Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
211-068
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of he file. al [ - 0 k Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RE AN: OVERSIZED: NOTES: C• •r Items: ❑ Ms: r Grayscale Items: ogs: ❑ Quality Originals: ❑ Poor Other: ❑ Other: BY: 4e1M Date: 'K r9 /if /s/ fll 1 Project Proofing ri'jBY: Date: ' �� /s/ Scanning Preparation 2... x 30 = W d + 15 = TOTAL PAGES (Count does not include cover sheet) BY: Maria Date: Eli/71/14 9 14 /s/ 1 Production Scanning Stage 1 Page Count from Scanned File: 76, (Count does include cover eet) Page Count Matches Number in Sca/f /4L. 'ng paration: YES NO BY: die. Date: 3. /s/ rvi p Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: al, NO TOTAL PAGES: �v ----71/<! Digital version appended by: Meredith Michal M Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: -L-4----- Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc kcc..k a < 0 & a k ct k As k z a 7\ E % 2 0 iii, $ 4 \± § ce9 5 0 #I- c 0 2 � E22 a c >6 a) § ° ® E ) C ° \§ M0 }\ < q 'a § \ 2 2 ® ~ ~ ~ ~ < g a R § § § § § 7 @ ƒ w ƒ $ B B a s / 4 4 4' 4 4 f I k I c c c c k k E q « i ° ° 0 0 0 0 0 o J 0ce \ Q O. O 2 f \ § co \ co in z_ z 2 ■ - - - E 2 E a. Ill O. t 2 z 111 0 Ce J / ° co $ @ ° W § co 7 } z 9 0 k ) / Jz / / - ] $ kJ E I \ co I # O. 21n \ \ j � 0 0 / ¢ E 0 c < / / E ® co� co g 0c 0 / co CZ < 0 a co - 2 E 0 O $ § Ca e- CO 0 £ _ a 2 _ < 0 / co $ 2 k\ CI § 0 Lu 5 \ . \ E o C a a 2 • -J § ) . ) ) f z , e it a ® / ; # ) ■ 2 = § s \ \ a ) \ 0 C,) Z V 0 V V s o _ C 2 — — E 2 z co° 0 eu 0 CO ° 2 % j CO f � a? m CO \ q� z 2 Z s. t. w o z ~ 0 § § L. co 7 / E u. z V ~ . — 2 ) t¢ R } CD CO 2 o £ V n z = 8 k o 2 § z ) 2 \ K o § ) 2 & ¥ > E k § ■ , _ _ 0 # /) E a 0 0 / j 0 / w ] ] ] ƒ £ $ 0 0 <) 0 0 9 0 0 m M O Z N CI _U o O u) 0 z F. a v) u) x or m m co o Ce 0 a O ° CO 0 Om W W O Ce J cox /W re co VQ Z 9 Z 8 a Y N J o to co a M cp 5 o N N n 0 ao E VZ 0 co J a I- 11. N N N CO — f0 M aa) Y o Q a 0 Q o a z o Q ar E z Tu toM N tt0 m O y 3 N N d W co o CI O N. C a E 00 o a c.) Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, June 25, 2012 10:29 AM To: 'Michael Cook' Subject: RE: Walakpa#11,#12,#13 -Surface Hole Section Excess Cement Thanks Mike for the follow-up on the surface cement on these wells. It appears due to the near gauge hole and rough estimations on the surface returns were the cause for the appearance of possible over displacement. I agree that the casing were properly cemented to surface. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Michael Cook[mailto:mcook@petroak.com] Sent: Monday, June 25, 2012 10:01 AM To: Schwartz, Guy L(DOA) Subject: Re: Walakpa #11,#12,#13 - Surface Hole Section Excess Cement Guy, Per discussion regarding excess cement returns to surface while performing primary cementing displacements onn we • . 1. Wale •a#11 Zf f—OG 2. Walakpa#12 3. Walakpa#13 In each well,the surface 12-1/4" hole section was drilled with "gauge" hole to surface hole section TD. A lead slurry HES Type "L",85 sxs,4.31 cu.ft/sxs.,followed by a tail Type"C" slurry at 0.95 cu.ft/sxs. A 40 bbl. dual spacer was pumped ahead of the lead slurry. An open top containment tank positioned at the end of the 16" divert line was used to collect excess slurry. In each surface hole displacement an approximate volume of 50-55 bbls was noted as returns to surface.Cement returns to the open top tank in each well surface cementing displacement was confirmed. Regards, Mike Cook PRA Drilling Supervisor/NSB Wells Drilling Program Direct Office : (907)677-5103 Cellular: (907)444-8822 mcook@petroak.com 6/25/2012 STATE OF ALASKA Ali. .OIL AND GAS CONSERVATION COMM. 3N WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil ❑ Gas ❑Q SPLUG ❑ Other 0 Abandoned 0 suspended ID 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0 GINJ ❑ WINJ ❑ WAG 0 WDSPL 0 No.of Completions: _1 Service 0 Stratigraphic Test 0 2.Operator Name: 5.Date Comp.,Susp.,or 12.Permit to Drill Number: North Slope Borough-Barrow,Alaska Aband. Completed:3-6-12 211068 3.Address: 6.Date Spudded: 13.API Number: Dept.Public Works, 1689 Okpik St.Barrow,AK 99723 2/15/2012 50-023-20038-00-00 4a.Location of Well(Govemmental Section): 7.Date TD Reached: 14.Well Name and Number: Surface: 2555'FNL, 1654'FWL,UM Section 21,T 20 N,R 19 W 3/1/2012 Walakpa#11 Top of Productive Horizon: 8.KB(ft above MSL): 54.7 15.Field/Pool(s): 745'FEL,2214'FSL,UM Section 20,T 20 N,R 19 W GL(ft above MSL): 31.7 Walakpa Gas Field Total Depth: 9.Plug Back Depth(MD+TVD): 1664'FEL, 1959'FSL,UM Section 20,T 20 N,R 19 W Slotted liner to TD-no plug back 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation: Surface: x- 631,553 y-6,243,160 Zone- 6 4708 ft.and/2357 ft.tvd Walakpa TPI: x- 629,165 y-6,242,606 Zone- 6 11.SSSV Depth(MD+TVD): 17.Land Use Permit: Total Depth: x- 628,252 y-6,242,334 Zone- 6 not utilized in completion UIC Private Land Permit No. 10-252 18.Directional Survey: Yes Q No ❑ 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) onshore (ft MSL) 976 ft and/900 ft.tvdss 21.Logs Obtained(List all logs here and submit electronic and printed information per 20AAC25.071): 22.Re-drill/Lateral Top Window MD/TVD: DGR/EWR/ADR/ALD/CTN Not applicable. ROP/D G R/E W R/AD R/ALD/CT N 23. CASING,LINER AND CEMENTING RECORD WT.PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16" 84# L80 22.5 102 22.5 102.5 Auger/26" Single stage:265 sxs 9-5/8" 40# L80 21.5 1193 21.5 1147 12-1/4" Lead:Type:"L" 85 sxs/Tail: Type:"C"285 sxs 7" 26# L80 20.5 3415 20.5 2256 8-1/2" Tail: 90 sxs Type:"G" 4-1/2" 12.6# L80 3237 4701 2209 2356 6-1/8" Slotted Liner 24.Open to production or injection? Yes Q NO❑ If Yes,list each 25. TUBING RECORD interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Interval Open:4-1/2"12.6#L80 BTC(slotted liner) 2-7/8"6.5#L80 EUE tbg tail:3122'and completion pkr not utilized 1st.Penetration-Walakpa Sand Top:3723 MD/2240 TVDSS x 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Base:3909 MD/2247 TVDSS i 6" DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2nd Penetration(fault encountered)-Walakpa Sand Top:4244 MD/2268 TVDSS Base:4606 MD/2294 TVDSS 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): Walakpa#11 Flowback Flowing:unloading wellbore via 4-1/2"tubing&4-1/2"tubing x 7"production casing annulus Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: 4/15/2012 2.50 Test Period -► Not measured Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 420 psig 490 psig 24-Hour Rate -+ Not measured Brine: 160 bbls , 28. CORE DATA Conventional Core(s)Acquired? Yes ❑ No❑., Sidewall Cores Acquired? Yes 0 No 0 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. RECEIVED RBDMS MAY 10 2012 M,c.v g Atm AOGCC Form 10-407 Revised 12/2009 CONTINUED ON REVERSE .�'`' 4/ Submit original only 4, i 3• f'Zi / 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? ❑ Yes 0 No If yes,list intervals and formations tested, briefly summarizing test results.Attach separate sheets to this form,if Permafrost-Top 0 0 needed,and submit detailed test information per 20 AAC 25.071. Permafrost-Base 976 900 ss Walakpa#11 was flowed back to flowback tank,to unload wellbore of NaCI 1st.Penetration completion brine fluids,prior to handover to NSB/WHPacific. Top Walakpa Gas Sand 3723 2240 ss Base Walakpa Gas Sand 3909 2247 ss Encountered fault 2nd.Penetration Top Walakpa Gas Sand 4244 2268 ss Base Walakpa Gas Sand 4606 2294 ss Formation at total depth: Walakpa Gas Sand 4708 2303 ss 31. List of Attachments: 1.Cover Page 2.AOGCC 10-407 Form 3.Walakpa#11 Well Schematic 4. Definitive Survey Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: t c j 1401"1 • 'j!jJ� I \ 1 r - Printed Name: ✓1 �, Title:r+-1,-�i 1 ►r � 1 I Signature:'i• •'V , Phone: \ (7JL o-11.12-7!!,:� Date: !,N INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item lb: Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 11111 3601 C Street Suite 1424 Anchorage, AK 99503 907-272-1232(voice) 907-272-1344(fax) info@petroak.corn Aa► �R�+�AI� Memorandum RECEIVED STATE OF ALASKA MAY 0 9 OIL & GAS CONSERVATION COMMISSION 2012 333 W. 7th Ave. Suite 100 AOGCC Anchorage, AK 99501 AOGCC To: Guy Schwartz—Sr. Petroleum Engineer From: Mike Cook—PetroTechnical Resources Alaska Date: 5/9/2012 Re: Walakpa#11 —Well Completion/AOGCC Form 10-407 Dear Guy, In compliance with AOGCC guidelines, find attached the AOGCC Form 10-407 for the Walakpa #11 horizontal development well, drilled and completed as the forth well in the Barrow Gas Fields Well Development program. Attachments to this document package include 1. Walakpa#11 -AOGCC Form 10-407 2. Walakpa#11 -Wellbore Schematic 3. Walakpa#11 - Definitive Survey Report(March 9th ,2012) 4. Walakpa#11- A.M. Reports Regards, Lkt-i1 . rte-" Mike Cook Petrotechnical Resources Alaska Office : (907) 677-5103 Email : mcook@petroak.com • . . . . 1.... Walakpa#11 :Horizontal Engineer: M.Cook Field:CL=31.7 ft.above Sea Level Gas Development Well Rig: Kuukpik#5 1:unkpik 5 Actual M 54.7 ft(31.7 CL-NISL/23.0-RKB-CL) DIR/LWDISIWD DEPTH-0.10 OH FORM 1101 E SIZE CASING SPECS MUD INFO CEM INFO INFO .—... MD I 'IND ... .i.1:. NONE NONE Permafrost 100 100 .14 tt::: :: 16 in.X-1 11,11 I S1) Well Head:Vetco Gray, FT,„*::::.: 26" weid,d "C Permafrost:265 sxs MB230,2-1/16"5M • . g::::k KOP:incl.=0 deg. 250 250 •. Spud Mud DLS:3.00 deg/100 .... ..:.: SRO-GYRO 0 250 '..'. Lead Cement-"L" :::: BOC:500 ft. >>surface Density:10.7 ppg .....- MWD/GR/RES .N. Cement Excess:40%/ 4..: .X. * 85 sxs displaced. Tail Cement-"C" TOC:500 ft. Density: Freeze Protection:Annuli 15.6 ppg Cement Excess Tx 9-5/8" ...... Base of ..:.: :40%/285 sxs displaced w/diesel Permafrost: 976 900 ss v• '..: Surface Casigg Excess Cement to 9-5/8"40 lbs/ft .:..: Surface:alags L80 BTC-M Internal Yidd:5,750 psi Inclination 31.0 deg. Casing Point 1193 1147 k 12-1/4" Collapse:3.090101 Casing Test:2500 psi PHPA:LSND/Baraza LOT:16.4 ppg EMW ) Production Tubing --- 2-7/8"6.5 lbs/ft MWD/GR/RES L80 EUE Warta!Yidd:10.570 psi Collapse:11,170 psi ..:.. .:.:, ....I. .., ...... ... ...NN lillignitglair.. '.. ..... .......: CLi102 ...... N. ....:. ...,, 7"26 lbs/ft L80 BTC-M ;,....: •••.• ..... Tubing Tail: :.:: . Internal Yidd:7.240 psi 2-7/8"6.5#EUE 3122 2168 k: — Collapse:6030 psi ..... Tall Cement 4-1/2"12.6#BTC 3237 2209 '-----k• %." Type:HES"G": Density :i''''' Slotted Liner Tun_ :::.1$ •••• :15.8 ppg Cement .,,, ...., 7"Casing Point 3415 2201 ss 7' :::: Excess:30%/90 sxs Casing Test:2500 psi EOB: incl.:77.00 deg. Top:Walakpa -:-:... ..... displaced Liner Hanger/Packer Gas Sand-(Heel) 3723 2240 ss :.:•: ...-. ..... ITB.Ext:BHI Model: .:a ..:e. 8-1/2" SLZXP Liner Lap:_liQt. BARADRILL-NfIL FIT:13.0 ppg EMW \", End Directional 3916 2301 (6%) Inclination:90.43 MWD/GR/RES Neutron Logging: ADL/CTN / Production Liner- Slotted 4-1/2"12.6 lbs/f1 L80 BTC 4-1/2"12.6#BTC Slotted Liner SIMS: 4701 2356 Inclination:85.32 TD-Walakpa 4708 2358 AL 6-1/8" Target(Toe) Date Rev by Comments 2/12/2012 M.Cook Well Planning 5/2/2012 M.Cook AOGCC 10-407 Form Petrotechnical Resources of Alaska - / North Slope Borough Walakpa Zone 6 Walakpa { Sperry Drilling Services Definitive Survey Report ort 09 March, 2012 HALLIBURTON Sperry Drilling Services Halliburton Company Definitive Survey Report Company: Petrotechnical Resources of Alaska/North Slope Local Co-ordinate Reference: .i Well Walakpa 11 Project: Walakpa Zone 6 ND Reference: Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL/23.0 I. Site: Walakpa MD Reference: u Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL/23.0 h Well: Walakpa 11 North Reference: True Wellbore: Walakpa#11 Survey Calculation Method: Minimum Curvature Design: Walakpa#11 Database: Sperry AK PRD 16 Project Walakpa Zone 6 Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 06 Using geodetic scale factor Well Walakpa 11 Well Position +N/-S 0.00 ft Northing: 6,243,159.55 ft Latitude: 71.072277 +E/-W 0.00 ft Easting: 631,552.72 ft Longitude: -156.892770 Position Uncertainty 0.00 ft Wellhead Elevation: 0.00 ft Ground Level: 31.70 ft I Wellbore Walakpa#11 Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( 1 (°) (nT) LIGGM2011 2/16/2012 17.61 80.78 57,528 n ...,fes ... Design Walakpa#11 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 23.00 Vertical Section: Depth From(ND) +NI-S +EI- Direction _$ - ,,. E ,,,, ,, (ft) �.a,, (it) . (ft) " ( ) ,,,, i 21.50 0.00 0.00 255.16 Survey Program Date 3/9/201 ,_ ...°.. .a :...... , .,_ u.. From To Survey (ft) (ft) Survey(Wellbore) Tool Name Description ;,Sta, 1)a e,tr 143.00 168.10 Gyro(Walakpa#11) SRG-GYRO-SS Conventional SRG single shots 02/17/2012 257.11 4,631.69 MWD(Walakpa#11) MWD MWD-Standard 02/17/2012 ", -_ Survey , Map Map Vertical MD Inc Azi ND NDSS +NI-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°I100') (ft) Survey Tool Name 23.00 0.00 0.00 23.00 -31.70 0.00 0.00 6,243,159.55 631,552.72 0.00 0.00 UNDEFINED 143.00 0.78 280.58 143.00 88.30 0.15 -0.80 6,243,159.69 631,551.91 0.65 0.74 SRG-GYRO-SS(1) 168.10 0.75 268.77 168.09 113.39 0.18 -1.14 6,243,159.71 631,551.58 0.64 1.05 SRG-GYRO-SS(1) 257.11 3.09 254.64 257.05 202.35 -0.47 -4.03 6,243,159.01 631,548.70 2.66 4.02 MWD(2) 319.24 4.76 254.43 319.03 264.33 -1.61 -8.13 6,243,157.80 631,544.62 2.69 8.27 MWD(2) 381.00 6.51 251.51 380.49 325.79 -3.40 -13.92 6,243,155.89 631,538.87 2.87 14.33 MWD(2) 442.65 7.08 250.50 441.71 387.01 -5.78 -20.81 6,243,153.39 631,532.02 0.94 21.60 MWD(2) 504.59 8.44 253.05 503.08 448.38 -8.38 -28.76 6,243,150.65 631,524.12 2.26 29.95 MWD(2) 566.79 10.66 256.81 564.41 509.71 -11.02 -38.73 6,243,147.82 631,514.20 3.71 40.26 MWD(2) 627.67 13.18 257.43 623.98 569.28 -13.82 -50.99 6,243,144.80 631,502.00 4.14 52.83 MWD(2) 688.21 15.23 258.23 682.66 627.96 -16.94 -65.51 6,243,141.41 631,487.53 3.40 67.67 MWD(2) 752.16 16.59 257.63 744.16 689.46 -20.61 -82.65 6,243,137.43 631,470.46 2.14 85.18 MWD(2) 816.02 17.37 256.69 805.24 750.54 -24.76 -100.83 6,243,132.95 631,452.36 1.29 103.81 MWD(2) 3/9/2012 10:35:43AM Page 2 COMPASS 2003.16 Build 71 Halliburton Company Definitive Survey Report Company: 'Petrotechnical Resources of Alaska/North Slope Local Co-ordinate Reference: Well Walakpa 11 Project: Walakpa Zone 6 TVD Reference: Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL/23.0 I. Site: Walakpa MD Reference: Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL/23.0 FP. Well: Walakpa 11 North Reference: True Wellbore: Walakpa#11 Survey Calculation Method: Minimum Curvature Design: Walakpa#11 Database: Sperry AK PRD 16 Survey Map Map Vertical MD Inc Azi ND TVDSS +NI-S +E/-W Northing fasting DLS Section (ft) (*) (�) (ft) (ft) (ft) (ft) (ft) (ft) 0100') (ft) Survey Tool Name 878.17 19.69 256.10 864.16 809.46 -29.41 -120.03 6,243,127.95 631,433.26 3.75 123.56 MWD(2) 939.01 22.75 256.79 920.87 866.17 -34.56 -141.44 6,243,122.41 631,411.95 5.05 145.57 MWD(2) 1,006.02 24.87 257.88 982.17 927.47 -40.48 -167.83 6,243,116.01 631,385.67 3.23 172.60 MWD(2) 1,071.40 27.52 259.05 1,040.83 986.13 -46.24 -196.11 6,243,109.74 631,357.51 4.13 201.41 MWD(2) 1,133.03 28.53 259.86 1,095.23 1,040.53 -51.54 -224.57 6,243,103.92 631,329.14 1.75 230.28 MWD(2) 1,167.23 30.63 259.44 1,124.98 1,070.28 -54.57 -241.18 6,243,100.58 631,312.60 6.17 247.11 MWD(2) 1,238.65 31.94 259.80 1,186.01 1,131.31 -61.25 -277.66 6,243,093.24 631,276.25 1.85 284.09 MWD(2) 1,302.87 33.45 260.10 1,240.05 1,185.35 -67.30 -311.82 6,243,086.56 631,242.21 2.36 318.66 MWD(2) 1,365.20 35.36 261.54 1,291.48 1,236.78 -72.91 -346.58 6,243,080.32 631,207.56 3.33 353.70 MWD(2) 1,427.74 37.53 261.18 1,341.78 1,287.08 -78.50 -383.31 6,243,074.07 631,170.94 3.49 390.63 MWD(2) 1,492.46 39.67 259.55 1,392.36 1,337.66 -85.27 -423.11 6,243,066.57 631,131.27 3.66 430.84 MWD(2) 1,556.18 41.51 257.70 1,440.75 1,386.05 -93.45 -463.75 6,243,057.64 631,090.80 3.45 472.22 MWD(2) 1,617.51 43.38 257.06 1,486.00 1,431.30 -102.50 -504.13 6,243,047.86 631,050.58 3.13 513.57 MWD(2) 1,682.14 45.19 256.41 1,532.27 1,477.57 -112.86 -548.05 6,243,036.70 631,006.86 2.89 558.68 MWD(2) 1,745.81 47.81 257.24 1,576.09 1,521.39 -123.38 -593.02 6,243,025.36 630,962.10 4.22 604.84 MWD(2) 1,808.87 50.23 257.44 1,617.45 1,562.75 -133.81 -639.47 6,243,014.09 630,915.86 3.85 652.41 MWD(2) 1,873.02 52.20 257.47 1,657.63 1,602.93 -144.67 -688.27 6,243,002.34 630,867.26 3.07 702.37 MWD(2) 1,936.48 55.07 256.69 1,695.25 1,640.55 -156.10 -738.08 6,242,990.00 630,817.68 4.63 753.44 MWD(2) 1,999.04 57.35 256.10 1,730.04 1,675.34 -168.33 -788.60 6,242,976.85 630,767.39 3.73 805.42 MWD(2) 2,061.20 59.09 256.77 1,762.78 1,708.08 -180.72 -839.97 6,242,963.52 630,716.26 2.95 858.24 MWD(2) 2,124.91 61.63 256.95 1,794.28 1,739.58 -193.31 -893.89 6,242,949.95 630,662.59 3.99 913.58 MWD(2) 2,189.64 64.29 257.00 1,823.71 1,769.01 -206.30 -950.05 6,242,935.93 630,606.67 4.11 971.21 MWD(2) 2,251.70 67.12 258.33 1,849.24 1,794.54 -218.38 -1,005.31 6,242,922.85 630,551.65 4.96 1,027.71 MWD(2) 2,314.61 68.97 258.58 1,872.76 1,818.06 -230.05 -1,062.47 6,242,910.14 630,494.72 2.96 1,085.96 MWD(2) 2,379.12 68.92 258.25 1,895.94 1,841.24 -242.14 -1,121.45 6,242,896.97 630,435.97 0.48 1,146.06 MWD(2) 2,442.70 68.77 257.96 1,918.88 1,864.18 -254.36 -1,179.47 6,242,883.69 630,378.19 0.49 1,205.28 MWD(2) 2,505.98 68.52 257.74 1,941.92 1,887.22 -266.77 -1,237.09 6,242,870.24 630,320.82 0.51 1,264.15 MWD(2) 2,570.01 68.75 257.42 1,965.25 1,910.55 -279.59 -1,295.32 6,242,856.35 630,262.83 0.59 1,323.73 MWD(2) 2,631.48 69.02 257.31 1,987.39 1,932.69 -292.14 -1,351.27 6,242,842.79 630,207.12 0.47 1,381.03 MWD(2) 2,694.89 68.84 257.28 2,010.19 1,955.49 -305.15 -1,409.00 6,242,828.72 630,149.65 0.29 1,440.16 MWD(2) 2,759.16 68.78 257.13 2,033.42 1,978.72 -318.42 -1,467.43 6,242,814.39 630,091.47 0.24 1,500.04 MWD(2) 2,822.12 68.37 256.35 2,056.42 2,001.72 -331.86 -1,524.48 6,242,799.90 630,034.68 1.32 1,558.63 MWD(2) 2,885.23 68.07 256.25 2,079.84 2,025.14 -345.74 -1,581.42 6,242,784.99 629,978.02 0.50 1,617.22 MWD(2) 2,949.98 67.91 256.14 2,104.10 2,049.40 -360.07 -1,639.71 6,242,769.60 629,919.99 0.29 1,677.24 MWD(2) 3,012.83 68.33 257.19 2,127.53 2,072.83 -373.52 -1,696.46 6,242,755.12 629,863.51 1.69 1,735.54 MWD(2) 3,076.03 68.07 256.91 2,151.00 2,096.30 -386.67 -1,753.65 6,242,740.92 629,806.57 0.58 1,794.19 MWD(2) 3,140.47 67.92 257.04 2,175.14 2,120.44 -400.13 -1,811.86 6,242,726.40 629,748.62 0.30 1,853.91 MWD(2) 3,202.56 69.46 257.31 2,197.70 2,143.00 -412.97 -1,868.26 6,242,712.53 629,692.47 2.51 1,911.72 MWD(2) 3,264.31 72.01 258.82 2,218.08 2,163.38 -425.02 -1,925.28 6,242,699.44 629,635.68 4.73 1,969.93 MWD(2) 3,328.98 75.09 260.84 2,236.39 2,181.69 -435.96 -1,986.32 6,242,687.39 629,574.86 5.63 2,031.73 MWD(2) 3/9/2012 10:35:43AM Page 3 COMPASS 2003.16 Build 71 Halliburton Company Definitive Survey Report Company: Petrotechnical Resources of Alaska/North Slope'Local Co-ordinate Reference: Well Walakpa 11 Project: Walakpa Zone 6 TVD Reference: =Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL 123.0 F Site: Walakpa MD Reference: ;' Kuukpik 5 Actual @ 54.70ft(31.7 GL-MSL/23.0 I Well: Walakpa 11 North Reference: s True Wellbore: Walakpa#11 Survey Calculation Method::• Minimum Curvature Design: Walakpa#11 Database: .Sperry AK PRD 16 a • Survey �. yygg,,� r 4 3i1a ct.�„ 0'.°"*++Ci i}4 ' 41.4' � ' 1 n t# f ^�f,. 9VSk '"G.,v+" 4 z 04004 '' 4 f ''�: k'^�£ aka t .� Map Map ... :..Vertical MD Inc Azi TVD TVDSS +NI-S +EI-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°1100') (ft) Survey Tool Name 3,350.73 76.31 261.10 2,241.76 2,187.06 -439.27 -2,007.14 6,242,683.70 629,554.11 5.73 2,052.70 MWD(2) 3,442.81 77.74 261.26 2,262.44 2,207.74 -453.03 -2,095.80 6,242,668.33 629,465.72 1.56 2,141.93 MWD(2) 3,505.04 79.57 262.41 2,274.68 2,219.98 -461.69 -2,156.20 6,242,658.56 629,405.50 3.45 2,202.53 MWD(2) 3,566.87 83.63 260.85 2,283.71 2,229.01 -470.60 -2,216.70 6,242,648.55 629,345.17 7.02 2,263.29 MWD(2) 3,629.35 85.74 258.01 2,289.50 2,234.80 -482.01 -2,277.84 6,242,636.03 629,284.25 5.65 2,325.32 MWD(2) 3,690.24 86.79 256.78 2,293.46 2,238.76 -495.27 -2,337.14 6,242,621.69 629,225.22 2.65 2,386.03 MWD(2) 3,752.33 86.23 257.01 2,297.24 2,242.54 -509.32 -2,397.50 6,242,606.54 629,165.13 0.97 2,447.98 MWD(2) 3,813.70 89.39 255.74 2,299.59 2,244.89 -523.76 -2,457.09 6,242,591.01 629,105.82 5.55 2,509.28 MWD(2) 3,875.19 87.78 256.36 2,301.11 2,246.41 -538.58 -2,516.74 6,242,575.10 629,046.44 2.81 2,570.74 MWD(2) 3,916.89 90.43 255.11 2,301.76 2,247.06 -548.86 -2,557.15 6,242,564.09 629,006.24 7.03 2,612.43 MWD(2) 3,939.93 90.19 255.05 2,301.63 2,246.93 -554.79 -2,579.41 6,242,557.75 628,984.09 1.07 2,635.47 MWD(2) 4,002.38 88.39 254.07 2,302.41 2,247.71 -571.41 -2,639.60 6,242,540.03 628,924.22 3.28 2,697.91 MWD(2) 4,065.44 86.17 254.46 2,305.40 2,250.70 -588.49 -2,700.22 6,242,521.85 628,863.92 3.57 2,760.89 MWD(2) 4,128.16 83.88 255.45 2,310.84 2,256.14 -604.71 -2,760.56 6,242,504.53 628,803.90 3.98 2,823.36 MWD(2) 4,192.64 84.00 255.22 2,317.65 2,262.95 -620.94 -2,822.59 6,242,487.17 628,742.18 0.40 2,887.48 MWD(2) 4,250.74 83.88 255.82 2,323.78 2,269.08 -635.39 -2,878.53 6,242,471.70 628,686.52 1.05 2,945.26 MWD(2) 4,317.76 85.02 256.49 2,330.26 2,275.56 -651.35 -2,943.30 6,242,454.56 628,622.06 1.97 3,011.95 MWD(2) 4,382.38 85.94 256.10 2,335.35 2,280.65 -666.61 -3,005.88 6,242,438.16 628,559.77 1.55 3,076.36 MWD(2) 4,444.20 87.18 253.91 2,339.06 2,284.36 -682.58 -3,065.48 6,242,421.11 628,500.47 4.07 3,138.06 MWD(2) 4,509.01 86.37 252.07 2,342.71 2,288.01 -701.51 -3,127.36 6,242,401.05 628,438.96 3.10 3,202.72 MWD(2) 4,571.10 85.94 253.05 2,346.87 2,292.17 -720.08 -3,186.46 6,242,381.41 628,380.21 1.72 3,264.60 MWD(2) 4,631.69 85.32 250.16 2,351.49 2,296.79 -739.14 -3,243.78 6,242,361.31 628,323.25 4.86 3,324.89 MWD(2) 4,708.00 85.32 250.16 2,357.72 2,303.02 -764.95 -3,315.32 6,242,334.19 628,252.20 0.00 3,400.66 PROJECTED to TD 3/9/2012 10:35:43AM Page 4 COMPASS 2003.16 Build 71 WALAKPA#11 DAILY DRILLING REPOR* 14Feb-12 r Vi. - Gal PI GpvNor North Slope Borough _-_pno(ast Description B F Wap Sits Leaden Stew Hubbard/Jus MclnnN l Wap Name W Wkpa#11 CV Number 68-090 Gil Phone (907)980.4206 API i/AOOCC 50-023-20038-00-00 Land Use Pamdt NSB Osvakgnent Pe mk Mks Phone (907)771-1002 (PTD kh Rip Aoeept 13 Feb @ 2400 Rip CoMnetx Kuukpik Dlirtp,LLC:Kuukpk Drinp Rip#5 P D.t./rtrr» hrs rap.ny o.sgnetlen wall/pa w.p Site Phone 1997)n1-1021 Rig 00 Depth Release --- OS Target Depth(feet)rkb 5335'MD'2349'ND HSE Photo (907)771.1025 Days on Well 1 OART NU Diw „ rter 3 OpHours Next 24- Hours Continueb NU Diverts,System-Test Sams•Mk Mud-PU BHA to Spud OPERATIONS SUMMARY _ 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY WortFinish Houn Description Detail Dally Total 0000 0900 3.0 Hob PJSM-Skid Rig-Bleed Off Steam&W alar to Strtghten Hoses 1 RIg Up/Rig Down 0 18 240 i -- ---_-- Ext 0900 Organize Hoses&Wires-RD Portable HPU-Locate&Install High Pressure Mud Line - 2.Drilling 1200 3.0 TInslai Needle Valvas on 2 9/18'Annulus Sweeps&Tbg Fkg-Bridge Walkway-Whits BLKS i 3.Ream - -- 1200 Put Pipe Shad Together-Buid Berme 8 Sal Heaters for Sub&Pipe Shed-Install Fbwlnng 4.Coring Extensions 8lnwlakSame-Set Mels-Dewaler House-Inslal Dawaler Bubble-Land'nps S.Condition and Circulate 8 Stairs-Cutting Shutes from Upper Shakers-Run Power Cables to Pipe Shed&Deweter 6.Trips _- - House-Hook up Steam&Water to same-Set Cutting Wind Break Conan&Roof Mats- 7.Lubrbale Rig Buid Cover over WaWcpa#12 Collar-Run 3'Hose From Deventer House to Centrifuge B.Repair Rig 2400 12.0 Honest 9.CIO Drill Line 0000 0130 1.5 PU BOP Singe-Renew Rotary TableInstall BOP DoyMang-Start krg Mud 10.Deviation 0130 0330 2.0 natal V/G Adapter Spool 11.Wireline Log _. -.__.r 0330 0600 2.5 instal Stick Riser&Diverter T 12.Run Casing end Cement _..- 19.Wait on Cement - - - 14Nipple up BOP 60 _ RIg Accepted @ 2400 has on 02/13/2012 15.Teal BOP -. Rig reduced skid time from 48 hrs to 24 hrs.compared to Savik 182 16 Dell Stem Test 0845 hrs Gave 48 hr Notice to AOGCC for Dlverter lest. 17.Plugback 1 0910 hrs AOGCC Inspector Jeff Jones waived witness of last 18.Squeeze Cement 19.Fishing EB-15 injected 1457 BBLS 0500 psi(3 BPM)SI Pressure 650 PSI 20.Directional Work - _ TOTAL HOURS: 24.0 - _--- Temperature.-3 F.-Winds 10 MPH ---- 21.Other TOTAL HOURS: 24.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE _ FEET ' GRADE OUT HRS OBD I FTM{ (in) MPG TYPE JETS DEPTH IN(N) DEPTH OUT(N) CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 21.5'RKB.GL is 31.7' CEMENT PROGRAM (�^ Section OD ) Weight(ppf) Grade Thread MD(h) TYRA Contractor Comments } f CIP Type Conductor r 16 I 84 L-80 I PIWelded 101 5 101.5 Halliburton 06-Dec•11 @ 03 30 C Permafrost 1 OC at-15' U-wbad I I • RIP 01 PUMP#2 SPUD MUD FLUID ING EDIENTS Manufacturer Ellis Williams Manufacturer TSM FL Temp(°F) Description To ay Model WH-1000-A Model TSMI000 Time BAROSEAL(400 sack) Liner Size(n) 5 1.Liner Size tiro 8 Weight(lbs/gal) ALDACIDE G(5g pail) • Stroke(In) --_ 10 Stroke(n) 9 --- VIS(sec/ql) --- --_---- __--_ KCI(sack) - B - - --_ BBL/STK @ 96% 0.0583 BBL/STK 0989i 0.0755 PV(cp) Salt-Soler _ SPM SPM 0 1'P(hy100(1) -- -- -- BARACOR 700 GPM GPM 0 aa.(IDW ooft) _ AQUAGEL(Mck) PSI PSI 0 pH - DEXTRID LT black) WELL CONTROL Filtrate WL(mL/30 min) BARACARB 25(neck) SPR Pump#1 21 @ 250 pet SPR Pump 02 20 @ 284 psi Sand(%by vol) AQUAGEL(sack) SPR Pump#1 29 @321 psi SPR Pump 02 30 @407 psi Solids 1%by vol)--- PAC-L(sack) ------ --- ---- FIT EMW(ppg) 13.5 LCM(ppb) BAROID 41(sack) DRILL STRING AND HYDRAULICS CI(mg/L) SOLIDS CONTROL EQ IPMENT AVDP(fps) 0 AVDC(Ips) 0 Ca(mg/L) Shaker Screens Hours BU Strokes 0 •WOB(k-Ib) 0 Cake(API 32nd inch) Super G 35 0 Total Strokes 0 RPM 0 PF/MF(ml) Super G 35 t 0 Pick Up(k-lb) 0 TFA lin') 0 Pit Vol(bbls) Super G 140 0 Slack Off(k-lb) 52K HHP total 0 Hole(bbls) Centrifuge Speed Hours Jet Vel(fps) 0 dP @ BN(D&) 0 Reaerw(bbls) Pit 3 Centrifuge 2300 0 BNA 100 Item Description I OD(In) ID(In) I Gouge(n) Top Connection Length(k) Vendor Cumulative Length(k) r BRT hour • TOTAL BHA LENGTH: MOST RECENT DIREC-IONAL SURVEYS MD INC AZ TVD nee 1S +E/-W VS.._.__ DLS.._ _...__... Calculation_-... VS Aakrwth -- - -j - - KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 13-Feb-12 ....Customer Vol Wei) Content*, t Vol(gal) Customer Vol(gal)1 Customer Vol Wel__ Surmrory Quandtlr _ Vol(gal) Delivered Today 1,050.0 Kuukpik(DZ 1293.3 Tikigaq/Conan(0) 424.0 '5.000gelan Tank(G) Total Diesel Consumed 200848.3 -- _.-.-- -_ - -- _. Witt On Hand Today 6,900.0 Delta Lease(D) '�. 211.9 BSS(D) �23,000glb an Tank(D) Total Gasoina Consumed 9,832.7 Used Today 1,050.0 Umieq(D) 54.0 GBR(D) 7.9 NSB Equipment(D) 0.0 Diesel Consumed Today i 3083.4 Used this Web 57,525.0 Peak(D) 1182.1 Halliburton(D) t 818.1 BGF(G) 180.0 -Gasoline Consumed Today I 18Q0 PERSONNEL AND HSE ___ PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company 7 Position Count I Est Hours I Total Hours Notes Incident Type Today Comments Kuukpik Drilling Rig Crew 22 12 264 Illness 0 Kuukpk Dolling_ :Tool Pusher • 2 12 • 24 Injury 0 HES BSS C enting3 13 38 In camp S stepng n B Spill 0 _ HES-BSS M d 2 13 26 _ 7 nda Disturbance 0 HES-Spent' MWD/LWD/DDl 2 12 24 Bear Sighting 0 a WMies HES _Supervisor 1 13 13 HES auparNsytrp in Barrow Near se 0 GBR Casing Crew 0 M Barrow Umlaq - Ops Support 8 12 90 Spill tech in camp.Al otters in Renew -- - Baker Oil Tools Liner Hanger 0 Peak Rig Support 15 13 195 Five in camp.Ten 54 1019 yap kr Barrow Kuukpik Catering Cook/Clean 5 12 50 AlutipCamp Manager 1 12 12 Beacon 1 12 12 Oasis t Sample Catchers 12 0 PRIHEE Inspector PRA !DSM 2 12 24 PRA ,HSE 1 12 12 -- �-_ Vet.Gray Well Head 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 826 Total Personnel in Camp:50 Individuals . a'-'^-• WALAKPA#11 DAILY DRILLING REPORT 15-Feb-12 try "rd 4'��. NOM Skips Borough _.___� Barrow Oat B Fp i. ,,,. Operate Project Description Drilling/ Well Site Leaders Stew Hubbard/Joe McInnis `V W°N Name adapt#11 co,Number 88.000 CN Phone (907)980.4208 ARS/1 AOCICC 50-023-20038-00-00 Land Use Permit NSB Development Pen*N Office Phone (007)771-1002 (PTD f) Rip Accept 13 Feb O 2400 Rig Contraote Kuukpk Drip,LLC:Kuukpk crump Rip#5 Property Deslgna5on WtWtpa Well Site Phone (807)771-1021 DatelTkne bre __ Rig Release 08:00 Depth Target Depth(feat)deb 5335'MD'2343'TVD HSE Phone (907)771-1025 Date/Time (feel)rkb Days on Well 2 OART PU BHA/Prep to spud Ops II000 Noel24- Cuudnue to PU BHA/DM Out Cmt/Drill Surface Hob Hours OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY 7ilart _Finish Hoon Description Detail I, Daily i Total 0600 Nipple up Divert.'-Realign Starting Head for Divert°,Tee-Install Riser-Flow Tee-Annular-Bell 1 Riy Up i Rig Down 24.0 1200 8.0 ,Npple-Mixing Mud-LOW Pipe Shed with 8'BHA 2 Dulling 1200 Hammer Up Al Riser Bolts/MU Flow Line-Install Table Center Sock-Ra-Do 4'Cement 3 Reaming VMna in Cellar-MU Mud L'ne-MU Blank Flange OF Ki Line/Mud Line-Change Shaker a.Coring Screen Mix Mud-Install Stud Thm Knife Valve away other One Per Request dAOOCC- S.Condition and Circuits Hook Up Mornay Hose to Hydrd/Knife Valve-Function Test Some-Clan Out DMrW of B.Tripe 2400 8.0 Cement from Previous Wel-Continue to Mo Mud Whi°NU Diana Salm 7.Lubricate Rip 1.0 1.0 2400 Finish divMe Ane-lub rt.-test mud line-change out aux Ind are on top drive-work on 8.Repair Rig 1.5 1.5 0600 8.0 had elevators-RU dbl D tongs-PU mud motor 9.C/O Drs Lire 10.D°tiatlon 11.Wietlne Lop -_ -- - -_- -12.Run Casing and Cement - 73.Wait on Cement 14.Nipple up BOP 18.5 23.5 15.Test BOP - _-- _-- 1 G.Drill Stem Ted - -- 17 Plugback --- 18.Squeeze Cement 19 Fisting 20.Directional Work _- - - "'CurrentWeather"' 21.O1h.' -. 2,0 2.0 TOTAL HOURS: 18.0 Temperature -5 F-Winds 9 MPH TOTAL HOURS:, 24.0 28.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG TYPE SERIAL NUMBER JETS J DEPTH IN(ft) DEPTH OUT(ft) FEET GRADE OUT __HRS OB01 FT/HR CASING AND COMPLETION PROGrrtAM-ALL SET DEPTHS MEASURED FROM 21.5'RKB.GL is 31.7' CEMENT PROGRAM Section OD(in) �F Weight( J Grade Thread ' MD(ft) , TVD(ft) Contractor I CIP Type Comments Conductor 18 84 L-80 Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03'.30 C Permafrost r TOC al 15 U-lobed_ PUMP#1 PUMP#2 SPUD MUD FLUID INGREDIENTS Manufacturer Ellis Williams Manufacturer TSM FL Temp('F) - Description Today ModN WH-1000 A Model TSM1000 Time BAROSEAL(408 k) 0 Liner Sim(in) 5 Liner Sim(in) 1 6 Weight(lbs/gal) 8.4 PPG ALDACIDEG(Sgp il) p Stroke(i_) 10 Stroke(in) 9 VIS(sec/qt) 40 KCI(sack) 0 BBL/STf@ 96% 0.0583 BBL/STK @ 98% 0.0755 PV(op) 8 Salt-Solar 0 SPM SPM 0 Yp(Ibd700f1) 14 BA RACOR 700 0 GPM GPM 0 Gels(Ibs/100I1r) 9-13 AOUAGEL(°adt) 0 -- PSI _ PSI 0 pH 9a DEXTRID LT(sack) 0 L ON OL Filtrate WL(mL/30 min) 100 BARACARB 25(sack) 0 p I. 1 ej 250 psi SPR Pump 02 SPRPump#1 28@3 STRING AND HYDRAULICS 20 @407 psi Sand(%by vol) Pp-L(sack) k) 0 SPR Pump#1 28�321 p f SPR Pump 02 30 @ 407 psi Solids(%by vel) PAC{(sack) t 0 t FIT EMW(peg) l 13.5 LCM(ppb) BAROID 41(sack) 0 CS Cl(mg/L) 2.1 SOLIDS CONRtdL EQINPME AVDP(fps) 0 AVDC(fps) 0 Ca(mg/L) -_.... Shaker Screens Haas BU Strokes ! 0 W OB(k-Ib) o Cake(API 32nd inch) 2/0 Super 36 0 Total Strokes 0 ROM 0 PF I MF(ml) Super G 35 0 Pick Up(k-lb) o I I A lin'1 0 Pit Vol(bbls) Super G 140 0 Stock O#(k-Ib) 52K HIIP rural o Hole(biota) Centrifuge Speed Hours Jet Vel(fps) 0 dP @ Bit(psi) 0 Reserve(biota) Pit 3 Centrifuge 2300 0 BHA 100 Ilam Description OD(in) ID(in) I Gauge(In) Top Connection Length(k) ' Vanda I Cumulative Length IfN l BRT hours -_ -. TOTAL BNA LENGTH: ENT DIRECTIONAL RE SURVEYS MD I_____. INC AZ TVD_..l_ sN/SL ♦ •W I VS DLS ' Calculation _..4_.VB Asfrnutln_ KUUKPN(RIG 05 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELNERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:I 13-Feb-12 r Customer F -_Vol Wel) Cwearwr I-Vol Rol) ! _ Customer.... Vol(gp))le Galena, Vol(gal) Summary Quantities Vol WA_ Delivered Today1,050.0 Kuu k(D 1293.3 gaq/C _ ) Tik' am(D) 424.0 5 OOOgatlon Tank(G) Total Diesel Consumed 200,848.3 On Hand Today I 5.250.0 Delo Lease(D) 211ft ',BSS(D) I 23 OOOgaeon Tank JD) Total Gasoline Co sumed 9 832 7 Used Today 1,850.0 Umieg(D) 54ft ,GBR(D) 0 T NSB Equipment(0) 0.0 Diesel Consumed Today 383.4 B Used this Well � 57,525.0 Peak(D) 1182.1 1 Halliburton(D) 1 8181 BGF(G) 780.0 Gasoline Consumed Today 780 0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY CamPlay__ Position Co F Estes rT lel Moura Nobs Incident Type I Today CommentsKkDrilling Re Craw nt 2212 284 Illness 1 0 Kuul-pA DrillingTool Push.' 2 '___ 12 24 Injury 0 HES-BSS Cementing 3 , 13 38 In camp.Six shying inBarrow Spill 0 HES-BSS Mud 2 13 20 Tunda Disturbance 0 _. .. 1...... ° HES-Sporty MWD/LWD/DD 4 12 48 Boar Sighting 0 -._-_ _or -i ... HES _Supervisor 1 13 133 RHES supervisor staying in Barrow Near Miss p OBR Casing Crew 0 In Barrow Um • Ops Support 8 12 88 i Spill tech in camp.All others kr Barrow Bake O'Toole 0 Peek RN Support 15 13 196 Five in camp.Ten staying it Barrow _ Kuukpic Catering Cook/Clean 5 12 80 - _-- - - AluSq Camp Manager 1 12 12 Beacon Medio 1 12 12 Oasis Sample Catchers 2 12 124 PBOPE Inspector PRA DSM 2 12 24 PIRA HSE 1 I 12 12 Vetco Gray Wel Had 2 T 12 j 24_ /!5114 ESTIMATED TOTAL DAILY LABOR HOURS:I 873 Total Personnel in Camp:54 Individuals $.o • WALAKPA#11 DAILY DRILLING REPORT 16-Feb-12 .,,4,ss>",..- -;,!_--SQL._ ---_--.. __--.--- ----- ,/'- a. Barrow Gs Operator Noll Sopa Borough Project Oa.4#ipllal811 1 YVetl 0 Leaden Steve Hubbard/Joe McInnis DrilkmWee Nano Watekpa#11 CIP Number 68-090 C.0 Phone (007)080.4208 �e.;..,,.rm API M I AOOCC 50-023.20038.00-00 Land Use PennIt NSB Development Permit Office Phone (907)771.1002 (PTD N) Rig Accept 13 Feb a 2400 Rig Conbaolo Kuukph Drilling,LLC:Kuukpik Driq Rig 65 Property Dealgnatlon Waktkpa W.N Sib Phone (907)771.1021 Date/Time hrs Rig RNase 06:00 Depth 4W Target Depth(few)rkb 5335'MD'2343'TVD NSE Phone (907)771-1025 DaleRkrw { (feet)rkb Days on Wetl 3 OART Drilling @ 480' OperationsNext 24- Cantlnue to Drill 121/4"Surface Hob I Hours OPERATIONS SUMMARY • 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Bb11 _I Finish 1 Hours D.a.riptlon Detaili Daily Total. 0000 1 0700 1.0 MU 12-1/4"BT Fill Hole and Check for Leake 1.Rig Up/Rig Down 24.0 0700 0730 0.5 Tag up velar at 48'- 2.Drilling I 12.0 12.0 --. --_- Drill -_- by 0730 0900 1.5 and Shoe b 703 3.R OB00 1300 4.0 Dill new formation from 109 to 225'-CBU 4.Coring -- 1300 7 1330 0.5 Backre c/cond hole 5.Condition end Circulate 0.5 ,,____as 1330 1400 0.5 POOH horn 225'to PU smart tools 8.Trips 45 45 1400 1500 1.0 PJSM-RU Gyro sheave-MU Gyro tool on r socket 7.Lubricate Rig 1.0 1500 I 1530 0.5 RU to PU BHA-change elevators-tongs-stage,BHA tools 8.Repair Rig 1.5 1530 1600 0.5 !PU BHA#100/Smalltools-Work on Hydraulic Elevators 9.C/O Drill Line _ 1600 1800 2.0 I,PJSM-PU Smart Tools-Orient UBHO b Mud Motor High Side 10.Devietbn 2.5 2.5 1800 1930 1.5 '.Download to MWD it.Wireline Log 1930 2130 2.0 PU Collars-Jars-t HWDP 12.Run Casing end Cement 2130 2200 0.5 Run Gyro 13.Wad on Cement 2200 2400 2.0 'Drill horn 221'to 260' 14 Nippb up BOP 23.5 0000 0600 0.0 !Drill horn 260'to 480' 15.Test BOP 18.Drill Stein Test 17.Pluflback -.._.._.____... i 18.Squeeze Cement -- _------- 19.Fishing 20.Directional Work ' ---- - ---n- Cumntea Weather"' 21.Other 45 _ 8.5 TOTAL HOURS: 24.0 Temperature:7 F.-Winds 7 MPH TOTAL HOURS: 24.0 70.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) 1 MFG I TYPE 1-SERIAL NUMBER ' JETS DEPTH IN(K) DEPTH OUT(MI FEET GRADE OUT I MRS OBD D FT/HR 1 12-1/4HOBS Miaow) 3x16-1x12 48 I ( I ' __ - _____.. _ __ -___-._.-.-___-..._-- ---1- I CASINO AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 21.MRKB.GL is 31.7' CEMENT PAOORAM ._. B.cBon OD(in) Might Opt) I._orad. Mord I MD NO TVOf Contractor CIP ___. ._L --Comments - Conductor t6 84Welded L-80 101.5 101.5 Malt rkm 28-Dec-110330 *C"PermafrostTOC at-15'-U-tubad PUMP#1 PUMP#2 SPUD MUD FLUI WOREDIENTS Manufacturer EIAs William Manufacturer TSM FL Temp(°F) 72 Doomlptlon Today Model WH-1 000-A '.Modal TSM1000 Time 23:59 BAROSEAL(40#sack) 0 Liner Size(n) 5 Liner Size(in) 6 Weight(lbs/gal) 8.8 ALDACIDE G(5g pail) 0 Stroke lin) 10 Stroke(in) 9 019(sec/qt) 42 KCI(sack) 0 BBL/STK @ 96% 0 0583 BBL/STK @ 96% 0.0755 PV(Up) 7 Salt-Solar 0 SPM --- I 82 SPM 80 YPIll:A/10062_1 28 _---BARACOR 700 0 GPM 201 GPM 254 Gel.(bs/100Rs) 12116/32 AQUAOEL(sack) 72 PSI 723 PSI 'r- 254 --723 pH _ -- 10.2 DEXTRIO LT(sack) 0 WELL CONTROL Filtrate WL(mL/30 min) 17 BARACARB 25(sack) 0 S- -- -. SPR Pump#1 21 6 250 psi SPR Pump#2 20 @ 280 ps, Sand(%by vol) CM l) .25 c Acid(sack) 3 SPR Pump 01 29 @ 321 pts Ir SPR Pum_p#2 30 @ 407 psi Solids(%by vol) 3.4 CON DET PREMIX(drum) 1 _ FIT EMW(ppg) 13.5 i I.CM(ppb) BAROID 41(sack) 0 DRILL STRING AND HYDRAULICS CI(mg/L) 1500 SOLIDS CONTROL EQUIPMENT AVDP(fps) 53 AVDC(fps) 94 Ca(mg/L) f 120 Shaker --- l Sansone Hour.. BU Strokes 557 1WOB(k-Ib) 13.000 Cake(API 32nd bolt) 2/0 Super G 80 8 Tobi Strokes 6,061 RPM 0 PF/MF(mQ 01.3 Super G 70 8 --- Pick U• lob 0 TFA(in') 0 699 PilVd(blob) 363 Supper G 740 I 8 Slack OB(k4b) 52K HHP total I 1 Hob(blob) 39 Centrifuge Hours -_ __.... --)-- serve Jet Vet(fps) 208 dP @ Bit(psi) 340 Re (blots) 97 PB 3 Centrifuge 2300 I 4 BHA 100 Item Description on(In) ID(In) Os118._,In) Top Connection (ft! on LengthVender Cumubtiw Length(R) BRT hours 1 OHCIGRC Milltaoth 8.000 3.000 12.250 P 6-5/8REG 101 HDBS1.01 2 B'SparryOrill Lobe 4/5-5.3 stg I 8.000 ' 5.000 B 6-518 H90 30.68 37.88 BM Sleeve Subtliier '--- ' 12.18!1 � _ -. 3 I Fbel Sub ---- -- 8.082 3.250 _ B 6-5/8•H90 1.80 33.494 i X-Over.Sub _-_-- 8.082 3.250 B 6-5/8"H90 2.00 35.49 5 '8"DM Collar 8.000 3.500 B 8-5l8'H90 9.20 44.69 6 GammalRes/HCIM • 8.000 1.920 B e-5/8"H90 23.48 68.17 7 !8 HOC 8.150 I 4000 B 8-5/8"H90 9.32 77.49 - 6 lOrienting Sub UBHO 7.875 2875 B 8-5/8"H90 2.50 70.98 g Flex Collar 7.812 2.813 B e-5/e"H90 28.08 108.97 10 Flex Collar 8.082 3.312 B 8-5/8"H90 30.57 140.54 11 I Flan Collar 7.785 3.250 B 8-5/8"H90 30.54 171.08 12 X-Over Sub 8.000 2.375 B 4-1/2"XH 280 173.68 13 Jar 8.720 2.750 B 4-1/2"XH 31.51 205.19 14IX-Over Sub 5.937 2.500 8 4"Mod 2.62 207.81 15 I17jte 4*XT-39 HWDP 4000 2 563 525.84 799.85 TOTAL BHA LENGTH: 733.85 MOST RECENT DIRECTIONAL SURVEYS MD INC AZ TVD '. +N/-S +E/-W VS . DLS Calculation VS Azimuth 111.00 0.69 28756 111.00 006N 0.54W 0.51 0.81 257.11 3 os 254 64 257 05 0 47 4 vw 4.18 25s 381,00 651 251 51 38049 3.405 1406W 14.48 2.87 KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 14-Feb-12 Customer I Vol(gal) Custom Vol Wag. Customer VoI(goll Cuatwrr.r :kg la■9 Summary Quantities VoNjgl) Delivered Today. 1.300 0 Kuukplk(D) 308.0 Tkipaq/Conam(DI 273.0 5.000-gallon Tank(G) Total Diesel Consumed 200,848.3 _2- _.. On Hand Today 6./00 0 Delta Lease(D) 2260 BSS(D) '23,000-gallon Tank(D) Total Gaaolloe Consumed 0,841.7 Used Today _ • 1.650 0 umiaq(D)- -_ 540 GBR(D) 7.0 NSB Equipment(D) 0.0 Diesel meay l Consud Tod 2,205.0 ..n. Used this Well 59.257.0 Peak(D) 870.0 Halliburton(D) 483.0 BOF(G) 209.0 Gaeolme Consumed Today 209.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT IME SUMMARY Company1 Position Count Est Hours Total Hours Moles • Incident Typo Today Comment Kuu•b Drilling Rip Crew 22 12 264 Illness km•it DnSn' Tod Pusher 2 12 24 • Injury HES•BSS Camantn• 1 3 13 39 In asap.Sou staying In Bartow SO HES-BSS 13 Mud 2 20 Tunda Disturbance -___. -. __- HES--Sperry MWD/LWD/DD 4 12 48 Bear Sighting HES Supervisor 1 13 13 HES supervisor tt.ylng In Bartow Near Miss OBR Casing Crew 0 In Barrow Unliaq Ops Support_ 8 12 96 Spil tech In camp.Al others In Barrow Kuukpik ,Ops Manager 1 12 12 Peak 1 Rig Support t- 13 195 Five in camp.Ten Moving kl Bartow Kuukpik Catering Cook/Clean S 12 80 Alutiludiq Camp Manager 1 12 12 Beacon Medic 1 12 12 Oasis Sample Catchers 2 12 24 PR :HOPE Inspeclo. PRA DSM 2 12 l� 24 PRA HSE 1 12 12 PRA Supervisor 1 12 12 _ ESTIMATED TOTAL DAILY LABOR HOURS: 873 Total Personal In Camp:85 Individuals P11111...11 WALAKPA#11 DAILY DRILLING REPORT 17-Feb-12 1,."{ Operator Nobe Slope Borough r Project Daecrlpdon Ba Q F A Well Site Leaders Same Hubbard/Joe McInnis rs�,�` Well Nam. Walekpe 011 CIP Number 68-090 Cell Phar (907)980-4206 API 0/AOOCC 50-023-20033.00-00 Land Use P.nnt NSB Development Penna Office Phare (907)771-1002 (PTD 0) --.. -- Ria Accept 13 Feb @ 2400 Rig Contractor Kuukpik Drilling,LLC:Kuukpk Drilling Rig 05 Property°planation W.lakpa W.11 Site Phone (907)771-1021 Det.Rea hrs Rig Reba. 00'90 Depth 1208'TD Target Depth(N.l)rkb 5335'MD'2343'ND NSE Phone (907)771.1025 Days on Well 4 OART RIH to Final CondNbn Run 10,95/8'Coping OMratM t 24- Condition Hole-POOH-Lay°BHA-Prop I.Run 95/8'Ceg B Cent Same ouns OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY 9NrtFinish Hours Description Detail Daily Total 0800 1200 6 0 Rotate 8 Slide From 475'to 734' 1.Rig Up!Rig Down 24.0 1200 2400 12.0 �Rotate 8 Stade From 734'10 1173' 2 Drilling 200 r 32.0 00000100 I 1.0 Rotate 8 Slide From 1175 to 1208' 3.Reaming 02---- --__ Weighted 0100 0200 1.0 Circulate BU 8 Pump High Via W sSweep-45 BBLS�570 GPM 4.Coring 0200 0500 3.0 POOH-Shan Trip 1208'to 175' S.Condition and Circulate 1.0 1.5 0500 0600 1.0 RIH for Final Condition Run 8.Trips 30 7.5 - - ----- - - - 7.Lubricate Rig 1.0 8.Repair Rig 1.5 9.C/O Drell Line 10 Deviation 2.5 11.Wireline Log 12.Run Casing and Cement 13.Weil on Cement 14.Nipple up BOP 23.5 15.Test BOP 16.Drill Stem Test 17.Plugback 6.81843 18.Squeeze Cement Received 480 bbb from Rig -.._ 19.Fishing _ - 20.Directional Work "'Current Weather"' 21.Olhr 6.5 TOTAL HOURS: 240 Temperature:4 F.-Winds 7 MPH TOTAL HOURS: 24.0 1000 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(In) I UFO _ TYPE SERIAL NUMBER JETS DEPTH IN(n) DEPTH OUT(h) FEET GRADE OUT I HRS OBD FT/HR 1 12-1/4 i HDBS Milllwth 11748526 3.016-1012 48' 1 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 21.8'RKB.aL Is 31.7' CEMENT PROGRAM Section _OD(in) i W.Ight(ppe) Grade . Thread MD(ft)J_TVD IN Contractor CIP _ Type Comments Conductor Conductor 16 84 L-801 "N gilded 101.5 101.5 Haliio ton 26-Dec-11(Cr,0330 I 'C Permafrost TOC at-15 U-tubed --'1 __.___ '- _ PUMP 01 PUMP 1/2 EPUDMUD FL INGREDIENTS Manufacturer Ellis Williams Manufacturer TSM -FL Temp('F) 87 Description Today Model WH-1000-A Model TSM1000 Time 23.59 BAROSEAL(408 sack) 0 Liner Size(MI_-. 5 Liner Size(in) 6 Weight(Ibagal) 9.3 ALDACIDEG(Sg pail) 0 Stroke(in) 10 Stroke(in) 0 VIS(seclgt) 36 KCI(sack) 0 BBL/STK @ 96% 0.058.3 BBL/STK @ 96% 0.0755 PV(cp) 8 Salt-Solar 0 SPM 97 .SPM 100 VP(ba100fe) -__- 8 BARACOR 700 _ 0 GPM -..._ .237 GPM 317--. _-Gds bs/100ht --- 10/28/38 AOUAGEL(eeck) 50 PSI 1526 PSI : 1528 pH 9 DEXTRID LT(sack) 0 `ELL CONTROL Filtrate WL(mL/30 min) 18 BARACARB 25(sack) 0 SPR Pump 01 21 @ 250 psi ;SPR Pump 82 20 @ 284 psi Sand(%by vel) .25 X-TEND II(bag) 2 SPR Pump 01 29 @ 321 psi 'SPR Pump 82 30 @ 407 psi Solids(%by vol) 7.1 CON DOT PREMIX(drum) 0 FIT EMW(pp9) 115 LCM )DRILL STRING AND HYDRAULICS Cl)mg/L) 1200 BAROID 41(saSOLIDS CONTROL EQUIPMENT AVDP(fps) 65 AVDC(fps) 115 Ca(mg/L) 120 Shaker f Screens Hours BU Strokes 2,879 ''.WOO(k-Ib) 20,000 Cake(API 32nd inch) 2/0 Super G 80 24 Total Strokes 1. --6.215 RPM 74 PF/MF(ml) 0/.2 Super G -.. 170 24 Pick Up(k-lb) 0 TFA fin'1 0.699 Pit Vol(bbls) 362 Super G 140 24 Slack Off(k-Ib) 52K 'HAP total 1 Hole(bbls) 189 Centrifuge Speed 1 Hours Reserve - - _. JJetVVet(1pe) 253 I dP @Bit(psi) 535 Resee(bbk) 59 PO 3 Centrifuge 2300 24 BHA 100 Rpm Deaerl)atlon OD(In) I ID(In) Outgo(h)i Top Comw0tlon u^pthgt1 Vendor Cumulative Length(R) BRT Wows_ I OHCIGRC MMoolh 9.000 3.000 12.250 P 85/eREG 1.01 I HDBS 1.01 2 8 SperryOri Lobe 4/5-5.3 alp 6.000 5.000 B 8-5/8'HBO 30.88 31.89. Bon Sleeve Stabilizer _..- 12.188 3 Foal Sub8.062 3.250 B 6-5/8'H90 1.80 33,49 - --- -- _-_ 4 X-0ver Sub 8.062 3.250 B 6-5/8'H90 2.00 35.49 --___ - -- 5 8"DM Color 8.000 '� 3.500 B 85/8'H90 0.20 44.89 6 GernmalReNiCIM 8.000 1.920 B 8.5/8'H90 23.48 88.17 --_-_- '--_. - --.- 7 8'HOC � 0 8.150 4.000 B 6-5/8"H90 9.32 77.49 --.__- 8 Orienting Sub UBHO 7.875 2.875 B 8518'H00 2.50 7.8.98 9 Flex Color 7.812 2.813 B65/8'HBO 29.98 109.97 10 Flex Collar 8.062 3.312 B 65/8'H90 30.57 140,54 11 'Flex Color 7.785 3.250 B B-5/8'HBO 30.54 171.08 -__- _. 12 �X-Over Sub 8.000 2.375 04-1/2'XH 2.80 173.63 _._.. _--. _.. I 13 Jar 6.120 2.750 B 41/2'"XH205 31.51 .19 14 X-Over Sub 5.937 2.500 B 4"Mod 2.62 _ 207.81 15 17ps4"XT-39HWDP 4.000 2.563 52584 733.65 TOTAL BHA LENGTH: 733.85 MOST R EMT DIRECTIONAL SURVEYS MD _. INC -' AZ ND rte/-8 •E/-W VS OLS I WbuNtlon �Vg AslmWh 1 ---_ __ - 1071.40 I 27.52 259 05 1040.83 46.243 186.2.4 W 201.54 4.14 x 113303 28.53 2S98o 1095.23 51.398 224.71 W 230.41 1.75 _---116723 30.83 -- IS944 1124.97 54.575 241.3290 247.24 8.17 �---- i -_- - KUUKPIK RIG 05 DIESEL FUEL TYPE,RECIPIENT.QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAO REPORT: 14-Feb-12 Customer Vol Wall Customer '� Vol(gal) Customer Vol(gal) Customer Vol(gel) Summary Quantities Vol(gat) - Delivered Today ) 1,700.0 Kuukpik(0) 309.0 �Tikyaq/Conam(D) 273.0 5.000-gallon Tank(G) Total Diesel Consumed 200.848.3 On Hand Today 6,000.0 Delta Lease(D) 229.0 .BSS(D) 23 000-gallon Tank(D) Total Gasoline Consumed S841.7 Used Today2,400.0 Umlaq(0) I 54.0 l GBR(0) 7.0 NSB EquUenl(D) 0.0 Diesel Consumed Today 2,205.0 -_-_-t _. --- Used this Well i 81,851.0 Peek(D) t 870.0 Halliburton(D) 463.0 BOP(G) I 209.0 Gasoline Consumed Today 209.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HOE SUMMARY C mpargr Position Count Est Hours Total Hours Nobe Incident Type r Today Conmpni Kuukpik DnPn• Crew 2212 264 Illness 0 Kinked,Drilling Tod Pusher 2 12 24 Injury �: 0 m HES-BSS 'Ceentin• 3 13 39 In camp.Six stating in Barrow Spite 0 HES-BSS Mud 2 13 28 Tunda Disturbance 0 HES-Sperry MWD/LWD/DD 4 12 48 Bear Sighting TO HES Su 1 13 13 HES supervisor staying Barrow Near Miss peMsor pervisor s ging In OBR Casing Crew 0 In Barrow Umtaq Ops Support 8 12 96 Spill tech in camp.All others in Barrow _ Kuukpik Ops Manager Peak Rig Support 15 13 195 Five In camp.Ten staying in Barrow Kuukpk Catering Cook/Clean 5 ) 12 60 AWliq Camp Manager 1 12 12 Beacon Medic 1 12 12 Was Sample Catchers 212 24 AOGCC BOPE Inspector PRADSM 2 12 24 PRA - HSE 1 12 12 PRA Su pervisor _ ESTIMATED TOTAL DAILY LABOR HOURS: 849 Total Personnel In Camp:66 Individuals !IRO. I • !�'„,-...743r.„ a WALAKPA#11 DAILY DRILLING REPORT 18-Feb-12 �, "' c Operator North Slope Borough Project Description Barrow Gal H d VMS SIM Ludo/ SMve Hubbard/Joe McInnis fr, at1-. , Well Name WaMkpe X11 CIP Number 68-090 Cell Phone (907)980-4208 twat" 50-023-20038-00-00#/AOOCC 50.023-20038-00.00 Land Use Permit NSB Development Permit Wm Phone (907)771.1002 (PTD N) Rig Accept 1 13 Feb @ 2400 Rig Contractor Kuukpb DriWg,LLC:Kuukpit Dding Rip#5 Prepay Designation WNakpa Well SIM Phone (907)771-1021 Dale/Time bra Rig Rekwse �._ 08:00 Depth 1208'TD Target Depth(lest)with 5335'MD'2343'TVD NSE Phone (907)771.1025 DaMITime (feet)dtb Dari en Well 5 DART Cementing 9 518'Casing Operations Nest 24- Fled.Cementing 9 518-Casing/RD HES/WOG ND Duarte Swim-Sto Hours NU BOPS OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Sint Finish Hours Description Detail Daily Total 0800 0700 1.0 Finish RBIH 1.Riy Op/Rig Down 24.0 0700 0930 2.5 •CBU several times-hole unloading-clayrnys to surface hole clean 2.Drilling 3.2.0 0930 1000 0.5 'Pump hi vu weighted sweep-cleaned hole 3.Reaming 1000 1200 2.0 POOH to run cid 4.Coring 1200 1600 4.0 LD BHA downkud smart fools S Condition and CtrcuWe 4.0 5.5 1800 1630 0.5 Cl..n 9,,,-MU Wavelets and rig logs B.Tripe 7.5 15.0 18.90 RU bran 95/8e t-fill line-ebveMr babe-power tongs-false table-centralizers-flt ghee 7.Lubricate Rig 1.0 1800 1.5 and M co9r. 8.Repair Rig 1.5 1800 1830 0.5 PJSM for running 95/8 mg 9.C/O Drill Line 1830 2200 3.5 MU ah Baker Lock-Fist Two Jta-Float Collar 10 Deviation 2.5 2200 2400 2.0 RIH W/Cg 11 Wtreline Log 0000 0200 2.0 Coor le• r : ,..,.... ,.,. ,• :.. n•:C 119_. 12 Run Casing and Cement 12.5 12.5 0200 0330 1.5 PJSM-Rig Up Cmt Headed Equipment for Cmt Job 13.Wait on Cement 0330 0430 1.0 Circulate and Condition Hole for Cml Job 14.Nipple up BOP 23.5 0430 0800 1.5 Pump Spacer-Drop Ben Plug and Pmp 65.2 OW L-8 48.2 Blob-C-Cement 15.Teal BOP Notified AOGCC of upcoming BOPS test-Wt was waived by Chuck Chievy 1115 Ma 2117112 16.Drill Sleet Test ,--_ 17.Plogback E-B 15 18.Squeeze Cement Rood 224 blob from Wala 11-T/A 540/540 20 Fishing r_._-._ _ .._._ _ 20.Directional onal Work "•Currant Weather•-' 21 Other 0.5 --_. -HOU __. .._.. _.. __ TOTAL HOURS: 24.0 Temperature'.-15 F.-WTOTAL Winds 7 MPH HOURS: 24.0 124.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG TYPE • SERIAL NUMBER _ JETS DEPTH IN(ft) (DEPTH OUT(ft). FEET GRADE OUT HRS OBD FT/HR 1 12-114 IDES Mdlt000 11748526 3216-7x12 48' • 1208' 1160' CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 202'RK5 CEMENT PROGRAM Section I ODfinJ Weight(ppl) Grade Thread ! MD TVD(fl) CooMNo 4 CIPm Typo I. _ Comments Conductor 18 84 L-eel +Melded I 101.5 101.5 HaNibunon 26-Dec-11 @ 03:30 "C"Permafrost • TOC alt-15 UWbed Surface Casing ' 95/8 40 LSO BTCM : 1.193 1,135. Halliburton I 18-Feb-126 L 8 C t Returns to Surface PUMP#1 PUMP 82 SPUD MUD FLUD INGREDIENTS Manufacturer Ellis Williams Manufacturer TSM Temp(°F) 0 Description Today___-__._- Model WH-1000-A Model TSM1000 Time 22:58 DESCO CF(sack) 2-Liner Size Sim(in) 5 Liner Size(b) ) 8 Weight(lbs/gal) B.5 ALDACIDE G(5g pad) 0 Stroke(in) 10 Stroke(in) 9 VIS(sec/q1) 52 KCI(neck) 0 BBL/STK @ 96% 0.0583 BBL/STK#3 98% 0.0755 PV(cp) 13 Salt-Solar 0 SPM 0 SPM 0 - YP(6WOOR) _- --__-.12 BARACOR700_.._ 0 GPM 0 GPM 0 Gels(6d100h') 10/31/48 AQUAGEL(sack) 15 _ PSI 0 i PSI 0 pH 02 DEXTRID LT(sack) 0 WELLCONTROL Filtrate WL(mL/30 min) 15 BARACARB 25(sack) 0 SPR Pump#t 21 @ 250 psi 'SFR Pump#2 T 20 @ 284 poi Sand(%by vel) __..25 X-TEND II(bag) 1 SPR Pump#1 29 @ 321 psi SPR Pump#2 . 30 @ 407 poi Soida(%by vel) 7.7 CON DET PREMIX(drum) 1 1 FIT EMW(pPg) 13.5 LCM(ppb) BAROID 41(sack) 0 - _ DRILL STRING AND HYDRAULICS CI(mg/L) 1200 SOLIDS COM'•L EOIRPM AVDP(fps) 0 AVDC(fps) 1- 0 Ca(mprl) 120 Shaker 7 Screene_1. Nowa BU Strokes 0 WOO(k-lb) I 0 Cake(API 32nd inch) 2/0 Super G 80 24 _.__... _ - - Total Strokes RPM ' 0 PF/MF(ml) 0/.25 Super G 70 24 Pick Up(k-lb) 0 TFA(in°l 0 Pit Vol(bbb) 218 S prG 140 240. --- Slack Off(k-lb) 0 HHP total0 Hob(bbls) 218 CenhIuge S dns r Neo Jet Vel(fps) 0 dP @ Bit(psi) 0 Reserve(bbls) _-- 52 Pt 3 Centrifuge i 230 I 5 BHA 200 Item 1 Duoriptlon OD(in) I ID(In) I Gauge(In) Top CumationLength fit) I Wndo CumuMlhn. (ia� BRT hurt I I I HDBS 2 3 4 8 t 10 11 t. 12 r ___. 13 _ 14 15 - TOTAL BHA LENGTH: MOST RECENT DIREC-)OVAL SURVEYS MD INC II AZ TVD ', ala/-8 aE/-W VS DLS. Calculation VS Azimuth 1071.40 2].52 259.05 1040.83 46.245 198.24 W 201.54 4.14 1133.03 28.53 ' 259.86 1095.23 51.53 5 224.71 W 230.41 1.75 1187.23 30 63 259.44 1124.97 54 57 5 , 241.32 W 247.24 6.17 --- - - - KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 10•Feb-12 Customer.._ Vol(gall Customer Vol(mil i Customer Vol(gall Customer I Vol(g.n Summery Quanti es [-- Vol(9.1) . Tki /Conan D) Consumed Delivered Today 1,700.0 Kuukpik(DZ 3370.0 9a9 l 439 0 5.000-gallon Tank(G) Total Diesel 200 848 3 On Haid Today 6000.0 Delta Lease(D)_I 260.0 BSS(D) 23000-gallon Tank(D) Total Gasoline Consumed 9.8417 Used Today 2,400.0 Umiaq(0) 140.0 GBR(D) 7,0 NSB Equipment(D) 0.0 Diesel Convened Today 5.090.0 Used this Well 61,851.0 Peak(D) I 1080.0 Halliburton(D) 714.0 BGF(G) 237.0 Gawlne Consumed Today 237.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY CompanyPosition Count Est Hours Total Hurs N tes Incident Type Today _ Comments Kuukpk Drilling Crew I 22 12 264 Illnasa 0 I Kuukpik Drilling Tool Pusher 2 12 24 Injury 0 HES-BSS !Cementing 3 13 38 In camp.Sbt.MNng in Bartow Spit _.._ 0 HES-BSS IMud 2 19 26 Tunda Disturbance -- 0 HES-Sperry MWDILWD/OD • 4 12 48 Bear Sighting 0 -- HES _ Supervisor I_ 1 13 13 HES supervisor Wyfn9 in Barrow Near Mss- -.- -- OBR Casing Crew 2 12 24 In Barrow Umuq Ops Support I 0 12 ge Spill tech in camp.Al others in Bartow Ve1co/Gray 1.Tech 1 12 12 Peak tRig Support 15 13 195 Five in camp Ten staying in Barrow Kuukpik Catering lCook/Clean 5 12 80 Alutip IC p Manager 1 12 12 Beacon Medic 1 12 12 - Oasis Sample Catchers 2 12 24 PRA )Ractor OPE)Inspector - - _- PRA DSM 2 12 24 PRA HSE 1 12 12 PRA.. _. Su - __. ESTIMATED TOTAL DAILY LABOR HOURS: 900 Total Personnel In Camp.55 IndMdwM A.•••.•. WALAKPA#11 DAILY DRILLING REPORT 19-Feb-12 S " x Operator Nbe oSlope Borough Project Description Ba Drilling a Well Site Ludlam Stew Hubbard I Joe McInnis _. fir _ ter; �3-1._'--',;, Well Name Welekpe#11 CIP Number 63-090 Cell Phone (907)980-4206 tiy-.r.F API*I AOGCC 50-023-20038-00-00 Land Use Permit NSB Development Pemlp Office Phone (907)771-1002 (PTD#) Rig Accept 13 Feb Q 2400 Rig Contractor Kuukpk Drag,LLD:Ku Date/Time hra ukpk Drirq Rig#5 Property Dpipmtlon Webkpa WellSite Phone (907)771-1021 Rig Release 00:00 Depth 1208•TD Target Depth(test)rkb 5335'MD'2343 ND HSE Phone (907)771-1025 Date/Time (leal)rkb Days on Well 6 CART NU SOPE Operations Neat 24- NU ROPE-Test Same•PU BHA-Rxi to FC-Teat Cog to 2500 PSFOkplece Hours Mud•Dril Out FC/Shoe&20'New Formation-Perform LOT-DM OPERATIONS SUMMARY _ - 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Slee F116•1----1- Hours _.. _.- Dsearipdeet Detail/Rig Up/Rig Daily • Tobl -.._. 0800 Finish pumping cement-land plug with 500 psi inc prey to 1500 pd-hold 5 min-bleed pros g Down 24.0 ( 0700 1.0 off check Ms-Rs holding-CIP at 0645 2 Drilling 32.0 -___- 0700 1000 i- 3.0 Flush/blow down lines RD ant - ----- -- - equip landing ll-LD baba eta-cap tongs 3.Reaming _ 1000 PJSMWRD aborter Nne-ranove rotaryblob-mouse holo-prep cellar for ND Mydril 4.Coring 1200 2.0 •remove standpipe hose-remove chains horn stack-clear/clean cellw for trolley-RU sings 5.Condition and Circulate 55 _ __ __- 1200 1400 2.0 Remo knifeNv-bolls from Hydril 6.Tops 15.0__ F" 1400 1430 0.5 Wash down cellar floor 7.Lubricate Rig 1.0 1430 1630__ 2.0 ND Hydra t -Wash Down 8.Ropes Rig 1.5 1630 I Remo Riser Bolts-Steam 8 Suck Oct Cellar-Rem Ru«-Wash Down Remove G.C/O Drill Line degree Sweepsa/1s 10 Deuetion 2.5 Starter Head-Wash Down Install Screw on Flange-Install 90 w/2 _-_ Valves on Wellhead-Install Companion Flanges-Install Welteed-Pressure Test Same 11.Wireline Log 2400 7.5 'to 5000 PSI for 10 Minutes Install 11"Riser 12.Run Casing and Cement 4.0 18.5 0000 NU Single Gate/Mud Cross-Double Gates B Bag-Install Flow Nipple&Flow Line-Install 13.Wait on Cement _ 0600 6.0 Rotary Table-Tighten all Flanges-Install Chains 14.Nipple up BOP 20.0 43.5 Cement i Mix/pump 40 bbls dual spacer 105ppg-85.2 bbl.Typa'•L••cmt 10.6 ppg-48.2 bbls 15 Test BOP Type••C••crnt 15.6 ppp-Disp wl 10 bbls h2o 77.3 bbls mud with CIP et 0645 hrs. 18.Drill Stem Test _-- 17.PI gback -..- E-B 15 18.Squeeze Cement 4_ 528 bbls received TPA 380/380 10 Fnhng - f _ --- --�--- 20.Directional Work _ ---- J� -- •" « Current Weather • 21.Other 8.5 TOTAL HOURS: 24.0 Temperature.-6 F.-Winds 17 MPH TOTAL HOURS: 24.0 1 148.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(In) MFG TYPE SERIAL NUMBER JETS I DEPTH IN(fl) I DEPTH OUT(ft)I FEET GRADE OUT HRS OBD FT/HR 1 12-1/4 HOBS Mllltoon 1 1 11748526 3161x12 46 1208' 1160' rrwr-n-i-rtNo-rtl 2834 4093 •CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 26.2'RKB CEMENT PROGRAM Seedon OD(in) Weight(ppf) Grade Thread MD(h) TVD(H) Contactor i CIP Type Conarsente Conductor i 16 tlJ L-80 Welded 101.5 1015 Halliburton 28-Dec-11Q03:30 "C"Permafrost TOC at-15'-U4ubed Surface Casing 11 9 5.8' 40 L•80 BTG/I 1.193 1.135 Halliburtoni 18-Feb-12 0845 L&C Return to Surface -. PUIP01 PUMP#2 SPUD MUD FLUID INGREDIENTS Manufacturer Ellis William 'Manufacturer TSM FL Tamp(°F) I- 0 Description To ay ModNi WH-t 000-A ModNTSM7000 Tine 23:59 DESCO CF(sack) Liner Sia(in) _ 5 Liner Sim(in) 8 Wephl 5,50/0.1) f 9.4 ALDACIDE G(5g pail) F. Stroke(in) 10 Stroks� 9 VIS(sacpt) ) -_-.- 37 KCI( k)_- BBL/STK 6 98% 1 0 0583 BBL/ST(Q 96% 0.0755 PV(ep) � - 7 Salt-Solar I. SPM 0 SPM 0 VP(pN700p7) 7 BARACOR 700 GPM 0 GPM 0 ow.(boom) 10/24/34 AQUAGEL(sack) PSI 0 PSI 0 pH 8.8 DEXTRID LT(sack) WELL CONTROL Fantle WL(mL/30 min) 15.6 BARACARB 25(sack) SPR Pump#1 i 21 @ 250 psi SPR Pump#2 20 @ 284 psi Sand(15 by vol) f 25 X-TEND II(bag) SPR Pump#1 29 4 321 psi SPR Pump#2 30 @ 407 psi Saida(%by vol) 7.9 CON DET PREMIX(drum) FIT EMW(ppg) 13.5 LCM(ppb) _ 8ARO1D 41(sank) - DRILL STRING AND HYDRAULICS CI(nglL) 1100 _ SOLIDS CONTR&{:EQUIPMENT AVDP(fps) II 0 AVDC(fps) ' Ce(mgEL) - - 120 Sham, I SWIM. Hours BU Stokes -__}-_.. 0 !WOB(k-Ib) Cate(API 32nd inch) 2/0 Super G 80 7--- Total Strokes 1111 0 RPM PF/MF(ml) 0/.2 Super G 70 7 Pick UP(Ikb) 0 TFA(incl Pit Vol(blob) 50 Sugar G 140 7 Stick Ox(k4b) 0 HHP total Hob(blob) 93 Centrifuge Speed Flours Jet Vol(fps) 0 ldP(5)Bit(psi) i Reserve(blob) 328 Pit 3 Centrifuge 2300 0 BHA 200 Nem Duorlptlon 00 06)_ ID fMf.j_Gauge(M) Top Connection I Length(k) Vendor Cumulative Length UN BRT hour 3 5 ( . 6 9 10 11 12 13 14 • 15 TOTAL BHA LENGTH: MOST RELENT DIRECe1ONAL SURVEYS MD INC AZ TVD eN1S eE/-W VS OLS Calculation , VS Azimuth _... _.. 1071.40 - 27.52 250.05 7040.83 48.245 798.24W 201.54 4.14 , 1733.03 �. 28.53 259.88 1095.23 51.639 224.71 W 230.41 1.75 • 1187.23 I 30.03 259.44 1124.97 54.57 S 241.32 W 247.24 8.17 KUUKPIK RIO 06 DIESEL FUEL TYPE,RECIPENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 16-Feb-12 Customer-1 Vet(gal) Cweo..ora l) Cwmm« Vol(gal) customer I Vol(wD Summary Quantities I Vol(gal) Delivered Today 2,300.0 K ukpk(D) i 2412.0 Tkigeq/Comm(D) 422.0 I S 000-galbn Tank(G) I Total Dined Consumed 200,848.3 On Hand Today 8,850.0 Deka Luse(D) r 300.0 BSS(D) 23 q)aon Tank(D) Total Gasoline Consumed 9841.7 _ _._..- Used Today 2,400_0 Umiaq(D) _2090 GDR(D) 7.0 NSB Equipment(D) I 0.0 Diesel Consumed Today 4,705.0 Used this Wel 65,701.0 Peek(D) 1310.0 .Heliburton(0) 450 BOF(0) 155.0 Gasoline Consumed Today 155.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY � PROJECT HSE SUMMARY Company Paltlon l Count Est Hours I Tole!Hours Nobe Incident Type qday T Comments Kuukpk DrtFng Rig Craw 22 12 264 Illness I 0 Kuukprk DrillingI Tool Pusher 2 12 24 _--_-- _-- Inlury _--I---- -0 - --- _- HES-BSS _ Cementing 3 13 39 I In camp.Six staling in Barrow Spill 0 HES-BSS Mud 2 13 28 Tunda Disturbance 0 __ HES- •- MWD/LWD/DD 4 12 48 Bear Sighting . HES So-ervisor 1 - 13 13 HES supervisor etan Barrow Near Miss - - N g in OBR Casing Crew Umiaq Op Support 8 12 - 96 SpA tech In camp.All others in Barrow Vetco/Gray Tech 2 1224 Peak Rig Support 15 13 165 Five In carnp.Ten staying in BarrowIN Kuukpik Catering Cook/Clean 5 ~ 12 80 Alutiiq Camp Manager 1 12 12 Beacon Medic 1 12 12 Oasis Sample Catchers 2 12 24 PRHOPE Inspector _ __ -- IIIIII•• PRA DSM 2 12 24 PRA HSE 1 12 12 PRA SuperWsor i ESTIMATED TOTAL ONLY LABOR HOURS: $73 Total Personnel in Camp:631ndividwte r ' L` WALAKPA#11 DAILY DRILLING REPORT 20-Feb-12 - 2 - Operator North Slaps Borough Project Description Drillinga all Won Leaders Stew Hubbard/Joe McInnis i y1...., m . Well Nae WaWrpa#11 CIP Number 88-090 Coll Phone (907)98046 20 naL..r•A API(IDOOCC 50023-20038-00-00 Land Use Permit NSB Development Parma Office Phone (907)771-1002 Rig Accept 13 Feb @ 2400 _ Date/Time ire Rig Conk Kuukpik Eking,LLC:KOffinguukpit Offing Rill F5 Property W Designation W kpa Well Site Phone (907)771-1021 Rig Release 08:00 Depth 1201T TO Target Depth(bet)rkb 5335 MD'2343'TVD HSE Phone (907)771-1025 --Date/Time (bag dib Op Days on Well DART Prop to dri oboe track and LOT Howe Ori Ahead Operations Next 26- OPERATIONS SUMMARY 24-HOUR ACTMTY SUMMARY CUMULATIVE ACTIVITY SUMMARY ' SIM Finish Hou Description Detail Daily Tool. .._ 00110 HU mud it.to elond pipe-HU kitchoke and Koomey linesfunction teat same-InsbY 1.Rig Up/Rig Down 24.0 1000 4.09 mud. 2 Drilling 32.0 use hob cwnanuem 1000RU tot tBOPE PU bdlL teal plug and t -MU TIW ontop dove-MU heady 3R g 1200 2 nrfold 8 t t hoes-FS abdt rapbw rap peak t, fill stack 8 manlokl-Teal Gas Ala s 4 Coring 1200 Test Hyd 11 250/2500 PSI Tell @ 250/3500 PSI-Top Rams 2 Demco-Choke Valves- 5 Condition and Ciculab 5.5 Kill Lin Valves-IBOP Manual MOP Dart V -TIW Valve Accumulator Test-Film Rams 8 Tio15.0 Blind Rams HCR-Mnual Choke Lim Valve-Super Choke-Manual Choke-Pit Volume 7.Lubricate Rig 1.0 Alam-Flow Alarm-Pull Test Plug-Install Kelly Hose-Break Out Head Pin-LD Teat Jt- 8.Repair Rig 1.5 1900 7.0 Instal Mouse Hole B.C/O DNI Line 1900 1930 0.5 Lubricate Rig-Greased TD-Blocks-Crown-Pump Up Compensators-Swivel Packing 10.Deviation 2.5 1930 PU 63/4"Sperry Drill Lobe 881/4"Bit-MU Magnetic Spacing Collar-PU MWD-TM-HOC 11.Wireline Lo-ii- 2300 og2300 3.5 Float Sub-Download Data horn MWD 12.Run Casing and Content 4.0 18.5 23002400 1.0 PU Colors-Latch Onto Jars 13.Welt on Cement -.. _. 0000 0100 1.0 Kelly Up&Surface Test BHA @ 400 GPM 14 Nipple up up BOP 20.0 43.5 ._ 0100 0200 � 1.0 TIH WI 8 Stands HWOP 80 Stands DP-TS�1110' 15.Test 0200 0400 2.0 RU To Test 9 5/8"Geeing-Test to 2500 P31 for 30 Minutes_ 16.Drill Stem Test 0400 0430 0.5 RD Test E ent 17.Plugback 0430 0600 1.5 Displace a ud mud to LSND/Beraland mud 18 Squeeze Cement EB-15 19 Fishing Received 252 bbls T/A 400/420 20 Directional Work •••'Current Weather••• 21.Other 6.5 __. TOTAL HOURS: 240 Temperature:-6 F.-W Inds 17 MPH TOTAL HOURS:I 24.0 148.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE in) MFG TYPE _._SERIAL NUMBER I JETS I DEPTH IN(ft) I DEPTH OUT(ft)I FEET I GRADE OUT HRS OBD :.FT/HR 1 12-1/4 + HDBS Millman 11748526 3016-1012 ' 48' 1208' 1160' triol-a-I'L-lto-80 28.34 40.93 CASING AND COMPLETION PROGRAM-ALL ET DEPTHS EASURED FROM MP CEMENT P1 4 - - ROGRAM Section -OD(b) T_Weight(ppq Gads I Thread I MEI(fl) I TVD(ft) _._ Contractor I CIP Typ Comments Conductor 18 84 L-80 I Welded _ 101.5101.5 Halliburton 26-Dec-11 CO 03:30 C Permafrost TOC at-15' U lobed Surface Casing 95/8" 40 L-80 I BTC-M 1,193 f 1.135 Halliburton 1 18 Feb-12_0845 LSC Returns to Surface PUMP#1 PUMP#2 LOW SOLIDS NON-DISPERSED MUD PRO RTIES LOWS6A6 NON-DISPERSED FLUID INGREDIENTS Manufacturer Fibs Williams Manufacturer TSM FL Temp CF) 0 Dasoliptlwr Today T Model WH-1000-A Model 7SM1000 Tone 23:59 DESCO CF(sack) r Si z e -_ Liner Sim(in) 5 LinSizes(in) _ Weight gbdpd) 9 2 _-- ALDACIDE G(Sp pat) Stroke(lo) 10 Stroke(in) 9 VIS(sec/qt) 46 ----KCI(sack) BBL/STK @ 98% 0.0583 BBL/STK @ 96% 0.0755 PV(eD) 16 Salt-Soler SPM 0 ,SPM 0 YP(be/100St 19 BARACOR 700 ----- -------- _ GPM i 0 GPM 0 Gale(be/1 ) 10/12/15 AQUAGEL(sock) PSI 0 PSI 0 pH 7.3 DEXTRID LT(sick) WELL CONTROL -- Fitrale WL(mL/30 min) 7 BARACARB 25(sack) SPR Pump#1 21 @ 250 psi SPR Pump#2 20 r_.284 poi Sand(%by vel) 0 X-TEND II(bag) SPR Pump#1 _' 29 @ 321 p0 SPR Pump#2 30 @ 407 psi Low GrauitySoM.(%by 6 CON DET PREMIX(drum) FIT EMW(PPO) I 14.5 LCM(ppb) - _--- BAROID 41(sack) _ - DRILL STRING AND HYDRAULICS CI(mglL) _ 800 SOLIDS CONTROL EQ IPMENT AVDP(fps) 0 AVDC(fps) r 0 Ca OA) 100 Shaker ' S r ens Hours BU Strokes 0 WOO(k-lb) 0 Cake(API 32nd lath) - 2/0 --- ---Super G o 6 Total Strokes 0 RPM 0 PF/MF(ml) 0/1.8 Super G 0 6 Pick Up(k-lb) 0 TFA lin21 0 PN Vol(bbN) 160 Super G 1 0 6 Slack Off(k-Ib) 0 HHP total 0 Hole(blots) 93 Centrifuge Sp ed Hours _ -- -_---e Jet Vol(fps) 0 dP Q Bit(poi) 0 Reserve(blots) 486 Pd 3 Centrifuge 23 0 0 BHA2 Sero Description Op�jn)-_OAK QPugr.(yr) -_-Top Connection-_-__' Length(ft) Vendor Cumulative Length(ft) BRT hours 4 a 7 8 9 10 11 - 12 13 14 15 TOTAL BHA LENGTH: - MOST RECENT DIRECTIONAL SURVEYS ND 1- ...-INC I..___AZ TVD .N,4aE/-W VS _...j DL8 I_- Calculationbtlr n VB Aaw 1071 40 27.52 259.05 1040.83 48.24 5 196.24 W 201 54 4.14 1133 03 28.53 259.86 1095.2351.53 S 224.71 W 230.41 i 1.75 1187.23 I 30.63 259.44 1124.97 54.57 S 241.32 W 247.24 8.17 1 KUUKPIK RIG ITS DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMAQ REPORT:I 18-Feb-12 Customer Vol(9.1) Customs, i Vd n Customer Vol(gal) Customer i Vol(gal) Summry Quantities Vd(g4Q De --on Daiwred Today 2,300.0 BSS(D) Kuukpit(D) 2220.04S,OOOgaien TankkAG) Total Diced Consumed 254.989.7 On Hand Today 4,875.0 Delta Lease(D) I 400.0 Peak(D) 1180.0 23.0 alien Truk D .1 Total Gaeoine Consumed 11,402.0 �-9 �) __-- Used Today 1,775.0 ''GSR(D) Tikipeq/Conam(0) 287 0 NSB Equipment(D) 0.0 Diesel Consumed Today 4,773.0 Used this Well / 67.471.0 IN.iiyerfon(D) 841 Umiaq(D) .15 0 BCF IC) 245.0 o.seine Consumed Today 245.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY I PROJECT HSE SUMMARY Com3apy I Position I Count_ Eat Hours Total Nonni Nobs Incident Type T• Continents Kuukplk Drilling I Rig Crew 22 12 284 i -- Illness -�- 0 KuukpYt Drilling Tool Pusher 2 12 24 _ Injury 0 HES-BSS Cementing 3 13 39 In camp. S u staying og inBarrow Spill _-_ 0 HES-BSS Mud 2 13 ZO Tunda Disturbance 0 HES-Sperry MWDILWD/OD 4 12 48 Bear sighting 0 HES Supervisor 1 13 13 HES supervisor staying in Barrow Near Mos GBR Casing Crew Umiaq Ops Support 812 98 Spill tech'n camp.All othersBarrow Velco/Gray Tech 1 1 12 12 Peak Rig Support 15 13 195 Five In camp.Ten staying in Brow Kuukpik Catering Cook/Clean 5 12 60 Alutiiq Camp Manager 1 12 12 Beacon Medic 1 12 12 _ Oasis Sample Catchers 2 12 24 PRBOPE Inspector - PRA DSM 2 12 24 PRAA HSE 1 12 12 PRA Supervisor ESTIMATED TOTAL DAILYLABOR HOURS:� 881 Total Personnel in Camp:53 Individuals Mtivviywd. tt ..-' , ./ � Opntor WALAKPA#11 DAILY DRILLING REPORT North Slope Borough • Project Dwuiptlon Barrow Gaell 21-Feb-12 Well Site Loaders Sieve Hubbard/Joe McInnis i _ _ - x W■9 Name Walekpa#11 CW Number 88-090 ' Cell Phone (907)980.4208 o.,,n... our API s I AOGCC 50-023-20038-00-00 Land U.Permit N86 Development Permit OSiea Phone (907)771-1002 (PTD a) Rig Accept 13 Feb @ 2400 Rig Contractor ph KuukDrilling,LLC:Kook*Dram'Rig#5 Dabrtime hra PropartY Dooi9n■tlon walekpa Wall Sita Phew (W7)771-1021 Rig Release 08:00 Depth 2255' Target Depth(feat)rkb 5335'MD'2343'TVD HOE Photos (907)771.1025 Data/Time (foot)rkb Days w Wail 8 DART Ckwleb 8 Condition Hole-Prep Weighted High Vis Operations Next 24 c:onenue to Cndibn Hole-Drill Intermediate Hole Sweep Hours OPERATIONS SUMMARY 24.HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY tibrt T Finish I Home 1 0.suiption Debit Daily Tobi Drill shoe track us 20 new formation to 1228'-Cirn/cond hole 1 0800 0900 3 0 f4 Rip UD/R5 Down ) 24.0 lo wo lines 0 0900 1100 20 i RU Halliburton conduct LOT-blow down lines RD Halliburton 2.Drilling 190 57.0 1100 1200 1.0 Rotate/slide from 1208'[0 1275' 3.Reaming 1200 2400 12 0 1 Dill nom 1275'l0 2038' 4 Coring _ 0000 0400 4.0 Drill fro 2038'l0 2285' S.Condition and Circulate 5.0 10.5 0400 0600 2.0 Condition 8 Circulate due to ECD'a 8 Shakers Loading Up-Prep High To Sweep 6 Trips I ) 15.0 7.Lubricate Rig 1.0 _- 8 Repair Rig 1.5 -- '' 9.C/O Drill Line __ -____-- - UP Wt 54 K 10 Deviation 2.5 ON Wt 47K 11.Wireline Log •RT W1 50 K 12.Run Casing and Cement 16.5 -.. _._. - --_ 13.Wail on Cement 1 _ 14.Nipple up BOP _ 43.5 1 15.Test BOP •_ 18.Ddl Stem Test LOT-EMW 18.4 ppg --_- 17.Runback 18 Squeeze Conant EB-15 19 Fishing Received 252 blots T/A 400/420 20 Directional Work - "'Current Weather'•• 21.Other • I. 8.5 TOTAL HOURS: 24.0 Temperature.-6 F.-W Inds 17 MPH TOTAL HOURS: 24.0 I 172.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER I SIZE(in) MFG TYPE I SERIAL NUMBER JETS DEPTH IN(ft) ,DEPTH OUT(ft) FEET GRADE OUT HRS OBD 1 FT/HR 12-1/4 HOBS Mlltaolh 11748526 3x16-1x12 48' 1206' 1180' 1-1-VO-A.1-8.8,0 28.34 I 40.93 2 8-112 HDBS FX 25^b FOC 5013668 5x13 1208 n ) CASING AND COMPLETIO N MOOR/WI--ALL SET DEPTHS MEASURED FROM 25.2'RKB CEMENT PROORAY Section OD(in) WN9IR(ppf) Grade Thread ND(ft) TVD(ft) Contractor CIP I Typo Comen Conductor 16 84 8l, Weldedurton� 1 101.5 101.5 Hallib26-Dec-11 @ 03.30 -C-Permafrost mt r.- TOG al-15'-U-tubed Surface CasMg <J 58" 40 L-80 BTC-M 1.193 1.135 Halliburton 18-Feb-12@0645 L 8 C Returns to Surface PUMP#1 PUMP#2 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer Ellis Wiliam Manufacturer TSM FL Temp(°F) _I 70 Description Today Model WH-1000-A Model TSM1000 Time 23.59 DESCO CF(sack) 0 Liner Size(In) 5 Liner Sim(n) 6 Weight(Ibdgel) 9.35_-- ALDACIDE G(Sg pail) 0 StrokTK 10 Stroke On) 9 PV(cp)sec/gl) 50 --- Sodium Bicarbonate Beck , 4 BBL/STK @ 96% 0.0563 BBL/STK�96% 0.0755 PV (sack) SPM 73 SPM 85 YP(Ibs/10o8v) 19 XC 207(jug) 3 GPM 179 �'.GPM _. 270 Gels(Ibs/100itt) 7/10/13 BARAZAN D o(sack) 32 PSI 1384 PSI 1384 pH 10.8 DEXTRID LT(sack) 38 WELL CONTROL Filtrate WL(mL/30 min) 8.5 PAC-L(sack) 30 SPR Pump 01 21 @ 250 psi •SPR Pump#2 20 @ 284 psi Sand(%by vol) 25 Citric Acid(sack) F 6 SPR Pump#1 29 @ 321 psi SPR Pump#2 30 @ 407 psi Low GraailySolids(%byM 1.8 CON DET PREMIX(drum) 0 FIT EMW(ppg) 14.5 LCM(ppb) BAROID41(sack) 560 DRILL STRING AND HYDRAULICS CI(mg/L) 800 SOLIDS CONTROL EQUIPMENT AVDP(fp) l 169 -_- - IAVDC(fps) 310 Ce 1.011-) 320 Shaker SCIeeM Hours BU Strokes 1,720 WOB(k-lb) 9 Cake(API 32nd inch) 1 Super G 80 21 Total Strokes 6.518 RPM 0 PF/MF(ml) 1/1 6 Super G _ 70 21 Pick Up(k-lb) 0 z 0.648 Pd Vol bble 306 Su G ( ) TFA fin') ( ) per 140 21 --_ Slack Off(k-Ib) 0 HHP total 2 Hole(blots) 134 CentrifugeStudHours Jet Vel{fps) 221 dP @Bit{ps) 409 Reserve(blots) 175 Rt 3 Centrifuge2300 4 BHA 300 Nem Ir DaseNption OD(in) ID(in) Gage(in)i Top Connection Length(k) Vendor Cumulative Length(fly BRThoun 1 HDBS FX 2528 PDC 7.000 2 250 8.500 P 4-1/2 REG 1.01 1.01 2 6-3/4 Sp N ryOLobe 8/7.5.0 s1g 6.750 4 498 B 4-1/2 IF 27.21 28.22 3 I Magnetic Spacing Colo 6.720 ' 2.250 B 4-1/2 IF 9.21 37.43 -_-- - 4 Gamma 5.740 1.920 B 41/21F 8.35 45.78 5 Smart Stabilizer 8.750 1.920 8.375 B 4-1/2 IF 1.95 47.73 8 RM/PWD/HCIM 6.750 1.920 B4-1/21F 23.37 71.10 7 83/4 DM Collar 6.750 9.125 94-1/21F 9.20 80.30 8 TM HOC 6.500 _ 1.920 B 41/2 IF 9.98 9.28 9 Float Sub 6.688 2.875 B 4-1/2 IF 2.41 92.87 10 NM Flex Collar 6.813 3000 B 4-1/2 IF 31.09 123.78 11 NM Flax Collar I 8.500 2.875 B4-1/21F 30.83 _ 150.90 12 NM Flex Collar '. 8.812 2.875 84-1/2 IF 31.08 185.47 13 4-1/2 XHBx4-1/2 IF P 8.1682.583 84-1/2 XH 2.82 188.00 14 Weatherford Hyd DA Jar 6.500 12.500 B 4-1/2 XH 31.51 210.80 15 XT-39B s 4-1/2 XH B ' 8.000 2.500 B4 Mod 2.62 222.22 11; 17 04X1-38 HWDP 4000 2.563 XT-39 525.84 TOTAL BHA LENGTH: 74806 748.08 MOST RECENT DIRECTIONAL SURVEYS MD INC AZi ND 1 cN/-S aE/-W I VS as Calculation VS Azimuth 1999.04 57.35 25810 1730.04 186.335 78874W 805.54 _ 9.73 2061.20 ----- 59.09 256.77 1762 78 180.725 840 11W 858.37 2.95 2124.91 61.63 256.95 1794.28 193.318 894.03W ' 913.71 : 3.99 QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:! 18-Feb-12 Customer K RIG#5 DIES a Voll ) Customer Vol(gal)Tl .RECIPIENT,Customer Vol(gall Customer I Vol(gal) Summary Quantities Vol(gal) Delivered Today 20.000.0 BSS(D) Kuukplk(D) 196.0 5,000-gallon Tank(G) Total Diesel Consumed 261,881.7 . On Hand Today 4,6500 Delta Lease(D) 200.0 I Peak(D) 1963.0 23,000-gallon Tank(D) Total Gasoline Consumed 12045.0 Used Today .2,225.0 'GBR(D) I TikigeglConam(D) 629.0 NSB Equipment(D) 0.0 Diesel Consumed Today 3451.0 Used this Well 89,701.0 !Halliburton(D) 377 I Umiaq(D) 86.0 BGF(G) 199.0 Gasoline Consumed Today 199.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company I Po.Nbn _I Count Est Hours I Total Hours Nobs Incident Type Today Comment Kuukpi Drilling_--I Rig Crew 22 12 254 Mass 0 Kuukp k Dril4ng_-. Tool Pusher 1 2 12 24 Injury 0 HES BSS Cementing --- 3 13 39 In amp.Sox staying in Brow _ - SO 0 I - -- - HES tarok' Mud 2 13 28 Tend.Disturbance 0 HES Sperry MWDAWD/DD 4 a 12 48 BaSighting 0 rvisor 1 13 13 HES supervisor HES Supe _ _ . su le Barrow Nee Miss -.-- staying In GBR _ Casing Crew Umiaq Ops Support 8 12 96 Spill tech in camp.Al others In Barrow Vetco/Grey Tech 1 12 12 Peck RA Support 15 13 106 Five in temp.Ten staying in Barrow Kuukplk Catering Cook/Clean 5 12 60 Alutlq Camp Manager 1 ...-.12 12 Beacon _Matic 1 - 12 12 --- - Oasis Sample Catchers 2 12 24 AOGCC ROPE Inspector - `--- I PRADSM 2 ' 12 24 PRA _ HSE 1 1 12 12 PRA Geologist 1 12 12 _ ESTIMATED TOTAL DAILY LABOR HOURS: 973 Toorsw Iola'Penel MM Camp:84Indduals Al - r itM. WALAKPA#11 DAILY DRILLING REPORT 22-Feb-12 "�'" Barrow ng II �'i Operator North Slope Borough Project GsaHpdon Drilling F Well Mb Leaden Slew Hubbard/Joe McInnis 1p , Well Name W.Iakpa 811 CIP Number 68-000 Cell Phone (907)980.4206 APIS,I AOOCC 50-023-20038-00-00 Land Use Permit NSB Development Pen. Office Phone (907)771.1002 _ (PTD t) Rig Accept 13 Feb @ 2400 Rig Contractor Kuukpik Ming,LLC:Kuukpik Doting Rip#5 Property Dignation Wabkpe Well Site Phone (907)771-1021 Date/Time bre Rip Release 06:96 Depth 3426'Intermediate TD ---Target Depth(feet)rib 5335'MD'2343'TVD NOE Phone (907)771-1025 Date/Time 007)771.1025DablTime (feet)Hhb Day.on Well 0 OART I Canditronirg Hole Operations Next 24- Condition Hole/RU to Run 7"Cog and Cmt Same Hours OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start ---Finish Hours '' Description Detail I pally Tobi 0600 1200 6.0 Rotate and Slide 2285'to 2585' 1 Rig Up/Rip Down 24.0 1200 2400 12.0 Rotate and Slide 2585'3281' 2.Drilling 27.5 72.5 0000 0230 25 Rotate and Slide 3281'-3404' 3.Reaming 0230 0400 1.5 Circulate&Condition while verification of TD 4.Coring 0400 0430 0.5 Rotate and Slide from 3404'l0 3428' S Condition end Circulate 2.5 13.0 -.._ . 0430 0600 1.5 Circulate 8 Condition Hole w/High Vis Sweep Prior to POOH to Shoe for short trip 8.Trips 15.0 • 7 Lubricate bricate Rig1.0 8.Repair Rip 1.5 ' - 9.C/O Drill Line -- UP Wt 54 K _ _.. 10.Deviation _-.. 2.5 _. DN Wt 47K -.._ _... 17 Wireline Lop 'RT WI 50K 12.Run Casing and Cement 18.5 13.Waft on Cement 14 Nipple up BOP 43.5 15.Test BOP_. ---__ 16.Drill Stem Test - -- -- -- -- 17.Plugback 18.Squeeze Cement _-._ EB-15 19.Fishing Injected-1254bblsatrentWe5hepsi-SI T/A 600M00 20.DOther nal Work ^'-Current Weather... 21.ower 8.5 TOTAL HOURS: 24.0 Temperature;-12 F.-Winds 10 MPH TOTAL HOURS:I 24.0 108.0 DRILLING AND COMPLETION INFORMATION BR NUMBER SIZE(in) MEG TYPE 1, ) SERIAL NUMBER JETS I DEPTH IN(ft) :DEPTH OUT(e)I FEET GRADE OUT HRS OBD j FT/HR 1 12-1/4 HDBS M,Iltoom 11748526 3x16-1x12 48' 1208' 1760' 1-1-w T44-La-No-iD 28.34 40.83 2 8-1/2 HDBS FX 2526 PDC 5013668 5x13 1208 CASINO AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 262 RKB CEMENT PAOGRAM Bastian- -0011n) I Weight Mpg Grad. thread I MD(ft) TVo(fy Contractor ...( CIP I Ttme i cum is -- Conductor 18 _ 84 L-80 _Welded 101.5 101.5__ _HaNburlon r 26-Dec-11@03:30 {I -C-Pennafroat TOC at-I5' Ulbed Surface Casing r 95/8" . 40 i L-80 BTC M I 1,1.93 1,135 Halliburton 1 18-Feb-12 @ 0845 L&C Returns to Surface PUMPIII PUMPS/2 LOIkSOLIDS NON-DISPERSED MUD PROPERTIES LOW SkLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer /Elks Wilma Manufacturer TSM FL Temp(F) 76 Deeerip8on Today Mudd -1 WH-1000-A Model TSM1000 Time 23:59 DESCO CF(sack) , Liner Size(in) 5 Liner Sias(ir) 6 Weight(6dpal) 0.55 ALDACIDEG(59 pail) 4 Stroke(n) 10 Shrike(in) 9 VIS(sec/qt) 52 -_- KCI(sack) 0 BBL/STK_@96% I 0.0583 BBL/STK Q96% 00755 PV(.P) 15 Sodium Bicarbonate(sack) 2 SPM 1 98 SPM 74 ITAL./100e) 19 BARO-TROL PLUS(sack) 24 GPM 240 GPM 235 GdsSbW00112) 10/12/15 BARAZAN D•(sack) 0 PSI 2121 PSI 2121 pH 0 DEXTRID LT(sack) 11 (sack) 10 _- WELL CONTROL Filtrate min rata WL(mL/30 ) 5.9 PAC1(sackZ 10 SPR Pump 01 21 @ 250 psi SPR Pump 02 20 @ 284 psi Sand(%by vol) 25 Cbb Mid(sack) 2 SPR Pump 81 29 @ 321 psi SPR Pump 02 30 @ 407 psi Low Gravily5olids(%by or 2.8 CON DET PREMIX(drum) 0 - 1 --_- -_ FIT EMW(ppg) - 14.6 _ LGM(ppb) BAROID 47(sack) 115 I DRILL STRING AND HYDRAULICS CI(mg/L) 800 SOLIDS CONTROL EQUIPMENT AVDP(fps) 179 AVDC(fps) 328 Ca(mg/Li 20 Shaker Screens Hours. _-_.. BU Strokes Z888 WOB(k-Ib) 1 10 Cake(API 32nd inch) 1 Supper G 80 24 Total Strokes 8,013 RPM 0 PF/MF(ml) 0/1.8 Super G 70 24 Pick Up(k-Ib) 0 TFA lin') 0.648 Pk Vol(bbls) 308 Super G 140 24 Slack Off(k-lb) 0 HHP total 2 Hob(blots) 220 Centrifuge ',Mod- Herts -- __.-- ----- - - _-__.__----. Jet Vel(fps) 234 dP @ Bit(Psi) r 488 Reserve(blots) 121 Pd 3 Cenuiluya 2300 24 BHA 300 it.m Description i OD(In) L.IAN Gauge((n)J Top Connection Len 1fq IVendor( Cumulative Length(11) BRTBan 1 HDBS FX 2526 PDC 7.000 2.250 8.500 P 41/2 REG 101 101 2 6-3/4 SperryDril Lobe 6/7-5.0 sig 6.750 4.408 B 4-1/2 IF 27.21 28.22 3 Magnetic Spacing Color 6.720 2.250 1 B 4-1/2 IF 9.21 37.43 4 Gamma _-- l 6.740 1.920 64-1/2/F 8.35 45.78 --- 5 Smart Stabilizer 1 6.750 1.920 8.375 B 41/2 IF 1.95 -- - 47.73 -- - _ 6 Res/PWD/HCIM 6.750 1.820 B 4-1/2 IF 23.37 71.10 7 63/4 DM Collar 6.750 3.125 B4-1/2 IF 9.20 , 80.30 8 STM HOC 6.500 1.920 B41/21F 9.96 8.28 9 Float Sub 6.688 2.875 B 4-1/21F 2.41 92.67 10 NM Flex Collar 6.813 3.000 1341/2 IF 31.09 123.78 11 'NM Flex Collar6.500 '. 2.875 B41/21F 30.63 ) 154.39 - 12 NM Flex Collar I 6.812 2.875 _ 84-1/2 IF 31.08 18547 - 13 4-1/2 OH 13x4-1/21F P ----- 6.188 2.563 . 841/2 XH 2.82 188.09 -- 14 Weatherford Hyd Drlg Jar 6.500 2.500 ' 134-1/2 XH 31.51 219.60 15 XT-39B x4-1/2 XH B 6.000 2.500 B4 Mod 2.62 222.22 16 17 x 4 XT-39 H W DP 4.000 2.583 XT-38 525.84 TOTAL BHA LENGTH: 748.00 748.06 MOST RECENT DIRECTIONAL SURVEYS _ MD INC AZ TVD •N/S •E/-W Calculation - VS OLS - VS Azimuth 3284.31 72 01 _258.82 2218.08 425.020 1925.420 197005 4.73 9328.98 75.09 I 260.84 2230.39 435.980 1986.46w 2031.66 5.83 3350.73 76.31 287.70 2247.78 439.270 2007.27w 2052.83 5.73 I KUUKPIK RIO 95 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 20-Feb-12 __--_ - _._ -_ Customer - ---------- _- - Customer Vol(gal) Customer I Vol(gall Customer Vol(gal) f Customer I ya_(geg--- Summary Quantities valg•11 Delivered Today 2,700.0 BSS(0) Kuukpik(D) 2212.0 5.000-gallon Tank(G) Total Diesel Consumed _ 281591.7 • On Hand Today 4,550.0 Delta Lease I0I 200 0 Peak(D) 1470.0 23,000-gallon Tank(D) Total Gasoline Consumed 12.5160 0 Used Today 2,800.0 GBR(0) Teigaq/Conam(D) 694.0 NSB Equipment(D) _ 00 Diesel Consumed Today • 56270 Used this Well 72,501.0 Hallburlon(5) 717 Umiaq(0) 334.0 BGF(G) 4740 Gasoline Cansurned Today 4740 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company I Position Count Est RoomTotal Hours Nobe _ bekbnt Type, Today ConsneM Kuukpik Drilling Rig Crew 22 12 264 Moms 0 -_ Kuukpik Drilling Tool Pusher _ 2 12 24 Injury 0 HES-BSS .Tool 3 13 39 In camp.Six slaying in Barrow SDI 0 HES-Baroid .Mud _ 13 26 Tondo Olebrbencos 0 HES-Sperry IMWDAWD/DD 4 12 48 Bear Sighting _ 0 HES �So- -- 1 13 13 HES supervisor slaying in Barrow Near Misa GBR !Casing Crew 2 12 24 Slaying at B 8 B Umiaq 'Ops Support e 12 SO Spill tech in camp.All others in Barrow Vetco/Gray Tech 1 12 12 Peak Rig Support 15 19 195 Five in camp.Ten staying In Barrow Kuukpik Catering Cook/Clean 5 12 00 Abliq Camp Manager 1 12 12 Beacon Medic 1 12 12 Oasis ',Sample Catchers 2 12 24 AOGCC BODE Inspector PRA DSM 2 12 24 PRA HSE 1 12 12 PRA Geologist 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 909 Total Personnel in Camp:54 Individuals Mk-kw WALAKPA#11 DAILY DRILLING REPORT - 23-Feb-12 ,5is;i, Y . Barrow Otts < 1,-- - Operator North Slope Borough Project Description DI AO I War SIB M Loaders Don Breeden/Thor KaYad '''o..---±a. Well Name W Wkpe#11 CIP Number 68-090 Cell Phone (907)980-4206 '''........1"'" 50-023-20038-00-00#I AOOCC 50,023.20038.00.00 Land Use Perm& NSB Development Permit Mos Phone (907)771-1002 (PTD 8) Rio Accept 13 Feb 2400 Ria Contractor Kuukpk Drilling,LLC:Kuukpil Drilling Rig 85 Property Designation Wslakp. Well Sib Phone (907)771-1021 Date/Time tam Rig Release 08:00 Depth 3,420 Intwmediab wain poled Target Depth(bet)db 5,335 MD 2,343 TVD HSE Phar (007)771-1025 Date/Time r (btkb Days on Well 10 OART POOH.Al 0 AM,preparing L/D BHA OpNut 2M b POOH.L/D BHA.Run,land,end cement r intermediate casing Hours OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start Finish I Hours 1 Description -coop- Detail • Daily I_ Total. 06D0 Monitor well.POOH.13ardlreom and pump from 3,150'to 2,078'.Circulate a5 1 Rig Up I Rig Down part-_ 12:00 8.0 needed for shakers b handle solMs 2 Dolling 72.0 __--_ __. arta_. ort--_.-- 12:00 . 15:30 3.5 POOH from 2,078'b shoe 3 Reaming drive v _--. 15:30 18:00 I 0.5 Service top 4.Coring 16:00 I RIH one stand.CBU.Stage up to drilling pump rate.RIH three stands.Hit clay 5 Cndltion and Circulate 5.5 18.5 17:00 1.0 stringers.COO 6 Tips 17.5 38.0 17:00 20:30 3.5 i RIH 10 3425' 7 Lubricate Rig 0.5 2.0 cart 'Condition 20:30 23:00 2.5 Condit n mud.Circulate and build a Repair Rig 1.5 . sweep 23:00 • 0:00 1.0 �Pump 37 bbl high Ha/weighledst'ae0 x1500 qpm 0.0/0 Drill Line _- -cart-_ 0:00 1:00 1.0 Condition mud and circular 10.Deviator 3.5 _ - 1:00 5.00 4.0 Monitor well.POOH from 9,425'b shoe.No noteworthy dreg.Good trip out 11.Wireline Log arta _.. __.. 5:00 : 5:30 0.5 Monitor well at shoe 12.Run Casing and Content 16.5 arta-_ 5:30 8:00 0.5 'POOH from shoe at 1,194'b 994' 13.Wart on Cement 14 Nipple up BOP 49.5 L; 15.Teat BOP 9.0 _ _.. ._arta _aorto "'EB•10 Update"' 10.Drill Stem Teel a8a Approximate volumes on hand:196 beds wart,150 lobis diesel,1,484 wast fluid 17.PWgback Tubing and annulus Draeaues are both-550 psi 18.Squeeze Cement - - 19.Fishing -. �- 11'Current Weather 111 20.Directional Work ._poop part Temperature.-12 F.Winds variable-8 MPH 21.Other '- 0.5 11.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 218.0 DRILLING AND COMPLETION INFORMATION _-BIT NUMBER SIZEn) MFG TYPE SERIAL NUMBER () ()JETS DEPTH IN ft DEPTH OUT h FEET GRADE OUT HRS OBD FT/HR 1 121/4 HDBS M,lllodh 11748526 - 3616-1012 48 1208 1160 � 28.34 40.93 2 8 112HDBS FX 2526 PDC 5013868 I 5x13 I-- 1208 3426 2218 l s-x-I-NU-0 20.23 • 109.64 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 28.2'axe CEMENT PROGRAM Section OD(in) 0 (Weight ppf) Grade Thread MD(hType) TVD(ft) Contractor CIP Comments COnduclor 16 84 L-80 Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03:30 "C"Permafrost TOC at-15'-LI-tubed Surface Casing 9 5/8 40 L-80 BTC-M 1,193 1,135 Halliburton 18-Feb-12 @ 0645 L 8 C Returns to Surface I • PUMP#1 PUMP/12 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer Els Williams Manufacturer TSM FL Temp('F) 56 Description Today part. __... ModelwH-1000-A Model TSM1000 Time 23:59 DESCO CF(sack) 0 - - _.port _--- Leer film(in) 5 Liner Size(in) 6 Weight(lbs/gal) 9.9 ALDACIDEG(5g pail) 0 I. Streit.On) 10 Stroke On) 9 VIS(sec/qt) 52 KCI( ck) 0 BBL/STK 98% 0.0583 BBL/STK @ 96% 0.0755 PV(cp) 19 SodiumBicarbonate(sack) 0 SPM 98 ASPM 74 YP(Iba/1008') 20 _ BARO-TROL PLUS(wok) 12 GPM 240 GPO 235 Gels(llbs/100f1T) 9/10/14 BARAZAN D n(sack) 3 PSI 2121 PSI 2121 pH 9.1 DEXTRID LT(sack) 5 WELL CONTROL Filtrate WL(mL/30 min)' 5.5 PAC-L Muck) 6 SPR Pump#t 34 @ 191 psi SPR Pump#2 Sand(%by vol) 0.25 Citric Acid(sack) 0 part_ _ _ --- SPR Pump#1 30 @ 216 psi SPR Pump 82 Solids(%by vol) 8.4 CON DET PREMIX(drum) 0 FIT EMW(ppg) 145 LCM(ppb) 0 _ BAROID 41(each) 230 DRILL STRING AND HYDRAULICS CI(mSbp/L) 800 LIDS CONTROL EQUIPME VT AVDP(fps) 190 AVDC Mips) 349 Co(mplL) 40 Shaker Screens Hours _ port_ Annulus(bbl.) 203 WOB(k-lb) 0 Cake(API 32nd 2 Super G-70,8080 3 24 port __ port- Pipe(bbl.) 33 RPM 0 PF/MF(m0 0.1/1.1 SuperG-120,700,700 3 24 Pick Up(krb) 57 TEA fin') 0 648 Pit Vol(bbl.) 309 Super G-140,140 140 - 3 24 Slack Off(k-Ib) 46 dP System(psi) 2282 Hole(bbl.) 238 Centrifuge Speed --Noxa Jet Val(fps) 249 i.dP @ Bit(psi) 548 Reserve(bbla) 132 Pit 3 Centrifuge 2300 I 18 _ BHA 300 !tern a_-- _.- Description I OD(in) r ID(in) Gauge(in) Top Connection Length(fh Vendor -_ Cumulative Length((t) BRTurs hoarta. 1 HDBS FX 2526 PDC 7.000 2.250 8.500 P 4-1/2 REG 1.01 1.01 _part _part. -cart arta__- _-_ 2 8-3/4 SpenyOnl Lobe 6/7-5.0 sig 41/2 IF 27.21 28.22 p-coin. 6.750 4.498 B _- - _- 3 Magnetic Spacing Collar 0.720 2.250 B 4-1/2 IF 9.21 37.43 4 Gemma --- _ - 6.740 1.920 84-1/2 IF 8.35 45.78 5 Smed Ste --_ -Stabilizer 0.750 1.920 8.375 841/21F 7.95 47.73 __. 6 Res/PWD/HCIM 6.750 1.920 84121E 23.37 71.10 7 8 3/4 DM Calc 6.750 3.125 B 4-1/2 IF 9.20 80.30 ._. - 8 TM HOC 8.500 1.920 8 4-1/2 IF 0.0080.28 -._ 9 Float Sub 0.888 2.875 841/2 IF 2.47 92.87 10 NM FI.e Color 6.813 3000 84-1/2 IF 31.09 123.76 _..-..._...__-_. 11 NM Flu Coln 6.500 2.875 B 4-1/2 IF 90A9 154.39 12 ,NM Flex Coed 6.812 2.875 B41/21F 31.08 185.47 13 4-1/2 XHBe4-12 IF P 6.188 2.563 841/2 XH 2.62 188.09 14 W ealharrrd Hyd Drip JY 6.500_._ 2.500 B 4-112 XH 31.57 219.00 15 XT-39B z 4-1/2 XH B 8.000 1 2.500 84-Mod 2 82 222.22 16 170407-39 HWDP 4.01X1 2.563 XT-39 525.84 748.08 • arta_._ __ __._...._.. TOTAL BHA LENGTH:i 748.08 MOST RECENT DIRECTIONAL SURVEYS MD INC AZ I TVD eN/-S ' eE/-W VS DLS Cak:ur8on VS Azimuth 3264.31 72.01 258.82 2218 06 -425.02 -1925.42 1970.05 4.73 Minimum Curvature 255.16 ._-_ -_ 3328.98 75 09 260 84 2136 35 -435.96 -1986 46 2091.80 5.83 Minimum Curvature 255.18 3350.73 r 76.31 28110 22x176 43927 -200]2] 2052.833 5.73 Minimum Curvature 255.16 KUUKPIK RIG 05 DIESEL I FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:: 21-Feb-12 Customer Vol l( I Customer Vol(gal) Customer Vol 1080 Customer I Vol(gal) Summary QuantitiesVol(gal) Delivered Today 2,748.0 OSS(D) Kuukpik(D) 3221.0 5 OOOyalbn Tank(0) i Total Diesel Consumed 270.498.0 On Hand Today 5,000.0 Della Lease(0) 200 1 'Peak(D) 1997.2 .23,00 ion Tank(D) Total Gasoline Consumed I 12,164.0 . -- m) '__.57 � port__- nee d -._. Used Today 2,288.0 GBR(0) Tikigaq/Coram(D) 574.0 NSB Equipment(D) Diesel Consumed Today 6,430 3 Used this Wel 18,448.0 :Halliburton(D) 165.1 U r eq(D) 272.3 BOF(G) 288.0 Gasoline Consumed Today 288.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY _ PROJECT HSESUMMARY Com Position Count I Est Hours Total Hours' Nobs incident Type T Comments Company I portcoop arta poop _-_ Qday.- _._ Kuukphk Drilling Rig Crew 21 12 252Illness 0 Kuukp k Drilling Tool Pusher 2 12 24 I Injury 0 arta ls __part_ _.. _.port_ HES-83S Cementing 9 13 117 Three in camp.Six staking in Barrow Spill 0 arta_ HES-Baroid Mud 2 13 20 Tunde Disturbance 0 HES-Sperry MWDILWD/DD 4 12 b Baer Sighting 0 HES :Supervisor 2 13 26 Change out.HES superNwr W)i g In Bartow Neer Abe 0 GBR Casing Crew 2 12 24 Stating el B B B Umtaq Ops Support 8 12 00 Spr tech in camp.Al otlhas it Barrow Vetco/Grey Tech 1 12 12 - _- - Pule R19 Support 37 13 403 Fete in camp. mp.28 staying in Barrow Kuukpic Catarina Cook/Clean 5 12 60 AIutiq Camp Manager 1 12 12 ._port arta. Beacon Meda 1 12 12 OasisI Sample Catcher 2 12 24 PRA- Cones Super 1 12 12 Shying n Be.. PRAiOSM 2 12 24 PRAMSE 1 12 12 PRA Geologist 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 1208 Total Personnel in Camp:53 Individuals A"'-"" -,,,y1•F,,„,, WALAKPA#11 DAILY DRILLING REPORT • 24-Feb-12 0 Operator North Slope Borou h Bartow Gas N 9 Project Deaerlptlon Dlinq F yWN 81le Ludas Don Breeden/Thor Kafieatad •'`y .- Well Name Walakpa 011 CIP Number 88-090 Cell Phone (907)1980.4208 �Mir,n API 0/AOOCC 50-023.20038.0000 Land U..Permit NSB Development Permit OM.Phone (907)771-1002 (PTD it) Rig Accept 19 Feb M 2400 Rig Contractor Kuukpik Dring,LLC:Kuukplo Drinq Rig 05 property D.egn.Beo W.4ke. W.N Site Phone (907)771.1021 Date/Time Ma Rig R.le.e. MOO Depth 9.428 MD-2,259 ND 7 Date/Now ( rhb argot Depth Nowt)rkb 5,335 MD 2,949 ND HSE Phar. (907)771-1025 Days on W.N -�_--11 DART ---Riggingdown cement ger J Opersears Neat 24- R/D cement ger.Perform ROPE bele.P/U preducbon hole BHA.RIH.C IT to Hours 2,500 pd.DWI shoe back and 20'open hole.FIT to 13 ppg.Swap mud OPERATIONS SUMMARY • 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Wart Finish I .Houle--- Description DaaN Daily total 8:00 7:00 1.0 POOH 1 Rig Up/Rig Down 7:0011:30 4.5 W BHA,download smart tools,clean rig floor 2 Drilling 72.0 AJ 7'test - - -__ 11:30--__ 12:00 0 0.5 PM ct joint W pull bushing 3.Reaming 12:0 1 :0----_ mer ---_-_. 0 11:00 2.0 C/O top e,to 7-,put wear ring.Matra up and sol lest plug 4.Coring 0--_ - 30-_--_ _ Slowdown- - 14:00 15:30 1.5 CTed 7-(oma to 250/3500.Pul test plug.UD test joint. choke S.Condition and Circulate 18.5 15:30 18:30 1.0 i R/U to run 7-casing.Clean floor _ 8.Tripe 38.0 18:30 17:30 1.0 jPILI landing joint and make dumeiy_run w0r.eg.r -_ 7.Lubricate Rig 2.0 17:30 20:30----- 3.0 'RIM w/7-000n Io 1,170'--- _ B.Repair Rig 1.5 20:30 21:00 0.5 I Cell shoe 3bpm and 115)pd 9.C/O Drill Line 21:00 2:30 5.5 RIH w/7'camp to bosom and circulate.Land hanger in wellhead 10.Deviation 3.5 2:30 - R/0 casing running tools and RAJ to cement teem 11.Maine 2:30 5:00 2.5 9 _ Log 5:00 8:00 1.0 i Cement casing.-Plug bumped.Floats held.CIP at 06.00 12.Run Casing and Cement 18.5 ... 13.Wait on Cement ..- - 14.Nipple up BOP 43.5 "'AOGCC Update"' 15.Ted BOP 9.0 AOGCC was notified yeaterduwed like to perform the BOPS test due Sunday this 18.Del Sten Ted aftemoon/evenng so we won't have to test after drillim out. 17.Plugbsek y_ Bob Noble concurred and waived witness 18 Squeeze Cement 80-15 Update"' ---_- 19 Fishing -_- Approximate volumes on hand 198 blots wet 150 blots diesel,1,682 wade fluid 20 Directional Work -- "'Current Weather"' ---- 21.Other 11.5 TOTAL HOURS: 24.0 Temperature:-25 F.Winds variable-10 MPH TOTAL HOURS: 0.0 216.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG I TYPE SERIAL NUMBER I JETS DEPTH IN(ft) [DEPTH OUT(k)', FEET GRADE OUT I HRS OBD i FT/HR 1 12114 HDBS Milltooth 11748526 3x16-1012 48 1208 1160 .w l•n.l-I-rv0.10 28.34 40.93 2 81/2 HDBS FX2526 PDC 5013668 5013 ' 1208 3426 2218 - 0-t-GT.5,444,r0 20.23 109.64 ' CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 28.2'RKB CEMENT PROGRAM Section OD(in) ' Weight(ppfl i Grade Thread MD(ft) TVD(k) Contractor 'I, CIP 1 Type Comments Conductor 16 84 L-80 Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03'.30 "C"Permafrost TOC at-15'-U-tubed Surface Casing 95/8 40 L-80 BTC-M 1,193 1.135 Halliburton 18-1:66-12 @ 06.45 L&C Returns to Surface Int Casing 7 26 L-80 BTC-M I 3,415 ' Halliburton 24-Feb-12@ 06 00 G ! Plug bumped PUMP • f 01 1 PUMP 02 LOWSOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer I Ellis Williams Manufacturer 'I TOM FL Temp CF) 88 Description Today • Model WH-1000-A Model TSM1000 Time 23.00 AQUAGEL(sack) 30 Liner Size(in) 5 Liner Size(in) 6 Weight(lbs/gal) 9.9 ALDACIDE G(Sg pall) 0 Stroke(in) 10 !Stroke(int 9 VIS(ser../qt) 58 KCI(sack) 0 BBL/STK @ 96% 0.0583 BBL/STK @ 96% 0 0755 PV(cp) 20 Sodium Bicarbonate(sack) 0 SPM 0 SPM 0 W lbs/1)r- 21 BARO TROL PLUS(sack) 13 GPM 0 GPM 0 Gals(ba/1r r' 0/13/14 BARAZAN D+( ck) 2 -- __-_ -- PSI 0 PSI 0 pH 91 DEXTRID LT(sack) - 7 _ WELL CONTROL Filtrate WL(mL/30 ren) 8 PAC-L(sack) 8 SPR Pump 01 TSPR Pump 02 Sand(%by vel) 0.3 Citric Acid(sack) 0 SPR Pump 01 I SPR Pum p 82 j Soide(%by vel) 8.3 CON DET PREMIX(drum) 0 FIT EMW(ppq) 14.51 LCM(ppb) 0 BAROID 41(sack) 180 DRILL STRING AND HYDRAULICS CI Ung/L) 800 SOLIDS CONTROL EQUIPMENT AVDP(fps) 0 AVDC(fps) 0 Ca ung/L) 40 Shaker Screens Hours Annulus(bbls) 103 WOB(1Ib) 0 Cake(API 32nd inch) 2 Super G-70,80,80 3 24 Pipe(bble) 31 RPM 0 PF/MF(ml) 0.15/1.5 Super G-120.100,100 3 24 _-_ Pick Up(k4b) 68 TFA 0021 0 Po Vol(1310s) 300 Super G-140,140,140 3 24 Slack Off(k-lb) . 58 dP System(psi) 0 Hole(blots) 238 _ Gntrlfupe Spud Hours Comet RNA --_-__. -__ _._.. Jet Vol(fps) 0 ,dP @ Bit(psi) 0 Reserve(blots) 132 Pit 3 Centrifuge 2300 8 Morn j Description ---_-- 01)04_ �u)len( . (n) Top ca.111.ua Lem ray I Vendor--_crrmnrl.Nw L.mam tM ear soros I i i • TOTAL BHA LENGTH: - --------- MOST RELENT DIRECIONAL SURVEYS _ MD INC AZ j ND +NIS I +EI-W VS OLS ! Calculation ? VB AaknWh 3264.31 72 01 ' 258 82 2218.06 -425.02 -1925 42 • 1970.05 4.73 Minimum Curvature 255.18 3328 98 75 09 260 84 i 2236.39 -435 96 -1980.46I 2031.86 5.83 Minimum Curvature 255.16 3350.73 76.31 261.10 2241.76 -43927 -2007.27 2052.83 5.73 Minimum Curvature i 255.18 KUUKPIK RIG 05 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARYDATE OF REFERENCED UMIAQ REPORT:, 23-Feb-12 Customer_ Vol(gal)--- coelom i Vol(gal) Customer VoI�N Customer Vol(gal_ Summary Quantities Vol(gal) Delivered Today BSSSI4 Kuukpik(5) 3288.9 5 000-galon Tank(G) Total Diesel Consumed 284.140.1 On Hand Today Della Luse(0) , 120.0 Peak(D) 1804.5 23,000-g ( ) --_ sibs Tank D Total Gasoline Consumed 12,838.5 • Used Tolley GBR ADZ_ Tikigaq/Conam(D) 545.8 NSB Equipment(D) Diesel Consumed Today 6.417.7 Used this Well Halburton(D) 4716 Umiaq(D) 187.1 BGF(G) 503.5 Gasoline Consumed Today 503.5 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY • PROJECT HSE SUMMARY Company Pooltion Count Eat Hours I Total Hours Notes Incident Type Today Conrinenle Kuukpik Drilling Rig Craw 22 12 264 Illness 0 Kuukpik Drilling Tool Pusher 2 12 24 Injury 0 HES-BSS Cement ng 9 13 117 Three in p Sx staying Barrow Sp 11 I 0 HES-Baroid Mud 2 13 26 '. Tunda Disturbance 0 HES-Sperry - _ MWDILWDIDD 4 12 48 Bear Sighting0 HES Supervisor 1 13 13 'HES supervisor staying in Barrow N M s 0 GBR Casing Crew 2 12 24 Staying at B 8 B Umle• Ops Support i 8 12 98 Spill lath in camp.All others Barrow Vetco/Or.y _. Tech 1 12 12 Peak Rig Support 31 ---13 '403 Five In camp.28 staying in Barrow Kuukpik Catering Cook/Clean 5_ 12 eo I AlItiq Camp Manager 1 12 12 Beacon Medic 1 12 12 Oasis i Sample Catchers 2 12 24 PRA •Const Super r I 12 12 Staying in Barrow PRA DSMESTIMATED TOTAL DAILY LABOR HOURS: 24 PRA HSE 1 12 12 Geologist - - - - PRA eob9 st 2 12O 24 _ -.-- -- -_- 1207 ce Total P.rscehrN l n Camp:s+ vldrnle 4,_,-_,,,, WALAKPA#11 DAILY DRILLING REPORT 25-Feb-12 l' � Operator North Slope Borough Protect Description Barrow Ga I Well Site Leaden Don ansa./Thor Kawbd '. ..• Walt Name WalMpa 111 Cr Number 68O90 Cell Phone (907)980-4206 ..; .rre•en API t/AOGCC 50-023-20038-00-00 Land Use Permit NSB Development Penult Oreo Phone (907)771.1002 PTD t) Rig Accept 113 Feb @ 2400 Rig contractor Kuukplk Drilling,LLC:Kuukpk Dating Rig#5 Property Deeipnatlon Welakpe W.11 Site Phone (907)771.1021 Date/Time hrs -. 1._- Rig Release 00:00 Depth 3,420 MD -2,250 TVD Target Depth(het)Mb 5.335 MD 2,343 ND HSE Phone (907)771.1025 Dateliime (feet)rkb Days on Well 12 DART RIH -000' Operations Next 24- RIH.CIT b 2,500 pal for 30 minutes.Drill shoe track and 20'of open holo.FIT b Hours 13 ppg.Swap mud.Drill ahead OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Sort Finish -_-�- i Hours Description Detail 1 Daily Total 6:00 7:00 1.0 L/D landing joint,bails,elevators,etc --- 1.R g Up/Rig Down - - - --_-- 7:00 PN test joint,HWDP and running tool to set pack off.Drain stack.RILDS and test 2.Drilling _- 72.0 9:30 2.5 to 5k psi for 10 minutes.Lay out running tool 3.Reaming __ 9:30 10.30 1.0 Mlll h d pin.MN floor who b IOD dine and teal plug 4.Coring .__ _. - - _ 10:30 12.00 1.5 Chang top ems from 7 to b 4"end put new O-ring on lest plug 5.Condition and Circulate _ _-__......._ _- _ _ 12 00 Preplest 80PE.RIH withtk test plug.Fill stackck and choke manifold with water.Hook 6.Trips 8.5 53.0 _- 13.30 1.5 •test manifold.Hook up test hoses to manifold and top drive.Fit lines 7.Lubricate Rig p,0 I- 13:3 17-0 Test m and lmto250/250_0 Dti_T 1 related t le 250/3500 pr.Pul test 8.R Rig --. 1.0�- 1830 5.0 plug.Install r ring d UD teal joint.Good tests of BOPE 9 C/O -- . DM L'ne 2.0 2.0 18.30 19.00 0.5 Clean floor and prep to PN BHA 10.DeMaSan 3.5 _ 19:00 0.00 5.0 P/U bit motor and am rtloot.Program M/LWD.Calan pits 11 Wireline Log __ 000 ;Pu pteat toot PJSM prior to loading source..Load sources P/U flex joints. 12 R Casing and Cement 27.5 3:30 3.5 :`jars and HWDP joint 13.Wait on Cement - 3:30 • 4:00 0.5 RIH one stand 14.Nipple up BOP 2.5 40.5 4:00 1 6:00 1 2.0 Cul 60 of drilling line 15.Teat BOP 6.5 19.0 _ 16.Drill Stem Teal "'ED-15 Update'^ 17.Plugback - - Approomete volumes on hand:108 Ibis water,150 blots diesel,-2.000 waste fluid 18.Squeeze Cement 19.Fishing - - - _ _ "Currant Weather"' 21 Directional Work Tempanbrs:JO F.Winds variable-10 MPH 21.Other 3.5 16.0 TOTAL HOURS: 24.0 TOTAL HOURS: 240 201.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER I___SRE(In) 1 MFO 1 TYPE SERIAL NUMBER 1 JETS DEPTH IN(h) DEPTH OUT(fQ FEETI_GRADE OUT HRSOBDI FTIHR T 1 , 121/4 • HDBS Milltaab 11748526 3016-1012 48 1208 1180 1 WTAEFNO-TD 2834 40.93 2 81/2 • HDBS 1 FX 2526 PDC 50738136yI 5x13 1208 3420 2218 o-t-ar sx 1440-TD 2023 10964 3 6118 HDBS Maarxh 11562667 --- 3x73 3426 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM 20.2'RKB CEMENT PROGRAM --- Section 1 OD(in) I Weight(pp(' Grade Thread MD(ft) ND!ft) Contractor CP 1 TyppComments Conductor 16 84 L-80 Welded 101.5 101.5 Halliburton 26-Dec-11603:30 • C Permafrost TOC aI-15'-U-tubed Surface Casing 9 5/8 40 L-80 BTC-M 1.193 1,135 Halliburton 18-Feb-12 @0645- LBC Returns to Surface . Int Casing 7 28 L-80 BTC-M ' 3,415 Heiburlon 1 24-Feb-12 @0600 G _ l Plug bumped • • PUMP#1 PIMP I32 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer Ellis Williams Manu(acWtrTSM FL Temp CF, 52 DescriptionToday -_- Model WH-1000-A ModModelT3M1000 Time 23.59 DESCO Chrome nee(25#) 2 Liner Size(in) 5 Liner Size(n) 6 Weight(lbs/gal) 9.8 ALDACIDEG(5g pail) Stroke(in) 10 Stroke(in) 9 VIS(sec/qt) 48 ---KCI(sack) - ---- BBL/STK 6 96% 0.0583 i BBL/STK 0 96% _ 0.0755 PV int)) 19 Sodium Blembonate(sack) SPM _ 0 I SPM 0 VP(Ibsl100ft�) 21 __ BARO-TRIC PLUS(sack) i GPM 0 GPM --- 0 Gale ba/100hs) .�_._ 9/12/14 BARAZAN D.(sack) PSI 0 - - - 0 pH 9 -__._.OEXTRID LT(sack) WELL 'PSI Filtrate WL(mL130 min) 8 PAC-F(sack) SPR Pump#1 SPR Pump#2 ----Sand(%by cel) 0.3 Citric Acid(sack) SPR Pump#1 SPR Pump#2 Saida(%6y vol) 7.9 CON DET PREMIX(drum) FIT EMW(PP9) 14.5 LCM(ppb) 0 BAROID 41(sack) - ------_-_-- DRILL STRING AND HYDRAULIL'S CI(mglL) 800 SOLIDS CONTR L EQUIPME`/T AVDP(fps) 0 AVDC Opel • 0 Ca Ong/L) 40 Shaker Sweem Hours__ Annulus(bbls) 128 W OB(k-I131 0 Cake(API 32nd Molt) 2 Super G-70,80,80 3 12 - - Pipe(blots) 0 RPM 0 PF/MF(ml) 0.10/12 SuperG 720,100,100 3 12 S3889 3889 Pit Vol(bbls) 28(LSNO) Super G-140,140 140 3 Pick Up(k-Ib) 0 TFA fln�l Slack O8(k-lb) _0 dP System(psi) 0 Hole(blot) 128(LSNO) Centrifuge _ 12 Speed Hour Jet Val(fps) I o dP 6 Bit(psi) 0 Reserve(bbls) 322(Baredril) P4 3 Centrifuge 2300 0 BHA 400 Rem _.__I Descripti __- T OD(In) ' ID(M) Gauge(In)I Top Connection Length(ft) I Vendor Cumulative Length(S) ,BRTI.,... 1 �HDBS QH1R m311oo11) 5.900 2.000 6.125 P 3 1/2'REG 0.62 HAL 0.62 2 4 3l4"SperryDrip 7/8 Lobe-1.5 degree with A81 4.750 I 2.901 B 3 1/2'1F 38.28 HAL T 38.88 3 • Float sub 4.750 2.800 831/2'IF 2.19 ! HAL 41.07 --. __..._ -__ -_ _... 4 IABI receiver DSP collar q,7$p 7.820 B 31/2"IF 9.27 1 HAL 50.34 5 ILS 1 4.750 1.420 5.94 831/2"IF 358 I HAL 53.82 __. .. _ 6 Resistivity/Gamma/HCIM 4.730 1.420 8 3 1/2"IF 24.40 HAL 78.32 _ 7 14 3I4"DM collar _ 4.750 2.810 8 3 1/2"IF 8.56 i HAL 88.88 8 Neutron/Density tool 4.750 1.420 8 3 1/2"IF 25.48 1 HAL 112.36 - -- g 43/4"PWD 4.750 1.250 831/2"IF 9.18 HAL 121.54 _ 10 •4 3l4"TM HOC 4.750 2.812 _ 8 3 1/2"IF 11.28HAL 132.82 i 11 Circ sub with ball catcher 4.950 1.900 B 31/2'IF 11.41 HAL 144.23 12 •Flex collar 4.670 2.250 631/2'IF 31.04 HAL 175.27 ---- _ 13 Flex collar , 4.680 2.250 _i 031/2-IF 31.00 HAL 206.27 _ 14 Flex collar 4.780 1 2.250 831/2"IF 30.90 HAL 237.17 __ 15 1 XO - - 4.970 2.500 • B 4"Mod 2.64 HAL 239.81 16 14 3/4"hydraulic jars 4.820 2.000 B 4"Mod 28.28 WFT 269.09 17 i 4"XT-39 HWDP _.... 4.000 2563 TOTAL BHA LENGTH: 31.63 W FT 300.72 j 300.72 "�MOST RECENT DIRECTIONAL SURVEYS MD INC t AZI TVD t_+NI-S SEI-W 1_ V8 DLS Calculation L VS AxlmrBh.,. 326431 7201 25882 2218.06 -425.02 -1925.42 197005_--4.73 Minimum Curvature 25518 9328.08 75 09 260 84 2230.39 I -435.96 -1986.46 2031.88 5.63 Minimum Curvature ,_. 25516- - 9350.73 71i 31 261 10 2241.78 -439.27 -2007.27 2052.83 5.79 Minimum C W e 255.18 FUEL CONSUMPTION KUUKPIK RIO N DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:I 23-Feb-12 Customer _ Vol WO customer Vol Wel) Customer Vol(hall 1 Customer vgl(eaq Summary Quantities Vol(94 Delivered Today 2,500.0 BSS(D) Kuukpk(D) 3286.9 5,000-gallon Tank(G) Total oriel Consumed 284,1401 On Hand Today 6,700.0 Delta Lease(D) I 120.0 Peak(D) 1804.5 23,000-gallon Tank(D) Total Gasoline Consumed 12,838.5 22 248.0 H.lburton(D) 4738 Umieq(D) I 10547.1 'NSE Equipment(D) Diesel Consumed Today 6,417.7 Used this Well --- Used Today1 800.0 GBRAD) Tkgaq/Ganem(0) 187.1 ROE{G) � 503.5 Gasolene Consumed Today 5003.3.5 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY CompanyPadden .Gagne. Est Hours •Total Hours None incident Type Today m --_ I _. _. I � Comment.-_-_- Kuukpek Drilling Rig Crew 22 12 261 Illness 0 Kuuk aHpn DTod Pusher 2 12 24 Injury --- p ---_- -- - HES 4__.. HES•BSS Cementing 9 13 117 Three in camp.S&slaying in Bartow Spill 2 Sea Notes HES-Baroid Mud 2 13 26 Tunda Disturbance p HES-Sperry MWD/LWD/DD 4 13 52 Vehicle Damage 1 Cracked aide raniev mirror HES Supervisor 1 13 13 HES supervisor slaying in Barrow Near Miss 0 GBR Casing Crew _-_ 1 Umleq Op.Supper 8 12 96 Spill tech in camp.All others in Barrow Spell Notes:Two separate,small spills,occurred today.One Velco/Gray _Tech 1 12 i 12 involved a half cup of diesel whereas the other release was Peak Rig Support 31 14 • 434 Five In camp.26 slaying In Barrow two quarts of engine oil.Both have been cleaned and Kuukpk Catering Cook/C lean 5 12 80 _ reported with rgslte HSE. • Akoliq Camp Manager 1 12 12 Beacon Medic 1 12 12 - Oast Sample Catchers 2 12 24 --- --- - ---_ --__- PRA Const Super 1 12 12 SI Y•n9 in Barrow ragPRA DSM 2 12 24 _ PRA HSE 1 12 12 PRA lGeo 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 1218 Total Personnel In Camp:64 Individuals _ WALAKPA#11 DAILY DRILLING REPORT 26-Feb-12 4._- - d Operator North Slops Borough Project Description Barrow Drilling P. l Well Site Leaden Don Breeden/Thor KaleWd - S. Well Name Wabkpa#11 CW Number 08-090 C.9 Phone (907)980-4206 -�y,ido API#/AOOCC 50-023-20038-00-00 Land Use Permit NSB Development Penin Office Phone (907)771-1002 (PTD Rig Accept 13 Feb®2400 Rig Contractor Kuukpk Drilling,LLC:Kuukpk Doling Rig 015 Properly Designation W.kkpa Wap Site Phone (007)771.1021 / Date/Time hr. Rig Release 00:00 Depth 3,520 MD-2280 TVD Target Depth(fest)rkb 5,335 MD 2,343 ND HSE Phone (007)771.1025 Date/Time (feet)rkb Days on Wel 13 OART OBD 0 3,539' Opera H Wan aI24- DM through shale.Enter Wakaps sands.DM*heed OPERATIONS SUMMARY 24-HOUR ACTMTY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start I Finish Hour.-1 Description Detail l- Daily Total 6:00 I 6:30 0.5 Finish cutting 60'of drilling line 1.Rig Up/Rig Down � - - 6:30 10.:30 4.0 FiIH from 384'to 5,280' 2 Drilling 1Z5 84.5 10:30 11:00 0.5 Circulate hole dean at ewe --- 3 Reaming-_ 11:00 1200 1.0 RIM heed pin and tea using to 2,500 pi for 30 minutes.Good CIT 4.Coring 12:00 1230 0.5 RID testate equipment 5.Condition and Circulate 1.5 22.5 12:30 Kely up esteblWh circulation.Work through stringers.Tp Opal color al3330.Drill 6.Tripe __. 4.0 57.0_ 18:00 5.5 through_pluge,float collar,shoe track,float shoe,and 20'of new formation 7.Lubricate Rig 2.0 18:00 19:00 1.0 Circulate 2 bottom*up Pull to shoe.Blow down 8 Repair Rig � 1.5 19:00 19:30 0.5 FIT 1013 ppg.Good last 9.C/O Drill Line 0.5 2.5 19:30 21:30 2.0 ,1114111,[1....4 pwwpa,n fu.Jlsplacement Transfer Baradrill to clean pits 10.Deviation 3.5 21:30 22:00 0.5 Displace well with 8.7 ppg Baradrill 11.Wireline Log 22:00 23:00 1.0 Pull to shoe.Blow down Clean pita that contained LSND 12.Run Casing and Cement 27.5 23:00 0:00 1.0 Kelly up Establish circulation.Gal up,down,rotating weights and SPRs 13.Wail on Cement 0:00 6.00 6.0 Drill from 3.455'to 3529' 14.Nipple up BOP 48.5 - - --- 15.Test BOP _19.0 "'EB-15 Update':"-• ---- _-- 16.Dr*Stem Test. - ApproAmab wlumes on hand:196 bbls water,150 bbls diesel,2,338 waste fluid 17.Pbgback -.... _ _. .. Tubing and annulus pressures each-410 psi 18.Squeeze Cement 19.Fishing .""Current Weather'"' 20.Directional Work - - Temperature'.-40 F.Winds variable-5 MPH 21.Other 5.5 21.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 288.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER I SIZE(in) I MFG TYPE SERIAL NUMBER I JETS I DEPTH IN(k) -,DEPTH OUT Ik)I FEET. :GRADE OUT HRS OBD PTMR.: 1 12 114 HDBS Millionth 11748526 3x16-1x12 . 48 1208 1180 1-1.1"-A-6,100-713 28 34 40.93 2 CASINO AND COMPLETION61/8HDBS I FX 2526PDCx5686 3x13 1208 3426 2218 0.1CTSX4N0-TD 20.23 108.84 3 6 118 HDBS I MNIMan 11582867 t --- 3x13 3428 PROGRAM-ALL SET DE MEASURED FROM RKB CEMENTPROGRAM Section , 8eon OD(in) W 1 e�l(ppi) ; Orada .I_Thnad MD(ft) TVD jNj..-. Contractor __CIP Type Cmranen6___� Conductor 16 84 L-80 Welded 101.5 101.5 Halliburton 28-Dec-11 0 03:30 -C-Permafrost TOC at-15'-U-tubed Surface Casing 95/8 40 • L-80 r BTC-M ; 1.193 1,135 Halliburton 18Feb-1200045 L&C Returns to Surface Int Casng 7 26 L-80 I- BTC-M I 3.415 Halliburton 24Feb-12008:00 0 Plug bumped PUMP#1 PUMP#2 LONISOEgSMtIFDAPERSED MUD PROPERTIES LOW B&LIDS NON-MBPEI�SED FLUID INGREDIENTS Manufacturer Ellis William Manufacturer TSM FL Temp("F) 52 Description -__ T _.. 00 _-- Chrome W H-1000-A Model � TSM7000 Time 23:59 DESCO Chrome hee(256) 3 Liner Size(n) 5 L'er Size ' 6--- Weight( d ) B.7 ALDACIDEG(Sp DaA) _ 2 Stroke(in) 10 Stroke On) 9 VIS(sec/qt) 07 KCI(sack) 251 .. _ BBL/STK @ 96% 0.0583 BBL/STK @ 96% 0.0755 PV(cp) 15 Sodium Bicarbonate(east) 9 SPM 84 SPM 0 Yp(Ipd100k 25 XC-207(lig jug) 2 GPM 203 GPM -- __--------0 Gels(Ibd10083) 10/14/18 CNB Acid Anhydrous(sack) 3 PSI 1224 PSI _ -1--- - -0 pH 8.9 N-VIS(256) _ 25 W!L(COMROL Fibula WL(n.L/30 min) 5 PALL(mask) 9 SPR Pump#1 I SPR Pump#2 I 40 spm 0595 psi_-_ Sand(%bysol) NA N-DRIL HT PLUS(sack) _ 10 SPR Pump#1 'SPR Pump#2 Soida(%by vel) 0.8 CON DET PREMIX(drum) 0 FIT EMW(ppg) 13 LCM(ppb) 0 - BARACARB 25(sack) 30 DRILL STRING AND HYDRAULICS CI(mgtL) 28,000 _ - - SOLIDS EQUIPMENT AVDP(fps) 213 'AVDC(fps) _._.._ 333 Ca(mg/1.) r ) 80 Shaker Screen. Hou Annulus(bbls) 128 IWOB(k-lb) 12 Cate(API 32nd Inch) 1 Super G 70.80.80 3 24 Pip (bbls) I 35.4 RPM 38 PF I MF(ml) O 10.2 Super G 720,700,100 3 24 Pick Up(k-Ib) 62 TFA fn21 __. _.__. 0.3889 Total Cite(bole) -..-. 278 -_- Super G 140,740,140 3 24 Slack Off(k-Ib) 44 dP System(psi) 988 Hole(bble) 109 Cenkgupe Bp..d_ Hows• e. 217 __.._ _ _ ___-_- JetVol{fps) ; 167 dP @Bit(psi) Reserve(blots) 80 Pa 3 Centrifuge 2300 0 BHA 400 Item Deseripdon - OD(In) 1 IDjn) Ga4pan) ToD Connection Length(ft) I en CwarlrlM Lengtlh(it) BRT hour. 1 HDBS OHIO mAltoclh 5.800 2.000 0.125 P31/2 REG 0.82 HAL 0.82 23r" 4 3/4"BperryD 11 7/8 Lobe-1.5 degree with ABI .4.750 2.807 B 3 i l2 IF 38.26 HAL 98.88 3 Float sub I 4.750 I 2.000 B 3 1/2 IF 2.19 HAL 41.07 4 AB l receiver OSP color 4.750 7.920 B3112'IF 9.27 _. HAL 50.34 5 ILS 4.750 ' 1.429 5.04 B31/2'IF 3.58 HAL 53.92 r 9 Rssiatistyl Gemma/HCIM 4.730 1.420 B 3 1/2"IF 24.40 HAL 78.32 7 4 3/4"DM collar 4.750 2.810 831)2-IF 8.56 HAL 80.88 8 NMltron/Density tool 4.750 7.421B3112"IF 25.48 HAL 712.38 9 43/4"PWD 4.750 1.250 831)2"IF 9.18 HAL 727.54 10 4314'TM HOC 4.750 2.812 831)2"IF 11.28 HAL : 132.82 11 Ciro sub with ball catcher 4.950 1.300 B 31/2"IF 11.41 HAL 144.23 12 Flex collar q.870 2.250 B 3 1/2"IF 31.04 HAL 175.27 13 Flex collar 4.680 2.250 B 31/2"IF 31.00 HAL 206.27 14 ;Flex collar *.180 2.250 8 31/2"IF 30.80 HAL 237.17 15XO 4.970 2.500 B 4"Mod 2.84 HAL 239.81 16 '4 3l4"hydraulic jars 4.820 2.000 B 4'Mod 28.28 WFT 289.08 17 4"XT-39 HWDP 4.000 I 2.563 37.83 WFT 300.72 --^__- TOTAL BNA LENGTH:: 300.72 I MOST RECENT DIRECTIONAL SURVEYS MD INC AZ TVD ♦N/-S •61-W VS DLS Calculation VS Mama 3264.31 72.01 25882 2218.06 I -425.02 -1925 42 1970.05 4.73 Minimum Curvature 255.10 3328.98 75.09 260 84 2236.39 -435.98 -1986.46 2031.88 5.83 Minimum Curvatore 255.16 3350.73 78.31 261.10 2241.78 -439.27 -2007.27 2052.83 573 Minimum Curvatura --- _---255.16 FUEL CONSUMPTION KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAO R EPORT:1 24-Feb-12 _Customer ; Vol Well Customer Vol(gall Customer Vol(gal) Customs' I Vol_(gal) Summery Quantities Vol l Delivered Today 2,200.0 BSS(D) Kuukpik 1D) 280.7 5.000-gallon Tank(G) Total Diesel Consumed 287,574.17 On Hand Today 8,800.0 Delta Lea (D) 200.4 'Peak(D) 1764.0 23,000-gallon Tank(D) Total Gesolna Consumed 13,1755 Used Today 2,000.0 GBR(D) Tkigaq/Comm(0) 7728 NOB Equipment(D) Dias*Consumed Today 3 434 0 Used this Well 24,248.0 Halliburton(D) i 319A Umieq(D) 148.2 BGF(G) 337.0 Gasoline Consumed Today 337.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY CompanyI Position I Count Est Hours Total Hour. Notes Incident Type TodayComments Drilling Rig Crew 22 12 __264 F Moms 0 Kuukpk Oiling Tool Pusher 2 12 I 24 Injury 0 --- -- HES-BSS Cementing 9 13 117 Three it camp.Six slaying in Barrow SIM 0 -- _- HES-Burob Mud _ 2 13 _ 26 Tunda Disturbance 0 HES-Speny MWD/LWD/DD 4 13 52 Vehicle Damage 0 HES Supervisor 1 13 13 HES wperviaor staying in Barrow Near Mies 0 Conan Facilities 20 12 240 All personnel staying inti w ._... Umiaq Ops Support 8 12 96 1 Spill tech camp.Al others in Barrow Veto1o/G ay Tach 1 12 12 Peak Rig_Support 27 14 378 Five in camp.22 staying in Barrow -- - - -__- -- Kuukpk Catering Cook/Clean 5 12 80 _. Abtiq C*rnptMa 1 12 12 Beacon Medic 1 12 12 _ oasis Sample Catchers 2 12 24 PRA Coes 1 12 12 Staling In Barrow PRA DSM 2 12 24 PRA HSE 1 12 12 PRA Geobglet 2 12 24 ESIWATED TOTAL DAILY LABOR HOURS: 1402 Toad Penannel In Camp:54 Individuals MI gt� •na WALAKPA#11 DAILY DRILLING REPORT- 27-Feb-12 2J -`;.;. Opxator North Slope Borough pro}et Dea1YIpUon Barrow Gee ng I Well SMe Leaden Don Breeden/Thor KaleaW Drina P. "=^r Well Name W alskpe#11 CIP Number 68-090 Call Phone (907)980.4206 M�r-„n API#I AOOCC 50-023-20038-00-00 Land Use Permit NSB Development Permit Office Phew (907)771.1002 (PTD 6) Rig Accept 13 Feb @ 2400 R Contractor Kuuk st kp 0,Y.9 Rig properly DpigrWbn Date/Time hra b D Wing,LLC:Kuu k #5 Walekpa YWY Site Phone (907)771-1021 Rig Release 06:60 Depth 3,917 MD-2,296 ND Target Depth(feet)rkb 6335 MD 2,343 ND H8E Phone (907)771-1025 Date/Time (feet)rkb Days on Well 14 OART 080®3,934' Operations Next 24- Continue Mang ahead through Walekpa sands i Hours OPERATIONS SUMMARY 24-HOUR ACTMTY SUMMARY CUMULATIVE ACTMTY SUMMARY Start Fbtbh Moura DescriptionDetail O. Tabl 8:00 Drill from 3,455'to 3,529' 1.Rig Up/Rig Down 12:00 8.0 Up wt=62k down wt=40k,rotating wt=50k 2.Dning 24.0 108.5 12:00 Drill from 3,529'l0 3,803'.Enter sand around 19:30 at 1725 MD/-2,295 ND 3 Reaming 0',00 12.0 Up wt=02k,down wt=36k,rotating wt=51k 4.Coring --_-- ._ 3,803' Circulate -__- 0:00 8:00 11.0 Drill from 10 3,815' 5.Condition a and d 22.5 6.Trips 57.0 - --- 7 Lubricate Rig 2.0 8 Repair Rig 2.5 9 C/O Drill Line 2.5 --- 10.Deviation ti3.5 _... 11.Wireless Log _ -.. -_--.------- 12.Run Casing and Cement ..-27.5 13.Wait on Cement 14.Nipple up BOP 46.5 15.Teal BOP 19.0 5".E13-15 Update"' 16.pit Stem Test Todays injection was haultad due to a waste fluid spill.Al spiked fluid was captured 17.Runback within secondary containment.Sea spill notes below for details 18.Squeeze Cement 19.Fishing ... ^'Currant Weather"' 20.Directional Work _ -5--' t � _-Temperature:-40 F.Winds variable-5 MPH 21.Other 21.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 I 312.0 DRILLING AND COMPLETION INFORMATION BR NUMBER I SIZE(in) I MFG TYPE 1 SERIAL NUMBER I JETS DEPTH I (k) DEPTH OUT(MI FEET I GRADE OUT MRS OBD I FT/HR 1 12 1/4 HOBS MINN. 11748526 3x18-1012 48 _ 1208 1160 1-1-WT-A-E-1-140-113 28.34 40.93 2 _ 81/2 HDBS FX 2526 PDC; 5513608 5x13 1208 3426 2218o-tC0axiN0-00 20.23_ 10964. 3 61/8 HDBS MIltcot, 11552867 3x13 3426 CASING'AND COMPLETIONPROGRAM-ALL SET DEPTHS MEASUREDI FROM RKB CEMENT PROGRAM Section I 001n) Weight(PPO Grade 1 Thread_1 MD(le) TVD(ft) Contractor1 CIP Type I Comrwnb -_. Conductor 16 64 LOU- Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03:30 C Permafrost TOO at-15UWbed Surface Casing 9 5/8 I 40 LOU- I BTC-M 1,193 1.135 Halliburton 18-Feb-12 @ 05 45 L&C Returns to Surface Int Casing 7 "" 26 L-80 BTC-M ' 3.415 2 256 Halliburton 24-Feb-12 @ 0610r G-_ - Plug bumped--_ PUMP#1 PUMP$12 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer • Elks William Manufacturer TSM FL Temp cF) 66 Description I Today Model i WHT 000-A M del TSM1000 Time 23'.59 DEXTRID LT(sack) 10 Liner Size(In) 5 I Liner Size(in) 8 Weight(Ibs/gal) 8.8 ALDACIDE O(5g pall) 3 Sticks(in) 10 Stroke lin) 9 VIS(sec/qt) 58 KCI(sack) 82 BBUSTK @ 96% i 0.0583 BBL/STK @ 96% 0.0755 PV(op) 15 Caustic Soda(sack) 2 SPM 0-... ;SPM 67 YP(166/100e) 22 XC-2071691u9) 3 GPM 0 GPM 212 Gob�s/1W19) 8/12/til Citric Acid Anhydrous(sack) 0 PSI..__.__ 0 PSI : 1,327 pH ._.. .-_ --. 10 N-VIS(258) 18 WELL CONTROL Filtrate WL(ml/90 min) 5 PAC-L(sack) 16 -- --_ _- n-- SPR Pump#1 SPR Pump#2 40 spm @ 585 p Sand(%by vol) 0.25 SODIUM SULFITE(sack) 4 SPR Pump#1 FSPR Pump#2 Solids(%by vol) 1.3 BARACOR 700(drum) 2 FIT EMW(ppg) 13 LCM(ppb) 0 BARACARB 25(sack) 16 DRILL STRING AND HYDRAULICS CI(mgIL) 34,000 SOLIDS CONTROL EQUIPMENT AVDP(fps) 218 AVDC(fps) 338 Co MA) 40 Shaker � Screens Hours Annulus(bble) 81 W OB(k-Ib) 15 Cake(API 32nd NM) I Super G-120,120,120 3 24 --- PF FIM MF Pipe(hble) 39.1 RPM Dor 80 / (ml) 0.15/t.2 Super G-120,100,100 '� 3 y_ -.24 UPWeight(k-0) 62 TFA fin') 0.3889 Total Circ(blots) 449 Super G-140,140,140 3 I 24 • Down Weight k4b 36 d0-System � 1051 Hole bbis 120 Centrifuge S ed ours � 1 - -_ _- Ya si ) r ) 0 9° Pe Jet Vel((pa) 170 d0-@Bit(psi) 228 Reserve(blots) 180 Po 3 Centrifuge 2300 8 BHA 400 Item Description 00(hr). L ID(in) 1_OaugeJln)Ir Top Connection Lg entlr(A) Vendor Cumutaw tlLength Qq I BRT hours_ 1 HDBS QH1R dtooth 5.900 2.000 ;_6.125__ P_31/2"REG 0.82 HAL 0.82 -- 2 43/4'SpanyDr#7/8 Lobe-1 5 degree with ABI 4.750 2.901 I 8 3 1/2'IF 38.26 I HAL 38.88 su 3 Float sub 4.750 2.600 B 3 t2'IF 2.19 HAL 41.07 I 4 ABI receiver DSP collar 4.750 1.920B 312'IF 9.27 HAL 50.34 --- - 5 ILS 4.750 _ 1.420 , 5.94 B 3 1/2"IF 3.58 HAL 53.82 _ 6 ReNetivity/Gamma/HCIM 4.730 1.420 _ 831/2'IF 24.40 HAL 78.32 7 4 3/4 DM toter 4.750 2.610 : B 312"IF 8.58 HAL 86.88 8 Neutron/Density tool 4.750 1.420 8312"IF 25.48 HAL 112.36 9 43/4-PWD 4.750 1.250 8312'IF 9.18 HAL 121.54 10 43/4"TM HOC 4.750 2.812 8 912'IF 11.28 HAL 132.82 11 Circ sub with tial catcher 4.950 1.300 B 3 12'IF 11.41 HAL 144.23 12Flax color 4.870 2.250 • 8312"IF 31.04 HAL 175.27 . __. 13 Fisc color 4.680 2250 831/2"IF 31.00 '. HAL 206.27 14 Flu collar 4.780 2.250 831/2'IF 30.90 ' HAL 237.17 15 XO 4.970 2.500 0 4"Mod 2.64 HAL 239.81 _�.... - -. - - 18 49/4"hydraubpn 4.820 2.000 84"Mod 29.28 WFT 269.OB 17 4'X739 HWDP 4.000 2.563 31.83 WFT 300.72 --- ----- TOTAL BHA LENGTH: 300.72 MOST RECENT DIRECTIONAL SURVEYS MD INC : AZ TVD 1 •NIS tE/-W VS 1 DLS Calguletlon j VB Azimuth 3690.24 86.]9 256.]8 229348 -495.28 -2337.27 2386.16 2.65 MntmumC tura 255.18 _._. 3752.33 86.23 257.01 � 2297 24 -509.32 -2397.63 2448.11 0.97 Minimum Curvature 255.16 3813.70 89.39 255.74 229959 -523.76 -2457.22 2509.41 555 Minimum Curvature I 255.16 FUEL CONSUMPTION KUUKPIK RIO 05 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 25-Feb-12 Customer .-_Vallg�l) Customer Vol9an Customer VolBaq Customer ' Vol Summary Quantities Vol(gal) DNsered Today 1,500.0 BSS(D) KuukpA(D) 2659.4 5,000yabn Tank(G) Total Diesel Consumed 293807.1 On Hand Today 6,000.0 Delo Lou.,(D) 220.0 Peak(D) • 1809.7 I 23,000-gallon Tank(D) Total Gasoline Consumed 13,6315 5 U _ - --_ Used Today 2,400.0 OBR(D) Tikigaq/Conam(D) 862.9 NSB Equpmeal(D) Diesel Consumed Today 8 232 0 Used this Well 28 848.0 Halliburton(D) 5751 Umleq(D) 304,9 BGE(01 4811 Gasoline Consumed Today 461.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY stH Company. L PeaMbn Count Est Hoon I Total Hours Nein Incident Type TodayCawrwnb KuukpA Ceiling Rig Crew 22 12 264 I INness _ 0 I Kuukplt Drilling Tool Pusher 2 12 24 Injury 0 _ HES BSS Cementing 9 13 117 Three in P Six ata yng in Bartow Spill 3 Sae notes below HES-Barad Mud 2 13 26 Tunda Disturbance 1 0 HES Sperry MWD/LWD/DD _ 4 13 52 - - --- - -- -- Spill Notes:HES was approximately halfway through its EB-15 HES _ Supervisor 1 13 13 .HES sup rsfayngn Borrow Conant Facilities 20 12 240 All personnel staying h Barrow _ injection("1,200 blots injected)when about 50-60 blots waste fluid --- - leaked from a connection.Al)was in seconds containment.The Umiaq Opp s Support 8 12 96 Spill tech in camp.AlAI others Barrow N Veto Gray Tech 1 12 12 stoning 1 S leak necessitated zto t the injection.Details are incoming and will Peale R'•Support 27 14 378 Five in camp 22 staying in Barrow be summarized on morning call.Two other small spills occurred and Kuukpk CateringCook/Clean 5 12 60 have been cleaned,a quarter cup of glcyol and a similar amount of Alutq Camp Manx 1 12 12diesel were spilled. Medic Beacon Me1 12 12 - ---- _ _-- Oasis Sample Catchers ' 2 12 24 PRA DSuper I 1 12 12 Slaying Barrow - -- --- -- -- MgPRA DSMSM 2 t2 24PRA HSE 1 12 12PRA Geologist 2 12 24IESTIMATED TOTAL DAILY LABOR HOURS: 1402 Total Personnel In Camp.54 Individuals WALAKPA#11 DAILY DRILLING REPORT 28-Feb-12 < k.- -' Operator North Slope Borough P1Maot Description Bartow Gas I Well Site Leaden Don Breeden/Thor Kalosted !rang Pi ;®i'.-.;,�7etY1>,F. -nine_ -..\-.:_y Well Name W.l.kpa 611 CP Number 88-090 Cell Phone (007)9804200 s, ,��'f, API 6/AOOCC 50-023-20038-00-00 Land Use Penni NSB Development Permit Office Phone (907)771.1002 (PTD I) Rio Accept 13 Feb @ 2100 Rig Contractor irlp,Kuukpik DrLLC:KuukDrilling R _Date/Time lore pk p 65 Roped,'Desgnatlon Weedless Well Site Phone (997)771-1021 Rip Release 08:00 Depth 4213 MD-2,321 ND Ta Date/Time (feet)rkbrget Depth(feet)rid. 5,935 MD 2,343 ND E Phone (907)771.1025 Days on Well 15 OART OBD @4,25T Operations Next 24 pt70H for bit hip after next kalydown Hours OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Stam ' Finish Hours 1. Descri .-- --. l- Description Detail Daily Total 8.00 12.00 6.0 I Drill front 3,915'to 3.949' 1.Rig Up/Rip Down _-- - l ---_.-__ nine -_-. _--.._... _. 12:00 0'.00 12.0 Drii from 3 3,,949'to 4.120' 2.Drlin9 24.0 132.5 nine .. _- 0'.00 6.00 8.0 Dnl from 4,120'10 a 213 3.Reaming 4.Cooing -_. 5.Condion and Ckwhlo 22.3 Losses have been small and manageable 8.Trips 57.0 -Two drums of NSX lube have been added to active.Additional drums are on location 7.Lubricate Rig 2.0 Bit is roughly see hours past rated on bottom hours 8.Repair Rig 1.5 9.C/0 Drill= 2.5 10.Deviation 3.5 11.Wire..Log -- 12.Run Casing and Cement 27.5 13.Wail on Cement 14.Nipple up BOP 48.5 15.Test BOP 19.0 __ ^'EB-15 Update"` 18 Drill Stem Test _ Approumately 1,200 blots remain to be injected during nett injection event 17.Plugback ._ 18.Squeeze Cement 19.Fishing - '^Current Weather"' --- 20.Directional Work - --- Temperature:-40 F.Wind -_ para arable-10 MPH 21.Other 21.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 390.0 DRILLING AND COMPLETION INFORMATION BR NUMBER I SIZE(in) MFG . TYPE 1 SERIAL NUMBER JETS 1 DEPTH IN(ft) :DEPTH OUT(S) FEET T GRADE OUT l HRS OBD I FT/HR 1 121/4 HDBS MrIIoom 11748526 3116-1012 48 1208 1180 i ]01,101-00 ' 28.34 40.93 2 81/2 HOBS _ 'FX 2526 PDC 5013668 5013 1208 3426 2218 o-rcd -x01+0-r0 20.23 10984 _ nine._ 3 Mwth 8118 HDBS � MA1156266] 3013 rt 3426 I CASING AND COMPLETION PROGRAM-AU.SET DEPTHS MEASURED FROM RKB CEMENT PROGRAM Section 0D ) In Weight )-nine � Gr Thrud I D(S) Contractor CIP T Type Comments -_- I N Annie ( de ..- MD(S) Conductor 16 84 L 80 Welded i 101.5 101.5 Halliburton 26-00c-11 @ 0130 C"Permafrost TOC at-15-U-tubed Surface Casing 9 5/8 40 L-80 BTC-M 1.193 1,135 Haub rlee 18-Feb-12 @ 06 45 L&C Returns to Surface Int Casing 7 26 L-80 BTC-M 3.415 • 2.256 Haiburton 24-Feb-12 @ 06 00 G Plug bumped • 1__-__... PUMF 61 - PUMP 62 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOI LIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer � Ellis Williams Manufacturer _ TSM FL Temp("F) 74 Description Today Mode WH-1000-A Model TSM1000 Time 23.59 DEXTRID LT(sack) abs Liner Size(ST5 Liner Sim(n) 8 Weight Obslgal) 8.8 ALDACIDEG(Sg pail) I 1 Stroke(in) 10 Stroke(n) 9 VIS(sac/qt) 52 KCI(sack) 170 BBL/STK @ 98% 0.0583 BBL/STK 0 96% 0.0755 PV(cep) 16 Caustic Soda(sack) 1 SPM 0 SPM ., 66 YP(I10o/100ht) 22 AQUAGEL(sea) 101 GPM 0 GPM __ 208 Gels(11.3/1501lz) 8/11/14 N-DRIL HT PLUS(sack) 10 PSI , 0 PSI • 1,315 pH 9.9N-VIS(205) 13 WELL CONTROL Filtrate WL(mL/30 min) 5 NXS LUBE(55g drum) 2 SPR Pump 51 40 spm @ 443 SPR Pump 02 Sand(%by vol) 0.25 SODIUM SULFITE(sac() 0 SPR Pump 51 SPR Poop 02 Solids(%by vel) 1.7 BARACOR 700(drum) '/ FIT EMW(ppg) 13 LCM(ppb) 0 BARACARB 25(sack) 15 DRILL STRING AND HYDRAULICS CI(mg/L) 38,000 SOLIDS CONTR L EQUIPME 61 AVDP(fps) 223 AVDC(fps) 348 Ca(mg/L) 80 Shaker Noun -__ Annulus(blots) 87.3 W OB(k-Ib) � 15 Cake(API 32nd inch) 1 Super G-120,120,120 24 .._ AAAA_. -----_- ____ Pipe(blots) -.. 42.5 RPM 0 o 60 PF/MF(mi) 0.02/0.4 S_.. p G-120,100,100 3 24 Pick Up(k46) 62 TFA lin') 0.3889 Total Circ(blots) 500 Super G-140,140,140 24 -_. ----_ -_-- - Annie Slack Off(k-16) 36 �dP System(ye) 1075 Hole(bbl) 130 Centrifuge Spew Hours nine_ Jet VN(fp) 175 dP @ Bit(Pa) I 240 Reserve(bbl) 166 - Pit 3 Centrifuge _---- ---2300 24 _ _ BHA 460. Nam ----_D.aerlptlon _OD(14ID(In) Wugp_SALT Top con eetion Length(h) I Vendor Camuletiw Length(S).... BRT hours_ 1 HDBS QHIR millbsoth 5.900 2000 8.125 P3lir REG 0.62 HAL 0.62 - 2 ---- - nine. 2 43/4 SpertyDrb 7/8 Lobe-1 5 cep vvOh ABI 4.750 2.901 B 3 12 IF 38.28 HAL 38.88 .-_ 3 Foal b 4.750 2.600 831/2"IF 2.18 HAL 41.07 4 A81 receiver DSP color _-- 4.750 1.920 _-- B 91/2-IF 9.27 HAL 50.34 5 ILS 4.750 1.420 5.948312-IF 3.58 HAL 53.92 _-- - - Anne_. 8 'Resistivity/Gamma/HCIM /.790 1.420 • B 312'IF 2440 HAL 78.32 7 43/4'DM color 4.750 2.610 • 8312"IF 8.56 HAL 88.88 _.- - .--__-_ - 8 Neuuon/Dsnady tool 4.750 1.420 8312"IF 25.48 HAL 112.36 9 _ '.4314"PWD 4.750 1.250 8312-IF 0.18 HAL 121.54 10 '4314"TM HOC 4.750 2 812 8312-IF 11.28 HAL 132.82 11 I Circ sub with ball catcher 4.950 1.300 B 312'IF 12 :Flex collar 11.41 HAL 144.23 4.670 2.250 B 912'IF 31.04 HAL 175.27 13 I Flex collar 4.880 2.250 8 312'IF 31.00 HAL 208.27 _"-_- - _-- 14 Flex collar . 4.780 2.250 8912"IF 30.90 HAL 237.17 15 XO 4.910 2.500 8 4"Mod 2.84 HAL 239.81 16 43/4"hydraulic jars 4.820 2.000 B 4"Mod 28.28 WFT 289.09 _------ Annie_ 17 4"XT-31)HW DP .1.000 2.583 31.63 WFT 300.7T TOTAL RHA LENGTH: 300.72 MOST RECENT DIRECTIONAL SURVEYS MD r _ INC AZ i TVD +NI-S +E/-W VS _ 01.19oI.Oon VS Azimuth C.to 7-- .__. --- 3939.93 90.19 255 OS . 2301 63 -554.79 -2579.55 2635.60 1.07 Minimum C lee e _ 255.18 4002.38 88.39 254.07 2302.41 -571.41 -2839.79 289804 3.28 Mnknum Curvature 255.18 Anne- __ 4085.44 86.17 25446 2305.40 -588.49 -2700.38 2781.01 3.57 Minimum Curvature 255.18 FUEL CONSUMPTION KUUKPK RIO 65 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:( 26Feb-12 cwrom.r f va(g.q .. Customer 1 Vol(gal) Customer 7 valw4 - Cotton=. __-vaWI_- Stp.rnaryt'iva.tAW valw9 Delivered Today 1,000.0 BSS(D) Kuukpik(0) 2547.2 5,000-palbn Tank(G) Total Diesel Consumed 299,7011- On Hand Today I 4,500.0 Delta Luse(D) 231.3 Peak(D) 1863.0 23,000-gallon Tank CO) Total Gasoline Consumed 14.0115 5 ---- Used Today 2,500.0 GBR(D) Tkigaq/Conam(D) 1 785.2 NSB Equipment(D) _ Diesel Consumed Today 5094.5 Used this Wel 29,148.0 Halliburton(D) 315.5 Umlaq(0) I 152.3 BGF(G) 382.0 Gasoline Consumed Today 382.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARYL_ PROJECT HSE SUMMARY -_.--_-__-_ Company,. Position Count Est Hours ',Total Hours Notes incident Tyle TodayCamm.n4 -_.. nine Kuukpik Drilling Rig Crew 22 12 264 Illneae 0 Kuukpik Drilling Tool Pusher AAAA- 2 12 24 Injury _ 0 HES-BSS Cementing 9 13 117 Three In camp.Six staying in Barrow Spill --- 0 HES-Baroid Mud2 13 26 Tends Disturbance 0 HES-Sperry MWDAWDIDD L.. 4 13 52 -. Vehicle Damage 0 HES Superviur � 1 13 13 HES supervisor staying n Bartow Nur Mies 0 Cone Faciies 20 12 240 Al _-, penonrnN staying n Barrow Umiaq Ops Support 7 13 91 Spi tech h.camp.Al others in Bartow-- I Veleo Grey Tach I 2 � 12 24 _ Peak Rig Support 27 14 378 i Five In camp.22 staying in Bartow Kuukpik Calerkp Cook/Clean 5 12 80 __ Akdiiq Camp Manager 1 12 12 Beacon 'Medic 1 12 12 - - Oasis Sample Catchers 2 12 24 PRA Const Super 1 12 12 Swing n BYrow PRA DSM 2 12 24 PRA HSE 1 12 12 PRA Geologist - 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 1409 Total Personnel In Camp:55 Individuals - 0i`^-' a ,ri • WALAKPA#11 DAILY DRILLING REPORT 29-Feb-12 • 6 ow Operator North Slope Borough Project DesorlptIon Ba DiilrOio Po i Well Site Leaden Don Breeden/The KaMlad �•-yWell Name Walakpa 011 CIP Number 88-090 Cell Phone (907)580.4200 • �.0W' API' oocC 50.023.20038-00-00 Land Use Permit B Development Penne Pelmet ORM Phone (907)771-1002 Rig Amyl 13 Feb Q 2400 Rig Contractor) Kuukpk Drip.LLC:Kuukpk DIM Rig 05 Property De.Ignatlon We.kpe Well Sib Phew (907)771.1021 DateRkrw hrs Rig Rase 08:00 Depth Dab/Tnw (feet)rkb 4,275 MD-2,328 TVD Target Depth(Mt)Mb 5,335 MD 2,943 TVD NSE Phew (907)771-1025 Days on Well 10 DART RIH a•53c Operations Next 24 RIH b shoe.Kelly up,CBUelevators. as.Run in OH on Wash down needed. `' Hours Tag upon bottom.Drib ahead OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start Finish Hours _---- Description Deta8 Daily. Toll 4 _.. Rig p..Rig Down 6:00 8:00 2.0 Drill from 4.213'to 4,275' 1 U / Down --. _--.. clean. _... -_- _- - 8.00 9:30 1.5 Ckculata hole clean.Monitor well.Prepare for bit trip. 2.Drilling 2.0 134.5 -_ - 9:3:300 ul Pon!Puti from 4,275'104,750'.Tghta4,150'.30k ovarput.Beck ream from 4.150'to 3.672' 3.Reaming I __-.. ...._. --. 12:00 25 ui on elevators from 3,872'b 3,597.Up=84k.Dolan= k.Rotating n =5lik 4.Co ----_ mq 72:00 12:30 0.5 RI from 3,591'to shoe 5.Conditionand Circulate 2.0 24.5 -.. ---- -- r well. dry 12:30 13:00 0.5 C8U.Monitor Pump job B.Trips 18.0 75.0 13:0018:00 3.0 PO hom shoe to 300',top of BMA 7.LubricateR'p 2.0 -_- - 10:00 17:00 1.0 Stand back HWDP and jars.L/D flex collars 8.Repair Rig 1.5 17:0017:30 0.5 PJSM.Remove porosity tool sources 9.C/O Aa Line 2.5 ---- 17:30 19:00 1.5 Download LWOtools.Monitor well.4bbls4v static tosses 10.Deviation 9.5 _1900 _. ss _.. 19:00 21:00 ' 2.0 Process MWD D da..Service rig 11.WYebre Log 21:00 23:30 25 UD BHA and break of bit 12.Run Casing and Cement 27.5 23:30 0:00 I 0.5 MN bit and new mud motor 13.Wad on Cameral 000 ___ _8,00 6.0 P/U BHA Program tools Successful pump lest Load sources 14.Nipple up 90P M.5 - - 15 Teal BOP 19.0 "'EB-15 Update"fli 76 Drill Stem Teel ApEoximab volumes al hand:798 bbls water.110 bbls diesel,1,480 bbls waste fluid 17,PW9back - i- Continued cleaning remnantsSqueeze of spilled waste fluid inside the secondary containment 18.SCameral _-_-.- -- - 19.Fishing ---fl.Current Current Weather:.'• 20 Directional Work Temperature'.-40 F.Winds variable-5 MPH 21.Other 2.0 23.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 I 360.0 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG TYPE I SERIAL NUMBER 11 JETS 1 DEPTH IN(ft) DEPTH OUT(ft): FEET GRADE OUT HRS 0E04 FT/FIR 12 114 HOBS Milltooth 11748526 3016-1012 48 1208 1160. i_1-1-WT-A-6-1-90-TO 28.34 i 40.93 2 81/2 HDBS FX 2526 PDC 5013668 5013 1208 3426 2218 u-1-CT-S.x+NO-TO 20.23 �i 109.84 3 61/8 HOBS-OH1R Milltoo0 ' i l . 11562687 3013 III 3426 4275 849 4550 18.68 4 6118 HDBS-QH1R MAltooth � 11484396 � 3013x 4275 j CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RIO CEMENT PROGRAM Section OD(in) j Weight(ppf) Grade Thread I MO TVQ(N) Contractor I CIP Type, Comments Conductor 16 84 L 80 Welded � 101.5 101.5 Halliburton 28-Dec-1103:30 'C'Parmahoa TOC at Surface Casing 95/8 40 L-80 BTC-M 1.193 1,135 Halliburton 113Feb-12008:45 L&C Returns to Sodom Int Casing 7 26 L-80 BTC-M - 3,415 2,256 H0Yiburlon • 24-Feb-12 0 0800 G Plug bumped PUMP 61 PUMP 52 ..MDhFOMPERSED NUD PROPER_TES I DS NON-DISPERSED FLUID INGREDIENTS Manufacturer EIAs Williams Manufacturer I TSM FL Temp(°F) 88 Description Today Madel WH-1000-A 'Model TSM7000 Time _ 23:59 DEXTRID LT(sack) 10 Liner Size(in) 5 Liner Size(in) 0 Weight(bdgd) 8.85 ------ ALDACIDEG(59 psi) ----_1 ._ _ Stroke tin) 10 Stroke(in) I 9 VIS(eadgl) SB KCI(sack) 0 BBL/STK ta 98% 0.0583 BBL/STK 0 98% 0.0755 PV(cp) - 15 BARZAN D PLUS(255) 4 SPM 0 SPM 0 YP(WI1008) 18 --- AQUAGEL(sack) 100 GPM 0 GPM 0 Gas(ba/100112) 8/12/19 N-DRIL HT PLUS(seek) 0 • PSI 0 PSI 0 pH 9 N-VIS(250) 0 WELL CONTROL Filtrate WL(mL/30 min) 4.8 NXS LUBE(55g drum) 1 SPR Pump#1 40spm _-- spm X443 'SPR Pump 02 Send(%by vol) 0.25 SODIUM SULFITE(eadt) 0 SPR Pump St SPR Pump 52 Solids(%byvol) 1.7 BARACOR 700(drum) 10 FIT EMW 6/p9) 13 LCM(ppb) 0 BARACARB 25(sack) 190 • DRILL STRRI(.AND HYDRAULICS CI(mgt.) 34,000 SOLIDS CONTROL EQISPMETIT'. _ - ---_---- AVDC(fps) 0 Ca(m9ri) 60 Shaker Screens Hour AVDP(fps) _ 0 e_--_ }___� Annulus(blob) 0.0 W013(k-Ib) 0 Cake(API 32nd inch) 1 Super G-120.120 120 3 12 Pipe(bbls) _ 0.0 RPM 0 PF/MF(ml) - - 0.01/0.4 Super G-120,100 100 3 12 Pick Up(k-Ib) N/A TFA fin') 0.3889 Total Circ(bbls) 424 Super G-140,140 140 ' 3 12 r Slack Off(1,16) N/A dP System(psi) 0 Hole(bbls) 159 Centrifuge f Speed Hours Jet Vel(fps) 0 dP 0 Bit(psi) • 0 Reserve(bbls) 182 Pit 3 Centrifuge , 2300 12 • BNA 600 Item Description OD it) . ID(In) r°fugu&I� Top Connection Length w Vendor j CumulaNLength(ft).-_ BRT hours 1 _-_- HDBSOH1R miltcoth ----- 5.900 2.000 II 6.125 ) P31/2"REG 0.62 HAL 0.62 -- - - i 2 4 3/4"SperryDrill 7/8 Lobe-1.5 degree with ABI 4.750 2.901 B 3 1/2"IF 38.22 HAL 38.84 3 Float cab 4.750 2 600 B 3 1/2"IF 2.19 HAL 41.03 4 Spacer Wb 4.750 I 1.920 B 3 1l2"IF 2.19 HAL 43.22 6 ResistiOty/Gamma/HCIM 4.730 1.420 B3112"IF 24.34 1 HAL 87.58 7 14 3/4 DM polar 4.750 2.610 B 3 1/2"IF 8.56 HAL 78.12 8 Neutron/Density tool 4.750 1.420 B 3 1/2"IF 25.48 HAL 101.00 9 43/4'PWD 4.750 1.250 83112"IF 9.18 HAL 110.78 - - - - - 10 4 3/4"TM HOC 4.750 2.812 B 3 1l2"IF 10.83 HAL 121.71 11__ Circ sub with ball catcher 4.950 1.300 B 3 1/2"IF 11.41 HAL 193.12 12 Flex collar 4.670 2.250 831/2"IF 31.04 I HAL 16.1.18 13 Flex collar 4.680 2.250 B 3 1l2"IF 31.00 HAL 195.18 14 Fbz collar 4.780 2.250 B3112"IF 30.90 HAL 226.06 15Mod 2.64 00 4.870 2.500 B 4" HAL 228.70 _ -_ . --- --. -.-._ 16 4 3/4'hydraulic tars 4.820 2.000 B 4'Mod 29.28 WFT 257.98 - 17 14"XT-39 HWDP 4.000 2.563 31.83 `- WFT 289.01 -- TOTAL BHA LENGTH: 289.01 MOST R CENT DIRECTIONAL SURVEYS MD -..-f -__.____. INC L AZ TVD en 14 eE/-W VS DL8 Calculation VB Azimuth -_. .0 .57 Minimum Curvature 4065.44 88.17 254.48 2305.40 -58549 -2700.98 2781.01 9.57 Minimum Q9rVaalro 255.18 4126.16 83.88 --_- --- --255.45 2310.84 -804.71 -2780.70 2829.40 3.08 Minimum Curvature 255.18 4192.64 8400 25522 2917.85 -820.94 -2822.79 2887.61 0.40 Minimum Curvature 255.18 FUEL CONSUMPTION KUUKPK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 27-Feb-12 cwmmer Vol Wall customer I vala•B- Cuetonser _I val9ag I Customer wa(gaQ summaryQwntlWs valaa9 Delivered Today 3,000.0 SSS 1fi1 Kuukpik(D) 1801.0 I 5,000-gallon Tank(0) j Total Dorsa Consumed 304,849.7 On Hand Today_ • 5,200.0 Della Lease(D) 2205 ,Peak(D) I 1 095.3 123.000-gallon Tank(D)_-_ Total Gasoline Consumed 14388.0 __. Used Today_ 2 3000.0.0 GBR(D) Tlklgaq/Conan(D) 729.6 1NSB Equipment(0) Domed Consumed Today 4,948.1 U1ed this Wei 31,448.0 Halliburton(D) 561.0 Umiaq(0) 140.6 BGF(G) 350.5 Gasoline Consumed Today 350.5 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY I PROJECT HSE SUMMARY Company Pw8bn Count Est Hours I Total Houn`.. _ Notes kwldent Type Tods/___• Comments Kuukpik Drilling Rig Craw 22 12 I 264 Illness Kuukpik Drilling Tool Pusher 2 12 24 Injury _.. -.. o o_- - - ---__ HES-BSS 'Cementing 9 13 117 Three ncamp Sixstaying g Barrow Spill HES:Beroki 'Mud 2 13 26 Tunnel Disturbance HES-Sperry MWD/LWD/DD 5 13 85 Change out dayforMWD personnelVehicle Damage HES Supervisor 1 13 19 HES arparvhor elayilg in Barrow Near Miss Conan Facilities _ 20 12 240 Al personnel atging in Barrow Umiaq Ops Support7 13 91 Spa tech in camp.Mothers in Barrow- -- Vetoo Gray Tech 2 12 24 __ _--- Peak RigSUpPOri 20 14 280 Five n vamp.15 stayingin Barrow - - ---___ Kuukpik Catering Cook/Clean 5 12 80 Alutiq Camp Manager 1- - 12 12 _ Beacon Medic 1 12 12 _ Oasis Sample Catchers 2 12 _ 24 PRA Const Super 1 12 12 Stayit9 in Barrow -__ _ Pia PRA -___---- DSM _--2 12 24 PRA HSE 1 -- 12 12 PRA Geologist 2 12 24 ESTIMATED TOTAL DAILY LABOR HOURS: 1324 Total Personnel In Camp:66 Individual. -�_F/..., WALAKPA#11 DAILY DRILLING REPORT 1-Mar-12 { - Operator North Slope Borough Project Description • Barr''''Ga: Drilling F JI Well Site Leaders Don Breeden/Thor Kerb ted ,-,:,'.1,......7...,', Welt Name i Markin 811 CW Number 08-090 Cell Phew (907)980-4200 �-... ,r, AP18/AOGCC 50-023-20038-00.00 Land Use Permit I NSB Development Permit Office Phone (907)771-1002 (PTO 8) Rig Accept 13 Feb 2400 Rig Contractor I Kuukpik Drilling,LLC Kuukpik Dring Rig 45 Property Designation Wabkpa Well Site Phone (907)771.1021 Date/Time hrs Rig Release 1 _-_.- 055 th 4 4,845 MD-2,353 ND Target Date/Time (feet)rkb 9eDepth(feet) N rkb 5,335 MD 2,343 D HSE Phone (907)777-1025 Days on Well I 17 OART 080 fp 4.667 Operations N.ot 24- DM ahead according to dtactions provided by rigsite geologists Moura OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY start T Finish 4 Noun Description _-- Debit Deity I Tafel. T 6:00 7000 4.0 PN flax collars and RlH to shoe 1 Rig Up/Rig Down __- L_- 10:00 12.00 r 2.0 Circulate 13 392 and condition cold mud 2.Drilling 11.5 148.0 1200 14:30 2.5 Condition mud and circulate and reciprocate at shoe 3.R { ming _ - 14:30 I. 1530 1 0 RIH with elevabre.Wash down lost five stands 4.Coring 1530 18.30 1.0 Condition mud and circulate and reciprocate at 4250' S.Condition and Circulate 7.5 32.0 18:30 17:30 1.0 Pump low and high vis sweeps.Circulate at 4,250'until shakers cleanup 5.Tripe 5.0 80.0 17:30 Tag up end drill from 4,275'to 4,475' 7.Lubricate Rig 2,0 -.__. 0:00 • 6 5 Up=84k.Down=36k.Rotating=54k 8.Repair Rig 1.5 0:00 3.00 -- - 3,0 DM from 4,475'to 4,580' 9.C/O DrW Line 2.5 350 4.00 1.0 Circulate to decrease ECDs 10 D nwibn 3.5 / Maine V 4.00 6:00 2.0 DRfrom 4,580'b 11 W ehta Lop 4,845' - -- - - 12 Run Casing and Cement 27.5 13.Wait on Conant 14 Nipple up BOP 48.5 __ 15.Test BOP 19.0 _- - "'E13-15 Updab"' 18.Del Stan Tall Approximate volumes on hand:198 bbls water,110 blob drawl.1,480 blots waste fluid 17.PbObach Jerry Coleman in Barrow.Working an valve ktvesigaiion and mitigation plan 18.Squeeze Corneal 79.Fishing ' "'Current Weather"' 20.Directional Work Temperature:-25Fto-40 F.Wilde variabb-10 MPH 21 Other 23.5 TOTAL HOURS: 24.0 TOTAL HOURS: 24.0 384.0 DRILLING AND COMPLETION INFORMATION y,:... BIT NUMBER SIZE(in) MFG TYPE SERIAL NUMBER JETS DEPTH IN(ft) DEPTH OUT(0)' FEET GRADE OUT HRS OBD 1 121/4 71088 MIItWII 11/48526 306-1x12 48 1208 1160 1-1-01,1-1.0-70 28.34 40.93 2 81/2 11000 FX 2526 PDC 5013668 5x13 1208 _ 3426 2218 t+ t- 20.23 109.84 3 61/8 HOBS-QH1R WIND. 11582667 3013 3426 4275 849 0W10/1�77-15 45.45 18.68 _ 4 61/8 HOBS-C/HIR Mniteolh 11484396 3013 4275 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RKB CEMENT PROGRAM ( 1 Weight(ppf) Thread MD(h( ND(h) Contractor -- j CIP Type Comments Section OD in Grade Conductor 16 84 L-80 Welded 101.5 1015 Halliburton 26-0oc-11 @ 03:30 "C Permafrost TOC at 15 LI-tubed Surface Casing 9 5;8 40 L-80 BTC-M 1.193 1,135 Halllb rlon I 18-Feb-12 @ 06'.45 L&C Returns to Surface Int Casing � 7 26 L-80 BTC-M 3,415 2,256 Halllb rlon 1 24-Feb-12 @ 06'.00 G Plug bumped PUMP#1 1PUMP 62• LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer I Ellis Williams Manufacturer •TSM FL Temp(F) 64 Description Today Model WH-1000-A 1Model • TSMI000 Time 23.59 DEXTRIO LT(sack) 5 Liner BBL/STK(in) 5 00583 BBL/STK 98% 6 VI tlgl) ------ ---- ---- --- 10 Stroke ( ) �( �) 8.8 ALDACIDE G(5g pal) 1 Liner Size ' Stroke(in) 1 (b) � 9 VIS(sec/q1) 50 KCI(sack) 0 00/55 PV(cp) - -- 15 BARZANOPLUS(254) SPM 83 SPM c YPSbW00A°1 18 PAC{(sank) 1 GPM 203 GPM 0 Gels(lbs/100N2) 9/12,14 N-DRIL HT PLUS(sack) 0 _ PSI 1440 ''PSI --- 0 pH 10 N-VIS(254) 4 WELL CONTROL FIIVate WL lrrL/30 min) _ 5 NXS LUBE(55g drum) 0 - SPR Pump 41 20 spm @ 270 SPR Pump 02 20 spm @ 325 Sand 1%by vol) 1 CAUSTIC SODA(sack) 1. SPR Pump 41 40 spm @ 510 SPR Pump 82 40 spm @ 650 Solids(%by vol) T 1 2 XC-207(Bg jug) 1 FIT EMW(ppg) 13 LCM(ppb) 0 BARACARB 25(sack) 0 DRILL STRING AND HYDRAULICS CI(mg/L) 34000 SOLIDS CONTROL EQUIPMENT AVDP(fps) 216 AVDC Ifps) 337 Ca(mg/L) 60 Shaker Screens Hours Annulus(bbls) 94.7 WOB(k-Ib) 12 to 15 Cake(API 32nd inch) 2 Super G-120.120.120 3 24 Pipe(blob) 46.6 RPM Oto 70 PFI MF(ml) 0.01/0.6 Super G-120100.100 3 24 Pbk Up(k-b) 84 TFA u001 0.3889 Total Circ(bbls) 398 Super G-140,140,140 3 24 _ Slack Off(k-Ib) 36 dP System(psi) 1090 Hole(bbls) _--- 141 Centrifuge Speed Hours Jet Vel(fps) 169 XIP 0 Bit(psi) 225 Reserve(bbls) 171 Pit 3 Centrifuge 2300 6 BHA 550 ItemO � Description l OD(in) ID(In) Gauge(41) Top Connection Length(k( i Vendor Cumulative Length(8) BRT hours 1 HDBS QH1R m8tooN 5.900 2.000 6.125 P31/2 REG 062 HAL 082 2 43/4 SperryDMl 7/8 Lobe-1.5 degree with ABI 4.750 2.901 B 3 1/2"IF 38.22 HAL 38.84 3 Fbet sub 4,750 2.800 B31/2'IF 2.19 HAL 41.03 4 Spacer sub ,' 4.750 1.920 B31/2"IF 2.19 HAL 43.22 8 Regi b , wty/Gamma/HCIM 4.730 1.420 831/2 IF 2434 HAL 67.56 7 43/4"DM collar 4.750 2.610 831/2'IF 8.56 HAL 78.12 8 Neutron/Density tool 4.750 1.420 831/2'IF 2548 HAL 101.80 /4" IF _. _. 9 43/4"PWD 4.750 7.250 831/2"IF 9.18 HAL I 110.78 10 49/4"TM HOC 4.750 � 2.672 B 31/2"IF 1093 HAL ' 121.71 11 Circ sub with ball catchy 4.950 1.300 B 31/2"IF 11 41 HAL 133.12 __-.. _... 12 Flex caller 4870 2.250 B31/2"IF 31.04 HAL 184.18 13 Flex color 4.680 2.250 831/2 IF 31.00 HAL 19518 14 Flex collar 4.780 2.250 831/2 IF 30.90 HAL 22808 15 XO 4.970 2.500 64'Mod 2.84 HAL 228.70 --- 18 49/4"hydreufcjars 4.820 2.000 84"Mod 28.28 WFT 257.98 - 17 4"XT-39 HWDP 4.000 2.563 31.83 WFT 280.51 -- -- --- '' TOTAL BHA LENGTH: 289.81 MOST RECENT DIRECTIONAL SURVEYS MD INC AZ TVD +NI-S 061-IN I VS DLS Calculation VS Azimuth__ 4J82.38 85 94 256.10 233535 -666.61 -3006.02 3076 48 1 55 Minimum Curvature l 255.16 r _.. 4444.20 87.18 25391 2339.06 -682.58 -3085.82___- 313819 407 Minimum Curvature 25516 4509 01 86 37 252 07 2342 71 -701.51 -3127.49 3202 85 3 10 Minimum Curvature 255.16 FUEL CONSUMPTION KUUKPIK RIG 45 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 27-Feb-12 Customer Vol leas Customer Vol(gal) ' Customer Vol(Wll Customer Vol(gall Summary Quantities Vol(gal) Delivered Today 2,000.0 855(D) Kuukpk(D) 257.8 5.000 gallon Tank(G) Total Diesel Consumed 308.063.9 On Hand I oday 5.000.0 Della Lease(D) 240.5 Peak(D) 1715.5 123000-gallo Tank(D) , Total Gasoline Consumed 14 751.5 Used Tuday 2,2000 GBR() TlklgaglConam(D) 791.5 NSB Equipment(D) 1 Diesel Consumed Today 3,414.2 heed this Well 33,648.0 Halliburton(0) 207.7 Umiaq(D) 201.2 BGF(G) I 383 5 Gasoline Consumed Today 383.5 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company Position Count I Est Hours I Total Hours. Notes Incident Type Today F Comments Kuukpk Drilling Rig Crew i 22 1, 264 Illness 0 - Kuukpik Drilling Tool Pusher ' 2 12 24 Injury 0 HES-BSS Cementing9 13 111 Three in camp.Six slaying in Barrow Spill 0 I NES-Baroid Mud 2 13 26 Tunda Disturbance 0 HES-Sperry MWD/-WD/OD 4 13 52 Vehicle Damage 0 HES Supervisor 1 13 13 HES supervisor eta ting Barrow Near Miss 0 Conam Facades 20 12 240 II AN personnel sbNng in Barrow - - --- Umaq Ops Support 7 13 � 91 I Spill tech in camp.Al others in Barrow - -- vaWgcray Tate 2 12 24 Peak Rio Support 20 14 280 1Five in camp.75 shying in Barrow Kuukpik Catering Cook/Clean 5 12 80 Alutiiq Camp Manager 1 12 12 - - - Beacon Medic 1 • 12 12 --_-- _--_-i. Oasis Sample Catchers 2 12 24 PRA Conti Super 1 12 12 Stating in Barrow PRA DSM 2 12 24 -- PRA HSE --_ 1 12 12 - - _-- - PRA Geologist 2 12 i24 - - -- ESTIMATED TOTAL DAILY LABOR HOURS,1 1311 Total Personnel In Camp:S5 Individuals Mi...... WALAKPA#11 DAILY DRILLING REPORT 2-Mar-12 arrow Operator NoM Slope Borough Robot DandelionGas p,. I WMY SIM Leaden Don Breeden/Thor Ka1kWd 1®\4-'w"-���1 ---- `i�..- ISO Name WaIWW&*11 CE Number 88.090 Cell Phone (907)98W200 ..„.......,,ort API 81 AOOCC 50.0292003800-00 Land Us*Petit NSB Development Pam*R Office Phone (907)771-1002 (PTD i) Rig Accept 13 Feb @ 2400 R Contractor Kuu Ik Piing,LLC:Kuukpic Ddbt Date/Time hre NI kD 9. 9 Rq Property Deagnatiorh W abkpa Web Site Phone (907)771-1021 Rig Release f 00:00 Depth 4,708 MD 2,957 TVD Target Depth(feet)rkb 5.335 MD 2,343 TVD HSE Phone (907)771.1025 Date/Time (feet)rkb Days on Well 18 DART POOH Operations Neat 24- POOH.LAms.)BHA.Test ROPE.Haul mud to EB-15 TaBuild brine.Run Hours n with 4.5"slotted roar. OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start Finish Hours Description Dalai Daily I ToMI • 6 00 9 45 375 Doll from 4,845'to 4,708' 1.Rig Up/Rig Down 9:45 10 45 1.00 Circulate to lower ECDa 2.pibtg 3.75 140.75 10.45 12.00 1.25 Pull back to 4,380'to perfonn OH sidetrack 9.Reaming 050 0.50 _ 12.00 0.00 12.00 Attempt OH sidetrack Make other sidetrack attempt at 4,430'.Bit didn't bite 4 Coring -A - 0.00 0 30 0.50 Abandon sidetrack efforts Ream down to 4,708'n ole OH 5.Condition and Circulate 2.50 I 34.50 _... dry .._- 0:30 Circulate and pump high sus sweep.Monitor wet.Pump job.Blow down.Drop e.Tnpa _ 475 85.75 i rabbit 7.Lubricate Rig 1 - 2.00 2:00 • 1.50 I 2:00 4.30 2.50 Pull from 4,708'.10k over at4,2!10'.25k ova,between 3,895'10 3,812 Work areas until 8 Repair Rig I 1.50 • 4:30 5:00 0.50 drag subsided.Possibly swabbed gas B.CIO Drill Line 2.50 5:00 6 00 1.00 I Monitor well at shoe.Gas percolated,didn't flow.(les subsided.POOH 10.Deviation '. 3.50 ' 11,Wireline Log. - _ - - -- 12.Run Casing and Cement 27 50 "'AOOCC Update"' 13.Wait on Cement Notified Jell Jones ROPE Mal will boon Friday.Jamie/ad witness 14.Nipple up BOP 46 50 -- - - ----- 15.Test BOP 19 00 ' _ _. "'E&10 Update"' 10.Ori!Slam Test _.... . Approximate • vobmea on hand:198 lobi weir,110 Able diesel,1,580 Able mete fluid 17.Plugback -.-..-_ - I ---_ -_ - _-_ -- 18.Squeeze Cement 19.Fishing ".Current Weather"' 20.Directional Work j 11.50 1150 ' Temperature:-25 F to-40 F.Winds variable-15 MPH 21 Other 0.50 25 50 TOTAL HOURS: 24 • TOTAL HOURS: 24 410 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG TYPE SERIAL NUMBER JETS DEPTH IN(ft) DEPTH OUT(ft)1 FEET r GRADE OUT 1 HRS OBD FT/HR 21 12 1/4 FIDEIS HOBS FX 2528 0 11748526 3916-1012 48 1208 1160 t WT A L r-NO-1D' 28.34 40.93 I : 5013668 5x13 1208 3426 2218 o-LTSX-t-Nam 20.23 10964 3 6118 HDBS-QH1R M,IItooM 11562667 3013 3426 4275 1 849 1-2.1"-A-E-1-CT-111i 45.45 18.68 4 6118 HD85OH1R Milltaoln 11484396 3013 4275 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM MEI CEMENT PROGRAM r GIP Type Comments Section OD(in) _W i�84�ppl) , Thread MD(ft) TVO Contactor - .',0330 'C'Permafrost Conductor 16 84 LOULBO Welded _101 5 101.5 MalYb non 26-Des-11 TOC at 15'•U-tubed Sun Casing 95/8 40 L-80 BTC-M ) 1,193 1,135 Hallo rton 1 18-Feb-12 a.06 45 L 8 C Returns leSurface Int Casing 7 28 L-80 BTC-M 1 3,415 2.256 HalibuMe I 24 Feb 12 q 06 00 G Plug bumped 11 PUMP 81 PUMP 82 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer ' Ellis Wiilums Manufacturer ISM FL Temp(F) 68 Description Today Model WH-1000-A Modal TSM1000 Time 23.59 DEXTRID LT(sack) 50 Liter Sim(n) 5 Liner Size(In) ti Weight(lbs/gal) 8.86 ALDACIDEG(Sg pall) 0 Stroke(n) 10 Stroke(in) 5 VIS(sec qt) 58 KCI(sack) 34 88L/STK 98% _ 0.0583 BBL/STK @ 9602 00/55 PV(cp) 22 BARZAN D PLUS(250) 0 SPM __ 83 ISPM 0 YP(bdlWfld� I 24 _PAC{(sack) 20 GPM 203 !GPM o Gels(bW00fltt II" 8/12/14 N-DRIL HT PLUS(sack) 0 _{ PSI 1380 PSI v pH 10 N-VIS(25#) 14 WELL CONTROL �P4-ele WL(mL/30 min) 4.8 NXS LURE(55g drum) 0 SPR Pump#1 I 20 rpm @ 270 SPR Pump 02 20 spm @ 325 Sand(%by vol) 0.25 CAUSTIC SODA(sack) 2 SPR Pump#! 40 cpm @ 510 SPR Pump 42 40 spina 650 Solids(%by vol) 1.5 XC-207(89 jug) _-_ 0 FR EMW(ppg) , 13 LCM(ppb) 0 BARACARB 25(sack) 0 DRILL STRING AND HYDRAULICS CI(mglL) 31.000 SOLIDS CONTROL EOUIPME AVDP(fps) 223 AVDC(fps) 348 Ca(mgtn W ) 40 Shaker Screens Hours Ann (blots) 994 WOB(k-lb) I 12lo15 Cake(API 32nd inch) 2 SuperG-100,100.100 3 24 Pipe(blots) 40 1 RPM 0 PF/MF(ml) 0.1/0.8 Super G-100,100.100 _ 3 24 Pick Up(k-lb) 60 TFA liWl 0.3889 Total Circ(Able) 390 Super G"140,140.140 3 24 Slack Off(k-Ib) 40 dP System(psi) 1283 Hole(blots) 149 Centrifuge Speed Hours _.._. -. Jet Vol(fps) 175 dP @Bit(psi) I 243 Reserve(Able) 184 Pa 3 Centrifuge 2300 24 BHA 500 Item Description OD in 101111 Oau M To Connection Length(lit) Vendor Cumulative Length(ft) BR7 hours p 00000 _ P( 1 P. 1 •HOBS QH1R mlltoolh 5.900 2.000 8.125 P31/2'REG 0.82 HAL 0.62 _._. - 1 _.'-_-- -- 2 4 3/4"Sparrytkdl 7/8 Lobe-1.5 degree with ABI 4.750 2.801 B 31/2"IF 38.22 I HAL 38.84 • 3 Float sub 4.750 2.800 B 912'IF 2.19 HAL 41.09 4 Spacer sub 4.750 1.920 B 31/2'IF 2.19 , HAL 49.22 --_ - _1 ._. ._ 8 Reeir6viy/Gamma/HCIM � 4.730 1.420 B 31/2-IF 24.34 HAL 87.58 7 4 3/4"DM molar 4.750 2.810 - B 3 1/2"IF 8.58 HAL 70.12 8 !Neutron/Density Mol 4.750 j 1.420 831/2"IF 25.48 HAL 101.80 9 43/4-PWD --_---4.750 1.250 _ 631/2"IF 9.18 HAL 110.78 10 4 3/4"TM HOC 4.750 2.812 B 31/2"IF 10.93 HAL 121 71 • 11 Ciro sub with bel Gaither 4.950 1.300 B 3 1/2"IF 11.41 HAL 133.12 12 _ Flex collar 4.870 2.250 B 31/2'IF 31.04 HAL • 16418 13 Flex collar _--- 4.680 ) 2250 I _ B 3 1/2 IF 31.00 HAL 195.16 - --- -_ :Flex -__-- 14 collar 4.780 2.250 831/2 IF 30.90 HAL 22806 15 'XO 4970 2.500 I B 4'Mod 2.84 HAL 228.70 18 4 39draulP 4.00 2.000 TOTAL BHA LENGTH:i 363 WET 28786_ 17 4"XT-39 HWDP 4.0000 2.563 • 31163 WET 28881 288.81 MOST RECENT DIRECTIONAL SURVEYS MD INC AZ TVD j -lb 15 OEI-W I VS DLS Calculation .�. VS Azimuth mu 4571.10 ----- 85.94 25305 2348.87 -720.07 -3188.50 3204.73 172 Minimum Crvature 255.10 483169 85.32 250.10 2351.49 -799.19 -3243.92 j 3325.02 4.88 Minimum Curvature 255.10 470800 ,- 85 32 250 18 235772 1 -704.95 -3315.46 3400.79 0.00 Projected to 7D 255.18 FUEL CONSUMPTION KUUKPIK RIG 85 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:1 29-Feb-12 Customer 1 Vol(pallCustonwr I Vol(gal) I Customer Vol(gal) Customer Vol(gal) Summary Quantitws Vol(gal) Delivered Today 4,000.0 OSS(D) Kuukp,k/0/ 3322.6 5,000-gallon Tank(G) Total Desel Consumed 314.400.3 On Hand Today 6,600.0 Delta Lease(D) • 396.8 Peal(D) 1439/ 23,000-gallon Tank(D) 1 Total Gasoline Consumed 14,970.5 Used Today 2,400.0 GBR(D) Tik,gaq/Conam(D) 574.7 NSB Equipment(2) Diesel Consumed Today fi 8,338.4 Used this Well 36,048.0 Hamburton(D) 438 6 (Imlay(D) 164 0 BG7 IG) 219.0 Gasoline Consumed Today 1 219.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company 1 Position �- Count [Est Hours Total Hours, Notes Incident Type I __Today _ Comments_ Kuukpik Drilling •Rig Craw 22 12 264 Illness Tool Pusher 2 12 24 Injury - _-- -_--- KuukpikDrdling HES-BSS •Cementing 9 ' _ 13 117 Three in camp.Se staying in Barrow Spill E !Mud 2 13 26 Turtle Disturbance HES-Baroid MES-Sperry MWDILWD/DD 4 13 52 I Vahfde Damage HES !Supervisor 1 1 13 13 MES supervisor laying in Barrow Neer Miss Conan Facilities 20 I 12 240 Al persOnnel stanng in Bow�- Umiaq Ops Support 7 13 91 Spill tech in camp.All others in Barrow Vetco Gray Tach 1 12 12 Ty Knutson left 0l-March - Peak Rig Support 19 14 280 Five in camp.14 staying in Barrow Kuukpk Catering Cook/Clean S 12 60 /Web Camp Manager 1 12 12 Beacon --- Medic 1 --12 12 r Oasis Sample Catchers 2 12 24 _ ----- PRA Comet Super 1 12 12 1taytn9 in Barrow PRA DSM 2 12 24 rIll PRA HSE 1 -_12 12 PRA Oeobgist 2 12 24 - - ES7MIA7EDTOTAL DAILY LABOR HOURS: 1285 Total Personnel In Camp:54 Individuals y,OPE7 go, WALAKPA#11 DAILY DRILLING REPORT 3-Mar-12 i/ �f, L < Operator lor NOSlope Borough Project Description Go � [Well I 8Leaders Doh Breedon/Thor Kaieslad W9 Naroe Walakpe#11 CIP Number 88-090 Cell Phone 1 (907)980.4206 API#/AOOCC „yMren 50-023-20038-00-00 Land Use Permit NSB Development Permit Office Phone (907)771.1002 (PTD#) Rig Accept 13 Feb @ 2400 Rig Contractor Kuukpik Drilling,LLC:Kuukpir Drilling Rig#5 ProperlyDesignation Walakpa Well Site Phone (907)771.1021 DatelTime Ma Rig Release 80t00 Depth TD G 4.708 MD 2,357 TVD Target Depth(feel)rkb 5.335 MD 2,343 IVO HSE Phone (907)771.1025 Dale/Time (feel)Mb Days on Well 19 DART RIH with 4.5"abtled her -800' Operations Next 24- RIH with 4.5'slotted liner.M/U- firing and RN hanger/packer.RIM on DP. Hours Tag up on bottom.Circulate.Displace.Drop bat L/D DP sideways OPERATIONS SUMMARY • 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start Finish Hours Description --- _ - Detail Daily 1 Total 6:00 7 30 1 5 Monitor percolating gas t shoe.Percolation subsides.Pull from shoe l0 2,300' 1 Rig Up/Rig Down g-.. 7:30 10:00 2.5 Circulate gee and cuttings out of waN.Monitor well.Pump dry job.Blow down 2.Drilling '. 149.75 10.00 12:00 I 2.0 Pull from 2.300'to jars at-280' 3.Reaming 0.50 _ 12:00 15:30 ' 35 UD BHA,jars and flan collars.Unload porosity tool sources and download LW()memory 4.Coring 15:30 18:05 0.5 IClicar and clean floor.Monitor welt 5 Condition and Circulate 1.5 36.00 16:00 18:00 2.0 WU tostjoint and pull wear bushing 8 Trip 6.5 92.25 _ 16 00Teal BOPE.Bag to 250/2,500.Top and bottom rams to 250/3,500.Test OCR.IBOPupper, 7.Lubricate Rig 2.00 ower floor valve,dart valve.k#,and choke manifold to 250/3,500.Perform koomey teal 8.Repair Rig 3.0 4.50 22:30 4.5 Test manual and hydraulic choke 9.C/O Drill Line 2.50 --_ -' 22:30 0:00 1.5 Choke hose developed bale.C/O same.Monitor well 10.Deviation 3.50 0:00 1:30 1.5 !Warm and instill new choke hose.Monitor well 11.Wireline Lap 1:30 2:00 0 5 Install lest plug R/U to lest 12 Run Casing and Cement 2.5 30.00 __... -.. ... .__ .. 2:00 2:30 05 !Test bind ramal)250/3500.Teel new choke hoseeat same time __- 13.Wail on Cement 2:30 3:30 II 1.0 i Pull last plug.Install wear mg_Blow down choke and MI Ibex 14.Nipple up BOP 3.0 49.50 3:30 4:00 � 0.5 i kVU safety sive for running 4.5"slotted year 15.Test BOP 5.5 24.50 4:00 5:00 � 1.0 R/D OP tongs and elevators._R/U elevators and tongs to run 4.5-slotted liner 18.Drill Stem Teat 5:00 6:00 1.0 RIH with 4.5'stilled liner 17.Plugback 18.Squeeze Cement -_ "'EB-15 Update 19.Fishing Approximate volumes on hand:343 blob water,110 blob diesel,1,878 blots waste fluid 20.Directional Work 17.50 "`Current W th "' 21.Other 2.0 27.50 TOTAL HOURS: 24 Temperature:-20 F to-35 F.Winds variable-10 MPH TOTAL HOURS: 24 434 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) t MFG TYPE I SERIAL NUMBER JETS I DEPTH IN(M) DEPTH OUT(M). FEET GRADE OUT HRS OBD FT/HR 1 12114 HOBS Millodh 11748526 3016-1012 48 1208 1160 10 28.34 40.93 2 8112 HOBS FX 2526 PDC 5013668 __5013 1208 3426 2218 2023 109.64 v 1;8 H085-0H1R 81, 11562887 _ 3013 3426 4275 849 45.45 18.68 4 6 1,8 HDBS-QHIR Mi roots 11484396 3013 4275 4708 433 - t-t HO To 10.72 40.39 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RKB _ CEMENT PROGRAM Section OD(in) Weight(ppf) Grade ' Thread 1 -MD(ft) TVD nl) _ Contractor CIP Type Comments Conductor 16 84 L-80 Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03:30 "C"Permafrost TOG U-15'-U-tubed Surface Casing 95,'8 40 LOU- BOC-51 1,193 1,135 Halliburton 18-Feb-12@06:45 LSC Returns to Surface Int Casing 7 26 L-80 BTG-M 3,415 2,256 Halliburton 24-Feb-12 Q 08:00 G Plug bumped PUMP#4 ' PUMP#2 LOW SOLIDS NQN-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer Ellis Williams Manufacturer TSM FL Temp(°F) 09 Description Today Model Model StrokeSi WH 1000-A IStro a n -_. _ BBL/STK �% T_SM1000 Time 23.59 DEXTRID LT(sack) 0 Liner Size(n) r-- 5 Ener Size on) 4 6 Weight(lbs/gal) -...-- 8.9 ALDACIDE G(Sg pal) 0 ) ( ) 8 VIS(sec/gl) 48 KCI(sack) +-. 12 BBL/STK G 98% 0.0583 0 0.0755 PV(op) 15 BARZAN D PLUS(25#) _3 SPM 0 ISPM 0 VP�baH OOk') _,.., 18 PAC{(sack) 0 GPM 0 I GPM 0 Gt�bs/1o0flt) 8/10/13 N-DRIL HT PLUS(sack) 0 PSI 0 _PSI 0 pH 9.2 N-VIS(250) 0 - _ -- WELL CONTROL Filtrate WL(mL/30 min) 4.1 NXS LUBE(55g drum) 0 Pump SPR Pump#2 N/A Sand(%by vel) 23 015 SALT-SOLAR(sack) SPR Pump#1 N/A I _ SPR Pum 01 N/A !SPA Pump 52 N/A Solids(%by vol) 2.3 DESCO Chrome Free(250) 4 FIT EMW(pug) 13 LCM(ppb) 0 BARACARB 25(sack) 100 • DRILL STRING AND HYDRAULICS Cl(mg/LI 28,000 _ SOLIDS CONTR.�L EQUIPMENT AVDP(fps) 0 AVDC(fps) 0 Co(mg/L) I 160 Shaker Screens I_ Hours Annulus(blots) N/A :WOO(k-Ib) 0 Cake(API 32nd inch) 1 Super G.100,100,100 3 11 Pipe(blots) N/A RPM 0 PF/MF(mn 0.01/0.5 Super G-100.100,100 3 11 I Pick Up(k-Ib) 0 TFA lint) ! 0.3889 Total Circ(blob) 333 Super G-140 140 140 3 11 Slack OH(k-Ib) 0 dP System(psi) 0 Hole(blots) 178 Centrifuge Speed Hours Jet Val(fps) 0 •dP @ Bit(psi) I 0 Reserve(bbls) 400 bbl KCI/NaCI build underway Pit 3 Centrifuge 2300 2 Current BHA _-- Kern Description OD(in) ID fin) Gauge(In) _Top ConnectionLength (ft) f Vendor I C ulave Length(ll) BRT hour _ -- ' TOTAL BHA LENGTH: 0.00 I - --- MOST RECENT DIRECTIONAL SURVEYS MD INC AZ TVD +N/-S +E/-W VS DLS ', Calculation VS Azimuth 457110 8594 25305 2346.87 -720.07 -3186 59 326473 1.72 Minimum C lure 25516___ -. 4631 69 � 85 32 250.16 2351.49 -139.13 -3243 92 3325 02 4.86 Minimum Curvature I 255.16 4708.00 85.32 25018 1 2357.72 -764.95 -3315.46 3400.79 ' 0.00 Projected to TD 255.16 FUEL CONSUMPTION KUUKPK RIG 45 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT.' 1-Mar-12 pYssMnNiop_. I Vol IgaR Customer vol Igen Customer vol(gall Customer Vol Iraq Summary Quantities vol(gal) Delivered Today 0.0 BSS(D) Kuukpik(D) 2402.2 5 000-gallon Tank(GI Total Diesel Concerned 320 112.2 On Hand Today 4,300.0 Dalt Lease(D) 236.8 Peak(D) 1872.8 23,000-gallon Tank ID) Total Gasoline Consumed 15.328.5 Used Today 2,300.0 GBR(D) Tlki9aglConam(D) 750.4 ,NSB Equipment(D) Diesel Consumed Today 5.711 9 Used this Well 38348.0 Halliburton(D) 245.3 '!Umiaq ID) 204.4 !BGE(0) 358.0 Gasoline Consumed Today 356.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company Position _ Count Est Hours .Total Hours! Comments Notes Incident Type Today i Conents enb Kuukpik Drilling gig Crew 22 12 264 Illness 0 Kuukpik Drilling Tool Pusher 2 _ 12 24 Injury 0 HES-BUS :C entng : 9 13 117 'Three in camp.SO staying O Barrow Spill 0 - - HES-Baroid A_M d I 2 13 26 Don Urbabeh out CaaayGuidry In Tunde Disturbance 0 HES-Sperry IMWD/LWD/DD 1 13 • 52VehicleDamage 0 HES Supervisor 1 13 13 HES supervisorrstaying in Barrow Neer Miss _ 0 Conam _Facilities 20 12 240 AN personnel staying to Barrow Umiaq Ops Support 8 13 104 SPIT tech in camp.Al others in Barrow Velco Gray Tech 1 12 12 Peak Rig Support 17 L-14 238 Five in camp.12 stalring in Barrow Kuukpik Catering Cook/Clean ', 5 .12 60 Aluliiq Camp Manager 1 12 12 Bmcon Medic 1 12 7 Baker Hughes Liner 1 15 15 Both Oasis sample catchers left 02-March PRA Const Super 1 I 12 12 Staying in Barrow PRA 1DSM 2 T-12 24 -- PRA HSE 1I-_.,.12 12 GBR 'Casing 2 15O 30 Both PRA geologists left In Camp: illitill ESTIMATED TOTAL DAILY LABOR HOURS:- 1267 Total Penoneel In Camp:53 Individuate -no WALAKPA#11 DAILY DRILLING REPORT 4-Mar-12 ff �'G.L'm Iz Operator North Slope Borough Project Description Ba Dino F ill Well Site Leaders Don Breeden/Thor Kakeled � son 'g_;"4 Well Name WNekpa#11 CIP Number 68-090 Cell Phew (907)980.4206 '�„..r„tr,r, API#IAOGCC 50-023-20038-00-00 Land Use Permit NSB Pho Development Permit O (PTD#1 D Ont.ph.. (907)777.1002 Rig Accept 13 Feb @ 2400 Rig Contractor Kuukpik _Deb/Time i hra Wing,LLC:Kuukpik Drilling Rip#5 Property Designation W Wkpa Well Site Phots (807)771-1021 Rig Release 08:00 Depth Date/Time (feet)rkb TO®4,708 MD 2,957 ND Target Depth(Nen rkb ,9 ND MD 2,34D NSE Phone (907)771-1025 Days on Well 20 DART UD OP anger Operation Next 24- Continue LID DP.LID Baker runnnq tool.L/D inner string.RIM w/remaiting Nouns Stands#I derrick.UD DP.Run and hang 2 7/8'tubing.Clean pile OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTNDY SUMMARY ,-._._.- Blair FinishI Hours Description NUN Daily Total 800 8.00 I 2.0 RIH with 34 slotted 4.5"joints and 3blank 45"pups i.Rip Up/Rip Down 800 9:00 1,0 'RAJ to run 27/8inner sting.R/U fol table nd 2-7/8elevators.M/U slick stinger 2.Drilling 149.75 9:00 12:00 3.0 RIH with 45joints of 2-7/8"work string.P/U hangar assembly.C/O l0 3.5 elevators 3.Resmnq 0.50 1200 14:00 2.0 Space out tubing Decker 4.Coring 14.00 14:30 0.5 P/U one stand.Circulate 4O blob le clear tubing 5 Condition and Circulate 3.5 99.50 14:30 17:00 2.5 I RIM to 3,378' 6.Tripe 9.0 101.25 17:00 18:90 1.5 {'Circulate.Sips up from 1 bbpmin b 5 b_blslmin 7.Lubdcate Rig 0.5 2.50 18:30 20:30 2.0 RIH on elevators from 3,378'to 4,507' _ -8.Rapala Rig 1.5 600 • 2030 21:00 0.5 IBroke hydraulic coupinp on top drive.Raplaw acme 9.CIO Doll Line 2.50 21:00 22:00 I 7.0 RIH horn 4.507'on elevators.Tag on depth at 4,708'.Only leek wtlphl pt Mal stand 10.Deviation 3.50 22:00 0:00 2.0 Spaw out Circulate.Stage up horn 1 bbl/min to 5 bbWmn.Dieplaw to brie 11.Wireline Log • _ 0 00 030 0,5 Drop ball and tel packer by at 3,237' 12.Run Geeing and Cement 8.0 38.00 _.. 0:30 7:30 1.0 Pressurelest backside to 2,500 poi for 5 minutes.Good test Bleed off.Blow down 13.Waft on Cement __ 1:30 2:000.5 RN to L/D DPONnb_R/D rauf elevators Tie back tugger 14.Nipple up BOP 49.50 - - --_ - _ 2:00 2:330 0.5 iLubriceta ng 15.Teal BOP 24.80 2:30 3:00 05 LID DP singles 18.Drill Stem Teat - 3:00 4:00 1.0 Fuel line on HPU2 sprung a leak.Shut off and repair.Clean epi 17.PWgback --1:00 0:00 2.0 OD DP singles 18.Squeeze Cement _. 4 _ "'EB-15 Update"' -.. 19.Fishing Approximate volumes on hand:343 blots water,205 blots diesel,1,959 blots waste NO 20.Directional Work 11.50 '"Current Weather"' 21.Other 7 1.5 29.00 TOTAL HOURS: 24 Temperature:-20 F l0 35 F.Winds variable-10 MPH TOTAL HOURS:t 24 458 DRILLING AND COMPLETION INFORMATION BIT NUMBER SIZE(in) MFG TYPE SERIAL NUMBER I JETS DEPTH IN(ft) DEPTH OUT(h) FEET GRADE OUT FIRS OBD FT/HR 1 _ 121/4 ROBS M/ltmm 11748526 3016-1012 48 1208 1160 /-r-WT-ME-t-No-TD 28.34 40.93 2 1 81/2 HDBS FxL 2526 PDC 5013668 5x13 1208 3426 2218 aT41x41 -tD-TO 2023 10984 3 01/8 E HDBS-QHIR Malooth 11562667 3x13 --_- 3426 4275 849 14wn.u-E-1Cr.ee 45.45 18.68 4 61/8 HDBS-OH1R Mlllteoth 11484396 3x13 I-- 4275 4708 433 I-z-WT-4E-1-110.TD 10.72 I 40.39 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RK B CEMENT PROGRAM Section OD(in) Weight(ppf) Grade Thread I MD(h) I TVD(ft) Contractor CIP Type I Comment. Conductor 16 84 L-80 Welded 101.5 101.5 Halliburton 28-Dec-11 @ 03:30 "C"Permafrost TOC at-15-U-tubed Surface Casing 9 5/8 40 L-80 BTC-M r 1,193 1,135 Halliburton 18-Feb-12 @ 0845 L&C Returns to Surface Int Casing 7 26 L-80 BTC-M 3,415 2,258 Halliburton 24-Feb-12 @ 00.00 G Plug bumped Slotted Liner 4 1/2 128 L-80 BTC 4701 2,357 Baker Hughes Top of SLZXP Packer/4.`i'Liner @ 3,237' No Cement I. PUMP#1 1PUMP#2 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS - Manufacturer Ellis Williams Manufacturer TSM FL Temp(°F) Description Today Model WH-1000-A Model TSM1000 Time Walakpe 11 displaced to brine DEXTRID LT(sack) 0 Liner Size(n) 5 Liner Size(n) 0 Weight(lbs/gal) Used Baradnll being hauled to EB-15 ALDACIDE G(5g pail) 0 Stroke(in) 10Stroke(in) 9 VIS(sec/qt) Pits being cleaned KCI(sack) _ 82 BBL/STKA_96% 0.0583 )BBL/STK @98% 0.0755 PV(op) 1 BARZAN D PLUS(25#) 0 SPM 0 SPM 0 yp(6d10011z) PB cleaning will continue PAC-L(sack) 0 GPM 0 GPM 0 Gels(Ibd100ftz) Vac trucks will continue haul obs N-DRIL HT PLUS(sack) 0 PSI _-� 0 'PSI 0 ----- pH - Mud system soil be prep-ed for move N-VIS(25#) 0 WELL CONTROL F'lSeto WL(mL/30 min) NXS LUBE(55g drum) 0 SPR Pump 61 N/A SPR Pump 02 INIA S nit(%by vol) SALT-SOLAR(sack) 105 SPR Pump#1_ N/A SPR Pump 02 N/A Solids(%by vol) DESCO ChromeFee(250) 0 FIT EMW(ppg) I 13 LCM(ppb) BARACARB 25(sack) 0 DRILL STRING AND HYDRAULICS CI(mg/L) SOLIDS CONTROL EQUIPME AVDP(fps) 0 AVDC(fps) 0 Ca(mg/L) Shelter Screens Hours _ Annulus(bbls) N/A WOO(k-Ib) 0 Cake(API 32nd inch) Super G-100.100 100 3 18 Pipe�hbb) WA RPM 'I 0 PF/MF(ml) Super G-100,100 100 3 18 Pick Up(k-/b) 68 TFA(in0) 0.3889 Total Crc(bbla) Super G-140,140.140 3 18 Slack Off(k-lb) 38 dP System(pa) 0 Hole(blots) { 124 blots,above packer Centrifuge Spend Noun Jet Vel(fps) • 0 dP LTU Bit(psi) t 0 Reserve(bbls) Pd 3 Centrifuge 2300 0 __ Current BNA Item Deaarlption OD On) ID(la) Gauge(in) Top Connection I Length(11) Vendor Cumulative Length(ft) BRT hours TOTAL BNA LENGTH: 0.00 : MOST RECENT DIRECTIONAL SURVEYS MD INC AZ ND 1 eft/-8 lI 1 VS DLS 7 Calculation VS AairrlMr. va 457110 85.94 253.05 2348.87 720.07 -378859 I 3264.73 172 Minimum Curture 255.10 4631.60 85.32 25.018 2351.49 -73813 I -324392 3325.02 486 ' Milium Curvature 255.10 -764.95 3315.46 3400.79 0.00 Pro --_-- 4708.00 � 85.32 250.78 2357.72 - Projected to TO 255.18 FUEL CONSUMPTION KUUKPIK RIO#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT:( 2-Mar-12 Clessiisation 1 Vol(gall customer Vol lean Customer Vol Wan CustomerVol(gal) Summary Quantities Vol(gel) Delivered Today 2.300.0 BSS(0) Kuukp k(D) 380 2 5 000 gallon Tank(G) SummaryT lel Desel Consumed 323 071.8 ' On Hd Today _4,800.0 Dehio Lea (DZ I 2357 Peak(D) 1760.6 23.000-gallon Tank(D) 111 Total GNn Consumed 15612.5 Used Today 1 2,000.0 GBR(D) 10 0 7lkpaq/Comm(D) 7 t 3 7 NSB Equipment(D) Di aed Consumed Today 3,759.8 Used this Well 40,348.0 H.IE,orlon(D) 431 1 �Umiaq(D) i 228 3 8GF(G) 288.0 Gasoline Consumed Today 288.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY -.. _ Company Position Count ', Est Hours (Total Hours I Notes Incident Type Today IComment. Kuukpik Di illnl9 Rig Crew 22 12 254 Illness 0 Kuukpik 0i111m9 Tool Pusher 2 12 24 Injury 0 HES BSS Cementing 9 13 117 Three in camp.Six staying in Barrow Spill 1 See notes HES-Scrod Mud 2 _ 13 f 26 T'p Jacks leaving today Tunda Disturban. 0 HES Sperry MWD/LW D/DD 4 13 - 52 AN four lea g today Vehicle Damage 0 HES _- Superwor 11_ 1 13 13 HES sup staying inBarrow Near Miss -�----p �- - ---- Conam Facilities I 20 12 240 AN personnelstaying In B - - - - --- • Smog Ops Support 8 13 104 Spill tech in camp.Al others in Barrow Spill Notes:Diesel fuel supply line on HPU2 ruptured.It was Vete°Gray Tech 1 I 12 12 caught promptly.Approximately 2-gallons spilled before the Peek Rig Support 18 14 252 Five in camp.13 staying in Barrow source was shut off.Spilled material was cleaned and rig ops Kuukpik Catering Cook/Clean 5 12 80 resumed. AIutq Camp Manager 1 12 12 --- - - - - Beacon Made 1 12 12 Baker Hughes Liner 1 15 15 PRA Conal Super 1 12 - 12 Staying in Barrow PRA DSM 2 12 24 -. -_ PRA HSE 1 12 12 GBR Casing 2 15 30 _ ESTIMATED TOTAL DAILY LABOR HOURS: 1281 Total Personnel in Camp:531ndNiduab - Mx. WALAKPA#11 DAILY DRILLING REPORT 5-Mar-12 Barrow(Sar # m operator North Slops Borough Project DescriptionrowDrilCi H Wen Site Leaders Don Breeden/Thar KaYsetad i0 ry' Wel Name Watekpa#11 CIP Number 68-090 Cell Phone (007)080.4206 ..+._.....- API/IAOOCC 50-023-20038-00-00 Land Use Permit NSB Development Permit Office Phone 037)771-1002 -. (PTD/) Rig Accept 13 Feb @ 2400 Rig Contractor Kuukpik Doing,LLC.Kuukpk Drilling Rig/5 Property Designation --Walakpa Weil Site Phone (007)771-1021 Date/Time hrs Rig Rekue 06:00 Depth TO @ 4,708 MD 2,357 TVD Target Depth(Mt)drb 5,335 MD 2.343 TVD HSE Phone (007)771-1025 DaterTlme (feet)rkb I • Days on Well 21 OART 5105015 to MD BOPE Operations Next 24- N/D BOPE.N/U.Freeze protect.Haul realms horn pita to EB-15.Clean pita Hours Prepare rig for move OPERATIONS SUMMARY 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY SbdIFinish Hours Description Detail DaiDailyTotal 800 8.30 25 Lay down drill pipe 1 Rig Up!Rig Down 8:30 9'.00 0.5 Rig up power tongs to lay down 2-7/8"inner work smog 2 Dolling 149 75 -- _ 9.00 10:00 _�_ 1.0 Lay do p assembly --- 3 Reaming • 0.50 10:00 12.00 2.0 Lay down2-7/8"inner work string 4 Coring 12:00 12.30 0.5 'Lay down tubing tongs and pick up elevators to RIO weh DP stands from derrick S Condition and Circulate 39 50 12:30 T 14:00 1 5 •RIH with 13 stands 6.Trips _--- 9.5 11(i 75 _- _- 14:00 18:00 2.0 Lay down sire pipe 7 Lubricate Rig 2.50 1600 00 ( Pick up 2-718'joint and XO to pull wear bushing.Install teat plug.C/O upper rams b 8 Repair Rig 6.00 20:00 4.0 2-7/8'and test me b 250/3500.Good test 9 CIO Drill Line 2,$0 2000 20130 0.5 Rig up floor to RIH with 2-7/8'tubing string 10 Donation 3.50 2030 0:00 3.5 M/U WLEG tailpipe to 2-7/8"joint.RIH with total of 97 tubing jont. 11 W uelne Lop 0:00 I 7:00 1.0 Land and hang 2-7/8"tubing.Tighten kickdowns 12 Run Casing and Cement 0.0 44.00 1:00 1'.30 0.5 Back off and lay down landing joint 13.Wait on Cement 1:30 200 0.5 Install ono-way check.Realized XO backed off landing joint 14 Nipple up BOP 6.0 55.50 2.00 3:30 1.5 Pick up landin joint M/U to hap g join ger.Pull hangar.Inspect and C/O 0-ring and packing 15.Teal BOP 24.50 3.30 4.00 _ 0.5 Land and hang 2-7/8"lobing hten lockdowns.Install one-way check.L/D landing joint 16.Drill Stem Teat 4.00 5'.00 1.0 0/0 2-7/6"rams to 4"rams 17.Plugback ._ ... eevators�i __ -- ---.__-- 5:00 8:00 1.0 qa.Bleed off HPU.Unhook rotary hones Pull rotary table 18 Squeeze Cement "'EB-15 Update"' 10 Fishing Approximate volumes on hand:343 bbls water,205 bills diad,2,557 bble waste fluid 20.Dlrecmnal Work _11.50 "'Current Weather.." 21.Other 2.5 31.50 TOTAL HOURS: 24 Temperature:-25 F to<0 F.Winds variable-10 MPH TOTAL HOURS: 24 462 DRILLING AND COMPLETION INFORMATION B0T NYMIBER _ SIZE(In) • MFG TYPE SERIAL NUMBER JETS DEPTH IN(h) DEPTH OUT(ft) FEET GRADE OUT HRS OBD FT/HR 1 121/4 HOBS MJltooth 11748526 3x16-1x12 48 1208 1160 t-t-wTA-E-t+a-TD 2834 4093 -___... 7----- 2 81/2 HOBS FX 2526 PDC 5013666 5x13 1208 3428 2218 aCT sx t4a.TD 2023 10964 3 87/8 1/DBS-0H1R Meltoom 11562667 3x13 3428 4275 8491 T E1Cr.nH 4545 18.68 4 61/B HD6 S-0111R r.Luloom 11484396• 3013 4275 4708 433 i.7.W r.a.E.1,1O.rD, 10.]2 40.39 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RKB CEMENT PROGRAM Section I OD(In) Weight(ppf) j Grad. Thread MD(ft) I TVD St) Contractor CIP Type I Comment. Conductor 16 eq L-80 Welded 101.5 1 101.5 Halliburton 28-Dec-11 Til 03:30 C Permafrost TOC a1-75 U tubed Surface Casing 9 5/8 40 1 L-SU BTC-M 1.193 1 1,135 Halliburton 18-Feb-12 @ 06:45 L&C Retume to Surface_ Int Casing 7 26 L-80 BTC-M 3,415 2,256 Halliburton 24-Feb-12 @ 06.00 G Plug bumped Slotted Liner 41/2 12.6 1 L-80 BTC i 4,701 ' 2,357 Baker Hughes Top of SLZXP Packer/4.5"Liner @ 3,237 MD No Cement Comp Tubing I 27/8 6.5 . L-80 EUE 1 3,137 I 2,174 Tailpipe assembly terminates with 6.5e wireline entry guide No Cement PUN #1 r PUMP 82 LOW SOLIDS NOtN.OME®MIED MUD PNEPERTES LOW SOLIDS NON-DISPERSED FLUID!NONEVENTS' Manufacturer 1 Ellis Williams Manufacturer TSM FL Temp("F) 1 Description r Today Model WH-1000-A Model TSM1000 Time 74.00 DEXTRID LT(sack) 0 Liner Size(in) I 5 Liner Size(in) 6 Weight(lbs/gal) 8.8 ALDACIDE G(5g pail) I g Stroke(in) 10 Sboke(in) 9 VIS(sec/qt) 28 KCI(sack) 24 BBL/STK @ 96% I 0.0583 BBL/STK @ 96% 0.0755 PV(cp) BARZAN D PLUS(2573) 0 SPM 0 i SPM 1 0 VP(lbs/100f) PAC-L(sack) 0• -- GPM 0 GPM t 0 Gds(Iba/lOMtz) Contiwe preparing for rig m N-ORIL HT PLUS(sack) 0 PSI 0 PSI 0 pH Clean pits and organize supplies 5-815(259) 0 WELL CONTROL Fitrate WL(mL/30 min) NXS LOSE(55g drum) 0 SPR Pump#1 N/3 -'SPR Pump#2 ' N/A Sand(%by vol) SALT-SOLAR(sack) 56 SPR Pump 81 WA S_PR Pump#2 I N/A Solids(%by vol) DESCO Chrome Free(258) 0 FIT EMW LCM(ppb) BARACARB 25(sack) 0 DRILL STRING AND HYDRAULICS CI(mg/L) 48,000 SOLIDS CONTROL EQUIPMENT AVDP(fps) 0 AVDC(fps) 0 Ca(mg/L) 160 Shelter • Screens Hours Annulus(bbls) N/A W OB(k-lb) I 0 Cake(API 32nd inch) Super G-35,35 35 3 24 Pipe(bbls) N/A RPM 0 PF/MF(mi) Super G-35,35,35 3 24 Pick Slack Off)k lb NIA dP System 0.3689 Total Circ(bbis) 52 Super G-140.140,140 3 24 P( ) TFAf __ ( j yatem(poi) 0 Hole(bbis) • 147 Centrifuge Speed Hours • Jet Val(fps) 0 dP @ BIt(psi) I 0 Reserve(bbls) 25 Pit 3 Centrifuge 2300 0 Current BHA Item Description I 013(In) I ID(In) I Gauge(In) Top Connection Length(h) Vendor Cumulative Length(ft) BRT hours • f TOTAL BHA LENGTH: 0.00 MOST RECENT DIRECTIONAL SURVEYS MD 1 INC I-__-qZ I TVD II cell$ .E/-W VS I• DLS � Gkuletlon � VS Azimuth 4571.10 85.94 253.05 Minimum-720.07 -3188.59 3264.73 ' 7.72 Mum Curvature 255.16 6031.89 85.32250.16 i 2351.49 -739.13 -3243.92 3325.02 4.86 Minimum Curvature 255.76 0.00 _... Projected b TD-.. 4708.00 85.32 � 250.16 2357 72 �784.95 -3315 46 3400.79 I 255.16 FUEL CONSUMPTION KUUKPIK Summary Quantities Vol(gal)RIG#5 MAO FUEL TYPE.RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED AO REPORT:I 34111.4-12CWaWeatkn_ .__.. I ---_.r Vol(gall Customer IVW(g_aa Customer vol(9a0 Customer vol l0.1)._- _-_ Delivered Today 0.0 BSS(D) Kuukpik(D) 227 0 5.000-gallon Tank(0) Total Diesel Consumed 331,033.3 On lal Gasoline On Hand Today 2,400.0 Delo Lassa(D) 308,4 Peak(D) 1448.9 23 OOOgalbn Tank(D) Consumed 15,954.0 Used Today 2,200 0 GBR(D) Tlkigaq/Conam(D) 73q,1 NSB Equipment(D) ; T: Diesel Consumed Today 7,1131.5 Used One Wap 42 i 548 0 Halliburton(Dj 6256.9 Umkq(D) 188.2 IBGF(G) I 341.5 Gasoline Consumed Today 341.5 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company Position Coe t 71 EelHre [Total HoursNoble Incident-l- _ - Type 1 Todmm ay I Comment. Kuukpk DHing Rig Crew 22 ' 12 264 I Illness 0 Kuuk lir Orillin Tool Pusher 2 12 24 In p 9 Injury 1 !See notes HES BSSC tin 9 13 117 Three in gcamp.Six Paying in Bartow Spill 0 HES Baroid Mud 1 1 13 I 13 1 Tunda Disturbance 0 HES-Sperry MWDrLWDIDD I Vehicle OS Road 1 See notes HES Supervisor 1 , 13 13 `HES supervisor WyngnBarrow Near Miss I 0 Conam _Facilities 20 12 240 IAN personnel sifting in Barrow -- --- --- - -- Umiaq Ops Support 7 13 i 91 Spill tech in camp.Al otters in Barrow Vehicle:An HES pickup truck went off ice road.No Injuries,no Vele*Grey Tech 1 12 12 tundra damage.Truck was hauled back onto ice road. Peek Rig Sspport 18 14 252 Five in camp.13 slaying ten Ba row Injury:A HES employ slipped and fell at EB-15.Visited camp medic Kuukpk Catnip Cookasen 5 12 60 and will return to work after resting at company apartment in Aleut) Camp Manager 1 12 12 Barrow. Beacon Medic 1 12 12 Baker Hughes Liner 1 15 15 Leeyirg 05-March AM flight - PRA Coned Super 1 12 12 Staying in Barrow PRA DSM 2 12 24 rell PRA HSE 1 12 12 OBR Casing 2 15 90 LeaNng OS March AM flight _ ESTIMATED TOTAL DAILY LABOR HOURS: 1203 Total Personnel in Camp:48 IndlvIduat. ..,..4. 7,,,,4,-,,,-, • WALAKPA#11 DAILY DRILLING REPORT 6-Mar-12 �5- + :, - ,,,r,- Operator NoNorthSlope Borough Project Description Gat illinon Dr g k d Well Site Leaden Don Breeden/Thor KaYmbd a- vel 5,,,,,�?y Well Nam. ---------wwkpa#11 cw Number ee-090 seer Phone (907)Seo-ezoe • ` ar.� API B I AOGCC 50-023-20038-00-00 Land Use Permit NSB Development Permit Office Phone (907)771-1002 (PTD N) Rip Accept 13 Feb 2400 Rig Contractor Kuukpik Drilling,LLC:Kwkpik Drilling RM 95 Property DesIgnaion WaWrpa Well 819.Phone (907)771-1021 Dab/Time I his Rip R4beee08:00 Depth TD @ 4,708 MD 2,357 ND Target Depth(feet)rkb 3,535 MD 2,343 ND HOE Phone (907)771-1025 (907)771-1025 Date/TimeI (f"4 rkb _- Days on Well SII 22 OART I RID Koekpik 55 Operations Neat 24- Continua RID Kuukpk ldr N5.Prepare for move to Wapa 13 Hours OPERATIONS SUMMARY _ 24-HOUR ACTIVITY SUMMARY CLMULATNEACH0ITY SUMMARY Start I Finish Hours � Description Detan ,Dew_; .,.Told hoses. ---- - - -- 8:00 8:30 2.5 R/D koomey flow line,bell nipple,choke and kit Ynas.Break 4 bolt stack.Remove 1.Rig Up/Rip Down 8.30 Ihydr8 and math and grease aDrYh9 _ 14975• 9:00 0.5 'Remove doublegate and _ --- grease 3.Reaming 0.50 __ 000 1030 1.5 Remove mud cross,single gate and choke line.Grosse 4.Comp 10.30 12:00 1.5 Coil up koomey lines and vibration hoses.Pick up tools 5.Condition and Ckoulate 39.50 _ 12'.00 17:00 50 N/D gas buster and choke manrfokl bleed off line.Clean cellar and clean pits 6.Trips 110.75 17.00 !P/U short tree.Hammer up same.Teat hanger.It leaked.Retighten bolts.Retest Good 7.Lubricate Rig •' 2.50 test this time.5.000 psi for 10.mnules.Remove companion flange and pull SPY from 8.Repair Rig 6.00 22.30 5.5 tubing hanger.Reinstall companion flange B.C/O Drill Line 2.50 22:30 2330 1.0 'R/U to freeze protect web /0.Dawtion 3.50 -__ - ----_ 23.30 Test Inesto 2.000 pd Perform LOT on&S/e'x 7"annulus.Fonnatlon Maks down needy 1 t.Wireline Log _ 0.00 OS and took fluida.EMW calculations to be provided this AM when rate/preewn data ompiled12.R Casing and Cement 44.00 0:00 1 30 1.5 Flush 9-5/8 7 annuluswith 75 bbls a water.Freeze protect with 42 bbl d eel '_ 13.Wait on Cement 1:30 Reveres circulate 21 bbls diesel thugh one arm of 7 x 2-7/6 annulus Take brine returns 14.Nipple up BOP 18.5 72.00 4.30 3.0 from tubing into pits.Send truck to EB-15 for more diesel 15.Test BOP 24.50 430 5'.00 0.5 Swap to other 7"x 2-7/8"arm.Reverse circulate 52 more bbls diesel into annulus 16.Drib Stem Test 5:00 I 8',00 1.0 Remove companion flange.Install BPV.Prepare to bullhead 15.6 blots diesel down tubing 17.Plugback 18 Squeeze Cement "'EB-15 Update"` 19 Fishing ____. -_-Approximate volumes on hand.343 bbls water,143 bbls diesel,2,932 bbla waste fluid 20 Directional Work 11.50 "'Current Weather"' 21.Other 7.5 39.00 TOTAL HOURS: 24 Temperature:-25 F to-40 F.Winds variable-5 MPH TOTAL HOURS: 24 508 DRILLING AND COMPLETION INFORMATION BIT NUMBER ! SIZE(in) I MFG TYPE 1 SERIAL NUMBER JETS I DEPTH IN(ft) DEPTH OUT(It)I FEET GRADE OUT I HRS 080 FT/HR 1 121/4 HDBS 0,11/0oth 11748526 3x16-1x12 48 1208 1160 i vel E-t-NO-TP. 28.34 40.93_ 2 B 192 HDBS FX 2526 PDC 5013668 5913 1208 3426 2218 5 x No-TD 20 23 r 109.84 3 61/8 1 HDBS-0HIR I Mllltcoth 11562867 3x13 3426 i 4275 849 01 L -1-NH 4545 1868___ 4 61/8 HDBS-OHIR MAltooth 11484396 3x13 4275 I 4708 433 LATAE -NO-ro 1072 I 4039 ' CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RKB CEMENT PROGRAM Section 00(in) Weight(ppf) ;_ Grade I- Thread MD(ft) ND On Contractor 1 GIP Type Comments ants Conductor 16 84 L-80 _Welded 101.5 101.5 Halliburton 26-Dec-11 @ 03:30 'C'Permafrost TOC at 15 U-tubed Surface Casing • 95/8 IO_ 1.80 1 BTC-M 1.193 1,135 Nalliburlon 18-Feb-12 06:45 L&C ) Returns to Surface Int Casing 7 1 28 L-80 BTC-M 3.415 2.258 Halliburton 24-Feb-12(g 08:00 G Plug bumped Slotted Liner 41/2 12.6 L-80 BTC 4.701 2,357 Baker Hughes Top of SLZXP Packer/4.5'Liner @ 3,23T MD No Cement Comp Tubing 2 7/8 6.5 L-80 • EUE 3.137 2,174 Tailpipe assembly terminates with 6.5# }three entry guide No Cement PUMP 61 PUMP 82 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer Ellis Williams Manufacturer TSM FL Temp('F) Description Today Model WH-1000-A Model TSM7000 line DE%TRID LT(sack) Liner Size(in) 5 Liner Size(1 � 6 W'ghl tad __-.. Suck out bone diWced Burin ALDACIDE G(5g I Stroke(h) 10 Stroke(n) 9 VIS(sac/gl freeze protection KCI(sack) BBL/STK @ 96% 0 0583 BBL/STK 0.913% 00755 PV(cp) BARZAN D PLUS(25#) SPM I 0 SPM 0 YP(lbs/109e) Clean pits and organize supplies PAC-L(sack) GPM _.... 0 GPM 0 Gels(bdlooe) N-DRL HT PLUS(sack) PSI 0 PSI 0 pH Conlinue preparing for rig move N-VIS(250) WELL CONTROL Filtrate WL(mL/30 mfr) NXS LUBE(55g drum) SPR Pump#1 N/A SPR Pump#2 N/A Sand(%by vol SALT-SOLAR(each) SPR Pump 81 N/A SPR Pum #2 N/A Solids /°by , P (° vol __ DESCO Chrome Free(256) _���-I_ FIT EMW(PIM) 13 LCM(ppb) ----- BARACARB 25(aack CONTROL EQUIPMELT DRILL STRING AND HYDRAULICS Cl(mg/L) i AVDP(fps) ' o AVDC(fps) 0 Ca(mgt.) --- Shaker ,. Screens Hou Annulus(bbls) N/A WOB(k-Ib) 0 Cake(API 32nd inch) Super G-35,35,35 3 0 Pipe(bbls) N/A RPM 0 PF/MF(m1) -_-- Super G-35,35,35 3 0 Pick Up(k-Ib) 0.0 TFA 6801 0 Total Circ(6193) Super G-140,140,140 3 0 Slack Off(k-Ib) 0.0 dP System(par) 0 Hole(bbls) Centrifuge Speed Hours Jet Val(fps) 0 dP @ Bit(pc) 0 Reserve(bbls) Pit 3 Centrifuge 2300 0 Current BHA ._.._-- ... _.. ) _--- -_ _ Item I Description OD(in)__ W fee) Omer9e Oe(in)I. Top Connection Length Of) Vendor cum9btlw Length(k) BRT hours I • • i I TOTAL BHA LENGTH: 0.00 • MOST RECENT DIRECTIONAL SURVEYS MO SIC AZ TVD ON/-S .E/-W � VS _I OLS I Calculation 1_VS Azimuth _ 4571.10 85.94 253.05 2346.87 -720.07 -3186 59 326473 j 1.72 Minimum Curvatura255.16 463109 85.32 - ---- 4708.00 85.32 -- - 250.18 2351.49 -73913 -3243 92 3325.02 4.86 MinimumCurvaturel ature 255.18 250.16 2357.72 -764 95 -3315 46 3400.79 0.00 Projected to TD t 255.16 FUEL CONSUMPTION KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED UMIAQ REPORT: 5-Mar-12 Clwwwtien Vol(gag Customer F vol(gal I Customer Vol Iwo customer Vol Iwo Summary Quantities Vol(gal) DeliveredOn Today 2.500.0 BSS(D) Kuukpik(D) 2784.9 5,000-gallon Tank(G) Total Diesel Consumed 339.655 8 H _ _..__ On Hand Today2.9000 Delta Lease D 215.3 Peak D _ () ( ) 1671.8 23000-gallon Tank(D) Total Gasolene Consumed 16.352 0 Used Today 2000.0 GBR(0) 12 0 Tikigaq/Conam(D) _ 223.0 NSB Equipment(D) Diesel Consumed Today ' 5,220.4 Used this Wet 44,548.0 Halliburton(0) 799 !Umiaq(D) 233.7 BGF(G) Gasoline Consumed Today 0.0 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HOE SUMMARY Company Position _Count 1. 6t Hours rTobl Houni Hobe Incident Type Today Cornute Kuukpik D IlIing Rg Crew 22 12 264 Illness1 See notesKuukpikD filling T of Pusher 2 12 24 Injury 0 HES-BSS 'Cemenlhp 9 13 117 ,Three ill camp,Six sla Hnq In Barrow Spit 0 HES-Baroid Mud 1 13 13 Tunda Disturbance 0 HES-Sperry MWDLWD/DD Vehicle Off Road 0 HES SuperNeor 1 _ 13 13 HES supervisor slaying in Barrow Near Miers 0 Conam _ Facilities 20 12 240 Al personnel slaying in Barrow --- ----- ---- Umlaq Ope Support 7 _ 13 91 Spill tech in camp.AM others In Barrow Vetco Gray Wellhead 1 12 12 Illness:A Kuukpik rig hand went home early from his shift due to Peak Rig Support 18 14 252 Five in camp 13 staying in Barrow illness.A camp bug seems to be making the rounds again. Kuukpik Catering Cook/Clean 5 12 80 Alutip Camp Manager 1 12 12 - -_ Beacon Medic1 12 12 Baker Hughes Liner - - PRA Genet Super 1 12 12 Staying in Bartow -- --- --__-_-- rilil PRA DSM 2 12 24 PRA HSE 1 12 12 GAR Casing___ ESTIMATED TOTAL DAILY LABOR HOURS: 1108 Total Personnel In Camp:40 Individuals _ _ �, WALAKPA#11 DAILY DRILLING REPORT 7-Mar-12 / ,..„4,;;m'''''1.,,,''':::,:. .,( }, ^.• Barrow Ge. dl Operator North Slope Borough ProjectDescriptionWall Site Leaders Don Breeden/Thor Kalleetad Orating t Well Name Walakpa#11 CIP Number 88-090 Cell Phone (907)D80-4208 ,..1110, 50-023.20038-0000 Land Use Permit NSB Development Panni Office Phone (907)771-1002 API#/AOOCC _ (PTD#) Rig Accept 13-Feb a 23:59 Rig Cadractor Kuukpk Drilling,LLC:Kuukpk Dring Rig#5 Property Dpignallon Walakpa Wall Site Phone (907)771-1021 Dalvalme J. On Drill Rab Rig Reklpa09-Mar 23:59 08:00 Depth _- TD a 4,708 MD 2.357 TVD Target Depth(Mt)rkb 5,335 MD 2,943 TVD HSE Phone (907)771.1025 Date/Time I On Move Rate (bet)rkb Days on Well OART R/D and move Kuukpk#5 I OpaalHou oun Next 24- Continue R/D Kuukpk#5.Continue moving to Walakpa 13 OPERATIONS SUMMARY _ 24-HOUR ACTIVITY SUMMARY CUMULATIVE ACTIVITY SUMMARY Start 1 r Finish Noun � Description Detail i DailyDailyi To41...... .__ - _- 500 7:30 1.5 :Ins1aN companion flange.Bullhead 158 biota diesel down 2-7/8'tubing 1.Rig Up/Rig Down 180 18.0 7:30 ,Wail on Valco back pressure valvas to arrive.Suck off remaining fluid from pits and 2.Drilling 140.75 12:00 ) 4.5 tperform genial R/D activities in the mean lime 3.Reaming 0.50 12:00 18:00 8.0 Prep rig floor to scope down mast and remove torque tube while waiting on BPVs 4.Coring 1.8:00 Break companion flanges on 7"a 2-7/8 annulus aweaps.R/U lubricator.Install BPVs in 5.Condition and Circulate 38.50 -- - 0:00 8.0 weeps.Install companion s flanges,close all tree valves and L/D lubricator 6.Trips 110.75 7.Lubricate Rig 2.50 0.00 _ 0:00 Rig went from drill rob to mow rate.22 days tool on drill rata for Walakpa 11 8 Repair Rig 8.00 - - - 9.C/O Gilt Line 2.50 0:00 ----8:00 8.0 I R/D cam chute.Remove Cogs heater from cellar.Scope down mast ---10.Deviation 9.50 __. 11.Wireline Log 12.Run Casing end Cement 44.00 13.Wan on Cement 14.Nippleup BOP 72.00-- --------- - --- --- 15 Test OOP 24 50 ... 18.DnN Stem Test _-. EB-15 Update"' Approximate volumes on hand:343 bbls water,70 Ws diesel.3.272 bole waste fluid 17.Plugback _- 18.Squeeze Cement "'Current Weather m 19.Fshng Temperature:-25 F to-40 F.Winds variable-5 MPH 20.Directional Work 11.50 21.Other 8.0 I 45.00 TOTAL HOURS: 24 TOTAL HOURS: 24 530 DRILLING AND COMPLETION INFORMATION -_BIT NUMBER ! SIZE(in) I MFG TYPE SERIAL NUMBER JETS DEPTH IN(ft) DEPTH OUT(ft)I FEET GRADE OUT HRS OBD 1 FT/HR 1 121/4 HDBS Milltown 11748526 3016-1012 48 1208 1160 l -1 28.34 40.93 _ 2 81/2 HDBS F%2526 PDC 5013668 5x13 1208 3426 2218 tC 20.23 109.64__ 3 61;8 HOBS-OH1O MNtwln 11562667 303 3426 _ 4275 849 1-CT- 4545 18.68 4 81/8 HOBS-0111R 1,8il110011 11484396 303 4275 4708 43322rv020 10.72 40.39 CASING AND COMPLETION PROGRAM-ALL SET DEPTHS MEASURED FROM RKB CEMENT PROGRAM Section OD(in) .. Weight(ppf) Grade I Thread MD(h) TVD(ft) Contractor I CIP I Comments Coments Conductor 16 84 L-80 • Welded 101.5 101.5 Nalliburlon 26-Doc-11x03.30 "C"Permafrost TOC at-15'-U•Wbed Surface Casing ' 9 5/8 40 L-80 BTC-M 1.193 1,135 Halliburton 18-Feb-12 x 06:45 L 8 C Returns to Surface Int C_g 7 28 i L-80 BIC-IN ! 3,415 2,250 Halliburton 24-Fab-12x0800 G Plug bumped Slotted Liner 4 1/2 12.6 1 L-80 I BTC T 4,701 2,357 Baker Hughes Top of SLZXP Packer/4.5'Liner a 3,23T MD No Cement Comp Tubing 2718 6.5 L-80 � EUE 3,122 2,108 Tailpipe assembly terminates w/B.5#wireline entry guides 3122'MD No Cement PUMP 81 PUMP#2 LOW SOLIDS NON-DISPERSED MUD PROPERTIES LOW SOLIDS NON-DISPERSED FLUID INGREDIENTS Manufacturer EIAs Will ms Manufacturer TOM FL Temp(°F) Dpeription Today Model WH-1000.A :Modal TSM1000 Time DEXTRID LT(sack) 0 Liner Size(in) 5 Liner Size(to) 6 Weight(lbs/gal) ALDACIDE G(5g pail) o Stroke(in) I 10 Stroke(in) g VIS(sec/qt) I KCI(sack) 0 BBL/STK,96% 0.0583 BBL/STK a 96% 0.0755 PV(cp) BARZAN D PLUS(258) 0 SPM 0 SPM 0 VP)lbs/100ft2 _ -PAC-L(sack) 0 GPM 0 GPM 0 Gels(lbs/100f1v) N-GRIL HT PLUS(sack) 0 PSI _-- 0 PSI 0 pH N-VIS(25#) 0 __. W�)FSL Filtrate WL(mL/30 min) NXS LUBE(S5g drum) 0 SPR Pump#1 N/A SPR Pump#2 N/A Sand(%by vol) SALT-SOLAR(sack) 0 --r.- ..__, SPR Pumpp#1 N/A SPR Pump#2 NIA Solitls(%by vol) DESCO Chrome Free(25N) 0 FIT EMW(ppg) t LCM(ppb) __ BARACARB 25(sack) 0 DRILL STRING AND HYDRAULICS CI(mg/L) _ - SOLIDS CONTROL EQUIPMENT AVDP(fps) 0 AVDC(fps) 0 Ca(mg/L) Shaker Screens Hours Annulus(bbls) NW .WOB(k-lb) 0 Cake(API 32nd inch) Super G-35,35 35 0 Pipe(bbls) N/A RPM 0 PF/MF(ml) Super G-35.35.35 3 0 _- Pick Up(k-Ib) 0.0 _ TFA find 0 Total Ciro(bbls) Super G-140,140.140 3 0 Slack Off(k-Ib) 0.0 IdP System(psi) 0 Hole(bbls) ' Centrifuge Speed Hours Jet Vel(fps) 0 IdP x Bit(psi) 0 Reserve(bbls) , Rt 3 Centrifuge 2300 0 Current BHA Item I Description 1 OD(b)_ : ID(In) Gauge(In) Top Connection Length(N) Vendor Cumulative Length(h) BRT hours - - - - i TOTAL BHA LENGTH:1..- 0.00 MOST RECENT DIRECTIONAL SURVEYS MD INC AZ I TVD aNIS _ oEI-W VS DLS Calculation VS Azimuth 4571.10 85 94 353.05 1 2346.87 Ij 720.07 -3186 59 _ 3264.73 I 132 M um Curvature 255.18 4631.89 85 32 250.18 I 2351.49 I 799_13 -3243 92 3325.02-.- - 4.86 M um Curvature 255.18 4708.00 85 32 250 16 2357.72 rr-784.95 - -3315 46 3400.79 0.00 P ojected to TD 255.16 FUEL CONSUMPTION KUUKPIK RIG#5 DIESEL FUEL TYPE,RECIPIENT,QUANTITY,AND DAILY DELIVERY SUMMARY DATE OF REFERENCED LMIAO REPORT: i-Mer-12 Classification 1 Vol(gal) Customer Vol(gal) : Customer : Vol(gal) Customer l Vol(gaff Summary Quantities Vol(gel) Delivered Today BSS(D) 0uu01 k(D) 399.2 5.000-gallon Tank(G) Total Diesel Consumed 343,410.3 y () T nam DEquipment T( )( ) Total Gasoline Consumed 16,867.6 On Hand Today ' Della Les D 255.2 Peak(D) 1384.0 23,000 Ito Tank D _ Used Today GBR(D) Iklgaq/C ( ) 992.5 NSB E 1 D Dieser Consumed Today 3,754.5 Used this Well Halliburton(0) 849 4 Umbq(D) 74.2 BGF(G) 515.8 Gasoline Consumed Today i 515.6 PERSONNEL AND HSE PROJECT PERSONNEL SUMMARY PROJECT HSE SUMMARY Company Position Count , Eat Hours Total HoursT Nobs Incident Type Today comments Drilling R'g C 22 12 264 Illness 0 Kuukp k Drilling Tool Pusher2 12 24 -_-- - --Injury 0 -- -- _ -_-_- o HES-BSS Cementing 8 _ 13 104 IThree in p Five stays g Bartow Spill 0 HES Baroid Mud 1 F 13 13 Leaving 07-March Tunda Disturbance 0 HES-Sperry MWD/LWD/DD ' Vehicle Off Road 0 1 HES Supervisor 1 13 13 HES euperWsor slaying in Barrow Near Miss 0 Conan Facilities -~ 10 _ 12 120 Al personnel stayeng in Barlow _ Umieq Ops Support 8 +-13 104 Spi tech in camp.AN n others Barlow Vetco Gray Wellhead 12 I- 12 Peak :Rig Support 18 14 252 Eight in camp Ten staying in Barrow _ Kuukpik Catering I Cook/Clean5 12 60 Alutiiq Camp Manager1 12 12 Beacon 'Medic 1 ,-__ 12 12--- -- --- - -- Baker Hughes Liner - --- --- - ----__ - _ PRA Const Super 1 12 _ 12 Sbytng in Barrow PRA DSM 2 12 _24 Ch geo tday07March - PRA HOE 1 12 12 Chgeotday06March GBR Casing ESTIMATED TOTAL DAILY LABOR HOURS: 1038 I-Total Personnel In Camp:4/Individuals �""" JOB DATE HALLIBURTON 02/23/12 OPERATOR DESCRIPTION CUSTOMER REPRESENTATIVE North Slope Borough Job Log Thor Kallestad I PRA DSM OPERATOR REPRESENTATIVE PROJECT CEMENTING CONTRACTOR PRA Barrow Gasfield Glen Fisher/HES Cementer WELL NAME RIG S WELL SECTION Walakpa 11 Kuukpik Rig 5 Intermediate Casing • Time Volume Rate(BPM) Press(PSI) Job Description/Remarks (BBLS) (AVG) (MAX) (AVG) (MAX) 15 Arrive location 30 Pre rig up safety meeting 100 rig up equipment 400 Pre job safety meeting 428 10.0 3.00 3.0 195 200 Pump water ahead 433 3500 Pressure test pumps and lines 450 40.0 4.50 4.5 350 350 Pump dual spacer at 13.5ppg 504 Drop bottom plug 511 19.2 3.60 3.6 141 150 Pump 90 sks of"G" at 15.8ppg,1.2cf/sk,5.09gal/sk stop drop top plug 523 20.0 3.80 3.8 71 80 displace 20 bbls water 525 turn over to rig 530 107.2 6.00 6.0 250 430 rig displaced 107.7bbls 605 127.2 2.00 2.0 500 1000 land plug bleed off pressure check floats,floats held Thor Kallestad/PRA DSM Glen Fisher/HES Cementer 0 ,..c ittO obsods• �4+yy0><'E$oG� res f 4`y,+•W+0 YB JOB DATE HALLIBU RT ON 02/18/12 OPERATOR DESCRIPTION CUSTOMER REPRESENTATIVE North Slope Borough Job Log Thor Kallestad / PRA DSM OPERATOR REPRESENTATIVE PROJECT CEMENTING CONTRACTOR PRA Barrow Gasfield Glen Fisher/ HES Cementer WELL NAME RIG# 'WELL SECTION Walakpa 11 Kuukpik Rig 5 Surface Casing Time Volume Rate(BPM) Press(PSI) Job Description/Remarks (BBLS) (AVG) (MAX) (AVG) (MAX) 200 Safety meeting 230 Spot equipment 300 Rig up equipment 417 Pre job safety meeting 454 10.00 2.00 2.0 30 30 pump 10 bbls of fresh water 459 0.50 0.5 3500 Pressure test pumps and lines 503 40.00 2.00 2.0 40 40 Mix and pump 40 bbls of Dual spacer Drop bottom plug 521 65.20 4.50 4.5 35 45 Mix and pump 85 sks of Type L 4.31 cf/sk,21.24 gal/sk 557 48.20 3.00 4.5 35 145 Mix and pump 285 sks of Type C,0.95cf/sk,3.68gal/sk Stop drop top plug 623 10.00 2.50 2.5 40 140 pump 10 bbls of fresh water displacement 626 Turn over to rig Rig landed plug at 400psi then brought up to 1400psi Checked floats,floats held 50 bbls returns to surface Thor Kallestad/PRA DSM Glen Fisher/ HES Cementer Mill. 41"'ierc-;:AC'LL--_, I , apliv2M: McMains, Stephen E (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, June 12, 2012 11:17 AM To: McMains, Stephen E (DOA) Subject: FW: Initial Rates for Redcently Completed Savik and Walakpa Wells (j) 8 If you have time you could enter these into the data base. r ` 0 W Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Pete Stokes [mailto:stokes@gci.net] Sent: Tuesday, June 12, 2012 9:18 AM To: Schwartz, Guy L (DOA) Cc: Tom Walsh; Michael Cook; William Van Dyke; Polkoski, David; Russell, Justin; Barbara McMullen; Joe Ramirez; Jack.Laasch@ north-slope.orq Subject: Initial Rates for Redcently Completed Savik and Walakpa Wells Guy, Per our phone conversation, below are the initial shut in and flowing rates/pressures for the recent wells drilled and completed in Barrow. Savik#1 Shut In Pressure at Surface: 838 psi Initial Rate: 0.78 MMSCF/D with tubing pressure of 788 psi. Savik#2: No initial pressures or rates due to suspected hydrate plug. Plan to clean out with coil tubing in July or August. Walakpa #11 Shut In Pressure at Surface: 916 psi Initial Rate: 0.84 MMSCF/D with tubing pressure of 914 psi. Walakpa #12 Shut In Pressure at Surface: 916 psi Initial Rate: 1.19 MMSCF/D with tubing pressure of 914 psi. Walakpa #13 Shut In Pressure at Surface: 925 psi Initial Rate: 1.14 MMSCF/D with flowing pressure of 923 psi. As the demand for gas in Barrow is very low at this time of the year, we would like to postpone 4 point tests until next winter to prevent having to flare and thus wasting of the gas. Additionally, at that time the new SCADA system will be fully functional and allow for easier control of the wells for these tests. Until the SCADA system is fully operational, the wells have to be tested manually, which involves tundra travel by Rolligon during the summer season. Peter J.Stokes, PE&MBA Please confirm that we can postpone these tests. Cell Phone: (907)223-6220 Pete RSDMS JUN 1 2 20 !„� � Petrotechnical Resources of Alaska 'J 3601 C Street Suite 822 Anchorage,AK 99503 Phone: (907)272-1232 Fax:(907)272-1344 3601 C Street Suite 1424 Anchorage, AK 99503 907-272-1232 (voice) 907-272-1344 (fax) info@petroak.corn April 14, 2012 Mr. Howard Okland Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Okland, Please find enclosed the well log (black lines and on disc), definitive survey, and EOWR from Walakpa #11 (API #50-023-20038-00) and the EOWR for Walakpa #12 (API #50-023-20040-00) development gas wells. This submittal fulfills the geologic data requirement per 20 AAC 25.071. It is requested that this data submittal be held confidential. Walakpa #11 data (1 copy each): DGR/EWR/ALD/CTN composite logs (120 ft—2303 ft tvdss) tV ROP/DGR/EWR composite logs(170 ft—4708 ft MD)/ CD disc(graphic presentation of tvdss and MD logs and definitive survey) 411 A1, 3 EOWR—End of Well Report by Halliburton ,� j j 3 Walakpa#12 data (1 copy each): EOWR—End of Well Report by Halliburton Since :ly, ,� Of( / i Barbara McMullen Senior Development and Operations Geologist, PRA f Received by: G,LJ on jI 'rY` Rti— o6F SLISAINE IF ALASKA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Michael Cook Engineer North Slope Borough 1689 Okpik Street Barrow, AK 99723 Re: Walakpa Field, Walakpa Gas Pool, Walakpa #11 North Slope Borough Permit No: 211-068 Surface Location: 2555' FNL, 1654' FWL, UM, SEC. 21, T2ON, R19W Bottomhole Location: 1820' FSL, 2236' FEL, UM, SEC. 20, T2ON, R19W Dear Mr. Cook: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i Daniel T. Seamount, Jr. Chair DATED this I/day of June, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) RECEIVED AL .A OIL AND GAS CONSERVATION COMI ;ION nv, PERMIT TO DRILL 20 AAC 25.005 ' . . . .-i ,r: :i ion 1 a.Type of Work: 1 b.Current Well Class: Exploratory 0 Development Oil o lc.Specify if well is pr...s=. or: Drill 9 Radii!! 0 Stratigraphic Test 0 Service 0 Development Gas 9 Coalbed Methane 0 Cas +.Q.., ' ,., Re-entry 0 Multiple Zone 0 Single Zone 0 Shale Gas 0 2.Operator Name: 5. Bond: Blanket 9 Single Well D 11.Well Name and Number: North Slope Borough-Barrow,Alaska Bond No. CD 17430' Walakpa#11 3.Address: 6.Proposed Depth: 12.Field/Pool(s): Dept.Public Works, 1689 Okpik St.,Barrow,AK 99723 MD: 5355 ft. TVD: 2343 ft. WALAKPA 4a. Location of Well(Governmental Section): 7.Property Designation: Surface: 2555'FNL, 1654'FWL,UM Section 21,T 20 N,R 19 W WALAKPA Top of Productive Horizon: 8.Land Use Permit: NSB Development 13.Approximate Spud Date: 2198'FSL, 766'FEL,UM Section 20,T 20 N,R 19 W UIC Private Land Permit No.10-252 20-Jan-12 Total Depth: 9.Acres in Property: 14.Distance to Nearest 1820'FSL,2236'FEL,UM Section 20,T 20 N,R 19 W 21,120 Property: 15,835 ft. 4b.Location of Well(State Base Plane Coordinates): 10.KB Elevation 15.Distance to Nearest Well Surface: x- 631553 ' y- 6243159 Zone- 6(NAD 27) (Height above GL): 21.5 feet Within Pool: 14 ft.-Walakpa#12 16.Deviated wells: Kickoff depth: 250 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 89 degrees Downhole: 1008 psig Surface: 780 psig '7 18.Casing Program: Specifications Top(rkb) - Setting Depth - Bottom(rkb) Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 26 16" 84# L80 Weld 80 21 21 101 101 Single Stage:265 sxs. 12 1/4" 9 5/8" 40# L80 BTC-M 1152 20 20 1172 1153 Lead:126 sxs,Tail:450 sxs 8 1/2" 7" 26# L80 BTC-M 3788 19 19 3807 2288 Single Stage:43 sxs. 6 1/8" 4 1/2" 12.6# L80 BTC 1698 3657 2255 5355 2343 production-slotted liner 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20. Attachments: Filing Fee 9 BOP Sketch 9 Drilling Program 9 Time v.Depth Plot 9 Shallow Hazard Analysis 9 Property Plat 9 Diverter Sketch 9 Seabed Report 9 Drilling Fluid Program 9 20 AAC 25.050 requirements 9 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the f.regoing is true and correct. Contact Printed N e _Agri , .. �� Title _A.f ,�# • � I Signature (,(AA, '/ Phone (,0,�9 444,4!622 Date I 1 t 2.12311 Commission Use Only 111 Permit t Drill ) API umber: Permit Approv I See cover letter for other Number ,`J ( (1 7 ) 50-02.,3-L6,62)___ r-t) "C ate: CD � ��\‘ requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shale Other: ,it 35-56 p S•� go 1 .,f _ Samples req'd: YesO No Q" Mud log req'd: Yeo N43' �� H2 /measures: YesO No[1 Directional svy req'd: Y[' IQ tt-ZSoo p. L 4„., 4L44 ,..•�.. APPROVED BY THE COMMISSION 07/ ✓ / DATE. 4 ,COMMISSIONER i G, /: i / ORIGINAL ,® 64 Form 10-401 Revised 12/2005 �'`ie OY/ Submit in Duplicate PIA 3601 C Street Suite 1424 Anchorage, AK 99503 907-272-1232(voice) 907-272-1344(fax) info@petroak.corn pact u/ersawksAL.444 Memorandum RECEIVED STATE OF ALASKA OIL & GAS CONSERVATION COMMISSION MAY 6 2011 333 W. 7`h Ave. Suite 100 Anchorage, AK 99501 glake Gil&f18$Com Coraission Aflcf 2r To: Guy Schwartz— Petroleum Engineer CC: Joe Ramirez— Project Administrator/ Barrow Gas Fields Well Drilling Program From: Mike Cook — PetroTechnical Resources Alaska Date: 5/15/2011 Re: Permit to Drill : Savik#1 & Walakpa#11, Annular Injection : EB#21 Dear Sir, Petrotechnical Resources Alaska (PRA), providing well design engineering support for the North Slope Borough's - Barrow Gas Fields Well Drilling Program submits for your review : • Permit to Drill (Form 10-401), Well : Savik #1 • Permit to Drill (Form 10-401), Well : Walakpa#11 • Annular Disposal Application (Form 10-403AD) , Well : EB#21 The Savik #1 and the Walakpa #11 Permit to Drill applications provide well construction design information for both the East Pool and Walakpa gas fields, where in total, six horizontal gas development wells will be drilled and completed beginning in September 2011. The EB#21 Annular Disposal Application submittal, requests the utility of the wells surface x production casing annuli for the disposal of drilling wastes per 20 AAC 25.080 section (h) parts 1-3. Mike Cook Petrotechnical Resources Alaska Office : (907) 677-5103 Email : mcookgpetroak.com DATE: 4-26-11 SCALE: 1" = 1071 SHEET: 1 OF 1 "• Aam_ 1.• R—^ DATE DESCRIPTION Awiiw���r.►dyl. - PROPOSED :C rrifilapti�. SWELLS 11 1 11-12-10 WELL COORDINATES SIGNIFICANT FIGURES 2 4-22-11 WELL COORDINATES DGPS a i�7�AAV t • N 41iCii' +.aC :. . NOTES: %i14W ids 1���/i■Iii i7 ,��o�I I;■._� 1. COORDINATES SHOWN HEREON BASED UPON DIFFERENTIALLY ©fir Tilla ::11.1111.14iarsilleig14•r �iiiL1 \►CORRECTED GPS OBSERVATIONS. .�„��r%17 uli LimomCC' �CC 2. AS-STAKED SURVEY CONDUCTED AUG.30,2010&APR.22,2011. ■i�i�L1� �� �� ' \ lig .mw _. �u �, I IIIc , is Ntijll�c:•3. ALL DISTANCES ARE IN U.S.SURVEY FEET. ��I 117I a�IL IN NN- 4. PROTRACTED SECTION LINES SHOWN HEREON ARE IF ,�r tai w i a 1 '�l SOL■N■--SI APPROXIMATE AND FOR REFERENCE ONLY. VICINITY MAP-NOT TO SCALE AS-STAKED "WALAKPA LEGEND PROPOSED"WALAKPA 11" 11 /12" DRILL PAD A PROPOSED WELL LOCATEWELL D WITHIN 0 RP TO WELL T.20 N.,R. 19 W.,U.M., SECTION 21 T 20 N, R 19 W, UM SECTION 16 T 20 N, R 19 W, UM SECTION 21 NAD 27,ZONE 6 aN O O LAT:71°04'20.1984"N WAL-12 RP2 WAL-11 RP2 LONG:156°53'33.9725"W 4 �,,~F WELL RP DISTANCE TABLE N=6,243,159.55 WAL-11 WAL-12 E=631,552.72 ib — O RP1 244.16' 243.55' NAD 83,ZONE 6' Na iv--- sm RP1RP2 353.96' 353.38' LAT:71'04'18.6608"N LONG:156°53'46.3556"W 4411 S 89'20' T N=6,242,847.06 T E=1,771,557.78 *N N 0 50 100 N PROPOSED"WALAKPA ::�..... 12"WELL SCALE IN FEET LOCATED WITHIN T.20 N.,R. 19 W.,U.M., SECTION 21 PROPOSED NAD 27,ZONE 6 PAD //- LAT:71"04'20.2097"N 7.0 —�- LONG:156"53'33.5490"W 7.0' N=6 1,5 160.96 6.68 1661±'--A, E=631,566.68 `" N NAD 83,ZONE 6* Z PROPOSED I PROPOSED "WALAKPA 12" LONGI166°6345?9321^w Lu m "WALAKPA 11" WELL N=6,242,848.47 _ t� m = WELL �� E=1,771,571.74 EN '} c CD I m rn C7 0) LI, 'CONVERTED BY NAD CON o D: Ni rn V _ z I– I– -ark" OF Atgs<< rr1 N 89'20 W 340" ��'•• .'1 ,r Co: TH v 11r / *. 49 .* SURVEYORS CERTIFICATE i n ,I,_ :2 I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE ''lijj..-:=12) 4-z1-I 1 e v STATE OF ALASKA AND THAT THIS AS-STAKED EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY m DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF APRIL 22,2011. / KEN NETH J.PINARD N oi ��� No• . 11545 t• lima PETROTECHNICAL t ..... ;tl, 10122R. ,Il1FdpRofESSIO• •Na��p-•�'��URESOURCES „bE�.,=A.M.SVIII 200 \\����`�� oALAS an Ukpeagvlk Inuplat Corporation Company 0 DRAWN BY:LHH I CHECKED BY: KJP I W.O. No: 2009-214-A Rig Floor } I 21"1 Bottom of Rotary Table 1 8„ /, 14" ttom of Rotary Beams 1 49" Nipple / 1 49" 11"Annular 175", +I III v ic. " 11"Double Gate oo r- 1 1 U) nnn L J nnn CV 23" 11"Mud Cross t r 1 LJ 20" 11"Single Gate 6" -11"5,000 Flange , 36"Sub Base Skid 11"5 M 6'long Spacer Spool Sub Skid Level 24"Skid Base 6"Rig Mat I %3;"ss;%c>'/. Ground/Pad Level \ I V ' \� �\ 11"5 M Top of 11"5M flange @ Ground Level N 4 9 5/8"Casing 9'OD Cellar 6'Deep 11"BOP Stack Kuukpik Drilling Rig 5 Choke Manifold Valves 2 To Shaker 3" Panic To Gasbuster 2 1/16' 2 1/16" K )1 - ]( ' t A 21/16 2 1/16" co N I . 1 3 1/8" i I N M 1 2 1/16" 2 1/16" Manual Choke Automatic Choke 2 1/16" Inlet Pressure Sensor 3" 3" 5,000 PSI Choke Manifold Kuukpik Drilling Rig 5 RED = 3 1/18" 5,000 PSI VALVES AND LINES BLUE = 2 1/16" 5,000 PSI VALVES Kuukpik Drilling Rig 5 Choke Manifold Drawn By: L Ross Date: 8/1/04 C-2 40 #9 _ #: 4 #16 #1 #2 vik #15 Kuukpik Or,lirg kig 5 Choke Manifold Rig Floor f 21"1 Bottom of Rotary Table 1 1 �— 12" 14" Korn of Rotary Beams $ / T 1 72" L 1 'a 50.5" 21 1/4"Annular 1 C11 11" Diverter opening center line Diverter Line Opening Diverter Spool 72" — 3" V 36"Sub Base Skid 1 r 1 92" 66" 24"skid base 7'long Spacer Spool 6"Rig Mat 25 Ground/Pad Level 1 21 1/4"Starting F#ange 9'OD Cellar 6'Deep KUUKPIK DRILLING RIG 5 21 1/4"Diverter System With 7'Spacer Spool 1 = iatg a'N.444�' �Nsu paenN ldy 2.p't Walakpa #11 Horizontal Development Well Walakpa Gas Field Barrow Gas Fields Well Drilling Program CIPM : 68-090 Rig : Kuukpik #5 AFE Number: AFE Amount: Days: 23 Estimated Spud: 20, September 2011 Prepared By: PRA Drilling Team Prepared by: Reviewed by: M.R. Cook M.D. Dunn NSB Project Administrator Date DOE Project Administrator Date Distribution: 19 Copies, 1 original Kuupik #5 8 copies Matt Dunn 1 copy Joe Ramirez 1 copy Jack Laasch 1 copy Tom Walsh 1 copy Mike Dunn 1 copy Mike Cook 1 copy Pete Stokes 1 copy 1 Contact List LOGISTICS CORE TEAM Name Company Title Responsibilities Office Phone Cell Phone Email Amber Babcock SolstenXP Logistics Manager Services from Delta,GBR,Kuukpik Catering 907-264-6113 907-602-0304 amber.babcock@solstenxp.com Barb VanderWende PRA HSE&Compliance Officer On-site compliance admin,HSE QC 406-599-2821 bvanderwende@petroak.com Ben Ball PRA Facility Engineer Facilities 907-272-1232 907-382-4039 bball@petroak.com Bill March AES Project Manager Logistics project management 907-339-6428 907-229-7527 bill.march@asrcenergy.com Bill Van Dyke PRA Petroleum Engineer Waste management,permitting 907-272-1232 907-982-2019 wvandyke@petroak.com Bob Leonard Northern Offshore Svcs Marine Consultant Marine ops planning 206-790-6604 leonardrf@gmail.com Bob Schutte PRA Facility Engineer Facilities 541-915-0158labschutte@aol.com Chris Garlasco PRA HSE&Compliance Officer On-site compliance admin,HSE QC 303-526-7450 chris@softprowest.com Christen VanTreeck Carlile Sr.Logistics Manager Transportation business mgmt 907-276-7797 907-632-2454 cvantreeck@carlile.biz Cynthia Schiller PRA Cost Controller Cost control,schedule 907-677-5114 907-350-9905 cschiller@petroak.com Dan Lowe NSB Drilling Consultant Project Sponsor,Drilling&Facilities 907-561-6605 970-389-7688 dan.lowe@north-slope.org Eric Wieman Peak Project Engineer Barrow transportation 907-263-7000 907-441-1301 ewieman@peakalaska.com Jack Laasch NSB Project Consultant Project Sponsor,Logistics 907-646-8279 907-646-8279jack.laasch@north-slope.org Jeremy Miller Carlile Operations Manager Transportation operations mgmt 907-276-7797 907-632-2427 jmiller@carlile.biz Kenny Overvold Kuukpik Drilling Superintendent Kuukpik Drilling Rig 907-279-6216 907-223-5044 kennv@kuukpik-drlg.com Mike Cook PRA Project Engineer Drilling,Completions,&P&As 907-677-5103 907-444-8822 mcook@petroak.com Mike Dunn PRA Project Engineer Logisitics 907-677-5102 907-351-4191 mdunn@petroak.com Mike Matteucci Umiaq Program Consultant Barrow support,diesel/waste management 907-677-5200 907-350-0781 mmatteucci@uicumiae.com Nancy Joseph PRA Technical Specialist Contracts/PSCM 907-272-1232 907-227-6865 njoseph@petroak.com Randy Hicks Kuukpik General Manager Kuukpik Drilling Rig 907-279-6241 907-317-4924 randv@kuukpik-drig.com RobertLewellen Lewellen Arctic Research Weather Consultant Weather Forecasting 907-745-3184 907-250-8591 seaiceman@gmail.com Robert Watkins Umiaq Response Planning Manager Diesel Supply Plan,Spill Response 907-677-8259 907-306-5221 robert.watkins@uicumiaq.com Robin Demoski AES Technical Administrator Logistics project support 907-339-7602 907-388-1280 robin.demoski@asrcenergv.com StuartJefferies Halliburton Project Manager Downhole services,drilling fluids,cementing 907-276-2627 ext 275 907-748-3905 stuart.lefferies@halliburton.com Tim Mathews Tikigaq Conam Project Manager Facilities 907-278-6600 907-317-3184 tmatthews@pricegregorv.com Tom Hendrix Carlile Business Manager Transportation management 907-276-7797 907-632-2436 thendrix@carlile.biz LOGISTICS EXTENDED TEAM Name Company Role Responsibilities Office Phone Cell Phone Email Phil Clingman Halliburton Engineer,Cementing Cementing,Bulk Plant RU 907-275-2630 907-947-5482 phillip.clingman@halliburton.com Mike Randall Halliburton Engineer,Mud Injection Mud Injection Facility 907-275-2606 michael.randall@halliburton.com John Harris TSA General Manager Tubulars 907-770-8703 907-830-7636 jharris@tsalaska.com Contract and Commercial Point Contacts Name Company Title Responsibilities Office Phone Cell Phone Email Patrick Walsh Peak VP Commercial,Contract 907-275-2630 907-947-5482 pwalsh@peakalaska.com Jeff Wilson Umiaq Division Manager Commercial,Contracts 907-677-8268 907-947-7866 jeff.wilson@uicumiap.com Mark Johnson GCI Mgr,Business Development Commercial,Contract 907-868-5478 907-306-1585 mark.Johnson@gci.com Randy Frazier SolstenXP COO Commercial,Contract 907-264-6115 907-250-4420 randy.frazier@solstenxp.com Eric Dompeling Baker Business Development eric.dompeling@bakerhughes.com Robert Stinson Tigiaq-Conam President Commercial,Contract 907-223-8759 bobstinson@conamco.com Randy Hicks Kuukpik General Manager Commercial,Contract 907-279-6241 907-317-4924 randv@kuukpik-drig.com 2 DATE: 4-26-1 1 SCALE: 1" = 100' SHEET: 1 OF 1 BARROW i■■ Edr `��,�,������� PROPOSED REV DATE DESCRIPTION r� _ _ ,,�� V7t' r�, 2 1 14-22-110 WELL COORDINATES WELL COORDINATES DGPSFICANT FIGURES /-I1�1All +RR' ll ��I �'�",egpWELLS NOTES: 1. COORDINATES SHOWN HEREON BASED UPON DIFFERENTIALLY 1111102101.1•11714,2figitittl-16 r■. j 7 V1� lIV J 'i4 CORRECTED GPS OBSERVATIONS. ' ••i! •1 �� n••• R�s�e ;. i ) Se:All%f� ■■, ■I 4111M,1111� A 2. AS-STAKED SURVEY CONDUCTED AUG.30,2010&APR.22,2011. ��� �1111 rIN■;Net . ,,,, ■■ 7 �n `L 3. ALL DISTANCES ARE IN U.S.SURVEY FEET. L Isi �1 iik 1 ;' A` ]1 , 1 ��110 Ilik �■wr y P4. PROTRACTED SECTION LINES SHOWN HEREON AREATIMPI 1. 1 �1. ■`- ■, (1 APPROXIMATE AND FOR REFERENCE ONLY. VICINITY MAP-NOT TO SCALE AS-STAKED "WALAKPA LEGEND PROPOSED"WALAKPA 11"WELL 11/12" DRILL PAD ® PROPOSED WELL LOCATED WITHIN 0 RP TO WELL T.20 N.,R.19 W.,U.M., SECTION 21 T 20 N, R 19 W, UM SECTION 16 T 20 N, R 19 W. UM SECTION 21 NAD 27,ZONE 6 AT 0 O LAT:71'04'20.1984'N 380 WAL-12 RP2 WAL-11 RP2 a;� w;F fig- WELL RP DISTANCE TABLE LONG:156°53'33.9725"W N=6,243,159.55 WAL-11 WAL-12 E=631,552.72 1 0 RP1 244.16' 243.55' NAD 83,ZONE 6* 4, R. RP1 Z RP2 353.96' 353.38' NI 0 LAT:71'04'18.6608"N LONG:156'53'46.3556"W 69'20' I. N=6,242,847.06 .1, E=1,771,557.78 0 50 100 PROPOSED"WALAKPA 12"WELL SCALE IN FEET LOCATED WITHIN T.20 N.,R.19 W.,U.M., SECTION 21 PROPOSEDi/ NAD 27,ZONE 6 PAD — / /`/ 7.0' LAT:71'04'20.2097"N 7 0' LONG:156'53'33.5490"W 1661±'—tv N=6,243,160.96 E=631,56668 o `" `i NAD 83,ZONE 6* z 0 o PROPOSED 3 0 v PROPOSED- LAT:71'04'18.6722"N N N `1 "WALAKPA 12" : LONG:156°53'45.9321"W s "WALAKPA 11" WELL N=6,242,848.47 > > WELLE=1,771,571.74 N 3 3 o ur 'CONVERTED BY NAD CON o o_ o N o N N_ `1`�`\\�\ z - -- OFA(gill • SURVEYORS CERTIFICATE *• 49 TH * a �I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE 0 4-27-1' STATE OF ALASKA AND THAT THIS AS-STAKED EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY m DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF APRIL 22,2011. , KENNETH J.PINARD • i �+F15,, No.11545 ,•� � g immal.� PETROTECHNICAL 0 Lewy. 1� ;` ••• • • . `S°.-- h I,, 1 p1°PESSIONA\.\p�— '- 1 RESOURCES \��,,.���- O ALAS an Ukpaagvik Inupial Corporation Company C DRAWN BY:LHH I CHECKED BY: KJP I W.O. No: 2009-214—A 3 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la.Type of Work: lb.Current Well pass: Exploratory ❑ Development Oil ❑ 1c.Specify if well is proposed for: Drill 0 Redrill Stratigraphic Test ❑ Service El Development Gas Q Coalbed Methane ElGas Hydrates El Re-entry 0 Multiple Zone n Single Zone n Shale Gas El 2.Operator Name: 5. Bond: Blanket 2 Single Well❑ !11.Well Name and Number: North Slope Borough-Barrow,Alaska Bond t.&. CD 17430 Walakpa#11 3.Address: 6.Proposed Depth: 12.Fied/Reol(s): Dept.Public Works,1689 Okpik St.,Barrow,AK 99723 MD 5355 ft. TVD: 2343 ft. WALAKPA 4a. Location of Well(Governmental Section): 7.Property Designation: Surface: 2555'FNL,1654'FWL,UM Section 21,T20 N,R 19 W WALAKPA Top of Productive Horizon: 8.Land Use Rerrrit: NSB Development '13.Approximate Spud Date: 2198'FSL,766'FE.,UM Section 20,T 20 N,R 19 W UIC Rivate Land Permit No.10-252 20-Jan-12 Total Depth: 9.Acres in Property: 14.Distance to Nearest 1820'FSL,2236'Fa.,UM Section 20,T20 N,R 19 W 21,120 Roperty: 15,835 ft. 4b.Location of Well(State Base Rene Coordinates): 10.KB Bevation 15.Distance to Nearest Well Surface: x 631553 y- 6243159 Zone-6(NAD 27)(Height above GL): 21.5 feet Within Fbol: 14 ft.-Walakpa#12 16.Deviated wells: Kickoff depth: 250 feet 17.MaximumAnticipated Ressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 89 degrees Dow nhole: 1008 psig Surface: 780 psig 18.Casing Rogram Specifications Top(rkb) - Setting Depth - Bottom(rkb) Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD ND (including stage data) 26 16" 84# L80 Weld 80 21 21 101 101 Single Stage:265 sxs. 12 1/4" 95/8" 40# L80 BTC-M 1152 20 20 1172 1153 Lead:126 sxs,Tail:450 sxs 8 1/2" 7" 26# L80 BTC-M 3788 19 19 3807 2288 Single Stage:43 sxs. 6 1/8" 4 1/2" 12.6# L80 BTC 1698 3657 2255 5355 2343 production-slotted liner 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth ND(ft): Rugs(measured): Effect.Depth MD(ft): Effect.Depth ND(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Roduction Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Filing Fee Q BOP Sketch Q Drilling Rogram E Time v.Depth Rot Q Shallow Hazard Analysis 0 Property Rat Q Diverter Sketch Q Seabed Report Q Drilling Fluid Rogram 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Comrission Representative: Date 22. I hereby certify that the foregoing is true and correct. Contact Rinted Name Title Signature Phone Date Commission Use Only Flarnit to Drill AR Nurrber: Hermit Approval See cover letter for other Number: 50- Date: requirements. Conditions of ap*frbaa l is checked,w ell may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shale Other: Samples req'd: Yes 0 No 0 Mud log req'd: Yes[] No[] R2S measures: Yes Nb❑ Directional svy req'd: Yen APFROV®BY THE COMMISSION DATE ,COMMISSIONER 4 :, .. . ..... .. ,..„ ._ ..... ....._:. MIA Walakpa#11 :Horizontal Gas Engineer: M.Cook Field:GL=31.7 ft.above Sea Level Development Well Rig: Kuukplk#5 RKB elev.:213(pad loll) 011 FORM D67111-(kb) 1101E517E CASING SPECS MUD INFO C FM INFO INFO D1R/LW D MWD LOGS MD 1VD '..... 16 in.84 Ibill ISO Well Head:Veico Ckay, NONE NONE Pern : ialiust I/O100 100 :: :. 26" ::•:•:•:•: Wddod MB230,2-1/16"5M ........ •:. KOP:Mel 0 deg. 250 250 :•:. '.. '.' Spud Mud DLS,2.50 deg/100 ::•*. ..... ' ... ••.; .•.• • SRO-GYRO 0 500 •:.: I end Cement-"L" ROC:5410 IL>>surface :••.• ::: •:.: Density:10.7 ppg Cement MWD/GR/RES :::. .. Excess:150% •••••• ••••••. '.... :::: •.• Tail Cement-"C" .... ...: TOC:500 IL Freeze Protection:Annuli To ••••.• ....: :.: Density:15.6 ppg Cenvnt 9-5/8" .... Base of :••• .. Excess 150: w/diesel Pernsaliost: 900 ss 900 ss •:::: :••.• '... S.Mille.L_CAILIg :::: •.• 9-5/8"40 lbs/11 130 BTC-M •:.: Internal Yield:5,750 psi •-• :::. (011apse:3,090 psi Casing Test:2500 psi/ EOB:incl.=21.0 deg. Casing Point 1172 1153 12-1/4" KOP:Mel.=21.0 deg. 1202 1181 PHPA:LSND/Barasan D FTP:13.0)ppg EMW Production Tiding 2-7/0 6.5 lbs/It MWD/CR/RES L80 EUE Internal Yield,10,570 psi Collapse:11,170 pe Top HRZ/Pebble 1733 1645 MI-Prevention:Methanol Shale Injection via 2-7/8"lupin:01:01 ......: :•:. EOB:incl.:70.03 deg. 1903 1658 DLS:7 deg./100 ....• :•:.: ........: blermedate Casing r 26 lbs/11 L80 BTC-M :•:.: ::•*. 'menial Yield:7,240 psi Casing Test:2500 psi I ::::: •::: Collapse:6,000 pe lailCsment KOP:incl.=70.03 3557 2223 Type:ArelicCem LT TOC 4nd : .......... 33417 11. Casing Poini 3807 2288 .... H:::: Day:12.5 ppg Cement :•:. ;•.•: FOB:incl.:81.00 deg. Top:Walalqna .....• •::: Ex Liner Hanger/Packer IRS:4 deg/100 Gas Sand-(Hod) 3837 2293 '..' ...... /TB.Ext:BHI Model:SLZXP I:::s1 Isle 8-1/2" Una Lap:1500. BARADRILL-N/KCL / KOP/Build 81.00 deg. 3881 2300 (6%) FIT:13.(Mppg EMW EOB:88.9 deg. 4078 2317 DLS:4 deg/100 MWD/CR/RES LWD:Neu/Den (Neutron Logging/ dependent up.hole condemns.) Production liner- SIlow 4-1/r 12.6 lbs/11 1.81.1BTC TD-Walakpu 5355 2343 AL 6-1/8" Target(Toe) Date Rev by Comments 5/11/2011 MCook Wei Rapping Reparation Reerinary 5 Well Name: Walakpa #11 Drill & Evaluate Summary Type of Well (service/producer/injector): Methane Hydrate—Horizontal Test Well Surface Location: Located within : 1654' FWL 2555' FNL T.20 N.,R. 19 W.,U.M. Section 21 NAD 27 ZONE 6 : N=6,243,1M E=631,553 Target Walakpa T1 —(Heel) 766' FEL 2198' FSL T.20 N.,R. 19 W.,U.M. Section 20 Top Walakpa Gas Sand NAD 27 ZONE 6 : N=6,242,589 E=629,144 TVD/SS: 2240 -ft Target Walakpa T2—(Toe) 2236' FEL 1820' FSL T.20 N., R. 19 W.,U.M. Section 20 Base Walakpa Gas Sand NAD 27 ZONE 6 : N= 6,242,185 E=627,682 TVD/SS:2290 -ft AFE Number: Rig: Kuukpik#5 Estimated Start Date: Jan. 20, 2012 Operating days to complete: 23 MD: 5355 TVD: 2343 Max Inc: 90 KOP: 250 KBE(GL): 21.5 ft. (rkb) (rkb) SS - GL 6 ft. Well Design (conventional, slimhole, etc.): Slimhole—Development/Horizontal Gas Producer Objective: Drill and complete slimhole horizontal well—targeting the Walakpa gas sand interval. Drilling Fluid Program: 12-1/4-in Surface Hole Fluid Properties: Spud—LSND Freshwater Mud Density(ppg) Funnel Vis YP HTHP pH API Filtrate LG Solids 8.6-9.2 75 -300 25 -60 N/A 9.0-9.5 < 12 < 6.5 8-1/2" Intermediate Hole Fluid Properties: Polymer/ LSND/Barazan D+ Density (ppg) PV YP HTHP pH API Filtrate LG Solids 9.2- 12.51 10-20 25 -30 10 - 11 9.0-9.5 < 6 < 6 6-1/8" Production Hole Fluid Properties: Drill in Fluid : Baradril—N/KCL Density (ppg) PV YP HTHP pH API Filtrate LG Solids 9.2-9.4 / 10- 12 15 - 18 10 - 11 9.0-9.8 < 6 <4 Note(s): 1. Drilling fluid densities may require increasing due to borehole stability requirements while drilling the HRZ section. 6 Waste Disposal: RCRA Exempt—Class II Wastes Drilling fluid : Option #1: EB-15 UIC II well. EB 15 to be certified as a UIC II disposal well. Option#2 : ANNULAR INJECTION in permitted Walakpa surface x production casing annuli. Drill Cuttings disposal : Option#1 : Barrow Municipal Landfill Option#2 : stored/barged to G&I Facility(PRB ) disposal site. Waste Disposal: RCRA Exempt—Class I Wastes Option#1 : disposed of locally- Barrow Municipality Casing/Tubing Program Hole Size Csg/ Wt/Ft Grade Conn Length Top Bottom Tbg O.D. MD/TVDrkb MD/TVDrkb 26 0-in 16 -in* 84# L-80 Welded 80-ft 21-ft 101-ft 12.25-in 9.625-in 40# L-80 BTC-M 1152-ft 20-ft 1172/1153-ft 8.5-in 7.0-in 26# L-80 BTC-M 3788-ft 19-ft 3807/2288-ft 6.125-in 4.5-in 12.6# L-80 BTC 1698-ft 3657/2255-ft 5355/2343-ft Cement Program: Casing Size 9-5/8", 40 ppf, L-80 BTC-M Type: Surface Casing to 1172/1153' and/tvd Basis for Calculation Shoe depth: 1172/1153 ft-md/tvd (rkb) : 80-ft. shoe joints, 150% excess in permafrost (12-1/4"hole), and cement to surface. Cement Volume: Spacer 5 bbl of water, 10 bbl CW 100 and 40 bbl Mud Push Lead— Halliburton Type"L" : Density: 10.7, Yield: 4.15 cu.ft/sk, Mix (BOC @ Water: 19.5 gal/sk 546 ft.) Sxs : 126 Tail Halliburton Type"C" : Density: 15.6, Yield: 0.95 cu.ft/sk, Mix (TOC @ Water:3.83 gal/sk 546 ft.) Sxs • 4 Temp 36 derF @ 1046/1028ft. and/tvd 7 Casing Size 7", 26 ppf, L-80 BTC-M Type: Production Casing(long string) : 3807/2288 ft. md/tvd (rkb) Basis for Calculation Shoe depth: 3807/2288 ft-md/tvd (rkb), 85-ft. shoe joints, 30% excess in open hole. Top of cement (TOC) located 500 ft. above Upper Barrow Gas sand. Single Stage : ArcticCem LT Cement Volume: Wash 5 bbl water, 10 bbl CW 100 Spacer 30 bbl Mud Push Tail Halliburton Type"ArcticCem LT" : Density: 12.5, Yield: 2.36 (TOC @ cu.ft/sk, Mix Water: 13 gal/sk 2897 ft. Sxs : 43 and-rkb) Temp 57deg. F @ 3397/1986 ft. md/tvd Evaluation Program 12.250-in Surface Hole: Open Hole Logs: • Logging while drilling(LWD) with directional will be utilized in lieu of open hole e-line formation evaluation logging runs. • LWD Directional/Gamma/Resistivity 8.5-in Intermediate Hole: Open Hole Logs: • LWD Directional/Gamma/Resistivity 6.125 Production Hole: Open Hole Logs: • LWD Directional/Gamma/Resistivity/Neutron/Density1 • Note 1: Neutron/Density porosity collar utilization is dependent upon hole 6-1/8"hole conditions. Cased Hole Logs: • not required 8 Formation Markers Commercial Est. Formation Hydrocarbon Tops Uncertainty Bearing Formation (TVDss) (feet) (Yes/No) Surface Hole: Base of Permafrost 900 +/- 100' no 9-5/8 csg pt 1000 +/- 25' n/a Intermediate Hole: Top HRZ 1845 +/- 50' no Base HRZ 1880 +/- 50' no Hydrate Stability Zone 1980 +/- 100' n/a Top Walakpa SS (at Heel) 2240 / +/-25' yes / Intermediate csg pt 2247 +/-25' n/a Base Walakpa SS (at heel) 2270 +/-25' n/a Production Hole: Top Walakpa SS (at toe) 2270 +/-25' yes Base Walakpa SS (at toe) 2300 +/- 25' yes LCU/Kingak Shale 2300 +/- 25' no Recommended Bit Program BHA Hole Size Depth (MD) Bit Type Nozzle #100 12.5-in 0-ft— 1100-ft QHC1GRC-Tooth Bit 3-15 & (IADC Code-117W) 1-10 #200 8.5-in 1100-ft— 1900-ft QHC1SD-Tooth Bit 3-15 & #300 (IADC Code-117W) 1-10 2000-ft— 3850-ft FX65-Fixed Cutter (IADC Code-M323) #400 6.125-in 3900-ft — 5354-ft TD FMF3543ZZ-Fixed Cutter 3-12 #450 IADC Code: M433 Well Control 9 Surface Interval— 12.25" BOPE—Surface Interval— 12.25" 21 1/4 " 2M MSP Maximum anticipated BHP 540-psi (8.65-1b/gal @ 1200-ft TVD/ss) Maximum surface pressure 420-psi (0.1-psi/ft gas gradient to surface) Planned BOP/MSP test pressure 1000-psi/250-psi Casing Test Pressure : 2500-psi 9 5/8" 40# L80 BTC-M BOPE5 Intermediate/Production—8.5" 11", 5M, Double ram with annular(Hydril - GL) k.6S Pp. Maximum anticipated BHP 1008-psi(9 41/:. @ 2240-ft TVD/SS—top Walakpa Sandstone) Maximum surface pressure 760-psi (0.1-psi/ft gas gradient to surface) Planned BOP test pressure Rams test to 3,500-psi/250-psi. Annular test to 2,500-psi/250-psi Casing Test Pressure : 7" 26# L80 BTC-M 2500-psi Planned drilling fluid: Intermediate : LSND/Barazan Polymer Production : Baradril "N"/KCL (6%) Drilling Hazards & Contingencies: • Sticky clays may be present from the lower permafrost on down to intermediate casing point @ 3836/2293 and/tvd. • The HRZ interval exists in the well from 1845-1880 tvd/ss. Expect borehole stability(sloughing shale/drag/loss circulation/swabbing)problems while this interval is open. • Intermediate hole section KOP is planned under surface 9-5/8"40# L80 casing. DLS will range in the 7-8 deg/100— initial well inclination to be built to 70 deg. Manage drilling ROP's and hole cleaning requirements as needed. • Tight hole conditions noted in the Walakpa#5 well : 1600—2210 ft./tvd. • Drilling fluid density increases may be required to the 12.5 ppg range— should 8-1/2"hole conditions dictate. Lost Circulation • Loss circulation event is noted in the Walakpa#5 well at 2167 ft/tvd. Expected Pressures • The Walakpa gas sands are normally pressured with an anticipated reservoir pressure of 1008 psi @ 2293 ft./tvd. g Pra- Hydrocarbons: 10 reaching the top of the Walakpa sandstone in the well, prognosed at 3836/2293 tvd/md rkb. Faults • No fault intersections are expected. Hydrogen Sulphide • The Walakpa Gas Field is not designated as H2S area. H2S is not expected. Anti-Collision Issues • Walakpa#12: 14 ft. to 275 ft. Reference anti-collision (travelling cylinder) report included in Well Data Package. Distance to Nearest Well: • The Walakpa#12 well— 14 ft. at surface. Conductor to conductor separation distance. ��✓•hay, a75"" kA, 1 Gir• 11 Walakpa #11 Drilling, Evaluation & Complete: 1. MIRU the Kuukpik #5 drilling rig on the pre-installed Walakpa #11 16" conductor/cellar. Install MB 230 Vetco Grey landing ring on 16" conductor. Reference the conductor installation procedure for wellhead orientation requirements. 2. Take on water and build spud mud. 3. Function test 21-1/2" 2M MSP Diverter System. Test to 1500 psi high / 250 psi low. Notify AOGCC representative 48 hrs prior to diverter system test. 4. PU 12-1/4" ( BHA #100 ) : QHC1GRC drill bit on HES performance motor (8"Sperry Drill lobe 4/5 — 5.3 stage) assembly w/ MWD/GR/RES and drill to surface KOP @ 250 ft tvd/md. Build wellbore inclination angle to 17 deg w/ 2.5 deg./100 DLS. Perform SRO Gyro surveys to 500 ft md. Function test MWD collars and performance motor. 5. Drill 12-1/4" hole section to surface 9-5/8" 40# L80 BTC-M csg . point @ 1172 ft. and/1153 ft tvd. Manage drilling fluid (spud mud) rheology, funnel viscosity to be maintained in the 250-300 sec. /qt. range. 6. Circulate and condition 12-1/4" surface hole for surface 9 5/8' 40#L80 BTC-M casing running. 7. Run 9-5/8", 40#, L-80 BTC-M surface casing to hole section total depth: 1172 ft. and/ 1153 ft tvd. 8. Cement 9-5/8", 40#, L-80 BTC-M casing w/ HES Type "L" (10.7 ppg lead) and Type "C" (15.6 ppg tail) cement blends. Confirm cement returns to surface. Perform top job if cement returns are not confirmed at surface. 9. ND 21-1/4" 2M MSP, install Vetco Grey 5M wellhead , NU DSA and Shaffer 11" 5M BOPE — test BOPE, choke manifold, stand pipe & surface IBOP's and safety valves. Test Shaffer 11" 5M BOPE to 3500 psi/high — 250 psi low. Annular preventer to be tested to 2500 psi/high — 250 psi low. Position HES Geospan unit in sub-base on BOPE trolley, MU hydraulic connections to Geospan unit. 10. PU 8-1/2" ( BHA #200) : 8-1/2" QHC 1 SD drill bit on HES performance motor (7" SperryDrill Lobe 7/8—6.0 stage) assembly w/ MWD/GR/RES collars—test MWD collars while RIH. RIH to 9-5/8" 40# L80 BTC-M float collar. Circulate well to intermediate interval drilling fluid — LSND/Barazan D . 11. Test 9-5/8" 40# L80 BTC-M surface casing to 2500 psi. Record/chart casing test on Barton recorder and submit with daily IADCC report. 12. Drill out float collar shoe track, float shoe and 20-ft of formation to 1192/1171-ft and/tvd rkb. 13. POOH to 1205-ft and and perform FIT to 0.68 psi/ft equivalent (13.00 ppg). 14. RIH - drill 8 1/2" hole section with BHA #200 (MWD/GR/RES) to KOP @ 1201/1181 ft. and/tvd. Directionally drill , building wellbore inclination angle to 77.53 deg. @ EOB @ 1903/1858 ft and/tvd. (DLS = 7 deg./100 ft). Manage cased and open hole friction factor(s)/drag with additions of NXS lubricants—range (3-6%by volume/as required) 15. Circulate 8 %2" wellbore, short trip to 9 5/8" 40# shoe @ 1172/1153 —ft tvd/md rkb. Back ream as required w/Tesco top drive through HRZ interval. POOH. 16. PU 8-1/2" ( BHA #300) : 8-1/2"FX65-Fixed Cutter drill bit on HES GP 7600 Rotary Steerable(GABI) assembly w/ MWD/GR/RES collars — test MWD collars while RIH. Drill 8-1/2" tangent section to 7"26#L80 BTC-M casing point at 3807/2288 ft.md/tvd. 12 17. Circulate 8-1/2" wellbore, minimum 2x bottoms up, short trip to 9-5/8" 40# L80 BTC-M shoe. Prep rig for running 7" 26# L80 BTC-M intermediate casing. 18. Run & cement 7" 26# L80 BTC-M intermediate casing_with HES ArcticCem LT- single stage. Land 7" 26# L80 BTC-M casing hanger in casing head of Vetco Grey MB230 11" 5M well head. RILDS - energize packoff assembly and test to 3500 psi. Test Vetco Grey 11" 5M wellhead to 3500 psi. 19. PU 6-1/8" ( BHA #400) : 6-1/8" FMF3543ZZ-Fixed Cutter drill bit on HES GP 5200 Rotary Steerable (ABI) assembly w/ MWD/GR/RES/Neutron/Density collars —test MWD collars while RIH. RIH to 7" 26# L80 BTC-M float collar. Circulate well to production interval drilling fluid — Baradrill N/KCL(6%). 20. Test 7" 26# L80 BTC-M intermediate casing to 2500 psi. Record/chart casing test on Barton recorder and submit with daily IADCC report. 21. Drill out float collar shoe track, float shoe and 20-ft of formation to 3827/2292-ft md/tvd rkb. 22. POOH to 3323-ft and perform FIT to 0.68 psi/ft equivalent (13.00 ppg). 23. RIH - drill 6-1/8" production hole section with BHA #400 to interval total measured depth at 5355/2343 md/tvd. Manage cased and open hole friction factor(s)/drag with additions of NXS lubricants — range (3-6% by volume/as required). Short trip 6 1/8" horizontal hole section, circulate annulus 2x. Back ream as required through tight hole sections. 24. POOH w/ BHA #400. Prep rig to run 4 1/2" 12.6# L80 EUE-8rd slotted liner with BHI SLZXP liner top packer/hanger/tie-back extension assembly. 25. Rai w/ 4 1/2" 12.6# L80 EUE-8rd slotted liner on 4" 14.4 # S135 XT39 dp. Set SLZXP liner top packer/hanger assembly w/ 150 ft. liner lap in 7" 26# L80 BTC-M intermediate @ 3657/2255' md/tvd. POOH. 26. RU to run 2-7/8" 6.5 # L80 EUE completion string. RIH w/ completion string, space out 2- N c '' 7/8" 6.5# WLEG at 100 ft above top of 4-1/2" 12.6# L80 liner tie back extension. Circulate P``` 2-7/8" x 7" annulus to NaCL completion brine( 9.4 ppg). Land 2-7/8"tubing hanger in Vetco Grey MB 230 tubing head, RILDS — energize tubing hanger packoffs. Test tubing hanger/head assembly/ to 3500 psi. L/D 2-7/8" completion running equipment. Clear KD #5 rig floor. 27. Install mechanical isolation barrier (TWC) in Vetco Grey MB230 11" 5 M tubing hanger profile — test to 2500 psi. ND Shaffer 11" 5M BOPE & DSA. NU Vetco Grey 2-9/16" 5 M production tree assembly and tubing head adapter. Test production tree and adapter to 5000 psi. Record/chart casing test on Barton recorder and submit with daily IADCC report. 28. Pull TWC with lubricator. Set BPV. 29. Freeze protect well to 500-ft. 30. Freeze protect the 7-in x 9 5/8"-in casing down to 1172-ft MD. 31. Complete a post-rig inspection with the WH Pacific Operation representative prior to the rig moving off the well. 13 -< _ o rn 9 9 NN mco e.:2 i. r y 3 m m Z u I- 3 LtJq ul f)Wn<O N ��`„ ' 2 — 2 ir Q 0 c88 uoomv�v\mr.-tnrnn E22 Qm 4a - �p E(13.-`r$ 6000 >0o0 v.-m CI O)M o.- ZO0 Q Q Q Q� E. co N C N ?3 -1-4.U �OONRNOiNNn NO) CI)(� djp^N O Y F Lj am tmm .-mOvon .-m m _ 7+ + + O N V V)rOS .r n E In o `k03 al (13Y Y m S U m_� 000 NNNNM it�� 2 C CO N c9 m '- S; �(!1H Wa c o\� .00000.-00000 l0 m 10 f0 m 2. $ a (�� W00000CI0-000 @� _ 3i33� �\ m o oto LLOUOO_ON000 O m 0 \ W C` - r 0L j 11 1-i F' N r aMM„ 0 N • . 1\11 Cn ffn2(n2 a a a a rnoo ln00000000 s-Ino 16 UI �"' 0) 01 �° _J m WOOn 0000000 Za MOW- Z ❑Ms-W ) w i \I > c c OI ✓ mmmm ❑'oocvoovciaci j t� ^_nom 1(j� WO� CY �� a mw`�� aUi o o v r o O o v rn rn o Q m Y Y E U n m M M a U W „:▪_e.,� fa Pi oo.-lnoocvr-non �Mln i �� U a a,cocciui to I+ -Lnumrloomm OLL (7)gag .E a �� Q U ry j ll Cln CL NNNNM Z 3a4 NNN a_ n 3333 a. tn000mnovnMr-N In.. `) a�7 �OIn•_Mrnr ArOONrMtm 0 ' "'? 0 I -r - - 0 -4.0.0...,-.4-.0") 014-.W WC t .Nv - 7 CC O O B it t--) + ('MMO•VM Z mOmy M Fe-Nd W 0 ZaItoM W vanInIno Kvw Na ' '< U p00ln0Mmn0v00 W mm5 ���c 0 ��G , g7'1'" ›v0MNNInNNN1N0 ` ? I- �mnggi w G_L V O) OmU N1 _ (h 1) n��I,gryNNNN --0V 0 W Mn « 00000rr0000 BLO - v- n-- <00000OOaa99Cirym 0 J rvv pprlnuimu -cm -_-- _ n ID In In Will In In ul a u O <a U) o N ]r-om NNNNNNNNN OX Y V C N N m 0.11.-01,, 110000 0 M M 0 0 I n t n ° O m n U1 c000si m0000mm U 2 N - G N ❑ ooln rvryooIIU W 0 0 m m L \ /i_ nor-v not-t omvvov M E.-0-t... OIn M -•nNmvi 0 v 0 C \ ' a 0 Of J 0 r O N In M 1-00 In 1+)co np vl U W 11 FO Ll N�.M NU)�NO)m W m0u) .. m m \ \ CO v 0,- M M ° \\ 11 \ to U).-NM V In mrmm.-I- n. Tu .5 \ 1 y a) -------.--.._..__-- m L m 1I \ LU f-. vIi o d \ - N v p \ m m V J C = 0 W O O 0 mN p CN !7 V N i . inN \\ v \ \ N 0 •in C j-.'N N in m a N N CO .m f0 Lc - o O 9- a H In N 0 d Ac NU O m no I N la r m CO am m _t47 ea 0 N % .- W_ . = m o 0 N Ica of m a r - o co to 0 O) 4- 0 J N 10 n ti 0 r-3 I a m m a _mm^ n F° 0 --. 0 UW oO M -N G Q 2 O 0 QO m F 3 lL Q Z n r- o ❑ c7 wi M co J 12W O o ola .CIM u, Oto N - O.- - La Nm W C Z p to n n co o_ a 2\ O CO O C a M m t `) C m 0 W O W o m 1 N Cn C + ini a J ° CO oco Q N E °'+ o I `o m o N m la N CD I I I I I I I 1 1 l I I I 1 I I 11 1 I I I I -I. 11 I-.I..-1.-I .I. I. -1....I rT7TTT1 T1 j 1I 1 1 1 1T 1-T tIrTII T T 1T- 11-rT-I-1--1TT__.T_llr 0 0 0 0 to 0 0 0 0 0 0 0 0 0 0 In 0 In N 0 In 0 N 0 0 0 N 0 N I u) CI N to n O N 0 0 N N C- N N N N (uJ11 00g)4ldad !e3!uan anal N 1 _ 14. a F f o A T T Nm m a o st, 01 N v N, pp 1 tnd,r.ffi 2 yy R Z C NN o N g .mN@ m L m�_ _ .....1a, C f11� 0Ur 00 I- % ii S g @° S lY Q U 72 QS.0 N pg2 (nNfn _w ZO/ y U U U VI ZJJ yO 1tINN{p h�-NWf� u1 a E 1 .E .a�l' .^.•i mC9 C9 v fQ- Jf'ogooaDNWO�,tO.-• Q Pi m C �_i-lu d' .O 'A - � , cvv u� g .flrOD VV LO IOW O 'n R R' o tl(1 Og 3 ! �`� Y/ a§§ p NNNM .�g� CO z J >° 0 M.-h E U .tj2 t� Q ,, ON O t�l� o Oo.-olno O Z �rrI VI SOSOONO�O80 Q �r_v�v U, d �lq;�Q tt W VI 1R• R. d 01h y LLO OooOtV(700 �� r-o m < ib Si�1L c71 W E 0. r rs,f /' /I 10 m�v o Y ~ N _w p, f� a O Q • It 0 g-.1 ili•.:2,7, u 1 ngm _ m88�5�8888$88 > 3 r•i o ///,i -.thth= H poo�c�io�ov000 aory c 7 I WW 3000 m >� 0 so nulmv I` .a j • I i 2 E 3 t MN O g e� >. Nt, _ t� Z a 8 �g 3 8 8 I.-...-,,t., E ch h ooVh aW o :) .. C -� O J O O r In n n V h 00. I i LL c. • - a " ro m O o•-•"7.- a o o tv co r: c .a .� 2 g ww, mmmmm 7143mccaso iig2 A 8 d 2 853 � .m. vem N NCVNt? m c ! g,w6t t@n 181AA Z-.--- o N88$m�8.4.: �Fo' �, ot Q 2.. t� n I ��Q WN $ �ik i,iki! F �O.ciciA(•IOm N�28M to WI " >g8 1$ o 2-.$$ + p p{�•71v�fpINN� o N F-' Q� t 6 '4 ...i Ctm q Q N yo M IE N 9282gf oARttIorl r' to tp to.Y a Cz' �-t o ty O+ v cm g Z t 5 3 > p tp t+�tri t+� Q.4 4.3 .5 i1bit u C ••R .C lc9ry 0 O ~NN8N�r�NODB.h-v 01 F J U>2U 8 t M 14- NM��ONNNNN 3 �S y Ll ` 6o 86.-1,:Sfs. . gggggaa8888 L.. Q ` + E'R;AZZ oO r(`iu�i{nl�l�u'�!R _ V «` ,q U2- poM.- N NNNNNNN A - 1N 07,r (0 W ? ZS SOtry 2888886'88803 o O ` +Q 'n'NO.n a 3 3 g C oal�ag0oat.-g8 M N ht,m — w` - - c:1I8ig1nnmMvvOv NI( O oIMrO � $tnc,mhpt� o NM�� MMM V 141 _ r rn 8 0- h (/I.-NMVNmhW W,-,- v t V01 (/) g v — - as �J / 0Q Q _ , O N V rn c• 3 S °°+ $ CO e opo to o m 1.-1 t1 . O 54 v / ', Ars F W a Et u / 5 0� - 8 A Q —h of 0 O p] 'F 0 u .5 eI A z 0 0 tl lelQ Y ,r• F v, lEo- Jum �, Q s mil 'ii Q _ ; , ate $ M I 1. _ V 01 soM 7,TIIIIIIIIriiiiiI IIIIIIIIIIIIIjIIIII IIlilI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l 0 0 0 000 O 01 O 000 0 0 OOpp p O. r v. M Q' 0 •O 008 Q `O tl ("!/U Oct)(1_)91.ioN/(-)linos CD N E f9 i Lf1 T N = U Q • III I N • A N 1 U i t c L d 0 43 I CL 1-1 s It 4a a, a, Isso CI RI CI CI • N a) O N / to 13 Lf1 . { N A as . __ _. _ , Co „v loV oV IV IV 0 0 0 0 0 0 0 0 0 0 0 0 r-i N M Lf) L. 0 W C. .0 2 0 , i RECEIVED JUN 01 201f o►nmission Arc a 011&�aR Cens. C ncherge Petrotechnical Resources of Alaska Walakpa Zone 6 Walakpa Walakpa 11 Plan Walakpa #11 Plan: Walakpa #11 WP 6.1 Standard Proposal Report 09 May, 2011 HALLIBURTON Sperry Drilling Services 3 - lii Q 0 OI a 9 cl ra 1 N_N C 41) �� y3� Y Z U m 1- t -0 (IImnoi 0 .- ❑ N N 0 1285 y rn cn fn N r I a v c S al oo�n\ncnron.-torn, r22 c 00017 ( 0,1 -mc4mmm.- Z . ro COro � �1 QS d Co o EmU�m ¢`«-wwm �oorJvui oiNNnr�oi �0 °E.)4,244Q�L O_ 0- '4: N -c 10 33 0i a .-.-co Nv0 n0) inn E.-- o YYY. a O .H U) H ,_ $ cU-J •ppb, cJNNNM uo I CO ro CO CO* In�- o`re3 100000.-0 )000 ~.nom -. Zm co'175 EL m os N iv rm o 2 f_� . N .-- -..�- iT0on00�001000 -1"86. o .i w - - - F- n 0_ a.. 1O ` m Y a Cr S pS m t it tt u ik N maid L * ` Q a) E m m S of MO ooN- 0000000 Z 'ciao; Z pm.-� U w \\•\~ 5 fm�r,o moon _ 10 COC 'ao�c�c�novovo O Y �U env y Q) cr ' ¢ o 00 $m > .. 0 a i0ma C) .--ovmi '�c`n�y•GY �� i mw`InwE a �3 �_ �oovnomovrnmo g '^ U -.m �0 p a ll N 00'NOONr-nrnv 3 -m6 c7 a 'oocv ul u�m�on - E �� U 0 _ gnuruiv Ill ♦ �Nmmm�vutm LL m66c IY j 11 LL)1 d 0 !f torn OvO NrvNNm Z QQ� NNON d Cl i_-i? z m0000)--10. nol�ry Ul yp paimm } 0 ,o0w)- vvw-0 u $ i5'o \nmv -p ll l o r) tl i!Jt- 1- 0 O pp LL] \O m Z N N E H r N N _- m -- O ; mm QD NI•lm0 O Ul O - m @rte rn 00i0MNrtl�n00.4MN IL Q !Y c0 2 o U1._ ?r 1-&)9 ;,' FI�1 o r.-V w Z a aa=i c0 d i0 $ O) O nn Fl 0000 nr-0000 vU N •- F,- .-n <00000 m m DZ mm U 0) m 0 v n riivv oor- .:r-r- r-u)cnucm .-r 2 o v N rJ =o.-. ulmmmulmmmm v m m o O plJn1fn NNN NNNNNN of 01 fa W Y�SII.-\n(•) al v C CO ,0 \ u0 o 000mm0omu) o ni 1) mu c000mm o0 oomm U In a7 N 0 •-own �mm -1 U L - m00 nrvrvn0m.-0a0 Q ❑ a O 2 u ❑\ N� 9 iinomv poomnJ� nrnti nor.r.N-ID v vv c oN�.-mnhrJmUi m O v \ - 0 nrJor-o ry in cq H.o ocn�rpplmrpp a r 0 W \ / c0 H O Cl v).--co NN�.Jmci plM ON (`') \ \`y C 0 co U). Nimvcnco nmm.-.- N CO ❑C \ \\ a Y \ N 0 N .- - N v O \ N N v m a c O W - o To o O m i0 O o '1: =N Iv •Fi55 ❑ to o LO 1�'CO N co m a NCO N N N IR gC - O Q a O F O y N U) C N Al .2 O a � m m r m N m6 J a) E O O = mO ❑ N C m R o d o O w O a r ❑ mo = a • m a m m ON CI cn r- N12 g N O C OJryOO❑ N O m 2 Q O Q2 0Z N wo Oo o o w cTo cmtin n lie Cr In or p O Z m N c p > O U r O r m V O o aO 0c O ca)M m m rj m a0m Q J c N + a g _ J ° m o N E rn + o I a o a) o u) IIl 7 h m I I I I 1 1 i I II II I Iii 1 1 I i ill II-1 1- I r I r r rr )-r i i-r-Ir_)--1 r EiT r r-1 1--)----I- r-f-I 1 I r-1—E r-r rTr T-i -r E I-' I T if 0 0 0 N 0 0 0 O U) rJ N U) o O \n 0 oO OU) O U)CD 5- 0 N U) n ON U) r-. (WI 00S)41dea i onJon oral N N CJ N Sperry Drilling HALL I B U RTO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Walakpa 11 Plan Company: Petrotechnical Resources of Alaska TVD Reference: AS-Staked©53.20ft(31.7 GL-MSL/21.5 KB) Project: Walakpa Zone 6 MD Reference: AS-Staked©53.20ft(31.7 GL-MSL/21.5 KB) Site: Walakpa North Reference: True Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Wellbore: Walakpa#11 Design: Walakpa#11 WP 6.1 Project Walakpa Zone 6 Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 06 Using geodetic scale factor Site Walakpa Site Position: Northing: B,243.272.00 ft Latitude: 71.07 From: Map Easting: 631,535.00ft Longitude: -156.89 Position Uncertainty: 0.00 ft Slot Radius: Grid Convergence: 1.05 ° Well Walakpa 11 Plan Well Position +N/-S 0.00 ft Northing: 6,243,159.55 ft Latitude: 71.07 +E/-W 0.00 ft Easting: 631,552.72 ft Longitude: -156.89 Position Uncertainty 0.00 ft Wellhead Elevation: 0.00 ft Ground Level: 31.70 ft Wellbore Walakpa#11 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 11 (nT) BGG M 2009 11/16/2009 18.69 80.67 57,517 Design Walakpa#11 WP 6.1 Audit Notes: Version: Phase: PLAN Tie On Depth: 21.50 Vertical Section: Depth From(TVD) +NI-S +EI-W Direction Iftl (ft) (ft) (°) 21.50 0.00 0.00 255.16 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/-S +El-W Rate Rate Rate Tool Face (ft) (1 (°I (ft) ft (ft) (ft) (°/100ft) (°/100ft) (°I100ft) (1 21.50 0.00 0.00 21.50 -31.70 0.00 0.00 0.00 0.00 0.00 0.00 250 00 0.00 0.00 250.00 196.80 0.00 0.00 0.00 0.00 0.00 0.00 535 71 5.00 257.00 535 35 482.15 -2.80 -12.14 1.75 1.75 0.00 257.00 1.171.73 20.90 257.00 1,153.20 1,100.00 -34.76 -150.57 2.50 2.50 0.00 0.00 1,201.73 20.90 257.00 1,181.23 1,128.03 -37.17 -161.00 0.00 0.00 0.00 0.00 1,903 69 70.03 257.97 1,658.58 1,605.38 -140.50 -635.06 7.00 7.00 0.14 1.21 3,557.35 70.03 257.97 2,223.25 2,170.05 -464.44 -2,155.20 0.00 0.00 0.00 0.00 3,837.43 81.00 255.60 2,293.20 2,240.00 -526.47 -2,418.74 4.00 3.92 -0.85 -12.15 3,882.43 81.00 255.60 2,300.24 2,247.04 -537.53 -2,461.79 0.00 0.00 0.00 0.00 4,078.69 88.85 255.60 2,317.59 2,264.39 -586.11 -2,650.99 4.00 4.00 0.00 0.00 5,355 47 88.85 255.60 2,343.20 2,290.00 -903.62 -3,887.40 0.00 0.00 0.00 0.00 5/9/2011 9:49:29AM Page 2 COMPASS 2003.16 Build 73 Sperry Drilling HALLI B U RTO N Standard Proposal Report Database: Sperry EDM.16 PRD Local Co-ordinate Reference: Well Walakpa 11 Plan Company: Petrotechnical Resources of Alaska TVD Reference: AS-Staked©53.20ft(31.7 GL-MSL/21.5 KB) Project: Walakpa Zone 6 MD Reference: AS-Staked(c2 53.20ft(31.7 GL-MSL/21.5 KB) Site: Walakpa North Reference: True Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Wellbore: Walakpa#11 Design: Walakpa#11 WP 6.1 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +El-W Northing Easting DLS Vert Section (ft) 11 (') (ft) ft (ft) (ft) (ft) Inl -31.70 2150 0.00 0.00 21.50 -31.70 0.00 0.00 6,243,159.55 631,552.72 0.00 0.00 100 00 0.00 0.00 100.00 46.80 0.00 0.00 6,243,159.55 631,552.72 0.00 0.00 200 00 0.00 0.00 200.00 146.80 0.00 0.00 6,243,159.55 631,552.72 0.00 0.00 250 00 0.00 0.00 250.00 196.80 0.00 0.00 6,243,159.55 631,552.72 0.00 0.00 KOP Start Build 1.75 250.00 MD 300.00 0.88 257.00 300.00 246.80 -0.09 -0.37 6,243,159.46 631,552.35 1.75 0.38 400.00 2.63 257.00 399.95 346.75 -0.77 -3.35 6,243,158.72 631,549.39 1.75 3.43 500 00 4.38 257.00 499.76 446.56 -2.15 -9.30 6,243,157.23 631,543.47 1.75 9.54 535 71 5 00 257.00 535.35 482.15 -2.80 -12.14 6,243,156.53 631,540.63 1.75 12.45 Begin Directional Build 2.50 535.71'MD 600 00 6.61 257.00 599.31 546.11 -4.26 -18.47 6,243,154.95 631,534.33 2.50 18.95 700 00 9.11 257.00 698.36 645.16 -7.34 -31.79 6,243,151.63 631,521.07 2.50 32.61 800.00 1161 257.00 796.72 743.52 -11.38 -49.31 6,243,147.27 631,503.63 2.50 50.58 2 900 00 14 11 57.00 894.21 841.01 -16.39 -70.99 6,243,141.87 631 482.05 2.50 72.82 961.04 15.63 257.00 953.20 900.00 -19.91 -86.25 6,243,138.07 631,466.85 2.50 88.47 Base of Permafrost 1.000.00 16.61 257.00 990.63 937.43 -22.35 -96.79 6,243,135.44 631,456.36 2.50 99.29 1,10000 19.11 257.00 1,085.80 1,032.60 -29.24 -126.67 6,243,128.00 631,426.62 2.50 129.93 1,171.73 20.90 257.00 1,153.20 1,100.00 -34.76 -150.57 6,243,122.04 631,402.82 2.50 154.45 End Directional 1171.73'MD-9 6/8" 1,20000 20.90 257.00 1,179.61 1,126.41 -37.03 -16040 6,243,119.60 631,393.04 0.00 164.54 1,201 73 20.90 257.00 1,181.23 1,128.03 -37.17 -161.00 6,243,119.45 631,392.44 0.00 165.15 Begin Directional DLS 7.00 1201.73'MD 1,300 00 27.78 257.31 1,270.71 1,217 51 -46.15 -200.47 6,243,109.74 631,353.14 7.00 205.60 1,400.00 34.78 257.51 1,356.12 1,302.92 -57.46 -251.11 6,243,097.52 631,302.72 7.00 257.45 1,500 00 41.78 257.65 1,434.58 1,381.38 -70.77 -311.57 6,243,083.10 631,242.52 7.00 319.30 1,600 00 48.78 257.75 1,504.90 1,451.70 -85.90 -380.95 6,243,066.71 631,173.44 7.00 390.24 1,700.00 55.78 257.83 1,566.05 1,512.85 -102.61 -458.21 6,243,048.59 631,096.50 7.00 469.21 1,800.00 62.78 257.91 1,617.11 1,563.91 -120.66 -542.20 6,243,029.01 631,012.86 7.00 555.02 1,900.00 69.78 257.97 1,657.32 1,604.12 -139.78 -631.67 6,243,008.26 630,923.76 7.00 646.41 1,903 69 70.03 257.97 1,658.58 1,605.38 -140.50 -635.06 6,243,007.48 630,920.39 7.00 649.86 End Directional 1903.69'MD 2,000 00 70.03 257.97 1,691.47 1,638.27 -159.37 -723.60 6,242,987.00 630,832.22 0.00 740.28 2,10000 70.03 257.97 1,725.62 1,672.42 -178.96 -815.52 6,242,965.73 630,740.67 0.00 834.16 2.200 00 70.03 257.97 1,759.76 1,706.56 -198.55 -907.45 6,242,944.47 630,649.13 0.00 928.03 2,300 00 70.03 257.97 1,793.91 1,740.71 -218.14 -999.37 6,242,923.20 630,557.58 0.00 1,021.91 2,400.00 70.03 25797 1,828.06 1,774.86 -237.72 -1,091.30 6,242,901.94 630,466.04 0.00 1,115.79 2,500.00 70.03 257.97 1,862.20 1,809.00 -257.31 -1,183.22 6,242,880.67 630,374.49 0.00 1,209.66 2,600 00 70.03 257.97 1,896.35 1,843.15 -276.90 -1,275.15 6,242,859.41 630,282.95 0.00 1,303.54 2,605.42 70.03 257.97 1,898.20 1,845.00 -277.96 -1,280.13 6,242,858.26 630,277.99 0.00 1,308.63 Top HRZ 2,700 00 70.03 257 97 1,930.50 1,877.30 -296.49 -1,367.07 6,242,838.14 630,191.40 0.00 1,397.42 2.707 92 70.03 257.97 1,933.20 1,880.00 -298.04 -1,374.36 6,242,836.46 630,184.15 0.00 1,404.85 Base HRZ 2,800 00 70.03 257.97 1,964.64 1,911.44 -316.08 -1,459.00 6,242,816.88 630,099.86 0.00 1,491.29 5/22011 9:49:29AM Page 3 COMPASS 2003.16 Budd 73 Sperry Drilling H A L L I B U R T O N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well Walakpa 11 Plan Company: Petrotechnical Resources of Alaska TVD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Project: Walakpa Zone 6 MD Reference: AS-Staked @ 53.208(31.7 GL-MSL/21.5 KB) Site: Walakpa North Reference: True Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Wellbore: Walakpa#11 Design: Walakpa#11 WP 6.1 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +EI-W Northing Easting OLS Vert Section (ft) 11 (1 (ft) ft (ft) (ft) (ft) (ft) 1,945.59 2,900 00 70 03 257.97 1,998.79 1,945.59 -335.67 -1,550.93 6,242,795.62 630,008.31 0.00 1,585.17 3,000.00 70.03 257.97 2,032.94 1,979.74 -355.26 -1,642.85 6,242,774.35 629,916.77 0.00 1,679.05 3,000.78 70 03 257.97 2,033.20 1,980.00 -355.41 -1,643.56 6,242,774.19 629,916.06 0.00 1,679.77 Hydrate Stability Zone 3.100.00 70.03 257.97 2,067.08 2,013.88 -374.85 -1,734.78 6.242,753.09 629,825.22 0.00 1,772.92 3,200 00 70.03 257.97 2,101.23 2,048.03 -394.44 -1,826.70 6,242,731.82 629,733.68 0.00 1,866.80 3,300.00 70.03 257.97 2,135.37 2,082.17 -414.02 -1,918.63 6,242,710.56 629,642.13 0.00 1,960.68 3,400 00 70.03 257.97 2,169.52 2,116.32 -433.61 -2,010.55 6,242,689.29 629,550.59 0.00 2,054.55 3,50000 70.03 257.97 2,203.67 2,150.47 -453.20 -2,102.48 6,242,668.03 629,459.05 0.00 2,148.43 3,55735 70.03 25797 2,223.25 2,170.05 -464.44 -2,155.20 6,242,655.84 629,406.55 0.00 2,202.27 Begin Directional DLS 4.00 3557.35'MD 3,60000 71.70 257.59 2,237.23 2,184.03 -472.97 -2,194.58 6,242,646.59 629,367.33 4.00 2,242.52 3,700 00 75.62 256.73 2,265.36 2,212.16 -494.29 -2,288.12 6,242,623.56 629,274.20 4.00 2,338.40 3.800 00 79.53 255.90 2,286.87 2,233.67 -517.39 -2,382.98 6,242,598.73 629,179.78 4.00 2,436.02 3,807.41 79.82 255.84 2,288.20 2,235.00 -519.17 -2,390.06 6,242,596.82 629,172.74 4.00 2,443.31 T. 3,83743 81.00 255.60 2,293.20 2,240.00 -526.47 -2,418.74 6,242,589.00 629,144.20 4.00 2,472.91 End Directional 3837.43'MD-Top Walakpa SS(at Heel)-Walakpa 11 T1 3.88243 81.00 255.60 2,300.24 2,247.04 -537.53 -2,461.79 6,242,577.16 629,101.36 0.00 2,517.35 Begin Directional DLS 4.00 3882.43'MD 3,900 00 81.70 255.60 2,302.88 2,249.68 -541.85 -2,478.61 6,242,572.53 629,084.62 4.00 2,534.72 4,000 00 85.70 255.60 2,313.85 2,260 65 -566.56 -2,574.87 6,242,546.06 628,988.85 4.00 2,634.09 4,078 69 88 85 255.60 2,317.59 2,264.39 -586.11 -2,650.99 6,242,525.13 628,913.10 4.00 2,712.69 End Directional 4078.69'MD 4,10000 88.85 255.60 2,318.01 2,264.81 -591.41 -2,671.62 6,242,519.45 628,892.57 0.00 2,733.99 4,200.00 88.85 255.60 2,320.02 2,266.82 -616.28 -2,768.46 6,242,492.82 628,796.21 0.00 2,833.97 4,300 00 88.85 255.60 2,322.03 2,268.83 -641.15 -2,865.30 6,242,466.19 628,699.85 0.00 2,933.94 4,358.52 88.85 255.60 2,323.20 2,270.00 -655.70 -2,921.97 6,242,450.61 628,643.46 0.00 2,992.45 Base Walakpa SS(at heel)-Top Walakpa SS(at toe) 4,400.00 88 85 255.60 2,324.03 2,270.83 -666.01 -2,962.14 6,242,439.56 628,603.49 0.00 3,033.92 4,500 00 88.85 255.60 2,326 04 2,272.84 -690.88 -3,058.98 6,242,412.93 628,507.13 0.00 3,133.90 4,60000 88.85 255.60 2,328.04 2,274.84 -715.75 -3,155.81 6,242,386.30 628,410.77 0.00 3,233.87 4,700 00 88.85 255.60 2,330.05 2,276.85 -740.62 -3,252.65 6,242,359.66 628,314.41 0.00 3,333.85 4,800 00 88.85 255.60 2,332.06 2,278.86 -765.49 -3,349.49 6,242,333.03 628,218.05 0.00 3,433.83 4,90000 88.85 255.60 2,334.06 2,280.86 -790.35 -3,446.33 6,242,306.40 628,121.69 0.00 3,533.80 5.000 00 88 85 255.60 2,336.07 2,282.87 -815.22 -3,543.16 6,242,279.77 628,025.33 0.00 3,633.78 5,10000 88.85 255.60 2,338.07 2,284.87 -840.09 -3,640.00 6,242,253.14 627,928.97 0.00 3,733.76 5,200 00 88.85 255 60 2,340 08 2,286 88 -864.96 -3,736.84 6,242,226.51 627,832.61 0.00 3,833.73 5,30000 88.85 255.60 2,342.09 2,288.89 -889.82 -3,833.68 6,242,199.87 627,736.25 0.00 3,933.71 5,355.47 88 85 255.60 2.343.20 2,290.00 -903.62 -3,887.39 6,242,185.10 627,682.80 0.00 3,989.17 6.125 Open Hole-Walakpa 11 T2 5/9/2011 9:49 29,4M Page 4 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM 16 PRD Local Co-ordinate Reference: Well Walakpa 11 Plan Company: Petrotechnical Resources of Alaska ND Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Project: Walakpa Zone 6 MD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Site: Walakpa North Reference: True Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Wellbore: Walakpa#11 Design: Walakpa#11 WP 6.1 Targets Target Name -hit/miss target Dip Angle Dip Dir. ND +NI-S +E/-W Northing Easting -Shape (°I (1 (ft) (ft) (ft) (ft) (ft) Walakpa 11 T1 0.00 0.00 2,293.20 -526.47 -2,418.74 6,242,589.00 629,144.20 -plan hits target center -Point Walakpa 11 T2 0.00 0.00 2,343.20 -903.62 -3,887.40 6,242,185.10 627,682.80 -plan hits target center -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ("I (") 1,171.73 1,153.20 9 5/8" 9-5/8 12-1/4 3,807.41 2,288 20 7" 7 8-1/2 5,355.47 2,343.20 6.125 Open Hole 6-1/8 6-1/8 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (°) (1 4,358.52 2,323.20 Top Walakpa SS(at toe) 2,707.92 1,933.20 Base HRZ 4,358.52 2,323.20 Base Walakpa SS(at heel) 961.04 953.20 Base of Permafrost 2,605.42 1,898.20 Top HRZ 3,000.78 2,033.20 Hydrate Stability Zone 3,837.43 2,293.20 Top Walakpa SS(at Heel) Plan Annotations Measured Vertical Local Coordinates Depth Depth +NI-S +E1-W (ft) (ft) (ftl (ft) Comment 250.00 250.00 0.00 0.00 KOP Start Build 1.75 250.00'MD 535.71 535.35 -2.80 -12.14 Begin Directional Build 2.50 535.71'MD 1,171.73 1,153.20 -34.76 -150.57 End Directional 1171.73'MD 1,201.73 1,181.23 -37.17 -161.00 Begin Directional DLS 7.00 1201.73'MD 1.903.69 1,658.58 -140.50 -635.06 End Directional 1903.69'MD 3.557.35 2,223.25 -464.44 -2,155.20 Begin Directional DLS 4.00 3557.35'MD 3,837 43 2,293.20 -526.47 -2,418.74 End Directional 3837.43'MD 3,882.43 2,300.24 -537.53 -2,461.79 Begin Directional DLS 4.00 3882.43'MD 4,078.69 2,317.59 -586.11 -2,650.99 End Directional 4078.69'MD 5.355.47 2,343.20 -903.62 -3,887.40 TD at 5355.47'MD 5/9/2011 9:49 29AM Page 5 COMPASS 2003.16 Build 73 r 3 N a m )- 1- 0 O CO O r r 0 m (7) e 121 Z O L!*"- S a ro c'Yo m�=w� ��' u- >aaci 0 mO1on I--a a, i,-,In mpEauO ` ,-0,0740,'-'-. ' Nn NN Cl)r J • a C.C. m j'sN M(nM ' 000000NO'OOO J N ' ,TOO,nnOO�GN000 d u n FQ- O CO*u O�1 F- N j� W N mW(7)W E • ' - • ' o �_ 0 aS a t t moom000O0000 1_m } m 1 1 ! t • aFOOnm0000000 Al , ' i m W ooenomovmmo • • fi aN # ! i ! t !\ 1 ` 1 I i F j 00Nmoorynnpmv Vl Cr._ 'r t • ( 1 • • LLl tyJOO N,o mM Ommma0U F. C C t. Z \O - - NOOm��ig,a..-ro` ^ m U zooidncaonroac C 7) n � � '•^ a o o m o M m m o<00 /.1 i • ry >1/4000NNm NNO40 N Z M - N1flM mmm NmO,.t d • Nm.-.-.NNMMM m 3 j. ,-.- NNNNN • • N o 0 0 0 O n n 0 0 0 0 m <000000,00w.. o as o • 0 OO foul or [100o o IL o r.i rn O _ V N N N N N N N N N + 0 n- G n - u 0 0 0 0 0 0 0 0 m m 0) , amu 0000m0000000 /0 CO Nm G O66OOOO6.6 Z0 0 '; nryy 0 ryanIV OOS NNnnmmmm +o z Zh,im FLLl1125,4 1a�, '0n 7)w mNawv OZONm 3 nw O• nNnNdh O 2NOa u & E iVy E ,._NMOmmnmm0,- � f „ poSN ^ g 4g ^ r N m m -' ry ^ O HFINN Hm U m&Etmn•o Z g w,..7.,,'a' r aai O rano/to , '. ' N7) ZmO m Z ° v v • Q - pili ILWA .. in to s��41 ' Air'�1 10. 0l�' to r7) i ' , ♦wD/ o t i t 'tr • Fno7:a w �qt , . : d g�000 • 333 F-mMz2 ' , 1 1 I ! r 1 t I Ill V o �I 1 : , , I 1 1 I I ,__„, lir ...u ! 11 1 ! 1 1 1 + •• u. m m m ng LO' • 1 . 1 , ` 1 1 33 ` 1 `{ �' t 1 1 E mama Q n n 3333 `m ix > auuua v a$B.B.n o o N re > d (n v ('7)3333 • r Z _U 0 > CC En F-on.. M° • Cl 0 O m —L0 o ❑ Ci LL 0MO J B a'r'o,o L o�(��� ° 4 15 Ia N Sperry Drilling Anticollision Report Company: Petrotechnical Resources of Alaska Local Co-ordinate Reference: Well Walakpa 11 Plan Project: Walakpa Zone 6 TVD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Reference Site: Walakpa MD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Site Error: 0.00ft North Reference: True Reference Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Walakpa#11 Database: .Sperry EDM.16 PRD Reference Design: Walakpa#11 WP 6.1 Offset TVD Reference: Offset Datum Reference Walakpa#11 WP 6.1 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 733.40ft Error Surface: Elliptical Conic Survey Tool Program Date 5/9/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 21.50 500.00 Walakpa#11 WP 6.1 (Walakpa#11) SRG-GYRO-SS Conventional SRG single shots 500.00 1,171.73 Walakpa#11 WP 6.1 (Walakpa#11) MWD+SAG MWD+Sag correction 1,171.73 3,807.41 Walakpa#11 WP 6.1 (Walakpa#11) MWD+SAG MWD+Sag correction 3,807.41 5,355.47 Walakpa#11 WP 6.1 (Walakpa#11) MWD+SAG MWD+Sag correction Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) Walakpa Walakpa 12 Plan-Walakpa#12-Walakpa#12 W 274 89 275.00 14 23 5 25 8.98 p p p Pass-Major Risk 5/9/2011 9-38:55AM Page 2 013 COMPASS 2003.16 Build 73 Sperry Drilling Anticollision Report Company: Petrotechnical Resources of Alaska Local Co-ordinate Reference: Well Walakpa 11 Plan Project: Walakpa Zone 6 TVD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Reference Site: Walakpa MD Reference: AS-Staked @ 53.20ft(31.7 GL-MSL/21.5 KB) Site Error: 0.00ft North Reference: True Reference Well: Walakpa 11 Plan Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Walakpa#11 Database: .Sperry EDM.16 PRD Reference Design: Walakpa#11 WP 6.1 Offset TVD Reference: Offset Datum Reference Depths are relative to AS-Staked @ 53.20ft(31.7 GL-MSL/ Coordinates are relative to:Walakpa 11 Plan Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 06 Central Meridian is-158.00° Grid Convergence at Surface is: 1.05° Ladder Plot 800— I i I i 1 ._J _. __ .. _ _ _. ... .__J_ _ __ _.._ _. _ _ .. ._. _:_. � I 1 I 600— i N C (O (d I I d . N (n 400— I N I Ca a) i I U _ _ _ __ __ _. — _I_ ____ _ _.: _ __ J_ .J_.. __ ._ _ - J p I I + i { C I I v 200— •• • J J _ J J _I � I I i I . 1 I 0 I I I I II 0 250 500 750 1000 1250 1500 Measured Depth(250 ft/in) LEGEND 12 Plan,Walakpa#12,Walakpa#12 WP 5.1 VO -e- Walakpa#11 WP 6.1 5.9/2011 9.38:55AM Page 3 of 3 COMPASS 2003.16 Build 73 NSB Barrow Gas Fields Well Drilling Project .LI iclr-...E.",.."7",MRYISP.T.0791PN`'. ,'''' ,....., IN • .4, Ai fie 1 n-- i.J !tea- Mo.., f I 1 . . Ikk j14 4 * - . 0 - ." .. --,7,PlOW "1 ' SOUTH 1 1 ,..a. GS " i•'1 FJEL 0 4: t er' 1 i 1 f• ' - :- '* ,• s . )6 ''" 4t.krzy„:"' ...,'..C4P ' „I :.; .... '' ,•,„ • „ 4te' 0 • i - ,IL, 'I- Is •• . *' -ft.;,,,,,,it-,.. - - . ma? • 'l'.., !Li* ' GAS ,... • . * ' ilk o i VELD r72st r , i,v 3 ifili . .. e .r 4r, ..4 E=ra czsz,xt %EP,.'... "-%*, ' , ' +' .. ..!... ` C - . 5* . . it / ^ \ Vk , ,.., 1-2,114 r:2rv, I 40 „ .... totiA.. t L z, IIA '1-23 Fel t, 414 1 ........r...'''' • i ,.....,.......... .1, . IA i IL t 4 - . , ,., ...„ / .. , ••Al'I 1..ai 1 I•I.t I-E b..-,1.1.'..:_At.HE.-. -UFt...... 1.I.1 .....1_,.„..-._L vi_ _ NI ,PTHUPPE C.) ,, ,...:P,3, I ,`•/'I , A1 F. g,CA G.S.EL: ,... at.1J...1C 0 4E. C.E.-•.C..,T.-INFP ..E.IE.,- 1.111".,..11F-.,- o or. 1 , ,..EKEIV 1.1-F-A.F.,i :7 •F./t-ir. • _LI$„I _' L 12 li-J L Barrow Gas Fields Project Overview Page 1 of 44 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHCKLIST WELL NAME IL)A let ' I PTD# 2 / ry_--% Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: k/(it (47cPOOL: l Lit Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name)must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 mm 3 o r -3 (a T 'a 3 I 0 m o 0 ° O cn v 3 0 ? ?# r 0 3 p .< co m 3 o v, 6> 5 oi y o m 0.(fl -, D o o f° - 0 o W X m m o E 3 c' 0 m 0 0 o CD m -I W W W W W W W W W W N N CJ N N N N N N N O co V Co C)) A Co N - ° I (0 0) --) Cr) Co A Co N -, 0 (o Co V 0) Co A Co N -, 0 (0 Co 0) 01 A co N - 0 v m 0 Co to 0 m K F * 0 W Co 0 �. D D 0 0 0 o co o -a D * o v m O O �, to * * * C r- m z ,c n 0 o CD CD Cu m ° 3 p p c n n v n (v c o = n) m CD -co -o a c 0 CD (D o N 7 N o O = CD CD 0 _1 _1 -i 7 (D CD 3 (D (D CD �: CD CD (D N I- 5 d o o m m m 5 m a m a 5 < d o - 0 3 < 3 z r • o o v n m o c c o * < < o c - o (D ^ ni o 0 o m o 0 y • C1 c7 (1 3 (D *. 3 'O N a• Cu d N = 0 O (D O 0 N C) (7 n O O N 0 0 O 7 C .Z7 o C) n) (noto C) c_i - (v ' n c -, 0 - m m f) n) m c) o c F v 3 n) 0) n 3 sv n) (v m c 0 < -1 -I 3 2 N co Q N 0 o ? ° °- CD < S v N N y o S a r. n Q Q a = Q cl)d •• 2 m cD d •••Z p. CD o O ° N o a Q coomC GI N .O 4 ?. n 5 m 0 Sr `< !n CD -O -° °�j p) r CO • 7 0 (n O N Q 2 n Ca (p O N (fl CU n) CU -O co ?. 7' CU co 5 b 4 N (0 O O CU 3 0 5 co p n 0 O O 7 c ^ 0 o' o (0 3 N a N _s CD a - CD CD 3 -O n A 5' -0 co c 'O n Q O CD N C1 (D D O o r S?0 'm c u ° n o 0 3 m 3 ° ° a o 0 o m o 0 3 m 3 n a m ° °<) a a 3 O. m o z 7 ° N ,O•. -"O "O (n O O A C O ... a - < a co 0) 7 0- "O W o o m o ° 0 N o CD s 0 ° o co (v c 'r " ° CD a ED v a - - -0 'o m m v co 0 n ° a) 0 3 o f o ° m v o m m -0 c c ° c m o o (T CD 0 �' 0. o ° o c m v p F. _. m m o co o n v m y 3 0 0 3 0 °) ,� °: -o n o CU 0 ° '< c CD m, m °o Q o C D o CD < N m Q o 5. c m =p Cu n o v o n c a 3 3 cDn 2 0 2, p o 0 3 CD - m N m Q° CD o Q -i 0 0 0 m 3 N c - 3 3 7 0 c CD O 5 �a- ] ,N. CD (0 0 0 W 1D 7 o C CD CO d �' (D 0 n j o a D co cD coco c > a w ° ti' ») a 3 w o0 a o c- C/) s ) , v m c 0 5. o -' co N a) * w CD o o n v < ° cc o D CD o 3 m .< -o a) 0 3 co a, c '3; m v 0 rn 3. c 'O N 0 M CO N n CD v O R. ,O. CD O' '0 3_ 0 j N a, ti 0 vA cQ CD 0 3 co c o o- -o CD cr O D D o c ° c c a, ° 1i o a-, O \ x N O O CD O coi (n (D N N (n O co 3 O o N CD -. D 0 2co 0_ a c5)' 0 0 0 o' CO CD O 01 iii 0 o g 3 CD m 0 O 0 = ? 3O o -0 11111114,4131 z (n .< c o * 3 (D c n' o m m 3 o 0 0 ..-.Z (v m m co m -I Z Z Z C -< Z Z -< -< -< -< C '-< Z 0 0 -< Z -< Z Z Z Z -< C C C C C C C -< -< -< C Z z m DDDND N DOm qm m 2 N A D �y n n 0m D N D D D o o m m N N n m D m CD ND D .o c 0 C ,. Irn �< 0(O CL 0 1) m y j X o r2) D v o c Q c o cDn OO v -n Z 2 o 0 0 2 cn x - x s ro n w D °1 N N N m O m (CA CD ,0» N 7 "0 p A 3 °) 3 'O C) •O o N V F Z CD 0 7 co O II a .� UNi a N CD C < _? A -,T, co 3 3 o m 0 0 <' m 3 n0i cD . '0 o co m 3 0 m m a v_, v 5. a- co oD CD (Q 'O n 0. "O O y N CU 0 CD O CD o N o y co -. .0 D co W co co y) m m o D m Sr c N = c a - o < p 3 0 o D m o co CD o 0 ii °) = 3 p ° o m (D °) CO N (S n k a O 0) SU 0 co W O CD CD 0 • co * -0 d D cD cu v, O n o m o m (n 0- n°) m o cn CU ma co 0 co 7 CD = CI 0 CWi1 7x(" 3 00_ B CO'I N O CU o co 0) c co (A O. co- o j n A O ( a (n -o a c o) 5 °) `<t0 , "O CU O N N p) j c O CO m a 5 d N 0 N CD m mm u3 oo v B a x 0 a *o ° - co * 3 N -CD00 CU 0 (0 7 CD CD n co A 0 0 oZ m 5. o N O -0 7: CD CCo 3 ca cn co A 3 C N CU C CD 0_• ] _0 0 p cra -a co . 3 0 a- =< Q c m .< o * - c 0 = co O cn m F 0 * m (v m Er o a a N ° m tv a - -o' No 7 0 n) p m C -0O Co O. (n 0 Cu 0 c O rel LI Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Technical Report Title Date Client: North Slope Borough Field: Walakpa Gas Field Rig: Kuukpik 5 Date: March 4, 2012 LMWD and Directional Drilling End of Well Report Walakpa 11 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA End of Well Report DIRECTIONAL DRILLERS Driller 1 :Mark Brouillet Driller 3 : Driller 2 :Art Morgan Driller 4 : JOB OBJECTIVES Objectives Per Wellplan: Walakpa #11 is planned as a high-angle, infill gas production well east of Walakpa #3, south of Walakpa #5, north of Walakpa #6, and west of recently drilled gas producer Walakpa #12. This location is in the mid-section of the Walakpa Gas Field. The production hole is planned for 1,500 feet. The well will be drilled west from the pad, south of parallel 2D seismic line 89-22 and will cross two perpendicular seismic lines running N-S, 89-59 and 89-79. Also, three development wells in the area provide structural controls throughout the well trajectory, Walakpa #3(6600’ offset), Walakpa #5 (3000’ offset), and Walakpa #6(5100’ offset). Walakpa #11has a planned offset of 4800’ from TD to TD points. Directional Objectives: 1. No Safety or Enviromental violations, No Accidents or Injuries. 2. Drill the Walakpa 11 well under days and under budget. 3. Keep wellbore tortuosity low. 4. Apply lessons learned from previous Barrow gas field wells to Walakpa 11. 5. Apply new directional plan and make improvements as needed to lower dogleg rates. JOB SUMMARY Walakpa 11 Directional summary: This well was drilled with many improvements to the directional plan. Lessons learned had been moved forward from the past 3 Barrow gas field’s wells drilled and applied to the Walakpa 11 well. Surface section was drilled with low doglegs and in a fashion that aided in reducing dogleg rates and slide percentage in the intermediate section. Both surface and intermediate went very well and the rig was well ahead of the days vs. depth curve at this point. The surface casing was run and cemented with good cement returns to surface and the plug bumped. Intermediate section was drilled below the 5° dogleg rate proposed in the directional plan. Slide percentage for the intermediate was at 27% which is the lowest slide percentage of any of the Barrow wells drilled this season. At the end of the intermediate section there was no doubt that wellbore tortuosity had been kept very low and good weight transfer would be available to run a motor in the horizontal section upcoming in the production hole. Problems were seen almost immediately after drilling out of the 7" casing with the motor BHA. Up to this point the Barrow gas wells production sections had all been drilled with the geo-pilot rotary steerable system. The motor assembly started out with far lower then expected rates of penetration this was surprising and expected to improve once the BHA reached the Walakpa sands. The BHA did get into the sands but an accumulation of hours would soon be the demise of the BHA as the bit had to be pulled due to hrs. This was an unplanned trip and turn around time for the BHA was lengthy with neutron density tools in the MWD package and downloading all logging data at surface etc. With a new BHA in the sands rates of penetration were far better but still not optimal. The new BHA was well on its way to drilling the section to TD when it exited out of the bottom of the pay zone. Several options were discussed with the decision made to attempt an open hole sidetrack. This may not have been the best option as the rig had a scheduled BOP test to begin within 24 hrs. The assembly was pulled back to 4,325' and troughed to 4,360'. Time drilling was initiated at this depth with no success time drilling continued and at 4,370' the assembly was time drilling with a 150° right toolface setting in an area which previously had a 10' slide at 15° left. This was a good area to sidetrack but the attempt was not successful. Due to time constraints concerning the BOP test the attempt was ended and the assembly used to clean out to the 4,708' MD Page 1 of 7 JOB SUMMARY where the well was officially called TD. Many BHA suggestions are to be presented to the customer in an attempt to further improve drilling on the last 2 remaining wells. A lot of very good things were done on the Walakpa 11 well and further improvements will be made by the directional team on location and in town. BHA SUMMARY BHA # 1 (Run 100) This BHA was a simple motor dumb iron assembly tasked to drill sufficient rathole to enable picking up the steerable motor assembly with MWD all the way to the jars. It Tagged cement at 48' and drilled to a depth of 221' it was then pulled from the hole for BHA # 2. The bit and motor were run on BHA # 2 BHA # 2 (Run 200) This BHA met all objectives set forth. Drilling hrs were kept low as the BHA performed very well. Wellbore placement was beneficial in reducing dogleg rates in the 8-1/2" intermediate section. No NPT time was encountered. Motor output was good from the beginning with motor yielding a strong 6.5° dogleg capability kicking the well off of vertical. The motor capability averaged 10.6° once above 7° inclination. No steering issues with the bit and motor combination. All tools inspected on surface with no visual damage. BHA # 3 (Run 300) The BHA used a re-run PDC Bit and also re-ran the 6-3/4" Sperrydrill motor used on the Walakpa 12 intermediate section. Both bit and motor performed as expected. The bit was easily steered and motor output was consistent throughout the interval. Bit and motor coupled with good MWD detection at all times while sliding made it very easy to build the required angle. BHA performance was as predicted and it was very easy to drill the section to TD. As with the surface BHA no damage was found to any of the BHA components when examined on surface. Specific information pertaining to bit or motor can be found in this report under each components heading. The intermediate section total footage was only 2,218' and inclination had to be built from 30° to a projected 81° at TD in this short distance. This was done with dogleg rates averaging 3° per 100' far lower then the 5° per 100' in the directional plan. This section also had a tangent section of roughly 800' which required only 1 slide for azimuth correction. Considering all this the assembly performance would have to be considered excellent by any standard. BHA # 4 (Run 400) BHA had slow ROP with 34% of the footage drilled not in the Walakpa sands. This percentage of footage was due to the assembly having to drop 39' in TVD before intersecting the Walakpa sand. Once in zone ROP did improve. With a large amount of time accumulated on the bit the BHA had to be pulled as the bit was run for 47.04 hours which according to the HDBS rep was over the upper threshold limit for the bit. The assembly drilled a total of 849'. ROP average for this BHA was a dismal 18 fph. BHA # 5 (Run 500) This is the same basic BHA as BHA # 4 with the exception of a new bit and dropping out the non mag spacing collar and the ILS stabilizer. The assembly did use a new 4-3/4" motor as motor was changed as a precaution due to the hours accumulated on the ABI Battery. BHA drilled from 4,275' to 4,708 (TD) The assembly showed noted ROP improvement at 41' per hour. The assembly was being control drilled as far as ROP for logging quality. This BHA did reach ROP over 100 fph in the sand. The BHA went out of zone due to a formation dip change and the well was brought to TD with the BHA only drilling 433' Bit # BHA CHART Run #Motor #Hole Size MD In MD Out TVD In TVD Out Inc In Inc Out Azi In Azi Out Time Drilling Time Circ (in) (ft) (ft) (ft) (ft) (deg) (deg) (deg) (deg) (hr) (hr) 0100 1RR 1 12.25 103.00 221.00 103.00 220.97 0.63 2.13 285.82 256.64 3.67 0.50 0200 1RR 2 12.25 221.00 1208.00 220.97 1160.32 2.13 30.95 256.64 259.82 18.37 11.34 0300 2 3 8.5 1208.00 3426.00 1160.32 2259.96 30.95 77.35 259.82 261.20 19.57 26.78 0400 3 4 6.13 3426.00 4275.00 2259.96 2327.44 77.35 84.29 261.20 256.06 47.04 9.15 0500 4 5 6.13 4275.00 4708.00 2327.44 2358.88 84.29 85.32 256.06 250.16 10.70 10.40 Page 2 of 7 MOTOR RUN SUMMARY 8" SperryDrill Lobe 4/5 - 5.3 stg W/ adjustable bend set at 1.5° was used in BHA # 1-2. Motor performance was good. Flow rate average of 535 gpm with BHA # 2 was not taxing the motor in any way. This motor delivered good dogleg rates averaging 10.6° even with a low flow rate and minimal 10k bit weight. Max bit weight during this run was 23k. The motor was not worked hard and delivered good over all performance. With no visible damage when inspected at surface. 6 3/4" SperryDrill Lobe 6/7 - 5.0 stg W/adj bend set at 1.5° used in BHA 3 (Run 300) Motor output averaged close to 8.5° per 100' which with the PDC bit should be considered good output. The motor was achieving 12.5° per 100' output towards the end of the run with higher angle in the hole. This motor was re-reun from the Walakpa 12 well. Motor easily drilled the section with no motor stalls and good performance throughout the interval. Motor was flushed with water and drained at surface. No visible damage was observed the motor lower sleeve stabilizer was packed heavily with clay. 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI 1.5° bend setting .30 rev/gal. Slow speed motor selected to be paired with the HDBS QH1R milltooth bit. Strong directional control was expected with this motor. At bit inclination was critical for keeping the assembly on path per geology's instructions. Motor performance was good even though ROP rates were very low. The low ROP rates are more associated with drilling 34% of this motors total footage in the shale formation above the pay zone. This motor was run on BHA # 4 and the assembly was tripped due to high bit hours. As a precautionary move only a new 4-3/4 slow speed motor was picked up with BHA # 5 the ROP improved due to drilling in the paysands. Both motor run performed well. The at bit inclination had excellent detection levels throughout both runs. Motor # MOTOR CHART Manufacturer Model Lobe OD Gauge Bend DLS (Ori)ROP (Ori) ROP (Rot) (in) (in) (deg) (°/100') (fph) (fph) Sperry Drilling SperryDrill 4:5 8 12.19 1.50 0.00 0.00 32.1531 Sperry Drilling SperryDrill 4:5 8 12.19 1.50 2.70 50.625 55.5182 Sperry Drilling SperryDrill 6:7 6.75 1.50 2.50 122.176 110.4483 Sperry Drilling SperryDrill 7:8 4.75 6 1.50 3.50 9.387 31.1734 Sperry Drilling SperryDrill 7:8 4.75 6 1.50 0.00 14.865 61.1115 BIT RUN SUMMARY Bit # 1 - BHA 1 (Run 100) and BHA 2 (Run 200) 12-1/4" surface bit run was a re-run HDBS Model QHC1GRC Milltooth jetted with 3 x 16 and 1 x 12. Bit footage = 1,105' this run. Bit now has an accumulated 2,216' of drilled footage.' Bit graded 1-1 WT-A-E-I-NO-TD Bit # 2 - BHA # 3 (Run 300) 8-1/2" HDBS FX2526 PDC jetted 5 X 13 TFA = .6481 Bit has now been used for 3 intermediate section on the Barrow gas field development project. Total accumulated footage is 6,759' with an accumulated 69.23 total drilling hrs. Footage for this run = 2,218' Drilling hrs this run 19.57 Bit Graded 1-1-WT-A-X-I-NO-TD Bit # 3 BHA # 4 (Run 400) 6-1/8" HDBS QH1R Milltooth bit Jetted 3 X 13 TFA .3889 Total footage 849' Bit graded 1-2-WT-A-E-1-CT-HR Bit # 4 - BHA # 5 (Run 400) 6-1/8" HDBS QH1R Milltooth bit Jetted 3 X 13 TFA .3889 Total footage 433' Bit graded 1-1-WT-A-E-I-NO-TD Bit # BIT CHART Manufacturer Style Gauge Gauge Length Nozzles TFA Dull Grades Footage Time Drilling ROP (in) (in) (in2) I O D L B G O R (ft) (hr) (fph) HDBS 622394 12.25 0.5 3x16,1x12 0.70 118.00 3.67 32.151RR HDBS 622394 12.25 0.5 3x16,1x12 0.70 1-1-WT-A-I-E-NO-TD 987.00 18.37 53.731RR Page 3 of 7 Bit # BIT CHART Manufacturer Style Gauge Gauge Length Nozzles TFA Dull Grades Footage Time Drilling ROP (in) (in) (in2) I O D L B G O R (ft) (hr) (fph) HDBS FX2526 8.5 3 5x13 0.65 1-1-WT-A-X-I-NO-TD 2218.00 19.57 113.342 HDBS QH1R 6.13 4 3x13 0.39 1-2-WT-A-E-1-CT-HR 849.00 47.04 18.053 HDBS QH1R 6.13 4 3x13 0.39 1-1-WT-A-E-I-NO-TD 433.00 10.70 40.474 Page 4 of 7 HOURS BY OPERATION HOURS PER RUN DAY vs DEPTH (f t ) (Days) FOOTAGE PER RUN (f t ) AVERAGE ROP PER RUN (f p h ) Page 5 of 7 SURFACE HOLE SECTION 12-1/4" Surface hole Drilled from bottom of conductor at 103' with RKB included to 1,208'. Surface was drilled with no hole problems. Flow rate adjusted so shakers could handle the clays coming across them. Rig did stop once to circulate when the BHA exited the base of the perma frost and a heavy load of cuttings brought to surface. Directionally the section went very well. Dogleg rates were kept low assembly landed at casing point high of plan to benefit intermediate section. Strong motor performance with the adjustable bend setting of 1.5° delivering 10.6 ° average dogleg capability. With the hole circulated clean the BHA was tripped to the flex drill collars. Some tight spots were worked through during this trip. Assembly was then run back to bottom and the wellbore given a final circulation prior to pulling out of the hole and laying down BHA. Casing was run to bottom with no hole problems seen. Cement job went well with cement to surface and the plug bumped. INTERMEDIATE HOLE SECTION 1 12-1/4" Surface hole Drilled from bottom of conductor at 103' with RKB included to 1,208'. Surface was drilled with no hole problems. Flow rate adjusted so shakers could handle the clays coming across them. Rig did stop once to circulate when the BHA exited the base of the perma frost and a heavy load of cuttings brought to surface. Directionally the section went very well. Dogleg rates were kept low assembly landed at casing point high of plan to benefit intermediate section. Strong motor performance with the adjustable bend setting of 1.5° delivering 10.6 ° average dogleg capability. With the hole circulated clean the BHA was tripped to the flex drill collars. Some tight spots were worked through during this trip. Assembly was then run back to bottom and the wellbore given a final circulation prior to pulling out of the hole and laying down BHA. Casing was run to bottom with no hole problems seen. Cement job went well with cement to surface and the plug bumped. 8-1/2" Intermediate section drilled from 1,208' to 3,426' with the HDBS FX2526 PDC and 6 3/4" SperryDrill Lobe 6/7 - 5.0 stg W/adj bend set at 1.5° was done with no directional difficulties. Heavy clays on this section were expected as the clay has been prevalent in all the barrow gas field wells. The clay made it necessary to keep flow rates averaging around 450 gpm while drilling the section. The lower flow rates and soap additives to the mud system made it possible for the shakers to keep up with the cuttings. The assembly was able to drill longer portions of footage before stopping to circulate the hole clean. Drilling hrs and slide percentage were lower on this section then had been seen in the previous wells. Dogleg rates were kept well below the 5° per 100' planned rate due to directional changes and adjustments made in the field. Once the section was brought to TD a short trip was done. The original plan was to pull to the surface shoe on elevators. This was not done due to swabbing. The assembly was backreamed to the surface casing shoe. On the way back in the hole it was also necessary to ream some sections. Once back on bottom while circulating the hole clean heavy clay's packed the flow line. Circulation continued until 510 - 520 gpm was reached and could be maintained. With the shakers showing very few cuttings across the screens the assembly was hoisted with no swabbing. On surface BHA tools were packed with clay and the bit was severely balled up. The 7" casing run went well with no problems getting casing to bottom. The cement job was also uneventful with the plug being bumped. This section was drilled in a timely manner with good wellbore positioning for the upcoming production section. INTERMEDIATE HOLE SECTION 2 PRODUCTION HOLE SECTION 6-1/8" Production was not drilled to the planned depth. The 7" casing was set at the depth given by geology. BHA was picked up used to drill out of the casing shoe building angle to be landed in the payzone at 88°. The Walakpa sands came in lower then prognosis. The 7" casing shoe set at 3,415' MD and the Walakpa sands were not intersected until 3,718' MD. Once in the payzone the directive from geology was to hold inclination at 87° to 88°. At the depth of 4,485' MD instructions were to lower inclination to 85.5° - 87.0°. These instructions changed at 4,518' MD with new inclination to be held at 84° this was to allow the wellpath to drop lower in section and once in the middle of the payzone the plan was to hold dip angle until TD. Unfortunately there was an apparent dip change with dip going from 87° to a flat horizontal position with no dip. This caused the wellpath to be steered out of zone and into the lower Kingak formation. TD for the section was called at 4,708' over 500' of pay sand had been acquired. Page 6 of 7 AK - X X - 0 0 0 8 3 7 0 3 4 5 No r t h S l o p e B o r o u g h Wa l a k p a 1 1 Ku u k p i k 5 Walakpa Gas Field MD (f t ) Fo r m a t i o n N a m e MD / T V D ( f t ) In c l i n a t i o n ( d e g ) DL S ( ° / 1 0 0 ' ) Bi t D a t a D r i l l i n g Pa r a m e t e r s Mo t o r B H A St a b i l i z e r s Co m m e n t s R u n # @ MD (ft) In c DL S 0 2 5 5 0 7 5 1 0 0 02 4 6 8 62 2 3 9 4 3x 1 6 , 1 x 1 2 32 . 1 5 f p h 3. 6 7 h r 62 2 3 9 4 3x 1 6 , 1 x 1 2 53 . 7 3 f p h 18 . 3 7 h r FX 2 5 2 6 5x 1 3 11 3 . 3 4 f p h 19 . 5 7 h r QH 1 R 3x 1 3 18 . 0 5 f p h 47 . 0 4 h r QH 1 R 3x 1 3 40 . 4 7 f p h 10 . 7 h r WO B 5 k l b RP M 4 0 FL O 5 1 0 g p m SP P 6 7 0 p s i g WO B 1 8 k l b RP M 6 4 . 3 8 FL O 5 3 6 . 3 9 g p m SP P 1 2 7 8 . 5 8 p s i g WO B 9 . 6 8 k l b RP M 7 8 FL O 4 5 6 . 3 5 g p m SP P 1 4 7 2 . 7 p s i g WO B 1 3 . 7 1 k l b RP M 6 3 . 0 8 FL O 2 0 0 g p m SP P 1 3 2 1 . 2 2 p s i g WO B 1 7 . 7 7 k l b RP M 0 FL O 2 0 0 g p m SP P 1 4 3 3 . 1 8 p s i g 8" S p e r r y D r i l l 4/ 5 1. 5 d e g 8" S p e r r y D r i l l 4/ 5 1. 5 d e g 6. 7 5 " S p e r r y D r i l l 6/ 7 1. 5 d e g 4. 7 5 " S p e r r y D r i l l 7/ 8 1. 5 d e g 4. 7 5 " S p e r r y D r i l l 7/ 8 1. 5 d e g 8. 3 8 i n @ 9 0 . 2 1 f t 5. 9 4 i n @ 5 2 . 2 3 f t Se n s o r d i s t a n c e s : D i r e c t i o n a l 3 9 . 7 1 ' / G a m m a 4 8 . 3 5 ' / R e s 5 6 . 0 4 ' Se n s o r D i s t a n c e ; R e s = 4 8 . 7 8 ' G a m m a = 4 1 . 0 4 ' . P W D = 6 0 . 9 6 ' , D D S r = 65 . 6 9 ' , D i r e c t i o n = 7 5 . 3 2 ' | F l o a t C o l l a r = 1 1 1 0 . 5 7 ' M D , F l o a t S h o e = 11 9 3 . 4 2 ' M D Se n s o r D i s t a n c e s A B I = 1 0 . 7 1 ' , S W R O = 6 3 . 1 1 ' , R E S = 6 3 . 6 1 ' , Ga m m a = 7 0 . 6 7 ' , D D S r = 7 3 . 5 1 ' , D i r = 8 1 . 9 0 ' , AL D = 9 1 . 4 2 ' , C T N = 1 0 6 . 2 0 ' , P W D = 1 1 7 . 9 1 ' | C a s i n g F l o a t c o l l a r = 3 , 3 2 8 ' / Ca s i n g s h o e = 3 , 4 1 5 ' / R F O = 2 4 6 . 0 7 ° Se n s o r D i s t a n c e s A B I = 1 0 . 6 2 ' , S W R O = 5 2 . 4 4 ' , R E S = 5 2 . 9 4 ' , G a m m a = 60 ' , D D S r = 6 2 . 8 4 ' , D i r = 7 1 . 1 4 ' , A L D = 8 0 . 6 6 ' , C T N = 9 5 . 4 4 ' , P W D = 10 7 . 1 5 | 4 3 / 4 " S p e r r y D r i l l L o b e 7 / 8 - 2 . 9 stgW/ABI / Motor SN # 475-998 / Ad j B e n d s e t t i n g 1 . 5 ° / R e v / G a l . 3 0 | B i t = H D B S Q H 1 R M i l l t o o t h J e t t e d 3 X 1 3 / T F A = . 3 8 8 9 | C a s i n g F l o a t c o l l a r = 3 , 3 2 8 ' / C a s i n g s h o e = 3 , 4 1 5 ' / RF O = 2 1 . 3 1 ° #100 @ 103.0 #200 @ 221.0 #300 @ 1208.0 #400 @ 3426.0 #500 @ 4275.0 23 . 0 0 22 3 . 0 0 42 3 . 0 0 62 3 . 0 0 82 3 . 0 0 10 2 3 . 0 0 12 2 3 . 0 0 14 2 3 . 0 0 16 2 3 . 0 0 18 2 3 . 0 0 20 2 3 . 0 0 22 2 3 . 0 0 24 2 3 . 0 0 26 2 3 . 0 0 28 2 3 . 0 0 30 2 3 . 0 0 32 2 3 . 0 0 34 2 3 . 0 0 36 2 3 . 0 0 38 2 3 . 0 0 40 2 3 . 0 0 42 2 3 . 0 0 44 2 3 . 0 0 46 2 3 . 0 0 48 2 3 . 0 0 50 2 3 . 0 0 Pe r m a f r o s t Wa l a k p a S a n d s Wa l a k p a S a n d s Wa l a k p a S a n d s Ba r r o w Ku u k p i k 5 AK - M J - 0 0 0 8 3 7 0 3 4 5 MD (f t ) In c (d e g ) Az m (d e g ) TV D (f t ) Ve r t i c a l Se c t i o n (f t ) DL S (° / 1 0 0 ' ) Bu i l d (° / 1 0 0 ' ) Tu r n (° / 1 0 0 ' ) MD Fr o m (f t ) MD To (f t ) Dr i l l i n g Mo d e TF O (d e g ) GP De f l (% ) Ro t a r y RP M WO B (K L B S ) Fl o w Ra t e (g p m ) RO P (f p h ) Dh o l e Te m p (° ) To r q u e ( f t / l b s ) SP P Of f - BT M (p s i ) SP P On - BT M (p s i ) Pi c k - U p We i g h t ( l b s ) Sl a c k - Of f We i g h t ( l b s ) Ro t a t e On - B t m We i g h t ( l b s ) Comments 14 3 . 0 0 0 . 7 8 2 8 0 . 5 8 1 4 3 . 0 0 0 . 8 7 0 . 0 0 0 . 0 0 0 . 0 0 1 0 3 1 6 3 R o t a t e 4 0 5 5 1 0 4 8 6 4 0 6 7 0 3 8 3 8 3 8 D r i l l o u t B H A / N o M W D 16 8 . 1 0 0 . 7 5 2 6 8 . 7 7 1 6 8 . 0 9 1 . 1 8 0 . 6 4 - 0 . 1 2 - 4 7 . 0 5 1 6 3 2 2 1 R o t a t e 4 0 5 5 1 0 2 4 6 4 0 6 7 0 D i s p l a c e w a t e r T / S p u d M u d 22 1 2 3 5 S l i d e 2 5 5 ° M 1 0 4 6 0 3 5 6 5 7 7 1 5 25 7 . 1 1 3 . 0 9 2 5 4 . 6 4 2 5 7 . 0 5 4 . 1 5 2 . 6 6 2 . 6 3 - 1 5 . 8 7 23 5 2 6 5 S l i d e 2 5 5 ° M 1 0 4 6 3 6 0 7 1 5 7 8 0 26 5 2 9 7 R o t a t e 4 0 1 0 4 6 3 4 4 1 0 0 0 7 1 0 7 6 7 4 2 4 1 4 2 31 9 . 2 4 4 . 7 6 2 5 4 . 4 3 3 1 9 . 0 3 8 . 4 0 2 . 6 9 2 . 6 9 - 0 . 3 4 29 7 3 2 7 S l i d e 0 ° G 1 2 4 5 3 6 0 7 1 0 7 2 6 32 7 3 6 0 R o t a t e 4 0 1 2 4 6 0 5 0 1 0 0 0 7 5 0 7 6 8 4 2 4 1 4 2 36 0 3 7 5 S l i d e 0 ° G 1 2 4 6 4 3 9 7 7 5 8 0 0 38 1 . 0 0 6 . 5 1 2 5 1 . 5 1 3 8 0 . 4 9 1 4 . 4 6 2 . 8 7 2 . 8 3 - 4 . 7 3 3 7 5 4 2 1 R o t a t e 4 0 1 3 4 6 5 4 4 1 0 0 0 7 3 6 7 5 0 4 2 4 1 4 2 44 2 . 6 5 7 . 0 8 2 5 0 . 5 0 4 4 1 . 7 1 2 1 . 7 3 0 . 9 4 0 . 9 2 - 1 . 6 4 4 2 1 4 8 3 R o t a t e 7 0 1 8 4 7 5 5 2 8 7 5 9 4 0 50 4 . 5 9 8 . 4 4 2 5 3 . 0 5 5 0 3 . 0 8 3 0 . 0 8 2 . 2 6 2 . 2 0 4 . 1 2 48 3 5 0 5 S l i d e 3 5 ° G 2 0 4 7 5 5 1 7 7 5 8 0 0 50 5 5 4 5 R o t a t e 7 0 1 7 4 7 5 6 5 8 7 5 9 4 0 56 6 . 7 9 1 0 . 6 6 2 5 6 . 8 1 5 6 4 . 4 1 4 0 . 3 9 3 . 7 1 3 . 5 7 6 . 0 5 54 5 5 7 5 S l i d e 0 ° G 2 3 5 7 5 5 3 1 2 6 0 1 4 0 0 57 5 6 0 7 R o t a t e 7 0 1 5 4 7 5 4 9 1 2 6 0 1 4 2 0 4 6 4 6 4 7 62 7 . 6 7 1 3 . 1 8 2 5 7 . 4 3 6 2 3 . 9 7 5 2 . 9 6 4 . 1 4 4 . 1 4 1 . 0 2 60 7 6 3 2 S l i d e 0 ° G 2 3 5 7 5 5 6 1 2 6 0 1 3 8 0 63 2 6 6 8 R o t a t e 7 0 1 5 5 7 5 8 0 1 2 6 0 1 4 4 0 66 8 6 8 0 S l i d e 0 ° G 2 3 5 7 5 8 0 1 2 6 0 1 4 7 0 68 8 . 2 1 1 5 . 2 3 2 5 8 . 2 3 6 8 2 . 6 6 6 7 . 8 0 3 . 4 0 3 . 3 9 1 . 3 2 6 8 0 7 2 9 R o t a t e 7 0 1 5 5 7 5 7 4 1 2 6 0 1 3 4 0 72 9 7 5 0 S l i d e 2 0 ° G 2 3 5 7 5 4 9 1 2 6 0 1 4 0 0 75 2 . 1 6 1 6 . 5 9 2 5 7 . 6 3 7 4 4 . 1 6 8 5 . 3 1 2 . 1 4 2 . 1 3 - 0 . 9 4 7 5 0 7 9 3 R o t a t e 7 0 1 5 5 7 5 4 9 1 3 0 0 1 5 1 0 81 6 . 0 2 1 7 . 3 7 2 5 6 . 6 9 8 0 5 . 2 3 1 0 3 . 9 4 1 . 2 9 1 . 2 2 - 1 . 4 7 7 9 3 8 5 6 R o t a t e 7 0 1 5 5 7 5 9 2 1 3 0 0 1 5 1 0 87 8 . 1 7 1 9 . 6 9 2 5 6 . 1 0 8 6 4 . 1 6 1 2 3 . 6 9 3 . 7 5 3 . 7 3 - 0 . 9 5 85 6 8 8 5 S l i d e 0 ° G 2 3 5 7 5 1 1 8 1 2 6 0 1 4 0 0 88 5 9 2 0 R o t a t e 7 0 2 2 5 7 5 6 7 1 3 0 0 1 5 1 0 93 9 . 0 1 2 2 . 7 5 2 5 6 . 7 9 9 2 0 . 8 7 1 4 5 . 7 0 5 . 0 5 5 . 0 3 1 . 1 3 92 0 9 5 0 S l i d e 2 0 ° G 2 3 5 7 5 5 0 1 2 6 0 1 4 0 0 95 0 9 8 3 R o t a t e 7 0 2 0 5 7 5 5 2 1 3 0 0 1 5 1 0 98 3 1 0 0 0 S l i d e 2 3 ° G 2 0 5 7 5 4 9 1 5 0 0 1 6 2 0 10 0 6 . 0 2 2 4 . 8 7 2 5 7 . 8 8 9 8 2 . 1 7 1 7 2 . 7 3 3 . 2 3 3 . 1 6 1 . 6 3 1 0 0 0 1 0 4 6 R o t a t e 7 0 2 0 5 7 5 5 4 1 6 5 0 1 5 0 0 1 6 2 0 5 2 5 1 5 2 P u m p H i - V i s s w e e p 10 4 6 1 0 6 8 S l i d e 2 5 ° G 2 3 5 7 5 8 8 1 5 0 0 1 6 2 0 10 7 1 . 4 0 2 7 . 5 2 2 5 9 . 0 5 1 0 4 0 . 8 3 2 0 1 . 5 4 4 . 1 3 4 . 0 5 1 . 7 9 1 0 6 8 1 1 0 1 R o t a t e 7 0 2 0 5 7 5 6 0 1 6 5 0 1 5 0 0 1 6 2 0 5 2 5 1 5 2 P u m p H i - V i s s w e e p , 4 5 b b l H i - V i s 11 0 1 1 1 1 0 R o t a t e 7 0 2 0 5 7 5 5 0 1 6 5 0 1 5 0 0 1 6 2 0 5 2 5 1 5 2 11 3 3 . 0 3 2 8 . 5 3 2 5 9 . 8 6 1 0 9 5 . 2 3 2 3 0 . 4 1 1 . 7 5 1 . 6 4 1 . 3 1 1 1 1 0 1 1 6 5 R o t a t e 7 0 2 0 5 7 5 4 4 1 6 5 0 1 5 0 0 1 6 2 0 5 2 5 1 5 2 11 6 7 . 2 3 3 0 . 6 3 2 5 9 . 4 4 1 1 2 4 . 9 7 2 4 7 . 2 4 6 . 1 7 6 . 1 4 - 1 . 2 3 11 6 5 1 1 7 3 S l i d e - 1 5 ° G 2 3 5 7 5 2 1 1 5 0 0 1 6 2 0 11 7 3 1 2 0 8 S l i d e - 1 0 ° G 2 3 5 7 5 3 4 1 5 0 0 1 6 2 0 5 2 5 0 5 1 T D @ 1 2 0 8 ' M D / 12 0 8 1 2 1 2 R o t a t e 4 0 5 4 0 0 6 0 8 0 0 8 5 0 12 1 2 1 2 2 8 R o t a t e 4 0 5 4 0 0 7 4 8 0 0 8 5 0 L O T 12 3 8 . 6 5 3 1 . 9 4 2 5 9 . 8 0 1 1 8 6 . 0 1 2 8 4 . 2 2 1 . 8 5 1 . 8 3 0 . 5 0 1 2 2 8 1 2 4 8 R o t a t e 8 0 1 2 4 0 0 1 0 9 8 0 0 8 5 0 5 1 4 6 4 8 12 4 8 1 2 7 0 S l i d e 0 ° G 1 2 4 0 0 1 2 0 8 0 0 1 0 0 0 6 . 8 9 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 13 0 2 . 8 7 3 3 . 4 5 2 6 0 . 1 0 1 2 4 0 . 0 5 3 1 8 . 7 9 2 . 3 6 2 . 3 5 0 . 4 7 1 2 7 0 1 3 1 4 R o t a t e 8 0 1 2 4 5 0 1 0 6 1 2 7 3 1 3 7 5 13 1 4 1 3 4 0 S l i d e 0 ° G 1 2 4 5 0 1 5 6 1 3 0 0 1 4 0 0 7 . 9 8 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 13 6 5 . 2 0 3 5 . 3 6 2 6 1 . 5 4 1 2 9 1 . 4 8 3 5 3 . 8 3 3 . 3 3 3 . 0 6 2 . 3 1 1 3 4 0 1 3 7 9 R o t a t e 8 0 1 2 4 5 0 1 2 3 1 3 0 0 1 4 0 0 13 7 9 1 4 0 7 S l i d e 0 ° G 1 2 4 5 0 1 2 9 1 2 5 0 1 3 7 5 7 . 8 0 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 14 2 7 . 7 4 3 7 . 5 3 2 6 1 . 1 8 1 3 4 1 . 7 8 3 9 0 . 7 6 3 . 4 9 3 . 4 7 - 0 . 5 8 1 4 0 7 1 4 4 1 R o t a t e 8 0 1 2 4 5 0 1 2 0 1 2 5 0 1 3 7 5 14 4 1 1 4 7 0 S l i d e - 2 0 ° G 1 2 4 5 0 1 5 8 1 2 0 0 1 3 2 5 8 . 1 7 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 14 9 2 . 4 6 3 9 . 6 7 2 5 9 . 5 5 1 3 9 2 . 3 6 4 3 0 . 9 7 3 . 6 6 3 . 3 1 - 2 . 5 2 1 4 7 0 1 5 0 5 R o t a t e 8 0 1 2 4 5 0 1 3 1 1 2 0 0 1 3 2 5 15 0 5 1 5 3 3 S l i d e - 2 0 ° G 1 2 4 5 0 1 4 0 1 0 0 0 1 1 5 0 7 . 8 5 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d Op e r a t o r : We l l : Fi e l d : Lo c a t i o n : Ri g : Jo b # : PR A Wa l a k p a 1 1 Ba r r o w G a s F i e l d Da t e : 3 / 2 / 2 0 1 2 Page: 1 of 4 MD (f t ) In c (d e g ) Az m (d e g ) TV D (f t ) Ve r t i c a l Se c t i o n (f t ) DL S (° / 1 0 0 ' ) Bu i l d (° / 1 0 0 ' ) Tu r n (° / 1 0 0 ' ) MD Fr o m (f t ) MD To (f t ) Dr i l l i n g Mo d e TF O (d e g ) GP De f l (% ) Ro t a r y RP M WO B (K L B S ) Fl o w Ra t e (g p m ) RO P (f p h ) Dh o l e Te m p (° ) To r q u e ( f t / l b s ) SP P Of f - BT M (p s i ) SP P On - BT M (p s i ) Pi c k - U p We i g h t ( l b s ) Sl a c k - Of f We i g h t ( l b s ) Ro t a t e On - B t m We i g h t ( l b s ) Comments 15 5 6 . 1 8 4 1 . 5 1 2 5 7 . 7 0 1 4 4 0 . 7 5 4 7 2 . 3 5 3 . 4 5 2 . 8 9 - 2 . 9 0 1 5 3 3 1 5 5 8 R o t a t e 8 0 1 2 4 5 0 1 3 6 1 0 0 0 1 2 0 0 15 5 8 1 5 6 8 R o t a t e 8 0 1 2 4 5 0 7 5 1 1 3 0 1 3 5 0 15 6 8 1 5 9 5 S l i d e - 1 0 ° G 1 2 4 5 0 1 6 2 1 1 3 0 1 3 5 0 7 . 1 0 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 16 1 7 . 5 1 4 3 . 3 8 2 5 7 . 0 6 1 4 8 6 . 0 0 5 1 3 . 7 0 3 . 1 3 3 . 0 5 - 1 . 0 4 1 5 9 5 1 6 3 3 R o t a t e 8 0 1 2 4 5 0 1 1 4 1 2 5 0 1 3 5 0 16 3 3 1 6 5 5 S l i d e 0 ° G 1 2 4 5 0 1 6 9 1 2 5 0 1 3 7 5 8 . 4 9 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 16 8 2 . 1 4 4 5 . 1 9 2 5 6 . 4 1 1 5 3 2 . 2 7 5 5 8 . 8 1 2 . 8 9 2 . 8 0 - 1 . 0 1 1 6 5 5 1 6 9 6 R o t a t e 8 0 1 2 4 5 0 1 2 4 1 3 0 0 1 4 0 0 16 9 6 1 7 2 6 S l i d e 5 ° G 1 0 4 5 0 1 3 0 1 3 5 0 1 4 5 0 8 . 9 5 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 17 4 5 . 8 1 4 7 . 8 1 2 5 7 . 2 4 1 5 7 6 . 0 9 6 0 4 . 9 7 4 . 2 2 4 . 1 1 1 . 3 0 1 7 2 6 1 7 5 8 R o t a t e 8 0 1 0 4 5 0 1 3 9 1 3 5 0 1 4 5 0 17 5 8 1 7 8 6 S l i d e 1 0 ° G 1 0 4 5 0 1 1 2 1 3 5 0 1 4 5 0 8 . 6 7 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 18 0 8 . 8 7 5 0 . 2 3 2 5 7 . 4 4 1 6 1 7 . 4 4 6 5 2 . 5 4 3 . 8 5 3 . 8 4 0 . 3 2 1 7 8 6 1 8 2 2 R o t a t e 8 0 1 0 4 5 0 1 1 3 1 3 5 0 1 4 5 0 18 2 2 1 8 4 3 S l i d e - 5 ° G 1 0 4 5 0 1 4 0 1 3 5 0 1 4 5 0 9 . 3 7 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 18 7 3 . 0 2 5 2 . 2 0 2 5 7 . 4 7 1 6 5 7 . 6 3 7 0 2 . 5 0 3 . 0 7 3 . 0 7 0 . 0 5 1 8 4 3 1 8 8 5 R o t a t e 8 0 1 0 4 5 0 1 4 0 1 3 5 0 1 4 5 0 18 8 5 1 9 1 4 S l i d e - 1 0 ° G 1 0 4 5 0 1 4 5 1 3 5 0 1 4 5 0 1 0 . 1 3 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 19 3 6 . 4 8 5 5 . 0 7 2 5 6 . 6 9 1 6 9 5 . 2 5 7 5 3 . 5 7 4 . 6 3 4 . 5 2 - 1 . 2 3 1 9 1 4 1 9 4 9 R o t a t e 8 0 1 0 4 5 0 1 2 5 2 7 0 0 1 3 5 0 1 4 5 0 5 1 4 7 4 9 19 4 9 1 9 7 3 S l i d e - 1 0 ° G 1 0 4 5 0 1 6 0 1 3 5 0 1 4 5 0 9 . 7 2 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 19 9 9 . 0 4 5 7 . 3 5 2 5 6 . 1 0 1 7 3 0 . 0 4 8 0 5 . 5 5 3 . 7 3 3 . 6 4 - 0 . 9 4 1 9 7 3 2 0 1 3 R o t a t e 8 0 1 0 4 5 0 1 2 9 1 3 5 0 1 4 5 0 20 1 3 2 0 3 7 S l i d e 0 ° G 1 0 4 5 0 9 2 1 3 5 0 1 4 5 0 7 . 6 4 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 20 6 1 . 2 0 5 9 . 0 9 2 5 6 . 7 7 1 7 6 2 . 7 8 8 5 8 . 3 7 2 . 9 5 2 . 8 0 1 . 0 8 2 0 3 7 2 0 7 6 R o t a t e 8 0 1 0 4 5 0 1 3 0 1 3 5 0 1 4 5 0 20 7 6 2 1 0 6 S l i d e 1 5 ° G 1 0 4 5 0 9 6 1 3 5 0 1 4 5 0 8 . 4 7 ° M / O 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 21 2 4 . 9 1 6 1 . 6 3 2 5 6 . 9 5 1 7 9 4 . 2 8 9 1 3 . 7 2 3 . 9 9 3 . 9 9 0 . 2 8 2 1 0 6 2 1 3 8 R o t a t e 8 0 1 0 4 5 0 1 0 6 2 7 0 0 1 3 5 0 1 4 5 0 5 1 4 7 4 9 R e a m T w i c e f o r E C D ' s & S h a k e r s 21 3 8 2 1 6 6 S l i d e 0 ° G 1 0 4 5 0 1 5 5 1 3 5 0 1 4 5 0 9 . 5 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 21 8 9 . 6 4 6 4 . 2 9 2 5 7 . 0 0 1 8 2 3 . 7 1 9 7 1 . 3 4 4 . 1 1 4 . 1 1 0 . 0 8 2 1 6 6 2 2 0 2 R o t a t e 8 0 1 0 4 5 0 1 1 4 1 3 5 0 1 4 5 0 22 0 2 2 2 3 0 S l i d e 0 ° G 1 0 4 5 0 1 0 7 1 3 5 0 1 4 5 0 1 0 . 9 9 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 22 5 1 . 7 0 6 7 . 1 2 2 5 8 . 3 3 1 8 4 9 . 2 4 1 0 2 7 . 8 4 4 . 9 6 4 . 5 6 2 . 1 4 2 2 3 0 2 2 6 5 R o t a t e 8 0 1 0 4 5 0 1 2 5 1 3 5 0 1 4 5 0 22 6 5 2 2 8 5 S l i d e 3 0 ° G 1 0 4 5 0 1 0 9 1 3 5 0 1 4 5 0 9 . 3 1 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 23 1 4 . 6 1 6 8 . 9 7 2 5 8 . 5 8 1 8 7 2 . 7 6 1 0 8 6 . 0 9 2 . 9 6 2 . 9 4 0 . 4 0 2 2 8 5 2 3 2 8 R o t a t e 8 0 7 4 8 0 8 3 1 6 2 0 1 7 3 0 T a n g e n t S e c t i o n 23 2 8 2 3 4 4 R o t a t e 8 0 7 4 8 0 8 0 1 6 1 0 1 7 4 0 23 7 9 . 1 2 6 8 . 9 2 2 5 8 . 2 5 1 8 9 5 . 9 3 1 1 4 6 . 1 9 0 . 4 8 - 0 . 0 8 - 0 . 5 1 2 3 4 4 2 3 9 2 R o t a t e 8 0 7 4 8 0 5 9 1 6 2 0 1 7 0 0 24 4 2 . 7 0 6 8 . 7 7 2 5 7 . 9 6 1 9 1 8 . 8 8 1 2 0 5 . 4 1 0 . 4 9 - 0 . 2 4 - 0 . 4 6 2 3 9 2 2 4 5 4 R o t a t e 8 0 7 4 8 0 8 3 1 6 2 0 1 7 0 0 25 0 5 . 9 8 6 8 . 5 2 2 5 7 . 7 4 1 9 4 1 . 9 2 1 2 6 4 . 2 8 0 . 5 1 - 0 . 4 0 - 0 . 3 5 2 4 5 4 2 5 1 8 R o t a t e 8 0 7 4 8 0 1 1 3 1 6 5 0 1 7 1 0 5 4 4 5 4 8 25 7 0 . 0 1 6 8 . 7 5 2 5 7 . 4 2 1 9 6 5 . 2 5 1 3 2 3 . 8 6 0 . 5 9 0 . 3 6 - 0 . 5 0 2 5 1 8 2 5 8 2 R o t a t e 8 0 7 4 8 0 9 4 1 6 5 0 1 7 1 0 26 3 1 . 4 8 6 9 . 0 2 2 5 7 . 3 1 1 9 8 7 . 3 9 1 3 8 1 . 1 6 0 . 4 7 0 . 4 4 - 0 . 1 8 2 5 8 2 2 6 4 4 R o t a t e 8 0 7 4 8 0 1 1 0 1 6 5 0 1 7 1 0 26 9 4 . 8 9 6 8 . 8 4 2 5 7 . 2 8 2 0 1 0 . 1 9 1 4 4 0 . 2 9 0 . 2 9 - 0 . 2 8 - 0 . 0 5 2 6 4 4 2 7 0 8 R o t a t e 8 0 7 4 8 0 1 2 8 1 6 5 0 1 7 1 0 27 5 9 . 1 6 6 8 . 7 8 2 5 7 . 1 3 2 0 3 3 . 4 2 1 5 0 0 . 1 7 0 . 2 4 - 0 . 0 9 - 0 . 2 3 2 7 0 8 2 7 7 1 R o t a t e 8 0 7 4 8 0 6 2 1 6 5 0 1 7 1 0 28 2 2 . 1 2 6 8 . 3 7 2 5 6 . 3 5 2 0 5 6 . 4 2 1 5 5 8 . 7 6 1 . 3 2 - 0 . 6 5 - 1 . 2 4 2 7 7 1 2 8 3 5 R o t a t e 8 0 7 4 8 0 1 1 6 1 6 5 0 1 7 1 0 28 8 5 . 2 3 6 8 . 0 7 2 5 6 . 2 5 2 0 7 9 . 8 4 1 6 1 7 . 3 5 0 . 5 0 - 0 . 4 8 - 0 . 1 6 2 8 3 5 2 8 9 9 R o t a t e 8 0 7 4 8 0 9 6 1 6 5 0 1 7 1 0 29 4 9 . 9 8 6 7 . 9 1 2 5 6 . 1 4 2 1 0 4 . 1 0 1 6 7 7 . 3 7 0 . 2 9 - 0 . 2 5 - 0 . 1 7 2 8 9 9 2 9 6 1 R o t a t e 8 0 7 4 8 0 1 1 6 1 6 5 0 1 7 1 0 29 6 1 2 9 8 1 S l i d e 8 0 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 5 . 3 1 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 30 1 2 . 8 3 6 8 . 3 3 2 5 7 . 1 9 2 1 2 7 . 5 2 1 7 3 5 . 6 8 1 . 6 9 0 . 6 7 1 . 6 7 2 9 8 1 3 0 2 6 R o t a t e 8 0 7 4 8 0 1 2 5 1 6 5 0 1 7 1 0 30 7 6 . 0 3 6 8 . 0 7 2 5 6 . 9 1 2 1 5 1 . 0 0 1 7 9 4 . 3 2 0 . 5 8 - 0 . 4 1 - 0 . 4 4 3 0 2 6 3 0 8 9 R o t a t e 8 0 7 4 8 0 1 4 6 1 6 5 0 1 7 1 0 31 4 0 . 4 7 6 7 . 9 2 2 5 7 . 0 4 2 1 7 5 . 1 4 1 8 5 4 . 0 4 0 . 3 0 - 0 . 2 3 0 . 2 0 3 0 8 9 3 1 5 2 R o t a t e 8 0 7 4 8 0 1 4 0 1 6 5 0 1 7 1 0 31 5 2 3 1 7 7 S l i d e 3 5 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 6 . 2 3 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 32 0 2 . 5 6 6 9 . 4 6 2 5 7 . 3 1 2 1 9 7 . 7 0 1 9 1 1 . 8 5 2 . 5 1 2 . 4 8 0 . 4 3 3 1 7 7 3 2 1 6 R o t a t e 8 0 7 4 8 0 1 5 6 1 6 5 0 1 7 1 0 32 1 6 3 2 3 4 R o t a t e 8 0 7 4 8 0 1 5 6 1 6 5 0 1 7 1 0 32 3 4 3 2 5 9 S l i d e 3 0 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 1 1 . 6 8 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 32 6 4 . 3 1 7 2 . 0 1 2 5 8 . 8 2 2 2 1 8 . 0 8 1 9 7 0 . 0 6 4 . 7 3 4 . 1 3 2 . 4 5 3 2 5 9 3 2 7 9 R o t a t e 8 0 7 4 8 0 1 5 6 1 6 5 0 1 7 1 0 32 7 9 3 3 1 0 S l i d e 3 0 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 1 1 . 7 4 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 33 2 8 . 9 8 7 5 . 0 9 2 6 0 . 8 4 2 2 3 6 . 3 9 2 0 3 1 . 8 6 5 . 6 3 4 . 7 6 3 . 1 2 3 3 1 0 3 3 4 1 R o t a t e 8 0 7 4 8 0 1 5 6 1 6 5 0 1 7 1 0 33 5 0 . 7 3 7 6 . 3 1 2 6 1 . 1 0 2 2 4 1 . 7 6 2 0 5 2 . 8 3 5 . 7 3 5 . 6 1 1 . 2 0 33 4 1 3 3 6 5 S l i d e 2 5 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 1 2 . 4 6 ° M o t o r O u t p u t 6 - 3 / 4 " M o t o r 1 . 5 ° b e n d 33 6 5 3 4 0 6 R o t a t e 8 0 7 4 8 0 1 5 6 3 0 0 0 1 6 5 0 1 7 1 0 5 7 4 1 4 7 Da t e : 3 / 2 / 2 0 1 2 Page: 2 of 4 MD (f t ) In c (d e g ) Az m (d e g ) TV D (f t ) Ve r t i c a l Se c t i o n (f t ) DL S (° / 1 0 0 ' ) Bu i l d (° / 1 0 0 ' ) Tu r n (° / 1 0 0 ' ) MD Fr o m (f t ) MD To (f t ) Dr i l l i n g Mo d e TF O (d e g ) GP De f l (% ) Ro t a r y RP M WO B (K L B S ) Fl o w Ra t e (g p m ) RO P (f p h ) Dh o l e Te m p (° ) To r q u e ( f t / l b s ) SP P Of f - BT M (p s i ) SP P On - BT M (p s i ) Pi c k - U p We i g h t ( l b s ) Sl a c k - Of f We i g h t ( l b s ) Ro t a t e On - B t m We i g h t ( l b s ) Comments 34 0 6 3 4 2 6 S l i d e 0 ° G 1 3 4 5 0 1 0 0 1 3 5 0 1 4 5 0 T D R e a c h e d @ 0 4 ; 1 9 A M 3 4 2 6 ' M D 34 4 2 . 8 1 7 7 . 7 4 2 6 1 . 2 6 2 2 6 2 . 4 4 2 1 4 2 . 0 6 1 . 5 6 1 . 5 5 0 . 1 7 3 4 2 6 3 4 4 6 R o t a t e 3 5 6 2 0 0 1 0 1 0 6 0 1 1 0 0 D r i l l 2 0 ' N e w H o l e 34 4 6 3 4 6 3 R o t a t e 3 5 6 2 0 0 8 1 0 6 0 1 1 0 0 6 2 4 4 5 0 34 6 3 3 4 8 0 R o t a t e 3 5 6 2 0 0 2 7 1 0 6 0 1 1 0 0 34 8 0 3 4 9 5 S l i d e - 2 0 ° G 6 2 0 0 5 1 0 6 0 1 1 0 0 4 3 / 4 " S p e r r y D r i l l L o b e 7 / 8 - 2 . 9 s t g W / A B I 34 9 5 3 5 0 5 R o t a t e 3 5 6 2 0 0 3 8 1 0 6 0 1 1 0 0 35 0 5 . 0 4 7 9 . 5 7 2 6 2 . 4 1 2 2 7 4 . 6 8 2 2 0 2 . 6 6 3 . 4 5 2 . 9 4 1 . 8 5 35 0 5 3 5 2 1 S l i d e - 1 0 ° G 6 2 0 0 1 6 1 0 6 0 1 1 0 0 35 2 1 3 5 2 5 R o t a t e 5 0 6 2 0 0 6 6 1 0 6 0 1 1 0 0 35 2 5 3 5 4 0 S l i d e - 1 0 ° G 1 5 2 0 0 1 1 1 0 6 0 1 1 0 0 35 4 0 3 5 5 7 S l i d e - 3 0 ° G 1 5 2 0 0 1 0 1 0 6 0 1 1 0 0 35 6 6 . 8 7 8 3 . 6 3 2 6 0 . 8 5 2 2 8 3 . 7 1 2 2 6 3 . 4 2 7 . 0 2 6 . 5 7 - 2 . 5 2 3 5 5 7 3 5 8 7 R o t a t e 6 0 1 5 2 0 0 4 4 1 1 0 0 1 3 8 0 6 8 3 6 5 1 35 8 7 3 6 0 0 S l i d e - 5 0 ° G 1 5 2 0 0 1 7 1 0 6 0 1 1 0 0 36 0 0 3 6 1 9 S l i d e - 3 0 ° G 1 5 2 0 0 1 3 1 0 6 0 1 1 0 0 36 2 9 . 3 5 8 5 . 7 4 2 5 8 . 0 1 2 2 8 9 . 5 0 2 3 2 5 . 4 5 5 . 6 5 3 . 3 8 - 4 . 5 5 3 6 1 9 3 6 4 9 R o t a t e 6 0 1 5 2 0 0 3 5 1 1 0 0 1 3 8 0 36 4 9 3 6 7 5 R o t a t e 7 0 1 5 2 0 0 4 5 1 1 0 0 1 3 8 0 36 9 0 . 2 4 8 6 . 7 9 2 5 6 . 7 8 2 2 9 3 . 4 6 2 3 8 6 . 1 6 2 . 6 5 1 . 7 2 - 2 . 0 2 36 7 5 3 7 0 0 S l i d e - 3 0 ° G 1 5 2 0 0 1 3 1 1 0 0 1 3 6 0 37 0 0 3 7 1 1 R o t a t e 7 0 1 5 2 0 0 4 4 1 1 6 0 1 4 1 0 37 5 2 . 3 3 8 6 . 2 3 2 5 7 . 0 1 2 2 9 7 . 2 4 2 4 4 8 . 1 1 0 . 9 7 - 0 . 9 0 0 . 3 7 3 7 1 1 3 7 7 3 R o t a t e 7 0 1 5 2 0 0 5 0 1 1 6 0 1 4 1 0 37 7 3 3 7 9 4 S l i d e - 1 5 ° G 1 5 2 0 0 8 1 1 0 0 1 3 6 0 37 9 4 3 7 9 5 S l i d e - 1 5 ° G 1 5 2 0 0 4 1 1 0 0 1 3 6 0 37 9 5 3 8 0 7 S l i d e - 1 5 ° G 1 5 2 0 0 8 1 1 0 0 1 3 6 0 38 1 3 . 7 0 8 9 . 3 9 2 5 5 . 7 4 2 2 9 9 . 5 9 2 5 0 9 . 4 1 5 . 5 5 5 . 1 5 - 2 . 0 7 3 8 0 7 3 8 3 4 R o t a t e 7 0 1 5 2 0 0 7 5 1 1 6 0 1 4 1 0 38 7 5 . 1 9 8 7 . 7 8 2 5 6 . 3 6 2 3 0 1 . 1 1 2 5 7 0 . 8 7 2 . 8 1 - 2 . 6 2 1 . 0 1 3 8 3 4 3 8 8 7 R o t a t e 7 0 1 5 2 0 0 6 3 1 1 6 0 1 4 1 0 38 8 7 3 8 9 1 S l i d e - 1 5 ° G 1 5 2 0 0 2 2 1 1 0 0 1 3 6 0 38 9 1 3 8 9 6 S l i d e 0 ° G 1 5 2 0 0 1 0 1 1 0 0 1 3 6 0 38 9 6 3 9 1 0 S l i d e 0 ° G 1 5 2 0 0 8 1 1 0 0 1 3 6 0 39 1 6 . 8 9 9 0 . 4 3 2 5 5 . 1 1 2 3 0 1 . 7 6 2 6 1 2 . 5 6 7 . 0 3 6 . 3 5 - 3 . 0 0 39 1 0 3 9 1 7 S l i d e 0 ° G 1 5 2 0 0 7 1 1 0 0 1 3 6 0 39 1 7 3 9 3 3 R o t a t e 7 0 1 5 2 0 0 2 3 1 1 6 0 1 4 1 0 39 3 3 3 9 3 4 S l i d e 1 8 0 ° G 1 5 2 0 0 2 1 1 0 0 1 3 6 0 39 3 4 3 9 3 8 R o t a t e 7 0 1 5 2 0 0 1 3 1 1 6 0 1 4 1 0 39 3 9 . 9 3 9 0 . 1 9 2 5 5 . 0 5 2 3 0 1 . 6 3 2 6 3 5 . 6 0 1 . 0 7 - 1 . 0 4 - 0 . 2 6 39 3 8 3 9 4 8 S l i d e 1 8 0 ° G 1 5 2 0 0 7 1 1 0 0 1 3 6 0 39 4 8 3 9 5 8 R o t a t e 7 0 1 5 2 0 0 1 4 1 1 6 0 1 4 1 0 39 5 8 3 9 6 2 R o t a t e 7 0 1 5 2 0 0 1 6 1 1 6 0 1 4 1 0 39 6 2 3 9 7 1 S l i d e - 1 5 0 ° G 1 5 2 0 0 8 1 1 0 0 1 3 6 0 39 7 1 4 0 0 0 R o t a t e 7 0 1 5 2 0 0 2 6 1 1 6 0 1 4 1 0 40 0 2 . 3 8 8 8 . 3 9 2 5 4 . 0 7 2 3 0 2 . 4 1 2 6 9 8 . 0 4 3 . 2 8 - 2 . 8 8 - 1 . 5 7 40 0 0 4 0 1 1 S l i d e - 1 6 0 ° G 1 5 2 0 0 5 1 1 0 0 1 3 6 0 40 1 1 4 0 2 1 R o t a t e 7 0 1 5 2 0 0 2 2 1 1 6 0 1 4 1 0 40 2 1 4 0 4 5 R o t a t e 7 0 1 5 2 0 0 3 4 1 1 6 0 1 4 1 0 40 4 5 4 0 5 8 S l i d e - 1 6 0 ° G 1 5 2 0 0 1 3 1 1 0 0 1 3 6 0 40 5 8 4 0 6 5 R o t a t e 7 0 1 5 2 0 0 4 1 1 1 6 0 1 4 1 0 40 6 5 . 4 4 8 6 . 1 7 2 5 4 . 4 6 2 3 0 5 . 4 0 2 7 6 1 . 0 2 3 . 5 7 - 3 . 5 2 0 . 6 2 40 6 5 4 0 7 1 S l i d e - 5 ° G 1 5 2 0 0 1 0 1 1 0 0 1 3 6 0 40 7 1 4 0 8 5 R o t a t e 7 0 1 5 2 0 0 4 2 1 1 6 0 1 4 1 0 40 8 5 4 1 1 0 R o t a t e 7 0 1 5 2 0 0 3 3 1 1 6 0 1 4 1 0 41 2 8 . 1 6 8 3 . 8 8 2 5 5 . 4 5 2 3 1 0 . 8 4 2 8 2 3 . 5 0 3 . 9 8 - 3 . 6 5 1 . 5 8 41 1 0 4 1 3 1 S l i d e 1 7 0 ° G 1 5 2 0 0 9 1 1 0 0 1 3 6 0 41 3 1 4 1 4 8 R o t a t e 7 0 1 5 2 0 0 3 7 1 1 6 0 1 4 1 0 41 4 8 4 1 5 3 S l i d e 0 ° G 1 5 2 0 0 1 5 1 1 0 0 1 3 6 0 41 5 3 4 1 8 8 R o t a t e 7 0 1 5 2 0 0 3 5 1 1 6 0 1 4 1 0 6 0 3 0 3 8 41 9 2 . 6 4 8 4 . 0 0 2 5 5 . 2 2 2 3 1 7 . 6 4 2 8 8 7 . 6 2 0 . 4 0 0 . 1 9 - 0 . 3 6 41 8 8 4 1 9 4 S l i d e 0 ° G 1 5 2 0 0 1 5 1 1 0 0 1 3 6 0 41 9 4 4 2 1 1 R o t a t e 7 0 1 5 2 0 0 2 8 1 1 6 0 1 4 1 0 42 5 0 . 7 4 8 3 . 8 8 2 5 5 . 8 2 2 3 2 3 . 7 8 2 9 4 5 . 3 9 1 . 0 5 - 0 . 2 1 1 . 0 3 4 2 1 1 4 2 7 5 R o t a t e 7 0 1 5 2 0 0 3 9 1 1 6 0 1 4 1 0 Da t e : 3 / 2 / 2 0 1 2 Page: 3 of 4 MD (f t ) In c (d e g ) Az m (d e g ) TV D (f t ) Ve r t i c a l Se c t i o n (f t ) DL S (° / 1 0 0 ' ) Bu i l d (° / 1 0 0 ' ) Tu r n (° / 1 0 0 ' ) MD Fr o m (f t ) MD To (f t ) Dr i l l i n g Mo d e TF O (d e g ) GP De f l (% ) Ro t a r y RP M WO B (K L B S ) Fl o w Ra t e (g p m ) RO P (f p h ) Dh o l e Te m p (° ) To r q u e ( f t / l b s ) SP P Of f - BT M (p s i ) SP P On - BT M (p s i ) Pi c k - U p We i g h t ( l b s ) Sl a c k - Of f We i g h t ( l b s ) Ro t a t e On - B t m We i g h t ( l b s ) Comments 42 7 5 4 2 8 6 S l i d e 0 ° G 1 5 2 0 0 2 0 1 1 0 0 1 2 5 0 6 4 4 0 5 6 43 1 7 . 7 6 8 5 . 0 2 2 5 6 . 4 9 2 3 3 0 . 2 6 3 0 1 2 . 0 8 1 . 9 7 1 . 7 0 1 . 0 0 4 2 8 6 4 3 2 6 R o t a t e 1 6 2 0 0 7 5 1 1 0 0 1 2 5 0 6 4 4 0 5 6 43 2 6 4 3 7 0 R o t a t e 1 8 2 0 0 1 1 0 1 1 0 0 1 2 5 0 43 7 0 4 3 8 0 S l i d e - 1 5 ° G 1 8 2 0 0 1 3 1 1 0 0 1 3 5 0 43 8 2 . 3 8 8 5 . 9 4 2 5 6 . 1 0 2 3 3 5 . 3 5 3 0 7 6 . 4 9 1 . 5 5 1 . 4 2 - 0 . 6 0 4 3 8 0 4 3 9 0 R o t a t e 1 8 2 0 0 9 0 1 2 0 0 1 3 5 0 6 6 3 8 5 6 43 9 0 4 4 2 9 R o t a t e 1 8 2 0 0 9 7 1 2 0 0 1 3 5 0 6 6 3 8 5 6 44 2 9 4 4 4 1 S l i d e - 4 5 ° G 1 8 2 0 0 1 4 1 2 2 5 1 3 5 0 44 4 4 . 2 0 8 7 . 1 8 2 5 3 . 9 1 2 3 3 9 . 0 6 3 1 3 8 . 1 9 4 . 0 7 2 . 0 1 - 3 . 5 4 4 4 4 1 4 4 5 5 R o t a t e 1 8 2 0 0 8 7 1 2 2 5 1 3 7 5 6 6 3 8 5 6 44 5 5 4 4 7 3 R o t a t e 1 8 2 0 0 2 3 1 2 5 0 1 3 7 5 6 6 3 8 5 6 44 7 3 4 4 7 5 S l i d e - 4 5 ° G 1 8 2 0 0 5 1 2 5 0 1 4 0 0 44 7 5 4 4 9 3 R o t a t e 1 8 2 0 0 3 0 1 3 0 0 1 4 0 0 6 6 3 8 5 6 44 9 3 4 5 0 0 S l i d e - 3 0 ° G 1 8 2 0 0 1 1 1 3 0 0 1 5 3 0 45 0 9 . 0 1 8 6 . 3 7 2 5 2 . 0 7 2 3 4 2 . 7 1 3 2 0 2 . 8 5 3 . 1 0 - 1 . 2 5 - 2 . 8 4 4 5 0 0 4 5 1 8 R o t a t e 1 8 2 0 0 6 4 1 4 5 0 1 5 3 0 6 6 3 8 5 6 45 7 1 . 1 0 8 5 . 9 4 2 5 3 . 0 5 2 3 4 6 . 8 7 3 2 6 4 . 7 4 1 . 7 2 - 0 . 6 9 1 . 5 8 4 5 1 8 4 5 8 0 R o t a t e 1 8 2 0 0 6 5 1 4 5 0 1 5 3 0 6 6 3 8 5 6 45 8 0 4 5 8 8 S l i d e - 1 7 0 ° G 1 8 2 0 0 1 8 1 4 5 0 1 5 3 0 46 3 1 . 6 9 8 5 . 3 2 2 5 0 . 1 6 2 3 5 1 . 4 9 3 3 2 5 . 0 3 4 . 8 6 - 1 . 0 2 - 4 . 7 7 4 5 8 8 4 6 4 5 R o t a t e 1 8 2 0 0 5 2 1 4 5 0 1 5 3 0 46 4 5 4 6 5 3 S l i d e 0 ° G 1 8 2 0 0 1 5 1 4 5 0 1 5 3 0 46 5 3 4 6 6 6 R o t a t e 1 8 2 0 0 4 6 1 4 5 0 1 5 3 0 46 6 6 4 6 7 4 S l i d e 0 ° G 1 8 2 0 0 1 8 1 4 5 0 1 5 3 0 46 7 4 4 6 8 8 R o t a t e 1 8 2 0 0 5 3 1 4 5 0 1 5 3 0 46 8 8 4 6 9 3 S l i d e 0 ° G 1 8 2 0 0 1 6 1 4 5 0 1 5 3 0 47 0 8 . 0 0 8 5 . 3 2 2 5 0 . 1 6 2 3 5 7 . 7 2 3 4 0 0 . 7 9 0 . 0 0 0 . 0 0 0 . 0 0 4 6 9 3 4 7 0 8 R o t a t e 1 8 2 0 0 5 6 1 4 5 0 1 5 3 0 Da t e : 3 / 2 / 2 0 1 2 Page: 4 of 4 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA BHA Report IADC Rig BHA#1 Run#0100 Date In :02/15/2012 MD In (ft): 103 TVD In (ft): 103 Date Out :02/15/2012 MD Out (ft): 221 TVD Out (ft): 221 BIT DATA Bit Number :1RR Nozzles :3x16,1x12 Bit Size (in):12.250 TFA (in2):0.6995 Manufacturer :HDBS Dull Grade In :1-1-WT-A-I-E-NO-TD Model :622394 Dull Grade Out : Serial Number :11748526 MOTOR DATA Motor Number :Bend (deg):1.501 OD (in):8.000 Nozzles (32nd):0.0 Manufacturer :Sperry Drilling Avg Diff Press :30.00 Model :SperryDrill Cumul Cir Hrs :5.17 Serial Number :800456 Length (ft)Blade Bit - Center COMPONENT DATA (ft) Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(in)(lbpf) 1 QHC1GRC Milltooth 11748526 9.000 3.000 12.250 192.72 P 6-5/8" REG 1.01 2 8" SperryDrill Lobe 4/5 - 5.3 stg 800456 8.000 5.000 121.08 B 6-5/8" H90 30.68 Btm Sleeve Stabilizer 12.188 3.15 3 Float Sub 0888 8.062 3.250 145.70 B 6-5/8" H90 1.80 4 X-Over Sub 886 8.000 2.375 156.21 B 4-1/2" XH 2.60 5 X-Over Sub 2563 5.937 2.500 77.62 B 4" Mod 2.62 6 2 joints 4" XT-39 HWDP 4.000 2.563 29.70 61.94 7 2 Joints 4" XT-39 HWDP 4.000 2.563 29.70 61.95 8 2 Joints 4" XT-39 HWDP 4.000 2.563 29.70 61.95 Total:224.55 Page 1 PERFORMANCE Section A HoursParameter Min Max Avg Activity BHA Weight (klb) WOB (klb):555Drilling : in Air (Total) :10.303.67 RPM (rpm):40 40 40 Reaming :1.00 in Mud (Total) : Flow (gpm):510 510 510 Circ-Other :0.50 in Air (Bel Jars) : SPP (psig):670 670 670 Total :5.17 in Mud (Bel Jars) : BHA WEIGHT CALCULATION MESSAGE Jar not found. Could not calculate weight below jars. Mud Weight not valid could not calculate BHA weight in mud. PERFORMANCE Section B In Out Distance (ft)ROP (fph)Build (°/100')Turn (°/100')DLS (°/100') (deg)0.63 2.13 Oriented :0 n/a n/a 0.00Inclination (deg)285.82 256.64 Rotating :118 32 0.00 0.00 0.00Azimuth Total :118 32 1.28 0.00 1.37 COMMENTS OBJECTIVES BHA 1 (Run 100) Objectives for this BHA are extremely simple and uncomplicated. The assembly will be used to drill enough open hole to pick up the steerable motor assembly with MWD, Flex collars and jars. The conductor when cemented U-tubed with the cement coming up the conductor to within 48' of surface. The BHA will consist of bit, motor, float sub and 2 crossovers for a length of38.71'. With RKB being 23' on Kuupik 5 this will put the BHA 15' down into the conductor. Plan will be to drill down 3 stands of 4" HWDP to a total depth of 221' with 3' stick up. The cement will be drilled out with water and once the depth of 103' has been reached and the assembly is drilling formation it will be displaced to the spud mud. With the assembly reaching 221' it will allow for picking up the remaining BHA components to the jars with 16' of rathole in case of any hole sloughing. Once reaching the desired depth a quick circulation to make sure the hole is clean will be done. This BHA will then be hoisted to surface and BHA # 2 will be picked up. RESULTS BHA 1 (Run 100) Results for BHA were as expected. BHA drilled to 221' with no difficulty. ROP was far lower then expected. Bit weight was held to an average of 5k with rotary speed set at 40 rpm through out the run. This was done as the assembly was used to drill out cement in the conductor and there was no reason to rotate faster so close to the surface conductor. The assembly was picked up and tagged cement at 48'. Cement was drilled out and once new formation was showing at the shakers the water used to drill out cement was displaced with the spud mud. Bit weight set at 5k due to no drill collars and minimal BHA weight. Stacking more weight on the bit would be detrimental in holding this short drilling footage vertical. Once the 221' depth had been reached a short circulation was done and the assembly tripped to surface. The 3 stands of HWDP were racked back in the derrick and the crossovers broke off the top of the motor. The bit was pulled above the table cleaned and inspected. The bit was not broke off the motor as it would be re-run in BHA # 2 RECOMMENDATIONS No recommendations are needed for the assembly. Basic BHA used to drill a very small amount of footage. OTHER Page 2 BHA Schematic North Slope Borough Walakpa 11 IADC Rig BHA # : 1 Run # : 100 Drillstring : Drillstring OD COMPONENT DATA (in)(ft) Length Description QHC1GRC Milltooth (Gauge: 12.250 in)9.000 1.01 8" SperryDrill Lobe 4/5 - 5.3 stg8.000 30.68 Btm Sleeve Stabilizer (Gauge: 12.188 in, Pos*: 2.14 ft) Float Sub8.062 1.80 X-Over Sub8.000 2.60 X-Over Sub5.937 2.62 2 joints 4" XT-39 HWDP4.000 61.94 2 Joints 4" XT-39 HWDP4.000 61.95 2 Joints 4" XT-39 HWDP4.000 61.95 *Pos: Measured as distance from bottom of the component. Page 1 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA Motor Performance Report SUMMARY Depth In/Out (ft):103.00 /221.00BHA Number :1 Date In/Out :02/15/2012 /02/15/2012Run Number :0100 Hole Size (in):12.25Bit Number :1RR DFB (ft) Component Yes/No Type Value Gauge 12.19 in3.15 Sleeve Stab Yes Sleeve 1.50° bend8.16 Bent Housing Yes Adjustable Bent Housing Pad No 31.69 Motor Top Yes Lower String Stab No Upper String Stab No MOTOR CONFIGURATION MOTOR PARAMETERS Serial Number :800456 Lobe Config :4:5 Motor Run #:1 Stat Elastomer :Nitrile OD (in):8 ID (in):5 Short Brg Pack :Yes Flex Collar Used :Yes Arr Ret Rotor Nozzle (32nd):0.0 Pick Up Sub :Yes No Bit Box Protr :Yes No MOTOR RUN DATA Directional Driller(s):Mark Brouillet,Art Morgan Application Details :Steerable Drilling Max Dogleg While Rotating :0.00(°/100') RPM :45.00 Motor Stalled :No Max Dogleg Overpulled In (°/100'):0.00 Force (klb):0.00 Float Valve :Yes Max Dogleg Pushed Through (°/100'):0.00 Force (klb):0.00 DP Filter :No Page 1 Inc Start/End (deg):0.628 /2.133 Interval Oriented / Rot. (ft):0.00 /118.00 Hole Azimuth Start / End (deg):285.823 /256.641 Directional Perf Ori / Rot (°/100'):0.00 /0.00 Jarring Occurred :No HOURS Existing Hrs :0.00 Circ Hrs :0.50 Total Hrs This Run :5.17 Drilling Hrs :3.67 Reaming Hrs :1.00 New Cumulative Hrs :5.17 DRILLING DATA Diff Press RPM Rotn Torque Drag Up/Down WOB ROP Oriented ROP Rotated (psig) (ft-lb) (klb) (fph) (fph)(klb) Avg 30.00 40 0.00 38.00 /38.00 5.00 0 32 Max 30.00 40 0.00 38.00 /38.00 5.00 0 48 PRE-RUN TESTS Motor Tested Pre-Run :Yes with Bit/MWD :Yes / No Dump Sub Operating :No Brg Play : Flow 1 (gpm):400.00 Pressure 1 (psig):720.00 Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Bearing Leakage Observed :No POST-RUN TESTS Motor Tested Post-Run :Yes with Bit/MWD :Yes / No Dump Sub Operating :No Brg Play : Flow 1 (gpm):Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :Yes Fluid Flushed :Yes Bearing Leakage Observed :Yes Fluid Used :Water DriveShaft Rotated to Drain Mud :Yes MUD DATA Type :Mud Wt (ppg): Name :pH : % Oil / Water :/% Solid : DH Temp Avg / Max (degF):0.00 / 0.00 % Sand : SPP Start / End (gpm):670.00 / 670.00 PV (cP): Flow Rate Avg / Max (gpm):510.00 / 510.00 YP (lhf2): Chloride Content (ppm): Lithology :Permafrost Principal Formation Name(s):Permafrost Page 2 BIT DATA Bit Number :1RR Nozzles :3x16,1x12 Bit Size (in):12.250 TFA (in2):0.6995 Manufacturer :HDBS Gauge Length :0.500(in) Model :622394 Dull Grade In :1-1-WT-A-I-E-NO-TD Serial Number :11748526 Dull Grade Out : Existing Bit Hrs :0.00 Existing Ream Hrs :0.00 Cum Drilling Hrs :3.67 Cum Ream Hrs :1.00 PERFORMANCE Service Interrupt :No Trip For Failure :No LIH :No Service Interrupt Hrs :0.00 Problem Date :01/17/2012 COMMENTS No MWD in string doglegs could not be identified due to no surveys Page 3 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA BHA Report IADC Rig BHA#2 Run#0200 Date In :02/15/2012 MD In (ft): 221 TVD In (ft): 221 Date Out :02/17/2012 MD Out (ft): 1208 TVD Out (ft): 1160 BIT DATA Bit Number :1RR Nozzles :3x16,1x12 Bit Size (in):12.250 TFA (in2):0.6995 Manufacturer :HDBS Dull Grade In :1-1-WT-A-I-E-NO-BHA Model :622394 Dull Grade Out :1-1-WT-A-I-E-NO-TD Serial Number :11748526 MOTOR DATA Motor Number :Bend (deg):1.502 OD (in):8.000 Nozzles (32nd):0.0 Manufacturer :Sperry Drilling Avg Diff Press :113.48 Model :SperryDrill Cumul Cir Hrs :34.88 Serial Number :800456 Length (ft)Blade Bit - Center COMPONENT DATA (ft) Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(in)(lbpf) 1 QHC1GRC Milltooth 11748526 9.000 3.000 12.250 192.72 P 6-5/8" REG 1.01 2 8" SperryDrill Lobe 4/5 - 5.3 stg 800456 8.000 5.000 121.08 B 6-5/8" H90 30.68 Btm Sleeve Stabilizer 12.188 3.15 3 Float Sub 0888 8.062 3.250 145.70 B 6-5/8" H90 1.80 4 X-Over Sub 0864 8.062 3.250 145.70 B 6-5/8" REG 2.00 5 8" DM Collar 11644620 8.000 3.500 147.40 B 6-5/8" REG 9.20 6 Gamma/Res/HCIM 309960 8.000 1.920 161.44 B 6-5/8" REG 23.48 7 8" HOC 11391241 8.150 4.000 145.20 B 6-5/8" H90 9.32 8 Orienting Sub UBHO 2615 7.875 2.875 149.18 B 6-5/8" H90 2.50 9 Flex Collar 10800551 7.812 2.813 142.17 B 6-5/8" H90 29.98 10 Flex Collar EQ11011567 8.062 3.312 144.61 B 6-5/8" H90 30.57 11 Flex Collar 118987225 7.785 3.250 133.95 B 6-5/8" H90 30.54 12 X-Over Sub 886 8.000 2.375 156.21 B 4-1/2" XH 2.60 13 Jar 1622-0445 6.120 2.750 80.01 B 4-1/2" XH 31.51 14 X-Over Sub 2563 5.937 2.500 77.62 B 4" Mod 2.62 Page 3 Length (ft)Blade Bit - Center COMPONENT DATA Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(lbpf) 15 17 joints 4" XT-39 HWDP 4.000 2.563 29.70 525.84 Total:733.65 PERFORMANCE Section A HoursParameter Min Max Avg Activity BHA Weight (klb) WOB (klb):10 23 18 Drilling : in Air (Total) :42.8618.37 RPM (rpm):40 70 64 Reaming :0.00 in Mud (Total) : Flow (gpm):453 575 536 Circ-Other :11.34 in Air (Bel Jars) :24.52 SPP (psig):715 1620 1279 Total :34.88 in Mud (Bel Jars) : BHA WEIGHT CALCULATION MESSAGE Mud Weight not valid could not calculate BHA weight in mud. PERFORMANCE Section B In Out Distance (ft)ROP (fph)Build (°/100')Turn (°/100')DLS (°/100') (deg)2.13 30.95 Oriented :340 51 n/a n/a 2.70Inclination (deg)256.64 259.82 Rotating :647 56 0.50 -0.25 0.50Azimuth Total :987 54 2.92 0.32 2.92 COMMENTS Sensor distances: Directional 39.71' / Gamma 48.35' / Res 56.04' OBJECTIVES BHA 2 (Run 200) Objectives for BHA- Drill from 221' to TD @ 1,188' (Projected) The assembly will start building with 2.5° doglegs graduating this rate up to 3° dogleg rates with no azimuth turn. Final inclination per directional plan will be 27.1°. Gyro will be run until magnetic interference is not seen on the MWD tools. The assembly will re-run the HDBS milltooth run on Walakpa 12 surface interval. This assembly is tasked with drilling the surface hole in one run. The objective will easily be achieved with this BHA. Motor bend setting will be 1.5° giving more then enough motor dogleg capability to acquire the directional profile requested. The Walakpa 12 well previously drilled made it necessary to change the directional plan for this well. Lessons learned on the previous well are to be implemented on the Walakpa 11 well. The directional plan was made with short notice and approved with full knowledge that changes to the plan would be carried out in the field. An attempt to set the wellbore high at casing point and lower the dogleg rates for the intermediate will be carried out. MWD logging package will include Gamma/Res with no onsite geologist will be present for the surface section. RESULTS BHA 2 (Run 200) results: Results for the BHA were very favorable. The assembly was made up and run in to 205' at this depth a gyro was run in the hole to orient the motor to highside at a 255° direction. The assembly was slid from 221' to 265' to kick the wellbore off vertical. The rotary was then engaged and the assembly rotated to 297'. At this depth a connection was made and a survey taken that showed the MWD directional tool was clear of any magnetic interference. The gyro was put on standby at this point. Motor output at the MWD survey depth of 257 showed a 6.57° dogleg capability. Fractional slide sets were made with motor output increasing as more angle was achieved. At 878' survey depth motor output was calculated at 10.59°. Motor dogleg capability average 10.63° from 878' to TD at 1,208' the assembly was comfortably ahead of plan and 3.5° ahead of planned inclination. The BHA had successfully drilled the surface interval with 34% slide percentage and 18.37 drilling Page 4 RESULTS hours. The objective of setting high and lowering the dogleg rate for the intermediate section was easily met. Dogleg rates for the intermediate section were lowered to a 3° rate down from the original Walakpa directional plan that had set this rate at 6°. The new directional plan had called for 5° rates in intermediate. This BHA is responsible for minimizing slide percentage in the upcoming 8-1/2" hole section. All objectives were met and no NPT time encountered with the BHA. Drilling statistics: Depth in 221' Depth out 1,208' Slide footage 340' Rotary footage 647' Slide percentage 34% Drilling hrs 18.37 Final inclination 30.63° Assembly set 45' high and .6 off of azimuth proposal line. RPM average 65 Average bit weight 10k Max bit weight 23k Average flow rate 535 gpm Average standpipe pressure 1,280 psi Motor used - 8" SperryDrill Lobe 4/5 - 5.3 stg adj bend setting 1.5° Bit used - HDBS QHC1GRC Milltooth Grade at surface 1-1-WT-A-I-E-NO-TD RECOMMENDATIONS No recommendations required or requested. BHA performance was excellent. OTHER Page 5 BHA Schematic North Slope Borough Walakpa 11 IADC Rig BHA # : 2 Run # : 200 Drillstring : Drillstring OD COMPONENT DATA (in)(ft) Length Description QHC1GRC Milltooth (Gauge: 12.250 in)9.000 1.01 8" SperryDrill Lobe 4/5 - 5.3 stg8.000 30.68 Btm Sleeve Stabilizer (Gauge: 12.188 in, Pos*: 2.14 ft) Float Sub8.062 1.80 X-Over Sub8.062 2.00 8" DM Collar8.000 9.20 Gamma/Res/HCIM8.000 23.48 8" HOC8.150 9.32 Orienting Sub UBHO7.875 2.50 Flex Collar7.812 29.98 Flex Collar8.062 30.57 Flex Collar7.785 30.54 X-Over Sub8.000 2.60 Jar6.120 31.51 X-Over Sub5.937 2.62 17 joints 4" XT-39 HWDP4.000 525.84 *Pos: Measured as distance from bottom of the component. Page 2 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA Motor Performance Report SUMMARY Depth In/Out (ft):221.00 /1208.00BHA Number :2 Date In/Out :02/15/2012 /02/17/2012Run Number :0200 Hole Size (in):12.25Bit Number :1RR DFB (ft) Component Yes/No Type Value Gauge 12.19 in3.15 Sleeve Stab Yes Sleeve 1.50° bend8.16 Bent Housing Yes Adjustable Bent Housing Pad No 31.69 Motor Top Yes Lower String Stab No Upper String Stab No MOTOR CONFIGURATION MOTOR PARAMETERS Serial Number :800456 Lobe Config :4:5 Motor Run #:2 Stat Elastomer :Nitrile OD (in):8 ID (in):5 Short Brg Pack :Yes Flex Collar Used :Yes Arr Ret Rotor Nozzle (32nd):0.0 Pick Up Sub :Yes No Bit Box Protr :Yes No MOTOR RUN DATA Directional Driller(s):Mark Brouillet,Art Morgan Application Details : Max Dogleg While Rotating :6.20(°/100') RPM :70.00 Motor Stalled :No Max Dogleg Overpulled In (°/100'):6.20 Force (klb):13.00 Float Valve :Yes Max Dogleg Pushed Through (°/100'):6.20 Force (klb):5.00 DP Filter :No Page 4 Inc Start/End (deg):2.133 /30.95 Interval Oriented / Rot. (ft):340.00 /647.00 Hole Azimuth Start / End (deg):256.641 /259.816 Directional Perf Ori / Rot (°/100'):2.70 /0.50 Jarring Occurred :No HOURS Existing Hrs :5.17 Circ Hrs :11.34 Total Hrs This Run :29.71 Drilling Hrs :18.37 Reaming Hrs :0.00 New Cumulative Hrs :34.88 DRILLING DATA Diff Press RPM Rotn Torque Drag Up/Down WOB ROP Oriented ROP Rotated (psig) (ft-lb) (klb) (fph) (fph)(klb) Avg 113.48 64 1371.43 48.00 /47.00 18.00 51 56 Max 120.00 70 1650.00 52.00 /51.00 23.00 118 92 PRE-RUN TESTS Motor Tested Pre-Run :Yes with Bit/MWD :Yes / No Dump Sub Operating :No Brg Play :2.00 Flow 1 (gpm):450.00 Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :Yes Bearing Leakage Observed :Yes POST-RUN TESTS Motor Tested Post-Run :Yes with Bit/MWD :Yes / No Dump Sub Operating :No Brg Play :4.00 Flow 1 (gpm):Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :Yes Fluid Flushed :Yes Bearing Leakage Observed :Yes Fluid Used :Water DriveShaft Rotated to Drain Mud :Yes MUD DATA Type :Mud Wt (ppg): Name :pH : % Oil / Water :/% Solid : DH Temp Avg / Max (degF):0.00 / 0.00 % Sand : SPP Start / End (gpm):715.00 / 1620.00 PV (cP): Flow Rate Avg / Max (gpm):536.39 / 575.00 YP (lhf2): Chloride Content (ppm): Lithology :Permafrost Principal Formation Name(s):Permafrost Page 5 BIT DATA Bit Number :1RR Nozzles :3x16,1x12 Bit Size (in):12.250 TFA (in2):0.6995 Manufacturer :HDBS Gauge Length :0.500(in) Model :622394 Dull Grade In :1-1-WT-A-I-E-NO-BHA Serial Number :11748526 Dull Grade Out :1-1-WT-A-I-E-NO-TD Existing Bit Hrs :3.67 Existing Ream Hrs :1.00 Cum Drilling Hrs :22.04 Cum Ream Hrs :1.00 PERFORMANCE Service Interrupt :No Trip For Failure :No LIH :No Service Interrupt Hrs : Problem Date :02/16/2012 COMMENTS Page 6 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA BHA Report IADC Rig BHA#3 Run#0300 Date In :02/20/2012 MD In (ft): 1208 TVD In (ft): 1160 Date Out :02/23/2012 MD Out (ft): 3426 TVD Out (ft): 2260 BIT DATA Bit Number :2 Nozzles :5x13 Bit Size (in):8.500 TFA (in2):0.6481 Manufacturer :HDBS Dull Grade In :0-1-CT-S-X-I-NO-TD Model :FX2526 Dull Grade Out :1-1-WT-A-X-I-NO-TD Serial Number :5013668 MOTOR DATA Motor Number :Bend (deg):1.503 OD (in):6.750 Nozzles (32nd):0.0 Manufacturer :Sperry Drilling Avg Diff Press :97.26 Model :SperryDrill Cumul Cir Hrs :48.34 Serial Number :675-997 Length (ft)Blade Bit - Center COMPONENT DATA (ft) Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(in)(lbpf) 1 HDBS FX 2526 PDC 5013668 7.000 2.250 8.500 117.60 P 4-1/2" REG 1.01 2 6 3/4" SperryDrill Lobe 6/7 - 5.0 stg 675-997 6.750 4.498 87.63 B 4-1/2" IF 27.21 3 Magnetic Spacing Collar 228316 6.720 2.250 108.40 B 4-1/2" IF 9.21 4 Gamma 90309331 6.740 1.920 111.73 B 4-1/2" IF 8.35 5 Smart Stabilizer 90309331 6.750 1.920 8.375 112.09 B 4-1/2" IF 1.95 90.21 6 Res/PWD/HCIM 90309331 6.750 1.920 112.09 B 4-1/2" IF 23.37 7 6 3/4" DM Collar 11676224 6.750 3.125 103.40 B 4-1/2" IF 9.20 8 TM HOC 728189 6.500 1.920 111.01 B 4-1/2" IF 9.96 9 Float Sub 172600 6.688 2.875 97.58 B 4-1/2" IF 2.41 10 NM Flex Collar 11342869 6.813 3.000 100.15 B 4-1/2" IF 31.09 11 NM Flex Collar 10941893 6.500 2.875 90.96 B 4-1/2" IF 30.63 12 NM Flex Collar 11564453 6.812 2.875 102.08 B 4-1/2" IF 31.08 13 4 1/2" XH B x 4 1/2" IF P 2563 6.188 2.563 84.80 B 4-1/2" XH 2.62 14 Weatherford Hyd. Drlg. Jar 17660562 6.500 2.500 88.24 B 4-1/2" XH 31.51 15 XT-39 B x 4 1/2" XH P 2563 6.000 2.500 79.63 B 4" Mod 2.62 Page 6 Length (ft)Blade Bit - Center COMPONENT DATA Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(lbpf) 16 17 x 4" XT-39 HWDP 4.000 2.563 29.70 525.84 Total:748.06 PERFORMANCE Section A HoursParameter Min Max Avg Activity BHA Weight (klb) WOB (klb):51 31 0Drilling : in Air (Total) :37.4719.57 RPM (rpm):40 80 78 Reaming :1.99 in Mud (Total) : Flow (gpm):400 480 456 Circ-Other :26.78 in Air (Bel Jars) :18.86 SPP (psig):850 1740 1473 Total :48.34 in Mud (Bel Jars) : BHA WEIGHT CALCULATION MESSAGE Mud Weight not valid could not calculate BHA weight in mud. PERFORMANCE Section B In Out Distance (ft)ROP (fph)Build (°/100')Turn (°/100')DLS (°/100') (deg)30.95 77.35 Oriented :589 122 n/a n/a 2.50Inclination (deg)259.82 261.20 Rotating :1629 110 0.00 -0.35 0.16Azimuth Total :2218 113 2.09 0.06 2.09 COMMENTS Sensor Distance; Res=48.78' Gamma=41.04'. PWD=60.96' , DDSr= 65.69' , Direction= 75.32' Float Collar = 1110.57' MD, Float Shoe = 1193.42' MD OBJECTIVES BHA 3 (Run 300) Objectives for this BHA will be to drill the intermediate section from 1,208' to a proposed TD at 3,800'+/-. Actual TD will be determined by on site geology. This assembly will use the same PDC bit used on the Savik 2 and Walakpa 12 wells. The 6-3/4" Sperrydrill mudmotor with MWD package to include Gamma/Res/PWD /Directional. The directional probe will be 75' back from the bit allowing the use of long collar surveys for better survey accuracy with more non magnetic spacing below the directional. Having the Gamma /Res above the motor will be beneficial to rig site geology for picking casing point as these tools are in a configuration that moves these tools closer to the bit. The assembly will need to achieve a 3.2° dogleg rate to stay with the directional plan. Directionally the assembly will be required to build inclination from 30.6° to 87°. Azimuth will have a minimal change of less then 2° in direction from the 257° planned direction to a 255.6° direction. The BHA has the objective of reaching TD for the section in a single run. The usual steps such as the casing test, Mud displacement, Drill out of the casing float equipment and excess cement will be performed. The assembly will drill 20' of new hole and then be used for the LOT. With these tasks complete this assembly will begin drilling the directional plan with a planned flow rate of 500 gpm. Rotary speed will be set at 70 rpm with max rotary at 80 rpm. Planned bit weight will be 5k-20k. ECD's will be monitored closely and the hole will dictate if a short trip becomes necessary. Once reaching TD the assembly will of course circulate the hole clean. Prior to pulling the BHA the assembly will be short tripped to the surface casing shoe and back to bottom for a final circulation. The objectives for this BHA are easily achievable and the 75' bit to sensor distance does not pose any problems as far as staying close to the directional proposal. RESULTS BHA # 3 (Run 300) Results: Results for the assembly were excellent. The assembly did in fact drill the section in one run as per plan. Dogleg rates were Page 7 RESULTS held low and were far below the original 5° per 100' originally planned. This low dogleg rate was due to the wellbore placement in the surface interval. All dogleg rates were below plan for the entire section. This intermediate was drilled with 27% slide percentage which is the lowest in the Intermediate section for the 4 Barrow gas wells drilled so far. Lowest wellbore tortuosity was also achieved when compared to the previous wells. A new directional plan had been made for this Walakpa 11 well with involvement from the directional driller on location. This plan was also manipulated in the field by the directional personnel. With the full intent of each section benefiting the next section with focus to eventually optimize drilling the production section with a motor. The lessons learned applied from previous BHA's coupled with the new directional plan supplied the customer with better days vs. depth cost savings to go along with the smoother wellbore. The re-run HDBS FX2526 was again very easy to steer on the 6-3/4" Sperrydrill 6/7-5.0 performance motor. Detection was excellent through out the interval. Keeping in mind this intermediate section was only 2,218' in drilled footage it was no surprise to see the bit look the same as when it went in the hole. Motor dogleg capability averaged 8.43°. Max motor dogleg capability not surprisingly showed with the higher angle in the hole. This max motor output was 12.46° with hole inclination over 75°. Certainly also not surprising was the lower motor output yields came at the lower angle when drilling began for this section. The lower motor output rates were in the high 6° to low 7° per 100' range when hole angle was at 30°. This BHA performed very well in the tangent section of the hole with only one 20' slide made for azimuth. The tangent section length was only 867' regardless of the length of the tangent it needs to be noted that the assembly held angle very well. The 20' slide made was to counter the .35° left hand walk tendency. To say the section went well directionally is not to say that problems did not arise while drilling the section due to the large clay content in this section. Drilling was discontinued at one point to circulate the hole clean. Over 5 bottoms up were pumped until the shakers could handle a 510 gpm flow rate. Once the flow rate had reached this level a weighted hi-vis sweep was pumped. ECD's were lowered and drilling continued. Upon TD of the section a short trip was to be made pulling on elevators however due to swabbing conditions the assembly was backreamed to the surface casing shoe. When tripping back to bottom the need to pump and rotate took place. Once on bottom the assembly was circulating the hole clean when clay reached surface packing off the flow line. Additional time spent cleaning the hole was deemed a requirement. With the hole clean the assembly was pulled on elevators with no swabbing occurring. As the BHA was hoisted to surface most of the tool joints on the 4" HWDP had accumulated clay. The stabilizer above the bit was severely packed with clay and the bit was found to extremely balled up. No signs of actual damage were visible on the BHA components after cleaning off the clay. The 7" casing run that followed was very uneventful with casing going straight to bottom with no indication of hole trouble. The cement job was done with the plug bumped. Drilling Statistics: Depth in 1,208' MD TVD 1,159' Depth out 3,426' TVD 2,256' Slide footage 589' Rotary footage 1,629' Slide percentage 27% Max dogleg for section - 4.96° Minimum dogleg for section .24°. Inclination in 30° Inclination out 76.31° (Last survey) Projected inclination 81.16° (Bit to Directional 75') BHA Tendency angle could be considered neutral in rotary. left hand walk of .35° per 100' Overall ROP average 113 fph / Rotating ROP average 110 fph / Sliding ROP average 122 fph Average rotary speed 78 rpm / Average bit wt 10k / Average flow rate 455 gpm / Average standpipe pressure 1,470 psi Motor used - 6 3/4" SperryDrill Lobe 6/7 - 5.0 stg w/1.5 adj bend setting Bit Used - HDBS FX 2526 PDC Bit grade at surface - 1-1-WT-A-X-I-NO-TD RECOMMENDATIONS Recommendation for BHA would center on bit jetting to help minimize bit balling. A tighter TFA should be implemented for next well. The bit drills a very large section of clay prior to reaching TD for the section. Higher flow rates have to be disregarded as the shakers are easily over run due to the high clay volumes. This may be an area that was over looked on this BHA and in hindsight could and should be captured as a lesson learned and discussion over different jetting options needs to be held. OTHER Page 8 BHA Schematic North Slope Borough Walakpa 11 IADC Rig BHA # : 3 Run # : 300 Drillstring : Drillstring OD COMPONENT DATA (in)(ft) Length Description HDBS FX 2526 PDC (Gauge: 8.500 in)7.000 1.01 6 3/4" SperryDrill Lobe 6/7 - 5.0 stg6.750 27.21 Magnetic Spacing Collar6.720 9.21 Gamma6.740 8.35 Smart Stabilizer (Gauge: 8.375 in, Pos*: 44.43 ft)6.750 1.95 Res/PWD/HCIM6.750 23.37 6 3/4" DM Collar6.750 9.20 TM HOC6.500 9.96 Float Sub6.688 2.41 NM Flex Collar6.813 31.09 NM Flex Collar6.500 30.63 NM Flex Collar6.812 31.08 4 1/2" XH B x 4 1/2" IF P6.188 2.62 Weatherford Hyd. Drlg. Jar6.500 31.51 XT-39 B x 4 1/2" XH P6.000 2.62 17 x 4" XT-39 HWDP4.000 525.84 *Pos: Measured as distance from bottom of the component. Page 3 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA Motor Performance Report SUMMARY Depth In/Out (ft):1208.00 /3426.00BHA Number :3 Date In/Out :02/20/2012 /02/23/2012Run Number :0300 Hole Size (in):8.5Bit Number :2 DFB (ft) Component Yes/No Type Value Sleeve Stab No 1.50° bend9.63 Bent Housing Yes Adjustable Bent Housing Pad No 28.22 Motor Top Yes Gauge 8.38 in46.76 Lower String Stab Yes Reg Upper String Stab No MOTOR CONFIGURATION MOTOR PARAMETERS Serial Number :675-997 Lobe Config :6:7 Motor Run #:3 Stat Elastomer :Nitrile OD (in):6.75 ID (in):4.5 Short Brg Pack :Yes Flex Collar Used :No Arr Ret Rotor Nozzle (32nd):0.0 Pick Up Sub :Yes Yes Bit Box Protr :Yes No MOTOR RUN DATA Directional Driller(s):Mark Brouillet,Art Morgan Application Details :Steerable Drilling Max Dogleg While Rotating :4.96(°/100') RPM :80.00 Motor Stalled :No Max Dogleg Overpulled In (°/100'):4.96 Force (klb):3.00 Float Valve :Yes Max Dogleg Pushed Through (°/100'):4.96 Force (klb):5.00 DP Filter :No Page 7 Inc Start/End (deg):30.95 /77.349 Interval Oriented / Rot. (ft):589.00 /1629.00 Hole Azimuth Start / End (deg):259.816 /261.199 Directional Perf Ori / Rot (°/100'):0.00 /0.00 Jarring Occurred :No HOURS Existing Hrs :0.00 Circ Hrs :26.78 Total Hrs This Run :48.34 Drilling Hrs :19.57 Reaming Hrs :1.99 New Cumulative Hrs :48.34 DRILLING DATA Diff Press RPM Rotn Torque Drag Up/Down WOB ROP Oriented ROP Rotated (psig) (ft-lb) (klb) (fph) (fph)(klb) Avg 97.26 78 2800.00 52.80 /45.20 9.68 122 110 Max 90.00 80 3000.00 57.00 /47.00 13.00 169 156 PRE-RUN TESTS Motor Tested Pre-Run :Yes with Bit/MWD :Yes / Yes Dump Sub Operating :No Brg Play : Flow 1 (gpm):400.00 Pressure 1 (psig):620.00 Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Bearing Leakage Observed :No POST-RUN TESTS Motor Tested Post-Run :No with Bit/MWD :No / No Dump Sub Operating :No Brg Play : Flow 1 (gpm):Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :Yes Fluid Flushed :Yes Bearing Leakage Observed :Yes Fluid Used :Water DriveShaft Rotated to Drain Mud :Yes MUD DATA Type :Mud Wt (ppg): Name :pH : % Oil / Water :/% Solid : DH Temp Avg / Max (degF):0.00 / 0.00 % Sand : SPP Start / End (gpm):850.00 / 1740.00 PV (cP): Flow Rate Avg / Max (gpm):456.35 / 480.00 YP (lhf2): Chloride Content (ppm): Lithology :Sandstone Principal Formation Name(s):Walakpa Sands Page 8 BIT DATA Bit Number :2 Nozzles :5x13 Bit Size (in):8.500 TFA (in2):0.6481 Manufacturer :HDBS Gauge Length :3.000(in) Model :FX2526 Dull Grade In :0-1-CT-S-X-I-NO-TD Serial Number :5013668 Dull Grade Out :1-1-WT-A-X-I-NO-TD Existing Bit Hrs :0.00 Existing Ream Hrs :0.00 Cum Drilling Hrs :19.57 Cum Ream Hrs :1.99 PERFORMANCE Service Interrupt :No Trip For Failure :No LIH :No Service Interrupt Hrs :0.00 Problem Date :02/20/2012 COMMENTS Good performance from motor. Motor was used on previous well's intermediate section and re-run with no hesitation on this well. Page 9 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA BHA Report IADC Rig BHA#4 Run#0400 Date In :02/25/2012 MD In (ft): 3426 TVD In (ft): 2260 Date Out :02/28/2012 MD Out (ft): 4275 TVD Out (ft): 2327 BIT DATA Bit Number :3 Nozzles :3x13 Bit Size (in):6.125 TFA (in2):0.3889 Manufacturer :HDBS Dull Grade In :0-0-NO-A-E-I-NO-BHA Model :QH1R Dull Grade Out :1-2-WT-A-E-1-CT-HR Serial Number :11562667 MOTOR DATA Motor Number :Bend (deg):1.504 OD (in):4.750 Nozzles (32nd):0.0 Manufacturer :Sperry Drilling Avg Diff Press :208.16 Model :SperryDrill Cumul Cir Hrs :67.96 Serial Number :D5183 Length (ft)Blade Bit - Center COMPONENT DATA (ft) Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(in)(lbpf) 1 HDBS QH1R Milltooth 11562667 5.900 2.000 6.125 82.47 P 3-1/2" REG 0.62 2 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ ABI D5183 4.750 2.901 44.52 B 3-1/2" IF 38.26 Btm Sleeve Stabilizer 6.000 3.29 3 Float Sub 11839027 4.750 2.600 49.69 B 3-1/2" IF 2.19 4 ABI Receiver DSP Collar 11644765 4.750 1.920 50.52 B 3-1/2" IF 9.27 5 Inline Stabilizer (ILS)1524791 4.750 1.420 5.940 54.99 B 3-1/2" IF 3.58 52.23 6 Res/ Gamma/ HCIM 90309333 4.730 1.420 37.43 B 3-1/2" IF 24.40 7 4 3/4" DM Collar 227683 4.750 2.610 47.00 B 3-1/2" IF 8.56 8 Neutron / Density (Nuke Tool)90309203 4.750 1.420 54.99 B 3-1/2" IF 25.48 Btm Sleeve Stabilizer 5.750 91.29 9 4 3/4" PWD 90308255 4.750 1.250 47.90 B 3-1/2" IF 9.18 10 4 3/4" TM HOC 11578413 4.750 2.812 46.10 B 3-1/2" IF 11.28 11 Well Commander Circ sub w/Ball Catcher SPS6348 4.950 1.300 45.34 B 3-1/2" IF 11.41 12 Flex Collar 11474149 4.670 2.250 46.84 B 3-1/2" IF 31.04 Page 9 Length (ft)Blade Bit - Center COMPONENT DATA Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(lbpf) 13 Flex Collar 11474151 4.680 2.250 46.84 B 3-1/2" IF 31.00 14 Flex Collar 11623620 4.780 2.250 46.84 B 3-1/2" IF 30.90 15 X-Over Sub 2438 4.970 2.500 50.19 B 4" Mod 2.64 16 4-3/4" Hyd Jars 14001412 4.820 2.000 43.90 B 4" Mod 29.28 17 4" XT -39 HWDP (1 Jt )4.000 2.563 29.70 31.63 Total:300.72 PERFORMANCE Section A HoursParameter Min Max Avg Activity BHA Weight (klb) WOB (klb):61 51 4Drilling : in Air (Total) :13.4347.04 RPM (rpm):35 70 63 Reaming :11.77 in Mud (Total) : Flow (gpm):200 200 200 Circ-Other :9.15 in Air (Bel Jars) :11.21 SPP (psig):1100 1410 1321 Total :67.96 in Mud (Bel Jars) : BHA WEIGHT CALCULATION MESSAGE Mud Weight not valid could not calculate BHA weight in mud. PERFORMANCE Section B In Out Distance (ft)ROP (fph)Build (°/100')Turn (°/100')DLS (°/100') (deg)77.35 84.29 Oriented :266 9 n/a n/a 3.50Inclination (deg)261.20 256.06 Rotating :583 31 0.00 0.00 0.00Azimuth Total :849 18 0.82 -0.60 1.01 COMMENTS Sensor Distances ABI=10.71', SWRO=63.11', RES=63.61', Gamma=70.67', DDSr=73.51', Dir=81.90', ALD=91.42',CTN=106.20',PWD=117.91' Casing Float collar = 3,328' / Casing shoe = 3,415' / RFO =246.07° OBJECTIVES BHA # 4 (Run 400) Objectives; BHA will be a steerable assembly utilizing a HDBS QH1R Milltooth bit with the 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI mudmotor. Adjustable bend setting will be at 1.5°. The slower speed motor has a .30 rev/gal which will be better suited for the milltooth bit. This combination is designed for giving the best option available for directional control in the production zone. It is assumed to be a very loose unconsolidated sand with expected difficulties in build rates and holding inclination. MWD package to include Gamma/Res/Neutron Density/ PWD/Directional. Due to losses on the last well a well commander circulating sub will be run above the mwd package. The BHA will be tasked with several objectives starting out with the normal sequence of events. These tasks include testing casing, drilling float equipment, drill 20' of new hole, displacement over to the new mud and finally the FIT. With these objectives met the assembly will be put to drilling ahead. This assembly will be geo-steered throughout the production interval. The BHA will be expected to drill this production section to TD at the proposed depth of 5,324' MD. BHA will then circulate hole clean, short trip and a final circulation prior to being tripped to surface. RESULTS BHA # 4 (Run 400) Results: Page 10 RESULTS Results for this assembly were not favorable. The BHA had extremely slow ROP rates with very slow ROP while sliding to follow geological objectives. The production zone was far lower in TVD then expected as this assembly had to drill what should be considered an excessive amount of footage in shale. This needs to be taken into consideration when evaluating the slow ROP encountered. The assembly started performing directional work from 77° inclination with the intent of building to 88° inclination upon entering the pay sands. This assembly began drilling at 3,426' MD and did not enter the payzone until 3,718' MD 2,295' TVD. The 7" Casing shoe was set at 3,415' MD with TVD being 2,256' this BHA had to drill 292' while dropping 39' of TVD before leaving the shale and entering the paysand. This footage was 34% of the total footage for the BHA. The BHA drilled to 4,275' MD when it was decided to trip the assembly to surface due to hours on the bit. The assembly was inspected on surface with no damage to the BHA components and the milltooth bit was found to be in surprisingly good shape. Drilling Statistics; Depth in 3,426' Depth out 4,275' Total footage 849' Slide footage 266' Rotary footage 583' Slide percentage 31% Inclination in 77° Out 84° assembly was built to 90.5° then turned down per geology. Azimuth in 261° out 255° Max dogleg 7.02° Average ROP 18 fph average rop rotating 31 fph average rop sliding 9 fph Average flow rate 200 gpm Average standpipe pressure 1,320 psi. Average rotary speed 63 rpm average bit weight 9k Max bit weight 18k Drilling hrs (Including drilling out float equipment 47.04 hrs circulating hrs 9.15 reaming hrs. 11.77 total pumps on time 67.96 Motor used 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI 1.5° bend setting .30 rev/gal Bit used HDBS QH1R Milltooth bit Jetted 3 X 13 TFA .3889 Grade at surface 1-2-WT-A-E-1-CT-HR BHA tendency in rotary showed a slight average .4° drop rate per 100' with a 1/2 degree right hand walk per100' RECOMMENDATIONS BHA recommendations would be as follows: PDC bit for higher ROP's eliminating concerns over hours or k-revs which caused a trip for bit with this assembly. A 5" motor could be utilized with a higher rev/gal of .77 to also increase ROP OTHER Page 11 BHA Schematic North Slope Borough Walakpa 11 IADC Rig BHA # : 4 Run # : 400 Drillstring : Drillstring OD COMPONENT DATA (in)(ft) Length Description HDBS QH1R Milltooth (Gauge: 6.125 in)5.900 0.62 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI4.750 38.26 Btm Sleeve Stabilizer (Gauge: 6.000 in, Pos*: 2.67 ft) Float Sub4.750 2.19 ABI Receiver DSP Collar4.750 9.27 Inline Stabilizer (ILS) (Gauge: 5.940 in, Pos*: 1.89 ft)4.750 3.58 Res/ Gamma/ HCIM4.730 24.40 4 3/4" DM Collar4.750 8.56 Neutron / Density (Nuke Tool)4.750 25.48 Btm Sleeve Stabilizer (Gauge: 5.750 in, Pos*: 4.41 ft) 4 3/4" PWD4.750 9.18 4 3/4" TM HOC4.750 11.28 Well Commander Circ sub w/Ball Catcher4.950 11.41 Flex Collar4.670 31.04 Flex Collar4.680 31.00 Flex Collar4.780 30.90 X-Over Sub4.970 2.64 4-3/4" Hyd Jars4.820 29.28 4" XT -39 HWDP (1 Jt )4.000 31.63 *Pos: Measured as distance from bottom of the component. Page 4 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA Motor Performance Report SUMMARY Depth In/Out (ft):3426.00 /4275.00BHA Number :4 Date In/Out :02/25/2012 /02/28/2012Run Number :0400 Hole Size (in):6.13Bit Number :3 DFB (ft) Component Yes/No Type Value Gauge 6.00 in3.28 Sleeve Stab Yes Sleeve 1.50° bend5.66 Bent Housing Yes Adjustable Bent Housing Pad No 38.88 Motor Top Yes Gauge 5.94 in52.23 Lower String Stab Yes Reg Upper String Stab No MOTOR CONFIGURATION MOTOR PARAMETERS Serial Number :D5183 Lobe Config :7:8 Motor Run #:4 Stat Elastomer :Nitrile OD (in):4.75 ID (in):2.9 Short Brg Pack :Yes Flex Collar Used :No Arr Ret Rotor Nozzle (32nd):0.0 Pick Up Sub :Yes No Bit Box Protr :Yes No MOTOR RUN DATA Directional Driller(s):Mark Brouillet,Art Morgan Application Details :Steerable Drilling Max Dogleg While Rotating :4.08(°/100') RPM :70.00 Motor Stalled :No Max Dogleg Overpulled In (°/100'):4.08 Force (klb):5.00 Float Valve :Yes Max Dogleg Pushed Through (°/100'):4.08 Force (klb):5.00 DP Filter :No Page 10 Inc Start/End (deg):77.349 /84.293 Interval Oriented / Rot. (ft):266.00 /583.00 Hole Azimuth Start / End (deg):261.199 /256.063 Directional Perf Ori / Rot (°/100'):3.50 /0.00 Jarring Occurred : HOURS Existing Hrs :0.00 Circ Hrs :9.15 Total Hrs This Run :67.96 Drilling Hrs :47.04 Reaming Hrs :11.77 New Cumulative Hrs :67.96 DRILLING DATA Diff Press RPM Rotn Torque Drag Up/Down WOB ROP Oriented ROP Rotated (psig) (ft-lb) (klb) (fph) (fph)(klb) Avg 208.16 63 0.00 63.33 /36.67 13.71 9 31 Max 250.00 70 0.00 68.00 /44.00 15.00 22 75 PRE-RUN TESTS Motor Tested Pre-Run :Yes with Bit/MWD :Yes / Yes Dump Sub Operating :No Brg Play : Flow 1 (gpm):160.00 Pressure 1 (psig):720.00 Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Bearing Leakage Observed :No POST-RUN TESTS Motor Tested Post-Run :No with Bit/MWD :No / No Dump Sub Operating :No Brg Play : Flow 1 (gpm):Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Fluid Flushed :Yes Bearing Leakage Observed :No Fluid Used :Water DriveShaft Rotated to Drain Mud :Yes MUD DATA Type :Mud Wt (ppg): Name :pH : % Oil / Water :/% Solid : DH Temp Avg / Max (degF):0.00 / 0.00 % Sand : SPP Start / End (gpm):1100.00 / 1410.00 PV (cP): Flow Rate Avg / Max (gpm):200.00 / 200.00 YP (lhf2): Chloride Content (ppm): Lithology :Sandstone Principal Formation Name(s):Walakpa Sands Page 11 BIT DATA Bit Number :3 Nozzles :3x13 Bit Size (in):6.125 TFA (in2):0.3889 Manufacturer :HDBS Gauge Length :4.000(in) Model :QH1R Dull Grade In :0-0-NO-A-E-I-NO-BHA Serial Number :11562667 Dull Grade Out :1-2-WT-A-E-1-CT-HR Existing Bit Hrs :0.00 Existing Ream Hrs :0.00 Cum Drilling Hrs :47.04 Cum Ream Hrs :11.77 PERFORMANCE Service Interrupt :No Trip For Failure :No LIH :No Service Interrupt Hrs :0.00 Problem Date :02/25/2012 COMMENTS No problems with this motor during run Page 12 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA BHA Report IADC Rig BHA#5 Run#0500 Date In :02/29/2012 MD In (ft): 4275 TVD In (ft): 2327 Date Out :03/02/2012 MD Out (ft): 4708 TVD Out (ft): 2359 BIT DATA Bit Number :4 Nozzles :3x13 Bit Size (in):6.125 TFA (in2):0.3889 Manufacturer :HDBS Dull Grade In :NEW Model :QH1R Dull Grade Out :1-1-WT-A-E-I-NO-TD Serial Number :11484396 MOTOR DATA Motor Number :Bend (deg):1.505 OD (in):4.750 Nozzles (32nd):0.0 Manufacturer :Sperry Drilling Avg Diff Press :121.82 Model :SperryDrill Cumul Cir Hrs :27.72 Serial Number :475998 Length (ft)Blade Bit - Center COMPONENT DATA (ft) Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(in)(lbpf) 1 HDBS QH1R Milltooth 11484396 5.900 2.000 6.125 82.47 P 3-1/2" REG 0.62 2 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ ABI 475998 4.750 2.901 44.52 B 3-1/2" IF 38.22 Btm Sleeve Stabilizer 6.000 3.29 3 Float Sub 11339026 4.750 2.600 49.69 B 3-1/2" IF 2.19 4 Spacer Sub 11839027 4.730 2.250 49.69 B 3-1/2" IF 2.19 5 Res/ Gamma/ HCIM 90314958 4.730 1.420 37.43 B 3-1/2" IF 24.34 6 4 3/4" DM Collar 227683 4.750 2.610 47.00 B 3-1/2" IF 8.56 7 Neutron / Density (Nuke Tool)90309203 4.750 1.420 54.99 B 3-1/2" IF 25.48 Btm Sleeve Stabilizer 5.750 80.53 8 4 3/4" PWD 90308255 4.750 1.250 47.90 B 3-1/2" IF 9.18 9 4 3/4" TM HOC 97552 4.750 2.812 46.10 B 3-1/2" IF 10.93 10 Well Commander Circ sub w/Ball Catcher SPS6348 4.950 1.300 45.34 B 3-1/2" IF 11.41 11 Flex Collar 11474149 4.670 2.250 46.84 B 3-1/2" IF 31.04 12 Flex Collar 11474151 4.680 2.250 46.84 B 3-1/2" IF 31.00 Page 12 Length (ft)Blade Bit - Center COMPONENT DATA Item #Description Serial Number OD ID Gauge Weight Top Connection(in)(in)(lbpf) 13 Flex Collar 11623620 4.780 2.250 46.84 B 3-1/2" IF 30.90 14 X-Over Sub 2438 4.970 2.500 50.19 B 4" Mod 2.64 15 4-3/4" Hyd Jars 14001412 4.820 2.000 43.90 B 4" Mod 29.28 16 4" XT -39 HWDP (1 Jt )4.000 2.563 29.70 31.63 Total:289.61 PERFORMANCE Section A HoursParameter Min Max Avg Activity BHA Weight (klb) WOB (klb):15 18 18 Drilling : in Air (Total) :12.8610.70 RPM (rpm):000Reaming :6.62 in Mud (Total) : Flow (gpm):200 200 200 Circ-Other :10.40 in Air (Bel Jars) :10.63 SPP (psig):1250 1530 1433 Total :27.72 in Mud (Bel Jars) : BHA WEIGHT CALCULATION MESSAGE Mud Weight not valid could not calculate BHA weight in mud. PERFORMANCE Section B In Out Distance (ft)ROP (fph)Build (°/100')Turn (°/100')DLS (°/100') (deg)84.29 85.32 Oriented :71 15 n/a n/a 0.00Inclination (deg)256.06 250.16 Rotating :362 61 0.00 0.00 0.00Azimuth Total :433 40 0.24 -1.36 1.38 COMMENTS Sensor Distances ABI=10.62', SWRO= 52.44', RES= 52.94', Gamma= 60', DDSr= 62.84', Dir= 71.14', ALD= 80.66', CTN= 95.44',PWD= 107.15 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI / Motor SN # 475-998 / Adj Bend setting 1.5° / Rev/Gal .30 Bit = HDBS QH1R Milltooth Jetted 3 X 13 / TFA = .3889 Casing Float collar = 3,328' / Casing shoe = 3,415' / RFO = 21.31° OBJECTIVES BHA # 5 (Run 500) Objectives: This BHA is a continuation of BHA # 4 that had to be tripped out due to hours on the bit. Objectives will remain the same for this BHA. Changes to BHA configuration did take place. These changes are minimal but are described as follows. The magnetic spacing collar run above the motor was dropped along with the ILS stabilizer. This moved MWD to short collar for surveys which showed it as a viable alternative to the long collar survey method previously used on BHA # 4. The objective for removing these components were to bring the logging tools down closer to the bit due to some formation uncertainties that were a concern to geology. Other then these 2 components and the new milltooth bit the BHA mirrors BHA # 4. Objectives will carry forward from the depth of 4,275' MD. RESULTS BHA # 5 (Run 500) Results: This BHA did not perform to what was expected. The assembly did show improved ROP's and was well on the way to drilling the section to TD. The difficulty began when the BHA exited the formation. Steering per geology was being undertaken with directive to drop angle from 88° down to 84° as it was thought this would place the assembly into the Page 13 RESULTS middle section of the pay sand. Apparently the dip had flattened out which in turn put the assembly out of zone at the bottom. The assembly was now in the Kingak shale formation. Projections were done and discussion held with management personnel in town to discuss options. The list of options were short call the well TD at 4,708' MD. Option two would be attempt an open hole sidetrack and the last option being drill ahead building angle and reacquire pay. The last option mentioned projected that the assembly would need to drill almost 400' before re-entering the pay zone. This option was no longer feasable. The final decision was to be attempting the open hole sidetrack. With a BOP test coming on in 24 hrs time was minimal. The assembly would have to complete the open hole sidetrack and drill ahead with hopes of obtaining more payzone then was to be given up when pulling back for the sidetrack. The open hole sidetrack attempt failed and this BHA was used to clean out to bottom to 4,708' MD. This was TD for the well. The BHA was used to circulate the hole clean and then tripped to surface. At this time Sperry personnel began organizing a waybill for shipping tools back to the R&M facility in deadhorse. Tools would be torn down and inspected then sent back to location for the next Barrow gas fields well. This BHA basically drilled 433' then was used to clean the hole in preparation for running completion. Drilling Statistics: Depth in 4,275' Depth out 4,708' Total footage 433' slide footage 71' rotary footage 362' Slide percentage 16% ROP average 41 fph ROP average sliding 15 fph ROP average rotating 61 fph BHA tendency improved over last assembly when considering this BHA held angle or dropped very slightly in rotary dropping less then a 1/4 degree per 100' Average flow rate 200 average standpipe pressure 1,430 psi average rotary speed 70 rpm average bit weight 15k Motor used 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI 1.5° bend setting .30 rev/gal Bit used HDBS QH1R Milltooth bit Jetted 3 X 13 TFA .3889 Grade at surface 1-1-WT-A-E-I-NO-TD RECOMMENDATIONS Same recommendations given for BHA 4 apply to this BHA. These are listed below: PDC bit for higher ROP's eliminating concerns over hours or k-revs which caused a trip for bit with this assembly. A 5" motor could be utilized with a higher rev/gal of .77 to also increase ROP. OTHER Page 14 BHA Schematic North Slope Borough Walakpa 11 IADC Rig BHA # : 5 Run # : 500 Drillstring : Drillstring OD COMPONENT DATA (in)(ft) Length Description HDBS QH1R Milltooth (Gauge: 6.125 in)5.900 0.62 4 3/4" SperryDrill Lobe 7/8 - 2.9 stgW/ABI4.750 38.22 Btm Sleeve Stabilizer (Gauge: 6.000 in, Pos*: 2.67 ft) Float Sub4.750 2.19 Spacer Sub4.730 2.19 Res/ Gamma/ HCIM4.730 24.34 4 3/4" DM Collar4.750 8.56 Neutron / Density (Nuke Tool)4.750 25.48 Btm Sleeve Stabilizer (Gauge: 5.750 in, Pos*: 4.41 ft) 4 3/4" PWD4.750 9.18 4 3/4" TM HOC4.750 10.93 Well Commander Circ sub w/Ball Catcher4.950 11.41 Flex Collar4.670 31.04 Flex Collar4.680 31.00 Flex Collar4.780 30.90 X-Over Sub4.970 2.64 4-3/4" Hyd Jars4.820 29.28 4" XT -39 HWDP (1 Jt )4.000 31.63 *Pos: Measured as distance from bottom of the component. Page 5 WELL INFORMATION Customer :North Slope Borough Well Name :Walakpa 11 AK-XX-0008370345Job Number : Rig Name :Kuukpik 5 Field Name :Walakpa Gas Field Country :USA Motor Performance Report SUMMARY Depth In/Out (ft):4275.00 /4708.00BHA Number :5 Date In/Out :02/29/2012 /03/02/2012Run Number :0500 Hole Size (in):6.13Bit Number :4 DFB (ft) Component Yes/No Type Value Gauge 6.00 in3.28 Sleeve Stab Yes Sleeve 1.50° bend5.66 Bent Housing Yes Adjustable Bent Housing Pad No 38.84 Motor Top Yes Lower String Stab No Upper String Stab No MOTOR CONFIGURATION MOTOR PARAMETERS Serial Number :475998 Lobe Config :7:8 Motor Run #:5 Stat Elastomer :Nitrile OD (in):4.75 ID (in):2.9 Short Brg Pack :Yes Flex Collar Used :No Arr Ret Rotor Nozzle (32nd):0.0 Pick Up Sub :Yes No Bit Box Protr :Yes No MOTOR RUN DATA Directional Driller(s):Mark Brouillet,Art Morgan Application Details : Max Dogleg While Rotating :(°/100') RPM :Motor Stalled :No Max Dogleg Overpulled In (°/100'):Force (klb):Float Valve :No Max Dogleg Pushed Through (°/100'):Force (klb):DP Filter :No Page 13 Inc Start/End (deg):84.293 /85.32 Interval Oriented / Rot. (ft):71.00 /362.00 Hole Azimuth Start / End (deg):256.063 /250.16 Directional Perf Ori / Rot (°/100'):0.00 /0.00 Jarring Occurred :No HOURS Existing Hrs :0.00 Circ Hrs :10.40 Total Hrs This Run :27.72 Drilling Hrs :10.70 Reaming Hrs :6.62 New Cumulative Hrs :27.72 DRILLING DATA Diff Press RPM Rotn Torque Drag Up/Down WOB ROP Oriented ROP Rotated (psig) (ft-lb) (klb) (fph) (fph)(klb) Avg 121.82 0 0.00 65.56 /38.44 17.77 15 61 Max 80.00 0 0.00 66.00 /40.00 18.00 20 110 PRE-RUN TESTS Motor Tested Pre-Run :Yes with Bit/MWD :Yes / Yes Dump Sub Operating :No Brg Play : Flow 1 (gpm):160.00 Pressure 1 (psig):680.00 Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Bearing Leakage Observed :No POST-RUN TESTS Motor Tested Post-Run :No with Bit/MWD :No / No Dump Sub Operating :No Brg Play : Flow 1 (gpm):Pressure 1 (psig): Flow 2 (gpm):Pressure 2 (psig): Driveshaft Rotation Observed :No Fluid Flushed :Yes Bearing Leakage Observed :No Fluid Used :Water DriveShaft Rotated to Drain Mud :Yes MUD DATA Type :Mud Wt (ppg): Name :pH : % Oil / Water :/% Solid : DH Temp Avg / Max (degF):0.00 / 0.00 % Sand : SPP Start / End (gpm):1250.00 / 1530.00 PV (cP): Flow Rate Avg / Max (gpm):200.00 / 200.00 YP (lhf2): Chloride Content (ppm): Lithology :Sandstone Principal Formation Name(s):Walakpa Sands Page 14 BIT DATA Bit Number :4 Nozzles :3x13 Bit Size (in):6.125 TFA (in2):0.3889 Manufacturer :HDBS Gauge Length :4.000(in) Model :QH1R Dull Grade In :NEW Serial Number :11484396 Dull Grade Out :1-1-WT-A-E-I-NO-TD Existing Bit Hrs :0.00 Existing Ream Hrs :0.00 Cum Drilling Hrs :10.70 Cum Ream Hrs :6.62 PERFORMANCE Service Interrupt :No Trip For Failure :No LIH :No Service Interrupt Hrs :0.00 Problem Date :02/29/2012 COMMENTS Page 15 End of Well Report for North Slope Borough Rig:Rig:Rig:Rig:Kuukpik 5 Well Name:Well Name:Well Name:Well Name:Walakpa 11 Field Name:Field Name:Field Name:Field Name:Walakpa Gas Field Country:Country:Country:Country:USA Job Number:Job Number:Job Number:Job Number:AK-XX-0008370345 Job Start Date:Job Start Date:Job Start Date:Job Start Date:13-Feb-12 API Number:API Number:API Number:API Number:50-023-20038-00-00 Page 1Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report General InformationGeneral InformationGeneral InformationGeneral Information Company:Company:Company:Company:North Slope Borough Rig:Rig:Rig:Rig:Kuukpik 5 Well:Well:Well:Well:Walakpa 11 Field:Field:Field:Field:Walakpa Gas Field State:State:State:State:Alaska County:County:County:County:North Slope Borough Country:Country:Country:Country:USA API Number:API Number:API Number:API Number:50-023-20038-00-00 Sperry Job Number:Sperry Job Number:Sperry Job Number:Sperry Job Number:AK-XX-0008370345 Job Start Date:Job Start Date:Job Start Date:Job Start Date:13-Feb-12 Job End Date:Job End Date:Job End Date:Job End Date:04-Mar-12 North Reference:North Reference:North Reference:North Reference:True (deg)(deg)(deg)(deg)::::Total CorrectionTotal CorrectionTotal CorrectionTotal Correction 17.615 Dip AngleDip AngleDip AngleDip Angle (deg)(deg)(deg)(deg)::::80.783 Total Magnetic FieldTotal Magnetic FieldTotal Magnetic FieldTotal Magnetic Field (nT)(nT)(nT)(nT)::::57528 Date of Magnetic Data:Date of Magnetic Data:Date of Magnetic Data:Date of Magnetic Data:16 February, 2012 Well Head coordinates N:Well Head coordinates N:Well Head coordinates N:Well Head coordinates N:71 deg. 4 min 20.2 sec North Well Head coordinates E:Well Head coordinates E:Well Head coordinates E:Well Head coordinates E:156 deg. 53 min 33.97 sec West Vertical section directionVertical section directionVertical section directionVertical section direction (deg)(deg)(deg)(deg)::::255.16 Unit Number:Unit Number:Unit Number:Unit Number:122 MWD Engineers:MWD Engineers:MWD Engineers:MWD Engineers:Joe Granados, Lucas Smith, Blake Delaney Company Representatives:Company Representatives:Company Representatives:Company Representatives:Joe McInnis, Don Breeden Company Geologist:Company Geologist:Company Geologist:Company Geologist:Al Heinrich, Al Heinrich Page 3Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Operational OverviewOperational OverviewOperational OverviewOperational Overview Sperry Drilling was called out on February 13, 2012 to provide MWD and LWD services for North Slope Borough’s well Walakpa 11. Run 100 is a conductor clean out run drilled with dumb iron to 221’ MD / 221’ TVD. Run 200 was a 12.25” surface hole run drilled with an 8” performance motor and mill-tooth bit to 9 5/8” casing point at 1,208’ MD / 1,159’ TVD. Pulled out of the hole to run 9 5/8” casing. Run 300 was a 8.5” intermediate hole section drilled with a 6” performance motor and PDC bit from 1,208’ MD / 1,159’ TVD to 7” casing point at 3,426’ MD / 2,256’ TVD. Pulled out of the hole to run 7” casing. Run 400 was a 6.125” production hole section drilled with a 4” performance motor and tri-cone bit from 3,426’ MD / 2,256’ TVD to 4275’ MD / 2326’ TVD. Pulled out of the hole to change the bit. Run 500 was a 6.125” production hole section drilled with a 4” performance motor and tri-cone bit from 4,275’ MD / 2,326’ TVD to 4,708’ MD / 2,357’ TVD. Pulled out of the hole to run 4 ½” liner. Thank you for using Sperry Drilling. Page 4Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report (in) Summary of MWD RunsSummary of MWD RunsSummary of MWD RunsSummary of MWD Runs Run No. Bit No. Hole Size MWD Service Start Depth End Depth Run Start Date Time Run End Date Time BRT Hrs Oper. Hrs Circ. Hrs Max Temp.Serv Int. Trip for MWD Failure Type(ft)(ft)(degF)(ft) Drill/Wipe Distance 200 2 12.25 P4M 221.00 1208.00 987.00 15-Feb-12 07:45 17-Feb-12 01:37 41.87 42.098 27.044 102.56 No No 300 3 8.5 P4M 1208.00 3426.00 2218.00 19-Feb-12 10:56 23-Feb-12 09:00 82.07 82.249 46.674 102.56 No No 400 4 6.125 P4M 3426.00 4275.00 849.00 25-Feb-12 12:00 28-Feb-12 06:20 90.33 90.640 63.804 88.52 No No 500 5 6.125 PPM 4275.00 4708.00 433.00 29-Feb-12 05:00 02-Mar-12 01:20 56.33 56.647 34.437 78.00 No No Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 5 Bit Run SummaryBit Run SummaryBit Run SummaryBit Run Summary Run Time DataRun Time DataRun Time DataRun Time Data MWD RunMWD RunMWD RunMWD Run ::::200 Run StartRun StartRun StartRun Start 15-Feb-12 19:45 BRT HrsBRT HrsBRT HrsBRT Hrs ::::41.87 Circ. HrsCirc. HrsCirc. HrsCirc. Hrs 27.04:::::::: ::::::::Rig Bit NoRig Bit NoRig Bit NoRig Bit No ::::2 Run EndRun EndRun EndRun End 17-Feb-12 13:37 Hole SizeHole SizeHole SizeHole Size (in)(in)(in)(in)::::12.25 Oper. HrsOper. HrsOper. HrsOper. Hrs 42.10 Drilling DataDrilling DataDrilling DataDrilling Data Start DepthStart DepthStart DepthStart Depth (ft)(ft)(ft)(ft)::::221.00 FootageFootageFootageFootage (ft)(ft)(ft)(ft)::::987.00 Avg WOBAvg WOBAvg WOBAvg WOB (klb)(klb)(klb)(klb)::::18.0 Avg ROPAvg ROPAvg ROPAvg ROP (fph)(fph)(fph)(fph)::::54.00 End DepthEnd DepthEnd DepthEnd Depth (ft)(ft)(ft)(ft)::::1208.00 Avg Flow RateAvg Flow RateAvg Flow RateAvg Flow Rate(gpm)(gpm)(gpm)(gpm)::::500 Avg TOBAvg TOBAvg TOBAvg TOB (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::1371 Avg SPPAvg SPPAvg SPPAvg SPP (psig)(psig)(psig)(psig)::::1279 Drilling HrsDrilling HrsDrilling HrsDrilling Hrs (hr)(hr)(hr)(hr)::::18.027 Avg RPMAvg RPMAvg RPMAvg RPM (rpm)(rpm)(rpm)(rpm)::::64 Avg BendAvg BendAvg BendAvg Bend (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::NA Mud DataMud DataMud DataMud Data Mud TypeMud TypeMud TypeMud Type ::::Native/Spud Mud % Sand% Sand% Sand% Sand (%)(%)(%)(%) YPYPYPYP % Solids% Solids% Solids% Solids PVPVPVPV (cP)(cP)(cP)(cP):::: ::::ChloridesChloridesChloridesChlorides (ppm)(ppm)(ppm)(ppm) WeightWeightWeightWeight (ppg)(ppg)(ppg)(ppg)8.80 ViscosityViscosityViscosityViscosity (spqt)(spqt)(spqt)(spqt)42.00 7 (lhf2)(lhf2)(lhf2)(lhf2)::::28.00:::::::: :::::::: % Oil% Oil% Oil% Oil(pH)(pH)(pH)(pH)pHpHpHpH 1500 Max TempMax TempMax TempMax Temp (degF)(degF)(degF)(degF)102.56 (%)(%)(%)(%)3.40 ::::0.25 ::::10.20 Fluid LossFluid LossFluid LossFluid Loss (mptm)(mptm)(mptm)(mptm)17 (%)(%)(%)(%)::::0.00 O:WO:WO:WO:W N:A:::::::: MWD PerformanceMWD PerformanceMWD PerformanceMWD Performance :::::::::::::::: :::::::::::: Tool ODTool ODTool ODTool OD (in)(in)(in)(in)8 TypeTypeTypeType P4M Min. Inc.Min. Inc.Min. Inc.Min. Inc.(deg)(deg)(deg)(deg)2.13 Min. Inc. DepthMin. Inc. DepthMin. Inc. DepthMin. Inc. Depth (ft)(ft)(ft)(ft)257.11 :::::::: Final Az.Final Az.Final Az.Final Az.(deg)(deg)(deg)(deg)259.44 Max Op. Press.Max Op. Press.Max Op. Press.Max Op. Press.(psig)(psig)(psig)(psig)560 Max. Inc.Max. Inc.Max. Inc.Max. Inc.(deg)(deg)(deg)(deg)30.63 Max. Inc. DepthMax. Inc. DepthMax. Inc. DepthMax. Inc. Depth (ft)(ft)(ft)(ft)1167.23 MWD Real Time %MWD Real Time %MWD Real Time %MWD Real Time %98 MWD Recorded %MWD Recorded %MWD Recorded %MWD Recorded %100 CommentsCommentsCommentsComments Drilled Surface Hole to 9-5/8" casing point @ 1208' MD / 1159' TVD. POOH to run casing. Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 6 Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 7 Bit Run SummaryBit Run SummaryBit Run SummaryBit Run Summary Run Time DataRun Time DataRun Time DataRun Time Data MWD RunMWD RunMWD RunMWD Run ::::300 Run StartRun StartRun StartRun Start 19-Feb-12 22:56 BRT HrsBRT HrsBRT HrsBRT Hrs ::::82.07 Circ. HrsCirc. HrsCirc. HrsCirc. Hrs 46.67:::::::: ::::::::Rig Bit NoRig Bit NoRig Bit NoRig Bit No ::::3 Run EndRun EndRun EndRun End 23-Feb-12 09:00 Hole SizeHole SizeHole SizeHole Size (in)(in)(in)(in)::::8.5 Oper. HrsOper. HrsOper. HrsOper. Hrs 82.25 Drilling DataDrilling DataDrilling DataDrilling Data Start DepthStart DepthStart DepthStart Depth (ft)(ft)(ft)(ft)::::1208.00 FootageFootageFootageFootage (ft)(ft)(ft)(ft)::::2218.00 Avg WOBAvg WOBAvg WOBAvg WOB (klb)(klb)(klb)(klb)::::18.0 Avg ROPAvg ROPAvg ROPAvg ROP (fph)(fph)(fph)(fph)::::115.00 End DepthEnd DepthEnd DepthEnd Depth (ft)(ft)(ft)(ft)::::3426.00 Avg Flow RateAvg Flow RateAvg Flow RateAvg Flow Rate(gpm)(gpm)(gpm)(gpm)::::475 Avg TOBAvg TOBAvg TOBAvg TOB (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::15000 Avg SPPAvg SPPAvg SPPAvg SPP (psig)(psig)(psig)(psig)::::1600 Drilling HrsDrilling HrsDrilling HrsDrilling Hrs (hr)(hr)(hr)(hr)::::19.979 Avg RPMAvg RPMAvg RPMAvg RPM (rpm)(rpm)(rpm)(rpm)::::60 Avg BendAvg BendAvg BendAvg Bend (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::NA Mud DataMud DataMud DataMud Data Mud TypeMud TypeMud TypeMud Type ::::Polymer % Sand% Sand% Sand% Sand (%)(%)(%)(%) YPYPYPYP % Solids% Solids% Solids% Solids PVPVPVPV (cP)(cP)(cP)(cP):::: ::::ChloridesChloridesChloridesChlorides (ppm)(ppm)(ppm)(ppm) WeightWeightWeightWeight (ppg)(ppg)(ppg)(ppg)9.30 ViscosityViscosityViscosityViscosity (spqt)(spqt)(spqt)(spqt)52.00 16 (lhf2)(lhf2)(lhf2)(lhf2)::::19.00:::::::: :::::::: % Oil% Oil% Oil% Oil(pH)(pH)(pH)(pH)pHpHpHpH 800 Max TempMax TempMax TempMax Temp (degF)(degF)(degF)(degF)102.56 (%)(%)(%)(%)5.90 ::::0.25 ::::9.00 Fluid LossFluid LossFluid LossFluid Loss (mptm)(mptm)(mptm)(mptm)6 (%)(%)(%)(%)::::0.00 O:WO:WO:WO:W N:A:::::::: MWD PerformanceMWD PerformanceMWD PerformanceMWD Performance :::::::::::::::: :::::::::::: Tool ODTool ODTool ODTool OD (in)(in)(in)(in)6.72 TypeTypeTypeType P4M Min. Inc.Min. Inc.Min. Inc.Min. Inc.(deg)(deg)(deg)(deg)30.63 Min. Inc. DepthMin. Inc. DepthMin. Inc. DepthMin. Inc. Depth (ft)(ft)(ft)(ft)1167.23 :::::::: Final Az.Final Az.Final Az.Final Az.(deg)(deg)(deg)(deg)261.00 Max Op. Press.Max Op. Press.Max Op. Press.Max Op. Press.(psig)(psig)(psig)(psig)1138 Max. Inc.Max. Inc.Max. Inc.Max. Inc.(deg)(deg)(deg)(deg)76.31 Max. Inc. DepthMax. Inc. DepthMax. Inc. DepthMax. Inc. Depth (ft)(ft)(ft)(ft)3350.73 MWD Real Time %MWD Real Time %MWD Real Time %MWD Real Time %98 MWD Recorded %MWD Recorded %MWD Recorded %MWD Recorded %100 CommentsCommentsCommentsComments Drill Intermediate Section to Casing Point @ 3426' MD / 2256'TVD, POOH to run 7" Casing Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 8 Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 9 Bit Run SummaryBit Run SummaryBit Run SummaryBit Run Summary Run Time DataRun Time DataRun Time DataRun Time Data MWD RunMWD RunMWD RunMWD Run ::::400 Run StartRun StartRun StartRun Start 25-Feb-12 00:00 BRT HrsBRT HrsBRT HrsBRT Hrs ::::90.33 Circ. HrsCirc. HrsCirc. HrsCirc. Hrs 63.80:::::::: ::::::::Rig Bit NoRig Bit NoRig Bit NoRig Bit No ::::4 Run EndRun EndRun EndRun End 28-Feb-12 18:20 Hole SizeHole SizeHole SizeHole Size (in)(in)(in)(in)::::6.125 Oper. HrsOper. HrsOper. HrsOper. Hrs 90.64 Drilling DataDrilling DataDrilling DataDrilling Data Start DepthStart DepthStart DepthStart Depth (ft)(ft)(ft)(ft)::::3426.00 FootageFootageFootageFootage (ft)(ft)(ft)(ft)::::849.00 Avg WOBAvg WOBAvg WOBAvg WOB (klb)(klb)(klb)(klb)::::15.0 Avg ROPAvg ROPAvg ROPAvg ROP (fph)(fph)(fph)(fph)::::20.00 End DepthEnd DepthEnd DepthEnd Depth (ft)(ft)(ft)(ft)::::4275.00 Avg Flow RateAvg Flow RateAvg Flow RateAvg Flow Rate(gpm)(gpm)(gpm)(gpm)::::200 Avg TOBAvg TOBAvg TOBAvg TOB (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::3000 Avg SPPAvg SPPAvg SPPAvg SPP (psig)(psig)(psig)(psig)::::1200 Drilling HrsDrilling HrsDrilling HrsDrilling Hrs (hr)(hr)(hr)(hr)::::43.028 Avg RPMAvg RPMAvg RPMAvg RPM (rpm)(rpm)(rpm)(rpm)::::40 Avg BendAvg BendAvg BendAvg Bend (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::NA Mud DataMud DataMud DataMud Data Mud TypeMud TypeMud TypeMud Type ::::Polymer % Sand% Sand% Sand% Sand (%)(%)(%)(%) YPYPYPYP % Solids% Solids% Solids% Solids PVPVPVPV (cP)(cP)(cP)(cP):::: ::::ChloridesChloridesChloridesChlorides (ppm)(ppm)(ppm)(ppm) WeightWeightWeightWeight (ppg)(ppg)(ppg)(ppg)8.80 ViscosityViscosityViscosityViscosity (spqt)(spqt)(spqt)(spqt)65.00 15 (lhf2)(lhf2)(lhf2)(lhf2)::::25.00:::::::: :::::::: % Oil% Oil% Oil% Oil(pH)(pH)(pH)(pH)pHpHpHpH 28000 Max TempMax TempMax TempMax Temp (degF)(degF)(degF)(degF)88.52 (%)(%)(%)(%)0.80 ::::0.10 ::::9.00 Fluid LossFluid LossFluid LossFluid Loss (mptm)(mptm)(mptm)(mptm)5 (%)(%)(%)(%)::::0.00 O:WO:WO:WO:W N:A:::::::: MWD PerformanceMWD PerformanceMWD PerformanceMWD Performance :::::::::::::::: :::::::::::: Tool ODTool ODTool ODTool OD (in)(in)(in)(in)4.75 TypeTypeTypeType P4M Min. Inc.Min. Inc.Min. Inc.Min. Inc.(deg)(deg)(deg)(deg)77.74 Min. Inc. DepthMin. Inc. DepthMin. Inc. DepthMin. Inc. Depth (ft)(ft)(ft)(ft)3442.81 :::::::: Final Az.Final Az.Final Az.Final Az.(deg)(deg)(deg)(deg)255.22 Max Op. Press.Max Op. Press.Max Op. Press.Max Op. Press.(psig)(psig)(psig)(psig)2872 Max. Inc.Max. Inc.Max. Inc.Max. Inc.(deg)(deg)(deg)(deg)90.43 Max. Inc. DepthMax. Inc. DepthMax. Inc. DepthMax. Inc. Depth (ft)(ft)(ft)(ft)3916.89 MWD Real Time %MWD Real Time %MWD Real Time %MWD Real Time %98 MWD Recorded %MWD Recorded %MWD Recorded %MWD Recorded %100 CommentsCommentsCommentsComments Drill Production Section to 4275' MD / 2326' TVD, POOH to change bit Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 10 Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 11 Bit Run SummaryBit Run SummaryBit Run SummaryBit Run Summary Run Time DataRun Time DataRun Time DataRun Time Data MWD RunMWD RunMWD RunMWD Run ::::500 Run StartRun StartRun StartRun Start 29-Feb-12 05:00 BRT HrsBRT HrsBRT HrsBRT Hrs ::::56.33 Circ. HrsCirc. HrsCirc. HrsCirc. Hrs 34.44:::::::: ::::::::Rig Bit NoRig Bit NoRig Bit NoRig Bit No ::::5 Run EndRun EndRun EndRun End 02-Mar-12 13:20 Hole SizeHole SizeHole SizeHole Size (in)(in)(in)(in)::::6.125 Oper. HrsOper. HrsOper. HrsOper. Hrs 56.65 Drilling DataDrilling DataDrilling DataDrilling Data Start DepthStart DepthStart DepthStart Depth (ft)(ft)(ft)(ft)::::4275.00 FootageFootageFootageFootage (ft)(ft)(ft)(ft)::::433.00 Avg WOBAvg WOBAvg WOBAvg WOB (klb)(klb)(klb)(klb)::::15.0 Avg ROPAvg ROPAvg ROPAvg ROP (fph)(fph)(fph)(fph)::::40.00 End DepthEnd DepthEnd DepthEnd Depth (ft)(ft)(ft)(ft)::::4708.00 Avg Flow RateAvg Flow RateAvg Flow RateAvg Flow Rate(gpm)(gpm)(gpm)(gpm)::::210 Avg TOBAvg TOBAvg TOBAvg TOB (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::5300 Avg SPPAvg SPPAvg SPPAvg SPP (psig)(psig)(psig)(psig)::::1600 Drilling HrsDrilling HrsDrilling HrsDrilling Hrs (hr)(hr)(hr)(hr)::::10.370 Avg RPMAvg RPMAvg RPMAvg RPM (rpm)(rpm)(rpm)(rpm)::::70 Avg BendAvg BendAvg BendAvg Bend (ft-lb)(ft-lb)(ft-lb)(ft-lb)::::NA Mud DataMud DataMud DataMud Data Mud TypeMud TypeMud TypeMud Type ::::Polymer % Sand% Sand% Sand% Sand (%)(%)(%)(%) YPYPYPYP % Solids% Solids% Solids% Solids PVPVPVPV (cP)(cP)(cP)(cP):::: ::::ChloridesChloridesChloridesChlorides (ppm)(ppm)(ppm)(ppm) WeightWeightWeightWeight (ppg)(ppg)(ppg)(ppg)8.80 ViscosityViscosityViscosityViscosity (spqt)(spqt)(spqt)(spqt)50.00 15 (lhf2)(lhf2)(lhf2)(lhf2)::::18.00:::::::: :::::::: % Oil% Oil% Oil% Oil(pH)(pH)(pH)(pH)pHpHpHpH 32000 Max TempMax TempMax TempMax Temp (degF)(degF)(degF)(degF)78.00 (%)(%)(%)(%)1.20 ::::1.00 ::::10.00 Fluid LossFluid LossFluid LossFluid Loss (mptm)(mptm)(mptm)(mptm)5 (%)(%)(%)(%)::::0.00 O:WO:WO:WO:W N:A:::::::: MWD PerformanceMWD PerformanceMWD PerformanceMWD Performance :::::::::::::::: :::::::::::: Tool ODTool ODTool ODTool OD (in)(in)(in)(in)4.75 TypeTypeTypeType PPM Min. Inc.Min. Inc.Min. Inc.Min. Inc.(deg)(deg)(deg)(deg)83.88 Min. Inc. DepthMin. Inc. DepthMin. Inc. DepthMin. Inc. Depth (ft)(ft)(ft)(ft)4326.05 :::::::: Final Az.Final Az.Final Az.Final Az.(deg)(deg)(deg)(deg)250.16 Max Op. Press.Max Op. Press.Max Op. Press.Max Op. Press.(psig)(psig)(psig)(psig)2528 Max. Inc.Max. Inc.Max. Inc.Max. Inc.(deg)(deg)(deg)(deg)87.18 Max. Inc. DepthMax. Inc. DepthMax. Inc. DepthMax. Inc. Depth (ft)(ft)(ft)(ft)4444.20 MWD Real Time %MWD Real Time %MWD Real Time %MWD Real Time %98 MWD Recorded %MWD Recorded %MWD Recorded %MWD Recorded %100 CommentsCommentsCommentsComments Drill production section to TD at 4708' MD / 2342' TVD, POOH to run Liner. Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 12 Job No:Job No:Job No:Job No:AK-XX-0008370345 Well Name:Well Name:Well Name:Well Name:Walakpa 11 End of Well ReportEnd of Well ReportEnd of Well ReportEnd of Well Report Page 13 RE F E R E N C E I N F O R M A T I O N Co - o r d i n a t e ( N / E ) R e f e r e n c e : W e l l W a l a k p a 1 1 , T r u e N o r t h Ve r t i c a l ( T V D ) R e f e r e n c e : K u u k p i k 5 A c t u a l @ 5 4 . 7 0 f t ( 3 1 . 7 G L - M S L / 2 3 . 0 K B ) Se c t i o n ( V S ) R e f e r e n c e : S l o t - ( 0 . 0 0 N , 0 . 0 0 E ) Me a s u r e d D e p t h R e f e r e n c e : Ku u k p i k 5 A c t u a l @ 5 4 . 7 0 f t ( 3 1 . 7 G L - M S L / 2 3 . 0 K B ) Ca l c u l a t i o n M e t h o d : Mi n i m u m C u r v a t u r e Wa l a k p a 1 1 No r t h i n g 6 2 4 3 1 5 9 . 5 5 Ea s t i n g 6 3 1 5 5 2 . 7 2 La t i t u d e 7 1 . 0 7 2 2 7 7 Lo n g i t u d e - 1 5 6 . 8 9 2 7 7 0 NA D 1 9 2 7 ( N A D C O N C O N U S ) A l a s k a Z o n e 0 6 Wa l a k p a # 1 1 5.935 DD I < 6 . 0 : Re l a t i v e l y S h o r t , s i m p l e w e l l s o r s i m p l e p r o f i l e s w i t h l o w t o r t u o s i t y DD I 6 . 0 - 6 . 4 : Sh o r t e r w e l l s w i t h h i g h t o r t u o s i t y o r l o n g e r w e l l s w i t h l o w t o r t u o s i t y DD I 6 . 4 - 6 . 8 : Lo n g w e l l s w i t h r e l a t i v e l y t o r t u o u s p r o f i l e s DD I > 6 . 8 : L o n g , t o r t u o u s p r o f i l e s w i t h h i g h d e g r e e o f d i f f i c u l t y Halliburton Ener gy Services Sperry Drilling Services Survey Management Alaska FO - A K - S D S - S M 4 6 2 Cr e a t e d b y : St e v e P a r k i n s o n Revision by:Avinash Ramjit 21.Oct.2009 Pr o j e c t : W a l a k p a Z o n e 6 Si t e : W a l a k p a We l l : W a l a k p a 1 1 We l l b o r e : W a l a k p a # 1 1 De s i g n : W a l a k p a # 1 1 -3 5 0 0 35 0 70 0 10 5 0 14 0 0 17 5 0 21 0 0 24 5 0 T r u e V e r t i c a l D e p t h -5 0 0 - 2 5 0 0 2 5 0 5 0 0 7 5 0 1 0 0 0 1 2 5 0 1 5 0 0 1 7 5 0 2 0 0 0 2 2 5 0 2 5 0 0 2 7 5 0 3 0 0 0 3 2 5 0 3 500 3750 4000 Ve r t i c a l S e c t i o n a t 2 5 5 . 1 6 ° 9 5 / 8 " 7" 10 0 0 20 0 0 30 0 0 40 0 0 4708 Walakpa #11 Di r e c t i o n a l D i f f i c u l t y I n d e x 12 April, 2012 Walakpa Zone 6 Walakpa Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Petrotechnical Resources of Alaska / North Slope Walakpa Zone 6 Walakpa Halliburton Company Definitive Survey Report Well: Wellbore: Walakpa 11 Walakpa #11 Survey Calculation Method:Minimum Curvature Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K Design:Walakpa #11 Database:.Compass AK PRD 2003.16 MD Reference:Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K North Reference: Well Walakpa 11 True Map System: Geo Datum: Project Map Zone: System Datum:US State Plane 1927 (Exact solution) NAD 1927 (NADCON CONUS) Walakpa Zone 6 Alaska Zone 06 Mean Sea Level Using Well Reference Point Using geodetic scale factor Well Well Position Longitude: Latitude: Easting: Northing: ft +E/-W +N/-S Position Uncertainty ft ft ftGround Level: Walakpa 11 ft ft 0.00 0.00 6,243,159.55 631,552.72 31.70Wellhead Elevation:0.00 ft0.00 71.072277 -156.892770 Wellbore Declination (°) Field Strength (nT) Sample Date Dip Angle (°) Walakpa #11 Model NameMagnetics BGGM2011 2/16/2012 18 81 57,528 Phase:Version: Audit Notes: Design Walakpa #11 1.0 ACTUAL Vertical Section: Depth From (TVD) (ft) +N/-S (ft) Direction (°) +E/-W (ft) Tie On Depth:23.00 255.160.000.0023.00 From (ft) Survey Program DescriptionTool NameSurvey (Wellbore) To (ft) Date 4/12/2012 Survey Start Date SRG-GYRO-SS Conventional SRG single shots50.00 168.00 Walakpa #11 Gyro (Walakpa #11)02/17/2012 MWD+SC Fixed:v2:standard dec & axial correction168.00 1,193.00 Walakpa #11 MWD+SC (Walakpa #11)02/17/2012 MWD MWD - Standard1,193.00 3,415.00 Walakpa #11 MWD (Walakpa #11)04/12/2012 MWD MWD - Standard3,415.00 4,632.00 Walakpa #11 MWD (Walakpa #11)04/12/2012 MD (ft) Inc (°) Azi (°) +E/-W (ft) +N/-S (ft) Survey TVD (ft) TVDSS (ft) Map Northing (ft) Map Easting (ft) Vertical Section (ft) DLS (°/100')Survey Tool Name 23.00 0.00 0.00 23.00 0.00 0.00-31.70 6,243,159.55 631,552.72 0.00 0.00 UNDEFINED 50.00 0.26 254.01 50.00 -0.02 -0.06-4.70 6,243,159.53 631,552.66 0.96 0.06 SRG-GYRO-SS (1) 111.00 0.69 287.56 111.00 0.06 -0.5456.30 6,243,159.60 631,552.18 0.81 0.51 SRG-GYRO-SS (1) 143.00 0.78 280.58 143.00 0.15 -0.9488.30 6,243,159.69 631,551.78 0.40 0.87 SRG-GYRO-SS (1) 168.10 0.75 268.77 168.09 0.18 -1.27113.39 6,243,159.71 631,551.44 0.64 1.18 SRG-GYRO-SS (1) 257.11 3.09 254.64 257.05 -0.47 -4.17202.35 6,243,159.01 631,548.56 2.66 4.15 MWD+SC (2) 319.24 4.76 254.43 319.03 -1.60 -8.27264.33 6,243,157.80 631,544.48 2.69 8.40 MWD+SC (2) 381.00 6.51 251.51 380.49 -3.40 -14.06325.79 6,243,155.89 631,538.73 2.87 14.46 MWD+SC (2) 442.65 7.08 250.50 441.71 -5.78 -20.95387.01 6,243,153.39 631,531.88 0.94 21.73 MWD+SC (2) 504.59 8.44 253.05 503.08 -8.38 -28.90448.38 6,243,150.65 631,523.98 2.26 30.08 MWD+SC (2) 566.79 10.66 256.81 564.41 -11.02 -38.87509.71 6,243,147.82 631,514.06 3.71 40.39 MWD+SC (2) 4/12/2012 12:09:41PM COMPASS 2003.16 Build 73 Page 2 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Petrotechnical Resources of Alaska / North Slope Walakpa Zone 6 Walakpa Halliburton Company Definitive Survey Report Well: Wellbore: Walakpa 11 Walakpa #11 Survey Calculation Method:Minimum Curvature Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K Design:Walakpa #11 Database:.Compass AK PRD 2003.16 MD Reference:Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K North Reference: Well Walakpa 11 True MD (ft) Inc (°) Azi (°) +E/-W (ft) +N/-S (ft) Survey TVD (ft) TVDSS (ft) Map Northing (ft) Map Easting (ft) Vertical Section (ft) DLS (°/100')Survey Tool Name 627.67 13.18 257.43 623.97 -13.82 -51.13569.27 6,243,144.80 631,501.86 4.14 52.96 MWD+SC (2) 688.21 15.23 258.23 682.66 -16.94 -65.65627.96 6,243,141.41 631,487.40 3.40 67.80 MWD+SC (2) 752.16 16.59 257.63 744.16 -20.61 -82.79689.46 6,243,137.43 631,470.33 2.14 85.31 MWD+SC (2) 816.02 17.37 256.69 805.23 -24.76 -100.97750.53 6,243,132.95 631,452.23 1.29 103.94 MWD+SC (2) 878.17 19.69 256.10 864.16 -29.41 -120.17809.46 6,243,127.95 631,433.12 3.75 123.69 MWD+SC (2) 939.01 22.75 256.79 920.87 -34.56 -141.57866.17 6,243,122.41 631,411.81 5.05 145.70 MWD+SC (2) 1,006.02 24.87 257.88 982.17 -40.48 -167.97927.47 6,243,116.01 631,385.53 3.23 172.73 MWD+SC (2) 1,071.40 27.52 259.05 1,040.83 -46.24 -196.24986.13 6,243,109.74 631,357.37 4.13 201.54 MWD+SC (2) 1,133.03 28.53 259.86 1,095.23 -51.53 -224.711,040.53 6,243,103.92 631,329.01 1.75 230.41 MWD+SC (2) 1,167.23 30.63 259.44 1,124.97 -54.57 -241.321,070.27 6,243,100.58 631,312.46 6.17 247.24 MWD+SC (2) 1,238.65 31.94 259.80 1,186.01 -61.25 -277.801,131.31 6,243,093.24 631,276.11 1.85 284.22 MWD (3) 1,302.87 33.45 260.10 1,240.05 -67.30 -311.951,185.35 6,243,086.56 631,242.07 2.36 318.79 MWD (3) 1,365.20 35.36 261.54 1,291.48 -72.91 -346.721,236.78 6,243,080.32 631,207.42 3.33 353.83 MWD (3) 1,427.74 37.53 261.18 1,341.78 -78.49 -383.451,287.08 6,243,074.07 631,170.80 3.49 390.76 MWD (3) 1,492.46 39.67 259.55 1,392.36 -85.26 -423.251,337.66 6,243,066.57 631,131.14 3.66 430.97 MWD (3) 1,556.18 41.51 257.70 1,440.75 -93.45 -463.881,386.05 6,243,057.64 631,090.66 3.45 472.35 MWD (3) 1,617.51 43.38 257.06 1,486.00 -102.50 -504.271,431.30 6,243,047.86 631,050.45 3.13 513.70 MWD (3) 1,682.14 45.19 256.41 1,532.27 -112.85 -548.191,477.57 6,243,036.70 631,006.73 2.89 558.81 MWD (3) 1,745.81 47.81 257.24 1,576.09 -123.37 -593.161,521.39 6,243,025.37 630,961.96 4.22 604.97 MWD (3) 1,808.87 50.23 257.44 1,617.44 -133.80 -639.601,562.74 6,243,014.09 630,915.72 3.85 652.54 MWD (3) 1,873.02 52.20 257.47 1,657.63 -144.66 -688.411,602.93 6,243,002.34 630,867.12 3.07 702.50 MWD (3) 1,936.48 55.07 256.69 1,695.25 -156.10 -738.211,640.55 6,242,990.00 630,817.54 4.63 753.57 MWD (3) 1,999.04 57.35 256.10 1,730.04 -168.33 -788.741,675.34 6,242,976.85 630,767.25 3.73 805.55 MWD (3) 2,061.20 59.09 256.77 1,762.78 -180.72 -840.111,708.08 6,242,963.52 630,716.12 2.95 858.37 MWD (3) 2,124.91 61.63 256.95 1,794.28 -193.30 -894.031,739.58 6,242,949.95 630,662.45 3.99 913.72 MWD (3) 2,189.64 64.29 257.00 1,823.71 -206.30 -950.191,769.01 6,242,935.94 630,606.53 4.11 971.34 MWD (3) 2,251.70 67.12 258.33 1,849.24 -218.37 -1,005.441,794.54 6,242,922.85 630,551.52 4.96 1,027.84 MWD (3) 2,314.61 68.97 258.58 1,872.76 -230.05 -1,062.611,818.06 6,242,910.14 630,494.58 2.96 1,086.09 MWD (3) 2,379.12 68.92 258.25 1,895.93 -242.14 -1,121.591,841.23 6,242,896.97 630,435.84 0.48 1,146.19 MWD (3) 2,442.70 68.77 257.96 1,918.88 -254.36 -1,179.611,864.18 6,242,883.69 630,378.05 0.49 1,205.41 MWD (3) 2,505.98 68.52 257.74 1,941.92 -266.76 -1,237.221,887.22 6,242,870.24 630,320.68 0.51 1,264.28 MWD (3) 2,570.01 68.75 257.42 1,965.25 -279.59 -1,295.461,910.55 6,242,856.35 630,262.69 0.59 1,323.86 MWD (3) 2,631.48 69.02 257.31 1,987.39 -292.13 -1,351.411,932.69 6,242,842.79 630,206.98 0.47 1,381.16 MWD (3) 2,694.89 68.84 257.28 2,010.19 -305.15 -1,409.131,955.49 6,242,828.72 630,149.51 0.29 1,440.29 MWD (3) 2,759.16 68.78 257.13 2,033.42 -318.42 -1,467.571,978.72 6,242,814.39 630,091.33 0.24 1,500.17 MWD (3) 2,822.12 68.37 256.35 2,056.42 -331.86 -1,524.622,001.72 6,242,799.91 630,034.55 1.32 1,558.76 MWD (3) 2,885.23 68.07 256.25 2,079.84 -345.74 -1,581.552,025.14 6,242,784.99 629,977.88 0.50 1,617.35 MWD (3) 2,949.98 67.91 256.14 2,104.10 -360.06 -1,639.852,049.40 6,242,769.60 629,919.86 0.29 1,677.37 MWD (3) 3,012.83 68.33 257.19 2,127.52 -373.51 -1,696.602,072.82 6,242,755.12 629,863.37 1.69 1,735.68 MWD (3) 3,076.03 68.07 256.91 2,151.00 -386.66 -1,753.792,096.30 6,242,740.93 629,806.44 0.58 1,794.32 MWD (3) 4/12/2012 12:09:41PM COMPASS 2003.16 Build 73 Page 3 Project: Company: Local Co-ordinate Reference: TVD Reference: Site: Petrotechnical Resources of Alaska / North Slope Walakpa Zone 6 Walakpa Halliburton Company Definitive Survey Report Well: Wellbore: Walakpa 11 Walakpa #11 Survey Calculation Method:Minimum Curvature Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K Design:Walakpa #11 Database:.Compass AK PRD 2003.16 MD Reference:Kuukpik 5 Actual @ 54.70ft (31.7 GL-MSL / 23.0 K North Reference: Well Walakpa 11 True MD (ft) Inc (°) Azi (°) +E/-W (ft) +N/-S (ft) Survey TVD (ft) TVDSS (ft) Map Northing (ft) Map Easting (ft) Vertical Section (ft) DLS (°/100')Survey Tool Name 3,140.47 67.92 257.04 2,175.14 -400.13 -1,811.992,120.44 6,242,726.40 629,748.49 0.30 1,854.04 MWD (3) 3,202.56 69.46 257.31 2,197.70 -412.97 -1,868.392,143.00 6,242,712.53 629,692.34 2.51 1,911.85 MWD (3) 3,264.31 72.01 258.82 2,218.08 -425.02 -1,925.422,163.38 6,242,699.45 629,635.54 4.73 1,970.06 MWD (3) 3,328.98 75.09 260.84 2,236.39 -435.96 -1,986.462,181.69 6,242,687.39 629,574.72 5.63 2,031.86 MWD (3) 3,350.73 76.31 261.10 2,241.76 -439.26 -2,007.272,187.06 6,242,683.71 629,553.97 5.73 2,052.83 MWD (3) 3,442.81 77.74 261.26 2,262.44 -453.02 -2,095.942,207.74 6,242,668.33 629,465.58 1.56 2,142.06 MWD (4) 3,505.04 79.57 262.41 2,274.68 -461.69 -2,156.332,219.98 6,242,658.57 629,405.36 3.45 2,202.66 MWD (4) 3,566.87 83.63 260.85 2,283.71 -470.59 -2,216.832,229.01 6,242,648.56 629,345.04 7.02 2,263.42 MWD (4) 3,629.35 85.74 258.01 2,289.50 -482.00 -2,277.982,234.80 6,242,636.03 629,284.12 5.65 2,325.45 MWD (4) 3,690.24 86.79 256.78 2,293.46 -495.26 -2,337.272,238.76 6,242,621.69 629,225.08 2.65 2,386.16 MWD (4) 3,752.33 86.23 257.01 2,297.24 -509.32 -2,397.632,242.54 6,242,606.54 629,164.99 0.97 2,448.11 MWD (4) 3,813.70 89.39 255.74 2,299.59 -523.76 -2,457.222,244.89 6,242,591.01 629,105.68 5.55 2,509.41 MWD (4) 3,875.19 87.78 256.36 2,301.11 -538.58 -2,516.882,246.41 6,242,575.10 629,046.31 2.81 2,570.87 MWD (4) 3,916.89 90.43 255.11 2,301.76 -548.85 -2,557.282,247.06 6,242,564.09 629,006.10 7.03 2,612.56 MWD (4) 3,939.93 90.19 255.05 2,301.63 -554.78 -2,579.552,246.93 6,242,557.75 628,983.95 1.07 2,635.60 MWD (4) 4,002.38 88.39 254.07 2,302.41 -571.41 -2,639.742,247.71 6,242,540.03 628,924.08 3.28 2,698.04 MWD (4) 4,065.44 86.17 254.46 2,305.40 -588.49 -2,700.362,250.70 6,242,521.85 628,863.78 3.57 2,761.02 MWD (4) 4,128.16 83.88 255.45 2,310.84 -604.71 -2,760.702,256.14 6,242,504.53 628,803.76 3.98 2,823.50 MWD (4) 4,192.64 84.00 255.22 2,317.64 -620.94 -2,822.732,262.94 6,242,487.17 628,742.04 0.40 2,887.62 MWD (4) 4,250.74 83.88 255.82 2,323.78 -635.39 -2,878.672,269.08 6,242,471.70 628,686.38 1.05 2,945.39 MWD (4) 4,317.76 85.02 256.49 2,330.26 -651.35 -2,943.432,275.56 6,242,454.56 628,621.92 1.97 3,012.08 MWD (4) 4,382.38 85.94 256.10 2,335.35 -666.61 -3,006.022,280.65 6,242,438.16 628,559.63 1.55 3,076.49 MWD (4) 4,444.20 87.18 253.91 2,339.06 -682.58 -3,065.622,284.36 6,242,421.11 628,500.33 4.07 3,138.19 MWD (4) 4,509.01 86.37 252.07 2,342.71 -701.50 -3,127.492,288.01 6,242,401.06 628,438.82 3.10 3,202.85 MWD (4) 4,571.10 85.94 253.05 2,346.87 -720.07 -3,186.602,292.17 6,242,381.41 628,380.07 1.72 3,264.74 MWD (4) 4,631.69 85.32 250.16 2,351.49 -739.13 -3,243.922,296.79 6,242,361.31 628,323.12 4.86 3,325.03 MWD (4) 4,708.00 85.32 250.16 2,357.72 -764.95 -3,315.462,303.02 6,242,334.19 628,252.06 0.00 3,400.79 PROJECTED to TD 4/12/2012 12:09:41PM COMPASS 2003.16 Build 73 Page 4 Directional Drilling After Action Review Employee Name: Mark Brouillet Date: 3-3-2012 Well: Walakpa 11 Hole Section: 12-1/4” Surface What went as, or better than, planned: The section went very well with low dogleg rates and good wellbore placement. Slide percentage was kept low This section greatly reduced the slide percentage and dogleg rate for the intermediate section. Due to improvements to the directional plan by the sperry well planner and directional driller on location. Difficulties experienced: No difficulties experienced on this surface hole Recommendations: No recommendations needed the section was drilled very efficiently Innovations and/or cost savings: Surface bit used was a re-run from the last well saving the cost of a new 12-1/4” milltooth. BHA components laid down with minimal breaks saved 1 hr rig time. LMWD AAR Page 1 REV 2 L/MWD After Action Review Well: Walakpa 11 Hole Section: 12.25" Surface Employee Name: Lucas Smith Date: 2/16/2012 What went as, or better than, planned: Excellent surface detection. Difficulties experienced: Logistical issues resulted in the entire surface hole being drilled without a back up Gamma / Res tool on location. Sperry's standard practice is to have a primary and back up on location for the current hole section. If an issue had arose where our only tool on location had malfunctioned the operation would have come to a halt. Recommendations: Have back up Logistical options with pricing already established so that if your primary logistical means is not able to be utilized, a back up plan can quickly be set into motion with minimal delay. Maintain the practice of keeping tools on location so that in the event of weather related logistical issues we have the tools we need to move the operation forward. Innovations and/or cost savings: Pulser was stuffed and pulled in the pipe shed saving 1 hr of rig time. 48+ hrs of time was saved by keeping unused tools on location. Had they been sent in we would have had no tools on location to drill surface hole and the entire operation would have been on hold due to our inability to transport tools via cargo aircraft. A rollagon would have been chartered to transport the tools from Deadhorse to Barrow which is a 48+ hour trip one way. Directional Drilling After Action Review Employee Name: Mark Brouillet Date: 3-3-2012 Well: Walakpa 11 Hole Section: 8-1/2” Intermediate What went as, or better than, planned: Section went extremely well. Dogleg rates were lower then planned with good wellbore placement. Slide percentage was 27% lowest percentage of any of the intermediate sections drilled in the 2012 Barrow gas fields project. Section drilled under planned time Difficulties experienced: No difficulty experienced improvements were made on this section Recommendations: Continue adjusting the directional plan attempting to lower the dogleg rates even farther for the next well Innovations and/or cost savings: Drilled the section efficiently under depth vs. days time saving many hrs of rig time LMWD AAR Page 1 REV 2 L/MWD After Action Review Well: Walakpa 11 Hole Section: 8.5" Intermediate Employee Name: Joe Granados Date: 2/22/2012 What went as, or better than, planned: Drilled the section in only one run, Good Detection during the run. Difficulties experienced: The Same logistical issues that prevented the surface section from being drilled without back up Gamma / Res Tool, also affected our ability to have a back up Gamma / Res sting for our Intermediate section. Once again, if an issue had arose where our only tool on location had malfunctioned the operation would have come to a halt. Recommendations: If weather or mechanical issues prevent the use of the primary means of shipping tools to the location, have alternate means of transport in place that would enable tools to get to location in time to be prepped for the drilling run. Innovations and/or cost savings: Pulser was stuffed and pulled in the pipe shed saving 1 hr of rig time. Keeping tools on location prevented the entire operation from coming to a dead stop due to lack of tools. Directional Drilling After Action Review Employee Name: Mark Brouillet Date: 3-3-2012 Well: Walakpa 11 Hole Section: 6-1/8” Production What went as, or better than, planned: The production section was drilled with a motor which had not been done on previous wells. Good weight transfer was available. Motor with ABI worked well with good ABI detection on both BHA’s run. ECD’s were kept low. Difficulties experienced: Slow ROP while drilling out of the 7” casing until reaching the pay zone. Bit trip do to 47.04 drilling hrs. Assembly unable to achieve sidetrack. Recommendations: PDC bit would improve ROP and save a bit trip due to hrs and K-revs Innovations and/or cost savings: No cost savings realized on this section. Mainly due to unplanned trip for bit. LMWD AAR Page 1 REV 2 L/MWD After Action Review Well: Walakpa 11 Hole Section: 6.125" Production Employee Name: Lucas Smith Date: 2-28-2012 What went as, or better than, planned: Surface detection was clear and with strong pulse amplitude. Difficulties experienced: ROP was not recorded during R100 due to connectivity issues between the database and PASON. Realtime data was not recorded at the beginning of Run 400 due to a dual computer hardware failure. SAG not utilized during R500 due to greater than expected inclination corrections. Recommendations: Innovations and/or cost savings: Pulser was stuffed and pulled in the pipe shed saving 2 hrs of rig time.