Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-116FROM: Sandra D. Lemke, ATO -704
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage AK 99510-0360
RE: 2G -11A
DATE: 02/11/2019
C.onocoPhilli,p$
TRANSMITTAL.
TO: Abby Bell
AOGCC
222 W. Th Ave., Suite 100
Anchorage, Alaska 99501
Transmitted:
211Ga
3036
EGA i V E D
FEB 11 2019
CC: 2G -11A - e -transmittal well folder
Receipt: Date:�1,61q
Alaska/IT-GGRE I Co 011m 'os Alaska I Office; 907.265.6947; Mobile 907.440.4512
•• • z�- ti4
z(: il(LC,
Regg, James B (DOA)
From: NSK Prod Engr Specialist <n1139@conocophillips.com>
3/t Z/()
Sent: Thursday, May 12, 2016 4:30 PMT
To: Bixby, Brian D (DOA); Regg,James B (DOA)
Cc: NSK Fieldwide Operations Supt
Subject: Requested Wellhouse Sign Photos 1L-04B, 2G-11A
Attachments: Wellhouse Signs to AOGCC.pdf
Enclosed are the requested photos showing new wellhouse signs for wells that were identified during State witnessed
SVS testing in April.This should close out the Deficiency Reports for 1L-04B, 2G-11A wellhouses.
Please let us know if you need anything further.
Regards,
Darrell Humphrey j Bob Christensen
Production Engineering Specialist
Conocophillips Alaska Inc.
n1139@conocophillips.com
Office (907) 659-7535 Pager(907) 659-7000#924ti A�' `
1
• •
c
Li
..,c c ca w
N 3 0. O �'
cC O L Vii±x e
Zi Zi;
CD
NQ - ' c
am
,-----
NIL p '3 -
� Q- o � a
a� No
• U U v
�C C7 `mtc
yrs:
O = U Q o QU
mmi 1.-C �1Vit (CS CZ WI
W 0
O
CO iii (f)
•.■t Q 0 INN M Ca CD011111101O
NC ....
NMI FENN
\)11 CA cv N Imam Lia, Lrik
NJ OC 0= c:11 7 M •
(14:) Ira N b' co
N
Ca c*I ‘1:: a
Mt
eta
Zft "S
A d
0 i
Q
• Ka(
Regg, James B (DOA)
From: NSK Prod Engr Specialist <n1139@conocophillips.com> 5110lio
Sent: Saturday, May 07, 2016 4:58 PM
To: Regg, James B (DOA); Bixby, Brian D (DOA); Brooks, Phoebe L (DOA)
Cc: CPF2 DS Lead Techs NSK; NSK Fieldwide Operations Supt; CPF2 Ops Supv; CPF1&2 Ops
Supt
Subject: 2G-11A, 2S AOGCC Deficiencies Corrected
Attachments: 2G-11A -2S AOGCC deficiency response 04-22-16 .pdf; 2G-11A - 2S AOGCC sign
deficiency completed 05-07-16.pdf
Jim,
Attached you will find the complete deficiency report for the missing/incorrect wellhouse signage on KRU 2G-11A& KRU
DS2S.
Bob Christensen/Darrell Humphrey
NSK Production Engineering Specialist SEP 2 6 2016
ConocoPhillips Alaska, Inc. SCANNED
Kuparuk Office: 907.659.7535
Kuparuk Pager: 659.7000; #924
CPAI Internal Mail: NSK-69
This email may contain confidential information. If you receive this e-mail in error, please notify the sender and delete
this email immediately.
From: NSK Prod Engr Specialist
Sent: Saturday, April 23, 2016 12:41 PM
To: 'Regg,James B (DOA)' (iim.regg@alaska.gov) <iim.regg@alaska.gov>; 'Bixby, Brian D (DOA)'
<brian.bixbv@alaska.gov>
Cc: CPF2 DS Lead Techs NSK<n1126Pconocophillips.com>; CPF2 Ops Supv<n2064@conocophillips.com>; CPF1&2 Ops
Supt<n2073@conocophillips.com>; NSK Fieldwide Operations Supt<n2072@conocophillips.com>
Subject: 2G-11A, 2S AOGCC Deficiency Report response
Jim - Enclosed is ConocoPhillips response to deficiencies noted by AOGCC inspector Brian Bixby on 4/18/16.
Signs have been ordered for both 2G-11A and 2S pad.They will be installed as soon as they arrive and photos will be
taken and submitted then.
Regards,
Darrell Humphrey/Bob Christensen
ConocoPhillips Alaska, Inc.
Production Engineering Specialist
Office (907) 659-7535 NSK-69
Pager(907) 659-7000 (924)
1
•
State of Alaska
Oil and Gas Conservation Commission
Deficiency Report
Location: KRU 2G-Pad aad-i Date: 4/18/2016 •
PTD: 2-15 I l(0.0
Operator: Conoco Phillips Alaska Type Inspection: SVS
Operator Rep: Darrell Humphrey Inspector: Brian Bixby
Position: Production Engineering Specialist
4lz k
Op, Phone: 907-659-7535 Correct by(date): A
Op. Email: Follow Up Req'd: Yes
Detailed Description of Deficiencies Date Corrected
KRU 2G-11A has the wrong PTD number and the wrong well name on the wellhouse sign. 4/22/2016
Please order new sign and replace.
KRU 52-Pad-None of the welihouses have the wellsigns installed on them. Please get them 4/22/2016
installed as soon as possible.
Please take pictures of correct action and send back to AOGCC. Pending
NONE
Attachments:
Darrell Humphrey � . �,. 4/.
a 1 *erator Rep
Signatures:
Brian Bixby AOGCC Inspector
*After signing,a copy of this form is to be left with the operator.
Follow-up Instructions
Return a copy of this Deficiency Report to AOGCC(Attention: Inspection Supervisor)within 7 days of receipt. Include the"Date
Corrected"and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up
inspection was performed by AOGCC,include the date and name of Inspector. Extensions for corrective actions taking longer than
the"correct by"date must be requested and accompanied by justification(Attention:Inspection Supervisor).Documentation of
deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action,
Revised 2/2016
u���
. ���/
��
ConocoPhillips���������~���-� NNN
Alaska
rxn��=a
AOGCC EXCEPTION REPORT
Location: 2G Date: 04/18/16 AOGCC Inspector: Brian Bixby
Instructions: All exceptions listed below must be corrected within 7 days of receipt of this notification.
Documentation of the work performed is to be entered into the'Action Taken'section below.
Note - Failure to complwith these instructions may constitute a violation of SOA regulations and may
be subject to enforcement action under 20 AAC 25.535
EXCEPTIONS NOTED:
fRU 20-hA has the wrong PTD number and the wrong well name on the welihouse sign. Please order --
new sign and replace.
'newsignondrep\are.
Action Taken to Correct Problem:
The CPF 2 DSPE has contacted the Sim Ops department and an
order has been placed for the new sign. The signs are scheduled to Date: 04/22/16 Initials: BMS
arrive in about a week and will be installed as soon as they are
received.
Date: Initials:
Date: Initials:
Date: Initials:
Date: Initials:
Date: Initials:
Return completed form to Prod. Engr. Specialist
n1139Roonnuophi||ipu.00m
Distribution: CPF DSLT
CPF OPS Supv
Prod. Engr. Specialist
C.C. CPF1&2Ops Supt
CPF3 Ops & DOT Pipelines Supt
NSK Fieldwide Operations Supt
aa zG-r(A
a3i(
Regg, James B (DOA)
From: NSK Prod Engr Specialist <n1139@conocophillips.com>
Sent: Tuesday, April 19, 2016 7:05 AM ��a
To: Bixby, Brian D (DOA) f`t
Cc: Regg, James B (DOA); NSK Fieldwide Operations Supt
Subject: RE: Emailing: 160418 KRU Wellhouse signs Deficiency Report.xlsx
Brian, I have received your deficiency report noting the incorrect and lack of signs on 2G-11 and 2S Pad well houses and
have already started corrective action on it.A reply will be submitted within 7 days.
Thanks
Darrell Humphrey/ Bob Christensen
ConocoPhillips Alaska, Inc.
Production Engineering Specialist
Office (907) 659-7535 NSK-69
Pager(907) 659-7000 (924)
Original Message
From: Bixby, Brian D (DOA) [mailto:brian.bixby@alaska.gov]
Sent: Tuesday, April 19, 2016 4:34 AM
To: NSK Prod Engr Specialist<n1139@conocophillips.com>
Cc: Regg,James B (DOA) <iim.regg@alaska.gov>
Subject: [EXTERNAL]Emailing: 160418 KRU Wellhouse signs Deficiency Report.xlsx
Darrell,
I was directed to put these on a Deficiency Report. I will stop by and have you sigh a copy if time allows when I'm over
there for a job today. But please reply to ALL on this email for confirmation you received it.
Thanks,
Brian
Brian Bixby
Petroleum Inspector
Cell 509-998-3683
brian.bixby@alaska.gov
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil
and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may
contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may
violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or
forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Brian Bixby at (907) 279-1433
or brian.bixby@alaska.gov.
1