Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-116FROM: Sandra D. Lemke, ATO -704 ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage AK 99510-0360 RE: 2G -11A DATE: 02/11/2019 C.onocoPhilli,p$ TRANSMITTAL. TO: Abby Bell AOGCC 222 W. Th Ave., Suite 100 Anchorage, Alaska 99501 Transmitted: 211Ga 3036 EGA i V E D FEB 11 2019 CC: 2G -11A - e -transmittal well folder Receipt: Date:�1,61q Alaska/IT-GGRE I Co 011m 'os Alaska I Office; 907.265.6947; Mobile 907.440.4512 •• • z�- ti4 z(: il(LC, Regg, James B (DOA) From: NSK Prod Engr Specialist <n1139@conocophillips.com> 3/t Z/() Sent: Thursday, May 12, 2016 4:30 PMT To: Bixby, Brian D (DOA); Regg,James B (DOA) Cc: NSK Fieldwide Operations Supt Subject: Requested Wellhouse Sign Photos 1L-04B, 2G-11A Attachments: Wellhouse Signs to AOGCC.pdf Enclosed are the requested photos showing new wellhouse signs for wells that were identified during State witnessed SVS testing in April.This should close out the Deficiency Reports for 1L-04B, 2G-11A wellhouses. Please let us know if you need anything further. Regards, Darrell Humphrey j Bob Christensen Production Engineering Specialist Conocophillips Alaska Inc. n1139@conocophillips.com Office (907) 659-7535 Pager(907) 659-7000#924ti A�' ` 1 • • c Li ..,c c ca w N 3 0. O �' cC O L Vii±x e Zi Zi; CD NQ - ' c am ,----- NIL p '3 - � Q- o � a a� No • U U v �C C7 `mtc yrs: O = U Q o QU mmi 1.-C �1Vit (CS CZ WI W 0 O CO iii (f) •.■t Q 0 INN M Ca CD011111101O NC .... NMI FENN \)11 CA cv N Imam Lia, Lrik NJ OC 0= c:11 7 M • (14:) Ira N b' co N Ca c*I ‘1:: a Mt eta Zft "S A d 0 i Q • Ka( Regg, James B (DOA) From: NSK Prod Engr Specialist <n1139@conocophillips.com> 5110lio Sent: Saturday, May 07, 2016 4:58 PM To: Regg, James B (DOA); Bixby, Brian D (DOA); Brooks, Phoebe L (DOA) Cc: CPF2 DS Lead Techs NSK; NSK Fieldwide Operations Supt; CPF2 Ops Supv; CPF1&2 Ops Supt Subject: 2G-11A, 2S AOGCC Deficiencies Corrected Attachments: 2G-11A -2S AOGCC deficiency response 04-22-16 .pdf; 2G-11A - 2S AOGCC sign deficiency completed 05-07-16.pdf Jim, Attached you will find the complete deficiency report for the missing/incorrect wellhouse signage on KRU 2G-11A& KRU DS2S. Bob Christensen/Darrell Humphrey NSK Production Engineering Specialist SEP 2 6 2016 ConocoPhillips Alaska, Inc. SCANNED Kuparuk Office: 907.659.7535 Kuparuk Pager: 659.7000; #924 CPAI Internal Mail: NSK-69 This email may contain confidential information. If you receive this e-mail in error, please notify the sender and delete this email immediately. From: NSK Prod Engr Specialist Sent: Saturday, April 23, 2016 12:41 PM To: 'Regg,James B (DOA)' (iim.regg@alaska.gov) <iim.regg@alaska.gov>; 'Bixby, Brian D (DOA)' <brian.bixbv@alaska.gov> Cc: CPF2 DS Lead Techs NSK<n1126Pconocophillips.com>; CPF2 Ops Supv<n2064@conocophillips.com>; CPF1&2 Ops Supt<n2073@conocophillips.com>; NSK Fieldwide Operations Supt<n2072@conocophillips.com> Subject: 2G-11A, 2S AOGCC Deficiency Report response Jim - Enclosed is ConocoPhillips response to deficiencies noted by AOGCC inspector Brian Bixby on 4/18/16. Signs have been ordered for both 2G-11A and 2S pad.They will be installed as soon as they arrive and photos will be taken and submitted then. Regards, Darrell Humphrey/Bob Christensen ConocoPhillips Alaska, Inc. Production Engineering Specialist Office (907) 659-7535 NSK-69 Pager(907) 659-7000 (924) 1 • State of Alaska Oil and Gas Conservation Commission Deficiency Report Location: KRU 2G-Pad aad-i Date: 4/18/2016 • PTD: 2-15 I l(0.0 Operator: Conoco Phillips Alaska Type Inspection: SVS Operator Rep: Darrell Humphrey Inspector: Brian Bixby Position: Production Engineering Specialist 4lz k Op, Phone: 907-659-7535 Correct by(date): A Op. Email: Follow Up Req'd: Yes Detailed Description of Deficiencies Date Corrected KRU 2G-11A has the wrong PTD number and the wrong well name on the wellhouse sign. 4/22/2016 Please order new sign and replace. KRU 52-Pad-None of the welihouses have the wellsigns installed on them. Please get them 4/22/2016 installed as soon as possible. Please take pictures of correct action and send back to AOGCC. Pending NONE Attachments: Darrell Humphrey � . �,. 4/. a 1 *erator Rep Signatures: Brian Bixby AOGCC Inspector *After signing,a copy of this form is to be left with the operator. Follow-up Instructions Return a copy of this Deficiency Report to AOGCC(Attention: Inspection Supervisor)within 7 days of receipt. Include the"Date Corrected"and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up inspection was performed by AOGCC,include the date and name of Inspector. Extensions for corrective actions taking longer than the"correct by"date must be requested and accompanied by justification(Attention:Inspection Supervisor).Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action, Revised 2/2016 u��� . ���/ �� ConocoPhillips���������~���-� NNN Alaska rxn��=a AOGCC EXCEPTION REPORT Location: 2G Date: 04/18/16 AOGCC Inspector: Brian Bixby Instructions: All exceptions listed below must be corrected within 7 days of receipt of this notification. Documentation of the work performed is to be entered into the'Action Taken'section below. Note - Failure to complwith these instructions may constitute a violation of SOA regulations and may be subject to enforcement action under 20 AAC 25.535 EXCEPTIONS NOTED: fRU 20-hA has the wrong PTD number and the wrong well name on the welihouse sign. Please order -- new sign and replace. 'newsignondrep\are. Action Taken to Correct Problem: The CPF 2 DSPE has contacted the Sim Ops department and an order has been placed for the new sign. The signs are scheduled to Date: 04/22/16 Initials: BMS arrive in about a week and will be installed as soon as they are received. Date: Initials: Date: Initials: Date: Initials: Date: Initials: Date: Initials: Return completed form to Prod. Engr. Specialist n1139Roonnuophi||ipu.00m Distribution: CPF DSLT CPF OPS Supv Prod. Engr. Specialist C.C. CPF1&2Ops Supt CPF3 Ops & DOT Pipelines Supt NSK Fieldwide Operations Supt aa zG-r(A a3i( Regg, James B (DOA) From: NSK Prod Engr Specialist <n1139@conocophillips.com> Sent: Tuesday, April 19, 2016 7:05 AM ��a To: Bixby, Brian D (DOA) f`t Cc: Regg, James B (DOA); NSK Fieldwide Operations Supt Subject: RE: Emailing: 160418 KRU Wellhouse signs Deficiency Report.xlsx Brian, I have received your deficiency report noting the incorrect and lack of signs on 2G-11 and 2S Pad well houses and have already started corrective action on it.A reply will be submitted within 7 days. Thanks Darrell Humphrey/ Bob Christensen ConocoPhillips Alaska, Inc. Production Engineering Specialist Office (907) 659-7535 NSK-69 Pager(907) 659-7000 (924) Original Message From: Bixby, Brian D (DOA) [mailto:brian.bixby@alaska.gov] Sent: Tuesday, April 19, 2016 4:34 AM To: NSK Prod Engr Specialist<n1139@conocophillips.com> Cc: Regg,James B (DOA) <iim.regg@alaska.gov> Subject: [EXTERNAL]Emailing: 160418 KRU Wellhouse signs Deficiency Report.xlsx Darrell, I was directed to put these on a Deficiency Report. I will stop by and have you sigh a copy if time allows when I'm over there for a job today. But please reply to ALL on this email for confirmation you received it. Thanks, Brian Brian Bixby Petroleum Inspector Cell 509-998-3683 brian.bixby@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Brian Bixby at (907) 279-1433 or brian.bixby@alaska.gov. 1