY DOWN HANGER. -RIG UP SPOOLING UNIT AND TONGS. CHANGE OUT ELEVATORS. Printed 9/19/2016 11:30:11AM *All depths reported in Drillers Depths* • North America-ALASKA_.Bp Page 4 of 26 Operation Summary Report Common Well Name:14-28 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:PARKER 272 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual @88.48usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ! 12:00 - 16:00 4.00 WHIP P -1.07 DECOMP PULL4-1/2"TUBING FROM CUT AT4021' 1-MONITOR WELL FOR 10 MINUTES,STATIC. -PU WT 77K,SO WT 74K @4021' -LAID DOWN 99 JOINTS 4 1/2"TUBING -1 GAS LIFT MANDREL -1 SSSV -1 CUT JOINT 3'11" -RECOVERED 66 SS BANDS. 16:00 - 18:30 2.50 WHIP P -1.07 DECOMP RIG DOWN DOYON CASING -CAMERON CHECKED LOCK DOWNS FOR CASING GROWTH. -NO INDICATION OF CASING GROWTH. 18:30 - 21:00 2.50 WHIP N WAIT -1.07 DECOMP WAIT ON E-LINE -BUILD 4"DRILLPIPE STANDS AND RACK IN DERRICK. 21:00 - 00:00 3.00 WHIP P -1.07 DECOMP RUN 8-1/2"GAUGE RING JUNK BASKET ON SLB E-LINE TO 4100'MD -HOLD PJSM WITH E-LINE CREWAND RIG TEAM -RU E-LINE WITH NO PRESSURE CONTROL, ONLY INTEGRAL LINE WIPER AND CUTTER APPROVED BY WSUP PER 100204 SECTION 5.4.1.5 -LOAD TOOLS TO RIG FLOOR AND MAKEUP TOOL STRING -RUN GAUGE RING JUNK BASKET ASSEMBLY TO 4100'MD -POOH WITH E-LINE AND LD TOOLS -RECOVERED 2 STAINLESS STEEL BANDS AND ASSORTED RUBBER 9/8/2016 00:00 - 03:00 3.00 WHIP P WEXIT RUN AND SET EZSV -PJSM WITH SLB AND RIG CREWS. -LOAD CHARGE AND EZSV -RIH AND LOG ON DEPTH -SET CENTER ELEMENT 4'ABOVE COLLAR @ 3689' -TOP OF PLUG @3687.5 03:00 - 04:00 1.00 WHIP P WEXIT TEST EZSV 1-250 PSI LOW 5 MIN. -3500 PSI HIGH 30 MIN. -LOST 17 PSI FIRST 15,6 PSI FOR SECOND 15 MIN. -WSUP APPROVAL TO PROCEED -SEE ATTACHED TEST CHART AND WELLBORE TESTING CRITERIA CALCULATOR 04:00 - 07:00 3.00 WHIP P WEXIT CHANGE OUT TUBING SPOOLAND PACK-OFF -OA MONITERED FOR 3 X ESTIMATED TIME FOR CHANGEOUT(STATIC) -PJSM FOR NIPPLE DOWN BOP'S -DRAIN BOP -REMOVE TUBING SPOOL -REPLACE PACK-OFF -BUILD 4"DRILL PIPE STANDS 07:00 - 08:00 1.00 WHIP P WEXIT INSTALL PACK OFF AND RUN IN LOCK DOWN SCREWS -ORIENTATE AND SET NEW TUBING SPOOL ON WELL HEAD -MOVE BOP BACK ON TO NEW SPOOL AND NIPPLE UP. -CONTINUE TO BUILD STANDS OFF LINE Printed 9/19/2016 11:30:11AM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 5 of 26 Operation Summary Report Common Well Name:14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 ' Rig Name/No.:PARKER 272 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual @88 48usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 1 (hr) (usft) 08:00 - 09:30 1.50 WHIP P WEXIT PRESSURE TEST -TEST 9 5/8"PACK OFF 250 PSI LOW 15 MIN,3500 PSI HIGH 15 MIN -TEST APPROVED BY WSUP 09:30 - 10:30 1.00 WHIP P WEXIT PRESSURE TEST BOPE BREAKS -250 PSI LOW/3500 PSI HIGH FOR 5 MIN 'EACH. 10:30 - 11:00 0.50 WHIP P WEXIT BLOW DOWN MUD LINES -INSTALL 815/16"WEAR RING. 11:00 - 12:00 1.00 WHIP P WEXIT MAKE UP WHIPSTOCK ASSEMBLY -CLOSE BLIND RAMS -SET WHIPSTOCK IN SLIPS -PICK UP TRI-MILLASSEMBLY AND PIN TO 'WHIPSTOCK -OPEN BLIND RAMS 1-MAKE UP FLOAT SUB AND 1 JT 5:HWDP 12:00 - 14:00 2.00 WHIP P WEXIT RIH WITH WHIPSTOCK -RIH ON ELEVATORS,EASY IN AND OUT OF SLIPS. -SHALLOW TEST MWD @ 900',GOOD TEST. 14:00 - 15:30 1.50 WHIP P WEXIT RIH WITH WHIPSTOCK FROM 900'TO 3650' -PICK UP WT 124K,SLACK OFF WT 128K ,@3560' 15:30 - 16:00 0.50 STWHIP P WEXIT I ORIENT WHIPSTOCK TO 60 DEG LEFT OF HIGHSIDE. -SET WHIPSTOCK SET DOWN 58K TO SHEAR,PU TO VERIFY. 116:00 - 17:00 1.00 STWHIP P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.6 PG MILLING FLUID. 400 @ 800 PSI. gip17:00 - 00:00 ' 7.00 ! STWHIP P WEXIT MILL 8.5"WINDOW FROM 3670'TO 3697'MD kwx !-400 GPM,905 PSI ON BOTTOM 840 PSI OFF -95 RPM,3K TORQUE ON BOTTOM,2K MP) TORQUE OFF -WOB 3-5K -PU WT 124K,SO WT 128K,ROTATING WT 1122K -MUD WT 9.6 PPG IN AND OUT. -TOW 3670',BOW 3684' 9/9/2016 00:00 - 01:00 1.00 STWHIP P WEXIT DRILL 8-1/2"INTERMEDIATE HOLE 3697'TO 3704'WITH TRI-MILL ASSEMBLY -400 GPM,908 PSI ON BOTTOM,885 PSI OFF -95 RPM,2K FT-LBS TORQUE ON BOTTOM,1K FT-LBS TORQUE OFF -WOB 7-8K LBS -PU WT 123K,SO WT 122K,ROTATING WT 122K -MUD WT 9.6 PPG IN AND OUT 101:00 - 01:30 0.50 STWHIP P WEXIT CIRCULATE 1-1/2 TIMES BOTTOMS UP -400 GPM,1050 PSI -95 RPM,1-2 K FT-LBS TORQUE -PUMP 35 BBL HI-VIS SWEEP SURFACE TO SURFACE,MINIMAL INCREASE IN CUTTINGS -UNANNOUNCED KICK WHILE DRILLING DRILL ,AFTER FIRST BOTTOMS UP -WELL SHUT IN 4 MIN FROM START OF SIMULATED INFLUX -HOLD AAR WHILE CIRCULATING Printed 9/19/2016 11:30:11AM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 6 of 26 Operation Summary Report Common Well Name:14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/4/2016 End Date: X3-017TH-C:(5,639,281.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:PARKER 272 Spud Date/me:3/4/1982 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292070800 Active datum:14-28 Actual @88.48usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 STWHIP P WEXIT POOH ON ELEVATORS FROM 3704'TO 854' -MONITOR WELL FOR 10 MINUTES ON BOTTOM,STATIC -MUD WT IN AND OUT 9.6 PPG -PU WT 122K,SO WT 120K AT 3660' 03:00 - 04:00 1.00 STWHIP P WEXIT 'LAY DOWN BHA -MONITOR WELL FOR 10 MINUTES,STATIC -HOLD PREJOB SAFETY MEETING -RACK BACK 5 STANDS 5"HWDP -RACK IN DERRICK 3 STANDS NMDC -LAY DOWN MWD,1 JT HWDP,AND FLOAT SUB -GAUGE AND LAY DOWN TRI MILL ASSEMBLY -LOWER MILL 3/8"UNDER,MIDDLE MILL 3/8", UNDER UPPER MILL 3/16"UNDER 1-MILL GAUGE WITHIN SLB SPECIFICATIONS 04:00 - 05:30 1.50 DRILL P INTI CLEAN AND CLEAR RIG FLOOR -WASH BOPE.WORK VALVES AND RAMS TO CLEAN MILLING DEBRIS 05:30 - 08:00 2.50 DRILL P INTI MAKE UP 8-1/2"DRILLING ASSEMBLY -PJSM WITH BAKER DD/MWD AND DRILL CREW -MAKE UP 8-1/2"BIT -RE-SHIM MUD MOTOR SCRIBE TOOLS -PICK UP FLEX COLLARS,JARS AND HWDP 08:00 - 09:30 1.50 DRILL P INTI RIH WITH DRILLING BHA FROM 921'TO 3704' -FILL PIPE EVERY 2000' -SHALLOW HOLE TEST TOOLS AT 1867' -ORIENT MOTOR TO 60°LEFT OF HIGHSIDE PRIOR TOP EXIT WINDOW 09:30 - 18:00 8.50 DRILL P INTI I DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 3707'TO 4118' -411'IN 8.5 HRS=48.3 FPH WITH CONNECTIONS AND SURVEYS -INSTANTANEOUS ROP=40-150 FPH 1-500 GPM,1340 PSI ON,1160 PSI OFF 1-65 RPM,2K FT-LBS TORQUE ON AND 2K FT-LBS TORQUE OFF BOTTOM -WOB 17K LBS -PU WT 124K,SO WT 121K,ROTATING WT 117K -NO BACKREAMING AT CONNECTIONS -SURVEY EVERY 30'DUE TO DOGLEGS >5°/100 -MUD WT IN AND OUT 9.6 PPG 18:00 - 18:30 0.50 DRILL P INTI 1SERVICE TOPDRIVE AND RIG FLOOR EQUIPMENT 18:30 - 00:00 5.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 4118' I TO 4520' -402'IN 5.5 HRS=73.1 FPH WITH CONNECTIONS AND SURVEYS -INSTANTANEOUS ROP=60-150 FPH -500 GPM,1340 PSI ON,1160 PSI OFF -65 RPM,2K FT-LBS TORQUE ON AND 2K FT-LBS TORQUE OFF BOTTOM -WOB 17K LBS -PU WT 124K,SO WT 121K,ROTATING WT 117K -NO BACKREAMING AT CONNECTIONS 1-SURVEY EVERY 90' -- --_ - -MUD WT IN AND OUT 9.6 PPG Printed 9/19/2016 11:30:11AM *AII depths reported in Drillers Depths* TREE= GRAY CT • Sky NOTES: WELL ANGLE>70* WEL = GRAY OR= AXELSON' 4�2$A WBS 14-28 NOT SHOW BELOW WHIP@STOCK""ORIG KB.ELEV=_ ^71' Rff IiEV_= 71' BE ELEV= — 42.34' I 3670' H9-5/8"WHPSTOCK(09/08/16) KOP= - 3800' ` 3688' H9-5/8"EZSV(09/08/16) Max Angle= 112"@ 1009T' Datum ND=_ 9680 20"CONDUCTOR, H 110' 4021' --IJET CUT TBG(07/26/16) m = DatuTVD - _8800'SS 94#,H-40, 4401' -14-1/2"X 3-1/2"XO,D=2.992" ID=19.124" GAS LFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D=12.347" H 2494• ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DMY RK 0 07/14/16 2 5401 5186 36 TGPDX DMY RK 0 07/14/16 4-1/2"TBG,12.6#,L-80,.0152 bpf,ID=3.958" -I 4401' 3 6754 6285 35 TGPDX DMY RKR 0 09/09/96 9-5/8"X 7"LIP w/LNR HGR -I 4486' 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 "5 8959 8187 21 TGPDX - 07/14/16 &TRACK SLV,D=6.25" 1111 `6 9080 8300 21 TGPDX DMY RK 0 09/09/96 CEMENT PLUG(07/18/16) --7500'-8959• •*GLM#5 Behind CMT PLUG :+:v1'goWe. 9-5/8"CSG,47#,L-80 BTC XO TO SOO-95 BTC -I 8604' ').1#1•••••111 'GLM#6 Be hind CTD LNR&Inaccessible �� 0. ��► 8985'_I-{3-1/2"LTTP(07/14/16) Minimum ID = 1.78 8989 44: ►4 �j 8985' H35 BKR KB LTP,D=1.875"(10/25/11) SELBRT PLUG BUSHING ;�; 8989• H2.70"DEPLOYMENTSLV,D=1.780"• ►i • 3-1/2"TOP OF CEMENT -I 8989' ••� 9201' -17"X 4-1/2"BKR S-3 PKR,D=3.875" BEHIND *•• CT LNR •j�• 9226' 3-1/2"HES XN NIP,MLLED TO 2.80"(09(11111) • 3-1/2"TBG,9.3#,L-80,.0087 bpf,D=2.992" - 9238' ��� 9238' H 3-1/2"LOC SEAL ASSY W/O SEALS ei c ,, : 9241' 7"X3-1/2"BKR FB-1 FKRASSY,D=4.00" •• 1 ..• 9255' -15'MLLOUT EXTENSION,ID=4.50" 7"SCAB LNR,29#,L-80 AB MDD-BTC, --I 9314' 04• • 9260' -I5-1/2"X 3-1/2"XO,D=2.992" 0371 bpf,D=6.184" �n oN TOP OF 7"LNR - 9314' ..41). 9314' -19-5/8"X 7'BKR LTP&TRACK SLV,D=? 3-1/2"TBG-PC,9.3#,L 80,.0087 bpf,ID=2.992" 9333' 9323' -13-1/2"OTIS XN NP,MLLED TO 2.80"(09/11/11) 9-5/8"CSG,47#,SOO-95 BTC,D=8.681" -I 9618' 1 �� 9332' -13-1/2"BKR SHEAROUT SIB BB BEHIND PERFORATION SUMMARY 44.1 ••• 9333' -3-1/2"WLEG,D=2.992" CT LNR REF LOG:BEN MWD ON 10/17/2011 1111� 1111 ANGLE AT TOP PERF:87°@ 11201' :111 1 111111 9328' I-I an D TT LOGGED 06/30/90 1 Note:Refer to Production DB for historical perf data *111*1111 SIZE SFF WTERVAL Opn/Sqz SHOT SQZ •111*4 1111 1-14/25" 6 11201-11250 S 10/23/11 10/21/15 11111 1111 1-14/25" 6 11410-11600 C 10/23/11 11111 1111 *1111 1111 *1111 1111 X1111 11� MLLOUT WINDOW(14-28A) 9668'-9673' #111# ## 7"WHPSTOCK SET @ 9667'(10/05/11) 441 1At ^11160' 1-ITOPOFCMT(CRETE)(10/21/15) 7"LNR,29#,L-80 BTC,.0371 bpf,D=6.184" - -9667• 11170' _-I2-3/8"1NFD CMT RETAUVER(10/21/15) 11380' -12-3/8"WFD CEP(12/08/12) PBTD H 11649' 2-3/8"LNR,4.4#,L-80 STL,.0039 bpf,D=1.995" -1 11674' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/24!82 PKR 191 ORIGINAL COMPLETION 07/19/16 MGS/JMD SET LTTP(07/14/16) WELL: 14-28A 01/08/90 NORDIC 1 RWO 07/19/16 TBD/JMD GLV C/O(07/14/16) PERMIT No:2111050 09/09/96 D-16 IINO 08/01/16 BWJMD JET CUT TBG(07/26/16) API No: 50-029-20708-01 10/26/11 NORDIC2 CTD 08/08/16 MS/MD SET CMT RUG(07/18/16) SEC 9,T1 ON,R14E,2341'FNL&822'FEL 12/07/15 JMfvYJMD GLV GO(10/25/15) 02/04/16 /TLH EST CMT DEPTH(10/21/15) BP Exploration(Alaska) tiOFTy • • €w'\'\\I%%i s� THE STATE Alaska Oil and Gas �� 1 �1, ofA li A S KA Conservation Commission tit-i== 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OFALASY'P' Fax: 907.276.7542 www.aogcc.alaska.gov Mary Endacott SCANNED VEP $ �q ` 4 Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-28A Permit to Drill Number: 211-105 Sundry Number: 316-041 Dear Ms. Endacott: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, j.-1-1 Cathy P. Foerster Chair cot_ DATED this day of January, 2016. RBDMS Lt. JAN 2 5 2016 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMM • APPLICATION FOR SUNDRY APPRO S 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate 0 Other Stimulate 0 Pull Tabing 0 Change Approved Program ❑ Plug for Redrill p - Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing ❑ Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 211-105 • 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development p- 6. API Number 50-029-20708-01-00 • 99519-6612 Stratigraphic ❑ Service ❑ 7. If perforating: 8. Well Name and Nu b What Regulation or Conservation Order governs well spacing in this pool? ElC El V E Dy Will planned perforations require a spacing exception? Yes No lI PBU 14-28A �{': 9. Property Designation(Lease Number): 10. Field/Pools: JAN02d 2016 ADL 028312 • PRUDHOE BAY,PRUDHOE OIL - /S i !!6 11. PRESENT WELL CONDITION SUMMARY C, Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): /Junk(MD): 11974 • 8891 11170 8883 2452 11170, 11380 None Casing Length Size MD TVD Burst Collapse Structural Conductor 83 20" 32-115 32-115 1490 470 Surface 2465 13-3/8" 31 -2496 31-2496 4930 2670 Intermediate 9591 9-5/8„ 29-9620 29-8813 6870/8150 4760/5080 Liner 5180 7" 4488-9668 4434-8860 8160 7020 Liner 2689 2-3/8 8985-11674 8211-8888 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11410-11600 8890-8884 5-1/2",17#x 4-1/2",12.6#x 3-1/2°,9.3# L-80 9335 Packers and SSSV Type: 4-1/2"Baker S-3 Packer Packers and SSSV MD(ft)and TVD(ft): 9207/8420 3-1/2"Baker FB-1 Packer 9243/8454 12.Attachments: Proposal Summary RI Wellbore Schematic p 13.Well Class after proposed work: Detailed Operations Program LI BOP Sketch RI Exploratory ❑ Stratigraphic 0 Development RI Service ❑ 14.Estimated Date for Commencing Operations: February 1,2016 . 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended RI 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned ❑ 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Smith,James be deviated from without prior written approval. Email James.Smith7@bp.com Printed Name Mary Endacott Title Engineering Team Leader Signature �� 7 �� �� Phone +1 907 564 4388 Date I/ 11 //�1 K/ COMMISSION USE ONLY I Conditions of approval:Notify Commission so that a representative may witness Sundry Number: ,\U — affil\ Plug Integrity ❑ BOP Test 12' Mechanical Integrity Test ❑ Location Clearance 0 Other: 6 1,4_2c 1. {- t- 5 {-o3 5 G C p I L(,A,1/2 5P r` 1,4_25- Z 4 S 2- p 5/5 ) fjy-,vi !c.r yr ✓ffc✓" t7-5,_1" Z y�SCci 1IZ[ ) t!<tcry)�f J6�9gl61Ctr�+- appy-o✓'e p C Z 5• Post Initial Injection MIT Req d. Y s No Spacing Exception Required? Yes❑ No ISubsequent Form Required: /0 —4 0 F-- APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: (22_// k7-4- //Z/ //4' y� ORIGINAL RBDMS LL JAN 2 5 2016 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate i /, z/./6 • • 0.40 GP6 ateritzt, , hatidy. 14-28A Sundry Application Well Type: Producer Current Status: The well is currently shut-in. Request: Approval is requested for the P&A of Prudhoe Bay well 14-28A to sidetrack and complete 14-28B. MIT-T Passed to 2000 psi (5/23/2014) MIT-IA Passed to 2000 psi (3/20/2015) MIT-OA Passed to 1200 psi (11/15/2015) PPPOT-T Failed to 5000 psi (11/19/2015) PPPOT-IC Passed to 3500 psi (11/19/2015) Well History: 14-28A was a coil sidetrack drilled and completed in 2011. The well has suffered from low " productivity and high water cut since it was brought online. Intervention operations have been unsuccessful to increase production, so the well has been on long term shut-in. 14-28A has no remaining value as all rational actions to remediate performance have been exhausted. Scope of Work: The sidetrack plan for the 14-28A well includes the following operations. The horizontal lateral has been P&A'd with a 2-3/8" cement retainer set at 11,170', followed by a cement squeeze using 30 bbls of 14 ppg SqueezeCrete cement. Pre-rig, the dummy GLM will be pulled at 8959' MD. A cement plug will be circulated into the tubing and IA, which will bring the top of cement to —7,500' MD. Once the cement has setup, the final top of cement will be determined with a drift run followed by an integrity test of the tubing and inner annulus. Next, the 4-1/2"tubing will be jet cut at—4,000'. The rig will then move over the well and pull the 4-1/2" tubing. A clean out run will then be performed, followed by the setting of an EZSV bridge plug in preparation of the whipstock exit at—3,700' MD. The 7" intermediate casing will be set at the top of the Sag River formation and the 6-1/8" production hole will be drilled in Zone 4 of the Ivishak reservoir. The production liner will be a cemented and perforated. 4-1/2"tubing will then be run to the top of the production liner. MASP: 2,452 psi Estimated Start Date: Feb 01, 2016 14-28A Sundry 1 RBDMS ,�iaii L J this 1/15/2016 • • Pre-Rig Prep Work: Step Service Line Description of Work 1. S Pull DGLV from station 5 at 8959' MD 2. F CMIT-IA to 2500 psi 3. F Circulate Lateral Cement Plug into Tubing and IA. -50 bbls of 15.8 Class G. TOC -7500' (length -1500' MP) 4. S D&T Cement. Drift for Jet Cut 5. F CMIT-TxIA to 3500 psi, MIT-OA to 1200 psi 6. E Jet Cut Tubing at 4000'. Planned KOP is-3700' MD. 7. D Bleed T/I/O to 0 psi 8. 0 Cement Control Lines 9. 0 PT Control Lines 10. W PPPOT-T to 5000 psi, PPPOT-IC to 3500 psi. Function LDS. 11. V Install Dry Hole Tree. Install Annulus Valves. Set TWC. Proposed Drilling Rig Operations: 1. MIRU Parker 273. 2. Test TWC from above and below to 3,500 psi for 5 minutes each. " 3. Nipple down tree. Nipple up BOPE and test to 3 500_psi. (Configured from top to bottom: annular preventor, 7"fixed rams, blind/shear, mud cross, 2-7/8 "x 5-1/2"VBR) 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection and displace well to clean seawater. 6. Pull 5-1/2"x 4-1/2"tubing from the pre-rig cut. 7. Perform 9-5/8" cleanout run to tubing stub. 8. R/U E-line. RIH w/GR/CCL and 9-5/8"EZSV for 47#casing. Set the EZSV at-3716' MD (competent sand/confirm with GR)as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 9. Pressure test the EZSV to 3500 psi for 30 min and chart. 10. Nipple down BOPE and old tubing spool. Change out 9-5/8" packoff and nipple up new tubing spool and BOPE. Test packoff and breaks. 11. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 12. Displace the well to 9.5 ppg LSND based milling fluid prior to 9-5/8" casing milling operations and other path-forward 8-1/2"drilling operations. 13. Mill a window in the 9-5/8" casing at-3700' MD'. 14. POOH for drilling BHA. 15. MU an 8-1/2" Rotary Steerable drilling BHA with DIR/GR/RES/PWD/GR-at-bit. RIH 16. Drill 8-1/2" intermediate interval to weight up point above HRZ 17. Continue drilling to 7"casing point at the top of the Sag River. NOTE: Plan to weight-up the mud with spike fluid to a 10.8 ppg over 2 circulations per procedure, prior to drilling into the HRZ. 18. Circulate well clean, short trip to bring bit to GR TD, run back to TD, circulate wellbore clean. POOH for 7"drilling liner. 19. Run a 7", 26#, L-80, Vam-Top HC drilling liner back into the 9-5/8" casing with minimum of 150' liner lap. Cement 7" liner with 15.8 ppg class G cement. Displace cement with mud. 20. Set hanger and liner top packer. Release f/liner&circulate BU, POOH, L/D liner running tool. 14-28A Sundry 2 1/13/2016 • • 21. After cement has reached a minimum 500 psi compressive strength, test the 9-%" casing X 7" liner to 3,500psi for 30 minutes and record the test. 22. Change out 7" rams to VBR's and test to 250 psi/3,500 psi. 23. MU a 6-1/8" RSS BHA with DIR/GR/RES/DEN/NEU with a PDC bit and RIH to the 7" landing collar. 24. Displace well to the planned 8.5 ppg DIF and monitor well for 30 minutes as a negative test on the liner lap. 25. Drill out the 7" shoe plus 20' of formation. Pull into the shoe and perform an FIT. 26. Drill the 6-%" production build and lateral as per directional plan. Circulate well clean, short trip as needed, and POOH. 27. Run 4-1/2", 12.6# 13Cr VamTop liner to TD. 28. Cement liner to TOL with 15.8 ppg Class G cement. 29. Set liner top packer and hanger. 30. Displace wellbore to clean seawater and circulate excess cement above TOL. 31. POOH and LD liner running tool. 32. Pressure test liner/packer/casing to 3,500 psi for 30 minutes. 33. RU DPC perf guns, RIH, and perforate liner. 34. RU and run 4-1/2", 12.6# 13Cr VamTop completion per the tally. Tag up in PBR, space out, and land tubing hanger. RILDS. 35. Displace tubing and IA to clean seawater. 36. Reverse circulate in heated seawater and inhibited seawater to IA and tubing (surface to surface). 37. Drop ball &rod and set production packer. Individually test tubing and IA to 3,500 psi for 30 minutes each. 38. Shear DCK valve. 39. Reverse circulate in diesel freeze protect down IA using rig's injection pump. 40. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 41. Install TWC and test from above to 250 psi low/3,500 psi high for 5 minutes each and below to 250 psi low/3,500 psi high for 5 minutes each. 42. N/D BOPE. NU adapter flange and double master valves. Test to 5,000 psi with diesel. 43. Ensure Heet is left on top of TWC and only diesel is left in the tree. 44. Install all annulus valves and secure the well. 45. RDMO Post-Rig Operations 1. Change out dry hole tree for production tree. 2. DSM to pull TWC. 3. MI/RU slick line. Pull TWC, ball and rod, and RHC plug. Pull shear valve and dummy GLVs. Install GLVs. 4. Flowback, per ASRC. 5. Modify S-riser as required. 6. Install flow lines and well house. Drilling Engineer: Jimmy Smith (907) 564-5616 Production Engineer: Travis Alatalo (907) 564-5351 Geologist: Casey Denny (907) 564-5901 14-28A Sundry 3 1/13/2016 I F& = GRAY WELLHEAD= GRAY SJOY NOTES: WELL ANGLE>70°0 9930'"'ORM T 14 28A ACTUATOR= AXELSON � WBS 14-28 NOT SHOWN BELOW WHIPSTOCK"' KB.ELEV= 71' BF ELEV= 5-12"TBG, 17#, — 23' 23' -5-1/2"X 4-1/2'XO,D=4.892' KOP= 3800' L-80,.0232 bpi, Max Angle= 117 n 10097' D=4 B92• • 2186' H4-1/2'CAM BAL-O SV LN NP,D= 3.813" Datum MD= 9680' - [ tum TVD- 8800'SS 20"OONDUGTOFZ 110' 1 94#, 0' 4401' —4-1/2'X 3-12'XO,D=2.997 D=19.124' GAS LITM MJPELS 13-3/8'CSG,72#,L-80 BUTT,D=12.34r H 2494' ST MD l ND DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DOME RK 16 10/25/15 4-1/2'TBG,12.6#,L-80,.0152 bpf,D=3.958" -- 4401' 2 5401 5186 36 TGPDX SO RK 20 10/25/15 3 6754 6285 35 TGP8( DMY RK 0 09/09/96 9-5/8"X r LTP w/LAIR HGR — 4486' 4 7709 7077 32 TGPCD( DMY RK 0 05/18/11 &TEBACK SLV,D=6.25' 58959 8187 21 TGFD)( DMY FE 0 09/09/96 6 '9080 8300 21 TGFOX DMY RK 0 09/09/96 il 1.1 'GLM#6 Behind CTD LNR&inaccessible 19-5/8"CSG 47#,L-80 BTC XO TO S00-95 BTC — 8604' �._-- 8985' —35 BKR KB LIP,D=1.875"(1025111) Minimum ID = 1.78" a@ 8989' 4 I •SELBRT PLUG BUSHING ,• � �11 : 8989' --12.70"(�LOYMENTSLV,D=1.780' 3-1/2'TOP OF CEMENT 8989' .41 t 9201' —7"X 4-1/7 BKR S-3 = BBNND H ►4�1 � : PF(R I) 3,875" ;•;CA' LN. CT LNR ►:• • 0�. / • 9226' —3-12'HES XN NP,MILLED TO 2.80"(09/11/11) 3-1/7 TBG,9.3#,L-80,.0087 bpf,D=2.997 — 9238' •moi ,,/ . � 9238' J--3-1/7 LOC SEAL ASSY WO SEALS • I t•• ►..�4I 1 1►j 9241' —7'X 3-12'BKR FB-1 FKRASSY,D=4.00" •-• •I • �• 9255' 5'ALLOUT EXTENSION,D=4.50' r SCAB L 29#,L-80 AB MOBTC, -1 9314' ►•i NL/11, Q 1 i 8260' —I5-112"X 3-1/7 XO,D=2.992" .0371 bpf,D=6.184' 4• 4 4 ' Q TOP OF r LNR 9314' ►• 1 4," 9314' —9-58"X r BKR LTP 8 TEBACK SLV,D=? 1 � 3-1/7 TBG-PC,9.3#,L-80,.0087 bpf,I)=2.997 — 9333' ' 9323' --13-1/2"OTS XN NP,MLLED TO 2.80"(09/11/11) 9-5/8"CSG,470,SOO-95 BTC,ID=8.681" 9618' i ______---1 9332' }--3-1/2'BKR SFEAROIIT SUB BB#ND I.PERFORATION SUMMARY •41r�0 .. 9333' —3-1/2"WLET.3,I)=2,997 CT LNR REP LOG:BD ON 10/17/2011 01114 1111 H MW 1111 1111 9328' --J ELMD IT LOGGED 06/30/90 Fes:ANGLE AT TOP F :87°0 11201' *1114 1111 Note:Feer to Production DB for historical perf data /1/1� 111 SIZE SPF MT31VAL Opn/Sqz SHOT SQZ •111• 111 1-14/25' 6 11201-11250 S 10/23/11 10/21/15 *111* 1111 1-1425• 6 11410-11600 C 1023/11 '1/1I 111 X1114 111 4111 1111 MLLOUT WIDOW(14-28A) 9668'-9673' X1114 1111 HPSTOCK SET @ 9667'(10/05/11) 11111 11 r W 1 • 11170' -{2-38"WFDCMT BETAWER(1021/15) 7"LNR 29#,L-80 BTC,.0371 bpf,D=6.184' J— --9667' 11380' -12-38"WFD CI3P(12/08112) 2-3/8'SLB SQZCPETECMT(1021/15) — ? 0 PBTD — 11649' 2-3/8'LNR,4.40,L-80 STL,.0039 bpf,D=1.995" —1 11674' 1' DATE REV BY EX)AABJTS DATE REV BY C OMITS FRWHOE BAY (1'IIT 03/24/82 PKR 191 ORIGINAL COMPLETION 05/28/14 LECJJMD GLV C/O(05/23/14) WB_L: 14-28A 01/08/90 NORDIC 1 RWO 12/07/15 BLS/JMD SET CMT RET/RAN CMT(1021/1! PERA.l No:`1111050 09/09196 D-16 RWO 12/07/15,JM,I'JM) GLV C/O(1025/15) AR No: 50-029-20708-01 10/26/11 NORCIC2 CTD SEC 9,T1ON,R14E,2341'FTC&822'FEL 12/22/11 MPIJMD CCLGDRAFT COFI ECTIOPS 12/13/12 RMH/JMD SET WFD CEP(12/08/12) _ BP Exploration(Alaska) TREE= GRAY WELLHEAD= GRAY Si-2 8 B Pre-Rig Y NOTES: WELL ANGLE>70*W6i 14-28 NOT SHOWN BLOW WHIP@STOCK`"*ORIG ACTUATOR= AXELS_ON KB,ELEV= 71' BF.BH EV= 5-112"TBG, 17#, 23' t L ' KOP= 3800' L-80,.0232 bpf, Max Angle= 112°@ 10097' D=4.892" O 2185' 4-1/2"CAM BAL-O SVLN NP,D= 3.813" Iil L ----------- --------------- Datum M3= 9680' Datum TVD= 8800'SS 20"CONDUCTOR, —I 110' 9 94#,H-40, ,(;(,,, H TUBING JET CUT ID=19.124" / ` // GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D=12-347" --I 2494' ST ND iV D DEV TYPE V LV LATCH PORT DATE 1 3003 3003 0 TGPD DOME RK i6 10/25/15 4-1/2"TBG,12.6#,L-80,-0152 bpf,D=3-958" H 4401' 2 5401 5186 36 TGPDX SO RK 20 10/25/15 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 9-5/8"X 7"LW w/LNR HGR —i 4486' 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 &TIEBACK SLV,ID=6.25" 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 6 *9080 8300 21 TGPDX DMY RK 0 09/09/96 TOP OF CEMENT PLUG --i 7500' •• *GLM#6 Behind CTD LNR&Inaccessible • • • •4 8985' —I 35 BKR KB LTP,ID=1.875"(10/25/11) 9-5/8"CSG,47#,L-80 BTC XO TO S00-95 BTC —I $604' • ••4 • •4 3-1/2"TOP OF CEMENT — 8989' • • 9201' ---I 7"X 4-1/2"BKR S-3 A R,D=3.875" :,� ,op,,41,0 • ••• 9226' -13-112"HES XN NP,MLLEDTO2.80"(09/11/11) •• �4 3-1/2"TBG,9.3#,L-80,.0087 bpf,ID=2.992" — 9238' 4 9238' H3-1/2"3-1/2"LOC SEAL ASSY W/O SEALS • , 4;44 ♦•44, • `' • NV' ',4. _ 9241' —17"X 3-1/2"BKR FB-1 PKR ASSY,D=4-00" • • Minimum ID = 1.78" @ 8989' • �4 SELBRT PLUG BUSHING • • �� • •4 7"SCAB LNR,29#,L-80 AB MOD-BTC, —I 9314' ip + ;i 0371 bpf,ID=6.184" _ + 9314' —I9-5/8"X 7"BKR LTP&TIEBACK SLV,D=? I 3-1/2"TBG-PC,9.3#,L-80,.0087 bpf,ID=2.992" —I 9333' I\ ' 9-5/8"CSG,47#,SOO-95 BTC,D=8.681" --I 9618' I PERFORATION SUMMARY 11i1• 9333' (—3-1/2"WLEG,D=2.992" • REF LOG:BHI MWD ON 10/17/2011 11 11 ANGLE AT TOP PERF:87°@ 11201' 11 1• 11 , Note:Refer to Production DB for historical perf data 1 111 SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 111 111 1-14/25" 6 11201-11250 S 10/23/11 10/21/15 111 111 11 11 1-14/25" 6 11410-11600 C 10/23/11 ,1 111 1111 111 MLLOUT WINDOW(14-28A) 9668'-9673' 1114 11( 111 111( 7"WHPSTOCK SET @ 9667'(10/05/11) ♦♦ 11170' —12-3/8"WFD CMT RETAINER(10/21/15) 7"LNR,29#,L-80 BTC,.0371 bpf,D=6-184" —9667' 1 '' 2-3/8"SLB SOZCRETE CMT(10/21/15) -I 11380' —I2 3/8"WFD CSP(12/08/12) 0 PBTD 11649' 4. 2-3/8"LNR,4.4#,L-80 STL,.0039 bpf,D=1.995" H 11674' 1' DATE REV BY COMMENTS . DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/24/82 PKR 191 ORIGINAL COMPLETION 05/28/14 LEC/JMD GLV C/O(05/23/14) WELL: 14-28A 01/08/90 NORDIC 1 RWO 12/07/15 BLS/JMD SET CMT RET/RAN CMT(10/21/1: PERAK No:' 111050 09/09/96 D-16 RWO 12/07/15 JMM/JMD GLV GO(10/25/15) API Nb: 50-029-20708-01 10/26/11 NORDIC2 CTD 1'1/07/16 GJS PRE-RIG EDfTS SEC 9,T1ON,R14E,2341'FNL&822'FEL 12/22/11 MP/JMD DRLG DRAFT CORRECTIONS 12/13/12 RMI-VJMD SET WED CIBP(12/08/12) BP Exploration(Alaska) • • • • PARKER 273 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP i 13 5/8"-5M FLANGED BOTTOM .,-,,,,,,, r..,-. W/(2) 14" UL2 OPERATOR, UPPER CAVITY 0 0 ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, Fii ifiiFfi Fit SHAFFER LXT 13 5/8"-5M LOWER CAVITY 13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 I I ' DRILLING CROSS: I I 13 5/8"-5M FLANGED TOP iir I p, " ,,po 3 13 5/8"-5M FLANGED BOTTOM »n °°°°e° °�0«� _ I W (2) 3 1/8"-5M SIDE OUTLETS - E II ° $ °Flo- JL ,I _mss.,... °°,,-;•3 °'° II 1 °°°° '' II T KILL LINE: r .,�I�17AI\1 : :-' 2-1/16" 5M FLEX HOSE ��l �i /•� •�� �� 1: .► 2-1/16" 5M X 3-1/8" 5M D.S.A. '`��`I� ��I�A bo 3-1/8" 5M FLANGED MANUAL GATE VALVE (J� 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE E •Iik Amu on ° ° • 3 0° I 1 I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 8" 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1 / w/(2) 14" UL2 OPERATOR • • Loepp, Victoria T (DOA) From: Smith,James <James.Smith7@bp.com> Sent: Thursday,January 21, 2016 1:30 PM To: Loepp,Victoria T (DOA) Cc: Lastufka,Joseph N Subject: RE: PBU 14-28A(PTD 211-105, Sundry 316-041) Plug for Redrill Attachments: 14-28B Pre Rig.pdf Victoria, Attached is the requested schematic. I apologize for accidentally leaving this out. Thanks, Jimmy Jimmy Smith Drilling Engineer—IPA Rotary BPXA James.smith7Ca)bp.com Office: (907) 564-5616 Work Cell: (907) 887-9347 Personal: (770) 503-5886 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp(aalaska.gov) Sent: Thursday, January 21, 2016 10:49 AM To: Smith, James Subject: PBU 14-28A(PTD 211-105, Sundry 316-041) Plug for Redrill James, Please provide a post-plug well bore schematic. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp aC.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov 1 - • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or • / "Suspend"boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist A work)the initial reviewer will cross out that erroneous entry and initial thea/)' / it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the"Plug Stat Tech for Redrill" box,they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code,they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMfv )N REPORT OF SUNDRY WELL OPERATIONS _ 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program / Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: M96 Cr LI 5 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 211-105 3. Address: P.O.Box 196612 Anchorage, Development D Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20708-01-00 7. Property Designation(Lease Number): ADL 0028312 8. Well Name and Number: PBU 14-28A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED 11.Present Well Condition Summary: Total Depth: measured 11974 feet Plugs measured 11380 feet JUL 15 2015 true vertical 8891 feet Junk measured feet Effective Depth: measured 11380 feet Packer measured See Attachment feet HA OG C V true vertical 8891 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor Surface See Attachment Intermediate Production Liner SCOW JUL 2 8 2015 Perforation Depth: Measured depth: 11201 -11250 feet 11410-11600 feet True vertical depth: 8884-8887 feet 8890-8884 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 12 0 4037 2019 252 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signatur )-2644_4.41. - Phone +1 907 564 4424 Date Willies.-- ��.._, si-7 r l r,c--' Packers and SSV's Attachment PBU 14-28A SW Name Type MD TVD Depscription 14-28A PACKER 4503.17 4447.06 7" Top Packer 14-28A PACKER 9207.02 8419.79 4-1/2" Baker S-3 Perm Packer 14-28A PACKER 9241.42 8452.19 3-1/2" Baker FB-1 Packer a) Q o 0 0 0 0 0 0 0 0 0 0 o I,- CO (0 N N CO O CD LLo LM LM CO ON- O O N LO LO 0 1-0 I� � U) N- N- O U y CD 0 0 0 CD CD CD 0 0 0 0 0 i 0) M L() I- (0 (0 .4- CO C") M (fl co O x NI- 0 0 0 CO CO CO CO CO N- 00 CO r r LO CO N O CO V CO CO 0) O7 v CO N CO CO (NI CO Ln CO V CO 00 Ln CO N M V d' L() N CO I- CO CO CO CO CO CO H N CO CO d N (fl 07 CO N CO CO N CO Lf) CO CO CO N LC) N V N V CO d- r-- V CO CO CO V CO Q� CO O (O CO CO — N- N- Ln O) N O CO CO - O 'Cr O M V' CO CO CO C) N N N N M N O) CO O) 0) O) - O) O) O) V 0 4.0 C Q ++ Q CO CO CO LO N N o O) CO ‘- CO O CO r- O `V CO CO CO N V 0) N 0) N 0) d 0) Nr CO� r Q co U) O O) O O O O O co O O O co 00 00 00 00 C) = J p J 00 OOJ JJJ *k N (n # J J *k * COCO CO . N LO N- *k V *k *k N N O C) CO V N N N _ N N N V ol? a\olnl� l� � � � � � � NLn 6 Lf) 7 7 O) 4. d. CO M M -' t V 0) 00 N C M00 CO C I) N co CO O) N a) N Lo co 00 M CD co co C O J W W M O W o 0 N U U LU LU (j p c a. a Z Z Z Z Z Z Z W W W W m m m 0:1 m m O D H H Z Z D D D D D D 0 &) ZZJJHHHHHH 0 7r .7 7C o O e _U5 co k \ o § � � � IEEE o 2 0 -.(-/) � :\ ct 0_ \ 0 o o E/ \ / e 2 0 � •° -a G 0 g o n . R r \t E E Q / \ - - eeCL k / k * 0 »90 0 / 0 0 ƒ 0 2 Z a & = e.g 2 § _ 'm > § i oE ° e o § 0® ao .- = 5 = CL- o > - waw _ o \ o = U) \ taƒ 0 - \ $ c. \ m c Cl) . o 0\ \ % \ / / n % » o > '/ % n 2 = / ' 0 CO <CU / � \ / / \ Co%\ \ � 0 \ / CL / r = = e7 R OQ / 0 / / - \ / / \ ) / \_ f 2 3 > 7 a R = ± = LL 4 \ S \ / § \ O —o_ o @ _ 0 0 = g 2 0 = _ = 5 oM g ._ % 5 -0 Zrrw > \ / uU &f /ED / 0 0 / 2 \ % % 7 f / 0 \\ o - 2 E § t ® 9 o _0 ° x .0_ 0- § 2 / \ � \ © / u) g6 C en © 6 o = m ± ' i : E - Cti CI \ / uj k c) \ \ c:2 \ _Q \ E 0 I E 5 = e o # « 0 ± ci0 ci 6 -�w / \ _ m - .Ec \& 2saR = EEc7) = / I o - ' 7 ® e e s 9 n ,- 0 \ \ 7 i2 G a E \ \ \ / _1 _1 0 o = = a - n „ U O -3 e -. cn § > \ ƒ_--„L' -r'-` / \ $ ) /u)11 E k C> e A -o ƒ -E-5 \ Z ƒ / L 0 e r \ \ \ / 7 2 » a / 5 = _ I r • m I- 0 » \ 4 Tl _• GRAY ACT AAD= GRAY 14_2 8M WBS 14-28 0TES: WELL ANGLE>70°NOT SHOWN BELOW WHIPSTOCK*** KB. ACTUATTORR= AXELSON KB.ELEV= 71' BF.ELEV= 5-1/2"TBG, 17#, — 23' l L I j 23' H5-1/7 X 4-1/2"XO,D=4.892" KOP= 380(Y L-80, .0232 bpf, _ 2185' —{4-112"CAM BAL-O SV LN NP,D= 3.813" Max Angle= 112'@ 10097' D=4.892" ® Datum M3= 9680' Datum"ND= 8800'SS 20"CONDUCTOR H 110' A , 94#'H-40' / 4401' —14-1/2"X 3-1/2"XO,D=2.992" ID=19.124" GAS LFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D=12.347" —1 2494' ST MD ND DEV TY FE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DMY RK 0 05/23/14 1 4-1/2"TBG, 12.6#,L-80,-0152 bpf,ID=3.958" —{ 4401' 2 5401 5186 36 TGFDX DMY RK 0 05/23/14 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 9-5/8"X 7"LTP w/LNR HGR — 4486' 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 &TE3ACK SLV,D=6.25' 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 6 '9080 8300 21 TGPDX DMY RK 0 09/09/96 n `4 • 'GLM#6 Behind CTD LNR&Inaccessible 9-5/8"CSG,47#,L-80 BTC XO TO$OO-95 BTC — 8604' ..A. o• •• Minimum ID = 1.78" 8989' • 8985' BKR KB LEP,D=1.875"(10/25/11) SELBRT PLUG BUSHING • • 4 8989' —{2 70'DEPLOYMENT SLV,D=1.760" 3-1/2"TOP OF CEMENTH 8989' •; �! 9201' 7"X 4-1/2"BKR S-3 FKR,D=3.875" BIND •jC C«: CT LNR •• • •• • 9226' H3-1/2"HES XN NP,MLLED TO 2.80'(09/11/11) •• 3-1/2"TBG,9.3#,L-80,.0087 Dpi,D=2.992" 9238' ♦� a ., .i 9238' H3-112-LOC SEAL ASSY W/O SEALS :4 C. ,� • 9241' --{7"X 3-1/2"BKR FB-1 FKR ASSY,D=4.00" �j 1 00 9255' --15'MLLOUT EXTENSION,D 0" =4.5 • T SCAB LNR 29#,L-80 AB MDD-BTC, --1 9314' �� :.•\ 9260' H5-yr X 3 1/2"XO,D=2.99? .0371 bpf,D=6.184" o� i TOP OF 7"LNR —I 9314' 4 T 9314' H9-5/8"X 7"BKR LTP&TRACK SLV,D=? I '- 3-1/2"TBG PC,9.3#,L-80,.0087 bpf,13=2.992" 9333' ' 9323' _--13-1/2"OTIS XN NP,MILLED TO 2.80"(09/11/11) 9-5/8"CSG,47#,S0O-95 BTC,ID=8.681" —1 9618' 4 9332' H3-1/2"BKR SHEAROUT SUB BBRND CT LNR PERFORATION SAARY NI *IV* 9333' H3-1/2"WLEG,D=2.99? 11M REF LOG:BH MOON 10/17/2011 *111 1111 ANGLE AT TOP FERE:87'@ 11201' :111 1111 9328' —I ELM)TT LOGGED 06/30/90 Note:Refer to Production DB for historicalperf data '111 1111 , 0111 1111 SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 11 11 1-14/25" 6 11201 -11250 0 10/23/11 *111 1111 1-14/25" 6 11410-11600 C 10/23/11 1111 1111 .111 :1:1 04*1111 1111 X1111 11* 7"WHPSTOCK SET @ 9667'(10/05/11) *A*, 1�1� FALLOUTWR‘DOW(14-SA) 9668'-9673' 7"LNR,29#,L-80 BTC,.0371 bpf,D=6.184" — --966T 1 11380' _--{2-3/8'AFD CEIP(12/08/12) PBTD H 11649' ' 2-3/8"LNR,4.4#,L-80 SEL,.0039 bpf,D=1.995" —1 11674' 1' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY LINT 03/24/82 PKR 191 ORIGINAL COMPLETION 05/28/14 LEC/JM) GLV CIO(05/23/14) WELL: 14-28A 01108/90 NORDIC 1 RWO PERMIT No:1t111050 09/09/96 D-16 RWO AR No: 50-029-20708-01 10/26/11 NOR101C2 CTD SEC 9,T1ON,R14E,2341'FNL&822'FEL 12/22/11 M/JM 3 DR...G DRAFT CORRECTIONS 12/13/12 RM-YJWD SET WFD CEP(12/08/12) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. .,2_1 f - 1 Q 5 Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RESC N: OVERSIZED: NOTES: Col r Items: ❑ Maps: rayscale Items: Logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: (/5/JL1i. /s/ ii4P Project Proofing BY: Asg00 Date: I /s/ n4P Scanning Preparation a x 30 = 1,00 + )a =TOTAL PAGES 7cL (Count does not include cover sheet) BY: Date: 5- /4 /s/ Production Scanning Stage 1 Page Count from Scanned File: 73 (Count does include cove sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: � Date: /4 /s/ mp Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o t o .m c J m O o- o CO p1 o N m T.. m -o •a w a, m cc rn I.."00 I-_j W H I--2 c m c o =•? E 2 o� O y0y 0 1 Ow I O 0 c f6 a) J m �' •N= a3 U N'J N-LL w JI O 4 'O N. T 5U �N V U a) N m N (n1 tL cold cu z_`-I N 031 L_ N 1 �I y Z (a9 oQo p `° aao oC�J oQoC� LU ce� pZ ITS�LLIH W Li oI to w E O 0 N«Ce Nd;�'N N �. 1 1 1 U a)p(n U Iz m ca oap> ° o v��i E � p �LL� �v>�i 2 m-ia .o0� z = o V 2cDp om aa)) mom CO ° m a(0i m~a 4000l2 4cooiI- �ccoolOCO °-ccoolM1 d I cO El 2JU 2 da0 dMccw O.cO a .-N 1 TN 1= W ENU 1 W N 1E I TO47. O OCS CJ N N N N N N N N N O (O (D (O (D n (o (o (o (o (o S C C C C C C m ) OU Oa O Occ O O O J Ce a w ma o o rn r-- a) r-- a) r-- a) rn r- OZ m M (o CO (o (o (o (o (o rn Was N O c r co co co co o co co co a Niro o o) o) rn rn rn o U.1 w J j U a m Z c J IZ' Z J a co \ 11 to I c," o , zl " -U � � U o o � e , ;io O N 0- CN) i .Ce co 1�a li U) in E SII a U 0 0 N N t0 N LO / % O J (0 V ti U N co w J a z H CO Q` N I..' II W H H H 0 — j NII; GW co• N 1 R WI Iii .-W Ce a m , 11 0 Q c 21 II ce_ I w w 35 >5w CI IS• O O H a y N N N •N E J "O 'p N N co N f/) Z 7 O O Q' a)1. (6 (a _c. ILII m 'I m m C C C C Cco co a) w C C .O O O O •O 0 0 E m a� 76 m E E > > > > > • 'u cco o I II ce Z a) a) -10 c c c c rn rn w 0 U a p co 0 Z 0 y a) rn rn co co co co co co co N O J w y a co co N. NN.- n N- r` r- N. N O !1 Q I Z t C N (a 7 N N N N N N N N N 5 O W O Z N ' 2 O O :, Q H 1_, (7 E To w p rn I p cO u °fo a 0. a a pW 1 (` °' 2 U U U U U Uce I z W O 5 y J E p C7 Fa- a y 0)a a o p o o 0 0 0 0 0 0. IIS cc a IT 3 J01-',J W J J W W W W W co on p 0 pm Co p m 7-a co I t I- _j _1H� CO o 1 = HH 0o UmU 1Uw Uw Uw 5 U ZQ � ZQ z o O I Op OLi OLL OL-E n c). •\ c z aT- m y- ,-W r-� I N� I d' , I aTi aTi oiQv >- >- N I•- ILL IQ IQ IQ 2 2.0 c 2` N � O) 0 N U) 1 N(n I N o Z a)u Z N(n Z 7 7 y 0 0 y a) O E5 u-d' Q WwQ Wa' LL WIY LL y WccLL E+= ,N L >. c) I 2 I C II c) I I 0 II m m N 'E - (a E - E c (/) c X(/) • c c(/) O o .-°)..c E ") m c E01LLIa> EU1LLI -010 rn o010 ca 00 o 11Y °o o H o < o uQp E �Qp UQ� u �Q� v �Q�a m v N 0. o Z WNMIE WN10 WN I= WN II WN II p p a) xO U a (a a a F.D. 2 co M C) M M O O (a U U _1 J N 0 N 0 N Z ' (D (D CO (0 (0 a5 ,` Z ,� Q I E } k,...?..)- >- I J co, ( w? 1 0 O N ` p , Z .) O O N a) m as CL Nm O U ° r- m E p p W g n Z vi ai ce O cg a� m w o o LE a LE E W N O m of E E Z :? (n Q a0+ 1 re O y u) L N li --� n. C) I O. f6 j o 7 it ....1 O U U a) I G▪ M o Cl) O a) 1 1 O V a E 0 J � U c1 �J Q '''.1 O o. I— w Z o N w C� N R N c G >' N Z `\ r p o m a .5 a) E CO m o c ,� h o f- E LU '( , .� w O a) e r o 0 , co ,I` ••o ami o D QCL O m d - - Cuc o n o f A � yiI� ° E 0 Q O E U U T z O ,_ ` a) a) i. N E U > > I0 0 0 co �o as as m N u) a) c75 To 0 0 0 0 0 0 0 Ti .� v vQ C a° p p p p p p p (+a r}\ !:>} E D � c O p n co co corN 0 w _ O ca N N CNI N N N C W E Cl). 0 N SII a) W .0 w C O W O N E E z a a) m E m H Y co O a) N Z I- as in OU 0 0 0 0 a . o _ 0 C p . daU U a 7 o E `m 0 0 0 0 0 0 a 0 a) OLL o 2 aa)) o a 2 w w w w w CC w 3 ? 0 a 0 v 0 9 1- 9 co 0 0 Z (11 e) 0 o 5 c in C �I z aC; a J U O z Yq .d+ y m m H g u) o IX a O Z O. ° Iw/ o Li. X W w Upap O z 8 Q HI a) N a) 7 J a as 13. O � "' 0 1 O N a U ; 00 J co Q N 0 C� ? m G a N m CO 0 CO o '° Q = o IXg I- a N %I Q c a Z m• V Z WA ` m rn 0 CO c > CO v 3 c m N > 4• • v pr ON- 0) c..i C 2 .- to 0- E E 0 0 a) 2 1 U _ - 1 F `9 i !Fr '7\.1) BAKER PRINT DISTRIBUTION LIST o o 2013 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME \ ,-2_..S A% RUN NUMBER 2/�� --}�5G� (mandatory) LZ l 1 V FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL CD �� (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Or NHIN 15 #OF COPIES #OF COPIES ' ' 4 U 1 BP Exploration(Alaska)Inc. I 3 r 1 I • Petroterhnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 1 ConocePhillips Alaska Inc. ( .1 I 1 I I ItAttn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 l ExxonMobil,Alaska 1 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4'State of Alaska-AOGCC J 1 I 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas ( I 1 1 I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 RECEIVED STATE OF ALASKA 1. ,KA OIL AND GAS CONSERVATION COMI\. ,ION JAN 1' 2013 • REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ ' 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development0 Exploratory El e 211-105-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20708-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028312 PBU 14-28A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 11974 feet Plugs measured 11380 feet true vertical 8890.52 feet Junk measured None feet Effective Depth measured 11380 feet Packer measured See Attachment feet true vertical 8890.59 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 30-110 30-110 1490 470 Surface 2465 13-3/8"72#L-80 29-2494 29-2493.94 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11201-11250 feet 11410-11600 feet True Vertical depth 8884.36-8886.78 feet 8889.68-8884.17 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 35 1293 3983 1881 253 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: ' Copies of Logs and Surveys Run Explorator{J Development 0 Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil 0 Gas H WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s• b..com Printed Name Nita Summerha Title Petrotechnical Data Technician .4.,_ - Jr Si nat = i— i Phone 564-4035 Date 1/15/2013 RBDMS JAN 2 8 NB at / rt- r- /3 Form 10-404 Revised 10/2012 2 /1 / 3 Submit Original Only TREE= GRAY — WELLHEAD= GRAY 1 4-2 8 A WBS 14-28 NOTTESSHOWN BaOW'WELL WHIP�STOCK"'ORIG ACTUA ACTUATOR= AXELSON KB.ELEV= 71' BF.ELEV= 5-1/2"TBG,17#, H 23' I L J—F, 23' -I5-1/2"X 4-1/2"XO,D=4.892" KOP= 3800' L-80,.0232 bpf, Max Angle= 12•Q 10097' D=4.892' 1 �, 2185' H4-1/2"CAM BAL-O SV LN NP,D= 3.813' Datum MD= 9680' 1 1 Datum TVD= 8800'SS 20"CONDUCTOR H 110' , 94#,H-40, / 4401' H4-1/2"X 3-1/2"XO,D=2.992" ID=19.124" GAS LFT MANDRELS 13-3/8'CSG,72#,L-80 BUTT,D=12.347" --I 2494' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DOME RK 16 11/04/11 2 5401 5186 36 TGPDX SO RK 20 11/04/11 4 1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958' —{ 4401' 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 9-5/8"X 7'LWw/LNR HGR —{ 4486' 4 7709 7077 32 TGPDX ()MY RK 0 05/18/11 I 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 &TRACK SLV,ID=6.25" 6 '9080 8300 21 TGPDX DMY RK 0 09/09/96 • "GLM#6 Behind CTD LNR&Inaccessible 9-5/8"CSG,47#,L-80 BTC XO TO SOO-95 BTC H 8604' :• • • • Minimum ID = 1.78" @ 8989' ; Packers and SSV's Attachment ADL0028312 SW Name Type MD TVD Depscription 14-28A PACKER 4486 4361.4 7" Top Packer 14-28A PACKER 8986 8141.19 35 Baker KB Packer 14-28A PACKER 9201 8343.12 4-1/2" Baker S-3 Perm Packer a) a 0 0 0 0 0 0 0 m O, N N M CO N- O L0 O O N- O CD LO C U 17; 0000000m 1- 0) CD CD N- Cn M M 7 V' N- = CO = 0) V' c) m - O CO M CO V CO CD M M CO V N O C0 V' LU N O N- O) - O V O) ,- M CO CO - Lo CO CO CO M V CO CO N- CO N V CO 011111111 H O M N CO U) N- O N p CO Oj M M N N LU N N t!) in CO CO N V CD = N-. 0 ,- 030M tiOW03OM - M Cfl (.fl (fl V' V' N O) O) CO C) N V' O) V C•112 . 11 1 1 1 1 1 I I • M CO 0000 - ocoaN- o C O M N N N O O C �- J Q LU 0 O 9 o m O ooDO00 ' i 00 CO J O - J N J J *k — N co m •N N N N (� U � � NNvCO _ - N Ch N CA Ln M CO CA +-' CO O CD V- L V N- C CO O LU O d- M CO O - M (0 N v v O 00 UJ M D » V< O0 MOc a OOLLLZZ U Z Z OO O O O r , E \ \ - 2 / d \ / @ 0 a) o (J) D / , « = 2 + c .@ .g o c m ° o ✓ / \ § D o_ au) v) 2 » o ,-I _ _o + : o 9 5 s 3 % / § \ C 0) n 0 w W § ƒ 5 \ E % / % \ / % 7 5 ƒ k 5 g / \ -\ - § k A 5 .k n = .g c / • p 2 \ $ \ \ 4- E < \ / / 4- \ § % CO I_ f R \ .2 _ " _% as2 0 9 ) G % 6E- \ � / 2 $ 5 » $ = @ 2 ° a 5 ,» _ \ E u) _f , / v- ® ) m e Cl) 0_/ I \ \ < k / § \ ( \ 0 ct \ / \ % a) : \ / / 1 / \ xL � / / I . _c \ O © c 0 � T3 = arE 2 C CIL \ _ \ _� / \ \ / $ d % Z N \ 0 \ / / \ / I E a. .+ 0 . = C I $ E -7 ] 2 / 14- 2 _ \ $ . E Q § CO t 0 \ / \ 6 . o I - o o "g 0 0 o « 2 .§ 2 -- - - i - m - 2 2 - a) /� f\ o \� aaƒ 7 � F.- -.(7i \ 2 5 = m z = 5 m \ U- >. 2 _ , / E\ a \ o \ 2 . 22 .-c ± O a 0 e / = co o �0 o- 20) �/ \ / 0 - E t / f .g = p 7 g / ƒ \ ® L II 0 \ 7 y c \ 7 = } g < ® � § o n - H I � m : / \ 7/ \ 7e _, gI_ a7 • a . - 2 c a o CO a % o - y w o % .n ® .W11 ( 0) ® @er a 3 k Q = 5 ,- D 5 _I 9 = r = S E % E 7 H 0 ƒ o 0 ƒ 0 O o \ \ ƒ f ©0 ? H 7 0 cn — — G I A a A 7 7\ e 9 e @ » 9 N m & 2 m STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ® Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class: 20AAC 25.105 2OAAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 10/26/2011 211-105 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 10/7/2011 50-029-20708-01-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 10/16/2011 PBU 14-28A 2342'FNL, 822'FEL, SEC.09,T1ON, R14E, UM 8. KB(ft above MSL): 71' 15.Field/Pool(s): Top of Productive Horizon: 4150'FNL,4472'FEL, SEC. 10,T1ON, R14E, UM GL(ft above MSL): 42.6' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 3859' FNL, 373'FEL, SEC.09,T1ON, R14E, UM 11649' 8886' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 675678 y- 5938009 Zone- ASP4 11974! 8891' ADL 028312 TPI: x- 677353 y- 5936239 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 676166 y- 5936503 Zone- ASP4 None 18.Directional Survey: ® Yes ❑No - 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR, IND RES, DENS, NEU, GR/CCL/MCNL 9668' 8860' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 78' Surface 78' 30" 400 sx Permafrost II 13-3/8" 72# L-80 Surface 2494' Surface 2494' 17-1/2" 1524 sx Arcticset III.400 sx AS I 9-5/8" 47# L-80/soo-95,Surface 9618' Surface 8811' 12-1/4" 500 sx Class'G'.300 sx AS I 7" 29# L-80 4486' 9314' 4432' 8521' Scab Liner 725 sx Class'G' 7" 29# L-80 9314' 9668' 8521' 8860' 8-1/2" 350 sx Class'G' 2-3/8" 4.4# L-80 8985' 11674' 8211' 8888' 3" 54 sx Clasg'G' - 24. Open to production or injection? ® Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 1.56"Gun Diameter,6 spf 5-1/2", 17#x 4-1/2", 12.6# 3001' 9201'/8414' MD TVD MD TVD x 3-1/2",9.3#L-80 3001'-9333' 9241'/8452' 11201'-11250' 8884'-8887' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11410'-11600' 8890'-8884' , DEPTH INTERVAL(MD)I AMOUNT AND KIND OF MATERIAL USED A 1 0) s - I 2500' Freeze Protected w/40 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): November 6,2011 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 11/10/2011 12 Test Period 4 132 1,256 1,997 80° 9,557 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 266 1,300 24-Hour Rate ♦ 263 2,512 3,994 21.3° 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes IN No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None CIvE ' RBDMS NOV 2 8 2011 Alaska Oil&Gas Cons.Commission Form 10-407 Revised 12/2009 CONTINUED UE ON REVERSE bmit Original Only/" , Anchorw o t7 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Shublik 9681' 8872' None Sadlerochit 9760' 8947' Sadlerochit(invert) 10366' 8963' Shublik(invert)/Base of Sag River 10668' 8887' Formation at Total Depth(Name): Sag River(from base) 10668' 8887' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32. I hereby certify that the foregoing i true and correct to the best of my knowledge. Signed: Terrie Hubble Matt, Title:�I�� Title: Drilling Technologist Date: /9,42( 1) PBU 14-28A 211-105 Prepared By NamelNumber Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Zach Sayers,564-5790 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only ISM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 14 14-28 - Slot 28 500292070800 14-28A Design: 14-28A Survey Report - Geographic 18 October, 2011 • Mill BAKER bpC) HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-28-Slot 28 Project: Prudhoe Bay TVD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Site: PB DS 14 MD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Well: 14-28 North Reference: True Wellbore: 14-28A Survey Calculation Method: Minimum Curvature Design: 14-28A Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 14,TR-10-14 Site Position: Northing: 5,939,577.43ft Latitude: 70°14'26.346 N From: Map Easting: 674,150.48ft Longitude: 148°35'36.726 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.32 ° Well 14-28 API No 500292070800 Well Position +N/-S 0.00 ft Northing: 5,938,009.28 ft Latitude: 70°14'10.578 N +E/-W 0.00 ft Easting: 675,677.84 ft Longitude: 148°34'53.399 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 42.00 ft Wellbore 14-28A API No 502902070801 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (0) (nT) BGGM2011 9/28/2011 21.39 80.97 57,662 1_. Design 14-28A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,650 00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 29.00 0.00 0.00 163.39 E Survey Program Date: 10/18/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,650.00 Gyro(14-28) GYD-CT-CMS Gyrodata cont.casing m/s 9,668.00 11,974.00 MWD(14-28A) MWD MWD-Standard 10/18/2011 9:13:12AM Page 2 COMPASS 2003.16 Build 73 BAKER HUGHES Survey Report-Geographic bp INTEQ h Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-28-Slot 28 Project: Prudhoe Bay TVD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Site: PB DS 14 MD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Well: 14-28 North Reference: True Wellbore: 14-28A Survey Calculation Method: Minimum Curvature Design: 14-28A Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +E/-W Northing Easting Ir (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude I 9,650.00 14.71 155.95 8,842.19 -1,731.69 2,338.13 5,936,332.64 678,055.52 70°13'53.543 N 148°33'45.462 W TIP 9,668.00 14.71 155.70 8,859.60 -1,735.86 2,340.00 5,936,328.52 678,057.49 70°13'53.502 N 148°33'45.407 W KOP 9,700.32 16.32 180.58 8,890.77 -1,744.15 2,341.64 5,936,320.27 678,059.32 70°13'53.420 N 148°33'45.360 W 9,729.93 19.20 196.51 8,918.98 -1,752.99 2,340.22 5,936,311.40 678,058.10 70°13'53.333 N 148°33'45.401 W 9,764.05 25.15 208.34 8,950.58 -1,764.77 2,335.17 5,936,299.51 678,053.34 70°13'53.218 N 148°33'45.548 W 9,792.59 31.51 214.97 8,975.70 -1,776.23 2,328.01 5,936,287.89 678,046.44 70°13'53.105 N 148°33'45.756 W 9,823.62 38.10 220.21 9,001.17 -1,790.20 2,317.17 5,936,273.66 678,035.93 70°13'52.968 N 148°33'46.071 W 9,854.67 45.47 219.34 9,024.30 -1,806.10 2,303.95 5,936,257.46 678,023.09 70°13'52.811 N 148°33'46.455 W 9,885.55 55.34 219.16 9,043.96 -1,824.51 2,288.91 5,936,238.72 678,008.49 70°13'52.630 N 148°33'46.892 W 9,916.01 65.41 224.55 9,059.01 -1,844.15 2,271.23 5,936,218.67 677,991.27 70°13'52.437 N 148°33'47.406 W 9,945.07 74.38 227.51 9,068.99 -1,863.06 2,251.60 5,936,199.30 677,972.08 70°13'52.251 N 148°33'47.977 W 9,975.85 82.59 229.18 9,075.13 -1,883.08 2,229.08 5,936,178.76 677,950.04 70°13'52.054 N 148°33'48.631 W 10,005.83 90.74 229.51 9,076.87 -1,902.57 2,206.40 5,936,158.76 677,927.81 70°13'51.863 N 148°33'49.291 W 10,036.74 100.12 230.86 9,073.95 -1,922.25 2,182.79 5,936,138.53 677,904.67 70°13'51.669 N 148°33'49.977 W 10,067.60 109.99 233.56 9,065.94 -1,940.50 2,159.28 5,936,119.74 677,881.60 70°13'51.490 N 148°33'50.660 W 10,097.16 111.85 245.05 9,055.36 -1,954.58 2,135.60 5,936,105.12 677,858.25 70°13'51.351 N 148°33'51.348 W I 10,128.97 112.78 253.50 9,043.26 -1,964.99 2,108.11 5,936,094.07 677,831.01 70°13'51.249 N 148°33'52.147 W 10,158.73 112.79 259.70 9,031.73 -1,971.34 2,081.43 5,936,087.10 677,804.50 70°13'51.187 N 148°33'52.922 W 10,189.59 111.63 266.28 9,020.05 -1,974.82 2,053.10 5,936,082.96 677,776.25 70°13'51.153 N 148°33'53.745 W 10,220.64 110.50 272.39 9,008.88 -1,975.15 2,024.14 5,936,081.96 677,747.31 70°13'51.149 N 148°33'54.587 W 10,251.23 109.23 278.78 8,998.48 -1,972.34 1,995.53 5,936,084.09 677,718.64 70°13'51.177 N 148°33'55.418 W , 10,281.21 108.81 284.06 8,988.70 -1,966.73 1,967.76 5,936,089.05 677,690.75 70°13'51.232 N 148°33'56.225 W 10,313.96 108.87 290.08 8,978.11 -1,957.64 1,938.15 5,936,097.45 677,660.94 70°13'51.322 N 148°33'57.085 W 10,345.14 107.03 295.34 8,968.50 -1,946.19 1,910.80 5,936,108.27 677,633.33 70°13'51.435 N 148°33'57.880 W 10,375.08 105.78 299.75 8,960.04 -1,932.91 1,885.34 5,936,120.95 677,607.57 70°13'51.565 N 148°33'58.619 W 10,405.26 106.18 303.87 8,951.73 -1,917.62 1,860.69 5,936,135.66 677,582.58 70°13'51.716 N 148°33'59.335 W 10,435.45 106.83 305.94 8,943.15 -1,901.06 1,836.95 5,936,151.66 677,558.46 70°13'51.879 N 148°34'0.025 W 10,470.05 107.66 302.18 8,932.89 -1,882.55 1,809.59 5,936,169.52 677,530.67 70°13'52.061 N 148°34'0.820 W 10,505.63 105.50 300.02 8,922.74 -1,864.94 1,780.39 5,936,186.45 677,501.07 70°13'52.234 N 148°34'1.668 W 10,540.78 102.93 296.64 8,914.10 -1,848.78 1,750.40 5,936,201.90 677,470.72 70°13'52.393 N 148°34'2.539 W 10,573.80 102.94 291.79 8,906.71 -1,835.59 1,721.06 5,936,214.41 677,441.08 70°13'52.523 N 148°34'3.392 W 10,609.95 103.00 287.44 8,898.59 -1,823.76 1,687.88 5,936,225.46 677,407.64 70°13'52.639 N 148°34'4.356 W 10,651.87 101.06 284.81 8,889.85 -1,812.38 1,648.50 5,936,235.92 677,368.01 70°13'52.751 N 148°34'5.500 W 10,683.37 98.32 282.66 8,884.55 -1,805.01 1,618.34 5,936,242.58 677,337.69 70°13'52.824 N 148°34'6.376 W 10,713.68 96.71 280.26 8,880.59 -1,799.04 1,588.90 5,936,247.86 677,308.11 70°13'52.882 N 148°34'7.232 W 10,743.92 95.07 277.72 8,877.48 -1,794.35 1,559.19 5,936,251.87 677,278.30 70°13'52.929 N 148°34'8.095 W 10,773.78 92.79 275.71 8,875.44 -1,790.86 1,529.61 5,936,254.66 677,248.65 70°13'52.963 N 148°34'8.954 W 10,803.80 90.46 274.04 8,874.58 -1,788.31 1,499.71 5,936,256.51 677,218.70 70°13'52.988 N 148°34'9.823 W 10,833.79 92.06 270.88 8,873.92 -1,787.03 1,469.76 5,936,257.10 677,188.73 70°13'53.001 N 148°34'10.693 W 10,863.43 91.38 268.38 8,873.03 -1,787.22 1,440.14 5,936,256.22 677,159.13 70°13'52.999 N 148°34'11.554 W 10,892.49 92.61 266.04 8,872.02 -1,788.63 1,411.13 5,936,254.13 677,130.16 70°13'52.985 N 148°34'12.397 W 10,923.04 88.93 265.04 8,871.61 -1,791.01 1,380.68 5,936,251.05 677,099.78 70°13'52.962 N 148°34'13.282 W 10,952.80 87.42 263.10 8,872.56 -1,794.08 1,351.10 5,936,247.29 677,070.28 70°13'52.932 N 148°34'14.141 W 10,983.08 87.54 259.65 8,873.89 -1,798.61 1,321.20 5,936,242.05 677,040.49 70°13'52.887 N 148°34'15.010 W 11,013.05 87.67 257.31 8,875.14 -1,804.59 1,291.86 5,936,235.39 677,011.30 70°13'52.828 N 148°34'15.863 W 11 11,050.01 87.36 253.55 8,876.75 -1,813.88 1,256.13 5,936,225.28 676,975.80 70°13'52.737 N 148°34'16.901 W 11 11,072.97 87.24 251.55 8,877.83 -1,820.76 1,234.25 5,936,217.89 676,954.09 70°13'52.670 N 148°34'17.536 W 11,102.95 87.79 249.60 8,879.13 -1,830.72 1,206.00 5,936,207.28 676,926.08 70°13'52.572 N 148°34'18.357 W 11,132.86 86.50 252.66 8,880.62 -1,840.38 1,177.74 5,936,196.96 676,898.05 70°13'52.477 N 148°34'19.178 W 11,162.68 86.56 256.56 8,882.43 -1,848.28 1,149.05 5,936,188.40 676,869.55 70°13'52.399 N 148°34'20.012 W 11,192.70 87.48 260.11 8,883.99 -1,854.34 1,119.69 5,936,181.66 676,840.35 70°13'52.339 N 148°34'20.865 W 11,222.75 86.75 263.56 8,885.50 -1,858.60 1,089.99 5,936,176.70 676,810.76 70°13'52.298 N 148°34'21.728 W 11,252.73 87.94 267.01 8,886.89 -1,861.06 1,060.15 5,936,173.55 676,780.98 70°13'52.273 N 148°34'22.595 W 10/182011 9:13:12AM Page 3 COMPASS 2003.16 Build 73 0 b BAKER HUGHES Survey Report-Geographic INTEQ FCompany: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-28-Slot 28 Project: Prudhoe Bay TVD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Site: PB DS 14 MD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Well: 14-28 North Reference: True Wellbore: 14-28A Survey Calculation Method: Minimum Curvature Design: 14-28A Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,282.71 88.96 272.73 8,887.70 -1,861.13 1,030.19 5,936,172.78 676,751.04 70°13'52.273 N 148°34'23.466 W 11,312.98 87.42 276.58 8,888.66 -1,858.67 1,000.04 5,936,174.53 676,720.84 70°13'52.297 N 148°34'24.342 W 11,342.77 88.16 279.88 8,889.81 -1,854.41 970.59 5,936,178.11 676,691.30 70°13'52.339 N 148°34'25.198 W 11,372.83 89.08 282.75 8,890.53 -1,848.52 941.12 5,936,183.31 676,661.71 70°13'52.397 N 148°34'26.054 W 11,403.11 92.85 285.38 8,890.02 -1,841.16 911.76 5,936,189.98 676,632.18 70°13'52.469 N 148°34'26.907 W 11,443.16 92.58 292.82 8,888.12 -1,828.08 873.99 5,936,202.18 676,594.12 70°13'52.598 N 148°34'28.004 W 11,466.70 93.17 296.78 8,886.94 -1,818.22 852.65 5,936,211.54 676,572.56 70°13'52.695 N 148°34'28.624 W 11,505.50 93.13 303.33 8,884.80 -1,798.83 819.13 5,936,230.14 676,538.60 70°13'52.886 N 148°34'29.598 W 11,537.82 90.95 306.86 8,883.65 -1,780.26 792.71 5,936,248.09 676,511.76 70°13'53.068 N 148°34'30.366 W 11,568.67 89.38 311.97 8,883.56 -1,760.68 768.89 5,936,267.11 676,487.48 70°13'53.261 N 148°34'31.058 W 11,597.97 88.47 315.66 8,884.11 -1,740.40 747.75 5,936,286.89 676,465.88 70°13'53.460 N 148°34'31.672 W 11,635.65 88.25 321.07 8,885.19 -1,712.26 722.74 5,936,314.43 676,440.22 70°13'53.737 N 148°34'32.399 W 11,658.91 85.82 322.10 8,886.40 -1,694.07 708.31 5,936,332.29 676,425.37 70°13'53.916 N 148°34'32.818 W 11,688.71 85.51 318.18 8,888.65 -1,671.26 689.27 5,936,354.64 676,405.80 70°13'54.141 N 148°34'33.371 W 11,718.68 87.02 313.59 8,890.60 -1,649.80 668.45 5,936,375.62 676,384.50 70°13'54.352 N 148°34'33.976 W 11,748.74 87.94 310.50 8,891.93 -1,629.69 646.15 5,936,395.20 676,361.74 70°13'54.549 N 148°34'34.624 W 11,780.84 90.49 307.80 8,892.37 -1,609.43 621.27 5,936,414.87 676,336.39 70°13'54.749 N 148°34'35.347 W 11,810.60 92.42 305.35 8,891.61 -1,591.70 597.38 5,936,432.04 676,312.09 70°13'54.923 N 148°34'36.041 W 11,838.91 92.49 302.73 8,890.40 -1,575.87 573.94 5,936,447.32 676,288.30 70°13'55.079 N 148°34'36.722 W 11,864.13 92.30 299.99 8,889.34 -1,562.76 552.43 5,936,459.92 676,266.49 70°13'55.208 N 148°34'37.347 W 11,892.63 91.14 296.93 8,888.49 -1,549.18 527.39 5,936,472.91 676,241.14 70°13'55.341 N 148°34'38.074 W 11,923.32 88.89 294.27 8,888.48 -1,535.93 499.71 5,936,485.52 676,213.16 70°13'55.472 N 148°34'38.878 W 11,953.56 87.18 290.42 8,889.52 -1,524.44 471.77 5,936,496.35 676,184.96 70°13'55.585 N 148°34'39.690 W 11,974.00 87.18 290.42 8,890.52 -1,517.32 452.64 5,936,503.02 676,165.67 70°13'55.655 N 148°34'40.246 W TD 10/182011 9:13:12AM Page 4 COMPASS 2003.16 Build 73 TRE = GRAY WELLHEAD= GRAY J M D D R) SAF IOTES: WELL ANGLE>70°@ 9930'***ORIG ACTUATOR= AXELSON 1 4-28A WBS'i4-28 NOT SHOWN BELOW WHIPSTOCK*** KB.ELEV= 71' BF. ELEV= 5-1/2"TBG, 17#, -{ 23' I 23' -I5 1/2"X 4-1/2"XO, ID=4.892" KOP= 3800' L-80, .0232 bpf, Max Angle= 112°@ 10097' ID=4.892" ® 2185' -i4-1/2"CAM BAL-O SVLN NIP, ID= 3.813" Datum MD= 9680' Datum TVD= 8800'SS 20"CONDUCTOR, 110' , 94#,H 40, 3001' -4-1/2"X 3-1/2"XO, ID=2.992" ID=19.124" GAS LIFT MANDRELS 13-3/8"CSG,72#, L-80 BUTT, ID=12.347" 2494' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DOME RK 16 11/04/11 4-1/2"TBG, 12.6#, L-80, .0152 bpf, ID=3.958" - 3001' 2 5401 5186 36 TGPDX SO RK 20 11/04/11 3 6754 6285 35 TGPDX DMY RK 0 09/09/96 9-5/8"X 7"LTP w/LNR HGR - 4486' 4 7709 7077 32 TGPDX DMY RK 0 05/18/11 &TIEBACK SLV, ID=6.25" 5 8959 8187 21 TGPDX DMY RK 0 09/09/96 6 9080 8300 21 TGPDX DMY RK 0 09/09/96 4 9-5/8"CSG,47#, L-80 BTC XO TO SOO-95 BTC - 8604' •% �4 Minimum ID = 1.78" @ 8989' • • ;, 8985' -135 BKR KB LTP, ID=1.875"(10/20/11) SELBRT PLUG BUSHING ;, , : 8989' 2.70"DEPLOYMENT sI v, ID=1.780" • I �4• 3-1/2"TOP OF CEMENT 8989' • '*i 9201' -17"X 4-1/2"BKR S-3 PKR, ID=3.875" �4r4 2«ci ♦ ; % .: .• I 9226' H 3-1/2"HES XN NIP,MILLED TO 2.80"(09/11/11) • 3-1/2"TBG,9.3#, L-80, .0087 bpf, ID=2.992" - 9238' • ,/, A 9238' -13-1/2"LOC SEAL ASSY W/O SEALS-J . 0111 .4 9241' -1 7"X 3-1/2"BKR FB-1 PKR ASSY, ID=4.00" • A, • �. 9255' --15'MILLOUT EXTENSION, ID=4.50" • 1 I • •7"SCAB LNR,29#, L-80 AB MOD-BTC, - 9314' ♦ 01 1 �4 9260' -I5-1/2"X 3-1/2"XO, ID=2.992" .0371 bpf, ID=6.184" q 4 ' .. TOP OF 7"LNR - 9314' , ) 4• 9314' --19-5/8"X 7"BKR LTP&TIEBACK SLV, ID=? 1 3-1/2"TBG-PC,9.3#, L-80, .0087 bpf, ID=2.992" --1 9333' ! ' -1 9323' --I3-1/2"OTIS XN NIP, MILLED TO 2.80"(09/11/11) 1 1 9-5/8"CSG,47#,SOO-95 BTC, ID=8.681" - 9618' 1 9332' -13-1/2"BKR SHEAROUT SUB PERFORATION SUMMARY ���� �t�t 9333' H 3-1/2"WLEG, ID=2.992" REF LOG: BHI MWD ON 10/17/2011 •• •• ANGLE AT TOP PERF:87°@ 11201' �+ SS 9328' H ELMD TT LOGGED 06/30/90 • .• •,.• � Note: Refer to Production DB for historical perf data 1 #��. SIZE SPF INTERVAL Opn/Sqz DATE ••,4 141 •• 1-14/25" 6 11201 - 11250 0 10/23/11 $"$' $''' • 1-14/25" 6 11410- 11600 0 10/23/11 •$� .. .4.4 1..4 ./4 .• .10i •,•4 7"WHIPSTOCK SET©9667'(10/05/11) .i4 X44 MILLOUT WINDOW(14-28A) 9668'-9673' 7"LNR,29#, L-80 BTC, .0371 bpf, ID=6.184" H -9667' J�� PBTD -1 11649' 2-3/8"LNR,4.4#, L-80 STL, .0039 bpf,ID=1.995" H 11674' '0 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/24/82 PKR 191 ORIGINAL COMPLETION 05/21/11 MBM/PJC GLV G O(05/18/11) WELL: 14-28A 01/08/90 NORDIC 1 RWO 09/18/11 SJW/PJC MILL XN/CMT CAP(9/11-12/11) PERMIT No:r2111050 09/09/96 D-16 RWO 11/06/11 PJC DRAWING HO CORRECTIONS API No: 50-029-20708-01 10/26/11 NORDIC2 CTD 11/08/11 ?/PJC DRAWING CORRECTIONS SEC 9,T1ON,R14E,2341'FNL&822'FEL 01/09/02 RN/TP CORRECTIONS 11/15/11 ?/JMD DRLG DRAFT CORRECTIONS 05/31/06 DTM WELLHEAD CORRECTION BP Exploration(Alaska) North America -ALASKA- BP Page 1 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C:(3,100,427.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/1/2011 09:00 - 15:00 6.00 MOB N WAIT PRE STANDBY ON C-PAD. WAITING ON DOYON 16 TO COMPLETE MOVE TO Z-PAD. REMOVE MATS FROM AROUND WELL HEAD. MOVE MAN CAMP FROM C-PAD TO DS 14. 15:00 - 21:00 6.00 MOB N WAIT PRE CONTINUE TO STAND BY FOR COMPLETION OF DOYON 16 MOVE. 21:00 - 21:30 0.50 MOB P PRE HELD DETAILED PJSM FOR RIG MOVE TO DS-14.WITH- SECURITY,WSL,NORDIC FIELD SUPERINTENDANT,TOUR PUSHER,CREW. 21:30 - 00:00 2.50 MOB P PRE MOVE FROM C-10B TO 14-28A CURRENTLY ON SPINE RD CLOSE TO CPS. 10/2/2011 00:00 - 02:30 2.50 MOB P PRE MOVE RIG TO 14-28A. 02:30 - 03:30 1.00 MOB N WAIT PRE WAIT ON RIG MATS TO BE SPOTTED AT DS14 PAD ENTRANCE. 03:30 - 04:00 0.50 MOB P PRE TURN ONTO DS 14 ACCESS RD.TRAVELING OVER MATS AT PAD ENTRANCE. 04:00 - 06:00 2.00 MOB P PRE PJSM,SPOT EQUIPMENT AND CELLAR MATS. PREP TO SPOT RIG OVER WELL. 06:00 - 06:30 0.50 MOB P PRE CREW CHANGE. DISSCUSS RIG STATUS AND OPS. MAKE RIG CHECKS AND OUTSIDE ROUNDS. CONTINUE TO SPOT MATS FOR RIG PLACEMENT. 06:30 - 07:15 0.75 MOB P PRE SPOT RIG MATS. 07:15 - 07:45 0.50 MOB P PRE HOLD PJSM TO DISCUSS PROCESS FOR MOVING OVER WELL. DISCUSS COMMS IN DETAIL INCLUDING RADIO FAILURE,HAND SIGNALS,SPOTTER ASSIGNMENTS. 07:45 - 09:00 1.25 MOB P PRE MOVE RIG OVER WELL. LEVEL RIG.SECURE CELLAR. ACCEPT RIG AT 0830 HRS ON 10/02/11 09:00 - 10:30 1.50 RIGU P PRE PJSM.LIFT REEL AND INSTALL IN REEL HOUSE. REDRESS REEL BUSHINGS. FINISH REEL INSTALLATION. 10:30 - 16:00 5.50 BOPSUR P PRE HOLD PJSM.NU BOPS IN CELLAR. MU HARDLINE INSIDE REEL. MU JUNCTION BOX ELECTRICAL CONNECTIONS. 16:00 - 18:00 2.00 BOPSUR P PRE BODY TEST BOPS. TAKE ON USED POWER VIS MUD IN PITS. 18:00 - 18:30 0.50 BOPSUR P PRE CREW CHANGE. DISCUSS ONGOING RIG OPS. PJSM FOR TESTING BOPE. AOGCC REP BOB NOBLE WAIVED WITNESS ON BOP TEST. 18:30 - 22:00 3.50 BOPSUR P PRE TEST BOPE,RAMS,CHOKE MANIFOLD VALVES,HCR KILL,HCR CHOKE, KILL VALVE, MAN 3"VALVE.2-FLOOR VALVES,ANNULAR TO 250/3500 PSI 5 MIN EACH. PERFORM ACCUMULATOR DRAW DOWN TEST. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 2 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) I Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time: 3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations I (hr) (ft) 22:00 - 22:30 0.50 BOPSUR P PRE HELD HIGH LEVEL-H2S RIG EVACUATION DRILL,MAN DOWN IN PIT AREA. MUSTER TO SAFE AREA.GOOD DRILL. CONDUCT AAR- NEED WINDSOCK ON SAT OFFICE. SPOC SHACK IS THE PRIMARY MUSTER AREA. EVERYONE DID A GOOD JOB OBSERVING WIND DIRECTION,USING SECONDARY MUSTER AREA. WHEN DOING HEAD COUNT SCS DID NOT RESPOND ABOUT MISSING MAN. 22:30 - 00:00 1.50 BOPSUR P PRE PJSM FOR PULLING COIL ACROSS. M/U STUFFING BOX.CHANGE WINCH CABLE FOR PULLING COIL. PULL TEST GRAPPLE. 10/3/2011 00:00 - 01:15 1.25 BOPSUR P PRE RE-TIGHTEN GRAPPLE., REMOVE SHIPPING BAR AND COIL CLAMPS. PULL COIL ACROSS, STAB COIL. 01:15 - 02:15 1.00 BOPSUR P PRE FILL COIL WITH 8.6 PPG POWER PRO MUD. TEST BOTH MUD PUMP TRIPS. 02:15 - 03:40 1.42 BOPSUR P PRE PJSM FOR TESTING INNER REEL VALVE, P/U INJECTOR-M/U LUBRICATOR. STAB INJECTOR. TEST INNER REEL VALVE,PACKOFF AND BULKHEAD TO 250/3500 PSI 5 MIN EACH. 03:40 - 03:55 0.25 BOPSUR P PRE PUMP SLACK BACK. 03:55 - 05:15 1.33 BOPSUR P PRE PJSM,REVIEW SOP FOR CUTTING COIL. R/U AND CUT 175'OF COIL. R/D CUTTER. 05:15 - 06:00 0.75 BOPSUR P PRE PUMP SLACK FORWARD. 06:00 - 06:30 0.50 BOPSUR P PRE CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO PRE COIL. 06:30 - 10:00 3.50 BOPSUR P PRE RU DSM LUBRICATOR. HOLD PJSM TO DISCUSS PT LUBRICATOR AND SHUTTING SSV BEFORE GETTING OFF WELL.ALSO REVIEW PROCEDURE FOR CONSISTENCY. PT LUBRICATOR TO 250 AND 3500 PSI. GOOD TEST. OPEN WELL. ENGAGE BPV. NO PRESSURE NOTED ON WELL. SHUT IN WELL. ND LUBRICATOR. LD BPV. RD DSM. 10:00 - 13:00 3.00 STWHIP P PROD1 DRESS COIL. MU E-COIL HEAD AND ELECTRICAL CONNECTIONS. TEST FOR RES AND COND. PT AND PULL TEST. 13:00 - 14:30 1.50 STWHIP P PROD1 MU PILOT MILLING BHA INCLUDE 0.9 AKO BHI MTR AND HCC D331 2.80"MILL. STAB COIL. TEST TOOLS. GET ON WELL. 14:30 - 15:30 1.00 STWHIP P PROD1 RUN IN HOLE. CIRC AT MIN RATE. TAKE DIESEL RTNS OUTSIDE. NOTE INCREASE IN RTNS. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 3 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 17:15 1.75 STWHIP P PROD1 CIRC BTMS UP FROM 3269. HOLD 150 PS WHP WHILE TAKING RTNS TO TIGER TANK. MONITOR WELL FOR 10 MIN. NO FLOW. 17:15 - 18:00 0.75 STWHIP P PROD1 CONTINUE TO RIH. 18:00 - 18:35 0.58 STWHIP P PROD1 CREW CHANGE.DISCUSS ONGOING RIG OPS. MAKE EQUIPMENT AND FLUID CHECKS. RIH,TAG TOC AT 9312.5' 18:35 - 19:25 0.83 STWHIP P PROD1 OPEN EDC.CBU DISPLACING WELL TO 8.6 PPG USED POWER VIS MUD. PUMPING 1.87 BPM,2900 PSI.TAKE KCL TO TIGER TANK, I/A=26 PSI,O/A=71 PSI. 19:25 - 19:40 0.25 STWHIP P PROD1 POH TO 8800'-CLOSE EDC FLOWCHECK WELL-STATIC. 19:40 - 21:20 1.67 STWHIP P PROD1 GR-LOG DOWN FROM 8800'@ 120 FPH,TIE IN AT 8936,+1 FT CORRECTION CCL-LOG DOWN FROM 8937'TO 9290' 21:20 - 21:35 0.25 STWHIP P PROD1 SPR RATES#1 AND#2 MP. 21:35 - 00:00 2.42 STWHIP P PROD1 BEGIN MILLING PILOT HOLE,DRILL CMT AT 9313.4', PUMPING 1.82 BPM,FS=3315 PSI. ROP=30 FPM,DHWOB=1K TO 9323' 2 STALLS AT 9323' MILLING FROM 9325'DHWOB=1-1.7K, ROP= 20-24 FPH, 250 PSI MOTOR WORK. PVT=280 BBLS.I/A=32 PSI.O/A=81 PSI. MILLING TO 9365' 10/4/2011 00:00 - 06:00 6.00 STWHIP P PROD1 MILL 2.80 PILOT HOLE FROM 9365' PUMPING 1.82 BPM,FS=3315 PSI. DHWOB=1.5K,ROP=20 FPH, 250 PSI MOTOR WORK. PVT=280 BBLS.I/A=34 PSI.0/A=90 PSI. 06:00 - 06:30 0.50 STWHIP P PROD1 CREW CHANGE. DISCUSS RIG OPS AND STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE MILLING PILOT HOLE. 06:30 - 13:00 6.50 STWHIP P PROD1 MILL AHEAD FROM+/-9500' 3250 PSI FS AT 1.84 BPM IN/OUT. 200-300 DPSI. 1.7-2.0K#DHWOB. ROP:20-30 FPH. BHP/ECD/TVD:4489 PSI/10.0 PPG/8798' IA/OA/PVT:43 PSI/115 PSI/237 BBLS. A FEW STALLS NOTED. MILL TO 9656'. 13:00 - 16:30 3.50 STWHIP P PROD1 MILL AHEAD FROM 9656'. 3750 PSI FS AT 1.75 BPM IN/OUT. 200-300 PSI MTR WORK. 1.5-1.8K#DHWOB. ONE OR TWO STALLS. MILL TO 9728'. 16:30 - 17:30 1.00 STWHIP P PROD1 DRESS PILOT IN CONTACT AREA AS PER WELL PLAN. BACK REAM FROM 9325'AT 1 FPM. TF:290DEG MAKE 2ND PASS FROM 9330'AT 1 FPM. TF: 290 DEG. Printed 11/14/2011 1 3647P North America -ALASKA- BP Page 4 of 19 Operation Summary Report Common Well Name. 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 End Date: X3-010QL-C:(3,100,427 00) Project: Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 20:30 3.00 STWHIP P PROD1 OPEN EDC.CIRC OUT OF HOLE. PVT:239 BBLS. FLOW CHECK WELL-STATIC 20:30 - 21:00 0.50 STWHIP P PROD1. PJSM FOR UD BHA. RACK BACK INJECTOR HEAD. HOLD WELL CONTROL DRILL WITH NON SHEARABLES ACROSS STACK.CREW PULL "'BHA FROM WELL AND CLOSED BLINDS- COMPLEXITY OF HYDRAULIC LINE FAILED WHILE BLIND WHERE CLOSING. AAR-CREW RESPONDED TO ALL POSITION WELL,DURING PJSM FOR BHA IT WAS DISCUSSED TO POOH WITH BHA. WHEN BLINDS WHERE CLOSING THE TOUR PUSHER ANNOUNCED THAT HYDRAULIC FLUID WAS SEEN SPRAYING IN THE CELLAR, MOTOR MAN WENT TO CHECK IN THE CELLAR.IT WAS DISCUSSED THAT THE BEST ACTION WOULD HAVE BEEN FOR THE MOTOR MAN TO NEUTRALIZE THE CONTROL HANDLE AND STOP LEAK BEFORE ALL FLUID WAS PUMPED FROM ACCUMULATOR.THE CREW HAD A GOOD CONVERSATION OF THE EVENT AND DISCUSSED THE POSSIBLE 'SCENARIOS THAT COULD HAVE TAKEN PLACE. CEMENT MILL WAS GO AND IN GUAGE. 21:00 - 22:00 1.00 STWHIP P PROD1 PJSM P/U DRIFT BHA. RIH TO 57.54' M/U INJECTOR HEAD. TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH-GOOD TEST. 22:00 - 00:00 2.00 STWHIP P ' PROD1 RIH WITH DRIFT BHA AT80 FPM RATE OF.56 BPM AND 1421 PSI. PVT OF 303 BBLS. 10/5/2011 00:00 - 01:00 1.00 STWHIP P PROD1 RIH WITH DRIFT BHA TO 8870' TIE IN WITH 0 CORRECTION. 01:00 - 01:30 0.50 STWHIP P PROD1 RIH WITH DRIFT TO 9729' NO ISSUES AT.5 BPM AND 1420 PSI. 01:30 - 03:30 2.00 STWHIP P PROD1 POOH WITH DRIFT BHA FROM 9729'TO 57' MONITOR WELL-STATIC. 03:30 - 04:00 0.50 STWHIP P PROD1 R/B INJECTOR HEAD. UD DRIFT BHA. 04:00 - 04:45 0.75 STWHIP P PROD1 M/U PDS CALIPER BHA. M/U INJECTOR HEAD. TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH.GOOD TEST. 04:45 - 06:00 1.25 STWHIP P PROD1 RIH WITH PDS CALIPER BHA. PVT OF 304 BBLS. PUMPS AT.5 BPM AND 945 PSI AT 65 FT/MIN. 06 00 - 06.30 0.50 STWHIP P PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO RIH WITH CALIPER BHA. 06:30 - 07:00 0.50 STWHIP P PROD1 CONTINUE TO RIH. BEGIN LOGGING TIE UNABLE TO COMPLETE TIE IN DUE TO PRESET CALIPER TOOL TIMING.STOP COIL AT 8879'. TOOL OPENED. 07:00 - 07:45 0.75 STWHIP N HMAN PROD1 WAIT ON CALIPER TOOL TO CLOSE. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 5 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:45 - 09:15 1.50 STWHIP N HMAN PROD1 CIRCULATE OUT OF HOLE. HOLD PJSM TO DISCUSS TRIP. HOLD PJSM TO DISCUSS HANDLING THE BHA. 09:15 - 10:45 1.50 STWHIP N HMAN PROD1 FLOW CHECK. GET OFF WELL. UNSTAB • COIL. CHANGE OUT BATTERIES. RESET AND TEST CALIPER TOOL. STAB COIL. GET ON WELL. TEST LUBRICATOR MU. 10:45 - 13:45 3.00 STWHIP N HMAN PROD1 RUN IN HOLE. CIRC AT MIN RATE THROUGH EDC. LOG GR TIE IN. NO CORRECTION. 13:45 - 14:30 0.75 STWHIP P PROD1 LOG CALIPER FROM 9715 TO 8000'. ALLOW CALIPER ARMS TO CLOSE. 14:30 - 16:00 1.50 STWHIP P PROD1 CIRCULATE OUT OF,HOLE. EDC OPEN. HOLD PJSM NEAR SURFACE. 16:00 - 17:00 1.00 STWHIP P PROD1 AT SURFACE. GET OFF WELL. UNSTAB COIL. REMOVE CALIPER TOOL. BLOW DOWN INTEQ TOOLS. 17:00 - 18:30 1.50 STWHIP P PROD1 " MU BTT WHIPSTOCK ON INTEQ BHA. MU INJECTOR HEAD -TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH.GOOD TEST 18:30 - 21:30 3.00 STWHIP P PROD1 RIH WITH WHIPSTOCK TO 8944' OPEN EDC 60 FT/MIN AT.13 BPM AND 948 PSI TIE IN WITH-4'CORRECTION. 21:30 - 00:00 2.50 STWHIP P PROD1 WAIT ON PDC LOG AT 8944' HOLD UN-ANNOUNCED SPILL DRILL WITH MAN DOWN DRILL AND AAR.WHILE WAITING ON PDS LOGS. RECEIVED PDC LOG AND DISCUSSED BEST OPTION OF SETTING WHIPSTOCK WITH PDC MAT,ENGINEER ZACH AT ANCHOR POINT OF 9676.5'AND 110 DEGREE. 10/6/2011 00:00 - 01:30 1.50 STWHIP P PROD1 RIH AT 20'HR THRU CEMENT TO 9686' P/U AND SET ANCHOR OF WHIPSTOCK AT 9676.5' 01:30 - 02:00 0.50 STWHIP P PROD1 ORIENT WHIPSTOCK TO 110 DEGREE. CLOSE EDC. PRESSURE UP TO SHEAR WHIPSTOCK AT 3800 PSI. SHOW INCREASE IN WOB OF4.61K GIVING GOOD INDICATION OF SETTING WHIPSTOCK. P/U CLEAN. _TOP OF WHIPSTOCK AT 9666.72' 02:00 - 04:30 2.50 STWHIP P PROD1 POOH AT 100' PER MINUTE PUMP RATE AT 1.3 BPM AND 260 PSI MONITOR WELL STATIC 04:30 - 06:00 1.50 STWHIP P PROD1 LAY DOWN WHIPSTOCK RUNNING TOOLS RACK BACK INJECTOR HEAD 06:00 - 06:30 0.50 STWHIP P WEXIT CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO MU MILLING BHA. Printed 11/14/2011 1:36:47PM 4 North America -ALASKA- BP Page 6 of 19 Operation Summary Report Common Well Name 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 End Date: 'X3-010QL-C: (3,100,427.00) Project:Prudhoe Bay Site:PB DS 14 • Rig Name/No.:NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:00 0.50 STWHIP P WEXIT MU WINDOW MILLING BHA. INCLUDE 0.9 AKO INTEQ MTR WITH HCC STRING REAMER AND DSM(2.80") STAB COIL.TEST TOOLS GET ON WELL. PT LUB CONNECTION. 07:00 - 09:00 2.00 STWHIP P WEXIT RIH. CIR AT 0.44 BPM @ 1080 PSI. PVT:317 BBLS. 09:00 - 09:15 0.25 STWHIP P WEXIT LOG GR TIE IN FROM 8800'. SUBTRACT 4' CORRECTION. SPR#1:0.5/1.0 BPM-1390/2050 PSI SPR#2:0.5/1.0 BPM-1370/2020 PSI. 09:15 - 09:45 0.50 STWHIP P WEXIT RIH. TAG HARD SPOT AT 9647' ORIENT TO 110R. MILL THROUGH SAME. NO MOTOR WORK OR WEIGHT. TAG WHIPSTOCK AT 9668'. 09:45 - 12:30 2.75 STWHIP P WEXIT MIL`WINDOW FROM 9668'. PUT 2K#DN WT TO ESTABLISH PATTERN AND MINIMIZE CHANCE OF ROLLING OFF TRAY. 3550 PSI FS AT 1.74 BPM IN/OUT. 100-150 PSI MTR WORK. 2.OK#DHWOB. MILL AT APPROXIMATELY 0.1' PER 5-6 MINUTES. 12:30 - 15:30 3.00 STWHIP P WEXIT MILL AHEAD FROM 9670'. BHP/ECD/TVD:4488 PSI/9.93 PPG/8798' IA/OA/PVT:40 PSI/127 PSI/339 BBLS. MILL AHEAD TO 9673.5'. MAY BE EXITING CASING. DECIDE TO CONTINUE TIME MILLING IN CASE STILL IN CASED HOLE. 15:30 - 16:30 1.00 STWHIP.- P WEXIT MILL AHEAD FROM 9673.5' 3550 PSI FS AT 1.73 BPM IN/OUT. 50 PSI MOTOR WORK. 0.5K#DHWOB. 16:30 - 20:00 3.50 STWHIP P WEXIT DRILL FORMATION RATHOLE. TOP OF WINDOW:9668' BOTTOM OF WINDOW:9673' DRILL TO 9684'. DRESS AND CLEAN WINDOW,RUN THROUGH 3 TIMES NO PROBLEMS. SHUT DOWN PUMPS AND PULL UP TO 9657' NO PROBLEM.RIH TO 9684'WITH NO PROBLEMS. 20:00 - 23:00 3.00 STWHIP P WEXIT POOH FOR BUILD BHA. PVT AT 342 BBLS,PUMP RATE OF.35 BPM AND 1234 PSI.PULLING SPEED OF 4 FT/MIN THROUGH PILOT HOLE AND 32K UP WEIGHT. PULL ABOVE PILOT HOLE OPEN EDC PUMP RATE 1.7 BPM.IA/OA/PVT:44 PSI/135 PSI/ 335 BBLS. MONITOR WELL-STATIC. 23:00 - 23:30 0.50 STWHIP P WEXIT RACK BACK INJECTOR HEAD. L/D BHA.MILL GAUGED AT 2.80 NO-GO AND 2.81 GO. 23:30 - 00:00 0.50 STWHIP P WEXIT PU BUILD BHA#7 WITH A NEW RAPTOR BIT MU INJECTOR HEAD Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 7 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: ,X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/7/2011 00:00 - 03:00 3.00 DRILL P PROD1 TEST QTS TO 250 LOW 3500 HIGH GOOD TEST RIH @.31 BBM AT 863 PSI,60 FPM AND PVT AT 18 BBLS TIE IN AT 8894'WITH A-4'CORRECTION. 03:00 - 03:30 0.50 DRILL P PROD1 ADJUST REEL MOTORS IN REEL HOUSE 03:30 - 04:15 0.75 DRILL P PROD1 RIH THROUGH CEMENT PILOT HOLE RATE 025 BPM @ 1230 PSI AND 13 FPM 04:15 - 06:00 1.75 DRILL P PROD1 DRILLING AHEAD @ 9685' PUMP RATE 1.5 BPM @ 3200 PSI WOB 1.8 AK ECD 9.9 IA 38/OA 133/PVT 95(DISPLACING) ROP 200 MWI 8.65 PPG MWO 8.69 PPG 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DICUSS OPS AND RIG STATUS WITH NIGHT CREW. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO DRILL AHEAD FROM 9725'. RECORD SPM RATES AND PRESSURES. #1 0.5/1.0 BPM 1450/2050 PSI #2 0.5/1.0 BPM 1450/2070 PSI 06:30 - 11:15 4.75 DRILL P PROD1 DRILL AHEAD FROM 9725'. 3050 PSI FS AT 1.62 BPM IN/OUT. 1.97K# DHWOB. 150 PSI MTR WORK. ROP:10-120 FPH IN SHUBLIK FORMATION. BHP/ECD/TVD:4512 PSI/9.84 PPG/8798' IA/OA/PVT:38 PSI/132 PSI/267 BBLS. DRILL TO 9850'. DOGLEG TOO LOW IN ZONE 4. 11:15 - 13:15 2.00 DRILL P PROD1 PULL TO WINDOW. OPEN EDC. CIRCULATE OUT OF HOLE. 2915 PSI AT 2.03 BPM. 395 BBLS. 13:15 - 15:00 1.75 DRILL P PROD1 AT SURFACE FLOW CHECK. GET OFF WELL. UNSTAB COIL. LD MOTOR. BIT 1-1-i. ADJUST AKO FROM 1.8 TO 2.2 DEG. MU MTR. STAB COIL TEST TOOLS. GET ON WELL. TEST LUBRICATOR CNXN. 15:00 - 16:30 1.50 DRILL P PROD1 RUN IN HOLE. 16:30 - 16:45 0.25 DRILL P PROD1 LOG GR TIE IN FROM 8870'. NO CORRECTION. 16:45 - 17:15 0.50 DRILL P PROD1 RUN IN HOLE. CIRC AT MIN RATE THROUGH PILOT HOLE. 17:15 - 19:15 2.00 DRILL P PROD1 DRILL AHEAD FROM 9850'. 3010 PSI FS AT 1.67 BPM IN/OUT. 300-400 PSI MOTOR WORK. 2.22K#DHWOB DRILL TO 9927'WITH FIRST DLS OF 31.96 AND DRILLED 15'WITH A SECOND AT 33.2 AFTER DISCUSSION POOH TO ADJUST MOTOR. 19:15 - 22:00 2.75 DRILL P PROD1 POOH WITH FLOW CHECK AT WINDOW- STATIC POOH WITH EDC OPEN AND FLOW RATE OF 2.14 BPM AND 3149 PSI MONITOR WELL-STATIC. 22:00 - 22:30 0.50 DRILL P PROD1 STAND BACK INJECTOR HEAD. POOH WITH BHA. ADJUST AKO ON BHA FROM 2.2 TO 2.0 DEG. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 8 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C:(3,100,427.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:00 0.50 DRILL P PROD1 RIH WITH BHA. BIT 1-1-i. M/U INJECTOR HEAD. 23:00 - 23:30 0.50 DRILL P PROD1 PRESSURE TEST QTS 250 PSI LOW AND 3500 PSI HIGH.-GOOD TEST. 23:30 - 00:00 0.50 DRILL P PROD1 RIH IN THE HOLE.@ 3 BBL MIN W/960 PSI CHECK THE OUT MICRO MOTION AS GIVING FALSE READINGS ON DENSITY. PVT OF 373 BBLS. 10/8/2011 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE TO RIH IN THE HOLE.@ 3 BBL MIN W/960 PSI CHECK THE OUT MICRO MOTION AS GIVING FALSE READINGS ON DENSITY. PVT OF 373 BBLS. TIE IN AT 8887'W/A-4'CORRECTION LOG FROM 9660'TO 9690' CONTINUE TO RIH TO TARGET DEPTH @ 9927'OBTAINED SPR OF#1 -.5BPM= 1465, 1 BPM= 1948,#2-.5=1439, 1 BPM=1935 03:00 - 06:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 9927'TO 10073' PUMP RATE OF 1.63 BPM @ 1619 PSI IN RATE IF 1.62 BPM @ 8.67 PPG/OUT RATE OF 1.67 BPM @ 8.58 PPG CIRCULATING PSI OF 3024 PSI, IA OF 35 PSI/ OA OF 133 PSI 0.81 K#DHWOB ECD OF 9.89 PPG ROP OF 90 FPM. DRILL TO 10123'. 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS AND CHECKS. CONTINUE TO POOH FOR MOTOR ANGLE CHANGE/LATERAL BHA. 06:30 - 08:30 2.00 DRILL P PROD1 CIRCULATE OUT OF HOLE. 3120 PSI AT 2.17 BPM. EDC IS OPEN. PVT:402 BBLS HOLD PJSM NEAR SURFACE. _ 08:30 - 09:30 1.00 DRILL P PROD1 AT SURFACE. FLOW CHECK. GET OFF WELL. UNSTAB COIL. LD INTEQ TOOLS. 09:30 - 10:00 0.50 BOPSUR P PROD1 WEEKLY BOP FUNCTION TEST. NORDIC DRILERS FLOOR CONSOLE USED 136e FOR TEST. 10:00 - 11:00 1.00 DRILL P PROD1 MU LATERAL DRILLING BHA. STAB COIL. TEST TOOLS. GET ON WELL. TEST LUBRICATOR CNXN. 11:00 - 13:30 2.50 DRILL P PROD1 RUN IN HOLE. 13:30 - 13:45 0.25 DRILL P PROD1 LOG GR TIE IN. SUBTRACT 4'CORRECTION. 13:45 - 14:00 0.25 DRILL P PROD1 RUN THROUGH PILOT HOLE AND WINDOW RIH. BRING ON PUMPS. 3120 PSI FS T 1.7 BPM IN. 14:00 - 15:30 1.50 DRILL P PROD1 DRILL AHEAD FROM 10,123'. 3050 PSI FS AT 1.56 BPM IN/OUT. 100-200 PSI MTR WORK. DHWOB:2.14K# DRILL TO 10256'. GETTING 19-20 DOG LEGS WITH 1.0 AKO MTR. Printed 11/14/2011 1:36:47PM • North America -ALASKA- BP Page 9 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum: Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 17:30 2.00 DRILL P PROD1 MAKE MAD LOGGING PASS FROM 10,256'TO WINDOW. 2910 PSI FS AT 1.6 BPM IN. PVT:401 BBLS. LOG AT 3 FPM. 17:30 - 19:30 2.00 DRILL P PROD1 OPEN EDC. PULL OUT OF HOLE. PVT:393 BBLS 19:30 - 21:30 2.00 DRILL P PROD1 MONITOR WELL @ BHA=STATIC STAND BACK INJECTOR HEAD,L/D BHA,ADJ MOTOR ANGLE T/0.8, BIT 1-1-i P/U BHA,M/U INJECTOR HEAD AND TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH- GOOD TEST. PVT ON SURFACE IS 354 BBLS. 21:30 - 00:00 2.50 DRILL P PROD1 RIH AND LOG GR TIE IN SUBTRACT 3.5' CORRECTION CONTINUE T/RIH T/TARGET DEPTH @ 10256' 10/9/2011 00:00 - 02:15 2.25 DRILL P. PROD1 DRILL AHEAD FROM 10256'TO 10373' PUMP RATE OF 1.47 BPM @ 2890 PSI IN RATE IF 1.47 BPM @ 8.69 PPG/OUT RATE OF 1.48 BPM @ 8.61 PPG CIRCULATING PSI OF 2890 PSI, IA OF 40 PSI/ OA OF 139 PSI 1.28 K#DHWOB ECD OF 10.01 PPG ROP OF 90 FPH. PVT=387 BBLS SPR#1@.5 BBLS MIN=1508 PSI @ 1 BBL MIN= 2055 PSI @ 1.5 BBLS MIN=2750 PSI SPR#2 @.5 BBLS MIN=1520 PSI @ 1 BBL MIN= 2014 PSI @ 1.5 BBLS MIN=2736 PSI 02:15 - 02:45 0.50 DRILL P PROD1 DRILL AHEAD FROM 10373'TO 10400' PUMP RATE OF 1.63 BPM @ 3391 PSI IN RATE IF 1.63 BPM @ 8.7 PPG/OUT RATE OF 1.62 BPM @ 8.66 PPG CIRCULATING PSI OF 3376 PSI, IA OF 44 PSI/ OA OF 139 PSI 2.81 K#DHWOB ECD OF 10.01 PPG ROP OF 77 FPH. INCREASE WOB TO MAINTAIN ROP. PVT=389 BBLS 02:45 - 03:45 1.00 DRILL P PROD1 POOH F/10400'T/WINDOW F/WIPER TRIP 03:45 - 06:00 2.25 DRILL P PROD1 DRILL AHEAD FROM 10400' PUMP RATE OF 1.63 BPM @ 3226 PSI IN RATE IF 1.60 BPM @ 8.7 PPG/OUT RATE OF 1.60 BPM @ 8.65 PPG CIRCULATING PSI OF 3186 PSI, IA OF 45 PSI/ OA OF 140 PSI 2.88 K#DHWOB ECD OF 10.01 PPG ROP OF 23 FPH. PVT=389 BBLS 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS RIG STATUS AND CURRENT OPS. MAKE OUTSIDE AND INSIDE CHECKS AND ROUNDS. CONTINUE TO DRILL AHEAD. 06:30 - 11:15 4.75 DRILL P PROD1 DRILL AHEAD FROM 10,458'. 3050 PSI FS AT 1.62 BPM IN/OUT. 150-300 PSI MTR WORK.2.99K#DHWOB. BHP/ECD/TVD:4669 PSI/10.13 PPG/8880' IA/OA/PVT:50 PSI/144 PS/387 BBLS. DRILLING AT 18-20 FPH IN SHUBLIK. DRILL TO 10,554'. Printed 11/14/2011 1:36:47PM North America -ALASKA BP Page 10 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:15 - 12:00 0.75 DRILL P PROD1 WIPER TRIP TO 9700'. 3047 PSI FS AT 1.64 BPM IN. PVT:386 BBLS. 12:00 - 16:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 10,554'. 3045 PSI FS AT 1.64 BPM IN/OUT. 250 PSI MTR WORK. DHWOB:2.9K# CONTINUE TO DRILL SHUBLIK AT 20-30 FPH. MAINTAIN 103 TO 104 DEG INCLINATION WHILE CLIMBING TOWARDS SAG TARGET INTERVAL. DRILL TO 10630'. 16:00 - 18:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 10630'. 3055 PSI FS AT 1.66 BPM IN OUT. DHWOB:2.7K#. ROP SLOWING SLIGHTLY TO 15-20 FPH. DRILL TO 10686' 18:00 - 22:00 4.00 DRILL N DFAL 10,686.00 PROD1 POOH FROM 10686' FAILED DGS TOOL. MONITOR WELL AT WINDOW.STATIC. OPEN EDC AND OH THRU PILOT HOLE. RATE OF 2 BPM AND 2900 PSI. MONITOR WELL AT BHA-STATIC R/B INJECTOR HEAD. L/D BHA. 22:00 - 00:00 2.00 DRILL P PROD1 R/U AND PRESSURE TEST DUAL FLAPPER CHECKS AFTER 100 HRS OF CIRCULATION. TEST TO 250 PSI LOW AND 3500 PSI HIGH. GOOD TEST 10/10/2011 00:00 - 01:00 1.00 DRILL N DFAL 10,686.00 PROD1 CONTINUE TO CHANGE OUT BHA DUE TO FAILED DGS TOOL. CHANGE BIT OLD BIT GRADE OUT 2- -CC-N-X-BC-NO P/U BIT HCC TYPE RWD2ST304.7 GRADE REBUILD. M/U INJECTOR HEAD. TEST QTS TO 250 LOW AND 3500 PSI HIGH. - GOOD TEST 01:00 - 04:00 3.00 DRILL N DFAL 10,686.00 PROD1 RIH RATE.35 BPM @ 1062 PSI TIE IN AT 8880'WITH A-4'CORRECTION. RIH AND DRILL AHEAD. 04:00 - 05:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 10686' PUMP RATE OF 1.58 BPM @ 3087 PSI IN RATE IF 1.56 BPM @ 8.65 PPG/OUT RATE OF 1.57 BPM @ 8.63 PPG CIRCULATING PSI OF 3043 PSI, IA OF 40 PSI/ OA OF 142 PSI 2.04 K#DHWOB ECD OF 10.12 PPG ROP OF 24 FPH. DISPLACING WELL TO NEW MUD. 10694'SHOWING LOSS OF RETURNS 0.8 BPM DRILLED TO 10,700'WITH NO CHANGE. 05:00 - 06:15 1.25 DRILL N DPRB PROD1 PULL UP TO WINDOW TO EVALUATE LOSSES. DISCUSS WITH TOWN. DECIDE TO RTN TO BTM AND DRILL AHEAD. MONITOR LOSSES WHILE DRILLING. 4 VAC TRUCKS AND 995 BBLS OF MUD ON LOCATION. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 11 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum: Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:15 - 06:30 0.25 DRILL P PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE TO RIH TO BTM AT 10694'. 06:30 - 08:30 2.00 DRILL P PROD1 DRILL AHEAD FROM 10694'. 2800 PSI FS AT 1.55 BPM IN/0.57 BPM OUT. 100 PSI MTR WORK. DHWOB: 1.05K#. BHP/ECD/TVD:4522 PSI/9.89 PPG/8813' IA/OA/PVT:33 PSI/138 PSI/ VARIABLE. 990 BBLS+ON LOCATION OF NEW AND USED MUD. DRILL TO 10801'. NO RETURNS AT 1.55 BPM IN. GEOS DETERMINE WE ARE NOT IN SAG TARGET SAND. 08:30 - 11:00 2.50 DRILL N DPRB PROD1 CIRCULATE OUT OF HOLE TO WINDOW. OPEN EDC. CIRCULATE TO TOP OF PILOT HOLE TO 9289'. ATTEMPT TO FILL HOLE DOWN COIL AT 2.56 BPM FO 20 BBLS. NO RTNS. REDUCE CIRC RATE TO 0.75 BPM. BHP:3679 PSI. FORMATION BHP EST:3282 PSI. DISCUSS PLAN FORWARD WITH TOWN TEAM. ORDER 2%KCL WITH SAFE-LUBE FROM MI/WATER PLANT. GEOS DISCUSSING TARGET ISSUE. 11:00 - 12:00 1.00 DRILL N DPRB PROD1 GEO PLAN FORWARD ESTABLISHED. RUN IN HOLE. CLOSE EDC. SET DN IN WINDOW TWICE AT 11OR TF. ORIENT TO 70R. RUN THROUGH WINDOW CLEAN. CIRC AT MIN RATE. 12:00 - 13:45 1.75 DRILL P PROD1 DRILL AHEAD FROM 10,801'. 2650 PSI FS AT 1.48 BPM IN. 0.0 TO 0.2 BPM RTNS. 0.5K#DHWOB. ROP:60-70 FPH. DRILL TO 10894'. 13:45 - 14:15 0.50 DRILL P PROD1 GEOS EVALUATE ADDITIONAL DATA FROM NEW FOOTAGE. 14:15 - 15:00 0.75 DRILL P PROD1 DRILL AHEAD FROM 10,894. ROP AT 10-12 FPM. VERY HARD DRILLING. GAINING PARTIAL RETURNS. 0.3 TO 0.5 BPM OUT,1.58 BPM IN. DRILL TO 10,899' 15:00 - 16:00 1.00 DRILL P PROD1 MAKE WIPER TRIP WHILE WAITING ON KCL TRUCKS. DO NOT WANT TO DRILL AHEAD WITH PARTIAL RETURNS DUE TO HOLE CLEANING ISSUES. LOAD PITS WITH 2%KCL WITH SAFE-LUBE. 16:00 - 17:00 1.00 DRILL P PROD1 WIPER BACK TO BTM WAITING ON SECOND KCL TRUCK. BEGIN DISPLACEMENT TO KCL. SHUT IN WELL WITH CHOKE.WHP INCREASED TO 550 PSI WITH 1.2 BPM IN AND 0.25 BPM OUT. WHP WILL BE TOO HIGH TO DRILL WITH CHOKE CLOSED. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 12 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE (RON) 7 Start Date: 9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 20:00 3.00 DRILL P PROD1 DRILL AHEAD WITH KCL TO 10977' 2717 PSI FS AT 1.6BPM IN/0.9 BPM OUT. BHP/ECD/TVD:4356 PSI/9.53 PPG/8801'. AT 10940'ROP INCREASED FROM 20'FPH TO 100'FPH. 20:00 - 20:30 0.50 DRILL P PROD1 WIPER BACK TO LOSS ZONE OF 10690' PUMP HI-VIS SWEEP. 2128 PSI AT 1.48 BPM IN/0.28 BPM OUT BHP/ECD/TVD:4043 PSI/8.85 PPG/8799' 20:30 - 21:30 1.00 DRILL P PROD1 DRILL AHEAD WITH KCL TO 11050' 1850 PSI FS AT 1.5BPM IN/0.38 BPM OUT. BHP/ECD/TVD:3695 PSI/8.05 PPG/8800'. AT 11,014'LOST ALL RETURNS.SHUT IN CHOKE 21:30 - 00:00 2.50 DRILL P PROD1 WIPER TRIP TO WINDOW. POH WITH 1.70 BPM @ 1575 PSI RELOG FROM 9950'TO 9900'FOR GEO.CONTINUE TO PULL UP AND TIE IN WTH A PLUS 5' CORRECTION. OPEN EDC TO PULL THROUGH PILOT HOLE. BHP/ECD/TVD:3926 PSI/8.48 PPG/8803 10/11/2011 00:00 - 01:15 1.25 DRILL P PROD1 RIH THROUGH PILOT AND CLOSE EDC PUMP RATE AT 1.52 BPM AND 1436 PSI BHP/ECD/TVD:3926 PSI/8.48 PPG/8803 01:15 - 01:45 0.50 DRILL P PROD1 DRILL AHEAD WITH KCL FROM 11050'TO 11,100' 1663 PSI FS AT 1.51 BPM IN/NO RETURNS. BHP/ECD/TVD:3772 PSI/8.25 PPG/8803'. WELLHEAD PSI OF 18.ROP OF 115 FPH 01:45 - 02:15 0.50 DRILL P PROD1 WIPER TO 10690' PUMP 10 BBL HI-VIS SWEEP. 02:15 - 03:00 0.75 DRILL P PROD1 DRILL AHEAD WITH KCL FROM 11100'TO 11,150' 1626 PSI FS AT 1.50 BPM IN/NO RETURNS. BHP/ECD/TVD:3791 PSI/8.29 PPG/8804'. WELLHEAD PSI OF 18.ROP OF 62 FPH 03:00 - 03:30 0.50 DRILL P PROD1 WIPER TO 10690' PUMP 10 BBL HI-VIS SWEEP. 03:30 - 04:15 0.75 DRILL P PROD1 DRILL AHEAD WITH KCL FROM 11,150'TO 11,200' 1864 PSI FS AT 1.50 BPM IN/NO RETURNS. BHP/ECD/TVD:3932 PSI/8.60 PPG/8807'. WELLHEAD PSI OF 18.ROP OF 72 FPH 04:15 - 06:00 1.75 DRILL P PROD1 WIPER TO THE WINDOW. PUMP 10 BBL HI-VIS SWEEP. 06:00 - 07:00 1.00 DRILL P PROD1 DRILL AHEAD WITH KCL FROM 11,200' 1959 PSI FS AT 1.47 BPM IN/NO RETURNS. BHP/ECD/TVD:3667 PSI/8.02 PPG/8810'. WELLHEAD PSI OF 11.ROP OF 55 FPH WOB 2.65K DRILL TO 11,250'. 07:00 - 08:30 1.50 DRILL P PROD1 WIPER TRIP TO 10,690'. 1534 PSI FS AT 1.53 BPM IN. NO RTNS. WHP:11 PSI. BHP/ECD/TVD:3630 PSI/7.94 PPG/8811'. IA/OA/PVT: 35 PSI/145 PSI/VARIABLE. THREE VAC TRUCKS HAULING KCL, ONE WITH MUD SWEEPS. Printed 11/14/2011 1:36:47PM • North America -ALASKA- BP Page 13 of 19 Operation Summary Report Common Well Name: 14-28 1 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: 'X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site:PB DS 14 - Rig Name/No.:NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 09:00 0.50 DRILL P PROD1 DRILL AHEAD TO 11,300'. 1620 PSI FS AT 1.55 BPM IN. BHP:3683 PSI. ECD:7.94 PPG. 09:00 - 14:30 5.50 DRILL P PROD1 EXTENDED WIPER WHILE GEOS EVALUATE LOG DATA. TRY TO RE-ENTER WINDOW AND CAN'T. TRY VARIOUS TF AND RUNNING SPEEDS. PUMP 1.0 BPM DOWN CT X TBG ANNULUS, PLUS WELL IS TAKING ANOTHER 0.9 BPM THROUGH THE PUMP. 14:30 - 1715 2.75 DRILL N DPRB 9,313.00 PROD1 POOH FOR WINDOW DRESSING BHA. PUMP 1.8 BPM WHILE POOH,MAINTAIN ECD >7.9 PPG WHILE POOH. MONITOR WELL. 17:15 - 20:00 2.75 DRILL N DPRB 9,313.00 PROD1 R/B INJECTOR HEAD. LID BHA. BIT GRADE OF 2-4-CC-N-X-BC-NO CHANGE PACK-OFFS. GATHER WINDOW MILL BHA. CONTINUOUS HOLE FILL OF 1.5 BPM 20:00 - 21:00 1.00 DRILL N DPRB 9,313.00 PROD1 R/U TO TEST PACK-OFFS. FILL WELL WITH 80 BBLS. SHUT IN MASTER VALVE. TEST PACKOFF TO 250 PSI LOW AND 3500 PSI HIGH.-GOOD TEST OPEN MASTER AND CONTINUE HOLE FILL OF 1.5 BPM. R/B INJECTOR HEAD. 21:00 - 22:00 1.00 DRILL N DPRB 9,313.00 PROD1 M/U WINDOW MILL BHA. CONTINUOUS HOLE FILL OF 1.5 BPM. M/U INJECTOR AND TEST. 22:00 - 22:30 0.50 DRILL N DPRB 9,313.00 PROD1 TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH GOOD TEST. MAINTAIN CONTIUOUS HOLE FILL OF 1.5 BPM. 22:30 - 23:45 1.25 DRILL N DPRB 9,313.00 PROD1 RIH WITH BHA. MAINTAIN 1.55 BPM GOING DOWN BACKSIDE AND.3 BPM DOWN TUBING. 23:45 - 00:00 0.25 DRILL N DFAL 5,500.00 PROD1 MWD NO COMMUNICATION. POOH FROM 5500' 10/12/2011 00:00 - 00:45 0.75 DRILL N DFAL 5,500.00 PROD1 MWD NO COMMUNICATION POOH FROM 5500' MAINTAIN 1.55 BPM GOING DOWN BACKSIDE AND.3 BPM DOWN TUBING. MONITOR WELL. 00:45 - 02:00 1.25 DRILL N DFAL 5,500.00 PROD1 R/B INJECTOR. UD BHA FOUND E-LINE PULLED OUT OF SOCKET. REHEADED.P/U BHA. MAINTAIN CONTINUOUS HOLE FILL OF 1.50 BPM. M/U INJECTOR HEADED.AND TESTED TO 250 PSI LOW AND 3500 PSI HIGH GOOD TEST.. 02:00 - 02:30 0.50 DRILL N DFAL 5,500.00 PROD1 RIH WITH BHA TO WINDOW. OPEN EDC. _ PUMP AT 1.5 BPM AT 1736 PSI 02:30 - 03:00 0.50 DRILL N DFAL 5,500.00 PROD1 LOST COMMUNICATION WITH MWD. POOH CONTINUOUS HOLE FILL AT 1.5 BPM. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 14 of 19 Operation Summary Report Common Well Name: 14-28 'AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 1 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 03:30 0.50 DRILL N DFAL 5,500.00 PROD1 MONITOR WELL. R/B INJECTOR HEAD. FOUND ELINE FAILURE AT FLOW SUB. 03:30 - 06:00 2.50 DRILL N DFAL 5,500.00 PROD1 UD BHA. PERFORM SLACK MANAGEMENT, PUMP ALL SLACK BACKWARDS. CONTINUOUS HOLE FILL AT 1.5 BPM. 06:00 - 08:00 2.00 DRILL N DFAL 5,500.00 PROD1 PUMP 136 FT OF WIRE OUT,IN CASE OF WET WIRE FROM KINKED PORTION. STILL LEAVES 1.75%EXCESS CABLE IN REEL. INSTALL BHI CABLE HEAD AND ELECTRIC TEST,GOOD. 08:00 - 09:00 1.00 DRILL N DFAL 5,500.00 PROD1 PRESSURE TEST CT CONNECTOR TO 300/ 3700 PSI,GOOD. PUMP SLACK FORWARD AT 2.5 BPM UNTIL IT QUITS MOVING,THEN CONTINUE TO PUMP 1 CT VOLUME FORWARD. _ 09:00 - 10:00 1.00 DRILL N DFAL 5,500.00 PROD1 M/U CT RISER TO WELL. PUMP 80 BBLS AT 2.5 BPM THEN SHUT IN SWAB. PT CT RISER SECTION ABOVE QTS TO 300/ 3500 PSI,GOOD. 10:00 - 11:00 1.00 DRILL N DFAL 5,500.00 PROD1 M/U BHA#15-2.80 WINDOW MILL AND STRING REAMER. 11:00 - 13:20 2.33 DRILL N DFAL 5,500.00 PROD1 M/U CT RISER AND TEST QTS TO 300/3500 PSI, GOOD. RIH. PUMP 1.4 BPM/1500 PSI THROUGH OPEN EDC. 13:20 - 14:25 1.08 DRILL N DEAL 5,500.00 PROD1 TIE-IN DEPTH FROM 8970 FT. CORRECT-1 FT. CONTINUE RIH. STOP 30 FT ABOVE WHIPSTOCK AND CLOSE EDC. 14:25 - 15:30 1.08 DRILL N DPRB 9,313.00 PROD1 REAM WINDOW FROM 3 FT ABOVE TOW TO BELOW BOW AT 20-30 FT/HR AT 110R TF. FIRST PASS DOWN AND UP SHOWS NO MOTOR WORK OR WEIGHT FLUCTUATIONS. 15:30 - 16:30 1.00 DRILL N DPRB 9,313.00 PROD1 MAKE 2ND PASS DOWN THEN UP AT 11 OR TF. NO MOTOR WORK SEEN. 16:30 - 17:45 1.25 DRILL N DPRB 9,313.00 PROD1 3RD PASS DOWN THEN UP. DRY DRIFT WINDOW WITH NO PROBLEMS. 17:45 - 19:30 1.75 DRILL N DPRB 9,313.00 PROD1 POOH WITH WINDOW MILL BHA RATE OF 1.70 BPM AT 2161 PSI. MONITOR WELL CONFIRM STILL ON VAC. 19:30 - 21:30 2.00 DRILL N DPRB 9,313.00 PROD1 R/B INJECTOR HEAD UD BHA MILL GAUGED AT 2.80"GO/2.79"NO GO LOOKS NEW. MAINTAIN CONTINUOUS HOLE FILL OF 1.5 BPM. M/U DRILLING BHA.BIT HYC SRRE3408M-B1 REBUILT. R/U INJECTOR HEAD. 21:30 - 22:00 0.50 DRILL N DPRB 9,313.00 PROD1 TEST QTS. TEST TO 250 PSI LOW AND 3500 PSI HIGH. GOOD TEST. MAINTAIN CONTINUOUS HOLE FILL OF 1.5 BPM. 22:00 - 00:00 2.00 DRILL N DPRB PROD1 RIH TO WINDOW WITH EDC OPEN. TIE IN.WITH A-3'CORRECTION. RIH THROUGH WINDOW WITH EDC OPEN.NO PROBLEMS.CLOSE EDC. Printed 11/14/2011 1:36:47PM North America -ALASKA - BP Page 15 of 19 Operation Summary Report Common Well Name: 14-28 1 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.:NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) 10/13/2011 00:00 - 01:30 1.50 DRILL P PROD1 RIH FROM WINDOW TO 11,300' RATE OF 1.5 BPM @ 2183 PSI. 01:30 - 02:30 1.00 DRILL P PROD1 DRILLING AHEAD AT ROP OF 54'TO 11350' RATE OF 1.50 BPM @ 2380 WELL HEAD PSI OF 18,IA OF 44 AND OA OF 164. DRILLING WITH WELL CLOSED AND FULL LOSSES.ECD OF 8.02 PPG AND 3671 PSI BHP. 02:30 - 03:15 0.75 DRILL P PROD1 WIPER TO 10690' PUMP 10 BBL HI-VIS SWEEP. 03:15 - 03:45 0.50 DRILL P PROD1 DRILLING AHEAD AT ROP OF 29'TO 11373' RATE OF 1.50 BPM @ 2219 WELL HEAD PSI OF 26, IA OF 44 AND OA OF 164. DRILLING WITH WELL CLOSED AND FULL LOSSES.ECD OF 8.04 PPG AND 3682 PSI BHP. WOB@2.1K DRILLED 73'OF HOLE AND CANNOT BUILD ANGLE. DECISION MADE TO POOH AND INCREASE AKO. 03:45 - 07:00 3.25 DRILL P PROD1 POOH FOR ADJUSTING MOTOR. 07:00 - 09:00 2.00 DRILL P PROD1 " STAND BACK INJECTOR AND REMOVE BHA FROM WELL. TURN MOTOR TO 1.0 DEG. M/U BHA#17 AND M/U CT RISER. 09:00 - 11:20 2.33 DRILL P PROD1 PRESSURE TEST QTS 700/3000 PSI,GOOD. RIH BHA#17. 11:20 - 12:00 0.67 DRILL P PROD1 TIE-IN DEPTH FROM 8880 FT. CORRECT DEPTH-3.5 FT. STOP AT WINDOW AND CLOSE EDC. 12:00 - 13:00 1.00 DRILL P PROD1 PASS THROUGH WINDOW WITH NO PUMP, NOTHING SEEN. INCREASE PUMP RATE TO 1.57 BPM/2400 PSI, RIH TO BOTTOM. 13:00 - 14:20 1.33 DRILL P PROD1 DRILL FROM 11374 FT. ECD=8.08 PPG. DRILL AT 1.57/0 BPM @ 2440 PSI. INITIAL ROP IS 50 FT/HR,GRADUALLY INCREASING TO 80 FT/HR. PUMP 10 BBL HI-VIS SWEEP AFTER 50 FT DRILLED. DRILL TO 11454 FT. 14:20 - 15:00 0.67 DRILL P PROD1 WIPER TRIP FROM 11454 FT TO 10690 FT. NO CHANGES IN ECD WHEN SWEEP COMES AROUND. CLEAN PASS UP AND DOWN. 15:00 - 16:20 1.33 DRILL P PROD1 DRILL FROM 11454 TO 11525 FT. PUMP HI-VIS SWEEP AROUND AT 11500 FT. 16:20 - 17:35 1.25 DRILL P PROD1 WIPER TRIP FROM 11525 FT TO 10690 FT. 17:35 - 20:15 2.67 DRILL P PROD1 DRILL FROM 11525'TO 11531' HOT TOOL WAS NOT RESPONDING PROPERLY. BEGIN POOH TO 11034'WHEN TOOL BEGAN WORKING. RIH AND CONTINUE DRILLING TO 11,600'. 20:15 - 23:00 2.75 DRILL P PROD1 WIPER TRIP TO WINDOW. RATE 1.6 BPM @ 2410 PSI. ECD OF 8.37 PPG WITH WELL HEAD PSI OF 3830 PSI. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 16 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 11,600'TO 11,650' RATE OF 1.6 BPM @ 1915 PSI.IA OF 48 AND OA OF 168 WOB OF 2.32K, ECD OF 8.55 PPG @ 3911 PSI BHP,WELL HEAD PSI OF 40. ROP OF 65. 10/14/2011 00:00 - 00:30 0.50 DRILL P PROD1 DRILL AHEAD FROM 11,650'TO 11656' HOT TOOL FAILED POOH. 00:30 - 03:45 3.25 DRILL N DFAL 11,656.00 PROD1 POOH - RATE OF 1.62 BPM @ 1403 PSI ECD AT 8.13 PPG WITH BHP AT 3720 PSI. POOH TO BHA.MONITOR WELL-LOSSING 03:45 - 04:30 0.75 DRILL N DFAL 11,656.00 PROD1 R/B INJECTOR. UD BHA. 04:30 - 08:30 4.00 DRILL P PROD1 CLOSE MASTER AND SWAB TO TEST. TEST MASTER TO 250 PSI LOW AND 3500 PSI HIGH-GOOD TEST TEST SWAB TO 250 PSI LOW AND 3500 PSI HIGH-GOOD TEST. FLUSH COIL WITH WATER CORROSION INHIBITOR AND METHANOL. 08:30 - 10:30 2.00 DRILL P PROD1 FINISH N2 PURGE,ALLOW PRESSURE TO BLEED OFF. PREP RIG FLOOR TO PULL CT ACROSS. LIFT INJECTOR OFF CT RISER AND REMOVE BHI CABLE HEAD AND CT CONNECTOR. 10:30 - 11:45 1.25 DRILL< P PROD1 INSTALL LONGER CABLE ON PULLBACK WINCH. INSTALL INTERNAL GRAPPLE ON CT. PULL TEST THEN START ROLLING CT UP ON THE SHIPPING DRUM. WHEN CT LEAVES THE GOOSENECK,THE RESIDUAL BEND OF THE PIPE PULLS THE CABLE TO THE SIDE AND OFF THE GOOSENECK ROLLERS. 11:45 - 12:15 0.50 DRILL P PROD1 PJSM THEN SEND SOMEONE UP ON THE GOOSENECK TO PUT THE CABLE BACK ON THE ROLLERS. 12:15 - 13:00 0.75 DRILL P PROD1 CONTINUE ROLLING CT BACK ONTO REEL. SECURE CT TO SHIPPING BAR. TEST CT CLAMP THEN SLACK OFF PULLBACK WINCH. CUT OFF EXCESS COIL AND ROLL REEL BACK TO WHERE IT CAN BE LOWERED TO THE TRUCK. WHILE SWAPPING REELS,OPEN BOPS AND INSPECT TO PREP FOR BOP TEST. 13:00 - 15:00 2.00 DRILL P PROD1 REMOVE 1502 LINE FROM INSIDE REEL. 15:00 - 19:30 4.50 DRILL P PROD1 ATTACH SLINGS AND SHACKLES TO REEL. LIFT UP TO TAKE WEIGHT OFF REEL PINS AND TRY TO REMOVE THEM FROM THE REEL FLANGE, NOT ABLE TO EASILY. WORKED REEL FLANGE FREE AND REPLACE REEL. BEGIN RIGGING UP AND SECURING REEL. 19:30 - 20:00 0.50 DRILL P PROD1 R/U TO TEST BOPES. Printed 11/14/2011 1:36:47 P M North America -ALASKA- BP Page 17 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/27/2011 End Date: X3-010QL-C:(3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 DRILL P PROD1 TEST BOPE,RAMS,CHOKE MANIFOLD VALVES,HCR KILL,HCR CHOKE, KILL VALVE, MAN 3"VALVE.2-FLOOR VALVES,ANNULAR TO 250/3500 PSI 5 MIN EACH. PERFORM ACCUMULATOR DRAW DOWN • TEST. AOGCC REP CHUCK SHEVE WAIVED WITNESS OF BOPE TEST. TEST WITNESSED BY BP WSL JOHN WILLOUGHBY AND NORDIC TOUR PUSHER DAVE HILER. 10/15/2011 00:00 - 01:30 1.50 DRILL P PROD1 FINISH TESTING BOPE, RAMS,CHOKE MANIFOLD VALVES,HCR KILL, HCR CHOKE, KILL VALVE, MAN 3"VALVE.2-FLOOR VALVES,ANNULAR TO 250/3500 PSI 5 MIN EACH. PERFORM ACCUMULATOR DRAW DOWN TEST. AOGCC REP CHUCK SHEVE WAIVED WITNESS OF BOPE TEST. TEST WITNESSED BY BP WSL JOHN WILLOUGHBY AND NORDIC TOUR PUSHER DAVE HILER. 01:30 - 08:00 6.50 DRILL P PROD1 INSTALL GRAPPLE. PULL COIL TO INJECTOR HEAD. TEST E-LINE 55 OHM>2000 MEG BOOT E-LINE. 08:00 - 08:30 0.50 DRILL P PROD1 PUMP SLACK BACKWARDS,CABLE IS HEARD MOVING. 08:30 - 10:00 1.50 DRILL P PROD1 RIG UP HYDRAULIC CT CUTTER,CUT OFF 260 FT OF CT TO GIVE 1.7%EXCESS CABLE IN REEL. INSTALL CT CONNECTOR,PULL TEST TO 35K, GOOD. PUMP 20 FT OF CABLE OUT TO INSTALL CABLE HEAD. 10:00 - 12:30 2.50 DRILL P PROD1 INSTALL CABLE HEAD, PRESSURE TEST CT CONNECTOR, GOOD. PRESSURE TEST BHI CHECK VALVES,GOOD. 12:30 - 13:30 1.00 DRILL P PROD1 M/U CT RISER TO WELL. PRESSURE TEST RISER SECTION AGAINST CLOSED SWAB VALVE. GOOD TEST. STAY ON WELL AND PUMP SLACK FORWARD,1 CT VOLUME AT 1.7 BPM. 13:30 - 14:25 0.92 DRILL P PROD1 PJSM THEN MOVE INJECTOR TO CIRC HOLE. OPEN SWAB AND MASTER VALVE. WELL HAS 7 PSI WHP. PUMP 200 BBL DOWN THE WELL AT 4.5 BPM. 14:25 - 14:50 0.42 DRILL P PROD1 REDUCE RATE TO 1.5 BPM AND MONITOR FOR 30 MIN. WELL IS TAKING FLUID,ON STEADY VAC. 14:50 - 15:40 0.83 DRILL P PROD1 M/U BHA#18-HYC BI-CENTER BIT,1.0 DEG MOTOR,2-3/8"COILTRAK WITH RES. BHA OAL=68.05 FT. 15:40 - 16:30 0.83 DRILL P PROD1 RIH BHA#18. PUMP 1.6 BPM THROUGH OPEN EDC. 16:30 - 16:50 0.33 DRILL P PROD1 COMS FAILURE WITH TOOL, POOH. Printed 11/14/2011 1:36:47PM • North America -ALASKA- BP Page 18 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:50 - 18:15 1.42 DRILL P PROD1 TAG STRIPPER,TROUBLESHOOT TOOL. E-LINE BECAME UNPLUG R/U AND PUMP SLACK FORWARD AT 3.0 BPM FOR VOLUME AND HALF OF COIL. 18:15 - 19:00 0.75 DRILL P PROD1 M/U BHA PRESSURE TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH.GOOD TEST MAINTAIN CONTINUOUS HOLE FILL OF 1.72 BPM 19:00 - 22:45 3.75 DRILL P PROD1 RIH PUMP RATE OF 2.0 BPM WITH EDC OPEN AND 1959 PSI. TIE IN LOG AT 8800'MINUS 3 FOOT CORRECTION. TAG UP AT 11662' 22:45 - 00:00 1.25 DRILL P PROD1 DRILLING AHEAD FROM 11662' ECD=8.07 @ 3695 PSI RATE OF 1.57 BPM @ 1520 PSI. INITIAL ROP IS 40 FT/HR,GRADUALLY INCREASING TO 60 FT/HR. • PUMP 10 BBL HI-VIS SWEEP AFTER 50 FT DRILLED. FAULT SEEN AT 11675' DRILL TO 11688'FT. 10/16/2011 00:00 - 00:45 0.75 DRILL P PROD1 DRILLING AHEAD FROM 11688' ECD=8.07 @ 3695 PSI RATE OF 1.57 BPM @ 1520 PSI. INITIAL ROP IS 40 FT/HR PUMP 10 BBL HI-VIS SWEEP AFTER 50 FT DRILLED. DRILL TO 11725'FT. 00:45 - 02:15 1.50 DRILL P PROD1 WIPER TRIP TO 10690'. RATE 1.6 BPM @ 1586 PSI. ECD OF 7.97 PPG AT 3650 PSI BHP. MAINTAIN CONTINUOUS HOLE FILL OF 1.6 BPM. 02:15 - 05:00 2.75 DRILL P PROD1 DRILLING AHEAD FROM 11725' ECD=8.14 @ 3728 PSI RATE OF 1.57 BPM @ 1794 PSI. INITIAL ROP IS 46 FT/HR PUMP 10 BBL HI-VIS SWEEP AFTER 50 FT DRILLED. DRILL TO 11800'FT. 05:00 - 06:30 1.50 DRILL P PROD1 WIPER TRIP. RATE 1.6 BPM @1714 PSI. ECD OF 8.02 PPG AT 3670 PSI BHP. MAINTAIN CONTINUOUS HOLE FILL OF 1.6 BPM. 06:30 - 09:45 3.25 DRILL P PROD1 BEHIND ON FLUIDS. PULL UP ABOVE PILOT HOLE AND REDUCE CIRC RATE TO 1.0 BPM UNTIL CAUGHT UP ON FLUIDS. PULL TO WINDOW AND OPEN EDC. PULL THROUGH WINDOW AT 110L WITH NO ISSUES. 09:45 - 11:00 1.25 DRILL P PROD1 FLUID ON LOCATION IS NOW SUFFICIENT FOR DRILLING. RIH AND CLOSE EDC, RIH TO BOTTOM. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 19 of 19 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/27/2011 End Date: X3-010QL-C: (3,100,427.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 14:00 3.00 DRILL P PROD1 DRILL FROM 11825 FT. ROP IS 20-30 FT/HR INITIALLY. DRILL TO 11865,PICK UP FOR ORIENTER ISSUES. PUMP 10 BBLS VISCOUS SWEEP. DRILL TO 11900 FT. 14:00 - 15:10 1.17 DRILL P PROD1 WIPER TRIP FROM 11900 FT TO JUST ABOVE THE LOSS ZONE. CLEAN PASS UP AND DOWN. 15:10 - 17:30 2.33 DRILL P PROD1 DRILL FROM 11900 FT. ECD IS 8.28 PPG,WELL IS STILL SHUT IN. 1.62/0 BPM 2 1900-2200 PSI. ROP IS AROUND 100 FT/HR PAST 11930 FT. 17:30 20:00 2.50 DRILL P PROD1 WIPER TO 10690' RATE OF 1.71 BPM @ 1754 PSI RIH-TO 11,972 AND TAGGED UP WASHED DOWN TO 11,980' P/U WITH 13K OVER PULL AND RIH TO 11972' TAG UP. P/U DISCUSS WITH GEO ON TD. DECISION MADE TO CALL TD. 20:00 - 00:00 4.00 DRILL P PROD1 POOH TO WINDOW AND TIE IN AT 8880' RATE OF 1.56 BPM AND 1520 PSI. ECD OF 8.02 WITH BHP OF 3673 PSI. TIE IN AT+4'CORRECTION. • RIH AND TAG BOW ATTEMPT 6 TIMES TOTAL LAST TIME WENT THROUGH WINDOW AT 70R. Printed 11/14/2011 1:36:47PM North America -ALASKA- BP Page 1 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release. Rig Contractor: NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/17/2011 00:00 - 00:30 0.50 CONDHL P RUNPRD RIH AND TAG AT 11974'4 TIMES. 00:30 - 05:00 4.50 CONDHL P RUNPRD PUMP 50 BBL HI-VIS MUD AS LINER PILL AND POOH. 1.52 @ 1527 PSI. 8.18 ECD @ 3745 BHP. PAINT FLAGS AT 200'ABOVE TD FOR LINER AT 8958',AND 200'ABOVE TOP OF WINDOW WITH LINER AT 6654' MONITOR WELL-ON A VAC. 05:00 - 07:00 2.00 RIGU P RUNPRD RACK BACK INJECTOR. L/D BHA. 07:00 - 10:00 3.00 RIGU P RUNPRD PUMP SLACK OUT,A TOTAL OF 240 FT. LEAVES 0%EXCESS ACCORDING TO TRACKING SHEET. INSTALL BOT CT CONNECTOR, PULL TEST PRESSURE TEST,GOOD. PUMP A 3/4"BALL AROUND AND RECOVER IT. 10:00 - 13:00 3.00 RIGU N WAIT RUNPRD RIG IS PLACED ON STANDBY BY ANC WELLS MANAGEMENT, DUE TO AN INCIDENT ON NORDIC 1. CONTINUE TO INJECT 1.5 BPM INTO THE WELL WHILE WAITING,CIRC 0.3 BPM THROUGH THE CT. 13:00 - 14:30 1.50 RIGU P RUNPRD RIG IS CLEAR TO PROCEED WITH WELL OPS. PREP RIG FLOOR FOR RUNNING LINER. 14:30 - 19:00 4.50 RPRIN P RUNPRD M/U LINER AS PER LINER SUMMARY. AFTER 6 JTS RAN HOLD AN UNANNOUNCED KICK WHILE TRIPPING DRILL. CREW RESPONDS WELL,CONDUCT AAR THEN CONTINUE M/U LINER. 19:00 - 20:00 1.00 RPRIN P RUNPRD HOLD UN ANNOUNCED KICK WHILE TRIPPING DRILL WITH THE COMPLEXITY OF A FAILED KUMMY HYD.LINE. THE RIG CREW RESPONDED WELL AND THE MOTOR MAN REACTED BY NEUTRALIZING THE LEAK.THIS WAS A SUCCESSFUL DRILL. THE AAR WAS HELD AND IT WAS DISCUSSED ABOUT OTHER POTENTIAL RESPONSES. DURING THIS AAR IT WAS VERY APPARENT THAT THE CREW WAS THINKING. 20:00 - 00:00 4.00 RPRIN P RUNPRD CONTINUE TO RIH WITH 2-3/8"4.4#L-80 STL LINER AS PER LINER SUMMARY. DRIFT EVERY CONNECTION. 10/18/2011 00:00 - 01:30 1.50 RPRIN P RUNPRD CONTINUE TO RIH WITH 2-3/8"4.4#L-80 STL LINER AS PER LINER SUMMARY. DRIFT EVERY CONNECTION.CONFIRM 24 JOINTS LEFT IN PIPE SHED. P/U RUNNING TOOLS M/U INJECTOR HEAD. TEST QTS TO 250 PSI LOW AND 3500 PSI HIGH.GOOD TEST 01:30 - 04:00 2.50 RPRIN P RUNPRD PJSM ON RIH WITH LINER CONFER WITH HANDS ON BHA LENGTH OF 2833.66' RIH TO 1ST FLAG AT 9426' Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page 2 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:30 0.50 RPRIN P RUNPRD RUN NUMBER ON FLAGS AND—1 FOOT DIFFERENCE NO CORRECTION MADE TO DEPTH CONTROL. 04:30 - 05:45 1.25 RPRIN P RUNPRD CONTINUE TO RIH WITH LINER. CLEAR WINDOW WITH A SLIGHT WEIGHT BOBBLE RIGHT ON DEPTH. RIH CLEAN TO 11673' 05:45 - 08:40 2.92 RPRIN P RUNPRD WORK PIPE AT 11673'. P/U WT OF 40K AND SLACK OFF WT OF 18K CONTINUE TO WORK PIPE CHANGING RUNNING SPEED AND PUMP RATES. PUMP 20 BBLS VISCOUS SWEEP AROUND. CHANGE ANNULAR AND CT PUMP RATES, - TRY VARIOUS RUNNING SPEEDS. NOT ABLE TO PASS 11673 FT. 08:40 - 10:15 1.58 RPRIN N DPRB RUNPRD PJSM FOR POOH WITH LINER. DISCUSS WELL CONTROL AND PUMP STRATEGY. PUMP 1.0 BPM/440 PSI DOWN THE CT AND 1.1 BPM/130 PSI WHP DOWN THE CT X TBG ANNULUS WHILE POOH. LIMIT PULLING SPEED TO 30 FT/MIN WHILE IN OPEN HOLE. 10:15 - 10:45 0.50 RPRIN N DPRB RUNPRD .PARK ABOVE PILOT HOLE FOR 30 MIN AND MAINTAIN SAME PUMP RATES,WATCH WELL. 1.15/84 PSI DOWN ANNULUS,1.05/460 PSI DOWN CT. 10:45 - 12:15 1.50 RPRIN N DPRB RUNPRD WELL IS STABLE,POOH. 12:15 - 12:45 0.50 RPRIN N DPRB RUNPRD TAG STRIPPER. PUMP 0 DOWN THE CT AND 1.6 BPM/-30 PSI DOWN THE CT X TBG ANNULUS. MONITOR WELL FOR 30 MIN. WELL IS ON STABLE VAC. 12:45 - 16:00 3.25 RPRIN N DPRB RUNPRD LIFT OFF INJECTOR AND SET IT ON LEGS. LID 4 JTS OF 2.06 CSH. STAND BACK 42 STANDS LINER,L/D 2 X 10 FT PUPS,THEN STAND BACK ONE MORE STAND. 16:00 - 17:00 1.00 CONDHL N DPRB RUNPRD CLEAR RIG FLOOR.PREP TO PUMP SLACK BACKWARDS. OFFLOAD SELBRT TOOL BACK TO BOT DEADHORSE FOR REDRESS. 17:00 - 19:00 2.00 CONDHL N DPRB RUNPRD M/U CT RISER TO WELL AND PUMP SLACK BACKWARDS. RIG UP HYDRAULIC CUTTER AND CUT 260 FT OF CT OFF. 19:00 - 21:30 2.50 CONDHL N DPRB RUNPRD PJSM, M/U SLB CTC.PULL TEST TO 34K.PT TO 4000 PSI. M/U BHI E-HEAD.PT TO 400/4000 PSI 5 MIN EACH. MONITOR WELL-CONTINUE PUMPING 1.6 BPM DOWN KILL LINE KEEPING FLUID TO WELLBORE. M/U AND TEST BHI CHECKS TO 250/3500 PSI 5 MIN EACH. Printed 11/14/2011 1.37:16PM North America -ALASKA- BP Page 3 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project: Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 23:00 1.50 CONDHL N DPRB RUNPRD PJSM,CLOSE SWAB VALVE. M/U INJECTOR.PUMP SLACK FOWARD. TEST LUBRICATOR CONNECTIONS TO 250/ 3500 PSI 5 MIN EACH. OPEN SWAB VALVE,MONITOR WELL FOR 15 MIN. WELL ON STABLE VAC. SET BACK INJECTOR. CONTINUE FILLING 1.6 BPM DOWN KILL LINE. 23:00 - 00:00 1.00 CONDHL N DPRB RUNPRD PJSM,M/U BHA#21,3"BI-CENTER BIT,2 3/8" XTREME MOTOR WITH 1 DEG AKO, • HOT, DGS,DPS, EDC,PC,WS,LOC,UQC, CTC. M/U INJECTOR.TEST QTS TO 250/3500 PSI 5 MIN EACH. 10/19/2011 00:00 - 03:00 3.00 CONDHL N DPRB RUNPRD OPEN EDC,RIH WITH BHA#21 PUMPING 1.87 BPM. 1650 PSI. TIE IN LOG AT 8820'-3'CORRECTION. 03:00 - 03:30 0.50 CONDHL N DPRB RUNPRD ATTEMPT TO PASS THROUGH WINDOW AT 9674' AT 90R,70R AND 11 OR AT 25-30 FPM. CLOSE EDC. PUMP.37 BPM. ATTEMPT TO PASS THROUGH WINDOW AT 90R,50R,70R. WITH PUMP OFF RIH 25 FPM STOPPING WHEN TAKING WT- PASS THROUGH WINDOW. 03:30 - 04:45 1.25 CONDHL N DPRB RUNPRD RIH 30 FPM.PUMPING 1.64 BPM 1520 PSI WITH AS DRILLED TOOL FACE. TAG AT 11674' 04:45 - 05:15 0.50 CONDHL N DPRB RUNPRD WORK THROUGH TIGHT SPOT AT 11674'AND 11740' 100 PSI MOTOR WORK TAG CORRECTED TD @ 11975' 05:15 - 08:00 2.75 CONDHL N DPRB RUNPRD PUMP 20 BBL HIGH VIS SWEEP AT 1.62 BPM PVT=346 BBLS,IA=59 PSI,OA=171 PSI. 08:00 - 09:10 1.17 CONDHL N DPRB RUNPRD CONTINUE WORKING THE OPEN HOLE SECTION. MAKE A TOTAL OF 9 PASSES THROUGH THE FAULT ZONE 11650-11750 FT. NOTHING SEEN ON LAST 2 PASSES. TAG BOTTOM AT 11974 FT. 09:10 - 10:45 1.58 CONDHL N DPRB RUNPRD LAST UP PASS,HOLE IS CLEAN. 10:45 - 12:20 1.58 CONDHL N DPRB RUNPRD LOG TIE-IN FROM 9700 FT DOWN. LOG AT 200 FT/HR, REDUCE PUMP RATE TO 1.1 BPM. CORRECT+3 FT. RIH TO BOTTOM. 12:20 - 12:40 0.33 CONDHL N DPRB RUNPRD SEE 3-4K WT FLUCTUATION AT 11674 AND AGAIN AT 11734 FT,PICK UP THROUGH HERE AGAIN. NOTHING SEEN NEXT TIME THROUGH. TAG BOTTOM AT 11977 FT,OFFICIAL TD. Printed 11/14/2011 1:37:16PM Page a of 14 North America -ALASKA- BP' Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:40 - 17:50 5.17 CONDHL N DPRB RUNPRD POOH. REDUCE RATE TO 0.5 BPM AND PULL THROUGH WINDOW. STOP AT 9650 FT AND OPEN EDC. PAINT ORANGE FLAG @ 9058.47'=9000'EOP IN UP STROKE. PAINT WHITE W/BLUE AND YELLOW FLAG @ 6758.47=6700 EOP IN UP STROKE. TAG STRIPPER. 17:50 - 18:00 0.17 CONDHL N DPRB RUNPRD FLOW CHECK FOR 10 MIN.WELL ON STABLE VAC. 18:00 - 18:20 0.33 CONDHL N DPRB RUNPRD PJSM, L/D BHA#21,3"BI-CENTER BIT,2 3/8" XTREME MOTOR WITH 1 DEG AKO, HOT,DGS, DPS, EDC, PC,WS, LQC,UQC, CTC. BITGRADE=1 /1 /N/A/X/I/NO/TD 18:20 - 19:10 0.83 CONDHL N DPRB RUNPRD C/O 0-RINGS ON QTS,PERFORM SHELL TEST- TO 250/3500 PSI FOR 5 MIN EACH. 19:10 - 22:05 2.92 EVAL N DPRB RUNPRD PJSM, REMOVE SLB CTC. R/U AND PUMP 235'OFSLACK FORWARD. 18'SHY OF THE EXPECTED VALUE OF 250' OF E-LINE. DRESS COIL AND M/U BOT CTC. PULL TEST CTC TO 35K, PT TO 3500 PSI. PUMP AND DRIFT COIL WITH 3/4"BALL. LAUNCH WITH 1200 PSI. 33 BBLS OVER GOOSENECK, PUMP COIL VOLUME 39.5 BBLS. RECOVER 3/4 BALL. WELL ON STABLE VAC.CONTINUE FILLING FROM KILL LINE AT 1.6 BPM. 22:05 - 00:00 1.92 CASING N DPRB RUNPRD SET BACK INJECTOR. • DETAILED PJSM FOR RUNNING LINER. R/U 1.875"DRIFT R/U AND RUN 2 3/8 COMPLETION AS PER PROGRAM. VERIFY POWER TONG TORQUE. M/U SHOE TRACK ASSY,MECHANICAL INDEX TOOL WITH 1 DEG BENT SUB. RIH WITH 2 3/8"STL LINER FROM DERRICK. TORQUE TO 600 FT LBS. DRIFT CONNECTIONS. 10/20/2011 00:00 - 03:50 3.83 CASING N DPRB RUNPRD RIH WITH 2 3/8 COMPLETION FROM DERRICK. TORQUE TO 600 FT LBS. DRIFT CONNECTIONS. FILL LINER AT 42 JTS.RUN 86 JTS TOTAL, M/U RUNNING TOOLS, SELBRT,XO, HI-LOAD DC,XO, 4 JTS 2 1/16"CSH,QC, CTC. M/U INJECTOR. 03:50 - 04:05 0.25 CASING N DPRB RUNPRD TEST QTS TO 250/3500 PSI 5 MIN EACH. 04:05 - 06:30 2.42 CASING N DPRB RUNPRD SET PUMP TRIP AT 500 PSI. RIH WITH LINER 100 FPM, PUMPING 1.2 BPM DOWN BACKSIDE, .2 BPM DOWN COIL.EOP FLAG @ 6700'-2' CORRECTED TO 9541.1' P/U WT 38K. RIH 30 FPM PASSING THROUGH WINDOW AT 9968' CLEAN. Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page 5 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site: PB DS 14 • Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 09:30 3.00 CASING N DPRB RUNPRD SET DOWN AT 11674 FT,HARD TAG. PICK UP TO ACTIVATE INDEXING TOOL. SET DOWN IN SAME SPOT A TOTAL OF 15 TIMES,CAN'T PASS. TRY VARIOUS PUMP RATES AND RUNNING SPEEDS. PUMP 15 BBLS VISCOUS SWEEP. •WHEN SWEEP IS COMING OUT TRY ANOTHER 4 TIMES TO PASS,NO LUCK. 09:30 - 11:10 1.67 CASING N DPRB RUNPRD PJSM FOR PULLING OUT OF HOLE. DISCUSS SWAB POTENTIAL WHEN PULLING LINER. PUMP 1 BPM DOWN,BOTH THE CT AND THE CTX TBG ANNULUS WHILE PULLING OUT, LIMIT TRIP SPEED TO 30 FT/MIN UNTIL ABOVE PILOT HOLE. 11:10 - 11:40 0.50 CASING N DPRB RUNPRD 30 MIN CHECK ABOVE PILOT HOLE TO ENSURE STABLE WELL CONDITIONS. 11:40 - 13:00 1.33 CASING N DPRB RUNPRD POOH. CONTINUE PUMPING 1 BPM BOWN BOTH THE CT AND THE CT X TBG ANNULUS. 13:00 - 13:30 0.50 CASING N DPRB RUNPRD TAG STRIPPER. PUMP 1.5 BPM DOWN CT X TBG ANNULUS,OBSERVE WELL ON STABLE VAC. 13:30 - 16:00 2.50 CASING N DPRB RUNPRD L/D 4 JTS 2.06 CSH. STAND BACK 2-3/8"LINER IN DERRICK. 16:00 - 19:00 3.00 CASING N DPRB RUNPRD BRING INDEXING TOOL TO SURFACE AND TEST IT OUT. TOOL IS WORKING FINE. OFFLOAD SELBRT AND SEND TO DEADHORSE FOR REDRESS. WAIT ON 2 DEG BENT SUB COMING FROM KCS. 19:00 - 20:00 1.00 CASING N DPRB RUNPRD M/U BIAS EDGE SHOE,2 3/8"PUP,2 DEG BENT SUB,2 3/8"PUP,MECHANICAL INDEX TOOL. TACK WELD TURBOLIZER TO PUP JT. 20:00 - 20:20 0.33 CASING N DPRB RUNPRD PJSM FOR M/U 2 3/8"LINER ASSY. DISCUSS NON SHEARABLES ACROSS BOPE. HOLE FILLING FROM BACKSIDE WHILE RUNNING LINER. 20:20 - 00:00 3.67 CASING N DPRB RUNPRD M/U 2 3/8 LINER JEWELRY. RIH WITH 2 3/8 COMPLETION FROM DERRICK. TORQUE TO 600 FT LBS. DRIFT CONNECTIONS. FILL LINER AT 41 JTS. RUN 85 JTS TOTAL. 10/21/2011 00:00 - 01:30 1.50 CASING N DPRB RUNPRD M/U RUNNING TOOLS, SELBRT,XO, HI-LOAD DC,XO, 4 JTS 2 1/16"CSH,QC, CTC. M/U INJECTOR. 01:30 - 01:55 0.42 CASING N DPRB RUNPRD TEST QTS TO 250/3500 PSI 5 MIN EACH. 01:55 - 04:45 2.83 CASING N DPRB RUNPRD SET PUMP TRIP AT 500 PSI. RIH WITH LINER,PUMPING 1.2 BPM DOWN BACKSIDE, .4 BPM DOWN COIL.EOP FLAG @ 6700'-3.5' CORRECTED DEPTH TO 9513' 9650'S/O WT 20K,P/U 35K PASS THROUGH WINDOW 30 FPM @ 9668' CLEAN. TAG AT 11674' Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page 6 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 LEnd Date: !X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:45 - 06:00 1.25 CASING N DPRB RUNPRD INCREASE PUMP TO 1 BPM. SET DOWN 12 TIMES CYCLING INDEX TOOL 30 DEG EACH TIME. REDUCE PUMP TO MIN RATE.CONTINUE TO SET DOWN. SET DOWN 15 TIMES WITH NO SUCCESS. INCREASE RATE DOWN BACKSIDE TO 2.44 BPM,WHP 780 PSI. CONTINUE TO SET DOWN AND CYCLE INDEXING TOOL 3 MORE TIMES. DECISION IS MADE TO CEMENT THE LINER AT A DEPTH OF 11674 FT. 06:00 - 06:20 0.33 CASING P RUNPRD. RECORD PICKUP WEIGHTS AND BREAKOVER. BREAKOVER WEIGHT OF 42K RECORDED AT 11663 FT. 06:20 - 07:40 1.33 CASING P RUNPRD DROP 5/8"STEEL BALL. LAUNCH WITH 1200 PSI. BALL IS HEARD ROLLING,CHASE IT AT 1.5 BPM. MOVE CT BACK TO 11674 FT,10K DOWN. SLOW PUMP TO 0.3 BPM AFTER BALL LEAVES THE REEL HOUSE START PUMPING DOWN CTX TBG ANNULUS AT 1.0 BPM. AFTER 41 BBLS PUMPED, NO EVIDENCE OF BALL SEATING. REEL VOLUME IS 36 BBLS. 07:40 - 08:20 0.67 CASING P RUNPRD CYCLE CT PUMP UP AND DOWN. NO LUCK. MOVE CT UP CLOSE TO BREAKOVER POINT AND CYCLE PUMP AGAIN. REPEAT,NOT ON SEAT. MOVE CT BACK DOWN AND SURGE WITH 1500 PSI SURFACE PRESSURE. REPEAT 2 MORE TIMES WITH 35K HANGING WT. BALL IS ON SEAT. 08:20 - 09:00 0.67 CASING P RUNPRD RUN BACK DOWN TO 10K WT AND PRESSURE UP TO SHEAR OUT BALL SEAT. SHEAR OUT AT 2300 PSI. PICK UP TO NEW BREAKOVER WEIGHT OF 29K AT 11668 FT. REPEAT,SAME RESULTS. GET BACK TO 10K DOWN WEIGHT AND CIRC AT 1.5 BPM DOWN CT,0 DOWN CT X TBG ANNULUS. OPEN RETURN SIDE CHOKE FOR CEMENT JOB,WELL ON VAC. _ 09:00 - 10:00 1.00 CASING P RUNPRD RIG UP SLB CEMENTERS. 10:00 - 10:30 0.50 CASING P RUNPRD PJSM FOR PUMPING CEMENT WITH SLB CEMENTERS AND RIG CREW. 10:30 - 11:00 0.50 CASING P RUNPRD BRING FLUID ON BOARD RIG. 11:00 - 11:40 0.67 CASING P RUNPRD SHUT IN CT AND PUMP KCL WATER TO CEMENT VAN FOR PT AND PRIME LINES. PT CEMENT LINE TO 4500 PSI,GOOD. 11:40 - 12:20 0.67 CASING P RUNPRD START BATCHING UP CEMENT. Printed 11/14/2011 137 16PM North America -ALASKA- BP Page 7 of 14 Operation Summary Report Common Well Name. 14-28 AFE No Event Type COM-ONSHORE (CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194 00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:20 - 12:40 0.33 CASING P RUNPRD CEMENT UP TO WEIGHT. PUMP 3 BBLS BIOZAN TO GET BIO TO THE REEL AND SHUT DOWN. SLB CEMENT VAN PUMPS 11.1 BBLS CEMENT. SHUT DOWN SLB CEMENT UNIT PUMP AND CLEAN UP LINE. USE RIG PUMP TO DISPLACE CEMENT. 12:40 - 13:20 0.67 CASING P RUNPRD START DISPLACEMENT WITH RIG PUMPS. SLOW TO 0.8 BPM WHEN LEADING EDGE OF CEMENT IS AT LWP. WITH 2 BBLS CEMENT LEFT ABOVE SELBRT, SHUT DONW PUMP AND PICK UP BREAKOVER WEIGHT+14 FT. SIDE EXHAUST 2 BBLS CEMENT+3 BBLS BIOZAN.OPEN BAKER CHOKE,RIH TO 10K DOWN,SAME DEPTH AS BEFORE. 13:20 - 14:00 0.67 CASING P RUNPRD CLOSE CHOKE AND LAUNCH LWP AT 2400 PSI. BUMPS AT 10.3 BBLS,VS 10.4 BBLS CALCULATED. BUMP AT 500 PSI OVER CIRC PRESSURE AND HOLD,HOLDING GOOD. OPEN BAKER CHOKE,FLOATS HOLDING. PRESSURE UP TO 500 PSI AND UNSTING, CIRC 2 BBLS AT LINER TOP. CIP @ 13:45 HRS,TOL=8989'SET @ 11674' SELBRT TOOL APPEARED TO FUNCTION NORMALLY,HOWEVER THERE WERE NO RETURNS THROUGHOUT THE JOB. 14:00 - 16:00 2.00 CASING P RUNPRD POOH. PUMP 1.5 BPM WITH NO RETURNS. ATA DEPTH OF 7100 FT GET SOME RETURNS BACK. STOP POOH AND FLOW CHECK THE WELL, NO FLOW. CONTINUE POOH,RETURNS SLOWLY IMPROVE TO ABOUT 0.5 BPM LOSS RATE AT 3000 FT. 16:00 - 16:20 0.33 CASING P RUNPRD TAG STRIPPER. 10 MIN FLOW CHECK IS NEGATIVE. TAKES 7 BBLS TO FILL WELL AFTER 10 MIN. 16:20 - 18:00 1.67 CASING P RUNPRD PJSM, L/D RUNNING TOOLS AND LOAD OUT. 18:00 - 19:40 1.67 BOPSUR P OTHCMP PJSM,PERFORM BOPE FUNTION TEST. FUNTION TEST BOPE FROM REMOTE IN OPS CAB, RIG FLOOR AND AT ACCUMULATOR. 19:40 - 00:00 4.33 CONDHL P OTHCMP PJSM FOR P/U CLEANOUT STRING. R/U,M/U BHA#24,1.75"MILL,1 11/16" EXTREME MOTOR,CIRC SUB,5/8"DC,XO, 92 JTS 1"CSH. DRIFT CSH,CIRCULATE AND FLUSH WORK STRING EVERY 30 JOINTS TO ENSURE NO PLUGGING. FILL BACKSIDE PUMPING 1 BPM. UCA TEST RESULTS CEMENT REACHED 500PSI COMPRESSIVE STRENGHT IN 5 HRS 18 MIN. 10/22/2011 00:00 - 00:20 0.33 CONDHL P OTHCMP M/U XO,2 JTS 2 1/16"CSH,XO,QC,CTC. M/U INJECTOR. 00:20 - 00:40 0.33 CONDHL P OTHCMP TEST QTS TO 250/3500 PSI 5 MIN EACH. Printed 11/14/2011 1 37 16P North America -ALASKA- BP Page 8 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C:(1,390,194.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:40 - 02:00 1.33 CONDHL P OTHCMP RIH WITH BHA#24 PUMPING DOWN COIL.4 BPM 600 PSI. PUMPING DOWN BACKSIDE 1 BPM WITH. 5 BPM RETURNS. WELL TAKING.9 BPM. P/U WT @ 8950'25K.S/O 15K. 02:00 - 03:35 1.58 CONDHL P OTHCMP INCREASE PUMP RATE TO 1.2 BPM 2800 PSI. ENTER TOL AT 8989'RIH 30 FPM. TAG PBTD @ 11649.5'.NO MOTOR WORK. UCA TEST RESULTS CEMENT REACHED 2000PS1 COMPRESSIVE STRENGHT IN 12 HRS 59 MIN. PVT=218.I/A=54 PSI.O/A=167 PSI 03:35 - 05:30 1.92 CONDHL P OTHCMP POH 30 FPM PUMPING 1.2 BPM 2850 PSI.TO TOL @ 8989 POH. 05:30 - 09:30 4.00 CONDHL P OTHCMP STAND BACK CSH IN DERRICK IN DOUBLES. 09:30 - 11:00 1.50 CONDHL P OTHCMP BRING SCMT TOOL TO RIG FLOOR. CLEAR RIG FLOOR AND PREP TO RUN SCMT/GR/CCL LOGGING TOOLS. 11:00 - 14:30 3.50 CONDHL P OTHCMP START M/U BHA#25-SCMT/GR/CCL LOGGING TOOL WITH 1"CSH. CHECK MIDDLE CONNECTION ON EVERY STAND CSH. 14:30 - 15:40 1.17 CONDHL - P OTHCMP M/U 2 JTS 2.06 CSH AND CT RISER. INSTALL DEPTH ENCODER AND CABLE FOR SLB MEMORY LOGGER. 15:40 - 18:00 2.33 CONDHL P OTHCMP RIH BHA#25. PUMP 1 BPM ACROSS KILL LINE,0.5 BPM DOWN CT. GETTING 0.55 BPM RETURNS. SLOW DOWN GOING PAST ALL RESTRICTIONS AND JEWELRY. RIH PAST TOL @ 8989' 18:00 - 19:50 1.83 CONDHL P OTHCMP RIH 30 FPM,AT 9643'CORRECT @ 6700'FLAG -5'CORRECTION. P/U WT.26K. RIH TO 11630' 19:50 - 00:00 4.17 EVAL P OTHCMP LOG UP 30 FPM, PUMPING.5 BPM DOWN COIL 450 PSI. PUMPING 1 BPM DOWN BACKSIDE. WITH.37 BPM OUT MM TO 8700' RIH TO 11,630'30 FPM.LOG UP SECOND PASS 30 FPM LAYING IN 20 BBLS 120 LSRV 8.6 PPG PERF PILL. PAINT FLAG AT 11543'FOR 8600'EOP. 10/23/2011 00:00 - 01:40 1.67 EVAL P OTHCMP CONTINUE LOGGING UP 30 FPM TO 8700' PUMPING DOWN BACKSIDE 1.16 BPM. PUMPING DOWN COIL.25 BPM 290 PSI. 01:40 - 02:50 1.17 EVAL P OTHCMP POH PUMPING DOWN BACKSIDE 1.1 BPM. PUMPING DOWN COIL.68 BPM 700 PSI. TAG STIPPER. 02:50 - 03:10 0.33 EVAL P OTHCMP FLOW CHECK WELL CONTINUES ON STEADY VAC TAKING.9 BPM. HOLD PJSM FOR STANDING BACK CSH. 03:10 - 05:20 2.17 EVAL P OTHCMP SET BACK INJECTOR. STAND BACK CSH IN DERRICK. 05:20 - 07:00 1.67 EVAL P OTHCMP PJSM FOR L/D LOGGING TOOLS. L/D LOGGING TOOLS. Printed 11/14/2011 1:37.16PM North America -ALASKA- BP Page 9 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 09:30 2.50 EVAL P OTHCMP CONFIRM GOOD DATA WITH SLB LOGGING ENGINEER. DOWNLOAD AND PROCESS DATA. REPLACE STRAP IN DERRICK THAT IS HOLDING BACK SLB HOSE BUNDLE. 09:30 - 11:00 1.50 PERFOB P OTHCMP LOAD PERF GUNS INTO PIPE SHED. SORT AND ROLL GUNS INTO POSITION. LOAD ALL SLB TCP HANDLING TOOLS ONTO RIG FLOOR. PREP RIG FLOOR FOR RUNNING PERF GUNS. 11:00 - 11:30 0.50 PERFOB P OTHCMP PJSM WITH PRESENTATION ON PERF GUN HSE RISKS.GUNS ARE SCHLUMBERGER POWERJET 1606 6 SPF W/60 DEGREE PHASING 11:30 - 16:20 4.83 PERFOB P OTHCMP M/U 20 PERF GUNS.92 JTS CSH. M/U 2 JTS 2.06 CSH AND CT RISER. 16:20 - 19:00 2.67 PERFOB P OTHCMP SET PUMP TRIP TO 900 PSI. RIH WITH BHA#26. PUMPING 1 BPM DOWN BACKSIDE. PUMPING.43 BPM 560 PSI DOWN COIL P/U WT 22K @ 8850' 10043'FLAG-3'CORRECTION. HOLE CONTINUES TAKING.9 BPM. RIH.TAG PBTD 11649' 19:00 - 19:40 0.67 PERFOB P OTHCMP P/U WT 30K @ 11643' P/U TO 11602.5' CONTINUE PUMPING 1 BPM DOWN BACKSIDE. SET PUMP TRIP TO 4000 PSI. RUN THROUGH PRACTICE FIRING SEQUENCE. RUN THROUGH FIRING SEQUENCE AS PER TCP. PUH FIRE GUNS ON DEPTH @ 19:40,GOOD SHOT DETECTION. SHUT IN CHOKE. PERFORATED INTERVALS: 11200-11250 FT 11410-11600 FT 19:40 - 21:30 1.83 PERFOB P OTHCMP POH 25 FPM. PUMPING 1.5 BBLS DOWN BACKSIDE- PUMPING.59 BPM DOWN COIL 945 PSI. HOLDING 130 PSI WELLHEAD PRESSURE TO PREVENT SWABBING. POH ABOVE TOL @ 8913' 21:30 - 22:00 0.50 PERFOB P OTHCMP PUMP DOWN BACKSIDE 1.5 BPM,DOWN COIL .5 BPM AGAINST A CLOSED CHOKE INJECTING DOWNHOLE TO ENSURE STABLE WELL CONDITIONS. 22:00 - 22:15 0.25 PERFOB P OTHCMP SHUT DOWN PUMPS. OPEN CHOKE.WELL ON STABLE VAC. 22:15 - 00:00 1.75 PERFOB P OTHCMP POH, PUMPING 1BPM DOWN BACKSIDE. PUMPING.5 BPM DOWN COIL. TAG STRIPPER. 10/24/2011 00:00 - 00:35 0.58 PERFOB P OTHCMP PUMP DOWN BACKSIDE 1.5 BPM FOR 30 MIN. MONITOR WELL.CONTINUES ON A STABLE VAC. PJSM FOR UD 1"CSH.CHECK SAFETY JT. Printed 11/14/2011 1:37:16PM North America -ALASKA- BPPage 10 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-01OQL-C: (1,390,194.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:35 - 03:00 2.42 PERFOB P OTHCMP SET BACK INJECTOR. CONTINUE PUMPING 1.5 BPM DOWN BACKSIDE. L/D BHA#26.CQ,XO,2 JTS 2 V16"CSH,XO, DBPV, DC,XO. R/U AND L/D 82 JTS 1"CSH. 03:00 - 03:30 0.50 PERFOB P OTHCMP PJSM FOR HANDLING PERF GUNS. TCP HELD PRESENTAION FOR PERF GUN HSE AND HAZARDS. 03:30 - 05:30 2.00 PERFOB P OTHCMP L/D REMAINING 10 JTS 1"CSH. L/D FIRING HEAD AND PERF GUNS @ PER TCP. CLEAR RIG FLOOR. 05:30 - 08:00 2.50 ZONISO P OTHCMP OFFLOAD PERF GUN RUNNING TOOLS. PREP RIG FLOOR TO P/U LINER TOP PACKER. BRING LINER TOP PACKER UP TO RIG FLOOR. 08:00 - 11:00 3.00 ZONISO P OTHCMP START RIH WITH LINER TOP PACKER. AT FLAG FROM LOGGING RUN THERE IS A 9 FT DEPTH DIFFERENCE. CONTINUE RIH SLOWLY. 11:00 - 12:30 1.50 ZONISO N WAIT OTHCMP WAIT ABOVE LINER TOP FORA LOAD OF 160 DEG KCL TO ARRIVE. HOT WATER IS NEEDED SO THE CT WON'T FREEZE DURING THE LTP PRESSURE TEST. 12:30 - 13:00 0.50 ZONISO P OTHCMP 160 DEG KCL IS ON LOCATION. RIH AND STING INTO TOP DEPLOYMENT SLEEVE. PUMP DOWN BOTH CT AND TBG ANNULUS WHILE RIH. FIND LINER TOP AT 8989 FT,STACK 10K DOWN. NO PRESSURE INCREASE ON EITHER PUMP. 13:00 - 13:40 0.67 ZONISO P OTHCMP PICK UP AND TRY AGAIN. STACKING WEIGHT AT 8989 FT, SEE 40 PSI INCREASE IN CT CIRC PRESSURE AFTER 2 MINUTES. PICK UP AND GET TO BALL DROP POSITION, AT A DEPTH OF 8970 FT. 13:40 - 14:20 0.67 ZONISO P OTHCMP DROP 5/8"STEEL BALL, LAUNCH WITH 1000 PSI. BALL IS HEARD ROLLING RIGHT AT LAUNCH THEN ISN'T HEARD ANYMORE. RUN BACK DOWN INTO DEPLOYMENT SLEEVE TO 8982 FT,PRESSURE INCREASE OF 50 PSI IS SEEN AFTER 2 MINUTES. • PUMP DOWN CT AT 1.1 BPM,SLOW DOWN AT 30 BBLS AWAY AND WAIT FOR BALL TO LAND. AFTER 40 BBLS BALL NOT ON SEAT. RE-LAUNCH WITH 1200 PSI. HEARD ROLLING INITIALLY AT 1.5 BPM THEN CAN'T HEAR IT ANYMORE. PUMP ANOTHER 10 BBLS AT 1.5 BPM. Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page 11 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28©71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:20 - 15:20 1.00 ZONISO P OTHCMP USE 10 BBLS OF FLUID FROM PITS TO TRY AND GET BALL MOVING. RE-LAUNCH WITH 1500 PSI, NOTHING HEARD. MOVE BACK UP TO BALL LAUNCH POSITION AT 8970 FT, GET READY TO LOAD A SECOND BALL. OPEN CAP ON REEL AND INSPECT,SHOVE A TUBE DOWN PAST THE"V"WHERE THE ELINE COMES IN TO THE REEL. PUMP MIN RATE FOR ANOTHER 3 BBLS IN CASE BALL IS ON SEAT, NOT THERE. LAUNCH AGAIN WITH 1000 PSI. NOTHING HEARD. 15:20 - 15:40 0.33 ZONISO P OTHCMP SET PUMP TRIPS TO 2200 PSI AND BRING RATE UP TO 1.7 BPM/2000 PSI. NOTHING HEARD AT THE REEL. PUMP TRIPS,BALL IS ON SEAT. CT IS OFF DEPTH AT 8970 FT,AT THE BALL DROP POSITION. TRY TO RIH TO CORRECT SETTING DEPTH, CAN'T GO DOWN. WHP COMES UP TO 200 PSI. SHUT DOWN BACKSIDE PUMP. PICK UP AND ARE FREE FROM PACKER, APPEAR TO HAVE SHEARED THE GS LEAVING THE PACKER IN HOLE. 15:40 - 17:10 1.50 ZONISO N DFAL OTHCMP POOH. PUMP 1.2 BPM DOWN CTX TBG ANNULUS AND 0.55 BPM DOWN CT. TAG STRIPPER. WELL CONTINUES ON STABLE VAC. 17:10 - 18:00 0.83 ZONISO N DFAL OTHCMP SET BACK INJECTOR. L/D LTP RUNNING TOOLS. CONTINUE FILLING BACKSIDE 1 BPM. 18:00 - 19:30 1.50 ZONISO N DFAL OTHCMP HPJSM FOR HANDLING FISHING TOOLS. M/U BHA#28,3"GS SPEAR,5/8"HYD DC, BOWEN JAR, DBPV, 2 JTS 2 1/16"CSH,XO,QC, CTC. M/U INJECTOR.TEST QTS TO 250/3500 PSI 5 MIN EACH. 19:30 - 21:30 2.00 EVAL N DFAL OTHCMP RIH 87',TAG UP.TROUBLESHOOT RESTRICTION. UNSTAB INJECTOR.FOUND 3 BURRS ON COIL 6'UP FROM CTC. PULL BHA OUT. M/U LUBRICATOR CAR' CONTINUE PUMPING 1 BPM DOWN BACKSIDE. PJSM,TRIM 10'OF COIL.RE-DRESS CTC.M/U AND PULL TEST CTC TO 30K. RE-BOOT E-LINE. PT TO 3500 PSI. 21:30 - 22:00 0.50 EVAL N DFAL OTHCMP SET BHA IN HOLE,M/U INJECTOR. PT QTS TO 250/350 PSI 5 MIN EACH. 22:00 - 23:50 1.83 ZONISO N OTHCMP RIH WITH BHA#28 PUMPING 1 BPM DOWN BACKSIDE. PUMPING.41 BPM 180 PSI DOWN CT. RIH TO 8900'P/U WT 28K.S/O 18K. 23:50 - 00:00 0.17 ZONISO N OTHCMP SHUT OFF PUMP DOWN COIL. RIH 20 FPM.TAG TOF @ 8959' ENGAUGE AND LATCH ONTO LTP. PULL 48K SHEAR OUT. PUH TO 8946' Printed 11/14/2011 1:37:16PM North America -ALASKA-BP Page 12 of 14 Operation Summary Report Common Well Name. 14-28 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project: Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292070800 Active Datum: Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/25/2011 00:00 - 03:40 3.67 ZONISO N DFAL OTHCMP PUMP DOWN BACKSIDE AGAINST A CLOSED CHOKE 1.75 BPM. POH WITH FISH 25 FPM HOLDING 125 PSI BACK PRESSURE WITH CHOKE. SOME RESTRICTION @ 7709'-GLM. PULL 15 FPM PASSING THROUGH JEWELRY. 3000'in 4.5 TBG PULL 45 FPM. 03:40 - 04:00 0.33 ZONISO N DFAL OTHCMP WELL CONTINUES TO BE VAC-TAKING ALL WE CAN PUMP. PJSM FOR L/D BHA. CONTINUE PUMPING DOWN BACKSIDE 1.5 BPM. 04:00 - 04:15 0.25 ZONISO N DFAL OTHCMP UNSTAB INJECTOR. L/D FISHING BHA. RECOVER LTP,ALL SEALS INTACT. 04:15 - 05:15 1.00 ZONISO N DFAL OTHCMP M/U BHA#29,MULE SHOE,SEAL ASSY, LOCATOR,NEW 35KB LTP, 3"GS RUNNING TOOL,XO,3/4"DC,XO,2 JTS 2 1/16"CSH,XO,QC, CTC. M/U INJECTOR.TEST QTS TO 250/3500 PSI 5 MIN EACH. 05:15 - 10:45 5.50 ZONISO N DFAL OTHCMP RIH 60 FPM.PUMPING DOWN BACKSIDE 1.6 BPM. SET PUMP TRIP AT 300 PSI. PUMPING DOWN COIL.5 BPM 165 PSI. NEAR BOTTOM WAIT ON LOAD OF 160 DEG KCL AND ACOUSTIC DEVICE FROM SLB TCP TO BETTER HEAR THE BALL ROLLING. RIH TO TOL @ 8989' 10:45 - 13:45 3.00 ZONISO N DFAL OTHCMP STING INTO TOL WITH SEAL ASSEMBLY SET DOWN 10K.P/U TO BALL DROP POSITION. PUMP 3 BBLS HI VIS PILL AHEAD, LAUNCH 5/8"ALUM BALL WITH 1800PSI. CONTINUE PUMPING TOTAL 15 BBL HI VIS SWEEP. HEAR BALL ROLLING,STACK 10K, P/U TO BREAKOVER PLUS 1'TO 8991.5 AT SETTING DEPTH. PUMP 20 BBLS 1.62 BPM 1500 PSI.SET PUMP TRIP 300 PSI. PUMP.5 BPM 100 PSI. ATTEMPT TO PUMP BALL ON SEAT. PUMP TOTAL 96 BBLS.OPEN BAKER CHOKE.BLEED CT PRESSURE TO 0 PSI. P/U 20',SET BACK DOWN 10K, P/U TO BREAKOVER @ 8991.8'. CLOSE BAKER CHOKE. WITH PUMP TRIP @ 300 PSI PUMP.56 BPM ATTEMPTING TO PUMP BALL ON SEAT. SURGE COIL WITH 1500 PSI NUMEROUS TIMES. tf Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page 13 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site: PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:45 - 14:30 0.75 ZONISO N DFAL OTHCMP DISCUSS WITH ODE AND FIELD SUPERINTENDANT. DECISION MADE TO DROP 5/8"STEEL BALL. PUMP 2 BBLS HI VIS SWEEP AHEAD.ON DEPTH AND IN BALL DROP POSITION, LAUNCH 5/8"STEEL WITH 1900 PSI, CONTINUE WITH 10 BBL HI VIS SWEEP. HEAR BALL ROLLING.PUMP 13 BBLS 1.26 BPM 1100 PSI. BALL OVER GOOSENECK,AT 15 BBLS SET PUMP TRIP TO 500 PSI PUMPING.65 BPM 125 PSI. 14:30 BALL ON SEAT AT 20 BBLS AWAY. PRESSURE TO 1200 PSI.SET LTP.SET DOWN 10K. 14:30 - 15:40 1.17 ZONISO P OTHCMP WITH LTP SET OPENCHOKEAND FILL BACKSIDE UNTIL GOOD RETURNS AT SHAKER.SHUT IN CHOKE AND TEST LTP TO 250 PSI FOR 5 MIN. TEST TO 2400 PSI FOR 30 MIN.CHART RECORD TESTS.GOOD TEST. SEND TEST RESULTS TO WTL AND GET APPROVAL TO PROCEED WITH WELL PLAN. 15:40 - 17:45 2.08 ZONISO P OTHCMP POH WITH RUNNING TOOLS. FLOW CHECK AT SURFACE,WELL CONTINUES ON VAC. CONTINUE FILLING BACKSIDE 1.5 BPM. 17:45 - 18:20 0.58 ZONISO P OTHCMP PJSM,STAND BACK INJECTOR. UD RUNNING TOOLS, RECOVER BOTH 5/8" BALLS 18:20 - 20:10 1.83 BOPSUR P POST M/U NOZZLE AND INJECTOR. RIH TO 2500' PJSM WITH LRS. R/U AND PT LINES TO 4000 PSI. 20:10 - 21:45 1.58 BOPSUR P POST WITH LRS,START DIESEL DOWN COIL PUMPING 45 BBLS TOTAL. TAKE OVER WITH RIG PUMP AND DISPLACE DIESEL. FREEZE PROTECT WELL TO 2500'. PULL TO SURFACE. CLOSE MASTER VALVE. 21:45 - 22:10 0.42 BOPSUR P POST PJSM FOR BLOWING DOWN COIL WITH N2. REVIEW REVISED SOP FOR N2 BLOWDOWN. 22:10 - 23:45 1.58 BOPSUR P POST BLOW DOWN COIL WITH N2 @ PER SOP. R/D N2.CONDUCT AAR-JOB WENT WELL, REVISED SOP COVERED ALL AREAS OF THE OPERATION,ELIMINATING ANY CONFUSION. GOOD JOB ON REVISION. 23:45 - 00:00 0.25 BOPSUR P POST PJSM WITH GREASE CREW.UNSTAB INJECTOR. M/U LUBRICATOR CAP.CYCLE AND GREASE TREE VALVES. 10/26/2011 00:00 - 00:30 0.50 BOPSUR P POST PJSM WITH VALVE CREW FOR SETTING BPV. 00:30 - 01:44 1.23 BOPSUR P POST LOAD LUBRICATOR AND TOOLS ONTO RIG FLOOR. R/U LUBRICATOR WITH BPV. Printed 11/14/2011 1:37:16PM North America -ALASKA- BP Page.14 of 14 Operation Summary Report Common Well Name: 14-28 AFE No Event Type:COM-ONSHORE (CON) Start Date: 10/14/2011 End Date: X3-010QL-C: (1,390,194.00) Project:Prudhoe Bay Site:PB DS 14 Rig Name/No.: NORDIC 2 Spud Date/Time:3/4/1982 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292070800 ' Active Datum:Orig Rig on 14-28 @71.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:44 - 02:55 1.18 BOPSUR P POST TEST LUBRICATOR TO 250/3500 PSI AGAINST A CLOSED MASTER AND SWAB VAVE 5 MIN EACH. OPEN MASTER AND SWAB VALVE. SET BPV. R/D LUBRICATOR AND TOOLS.CLOSE TREE VALVES. LOAD OUT TOOLS AND LUBRICATOR. 02:55 - 05:30 2.58 BOPSUR P POST ""PJSM,BLOW DOWN MUD MANIFOLD,CHOKE MANIFOLD.DRAIN STACK. EMPTY AND CLEAN PITS.R/D HARDLINE IN REEL.PREP REEL FOR REMOVAL. LOAD TRAILERS.CLEAN CUTTINGS BOX. 05:30 - 07:30 2.00 BOPSUR P POST PJSM. INSTALL GRAPPLE ON COIL,INSPECT AND CHANGE OUT RAMS ON BOPE. 07:30 - 09:30 2.00 BOPSUR P POST UNSTAB COIL AND SECURE ON REEL. INSTALL BAR AND CLAMP. REMOVE REEL. 09:30 - 12:00 2.50 BOPSUR P. POST PJSM, R/D INJECTOR. 12:00 - 14:00 2.00 BOPSUR P POST PJSM,N/D BOPE. N/U TREE CAP. 14:00 - 18:00 4.00 BOPSUR P POST ATTEMPT TO TEST TREE CAP WITH DIESEL. CALL OUT GREASE CREW TO SEVICE TREE. TEST TREE CAP TO 250/3500 PSI FOR 5 MIN EACH. RIG RELEASED FROM 14-28A AT 18:00 HRS. Printed 11/14/2011 1:37:15PM PARNELL,GOVERNOR ALASKA OIL AND GASSir/ME [I [F ganSEA /SEAN 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSIONANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-28A BP Exploration (Alaska), Inc. Permit No: 211-105 Surface Location: 2342' FNL, 822' FEL, SEC. 9, T1ON, R14E, UM Bottomhole Location: 4171' FNL, 1023' FEL, SEC. 9, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Chair DATED this- �,51-7"'day of August, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMM" 'ON EWELL PERMIT TO DRILL AUG 2 4 2011. 20 AAC 25.005 4F-',7** 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Winj 0 Single Zone AI '&fisoftwasgtffimiss,on ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 CoalbedHydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp C e Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska) Inc. Bond No. 6194193 PBU 14-28A 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12434' TVD 8819'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Govemmental Section): 7. Property Designation(Lease Number): Bay Oil Pool ( AC ) Surface: ADL 028312 2342'FNL,822'FEL, SEC.9,T1ON, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4076'FNL,3766'FEL, SEC. 10,T1ON, R14E, UM September 21,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4171'FNL, 1023'FEL, SEC.9,T1ON, R14E, UM 2560 12,500' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 71 feet 15.Distance to Nearest Well Open Surface: x- 675678 y-5938009 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 1,600' 16.Deviated Wells: Kickoff Depth: 8688 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 107 degrees Downhole: 3295 Surface: 2415 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight , Grade ,Coupling. Length MD ND MD _ TVD (including stage data) 3" 2-3/8" 4.6# L-80 STL 3184' 9250' 8460' 12434' 8819'ss 73 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 10450' 962 ' 9828' 9828' 9014' 9761' Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 400 sx Permafrost II 110' 110' Surface 2493' 13-3/8" 1524 sx AS III:400 sx AS I 2493' 2493' Intermediate Production 9618' 9-5/8" 500 sx Class'G':300 sx AS I 9618' 8811' Liner 1114' 7" 725 sx Class'G' 9314'-10428' 8521'-9601' Tieback Liner 4828' 7" 350 sx Class'G' 4486'-9314' 4432'-8521' • Perforation Depth MD(ft): 9660'-9830' Perforation Depth TVD(ft): 8852'-9016' 20.Attachments: 0 Property Plat 1E1 BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ®Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Zach Sayers,564-5790 Printed Name j nul en Title Engineering Team Leader Prepared By Name/Number Signature , Phone 564-4711 Date iLiii Elizabeth Barker,5645674 Commission Use Only Permit To Drill API Number: PermitQppr gal Date: I See cover letter for Number:4=n2//,,,e,,,5— 50-029-20708-01-00 Il/n 11 I other requirements Conditions of Approval: If box is checked,well may not bebe-used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: IW' * Other: 35 pS� BOP ,G S i--7.-- f Samples Req'd: ❑Yes" I"No Mud Log Req'd: ❑ es IW'No if--Z P 5 ) s` A n R 44-t d r /e 3 HA Measures: Yes 0 No Directional Survey Req'd: Yes ❑No ) x/ 3!// APPROVED BY THE COMMISSION v «< ` Date ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate -e.3o." ORIGINAL , � To: Alaska Oil & Gas Conservation Commission 5ibFrom: Zach Sayers p CTD Engineer tiN Date: August 23, 2011 Re: 14-28A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 14-28. CTD Drill and Complete 14-28A program: Rig Start Date: September 21st, 2011 Pre-Rig Work: (scheduled to begin September 1st, 2011) 1. F MIT- IA to 3,000 psi, MIT-OA to 2,000 psi) Passed 05/18/11 2. W Cycle LDS; PPPOT- T to 5,000 psi Passed 05/111 3. S Drift tubing down to 9,825 with 2.75" centralizer '� '' " 7 xN ry 4. E Set through tubing 7" IBP at 9,795 (above current IBP fish) ' 5. C Set 18 bbl, 17 ppg cement plug in the 7" casing (TOC = 9,475' MD) • 6. V PT MV, SV, WV. Bleed wellhead pressures down to zero 7. 0 Bleed production flow and GL lines down to zero and blind flange 8. 0 Remove wellhouse, level pad 9. V Set BPV and test dart (Gray 5-%8" profile Type `K') 24 hrs prior to rig arrival • Rig Work: (scheduled to begin September 21st, 2011) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high • 2. Drill 2.75" pilot hole from top of cement at 9,475' down to 9,725' (50' Rat hole) - 3. Caliper Pilot hole using PDC logging conveyed on coil 4. Run dummy whipstock drift. Set 2-5/8" OH anchor whipstock at 9,675' (Top of Whipstock) 5. Mill 2.74" window at 9,675' and 10' of rathole in the SAG,"Swa tp he well to Power-Pro SF 6. Drill Build: 3" OH, 402' (30 deg/100 planned) 7. Drill Lateral: 3" OH, 2,334' (12 deg/100 planned) with resistivity 8. Run Triple Combo Open Hole Logs ' riv;12 9. Run 2-3/8" L-80 liner leaving TOL at 9,250' MD 10.Pump primary cement leaving TOC at 9,250' MD, 15 bbls of 15.8 ppg liner cmt planned P� 11.Cleanout liner and run MCNL/GR/CCL log -7,39x 12.Test liner lap to 2,400 psi 13.Perforate liner per asset instructions (1,500') 14.Set 3-'/2" liner top packer, and test to 2,400 psi 1-11 15. Freeze protect well, set BPV, RDMO Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Generic GLV's 3. Test separator Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.0" Casing Program: • 2-3/8", 4.6#, L-80, STL Solid Liner 9,250' MD — 12,434' MD ° • A minimum of 15 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,250' MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 107°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 12,500'. • Distance to nearest well within pool — 1,600'. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Triple Combo Open Hole Logging: Gamma Ray, Induction Resistivity, Density, Neutron. • Cased hole GR/CCL/MCNL logs will be run. Anti-Collision Failures • No Failures Hazards • The maximum recorded H2S level on DS 14 was 590 ppm on well 14-21 on 7/16/1995. • Lost circulation risk is considered High for the fault block drilled in 14-28A. Reservoir Pressure • The reservoir pressure on 14-28A is expected to be 3,295 psi at 8,800' TVDSS. (7.2 ppg - equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,415 psi. Zach Sayers CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE= GRAY GEN 2 WELLHEAD= GRAY � �� SAFETY NOTES: ACTUATOR= AXELSON KB.ELEV= 71' BF.ELEV= KOP= 3800' Max Angle= 36 @ 6500' 23' — 5-1/2"X 4-1/2"XO Datum MD= 9680' Datum TVD= 8800'SS 2185' H 4-1/2"CAM BAL-O SVLN NIP,ID= 3.813" 121 5-1/2"TBG, 17#, L-80,.0232 bpf, ID=4.892" — 23' GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80, ID=12.347" H 2493' I ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3003 3003 0 TGPD DMY RK 0 05/18/11 Minimum ID = 2.75" @ 9323' 2 5401 5192 35 TGPDX DMY RK 0 05/18/11 3 6754 6297 35 TGPDX DMY RK 0 3-1/2" OTIS XN NO GO NIPPLE 4 7709 7088 32 TGPDX DMY RK 0 05/18/11 5 8959 8189 21 TGPDX DMY RK 0 6 9080 8302 21 TGPDX DMY RK 0 4-1/2"TBG, 12.6#, L-80,0.0152 bpf, ID=3.958" 3001' 3001' H4-1/2"X 3-1/2"XO, ID=2.992" TOP OF 3-1/2"TBG —I 3001' TOP OF 7"LNR-SCAB H 4486' I -r- PERFORATION SUMMARY REF LOG: BHCS ON 03/19/82 ANGLE AT TOP PERF: 15 @ 9660' Note:Refer to Production DB for historical perf data SIZE SPF I INTERVAL I Opn/Sqz ( DATE Z X 9201' — 7"X 4-1/2"BAKER S-3 PKR SEE PAGE 2 FOR PERFORATION DATA 9226' — 3-1/2"HES XN NIP,ID=2.75" 9238' I— 3-1/2"LOC SEAL ASSY W/O SEALS 3-1/2"TBG,9.34,L-80, .0087 bpf,ID=2.992" - 9239' X 9241' — 7"X 3-1/2"BAKER FB-1 PKR 7"LNR-SCAB,29#, L-80,0.0371 bpf, ID=6.184" — 9314' I-- ' 9323' — 3-1/2"OTIS XN NO-GO NIP,ID=2.75" 2 9332' — 3-1/2"BAKER SHEA ROUT SUB 3-1/2"TBG-PC,9.34,L-80, .0087 bpf,ID=2.992" — 9333' I-- r 9333' — 3-1/2"TUBING TAIL 9328' — ELMD TT LOGGED 06/30/90 9-5/8"CSG,47#,L-80,ID=8.681" H 9618' I--4 , 9825' —I 2-1/8"BAKER IBP W/1.375"FN 9761' —I TE-020-RK PBTD — 10382' 7"LNR,294,L-80, .0371 bpf, ID=6.184" H 10428' ''''�/�'� DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/23/82 ORIGINAL COMPLETION WELL: 14-28 09/09/96 LAST WORKOVER PERMIT No:'1820120 01/09/02 RN/TP CORRECTIONS API No: 50-029-20708-00 10/03/05 DAV/TLH MIN ID CORRECTION SEC 9,T10N,R14E,3592.44 FEL 4036.78 FNL 05/31/06 DTM WELLHEAD CORRECTION 05/21/11 MBM/PJC GLV C/0(05/18/11) BP Exploration(Alaska) TREE= GRAY GEN 2 WELLHEAD= E 14 28 ACTUATOR= AXELSON KB.ELEV= 71' BF.ELEV= KOP= 3800' Max Angle= 36 @ 6500' \ / Datum MD= 9680' Datum TVD= 8800'SS ❑ Eil k � � PERFORATION SUMMARY REF LOG:BHCS ON 03/19/82 ANGLE AT TOP PERF: 15 @ 9660' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 9660-9676 0 06/09/92 { 2-1/8" 6 9665-9667 0 10/26/91 2-1/2" 4 9686-9710 O 06/09/92 2-1/2" 4 9723-9730 0 06/09/92 3-3/8" 4 9762-9782 0 01/20/83 3-3/8" 4 9798-9818 0 01/20/83 • 3-3/8" 4 9820-9830 0 01/20/83 ' ? 4 9830-9840 S 07/30/84 3-3/8" 4 9880-9885 S 07/30/84 E z �;�;0„ „„„ ,„„.. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/23/82 ORIGINAL COMPLETION WELL: 14-28 09/09/96 LAST WORKOV ER PERMIT No: 1820120 01/09/02 RN/TP CORRECTIONS API No: 50-029-20708-00 10/03/05 DAV/TLH MIN ID CORRECTION SEC 9,T10N,R14E,3592.44 FEL 4036.78 FNL 05/31/06 DTM WELLHEAD CORRECTION 05/21/11 MBM/PJC GLV C/0(05/18/11) BP Exploration (Alaska) TREE GRAY GA 2 14-28A WELLHEAD= GRAY SAFETY NOTES: ACTUATOR= AXELSON KB.ELEV= 71' Proposed CTD Sidetrack BF.ELEV= KOP= 3800' Max Angle= 36 @ 6500' 23' — 5-1/2"X 4-1/2"XO Datum MD= 9680' Datum TVD= 8800'SS 2185' — 4-1/2"CAM BAL-O SVLN NIP,ID= 3.813" ® GAS LIFT MANDRELS 5-1/2"TBG, 17#,L-80,.0232 bpf, ID=4.892" 23' , , ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80, ID=12.347" — 2493' I 1 3003 3003 0 TGPD DMY RK 0 05!18/11 1 2 5401.5192 35 TGPDX DMY RK 0 05/18/11 Minimum ID = 2.75" @ 9323' 3 6754 6297 35 TGPDX DMY RK 0 3-1/2" OTIS XN NO GO NIPPLE 4 7709 7088 32 TGPDX DMY RK 0 05/18/11 5 8959 8189 21 TGPDX DMY RK 0 6 9080 8302 21 TGPDX DMY RK 0 4-1/2"TBG, 12.6#,L-80,0.0152 bpf, ID=3.958" — 3001' 3001' —14-1/2"X 3-112"XO, ID=2.992" TOP OF 3-1/2"TBG —I 3001' TOP OF 7"LNR-SCAB — 4486' PERFORATION SUMMARY REF LOG:BHCS ON 03/19/82 ANGLE AT TOP PERF: 15 @ 9660' Note:Refer to Production DB for historical perf data '' 9201' —I 7"X 4-1/2"BAKER S-3 PKR SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 9660-9676 0 06/09/92 9226' — 3-1/2"HES XN NIP, ID=2.75" 2-1/8" 6 9665-9667 0 10/26/91 2-1/2" 4 9686-9710 0 06/09/92 2-1/2" 4 9723-9730 0 06/09/92 3-3/8" 4 9762-9782 0 01/20/83 - 9238' — 3-1/2"LOC SEAL ASSY W/O SEALS 3-3/8" 4 9798-9818 0 01/20/83 3-3/8" C 4 9820-9830 0 01/20/83 ' 9241' 7"X 3-112"BAKER FB-1 PKR I ? 4 9830-9840 S 07/30/84 9239' --I 3-1/2"TBG,9.3#,L-80, .0087 bpf, ID=2.992" 3-3/8" 4 9880-9885 S 07/30/84 TOL/TOC @ -9,250` 7"LNR-SCAB,29#,L-80,0.0371 bpf, ID=6.184" —I 9314' I-- 9323' H 3-1/2"OTIS XN NO-GO NIP,ID=2.75" 19332' I—I 3-1/2"BAKER SHEAROUT SUB I 3-1/2"TBG-PC,9.3#,L-80,.0087 bpf,ID=2.992" — 9333' 9333' I— 3-1/2"TUBING TAIL Top of Pilot Hole Cement 9,475' 9-5/8"CSG,47#,L-80, ID=8.681" — 9618' I , 9328' — ELMD TT LOGGED 06/30/90 pilot hole in cement plug, KOP @ 9,675' 2-3/8"4.7# L-80 liner, TD @ -12,434' 15° 9795' — Baker Thru-Tbg 7"Packer 7"LNR,29#, L-80, .0371 bpf, ID=6.184" — 10428' itt..AV DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/23/82 ORIGINAL COMPLETION WELL: 14-28 09/09/96 LAST WORKOVER PERMIT No:'1820120 01/09/02 RN/TP CORRECTIONS API No: 50-029-20708-02 10/03/05 DAV/TLH MIN ID CORRECTION SEC 9,T1 ON,R14E,3592.44 FEL 4036.78 FNL 05/31/06 DTM WELLHEAD CORRECTION 05/21/11 MBM/PJC GLV C/0(05/18/11) BP Exploration(Alaska) illl a A 1 .ko• 0.„ 0 i.i tea/ LL 1 ■ a coQA N � � 00 '_ in 0 a ' LIEJegz O g Nco N Q =MD Z a m Q= W m � n na if Z m Z z co O) (O 7 N N N O VI r, N6 O (") (O O C] N O oO ♦ N My. N 10.441 a O CO Q 00 a U N _ O o j C O O U n a "aal (0 LI N O 0 0 N C i '.. a W U pN m to > � Tau ZZ � d 'j,°, Nwr Ol E O d >� 0 > NO) W E l• 20 Cl Cl N 713 A 'O 251— W 2 > > N o 0 y J J U' 6 > N 7 O 01 W. C CD '.I C 0 '6 (5 O . N y J J 0 L N a N O1 d 2 z F 0C N C 5i v m a co 0 O ,I d C C e_, V — LL O 4 d `I w A 0C O O w N U N L `'C vi c n O O R a' re L re N 0 N V C O w N O) V o p cf) NO N r- pJf Z UO `- m V n 03 •^ N O• O CO O (O CO N o. N r d W Of CO Oi OfC a � cna d .fl a t CO - a 0 O 0 o U E g0 G 7 W o a. R m 7 > V N C O� R W N Oi C eh R O 2L L 'AI Z W UJ 'LW N C 2.- Z _Z W 3 u ) Z - 0 o + 0 Z a } 0 Q N N co re 4r w 0 O 0 y rn °i I E 0. co O Cl a E o0 N a N D v- N L co LL y a m m Z = = = G m x p i 0 0 0 0 y w p ,� 0 0 0 0 >: O N O O O m N p I- oo a y N (5 m O N Q C C Q o U3 CO CO m 0 m t U c0 Z 0 N N Z C a` a r- o a Ico a m a ._ N O N N a O m CO 3 3 2 r 'O O N N C 1 °30 Z Q � + 4.v z a a •- a I c a 1111 r C co Lame 111i six N E •• 100 C to ui y o `wok S=W ad _ a a, d u'i an°l a0 g a 2 a c ? ° u o m E : _ _ en N F p •.o ,°t3 d d y a m . m S S. o o d d c .1 RI d 7 u ami cd Z O0 'CA 0 a 2 a 5 Cl) 00.. a 3 3 a 13 5 0 a > > /� O M O CO co 0 ,-- M UD N 0) fD �yL) O O O co N (D CO I� 0N W (O Q) CD 0 r, O O r-..: M O fD (O t` 0) M CD O 6j aCA co M CO N '" r' (O 00 O CO 0 UO W O m CO0 R o44,144.° M ZZ H o 0 N co C co U) 00 N CY COCO W N CO CO O CO a 0 N.- O CO O O C. 0 R 00 N N N. N. Ln T O N M O n U) O U) U) O O N N O I 7 V V N (D CO M 01 0) 0) O O O LO U 0_ M M M M M N O 0) 0) W T CO I- r- 0 N 0 ^ N N N N N N N N N L L L I 0) x o Y a` 2 i CSI Z 0 0 a- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J `. = Q O O 0) O O O O O N N N N (V N N N CU coCOM M M N O O � r r r r r r r r a) co CD ice„ m E J O N N Ol 7 C O F 2 O F 2 w CO 0) co W 7 O co co n N 0 (O U) N U) U) (D 0 CO M CO CO U) 0 M N M O 00 O O C (O N OI. N- N n C N y U) U) CD co C UO O U) N N N N M O .D OI 0 0 0 0 0 0) 01 CO CO I,- N- (O O N R 4- c C 0 C UO LO O O O I` N- N- N- N- N n N- I. F- r Fri, N- n N- N. N I,- n n N- N- N. r N N. N- N.d y (D 0 (O CD CO CO (O CO (D CO 0) CD CO CD CD (D a) 2 w ce o S aio 2 ei u 0 '8 = 2 d 7 N M N 0) CO N- ? N- CO O o CO N- ` C 0) N UO co W N n N- 0) O N n CO C V N - DN DN N m O N N CO M a) N- N N UO 0) 7 0) N W UR 74- (� N 2° a) C co co co co N N a- a- ,- ,_ ,_ a- a- R . .0 C (O CO (D CO (7 (O (O < O O (o D CO D 7.1 L2 N = M CD M M M M M M M M M M M M M M M co rn o) CD W W 0) 0) 0) CD 0) CI) 0) 0) rn J0G2U) O U oZN UUUUUUUUUU0 h A O U cCO cC = O P O m co Q G as L co U) co N V' 03 CD 0) N m CO 0 CO () .� 'O 0 I-- O CO O O (D U) 7 Cn N N- N- N- N ON M CO N U) O U) N O 0 U) N o V V V V N (D CO M T W O) O O O U) 0) 0 0 2 co co co co co N O W W O 0) CO N- N C _ N N N N N N N N N a- a- ,- ‘- •- a- m W - I- 0 0 0 a O co v v UD CO C` M CO v 0 0) CO N- O 03 m V ,- 0) C O U) (` V CD CO N 1- O) 0) co 2 n 00 N C') N- C) 00 N co (') Ui U) O O C CD 0 co co ? 7 N- N CD 03 0a- 0 0 0) 0 0 E . N- N- r N- N- 00 CO CO 0) W 01 0) 0) (O W 0) N z L L I I L • a co 0 2 0 1-- 0 2 N.- N V co O) 0) 0) U) UO N U) CO ID 0) M N CO (11 I- M N- CO CO I- U) co O 0) U O ,- 0O NCO M M M R R UO n N) N. 0) CO N- 0) O CO � n- a0 co O1 0) W O W W W Q) O CO CO CO en CO COco- (ID co- O co- co- 00 W a0 co- (ID oo O N co O r co 0 0 0 N. N. 0) 0 0 U) N 0) CO 00 CO U) 0 U1 CO '7 N. 0) 0 N N O N M O 0) C U) U) N CO N N. U) O CD O m O N 0 U) U)N �CO CO N N N U)N � � � N N N N N N N N N N N N N N N CD N N a N LO N Q m ,-- N 0 QN a) `- 00 Y L- > 2 c co W 7 > O W N U) 0 U) U) 0) 0) V' 7 M U) 0 Cl. N- C- 0) 0) co C co O UO CO co co 0) N ? C 4 V U) M N N n CO CD O O r O N 2. O O ,-- ^ `- `-- co o co O 0 O O O O O O O co 0 N m j.O tD 7 4.0 0 0 co co G L L O0D CO Co 6 N N Co co ^ 0 E m Z O_ d a ` O O O 0 0 O o o C O o n O U) O n O . N pl O O O O O O O O U)U) O O U] O U1 O U) 0 0- O OO n T U) 0a0 O) O O O O O M 0 O O O O O U) 0 (�.) MI al I) n O) 0 0 O 0 N o o O O o o U) O 1■ a O O 0 (O O N. 00 0 O O O — N N co co V u) O Mole � O G O O O Orn a W O co- C co- O) 41 o O C O o 0 0 o O O O h �m; C .. it.". F LL , H Y W W �- Ln .- co rs m=0 a u .. `o C d c F 0 o « m d .0 0 m Z c.) 0. in3 3 0 U) a 0 0 0 (D) CO v o c n o n co co o n n n D v o o CO 0) 0) o Coco 0 0 0) D7 0) o 0 0 0 o U 0 0 0 0 0 0 m of 0) of 6 00 6 o 0 0 o c) 'S co 0) 7 m co coco0) co co Co 03 CD CO aD 0) 0) 0) 0) 0) CO CO v LL � d Bof o 0 N CO �0 _ CO) C (D co L- co 0 N U) O aO L- n O co O. U) U) co 0 7 co N O d' n M CO O m CO co U) n M U) CO 0) n M U) M 0) 7 O 0 n N6 U) n n U) O n OD M O Q cl. D O u, N- u, N N 0) N N UN N N 41 M M O M 0 M V. ' MN N 0 0 0) aD N- N- (D (D U) U) V U OC iN i O O I y tg CD @d o CO co ? d .6 (7) (. co O O O O O O O O O O O O O O O O O O O O O CO > R Z z O O O O O O O O O O O O O O O O O O O O JC 0 a N N N N N N N N N N N N N N N N N N N N • J ci O d co •o) - 2 G r. 2 O F- 2 wL. CO O CO 0) 0) n M .- U) CO M OD CD CO N 0) OD N 0) U) M 0) N CD V 0) N U) CO CO CO 7 co• n• O n (D U) O Q a0 N M (O n n CD N 0) M 0) 7 d co M V 0) 7 7 V V n R V O. n U) U) CO U) N CD o .0 a, M co N L- 3- O O W CO n n (D 0 V V M M N CO C OC n n n n n n n (D CD CD CO CD CD CO CD CO CO CO CO CO n '''D' n N- C, n N- N- CO N- N- N- W N- N- n N- CO N- N- N- CD N- N- 0 n m y) CD CD CD CD m CD CD CD CO CD m CD CD CD m CD CD m CO CD 43 d2 (o a. W C 2o y C d d R r-2 C V 7 V N- COCD N MN 0) CO 0 M U)N 0 0 d C y U O ,- O U) M O V N O) CO 0) n W M M U) ,- co M CO 9 0) U) CD CD 2 A aD W 7 CO O U) U) O CD 7 a0 N4 n O CO O 0) o 2 w d V CD n n N- CO U) n c0 0) 0) N- CD U) CC) CO V d d Of V C M CO oW W M M W co M co co W W W M M M W W W co M M M 07 D7 W W 0 c0 ED M M M W W W M M 4) CO M0) J >> N F 2 Z 0 (ri i0 )n iC co- u) iD iD ui u) ui u) u) U) u) u) 6 vi U) Ui 0 0 a 0 03L- L- U) CD N U) 0 O .-) n 7 O U) O. v) v) M O. 0)T N O O O. n CO (D O CO (D [h U) n co U] W 4) n M W U) M W V O O n (N N6 v) n n U) O .- N- 00 M N- N N 0) N N CD N N CO v) M M 0 M 0 M (D (O N V 7 M N N O O W 00 N- n (0 CO v) 0 C c CO z U) - I- '5 - 'o 0 0_ V CO V n CD N- M U) 0) U) O n CD O M CO 0) CD n m (D M N 0 7 M M W O M v) (O V U) co M N 7 co OD CO M CD O 7 N Cn n 0) N O N 0) M M O O 0) 0) CO N- CD n n OD n U) 7 M M U) co n n CO CO 0 d CO- CO CO CO_ CO CO CD CD CO CO W CO CO CO CO CO CO OO CD 00 N y I 1 i i i I . i i '7 '7 i 2 •• N- O V M CO U) O) N- N- 0) N CO CD M CO N- U) N M N.- N O 0 O. U) 0 (D 0 N V M O OD M n CD U) (O U) CD V 7 7 V N U) (D O 0 CD O 6 U) U) 4 7 V N N O O O 0 O O CD O O O O O O O O O 0 O y CO CO Cb CD CO CO CO CO CO CO O CD CD CO 00 CO CO CO CO CO CO O CO DD CO CO CO CD CC CC 6OD 40 co- co- CO m CO coco- 00 N U) N U) n n M 0) 0) M n CO CO 7 O O O. O O. O O N CO N n n 0) 0 0 0) N n N C) W 0) co O O O O M OO OD O OD U) C) N CD O 0 O N M co CO co co n CD U) CO OD CD CD n CD U) U) CD n N CD n N N N N N N N N N N N N N N N N N N N N a co co M M N O CO 0) R CD n CO 7 CO CD M M N N co co M co O co co CO CO CD CD n O) .- CO M M M M M CO Q n NU) O O) 0) m 0) 0) 0) O 0) O O O O O O O 0) O O 0) 0) tD co U) CO W (D co co O 0) W 0) 0) 0) W co co a) m- r Q O t O co co C O 2 co 4- . 0 z a a a o n o 0 o CD CO CD CD CO 0 0 o CO O o CO o CD o O U) 0 0 CD O CD O O CO O O O CD O O CD O (D 0 Q IIIco N T CJ CJ CD O CD M C] O M0 0 0 M O CD C) 0 M O 01,■�NI alCD CD CD O O N O O n O O O n CD O N O N O 0 L CO CO n n co co m O N M R C U) (O (O n n OD O O O O O O O CO ti 13. C) '- '- .- '- c- V co •Kg ,- sir a `- o c m ��� o *a; m ; .1od a N0) O) a0 0) ODCO CO La 0) c- (D N- ri 0 0 0 Di ai Di 13 a) W a) a) a) CD CO CO CO CO .� m V 0 0 H o 0 CO a C a) co 'R N- N- N CO ,— M R 0. 0 CO U) O O N 1� N. O CO U) T 4 CC ) UCCO ! O co co co co co C' ^ O O O) d co co N Ci Nr U O N N cp > NNp` O V 2 ,15' N CO = d O N 0 O O O 0 0 0 0 O C) 0 (n N Z Z O O O O O O O O O O J c U Q N N O co CD V at N N 0f 3 CC C g J 2 O 1= 2 w LO O U COO CCO. W NO) 0 CO 00)) U) V 4 N O 1. 1. 1. C) 03 U) U1 U) op U) La O U) U) N U 9 0) 0 O O CO CO 1. 1. (0 U) U) C o C O co- U) U) U) U7 U) U) U) U) 0) t - n N. N. N- N- N. N. N- N. N- 16. w N 0) O O (D O O O O O O O d 2 A to W C O C▪ d U (0 'p C V y O O) O N C) 0 V NJ y C U n 7 O) • O N 0) N- 4 e - R Ci Ci 1: N- co o V Oi (0 O �°..) 00 U 0) O co L co N. N- N- CO (° h N. U m 0) A N K K N .0 C U) CO U) U) (o (D (D c0 (D K) t (O t iK a) CO0) 0) CO CO 0) 0) CO CO � T 0O) O) CO O) O O) d) 0) J 1- 2 Z H 0 Z Ui Ui u) v) 0 u) N U) N N r O 0. O) O) ,T 1. N. N C1 C) V () co U) OD O N n n CO CO U) Ce Com') CO C) UD C) M N O O OO) 0) C) co N .- ' ' d C m . W 1 o 0 EL 4 O m 7 U]CO CO C I. O CO CO N CO) N m 7 7 n O - V. 0) C) O O) U) U) U) U) 'R R CO C) V C) N O co O co co co op O CO CO CO 0) 5.12 z - O O N N 0 N- 0 CI CO C) C) co U) N 1. N O ' U) U, C- CO O) N Ci Ui aD Oi O O O O O ,- co co co co O O CO O CO CO y co- O O O O O O co". O O 0 = n co N O 0 0) U] N 0 0) O )O N. 0) N N V ni a) r m o V' (D O 1. co N- O (O O CO O N N N N N N N N N N Q — a co co g N N CO U) VO) CO N COOCOO7 Q CO W CO O O CO O CO O a0 O O O CO CO O CO CO CO CO CO U >. 0 O C _ co cu E m 'T co Q OQ N L r 0 O O O CNN C 0 O 03 40 O Z a a d 0OOOO0O000(O (D a 111M T O O O C co O O O O O V cv s C) Ui ,OM 7 CO .N- r N N C4 C R O `rb a ei N mo e — of Lc 0=wo W a y ., a 0 c C 13 o F o o d . c ) an � 0 CSI Z 0au 30 a "" fn n.a v_ CD 0) U) o S1 m N. O o sr OM) N cD CO yu) CO (4- U M c" ) 7 M u) V cD o • 'OI V V V i+) 7 'V Co N C co co co co co co co 1114.44* CO' 0) c )0- O o0 - N z z z z Z z z o = u) co co co co u7 O U) D) m M cD N N N N cD !` php, a) N N N N c0 01 O) a0 V N O o u) u] N u) 7 N in in i*1 in in cO 7 0 r ,- .M - O N CO 0 J m ro Z z N- o n n n n n J C d < N N O 4 co rn c `° .E 0) m o 0 0 0 0 0 0 0 0000 o c o c o O C O) C Of co O O O O O O O O O O O O• CO s-• 1- 2 O H 2 W V Ni • M u) (O N N c0 cD .- .- m O) O N ,- N- n u) N N O co O O O u) (0 V - V u) a) I- 1` N- u) I- 0) CD O .- O N N CO d' 1 1- cD u) N- u) u) u) u) u) CD Co- co- co- O O 1 c n N- n N N 1,- N- I,- I,- - r N- N- N- N-N. I,- 1N. I,- 1 CD (0 00 CD CO CD cD u) cD cD CO CO CO CO CD ED CO u) CD.y = R N W U ii C O N L a) N a)s, 2 N C N co O O 0000 CD 0000 O 0000 N O N N. ,- M 0 O O O O O O O O O O O u) ED u) C d VA N- co c0 cD D) 0) M ai M c- N- O n M CO U c ` u) N. O u) u) Q1 co 0) N- cl) (0 u) u) u) c0 CD N C 7 1,- n ,-- 0) " N D) D) O O '6 y C .- Y CI u) cDcD cD cD u) c0 u) cO cD u) u) cD cD Enu) (0 c0 cD ` 2 O C M M co co co co co co co co co co co co co co co M M O w N 0 W DI 0 0 0 0 0 co W 0) 0) co 0) 0) 0) D) 0) 0) o) 0) o w ' IX �, m r , ui ui vi cri vi U) ui in u) LI ui ui ui vi °/ ,C 0 a 0 3 0 0 0 t A z 3 2 z m o O 0. cu V O o ,- CD O CO CD CD co I� CD M M O N N- CD M u) NO O c0 O O O N CO N. el C M IT C .- cD O D) D) cd M m 7 7 N O) N W ai ca m N C N. CO D) D) CO c0 N- EDO CO I- N. N M n a O N N N 7 N V 7 CD I- N m 9 1th ,- N .- N N N N N I— + O U V N CD u) O O CD CD 1,- CD N- N. N- CD V CO Cl- 0 0 CO M CO N- CD N- CD 0) O O O I� h. CO ED O CO M m W 7 N N Co cD cD cD W cD cD cO c0 V V c0 u) N b H N- co N O u) LLI D .- CD cD O O O ,-W cD CO CO _ CO CO CO CO N coN CO O CO N ^ N co. CDW M CD O) OD_ 01 z 7 N 7 O 7 N h- N m + R N O co co d M N Z Z Z CD N. M M 00 O o O O 0 ,-: 0000 OP 0000 01. 0000 0 O O 0 0 ,0 O O O O ON. 0000 Or..: 0000 C 6 Dic0 O co O O 0 O 0 co O O O O O co O O O O 0 0 m O co co m rn 5 aoo co-cco 0 0 O Imo- I> F N (1) N V I-- O V: co O O u) co co O) co co n oo O O O O O O O 0 O ▪ 0 0 0 0 0 = o=o Oma- co o r a:_. N 0 O Ei O O O R O u) O CD N. a N o CD m m m to o 0 0 0 CD c=o o u=i o u) V) y O 0 0 0 0 c") N 0 N O 'D m O Q Q °... CO0000 0OO n a >. O .� Cl)m C C ) • c U Q ao C C C c o o o = U O co co c NN a) 8 0) N N ` O O O O) O) z s co a v 1d d m a) C m m m N tn N a . N En N YO CO «O V V. — YO N ,- N CO V N N CO R c 0 .- N M C c`�) I. IN El�' O) .N.. N r N .N. d .N. N N C C C C C --. N C c• C •C• C• 0 N C•C• •.c .0 ,c• O dll O O m L�, m-cc L L = E 0 0 O O O - E 0 0 o O O >,E 0 0 O O O gong A 0, G O C f0 C c„,2' C C c0 C C m a a a a O C m a a a a o c °>,)a s a a ui ' �y c .. z E c6 1 co'o 1— (0 o ~ (0-o ~ co-o � c0 o � co o a O o .- gl V A• y, o c 4 ? t Q Ta.cc Q as Q as Q as Q as Q as co . . N c N M a a ID o m co 0 0 0 N O co co C ¢ T Z O O a U x v O N O j n co aU a) o N O 0 CL O N co 0 7) ct 4 Z z J > z a) U N CO O E co 0 Tr (n .- 3 s- N a) .c 3 C a r ° 2 O 1— 2 W If, c00 Cr O (rO N- 1--- CD CO ui O ii c o N L x00 N 2 O ce C O O N O C� O U) O NM 9 fi hii N 7 q N- 0) O EE _C in it) 2 ea — Q d c u (0 (0 p o r d T. ui a) co (..) N N K T N Ln Ln r CD a 0 0 0 0 Z A ''. rte) I'', csi y E N C - O V 0 Q a) m N V Cr C N CO 0) CO 7 N J ❑ I c) O O O O O o U - rn o a co La a) o m N O 0 0) M act Ea) m E a 3 C O 6 p m O a O O — N CO v LO c0 N... CI a a 0 I— Y W W LO co N. co co I— Q a) Q E M LO CO 0) CO O CO CO (D 0 ' 7 LO 0) 1- CO V O O Z O co N N .— r o) O M CO O CO O n O O O O N LO LO O N M O N n O4 N co O O i 4- 4 V co 0) 0 LO )— N- 0) LO LO 0 0 CO O 0) 3i CO M CO a— 0) O) N- c0 cr N 0 N. CD Ln M ill C N N N N a— .— .— .— a— 1— y + 0 C a `0 0 O co co V co 111 O N- CO N- CO 0) CO N 0 a— CO O 0 Tp 7 .- 0) V O . 0) M O M CO N CO R O LO O N O 1` o) N n Ci 6 O O M V 1` N CO .— V cD Di 0i O M M V O .— 0 0 0) 1- h Ln Y') N- CO LO d' CO N J N 1- 1` n a0 0) 0) 0) co co co co_ co_ Co co co co O CO CO 2) + i i i i i N D) a O mt Oi N N. N- O CO CO 0 CO 0) 0) CO 1` N c0 N 0 CD O •i,) W z N (D ^ O N O O O O O r O CO CO !� O CO-O A .c U) co N � CI V 0i N V' C CO CO N V ui eo ri 0) CO ; 0 1.1 0) 0) 1- co V ,— (O N 0 0 0 0 0 0 0 0 a— JQ a e 1 n co rn rn rn a0 a0 co a0 co co co a0 co co a0 co Q 0 p co- co- co- co- co- co co- co (b co aD co co co co co- ao co co ,O p mV' 2 E, co O O O n N- N- N- h O CO CO O CO CO CO CO co O ▪ a) 7 O•e1 '0 O O O N Ln V) LO V) 0 (D CO CD O CD CD (D CD O 01 'O ❑ N N CO 03 C d 0 '- y a 4 CO CO CO Or. N M C co 1\ T N. V co n co O N V Z a a 4 4 a 2 d o 0) 0) 0) 0 0 0 0 0 0 0 a— 1— 1— a— 1— N N N g . N CO O C CO C) EllC C LS 0 T CO h r� a 0_ a° o o Ui ii MIND O. c a) SZn d ma fi .. a m c < 0 o W d c a) N c� _ _ a z c 4-3 ia` an33o co 0 a U .. aa W I 8 _ ," ` 4r 8 a= a _ o r m — ' F- a o , o ^ - 0 o A — = - 7, a te a Q2 a I .. Y ? 3iwBs - O ry 111 A ^ 3 = ,2a&,2 — �- - 430 .5 w 8 I 8 : 2 , m G a It r. OI a e0 8 I o W g.O 8 = N ,O 8 O 8 T n - = O 0 5� �' N N - _ O r3 (m/8 OSi)(+)quoN/(-)glnos J O RS J q a U 3r• ,�a4 4g a�SS�'y CO y - --- - V] C S B A id 4 J. - `4' E2 nu e 1001 . 88 N o o 0 o 15 o w a�� w��^mom <� � w � � ` o w a` I c S 43 m 1F4 .1(P888M8E,W8,7-ag 8,1 i §8 26-8$o888b8bo8 88 - C a — Ew3a°= pg 1:12 387,8888888888888888 oo �N O a -a o _ — .. . _. z Sm 3 0r n ^ .-S'A§§.mmmmmgmmm I i w wg I I_ 9 �- mm T N zg 8886- @g428 ,428 o j o wSm) = 28888822222^^^^ 88222 888 _ _ 7 my_NMe (ui/U OL)gidaQ po►uaA am' fV h 7 Max N Du 0 _ 'A 41 ■■ - N m I j -r j . r W - - - �. � car `�, i Z _ N P 0 1■■ ■■■■ 1__ _ 3lva nzas .t PE/§2 1111411.1 .1 HIh AIME 1 IIxINN■■ YW ■ ■ VwTc • a2 ■ ail g a ■ I 1° i• r'a4 ■■■■■■■■■■ 0,01100011.1 m , gg ~ �'$g8t1 m y a ■■■■■■■■■MA / 3 ■■■■■■■■E% �.....mon, E■� ir it 81 r ‘01 MEL ..00011110PPP II IEEE 4 I■ III■I 111... 8 71 ii, j' ■ �►.. 6(88 ! ■I ■■■■I r II• ui•'EOTifili L INIEHIL ID 944 1 � V a s pp yy fryV fV• Op Cp O O T N O h V ^ n a^O T� N tV N N• V P.3! N . 11. '�(ig%8 S8)(-.'AildN/(-)93nos ,_Illia ma a F39Mry "- a= W a mS.4'mmcosMao�aoMMM ; > �ci�^ 64%8$a2mamg�m a < •� 8.8s$rrr «rrNrrr a > > t•1 2 000� r > _ S � mm 3m z ""wwRm`4CEAV„41E' Sg'S o - V a ww is >m cg3a ? ' a j ?c Y = < d J n Wj > mYgg_mIlmin rglii.- a �y � m Sa -N q � o e4 dm m m m a d ow 6 z• COD > z1 ; 3; '.?1216IP': aB m0ii, , * - I $ m . : do 8 o ' . c< A . 7"71 ". 2m goo Iglaagoaaa ' oSaawa13 a3o . omSoma 777 m omPG7-a ,RSS882',gt �, 8 o _N 777777777777 a a a a a a a a a a 7 ` pj ' ea mm`$hmmffiffipiiimm ¢ vm Y9$9wv1wAs., m&"•4Ar $ $ oogi4 am • 1 111 141111111 * 11 * 11 1 . 11 E .11 '� TM cma22P o<m;8_ s f Oaxn�w 3 iy$a zg �77-"68862 & &mamm a � 88•nnwnn � n, mg 11 gg _ m" � pig 'o 8g 0 NO o gA pp N O N .1 ilij La. ' Frt U 1 o Oa o E O N Nn°+m — iQ m,-3 C F cooa O_ Z '1gUdg co sLLm _ W� U stn ftg2 Ird a) _ U��1 10 o or U m m„as — N m -c s1,-,1 751 e"' �a.'i N a. 51 - El - c of N 0 a, - c N CO =� i% N AP 1 N N it°,444 N ram BP BAKER ry,,, p HUGNIS Travelling Cylinder Report ,`t� INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 14-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 14 MD Reference: Orig Rig on 14-28 @ 71.00ft(Doyon 16) Site Error: O.00ft North Reference: True Reference Well: 14-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 14-28A Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 8 Offset TVD Reference: Offset Datum Reference Plan 8 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,675.00 to 12,434.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,440.50ft Error Surface: Elliptical Conic Survey Tool Program Date 8/15/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,675.00 Gyro(14-28) GYD-CT-CMS Gyrodata cont.casing m/s 9,675.00 12,434.00 Plan 8(14-28A) MWD MWD-Standard I Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 12,434.00 8,819.09 2 3/8" 2.375 3.000 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 14 14-08-14-08-14-08 Out of range 14-08-14-08A-14-08A Out of range 14-08-14-08AL1-14-08AL1 Out of range 14-08-14-08AL1-Plan#6 Out of range 14-08-14-08AL1 PB1-14-08AL1 PB1 Out of range 14-08-14-08APB1-14-08APB1 Out of range 14-08-14-08AP82-14-08APB2 Out of range 14-09-14-09-14-09 Out of range 14-09A-14-09A-14-09A Out of range 14-09A-14-09ARD-14-09ARD Out of range 14-09B-14-09B-14-09B Out of range 14-10-14-10-14-10 Out of range 14-26-14-26-14-26 ✓ Out of range 14-27-14-27-14-27 11,575.00 9,125.00 1,059.60 220.67 855.15 Pass-Major Risk 14-28-14-28-14-28 9,699.99 9,700.00 0.41 2.57 -1.35 FAIL-Major Risk 14-29-14-29-14-29 Out of range 14-30-14-30-14-30 Out of range 14-30-14-30A-14-30A Out of range 14-36-14-36-14-36 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/15/2011 5:08:20PM Page 2 of 6 COMPASS 2003.16 Build 73 I• .Y•1 S ..,.�,.. • _111.11_ i '...a... I - 0 e1. , M _ I:. • r a,., • R 04, m __ JC on Nm S O. H.. m a • m C m o 2 a `u o a - N v C m m i .. U .. 3 V c m G c m f III Ir. Q V u ;Si 1 = I III • III U U n Q U '_I m t aun Jai ma •.1 iOA CI I1f iimf CLU O aaOi": 1 E •I = C m m 4aCC U G O Z alQ x i 0 MI 1 II 1 -- !Z O▪ a O o'-l' ••• w 2 x> • f I— _ m my U U m • Zf •:• Z2 1.- CI:8 ; f f W1= a -J N � vv • v�� � z N� W mE c � � • • VoxVIX n o ' _ 0 M I _ cf f O = LL OI N - \ •N z . 0cf e = 2U V J • • m UW m Mil IIIC •.r a I I •• '• , i U U I I I \ 0• 1 t N IIII U LLI 1 / al..• • N O O 1 IIII r `w N M� U = s I I I NG ; ....1 i I nee I II .0 Iit z- CID C Z .I' 1111 Ali V o a m ; U 0 n Ce (� 3 0 0 Z 0 U L m S m m U N RI � I 3W J ¢ 2C7 0. ILL. o t C.) ' t 1 a 3 U 1 1 q co 2 YE C,-) _ m.. cu eu re L.' C U III I Ili III V en O m MIC t E I I H I O Zg 8 In lu 30. :tie' I s a Alaska Department of Natural Resources Land Administration System Page 1 of 1 AlaF,ka ..tapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number. 28312 6 Printable Case File Summary See Township,Range,Section and Acreage? Yes No ( New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28312 "Iau Search for Status Plat Updates As of 08/29/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type: 84 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 010N Range: 014E Section: 03 Section Acres:640 Search Plats Meridian: U Township: 010N Range: 014E Section: 04 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 09 Section Acres:640 Meridian: U Township: 010N Range: 014E Section: 10 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-133 T10N, R14E, UM 3, 4, 9, 10 2560.00 End of Case Summary Last updated on 08/2912011. Not sure who to contact?Have a question about DNR?Visit the Report technical problems with this page to the Site optimized for Netscape 7,IE 6 or above. This site also requires that all must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.aaska.gov/projects/las/C ase_Summary.cfm?FileType=ADL&F ileNumber=2 831... 8/29/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME7,Z� / i? PTD# Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: .-- .C74/464,0e-.. .57,>1 POOL: ,e!/,D4/Gse'_ y OL Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 Oao 'a 0 I- CO( 0 - 3D m o cn o cn o (D , ' r 3 G� .< m v; - r 3.o co co CO °' j m � f° . oov o o o D O X N 4.7 O O O m -Im W W W W W OD W W W OD N fV N N N N N N N N (O W J 6) ()1 A 0) N 0 n CO W V 6) U) A CO N -, O CO CO v 6) ()i A OD N -, 0 CO CO 6) 01 A W N O J m 0 cocn 0 -0 K a * 0 co CO O =, D =, D 0 0 0 0 O) 0 -o D g 0 -o O o = cog * * c r 1] z ,. 0 o 0 m m v m ° 7- p p 7 n n v n a, c o = v m m a a n C T o m o SD 7 N a 0 o = m m m 7 m m 7 m m m v 7 P. m D 3. a 3 w a 'c m m m (D c ° 3 < < n n o _ ° 3 3 co < _ _ _ CD3 0 r , 71 O-. n (7 N .. 7 0) 5. a f) N,, Cr) d 0) O = O O (D () O. N o CD r' C) O o m-- ? O O O (D 7 ^' 7 m w• ooW c7) o n3) m o- m ° v v c * n°,.) 3 ° n a v v .0 g C m m x -i 3 7 0) 7 O' (D (� N ° n (D '2 S N N fnD (nD N N N s a 7 N 7 n CD CD CD 0) •7 r T CL n ° (7 St a g (D 0) 7 0 7 O. Q Q O' N `< N' 7 N KD r : '< m ° o C o c X- 7 m .o .0 3 * m ° CD a s w v O ° = N ° N d ND n 5 (Q 6 O co (O N N N N -0 (fl -s 0) N N' "06 '24 N (O O O 0) 3 0) O N �I n o N O 7 C ND 5' O (o 3 N °- (D — (D d (D (D p a n A 7 D c C a n Q ° N N 0- (D a (D ° (N co7C N -° a 9 (o 0 3 m 0 3 n �' ° 7 0 o m o 0 3 v o a a -°O0 0 0 < n n ,.' , o n 7 o 0 Z 7" O 0) c a a N O O A c O r. c) 5.. 7'. - < n (D 0) 7 n -O O ° n o m 0) m F o N a ° (D a O m v C2• N o- o m ° * * m . CA ° z 3(O O '7' O a N -°° m .N--. d W N N 7 �' c N a c- 07 0) Q ° N Q j j .Q c N N D A 3 =- m =; * v ( o (D co_ 3 o Z ...,° a v _.3 m 7 0 0 0 0 ° ° ° ° 3 r Vi(D (D 0 (o ° n '(%) g N N 0) 3 ° co O 0 7r 07 n m a - O 7 �D (D o O" O D C a 0. l • 3c� n ° cmo\••••ii,F, m N o * 6 -a P• o ' m a an ( o oNm 0 m ° wa o0o 0 7 N ZCT • w Cr fp a D O ° o av Q • ° oon ,• o 3 • ' 0 yl N W Dj ° C ap0n �. (D 0 ' CO P° na * c a n o o CL 3 n j o n CO z D p m • 0 Z U' (-) Mn > a X ° a ° — o' ° ° cano occoI(o Oco 0 C o . 5' 7� 7CD j . 0) Z• c O N ° co c O ' tt -c:, o 3 m a °- • N c ., (D o ) CD 90 0 N na, °o (D OD n •on I 1 N O"0p A D 7 o (n 5 . Q -O m N N n 7 o c 0 c 7\ o c c a, -n G. ON a ( NN0) n N X N O o n v rn° 3 N N 0D TIC F., a) 3 aco o_ v? . o o ° 7 w m O O cn 3 m m 7 o O 0 7 o O) Z 7 O m N ,z a T o}- 0 7 N co m 3 z C) C) O CD3 — mco(o w' 7 — O v n 7 07 CN, m o co \V o i z • z z z z z -< -< -< -< -< -< z -< -< -< -< -< z z z z z z z -< -< -< -< -< -< -< -< -< -< -< -< z z m i D D D D O D m m m (D m m D ° m m O O D D D D D D D (D O N N (D N N N N N ° '° D D N N N N N 'N 'N W (n N N N N 'N N N CO N N N N in N O 0 0m N ncp m I > K * -0 ; � N OCI)O) ) W m Cr) X > X m o (n w 3 a, 5, O c z 7r _ (n _ 5 X N 7• O n 0) 0) n , O (D O sp ° a ii j 0) . `` N N o 3 7 N N O-, O D = cn 7- Cr) (a N O N N N 7 O N 5 (Ni) a -o , -o v 0 m 7 U 3 5' - n D 0) `G 7 'D Cr) N (0 co It a CD N a n N. O 0- 5 0 N 7 c) Cr) N 7 '-.. (D CD N () NCO N CD 0 j m (° * m a m D o N 3 . (n a co C co n 0) = C co co CD N 7 7 0 0 01 N f°n O .. N 7 7 a 0 N W 0 7 N m CO - 3 a m o O0 n -, 7 CO N O CD CO — co 7 , Ill n A O 0 a, a (1 co o 7 O N co (Q N 7 0 �. n- 7 a N co A C v, 13 — O O 0) (I) J a N = °G 0) Z O N 7 _ a N O N O 3 7 n 7 N a a 7 O ° A 0N O 'a. O' N 0 N a CD OD 7 m o (3 o N * C D CET m <C a N o w -o ,, N G d *N N N A c * < N N a -1 o - p (� 61 o p o- 3 6) * N (n O 'N • D(o : -o O a 5 o 3 m o oQ m °) o m O 3 O m 0 co O a (n m< 0) o o 0 a. 3 m n O c n 7- 0 m CO C1) D 0 0 m Ii !